=== page 1 === UNCLASSIFIED Department of War Fiscal Year (FY) 2027 Budget Estimates April 2026 Navy Justification Book Volume 1 of 5 Other Procurement, Navy Budget Activity 01 UNCLASSIFIED === page 2 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED === page 3 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Table of Volumes Budget Activity 01............................................................................................................................................................. Volume 1 Budget Activity 02............................................................................................................................................................. Volume 2 Budget Activity 03............................................................................................................................................................. Volume 3 Budget Activity 04............................................................................................................................................................. Volume 4 Budget Activities 05-08.....................................................................................................................................................Volume 5 UNCLASSIFIED Volume 1 - i === page 4 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - ii === page 5 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Volume 1 Table of Contents Cost of Report............................................................................................................................................................. Volume 1 - v Introduction and Explanation of Contents..............................................................................................................Volume 1 - vii Comptroller Exhibit P-1..............................................................................................................................................Volume 1 - ix Master Line Item Table of Contents (by Appropriation then Line Number)...........................................................Volume 1 - li Master Line Item Table of Contents (Alphabetically by Line Item Title).............................................................. Volume 1 - lxi Line Item Table of Contents (by Appropriation then Line Number)................................................................... Volume 1 - lxix Line Item Table of Contents (Alphabetically by Line Item Title)....................................................................... Volume 1 - lxxiii Executive Summary................................................................................................................................................Volume 1 - lxxv Exhibit P-40s................................................................................................................................................................ Volume 1 - 1 UNCLASSIFIED Volume 1 - iii === page 6 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - iv === page 7 === OPN 1 OPN 2 OPN 3 OPN 4 OPN 5-8 The estimated cost of this report for the Department of the Navy (DON) is $58,268. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. $58,268 The estimated cost of this report for the Department of the Navy (DON) is $100,759. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. $100,759 The estimated cost of this report for the Department of the Navy (DON) is $23,118. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. $23,118 The estimated cost of this report for the Department of the Navy (DON) is $38,526. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. $38,526 The estimated cost of this report for the Department of the Navy (DON) is $29,304. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. $29,304 Volume 1 - v === page 8 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - vi === page 9 === Department of Defense Appropriations Act, 2027 Other Procurement, Navy For procurement, production, and modernization of support equipment and materials not otherwise provided for, Navy ordnance (except ordnance for new aircraft, new ships, and ships authorized for conversion); the purchase of passenger motor vehicles for replacement only; expansion of public and private plants, including the land necessary therefore, and such lands and interests therein, may be acquired, and construction prosecuted thereon prior to approval of title; and procurement and installation of equipment, appliances, and machine tools in public and private plants; reserve plant and Government and contractor-owned equipment layaway, $18,866,679 to remain available for obligation until September 30, 2029, of which $0 shall be available for the Navy Reserve and the Marine Corps Reserve: Provided, That such funds are also available for the maintenance, repair, and modernization of ships. Volume 1 - vii === page 10 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - viii === page 11 === UNCLASSIFIED Department of War FY 2027 President's Budget Exhibit P-1 Total Obligational Authority DoW Component Summary (Dollars in Thousands) FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total Appropriation Summary FY 2025 Actuals Other Procurement, Navy 15,817,464 14,693,978 5,802,107 20,496,085 Total Department of the Navy 15,817,464 14,693,978 5,802,107 20,496,085 Grand Total Department of War 15,817,464 14,693,978 5,802,107 20,496,085 UNCLASSIFIED Volume 1 - ix === page 12 === UNCLASSIFIED Department of War FY 2027 President's Budget Exhibit P-1 Total Obligational Authority DoW Component Summary (Dollars in Thousands) Appropriation Summary Other Procurement, Navy FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total 18,866,679 50,000 18,916,679 Total Department of the Navy 18,866,679 50,000 18,916,679 Grand Total Department of War 18,866,679 50,000 18,916,679 UNCLASSIFIED Volume 1 - x === page 13 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority Navy Summary (Dollars in Thousands) FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total Appropriation Summary FY 2025 Actuals Other Procurement, Navy 15,817,464 14,693,978 5,802,107 20,496,085 15,817,464 14,693,978 5,802,107 20,496,085 Total Department of the Navy UNCLASSIFIED Volume 1 - xi === page 14 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority Navy Summary (Dollars in Thousands) Appropriation Summary Other Procurement, Navy Total Department of the Navy FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total 18,866,679 50,000 18,916,679 18,866,679 50,000 18,916,679 UNCLASSIFIED Volume 1 - xii === page 15 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Budget Activity Summary (Dollars in Thousands) Appropriation: Other Procurement, Navy FY 2025 Actuals FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total Budget Activity 01. Ships support equipment 6,488,639 5,839,954 3,510,954 9,350,908 02. Communications and electronics equipment 4,075,820 4,467,421 143,000 4,610,421 03. Aviation support equipment 883,449 843,043 80,000 923,043 04. Ordnance support equipment 1,432,684 1,660,570 17,380 1,677,950 260,583 350,308 200 350,508 1,049,044 672,821 40,800 713,621 05. Civil engineering support equipment 06. Supply support equipment 07. Personnel and command support equipment 619,602 700,723 21,946 722,669 1,007,643 159,138 1,987,827 2,146,965 15,817,464 14,693,978 5,802,107 20,496,085 08. Spares and repair parts Total Other Procurement, Navy UNCLASSIFIED Volume 1 - xiii === page 16 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Budget Activity Summary (Dollars in Thousands) Appropriation: Other Procurement, Navy FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total Budget Activity 01. Ships support equipment 7,696,789 02. Communications and electronics equipment 50,000 7,746,789 5,446,166 5,446,166 03. Aviation support equipment 899,479 899,479 04. Ordnance support equipment 2,210,273 2,210,273 05. Civil engineering support equipment 353,489 353,489 06. Supply support equipment 396,204 396,204 1,098,568 1,098,568 765,711 765,711 07. Personnel and command support equipment 08. Spares and repair parts Total Other Procurement, Navy 18,866,679 UNCLASSIFIED 50,000 18,916,679 Volume 1 - xiv === page 17 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost Budget Activity 01: Ships support equipment Ship Propulsion Equipment 1 Surface Power Equipment A U 20,840 9,978 9,978 A U 77,592 62,004 62,004 A U 97,206 96,945 96,945 Generators 2 Surface Combatant HM&E Navigation Equipment 3 Other Navigation Equipment Other Shipboard Equipment 4 Sub Periscope, Imaging and Supt Equip Prog A U 275,575 204,863 204,863 5 DDG Mod A U 822,065 878,787 878,787 6 Firefighting Equipment A U 38,521 36,488 36,488 UNCLASSIFIED Volume 1 - xv === page 18 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Budget Activity 01: Ships support equipment Ship Propulsion Equipment 1 Surface Power Equipment A U 22,668 22,668 A U 103,871 103,871 A U 83,510 83,510 Generators 2 Surface Combatant HM&E Navigation Equipment 3 Other Navigation Equipment Other Shipboard Equipment 4 Sub Periscope, Imaging and Supt Equip Prog A U 344,885 344,885 5 DDG Mod A U 1,000,278 1,000,278 6 Firefighting Equipment A U 177,708 177,708 UNCLASSIFIED Volume 1 - xvi === page 19 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 7 Command and Control Switchboard A U 2,402 2,417 8 LHA/LHD Midlife A U 76,601 60,617 9 LCC 19/20 Extended Service Life Program A U 7,352 19,276 19,276 10 Pollution Control Equipment B U 23,440 22,477 22,477 11 Submarine Support Equipment A U 278,766 383,062 383,062 12 Virginia Class Support Equipment A U 43,565 52,039 52,039 13 LCS Class Support Equipment U 5,855 2,551 2,551 14 Submarine Batteries U 30,470 28,169 28,169 15 LPD Class Support Equipment U 45,738 96,542 16 DDG 1000 Class Support Equipment A U 325,668 115,267 115,267 17 Strategic Platform Support Equip A U 53,931 38,039 38,039 UNCLASSIFIED 2,417 65,400 29,000 126,017 125,542 Volume 1 - xvii === page 20 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 7 Command and Control Switchboard A U 2,259 2,259 8 LHA/LHD Midlife A U 131,315 131,315 9 LCC 19/20 Extended Service Life Program A U 766 766 10 Pollution Control Equipment B U 22,506 22,506 11 Submarine Support Equipment A U 330,951 330,951 12 Virginia Class Support Equipment A U 83,297 83,297 13 LCS Class Support Equipment U 15,815 15,815 14 Submarine Batteries U 26,211 26,211 15 LPD Class Support Equipment U 213,723 213,723 16 DDG 1000 Class Support Equipment A U 58,284 58,284 17 Strategic Platform Support Equip A U 72,163 72,163 UNCLASSIFIED Volume 1 - xviii === page 21 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 18 DSSP Equipment 19 Small Unmanned Surface Vehicles 20 LCAC 21 Underwater EOD Equipment 22 Items Less Than $5 Million 23 Chemical Warfare Detectors A FY 2025 Actuals Sec U Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty 4,586 Cost Qty Qty 5,849 U A Cost FY 2026 Total Cost 5,849 694,020 694,020 20,321 20,321 U 11,013 U 16,650 22,355 A U 66,346 12,691 A U 3,254 2,607 2,607 22,355 7,400 20,091 Reactor Plant Equipment 24 Ship Maintenance, Repair and Modernization A U 2,573,098 2,392,620 2,392,620 25 Reactor Components A U 445,974 474,806 474,806 A U 14,000 7,842 7,842 Ocean Engineering 26 Diving and Salvage Equipment UNCLASSIFIED Volume 1 - xix === page 22 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 18 DSSP Equipment 19 Small Unmanned Surface Vehicles 20 LCAC 21 Underwater EOD Equipment 22 Items Less Than $5 Million 23 Chemical Warfare Detectors A FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost U 7,440 7,440 U 585 585 U 22,515 22,515 U 20,575 20,575 A U 69,425 69,425 A U 2,425 2,425 A Reactor Plant Equipment 24 Ship Maintenance, Repair and Modernization A U 2,737,140 2,737,140 25 Reactor Components A U 519,821 519,821 A U 33,013 33,013 Ocean Engineering 26 Diving and Salvage Equipment UNCLASSIFIED Volume 1 - xx === page 23 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost Small Boats 27 Medium Unmanned Surface Vehicle (MUSVs) A U 28 Standard Boats A U 447,298 A U 1,950,714 1,950,714 82,086 5,100 87,186 209,304 394,998 390,600 785,598 Production Facilities Equipment 29 Operating Forces Ipe Other Ship Support 30 LCS Common Mission Modules Equipment U 56,103 38,880 38,880 31 LCS MCM Mission Modules U 118,247 91,372 91,372 32 LCS SUW Mission Modules U 11,101 3,790 3,790 33 LCS In-Service Modernization A U 188,254 189,458 189,458 34 Small & Medium UUV A U 48,780 7,000 UNCLASSIFIED 345,086 352,086 Volume 1 - xxi === page 24 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Small Boats 27 Medium Unmanned Surface Vehicle (MUSVs) A U 121,130 28 Standard Boats A U 97,746 97,746 A U 492,100 492,100 50,000 171,130 Production Facilities Equipment 29 Operating Forces Ipe Other Ship Support 30 LCS Common Mission Modules Equipment U 30,565 30,565 31 LCS MCM Mission Modules U 65,113 65,113 32 LCS SUW Mission Modules U 1,719 1,719 33 LCS In-Service Modernization A U 315,272 315,272 34 Small & Medium UUV A U 110,955 110,955 UNCLASSIFIED Volume 1 - xxii === page 25 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec 35 Large UUV A U 36 Extra Large UUV A U Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty 3,313 Cost 3,313 Logistic Support 37 LSD Midlife & Modernization U Total Ships support equipment 49,044 4,079 6,488,639 5,839,954 4,079 3,510,954 9,350,908 Budget Activity 02: Communications and electronics equipment Ship Sonars 38 SPQ-9B Radar A U 7,402 39 AN/SQQ-89 Surf ASW Combat System A U 134,635 144,425 144,425 40 SSN Acoustic Equipment A U 458,824 498,597 498,597 41 Undersea Warfare Support Equipment A U 14,247 UNCLASSIFIED Volume 1 - xxiii === page 26 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 35 Large UUV A U 222,998 222,998 36 Extra Large UUV A U 135,802 135,802 U 240 240 Logistic Support 37 LSD Midlife & Modernization Total Ships support equipment 7,696,789 50,000 7,746,789 Budget Activity 02: Communications and electronics equipment Ship Sonars 38 SPQ-9B Radar A U 39 AN/SQQ-89 Surf ASW Combat System A U 142,355 142,355 40 SSN Acoustic Equipment A U 454,161 454,161 41 Undersea Warfare Support Equipment A U UNCLASSIFIED Volume 1 - xxiv === page 27 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost ASW Electronic Equipment 42 Submarine Acoustic Warfare System A U 51,514 56,482 56,482 43 SSTD A U 9,647 14,915 14,915 44 Fixed Surveillance System A U 405,854 352,312 45 SURTASS A U 45,975 31,169 31,169 A U 190,011 422,704 422,704 A U 361,915 379,908 379,908 U 4,680 13,008 13,008 143,000 495,312 Electronic Warfare Equipment 46 AN/SLQ-32 Reconnaissance Equipment 47 Shipboard IW Exploit 48 Maritime Battlespace Awareness Other Ship Electronic Equipment UNCLASSIFIED Volume 1 - xxv === page 28 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost ASW Electronic Equipment 42 Submarine Acoustic Warfare System A U 68,881 68,881 43 SSTD A U 14,857 14,857 44 Fixed Surveillance System A U 490,548 490,548 45 SURTASS A U 72,190 72,190 A U 653,483 653,483 A U 701,667 701,667 U 8,652 8,652 Electronic Warfare Equipment 46 AN/SLQ-32 Reconnaissance Equipment 47 Shipboard IW Exploit 48 Maritime Battlespace Awareness Other Ship Electronic Equipment UNCLASSIFIED Volume 1 - xxvi === page 29 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 49 Cooperative Engagement Capability B U 26,644 26,648 26,648 50 Naval Tactical Command Support System (NTCSS) A U 13,614 7,972 7,972 51 ATDLS A U 68,458 58,739 58,739 52 Navy Command and Control System (NCCS) U 3,645 3,489 3,489 53 Minesweeping System Replacement A U 16,808 16,426 16,426 54 Navstar GPS Receivers (SPACE) A U 37,964 45,701 45,701 55 American Forces Radio and TV Service A U 3,802 304 304 Aviation Electronic Equipment 56 Ashore ATC Equipment A U 90,586 97,262 97,262 57 Afloat ATC Equipment A U 74,458 72,104 72,104 58 ID Systems A U 59,602 52,171 52,171 UNCLASSIFIED Volume 1 - xxvii === page 30 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 49 Cooperative Engagement Capability B U 33,932 33,932 50 Naval Tactical Command Support System (NTCSS) A U 10,108 10,108 51 ATDLS A U 52,758 52,758 52 Navy Command and Control System (NCCS) U 16,167 16,167 53 Minesweeping System Replacement A U 14,879 14,879 54 Navstar GPS Receivers (SPACE) A U 43,097 43,097 55 American Forces Radio and TV Service A U 289 289 Aviation Electronic Equipment 56 Ashore ATC Equipment A U 83,057 83,057 57 Afloat ATC Equipment A U 62,581 62,581 58 ID Systems A U 35,620 35,620 UNCLASSIFIED Volume 1 - xxviii === page 31 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 59 Joint Precision Approach And Landing System ( 60 Naval Mission Planning Systems A FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost U 7,287 5,105 5,105 U 42,326 60,058 60,058 U 8,479 Other Shore Electronic Equipment 61 Maritime Integrated Broadcast System 62 Tactical/Mobile C4I Systems A U 66,470 64,901 64,901 63 Intelligence Surveillance and Reconnaissance (ISR) A U 16,946 12,112 12,112 64 CANES U 439,977 534,324 534,324 65 RADIAC U 38,688 31,289 31,289 66 CANES-Intell U 50,654 46,281 46,281 67 GPETE U 32,005 33,395 33,395 68 MASF U 24,361 13,205 13,205 A A UNCLASSIFIED Volume 1 - xxix === page 32 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 59 Joint Precision Approach And Landing System ( 60 Naval Mission Planning Systems A FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost U 2,976 2,976 U 54,487 54,487 Other Shore Electronic Equipment 61 Maritime Integrated Broadcast System 62 Tactical/Mobile C4I Systems A U 48,262 48,262 63 Intelligence Surveillance and Reconnaissance (ISR) A U 11,824 11,824 64 CANES U 493,046 493,046 65 RADIAC U 38,000 38,000 66 CANES-Intell U 43,028 43,028 67 GPETE U 31,462 31,462 68 MASF U 5,822 5,822 U A A UNCLASSIFIED Volume 1 - xxx === page 33 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 69 Integ Combat System Test Facility A U 6,709 11,493 11,493 70 EMI Control Instrumentation A U 4,081 3,687 3,687 71 In-Service Radars and Sensors A U 262,890 249,656 249,656 Shipboard Communications 72 Battle Force Tactical Network A U 104,019 106,583 106,583 73 Shipboard Tactical Communications A U 24,602 20,900 20,900 74 Ship Communications Automation A U 127,321 162,075 162,075 75 Communications Items Under $5M A U 9,209 11,138 11,138 Submarine Communications 76 Submarine Broadcast Support A U 129,467 113,115 113,115 77 Submarine Communication Equipment A U 68,334 84,584 84,584 UNCLASSIFIED Volume 1 - xxxi === page 34 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 69 Integ Combat System Test Facility A U 6,454 6,454 70 EMI Control Instrumentation A U 3,435 3,435 71 In-Service Radars and Sensors A U 338,946 338,946 Shipboard Communications 72 Battle Force Tactical Network A U 125,661 125,661 73 Shipboard Tactical Communications A U 50,350 50,350 74 Ship Communications Automation A U 156,605 156,605 75 Communications Items Under $5M A U 15,097 15,097 Submarine Communications 76 Submarine Broadcast Support A U 173,069 173,069 77 Submarine Communication Equipment A U 88,071 88,071 UNCLASSIFIED Volume 1 - xxxii === page 35 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost Satellite Communications 78 Satellite Communications Systems 79 Navy Multiband Terminal (NMT) 80 Mobile Advanced EHF Terminal (MAT) A U 59,732 62,943 62,943 U 162,928 63,433 63,433 220,453 220,453 A U A U 4,551 3,389 3,389 Shore Communications 81 Joint Communications Support Element (JCSE) Cryptographic Equipment 82 Info Systems Security Program (ISSP) A U 195,063 191,239 191,239 83 MIO Intel Exploitation Team A U 1,100 1,122 1,122 Cryptologic Equipment UNCLASSIFIED Volume 1 - xxxiii === page 36 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Satellite Communications 78 Satellite Communications Systems 79 Navy Multiband Terminal (NMT) 80 Mobile Advanced EHF Terminal (MAT) A U 57,961 57,961 U 57,768 57,768 A U 202,305 202,305 A U Shore Communications 81 Joint Communications Support Element (JCSE) Cryptographic Equipment 82 Info Systems Security Program (ISSP) A U 349,099 349,099 83 MIO Intel Exploitation Team A U 1,063 1,063 Cryptologic Equipment UNCLASSIFIED Volume 1 - xxxiv === page 37 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 84 Cryptologic Communications Equip FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals Sec Qty Cost Qty A U 15,506 Cost Qty Cost FY 2026 Total Qty Cost 7,841 7,841 58,764 58,764 Other Electronic Support 85 DON TRR-1 (Afloat) A U 10,370 86 DON UAS Video 5 (Afloat) A U 5,370 87 USN Ashore/Shipboard CONOPS Verification and A U 6,586 88 USN Training Ranges - Codify CONOPS/TTPs A U 1,375 89 USN Training Ranges - Spectrum Sensing A U 1,000 90 USN EME Sensing and Monitoring A U 120 91 Coast Guard Equipment A U 49,523 A U 18,486 Drug Interdiction Support 92 Other Drug Interdiction Support UNCLASSIFIED Volume 1 - xxxv === page 38 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 84 Cryptologic Communications Equip FY 2027 Discretionary Request Sec A U Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 7,419 7,419 Other Electronic Support 85 DON TRR-1 (Afloat) A U 86 DON UAS Video 5 (Afloat) A U 87 USN Ashore/Shipboard CONOPS Verification and A U 88 USN Training Ranges - Codify CONOPS/TTPs A U 89 USN Training Ranges - Spectrum Sensing A U 90 USN EME Sensing and Monitoring A U 91 Coast Guard Equipment A U 67,106 67,106 A U 57,568 57,568 Drug Interdiction Support 92 Other Drug Interdiction Support UNCLASSIFIED Volume 1 - xxxvi === page 39 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Total Communications and electronics equipment Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 4,075,820 4,467,421 143,000 4,610,421 80,000 369,908 Budget Activity 03: Aviation support equipment Sonobuoys 93 Sonobuoys - All Types A U 353,441 289,908 Aircraft Support Equipment 94 Minotaur A U 5,431 5,191 5,191 95 Weapons Range Support Equipment A U 138,062 123,435 123,435 96 Aircraft Support Equipment A U 121,727 82,039 82,039 97 Advanced Arresting Gear (AAG) A U 2,244 4,484 4,484 98 Electromagnetic Aircraft Launch System (EMALS A U 14,702 16,294 16,294 99 Meteorological Equipment A U 17,982 13,806 13,806 UNCLASSIFIED Volume 1 - xxxvii === page 40 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Total Communications and electronics equipment Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 5,446,166 5,446,166 Budget Activity 03: Aviation support equipment Sonobuoys 93 Sonobuoys - All Types A U 300,151 300,151 Aircraft Support Equipment 94 Minotaur A U 4,831 4,831 95 Weapons Range Support Equipment A U 119,900 119,900 96 Aircraft Support Equipment A U 69,065 69,065 97 Advanced Arresting Gear (AAG) A U 23,551 23,551 98 Electromagnetic Aircraft Launch System (EMALS A U 36,908 36,908 99 Meteorological Equipment A U 7,477 7,477 UNCLASSIFIED Volume 1 - xxxviii === page 41 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals Sec Qty Cost Qty Cost Qty Cost FY 2026 Total Qty Cost 100 Airborne MCM A U 10,643 9,643 9,643 101 Aviation Support Equipment A U 99,656 111,334 111,334 102 UMCS-Unman Carrier Aviation(UCA)Mission Cntrl A U 119,561 186,909 186,909 883,449 843,043 Total Aviation support equipment 80,000 923,043 Budget Activity 04: Ordnance support equipment Ship Gun System Equipment 103 Ship Gun Systems Equipment A U 6,712 7,358 7,358 Ship Missile Systems Equipment 104 Harpoon Support Equipment A U 226 209 209 105 Ship Missile Support Equipment A U 431,830 527,292 527,292 106 Tomahawk Support Equipment A U 98,921 107,709 107,709 FBM Support Equipment UNCLASSIFIED Volume 1 - xxxix === page 42 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 100 Airborne MCM A U 9,507 9,507 101 Aviation Support Equipment A U 116,873 116,873 102 UMCS-Unman Carrier Aviation(UCA)Mission Cntrl A U 211,216 211,216 899,479 899,479 Total Aviation support equipment Budget Activity 04: Ordnance support equipment Ship Gun System Equipment 103 Ship Gun Systems Equipment A U 6,962 6,962 Ship Missile Systems Equipment 104 Harpoon Support Equipment A U 195 195 105 Ship Missile Support Equipment A U 431,069 431,069 106 Tomahawk Support Equipment A U 116,208 116,208 FBM Support Equipment UNCLASSIFIED Volume 1 - xl === page 43 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty 107 CPS Support Equipment A U 108 Strategic Missile Systems Equip A U 320,691 491,179 Cost FY 2026 Total Qty 67,264 Cost 67,264 9,180 500,359 ASW Support Equipment 109 SSN Combat Control Systems A U 153,237 102,954 102,954 110 ASW Support Equipment A U 25,362 25,721 25,721 Other Ordnance Support Equipment 111 Explosive Ordnance Disposal Equip B U 52,885 17,758 17,758 112 Directed Energy Systems A U 3,817 2,976 2,976 113 Items Less Than $5 Million A U 3,193 3,635 3,635 A U 75,614 50,741 50,741 Other Expendable Ordnance 114 Anti-Ship Missile Decoy System UNCLASSIFIED Volume 1 - xli === page 44 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 107 CPS Support Equipment A U 188,430 188,430 108 Strategic Missile Systems Equip A U 327,941 327,941 ASW Support Equipment 109 SSN Combat Control Systems A U 165,416 165,416 110 ASW Support Equipment A U 25,105 25,105 48,252 48,252 Other Ordnance Support Equipment 111 Explosive Ordnance Disposal Equip B U 112 Directed Energy Systems A U 113 Items Less Than $5 Million A U 2,592 2,592 A U 606,241 606,241 Other Expendable Ordnance 114 Anti-Ship Missile Decoy System UNCLASSIFIED Volume 1 - xlii === page 45 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec 115 Submarine Training Device Mods A U 116 Surface Training Equipment A U Qty Total Ordnance support equipment Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty 80,236 Cost Qty Cost FY 2026 Total Qty 77,889 Cost 77,889 179,960 177,885 8,200 186,085 1,432,684 1,660,570 17,380 1,677,950 Budget Activity 05: Civil engineering support equipment Civil Engineering Support Equipment 117 Passenger Carrying Vehicles A U 3,751 3,825 3,825 118 General Purpose Trucks A U 5,795 5,489 5,489 119 Trailers A U 120 Construction & Maintenance Equip A U 76,983 105,592 105,592 121 Fire Fighting Equipment A U 23,006 27,675 27,675 122 Tactical Vehicles B U 36,355 37,262 37,262 123 Amphibious Equipment A U 6,454 38,073 38,073 200 UNCLASSIFIED 200 Volume 1 - xliii === page 46 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec 115 Submarine Training Device Mods A U 116 Surface Training Equipment A U Qty Total Ordnance support equipment Cost FY 2027 Mandatory Request Qty 73,681 Cost FY 2027 Total Qty Cost 73,681 218,181 218,181 2,210,273 2,210,273 Budget Activity 05: Civil engineering support equipment Civil Engineering Support Equipment 117 Passenger Carrying Vehicles A U 3,567 3,567 118 General Purpose Trucks A U 4,801 4,801 119 Trailers A U 120 Construction & Maintenance Equip A U 91,269 91,269 121 Fire Fighting Equipment A U 17,107 17,107 122 Tactical Vehicles B U 46,796 46,796 123 Amphibious Equipment A U 53,916 53,916 UNCLASSIFIED Volume 1 - xliv === page 47 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 124 Pollution Control Equipment A U 3,924 4,009 4,009 125 Items less than $5 Million A U 103,014 127,086 127,086 126 Physical Security Vehicles A U 1,301 1,297 1,297 260,583 350,308 Total Civil engineering support equipment 200 350,508 40,800 40,800 Budget Activity 06: Supply support equipment Supply Support Equipment 127 Supply Equipment A U 56,585 128 First Destination Transportation A U 6,463 6,203 129 Special Purpose Supply Systems A U Total Supply support equipment 985,996 666,618 1,049,044 672,821 5,341 3,480 6,203 666,618 40,800 713,621 Budget Activity 07: Personnel and command support equipment Training Devices 130 Training Support Equipment A U UNCLASSIFIED 3,480 Volume 1 - xlv === page 48 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 124 Pollution Control Equipment A U 3,586 3,586 125 Items less than $5 Million A U 131,449 131,449 126 Physical Security Vehicles A U 998 998 353,489 353,489 Total Civil engineering support equipment Budget Activity 06: Supply support equipment Supply Support Equipment 127 Supply Equipment A U 67,828 67,828 128 First Destination Transportation A U 4,732 4,732 129 Special Purpose Supply Systems A U 323,644 323,644 396,204 396,204 10,608 10,608 Total Supply support equipment Budget Activity 07: Personnel and command support equipment Training Devices 130 Training Support Equipment A U UNCLASSIFIED Volume 1 - xlvi === page 49 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 131 Training and Education Equipment FY 2025 Actuals Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost A U 43,126 73,631 73,631 Command Support Equipment 132 Command Support Equipment A U 29,698 34,249 34,249 133 Medical Support Equipment A U 10,122 24,256 24,256 135 Naval MIP Support Equipment A U 6,590 8,810 136 Operating Forces Support Equipment A U 17,941 16,567 16,567 137 C4ISR Equipment A U 33,606 36,945 36,945 138 Environmental Support Equipment A U 47,499 42,860 42,860 139 Physical Security Equipment A U 138,799 166,577 166,577 140 Enterprise Information Technology A U 42,026 42,363 42,363 UNCLASSIFIED 21,946 30,756 Volume 1 - xlvii === page 50 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code 131 Training and Education Equipment FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost A U 331,016 331,016 Command Support Equipment 132 Command Support Equipment A U 55,202 55,202 133 Medical Support Equipment A U 54,862 54,862 135 Naval MIP Support Equipment A U 5,213 5,213 136 Operating Forces Support Equipment A U 15,107 15,107 137 C4ISR Equipment A U 33,975 33,975 138 Environmental Support Equipment A U 60,467 60,467 139 Physical Security Equipment A U 218,037 218,037 140 Enterprise Information Technology A U 40,490 40,490 UNCLASSIFIED Volume 1 - xlviii === page 51 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals Sec Qty Cost Qty Cost Qty Cost FY 2026 Total Qty Cost Other 141 Cancelled Account Adjustments A U 46 142 Next Generation Enterprise Service A U 226,479 185,755 185,755 143 Cyberspace Activities A U 2,195 2,239 2,239 Classified Programs 999 Classified Programs U 16,134 62,991 619,602 700,723 21,946 722,669 1,007,643 159,138 1,987,827 2,146,965 Total Spares and repair parts 1,007,643 159,138 1,987,827 2,146,965 Total Other Procurement, Navy 15,817,464 14,693,978 5,802,107 20,496,085 Total Personnel and command support equipment 62,991 Budget Activity 08: Spares and repair parts Spares and Repair Parts 144 Spares and Repair Parts A U UNCLASSIFIED Volume 1 - xlix === page 52 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1810N Detail (Dollars in Thousands) Appropriation: 1810 Other Procurement, Navy Line Ident No Item Nomenclature Code FY 2027 Discretionary Request Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Other 141 Cancelled Account Adjustments A U 142 Next Generation Enterprise Service A U 223,647 223,647 143 Cyberspace Activities A U 7,131 7,131 Classified Programs 999 Classified Programs U 42,813 42,813 1,098,568 1,098,568 765,711 765,711 Total Spares and repair parts 765,711 765,711 Total Other Procurement, Navy 18,866,679 Total Personnel and command support equipment Budget Activity 08: Spares and repair parts Spares and Repair Parts 144 Spares and Repair Parts A U UNCLASSIFIED 50,000 18,916,679 Volume 1 - l === page 53 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Master Line Item Table of Contents (by Appropriation then Line Number) Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 1 01 01 0131 Surface Power Equipment..................................................................................................................... Volume 1 - 1 2 01 02 0200 Surface Combatant HM&E...................................................................................................................Volume 1 - 17 3 01 06 0670 Other Navigation Equipment................................................................................................................Volume 1 - 25 4 01 09 0840 Sub Periscope, Imaging and Supt Equip Prog.................................................................................... Volume 1 - 89 5 01 09 0900 DDG Mod........................................................................................................................................... Volume 1 - 129 6 01 09 0910 Firefighting Equipment....................................................................................................................... Volume 1 - 201 7 01 09 0925 Command and Control Switchboard.................................................................................................. Volume 1 - 219 8 01 09 0933 LHA/LHD Midlife.................................................................................................................................Volume 1 - 225 9 01 09 0934 LCC 19/20 Extended Service Life Program.......................................................................................Volume 1 - 279 10 01 09 0935 Pollution Control Equipment.............................................................................................................. Volume 1 - 287 11 01 09 0941 Submarine Support Equipment..........................................................................................................Volume 1 - 309 12 01 09 0942 Virginia Class Support Equipment..................................................................................................... Volume 1 - 327 13 01 09 0944 LCS Class Support Equipment.......................................................................................................... Volume 1 - 335 14 01 09 0945 Submarine Batteries...........................................................................................................................Volume 1 - 341 15 01 09 0946 LPD Class Support Equipment.......................................................................................................... Volume 1 - 349 16 01 09 0947 DDG 1000 Class Support Equipment................................................................................................Volume 1 - 387 UNCLASSIFIED Volume 1 - li === page 54 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 17 01 09 0950 Strategic Platform Support Equip...................................................................................................... Volume 1 - 407 18 01 09 0955 Deep Subm Sys Proj (DSSP) Equip..................................................................................................Volume 1 - 415 19 01 09 0956 Small Unmanned Surface Vehicles................................................................................................... Volume 1 - 419 20 01 09 0970 LCAC..................................................................................................................................................Volume 1 - 423 21 01 09 0977 Underwater EOD Equipment............................................................................................................. Volume 1 - 427 22 01 09 0981 Items less than $5 Million.................................................................................................................. Volume 1 - 445 23 01 09 0989 Chemical Warfare Detectors..............................................................................................................Volume 1 - 459 24 01 10 1000 Ship Maintenance, Repair and Modernization................................................................................... Volume 1 - 471 25 01 10 1020 Reactor Components......................................................................................................................... Volume 1 - 491 26 01 11 1130 Diving and Salvage Equipment..........................................................................................................Volume 1 - 495 27 01 12 0954 Medium Unmanned Surface Vehicle (MUSVs)..................................................................................Volume 1 - 519 28 01 12 1210 Standard Boats.................................................................................................................................. Volume 1 - 527 29 01 14 1445 Operating Forces IPE........................................................................................................................ Volume 1 - 545 30 01 15 1600 LCS Common Mission Modules Equipment...................................................................................... Volume 1 - 563 31 01 15 1601 LCS MCM Mission Modules.............................................................................................................. Volume 1 - 577 32 01 15 1603 LCS SUW Mission Modules...............................................................................................................Volume 1 - 591 33 01 15 1604 LCS In-Service Modernization........................................................................................................... Volume 1 - 597 34 01 15 1611 Small & Medium UUV........................................................................................................................Volume 1 - 625 UNCLASSIFIED Volume 1 - lii === page 55 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 35 01 15 1612 Large UUV......................................................................................................................................... Volume 1 - 641 36 01 15 1613 Extra Large UUV................................................................................................................................Volume 1 - 647 37 01 16 1610 LSD Midlife & Modernization............................................................................................................. Volume 1 - 653 Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 38 02 02 2026 SPQ-9B Radar....................................................................................................................................... Volume 2 - 1 39 02 02 2136 AN/SQQ-89 Surf ASW Cmbt Sys.......................................................................................................... Volume 2 - 9 40 02 02 2150 SSN Acoustic Equipment.....................................................................................................................Volume 2 - 47 41 02 02 2176 Undersea Warfare Support Equipment................................................................................................Volume 2 - 89 42 02 03 2210 Submarine Acoustic Warfare System.................................................................................................. Volume 2 - 97 43 02 03 2213 Surface Ship Torpedo Def (SSTD).................................................................................................... Volume 2 - 129 44 02 03 2225 Fixed Surveillance System.................................................................................................................Volume 2 - 139 45 02 03 2237 SURTASS.......................................................................................................................................... Volume 2 - 143 46 02 04 2312 AN/SLQ-32......................................................................................................................................... Volume 2 - 167 47 02 05 2360 Shipboard IW Exploit......................................................................................................................... Volume 2 - 217 UNCLASSIFIED Volume 1 - liii === page 56 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 48 02 05 2361 Maritime Battlespace Awareness.......................................................................................................Volume 2 - 267 49 02 07 2606 Cooperative Engagement Capability..................................................................................................Volume 2 - 273 50 02 07 2611 Naval Tact Cmd Supt Sys (NTCSS)..................................................................................................Volume 2 - 291 51 02 07 2614 Adv Tact Data Link Sys (ATDLS)...................................................................................................... Volume 2 - 315 52 02 07 2618 Navy Command and Control System (NCCS)...................................................................................Volume 2 - 331 53 02 07 2622 Minesweeping System Replacement................................................................................................. Volume 2 - 339 54 02 07 2657 NAVSTAR GPS Receivers (Space)...................................................................................................Volume 2 - 343 55 02 07 2666 American Forces Radio and TV Service (AFRTS)............................................................................ Volume 2 - 357 56 02 09 2820 Ashore ATC Equipment..................................................................................................................... Volume 2 - 363 57 02 09 2830 Afloat ATC Equipment....................................................................................................................... Volume 2 - 445 58 02 09 2851 ID Systems.........................................................................................................................................Volume 2 - 471 59 02 09 2867 Joint Precision Approach and Landing System(JPALS).................................................................... Volume 2 - 509 60 02 09 2876 Naval Mission Planning Systems.......................................................................................................Volume 2 - 515 61 02 10 2900 Maritime Integrated Broadcast System..............................................................................................Volume 2 - 533 62 02 10 2906 Tactical/Mobile C4I Systems..............................................................................................................Volume 2 - 537 63 02 10 2914 Intelligence Surveillance and Reconnaissance (ISR)........................................................................ Volume 2 - 551 64 02 10 2915 CANES............................................................................................................................................... Volume 2 - 565 65 02 10 2920 RADIAC..............................................................................................................................................Volume 2 - 579 UNCLASSIFIED Volume 1 - liv === page 57 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 66 02 10 2925 CANES Intell...................................................................................................................................... Volume 2 - 591 67 02 10 2940 Gen Purp Elec Test Equip (GPETE)................................................................................................. Volume 2 - 603 68 02 10 2950 Network Tactical Common Data Link (CDL)......................................................................................Volume 2 - 613 69 02 10 2960 Integ Combat System Test Facility....................................................................................................Volume 2 - 621 70 02 10 2970 EMI Control Instrumentation.............................................................................................................. Volume 2 - 625 71 02 10 2981 In-Service Radars and Sensors.........................................................................................................Volume 2 - 629 72 02 11 2437 Battle Force Tactical Network............................................................................................................Volume 2 - 667 73 02 11 3010 Shipboard Tactical Comms................................................................................................................Volume 2 - 671 74 02 11 3050 Ship Communications Automation..................................................................................................... Volume 2 - 689 75 02 11 3057 Communications Items under $5M.................................................................................................... Volume 2 - 719 76 02 12 3107 Submarine Broadcast Support...........................................................................................................Volume 2 - 725 77 02 12 3130 Submarine Communication Equipment..............................................................................................Volume 2 - 729 78 02 13 3215 Satellite Communications Systems....................................................................................................Volume 2 - 733 79 02 13 3216 Navy Multiband Terminal (NMT)........................................................................................................Volume 2 - 751 80 02 13 3222 Mobile Advanced EHF Terminal (MAT)............................................................................................. Volume 2 - 769 81 02 14 3302 Joint Communications Support Element (JCSE)............................................................................... Volume 2 - 775 82 02 15 3415 Info Systems Security Program (ISSP)..............................................................................................Volume 2 - 779 83 02 15 3417 MIO Intel Exploitation Team.............................................................................................................. Volume 2 - 819 UNCLASSIFIED Volume 1 - lv === page 58 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 84 02 16 3501 Cryptologic Communications Equip................................................................................................... Volume 2 - 823 91 02 17 3620 Coast Guard Equipment.................................................................................................................... Volume 2 - 837 Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 93 03 01 4048 Sonobuoys - All Types...........................................................................................................................Volume 3 - 1 94 03 03 3640 Minotaur............................................................................................................................................... Volume 3 - 31 95 03 03 4204 Weapons Range Support Equipment.................................................................................................. Volume 3 - 35 96 03 03 4213 Aircraft Support Equipment..................................................................................................................Volume 3 - 45 97 03 03 4217 Advanced Arresting Gear (AAG)......................................................................................................... Volume 3 - 77 98 03 03 4219 Electromagnetic Aircraft Launch System (EMALS)............................................................................. Volume 3 - 99 99 03 03 4226 Meteorological Equipment..................................................................................................................Volume 3 - 119 100 03 03 4248 Airborne MCM.................................................................................................................................... Volume 3 - 127 101 03 03 4268 Aviation Support Equipment.............................................................................................................. Volume 3 - 135 102 03 03 4269 UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn.....................................................................Volume 3 - 161 UNCLASSIFIED Volume 1 - lvi === page 59 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 103 04 02 5111 Ship Gun Systems Equipment...............................................................................................................Volume 4 - 1 104 04 03 5227 HARPOON Support Equipment............................................................................................................. Volume 4 - 7 105 04 03 5231 Ship Missile Support Equipment..........................................................................................................Volume 4 - 11 106 04 03 5253 Tomahawk Support Equipment............................................................................................................Volume 4 - 65 107 04 04 5353 CPS Support Equipment......................................................................................................................Volume 4 - 71 108 04 04 5358 Strategic Missile Systems Equip..........................................................................................................Volume 4 - 79 109 04 05 5420 SSN Combat Control Systems............................................................................................................ Volume 4 - 99 110 04 05 5429 ASW Support Equipment................................................................................................................... Volume 4 - 127 111 04 06 5509 EOD Equipment................................................................................................................................. Volume 4 - 141 112 04 06 5510 Directed Energy Systems.................................................................................................................. Volume 4 - 155 113 04 06 5543 Items Less Than $5 Million................................................................................................................Volume 4 - 159 114 04 07 5530 Anti-ship Missile Decoy System.........................................................................................................Volume 4 - 163 115 04 07 5661 Submarine Training Device Mods......................................................................................................Volume 4 - 171 116 04 07 5664 Surface Training Equipment.............................................................................................................. Volume 4 - 185 UNCLASSIFIED Volume 1 - lvii === page 60 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 117 05 01 6003 Passenger Carrying Vehicles.................................................................................................................Volume 5 - 1 118 05 01 6007 General Purpose Trucks........................................................................................................................ Volume 5 - 9 120 05 01 6024 Construction & Maint Equip................................................................................................................. Volume 5 - 21 121 05 01 6027 Fire Fighting Equipment.......................................................................................................................Volume 5 - 47 122 05 01 6028 Tactical Vehicles.................................................................................................................................. Volume 5 - 55 123 05 01 6033 Amphibious Equipment........................................................................................................................ Volume 5 - 63 124 05 01 6058 Pollution Control Equipment................................................................................................................ Volume 5 - 71 125 05 01 6060 Items less than $5 Million.................................................................................................................... Volume 5 - 75 126 05 01 6075 Physical Security Vehicles................................................................................................................. Volume 5 - 117 Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 127 06 01 7025 Supply Equipment.............................................................................................................................. Volume 5 - 121 128 06 01 7066 First Destination Transportation......................................................................................................... Volume 5 - 139 UNCLASSIFIED Volume 1 - lviii === page 61 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title 129 06 01 Special Purpose Supply Systems......................................................................................................Volume 5 - 143 7069 Page Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 130 07 01 8081 Training Support Equipment.............................................................................................................. Volume 5 - 147 131 07 01 8101 Training and Education Equipment....................................................................................................Volume 5 - 153 132 07 02 8106 Command Support Equipment...........................................................................................................Volume 5 - 195 133 07 02 8109 Medical Support Equipment...............................................................................................................Volume 5 - 215 135 07 02 8114 Naval MIP Support Equipment.......................................................................................................... Volume 5 - 223 136 07 02 8118 Operating Forces Support Equipment............................................................................................... Volume 5 - 233 137 07 02 8120 C4ISR Equipment.............................................................................................................................. Volume 5 - 239 138 07 02 8126 Environmental Support Equipment.................................................................................................... Volume 5 - 251 139 07 02 8128 Physical Security Equipment............................................................................................................. Volume 5 - 273 140 07 02 8161 Enterprise Information Technology.................................................................................................... Volume 5 - 297 142 07 05 8164 Next Generation Enterprise Service.................................................................................................. Volume 5 - 309 143 07 05 8645 Cyberspace Activities.........................................................................................................................Volume 5 - 315 UNCLASSIFIED Volume 1 - lix === page 62 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title 144 08 01 Spares and Repair Parts................................................................................................................... Volume 5 - 323 9020 Page UNCLASSIFIED Volume 1 - lx === page 63 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Master Line Item Table of Contents (Alphabetically by Line Item Title) Line Item Title Line Item Number Line # BA BSA Page AN/SLQ-32 2312 46 02 04................... Volume 2 - 167 AN/SQQ-89 Surf ASW Cmbt Sys 2136 39 02 02....................... Volume 2 - 9 ASW Support Equipment 5429 110 04 05................... Volume 4 - 127 Adv Tact Data Link Sys (ATDLS) 2614 51 02 07................... Volume 2 - 315 Advanced Arresting Gear (AAG) 4217 97 03 03..................... Volume 3 - 77 Afloat ATC Equipment 2830 57 02 09................... Volume 2 - 445 Airborne MCM 4248 100 03 03................... Volume 3 - 127 Aircraft Support Equipment 4213 96 03 03..................... Volume 3 - 45 American Forces Radio and TV Service (AFRTS) 2666 55 02 07................... Volume 2 - 357 Amphibious Equipment 6033 123 05 01..................... Volume 5 - 63 Anti-ship Missile Decoy System 5530 114 04 07................... Volume 4 - 163 Ashore ATC Equipment 2820 56 02 09................... Volume 2 - 363 Aviation Support Equipment 4268 101 03 03................... Volume 3 - 135 Battle Force Tactical Network 2437 72 02 11................... Volume 2 - 667 C4ISR Equipment 8120 137 07 02................... Volume 5 - 239 CANES 2915 64 02 10................... Volume 2 - 565 CANES Intell 2925 66 02 10................... Volume 2 - 591 UNCLASSIFIED Volume 1 - lxi === page 64 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page CPS Support Equipment 5353 107 04 04..................... Volume 4 - 71 Chemical Warfare Detectors 0989 23 01 09................... Volume 1 - 459 Coast Guard Equipment 3620 91 02 17................... Volume 2 - 837 Command Support Equipment 8106 132 07 02................... Volume 5 - 195 Command and Control Switchboard 0925 7 01 09................... Volume 1 - 219 Communications Items under $5M 3057 75 02 11................... Volume 2 - 719 Construction & Maint Equip 6024 120 05 01..................... Volume 5 - 21 Cooperative Engagement Capability 2606 49 02 07................... Volume 2 - 273 Cryptologic Communications Equip 3501 84 02 16................... Volume 2 - 823 Cyberspace Activities 8645 143 07 05................... Volume 5 - 315 DDG 1000 Class Support Equipment 0947 16 01 09................... Volume 1 - 387 DDG Mod 0900 5 01 09................... Volume 1 - 129 Deep Subm Sys Proj (DSSP) Equip 0955 18 01 09................... Volume 1 - 415 Directed Energy Systems 5510 112 04 06................... Volume 4 - 155 Diving and Salvage Equipment 1130 26 01 11................... Volume 1 - 495 EMI Control Instrumentation 2970 70 02 10................... Volume 2 - 625 EOD Equipment 5509 111 04 06................... Volume 4 - 141 Electromagnetic Aircraft Launch System (EMALS) 4219 98 03 03..................... Volume 3 - 99 Enterprise Information Technology 8161 140 07 02................... Volume 5 - 297 Environmental Support Equipment 8126 138 07 02................... Volume 5 - 251 UNCLASSIFIED Volume 1 - lxii === page 65 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Extra Large UUV 1613 36 01 15................... Volume 1 - 647 Fire Fighting Equipment 6027 121 05 01..................... Volume 5 - 47 Firefighting Equipment 0910 6 01 09................... Volume 1 - 201 First Destination Transportation 7066 128 06 01................... Volume 5 - 139 Fixed Surveillance System 2225 44 02 03................... Volume 2 - 139 Gen Purp Elec Test Equip (GPETE) 2940 67 02 10................... Volume 2 - 603 General Purpose Trucks 6007 118 05 01....................... Volume 5 - 9 HARPOON Support Equipment 5227 104 04 03....................... Volume 4 - 7 ID Systems 2851 58 02 09................... Volume 2 - 471 In-Service Radars and Sensors 2981 71 02 10................... Volume 2 - 629 Info Systems Security Program (ISSP) 3415 82 02 15................... Volume 2 - 779 Integ Combat System Test Facility 2960 69 02 10................... Volume 2 - 621 Intelligence Surveillance and Reconnaissance (ISR) 2914 63 02 10................... Volume 2 - 551 Items Less Than $5 Million 5543 113 04 06................... Volume 4 - 159 Items less than $5 Million 0981 22 01 09................... Volume 1 - 445 Items less than $5 Million 6060 125 05 01..................... Volume 5 - 75 Joint Communications Support Element (JCSE) 3302 81 02 14................... Volume 2 - 775 Joint Precision Approach and Landing System(JPALS) 2867 59 02 09................... Volume 2 - 509 LCAC 0970 20 01 09................... Volume 1 - 423 LCC 19/20 Extended Service Life Program 0934 9 01 09................... Volume 1 - 279 UNCLASSIFIED Volume 1 - lxiii === page 66 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page LCS Class Support Equipment 0944 13 01 09................... Volume 1 - 335 LCS Common Mission Modules Equipment 1600 30 01 15................... Volume 1 - 563 LCS In-Service Modernization 1604 33 01 15................... Volume 1 - 597 LCS MCM Mission Modules 1601 31 01 15................... Volume 1 - 577 LCS SUW Mission Modules 1603 32 01 15................... Volume 1 - 591 LHA/LHD Midlife 0933 8 01 09................... Volume 1 - 225 LPD Class Support Equipment 0946 15 01 09................... Volume 1 - 349 LSD Midlife & Modernization 1610 37 01 16................... Volume 1 - 653 Large UUV 1612 35 01 15................... Volume 1 - 641 MIO Intel Exploitation Team 3417 83 02 15................... Volume 2 - 819 Maritime Battlespace Awareness 2361 48 02 05................... Volume 2 - 267 Maritime Integrated Broadcast System 2900 61 02 10................... Volume 2 - 533 Medical Support Equipment 8109 133 07 02................... Volume 5 - 215 Medium Unmanned Surface Vehicle (MUSVs) 0954 27 01 12................... Volume 1 - 519 Meteorological Equipment 4226 99 03 03................... Volume 3 - 119 Minesweeping System Replacement 2622 53 02 07................... Volume 2 - 339 Minotaur 3640 94 03 03..................... Volume 3 - 31 Mobile Advanced EHF Terminal (MAT) 3222 80 02 13................... Volume 2 - 769 NAVSTAR GPS Receivers (Space) 2657 54 02 07................... Volume 2 - 343 Naval MIP Support Equipment 8114 135 07 02................... Volume 5 - 223 UNCLASSIFIED Volume 1 - lxiv === page 67 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Naval Mission Planning Systems 2876 60 02 09................... Volume 2 - 515 Naval Tact Cmd Supt Sys (NTCSS) 2611 50 02 07................... Volume 2 - 291 Navy Command and Control System (NCCS) 2618 52 02 07................... Volume 2 - 331 Navy Multiband Terminal (NMT) 3216 79 02 13................... Volume 2 - 751 Network Tactical Common Data Link (CDL) 2950 68 02 10................... Volume 2 - 613 Next Generation Enterprise Service 8164 142 07 05................... Volume 5 - 309 Operating Forces IPE 1445 29 01 14................... Volume 1 - 545 Operating Forces Support Equipment 8118 136 07 02................... Volume 5 - 233 Other Navigation Equipment 0670 3 01 06..................... Volume 1 - 25 Passenger Carrying Vehicles 6003 117 05 01....................... Volume 5 - 1 Physical Security Equipment 8128 139 07 02................... Volume 5 - 273 Physical Security Vehicles 6075 126 05 01................... Volume 5 - 117 Pollution Control Equipment 0935 10 01 09................... Volume 1 - 287 Pollution Control Equipment 6058 124 05 01..................... Volume 5 - 71 RADIAC 2920 65 02 10................... Volume 2 - 579 Reactor Components 1020 25 01 10................... Volume 1 - 491 SPQ-9B Radar 2026 38 02 02....................... Volume 2 - 1 SSN Acoustic Equipment 2150 40 02 02..................... Volume 2 - 47 SSN Combat Control Systems 5420 109 04 05..................... Volume 4 - 99 SURTASS 2237 45 02 03................... Volume 2 - 143 UNCLASSIFIED Volume 1 - lxv === page 68 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Satellite Communications Systems 3215 78 02 13................... Volume 2 - 733 Ship Communications Automation 3050 74 02 11................... Volume 2 - 689 Ship Gun Systems Equipment 5111 103 04 02....................... Volume 4 - 1 Ship Maintenance, Repair and Modernization 1000 24 01 10................... Volume 1 - 471 Ship Missile Support Equipment 5231 105 04 03..................... Volume 4 - 11 Shipboard IW Exploit 2360 47 02 05................... Volume 2 - 217 Shipboard Tactical Comms 3010 73 02 11................... Volume 2 - 671 Small & Medium UUV 1611 34 01 15................... Volume 1 - 625 Small Unmanned Surface Vehicles 0956 19 01 09................... Volume 1 - 419 Sonobuoys - All Types 4048 93 03 01....................... Volume 3 - 1 Spares and Repair Parts 9020 144 08 01................... Volume 5 - 323 Special Purpose Supply Systems 7069 129 06 01................... Volume 5 - 143 Standard Boats 1210 28 01 12................... Volume 1 - 527 Strategic Missile Systems Equip 5358 108 04 04..................... Volume 4 - 79 Strategic Platform Support Equip 0950 17 01 09................... Volume 1 - 407 Sub Periscope, Imaging and Supt Equip Prog 0840 4 01 09..................... Volume 1 - 89 Submarine Acoustic Warfare System 2210 42 02 03..................... Volume 2 - 97 Submarine Batteries 0945 14 01 09................... Volume 1 - 341 Submarine Broadcast Support 3107 76 02 12................... Volume 2 - 725 Submarine Communication Equipment 3130 77 02 12................... Volume 2 - 729 UNCLASSIFIED Volume 1 - lxvi === page 69 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Submarine Support Equipment 0941 11 01 09................... Volume 1 - 309 Submarine Training Device Mods 5661 115 04 07................... Volume 4 - 171 Supply Equipment 7025 127 06 01................... Volume 5 - 121 Surface Combatant HM&E 0200 2 01 02..................... Volume 1 - 17 Surface Power Equipment 0131 1 01 01....................... Volume 1 - 1 Surface Ship Torpedo Def (SSTD) 2213 43 02 03................... Volume 2 - 129 Surface Training Equipment 5664 116 04 07................... Volume 4 - 185 Tactical Vehicles 6028 122 05 01..................... Volume 5 - 55 Tactical/Mobile C4I Systems 2906 62 02 10................... Volume 2 - 537 Tomahawk Support Equipment 5253 106 04 03..................... Volume 4 - 65 Training Support Equipment 8081 130 07 01................... Volume 5 - 147 Training and Education Equipment 8101 131 07 01................... Volume 5 - 153 UMCS-Unman Carrier Aviation(UCA)Mission Cntrl Stn 4269 102 03 03................... Volume 3 - 161 Undersea Warfare Support Equipment 2176 41 02 02..................... Volume 2 - 89 Underwater EOD Equipment 0977 21 01 09................... Volume 1 - 427 Virginia Class Support Equipment 0942 12 01 09................... Volume 1 - 327 Weapons Range Support Equipment 4204 95 03 03..................... Volume 3 - 35 UNCLASSIFIED Volume 1 - lxvii === page 70 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - lxviii === page 71 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (by Appropriation then Line Number) Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 1 01 01 0131 Surface Power Equipment..................................................................................................................... Volume 1 - 1 2 01 02 0200 Surface Combatant HM&E...................................................................................................................Volume 1 - 17 3 01 06 0670 Other Navigation Equipment................................................................................................................Volume 1 - 25 4 01 09 0840 Sub Periscope, Imaging and Supt Equip Prog.................................................................................... Volume 1 - 89 5 01 09 0900 DDG Mod........................................................................................................................................... Volume 1 - 129 6 01 09 0910 Firefighting Equipment....................................................................................................................... Volume 1 - 201 7 01 09 0925 Command and Control Switchboard.................................................................................................. Volume 1 - 219 8 01 09 0933 LHA/LHD Midlife.................................................................................................................................Volume 1 - 225 9 01 09 0934 LCC 19/20 Extended Service Life Program.......................................................................................Volume 1 - 279 10 01 09 0935 Pollution Control Equipment.............................................................................................................. Volume 1 - 287 11 01 09 0941 Submarine Support Equipment..........................................................................................................Volume 1 - 309 12 01 09 0942 Virginia Class Support Equipment..................................................................................................... Volume 1 - 327 13 01 09 0944 LCS Class Support Equipment.......................................................................................................... Volume 1 - 335 14 01 09 0945 Submarine Batteries...........................................................................................................................Volume 1 - 341 15 01 09 0946 LPD Class Support Equipment.......................................................................................................... Volume 1 - 349 16 01 09 0947 DDG 1000 Class Support Equipment................................................................................................Volume 1 - 387 UNCLASSIFIED Volume 1 - lxix === page 72 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 17 01 09 0950 Strategic Platform Support Equip...................................................................................................... Volume 1 - 407 18 01 09 0955 Deep Subm Sys Proj (DSSP) Equip..................................................................................................Volume 1 - 415 19 01 09 0956 Small Unmanned Surface Vehicles................................................................................................... Volume 1 - 419 20 01 09 0970 LCAC..................................................................................................................................................Volume 1 - 423 21 01 09 0977 Underwater EOD Equipment............................................................................................................. Volume 1 - 427 22 01 09 0981 Items less than $5 Million.................................................................................................................. Volume 1 - 445 23 01 09 0989 Chemical Warfare Detectors..............................................................................................................Volume 1 - 459 24 01 10 1000 Ship Maintenance, Repair and Modernization................................................................................... Volume 1 - 471 25 01 10 1020 Reactor Components......................................................................................................................... Volume 1 - 491 26 01 11 1130 Diving and Salvage Equipment..........................................................................................................Volume 1 - 495 27 01 12 0954 Medium Unmanned Surface Vehicle (MUSVs)..................................................................................Volume 1 - 519 28 01 12 1210 Standard Boats.................................................................................................................................. Volume 1 - 527 29 01 14 1445 Operating Forces IPE........................................................................................................................ Volume 1 - 545 30 01 15 1600 LCS Common Mission Modules Equipment...................................................................................... Volume 1 - 563 31 01 15 1601 LCS MCM Mission Modules.............................................................................................................. Volume 1 - 577 32 01 15 1603 LCS SUW Mission Modules...............................................................................................................Volume 1 - 591 33 01 15 1604 LCS In-Service Modernization........................................................................................................... Volume 1 - 597 34 01 15 1611 Small & Medium UUV........................................................................................................................Volume 1 - 625 UNCLASSIFIED Volume 1 - lxx === page 73 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1810N: Other Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 35 01 15 1612 Large UUV......................................................................................................................................... Volume 1 - 641 36 01 15 1613 Extra Large UUV................................................................................................................................Volume 1 - 647 37 01 16 1610 LSD Midlife & Modernization............................................................................................................. Volume 1 - 653 UNCLASSIFIED Volume 1 - lxxi === page 74 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - lxxii === page 75 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (Alphabetically by Line Item Title) Line Item Title Line Item Number Line # BA BSA Page Chemical Warfare Detectors 0989 23 01 09................... Volume 1 - 459 Command and Control Switchboard 0925 7 01 09................... Volume 1 - 219 DDG 1000 Class Support Equipment 0947 16 01 09................... Volume 1 - 387 DDG Mod 0900 5 01 09................... Volume 1 - 129 Deep Subm Sys Proj (DSSP) Equip 0955 18 01 09................... Volume 1 - 415 Diving and Salvage Equipment 1130 26 01 11................... Volume 1 - 495 Extra Large UUV 1613 36 01 15................... Volume 1 - 647 Firefighting Equipment 0910 6 01 09................... Volume 1 - 201 Items less than $5 Million 0981 22 01 09................... Volume 1 - 445 LCAC 0970 20 01 09................... Volume 1 - 423 LCC 19/20 Extended Service Life Program 0934 9 01 09................... Volume 1 - 279 LCS Class Support Equipment 0944 13 01 09................... Volume 1 - 335 LCS Common Mission Modules Equipment 1600 30 01 15................... Volume 1 - 563 LCS In-Service Modernization 1604 33 01 15................... Volume 1 - 597 LCS MCM Mission Modules 1601 31 01 15................... Volume 1 - 577 LCS SUW Mission Modules 1603 32 01 15................... Volume 1 - 591 LHA/LHD Midlife 0933 8 01 09................... Volume 1 - 225 UNCLASSIFIED Volume 1 - lxxiii === page 76 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page LPD Class Support Equipment 0946 15 01 09................... Volume 1 - 349 LSD Midlife & Modernization 1610 37 01 16................... Volume 1 - 653 Large UUV 1612 35 01 15................... Volume 1 - 641 Medium Unmanned Surface Vehicle (MUSVs) 0954 27 01 12................... Volume 1 - 519 Operating Forces IPE 1445 29 01 14................... Volume 1 - 545 Other Navigation Equipment 0670 3 01 06..................... Volume 1 - 25 Pollution Control Equipment 0935 10 01 09................... Volume 1 - 287 Reactor Components 1020 25 01 10................... Volume 1 - 491 Ship Maintenance, Repair and Modernization 1000 24 01 10................... Volume 1 - 471 Small & Medium UUV 1611 34 01 15................... Volume 1 - 625 Small Unmanned Surface Vehicles 0956 19 01 09................... Volume 1 - 419 Standard Boats 1210 28 01 12................... Volume 1 - 527 Strategic Platform Support Equip 0950 17 01 09................... Volume 1 - 407 Sub Periscope, Imaging and Supt Equip Prog 0840 4 01 09..................... Volume 1 - 89 Submarine Batteries 0945 14 01 09................... Volume 1 - 341 Submarine Support Equipment 0941 11 01 09................... Volume 1 - 309 Surface Combatant HM&E 0200 2 01 02..................... Volume 1 - 17 Surface Power Equipment 0131 1 01 01....................... Volume 1 - 1 Underwater EOD Equipment 0977 21 01 09................... Volume 1 - 427 Virginia Class Support Equipment 0942 12 01 09................... Volume 1 - 327 UNCLASSIFIED Volume 1 - lxxiv === page 77 === Executive Summary for Other Procurement, Navy Table 1: FundingOverview Discretionary Mandatory Total BLI 0933 0946 0954 0954 0956 0970 0970 0981 1210 1445 1445 1611 1613 2225 3050 3415 4048 5358 5664 6007 7025 8114 9020 Mandatory Total FY 2025 ($K) FY 2026 ($K) FY 2027 ($K) 15,817,464 14,693,978 18,866,679 31,650 5,802,107 50,000 15,849,114 20,496,085 18,916,679 Table 2: Detailed Mandatory Breakout Reconciliation Bin Title Readiness Readiness Shipbuilding Maritime Superiority Shipbuilding Shipbuilding Readiness Readiness INDOPACOM Capabilities INDOPACOM Capabilities Readiness Shipbuilding Shipbuilding INDOPACOM Capabilities Low-Cost Weapons Low-Cost Weapons Munitions and Supply Chain Nuclear Readiness INDOPACOM Capabilities Shipbuilding INDOPACOM Capabilities Readiness FY 2025 ($K) $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 23,775 $ 7,875 $ $ $ $ $ $ $ $ 31,650 FY 2026 ($K) $ 65,400 $ 29,000 $ 1,950,714 $ $ 694,020 $ 20,148 $ 173 $ 7,400 $ 5,100 $ 117,600 $ 273,000 $ 345,086 $ 3,313 $ 143,000 $ $ $ 80,000 $ 9,180 $ 8,200 $ 200 $ 40,800 $ 21,946 $ 1,987,827 $ 5,802,107 FY 2027 ($K) $ $ $ $ 50,000 $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ $ 50,000 Volume 1 - lxxv === page 78 === MANDATORY FUNDING JUSTIFICATION: The FY 2027 request for Other Procurement, Navy includes $18,866,679 thousand of discretionary and $50,000 thousand of mandatory for a total of $18,916,679 thousand. The mandatory funds support: Medium Uncrewed Surface Vessels (MUSV): The Navy’s FY 2027 mandatory budget request includes $50 million for the procurement of one vessel. The FY 2026 spend plan for Other Procurement, Navy includes $14,693,978 thousand of discretionary and $5,802,107 thousand of mandatory for a total of $20,496,085 thousand. The FY 2025 spend plan for Other Procurement, Navy includes $15,817,464 thousand of discretionary and $31,650 thousand of mandatory for a total of $15,849,114 thousand. Volume 1 - lxxvi === page 79 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 1: Ship Propulsion Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0131 / Surface Power Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 200.968 200.968 200.968 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 20.840 9.978 22.668 0.000 22.668 15.930 15.226 15.528 15.834 13.850 - - - - - - - - - - 20.840 9.978 22.668 0.000 22.668 15.930 15.226 15.528 15.834 13.850 - - - - - - - - - - 20.840 9.978 22.668 0.000 22.668 15.930 15.226 15.528 15.834 13.850 Total 330.822 330.822 330.822 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Surface Power Equipment budget line provides life-cycle support for the following Marine Gas Turbine systems: The General Electric LM2500 Marine Gas Turbine provides main propulsion for the Navy's surface combatants including the CG 47 TICONDEROGA Class, DDG 51 ARLEIGH BURKE Class, and LCS-2 (Austal) Class. The LM2500 is composed of two major sub-assemblies: the gas generator and power turbine sections. It is coupled to the ship drive-train by a high speed coupling shaft. The LM2500+ Marine Gas Turbine and its associated Engineering Control Systems provide main propulsion power for the Navy's amphibious assault ships including the LHD-8 USS MAKIN ISLAND, LHA-6 USS AMERICA and LHA-7 USS TRIPOLI. The LM2500+ is composed of two major sub-assemblies: the gas generator and power turbine sections. It is coupled to the ship drive-train by a high speed coupling shaft. The control system for both engines provides for both local and remote engine operations. The Rolls Royce (Allison) 501-K Series Gas Turbines are used to drive electrical generators in Ship Service Gas Turbine Generators (SSGTG). The 501-K17 is used on the CG-47 Class ships. The 501-K34 is an upgraded version used on the DDG-51 Class ships and is not interchangeable with the 501-K17. The MT5S is a higher-power derivative of the 501-K engine family (utilizing Rolls Royce's new "Marine Trent" or "MT" naming convention vice the older "501-K" naming convention) used for auxiliary electrical generation on DDG-1000 class ships; the MT5S is not interchangeable with the 501-K17 or 501-K34. The MT5S is used within the RR4500 auxiliary turbine generator (ATG) aboard DDG-1000 Class ships. The MT5S-HE+ is used within the AG9160RF SSGTG aboard DDG-51 Flight III ships. Based on the MT5S design, the MT5S-HE+ includes several material changes designed to improve fuel efficiency and increase AG9160RF electrical power output when compared to the RR4500. The Rolls Royce MT-30 is used on LCS-1 (Lockheed) Class for main propulsion and DDG 1000 for electrical generation. Rolls Royce 250-KS4 is used as a starter gas turbine for the 501-K34 on DDG 79 and follow. The Rolls Royce MT7 gas turbine is used for both lift and propulsion fan power on the next generation of LCAC landing craft. Digital Fuel Control (DFC) procurement quantities are based upon the DDG modernization schedule and quantities are procured one year in advance of the scheduled availabilities due to long material lead times. The Surface Power Equipment budget line may also be used to procure spare waterborne shafting (propeller shafts and stern tube shafts) and controllable pitch propeller (CPP) system end items such as propeller blades, hubs and oil distribution (OD) boxes used on DDG 51 class ships. [P40A / PE009 GE Readiness Improvement Upgrade Kits]: PE009 - MODIFICATION KIT PROGRAM: This cost element procures modification kits listed below for the GE Gas Turbine Engine. These modifications increase reliability and fleet readiness through component upgrades which improves the Mean Time Between Failure (MTBF). The modification kits are procured based on historical usage rates, re- LI 0131 - Surface Power Equipment Navy UNCLASSIFIED Page 1 of 15 P-1 Line #1 Volume 1 - 1 === page 80 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 1: Ship Propulsion Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0131 / Surface Power Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A packaged into individual kits, and sent to either a depot to be installed during engine overhauls or to Regional Maintenance Centers for installation. Procurement quantities are not shown because these funds are used to procure a variety of modification kits, with specific kit quantities and prices varying from one year to the next. The kits included in the cost code are as follows: --Accelerometers (Vibration Monitor) -- Compressor Rear Frame Mid-flange Fastener installation -- C-Sump Lubrication Supply Line -- Power Turbine Upgraded Speed Sensor -- Improved Drain Shutoff Valve -- Turbine Mid-Frame Modification -- 7B Piping Modification -- 5-Element to 6-Element Pump Conversion -- T5.4 Flexible Thermo Harness -- Mid Flange Fastener [P40A / PE010 Stock Rotating Spares]: PE010 - GAS GENERATOR: This cost element procures the LM2500 and LM2500+ single shank propulsion gas turbines to support surface combatant and amphibious assault class surface ships. The programs projected in-service population of single shank propulsion gas turbine engines is estimated to be 382 due to new construction. Breakdown of ship class spare procurement is listed below. The procurement of these engines includes all required shipping/storage containers. DDG LM2500 Single Shank Based on experience with 35 years of usage demand data on the LM2500 Engine and IAW 10 USC Sec. 2308, DFAR subpart 207.70 and DoDI 3110.06, a total of 36 spares are required to support the fleet requirements. LCS 2 LM2500 Single Shank. Based on experience with 35 years of usage demand data on the LM2500 Engine and IAW 10 USC Sec. 2308, DFAR subpart 207.70 and DoDI 3110.06, a total of 3 spares are required to support the fleet requirements. As of FY21 no requirement to procure LM2500 Single Shanks. LHD8/LHA6/LHA7 LM2500+ Single Shank Gas Generator Assembly (SST GGA) and Power Turbine Assembly (PTA) Based on experience with 35 years of usage demand data on the LM2500 Engine and IAW 10 USC Sec. 2308, DFAR subpart 207.70 and DoDI 3110.06, a total of 2 spares are required to support the fleet requirements. Based on sparing requirement procurement of 2 additional LM2500+ engines are required. Total of 4 engines are required. LM2500 Hot Section Kits Are procured as required from the below list per quarterly failure analysis and maintained to replace High Pressure Turbine (HPT) components beyond repairable limits. Shortages of replacement blades increase engine repair turn-around time (RTAT) during engine refurbishment/repair as a result of material shortages. Procurement quantities are a result of procuring various kits of various costs. The kits included in the cost code are as follows: --HPT Shrouds --HPT Seal Assembly --HPT Blades --HPT Nozzles --Compressor Blades LI 0131 - Surface Power Equipment Navy UNCLASSIFIED Page 2 of 15 P-1 Line #1 Volume 1 - 2 === page 81 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 1: Ship Propulsion Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0131 / Surface Power Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / PE014 Special Support Equipage]: PE014 Special Support Equipage - This cost element procures Special Support Equipment for all marine gas turbines to support gas turbine change outs and to allow for increased I-level (intermediate level) repair capability, thereby reducing the number of engine change outs required and stabilizing or reducing the cost to overhaul engines at the depot. No installation cost is associated with this cost element. [P40A / PE015 LM2500 DIGITAL FUEL CONTROL]: PE015 - LM2500 DIGITAL FUEL CONTROL (DFC)- This cost element procures the Digital Fuel Control (DFC) shipsets, ancillary equipment and install material to support the CG/DDG modernization schedules. Procurement and installations are budgeted to correspond with CNO ship availabilities. One DFC kit is required to update each of the four LM2500 engines, which makes one DFC shipset. The DFC upgrade is a mandatory portion of DDG-51 modernizations; the modernized machinery control system (MCS) is incapable of interfacing with LM2500 engines not equipped with DFC. The DFC is the most significant change to the LM2500 engine since its inception into the USN that addresses obsolete components which accounted for approximately 40% of all engine failures. In summary, this modification is estimated to be 75% more reliable than the old system. This upgrade also replaces the Hydro-mechanical main fuel control (MFC) system, which was designed for aircraft, with a DFC system designed for a military marine environment. This modification increases engine reliability, decreases periodic maintenance, enhances operational functions, and provides an automatic stall detection and shutdown capability. PE6IN - INSTALLATION FOR DIGITAL FUEL CONTROL (DFC)- This cost element funds the installation of Cost element PE015, LM2500 Digital Fuel Control (DFC) shipsets, as part of the CG/DDG HM&E modernization program. This includes pre-assembly at NSWCPD (Philadelphia), shipping to installation location, shipboard installation, training, post installation operational testing and associated travel cost. [P40A - 2 / PE001 STOCK ROTATING SPARES]: PE001 - STOCK ROTATING SPARES This cost element procures the MT-30 for DDG1000 Zumwalt Class and Littoral Combat Ship (LCS) Independence Variant, MT-5 series gas turbines for the DDG 1000 Zumwalt Class and DDG-51 Flight III program, the 250-KS4 SSGTG starter engines for the DDG 79 and follow, and the 501-K34 gas turbines DDG 51 class ships. The procurement of these engines includes all required shipping/storage containers and necessary hardware to allow for installation of the MT30 gas turbine into DDG1000 or LCS5AF hull types. MT-30 Gas Turbines Based on experience with similar turbines and IAW 10 USC Sec. 2308, DFAR subpart 207.70 and DoDI 3110.06, a total of 6 spares are required to support the fleet. MT-5 Gas Turbines Based on experience with similar turbines and IAW 10 USC Sec. 2308, DFAR subpart 207.70 and DoDI 3110.06, a total of 4 MT-5 spares are required to support the fleet. The in-service population of MT-5S gas turbine engines is six (6) due to new construction of DDG1000 and thirty (30) of the higher efficiency MT5S-HE+ units for DDG-51 Flight III. 250-KS4 SSGTG Starter Engines Based on experience with similar turbines and IAW 10 USC Sec. 2308, DFAR subpart 207.70 and DoDI 3110.06, a total of 12 spares are required to support the fleet requirements. Current spares on-hand is twelve (12) which achieves the baseline sparing requirement. The projected FY-19 in-service population of starter engines is 103 due to new construction, but would be 169 if Flight IIA and Flight III were included. Operation Tomodachi has resulted in the radiological contamination of twelve (12) 250-KS4 Marine Gas Turbines, which created an unplanned requirement to replace the twelve (12) affected engines beginning in FY13. Completion of procurement of 12 replacement engines in FY23. 501-K34 Gas Turbines Based on experience with similar turbines and IAW 10 USC Sec. 2308, DFAR subpart 207.70 and DoDI 3110.06, a total of 26 spares are required to support the fleet requirements. [P40A - 2 / PE007 MODIFICATION PROGRAM]: PE007 - MODIFICATION PROGRAM This cost element procures modification kits listed below for the Rolls Royce Marine Gas Turbines (MGT). Analysis of Rolls Royce MGT engineering performance data, metrics, the SEA 21 Top Tech Issues and the component improvement program has identified necessary improvements to correct Rolls Royce MGT deficiencies. The modifications addresses the Fleet's top maintenance and reliability issues by reducing failure rates of system components, and improve Rolls Royce MGT readiness. LI 0131 - Surface Power Equipment Navy UNCLASSIFIED Page 3 of 15 P-1 Line #1 Volume 1 - 3 === page 82 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 1: Ship Propulsion Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0131 / Surface Power Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A The modification kits are packaged and shipped to the ship for installation during schedule CNO availability by a team of NSWCPD (Philadelphia) and Alteration Installation Team (AIT) personnel. Procurement quantities are not shown because these funds are used to procure a variety of modification kits, with specific kit quantities and prices varying from one year to the next. The kits included in the cost code are as follows: --FADC upgrade conversion --MT30 variant conversion kits [P40A - 3 / PE830 PRODUCTION ENGINEERING]: PE830 PRODUCTION ENGINEERING The review and approval of any production contract technical documentation, or the separate development of this documentation to include: - Technical Manuals - Signal Flow Diagrams - PMS - Level III Production Drawings - Provisioning Technical Documentation (PTD) - Program Support Data - Allowance Parts Lists (APL's) - Engineering in support of final design reviews. This includes efforts associated with tracking and updating Navy Data Environment (NDE), Marine Gas Turbine Information System (MGTIS) and Weblog to reflect completed installations and ensure consistent documentation for engine configuration management. [P40A - 4 / PE110 Propellers and Shafts]: PE110- VARIOUS PROPELLERS AND SHAFTS - This funding procures controllable pitch propeller (CPP) system end items such as propeller blades, hubs and oil distribution (OD) boxes used on DDG 51, LHD 8 and following (AF), LPD, LHA 6 AF, LSD 41, and DDG1000 class ships. These spares are required to DDG 51, LHD 8 and following (AF), LPD, LHA 6 AF, LSD 41, and DDG1000 Fleet demand due to scheduled replacement caused by lifecycle wear and unscheduled replacements caused by Casualty Reports (CASREPs). The component has long repair turnaround times (1-2 years) and thus cannot be repaired and reused during the same availability. The technical requirements and drydocking constraints drives the program to establish a rotatable pool to support replacements. The growing size of the fleet and insufficiency of the current number of DDG 51, LHD 8 and following (AF), LPD, LHA 6 AF, LSD 41, and DDG1000 spares to meet upcoming change-out demand per CNO availability schedules is driving the requirement to increase the number of spares to support a rotatable pool and ensure readiness. A malfunctioning propeller or shaft may result in excessive vibration, which could lead to damage of ship structures and equipment (bearings, main reduction gears, and bulkhead seal), increase of ship cavitation/noise, loss of speed or loss of motion. [P40A - 5 / PE130 - Steam Propulsion Items]: PE130 - STEAM PROPULSION ITEMS - This provides for several initiatives oriented to upgrading boiler efficiency and safety with downstream maintenance effectiveness. In particular, the items procured include: Upgraded Stack Gas Analyzer (SGA) , Optimization Trim Loop Material including fuel oil meters, stack gas temperature sensors, electronic automatic boiler controls interface software/schema to improve steam plant efficiency, Upgraded electronic automatic boiler control (E-ABC) system process controllers/smart transmitters, Upgraded Boiler Water/Feedwater (BW/FW) Chemistry Analysis/Carbohydrazide Implementation Equipment., Upgraded SSTG Protective Devices (Overspeed Trips), and Upgrades to Boiler Igniter System (BIS) (Fuel Valve and Insert/Retract Air Actuators). The Steam Propulsion Improvement Program provides safe and reliable power for ship movement through the water, and, in addition, provides power to ships combat and habitability systems, whether electrical or steam dependent. At any given time, due to propulsion plant casualties, ship propulsion systems may be operating at reduced capability, adversely affecting the ship's mission(s). The Steam Propulsion improvement program encompasses steam and diesel propulsion surface ships in the Fleet, and provides for material upgrades to propulsion systems resulting in increased readiness, safety and reliability. Items can be installed during a scheduled or unscheduled availability by a shipyard, tender/Intermediate Maintenance Activity or Alteration Installation Team (AIT). LI 0131 - Surface Power Equipment Navy UNCLASSIFIED Page 4 of 15 P-1 Line #1 Volume 1 - 4 === page 83 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 1: Ship Propulsion Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0131 / Surface Power Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a General Electric Gas Turbine P-40a Rolls Royce Gas Turbine P-40a PE830 PRODUCTION ENGINEERING P-40a PE110 Propellers and Shafts P-40a PE130 - Steam Propulsion Items P-3a P-40 Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 18.583 - / 0.463 - / 0.658 - / 4.559 - / - - / 4.559 - / 99.452 - / 10.268 - / 7.167 - / 15.232 - / - - / 15.232 - / 2.444 - / 0.360 - / 0.360 - / 0.378 - / - - / 0.378 - / 25.168 - / 9.497 - / 1.537 - / 2.237 - / - - / 2.237 - / 2.344 - / 0.252 - / 0.256 - / 0.262 - / - - / 0.262 1 / PE015 - LM2500 GAS TURBINE DIGITAL FUEL CONTROL (TBD) - / 52.977 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 Total Gross/Weapon System Cost - / 200.968 - / 20.840 - / 9.978 - / 22.668 - / 0.000 - / 22.668 P-5a Exhibits Schedule Exhibit Type Title* P-40a General Electric Gas Turbine P-40a Rolls Royce Gas Turbine P-40a Subexhibits ID CD MDAP/ MAIS Code FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - PE830 PRODUCTION ENGINEERING - / - - / - - / - - / - - / - - / - P-40a PE110 Propellers and Shafts - / - - / - - / - - / - - / - - / - P-40a PE130 - Steam Propulsion Items - / - - / - - / - - / - - / - - P-3a 1 / PE015 - LM2500 GAS TURBINE DIGITAL FUEL CONTROL (TBD) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 52.977 P-40 Total Gross/Weapon System Cost - / 15.930 - / 15.226 - / 15.528 - / 15.834 - / 13.850 - / 330.822 P-5a / - *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The increase in FY 2027 funding is due to the changes to the Full Authority Digital Control (FADC) procurement and installation schedule. FY 2027 funding of $22.668M is required to support procurement of DDG51 Gas Turbine Generator Engine Controller procurements and installations, procurement of non-nuclear surface ship controllable pitch propeller assets, and lesser cost gas turbine parts for depot overhaul kits. Procurements are scheduled to ensure on time delivery of assets for dry dock availabilities, combat obsolescence of specific parts, and maintain up to date configuration of all engines going through overhauls LI 0131 - Surface Power Equipment Navy UNCLASSIFIED Page 5 of 15 P-1 Line #1 Volume 1 - 5 === page 84 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0131 / Surface Power Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: General Electric Gas Turbine FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) PE009 GE Readiness Improvement Upgrade Kits 1.1) MODIFICATION KIT PROGRAM (1) A Subtotal: 1) PE009 GE Readiness Improvement Upgrade Kits - - 2.826 - - 0.463 - - 0.658 - - 0.389 - - - - - 0.389 - - 2.826 - - 0.463 - - 0.658 - - 0.389 - - - - - 0.389 12.632 - - - - - - - - 4.170 - - - - - 4.170 2) PE010 Stock Rotating Spares 2.1) LHD/LHA6 LM2500+ (2) A Subtotal: 2) PE010 Stock Rotating Spares 6,316K 2 - - 12.632 - - - - - - - - 4.170 - - - - - 4.170 - - 2.189 - - - - - - - - - - - - - - - - - 2.189 - - - - - - - - - - - - - - - - - 0.936 - - - - - - - - - - - - - - - Subtotal: 4) PE015 LM2500 DIGITAL FUEL CONTROL - - 0.936 - - - - - - - - - - - - - - - Total - - 18.583 - - 0.463 - - 0.658 - - 4.559 - - - - - 4.559 3) PE014 Special Support Equipage 3.1) Special Support Equipage A Subtotal: 3) PE014 Special Support Equipage 4) PE015 LM2500 DIGITAL FUEL CONTROL 4.1) ANCILLARY EQUIPMENT/ INSTALLATION MATERIALS A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (1) PE009- procures multiple different upgrade modification kits to be installed during overhaul for LM2500s. This can vary from year to year and funds requirement is based on kit needs and overhaul inductions. The FY 2027 cost decrease due to the install schedule. (2) The increase in FY 2027 supports Marine gas turbine procurements to support rotable pools. These spare procurement needs can fluctuate based on failure rates seen in the fleet, repair turnaround time, and available budget therefore the procurements are not steady state year to year. LI 0131 - Surface Power Equipment Navy UNCLASSIFIED Page 6 of 15 P-1 Line #1 Volume 1 - 6 === page 85 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0131 / Surface Power Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Rolls Royce Gas Turbine Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) PE001 STOCK ROTATING SPARES 1.1) 501-K34 A 2,727K 4 10.909 1.2) 250-KS4 A 553,000.00 7 3.871 714,000.00 (†) A 20,234K 3 60.701 - (†) A 4,257K 3 12.770 - A - - - 4,708K - - 88.251 - - - 8.583 - - Subtotal: 2) PE007 MODIFICATION PROGRAM - Total - (†) 1.3) MT-30 1.4) MT-5S 1.5) MT5S-HE+ (3) Subtotal: 1) PE001 STOCK ROTATING SPARES - - - - - - - - - - - - - - - 0.714 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4.708 - - - 4,514K 9.029 - - - 4,514K - 5.422 - - - - - 9.029 - - - - - 9.029 - - 4.386 - - 6.538 - - 5.503 - - - - - 5.503 2.618 - - 0.460 - - 0.629 - - 0.700 - - - - - 0.700 - 11.201 - - 4.846 - - 7.167 - - 6.203 - - - - - 6.203 - 99.452 - - 10.268 - - 7.167 - - 15.232 - - - - - 15.232 1 1 2 2 9.029 2) PE007 MODIFICATION PROGRAM 2.1) PROCURE MODIFICATION KITS A 2.2) INSTALLATION FOR MODIFICATION A (4) KITS (5) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (3) (4) The increase in funding in FY 2027 is due the procurement schedule of the Mt5S-HE+ and to Unit cost increase based on recent procurements and vendor estimates. PE007 MODIFICATION PROGRAM: The FY 2027 funding decrease is based on procurement/ship availability schedules and funding0 to support XT FADC controller procurement. The modification program is designed to procure and install hardware to affect improvements in reliability and maintainability aboard CG-47 and DDG-51 class Ship Service Gas Turbine Generator (SSGTG) units. Each hull has a total of three (3) SSGTG units installed. Each SSGTG is controlled by a Full Authority Digital Control (FADC). CG-47 class uses the 501-K17 and DDG-51 class uses the 501-K34. There are currently three variants of the 501-K34 SSGTG: AG9130, AG9140HF and AG9140RF. The AG9140RF also includes the Remote Independent Mechanical Starting System (RIMSS) consisting of the 250-KS4 engine. The quantity of modification kits procured corresponds to the number of SSGTG units to be upgraded. The type and scope of each modification required will vary from one ship to the next. The number and type of kits installed in any given Fiscal Year (FY) varies depending upon ship availability schedules during that FY. (5) The increase in funding in FY 2027 is due to Unit cost increase based on recent procurements and vendor estimates. LI 0131 - Surface Power Equipment Navy UNCLASSIFIED Page 7 of 15 P-1 Line #1 Volume 1 - 7 === page 86 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 1 Aggregated Items: Rolls Royce Gas Turbine FY Contractor and Location Method/Type or Funding Vehicle 1.2) 250-KS4 2023 ROLLS ROYCE / WALEPOLE, MA SS / FFP NSWCPD May 2023 Sep 2027 1 650,000.00 Y 1.2) 250-KS4 2025 ROLLS ROYCE / WALEPOLE, MA C / TBD NSWCPD Oct 2024 Oct 2028 1 714,000.00 N 1.3) MT-30 2022 ROLLS ROYCE / WALEPOLE, MA SS / FFP NSWCPD May 2022 Sep 2025 1 20,800K Y 1.3) MT-30 2023 ROLLS ROYCE / WALEPOLE, MA C / TBD NSWCPD Oct 2022 Feb 2027 1 20,900K N 1.4) MT-5S 2023 ROLLS ROYCE / WALEPOLE, MA C / TBD NSWCPD May 2023 May 2026 1 4,308K N Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 0131 / Surface Power Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) PE001 STOCK ROTATING SPARES LI 0131 - Surface Power Equipment Navy UNCLASSIFIED Page 8 of 15 P-1 Line #1 Volume 1 - 8 === page 87 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0131 / Surface Power Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: PE830 PRODUCTION ENGINEERING (6) FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) Production Engineering 1.1) Production Engineering A - - 2.444 - - 0.360 - - 0.360 - - 0.378 - - - - - 0.378 Subtotal: 1) Production Engineering - - 2.444 - - 0.360 - - 0.360 - - 0.378 - - - - - 0.378 Total - - 2.444 - - 0.360 - - 0.360 - - 0.378 - - - - - 0.378 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (6) PE830 PRODUCTION ENGINEERING- The review and approval of any production contract technical documentation, or the separate development of this documentation to include: - Technical Manuals - Signal Flow Diagrams - PMS - Level III Production Drawings - Provisioning Technical Documentation (PTD) - Program Support Data - Allowance Parts Lists (APL's) - Engineering in support of final design reviews. This includes efforts associated with tracking and updating Navy Data Environment (NDE), Marine Gas Turbine Information System (MGTIS) and Weblog to reflect completed installations and ensure consistent documentation for engine configuration management. LI 0131 - Surface Power Equipment Navy UNCLASSIFIED Page 9 of 15 P-1 Line #1 Volume 1 - 9 === page 88 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0131 / Surface Power Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) 1) PE110 - Propellers and Shafts -DDG 51 1.1) PE110 Propellers and Shafts - DDG 51 CPP hub Port A 1.3) PE110 Propellers and Shafts - DDG 51 Blade Set ATD Port A 1.4) PE110 Propellers and Shafts - DDG 51 Blade Set ATD STBD A FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: PE110 Propellers and Shafts Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) (7) 1,238K 5 6.188 - - - - - - - - - - - - - - - 1,433K 1 1.433 - - - - - - - - - - - - - - - 1,433K 1 1.433 - - - - - - - - - - - - - - - 9.054 - - - - - - - - - - - - - - - Subtotal: 1) PE110 - Propellers and Shafts -DDG 51 - - 2) PE110 - Propellers and Shafts - LHD8 2.2) PE110 Propellers and Shafts - LHD8 stbd Hub A 2.3) PE110 Propellers and Shafts - LHD8 Port Blade Set A 620,000.00 1 0.620 - - - - - - - - - - - - - - - 1,170K 2 2.340 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.439 - - - - - - - - 1.129 - - - 1,129K Subtotal: 2) PE110 - Propellers and Shafts - LHD8 4) PE110 - Propellers and Shafts - LPD 17 4.1) LPD 17 STBD Hub (9) 4.2) PE110 Propellers and Shafts - LPD17 OD Box A A (10) 4.3) PE110 Propellers and Shafts - LPD17 Stbd Blade Set A 4.4) PE110 Propellers and Shafts A LPD17 Port Hub (11) 4.5) PE110 Propellers and Shafts LPD 17 Port Blade Set A Subtotal: 4) PE110 - Propellers and Shafts - LPD 17 - - 2.960 - - - - - - - - - - 1,107K 1 1.107 0.840 430,000.00 1 0.430 439,000.00 (8) 368,000.00 1 0.368 420,000.00 991,666.67 3 2.975 - - - - - - - 1,111K 1 1.111 - - - - - - 1,129K 848,500.00 2 1.697 1,094K 1.094 - - - - - - - - - - - - 6.151 - 1.934 - - 1.537 - - 1.568 - - - - - 1.568 0.631 - - - 0.669 - - - - - 2 1 - 1 - 1 439,000.00 1 - 0.439 - 1 1.129 5) PE110 - Propellers and Shafts Dummy Hub Balance Arbor 5.1) PE110 Propellers and Shafts A 669,000.00 LI 0131 - Surface Power Equipment Navy 1 0.669 631,000.00 1 UNCLASSIFIED Page 10 of 15 669,492.40 1 P-1 Line #1 669,492.40 1 0.669 Volume 1 - 10 === page 89 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0131 / Surface Power Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 1 Prior Years MDAP/ Item Number / Title [DODIC] 96 Dummy Hub balance Arbor ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: PE110 Propellers and Shafts ($ M) Unit Cost ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) (12) Subtotal: 5) PE110 - Propellers and Shafts Dummy Hub Balance Arbor - - 0.669 - - 0.631 - - - - - 0.669 - - - - - 0.669 6.932 - - - - - - - - - - - - 6) PE110 - Propellers and Shafts - LCS28AF Impeller Assembly 6.1) PE110 Propellers and Shafts - LCS28AF Impeller Assembly A 791,750.00 8 6.334 866,500.00 8 Subtotal: 6) PE110 - Propellers and Shafts - LCS28AF Impeller Assembly - - 6.334 - - 6.932 - - - - - - - - - - - - Total - - 25.168 - - 9.497 - - 1.537 - - 2.237 - - - - - 2.237 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (7) Controllable Pitch Propeller asset procurements are to support rotable pools. These spare procurement needs can fluctuate based on fleet size, failure rates, repair turnaround time and available budget therefore the procurements are not steady state year to year. Pricing in budget exhibit based on Rolls-Royce Pricing (8) (9) Procurement schedule by asset type is based on rotable pool sparing requirements and available funds The FY 2027 decrease is due to the procurement schedule. (10) (11) (12) The FY 2027 funding increase is due to PE110 Propellers and Shafts LPD17 OD box procurement schedule and recent vendor estimates. The FY 2027 increase is due to the LPD17 procurement schedule. The FY 2027 increase is due to the PE110 Propellers and Shafts Dummy hub balance Arbor procurement schedule. LI 0131 - Surface Power Equipment Navy UNCLASSIFIED Page 11 of 15 P-1 Line #1 Volume 1 - 11 === page 90 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0131 / Surface Power Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: PE130 - Steam Propulsion Items FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) Surface Power Equipment 1) Steam Propulsion Items A - - 2.344 - - 0.252 - - 0.256 - - 0.262 - - - - - 0.262 Subtotal: 1) Surface Power Equipment - - 2.344 - - 0.252 - - 0.256 - - 0.262 - - - - - 0.262 Total - - 2.344 - - 0.252 - - 0.256 - - 0.262 - - - - - 0.262 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. LI 0131 - Surface Power Equipment Navy UNCLASSIFIED Page 12 of 15 P-1 Line #1 Volume 1 - 12 === page 91 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 1 P-1 Line Item Number / Title: 0131 / Surface Power Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / PE015 - LM2500 GAS TURBINE DIGITAL FUEL CONTROL MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 52.977 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 52.977 Total - - - - - - - - - - - - 52.977 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 52.977 - - - - - - - - - - - - 52.977 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 52.977 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: PE015 - LM2500 DIGITAL FUEL CONTROL (DFC) - This cost code procures the Digital Fuel Control (DFC) shipsets, ancillary equipment and install material to support the CG/DDG modernization schedules. Procurement and installations are budgeted to correspond with CNO ship availabilities. One DFC kit is required to update each of the four LM2500 engines, which makes one DFC shipset. The DFC upgrade is a mandatory portion of DDG-51 modernizations; the modernized machinery control system (MCS) is incapable of interfacing with LM2500 engines not equipped with DFC. The DFC is the most significant change to the LM2500 engine since its inception into the USN that addresses obsolete components which accounted for approximately 40% of all engine failures. In summary, this modification is estimated to be 75% more reliable than the old system. This upgrade also replaces the Hydro-mechanical main fuel control (MFC) system, which was designed for aircraft, with a DFC system designed for a military marine environment. This modification increases engine reliability, decreases periodic maintenance, enhances operational functions, and provides an automatic stall detection and shutdown capability. PE6IN - INSTALLATION FOR DIGITAL FUEL CONTROL (DFC)- This cost element funds the installation of Cost element PE015, LM2500 Digital Fuel Control (DFC) shipsets, as part of the CG/DDG HM&E modernization program. This includes pre-assembly at NSWCPD (Philadelphia), shipping to installation location, shipboard installation, training, post installation operational testing and associated travel cost. LI 0131 - Surface Power Equipment Navy UNCLASSIFIED Page 13 of 15 P-1 Line #1 Volume 1 - 13 === page 92 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0131 / Surface Power Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 1 / PE015 - LM2500 GAS TURBINE DIGITAL FUEL CONTROL FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: PE015 - LM2500 GAS TURBINE DIGITAL FUEL CONTROL B Kits Recurring 1.1.1) PE015 DIGITAL FUEL CONTROL SHIPSET/ PE6IN INSTALLATION FOR DFC - NonOrganic Subtotal: Recurring Subtotal: PE015 - LM2500 GAS TURBINE DIGITAL FUEL CONTROL Subtotal: Procurement, All Modification Items 26 / 50.235 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 50.235 - / - - / - - / - - / - - / - - / - - / - - / - - / - 26 / 50.235 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 50.235 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 / 0.000 - / 0.000 - / 2.742 / - - / 0.000 - / 2.742 - - / 0.000 26 / 50.235 - / - / 50.235 - 26 / 50.235 / 50.235 - Installation Modification Item 1 of 1: PE015 - LM2500 GAS TURBINE DIGITAL FUEL CONTROL - / 2.742 Subtotal: Installation - / 2.742 - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 0131 - Surface Power Equipment Navy 52.977 0.000 0.000 0.000 0.000 UNCLASSIFIED Page 14 of 15 0.000 0.000 0.000 P-1 Line #1 0.000 0.000 0.000 52.977 Volume 1 - 14 === page 93 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0131 / Surface Power Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / PE015 - LM2500 GAS TURBINE DIGITAL FUEL CONTROL MDAP/MAIS Code: Modification Item 1 of 1: PE015 - LM2500 GAS TURBINE DIGITAL FUEL CONTROL Manufacturer Information Manufacturer Name: General Electric Manufacturer Location: Cincinnati, OH Administrative Leadtime (in Months): 2 Dates Production Leadtime (in Months): 10 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: GOVERNMENT:: Installation Name: PE015 DIGITAL FUEL CONTROL SHIPSET/ PE6IN INSTALLATION FOR DFC Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 26 / 2.742 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 26 / 2.742 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 26 / 2.742 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 26 / 2.742 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 26 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 26 Out 26 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 26 LI 0131 - Surface Power Equipment Navy UNCLASSIFIED Page 15 of 15 P-1 Line #1 Volume 1 - 15 === page 94 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 16 === page 95 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 2: Generators ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0200 / Surface Combatant HM&E Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 503.502 503.502 503.502 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 77.592 62.004 45.267 44.841 44.218 - - - 77.592 62.004 - - 77.592 62.004 103.871 103.871 103.871 0.000 0.000 0.000 103.871 103.871 103.871 103.345 103.345 103.345 To FY 2031 Complete - - - - 45.267 44.841 44.218 - - - - - 45.267 44.841 44.218 - 6.286 Continuing Total 984.640 984.640 984.640 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 38.053 - 0.861 - 0.861 2.182 2.603 6.772 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - Continuing - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This program allows the Navy to better align and identify Hull, Mechanical & Electrical (HM&E) requirements and shipboard upgrades and equipment. This is in support of the in-service Surface Combatants and Amphibious ships to include Class Common Equipment (CCE) to support shorter Regular Overhauls and Selected Restricted Availabilities. These include Ship System Components that require long repair turn-around; CG/DDG - Machinery Control Systems (MCS) Commercial off the Shelf (COTS) Refresh; Ship Control Systems (SCS) procurements and installation in support of the SCS; and other equipment to support the Comprehensive Review Findings following the Fitzgerald and McCain collisions in 2017. [P40A / GB001 - CG/DDG COTS Tech Refresh]: Due to Diminishing Manufacturing Sources and Material Shortages (DMSMS), Commercial Off The Shelf (COTS) equipment must be periodically refreshed to ensure supportability to the Fleet. This cost code is used to fund solutions for HM&E systems that have parts with impending DMSMS impacts. DMSMS solutions, including after-market manufacturing (reverse engineering), bridge-buys, life-of-type buys, modernization through replacement, modification / redesign, and reclamation are implemented to ensure that in-service ships are operational and sustainable throughout the life of the system. DMSMS issues and planned resolutions are implemented both within and outside of standard CNO availabilities (Window of Opportunity (WOO) or Continuous Maintenance Availability (CMAV)) and are impacted by pending fact-of-life influences, including shifting availabilities, modified vendor End of Sale dates, and unforeseen material shortages. [P40A / GB002 - Class Common Equipment]: The Common Class Equipment (CCE) program is to provide Ready-For-Issue (RFI) systems and equipment in support of Surface Combatant ship industrial availabilities and to replace major system equipment which sustains battle damage or major failure. CCE Availability Assets (AAs) ensure warfighting capability, readiness, and on-time deployment by providing RFI long lead time material (LLTM) in case of possible catastrophic damage or major failure on Aegis ships. CCE AAs are procured and stored to support backfit upgrades and emergent maintenance within brief availability windows. The ready accessibility of these assets avoids delays in availability completion caused by lengthy equipment repair turn-around time or acquisition lead time. In addition to AAs, the CCE program also provides for Insurance Assets. These are the major long lead time HM&E equipment/systems, which would prevent a ship from being able to be quickly repaired in order to accomplish its mission due to major damage or battle damage. The CCE program provides for both CG and DDG assets. [P40A / GB003 - Ship Control Systems (Surface Ship Modernization)]: Funds provide support for the procurement and installation of Ship Control Systems (SCS) upgrades on both cruisers and destroyers in support of the Fleet Modernization Program. Ship Control Systems provide lifecycle support for legacy and modernized engineering controls. SCS equipment and components are procured for various ship changes and engineering change proposals for in-service surface combatants and are installed both within and outside of standard CNO availabilities. This effort includes maintaining Land Based Engineering Sites (LBES), CG / DDG system refresh, SCD design engineering, CG / DDG equipment procurement, and CG / DDG ISEA/ILS support. This cost code also provides for funding the necessary software licenses in support of the HM&E COTS systems/equipment for both CG and DDG class ships. Examples of systems requiring software licenses are: Machinery Control System (MCS) components, Voyage Management System, Integrated Bridge System, Integrated Bridge and Navigation System, and Digital Video Surveillance System. LI 0200 - Surface Combatant HM&E Navy UNCLASSIFIED Page 1 of 7 P-1 Line #2 Volume 1 - 17 === page 96 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 2: Generators ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0200 / Surface Combatant HM&E Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / GB6IN - DDG 51 Class Install (Procured under GB003 3.2)]: Install FY27: 3; FY28: 3; FY29: 1; FY30:1; FY31: 1 [P40A / GB004 - Maritime Energy Initiatives (Previously Procured in BLI 0110 and BLI 0120)]: Maritime Energy Initiatives provide surface combatants with technologies/tools that reduce energy usage. This will enhance operational capabilities, allowing for longer time on-station and fewer refuelings. The initiatives consist of: 1) Hull and Hydrodynamics - These initiatives focus on the dynamic forces where the ship contacts the water. They include, but are not limited to hull appendages that reduce drag, thus improving speed and fuel efficiency; 2) Power Generation and Transmission Systems - These initiatives focus on, but are not limited to improving the efficiency of ships' prime movers, generators, main reduction gears, propulsion motors/drives, and shaft-line components; 3) Combat and Ship Systems Support Services These initiatives focus on, but are not limited to improving systems that use electricity when providing support services (e.g. cooling, heating, air, lube oil) to combat machinery, or life support systems; and 4) Decision Aids - These initiatives will inform the sailor of decisions they can make to save energy and improve operational efficiency by consolidating and manipulating ship data and providing it back as actionable information. [P40A / GB004 - Shipboard Energy Dashboard FLT IIA Equipment]: The Shipboard Energy Dashboard FLT IIA technology is a shipboard tool providing real time situational awareness of the energy demand associated with equipment lineup and mission. Technology raises operator awareness of how certain engineering plant lineups and equipment affect fuel consumption rates. Energy savings will be realized through energy usage culture change. [P40A / GB004 - Maritime Energy Initiatives (VSD for CPS)]: The Collective Protective System (CPS) is a full time air filtration system integrated into the ship's HVAC system. The amount of outside supply air delivered to CPS zones varies with filter loading over time and is almost always higher than needed, resulting in above average HVAC loads. Variable Speed Drive (VSD) will be installed as an airflow control component to optimize supply air flow, realizing energy savings from fan motor and reduced HVAC loads. Currently, no funds required in FY26 and out years. [P40A / GB004 - Maritime Energy Initiatives (TMCS)]: The Heating, Ventilation, and Air Conditioning (HVAC) system is the largest distributed system on a Surface Combatant and typically consumes between 25% and 40% of all energy used. Surveys on several DDG-class ships indicate that average space temperatures across the ship were being maintained well below the design temperature. Thermal Management Control System (TMCS) provides centralized control and monitoring of space temperatures at design set-points for each compartment throughout the ship. This technology enables improved operational efficiency of the HVAC system, thereby lowering AC loads and reducing electrical demand. Currently, no funds required in FY26 and out years. [P40A / GB004 - Maritime Energy Initiative Install (Procured prior to transfer)]: Currently, no funds required in FY26 and out years. [P40A / GB005 - HM&E Condition System]: This solution proposed would implement HM&E principles, it would implement a Defense-in-Depth Functional Implementation Architecture (DFIA) and meet the requirements of the standards released by the Information Assurance Technical Authority Board (IA TAB) across all the HM&E systems deploying the ability to protect, detect, react, and restore in a contested environment. The HM&E Condition System will monitor the signals on the HM&E network, both between HM&E systems and also those coming from other functional domains. [P40A / GB006 - Hybrid Electric Drive]: Currently, no funds required in FY26 and out years. [P40A / GB443 - Bridge Integration - Ship Control Systems (BI-SCS)]: In accordance with OPNAV N9 Top Level Requirements (TLR) for Surface Ship Bridge Standardization and Integration (9MAR2020), funding provides solutions to 2018 Comprehensive Review (CR) recommendations 7.3.6, 7.3.7, 7.3.10, and 7.3.11 for DDG-51 ship control and bridge information systems as identified by NAVSEA's DDG-51 Class Design Review Board (DRB) across five major areas of focus including: 1) Adding a physical throttle to the Integrated Bridge and Navigation System (IBNS) Ship Control Console (SCC); 2) Adding a Voyage Data Recorder (VDR) capability; 3) Implementing night vision requirements for lighting and glare reduction from bridge equipment; 4) Replacing troubled Original Equipment Manufacturing (OEM) developed Steering and Propulsion Control with Ship Control System-Government owned (SCS-GOV) Software; 5) Replace critical obsolete IBNS hardware/software. Additionally, in accordance with OPNAV N9 TLR and CR recommendations, Voyage Data Recorder (VDR) Capability for AMPHIBIOUS Ship Classes is funded within this budget and Cost Code. LI 0200 - Surface Combatant HM&E Navy UNCLASSIFIED Page 2 of 7 P-1 Line #2 Volume 1 - 18 === page 97 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 2: Generators ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0200 / Surface Combatant HM&E Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / GB008 - DDG-51 Flight III Unique System Battle Spares]: The Battle Spare procurement is to provide Fleet Commanders the ability to repair major system equipment unique to the Flight III ship configuration in the event of battle damage or major failure. Procurements support long lead-time HM&E systems that would not otherwise be available to support quick repairs to operational ships. These systems include but are not limited to: Power Control Monitors (PCMs), Ship Service Gas Turbine Generators (SSGTGs), Water Mist, High Efficiency Super Capacity (HES-C), and 4160 Switchboards and Load centers. [P40A / GB009 - DDG-51 Flight I, II, & IIA Battle Spares HM&E Systems]: The Battle Spare procurement is to provide Fleet Commanders the ability to repair major system equipment for DDG 51 Flight I, II, & IIA configurations in the event of battle damage or major failure. Procurements support long lead-time HM&E systems that would not otherwise be available to support quick repairs to operational ships. These systems include but are not limited to: Ship Service Gas Turbine Generators (SSGTGs), Refrigeration Modules, and 60 Hz Power Distribution Switchboards (SWBDs). LI 0200 - Surface Combatant HM&E Navy UNCLASSIFIED Page 3 of 7 P-1 Line #2 Volume 1 - 19 === page 98 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 0200 / Surface Combatant HM&E Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 2: Generators ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Surface Combatant HM&E - / 503.502 - / 77.592 - / 62.004 - / 103.871 P-40 Total Gross/Weapon System Cost - / 503.502 - / 77.592 - / 62.004 - / 103.871 - / - - / 103.871 / 0.000 - / 103.871 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The $41.876M increase between FY26 and FY27 is due to funds added for Battle Spares Procurement for DDG-51 Flight I, II, & IIA (GB009). LI 0200 - Surface Combatant HM&E Navy UNCLASSIFIED Page 4 of 7 P-1 Line #2 Volume 1 - 20 === page 99 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0200 / Surface Combatant HM&E Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: Surface Combatant HM&E FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) GB001 - CG/DDG COTS Tech Refresh 1.1) GB001 - CG/DDG COTS Tech Refresh A Subtotal: 1) GB001 - CG/DDG COTS Tech Refresh - - 38.572 - - 0.986 - - 1.131 - - 1.540 - - - - - 1.540 - - 38.572 - - 0.986 - - 1.131 - - 1.540 - - - - - 1.540 - - 17.253 - - - - - 0.725 - - - - - - - - - - - 17.253 - - - - - 0.725 - - - - - - - - - 2) GB002 - Class Common Equipment 2.1) GB002 - Class Common Equipment A Subtotal: 2) GB002 - Class Common Equipment 3) GB003 - Ship Control Systems (Surface Ship Modernization) 3.1) GB003 TWISTED RUDDER A 3.2) GB003 - CG 47 Class (Installed under GB6IN 3.5) A 3.3) GB003 - DDG 51 Class (Installed under A GB6IN 3.6) (2) 3.4) GB003 - Ship Control Systems Software Licenses A 3.5) GB003 - Surface Ship Control System Upgrades for DDG 51 Class A 3.6) GB6IN - CG 47 Class Install (Procured under GB003 3.1) A 3.7) GB6IN - DDG 51 Class Install (Procured under GB003 3.2) A Subtotal: 3) GB003 - Ship Control Systems (Surface Ship Modernization) (1) - - 11.834 - - - - - - - - - - - - - - - - - 9.407 - - - - - - - - - - - - - - - - - 58.233 - - 17.310 - - 10.171 - - 10.374 - - - - - 10.374 - - 3.149 - - - - - - - - - - - - - - - - - 74.518 - - - - - - - - - - - - - - - - - 6.200 - - - - - - - - - - - - - - - - - 31.127 - - 5.760 - - 10.800 - - 12.554 - - - - - 12.554 - - 194.468 - - 23.070 - - 20.971 - - 22.928 - - - - - 22.928 4) GB004 - Maritime Energy Initiatives (Previously Procured in BLI 0110 and BLI 0120) 4.1) GB004 Shipboard Energy Dashboard FLT IIA Equipment A 4.2) GB004 - Maritime Energy Initiatives (VSD for CPS) A (3) - - 1.330 - - 3.500 - - - - - - - - - - - - - - 14.671 - - - - - - - - - - - - - - - LI 0200 - Surface Combatant HM&E Navy UNCLASSIFIED Page 5 of 7 P-1 Line #2 Volume 1 - 21 === page 100 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0200 / Surface Combatant HM&E Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 4.3) GB004 - Maritime Energy Initiatives (TMCS) A 4.4) GB004 - Maritime Energy Initiative Install (Procured prior to transfer) A MAIS Code Unit Cost Subtotal: 4) GB004 - Maritime Energy Initiatives (Previously Procured in BLI 0110 and BLI 0120) ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Surface Combatant HM&E FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - - 34.338 - - - - - - - - - - - - - - - - - 2.778 - - - - - - - - - - - - - - - - - 53.117 - - 3.500 - - - - - - - - - - - - - - 101.209 - - 24.820 - - 21.014 - - 19.827 - - - - - 19.827 - - 101.209 - - 24.820 - - 21.014 - - 19.827 - - - - - 19.827 - - 35.000 - - - - - - - - - - - - - - - - - 35.000 - - - - - - - - - - - - - - - - - 7.000 - - - - - - - - - - - - - - - - - 7.000 - - - - - - - - - - - - - - - 5) GB005 - HM&E Condition System 5.1) GB005 - HM&E Condition System A Subtotal: 5) GB005 - HM&E Condition System 6) GB006 - Hybrid Electric Drive 6.1) GB006 - Hybrid Electric Drive A Subtotal: 6) GB006 - Hybrid Electric Drive 7) GB007 - DDG51 Advanced Degaussing 7.1) DDG 51 Advanced Degaussing A Subtotal: 7) GB007 - DDG51 Advanced Degaussing 8) GB443 - Bridge Integration - Ship Control Systems (BI-SCS) 8.1) Amphibious Class Voyage Data Recorders (VDR) (N95) A 8.2) SCS Gov S/W and SSM on IBNS H/ A W for DDGs (N96) (4) 8.3) Int Bridge Nav Sys (IBNS) to Ship Control Systems (SCS) Conv (N96) A 8.4) Combatant Class Voyage Data Recorders (VDR) (N96) A 8.5) Combatant Class Physical Throttles (N96) A - - 4.754 - - 5.886 - - 4.200 - - 1.809 - - - - - 1.809 - - 18.558 - - 5.963 - - 4.995 - - 4.680 - - - - - 4.680 - - - - - - - - 0.258 - - - - - - - - - - - 4.490 - - 11.507 - - 7.840 - - 6.163 - - - - - 6.163 - - - - - 1.860 - - 0.870 - - 0.924 - - - - - 0.924 LI 0200 - Surface Combatant HM&E Navy UNCLASSIFIED Page 6 of 7 P-1 Line #2 Volume 1 - 22 === page 101 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0200 / Surface Combatant HM&E Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Subtotal: 8) GB443 - Bridge Integration - Ship Control Systems (BI-SCS) Unit Cost ($) Qty (Each) - FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Surface Combatant HM&E FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - 27.802 - - 25.216 - - 18.163 - - 13.576 - - - - - 13.576 - - 29.081 - - - - - - - - - - - - - - - - - 29.081 - - - - - - - - - - - - - - - 9) GB008 - DDG-51 Flight III Unique System Battle Spares 9.1) DDG-51 Flight III Unique System Battle Spares A Subtotal: 9) GB008 - DDG-51 Flight III Unique System Battle Spares 10) GB009 - DDG-51 Flight I, II, & IIA Battle Spares HM&E Systems 10.1) DDG-51 Flight I, II, & IIA Battle Spares A - - - - - - - - - - - 46.000 - - - - - 46.000 Subtotal: 10) GB009 - DDG-51 Flight I, II, & IIA Battle Spares HM&E Systems - - 0.000 - - - - - - - - 46.000 - - - - - 46.000 Total - - 503.502 - - 77.592 - - 62.004 - - 103.871 - - - - - 103.871 (5) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (1) GB003 Procurements in cost code GB003 are dependent upon the specific alterations to be accomplished and an individual ship's configuration. Shipsets of equipment vary in quantities and types of components each fiscal year and within a fiscal year. Quantity of "1" represents the total value of multiple shipsets purchased on multiple contracts for multiple ships. Unit costs for specific alterations are not associated with cost code GB003 due to the varying degree of engineering changes required per ship (ship configuration dependent) and the installation normally occurs outside of CNO availabilities, in either a WOO or CMAV. (2) (3) GB003 Scheduled Procurements for DDG 51 Class (To be installed under GB6IN 5.2): Procurement FY27: 1; FY28: 1; FY29: 1; FY30: 1; FY31: 1 GB004 Maritime Energy Initiatives was a one-year add in FY25 to procure and install lighting upgrades for DDG-51 and the MSC fleet, develop ship energy optimization projects, investigate future combatant hull design, and set up a pilot program to test commercial energy technologies on Navy ships for Shipboard Energy Dashboard FLT IIA. (4) (5) GB443 - Funds shortfalls to planned procurements and installations of SCS GOV due to increase in contract pricing and new requirement for Synchro System Feedback Module (SSM) hardware in IBSN-configured DDGs. GB009 The increased budget total control in FY27 and FY28 is due to Battle Spares Procurement consisting of, but not limited to, Ship Service Gas Turbine Generators (SSGTG), Modular Refrigeration Units, High Pressure Air Compressors (HPACs), Next Generation Surface Search Radar (NGSSR), and SeaRAM launchers for DDG 51 Flight I, II, & IIA. LI 0200 - Surface Combatant HM&E Navy UNCLASSIFIED Page 7 of 7 P-1 Line #2 Volume 1 - 23 === page 102 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 24 === page 103 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 6: Navigation Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 821.070 821.070 821.070 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 97.206 96.945 83.510 0.000 83.510 93.493 85.304 82.898 - - - - - - - - 97.206 96.945 83.510 0.000 83.510 93.493 85.304 82.898 To FY 2031 Complete - Total - 85.024 Continuing - Continuing - 85.024 Continuing - Continuing - - - - - - - - - - 97.206 96.945 83.510 0.000 83.510 93.493 85.304 82.898 85.024 Continuing Continuing 6.969 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 8.302 - 5.455 - 5.455 7.014 8.429 7.464 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This program provides procurement and improvements of navigation equipment to include Inertial Navigation equipment such as gyrocompasses, speed sensors, Electronic Chart Display and Information System (ECDIS) and major components for other navigation systems. ECDIS provides Fleet-wide electronic charting capability, increases navigation and situational awareness, improves safety at sea, and eliminates reliance on paper charts. These systems provide mission critical navigation data to shipboard combat and weapon systems. [P40A / GW054: NAVIGATION TRAINING EQUIPMENT]: Funds are required for the procurement of training equipment for multiple Navigation classrooms in support of Navigation System Technician pipeline maintenance training and ECDIS Operator Training. This includes computer upgrades and software licenses. These upgrades are critical to maintaining Fleet proficiency on operation and maintenance of navigation systems. Field Changes include ECDIS Operator Course Classroom Tech Refresh and additional seats and licenses and upgrade/update Mariner Skills Simulator (MSS) to support Fleet Training Requirements (Radar/Data bases/Models). [P40A / GW063: NAVIGATION CERTIFICATION]: These funds are required for conducting Navigation Certification (NAVCERT) on surface ships, submarines, and carriers as part of fielded upgrades and tech refresh. NAVCERT funding amount varies each fiscal year based on the number and type of equipment and/or field changes installed, the ship class, and location. [P40A / GW068: NAVIGATION CERTIFICATION SUITE]: These funds are required for the procurement of hardware and software to maintain and upgrade a land-based Navigation Certification Suite lab to verify navigation equipment field changes and tech refresh interoperability with existing systems prior to shipboard installation. [P40A / GW830: NAVIGATION MODERNIZATION SUPPORT]: In prior-year budget justification documents, this cost element was called "PRODUCTION ENGINEERING." For the 2027 budget year, the name of this cost element has been updated to better reflect the work being performed. The actual work being performed under this cost element has not changed. These funds are required for the modernization and support of all navigation system hardware, software, and tech refresh procurements and system test and integration. This Cost Element includes indirect costs associated with the procurement and installation of individual field changes and upgrades. These costs would include field change and upgrade support, consolidated engineering support, Program Office support, and other costs. These costs will fluctuate with increases and decreases of overall budget, number and type of field changes and upgrades, and required support. [P3A / GW053: AN/WSN-12]: These funds are for the procurement and installation of AN/WSN-12 Inertial Navigation System - Replacement (INS-R) on surface ships, submarines, and carriers. LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 1 of 64 P-1 Line #3 Volume 1 - 25 === page 104 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 6: Navigation Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P3A - 2 / GW056: NAVY ECDIS]: These funds are required for the procurement and installation of Navy ECDIS hardware and software to replace legacy ECDIS-N capability on surface ships and carriers, and procurement and installation of Navy ECDIS software on submarines. [P3A - 3 / GW061: MK 27 REPLACEMENT]: These funds are required for the installation of AN/WSN-11 replacement for legacy MK27 Backup Heading Reference systems on amphibs. [P3A - 4 / GW062: AN/WSN-7 MODERNIZATION]: These funds are required for the procurement and installation of field changes, upgrades, and Tech Refresh of AN/WSN-7 Inertial Navigation System on surface ships and submarines. [P3A - 5 / GW070: MILITARY GLOBAL POSITIONING SYSTEM (GPS) USER EQUIPMENT (MGUE)]: These funds are required for the procurement of Military GPS User Equipment on submarines. [P3A - 6 / GW071: NAVIGATION NETWORKS]: GW071 title change from Navigation Critical Distribution System to Navigation Networks to incorporate NCDS and NDDS. These funds are required for the procurement and installation of Navigation Critical Distribution System (NCDS) and Navigation Data Distribution System (NDDS) on amphibious ships and carriers. [P3A - 7 / GW072: AUTOMATED CELESTIAL NAVIGATION SYSTEM]: These funds are required for the procurement and installation of Automated Celestial Navigation System (ACNS) on surface ships. [P3A - 8 / GW073: TIME FREQUENCY DISTRIBUTION SYSTEM-REPLACEMENT]: TIME FREQUENCY DISTRIBUTION SYSTEM-REPLACEMENT (TFDS-R): These funds are required for the procurement and installation of Time Frequency Distribution System-Replacement (TFDS-R) on submarines. [P3A - 9 / GW066: SSBN NAVIGATION SENSOR OBSOLESCENCE]: These funds are for the procurement and associated installations which will address obsolescence issues associated with the AN/BSN-2 Digital Depth Detector and TFDS. It also leverages updates to COLUMBIA Class architecture to remove dedicated Mission Critical Control Panel (MCCP). LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 2 of 64 P-1 Line #3 Volume 1 - 26 === page 105 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 6: Navigation Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Other Navigation Equipment - / 564.803 - / 24.092 - / 15.020 - / 16.638 / - - / 16.638 P-3a 1 / GW053: AN/WSN-12 (AN/WSN-12) - / 76.553 - / 8.885 - / 19.879 - / 21.817 - / 0.000 - / 21.817 P-3a 2 / GW056: NAVY ECDIS (NAVY ECDIS) - / 94.429 - / 16.797 - / 15.518 - / 12.089 - / 0.000 - / 12.089 P-3a 3 / GW061: MK 27 REPLACEMENT (MK 27 REPLACEMENT) - / 3.160 - / 0.332 - / 0.169 - / 0.000 - / 0.000 - / 0.000 P-3a 4 / GW062: AN/WSN-7 MODERNIZATION (AN/WSN-7 MODERNIZATION) - / 38.849 - / 6.780 - / 6.068 - / 6.076 - / 0.000 - / 6.076 P-3a 5 / GW070: MILITARY GLOBAL POSITIONING SYSTEM (GPS) USER EQUIPMENT (MGUE) (MILITARY GPS USER EQUIPMENT) - / 0.473 - / 0.271 - / 0.331 - / 0.000 - / 0.000 - / 0.000 P-3a 6 / GW071: NAVIGATION NETWORKS (GW071: NAVIGATION NETWORKS) - / 27.136 - / 28.307 - / 27.161 - / 10.968 - / 0.000 - / 10.968 P-3a 7 / GW072: AUTOMATED CELESTIAL NAVIGATION SYSTEM (GW072: AUTOMATED CELESTIAL NAVIGATION SYSTEM) - / 15.667 - / 8.247 - / 9.759 - / 10.591 - / 0.000 - / 10.591 P-3a 8 / GW073: TIME FREQUENCY DISTRIBUTION SYSTEMREPLACEMENT (TBD) - / 0.000 - / 0.720 - / 1.714 - / 1.560 - / 0.000 - / 1.560 P-3a 9 / GW066: SSBN NAVIGATION SENSOR OBSOLESCENCE (TBD) - / 0.000 - / 2.775 - / 1.326 - / 3.771 - / 0.000 - / 3.771 P-40 Total Gross/Weapon System Cost / 821.070 - / 97.206 - / 96.945 - / 83.510 - / 0.000 - / 83.510 - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code - FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Other Navigation Equipment P-3a 1 / GW053: AN/WSN-12 (AN/WSN-12) - - / 23.010 / - - / 18.636 / - - / 24.384 / - - / 24.296 / - Continuing - / - Continuing - P-3a 2 / GW056: NAVY ECDIS (NAVY ECDIS) - / 15.333 - / 16.910 - / 11.432 - / 11.141 Continuing Continuing P-3a 3 / GW061: MK 27 REPLACEMENT (MK 27 REPLACEMENT) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - P-3a 4 / GW062: AN/WSN-7 MODERNIZATION (AN/WSN-7 MODERNIZATION) - / 5.495 - / 5.239 - / 5.347 - / 5.461 P-3a 5 / GW070: MILITARY GLOBAL POSITIONING SYSTEM (GPS) USER EQUIPMENT (MGUE) (MILITARY GPS USER EQUIPMENT) - / 0.000 - / 0.000 - / 0.000 - P-3a 6 / GW071: NAVIGATION NETWORKS (GW071: NAVIGATION NETWORKS) - / 17.879 - / 14.010 - / 10.269 P-3a 7 / GW072: AUTOMATED CELESTIAL NAVIGATION SYSTEM (GW072: AUTOMATED CELESTIAL NAVIGATION SYSTEM) - / 10.803 - / 11.019 - P-3a 8 / GW073: TIME FREQUENCY DISTRIBUTION SYSTEMREPLACEMENT (TBD) - / 1.548 - / 2.295 P-3a 9 / GW066: SSBN NAVIGATION SENSOR OBSOLESCENCE (TBD) - / 2.759 - / 1.407 P-40 Total Gross/Weapon System Cost - / 93.493 - / 85.304 / 0.000 - / - / 3.661 Continuing Continuing / 0.000 - / 0.000 - - / 14.229 - / 7.647 - / 157.606 / 11.251 - / 11.486 - / 2.820 - / 91.643 - / 2.675 - / 2.731 - / 1.267 - / 14.510 - / 1.188 - / 1.213 - / 0.259 - / 14.698 - / 82.898 - / 85.024 Continuing / 1.075 Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 3 of 64 P-1 Line #3 Volume 1 - 27 === page 106 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 6: Navigation Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Net decrease of $13.436M from FY 2026 to FY 2027 reflects decreases in planned procurement of Navy ECDIS Hardware, installation requirements for NCDS, Navigation Modernization Support and program support services. LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 4 of 64 P-1 Line #3 Volume 1 - 28 === page 107 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: Other Navigation Equipment FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) GW054: NAVIGATION TRAINING EQUIPMENT 1.1) SURFACE NAVIGATION TRAINING EQUIPMENT A - - 8.505 - - 0.701 - - 0.750 - - 0.300 - - - - - 0.300 - - 8.505 - - 0.701 - - 0.750 - - 0.300 - - - - - 0.300 - - 6.738 - - 0.496 - - 0.411 - - 0.396 - - - - - 0.396 - - 21.913 - - 0.833 - - 0.742 - - 0.513 - - - - - 0.513 - - 8.299 - - 1.098 - - 1.000 - - 1.020 - - - - - 1.020 - - 1.498 - - 0.238 - - 0.066 - - 0.087 - - - - - 0.087 - - 38.448 - - 2.665 - - 2.219 - - 2.016 - - - - - 2.016 (1) Subtotal: 1) GW054: NAVIGATION TRAINING EQUIPMENT 2) GW063: NAVIGATION CERTIFICATION 2.1) AMPHIB NAVIGATION A CERTIFICATION 2.2) SURFACE NAVIGATION CERTIFICATION (2) A (3) 2.3) SUBMARINE NAVIGATION CERTIFICATION 2.4) CARRIER NAVIGATION CERTIFICATION A (4) A (5) Subtotal: 2) GW063: NAVIGATION CERTIFICATION 3) GW064: OWN SHIP SPEED (OSS) AND COURSE REPEATERS 3.1) SURFACE OSS AND COURSE REPEATERS A (7) Subtotal: 3) GW064: OWN SHIP SPEED (OSS) AND COURSE REPEATERS (6) - - 0.785 - - 0.330 - - - - - - - - - - - - - - 0.785 - - 0.330 - - - - - - - - - - - - - - 23.170 - - 3.247 - - 3.000 - - 3.057 - - - - - 3.057 - - 23.170 - - 3.247 - - 3.000 - - 3.057 - - - - - 3.057 - 10.276 - - 1.968 - - 0.378 - - 4.147 - - - - - 4.147 4) GW068: NAVIGATION CERTIFICATION SUITE 4.1) SURFACE NAVIGATION CERTIFICATION SUITE A (8) Subtotal: 4) GW068: NAVIGATION CERTIFICATION SUITE 5) GW830: NAVIGATION MODERNIZATION SUPPORT 5.1) AMPHIB MODERNIZATION SUPPORT (Navigation Networks) A - (9) LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 5 of 64 P-1 Line #3 Volume 1 - 29 === page 108 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 5.2) AMPHIB MODERNIZATION A SUPPORT A (11) 5.4) SUBMARINE MODERNIZATION SUPPORT A (12) 5.5) CARRIER MODERNIZATION SUPPORT Code (10) 5.3) SURFACE MODERNIZATION SUPPORT MAIS A (13) Subtotal: 5) GW830: NAVIGATION MODERNIZATION SUPPORT 6) GW Completed P3As Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: Other Navigation Equipment FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - - 17.443 - - 2.733 - - 1.241 - - 0.250 - - - - - 0.250 - - 47.571 - - 6.611 - - 5.157 - - 2.120 - - - - - 2.120 - - 17.288 - - 4.226 - - 1.355 - - 3.631 - - - - - 3.631 - - 7.136 - - 1.611 - - 0.920 - - 1.117 - - - - - 1.117 - - 99.714 - - 17.149 - - 9.051 - - 11.265 - - - - - 11.265 - - 4.434 - - - - - - - - - - - - - - - - - 9.031 - - - - - - - - - - - - - - - - - 12.548 - - - - - - - - - - - - - - - 421,417.58 91 38.349 - - - - - - - - - - - - - - - 58,937.50 16 0.943 - - - - - - - - - - - - - - - 302,692.31 13 3.935 - - - - - - - - - - - - - - - 267,309.73 113 30.206 - - - - - - - - - - - - - - - (14) 6.1) Digital Depth Detector (GW067) Prior Year Historical A 6.2) NAVSSI Capstone (GW058) Prior Year Historical A 6.3) Next Generation Fathometer (GW060) Prior Year Historical A 6.4) AMPHIB AN/ WSN-7B (GW036) Prior Year Historical A 6.5) SUBMARINE AN/ WSN-7B (GW036) Prior Year Historical A 6.6) AMPHIB ECDISN FIELD CHANGES (GW051) Prior Year A (15) (16) (17) (18) (19) Historical (20) 6.7) SURFACE ECDIS-N FIELD CHANGES (GW051) Prior Year Historical A (21) LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 6 of 64 P-1 Line #3 Volume 1 - 30 === page 109 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 6.8) CARRIER ECDIS-N FIELD CHANGES (GW051) Prior Year Historical A 6.9) SPEED LOGS AMPHIB AN/WSN-9 (GW055) Prior Year A MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: Other Navigation Equipment FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 144,866.67 15 2.173 - - - - - - - - - - - - - - - 252,233.33 30 7.567 - - - - - - - - - - - - - - - 50,000.00 11 0.550 - - - - - - - - - - - - - - - 184,164.18 67 12.339 - - - - - - - - - - - - - - - 91,933.33 15 1.379 - - - - - - - - - - - - - - - 144,750.00 24 3.474 - - - - - - - - - - - - - - - 138,750.00 4 0.555 - - - - - - - - - - - - - - - 194,000.00 4 0.776 - - - - - - - - - - - - - - - 664,625.00 24 15.951 - - - - - - - - - - - - - - - 108,866.67 15 1.633 - - - - - - - - - - - - - - - (22) Historical (23) 6.10) SPEED LOGS AMPHIB SWITCHBOARD (GW055) Prior Year Historical (24) 6.11) SPEED LOGS SURFACE AN/WSN-9 (GW055) Prior Year Historical A (29) 6.16) SURFACE (SABER-NAV) (GW069) Prior Year Historical A (28) 6.15) SPEED LOGS CARRIER AN/WSN-8 TECH REFRESH (GW055) Prior Year Historical A (27) 6.14) SPEED LOGS CARRIER AN/WSN-9 (GW055) Prior Year Historical A (26) 6.13) SPEED LOGS SUBMARINE AN/ WSN-9 (SSN) (GW055) Prior Year Historical A (25) 6.12) SPEED LOGS SUBMARINE AN/ WSN-9 (SSBN) (GW055) Prior Year Historical A A (30) 6.17) MK27 REPLACEMENT SUBMARINE AN/ WSN-11 (GW061) Prior Year Historical A (31) LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 7 of 64 P-1 Line #3 Volume 1 - 31 === page 110 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 6.18) MK27 REPLACEMENT SURFACE AN/ WSN-11 (GW061) Prior Year Historical A 6.19) AMPHIB AN/WSN-7 FIELD CHANGE 22 (GW062) Prior Year Historical A 6.20) SURFACE AN/WSN-7 FIELD CHANGE 22 (GW062) Prior Year Historical A 6.21) SURFACE AN/ WSN-7 CDU TECH REFRESH EQT (GW062) Prior Year A MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: Other Navigation Equipment FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 119,117.65 17 2.025 - - - - - - - - - - - - - - - 12,727.27 22 0.280 - - - - - - - - - - - - - - - 12,507.25 69 0.863 - - - - - - - - - - - - - - - - 0.475 - - - - - - - - - - - - - - - (32) (33) (34) Historical - (35) 6.22) SUBMARINE AN/WSN-7A FIELD CHANGE 21 (GW062) Prior Year Historical A 6.23) SUBMARINE AN/WSN-7A FIELD CHANGE 22 (GW062) Prior Year Historical A 6.24) SUBMARINE AN/WSN-7A FIELD CHANGE 23 (GW062) Prior Year Historical A 6.25) SUBMARINE AN/WSN-7A FIELD CHANGE 24 (TI-18) (GW062) Prior A 60,000.00 6 0.360 - - - - - - - - - - - - - - - 60,000.00 7 0.420 - - - - - - - - - - - - - - - 129,000.00 12 1.548 - - - - - - - - - - - - - - - 194,875.00 24 4.677 - - - - - - - - - - - - - - - 216,304.35 23 4.975 - - - - - - - - - - - - - - - 35,000.00 12 0.420 - - - - - - - - - - - - - - - (36) (37) (38) Historical (39) 6.26) SUBMARINE AN/WSN-7A FIELD CHANGE 26 (TI-20) (GW062) Prior Historical A (40) 6.27) SUBMARINE AN/WSN-7 ECI A LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 8 of 64 P-1 Line #3 Volume 1 - 32 === page 111 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 Prior Years MDAP/ Item Number / Title [DODIC] (TI-16/APB-17) (GW062) Prior Year Historical (Each) ($ M) Unit Cost ($) Qty (Each) Unit Cost ($ M) ($) Qty (Each) Unit Cost ($ M) ($) Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) A 35,000.00 10 0.350 - - - - - - - - - - - - - - - 20,400.00 5 0.102 - - - - - - - - - - - - - - - 5,000.00 4 0.020 - - - - - - - - - - - - - - - 25,000.00 44 1.100 - - - - - - - - - - - - - - - 12,333.33 12 0.148 - - - - - - - - - - - - - - - 70,375.00 8 0.563 - - - - - - - - - - - - - - - A A (44) 6.31) SUBMARINE ECI (TI-10/12/14) (GW062) Prior Year Historical ($) Qty FY 2027 OOC Total Cost (43) 6.30) SUBMARINE ECI 14-006-VA (GW062) Prior Year Historical Code Unit Cost FY 2027 Base Total Cost (42) 6.29) SUBMARINE AN/WSN-7 ECI (TI-20/APB-21) (GW062) Prior Year Historical MAIS FY 2026 Total Cost (41) 6.28) SUBMARINE AN/WSN-7 ECI (TI-18/APB-19) (GW062) Prior Year Historical ID CD FY 2025 Total Cost Aggregated Items Title: Other Navigation Equipment A (45) 6.32) CARRIER AN/WSN-7 FIELD CHANGE 22 (GW062) Prior Year Historical A 6.33) CARRIER AN/WSN-7 FIELD CHANGE 27 (GW062) Prior Year Historical A (46) (47) Subtotal: 6) GW Completed P3As - - 164.169 - - - - - - - - - - - - - - - - - 7.824 - - - - - - - - - - - - - - - - - 20.351 - - - - - - - - - - - - - - - - - 21.003 - - - - - - - - - - - - - - - 7) Completed P40As 7.1) SURFACE CONVENTIONAL NAVIGATION FC KITS (GW013) Prior Year Historical (48) 7.2) SUBMARINE CONVENTIONAL NAV FC KITS (GW013) Prior Year Historical A A (49) 7.3) SURFACE INERTIAL NAV SYS ECP/FC KITS A LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 9 of 64 P-1 Line #3 Volume 1 - 33 === page 112 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 Prior Years MDAP/ Item Number / Title [DODIC] (GW029) Prior Year Historical Code Unit Cost ($) Qty (Each) ($ M) Unit Cost ($) Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) A - - 38.668 - - - - - - - - - - - - - - - - - 17.020 - - - - - - - - - - - - - - - - - 44.392 - - - - - - - - - - - - - - - - - 47.562 - - - - - - - - - - - - - - - - - 5.831 - - - - - - - - - - - - - - - 13,450.98 51 0.686 - - - - - - - - - - - - - - - 13,460.32 189 2.544 - - - - - - - - - - - - - - - 13,500.00 10 0.135 - - - - - - - - - - - - - - - - 4.741 - - - - - - - - - - - - - - - (51) 7.5) CARRIER INERTIAL NAV SYS ECP/FC KITS (GW029) Prior Year Historical MAIS FY 2026 Total Cost (50) 7.4) SUBMARINE INERTIAL NAV SYS ECP/FC KITS (GW029) Prior Year Historical ID CD FY 2025 Total Cost Aggregated Items Title: Other Navigation Equipment A (52) 7.6) SUBMARINE AN/ BPS ECDIS-N/VMS FC KITS (GW038) Prior Year Historical A 7.7) SURFACE ECDIS-N ECP/ FIELD CHANGE KITS (GW051) Prior Year A (53) Historical (54) 7.8) CARRIER ECDIS-N ECP/FIELD CHANGE KITS (GW051) Prior Year Historical A (55) 7.9) AMPHIB EMERGENCY NAVIGATION LAPTOP (GW059) Prior Year Historical A 7.10) SURFACE EMERGENCY NAVIGATION LAPTOP (GW059) Prior Year Historical A 7.11) CARRIER EMERGENCY NAVIGATION LAPTOP (GW059) Prior Year Historical A 7.12) SURFACE ECDIS-N MODERNIZATION A (56) (57) (58) - LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 10 of 64 P-1 Line #3 Volume 1 - 34 === page 113 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 Prior Years MDAP/ Item Number / Title [DODIC] (GW056) Prior Year Historical MAIS Code Unit Cost ($) Qty (Each) ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) (59) 7.13) NAVIGATION SHORESITE EQUIPMENT (GW065) Prior Year Historical ID CD FY 2025 Total Cost Aggregated Items Title: Other Navigation Equipment A 689,000.00 4 2.756 - - - - - - - - - - - - - - - (60) 7.14) SSBN NAVIGATION SENSOR OBSOLESCENCE (GW066) Prior Year A - - 7.745 - - - - - - - - - - - - - - - - - 5.161 - - - - - - - - - - - - - - - - - 3.593 - - - - - - - - - - - - - - - Subtotal: 7) Completed P40As - - 230.012 - - - - - - - - - - - - - - - Total - - 564.803 - - 24.092 - - 15.020 - - 16.638 - - - - - 16.638 Historical (61) 7.15) SUBMARINE NAVIGATION CERTIFICATION SUITE (GW068) Prior Year Historical (62) 7.16) CARRIER NAVIGATION CERTIFICATION SUITE (GW068) Prior Year Historical A A (63) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (1) (2) (3) (4) (5) (6) (7) (8) (9) SURFACE NAVIGATION TRAINING EQUIPMENT: The cost decrease from FY 2026 to FY 2027 reflects support services reductions in the Navy ECDIS training classrooms. AMPHIB NAVIGATION CERTIFICATION: Decrease from FY 2026 to FY 2027 due to fewer navigation certification events expected based on navigation fielding plans that fluctuate from year to year. SURFACE NAVIGATION CERTIFICATION: Decrease from FY 2026 to FY 2027 due to fewer navigation certification events expected based on navigation fielding plans that fluctuate from year to year. SUBMARINE NAVIGATION CERTIFICATION: Increase from FY 2026 to FY 2027 and beyond to account for inflation. Navigation certification events are based on fielding plans that fluctuate from year to year. CARRIER NAVIGATION CERTIFICATION: Increase from FY 2026 to FY 2027 due to additional navigation certification events expected based on navigation fielding plans that fluctuate from year to year. GW064: OWN SHIP SPEED (OSS) AND COURSE REPEATERS: Use of this Cost Element ended in FY17. SURFACE OSS AND COURSE REPEATERS: Funding decrease from FY 2026 and out due to no additional requirements for surface OSS and course repeaters. SURFACE NAVIGATION CERTIFICATION SUITE: Decrease from FY 2025 to FY 2026 due to decrease in procurement and engineering support requirements. AMPHIB MODERNIZATION SUPPORT (Navigation Networks): Increase in budget from FY 2026 to FY 2027 due to higher demand in engineering requirements to support (4) four installs on AMPHIB Ships for Navigation Networks. Starting in FY 2028 through FY 2031 the budget reflects a funding add for USS WASP Class Service Life Extension. (10) (11) (12) AMPHIB MODERNIZATION SUPPORT: Decrease in budget from FY 2026 to FY 2027 due to reductions in NAVY ECDIS HW procurements, installs and associated support services on AMPHIB Ships. SURFACE MODERNIZATION SUPPORT: Decrease in budget from FY 2026 to FY 2027 due to reductions in NAVY ECDIS HW procurements, installs and associated support services on SURFACE Ships. SUBMARINE MODERNIZATION SUPPORT: Increase in budget from FY 2026 to FY 2027 to support an increase in procurements by (6) six units to a total of eight (8) procurements and an increase in installs by (1) one to (2) two installs for AN/WSN-7A field change upgrades for TI26 on SUBMARINES. LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 11 of 64 P-1 Line #3 Volume 1 - 35 === page 114 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 (13) (14) (15) (16) (17) (18) (19) (20) (21) (22) (23) (24) (25) (26) (27) (28) (29) (30) (31) (32) (33) (34) (35) (36) (37) (38) (39) (40) (41) (42) (43) (44) (45) (46) (47) (48) (49) (50) (51) P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Aggregated Items Title: Other Navigation Equipment CARRIER MODERNIZATION SUPPORT: Increase in budget from FY 2026 to FY 2027 to support and increase of installs by (2) two to (2) two installs of Navigation Critical Distribution System (NCDS) procured in FY 2025 on CARRIERS. GW Completed P3As Digital Depth Detector (GW067) - Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. NAVSSI Capstone (GW058) - Capture Prior Year Historical totals for completed P3A effort. See prior submissions for details on this completed P3A effort Next Generation Fathometer (GW060)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. AMPHIB AN/WSN-7B (GW036)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. SUBMARINE AN/WSN-7B (GW036)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. AMPHIB ECDIS-N FIELD CHANGES (GW051)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. SURFACE ECDIS-N FIELD CHANGES (GW051)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. CARRIER ECDIS-N FIELD CHANGES (GW051)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. SPEED LOGS AMPHIB AN/WSN-9 (GW055)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. SPEED LOGS AMPHIB SWITCHBOARD (GW055)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. SPEED LOGS SURFACE AN/WSN-9 (GW055)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. SPEED LOGS SUBMARINE AN/WSN-9 (SSBN) (GW055)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. SPEED LOGS SUBMARINE AN/WSN-9 (SSBN) (GW055)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. SPEED LOGS CARRIER AN/WSN-9 (GW055)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. SPEED LOGS CARRIER AN/WSN-8 TECH REFRESH (GW055)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. SURFACE (SABER-NAV) (GW069)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. MK27 REPLACEMENT SUBMARINE AN/WSN-11 (GW061)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. MK27 REPLACEMENT SURFACE AN/WSN-11 (GW061)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. AMPHIB AN/WSN-7 FIELD CHANGE 22 (GW062)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. SURFACE AN/WSN-7 FIELD CHANGE 22 (GW062)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. SURFACE AN/WSN-7 CDU TECH REFRESH EQT (GW062)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. SUBMARINE AN/WSN-7A FIELD CHANGE 21 (GW062)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. SUBMARINE AN/WSN-7A FIELD CHANGE 22 (GW062)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. SUBMARINE AN/WSN-7A FIELD CHANGE 23 (GW062)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. SUBMARINE AN/WSN-7A FIELD CHANGE 24 (TI-18) (GW062)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. SUBMARINE AN/WSN-7A FIELD CHANGE 26 (TI-20) (GW062)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. SUBMARINE AN/WSN-7 ECI (TI-16/APB-17) (GW062)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. SUBMARINE AN/WSN-7 ECI (TI-18/APB-19) (GW062)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. SUBMARINE AN/WSN-7 ECI (TI-20/APB-21) (GW062)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. SUBMARINE ECI 14-006-VA (GW062)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. SUBMARINE ECI (TI-10/12/14) (GW062)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. CARRIER AN/WSN-7 FIELD CHANGE 22 (GW062)- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. CARRIER AN/WSN-7 FIELD CHANGE 27- Completed P3A Prior Year totals. See prior year budgets for details on this P3A cost element. SURFACE CONVENTIONAL NAVIGATION FC KITS- Completed P40A Prior Year totals. See prior year budgets for details on this P40A cost element. SUBMARINE CONVENTIONAL NAV FC KITS- Completed P40A Prior Year totals. See prior year budgets for details on this P40A cost element. SURFACE INERTIAL NAV SYS ECP/FC KITS - Completed P40A Prior Year totals. See prior year budgets for details on this P40A cost element. SUBMARINE INERTIAL NAV SYS ECP/FC KITS - Completed P40A Prior Year totals. See prior year budgets for details on this P40A cost element. LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 12 of 64 P-1 Line #3 Volume 1 - 36 === page 115 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 (52) (53) (54) (55) (56) (57) (58) (59) (60) (61) (62) (63) P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Aggregated Items Title: Other Navigation Equipment CARRIER INERTIAL NAV SYS ECP/FC KITS - Completed P40A Prior Year totals. See prior year budgets for details on this P40A cost element. SUBMARINE AN/BPS ECDIS-N/VMS FC KITS - Completed P40A Prior Year totals. See prior year budgets for details on this P40A cost element. SURFACE SCALABLE ECDIS-N ECP/ FIELD CHANGE KITS- Completed P40A Prior Year totals. See prior year budgets for details on this P40A cost element. CARRIER ECDIS-N ECP/FIELD CHANGE KITS- Completed P40A Prior Year totals. See prior year budgets for details on this P40A cost element. AMPHIB EMERGENCY NAVIGATION LAPTOP- Completed P40A Prior Year totals. See prior year budgets for details on this P40A cost element. SURFACE EMERGENCY NAVIGATION LAPTOP- Completed P40A Prior Year totals. See prior year budgets for details on this P40A cost element. CARRIER EMERGENCY NAVIGATION LAPTOP- Completed P40A Prior Year totals. See prior year budgets for details on this P40A cost element. SURFACE ECDIS-N MODERNIZATION- Completed P40A Prior Year totals. See prior year budgets for details on this P40A cost element. NAVIGATION SHORESITE EQUIPMENT- Completed P40A Prior Year totals. See prior year budgets for details on this P40A cost element. SSBN NAVIGATION SENSOR OBSOLESCENCE- Completed P40A Prior Year totals. See prior year budgets for details on this P40A cost element. SUBMARINE NAVIGATION CERTIFICATION SUITE- Completed P40A Prior Year totals. See prior year budgets for details on this P40A cost element. CARRIER NAVIGATION CERTIFICATION SUITE- Completed P40A Prior Year totals. See prior year budgets for details on this P40A cost element. LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 13 of 64 P-1 Line #3 Volume 1 - 37 === page 116 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 P-1 Line Item Number / Title: 0670 / Other Navigation Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 1 / GW053: AN/WSN-12 MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 76.553 8.885 19.879 21.817 0.000 21.817 23.010 18.636 24.384 - - - - - - - - - 76.553 8.885 19.879 21.817 0.000 21.817 23.010 18.636 24.384 - - - - - - - - - 76.553 8.885 19.879 21.817 0.000 21.817 23.010 18.636 24.384 To FY 2031 Complete 24.296 Continuing - Continuing - 24.296 Continuing - Total - Continuing - - 24.296 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: These funds are for the procurement and installation of AN/WSN-12 Inertial Navigation System - Replacement (INS-R) on surface ships, submarines, and carriers. LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 14 of 64 P-1 Line #3 Volume 1 - 38 === page 117 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / GW053: AN/WSN-12 MDAP/MAIS Code: Models of Systems Affected: GW053: AN/WSN-12 Prior Years Related RDT&E PEs: 0607658N Modification Type: AN/WSN-12 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: GW053: AN/WSN-12 B Kits Recurring (64) 21 / 54.380 1 / 4.162 3 / 12.748 3 / 15.096 - / - 3 / 15.096 3 / 15.413 2 / 10.491 3 / 16.067 3 / 16.405 1.1.2) SUBMARINE AN/WSN-12 - NonOrganic 5 / 11.350 1 / 2.601 2 / 5.306 2 / 5.412 - / - 2 / 5.412 2 / 5.520 2 / 5.631 2 / 5.749 2 / 5.870 Continuing Continuing 1.1.1) SURFACE AN/WSN-12 - NonOrganic Subtotal: Recurring Subtotal: GW053: AN/WSN-12 Subtotal: Procurement, All Modification Items - / 65.730 - 26 / 65.730 / 6.763 / 18.054 - 2 / 6.763 / 18.054 / 20.508 - / - 5 / 20.508 - / - / 20.508 - / - - 5 / 18.054 - / 65.730 - / 6.763 Modification Item 1 of 1: GW053: AN/WSN-12 - / 10.823 - / 2.122 - / 1.825 - / 1.309 Subtotal: Installation - / 10.823 - / 2.122 - / 1.825 - / 1.309 - - / 20.508 - / 20.508 - / 20.933 - 5 / 20.508 / 20.933 - / 16.122 - 5 / 20.933 / 16.122 - / 21.816 - 4 / 16.122 / 21.816 - / - 39 / 144.762 / 22.275 Continuing Continuing 5 / 22.275 Continuing Continuing / 22.275 Continuing Continuing - 5 / 21.816 - - Installation - / 0.000 - / 1.309 - / 2.077 - / 2.514 - / 2.568 - / 2.021 - / 6.061 - / 31.320 / - - / 1.309 - / 2.077 - / 2.514 - / 2.568 - / 2.021 - / 6.061 - / 31.320 24.296 Continuing - Total Total Cost (Procurement + Support + Installation) LI 0670 - Other Navigation Equipment Navy 76.553 8.885 19.879 21.817 0.000 UNCLASSIFIED Page 15 of 64 21.817 23.010 18.636 P-1 Line #3 24.384 Continuing Volume 1 - 39 === page 118 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / GW053: AN/WSN-12 MDAP/MAIS Code: Modification Item 1 of 1: GW053: AN/WSN-12 Manufacturer Information Manufacturer Name: Multiple Vendors Manufacturer Location: Multiple (65) Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 36 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jan 2028 Jan 2029 Jan 2030 Jan 2031 Jan 2032 Jan 2033 Jan 2034 Manufacturer Name: TBD (Surf WSN-12) Manufacturer Location: TBD (66) Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 36 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jan 2028 Jan 2029 Jan 2030 Jan 2031 Jan 2032 Jan 2033 Jan 2034 Installation Information Method of Implementation: AIT:: Installation Name: SURFACE AN/WSN-12 Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 12 / 9.216 Prior Years 3 / 2.122 4 / 1.082 2 / 0.000 0 / 0.000 2 / 0.000 - / - - / - - / - - / - 0 / 0.000 21 / 12.420 FY 2025 - / - - / - - / - 0 / 0.552 0 / 0.000 0 / 0.552 1 / 0.000 - / - - / - - / - 0 / 0.000 1 / 0.552 FY 2026 - / - - / - - / - - / - - / - - / - 0 / 1.691 3 / 0.000 - / - - / - 0 / 0.000 3 / 1.691 FY 2027 - / - - / - - / - - / - - / - - / - - / - 0 / 1.726 3 / 0.000 - / - 0 / 0.000 3 / 1.726 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 1.763 3 / 0.000 0 / 0.000 3 / 1.763 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 1.200 2 / 0.000 2 / 1.200 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 1.799 3 / 1.799 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 1.799 3 / 1.799 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total LI 0670 - Other Navigation Equipment Navy 12 / 9.216 3 / 2.122 4 / 1.082 2 / 0.552 0 / 0.000 UNCLASSIFIED Page 16 of 64 2 / 0.552 1 / 1.691 3 / 1.726 P-1 Line #3 3 / 1.763 3 / 1.200 / - 8 / 3.598 - / - 39 / 22.950 Volume 1 - 40 === page 119 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / GW053: AN/WSN-12 MDAP/MAIS Code: Modification Item 1 of 1: GW053: AN/WSN-12 Installation Information Method of Implementation: AIT:: Installation Name: SURFACE AN/WSN-12 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 12 - - - 3 - 4 - - - 2 - - - 1 - - - 3 - - - 3 - - - 3 - - 8 39 Out 12 - - - 3 - 4 - - - 2 - - - 1 - - - 3 - - - 3 - - - 3 - - 8 39 Method of Implementation: [none specified]:: Installation Name: SUBMARINE AN/WSN-12 Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 1 / 1.607 - / - 2 / 0.743 2 / 0.757 0 / 0.000 2 / 0.757 - / - - / - - / - - / - 0 / 0.000 5 / 3.107 FY 2025 - / - - / - - / - - / - - / - - / - 1 / 0.386 - / - - / - - / - 0 / 0.000 1 / 0.386 FY 2026 - / - - / - - / - - / - - / - - / - - / - 2 / 0.788 - / - - / - 0 / 0.000 2 / 0.788 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.805 - / - 0 / 0.000 2 / 0.805 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.821 0 / 0.000 2 / 0.821 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.821 2 / 0.821 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.821 2 / 0.821 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.821 2 / 0.821 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 1 / 1.607 - / - 2 / 0.743 2 / 0.821 6 / 2.463 2 / 0.757 0 / 0.000 2 / 0.757 1 / 0.386 2 / 0.788 2 / 0.805 - / - 18 / 8.370 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 1 - - - - - 2 - - - 2 - - - 1 - - - 2 - - - 2 - - - 2 - - 6 18 Out 1 - - - - - 2 - - - 2 - - - 1 - - - 2 - - - 2 - - - 2 - - 6 18 Footnotes: (64) (65) (66) SURFACE AN/WSN-12 PROCUREMENT: Procurement costs increased from FY 2026 to FY 2027 to account for increased unit costs from higher than usual inflation and material/labor costs. SUBMARINE AN-WSN-12 INSTALLATION:. Two planned installations in FY27. SURFACE AN-WSN-12 INSTALLATION: Reduced installation plans in FY27 are based on increased installation costs. Production Lead Time (PLT) is 36 months, install funding required one year prior to planned installations. FY27 install funding covers one install in FY28. LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 17 of 64 P-1 Line #3 Volume 1 - 41 === page 120 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 P-1 Line Item Number / Title: 0670 / Other Navigation Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 2 / GW056: NAVY ECDIS MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 94.429 16.797 15.518 12.089 0.000 12.089 15.333 16.910 11.432 - - - - - - - - - 94.429 16.797 15.518 12.089 0.000 12.089 15.333 16.910 11.432 - - - - - - - - - 94.429 16.797 15.518 12.089 0.000 12.089 15.333 16.910 11.432 To FY 2031 Complete 11.141 Continuing - Continuing - 11.141 Continuing - Total - Continuing - - 11.141 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: These funds are required for the procurement and installation of Navy ECDIS hardware and software to replace legacy ECDIS-N capability on surface ships and carriers, and procurement and installation of Navy ECDIS software on submarines. [SURFACE NAVY ECDIS HARDWARE] LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 18 of 64 P-1 Line #3 Volume 1 - 42 === page 121 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / GW056: NAVY ECDIS MDAP/MAIS Code: Models of Systems Affected: GW056: NAVY ECDIS Prior Years Modification Type: NAVY ECDIS FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 2: NAVY ECDIS NONRECURRING B Kits Non-Recurring 1.1.1) NAVY ECDIS ACQUISITION DOCUMENTATION - Organic 1.1.2) NAVY ECDIS HARDWARE - Organic (67) Subtotal: Non-Recurring Subtotal: NAVY ECDIS NON-RECURRING - / 5.880 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 15.076 - / 6.628 - / 0.500 - / 0.510 - / - - / 0.510 - / 0.520 - / 0.531 - / 0.542 - / 0.553 - / 20.956 - / 6.628 - / 0.500 - / 0.510 - / - - / 0.510 - / 0.520 - / 0.531 - / 0.542 - / 0.553 - / 20.956 - / 6.628 - / 0.500 - / 0.510 - / - - / 0.510 - / 0.520 - / 0.531 - / 0.542 - / 0.553 - / 40.374 - / 2.182 - / 0.357 - / 0.360 - / - - / 0.360 - / 0.302 - / 0.308 - / 0.315 - / 0.321 - / - - / 5.880 / - - / 24.860 / 0.000 - / 30.740 / - - / 30.740 Modification Item 2 of 2: NAVY ECDIS PROCUREMENT B Kits Recurring 2.1.1) NAVY ECDIS SOFTWARE PRODUCTION Organic (68) 2.1.2) AMPHIB NAVY ECDIS HARDWARE NonOrganic 7 / 4.012 5 / 4.571 - / - - / - - / - 5 / 4.756 2 / 1.940 2 / 1.981 2 / 2.022 - / - 31 / 24.503 16 / 0.000 5 / 0.000 7 / 0.000 3 / 0.000 - / - 3 / 0.000 4 / 0.000 9 / 0.000 9 / 0.000 9 / 0.000 4 / 0.000 66 / 0.000 16 / 13.557 2 / 0.688 3 / 2.743 1 / 0.933 - / - 1 / 0.933 2 / 1.902 1 / 0.971 1 / 0.991 1 / 1.012 1 / 1.033 28 / 23.830 47 / 0.000 6 / 0.000 11 / 0.000 2 / 0.000 - / - 2 / 0.000 7 / 0.000 7 / 0.000 7 / 0.000 7 / 0.000 8 / 0.000 102 / 0.000 1 / 0.363 1 / 0.445 2 / 2.273 1 / 1.159 - / - 1 / 1.159 3 / 3.540 2 / 2.404 1 / 1.224 1 / 1.250 1 / 1.276 13 / 13.934 7 / 0.000 2 / 0.000 2 / 0.000 2 / 0.000 - / - 2 / 0.000 1 / 0.000 3 / 0.000 2 / 0.000 2 / 0.000 2 / 0.000 23 / 0.000 / 1.140 - / - - - - (70) 2.1.4) SURFACE NAVY ECDIS HARDWARE NonOrganic (71) 2.1.5) SURFACE NAVY ECDIS SOFTWARE NonOrganic (72) 2.1.6) CARRIER NAVY ECDIS HARDWARE NonOrganic (73) 2.1.7) CARRIER NAVY ECDIS SOFTWARE NonOrganic (74) 2.1.8) SUBMARINE NAVY ECDIS SOFTWARE SUSTAINMENT - Organic - (75) Subtotal: Recurring Subtotal: NAVY ECDIS PROCUREMENT Subtotal: Procurement, All Modification Items Continuing 8 / 5.221 (69) 2.1.3) AMPHIB NAVY ECDIS SOFTWARE NonOrganic Continuing - / - - / 1.100 / 59.515 - / 8.427 95 / 59.515 - / 80.471 23 / 8.427 - / 15.055 - / 1.120 - / 11.064 - 30 / 11.064 - / 11.564 - / 3.592 - / - 9 / 3.592 - / - / 4.102 - / - / 1.140 / 3.592 9 / 3.592 - / 4.102 - / 1.170 - / 1.190 - / 1.215 - / 1.241 - / 11.670 - / 6.813 - / 5.726 - 22 / 11.670 - / 12.190 24 / 6.813 - / 7.344 22 / 5.726 - / 6.268 / - / 8.176 / 5.846 Continuing Continuing 22 / 5.846 Continuing Continuing / 6.399 Continuing Continuing - Installation LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 19 of 64 P-1 Line #3 Volume 1 - 43 === page 122 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: GW056: NAVY ECDIS Prior Years Financial Plan Modification Number / Title: 2 / GW056: NAVY ECDIS Modification Type: NAVY ECDIS FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Modification Item 2 of 2: NAVY ECDIS PROCUREMENT - / 13.958 - / 1.742 - / 3.954 - / 7.987 Subtotal: Installation - / 13.958 - / 1.742 - / 3.954 - / 7.987 - / 0.000 - / 7.987 - / 3.143 - / 9.566 - / 5.164 - / 4.742 - / 6.122 - / 56.378 / - - / 7.987 - / 3.143 - / 9.566 - / 5.164 - / 4.742 - / 6.122 - / 56.378 11.141 Continuing - Total Total Cost (Procurement + Support + Installation) LI 0670 - Other Navigation Equipment Navy 94.429 16.797 15.518 12.089 0.000 UNCLASSIFIED Page 20 of 64 12.089 15.333 16.910 P-1 Line #3 11.432 Continuing Volume 1 - 44 === page 123 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 P-1 Line Item Number / Title: 0670 / Other Navigation Equipment ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / GW056: NAVY ECDIS MDAP/MAIS Code: Modification Item 1 of 2: NAVY ECDIS NON-RECURRING LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 21 of 64 P-1 Line #3 Volume 1 - 45 === page 124 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 P-1 Line Item Number / Title: 0670 / Other Navigation Equipment ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / GW056: NAVY ECDIS MDAP/MAIS Code: Modification Item 2 of 2: NAVY ECDIS PROCUREMENT Manufacturer Information Manufacturer Name: TBD (CARRIER NAVY ECDIS SOFTWARE) Manufacturer Location: TBD (76) Administrative Leadtime (in Months): 4 Production Leadtime (in Months): 0 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2025 Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Delivery Dates Mar 2025 Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Manufacturer Name: TBD (CARRIER NAVY ECDIS HARDWARE) Manufacturer Location: TBD (77) Administrative Leadtime (in Months): 4 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Feb 2025 Feb 2026 Feb 2027 Feb 2028 Feb 2029 Feb 2030 Feb 2031 Delivery Dates Feb 2027 Feb 2028 Feb 2029 Feb 2030 Feb 2031 Feb 2032 Feb 2033 Manufacturer Name: TBD (AMPHIB NAVY ECDIS SOFTWARE) Manufacturer Location: CHARLOTTESVILLE, VA (78) Administrative Leadtime (in Months): 4 Production Leadtime (in Months): 0 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2025 Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Delivery Dates Mar 2025 Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Manufacturer Name: TBD (SURFACE NAVY ECDIS HARDWARE) Manufacturer Location: TBD (79) Administrative Leadtime (in Months): 4 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Feb 2025 Feb 2026 Feb 2027 Feb 2028 Feb 2029 Feb 2030 Feb 2031 Delivery Dates Feb 2026 Feb 2028 Feb 2029 Feb 2030 Feb 2031 Feb 2032 Feb 2033 Manufacturer Name: TBD (SURFACE NAVY ECDIS SOFTWARE) Manufacturer Location: TBD (80) Administrative Leadtime (in Months): 4 Production Leadtime (in Months): 0 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2025 Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Delivery Dates Mar 2025 Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Manufacturer Name: TBD (AMPHIB NAVY ECDIS HW) Administrative Leadtime (in Months): 4 LI 0670 - Other Navigation Equipment Navy (81) Manufacturer Location: TBD Production Leadtime (in Months): 24 UNCLASSIFIED Page 22 of 64 P-1 Line #3 Volume 1 - 46 === page 125 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / GW056: NAVY ECDIS MDAP/MAIS Code: Modification Item 2 of 2: NAVY ECDIS PROCUREMENT Manufacturer Information Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Feb 2025 Feb 2026 Feb 2027 Feb 2028 Feb 2029 Feb 2030 Feb 2031 Delivery Dates Feb 2027 Feb 2028 Feb 2029 Feb 2030 Feb 2031 Feb 2032 Feb 2033 Installation Information Method of Implementation: AIT:: Installation Name: AMPHIB NAVY ECDIS HARDWARE Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 6 / 2.835 2 / 0.000 - - / - - / - - / - - / - - / - 0 / 0.000 8 / 2.835 FY 2025 - / - 0 / 0.507 4 / 2.794 3 / 0.000 0 / 0.000 3 / 0.000 - / - - / - - / - - / - 0 / 0.000 7 / 3.301 FY 2026 - / - - / - - / - 0 / 3.800 0 / 0.000 0 / 3.800 4 / 0.969 1 / 0.000 - / - - / - 0 / 0.000 5 / 4.769 FY 2027 - / - - / - - / - - / - - / - - / - - / - - - / - - / - - FY 2028 - / - - / - - / - - / - - / - - / - - / - 0 / 4.942 5 / 0.000 - / - 0 / 0.000 5 / 4.942 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 2.019 2 / 0.000 0 / 0.000 2 / 2.019 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 2.061 2 / 0.000 2 / 2.061 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 2.105 2 / 2.105 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total 6 / 2.835 Installation Cost 2 / 0.507 / - - 4 / 2.794 / - - 3 / 3.800 / - 0 / 0.000 3 / 3.800 4 / 0.969 / - 1 / 4.942 5 / 2.019 2 / 2.061 / - - / - 4 / 2.105 / - - / - 31 / 22.032 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 6 - - 2 - - - 4 - - - 3 - - - 4 - - 1 - - - - 5 - - - 2 - 4 31 Out 6 - - 2 - - - 4 - - - 3 - - - 4 - - 1 - - - - 5 - - - 2 - 4 31 Method of Implementation: AIT:: Installation Name: AMPHIB NAVY ECDIS SOFTWARE Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - Prior Years / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 16 / 0.426 FY 2025 - / - 5 / 0.268 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 5 / 0.268 FY 2026 - / - - 7 / 0.383 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 7 / 0.383 LI 0670 - Other Navigation Equipment Navy 16 / 0.426 / - UNCLASSIFIED Page 23 of 64 P-1 Line #3 Volume 1 - 47 === page 126 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / GW056: NAVY ECDIS MDAP/MAIS Code: Modification Item 2 of 2: NAVY ECDIS PROCUREMENT Installation Information Method of Implementation: AIT:: Installation Name: AMPHIB NAVY ECDIS SOFTWARE Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) FY 2027 - / - - / - - / - 3 / 0.167 0 / 0.000 3 / 0.167 - / - - / - - / - - / - 0 / 0.000 3 / 0.167 FY 2028 - / - - / - - / - - / - - / - - / - 4 / 0.228 - / - - / - - / - 0 / 0.000 4 / 0.228 FY 2029 - / - - / - - / - - / - - / - - / - - / - 9 / 0.522 - / - - / - 0 / 0.000 9 / 0.522 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 9 / 0.533 - / - 0 / 0.000 9 / 0.533 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 9 / 0.544 0 / 0.000 9 / 0.544 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.237 4 / 0.237 9 / 0.544 4 / 0.237 66 / 3.308 Installation Cost Total 16 / 0.426 5 / 0.268 7 / 0.383 3 / 0.167 0 / 0.000 3 / 0.167 4 / 0.228 9 / 0.522 9 / 0.533 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 16 - 5 - - - 7 - - - 3 - - - 4 - - - 9 - - - 9 - - - 9 - - 4 66 Out 16 - 5 - - - 7 - - - 3 - - - 4 - - - 9 - - - 9 - - - 9 - - 4 66 Method of Implementation: AIT:: Installation Name: SURFACE NAVY ECDIS HARDWARE Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - Prior Years / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 16 / 8.933 FY 2025 - / - 0 / 0.317 2 / 0.000 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 0.317 FY 2026 - / - - / - - / - 0 / 2.798 0 / 0.000 0 / 2.798 3 / 0.000 - / - - / - - / - 0 / 0.000 3 / 2.798 FY 2027 - / - - / - - / - - / - - / - - / - 0 / 0.951 1 / 0.000 - / - - / - 0 / 0.000 1 / 0.951 FY 2028 - / - - / - - / - - / - - / - - / - - / - 0 / 1.942 2 / 0.000 - / - 0 / 0.000 2 / 1.942 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.991 1 / 0.000 0 / 0.000 1 / 0.991 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 1.012 1 / 0.000 1 / 1.012 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 1.012 1 / 1.012 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 1.012 1 / 1.012 1 / 1.012 3 / 2.024 28 / 18.968 Total LI 0670 - Other Navigation Equipment Navy 16 / 8.933 16 / 8.933 - / - 0 / 0.317 2 / 0.000 0 / 2.798 0 / 0.000 UNCLASSIFIED Page 24 of 64 0 / 2.798 3 / 0.951 1 / 1.942 P-1 Line #3 2 / 0.991 Volume 1 - 48 === page 127 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / GW056: NAVY ECDIS MDAP/MAIS Code: Modification Item 2 of 2: NAVY ECDIS PROCUREMENT Installation Information Method of Implementation: AIT:: Installation Name: SURFACE NAVY ECDIS HARDWARE Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 16 - - - - - 2 - - - - - - - - 3 - - - 1 - - - 2 - - - 1 - 3 28 Out 16 - - - - - 2 - - - - - - - - 3 - - - 1 - - - 2 - - - 1 - 3 28 Method of Implementation: AIT:: Installation Name: SURFACE NAVY ECDIS SOFTWARE Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - 47 / 1.253 Prior Years / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 47 / 1.253 - / - 6 / 0.350 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 6 / 0.350 FY 2026 - / - - / - 11 / 0.655 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 11 / 0.655 FY 2027 - / - - / - - / - 2 / 0.121 0 / 0.000 2 / 0.121 - / - - / - - / - - / - 0 / 0.000 2 / 0.121 FY 2028 - / - - / - - / - - / - - / - - / - 7 / 0.434 - / - - / - - / - 0 / 0.000 7 / 0.434 FY 2029 - / - - / - - / - - / - - / - - / - - / - 7 / 0.442 - / - - / - 0 / 0.000 7 / 0.442 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 7 / 0.451 - / - 0 / 0.000 7 / 0.451 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / 0.461 0 / 0.000 7 / 0.461 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 8 / 0.538 8 / 0.538 7 / 0.461 8 / 0.538 102 / 4.705 Total 47 / 1.253 6 / 0.350 11 / 0.655 2 / 0.121 0 / 0.000 2 / 0.121 7 / 0.434 7 / 0.442 7 / 0.451 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 47 - 6 - - - 11 - - - 2 - - - 7 - - - 7 - - - 7 - - - 7 - - 8 102 Out 47 - 6 - - - 11 - - - 2 - - - 7 - - - 7 - - - 7 - - - 7 - - 8 102 Method of Implementation: AIT:: Installation Name: CARRIER NAVY ECDIS HARDWARE Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 0 / 0.324 1 / 0.000 - - - - - - - - 0 / 0.000 1 / 0.324 Prior Years LI 0670 - Other Navigation Equipment Navy / - / - / - UNCLASSIFIED Page 25 of 64 / - / - / - P-1 Line #3 / - / - Volume 1 - 49 === page 128 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / GW056: NAVY ECDIS MDAP/MAIS Code: Modification Item 2 of 2: NAVY ECDIS PROCUREMENT Installation Information Method of Implementation: AIT:: Installation Name: CARRIER NAVY ECDIS HARDWARE Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - FY 2025 - / - 0 / 0.181 1 / 0.000 - / - - / - - / - - / - 0 / 0.000 1 / 0.181 FY 2026 - / - - / - - / - 0 / 0.976 0 / 0.000 0 / 0.976 2 / 0.000 - / - - / - - / - 0 / 0.000 2 / 0.976 FY 2027 - / - - / - - / - - / - - / - - / - 0 / 0.497 1 / 0.000 - / - - / - 0 / 0.000 1 / 0.497 FY 2028 - / - - / - - / - - / - - / - - / - - / - 0 / 1.523 3 / 0.000 - / - 0 / 0.000 3 / 1.523 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 1.037 2 / 0.000 0 / 0.000 2 / 1.037 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.529 1 / 0.360 1 / 0.889 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.360 1 / 0.360 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.360 1 / 0.360 Total 0 / 0.324 2 / 0.529 3 / 1.080 13 / 6.147 1 / 0.181 1 / 0.000 / - - 0 / 0.976 / - - 0 / 0.000 / - 0 / 0.976 2 / 0.497 1 / 1.523 3 / 1.037 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - 1 - - - - 1 - - - - - - - 2 - - - 1 - - - 3 - - - 2 - 3 13 Out - - 1 - - - - 1 - - - - - - - 2 - - - 1 - - - 3 - - - 2 - 3 13 Method of Implementation: TBD:: Installation Name: CARRIER NAVY ECDIS SOFTWARE Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 7 / 0.187 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 7 / 0.187 FY 2025 - / - 2 / 0.119 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 0.119 FY 2026 - / - - / - 2 / 0.122 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 0.122 FY 2027 - / - - / - - / - 2 / 0.125 0 / 0.000 2 / 0.125 - / - - / - - / - - / - 0 / 0.000 2 / 0.125 FY 2028 - / - - / - - / - - / - - / - - / - 1 / 0.064 - / - - / - - / - 0 / 0.000 1 / 0.064 FY 2029 - / - - / - - / - - / - - / - - / - - / - 3 / 0.195 - / - - / - 0 / 0.000 3 / 0.195 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.133 - / - 0 / 0.000 2 / 0.133 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.135 0 / 0.000 2 / 0.135 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.138 2 / 0.138 Total 7 / 0.187 2 / 0.135 2 / 0.138 23 / 1.218 LI 0670 - Other Navigation Equipment Navy 2 / 0.119 2 / 0.122 2 / 0.125 0 / 0.000 UNCLASSIFIED Page 26 of 64 2 / 0.125 1 / 0.064 3 / 0.195 P-1 Line #3 2 / 0.133 Volume 1 - 50 === page 129 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / GW056: NAVY ECDIS MDAP/MAIS Code: Modification Item 2 of 2: NAVY ECDIS PROCUREMENT Installation Information Method of Implementation: TBD:: Installation Name: CARRIER NAVY ECDIS SOFTWARE Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 7 - 2 - - - 2 - - - 2 - - - 1 - - - 3 - - - 2 - - - 2 - - 2 23 Out 7 - 2 - - - 2 - - - 2 - - - 1 - - - 3 - - - 2 - - - 2 - - 2 23 Method of Implementation (Organic): NAVY ECDIS SOFTWARE PRODUCTION - Not Installed Installation Quantity: 0 Footnotes: (67) NAVY ECDIS HARDWARE: Navy ECDIS Hardware funds are required for the procurement of a next generation Scalable Integrated Bridge System (SIBS) design as well as a new SIBS design based on DDG-class Integrated Bridge Navigation System (IBNS) for surface ships and land-based facilities. Costs reflected in exhibit 1.1.2 are not for procurement of actual Navy ECDIS HW but to fund associated activities for the procurement. (68) NAVY ECDIS SOFTWARE PRODUCTION: Funding is for initial Navy ECDIS software production build and follow-on Navy ECDIS software builds on a two-year cycle. Costs increase from FY26 to FY27 due to inflation. (69) (70) AMPHIB NAVY ECDIS HARDWARE: Procurement cost decrease from FY2026 to FY2027 due to no planned procurements of Navy ECDIS HW (SIBS GEN3). AMPHIB NAVY ECDIS SOFTWARE: Quantity reflects number of hulls to be upgraded. Planned bulk license procurement as part of Navy ECDIS Software Production costs and are outlined in (CE 2.1.1). Governments owns the Navy ECDIS SW license, and therefore, there's no separate procurement cost for Navy ECDIS SW. Navy ECDIS software has no production lead-time. (71) (72) SURFACE NAVY ECDIS HARDWARE: Procurement cost decrease from FY 2026 to FY 2027 is due to one planned procurement of Navy ECDIS HW (SIBS GEN3). SURFACE NAVY ECDIS SOFTWARE: Quantity reflects number of hulls to be upgraded. Planned bulk license procurement as part of Navy ECDIS Software Production costs and are outlined in (CE 2.1.1). Governments owns the Navy ECDIS SW license, and therefore, there's no separate procurement cost for Navy ECDIS SW. Navy ECDIS software has no production lead-time. (73) (74) CARRIER NAVY ECDIS HARDWARE: Procurement cost decrease from FY26 to FY27 is due to the procurement of one Navy ECDIS HW (SIBS GEN3). CARRIER NAVY ECDIS SOFTWARE: Quantity reflects number of hulls to be upgraded. Planned bulk license procurement as part of Navy ECDIS Software Production costs and are outlined in (CE 2.1.1). Governments owns the Navy ECDIS SW license, and therefore, there's no separate procurement cost for Navy ECDIS SW. Navy ECDIS software has no production lead-time. (75) (76) SUBMARINE NAVY ECDIS SOFTWARE SUSTAINMENT: This line item addresses funding requirements for "submarine specific" navigation and ISEA efforts. CARRIER NAVY ECDIS SOFTWARE: Starting in FY25 contract date has moved to March of each FY. There is no contract delay. Contract award and delivery timeline was shifted to better align with the latest installation plan. (77) CARRIER NAVY ECDIS HARDWARE: Procurement of SIBS GEN3 hardware suite to started in FY24 with installation funding required 18 months prior to installations due to AIT contract lead time. SIBS GEN3 hardware suite and prior configurations lead time is 12 months. There's no contract delay. Contract award and delivery timeline was shifted to better align with the latest installation plan. (78) AMPHIB NAVY ECDIS SOFTWARE INSTALLATION: Starting in FY25 contract date has moved to March of each FY. There is no contract delay. Contract award and delivery timeline was shifted to better align with the latest installation plan. LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 27 of 64 P-1 Line #3 Volume 1 - 51 === page 130 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 P-1 Line Item Number / Title: 0670 / Other Navigation Equipment ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / GW056: NAVY ECDIS MDAP/MAIS Code: (79) SURFACE NAVY ECDIS HARDWARE: Procurement of SIBS GEN3 hardware suite to start in FY24 with installation funding required 18 months prior to installations due to AIT contract lead time. SIBS GEN3 hardware suite and prior configurations lead time is 12 months. Starting in FY26, a 24-month production lead time is required as a result to a new Navy ECDIS HW (NAV C1) that will be procured and fielded. (80) SURFACE NAVY ECDIS SOFTWARE INSTALLATION: Starting in FY25 contract date has moved to March of each FY. There is no contract delay. Contract award and delivery timeline was shifted to better align with the latest installation plan. (81) AMPHIB NAVY ECDIS HARDWARE INSTALLATION: Starting in FY25, a 24-month production lead time is in effect due to a new Navy ECDIS HW (SIBS GEN3) that will be procured and fielded. Install funding required one year prior to planned installations. FY26 install funding covers three installs in FY27. LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 28 of 64 P-1 Line #3 Volume 1 - 52 === page 131 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 P-1 Line Item Number / Title: 0670 / Other Navigation Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 3 / GW061: MK 27 REPLACEMENT MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 3.160 0.332 0.169 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.661 Total - - - - - - - - - - - - 3.160 0.332 0.169 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.661 - - - - - - - - - - - - 3.160 0.332 0.169 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 3.661 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: These funds are required for the installation of AN/WSN-11 replacement for legacy MK27 Backup Heading Reference systems on amphibs. LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 29 of 64 P-1 Line #3 Volume 1 - 53 === page 132 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / GW061: MK 27 REPLACEMENT MDAP/MAIS Code: Models of Systems Affected: GW061: MK 27 REPLACEMENT Modification Type: MK 27 REPLACEMENT Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: GW061: MK 27 REPLACEMENT B Kits Recurring 1.1.1) AMPHIB AN/WSN-11 - NonOrganic (82) Subtotal: Recurring Subtotal: GW061: MK 27 REPLACEMENT Subtotal: Procurement, All Modification Items 14 / 1.942 - / 1.942 - 14 / 1.942 1 / 0.166 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 0.166 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.166 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 - / 2.108 / 0.000 - / 0.000 - / 1.553 / - - / 0.000 - / 1.553 - / 1.942 - / 0.166 Modification Item 1 of 1: GW061: MK 27 REPLACEMENT - / 1.218 - / 0.166 - / 0.169 Subtotal: Installation - / 1.218 - / 0.166 - / 0.169 / 0.000 15 / 2.108 - / - - / 2.108 15 / 2.108 Installation - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 0670 - Other Navigation Equipment Navy 3.160 0.332 0.169 0.000 0.000 UNCLASSIFIED Page 30 of 64 0.000 0.000 0.000 P-1 Line #3 0.000 0.000 0.000 3.661 Volume 1 - 54 === page 133 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / GW061: MK 27 REPLACEMENT MDAP/MAIS Code: Modification Item 1 of 1: GW061: MK 27 REPLACEMENT Manufacturer Information Manufacturer Name: WR Systems (Amphib WSN-11) Manufacturer Location: Norfolk, VA (83) Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 9 Dates FY 2025 Contract Dates Jan 2025 Delivery Dates Oct 2025 FY 2026 FY 2027 FY 2028 Manufacturer Name: WR Systems (Sub WSN-11) FY 2030 FY 2031 FY 2030 FY 2031 FY 2030 FY 2031 Manufacturer Location: Norfolk, VA Administrative Leadtime (in Months): 3 Dates FY 2029 Production Leadtime (in Months): 6 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Delivery Dates Manufacturer Name: WR Systems (Surf WSN-11) Manufacturer Location: Norfolk, VA Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 9 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Delivery Dates Installation Information Method of Implementation: AIT:: Installation Name: AMPHIB AN/WSN-11 Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 13 / 1.218 Prior Years 1 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 14 / 1.218 FY 2025 - / - 0 / 0.166 1 / 0.169 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 0.335 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.169 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total LI 0670 - Other Navigation Equipment Navy 13 / 1.218 1 / 0.166 UNCLASSIFIED Page 31 of 64 P-1 Line #3 15 / 1.553 Volume 1 - 55 === page 134 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / GW061: MK 27 REPLACEMENT MDAP/MAIS Code: Modification Item 1 of 1: GW061: MK 27 REPLACEMENT Installation Information Method of Implementation: AIT:: Installation Name: AMPHIB AN/WSN-11 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 13 1 - - - 1 - - - - - - - - - - - - - - - - - - - - - - - - 15 Out 13 1 - - - 1 - - - - - - - - - - - - - - - - - - - - - - - - 15 Footnotes: (82) (83) AMPHIB AN/WSN-11: Production Lead Time (PLT) increased from 6 months to 9 months to accommodate future industrial base lead times. Install funding required one year prior to planned installations. FY25 install funding covers 1 install in FY26. LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 32 of 64 P-1 Line #3 Volume 1 - 56 === page 135 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 P-1 Line Item Number / Title: 0670 / Other Navigation Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 4 / GW062: AN/WSN-7 MODERNIZATION MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 38.849 6.780 6.068 6.076 0.000 6.076 5.495 5.239 5.347 - - - - - - - - - 38.849 6.780 6.068 6.076 0.000 6.076 5.495 5.239 5.347 - - - - - - - - - 38.849 6.780 6.068 6.076 0.000 6.076 5.495 5.239 5.347 To FY 2031 Complete 5.461 Continuing - Continuing - 5.461 Continuing - Total - Continuing - - 5.461 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: These funds are required for the procurement and installation of field changes, upgrades, and Tech Refresh of AN/WSN-7 Inertial Navigation System on surface ships and submarines. Field Change 28 / Technical Insertion (TI-22): GPS Enhancements Field Change 30: Amphib- Field change removes existing equipment in conjunction with other field changes. Therefore, there's no separate costs associated with FC30. Surface - Removes excess NTDS-A Circuit Card Assemblies (CCAs) from Surface Cabinets for use in new production units. Submarine Engineering Change Instruction (ECI): Technical Insertion/ APB updates Submarine Field Change 29(TI-24 A/F): Removes the existing Tactical Navigation (TACNAV) Hardware (H/W) and installs TI24 TACNAV H/W that is required to support APB-23/25 LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 33 of 64 P-1 Line #3 Volume 1 - 57 === page 136 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: GW062: AN/WSN-7 MODERNIZATION Prior Years Financial Plan Modification Number / Title: 4 / GW062: AN/WSN-7 MODERNIZATION Modification Type: AN/WSN-7 MODERNIZATION FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 3: AMPHIB FIELD CHANGES B Kits Recurring 1.1.1) AMPHIB AN/WSN-7 FIELD CHANGE 27 NonOrganic 30 / 3.905 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 30 / 3.905 1.1.2) AMPHIB AN/WSN-7 FIELD CHANGE 30 - 9 / 0.000 3 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - 12 / 0.000 NonOrganic (84) Subtotal: Recurring / - - / - - / - - / - - / - - / - - / - - / - - / - 39 / 3.905 3 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - 39 / 0.000 9 / 0.000 3 / 0.000 3 / 0.000 - / - 3 / 0.000 3 / 0.000 3 / 0.000 3 / 0.000 95 / 12.833 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Subtotal: AMPHIB FIELD CHANGES / 3.905 - / 0.000 - - / 3.905 / - 42 / 3.905 3 / 0.000 3 / 0.000 69 / 0.000 - / - - 95 / 12.833 - / - - Modification Item 2 of 3: SURFACE FIELD CHANGES B Kits Recurring 2.1.1) SURFACE AN/WSN-7 FIELD CHANGE 30 NonOrganic (85) 2.1.2) SURFACE AN/WSN-7 FIELD CHANGE 27 NonOrganic (86) Subtotal: Recurring - Subtotal: SURFACE FIELD CHANGES / 12.833 134 / 12.833 / - / - - / - - 9 / 0.000 3 / 0.000 3 / 0.000 - / - 3 / 0.000 3 / 0.000 3 / 0.000 3 / 0.000 3 / 0.000 3 / 0.000 / 0.000 - - / 12.833 164 / 12.833 Modification Item 3 of 3: SUBMARINE FIELD CHANGES B Kits Recurring 3.1.1) SUBMARINE SHIPALT 4507 - Organic 1 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.000 3.1.2) SUBMARINE AN/WSN-7A FIELD CHANGE 28 19 / 6.011 1 / 0.369 - / - - / - - / - - / - - / - - / - - / - - / - - / - 20 / 6.380 3.1.3) SUBMARINE AN/WSN-7 ECI (TI-16/APB-15) NonOrganic 2 / 0.000 - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.000 3.1.4) SUBMARINE AN/WSN-7A ECI (TI/APB updates) 41 / 1.449 18 / 0.655 20 / 0.743 18 / 0.682 - / - 8 / 3.038 8 / 3.121 5 / 1.990 - / - (TI-22) - NonOrganic - NonOrganic (87) (88) 3.1.6) SUBMARINE AN/WSN-7A FC 29 (TI-24) NonOrganic (89) LI 0670 - Other Navigation Equipment Navy / - - / - UNCLASSIFIED Page 34 of 64 18 / 0.682 - / - 18 / 0.696 - / - 18 / 0.710 - / - P-1 Line #3 18 / 0.724 - / - 18 / 0.740 - / - Continuing - / - Continuing 21 / 8.149 Volume 1 - 58 === page 137 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: GW062: AN/WSN-7 MODERNIZATION Prior Years Financial Plan Subtotal: Recurring Subtotal: Procurement, All Modification Items Modification Type: AN/WSN-7 MODERNIZATION FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) 3.1.7) SUBMARINE AN/WSN-7A FC TBD (TI-26) NonOrganic Subtotal: SUBMARINE FIELD CHANGES Modification Number / Title: 4 / GW062: AN/WSN-7 MODERNIZATION - / - / 10.498 - 71 / 10.498 - 1 / 0.416 - / 4.561 28 / 4.561 2 / 0.849 - / 3.582 27 / 3.582 8 / 3.464 - / - 8 / 3.464 - / - - - / - 26 / 4.146 - / - - / 4.146 - / 3.346 - / 3.413 - / 3.484 / 27.236 - / 4.561 - / 3.582 - / 4.146 24 / 3.346 - / 3.413 6 / 2.760 / 4.146 - / 3.346 6 / 2.703 26 / 4.146 - / 4.146 6 / 2.650 24 / 3.413 - / 3.484 24 / 3.484 6 / 2.818 Continuing Continuing / 3.558 Continuing Continuing 24 / 3.558 Continuing Continuing - / 3.558 Continuing Continuing - Installation Modification Item 1 of 3: AMPHIB FIELD CHANGES - / 1.212 - / 0.129 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - Modification Item 2 of 3: SURFACE FIELD CHANGES - / 5.458 - / 0.078 - / 0.013 - / 0.013 - / 0.000 - / 0.013 - / 0.013 - / 0.014 - / 0.014 - / 0.014 - / 0.014 - Modification Item 3 of 3: SUBMARINE FIELD CHANGES - / 4.943 - / 2.012 - / 2.473 - / 1.917 - / 0.000 - / 1.917 - / 2.136 - / 1.812 - / 1.849 - / 1.889 - / 1.173 - / 20.204 / 11.613 - / 2.219 - / 2.486 - / 1.930 / - - / 1.930 - / 2.149 - / 1.826 - / 1.863 - / 1.903 - / 1.187 - / 27.176 5.461 Continuing Subtotal: Installation - - / 1.341 / 5.631 Total Total Cost (Procurement + Support + Installation) LI 0670 - Other Navigation Equipment Navy 38.849 6.780 6.068 6.076 0.000 UNCLASSIFIED Page 35 of 64 6.076 5.495 5.239 P-1 Line #3 5.347 Continuing Volume 1 - 59 === page 138 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / GW062: AN/WSN-7 MODERNIZATION MDAP/MAIS Code: Modification Item 1 of 3: AMPHIB FIELD CHANGES Manufacturer Information Manufacturer Name: WR Systems (Amphib WSN-7 FIELD CHANGE 27) Manufacturer Location: Norfolk, VA Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 6 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2030 FY 2031 Contract Dates Delivery Dates Manufacturer Name: N/A (Amphib WSN-7 FC30) Manufacturer Location: N/A Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 0 Dates FY 2025 Contract Dates Jan 2025 Delivery Dates Jan 2025 FY 2026 FY 2027 FY 2028 FY 2029 Installation Information Method of Implementation: AIT:: Installation Name: AMPHIB AN/WSN-7 FIELD CHANGE 27 Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 27 / 1.174 30 / 1.290 Prior Years 3 / 0.116 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 0.116 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total LI 0670 - Other Navigation Equipment Navy 27 / 1.174 UNCLASSIFIED Page 36 of 64 P-1 Line #3 30 / 1.290 Volume 1 - 60 === page 139 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / GW062: AN/WSN-7 MODERNIZATION MDAP/MAIS Code: Modification Item 1 of 3: AMPHIB FIELD CHANGES Installation Information Method of Implementation: AIT:: Installation Name: AMPHIB AN/WSN-7 FIELD CHANGE 27 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 27 - - - 3 - - - - - - - - - - - - - - - - - - - - - - - - - 30 Out 27 - - - 3 - - - - - - - - - - - - - - - - - - - - - - - - - 30 Method of Implementation: [none specified]:: Installation Name: AMPHIB AN/WSN-7 FIELD CHANGE 30 Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 9 / 0.038 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 9 / 0.038 FY 2025 - / - 3 / 0.013 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 3 / 0.013 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 9 / 0.038 3 / 0.013 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 12 / 0.051 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 9 - 3 - - - - - - - - - - - - - - - - - - - - - - - - - - - 12 Out 9 - 3 - - - - - - - - - - - - - - - - - - - - - - - - - - - 12 LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 37 of 64 P-1 Line #3 Volume 1 - 61 === page 140 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / GW062: AN/WSN-7 MODERNIZATION MDAP/MAIS Code: Modification Item 2 of 3: SURFACE FIELD CHANGES Manufacturer Information Manufacturer Name: N/A (Surface WSN-7 FC30) Manufacturer Location: N/A Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 0 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 FY 2030 FY 2031 Manufacturer Name: WR Systems (Surf WSN-7 FC 27) Manufacturer Location: Norfolk, VA Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 6 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Delivery Dates Installation Information Method of Implementation: AIT:: Installation Name: SURFACE AN/WSN-7 FIELD CHANGE 30 Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - Prior Years / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 39 / 0.161 FY 2025 - / - 9 / 0.038 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 9 / 0.038 FY 2026 - / - - / - 3 / 0.013 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 3 / 0.013 FY 2027 - / - - / - - / - 3 / 0.013 0 / 0.000 3 / 0.013 - / - - / - - / - - / - 0 / 0.000 3 / 0.013 FY 2028 - / - - / - - / - - / - - / - - / - 3 / 0.013 - / - - / - - / - 0 / 0.000 3 / 0.013 FY 2029 - / - - / - - / - - / - - / - - / - - / - 3 / 0.014 - / - - / - 0 / 0.000 3 / 0.014 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 3 / 0.014 - / - 0 / 0.000 3 / 0.014 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 0.014 0 / 0.000 3 / 0.014 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 0.014 3 / 0.014 3 / 0.014 3 / 0.014 69 / 0.294 Total LI 0670 - Other Navigation Equipment Navy 39 / 0.161 39 / 0.161 9 / 0.038 3 / 0.013 3 / 0.013 0 / 0.000 UNCLASSIFIED Page 38 of 64 3 / 0.013 3 / 0.013 3 / 0.014 P-1 Line #3 3 / 0.014 Volume 1 - 62 === page 141 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / GW062: AN/WSN-7 MODERNIZATION MDAP/MAIS Code: Modification Item 2 of 3: SURFACE FIELD CHANGES Installation Information Method of Implementation: AIT:: Installation Name: SURFACE AN/WSN-7 FIELD CHANGE 30 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 39 - 9 - - - 3 - - - 3 - - - 3 - - - 3 - - - 3 - - - 3 - - 3 69 Out 39 - 9 - - - 3 - - - 3 - - - 3 - - - 3 - - - 3 - - - 3 - - 3 69 Method of Implementation: AIT:: Installation Name: SURFACE AN/WSN-7 FIELD CHANGE 27 Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 94 / 5.297 95 / 5.337 Prior Years 1 / 0.040 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.040 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 94 / 5.297 95 / 5.337 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 94 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - 95 Out 94 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - 95 LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 39 of 64 P-1 Line #3 Volume 1 - 63 === page 142 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 P-1 Line Item Number / Title: 0670 / Other Navigation Equipment ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / GW062: AN/WSN-7 MODERNIZATION MDAP/MAIS Code: Modification Item 3 of 3: SUBMARINE FIELD CHANGES Manufacturer Information Manufacturer Name: WR SYSTEMS (Sub WSN-7 FC TBD TI-26) Manufacturer Location: NORFOLK, VA Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 9 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Oct 2025 Oct 2026 Oct 2027 Oct 2028 Oct 2029 Oct 2030 Oct 2031 Manufacturer Name: WR SYSTEMS (Sub WSN-7 ECI) Manufacturer Location: NORFOLK, VA Administrative Leadtime (in Months): 8 Production Leadtime (in Months): 4 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jun 2025 Jun 2026 Jun 2027 Jun 2028 Jun 2029 Jun 2030 Jun 2031 Delivery Dates Oct 2025 Oct 2026 Oct 2027 Oct 2028 Oct 2029 Oct 2030 Oct 2031 FY 2030 FY 2031 FY 2030 FY 2031 FY 2030 FY 2031 Manufacturer Name: WR SYSTEMS (Sub WSN-7 FC TBD TI-24) Manufacturer Location: NORFOLK, VA Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 9 Dates FY 2025 FY 2026 Contract Dates Jan 2025 Jan 2026 Delivery Dates Oct 2025 Oct 2026 FY 2027 FY 2028 FY 2029 Manufacturer Name: WR SYSTEMS (Sub WSN-7 FC28) Manufacturer Location: NORFOLK, VA Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 9 Dates FY 2025 Contract Dates Jan 2025 Delivery Dates Oct 2025 FY 2026 FY 2027 Manufacturer Name: WR Systems (Sub WSN-7 ECI TI-16/APB-15) FY 2025 FY 2029 Manufacturer Location: Norfolk, VA Administrative Leadtime (in Months): 3 Dates FY 2028 Production Leadtime (in Months): 3 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Delivery Dates LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 40 of 64 P-1 Line #3 Volume 1 - 64 === page 143 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / GW062: AN/WSN-7 MODERNIZATION MDAP/MAIS Code: Modification Item 3 of 3: SUBMARINE FIELD CHANGES Installation Information Method of Implementation: AIT:: Installation Name: SUBMARINE AN/WSN-7A FIELD CHANGE 28 (TI-22) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 16 / 2.624 Prior Years 3 / 0.509 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 19 / 3.133 FY 2025 - / - - / - 1 / 0.173 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 0.173 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.173 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 16 / 2.624 3 / 0.509 20 / 3.306 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 16 3 - - - 1 - - - - - - - - - - - - - - - - - - - - - - - - 20 Out 16 3 - - - 1 - - - - - - - - - - - - - - - - - - - - - - - - 20 Method of Implementation: AIT:: Installation Name: SUBMARINE AN/WSN-7 ECI (TI-16/APB-15) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 2 / 0.326 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 0.326 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 41 of 64 P-1 Line #3 Volume 1 - 65 === page 144 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / GW062: AN/WSN-7 MODERNIZATION MDAP/MAIS Code: Modification Item 3 of 3: SUBMARINE FIELD CHANGES Installation Information Method of Implementation: AIT:: Installation Name: SUBMARINE AN/WSN-7 ECI (TI-16/APB-15) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total 2 / 0.326 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Installation Cost / - - / - 2 / 0.326 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 Out 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 Method of Implementation: AIT:: Installation Name: SUBMARINE AN/WSN-7A ECI (TI/APB updates) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 21 / 1.494 20 / 0.000 - Prior Years / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 41 / 1.494 FY 2025 - / - 0 / 0.655 18 / 0.000 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 18 / 0.655 FY 2026 - / - - / - 0 / 0.743 20 / 0.000 0 / 0.000 20 / 0.000 - / - - / - - / - - / - 0 / 0.000 20 / 0.743 FY 2027 - / - - / - - / - 0 / 0.682 0 / 0.000 0 / 0.682 18 / 0.000 - / - - / - - / - 0 / 0.000 18 / 0.682 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 0.696 18 / 0.000 - / - - / - 0 / 0.000 18 / 0.696 FY 2029 - / - - / - - / - - / - - / - - / - - / - 0 / 0.710 18 / 0.000 - / - 0 / 0.000 18 / 0.710 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.724 18 / 0.000 0 / 0.000 18 / 0.724 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.740 18 / 0.000 18 / 0.740 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 18 / 0.000 18 / - 18 / 0.740 36 / 0.000 187 / 6.444 Total LI 0670 - Other Navigation Equipment Navy 21 / 1.494 20 / 0.655 18 / 0.743 20 / 0.682 0 / 0.000 UNCLASSIFIED Page 42 of 64 20 / 0.682 18 / 0.696 18 / 0.710 P-1 Line #3 18 / 0.724 Volume 1 - 66 === page 145 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / GW062: AN/WSN-7 MODERNIZATION MDAP/MAIS Code: Modification Item 3 of 3: SUBMARINE FIELD CHANGES Installation Information Method of Implementation: AIT:: Installation Name: SUBMARINE AN/WSN-7A ECI (TI/APB updates) Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 21 20 - - - 18 - - - 20 - - - 18 - - - 18 - - - 18 - - - 18 - - - 36 187 Out 21 20 - - - 18 - - - 20 - - - 18 - - - 18 - - - 18 - - - 18 - - - 36 187 Method of Implementation: AIT:: Installation Name: SUBMARINE AN/WSN-7A FC 29 (TI-24) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 3 / 0.499 5 / 0.848 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 8 / 1.347 FY 2025 - / - - / - 8 / 1.384 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 8 / 1.384 FY 2026 - / - - / - - / - 5 / 0.882 0 / 0.000 5 / 0.882 - / - - / - - / - - / - 0 / 0.000 5 / 0.882 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 3 / 0.499 5 / 0.882 - / - - / - - / - - / - 0 / 0.000 Installation Cost 5 / 0.848 8 / 1.384 5 / 0.882 0 / 0.000 21 / 3.613 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 3 5 - - - 8 - - - 5 - - - - - - - - - - - - - - - - - - - - 21 Out 3 5 - - - 8 - - - 5 - - - - - - - - - - - - - - - - - - - - 21 LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 43 of 64 P-1 Line #3 Volume 1 - 67 === page 146 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / GW062: AN/WSN-7 MODERNIZATION MDAP/MAIS Code: Modification Item 3 of 3: SUBMARINE FIELD CHANGES Installation Information Method of Implementation: AIT:: Installation Name: SUBMARINE AN/WSN-7A FC TBD (TI-26) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - - / - 1 / 0.173 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 0.173 FY 2026 - / - - / - - / - 2 / 0.353 0 / 0.000 2 / 0.353 - / - - / - - / - - / - 0 / 0.000 2 / 0.353 FY 2027 - / - - / - - / - - / - - / - - / - 8 / 1.440 - / - - / - - / - 0 / 0.000 8 / 1.440 FY 2028 - / - - / - - / - - / - - / - - / - - / - 6 / 1.102 - / - - / - 0 / 0.000 6 / 1.102 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 6 / 1.125 - / - 0 / 0.000 6 / 1.125 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 6 / 1.149 0 / 0.000 6 / 1.149 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 6 / 1.173 6 / 1.173 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total - / - - / - 1 / 0.173 6 / 1.149 6 / 1.173 Installation Cost 2 / 0.353 0 / 0.000 2 / 0.353 8 / 1.440 6 / 1.102 6 / 1.125 / - - - / - / - 35 / 6.515 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - 1 - - - 2 - - - 8 - - - 6 - - - 6 - - - 6 6 35 Out - - - - - - - - 1 - - - 2 - - - 8 - - - 6 - - - 6 - - - 6 6 35 Method of Implementation (Organic): SUBMARINE SHIPALT 4507 Installation Quantity: 1 Footnotes: (84) (85) (86) (87) (88) (89) AMPHIB AN/WSN-7 FIELD CHANGE 30: AMPHIB- Field change removes existing equipment in conjunction with other field changes. Therefore, there's no separate costs associated with FC30. Field Change 30: Surface- Removes excess NTDS-A Circuit Card Assemblies (CCAs) from Surface Cabinets for use in new production units. Field Change 27: CDU Tech Refresh Field Change 28 / Technical Insertion (TI-22): GPS Enhancements Submarine Engineering Change Instruction (ECI): Technical Insertion/ APB updates. Submarine Field Change 29(TI-24 A/F): Removes the existing Tactical Navigation (TACNAV) Hardware (H/W) and installs TI24 TACNAV H/W that is required to support APB-23/25. LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 44 of 64 P-1 Line #3 Volume 1 - 68 === page 147 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 P-1 Line Item Number / Title: 0670 / Other Navigation Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 5 / GW070: MILITARY GLOBAL POSITIONING SYSTEM (GPS) USER EQUIPMENT (MGUE) MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 0.473 0.271 0.331 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.075 Total - - - - - - - - - - - - 0.473 0.271 0.331 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.075 - - - - - - - - - - - - 0.473 0.271 0.331 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.075 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: These funds are required for the procurement of Military GPS User Equipment on submarines. LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 45 of 64 P-1 Line #3 Volume 1 - 69 === page 148 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / GW070: MILITARY GLOBAL POSITIONING SYSTEM (GPS) USER EQUIPMENT (MGUE) MDAP/MAIS Code: Models of Systems Affected: GW070: MILITARY GPS USER EQUIPMENT Prior Years Related RDT&E PEs: 0607658N Modification Type: MILITARY GPS USER EQUIPMENT FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: GW070: MILITARY GLOBAL POSITIONING SYSTEM (GPS) USER EQUIPMENT (MGUE) B Kits Recurring 1.1.1) SUBMARINE MGUE - Organic (90) Subtotal: Recurring Subtotal: GW070: MILITARY GLOBAL POSITIONING SYSTEM (GPS) USER EQUIPMENT (MGUE) Subtotal: Procurement, All Modification Items 18 / 0.473 / 0.473 - 18 / 0.473 / 0.473 - 10 / 0.271 / 0.271 - 10 / 0.271 / 0.271 - 12 / 0.331 - / - - / - - / - - / - - / - - / - - / - / 0.331 - / - - / - - / - - / - - / - - / - - / - 12 / 0.331 - / - - / - - / - - / - - / - - / - - / - / 0.331 - / - - / - - / - - / - - / - - / - - / - / - - / - - / - - / - - / - - / - - / - - / - - - - / / 0.000 - / / 0.000 - 40 / 1.075 / 1.075 - 40 / 1.075 / 1.075 - Installation Subtotal: Installation - / - - / - - - / - - / - Total Total Cost (Procurement + Support + Installation) LI 0670 - Other Navigation Equipment Navy 0.473 0.271 0.331 0.000 0.000 UNCLASSIFIED Page 46 of 64 0.000 0.000 0.000 P-1 Line #3 0.000 0.000 0.000 1.075 Volume 1 - 70 === page 149 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 P-1 Line Item Number / Title: 0670 / Other Navigation Equipment ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / GW070: MILITARY GLOBAL POSITIONING SYSTEM (GPS) USER EQUIPMENT (MGUE) MDAP/MAIS Code: Modification Item 1 of 1: GW070: MILITARY GLOBAL POSITIONING SYSTEM (GPS) USER EQUIPMENT (MGUE) Manufacturer Information Manufacturer Name: TBD (Sub MGUE) Manufacturer Location: TBD Administrative Leadtime (in Months): 3 Dates FY 2025 Contract Dates Jan 2025 Delivery Dates Jul 2025 Production Leadtime (in Months): 6 FY 2026 FY 2027 Manufacturer Name: TBD FY 2029 FY 2030 FY 2031 FY 2030 FY 2031 Manufacturer Location: TBD Administrative Leadtime (in Months): 0 Dates FY 2028 FY 2025 Production Leadtime (in Months): 0 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Delivery Dates Footnotes: (90) Procurement quantity increase from FY 2025 to FY 2026 is based on the system delivery requirements. This equipment is installed as part of (GW062) AN/WSN7A ECDU modernization, installation costs are reflected in TI22, TI24 and TI26. LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 47 of 64 P-1 Line #3 Volume 1 - 71 === page 150 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 P-1 Line Item Number / Title: 0670 / Other Navigation Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 6 / GW071: NAVIGATION NETWORKS MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 27.136 28.307 27.161 10.968 0.000 10.968 17.879 14.010 10.269 14.229 7.647 - - - - - - - - - - - 27.136 28.307 27.161 10.968 0.000 10.968 17.879 14.010 10.269 14.229 7.647 - - - - - - - - - - - 27.136 28.307 27.161 10.968 0.000 10.968 17.879 14.010 10.269 14.229 7.647 Total 157.606 157.606 157.606 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: GW071 title change from Navigation Critical Distribution System to Navigation Networks to incorporate NCDS and NDDS. These funds are required for the procurement and installation of Navigation Critical Distribution System (NCDS) and Navigation Data Distribution System (NDDS) on amphibious ships and carriers. LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 48 of 64 P-1 Line #3 Volume 1 - 72 === page 151 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / GW071: NAVIGATION NETWORKS MDAP/MAIS Code: Models of Systems Affected: GW071: NAVIGATION NETWORKS Prior Years Modification Type: GW071: NAVIGATION NETWORKS FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: GW071: NAVIGATION NETWORKS B Kits Recurring 1.1.1) AMPHIB Navigation Critical Distribution System (NCDS) Procurement - NonOrganic 5 / 13.584 1.1.2) CARRIER - Navigation Critical Distribution System (NCDS) Procurement - NonOrganic - (91) 1.1.3) AMPHIB Navigation Data Distribution System (NDDS) Procurement - NonOrganic 5 / 7.000 (92) Subtotal: Recurring Subtotal: GW071: NAVIGATION NETWORKS Subtotal: Procurement, All Modification Items / - / 20.584 - - 10 / 20.584 - 4 / 11.946 2 / 6.092 2 / 6.214 - / - 2 / 6.214 3 / 9.508 1 / 3.233 2 / 6.601 2 / 6.740 - / - 21 / 63.918 2 / 3.086 2 / 3.148 - / - - / - - / - - / - - / - - / - - / - - / - 4 / 6.234 - - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 7.000 / - / 15.032 - 6 / 15.032 / 20.584 - / 15.032 / / 9.240 - 4 / 9.240 - / 6.214 - / - 2 / 6.214 - / - - / - - / 6.214 - / 9.508 / 0.000 - / 4.754 - / 8.371 / - - / 4.754 - / 8.371 / 9.240 - / 6.214 - / 6.214 - 2 / 6.214 / 9.508 - 3 / 9.508 / 3.233 - 1 / 3.233 / 6.601 - 2 / 6.601 / 6.740 / 0.000 - 2 / 6.740 - / - - / 77.152 30 / 77.152 / 3.233 - / 6.601 - / 6.740 - / 0.000 - / 77.152 - / 10.777 - / 3.668 - / 7.489 - / 7.647 - / 80.454 - / 10.777 - / 3.668 - / 7.489 - / 7.647 - / 80.454 - Installation Modification Item 1 of 1: GW071: NAVIGATION NETWORKS - / 6.552 - / 13.275 - / 17.921 - / 4.754 Subtotal: Installation - / 6.552 - / 13.275 - / 17.921 - / 4.754 - Total Total Cost (Procurement + Support + Installation) LI 0670 - Other Navigation Equipment Navy 27.136 28.307 27.161 10.968 0.000 UNCLASSIFIED Page 49 of 64 10.968 17.879 14.010 P-1 Line #3 10.269 14.229 7.647 157.606 Volume 1 - 73 === page 152 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / GW071: NAVIGATION NETWORKS MDAP/MAIS Code: Modification Item 1 of 1: GW071: NAVIGATION NETWORKS Manufacturer Information Manufacturer Name: Multiple NDDS Vendors Manufacturer Location: Multiple (93) Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 Contract Dates Jun 2025 Jun 2026 Delivery Dates Jun 2026 Manufacturer Name: Multiple NCDS Vendors FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Jun 2027 Manufacturer Location: Multiple (94) Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 24 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Jan 2032 Jan 2033 FY 2030 FY 2031 Manufacturer Name: Multiple Vendors Manufacturer Location: Multiple Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 24 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Delivery Dates Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Installation Information Method of Implementation: AIT:: Installation Name: AMPHIB Navigation Critical Distribution System (NCDS) Procurement Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 1 / 6.552 1 / 9.956 3 / 0.000 - - / - - / - - / - - / - - / - 0 / 0.000 5 / 16.508 FY 2025 - / - 0 / 3.319 1 / 8.650 3 / 0.000 0 / 0.000 3 / 0.000 - / - - / - - / - - / - 0 / 0.000 4 / 11.969 FY 2026 - / - - / - 0 / 4.890 1 / 3.453 0 / 0.000 1 / 3.453 1 / 0.000 - / - - / - - / - 0 / 0.000 2 / 8.343 FY 2027 - / - - / - - / - - / - - / - - / - 0 / 7.044 2 / 0.000 - / - - / - 0 / 0.000 2 / 7.044 FY 2028 - / - - / - - / - - / - - / - - / - - / - 0 / 10.777 3 / 0.000 - / - 0 / 0.000 3 / 10.777 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 3.668 1 / 0.000 0 / 0.000 1 / 3.668 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 7.489 2 / 0.000 2 / 7.489 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 7.647 2 / 7.647 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total 1 / 6.552 Installation Cost LI 0670 - Other Navigation Equipment Navy 1 / 13.275 4 / 13.540 / - - 4 / 3.453 / - 0 / 0.000 UNCLASSIFIED Page 50 of 64 4 / 3.453 1 / 7.044 2 / 10.777 P-1 Line #3 3 / 3.668 1 / 7.489 / - 4 / 7.647 - / - 21 / 73.445 Volume 1 - 74 === page 153 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / GW071: NAVIGATION NETWORKS MDAP/MAIS Code: Modification Item 1 of 1: GW071: NAVIGATION NETWORKS Installation Information Method of Implementation: AIT:: Installation Name: AMPHIB Navigation Critical Distribution System (NCDS) Procurement Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 1 - - - 1 3 - - 1 - 3 - 1 - - - 1 - - - 2 - - - 3 - - - 1 4 21 Out 1 - - - 1 3 - - 1 - 3 - 1 - - - 1 - - - 2 - - - 3 - - - 1 4 21 Method of Implementation: AIT:: Installation Name: CARRIER - Navigation Critical Distribution System (NCDS) Procurement Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - - / - - / - - / - - / - - / - - FY 2025 - / - - / - - / - 2 / 1.301 0 / 0.000 2 / 1.301 - / - - / - - / - - / - 0 / 0.000 2 / 1.301 FY 2026 - / - - / - - / - - / - - / - - / - 2 / 1.327 - / - - / - - / - 0 / 0.000 2 / 1.327 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - 2 / 1.301 2 / 1.327 - / - - / - - / - 0 / 0.000 Installation Cost / - - / - 0 / 0.000 2 / 1.301 / - - / - 4 / 2.628 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - 2 - - - 2 - - - - - - - - - - - - - - - 4 Out - - - - - - - - - - 2 - - - 2 - - - - - - - - - - - - - - - 4 Method of Implementation: AIT:: Installation Name: AMPHIB Navigation Data Distribution System (NDDS) Procurement Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 3 / 0.000 2 / 4.381 - - - - - - - 0 / 0.000 5 / 4.381 Prior Years LI 0670 - Other Navigation Equipment Navy - / - / - / - UNCLASSIFIED Page 51 of 64 / - / - / - P-1 Line #3 / - / - Volume 1 - 75 === page 154 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / GW071: NAVIGATION NETWORKS MDAP/MAIS Code: Modification Item 1 of 1: GW071: NAVIGATION NETWORKS Installation Information Method of Implementation: AIT:: Installation Name: AMPHIB Navigation Data Distribution System (NDDS) Procurement Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - 3 / 0.000 2 / 4.381 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Installation Cost 5 / 4.381 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - 3 - - - 2 - - - - - - - - - - - - - - - - - - - - - 5 Out - - - - 3 - - - 2 - - - - - - - - - - - - - - - - - - - - - 5 Footnotes: (91) This is not a new start. This Cost Element was created to reflect funding and program responsibility transferal due to centralization of Program Acquisition Resource Manager (PARM) for navigation systems starting in FY25. (92) For installations, funding is required one year in advance due to AIT contract lead-time. NDDS manufacturers: Lyme Computing Solutions for Siemens, Raytheon (San Diego, CA), and Brandywine (California). (93) (94) Production Lead Time (PLT) is 12 months, install funding required at least one year prior to planned installations. FY24 install funding covers three installs in FY25 and two installs in FY26. Production Lead Time (PLT) increased to 24 months in FY25 and beyond based on longer material lead times. Install funding required one year prior to planned installations. FY27 funding is required for planned installs in FY28. There are four planned installs in FY27 and one in FY28. LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 52 of 64 P-1 Line #3 Volume 1 - 76 === page 155 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 P-1 Line Item Number / Title: 0670 / Other Navigation Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 7 / GW072: AUTOMATED CELESTIAL NAVIGATION SYSTEM MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 15.667 8.247 9.759 10.591 0.000 10.591 10.803 11.019 11.251 11.486 2.820 91.643 Total - - - - - - - - - - - - 15.667 8.247 9.759 10.591 0.000 10.591 10.803 11.019 11.251 11.486 2.820 91.643 - - - - - - - - - - - - 15.667 8.247 9.759 10.591 0.000 10.591 10.803 11.019 11.251 11.486 2.820 91.643 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: These funds are required for the procurement and installation of Automated Celestial Navigation System (ACNS) on surface ships. LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 53 of 64 P-1 Line #3 Volume 1 - 77 === page 156 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 7 / GW072: AUTOMATED CELESTIAL NAVIGATION SYSTEM MDAP/MAIS Code: Models of Systems Affected: GW072: AUTOMATED CELESTIAL NAVIGATION SYSTEM Prior Years Modification Type: GW072: AUTOMATED CELESTIAL NAVIGATION SYSTEM FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: GW072: AUTOMATED CELESTIAL NAVIGATION SYSTEM B Kits Recurring 1.1.1) SURFACE ACNS - NonOrganic 8 / 14.835 (95) Subtotal: Recurring Subtotal: Procurement, All Modification Items / 14.835 - Subtotal: GW072: AUTOMATED CELESTIAL NAVIGATION SYSTEM 3 / 5.799 - 8 / 14.835 - / 5.799 4 / 7.886 - 3 / 5.799 / 7.886 - 4 / 7.886 4 / 8.044 - / - 4 / 8.044 / - / - - / - - / 8.044 - / 8.205 - / 8.369 - / 8.545 - / 8.724 - / 0.000 - / 70.407 / 0.000 - / 2.547 - / 2.598 - / 2.650 - / 2.706 - / 2.762 - / 2.820 - / 21.236 / - - / 2.547 - / 2.598 - / 2.650 - / 2.706 - / 2.762 - / 2.820 - / 21.236 / 14.835 - / 5.799 - / 7.886 - / 8.044 - 4 / 8.369 - 4 / 8.545 / 0.000 35 / 70.407 / - - / 8.724 - - 4 / 8.205 / 8.545 4 / 8.724 - - / 8.369 4 / 8.545 / 8.044 4 / 8.044 / 8.205 4 / 8.369 4 / 8.044 - / 8.044 4 / 8.205 - 4 / 8.724 - / - - / 70.407 35 / 70.407 Installation Modification Item 1 of 1: GW072: AUTOMATED CELESTIAL NAVIGATION SYSTEM - / 0.832 - / 2.448 - / 1.873 - / 2.547 Subtotal: Installation - / 0.832 - / 2.448 - / 1.873 - / 2.547 - Total Total Cost (Procurement + Support + Installation) LI 0670 - Other Navigation Equipment Navy 15.667 8.247 9.759 10.591 0.000 UNCLASSIFIED Page 54 of 64 10.591 10.803 11.019 P-1 Line #3 11.251 11.486 2.820 91.643 Volume 1 - 78 === page 157 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 7 / GW072: AUTOMATED CELESTIAL NAVIGATION SYSTEM MDAP/MAIS Code: Modification Item 1 of 1: GW072: AUTOMATED CELESTIAL NAVIGATION SYSTEM Manufacturer Information Manufacturer Name: Multiple Vendors Manufacturer Location: Multiple Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Jan 2032 Installation Information Method of Implementation: TBD:: Installation Name: SURFACE ACNS Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 4 / 0.832 4 / 2.448 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 8 / 3.280 FY 2025 - / - - / - 3 / 1.873 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 3 / 1.873 FY 2026 - / - - / - - / - 4 / 2.547 0 / 0.000 4 / 2.547 - / - - / - - / - - / - 0 / 0.000 4 / 2.547 FY 2027 - / - - / - - / - - / - - / - - / - 4 / 2.598 - / - - / - - / - 0 / 0.000 4 / 2.598 FY 2028 - / - - / - - / - - / - - / - - / - - / - 4 / 2.650 - / - - / - 0 / 0.000 4 / 2.650 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 4 / 2.706 - / - 0 / 0.000 4 / 2.706 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 2.762 0 / 0.000 4 / 2.762 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 2.820 4 / 2.820 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total 4 / 0.832 Installation Cost 4 / 2.448 3 / 1.873 4 / 2.547 0 / 0.000 4 / 2.547 4 / 2.598 4 / 2.650 4 / 2.706 4 / 2.762 / - 4 / 2.820 - / - 35 / 21.236 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 4 - 4 - - - 3 - - - 4 - - - 4 - - - 4 - - - 4 - - - 4 - - 4 35 Out 4 - 4 - - - 3 - - - 4 - - - 4 - - - 4 - - - 4 - - - 4 - - 4 35 Footnotes: (95) In FY 2027 Unit cost increased due to updated material costs from vendor as a result of higher-than-normal inflation. LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 55 of 64 P-1 Line #3 Volume 1 - 79 === page 158 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 P-1 Line Item Number / Title: 0670 / Other Navigation Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 8 / GW073: TIME FREQUENCY DISTRIBUTION SYSTEMREPLACEMENT MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 0.000 0.720 1.714 1.560 0.000 1.560 1.548 2.295 2.675 2.731 1.267 14.510 Total - - - - - - - - - - - - 0.000 0.720 1.714 1.560 0.000 1.560 1.548 2.295 2.675 2.731 1.267 14.510 - - - - - - - - - - - - 0.000 0.720 1.714 1.560 0.000 1.560 1.548 2.295 2.675 2.731 1.267 14.510 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: TIME FREQUENCY DISTRIBUTION SYSTEM-REPLACEMENT (TFDS-R): These funds are required for the procurement and installation of Time Frequency Distribution System-Replacement (TFDS-R) on submarines. LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 56 of 64 P-1 Line #3 Volume 1 - 80 === page 159 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 8 / GW073: TIME FREQUENCY DISTRIBUTION SYSTEMREPLACEMENT MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: GW073: TIME FREQUENCY DISTRIBUTION SYSTEM-REPLACEMENT B Kits Recurring 1.1.1) TFDS-R Backfit - NonOrganic - (96) 1.1.2) TFDS-R TI-24AF - NonOrganic - (97) Subtotal: Recurring Subtotal: Procurement, All Modification Items - 3 / 0.360 / / 0.000 - Subtotal: GW073: TIME FREQUENCY DISTRIBUTION SYSTEM-REPLACEMENT / - 4 / 0.490 3 / 0.360 / 0.720 - / - 5 / 0.612 - 6 / 0.720 / 1.102 - 9 / 1.102 4 / 0.499 - / - 1 / 0.125 - / - / 0.624 - / - 5 / 0.624 - / - - / - - / 0.624 - / 1.018 - / 1.429 - / 1.459 - / 1.490 - / 0.000 - / 7.842 / 0.000 - / 0.936 - / 0.530 - / 0.866 - / 1.216 - / 1.241 - / 1.267 - / 6.668 / - - / 0.936 - / 0.530 - / 0.866 - / 1.216 - / 1.241 - / 1.267 - / 6.668 - / 0.000 - / 0.720 - / 1.102 - / 0.624 Modification Item 1 of 1: GW073: TIME FREQUENCY DISTRIBUTION SYSTEM-REPLACEMENT - / 0.000 - / 0.000 - / 0.612 - / 0.936 Subtotal: Installation - / 0.000 / - - / 0.612 - / 0.936 4 / 0.499 4 / 0.509 1 / 0.125 - / 0.624 4 / 0.520 4 / 0.509 - 5 / 0.624 / 1.018 8 / 1.018 4 / 0.531 7 / 0.909 - / 1.429 11 / 1.429 4 / 0.542 7 / 0.928 - / 1.459 11 / 1.459 - 7 / 0.948 - / 1.490 - / / 0.000 - 11 / 1.490 / - - / - 27 / 3.451 34 / 4.391 - / 7.842 61 / 7.842 Installation - - Total Total Cost (Procurement + Support + Installation) LI 0670 - Other Navigation Equipment Navy 0.000 0.720 1.714 1.560 0.000 UNCLASSIFIED Page 57 of 64 1.560 1.548 2.295 P-1 Line #3 2.675 2.731 1.267 14.510 Volume 1 - 81 === page 160 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 8 / GW073: TIME FREQUENCY DISTRIBUTION SYSTEMREPLACEMENT MDAP/MAIS Code: Modification Item 1 of 1: GW073: TIME FREQUENCY DISTRIBUTION SYSTEM-REPLACEMENT Manufacturer Information Manufacturer Name: Brandywine Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Jan 2032 FY 2030 FY 2031 Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 0 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Delivery Dates Manufacturer Name: Brandywine Manufacturer Location: San Diego CA Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Jan 2032 Installation Information Method of Implementation: AIT:: Installation Name: TFDS-R Backfit Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - - / - 3 / 0.306 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 3 / 0.306 FY 2026 - / - - / - - / - 4 / 0.416 0 / 0.000 4 / 0.416 - / - - / - - / - - / - 0 / 0.000 4 / 0.416 FY 2027 - / - - / - - / - - / - - / - - / - 4 / 0.424 - / - - / - - / - 0 / 0.000 4 / 0.424 FY 2028 - / - - / - - / - - / - - / - - / - - / - 4 / 0.433 - / - - / - 0 / 0.000 4 / 0.433 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.442 - / - 0 / 0.000 4 / 0.442 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.451 0 / 0.000 4 / 0.451 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.461 4 / 0.461 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - - Installation Cost LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 58 of 64 P-1 Line #3 / - / - - / - / - Volume 1 - 82 === page 161 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 8 / GW073: TIME FREQUENCY DISTRIBUTION SYSTEMREPLACEMENT MDAP/MAIS Code: Modification Item 1 of 1: GW073: TIME FREQUENCY DISTRIBUTION SYSTEM-REPLACEMENT Installation Information Method of Implementation: AIT:: Installation Name: TFDS-R Backfit Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - - 3 / 0.306 4 / 0.416 0 / 0.000 4 / 0.416 4 / 0.424 4 / 0.433 4 / 0.442 4 / 0.451 4 / 0.461 27 / 2.933 Total / - / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - 3 - - - 4 - - - 4 - - - 4 - - - 4 - - - 4 - - 4 27 Out - - - - - - 3 - - - 4 - - - 4 - - - 4 - - - 4 - - - 4 - - 4 27 Method of Implementation: AIT:: Installation Name: TFDS-R TI-24AF Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - - / - 3 / 0.306 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 3 / 0.306 FY 2026 - / - - / - - / - 5 / 0.520 0 / 0.000 5 / 0.520 - / - - / - - / - - / - 0 / 0.000 5 / 0.520 FY 2027 - / - - / - - / - - / - - / - - / - 1 / 0.106 - / - - / - - / - 0 / 0.000 1 / 0.106 FY 2028 - / - - / - - / - - / - - / - - / - - / - 4 / 0.433 - / - - / - 0 / 0.000 4 / 0.433 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 7 / 0.774 - / - 0 / 0.000 7 / 0.774 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / 0.790 0 / 0.000 7 / 0.790 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / 0.806 7 / 0.806 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - - / - 3 / 0.306 Installation Cost LI 0670 - Other Navigation Equipment Navy 5 / 0.520 0 / 0.000 UNCLASSIFIED Page 59 of 64 5 / 0.520 1 / 0.106 4 / 0.433 P-1 Line #3 7 / 0.774 7 / 0.790 / - / - 7 / 0.806 - - / - / - 34 / 3.735 Volume 1 - 83 === page 162 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 8 / GW073: TIME FREQUENCY DISTRIBUTION SYSTEMREPLACEMENT MDAP/MAIS Code: Modification Item 1 of 1: GW073: TIME FREQUENCY DISTRIBUTION SYSTEM-REPLACEMENT Installation Information Method of Implementation: AIT:: Installation Name: TFDS-R TI-24AF Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - 3 - - - 5 - - - 1 - - - 4 - - - 7 - - - 7 - - 7 34 Out - - - - - - 3 - - - 5 - - - 1 - - - 4 - - - 7 - - - 7 - - 7 34 Footnotes: (96) Transition from development to production in FY25. This effort replaces the current TFDS on SSNs and SSBNs to address the obsolescence issues associated with the existing unit and provides the improvements necessary for the system to meet the combat systems and C4I performance needs on submarines. (97) Transition from development to production in FY25. This effort replaces the current TFDS on SSNs and SSBNs to address obsolescence and provide the Precise Timing Protocol (PTP) source needed by the future payloads as well as other Cyber security enhancements for those ships not receiving a TI-24 modernization before TFDS end of life. Procurement quantity decreased from FY 2026 to FY 2027 based on the system delivery requirements. LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 60 of 64 P-1 Line #3 Volume 1 - 84 === page 163 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 P-1 Line Item Number / Title: 0670 / Other Navigation Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 9 / GW066: SSBN NAVIGATION SENSOR OBSOLESCENCE MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 0.000 2.775 1.326 3.771 0.000 3.771 2.759 1.407 1.188 1.213 0.259 14.698 Total - - - - - - - - - - - - 0.000 2.775 1.326 3.771 0.000 3.771 2.759 1.407 1.188 1.213 0.259 14.698 - - - - - - - - - - - - 0.000 2.775 1.326 3.771 0.000 3.771 2.759 1.407 1.188 1.213 0.259 14.698 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: These funds are for the procurement and associated installations which will address obsolescence issues associated with the AN/BSN-2 Digital Depth Detector and TFDS. It also leverages updates to COLUMBIA Class architecture to remove dedicated Mission Critical Control Panel (MCCP). LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 61 of 64 P-1 Line #3 Volume 1 - 85 === page 164 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 9 / GW066: SSBN NAVIGATION SENSOR OBSOLESCENCE FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: GW066: SSBN NAVIGATION SENSOR OBSOLESCENCE B Kits Recurring 1.1.1) SSBN Navigation Sensor Obsolescence NonOrganic - (98) Subtotal: Recurring Subtotal: Procurement, All Modification Items / 0.000 - Subtotal: GW066: SSBN NAVIGATION SENSOR OBSOLESCENCE / - - 3 / 2.550 - / - / 2.550 1 / 0.867 - 3 / 2.550 / 0.867 - 1 / 0.867 4 / 3.537 - / - 4 / 3.537 / - / - - / - - / 3.537 - / 1.804 - / 0.920 - / 0.939 - / 0.959 - / 0.000 / 0.000 - / 0.234 - / 0.955 - / 0.487 - / 0.249 - / 0.254 - / 0.259 - / 3.122 / - - / 0.234 - / 0.955 - / 0.487 - / 0.249 - / 0.254 - / 0.259 - / 3.122 - / 0.000 - / 2.550 - / 0.867 - / 3.537 Modification Item 1 of 1: GW066: SSBN NAVIGATION SENSOR OBSOLESCENCE - / 0.000 - / 0.225 - / 0.459 - / 0.234 Subtotal: Installation - / 0.000 - / 0.225 - / 0.459 - / 0.234 - 1 / 0.920 - 1 / 0.939 / 0.000 13 / 11.576 / - - / 0.959 - - 2 / 1.804 / 0.939 1 / 0.959 - - / 0.920 1 / 0.939 / 3.537 4 / 3.537 / 1.804 1 / 0.920 4 / 3.537 - / 3.537 2 / 1.804 - 1 / 0.959 - / - / 11.576 - 13 / 11.576 / 11.576 - Installation - Total Total Cost (Procurement + Support + Installation) LI 0670 - Other Navigation Equipment Navy 0.000 2.775 1.326 3.771 0.000 UNCLASSIFIED Page 62 of 64 3.771 2.759 1.407 P-1 Line #3 1.188 1.213 0.259 14.698 Volume 1 - 86 === page 165 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 9 / GW066: SSBN NAVIGATION SENSOR OBSOLESCENCE MDAP/MAIS Code: Modification Item 1 of 1: GW066: SSBN NAVIGATION SENSOR OBSOLESCENCE Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 0 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Manufacturer Name: WR Systems Manufacturer Location: Norfolk VA Administrative Leadtime (in Months): 4 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Jan 2032 Installation Information Method of Implementation: AIT:: Installation Name: SSBN Navigation Sensor Obsolescence Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - 1 / 0.225 2 / 0.459 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 3 / 0.684 FY 2026 - / - - / - - / - 1 / 0.234 0 / 0.000 1 / 0.234 - / - - / - - / - - / - 0 / 0.000 1 / 0.234 FY 2027 - / - - / - - / - - / - - / - - / - 4 / 0.955 - / - - / - - / - 0 / 0.000 4 / 0.955 FY 2028 - / - - / - - / - - / - - / - - / - - / - 2 / 0.487 - / - - / - 0 / 0.000 2 / 0.487 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.249 - / - 0 / 0.000 1 / 0.249 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.254 0 / 0.000 1 / 0.254 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.259 1 / 0.259 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - 1 / 0.225 LI 0670 - Other Navigation Equipment Navy / - 2 / 0.459 1 / 0.234 0 / 0.000 UNCLASSIFIED Page 63 of 64 1 / 0.234 4 / 0.955 2 / 0.487 P-1 Line #3 1 / 0.249 1 / 0.254 / - / - 1 / 0.259 - - / - / - 13 / 3.122 Volume 1 - 87 === page 166 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0670 / Other Navigation Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 6 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 9 / GW066: SSBN NAVIGATION SENSOR OBSOLESCENCE MDAP/MAIS Code: Modification Item 1 of 1: GW066: SSBN NAVIGATION SENSOR OBSOLESCENCE Installation Information Method of Implementation: AIT:: Installation Name: SSBN Navigation Sensor Obsolescence Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - 1 - 2 - - - 1 - - - 4 - - - 2 - - - 1 - - - 1 - - 1 13 Out - - - - 1 - 2 - - - 1 - - - 4 - - - 2 - - - 1 - - - 1 - - 1 13 Footnotes: (98) Procurement quantity increase from FY 2026 to FY 2027 is based on the system delivery requirements LI 0670 - Other Navigation Equipment Navy UNCLASSIFIED Page 64 of 64 P-1 Line #3 Volume 1 - 88 === page 167 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0840 / Sub Periscope, Imaging and Supt Equip Prog Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 1,141.286 275.575 1,141.286 275.575 1,141.286 275.575 204.863 204.863 204.863 344.885 - 0.000 - 344.885 - 0.000 - 344.885 0.000 344.885 344.885 344.885 325.905 325.905 325.905 327.404 327.404 327.404 325.493 325.493 - To FY 2031 Complete 341.240 Continuing 341.240 Total - Continuing Continuing - Continuing - - 325.493 341.240 Continuing Continuing 208.763 193.845 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 52.565 - 36.101 - 36.101 88.678 99.049 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Submarine Periscope, Imaging, and Support Equipment program provides critical electromagnetic systems to all classes of submarine platforms. This includes Imaging, Electronic Warfare (EW), and RADAR systems which provide navigation safety and collision avoidance, particularly in high intensity littoral operations so that surveillance and weapons systems can be effectively employed. Integrated Submarine Imaging System (ISIS) and EW BLQ-10 systems are part of the Submarine Warfare Federated Tactical Systems (SWFTS), a family of interdependent systems that conduct cooperative system development, procurement, and installations. PMS435 procures and installs ISIS and EW BLQ-10 Technical Insertion (TI) shipsets, along with the other SWFTS Participating Acquisition Resource Managers (PARMs), PMS401 (A-RCI) under BLI 2150 and PMS425 (BYG-1) under BLI 5420. SWFTS TI shipsets must be procured and installed in like quantities (except EW SSBN (OHIO)) across all PARMs to maintain the SWFTS model. The Submarine Periscopes and Imaging Equipment Program procures ISIS including Type 18 and Type 8 periscope upgrades; the Photonics Mast and its variants, including the Type 20 and Type 24; inboard hardware kits; imaging upgrades for all submarine classes; Photonics land-based spares, depot tooling and mast maintenance equipment. ISIS supports high intensity operations in the littorals, providing the submarine force with the tactical imaging systems necessary to safely and effectively employ its surveillance and weapons capabilities. The infrared imaging capability provided by ISIS provides all weather imaging capability, improving imaging at night and in low visibility conditions. Technology Insertion initiatives include the common control and displays hardware and software on all platforms regardless of imaging sensors, an integrated imaging system that provides for operator alerts, imaging enhancement tools and contact analysis tools, incorporation of Type 20 Mast, Type 24 Mast, future sensors, and a fully Submarine Warfare Federated Tactical System (SWFTS) integrated system. Funding improves submarine imaging capability in the areas of: ship safety, Intelligence, Surveillance and Reconnaissance (ISR), and tactical control (contact management in the littorals) by providing high quality imaging 24 hours a day, 7 days a week in all weather conditions to support submarine operations worldwide. By OPNAV Ltr Ser. N77/3U629209, 12 June 2003, OPNAV N87 established the ISIS to rapidly field these systems and integrate existing periscope imagery systems into a single system for installation on board submarines. An ISIS Capability Development Document (CDD) was approved 22 Dec 2011, with an update to the CDD approved on 15 Mar 2018 and a CDD Annex for Low Profile Digital Photonics Mast approved on 02 Dec 2019. The CDD is used to fully integrate the ISIS program of record into the submarine force's rapid technology insertion process and to incorporate Fleet-endorsed requirements such as Low Profile Photonics Mast (LPPM). PL010 - Imaging ISIS Technical Insertion Continues procurement, installation, and engineering of Technical Insertion kits, system training requirements, and spares to upgrade ISIS systems on LOS ANGELES, SEAWOLF, VIRGINIA, OHIO SSGN/ SSBN, and COLUMBIA Class SSBN platforms to allow for capability insertion and obsolescence avoidance. Starting with TI-16, funding includes the one time change for improved copper-fiber optic diploops and hull penetrators (Mast Compatibility) required to support advanced Imaging and early warning capabilities included in LPPM, Type 20, and Type 24 Masts. LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 1 of 40 P-1 Line #4 Volume 1 - 89 === page 168 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0840 / Sub Periscope, Imaging and Supt Equip Prog Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A PL011 - Imaging Upgrades: Type 8/Type 18 Continues procurement and installation of Periscopes and Imaging Equipment reliability, capability, and maintainability upgrades, e.g., Eyepiece Box, periscope mechanical hoisting mechanism upgrades, inboard electronic processing hardware and associated Integrated Logistics Support (ILS), Robust Surveillance Program, Certification of regional repair centers for Imaging System maintenance and technical data. Variable quantities and types are bought in each fiscal year based on Fleet-endorsed requirements. Procures and installs Infrared (IR) Collision Avoidance Systems for the SSBN (OHIO) Class submarines. PL012 - Periscope Special Support Equipment Procures replacements in support of Special Support Equipment (SSE) for each maintenance level to ensure imaging systems are maintained in a state of operational readiness. Equipment includes Q-Band Test Equipment, Mast Dynamic Collimator, Eyebox/Mast Test Set, and Antenna/Outer Head Simulator required due to obsolescence of existing imaging systems SSE. PL015 - Periscope Interim Contractor Support Funding is for Interim Contract Support provided by the periscope manufacturer. The majority of the funding is for Type 18 service life extension, depot repair and upgrades for all configurations of Photonics Masts including LPPM, Type 20, and Type 24 masts. It also funds all levels of repairs for all types of tactical submarine imaging systems and establishes the Photonics National Maintenance Center (NMC) to accelerate availability and delivery of photonics masts to the fleet. FY25 begins to provide Low Profile Mast (LPM) special support equipment (SSE) and special test equipment (STE) to increase the LPM repair capability at Pearl Harbor, Hawaii to support critical U.S. Pacific Fleet (PACFLT) operations. PL016 - Periscope Training Funding is for imaging systems training requirements to include curriculum development, training materials, and initial factory training pilot course conduct, Navy Training Plans, and instructor advisory services. PL025 - Low Profile Mast Funding is for the procurement, installation, support and technical insertion of VIRGINIA and COLUMBIA Class low profile imaging masts (including LPPM, Type 20, Type 24, and Type 2S) production modules and land based spare masts and associated components. The spares will be used for replacement Imaging Masts on VIRGINIA and COLUMBIA Class submarines. Quantity of spares will increase with VIRGINIA and COLUMBIA submarine procurements. Funding is also for Mast Capability Enhancements (MCE) and System for Non-Acoustics Control of Signatures (SNACS) capabilities to provide advanced sensitive mast technologies to improve tactical operations and reduce the risk of counter detection. PL830 - Periscope Production Engineering Production Engineering funds provide the following functions: value engineering; review and evaluation of production design data and documentation; production configuration control; maintenance engineering efforts designed and incorporated into the production manufacturing process, and other related engineering functions that are integral to all of the Imaging Systems and ancillary components. The Submarine Support Equipment Program (SSEP) procures submarine Electronic Warfare (EW) systems: AN/BLQ-10, Multifunction Modular Masts (MMM) Payloads, Communications Acquisition and Direction-Finding (CADF) systems, Electronic Warfare Tactical Upgrade (EWTU), Field Change Kits, Submarine Tethered Expendable Buoy (STEB), the SSBN (OHIO) Collision Avoidance System, Mission Configurable Bay (MCB) on VA Block I/II, PATRIOT and BPS 15/16/17 RADARs. The SSEP also supports all ILS, production engineering, Cyber, sustainment, and installation requirements for EW systems. The Technical Insertion/Advanced Processing Build (TI/APB) SWFTS model modernizes and sustains SSNs/SSGNs through executing bi-annual software APBs and bi-annual hardware TIs. SWFTS related annual funding varies based on the number of modernizations funded. The Submarine EW Capability Development Document (CDD) 907-97-16 was approved on 27 September 2016 and provides all requirements for Submarine EW systems. Both the EWTU and the AN/BLQ-10 are required to meet the Submarine EW CDD. Procurement of the EWTU fills the gap in CADF capability in VA BLK IV to meet the EW CDD requirements. A gap was created when the CADF production line closed at the end of VA BLK III production and the subsequent cancellation of TI-16/18 NGA contracts, which would have replaced ICADF. ML003 - SSEP Special Support Equipment SSEP special support equipment allows for the procurement and grooming of special purpose test equipment utilized by the Type Commander Groom Teams. Exact quantities vary from year to year based on Fleet requirements. Beginning in FY25, procures additional special support equipment (SSE), special test equipment (STE) and spares for Submarine Surveillance Equipment Program, Pacific's (SSEP PAC's) increased mission support in Guam. Funding needed to certify SSNs for Western Pacific (WESTPAC) deployments and support forward deployed operations. LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 2 of 40 P-1 Line #4 Volume 1 - 90 === page 169 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0840 / Sub Periscope, Imaging and Supt Equip Prog Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A ML007 - CADF Procures and installs the Server Based Communications Acquisition and Direction Finding (SB-CADF) systems for installation on LOS ANGELES, SEAWOLF, VIRGINIA and COLUMBIA Class submarines. ML012 (P-40a) - SWFTS Supportability and Integration Tech Refresh provides for software and hardware updates to accommodate shifts in technology to the execution procurement years "current state-of-the-practice" hardware. Updates are necessary for signal and display processing hardware as software is introduced or as commercial support for the hardware is phased out. The EW Engineering Measurement Program provides analytical and testing support to improve design and requirements. When EW systems are being upgraded to subsequent phases, signal processing and display hardware will be upgraded to accommodate common technology consistent with the APB being implemented in the year of introduction. In future years, requirements include additional equipment to prevent COTS hardware from becoming unsupportable/obsolete. Funding will be used to support non-recurring first article test efforts associated with changing COTS environment, procuring test equipment and simulators. Supports Government Furnished Information (GFI) management and coordination, monitoring of contractor cost, performance and schedule, cost analysis and estimation, contract specification development and monitoring of contract deliverables. Addresses the Cyber requirements associated with procuring, engineering and sustaining EW systems. Also supports EW system training requirements to include curriculum development, training materials, and initial factory training pilot course conduct, Navy Training Plans, instructor advisory services, and hardware/software upgrades for EW trainers. ML012 (P-3a) - AN/BLQ-10 Technical Insertion Procures and installs the AN/BLQ-10 EW system for installation on LOS ANGELES, SEAWOLF, VIRGINIA, and COLUMBIA Class submarines beginning with TI-20. AN/BLQ-10 achieves EW superiority through hardware and software updates to pace the threat and brings EW fully onto the SWFTS model. Tech insertion procures and installs the hardware necessary to upgrade and back-fit EW systems. This system will be fully aligned with SWFTS, with the exception of SSBN (OHIO) Class, and provides capabilities required by the EW Capability Development Document (CDD). ML014 - Legacy Submarine Surveillance Measures Continues legacy Submarine Electronic Surveillance Measures (SubESM) procurement including AN/BRD-7 and AN/WLR-8 Reliability and Maintainability (R&M) obsolescence and operational Field Change Kits and other materials for Obsolescence Mitigation, e.g., Digital Display Unit (DDU) obsolescence upgrade, Solid State Memory, Heat Dissipation improvement, related H,M&E sail components, Analog relay replacement, antenna cabling replacement, related Hull, Mechanical & Electrical (H,M&E) sail components and associated Integrated Logistics Support (ILS), and technical data. ML017 - AN/BLQ-10 Field Change Kits Procures and installs AN/BLQ-10 subsystem Product Improvement Field Change Kits including: emergent Engineering Changes, SWFTS associated Integrated Logistics Support (ILS) and technical data. Provides AN/BLQ-10 intermediate level repairs, changes and maintenance activities and associated materials that improve the overall Reliability, Maintainability and Availability of fielded EW systems. Procures sustainment efforts for AN/BLQ-10 active, deploying fleet assets. Provides funding for procurement and installation of the MMM Payload to support submarine Fleet required improved Unmanned Aerial System (UAS) communications and advanced EW capabilities. Procures and installs Submarine Tethered Expendable Buoy (STEB), a 3" Launcher deployed, expendable, free-floating buoy that will communicate with the submarine through a fiber-optic tether. STEB provides Indications and Warning and Third Party Targeting through imaging, communications, and Radar acquisition and direction finding. Procures and installs the Automated Range Finder (ARF) SSBN (OHIO) Class submarine Collision Avoidance System. This system will increase situational awareness while operating at periscope depth, improving the submarine's safety, stealth, and security. Also, updates the Mission Configurable Bay (MCB) on the first eight (8) Virginia Class SSNs to receive a Multifunction Modular Mast (MMM). This effort ensures all SSNs support payload required for Fleet priorities such as Submarine Launched Unmanned Aerial System (SLUAS) and other carry-on equipment. ML021 - Submarine RADAR Submarine RADAR funds provide AN/BPS-15/16/17 Reliability, Maintainability and Availability (RMA), Field Change Kits and material procurements for obsolescence mitigation. Provides in-service and systems engineering, logistics, material, configuration management, quality assurance, installation and test certification support only for the Submarine Surface Navigation (AN/BPS-15/16/17) RADAR. Provides for interface with the conjoined Voyage Management System (VMS) and Electronic Chart & Display Information System - Navy (ECDIS-N). Provides for AN/BPS-17 RADAR hardware and software improvements, backfit upgrades to in-service boats, and address ongoing component obsolescence issues. Funding addresses sustainability of PATRIOT Phase B RADAR including repair/refurbishment, inservice engineering, and modernization. ML830 - EW Production Engineering LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 3 of 40 P-1 Line #4 Volume 1 - 91 === page 170 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0840 / Sub Periscope, Imaging and Supt Equip Prog Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Production Engineering funds provide the following functions: value engineering; review and evaluation of production design data and documentation; production configuration control; maintenance engineering efforts designed and incorporated into the production manufacturing process, and other related engineering functions that are integral to all production EW Systems and upgrades. LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 4 of 40 P-1 Line #4 Volume 1 - 92 === page 171 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0840 / Sub Periscope, Imaging and Supt Equip Prog Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a SUBMARINE PERISCOPES & IMAGING EQUIPMENT - / 133.298 - / 20.262 - / 17.755 - / 15.485 - / - - / 15.485 P-40a SUBMARINE SUPPORT EQUIPMENT PROGRAM - / 272.757 - / 61.106 - / 65.838 - / 63.464 - / - - / 63.464 P-3a 1 / PL010 - IMAGING ISIS TECHNICAL INSERTION (SWFTS) (SHIPALT) - / 278.980 - / 37.549 - / 16.004 - / 52.999 - / 0.000 - / 52.999 P-3a 2 / PL011 IMAGING UPGRADES: TYPE 8/TYPE 18 (ORDALT) / 3.785 - / 8.148 - / 3.856 - / 3.852 - / 0.000 - / 3.852 P-3a 3 / PL025 LOW PROFILE IMAGING MAST (SHIPALT) - / 127.459 - / 44.238 - / 40.657 - / 39.864 - / 0.000 - / 39.864 P-3a 4 / ML007 CADF (SWFTS) (SHIPALT) - / 46.764 - / 13.156 - / 1.124 - / 29.648 - / 0.000 - / 29.648 P-3a 5 / ML012 - AN/BLQ-10 TECHNICAL INSERTION (SWFTS) (SHIPALT) - / 137.882 - / 47.592 - / 9.596 - / 84.638 - / 0.000 - / 84.638 P-3a 6 / ML017 AN/BLQ-10 FIELD CHANGE KITS (ORDALT) - / 140.361 - / 43.524 - / 50.033 - / 54.935 - / 0.000 - / 54.935 P-40 Total Gross/Weapon System Cost / 1,141.286 - / 275.575 - / 204.863 - / 344.885 - / 0.000 - / 344.885 - - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a SUBMARINE PERISCOPES & IMAGING EQUIPMENT - / - - / - - / - - / - - / - - / - P-40a SUBMARINE SUPPORT EQUIPMENT PROGRAM - / - - / - - / - - / - - / - - / - P-3a 1 / PL010 - IMAGING ISIS TECHNICAL INSERTION (SWFTS) (SHIPALT) P-3a 2 / PL011 IMAGING UPGRADES: TYPE 8/TYPE 18 (ORDALT) - / 3.861 - / 1.407 - / 0.479 - P-3a 3 / PL025 LOW PROFILE IMAGING MAST (SHIPALT) - / 51.415 - / 52.443 - / 42.536 - P-3a 4 / ML007 CADF (SWFTS) (SHIPALT) - / 22.107 - / 25.813 - / 29.656 - / 30.555 P-3a 5 / ML012 - AN/BLQ-10 TECHNICAL INSERTION (SWFTS) (SHIPALT) - / 68.421 - / 80.126 - / 92.272 - P-3a 6 / ML017 AN/BLQ-10 FIELD CHANGE KITS (ORDALT) - / 52.161 - / 47.638 - / 50.276 - P-40 Total Gross/Weapon System Cost - / 325.905 - / 327.404 - / 325.493 - - / 44.133 - / 54.479 - / 52.609 - Continuing Continuing / 0.488 Continuing Continuing / 43.386 Continuing Continuing Continuing Continuing / 96.768 - - / 50.145 Continuing Continuing / 341.240 Continuing Continuing / 59.045 / 24.318 / 641.613 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Imaging FY27 procures Integrated Submarine Imaging System (ISIS) Submarine Warfare Federated Tactical Systems (SWFTS) shipsets for (8) VA Class submarines, (2) LA Class submarines, and (1) SSBN (OHIO) Class submarine. Imaging FY27 funds installs for ISIS SWFTS shipsets on (4) VA Class submarines. Electronic Warfare (EW) FY27 procures AN/BLQ-10 SWFTS shipsets for (8) VA Class submarines and (2) LA Class submarines. EW FY27 funds installs for AN/BLQ-10 SWFTS shipsets on (4) VA Class submarines. Both Imaging and EW funding provides backfill for (4) VA TI kits originally planned for FY26 in support of maintaining SWFTS installation profile. Beginning in FY27, an annual funding line is established for the AN/BPS-17 RADAR to support hardware and software improvements, backfit upgrades to inservice boats, and address ongoing component obsolescence issues. LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 5 of 40 P-1 Line #4 Volume 1 - 93 === page 172 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: SUBMARINE PERISCOPES & IMAGING EQUIPMENT FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) PL012 PERISCOPE SPECIAL SUPPORT EQIPMENT 1.1) SPECIAL SUPPORT EQUIPMENT A - - 4.685 - - 0.640 - - 0.653 - - 0.666 - - - - - 0.666 - - 4.685 - - 0.640 - - 0.653 - - 0.666 - - - - - 0.666 - - 95.784 - - 15.141 - - 12.532 - - 10.379 - - - - - 10.379 - - 95.784 - - 15.141 - - 12.532 - - 10.379 - - - - - 10.379 - - 1.561 - - 0.213 - - 0.217 - - - - - - - - - - - 1.561 - - 0.213 - - 0.217 - - - - - - - - - - - 31.268 - - 4.268 - - 4.353 - - 4.440 - - - - - 4.440 Subtotal: 4) PL830 PERISCOPE PRODUCTION ENGINEERING - - 31.268 - - 4.268 - - 4.353 - - 4.440 - - - - - 4.440 Total - - 133.298 - - 20.262 - - 17.755 - - 15.485 - - - - - 15.485 Subtotal: 1) PL012 PERISCOPE SPECIAL SUPPORT EQIPMENT 2) PL015 PERISCOPE INTERIM CONTRACTOR SUPPORT 2.1) INTERIM CONTRACTOR SUPPORT A Subtotal: 2) PL015 PERISCOPE INTERIM CONTRACTOR SUPPORT 3) PL016 PERISCOPE TRAINING 3.1) TRAINING (1) A Subtotal: 3) PL016 PERISCOPE TRAINING 4) PL830 PERISCOPE PRODUCTION ENGINEERING 4.1) PRODUCTION ENGINEERING A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (1) Beginning in FY27, PL016 Imaging Training requirement is captured in PL010 Imaging SWFTS TI Support to optimize training design and execution. LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 6 of 40 P-1 Line #4 Volume 1 - 94 === page 173 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: SUBMARINE SUPPORT EQUIPMENT PROGRAM FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) ML003 SSEP SPECIAL SUPPORT EQUIPMENT 1.1) SPECIAL SUPPORT EQUIPMENT A Subtotal: 1) ML003 SSEP SPECIAL SUPPORT EQUIPMENT - - 2.821 - - 4.342 - - 4.350 - - 1.526 - - - - - 1.526 - - 2.821 - - 4.342 - - 4.350 - - 1.526 - - - - - 1.526 - - 136.446 - - 28.866 - - 31.978 - - 29.942 - - - - - 29.942 - - 49.434 - - 10.146 - - 10.349 - - 10.556 - - - - - 10.556 - - 185.880 - - 39.012 - - 42.327 - - 40.498 - - - - - 40.498 2) ML012 SWFTS SUPPORTABILITY AND INTEGRATION 2.1) COTS TECH REFRESH A 2.2) CYBER AND TRAINING SUPPORT A Subtotal: 2) ML012 SWFTS SUPPORTABILITY AND INTEGRATION 3) ML014 LEGACY SUBMARINE ELECTRONIC SURVEILLANCE MEASURES (SubESM) 3.1) LEGACY SubESM A Subtotal: 3) ML014 LEGACY SUBMARINE ELECTRONIC SURVEILLANCE MEASURES (SubESM) - - 2.888 - - 0.325 - - 0.325 - - 0.325 - - - - - 0.325 - - 2.888 - - 0.325 - - 0.325 - - 0.325 - - - - - 0.325 - - 52.495 - - 13.513 - - 14.844 - - 17.043 - - - - - 17.043 - - 52.495 - - 13.513 - - 14.844 - - 17.043 - - - - - 17.043 4) ML021 SUBMARINE RADARs 4.1) SUBMARINE RADARs (2) A Subtotal: 4) ML021 SUBMARINE RADARs 5) ML830 PRODUCTION ENGINEERING 5.1) PRODUCTION ENGINEERING A - - 28.673 - - 3.914 - - 3.992 - - 4.072 - - - - - 4.072 Subtotal: 5) ML830 PRODUCTION ENGINEERING - - 28.673 - - 3.914 - - 3.992 - - 4.072 - - - - - 4.072 Total - - 272.757 - - 61.106 - - 65.838 - - 63.464 - - - - - 63.464 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (2) Funding increase in FY27 to address AN/BPS-17 improvements. Funding is required to (1) Support development of AN/BPS-17 RADAR Manager Software (BRMS) baselines to interface with improved capability sensors. (2) Procure an updated Integrated Communication Electronics (ICE) drawer to address ongoing component obsolescence issues. (3) Procure, integrate, and install improved Mast-Mounted RADAR (MMR) and Clip-On RADAR (COR) sensors as backfit upgrades to in-service boats. LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 7 of 40 P-1 Line #4 Volume 1 - 95 === page 174 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / PL010 - IMAGING ISIS TECHNICAL INSERTION (SWFTS) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 37.549 16.004 52.999 0.000 52.999 44.133 54.479 52.609 278.980 278.980 - - - - - - - - 37.549 16.004 52.999 0.000 52.999 44.133 54.479 52.609 278.980 - - - - - - - - 37.549 16.004 52.999 0.000 52.999 44.133 54.479 52.609 To FY 2031 Complete 59.045 Continuing - Continuing - 59.045 Continuing - Total - Continuing - - 59.045 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Provides for the modernization of Imaging systems and Technical Insertion kits to upgrade Integrated Submarine Imaging System (ISIS) on LOS ANGELES, SEAWOLF, VIRGINIA, OHIO SSBN/SSGN, and COLUMBIA Class SSBN platforms in support of Intelligence, Surveillance and Reconnaissance (ISR) requirements. Unit costs for ISIS kit procurement and installation vary based on platform. VIRGINIA and COLUMBIA ISIS kits require a higher unit cost than the LOS ANGELES and SEAWOLF as they utilize technically advanced masts that require more sophisticated ISIS hardware and software to support them. Beginning with TI-16, each VIRGINIA requires a one-time critical modernization hardware update in order to field Low Profile Photonics Mast (LPPM), Type 20, and Type 24 Masts on these modernization hulls. This is known as Mast Compatibility (MC) and includes procurement of copper/fiber diploops and hull penetrators thus requiring a higher unit cost for VIRGINIA TI shipsets with MC. This line item aligns the periscope, imaging, and support equipment with the Submarine Warfare Federated Tactical System (SWFTS) PMS401 (BLI 2150) acoustic and PMS425 (BLI 5420) combat control upgrades, as well as EW AN/ BLQ-10 equipment in ML012 and EW CADF equipment in ML007 of this budget line item. SWFTS TI shipsets must be procured and installed in like quantities (except EW SSBN (OHIO)) across all PARMs to maintain the SWFTS model. LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 8 of 40 P-1 Line #4 Volume 1 - 96 === page 175 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / PL010 - IMAGING ISIS TECHNICAL INSERTION (SWFTS) MDAP/MAIS Code: Models of Systems Affected: ISIS TI Related RDT&E PEs: 0604503N Modification Type: SHIPALT Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: PL010 - IMAGING ISIS TECHNICAL INSERTION (SWFTS) B Kits Recurring 1.1.1) 688/21 TECHNICAL INSERTION (SWFTS) NonOrganic 44 / 33.765 - / - - / - 2 / 2.674 - / - 2 / 2.674 2 / 2.728 - / - 3 / 4.257 1 / 1.447 1.1.2) VA TECHNICAL INSERTION with MAST 15 / 76.463 1 / 6.157 - / - - / - - / - - / - 1 / 6.534 - / - - - 10 / 35.971 3 / 12.318 - / - 8 / 34.176 - / - 8 / 34.176 4 / 17.428 7 / 31.108 17 / 3.060 2 / 0.486 - / - 1 / 0.253 - / - 1 / 0.253 1 / 0.258 1 / 0.263 - - / - - / - - / - - / - - - 1 / 4.444 1 / 4.533 COMPATIBILITY (SWFTS) - NonOrganic (3) 1.1.3) VA TECHNICAL INSERTION without MAST COMPATIBILITY (SWFTS) - NonOrganic (4) 1.1.4) SSBN (OHIO) BACKFIT (SWFTS) - NonOrganic 1.1.5) SSBN (COLUMBIA) TECHNICAL INSERTION (SWFTS) - NonOrganic Subtotal: Recurring Subtotal: PL010 - IMAGING ISIS TECHNICAL INSERTION (SWFTS) Subtotal: Procurement, All Modification Items - / - / 149.259 - / 37.103 / - / 26.948 - / - - / 37.103 - / - - - / - 11 / 37.103 - / - 11 / 37.103 - / - - / 37.103 - / - - / 37.103 - / 26.948 - / 35.815 - / 31.455 - 8 / 26.948 / 31.455 - 9 / 35.815 / - 7 / 32.368 / - / 18.961 - / 35.815 5 / 22.665 6 / 18.961 - 86 / 149.259 / - / - - Continuing - / - Continuing 17 / 89.154 Continuing Continuing / - Continuing Continuing 1 / 4.624 Continuing Continuing / 38.439 Continuing Continuing 9 / 38.439 Continuing Continuing - / 38.439 Continuing Continuing - 9 / 31.455 / 149.259 - / 18.961 - / 99.543 - / 11.542 - / 11.773 - / 12.008 - / - - / 12.008 - / 12.248 - / 12.493 - / 12.743 - / 12.998 Continuing Continuing - / 99.543 - / 11.542 - / 11.773 - / 12.008 - / - - / 12.008 - / 12.248 - / 12.493 - / 12.743 - / 12.998 Continuing Continuing Modification Item 1 of 1: PL010 - IMAGING ISIS TECHNICAL INSERTION (SWFTS) - / 30.178 - / 7.046 - / 4.231 - / 3.888 Subtotal: Installation - / 30.178 - / 7.046 - / 4.231 - / 3.888 - Support (All Modification Items) 2.1) ISIS TECHNICAL INSERTION NRE Subtotal: Support Installation - / 0.000 - / 3.888 - / 4.937 - / 6.171 - / 8.411 - / 7.608 - / 9.024 - / 81.494 / - - / 3.888 - / 4.937 - / 6.171 - / 8.411 - / 7.608 - / 9.024 - / 81.494 59.045 Continuing - Total Total Cost (Procurement + Support + Installation) 278.980 LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy 37.549 16.004 52.999 0.000 UNCLASSIFIED Page 9 of 40 52.999 44.133 54.479 P-1 Line #4 52.609 Continuing Volume 1 - 97 === page 176 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / PL010 - IMAGING ISIS TECHNICAL INSERTION (SWFTS) MDAP/MAIS Code: Modification Item 1 of 1: PL010 - IMAGING ISIS TECHNICAL INSERTION (SWFTS) Manufacturer Information Manufacturer Name: Lockheed Martin Corporation Manufacturer Location: Manassas, VA Administrative Leadtime (in Months): 4 Production Leadtime (in Months): 18 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jul 2026 Jul 2027 Jul 2028 Jul 2029 Jul 2030 Jul 2031 Jul 2032 Installation Information Method of Implementation: AIT:: Installation Name: 688/21 TECHNICAL INSERTION (SWFTS) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 42 / 11.929 44 / 12.697 Prior Years 2 / 0.768 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - 2 / 0.816 - / - - / - - / - 0 / 0.000 2 / 0.816 FY 2028 - / - - / - - / - - / - - / - - / - - / - 2 / 0.832 - / - - / - 0 / 0.000 2 / 0.832 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 1.296 0 / 0.000 3 / 1.296 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.440 1 / 0.440 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - 2 / 0.768 - / - - / - - / - - / - 2 / 0.816 2 / 0.832 - / - 3 / 1.296 Total 42 / 11.929 / - - / - - 1 / 0.440 / - / - 52 / 16.081 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 42 - - - 2 - - - - - - - - - - - 2 - - - 2 - - - - - - - 3 1 52 Out 42 - - - 2 - - - - - - - - - - - 2 - - - 2 - - - - - - - 3 1 52 LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 10 of 40 P-1 Line #4 Volume 1 - 98 === page 177 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / PL010 - IMAGING ISIS TECHNICAL INSERTION (SWFTS) MDAP/MAIS Code: Modification Item 1 of 1: PL010 - IMAGING ISIS TECHNICAL INSERTION (SWFTS) Installation Information Method of Implementation: AIT:: Installation Name: VA TECHNICAL INSERTION with MAST COMPATIBILITY (SWFTS) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 13 / 11.548 Prior Years 2 / 2.098 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 15 / 13.646 FY 2025 - / - - / - 1 / 1.070 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 1.070 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - 1 / 1.135 - / - - / - 0 / 0.000 1 / 1.135 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 1.070 - / - - / - - / - - / - 1 / 1.135 - / - - / - 0 / 0.000 Total 13 / 11.548 2 / 2.098 17 / 15.851 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 13 - - - 2 - - - 1 - - - - - - - - - - - 1 - - - - - - - - - 17 Out 13 - - - 2 - - - 1 - - - - - - - - - - - 1 - - - - - - - - - 17 Method of Implementation: AIT:: Installation Name: VA TECHNICAL INSERTION without MAST COMPATIBILITY (SWFTS) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 6 / 4.970 4 / 3.736 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 10 / 8.706 FY 2025 - / - - / - 3 / 2.859 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 3 / 2.859 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2027 - / - - / - - / - 4 / 3.888 0 / 0.000 4 / 3.888 4 / 3.964 - / - - / - - / - 0 / 0.000 8 / 7.852 FY 2028 - / - - / - - / - - / - - / - - / - - / - 4 / 4.044 - / - - / - 0 / 0.000 4 / 4.044 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 7 / 7.217 - / - 0 / 0.000 7 / 7.217 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 5.260 0 / 0.000 5 / 5.260 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - 7 / 7.511 7 / 7.511 Installation Cost LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 11 of 40 P-1 Line #4 / - / - - / - Volume 1 - 99 === page 178 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / PL010 - IMAGING ISIS TECHNICAL INSERTION (SWFTS) MDAP/MAIS Code: Modification Item 1 of 1: PL010 - IMAGING ISIS TECHNICAL INSERTION (SWFTS) Installation Information Method of Implementation: AIT:: Installation Name: VA TECHNICAL INSERTION without MAST COMPATIBILITY (SWFTS) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) To Complete - Total 6 / 4.970 / - - / - - 4 / 3.736 / - - 3 / 2.859 / - - 4 / 3.888 / - - 0 / 0.000 / - - 4 / 3.888 / - - 4 / 3.964 / - - 4 / 4.044 / - - 7 / 7.217 / - - 5 / 5.260 / - - 7 / 7.511 / - 44 / 43.449 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 6 - - - 4 - - - 3 - - - 4 - - - 4 - - - 4 - - - 7 - - - 5 7 44 Out 6 - - - 4 - - - 3 - - - 4 - - - 4 - - - 4 - - - 7 - - - 5 7 44 Method of Implementation: AIT:: Installation Name: SSBN (OHIO) BACKFIT (SWFTS) Installation Cost Prior Years Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 14 / 1.731 3 / 0.444 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 17 / 2.175 FY 2025 - / - - / - 2 / 0.302 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 0.302 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2027 - / - - / - - / - - / - - / - - / - 1 / 0.157 - / - - / - - / - 0 / 0.000 1 / 0.157 FY 2028 - / - - / - - / - - / - - / - - / - - / - 1 / 0.160 - / - - / - 0 / 0.000 1 / 0.160 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.163 - / - 0 / 0.000 1 / 0.163 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.302 - / - - / - - / - 1 / 0.157 1 / 0.163 - / - 0 / 0.000 Total 14 / 1.731 3 / 0.444 LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 12 of 40 1 / 0.160 P-1 Line #4 / - - / - 22 / 2.957 Volume 1 - 100 === page 179 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / PL010 - IMAGING ISIS TECHNICAL INSERTION (SWFTS) MDAP/MAIS Code: Modification Item 1 of 1: PL010 - IMAGING ISIS TECHNICAL INSERTION (SWFTS) Installation Information Method of Implementation: AIT:: Installation Name: SSBN (OHIO) BACKFIT (SWFTS) Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 14 - - - 3 - - - 2 - - - - - - - 1 - - - 1 - - - 1 - - - - - 22 Out 14 - - - 3 - - - 2 - - - - - - - 1 - - - 1 - - - 1 - - - - - 22 Method of Implementation: AIT:: Installation Name: SSBN (COLUMBIA) TECHNICAL INSERTION (SWFTS) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 1.031 - / - 0 / 0.000 1 / 1.031 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 1.052 0 / 0.000 1 / 1.052 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 1.073 1 / 1.073 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - - / - - / - - / - - / - - / - - / - - / - 1 / 1.031 Installation Cost 1 / 1.052 / - - 1 / 1.073 / - 3 / 3.156 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - - - - - - - 1 - - - 1 1 3 Out - - - - - - - - - - - - - - - - - - - - - - - - 1 - - - 1 1 3 Footnotes: (3) The VA TI with Mast Compatibility (MC) kit is a one-time critical modernization hardware upgrade required for every VA platform and includes funding for the procurement of the Common Electrical Hull Penetrator and Common Dip Loop which is required for TI-16 and beyond installations. The Common Electrical Hull Penetrator and Common Dip Loop provides the required interface for current photonics masts, including the LPPM and supports all future mast types. As a result, unit cost is higher than VA TI without MC. LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 13 of 40 P-1 Line #4 Volume 1 - 101 === page 180 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / PL010 - IMAGING ISIS TECHNICAL INSERTION (SWFTS) MDAP/MAIS Code: (4) FY27 funding provides backfill for four VA TI kits originally planned for FY26 in support of maintaining SWFTS installation profile. VA Technical Insertion without Mast Compatibility (MC), documented in 1.1.3 procures hardware required for TI installations on platforms which have already received the Common Electrical Hull Penetrator and Common Dip Loop during a prior modernization or during new construction. Unit cost is higher than 688/21 TI due to greater processing and larger footprint. LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 14 of 40 P-1 Line #4 Volume 1 - 102 === page 181 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 2 / PL011 IMAGING UPGRADES: TYPE 8/TYPE 18 MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 3.785 8.148 3.856 3.852 0.000 3.852 3.861 1.407 0.479 - - - - - - - - - 3.785 8.148 3.856 3.852 0.000 3.852 3.861 1.407 0.479 - - - - - - - - - 3.785 8.148 3.856 3.852 0.000 3.852 3.861 1.407 0.479 To FY 2031 Complete - Total - 0.488 Continuing - Continuing - 0.488 Continuing - Continuing - - 0.488 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Provides the procurement and installation of obsolescence related upgrades for Submarine Periscopes. One (1) set includes variable quantities and types based on Fleet-endorsed requirements. Procures and installs the Infrared (IR) Collision Avoidance System for the SSBN (OHIO) Class submarines. LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 15 of 40 P-1 Line #4 Volume 1 - 103 === page 182 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: TYPE 8/TYPE 18 Related RDT&E PEs: 0604777N Modification Type: ORDALT Prior Years Financial Plan Modification Number / Title: 2 / PL011 IMAGING UPGRADES: TYPE 8/TYPE 18 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: PL011 IMAGING UPGRADES: TYPE 8/TYPE 18 B Kits Recurring 1.1.1) TYPE 8/TYPE 18 - NonOrganic 75 / 2.769 1.1.2) SSBN OHIO Collision Avoidance Infrared (IR) NonOrganic - (5) Subtotal: Recurring Subtotal: PL011 IMAGING UPGRADES: TYPE 8/TYPE 18 Subtotal: Procurement, All Modification Items / / 2.769 - - 75 / 2.769 - 1 / 0.294 1 / 0.300 1 / 0.306 - / - 1 / 0.306 1 / 0.312 1 / 0.318 1 / 0.324 1 / 0.330 8 / 4.200 - - / - - / - - - - - - / 4.494 - 9 / 4.494 / / 0.300 - 1 / 0.300 / 0.306 - / - 1 / 0.306 - / - - / / 0.306 - 1 / 0.306 / / 0.312 - 1 / 0.312 / / 0.318 / 2.769 - / 4.494 - / 0.300 - / 0.306 - / - - / 0.306 - / 0.312 - / 0.318 / 0.324 - 1 / 0.318 / - / 0.324 - - Continuing / - 8 / 4.200 / 0.330 Continuing Continuing 1 / 0.330 Continuing Continuing / 0.330 Continuing Continuing - 1 / 0.324 Continuing / - - Support (All Modification Items) 2.1) SSBN OHIO Collision Avoidance (IR) / - - / 3.514 - / 3.013 - / 2.788 - / - - / 2.788 - / 2.776 - / 0.937 - / - - / - / - - / 13.028 - / 0.000 - / 3.514 - / 3.013 - / 2.788 - / - - / 2.788 - / 2.776 - / 0.937 - / - - / - - / 0.000 - / 13.028 Modification Item 1 of 1: PL011 IMAGING UPGRADES: TYPE 8/TYPE 18 - / 1.016 - / 0.140 - / 0.543 - / 0.758 / 0.000 - / 0.758 - / 0.773 - / 0.152 - / 0.155 - / 0.158 - / 0.161 - / 3.856 Subtotal: Installation - / 1.016 - / 0.140 - / 0.543 - / 0.758 / - - / 0.758 - / 0.773 - / 0.152 - / 0.155 - / 0.158 - / 0.161 - / 3.856 0.488 Continuing Subtotal: Support - - Installation - Total Total Cost (Procurement + Support + Installation) 3.785 LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy 8.148 3.856 3.852 0.000 UNCLASSIFIED Page 16 of 40 3.852 3.861 1.407 P-1 Line #4 0.479 Continuing Volume 1 - 104 === page 183 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / PL011 IMAGING UPGRADES: TYPE 8/TYPE 18 MDAP/MAIS Code: Modification Item 1 of 1: PL011 IMAGING UPGRADES: TYPE 8/TYPE 18 Manufacturer Information Manufacturer Name: Multiple Vendors (TYPE 8/TYPE 18) Manufacturer Location: Various Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 14 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2025 Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Delivery Dates May 2026 May 2027 May 2028 May 2029 May 2030 May 2031 May 3032 FY 2030 FY 2031 Manufacturer Name: TBD (SSBN OHIO Collision Avoidance IR) Manufacturer Location: Various (6) Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 12 Dates FY 2025 Contract Dates Mar 2025 Delivery Dates Mar 2026 FY 2026 FY 2027 FY 2028 FY 2029 Installation Information Method of Implementation: AIT:: Installation Name: TYPE 8/TYPE 18 Installation Cost Prior Years Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 74 / 1.016 1 / 0.140 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 75 / 1.156 FY 2025 - / - - / - 1 / 0.143 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 0.143 FY 2026 - / - - / - - / - 1 / 0.146 0 / 0.000 1 / 0.146 - / - - / - - / - - / - 0 / 0.000 1 / 0.146 FY 2027 - / - - / - - / - - / - - / - - / - 1 / 0.149 - / - - / - - / - 0 / 0.000 1 / 0.149 FY 2028 - / - - / - - / - - / - - / - - / - - / - 1 / 0.152 - / - - / - 0 / 0.000 1 / 0.152 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.155 - / - 0 / 0.000 1 / 0.155 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.158 0 / 0.000 1 / 0.158 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.161 1 / 0.161 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total 74 / 1.016 1 / 0.140 LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy 1 / 0.143 1 / 0.146 0 / 0.000 UNCLASSIFIED Page 17 of 40 1 / 0.146 1 / 0.149 1 / 0.152 P-1 Line #4 1 / 0.155 1 / 0.158 / - 1 / 0.161 - / - 82 / 2.220 Volume 1 - 105 === page 184 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / PL011 IMAGING UPGRADES: TYPE 8/TYPE 18 MDAP/MAIS Code: Modification Item 1 of 1: PL011 IMAGING UPGRADES: TYPE 8/TYPE 18 Installation Information Method of Implementation: AIT:: Installation Name: TYPE 8/TYPE 18 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 74 - - 1 - - - 1 - - - 1 - - - 1 - - - 1 - - - 1 - - - 1 - 1 82 Out 74 - - 1 - - - 1 - - - 1 - - - 1 - - - 1 - - - 1 - - - 1 - 1 82 Method of Implementation: AIT:: Installation Name: SSBN OHIO Collision Avoidance Infrared (IR) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - - / - - / - - / - - / - - FY 2025 - / - - / - 2 / 0.400 3 / 0.612 0 / 0.000 3 / 0.612 3 / 0.624 - / - - / - - / - 0 / 0.000 8 / 1.636 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - 2 / 0.400 3 / 0.624 - / - - / - - / - 0 / 0.000 Installation Cost / - - / - - 3 / 0.612 / - - 0 / 0.000 / - 3 / 0.612 / - - / - 8 / 1.636 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - 2 - - - 3 - - - 3 - - - - - - - - - - - - - - - 8 Out - - - - - - 2 - - - 3 - - - 3 - - - - - - - - - - - - - - - 8 Footnotes: (5) Funding required in FY25 to procure QTY (8) Infrared (IR) Collision Avoidance Systems for 8 SSBN (OHIO) Class submarines. This new capability will increase situational awareness for SSBNs when operating at periscope depth, thereby improving submarine safety, stealth, and security. All 8 systems will be procured in FY25 to realize quantity cost savings and installed over the following 3 years as platform schedules allow. LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 18 of 40 P-1 Line #4 Volume 1 - 106 === page 185 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog ID Code (A=Service Ready, B=Not Service Ready) : (6) Modification Number / Title: 2 / PL011 IMAGING UPGRADES: TYPE 8/TYPE 18 MDAP/MAIS Code: One time buy in FY25 realizes quantity cost savings in support of installations planned for FY26/27/28. LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 19 of 40 P-1 Line #4 Volume 1 - 107 === page 186 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 3 / PL025 LOW PROFILE IMAGING MAST MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 44.238 40.657 39.864 0.000 39.864 51.415 52.443 42.536 127.459 127.459 - - - - - - - - 44.238 40.657 39.864 0.000 39.864 51.415 52.443 42.536 127.459 - - - - - - - - 44.238 40.657 39.864 0.000 39.864 51.415 52.443 42.536 To FY 2031 Complete 43.386 Continuing - Continuing - 43.386 Continuing - Total - Continuing - - 43.386 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: VA and CLB Class advanced low profile imaging masts including Low Profile Photonics Mast (LPPM), Type 20, Type 24 and Type 2S masts. Procures and installs initial modernization assets as well as spare masts to maintain overall spares ratio for photonics masts as quantity of VA and CLB Class submarines increase and special support tooling to enable the maintenance and repair of such masts at Regional Repair Centers. Maintaining sufficient quantities of installed and spare low profile imaging masts is essential to meet Fleet requirements for all deploying VA and CLB class submarines to be equipped with low profile imaging masts. Procure support equipment to allow repair of low profile masts at Regional Repair Centers which reduces Mean Time to Repair, thereby increasing Operational Availability of Low Profile Masts to meet Fleet requirements. Includes equipment comprising of module test set, alignment fixtures, test equipment, and repair tooling. PL025 funds Mast Capability Enhancements (MCE) and System for Non-Acoustics Control of Signatures (SNACS) capabilities to provide advanced sensitive mast technologies to improve tactical operations and reduce the risk of counter detection. LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 20 of 40 P-1 Line #4 Volume 1 - 108 === page 187 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Photonics Mast Related RDT&E PEs: 0604777N Modification Type: SHIPALT Prior Years Financial Plan Modification Number / Title: 3 / PL025 LOW PROFILE IMAGING MAST FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: PL025 LOW PROFILE IMAGING MAST B Kits Recurring 1.1.1) TYPE 20 MAST - NonOrganic 8 / 76.196 1.1.2) TYPE 24 MAST - NonOrganic 1.1.3) TYPE 2S MAST - NonOrganic 1.1.4) MAST CAPABILITY ENHANCEMENT NonOrganic Subtotal: PL025 LOW PROFILE IMAGING MAST Subtotal: Procurement, All Modification Items / - - / - - / 81.590 - / - - 2 / 20.262 - 12 / 5.394 (7) Subtotal: Recurring - / - - 6 / 2.778 / 23.040 - 20 / 81.590 / - - 2 / 20.668 / - - / - 2 / 21.082 - / - / - - 6 / 2.832 / 23.500 - 8 / 23.040 / - / - - / - - 6 / 2.886 - / - 6 / 2.886 / 23.968 - / - 8 / 23.968 - / - - 8 / 23.500 - - 2 / 21.082 / - / 23.968 - / - - 3 / 32.256 - / - - / - - / - - / - 8 / 76.196 3 / 32.901 - / - - / - - / - 12 / 127.169 / - - 6 / 2.946 / 35.202 - 8 / 23.968 2 / 22.372 2 / 22.820 Continuing Continuing 6 / 3.066 6 / 3.126 Continuing Continuing / 35.907 - 9 / 35.202 / - 6 / 3.006 / 25.438 - 9 / 35.907 / 25.946 Continuing Continuing 8 / 25.946 Continuing Continuing - 8 / 25.438 - / 81.590 - / 23.040 - / 23.500 - / 23.968 - / - - / 23.968 - / 35.202 - / 35.907 - / 25.438 - / 25.946 Continuing Continuing 2.1) LPM NRE - / 44.555 - / 20.262 - / 16.845 - / 15.142 - / - - / 15.142 - / 15.445 - / 15.754 - / 16.069 - / 16.390 Continuing Continuing Subtotal: Support - / 44.555 - / 20.262 - / 16.845 - / 15.142 - / - - / 15.142 - / 15.445 - / 15.754 - / 16.069 - / 16.390 Continuing Continuing Support (All Modification Items) Installation Modification Item 1 of 1: PL025 LOW PROFILE IMAGING MAST - / 1.314 - / 0.936 - / 0.312 - / 0.754 Subtotal: Installation - / 1.314 - / 0.936 - / 0.312 - / 0.754 - / 0.000 - / 0.754 - / 0.768 - / 0.782 - / 1.029 - / 1.050 - / 1.321 - / 8.266 / - - / 0.754 - / 0.768 - / 0.782 - / 1.029 - / 1.050 - / 1.321 - / 8.266 43.386 Continuing - Total Total Cost (Procurement + Support + Installation) 127.459 LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy 44.238 40.657 39.864 0.000 UNCLASSIFIED Page 21 of 40 39.864 51.415 52.443 P-1 Line #4 42.536 Continuing Volume 1 - 109 === page 188 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / PL025 LOW PROFILE IMAGING MAST MDAP/MAIS Code: Modification Item 1 of 1: PL025 LOW PROFILE IMAGING MAST Manufacturer Information Manufacturer Name: L3 KEO (TYPE 24 Single-Source Procurement) Manufacturer Location: Northampton, MA Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 24 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Sep 2025 Mar 2026 Mar 2027 Mar 2028 Mar 2029 Delivery Dates Sep 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Manufacturer Name: Various (MCE) FY 2030 FY 2031 Manufacturer Location: Various Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2025 Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Delivery Dates Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Mar 2032 Manufacturer Name: TBD (TYPE 2S Competitive Procurement) Manufacturer Location: TBD (Competitive Procurement) Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 24 FY 2025 FY 2026 FY 2027 FY 2030 FY 2031 Contract Dates FY 2028 FY 2029 Mar 2030 Mar 2031 Delivery Dates Mar 2032 Mar 2033 Installation Information Method of Implementation: AIT:: Installation Name: TYPE 20 MAST Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 5 / 1.014 3 / 0.630 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 8 / 1.644 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 5 / 1.014 3 / 0.630 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Installation Cost LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 22 of 40 P-1 Line #4 8 / 1.644 Volume 1 - 110 === page 189 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / PL025 LOW PROFILE IMAGING MAST MDAP/MAIS Code: Modification Item 1 of 1: PL025 LOW PROFILE IMAGING MAST Installation Information Method of Implementation: AIT:: Installation Name: TYPE 20 MAST Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 5 - 1 1 1 - - - - - - - - - - - - - - - - - - - - - - - - - 8 Out 5 - 1 1 1 - - - - - - - - - - - - - - - - - - - - - - - - - 8 Method of Implementation: AIT:: Installation Name: TYPE 24 MAST Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - - / - - / - - / - - / - - / - - FY 2025 - / - - / - - / - 2 / 0.436 0 / 0.000 2 / 0.436 - / - - / - - / - - / - 0 / 0.000 2 / 0.436 FY 2026 - / - - / - - / - - / - - / - - / - 2 / 0.444 - / - - / - - / - 0 / 0.000 2 / 0.444 FY 2027 - / - - / - - / - - / - - / - - / - - / - 2 / 0.452 - / - - / - 0 / 0.000 2 / 0.452 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - 3 / 0.693 - / - 0 / 0.000 3 / 0.693 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 0.708 0 / 0.000 3 / 0.708 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - 2 / 0.436 Installation Cost / - - / - 0 / 0.000 2 / 0.436 2 / 0.444 2 / 0.452 3 / 0.693 3 / 0.708 / - - 0 / 0.000 / - 12 / 2.733 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - 2 - 1 1 - - 1 1 - - 1 1 1 - 1 1 1 - 12 Out - - - - - - - - - - - - 2 - 1 1 - - 1 1 - - 1 1 1 - 1 1 1 - 12 LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 23 of 40 P-1 Line #4 Volume 1 - 111 === page 190 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / PL025 LOW PROFILE IMAGING MAST MDAP/MAIS Code: Modification Item 1 of 1: PL025 LOW PROFILE IMAGING MAST Installation Information Method of Implementation: AIT:: Installation Name: TYPE 2S MAST Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.481 2 / 0.481 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.491 2 / 0.491 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.972 Installation Cost / - - / - 4 / 0.972 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4 4 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4 4 Method of Implementation: [none specified]:: Installation Name: MAST CAPABILITY ENHANCEMENT Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 6 / 0.300 6 / 0.306 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 12 / 0.606 FY 2025 - / - - / - 6 / 0.312 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 6 / 0.312 FY 2026 - / - - / - - / - 6 / 0.318 0 / 0.000 6 / 0.318 - / - - / - - / - - / - 0 / 0.000 6 / 0.318 FY 2027 - / - - / - - / - - / - - / - - / - 6 / 0.324 - / - - / - - / - 0 / 0.000 6 / 0.324 FY 2028 - / - - / - - / - - / - - / - - / - - / - 6 / 0.330 - / - - / - 0 / 0.000 6 / 0.330 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 6 / 0.336 - / - 0 / 0.000 6 / 0.336 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 6 / 0.342 0 / 0.000 6 / 0.342 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - 6 / 0.349 6 / 0.349 Installation Cost LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 24 of 40 P-1 Line #4 / - Volume 1 - 112 === page 191 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / PL025 LOW PROFILE IMAGING MAST MDAP/MAIS Code: Modification Item 1 of 1: PL025 LOW PROFILE IMAGING MAST Installation Information Method of Implementation: [none specified]:: Installation Name: MAST CAPABILITY ENHANCEMENT Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) To Complete - Total 6 / 0.300 / - - / - - 6 / 0.306 / - - 6 / 0.312 / - - 6 / 0.318 / - - 0 / 0.000 / - - 6 / 0.318 / - - 6 / 0.324 / - - 6 / 0.330 / - - 6 / 0.336 / - - 6 / 0.342 / - - 6 / 0.349 / - 54 / 2.917 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 6 - 2 2 2 - 2 2 2 - 2 2 2 - 2 2 2 - 2 2 2 - 2 2 2 - 2 2 2 6 54 Out 6 - 2 2 2 - 2 2 2 - 2 2 2 - 2 2 2 - 2 2 2 - 2 2 2 - 2 2 2 6 54 Footnotes: (7) Mast Capability Enhancement (MCE) back-fits legacy photonics masts to provide advanced sensitive technologies for tactical operations. LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 25 of 40 P-1 Line #4 Volume 1 - 113 === page 192 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 4 / ML007 CADF (SWFTS) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 46.764 13.156 1.124 29.648 0.000 29.648 22.107 25.813 29.656 - - - - - - - - - 46.764 13.156 1.124 29.648 0.000 29.648 22.107 25.813 29.656 - - - - - - - - - 46.764 13.156 1.124 29.648 0.000 29.648 22.107 25.813 29.656 To FY 2031 Complete 30.555 Continuing - Continuing - 30.555 Continuing - Total - Continuing - - 30.555 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Provides advanced low-band Direction Finding (DF) capability compatible with the AN/BLQ-10 EW system. The ICADF system is experiencing increasing failures and obsolescence issues shown in Operation Availability and Reliability, Maintainability, Availability analyses. Beginning in FY22 with TI-22, the ICADF system will be replaced by a new CADF solution integrated with the AN/BLQ-10 system. This new CADF solution uses server-based technology to replace obsolete and unsupportable analog systems. This upgrade is part of the drive to digitize the submarine EW systems which allows these systems to be upgraded more rapidly and cheaply through software solutions. This cost code incorporates the CADF equipment with the AN/BLQ-10 equipment in ML012. Therefore, CADF is a part of the SWFTS TI shipset and must be procured and installed in like quantities (except EW SSBN (OHIO) Class) across all PARMs to maintain the SWFTS model. EW does not do upgrades on SSBN (OHIO) Class ships. This is the only SWFTS subsystem that does not participate in SSBN (OHIO) TI/APB upgrades. LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 26 of 40 P-1 Line #4 Volume 1 - 114 === page 193 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: CADF Related RDT&E PEs: 0604503N Modification Type: SHIPALT Prior Years Financial Plan Modification Number / Title: 4 / ML007 CADF (SWFTS) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: ML007 CADF (SWFTS) B Kits Recurring 1.1.1) CADF - NonOrganic (8) Subtotal: Recurring Subtotal: ML007 CADF (SWFTS) Subtotal: Procurement, All Modification Items 18 / 44.224 / 44.224 - 18 / 44.224 / 44.224 - 4 / 10.956 - / - 10 / 28.500 - / - 10 / 28.500 / 10.956 - / - - / 28.500 - / - - 4 / 10.956 - / - 10 / 28.500 - / - 10 / 28.500 / 10.956 - / - - / 28.500 - / - - - - / 28.500 / 28.500 7 / 20.349 / 20.349 - 8 / 23.720 7 / 20.349 / 20.349 - / 23.720 - 9 / 27.216 8 / 23.720 / 23.720 - / 27.216 - 9 / 27.216 / 27.216 - 9 / 27.756 Continuing Continuing / 27.756 Continuing Continuing 9 / 27.756 Continuing Continuing / 27.756 Continuing Continuing - - Installation Modification Item 1 of 1: ML007 CADF (SWFTS) - / 2.540 - / 2.200 - / 1.124 - / 1.148 Subtotal: Installation - / 2.540 - / 2.200 - / 1.124 - / 1.148 - / 0.000 - / 1.148 - / 1.758 - / 2.093 - / 2.440 - / 2.799 - / 2.854 - / 18.956 / - - / 1.148 - / 1.758 - / 2.093 - / 2.440 - / 2.799 - / 2.854 - / 18.956 30.555 Continuing - Total Total Cost (Procurement + Support + Installation) 46.764 LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy 13.156 1.124 29.648 0.000 UNCLASSIFIED Page 27 of 40 29.648 22.107 25.813 P-1 Line #4 29.656 Continuing Volume 1 - 115 === page 194 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / ML007 CADF (SWFTS) MDAP/MAIS Code: Modification Item 1 of 1: ML007 CADF (SWFTS) Manufacturer Information Manufacturer Name: Lockheed Martin Manufacturer Location: Syracuse, NY Administrative Leadtime (in Months): 4 Production Leadtime (in Months): 18 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jul 2026 Jul 2027 Jul 2028 Jul 2029 Jul 2030 Jul 2031 Jul 2032 Installation Information Method of Implementation: AIT:: Installation Name: CADF Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 10 / 2.540 Prior Years 8 / 2.200 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 18 / 4.740 FY 2025 - / - - / - 4 / 1.124 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 4 / 1.124 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2027 - / - - / - - / - 4 / 1.148 0 / 0.000 4 / 1.148 6 / 1.758 - / - - / - - / - 0 / 0.000 10 / 2.906 FY 2028 - / - - / - - / - - / - - / - - / - - / - 7 / 2.093 - / - - / - 0 / 0.000 7 / 2.093 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 8 / 2.440 - / - 0 / 0.000 8 / 2.440 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 9 / 2.799 0 / 0.000 9 / 2.799 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 9 / 2.854 9 / 2.854 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total 10 / 2.540 8 / 2.200 4 / 1.124 4 / 1.148 0 / 0.000 4 / 1.148 6 / 1.758 7 / 2.093 8 / 2.440 9 / 2.799 / - - / - - 9 / 2.854 / - / - 65 / 18.956 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 10 - - - 8 - - - 4 - - - 4 - - - 6 - - - 7 - - - 8 - - - 9 9 65 Out 10 - - - 8 - - - 4 - - - 4 - - - 6 - - - 7 - - - 8 - - - 9 9 65 Footnotes: (8) FY27 funding provides backfill for four VA TI kits originally planned for FY26 in support of maintaining SWFTS installation profile. LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 28 of 40 P-1 Line #4 Volume 1 - 116 === page 195 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 5 / ML012 - AN/BLQ-10 TECHNICAL INSERTION (SWFTS) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 47.592 9.596 84.638 0.000 84.638 68.421 80.126 92.272 96.768 24.318 137.882 137.882 - - - - - - - - - - 47.592 9.596 84.638 0.000 84.638 68.421 80.126 92.272 96.768 24.318 137.882 To FY 2031 Complete - - - - - - - - - - 47.592 9.596 84.638 0.000 84.638 68.421 80.126 92.272 96.768 24.318 Total 641.613 641.613 641.613 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Procures and installs the AN/BLQ-10 EW system for installation on LOS ANGELES, SEAWOLF, VIRGINIA, and COLUMBIA SSBN Class submarines beginning with TI-20. AN/BLQ-10 achieves EW superiority through hardware and software updates to pace the threat and brings EW fully onto the SWFTS model. Tech insertion procures the hardware necessary to upgrade and back-fit EW systems. This system will be fully aligned with SWFTS with the exception of SSBN (OHIO) Class and provides capabilities required by the EW Capability Development Document (CDD). Starting with TI-20, the AN/BLQ-10 is a more complex design over previous system resulting in a higher unit cost. NRE costs have been broken out from shipset costs consistent with the other SWFTS subsystems (SSN Acoustic Equipment, SSN Combat Control Systems, and Imaging Systems) who use the SWFTS model. This line item aligns the AN/BLQ-10 equipment with the Submarine Warfare Federated Tactical System (SWFTS) PMS401 (BLI 2150) acoustic and PMS425 (BLI 5420) combat control upgrades, as well as Imaging equipment in PL010 and CADF equipment in ML007 of this budget line item. SWFTS TI shipsets must be procured and installed in like quantities (except EW SSBN (OHIO) Class) across all PARMs to maintain the SWFTS model. EW does not do upgrades on SSBN (OHIO) Class ships. This is the only SWFTS subsystem that does not participate in SSBN (OHIO) TI/APB upgrades. LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 29 of 40 P-1 Line #4 Volume 1 - 117 === page 196 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / ML012 - AN/BLQ-10 TECHNICAL INSERTION (SWFTS) MDAP/MAIS Code: Models of Systems Affected: TECHNICAL INSERTION Related RDT&E PEs: 0604503N Modification Type: SHIPALT Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: ML012 - AN/BLQ-10 TECHNICAL INSERTION (SWFTS) A Kits Recurring 1.1.1) TI 688/21 Class - NonOrganic 12 / 76.948 (9) 6 / 39.240 1.1.2) TI VA Class - NonOrganic 1.1.3) TI SSBN CLB Class - NonOrganic Subtotal: Recurring Subtotal: ML012 - AN/BLQ-10 TECHNICAL INSERTION (SWFTS) Subtotal: Procurement, All Modification Items - / 116.188 - - / - - / - 2 / 14.970 - / - 2 / 14.970 2 / 15.270 - / - 8 / 59.880 - / - 8 / 59.880 5 / 38.175 / - - / - / - - / - / 28.776 - / - - / 74.850 - / - - 4 / 28.776 - / - 10 / 74.850 - / - 10 / 74.850 - / - - / 74.850 - / - - - 18 / 116.188 - / - 4 / 28.776 / 116.188 - / 28.776 - - / - / 74.850 - - / - / 53.445 - 7 / 53.445 / - 3 / 23.832 1 / 8.103 - / - 20 / 139.123 7 / 54.516 5 / 39.720 7 / 56.721 - / - 42 / 317.028 1 / 7.788 1 / 7.944 1 / 8.103 - / - / 62.304 - 8 / 62.304 / 71.496 - 9 / 71.496 / 72.927 9 / 72.927 / 74.850 - / 53.445 - / 62.304 - / 71.496 - / 72.927 / 0.000 - / - 3 / 23.835 - / 479.986 65 / 479.986 / 0.000 - / 479.986 Installation Modification Item 1 of 1: ML012 - AN/BLQ-10 TECHNICAL INSERTION (SWFTS) - / 21.694 - / 18.816 - / 9.596 - / 9.788 Subtotal: Installation - / 21.694 - / 18.816 - / 9.596 - / 9.788 - / 0.000 - / 9.788 - / 14.976 - / 17.822 - / 20.776 - / 23.841 - / 24.318 - / 161.627 / - - / 9.788 - / 14.976 - / 17.822 - / 20.776 - / 23.841 - / 24.318 - / 161.627 - Total Total Cost (Procurement + Support + Installation) 137.882 LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy 47.592 9.596 84.638 0.000 UNCLASSIFIED Page 30 of 40 84.638 68.421 80.126 P-1 Line #4 92.272 96.768 24.318 641.613 Volume 1 - 118 === page 197 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / ML012 - AN/BLQ-10 TECHNICAL INSERTION (SWFTS) MDAP/MAIS Code: Modification Item 1 of 1: ML012 - AN/BLQ-10 TECHNICAL INSERTION (SWFTS) Manufacturer Information Manufacturer Name: Lockheed Martin Manufacturer Location: Syracuse, NY Administrative Leadtime (in Months): 4 Production Leadtime (in Months): 18 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jul 2026 Jul 2027 Jul 2028 Jul 2029 Jul 2030 Jul 2031 Jul 2032 Installation Information Method of Implementation: AIT:: Installation Name: TI 688/21 Class Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 10 / 21.694 12 / 26.398 Prior Years 2 / 4.704 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - 2 / 4.992 - / - - / - - / - 0 / 0.000 2 / 4.992 FY 2028 - / - - / - - / - - / - - / - - / - - / - 2 / 5.092 - / - - / - 0 / 0.000 2 / 5.092 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 7.947 0 / 0.000 3 / 7.947 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 2.702 1 / 2.702 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - 2 / 4.704 - / - - / - - / - - / - 2 / 4.992 2 / 5.092 - / - 3 / 7.947 Total 10 / 21.694 / - - / - - 1 / 2.702 / - / - 20 / 47.131 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 10 - - - 2 - - - - - - - - - - - 2 - - - 2 - - - - - - - 3 1 20 Out 10 - - - 2 - - - - - - - - - - - 2 - - - 2 - - - - - - - 3 1 20 LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 31 of 40 P-1 Line #4 Volume 1 - 119 === page 198 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / ML012 - AN/BLQ-10 TECHNICAL INSERTION (SWFTS) MDAP/MAIS Code: Modification Item 1 of 1: ML012 - AN/BLQ-10 TECHNICAL INSERTION (SWFTS) Installation Information Method of Implementation: AIT:: Installation Name: TI VA Class Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - Prior Years - / - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 6 / 14.112 FY 2025 - / - 6 / 14.112 - / - 4 / 9.596 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 4 / 9.596 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2027 - / - - / - - / - 4 / 9.788 0 / 0.000 4 / 9.788 4 / 9.984 - / - - / - - / - 0 / 0.000 8 / 19.772 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 5 / 12.730 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 7 / 18.179 - / - 0 / 0.000 7 / 18.179 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 13.245 0 / 0.000 5 / 13.245 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / 18.914 7 / 18.914 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - 6 / 14.112 4 / 9.596 4 / 9.788 0 / 0.000 4 / 9.788 5 / 12.730 4 / 9.984 5 / 12.730 7 / 18.179 - 5 / 13.245 / - - / - / - - 7 / 18.914 / - 42 / 106.548 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - 6 - - - 4 - - - 4 - - - 4 - - - 5 - - - 7 - - - 5 7 42 Out - - - - 6 - - - 4 - - - 4 - - - 4 - - - 5 - - - 7 - - - 5 7 42 Method of Implementation: AIT:: Installation Name: TI SSBN CLB Class Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 2.597 - / - 0 / 0.000 1 / 2.597 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 2.649 0 / 0.000 1 / 2.649 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - 1 / 2.702 1 / 2.702 Installation Cost LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 32 of 40 P-1 Line #4 / - Volume 1 - 120 === page 199 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / ML012 - AN/BLQ-10 TECHNICAL INSERTION (SWFTS) MDAP/MAIS Code: Modification Item 1 of 1: ML012 - AN/BLQ-10 TECHNICAL INSERTION (SWFTS) Installation Information Method of Implementation: AIT:: Installation Name: TI SSBN CLB Class Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) To Complete - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - - / - - / - - / - - / - - / - - / - - / - 1 / 2.597 Installation Cost / - - / - - 1 / 2.649 / - - 1 / 2.702 / - 3 / 7.948 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - - - - - - - 1 - - - 1 1 3 Out - - - - - - - - - - - - - - - - - - - - - - - - 1 - - - 1 1 3 Footnotes: (9) FY27 funding provides backfill for four VA TI kits originally planned for FY26 in support of maintaining SWFTS installation profile. LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 33 of 40 P-1 Line #4 Volume 1 - 121 === page 200 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 6 / ML017 AN/BLQ-10 FIELD CHANGE KITS MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 43.524 50.033 54.935 0.000 54.935 52.161 47.638 50.276 140.361 140.361 - - - - - - - - 43.524 50.033 54.935 0.000 54.935 52.161 47.638 50.276 140.361 - - - - - - - - 43.524 50.033 54.935 0.000 54.935 52.161 47.638 50.276 To FY 2031 Complete - Total - 50.145 Continuing - Continuing - 50.145 Continuing - Continuing - - 50.145 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Procures and installs AN/BLQ-10 and subsystem Product Improvement Field Change Kits (FCK). One (1) set of AN/BLQ-10 FCKs is procured in each fiscal year that includes variable quantities and types, procured from a variety of vendors. Procures and installs MMM Payload Module antennas to support submarine Fleet required improved Unmanned Aerial System (UAS) communications and Electronic Warfare (EW) capability to meet emerging threats and provide new capabilities required by the Fleet. Procures and installs Submarine Tethered Expendable Buoy (STEB), a 3" Launcher deployed, expendable, free-floating buoy that will communicate with the submarine through a fiber-optic tether. Procures and installs the Automated Range Finder (ARF) Collision Avoidance System for SSBN (OHIO) Class submarines. This system will increase situational awareness while operating at periscope depth, improving the safety, stealth, and security of the submarine. Procures Virginia Class Mission Configurable Bay (MCB) update to receive a Multifunction Modular Mast (MMM), ensuring all SSNs can support payload required for Fleet priorities. LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 34 of 40 P-1 Line #4 Volume 1 - 122 === page 201 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / ML017 AN/BLQ-10 FIELD CHANGE KITS MDAP/MAIS Code: Models of Systems Affected: AN/BLQ-10 Related RDT&E PEs: 0604503N Modification Type: ORDALT Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: ML017 AN/BLQ-10 FIELD CHANGE KITS A Kits Recurring 1.1.1) AN/BLQ-10 FCKs - NonOrganic (10) 1.1.2) MMM Payloads - NonOrganic 13 / 91.108 1 / 12.220 1 / 12.464 30 / 35.780 1 / 12.713 - / - 1 / 12.713 1 / 12.967 1 / 13.226 1 / 13.491 1 / 13.761 Continuing Continuing 6 / 7.470 6 / 7.620 6 / 7.770 - / - 6 / 7.770 6 / 7.926 6 / 8.082 6 / 8.244 6 / 8.406 Continuing Continuing 1.1.3) Submarine Tethered Expendable Buoy (STEB) NonOrganic - / - - / - 4 / 6.100 8 / 12.448 - / - 8 / 12.448 8 / 12.696 8 / 12.952 8 / 13.208 8 / 13.472 Continuing Continuing 1.1.4) OHIO SSBN Collision Avoidance (ARF) NonOrganic - / - 1 / 1.836 2 / 3.746 2 / 3.820 - / - 2 / 3.820 1 / 1.948 - / - - / - - / - - / - 6 / 11.350 1.1.5) Mission Configurable Bay (MCB) for VA BLK I/II NonOrganic - / - 3 / 5.673 1 / 1.929 1 / 1.968 - / - 1 / 1.968 1 / 2.007 - / - 2 / 4.176 - / - - / - 8 / 15.753 Subtotal: Recurring Subtotal: ML017 AN/BLQ-10 FIELD CHANGE KITS Subtotal: Procurement, All Modification Items - / 126.888 43 / 126.888 11 / 27.199 / 126.888 - 2.1) STEB Support - / - - 2.2) OHIO SSBN Collision Avoidance (ARF) Support - / - - / 27.199 - / 27.199 / 31.859 - 14 / 31.859 / 31.859 - / 38.719 - / - - 18 / 38.719 - / - 18 / 38.719 / 38.719 - / - - - - / 38.719 / 38.719 / 37.544 - 17 / 37.544 / 37.544 - / 34.260 - 15 / 34.260 / 34.260 - / 39.119 - 17 / 39.119 / 39.119 - / 35.639 Continuing Continuing 15 / 35.639 Continuing Continuing / 35.639 Continuing Continuing / 6.969 Continuing Continuing - - Support (All Modification Items) / 10.313 - / 7.837 - / 7.538 - / - - / 7.538 - / 6.567 - / 6.698 / 4.493 - / 4.335 - / 3.979 - / - - / 3.979 - / 1.985 - / 0.717 - / - - / - - / - / - - / - / - - / - - / - - / - / 11.517 - / - - 2.3) MMM Support - / 5.000 - / - Subtotal: Support - / 5.000 Modification Item 1 of 1: ML017 AN/BLQ-10 FIELD CHANGE KITS - / 8.473 - / 1.519 - / 6.002 - / 4.699 Subtotal: Installation - / 8.473 - / 1.519 - / 6.002 - / 4.699 / 14.806 - - / - / 12.172 - - - / - - / - - - / 6.832 - - / 15.509 - / 5.000 / 11.517 - / 8.552 - / 7.415 - / 6.832 - / 6.969 Continuing Continuing Installation - / 0.000 - / 4.699 - / 6.065 - / 5.963 - / 4.325 - / 7.537 - / 3.668 - / 48.251 / - - / 4.699 - / 6.065 - / 5.963 - / 4.325 - / 7.537 - / 3.668 - / 48.251 50.145 Continuing - Total Total Cost (Procurement + Support + Installation) 140.361 LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy 43.524 50.033 54.935 0.000 UNCLASSIFIED Page 35 of 40 54.935 52.161 47.638 P-1 Line #4 50.276 Continuing Volume 1 - 123 === page 202 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / ML017 AN/BLQ-10 FIELD CHANGE KITS MDAP/MAIS Code: Modification Item 1 of 1: ML017 AN/BLQ-10 FIELD CHANGE KITS Manufacturer Information Manufacturer Name: Multiple Vendors Manufacturer Location: Various Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 6 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2024 Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Delivery Dates Jun 2025 Jun 2026 Jun 2027 Jun 2028 Jun 2029 Jun 2030 Jun 2031 Manufacturer Name: Seacorp (MMM Payloads) Manufacturer Location: Newport, RI Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2025 Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Delivery Dates Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Mar 2032 Manufacturer Name: General Dynamics Mission Systems (STEB) Manufacturer Location: Manassas, VA Administrative Leadtime (in Months): 6 Dates FY 2025 Production Leadtime (in Months): 12 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Delivery Dates Mar 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Mar 2032 FY 2030 FY 2031 FY 2030 FY 2031 Manufacturer Name: Lockheed Martin (ARF Collision Avoidance System) Manufacturer Location: Syracuse, NY Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Mar 2025 Mar 2026 Mar 2027 Mar 2028 Delivery Dates Mar 2026 Mar 2027 Mar 2028 Manufacturer Name: Lockheed Martin (MCB) FY 2029 Mar 2029 Manufacturer Location: Syracuse, NY Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Mar 2025 Mar 2026 Mar 2027 Mar 2028 Mar 2030 Delivery Dates Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2031 LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 36 of 40 FY 2029 P-1 Line #4 Volume 1 - 124 === page 203 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / ML017 AN/BLQ-10 FIELD CHANGE KITS MDAP/MAIS Code: Modification Item 1 of 1: ML017 AN/BLQ-10 FIELD CHANGE KITS Installation Information Method of Implementation: AIT:: Installation Name: AN/BLQ-10 FCKs Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - Prior Years / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 13 / 5.481 FY 2025 13 / 5.481 - / - 1 / 0.727 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 0.727 FY 2026 - / - - / - 1 / 0.742 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 0.742 FY 2027 - / - - / - - / - 1 / 0.757 0 / 0.000 1 / 0.757 - / - - / - - / - - / - 0 / 0.000 1 / 0.757 FY 2028 - / - - / - - / - - / - - / - - / - 1 / 0.772 - / - - / - - / - 0 / 0.000 1 / 0.772 FY 2029 - / - - / - - / - - / - - / - - / - - / - 1 / 0.787 - / - - / - 0 / 0.000 1 / 0.787 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.803 - / - 0 / 0.000 1 / 0.803 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.819 0 / 0.000 1 / 0.819 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - - Total 13 / 5.481 1 / 0.727 1 / 0.742 1 / 0.757 0 / 0.000 1 / 0.757 1 / 0.772 1 / 0.787 1 / 0.803 / - 1 / 0.819 / - - 0 / 0.000 / - 20 / 10.888 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 13 - - 1 - - - 1 - - - 1 - - - 1 - - - 1 - - - 1 - - - 1 - - 20 Out 13 - - 1 - - - 1 - - - 1 - - - 1 - - - 1 - - - 1 - - - 1 - - 20 Method of Implementation: AIT:: Installation Name: MMM Payloads Installation Cost Prior Years Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 24 / 2.992 6 / 0.792 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 30 / 3.784 FY 2025 - / - - / - 6 / 0.810 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 6 / 0.810 FY 2026 - / - - / - - / - 6 / 0.828 0 / 0.000 6 / 0.828 - / - - / - - / - - / - 0 / 0.000 6 / 0.828 FY 2027 - / - - / - - / - - / - - / - - / - 6 / 0.846 - / - - / - - / - 0 / 0.000 6 / 0.846 FY 2028 - / - - / - - / - - / - - / - - / - - / - 6 / 0.864 - / - - / - 0 / 0.000 6 / 0.864 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 6 / 0.882 - / - 0 / 0.000 6 / 0.882 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 6 / 0.900 0 / 0.000 6 / 0.900 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - 6 / 0.918 6 / 0.918 LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 37 of 40 P-1 Line #4 / - Volume 1 - 125 === page 204 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / ML017 AN/BLQ-10 FIELD CHANGE KITS MDAP/MAIS Code: Modification Item 1 of 1: ML017 AN/BLQ-10 FIELD CHANGE KITS Installation Information Method of Implementation: AIT:: Installation Name: MMM Payloads Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) To Complete - Total / - - 24 / 2.992 / - - 6 / 0.792 / - - 6 / 0.810 / - - 6 / 0.828 / - - 0 / 0.000 / - - 6 / 0.828 / - - 6 / 0.846 / - - 6 / 0.864 / - - 6 / 0.882 / - - 6 / 0.900 / - - 6 / 0.918 / - 72 / 9.832 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 24 - 2 2 2 - 2 2 2 - 2 2 2 - 2 2 2 - 2 2 2 - 2 2 2 - 2 2 2 6 72 Out 24 - 2 2 2 - 2 2 2 - 2 2 2 - 2 2 2 - 2 2 2 - 2 2 2 - 2 2 2 6 72 Method of Implementation: AIT:: Installation Name: Submarine Tethered Expendable Buoy (STEB) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - 4 / 1.248 0 / 0.000 4 / 1.248 - / - - / - - / - - / - 0 / 0.000 4 / 1.248 FY 2027 - / - - / - - / - - / - - / - - / - 8 / 2.544 - / - - / - - / - 0 / 0.000 8 / 2.544 FY 2028 - / - - / - - / - - / - - / - - / - - / - 8 / 2.592 - / - - / - 0 / 0.000 8 / 2.592 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 8 / 2.640 - / - 0 / 0.000 8 / 2.640 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 8 / 2.696 0 / 0.000 8 / 2.696 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 8 / 2.750 8 / 2.750 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - - / - - / - 4 / 1.248 Installation Cost LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy 0 / 0.000 UNCLASSIFIED Page 38 of 40 4 / 1.248 8 / 2.544 8 / 2.592 P-1 Line #4 8 / 2.640 8 / 2.696 / - 8 / 2.750 - / - 44 / 14.470 Volume 1 - 126 === page 205 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / ML017 AN/BLQ-10 FIELD CHANGE KITS MDAP/MAIS Code: Modification Item 1 of 1: ML017 AN/BLQ-10 FIELD CHANGE KITS Installation Information Method of Implementation: AIT:: Installation Name: Submarine Tethered Expendable Buoy (STEB) Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - 2 2 - - 3 3 2 - 3 3 2 - 3 3 2 - 3 3 2 8 44 Out - - - - - - - - - - 2 2 - - 3 3 2 - 3 3 2 - 3 3 2 - 3 3 2 8 44 Method of Implementation: AIT:: Installation Name: OHIO SSBN Collision Avoidance (ARF) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - - / - 1 / 0.208 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 0.208 FY 2026 - / - - / - - / - 2 / 0.424 0 / 0.000 2 / 0.424 - / - - / - - / - - / - 0 / 0.000 2 / 0.424 FY 2027 - / - - / - - / - - / - - / - - / - 2 / 0.432 - / - - / - - / - 0 / 0.000 2 / 0.432 FY 2028 - / - - / - - / - - / - - / - - / - - / - 1 / 0.220 - / - - / - 0 / 0.000 1 / 0.220 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - 1 / 0.208 1 / 0.220 - / - - / - 0 / 0.000 Installation Cost 2 / 0.424 0 / 0.000 2 / 0.424 2 / 0.432 / - - / - 6 / 1.284 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - 1 - - - 1 1 - - 1 1 - - 1 - - - - - - - - - - - 6 Out - - - - - - 1 - - - 1 1 - - 1 1 - - 1 - - - - - - - - - - - 6 LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 39 of 40 P-1 Line #4 Volume 1 - 127 === page 206 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0840 / Sub Periscope, Imaging and Supt Equip Prog Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / ML017 AN/BLQ-10 FIELD CHANGE KITS MDAP/MAIS Code: Modification Item 1 of 1: ML017 AN/BLQ-10 FIELD CHANGE KITS Installation Information Method of Implementation: [none specified]:: Installation Name: Mission Configurable Bay (MCB) for VA BLK I/II Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - - / - 3 / 4.242 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 3 / 4.242 FY 2026 - / - - / - - / - 1 / 1.442 0 / 0.000 1 / 1.442 - / - - / - - / - - / - 0 / 0.000 1 / 1.442 FY 2027 - / - - / - - / - - / - - / - - / - 1 / 1.471 - / - - / - - / - 0 / 0.000 1 / 1.471 FY 2028 - / - - / - - / - - / - - / - - / - - / - 1 / 1.500 - / - - / - 0 / 0.000 1 / 1.500 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 3.122 0 / 0.000 2 / 3.122 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - 3 / 4.242 1 / 1.500 - / - 2 / 3.122 Installation Cost 1 / 1.442 0 / 0.000 1 / 1.442 1 / 1.471 / - - / - - 0 / 0.000 / - / - 8 / 11.777 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - 1 1 1 - 1 - - - 1 - - - 1 - - - - - - - 1 1 - - 8 Out - - - - - - 1 1 1 - 1 - - - 1 - - - 1 - - - - - - - 1 1 - - 8 Footnotes: (10) AN/BLQ-10 FCKs are procured in variable quantities and types, and are bought from a variety of vendors each fiscal year. LI 0840 - Sub Periscope, Imaging and Supt Equip Pr... Navy UNCLASSIFIED Page 40 of 40 P-1 Line #4 Volume 1 - 128 === page 207 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0900 / DDG Mod Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: 0204228N Other Related Program Elements: 0604567N, 0604307N, 0204228N Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 6,077.709 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 6,077.709 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 6,077.709 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 822.065 822.065 822.065 878.787 878.787 878.787 1,000.278 - 0.000 1,000.278 - 1,000.278 - 0.000 1,000.278 - 1,000.278 0.000 1,000.278 1,126.709 1,126.709 1,126.709 1,157.505 1,157.505 1,157.505 1,255.310 1,255.310 1,255.310 To FY 2031 Complete 1,284.326 13,883.071 1,284.326 27,485.760 13,883.071 1,284.326 Total - 27,485.760 13,883.071 27,485.760 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 10.335 0.173 13.857 - 13.857 17.064 27.574 Flyaway Unit Cost ($ in Millions) - - - - - - - - 105.234 - 96.989 Continuing - - Continuing - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The DDG Modernization (DDG MOD) Program is required to upgrade the in-service Flight I, II, and IIA DDG-51 Class ships in order to keep the DDG Class relevant and operational. The DDG MOD Program is composed of a series of improvements in both Hull, Mechanical, and Electrical (HM&E) and Combat Systems. Modernization changes are aligned with New Construction design to increase commonality and capitalize on Economic Order Quantities across all programs. Beginning in FY26, the program installs the next phase of combat capability enhancements, DDG MOD 2.0, bringing Integrated Air and Missile Defense (IAMD) capability to the DDG 51 Class. In addition to the DDG MOD 1.0 HM&E and Combat Systems upgrades, DDG MOD 2.0 ships will be equipped with SLQ-32(V)7 Surface Electronic Warfare Improvement Program (SEWIP) Block III (funded in 0204228N OPN 2312 AN/SLQ-32), SPY-6(V)4 Air and Missile Defense Radar (AMDR) with updated AEGIS Baseline 10M / Ballistic Missile Defense (BMD) 6M, and High Efficiency Super-Capacity (HES-C) Chillers. DDG MOD 2.0 upgrades are planned for each ship's mid-life availability. Installation quantities starting in FY27 are as follows: DDG MOD 1.5: 1/0/0/0/0 DDG MOD DMP2: 0/1/0/0/0 DDG MOD 2.0: 0/0/2/2/2 The definitions for DDG MOD installations are listed below: HM&E Modernization: HM&E DDG MOD 1.0: HM&E + C/S DDG MOD 1.5: HM&E + C/S + SLQ-32(V)7 (SLQ-32(V)7 is funded outside of DDG MOD 2.0) DDG MOD DMP2: SPY-6(V)4 + HES-C (these hulls have already received DDG MOD 1.5 in a previous availability) DDG MOD 2.0: HM&E + C/S + SLQ-32(V)7 + SPY-6(V)4 + HES-C HM&E modernization is comprised of Commercial Off the Shelf (COTS) technologies for Ship Control and Engineering Plant Control Systems. New systems provide increased situational awareness, reduce manpower workloads, and address reliability and obsolescence challenges with legacy systems. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 1 of 72 P-1 Line #5 Volume 1 - 129 === page 208 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0900 / DDG Mod Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: 0204228N Other Related Program Elements: 0604567N, 0604307N, 0204228N Line Item MDAP/MAIS Code: N/A C/S modernization upgrades the Aegis Weapon Systems (AWS). The upgrades enable the DDG-51 Class to conduct Ballistic Missile Defense simultaneously while conducting Air Defense within its assigned theatre. For DDG MOD 1.5, DMP2 and DDG MOD 2.0 ships, C/S modernization establishes the foundation for upgrading the DDG-51 Class from the SPY-1 radar array to the SPY-6(V)4 solid-state radar, enabling the DDG-51 Class to remain tactically competitive against emerging threats. DDG MOD installations traditionally utilize a Firm Fixed Price Contracting Strategy for both the East and West Coasts of the United States. Modernization costs require multiple years of funding per ship to support Ship Checks (S/C), Ship Installation Drawing (SID) development, Long Lead Time Material purchase, and physical installation. Installation costs are budgeted based on the ship's homeport man-day rates as promulgated by the Navy. [P40A / DM002 - LAND BASED ENGINEERING SITES]: Land Based Engineering Sites (DM002) upgrades shore facilities utilized for pre-installation testing and crew training of HM&E and Combat Systems alterations. [P40A / DM012 - CEC]: Procures Cooperative Engagement Capability (CEC) combat systems that includes equipment procurement, recurring engineering, equipment integration and Integrated Logistics Support (ILS) products for DDG 51 Class ships. Flight IIA DDGs have previously received CEC installation. [P40A / DM013 - CONJUNCTIVE ALTERATION DEFINITION AND INTEGRATION]: Provides Conjunctive Alteration Definition and Integration including equipment procurement, non-recurring and recurring engineering, equipment integration and Integrated Logistics Support (ILS) products for DDG 51 Class ships. [P40A / DMCA-15 ADVANCED DAMAGE CONTROL SYSTEM CONGRESSIONAL ADD]: Advanced Damage Control System (ADCS) is a system for digitally plotting and managing fires and other damagerelated casualties in compartments throughout a ship. ADCS has an intuitive interface and the adaptability of being hosted on a portable electronic tablet. Current damage control consists of manual plotting using grease pencils as well as use of non-portable Repair Station Consoles (RSCs), which feature the ability to control equipment and systems aboard the ship. [P40A / DMCA-16 SOLID STATE RADAR PROCUREMENT CONGRESSIONAL ADD]: Procures the SPY-6(V)4 solid-state radar system to enable continuity in manufacturing and production with the Original Equipment Manufacturers (OEMs). [P40A / DM6IN - INSTALLATION]: Provides for installation of Fleet Modernization Program alterations that are associated with DDG MOD. Alterations include Fuel Oil System Control upgrades, Lube Oil Purifier improvements, Digital Indicators modifications, Vertical Launch System (VLS) Magazine ventilation changes, Microwave Tubes (DM006) and Ballistic Missile Defense (BMD) Cards (DM008). Upgrades address obsolescence and reliability problems with existing systems, support SM-3 missile operations, enable BMD missions, and improve operational availability of the DDG 51 Class ships. [P40A / HELO HANGER DOOR (HHD)]: Provides HHD upgrades for DDG-51 FLTIIA ships (DDG 113 and follow) to resolve documented HHD reliability issues. [P40A / OFFICER OF THE DECK SCREEN (OOD)]: Replaces the Interior Communication/Standard Module alarm panels in the 3 OOD stations and Combat Systems Maintenance Center with Multi-Function Color Repeaters for standardization of components and commonality with DDG 105 and follow design. [P40A / AWS VIDEO DISTRIBUTION SYSTEM & CIRCUIT 3 TV]: Replaces obsolete and unsupported legacy topside surveillance camera CKT-3TV Systems on HM&E MOD Avails (including sensors, pan/tilt, unit, controllers and other HW) with shock and environmentally qualified Commerical Off the Shelf (COTS) Camera System. [P40A / DIGITAL VOLTAGE REGULATOR (DVR)]: Replaces the obsolete legacy Excitation Control Panel (EXCOP) for three onboard generators and achieves commonality with DDG 113 and follow design. [P40A / COMBAT SYSTEM SHIP QUALIFICATION TRIALS (CSSQT)]: Provides for test planning and execution of live-fire testing enabling validation of the newly installed C/S equipment. CSSQT is required by Navy policy when major modifications are made to the C/S to ensure the kill chain functions properly and can support national tasking. It additionally provides real world training for the ship's crew and combat watch standers. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 2 of 72 P-1 Line #5 Volume 1 - 130 === page 209 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0900 / DDG Mod Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: 0204228N Other Related Program Elements: 0604567N, 0604307N, 0204228N Line Item MDAP/MAIS Code: N/A [P40A / AEGIS MODERNIZATION TESTING (AMT)]: Provides on-site engineering and technical support for AEGIS and C/S Modernization. AMT teams support AEGIS-system Light Off (ALO), C/S verification and alignment, and crew training for operations and maintenance of new AEGIS Combat Systems. AMT efforts support availability and installation planning efforts, engineering design products for upgrades, shipboard installation, and system testing. [P40A / DMCA5-BROMINE-FREE WATER PURIFICATION SYSTEM CONGRESSIONAL ADD]: Provides for design engineering and installation planning for installation of bromine-free water purification systems on DDG 51 class ships. Ship water purification systems historically used bromine as an antimicrobial. The bromine is introduced via scrubber cartridges, and these cartridges have supply chain risks and come with special hazardous material handling requirements. [P40A / DMCA8 - ARTIFICIAL INTELLIGENCE - CONGRESSIONAL ADD]: Congressional add for artificial intelligence for ready relevant learning. This initiative will enhance the Virtual-Total Ship Training Capability (V-TSTC), a virtual performance support training tool aimed at increasing individual Combat Systems Operational Sequencing System (CSOSS) familiarity and Advanced Training Domain (ATD) system readiness. [P40A / DM017 - SABT PROCUREMENT]: Static Automatic Bus Transfer (SABT) switches automatically transfer power to critical loads from a normal power source to an alternate power source in the event of interruption or abnormal conditions. SABT switches are required for various Ship Alterations being accomplished under the DDG MOD 2.0 Program. FY27 enables a bulk procurement to mitigate extended production lead times and support required material delivery dates for upcoming modernization availabilities. [P3A / DM001 - DDG MODERNIZATION HME (GEDMS)]: Gigabit Ethernet Data Multiplexing System (GEDMS) replaces the obsolete copper machinery control Local Area Network (LAN) infrastructure with a new system based on the widely used Ethernet industry standard. [P3A - 2 / DM001 - DDG MODERNIZATION HME (MCS/DCS)]: Machinery Control System (MCS) replaces the obsolete control consoles while also delivering enhanced capability to the Fleet through improved situational awareness and reconfigurable user stations. The new consoles use Commercial Off the Shelf (COTS)-based computers and software to replace the now obsolete Versa Modular Eurocard (VME)chassis technology. The architecture is anticipated to be supportable for the remaining service life of the ship and will enable computer upgrades within the chassis thereby mitigating future obsolescence concerns. [P3A - 3 / DM001 - DDG MODERNIZATION HME (DVSS)]: Digital Video Surveillance System (DVSS) is a network of video cameras integrated into the Machinery Control System. This system provides watchstander situational awareness which supplements the workload reduction benefits of the new MCS. [P3A - 4 / DM001 - DDG MODERNIZATION HME (WIRELESS COMMUNICATIONS)]: Shipwide Interior Wireless Communication System (SIWCS) provides point-to-point coverage throughout the internal spaces of the ship as well as topside, topside-to-interior, line of sight ship-to-ship & line of sight ship-to-shore communications capabilities. [P3A - 5 / DM001 - DDG MODERNIZATION HME (IBNS)]: The Integrated Bridge & Navigation System (IBNS) replaces obsolete bridge consoles and introduces flexibility with how the pilot house is managed during navigation. The key benefit is the ability to operate with fewer watch-standers, reduced watch-stander workloads, and improved safety of navigation. Navigation system upgrades transitions from IBNS to the Ship Control System (SCS) and DDG Electronic Charting Display Information System (ECDIS) Navigation hardware beginning with installation in FY2029. [P3A - 6 / DM001 - HES-C]: High Efficiency Super Capacity (HES-C) Chillers modernize the 50-year-old design Air Conditioning and Refrigeration (AC&R) systems installed on the DDG-51 Class. This upgrade replaces five AC&R systems on each ship receiving the SPY-6(V)4 Air and Missile Defense Radar (AMDR), to be installed conjunctively. [P3A - 7 / DM003 - MK 160 MOD 15 GWS]: Provides MK 160 Mod 15 Gun Weapon System (GWS) upgrades including equipment procurement, recurring engineering, equipment integration, installation, and Integrated Logistics Support (ILS) products for DDG 51 Class ships. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 3 of 72 P-1 Line #5 Volume 1 - 131 === page 210 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0900 / DDG Mod Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: 0204228N Other Related Program Elements: 0604567N, 0604307N, 0204228N Line Item MDAP/MAIS Code: N/A [P3A - 8 / DM004 - AWS UPGRADE]: Provides Aegis Weapon System (AWS) Upgrades including equipment procurement, recurring engineering, equipment integration, installation and Integrated Logistics Support (ILS) products for DDG 51 Class ships. [P3A - 9 / DM005 - MULTI-MISSION SIGPRO]: Provides the Multi-Mission Signal Processor (MMSP) to enable Ballistic Missile Defense capabilities for ships receiving C/S modernization upgrades and retaining the SPY-1(D) radar. Includes equipment procurement, recurring engineering, equipment integration, installation, and Integrated Logistics Support (ILS) products for DDG 51 Class ships. MMSP is not required for DDG MOD 2.0 ships receiving the SPY-6(V)4 radar upgrade. [P3A - 10 / DM006 - MULTI-MISSION SSA/CWI MICROWAVE TUBES]: Provides the Multi-Mission Solid State Amplifiers (SSAs) and Continuous Wave Illuminator (CWI) Microwave Tubes that enable Ballistic Missile Defense capabilities for ships receiving C/S modernization upgrades and retaining the SPY-1(D) radar. Includes equipment procurement, recurring engineering, equipment integration, installation, and Integrated Logistics Support (ILS) products for DDG 51 Class ships. Multi-Mission SSAs and Microwave Tubes are not required for DDG MOD 2.0 ships receiving the SPY-6(V)4 radar upgrade. [P3A - 11 / DM008 - MULTI-MISSION BMD CAPABILITY CARDS]: Provides Multi-Mission Ballistic Missile Defense (BMD) Capability cards including equipment procurement, recurring engineering, equipment integration, installation, and Integrated Logistics Support (ILS) products for DDG 51 Class ships. BMD cards are not required for DDG MOD 2.0 ships receiving the SPY-6(V)4 radar upgrade. [P3A - 12 / DM009 - VLS UPGRADES]: Provides Vertical Launch System (VLS) Modifications, Evolved Sea Sparrow Missile (ESSM) VLS Modifications, SM3 Operability Heating Ventilation Air Conditioning (HVAC) and VLS Modifications for SM3 Block 3 including equipment procurement, recurring engineering, equipment integration, installation and Integrated Logistics Support (ILS) products for DDG 51 Class ships. [P3A - 13 / DM011 - AN/SQQ-89 A(V15)]: Procures improved AN/SQQ-89(V)15 with Multi-Function Towed Array (MFTA) to replace the installed MIL-STD AN/SQQ-89(V) including equipment procurement, recurring engineering, equipment integration, installation and Integrated Logistics Support (ILS) products for DDG 51 Class ships. [P3A - 19 / DM014 SOLID STATE RADAR EQUIPMENT]: SPY-6(V)4 solid-state radar provides the latest capability to the DDG-51 Class for Air Defense and Ballistic Missile Defense. The SPY-6(V)4 upgrade replaces legacy SPY-1 radar arrays with SPY-6 arrays to deliver AEGIS Baseline 10M with Integrated Air and Missile Defense (IAMD) capability. SPY-6(V)4 upgrades are applicable to DDG 51 Flight IIA ships, DDG 91 through DDG 124 & DDG 127. SPY-6(V)4 fielding plans are integrated with SLQ32(V)7 (SEWIP BLK III) (BLI 2312) in order to rapidly deliver enhanced capability to the DDG-51 Class required to pace new threats by international competitors. SPY-6 Hardware also includes Installation and Checkout (INCO) kits that help with setting up and testing the system. The SPY6(v)4 system includes 24 Radar Modular Assemblies (RMAs) that deliver the radar's detection and tracking capabilities. This line also includes the necessary ancillary equipment such as Electronic Equipment Fluid Coolers (EEFC), specialized Fire Control System coolers (FCS), and the Radar Control Processer (RCP) which manages the SPY-6(V)4 radar's operations and integrates with the ship's combat system. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 4 of 72 P-1 Line #5 Volume 1 - 132 === page 211 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0900 / DDG Mod Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: 0204228N Other Related Program Elements: 0604567N, 0604307N, 0204228N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a DDG Mod / 1,145.327 - / 90.271 - / 335.638 - / 153.821 / - - / 153.821 P-3a 1 / DM001 - DDG MODERNIZATION HME (GEDMS) (SHIP ALT) - / 440.170 - / 29.800 - / 38.465 - / 19.277 - / 0.000 - / 19.277 P-3a 2 / DM001 - DDG MODERNIZATION HME (MCS/DCS) (SHIP ALT) - / 810.359 - / 56.525 - / 76.938 - / 47.590 - / 0.000 - / 47.590 P-3a 3 / DM001 - DDG MODERNIZATION HME (DVSS) (SHIP ALT) - / 69.632 - / 4.400 - / 5.806 - / 3.043 - / 0.000 - / 3.043 P-3a 4 / DM001 - DDG MODERNIZATION HME (WIRELESS COMMUNICATIONS) (SHIP ALT) - / 23.268 - / 1.066 - / 1.146 - / 0.000 - / 0.000 - / 0.000 P-3a 5 / DM001 - DDG MODERNIZATION HME (IBNS) (SHIP ALT) - / 340.465 - / 15.399 - / 25.430 - / 22.751 - / 0.000 - / 22.751 P-3a 6 / DM001 - HES-C (SHIP ALT) - / 47.397 - / 99.492 - / 62.300 - / 93.754 - / 0.000 - / 93.754 P-3a 7 / DM003 - MK 160 MOD 15 GWS (SHIP ALT) - / 161.297 - / 6.230 - / 7.720 - / 12.692 - / 0.000 - / 12.692 P-3a 8 / DM004 - AWS UPGRADE (SHIP ALT) / 1,239.557 - / 79.574 - / 96.914 - / 89.882 - / 0.000 - / 89.882 P-3a 9 / DM005 - MULTI-MISSION SIGPRO (SHIP ALT) - / 606.028 - / 30.141 - / 18.488 - / 5.848 - / 0.000 - / 5.848 P-3a 10 / DM006 - MULTI-MISSION SSA/CWI MICROWAVE TUBES (SHIP ALT) - / 30.919 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-3a 11 / DM008 - MULTI-MISSION BMD CAPABILITY CARDS (SHIP ALT) - / 51.989 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-3a 12 / DM009 - VLS UPGRADES (SHIP ALT) - / 280.999 - / 11.775 - / 14.089 - / 22.271 - / 0.000 - / 22.271 P-3a 13 / DM011 - AN/SQQ-89 A(V15) (SHIP ALT) - / 179.789 - / 4.234 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-3a 14 / DM013 - (1 MC/DIAS UPGRADE) (SHIP ALT) - / 81.329 - / 12.281 - / 16.346 - / 5.761 - / 0.000 - / 5.761 P-3a 15 / DM013 - (MORIAH WIND SYSTEM) (SHIP ALT) - / 34.281 - / 2.970 - / 2.070 - / 1.562 - / 0.000 - / 1.562 P-3a 16 / DM013 - (IVCS UPGRADE) (SHIP ALT) - / 151.506 - / 18.284 - / 23.411 - / 16.695 - / 0.000 - / 16.695 P-3a 17 / DM013 - Slewing Arm Davit (SLAD) (SHIP ALT) - / 16.399 - / 0.797 - / 0.986 - / 1.887 - / 0.000 - / 1.887 P-3a 18 / DM013 - AN/SPA-25 (SHIP ALT) - / 13.282 - / 1.203 - / 2.046 - / 0.670 - / 0.000 - P-3a 19 / DM014 SOLID STATE RADAR EQUIPMENT (SHIP ALT) - / 353.716 - / 357.623 - / 150.994 / 502.774 - / 0.000 P-40 Total Gross/Weapon System Cost / 6,077.709 - / 822.065 - / 878.787 - / 0.000 - - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code - - / 1,000.278 - / 502.774 / 1,000.278 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a DDG Mod P-3a 1 / DM001 - DDG MODERNIZATION HME (GEDMS) (SHIP ALT) - / 16.092 - / 31.645 - / 31.830 - / 30.978 - / 351.060 P-3a 2 / DM001 - DDG MODERNIZATION HME (MCS/DCS) (SHIP ALT) - / 40.980 - / 64.464 - / 57.755 - / 56.927 - / 708.372 P-3a 3 / DM001 - DDG MODERNIZATION HME (DVSS) (SHIP ALT) - / 2.133 - / 5.067 - / 5.110 - / 4.930 - / 50.827 P-3a 4 / DM001 - DDG MODERNIZATION HME (WIRELESS COMMUNICATIONS) (SHIP ALT) - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-3a 5 / DM001 - DDG MODERNIZATION HME (IBNS) (SHIP ALT) - / 15.996 - / 22.622 - / 18.121 - / 20.297 LI 0900 - DDG Mod Navy / 0.670 - - / - - / - UNCLASSIFIED Page 5 of 72 - / - P-1 Line #5 - / - - - / - - / / 989.317 / 1,919.910 - / 150.948 / 0.000 - / 25.480 / 233.059 - / 714.140 Volume 1 - 133 === page 212 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0900 / DDG Mod Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: 0204228N Other Related Program Elements: 0604567N, 0604307N, 0204228N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a 6 / DM001 - HES-C (SHIP ALT) - / 149.615 - / 203.363 - / 164.762 - / 167.573 P-3a 7 / DM003 - MK 160 MOD 15 GWS (SHIP ALT) - / 12.104 - / 15.560 - / 11.463 - / 15.270 P-3a 8 / DM004 - AWS UPGRADE (SHIP ALT) - / 72.695 - / 114.907 - / 106.554 - / 68.144 P-3a 9 / DM005 - MULTI-MISSION SIGPRO (SHIP ALT) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 660.505 P-3a 10 / DM006 - MULTI-MISSION SSA/CWI MICROWAVE TUBES (SHIP ALT) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 30.919 P-3a 11 / DM008 - MULTI-MISSION BMD CAPABILITY CARDS (SHIP ALT) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 51.989 P-3a 12 / DM009 - VLS UPGRADES (SHIP ALT) - / 21.195 - / 26.721 - / 20.333 - / 19.504 / 305.740 - / 722.627 P-3a 13 / DM011 - AN/SQQ-89 A(V15) (SHIP ALT) - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-3a 14 / DM013 - (1 MC/DIAS UPGRADE) (SHIP ALT) - / 3.738 - / 11.749 - / 11.785 - / 11.203 P-3a 15 / DM013 - (MORIAH WIND SYSTEM) (SHIP ALT) - / 1.058 - / 1.617 - / 0.935 - / 1.006 P-3a 16 / DM013 - (IVCS UPGRADE) (SHIP ALT) - / 11.868 - / 28.665 - / 28.878 - / 27.787 P-3a 17 / DM013 - Slewing Arm Davit (SLAD) (SHIP ALT) - / 1.643 - / 2.401 - / 2.437 - P-3a 18 / DM013 - AN/SPA-25 (SHIP ALT) - / 1.966 - / 2.259 - / 2.178 - P-3a 19 / DM014 SOLID STATE RADAR EQUIPMENT (SHIP ALT) P-40 Total Gross/Weapon System Cost - / 600.626 / 1,126.709 - / 478.197 / 1,157.505 - / 680.426 / 1,255.310 - - / 2,104.490 - - / 159.618 - / 1,553.557 - / 3,092.746 - - / 401.954 / 3,421.784 / 0.000 - / 184.023 / 119.973 - / 274.165 / 0.000 - / 45.499 - / 288.096 - / 595.190 / 2.418 - / 23.049 - / 52.017 / 2.177 - / 20.630 - - / 46.411 / 694.144 - / 5,918.325 - / 9,736.825 / 1,284.326 - / 13,883.071 - / 27,485.760 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY2027 request for BLI 0900 DDG MOD includes adjustments in alignment with the program fielding profile and cancellation of 2 DDG MOD DMP2s. FY2027 includes increases for the following: 1) installation costs aligned with updated port rates (all P3a related cost codes and DM6IN); 2) Land Based Test Site system validation and verification efforts supporting the SPY-6(V)4 shipboard power train, AEGIS Hardware, and AEGIS Combat Systems Baselines; 3) Awarded contract values for the High Efficiency Super Capacity (HES-C) Air Conditioning Units; 4) Pricing for follow on SPY-6(V)4 procurements; 5) Increased non-recurring engineering efforts for the transition of the Navigation System from the Integrated Bridge Navigation System to the Ship Controls Systems and AN/SYN-1(V)1 navigation system beginning with FY27 procurements; 6) Increased non-recurring engineering effort for the land based testing and validation of the Machinery Control System hardware and software prior to shipboard installation; and FY2027 CSSQT increases are aligned with the program fielding profile for planning and execution. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 6 of 72 P-1 Line #5 Volume 1 - 134 === page 213 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: DDG Mod FY 2026 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) 1) DM002 - LAND BASED ENGINEERING SITES 1.1) DM002 - Land Based Engineering Sites A (1) Subtotal: 1) DM002 - LAND BASED ENGINEERING SITES - - 263.381 - - 9.455 - - 13.008 - - 15.280 - - - - - 15.280 - - 263.381 - - 9.455 - - 13.008 - - 15.280 - - - - - 15.280 - - 95.009 - - - - - - - - - - - - - - - - - 95.009 - - - - - - - - - - - - - - - 14.843 - - - - - - - - - - - - - - - 2) DM007 - SPY-1D TRANSMITTER UPGRADES 2.1) DM007 - SPY-1D TRANSMITTER UPGRADES A Subtotal: 2) DM007 - SPY-1D TRANSMITTER UPGRADES 3) DM010 - FCS STAMO 3.1) DM010 - FCS STAMO EQUIPMENT A Subtotal: 3) DM010 - FCS STAMO 4) DM012 - CEC 14.843 1 - - 14.843 - - - - - - - - - - - - - - - - - 42.143 - - - - - - - - - - - - - - - - - 42.143 - - - - - - - - - - - - - - - (2) 4.1) DM012 - CEC EQUIPMENT A Subtotal: 4) DM012 - CEC 5) DM013 - CONJUNCTIVE ALTERATION DEFINITION AND INTEGRATION 5.1) DM013 CONJUNCTIVE ALTERATION DEFINITION AND INTEGRATION A Subtotal: 5) DM013 - CONJUNCTIVE ALTERATION DEFINITION AND INTEGRATION - - 110.305 - - - - - - - - - - - - - - - - - 110.305 - - - - - - - - - - - - - - - 6) DMCA-15 - ADVANCED DAMAGE CONTROL SYSTEM CONGRESSIONAL ADD 6.1) DMCA-15 ADVANCED DAMAGE CONTROL SYSTEM CONGRESSIONAL ADD A Subtotal: 6) DMCA-15 - ADVANCED DAMAGE CONTROL SYSTEM CONGRESSIONAL ADD - - - - - - - - 10.000 - - - - - - - - - - - 0.000 - - - - - 10.000 - - - - - - - - - - - - - - 182.000 - - - - - - - - - 7) DMCA-16 SOLID STATE RADAR PROCUREMENT CONGRESSIONAL ADD 7.1) DMCA-16 SPY-6(V)4 RADAR PROCUREMENT AND ENGINEERING A LI 0900 - DDG Mod Navy - - - UNCLASSIFIED Page 7 of 72 P-1 Line #5 Volume 1 - 135 === page 214 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Subtotal: 7) DMCA-16 SOLID STATE RADAR PROCUREMENT CONGRESSIONAL ADD FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2026 Total Cost Qty (Each) Aggregated Items Title: DDG Mod Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) - - 0.000 - - - - - 182.000 - - - - - - - - - - - 165.989 - - 39.000 - - 63.580 - - 42.918 - - - - - 42.918 - - 165.989 - - 39.000 - - 63.580 - - 42.918 - - - - - 42.918 1.935 15 29.028 - - - - - - 2.139 4.278 - - - 2.139 - - 29.028 - - - - - - - 4.278 - - - - 0.152 15 2.279 0.156 0.156 - - - 0.168 0.336 - - - 0.168 - - 2.279 - - 0.156 - - - - - 0.336 - - - - - 0.336 2.115 - - - - - - - - - - - - - - - - - - - - - - - 3.192 - - - 1.596 8) DM6IN - INSTALLATION 8.1) DM6IN INSTALLATIONS A Subtotal: 8) DM6IN - INSTALLATION 9) HELO HANGER DOOR (HHD) 9.1) HELO HANGER DOOR (HHD) EQUIPMENT A Subtotal: 9) HELO HANGER DOOR (HHD) 2 - 2 - 4.278 4.278 10) OFFICER OF THE DECK SCREEN (OOD) 10.1) OFFICER OF THE DECK SCREEN (OOD) EQUIPMENT A Subtotal: 10) OFFICER OF THE DECK SCREEN (OOD) 1 2 2 0.336 11) AWS VIDEO DISTRIBUTION SYSTEM & CIRCUIT 3 TV 11.1) AWS VDS & CK3TV EQUIPMENT A Subtotal: 11) AWS VIDEO DISTRIBUTION SYSTEM & CIRCUIT 3 TV 0.705 3 - - 2.115 - - - - - - - 1.438 18 25.878 - - - - - - 1.596 - - 3.496 - - 0.597 - - 0.631 - - 0.643 - - - - - 0.643 - - 29.374 - - 0.597 - - 0.631 - - 3.835 - - - - - 3.835 12) DIGITAL VOLTAGE REGULATOR (DVR) 12.1) DIGITAL VOLTAGE REGULATOR EQUIPMENT A 12.2) CONJUNCTIVE ALTERATION ENGINEERING A Subtotal: 12) DIGITAL VOLTAGE REGULATOR (DVR) 2 2 3.192 13) COMBAT SYSTEM SHIP QUALIFICATION TRIALS (CSSQT) 13.1) COMBAT SYSTEM SHIP QUALIFICATION TRIALS (CSSQT) A - - 115.389 - - 20.205 - - 30.462 - - 46.684 - - - - - 46.684 - - 115.389 - - 20.205 - - 30.462 - - 46.684 - - - - - 46.684 (3) Subtotal: 13) COMBAT SYSTEM SHIP QUALIFICATION TRIALS (CSSQT) 14) AEGIS MODERNIZATION TESTING (AMT) LI 0900 - DDG Mod Navy UNCLASSIFIED Page 8 of 72 P-1 Line #5 Volume 1 - 136 === page 215 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 14.1) AEGIS MODERNIZATION A TESTING (AMT) MAIS Code (4) Subtotal: 14) AEGIS MODERNIZATION TESTING (AMT) Unit Cost ($ M) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ M) Qty (Each) Aggregated Items Title: DDG Mod FY 2026 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) - - 154.805 - - 20.858 - - 35.957 - - 26.990 - - - - - 26.990 - - 154.805 - - 20.858 - - 35.957 - - 26.990 - - - - - 26.990 - - 39.067 - - - - - - - - - - - - - - - - - 39.067 - - - - - - - - - - - - - - - 15.000 - - - - - - - - - - - - - - - 15.000 - - - - - - - - - - - - - - - 15) DSA FOR FY14 AVAILABILITY 15.1) DSA FOR FY14 AVAILABILITY A Subtotal: 15) DSA FOR FY14 AVAILABILITY 16) MRG Procurement 16.1) MRG Equipment A Subtotal: 16) MRG Procurement 15.000 - 1 - 17) DMCA1 - DDG-51 MODERNIZATION PROGRAM CONGRESSIONAL ADD 17.1) DMCA1 - DDG-51 MODERNIZATION A 17.2) DMCA1 SQQ-89A (V) W/ MFTA A Subtotal: 17) DMCA1 - DDG-51 MODERNIZATION PROGRAM CONGRESSIONAL ADD - - 5.000 - - - - - - - - - - - - - - - - - 25.000 - - - - - - - - - - - - - - - - - 30.000 - - - - - - - - - - - - - - - 18) DMCA2 - TRAINING AND MAINTENANCE SUPPORT SYSTEM CONGRESSIONAL ADD 18.1) DMCA2 TRAINING AND MAINTENANCE SUPPORT SYSTEM A Subtotal: 18) DMCA2 - TRAINING AND MAINTENANCE SUPPORT SYSTEM CONGRESSIONAL ADD - - 9.000 - - - - - - - - - - - - - - - - - 9.000 - - - - - - - - - - - - - - - 19) DMCA3 - COMMUNICATIONS UPGRADE FOR DDG MOD CONGRESSIONAL ADD 19.1) DMCA3 COMMUNICATIONS UPGRADE A Subtotal: 19) DMCA3 COMMUNICATIONS UPGRADE FOR DDG MOD CONGRESSIONAL ADD - - 3.120 - - - - - - - - - - - - - - - - - 3.120 - - - - - - - - - - - - - - - 20) DMCA4 - SMART VALVE AUTOMATIC FIRE SUPPRESSION SYSTEM CONGRESSIONAL ADD 20.1) DMCA4 SMART VALVE EQUIPMENT A Subtotal: 20) DMCA4 - SMART VALVE AUTOMATIC FIRE LI 0900 - DDG Mod Navy - - 2.480 - - - - - - - - - - - - - - - - - 2.480 - - - - - - - - - - - - - - - UNCLASSIFIED Page 9 of 72 P-1 Line #5 Volume 1 - 137 === page 216 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years FY 2025 MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Total Cost Qty (Each) Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: DDG Mod FY 2026 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) SUPPRESSION SYSTEM CONGRESSIONAL ADD 21) DMCA5-BROMINE-FREE WATER PURIFICATION SYSTEM CONGRESSIONAL ADD 21.1) DMCA5BROMINEFREE WATER PURIFICATION SYSTEM A Subtotal: 21) DMCA5-BROMINEFREE WATER PURIFICATION SYSTEM CONGRESSIONAL ADD - - 12.000 - - - - - - - - - - - - - - - - - 12.000 - - - - - - - - - - - - - - - 22) DMCA6 - WATER PURIFICATION SYSTEMS CONGRESSIONAL ADD 22.1) DMCA6 - WATER PURIFICATION SYSTEMS A Subtotal: 22) DMCA6 - WATER PURIFICATION SYSTEMS CONGRESSIONAL ADD - - 5.000 - - - - - - - - - - - - - - - - - 5.000 - - - - - - - - - - - - - - - 23) DMCA7 - MOBILE SEAMANSHIP AND NAVIGATION TRAINER CONGRESSIONAL ADD 23.1) DMCA7 - MOBILE SEAMANSHIP AND NAVIGATION TRAINER A Subtotal: 23) DMCA7 - MOBILE SEAMANSHIP AND NAVIGATION TRAINER CONGRESSIONAL ADD - - 2.500 - - - - - - - - - - - - - - - - - 2.500 - - - - - - - - - - - - - - - 24) DMCA8 - ARTIFICIAL INTELLIGENCE - CONGRESSIONAL ADD 24.1) DMCA8 Artificial Intel for Ready Relevant Learning A Subtotal: 24) DMCA8 - ARTIFICIAL INTELLIGENCE - CONGRESSIONAL ADD - - 2.500 - - - - - - - - - - - - - - - - - 2.500 - - - - - - - - - - - - - - - 25) DM017 - SABT PROCUREMENT 25.1) DM017 - SABT PROCUREMENT A - - - - - - - - - - - 13.500 - - - - - 13.500 Subtotal: 25) DM017 - SABT PROCUREMENT - - 0.000 - - - - - - - - 13.500 - - - - - 13.500 Total - - 1,145.327 - - 90.271 - - - - 153.821 - - - - - 153.821 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. 335.638 Footnotes: LI 0900 - DDG Mod Navy UNCLASSIFIED Page 10 of 72 P-1 Line #5 Volume 1 - 138 === page 217 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 (1) (2) (3) P-1 Line Item Number / Title: 0900 / DDG Mod Aggregated Items Title: DDG Mod Land Based Engineering Sites (DM002) upgrades shore facilities utilized for pre-installation testing and crew training of HM&E and Combat Systems alterations. Installation efforts are accomplished via the Alteration Installation Teams (AITs) and the AEGIS Modernization Testing Team resourced in DM6IN. Combat System Ship Qualification Trials (CSSQT) provides event planning and execution for validation of newly modernized and installed systems prior to a ship's return to Fleet operations. This effort spans multiple years and the CSSQT is conducted at the end of a ship's modernization availability. (4) AEGIS Modernization Testing (AMT) provides support from design engineering and space arrangement prior to an availability through equipment installation, validation, and checkout for comprehensive combat system testing during a ship's availability. This effort spans all years of planning and execution for planned modernizations. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 11 of 72 P-1 Line #5 Volume 1 - 139 === page 218 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0900 / DDG Mod ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / DM001 - DDG MODERNIZATION HME (GEDMS) MDAP/MAIS Code: Prior Years 440.170 440.170 440.170 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - 29.800 38.465 19.277 0.000 19.277 16.092 31.645 31.830 30.978 - - - - - - - - - 29.800 38.465 19.277 0.000 19.277 16.092 31.645 31.830 30.978 - - - - - - - - - 29.800 38.465 19.277 0.000 19.277 16.092 31.645 31.830 30.978 Total 351.060 989.317 351.060 989.317 351.060 989.317 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Gigabit Ethernet Data Multiplexing System (GEDMS) replaces the obsolete copper machinery control Local Area Network (LAN) infrastructure with a new system based on the widely used Ethernet industry standard. Engineering Services: Production Support Services are phased over a three (3) year span starting two (2) years prior to installation on a per hull basis. It includes five (5) elements that are related to the production and delivery of a usable end-item: Production Engineering, Quality Assurance, Product Improvement, Acceptance Test and Evaluation, and Contractor Engineering and Technical Services (CETS). Due to the phasing of the requirement over a three year period, engineering services will fluctuate depending on the number of ships in each year. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 12 of 72 P-1 Line #5 Volume 1 - 140 === page 219 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / DM001 - DDG MODERNIZATION HME (GEDMS) MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Related RDT&E PEs: 0604567N Modification Type: SHIP ALT FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: DM001 - DDG MODERNIZATION HME (GEDMS) B Kits Recurring 1.1.1) GEDMS Equipment - NonOrganic (5) 1.1.2) GEDMS EQUIPMENT FLIGHT IIA - NonOrganic (6) Subtotal: Recurring 27 / 97.719 - / - - / - - / - - / - - 23 / 32.997 - / - - / - 2 / 3.316 - / - 2 / 3.316 / 130.716 - / - - / - 50 / 130.716 - / - - / - / 130.716 - / - - / - - Subtotal: DM001 - DDG MODERNIZATION HME (GEDMS) Subtotal: Procurement, All Modification Items - / - / - - 2 / 3.382 / - - 2 / 3.450 - 2 / 3.520 - 2 / 3.590 27 / 97.719 14 / 31.424 / / - - / 3.316 - / - - / 3.316 - / 3.382 - / 3.450 - / 3.520 - / 3.590 - / 31.424 - / 179.398 - 2 / 3.382 - 2 / 3.450 - 2 / 3.520 / 3.590 - 2 / 3.590 / 31.424 47 / 81.679 - - / 3.520 / - - 2 / 3.316 / 3.450 / - / 3.316 - / 3.382 / - 2 / 3.316 - / 3.316 - 14 / 31.424 - / 179.398 74 / 179.398 Support (All Modification Items) 2.1) GEDMS ENGINEERING SERVICES (7) Subtotal: Support - / 64.635 - / 5.048 - / 5.838 - / 6.331 - / - - / 6.331 - / 6.585 - / 6.706 - / 6.829 - / 6.966 - / 99.799 - / 208.737 - / 64.635 - / 5.048 - / 5.838 - / 6.331 - / - - / 6.331 - / 6.585 - / 6.706 - / 6.829 - / 6.966 - / 99.799 - / 208.737 / 0.000 - / 9.630 - / 6.125 - / 21.489 - / 21.481 - / 20.422 - / 219.837 - / 601.182 / - - / 9.630 - / 6.125 - / 21.489 - / 21.481 - / 20.422 - / 219.837 - / 601.182 Installation Modification Item 1 of 1: DM001 - DDG MODERNIZATION HME (GEDMS) - / 244.819 - / 24.752 - / 32.627 - / 9.630 Subtotal: Installation - / 244.819 - / 24.752 - / 32.627 - / 9.630 - Total Total Cost (Procurement + Support + Installation) LI 0900 - DDG Mod Navy 440.170 29.800 38.465 19.277 0.000 UNCLASSIFIED Page 13 of 72 19.277 16.092 31.645 P-1 Line #5 31.830 30.978 351.060 989.317 Volume 1 - 141 === page 220 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / DM001 - DDG MODERNIZATION HME (GEDMS) MDAP/MAIS Code: Modification Item 1 of 1: DM001 - DDG MODERNIZATION HME (GEDMS) Manufacturer Information Manufacturer Name: BOEING Manufacturer Location: ANAHEIM, CA Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 16 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2027 Mar 2028 Mar 2029 Jul 2030 Jul 2031 Delivery Dates Jul 2028 Jun 2029 Jun 2030 Nov 2031 Nov 2032 Installation Information Method of Implementation: SHIPYARD:: Installation Name: GEDMS Equipment Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 25 / 128.335 27 / 142.111 Prior Years 1 / 7.100 1 / 6.676 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 6.676 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 25 / 128.335 1 / 7.100 27 / 142.111 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 25 - - 1 - - - - 1 - - - - - - - - - - - - - - - - - - - - - 27 Out 25 - - - - - - - - - - - - - - - - - - - - - - - - - 27 LI 0900 - DDG Mod Navy - - 1 1 UNCLASSIFIED Page 14 of 72 P-1 Line #5 Volume 1 - 142 === page 221 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / DM001 - DDG MODERNIZATION HME (GEDMS) MDAP/MAIS Code: Modification Item 1 of 1: DM001 - DDG MODERNIZATION HME (GEDMS) Installation Information Method of Implementation: [none specified]:: Installation Name: GEDMS EQUIPMENT FLIGHT IIA Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 17 / 116.484 2 / 17.652 3 / 25.951 23 / 168.798 Prior Years 1 / 8.711 0 / 0.000 1 / 8.711 - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - 0 / 0.919 0 / 0.000 0 / 0.919 0 / 5.180 2 / 15.275 - / - - / - 0 / 0.000 2 / 21.374 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 0.945 0 / 5.331 2 / 15.612 - / - 0 / 0.000 2 / 21.888 FY 2029 - / - - / - - / - - / - - / - - / - - / - 0 / 0.883 0 / 4.981 2 / 14.504 0 / 0.000 2 / 20.368 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.888 0 / 5.005 2 / 16.257 2 / 22.150 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.913 2 / 21.310 2 / 22.223 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 14 / 182.270 14 / 182.270 2 / 20.422 18 / 219.837 47 / 459.071 Total 17 / 116.484 2 / 17.652 3 / 25.951 1 / 9.630 0 / 0.000 1 / 9.630 0 / 6.125 2 / 21.489 2 / 21.481 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 17 1 1 - - - 1 1 1 - 1 - - - - - - - 1 - 1 - 1 1 - - - 1 1 18 47 Out 11 - - - - - - 1 23 47 - 1 1 1 - - 3 - 1 - 1 - 1 2 - 1 - - - - - Footnotes: (5) Flight II prior year procurements are for DDG 78 installation in FY25 and DDG 75 installation in FY26. FY26 Installation is for DDG 75 which requires Lead Maintenance Activity Contract award in Q4 2026 prior to FY27 Availability start. (6) Flight IIA prior year (FY23) procurement deferred from DDG 106 is planned for installation on DDG 102 in FY26. Flight IIA prior year (FY22) procurement deferred from DDG 99 is planned for installation on DDG 101 in FY27. All budget requests have been adjusted to account for equipment utilization on DDG 102 and DDG 101. (7) FY2027 Engineering Services increase for non-recurring effort to transition from Second Generation to Third Generation GEDMS due to obsolescence. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 15 of 72 P-1 Line #5 Volume 1 - 143 === page 222 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0900 / DDG Mod ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 2 / DM001 - DDG MODERNIZATION HME (MCS/DCS) MDAP/MAIS Code: Prior Years 810.359 810.359 810.359 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - 56.525 76.938 47.590 0.000 47.590 40.980 64.464 57.755 56.927 - - - - - - - - - 56.525 76.938 47.590 0.000 47.590 40.980 64.464 57.755 56.927 - - - - - - - - - 56.525 76.938 47.590 0.000 47.590 40.980 64.464 57.755 56.927 Total 708.372 1,919.910 708.372 1,919.910 708.372 1,919.910 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Machinery Control System (MCS) replaces the obsolete control consoles while also delivering enhanced capability to the Fleet through improved situational awareness and reconfigurable user stations. The new consoles integrate Commercial Off the Shelf (COTS)-based and software to replace the now obsolete Versa Modular Eurocard (VME)-chassis technology found in prior variants. The new architecture is anticipated to support the remaining service life of the ship and will enable computer upgrades within the chassis thereby mitigating future obsolescence concerns. Engineering Services: Production Support Services are phased over a three (3) year span starting two (2) years prior to installation on a per hull basis. It includes five (5) elements that are related to the production and delivery of a usable end-item: Production Engineering, Quality Assurance, Product Improvement, Acceptance Test and Evaluation, and Contractor Engineering and Technical Services (CETS). Due to the phasing of the requirement over a three-year period, engineering services will fluctuate depending on the number of ships in each year. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 16 of 72 P-1 Line #5 Volume 1 - 144 === page 223 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / DM001 - DDG MODERNIZATION HME (MCS/DCS) MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Related RDT&E PEs: 0604567N Modification Type: SHIP ALT FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: DM001 - DDG MODERNIZATION HME (MCS/DCS) B Kits Recurring 50 / 212.895 - / - - / - / 212.895 - / - - / - - / 8.643 - / - - / - - / 8.643 - / - - / - 50 / 221.538 - / - - / - - / 221.538 - / - - / - - / 151.485 - / 13.954 - / 19.233 - / 151.485 - / 13.954 - / 19.233 Modification Item 1 of 1: DM001 - DDG MODERNIZATION HME (MCS/DCS) - / 437.336 - / 42.571 - Subtotal: Installation - / 437.336 - / 42.571 - 1.1.1) MCS/DCS EQUIPMENT FL II/IIA - NonOrganic (8) Subtotal: Recurring - 2 / 9.762 - / - / 9.762 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 9.762 - / - 2 / 9.762 / 9.762 - / - - / 21.199 - / - - / 21.199 - / 21.199 - / - - / 21.199 / 57.705 - / 16.629 / 0.000 - / 57.705 - / 16.629 / - - - 2 / 9.762 2 / 9.958 / 9.762 - / 9.958 - 2 / 10.156 - 1 / 5.180 / 10.156 / 5.180 - 2 / 10.568 - 15 / 92.512 / 10.568 74 / 351.031 / 92.512 - - / 351.031 Non-Recurring 1.2.1) MCS/DCS 1ST ARTICLE & NRE - Organic Subtotal: Non-Recurring Subtotal: DM001 - DDG MODERNIZATION HME (MCS/ DCS) Subtotal: Procurement, All Modification Items - - 2 / 9.958 / 9.762 2 / 10.156 / 9.958 - / 10.156 - / 17.934 - / 15.188 - / 17.934 - / 15.188 / 16.629 - / 13.088 - / 16.629 - / 13.088 - - 1 / 5.180 2 / 10.568 / 5.180 - / 10.568 - / 14.447 - / 14.736 - / 14.447 - / 14.736 / 39.120 - / 38.128 - / 39.120 - / 38.128 - - - / - - / 8.643 / 0.000 - / 8.643 15 / 92.512 74 / 359.674 / 92.512 - / 359.674 - / 211.126 - / 479.302 - / 211.126 - / 479.302 / 31.623 - / 404.734 - / 1,080.934 / 31.623 - / 404.734 - / 1,080.934 - Support (All Modification Items) 2.1) MCS/DCS ENGINEERING SERVICES (9) Subtotal: Support Installation - Total Total Cost (Procurement + Support + Installation) LI 0900 - DDG Mod Navy 810.359 56.525 76.938 47.590 0.000 UNCLASSIFIED Page 17 of 72 47.590 40.980 64.464 P-1 Line #5 57.755 56.927 708.372 1,919.910 Volume 1 - 145 === page 224 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / DM001 - DDG MODERNIZATION HME (MCS/DCS) MDAP/MAIS Code: Modification Item 1 of 1: DM001 - DDG MODERNIZATION HME (MCS/DCS) Manufacturer Information Manufacturer Name: VARIOUS Manufacturer Location: VARIOUS Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 16 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2027 Mar 2028 Mar 2029 Jul 2030 Jul 2031 Delivery Dates Jul 2028 Jun 2029 Jun 2030 Nov 2031 Nov 2032 Installation Information Method of Implementation: [none specified]:: Installation Name: MCS/DCS EQUIPMENT FL II/IIA Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 42 / 437.336 3 / 42.571 4 / 57.705 1 / 14.863 0 / 0.000 1 / 14.863 50 / 552.475 Prior Years - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - 0 / 1.766 0 / 0.000 0 / 1.766 0 / 11.271 2 / 25.824 - / - - / - 0 / 0.000 2 / 38.861 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 1.817 0 / 11.598 2 / 26.437 - / - 0 / 0.000 2 / 39.852 FY 2029 - / - - / - - / - - / - - / - - / - - / - 0 / 1.698 0 / 10.838 2 / 24.423 0 / 0.000 2 / 36.959 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.853 0 / 5.445 1 / 11.141 1 / 17.439 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 1.755 2 / 38.638 2 / 40.393 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 15 / 354.955 15 / 354.955 2 / 31.623 18 / 404.734 74 / 1,080.934 Total 42 / 437.336 3 / 42.571 4 / 57.705 1 / 16.629 0 / 0.000 1 / 16.629 0 / 13.088 2 / 39.120 2 / 38.128 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 42 1 1 1 - - 1 1 2 - 1 - - - - - - - 1 - 1 - 1 1 - - - 1 1 18 74 Out 36 1 1 - - - 1 23 74 - 1 - - 3 - 2 - 1 - 1 - 1 - 2 - 1 - - - - - Footnotes: (8) FY26 Installation includes DDG 75 which requires Lead Maintenance Activity Contract award in Q4 2026 prior to FY2027 Availability start. Prior year procurements are for DDG 78 installation in FY25 and DDG 75 installation in FY26. Prior year (FY23) procurement deferred from DDG 106 is planned for installation on DDG 102 in FY26. Prior year (FY22) procurement deferred from DDG 99 is planned for installation on DDG 101 in FY27. All budget requests have been adjusted to account for equipment utilization on DDG 102 and DDG 101. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 18 of 72 P-1 Line #5 Volume 1 - 146 === page 225 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0900 / DDG Mod ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / DM001 - DDG MODERNIZATION HME (MCS/DCS) MDAP/MAIS Code: (9) MCS Engineering Services efforts increase in FY27 in support of hardware and software integration efforts required for installation of the latest MCS equipment. This effort enables land based testing and validation of the machinery control software prior to shipboard installation. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 19 of 72 P-1 Line #5 Volume 1 - 147 === page 226 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0900 / DDG Mod ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 3 / DM001 - DDG MODERNIZATION HME (DVSS) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 69.632 4.400 5.806 3.043 0.000 3.043 2.133 5.067 5.110 4.930 50.827 - - - - - - - - - - - 69.632 4.400 5.806 3.043 0.000 3.043 2.133 5.067 5.110 4.930 50.827 - - - - - - - - - - - 69.632 4.400 5.806 3.043 0.000 3.043 2.133 5.067 5.110 4.930 50.827 Total 150.948 150.948 150.948 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Digital Video Surveillance System (DVSS) is a network of video cameras which are integrated into the Machinery Control System (MCS). This system is primarily a watch-stander situational awareness tool which supplements the workload reduction benefits of the new MCS. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 20 of 72 P-1 Line #5 Volume 1 - 148 === page 227 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / DM001 - DDG MODERNIZATION HME (DVSS) MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Related RDT&E PEs: 0604567N Modification Type: SHIP ALT FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: DM001 - DDG MODERNIZATION HME (DVSS) B Kits Recurring 50 / 23.530 - / - - / - / 23.530 - / - - / - - / 0.477 - / - - / - - / 0.477 - / - - / - 50 / 24.007 - / - - / - - / 24.007 - / - - / - Modification Item 1 of 1: DM001 - DDG MODERNIZATION HME (DVSS) - / 45.625 - / 4.400 - Subtotal: Installation - / 45.625 - / 4.400 - 1.1.1) DVSS Equipment - NonOrganic (10) Subtotal: Recurring - 2 / 1.224 - / - / 1.224 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 1.224 - / - 2 / 1.224 - / 1.224 - / - - / 1.224 - / 1.248 - / 1.274 - / 1.298 - / 1.326 - / 11.600 / 5.806 - / 1.819 / 0.000 - / 1.819 - / 0.885 - / 3.793 - / 3.812 - / 3.604 - / 39.227 - / 108.971 / 5.806 - / 1.819 / - - / 1.819 - / 0.885 - / 3.793 - / 3.812 - / 3.604 - / 39.227 - / 108.971 - 2 / 1.224 / 1.224 - 2 / 1.248 / 1.248 - 2 / 1.274 / 1.274 - 2 / 1.298 / 1.298 - 2 / 1.326 / 1.326 - 14 / 11.600 74 / 41.500 / 11.600 - / 41.500 - Non-Recurring 1.2.1) DVSS 1st Article & NRE - Organic Subtotal: Non-Recurring Subtotal: DM001 - DDG MODERNIZATION HME (DVSS) Subtotal: Procurement, All Modification Items 2 / 1.248 2 / 1.274 2 / 1.298 2 / 1.326 - / - - / 0.477 / 0.000 - / 0.477 14 / 11.600 74 / 41.977 - / 41.977 Installation - Total Total Cost (Procurement + Support + Installation) LI 0900 - DDG Mod Navy 69.632 4.400 5.806 3.043 0.000 UNCLASSIFIED Page 21 of 72 3.043 2.133 5.067 P-1 Line #5 5.110 4.930 50.827 150.948 Volume 1 - 149 === page 228 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / DM001 - DDG MODERNIZATION HME (DVSS) MDAP/MAIS Code: Modification Item 1 of 1: DM001 - DDG MODERNIZATION HME (DVSS) Manufacturer Information Manufacturer Name: LEIDOS Manufacturer Location: STERLING, VA Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 16 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2027 Mar 2028 Mar 2029 Jul 2030 Jul 2031 Delivery Dates Jul 2028 Jun 2029 Jun 2030 Nov 2031 Nov 2032 Installation Information Method of Implementation: [none specified]:: Installation Name: DVSS Equipment Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 42 / 45.625 50 / 57.488 Prior Years 3 / 4.400 4 / 5.806 1 / 1.657 0 / 0.000 1 / 1.657 - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - 0 / 0.162 0 / 0.000 0 / 0.162 0 / 0.718 2 / 2.898 - / - - / - 0 / 0.000 2 / 3.778 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 0.167 0 / 0.739 2 / 2.964 - / - 0 / 0.000 2 / 3.870 FY 2029 - / - - / - - / - - / - - / - - / - - / - 0 / 0.156 0 / 0.691 2 / 2.749 0 / 0.000 2 / 3.596 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.157 0 / 0.694 2 / 3.088 2 / 3.939 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.161 2 / 3.784 2 / 3.945 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 14 / 32.355 14 / 32.355 2 / 3.604 18 / 39.227 74 / 108.971 Total 42 / 45.625 3 / 4.400 4 / 5.806 1 / 1.819 0 / 0.000 1 / 1.819 0 / 0.885 2 / 3.793 2 / 3.812 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 42 1 1 1 - - 1 1 2 - 1 - - - - - - - 1 - 1 - 1 1 - - - 1 1 18 74 Out 36 1 1 - 3 - - - 1 23 74 - 1 - - 2 - 1 - 1 - 1 - 2 - 1 - - - - - Footnotes: (10) FY26 Installation includes DDG 75 which requires Lead Maintenance Activity Contract award in Q4 2026 prior to FY27 Availability start. Prior year procurements are for DDG 78 installation in FY25 and DDG 75 installation in FY26. Prior year (FY23) procurement deferred from DDG 106 is planned for installation on DDG 102 in FY26. Prior year (FY22) procurement deferred from DDG 99 is planned for installation on DDG 101 in FY27. All budget requests have been adjusted to account for equipment utilization on DDG 102 and DDG 101. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 22 of 72 P-1 Line #5 Volume 1 - 150 === page 229 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0900 / DDG Mod ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 4 / DM001 - DDG MODERNIZATION HME (WIRELESS COMMUNICATIONS) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 23.268 1.066 1.146 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 25.480 Total - - - - - - - - - - - - 23.268 1.066 1.146 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 25.480 - - - - - - - - - - - - 23.268 1.066 1.146 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 25.480 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Ship wide Interior Wireless Communication System (SIWCS) provides point-to-point coverage throughout the internal spaces of the ship as well as topside, topside-to-interior, line of sight ship-to-ship & line of sight ship-to-shore communications capabilities. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 23 of 72 P-1 Line #5 Volume 1 - 151 === page 230 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Financial Plan Modification Number / Title: 4 / DM001 - DDG MODERNIZATION HME (WIRELESS COMMUNICATIONS) Related RDT&E PEs: 0604567N Modification Type: SHIP ALT FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: DM001 - DDG MODERNIZATION HME (WIRELESS COMMUNICATIONS) B Kits Recurring 1.1.1) Wireless Communications Equipment NonOrganic (11) Subtotal: Recurring 20 / 8.386 - / - - / - - / - - / - - / - - / - - / - - / - - / - Subtotal: Procurement, All Modification Items / - 20 / 8.386 / 8.386 - / - - / - - / - - / - - / - - / - - / - - / - - / - 20 / 8.386 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 8.386 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 / 0.000 - / 0.000 - / 17.094 / - - / 0.000 - / 17.094 - Subtotal: DM001 - DDG MODERNIZATION HME (WIRELESS COMMUNICATIONS) - - / 0.000 - - / - / 8.386 20 / 8.386 - / 8.386 Installation Modification Item 1 of 1: DM001 - DDG MODERNIZATION HME (WIRELESS COMMUNICATIONS) - / 14.882 - / 1.066 - / 1.146 Subtotal: Installation - / 14.882 - / 1.066 - / 1.146 - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - - Total Total Cost (Procurement + Support + Installation) LI 0900 - DDG Mod Navy 23.268 1.066 1.146 0.000 0.000 UNCLASSIFIED Page 24 of 72 0.000 0.000 0.000 P-1 Line #5 0.000 0.000 0.000 25.480 Volume 1 - 152 === page 231 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / DM001 - DDG MODERNIZATION HME (WIRELESS COMMUNICATIONS) MDAP/MAIS Code: Modification Item 1 of 1: DM001 - DDG MODERNIZATION HME (WIRELESS COMMUNICATIONS) Manufacturer Information Manufacturer Name: NAVAL INFORMATION WARFARE CENTER ATLANTIC Manufacturer Location: CHARLESTON, SC Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 16 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: [none specified]:: Installation Name: Wireless Communications Equipment Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 18 / 14.882 20 / 17.094 Prior Years 1 / 1.066 1 / 1.146 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 1.146 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 18 / 14.882 1 / 1.066 20 / 17.094 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 18 - - 1 - - - - 1 - - - - - - - - - - - - - - - - - - - - - 20 Out 18 - - - - - - - - - - - - - - - - - - - - - - - - - 20 - - 1 1 Footnotes: (11) FY26 Installation includes DDG 75 which requires Lead Maintenance Activity Contract award in Q4 2026 prior to FY27 Availability start. DDG 51 Flight II prior year procurements are for DDG 78 installation in FY25 and DDG 75 installation in FY26. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 25 of 72 P-1 Line #5 Volume 1 - 153 === page 232 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0900 / DDG Mod ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 5 / DM001 - DDG MODERNIZATION HME (IBNS) MDAP/MAIS Code: Prior Years 340.465 340.465 340.465 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - 15.399 25.430 22.751 0.000 22.751 15.996 22.622 18.121 20.297 - - - - - - - - - 15.399 25.430 22.751 0.000 22.751 15.996 22.622 18.121 20.297 - - - - - - - - - 15.399 25.430 22.751 0.000 22.751 15.996 22.622 18.121 20.297 Total 233.059 714.140 233.059 714.140 233.059 714.140 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The Integrated Bridge & Navigation System (IBNS) replaces obsolete bridge consoles and introduces flexibility with how the pilot house is managed during navigation. The key benefit is the ability to operate with fewer watch-standers, reduced watch-standing workloads, and improved safety of navigation. Navigation system upgrades transitions from IBNS to the Ship Control System (SCS) and DDG Electronic Charting Display Information System (ECDIS) Navigation hardware beginning with installation in FY29. Engineering Services: Production Support Services are phased over a three (3) year span starting two (2) years prior to installation on a per hull basis. It includes five (5) elements that are related to the production and delivery of a usable end-item: Production Engineering, Quality Assurance, Product Improvement, Acceptance Test and Evaluation, and Contractor Engineering and Technical Services (CETS). Due to the phasing of the requirement over a three-year period, engineering services will fluctuate depending on the number of ships in each year. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 26 of 72 P-1 Line #5 Volume 1 - 154 === page 233 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / DM001 - DDG MODERNIZATION HME (IBNS) MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Related RDT&E PEs: 0604567N Modification Type: SHIP ALT FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: DM001 - DDG MODERNIZATION HME (IBNS) B Kits Recurring 1.1.1) IBNS Equipment - NonOrganic (12) 50 / 167.981 1.1.2) IBNS 1st Article & NRE - Organic Subtotal: Recurring - Subtotal: Procurement, All Modification Items / - - / - / 4.186 - / - - / - / 172.167 - / - - / - 50 / 172.167 - / - - / - / 172.167 - / - - / - - Subtotal: DM001 - DDG MODERNIZATION HME (IBNS) - - 2 / 7.832 - / - - 2 / 7.832 / / - 2 / 7.832 - / - - / 7.832 - / - - / 7.832 - / 7.988 - / 8.148 - / 4.156 - / 8.478 - / 78.370 2 / 7.832 - / 7.988 - 2 / 7.988 / - - / 8.148 - 2 / 8.148 / - - 15 / 78.370 - - / - 2 / 8.478 - / 7.832 - 1 / 4.156 / - - / - 2 / 8.148 / 7.832 - - 2 / 7.988 / 4.156 - 1 / 4.156 / - - / 8.478 - 2 / 8.478 74 / 282.953 / - / 78.370 15 / 78.370 - / 4.186 / 287.139 - 74 / 287.139 / 287.139 - Support (All Modification Items) 2.1) ENGINEERING SERVICES (13) Subtotal: Support - / 18.302 - / 1.497 - / 5.524 - / 9.651 - / - - / 9.651 - / 3.579 - / 1.806 - / 1.637 - / 1.670 - / 23.923 - / 67.589 - / 18.302 - / 1.497 - / 5.524 - / 9.651 - / - - / 9.651 - / 3.579 - / 1.806 - / 1.637 - / 1.670 - / 23.923 - / 67.589 / 0.000 - / 5.268 - / 4.429 - / 12.668 - / 12.328 - / 10.149 - / 130.766 - / 359.412 / - - / 5.268 - / 4.429 - / 12.668 - / 12.328 - / 10.149 - / 130.766 - / 359.412 Installation Modification Item 1 of 1: DM001 - DDG MODERNIZATION HME (IBNS) - / 149.996 - / 13.902 - / 19.906 - / 5.268 Subtotal: Installation - / 149.996 - / 13.902 - / 19.906 - / 5.268 - Total Total Cost (Procurement + Support + Installation) LI 0900 - DDG Mod Navy 340.465 15.399 25.430 22.751 0.000 UNCLASSIFIED Page 27 of 72 22.751 15.996 22.622 P-1 Line #5 18.121 20.297 233.059 714.140 Volume 1 - 155 === page 234 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / DM001 - DDG MODERNIZATION HME (IBNS) MDAP/MAIS Code: Modification Item 1 of 1: DM001 - DDG MODERNIZATION HME (IBNS) Manufacturer Information Manufacturer Name: VARIOUS Manufacturer Location: VARIOUS Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 16 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2027 Mar 2028 Mar 2029 Jul 2030 Jul 2031 Delivery Dates Jul 2028 Jun 2029 Jun 2030 Nov 2031 Nov 2032 Installation Information Method of Implementation: [none specified]:: Installation Name: IBNS Equipment Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 42 / 149.996 3 / 13.902 4 / 19.906 50 / 188.500 Prior Years 1 / 4.696 0 / 0.000 1 / 4.696 - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - 0 / 0.572 0 / 0.000 0 / 0.572 0 / 3.841 2 / 8.166 - / - - / - 0 / 0.000 2 / 12.579 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 0.588 0 / 3.952 2 / 8.358 - / - 0 / 0.000 2 / 12.898 FY 2029 - / - - / - - / - - / - - / - - / - - / - 0 / 0.550 0 / 3.694 2 / 7.725 0 / 0.000 2 / 11.969 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.276 0 / 1.856 1 / 3.526 1 / 5.658 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.568 2 / 12.490 2 / 13.058 - / - - / - - / - - / - - / - - / - - / - - / - - / - / - 15 / 114.750 15 / 114.750 2 / 10.149 18 / 130.766 74 / 359.412 To Complete Total 42 / 149.996 3 / 13.902 4 / 19.906 1 / 5.268 0 / 0.000 1 / 5.268 0 / 4.429 2 / 12.668 - 2 / 12.328 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 42 1 1 1 - - 1 1 2 - 1 - - - - - - - 1 - 1 - 1 1 - - - 1 1 18 74 Out 36 1 1 - - - 1 23 74 - 1 - - 3 - 2 - 1 - 1 - 1 - 2 - 1 - - - - - Footnotes: (12) FY26 Installation includes DDG 75 which requires Lead Maintenance Activity Contract award in Q4 2026 prior to FY27 Availability start. Prior year procurements are for DDG 78 installation in FY25 and DDG 75 installation in FY26. Prior year (FY23) procurement deferred from DDG 106 is planned for installation on DDG 102 in FY26. Prior year (FY22) procurement deferred from DDG 99 is planned for installation on DDG 101 in FY27. All budget requests have been adjusted to account for equipment utilization on DDG 102 and DDG 101. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 28 of 72 P-1 Line #5 Volume 1 - 156 === page 235 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0900 / DDG Mod ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / DM001 - DDG MODERNIZATION HME (IBNS) MDAP/MAIS Code: (13) Navigation System Engineering Services increase in FY27 in support of the transition from the Integrated Bridge Navigation System (IBNS) to the Ship Control System (SCS) and AN/SYN-1(V)1 navigation system. Engineering efforts support first time production engineering, systems integration, and design updates necessary to certify functionality and system interoperability prior to shipboard installation. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 29 of 72 P-1 Line #5 Volume 1 - 157 === page 236 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0900 / DDG Mod ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 6 / DM001 - HES-C MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 47.397 99.492 62.300 93.754 0.000 93.754 - - - - - - 47.397 99.492 62.300 93.754 0.000 93.754 - - - - - - 47.397 99.492 62.300 93.754 0.000 93.754 149.615 149.615 149.615 203.363 203.363 203.363 164.762 164.762 164.762 To FY 2031 Complete 167.573 167.573 167.573 Total 2,104.490 3,092.746 2,104.490 3,092.746 2,104.490 3,092.746 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: High Efficiency Super Capacity (HES-C) Chillers modernize the 50-year-old design Air Conditioning and Refrigeration (AC&R) systems installed on the DDG-51 Class. HES-C provides increased cooling capacity while reducing mechanical complexity making it lighter, more efficient and improving operational availability. This upgrade replaces five AC&R systems on each ship receiving the SPY-6(V)4 Air and Missile Defense Radar (AMDR), to be installed conjunctively. FY25 procurements transition the HES-C system from a two-year production lead time to a three-year production lead time. Hardware procurement costs for FY27 and follow years align with awarded contract values. Engineering support services provide Production Engineering, Quality Assurance, Product Improvement, Acceptance Test and Evaluation, and Contractor Engineering and Technical Services (CETS). Includes development and delivery of logistics support products, technical manuals, and training support for the HES-C system. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 30 of 72 P-1 Line #5 Volume 1 - 158 === page 237 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / DM001 - HES-C MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Modification Type: SHIP ALT FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: DM001 - HES-C B Kits Recurring 1.1.1) DM001 - HES-C - NonOrganic 1 / 30.000 (14) Subtotal: Recurring Subtotal: DM001 - HES-C Subtotal: Procurement, All Modification Items / 30.000 - 3 / 91.350 - / - / 91.350 - / - 3 / 91.350 - / - / 91.350 - / - - 1 / 30.000 2 / 78.826 - / - / 78.826 - / - 2 / 78.826 - / - / 78.826 - / - - 2 / 78.826 / 78.826 - 2 / 80.404 2 / 78.826 2 / 80.404 1 / 41.825 / 82.012 - 2 / 82.012 1 / 41.825 - 1 / 42.662 14 / 731.496 26 / 1,178.575 / 1,178.575 - 26 / 1,178.575 / 17.233 - / 5.124 - / 9.053 - / 9.234 - / - - / 9.234 - / 9.419 - / 9.607 - / 9.799 - / 17.233 - / 5.124 - / 9.053 - / 9.234 - / - - / 9.234 - / 9.419 - / 9.607 - / 9.799 / 0.000 - / 5.694 - / 59.792 - / 111.744 - / 113.138 - / 114.916 - / 1,229.795 - / 1,691.508 / - - / 5.694 - / 59.792 - / 111.744 - / 113.138 - / 114.916 - / 1,229.795 - / 1,691.508 - - / 41.825 / 731.496 - - / 82.012 14 / 731.496 / 42.662 - / 30.000 - / 80.404 1 / 42.662 / 41.825 - - - / 78.826 2 / 82.012 / 80.404 - - / 42.662 - / 731.496 - / 9.995 - / 143.199 - / 222.663 - / 9.995 - / 143.199 - / 222.663 - / 1,178.575 - Support (All Modification Items) 2.1) ENGINEERING SERVICES Subtotal: Support Installation Modification Item 1 of 1: DM001 - HES-C - / 0.164 - / 3.018 - / 53.247 - / 5.694 Subtotal: Installation - / 0.164 - / 3.018 - / 53.247 - / 5.694 - Total Total Cost (Procurement + Support + Installation) LI 0900 - DDG Mod Navy 47.397 99.492 62.300 93.754 0.000 UNCLASSIFIED Page 31 of 72 93.754 149.615 203.363 P-1 Line #5 164.762 167.573 2,104.490 3,092.746 Volume 1 - 159 === page 238 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / DM001 - HES-C MDAP/MAIS Code: Modification Item 1 of 1: DM001 - HES-C Manufacturer Information Manufacturer Name: JOHNSON CONTROLS NAVY SYSTEMS Manufacturer Location: YORK, PA Administrative Leadtime (in Months): 0 Production Leadtime (in Months): 36 Dates FY 2025 Contract Dates Delivery Dates FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Apr 2025 Jan 2027 Apr 2028 Jun 2029 Jan 2030 Mar 2031 Apr 2027 Jan 2030 Apr 2031 Jun 2032 Jan 2033 Mar 2034 Installation Information Method of Implementation: [none specified]:: Installation Name: DM001 - HES-C Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 0 / 0.164 0 / 2.851 1 / 52.737 - - - / - - / - 0 / 0.000 1 / 55.752 FY 2025 - / - 0 / 0.167 0 / 0.510 0 / 5.694 0 / 0.000 0 / 5.694 - / - - / - 0 / 0.000 3 / 167.028 FY 2026 - / - - / - - / - - / - - / - - / - - - / - - / - - FY 2027 - / - - / - - / - - / - - / - - / - 0 / 0.559 0 / 9.798 2 / 103.456 - / - 0 / 0.000 2 / 113.813 FY 2028 - / - - / - - / - - / - - / - - / - - / - 0 / 0.522 0 / 9.157 2 / 105.445 0 / 0.000 2 / 115.124 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.525 0 / 9.201 2 / 107.640 2 / 117.366 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.270 1 / 59.547 1 / 59.817 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 61.058 1 / 61.058 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 14 / 1,001.550 14 / 1,001.550 Total 0 / 0.164 18 / 1,229.795 26 / 1,691.508 Installation Cost 0 / 3.018 1 / 53.247 / - - 0 / 5.694 / - - 0 / 0.000 / - - / - 1 / 59.233 0 / 5.694 / - 2 / 101.424 / - - 1 / 59.792 / - 2 / 111.744 2 / 113.138 2 / 114.916 / - - / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - 1 - - - - - - - 1 - 1 - 1 - 1 1 - - - 1 1 18 26 Out - - - - - - - - - - - - - - - - 1 - - - 1 23 26 - - - - - - 1 - Footnotes: (14) Hardware procurement costs for FY27 and following years align with awarded contract values. HES-C Production lead time increased from 2 to 3 years in FY25. Prior year (FY25) procurement deferred from DDG 93 is planned for installation on future year hull [DDG 104]. Prior year (FY25) procurement deferred from DDG 97 is planned for installation on future year hull [DDG 96]. All budget requests have been adjusted to account for equipment utilization on future year hulls. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 32 of 72 P-1 Line #5 Volume 1 - 160 === page 239 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0900 / DDG Mod ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 7 / DM003 - MK 160 MOD 15 GWS MDAP/MAIS Code: Prior Years 161.297 161.297 161.297 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - 6.230 7.720 12.692 0.000 12.692 12.104 15.560 11.463 15.270 - - - - - - - - - 6.230 7.720 12.692 0.000 12.692 12.104 15.560 11.463 15.270 - - - - - - - - - 6.230 7.720 12.692 0.000 12.692 12.104 15.560 11.463 15.270 Total 159.618 401.954 159.618 401.954 159.618 401.954 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Procures MK 160 Mod 15 Gun Weapon System (GWS) that includes equipment procurement, recurring engineering, equipment integration and Integrated Logistics Support (ILS) products for DDG 51 Class ships. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 33 of 72 P-1 Line #5 Volume 1 - 161 === page 240 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Financial Plan Modification Number / Title: 7 / DM003 - MK 160 MOD 15 GWS Modification Type: SHIP ALT FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: DM003 - MK 160 MOD 15 GWS B Kits Recurring 1.1.1) MK 160 MOD 15 GWS EQUIPMENT NonOrganic (15) Subtotal: Recurring 29 / 98.293 - / - - / - / 98.293 - / - - / - 29 / 98.293 - / - - / - - / 98.293 - / - - / - - / 31.724 - / 2.599 - - / 31.724 - / 2.599 - Modification Item 1 of 1: DM003 - MK 160 MOD 15 GWS - / 31.280 - / 3.631 Subtotal: Installation - / 31.280 - / 3.631 Subtotal: DM003 - MK 160 MOD 15 GWS Subtotal: Procurement, All Modification Items - 2 / 7.958 - / - 2 / 7.958 / - - / 7.958 - / - - / 7.958 - / 8.118 - / 8.280 - / 4.223 - / 8.614 - / 79.634 / 2.646 - / 2.694 - / - - / 2.694 - / 2.742 - / 2.792 - / 2.842 - / 2.899 - / 41.532 - / 92.470 / 2.646 - / 2.694 - / - - / 2.694 - / 2.742 - / 2.792 - / 2.842 - / 2.899 - / 41.532 - / 92.470 - / 5.074 - / 2.040 / 0.000 - / 2.040 - / 1.244 - / 4.488 - / 4.398 - / 3.757 - / 38.452 - / 94.364 - / 5.074 - / 2.040 / - - / 2.040 - / 1.244 - / 4.488 - / 4.398 - / 3.757 - / 38.452 - / 94.364 - - 2 / 8.280 - 1 / 4.223 2 / 8.614 - / 79.634 53 / 215.120 / - 2 / 8.118 / 8.614 15 / 79.634 - - / 4.223 2 / 8.614 - 2 / 7.958 / 8.280 1 / 4.223 / 7.958 - / 8.118 2 / 8.280 2 / 7.958 - / 7.958 2 / 8.118 15 / 79.634 / 215.120 - 53 / 215.120 / 215.120 - Support (All Modification Items) 2.1) ENGINEERING SERVICES Subtotal: Support Installation - Total Total Cost (Procurement + Support + Installation) LI 0900 - DDG Mod Navy 161.297 6.230 7.720 12.692 0.000 UNCLASSIFIED Page 34 of 72 12.692 12.104 15.560 P-1 Line #5 11.463 15.270 159.618 401.954 Volume 1 - 162 === page 241 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 7 / DM003 - MK 160 MOD 15 GWS MDAP/MAIS Code: Modification Item 1 of 1: DM003 - MK 160 MOD 15 GWS Manufacturer Information Manufacturer Name: VARIOUS Manufacturer Location: VARIOUS Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 18 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2027 Mar 2028 Mar 2029 Jul 2030 Jul 2031 Delivery Dates Aug 2028 Aug 2029 Aug 2030 Jan 2032 Jan 2033 Installation Information Method of Implementation: [none specified]:: Installation Name: MK 160 MOD 15 GWS EQUIPMENT Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 23 / 31.280 29 / 41.831 Prior Years 2 / 3.631 3 / 5.074 1 / 1.846 0 / 0.000 1 / 1.846 - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - 0 / 0.194 0 / 0.000 0 / 0.194 0 / 1.044 2 / 3.226 - / - - / - 0 / 0.000 2 / 4.464 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 0.200 0 / 1.075 2 / 3.300 - / - 0 / 0.000 2 / 4.575 FY 2029 - / - - / - - / - - / - - / - - / - - / - 0 / 0.187 0 / 1.004 2 / 3.060 0 / 0.000 2 / 4.251 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.094 0 / 0.504 1 / 1.402 1 / 2.000 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.193 2 / 3.612 2 / 3.805 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 15 / 33.438 15 / 33.438 2 / 3.757 18 / 38.452 53 / 94.364 Total 23 / 31.280 2 / 3.631 3 / 5.074 1 / 2.040 0 / 0.000 1 / 2.040 0 / 1.244 2 / 4.488 2 / 4.398 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 23 1 1 - - - 1 1 1 - 1 - - - - - - - 1 - 1 - 1 1 - - - 1 1 18 53 Out 17 - - - - - - 1 23 53 - 1 1 1 - - 3 - 1 - 1 - 1 2 - 1 - - - - - Footnotes: (15) Prior year (FY23) procurement deferred from DDG 106 is planned for installation on DDG 102 in FY26. Prior year (FY22) procurement deferred from DDG 99 is planned for installation on DDG 101 in FY27. All budget requests have been adjusted to account for equipment utilization on DDG 102 and DDG 101. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 35 of 72 P-1 Line #5 Volume 1 - 163 === page 242 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0900 / DDG Mod ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 8 / DM004 - AWS UPGRADE MDAP/MAIS Code: Prior Years 1,239.557 1,239.557 1,239.557 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 79.574 96.914 89.882 0.000 89.882 72.695 - - - - - - 79.574 96.914 89.882 0.000 89.882 72.695 - - - - - - 79.574 96.914 89.882 0.000 89.882 72.695 114.907 114.907 114.907 106.554 106.554 106.554 To FY 2031 Complete 68.144 68.144 68.144 Total 1,553.557 3,421.784 1,553.557 3,421.784 1,553.557 3,421.784 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Procures equipment for the AEGIS Weapon System (AWS) Upgrades that includes equipment procurement, recurring engineering, equipment integration, installation and Integrated Logistics Support (ILS) products for DDG 51 Class ships. Engineering Services: Production Support Services are phased over a three (3) year span starting two (2) years prior to installation on a per hull basis. It includes five (5) elements that are related to the production and delivery of a usable end-item: Production Engineering, Quality Assurance, Product Improvement, Acceptance Test and Evaluation, and Contractor Engineering and Technical Services (CETS). Due to the phasing of the requirement over a three-year period, engineering services will fluctuate depending on the number of ships in each year. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 36 of 72 P-1 Line #5 Volume 1 - 164 === page 243 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 8 / DM004 - AWS UPGRADE MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Modification Type: SHIP ALT FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: DM004 - AWS UPGRADE B Kits Recurring 1.1.1) AWS EQUIPMENT - NonOrganic (16) Subtotal: Recurring Subtotal: DM004 - AWS UPGRADE Subtotal: Procurement, All Modification Items 29 / 592.344 - / - - / - / 592.344 - / - - / - 29 / 592.344 - / - - / - / 592.344 - / - - / - - - 2 / 44.850 - / - / 44.850 - / - 2 / 44.850 - / - / 44.850 - / - - - 2 / 44.850 / 44.850 - 2 / 45.748 2 / 44.850 / 44.850 - / 45.748 - 1 / 23.331 2 / 45.748 / 45.748 - / 23.331 - 1 / 23.798 1 / 23.331 / 23.331 - / 23.798 - 1 / 24.273 1 / 23.798 / 23.798 - / 24.273 - 1 / 24.273 / 24.273 - 17 / 496.412 / 496.412 - 17 / 496.412 / 496.412 - 53 / 1,250.756 / 1,250.756 - 53 / 1,250.756 / 1,250.756 - Support (All Modification Items) 2.1) ENGINEERING SERVICES Subtotal: Support - / 47.536 - / 4.356 - / 4.435 - / 4.514 - / - - / 4.514 - / 4.596 - / 4.678 - / 4.763 - / 4.858 - / 69.605 - / 149.341 - / 47.536 - / 4.356 - / 4.435 - / 4.514 - / - - / 4.514 - / 4.596 - / 4.678 - / 4.763 - / 4.858 - / 69.605 - / 149.341 Installation Modification Item 1 of 1: DM004 - AWS UPGRADE - / 599.677 - / 75.218 - / 92.479 - / 40.518 Subtotal: Installation - / 599.677 - / 75.218 - / 92.479 - / 40.518 - / 0.000 - / 40.518 - / 22.351 - / 86.898 - / 77.993 - / 39.013 - / 987.540 - / 2,021.687 / - - / 40.518 - / 22.351 - / 86.898 - / 77.993 - / 39.013 - / 987.540 - / 2,021.687 - Total Total Cost (Procurement + Support + Installation) LI 0900 - DDG Mod Navy 1,239.557 79.574 96.914 89.882 0.000 UNCLASSIFIED Page 37 of 72 89.882 72.695 114.907 P-1 Line #5 106.554 68.144 1,553.557 3,421.784 Volume 1 - 165 === page 244 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 8 / DM004 - AWS UPGRADE MDAP/MAIS Code: Modification Item 1 of 1: DM004 - AWS UPGRADE Manufacturer Information Manufacturer Name: VARIOUS Manufacturer Location: VARIOUS Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 24 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2027 Jan 2028 Apr 2029 Jun 2030 Jan 2031 Delivery Dates Jan 2029 Jan 2030 Apr 2031 Jun 2032 Jan 2033 Installation Information Method of Implementation: [none specified]:: Installation Name: AWS EQUIPMENT Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 23 / 599.677 2 / 75.218 3 / 92.479 1 / 36.823 0 / 0.000 1 / 36.823 29 / 804.197 Prior Years - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - 0 / 3.695 0 / 0.000 0 / 3.695 0 / 18.549 2 / 66.076 - / - - / - 0 / 0.000 2 / 88.320 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 3.802 0 / 19.087 2 / 67.499 - / - 0 / 0.000 2 / 90.388 FY 2029 - / - - / - - / - - / - - / - - / - - / - 0 / 1.735 0 / 8.709 1 / 28.215 0 / 0.000 1 / 38.659 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 1.785 0 / 8.961 1 / 28.929 1 / 39.675 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 1.837 1 / 44.125 1 / 45.962 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 17 / 914.486 17 / 914.486 1 / 39.013 19 / 987.540 53 / 2,021.687 Total 23 / 599.677 2 / 75.218 3 / 92.479 1 / 40.518 0 / 0.000 1 / 40.518 0 / 22.351 2 / 86.898 2 / 77.993 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 23 1 1 - - - 1 1 1 - 1 - - - - - - - 1 - 1 - 1 1 - - - 1 - 19 53 Out 17 - 3 - - - - - - 23 53 - 1 1 1 - - 1 - 1 - 1 2 - 1 - - - - - 1 Footnotes: (16) Prior year (FY23) procurement deferred from DDG 106 is planned for installation on DDG 102 in FY26. Prior year (FY22) procurement deferred from DDG 99 is planned for installation on DDG 101 in FY27. All budget requests have been adjusted to account for equipment utilization on DDG 102 and DDG 101. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 38 of 72 P-1 Line #5 Volume 1 - 166 === page 245 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0900 / DDG Mod ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 9 / DM005 - MULTI-MISSION SIGPRO MDAP/MAIS Code: Prior Years 606.028 606.028 606.028 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 30.141 18.488 5.848 0.000 5.848 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - 30.141 18.488 5.848 0.000 5.848 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - 30.141 18.488 5.848 0.000 5.848 0.000 0.000 0.000 0.000 0.000 Total 660.505 660.505 660.505 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Procures Multi-Mission SIGPRO combat systems that includes equipment procurement, recurring engineering, equipment integration and Integrated Logistics Support (ILS) products for DDG 51 Class ships. This upgrade is applicable only to hulls not receiving the SPY-6(V)4 radar upgrade. Engineering Services: Production Support Services are phased over a three (3) year span starting two (2) years prior to installation on a per hull basis. It includes five (5) elements that are related to the production and delivery of a usable end-item: Production Engineering, Quality Assurance, Product Improvement, Acceptance Test and Evaluation, and Contractor Engineering and Technical Services (CETS). Due to the three-year phasing to support these requirements, engineering services will fluctuate based on the procurements and installations planned. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 39 of 72 P-1 Line #5 Volume 1 - 167 === page 246 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Financial Plan Modification Number / Title: 9 / DM005 - MULTI-MISSION SIGPRO Modification Type: SHIP ALT FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: DM005 - MULTI-MISSION SIGPRO B Kits Recurring 1.1.1) MULTI-MISSION SIGPRO EQUIPMENT NonOrganic (17) Subtotal: Recurring Subtotal: DM005 - MULTI-MISSION SIGPRO Subtotal: Procurement, All Modification Items 29 / 476.958 / 476.958 - / 476.958 - / - - / - - / - - / - - / - - / - - / - - / - / 18.511 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 18.511 - / - - / - - / - - / - - / - - / - - / - - / - / 18.511 - / - - / - - / - - / - - / - - / - - / - - / - - 29 / 476.958 - 1 / 18.511 - - / / 0.000 - / / 0.000 - 30 / 495.469 / 495.469 - 30 / 495.469 / 495.469 - Support (All Modification Items) 2.1) ENGINEERING SERVICES - / 38.122 - / 3.716 - / 3.791 - / - - / - - / - - / - - / - - / - - / - / - - / 45.629 - / 38.122 - / 3.716 - / 3.791 - / - - / - - / - - / - - / - - / - - / - - / 0.000 - / 45.629 Modification Item 1 of 1: DM005 - MULTI-MISSION SIGPRO - / 90.948 - / 7.914 - / 14.697 - / 5.848 / 0.000 - / 0.000 - / 119.407 Subtotal: Installation - / 90.948 - / 7.914 - / 14.697 - / 5.848 / - - / 0.000 - / 119.407 Subtotal: Support - Installation - / 0.000 - / 5.848 / - - / 5.848 - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 0900 - DDG Mod Navy 606.028 30.141 18.488 5.848 0.000 UNCLASSIFIED Page 40 of 72 5.848 0.000 0.000 P-1 Line #5 0.000 0.000 0.000 660.505 Volume 1 - 168 === page 247 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 9 / DM005 - MULTI-MISSION SIGPRO MDAP/MAIS Code: Modification Item 1 of 1: DM005 - MULTI-MISSION SIGPRO Manufacturer Information Manufacturer Name: VARIOUS Manufacturer Location: VARIOUS Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 18 Dates FY 2025 Contract Dates May 2025 Delivery Dates Oct 2026 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: MULTI-MISSION SIGPRO EQUIPMENT Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 24 / 90.948 - Prior Years 2 / 7.734 3 / 13.547 - / - - / - - / - - / - - / - 0 / 0.000 29 / 112.229 FY 2025 - / - 0 / 0.180 0 / 1.150 1 / 5.848 0 / 0.000 1 / 5.848 - / - - / - - / - - / - 0 / 0.000 1 / 7.178 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 5.848 - / - - / - - / - - / - 0 / 0.000 Total 24 / 90.948 2 / 7.914 3 / 14.697 / - - 1 / 5.848 / - 0 / 0.000 30 / 119.407 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 24 1 1 - - - 1 1 1 - 1 - - - - - - - - - - - - - - - - - - - 30 Out 18 - - - - - - - - - - - - - 30 - 1 1 1 - - 3 - 1 - 1 - 1 2 - 1 Footnotes: (17) Prior year (FY23) procurement deferred from DDG 106 is planned for installation on DDG 102 in FY26. Prior year (FY22) procurement deferred from DDG 99 is planned for installation on DDG 103 in FY26. All budget requests have been adjusted to account for equipment utilization on DDG 102 and DDG 103. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 41 of 72 P-1 Line #5 Volume 1 - 169 === page 248 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0900 / DDG Mod ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 10 / DM006 - MULTI-MISSION SSA/CWI MICROWAVE TUBES MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 30.919 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 30.919 Total - - - - - - - - - - - - 30.919 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 30.919 - - - - - - - - - - - - 30.919 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 30.919 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Procures Multi-Mission Solid State Amplifier (SSA)/Continuous Wave Illumination (CWI) Microwave Tubes upgrades for DDG Modernization Program that includes equipment procurement, recurring engineering, equipment integration and Integrated Logistics Support (ILS) products for DDG 51 Class ships. This upgrade is applicable only to hulls not receiving the SPY-6(V)4 radar upgrade. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 42 of 72 P-1 Line #5 Volume 1 - 170 === page 249 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 10 / DM006 - MULTI-MISSION SSA/CWI MICROWAVE TUBES MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Modification Type: SHIP ALT FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: DM006 - MULTI-MISSION SSA/CWI MICROWAVE TUBES B Kits Recurring 1.1.1) MULTI-MISSION SSA/CWI MICROWAVE TUBES EQUIPMENT - Organic (18) Subtotal: Recurring Subtotal: DM006 - MULTI-MISSION SSA/CWI MICROWAVE TUBES Subtotal: Procurement, All Modification Items 29 / 30.919 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 30.919 - / - - / - - / - - / - - / - - / - - / - - / - - / - 29 / 30.919 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 30.919 - / - - / - - / - - / - - / - - / - - / - - / - - / - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - - - / / 0.000 - / / 0.000 - 29 / 30.919 - / 30.919 29 / 30.919 - / 30.919 Installation Subtotal: Installation - - / - - / - Total Total Cost (Procurement + Support + Installation) LI 0900 - DDG Mod Navy 30.919 0.000 0.000 0.000 0.000 UNCLASSIFIED Page 43 of 72 0.000 0.000 0.000 P-1 Line #5 0.000 0.000 0.000 30.919 Volume 1 - 171 === page 250 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0900 / DDG Mod ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 10 / DM006 - MULTI-MISSION SSA/CWI MICROWAVE TUBES MDAP/MAIS Code: Modification Item 1 of 1: DM006 - MULTI-MISSION SSA/CWI MICROWAVE TUBES Manufacturer Information Manufacturer Name: VARIOUS Manufacturer Location: VARIOUS Administrative Leadtime (in Months): 6 Dates FY 2025 Production Leadtime (in Months): 18 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Footnotes: (18) Prior year (FY23) procurement deferred from DDG 106 is planned for installation on DDG 102 in FY26. Prior year (FY22) procurement deferred from DDG 99 is planned for installation on DDG 101 in FY27. All budget requests have been adjusted to account for equipment utilization on DDG 102 and DDG 101. Installation efforts are accomplished via Alteration Installation Team (AITs) and the AEGIS Modernization Testing Team resourced in DM6IN. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 44 of 72 P-1 Line #5 Volume 1 - 172 === page 251 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0900 / DDG Mod ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 11 / DM008 - MULTI-MISSION BMD CAPABILITY CARDS MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 51.989 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 51.989 Total - - - - - - - - - - - - 51.989 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 51.989 - - - - - - - - - - - - 51.989 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 51.989 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Procures Multi-Mission Ballistic Missile Defense (BMD) Capability Cards combat systems that includes equipment procurement, recurring engineering, equipment integration and Integrated Logistics Support (ILS) products for DDG 51 Class ships. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 45 of 72 P-1 Line #5 Volume 1 - 173 === page 252 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Financial Plan Modification Number / Title: 11 / DM008 - MULTI-MISSION BMD CAPABILITY CARDS Modification Type: SHIP ALT FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: DM008 - MULTI-MISSION BMD CAPABILITY CARDS B Kits Recurring 1.1.1) MULTI-MISSION BMD EQUIPMENT - Organic (19) Subtotal: Recurring Subtotal: DM008 - MULTI-MISSION BMD CAPABILITY CARDS Subtotal: Procurement, All Modification Items 29 / 51.989 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 51.989 - / - - / - - / - - / - - / - - / - - / - - / - - / - 29 / 51.989 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 51.989 - / - - / - - / - - / - - / - - / - - / - - / - - / - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - - - / / 0.000 - / / 0.000 - 29 / 51.989 - / 51.989 29 / 51.989 - / 51.989 Installation Subtotal: Installation - - / - - / - Total Total Cost (Procurement + Support + Installation) LI 0900 - DDG Mod Navy 51.989 0.000 0.000 0.000 0.000 UNCLASSIFIED Page 46 of 72 0.000 0.000 0.000 P-1 Line #5 0.000 0.000 0.000 51.989 Volume 1 - 174 === page 253 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0900 / DDG Mod ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 11 / DM008 - MULTI-MISSION BMD CAPABILITY CARDS MDAP/MAIS Code: Modification Item 1 of 1: DM008 - MULTI-MISSION BMD CAPABILITY CARDS Manufacturer Information Manufacturer Name: LOCKHEED MARTIN Manufacturer Location: MOORESTOWN, NJ Administrative Leadtime (in Months): 6 Dates FY 2025 Production Leadtime (in Months): 18 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Footnotes: (19) Installation efforts are accomplished via Alteration Installation Team (AITs) and the AEGIS Modernization Testing Team resourced in DM6IN. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 47 of 72 P-1 Line #5 Volume 1 - 175 === page 254 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0900 / DDG Mod ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 12 / DM009 - VLS UPGRADES MDAP/MAIS Code: Prior Years 280.999 280.999 280.999 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - 11.775 14.089 22.271 0.000 22.271 21.195 26.721 20.333 19.504 - - - - - - - - - 11.775 14.089 22.271 0.000 22.271 21.195 26.721 20.333 19.504 - - - - - - - - - 11.775 14.089 22.271 0.000 22.271 21.195 26.721 20.333 19.504 Total 305.740 722.627 305.740 722.627 305.740 722.627 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Procures Vertical Launch System (VLS) Modifications, Evolved Sea Sparrow Missile VLS Modifications, SM3 Operability Heating Ventilation Air Conditioning (HVAC) and VLS MODS for SM3 Block 3 combat systems that includes equipment procurement, recurring engineering, equipment integration and Integrated Logistics Support (ILS) products for DDG 51 Class ships. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 48 of 72 P-1 Line #5 Volume 1 - 176 === page 255 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 12 / DM009 - VLS UPGRADES MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Modification Type: SHIP ALT FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: DM009 - VLS UPGRADES B Kits Recurring 1.1.1) VLS EQUIPMENT - NonOrganic (20) Subtotal: Recurring Subtotal: DM009 - VLS UPGRADES Subtotal: Procurement, All Modification Items 29 / 165.061 - / - - / - / 165.061 - / - - / - 29 / 165.061 - / - - / - / 165.061 - / - - / - - - 2 / 12.516 - / - / 12.516 - / - 2 / 12.516 - / - / 12.516 - / - - - 2 / 12.516 / 12.516 - 2 / 12.766 2 / 12.516 / 12.516 - / 12.766 - 2 / 13.022 2 / 12.766 / 12.766 - / 13.022 - 1 / 6.641 - 2 / 13.022 - / 6.641 1 / 6.774 - 1 / 6.641 / 6.774 1 / 6.774 16 / 132.019 / 132.019 - 16 / 132.019 53 / 348.799 - / 348.799 53 / 348.799 / 13.022 - / 6.641 - / 6.774 - / 132.019 - / 348.799 Support (All Modification Items) 2.1) ENGINEERING SERVICES - / 67.914 - / 6.279 - / 6.392 - / 6.507 - / - - / 6.507 - / 6.624 - / 6.744 - / 6.865 - / 7.002 - / 100.323 - / 214.650 - / 67.914 - / 6.279 - / 6.392 - / 6.507 - / - - / 6.507 - / 6.624 - / 6.744 - / 6.865 - / 7.002 - / 100.323 - / 214.650 Modification Item 1 of 1: DM009 - VLS UPGRADES - / 48.024 - / 5.496 - / 7.697 - / 3.248 / 0.000 - / 3.248 - / 1.805 - / 6.955 - / 6.827 - / 5.728 - / 73.398 - / 159.178 Subtotal: Installation - / 48.024 - / 5.496 - / 7.697 - / 3.248 / - - / 3.248 - / 1.805 - / 6.955 - / 6.827 - / 5.728 - / 73.398 - / 159.178 Subtotal: Support Installation - Total Total Cost (Procurement + Support + Installation) LI 0900 - DDG Mod Navy 280.999 11.775 14.089 22.271 0.000 UNCLASSIFIED Page 49 of 72 22.271 21.195 26.721 P-1 Line #5 20.333 19.504 305.740 722.627 Volume 1 - 177 === page 256 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 12 / DM009 - VLS UPGRADES MDAP/MAIS Code: Modification Item 1 of 1: DM009 - VLS UPGRADES Manufacturer Information Manufacturer Name: LOCKHEED MARTIN Manufacturer Location: MOORESTOWN, NJ Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 18 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2027 Mar 2028 Mar 2029 Jul 2030 Mar 2031 Delivery Dates Aug 2028 Aug 2029 Aug 2030 Jan 2031 Aug 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: VLS EQUIPMENT Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 23 / 48.024 29 / 64.159 Prior Years 2 / 5.496 3 / 7.697 1 / 2.942 0 / 0.000 1 / 2.942 - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - 0 / 0.306 0 / 0.000 0 / 0.306 0 / 1.491 2 / 5.127 - / - - / - 0 / 0.000 2 / 6.924 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 0.314 0 / 1.534 2 / 5.246 - / - 0 / 0.000 2 / 7.094 FY 2029 - / - - / - - / - - / - - / - - / - - / - 0 / 0.294 0 / 1.433 2 / 4.856 0 / 0.000 2 / 6.583 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.148 0 / 0.720 1 / 2.221 1 / 3.089 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.152 1 / 3.460 1 / 3.612 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 16 / 67.717 16 / 67.717 2 / 5.728 18 / 73.398 53 / 159.178 Total 23 / 48.024 2 / 5.496 3 / 7.697 1 / 3.248 0 / 0.000 1 / 3.248 0 / 1.805 2 / 6.955 2 / 6.827 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 23 1 1 - - - 1 1 1 - - 1 - - - - - - 1 - 1 - 1 1 - - - 1 1 18 53 Out 17 - 1 - - - - - - - 1 23 53 - 1 1 1 - - 3 - 1 1 2 - 1 - - - - - Footnotes: (20) Prior year (FY23) procurement deferred from DDG 106 is planned for installation on DDG 102 in FY26. Prior year (FY22) procurement deferred from DDG 99 is planned for installation on DDG 101 in FY27. All budget requests have been adjusted to account for equipment utilization on DDG 102 and DDG 101. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 50 of 72 P-1 Line #5 Volume 1 - 178 === page 257 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0900 / DDG Mod ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 13 / DM011 - AN/SQQ-89 A(V15) MDAP/MAIS Code: Prior Years 179.789 179.789 179.789 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 4.234 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - 4.234 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - 4.234 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Total 184.023 184.023 184.023 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Procures improved AN/SQQ-89(V)15 with Multi-Function Towed Array (MFTA) to replace the installed MIL-STD AN/SQQ-89(V) including equipment procurement, recurring engineering, equipment integration, installation and Integrated Logistics Support (ILS) products for DDG 51 Class ships.SQQ-89 will complete its last install on DDG 78. Engineering Services: Production Support Services are phased over a three (3) year span starting two (2) years prior to installation on a per hull basis. It includes five (5) elements that are related to the production and delivery of a usable end-item: Production Engineering, Quality Assurance, Product Improvement, Acceptance Test and Evaluation, and Contractor Engineering and Technical Services (CETS). Due to the phasing of the requirement over a three year period, engineering services will fluctuate depending on the number of ships in each year. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 51 of 72 P-1 Line #5 Volume 1 - 179 === page 258 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Financial Plan Modification Number / Title: 13 / DM011 - AN/SQQ-89 A(V15) Modification Type: SHIP ALT FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: DM011 - AN/SQQ-89 A(V15) B Kits Recurring 1.1.1) AN/SQQ-89 EQUIPMENT A(V15) - NonOrganic (21) Subtotal: Recurring 12 / 94.095 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 94.095 - / - - / - - / - - / - - / - - / - - / - - / - - / - 12 / 94.095 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 94.095 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 32.778 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 32.778 - / - - / - - / - - / - - / - - / - - / - - / - - / - - Modification Item 1 of 1: DM011 - AN/SQQ-89 A(V15) - / 52.916 - / 4.234 / 0.000 - Subtotal: Installation - / 52.916 - / 4.234 / - - Subtotal: DM011 - AN/SQQ-89 A(V15) Subtotal: Procurement, All Modification Items - / / 0.000 - / - 12 / 94.095 - / 94.095 12 / 94.095 / 0.000 - / 94.095 / - - / 32.778 / 0.000 - / 32.778 / 0.000 - / 57.150 / 0.000 - / 57.150 Support (All Modification Items) 2.1) ENGINEERING SERVICES Subtotal: Support - Installation - / 0.000 - / - - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 0900 - DDG Mod Navy 179.789 4.234 0.000 0.000 0.000 UNCLASSIFIED Page 52 of 72 0.000 0.000 0.000 P-1 Line #5 0.000 0.000 0.000 184.023 Volume 1 - 180 === page 259 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 13 / DM011 - AN/SQQ-89 A(V15) MDAP/MAIS Code: Modification Item 1 of 1: DM011 - AN/SQQ-89 A(V15) Manufacturer Information Manufacturer Name: LOCKHEED MARTIN Manufacturer Location: SYRACUSE, NY Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 18 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: [none specified]:: Installation Name: AN/SQQ-89 EQUIPMENT A(V15) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 11 / 52.916 12 / 57.150 Prior Years 1 / 4.234 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 4.234 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 11 / 52.916 12 / 57.150 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 11 - - 1 - - - - - - - - - - - - - - - - - - - - - - - - - - 12 Out 11 - - - - - - - - - - - - - - - - - - - - - - - - - - - 12 - 1 Footnotes: (21) Prior year procurement for DDG 78 installation in FY25. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 53 of 72 P-1 Line #5 Volume 1 - 181 === page 260 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0900 / DDG Mod ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 14 / DM013 - (1 MC/DIAS UPGRADE) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 81.329 12.281 16.346 5.761 0.000 5.761 3.738 11.749 11.785 11.203 - - - - - - - - - - 81.329 12.281 16.346 5.761 0.000 5.761 3.738 11.749 11.785 11.203 - - - - - - - - - - 81.329 12.281 16.346 5.761 0.000 5.761 3.738 11.749 11.785 11.203 119.973 119.973 119.973 Total 274.165 274.165 274.165 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Procures the Dynalec Integrated Announcing System (DIAS) that replaces the ship's existing obsolete and unreliable general announcing system, enabling controlling watch stations to announce ship critical information to the crew. Integrated Logistics Support includes development of ILS documentation, review and certification. Environmental Quality Testing includes Shock, Vibration and Electromagnetic Interference (EMI) certification to ensure DIAS meets survivability requirements. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 54 of 72 P-1 Line #5 Volume 1 - 182 === page 261 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 14 / DM013 - (1 MC/DIAS UPGRADE) MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Modification Type: SHIP ALT FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: DM013 - (1 MC/DIAS UPGRADE) B Kits Recurring 1.1.1) 1 MC/DIAS EQUIPMENT - NonOrganic (22) Subtotal: Recurring 32 / 6.744 - / - - / - / 6.744 - / - - / - 32 / 6.744 - / - - / - / 6.744 - / - - / - - Subtotal: DM013 - (1 MC/DIAS UPGRADE) Subtotal: Procurement, All Modification Items - 2 / 0.686 - / - 2 / 0.686 2 / 0.714 / / - - / 0.686 - / - - / 0.686 - / 0.700 / 0.000 - / 5.075 - / 3.038 - / 11.035 - / 11.057 - / 10.461 - / 113.472 - / 257.350 / - - / 5.075 - / 3.038 - / 11.035 - / 11.057 - / 10.461 - / 113.472 - / 257.350 - 2 / 0.700 - 2 / 0.714 - - 2 / 0.728 / 0.714 - / 0.742 56 / 16.815 - - / 0.728 14 / 6.501 - 2 / 0.686 / 0.714 2 / 0.742 / 0.686 - / 0.700 2 / 0.728 2 / 0.686 - / 0.686 2 / 0.700 - 2 / 0.742 / 0.728 - / 6.501 - 14 / 6.501 / 0.742 - / 16.815 56 / 16.815 / 6.501 - / 16.815 Installation Modification Item 1 of 1: DM013 - (1 MC/DIAS UPGRADE) - / 74.585 - / 12.281 - / 16.346 - / 5.075 Subtotal: Installation - / 74.585 - / 12.281 - / 16.346 - / 5.075 - Total Total Cost (Procurement + Support + Installation) LI 0900 - DDG Mod Navy 81.329 12.281 16.346 5.761 0.000 UNCLASSIFIED Page 55 of 72 5.761 3.738 11.749 P-1 Line #5 11.785 11.203 119.973 274.165 Volume 1 - 183 === page 262 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 14 / DM013 - (1 MC/DIAS UPGRADE) MDAP/MAIS Code: Modification Item 1 of 1: DM013 - (1 MC/DIAS UPGRADE) Manufacturer Information Manufacturer Name: NAVAL INFORMATION WARFARE CENTER ATLANTIC Manufacturer Location: CHARLESTON, SC Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 16 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2027 Mar 2028 Mar 2029 Jul 2030 Mar 2031 Delivery Dates Jul 2028 Jun 2029 Jun 2030 Nov 2031 Jun 2032 Installation Information Method of Implementation: [none specified]:: Installation Name: 1 MC/DIAS EQUIPMENT Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 24 / 74.585 3 / 12.281 4 / 16.346 32 / 107.793 Prior Years 1 / 4.581 0 / 0.000 1 / 4.581 - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - 0 / 0.494 0 / 0.000 0 / 0.494 0 / 2.529 2 / 7.958 - / - - / - 0 / 0.000 2 / 10.981 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 0.509 0 / 2.602 2 / 8.148 - / - 0 / 0.000 2 / 11.259 FY 2029 - / - - / - - / - - / - - / - - / - - / - 0 / 0.475 0 / 2.432 2 / 7.526 0 / 0.000 2 / 10.433 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.477 0 / 2.444 2 / 8.509 2 / 11.430 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.491 2 / 10.969 2 / 11.460 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 14 / 93.994 14 / 93.994 2 / 10.461 18 / 113.472 56 / 257.350 Total 24 / 74.585 3 / 12.281 4 / 16.346 1 / 5.075 0 / 0.000 1 / 5.075 0 / 3.038 2 / 11.035 2 / 11.057 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 24 1 1 1 - - 1 1 2 - 1 - - - - - - - 1 - 1 - 1 1 - - - 1 1 18 56 Out 19 1 1 - - - - - - 1 23 56 - 1 - - 3 - 2 - 1 - 1 2 - 1 - - - - - Footnotes: (22) Prior year (FY23) procurement deferred from DDG 106 is planned for installation on DDG 102 in FY26. Prior year (FY22) procurement deferred from DDG 99 is planned for installation on DDG 101 in FY27. All budget requests have been adjusted to account for equipment utilization on DDG 102 and DDG 101. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 56 of 72 P-1 Line #5 Volume 1 - 184 === page 263 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0900 / DDG Mod ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 15 / DM013 - (MORIAH WIND SYSTEM) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 34.281 2.970 2.070 1.562 0.000 1.562 1.058 1.617 0.935 1.006 0.000 45.499 Total - - - - - - - - - - - - 34.281 2.970 2.070 1.562 0.000 1.562 1.058 1.617 0.935 1.006 0.000 45.499 - - - - - - - - - - - - 34.281 2.970 2.070 1.562 0.000 1.562 1.058 1.617 0.935 1.006 0.000 45.499 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Procures the Moriah Wind System (MWS) that provides DDGs with a digital wind speed and directional information to support safe execution of air, combat and casualty operations. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 57 of 72 P-1 Line #5 Volume 1 - 185 === page 264 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Financial Plan Modification Number / Title: 15 / DM013 - (MORIAH WIND SYSTEM) Modification Type: SHIP ALT FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: DM013 - (MORIAH WIND SYSTEM) B Kits Recurring 1.1.1) MORIAH WIND SYSTEM EQUIPMENT NonOrganic (23) Subtotal: Recurring 31 / 6.641 - / - - / - / 6.641 - / - - / - 31 / 6.641 - / - - / - / 6.641 - / - - / - - Subtotal: DM013 - (MORIAH WIND SYSTEM) Subtotal: Procurement, All Modification Items - 1 / 0.356 - / - / 0.356 - / - 1 / 0.356 - / - - / 0.356 - / - - 1 / 0.356 - / - / 0.356 - / - 1 / 0.356 - / - - / 0.356 - / - / 0.000 - / 1.206 - / - - / 1.206 - - 1 / 0.370 - / - - / - - / - 33 / 7.367 / 0.370 - / - - / - 1 / 0.370 - / - - / - - / 0.370 - / - - / - - / 0.000 / 1.058 - / 1.247 - / 0.935 - / 1.006 - / 0.000 - / 38.132 / 1.058 - / 1.247 - / 0.935 - / 1.006 - / 0.000 - / 38.132 - / 0.000 - - / - / 7.367 33 / 7.367 - / 7.367 Installation Modification Item 1 of 1: DM013 - (MORIAH WIND SYSTEM) - / 27.640 - / 2.970 - / 2.070 - / 1.206 Subtotal: Installation - / 27.640 - / 2.970 - / 2.070 - / 1.206 - Total Total Cost (Procurement + Support + Installation) LI 0900 - DDG Mod Navy 34.281 2.970 2.070 1.562 0.000 UNCLASSIFIED Page 58 of 72 1.562 1.058 1.617 P-1 Line #5 0.935 1.006 0.000 45.499 Volume 1 - 186 === page 265 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 15 / DM013 - (MORIAH WIND SYSTEM) MDAP/MAIS Code: Modification Item 1 of 1: DM013 - (MORIAH WIND SYSTEM) Manufacturer Information Manufacturer Name: NAWCAD LAKEHURST Manufacturer Location: LAKEHURST, NJ Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 16 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Mar 2027 Mar 2029 Delivery Dates Jul 2028 Jun 2030 FY 2030 FY 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: MORIAH WIND SYSTEM EQUIPMENT Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 25 / 27.640 31 / 33.781 Prior Years 3 / 2.970 2 / 2.070 1 / 1.101 0 / 0.000 1 / 1.101 - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - 0 / 0.105 0 / 0.000 0 / 0.105 0 / 1.058 1 / 1.154 - / - - / - 0 / 0.000 FY 2028 - / - - / - - / - - / - - / - - / - - / - - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - 0 / 0.093 0 / 0.935 1 / 1.006 0 / 0.000 1 / 2.034 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 25 / 27.640 3 / 2.970 2 / 2.070 1 / 1.206 0 / 0.000 1 / 1.206 0 / 1.058 / - 1 / 1.247 0 / 0.935 - 1 / 1.006 1 / 2.317 / - - 0 / 0.000 / - 33 / 38.132 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 25 1 1 1 - - 1 - 1 - 1 - - - - - - - - - 1 - - - - - - - 1 - 33 Out 19 1 1 - - - - - - - - - - - 1 - - 3 - 2 - 1 - 1 - 1 1 - - 2 33 Footnotes: (23) Prior year procurements support planned installations through FY2027. All budget requests have been adjusted to account for equipment utilization. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 59 of 72 P-1 Line #5 Volume 1 - 187 === page 266 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0900 / DDG Mod ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 16 / DM013 - (IVCS UPGRADE) MDAP/MAIS Code: Prior Years 151.506 151.506 151.506 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - 18.284 23.411 16.695 0.000 16.695 11.868 28.665 28.878 27.787 - - - - - - - - - 18.284 23.411 16.695 0.000 16.695 11.868 28.665 28.878 27.787 - - - - - - - - - 18.284 23.411 16.695 0.000 16.695 11.868 28.665 28.878 27.787 288.096 288.096 288.096 Total 595.190 595.190 595.190 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Procures the AN/STC-3(V)3 Internal Voice Communication System (IVCS) that replaces the ship's existing obsolete telephone services system that provides voice communications between spaces in the ship, along with ship to shore services. Integrated Logistics Support includes development of ILS documentation, review and certification. Environmental Quality Testing includes Shock, Vibration and EMI certification to ensure IVCS meets survivability requirements. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 60 of 72 P-1 Line #5 Volume 1 - 188 === page 267 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 16 / DM013 - (IVCS UPGRADE) MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Modification Type: SHIP ALT FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: DM013 - (IVCS UPGRADE) B Kits Recurring 1.1.1) IVCS EQUIPMENT - NonOrganic (24) Subtotal: Recurring 22 / 49.513 - / - - / - / 49.513 - / - - / - 22 / 49.513 - / - - / - / 49.513 - / - - / - - Subtotal: DM013 - (IVCS UPGRADE) Subtotal: Procurement, All Modification Items - - - 2 / 6.186 - / - / 6.186 - / - 2 / 6.186 - / - / 6.186 - / - 2 / 6.186 - / 6.186 2 / 6.308 - 2 / 6.186 - 2 / 6.434 / 6.308 - 2 / 6.308 / 6.186 - / 6.308 2 / 6.564 / 6.434 - 2 / 6.434 - 2 / 6.694 / 6.564 - 2 / 6.564 / 6.434 - 14 / 58.615 / 6.694 - 2 / 6.694 / 6.564 - / 58.615 14 / 58.615 / 6.694 - 46 / 140.314 - / 140.314 46 / 140.314 / 58.615 - / 140.314 Installation Modification Item 1 of 1: DM013 - (IVCS UPGRADE) - / 101.993 - / 18.284 - / 23.411 - / 10.509 Subtotal: Installation - / 101.993 - / 18.284 - / 23.411 - / 10.509 - / 0.000 - / 10.509 - / 5.560 - / 22.231 - / 22.314 - / 21.093 - / 229.481 - / 454.876 / - - / 10.509 - / 5.560 - / 22.231 - / 22.314 - / 21.093 - / 229.481 - / 454.876 - Total Total Cost (Procurement + Support + Installation) LI 0900 - DDG Mod Navy 151.506 18.284 23.411 16.695 0.000 UNCLASSIFIED Page 61 of 72 16.695 11.868 28.665 P-1 Line #5 28.878 27.787 288.096 595.190 Volume 1 - 189 === page 268 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 16 / DM013 - (IVCS UPGRADE) MDAP/MAIS Code: Modification Item 1 of 1: DM013 - (IVCS UPGRADE) Manufacturer Information Manufacturer Name: NAVAL INFORMATION WARFARE CENTER ATLANTIC Manufacturer Location: CHARLESTON, SC Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 16 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2027 Mar 2028 Mar 2029 Jul 2030 Mar 2031 Delivery Dates Jul 2028 Jun 2029 Jun 2030 Nov 2031 Jun 2032 Installation Information Method of Implementation: [none specified]:: Installation Name: IVCS EQUIPMENT Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 16 / 101.993 2 / 18.284 3 / 23.411 22 / 153.220 Prior Years 1 / 9.532 0 / 0.000 1 / 9.532 - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - 0 / 0.977 0 / 0.000 0 / 0.977 0 / 4.555 2 / 16.604 - / - - / - 0 / 0.000 2 / 22.136 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 1.005 0 / 4.687 2 / 16.990 - / - 0 / 0.000 2 / 22.682 FY 2029 - / - - / - - / - - / - - / - - / - - / - 0 / 0.940 0 / 4.380 2 / 15.721 0 / 0.000 2 / 21.041 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.944 0 / 4.401 2 / 17.728 2 / 23.073 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.971 2 / 22.147 2 / 23.118 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 14 / 189.606 14 / 189.606 2 / 21.093 18 / 229.481 46 / 454.876 Total 16 / 101.993 2 / 18.284 3 / 23.411 1 / 10.509 0 / 0.000 1 / 10.509 0 / 5.560 2 / 22.231 2 / 22.314 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 16 1 1 - - - 1 1 1 - 1 - - - - - - - 1 - 1 - 1 1 - - - 1 1 18 46 Out 10 - - - - - - 1 23 46 - 1 1 1 - - 3 - 1 - 1 - 1 2 - 1 - - - - - Footnotes: (24) Prior year (FY23) procurement deferred from DDG 106 is planned for installation on DDG 102 in FY26. Prior year (FY22) procurement deferred from DDG 99 is planned for installation on DDG 101 in FY27. All budget requests have been adjusted to account for equipment utilization on DDG 102 and DDG 101. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 62 of 72 P-1 Line #5 Volume 1 - 190 === page 269 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0900 / DDG Mod ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 17 / DM013 - Slewing Arm Davit (SLAD) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 16.399 0.797 0.986 1.887 0.000 1.887 1.643 2.401 2.437 2.418 23.049 52.017 Total - - - - - - - - - - - - 16.399 0.797 0.986 1.887 0.000 1.887 1.643 2.401 2.437 2.418 23.049 52.017 - - - - - - - - - - - - 16.399 0.797 0.986 1.887 0.000 1.887 1.643 2.401 2.437 2.418 23.049 52.017 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Procures Slewing Arm Davit (SLAD) that replaces current SLAD with an all-electric davit, leveraging the current Navy Standard SLAD design. Legacy system has documented reliability and maintenance issues. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 63 of 72 P-1 Line #5 Volume 1 - 191 === page 270 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 17 / DM013 - Slewing Arm Davit (SLAD) MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Modification Type: SHIP ALT FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: DM013 - Slewing Arm Davit (SLAD) B Kits Recurring 1.1.1) SLAD EQUIPMENT - NonOrganic (25) Subtotal: Recurring Subtotal: DM013 - Slewing Arm Davit (SLAD) Subtotal: Procurement, All Modification Items 22 / 11.559 - / - - / - / 11.559 - / - - / - 22 / 11.559 - / - - / - / 11.559 - / - - / - - - 2 / 1.434 - / - 2 / 1.434 / - - / - - / 1.434 - / - - / 1.434 - / 1.464 - / 1.492 - / 1.522 - / 1.552 / 0.000 - / 0.453 - / 0.179 - / 0.909 - / 0.915 - / 0.866 / - - / 0.453 - / 0.179 - / 0.909 - / 0.915 - / 0.866 - - 2 / 1.464 - 2 / 1.492 / 1.522 2 / 1.552 - 2 / 1.434 / 1.492 2 / 1.522 / 1.434 - / 1.464 2 / 1.492 2 / 1.434 - / 1.434 2 / 1.464 - 2 / 1.522 / 1.552 2 / 1.552 14 / 13.591 / 13.591 - 14 / 13.591 46 / 32.614 - / 32.614 46 / 32.614 / 13.591 - / 32.614 - / 9.458 - / 19.403 - / 9.458 - / 19.403 - Installation Modification Item 1 of 1: DM013 - Slewing Arm Davit (SLAD) - / 4.840 - / 0.797 - / 0.986 - / 0.453 Subtotal: Installation - / 4.840 - / 0.797 - / 0.986 - / 0.453 - Total Total Cost (Procurement + Support + Installation) LI 0900 - DDG Mod Navy 16.399 0.797 0.986 1.887 0.000 UNCLASSIFIED Page 64 of 72 1.887 1.643 2.401 P-1 Line #5 2.437 2.418 23.049 52.017 Volume 1 - 192 === page 271 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 17 / DM013 - Slewing Arm Davit (SLAD) MDAP/MAIS Code: Modification Item 1 of 1: DM013 - Slewing Arm Davit (SLAD) Manufacturer Information Manufacturer Name: APPLETON MARINE Manufacturer Location: APPLETON, WI Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 16 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2027 Mar 2028 Mar 2029 Jul 2030 Jul 2031 Delivery Dates Jul 2028 Jun 2029 Jun 2030 Nov 2031 Nov 2032 Installation Information Method of Implementation: [none specified]:: Installation Name: SLAD EQUIPMENT Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 16 / 4.840 22 / 7.038 Prior Years 2 / 0.797 3 / 0.986 1 / 0.415 0 / 0.000 1 / 0.415 - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - 0 / 0.038 0 / 0.000 0 / 0.038 0 / 0.140 2 / 0.729 - / - - / - 0 / 0.000 2 / 0.907 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 0.039 0 / 0.144 2 / 0.745 - / - 0 / 0.000 2 / 0.928 FY 2029 - / - - / - - / - - / - - / - - / - - / - 0 / 0.036 0 / 0.134 2 / 0.693 0 / 0.000 2 / 0.863 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.036 0 / 0.135 2 / 0.776 2 / 0.947 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.038 2 / 0.910 2 / 0.948 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 14 / 7.772 14 / 7.772 2 / 0.866 18 / 9.458 46 / 19.403 Total 16 / 4.840 2 / 0.797 3 / 0.986 1 / 0.453 0 / 0.000 1 / 0.453 0 / 0.179 2 / 0.909 2 / 0.915 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 16 1 1 - - - 1 1 1 - 1 - - - - - - - 1 - 1 - 1 1 - - - 1 1 18 46 Out 10 - - - - - - 1 23 46 - 1 1 1 - - 3 - 1 - 1 - 1 2 - 1 - - - - - Footnotes: (25) Prior year (FY23) procurement deferred from DDG 106 is planned for installation on DDG 102 in FY26. Prior year (FY22) procurement deferred from DDG 99 is planned for installation on DDG 101 in FY27. All budget requests have been adjusted to account for equipment utilization on DDG 102 and DDG 101. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 65 of 72 P-1 Line #5 Volume 1 - 193 === page 272 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0900 / DDG Mod ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 18 / DM013 - AN/SPA-25 MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 13.282 1.203 2.046 0.670 0.000 0.670 1.966 2.259 2.178 2.177 20.630 46.411 Total - - - - - - - - - - - - 13.282 1.203 2.046 0.670 0.000 0.670 1.966 2.259 2.178 2.177 20.630 46.411 - - - - - - - - - - - - 13.282 1.203 2.046 0.670 0.000 0.670 1.966 2.259 2.178 2.177 20.630 46.411 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Procures current configuration of AN/SPA-25 Radar Indicator Group that replaces the legacy AN/SPA-25G. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 66 of 72 P-1 Line #5 Volume 1 - 194 === page 273 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 18 / DM013 - AN/SPA-25 MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Modification Type: SHIP ALT FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: DM013 - AN/SPA-25 B Kits Recurring 21 / 4.460 - / - - / - / 4.460 - / - - / - 21 / 4.460 - / - - / - - / 4.460 - / - - / - Modification Item 1 of 1: DM013 - AN/SPA-25 - / 8.822 - / 1.203 - Subtotal: Installation - / 8.822 - / 1.203 - 1.1.1) AN/SPA-25 EQUIPMENT - NonOrganic (26) Subtotal: Recurring Subtotal: DM013 - AN/SPA-25 Subtotal: Procurement, All Modification Items - 2 / 0.440 - / - / 0.440 - / - 2 / 0.440 - / - - / 0.440 - / - - / 0.440 - / 0.448 - / 0.458 - / 0.466 - / 0.476 / 2.046 - / 0.230 / 0.000 - / 0.230 - / 1.518 - / 1.801 - / 1.712 - / 1.701 / 2.046 - / 0.230 / - - / 0.230 - / 1.518 - / 1.801 - / 1.712 - / 1.701 - 2 / 0.440 - / 0.440 2 / 0.448 - 2 / 0.440 / 0.448 2 / 0.458 - 2 / 0.448 / 0.458 2 / 0.466 - 2 / 0.458 / 0.466 2 / 0.476 - 2 / 0.466 14 / 4.161 / 0.476 - 2 / 0.476 / 4.161 14 / 4.161 45 / 10.909 - / 10.909 45 / 10.909 / 4.161 - / 10.909 - / 16.469 - / 35.502 - / 16.469 - / 35.502 - Installation - Total Total Cost (Procurement + Support + Installation) LI 0900 - DDG Mod Navy 13.282 1.203 2.046 0.670 0.000 UNCLASSIFIED Page 67 of 72 0.670 1.966 2.259 P-1 Line #5 2.178 2.177 20.630 46.411 Volume 1 - 195 === page 274 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 18 / DM013 - AN/SPA-25 MDAP/MAIS Code: Modification Item 1 of 1: DM013 - AN/SPA-25 Manufacturer Information Manufacturer Name: CDSA DAM NECK Manufacturer Location: DAM NECK, VA Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 16 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Mar 2027 Mar 2028 Mar 2029 Jul 2030 Mar 2031 Delivery Dates Jul 2028 Jun 2029 Jun 2030 Nov 2031 Jun 2032 Installation Information Method of Implementation: [none specified]:: Installation Name: AN/SPA-25 EQUIPMENT Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 15 / 8.822 21 / 12.214 Prior Years 2 / 1.203 3 / 2.046 1 / 0.143 0 / 0.000 1 / 0.143 - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - 0 / 0.087 0 / 0.000 0 / 0.087 0 / 1.429 2 / 0.248 - / - - / - 0 / 0.000 2 / 1.764 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 0.089 0 / 1.470 2 / 0.254 - / - 0 / 0.000 2 / 1.813 FY 2029 - / - - / - - / - - / - - / - - / - - / - 0 / 0.083 0 / 1.374 2 / 0.235 0 / 0.000 2 / 1.692 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.084 0 / 1.380 2 / 0.265 2 / 1.729 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.086 2 / 1.684 2 / 1.770 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 14 / 14.520 14 / 14.520 2 / 1.701 18 / 16.469 45 / 35.502 Total 15 / 8.822 2 / 1.203 3 / 2.046 1 / 0.230 0 / 0.000 1 / 0.230 0 / 1.518 2 / 1.801 2 / 1.712 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 15 1 1 - - - 1 1 1 - 1 - - - - - - - 1 - 1 - 1 1 - - - 1 1 18 45 Out 9 - - - - - - 1 23 45 - 1 1 1 - - 3 - 1 - 1 - 1 2 - 1 - - - - - Footnotes: (26) Prior year (FY23) procurement deferred from DDG 106 is planned for installation on DDG 102 in FY26. Prior year (FY22) procurement deferred from DDG 99 is planned for installation on DDG 101 in FY27. All budget requests have been adjusted to account for equipment utilization on DDG 102 and DDG 101. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 68 of 72 P-1 Line #5 Volume 1 - 196 === page 275 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0900 / DDG Mod ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 19 / DM014 SOLID STATE RADAR EQUIPMENT MDAP/MAIS Code: Prior Years 353.716 353.716 353.716 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 357.623 357.623 357.623 150.994 150.994 150.994 502.774 - 0.000 - 502.774 - 0.000 - 502.774 0.000 502.774 502.774 502.774 600.626 600.626 600.626 478.197 478.197 478.197 680.426 680.426 680.426 To FY 2031 Complete 694.144 694.144 694.144 Total 5,918.325 9,736.825 5,918.325 9,736.825 5,918.325 9,736.825 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: SPY-6(V)4 solid-state radar provides the latest capability to the DDG-51 Class for Air Defense and Ballistic Missile Defense. The SPY-6(V)4 upgrade replaces legacy SPY-1 radar arrays with SPY-6 arrays to deliver AEGIS Baseline 10M with Integrated Air and Missile Defense (IAMD) capability. SPY-6(V)4 upgrades are applicable to DDG 51 Flight IIA ships, DDG 91 through DDG 124 & DDG 127. SPY-6(V)4 fielding plans are integrated with SEWIP BLK III (BLI 2312) in order to rapidly deliver enhanced capability to the DDG-51 Class required to pace new threats by international competitors. SPY-6 Hardware also includes Installation and Checkout (INCO) kits that help with setting up and testing the system. The system includes 24 Radar Modular Assemblies (RMAs) that deliver the radar's detection and tracking capabilities. This line item also includes the necessary cooling equipment such as Electronic Equipment Fluid Coolers (EEFC), specialized Fire Control System coolers (FCS) and the Radar Control Processer (RCP) which manages the SPY-6 radar's operations and integrates with the ship's combat system. The complexity of combat system modernizations with the solid state radar system and supporting equipment requires early advanced planning to ensure necessary design maturity, installation modeling, and ship installation drawing development. This equipment also requires extra long lead time material, such as specific cables and connectors, to be procured in support of planned installations. Production lead time and delivery dates reflect first shipset delivery within a procurement year. Engineering Services: Engineering services include the following efforts: Software Modifications and Land Based Testing prior to shipboard installation, and system integration efforts. In addition, FY26 and prior years also support Non-Recurring Engineering (NRE) requirements for analysis and design efforts associated with first time integration of SPY-6(V)4 with combat systems and distributed services on in-service DDG-51 Class ships. This radar upgrade requires significant redesign of existing distributed service systems such as shipboard power, cooling, and dry-air systems to achieve successful integration. NRE includes Modeling & Simulation, Technical Data Package formulation, First Article Qualification and Environmental Testing. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 69 of 72 P-1 Line #5 Volume 1 - 197 === page 276 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Prior Years Financial Plan Modification Number / Title: 19 / DM014 SOLID STATE RADAR EQUIPMENT Modification Type: SHIP ALT FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: DM014 SOLID STATE RADAR EQUIPMENT B Kits Recurring 1.1.1) DM014 - SOLID STATE RADAR EQUIPMENT NonOrganic 2 / 289.506 (27) Subtotal: Recurring / 289.506 - Subtotal: DM014 SOLID STATE RADAR EQUIPMENT Subtotal: Procurement, All Modification Items 2 / 290.220 / 289.506 - / 290.220 - 2 / 289.506 1 / 7.141 - 2 / 290.220 - / 7.141 - / - / 363.120 - / - 2 / 363.120 - / - / 363.120 - / - - 1 / 7.141 / 290.220 - / 7.141 2 / 363.120 - 2 / 363.120 / 363.120 - 2 / 370.382 / 363.120 - / 370.382 - 2 / 363.120 1 / 188.895 / 370.382 - / 188.895 - 2 / 370.382 2 / 385.346 / 188.895 - / 385.346 - 1 / 188.895 2 / 393.054 / 385.346 - / 393.054 - 2 / 385.346 2 / 393.054 / 393.054 - 12 / 2,980.510 / 2,980.510 - 12 / 2,980.510 / 2,980.510 - 26 / 5,268.174 / 5,268.174 - 26 / 5,268.174 / 5,268.174 - Support (All Modification Items) 2.1) ENGINEERING SERVICES (28) Subtotal: Support - / 61.064 - / 24.480 - / 30.970 - / 33.095 - / - - / 33.095 - / 29.829 - / 29.163 - / 29.748 - / 30.451 - / 340.099 - / 608.899 - / 61.064 - / 24.480 - / 30.970 - / 33.095 - / - - / 33.095 - / 29.829 - / 29.163 - / 29.748 - / 30.451 - / 340.099 - / 608.899 Installation Modification Item 1 of 1: DM014 SOLID STATE RADAR EQUIPMENT - / 3.146 - / 42.923 - / 112.883 - / 106.559 Subtotal: Installation - / 3.146 - / 42.923 - / 112.883 - / 106.559 - / 0.000 - / 106.559 - / 200.415 - / 260.139 - / 265.332 - / 270.639 - / 2,597.716 - / 3,859.752 / - - / 106.559 - / 200.415 - / 260.139 - / 265.332 - / 270.639 - / 2,597.716 - / 3,859.752 - Total Total Cost (Procurement + Support + Installation) LI 0900 - DDG Mod Navy 353.716 357.623 150.994 502.774 0.000 UNCLASSIFIED Page 70 of 72 502.774 600.626 478.197 P-1 Line #5 680.426 694.144 5,918.325 9,736.825 Volume 1 - 198 === page 277 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0900 / DDG Mod Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 19 / DM014 SOLID STATE RADAR EQUIPMENT MDAP/MAIS Code: Modification Item 1 of 1: DM014 SOLID STATE RADAR EQUIPMENT Manufacturer Information Manufacturer Name: RAYTHEON Manufacturer Location: ANDOVER, MA Administrative Leadtime (in Months): 0 Production Leadtime (in Months): 36 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jun 2025 Mar 2026 Jan 2027 Apr 2028 Jun 2029 Jan 2030 Mar 2031 Delivery Dates Sep 2027 Feb 2029 Jan 2030 Apr 2031 Jun 2032 Jan 2033 Mar 2034 Installation Information Method of Implementation: [none specified]:: Installation Name: DM014 - SOLID STATE RADAR EQUIPMENT Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 0 / 3.146 0 / 42.923 1 / 112.883 0 / 38.309 0 / 0.000 0 / 38.309 1 / 60.972 - - / - - / - 0 / 0.000 2 / 258.233 FY 2025 - / - - / - - / - 0 / 68.250 0 / 0.000 0 / 68.250 0 / 69.827 2 / 117.907 - / - - / - 0 / 0.000 2 / 255.984 FY 2026 - / - - / - - / - - / - - / - - / - 0 / 34.808 0 / 35.612 1 / 60.128 - / - 0 / 0.000 1 / 130.548 FY 2027 - / - - / - - / - - / - - / - - / - 0 / 34.808 0 / 71.116 1 / 96.452 1 / 61.331 0 / 0.000 2 / 263.707 FY 2028 - / - - / - - / - - / - - / - - / - - / - 0 / 35.504 0 / 72.538 1 / 98.381 1 / 62.557 2 / 268.980 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 36.214 0 / 37.051 1 / 62.557 1 / 135.822 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 73.876 2 / 203.200 2 / 277.076 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 282.617 2 / 282.617 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 12 / 1,986.785 12 / 1,986.785 Total 0 / 3.146 18 / 2,597.716 26 / 3,859.752 Installation Cost 0 / 42.923 1 / 112.883 0 / 106.559 0 / 0.000 0 / 106.559 1 / 200.415 / - 2 / 260.139 2 / 265.332 2 / 270.639 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - 1 - - - - - - - 1 - 1 - 1 - 1 1 - - - 1 1 18 26 Out - - - - - - - - - - - - - - - - 1 - - - 1 23 26 - - - - - - 1 - Footnotes: (27) Extra-long lead time material (ELLTM) procurement and Design Services Allocation (DSA) for the installation of the solid-state radar and ancillary equipment include prefabrication efforts for various material including adapter plates to support array fit up. DSA and ELLTM are funded 1-2 years in advance of the availability start due to extended procurement lead time of material and to deliver updated Technical Data Packages, conduct ship checks, and meet iterative Ship Installation Drawings (SIDs) development timelines. FY25 procurements deferred from DDG 93 and DDG 97 are planned for installation on DDG 104 and LI 0900 - DDG Mod Navy UNCLASSIFIED Page 71 of 72 P-1 Line #5 Volume 1 - 199 === page 278 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0900 / DDG Mod ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 19 / DM014 SOLID STATE RADAR EQUIPMENT MDAP/MAIS Code: DDG 96 in FY29. All budget requests have been adjusted to account for equipment utilization on future year hulls. FY26 procurement reflects ancillary equipment required for the solid state spy radar system. This equipment is planned for installation with the SPY-6(V)4 radar procured under DMCA-16 - Solid State Radar Equipment Procurement CONGRESSIONAL ADD. FY27 reflects anticipated pricing for follow on SPY-6(V)4 procurements. (28) FY2027 Engineering Services increase for power train testing and system integration of the solid state radar, ancillary equipment and combat system software at land based test sites. LI 0900 - DDG Mod Navy UNCLASSIFIED Page 72 of 72 P-1 Line #5 Volume 1 - 200 === page 279 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0910 / Firefighting Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 227.842 227.842 227.842 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 38.521 36.488 62.331 55.189 - - 38.521 36.488 - - 38.521 36.488 177.708 - 0.000 - 177.708 - 0.000 - 177.708 0.000 177.708 177.708 177.708 165.438 165.438 165.438 - - 62.331 55.189 - - 62.331 55.189 To FY 2031 Complete 56.270 Continuing - Continuing - 56.270 Continuing - Total - Continuing - - 56.270 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The program procures shipboard firefighting equipment. Equipment is procured based on installation schedules. [P40A / HB003 - EMERGENCY ESCAPE BREATHING DEVICE (EEBD)]: Emergency Escape Breathing Device (EEBD) breathing apparatus for firefighters are reaching their service life of 15 years and must be replaced. EEBDs address a high priority CNO effort to replace expired breathing equipment aboard ships throughout the Fleet. The requirement for this capability has been validated by the experience of numerous shipboard casualties. EEBD replacement is required to ensure that ships will deploy with operational safety equipment on-board to allow for emergency escape from shipboard fires. [P40A / HB010 - DAMAGE CONTROL UPGRADES]: Damage Control Upgrades provides rapid assessments and initial outfitting (within a year) for new capabilities or obsolescence. [P40A / L2AB FIREFIGHTING PROGRAMS]: Findings of the Major Fires Review and BONHOMME RICHARD fire investigation recommendations as validated by VCNO in the Learning to Action Board (L2AB). Following the USS Bonhomme Richard fire, the L2AB was stood up to pursue solutions to damage control and firefighting. This program funds critical efforts in shipboard fire detection/suppression systems, fire prevention features, and advanced firefighting equipment. [P40A / HB012 AQUEOUS FILM FORMING FOAM (AFFF) STOCKPILE]: Establish an AFFF stockpile to bridge the gap to a permanent AFFF replacement that does not use Polyfluoroalkyl Substances (PFAS) chemicals. Due to environmental persistence concerns of PFAS (contained in fluorinated surfactants used in AFFF), AFFF is being regulated out of shore-based use and manufacturers are rapidly leaving the AFFF market due to regulations and shrinking demand. [P40A / HB830 - PRODUCTION ENGINEERING (PE)]: PE includes development of technical manuals, Planned Maintenance System (PMS), Provisioning Technical Documentation (PTD), Program Support Data (PSD) and Allowance Parts List (APLs), engineering to manage procurement and material support of design reviews, and program management. [P3A / HB002 - MAGAZINE SPRINKLING IMPROVEMENT]: Replaces the detection system designed in the 1960s which has performance deficiencies and is difficult to support and maintain. Replacement includes the Fire Detection and Actuation System (FDAS) and the Motor-Operated Pilot Valves (MOPV). When the FDAS detects a fire, the MOPV opens to provide the sprinkling for the magazine. The FDAS consists of heat detectors, smoke detectors for amphibious ships, and associated controls. MOPV is the same item procured under HB007 - SOPV Replacement. FDAS/MOPV provides increased fire performance and reduced lifecycle and logistics costs. LI 0910 - Firefighting Equipment Navy UNCLASSIFIED Page 1 of 17 P-1 Line #6 Volume 1 - 201 === page 280 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0910 / Firefighting Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P3A - 2 / HB007 - SOPV REPLACEMENT]: The Solenoid Operated Pilot Valve (SOPV) provides a way for remote control of the Aqueous Film Forming Foam (AFFF) and Countermeasure Wash Down (CMWD) systems. Existing SOPVs are unreliable, costly to repair, and produce the longest downtime for the AFFF system. Top Management Attention/Top Management Initiative (TMA/TMI) and INSURV interest due to impact of this item on AFFF system operation. Replacement of the SOPV with the Motor Operated Pilot Valve (MOPV) is required to ensure these systems are operational for emergencies. MOPV has a 50 year service life and will provide a significant reduction in preventative maintenance and cost. [P3A - 3 / HB008 - SCBA REPLACEMENT]: Self-Contained Breathing Apparatus (SCBA) is a compressed air breathing device compatible with a firefighter's protective wear and helmet, and other damage control equipment. The SCBA are reaching the end of their service life of 15 years and are being replaced with 30 year cylinders. SCBA replacement is required to ensure that ships will deploy with operational safety equipment on-board to provide breathable air while fighting shipboard fires. LI 0910 - Firefighting Equipment Navy UNCLASSIFIED Page 2 of 17 P-1 Line #6 Volume 1 - 202 === page 281 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0910 / Firefighting Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code P-5a Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Firefighting Equipment - / 67.069 - / 8.330 - / 10.409 - / 140.486 P-3a 1 / HB002 - MAGAZINE SPRINKLING IMPROVEMENT (FDAS/MOPV Installation) - / 51.071 - / 22.252 - / 11.895 - / 16.219 P-3a 2 / HB007 - SOPV REPLACEMENT (SOPV REPLACEMENT) - / 29.450 - / 7.507 - / 11.022 - / 21.003 P-3a 3 / HB008 - SCBA REPLACEMENT (SCBA REPLACEMENT) - / 80.252 - / 0.432 - / 3.162 - P-40 Total Gross/Weapon System Cost - / 227.842 - / 38.521 - / 36.488 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code - - / - - / 140.486 - / 0.000 - / 16.219 - / 0.000 - / 21.003 / 0.000 - / 0.000 - / 177.708 - / 0.000 / 0.000 - / 177.708 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Firefighting Equipment P-3a 1 / HB002 - MAGAZINE SPRINKLING IMPROVEMENT (FDAS/MOPV Installation) P-5a - / 20.692 - / 20.705 - / 25.068 - / 20.904 - / 79.550 - / 268.356 P-3a 2 / HB007 - SOPV REPLACEMENT (SOPV REPLACEMENT) - / 23.794 - / 26.505 - / 22.880 - / 17.191 - / 23.929 - / 183.281 P-3a 3 / HB008 - SCBA REPLACEMENT (SCBA REPLACEMENT) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 83.846 P-40 Total Gross/Weapon System Cost / 165.438 - / 62.331 - / 55.189 - / 56.270 Continuing - / - - / - - / - - / - - / - - / - Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 funding increase is due to a cost increase of $130.929 million in HB012 AFFF STOCKPILE ($0 in FY 2026 to $130.929 million in FY 2027), a cost increase of $4.324 million in MAGAZINE SPRINKLING IMPROVEMENT (six installations in FY 2026 to seven installations in FY 2027, cost variability with ship class and ship port location), a cost decrease of $0.002 million in HB003 EEBD REPLACEMENT (three installations in FY 2026 to three installations in FY 2027, cost variability with ship class and ship port location), a cost increase of $9.981 million in HB007 SOPV REPLACEMENT (four installations in FY 2026 to nine installations in FY 2027, cost variability with ship class and ship port location), a cost increase of $0.002 million in HB010 DAMAGE CONTROL UPGRADES, a cost decrease of $0.020 million in HB011 L2AB FIREFIGHTING PROGRAMS, a cost decrease of $0.832 million in HB830 PRODUCTION ENGINEERING, and a cost decrease of $3.162 million in HB008 SCBA REPLACEMENT (two installations in FY 2026 to zero installations in FY 2027). LI 0910 - Firefighting Equipment Navy UNCLASSIFIED Page 3 of 17 P-1 Line #6 Volume 1 - 203 === page 282 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0910 / Firefighting Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) 1) HB003 - EMERGENCY ESCAPE BREATHING DEVICE (EEBD) 1.1) EEBD REPLACEMENT (†) A 297,338.13 Subtotal: 1) HB003 - EMERGENCY ESCAPE BREATHING DEVICE (EEBD) 2) HB010 - DAMAGE CONTROL UPGRADES 2.1) DAMAGE CONTROL UPGRADES FY 2025 Total Cost Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Firefighting Equipment Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) (1) 139 41.330 500,000.00 - - 41.330 - - - 2.836 - - - 4 2.000 1,032K - 2.000 - - - 2.883 2.836 - - - 2.130 - - 2.130 3 3.095 1,031K - 3.095 - - - 2.822 2.883 - - - 0.992 - - - 0.992 3 3.093 - - - 1,031K 3 3.093 - 3.093 - - - - - 3.093 - - 2.824 - - - - - 2.824 2.822 - - 2.824 - - - - - 2.824 - 1.820 - - 1.800 - - - - - 1.800 - - 1.820 - - 1.800 - - - - - 1.800 (2) A Subtotal: 2) HB010 - DAMAGE CONTROL UPGRADES 3) HB011 - L2AB FIREFIGHTING PROGRAMS 3.1) L2AB FIREFIGHTING PROGRAMS A (3) Subtotal: 3) HB011 - L2AB FIREFIGHTING PROGRAMS 4) HB012 AQUEOUS FILM FORMING FOAM (AFFF) STOCKPILE 4.1) AFFF STOCKPILE A (4) - - - - - - - - - - - 130.929 - - - - - 130.929 - - 0.000 - - - - - - - - 130.929 - - - - - 130.929 - - 20.773 - - 2.455 - - 2.672 - - 1.840 - - - - - 1.840 Subtotal: 5) HB830 - PRODUCTION ENGINEERING (PE) - - 20.773 - - 2.455 - - 2.672 - - 1.840 - - - - - 1.840 Total - - 67.069 - - 8.330 - - 10.409 - - 140.486 - - - - - 140.486 Subtotal: 4) HB012 AQUEOUS FILM FORMING FOAM (AFFF) STOCKPILE 5) HB830 - PRODUCTION ENGINEERING (PE) 5.1) PRODUCTION ENGINEERING A (5) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) Quantities are number of ships. Unit costs can vary based on the distribution of ship classes planned during each FY, quantities per ship class, and the ship port location. Requirement is for DDG-51 (Flight I, II, IIA), LCC 0019, LHA 0006, LHD 0001, and LPD 0017 ship classes. PROCUREMENT: Funding includes the breathing apparatus hardware, shipping, and distribution to ships. FY 2027 funding request shows a decrease of $0.002 million due to variation in the ship classes fielded. Procurement costs can vary based on the distribution of ship classes planned during each FY, quantities per ship class, and the ship port location. (2) (3) (4) FY 2027 funding request reflects a cost increase of $0.002 million due to a change in the damage control upgrades requirements. FY 2027 funding request reflects a $0.020 million decrease due to a decrease in the L2AB program requirements. Maintain readiness of fleet to combat liquid fuel fires with fixed systems and portable equipment. Stockpile reduces risk to personnel or ship-loss from uncontrolled fires (flight deck, hangar, bilge etc.). FY 2027 funding request reflects a cost increase of $130.929 million due to stockpiling AFFF to replace depleted AFFF inventory to prevent ships from being unable to get underway in Q2 FY29. LI 0910 - Firefighting Equipment Navy UNCLASSIFIED Page 4 of 17 P-1 Line #6 Volume 1 - 204 === page 283 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 (5) P-1 Line Item Number / Title: 0910 / Firefighting Equipment Aggregated Items Title: Firefighting Equipment FY 2027 funding request shows a decrease of $0.832 million due to method of installation for HB002 and HB007 alterations moving from Alteration Installation Team to Industrial. LI 0910 - Firefighting Equipment Navy UNCLASSIFIED Page 5 of 17 P-1 Line #6 Volume 1 - 205 === page 284 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Item Number / Title [DODIC] O O C FY P-1 Line Item Number / Title: 0910 / Firefighting Equipment Contractor and Location Aggregated Items: Firefighting Equipment Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) HB003 - EMERGENCY ESCAPE BREATHING DEVICE (EEBD) 1.1) EEBD REPLACEMENT 2024 OCENCO / PLEASANT PRAIRIE, WI C / FP NSWC, PCD Sep 2024 Mar 2025 7 422,428.57 Y 1.1) EEBD REPLACEMENT 2025 OCENCO / PLEASANT PRAIRIE, WI C / FP NSWC, PCD Feb 2025 Aug 2025 4 500,000.00 Y 1.1) EEBD REPLACEMENT 2026 OCENCO / PLEASANT PRAIRIE, WI C / FP NSWCPCD Feb 2026 Aug 2026 3 1,032K Y 1.1) EEBD REPLACEMENT 2027 OCENCO / PLEASANT PRAIRIE, WI C / FP NSWC, PCD Feb 2027 Aug 2027 3 1,031K Y LI 0910 - Firefighting Equipment Navy UNCLASSIFIED Page 6 of 17 P-1 Line #6 Volume 1 - 206 === page 285 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0910 / Firefighting Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / HB002 - MAGAZINE SPRINKLING IMPROVEMENT MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 51.071 22.252 11.895 16.219 0.000 16.219 20.692 20.705 25.068 20.904 79.550 - - - - - - - - - - - 51.071 22.252 11.895 16.219 0.000 16.219 20.692 20.705 25.068 20.904 79.550 - - - - - - - - - - - 51.071 22.252 11.895 16.219 0.000 16.219 20.692 20.705 25.068 20.904 79.550 Total 268.356 268.356 268.356 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Replaces the detection system designed in the 1960s which has performance deficiencies and is difficult to support and maintain. Replacement includes the Fire Detection and Actuation System (FDAS) and the Motor-Operated Pilot Valves (MOPV). When the FDAS detects a fire, the MOPV opens to provide the sprinkling for the magazine. The FDAS consists of heat detectors, smoke detectors for amphibious ships, and associated controls. MOPV is the same item procured under HB007 - SOPV Replacement. FDAS/MOPV provides increased fire performance and reduced lifecycle and logistics costs. Procurement costs shown are based on new hardware contract award estimates (HB002/HB007) and actual installation costs from prior years. Installation costs shown are weighted and will vary based on ship class, ship port location, and installation availability. Quantities are number of ships. Requirement is for DDG 0051, LHA 0006, LHD 0001, LPD 0017 ship classes. PROCUREMENT: Procurement costs include FDAS and MOPV equipment, shipping, and distribution to ship. FDAS/MOPV procurement costs can vary significantly by ship class, flight, and quantity and/or size of the magazines. DDG-51 ships already have smoke detectors. PROCUREMENT costs are budgeted in the FY prior to equipment installation. PROCUREMENT costs may be budgeted in the same FY as installation based on installation schedule variation. INSTALLATION: Funding includes all costs associated with the Fleet Modernization Program Magazine Sprinkling Improvement Design Support Allocation (DSA) and equipment installations onboard ships. DSA costs are budgeted in the FY prior to equipment installation starting in FY2021. FDAS/MOPV installation costs can vary significantly by ship class, ship port location, and ship installation availability. DSA costs may be budgeted in the same FY as installation based on installation schedule variation. FY 2027 procurement costs are in support of seven (7) FY 2027 ships and one (1) FY 2028 ship (average $0.554 million) for a program total of $4.432 million. FY 2027 installation costs are in support of seven (7) ship installations ($7.530 million), long lead time material ($0.777 million), installation technical support ($0.950 million), third party planning ($0.030 million) and FY 2028 DSA ($2.500 million) for a program total of $11.787 million. LI 0910 - Firefighting Equipment Navy UNCLASSIFIED Page 7 of 17 P-1 Line #6 Volume 1 - 207 === page 286 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0910 / Firefighting Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / HB002 - MAGAZINE SPRINKLING IMPROVEMENT MDAP/MAIS Code: Models of Systems Affected: N/A Modification Type: FDAS/MOPV Installation Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: HB002 - MAGAZINE SPRINKLING IMPROVEMENT B Kits Recurring 1.1.1) HB002 - MAGAZINE SPRINKLING IMPROVEMENT HW - NonOrganic 26 / 7.926 (6) Subtotal: Recurring - Subtotal: HB002 - MAGAZINE SPRINKLING IMPROVEMENT 5 / 2.500 / 7.926 - 26 / 7.926 Subtotal: Procurement, All Modification Items - / 2.500 6 / 2.296 - 5 / 2.500 / 7.926 - / 2.296 - 6 / 2.296 / 2.500 - / 2.296 - 7 / 4.432 - / - / 4.432 - / - 7 / 4.432 - / - / 4.432 - / - 7 / 4.432 - 10 / 5.271 / 4.432 - 7 / 4.432 - 11 / 3.043 / 5.271 - 10 / 5.271 / 4.432 - 7 / 3.413 / 3.043 - 11 / 3.043 / 5.271 - 7 / 2.195 / 3.413 - 7 / 3.413 / 3.043 - / 2.195 7 / 2.195 / 3.413 - 18 / 12.098 - 97 / 43.174 / 12.098 - 18 / 12.098 / 2.195 - / 12.098 / 43.174 97 / 43.174 - / 43.174 Installation Modification Item 1 of 1: HB002 - MAGAZINE SPRINKLING IMPROVEMENT - / 43.145 - / 19.752 - / 9.599 - / 11.787 Subtotal: Installation - / 43.145 - / 19.752 - / 9.599 - / 11.787 - / 0.000 - / 11.787 - / 15.421 - / 17.662 - / 21.655 - / 18.709 - / 67.452 - / 225.182 / - - / 11.787 - / 15.421 - / 17.662 - / 21.655 - / 18.709 - / 67.452 - / 225.182 - Total Total Cost (Procurement + Support + Installation) LI 0910 - Firefighting Equipment Navy 51.071 22.252 11.895 16.219 0.000 UNCLASSIFIED Page 8 of 17 16.219 20.692 20.705 P-1 Line #6 25.068 20.904 79.550 268.356 Volume 1 - 208 === page 287 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0910 / Firefighting Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / HB002 - MAGAZINE SPRINKLING IMPROVEMENT MDAP/MAIS Code: Modification Item 1 of 1: HB002 - MAGAZINE SPRINKLING IMPROVEMENT Manufacturer Information Manufacturer Name: DLA Manufacturer Location: New MFG - LocN/A (7) Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 6 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Feb 2025 Feb 2026 Feb 2027 Feb 2028 Feb 2029 Feb 2030 Feb 2030 Delivery Dates Oct 2025 Oct 2026 Oct 2027 Oct 2028 Oct 2029 Oct 2030 Oct 2030 Installation Information Method of Implementation: SHIPALT/DSA:: Installation Name: HB002 - MAGAZINE SPRINKLING IMPROVEMENT HW Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 4 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 26 / 43.145 0 / 19.752 5 / 0.000 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 5 / 19.752 Prior Years 22 / 43.145 FY 2025 - / - FY 2026 - / - - / - 0 / 9.599 6 / 0.000 0 / 0.000 6 / 0.000 - / - - / - - / - - / - 0 / 0.000 6 / 9.599 FY 2027 - / - - / - - / - 0 / 11.787 0 / 0.000 0 / 11.787 7 / 0.000 - / - - / - - / - 0 / 0.000 7 / 11.787 FY 2028 - / - - / - - / - - / - - / - - / - - FY 2029 - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 22 / 43.145 4 / 19.752 5 / 9.599 6 / 11.787 0 / 0.000 0 / 15.421 6 / 11.787 10 / 0.000 0 / 17.662 7 / 15.421 10 / 17.662 / - - / - 0 / 0.000 10 / 15.421 11 / 0.000 - / - 0 / 0.000 11 / 17.662 0 / 21.655 7 / 0.000 0 / 0.000 7 / 21.655 0 / 18.709 7 / 0.000 7 / 18.709 / - 18 / 67.452 18 / 67.452 7 / 18.709 25 / 67.452 97 / 225.182 - 11 / 21.655 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 22 4 - - - 5 - - - 6 - - - 7 - - - 10 - - - 11 - - - 7 - - - 25 97 Out 22 2 - - 2 - 2 - 2 25 97 2 2 1 2 2 2 2 1 3 3 3 1 3 3 3 2 - 3 3 1 Footnotes: (6) FY 2027 procurement funding shows an increase of $2.136 million due to an increase in the quantity of procurements from six (6) in FY 2026 to eight (8) in FY 2027 (seven in FY 2027 and one in FY 2028). Procurement costs will vary based on ship class. FY 2027 installation funding request shows an increase of $2.118 million due to an increase in the number of installations from six (6) in FY 2026 to seven (7) in FY 2027. Installation costs will vary based on ship class, ship port location, and installation availability. LI 0910 - Firefighting Equipment Navy UNCLASSIFIED Page 9 of 17 P-1 Line #6 Volume 1 - 209 === page 288 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0910 / Firefighting Equipment ID Code (A=Service Ready, B=Not Service Ready) : (7) Modification Number / Title: 1 / HB002 - MAGAZINE SPRINKLING IMPROVEMENT MDAP/MAIS Code: Hardware procurement through DLA starting in FY 2026. Hardware procurement through Marotta and DLA in FY 2025. LI 0910 - Firefighting Equipment Navy UNCLASSIFIED Page 10 of 17 P-1 Line #6 Volume 1 - 210 === page 289 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0910 / Firefighting Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 2 / HB007 - SOPV REPLACEMENT MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 29.450 7.507 11.022 21.003 0.000 21.003 23.794 26.505 22.880 17.191 23.929 - - - - - - - - - - - 29.450 7.507 11.022 21.003 0.000 21.003 23.794 26.505 22.880 17.191 23.929 - - - - - - - - - - - 29.450 7.507 11.022 21.003 0.000 21.003 23.794 26.505 22.880 17.191 23.929 Total 183.281 183.281 183.281 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Solenoid Operated Pilot Valve (SOPV) provides a way for remote control of the Aqueous Film Forming Foam (AFFF) and Countermeasure Wash Down (CMWD) systems. Existing SOPVs are unreliable, costly to repair, and produce the longest downtime for the AFFF system. Top Management Attention/Top Management Initiative (TMA/TMI) and INSURV interest due to impact of this item on AFFF system operation. Replacement of the SOPV with the Motor Operated Pilot Valve (MOPV) is required to ensure these systems are operational for emergencies. MOPV has a 50 year service life and will provide a significant reduction in preventative maintenance and lifecycle cost. Quantities are number of ships. Requirement is for DDG 0051, LHA 0006, LHD 0001, LPD 0017 ship classes. PROCUREMENT: Costs include MOPV equipment, shipping, and distribution to ship. SOPV procurement costs vary significantly based on ship class and flight. PROCUREMENT costs are budgeted in the FY prior to equipment installation, PROCUREMENT costs may be budgeted in the same FY as installation based on installation schedule variation. INSTALLATION: Funding includes all costs associated with the Fleet Modernization Program SOPV replacement Design Support Allocation (DSA) and equipment installations onboard ships. DSA costs are budgeted in the FY prior to equipment installation. Installation costs are weighted and will vary significantly based on ship class and ship port location. DSA costs may be budgeted in the same FY as installation based on installation schedule variation. FY 2027 procurement costs are in support of nine (9) FY 2027 ships and one (1) FY 2028 ship (average $0.787 million) for a program total of $7.872 million. FY 2027 installation costs are in support of nine (9) ship installations ($8.317 million), long lead time material ($1.104 million), installation technical support ($0.854 million), third party planning ($0.040 million) and FY 2028 DSA ($2.816 million) for a program total of $13.131 million. LI 0910 - Firefighting Equipment Navy UNCLASSIFIED Page 11 of 17 P-1 Line #6 Volume 1 - 211 === page 290 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0910 / Firefighting Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: N/A Modification Type: SOPV REPLACEMENT Prior Years Financial Plan Modification Number / Title: 2 / HB007 - SOPV REPLACEMENT FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: HB007 - SOPV REPLACEMENT B Kits Recurring 1.1.1) HB007 - SOPV REPLACEMENT HW NonOrganic (8) 24 / 12.325 5 / 3.080 4 / 2.005 9 / 7.872 - / - 9 / 7.872 - - - - / - - / - - 1.1.2) SOPV REPLACEMENT FIRST ARTICLES/ TESTING - Organic Subtotal: Recurring Subtotal: HB007 - SOPV REPLACEMENT Subtotal: Procurement, All Modification Items - / 0.567 / 12.892 - 24 / 12.892 / / 3.080 - 5 / 3.080 / / 2.005 - 4 / 2.005 / 7.872 - / - 9 / 7.872 - / - / 7.872 - / - - / 12.892 - / 3.080 - / 2.005 Modification Item 1 of 1: HB007 - SOPV REPLACEMENT - / 16.558 - / 4.427 - / 9.017 - / 13.131 Subtotal: Installation - / 16.558 - / 4.427 - / 9.017 - / 13.131 - - / / 7.872 9 / 7.872 - 12 / 11.188 - 13 / 6.578 / - - / 11.188 - 12 / 11.188 / 7.872 - / 11.188 8 / 13.047 / / 6.578 - - / 6.578 / - - / 13.047 - 13 / 6.578 12 / 3.796 - 8 / 13.047 / - - / 3.796 - 12 / 3.796 / 13.047 - 10 / 2.281 - 97 / 62.172 / - - / 2.281 - 10 / 2.281 / 3.796 - / 0.567 / 62.739 97 / 62.739 / 2.281 - / 62.739 Installation - / 0.000 - / 13.131 - / 12.606 - / 19.927 - / 9.833 - / 13.395 - / 21.648 - / 120.542 / - - / 13.131 - / 12.606 - / 19.927 - / 9.833 - / 13.395 - / 21.648 - / 120.542 - Total Total Cost (Procurement + Support + Installation) LI 0910 - Firefighting Equipment Navy 29.450 7.507 11.022 21.003 0.000 UNCLASSIFIED Page 12 of 17 21.003 23.794 26.505 P-1 Line #6 22.880 17.191 23.929 183.281 Volume 1 - 212 === page 291 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0910 / Firefighting Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / HB007 - SOPV REPLACEMENT MDAP/MAIS Code: Modification Item 1 of 1: HB007 - SOPV REPLACEMENT Manufacturer Information Manufacturer Name: DLA Manufacturer Location: New MFG - LocN/A (9) Administrative Leadtime (in Months): 2 Dates Production Leadtime (in Months): 6 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates FY 2025 Feb 2026 Feb 2027 Feb 2028 Feb 2029 Feb 2030 Feb 2031 Delivery Dates Oct 2026 Oct 2027 Oct 2028 Oct 2029 Oct 2030 Oct 2031 FY 2030 FY 2031 Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 0 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Delivery Dates Installation Information Method of Implementation: SHIPALT/DSA:: Installation Name: HB007 - SOPV REPLACEMENT HW Installation Cost Prior Years Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 19 / 16.558 5 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 24 / 16.558 FY 2025 - / - 0 / 4.427 5 / 0.000 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 5 / 4.427 FY 2026 - / - - / - 0 / 9.017 4 / 0.000 0 / 0.000 4 / 0.000 - / - - / - - / - - / - 0 / 0.000 4 / 9.017 FY 2027 - / - - / - - / - 0 / 13.131 0 / 0.000 0 / 13.131 9 / 0.000 - / - - / - - / - 0 / 0.000 9 / 13.131 FY 2028 - / - - / - - / - - / - - / - - / - - FY 2029 - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete Total LI 0910 - Firefighting Equipment Navy 19 / 16.558 5 / 4.427 5 / 9.017 4 / 13.131 0 / 0.000 UNCLASSIFIED Page 13 of 17 4 / 13.131 0 / 12.606 9 / 12.606 12 / 0.000 / - - / - 0 / 0.000 12 / 12.606 13 / 0.000 - / - 0 / 0.000 13 / 19.927 / - 0 / 9.833 8 / 0.000 0 / 0.000 8 / 9.833 - / - - / - 0 / 13.395 12 / 0.000 12 / 13.395 - / - - / - 0 / 19.927 12 / 19.927 P-1 Line #6 13 / 9.833 / - 10 / 21.648 10 / 21.648 8 / 13.395 - 22 / 21.648 97 / 120.542 Volume 1 - 213 === page 292 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0910 / Firefighting Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / HB007 - SOPV REPLACEMENT MDAP/MAIS Code: Modification Item 1 of 1: HB007 - SOPV REPLACEMENT Installation Information Method of Implementation: SHIPALT/DSA:: Installation Name: HB007 - SOPV REPLACEMENT HW Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 19 5 - - - 5 - - - 4 - - - 9 - - - 12 - - - 13 - - - 8 - - - 22 97 Out 19 2 - 2 - 1 - 3 22 97 2 1 2 1 1 1 1 3 3 3 3 3 3 3 3 3 3 1 3 3 2 Footnotes: (8) Installation quantities reflect number of SHIPALTS to be performed during each FY. DSA quantities are not shown. FY2027 procurement funding request shows an increase of $5.867 million due to an increase in the number of procurements from four (4) in FY 2026 to ten (10) in FY 2027 (nine in FY 2027 and one in FY 2028). FY 2027 installation funding request shows an increase of $4.114 million due to an increase in the number of installations from four (4) in FY 2026 to nine (9) in FY 2027. Installation costs will vary based on ship class, ship port location, and installation availability. (9) MOPV hardware procurement through DLA starting in FY 2026. MOPV hardware procurement through Marotta in FY2025. LI 0910 - Firefighting Equipment Navy UNCLASSIFIED Page 14 of 17 P-1 Line #6 Volume 1 - 214 === page 293 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0910 / Firefighting Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - - 80.252 0.432 3.162 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 83.846 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) To FY 2031 Complete Total - - - - - - - - - - - - 80.252 0.432 3.162 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 83.846 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 3 / HB008 - SCBA REPLACEMENT - - - - - - - - - - - - 80.252 0.432 3.162 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 83.846 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Self-Contained Breathing Apparatus (SCBA) is a compressed air breathing device compatible with a firefighter's protective wear and helmet, and other damage control equipment. The SCBA are reaching the end of their service life of 15 years and are being replaced with 30 year cylinders. SCBA replacement is required to ensure that ships will deploy with operational safety equipment on-board to provide breathable air while fighting shipboard fires. Quantities are number of ships. Requirement: AFDL 0001, AFDM 0001, CG 0047, DDG 0051 (Flight I,II,IIA), LCC 0019, LCU, LHD 0001, LPD 0017, LSD 0041, LSD 0049, MCM 0001, and PC 0001 ship classes. PROCUREMENT: Funding includes the breathing apparatus, 45-minute air cylinders, and 30-minute air cylinders, shipping, distribution to, and modifying stowage on ships. SCBA procurement costs can vary significantly based on ship class. INSTALLATION: Funding includes all costs associated with the Fleet Modernization Program SCBA equipment installations onboard ships. SCBA installation costs can vary significantly based on ship class, ship port location and ship installation availability. SCBA replacement fielding will complete in FY 2026 LI 0910 - Firefighting Equipment Navy UNCLASSIFIED Page 15 of 17 P-1 Line #6 Volume 1 - 215 === page 294 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0910 / Firefighting Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: N/A Modification Type: SCBA REPLACEMENT Prior Years Financial Plan Modification Number / Title: 3 / HB008 - SCBA REPLACEMENT FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: HB008 - SCBA REPLACEMENT B Kits Recurring 1.1.1) HB008 - SCBA REPLACEMENT HW NonOrganic (10) Subtotal: Recurring 170 / 65.792 - / - / 65.792 - / - 170 / 65.792 - / - - / 65.792 - / - Modification Item 1 of 1: HB008 - SCBA REPLACEMENT - / 14.460 - Subtotal: Installation - / 14.460 - Subtotal: HB008 - SCBA REPLACEMENT Subtotal: Procurement, All Modification Items - 2 / 2.685 - / - - / - - / - - / - - / - - / - - / - - / - / 2.685 - / - - / - - / - - / - - / - - / - - / - 2 / 2.685 - / - - / - - / - - / - - / - - / - - / - - / 2.685 - / - - / - - / - - / - - / - - / - - / - - / 0.000 - / 68.477 / 0.432 - / 0.477 / 0.000 - / 0.000 - / 15.369 / 0.432 - / 0.477 / - - / 0.000 - / 15.369 - / 0.000 172 / 68.477 - / - - / 68.477 172 / 68.477 Installation - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 0910 - Firefighting Equipment Navy 80.252 0.432 3.162 0.000 0.000 UNCLASSIFIED Page 16 of 17 0.000 0.000 0.000 P-1 Line #6 0.000 0.000 0.000 83.846 Volume 1 - 216 === page 295 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0910 / Firefighting Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / HB008 - SCBA REPLACEMENT MDAP/MAIS Code: Modification Item 1 of 1: HB008 - SCBA REPLACEMENT Manufacturer Information Manufacturer Name: SCOTT HEALTH & SAFETY Manufacturer Location: MONROE, NC Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 3 FY 2025 FY 2026 FY 2027 Contract Dates Feb 2026 Delivery Dates Aug 2026 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: SHIPALT:: Installation Name: HB008 - SCBA REPLACEMENT HW Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 170 / 14.460 170 / 14.892 Prior Years 0 / 0.432 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2026 - / - - / - 2 / 0.477 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 0.477 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.477 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 170 / 14.460 0 / 0.432 / - - / - 172 / 15.369 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 170 - - - - - - - 2 - - - - - - - - - - - - - - - - - - - - - 172 Out 168 - - - - - - - - - - - - - - - - - - - - - - 172 1 - 1 - 1 - 1 Footnotes: (10) SCBA program completes in FY 2026. FY 2027 procurement and installation funding are not required. LI 0910 - Firefighting Equipment Navy UNCLASSIFIED Page 17 of 17 P-1 Line #6 Volume 1 - 217 === page 296 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 218 === page 297 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0925 / Command and Control Switchboard Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 87.724 2.402 2.417 2.259 0.000 2.259 2.403 2.440 2.489 2.539 - - - - - - - - - - - - 87.724 2.402 2.417 2.259 0.000 2.259 2.403 2.440 2.489 2.539 - - - - - - - - - - - - 87.724 2.402 2.417 2.259 0.000 2.259 2.403 2.440 2.489 2.539 - Total 104.673 104.673 104.673 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The switchboard program provides mission critical switching capability required to link shipboard combat equipment including weapons, launchers, sensors, computers and navigation equipment. In essence, switchboards serve as the central connection point for most elements of combat and weapon systems, interior communications, data transfer, and command and control systems. They are designed to accommodate either analog, digital interfaces, or a combination of both. In total, this budget item supports approximately 200 ships and 1,000 pieces of equipment throughout the acquisition life cycle. Functions include: data routing, action cutout, test and operating mode selection (including casualty back-up modes), power monitoring and control, circuit protection, peripheral equipment isolation, signal processing, and frequency conversion amplification and switching. In summary, the primary purpose is to provide systems intra and interface compatibility. Changes in other elements of the combat and Interior Communication (IC) systems will frequently mandate either conjunctive modification to switchboards via ship change documents (SCDs), ordnance alteration (ORDALT)/field changes (FCs) or partial or complete replacement of existing switchboards. Typical switchboard mods include hardware/field change kits, ORDALT/SCD/FC instructions, technical manual updates and revisions to other supporting documentation. Hull unique switchboard configurations require hull unique documentation. Subsequent alterations to these switchboards require hull unique design, hardware, installation, and checkout procedures. New Switchboards are normally installed during a regular overhaul by a shipyard. Command and control switchboards are currently installed on and are required for almost all surface combatants and amphibious warfare ships. Individual switchboard unit cost varies from ship to ship, depending upon size, complexity, and whether analog or digital interfaces or some combination thereof are utilized. Modifications to existing switchboards via Ship Alterations (SHIPALTs), SCDs, ORDALTs or FCs are quantified by kits or change packages rather than individual units. The number of kits required for different classes of ships are as follows: DDGs/CGs require three to four (3 - 4) per ship, LSDs require two (2) per ship, LPDs require one (1) per ship, MCMs require (3) per ship and LHDs require two (2) per ship. The magnitude of modifications also varies, as Cruiser Modernization is considerably more complex than the Amphibious Class hulls. Switchboard hardware is normally procured by the Invitation For Bids (IFB) process, from manufacturers on Qualified Products List (QPL)-17000. There are currently six companies listed on QPL-17000. All contracts awarded are competitive, fixed price. [P40A / ENG UPGRADES/MODS TO EQUIPMENT & TECH DOCUMENTATION]: Combat Systems & Interior Communication Switchboard Engineering and Modifications Upgrades to Equipment, Drawings, Technical Manuals (TMs) Allowance Parts Lists (APLs) and Allowance Equipage Lists (AELs). This line covers the costs to upgrade/modify existing equipment and associated technical documentation to implement and validate upgraded switching configurations essential for the ships' switchboards to properly integrate all elements of the Combat System and Interior Communication interfaces. The upgraded engineering modification drives the procurement of hardware modification kits (i.e., ORDALTs & Field Changes). These engineering modifications are essential to the functional deployment of Battle Force Interoperability. LI 0925 - Command and Control Switchboard Navy UNCLASSIFIED Page 1 of 5 P-1 Line #7 Volume 1 - 219 === page 298 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0925 / Command and Control Switchboard Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / ORDALT/FIELD CHANGE KITS]: Combat Systems & Interior Communication Switchboard Engineering and Modification Upgrade Procurements. This line covers the costs to implement and validate upgraded Procurement of ORDALT/Field Changes kits driven by upgraded engineering modification. These engineering modifications are essential to the functional deployment of Battle Force Interoperability. LI 0925 - Command and Control Switchboard Navy UNCLASSIFIED Page 2 of 5 P-1 Line #7 Volume 1 - 220 === page 299 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0925 / Command and Control Switchboard Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a COMMAND AND CONTROL SWITCHBOARD P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 87.724 - / 2.402 - / 2.417 - / 2.259 - / 87.724 - / 2.402 - / 2.417 - / 2.259 - / - - / 2.259 / 0.000 - / 2.259 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 funding request supports the procurement of qty 9 ordnance alteration (ORDALT)/field change kits and the associated engineering upgrades, modifications and technical documentation. LI 0925 - Command and Control Switchboard Navy UNCLASSIFIED Page 3 of 5 P-1 Line #7 Volume 1 - 221 === page 300 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0925 / Command and Control Switchboard Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: COMMAND AND CONTROL SWITCHBOARD ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) ENG UPGRADES/MODS TO EQUIPMENT & TECH DOCUMENTATION 1.1) ENGINEERING UPGRADES/MODS TO EQUIPMENT & TECHNICAL DOCUMENTATION A Subtotal: 1) ENG UPGRADES/ MODS TO EQUIPMENT & TECH DOCUMENTATION - - 33.309 - - 1.712 - - 1.718 - - 1.723 - - - - - 1.723 - - 33.309 - - 1.712 - - 1.718 - - 1.723 - - - - - 1.723 278 54.415 13 0.690 12 0.699 0.536 - - - 2) ORDALT/FIELD CHANGE KITS 2.1) ORDALT/FIELD (†) A CHANGE KITS 195,737.41 53,076.92 58,250.00 59,583.33 9 59,583.33 9 0.536 Subtotal: 2) ORDALT/FIELD CHANGE KITS - - 54.415 - - 0.690 - - 0.699 - - 0.536 - - - - - 0.536 Total - - 87.724 - - 2.402 - - 2.417 - - 2.259 - - - - - 2.259 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a LI 0925 - Command and Control Switchboard Navy UNCLASSIFIED Page 4 of 5 P-1 Line #7 Volume 1 - 222 === page 301 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Aggregated Items: COMMAND AND CONTROL SWITCHBOARD FY Contractor and Location Method/Type or Funding Vehicle 2.1) ORDALT/FIELD CHANGE KITS 2024 Valkyrie / Oxnard, CA C / CPFF Port Hueneme, CA Nov 2023 Jan 2024 14 48,357.14 Y 2.1) ORDALT/FIELD CHANGE KITS 2025 Valkyrie / Oxnard, CA C / FFP Port Hueneme, CA Nov 2024 Jan 2025 13 53,076.92 Y 2.1) ORDALT/FIELD CHANGE KITS 2026 Valkyrie / Oxnard, CA C / CPFF Port Hueneme, CA Nov 2025 Jan 2026 12 58,250.00 Y 2.1) ORDALT/FIELD CHANGE KITS 2027 Valkyrie / Oxnard, CA C / CPFF Port Hueneme, CA Nov 2026 Jan 2027 9 59,583.33 Y Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 0925 / Command and Control Switchboard Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 2) ORDALT/FIELD CHANGE KITS LI 0925 - Command and Control Switchboard Navy UNCLASSIFIED Page 5 of 5 P-1 Line #7 Volume 1 - 223 === page 302 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 224 === page 303 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0933 / LHA/LHD Midlife Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 481.620 481.620 481.620 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 76.601 60.617 - - 76.601 60.617 - - 76.601 60.617 131.315 - 0.000 - 131.315 - 0.000 - 131.315 0.000 131.315 131.315 131.315 222.063 222.063 222.063 259.123 259.123 259.123 292.700 292.700 - To FY 2031 Complete 186.012 220.061 186.012 Total - 1,930.112 220.061 - 1,930.112 - 292.700 186.012 220.061 10.141 Continuing 1,930.112 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.342 - 4.066 - 4.066 11.333 12.286 10.926 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - Continuing - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Landing Helicopter Assault (LHA) and Landing Helicopter Dock (LHD) Modernization Program is required to upgrade the in-service LHA 6 and LHD 1 Class ships in order to keep the LHA and LHD Class relevant and operational. The LHA and LHD Program is composed of a series of improvements in both the Hull, Mechanical, and Electrical (HM&E), Interior Communication, Cybersecurity and Aviation Integration systems. Some major modernization efforts include the procurement and installation of Brushless Generators, Electric Plant and Power Management Platform (PMP), Main Feed Pump replacement, and Propulsion and Auxiliary Control System (PACS), Ballast and DC Console, High Efficiency Super Capacity (HES-C) Chiller, and Modular Refrigeration System. The Brushless Generator replacement will reduce down time, total ownership costs, and maintenance costs associated with antiquated brush type generators. Main feed pump procurement and install replaces obsolete main feed pumps for the main propulsion boiler. Propulsion and Auxiliary Control System (PACS) provides a network infrastructure for HM&E systems. [P40A / LHD Class Service Life Extension (SLE)]: Funds LHD-1 WASP Class ships Modernization Program to support service life extension (SLE). SLE outcome maintains LHA/LHD Inventory at 10 ships. [P40A / USS WASP LHD 1 Service Life Extension]: The FY27 increase of $13.242M funds procurement, engineering services, DSA and advance planning in support of the FY29 LHD 1 SRA. Maintains LHD-1 WASP in commission to FY34 vice decommissioning in FY29. LHD 1 age in FY34 is 46 years, LHD-1 Class ESL is 40 years. Maintains LHA/LHD Inventory at 10 ships to mitigate new construction delays. [P40A / LHD SLE PMP2.0 and Circuit Breaker Modernization]: Power Management Platform (PMP) 2.0 is an improvement over baseline 0 and converts legacy analog controls to a digital automated control system in support of LHD 1 Wasp Class Service Life Extension. Installation includes replacement of obsolete switchboard Whipp and Bourne circuit breakers with DRS breakers that will improve navy total ownership by increasing commonality across the fleet and reducing preventative and corrective maintenance. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 1 of 53 P-1 Line #8 Volume 1 - 225 === page 304 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0933 / LHA/LHD Midlife Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a LHA/LHD Midlife - / 63.364 - / 2.266 - / 9.198 - / 14.732 / - - / 14.732 P-3a 1 / Machinery Control System (MCS) (TBD) - / 38.873 - / 5.024 - / 0.488 - / 18.802 - / 0.000 - / 18.802 P-3a 2 / Power Management Platform (Electric Plant Control) (TBD) - / 57.580 - / 1.941 - / 3.867 - / 6.174 - / 0.000 - / 6.174 P-3a 3 / Brushless Generator (TBD) - / 72.606 - / 14.252 - / 0.219 - / 2.578 - / 0.000 - / 2.578 P-3a 4 / Main Feed Pump (TBD) - / 21.434 - / 2.545 - / 0.541 - / 4.189 - / 0.000 - / 4.189 P-3a 6 / Ballast and DC Console (TBD) - / 18.087 - / 0.599 - / 1.002 - / 2.431 - / 0.000 - / 2.431 P-3a 7 / Ship Control System (TBD) - / 38.264 - / 3.468 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-3a 8 / High Efficiency Super Capacity (HES-C) Chiller (TBD) - / 0.000 - / 0.000 - / 39.980 - / 45.694 - / 0.000 - / 45.694 P-3a 5 / Propulsion and Auxiliary Control System (PACS) (TBD) - / 95.069 - / 24.458 - / 1.524 - / 0.000 - / 0.000 - / 0.000 P-3a 9 / Modular Refrigeration System (MRS) (TBD) - / 0.000 - / 0.000 - / 0.000 - / 7.979 - / 0.000 - / 7.979 P-3a 10 / HYDRA (TBD) - / 35.921 - / 7.836 - / 0.941 - / 7.878 - / 0.000 - / 7.878 P-3a 11 / Amplified Announcing System (TBD) - / 18.126 - / 4.223 - / 2.334 - / 4.323 - / 0.000 - / 4.323 P-3a 12 / DCSS (TBD) - / 2.425 - / 0.000 - / 0.000 - / 1.360 - / 0.000 - / 1.360 P-3a 13 / ICT (TBD) - / 7.580 - / 1.643 - / 0.137 - / 2.077 - / 0.000 - / 2.077 P-3a 14 / IVN (TBD) - / 4.962 - / 8.346 - / 0.386 - / 6.935 - / 0.000 - / 6.935 P-3a 15 / IVCN (TBD) - / 7.329 - / 0.000 - / 0.000 - / 6.163 - / 0.000 - P-40 Total Gross/Weapon System Cost / 481.620 - / 76.601 - / 60.617 / 131.315 - / 0.000 - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code - - / 6.163 - / 131.315 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a LHA/LHD Midlife P-3a 1 / Machinery Control System (MCS) (TBD) - / 3.872 - / 8.886 - / 2.252 - / 5.280 - / 2.910 - / 86.387 P-3a 2 / Power Management Platform (Electric Plant Control) (TBD) - / 28.397 - / 16.113 - / 14.048 - / 1.060 - / 0.000 - / 129.180 P-3a 3 / Brushless Generator (TBD) - / 27.759 - / 6.391 - / 14.830 - / 1.000 - / 0.000 - / 139.635 P-3a 4 / Main Feed Pump (TBD) - / 13.963 - / 11.143 - / 10.077 - / 0.000 - / 3.096 - / 66.988 P-3a 6 / Ballast and DC Console (TBD) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 22.119 P-3a 7 / Ship Control System (TBD) - / 0.000 - / 2.519 - / 0.000 - / 5.601 - / 0.000 - / 49.852 P-3a 8 / High Efficiency Super Capacity (HES-C) Chiller (TBD) - / 47.819 / 105.523 - / 93.124 - / 94.503 - / 154.158 - / 580.801 P-3a 5 / Propulsion and Auxiliary Control System (PACS) (TBD) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 25.000 - / 146.051 P-3a 9 / Modular Refrigeration System (MRS) (TBD) - / 8.632 - / 19.102 - / 14.989 - / 4.636 - / 14.893 - / 70.231 P-3a 10 / HYDRA (TBD) - / 4.481 - / 5.932 - / 4.731 - / 0.000 - / 0.000 - / 67.720 P-3a 11 / Amplified Announcing System (TBD) - / 4.385 - / 2.144 - / 2.035 - / 0.000 - / 0.000 - / 37.570 P-3a 12 / DCSS (TBD) - / 1.661 - / 0.616 - / 1.778 - / 0.302 - / 0.353 - / 8.495 LI 0933 - LHA/LHD Midlife Navy - / - - - / - UNCLASSIFIED Page 2 of 53 - / - P-1 Line #8 - / - - / - - / - Volume 1 - 226 === page 305 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0933 / LHA/LHD Midlife Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a 13 / ICT (TBD) - / 0.970 - / 2.499 - / 0.150 - / 1.912 - / 0.974 - / 17.942 P-3a 14 / IVN (TBD) - / 2.227 - / 9.281 - / 0.424 - / 10.150 - / 12.300 - / 55.011 P-3a 15 / IVCN (TBD) - / 6.557 - / 2.043 - / 8.185 - / 0.306 - / 2.817 - P-40 Total Gross/Weapon System Cost - / 222.063 - / 259.123 - / 292.700 - / 186.012 - / 220.061 - / 33.400 / 1,930.112 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2026 spend plan for 0933, LHA/LHD MIDLIFE, includes $60,617 thousand of discretionary funding and $65,400 thousand of mandatory funding for a total of $126,017 thousand. The mandatory funds supported AMPHIB modernization and LHD HM&E integration and availability procurements. The FY27 request for LHA/LHD Midlife includes $131,315 thousand of requirements to support AMPHIB modernization and LHD HM&E integration and availability procurements. FY 2027 funds provided for the modernization of Landing Helicopter Assault (LHA) and Landing Helicopter Dock (LHD) ships to include alteration procurements, installations and Design Services Allocation (DSA), continued Non Reoccurring Engineering (NRE) and engineering services. Discretionary funding increased by $ 70,698 thousand from FY 2026 to FY 2027. Net increase mainly driven by increases in procurement and installation quantities of Machinery Control System (MCS), increases in procurement quantity of Power Management Platform (PMP), increase in A-1 DSA and Advance Planning of Brushless Generator, increases in procurement quantity of Main Feed Pump (MFP), increase in installation quantity of Ballast and Damage Control Console, decrease from net adjustments to High Efficiency Super Capacity (HES-C) Chiller, increase in procurement quantities of Modular Refrigeration System (MRS), increases in procurement quantity of Hierarchical Yet Dynamically Reprogrammable Architecture (HYDRA), increases in procurement and installation quantity of Amplified Announcing System, increases in procurement quantity of Integrated Communication Terminals (ICT), and increases in procurement quantity of Integrated Voice Network (IVN). LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 3 of 53 P-1 Line #8 Volume 1 - 227 === page 306 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: LHA/LHD Midlife FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) LH002 Conjunctive Alterations 1.1) Main Lube Oil A - - - - - - - - - - - 0.220 - - - - - 0.220 - - 54.820 - - 2.266 - - 6.698 - - 0.560 - - - - - 0.560 - - 5.344 - - - - - 1.200 - - 0.710 - - - - - 0.710 - - 60.164 - - 2.266 - - 7.898 - - 1.490 - - - - - 1.490 - - 3.200 - - - - - 1.300 - - - - - - - - - - - 3.200 - - - - - 1.300 - - - - - - - - - - - - - - - - - - 13.242 - - - Subtotal: 3) LHD Class Service Life Extension - - 0.000 - - - - - - - - 13.242 - - - - - 13.242 Total - - 63.364 - - 2.266 - - 9.198 - - 14.732 - - - - - 14.732 Modification (1) 1.2) Conjunctive Alterations (2) 1.3) HM&E CONDITION SYSTEM A A (3) Subtotal: 1) LH002 Conjunctive Alterations 2) JSF ALIS 2.1) JSF ALIS (4) A Subtotal: 2) JSF ALIS 3) LHD Class Service Life Extension 3.2) USS WASP LHD 1 Service Life Extension A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. 13,242K 1 13,242K 1 13.242 Footnotes: (1) The FY2027 increase of $220 thousand request funds non-recurring engineering to mature ship change document, engineering services and advance planning for installation in FY2028. This modification installs new equipment to correct several different design deficiencies in main reduction gear (MRG) lube oil (LO) pressure control system on LHD-8 and LHA class ships. Without alteration ship will be unable to properly manage main reduction gear LO pressure and control it during transients in main engine shaft speed, when shifting LO pumps or changing LO pumps speeds. (2) The FY2027 $0.560M conjunctive request funds LHD 8 FY28 availability scheduled for FY27 award for shipyard prorated and temporary services that support HME conjunctive integration, modifications and testing. Reduction increases risk to funding shipyard services to support installations. Conjunctive Alteration provides modernization modifications and integration to include conjunctive modernization growth Work and prorates of HM&E modifications to accommodate PEO IWS, NAVWAR, NAVAIR and other Program's Modernization during Shipyard Availabilities, equipment procurement, non-recurring and recurring engineering equipment integration and Integrated Logistics Support (ILS) products for LHA and LHD Class ships. (3) The FY 2027 $0.490M decrease due to rephasing of FY27 and FY28 splits for engineering services, procurement and installation on the USS Boxer (LHD 4) by an Alteration Installation Team (AIT). The installation will implement a Defense-in-Depth Functional Implementation Architecture (DFIA) and meet the requirements of the standards released by the Information Assurance Technical Authority Board (IA TAB) across all the HM&E systems deploying the ability to protect, detect, react, and restore in a contested environment. The HM&E Condition System will monitor the signals on the HM&E network, both between HM&E systems and also those coming from other functional domains. (4) FY 2027 decrease of $1.3M due to rephasing of procurement and installation to FY 2028. Funding supports Joint Strike Fighter Autonomic Logistics Information System (JSF ALIS) installations. JSF ALIS is the tactical aircraft logistics system focused on sustainment, together with economies of scale supporting a global supply chain system for aircraft. JSF ALIS is deploying with an Operational Data Integrated Network (ODIN) via On-Board Kit (OBK) rollout. The JSF ALIS ODIN is a form/fit/function install. Installs are to be performed by the In-Service Engineering Agent (ISEA). Installs are not limited to CNO availability schedules and may be performed within windows of opportunity (WOO). LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 4 of 53 P-1 Line #8 Volume 1 - 228 === page 307 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / Machinery Control System (MCS) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 38.873 5.024 0.488 18.802 0.000 18.802 3.872 8.886 2.252 5.280 2.910 86.387 Total - - - - - - - - - - - - 38.873 5.024 0.488 18.802 0.000 18.802 3.872 8.886 2.252 5.280 2.910 86.387 - - - - - - - - - - - - 38.873 5.024 0.488 18.802 0.000 18.802 3.872 8.886 2.252 5.280 2.910 86.387 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Machinery Control System (MCS) will replace the existing obsolete Versa Module Europa (VME) server with Windows XP operating system (O/S) as part of the ship construction award for LHD8 and LHA6. Both the hardware and software are no longer supported by industry and require a complete replacement. MCS will leverage existing infrastructure replacing internal hardware to the existing system's servers. LHD8, LHA 6-7 will receive a Versatile Performance Switching (VPX) server with Windows 10, or future O/S that provides improved bandwidth for control of the ship's 37 vital engineering systems, while maintain margin for new capabilities to be introduced. The new system provides room for growth and flexibility to easily incorporate emerging cyber security requirements that will help prevent adversarial threats. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 5 of 53 P-1 Line #8 Volume 1 - 229 === page 308 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Machinery Control System (MCS) MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: Machinery Control System (MCS) B Kits Non-Recurring 2.2.1) MCS PROCUREMENT - NonOrganic (5) Subtotal: Non-Recurring - / - - / - / 19.324 - / - - / - 2 / 19.324 - / - - / - / 19.324 - / - - / - - Subtotal: Machinery Control System (MCS) Subtotal: Procurement, All Modification Items 2 / 19.324 - 1 / 10.193 - / - / 10.193 - / - 1 / 10.193 - / - / 10.193 - / - - - 1 / 10.193 - / - - / - - / - - / - - / - / 10.193 - / - - / - - / - - / - 1 / 10.193 - / - - / - - / - - / - / 10.193 - / - - / - - / - - / - - / 0.000 / 1.256 - / 1.293 / - - / 1.617 - / 34.717 - - / 0.000 3 / 29.517 - / 29.517 - / - 3 / 29.517 / 29.517 - Support (All Modification Items) 3.1) ENGINEERING SERVICES 3.2) Alteration NRE / - - / 0.372 - / - - / 0.372 - / 1.149 - / 1.183 - / 1.219 - - / 17.180 - / 5.024 - / 0.488 - / 4.067 - / - - / 4.067 - / 2.373 - / 3.273 - / 0.695 - / 19.549 - / 5.024 - / 0.488 - / 4.439 - / - - / 4.439 - / 3.522 - / 4.456 - / 1.914 - / 1.256 - / 2.910 - / 43.558 - / 0.000 - / 0.000 - / 4.170 / 0.000 - / 4.170 - / 0.350 - / 4.430 - / 0.338 - / 4.024 - / 0.000 - / 13.312 / - - / 4.170 / - - / 4.170 - / 0.350 - / 4.430 - / 0.338 - / 4.024 - / 0.000 - / 13.312 (6) (7) Subtotal: Support / 2.369 - / - - - - / 8.841 Installation Modification Item 1 of 1: Machinery Control System (MCS) - / 0.000 Subtotal: Installation - / 0.000 - / - - - Total Total Cost (Procurement + Support + Installation) LI 0933 - LHA/LHD Midlife Navy 38.873 5.024 0.488 18.802 0.000 UNCLASSIFIED Page 6 of 53 18.802 3.872 8.886 P-1 Line #8 2.252 5.280 2.910 86.387 Volume 1 - 230 === page 309 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Machinery Control System (MCS) MDAP/MAIS Code: Modification Item 1 of 1: Machinery Control System (MCS) Manufacturer Information Manufacturer Name: Multiple Manufacturer Location: TBDMulti Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 48 FY 2025 FY 2026 FY 2027 Contract Dates Apr 2027 Delivery Dates Apr 2031 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: MCS PROCUREMENT Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - 1 / 4.170 0 / 0.000 1 / 4.170 0 / 0.350 1 / 3.793 - / - - / - 0 / 0.000 2 / 8.313 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - 0 / 0.637 0 / 0.338 1 / 4.024 0 / 0.000 1 / 4.999 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - 1 / 4.170 Installation Cost 0 / 0.000 1 / 4.170 0 / 0.350 1 / 4.430 0 / 0.338 1 / 4.024 0 / 0.000 3 / 13.312 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - 1 - - - - - - - - - 1 - - - - - - - 1 - - 3 Out - - - - - - - - - - - - - - - - - - - - - - - - - - 1 - - 2 Footnotes: (5) (6) (7) FY2027 request of $10.193M funds procurement quantity increase of Machinery Control System to support LHA 7 in FY31. FY2027 request of $0.372M funds engineering services and sustainment support. FY2027 request of $4.067M (increase of $3.579M) funds Non-Reoccurring Engineering required for the LHA 6 install in FY29. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 7 of 53 P-1 Line #8 Volume 1 - 231 3 === page 310 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 2 / Power Management Platform (Electric Plant Control) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 57.580 1.941 3.867 6.174 0.000 6.174 28.397 16.113 14.048 1.060 0.000 - - - - - - - - - - - 57.580 1.941 3.867 6.174 0.000 6.174 28.397 16.113 14.048 1.060 0.000 - - - - - - - - - - - 57.580 1.941 3.867 6.174 0.000 6.174 28.397 16.113 14.048 1.060 0.000 Total 129.180 129.180 129.180 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Description: Power Management Platform (PMP) modernization converts legacy analog controls to a digital automated control system. This system gathers and combines all Electric plant data that can be monitored at different control stations throughout the engineering plant ensuring redundancy of the system. PMP simplifies multiple control sequences into single step operations, making possible new control capabilities that were too cumbersome for operators to perform. PMP implements a gradual Ship Service Turbine Generator (SSTG) turbine startup/shutdown sequence which allows the turbine to achieve stabilized temperatures more consistently, reducing operational stress on components and improves reliability and operational availability of the system. PMP automation will reduce electrical system transients and stress on breaker components by employing a Zero Power Transfer (ZPT) strategy, which limits the current flow through an individual breaker to zero during open/close evolutions. During PMP installation obsolete switchboard breakers will be replaced with Commercial Off-the-Shelf (COTS) Whipp and Bourne circuit breakers that will improve navy total ownership by increasing commonality across the fleet and reducing preventative and corrective maintenance. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 8 of 53 P-1 Line #8 Volume 1 - 232 === page 311 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 2 / Power Management Platform (Electric Plant Control) FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: Power Management Platform (Electric Plant Control) B Kits Recurring 1.1.1) Power Management Platform (Electric Plant Control) - NonOrganic (8) Subtotal: Recurring - / - 1 / 3.061 / 26.056 - / - 2 / 26.056 - / - / 26.056 - / - - / 3.061 - Subtotal: Power Management Platform (Electric Plant Control) Subtotal: Procurement, All Modification Items 2 / 26.056 - - / 3.061 1 / 3.270 - / - 1 / 3.270 / 3.270 - / - 1 / 3.270 - / - - / 3.270 - / - - / 3.270 - 1 / 3.061 - / 3.270 1 / 12.009 - / - - / - - / - / 12.009 - / - - / - - / - 1 / 12.009 - / - - / - - / - / 12.009 - / - - / - - / - - 1 / 3.270 - - / / 0.000 - 5 / 44.396 - / - / 44.396 5 / 44.396 / 0.000 - / 44.396 Support (All Modification Items) 2.1) PMP Eng Services (9) Subtotal: Support - / 4.116 - / 1.941 - / 0.333 - / 0.339 - / - - / 0.339 - / 2.060 - / 2.101 - / 2.154 - / 1.060 / - - / 14.104 - / 4.116 - / 1.941 - / 0.333 - / 0.339 - / - - / 0.339 - / 2.060 - / 2.101 - / 2.154 - / 1.060 - - / 0.000 - / 14.104 - / 0.000 - / 0.473 - / 2.565 / 0.000 - / 2.565 - / 14.328 - / 14.012 - / 11.894 - / 0.000 - / 0.000 - / 70.680 / - - / 0.473 - / 2.565 / - - / 2.565 - / 14.328 - / 14.012 - / 11.894 / - - / 0.000 - / 70.680 Installation Modification Item 1 of 1: Power Management Platform (Electric Plant Control) - / 27.408 Subtotal: Installation - / 27.408 - - - Total Total Cost (Procurement + Support + Installation) LI 0933 - LHA/LHD Midlife Navy 57.580 1.941 3.867 6.174 0.000 UNCLASSIFIED Page 9 of 53 6.174 28.397 16.113 P-1 Line #8 14.048 1.060 0.000 129.180 Volume 1 - 233 === page 312 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / Power Management Platform (Electric Plant Control) MDAP/MAIS Code: Modification Item 1 of 1: Power Management Platform (Electric Plant Control) Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 22 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Feb 2026 Jun 2027 Aug 2028 Delivery Dates Dec 2028 Apr 2029 Jun 2030 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: Power Management Platform (Electric Plant Control) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 2 / 27.408 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 2 / 27.408 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2026 - / - - / - 0 / 0.473 0 / 2.083 0 / 0.000 0 / 2.083 1 / 11.714 - / - - / - - / - 0 / 0.000 1 / 14.270 FY 2027 - / - - / - - / - 0 / 0.482 0 / 0.000 0 / 0.482 0 / 2.123 1 / 11.923 - / - - / - 0 / 0.000 1 / 14.528 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 0.491 0 / 2.089 1 / 11.894 - / - 0 / 0.000 1 / 14.474 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 27.408 - / - 0 / 0.473 1 / 11.894 - / - 0 / 0.000 Total 0 / 2.565 0 / 0.000 0 / 2.565 1 / 14.328 1 / 14.012 / - - / - 5 / 70.680 Installation Schedule FY 2025 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot 2 - - - - - - - - - - - - 1 - - - - - 1 - - - - 1 - - - - - 5 - - - - - - - - - - - - - - - - - - - - - - - In Out FY 2026 PYS - 1 1 - - - 3 Footnotes: (8) FY 2027 increase of $1.926M funding includes supporting 2-year and 1-year prior DSA and Advance Planning for installations in FY 2028 and FY 2029, and for PMP console procurement only with circuit breakers procured via Reconciliation funding. Unit procurement cost reductions updated for FY26 and FY27 only due to procurement of PMP Circuit Breakers via reconciliation funding. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 10 of 53 P-1 Line #8 Volume 1 - 234 5 === page 313 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / Power Management Platform (Electric Plant Control) MDAP/MAIS Code: (9) Installation funding for a ship is divided over a three-year period. Installation execution funding in the year of availability, and Design Service Allocation (DSA) two years prior to availability, and DSA in the year prior to the availability. This includes ship checks, ship installation drawing (SID) development, logistic document development and long lead time material procurements (LLTM). Installation costs across the FYDP may vary depending on current port rates. Port rates are updated every year by a CNRMC letter based on the forecasted port loading model. Port loading rate forecasts are the rates recommended for all budgeted maintenance and organic modernization within a specific port. Individual ship's availability durations vary dependent upon the integration of ship's maintenance and modernization work packages. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 11 of 53 P-1 Line #8 Volume 1 - 235 === page 314 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 3 / Brushless Generator MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 72.606 14.252 0.219 2.578 0.000 2.578 27.759 6.391 14.830 1.000 0.000 - - - - - - - - - - - 72.606 14.252 0.219 2.578 0.000 2.578 27.759 6.391 14.830 1.000 0.000 - - - - - - - - - - - 72.606 14.252 0.219 2.578 0.000 2.578 27.759 6.391 14.830 1.000 0.000 Total 139.635 139.635 139.635 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Brushless Generator replacement will reduce down time, total ownership costs, and maintenance costs associated with antiquated brush type generators. Brushless Generator Upgrade replaces five (5) brush-type Ship's Service Turbine Generators on LHDs that are plagued by severe reliability, maintenance and obsolescence problems. Brushless Generator Upgrade will reduce both Ship's Force and depot level maintenance requirements and increase the electric plant Operational Availability (Ao) on LHD class ships. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 12 of 53 P-1 Line #8 Volume 1 - 236 === page 315 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / Brushless Generator MDAP/MAIS Code: Models of Systems Affected: LHD Midlife PMP Prior Years Modification Type: TBD FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: Brushless Generator B Kits Recurring 1.1.1) Brushless Generator for PMP - NonOrganic Subtotal: Recurring 4 / 25.975 (10) Subtotal: Brushless Generator Subtotal: Procurement, All Modification Items / 25.975 - 4 / 25.975 / 25.975 - 1 / 6.849 - / - - / - - / - - / - / 6.849 - / - - / - - / - - / - 1 / 6.849 - / - - / - - / - - / - / 6.849 - / - - / - - / - - / - - - - - 1 / 9.019 - / - - / - - / - / 9.019 - / - - / - - / - 1 / 9.019 - / - - / - - / - / 9.019 - / - - / - - / - - / / 0.000 - / / 0.000 - 6 / 41.843 / 41.843 - 6 / 41.843 / 41.843 - Support (All Modification Items) 2.1) Non-Recurring Engineering - / - - / - / - - / - 2 / 13.323 / 1.824 - / 0.503 - / 0.219 - / 0.223 - / - - / 0.223 - / 0.562 - / 3.087 - / 0.241 - / 1.000 - / - - - / 12.021 - / 0.503 - / 0.219 - / 0.223 - / - - / 0.223 - / 2.938 - / 3.837 - / 0.241 - / 1.000 - / 0.000 - / 20.982 Modification Item 1 of 1: Brushless Generator - / 34.610 - / 6.900 - / 0.000 - / 2.355 / 0.000 - / 2.355 - / 15.802 - / 2.554 - / 14.589 - / 0.000 - / 0.000 - / 76.810 Subtotal: Installation - / 34.610 - / 6.900 / - - / 2.355 / - - / 2.355 - / 15.802 - / 2.554 - / 14.589 / - - / 0.000 - / 76.810 2.2) Engineering Services Subtotal: Support / 10.197 - - / - - / - - - / - 1 / 2.376 1 / 0.750 - / - - / 7.659 Installation - - - Total Total Cost (Procurement + Support + Installation) LI 0933 - LHA/LHD Midlife Navy 72.606 14.252 0.219 2.578 0.000 UNCLASSIFIED Page 13 of 53 2.578 27.759 6.391 P-1 Line #8 14.830 1.000 0.000 139.635 Volume 1 - 237 === page 316 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / Brushless Generator MDAP/MAIS Code: Modification Item 1 of 1: Brushless Generator Manufacturer Information Manufacturer Name: KATO ENGINEERING Manufacturer Location: MN Administrative Leadtime (in Months): 0 Production Leadtime (in Months): 30 Dates FY 2025 Contract Dates Jun 2025 Delivery Dates Dec 2027 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: AIT/Industrial:: Installation Name: Brushless Generator for PMP Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 3 / 34.610 - / - - / - - / - - / - 0 / 0.000 4 / 40.890 1 / 15.467 - / - - / - - / - 0 / 0.000 1 / 18.442 Prior Years 1 / 6.280 - / - - FY 2025 - / - 0 / 0.620 - / - 0 / 2.355 0 / 0.000 0 / 2.355 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - 0 / 0.335 0 / 2.554 1 / 14.589 - / - 0 / 0.000 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 6.900 - / - 0 / 2.355 1 / 14.589 - / - 0 / 0.000 Total 3 / 34.610 / - - / - - 0 / 0.000 / - 0 / 2.355 1 / 15.802 0 / 2.554 1 / 17.478 6 / 76.810 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 3 - - - 1 - - - - - - - - 1 - - - - - - - - - 1 - - - - - - 6 Out 2 - - - 1 - - - - - - - - - - - - - - - - - - - - 1 - 1 - 1 Footnotes: (10) The FY 2027 net increase of $2.359M funds one year prior DSA and Advance Planning requirements for installation in FY 2028. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 14 of 53 P-1 Line #8 Volume 1 - 238 6 === page 317 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 4 / Main Feed Pump MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 21.434 2.545 0.541 4.189 0.000 4.189 13.963 11.143 10.077 0.000 3.096 66.988 Total - - - - - - - - - - - - 21.434 2.545 0.541 4.189 0.000 4.189 13.963 11.143 10.077 0.000 3.096 66.988 - - - - - - - - - - - - 21.434 2.545 0.541 4.189 0.000 4.189 13.963 11.143 10.077 0.000 3.096 66.988 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Main Feed Pump (MFP) replacement addresses system obsolescence by installing an industry supported, steam driven pump with a new electronic automatic boiler control that will prevent over-speed conditions, which is a major cause of MFP failures. The new pump will improve reliability, operational availability and bring commonality with other ship classes. Engineering Services required in year prior to install. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 15 of 53 P-1 Line #8 Volume 1 - 239 === page 318 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / Main Feed Pump MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: Main Feed Pump B Kits Recurring 1.1.1) Main Feed Pump - NonOrganic 2 / 4.698 (11) Subtotal: Recurring - Subtotal: Main Feed Pump / 4.698 2 / 4.698 Subtotal: Procurement, All Modification Items 1 / 2.545 - / - / 2.545 - / - 1 / 2.545 - / - / 2.545 - / - - 1 / 2.637 - / - / 2.637 - / - 1 / 2.637 - / - - / 2.637 - / - - / 2.637 - 1 / 2.637 - / 2.637 1 / 2.684 - / - - / - - / - - / 3.096 / 2.684 - / - - / - - / - - / 3.096 1 / 2.684 - / - - / - - / - - / 3.096 - / 2.684 - / - - / - - / - - / 3.096 - 1 / 2.637 5 / 15.660 / 15.660 - 5 / 15.660 - / 4.698 - / 1.982 - / - - / 0.183 - / 0.186 - / - - / 0.186 - / 0.189 - / 0.219 - / - - / - / - - / 2.759 - / 1.982 - / - - / 0.183 - / 0.186 - / - - / 0.186 - / 0.189 - / 0.219 - / - - / - - / 0.000 - / 2.759 / 0.000 - / 0.358 - / 1.366 / 0.000 - / 1.366 - / 11.090 - / 10.924 - / 10.077 / 0.000 - / 0.000 - / 48.569 / - - / 0.358 - / 1.366 / - - / 1.366 - / 11.090 - / 10.924 - / 10.077 / - - / 0.000 - / 48.569 - / 15.660 - Support (All Modification Items) 2.1) Non-Recurring Engineering Subtotal: Support - Installation Modification Item 1 of 1: Main Feed Pump - / 14.754 Subtotal: Installation - / 14.754 - - - Total Total Cost (Procurement + Support + Installation) LI 0933 - LHA/LHD Midlife Navy 21.434 2.545 0.541 4.189 0.000 UNCLASSIFIED Page 16 of 53 4.189 13.963 11.143 P-1 Line #8 10.077 0.000 3.096 66.988 Volume 1 - 240 === page 319 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / Main Feed Pump MDAP/MAIS Code: Modification Item 1 of 1: Main Feed Pump Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 0 Production Leadtime (in Months): 27 Dates FY 2025 Contract Dates Delivery Dates FY 2026 FY 2027 FY 2028 May 2025 Feb 2027 Feb 2028 Aug 2027 May 2029 May 2030 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Industrial:: Installation Name: Main Feed Pump Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - Prior Years - / - - / - - / - - / - - / - 0 / 0.000 2 / 14.754 FY 2025 2 / 14.754 - / - - / - 0 / 0.358 0 / 1.002 0 / 0.000 0 / 1.002 1 / 9.699 - / - - / - - / - 0 / 0.000 1 / 11.059 FY 2026 - / - - / - - / - - - - - - / - - / - - / - - FY 2027 - / - - / - - / - 0 / 0.364 0 / 0.000 0 / 0.364 0 / 1.020 1 / 9.886 - / - - / - 0 / 0.000 1 / 11.270 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 0.371 0 / 1.038 1 / 10.077 - / - 0 / 0.000 1 / 11.486 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 14.754 - / - 0 / 0.358 1 / 10.077 - / - 0 / 0.000 Total / - - / - - / - 0 / 1.366 / - - / - 0 / 0.000 / / - 0 / 1.366 / - 1 / 11.090 1 / 10.924 / - - / - 5 / 48.569 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 2 - - - - - - - - - - - - 1 - - - - - - 1 - - - 1 - - - - - 5 Out 1 - - - - - - - - - - - - - - - - - - 1 - - - - 1 - 1 - - 1 Footnotes: (11) The FY 2027 $3.648M increase funds one year prior DSA and Advance Planning for the FY 2028 installation and initial two-year prior DSA and Advance Planning for the FY 2029 installation. Funding also includes one quantity procurement and NRE for a FY 2029 installation. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 17 of 53 P-1 Line #8 Volume 1 - 241 5 === page 320 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 6 / Ballast and DC Console MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 18.087 0.599 1.002 2.431 0.000 2.431 0.000 0.000 0.000 0.000 0.000 22.119 Total - - - - - - - - - - - - 18.087 0.599 1.002 2.431 0.000 2.431 0.000 0.000 0.000 0.000 0.000 22.119 - - - - - - - - - - - - 18.087 0.599 1.002 2.431 0.000 2.431 0.000 0.000 0.000 0.000 0.000 22.119 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Ballast and Damage Control Console install replaces existing operator consoles for Ballasting, Fire main, Firefighting, and AFFF Systems with Commercial off-the-Shelf, dual screen consoles and Operator Interface Panels. These consoles have been plagued by power supply assemblies and circuit card obsolescence, which has made these systems degraded from their normal capability reducing watchstander situational awareness. This install is a Class safety alt to prevent casualties such as Ballast tank over pressurization and flooding. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 18 of 53 P-1 Line #8 Volume 1 - 242 === page 321 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 6 / Ballast and DC Console FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: Ballast and DC Console B Kits Recurring 2.1.1) BALLAST AND DC CONSOLE PROCUREMENT - NonOrganic (12) Subtotal: Recurring - / - - / - - / - - / - - / - - / - - / - - / - - / - / 14.639 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 14.639 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 14.639 - / - - / - - / - - / - - / - - / - - / - - / - - / - - Subtotal: Ballast and DC Console Subtotal: Procurement, All Modification Items 1 / 14.639 - - / / 0.000 - / 14.639 - / / 0.000 - 1 / 14.639 1 / 14.639 / 14.639 - Support (All Modification Items) 3.1) ENGINEERING SUPPORT - / 3.223 - / 0.599 - / - - / - - / - - / - - / - - / - - / - - / - / - - / 3.822 - / 3.223 - / 0.599 - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 - / 3.822 Modification Item 1 of 1: Ballast and DC Console - / 0.225 - / 0.000 - / 0.000 - / 3.658 Subtotal: Installation - / 0.225 / - - / 0.000 - / 3.658 Subtotal: Support - Installation - / 0.000 - / 1.002 - / 2.431 / - - / 1.002 - / 2.431 - / 0.000 - / 2.431 / - - / 2.431 - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 0933 - LHA/LHD Midlife Navy 18.087 0.599 1.002 2.431 0.000 UNCLASSIFIED Page 19 of 53 2.431 0.000 0.000 P-1 Line #8 0.000 0.000 0.000 22.119 Volume 1 - 243 === page 322 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / Ballast and DC Console MDAP/MAIS Code: Modification Item 1 of 1: Ballast and DC Console Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 24 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: [none specified]:: Installation Name: BALLAST AND DC CONSOLE PROCUREMENT Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 0 / 0.225 - / - 0 / 1.002 1 / 2.431 0 / 0.000 1 / 2.431 - / - - / - - / - - / - 0 / 0.000 1 / 3.658 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 0 / 0.225 - / - 0 / 1.002 1 / 2.431 - / - - / - - / - - / - 0 / 0.000 1 / 2.431 0 / 0.000 1 / 3.658 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - 1 - - - - - - - - - - - - - - - - - - 1 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 - 1 Footnotes: (12) The FY 2027 funding increase (+1.429M) funds installation on LHD 8. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 20 of 53 P-1 Line #8 Volume 1 - 244 === page 323 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 7 / Ship Control System MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 38.264 3.468 0.000 0.000 0.000 0.000 0.000 2.519 0.000 5.601 0.000 49.852 Total - - - - - - - - - - - - 38.264 3.468 0.000 0.000 0.000 0.000 0.000 2.519 0.000 5.601 0.000 49.852 - - - - - - - - - - - - 38.264 3.468 0.000 0.000 0.000 0.000 0.000 2.519 0.000 5.601 0.000 49.852 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: (P40A) SCS-GOV (LHD7/8, LHA 6/7): The Ship Control System-Government (SCS-GOV) supports the standardization of hardware, software and design of the surface ship Ship Control Systems (SCS) to address hardware and software obsolescence issues. The installation will bring commonality across the LHD 1-8 and LHA-6 hulls. SCS-GOV replaces the analog Ship Control System (SCS) with a digital SCS. Analog systems are very maintenance intensive constantly requiring alignment of the amplifiers, indicators, and other transmitting devices. The existing system is also largely obsolete requiring cannibalization from decommissioned ships. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 21 of 53 P-1 Line #8 Volume 1 - 245 === page 324 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 7 / Ship Control System FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: Ship Control System B Kits Recurring 2.1.1) SCS- GOV PROCUREMENT - NonOrganic 6 / 9.292 - / - - / - - / - - / - - / - - / - / 9.292 - / - - / - - / - - / - - / - - / - 6 / 9.292 - / - - / - - / - - / - - / - - / - - / 9.292 - / - - / - - / - - / - - / - - / - - 3.1) ENGINEERING SERVICES - / 2.802 - / - - / - - / - - / - - / - - / - - 3.2) Alteration NRE - / 0.387 - / - - / - - / - - / - - / - - / - - / 3.189 - / - - / - - / - - / - - / - - / - Subtotal: Recurring - Subtotal: Ship Control System Subtotal: Procurement, All Modification Items 1 / 1.485 - / - - / - / 1.485 - / - - / - 1 / 1.485 - / - - / - / 1.485 - / - - / - / 0.647 - / - - / - - / - - / 3.449 / - - / - - / - - / - - / 0.387 - / 0.647 - / - - / - - / 0.000 - / 3.836 / 0.000 - / 0.387 / - - / 0.387 - - / / 0.000 - / / 0.000 - 7 / 10.777 / 10.777 - 7 / 10.777 / 10.777 - Support (All Modification Items) Subtotal: Support - Installation Modification Item 1 of 1: Ship Control System - / 25.783 - / 3.468 Subtotal: Installation - / 25.783 - / 3.468 - / 0.000 - / - - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - - / 0.000 - / 5.601 - / 0.000 - / 35.239 / - - / 5.601 - / 0.000 - / 35.239 Total Total Cost (Procurement + Support + Installation) LI 0933 - LHA/LHD Midlife Navy 38.264 3.468 0.000 0.000 0.000 UNCLASSIFIED Page 22 of 53 0.000 0.000 2.519 P-1 Line #8 0.000 5.601 0.000 49.852 Volume 1 - 246 === page 325 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 7 / Ship Control System MDAP/MAIS Code: Modification Item 1 of 1: Ship Control System Manufacturer Information Manufacturer Name: L3 Manufacturer Location: New York, New York Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 24 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Jun 2029 Delivery Dates Jun 2031 FY 2030 FY 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: SCS- GOV PROCUREMENT Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 5 / 25.783 6 / 29.251 Prior Years 1 / 3.468 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - 0 / 0.387 - / - 1 / 5.601 0 / 0.000 1 / 5.988 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 3.468 - / - - / - - / - - / - - / - 0 / 0.387 - / - 1 / 5.601 Total 5 / 25.783 0 / 0.000 7 / 35.239 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 5 - - - 1 - - - - - - - - - - - - - - - - - - - - - - - 1 - 7 Out 3 - - - 2 - - - - - - - - - - - - - - - - - - - - - - LI 0933 - LHA/LHD Midlife Navy 1 UNCLASSIFIED Page 23 of 53 P-1 Line #8 - 1 Volume 1 - 247 7 === page 326 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 8 / High Efficiency Super Capacity (HESC) Chiller MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 0.000 0.000 39.980 45.694 0.000 45.694 47.819 93.124 94.503 - - - - - - - 0.000 0.000 39.980 45.694 0.000 45.694 47.819 - - - - - - - 0.000 0.000 39.980 45.694 0.000 45.694 47.819 105.523 105.523 105.523 To FY 2031 Complete - - 93.124 94.503 - - 93.124 94.503 Total 154.158 580.801 154.158 580.801 154.158 580.801 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The High Efficiency Super Capacity (HES-C) Chiller increases the cooling capacity onboard LHD class ships to regain cooling margin to support critical loads while reducing mechanical complexity making it lighter, more efficient and improving operational availability. Increased cooling capacity is required for critical combat system operations. Each procurement quantity consists of three HES-C Chillers required for installation in a single space onboard LHDs. Engineering Services support development and delivery of logistics support products, training support, etc. for the HES-C system. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 24 of 53 P-1 Line #8 Volume 1 - 248 === page 327 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 8 / High Efficiency Super Capacity (HESC) Chiller FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: High Efficiency Super Capacity (HES-C) Chiller B Kits Recurring 1.1.1) High Efficiency Super Capacity (HES-C) Chiller - / - - / - / 0.000 - / - / - - / - / 0.000 - / - - / - - / - - / - - / - - / 4.500 - / 0.000 - / - - / 4.500 Modification Item 1 of 1: High Efficiency Super Capacity (HES-C) Chiller - / 0.000 / 0.000 - Subtotal: Installation - / 0.000 NonOrganic - (13) Subtotal: Recurring - Subtotal: High Efficiency Super Capacity (HES-C) Chiller Subtotal: Procurement, All Modification Items - 2 / 35.480 / 35.480 - - / - / 36.225 - / - 2 / 36.225 - / - / 36.225 - / - / 2.400 - / - / - - / - - / 2.400 - / - / 0.000 - / 7.069 / - - / 7.069 - 2 / 35.480 / 35.480 - 2 / 36.225 - 2 / 36.225 / 36.225 - 2 / 36.986 / 36.225 - / 36.986 - 2 / 36.225 2 / 38.096 / 36.986 - / 38.096 - 2 / 36.986 2 / 39.934 / 38.096 - / 39.934 - 2 / 38.096 2 / 40.415 / 39.934 - / 40.415 - 2 / 39.934 - - / 0.000 - 2 / 40.415 - / 40.415 - / 3.056 - / - / / 0.000 12 / 227.136 / 227.136 - 12 / 227.136 / 227.136 - Support (All Modification Items) 2.1) Engineering Services (14) 2.2) NRE Subtotal: Support - / - - - / 2.400 - / 2.527 / - - / 0.263 - / 2.400 - / 2.790 / 0.000 - / 7.069 - / 8.043 - / 65.457 - / 50.223 - / 51.032 - / 145.414 - / 327.238 / - - / 7.069 - / 8.043 - / 65.457 - / 50.223 - / 51.032 - / 145.414 - / 327.238 - - / 1.970 - - - / - / 2.967 - / 1.970 - - / - - / 2.967 - / - / 8.744 - / 3.056 - - / - / 21.664 - / 8.744 - / 4.763 / 26.427 Installation - / - - - Total Total Cost (Procurement + Support + Installation) LI 0933 - LHA/LHD Midlife Navy 0.000 0.000 39.980 45.694 0.000 UNCLASSIFIED Page 25 of 53 45.694 47.819 105.523 P-1 Line #8 93.124 94.503 154.158 580.801 Volume 1 - 249 === page 328 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 8 / High Efficiency Super Capacity (HESC) Chiller MDAP/MAIS Code: Modification Item 1 of 1: High Efficiency Super Capacity (HES-C) Chiller Manufacturer Information Manufacturer Name: Johnson Controls Navy Systems Manufacturer Location: York, PA Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 36 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Dec 2025 Jun 2027 Jan 2028 Delivery Dates Dec 2028 Jun 2030 Jan 2031 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Industrial:: Installation Name: High Efficiency Super Capacity (HES-C) Chiller Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - 0 / 7.069 0 / 0.000 0 / 7.069 0 / 0.463 2 / 57.269 - / - - / - 0 / 0.000 2 / 64.801 FY 2027 - / - - / - - / - - / - - / - - / - 0 / 7.580 0 / 0.472 2 / 41.316 - / - 0 / 0.000 2 / 49.368 FY 2028 - / - - / - - / - - / - - / - - / - - / - 0 / 7.716 0 / 0.480 2 / 42.184 0 / 0.000 2 / 50.380 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 8.427 0 / 0.662 2 / 43.449 2 / 52.538 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 8.186 2 / 45.262 2 / 53.448 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 56.703 2 / 56.703 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - 0 / 7.069 Installation Cost 0 / 0.000 0 / 7.069 0 / 8.043 2 / 65.457 2 / 50.223 - 2 / 51.032 / - - 6 / 145.414 / - 12 / 327.238 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - 1 1 - - - - - 2 - - - 2 6 12 Out - - - - - - - - - - - - - - - - - - - - - - - - - 12 12 - - - - Footnotes: (13) The FY 2027 funding increase of $6.09M funds procurement of 2 ship sets under year 2 pricing awarded to Johnson Controls and Non-reoccurring Engineering (NRE). Funding also includes two year prior requirements for DSA and advance planning for the FY29 installation of quantities procured in FY2026. Installation funding for a ship is divided over a three-year period. Installation execution funding in the year of availability, and Design Service Allocation (DSA) two years prior to availability, and DSA in the year prior to the availability. This includes ship checks, ship installation drawing (SID) development, logistic LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 26 of 53 P-1 Line #8 Volume 1 - 250 === page 329 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 8 / High Efficiency Super Capacity (HESC) Chiller MDAP/MAIS Code: document development and long lead time material procurements (LLTM). Installation costs across the FYDP may vary depending on current port rates. Port rates are updated every year by a CNRMC letter based on the forecasted port loading model. Port loading rate forecasts are the rates recommended for all budgeted maintenance and organic modernization within a specific port. Individual ship's availability durations vary dependent upon the integration of ship's maintenance and modernization work packages. (14) The FY 2027 $2.4M increase funds engineering services by the In-service Engineering Agent for sustainment support of existing chillers and supportability of replacement HESC. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 27 of 53 P-1 Line #8 Volume 1 - 251 === page 330 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 5 / Propulsion and Auxiliary Control System (PACS) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 95.069 24.458 1.524 0.000 0.000 0.000 0.000 0.000 0.000 0.000 25.000 - - - - - - - - - - - 95.069 24.458 1.524 0.000 0.000 0.000 0.000 0.000 0.000 0.000 25.000 - - - - - - - - - - - 95.069 24.458 1.524 0.000 0.000 0.000 0.000 0.000 0.000 0.000 25.000 Total 146.051 146.051 146.051 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Propulsion and Auxiliary Control System (PACS) provides a network infrastructure for Hull, Mechanical & Electrical Systems to operate on that provides the operator necessary situational awareness of the engineering plant. It will improve functionality for Fluid Control Systems (FCS), Fire Protection Systems and Interior Communication/ System Monitoring (IC/SM) alarm switchboard, which are severely degraded or inoperable across the LHD Class due to obsolescence. PACS must be installed prior to or conjunctively with Damage Control/ Ballast Control Console Upgrade, which is a Class Safety Alteration. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 28 of 53 P-1 Line #8 Volume 1 - 252 === page 331 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 5 / Propulsion and Auxiliary Control System (PACS) FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: Propulsion and Auxiliary Control System (PACS) B Kits Recurring 1.1.1) Propulsion and Auxiliary Control System (PACS) procurement - NonOrganic Subtotal: Recurring 4 / 37.146 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 37.146 - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 37.146 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 37.146 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 12.769 - / 2.797 - / 1.524 - / - - / - - / - - / - - / - - / - - / - - / 12.769 - / 2.797 - / 1.524 - / - - / - - / - - / - - / - - / - - / - Modification Item 1 of 1: Propulsion and Auxiliary Control System (PACS) - / 45.154 - / 21.661 - / 0.000 Subtotal: Installation - / 45.154 - / 21.661 - Subtotal: Propulsion and Auxiliary Control System (PACS) Subtotal: Procurement, All Modification Items - / / 0.000 - 4 / 37.146 - / - / 37.146 4 / 37.146 / 0.000 - / 37.146 / - - / 17.090 / 0.000 - / 17.090 Support (All Modification Items) 2.1) Propulsion and Auxiliary Control System (PACS) Eng Services Subtotal: Support - Installation - / - - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / 25.000 - / 91.815 / - - / 25.000 - / 91.815 Total Total Cost (Procurement + Support + Installation) LI 0933 - LHA/LHD Midlife Navy 95.069 24.458 1.524 0.000 0.000 UNCLASSIFIED Page 29 of 53 0.000 0.000 0.000 P-1 Line #8 0.000 0.000 25.000 146.051 Volume 1 - 253 === page 332 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / Propulsion and Auxiliary Control System (PACS) MDAP/MAIS Code: Modification Item 1 of 1: Propulsion and Auxiliary Control System (PACS) Manufacturer Information Manufacturer Name: VARIOUS Manufacturer Location: TBD Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 24 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Industrial:: Installation Name: Propulsion and Auxiliary Control System (PACS) procurement Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 2 / 45.154 1 / 21.661 1 / 25.000 4 / 91.815 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 21.661 - / - - / - - / - - / - - / - - / - - / - - / - Total 2 / 45.154 1 / 25.000 4 / 91.815 Installation Schedule FY 2025 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot 2 - - - 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 4 - - - 1 - - - - - - - - - - - - - - - - - - - - - - - 1 4 In Out FY 2026 PYS - LI 0933 - LHA/LHD Midlife Navy 2 UNCLASSIFIED Page 30 of 53 P-1 Line #8 Volume 1 - 254 === page 333 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 9 / Modular Refrigeration System (MRS) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 0.000 0.000 0.000 7.979 0.000 7.979 8.632 19.102 14.989 4.636 14.893 70.231 Total - - - - - - - - - - - - 0.000 0.000 0.000 7.979 0.000 7.979 8.632 19.102 14.989 4.636 14.893 70.231 - - - - - - - - - - - - 0.000 0.000 0.000 7.979 0.000 7.979 8.632 19.102 14.989 4.636 14.893 70.231 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Modular Refrigeration System (MRS) modernizes the reefer systems onboard LHD and LHA class ships. This upgrade removes obsolete refrigerant from use as well as lowers total ownership costs, maintenance costs, and increases reefer unit availability. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 31 of 53 P-1 Line #8 Volume 1 - 255 === page 334 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 9 / Modular Refrigeration System (MRS) MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: Modular Refrigeration System (MRS) A Kits Recurring 1.1.1) Modular Refrigeration System - NonOrganic - (15) Subtotal: Recurring - Subtotal: Modular Refrigeration System (MRS) Subtotal: Procurement, All Modification Items - / - - / - - / - / 0.000 - / - - / - / - - / - - / - / 0.000 - / - - / - 2 / 7.248 - / - / 7.248 - / - 2 / 7.248 - / - / 7.248 - / - - - 2 / 7.248 / 7.248 - 2 / 7.378 / 7.248 - / 7.378 - 2 / 7.248 - / - / 7.378 1 / 3.984 - / 3.755 - / - - / - / 3.755 - / - - / 3.984 - / 0.000 - - / 3.984 / - 1 / 3.755 - 2 / 7.378 - 1 / 3.755 / 0.000 - 1 / 3.984 - 6 / 22.365 / 22.365 - / - 6 / 22.365 / 22.365 - Support (All Modification Items) 2.1) Engineering Services / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.250 - / 0.258 - / 0.508 - / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / 0.250 - / 0.258 - / 0.508 Modification Item 1 of 1: Modular Refrigeration System (MRS) - / 0.000 Subtotal: Installation - / 0.000 Subtotal: Support - Installation - / 0.000 - / - - / 0.000 - / 0.731 / - - / 0.731 - / 0.000 - / 0.731 - / 1.254 - / 15.347 - / 14.989 - / 0.402 - / 14.635 - / 47.358 / - - / 0.731 - / 1.254 - / 15.347 - / 14.989 - / 0.402 - / 14.635 - / 47.358 - Total Total Cost (Procurement + Support + Installation) LI 0933 - LHA/LHD Midlife Navy 0.000 0.000 0.000 7.979 0.000 UNCLASSIFIED Page 32 of 53 7.979 8.632 19.102 P-1 Line #8 14.989 4.636 14.893 70.231 Volume 1 - 256 === page 335 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 9 / Modular Refrigeration System (MRS) MDAP/MAIS Code: Modification Item 1 of 1: Modular Refrigeration System (MRS) Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 24 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Dec 2026 Jun 2028 Jan 2029 Delivery Dates Dec 2028 Jun 2030 Jan 2031 FY 2030 FY 2031 Installation Information Method of Implementation: Industrial:: Installation Name: Modular Refrigeration System Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - 0 / 0.731 0 / 0.000 0 / 0.731 0 / 0.509 2 / 14.450 - / - - / - 0 / 0.000 2 / 15.690 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 0.745 0 / 0.518 2 / 14.734 - / - 0 / 0.000 2 / 15.997 FY 2029 - / - - / - - / - - / - - / - - / - - / - 0 / 0.379 0 / 0.255 - / - 1 / 6.970 1 / 7.604 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.402 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - 0 / 0.731 Installation Cost 0 / 0.000 0 / 0.731 0 / 1.254 2 / 15.347 - 2 / 14.989 / - - 1 / 7.665 / - - 0 / 0.402 / - 1 / 8.067 / - - 2 / 14.635 / - 6 / 47.358 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - 1 1 - - - - - 2 - - - - 2 6 Out - - - - - - - - - - - - - - - - - - - - - 1 - - - - 4 6 - - 1 Footnotes: (15) The FY 2027 funding increase of $7.979M funds the first year of procurements. It funds the procurement of 2 ship sets for FY 2029 installation. Funding also includes two year prior requirements ($0.731M) for DSA and Advanced Planning. Installation funding for a ship is divided over a three-year period. Installation execution funding in the year of availability, and Design Service Allocation (DSA) two years prior to availability, and DSA in the year prior to the availability. This includes ship checks, ship installation drawing (SID) development, logistic document development and long lead time material procurements (LLTM). Installation costs across the FYDP may vary depending on current port rates. Port rates are updated every year by a CNRMC letter based on the forecasted port loading model. Port loading rate forecasts are LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 33 of 53 P-1 Line #8 Volume 1 - 257 === page 336 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 9 / Modular Refrigeration System (MRS) MDAP/MAIS Code: the rates recommended for all budgeted maintenance and organic modernization within a specific port. Individual ship's availability durations vary dependent upon the integration of ship's maintenance and modernization work packages. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 34 of 53 P-1 Line #8 Volume 1 - 258 === page 337 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 10 / HYDRA MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 35.921 7.836 0.941 7.878 0.000 7.878 4.481 5.932 4.731 0.000 0.000 67.720 Total - - - - - - - - - - - - 35.921 7.836 0.941 7.878 0.000 7.878 4.481 5.932 4.731 0.000 0.000 67.720 - - - - - - - - - - - - 35.921 7.836 0.941 7.878 0.000 7.878 4.481 5.932 4.731 0.000 0.000 67.720 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Hierarchical Yet Dynamically Reprogrammable Architecture (HYDRA) modernization replaces the unsupported P7100/MRK fixed and portable radios with new XG-75 radios and Radiating Transmission Lines (RTL) that incorporates industry standard Association of Public Safety Communications Official (APCO) P-25 signaling protocols. The new system will maintain vital, below deck, wireless communications that enable ship's force to coordinate amphibious, aviation, force protection and damage control operations safely. HYDRA modernization will establish commonality across CG, CVN, LPD and LSD Ship Classes. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 35 of 53 P-1 Line #8 Volume 1 - 259 === page 338 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 10 / HYDRA FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: HYDRA B Kits Recurring 1.1.1) HYDRA - NonOrganic 5 / 22.835 (16) Subtotal: Recurring - Subtotal: HYDRA Subtotal: Procurement, All Modification Items / 22.835 - 5 / 22.835 1 / 3.132 - / - / 3.132 - / - 1 / 3.132 - / - - / - 1 / 3.216 - / - / 3.216 - / - 1 / 3.216 - / - - / 3.216 - / - - / 3.216 / 0.000 - / - - - - / 22.835 - / 3.132 Modification Item 1 of 1: HYDRA - / 13.086 - / 4.704 - / 0.941 - / 4.662 Subtotal: Installation - / 13.086 - / 4.704 - / 0.941 - / 4.662 1 / 3.216 - 1 / 3.274 - / - - / - - / - / 3.274 - / - - / - - / - 1 / 3.274 - / - - / - - / - - / 3.274 - / - - / - - / - - / 0.000 - / 32.457 / 4.662 - / 1.207 - / 5.932 - / 4.731 / 0.000 - / 0.000 - / 35.263 / 4.662 - / 1.207 - / 5.932 - / 4.731 / - - / 0.000 - / 35.263 / 3.216 - 1 / 3.216 - / / 0.000 - 8 / 32.457 - / - / 32.457 8 / 32.457 Installation - - Total Total Cost (Procurement + Support + Installation) LI 0933 - LHA/LHD Midlife Navy 35.921 7.836 0.941 7.878 0.000 UNCLASSIFIED Page 36 of 53 7.878 4.481 5.932 P-1 Line #8 4.731 0.000 0.000 67.720 Volume 1 - 260 === page 339 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 10 / HYDRA MDAP/MAIS Code: Modification Item 1 of 1: HYDRA Manufacturer Information Manufacturer Name: Harris Corporation Manufacturer Location: Lynchburg, VA Administrative Leadtime (in Months): 0 Production Leadtime (in Months): 20 Dates FY 2025 Contract Dates Delivery Dates FY 2026 FY 2027 FY 2028 Jun 2025 Jun 2027 May 2028 Feb 2027 Feb 2029 Jan 2030 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: HYDRA Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 3 / 13.086 - Prior Years 1 / 4.532 - / - - / - - / - - / - - / - 1 / 0.000 5 / 17.618 FY 2025 - / - 0 / 0.172 0 / 0.941 1 / 4.484 0 / 0.000 1 / 4.484 - / - - / - - / - - / - 0 / 0.000 1 / 5.597 FY 2026 - / - - / - - / - - - - - / - - / - - / - - / - - FY 2027 - / - - / - - / - 0 / 0.178 0 / 0.000 0 / 0.178 0 / 1.026 1 / 4.937 - / - - / - 0 / 0.000 1 / 6.141 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 0.181 0 / 0.995 1 / 4.731 - / - 0 / 0.000 1 / 5.907 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 4.731 - / - 1 / 0.000 Total 3 / 13.086 1 / 4.704 / - - 0 / 0.941 / - - / - 1 / 4.662 / / - 0 / 0.000 / - 1 / 4.662 0 / 1.207 1 / 5.932 / - - / - 8 / 35.263 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 3 - - 1 - - - - - 1 - - - - - - - - - 1 - 1 - - - - - - - 1 8 Out 2 - - - - - - - - - - - - - - - - - - 1 8 - 1 - 1 - 1 - - 1 1 Footnotes: (16) The FY 2027 funding increase $6.937M funds one procurement for FY2029 installation. FY2027 funding also include one installation funding on LHD 8 and two year prior for DSA for the FY2029 installation. Installation funding for a ship is divided over a three-year period. Installation execution funding in the year of availability, and Design Service Allocation (DSA) two years prior to availability, and DSA in the year prior to the availability. This includes ship checks, ship installation drawing (SID) development, logistic document development and long lead time material procurements (LLTM). Installation costs across the LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 37 of 53 P-1 Line #8 Volume 1 - 261 === page 340 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 10 / HYDRA MDAP/MAIS Code: FYDP may vary depending on current port rates. Port rates are updated every year by a CNRMC letter based on the forecasted port loading model. Port loading rate forecasts are the rates recommended for all budgeted maintenance and organic modernization within a specific port. Individual ship's availability durations vary dependent upon the integration of ship's maintenance and modernization work packages. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 38 of 53 P-1 Line #8 Volume 1 - 262 === page 341 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 11 / Amplified Announcing System MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 18.126 4.223 2.334 4.323 0.000 4.323 4.385 2.144 2.035 0.000 0.000 37.570 Total - - - - - - - - - - - - 18.126 4.223 2.334 4.323 0.000 4.323 4.385 2.144 2.035 0.000 0.000 37.570 - - - - - - - - - - - - 18.126 4.223 2.334 4.323 0.000 4.323 4.385 2.144 2.035 0.000 0.000 37.570 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: General Announcing upgrade replaces the obsolete 1/2/3/5/6/10MC Announcing Systems with a common, survival Digital Integrated Announcing System (DIAS), which has been installed on the DDG and CG Classes during midlife modernization. Existing announcing systems are riddled with obsolescence that degrades performance and presents a safety concern, during shipboard operations and casualties. This is a capability required in the LHD Required Operational Capabilities (ROC) document. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 39 of 53 P-1 Line #8 Volume 1 - 263 === page 342 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 11 / Amplified Announcing System MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: Amplified Announcing System B Kits Non-Recurring 2.2.1) AMPLIFIED ANNOUNCING SYSTEM PROCUREMENTS - NonOrganic 5 / 13.432 (17) Subtotal: Non-Recurring Subtotal: Amplified Announcing System Subtotal: Procurement, All Modification Items / 13.432 - 1 / 2.121 - 5 / 13.432 - / 2.121 1 / 2.159 - 1 / 2.121 / 2.159 - 1 / 2.159 1 / 2.213 - / - 1 / 2.213 / 2.213 - / - 1 / 2.213 - / - - / - - / 2.213 / 0.000 - / - - / 13.432 - / 2.121 - / 2.159 - / 2.213 - / 2.213 1 / 2.237 - / - - / - - / - - / - / 2.237 - / - - / - - / - 1 / 2.237 - / - - / - - / - - / 2.237 - / - - / - - / - - / 0.000 - / 22.162 / 2.110 - / 2.148 - / 2.144 - / 2.035 / 0.000 - / 0.000 - / 15.408 / 2.110 - / 2.148 - / 2.144 - / 2.035 / - - / 0.000 - / 15.408 - 1 / 2.213 / 0.000 9 / 22.162 - - / - / 22.162 9 / 22.162 Installation Modification Item 1 of 1: Amplified Announcing System - / 4.694 - / 2.102 - / 0.175 - / 2.110 Subtotal: Installation - / 4.694 - / 2.102 - / 0.175 - / 2.110 - - Total Total Cost (Procurement + Support + Installation) LI 0933 - LHA/LHD Midlife Navy 18.126 4.223 2.334 4.323 0.000 UNCLASSIFIED Page 40 of 53 4.323 4.385 2.144 P-1 Line #8 2.035 0.000 0.000 37.570 Volume 1 - 264 === page 343 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 11 / Amplified Announcing System MDAP/MAIS Code: Modification Item 1 of 1: Amplified Announcing System Manufacturer Information Manufacturer Name: Dynalec Corporation Manufacturer Location: Sodus, NY Administrative Leadtime (in Months): 0 Production Leadtime (in Months): 20 Dates FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Jun 2025 May 2026 Jun 2027 May 2028 Delivery Dates Feb 2027 Jan 2028 Feb 2029 Jan 2030 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: AMPLIFIED ANNOUNCING SYSTEM PROCUREMENTS Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 2 / 4.694 1 / 2.064 - - / - - / - - / - - / - - / - 2 / 0.000 5 / 6.758 FY 2025 - / - 0 / 0.038 0 / 0.137 1 / 1.932 0 / 0.000 1 / 1.932 - / - - / - - / - - / - 0 / 0.000 1 / 2.107 FY 2026 - / - - / - 0 / 0.038 0 / 0.139 0 / 0.000 0 / 0.139 1 / 1.966 - / - - / - - / - 0 / 0.000 1 / 2.143 FY 2027 - / - - / - - / - 0 / 0.039 0 / 0.000 0 / 0.039 0 / 0.142 1 / 2.000 - / - - / - 0 / 0.000 1 / 2.181 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 0.040 0 / 0.144 1 / 2.035 - / - 0 / 0.000 1 / 2.219 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 2 / 4.694 1 / 2.035 - / - 2 / 0.000 Installation Cost 1 / 2.102 / - - 0 / 0.175 / - - 1 / 2.110 / - 0 / 0.000 1 / 2.110 1 / 2.148 1 / 2.144 9 / 15.408 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 2 - - 1 - - - - - 1 - - - 1 - - - - - 1 - 1 - - - - - - - 2 9 Out 2 - - - - - - - - - - - - - - 1 - - - - 2 9 - - 1 - 1 - - 1 1 Footnotes: (17) The FY 2027 increase is due to an installation for LHD 8 and procurement in FY 2027 for FY 2029 installation. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 41 of 53 P-1 Line #8 Volume 1 - 265 === page 344 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 12 / DCSS MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 2.425 0.000 0.000 1.360 0.000 1.360 1.661 0.616 1.778 0.302 0.353 8.495 Total - - - - - - - - - - - - 2.425 0.000 0.000 1.360 0.000 1.360 1.661 0.616 1.778 0.302 0.353 8.495 - - - - - - - - - - - - 2.425 0.000 0.000 1.360 0.000 1.360 1.661 0.616 1.778 0.302 0.353 8.495 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Digital Defense Communications Subsystem (DCSS) Upgrade: Replaces four full size, 23", obsolete cabinets on LHD 5-7 and two full size, 23", legacy cabinets on LHD 8 and LHA 6 with two 2U,19" rack mountable IP conference servers. Exterior net terminals and interior non-operational or materially deficient net terminals will be replaced. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 42 of 53 P-1 Line #8 Volume 1 - 266 === page 345 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 12 / DCSS FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: DCSS B Kits Non-Recurring 2.2.1) DIGITAL DCSS UPDRADE PROCUREMENT NonOrganic (18) Subtotal: Non-Recurring 1 / 1.025 - / - - / - / 1.025 - / - - / - 1 / 1.025 - / - - / - - / 1.025 - / - - / - Modification Item 1 of 1: DCSS - / 1.400 Subtotal: Installation - / 1.400 - Subtotal: DCSS Subtotal: Procurement, All Modification Items 1 / 1.283 - / - 1 / 1.283 / 1.283 - / - 1 / 1.283 - / - - / 1.283 - / - - / 1.283 / 0.000 - / 0.077 / 0.000 - / - - / 0.077 / - - - - / 1.283 1 / 1.299 - / - / 1.299 - / - 1 / 1.299 - / - - / 1.299 - / - / 0.077 - / 0.362 - / 0.077 - / 0.362 - - 1 / 1.283 1 / 1.363 - / - - / - / 1.363 - / - 1 / 1.363 - / - - / 1.363 - / - - / 0.000 - / 4.970 / 0.616 - / 0.415 - / 0.302 - / 0.353 - / 3.525 / 0.616 - / 0.415 - / 0.302 - / 0.353 - / 3.525 - / 0.000 4 / 4.970 - - / - / 4.970 4 / 4.970 Installation - / 0.000 - / - - - Total Total Cost (Procurement + Support + Installation) LI 0933 - LHA/LHD Midlife Navy 2.425 0.000 0.000 1.360 0.000 UNCLASSIFIED Page 43 of 53 1.360 1.661 0.616 P-1 Line #8 1.778 0.302 0.353 8.495 Volume 1 - 267 === page 346 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 12 / DCSS MDAP/MAIS Code: Modification Item 1 of 1: DCSS Manufacturer Information Manufacturer Name: AVAYA Federal Solutions, INC. Manufacturer Location: Fairfax, VA Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 22 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Apr 2027 Jan 2028 Delivery Dates Feb 2029 Nov 2029 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: DIGITAL DCSS UPDRADE PROCUREMENT Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 1 / 1.400 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 1.400 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - 0 / 0.077 0 / 0.000 0 / 0.077 0 / 0.283 1 / 0.328 - / - - / - 0 / 0.000 1 / 0.688 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 0.079 0 / 0.288 1 / 0.333 - / - 0 / 0.000 1 / 0.700 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - - / - - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.082 0 / 0.302 1 / 0.353 1 / 0.737 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 1 / 1.400 - / - - / - 0 / 0.077 0 / 0.000 0 / 0.077 0 / 0.362 1 / 0.616 / - 1 / 0.415 0 / 0.302 / - - 1 / 0.353 / - 4 / 3.525 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 1 - - - - - - - - - - - - - - - - - - 1 - 1 - - - - - - - 1 4 Out 1 - - - - - - - - - - - - - - - - - - - - - - - - - 3 4 - - - Footnotes: (18) The FY 2027 increase is due to one procurement and two years prior DSA in FY 2027 for the FY 2029 installation. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 44 of 53 P-1 Line #8 Volume 1 - 268 === page 347 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 13 / ICT MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 7.580 1.643 0.137 2.077 0.000 2.077 0.970 2.499 0.150 1.912 0.974 17.942 Total - - - - - - - - - - - - 7.580 1.643 0.137 2.077 0.000 2.077 0.970 2.499 0.150 1.912 0.974 17.942 - - - - - - - - - - - - 7.580 1.643 0.137 2.077 0.000 2.077 0.970 2.499 0.150 1.912 0.974 17.942 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Integrated Communication Terminals (ICT) upgrade replaces the antiquated system with a Commercial off-the-Shelf digital system that improves both internal and external communications with the ship necessary to meeting USMC requirements for executing operations. The system incorporates hardware installed on the LCS, CVN-78 and CVN-68 classes, reducing supportability and training requirements for the fleet. This upgrade is necessary for Digital Conference Switch System (DCSS) and Integrated Voice Network System upgrades to be implemented. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 45 of 53 P-1 Line #8 Volume 1 - 269 === page 348 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 13 / ICT FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: ICT B Kits Non-Recurring 2.2.1) ICT UPGRADE (SCD14785) PROCUREMENT NonOrganic 2 / 6.213 (19) Subtotal: Non-Recurring - Subtotal: ICT Subtotal: Procurement, All Modification Items / 6.213 - 2 / 6.213 1 / 0.965 - / - / 0.965 - / - 1 / 0.965 - / - - / - 2 / 1.999 - / - / 1.999 - / - 2 / 1.999 - / - - / 1.999 - / - - - / 6.213 - / 0.965 Modification Item 1 of 1: ICT - / 1.367 - / 0.678 - / 0.137 - / 0.078 Subtotal: Installation - / 1.367 - / 0.678 - / 0.137 - / 0.078 2 / 1.999 - / - / 1.999 - / - 2 / 1.999 - / - - / 1.999 - / - / 0.000 - / 0.078 - / - - / 0.078 - - 1 / 1.060 - / - 1 / 1.125 / - / 1.060 - / - - / - - / 1.060 - / - - / 1.125 - / 0.000 / 0.970 - / 1.439 - / 0.150 - / 0.787 - / 0.974 - / 6.580 / 0.970 - / 1.439 - / 0.150 - / 0.787 - / 0.974 - / 6.580 - / 0.000 7 / 11.362 1 / 1.060 - / 1.125 - 1 / 1.125 - / 11.362 - / - 7 / 11.362 / 11.362 - Installation - Total Total Cost (Procurement + Support + Installation) LI 0933 - LHA/LHD Midlife Navy 7.580 1.643 0.137 2.077 0.000 UNCLASSIFIED Page 46 of 53 2.077 0.970 2.499 P-1 Line #8 0.150 1.912 0.974 17.942 Volume 1 - 270 === page 349 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 13 / ICT MDAP/MAIS Code: Modification Item 1 of 1: ICT Manufacturer Information Manufacturer Name: Dynalec Corporation Manufacturer Location: Sodus, NY Administrative Leadtime (in Months): 0 Production Leadtime (in Months): 20 Dates FY 2025 FY 2026 FY 2027 Contract Dates Jun 2025 Mar 2026 FY 2028 Mar 2029 FY 2029 Delivery Dates Feb 2027 Nov 2027 Nov 2030 FY 2030 FY 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: ICT UPGRADE (SCD14785) PROCUREMENT Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 1 / 1.367 1 / 0.643 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 2.010 FY 2025 - / - 0 / 0.035 0 / 0.137 - / - - / - - / - 1 / 0.687 - / - - / - - / - 0 / 0.000 1 / 0.859 FY 2026 - / - - / - - / - - / - - / - - / - - - / - - / - - / - - FY 2027 - / - - / - - / - 0 / 0.078 0 / 0.000 0 / 0.078 0 / 0.283 2 / 1.398 - / - - / - 0 / 0.000 FY 2028 - / - - / - - / - - / - - / - - / - - / - - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - 0 / 0.041 0 / 0.150 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.045 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 1 / 1.367 Installation Cost 1 / 0.678 0 / 0.137 0 / 0.078 0 / 0.000 0 / 0.078 / - 1 / 0.970 / - 2 / 1.439 - 1 / 0.742 - 0 / 0.150 / - - / - - 0 / 0.000 / - - / - - / - 1 / 0.933 / - - 1 / 0.974 1 / 0.787 / - 2 / 1.759 / - 1 / 1.019 / - - 1 / 0.974 / - 7 / 6.580 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 1 - - 1 - - - - - - - - - 1 - - - 1 1 - - - - - - 1 - - - 1 7 Out 1 - - - - - - - - - - - - - 1 - - - - - - - 2 7 - 1 - - 1 1 - Footnotes: (19) The FY 2027 increase is due to two procurements and two year prior DSA in FY 2027 for two FY 2029 installations. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 47 of 53 P-1 Line #8 Volume 1 - 271 === page 350 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 14 / IVN MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 4.962 8.346 0.386 6.935 0.000 6.935 2.227 9.281 0.424 10.150 12.300 55.011 Total - - - - - - - - - - - - 4.962 8.346 0.386 6.935 0.000 6.935 2.227 9.281 0.424 10.150 12.300 55.011 - - - - - - - - - - - - 4.962 8.346 0.386 6.935 0.000 6.935 2.227 9.281 0.424 10.150 12.300 55.011 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Integrated Voice Network (IVN) upgrade replaces the legacy Ship Service Telephone System (SSTS) with a ruggedized digital communication system that provides command and control communications for tactical employment of forces. The new system will bring LHDs into alignment with LPD, LSD and LCC modernization. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 48 of 53 P-1 Line #8 Volume 1 - 272 === page 351 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 14 / IVN MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: IVN B Kits Non-Recurring 2.2.1) IVN UPGRADE - NonOrganic 1 / 3.171 (20) Subtotal: Non-Recurring - Subtotal: IVN Subtotal: Procurement, All Modification Items / 3.171 - 1 / 3.171 1 / 6.586 - / - / 6.586 - / - 1 / 6.586 - / - - / - 1 / 6.825 - / - / 6.825 - / - 1 / 6.825 - / - - / 6.825 - / - - - / 3.171 - / 6.586 Modification Item 1 of 1: IVN - / 1.791 - / 1.760 - / 0.386 - / 0.110 Subtotal: Installation - / 1.791 - / 1.760 - / 0.386 - / 0.110 1 / 6.825 - / - / 6.825 - / - 1 / 6.825 - / - - / 6.825 - / - / 0.000 - / 0.110 - / - - / 0.110 - - 1 / 7.241 - / - / 7.241 - / - 1 / 7.241 - / - - / 7.241 - / - - / 7.682 - / 7.450 - / 38.955 / 2.227 - / 2.040 - / 0.424 - / 2.468 - / 4.850 - / 16.056 / 2.227 - / 2.040 - / 0.424 - / 2.468 - / 4.850 - / 16.056 - 1 / 7.682 - / 7.682 1 / 7.450 - 1 / 7.682 / 7.450 6 / 38.955 - 1 / 7.450 / 38.955 6 / 38.955 Installation - Total Total Cost (Procurement + Support + Installation) LI 0933 - LHA/LHD Midlife Navy 4.962 8.346 0.386 6.935 0.000 UNCLASSIFIED Page 49 of 53 6.935 2.227 9.281 P-1 Line #8 0.424 10.150 12.300 55.011 Volume 1 - 273 === page 352 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 14 / IVN MDAP/MAIS Code: Modification Item 1 of 1: IVN Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 0 Production Leadtime (in Months): 20 Dates FY 2025 FY 2026 FY 2027 Contract Dates Jun 2025 Mar 2027 FY 2028 Delivery Dates Feb 2027 Nov 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Industrial:: Installation Name: IVN UPGRADE Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 0 / 1.791 1 / 1.580 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 3.371 FY 2025 - / - 0 / 0.180 0 / 0.386 - / - - / - - / - 1 / 1.827 - / - - / - - / - 0 / 0.000 1 / 2.393 FY 2026 - / - - / - - / - - / - - / - - / - - - / - - / - - / - - FY 2027 - / - - / - - / - 0 / 0.110 0 / 0.000 0 / 0.110 0 / 0.400 1 / 1.859 - / - - / - 0 / 0.000 FY 2028 - / - - / - - / - - / - - / - - / - - / - - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - 0 / 0.181 0 / 0.424 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.437 1 / 2.200 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 2.650 1 / 2.650 Total 0 / 1.791 1 / 2.468 2 / 4.850 6 / 16.056 Installation Cost 1 / 1.760 0 / 0.386 0 / 0.110 0 / 0.000 0 / 0.110 / - 1 / 2.227 / - 1 / 2.040 - 1 / 2.031 0 / 0.424 / - - / - - 0 / 0.000 / - - / - 1 / 2.369 / - 1 / 2.636 / - - / - 1 / 2.637 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - 1 - - - - - - - - - 1 - - - 1 - - - - - - - 1 - - - 2 6 Out - - - - - - - - - - - - - - - - - - - - - 3 6 - 1 - - 1 1 - - Footnotes: (20) The FY 2027 increase is due to one procurement and a two-year prior DSA requirement in FY 2027 for the one FY 2029 installation. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 50 of 53 P-1 Line #8 Volume 1 - 274 === page 353 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 15 / IVCN MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 7.329 0.000 0.000 6.163 0.000 6.163 6.557 2.043 8.185 0.306 2.817 33.400 Total - - - - - - - - - - - - 7.329 0.000 0.000 6.163 0.000 6.163 6.557 2.043 8.185 0.306 2.817 33.400 - - - - - - - - - - - - 7.329 0.000 0.000 6.163 0.000 6.163 6.557 2.043 8.185 0.306 2.817 33.400 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Integrated Voice Communications Network (IVCN) Tech Refresh unifies three obsolete communication servers into a single, redundant distributed IP network that will enable expanded communication capabilities for command and control. The refresh will incorporate a wireless, digital telephone system that will improve coordination between shipboard personnel. [IVCN Tech Refresh] LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 51 of 53 P-1 Line #8 Volume 1 - 275 === page 354 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 15 / IVCN MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: IVCN B Kits Non-Recurring 1 / 4.877 - / - - / - / 4.877 - / - - / - 1 / 4.877 - / - - / - - / 4.877 - / - - / - Modification Item 1 of 1: IVCN - / 2.452 Subtotal: Installation - / 2.452 2.2.1) IVCN Tech Refresh - NonOrganic (21) Subtotal: Non-Recurring - Subtotal: IVCN Subtotal: Procurement, All Modification Items 1 / 6.086 - / - / 6.086 - / - 1 / 6.086 - / - - / 6.086 - / - - / 6.086 / 0.000 - / 0.077 / 0.000 - / - - / 0.077 / - - - 1 / 6.086 - 1 / 6.195 - / - / 6.195 - / - 1 / 6.195 - / - - / 6.195 - / - / 0.077 - / 0.362 - / 0.077 - / 0.362 - / 6.086 - 1 / 6.086 1 / 6.319 - / - / 6.319 - / - 1 / 6.319 - / - - / 6.319 - / - - / 0.000 / 2.043 - / 1.866 - / 0.306 - / 2.817 - / 9.923 / 2.043 - / 1.866 - / 0.306 - / 2.817 - / 9.923 - - / / 0.000 - 4 / 23.477 / 23.477 - / - 4 / 23.477 / 23.477 - Installation - / 0.000 - / - - - Total Total Cost (Procurement + Support + Installation) LI 0933 - LHA/LHD Midlife Navy 7.329 0.000 0.000 6.163 0.000 UNCLASSIFIED Page 52 of 53 6.163 6.557 2.043 P-1 Line #8 8.185 0.306 2.817 33.400 Volume 1 - 276 === page 355 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0933 / LHA/LHD Midlife Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 15 / IVCN MDAP/MAIS Code: Modification Item 1 of 1: IVCN Manufacturer Information Manufacturer Name: AVAYA Federal Solutions, INC. Manufacturer Location: Fairfax, VA Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 20 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Jun 2027 Mar 2028 FY 2029 Jun 2030 FY 2030 FY 2031 Delivery Dates Feb 2029 Nov 2029 Feb 2032 Installation Information Method of Implementation: [none specified]:: Installation Name: IVCN Tech Refresh Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 1 / 2.452 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 2.452 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - 0 / 0.077 0 / 0.000 0 / 0.077 0 / 0.283 1 / 1.755 - / - - / - 0 / 0.000 1 / 2.115 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 0.079 0 / 0.288 1 / 1.786 - / - 0 / 0.000 1 / 2.153 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - - / - - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.080 0 / 0.306 1 / 2.817 1 / 3.203 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 1 / 2.452 - / - - / - 0 / 0.077 0 / 0.000 0 / 0.077 0 / 0.362 1 / 2.043 / - 1 / 1.866 0 / 0.306 / - - 1 / 2.817 / - 4 / 9.923 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 1 - - - - - - - - - - - - - - - - - - 1 - - 1 - - - - - - 1 4 Out 1 - - - - - - - - - - - - - - - - - - - - - - - - - - 3 4 - - Footnotes: (21) The FY 2027 increase is due to one procurement and a two-year prior DSA requirement in FY 2027 for the one FY 2029 installation. LI 0933 - LHA/LHD Midlife Navy UNCLASSIFIED Page 53 of 53 P-1 Line #8 Volume 1 - 277 === page 356 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 278 === page 357 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0934 / LCC 19/20 Extended Service Life Program Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 72.145 7.352 19.276 0.766 0.000 0.766 0.031 0.032 0.033 0.035 - 99.670 Total - - - - - - - - - - - - 72.145 7.352 19.276 0.766 0.000 0.766 0.031 0.032 0.033 0.035 - 99.670 - - - - - - - - - - - - 72.145 7.352 19.276 0.766 0.000 0.766 0.031 0.032 0.033 0.035 - 99.670 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The FY 2027 budget provides funding for Extended Service Life Program (ESLP) targeted modernization of various Hull, Mechanical and Electrical (HM&E) systems onboard the Amphibious Command Ship (LCC) 19 hull. The major modernization efforts include Ship Service/Emergency Diesel Generator Upgrades (SS/EDG). [P40A / SS/EDG Genset Upgrade]: The Ship Service Generator upgrades replace the #1SS/EDG and #3SSDG with a 2000KW unit, similar to the existing #3SSDG but shock qualified, and accomplishes necessary distribution modifications. This replacement adds an additional 1425KW to the Diesel generating plant and provides the additional capacity to provide ample power to support full ship's functions/C4I capabilities on a continuous basis. The design also includes the installation of dual redundant voltage regulators. LI 0934 - LCC 19/20 Extended Service Life Program Navy UNCLASSIFIED Page 1 of 8 P-1 Line #9 Volume 1 - 279 === page 358 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0934 / LCC 19/20 Extended Service Life Program Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a LCC 19/20 Extended Service Life Program - / 56.247 - / 2.371 - / 19.276 - / 0.766 / - - / 0.766 P-3a 1 / LCC 19/20 EXTENDED SERVICE LIFE PROGRAM (TBD) - / 15.898 - / 4.981 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-40 Total Gross/Weapon System Cost - / 72.145 - / 7.352 - / 19.276 - / 0.766 - / 0.000 - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code - / 0.766 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a LCC 19/20 Extended Service Life Program P-3a 1 / LCC 19/20 EXTENDED SERVICE LIFE PROGRAM (TBD) - - / 0.000 / - - / 0.000 / - - / 0.000 / - - / 0.000 / - P-40 Total Gross/Weapon System Cost - / 0.031 - / 0.032 - / 0.033 - / 0.035 - / - - / - / 0.000 - / 20.879 / - - / 99.670 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The funding in FY 2027 supports finalization of installation efforts of the Ship Service/Emergency Diesel Generator Upgrade alteration for the LCC 19 Docking Selected Restricted Availability. LI 0934 - LCC 19/20 Extended Service Life Program Navy UNCLASSIFIED Page 2 of 8 P-1 Line #9 Volume 1 - 280 === page 359 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0934 / LCC 19/20 Extended Service Life Program Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: LCC 19/20 Extended Service Life Program FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) LCC 20 Propulsion Main Shaft 1.1) LCC 20 Propulsion Main Shaft Battle Spare A 3,279K Subtotal: 1) LCC 20 Propulsion Main Shaft 1 3.279 - - - - - - - - - - - - - - - - - 3.279 - - - - - - - - - - - - - - - - - 1.300 - - - - - - - - - - - - - - - - - 6.500 - - - - - - - - - - - - - - - - - 7.800 - - - - - - - - - - - - - - - - - 0.525 - - 0.483 - - 19.276 - - 0.766 - - - - - 0.766 - - 5.710 - - 0.314 - - - - - - - - - - - - - - 30.866 - - 0.284 - - - - - - - - - - - - - - 1.658 - - 0.120 - - - - - - - - - - - - - - 3.601 - - 0.612 - - - - - - - - - - - - - - 2.808 - - 0.558 - - - - - - - - - - - - Subtotal: 3) Ship Electrical Improvements - - 45.168 - - 2.371 - - 19.276 - - 0.766 - - - - - 0.766 Total - - 56.247 - - 2.371 - - 19.276 - - 0.766 - - - - - 0.766 2) Prior Year Funding 2.1) LD001 - LCC19 VS-50+Oil Water Separator A 2.2) LD001 LCC20 Electrical Improvements A Subtotal: 2) Prior Year Funding 3) Ship Electrical Improvements 3.1) SS/EDG Genset Upgrade (2) A 3.2) IVN Upgrade A 3.3) General Announcing System Upgrade A 3.4) 21/24MC CAPT/ FLAG CMD Intercom Replacement A 3.5) Ship Control System (SCS) Modernization A 3.6) Pilot House Redesign A (1) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (1) Engineering services costs prior to first install are due to non-recurring engineering costs, which include first article development and environmental quality testing. Also included are software development and system engineering milestone reviews and cyber security hardening under the Risk Management Framework. Installation funding for a ship is divided over a three-year period. Installation execution funding in the year of availability, Design Service Allocation (DSA) two years prior to and prior to the availability. This includes ship checks, ship installation drawing (SID) development, logistic documentation development, and long lead time material (LLTM) procurements. Installation costs across the FYDP vary depending on current port rates. Port rates are updated every year by the Commander, Navy Regional Maintenance Center (CNRMC) based on the forecasted port loading model. Port loading rate forecasts are the rates recommended for all budgeted maintenance and organic modernization within a specific port. Individual ship's availability durations vary dependent upon the integration of ship's maintenance and modernization work packages. Engineering services are higher due to labor requirements for system assembly prior to installation. LI 0934 - LCC 19/20 Extended Service Life Program Navy UNCLASSIFIED Page 3 of 8 P-1 Line #9 Volume 1 - 281 === page 360 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0934 / LCC 19/20 Extended Service Life Program Aggregated Items Title: LCC 19/20 Extended Service Life Program (2) The funding in FY 2027 supports finalization of the installation of the Ship Service/Emergency Diesel Generator Upgrade alteration planned for the LCC 19 Docking Selected Restricted Availability. Installation of a prior model of generator sets was originally planned for 2016. Ship Installation Drawings for the current model of generator sets required an Independent Government Estimate of installation cost, which was completed September 2024. The FY 2027 funding takes into consideration that installation of the planned alteration will be nearing completion with a ramping down of costs. LI 0934 - LCC 19/20 Extended Service Life Program Navy UNCLASSIFIED Page 4 of 8 P-1 Line #9 Volume 1 - 282 === page 361 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0934 / LCC 19/20 Extended Service Life Program ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / LCC 19/20 EXTENDED SERVICE LIFE PROGRAM MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 15.898 4.981 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 20.879 Total - - - - - - - - - - - - 15.898 4.981 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 20.879 - - - - - - - - - - - - 15.898 4.981 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 20.879 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: [SS/EDG Genset Upgrade] The Ship Service Generator upgrades replace the #1SS/EDG and #3SSDG with a 2000KW unit, similar to the existing #3SSDG but shock qualified, and accomplishes necessary distribution modifications. This replacement will add an additional 1425KW to the Diesel generating plant and will provide the additional capacity to ensure there is ample power to support full ship's functions/C4I capabilities on a continuous basis. The design will also include the installation of dual redundant voltage regulators. LI 0934 - LCC 19/20 Extended Service Life Program Navy UNCLASSIFIED Page 5 of 8 P-1 Line #9 Volume 1 - 283 === page 362 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0934 / LCC 19/20 Extended Service Life Program Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 1 / LCC 19/20 EXTENDED SERVICE LIFE PROGRAM FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: LCC 19/20 EXTENDED SERVICE LIFE PROGRAM A Kits Recurring 1.1.1) Integrated Bridge Display System (IBDS) NonOrganic 1 / 5.237 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 5.237 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 9.972 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 9.972 - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 15.209 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 15.209 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.228 - / - - / - - / - - / - - / - - / - - / - - / - - / - / - - / 0.228 - / 0.228 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 - / 0.228 Modification Item 1 of 1: LCC 19/20 EXTENDED SERVICE LIFE PROGRAM - / 0.461 - / 4.981 / 0.000 - / 0.000 - / 5.442 Subtotal: Installation - / 0.461 - / 4.981 / - - / 0.000 - / 5.442 Subtotal: Recurring - - / - 1 / 5.237 / 0.000 - - / 5.237 Non-Recurring 1.2.1) SS/EDG Genset Upgrade - NonOrganic Subtotal: Non-Recurring - Subtotal: LCC 19/20 EXTENDED SERVICE LIFE PROGRAM Subtotal: Procurement, All Modification Items - - / - 1 / 9.972 / 0.000 - / / 0.000 - - / 9.972 2 / 15.209 / 15.209 - Support (All Modification Items) 2.1) Engineering Support-Reoccurring Subtotal: Support - Installation - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) 15.898 LI 0934 - LCC 19/20 Extended Service Life Program Navy 4.981 0.000 0.000 0.000 UNCLASSIFIED Page 6 of 8 0.000 0.000 0.000 P-1 Line #9 0.000 0.000 0.000 20.879 Volume 1 - 284 === page 363 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0934 / LCC 19/20 Extended Service Life Program Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / LCC 19/20 EXTENDED SERVICE LIFE PROGRAM MDAP/MAIS Code: Modification Item 1 of 1: LCC 19/20 EXTENDED SERVICE LIFE PROGRAM Manufacturer Information Manufacturer Name: VARIOUS Manufacturer Location: VARIOUS Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 20 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 FY 2030 FY 2031 Contract Dates Delivery Dates Manufacturer Name: VARIOUS Manufacturer Location: TBD Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 24 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Delivery Dates Installation Information Method of Implementation: [none specified]:: Installation Name: Integrated Bridge Display System (IBDS) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 0 / 0.279 1 / 1.998 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 2.277 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 0 / 0.279 1 / 1.998 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Installation Cost LI 0934 - LCC 19/20 Extended Service Life Program Navy UNCLASSIFIED Page 7 of 8 P-1 Line #9 1 / 2.277 Volume 1 - 285 === page 364 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0934 / LCC 19/20 Extended Service Life Program Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / LCC 19/20 EXTENDED SERVICE LIFE PROGRAM MDAP/MAIS Code: Modification Item 1 of 1: LCC 19/20 EXTENDED SERVICE LIFE PROGRAM Installation Information Method of Implementation: [none specified]:: Installation Name: Integrated Bridge Display System (IBDS) Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - 1 - - - - - - - - - - - - - - - - - - - - - - - - - - 1 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 - 1 Method of Implementation: [none specified]:: Installation Name: SS/EDG Genset Upgrade Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 0 / 0.182 1 / 2.983 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 3.165 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 0 / 0.182 1 / 2.983 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Installation Cost 1 / 3.165 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - 1 - - - - - - - - - - - - - - - - - - - - - - - - - - 1 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 - LI 0934 - LCC 19/20 Extended Service Life Program Navy 1 UNCLASSIFIED Page 8 of 8 P-1 Line #9 Volume 1 - 286 === page 365 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0935 / Pollution Control Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 534.918 534.918 534.918 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - 23.440 22.477 22.506 0.000 22.506 28.132 31.042 30.243 30.807 - - - - - - - - - 23.440 22.477 22.506 0.000 22.506 28.132 31.042 30.243 30.807 - - - - - - - - - 23.440 22.477 22.506 0.000 22.506 28.132 31.042 30.243 30.807 Total 427.660 1,151.225 427.660 1,151.225 427.660 1,151.225 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: POLLUTION CONTROL SYSTEMS/EQUIPMENT (PCE) PROGRAM Funds for the PCE Program are used to procure, install, and modernize Navy shipboard waste management equipment, systems, and technologies. The PCE Program ensures that Navy ships comply with applicable legal and statutory requirements (i.e., Federal laws and statutes, international regulations, and Department of War (DoW) and Navy instructions) governing environmental protection and shipboard discharge requirements. These requirements collectively restrict overboard discharge of oily wastewater, sewage, solid waste, plastic waste, and hazardous waste. Failure to comply risks potential personal, civil, and criminal liability; and can significantly impose constraints on the operational capabilities of Navy ships. Funding specifically supports procurements and installations for the Oil Pollution Abatement (OPA) Improvements program, the Dry Waste Processing Suites (DWPS) Improvements program, and the Hazardous Material Stowage Modernization program. SHORE BASED POLLUTION EQUIPMENT - (Logistics) The shore-based funds provide for equipment required to clean up Navy oil spills in the near shore to open sea environment and in areas distant from fixed bases as required by the Federal Water Pollution Control Act - Public Law 92-500, 33CFR154-155. The law created a National Oil and Hazardous Substance Pollution Contingency Plan and designates the DoW as one of the primary agencies responsible for promotion of effective operation of the plan. The Supervisor of Salvage is assigned the responsibility to provide technical expertise, resources, and equipment for response to Navy-originated spills of oil and other hazardous material in remote areas, coastal waters and/or the open sea. Major items of procurement include the following: [P40A / HF067 VESSEL SKIMMER SYSTEMS]: These systems are self-propelled skimmers designed for near-shore and low sea-state open ocean environments and are used in conjunction with oil containment boom for mechanical recovery of oil on the water. They are designed to be rapidly transportable to the scene of an oil spill. [P40A / HF068 UNDERWATER OIL RECOVERY SYSTEM]: A rapidly deployable system that provides grinders, sampling tools, sensors, cutters, connections, pumps, hoses, and hydraulic tools to locate, sample, penetrate, and offload tanks below the water. [P40A / HF069 42" BOOM REPLACEMENT SECTIONS]: Ocean Booming Systems (2000FT each) and Marco self-propelled skimming systems (600FT each) use standardized high buoyancy, high flexibility NAVY 42HB inflatable boom purchased in 55FT sections to provide phased replacement of rubber boom damaged or worn beyond economical repair. The other components of these systems have a longer useful life and need replacement at much longer intervals. LI 0935 - Pollution Control Equipment Navy UNCLASSIFIED Page 1 of 21 P-1 Line #10 Volume 1 - 287 === page 366 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0935 / Pollution Control Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / HF077 RUBBER BOAT REPLACEMENT]: Various spill response systems for ship salvage in harbor and near shore environments contain rubber boats to place and maintain skimmers, boom and anchors. These boats and motors are reaching the end of service life and require replacement. [P40A / HF078 SALVAGE SKIMMER SYSTEMS SERVICE LIFE EXTENSION]: These systems are a collection of small, special-purpose skimmers, containment boom, transfer pumps, storage tanks, sorbents, and ancillary equipment intended as a stand-alone response package for small, salvage-related spills inside and adjacent to ships. This replaces worn out and obsolete components. [P40A / HF079 ARTIC OIL/HEAVY DEBRIS RECOVERY SYSTEM SERVICE LIFE EXTENSION]: This system is designed to recover oil in an arctic and/or heavy debris environment where specific weather conditions render normal skimmer recovery methods useless. This replaces worn out and obsolete components. [P40A / HF082 VISCOUS OIL PUMPING SYSTEM IMPROVEMENT]: These provide specialized pumps and water injection to pump very viscous fluids. Large pumps are needed to move large quantities of oil to lighter a stricken ship. Additionally, oil that weathers, emulsifies, or mixes with other contaminants will become thick and viscous to the point that regular centrifugal pumping systems will not move the oil. This upgrades capabilities of existing systems. [P40A / HF084 - HYDRAULIC SUBMERSIBLE PUMPS]: Hydraulic submersible pumps for lightering oil or dewatering. These cylindrically shaped pumps are capable of fitting down a butterworth fitting to remove oil from tanks on damaged or grounded ships. A "Butterworth" fitting is a trade name for a fitting that connects to high pressure tank cleaning hoses. Butterworth is a manufacturer (butterworth.com) and their fittings are an industry standard for this application. [P40A / HF086 - FLEET EXERCISE HOT TAP TRAINING KITS]: The hot tap training kit provides a complete kit for training, including communications, test plates, hull mock-ups, fasteners, rigging, and multiple cutting systems, flange systems, and pumping systems. [P40A / HF087 - LIGHT OIL RECOVERY CLASS 5 SKIMMER INSERTS]: Disk skimmer inserts and ancillary support and installation equipment for upgrading modular and standard skimmer systems. Includes skimmer, disks, hoses, flanges, valves, handling hardware, and safety hardware. [P40A / HF091 - VESSEL OF OPPORTUNITY (VOSS) SHIP ADAPTER MOUNTING KITS]: Vessel of Opportunity (VOSS) ship adapter mounting kits. [P40A / HF092 - VAN REFURBISHMENT]: For the new purchase or refurbishment of shipping containers to be used as equipment system vans. Includes vans, transportation, flooring, rollers, electrical components, doors, structural elements, gaskets, paint, engineering, and design. [P40A / HF093 - LOGISTICS SUPPORT EQUIPMENT]: Logistics Support Equipment to include weight handling support systems (forks, rigging, extensions, stabilizers, etc). [P40A / HF094 - SKIMMER SUPPORT EQUIPMENT]: Skimmer Support Equipment to include equipment boxes and containers, engineering, and materials for the procurement, integration, and maintenance of skimmer support systems, including boat racks, rollers, handling equipment, pumps, hoses, valves, piping, hydraulics, and electrical controls. [P40A / HF095 - FIELD LIGHTING]: Field lighting equipment to include tower structures, stands, electrical wiring and controls, bulbs, reflectors, shields, switches, boxes, skids, carts, rigging, and tools. [P40A / HF096 TRANSFER BLADDERS 10K GALLON]: Towable transfer 10,000 gallon bladder system requires replacement to nose hard piping and hose connection to improve handling at speeds above 3 knots and to accommodate 4 inch hose from skimmer design improvements. [P40A / HF097 MINI VESSEL OF OPPORTUNITY (VOSS) SYSTEM]: Containerized smaller skimming system that can be deployed rapidly and operated from a smaller Vessel of Opportunity. [P40A / HF098 - NOFI VESSEL OF OPPORTUNITY (VOSS) SYSTEM]: Vessel of Opportunity (VOSS) offshore skimming system soft rubber and fabric components are reaching the end of their service life. These are provided by only one vendor, NOFI, and are the Navy's only offshore systems. The hard components (reels, vans, tooling etc) will be retained and reused. LI 0935 - Pollution Control Equipment Navy UNCLASSIFIED Page 2 of 21 P-1 Line #10 Volume 1 - 288 === page 367 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0935 / Pollution Control Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / HF830 PRODUCTION ENGINEERING]: Air conditioning plant kit and software quality control, technical manual and complete conversion instruction revisions, technical reports based on investigative efforts of Original Equipment Manufacturer (OEM) quality assurance or obsolescence issues, and support equipment removal from inactive ships or other Navy assets. Development of technical manuals, Planned Maintenance System (PMS), Provisioning Technical Documentation (PTD), Program Support Data (PSD) and allowance Parts List (APLs), engineering to manage procurement and material, and in support of design reviews. [P3A / HF024 CFC-114 (R-114) AC CONVERSION]: The production of chlorofluorocarbon (CFC)-based refrigerants (including CFC-12 and CFC R-114) was prohibited after 31 DEC 95 by the Clean Air Act of 1990. Presidential Executive Order 13693 calls for federal agencies to "promote sustainable acquisition and procurement by ensuring that each of the following environmental performance and sustainability factors are included [...] alternatives to ozone-depleting substances". The Navy is currently dependent on CFC-based refrigerants for the mission-critical cooling of (1) vital electronics and weapon systems, (2) food and medical stowage, and (3) inhabited spaces aboard surface ships and submarines. To counter the immediate threat of production cessation on uninterrupted Fleet operations, DoW directed the Defense Logistics Agency to establish a stockpile of CFC-based refrigerants. The stockpile was sized to support Fleet operations until the last CFC-based systems are retired or converted to ozone-friendly refrigerants. This program procures and installs conversion kits on existing CFC R-114 Air-Conditioning (A/C) plants onboard surface ships. The inventory objective for CFC R-114 is 402 converted units. [P3A - 2 / HF031 OPA IMPROVEMENTS]: Existing OPA systems have demonstrated poor operational availability, maintainability, and reliability. This comprehensive effort addresses the entire OPA system, from holding tanks to overboard discharge, leveraging recommended improvements new to the Fleet and approved, partially completed alterations. The alterations needed to correct design deficiencies are ship specific and require ship checks to confirm the current configuration as prior alterations may have completed one or several of the recommended improvements. The alterations may include but are not limited to: installation of new tank level sensors; upgrades to the Oily Water Separator (OWS) and the Oil Content Monitor (OCM), correction of OWS suction problems, correction of OCM inlet & outlet piping including related of flush water piping configuration problems, and upgrade of oily waste transfer pump relief valve. Extensive work will occur with LHD-1 Class upgrades to convert the existing OWS to the VS-50 OWS and DDG-51 through DDG-88 ships will receive the Oily Waste Membrane System to produce an effluent that meets the 15 ppm maximum oil discharge requirement. [P3A - 2 / HF031 Oil Pollution Abatement (OPA) Improvements]: HF5IN - INSTALLATION OF EQUIPMENT - EXPEDITIONARY WARFARE Funding is for installation of equipment for the Fleet Modernization Program installations. HF6IN - INSTALLATION OF EQUIPMENT - SURFACE WARFARE Funding is for installation of equipment for the Fleet Modernization Program installations [P3A - 3 / HF032 DRY WASTE PROCESSING SUITE IMPROVEMENTS]: The Fleet is challenged to keep solid waste equipment operating and sanitary while maintaining compliance with the Act to Prevent Pollution from Ships (APPS). Legacy shipboard solid waste equipment systems are experiencing decreasing reliability, maintainability, and availability (RMA) due to the following issues: - Equipment service life issues and risks: Legacy equipment have been in service for more than 10 to 20 years and are at risk of reaching the end of their service life, reduced RMA, and experiencing parts availability and obsolescence issues. - Increasing quantity of shipboard plastic waste: The quantity of shipboard plastic waste has significantly increased by more than 50%, which risks overwhelming the processing capacity of legacy equipment. - Increasing Fleet population at sea: The increased population of men and women at sea has increased sanitary and hygiene-related wastes that cause unique treatment challenges for legacy shipboard solid waste systems equipment. - Challenges managing increasing hazardous material (HM) inventory at sea: The Fleet is experiencing issues with storing, controlling, and managing HM inventory due to increased depth and range of HM, longer missions, greater array of equipment, and increased operational tempo. Improperly stored HM presents personnel, safety, environmental, and equipment risks to the Fleet at sea. The Dry Waste Processing Suites (DWPS) Improvements Program will improve RMA and reduce obsolescence, sanitation, and safety issues by modernizing legacy shipboard solid waste systems. The DWPS Improvements Program will decrease labor-hours by improving operation and maintenance, increase system availability, address current and projected obsolescence issues, and decrease component failures by redesign and equipment optimization. The improvement of legacy solid waste equipment, and transition and implementation of new solid waste processing tools will ensure the safe and efficient management of solid waste and HM. [P3A - 3 / Dry Waste Processing Suite Improvements]: HF5IN - INSTALLATION OF EQUIPMENT - EXPEDITIONARY WARFARE Funding is for installation of equipment for the Fleet Modernization Program installations. LI 0935 - Pollution Control Equipment Navy UNCLASSIFIED Page 3 of 21 P-1 Line #10 Volume 1 - 289 === page 368 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0935 / Pollution Control Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A HF6IN - INSTALLATION OF EQUIPMENT - SURFACE WARFARE Funding is for installation of equipment for the Fleet Modernization Program installations LI 0935 - Pollution Control Equipment Navy UNCLASSIFIED Page 4 of 21 P-1 Line #10 Volume 1 - 290 === page 369 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0935 / Pollution Control Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code P-5a Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Pollution Control Equipment - / 30.393 - / 2.207 - / 2.103 - / 1.984 / - - / 1.984 P-3a 1 / HF024 CFC-114 (R-114) AC CONVERSION (AIT) - / 369.339 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-3a 2 / HF031 OPA IMPROVEMENTS (AIT) - / 122.852 - / 16.459 - / 9.206 - / 8.749 - / 0.000 - / 8.749 P-3a 3 / HF032 DRY WASTE PROCESSING SUITE IMPROVEMENTS (AIT) - / 12.334 - / 4.774 - / 11.168 - / 11.773 - / 0.000 - / 11.773 P-40 Total Gross/Weapon System Cost - / 534.918 - / 23.440 - / 22.477 - / 22.506 - / 0.000 - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code - / 22.506 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Pollution Control Equipment P-3a 1 / HF024 CFC-114 (R-114) AC CONVERSION (AIT) P-5a - - / 0.000 / - - / 0.000 / - - / 0.000 / - - / 0.000 / - P-3a 2 / HF031 OPA IMPROVEMENTS (AIT) - / 7.876 - / 15.267 - / 19.263 - / 19.420 P-3a 3 / HF032 DRY WASTE PROCESSING SUITE IMPROVEMENTS (AIT) - / 18.168 - / 13.642 - / 8.800 - P-40 Total Gross/Weapon System Cost - / 28.132 - / 31.042 - / 30.243 - - / - - / - / 0.000 - / 369.339 - / 208.974 - / 428.066 / 9.164 - / 218.686 / 30.807 - / 427.660 - / 308.509 / 1,151.225 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Increase from FY26 to FY27 for improvements of Dry Waste Suite of systems, specifically for Incinerator improvements onboard Carriers CVN 68 CL, and CVN 78 Plasma Arc Waste Destruction System (PAWDS). Additional factors impacting variations in costs due to improvements on different ship classes, location of availability and the pollution prevention equipment installed within suite that is modernized. LI 0935 - Pollution Control Equipment Navy UNCLASSIFIED Page 5 of 21 P-1 Line #10 Volume 1 - 291 === page 370 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0935 / Pollution Control Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Pollution Control Equipment Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) LOGISTICS 1.1) HF067 VESSEL SKIMMER SYSTEMS A (†) 1.2) HF068 UNDERWATER OIL RECOVERY SYSTEM A 1.3) HF069 42" BOOM REPLACEMENT A SECTIONS 149,947.37 19 2.849 161,830.00 0.162 - - - 311,750.00 4 1.247 - - - - - 416,760.00 11,968.75 128 1.532 12,326.00 37 0.456 12,607.00 34 0.429 15,416.67 12 0.185 15,750.00 3 0.047 16,555.00 1 0.017 - - - - 101,000.00 1 0.101 - - - - - - - - - - - - - 1 - - - - - - - - - 1 0.417 - - - 416,760.00 1 0.417 13,211.00 39 0.515 - - - 13,211.00 39 0.515 17,500.00 2 0.035 - - - 17,500.00 2 0.035 - - - - 0.136 - - - - - - - 0.136 - - - (†) 1.4) HF077 RUBBER BOAT A REPLACEMENT (†) 1.5) HF078 SALVAGE SKIMMER SYSTEMS SERVICE LIFE EXTENSION A - - - - - - - (1)(†) 1.6) HF079 ARTIC OIL/HEAVY DEBRIS RECOVERY SYSTEM SERVICE LIFE A 131,000.00 1 0.131 - - - 135,782.00 1 135,782.00 1 0.136 (†) EXTENSION 1.7) HF082 VISCOUS OIL PUMPING SYSTEM IMPROVEMENT 175,227.00 1 0.175 - - - - - (2)(†) 1.8) HF084 HYDRAULIC SUBMERSIBLE PUMPS A A 62,666.67 3 0.188 - - - 68,165.00 2 68,165.00 2 0.136 64,000.00 2 0.128 65,750.00 2 0.132 66,769.00 2 0.134 - - - - - - - - - 188,000.00 1 0.188 192,066.00 1 0.192 195,837.00 1 0.196 - - - - - - - - - 81,000.00 2 0.162 2 0.167 1 0.084 0.172 - - - (3)(†) 1.9) HF086 - FLEET EXERCISE HOT TAP A (†) TRAINING KITS 1.10) HF087 - LIGHT OIL RECOVERY CLASS 5 SKIMMER A (†) INSERTS 1.11) HF091 - VESSEL OF OPPORTUNITY (VOSS) SHIP ADAPTER MOUNTING KITS A 83,500.00 84,240.00 85,925.00 2 85,925.00 2 0.172 (4)(†) LI 0935 - Pollution Control Equipment Navy UNCLASSIFIED Page 6 of 21 P-1 Line #10 Volume 1 - 292 === page 371 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0935 / Pollution Control Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 1.12) HF092 - VAN A REFURBISHMENT 1.13) HF093 - LOGISTICS SUPPORT (†) MAIS Code Unit Cost Qty (Each) 65,000.00 Unit Cost ($ M) 2 ($) 0.130 Qty (Each) 66,300.00 FY 2026 Total Cost Unit Cost ($ M) 1 ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) 0.066 67,600.00 4 0.270 - 175,000.00 1 0.175 25,057.00 5 0.125 25,351.00 - Qty (Each) 68,952.00 FY 2027 OOC Total Cost Unit Cost ($ M) 2 ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) 68,952.00 ($ M) 0.138 - - - 2 0.138 - - - - 4 0.101 - - - 25,351.00 4 0.101 19,910.00 2 0.040 - - - 19,910.00 2 0.040 1 0.294 - - - 293,890.00 1 0.294 A - EQUIPMENT - - - - - - - - - (5)(†) 1.14) HF094 SKIMMER SUPPORT A (†) EQUIPMENT 1.15) HF095 - FIELD (†) A LIGHTING 1.16) HF096 TRANSFER BLADDERS 10K GALLON ($) FY 2025 Total Cost Aggregated Items Title: Pollution Control Equipment 24,000.00 2 0.048 24,367.00 1 0.024 18,000.00 2 0.036 18,352.00 2 0.037 277,000.00 1 0.277 284,540.00 1 0.285 288,080.00 1 0.288 293,890.00 105,000.00 1 0.105 107,100.00 1 0.107 109,200.00 1 0.109 - - - - - - - - - 392,000.00 1 0.392 400,576.00 1 0.401 - - - - - - - - - - - - - - A (†) 1.17) HF097 MINI VESSEL OF OPPORTUNITY (VOSS) SYSTEM (†) 1.18) HF098 NOFI VESSEL OF OPPORTUNITY (VOSS) SYSTEM A A (†) Subtotal: 1) LOGISTICS - - 7.467 - - 2.207 - - 2.103 - - 1.984 - - - - - 1.984 - - 3.896 - - - - - - - - - - - - - - - - - 3.896 - - - - - - - - - - - - - - - - - 9.018 - - - - - - - - - - - - - - - - - 9.018 - - - - - - - - - - - - - - - - - 10.012 - - - - - - - - - - - - - - - Subtotal: 4) AIR WARFARE - - 10.012 - - - - - - - - - - - - - - - Total - - 30.393 - - 2.207 - - 2.103 - - 1.984 - - - - - 1.984 2) EXPEDITIONARY WARFARE 2.1) HF830 PRODUCTION ENGINEERING A Subtotal: 2) EXPEDITIONARY WARFARE 3) SURFACE WARFARE 3.1) HF830 PRODUCTION ENGINEERING A Subtotal: 3) SURFACE WARFARE 4) AIR WARFARE 4.1) HF031 OIL POLLUTION ABATEMENT IMPROVEMENTS A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a LI 0935 - Pollution Control Equipment Navy UNCLASSIFIED Page 7 of 21 P-1 Line #10 Volume 1 - 293 === page 372 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0935 / Pollution Control Equipment Aggregated Items Title: Pollution Control Equipment Footnotes: (1) HF078 - These systems are a collection of small, special-purpose skimmers, containment boom, transfer pumps, storage tanks, sorbents, and ancillary equipment intended as a stand-alone response package for small, salvage-related spills inside and adjacent to ships. This replaces worn out and obsolete components. (2) (3) HF082 - Higher viscosity fluids require more energy to pump due to increased resistance to flow. As a result, the power requirements for the pump will increase, leading to higher energy consumption and operational costs. HF084 - A "Butterworth" fitting is a trade name for a fitting that connects to high pressure tank cleaning hoses. Butterworth is a manufacturer (butterworth.com) and their fittings are an industry standard for this application. The program specifically uses these for Hot Tap missions, where it is drill into sunken ships and empty their tanks of any existing oil or fuel. (4) HF091 - The NOFI Current Buster is a high-speed open ocean skimmer that is a Vessel of Opportunity Skimming System which is made to be attached to the side of a suitable vessel and then driven along to collect oil. The program currently does this with the Coast Guard Juniper Class Buoy Tenders, where the program uses adapter mounting kits to connect to the existing bulkhead hole patterns in those ships for their previous SORS skimming systems. Each USCG Buoy Handler has a different hole pattern, and it has to be redesigned with mounting plates over time to capture these. Increase is due to moving towards making mounting plates for the smaller USCG Keeper Class tenders as well as the new Navy T-ATS class ships. (5) HF093 - This is for the upkeep, replacement, and annual certification of weight handling equipment necessary to move, load, and position pollution systems (forks, rigging, extensions, stabilizers, etc). LI 0935 - Pollution Control Equipment Navy UNCLASSIFIED Page 8 of 21 P-1 Line #10 Volume 1 - 294 === page 373 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Aggregated Items: Pollution Control Equipment FY Contractor and Location Method/Type or Funding Vehicle 1.1) HF067 VESSEL SKIMMER SYSTEMS 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Feb 2025 Feb 2026 1 161,830.00 Y 1.3) HF069 42" BOOM REPLACEMENT SECTIONS 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Feb 2025 Feb 2026 37 12,326.00 Y 1.3) HF069 42" BOOM REPLACEMENT SECTIONS 2026 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Mar 2026 Mar 2027 34 12,607.00 Y 1.3) HF069 42" BOOM REPLACEMENT SECTIONS 2027 TBD / TBD C / TBD ** NO PCO ** Oct 2026 Oct 2027 39 13,211.00 Y 1.4) HF077 RUBBER BOAT REPLACEMENT 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Feb 2025 Feb 2026 3 15,750.00 Y 1.4) HF077 RUBBER BOAT REPLACEMENT 2026 GPC / IRVINE, CA C / CPFF WASHINGTON,DC May 2026 May 2027 1 16,555.00 Y 1.4) HF077 RUBBER BOAT REPLACEMENT 2027 TBD / TBD C / TBD ** NO PCO ** Oct 2026 Oct 2027 2 17,500.00 Y 2026 GPC / IRVINE, CA C / CPFF WASHINGTON, DC May 2026 May 2027 1 101,000.00 Y 1.6) HF079 ARTIC OIL/HEAVY DEBRIS RECOVERY SYSTEM SERVICE LIFE EXTENSION 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Feb 2025 Feb 2026 1 131,000.00 Y 1.6) HF079 ARTIC OIL/HEAVY DEBRIS RECOVERY SYSTEM SERVICE LIFE EXTENSION 2027 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 1 135,782.00 Y 2026 GPC / IRVINE, CA C / CPFF WASHINGTON, DC May 2026 May 2027 1 175,227.00 Y 2027 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 2 68,165.00 Y 1.9) HF086 - FLEET EXERCISE HOT TAP TRAINING KITS 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Feb 2025 Feb 2026 2 65,750.00 Y 1.9) HF086 - FLEET EXERCISE HOT TAP TRAINING KITS 2026 GPC / IRVINE, CA C / CPFF WASHINGTON, DC May 2026 May 2027 2 66,769.00 Y 1.10) HF087 - LIGHT OIL RECOVERY CLASS 5 SKIMMER INSERTS 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Feb 2025 Feb 2026 1 192,066.00 Y 1.10) HF087 - LIGHT OIL RECOVERY CLASS 5 SKIMMER INSERTS 2026 GPC / IRVINE, CA C / CPFF WASHINGTON, DC May 2026 May 2027 1 195,837.00 Y Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 0935 / Pollution Control Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) LOGISTICS 1.5) HF078 SALVAGE SKIMMER SYSTEMS SERVICE LIFE EXTENSION (1) 1.7) HF082 VISCOUS OIL PUMPING SYSTEM IMPROVEMENT (2) 1.8) HF084 - HYDRAULIC SUBMERSIBLE PUMPS (3) LI 0935 - Pollution Control Equipment Navy UNCLASSIFIED Page 9 of 21 P-1 Line #10 Volume 1 - 295 === page 374 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Aggregated Items: Pollution Control Equipment FY Contractor and Location Method/Type or Funding Vehicle 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Feb 2025 Feb 2026 2 83,500.00 Y 2026 GPC / IRVINE, CA C / CPFF WASHINGTON, DC May 2026 May 2027 1 84,240.00 Y 2027 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 2 85,925.00 Y 1.12) HF092 - VAN REFURBISHMENT 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Feb 2025 Feb 2026 1 66,300.00 Y 1.12) HF092 - VAN REFURBISHMENT 2026 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Mar 2026 Mar 2027 4 67,600.00 Y 1.12) HF092 - VAN REFURBISHMENT 2027 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 2 68,952.00 Y 2026 GPC / IRVINE, CA C / CPFF WASHINGTON, DC May 2026 May 2027 1 175,000.00 Y 1.14) HF094 - SKIMMER SUPPORT EQUIPMENT 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Feb 2025 Feb 2026 1 24,367.00 Y 1.14) HF094 - SKIMMER SUPPORT EQUIPMENT 2026 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Mar 2026 Mar 2027 5 25,057.00 Y 1.14) HF094 - SKIMMER SUPPORT EQUIPMENT 2027 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 4 25,351.00 Y 1.15) HF095 - FIELD LIGHTING 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Feb 2025 Feb 2026 2 18,352.00 Y 1.15) HF095 - FIELD LIGHTING 2027 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 2 19,910.00 Y 1.16) HF096 TRANSFER BLADDERS 10K GALLON 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Feb 2025 Feb 2026 1 284,540.00 Y 1.16) HF096 TRANSFER BLADDERS 10K GALLON 2026 GPC / IRVINE, CA C / CPFF WASHINGTON, DC May 2026 May 2027 1 288,080.00 Y 1.16) HF096 TRANSFER BLADDERS 10K GALLON 2027 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 1 293,890.00 Y 1.17) HF097 MINI VESSEL OF OPPORTUNITY (VOSS) SYSTEM 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Feb 2025 Feb 2026 1 107,100.00 Y 1.17) HF097 MINI VESSEL OF OPPORTUNITY (VOSS) SYSTEM 2026 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Mar 2026 Mar 2027 1 109,200.00 Y 1.18) HF098 - NOFI VESSEL OF OPPORTUNITY (VOSS) SYSTEM 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Feb 2025 Feb 2026 1 400,576.00 Y Item Number / Title [DODIC] 1.11) HF091 - VESSEL OF OPPORTUNITY (VOSS) SHIP ADAPTER MOUNTING KITS (4) 1.11) HF091 - VESSEL OF OPPORTUNITY (VOSS) SHIP ADAPTER MOUNTING KITS (4) 1.11) HF091 - VESSEL OF OPPORTUNITY (VOSS) SHIP ADAPTER MOUNTING KITS (4) 1.13) HF093 - LOGISTICS SUPPORT EQUIPMENT (5) O O C P-1 Line Item Number / Title: 0935 / Pollution Control Equipment LI 0935 - Pollution Control Equipment Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 10 of 21 P-1 Line #10 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date Volume 1 - 296 === page 375 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 LI 0935 - Pollution Control Equipment Navy P-1 Line Item Number / Title: 0935 / Pollution Control Equipment UNCLASSIFIED Page 11 of 21 Aggregated Items: Pollution Control Equipment P-1 Line #10 Volume 1 - 297 === page 376 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0935 / Pollution Control Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 1 / HF024 CFC-114 (R-114) AC CONVERSION MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 369.339 369.339 369.339 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Total 369.339 369.339 369.339 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Navy is currently dependent on CFC-based refrigerants for the mission-critical cooling of (1) vital electronics and weapon systems, (2) food and medical stowage, and (3) inhabited spaces aboard surface ships and submarines. To counter the immediate threat of production cessation on uninterrupted Fleet operations, DoW directed the Defense Logistics Agency to establish a stockpile of CFC-based refrigerants. The stockpile was sized to support Fleet operations until the last CFC-based systems are retired or converted to ozone-friendly refrigerants. This program procures and installs conversion kits on existing CFC R-114 Air-Conditioning (A/C) plants onboard surface ships. The inventory objective for CFC R-114 is 402 converted units. LI 0935 - Pollution Control Equipment Navy UNCLASSIFIED Page 12 of 21 P-1 Line #10 Volume 1 - 298 === page 377 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0935 / Pollution Control Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: CFC R-114 AirConditioning (A/C) plants Modification Type: AIT Prior Years Financial Plan Modification Number / Title: 1 / HF024 CFC-114 (R-114) AC CONVERSION FY 2025 FY 2026 Related RDT&E PEs: FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: HF024 CFC-114 (R-114) AC CONVERSION B Kits Recurring 1.1.1) HF024 CFC-114 (R-114) AC CONVERSION NonOrganic Subtotal: Recurring 402 / 166.253 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 166.253 - / - - / - - / - - / - - / - - / - - / - - / - - / - 402 / 166.253 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 166.253 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 - / 166.253 Modification Item 1 of 1: HF024 CFC-114 (R-114) AC CONVERSION - / 203.086 / 0.000 - / 0.000 - / 203.086 Subtotal: Installation - / 203.086 / - - / 0.000 - / 203.086 Subtotal: HF024 CFC-114 (R-114) AC CONVERSION Subtotal: Procurement, All Modification Items - / 0.000 402 / 166.253 - / - - / 166.253 402 / 166.253 Installation - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 0935 - Pollution Control Equipment Navy 369.339 0.000 0.000 0.000 0.000 UNCLASSIFIED Page 13 of 21 0.000 0.000 0.000 P-1 Line #10 0.000 0.000 0.000 369.339 Volume 1 - 299 === page 378 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0935 / Pollution Control Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / HF024 CFC-114 (R-114) AC CONVERSION MDAP/MAIS Code: Modification Item 1 of 1: HF024 CFC-114 (R-114) AC CONVERSION Manufacturer Information Manufacturer Name: YORK INTERNATIONAL Manufacturer Location: PA Administrative Leadtime (in Months): 2 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: AIT:: Installation Name: HF024 CFC-114 (R-114) AC CONVERSION Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 402 / 203.086 Prior Years 402 / 203.086 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 402 / 203.086 Total 402 / 203.086 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 402 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 402 Out 402 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 402 LI 0935 - Pollution Control Equipment Navy UNCLASSIFIED Page 14 of 21 P-1 Line #10 Volume 1 - 300 === page 379 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0935 / Pollution Control Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 2 / HF031 OPA IMPROVEMENTS MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 122.852 122.852 122.852 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - 16.459 9.206 8.749 0.000 8.749 7.876 15.267 19.263 19.420 - - - - - - - - - 16.459 9.206 8.749 0.000 8.749 7.876 15.267 19.263 19.420 - - - - - - - - - 16.459 9.206 8.749 0.000 8.749 7.876 15.267 19.263 19.420 Total 208.974 428.066 208.974 428.066 208.974 428.066 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: OPA Systems Improvements - Expeditionary Warfare: These installations resolve issues with existing OPA systems including poor operational availability, maintainability, and reliability. Variations in costs are subject to specific ship needs and are confirmed based upon ship checks. Shipset install/hardware buys may include: VS-50 oily water separators, secondary membrane treatment system, oil content monitor datalogger(s), multiple pumps, valves, valve actuators, sensors, switches, placards, and hoses. OPA Systems Improvements - Surface Warfare: These installations resolve issues with existing OPA systems including poor operational availability, maintainability, and reliability. Variations in costs are subject to specific ship needs and are confirmed based upon ship checks. Shipset install/hardware buys may include: oily water transfer systems, secondary membrane treatment system, oil content monitor datalogger(s), multiple pumps, valves, valve actuators, sensors, switches, placards, and hoses. [HF031 Oil Pollution Abatement (OPA) Improvements] Unit cost fluctuations for OPA improvements are attributed to the following key factors: 1. Scope of Hardware Suite Costs vary depending on whether the ship receives a full OPA system suite or select components only (e.g., Oil Content Monitors (OCMs) or Oil Water Separators (OWSs)). 2. Platform Type Installations are conducted across different ship classes, including both Expeditionary and Surface Warfare vessels, contributing to variability in integration complexity and associated costs. 3. Installation Location Costs are influenced by the geographical location of the ship's availability period. Installations within the Continental United States (CONUS) differ from those conducted Outside CONUS (OCONUS). Among CONUS shipyards, further cost variations exist between East Coast and West Coast facilities due to labor rates, logistics, and local infrastructure. 4. Technology Configuration by Hull Class Beginning in FY26, OPA upgrades for Arleigh Burke-class Destroyers (DDG Flight I, II, and IIA) incorporate centrifugal OWS technology for selected ships, while others retain legacy membrane OWS systems, resulting in cost differentials. LI 0935 - Pollution Control Equipment Navy UNCLASSIFIED Page 15 of 21 P-1 Line #10 Volume 1 - 301 === page 380 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0935 / Pollution Control Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / HF031 OPA IMPROVEMENTS MDAP/MAIS Code: Models of Systems Affected: Oil Pollution Abatement Modification Type: AIT System Prior Years Financial Plan FY 2025 FY 2026 Related RDT&E PEs: FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: HF031 OPA IMPROVEMENTS B Kits Recurring 1.1.1) HF031 Oil Pollution Abatement (OPA) Improvements - NonOrganic (6) Subtotal: Recurring Subtotal: HF031 OPA IMPROVEMENTS Subtotal: Procurement, All Modification Items 98 / 35.265 - 7 / 3.743 / 35.265 - 98 / 35.265 - / 35.265 Modification Item 1 of 1: HF031 OPA IMPROVEMENTS - / 87.587 Subtotal: Installation - / 87.587 / 3.743 7 / 3.996 - 7 / 3.743 / 3.996 - 7 / 3.996 8 / 3.426 - / - 15 / 8.992 / - - / - - / - - / 3.426 - / 2.862 - / 6.895 / 0.000 - / 5.323 - / 5.014 - / 8.372 - / 10.271 - / 10.400 / - - / 5.323 - / 5.014 - / 8.372 - / 10.271 - / 10.400 - / 3.996 - / 3.426 - / 12.716 - / 5.210 - / 5.323 - / 12.716 - / 5.210 - / 5.323 - 5 / 2.862 - / 6.895 15 / 9.020 - 8 / 3.426 / 2.862 11 / 6.895 / 3.426 - / 3.426 5 / 2.862 8 / 3.426 / 3.743 - 8 / 3.426 - 11 / 6.895 / 8.992 - 15 / 8.992 - 35 / 36.100 / 9.020 - 15 / 9.020 / 8.992 - / 36.100 35 / 36.100 / 9.020 201 / 110.299 - / 110.299 201 / 110.299 / 36.100 - / 110.299 - / 172.874 - / 317.767 - / 172.874 - / 317.767 - Installation - Total Total Cost (Procurement + Support + Installation) LI 0935 - Pollution Control Equipment Navy 122.852 16.459 9.206 8.749 0.000 UNCLASSIFIED Page 16 of 21 8.749 7.876 15.267 P-1 Line #10 19.263 19.420 208.974 428.066 Volume 1 - 302 === page 381 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0935 / Pollution Control Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / HF031 OPA IMPROVEMENTS MDAP/MAIS Code: Modification Item 1 of 1: HF031 OPA IMPROVEMENTS Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various (7) Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 5 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Oct 2024 Oct 2025 Oct 2026 Oct 2027 Oct 2028 Oct 2029 FY 2031 Delivery Dates Mar 2025 Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 Installation Information Method of Implementation: [none specified]:: Installation Name: HF031 Oil Pollution Abatement (OPA) Improvements Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - / - - / - - / - - / - - / - - / - - / - - / - - / - 83 / 92.426 98 / 180.013 7 / 12.716 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 11.337 7 / 24.053 / - - / - - / - - / - - / - - / - - / - 0 / 4.492 7 / 9.702 / - - / - - / - - / - 0 / 5.523 8 / 10.846 - / - - / - - / - 0 / 0.000 5 / 5.014 11 / 8.372 - / - - / - 0 / 0.000 11 / 8.372 - / - 0 / 0.000 15 / 10.271 0 / 0.000 15 / 10.400 Prior Years 15 / 87.587 FY 2025 - / - FY 2026 - / - - / - 7 / 5.210 - FY 2027 - / - - / - - / - 8 / 5.323 0 / 0.000 8 / 5.323 - FY 2028 - / - - / - - / - - / - - / - - / - 5 / 5.014 FY 2029 - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 15 / 87.587 7 / 12.716 7 / 5.210 8 / 5.323 0 / 0.000 8 / 5.323 5 / 5.014 15 / 10.271 11 / 8.372 15 / 10.400 - 15 / 10.271 / - 15 / 10.400 35 / 59.096 35 / 59.096 118 / 172.874 201 / 317.767 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 15 - - 4 3 - - 4 3 - - 4 4 - - 3 2 - - 6 5 - - 7 8 4 5 4 2 118 201 Out - - 5 143 201 7 8 - - 4 3 - - 4 3 - - 4 4 - - 3 2 - - 6 5 - - - - Footnotes: (6) (7) Installation costs include Design Services Allocations (DSA) and Advanced Planning (AP) efforts which are funded one and half year prior to installation. HF031 OPA Improvements Manufacturer Identification is a hardware suite and includes various part pieces and equipment procurements from multiple vendors per specific ship requirements. LI 0935 - Pollution Control Equipment Navy UNCLASSIFIED Page 17 of 21 P-1 Line #10 Volume 1 - 303 === page 382 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0935 / Pollution Control Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 3 / HF032 DRY WASTE PROCESSING SUITE IMPROVEMENTS MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 12.334 4.774 11.168 11.773 0.000 11.773 18.168 13.642 8.800 9.164 - - - - - - - - - - 12.334 4.774 11.168 11.773 0.000 11.773 18.168 13.642 8.800 9.164 - - - - - - - - - - 12.334 4.774 11.168 11.773 0.000 11.773 18.168 13.642 8.800 9.164 Total 218.686 308.509 218.686 308.509 218.686 308.509 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Dry Waste Processing Suite Improvements - Expeditionary Warfare: Funding provided to support dry waste handling equipment improvements on LHA, LHD, LPD and LSD platforms including compressed melt units, pulpers, shredders, and compactors. Dry Waste Processing Suite Improvements - Surface Warfare: Funding provided to support dry waste handling equipment improvements on CG, LCS and DDG platforms including compressed melt units, pulpers, shredders, and compactors. Dry Waste Processing Suite Improvements - Air Warfare: Funding provided to support dry waste handling equipment improvements on CVN platforms including compressed melt units, pulpers, shredders, incinerators, and compactors. [Dry Waste Processing Suite Improvements] 1. Hardware Configuration and Platform Diversity Unit cost and quantity fluctuations beginning in FY25 are driven by differing combinations of Solid Waste system modifications namely incinerators and/or Compressed Melt Unit (CMU) upgrades across a range of ship classes, including destroyers, amphibious ships, and aircraft carriers. Additional variation arises from partial or staggered system installations. LI 0935 - Pollution Control Equipment Navy UNCLASSIFIED Page 18 of 21 P-1 Line #10 Volume 1 - 304 === page 383 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0935 / Pollution Control Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Dry Waste Processing Equipment Prior Years Financial Plan Modification Number / Title: 3 / HF032 DRY WASTE PROCESSING SUITE IMPROVEMENTS Modification Type: AIT FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: HF032 DRY WASTE PROCESSING SUITE IMPROVEMENTS B Kits Recurring 1.1.1) Dry Waste Processing Suite Improvements NonOrganic (8) Subtotal: Recurring Subtotal: HF032 DRY WASTE PROCESSING SUITE IMPROVEMENTS Subtotal: Procurement, All Modification Items 10 / 10.099 / 10.099 - 6 / 0.925 - 10 / 10.099 - / 0.925 6 / 8.950 - 6 / 0.925 / 8.950 - 6 / 8.950 9 / 9.710 - / - 9 / 9.710 / 9.710 - / - 9 / 9.710 - / - - / - - / 9.710 / 0.000 - / 2.063 / - - / 2.063 / 10.099 - / 0.925 - / 8.950 - / 9.710 - / 9.710 9 / 9.710 11 / 15.297 / 15.297 - 8 / 9.039 - 11 / 15.297 / 9.039 8 / 7.247 - 8 / 9.039 / 7.247 8 / 7.505 - 8 / 7.247 / 7.505 8 / 7.505 / 15.297 - / 9.039 - / 7.247 - / 7.505 - / 2.871 - / 4.603 - / 1.553 - / 1.659 - / 2.871 - / 4.603 - / 1.553 - / 1.659 - 147 / 129.632 / 129.632 - 147 / 129.632 213 / 198.404 - / 198.404 213 / 198.404 / 129.632 - / 198.404 - / 89.054 - / 110.105 - / 89.054 - / 110.105 - Installation Modification Item 1 of 1: HF032 DRY WASTE PROCESSING SUITE IMPROVEMENTS - / 2.235 - / 3.849 - / 2.218 - / 2.063 Subtotal: Installation - / 2.235 - / 3.849 - / 2.218 - / 2.063 - Total Total Cost (Procurement + Support + Installation) LI 0935 - Pollution Control Equipment Navy 12.334 4.774 11.168 11.773 0.000 UNCLASSIFIED Page 19 of 21 11.773 18.168 13.642 P-1 Line #10 8.800 9.164 218.686 308.509 Volume 1 - 305 === page 384 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0935 / Pollution Control Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / HF032 DRY WASTE PROCESSING SUITE IMPROVEMENTS MDAP/MAIS Code: Modification Item 1 of 1: HF032 DRY WASTE PROCESSING SUITE IMPROVEMENTS Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various (9) Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 3 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Oct 2024 Oct 2025 Oct 2026 Oct 2027 Oct 2028 Oct 2029 FY 2031 Delivery Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Installation Information Method of Implementation: AIT:: Installation Name: Dry Waste Processing Suite Improvements Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 5 / 2.235 - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 3.370 10 / 5.605 FY 2025 - / - 6 / 3.849 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 1.000 6 / 4.849 FY 2026 - / - - / - 6 / 2.218 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 6 / 2.218 FY 2027 - / - - / - - / - 9 / 2.063 0 / 0.000 9 / 2.063 - / - - / - - / - - / - 0 / 0.000 9 / 2.063 FY 2028 - / - - / - - / - - / - - / - - / - 11 / 2.871 - / - - / - - / - 0 / 0.000 11 / 2.871 FY 2029 - / - - / - - / - - / - - / - - / - - / - 8 / 4.603 - / - - / - 0 / 4.640 8 / 9.243 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 8 / 1.553 - / - 0 / 0.000 8 / 1.553 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 8 / 1.659 0 / 0.000 8 / 1.659 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 147 / 80.044 147 / 80.044 Total 5 / 2.235 8 / 1.659 152 / 89.054 213 / 110.105 6 / 3.849 6 / 2.218 9 / 2.063 0 / 0.000 9 / 2.063 11 / 2.871 8 / 4.603 8 / 1.553 Installation Schedule FY 2025 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot 5 - - 4 2 - - 3 3 - - 5 4 - - 5 6 - - 5 3 - - 5 3 - 2 2 4 152 213 168 213 In Out FY 2026 - 3 2 - - 4 2 - - 3 3 - - 5 4 - - 5 6 - - 5 3 - - - - - - Footnotes: (8) Total quantity and price changed to reflect updated costs of Air Warfare procurements and installations. Hardware funding includes Production Engineering (PE) efforts. Hardware cost variances are due to specific ship requirements, location of installation, and components of Dry Waste Processing Suite Improvements e.g. incinerator replacement, solid waste shredders (plastic/metal/glass), Compress Melt Units (CMUs), and next generation of Plastic Waste Processors (PWP) to be procured and installed. LI 0935 - Pollution Control Equipment Navy UNCLASSIFIED Page 20 of 21 P-1 Line #10 Volume 1 - 306 === page 385 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0935 / Pollution Control Equipment ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / HF032 DRY WASTE PROCESSING SUITE IMPROVEMENTS MDAP/MAIS Code: (9) HF031 Dry Waste Processing Improvements Manufacturer Identification is a hardware suite and includes various part pieces and equipment procurements from mulitple vendors per specific ship requirements. LI 0935 - Pollution Control Equipment Navy UNCLASSIFIED Page 21 of 21 P-1 Line #10 Volume 1 - 307 === page 386 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 308 === page 387 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0941 / Submarine Support Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 501.582 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 501.582 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 501.582 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 278.766 278.766 278.766 383.062 383.062 383.062 330.951 - 0.000 - 330.951 - 0.000 - 330.951 0.000 330.951 330.951 330.951 313.793 313.793 313.793 159.998 159.998 159.998 142.492 142.492 142.492 To FY 2031 Complete 143.392 Continuing 143.392 Continuing Continuing 143.392 Total - Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 45.000 - 0.652 - 0.652 2.913 1.084 - - - 49.649 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This line supports modernization and obsolete equipment replacement for SSNs, recapitalization of militarily critical silencing ranges, modifications and upgrades to weapons launch equipment, upgrades & refurbishment of Submarine Special Operating Forces (SOF) equipment and Dry Deck Shelters (DDS), and the VIRGINIA class Acoustic Superiority Backfit program. Funding decreases from FY2026 to FY2027 due to completion of component procurement and production phase of the South Tongue of the Ocean Acoustic Facility (STAFAC) Recapitalization and completion of procurement of the majority of equipment for Submarine Rotational Forces West (SRF-W) Initial and Full Operational Capability in FY2026. This line funds procurement and installation of VACL Acoustic Superiority machinery modifications. The second component of the AS program, the LVA sonar, is funded under Line Item 2150. The SSN Class Component Upgrades sub-line provides for equipment technical refresh and upgrades that consist of hardware, software, system engineering, integrated logistics support, system test and evaluation, training, data, alteration installation teams and program management. The majority of these upgrades address obsolescence issues that result in unsupportable hardware or provide for improved reliability of systems that have proven to have inadequate reliability in service. The Facilities/Lab Upgrades sub-line procures equipment and material used to implement, sustain and modernize the military high priority Submarine Signature Programs. These spares procurements, technical refreshes and equipment upgrades are key to measuring submarine signatures and sustaining Fleet stealth. These ranges and measurement systems are not funded by other NAVSEA program offices. The program supports all classes of nuclear submarine (SSN/SSBN/SSGN), and associated land-based laboratories/facilities. The Weapons Handling Systems sub-line fund modifications and improvements to SSN 688, SSN 774 and SSN 21 class submarine weapons launching systems, stowage and shipping systems, torpedo tube system components and torpedo tube test equipment. These modifications are required to address reliability, maintainability, functionality and safety modifications and/or tactical improvements resulting from operational use and experience. This funding also provides management services required for installations. The VA Class SOF sub-line procures and installs unique system components required for SOF operations and support on designated SOF VIRGINIA class submarines. LI 0941 - Submarine Support Equipment Navy UNCLASSIFIED Page 1 of 18 P-1 Line #11 Volume 1 - 309 === page 388 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0941 / Submarine Support Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A AUKUS Submarine Rotational Forces West (SRF-W) sub-line procures equipment necessary for C4I Support of units and organizations in Australia. Equipment covers all necessary IT services (NIPR, SIPR, NNPI, SYLAN, SECNET, TRANET, Telephony, etc.). These systems are all essential to establishing normal operations for US units in Australia. Costs are expected to be one time procurement costs and totals are based on similar recent installations. [P40A / SSTG Digital Voltage]: SSTG Digital Voltage Regulator upgrade (SHIPALT 4884K) - Upgrades SSN-774 - 779 SSTG voltage regulators. Existing SSTGs on early VIRGINIA Class submarines use analog voltage regulators, which are obsolete and unsustainable. S/A 4884K upgrades these ships to the later style Digital Voltage Regulator which is supportable. SSN 780 and later ships were delivered with the new design Digital Voltage Regulator. [P40A / Integrated Communications System (ICS) Block V ShipAlt]: Upgrades Block I-IV VIRGINIA class ICS systems to the Block V system (SHIPALT 5061K). The ICS system provides integrated interior communication and alarms functions throughout the submarine. This system is required for safe operation of the ship. The ICS system on these ships is a COTS based system designed in the mid-1990s and first installed in 2002. Much of the design is now obsolete and unsupported. ICS must be operational to meet underway requirements. This alteration addresses obsolescence of key components in the legacy systems by upgrading the entire system to the current generation Block V system. [P40A / DGIOTS Shock Modification]: Diesel Generator Independent Over Speed Trip System (DGIOTS) Shock Modification (SHIPALT 4778K) - The DGIOTS control panel on VIRGINIA Class Block I/II has obsolete components and fails to meet requirements for shock and vibration. SHIPALT 4778K provides a shock/vibration-qualified control panel using current, supportable technology. [P40A / Fwd Automatic Bus Transfer (ABT) Power Modification]: Modifies Block I/II VIRGINIA class forward ABTs to improve system capability to support critical electronic systems during a loss of power. (SHIPALT 4882K). [P40A / Manual Remote Operator (MRO) Shock Mod]: VIRGINIA class MRO Shock Modification (SHIPALT 4620K) - Accomplishes design changes on 20 MROs per ship to meet shock qualification requirement. Required on SSN 774-781; later ships received the alteration during new construction. [P40A / Circuit D Upgrade]: Funds development, procurement and installation of SHIPALT 5062K to upgrade the Circuit D system on Block I/II VIRGINIA ships to the current design Block V system. The Circuit D system supports degaussing underway and is a critical system that is obsolete in Block I/II VIRGINIA class submarines and require modernization to allow continued support. Additionally, this system requires an interface with shipboard navigation data available through the SWFTS system. Future upgrade of the VA Class SWFTS sonar/fire control systems to TI-24/APB-23 or greater involve a change of middleware from CORBA to AMPQ protocols, which requires SHIPALT development and implementation for these two systems to support continued operation with the new SWFTS communication protocol. [P40A / SSTG Reliability Upgrades]: Funds a variety of SHIPALT efforts to improve VACL SSTG reliability. [P40A / Portable Ship Control Unit Upgrades]: The portable ship control unit provides navigational information, ship status and a communication systems to bridge watchstanders during surfaced operations. Effective and reliable functionality is critical for safe operation of the submarine. Changes in navigation data protocol associated with certain combat system upgrades (SWFTS installations) require updates to the portable ship control system for continued operation. This line procures and installs updated systems to allow continued function and improve reliability. [P40A / Low Pressure Electrolyzer (LPE) Upgrade]: Procures & installs SHIPALT 5031K on selected SSN-688 class ships to replace legacy Electrolytic Oxygen Generator (EOG) system with a modern Low Pressure Electrolyzer (LPE). A reliable oxygen generation system is critical to support crew health and submarine stealth (inoperable oxygen generators are likely to greatly increase the frequency and time the ship must operate at periscope depth where she is most vulnerable to detection and collision). The LPE produces oxygen at low pressure, eliminating the need for high pressure oxygen storage which greatly improves safety and reliability as well as decreasing maintenance cost. Procurements are driven by the SSN-688 Class maintenance period schedule as replacement of the EOG with the LPE will be done during CNO availability due to the time to complete the installation. Production engineering efforts in this line support the development and qualification of modernization efforts to support long term sustainment of in service LPE systems. LI 0941 - Submarine Support Equipment Navy UNCLASSIFIED Page 2 of 18 P-1 Line #11 Volume 1 - 310 === page 389 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0941 / Submarine Support Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / Central Air Monitoring System (CAMS) Modernization]: The CAMS system is critical to allow monitoring of atmospheric conditions throughout the submarine while underway, and hence critical to crew health & safety. The existing system suffers from multiple parts that are obsolete. This line funds efforts to develop a back fit SHIPALT for all classes of submarines (SSN 774, SSN 688, SSN21, SSBN 726). Procurements beginning in FY26 to be installed during Intermediate Level Availabilities (CMAVs/TOAs). [P40A / SSN HM&E System Sustainment]: Funds development and implementation of various minor critical alterations to in-service SSN HM&E systems. This funding line differs from the PTROCS line in that it supports modernization of hardware items such as lifelines, hatch clips, pumps, etc. whereas PTROCS supports modernization driven by obsolescence of COTS based control systems. [P40A / VA Class Machinery Control System Modernization]: VIRGINIA class submarines use COTS based systems for control of the main propulsion machinery and turbine generators. Reliable operation of these systems is critical to safe underway operation of the submarine. This line procures and installs a number of alterations to mitigate obsolescence of these control systems. [P40A / Emergency Diesel Generator Reliability Upgrades]: The Emergency Diesel Generator is a critical backup system required for safe underway operation. SEAWOLF and LOS ANGLES class submarines use a Fairbanks Morse Engineering generator system which remains largely in a 1970's era configuration. This funding line develops and installs modernization solutions to improve reliability and supportability of the engines and related control systems in order to support continued operation throughout the life of the ship. [P40A / VACL Battery Management System Upgrade]: VIRGINIA Class ships (Block I-IV) use legacy Automatic Battery Management / Battery Current Management Systems (ABMS/BCMS) to monitor battery health and operating conditions. This monitoring equipment is required to safely operate the battery and thus the submarine. The existing design is 20 years old, and while a tech refresh was conducted in FY20/21, the refreshed systems will be obsolete and unsupportable well prior to the end of service life for these boats. Funding is requested to replace the legacy systems starting with VA class Block III boats with the new design Battery Management System (BMS) used on VA class Block V. [P40A / VACL Pressure Hull Castings]: Due to significant vendor issues regarding improper heat treatment of large pressure hull castings on VACL hulls, certain castings require replacement to allow continued safe operation of the submarine. This program procures replacements castings for known deficient castings in the fleet. SIB-25 study funding has been added to support casting replacement efforts. [P40A / VACL Modified Tailcone]: The modified tailcone mitigates an issue that imposes operational restrictions on VA Class SSNs. This funding line modifies existing tailcones for a more economical price than procuring new tailcones. Installation will be performed during EDSRA/DMP as part of the existing planned work package. [P40A / SWCL San Pump Upgrade]: This line procures and installs modified OHIO class sanitary pumps for SEAWOLF class ships. Original design SEAWOLF class pumps have proven unsupportable and 2 of the 3 ships in the class do not have operational pumps and instead must blow tanks with air. Blowing places operation restrictions on the ship and causes excessive wear of HPACs along with detrimental fatigue cycles on the hull/tank structure. The use of modified OHIO class pumps saves significant procurement cost and leverages existing support and repair facilities. [P40A / Periodic Tech Refresh of COTS Systems (PTROCS)]: VA Class SSNs have several COTS based. HM&E systems requiring planned modernization to allow continued supportability or operation. Modernization needs are identified based on system health and predictive modeling or, for SWFTS connected systems, as needed to maintain interface compatibility. PTROCS groups and level loads the design and development lines of these HM&E systems into one PTROCS design and development line to support more responsive ship alteration development of these systems. This line will fund proactive management of these systems, and systems previously funded under other lines, such as VACL ICS and VACL machinery control will continue to be funded under these lines. Provides funding to support design and development of modernization efforts for emerging COTS obsolescence issues. Modernization issues are driven by diminishing manufacturing sources and SWFTS technical insertion schedule. [P40A / SWCL Ship Control Systems]: SIB-25 Study funding has been added to support modernization efforts. This line funds modernization efforts for SEAWOLF class unique ship control system/Fly By Wire hardware, software and certification test systems. SEAWOLF class ship control systems/Fly By Wire have unique hardware and software systems that have multiple obsolescence issues that require mitigation to allow continued supportability of these ships. Additionally, unique test equipment required for certification of these components requires modernization to ensure continued functionality. Additional funding was added to FY25 and out to continue modernization efforts. LI 0941 - Submarine Support Equipment Navy UNCLASSIFIED Page 3 of 18 P-1 Line #11 Volume 1 - 311 === page 390 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0941 / Submarine Support Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / VA Class ICCP Upgrade Procurement]: Virginia class submarines use a COTS based Impressed Current Cathodic Protection (ICCP) system to protect against corrosion of exposed metallic components. Reliable operation of this system is critical to prevent excessive corrosion. Failure of the system to perform results in damage that requires expensive structural repairs in overhauls and has impact on the ability of the ship to meet required service life. The existing system on Block I/II ships is obsolete and unsupportable. This line procures and installs an upgrade to the current generation Block V VACL system. [P40A / MPU/SSTG Servo Valve Upgrade]: Upgrades hydraulic servo valves on Block I-IV VIRGINIA CLASS MPU and SSTG throttle valve systems to mitigate hazards documented in HAR 392-1931. Funds are to procure valves in FY25 and they will be installed via A&I when schedule supports. [P40A / VIRGINIA Class Fire Detection System Backfit]: Investigations and reviews following the USS BONHOMME RICHARD (LHD-6) fire identified a need for improvement in fire detection and notification capability onboard US Navy ships. No attack submarines currently have this capability outside of temporary systems installed during availabilities. A requirement for this capability has been added to the VIRGINIA CLASS Block VI baseline. This funding will be used in the development of a backfit ShipAlt based on the VIRGINIA CLASS Block VI system and installation on all in-service VIRGINIA CLASS submarines in the first available CNO availability. Cost is based on VIRGINIA CLASS Block VI cost estimates. [P40A / VA CL - Payload Tube Expeditionary Reload Time Improvements]: Current Multiple AUR Canister (MAC)/MAC Support Service Module (MSSM) piping configuration does not allow at sea flushing. This results in a lengthy in-port cleaning process being required to reload VIRGINIA Payload Tubes (VPTs) after launching weapons. Funding will be used to implement system modifications to support atsea HAZMAT flushing thereby increasing the speed of reloading the VPTs in port. PMS392 has life-cycle sustainment responsibly for Weapons Launch and Handling Systems, hence this modification requires PMS392 funding. [P40A / SEAWOLF Class - Bow Dome]: The SEAWOLF Class submarines sustainment strategy did not include the provisioning of replacement bow domes; therefore, no replacement bow domes for these inservice submarines are within the Navy's inventory. There are three SEAWOLF Class submarines in service, including USS JIMMY CARTER. This program would procure one SEAWOLF Class bow dome for use in the event replacement is required. Funds in FY25 are to purchase a Bow Dome which has a three plus year lead time. [P40A / VCS Obsolescence]: These lines provide additional funding for VCS Block I/II and III/IV modernization to address existing and future systems which will require modernization to address various obsolescence related issues. This provides funding to address additional modernization needs similar to those covered by Periodic Tech Refresh of COTS Systems and various other ShipAlts developed to backfit Block V/VI designs on Block I-IV submarines. [P40A / NPES Systems]: The average age of Non-Propulsion Electronic Systems (NPES) on Block I/II are more than 18 years old. Due to Obsolescence and lack of replacement parts CANNABs are having to be taken from boats in Availabilities to keep boats outside of Availabilities operational. There are multiple Sonar Systems, Combat Systems, Electronic Warfare (EW), Imaging, and Radar Systems, Ship Defense and Unmanned Systems, and Training Systems that have significant Obsolescence issue that must be addressed. This funding supports various aspects of NPES alteration development. [P40A / Mat Sup Phase out 688]: Due recent assessment of LA CL overhaul schedules and probable service life extensions has shown a need to install some systems like the Low Pressure electrolyzers (LPEs) on additional boats. This funding will support this installations. [P40A / Sup Fut VCS Blocks]: Funding will be used to upgrade systems like the Electro-Mechanical Power Conditioner and Controller (EPCC) on older classes based on New Constructions designs. [P40A / VCS Bowdome]: The initial VIRGINIA class sustainment strategy did not include the provisioning of replacement bow domes, therefore no replacement domes for in-service submarines exist in the Navy's inventory. To date, the fleet has replaced two VCS bow domes by taking them from new construction, which is no longer possible due to 2/year construction. This line provides funding to procure two VIRGINIA class bow domes in support of in-service SSN maintenance and sustainment. [P40A / VA CL NRFI Shaft Refurbishment]: During each shaft change-out availability, a recently refurbished Ready For Issue (RFI) propulsion shaft is mated up to various propulsor components in preparation for installation. Some of this work can be performed off hull and in parallel to the EDSRA timeline, while other work is being done. While RFI VA Class shafts have historically been delivered to yards just in time for installation, they have not been available in sufficient time to execute required schedules. Having RFI shafts available at the start of EDSRA would allow some schedule savings during the availability. To support this effort, spare RFI shafts are needed in inventory. As these are extremely long lead time items (more than 4 years), funding for additional new manufacture shafts would not help in the short term. There are LI 0941 - Submarine Support Equipment Navy UNCLASSIFIED Page 4 of 18 P-1 Line #11 Volume 1 - 312 === page 391 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0941 / Submarine Support Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A three (3) existing offloaded Not Ready For Issue (NRFI) shafts available for refurbishment. Funding for the refurbishment of these shafts to become RFI shafts in storage helps reduce time and schedule risk for shaft change-out availabilities. This funding is for NAVSUP to award repair contracts to NAVSEA certified submarine shaft repair vendors. Schedule saving would return the Ship back to the fleet sooner increasing the Ao for the ship. Reducing man-days is a NSS-SY effort and outsourcing the refurbishment reduces the time a ship is off line. [P40A / SWF SCS Test Equipment]: The Performance Monitoring Program (PMP) provides direct fleet support in their areas of expertise to correct CASREPS, prevent Fail to Sails, and provide 24 hour, 7 days a week support to subs and squadrons to ensure subs stay on schedule. The PMP consists of 8 PMT sites including Guam and Diego Garcia/Souda Bay detachment. Funding is required to maintain the $15.7M of test equipment operational from normal wear/repairs, and obsolescence issues. Currently, we spend $400K/year (2.55% of total inventory value) and falling behind on planned tech refresh and obsolescence. With the stand up of the Reliability (RAM) IPT, ISEAs have recommended a few new test sets to improve Ao and reduce maintenance costs. The PMP Sustainment mangers have taken the point in finding solutions to reliability issues, this funding will facilitate the reliability working group and sustainment managers in providing support to the fleet. The PMP maintains roughly 4,215 general and special purpose test equipment items at all sites. [P40A / VA CL - Drawing Updates & HME Modernization]: VA CL fast attack submarines drawings include excessive amounts of Technical Variance Documents (TVD) or Engineering Reports (ER) hanging against the drawings. They are not being revised to 'clean' drawings. A cost savings measure in New Construction resulted in continued growth in TVD hanging against drawings. This measure did not anticipate that shipyards would be adversely impacted. This has resulted in significant increase in planning costs for EDSRA and DMP work. This will incur at least $2-4B (AWP planning costs) over the life of the VA CL program. Planners and sailors are at risk and can miss critical data when reviewing drawings and TVD. This could result in a number of different issues including tagging out the wrong component, use of the wrong material or use of an incorrect maintenance procedure. $6M of HME modernization efforts had to be deferred in FY22. Funding will allow the planning yard to start updating the drawings and remove hanging paperwork against the drawings. This will reduce the existing backlog and keep it from continuing to grow. [P40A / VA CL Propulsor Material]: VA CL Propulsor material procurements in support of Availabilities. During each shaft change-out availability various propulsor components including the Aft Outer Structure (AOS), ropeguard, Forward Outer Structure (FOS) cover plates, and tailcone are removed for inspection, repair, and paint preservation prior to reinstallation. The naval shipyards identified potential EDSRA shaft-change out schedule savings if refurbishment work is performed off hull and independent of the EDSRA timeline, while new spare Ready For Issue (RFI) components are installed. To support this effort, additional spare propulsor parts are required through either production of newly manufactured units or through refurbishment of existing offloaded Not Ready For Issue (NRFI) units where available. [P40A / Acoustic Range Equipment]: Procures equipment and materials required to implement, sustain and modernize the infrastructure associated with the Submarine Acoustic Silencing Program. TYCOMs have consistently rated the conduct of noise trials as a high priority. The requirements for this program are identified in Chief of Naval Operations (CNO) Specific Operational Requirements 46-28 (assessment of ship's acoustic posture, etc.) and Naval Sea Systems Instruction (NAVSEAINST) C9073.2B (Acoustic Surveys Policy). This is the only program in place to procure equipment for the purpose of measuring, monitoring, assessing and improving the stealth and security of deployed submarines. The equipment is used for fixed/mobile range facilities, on test vessels, and at supporting laboratories. This program replaces/upgrades broken or obsolete hardware and software. This modernization ensures the readiness and capabilities of the technology/infrastructure supporting the Acoustic Measurement Facilities Improvement Program, to include the South Tongue of the Ocean Acoustic Facility (STAFAC) and Southeast Alaska Facility (SEAFAC), remain aligned with platform requirements and evolution of the threat. Specific items include hydrophones, towed arrays, ranging and tracking systems, electronics, calibrated noise sources, shore power cables, buoys, fiber optic cables, data analysis systems, workstations, data storage and retrieval, communications systems, analyzers, tape recorders, accelerometers, monitors, etc. [P40A / Underwater Electro-Magnetic (UEM) Range Equipment]: Procures equipment and materials to support the Electro-Magnetic Silencing Program for operating nuclear submarines. The requirements for magnetic silencing and surveillance are identified in Chief of Naval Operations (CNO) Instruction OPNAVINST 8950.2H. Underwater Electromagnetic Measurement System (UEMMS) equipment and supporting facilities acquire/analyze magnetic and electric field signatures to monitor, assess and reduce the detectability/susceptibility of deployed submarines and surface ships to improve stealth and ensure mission security. This program budget line provides funding to sustain and modernize underwater electro-magnetic range surveillance systems to support the measurement submarine UEM signatures and assessment of platform health/stealth. Modernizations ensure system readiness and provide technology insertions as necessary to pace the threat and changes to platform signature requirements. The systems enable the technical community to assess the electromagnetic health of the force and improve the performance of individual ship systems. Specific items include conductivity-temperature-depth (CTD) sensors, acoustic doppler current profilers (ADCPs), magnetic /electric field sensors, sensor stanchions/tubes, data acquisition equipment, buoys, cabling and ancillary materials, data analysis hardware/software, data storage/ retrieval systems, calibration sources, workstations, communications systems, analyzers, and supporting laboratory equipment. LI 0941 - Submarine Support Equipment Navy UNCLASSIFIED Page 5 of 18 P-1 Line #11 Volume 1 - 313 === page 392 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0941 / Submarine Support Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / Pacific Fleet Submerged Electro-Magnetic Range]: Funds a submerged Underwater Electromagnetic (UEM) measurement capability (range) in the Pacific Fleet Area of Responsibility, located at the Pacific Missile Range Facility (PMRF) in Hawaii. This submerged measurement capability will fill a current SUBPAC capability gap and provide signature monitoring capability similar to the system at the South Florida Ocean Measurement Facility (SFOMF) in Fort Lauderdale, FL (that supports SUBLANT and the baseline assessment of all new construction submarines). The PAC UEM range will support VIRGINIA Class stealth, and future submarine classes. [P40A / Weapon Launching Handling System]: The Submarine Torpedo Tube Support category funds in-service support and alteration procurements for all submarine Torpedo Tubes (TT), Torpedo Ejection Pumps (TEP), Internal Countermeasure Launchers (ICL), Weapons Launch Console (WLC) and Weapons Stowage and Handling Systems (WSHS). Development efforts under this item number include Engineering Change Proposals (ECP), ORDALTs, and Test Equipment and alteration material procurement to correct significant deficiencies in equipment affecting personnel safety, ship safety and system performance. Efforts also include modernization required to ensure continue supportability of COTS based systems and comparability with SWTFS system upgrades. Production engineering includes resolving Liaison Action Requests (LARs) configure/test assembly in lab prior to ship installation and in-shop engineering support of vendor testing. [P40A / Weapon Launch Console (WLC) Tech Refresh]: VIRGINIA Block I-IV weapons launch consoles face a variety of obsolescence and supportability issues. Additionally, modernization in Block III & IV ships is required to ensure continued operability with future SWFTS upgrades. The weapons launch console interfaces with SWTFS systems, and thus must support correct interface protocols and general requirements such as cybersecurity compliance but is not modernized as part of SWFTS installs. This funding line supports design, procurement, and installation of required modifications to these systems on Block I-IV ships. [P40A / Torpedo Tube Fiber Optic Interface Upgrade]: Future weapons systems and other payloads such as the MK 48 Mod 8 / Mod 9 HWT are planned to transition to a fiber optic post-launch communication system. This provides an 1,800,000x increase in bandwidth over legacy copper systems, however a new tube penetrator is required to support this interface. The new penetrator will be installed in an existing unused port in the tube to minimize installation costs, however design and procurement costs are significant due to the need to meet SUBSAFE and Level 1 requirements. This funding line will upgrade all in service SSN platforms. [P40A / Weapon Handling Systems - EPCC Tech Refresh]: VIRGINIA Block I-IV class submarine weapon handling systems use electromechanical actuators to actuate weapons cradle movement controlled by Electromechanical Power Conditioner and Controllers (EPCCs). These units are no longer produced and unsupportable. This line funds design, procurement and install of new design EPCC systems that are supportable and maximize commonality with VIRGINIA Block V submarines. [P40A / VCS Torpedo Room Fixes]: Early VCS torpedo rooms have multiple documented hazards. This line provides funding to procure and install SHIPALT 4561K on the 9 remaining Block I/II submarines that do not already have it, and accelerates procurement and installation of the Block V EPCC on Block I-IV submarines beyond what item 3.10 allowed in order to address critical obsolescence issues. [P40A / VA Class SOF Modifications]: Provides for procurement of VIRGINIA Class unique system components that will be installed during planned modernization periods. Also provides funding to perform integrated testing of these unique systems to ensure satisfactory operation with other HM&E and Combat Systems. Funds are provided for procurement of Submarine Special Operations Forces (SOF) unique system components that will be installed during planned modernization periods. Funds are also provided for installation of SOF unique system components. [P40A / Diver Oxygen Treatment System (DOTS)/Lockout Trunk]: Funds installation of Diver Oxygen Treatment System (DOTS) and certification of Lockout Trunk (LOT) on Special Operations Forces (SOF) designated submarines SSN 777 and 778 to support NAVY SOCOM requirements. Supports the planning and procurement of long-lead time materials for installation during scheduled Depot Modernization Periods (DMPs) due to length of time required to install DOTS. [P40A / Dry Deck Shelter (DDS) Modernization]: The DDS is a certified diving system that attaches to modified host submarines and provides for insertion of SOF forces and platforms. The Department of the Navy has MOA cost share agreements with the United States Special Operations Command (USSOCOM) to support the modernization of DDS units in order to accommodate current and future Naval Special Warfare payloads, as well as large U.S. Navy payloads. Funding continues engineering design, fabrication, assembly, testing, and sparing. Changes include extending the shelter 50 inches, replacing the Track and Cradle assembly with a higher capacity and remotely operated Payload-Launch and Recovery System (P-LARS), incorporation of remote controls for all DDS functions, and relocation of equipment inside the DDS hangar to accommodate Navy and USSOCOM payloads such as SWCS/MK-11 SDV. DDS modernization is currently a 68/32 cost share between SOCOM and the Department of the Navy. LI 0941 - Submarine Support Equipment Navy UNCLASSIFIED Page 6 of 18 P-1 Line #11 Volume 1 - 314 === page 393 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0941 / Submarine Support Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / A SOCOM Project Integration into VACL Block I-III]: Support for in service VA Class SOF capabilities. Starting in FY25, this PB009 sub-line includes funding to modify (2) additional VACL Block I-III submarines in order to integrate and host a SOCOM Project. [P40A / Submarine Rotational Forces - West]: AUKUS Submarine Rotational Forces West (SRF-W) sub-line procures equipment necessary for the support of units and organizations in Australia. Equipment covers all necessary IT services (NIPR, SIPR, NNPI, SYLAN, SECNET, TRANET, Telephony, etc.), as well as ordnance handling equipment. These systems are all essential to establishing normal operations for US units in Australia. Costs are expected to be one time procurement costs and totals are based on similar recent installations. LI 0941 - Submarine Support Equipment Navy UNCLASSIFIED Page 7 of 18 P-1 Line #11 Volume 1 - 315 === page 394 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0941 / Submarine Support Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Submarine Support Equipment - / 477.796 P-3a 1 / PB002 Acoustic Superiority Machinery Alterations (TBD) - / 23.786 P-40 Total Gross/Weapon System Cost - / 501.582 Exhibits Schedule Exhibit Type Title* P-40a Submarine Support Equipment P-3a 1 / PB002 Acoustic Superiority Machinery Alterations (TBD) P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code - / 273.052 - - / 5.714 - / 278.766 / 377.233 - - / 5.829 - / 383.062 / 326.851 - - - / - / 4.100 - / 0.000 / 330.951 - / 0.000 - / 326.851 - / 4.100 - / 330.951 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 0.000 / 313.793 - / - - / 0.000 / 159.998 - / - - / 0.000 / 142.492 - / - - / - / 0.000 - / 0.000 / 143.392 Continuing - / / 39.429 Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Funding decreases from FY2026 to FY2027 due to completion of component procurement and production phase of the South Tongue of the Ocean Acoustic Facility (STAFAC) Recapitalization and completion of procurement of the majority of equipment for Submarine Rotational Forces West (SRF-W) Initial and Full Operational Capability in FY2026. LI 0941 - Submarine Support Equipment Navy UNCLASSIFIED Page 8 of 18 P-1 Line #11 Volume 1 - 316 === page 395 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0941 / Submarine Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Submarine Support Equipment FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) PB002/PB5IN SSN Class Component Upgrades 1.1) SSTG Digital Voltage Procurement A 1.2) SSTG Digital Voltage Installation A 1.3) ICS Block 5 Design Change A (1) Procurement (2) 1.4) ICS Block 5 Design Change Installation A 1.5) DGIOTS Shock Modification A Procurement (3) 1.6) DGIOTS Shock Modification Installation A 1.7) Fwd Automatic Bus Transfer Pwr Mod A Procurement (4) 1.8) Fwd Automatic Bus Transfer Pwr Mod Installation A 1.9) MRO Shock Mod A Procurement (5) 1.10) MRO Shock Mod Installation A 1.11) VACL Circuit D Upgrade Procurement A 1.12) VACL Circuit D Upgrade Installation A 1.13) SSTG Reliability Upgrades Design & A (6) Dev. (7) 1.14) SSTG Reliability Upgrades Procurement A 1.15) SSTG Reliability Upgrades Installations A 1.16) Portable Ship Control Unit A Installation (8) - - 16.337 - - - - - - - - - - - - - - - - - 2.655 - - 0.574 - - - - - - - - - - - - - - 22.524 - - 2.872 - - 2.929 - - - - - - - - - - - 11.017 - - 3.597 - - 3.668 - - 3.090 - - - - - 3.090 - - 2.211 - - - - - - - - - - - - - - - - - 1.473 - - - - - - - - - - - - - - - - - 3.805 - - 0.450 - - - - - - - - - - - - - - 15.221 - - 1.801 - - - - - - - - - - - - - - 3.079 - - 0.473 - - - - - - - - - - - - - - 0.697 - - 0.124 - - 0.126 - - - - - - - - - - - 7.569 - - 1.351 - - 2.757 - - - - - - - - - - - 0.312 - - 0.566 - - 1.546 - - 1.430 - - - - - 1.430 - - 4.802 - - 0.158 - - - - - - - - - - - - - - 8.978 - - - - - 2.381 - - - - - - - - - - - 2.623 - - 5.308 - - - - - 2.420 - - - - - 2.420 - - 3.749 - - 0.952 - - 1.378 - - - - - - - - - LI 0941 - Submarine Support Equipment Navy UNCLASSIFIED Page 9 of 18 P-1 Line #11 Volume 1 - 317 === page 396 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0941 / Submarine Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 1.17) High Pressure Air Dryer Design Development A 1.18) High Pressure Air Dryer Procurement (Fleet Install) A 1.19) Dry Deck Shelter A 1.20) VA Class Acoustic Superiority Prog Design & Dev./ Tech Transfer A 1.21) LPE Material A Procurement (9) 1.22) LPE Installation 688 Class A 1.23) LPE Production A Engineering (10) 1.24) Central Air Monitoring System (CAMS) Modernization MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Submarine Support Equipment FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - - 1.265 - - - - - - - - - - - - - - - - - 3.815 - - - - - - - - - - - - - - - - - 9.366 - - - - - - - - - - - - - - - - - 15.389 - - - - - - - - - - - - - - - - - 4.021 - - 2.092 - - 2.133 - - 2.176 - - - - - 2.176 - - 1.117 - - - - - 0.586 - - 0.597 - - - - - 0.597 - - 1.188 - - - - - 0.168 - - 0.168 - - - - - 0.168 - - 5.936 - - - - - 0.379 - - 0.386 - - - - - 0.386 - - 6.620 - - - - - 3.014 - - 0.850 - - - - - 0.850 - - 21.167 - - - - - 4.337 - - - - - - - - - - - 4.722 - - 1.107 - - 5.757 - - 3.179 - - - - - 3.179 - - 6.692 - - 4.084 - - 4.955 - - - - - - - - - - - 17.019 - - 9.000 - - 9.000 - - 10.000 - - - - - 10.000 - - 1.050 - - - - - - - - - - - - - - - - - 3.030 - - - - - - - - - - - - - - - - - 6.680 - - - - - 2.757 - - - - - - - - - A (11) 1.25) SSN HM&E System Sustainment A 1.26) VA Class Machinery Control System Modernization A 1.27) Emergency Diesel Generator Reliability Upgrades A 1.28) VACL Battery Management System A (12) (13) (14) Upgrade (15) 1.29) VACL Pressure Hull Castings (16) 1.30) VACL Modified Tailcone (17) 1.31) SWCL San Pump Upgrade (18) 1.32) Periodic Tech Refresh of COTS A A A A LI 0941 - Submarine Support Equipment Navy UNCLASSIFIED Page 10 of 18 P-1 Line #11 Volume 1 - 318 === page 397 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0941 / Submarine Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] Systems (PTROCS) ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Submarine Support Equipment FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) (19) 1.33) VACL Propulsion Shaft Procurement A 1.34) SWCL Ship Control System A Sustainment (20) 1.35) VACL ICCP Upgrade Procurement A 1.36) VACL ICCP Upgrade Install A 1.37) VCS MPU/ SSTG Servo Valve A (21) Upgrade (SIB-25) (22) 1.38) SSN Fire Detection System (SIB-25) (23) 1.39) Payload Tube Expeditionary Reload Time Improvements (SIB-25) A A 1.41) BLK I/II Obs A (26) 1.42) BLK III/IV Obs (27) A 1.43) NPES (SIB-25) A 1.44) Mat. Sup. Phase A (28) out 688 (29) 1.45) Sup. Fut. VCS Blocks 5.900 - - - - - - - - - - - - - - - - - 8.770 - - 2.790 - - 0.959 - - - - - - - - - - - - - - - - - 5.100 - - 2.470 - - - - - 2.470 - - - - - - - - 3.520 - - 1.665 - - - - - 1.665 - - 7.000 - - 7.000 - - - - - - - - - - - - - - 4.000 - - 9.000 - - 17.000 - - 33.000 - - - - - 33.000 - - - - - 1.000 - - 1.000 - - 2.000 - - - - - 2.000 - - 31.000 - - 26.000 - - - - - - - - - - - - - - 9.000 - - 3.150 - - 0.450 - - - - - - - - - - - 10.000 - - 94.742 - - 87.600 - - 105.702 - - - - - 105.702 - - 12.000 - - 9.000 - - 10.000 - - 13.000 - - - - - 13.000 - - - - - 17.000 - - 22.000 - - 22.000 - - - - - 22.000 - - - - - 17.000 - - 17.510 - - 13.450 - - - - - 13.450 - - - - - - - - - - - 29.000 - - - - - 29.000 - - - - - - - - 17.000 - - 17.034 - - - - - 17.034 (24) (25) (SIB-25) - A 1.40) SWCL Bowdome (SIB-25) (SIB-25) - (30) A 1.46) VCS Bowdome A 1.47) SSN CL Spectroscopic Total A (31) Air Monitor (32) LI 0941 - Submarine Support Equipment Navy UNCLASSIFIED Page 11 of 18 P-1 Line #11 Volume 1 - 319 === page 398 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0941 / Submarine Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 1.48) VA CL - NRFI Shaft Refurbishment A 1.49) SWF SCS Test A MAIS Code Unit Cost (33) Equipment (34) 1.50) VA CL - Drawing Updates & HME Modernization (35) 1.51) VA CL Propulsor Material A (36) A Subtotal: 1) PB002/PB5IN SSN Class Component Upgrades ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Submarine Support Equipment FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - - 7.000 - - - - - - - - - - - - - - - - - 3.000 - - - - - - - - - - - - - - - - - 3.200 - - - - - - - - - - - - - - - - - - - - - - - - - - 9.607 - - - - - 9.607 - - 316.999 - - 221.191 - - 230.010 - - 273.224 - - - - - 273.224 - - 113.760 - - 17.698 - - 62.514 - - 7.827 - - - - - 7.827 - - - - - 3.350 - - 2.348 - - 1.945 - - - - - 1.945 - - 1.296 - - 1.883 - - 11.963 - - 9.099 - - - - - 9.099 - - 115.056 - - 22.931 - - 76.825 - - 18.871 - - - - - 18.871 - - 1.000 - - 0.306 - - 0.312 - - 0.318 - - - - - 0.318 - - 0.258 - - 0.068 - - 0.069 - - 0.071 - - - - - 0.071 - - 5.216 - - 0.984 - - 0.704 - - 0.717 - - - - - 0.717 - - 0.668 - - 0.173 - - 0.176 - - 0.180 - - - - - 0.180 - - 0.540 - - 0.142 - - 0.145 - - 0.148 - - - - - 0.148 - - 0.450 - - 0.153 - - 0.156 - - - - - - - - - - - 3.115 - - 0.818 - - 0.834 - - - - - - - - - - - 7.820 - - 2.240 - - 4.119 - - 4.001 - - - - - 4.001 2) PB004/PB5IN Facilities/Lab Upgrades 2.1) Acoustic Range Equipment Replacement (37) 2.2) Underwater Electromagnetic Range Equipment Replacement A A (38) 2.3) Pacific Fleet Submerged ElectroMagnetic Range A (39) Subtotal: 2) PB004/PB5IN Facilities/ Lab Upgrades 3) PB005/PB5IN Weapon Launching Handling System 3.1) Production Engineering (40) A 3.2) 2S Cog Material A 3.3) TT/TEP/ICL/ WSHS/WLC A 3.4) Misc. Test Equipment A 3.5) Test Facility Equipment A 3.6) ORDALT Procurement A 3.7) ORDALT Installation A 3.8) Weapons Launch Console (WLC) Tech A Refresh (41) LI 0941 - Submarine Support Equipment Navy UNCLASSIFIED Page 12 of 18 P-1 Line #11 Volume 1 - 320 === page 399 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0941 / Submarine Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 3.9) Torpedo Tube Fiber Optic Interface A MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Submarine Support Equipment FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - - - - - 0.970 - - 1.589 - - 1.400 - - - - - 1.400 - - 4.746 - - 2.739 - - 3.315 - - 3.200 - - - - - 3.200 - - 2.020 - - - - - - - - - - - - - - - - - 0.783 - - - - - - - - - - - - - - - - - - - - 14.000 - - 12.000 - - 14.000 - - - - - 14.000 - - 26.616 - - 22.593 - - 23.419 - - 24.035 - - - - - 24.035 - - 3.367 - - 0.977 - - 0.997 - - 1.016 - - - - - 1.016 - - 10.934 - - - - - - - - - - - - - - - - - 4.824 - - 3.660 - - 2.736 - - - - - - - - - - - - - - 1.700 - - 6.900 - - 7.042 - - - - - 7.042 - - 19.125 - - 6.337 - - 10.633 - - 8.058 - - - - - 8.058 - - - - - - - - 36.346 - - 2.663 - - - - - 2.663 Subtotal: 5) PB010 AUKUS - - 0.000 - - - - - 36.346 - - 2.663 - - - - - 2.663 Total - - 477.796 - - - - 377.233 - - 326.851 - - - - - 326.851 Upgrade (42) 3.10) Weapons Handling SystemsEPCC Tech Refresh A 3.11) Torpedo Tube A (43) OPROD Upgrade (44) 3.12) SSTG MOD 25 Installation/DSA A 3.13) VCS Torpedo Room Fixes (SIB-25) A (45) Subtotal: 3) PB005/PB5IN Weapon Launching Handling System 4) PB009/PB5IN VA Class SOF 4.1) SOF Upgrades & Alterations (46) 4.2) Install Diver Oxygen Treatment System/Lockout Trunk on SSN 777 & 778 4.3) Dry Deck Shelters Modernization A (47) A (48) 4.4) A SOCOM Project integration into VACL BLK I-III A A (49) Subtotal: 4) PB009/PB5IN VA Class SOF 5) PB010 AUKUS 5.1) Submarine Rotational Forces West (50) A 273.052 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (1) (2) 1.1 & 1.2 SSTG Digital Voltage Regulator program upgrades a total of 6 ships. 1.3 & 1.4 ICS Block 5 Upgrade: Procures and installs S/A 5061K on all VACL block I-IV hulls. Funding profile varies to align with CNO availability schedules. 2 year procurement lead time. LI 0941 - Submarine Support Equipment Navy UNCLASSIFIED Page 13 of 18 P-1 Line #11 Volume 1 - 321 === page 400 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 (3) (4) (5) (6) (7) P-1 Line Item Number / Title: 0941 / Submarine Support Equipment Aggregated Items Title: Submarine Support Equipment 1.5 & 1.6 DGIOTS Shock Modification ShipAlt 4776K: Procurement and installation occurs in the same year (less than 12-month lead time). 1.7 & 1.8 Forward Automatic Bus Transfer Power Mod: Procurement and installation occurs in the same year (less than 12 months lead time). 1.9 & 1.10 MRO Shock Mod ShipAlt 4620K funding plan is to procure and install a total of 8 units. 1.11 & 1.12 ShipAlt 5062K Circuit D/Cathodic Protection Sys OER: Funds procurement and installation of alteration to upgrade legacy VACL systems to supportable blk V system. 1.13, 1.14 & 1.15 SSTG Reliability Upgrades: Funds modifications required to improve reliability of VACL SSTGs. Install and procurement funding varies from year to year based on differences in quantities as needed to align with maintenance availabilities. (8) (9) 1.16 Portable Ship Control Units: Installs upgrades portable ship control system to allow continued operation with updated combat systems suite. 1.21 & 1.22 Low-pressure Electrolyzer (LPE) funding transferred from BLI 0990. Procurements have an 18 month lead time. Program funding procures and installs a total of 7 units scheduled to coincide with 688 class refueling overhauls. (10) (11) (12) 1.23 LPE Production Engineering - Funds efforts that support sustainability of LPE units on in-service SEAWOLF & VIRGINIA class submarines. 1.24 Central Atmosphere Monitoring System (CAMS) Modernization - Funds efforts to develop, qualify and implement modernization solutions that allow sustainment of the CAMS system until a replacement system is available. 1.25 SSN HM&E System Sustainment - Funds development and implementation of various minor critical alterations to in-service SSN HM&E systems. This funding line differs from the PTROCS line in that is support modernization of hardware items such as lifelines, hatch clips, pumps, etc. whereas PTROCS support modernization driven by obsolescence of COTS based control systems. (13) (14) (15) (16) (17) (18) (19) (20) (21) 1.26 VA Class Machinery Control System Modernization - Procures and installs various ShipAlts to update obsolete COTS based machinery control systems to supportable modern systems. 1.27 Emergency Diesel Generator Reliability Upgrades - Funds procurement and installation of various alterations required to support sustainment and reliable operation of SSN Emergency Diesel Generators. 1.28 VACL Battery Management System Upgrade - Funding is requested to replace the legacy systems starting with VA class block III boats with the new design Battery Management System (BMS) used on VA class block V. 1.29 VACL Pressure Hull Castings - Funds replacement of hull castings identified to have significant defects resulting from improper vendor heat treatment of these large castings. 1.30 VACL Modified Tailcone - Modified tailcone, mitigates vulnerability that imposes operational restriction on VA Class SSNs. 1.31 SWCL San Pump Upgrade - Procures and installs modified OHIO class sanitary pumps on SEAWOLF class submarines to eliminate the requirement to blow tanks overboard with high pressure air. 1.32 Periodic Tech Refresh of COTS Systems (PTROCS) - Provides funding to support design and development of modernization efforts for emerging COTS obsolescence issues. 1.34 SWCL Ship Control System Sustainment - Funds modernization efforts for SEAWOLF class unique ship control system hardware, software and test systems. 1.35 & 1.36 VACL ICCP Upgrades - Procures and installs alteration to replace obsolete VACL Blk I/II ICCP system to Blk V baseline. Procurements start in FY25 with procurement and installation quantity varying as needed to align with maintenance availabilities. (22) 1.37 VCS MPU/SSTG Servo Valve Upgrade (SIB-25) - Procures and installs alteration to replace VACL servo valve upgrades as part of a reliability concern in the legacy design. Procurements start in FY25 with procurement and installation quantity varying as needed to align with maintenance availabilities. (23) 1.38 SSN Fire Detection System (SIB-25) - Provides funding to support design and development of the BLK V efforts to ensure safety of the Payload that is installed on VACL submarines. The increase in funding for the VIRGINIA Class Fire Detection System Backfit is a result of transitioning from design and development and first-time procurement to follow-on procurement and installation. (24) (25) (26) 1.39 Payload Tube Expeditionary Reload Time Improvements (SIB-25) - Funding will be used to implement system modifications to support at-sea HAZMAT flushing thereby increasing the speed of reloading the VPTs in port. 1.40 SWCL Bowdome (SIB-25) - Provides funding to procure the replacement Dome for SSN 21 Class which is showing signs of wear and deterioration. 1.41 BLK I/II Obs (SIB-25) - Procures and installs alteration to replace obsolete VACL Blk I/II systems to Blk V baseline. Procurements start in FY25 with procurement and installation quantity varying as needed to align with maintenance availabilities. (27) 1.42 BLK III/IV Obs (SIB-25) - Procures and installs alteration to replace obsolete VACL Blk III/IV systems to Blk V baseline. Procurements start in FY25 with procurement and installation quantity varying as needed to align with maintenance availabilities. (28) (29) (30) 1.43 NPES (SIB-25) - This funding supports various aspects of NPES alteration development for Blk I/II systems. 1.44 Mat. Sup. Phase out 688 - Provides funding to harvest parts from Deactivation ships to ensure that the refuelers are fully supported with the material needed to reach the new service life. 1.45 Sup. Fut. VCS Blocks - Provides funding to support the in-service VACL BLK of ships that are under design changes reviews in future BLK designs to allow for development of back-fits to ensure sustainment through strategic upgrades is achieved. (31) (32) 1.46 VCS Bowdome - Provides funding to procure and store Spare ready for issue Bow Domes for VACL. These are needed to ensure submarine sustainment through the life cycle. 1.47 SSN CL - Spectroscopic Total Air Monitor (STAM) - Funds development, qualification, procurement, and installation of the STAM system. This system replaces the legacy CAMS system on multiple SSN classes, which suffers reliability, maintainability, and procurement issues due to system age. (33) (34) 1.48 - VA CL - NRFI Shaft Refurbishment - Funds will refurbish 3 NRFI shafts. 1.49 - SWF SCS Test Equipment - The program supports the procurement of new test equipment in support of the Performance Monitoring Program (PMP). LI 0941 - Submarine Support Equipment Navy UNCLASSIFIED Page 14 of 18 P-1 Line #11 Volume 1 - 322 === page 401 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 (35) (36) (37) P-1 Line Item Number / Title: 0941 / Submarine Support Equipment Aggregated Items Title: Submarine Support Equipment 1.50 - VA CL - Drawing Updates & HME Modernization - The program will start updating the drawings and remove hanging paperwork against the drawings. 1.51 - VA CL Propulsor Material: VA CL Propulsor material procurements in support of availabilities. Funding varies based on availability schedules. 2.1 Acoustic Range - The South Tongue of the Ocean Acoustic Facility (STAFAC) facility reached end of design life in 2023 and the replacement range must be upgraded with additional sensor and processing capability in order to validate COLUMBIA (CLB) Class CDD stealth requirements. In FY27, the STAFAC Recapitalization OPN budget decreases as it completes the component procurement and production phase and the project transitions into component/ system level integration testing and preparation for system deployment. Additionally, the Southeast Alaska Facility (SEAFAC) acoustic measurement range requires investment in the modernization of major components in order to extend the design life of the range into the mid-2030s. In FY27, the program continues modernization of submerged electronics and tracking systems within the SEAFAC range to mitigate obsolescence and extend range operational service life. (38) 2.2 Underwater Electromagnetic Range Equipment - Program continues periodic spares procurement and component modernization of the South Florida Ocean Measurement Facility (SFOMF) in Dania Beach FL to counter obsolescence and insert improved capability to measure the underwater electromagnetic signatures of VA Class submarines. SFOMF supports UEM trials for all new construction and in-service east coast VA Class to ensure platforms meet the requirements for magnetic silencing and surveillance, as identified in CNO Instruction OPNAVINST 8950.2H, monitor UEM stealth and assess the performance of advanced degaussing and impressed current cathodic protection systems. (39) 2.3 Pacific Fleet Submerged Electro-Magnetic Range - This effort, which started in FY24, funds the design and installation of the Pacific Fleet Submerged Underwater Electro-Magnetic Range, a submerged measurement capability for the Pacific Fleet Area of Responsibility, located at the Pacific Missile Range Facility (PMRF) in Hawaii. This facility fills a current SUBPAC capability gap and will be similar to the system currently at the South Florida Ocean Measurement Facility (SFOMF) in Fort Lauderdale, FL in support of VIRGINIA Class and future submarine classes. PACDERMA budget decreases from FY26 to FY27 as project transitions from major range equipment procurement (seabed cables & sensor equipment), horizontal directional drilling, deep water survey for maritime construction to a phase of seabed and terrestrial cable installations, civil works, remote operations center equipment install, and system checks in support of planned IOC in late FY27. (40) (41) 3.1 - 3.7 Sub Weapons Launch/ Handling Support funds several projects that support the modernization of the Submarine Weapons Launch/ Handling Support equipment and systems. 3.8 Weapons Launch Console (WLC) Tech Refresh - Funds design, procurement and installation of modification to Virginia block I-IV weapons launch consoles to mitigate obsolete components and ensure interoperability with future SWFTS upgrades. Installation is planned to align with TI-24 SFWTS upgrades. (42) (43) 3.9 Torpedo tube fiber optic interface upgrade - Procures and installs new torpedo tube penetrators to support new weapons and other payloads using optical communication systems. 3.10 Weapons Handling Systems-EPCC Tech Refresh - Funds design, procurement and install of new design weapons handling electromechanical power conditioner and control (EPCC) systems for VIRGINIA block I-IV ships that are supportable and maximize commonality with VIRGINIA block V submarines. (44) (45) (46) 3.11 Torpedo Tube OPROD Upgrade - This line procures and installs upgraded OPRODs that increase fatigue life to exceed the service life of the ship. 3.13 VCS Torpedo Room Fixes (SIB-25) - Fund will implement Shipalts to address multiple documented hazards on VIRGINIA Class. 4.1 SOF Upgrades and Alterations - Funding is for SOF designated VACL submarine investments for modernization and product improvements required to achieve and maintain the SOF operational availability and presence requirements. Additional funding addresses component or equipment performance deficiencies, obsolescence issues, and DMSMS for the SOF VACL HOSUBs. Requirement per OPNAV N97 Ltr. SerN87/10U160461 (Subj: Submarine Requirements to Support SOF Delivery from SSGN and SSN). (47) 4.2 Install Diver Oxygen Treatment System/Lockout Trunk on SSN 777 & 778 - Funds installation of Diver Oxygen Treatment System (DOTS) and certification of Lockout Trunk (LOT) on Special Operations Forces (SOF) designated submarines SSN777 and 778 to support NAVY-SOCOM requirements. Requirement per OPNAV N97 Letter Ser N87/10U160461, Submarine Requirements to Support SOF Delivery from SSGN and SSN. (48) 4.3 Dry Deck Shelters Modernization - Funding to continue modernization and sparing of the Dry Deck Shelters based on MOA between OPNAV N97, USSOCOM, COMNAVSPECWARCOM, and NAVSEA dated 4 June 2019 which promotes an agreement to continue the cost share agreement between the Undersea Enterprise and SOCOM. (49) (50) 4.4 A SOCOM Project integration into VACL BLK I-III - Starting in FY25, modify (2) additional VACL BLK I-III submarines in order to integrate and host a SOCOM Project. 5.1 Submarine Rotational Forces West - The AUKUS Submarine Rotational Forces West (SRF-W) sub-line procures equipment necessary for the support of units and organizations in Australia. Costs are expected to be one time procurement costs. The decrease from $36.3M in FY26 to $2.9M in FY27 is due to the majority of necessary equipment being procured in FY26, in order to meet SRF-W Initial and Full Operational Capability milestones. LI 0941 - Submarine Support Equipment Navy UNCLASSIFIED Page 15 of 18 P-1 Line #11 Volume 1 - 323 === page 402 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0941 / Submarine Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - - 23.786 5.714 5.829 4.100 0.000 4.100 0.000 0.000 0.000 0.000 0.000 39.429 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) To FY 2031 Complete Total - - - - - - - - - - - - 23.786 5.714 5.829 4.100 0.000 4.100 0.000 0.000 0.000 0.000 0.000 39.429 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / PB002 Acoustic Superiority Machinery Alterations - - - - - - - - - - - - 23.786 5.714 5.829 4.100 0.000 4.100 0.000 0.000 0.000 0.000 0.000 39.429 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: [Acoustic Superiority Machinery Alterations] Acoustic Superiority backfit alterations are based on design and material developed for installation on USS SOUTH DAKOTA (SSN 790) as part of the South Dakota Improvement Program (SDIP) during PSA. This line funds the AS machinery modifications. The second component of the AS program, the LVA sonar, is funded under line item 2150 LI 0941 - Submarine Support Equipment Navy UNCLASSIFIED Page 16 of 18 P-1 Line #11 Volume 1 - 324 === page 403 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0941 / Submarine Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 1 / PB002 Acoustic Superiority Machinery Alterations FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: PB002 Acoustic Superiority Machinery Alterations B Kits Recurring 1.1.1) Machinery Alterations - Material - NonOrganic 4 / 2.127 Subtotal: Recurring - Subtotal: PB002 Acoustic Superiority Machinery Alterations / 2.127 1 / 0.555 4 / 2.127 Subtotal: Procurement, All Modification Items - / 2.127 - / 6.700 / 0.555 - 1 / 0.555 / 0.555 - 1 / 0.567 - / - - / - - / - - / - - / - - / - - / - / 0.567 - / - - / - - / - - / - - / - - / - - / - 1 / 0.567 - / - - / - - / - - / - - / - - / - - / - / 0.567 - / - - / - - / - - / - - / - - / - - / - / - - / - - / - - / - - / - - / - - / - - / - - - - / - 6 / 3.249 / 0.000 - - / - / 3.249 6 / 3.249 / 0.000 - / 3.249 / - - / 6.700 Support (All Modification Items) 2.1) Machinery Alterations Design & Development/LVA S/A Redesign 2.2) Machinery Alterations Installation Planning - 3 / 2.235 Subtotal: Support - / - - 1 / 0.780 - 1 / 0.796 - / - - / - - / - - / - - / - - / - - / - / 8.935 - / 0.780 - / 0.796 - / - - / - - / - - / - - / - - / - - / - - - / 0.000 / - 5 / 3.811 / 10.511 / 0.000 - / 0.000 - / 25.669 / - - / 0.000 - / 25.669 Installation Modification Item 1 of 1: PB002 Acoustic Superiority Machinery Alterations - / 12.724 - / 4.379 - / 4.466 - / 4.100 Subtotal: Installation - / 12.724 - / 4.379 - / 4.466 - / 4.100 - / 0.000 - / 4.100 / - - / 4.100 - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 0941 - Submarine Support Equipment Navy 23.786 5.714 5.829 4.100 0.000 UNCLASSIFIED Page 17 of 18 4.100 0.000 0.000 P-1 Line #11 0.000 0.000 0.000 39.429 Volume 1 - 325 === page 404 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0941 / Submarine Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / PB002 Acoustic Superiority Machinery Alterations MDAP/MAIS Code: Modification Item 1 of 1: PB002 Acoustic Superiority Machinery Alterations Manufacturer Information Manufacturer Name: Various Manufacturer Location: New MFG - Loc (51) Administrative Leadtime (in Months): 0 Production Leadtime (in Months): 0 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Oct 2024 Oct 2025 Oct 2026 Oct 2027 Oct 2028 Oct 2029 Oct 2030 Delivery Dates Oct 2025 Oct 2026 Oct 2027 Oct 2028 Oct 2029 Oct 2030 Oct 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: Machinery Alterations - Material Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 3 / 12.724 Prior Years 1 / 4.379 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 4 / 17.103 FY 2025 - / - - / - 1 / 4.466 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 4.466 FY 2026 - / - - / - - / - 1 / 4.100 0 / 0.000 1 / 4.100 - / - - / - - / - - / - 0 / 0.000 1 / 4.100 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 4.100 - / - - / - - / - - / - 0 / 0.000 Total 3 / 12.724 1 / 4.379 1 / 4.466 1 / 4.100 0 / 0.000 6 / 25.669 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 3 1 - - - 1 - - - 1 - - - - - - - - - - - - - - - - - - - - 6 Out 2 1 - - - 1 - - - 1 - - - - - - - - - - - - - - - - - - - 6 1 Footnotes: (51) AS machinery modifications consist of a number of individual shipalts which use material from various vendors LI 0941 - Submarine Support Equipment Navy UNCLASSIFIED Page 18 of 18 P-1 Line #11 Volume 1 - 326 === page 405 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0942 / Virginia Class Support Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0604558N, 0204281N Line Item MDAP/MAIS Code: 516 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 1,115.051 1,115.051 1,115.051 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 43.565 52.039 83.297 0.000 83.297 96.213 83.221 96.732 - - - - - - - - 43.565 52.039 83.297 0.000 83.297 96.213 83.221 96.732 To FY 2031 Complete 113.748 Continuing 113.748 Total - Continuing Continuing - Continuing - - - - - - - - - - 43.565 52.039 83.297 0.000 83.297 96.213 83.221 96.732 113.748 Continuing Continuing 3.263 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - 1.305 - 1.305 2.287 5.489 3.514 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The VIRGINIA Class BLI 0942 provides a wide range of materials required to operate, test, support and maintain the viability of VIRGINIA SSN774 Class Submarines. Additional details are provided below for each effort. Increases from FY 2026 to 2027 are required to support additional material ordering and continued vendor qualification activities associated with procurement of upgraded Ship Control System (SCS) hardware on all in-service platforms, which is necessary to ensure continued safe submarine operations. The Major Shore Spares component includes rotatable pool and insurance spares. Propulsor rotatable pool assets support planned maintenance during scheduled availabilities by decreasing equipment turnaround time/availability duration. Rotatable pool program equipment includes the high pressure air compressor, various pump/motor assemblies, radar mast, valves/actuators, ventilation fans and thin line towed array components and other components. The Test and Evaluation (T&E) component includes upgrading the afloat acoustic system required to conduct TECHEVAL/OPEVAL satisfactorily, efficiently, and with minimal risk of equipment failure. Conduct hardware and software development, procurement, maintenance, and operations as required to achieve and maintain the submarine acoustic signatures trials program. The resultant capabilities support the Submarine Acoustic Trials Enterprise, which includes the VIRGINIA Class Submarine test and evaluation program. VPT Platforms and Intermediate and Depot (I&D) Support Equipment funding includes Vertical Launch System (VLS) Peculiar Support Equipment (PSE) for All-Up Round Simulators (AURS)/All-Up Round (AUR) Ballast Cans necessary to conduct TECHEVAL/OPEVAL and provide ballast for ship operation. VIRGINIA Class Submarines must maintain a required Platform to Submarine ratio of 0.6 through the FYDP. The variable procurement quantities associated with these items are based on inventory required to maintain this ratio. Non-Tactical Data Processing System (NTDPS)-Nosis funding includes shipboard wireless LAN that provides a ship wide (forward of the reactor compartment) intranet (Non-classified Internet Protocol (IP) Router Network (Unclassified Enclave) (NIPRNET)) that significantly enhances the quality of the work by facilitating electronic correspondence, personnel data management, collaborative services, interactive whiteboard, multi-user chat, and access to these sites: Fleet Training Management & Planning System/Navy Training Management & Planning System (FTMPS/NTMPS), Composite Health Care System (CHCS), prescriptions, MYPAY-Defense Finance and Accounting Service (DFAS), Navy Personnel Command (NPC), Bureau of Naval Personnel (BUPERS), email, Fleet Technical Support Center, Atlantic (FTSCLANT), Submarine Maintenance Engineering, Planning and Procurement (SUBMEPP), and Navy Knowledge Online (NKO). Maintenance Planning System funds will be used to help ship programs identify, plan, and execute maintenance activities as well as improve efficiency at all levels (performed by ship's force as well as organizational/depot level) by creating a set of tools to provide a robust, distributed and comprehensive training and maintenance solution delivering dynamic content. This set of tools and the associated ship- LI 0942 - Virginia Class Support Equipment Navy UNCLASSIFIED Page 1 of 8 P-1 Line #12 Volume 1 - 327 === page 406 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0942 / Virginia Class Support Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0604558N, 0204281N Line Item MDAP/MAIS Code: 516 to-shore data environment will reduce Operations & Maintenance, Navy (OM&N) funding over time. This will be fielded as part of the Non-Tactical Data Processing System (NTDPS)-Nosis to VIRGINIA Class Submarines. Ship Control System (SCS) Technology Modernization funding supports obsolescence management of the Fly-By-Wire (FBW) SCS installed and used to maneuver in-service VIRGINIA Class fast attack submarines. This funding provides for upgrading software and hardware to incorporate necessary safety, reliability, and performance improvements. Additionally, the continuous ship upgrades necessary to maintain class viability of the earlier ships are included in this funding line. This is particularly important for Commercial Off-the-Shelf (COTS) Technology Refreshment and Technology Upgrades for Non-Propulsion Electronic Systems (NPES). The class level of modernization and capability rests on available resources. [P40A / Auxiliary Equipment]: Auxiliary equipment component includes funding for ladders and ladder storage containers for Sail Racetracks, Logistics Escape Trunk/Logistics Plug Trunk (LET/LPT) and other equipment such as I&D material, support material for VPT, and storage containers for Center Cell Access Port(CCAP)/All Up Round Volumetric Shape(AURS)/All Up Round Ballast Grade B(AURBb). [P40A / Non-Tactical Data Processing System - Nosis]: Provide software and hardware updates, software licenses and technical and logistics support to the Non-Tactical Data Processing System (NTDPS). [P40A / Ship Control System Technology Modernization]: Provides for the procurement of materials necessary to modernize VIRGINIA Class Fly-By-Wire (FBW) Ship Control System (SCS) to sustain interfaces and technology baseline with the connecting Government Furnished sub-systems contained in the Non-Propulsion Electronics System suite. LI 0942 - Virginia Class Support Equipment Navy UNCLASSIFIED Page 2 of 8 P-1 Line #12 Volume 1 - 328 === page 407 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0942 / Virginia Class Support Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0604558N, 0204281N Line Item MDAP/MAIS Code: 516 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Virginia Class Support Equipment - / 816.091 - / 35.626 - / 43.941 - / 75.037 / - - P-3a 1 / H1RC6 - Major Shore Spares (Various) - / 298.960 - / 7.939 - / 8.098 - / 8.260 - / 0.000 - / 8.260 P-40 Total Gross/Weapon System Cost / 1,115.051 - / 43.565 - / 52.039 - / 83.297 - / 0.000 - / 83.297 - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code - / 75.037 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Virginia Class Support Equipment P-3a 1 / H1RC6 - Major Shore Spares (Various) - - / 8.425 / - - / 8.594 / - - / 8.766 / - P-40 Total Gross/Weapon System Cost - / 96.213 - / 83.221 - / 96.732 - / - - / - - / - / 8.941 Continuing Continuing / 113.748 Continuing Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 provides for the continued procurement of support equipment to ensure the viability of VIRGINIA Class Submarines and continues procurement of materials necessary to modernize VIRGINIA Class Fly-By-Wire (FBW) Ship Control System (SCS) to sustain interfaces and technology baseline with the connecting Government Furnished sub-systems contained in the Non-Propulsion Electronics System suite. Increases from FY 2026 to 2027 are required to support additional material ordering and continued vendor qualification activities associated with procurement of upgraded SCS hardware on all in-service platforms, which is necessary to ensure continued safe submarine operations. All VIRGINIA Class Submarines must receive this one-time hardware upgrade to address obsolescence Fleet wide in order to remain operable, while continuing software modernization as required. Funds associated with this effort are phased to support procurement lead times based on the iterative development of hardware and software builds, and are aligned with ship maintenance availability schedules. LI 0942 - Virginia Class Support Equipment Navy UNCLASSIFIED Page 3 of 8 P-1 Line #12 Volume 1 - 329 === page 408 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0942 / Virginia Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Virginia Class Support Equipment Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) All Prior Years 1.1) All Prior Years (APY) A - - 647.750 - - - - - - - - - - - - - - - - - 647.750 - - - - - - - - - - - - - - - - - 44.480 - - 2.163 - - 2.206 - - 2.061 - - - - - 2.061 - - 44.480 - - 2.163 - - 2.206 - - 2.061 - - - - - 2.061 1,841K 12 22.092 2,028K 1 2.028 2,068K 1 2.068 2,109K 1 2.109 - - - 2,109K 1 2.109 312,642.86 14 4.377 337,400.00 1 0.337 344,000.00 1 0.344 351,000.00 1 0.351 - - - 351,000.00 1 0.351 - - 9.482 - - 4.174 - - 4.206 - - 3.942 - - - - - 3.942 - - 35.951 - - 6.539 - - 6.618 - - 6.402 - - - - - 6.402 Subtotal: 1) All Prior Years 2) H1RC2 TEST & EVALUATION EQUIPMENT 2.1) Test & Evaluation Measuring Equipment A Subtotal: 2) H1RC2 TEST & EVALUATION EQUIPMENT 3) H1RC8 - VPT and I&D Support Equipment 3.1) Weapons Equipment: VPT Platform A (1) 3.2) Industrial Equipment: Sail Racetracks A 3.3) Auxiliary A Equipment (2) Subtotal: 3) H1RC8 - VPT and I&D Support Equipment 4) H1RC13 TECH INSERTION TECH REFRESH & UPGRADES 4.1) Shipboard Mobile Computing NTDPS (ULAN + SW Enclave + PDOCS + Upgrades) A 4.2) Non-Tactical Data Processing System Nosis A 4.3) Ship Control System Technology A - - 35.523 - - 2.869 - - 2.926 - - 2.734 - - - - - 2.734 - - 35.039 - - 4.593 - - 4.685 - - 4.378 - - - - - 4.378 - - 17.348 - - 19.462 - - 27.506 - - 59.462 - - - - - 59.462 Subtotal: 4) H1RC13 TECH INSERTION TECH REFRESH & UPGRADES - - 87.910 - - 26.924 - - 35.117 - - 66.574 - - - - - 66.574 Total - - 816.091 - - 35.626 - - 43.941 - - 75.037 - - - - - 75.037 Modernization (3) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (1) (2) (3) VIRGINIA Class Submarines must maintain a required Platform to Submarine ratio of 0.6 through the FYDP. The variable procurement quantities associated with these items are based on inventory required to maintain this ratio. The variable cost for Auxiliary Equipment is based on platform configuration. Funds beginning in FY 2023 provide for the procurement of materials necessary to modernize VIRGINIA Class Fly-By-Wire (FBW) Ship Control System (SCS) to sustain interfaces and technology baseline with the connecting Government Furnished sub-systems contained in the NPES suite. Increases from FY 2026 to 2027 are required to support additional material ordering and continued vendor qualification activities associated with procurement of upgraded SCS LI 0942 - Virginia Class Support Equipment Navy UNCLASSIFIED Page 4 of 8 P-1 Line #12 Volume 1 - 330 === page 409 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0942 / Virginia Class Support Equipment Aggregated Items Title: Virginia Class Support Equipment hardware on all in-service platforms, which is necessary to ensure continued safe submarine operations. All VIRGINIA Class Submarines must receive this one-time hardware upgrade to address obsolescence Fleet wide in order to remain operable, while continuing software modernization as required. Funds associated with this effort are phased to support procurement lead times based on the iterative development of hardware and software builds, and are aligned with ship maintenance availability schedules. LI 0942 - Virginia Class Support Equipment Navy UNCLASSIFIED Page 5 of 8 P-1 Line #12 Volume 1 - 331 === page 410 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0942 / Virginia Class Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / H1RC6 - Major Shore Spares MDAP/MAIS Code: Prior Years 298.960 298.960 298.960 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 7.939 8.098 8.260 0.000 8.260 8.425 8.594 8.766 - - - - - - - - 7.939 8.098 8.260 0.000 8.260 8.425 8.594 8.766 - - - - - - - - 7.939 8.098 8.260 0.000 8.260 8.425 8.594 8.766 To FY 2031 Complete 8.941 Continuing - Continuing - 8.941 Continuing - Total - Continuing - - 8.941 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Procure equipment and materials necessary to support the VIRGINIA Class submarine program. Materials are as large as rotors and as small as anodes and fasteners. VIRGINIA Class rotatable pool rotors are removed, refurbished, and placed into a pool. There is no set installation schedule as rotors, once available, are installed on subsequent availabilities. [Propulsor - Rotatable Pool] Procure equipment and materials necessary to support the VIRGINIA Class submarine program. Materials are as large as rotors and as small as anodes and fasteners. VIRGINIA Class rotatable pool rotors are removed, refurbished, and placed into a pool. There is no set installation schedule as rotors, once available, are installed on subsequent availabilities. LI 0942 - Virginia Class Support Equipment Navy UNCLASSIFIED Page 6 of 8 P-1 Line #12 Volume 1 - 332 === page 411 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0942 / Virginia Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / H1RC6 - Major Shore Spares MDAP/MAIS Code: Models of Systems Affected: VA Class Submarine Prior Years Modification Type: Various FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: H1RC6 - Major Shore Spares B Kits Non-Recurring 1.1.1) H1RC6 Prior Years - Organic 1.1.2) Propulsor - Rotatable Pool - Organic - 1.1.3) NFPC High Speed Machine - Organic Subtotal: Non-Recurring Subtotal: H1RC6 - Major Shore Spares Subtotal: Procurement, All Modification Items / 172.620 - 12 / 85.342 (4) - / 40.998 / 298.960 - / 298.960 - - / 7.939 - / / 8.098 - 1 / 7.939 - / - 1 / 8.098 / / 7.939 - 12 / 298.960 - / - 1 / 7.939 / 8.098 - / - - - / - 1 / 8.260 - / - - / - / 8.260 - / - 1 / 8.260 - / - / 8.260 - / - / - - / - - 1 / 8.098 - / - 1 / 8.260 - - / / / 8.260 - - - / 8.260 - - / 8.425 - - / 8.594 - - / 8.766 - / - Continuing / 172.620 / - - Continuing Continuing 1 / 8.941 Continuing Continuing / 8.941 Continuing Continuing - / - - Continuing / 8.941 - 1 / 8.766 - / - 1 / 8.941 / / 8.766 - 1 / 8.594 - / - 1 / 8.766 / / 8.594 - 1 / 8.425 - / - 1 / 8.594 / / 8.425 - 1 / 8.260 - / - 1 / 8.425 - / 40.998 Installation Subtotal: Installation - / - - / - - / - - - / - - / - - / - - / - - / - - / - 8.941 Continuing - / - Total Total Cost (Procurement + Support + Installation) LI 0942 - Virginia Class Support Equipment Navy 298.960 7.939 8.098 8.260 0.000 UNCLASSIFIED Page 7 of 8 8.260 8.425 8.594 P-1 Line #12 8.766 Continuing Volume 1 - 333 === page 412 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0942 / Virginia Class Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / H1RC6 - Major Shore Spares MDAP/MAIS Code: Modification Item 1 of 1: H1RC6 - Major Shore Spares Footnotes: (4) Rotatable Pool increases slightly beyond inflation due to the material volatility of components. Further details can be provided at the appropriate classification level. LI 0942 - Virginia Class Support Equipment Navy UNCLASSIFIED Page 8 of 8 P-1 Line #12 Volume 1 - 334 === page 413 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0944 / LCS Class Support Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 113.194 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 113.194 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 113.194 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 5.855 2.551 15.815 0.000 15.815 17.251 17.311 16.671 17.000 - - - - - - - - - - - 5.855 2.551 15.815 0.000 15.815 17.251 17.311 16.671 17.000 - - - - - - - - - - - 5.855 2.551 15.815 0.000 15.815 17.251 17.311 16.671 17.000 - Total 205.648 205.648 205.648 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Littoral Combat Ship (LCS) Class Support Equipment line procures long-lead major end items and the connective equipment necessary to ensure fit and function required for repairs, and associated engineering, technical, and transportation support services for both LCS variants, Freedom and Independence. The items procured increase availability of vital Fleet assets by reducing repair part procurement and delivery times. LN001 - LCS Spares This line procures shore-based LCS Class Support Equipment (Spares), ensuring their availability in the event of a failure or major casualty to key ship systems. Spares are major end items available on an as need basis to meet Fleet requirements. Inventory objectives are determined by Reliability, Maintainability, and Availability (RM&A) data, the critical application of equipment, and input from the LCS technical community. LN002 - LCS Water Jet Spares This line procures LCS Water Jets and associated propulsion components for both LCS variants. The configurations vary between ships; there are five Water Jet configurations. Water Jet assemblies are designated as Battle Spares and support a rotatable pool for life cycle sustainment. LN003 - Engineering Services This line funds engineering, technical and transportation support for LCS Class Support Equipment. Services include the establishment of Technical Data Packages (TDPs), the creation of associated depot level repair parts lists/installation requirements, and transportation services. LN006 - LCS Ships Class Ancillary Equipment This funding procures the connective equipment necessary to ensure fit and function of procured LCS Class Support Equipment (Spares) when installed. LI 0944 - LCS Class Support Equipment Navy UNCLASSIFIED Page 1 of 5 P-1 Line #13 Volume 1 - 335 === page 414 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0944 / LCS Class Support Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a LCS Class Support Equipment P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 113.194 - / 5.855 - / 2.551 - / 15.815 - / 113.194 - / 5.855 - / 2.551 - / 15.815 - / - - / 15.815 / 0.000 - / 15.815 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Funding increase from FY 2026 to FY2027 supports LCS Insurance Spares by procuring one Independence class Main Propulsion Diesel Engine (MPDE) and two Freedom class Ship Service Diesel Generators (SSDG) critical pieces of equipment for LCS Class ships operations. Mitigation of long lead times for repairs through procurements of adequate Insurance spares using failure data allows for continued progress toward mainstreaming and normalizing LCS platform sustainment. LI 0944 - LCS Class Support Equipment Navy UNCLASSIFIED Page 2 of 5 P-1 Line #13 Volume 1 - 336 === page 415 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0944 / LCS Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: LCS Class Support Equipment FY 2027 Base Total Cost Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) LN001 LCS Battle Spares 1.1) SHIPS SERVICE DIESEL GENERATOR (INDEPENDENCE VARIANT) A 1.3) MT-30 Gas Turbine Engine Ancillary Equipment A 1.4) TWIN-BOOM EXTENSIBLE CRANE (INDEPENDENCE A VARIANT) 18.921 - - - - - - - - - - - - - - - 8,354K 1 8.354 - - - - - - - - - - - - - - - 4,161K 3 12.483 - - - - - - - - - - - - - - - 2,037K 3 6.110 - - - - - - - - - - - - - - - 450,000.00 2 0.900 - - - - - - - - - - - - - - - 13,614K 1 13.614 - - - - - - - - - - - - - - - 6,449K 1 6.449 - - - - - - - - - - - - - - - 963,000.00 6 5.778 - - - - - - 2,402K 4.804 - - - 2,402K 816,000.00 1 0.816 2,593K 5.186 - - - - - - - - - - - - 2,500K 1 2.500 - - - - - - - - - - - - - - - 15,000K 1 15.000 - - - - - - - - - - - - - - - 10,000K 1 10.000 - - - - - - - - - - - - - - - - - - - - - - 10.628 - - - A (†) 1.6) MULT. AIRCRAFT NOSE & TAILGEAR INTEGRATED SYS (INDEPENDENCE VARIANT) A 1.7) REDUCTION GEAR (FREEDOM VARIANT) A 1.8) REDUCTION GEAR (INDEPENDENCE VARIANT) A 1.9) SHIPS SERVICE DIESEL GENERATOR (FREEDOM VARIANT) A 1.12) Air Conditioning A Plant 7 (†) 1.5) SEA GIRAFFE 3D RADAR (INDEPENDENCE VARIANT) 2,703K (†) (†) 1.13) Boat Davit 6 AF A 1.14) Water Purification (Congressional Add) A 1.16) Mk-110 Gun A (†) Mount 1.17) Main Propulsion Diesel Engine (INDEPENDENCE VARIANT) 2 2 2 4.804 A - - LI 0944 - LCS Class Support Equipment Navy UNCLASSIFIED Page 3 of 5 10,628K 1 P-1 Line #13 10,628K 1 10.628 Volume 1 - 337 === page 416 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0944 / LCS Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 1.19) Boat Davits (FRE) A MAIS Code Unit Cost Subtotal: 1) LN001 LCS Battle Spares ($) Qty (Each) - - - - FY 2025 Total Cost Unit Cost ($ M) ($) - Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) - - - 2,052K 100.925 - - 5.186 - FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) 1 Aggregated Items Title: LCS Class Support Equipment ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 2.052 - - - - - - - - - - 2.052 - - 15.432 - - - - - 15.432 2) LN002 LCS 6AF Water Jet Spares 2.1) WLD 1500 Shaft Assembly A 2.2) WLD 1720 Shaft Assembly A Subtotal: 2) LN002 LCS 6AF Water Jet Spares 397,125.00 8 3.177 - - - - - - - - - - - - - - - 658,250.00 8 5.266 - - - - - - - - - - - - - - - 8.443 - - - - - - - - - - - - - - - - - 3) LN003 Engineering Services (TDPs & installation planning) 3.1) Engineering Services (TDPs & installation planning) A - - 2.367 - - 0.519 - - 0.499 - - 0.383 - - - - - 0.383 - - 2.367 - - 0.519 - - 0.499 - - 0.383 - - - - - 0.383 - - 1.459 - - 0.150 - - - - - - - - - - - - Subtotal: 4) LN006 Ancillary Equipment - - 1.459 - - 0.150 - - - - - - - - - - - - Total - - 113.194 - - 5.855 - - 2.551 - - 15.815 - - - - - 15.815 Subtotal: 3) LN003 Engineering Services (TDPs & installation planning) 4) LN006 Ancillary Equipment 4.1) Ancillary Equipment A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a LI 0944 - LCS Class Support Equipment Navy UNCLASSIFIED Page 4 of 5 P-1 Line #13 Volume 1 - 338 === page 417 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Aggregated Items: LCS Class Support Equipment FY Contractor and Location Method/Type or Funding Vehicle 1.1) SHIPS SERVICE DIESEL GENERATOR (INDEPENDENCE VARIANT) 2023 MTU / GERMANY C / TBD SUPSHIP Gulf Coast Oct 2022 Sep 2025 4 2,362K N Mar 2024 1.4) TWIN-BOOM EXTENSIBLE CRANE (INDEPENDENCE VARIANT) 2024 SUPSHIP Gulf Coast / Pascagoula, MS C / FFP NAVSEA Jul 2024 Oct 2025 1 4,644K N Jan 2025 1.5) SEA GIRAFFE 3D RADAR (INDEPENDENCE VARIANT) 2024 Saab Sensis Corporation / Reston, VA C / TBD NAVSEA Oct 2024 Jun 2028 1 2,397K N Jul 2024 1.12) Air Conditioning Plant 2025 Johnson Controls / Norman, OK C / TBD SUPSHIP Gulf Coast Aug 2025 Jan 2027 2 2,593K N Oct 2024 Jun 2025 1.16) Mk-110 Gun Mount 2024 NAVSEA / Washington, DC C / TBD NAVSEA Jul 2024 Jul 2026 1 10,000K N Jul 2024 May 2024 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 0944 / LCS Class Support Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) LN001 LCS Battle Spares LI 0944 - LCS Class Support Equipment Navy UNCLASSIFIED Page 5 of 5 P-1 Line #13 Volume 1 - 339 === page 418 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 340 === page 419 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0945 / Submarine Batteries Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 225.482 225.482 225.482 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 30.470 28.169 26.211 0.000 26.211 27.676 24.291 24.774 - - - - - - - - 30.470 28.169 26.211 0.000 26.211 27.676 24.291 24.774 - - - - - - - - 30.470 28.169 26.211 0.000 26.211 27.676 24.291 24.774 To FY 2031 Complete - Total - 25.264 Continuing - Continuing - 25.264 Continuing - Continuing - - 25.264 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This program procures replacement of Valve Regulated Lead Acid (VRLA) batteries for all classes of submarines (LOS ANGELES, SEAWOLF, OHIO SSBN/SSGNs and VIRGINIA) as well as funds and manages the production engineering efforts for the In-Service Engineering Agent (ISEA) at NSWC Crane. FY 2027 funding supports the procurement of replacement Valve Regulated Lead Acid (VRLA) batteries for LOS ANGELES (4); OHIO (5); VIRGINIA (12); and associated production engineering. Submarines utilize a Main Storage Battery that provides an immediately available source of backup power that is vital to maintaining ship and reactor plant safety. Submarines with insufficient battery capacity cannot deploy, use the reactor, or operate at-sea. Batteries have a finite life and are consumables; periodic replacements of the battery are incorporated into the maintenance plan for all submarines and are scheduled to minimize the impact to submarine force operational availability. The present geopolitical environment has necessitated Combatant Commanders placing high demands on the submarine force for strategic deterrence, force protection and especially sensitive ISR (Intelligence, Surveillance, and Reconnaissance) missions. The procurement and maintaining of submarine batteries is a pillar that keeps the fleet ready to meet operational commitments. Yearly battery procurement costs are based on fixed, per-cell costs defined by a multi-year Firm Fixed Price contract in effect from FY23-FY28. The quantity of cells required and mix of cell types varies yearly as a function of fleet requirements; consequently, overall battery procurement cost varies despite fixed baseline cell pricing. HM002, HM008, HM009, and HM010 reflect the battery procurement quantities and costs for LOS ANGELES, OHIO, SEAWOLF, and VIRGINIA class submarines respectively. Yearly procurement quantities are projected from the expected average service life of historical batteries. Funding supports procurement the average replacement requirement of 20 battery ship sets each year, though individual yearly quantity varies based on fleet operational requirements. The budget lines also procure battery installation tray sets that are required for all installed batteries. Tray sets are procured during conversion and new construction but must be removed, inspected, and reinstalled during shipboard battery replacement. Procurement of additional shipsets greatly improves battery replacement logistics, enabling schedule flexibility and quick adaption to fleet timelines. HM830 Production Engineering funds Naval Surface Warfare Center (NSWC) Crane as the Acquisition Engineering Agent (AEA) and In-Service Engineering Agent (ISEA). NSWC Crane is responsible for leading a Government & Industry Root Cause Analysis Team to identify and address battery performance issues, provide corrective actions to operational submarines regarding batteries, and conducting qualification testing of delivered VRLA batteries. NSWC Crane's analyses supports improvements to design and operating procedures aimed at increased battery life, reliability, and predictability. LI 0945 - Submarine Batteries Navy UNCLASSIFIED Page 1 of 7 P-1 Line #14 Volume 1 - 341 === page 420 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0945 / Submarine Batteries Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Funding provided to Puget Sound and Portsmouth Naval Shipyards includes responsibilities for the VRLA battery inventory management, maintenance, and storage. LI 0945 - Submarine Batteries Navy UNCLASSIFIED Page 2 of 7 P-1 Line #14 Volume 1 - 342 === page 421 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0945 / Submarine Batteries Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Equipment P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code P-5a Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 225.482 - / 30.470 - / 28.169 - / 26.211 - / 225.482 - / 30.470 - / 28.169 - / 26.211 - / - - / 26.211 / 0.000 - / 26.211 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding supports the procurement of replacement Valve Regulated Lead Acid (VRLA) batteries for LOS ANGELES (4); OHIO (5); VIRGINIA (12); and associated production engineering. Funding decreased from FY26 to FY27 due to Department balancing reductions. LI 0945 - Submarine Batteries Navy UNCLASSIFIED Page 3 of 7 P-1 Line #14 Volume 1 - 343 === page 422 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0945 / Submarine Batteries Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Equipment Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) HM002 - LOS ANGELES Class Main Storage Battery 1.1) LA VRLA Battery Storage Boosting Packaging A (1)(†) 1.2) LA Class VRLA Installation Tray (2) A 1.3) Replacement Cells A 1.4) LA Class VRLA Installation Material A 678,918.92 37 25.120 838,000.00 5 4.190 875,000.00 5 4.375 913,000.00 164,000.00 3 0.492 - - - - - - - 3 2.739 - - - 913,000.00 3 2.739 - - - - - - - - - - 0.188 - - - - - - - - - - - - - - - - - 0.671 - - - - - - - - - - - - - - - - - 26.471 - - 4.190 - - 4.375 - - 2.739 - - - - - 2.739 1,082K 33 35.719 1,310K 6.550 1,372K 5.488 1,442K 5.768 - - - 1,442K 1,349K 1 1.349 - - - - - - - - - - - - - - - 37.068 - - 6.550 - - 5.488 - - 5.768 - - - - - 5.768 0.842 - - - - - - - - - - 0.842 - - - - - - - - - 11 10.208 978,000.00 12 11.736 - - - 12 11.736 1 0.996 - - - - - - - - - Subtotal: 1) HM002 - LOS ANGELES Class Main Storage Battery 2) HM008 - OHIO Class Main Storage Battery 2.1) OH VRLA Battery Storage Boosting Packaging A (3)(†) 2.2) OH VRLA Installation Tray (4) A Subtotal: 2) HM008 - OHIO Class Main Storage Battery - - 5 4 4 4 5.768 3) HM009 - SEAWOLF Class Main Storage Battery 3.1) SW VRLA Battery Storage Boosting Packaging A (5)(†) 695,000.00 Subtotal: 3) HM009 - SEAWOLF Class Main Storage Battery - 4 2.780 794,000.00 - 2 - 1.588 842,000.00 1.588 - 1 - 2.780 746,810.81 37 27.632 880,000.00 838,000.00 4 3.352 - - - 30.984 - - 7.040 - - 11.204 - - 11.736 - - - - - 11.736 4) HM010 - VIRGINIA Class Main Storage Battery 4.1) VA VRLA Battery Storage Boosting Packaging A (6)(†) 4.2) VA VRLA Installation Tray (7)(†) A Subtotal: 4) HM010 - VIRGINIA Class Main Storage Battery - - 8 7.040 928,000.00 996,000.00 978,000.00 5) HM830 - Production Engineering / Test Equipment/ SUBEC / ABMS Tech Refresh 5.1) Production Engineering A 5.2) Battery Installation Test Equipment/Fixtures B 5.3) Submarine Battery Evaluation Center (SUBBEC) A LI 0945 - Submarine Batteries Navy - - 112.422 - - 11.102 - - 6.260 - - 5.968 - - - - - 5.968 - - 1.101 - - - - - - - - - - - - - - - - - 8.635 - - - - - - - - - - - - - - - UNCLASSIFIED Page 4 of 7 P-1 Line #14 Volume 1 - 344 === page 423 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0945 / Submarine Batteries Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 5.4) Battery Monitoring Sys (ABMS /BCMS/ BMS) A MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: Equipment FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - - 6.021 - - - - - - - - - - - - - - - Subtotal: 5) HM830 - Production Engineering / Test Equipment/ SUBEC / ABMS Tech Refresh - - 128.179 - - 11.102 - - 6.260 - - 5.968 - - - - - 5.968 Total - - 225.482 - - 30.470 - - 28.169 - - 26.211 - - - - - 26.211 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) 1.1 VRLA battery unit costs reflect the costs in the existing commercial dual vendor contract. The actual costs vary by procurement FY, class type, vendor, procurement quantity, boosting intervals, packaging and storage duration. The Battery shipset prices are based on cell quantities and there is opportunity for price reductions per battery if purchased in bulk quantities. (2) (3) (4) (5) (6) (7) 1.2 Shipping/installation trays are discrete purchases on a separate line from the battery shipsets. Shipping/installation trays are required for battery installation and provide more protection and efficiency into battery shipset logistics. 2.1 Refer to footnote 1 2.2 Refer to footnote 2 3.1 Refer to footnote 1 4.1 Refer to footnote 1 4.2 Refer to footnote 2 LI 0945 - Submarine Batteries Navy UNCLASSIFIED Page 5 of 7 P-1 Line #14 Volume 1 - 345 === page 424 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Item Number / Title [DODIC] O O C FY P-1 Line Item Number / Title: 0945 / Submarine Batteries Contractor and Location Method/Type or Funding Vehicle Aggregated Items: Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) HM002 - LOS ANGELES Class Main Storage Battery 1.1) LA VRLA Battery Storage Boosting Packaging (1) 1.1) LA VRLA Battery Storage Boosting Packaging (1) 1.1) LA VRLA Battery Storage Boosting Packaging (1) 1.1) LA VRLA Battery Storage Boosting Packaging (1) 1.1) LA VRLA Battery Storage Boosting Packaging (1) 2023 ENERSYS & GNB (Exide) / Warrensburg, MO & Ft. Smith , AR C / IDIQ NSWC CRANE Feb 2023 Feb 2024 4 765,000.00 Y 2024 ENERSYS & GNB (Exide) / Warrensburg, MO & Ft. Smith , AR C / IDIQ NSWC CRANE Feb 2024 Feb 2025 3 803,000.00 Y 2025 ENERSYS & GNB (Exide) / Warrensburg, MO & Ft. Smith , AR C / IDIQ NSWC CRANE Feb 2025 Feb 2026 5 838,000.00 Y 2026 ENERSYS & GNB (Exide) / Warrensburg, MO & Ft. Smith , AR C / TBD NSWC CRANE Feb 2026 Feb 2027 5 875,000.00 Y 2027 ENERSYS & GNB (Exide) / Warrensburg, MO & Ft. Smith , AR C / TBD NSWC CRANE Feb 2027 Feb 2028 3 913,000.00 N 2023 ENERSYS & GNB (Exide) / Warrensburg, MO & Ft. Smith, AR C / IDIQ NSWC CRANE Feb 2023 Feb 2024 3 1,186K Y 2024 ENERSYS & GNB (Exide) / Warrensburg, MO & Ft. Smith, AR C / IDIQ NSWC CRANE Feb 2024 Feb 2025 8 1,239K Y 2025 ENERSYS & GNB (Exide) / Warrensburg, MO & Ft. Smith, AR C / IDIQ NSWC CRANE Feb 2025 Feb 2026 5 1,310K Y 2026 ENERSYS & GNB (Exide) / Warrensburg, MO & Ft. Smith, AR C / TBD NSWC CRANE Feb 2026 Feb 2027 4 1,372K Y 2027 ENERSYS & GNB (Exide) / Warrensburg, MO & Ft. Smith, AR C / TBD NSWC CRANE Feb 2027 Feb 2028 4 1,442K N 2025 ENERSYS / Warrensburg, MO C / IDIQ NSWC CRANE Feb 2025 Feb 2026 2 794,000.00 Y 2026 ENERSYS / Warrensburg, MO C / TBD NSWC CRANE Feb 2026 Feb 2027 1 842,000.00 Y 2023 ENERSYS & GNB (Exide) / Warrensburg, MO & Ft. Smith, AR C / IDIQ NSWC CRANE Feb 2023 Feb 2024 9 801,900.00 Y 2024 ENERSYS & GNB (Exide) / Warrensburg, MO & Ft. Smith, AR C / IDIQ NSWC CRANE Feb 2024 Feb 2025 8 834,000.00 Y 2025 ENERSYS & GNB (Exide) / Warrensburg, MO & Ft. Smith, AR C / IDIQ NSWC CRANE Feb 2025 Feb 2026 8 880,000.00 Y 2) HM008 - OHIO Class Main Storage Battery 2.1) OH VRLA Battery Storage Boosting Packaging (3) 2.1) OH VRLA Battery Storage Boosting Packaging (3) 2.1) OH VRLA Battery Storage Boosting Packaging (3) 2.1) OH VRLA Battery Storage Boosting Packaging (3) 2.1) OH VRLA Battery Storage Boosting Packaging (3) 3) HM009 - SEAWOLF Class Main Storage Battery 3.1) SW VRLA Battery Storage Boosting Packaging (5) 3.1) SW VRLA Battery Storage Boosting Packaging (5) 4) HM010 - VIRGINIA Class Main Storage Battery 4.1) VA VRLA Battery Storage Boosting Packaging (6) 4.1) VA VRLA Battery Storage Boosting Packaging (6) 4.1) VA VRLA Battery Storage Boosting Packaging (6) LI 0945 - Submarine Batteries Navy UNCLASSIFIED Page 6 of 7 P-1 Line #14 Volume 1 - 346 === page 425 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Item Number / Title [DODIC] O O C 4.1) VA VRLA Battery Storage Boosting Packaging (6) 4.1) VA VRLA Battery Storage Boosting Packaging (6) 4.2) VA VRLA Installation Tray (7) 4.2) VA VRLA Installation Tray (7) LI 0945 - Submarine Batteries Navy P-1 Line Item Number / Title: 0945 / Submarine Batteries Method/Type or Funding Vehicle Aggregated Items: Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2026 ENERSYS & GNB (Exide) / Warrensburg, MO & Ft. Smith, AR C / TBD NSWC CRANE Feb 2026 Feb 2027 11 928,000.00 Y 2027 ENERSYS & GNB (Exide) / Warrensburg, MO & Ft. Smith, AR C / TBD NSWC CRANE Feb 2027 Feb 2028 12 978,000.00 N 2024 ENERSYS & GNB (Exide) / Warrensburg, MO & Ft. Smith, AR C / IDIQ NSWC CRANE Feb 2024 Feb 2025 1 916,000.00 Y 2026 ENERSYS & GNB (Exide) / Warrensburg, MO & Ft. Smith, AR C / IDIQ NSWC CRANE Feb 2026 Feb 2027 1 996,000.00 N UNCLASSIFIED Page 7 of 7 P-1 Line #14 (Each) RFP Issue Date Volume 1 - 347 === page 426 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 348 === page 427 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0946 / LPD Class Support Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 496.171 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 496.171 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 496.171 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 45.738 96.542 - - 45.738 96.542 - - 45.738 96.542 213.723 - 0.000 213.723 - 213.723 - 0.000 213.723 - 213.723 0.000 213.723 216.472 216.472 216.472 206.673 206.673 206.673 212.614 To FY 2031 Complete 216.792 212.614 216.792 212.614 216.792 Total 701.828 2,406.553 701.828 2,406.553 701.828 2,406.553 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - 9.108 9.874 - - - 18.982 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget provides funding for the in service LPD 17 Class program support equipment. Funding is required to upgrade mission critical electronics and Hull Mechanical & Engineering (HM&E) systems including the Engineering Control Systems (ECS), Ship Control Systems (SCS), Degaussing Systems, Shipboard Wide-Area Network (SWAN), commercial software products for ECS, SCS, Command, Control, Communications, Computers, Intelligence, Surveillance and Reconnaissance (C4ISR) and Administrative Communications for Legacy Modernization and LPD 17 Class Midlife Modernization commencing in FY2028, with two-year ahead of availability funding requirements starting in FY2026. Ship Installation Drawings (SIDs) funding and tasking are now required at A-2 years of CNO availability start date, vice A-1 years due to contracting milestones requiring pre-solicitation variables to be finalized. [P40A / CJ010 - Schoolhouse TTE]: CJ010 - SCHOOLHOUSE TTE Funding for Schoolhouse Technical Training Equipment (TTE) is for the infrastructure and equipment to set up the schoolhouses for multiple systems such as ECS and SCS 60Hz and Ship Service Diesel Generators (SSDG). The schoolhouses will provide critical training to sailors in operation and maintenance of those systems. [P40A / CJ020 - Shore Based Spares]: CJ020 SHORE BASED SPARES Shore-Based Spares are critical long lead time items that are staged shore-side in the event of a catastrophic failure on an operational ship. These spares must be periodically replenished as assets are utilized. Furthermore, as the LPD 17 Class continues to introduce new ships (additional) to the fleet, the number of spare requirements increases as additional items are added to the spares list to support newer shipboard configurations. [P40A / CJ080 Conjunctive HM&E AIT]: CJ080 CONJUNCTIVE HM&E ALTERATIONS Conjunctive HM&E Alterations includes design integration, equipment procurement, recurring equipment engineering, equipment integration and Integrated Logistics Services (ILS). [P40A / CJ081 - Navy Common Actuators]: CJ081 Navy Common Actuator Development Program Congressionally enacted requirement for Navy Common Actuator solution and supportability for the Class. [P40A / CJ035 - HM&E CONDITION SYSTEM]: CJ035 HULL, MECHANICAL AND ELECTRICAL CONDITION SYSTEM LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 1 of 38 P-1 Line #15 Volume 1 - 349 === page 428 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0946 / LPD Class Support Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A This solution proposed would implement a Defense-in-Depth Functional Implementation Architecture (DFIA) and meet the requirements of the standards released by the Information Assurance Technical Authority Board (IA TAB) across all the H,M&E systems deploying the ability to protect, detect, react, and restore in a contested environment. The HM&E Condition System will monitor the signals on the HM&E network, both between HM&E systems and also those coming from other functional domains. [P40A / CJ090 - LPD17 Class Mid-life Modernization (ExMOD)]: CJ090 LPD 17 CLASS MID-LIFE MODERNIZATION Conduct Mid-Life modernization on LPD 17 Class Ships in order to ensure they are ready, relevant, and capable of reaching their 40+ year Expected Service Life. [P40A / CJ091-ECS PIMCS/SCS GOV]: CJ091 - ECS PIMCS - SCS Gov Implementation of system upgrades to address the need for a common, sustainable and reliable ECS and SCS across LPD ships which will address obsolescence issues, improve circuit card reliability, reduce circuit card costs, increase cybersecurity posture and provide commonality in steering systems among surface ships. [P3A / CJ030 - HW/SW Obsolescence]: CJ030, CJ032 LPD 17 Hardware/Software HW/SW Obsolescence effort addresses critical hardware obsolescence and technology refreshment issues and supporting class upgrades focused on increased capability and reliability. [P3A - 2 / CJ040 HM&E Electrical Modifications]: CJ040 HM&E ELECTRICAL MODIFICATIONS HM&E Modernization funding is provided to correct mission, safety and reliability issues on electrical systems and ultimately resolve maintenance intensive system concerns. [P3A - 3 / CJ050 - HM&E Survivability Modifications]: CJ050 HM&E SURVIVABILITY MODIFICATIONS HM&E Modernization funding is provided to correct mission, safety and reliability issues on HM&E systems (impacting ship survivability) and ultimately resolve maintenance intensive system concerns. [P3A - 4 / CJ060 - HM&E Mechanical/Auxiliary Modifications]: CJ060, CJ061, CJ062, CJ063 HM&E MECHANICAL/AUXILIARY MODIFICATIONS HM&E Modernization funding is provided to correct mission, safety and reliability issues on mechanical and auxiliary systems and ultimately resolve maintenance intensive system concerns. [P3A - 5 / CJ070 SWAN-CANES Integration]: CJ070 SWAN-CANES Integration SWAN serves as the backbone of the LPD 17 class and funding is necessary to address obsolescence, reliability issues, performance concerns, emergent Fleet requirements including enabling Cryptologic Log On (CLO), removing unsupported software, replacing aging obsolete network hardware (e.g., servers and core switches), and maintaining the Information Assurance posture of the Common Operating Environment (COE), with Consolidated Afloat Networks and Enterprise Services (CANES). LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 2 of 38 P-1 Line #15 Volume 1 - 350 === page 429 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0946 / LPD Class Support Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a LPD Class Support Equipment - / 98.177 - / 24.965 - / 50.899 P-3a 1 / CJ030 - HW/SW Obsolescence (TBD) - / 65.046 - / 0.600 - / 6.036 - / 3.339 - / 0.000 - / 3.339 P-3a 2 / CJ040 HM&E Electrical Modifications (TBD) - / 31.068 - / 1.493 - / 1.061 - / 3.097 - / 0.000 - / 3.097 P-3a 3 / CJ050 - HM&E Survivability Modifications (TBD) - / 7.450 - / 0.029 - / 2.022 - / 1.354 - / 0.000 - / 1.354 P-3a 4 / CJ060 - HM&E Mechanical/Auxiliary Modifications (TBD) - / 94.797 - / 0.813 - / 1.190 - / 1.970 - / 0.000 - / 1.970 P-3a 5 / CJ070 SWAN-CANES Integration (TBD) - / 95.309 - / 4.924 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-3a 6 / CJ032 HW/SW Obsolescence Wireless Portable Communications Main Site Upgrades (TBD) - / 18.528 - / 1.626 - / 2.860 - / 0.877 - / 0.000 - / 0.877 P-3a 7 / CJ061 Titanium Valve Replacement (TBD) - / 34.886 - / 0.880 - / 5.813 - / 0.024 - / 0.000 - / 0.024 P-3a 8 / CJ062 HM&E Mechanical/Auxiliary Mods Knuckleboom Crane Improvements (TBD) - / 9.142 - / 0.591 - / 0.907 - / 0.000 - / 0.000 - / 0.000 P-3a 9 / CJ063 HM&E Mechanical/Auxiliary Mod Common Fuel Rail (TBD) - / 41.768 - / 9.817 - / 25.754 - / 20.300 - / 0.000 - / 20.300 P-40 Total Gross/Weapon System Cost - / 496.171 - / 45.738 - / 96.542 - / 213.723 - / 0.000 - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code - / 182.762 - / - - / 182.762 / 213.723 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a LPD Class Support Equipment P-3a 1 / CJ030 - HW/SW Obsolescence (TBD) - - / 6.431 / - - / 2.189 - / 0.777 - / 0.794 - / 1.636 - / 86.848 P-3a 2 / CJ040 HM&E Electrical Modifications (TBD) - / 4.599 - / 3.195 - / 2.921 - / 3.078 - / 0.649 - / 51.161 P-3a 3 / CJ050 - HM&E Survivability Modifications (TBD) - / 5.248 - / 1.820 - / 0.000 - / 0.000 - / 0.000 - / 17.923 P-3a 4 / CJ060 - HM&E Mechanical/Auxiliary Modifications (TBD) - / 4.379 - / 0.219 - / 0.669 - / 0.000 - / 0.000 - / 104.037 P-3a 5 / CJ070 SWAN-CANES Integration (TBD) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 100.233 P-3a 6 / CJ032 HW/SW Obsolescence Wireless Portable Communications Main Site Upgrades (TBD) - / 3.916 - / 9.099 - / 4.086 - / 3.383 - / 5.592 - / 49.967 P-3a 7 / CJ061 Titanium Valve Replacement (TBD) - / 2.013 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 43.616 P-3a 8 / CJ062 HM&E Mechanical/Auxiliary Mods Knuckleboom Crane Improvements (TBD) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 10.640 P-3a 9 / CJ063 HM&E Mechanical/Auxiliary Mod Common Fuel Rail (TBD) - / 17.314 - / 3.631 - / 14.175 - / 0.007 - / 18.317 - / 151.083 P-40 Total Gross/Weapon System Cost - / 216.472 / 206.673 - / 212.614 / 216.792 - / 701.828 - / - - / - - - / - - / - - - / - / 2,406.553 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 3 of 38 P-1 Line #15 Volume 1 - 351 === page 430 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0946 / LPD Class Support Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A The FY 2026 budget for 0946, LPD CLASS SUPPORT EQUIPMENT, includes $96,542 thousand of discretionary funding and $29,000 thousand of mandatory funding for a total of $125,542 thousand. The mandatory funds supported AMPHIB modernization, LPD availability procurements and LPD Midlife availabilities. The FY2027 increase of $117.181M from FY2026 $96.542M to FY2027 $213.723M is due to continued LPD 17 Class Midlife Modernization requirements supporting LPD18's FY2028 Midlife CNO availability and the addition of LPD20's FY2029 Midlife CNO availability. Funding is required up to two years ahead of the availability to account for LPD18 & LPD20 Ship Checks, Ship Installation Drawings (SIDs), and Long Lead Time Material procurements in support of their Midlife packages. LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 4 of 38 P-1 Line #15 Volume 1 - 352 === page 431 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: LPD Class Support Equipment FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) CJ010 - Schoolhouse TTE 1.1) CJ010Schoolhouse TTE A - - 1.200 - - - - - - - - - - - - - - - - - 1.200 - - - - - - - - - - - - - - - - - 32.377 - - 5.000 - - - - - 2.000 - - - - - 2.000 - - 32.377 - - 5.000 - - - - - 2.000 - - - - - 2.000 - - 32.383 - - 8.653 - - 1.588 - - 5.664 - - - - - 5.664 - - 32.383 - - 8.653 - - 1.588 - - 5.664 - - - - - 5.664 - - 5.000 - - - - - - - - - - - - - - - - - 5.000 - - - - - - - - - - - - - - - - - 14.748 - - 4.810 - - 2.213 - - 6.977 - - - - - 6.977 - - 14.748 - - 4.810 - - 2.213 - - 6.977 - - - - - 6.977 - - 12.469 - - 6.502 - - 28.298 - - 168.121 - - - - - 168.121 - - 12.469 - - 6.502 - - 28.298 - - 168.121 - - - - - 168.121 - - - - - - - - 18.800 - - - - - - - - - Subtotal: 7) CJ091-ECS PIMCS/SCS GOV - - 0.000 - - - - - 18.800 - - - - - - - - - Total - - 98.177 - - 24.965 - - 50.899 - - - - - - - Subtotal: 1) CJ010 - Schoolhouse TTE 2) CJ020 - Shore Based Spares 2.1) CJ020-Shore Based Spares A (1) Subtotal: 2) CJ020 - Shore Based Spares 3) CJ080 Conjunctive HM&E AIT 3.1) CJ080Conjunctive HM&E Alterations A (2) Subtotal: 3) CJ080 Conjunctive HM&E AIT 4) CJ081 - Navy Common Actuators 4.1) CJ081-Navy Common Actuators A Subtotal: 4) CJ081 - Navy Common Actuators 5) CJ035 - HM&E CONDITION SYSTEM 5.1) CJ035-HM&E CONDITION SYSTEM A (3) Subtotal: 5) CJ035 - HM&E CONDITION SYSTEM 6) CJ090 - LPD17 Class Mid-life Modernization (ExMOD) 6.1) CJ090 - LPD17 Class Mid-life Modernization (ExMOD) A (4) Subtotal: 6) CJ090 - LPD17 Class Mid-life Modernization (ExMOD) 7) CJ091-ECS PIMCS/SCS GOV 7.1) CJ091-ECS PIMCS/SCS GOV (5) A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 5 of 38 182.762 P-1 Line #15 182.762 Volume 1 - 353 === page 432 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment Aggregated Items Title: LPD Class Support Equipment Footnotes: (1) CJ020 Shore Based Spares: Shore-Based Spares are critical long lead time items that are staged shore-side in the event of a catastrophic failure on an operational ship. These spares must be periodically replenished as assets are utilized. Furthermore, as the LPD 17 Class continues to introduce new ships (additional) to the fleet, the number of spare requirements increases as additional items are added to the spares list to support newer shipboard configurations. Remaining funding amount applied to this line may vary depending on the funding amounts needed to support program requirements. The program has a running list of 340+ line items in support of spare needs. Priorities of procurements are determined based on funding available and timeline urgency. FY26 requirement depletion is due to budget reductions. (2) CJ080 Conjunctive HM&E Alterations: The FY2027 funding Increase re-stabilizes the conjunctive requirement as FY 2026 funding decrease is due to historical budget reductions. Conjunctive HM&E Alterations includes design integration, equipment procurement, recurring equipment engineering, equipment integration and Integrated Logistics Services (ILS). (3) (4) CJ035 HM&E Condition System: FY 2027 funding Increase is due to additional LLTM material procurements in support of FY2028 CNO availabilities, and additional FY 2027 Installations. CJ090 LPD17 Class Mid-life: FY26 to FY27 cost increase reflects the addition of LPD20's FY29 CNO availability A-2 year Shipchecks, and long lead time material procurement requirements in addition to ongoing LPD18. FY28 CNO pre avail Design Service Agent (DSA) requirements including Ship Installation Drawings (SIDs) & Integrated Logistic Support (ILS). LPD 17 CLASS MID-LIFE MODERNIZATION supports Class requirements and lethality for Extended Service Life (ESL). (5) CJ091 ECS PIMCS/SCS GOV: The FY 2026 funding increase is due to engineering and first planned procurement in support of first planned implementation. Implementation of system upgrades to address the need for a common, sustainable and reliable ECS and SCS across LPD ships which will address obsolescence issues, improve circuit card reliability, reduce circuit card costs, increase cybersecurity posture and provide commonality in steering systems among surface ships. The FY2027 funding Decrease is due to no additional funding to support requirement. LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 6 of 38 P-1 Line #15 Volume 1 - 354 === page 433 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 1 / CJ030 - HW/SW Obsolescence MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 65.046 0.600 6.036 3.339 0.000 3.339 6.431 2.189 0.777 0.794 1.636 86.848 Total - - - - - - - - - - - - 65.046 0.600 6.036 3.339 0.000 3.339 6.431 2.189 0.777 0.794 1.636 86.848 - - - - - - - - - - - - 65.046 0.600 6.036 3.339 0.000 3.339 6.431 2.189 0.777 0.794 1.636 86.848 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: HW/SW Obsolescence (CJ030) includes funding for procurement and installation of equipment to correct critical obsolescence issues on LPD17 Class mission systems. Resolves operational and obsolescence issues. Replaces current split controllers, resolves rack cooling, modifies loudspeaker cable plant, and provides commonality and system architecture and hardware. [CJ030-HW/SW Obsolescence] HW/SW Obsolescence effort addresses hardware obsolescence/technology refreshment issues, and class upgrades focused on increased capabilities, force protection, and safety. Shipsets of equipment vary in quantities and types of components each fiscal year and within fiscal years. Each ship requires a different number of alterations to be installed, and alteration packages vary in scope and cost based on individual ship configurations. A quantity of "1" represents a single "kit" intended for installation in one ship, in a single Chief of Naval Operations (CNO) Availability. Ships may be receiving more than 1 kit in a single availability based upon the fielding plan for the systems being modernized. DSA costs will also vary by kit due to differences in scope and complexity, and first installation compared to follow-on installations. LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 7 of 38 P-1 Line #15 Volume 1 - 355 === page 434 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / CJ030 - HW/SW Obsolescence MDAP/MAIS Code: Models of Systems Affected: HW/SW Obsolescence Prior Years Modification Type: TBD FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: CJ030 - HW/SW Obsolescence B Kits Recurring 1.1.1) CJ030-HW/SW Obsolescence - NonOrganic (6) Subtotal: Recurring Subtotal: CJ030 - HW/SW Obsolescence Subtotal: Procurement, All Modification Items 122 / 27.801 / 27.801 - 1 / 0.375 / 27.801 - / 0.375 - 122 / 27.801 2 / 0.353 / 0.375 - / 0.353 - 1 / 0.375 / 0.353 - / - / 1.185 - / - 4 / 1.185 - / - / 1.185 - / - - 2 / 0.353 - 4 / 1.185 - 4 / 1.185 / 1.185 - 4 / 0.722 / 1.185 - / 0.722 - 4 / 1.185 1 / 0.192 / 0.722 - / 0.192 - 4 / 0.722 / 0.192 - / - / 0.382 - / - 2 / 0.382 - / - / 0.382 - / - - 1 / 0.192 - 2 / 0.382 - 1 / 1.629 / 1.629 - 1 / 1.629 / 1.629 - 137 / 32.639 / 32.639 - 137 / 32.639 / 32.639 - Support (All Modification Items) 2.1) CJ030 Non-Recurring Engineering Subtotal: Support - / 0.330 - / - - / - - / - - / - - / - - / - - / - - / - - / - / - - / 0.330 - / 0.330 - / - - / - - / - - / - - / - - / - - / - - / - - / - - - / 0.000 - / 0.330 Installation Modification Item 1 of 1: CJ030 - HW/SW Obsolescence - / 36.915 - / 0.225 - / 5.683 - / 2.154 Subtotal: Installation - / 36.915 - / 0.225 - / 5.683 - / 2.154 - / 0.000 - / 2.154 - / 5.709 - / 1.997 - / 0.395 - / 0.794 - / 0.007 - / 53.879 / - - / 2.154 - / 5.709 - / 1.997 - / 0.395 - / 0.794 - / 0.007 - / 53.879 - Total Total Cost (Procurement + Support + Installation) LI 0946 - LPD Class Support Equipment Navy 65.046 0.600 6.036 3.339 0.000 UNCLASSIFIED Page 8 of 38 3.339 6.431 2.189 P-1 Line #15 0.777 0.794 1.636 86.848 Volume 1 - 356 === page 435 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / CJ030 - HW/SW Obsolescence MDAP/MAIS Code: Modification Item 1 of 1: CJ030 - HW/SW Obsolescence Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Jun 2025 Mar 2026 Dec 2026 Dec 2027 Dec 2028 FY 2030 Delivery Dates Jun 2026 Mar 2027 Dec 2027 Dec 2028 Dec 2029 FY 2031 Installation Information Method of Implementation: AIT:: Installation Name: CJ030-HW/SW Obsolescence Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 117 / 36.915 - Prior Years 1 / 0.122 4 / 5.055 - / - - / - - / - - / - - / - 0 / 0.000 122 / 42.092 FY 2025 - / - 0 / 0.103 - / - 1 / 0.704 0 / 0.000 1 / 0.704 - / - - / - - / - - / - 0 / 0.000 1 / 0.807 FY 2026 - / - - / - 0 / 0.012 2 / 0.718 0 / 0.000 2 / 0.718 - / - - / - - / - - / - 0 / 0.000 2 / 0.730 FY 2027 - / - - / - 0 / 0.616 0 / 0.018 0 / 0.000 0 / 0.018 4 / 5.463 - / - - / - - / - 0 / 0.000 4 / 6.097 FY 2028 - / - - / - - / - 0 / 0.714 0 / 0.000 0 / 0.714 0 / 0.025 4 / 1.541 - / - - / - 0 / 0.000 4 / 2.280 FY 2029 - / - - / - - / - - / - - / - - / - 0 / 0.221 0 / 0.006 1 / 0.382 - / - 0 / 0.000 1 / 0.609 FY 2030 - / - - / - - / - - / - - / - - / - - / - 0 / 0.450 0 / 0.013 2 / 0.794 0 / 0.000 2 / 1.257 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.007 1 / 0.007 2 / 0.794 1 / 0.007 137 / 53.879 Total 117 / 36.915 1 / 0.225 4 / 5.683 / - - 3 / 2.154 / - 0 / 0.000 3 / 2.154 4 / 5.709 4 / 1.997 1 / 0.395 / - - / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 117 1 - - - - 1 - 3 - - 3 - 3 - 1 - 2 1 1 - 1 - - - - 2 - - 1 137 Out 113 2 - - 1 - - - 4 2 - - - - 1 - - 7 137 1 1 - - - - 4 - - - - 1 Footnotes: (6) FY27 installation funding supports: (1) installation on LPD 26, which was shifted from an FY26 availability into FY27; (2) installations of new Fire Alarm Control Panel (FACP) system on LPD 23 (1) and LPD 27 (1) during CNO availabilities. FY27 procurement funding supports: (4) kits procured for installations on FY28 CNO Availabilities for LPD 18 (2 kits), LPD 19 (1 kit), and LPD 24 (1 kit). Each ship requires a different number of alterations to be installed, and these alteration packages vary in scope and cost based on individual ship configurations. A quantity of "1" represents a single "kit" intended for installation in one ship, LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 9 of 38 P-1 Line #15 Volume 1 - 357 === page 436 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / CJ030 - HW/SW Obsolescence MDAP/MAIS Code: in a single CNO Availability. Ships may be receiving more than 1 kit in a single availability based upon the fielding plan for the systems being modernized. HW/SW Obsolescence requirements are subject to changes in CNO ship availability schedule. LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 10 of 38 P-1 Line #15 Volume 1 - 358 === page 437 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 2 / CJ040 HM&E Electrical Modifications MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 31.068 1.493 1.061 3.097 0.000 3.097 4.599 3.195 2.921 3.078 0.649 51.161 Total - - - - - - - - - - - - 31.068 1.493 1.061 3.097 0.000 3.097 4.599 3.195 2.921 3.078 0.649 51.161 - - - - - - - - - - - - 31.068 1.493 1.061 3.097 0.000 3.097 4.599 3.195 2.921 3.078 0.649 51.161 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: HM&E Modernization funding is provided to correct mission, safety and reliability issues on electrical systems and ultimately resolve maintenance intensive system concerns. LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 11 of 38 P-1 Line #15 Volume 1 - 359 === page 438 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: HM&E Electrical Modifications Modification Type: TBD Prior Years Financial Plan Modification Number / Title: 2 / CJ040 HM&E Electrical Modifications FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: CJ040 HM&E Electrical Modifications B Kits Recurring 1.1.1) CJ040 - HM&E Electrical Upgrades - NonOrganic (7) Subtotal: Recurring 10 / 12.974 - / - - / - / 12.974 - / - - / - 10 / 12.974 - / - - / - - / 12.974 - / - - / - Modification Item 1 of 1: CJ040 HM&E Electrical Modifications - / 18.094 - / 1.493 - Subtotal: Installation - / 18.094 - / 1.493 - Subtotal: CJ040 HM&E Electrical Modifications Subtotal: Procurement, All Modification Items - 3 / 2.470 - / - 3 / 2.470 / - / - - / 2.470 - / - - / 2.470 - / 1.481 - / 0.504 - / 2.055 - / 0.524 - / 0.000 - / 20.008 / 1.061 - / 0.627 / 0.000 - / 0.627 - / 3.118 - / 2.691 - / 0.866 - / 2.554 - / 0.649 - / 31.153 / 1.061 - / 0.627 / - - / 0.627 - / 3.118 - / 2.691 - / 0.866 - / 2.554 - / 0.649 - / 31.153 - - 1 / 0.504 - 4 / 2.055 / 0.000 22 / 20.008 / - 3 / 1.481 / 0.524 - - - / 2.055 1 / 0.524 - 3 / 2.470 / 0.504 4 / 2.055 / 2.470 - / 1.481 1 / 0.504 3 / 2.470 - / 2.470 3 / 1.481 - 1 / 0.524 - / - - / 20.008 22 / 20.008 Installation - Total Total Cost (Procurement + Support + Installation) LI 0946 - LPD Class Support Equipment Navy 31.068 1.493 1.061 3.097 0.000 UNCLASSIFIED Page 12 of 38 3.097 4.599 3.195 P-1 Line #15 2.921 3.078 0.649 51.161 Volume 1 - 360 === page 439 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / CJ040 HM&E Electrical Modifications MDAP/MAIS Code: Modification Item 1 of 1: CJ040 HM&E Electrical Modifications Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Dec 2026 Dec 2027 Dec 2028 Jan 2030 FY 2031 Delivery Dates Dec 2027 Dec 2028 Dec 2029 Jan 2031 Installation Information Method of Implementation: AIT:: Installation Name: CJ040 - HM&E Electrical Upgrades Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 9 / 18.094 10 / 19.587 Prior Years 1 / 1.493 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - 0 / 1.061 0 / 0.015 0 / 0.000 0 / 0.015 3 / 2.891 - / - - / - - / - 0 / 0.000 3 / 3.967 FY 2028 - / - - / - - / - 0 / 0.612 0 / 0.000 0 / 0.612 0 / 0.019 3 / 1.836 - / - - / - 0 / 0.000 3 / 2.467 FY 2029 - / - - / - - / - - / - - / - - / - 0 / 0.208 0 / 0.006 1 / 0.624 - / - 0 / 0.000 1 / 0.838 FY 2030 - / - - / - - / - - / - - / - - / - - / - 0 / 0.849 0 / 0.026 4 / 2.547 0 / 0.000 4 / 3.422 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.216 0 / 0.007 1 / 0.649 1 / 0.872 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - - - Total 9 / 18.094 1 / 1.493 0 / 1.061 0 / 0.627 0 / 0.000 0 / 0.627 3 / 3.118 3 / 2.691 / - 1 / 0.866 / - 4 / 2.554 / - 1 / 0.649 - / - 22 / 31.153 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 9 1 - - - - - - - - - - - 2 - 1 - 1 1 1 - 1 - - - 1 2 1 - 1 22 Out 7 - - - - - - - - 1 - 2 - - - 6 22 - - 2 1 - - - - - - 2 - 1 - Footnotes: (7) HM&E Electrical Modification requirements are subject to changes in the CNO ship availability schedule. During FY 2027: (3) kits will be procured for installations on FY28 CNO Availabilities for LPD 18 (2) kits, and LPD 19 (1) kit. LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 13 of 38 P-1 Line #15 Volume 1 - 361 === page 440 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 3 / CJ050 - HM&E Survivability Modifications MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 7.450 0.029 2.022 1.354 0.000 1.354 5.248 1.820 0.000 0.000 0.000 17.923 Total - - - - - - - - - - - - 7.450 0.029 2.022 1.354 0.000 1.354 5.248 1.820 0.000 0.000 0.000 17.923 - - - - - - - - - - - - 7.450 0.029 2.022 1.354 0.000 1.354 5.248 1.820 0.000 0.000 0.000 17.923 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: CJ050 HM&E SURVIVABILITY MODIFICATIONS HM&E Modernization funding is provided to correct mission, safety and reliability issues on HM&E systems (impacting ship survivability) and ultimately resolve maintenance intensive system concerns. [CJ050 - HM&E Survivability Modifications] Shipsets of equipment vary in quantities and types of components each fiscal year and within a fiscal year. Each ship requires a different number of alterations to be installed, and these alteration packages vary in scope and cost based on individual ship configurations. A quantity of "1" represents a single "kit" intended for installation in one ship, in a single CNO Availability. Ships may be receiving more than 1 kit in a single availability based upon the fielding plan for the systems being modernized, and the actual requirement varies in different louver & screen sizes by increment. Each kit is of a different size and zone increment so they cannot be compared against other kits. DSA costs will also vary by kit due to differences in scope and complexity, and first installation compared to follow-on installations. CONUS ship alterations should be executed during the average installation availability timeframe of 45 days. However, OCONUS ships require 100+ days to complete installation LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 14 of 38 P-1 Line #15 Volume 1 - 362 === page 441 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: HM&E Survivability Modifications Prior Years Financial Plan Modification Number / Title: 3 / CJ050 - HM&E Survivability Modifications Modification Type: TBD FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: CJ050 - HM&E Survivability Modifications B Kits Recurring 1.1.1) CJ050 - HM&E Survivability Modifications NonOrganic (8) Subtotal: Recurring 14 / 3.986 - / - 1 / 0.074 / 3.986 - / - 14 / 3.986 - / - - / 3.986 - / - - / 0.074 Modification Item 1 of 1: CJ050 - HM&E Survivability Modifications - / 3.464 - / 0.029 - Subtotal: Installation - / 3.464 - / 0.029 - Subtotal: CJ050 - HM&E Survivability Modifications Subtotal: Procurement, All Modification Items - - / 0.074 5 / 0.558 - / - 5 / 0.558 / 0.558 - / - 5 / 0.558 - / - - / 0.558 - / - - / 0.558 / 1.948 - / 0.796 / 0.000 - / 1.948 - / 0.796 / - - - 1 / 0.074 - / 0.558 2 / 0.213 - / - - / - - / - - / - 22 / 4.831 / 0.213 - / - - / - - / - 2 / 0.213 - / - - / - - / - - / 0.213 - / - - / - - / - - / 0.000 / 0.796 - / 5.035 - / 1.820 / 0.000 - / 0.000 - / 13.092 / 0.796 - / 5.035 - / 1.820 / - - / 0.000 - / 13.092 - 5 / 0.558 / 0.000 - - / - / 4.831 22 / 4.831 - / 4.831 Installation - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 0946 - LPD Class Support Equipment Navy 7.450 0.029 2.022 1.354 0.000 UNCLASSIFIED Page 15 of 38 1.354 5.248 1.820 P-1 Line #15 0.000 0.000 0.000 17.923 Volume 1 - 363 === page 442 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / CJ050 - HM&E Survivability Modifications MDAP/MAIS Code: Modification Item 1 of 1: CJ050 - HM&E Survivability Modifications Manufacturer Information Manufacturer Name: VARIOUS Manufacturer Location: TBD Administrative Leadtime (in Months): 4 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Apr 2026 Dec 2026 Dec 2027 FY 2029 Delivery Dates Apr 2027 Dec 2027 Dec 2028 FY 2030 FY 2031 Installation Information Method of Implementation: AIT:: Installation Name: CJ050 - HM&E Survivability Modifications Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 14 / 5.262 Prior Years - / - 2 / 1.798 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 12 / 3.464 - / - - / - - - / - - / - - / - - / - - / - - / - - / - - FY 2026 - / - 0 / 0.029 0 / 0.003 1 / 0.721 0 / 0.000 1 / 0.721 - / - - / - - / - - / - 0 / 0.000 1 / 0.753 FY 2027 - / - - / - 0 / 0.147 0 / 0.015 0 / 0.000 0 / 0.015 5 / 5.029 - / - - / - - / - 0 / 0.000 5 / 5.191 FY 2028 - / - - / - - / - 0 / 0.060 0 / 0.000 0 / 0.060 0 / 0.006 2 / 1.820 - / - - / - 0 / 0.000 2 / 1.886 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 1.820 - / - - / - 0 / 0.000 Total 12 / 3.464 0 / 0.029 / - 2 / 1.948 1 / 0.796 0 / 0.000 1 / 0.796 5 / 5.035 / - - / - 22 / 13.092 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 12 - - - - - 2 - - - - - 1 4 - 1 - 2 - - - - - - - - - - - - 22 Out 10 - - - - - - - - - - - - - - - - - - 22 1 1 - - - 2 - - - 4 4 Footnotes: (8) HM&E Survivability Modifications requirements are subject to changes in the CNO ship availability schedule. During FY 2027: (5) kits will be procured for FY28 CNO Availability installations on LPD 18 (3) kits, and LPD 19 (2) kits. LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 16 of 38 P-1 Line #15 Volume 1 - 364 === page 443 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 4 / CJ060 - HM&E Mechanical/Auxiliary Modifications MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 94.797 0.813 1.190 1.970 0.000 1.970 4.379 0.219 0.669 0.000 0.000 - - - - - - - - - - - 94.797 0.813 1.190 1.970 0.000 1.970 4.379 0.219 0.669 0.000 0.000 - - - - - - - - - - - 94.797 0.813 1.190 1.970 0.000 1.970 4.379 0.219 0.669 0.000 0.000 Total 104.037 104.037 104.037 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: HM&E Mechanical/Auxiliary Modifications (CJ060) includes funding for procurement and installation of equipment to support upgrades of shipboard mechanical/auxiliary systems to a more sustainable, reliable configuration on LPD17 Class ships. HM&E Mechanical/Auxiliary Modifications include: -MIDE Bulkhead Shaft Seal -Helo Hangar Door Control Modifications -2nd Pass Reverse Osmosis (RO) Unit Upgrade, RO Unit Potable Water Electrolytic Disinfectant Generator (EDG) Recirculation Capability -Aviation Maintenance Bridge Crane Replacement -Scullery Improvements -Branch Piping Modifications [CJ060 HM&E Mechanical/Auxiliary Modifications] Shipsets of equipment vary in quantities and types of components each fiscal year and within a fiscal year. Each ship requires a different number of alterations to be installed, and these alteration packages vary in scope and cost based on individual ship configurations. A quantity of "1" represents a single "kit" intended for installation in one ship, in a single CNO Availability. Ships may be receiving more than 1 kit in a single availability based upon the fielding plan for the systems being modernized. DSA costs will also vary by kit due to differences in scope and complexity, and first installation compared to follow-on installations. The program production lead times have increased from 12 months to 15 months based on actual procurement buys to date. LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 17 of 38 P-1 Line #15 Volume 1 - 365 === page 444 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: HM&E Mechanical/ Auxiliary Modifications Prior Years Financial Plan Modification Number / Title: 4 / CJ060 - HM&E Mechanical/Auxiliary Modifications Modification Type: TBD FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: CJ060 - HM&E Mechanical/ Auxiliary Modifications B Kits Recurring 1.1.1) CJ060 HM&E Mechanical/Auxiliary Modifications - NonOrganic (9) Subtotal: Recurring Subtotal: CJ060 - HM&E Mechanical/Auxiliary Modifications Subtotal: Procurement, All Modification Items 79 / 47.991 - / - 3 / 0.701 / 47.991 - / - 79 / 47.991 - / - / 47.991 - / - - / 2.667 - / - - / - - / 2.667 - / - - / - - - / 0.701 - / 0.701 - / - / 0.951 - / - 4 / 0.951 - / - / 0.951 - / - - / - - / - - / - - / - - 3 / 0.701 - 4 / 0.951 - 4 / 0.951 - / - / 0.951 - / - 4 / 0.951 - / - / 0.951 - / - - / - - / - - / - - / - - - 1 / 0.216 - / - - / - - / - / 0.216 - / - - / - 1 / 0.216 - / - - / - / 0.216 - / - - / - - / - - / - - / - / - - / 2.667 - / - - / - - / - - / 0.000 - / 2.667 / 0.000 - / 0.000 - / 51.511 / - - / 0.000 - / 51.511 - - / 0.000 87 / 49.859 - / / 0.000 - / 49.859 - 87 / 49.859 / 49.859 - Support (All Modification Items) 2.1) Non-Recurring Engineering Subtotal: Support - Installation Modification Item 1 of 1: CJ060 - HM&E Mechanical/ Auxiliary Modifications - / 44.139 - / 0.813 - / 0.489 - / 1.019 Subtotal: Installation - / 44.139 - / 0.813 - / 0.489 - / 1.019 - / 0.000 - / 1.019 - / 4.379 - / 0.003 - / 0.669 / - - / 1.019 - / 4.379 - / 0.003 - / 0.669 - - Total Total Cost (Procurement + Support + Installation) LI 0946 - LPD Class Support Equipment Navy 94.797 0.813 1.190 1.970 0.000 UNCLASSIFIED Page 18 of 38 1.970 4.379 0.219 P-1 Line #15 0.669 0.000 0.000 104.037 Volume 1 - 366 === page 445 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / CJ060 - HM&E Mechanical/Auxiliary Modifications MDAP/MAIS Code: Modification Item 1 of 1: CJ060 - HM&E Mechanical/Auxiliary Modifications Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 Contract Dates Jun 2026 Dec 2026 FY 2028 Jan 2029 FY 2029 Delivery Dates Jun 2027 Dec 2027 Jan 2030 FY 2030 FY 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: CJ060 HM&E Mechanical/Auxiliary Modifications Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 78 / 44.139 79 / 44.566 Prior Years 1 / 0.427 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2026 - / - 0 / 0.386 0 / 0.101 2 / 1.019 0 / 0.000 2 / 1.019 1 / 1.295 - / - - / - - / - 0 / 0.000 3 / 2.801 FY 2027 - / - - / - 0 / 0.388 - / - - / - - / - 4 / 2.879 - / - - / - - / - 0 / 0.000 4 / 3.267 FY 2028 - / - - / - - / - - / - - / - - / - - - / - - / - - / - - FY 2029 - / - - / - - / - - / - - / - - / - 0 / 0.205 0 / 0.003 1 / 0.669 - / - 0 / 0.000 1 / 0.877 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.669 - / - 0 / 0.000 Total 78 / 44.139 / - 1 / 0.813 0 / 0.489 2 / 1.019 0 / 0.000 2 / 1.019 / - 5 / 4.379 0 / 0.003 / - - / - - / - / - 87 / 51.511 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 78 - - 1 - - - - - - - 2 - 4 - 1 - - - - - - 1 - - - - - - - 87 Out 64 - - - 14 - - - - - - - - - - - - - 1 - - - - - - 1 1 4 - 2 87 Footnotes: (9) Each ship requires a different number of alterations to be installed, and these alteration packages vary in scope and cost based on individual ship configurations. A quantity of "1" represents a single "kit" intended for installation in one ship, in a single CNO Availability. Ships may be receiving more than 1 kit in a single availability based upon the fielding plan for the systems being modernized. HM&E Mechanical/ LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 19 of 38 P-1 Line #15 Volume 1 - 367 === page 446 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 4 / CJ060 - HM&E Mechanical/Auxiliary Modifications MDAP/MAIS Code: Auxiliary Modifications requirements are subject to changes in the CNO ship availability schedule. During FY 2027: (4) kits will be procured for FY28 CNO Availability installations on LPD 18 (2) kits, and LPD 19 (2) kits. LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 20 of 38 P-1 Line #15 Volume 1 - 368 === page 447 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 5 / CJ070 SWAN-CANES Integration MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 95.309 4.924 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - - 95.309 4.924 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - - 95.309 4.924 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Total 100.233 100.233 100.233 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: CJ070 SWAN-CANES Integration The results of the Shipboard Wide Area Network (SWAN) / Consolidated Afloat Networks and Enterprise Services (CANES) study directed the replacement of the C4I capability of the LPD 17 Class SWAN with CANES and the conversion of the non-C4I SWAN into a new HM&E Network (mini SWAN). SWAN funding is required to field the new HM&E Network in support of the CANES installation. In addition, funding is required to sustain the legacy SWAN, while the LPD 17 Class ships await the CANES/HM&E Network back fit installation. SWAN serves as the backbone of the LPD 17 class and funding is necessary to address obsolescence, reliability issues, performance concerns, emergent Fleet requirements including enabling Cryptologic Log On (CLO), removing unsupported software, replacing aging obsolete network hardware (e.g., servers and core switches), and maintaining the Information Assurance posture of the Common Operating Environment (COE). This funding is vital to ensure the LPD 17 Class ships can combat the evolving cyber threat. LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 21 of 38 P-1 Line #15 Volume 1 - 369 === page 448 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: LPD 17 Class SWANCANES Integration Prior Years Financial Plan Modification Number / Title: 5 / CJ070 SWAN-CANES Integration Modification Type: TBD FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: CJ070 SWAN-CANES Integration B Kits Recurring 1.1.1) CJ070 - SWAN-CANES Integration - NonOrganic 121 / 37.866 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 37.866 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 8.088 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 8.088 - / - - / - - / - - / - - / - - / - - / - - / - - / - 121 / 45.954 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 45.954 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 - / 45.954 Modification Item 1 of 1: CJ070 SWAN-CANES Integration - / 49.355 - / 4.924 / 0.000 - / 0.000 - / 54.279 Subtotal: Installation - / 49.355 - / 4.924 / - - / 0.000 - / 54.279 (10) Subtotal: Recurring - - / / 0.000 - 121 / 37.866 / 37.866 - Non-Recurring 1.2.1) SWAN-CANES Integration - Organic Subtotal: Non-Recurring Subtotal: CJ070 SWAN-CANES Integration Subtotal: Procurement, All Modification Items - / - - / 8.088 / 0.000 - / 8.088 / - 121 / 45.954 Installation - / 0.000 - / - - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 0946 - LPD Class Support Equipment Navy 95.309 4.924 0.000 0.000 0.000 UNCLASSIFIED Page 22 of 38 0.000 0.000 0.000 P-1 Line #15 0.000 0.000 0.000 100.233 Volume 1 - 370 === page 449 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 5 / CJ070 SWAN-CANES Integration MDAP/MAIS Code: Modification Item 1 of 1: CJ070 SWAN-CANES Integration Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 2 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: AIT:: Installation Name: CJ070 - SWAN-CANES Integration Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 119 / 49.355 121 / 54.279 Prior Years 2 / 4.924 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 4.924 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 119 / 49.355 121 / 54.279 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 119 - - 2 - - - - - - - - - - - - - - - - - - - - - - - - - - 121 Out 115 - - 4 - - - - - - - - - - - - - - - - - - - - - - - - - 121 2 Footnotes: (10) FY25 is the last year for the last (2) ship installations for this requirement. All LPDs will be operating on CANES and this cost code no longer funded as of FY26. LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 23 of 38 P-1 Line #15 Volume 1 - 371 === page 450 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 6 / CJ032 HW/SW Obsolescence Wireless Portable Communications Main Site Upgrades MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 18.528 1.626 2.860 0.877 0.000 0.877 3.916 9.099 4.086 3.383 5.592 49.967 Total - - - - - - - - - - - - 18.528 1.626 2.860 0.877 0.000 0.877 3.916 9.099 4.086 3.383 5.592 49.967 - - - - - - - - - - - - 18.528 1.626 2.860 0.877 0.000 0.877 3.916 9.099 4.086 3.383 5.592 49.967 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: [CJ032-WPCS Main Site Upgrades] WIRELESS PORTABLE COMMUNICATIONS SYSTEM (WPCS) Hardware/Software (CJ032): HW/SW Obsolescence effort addresses critical hardware obsolescence and technology refreshment issues and supporting class upgrades focused on increased capability and reliability. Funding will support procurement of hardware and software changes to the WPCS Main Site. Shipsets of equipment vary in quantities and types of components each fiscal year and within a fiscal year. Each ship requires a different number of alterations to be installed, and these alteration packages vary in scope and cost based on individual ship configurations. A quantity of "1" represents a single "kit" intended for installation in one ship, in a single Chief of Naval Operations (CNO) Availability. Ships may be receiving more than 1 kit in a single availability based upon the fielding plan for the systems being modernized. Requirements are subject to changes in the CNO ship availability schedule. DSA costs will also vary by kit due to differences in scope and complexity, and first installation compared to follow-on installations. LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 24 of 38 P-1 Line #15 Volume 1 - 372 === page 451 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 6 / CJ032 HW/SW Obsolescence Wireless Portable Communications Main Site Upgrades FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: CJ032 HW/SW Obsolescence Wireless Portable Communications Main Site Upgrades B Kits Recurring 1.1.1) CJ032-WPCS Main Site Upgrades - NonOrganic (11) Subtotal: Recurring 6 / 15.441 - / - 1 / 2.737 - / - - / - - / - / 15.441 - / - 6 / 15.441 - / - / 15.441 - / - - / 0.137 - / - - / 0.137 - / - Modification Item 1 of 1: CJ032 HW/SW Obsolescence Wireless Portable Communications Main Site Upgrades - / 2.950 - / 1.626 - / 0.123 - / 0.877 Subtotal: Installation - / 2.950 - / 1.626 - / 0.123 - / 0.877 - Subtotal: CJ032 HW/SW Obsolescence Wireless Portable Communications Main Site Upgrades Subtotal: Procurement, All Modification Items - 1 / 2.848 / 2.737 - / - - / - - / - 1 / 2.737 - / - - / - - / - / 2.737 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - - / 2.848 3 / 8.714 - / 2.848 - / 8.714 - 1 / 2.848 / 8.714 - / - 1 / 3.265 / 2.963 - / - - / - / 2.963 - / - - / - - / - / - - / 0.137 - / - - / - - / 0.000 - / 0.137 - / 3.265 13 / 35.968 1 / 2.963 - 3 / 8.714 - 1 / 2.963 - 1 / 3.265 / 3.265 - / 35.968 - 13 / 35.968 / 35.968 - Support (All Modification Items) 2.1) Non-Recurring Engineering Subtotal: Support - Installation - / 0.000 - / 0.877 - / 1.068 - / 0.385 - / 1.123 - / 3.383 - / 2.327 - / 13.862 / - - / 0.877 - / 1.068 - / 0.385 - / 1.123 - / 3.383 - / 2.327 - / 13.862 - Total Total Cost (Procurement + Support + Installation) LI 0946 - LPD Class Support Equipment Navy 18.528 1.626 2.860 0.877 0.000 UNCLASSIFIED Page 25 of 38 0.877 3.916 9.099 P-1 Line #15 4.086 3.383 5.592 49.967 Volume 1 - 373 === page 452 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 6 / CJ032 HW/SW Obsolescence Wireless Portable Communications Main Site Upgrades MDAP/MAIS Code: Modification Item 1 of 1: CJ032 HW/SW Obsolescence Wireless Portable Communications Main Site Upgrades Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 15 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates May 2026 Nov 2027 Mar 2029 Feb 2030 FY 2031 Delivery Dates Aug 2027 Feb 2029 Jun 2030 May 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: CJ032-WPCS Main Site Upgrades Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 3 / 2.950 2 / 1.626 0 / 0.003 1 / 0.874 0 / 0.000 1 / 0.874 - / - - / - - / - - / - 0 / 0.000 6 / 5.453 FY 2025 - / - - / - - - - - - / - - / - - / - - / - - FY 2026 - / - - / - 0 / 0.120 0 / 0.003 0 / 0.000 0 / 0.003 1 / 0.943 - / - - / - - / - 0 / 0.000 FY 2027 - / - - / - - / - - / - - / - - / - - - / - - / - - / - - FY 2028 - / - - / - - / - - / - - / - - / - 0 / 0.125 0 / 0.003 1 / 0.983 - / - 0 / 0.000 1 / 1.111 FY 2029 - / - - / - - / - - / - - / - - / - - / - 0 / 0.382 0 / 0.010 3 / 3.380 0 / 0.000 3 / 3.772 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.130 0 / 0.003 1 / 1.231 1 / 1.364 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 1.096 1 / 1.096 Total 3 / 2.950 3 / 3.383 2 / 2.327 13 / 13.862 Installation Cost 2 / 1.626 / - 0 / 0.123 / - 1 / 0.877 / - 0 / 0.000 / - 1 / 0.877 / - 1 / 1.068 0 / 0.385 1 / 1.123 / - - / - 1 / 1.066 / - - / - - / - / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 3 1 - 1 - - - - - - - 1 - 1 - - - - - - - 1 - - - 1 1 1 - 2 13 Out 1 - 1 - - - - - - - - - - - 1 - - - - 5 13 - 1 2 - - - 1 - 1 - Footnotes: (11) During FY 2027: There is no planned procurement. LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 26 of 38 P-1 Line #15 Volume 1 - 374 === page 453 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 7 / CJ061 Titanium Valve Replacement MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 34.886 0.880 5.813 0.024 0.000 0.024 2.013 0.000 0.000 0.000 0.000 43.616 Total - - - - - - - - - - - - 34.886 0.880 5.813 0.024 0.000 0.024 2.013 0.000 0.000 0.000 0.000 43.616 - - - - - - - - - - - - 34.886 0.880 5.813 0.024 0.000 0.024 2.013 0.000 0.000 0.000 0.000 43.616 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: [CJ061-Titanium Valves Replacement Phase 3] Scheduling differences between Phases 1, 2, & 3 are all based on size of valves (8 inches, 10 inches, & 12 inches) and location of valves in the hull, for better installation planning. Shipsets of equipment vary in quantities and types of components each fiscal year and within a fiscal year. Each ship requires a different number of alterations to be installed, and these alteration packages vary in scope and cost based on individual ship configurations. A quantity of "1" represents a single "kit" intended for installation in one ship, in a single Chief of Naval Operations (CNO) Availability. Ships may be receiving more than 1 kit in a single availability based upon the fielding plan for the systems being modernized. DSA costs will also vary by kit due to differences in scope and complexity, and first installation compared to follow-on installations. All Phase III procurements have been moved to A-2 years prior to installation, vice A-1 year prior to installation, due to actual lead times encountered on previously procured ship sets. LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 27 of 38 P-1 Line #15 Volume 1 - 375 === page 454 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 7 / CJ061 Titanium Valve Replacement FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 3: Titanium Valve Replacement Phase 1 B Kits Recurring 1.1.1) CJ061-Titanium Valve Replacement Phase 1 NonOrganic Subtotal: Recurring - Subtotal: Titanium Valve Replacement Phase 1 2 / 3.728 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 3.728 / 3.728 - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 3.728 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 / - 2 / 3.728 6 / 4.967 - / - 1 / 0.960 - / - - / - - / - - / - - / - - / - - / - - / - 7 / 5.927 - - / 3.728 Modification Item 2 of 3: Titanium Valve Replacement Phase 2 B Kits Recurring 2.1.1) CJ061-Titanium Valve Replacement Phase 2 NonOrganic (12) Subtotal: Recurring / 4.967 - / - / 0.960 - / - - / - - / - - / - - / - - / - - / - 6 / 4.967 - / - 1 / 0.960 - / - - / - - / - - / - - / - - / - - / - - / - 7 / 5.927 5 / 16.563 - / - 1 / 3.599 - / - - / - - / - - / - - / - - / - - / - - / - 6 / 20.162 - Subtotal: Titanium Valve Replacement Phase 2 - / 0.000 - - / 5.927 Modification Item 3 of 3: Titanium Valve Replacement Phase 3 B Kits Recurring 3.1.1) CJ061-Titanium Valves Replacement Phase 3 NonOrganic (13) Subtotal: Recurring Subtotal: Procurement, All Modification Items / 16.563 - / - 5 / 16.563 - / - / 25.258 - / - - Subtotal: Titanium Valve Replacement Phase 3 - / 3.599 - / - - / - - / - - / - - / - - / - - / - 1 / 3.599 - / - - / - - / - - / - - / - - / - - / - - / 4.559 - / - - / - - / - - / - - / - - / - - / - - / 0.000 - / 0.000 - / 20.162 - / - 6 / 20.162 / 29.817 - Installation Modification Item 1 of 3: Titanium Valve Replacement Phase 1 - / 1.675 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 1.675 Modification Item 2 of 3: Titanium Valve Replacement Phase 2 - / 5.179 - / 0.000 - / 0.136 - / 0.009 - / 0.000 - / 0.009 - / 1.036 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 6.360 Modification Item 3 of 3: Titanium Valve Replacement Phase 3 - / 2.774 - / 0.880 - / 1.118 - / 0.015 - / 0.000 - / 0.015 - / 0.977 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 5.764 LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 28 of 38 P-1 Line #15 Volume 1 - 376 === page 455 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Subtotal: Installation Modification Number / Title: 7 / CJ061 Titanium Valve Replacement FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) - / 9.628 - / 0.880 - / 1.254 - / 0.024 / - - - / 0.024 - / 2.013 - / - - / - - / - - / 0.000 - / 13.799 Total Total Cost (Procurement + Support + Installation) LI 0946 - LPD Class Support Equipment Navy 34.886 0.880 5.813 0.024 0.000 UNCLASSIFIED Page 29 of 38 0.024 2.013 0.000 P-1 Line #15 0.000 0.000 0.000 43.616 Volume 1 - 377 === page 456 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 7 / CJ061 Titanium Valve Replacement MDAP/MAIS Code: Modification Item 1 of 3: Titanium Valve Replacement Phase 1 Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: [none specified]:: Installation Name: CJ061-Titanium Valve Replacement Phase 1 Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 2 / 1.675 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 1.675 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 2 / 1.675 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 2 / 1.675 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 Out 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2 1 LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 30 of 38 P-1 Line #15 Volume 1 - 378 === page 457 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 7 / CJ061 Titanium Valve Replacement MDAP/MAIS Code: Modification Item 2 of 3: Titanium Valve Replacement Phase 2 Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 18 FY 2025 FY 2026 Contract Dates Jun 2026 Delivery Dates Dec 2027 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: CJ061-Titanium Valve Replacement Phase 2 Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 6 / 5.179 Prior Years 6 / 5.179 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2026 - / - - / - 0 / 0.136 0 / 0.009 0 / 0.000 0 / 0.009 1 / 1.036 - / - - / - - / - 0 / 0.000 1 / 1.181 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 6 / 5.179 - / - 0 / 0.136 1 / 1.036 - / - - / - - / - 0 / 0.000 0 / 0.009 0 / 0.000 0 / 0.009 / - - / - 7 / 6.360 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 6 - - - - - - - - - - - - 1 - - - - - - - - - - - - - - - - 7 Out 5 - - - - - - - - - - - - - - - - - - - - - - - - - - 7 1 LI 0946 - LPD Class Support Equipment Navy - UNCLASSIFIED Page 31 of 38 1 P-1 Line #15 Volume 1 - 379 === page 458 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 7 / CJ061 Titanium Valve Replacement MDAP/MAIS Code: Modification Item 3 of 3: Titanium Valve Replacement Phase 3 Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 18 FY 2025 FY 2026 Contract Dates Jun 2026 Delivery Dates Dec 2027 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: CJ061-Titanium Valves Replacement Phase 3 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 3 / 2.774 1 / 0.880 1 / 0.982 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 5 / 4.636 FY 2025 - / - - / - - - / - - / - - / - - / - - / - - / - - / - - FY 2026 - / - - / - 0 / 0.136 0 / 0.015 0 / 0.000 0 / 0.015 1 / 0.977 - / - - / - - / - 0 / 0.000 1 / 1.128 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 3 / 2.774 1 / 0.977 - / - - / - - / - 0 / 0.000 Installation Cost 1 / 0.880 / - 1 / 1.118 0 / 0.015 0 / 0.000 0 / 0.015 / - - / - 6 / 5.764 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 3 1 - - - - 1 - - - - - - 1 - - - - - - - - - - - - - - - - 6 Out 1 1 - - - - - - - - 1 - - - - - - - - - - - - - - - 6 1 1 - 1 Footnotes: (12) (13) There is no planned procurement in FY2027 and across FYDPs. There is no planned procurement in FY2027 and across FYDPs. LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 32 of 38 P-1 Line #15 Volume 1 - 380 === page 459 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 8 / CJ062 HM&E Mechanical/Auxiliary Mods Knuckleboom Crane Improvements MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 9.142 0.591 0.907 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 10.640 Total - - - - - - - - - - - - 9.142 0.591 0.907 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 10.640 - - - - - - - - - - - - 9.142 0.591 0.907 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 10.640 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: [CJ062-Knuckleboom Crane Improvement] KNUCKLEBOOM CRANE IMPROVEMENTS Modernization funding is provided to correct mission, safety and reliability issues on mechanical and auxiliary systems and ultimately resolve maintenance intensive system concerns. Funding will support boat and cargo crane safety upgrades. Shipsets of equipment vary in quantities and types of components each fiscal year and within a fiscal year. Each ship requires a different number of alterations to be installed, and these alteration packages vary in scope and cost based on individual ship configurations. A quantity of "1" represents a single "kit" intended for installation in one ship, in a single Chief of Naval Operations (CNO) Availability. Ships may be receiving more than 1 kit in a single availability based upon the fielding plan for the systems being modernized. DSA costs will also vary by kit due to differences in scope and complexity, and first installation compared to follow-on installations. LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 33 of 38 P-1 Line #15 Volume 1 - 381 === page 460 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 8 / CJ062 HM&E Mechanical/Auxiliary Mods Knuckleboom Crane Improvements FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: CJ062 HM&E Mechanical/ Auxiliary Mods Knuckleboom Crane Improvements B Kits Recurring 1.1.1) CJ062-Knuckleboom Crane Improvement NonOrganic 8 / 4.245 (14) Subtotal: Recurring - Subtotal: CJ062 HM&E Mechanical/Auxiliary Mods Knuckleboom Crane Improvements Subtotal: Procurement, All Modification Items / 4.245 1 / 0.588 - / - - / - - / - - / - - / - - / - - / - - / - / 0.588 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.588 - / - - / - - / - - / - - / - - / - - / - - / - / 0.588 - / - - / - - / - - / - - / - - / - - / - - / - - 8 / 4.245 - - / 4.245 - / 0.300 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.300 - / - - / - - / - - / - - / - - / - - / - - / - - / - - Modification Item 1 of 1: CJ062 HM&E Mechanical/ Auxiliary Mods Knuckleboom Crane Improvements - / 4.597 - / 0.003 - / 0.907 / 0.000 - Subtotal: Installation - / 4.597 - / 0.003 - / 0.907 / - - - / 0.000 - - / - - 9 / 4.833 - / - / 4.833 9 / 4.833 / 0.000 - / 4.833 / - - / 0.300 / 0.000 - / 0.300 / 0.000 - / 5.507 / 0.000 - / 5.507 Support (All Modification Items) 2.1) Non-Recurring Engineering Subtotal: Support - Installation - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 0946 - LPD Class Support Equipment Navy 9.142 0.591 0.907 0.000 0.000 UNCLASSIFIED Page 34 of 38 0.000 0.000 0.000 P-1 Line #15 0.000 0.000 0.000 10.640 Volume 1 - 382 === page 461 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 8 / CJ062 HM&E Mechanical/Auxiliary Mods Knuckleboom Crane Improvements MDAP/MAIS Code: Modification Item 1 of 1: CJ062 HM&E Mechanical/Auxiliary Mods Knuckleboom Crane Improvements Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBDTBD Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 Contract Dates Mar 2025 Delivery Dates Mar 2026 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: [none specified]:: Installation Name: CJ062-Knuckleboom Crane Improvement Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - Prior Years 6 / 4.597 - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.000 8 / 4.597 FY 2025 - / - 0 / 0.003 / - 1 / 0.907 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 0.910 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 6 / 4.597 1 / 0.907 - / - - / - - / - - / - - / - - / - - / - 2 / 0.000 0 / 0.003 9 / 5.507 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 6 - - - - - 1 - - - - - - - - - - - - - - - - - - - - - - 2 9 Out 4 - - - - - - - - - - - - - - - - - - - - - - - 2 9 1 - 1 - 1 Footnotes: (14) No FY2027 and follow on year: procurements or installations. LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 35 of 38 P-1 Line #15 Volume 1 - 383 === page 462 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 9 / CJ063 HM&E Mechanical/Auxiliary Mod Common Fuel Rail MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 41.768 9.817 25.754 20.300 0.000 20.300 17.314 3.631 14.175 0.007 18.317 - - - - - - - - - - - 41.768 9.817 25.754 20.300 0.000 20.300 17.314 3.631 14.175 0.007 18.317 - - - - - - - - - - - 41.768 9.817 25.754 20.300 0.000 20.300 17.314 3.631 14.175 0.007 18.317 Total 151.083 151.083 151.083 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: [CJ063-Common Fuel Rail] FUEL INJECTION COMMON RAIL Modernization funding is provided to correct mission, safety and reliability issues on Main Propulsion Diesel Engine (MPDE) systems and ultimately resolve maintenance intensive system concerns. Funding will support developing and installing a high-pressure, electronically-controlled fuel injection rail system. All procurements have been moved to A-2 years prior to installation, vice A-1 year prior to installation, due to actual long lead time material procurements encountered during engineering efforts and schedule planning. LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 36 of 38 P-1 Line #15 Volume 1 - 384 === page 463 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 9 / CJ063 HM&E Mechanical/Auxiliary Mod Common Fuel Rail MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: CJ063 HM&E Mechanical/ Auxiliary Mod Common Fuel Rail B Kits Recurring 1.1.1) CJ063-Common Fuel Rail - NonOrganic 5 / 37.715 (15) Subtotal: Recurring Subtotal: Procurement, All Modification Items / 37.715 - Subtotal: CJ063 HM&E Mechanical/Auxiliary Mod Common Fuel Rail 1 / 8.835 - 5 / 37.715 - / 8.835 2 / 18.023 / 37.715 - / 8.835 / 18.023 - 1 / 8.835 - 2 / 18.023 / 18.023 - - 1 / 9.192 - / - / 9.192 - / - 1 / 9.192 - / - / 9.192 - / - 1 / 9.192 - / 9.192 - 1 / 9.192 - 1 / 9.375 - / - / 9.375 - / - 1 / 9.375 - / - - / - / 9.192 - / 9.375 1 / 9.754 - / - 1 / 9.949 / 9.754 - / - 1 / 9.754 - / - - / 9.754 - / - - / 9.949 - - / 9.949 1 / 9.949 12 / 102.843 / 102.843 - 12 / 102.843 / 102.843 - Installation Modification Item 1 of 1: CJ063 HM&E Mechanical/ Auxiliary Mod Common Fuel Rail - / 4.053 - / 0.982 - / 7.731 - / 11.108 Subtotal: Installation - / 4.053 - / 0.982 - / 7.731 - / 11.108 - / 0.000 - / 11.108 - / 7.939 - / 3.631 - / 4.421 - / 0.007 - / 8.368 - / 48.240 / - - / 11.108 - / 7.939 - / 3.631 - / 4.421 - / 0.007 - / 8.368 - / 48.240 - Total Total Cost (Procurement + Support + Installation) LI 0946 - LPD Class Support Equipment Navy 41.768 9.817 25.754 20.300 0.000 UNCLASSIFIED Page 37 of 38 20.300 17.314 3.631 P-1 Line #15 14.175 0.007 18.317 151.083 Volume 1 - 385 === page 464 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0946 / LPD Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 9 / CJ063 HM&E Mechanical/Auxiliary Mod Common Fuel Rail MDAP/MAIS Code: Modification Item 1 of 1: CJ063 HM&E Mechanical/Auxiliary Mod Common Fuel Rail Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 23 Dates FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates May 2025 Dec 2025 Feb 2027 Dec 2027 FY 2029 Jun 2030 FY 2030 FY 2031 Delivery Dates Apr 2027 Nov 2027 Jan 2029 Nov 2029 May 2032 Installation Information Method of Implementation: [none specified]:: Installation Name: CJ063-Common Fuel Rail Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 1 / 4.053 0 / 0.659 2 / 7.065 2 / 7.102 0 / 0.000 2 / 7.102 - / - - / - - / - - / - 0 / 0.000 5 / 18.879 FY 2025 - / - 0 / 0.323 0 / 0.006 1 / 3.657 0 / 0.000 1 / 3.657 - / - - / - - / - - / - 0 / 0.000 1 / 3.986 FY 2026 - / - - / - 0 / 0.660 0 / 0.012 0 / 0.000 0 / 0.012 2 / 7.590 - / - - / - - / - 0 / 0.000 2 / 8.262 FY 2027 - / - - / - - / - 0 / 0.337 0 / 0.000 0 / 0.337 0 / 0.006 1 / 3.625 - / - - / - 0 / 0.000 1 / 3.968 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 0.343 0 / 0.006 1 / 4.064 - / - 0 / 0.000 1 / 4.413 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - - / - - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.357 0 / 0.007 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 4.374 1 / 4.374 Total 1 / 4.053 0 / 0.007 2 / 8.368 12 / 48.240 Installation Cost 0 / 0.982 2 / 7.731 3 / 11.108 0 / 0.000 3 / 11.108 2 / 7.939 1 / 3.631 / - 1 / 4.421 / - - 1 / 3.994 / - 1 / 4.358 / - - / - Installation Schedule FY 2025 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot 1 - - - - - 1 1 - - - 3 - 1 - 1 - - 1 - - - 1 - - - - - - 2 12 - - - - - - - 1 - - - 3 - - 1 - - - - - - 4 12 In Out FY 2026 PYS - 1 - - - 1 - 1 Footnotes: (15) During FY 2027: (1) kit will be procured for (1) FY 2029 CNO Availability for LPD 21. Also, during FY 2027, (2) kits that were procured in FY2024 will be installed on LPD23 & LPD27 due to CNO availability shifts, and (1) kit procured in FY 2025 will be installed on LPD 24. HM&E Mechanical/Auxiliary Mod Common Fuel Rail requirements are subject to changes in the CNO ship availability schedule. LI 0946 - LPD Class Support Equipment Navy UNCLASSIFIED Page 38 of 38 P-1 Line #15 Volume 1 - 386 === page 465 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0947 / DDG 1000 Class Support Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: 0204202N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 197 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 744.158 744.158 744.158 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 58.284 0.000 58.284 325.668 325.668 325.668 115.267 115.267 115.267 - - - 58.284 0.000 58.284 - - - 58.284 0.000 58.284 165.764 165.764 165.764 175.143 175.143 175.143 212.487 212.487 212.487 To FY 2031 Complete 247.026 247.026 247.026 Total 378.620 2,422.417 378.620 2,422.417 378.620 2,422.417 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 5.033 - - - - - - - - - 5.033 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: DDG 1000, a multi-mission surface combatant, will serve as a versatile asset in the context of future Naval Strategy. Armed with an array of weapons, DDG 1000 will provide the Joint Force Commander with precision strike and volume fires. Designed with sustainable payload, multi-spectral stealth and optimal manning, DDG 1000 will take the fight to the enemy with unprecedented striking power. The program is continuing to integrate the Conventional Prompt Strike (CPS) weapons system onto the Zumwalt class. CPS integration is a top CNO priority that enhances the Navy's lethality by providing a critical hypersonic attack capability to prevail in Great Power competition. This naval surface hypersonic strike capability will allow the Zumwalt class to conduct independent forward deployed operations and prosecute deep-inland, time-critical, soft and medium-hardened targets in a contested environment. Additionally, when combined with the low observable characteristics of the Zumwalt platform, CPS enhances a uniquely lethal and survivable naval surface platform. The Zumwalt Class will enhance U.S. conventional power projection by providing an independent forward deployed strike platform, with longer range, shorter time of flight, and higher survivability against enemy defenses compared to current capabilities. The Navy will integrate CPS into USS Zumwalt (DDG 1000) and USS Michael Monsoor (DDG 1001) during Building Yard Modernization Periods (BYMP) instead of traditional Docking Selected Restricted Availabilities (DSRA). This shipyard period type maximizes learning and efficiency in order to speed the capability to the fleet. The program will integrate CPS into Lyndon B. Johnson (DDG 1002) during new construction, prior to the ship's arrival in homeport and prior to installation of CPS on DDG 1001. Full CPS operational capability on Zumwalt Class is achieved once CPS is installed in all three ships and they are turned over for Fleet operations. DDG 1000 and DDG 1001 are commissioned ships and the CPS installations for these ships is budgeted with Other Procurement, Navy (OPN) funding. DDG 1002 CPS installation is budgeted in Shipbuilding & Conversion, Navy (SCN) funding. Advanced Payload Modules (APM) are interchangeable end items and are budgeted in OPN. The program provides for DDG 1000 combat system hardware/equipment suite technology refresh to support obsolescence management and address reliability, maintainability & availability (RM&A) issues following fielding. Combat System hardware will be over a decade obsolete at the time of delivery. Active management of commercial off-the-shelf (COTS) obsolescence via hardware/equipment technology refresh will be required to ensure Zumwalt class ships reach their design service life. Additionally, the program will sustain and upgrade in-service Zumwalt ships in order to achieve their Expected Service Life (ESL). Upgrades will be mission capable in countering current and projected threats, improve operational capabilities, and comply with requirements. The program will start procuring combat system elements in support of the Zumwalt Enterprise Upgrade Solution (ZEUS). This funding fully modernizes the Zumwalt Combat System to increase commonality, lethality, and sustainability for the ship class. Specific hardware systems upgrades include SPY-3 to SPY-6(v)3, Mk41 common electronics to interface with the Mk57 Peripheral Vertical Launch System (PVLS), LI 0947 - DDG 1000 Class Support Equipment Navy UNCLASSIFIED Page 1 of 19 P-1 Line #16 Volume 1 - 387 === page 466 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0947 / DDG 1000 Class Support Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: 0204202N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 197 DDG-1000 adapted CANES suite, Identification Friend or Foe (IFF), Maritime Strike Tomahawk (MST), Cooperative Engagement Capability (CEC) block 2, and SLQ-32 computing hardware. Target install availabilities begin in FY31 and beyond. Without investment into ZEUS, the ship class will continue to experience missile inventory issues, incur significant obsolescence shortfalls in PVLS and SPY-3 systems, require unique manning and training funding profiles, and require significant software development to keep pace with the threat environment. [P40A / DDG 1000 Class Product Improvement]: Funding provides engineering changes to the Combat System necessary to address component obsolescence, recurring cybersecurity requirements and a 20-module SM-6 capability on DDG 1000, during her BYMP. This effort develops or updates drawings and technical documentation, develops work specifications and technical documentation to integrate planned changes into the baseline design. Material will be procured, kitted, delivered and installed on the ship. Planning, prioritization and installation of ship alterations (ShipAlts) will be done during maintenance availability periods within the Fleet Modernization Program. Logistics product updates are provided to ensure latest ship's crew proficiency and understanding. Funding also supports software licenses and associated cyber security hardware, necessary to prevent vulnerabilities. Procures shipboard assets as well as Zumwalt Training Facility updates, to maintain similar configuration. [P40A / Critical Cybersecurity Upgrades and Improvements]: The TSCE integrates all the ship's sensors and weapons into a cohesive Combat System (CS). Funding is required for engineering and hardware procurement to support Windows 10 Upgrade, Linux Kernel Integrity Validation tool, and Secure Data Distribution Services. Windows 10 upgrade is necessary to prevent cyber security vulnerabilities and is mandated by OPNAV requirements. Linux Kernel Integrity Validation provides methods for detecting malicious activity (including "Zero-day" attacks) in order to keep pace with ongoing threats. Secure Data Distribution Services provides detection and countermeasure capabilities to ensure data confidentiality and integrity. Funding supports procurement of shipboard assets for deployment capability and configuration alignment with the ZUMWALT Training Facility. [P40A / TSCE Diminishing Manufacturing Sources & Material Shortages (DMSMS)]: FY24 funding supports DDG 1002's SPY-3 refurbishment, including procurement and replacement of failed or obsolescent materiel. DDG 1002's SPY-3 array was previously utilized on self-defense test ship, requiring refurbishment prior to install on DDG 1002. FY25 OPN funding is required to procure ZUMWALT Class ships network and computing equipment to address obsolescence and DMS concerns to sustain the ZUMWALT Class TSCE and minimize total operation costs. Funding is required to maintain ship readiness; without funding, obsolescence in ZUMWALT Class network and computing environments will impact the ship's ability to get underway and decrease capacity for sparing. Non-recurring engineering (NRE) is based on SD-22 solution costs adjusted for inflation for current and predicted obsolescence. Funding for TSCE DMSMS funds projected and unplanned DMSMS Cases, both life of type buy and redesign of major components within TSCE. Current DMSMS percentage of the TSCE configuration is 85-95% obsolete. DMSMS cases will increase in severity as components within the system become end of life. The current configuration requires support through FY27 until TSCE modernization commences on the final ship. [P40A / TSCE Modernization Engineering]: Combat system computing infrastructure (data centers, network infrastructure & communications devices) is more than a decade old and requires extensive modernization and technology refresh to sustain operations, mitigate obsolescence, provides a hardware baseline and software development processes that align to Integrated Combat System efforts. Funding provides non-recurring engineering labor necessary for integration, testing, and deployment of new computing hardware and peripherals. FY23 funded software architecture development to adapt the combat system software to the upgraded hardware configuration. The increase in FY24 funds detailed design of hardware configuration, migration of the software baseline into a containerized architecture, and lab integration of modified software with new hardware, as well as software and hardware engineering to address any issues discovered during testing. Thorough lab integration is required prior to installation of shipboard equipment starting in FY25. The Zumwalt-class Operational Availability (Ao), as specified in the Operational Requirements Document (ORD), is the driving requirement for TSCE modernization. Additionally, the program is procuring life-type buys to support the ships through the start of DDG 1001 availability in FY26. [P40A / TSCE Moderization Lab Equipment]: Funding completes installation of Zumwalt Training Facility. Funding procures and installs lab equipment assets to support full reachback capability to government (located at NSWCDD) and contractor laboratories [P40A / TSCE Modernization Procurement]: Follow-on TSCE modernization procurement for DDG 1000 is planned in FY28. TSCE Modernization hardware procurements are phased based on the 20-month procurement lead time. [P40A / HM&E Land Based Test Environment (LBTE)]: Procure material and equipment for LBTE will lead to greater understanding and competency for DDG 1000 controls systems and will lead to less dependency on the Original Equipment Manufacturer (OEM) to provide life-cycle support for hardware, software and cyber security. LI 0947 - DDG 1000 Class Support Equipment Navy UNCLASSIFIED Page 2 of 19 P-1 Line #16 Volume 1 - 388 === page 467 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0947 / DDG 1000 Class Support Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: 0204202N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 197 [P40A / Data Center Lab (Combat System Maintenance and Hardware)]: Funding is to populate the contractor's software development lab with tactical element hardware and to establish a government integration lab. Currently the contractor's lab is utilizing DDG 1002 assets (SGS/AC, CDLMS/NGC2P, IFF, etc.), which will be removed to support DDG 1002 combat system installation during the combat availability. To maintain the contractor lab capability, additional hardware will need to be procured. [P40A / Electro-Optical / Infrared (EO/IR) Sensor]: DDG 1000 is a low radar cross section (RCS) vessel that utilizes EO/IR tactically. In conjunction with NAVSEA 05 and the Technical Warrant Holder (TWH), conducted a study of available EO/IR sensors and have selected the compliant sensor available to meet both the RCS and EO/IR functional requirements of DDG 1000. [P40A / C4I (Business) Network Sustainment]: TSCE includes a C4I (business) network, which currently resides on an unsupportable Windows 7 operating system with no sustainment plan in place. Funding will upgrade the current C4I (business) network from Windows 7 to Windows 10, procure licenses, and replace laptops. Critical Cyber security Upgrades and Improvements funded the upgrade of the TSCE to Windows 10. This did not fund upgrades to any of the applications that utilize the TSCE network such as COMPOSE 4.0.1, GCCS-M, NGC2P, etc. Since there is no program of record support for COMPOSE 4.0.1 as installed on DDG 1000, this funds an upgrade to COMPOSE 4.0.1 to Windows 10, and provides a sustainment path for this system. [P40A / Radar Absorbing Material (RAM) and Composite Sustainment]: Recurring OPN is required to procure, install and repair RAM on board the DDG 1000 Class. [P40A / MK 57 CEU Technical Development Package]: Funding required for engineering development efforts to prepare and approve the DDG 1000 class MK57 universal canister electrical unit (UCEU) technical data package (TDP). The TDP is necessary to issue a build-to-print request for proposal to industry, for development and test the UCEU hardware. Naval Surface Warfare Center Dahlgren will be the primary activity developing the TDP. The procurement and testing of the UCEU will be funded from OPN LI 5231 Ship Missile Support Equipment. [P40A / Common Electric Module Shock Kits]: Common Electric Module Shock Kits (CEMs) - Shock kits procured in FY21 to support CEM upgrade from obsolete version 2.1 to 4.0. These shock kits were necessary to ruggedize the new CEM 4.0 modules within the enclosure. CEM 4.0 upgrade has since been implemented across the class, and now gives the crew ability to sustain the Common Display System, operate and maintain the TSCE system, and continue activation of the ZUMWALT combat system. [P40A / MK 57 VLS ELECTRONICS DDG 1000 and CSSQT]: FY28 funds procure last shipset of Mk57 Vertical Launch System Electronics for DDG 1000, and completes Combat Systems Ship Qualification Trials (CSSQT). [P40A / DDG 1000 SM-6 Integration]: Integration of SM-6 capability. Funding required for TSCE Integration (OPN), testing, and Live Fire Testing (RDT&E). Funding will procure the Vertical Launch System Global Positioning System Integration (VGI) components for the necessary ephemeris data. [P40A / DDG 1000 NTCDL Integration]: Upgrade Tactical Common Data Link (TCDL) to Network Tactical Common Data Link (NTCDL) by removing TCDL from the ship's 07-level and replacing with deckhouse mounted NTCDL. TCDL is a Commercial Off-The-Shelf (COTS) antenna which Naval Information Warfare Systems Command supports whereas NTCDL is a full program of record. Will increase capacity for Common Data Link (CDL) links, as well as freeing up 07-level space and improving RCS to allow for installation of other antennas. Improves signature and increases capacity of CDL links. [P40A / DDG 1000 SPECTRAL Integration]: Spectral is the next generation Information Warfare weapons system enhancing signals exploitation capabilities. Spectral is scalable, mission-configurable, and modular to rapidly respond to new threats or capabilities. A stronger, faster, integrated capability enables data sharing with other systems to support Electromagnetic Maneuver Warfare (EMW)/Integrated Fires (IF). Spectral detects, classifies, and tracks Signals of Interest (SOI) beyond current stated requirements to improve automation, operability, and intuitiveness in the Tasking, Collection, Processing, Exploitation, and Dissemination (TCPED) process. Agile software methodology ensures flexibility in meeting emergent requirements and addressing Fleet user priorities [P40A / Zumwalt Enterprise Upgrade Solution]: FY29 funding supports hardware procurements and Ship Installation Drawing preparation. Specific hardware systems upgrades include SPY-3 to SPY-6(v)3, Mk41 common electronics to interface with the Mk57 Peripheral Vertical Launch System (PVLS), a DDG-1000 adapted CANES suite, Identification Friend or Foe (IFF) to use UPX-41 transreceiver, Maritime Strike Tomahawk (MST) to support BLK V TLAM capability, Cooperative Engagement Capability (CEC) block 2, and SLQ-32 computing infrastructure hardware for BL12/V(6) compatible suite. Target install availabilities begin in FY31 and beyond. Funding profile extends past FYDP and notionally supports complete installation of all ships by FY34. LI 0947 - DDG 1000 Class Support Equipment Navy UNCLASSIFIED Page 3 of 19 P-1 Line #16 Volume 1 - 389 === page 468 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0947 / DDG 1000 Class Support Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: 0204202N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 197 [P40A / HW/SW HM&E Mod, Obsolescence Mitigation & Design Improvements]: Funding required for material and software procurements for High Voltage, Low Voltage, Propulsion/Power Generation, Auxiliary, Seawater/Freshwater Cooling, Deck, Damage Control, and Steering Gear system alterations in support of obsolescence mitigation and design improvements. [P40A / HM&E Modernization Alterations Installation]: Fund installation costs for High Voltage, Low Voltage, Propulsion/Power Generation, Auxiliary, Seawater/Freshwater Cooling, Deck, Damage Control, and Steering Gear system alterations in support of obsolescence mitigation and design improvements. [P3A / Conventional Prompt Strike]: Perform shipbuilder procurements and modifications for installation of CPS on DDG 1000 Class. To include planning, design, removal forward and aft Advanced Gun Weapons System (MT61 and MT62 respectively), HM&E material, combat system integration, and procurement/installation of advanced payload modules. LI 0947 - DDG 1000 Class Support Equipment Navy UNCLASSIFIED Page 4 of 19 P-1 Line #16 Volume 1 - 390 === page 469 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0947 / DDG 1000 Class Support Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: 0204202N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 197 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code P-5a, P-21 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a DDG 1000 Class Support Equipment - / 323.587 - / 74.545 - / 17.122 - / 11.598 / - - / 11.598 P-3a 1 / Conventional Prompt Strike (TBD) - / 420.571 - / 251.123 - / 98.145 - / 46.686 - / 0.000 - / 46.686 P-40 Total Gross/Weapon System Cost - / 744.158 - / 325.668 - / 115.267 - / 58.284 - / 0.000 - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code - / 58.284 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a DDG 1000 Class Support Equipment P-3a 1 / Conventional Prompt Strike (TBD) P-5a, P-21 - - / 20.300 / - P-40 Total Gross/Weapon System Cost - / 165.764 - / - - / 0.000 / 175.143 - / - - / 0.000 / 212.487 - / - - / 0.000 / 247.026 - / - - / 0.000 / 378.620 - / / 836.825 / 2,422.417 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY26 to FY27 decrease is due to long lead material procurements in support of the DDG 1001 BYMP being completed in FY26. The program is proceeding with Conventional Prompt Strike (CPS) installation on DDG 1000 and DDG 1001 during Build Yard Modernization Periods (BYMPs), which will replace the previously scheduled Docking Selected Restricted Availabilities (DSRAs). The DDG 1000 BYMP began execution in FY24 and the DDG 1001 BYMP will begin execution in FY26. To support the BYMPs, the program established a sole-source contract with Huntington Ingalls Industries (HII) for production planning and execution. DDG 1002 procurement and installation costs for CPS are included in SCN for that hull. TSCE Critical Cybersecurity Upgrades and Improvements funding is required for engineering and hardware procurement to support Windows 10 Upgrade, Linux Kernel Integrity Validation tool, and Secure Data Distribution Services. Validation provides methods for detecting malicious activity (including "Zero-day" attacks) in order to keep pace with ongoing threats. Secure Data Distribution Services provides detection and countermeasure capabilities to ensure data confidentiality and integrity. TSCE DMSMS Existing DDG 1000 and follow hardware is more than a decade obsolete. Efforts includes NRE required to identify and qualify applicable obsolete parts, prepare drawing updates (Lowest Replaceable Unit (LRU) & cabinet level), prepare Integrated Logistics Support (ILS) updates (LRU & cabinet level) and procure replacement parts. DMSMS procurements are necessary until DDG 1001 commences TSCE Modernization in FY27 (hardware procurement in FY25). LI 0947 - DDG 1000 Class Support Equipment Navy UNCLASSIFIED Page 5 of 19 P-1 Line #16 Volume 1 - 391 === page 470 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0947 / DDG 1000 Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: DDG 1000 Class Support Equipment FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) DDG 1000 CLASS SUPPORT EQUIPMENT 1.1) DDG 1000 Class On Board Trainer A 1.2) DDG 1000 Class Operating System Refresh A Subtotal: 1) DDG 1000 CLASS SUPPORT EQUIPMENT 10,667K 3 32.000 - - - - - - - - - - - - - - - - - 29.735 - - - - - - - - - - - - - - - - - 61.735 - - - - - - - - - - - - - - - - - 1.400 - - - - - - - - - - - - - - - - - 1.400 - - - - - - - - - - - - - - - - - 17.201 - - 0.349 - - - - - - - - - - - - - - 17.739 - - 2.861 - - 2.044 - - 1.900 - - - - - 1.900 - - 4.865 - - - - - - - - - - - - - - - - - 46.108 - - 8.935 - - 10.578 - - 3.900 - - - - - 3.900 - - 40.357 - - 2.000 - - 2.000 - - - - - - - - - 59.660 - - - - - - - - - - - - - - - 57.500 - - - - - - - - - - - - 2) DDG 1000 CLASS SUPPORT 2.1) Production Engineering A Subtotal: 2) DDG 1000 CLASS SUPPORT 3) DDG 1000 CLASS HM&E PRODUCT IMPROVEMENT 3.1) DDG 1000 Class Product Improvement A 3.2) Critical Cybersecurity Upgrades and Improvements A 3.3) Common Display System A 3.4) TSCE Diminishing Manufacturing Sources & Material Shortages (DMSMS) A 3.5) TSCE Modernization Engineering A 3.6) TSCE Moderization Lab A (1) (†) Equipment 3.7) TSCE Modernization Procurement A (2)(†) 3.8) HM&E Land Based Test Environment (LBTE) A 3.9) Data Center Lab (Combat System Maintenance and Hardware) A 19,887K - 3 - - 57,500K 1 1,529K 1 1.529 - - - - - - - - - - - - - - - 4,247K 2 8.494 - - - - - - - - - - - - - - - LI 0947 - DDG 1000 Class Support Equipment Navy UNCLASSIFIED Page 6 of 19 P-1 Line #16 Volume 1 - 392 === page 471 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0947 / DDG 1000 Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 3.10) Electro-Optical / Infrared (EO/IR) Sensor A 3.11) C4I (Business) Network Sustainment A 3.12) Radar Absorbing Material (RAM) and Composite Sustainment A 3.13) MK 57 CEU Technical Development Package A 3.14) Common Electric Module Shock Kits A MAIS Code Unit Cost ($) Qty (Each) 5,084K FY 2025 Total Cost Unit Cost ($ M) 3 ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: DDG 1000 Class Support Equipment FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 15.252 - - - - - - - - - - - - - - - - - 16.900 - - 1.400 - - 1.500 - - - - - - - - - - - 4.800 - - 1.500 - - 1.000 - - - - - - - - - - - 4.000 - - - - - - - - - - - - - - - - - 5.700 - - - - - - - - - - - - - - - - - 242.605 - - 74.545 - - 17.122 - - 5.800 - - - - - 5.800 - - 5.200 - - - - - - - - - - - - - - - - - 1.100 - - - - - - - - - - - - - - - 11.547 - - - - - - - - - - - - - - - - 17.847 - - - - - - - - - - - - - - - - - - - - - - - - - - 5.798 - - - - - 5.798 Subtotal: 6) DDG 1000 Class HM&E Sustainment and Modernization - - 0.000 - - - - - - - - 5.798 - - - - - 5.798 Total - - 323.587 - - 74.545 - - 17.122 - - 11.598 - - - - - 11.598 Subtotal: 3) DDG 1000 CLASS HM&E PRODUCT IMPROVEMENT 4) DDG 1000 SURFACE STRIKE 4.1) DDG 1000 SM-6 Integration A 4.2) DDG 1000 NTCDL Integration A 4.3) DDG 1000 SPECTRAL Integration A Subtotal: 4) DDG 1000 SURFACE STRIKE 3,849K - 3 6) DDG 1000 Class HM&E Sustainment and Modernization 6.1) HW/SW HM&E Mod, Obsolescence Mitigation & Design Improvements A (3) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) DMSMS funding will be used to execute life of type buys (LTBs) and develop ECP/redesign work-arounds to keep the system's legacy configuration running on the remaining ships while they await TSCE Modernization. DMSMS cases are predicted to increase in severity each year as components within the system continue to approach end of life. Legacy configuration HW will require support through timeframe until TSCE modernization commences on the final ship. These LCEM 4.0 modules were recently discovered to have an estimated end-of-life date within the next couple years. Since TSCE Mod will not be upgrading these LCEMs, an LTB will need to be executed to keep the 4.0 LCEMs supported until a new CEM/CDS design is available in about 10 years. LI 0947 - DDG 1000 Class Support Equipment Navy UNCLASSIFIED Page 7 of 19 P-1 Line #16 Volume 1 - 393 === page 472 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 (2) (3) P-1 Line Item Number / Title: 0947 / DDG 1000 Class Support Equipment Aggregated Items Title: DDG 1000 Class Support Equipment TSCE modernization procurement for DDG 1001 occurred in FY25; the Navy is currently assessing the plan for DDG 1000. TSCE Modernization hardware procurements are phased based on the 23 month procurement lead time. FY27 HW/SW HM&E Mod, Obsolescence Mitigation & Design Improvements funding was increased across the FYDP to implement engineering solutions to maintain sustainment to DDG 1000 Class and to procure and install material for implementation of resolutions to obsolete equipment critical to maintaining operational availability in support of Conventional Prompt Strike capabilities. LI 0947 - DDG 1000 Class Support Equipment Navy UNCLASSIFIED Page 8 of 19 P-1 Line #16 Volume 1 - 394 === page 473 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 0947 / DDG 1000 Class Support Equipment Contractor and Location Method/Type or Funding Vehicle Raytheon / Tewksbury, MA 2023 Aggregated Items: DDG 1000 Class Support Equipment Location of PCO Award Date Date of First Delivery C / FFP WNY Mar 2023 Aug 2024 1 18,500K N Apr 2022 Raytheon / Tewksbury, MA C / FFP WNY Mar 2023 Aug 2024 1 21,500K N Apr 2022 2024 Raytheon / Tewksbury, MA C / FFP WNY Mar 2024 Aug 2025 1 19,660K N 2025 Raytheon / Tewksbury, MA C / FFP NAVSEA Oct 2024 Sep 2026 1 57,500K N FY Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 3) DDG 1000 CLASS HM&E PRODUCT IMPROVEMENT 3.6) TSCE Moderization Lab (†) Equipment 3.6) TSCE Moderization Lab (†) Equipment 3.6) TSCE Moderization Lab (†) Equipment 3.7) TSCE Modernization Procurement (†) (2)(†) 2022 (4) Sep 2024 Sep 2022 indicates the presence of a P-21 Footnotes: (4) Funding provides network and data center equipment at both the OEM lab and the Zumwalt Training Facility to represent the tactical configuration for the purposes of integration, testing, support, and training. Network equipment encompasses routers, switches, wireless access points, and a variety of audio/visual peripherals for communication and security. Data center equipment includes core processing, data storage, and encryption devices. FY22 includes 1 Network lab set, 1 Data Center lab set. FY23 includes 1 spares for lab network, 1 spares for data center, 1 data center for training facility. FY24 includes 1 Network lab set, 1 Data Center lab set. LI 0947 - DDG 1000 Class Support Equipment Navy UNCLASSIFIED Page 9 of 19 P-1 Line #16 Volume 1 - 395 === page 474 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0947 / DDG 1000 Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: DDG 1000 Class Support Equipment Fiscal Year 2023 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 3) DDG 1000 CLASS HM&E PRODUCT IMPROVEMENT 3.6) TSCE Moderization Lab Equipment 1 2022 NAVY 1 0 1 A - - - - - - - - - - - - - - - - - 1 1 2023 NAVY 1 0 1 A - - - - - - - - - - - - - - - - - 1 1 2024 NAVY 1 0 1 A - - - - - 0 1 3.7) TSCE Modernization Procurement 2 2025 NAVY 1 0 0 - - 1 (2) 1 O C T N O V LI 0947 - DDG 1000 Class Support Equipment Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 19 S E P O C T N O V D E C J A N F E B P-1 Line #16 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 396 === page 475 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0947 / DDG 1000 Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: DDG 1000 Class Support Equipment Fiscal Year 2025 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 3) DDG 1000 CLASS HM&E PRODUCT IMPROVEMENT 3.6) TSCE Moderization Lab Equipment 1 2022 NAVY 1 1 0 1 2023 NAVY 1 1 0 1 2024 NAVY 1 0 1 - 0 1 A - 3.7) TSCE Modernization Procurement 2 2025 NAVY 1 0 0 - - - - - - - - - 1 0 (2) O C T N O V LI 0947 - DDG 1000 Class Support Equipment Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 19 S E P O C T N O V D E C J A N F E B P-1 Line #16 M A R A P R M A Y J U N J U L A U G 1 S E P Volume 1 - 397 0 === page 476 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0947 / DDG 1000 Class Support Equipment Production Rates (Each / Year) MFR Ref # Aggregated Items: DDG 1000 Class Support Equipment Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 1 Raytheon - Tewksbury, MA TBD 0 0 17 17 0 0 14 14 2 Raytheon - Tewksbury, MA TBD 0 0 23 23 0 0 23 23 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0947 - DDG 1000 Class Support Equipment Navy UNCLASSIFIED Page 12 of 19 P-1 Line #16 Volume 1 - 398 === page 477 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0947 / DDG 1000 Class Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / Conventional Prompt Strike MDAP/MAIS Code: Prior Years 420.571 420.571 420.571 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 98.145 46.686 0.000 46.686 20.300 0.000 0.000 0.000 0.000 251.123 251.123 251.123 To FY 2031 Complete - - - - - - - - - 98.145 46.686 0.000 46.686 20.300 0.000 0.000 0.000 0.000 - - - - - - - - - 98.145 46.686 0.000 46.686 20.300 0.000 0.000 0.000 0.000 Total 836.825 836.825 836.825 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: FY27 Conventional Prompt Strike (CPS) Shipbuilding, Support, and Installation funding will support work specs for Advanced Gun System (AGS) removal, CPS HM&E modifications, and identifying CPS space requirements. The planning yard will address arrangements, primary structure, and existing distributive system impacts and reconstruction. FY26 to FY27 decrease is due to long lead material procurements in support of the DDG 1001 BYMP being completed in FY26. [CPS - Advanced Payload Modules] The production lead time for APMs is 30 months. Delivery schedule for APMs will be in 3 month intervals based on ability to achieve desired industrial capacity. The installation period required for APMs can occur during windows of opportunity for the designated ship. Unit Cost Increase on FY25 and FY26 APMs due to inflation and commodity price volatility. [AGS Removal, CPS HM&E Modifications, Shore Support Services] Will support work specs for Advanced Gun System (AGS) removal and identifying CPS space requirements. The planning yard shall address arrangements, primary structure, and existing distributive system impacts and reconstruction. In addition, this funding will provide waterfront support and installation teams across industry and government. Contract Award for DDG 1000 Build Yard Modernization Period (BYMP) occurred on December 27, 2023. The industry yard for the BYMP is Huntington Ingalls Industries - Ingalls Shipbuilding located in Pascagoula, MS. FY26-28 funding - DDG 1001 LI 0947 - DDG 1000 Class Support Equipment Navy UNCLASSIFIED Page 13 of 19 P-1 Line #16 Volume 1 - 399 === page 478 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0947 / DDG 1000 Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Conventional Prompt Strike MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: 0204202N FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 2: Conventional Prompt Strike Shipbuilding B Kits Non-Recurring 1.1.1) Rubber Boots, Shock Isolation, Hatches NonOrganic 4 / 15.900 (5) 1.1.2) Launcher Tubes - NonOrganic 8 / 39.780 (6) 1.1.3) CPS HM&E Material - NonOrganic 4 / 16.544 (7) Subtotal: Non-Recurring Subtotal: Conventional Prompt Strike - Shipbuilding - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 8 / 32.444 - / - - / - - / - - / - - / - - / - - / - - / - - / - 8 / 39.780 - / 38.788 - / 36.510 - / 2.530 - / - - / - - / - - / - - / - - / - - / - - / 94.468 - / 53.054 - / 2.530 - / - - / - - / - - / - - / - - / - - / - - / - 12 / 94.468 4 / 53.054 - / 2.530 - / - - / - - / - - / - - / - - / - - / - - / - 16 / 150.052 5 / 142.000 3 / 100.200 - / - - / - - / - - / - - / - - / - - / - - / - - / - 8 / 242.200 / 100.200 - / - - / - - / - - / - - / - - / - - / - - / - 3 / 100.200 - / - - / - - / - - / - - / - - / - - / - - / - / 2.530 - / - - / - - / - - / - - / - - / - - / - / 0.000 - - / 77.828 / 150.052 - Modification Item 2 of 2: Conventional Prompt Strike Advanced Payload Modules B Kits Non-Recurring 2.1.1) CPS - Advanced Payload Modules - NonOrganic (8) Subtotal: Non-Recurring Subtotal: Procurement, All Modification Items / 142.000 - Subtotal: Conventional Prompt Strike - Advanced Payload Modules - 5 / 142.000 - / 236.468 / 153.254 - / 170.453 - / 83.719 - / 95.615 - / 46.686 - / - - / 46.686 - / 20.300 - / - - / - - / - - / 170.453 - / 83.719 - / 95.615 - / 46.686 - / - - / 46.686 - / 20.300 - / - - / - - / - / 12.400 - / 12.900 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 1.250 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - - - / 0.000 - / 242.200 - / - 8 / 242.200 / 0.000 - / 392.252 / - - / 416.773 - / 0.000 - / 416.773 / 0.000 - / 0.000 / 0.000 - / 0.000 / - - / 0.000 - Support (All Modification Items) 3.1) AGS Removal, CPS HM&E Modifications, Shore Support Services Subtotal: Support - Installation Modification Item 1 of 2: Conventional Prompt Strike Shipbuilding - Modification Item 2 of 2: Conventional Prompt Strike Advanced Payload Modules Subtotal: Installation - / 1.250 / 13.650 - / 14.150 - / - - / - - / - - / - - / - - / - - / - - - / 25.300 - - / 2.500 / 27.800 Total LI 0947 - DDG 1000 Class Support Equipment Navy UNCLASSIFIED Page 14 of 19 P-1 Line #16 Volume 1 - 400 === page 479 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0947 / DDG 1000 Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 1 / Conventional Prompt Strike FY 2025 FY 2026 Related RDT&E PEs: 0204202N FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost (Procurement + Support + Installation) LI 0947 - DDG 1000 Class Support Equipment Navy 420.571 251.123 98.145 46.686 0.000 UNCLASSIFIED Page 15 of 19 46.686 20.300 0.000 P-1 Line #16 0.000 0.000 0.000 836.825 Volume 1 - 401 === page 480 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0947 / DDG 1000 Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Conventional Prompt Strike MDAP/MAIS Code: Modification Item 1 of 2: Conventional Prompt Strike - Shipbuilding Manufacturer Information Manufacturer Name: BIW Manufacturer Location: Bath, Maine Administrative Leadtime (in Months): 0 Production Leadtime (in Months): 18 Dates FY 2025 Contract Dates Oct 2024 Delivery Dates Mar 2026 FY 2026 FY 2027 FY 2028 Manufacturer Name: Bath Iron Works (BIW)Name FY 2030 FY 2031 FY 2030 FY 2031 Manufacturer Location: Bath, Maine Administrative Leadtime (in Months): 0 Dates FY 2029 Production Leadtime (in Months): 24 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Delivery Dates Installation Information Method of Implementation: Build Yard Modernization Period:: Installation Name: Rubber Boots, Shock Isolation, Hatches Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - Prior Years 4 / 6.200 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 4 / 6.200 FY 2025 - / - 0 / 6.450 - / - 4 / 0.000 / - 0 / 0.000 - / - 4 / 0.000 - / - - / - - / - - / - 0 / 0.000 4 / 6.450 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 4 / 6.200 0 / 6.450 - / - 4 / 0.000 4 / 0.000 - / - - / - - / - - / - 0 / 0.000 0 / 0.000 8 / 12.650 Installation Schedule FY 2025 FY 2026 FY 2027 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 In 4 - - - - - - - - - Out 4 - - - - - - - - - LI 0947 - DDG 1000 Class Support Equipment Navy FY 2028 FY 2029 FY 2030 FY 2031 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot 4 - - - - - - - - - - - - - - - - - - - 8 - - - - - - - - - - - - - - - - - 8 - - 4 UNCLASSIFIED Page 16 of 19 P-1 Line #16 Volume 1 - 402 === page 481 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0947 / DDG 1000 Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Conventional Prompt Strike MDAP/MAIS Code: Modification Item 1 of 2: Conventional Prompt Strike - Shipbuilding Installation Information Method of Implementation: Build Yard Modernization Period (BYMP):: Installation Name: Launcher Tubes Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 4 / 6.200 4 / 6.450 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 8 / 12.650 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 4 / 6.200 4 / 6.450 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Installation Cost 8 / 12.650 Installation Schedule FY 2025 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot 4 4 - - - - - - - - - - - - - - - - - - - - - - - - - - - - 8 - - - - - - - - - - - - - - - - - - - - - - - - - 8 In Out FY 2026 PYS - - 4 - 4 LI 0947 - DDG 1000 Class Support Equipment Navy UNCLASSIFIED Page 17 of 19 P-1 Line #16 Volume 1 - 403 === page 482 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0947 / DDG 1000 Class Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / Conventional Prompt Strike MDAP/MAIS Code: Modification Item 2 of 2: Conventional Prompt Strike - Advanced Payload Modules Manufacturer Information Manufacturer Name: Lockheed Martin Manufacturer Location: Manassas, Virginia Administrative Leadtime (in Months): 0 Production Leadtime (in Months): 30 Dates FY 2025 FY 2026 Contract Dates Oct 2024 Delivery Dates May 2027 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: BYMP and WOO's:: Installation Name: CPS - Advanced Payload Modules Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 0 / 1.250 - 4 / 0.000 1 / 0.000 0 / 0.000 1 / 0.000 - / - - / - - / - - / - 0 / 0.000 5 / 1.250 FY 2025 - / - 0 / 1.250 / - - / - 1 / 0.000 0 / 0.000 1 / 0.000 2 / 0.000 - / - - / - - / - 0 / 0.000 3 / 1.250 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 0 / 1.250 2 / 0.000 - / - - / - - / - 0 / 0.000 0 / 1.250 4 / 0.000 2 / 0.000 0 / 0.000 2 / 0.000 8 / 2.500 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - 1 1 1 1 1 - - 1 1 1 - - - - - - - - - - - - - - - 8 Out - - - - - 1 1 1 1 1 - - 1 1 1 - - - - - - - - - - - - - - - 8 Footnotes: (5) (6) (7) Rubber Boots, Shock Isolation, and hatches Procurement and Installation is funded in the year of the BYMP contract award. DDG 1000 awarded in FY23 and DDG 1001 is expected to award in FY25. DDG 1001 Tubes Procured in FY23 and installation funding is budgeted in FY25 to align with BYMP contract in FY25. DDG 1002 Tubes will be procured with SCN funding in FY24. HM&E Government furnished materials (GFM) and Industrial Activity Furnished Materials required to support CPS integration. LI 0947 - DDG 1000 Class Support Equipment Navy UNCLASSIFIED Page 18 of 19 P-1 Line #16 Volume 1 - 404 === page 483 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0947 / DDG 1000 Class Support Equipment ID Code (A=Service Ready, B=Not Service Ready) : (8) Modification Number / Title: 1 / Conventional Prompt Strike MDAP/MAIS Code: Installation funding is budgeted in the year of the BYMP contract award. LI 0947 - DDG 1000 Class Support Equipment Navy UNCLASSIFIED Page 19 of 19 P-1 Line #16 Volume 1 - 405 === page 484 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 406 === page 485 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0950 / Strategic Platform Support Equip Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 147.119 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 147.119 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 147.119 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 53.931 38.039 72.163 0.000 72.163 78.687 64.208 55.369 - - - - - - - - 53.931 38.039 72.163 0.000 72.163 78.687 64.208 55.369 To FY 2031 Complete - Total - 57.632 Continuing - Continuing - 57.632 Continuing - Continuing - - - - - - - - - - 53.931 38.039 72.163 0.000 72.163 78.687 64.208 55.369 57.632 Continuing Continuing 0.140 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - 0.051 - 0.051 0.076 0.077 0.151 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Funding in this P-1 line provides for the procurement of tactical Hull, Mechanical and Electrical (HM&E) equipment that will be installed aboard ships and in the facilities at the TRIDENT Refit Facility (TRF), Navy Intermediate Maintenance Facility (IMF) and TRIDENT Training Facility (TTF). TRF and Navy IMF are dedicated shore support facilities providing a full range of industrial support. TTF provides realistic training experience in operating and maintaining shipboard equipment for the OHIO Class (SSBN/SSGN) Submarines crews. SSBN/SSGN Submarines operate with two separate crews and TTF is critical in maintaining proficiency and certification for continued at-sea operations when not underway. The magnitude of this funding line is driven by the operational need for modernization and safety alterations. Funding in FY27 supports Strategic Weapons Support Systems (SWSS) Replacement of Hull Keel Depth Transducers for modernization of OHIO Class Hovering and Compensation Systems and modernization of the Missile Dehumidification and Drying Machine. Funding in FY27 also provides additional funding for Passive Fire Protection to wrap Missile Tubes on an additional hull in order to mitigate the potential impact caused by a Missile Compartment Thermal Event. FY27 also funds TRIDENT Load List Range/Depth Additions and Extended Refit Period (ERP) Long Lead Time Material procurements to support SSBN 741's ERP. HM&E Modernization funding enables PMS396 to respond to fleet requests for HM&E modernization for safety and reliability alterations. Funding allows for continued operation and increased supportability of systems, such as Obsolete Equipment Replacement for Ship Control Subsystem upgrades, Life Support Systems upgrades, Torpedo Tube Fiber Optic Interface Upgrade, SSBN TRIDENT Planned Equipment Replacement Program (TRIPER) Obsolescence, SSBN Emergency Diesel Generator (EDG), EDG Rotatable Pool program, and Emergency Diesel Generator Control Panel (DGCP). Funding in this P-1 line also provides funding for Non-Propulsion Electronics Equipment (NPES) that will be installed aboard TRIDENT Class submarines as part of the Obsolete Equipment Replacement (OER) Program. Beginning in FY25, all requirements are re-aligned under Budget Line Item 0950 due to the zero-sum transfer of funds from Budget Line Item 2676 into 0950. OER Program is the replacement of existing hardware/software that, though functional, has become operationally obsolete, is no longer in production or supportable with spare parts, or has a high failure rate making them no longer cost effective to maintain. OER hardware/software changes are expected to provide significant cost savings via reduced maintenance costs and use Commercial-Off-The-Shelf (COTS) technology wherever possible as long as all technical requirements are met. This funding line includes performance of the required fully integrated system level testing and certification of changes to the TRIDENT Combat systems prior to installation of the changes on the ship. Integrated testing and certification provide assurance that when the changes are installed in the ship, the TRIDENT Combat system will operate as designed, allowing the ships to maintain their operational schedules and mission capabilities. LI 0950 - Strategic Platform Support Equip Navy UNCLASSIFIED Page 1 of 8 P-1 Line #17 Volume 1 - 407 === page 486 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0950 / Strategic Platform Support Equip Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / HH009 EQUIPMENT HM&E & SWS/SS ALTERATION]: This provides for the replacement of obsolete equipment to maintain or increase mission capabilities, replacement/modification of equipment identified as unreliable to reduce fleet maintenance, or correct safety items on board OHIO Class Submarines and at dedicated Shore Support Facilities. This line provides equipment procurement and installation, technical planning, training, and associated resources. [P40A / SCS SHIPALT DEV AND SUSTAINMENT]: Ship Control System (SCS) resolves interoperability issues and provides periodic system upgrades to mitigate obsolescence. [P40A / SWSS (VAMP MOD 3)]: SSBN Strategic Weapon Support Systems (SWSS) program maintains the SWSS surveillance, modernization and obsolescence management program. This line monitors and predicts SWSS obsolescence issues and plans for program modernization to ensure OHIO class submarines continue to meet mission requirements until replaced by the COLUMBIA Class. Items anticipated may include; Harvesting Critical Components, Reverse Engineering, Form-Fit-Function replacements, providing lifetime buys, providing component-level SHIPALTs (reactive). This includes the development of SWSS Ventilation and Alarm Monitoring Panel(VAMP) MOD 3 solution, which modernizes the equipment to ensure the SWSS program continues to effectively function. [P40A / SWSS Sustainability]: Complete Non-Recurring Engineering (NRE), Ship Alteration Development and qualification for replacement of major Strategic Weapons Support Systems (SWSS) components and systems. Modernizes OHIO Class submarines SWSS with COLUMBIA technology. The SWSS System is a 1970's analog system that requires modernization to support SSBN. Current OHIO SWSS components will not support end of service life (EOSL). Identification of SWSS obsolescence issues continues to increase as the equipment ages with no advanced warning. The inability to obtain parts are impacting Ao of the SWSS after workarounds have been exhausted. Failure to address obsolescence results in loss of system capability, reduction in Ao, and impacts the ability of the SSBN platform to achieve the 42-year service life. Replacing obsolete SWSS OHIO class components with qualified COLUMBIA class technology minimizes development and qualification effort, mitigates occurrence of unexpected obsolescence issues, and establishes common equipment baseline for remainder of fleet service life. [P40A / Ohio Class HM&E Modernization]: OHIO Class Hull, Mechanical and Electrical (HM&E) Modernization funds initial cost estimates and planning as well as resolutions to safety, obsolescence, and interoperability issues for lower cost efforts that will not be tracked independently. Previous budget cycles prioritized funding away from this line to other HM&E modernization efforts resulting in a growing backlog. TRIDENT Hull, Mechanical and Electrical systems require modernization for systems safety to address key sustainment issues. These efforts are considered must-fund to address safety, reliability, and Ao risks. Provides funding to support design and development of safety and reliability efforts to address sustainment or obsolescence issues. [P40A / Missile Compartment Thermal Event (MCTE)]: Missile Compartment Thermal Event (MCTE), commences in FY24, providing for non-recurring engineering (NRE) and alternation (ALT) development, installation material, and installation of equipment (lockers, detectors, cabling) and structural/system modification (bulkheads, piping, valves). Alteration mitigates a high-risk vulnerability identified on strategic assets by providing defense-in-depth (preventing a fire, detecting a fire, containing a fire, suppressing a fire, extinguishing a fire, and slowing the heat transfer to the Missile Tubes). Beginning in FY26, this line also funds procurement and installation of Passive Fire Protection (PFP) materials (Promat microporous insulation wrap and NoFire A18-NV coating intumescent paint) on all SSBN missile tubes. Passive Fire Protection provides ample mitigation to reduce the risk associated with a sustained thermal event in the Missile Compartment to an acceptable level. Job hazard analysis estimates an unprotected tube will reach the critical temperature in 27-28 minutes while a fully protected tube will take ~300 minutes. The PFP solution was briefed to and accepted by all stakeholders at the Three Star Missile Compartment Thermal Event brief on 10 October 2023. PFP minimizes the potential impact caused by a Missile Compartment thermal event to the strategic deterrence mission. [P40A / Electric Hull Penetrators]: In FY26, this line funds the procurement of Electrical Hull Penetrators (EHPs) at the rate necessary to support current fleet demands based on historical failure rate of 1 EHP/ Hull/QTR. There is currently zero-stock NSS EHPs for SSBNs. Lack of stock is creating delays in the installation/repairs of equipment, deferred maintenance and preventing continued effort of Depth Mode Noise (DMN) investigation, degrading Strategic Weapons Systems (SWS) Navigation Subsystem accuracy. This effort replenishes the stock. The failure of these components themselves is a great risk to the safety of the ship given the opportunity for severe water damage. Addresses the need to support the DoD's #1 mission, Nuclear Strategic Deterrence. [P40A / Heat and Smoke Detection Annunciator Network (HASDAN)]: HASDAN modernization resolves a high-risk vulnerability noted for OHIO Class strategic weapons system spaces to detect and respond to a major fire in a low manning condition (i.e. refit or overhaul) situation. An installed fire detection system alleviates this vulnerability by allowing for rapid recognition and response to a fire casualty. Investment in this modernizations will mitigate production/manning costs to establish/disestablish temporary systems during repair/modernization periods. LI 0950 - Strategic Platform Support Equip Navy UNCLASSIFIED Page 2 of 8 P-1 Line #17 Volume 1 - 408 === page 487 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0950 / Strategic Platform Support Equip Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / Life Support System (LPE) Procurement]: The Submarine Life Support System provides necessary design/development, procurement, and installation efforts to address required modernization changes to the Submarine Life Support Systems. Oxygen Generators are necessary for life support and to maintain submarine stealth while on mission. This funding currently funds replacement of the Electrolytic Oxygen Generator (EOG) with a Low Pressure Electrolyzer (LPE) on both SSBN and SSGN submarines. The LPE produces oxygen at low pressure, eliminating the need for high pressure oxygen storage. There will be two LPEs on each SSBN/SSGN Class submarine. EOG's must be replaced by LPE's on OHIO SSBNs to ensure they can sustain current operational availability requirements through their 42 yr service life. Therefore, procurements are driven by the OHIO Class maintenance period schedule. The replacement of the EOG with the LPE must be done during a major maintenance availability due to the time to complete the installation. Future efforts will include design and development efforts for the Central Atmosphere Monitoring System (CAMS) sustainment for SSGN/BN classes. [P40A / Combat Control System (CCS) Revision Eng/Cert Test]: This program develops upgrades to legacy systems to maintain required interface connectivity to other Program Acquisition Resource Manager (PARM) managed subsystems in response to PARMs modernizations, or to address obsolescence, or where mandated requirement changes (example Cyber Security) drive changes to hardware or software. [P40A / SSBN Legacy CCS Modernization]: This program is critical to maintaining OHIO Class SSBN operational to the end of service life and delivery of COLUMBIA Class SSBN replacements. The program resolves Data Processing Subsystem (DPS) obsolescence issues and conjunctively supports the upgrade of the SSBN legacy CCS to the Submarine Warfare Federated Tactical Systems (SWFTS) architecture common with the SSN/SSGN classes. Collectively, the DPS and SWFTS upgrades modify Fire Control, SONAR, Voyage Management System (VMS), RADAR, Tactical Navigation, and Periscopes, and collaterally impact Ship Control, Monitoring Subsystem, and interfaces to ship sensors such as speed, depth, and Extremely High Frequency Satellite Communication navigation data. The DPS upgrade includes replacing all UYK-43 computers, DPS workstation, TRIDENT Signal Data Converters (TSDC), and the UGC-143 with a modified Electronic Control Display Unit (ECDU). The ECDU is common equipment on VA Class and planned for the COLUMBIA Class. The ECDU requires hardware and software development to interface to the Strategic Weapon System (SWS) Navigation and maintain critical Ship to SWS interface requirements. The ECDU and all the associated CCS architecture modifications are required to be installed conjunctively with SWFTS. Continued operation of the SSBN strategic mission will require the implementation of the ECDU upgrade along with the SWFTS upgrade. [P40A / TT Fiber Optic Interface Upgrade]: New weapons systems such as the MK 48 Mod 8 / Mod 9 torpedo use a fiber optic guidance wire interface rather than the legacy copper wire system. This requires installation of a new torpedo tube penetrator. Funding is required to design, procure, and install new penetrators on all in service SSBNs. [P40A / SSBN TRIPER Obsolescence]: TRIDENT Planned Equipment Replacement (TRIPER) program for Hull, Mechanical and Electrical systems require modernization to address key sustainment issues. HM&E systems on these boats have been maintained utilizing modernization at the lowest repairable unit to address obsolescence issues. This funding will resolve specific issues related to HM&E systems no longer supportable. [P40A / SSBN Emergency Diesel Generator (EDG) Sustainment]: TYCOM, NAVSEA 08, NAVSEA 05, SSBN PEO priority tasking for modernization efforts related to risk reduction for Emergency Diesel Generators. Efforts focus on reducing hard shutdowns, improving lubrication from cold start, and resolving obsolescence issues. Funding provides for NRE and ALT development of multiple EDG upgrades, procurement of installation material, and onboard installation of equipment to include structural/system modification to support installation. [P40A / EDG Rotable Pool Program]: The Emergency Diesel Generator (EDG) Rotatable Pool is critical to reducing risk to availabilities by ensuring long-lead time parts are kitted and available for execution. Funding will also go towards resolving TRIPER components that are coming to the end of economic reparability that are no longer available for procurement and require engineering efforts to resolve obsolescence. [P40A / SSBN EDG Modernization - DGCP (Control Panel)]: Emergency Diesel Generator Control Panel (DGCP) replaces an obsolete system. This modernized, digital DGCP, will replace the legacy DGCP and address numerous obsolescence issues within the cabinet itself. This effort enables improvement such as Reverse Power Monitoring and logging, Main Bearing Temperature logging and alarms, and Firing Temperature and Pressure alarms and logging, and vibration monitoring, logging, and analysis. Ao improvements are expected due to a combination of having parts available instead of rolling cannibalizations and the early identification of negative trends within both the Diesel and Generator components. EDG alterations will modernize the diesel and generator monitoring systems, addressing the concerns of COMSUBFOR, NAVSEA 08, and NAVSEA 05. [P40A / Oversight - AIT Installation Support (SIB)]: Submarine Industrial Base (SIB) funding for required SSBN oversight and availability execution associated with Alteration Installation Team (AIT) installations. LI 0950 - Strategic Platform Support Equip Navy UNCLASSIFIED Page 3 of 8 P-1 Line #17 Volume 1 - 409 === page 488 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0950 / Strategic Platform Support Equip Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / TRIDENT Load List Range/Depth Additions]: Funding to support Trident Load List (TLL) material procurements of in-execution year range and depth adds as determined by configuration changes, demand history and TYCOM/Trident Refit Facility candidate nominations. Supports funding of TLL component candidate additions ensuring parts are available in support of operational requirements. [P40A / HH012 EQUIPMENT HM&E TRIDENT ENGINGEERING AVAILABILITY]: TRIDENT Engineered Availability (EA) support funding is required to provide system engineering, technical, logistic and configuration management support for all accomplished modernization during the SSBN 726 Class Submarine Engineered Availabilities (EAs). This program also provides funding for Quality Assurance (QA) oversight and certification by Supervisor Of Shipbuilding, Groton (SOS Groton) of SHIPALTS performed by Electric Boat Corporation (EB), provides funding to the Planning Yard for Configuration Record change and Liaison Action Request processing, and Selected Record Drawings mark ups for SHIPALT-related work, accomplishment of availability work package requirements assigned to the Planning Yard such as Design Review hanger inspections, Integrated Logistic Support product updates, and Configuration Overhaul Planning Product development and distribution for each availability. The program also provides funding for NUWC Newport system-level final end-to-end certification test development and onboard test conduct and analysis to support end of CNO availability certification of entire Command and Control system as ready for sea and strategic deployment. This system-level engineering support is provided during Extended Refit Periods (ERPs) and Maintenance & Modernization Periods (MMPs). [P40A / Extended Refit Period (ERP) Long Lead Time Material Procurement]: Funding to execute Long Lead Time Material (LLTM) procurements in support of Extended Refit Period (ERP) maintenance for SSBNs 741-743. Due to the incremental maintenance philosophy of SSBNs, forecasting the material required to execute depot-level maintenance is more challenging and nuanced than with other maritime platforms. Material procurements are grouped together to enable more effective contracting actions, to leverage economies of scale, and to minimize the existing capacity and throughput challenges of the defense industrial base. LI 0950 - Strategic Platform Support Equip Navy UNCLASSIFIED Page 4 of 8 P-1 Line #17 Volume 1 - 410 === page 489 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0950 / Strategic Platform Support Equip Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Strategic Platform Support Equip - / 147.119 - / 53.931 - / 38.039 - / 72.163 P-40 Total Gross/Weapon System Cost - / 147.119 - / 53.931 - / 38.039 - / 72.163 - / - - / 72.163 / 0.000 - / 72.163 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Increased funding in FY27 supports Strategic Weapons Support Systems (SWSS) Replacement of Hull Keel Depth Transducers for modernization of OHIO Class Hovering and Compensation Systems and procurement and fielding of the Missile Dehumidification and Drying Machine. Funding increases in FY27 for Passive Fire Protection to wrap Missile Tubes on an additional hull in order to mitigate the potential impact caused by a Missile Compartment Thermal Event. Funding commences in FY27 to support TRIDENT Load List Range/Depth Additions and Extended Refit Period Long Lead Time Material procurements to support SSBN 741's ERP. Additionally, increased funding in FY27 supports development, procurement and installation of critical Ohio Class HM&E Modernization. HM&E Modernization funding enables PMS396 to respond to fleet requests for HM&E modernization for safety and reliability alterations. This allows for continued operation and increased supportability of systems, such as Torpedo Tube Fiber Optic Interface Upgrade, Torpedo Tube Fiber Optic Penetrator (TTFOP), SSBN Emergency Diesel Generator (EDG) Sustainment, and EDG Modernization - DGCP (Control Panel). LI 0950 - Strategic Platform Support Equip Navy UNCLASSIFIED Page 5 of 8 P-1 Line #17 Volume 1 - 411 === page 490 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0950 / Strategic Platform Support Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Strategic Platform Support Equip FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) HH009 EQUIPMENT HM&E & SWS/SS ALTERATION 1.1) SCS SHIPALT DEV AND SUSTAINMENT A 1.2) SWSS (VAMP A MOD 3) (1) 1.3) SWSS (VAMP MOD 3) Installation A 1.4) SWSS A Sustainability (2) 1.5) Ohio Class HM&E Modernization A 1.6) Missile Compartment Thermal A (3) Event (MCTE) (4) 1.8) Missile Compartment Thermal Event (MCTE) Installation A 1.9) Heat and Smoke Detection Annunciator A Network (HASDAN) (5) 1.10) Life Support System (LPE) Procurement A (6) 1.11) Life Support Systems (Design & Development) A (7) 1.12) Common Platform Engineering A 1.13) Combat Control System (CCS) Revision Eng/Cert A (8) Test - - 42.202 - - 1.842 - - 1.482 - - 0.549 - - - - - 0.549 - - 9.978 - - 0.742 - - - - - - - - - - - - - - 2.000 - - - - - - - - - - - - - - - - - 7.057 - - 8.048 - - 6.718 - - 12.556 - - - - - 12.556 - - 1.932 - - 7.896 - - - - - 15.758 - - - - - 15.758 - - 1.592 - - 1.564 - - 4.858 - - 10.219 - - - - - 10.219 - - 0.829 - - 0.830 - - 0.856 - - - - - - - - - - - 7.109 - - 1.620 - - - - - - - - - - - - - - 4.100 - - - - - - - - - - - - - - - - - 6.566 - - 2.743 - - 0.082 - - 0.168 - - - - - 0.168 - - - - - 1.104 - - 1.117 - - 1.139 - - - - - 1.139 - - - - - 2.672 - - 2.763 - - 2.815 - - - - - 2.815 - - - - - 2.663 - - 2.694 - - 2.748 - - - - - 2.748 - - - - - 0.946 - - 0.927 - - 1.290 - - - - - 1.290 - - - - - 2.660 - - 2.713 - - 2.767 - - - - - 2.767 (9) 1.14) SSBN Legacy CCS Modernization A 1.15) TT Fiber Optic A (10) Interface Upgrade (11) 1.16) SSBN TRIPER Obsolescence (12) A LI 0950 - Strategic Platform Support Equip Navy UNCLASSIFIED Page 6 of 8 P-1 Line #17 Volume 1 - 412 === page 491 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0950 / Strategic Platform Support Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 1.17) SSBN Emergency Diesel Generator (EDG) A Sustainment Pool Program (14) A 1.19) SSBN EDG Modernization DGCP (Control Panel) A 1.20) Life Support System (LPE) A (15) 1.21) Oversight - AIT Installation Support (SIB) A 1.22) TRIDENT Load List Range/Depth A Additions Code Unit Cost ($) Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - - - - - 3.940 - - 2.760 - - 3.515 - - - - - 3.515 - - - - - 2.370 - - 4.608 - - 3.934 - - - - - 3.934 - - - - - 9.000 - - 3.000 - - 2.312 - - - - - 2.312 - - 1.083 - - - - - 1.165 - - 1.107 - - - - - 1.107 - - 0.370 - - - - - - - - - - - - - - - - - - - - - - - - - - 4.814 - - - - - 4.814 - - 84.818 - - 50.640 - - 35.743 - - 65.691 - - - - - 65.691 (13) 1.18) EDG Rotable Installation MAIS FY 2025 Total Cost Aggregated Items Title: Strategic Platform Support Equip (16) Subtotal: 1) HH009 EQUIPMENT HM&E & SWS/SS ALTERATION 2) HH012 EQUIPMENT HM&E TRIDENT ENGINGEERING AVAILABILITY 2.1) SHIPALT INSTALLATION AND ENGINEERING A - - 26.023 - - 1.382 - - 0.534 - - 0.669 - - - - - 0.669 - - 21.743 - - 1.119 - - 1.001 - - 1.225 - - - - - 1.225 - - 14.535 - - 0.790 - - 0.761 - - 0.864 - - - - - 0.864 - - - - - - - - - - - 3.714 - - - - - 3.714 Subtotal: 2) HH012 EQUIPMENT HM&E TRIDENT ENGINGEERING AVAILABILITY - - 62.301 - - 3.291 - - 2.296 - - 6.472 - - - - - 6.472 Total - - 147.119 - - 53.931 - - 38.039 - - 72.163 - - - - - 72.163 SERVICES (17) 2.2) CCS EQUIPMENT REFURBISHMENT & SHIPBOARD TESTING A 2.3) HM&E EQUIPMENT REFURBISHMENT & SHIPBOARD TESTING A 2.4) Extended Refit Period (ERP) Long Lead Time Material A Procurement (18) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. LI 0950 - Strategic Platform Support Equip Navy UNCLASSIFIED Page 7 of 8 P-1 Line #17 Volume 1 - 413 === page 492 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0950 / Strategic Platform Support Equip Aggregated Items Title: Strategic Platform Support Equip Footnotes: (1) Development of SWSS VAMP MOD 3 solution is required to modernize the equipment to ensure the SWSS program continues to effectively function with the boat's Technical Insertion (TI) platform as it is upgraded by Submarine Warfare Federated Tactical System (SWFTS). If not modernized, the new SWSS equipment will not function properly. (2) Some FY26 required Strategic Weapons Support Systems (SWSS) development efforts were deferred to FY 2027 in order to fund other Navy priorities. Increase in FY27 funds replacement of Hull Keel Depth Transducers, sensor calibration and software updates to VAMP MOD 3, and Missile Dehumidification and Drying Machine (MDDDM) procurements. The Strategic Weapons Support Systems (SWSS) sensors being replaced include MHC Water temp sensors, MHC Pump DP Sensor, DP Airflow Sensor, MDD Differential Pressure Sensors, MDD Gauge Pressure Sensors, MG Trap Tank Liquid Level Sensor, MHC Expansion Tank Liquid Level Sensor, Electro-Pneumatic Transducer. (3) FY26 required Ship Alteration development efforts were deferred to FY 2027 in order to fund other Navy priorities. The FY27 increase restores HM&E development funding to the level required to execute deferred engineering work, complete critical technical reviews, and deliver the platform-level upgrades necessary to support strategic warfare capabilities. The FY27 increase funds ship alts for development and installation of replacing OHIO Class clothes washers, obsolete ACN-4001R Breakers, rescue seat protectors, and Emergency Main Ballast Tank (EMBT) Blow system reliability and obsolescence efforts. Additional development efforts will address Ohio class R-114 AC unit obsolescence, multiple/various valve obsolescence, and safety deficiencies as they are discovered. Modernizations targeted in this line specifically address reliability and risk reduction on systems which have negatively impacted SSBN Ao. (4) (5) Additional funding in FY27 funds the procurement and installation of Passive Fire Protection (PFP) materials (Promat microporous insulation wrap and NoFire A18-NV coating intumescent paint) for an additional SSBN Hull. Following the USS MIAMI fire, a high-risk vulnerability assessment was conducted on the ability to detect and respond to a major fire, within OHIO Class strategic weapons system spaces, in a low manning condition (i.e. refit or overhaul). A permanently installed fire detection system was identified to partially mitigate this vulnerability by allowing for rapid recognition and response to a fire casualty as well as eliminate production/manning costs to establish/disestablish temporary systems during repair/modernization periods. (6) FY26 required Low Pressure Electrolyzer (LPE) procurement efforts were deferred in order to fund other Navy priorities. LPE unit orders are timed to support installations during a long refit. Installations are also aligned when current oxygen generators would receive required replacement of cells which are necessary for continued operation of legacy oxygen generators, thus avoiding an approximate $2M/ship additional maintenance cost. Funding supports procurement of Low Pressure Electrolyzers (LPEs) on OHIO Class submarines two (2) to coincide with availability schedules. Each OHCL boat requires 2 LPEs. (7) Submarine Life Support Systems design and development supports ongoing efforts for Central Atmospheric Monitoring System (CAMS), Diesel Exhaust, Electro Oxygen Generators (EOG), Automatic Electro-Oxygen Generators (AEOG), Oxygen Concentration (SAROS), other oxygen generators (ILPE, AILPE, LPE), CO2 Scrubbers, and Burners. (8) (9) OPNAV transferred Common Platform Engineering from Budget Line Item 2676 into 0950 commencing in FY25 as a zero-sum transfer of funds. OPNAV transferred Combat Control System (CCS) Revision Eng/Cert Test from Budget Line Item 2676 into 0950 commencing in FY25 as a zero-sum transfer of funds. (10) (11) OPNAV transferred SSBN Legacy CCS Modernization from Budget Line Item 2676 into 0950 commencing in FY25 as a zero-sum transfer of funds. Funding commences in FY25 and provides for NRE, procurement, and installation of new torpedo tube penetrators in order to interface with the new MK48 Mod 8 / Mod 9 fiber optic guidance wire interface which replaces the legacy copper wire system. (12) (13) Funding commences in FY25 for TRIDENT Planned Equipment Replacement (TRIPER) obsolescence solutions. Funding commences in FY25 and provides for NRE and ALT development of multiple Emergency Diesel Generator (EDG) upgrades, procurement of installation material, to include structural/system modification to support installation. The FY25 to FY26 decrease is due to some development efforts maturing. (14) Funding commences in FY25 for Emergency Diesel Generator (EDG) rotatable pool to reduce risk to availabilities by ensuring long-lead time parts are kitted and available for execution. Increased funding in FY26 is required for additional long-lead time parts in order to fully standup the pool. (15) (16) (17) FY26 funding installs Life Support System (LPE) material procured in FY24. Funding commences in FY27 to ensure sufficient funds are available to support this critical, pre-positioned TRIDENT material ensuring that parts are available at the Trident Refit Facilities. Beginning in FY22, significant effort to drive down the backlog of necessary updates for Configuration Record changes, Liaison Action Request processing, Selected Drawings (SRD) mark-ups for SHIPALT-related work, accomplishment of Availability work packages (AWP) requirements assigned to the Planning Yard, such as Design Review hanger inspections, Integrated Logistic Support product updates, and Configuration Overhaul Planning Product development for each availability (ERP/ERO). This paperwork, which started to significantly backlog in the last few years, is vital to properly sustaining each Strategic boat by ensuring clear and accurate as-built configuration control of capabilities installed in each hull, as well as to execute expedient new development and incorporation of new technology onboard these Strategic platform. (18) Funding commences in FY27 and is phased to support 741 ERP in FY27 and SSBNs 742 and 743 in FY29. Material procurements are grouped together to enable more effective contracting actions, to leverage economies of scale, and to minimize the existing capacity and throughput challenges of the defense industrial base. LI 0950 - Strategic Platform Support Equip Navy UNCLASSIFIED Page 8 of 8 P-1 Line #17 Volume 1 - 414 === page 493 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0955 / Deep Subm Sys Proj (DSSP) Equip Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 63.694 4.586 5.849 7.440 0.000 7.440 5.653 5.742 5.856 - - - - - - - - - 63.694 4.586 5.849 7.440 0.000 7.440 5.653 5.742 5.856 - - - - - - - - - 63.694 4.586 5.849 7.440 0.000 7.440 5.653 5.742 5.856 To FY 2031 Complete 5.970 Continuing - Continuing - 5.970 Continuing - Total - Continuing - - 5.970 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Undersea Special Mission Systems Program, formerly Deep Submergence Systems Program (DSSP), is responsible for the procurement, life cycle support, improvement and modernization of assigned platforms and programs. The Undersea Special Missions Systems Program provides for the procurement of equipment to support the establishment and maintenance of fleet capability for a number of programs which perform submarine rescue, escape, search, inspection, and object location and retrieval from the ocean environment. Submarine escape and rescue procurements replace obsolete, non-supportable equipment and subsystems through phased improvement and modernization projects. These projects may include special ship alterations, field change kits, and design corrections. FY2027 funding provides modernization of special mission systems, including the Navy's only Submarine Rescue System (SRS) assets. Modernization of the SRS is necessary to address known reliability and obsolescence issues and to sustain the system through its end-of-life period, ensuring continued operability until replacement. SOURCES: The sources for these acquisitions are limited. There are few private companies actively engaged in deep ocean engineering and even fewer with the specialized certifications, experience, knowledge, and facilities to meet the exacting requirements of submarine escape and rescue. Accordingly, sole source contracts are sometimes required; however, where possible, contracting via open competition is utilized. [P40A / HJ030 - RESCUE SUPPORT EQUIPMENT]: Intervention Systems (Remotely Operated Vehicles (ROV)/ SRS: Intervention assets (ROV) are required to support the SRS world-wide rescue capability mission. Intervention assets are used to clear disabled submarine's seating surfaces, attach salvage fittings, deliver emergency life support stores, and assess distressed submarines condition. The ROV is an unmanned system that reduces operational risk from the previous Intervention Assets that were a manned system, Atmospheric Diving System (ADS). SRS is the pressurized rescue ready system for the U.S. Navy. SRS was delivered in increments; the Submarine Rescue System-Rescue Capable System (SRS-RCS) completed OPEVAL in FY08, and the final component of SRS was the Submarine Rescue SystemSubmarine Decompression System (SRS-SDS) providing the Transfer Under Pressure (TUP) capability which has been delivered and completed Initial Operating Capability (IOC)/Final Operating Capability (FOC) in FY2019. LI 0955 - Deep Subm Sys Proj (DSSP) Equip Navy UNCLASSIFIED Page 1 of 3 P-1 Line #18 Volume 1 - 415 === page 494 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0955 / Deep Subm Sys Proj (DSSP) Equip Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Deep Subm Sys Proj (DSSP) Equip - / 63.694 - / 4.586 - / 5.849 - / 7.440 P-40 Total Gross/Weapon System Cost - / 63.694 - / 4.586 - / 5.849 - / 7.440 - / - - / 7.440 / 0.000 - / 7.440 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY2027 increase over FY2026 supports scheduled procurement of those technologies and subsystems developed in previous years that support the modernization of the U.S. Submarine Rescue System (SRS), to include the procurement and implementation of Pressurized Rescue Module (PRM) toxic gas detection system to address known capability gaps. Navy added these additional resources to provide a credible SRS for our sailors and ally partner nations. FY 2027 funding is to continue the SRS modernization and upgrade. Funding levels required in order to meet fleet wholeness requirements for resiliency related to submarine rescue system critical items, sparing, and operational availability and crucial field changes. LI 0955 - Deep Subm Sys Proj (DSSP) Equip Navy UNCLASSIFIED Page 2 of 3 P-1 Line #18 Volume 1 - 416 === page 495 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0955 / Deep Subm Sys Proj (DSSP) Equip Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: Deep Subm Sys Proj (DSSP) Equip FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) HJ030 - RESCUE SUPPORT EQUIPMENT 1.1) SRS Modernization and Upgrade Spares A - - 63.694 - - 4.586 - - 5.849 - - 7.440 - - - - - 7.440 Subtotal: 1) HJ030 - RESCUE SUPPORT EQUIPMENT - - 63.694 - - 4.586 - - 5.849 - - 7.440 - - - - - 7.440 Total - - 63.694 - - 4.586 - - 5.849 - - 7.440 - - - - - 7.440 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. LI 0955 - Deep Subm Sys Proj (DSSP) Equip Navy UNCLASSIFIED Page 3 of 3 P-1 Line #18 Volume 1 - 417 === page 496 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 418 === page 497 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0956 / Small Unmanned Surface Vehicles Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 0.000 0.000 0.000 0.585 0.000 0.585 2.195 2.026 2.081 2.122 - 9.009 Total - - - - - - - - - - - - 0.000 0.000 0.000 0.585 0.000 0.585 2.195 2.026 2.081 2.122 - 9.009 - - - - - - - - - - - - 0.000 0.000 0.000 0.585 0.000 0.585 2.195 2.026 2.081 2.122 - 9.009 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: This Other Procurement, Navy line item supports the Golden Fleet Strategy by rapidly fielding many resilient, aeratable systems with diverse capabilities such as the key programs within the Unmanned Surface Vehicle (USV) Family of Systems (FoS). The sUSV Portfolio consists of a family of systems designed to meet an urgent Geographic Combatant Command Requirement. The sUSV FoS fulfill's the Navy's emergent need to operate sUSVs with autonomous software while operating at long distances. The Navy defined the emergent need to operate and refine tactics with the sUSVs through two efforts. A single sUSV within the sUSV FoS consists of a USV, a communications system, a command and control (C2) station, the procurement and integration of autonomy software, and a payload that will be integrated once the USV is delivered. The GARC is an unmanned vehicle that requires a high bandwidth datalink to operate at long distances. Additionally, the platform is equipped with a radar, infrared devices, and capable of carrying various payloads. The platform includes an autonomy ready package, high-definition surveillance cameras, and remote command and control capabilities. The CORSAIR program consists of a combination of sUSVs that will be used to conduct Naval operations to meet an urgent Geographic Combatant Command Requirement. sUSV CORSAIR is a production-ready, inexpensive Maritime capability leveraging the best of commercial technology and innovations at speed and scale. The One Way Attack (OWA) Surface program consists of sUSVs that will be used to conduct Naval operations to meet an urgent Geographic Combatant Command Requirement. Which is a production-ready, low-cost Maritime capability leveraging the best of commercial and government technology and innovations at speed and scale. Starting in FY2026, LI 0956 has been established for Small Unmanned Surface Vehicles. The Small Unmanned Surface Vehicle Family of Systems was previously funded under LI 1210 H00014. The FY2026 spend plan for 0956 Small Unmanned Surface Vehicles (sUSV) includes $0 million of discretionary and $1,406 million of mandatory for a total of $1,406 million. LI 0956 - Small Unmanned Surface Vehicles Navy UNCLASSIFIED Page 1 of 3 P-1 Line #19 Volume 1 - 419 === page 498 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0956 / Small Unmanned Surface Vehicles Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Small Unmanned Surface Vehicles - / 0.000 - / 0.000 - / 0.000 - / 0.585 - / 0.000 - / 0.585 P-40 Total Gross/Weapon System Cost - / 0.000 - / 0.000 - / 0.000 - / 0.585 - / 0.000 - / 0.585 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY2027 funding request for 0956 Small Unmanned Surface Vehicles (sUSV) continues CORSAIR procurement and the associated GARC/CORSAIR fielding hardware. This line now also includes sUSV One way attack vehicle previously procured in PANMC 1776. As these vehicle's procurement efforts are part of the Small Unmanned Surface Vehicle Family of Systems not previously called out in there own exhibit. LI 0956 - Small Unmanned Surface Vehicles Navy UNCLASSIFIED Page 2 of 3 P-1 Line #19 Volume 1 - 420 === page 499 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0956 / Small Unmanned Surface Vehicles Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Small Unmanned Surface Vehicles MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 0.000 0.000 0.000 0.585 0.000 0.585 - - - - - - 0.000 0.000 0.000 0.585 0.000 0.585 - - - - - - 0.000 0.000 0.000 0.585 0.000 0.585 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Support - Production Engineering Cost 5.3) JC003 - sUSV Support Equipment - - - - - - - - - - - 0.585 - - - - - 0.585 Subtotal: Support Production Engineering Cost - - - - - - - - - - - 0.585 - - - - - 0.585 Gross/Weapon System Cost - - 0.000 - - 0.000 - - 0.000 - - 0.585 - - 0.000 - - 0.585 LI 0956 - Small Unmanned Surface Vehicles Navy UNCLASSIFIED Page 3 of 3 P-1 Line #19 Volume 1 - 421 === page 500 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 422 === page 501 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0970 / LCAC Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 186.890 186.890 186.890 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 11.013 0.000 22.515 0.000 22.515 17.116 17.403 18.579 18.943 - - - - - - - - - - - 11.013 0.000 22.515 0.000 22.515 17.116 17.403 18.579 18.943 - - - - - - - - - - - 11.013 0.000 22.515 0.000 22.515 17.116 17.403 18.579 18.943 - Total 292.459 292.459 292.459 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The LCAC (Landing Craft, Air Cushion), which consists of both the legacy and LCAC 100 classes of craft, mission is to transport weapons systems, equipment, cargo, and personnel of the assault elements for the Marine Air/Ground Task Force from ship to shore and across the beach. The LCAC rides on a cushion of air contained in a flexible skirt and is propelled by two aft-mounted, reversible, variable pitch propellers. It is capable of speeds in excess of 40 knots. The LCAC sustainment funding is programmed for equipment procurement using OPN to replace selected engines, Personnel Transport Modules and other equipment that the fleet urgently requires to maintain acceptable levels of readiness. LC001 - LCAC SYSTEM UPGRADES The LCAC System Upgrade Program provides procurement and installation of components required to maintain acceptable levels of fleet operational readiness. LCAC System Upgrade Program will also provide materials to support systems upgrades. Equipment removal and installation will take place at Assault Craft Unit FOUR (ACU 4), ACU 5 and Naval Beach Unit SEVEN (NBU 7). Specific items procured vary from year to year based on Fleet needs; these items include but are not limited to C4N upgrades and deep skirt replacements. LC002 - ENGINES The ETF-40B engines are enhanced versions of the current TF-40B engines and are installed on Service Life Extension Program (SLEP) craft. Catastrophic engine failures have highlighted the need for spare engines to reduce operational downtime. Engine procurements are also for Pack Up Kits (PUKs) that accompany fleet deployment of LCACs aboard amphibious ships. Additional ETF-40B Engines will be needed to meet operational needs. LC007 - LIGHTWEIGHT ARMOR The portable lightweight armor system replaces the existing armor system. The portable system can be transported via a Container Express (CONEX) box and provides the fleet ballistic/fragmentation protection to manned spaces on the craft as well as to selected machinery components. LC008 - COLD WEATHER KITS LCAC requires to be capable of operating in temperature ranges from 10 degrees Fahrenheit to 100 degrees Fahrenheit. In order to operate in weather conditions below 50 degrees Fahrenheit, a cold weather kit is required. Snow and ice accumulation leads to actuation of a safety system that bypasses the main engine inlet air filtration system and allows engines to draw in unfiltered air. Cold weather kits prevent snow and ice accumulation in the main engines during cold weather operations keeping the craft operational during deployments. LI 0970 - LCAC Navy UNCLASSIFIED Page 1 of 4 P-1 Line #20 Volume 1 - 423 === page 502 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0970 / LCAC Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A LC009 - PERSONNEL TRANSPORT MODULE The Personnel Transport Module (PTM) provides the capability of the Landing Craft Air Cushion (LCAC) to transport personnel and protect occupants from the elements inherent in an amphibious environment. LC010 - LCAC 100 CLASS MAJOR SHORE BASED SPARES (Ship to Shore Connector, SSC) Major Shore Based Spares (MSBS) Spares to be procured beginning in FY22 include major equipment with long lead times including such items as Engines, Skirts, Composites, Auxiliary Power Units, Propellers, Bow and Stern Ramps, Gearboxes, Lift Fan Impellers, and Fuel Pump & Metering Units. First craft arrived at the ACU 4 in FY22. LC011 - TRAINER SYSTEM UPGRADES AND MODERNIZATION Upgrade / modernization of the LCAC Full Motion Trainer (FMT), which provides essential training for the Operator, Engineer, Navigator, and Group Commander of the LCAC, in the complex skills required for the safe operation of the LCAC in both normal and casualty mode. Note: The FY 2026 spend plan for LCAC includes $0 thousand in discretionary and $20,321 thousand of mandatory (reconciliation) for a total of $20,321 thousand. The mandatory funds were provided in the One Big Beautiful Bill Act (OBBBA) and will procure Major Shore Based Spares (MSBS) for LCAC 100 class craft. LI 0970 - LCAC Navy UNCLASSIFIED Page 2 of 4 P-1 Line #20 Volume 1 - 424 === page 503 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0970 / LCAC Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a LCAC - / 186.890 - / 11.013 P-40 Total Gross/Weapon System Cost - / 186.890 - / 11.013 - / - - / 22.515 / 0.000 - / 22.515 - / - - / 22.515 / 0.000 - / 22.515 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The increase from FY26 to FY27 is due to an increase in the planned procurement of Major Shore Based Spares (MSBS) for LCAC 100 class including spare engines. LI 0970 - LCAC Navy UNCLASSIFIED Page 3 of 4 P-1 Line #20 Volume 1 - 425 === page 504 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0970 / LCAC Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: LCAC FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) LCAC 1.1) LC001 LCAC SYSTEMS UPGRADE A 1.2) LC002 ENGINES A 1.3) LC007 LIGHTWEIGHT ARMOR A 1.4) LC008 COLD WEATHER KITS A 1.5) LC009 PERSONNEL TRANSPORT MODULE A 1.6) LC010 LCAC 100 CLASS MAJOR SHORE BASED SPARES (SSC) A 2,011K 38 76.405 - - - - - - - - - - - - - - - 2,049K 23 47.138 - - - - - - - - - - - - - - - 610,545.45 11 6.716 - - - - - - - - - - - - - - - 646,285.71 7 4.524 - - - - - - - - - - - - - - - 857,090.91 11 9.428 - - - - - - - - - - - - - - - - - 42.679 - - 11.013 - - - - - 22.515 - - - - - 22.515 Subtotal: 1) LCAC - - 186.890 - - 11.013 - - - - - 22.515 - - - - - 22.515 Total - - 186.890 - - 11.013 - - - - - 22.515 - - - - - 22.515 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. LI 0970 - LCAC Navy UNCLASSIFIED Page 4 of 4 P-1 Line #20 Volume 1 - 426 === page 505 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0977 / Underwater EOD Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0603654N, 0604230N Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 280.087 280.087 280.087 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 16.650 22.355 20.575 0.000 20.575 27.300 27.765 28.304 - - - - - - - - 16.650 22.355 20.575 0.000 20.575 27.300 27.765 28.304 To FY 2031 Complete - Total - 28.860 Continuing - Continuing - 28.860 Continuing - Continuing - - - - - - - - - - 16.650 22.355 20.575 0.000 20.575 27.300 27.765 28.304 28.860 Continuing Continuing 0.327 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.357 - 2.254 - 2.254 1.764 3.610 0.353 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Underwater Explosive Ordnance Disposal (EOD) program supplies EOD and maritime expeditionary forces with the necessary allowance outfitting, and diving and diving-related equipment aligned to fulfill assigned missions that includes Expeditionary Mine Countermeasures (ExMCM), and other maritime expeditionary missions. Most equipment must have inherently low acoustic and magnetic signatures to support maritime operations in the vicinity of influence fired ordnance. This funding supports outfitting the Navy's only comprehensive capability that can conduct full spectrum detect-to-engage ExMCM missions. Specifically, the (EOD) program supports EOD units worldwide as well as Mobile Diving and Salvage Units (MDSUs) and Naval Construction Forces (NCF) across the globe. The nature of the missions assigned to EOD and MCM forces under OPNAVINST 3501.97, Required Operational Capabilities & Projected Operational Environments (ROC/POE), require an aggregated set of systems and equipment to perform the wide range of mine countermeasures, underwater detection, location, investigation, force protection, exploitation, and neutralization tasks that comprise the mission set. The requirements for the procurement of each of these system suites are articulated in OPNAV approved requirements documents in accordance with DoD Directive 5000.2 and SECNAVINST 5000.2, and in accordance with the approved ExMCM ICD and ExMCM Concept of Operations. LI 0977 - Underwater EOD Equipment Navy UNCLASSIFIED Page 1 of 18 P-1 Line #21 Volume 1 - 427 === page 506 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0977 / Underwater EOD Equipment Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0603654N, 0604230N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Underwater EOD Programs P-5a, P-21 - / 169.654 - / 16.650 - / 22.355 - / 20.575 - / 0.000 - P-5 2 / Expeditionary Mine Countermeasures (ExMCM) P-5a, P-21 - / 110.433 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-40 Total Gross/Weapon System Cost - / 280.087 - / 16.650 - / 22.355 - / 20.575 - / 0.000 - / 20.575 / 20.575 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding is required to continue procurement and fielding of Underwater EOD program systems and equipment to outfit ExMCM Companies, EOD Units, MDSUs, and NCFs with advanced sensors and hardware required to accomplish their OPNAV approved missions. This equipment will allow warfighters to detect, locate, neutralize, and render safe unexploded ordnance including improvised explosive devices; conduct expeditionary salvage; and underwater construction missions. FY 2027 funding continues procurement of Maritime Expeditionary Standoff Response (MESR) Payload Kits and MESR Platforms. Funding also procures the next generation of Advanced Diver Integrated Sensors (STRIDENT), significantly increasing EOD diver capability to neutralize, destroy, or recover undersea mines. Future years also procure the next generation Remote Underwater Firing Initiation System (RUFIS), which uses acoustic signals to actuate energetic tools and detonate explosive payloads from large distances underwater, and the next generation underwater breathing apparatus. -CE 4.1.3 MK16 MOD 1 Product Improvement Program (PIP) also known as the MK16 MOD 3: OPNAV N957 direction to upgrade the fielded inventory of MK16 MOD 1 UBAs to MOD 3 UBAs and procure and upgrade additional UBAs as necessary to meet the inventory objective of 468. Unit Cost Increase in FY 2026 and FY 2027 reflects full unit build from scratch, versus previous component and subassembly replacement and improvement in existing fielded UBA units -CE 4.1.4 Next Generation Underwater Breathing Apparatus: direction to sustain the fielded inventory of MK16 MOD 1 UBAs and accelerate development and procurement of a next generation UBA for the EOD and expeditionary salvage force to inventory objective. Additionally, this line enables production engineering and integrated logistics support needed for all ExMCM Companies, EOD Units, MDSUs, and NCFs. These systems provide the only ExMCM capability in the US Navy. If not properly outfitted, these EOD forces will not be able to detect, locate, neutralize, and render safe underwater ordnance, sea mines, and other explosive hazards, which will significantly degrade Fleet Maneuver against near peer adversaries. Specifically, this procures the next generation of Advanced Diver Integrated Sensors (STRIDENT), significantly increasing EOD diver capability to neutralize, destroy, or recover undersea mines. LI 0977 - Underwater EOD Equipment Navy UNCLASSIFIED Page 2 of 18 P-1 Line #21 Volume 1 - 428 === page 507 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0977 / Underwater EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Underwater EOD Programs MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 16.650 22.355 20.575 0.000 20.575 - Gross/Weapon System Cost ($ in Millions) 169.654 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 169.654 Plus CY Advance Procurement ($ in Millions) - - - - - 16.650 22.355 20.575 0.000 20.575 - Total Obligation Authority ($ in Millions) 169.654 FY 2027 Total - - - - - 16.650 22.355 20.575 0.000 20.575 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - UQ019-MINE WARFARE VULENERABILITY IDENTIFICATION PROGRAM (MIW-VIP) Cost Recurring Cost (1) - - 3.123 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 3.123 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware UQ019-MINE WARFARE VULENERABILITY IDENTIFICATION PROGRAM (MIW-VIP) Cost - - 3.123 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 10 1.663 30 5.175 30 4.966 - - 0.000 30 4.966 1.1.1) MIW-VIP Hardware - UQ034 - U/W EOD & MCM SYSTEMS/EQUIPMENT Cost Recurring Cost 2.1.1) ExMCM EOD Response Remotely Operated Vehicle (ROV) 2.1.2) ADVANCED DIVER INTEGRATION SENSORS (e.g. 261,752.00 125 32.719 158,210.28 214 33.857 19,482.76 290 5.650 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - 3.252 - - 0.000 - - 0.000 - - 0.600 - - 0.000 - - 0.600 166,300.00 172,500.00 165,533.33 165,533.33 (†) (2) STRIDENT) 2.1.3) COMMAND DETONATION SYSTEM (RUFIS Receiver) (3) 2.1.5) INFLUENCE SIGNATURE REDUCTION - LI 0977 - Underwater EOD Equipment Navy UNCLASSIFIED Page 3 of 18 P-1 Line #21 Volume 1 - 429 === page 508 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0977 / Underwater EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Underwater EOD Programs MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 2.1.6) MESR PAYLOAD KITS Sensors (4) 2.1.7) MESR PAYLOAD KITS Kinetic Effects (5) 2.1.8) MESR PAYLOAD KITS - C3 Modules (6) 2.1.9) MESR PLATFORMS (†) (7) 2.1.11) MDSU RESPONSE REMOTELY OPERATED VEHICLE (ROV) 2.1.12) MDSU PRODUCTION ENGINEERING & TEST 2.1.13) NCF RESPONSE REMOTELY OPERATED VEHICLE (ROV) 2.1.14) NCF PRODUCTION ENGINEERING & TEST Unit Cost ($) - FY 2025 Total Cost Qty (Each) ($ M) - 0.000 190 2.542 - 0.000 350,000.00 21 7.350 330,000.00 7 2.310 13,378.95 - - - 330,000.00 7 Unit Cost ($) - FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) - 0.000 17,813.00 40 0.713 16,800.00 20 0.336 - - 0.000 16,800.00 20 0.336 35 0.509 14,825.00 40 0.593 13,950.00 20 0.279 - - 0.000 13,950.00 20 0.279 - 0.000 37,900.00 40 1.516 35,750.00 20 0.715 - - 0.000 35,750.00 20 0.715 11 3.927 364,150.00 20 7.283 343,550.00 20 6.871 - - 0.000 343,550.00 20 6.871 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.726 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.310 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 14,543.00 - 357,000.00 - - 1.172 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 11.967 - - 0.685 - - 0.650 - - 0.173 - - 0.000 - - 0.173 - - 3.441 - - 0.411 - - 0.100 - - 0.093 - - 0.000 - - 0.093 2.1.17) ExMCM Product Improvement - - 1.730 - - 0.230 - - 0.205 - - 0.096 - - 0.000 - - 0.096 Subtotal: Recurring Cost - - 109.026 - - 7.425 - - 16.235 - - 14.129 - - 0.000 - - 14.129 Subtotal: Hardware UQ034 - U/W EOD & MCM SYSTEMS/EQUIPMENT Cost - - 109.026 - - 7.425 - - 16.235 - - 14.129 - - 0.000 - - 14.129 2.1.15) PRODUCTION ENGINEERING & TEST (8) 2.1.16) INITIAL TRAINING (9) (10) Hardware - UQ035 - OUTFIT EOD/UMCM TOOLS & EQUIPMENT Cost LI 0977 - Underwater EOD Equipment Navy UNCLASSIFIED Page 4 of 18 P-1 Line #21 Volume 1 - 430 === page 509 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0977 / Underwater EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Underwater EOD Programs MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Recurring Cost 3.1.1) UW INTEGRATED SYSTEM INTERFACE - - 2.891 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 2.891 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware - UQ035 - OUTFIT EOD/UMCM TOOLS & EQUIPMENT Cost - - 2.891 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 8.026 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 0.693 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 405 7.140 55 6.120 56 6.446 - - 0.000 56 6.446 Hardware - UQ036 - DIVER SAFETY LIFE SUPPORT EQUIPMENT Cost Recurring Cost 4.1.1) MMUBA SUPPORT EQUIPMENT - 4.1.2) MMUBA EQUIPMENT - 99,000.00 4.1.3) MK 16 MOD 1 PRODUCT IMPROVEMENT 7 - - 0.000 4.1.5) PRODUCTION ENGINEERING AND TEST SERVICES - - 0.000 - - 2.085 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 8.719 - - 9.225 - - 6.120 - - 6.446 - - 0.000 - - 6.446 Subtotal: Hardware - UQ036 - DIVER SAFETY LIFE SUPPORT EQUIPMENT Cost - - 8.719 - - 9.225 - - 6.120 - - 6.446 - - 0.000 - - 6.446 PROGRAM (PIP) (†) 17,630.00 111,273.00 115,107.14 115,107.14 (11) Hardware - UQ037 - MARINE MAMMAL SYSTEM/EQUIPMENT Cost Recurring Cost 5.1.1) MMS FIELDING AND INVESTMENT - - 45.895 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 45.895 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware UQ037 - MARINE MAMMAL SYSTEM/EQUIPMENT Cost - - 45.895 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost - - 169.654 - - 16.650 - - 22.355 - - 20.575 - - 0.000 - - 20.575 (†) indicates the presence of a P-5a LI 0977 - Underwater EOD Equipment Navy UNCLASSIFIED Page 5 of 18 P-1 Line #21 Volume 1 - 431 === page 510 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0977 / Underwater EOD Equipment ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Underwater EOD Programs MDAP/MAIS Code: Footnotes: (1) CE 1.1.1 MIW-VIP: MIW-VIP measures magnetic and acoustic signatures of equipment that will be exposed to influence (magnetic and acoustic) ordnance in combat. This effort utilizes existing ranges and portable ranges (Forward Area Combined Degaussing and Acoustic Range (FACDAR)). Beginning in FY 2021 this cost element was eliminated. (2) CE 2.1.2 ADVANCED DIVER INTEGRATION SENSORS (e.g. STRIDENT): Provides for the procurement of a specialized EOD Diver underwater handheld sonar that is developed to operate in an influence fired ordnance environment. (3) CE 2.1.3 COMMAND DETONATION SYSTEMS (RUFIS Receiver): Provides for the procurement of improved underwater acoustic receivers to provide safe stand-off command detonation capabilities to Explosive Ordnance Disposal (EOD) divers. The improved receiver will address the current capability shortfalls of the legacy MK 58 receiver by improving the signal fidelity, receiving range, and interoperability with delivery systems. (4) CE 2.1.6 MESR PAYLOAD KITS - Sensors: Provides for the procurement of sensor-based payloads (e.g., acoustic, electro-optic, tactile, etc) that will be integrated onto MESR platforms to provide improved detection, localization, and identification capabilities when deployed in EOD Response missions. (5) CE 2.1.7 MESR PAYLOAD KITS - Kinetic Effects: Provides for the procurement of kinetic payloads (e.g., explosive disruptors, bulk charges, etc) that will be integrated onto MESR platforms to provide improved neutralization capabilities when deployed in EOD Response missions. (6) CE 2.1.8 MESR PAYLOAD KITS - C3 Modules: Provides for the procurement of command, control, and communication payloads (e.g., surface relays, acoustic modems, AI/ML algorithms, etc.) that will be integrated onto MESR platforms to provide improved safety stand-off and autonomous capabilities when deployed in EOD Response missions. (7) (8) CE 2.1.9 Provides procurement funding for Fleet outfitting. CE 2.1.9 MESR Platforms quantity and funding was added to increase program wholeness. CE 2.1.14 PRODUCTION ENGINEERING: Provides for production support, first article tests, and factory acceptance tests for EOD Response ROVs, MK16 PIP, STRIDENT, and other EOD equipment requiring additional production support. FY 2026 increase to support additional production engineering & test to the MESR, MK16 PIP, Next Gen UBA, and STRIDENT programs. FY 2026 increase to support additional production engineering & test to the MESR, MK16 PIP, and STRIDENT programs. (9) CE 2.1.15 TRAINING: Funding provides for training of MK16 PIP, MESR, and STRIDENT efforts. (10) (11) CE 2.1.16 PRODUCT IMPROVEMENT: Provides for engineering services to improve fielded EOD Diver systems and ROVs. CE 4.1.3 MK 16 MOD 1 PRODUCT IMPROVEMENT PROGRAM (PIP): The MK 16 Mod 1 Product Improvement Plan (PIP) provides targeted improvements to MK 16 MOD 1 hardware and software where obsolescence issues require it. The Navy is sustaining and, where necessary, improving the MK 16 , while accelerating the test, evaluation and delivery of next generation UBAs to meet Fleet capability and capacity shortfalls earlier and at lower costs. Unit Cost Increase in FY26 and FY27 reflects full unit build from scratch, versus previous component and subassembly replacement and improvement in existing fielded UBA units LI 0977 - Underwater EOD Equipment Navy UNCLASSIFIED Page 6 of 18 P-1 Line #21 Volume 1 - 432 === page 511 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 O O C Cost Elements Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Underwater EOD Programs Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2024 Cardinal Point Captains, INC / SAN DIEGO, CALIFORNIA C / FFP Various Nov 2023 Nov 2024 30 158,233.00 Y 2025 Cardinal Point Captains, INC / SAN DIEGO, CALIFORNIA C / FFP Various Nov 2024 Nov 2025 10 166,300.00 Y 2026 Cardinal Point Captains, INC / SAN DIEGO, CALIFORNIA C / FFP Various Nov 2025 Nov 2026 30 172,500.00 Y 2027 Cardinal Point Captains, INC / SAN DIEGO, CALIFORNIA C / FFP Various Nov 2026 Nov 2027 30 165,533.33 Y (†) 2025 VIDEORAY LLC. / TBD C / FFP NIWPAC Nov 2024 Nov 2024 11 357,000.00 Y (†) 2.1.9) MESR PLATFORMS 2026 VIDEORAY LLC. / TBD C / FFP NIWPAC Nov 2025 Nov 2025 20 364,150.00 Y 2.1.9) MESR PLATFORMS 2027 VIDEORAY LLC. / TBD C / FFP NIWPAC Nov 2026 Nov 2026 20 343,550.00 Y 4.1.3) MK 16 MOD 1 PRODUCT IMPROVEMENT PROGRAM 2025 NSWC PC / Florida, USA C / FFP FLORIDA, USA Nov 2024 Nov 2025 405 17,630.00 Y 2026 NSWC PC / Florida, USA C / FFP FLORIDA, USA Aug 2026 Aug 2027 55 111,273.00 Y 2027 NSWC PC / Florida, USA C / FFP FLORIDA, USA Jun 2027 Jun 2028 56 115,107.14 Y 2.1.2) ADVANCED DIVER INTEGRATION SENSORS (e.g. STRIDENT) (†) 2.1.2) ADVANCED DIVER INTEGRATION SENSORS (e.g. STRIDENT) (†) 2.1.2) ADVANCED DIVER INTEGRATION SENSORS (e.g. STRIDENT) (†) 2.1.2) ADVANCED DIVER INTEGRATION SENSORS (e.g. STRIDENT) (†) 2.1.9) MESR PLATFORMS (†) (PIP) 4.1.3) MK 16 MOD 1 PRODUCT IMPROVEMENT PROGRAM (†) (PIP) 4.1.3) MK 16 MOD 1 PRODUCT IMPROVEMENT PROGRAM (†) (PIP) (†) P-1 Line Item Number / Title: 0977 / Underwater EOD Equipment (Each) RFP Issue Date indicates the presence of a P-21 LI 0977 - Underwater EOD Equipment Navy UNCLASSIFIED Page 7 of 18 P-1 Line #21 Volume 1 - 433 === page 512 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0977 / Underwater EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Underwater EOD Programs Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V 2.1.2) ADVANCED DIVER INTEGRATION SENSORS (e.g. STRIDENT) D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (2) Prior Years Deliveries: 184 1 2024 NAVY 30 0 30 1 2025 NAVY 10 0 10 1 2026 NAVY 30 0 30 30 1 2027 NAVY 30 0 30 30 2.1.9) MESR PLATFORMS A - - - - - - - - - - - - 30 0 A - - - - - - - - - - - 10 (7) Prior Years Deliveries: 21 2 2025 NAVY 11 0 11 2 2026 NAVY 20 0 20 A11 4.1.3) MK 16 MOD 1 PRODUCT IMPROVEMENT PROGRAM (PIP) 3 2025 NAVY 405 0 405 3 2026 NAVY 55 0 55 3 2027 NAVY 56 0 56 0 20 (11) A - - - - - - - - - - - 405 55 56 O C T LI 0977 - Underwater EOD Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #21 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 434 === page 513 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0977 / Underwater EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Underwater EOD Programs Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V 2.1.2) ADVANCED DIVER INTEGRATION SENSORS (e.g. STRIDENT) D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N Calendar Year 2027 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (2) Prior Years Deliveries: 184 1 2024 NAVY 30 30 0 1 2025 NAVY 10 0 10 1 2026 NAVY 30 0 30 1 2027 NAVY 30 0 30 2.1.9) MESR PLATFORMS 0 - 10 0 A - - - - - - - - - - - - 30 0 A - - - - - - - - - - - 30 (7) Prior Years Deliveries: 21 2 2025 NAVY 11 11 0 2 2026 NAVY 20 0 20 0 A20 4.1.3) MK 16 MOD 1 PRODUCT IMPROVEMENT PROGRAM (PIP) 3 2025 NAVY 405 0 405 3 2026 NAVY 55 0 55 3 2027 NAVY 56 0 56 - 0 (11) 405 0 A - O C T LI 0977 - Underwater EOD Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #21 M A R A P R M A Y - - 55 A - - - J U N J U L A U G 0 - 56 S E P Volume 1 - 435 === page 514 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0977 / Underwater EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Underwater EOD Programs Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V 2.1.2) ADVANCED DIVER INTEGRATION SENSORS (e.g. STRIDENT) D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (2) Prior Years Deliveries: 184 1 2024 NAVY 30 30 0 0 1 2025 NAVY 10 10 0 0 1 2026 NAVY 30 30 0 1 2027 NAVY 30 0 30 2.1.9) MESR PLATFORMS 0 - 30 0 (7) Prior Years Deliveries: 21 2 2025 NAVY 11 11 0 2 2026 NAVY 20 20 0 0 0 4.1.3) MK 16 MOD 1 PRODUCT IMPROVEMENT PROGRAM (PIP) 3 2025 NAVY 405 405 0 3 2026 NAVY 55 55 0 3 2027 NAVY 56 0 56 (11) 0 0 O C T LI 0977 - Underwater EOD Equipment Navy N O V D E C J A N F E B M A R A P R M A Y 56 J U N 0 J U L A U G UNCLASSIFIED Page 10 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #21 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 436 === page 515 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0977 / Underwater EOD Equipment Item Number / Title [DODIC]: 1 / Underwater EOD Programs Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Cardinal Point Captains, INC - SAN DIEGO, CALIFORNIA TBD 2 VIDEORAY LLC. - TBD 3 NSWC PC - Florida, USA ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 0 0 0 0 0 0 0 0 TBD 0 0 0 0 0 0 0 0 TBD 0 0 0 0 0 0 0 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0977 - Underwater EOD Equipment Navy UNCLASSIFIED Page 11 of 18 P-1 Line #21 Volume 1 - 437 === page 516 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0977 / Underwater EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Expeditionary Mine Countermeasures (ExMCM) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 0.000 0.000 0.000 0.000 0.000 - Gross/Weapon System Cost ($ in Millions) 110.433 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 110.433 Plus CY Advance Procurement ($ in Millions) - - - - - 0.000 0.000 0.000 0.000 0.000 - Total Obligation Authority ($ in Millions) 110.433 FY 2027 Total - - - - - 0.000 0.000 0.000 0.000 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Hardware - UQ038 Expeditionary Mine Countermeasures (ExMCM) Cost Recurring Cost 1.1.1) MK18 MOD 1 (†) UUV (0207404N) 1.1.2) MK18 MOD 1 UMCM UUV INCREMENTAL (CIP) RETROFIT KIT (0207404N) (†) (SSAM) (0207404N) 1.1.4) MK18 MOD 2 RETROFIT KITS (ATLAS) 15.055 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1,072K 5 5.360 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 600,000.00 15 9.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 400,000.00 4 1.600 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 394,887.85 107 42.253 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 294,557.38 61 17.968 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 (†) 1.1.5) ExMCM AUX/ SUPPORT/MAINT/ (†) MSE KITS 1.1.6) ExMCM EOD RESPONSE REMOTELY OPERATED VEHICLE (ROV) 35 (†) 1.1.3) MK18 MOD 2 RETROFIT KITS (0207404N) 430,142.86 (†) LI 0977 - Underwater EOD Equipment Navy UNCLASSIFIED Page 12 of 18 P-1 Line #21 Volume 1 - 438 === page 517 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0977 / Underwater EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Expeditionary Mine Countermeasures (ExMCM) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) 1.1.7) PRODUCTION ENGIENEERING & TEST - - 0.990 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.8) ExMCM TOA EQUIPMENT - - 9.057 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.9) ExMCM DIVER EQUIPMENT - - 9.150 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 110.433 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Hardware UQ038 Expeditionary Mine Countermeasures (ExMCM) Cost - - 110.433 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost - - 110.433 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Remarks: [Hardware/Recurring] [Hardware/Recurring] ExMCM Outfitting: This funding resources the procurement of Expeditionary systems and support equipment. Procurement of this equipment will allow the ExMCM forces to be deployed globally and employed from a wide variety of shipboard platforms at sea as well as small craft in performing EOD and EXMCM missions in support of global requirements. The various ExMCM outfitting kits comprise the ancillary and support equipment necessary to outfit an ExMCM Company with equipment based on approved Tables of Allowances (TOAs) and are procured from a variety of OEMs and sources. (†) indicates the presence of a P-5a LI 0977 - Underwater EOD Equipment Navy UNCLASSIFIED Page 13 of 18 P-1 Line #21 Volume 1 - 439 === page 518 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 O O C Item Number / Title [DODIC]: 2 / Expeditionary Mine Countermeasures (ExMCM) FY Contractor and Location Method/Type or Funding Vehicle 2019 HYDROID / POCASSET, MA C / FFP NSWCIH, MD Nov 2018 Nov 2019 12 440,000.00 Y 2020 HYDROID / POCASSET, MA C / FFP NSWCIH, MD Jan 2020 Jan 2021 12 449,000.00 Y 2020 HYDROID / POCASSET, MA C / FFP NSWCIH, MD Nov 2019 Nov 2020 5 1,072K Y 2020 HYDROID / POCASSET, MA C / FFP NSWCIH, MD Mar 2020 Mar 2021 15 600,000.00 Y 1.1.4) MK18 MOD 2 RETROFIT KITS (ATLAS) (0207404N) 2020 HYDROID / POCASSET, MA C / FFP NSWCIH, MD Mar 2020 Mar 2021 4 400,000.00 Y 1.1.5) ExMCM AUX/SUPPORT/ MAINT/MSE KITS 2018 VARIOUS / VARIOUS C / FFP NSWCIH, MD Oct 2017 Oct 2017 25 390,000.00 Y 1.1.5) ExMCM AUX/SUPPORT/ MAINT/MSE KITS 2019 VARIOUS / VARIOUS C / FFP NSWCIH, MD Mar 2019 Mar 2020 35 416,142.86 Y 1.1.5) ExMCM AUX/SUPPORT/ MAINT/MSE KITS 2020 VARIOUS / VARIOUS C / FFP NSWCIH, MD Mar 2020 Mar 2021 11 413,545.45 Y 1.1.6) ExMCM EOD RESPONSE REMOTELY OPERATED VEHICLE (ROV) 2020 U.S. ARMY / VARIOUS C / FFP PICATINNY ARSENAL, NJ Mar 2020 Mar 2021 15 259,133.33 Y 1.1.6) ExMCM EOD RESPONSE REMOTELY OPERATED VEHICLE (ROV) 2021 U.S. ARMY / VARIOUS C / FFP PICATINNY ARSENAL, NJ Mar 2021 Mar 2022 7 262,411.76 Y 1.1.6) ExMCM EOD RESPONSE REMOTELY OPERATED VEHICLE (ROV) 2022 U.S. ARMY / VARIOUS C / FFP PICATINNY ARSENAL, NJ Mar 2022 Mar 2023 12 277,000.00 Y 1.1.6) ExMCM EOD RESPONSE REMOTELY OPERATED VEHICLE (ROV) 2023 U.S. ARMY / VARIOUS C / FFP PICATINNY ARSENAL, NJ Mar 2023 Mar 2024 25 330,000.00 Y Cost Elements 1.1.1) MK18 MOD 1 UUV (†) (0207404N) 1.1.1) MK18 MOD 1 UUV (†) (0207404N) 1.1.2) MK18 MOD 1 UMCM UUV INCREMENTAL (CIP) RETROFIT KIT (0207404N) (†) 1.1.3) MK18 MOD 2 RETROFIT (†) KITS (SSAM) (0207404N) (†) P-1 Line Item Number / Title: 0977 / Underwater EOD Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 0977 - Underwater EOD Equipment Navy UNCLASSIFIED Page 14 of 18 P-1 Line #21 Volume 1 - 440 === page 519 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0977 / Underwater EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 2 / Expeditionary Mine Countermeasures (ExMCM) Fiscal Year 2018 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2017 1 OCT Calendar Year 2018 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2019 M A Y J U N J U L Calendar Year 2019 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) MK18 MOD 1 UUV (0207404N) Prior Years Deliveries: 11 1 2019 NAVY 12 0 12 1 2020 NAVY 12 0 12 A - - - - - - - - - - - 12 12 1.1.2) MK18 MOD 1 UMCM UUV INCREMENTAL (CIP) RETROFIT KIT (0207404N) 2 2020 NAVY 5 0 5 5 1.1.3) MK18 MOD 2 RETROFIT KITS (SSAM) (0207404N) 3 2020 NAVY 15 0 15 15 O C T LI 0977 - Underwater EOD Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #21 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 441 === page 520 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0977 / Underwater EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 2 / Expeditionary Mine Countermeasures (ExMCM) Fiscal Year 2020 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2019 1 OCT Calendar Year 2020 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2021 M A Y J U N J U L Calendar Year 2021 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) MK18 MOD 1 UUV (0207404N) Prior Years Deliveries: 11 1 2019 NAVY 12 0 12 1 2020 NAVY 12 0 12 - 1 1 1 1 1 1 1 1 1 1 1 1 A - - - - - - - - - - - - - - - - - - - - 0 - - 1 1 1 1 1 1 1 1 1 1 1 1 3 1.1.2) MK18 MOD 1 UMCM UUV INCREMENTAL (CIP) RETROFIT KIT (0207404N) 2 2020 NAVY 5 0 5 A - - 1 1 0 1.1.3) MK18 MOD 2 RETROFIT KITS (SSAM) (0207404N) 3 2020 NAVY 15 0 15 A O C T LI 0977 - Underwater EOD Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #21 1 M A R 1 A P R 1 M A Y 1 J U N 1 J U L 1 A U G 1 S E P Volume 1 - 442 8 === page 521 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0977 / Underwater EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 2 / Expeditionary Mine Countermeasures (ExMCM) Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Fiscal Year 2023 Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.1.1) MK18 MOD 1 UUV (0207404N) Prior Years Deliveries: 11 1 2019 NAVY 12 12 0 1 2020 NAVY 12 9 3 0 1 1 1 0 1.1.2) MK18 MOD 1 UMCM UUV INCREMENTAL (CIP) RETROFIT KIT (0207404N) 2 2020 NAVY 5 5 0 0 1.1.3) MK18 MOD 2 RETROFIT KITS (SSAM) (0207404N) 3 2020 NAVY 15 7 8 1 O C T LI 0977 - Underwater EOD Equipment Navy 1 N O V 2 D E C 2 J A N 2 F E B 0 M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #21 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 443 === page 522 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0977 / Underwater EOD Equipment Item Number / Title [DODIC]: 2 / Expeditionary Mine Countermeasures (ExMCM) Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 1 HYDROID - POCASSET, MA TBD 0 0 0 0 0 0 0 0 2 HYDROID - POCASSET, MA TBD 0 0 0 0 0 0 0 0 3 HYDROID - POCASSET, MA TBD 0 0 0 0 0 0 0 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0977 - Underwater EOD Equipment Navy UNCLASSIFIED Page 18 of 18 P-1 Line #21 Volume 1 - 444 === page 523 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0981 / Items less than $5 Million Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 760.608 760.608 760.608 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 66.346 12.691 69.425 0.000 69.425 70.595 77.267 79.624 - - - - - - - - 66.346 12.691 69.425 0.000 69.425 70.595 77.267 79.624 - - - - - - - - 66.346 12.691 69.425 0.000 69.425 70.595 77.267 79.624 To FY 2031 Complete 81.205 Continuing - Continuing - 81.205 Continuing - Total - Continuing - - 81.205 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget provides for "S" cognizance (Shipboard, Hull, Mechanical & Electrical (HM&E) equipment for surface ships and aircraft carriers) which are not in any specific category. This equipment accomplishes program alterations for installation during CNO and Fleet availabilities, fills Fleet requisitions from casualties and attrition, provide tech refresh upgrades, and replaces obsolete equipment. Primary objectives are to maintain or improve readiness, safety, reliability, reduce workload, lower maintenance costs, improve sailor quality of life, and/or sustain ship classes through their notional life or beyond. The budget purchases and installs various equipment including machinery pumps, generators, ship propellers and shafts, air compressors, davits, A/C Plants, and steam propulsion items. It also procures allowance items as required by the Coordinated Shipboard Allowance List (COSAL). Major programs are the CVN Class Machinery Plant Upgrades, MACHALTs, CVN Cybersecurity, and CVN 78 class upgrades. FY 2026 Spend Plan amount for Items Less than $5 Million includes $12,691 thousand of discretionary and $7,400 thousand of mandatory (reconciliation) for a total of $20,091 thousand. This supports HPAC Battle & Program Insurance Spares. [P40A / LT060 - MACHALTs]: The Machinery Alteration (MACHALT) Program supports identification, procurement, and installation of Hull, Mechanical and Electrical (HM&E) internal equipment and system improvements on in-service surface ships. The MACHALT Program is a single source for system level Ship Change Document (SCD) deployment outside of CNO availabilities and is a turn-key modification and alteration vehicle that supplies all required engineering, equipment, logistics, installation, management, tracking, reporting, scheduling, special tools and/or procedures, and Ship's Force training. MACHALTs are installed via the Navy Modernization Process (NMP) in the following priority order: (1) Mandatory Safety/Statutory, (2) Component-level installations targeting risk to TYCOM operational redlines, (3) Safety, (4) Readiness, Maintainability and Availability, and (5) Obsolescence Alts. The program seamlessly integrates small modernization upgrades into ship maintenance Window(s) of Opportunity (WOO) or Continuous Maintenance Availability (CMAV) periods. Beginning in FY 2025, Low Pressure Air Compressor (LPAC) Programmable Logistic Controller (PLC) Navy Common Core Controller (NC3) shipset installations will be accelerated on DDG-51 class ships to improve reliability and performance of the compressor air systems, meet Operational Redlines, and improve Fleet Readiness to critical ship systems. Due to Fleet usage, requirements, and alignment of availability periods in a given year, adjustments are made to quantities and items throughout the Future Years Defense Program (FYDP). Program execution improves system reliability/maintainability/availability, reduces Diminishing Manufacturing Sources Material Shortages (DMSMS)/obsolescence risk, drives increased commonality, and reduces life cycle cost. [P40A / LT115 Additive Manufacturing]: Additive Manufacturing (AM) program to procure and install AM Equipment on Navy Platforms to increase Self-Sufficiency and establishment of Intermediate Repair Shop. [P40A / Additive Manufacturing]: FY27 increased funding for Advanced Manufacturing (AdvM) at NAVSEA and Fleets to enable the stand-up and operation of a metal and polymer AdvM training facility to provide the required training to operate hybrid metal AdvM and polymer systems installed on ships. LI 0981 - Items less than $5 Million Navy UNCLASSIFIED Page 1 of 14 P-1 Line #22 Volume 1 - 445 === page 524 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0981 / Items less than $5 Million Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / LT120 - Carrier Propulsion Plant Inspection]: Funds are used to procure the latest technology inspection system tooling, i.e., laser-optic, ultrasonic, fiber-optic, electro-optic and computed radiography inspection systems. [P40A / LT330 - CVN Cybersecurity]: CVN Cyber Security enables the development and installation of Ship Change Documents (SCDs) for Boundary Defense Capability (BDC), Situational Awareness, and Physical Security. It increases the Defense in Depth and improves the Cyber Security aspects of the CVN Nimitz Class HM&E Networks. Funding is used to update hardware and software applications and system configurations required for compatibility with the Department of War (DoW) CYBER requirements, Security Technical Implementation Guide, and other CYBER requirements. Funding is also used to update system cybersecurity Certification and Accreditation; add capability to protect, detect, and respond/recover to internal system events; and add additional defense in depth and monitoring to external interfaces. [P40A / LT331 CVN 78 Class Modernization]: CVN 78 Class funding will cover Contractor Furnished Equipment (CFE) modernizations in future availabilities to include: Dual Band Radar Capacitor Bank, Plastic Waste Compressed Melt Units, Waste Pulpers, Waste disinfection equipment, Plasma Arc Waste Destruction System (PAWDS) Exhaust piping, Vacuum Collection Holding and Transfer (VCHT) pumps, Hangar Bay and Flight Deck Speakers, Machinery Control and Monitoring System upgrades, Steering Control System upgrades, Jet Blast Deflector (JBD) electro mechanical actuators (EMA) and emergency lowering capability, Aviation support efforts (to include: Mission Bay and Ready rooms, MH-60 equipment stowage, Flight equipment stowage/maintenance work center) and Passive Countermeasures System material. [P40A / LT335 CVN Training and Equipment]: This funding procures spare equipment, propulsion shafts, and propellers with long repair turn-around times to support a change in maintenance philosophy from inspection and repair to remove and replace in order to significantly reduce in-schedule risk to CNO maintenance periods. Funding will be used to replace antiquated equipment and provide a technology refresh in the machine shops on the CVN-68 class carriers. Funding will also be used to replace outmoded and obsolete Training Test Equipment in established Navy schools, as identified in approved or draft Navy Training System Plans (NTSPs) as well as procure state-of-the-art, mobile and reconfigurable instructional facility, positioned at the point of need to support Sailor 2025 and Ready Relevant Learning (RRL). [P40A / LT830 - Carrier Production Engineering]: The review and approval of any production contract technical documentation, or the separate development of this documentation, to include Technical Manuals, Planned Maintenance System (PMS), Level III Production Drawings, Provisioning Technical Documentation (PTD), Program Support Data (PSD), Allowance Parts List (APL); and engineering support for final design reviews. [P3A / LT160 - Machinery Plant Upgrades]: The Machinery Plant Upgrade project within the CVN Fleet Modernization Program (FMP) encompasses CVN Machinery Control Systems, Ship Control (Navigation/ Steering), Integrated Voice Control Networks, Announcing Systems and Shipboard Air Traffic Control Communication Systems. The machinery plant upgrade modernization alterations currently consist of greater than 40 different Ship Change Documents (SCD) with a cost value of approximately $42M for all the alterations combined. Individual SCDs can range in cost from $5K (for software only changes) to ~ $14M for major system upgrade procurements. The range of SCD installs can cost as low as $100K and as high as $4M for individual SCDs. During each CNO availability, we schedule and complete a subset of these 40+ alterations. Each hull is different receiving varying subsets of the 40+ SCDs depending on individual ship configurations. These alts are scheduled for installation over 3-4 availabilities (which may be 9-12 years) with many installations occurring in later years of the FYDP. Additionally, the machinery plant upgrade program is technology driven and many alterations are still being finalized in the Navy modernization Program (i.e. Ship Change Document (SCD) development) process for installation in later years. New SCDs continue to be developed to proactively address obsolescence issues associated with ever changing technology. [P3A - 2 / LT314 - Carrier Oil Water Separator]: Enhanced Oil Water Separator (OWS) systems are being installed on the CVN68 Class carriers to meet the new environmental discharge law of 15 parts per million (ppm) worldwide. The new OWS systems include an oil content monitor and a bilge stripping structure. The new system is expected to reduce costly maintenance and reliability issues. [P3A - 3 / LT327 - Modular Refrigeration System.]: Modular Refrigeration System (MRS) replaces the existing legacy Ship's Stores Refrigeration System (SSRS) onboard CVN68 Class carriers. The legacy system is energy inefficient, space inefficient, and maintenance intensive, requiring highly skilled personnel to operate and maintain acceptable box temperatures. Most hardware associated with the legacy systems is specialized mil-spec and is either becoming unsupportable due to obsolescence or is grossly expensive to maintain. Each MRS is comprised of a Modular Refrigeration Unit (MRU), an operating/ diagnostic control panel, and small chilled water cooled flat-plate condenser. There are 18 MRUs required per hull. MRS's are self-contained hatchable MRUs with a dedicated control panel that eliminate 90% of current maintenance requirements and require minimal operator support/training. LI 0981 - Items less than $5 Million Navy UNCLASSIFIED Page 2 of 14 P-1 Line #22 Volume 1 - 446 === page 525 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0981 / Items less than $5 Million Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Items Less than $5M Programs - / 363.522 - / 43.058 - / 12.691 - / 48.150 / - - / 48.150 P-3a 1 / LT160 - Machinery Plant Upgrades (TBD) - / 338.647 - / 23.288 - / 0.000 - / 21.275 - / 0.000 - / 21.275 P-3a 2 / LT314 - Carrier Oil Water Separator (TBD) - / 38.672 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-3a 3 / LT327 - Modular Refrigeration System. (TBD) - / 19.767 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-40 Total Gross/Weapon System Cost - / 760.608 - / 66.346 - / 12.691 - / 69.425 - / 0.000 - / 69.425 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code - FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Items Less than $5M Programs P-3a 1 / LT160 - Machinery Plant Upgrades (TBD) - - / 22.503 / - - / 22.553 / - - / 23.919 / - - / 24.690 / - Continuing - / - Continuing - / - P-3a 2 / LT314 - Carrier Oil Water Separator (TBD) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 38.672 P-3a 3 / LT327 - Modular Refrigeration System. (TBD) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 19.767 P-40 Total Gross/Weapon System Cost - / 70.595 - / 77.267 - / 79.624 - / 81.205 Continuing Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. LI 0981 - Items less than $5 Million Navy UNCLASSIFIED Page 3 of 14 P-1 Line #22 Volume 1 - 447 === page 526 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0981 / Items less than $5 Million Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Items Less than $5M Programs FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) LT060 - MACHALTs 1.1) MACHALTs (Amphibs) A 1.2) MACHALTs A (Surface Ships) (1) Subtotal: 1) LT060 - MACHALTs 2) LT115 Additive Manufacturing 2.1) Additive Manufacturing (3) - - 21.853 - - 0.738 - - 0.815 - - 1.969 - - - - - 1.969 - - 127.527 - - 7.330 - - 8.464 - - 8.271 - - - - - 8.271 - - 149.380 - - 8.068 - - 9.279 - - 10.240 - - - - - 10.240 - - 1.705 - - 3.019 - - 2.412 - - 5.783 - - - - - 5.783 - - 1.705 - - 3.019 - - 2.412 - - 5.783 - - - - - 5.783 - - 2.903 - - 0.170 - - - - - 0.170 - - - - - 0.170 - - 2.903 - - 0.170 - - - - - 0.170 - - - - - 0.170 - - 84.904 - - 13.760 - - - - - 11.246 - - - - - 11.246 - - 84.904 - - 13.760 - - - - - 11.246 - - - - - 11.246 - - 110.142 - - - - - - - - 18.571 - - - - - 18.571 - - 110.142 - - - - - - - - 18.571 - - - - - 18.571 - - 13.810 - - 17.836 - - - - - 2.100 - - - - - 2.100 - - 13.810 - - 17.836 - - - - - 2.100 - - - - - 2.100 - - 0.678 - - 0.040 - - - - - 0.040 - - - - - 0.040 - - 0.678 - - 0.040 - - - - - 0.040 - - - - - 0.040 - - - - - 0.165 - - - - - - - - - - - - - - 0.000 - - 0.165 - - - - - - - - - - - - (2) A Subtotal: 2) LT115 Additive Manufacturing 3) LT120 - Carrier Propulsion Plant Inspection 3.1) Propulsion Plant Inspection A Subtotal: 3) LT120 - Carrier Propulsion Plant Inspection 4) LT330 - CVN Cybersecurity 4.1) LT330 - CVN Cybersecurity (4) A Subtotal: 4) LT330 - CVN Cybersecurity 5) LT331 CVN 78 Class Modernization 5.1) LT 331 CVN78 CL A Subtotal: 5) LT331 CVN 78 Class Modernization 6) LT335 CVN Training and Equipment 6.1) CVN Training and Equipment (5) A Subtotal: 6) LT335 CVN Training and Equipment 7) LT830 - Carrier Production Engineering 7.1) Production Engineering A Subtotal: 7) LT830 - Carrier Production Engineering 8) Sport Utility Vehicles 8.1) BSVE-0305-04SUV 4X4 FULLSIZE 8501 UP TO 16000 GVWR SIN 108 A Subtotal: 8) Sport Utility Vehicles LI 0981 - Items less than $5 Million Navy UNCLASSIFIED Page 4 of 14 P-1 Line #22 Volume 1 - 448 === page 527 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0981 / Items less than $5 Million Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) 9) LT341 Centrifuge Purifiers for Surface Combatant Vessels 9.1) Final Review of Centrifuge Purifiers A FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: Items Less than $5M Programs FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) (6) - - - - - - - - 1.000 - - - - - - - - - Subtotal: 9) LT341 Centrifuge Purifiers for Surface Combatant Vessels - - 0.000 - - - - - 1.000 - - - - - - - - - Total - - 363.522 - - 43.058 - - 12.691 - - 48.150 - - - - - 48.150 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (1) Funds provided to support the acceleration of procuring and installing 42 Attached Lubricating Oil / Hydraulic Oil Pump (ALOP/AHOP) Flexible Coupling shipsets. Operating the Main Reduction Gear (MRG) with the existing non-functioning ALOP increases the risk of gear and bearing damage. By replacing these couplings, adequate lubrication will be provided to the MRG bearings and gear-teeth during a "loss of electrical power" casualty, preventing immediate and severe coast-down damage, increases readiness, and provides material support for a critical item. (2) (3) Additive Manufacturing (AM) program to procure and install AM Equipment on Navy Platforms to increase Self-Sufficiency and establishment of Intermediate Repair Shop. Establishing a training operation is crucial to ensure sailors are proficient in operating shipboard AdvM equipment, preventing skill gaps, and maximizing the operational benefits of expanding AdvM assets across the Fleet. Facility will be co-located within the PEO SSBN AdvM Center of Excellence in Danville, VA. It will provide training for up to 48 sailors per year to proficiently operate these new AdvM capabilities. (4) Effort provides cybersecurity for carrier assets and infrastructure with emphasis to prevent network intrusion on CVNs. Efforts consists of (1) boundary defense mods, (2) situational awareness mods, and (3) physical security mods. Quantities vary per hull and are fundamentally different. Hulls will receive different modifications in varying combinations; each hull cost is mutually exclusive of other costs. (5) The FY 2027 CVN Training and Equipment increase reflects a profile adjustment in accordance with the Chief of Naval Operations (CNO) Naval Sustainment Plan Shipyard (NSS-SY) Planning pillar. This adjustment reallocates funding for material procurements to support emergent carrier replacement repairs. (6) Provides additional support for this program as part of the "final review" for this effort. LI 0981 - Items less than $5 Million Navy UNCLASSIFIED Page 5 of 14 P-1 Line #22 Volume 1 - 449 === page 528 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0981 / Items less than $5 Million ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / LT160 - Machinery Plant Upgrades MDAP/MAIS Code: Prior Years 338.647 338.647 338.647 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 23.288 0.000 21.275 0.000 21.275 22.503 22.553 23.919 - - - - - - - - 23.288 0.000 21.275 0.000 21.275 22.503 22.553 23.919 - - - - - - - - 23.288 0.000 21.275 0.000 21.275 22.503 22.553 23.919 To FY 2031 Complete 24.690 Continuing - Continuing - 24.690 Continuing - Total - Continuing - - 24.690 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: LT160 - MACHINERY PLANT UPGRADES - The Machinery Plant Upgrade project within the CVN Fleet Modernization Program (FMP) encompasses CVN Machinery Control Systems, Ship Control (Navigation/ Steering), Integrated Voice Control Networks, Announcing Systems and Shipboard Air Traffic Control Communication Systems. The machinery plant upgrade modernization alterations currently consist of greater than 40 different Ship Change Documents (SCD) with a cost value of approximately $42M for all the alterations combined. Individual SCDs can range in cost from $5K (for software only changes) to ~ $14M for major system upgrade procurements. The range of SCD installs can cost as low as $100K and as high as $4M for individual SCDs. During each CNO availability, we schedule and complete a subset of these 40+ alterations. Each hull is different receiving varying subsets of the 40+ SCDs depending on individual ship configurations. These alts are scheduled for installation over 3-4 availabilities (which may be 9-12 years) with many installations occurring in later years of the FYDP. Additionally, the machinery plant upgrade program is technology driven and many alterations are still being finalized in the Navy modernization Program (i.e. Ship Change Document (SCD) development) process for installation in later years. New SCDs continue to be developed to proactively address obsolescence issues associated with ever changing technology. LI 0981 - Items less than $5 Million Navy UNCLASSIFIED Page 6 of 14 P-1 Line #22 Volume 1 - 450 === page 529 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0981 / Items less than $5 Million Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / LT160 - Machinery Plant Upgrades MDAP/MAIS Code: Models of Systems Affected: Machinery Plant Upgrades Prior Years Modification Type: TBD FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: LT160 - Machinery Plant Upgrades B Kits Recurring 1.1.1) Machinery Plant Upgrades - NonOrganic (7) Subtotal: Recurring Subtotal: LT160 - Machinery Plant Upgrades Subtotal: Procurement, All Modification Items 56 / 125.934 - / 125.934 - 56 / 125.934 4 / 7.884 - / - / 7.884 - / - 4 / 7.884 - / - / 7.884 - / - - / 125.934 Modification Item 1 of 1: LT160 - Machinery Plant Upgrades - / 212.713 - / 15.404 Subtotal: Installation - / 212.713 - / 15.404 - - - 4 / 7.981 - / - / 7.981 - / - 4 / 7.981 - / - / 7.981 - / - 4 / 7.981 - 4 / 8.129 / 7.981 - 4 / 7.981 - 4 / 8.150 / 8.129 - 4 / 8.129 / 7.981 - 4 / 9.109 / 8.150 - 4 / 8.150 / 8.129 - / 9.109 - 4 / 9.109 / 8.150 - / 9.109 - 4 / 9.589 Continuing Continuing / 9.589 Continuing Continuing 4 / 9.589 Continuing Continuing / 9.589 Continuing Continuing Installation - / 0.000 - / 13.294 / - - / 13.294 - / 0.000 - / 13.294 - / 14.374 - / 14.403 - / 14.810 - / 15.101 - / 12.000 - / 312.099 / - - / 13.294 - / 14.374 - / 14.403 - / 14.810 - / 15.101 - / 12.000 - / 312.099 - Total Total Cost (Procurement + Support + Installation) LI 0981 - Items less than $5 Million Navy 338.647 23.288 0.000 21.275 0.000 UNCLASSIFIED Page 7 of 14 21.275 22.503 22.553 P-1 Line #22 23.919 24.690 Continuing Continuing Volume 1 - 451 === page 530 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0981 / Items less than $5 Million Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / LT160 - Machinery Plant Upgrades MDAP/MAIS Code: Modification Item 1 of 1: LT160 - Machinery Plant Upgrades Manufacturer Information Manufacturer Name: various Manufacturer Location: various Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 5 Dates FY 2025 Contract Dates Delivery Dates FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Nov 2024 Nov 2026 Nov 2027 Nov 2028 Nov 2029 Nov 2030 Apr 2025 Apr 2027 Apr 2028 Apr 2029 Apr 2030 Apr 2031 Installation Information Method of Implementation: AIT:: Installation Name: Machinery Plant Upgrades Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - Prior Years 54 / 209.313 2 / 6.714 - / - - / - - / - - / - - / - - / - 0 / 0.000 56 / 216.027 FY 2025 0 / 3.400 4 / 6.690 - / - 0 / 5.264 0 / 0.000 0 / 5.264 - / - - / - - / - - / - 0 / 2.000 4 / 17.354 FY 2026 - / - - / - - / - - - - - / - - / - - / - - / - - FY 2027 - / - 0 / 2.000 - / - 4 / 6.030 0 / 0.000 4 / 6.030 0 / 6.094 - / - - / - - / - 0 / 2.000 4 / 16.124 FY 2028 - / - - / - - / - 0 / 2.000 0 / 0.000 0 / 2.000 2 / 6.280 2 / 5.915 - / - - / - 0 / 2.000 4 / 16.195 FY 2029 - / - - / - - / - - / - - / - - / - 0 / 2.000 2 / 6.488 2 / 6.401 - / - 0 / 2.000 4 / 16.889 FY 2030 - / - - / - - / - - / - - / - - / - - / - 0 / 2.000 2 / 6.409 2 / 7.551 0 / 2.000 4 / 17.960 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 2.000 3 / 7.550 1 / 2.000 4 / 11.550 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - - - 6 / 15.404 - / - Total 54 / 212.713 / - - / - 4 / 13.294 / / - 0 / 0.000 / - 4 / 13.294 2 / 14.374 4 / 14.403 / - 4 / 14.810 / - 5 / 15.101 / - - / - - 1 / 12.000 / - / - 80 / 312.099 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 54 - 2 3 1 - - - - - 1 2 1 - - 1 1 2 - 1 1 2 - 1 1 - 1 2 2 1 80 Out 49 1 4 2 - - - - - 2 2 - - 2 2 - 1 1 - 3 2 6 80 1 - - - 1 1 - - Footnotes: (7) Installation funds are required in the year prior to install for Design Services Allocation - DSA - (hull planning yard ship checks, installation drawing development), Advanced Planning, and Integrated Logistics Support (ILS). FY 2026 PEO Aircraft Carriers' changes: The interruption in the contracting profile for material and installation under the Machinery Plant Upgrade (MPU) program reflects deferred work during the availabilities of CVN 72 and CVN 78, as well as planning activities for CVN 71 and CVN 77. LI 0981 - Items less than $5 Million Navy UNCLASSIFIED Page 8 of 14 P-1 Line #22 Volume 1 - 452 === page 531 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0981 / Items less than $5 Million ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 2 / LT314 - Carrier Oil Water Separator MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 38.672 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 38.672 Total - - - - - - - - - - - - 38.672 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 38.672 - - - - - - - - - - - - 38.672 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 38.672 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Enhanced Oil Water Separator (OWS) systems are being installed on the CVN68 Class carriers to meet the new environmental discharge law of 15 parts per million (ppm) worldwide. The new OWS systems include an oil content monitor and a bilge stripping structure. The new system is expected to reduce costly maintenance and reliability issues. LI 0981 - Items less than $5 Million Navy UNCLASSIFIED Page 9 of 14 P-1 Line #22 Volume 1 - 453 === page 532 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0981 / Items less than $5 Million Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / LT314 - Carrier Oil Water Separator MDAP/MAIS Code: Models of Systems Affected: Carrier Oil Water Separator Prior Years Modification Type: TBD FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: LT314 - Carrier Oil Water Separator B Kits Recurring 1.1.1) Oil Water Separator - NonOrganic (8) Subtotal: Recurring 13 / 7.560 - / - - / - - / - - / - - / - - / - - / - - / - - / - Subtotal: Procurement, All Modification Items / - 13 / 7.560 / 7.560 - / - - / - - / - - / - - / - - / - - / - - / - - / - 13 / 7.560 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 7.560 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 / 0.000 - / 0.000 - / 31.112 / - - / 0.000 - / 31.112 - Subtotal: LT314 - Carrier Oil Water Separator - - / 0.000 - - / - / 7.560 13 / 7.560 - / 7.560 Installation Modification Item 1 of 1: LT314 - Carrier Oil Water Separator - / 31.112 Subtotal: Installation - / 31.112 - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 0981 - Items less than $5 Million Navy 38.672 0.000 0.000 0.000 0.000 UNCLASSIFIED Page 10 of 14 0.000 0.000 0.000 P-1 Line #22 0.000 0.000 0.000 38.672 Volume 1 - 454 === page 533 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0981 / Items less than $5 Million Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / LT314 - Carrier Oil Water Separator MDAP/MAIS Code: Modification Item 1 of 1: LT314 - Carrier Oil Water Separator Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 2 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: AIT:: Installation Name: Oil Water Separator Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 13 / 31.112 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 13 / 31.112 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 13 / 31.112 13 / 31.112 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 13 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 13 Out 11 - - - - - - - - - - - - - - - - - - - - - - - - - - - - 13 2 Footnotes: (8) FY 2023 is the last year of procurements, and FY 2024 is the last year of installations for Oil-Water separator for CVN68 CL in-service Carriers. LI 0981 - Items less than $5 Million Navy UNCLASSIFIED Page 11 of 14 P-1 Line #22 Volume 1 - 455 === page 534 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0981 / Items less than $5 Million ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 3 / LT327 - Modular Refrigeration System. MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 19.767 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 19.767 Total - - - - - - - - - - - - 19.767 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 19.767 - - - - - - - - - - - - 19.767 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 19.767 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Modular Refrigeration System (MRS) replaces the existing legacy Ship's Stores Refrigeration System (SSRS) onboard CVN68 Class carriers. The legacy system is energy inefficient, space inefficient, and maintenance intensive, requiring highly skilled personnel to operate and maintain acceptable box temperatures. Most hardware associated with the legacy systems is specialized mil-spec and is either becoming unsupportable due to obsolescence or is grossly expensive to maintain. Each MRS is comprised of a Modular Refrigeration Unit (MRU), an operating/diagnostic control panel, and small chilled water cooled flatplate condenser. There are 18 MRUs required per hull. MRS's are self-contained hatchable MRUs with a dedicated control panel that eliminate 90% of current maintenance requirements and require minimal operator support/training. [Modular Reefer System] Modular Refrigeration System (MRS) replaces the existing legacy ship's stores refrigeration system (SSRS) onboard CVN68 class carriers. The legacy system is energy inefficient, space inefficient, and maintenance intensive, requiring highly skilled personnel to operate and maintain acceptable box temperatures. Most hardware associated with the legacy systems is specialized mil-spec and is either becoming unsupportable due to obsolescence, or is grossly expensive to maintain. Each Modular Refrigeration System (MRS) is comprised of a Modular Refrigeration Unit (MRU), an operating/ diagnostic control panel, and small chilled water cooled flat-plate condenser. There are 18 MRUs required per hull. Modular Refrigeration Systems (MRS's) are self-contained hatchable modular refrigeration units (MRU) with a dedicated control panel that eliminate 90% of current maintenance requirements and require minimal operator support/training. LI 0981 - Items less than $5 Million Navy UNCLASSIFIED Page 12 of 14 P-1 Line #22 Volume 1 - 456 === page 535 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0981 / Items less than $5 Million Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / LT327 - Modular Refrigeration System. MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: LT327 - Modular Refrigeration System. B Kits Recurring 1.1.1) Modular Reefer System - NonOrganic (9) Subtotal: Recurring Subtotal: LT327 - Modular Refrigeration System. Subtotal: Procurement, All Modification Items 69 / 10.300 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 10.300 - / - - / - - / - - / - - / - - / - - / - - / - - / - 69 / 10.300 - / - - / - - / - - / - - / - - / - - / - - / - - / - / 10.300 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 / 0.000 - / 0.000 - / 9.467 / - - / 0.000 - / 9.467 - - / 0.000 69 / 10.300 - / - / 10.300 - 69 / 10.300 / 10.300 - Installation Modification Item 1 of 1: LT327 - Modular Refrigeration System. - / 9.467 Subtotal: Installation - / 9.467 - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 / - - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - Total Total Cost (Procurement + Support + Installation) LI 0981 - Items less than $5 Million Navy 19.767 0.000 0.000 0.000 0.000 UNCLASSIFIED Page 13 of 14 0.000 0.000 0.000 P-1 Line #22 0.000 0.000 0.000 19.767 Volume 1 - 457 === page 536 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0981 / Items less than $5 Million Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / LT327 - Modular Refrigeration System. MDAP/MAIS Code: Modification Item 1 of 1: LT327 - Modular Refrigeration System. Manufacturer Information Manufacturer Name: DRS Marlo Coil Manufacturer Location: High Ridge, MO Administrative Leadtime (in Months): 2 Dates Production Leadtime (in Months): 10 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: AIT:: Installation Name: Modular Reefer System Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 69 / 9.467 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 69 / 9.467 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 69 / 9.467 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 69 / 9.467 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 69 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 69 Out 69 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 69 Footnotes: (9) FY 2023 is the last years of installs for CVN68 Class in-Service Carriers. LI 0981 - Items less than $5 Million Navy UNCLASSIFIED Page 14 of 14 P-1 Line #22 Volume 1 - 458 === page 537 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0989 / Chemical Warfare Detectors Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 14.400 3.254 2.607 2.425 0.000 2.425 2.575 2.622 2.717 2.767 47.585 80.952 Total - - - - - - - - - - - - 14.400 3.254 2.607 2.425 0.000 2.425 2.575 2.622 2.717 2.767 47.585 80.952 - - - - - - - - - - - - 14.400 3.254 2.607 2.425 0.000 2.425 2.575 2.622 2.717 2.767 47.585 80.952 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Joint Chemical and Biological Defense Program (CBDP) funds the development and procurement of Chemical and Biological Defense (CBD) Equipment to enhance the warfighter's ability to survive and complete their mission in a chemical biological contaminated environment. The Navy is responsible for the associated installation/integration and sustainment funds only. The Navy's requirement for Joint Biological Agent Identification and Diagnostic System (JBAIDS), Aerosol Vapor Chemical Agent Detector (AVCAD), and Enhanced Maritime Biological Detection (EMBD) system has been validated by the Chief of Naval Operations in associated Joint Operational Requirements Documents and Capability Production Documents. The inventory objective for EMBD upgrades was revised rom one-hundred ten (110) to onehundred fourteen (114) due to adding four LCS class ships because planned decommissioning has been delayed which allowed time to install the system upgrade. [P3A - 2 / AVCAD*]: The AVCAD (formerly NGCD), is a technology replacement for the Improved Point Detection System - Lifecycle Replacement (IPDS-LR) system. The inventory objective for shipboard installations is 169. [P3A - 3 / CW001 CHEMICAL WARFARE PROGRAM EMBD UPGRADE KIT]: CHEMICAL WARFARE PROGRAM EMBD UPGRADE KIT: The Enhanced Maritime Biological Detection (EMBD) kit is intended as a lifecycle replacement for the Joint Biological Point Detection System (JBPDS), and will include improved detection and identification capabilities. The equipment procurement is funded out of the Joint Service Chemical Biological Defense Program Budget. The inventory objective for shipboard installations is 114. LI 0989 - Chemical Warfare Detectors Navy UNCLASSIFIED Page 1 of 11 P-1 Line #23 Volume 1 - 459 === page 538 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 9: Other 0989 / Chemical Warfare Detectors Shipboard Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a 1 / CW001 CHEMICAL WARFARE PROGRAM JBAIDS (TBD) - / 5.486 - / 0.050 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-3a 2 / CW001 CHEMICAL WARFARE PROGRAM AVCAD (FORMERLY NGCD) (TBD) - / 0.000 - / 0.000 - / 0.297 - / 1.465 - / 0.000 - / 1.465 P-3a 3 / CW001 CHEMICAL WARFARE PROGRAM EMBD UPGRADE KIT (TBD) - / 8.914 - / 3.204 - / 2.310 - / 0.960 - / 0.000 - / 0.960 P-40 Total Gross/Weapon System Cost - / 14.400 - / 3.254 - / 2.607 - / 2.425 - / 0.000 - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code / 2.425 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a 1 / CW001 CHEMICAL WARFARE PROGRAM JBAIDS (TBD) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 5.536 P-3a 2 / CW001 CHEMICAL WARFARE PROGRAM AVCAD (FORMERLY NGCD) (TBD) - / 2.575 - / 2.622 - / 2.717 - / 2.767 - / 47.585 - / 60.028 P-3a 3 / CW001 CHEMICAL WARFARE PROGRAM EMBD UPGRADE KIT (TBD) - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 15.388 P-40 Total Gross/Weapon System Cost - / 2.575 - / 2.622 - / 2.717 - / 2.767 - / 47.585 - / 80.952 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 funding request is for installation of equipment including Fleet Modernization Program installations, installation of training equipment, installation of equipment in other shore facilities, and associated required new equipment training. Procurement of equipment is funded by the Joint Service CBDP. Costs can vary significantly, even within ship class, depending on installation location (East coast, West coast, overseas, etc.), if installation accomplished pier side or in a shipyard (i.e., availability type during which installation actually occurs), ship as built and as found conditions, and installation growth work (i.e., unplanned/unexpected work) driven by as found conditions. LI 0989 - Chemical Warfare Detectors Navy UNCLASSIFIED Page 2 of 11 P-1 Line #23 Volume 1 - 460 === page 539 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0989 / Chemical Warfare Detectors ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 1 / CW001 CHEMICAL WARFARE PROGRAM JBAIDS MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 5.486 0.050 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.536 Total - - - - - - - - - - - - 5.486 0.050 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.536 - - - - - - - - - - - - 5.486 0.050 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.536 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: OPNAVINST 3400.10J articulates U.S. Navy Chemical, Biological and Radiological Defense (CBRD) policy and establishes functional responsibilities to ensure the highest level of the Fleet readiness and warfighting sustainability in a CBR environment. JBAIDS systems will identify and quantify biological organisms of operational concern and other pathogens of clinical significance for confirmatory and prognostic purposes. The CENTCOM HR urgent need (dated Aug 2009) modifies the JBAIDS ORD (dated May 2003) with the addition of detection capability for the 2009/A/H1N1 influenza. The equipment procurement is funded out of the Joint Service CBDP Budget P-1 Item Nomenclature: JBAIDS. Beginning in FY13, system will install with refrigeration unit. LI 0989 - Chemical Warfare Detectors Navy UNCLASSIFIED Page 3 of 11 P-1 Line #23 Volume 1 - 461 === page 540 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0989 / Chemical Warfare Detectors Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 1 / CW001 CHEMICAL WARFARE PROGRAM JBAIDS FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: CW001 CHEMICAL WARFARE PROGRAM JBAIDS B Kits Non-Recurring 1.1.1) JBAIDS - NonOrganic 23 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 23 / 0.000 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - 23 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 23 / 0.000 - / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 Modification Item 1 of 1: CW001 CHEMICAL WARFARE PROGRAM JBAIDS - / 5.486 - / 0.050 Subtotal: Installation - / 5.486 - / 0.050 Subtotal: Non-Recurring Subtotal: CW001 CHEMICAL WARFARE PROGRAM JBAIDS Subtotal: Procurement, All Modification Items - / 0.000 Installation - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / 0.000 - / 5.536 / - - / 0.000 - / 5.536 Total Total Cost (Procurement + Support + Installation) LI 0989 - Chemical Warfare Detectors Navy 5.486 0.050 0.000 0.000 0.000 UNCLASSIFIED Page 4 of 11 0.000 0.000 0.000 P-1 Line #23 0.000 0.000 0.000 5.536 Volume 1 - 462 === page 541 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0989 / Chemical Warfare Detectors Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / CW001 CHEMICAL WARFARE PROGRAM JBAIDS MDAP/MAIS Code: Modification Item 1 of 1: CW001 CHEMICAL WARFARE PROGRAM JBAIDS Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 0 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: AIT:: Installation Name: JBAIDS Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 22 / 5.486 23 / 5.536 Prior Years 1 / 0.050 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.050 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 22 / 5.486 23 / 5.536 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 22 - - - 1 - - - - - - - - - - - - - - - - - - - - - - - - - 23 Out 22 - - - 1 - - - - - - - - - - - - - - - - - - - - - - - - - 23 LI 0989 - Chemical Warfare Detectors Navy UNCLASSIFIED Page 5 of 11 P-1 Line #23 Volume 1 - 463 === page 542 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0989 / Chemical Warfare Detectors ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 2 / CW001 CHEMICAL WARFARE PROGRAM AVCAD (FORMERLY NGCD) MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 0.000 0.000 0.297 1.465 0.000 1.465 2.575 2.622 2.717 2.767 47.585 60.028 Total - - - - - - - - - - - - 0.000 0.000 0.297 1.465 0.000 1.465 2.575 2.622 2.717 2.767 47.585 60.028 - - - - - - - - - - - - 0.000 0.000 0.297 1.465 0.000 1.465 2.575 2.622 2.717 2.767 47.585 60.028 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: OPNAVINST 3400.10J articulates U.S. Navy Chemical, Biological and Radiological Defense (CBRD) policy and establishes functional responsibilities to ensure the highest level of the Fleet readiness and warfighting sustainability in a CBR environment. The Aerosol Vapor Chemical Agent Detector (AVCAD), formerly Next Generation Chemical Detector (NGCD), provides shipboard point detection system for detecting and identifying nerve and blister agent contamination presence. The equipment procurement is funded out of the Joint Service Chemical Biological Defense Program Budget. LI 0989 - Chemical Warfare Detectors Navy UNCLASSIFIED Page 6 of 11 P-1 Line #23 Volume 1 - 464 === page 543 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0989 / Chemical Warfare Detectors Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan Modification Number / Title: 2 / CW001 CHEMICAL WARFARE PROGRAM AVCAD (FORMERLY NGCD) FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: CW001 CHEMICAL WARFARE PROGRAM AVCAD (FORMERLY NGCD) B Kits Recurring 1.1.1) AVCAD* - NonOrganic / - - / - - / - 4 / 0.000 - / - 4 / 0.000 / 0.000 - / - - / - - / - - / - - / - - / - - / - 4 / 0.000 - / - 4 / 0.000 - / 0.000 - / - - / - - / - - / - - Modification Item 1 of 1: CW001 CHEMICAL WARFARE PROGRAM AVCAD (FORMERLY NGCD) - / 0.000 Subtotal: Installation - / 0.000 Subtotal: Recurring - Subtotal: CW001 CHEMICAL WARFARE PROGRAM AVCAD (FORMERLY NGCD) Subtotal: Procurement, All Modification Items - 8 / 0.000 / - - 8 / 0.000 / - - 8 / 0.000 / - - 8 / 0.000 / - - 8 / 0.000 / - - 8 / 0.000 / - - 8 / 0.000 / - - 8 / 0.000 / - - 133 / 0.000 / - - 133 / 0.000 / - - 169 / 0.000 / - - / 0.000 169 / 0.000 / - - / 0.000 Installation - / 0.000 - / 0.297 - / 1.465 / - - / 0.297 - / 1.465 - / 0.000 - / 1.465 - / 2.575 - / 2.622 - / 2.717 - / 2.767 - / 47.585 - / 60.028 / - - / 1.465 - / 2.575 - / 2.622 - / 2.717 - / 2.767 - / 47.585 - / 60.028 - Total Total Cost (Procurement + Support + Installation) LI 0989 - Chemical Warfare Detectors Navy 0.000 0.000 0.297 1.465 0.000 UNCLASSIFIED Page 7 of 11 1.465 2.575 2.622 P-1 Line #23 2.717 2.767 47.585 60.028 Volume 1 - 465 === page 544 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0989 / Chemical Warfare Detectors Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / CW001 CHEMICAL WARFARE PROGRAM AVCAD (FORMERLY NGCD) MDAP/MAIS Code: Modification Item 1 of 1: CW001 CHEMICAL WARFARE PROGRAM AVCAD (FORMERLY NGCD) Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 0 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: [none specified]:: Installation Name: AVCAD* Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - 0 / 0.297 4 / 0.847 0 / 0.000 4 / 0.847 - / - - / - - / - - / - 0 / 0.000 4 / 1.144 FY 2028 - / - - / - - / - 0 / 0.618 0 / 0.000 0 / 0.618 8 / 1.848 - / - - / - - / - 0 / 0.000 8 / 2.466 FY 2029 - / - - / - - / - - / - - / - - / - 0 / 0.727 8 / 1.875 - / - - / - 0 / 0.000 8 / 2.602 FY 2030 - / - - / - - / - - / - - / - - / - - / - 0 / 0.747 8 / 1.909 - / - 0 / 0.000 8 / 2.656 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.808 8 / 1.942 0 / 0.000 8 / 2.750 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.825 133 / 47.585 133 / 48.410 Total - / - - / - 0 / 0.297 8 / 2.717 8 / 2.767 133 / 47.585 169 / 60.028 Installation Cost 4 / 1.465 0 / 0.000 4 / 1.465 8 / 2.575 8 / 2.622 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 133 169 Out - - - - - - - - - - - 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 133 169 LI 0989 - Chemical Warfare Detectors Navy UNCLASSIFIED Page 8 of 11 P-1 Line #23 Volume 1 - 466 === page 545 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 P-1 Line Item Number / Title: 0989 / Chemical Warfare Detectors ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: 3 / CW001 CHEMICAL WARFARE PROGRAM EMBD UPGRADE KIT MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 8.914 3.204 2.310 0.960 0.000 0.960 0.000 0.000 0.000 0.000 0.000 15.388 Total - - - - - - - - - - - - 8.914 3.204 2.310 0.960 0.000 0.960 0.000 0.000 0.000 0.000 0.000 15.388 - - - - - - - - - - - - 8.914 3.204 2.310 0.960 0.000 0.960 0.000 0.000 0.000 0.000 0.000 15.388 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: OPNAVINST 3400.10J articulates U.S. Navy Chemical, Biological and Radiological Defense (CBRD) policy and establishes functional responsibilities to ensure the highest level of the Fleet readiness and warfighting sustainability in a CBR environment. The Enhanced Maritime Biological Detection (EMBD) kit is intended as a lifecycle replacement for the Joint Biological Point Detection System (JBPDS) and includes improved detection and identification capabilities. The equipment procurement is funded out of the Joint Service Chemical Biological Defense Program Budget. The inventory objective for shipboard installations is one-hundred fourteen (114). [CW001 CHEMICAL WARFARE PROGRAM EMBD UPGRADE KIT] Remarks: A total of eighty (80) complete and two started of one-hundred fourteen (114) planned. EMBD is an acquisition program developed and procured thru JPEO-CBRND which will provide lifecycle replacement kits for existing JBPDS. The EMBD kit installs within the existing JBPDS frame as specific line replaceable units (LRUs) addressing certain parts obsolescence issues and provides hardware and software upgrades to the system. EMBD kit installation timeline takes approximately six days to account for LRU removal, perform LRU operability assessment for LRUs remaining in the system, and perform legacy LRU refurbishment in line with each EMBD kit installation to ensure proper operation upon completion of the upgrade. Without performing these additional steps, the EMBD kit upgrade will operate in a less-than-optimal state, resulting in a reduced automated biological point detection and identification state. LI 0989 - Chemical Warfare Detectors Navy UNCLASSIFIED Page 9 of 11 P-1 Line #23 Volume 1 - 467 === page 546 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0989 / Chemical Warfare Detectors Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / CW001 CHEMICAL WARFARE PROGRAM EMBD UPGRADE KIT MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Financial Plan Procurement Modification Item 1 of 1: CW001 CHEMICAL WARFARE PROGRAM EMBD UPGRADE KIT B Kits Recurring 1.1.1) CW001 CHEMICAL WARFARE PROGRAM EMBD UPGRADE KIT - NonOrganic (1) Subtotal: Recurring Subtotal: CW001 CHEMICAL WARFARE PROGRAM EMBD UPGRADE KIT Subtotal: Procurement, All Modification Items 63 / 0.000 - 25 / 0.000 / 0.000 63 / 0.000 - 18 / 0.000 / - 25 / 0.000 - / - - / - / - / - - / - - / - - / - - / - 114 / 0.000 - / - - / - - / - - / - - / - - / - - / - - - / - 8 / 0.000 - / - - / - - / - - / - - / - 114 / 0.000 / - - / - - / - - / - - / - - / - - / - - / - - / 0.000 Modification Item 1 of 1: CW001 CHEMICAL WARFARE PROGRAM EMBD UPGRADE KIT - / 8.914 - / 3.204 - / 2.310 - / 0.960 Subtotal: Installation - / 8.914 - / 3.204 - / 2.310 - / 0.960 - - / - - - 8 / 0.000 8 / 0.000 - 18 / 0.000 / - 8 / 0.000 - / 0.000 / 0.000 Installation - / 0.000 - / 0.960 / - - / 0.960 - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / - - / 0.000 - / 0.000 - / 15.388 / - - / 0.000 - / 15.388 Total Total Cost (Procurement + Support + Installation) LI 0989 - Chemical Warfare Detectors Navy 8.914 3.204 2.310 0.960 0.000 UNCLASSIFIED Page 10 of 11 0.960 0.000 0.000 P-1 Line #23 0.000 0.000 0.000 15.388 Volume 1 - 468 === page 547 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 0989 / Chemical Warfare Detectors Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 9 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 3 / CW001 CHEMICAL WARFARE PROGRAM EMBD UPGRADE KIT MDAP/MAIS Code: Modification Item 1 of 1: CW001 CHEMICAL WARFARE PROGRAM EMBD UPGRADE KIT Installation Information Method of Implementation: [none specified]:: Installation Name: CW001 CHEMICAL WARFARE PROGRAM EMBD UPGRADE KIT Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - Prior Years / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 63 / 8.914 FY 2025 63 / 8.914 - / - 25 / 2.750 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 25 / 2.750 FY 2026 - / - 0 / 0.454 18 / 2.070 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 18 / 2.524 FY 2027 - / - - / - 0 / 0.240 8 / 0.960 0 / 0.000 8 / 0.960 - / - - / - - / - - / - 0 / 0.000 8 / 1.200 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 8 / 0.960 - / - - / - - / - - / - 0 / 0.000 Total 63 / 8.914 25 / 3.204 18 / 2.310 8 / 0.960 0 / 0.000 114 / 15.388 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 63 6 6 5 8 4 4 5 5 2 2 2 2 - - - - - - - - - - - - - - - - - 114 Out 63 6 6 5 8 4 4 5 5 2 2 2 2 - - - - - - - - - - - - - - - - - 114 Footnotes: (1) FY 2027 funding supports installations on eight (8) ships at approximately $120K each, for a total of $960K. The procurement costs are specifically referring to Installation and Design Service Allocation (DSA) costs as there are no equipment procurement costs with any detector system installed. DSA costs are for government engineering oversight/support in preparation for ship installation and ship class planning yards for engineering services which include ship check, development and approval of ship installation drawings (SIDs), Ship Selected Record changes, Bill of Material (BOM), onsite planning yard engineering support during installation to answer liaison action record (LARs), and other engineering services depending on the planning yard. DSA costs are generally funded one year prior to planned installation due to drawing development lead time and installation preparation efforts. LI 0989 - Chemical Warfare Detectors Navy UNCLASSIFIED Page 11 of 11 P-1 Line #23 Volume 1 - 469 === page 548 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 470 === page 549 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 10: Reactor Plant Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1000 / Ship Maintenance, Repair and Modernization Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 6,311.583 2,573.098 6,311.583 2,573.098 6,311.583 2,573.098 2,392.620 2,392.620 2,392.620 2,737.140 - 0.000 2,737.140 - 2,737.140 - 0.000 2,737.140 - 2,737.140 0.000 2,494.645 - - 2,494.645 2,737.140 2,579.027 2,579.027 - - 2,494.645 2,579.027 2,077.858 2,077.858 2,077.858 To FY 2031 Complete 2,084.538 2,084.538 2,084.538 Total - 23,250.509 - 23,250.509 - 23,250.509 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Division A of the Consolidated Appropriations Act, 2020, Public Law 116-93 appropriated funding in Other Procurement, Navy (OPN) to initiate a program funding private contracted ship maintenance in the U.S. Pacific Fleet (CPF) in Fiscal Year (FY) 2020. Division C of the Consolidated Appropriations Act, 2021 continued this program in the U.S. Pacific Fleet, and Division C of the Consolidated Appropriations Act, 2022 expanded the program to include both U.S. Pacific Fleet and U.S. Fleet Forces (FFC). FY 2027 funds $2.7B for Continental United Status (CONUS) private contracted surface and submarine maintenance in both U.S. Pacific Fleet (CPF) and U.S. Fleet Forces Command (FFC). Funding private contracted ship maintenance planned for CPF and FFC with OPN allows the Navy to implement commercial best practices for ship maintenance and achieve Navy's A-120 contracting policy. It provides more flexibility to extend contract lead times, enables the Navy to address emergent repair requirements, and strengthens industry partnerships. The program continues to provide stability and financial efficiency to its industry partners, and continues the more stringent fiscal discipline demonstrated in the execution of the program. The Navy remains committed and motivated to utilizing this program to improve both the execution of depot-level maintenance and the overall readiness posture of the U.S. Navy's maritime forces. AVAILABILITIES DEFINITIONS: CIA (Carrier Incremental Availability): An availability for continuous accomplishment of depot maintenance and selected modernization on CVN 68 class aircraft carriers. DMP (Depot Modernization Period): An availability scheduled primarily for the installation of major high priority warfare improvement alterations. DPIA (Docking Planned Incremental Availability): A labor-intensive availability, of less than one year duration, for aircraft carriers in an Incremental Maintenance Plan. Maintenance and modernization are accomplished. Aircraft carriers assigned to Incremental Maintenance Plans are maintained through CIA's, PIAs and DPIAs in lieu of overhauls. DPMA (Docking Phased Maintenance Availability): A PMA expanded to include maintenance and modernization that require dry-docking. DSRA (Docking Selected Restricted Availabilities): An SRA expanded to include maintenance and modernization that require dry-docking. EDPMA (Extended Docking Phased Maintenance Availability): A DPMA expanded to include maintenance and modernization that cannot be accomplished in a DPMA. LI 1000 - Ship Maintenance, Repair and Modernizati... Navy UNCLASSIFIED Page 1 of 19 P-1 Line #24 Volume 1 - 471 === page 550 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 10: Reactor Plant Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1000 / Ship Maintenance, Repair and Modernization Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A EDSRA (Extended Docking Selected Restricted Availability): A DSRA expanded to include maintenance and modernization that cannot be accomplished in a DSRA. ERP (Extended Refit Period): Selected Restricted Availability with short docking inspection period. EOH (Engineered Overhaul): Overhaul availabilities of nuclear powered submarines during which the reactor is not refueled. ERO (Engineered Refueling Overhaul): Overhaul major maintenance availabilities of different nuclear powered submarine classes during which the reactor is also refueled. MMP (Major Maintenance Period): An onsite non-CNO availability for SSGNs for the accomplishment of maintenance and modernization. OH (Overhaul): A major availability normally exceeding 6-months duration for the accomplishment of maintenance and modernization. PIA (Planned Incremental Availability): A labor-intensive availability, of less than 6 months duration, for aircraft carriers in an Incremental Maintenance Plan. Maintenance and modernization are accomplished. Aircraft carriers assigned to Incremental Maintenance Plans are maintained through CIA's, PIAs and DPIAs in lieu of overhauls. PIRA (Pre-Inactivation Restricted Availability): A hull specific availability assigned to establish a final, abbreviated OPCYCLE prior to inactivation. PMA (Phased Maintenance Availability): A short labor-intensive availability for ships in a Phased Maintenance Program for the accomplishment of maintenance and modernization. Ships assigned to Phased Maintenance Programs are maintained through PMAs in lieu of overhauls. RA/TA (Restricted/Technical Availability): RA/TA is used to provide depot level support and maintenance (ie. Combat Systems, Habitability, Calibration, Ship Engineering material assessment, Nuclear Regional Maintenance Facilities). SCO (Service Craft Overhaul): A major industrial availability for the accomplishment of maintenance and modernization on service craft. SRA (Selected Restricted Availability): A short labor-intensive industrial period assigned to ships in Progressive or Engineered Operating Cycle Maintenance Programs for the accomplishment of maintenance and selected modernization. Ships assigned to Progressive Maintenance Programs are maintained through SRAs in lieu of overhauls. LI 1000 - Ship Maintenance, Repair and Modernizati... Navy UNCLASSIFIED Page 2 of 19 P-1 Line #24 Volume 1 - 472 === page 551 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 10: Reactor Plant Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1000 / Ship Maintenance, Repair and Modernization Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Ship Maintenance, Repair and Modernization - / 6,311.583 - / 2,573.098 - / 2,392.620 - / 2,737.140 - / 0.000 - / 2,737.140 P-40 Total Gross/Weapon System Cost - / 6,311.583 - / 2,573.098 - / 2,392.620 - / 2,737.140 - / 0.000 - / 2,737.140 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 requests $2.7 billion for U.S. Pacific Fleet and U.S. Fleet Forces to continue private contracted ship maintenance. Funding for ship maintenance Overhauls (OH) to Restricted/Technical Availabilities (RA/TA) performed at private shipyards. Ship overhauls restore the ship, including all operating systems that affect safety or combat capability, to established performance standards. LI 1000 - Ship Maintenance, Repair and Modernizati... Navy UNCLASSIFIED Page 3 of 19 P-1 Line #24 Volume 1 - 473 === page 552 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1000 / Ship Maintenance, Repair and Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Ship Maintenance, Repair and Modernization MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) - 6,311.583 Less PY Advance Procurement ($ in Millions) 2,573.098 - Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) 2,737.140 - 0.000 - 2,392.620 2,737.140 - 2,737.140 - 2,573.098 FY 2027 Total 0.000 - 2,392.620 - 6,311.583 - - 2,573.098 - Total Obligation Authority ($ in Millions) FY 2027 OOC - 2,392.620 - 6,311.583 FY 2027 Base - 2,737.140 - 2,737.140 - 0.000 2,737.140 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Flyaway - Ship Availability - U.S. Pacific Fleet Cost Recurring Cost 1.1.1) USS ABRAHAM LINCOLN (CVN-0072) - - 62.194 - - 1.1.2) USS AMERICA (LHA-0006) (ESDSRA1) - - - - - 1.1.3) USS ANCHORAGE (LPD-0023) (SRA2-1) - - - - 1.1.4) USS AUGUSTA (LCS-0034) (DSRA1) - - - 1.1.5) USS BARRY (DDG-0052) (SRA5-1) - - 1.1.6) USS BARRY (DDG-0052) (ISRA6-2) - - 1.1.7) USS BENFOLD (DDG-0065) (SRA5-2) - - 1.1.8) USS BOXER (LHD-0004) (DPMA3) - - 1.1.9) USS BOXER (LHD-0004) (SRA4-1) - - (PIA2) (1) - - - - - - - - - - - - - - 11.524 - - 6.381 - - - - - 6.381 - - - 4.128 - - 80.164 - - - - - 80.164 - 5.364 - - 71.529 - - 3.715 - - - - - 3.715 - - - - - - - - - - - - - - - - - - - - - 0.341 - - 17.419 - - - - - 17.419 - - - - - - 41.870 - - - - - - - - - - - - - - - - - - - - - - - - - - 2.552 - - - - - - - - - - - 103.165 266.952 176.269 - LI 1000 - Ship Maintenance, Repair and Modernizati... Navy - 233.223 152.758 UNCLASSIFIED Page 4 of 19 P-1 Line #24 Volume 1 - 474 === page 553 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1000 / Ship Maintenance, Repair and Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Ship Maintenance, Repair and Modernization MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1.1.10) USS CANBERRA (LCS-0030) (DSRA1) - - - - - 6.620 - - 5.530 - - 75.085 - - - - - 75.085 1.1.11) USS CARL M. LEVIN (DDG-0120) (ISRA1-1) - - - - - - - - 0.654 - - 13.449 - - - - - 13.449 1.1.12) USS CARL M. LEVIN (DDG-120) (ISRA1-2) - - - - - - - - - - - 0.668 - - - - - 0.668 1.1.13) USS CARL VINSON (CVN-70) (PIA3) - - 58.062 - - - - - - - - - - - - - - - 1.1.14) USS CHAFEE (DDG-0090) (SRA3-1) - - 86.291 - - - - - 0.334 - - 2.386 - - - - - 2.386 1.1.15) USS CHARLESTON (LCS-0018) (DSRA1) - - 5.894 - - - - - - - - - - - - - - - 1.1.16) USS CHUNGHOON (DDG-0093) (DMP2) - - 186.119 - - - - - 4.352 - - 10.948 - - - - - 10.948 1.1.17) USS CINCINNATI (LCS-0020) (DSRA1) - - 0.627 - - 0.979 - - 8.167 - - 76.009 - - - - - 76.009 1.1.18) USS COMSTOCK (LSD-0045) (SRA4-1) - - - - - 10.605 - - 9.276 - - 73.467 - - - - - 73.467 1.1.19) USS CURTIS WILBUR (DDG-0054) (ES-SRA4-1) - - 74.193 - - 5.975 - - 1.772 - - - - - - - - - 1.1.20) USS DANIEL INOUYE (DDG-0118) (ISRA1-1) - - - - - 28.844 - - - - - 0.477 - - - - - 0.477 1.1.21) USS DECATUR (DDG-0073) (SRA3-1) - - 42.466 - - - - - - - - - - - - - - - 1.1.22) USS DECATUR (DDG-0073) (DSRA5) - - - - - - - - 1.617 - - 82.681 - - - - - 82.681 1.1.23) USS ESSEX (LHD-0002) (ESSRA4-1) - - - - - - - - - - 1.471 - - - - - 1.471 162.067 LI 1000 - Ship Maintenance, Repair and Modernizati... Navy UNCLASSIFIED Page 5 of 19 P-1 Line #24 Volume 1 - 475 === page 554 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1000 / Ship Maintenance, Repair and Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Ship Maintenance, Repair and Modernization MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1.1.24) USS FITZGERALD (DDG-0062) (SRA4-1) - - 4.644 - - - - - - - - - - - - - - - 1.1.25) USS FITZGERALD (DDG-0062) (ISRA6-1) - - - - - 3.532 - - 27.797 - - 0.944 - - - - - 0.944 1.1.26) USS FRANK E. PETERSON JR. (DDG-0121) (ISRA1-1) - - - - - 2.886 - - - - - 0.172 - - - - - 0.172 1.1.27) USS FRANK E. PETERSON JR. (DDG-0121) (ISRA1-2) - - - - - - - - 0.178 - - 9.112 - - - - - 9.112 1.1.28) USS GABRIELLE GIFFORDS (LCS-0010) (DSRA2) - - 58.370 - - 73.869 - - 8.573 - - - - - - - - - 1.1.29) USS GERMANTOWN (LSD-0042) (SRA4-1) - - 5.684 - - - - - - - - - - - - - - - 1.1.30) USS GREEN BAY (LPD 20) (DSRA2) - - - - - - - 26.350 - - - - - - - - - 1.1.31) USS GRIDLEY (DDG-0101) (SRA2-2) - - 70.399 - - - - - - - - - - - - - - - 1.1.32) USS GRIDLEY (DDG-0101) (DMP) - - - - - 8.937 - - 10.813 - - - - - - - 1.1.33) USS HALSEY (DDG-0097) (DMP) - - - - - - - - - - - - - - - - - 1.1.34) USS HALSEY (DDG-0097) (DMP2) - - - - - - - - - - 3.211 - - - - - 3.211 1.1.35) USS HARPERS FERRY (LSD-0049) (DSRA3) - - - - - - - - - - - - - - - - - 1.1.36) USS HARPERS FERRY (LSD-0049) (SRA4-1) - - - - - 97.567 - - 25.000 - - - - - - - - - 1.1.37) USS HARPERS FERRY (LSD-0049) (SRA4-2) - - - - - - - - - - - 0.735 - - - - - 0.735 1.1.38) USS HOPPER (DDG-0070) (SRA3-1(d)) - - 74.708 - - - - - - - - - - - - - - - 119.970 104.485 LI 1000 - Ship Maintenance, Repair and Modernizati... Navy 190.277 UNCLASSIFIED Page 6 of 19 142.075 P-1 Line #24 142.075 Volume 1 - 476 === page 555 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1000 / Ship Maintenance, Repair and Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Ship Maintenance, Repair and Modernization MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1.1.39) USS HOPPER (DDG-0070) (ISRA6-1) - - - - - - - - 0.322 - - 16.467 - - - - - 16.467 1.1.40) USS JACK H. LUCAS (DDG-0125) (ISRA1-1) - - - - - - - - 0.089 - - 9.201 - - - - - 9.201 1.1.41) USS JACKSON (LCS-0006) (DSRA1) - - 30.113 - - - - - - - - - - - - - - - 1.1.42) USS JACKSON (LCS-0006) (DSRA2) - - - - - - - - 1.062 - - - - - - - 1.1.43) USS JOHN FINN (DDG-0113) (SRA1-1) - - 12.928 - - - - - - - - - - - - - - - 1.1.44) USS JEREMIAH DENTON (DDG-0129) (ISRA1-1) - - - - - - - - - - - 0.091 - - - - - 0.091 1.1.45) USS JOHN PAUL JONES (DDG-0053) (DSRA3) - - - - - - - - - - - - - - - - - 1.1.46) USS JOHN PAUL JONES (DDG-0053) (ISRA6-1) - - - - - - - - 2.942 - - 16.036 - - - - - 16.036 1.1.47) USS JOHN PAUL JONES (DDG-0053) (ISRA6-2) - - - - - - - - - - - 0.870 - - - - - 0.870 1.1.48) USS JOHN P. MURTHA (LPD-0026) (DSRA1) - - 27.237 - - - - - 21.970 - - 123.774 - - - - - 123.774 1.1.49) USS JOHN S. MCCAIN (DDG-0056) (DSRA4) - - 92.416 - - - - - 6.469 - - - - - - - - - 1.1.50) USS JOHN S. MCCAIN (DDG-0056) (ISRA6-1) - - - - - - - - - - - 0.870 - - - - - 0.870 1.1.51) USS KANSAS CITY (LCS-0022) (DSRA1) - - 0.076 - - 6.162 - - 70.259 - - 3.731 - - - - - 3.731 1.1.52) USS KIDD (DDG-0100) (ESDMP) - - 142.783 - - 46.212 - - 21.155 - - - - - - - - - 165.701 LI 1000 - Ship Maintenance, Repair and Modernizati... Navy UNCLASSIFIED Page 7 of 19 107.652 P-1 Line #24 107.652 Volume 1 - 477 === page 556 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1000 / Ship Maintenance, Repair and Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Ship Maintenance, Repair and Modernization MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1.1.53) USS LAKE ERIE (CG-0070) (SRA3-1) - - 27.273 - - - - - - - - - - - - - - - 1.1.54) USS LENAH H. SUTCLIFFE HIGBEE (DDG-0123) (ISRA1-1) - - - - - 1.100 - - 18.263 - - 0.164 - - - - - 0.164 1.1.55) USS LENAH H. SUTCLIFFE HIGBEE (DDG-0123) (ISRA1-2) - - - - - - - - 0.446 - - 8.654 - - - - - 8.654 1.1.56) USS MAKIN ISLAND (LHD-0008) (DSRA2) - - - - - 0.040 - - 4.209 - - 206.486 - - - - - 206.486 1.1.57) USS MANCHESTER (LCS-0014) (DSRA2) - - 52.455 - - - - - - - - - - - - - - - 1.1.58) USS MANCHESTER (LCS-0014) (SRA1) - - - - - 34.802 - - 0.722 - - - - - - - - - 1.1.59) USS MCCAMPBELL (DDG-0085) (DMP) - - - - - - - - - - - - - - - - - 1.1.60) USS MICHAEL MONSOOR (DDG-1001) (BYMP) - - - - - 6.039 - - 54.081 - - - - - - - - - 1.1.61) USS MICHAEL MURPHY (DDG-0112) (DSRA1) - - 70.092 - - - - - - - - - - - - - - - 1.1.62) USS MICHAEL MURPHY (DDG-0112) (ISRA3-1) - - - - - 1.600 - - 27.650 - - 0.920 - - - - - 0.920 1.1.63) USS MOBILE BAY (CG-0053) (SRA3-3) - - 37.082 - - - - - - - - - - - - - - - 1.1.64) USS MOBILE (LCS 0026) (ESDSRA1) - - 70.985 - - - - - 1.411 - - - - - - - - - 1.1.65) USS MOMSEN (DDG-0092) (DMP) - - 120.713 - - - - - - - - - - - - - - - 110.740 LI 1000 - Ship Maintenance, Repair and Modernizati... Navy UNCLASSIFIED Page 8 of 19 P-1 Line #24 Volume 1 - 478 === page 557 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1000 / Ship Maintenance, Repair and Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Ship Maintenance, Repair and Modernization MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) 1.1.66) USS MONTGOMERY (LCS-0008) (DSRA1) - - 53.500 - - - - - - - - 1.1.67) USS MONTGOMERY (LCS-0008) (DSRA2) - - - - - - - - 2.100 - - 1.1.68) USS MUSTIN (DDG-0089) (ESDMP) - - 80.056 - - - - - - - - 1.1.69) USS NEW ORLEANS (LPD-0018) (DSRA2) - - - - - - - - - - 1.1.70) USS NIMITZ (CVN-0068) (CIA) - - 66.677 - - - - - - 1.1.71) USS OAKLAND (LCS-0024) (DRSA1) - - 62.968 - - - - - 1.1.72) USS O'KANE (DDG-0077) (ESDSRA3) - - - - - 77.056 - 1.1.73) USS O'KANE (DDG-0077) (SRA3-1) - - 25.228 - - - 1.1.74) USS OMAHA (LCS-0012) (DSRA1) - - 52.696 - - 1.1.75) USS OMAHA (LCS-0012) (SRA) - - - - 1.1.76) USS PAUL HAMILTON (DDG-0060) (DSRA3) - - 28.987 1.1.77) USS PAUL HAMILTON (DDG-0060) (SRA-3-2) - - 1.1.78) USS PEARL HARBOR (LSD-0052) (ES-DSRA4) - 1.1.79) USS PINCKNEY (DDG-0091) (ESDMP) 1.1.80) USS PINCKNEY (DDG-0091) (DMP2) ($) Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - - - - - - - - - - - - - - - - - 9.017 - - - - - 9.017 - - - - - - - - - - - - - - - - - - - - 2.462 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 30.939 - - 1.235 - - - - - - - - - - - - - - 0.907 - - 91.925 - - - - - 91.925 36.853 - - - - - - - - - - - - - - - - - - - 18.841 - - - - - - - - - - - - - 75.388 - - - - - - - - - - - - - - - - - - - - 5.503 - - 59.027 - - 1.198 - - - - - 1.198 LI 1000 - Ship Maintenance, Repair and Modernizati... Navy 146.023 UNCLASSIFIED Page 9 of 19 - FY 2027 Total Total Cost 107.357 P-1 Line #24 - 107.357 Volume 1 - 479 === page 558 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1000 / Ship Maintenance, Repair and Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Ship Maintenance, Repair and Modernization MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1.1.81) USS PORTLAND (LPD-0027) (ESSRA1-2) - - 46.907 - - 3.984 - - 17.147 - - 63.977 - - - - - 63.977 1.1.82) USS PREBLE (DDG-0088) (DMP) - - 86.462 - - - - - - - - - - - - - - - 1.1.83) USS PRINCETON (CG-0059) (SRA3-2) - - 32.926 - - - - - - - - - - - - - - - 1.1.84) USS RUSSELL (DDG-0059) (DSRA3) - - - - - 88.246 - - 2.996 - - - - - - - - - 1.1.85) USS RUSSELL (DDG-0059) (SRA3-2) - - 47.468 - - - - - - - - - - - - - - - 1.1.86) USS RUSSELL (DDG-0059) (ISRA6-1) - - - - - - - - - - - 0.784 - - - - - 0.784 1.1.87) USS SAMPSON (DDG-102) (DMP) - - 49.091 - - 9.946 - - - - 2.817 - - - - - 2.817 1.1.88) USS SAN DIEGO (LPD-0022) (DSRA1) - - 120.214 - - 0.214 - - - - - - - - - - - - 1.1.89) USS SANTA BARBARA (LCS-0032) (DSRA1) - - - - - - - - 1.579 - - 79.204 - - - - - 79.204 1.1.90) USS SAVANNAH (LCS-0028) (DSRA1) - - - - - 65.638 - - 8.546 - - 2.447 - - - - - 2.447 1.1.91) USS SOMERSET (LPD-0025)(DSRA1) - - - - - 178.687 - - 20.208 - - - - - - - - - 1.1.92) USS SPRUANCE (DDG-0111) (ESSRA2-1) - - 60.751 - - - - - - - - - - - - - - - 1.1.93) USS SPRUANCE (DDG-0111) (ISRA3-2) - - - - - 2.510 - - 64.858 - - 3.369 - - - - - 3.369 1.1.94) USS STERETT (DDG-0104) (SRA2-2) - - 19.207 - - 33.143 - - 1.331 - - - - - - - - - LI 1000 - Ship Maintenance, Repair and Modernizati... Navy 165.529 UNCLASSIFIED Page 10 of 19 P-1 Line #24 Volume 1 - 480 === page 559 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1000 / Ship Maintenance, Repair and Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Ship Maintenance, Repair and Modernization MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1.1.95) USS STERETT (DDG-0104) (DMP) - - - - - - - - - - - 0.990 - - - - - 0.990 1.1.96) USS STETHEM (DDG-0063) (ISRA6-1) - - - - - - - - 1.543 - - 78.888 - - - - - 78.888 1.1.97) USS STOCKDALE (DDG-0106) (SRA2-2) - - 21.891 - - - - - - - - - - - - - - - 1.1.98) USS STOCKDALE (DDG-0106) (DSRA2) - - - - - 14.345 - - 88.537 - - 3.003 - - - - - 3.003 1.1.99) USS THEODORE ROOSEVELT (CVN-0071) (CIA) - - 18.043 - - - - - - - - - - - - - - - 1.1.100) USS THEODORE ROOSEVELT (CVN-0071) (DPIA3) - - 241.368 - - - - - - - - - - - - - - - 1.1.101) USS TRIPOLI (LHA-0007) (SRA1-1) - - 60.397 - - - - - - - - - - - - - - - 1.1.102) USS TULSA (LCS-0016) (DSRA1) - - 60.006 - - - - - - - - - - - - - - - 1.1.103) USS WAYNE E. MEYER (DDG-0108) (ISRA4-1) - - 100.508 - - - - - 2.441 - - - - - - - - - 1.1.104) USS WAYNE E. MEYER (DDG-0108) (SRA2-2) - - - - - - - - - - - 32.113 - - - - - 32.113 1.1.105) USS WILLIAM P. LAWRENCE (DDG-0110) (SRA2-1) - - 86.376 - - 6.064 - - 16.607 - - - - - - - - - 1.1.106) USS WILLIAM P. LAWRENCE (DDG-0110) (SRA2-2) - - - - - - - - - - - 0.301 - - - - - 0.301 1.1.107) USS ZUMWALT (DDG-1000) (DSRA1) - - 86.448 - - - - - - - - 7.323 - - - - - 7.323 LI 1000 - Ship Maintenance, Repair and Modernizati... Navy UNCLASSIFIED Page 11 of 19 P-1 Line #24 Volume 1 - 481 === page 560 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1000 / Ship Maintenance, Repair and Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Ship Maintenance, Repair and Modernization MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1.1.108) HABITABILITY (DDG-0051) - - 10.394 - - - - - 22.494 - - - - - - - - - 1.1.109) HABITABILITY (LSD-0041) - - 14.470 - - - - - 18.784 - - - - - - - - - - - 37.014 - - - - - - - - - - - - - - - 1.1.111) Requirements in Development (FY25FY31) - - - - - - - - 18.571 - - - - - - - - - Subtotal: Recurring Cost - - 4,305.447 - - 1,302.301 - - 1,306.538 - - 1,580.198 - - - - - 1,580.198 - - 4,305.447 - - 1,302.301 - - 1,306.538 - - 1,580.198 - - - - - 1,580.198 177.316 - - - - - - - - - - - - - - - 1.1.110) Level of Effort Requirements (2) Subtotal: Flyaway - Ship Availability - U.S. Pacific Fleet Cost Flyaway - Ship Availability - U.S. Fleet Forces Cost Recurring Cost 2.1.1) USS ARLINGTON (LPD-0024) (DSRA1) - - 2.1.2) USS ARLINGTON (LPD-0024) (SRA2-1) - - - - - - - - 1.792 - - 88.773 - - - - - 88.773 2.1.4) USS BAINBRIDGE (DDG-0096) (SRA3-1) - - - - - 4.029 - - 42.281 - - 2.111 - - - - - 2.111 2.1.7) USS BELOIT (LCS-0029) SRA1 - - - - - - - - - - - 0.365 - - - - - 0.365 2.1.9) USS BILLINGS (LCS-0015) DSRA1 - - - - - - - - 1.124 - - 69.545 - - - - - 69.545 2.1.12) USS BOISE (SSN-0764) EOH - - - - - - - - - - 100.300 - - - - - 100.300 2.1.15) USS CARNEY (DDG-0064) ISRA6-1 - - - - - - - - 0.320 - - 16.348 - - - - - 16.348 2.1.17) USS CARTER HALL (LSD-0050) SRA4-1 - - - - - - - - 1.575 - - 79.021 - - - - - 79.021 2.1.21) USS COLE (DDG-0067) DSRA3 - - 1.076 - - 2.191 - - 121.048 - - 5.667 - - - - - 5.667 LI 1000 - Ship Maintenance, Repair and Modernizati... Navy 330.000 UNCLASSIFIED Page 12 of 19 P-1 Line #24 Volume 1 - 482 === page 561 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1000 / Ship Maintenance, Repair and Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Ship Maintenance, Repair and Modernization MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 2.1.24) USS COOPERSTOWN (LCS-0023) SRA1 - - - - - - - - - - - 36.969 - - - - - 36.969 2.1.26) USS DELBERT D BLACK (DDG-0119) ISRA2 - - 17.250 - - - - - - - - - - - - - - - 2.1.27) USS DELBERT D BLACK (DDG-0119) DSRA1 - - - - - - - - 3.922 - - 52.738 - - - - - 52.738 2.1.28) USS DONALD COOK (DDG-0075) DSRA5 - - - - - 0.688 - - 78.680 - - 2.511 - - - - - 2.511 2.1.30) USS DYNAMIC (AFDL-0001) ROH - - 18.659 - - - - - - - - - - - - - - - 2.1.31) USS DYNAMIC (AFDL-0001) NWSCO - - 0.925 - - - - - - - - - - - - - - - 2.1.32) USS FARRAGUT (DDG-0099) DSRA2 - - - - - - - - 1.029 - - 7.352 - - - - - 7.352 2.1.34) USS FORREST SHERMAN (DDG-0098) SRA2-2 - - 25.471 - - - - - - - - - - - - - - - 2.1.35) USS FORREST SHERMAN (DDG-0098) DMP - - 0.997 - - 10.312 - - 112.127 - - 8.066 - - - - - 8.066 2.1.36) USS FORT LAUDERDALE (LPD-0028) SRA1-1 - - - - - 8.808 - - 49.336 - - 4.138 - - - - - 4.138 2.1.38) USS GEORGE H W BUSH (CVN-0077) FO-PIA2 - - 158.373 - - - - - - - - - - - - - - - 2.1.39) USS GEORGE WASHINGTON (CVN-0073) CIA-R - - 2.415 - - - - - - - - - - - - - - - 2.1.40) USS GEORGE WASHINGTON (CVN-0073) NW-CIAR - - 14.557 - - - - - - - - - - - - - - - LI 1000 - Ship Maintenance, Repair and Modernizati... Navy UNCLASSIFIED Page 13 of 19 P-1 Line #24 Volume 1 - 483 === page 562 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1000 / Ship Maintenance, Repair and Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Ship Maintenance, Repair and Modernization MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 2.1.41) USS GEORGE WASHINGTON (CVN-0077) FO-PIA3 - - 36.944 - - - - - - - - - - - - - - - 2.1.42) USS GERALD R FORD (CVN-0078) FO-CIA - - 15.170 - - - - - - - - - - - - - - - 2.1.43) USS GONZALEZ (DDG-0066) SRA3-2 - - 20.973 - - - - - - - - - - - - - - - 2.1.44) USS GONZALEZ (DDG-0066) DSRA5 - - - - - 0.243 - - 7.804 - - - - - - - 2.1.46) USS GRAVELY (DDG-0051) ISRA - - 6.586 - - - - - - - - - - - - - - - 2.1.47) USS GRAVELY (DDG-0051) NW-ISRA - - 0.897 - - - - - - - - - - - - - - - 2.1.48) USS GRAVELY (DDG-0107) ISRA2 - - 20.715 - - 35.540 - - - - - - - - - - - - 2.1.49) USS GRAVELY (DDG-0107) SRA2-2 - - 0.553 - - 4.007 - - - - - - - - - - - - 2.1.51) USS HARRY S TRUMAN (CVN-0075) FO-PIA3 - - 69.212 - - - - - - - - - - - - - - - 2.1.54) USS INDIANAPOLIS (LCS-0017) DSRA1 - - - - - - - - 5.833 - - 68.291 - - - - - 68.291 2.1.56) USS IWO JIMA (LHD-0007) SRA3-1 - - - - - 25.938 - - - - - 20.301 - - - - - 20.301 2.1.58) USS IWO JIMA (LHD-0007) FODPMA2 - - 203.649 - - - - - - - - - - - - - - - 2.1.59) USS IWO JIMA (LHD-0007) NWDPMA - - 22.280 - - - - - - - - - - - - - - - 2.1.60) USS JAMES E WILLIAMS (DDG-0095) DMP - - - - - 0.010 - - - - - - - - - - - - LI 1000 - Ship Maintenance, Repair and Modernizati... Navy UNCLASSIFIED Page 14 of 19 106.030 P-1 Line #24 106.030 Volume 1 - 484 === page 563 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1000 / Ship Maintenance, Repair and Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Ship Maintenance, Repair and Modernization MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 2.1.61) USS JAMES E WILLIAMS (DDG-0095) DMP1 - - 179.100 - - - - - - - - - - - - - - - 2.1.63) USS JASON DUNHAM (DDG-0109) SRA2-1 - - 14.213 - - - - - - - - - - - - - - - 2.1.64) USS JASON DUNHAM (DDG-0109) NW-SRA 2-1 - - 6.076 - - - - - - - - - - - - - - - 2.1.65) USS JASON DUNHAM (DDG-0109) ISRA2 - - - - - 4.943 - - - - - - - - - - - - 2.1.66) USS JASON DUNHAM (DDG-0109) ISRA3-2 - - - - - - - - 6.093 - - 15.031 - - - - - 15.031 2.1.69) USS KEARSARGE (LHD-0003) SRA4-1 - - - - - - - - 1.840 - - 13.148 - - - - - 13.148 2.1.70) USS LABOON (DDG-58) DSRA3 - - 18.237 - - - - 15.000 - - - - - - - - - 2.1.71) USS LABOON (DDG-58) ISRA6-1 - - - - - - - - - - - 0.381 - - - - - 0.381 2.1.73) USS LASSEN (DDG-0082) DMP - - 98.473 - - - - - - - - - - - - - - - 2.1.74) USS LASSEN (DDG-0082) ISRA5-1 - - - - - - - - 0.320 - - 16.348 - - - - - 16.348 2.1.76) USS MAHAN (DDG-0072) DSRA3 - - - - - 18.830 - - 107.108 - - 12.519 - - - - - 12.519 2.1.77) USS MAHAN (DDG-0072) ISRA6-1 - - - - - - - - - - - 0.191 - - - - - 0.191 2.1.78) USS MARINETTE (LCS-0001) SRA1 - - - - - - - - 2.176 - - 2.601 - - - - - 2.601 2.1.80) USS MASON (DDG-0087) ISRA1 - - 19.614 - - - - - - - - - - - - - - - 2.1.81) USS MASON (DDG-0087) ISRA5-2 - - - - - - - - 1.119 - - 15.050 - - - - - 15.050 2.1.84) USS MCFAUL (DDG-0074) ISRA2 - - - - - 14.105 - - - - - - - - - - - - 2.1.85) USS MCFAUL (DDG-0074) DSRA5 - - - - - - - - - - - - - - - - LI 1000 - Ship Maintenance, Repair and Modernizati... Navy 127.742 UNCLASSIFIED Page 15 of 19 145.530 P-1 Line #24 145.530 Volume 1 - 485 === page 564 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1000 / Ship Maintenance, Repair and Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Ship Maintenance, Repair and Modernization MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) 2.1.86) USS MESA VERDE (LPD-0019) SRA2-1 - - 2.1.87) USS MESA VERDE (LPD-0019) SRA2-2 - - 2.1.89) USS MINNEAPOLIS/ST PAUL (LCS-0001) SRA1 - 2.1.91) USS MITSCHER (DDG-0057) DSRA3 ($) 142.477 FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - - - - - - - - - - - - - - - - - - - - - - - 5.401 - - - - - 5.401 - - - - - - - 2.547 - - 12.949 - - - - - 12.949 - - 98.579 - - - - - - - - - - - - - - - 2.1.92) USS MITSCHER (DDG-0057) NWDSRA3 - - 10.895 - - - - - - - - - - - - - - - 2.1.93) USS MITSCHER (DDG-0057) ISRA1 - - - - - 3.852 - - 13.838 - - - - - - - - - 2.1.94) USS MITSCHER (DDG-0057) ISRA6-2 - - - - - - - - 0.373 - - 19.088 - - - - - 19.088 2.1.97) USS NEW YORK (LPD-0021) SRA2-1 - - 14.170 - - 96.741 - - 9.325 - - - - - - - - - 2.1.99) USS NITZE (DDG-0094) DMP - - 131.196 - - - - - - - - - - - - - - - 2.1.100) USS OAK HILL (LSD-0051) DSRA3 - - 22.798 - - - - 14.036 - - - - - - - - - 2.1.103) USS OREGON (SSN-0793) EDSRA1-AP - - - - - - - - - - - - - - - - 2.1.108) USS PORTER (DDG-0078) EDSRA - - 17.621 - - 86.935 - - 5.218 - - - - - - - - - 2.1.112) USS RAMAGE (DDG-0061) DSRA3 - - 152.436 - - 1.153 - - - - - - - - - - - - 2.1.113) USS RAMAGE (DDG-0061) SRA6-1 - - - - - - - 0.320 - - 16.348 - - - - - 16.348 - LI 1000 - Ship Maintenance, Repair and Modernizati... Navy 130.172 UNCLASSIFIED Page 16 of 19 117.139 P-1 Line #24 117.139 Volume 1 - 486 === page 565 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1000 / Ship Maintenance, Repair and Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Ship Maintenance, Repair and Modernization MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 2.1.115) USS RICHARD M MCCOOL JR (LPD-0029) SRA1-1 - - - - - - - - - - - 0.580 - - - - - 0.580 2.1.116) USS ROOSEVELT (DDG-0080) DSRA4 - - - - - - - - 1.085 - - 7.757 - - - - - 7.757 2.1.117) USS ROSS (DDG-0071) SRA5-1 - - - - - 0.001 - - 1.307 - - 17.581 - - - - - 17.581 2.1.118) USS ROSS (DDG-0071) ISRA5-2 - - - - - - - - - - - 0.195 - - - - - 0.195 2.1.119) USS SAN ANTONIO (LPD-0017) SRA2-1 - - 63.297 - - - - - - - - - - - - - - - 2.1.120) USS SAN ANTONIO (LPD-0017) NW-SRA-2-2 - - 14.668 - - - - - - - - - - - - - - - 2.1.121) USS SAN ANTONIO (LPD-0017) SRA2-2 - - - - - 33.576 - - 49.607 - - 12.326 - - - - - 12.326 2.1.123) USS ST. LOUIS (LCS-0019) DSRA1 - - - - - - - - 67.265 - - - - - - - - - 2.1.125) USS STOUT (DDG-0055) ISRA1 - - - - - 13.547 - - - - - - - - - - - - 2.1.126) USS STOUT (DDG-0055) ISRA6-2 - - - - - - - - 0.933 - - 18.127 - - - - - 18.127 2.1.128) USS TED STEVENS (DDG-0128) ISRA1-1 - - - - - - - - - - - 0.111 - - - - - 0.111 2.1.130) USS THE SULLIVANS (DDG-0068) DSRA3 - - 15.199 - - - - 12.087 - - - - - - - - - 2.1.131) USS THE SULLIVANS (DDG-0068) ISRA6-1 - - 6.417 - - - - - - - - 0.333 - - - - - 0.333 2.1.132) USS THE SULLIVANS (DDG-0068) ISRA6-2 - - 6.432 - - - - - - - - - - - - - - - 2.1.133) USS THOMAS HUDNER (DDG-0116) DSRA1 - - 0.470 - - 5.605 - - 96.808 - - 7.757 - - - - - 7.757 LI 1000 - Ship Maintenance, Repair and Modernizati... Navy 103.397 UNCLASSIFIED Page 17 of 19 P-1 Line #24 Volume 1 - 487 === page 566 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1000 / Ship Maintenance, Repair and Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Ship Maintenance, Repair and Modernization MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 2.1.134) USS THOMAS HUDNER (DDG-0116) ISRA2-1 - - 15.253 - - - - - - - - - - - - - - - 2.1.135) USS THOMAS HUDNER (DDG-0116) ISRA - - 0.268 - - - - - - - - - - - - - - - 2.1.136) USS THOMAS HUDNER (DDG-0116) ISRA2-2 - - 3.684 - - - - - - - - - - - - - - - 2.1.137) USS TRUXTUN (DDG-0103) ISRA - - 10.424 - - - - - - - - - - - - - - - 2.1.138) USS TRUXTUN (DDG-0103) DMP - - - - - 12.159 - - - - 13.114 - - - - - 13.114 2.1.139) USS TRUXUN (DDG-0103) ISRA2 - - 9.712 - - - - - - - - - - - - - - - 2.1.140) USS WASP (LHD-0001) SRA4-1 - - 25.590 - - 168.345 - - 8.898 - - - - - - - - - 2.1.141) USS WICHITA (LCS-0013) DSRA1 - - - - - 2.906 - - 60.305 - - 3.309 - - - - - 3.309 2.1.145) USS WINSTON S CHURCHILL (DDG-0081) ISRA5-1 - - - - - 2.167 - - 11.512 - - 0.569 - - - - - 0.569 2.1.146) USS WINSTON S CHURCHILL (DDG-0081) ISRA5-2 - - - - - - - - 0.799 - - - - - - - - - 2.1.147) USS WINSTON S CHURCHILL (DDG-0081) DSRA5 - - - - - - - - - - - 1.674 - - - - - 1.674 2.1.149) HABITABILITY (CVN-0075) - - 3.255 - - - - - - - - - - - - - - - 2.1.150) HABITABILITY (CVN-0069) - - 6.834 - - - - - - - - - - - - - - - LI 1000 - Ship Maintenance, Repair and Modernizati... Navy 135.506 UNCLASSIFIED Page 18 of 19 P-1 Line #24 Volume 1 - 488 === page 567 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1000 / Ship Maintenance, Repair and Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Ship Maintenance, Repair and Modernization MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 2.1.151) HABITABILITY (CVN-0077) - - 0.069 - - - - - - - - - - - - - - - 2.1.152) HABITABILITY (CVN-0078) - - 0.070 - - - - - - - - - - - - - - - 2.1.153) HABITABILITY (DDG-0051) - - 35.160 - - 12.839 - - 23.386 - - 13.259 - - - - - 13.259 2.1.154) HABITABILITY (LHD-0001) - - 31.836 - - 7.409 - - 6.770 - - - - - - - - - 2.1.155) HABITABILITY (LPD-0017) - - 17.595 - - 2.562 - - 3.630 - - - - - - - - - 2.1.156) HABITABILITY (LPD-0049) - - - - - 0.045 - - - - - - - - - - - - - - 2,006.136 - - 1,270.797 - - 1,086.082 - - 1,156.942 - - - - - 1,156.942 Subtotal: Flyaway - Ship Availability - U.S. Fleet Forces Cost Subtotal: Recurring Cost - - 2,006.136 - - 1,270.797 - - 1,086.082 - - 1,156.942 - - - - - 1,156.942 Gross/Weapon System Cost - - 6,311.583 - - 2,573.098 - - 2,392.620 - - 2,737.140 - - 0.000 - - 2,737.140 Footnotes: (1) (2) Ship Maintenance, Repair and Modernization contract strategy initiatives to properly fund availabilites are based on projected ship availability contract award dates. Funds represent growth work and level of effort requirements supporting private ship maintenance availabilities. LI 1000 - Ship Maintenance, Repair and Modernizati... Navy UNCLASSIFIED Page 19 of 19 P-1 Line #24 Volume 1 - 489 === page 568 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 490 === page 569 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 10: Reactor Plant Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1020 / Reactor Components Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 5,099.392 5,099.392 5,099.392 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 445.974 445.974 445.974 474.806 474.806 474.806 519.821 519.821 519.821 0.000 0.000 0.000 519.821 519.821 519.821 1,004.040 1,004.040 1,004.040 537.794 537.794 537.794 503.910 503.910 503.910 To FY 2031 Complete 475.920 Continuing 475.920 475.920 Total - Continuing Continuing Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This Program funds long lead time nuclear reactor propulsion plant components for planned and emergent installation and reactor plant spares for all operational submarines (SSBN, SSN, and SSGN), aircraft carriers (CVN), moored training ships (MTS). and fleet training equipment. The details of this program are classified CONFIDENTIAL and are submitted to Congress annually in the classified budget justification books. LI 1020 - Reactor Components Navy UNCLASSIFIED Page 1 of 3 P-1 Line #25 Volume 1 - 491 === page 570 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 1020 / Reactor Components Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 10: Reactor Plant Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Reactor Components - / 5,099.392 - / 445.974 - / 474.806 - / 519.821 P-40 Total Gross/Weapon System Cost - / 5,099.392 - / 445.974 - / 474.806 - / 519.821 - / - - / 519.821 / 0.000 - / 519.821 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: More specific details are classified CONFIDENTIAL and are submitted to Congress annually in the classified budget justification books. LI 1020 - Reactor Components Navy UNCLASSIFIED Page 2 of 3 P-1 Line #25 Volume 1 - 492 === page 571 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1020 / Reactor Components Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 10 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: Reactor Components FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) Reactor Components 1.1) Reactor Components A - - 5,099.392 - - 445.974 - - 474.806 - - 519.821 - - - - - 519.821 Subtotal: 1) Reactor Components - - 5,099.392 - - 445.974 - - 474.806 - - 519.821 - - - - - 519.821 Total - - 5,099.392 - - 445.974 - - 474.806 - - 519.821 - - - - - 519.821 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. LI 1020 - Reactor Components Navy UNCLASSIFIED Page 3 of 3 P-1 Line #25 Volume 1 - 493 === page 572 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 494 === page 573 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 11: Ocean Engineering ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1130 / Diving and Salvage Equipment Program Elements for Code B Items: N/A Other Related Program Elements: 0204561N, 0204454N, 0204423N, 0203424N, 0603713N Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - 87.633 14.000 7.842 33.013 0.000 33.013 30.664 19.796 13.944 14.219 - Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) - - - - - - - - - - - 87.633 14.000 7.842 33.013 0.000 33.013 30.664 19.796 13.944 14.219 - Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) To FY 2031 Complete - - - - - - - - - - - 87.633 14.000 7.842 33.013 0.000 33.013 30.664 19.796 13.944 14.219 - Total 221.111 221.111 221.111 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: DIVING AND SALVAGE EQUIPMENT: The equipment procured from this Diving and Salvage OPN line item provides critical diving and salvage equipment that enables planned/emergent waterborne submarine/ship repairs, salvage and battle damage repair operations, search and recovery to water depths up to 20,000 feet of seawater and Undersea Clandestine Insertion of Special Operations Forces (UCI-SOF) (service common equipment) to keep our Navy fleet operational and enable national priority missions. Program objectives are to: (1) provide increased safety for divers, (2) increase underwater ship maintenance capabilities, (3) provide reliable, rapid response salvage capability, and (4) reduce diving equipment maintenance costs by standardizing configuration of diving systems in the Fleet. FY-27 investment in Diving capability continues to emphasize phased replacement of aging life support equipment including surface-supplied diving helmet upgrades, HP composite flask replacements, SCUBA regulators and surface supplied augmented SCUBA sets, an HP Air Compressor, Air Rack Upgrades, Multi-occupant flexible recompression chamber and a Diver Launch and Recovery System. Navy dive computers, required by each diver to calculate decompression penalties, will also be procured. This equipment is essential to maintaining diving readiness throughout the Fleet. Additionally, we will make investments in new technology equipment that offer capability gains such as Diver Augmented Visual Display (DAVD) 3-D Sonar. These systems will produce a virtual environment in which a diver can operate and be directed by topside supervisors to execute salvage, search and recovery and other missions. Lastly, we continue to invest in upgrades to the Navy Experimental Diving Unit, which houses national assets such as the Ocean Simulation Facility (OSF). The OSF is a 40+ year old system that permits advanced research and testing of diving technology, diving procedures, human performance, decompression and physiology essential to advancing diving capabilities. FY-27 investment in Salvage includes a salvage firefighting kit, Deep Drone Upgrade, Lighting Kits, Kerrie Cable Underwater Cutting System, Salvage BDR Material Kit, Salvage Roller Bags, a Full Ocean Depth Remotely Operated Vehicle (ROV) and a Full Ocean Depth Line Spooler; all will be used for ship salvage. In Underwater Ship Husbandry (UWSH) we continue investments in cofferdam systems (4 standard and 1 complex), surface ship support systems, video/camera equipment, UWSH Storage and Shipping Containers, a pier-side support van, a propeller system repair kit, power tools, rigging systems, and a submarine support system. Underwater Ship Husbandry investments continue to produce significant returns on investment by eliminating the need for emergent dry dockings, thereby returning ships to service faster and less expensive than traditional shipyard availabilities. FY-27 investment in Naval Special Warfare Service-Common Equipment provides diving support equipment to include SCUBA diving systems, ROV systems, and MK25 replacements. LI 1130 - Diving and Salvage Equipment Navy UNCLASSIFIED Page 1 of 24 P-1 Line #26 Volume 1 - 495 === page 574 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 11: Ocean Engineering ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1130 / Diving and Salvage Equipment Program Elements for Code B Items: N/A Other Related Program Elements: 0204561N, 0204454N, 0204423N, 0203424N, 0603713N Line Item MDAP/MAIS Code: N/A [P40A / DIVING (N97)]: The DIVING EQUIPMENT to be procured in FY27 includes modernization of the Navy Experimental Diving Unit's Ocean Simulation Facility, surface supplied diving helmet upgrades, air storage flasks and racks, SCUBA equipment, an HP air compressor, dive computers (wrist mounted for calculating decompression requirements), recompression chamber systems, Diver Launch and Recovery System, and Diver Augmented Visual Display (DAVD) equipment. DAVD investment will provide Navy divers the ability to see and navigate in zero visibility water. More detailed descriptions are provided below: [P40A / HY176 - HP AIR COMPRESSORS]: This item replaces high pressure air compressors in existing divers' life support systems (DLSS) which have reached the end of their service life. Required I/O is 300. [P40A / HY177 - AIR PURIFICATION UNITS]: The Portable Air Purification Unit is used when charging diver's life support system (DLSS) breathing air flasks. The Portable Air Monitor Unit can monitor the diver's breathing air in accordance with the requirements of the U.S. Navy Dive Manual and can be inserted inline of the DLSS to monitor the purity of the diver's breathing air in accordance with the requirements of the U.S. Navy Dive Manual. . Required I/O is 50 units. [P40A / HY179 - NAVY EXPERIMENTAL DIVING UNIT]: NEDU's mission is to support the Fleet diver through test and evaluation of diving equipment and procedures as well as hyperbaric systems for NAVSEA, Navy, and DOW activities. Funding is to procure equipment for test, facilities atmospheric control, life support, and physiological systems. These systems not only ensure the safety and lives of NEDU sailors performing experimental dives but ultimately support the combat readiness and mission success of the Fleet sailors who use the equipment tested at NEDU. Funding is included to support the periodic upgrade of Ocean Simulation Facility (OSF) components. The OSF is the world's largest man-rated hyperbaric chamber affording space for 12 divers in 5 hyperbaric dry chambers, man-rated for dives to 2,250 feet of sea water (1000 psi) with a 50' x 15', 55,000-gallon wet-pot capacity, temperatures from 28 to 104 degrees Fahrenheit, an associated 1.3 million-cubic foot (37 km3) bottle field and uses a fully computerized data instrumentation and collection system. Unit prices vary depending on the specific equipment mix planned for upgrade in any single year. [P40A / HY199 - NAVY DIVE COMPUTER]: The Navy Dive Computer is a diver worn decompression computer which provides primarily Self-Contained Underwater Breathing Apparatus (SCUBA) divers with real time calculation of decompression limits/obligations. I/O is 1400. [P40A / HY210 - COMPACT DIVER LIFE SUPPORT SYSTEM AIR SUPPLY]: This is a portable Air Supply that has designated primary and secondary air cylinders with a simple, unregulated control panel. The air supply will provide 3000-5000 psi diver-breathing air to diving life support systems (DLSS)including but not limited to the Standard Navy Double-Lock Recompression Chamber (SNDL), Transportable Recompression Chamber System (TRCS), Flyaway Diving System (FADS) III, and Lightweight Diving Systems (LWDS). This is for use in surface supplied diving and hyperbaric treatment operations. Required Inventory Objective I/O is 25. [P40A / HY213 - HP COMPOSITE FLASK REPLACEMENT]: The flasks used in the Chamber Air and Oxygen System (CAOS), Air Supply Rack Assembly (ASRA), Oxygen Regulating Console Assembly (OSCA), Helium-Oxygen Supply Rack Assemblies (HOSRA), Compact Air Supply Assembly (CASRA), and Compact Oxygen Supply Rack Assembly (COSRA) all require replacement after 15 years. NAVSEA 00C will provide the cylinders to fleet diving commands. Required Inventory Objective I/O is 2500. [P40A / HY224 - SCUBA REGULATORS]: This is 1st and 2nd stage Self Contained Underwater Breathing Apparatus (SCUBA) regulator fitted with an additional octopus 2nd stage and a console with both a cylinder pressure gauge and diver's depth gauge included. I/O is 5,000. [P40A / HY233 - SURFACE SUPPLY AUGMENTED SCUBA SYSTEM]: The Surface Supply Augmented SCUBA System consists of the Interspiro DIVIATOR Dive Panel (DP) Surface Supply System and the Interspiro DIVIATOR Self Contained Underwater Breathing Apparatus (SCUBA) System. This is a lightweight, highly portable system which makes is ideal for rapid deployment to remote locations. The apparatus combines the capability of surface supplied diving with the portability of SCUBA. Required Inventory Objective I/O is 50. [P40A / HY249 - DIVER LAUNCH AND RECOVERY SYSTEM (LARS)]: A Frame launch and recovery system for divers that includes a diver's stage. I/O = 6 [P40A / HY271 - SURFACE SUPPLIED DIVING HELMET UPGRADE]: The Surface Supplied Diving Helmet Upgrade is a phase replacement for Kirby Morgan KM-37 Underwater Breathing Apparatus that have reached the end of their service life. This is a rugged diving helmet with a second stage regulator that works in conjunction with a surface supply control console assembly (CCA) and an umbilical. Required I/O is 400 LI 1130 - Diving and Salvage Equipment Navy UNCLASSIFIED Page 2 of 24 P-1 Line #26 Volume 1 - 496 === page 575 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 11: Ocean Engineering ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1130 / Diving and Salvage Equipment Program Elements for Code B Items: N/A Other Related Program Elements: 0204561N, 0204454N, 0204423N, 0203424N, 0603713N Line Item MDAP/MAIS Code: N/A [P40A / HY272 - MULTI-OCCUPANT FLEXIBLE RECOMPRESSION CHAMBER SYSTEM]: The Multi-Occupancy Flexible Recompression Chamber System is a collapsible, extreme lightweight double-lock chamber for expeditionary operations. It includes a recompression chamber for up to three occupants, control console, interconnecting hoses, and high pressure gas supplies for air and oxygen. It is used to treat diving related injuries, including Arterial Gas Embolism and Decompression Sickness in accordance with the U.S. Navy Dive Manual. I/O is 36. [P40A / HY273 - CHAMBER VAN UPGRADE]: The Chamber Van Upgrade is a phase replacement for ISO Containers that house portable recompression chambers, which have reached the end of their service life due to deterioration from salt-water exposure. In order to ensure the correct level of environmental protection during all missions for the hyperbaric chamber and their occupants, the upgraded Vans with improved protective coatings has become a necessity and requirement. I/O is 30 [P40A / HY274 - DIVER AUGMENTED VISUAL DISPLAY (DAVD) GEN 3]: The GEN 3 DAVD system will be an upgraded version of the GEN 2 DAVD, it will allow for greater accuracy of diver tracking and head positioning and will augment the divers underwater vision with AR/VR capability using helmet mounted high resolution cameras. I/O = 20 [P40A / HY289 - TRANSPORTABLE RECOMPRESSION CHAMBER SYSTEM CHAMBER UPGRADE KIT]: Transportable Recompression Chamber System Upgrade Kits for 5000psi service to increase the TRCS operational capability, reduce footprint and provide interface with other U.S. Navy Certified Dive Systems rated to 5000psi. [P40A / HY290 - DIVER AUGMENTED VISUAL DISPLAY (DAVD) 3D SONAR WITH GPC UPGRADE]: The Diver Augmented Visual Display (DAVD) 3D sonar imaging system with global positioning system (GPS) upgrade. This sonar produces real time high-resolution 3D imagery that can be used to create a 3D model of a large undersea area and real time sonar imagery that can be used for diver navigation. [P40A / HY317 - AIR RACK UPGRADE]: This is a portable commercial gas rack that supplies 5000psi diver-breathing gases to diving life support systems (DLSS) including recompression chamber. I/O is 70 [P40A / NAVAL SPECIAL WARFARE (NSW) SERVICE-COMMON EQUIPMENT (N95)]: The NSW SERVICE COMMON EQUIPMENT to be procured in FY27 in the amount of $8.147M includes SCUBA diving systems, haskel pumps, navy dive computers, MK25 replacements and ROV systems. More detailed descriptions are provided below: [P40A / HY291 - (NSW) HP COMPRESSOR]: This item replaces high pressure air compressors in existing divers' life support systems which have reached the end of their service life. [P40A / HY293 - (NSW) HASKEL PUMPS]: This item replaces oxygen booster pumps in existing divers' life support systems which have reached the end of their service life. [P40A / HY294 - (NSW) NAVY DIVE COMPUTER]: The NSW Navy Dive Computer (NDC) is a decompression computer that monitors a divers depth and dive time to determine a decompression profile in accordance with US Navy decompression algorithms. These are to be used by Naval Special Warfare (NSW) divers and shall only be the make and model listed on the US Navy Authorized for Navy Use (ANU) list. [P40A / HY296 - (NSW) DIVER LIFE SUPPORT SYSTEM (DLSS) CHARGING VAN]: Modified ISO 8 ft x 8 ft x 10 ft ISO containers equipped to store and ship portable compressors and ancillary equipment in support of NSW combat diving operations. Each van is complete with a humidity controlling device for prolonging equipment life during storage. The system includes all necessary rigging and handling equipment. [P40A / HY297 - (NSW) STANDARD DOUBLE LOCK RECOMPRESSION CHAMBER VAN UPGRADE]: These MILVANS are modified ISO 8 ft x 8 ft x 20 ft ISO containers equipped to store and ship portable recompression chambers and ancillary equipment in support of Naval Special Warfare (NSW) combat diving operations. Each van is complete with a humidity controlling device for prolonging equipment life during storage. [P40A / HY307 - (NSW) DIVING SUPPORT EQUIPMENT SCUBA DIVING SYSTEMS]: This supports the SCUBA systems Table of Allowance (TOA) requirements for life-cycle replacement and/or upgrades to existing systems within the SCUBA TOA assembly. LI 1130 - Diving and Salvage Equipment Navy UNCLASSIFIED Page 3 of 24 P-1 Line #26 Volume 1 - 497 === page 576 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 11: Ocean Engineering ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1130 / Diving and Salvage Equipment Program Elements for Code B Items: N/A Other Related Program Elements: 0204561N, 0204454N, 0204423N, 0203424N, 0603713N Line Item MDAP/MAIS Code: N/A [P40A / HY308 - (NSW) DIVING SUPPORT EQUIPMENT ROV SYSTEM]: This supports the Table of Allowance (TOA) and other non-TOA diving requirements for the remotely operated vehicle (ROV) system to include ROV systems, tools, initial spares and testing as required to support fielding. This line also supports life-cycle upgrade of existing and procurement of new systems as required. [P40A / HY309 - (NSW) MK25 REPLACEMENT]: This supports the Table of Allowance (TOA) for the MK25 Closed Circuit Rebreather life-cycle replacement to include MK25 systems, tools, initial spares and testing as required to support fielding. [P40A / MOBILE DIVING SALVAGE UNIT (MDSU) OUTFITTING EQUIPMENT (N95)]: The MDSU EQUIPMENT to be procured in FY27 in the amount of $0.343M provides prioritized outfitting for Mobile Diving Salvage Unit (MDSU), Explosive Ordinance Disposal (EOD) Commands and Underwater Construction Team (UCT) Table of Allowance (TOA) requirements of centrally managed diving systems and equipment. This equipment includes diving, salvage and combat support equipment to meet Required Operational Capabilities / Projected Operational Environment (ROC/POE) and Navy Mission Essential Tasks (NMET) to include underwater visual augmentation systems and dive computers. More detailed descriptions are provided below: [P40A / HY262 - (MDSU) DIVER AUGMENTED VISUAL DISPLAY (DAVD) GEN 3 UPGRADE KIT]: This kit will modify a DAVD - GEN 2 system to improve it to a GEN 3 system for Navy Expeditionary Combat Command divers. [P40A / HY263 - (MDSU) SELF CONTAINED UNDERWATER BREATHING APPARATUS REGULATORS]: These a self contained underwater breathing apparatus (SCUBA) regulators that are used to reduce air pressure in a SCUBA cylinder and deliver that air at a useable pressure to a Navy Expeditionary Combat Command (NECC) diver. The make and model of the SCUBA regulator shall be approved on the US Navy Authorized for Navy Use (ANU) list. [P40A / HY264 - (MDSU) NAVY DIVE COMPUTER]: This is a diver decompression computer that monitors a diver's depth and dive time to determine a decompression profile in accordance with US Navy decompression algorithms. These are to be used by Navy Expeditionary Combat Command (NECC) divers and shall only be the make and model listed on the US Navy Authorized for Navy Use (ANU) list. [P40A / HY277 - (MDSU) DIVER AUGMENTED VISUAL DISPLAY (DAVD) GEN 3]: The Gen-3 DAVD system will be an upgraded version of the GEN-2 DAVD, it will allow for greater accuracy of diver tracking and head positioning and will augment the divers underwater vision with AR/VR capability using helmet mounted high resolution cameras. I/O = 20 [P40A / HY298 - (MDSU) DAVD 3D SONAR WITH GPS UPGRADE]: The 3D sonar imaging system with global positioning system (GPS) upgrade. Sonar produces real time high-resolution 3D imagery that can be used to create a 3D model of a large undersea area. The system is also capable of producing real time sonar imagery that can be over-laid onto a previously produced 3D model and used for diver locating and navigation controlled by a topside control system. These are to be used by Navy Expeditionary Combat Command (NECC) divers. [P40A / HY306 - (MDSU) NAVY DIVE COMPUTER LO MU]: This is a diver decompression computer that monitors a divers depth and dive time to determine a decompression profile in accordance with US Navy decompression algorithms and have a low magnetic signature. These are to be used by Navy Expeditionary Combat Command (NECC) divers and shall only be the make and model listed on the US Navy Authorized for Navy Use (ANU) list. [P40A / EXPLOSIVE ORDNANCE DISPOSAL (EOD) DIVING & SALVAGE EQUIPMENT (N95)]: The EOD EQUIPMENT to be procured in FY27 in the amount of $1.968M provides prioritized outfitting for Explosive Ordinance Disposal (EOD) Commands. The outfitting provides diving, salvage and combat support equipment to meet Navy Mission Essential Tasks (NMET) to include a standard navy double-lock recompression chamber, SCUBA equipment, dive computers, diver augmented visual display 3D sonar, and a diver launch and recovery system. [P40A / HY279 - (EOD) DIVER TELEMTRY SYSTEM]: Diver HUD System (EOD) - The system provides the diver with a heads up display (HUD) which incorporates various data for the diver to include inputs such as status, telemetry, terrain mapping, navigation and tracking. The system is provided for use in existing EOD underwater breathing apparatus (UBA) or face masks. I/O = 200. LI 1130 - Diving and Salvage Equipment Navy UNCLASSIFIED Page 4 of 24 P-1 Line #26 Volume 1 - 498 === page 577 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 11: Ocean Engineering ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1130 / Diving and Salvage Equipment Program Elements for Code B Items: N/A Other Related Program Elements: 0204561N, 0204454N, 0204423N, 0203424N, 0603713N Line Item MDAP/MAIS Code: N/A [P40A / HY300 - (EOD) TRANSPORTABLE RECOMPRESSION CHAMBER SYSTEM (TRCS)]: The Transportable Recompression Chamber System (TRCS) provides an effective two-man evacuation, transport, treatment, and transfer under pressure capability in order to benefit a diver suffering a pressure related ailment requiring urgent hyperbaric treatment. This is the lightest, most transportable hyperbaric system available to the U. S. Navy. These are to be used by Navy Expeditionary Combat Command (NECC) divers. I/O = 7 [P40A / HY301 - (EOD) STANDARD NAVY DOUBLE-LOCK RECOMPRESSION CHAMBER (SNDL)]: The Standard Navy Double Lock Recompression Chamber System (SNDLRCS) is a conventional chamber designed and built using standard commercial specifications and standards. The SNDLRCS provides for surface decompression, training, and for the full range of recompression treatment for two patients and two attendants. These chambers are containerized to allow for transport and installation at a destination for long term operations. The SNDLRCS will replace aging legacy recompression chambers that are difficult to maintain and will be retired due to fatigue and material flaws. These are to be used by Navy Expeditionary Combat Command (NECC) divers. I/O = 3 [P40A / HY310 - (EOD) NAVY DIVE COMPUTER LO MU]: This is a diver decompression computer that monitors a divers depth and dive time to determine a decompression profile in accordance with US Navy decompression algorithms and have a low magnetic signature. These are to be used by Navy Expeditionary Combat Command (NECC) divers and shall only be the make and model listed on the US Navy Authorized for Navy Use (ANU) list. [P40A / HY311 - (EOD) DAVD 3D SONAR WITH GPC UPGRADE]: The 3D sonar imaging system with global positioning system (GPS) upgrade. Sonar produces real time high-resolution 3D imagery that can be used to create a 3D model of a large undersea area. The system is also capable of producing real time sonar imagery that can be over-laid onto a previously produced 3D model and used for diver locating and navigation controlled by a topside control system. [P40A / HY312 - (EOD) NAVY DIVE COMPUTER]: This is a diver decompression computer that monitors a diver's depth and dive time to determine a decompression profile in accordance with US Navy decompression algorithms. These are to be used by Navy Expeditionary Combat Command (NECC) divers and shall only be the make and model listed on the US Navy Authorized for Navy Use (ANU) list. [P40A / HY313 - (EOD) DIVER LAUNCH AND RECOVERY SYSTEM (LARS)]: Frame launch and recovery system for divers that includes a diver's stage. [P40A / SALVAGE (N97)]: The SALVAGE EQUIPMENT to be procured in FY27 in the amount of $21.290M includes deep ocean salvage systems and upgrades (ROVs, line spoolers), lighting kits, cutting systems, BDR materials, roller bags and fire-fighting equipment. Also included are underwater ship husbandry equipment (cofferdam systems, a submarine support system, surface ship support systems, propeller repair kit, power tools and rigging equipment, video/camera equipment, pierside support vans, and shipping containers) to permit divers to make underwater repairs to ships and submarines afloat. More detailed descriptions are provided below: [P40A / HY116 - PORTABLE SUBMERSIBLE PUMPS]: The submersible salvage pump system is designed move large volumes of fluid at a high discharge pressure resulting is a high lift capacity. The submersible pumps vary in discharge size of 2" to over 24" to meet designated response requirements. Systems are modular packaged for rapid deployment and transportation. Pump assemblies are designed to be used through limited access openings or to be positioned in confined spaces. Submersible salvage pump systems consist of submersible hydraulic pumps (2" to 24"), hydraulic power units, hydraulic hoses, and all ancillary equipment. Required I/O is 94. [P40A / HY131 - REMOTE OPERATED VEHICLES (ROV) HANDLING SYSTEM]: These systems are used to launch and recover remotely operated vehicles and to tend the deployed cable, compensate for ship motion, monitor cable tension, and store cable. Required I/O is 10 (5 operational and 5 spares). [P40A / HY142 SALVAGE AIR COMPRESSOR]: Salvage Air Compressors are utilized to provide large quantities of compressed air for restoration of lost buoyancy. I/O is 6. [P40A / HY145 - COFFERDAM SYSTEM]: This system will contain a variety of cofferdams necessary to accomplish underwater repair tasks to hull plating, shafts, stern tubes and sea chests on several ship classes. The cofferdams are engineered structural habitats which provide a safe underwater dry environment for divers to work and require very little maintenance. Required I/O is 50. LI 1130 - Diving and Salvage Equipment Navy UNCLASSIFIED Page 5 of 24 P-1 Line #26 Volume 1 - 499 === page 578 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 11: Ocean Engineering ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1130 / Diving and Salvage Equipment Program Elements for Code B Items: N/A Other Related Program Elements: 0204561N, 0204454N, 0204423N, 0203424N, 0603713N Line Item MDAP/MAIS Code: N/A [P40A / HY146 - PROPELLER SYSTEM REPAIR KIT]: These kits will contain the tools necessary to repair minor propeller damage underwater. By accomplishing these repairs in-place, propeller removal and replacement can be avoided thereby saving maintenance funds and returning ships to service faster. Required I/O is 20. [P40A / HY155 POWER GENERATORS]: They are used aboard a ship and shore-side to provide general purpose electrical power during salvage and de-beaching operations. There are two different sizes of power generators, 5 KW and 30 KW. The generators are a system consisting of a diesel powered, portable generating unit, a power distribution panel, and associated distribution apparatus. Required I/O is 25 (7 KW) and 22 (30 KW) for a total of 47. [P40A / HY169 - UNDERWATER SHIP HUSBANDRY (UWSH) POWER TOOLS]: These kits will contain the tools necessary to repair minor propeller damage underwater. By accomplishing these repairs inplace, propeller removal and replacement can be avoided thereby saving maintenance funds and returning ships to service faster. Required I/O is 20. [P40A / HY186 - SMART TOW SYSTEMS]: These systems consist of load cells, accelerometers, fire and flooding alarms, telemetry links and ancillary equipment to provide ship handlers with information critical to safe conduct of open ocean tows. I/O is 9. [P40A / HY190 - VIDEO/CAMERA EQUIPMENT]: Underwater video/camera equipment used by divers to perform detailed inspections and provide objective quality evidence (OQE) of ship hulls and appendages condition before, during and after repair. Equipment is used extensively throughout the Fleet. This equipment will replace aging systems currently in use throughout the Fleet. I/O is 30. [P40A / HY195 - UNDERWATER RIGGING SUPPORT SYSTEM]: General and special purpose rigging equipment designed for use in underwater ship repair applications. These systems support operation across all ships and submarine classes. I/O is 20. [P40A / HY196 - UNDERWATER SHIP HUSBANDRY (UWSH) SUBMARINE SUPPORT SYSTEM]: Special purpose underwater tools and equipment used by divers to perform routine and emergent repairs to all classes of submarines. I/O is 24. [P40A / HY197 - UNDERWATER SHIP HUSBANDRY (UWSH) PIERSIDE SUPPORT VANS]: Portable milvans and shippable containers outfitted with general and special purpose tools to support various underwater ship husbandry operations. I/O is 12. [P40A / HY198 - UNDERWATER SHIP HUSBANDRY (UWSH) SURFACE SHIP SUPPORT SYSTEMS]: Special purpose underwater tools used by divers to perform routine and emergent repairs to all Classes of surface ships. I/O is 32 [P40A / HY200 - DEEP DRONE UPGRADE]: Modernization of the Remote Operated Vehicle (ROV) DEEP DRONE to include power, telemetry, avionics, thrusters, camera systems, and tools. [P40A / HY203 - HYDRAULIC U/W TOOL KIT]: Tool kit consists of various hydraulic actuated tools operated by a diver to perform various tasks underwater. The kit also contains hydraulic hoses, various fittings, and accessories. Required Inventory Objective I/O is 30. [P40A / HY204 - 400 AMP WELDER-DIESEL]: System consists of a skid-mounted, portable, diesel powered welding generator, welding cables, a stinger and ground clamp, welding safety equipment, and a spare parts kit. The system is used for arc welding and oxygen-arc cutting. Required Inventory Objective I/O is 27. [P40A / HY205 - LIGHTING KIT SYSTEM]: System consists of extended able masts, 500-watt halogen floodlights, drop lights, extension cords, spare bulbs, and other miscellaneous items to support general lighting for salvage and oil pollution operations. The Lighting Kit System can use any 100-volt, single phase power source found at the salvage or pollution site. Required Inventory Objective I/O is 27. [P40A / HY206 - KERRIE CABLE UNDERWATER CUTTING SYSTEM]: System is used for underwater cutting. The kit contains a flexible thermic lance, oxygen hoses, an oxygen regulator, various fittings, and a 400-amp safety switch enclosed in a watertight box. Required Inventory Objective I/O is 24. LI 1130 - Diving and Salvage Equipment Navy UNCLASSIFIED Page 6 of 24 P-1 Line #26 Volume 1 - 500 === page 579 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 11: Ocean Engineering ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1130 / Diving and Salvage Equipment Program Elements for Code B Items: N/A Other Related Program Elements: 0204561N, 0204454N, 0204423N, 0203424N, 0603713N Line Item MDAP/MAIS Code: N/A [P40A / HY215 - LIGHTWEIGHT MOORING SYSTEM]: This is a lightweight and highly portable system for establishing a mooring in shallow to deep water. The system shall include a mooring leg consisting of anchors, chain, synthetic line and associated jewelry and fittings. Total I/O is 8. [P40A / HY216 SAL/BDR MATERIAL KIT]: This system is for emergency response to ship casualties and provides the necessary material to construct custom patches and cofferdams. The kit also includes custom built items in place over the damaged hull sections. I/O is 6. [P40A / HY217 - SALVAGE LIFT BAGS (22K LBS)]: This system provides a buoyant force using compressed air to lift or support items in the water column. These Lift Bags are sized to provide a force of approximately 22,000 lbs. The I/O is 22. [P40A / HY218 - SALVAGE LIFT BAGS (35 TONS)]: This system provides a buoyant force using compressed air to lift or support items in the water column. These Lift Bags are sized to provide a force of approximately 35 tons. The I/O is 16. [P40A / HY221 - ADVANCED POWER GENERATOR]: This system generates electrical power using solar and wind energy and stores it in super-efficient. Lithium Ion Batteries. The system is capable of supplying electrical power to operate a Command Van, Salvage Shop Van and a Salvage Battle Damage Repair (BDR) Rigging Van for up to 5 days with no traditional petroleum fueled electrical power generator support. I/O is 8. [P40A / HY227 - COMPLEX AND/OR LARGE UWSH REPAIR COFFERDAM SUPPORT SYSTEMS]: Special purpose underwater tools, equipment, cofferdams and habitat with a higher complexity and or size used by divers to perform routine and emergent repairs on all classes of surface ship and submarines. I/O is 15. [P40A / HY228 - CLYDE WINCH UPGRADE MODIFICATIONS]: Portable Clyde deck winch consists of a dual drum assembly and a horizontal capstan mounted on the side of the deck winch. The deck winch is hydraulically driven by a self contained diesel engine and each drum/ capstan can pull up to 8 tons. The drive mechanism and braking system is upgraded to a hydraulic control and operation. Required I/O is 20. [P40A / HY230 - NEXGEN HYDRAULIC POWER UNIT, MOD 6B]: This Hydraulic Power Unit is designed to provide the hydraulic fluids to operate US Navy Salvage equipment including the Beach Gear system. The hydraulic power unit is silenced for significant personnel safety and meets the latest environmental standards for clean air. Required I/O is 60. [P40A / HY232 - DECK SYSTEMS HYDRAULIC POWER UNIT UPGRADE]: Deck Systems Hydraulic Power Unit (HPU) Upgrade: The Hydraulic Power Units the provide hydraulic fluid to operate the Portable Capstan are at the end of their service life and are no longer supported by the manufacturer. New HPU is more reliable, simpler to maintain, and is sound silenced for enhanced personnel safety. Required I/O is 22. [P40A / HY237 - COMMAND CONFERENCE CENTER]: Provides a large expandable office area that is attached to the Salvage Command Van or can operate independently. Space will be environmentally controlled, able to be quickly unpacked with hard sides, and when repacked the shipping foot print will be a 20 ft connex box. Required I/O is 8. [P40A / HY238 - SALVAGE EQUIPMENT TRANSPORT AND LANDING CRAFT]: A cargo vessel designed to operate with a two-person crew, cargo capacity of at least 5000 lbs, articulating crane to pick up and load cargo from the pier, A-frame to load or unload cargo, bow ramp to drive on or off, and is capable of road transportation or airlift. Cruise speed is 25 knots at full load, a pusher bow attachment, and a tow bar. Required I/O is 8. [P40A / HY240 - SALVAGE PATCHING & RIGGING VAN]: This system is for emergency response to ship casualties and provides the necessary material to construct custom patches and cofferdams. The kit also includes tools to install the custom built items in place over the damaged hull sections. Required I/O is 8. LI 1130 - Diving and Salvage Equipment Navy UNCLASSIFIED Page 7 of 24 P-1 Line #26 Volume 1 - 501 === page 580 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 11: Ocean Engineering ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1130 / Diving and Salvage Equipment Program Elements for Code B Items: N/A Other Related Program Elements: 0204561N, 0204454N, 0204423N, 0203424N, 0603713N Line Item MDAP/MAIS Code: N/A [P40A / HY241 - DEEP OCEAN SALVAGE SYSTEM]: Heave compensated lift system with power unit and ancillary equipment for executing deep water recovery operations. Required I/O is 2. [P40A / HY247 - HYDRAULLIC CHAIN HOIST (25 TON)]: This system provides a means to lift loads utilizing rigging points under water. These Hydraulic Chain Hoists are specially designed for underwater use and are sized to safely lift 25 tons. Required I/O is 10. [P40A / HY265 - POWER GENERATOR 200 KW]: Large diesel driven power generation set capable of providing power to operate SUPSALV Remote Operated Vehicle (ROV) systems. Forward deployed at all Emergency Ship Salvage Material (ESSM) Facilities to ensure ROV Systems always have access to redundant source of power to support USN contingency operational requirements. I/O is 8 [P40A / HY266 - 600 CFM SALVAGE AIR COMPRESSOR (TIER 4)]: Air compressor, diesel driven, with volume capable of pressurizing ship compartments for dewatering and able to support other fleet salvage operations requiring large volumes of pressurized air. I/O is 8 [P40A / HY267 - DIAMOND WIRE SAW CUTTING SYSTEM]: Salvage cutting systems designed to cut small to medium ship hulls using a simple diamond impregnated wire. Used for Harbor clearance operations or any fleet operation which requires ship hull sections to be cut. I/O is 4 [P40A / HY268 - SALVAGE HYDRAULIC CUTTER SYSTEM]: Hydraulically operated tools for cutting or moving metal hull pieces, piping, cabling, etc. during salvage operations, harbor clearance ops, or any fleet operations in which removing of interference items are needed. I/O is 8 [P40A / HY269 - SALVAGE FIRE FIGHTING KIT]: Fire-fighting Kit designed to be used with the Salvage Jetting Pump system and provides a Fire Fighting Monitor, auxiliary equipment for foam, and other equipment for salvage team to fire a shipboard fire from the pier or Vessel of Opportunity (VOO). I/O is 8 [P40A / HY282 - SALVAGE ROLLER BAG]: Salvage roller systems designed to roll small to medium ship hulls using a simple diamond impregnated bags. Used for Sarbor clearance operations or any fleet operation which requollers ship hull sections to be rolled. [P40A / HY283 - MAGNETIC PATCH KIT UPGRADES]: Patch Kit Upgrade adds the latest technology of patching materials for salvors to utilize in combating flooding casualties due to combat, grounding, or collision. Patching material encompass a wide variety of methodologies to ensure salvors have a complete selection of options to respond to a wide variety of scenarios. [P40A / HY284 - PIER/VOO FIRE FIGHTING SYSTEMS]: Fire Fighting System is an independant complete system for set up on a Pier or Vessel of Opportunity (VOO) for applying large volumes of water onto a ship for shore facility to combat a major casualty involving fire. Systems include energy source, pumps hoses, monitors, and control consoles needed to fight a major casualty. [P40A / HY285 - TOWING KIT]: Equipment basket to conduct emergent tows for Naval vessels. Kit would contain certified bridles and tow jewelry required for those tows to allow rapid deployment. I/O is 7. [P40A / HY299 - UNDERWATER SHIP HUSBANDRY (UWSH) STORAGE & SHIPPING CONTAINERS]: Special purpose portable storage and shipping containers to support various complex underwater ship husbandry equipment and/or rigging operational kits. Each container provides controlled storage and a secure shipping footprint. I/O is 60 [P40A / HY302 - AUV SPARE VEHICLE]: Autonomous Underwater Vehicle (AUV) for conducting search down to 20,000 feet for critical DOW assets recovery and mapping of debris field. Second vehicle to support critical contingency operation to ensure mission success. [P40A / HY314 -SPARE AUV HANDLING SYSTEM]: Autonomous Underwater Vehicle (AUV) Handling System to launch, recover, and house AUV. Required for conducting search operations down to 20,000 feet for critical DOW assets recovery and mapping of debris field. Second AUV Handling System to support critical contingency operations to ensure mission success. [P40A / HY315 FULL OCEAN DEPTH ROV]: Provides Remotely Operated Vehicle Rated for Full Ocean Depth Capability. Required I/O is 1. LI 1130 - Diving and Salvage Equipment Navy UNCLASSIFIED Page 8 of 24 P-1 Line #26 Volume 1 - 502 === page 581 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 11: Ocean Engineering ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1130 / Diving and Salvage Equipment Program Elements for Code B Items: N/A Other Related Program Elements: 0204561N, 0204454N, 0204423N, 0203424N, 0603713N Line Item MDAP/MAIS Code: N/A [P40A / HY316 FULL OCEAN DEPTH AUV]: Provides an Autonomous Underwater Vehicle (AUV) Rated for Full Ocean Depth Capability. Required I/O is 1. [P40A / HY320 FULL OCEAN DEPTH LINE SPOOLER]: Provides air transportable take up reel, level wind to stow lifting line supporting full ocean depth recovery through the fly away deep ocean salvage system. Required I/O is 1. LI 1130 - Diving and Salvage Equipment Navy UNCLASSIFIED Page 9 of 24 P-1 Line #26 Volume 1 - 503 === page 582 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 11: Ocean Engineering ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1130 / Diving and Salvage Equipment Program Elements for Code B Items: N/A Other Related Program Elements: 0204561N, 0204454N, 0204423N, 0203424N, 0603713N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Diving and Salvage Equipment P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 87.633 - / 14.000 - / 7.842 - / 33.013 - / 87.633 - / 14.000 - / 7.842 - / 33.013 - / - - / 33.013 / 0.000 - / 33.013 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. LI 1130 - Diving and Salvage Equipment Navy UNCLASSIFIED Page 10 of 24 P-1 Line #26 Volume 1 - 504 === page 583 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1130 / Diving and Salvage Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 11 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Diving and Salvage Equipment Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) DIVING (N97) 1.1) HY176 - HP AIR COMPRESSORS (†) 1.2) HY177 - AIR PURIFICATION UNITS A A (†) 1.3) HY179 - NAVY EXPERIMENTAL A (†) DIVING UNIT 1.4) HY199 - NAVY DIVE COMPUTER (†) 1.5) HY210 COMPACT DIVER LIFE SUPPORT SYSTEM AIR SUPPLY 19 0.875 - - - 81,380.00 58,416.67 60 3.505 48,690.00 1 0.049 808,800.00 15 12.132 704,000.00 1 0.704 717,000.00 1,558.80 1,471 2.293 1,711.00 232 0.397 1,762.00 21,933.33 15 0.329 22,370.00 15 0.336 4,889.00 1,045 5.109 5,430.00 70 0.380 1,048.93 838 0.879 1,140.00 18 0.021 109,538.46 13 1.424 117,520.00 1 0.118 119,870.00 - 1 0.081 - - - - - - - - - - - - - - - - - - - - 1 0.717 735,000.00 1 0.735 - - - 735,000.00 1 0.735 185 0.326 59 0.138 - - - 2,338.98 59 0.138 22,820.00 15 0.342 - - - - - - - 5,542.00 70 0.388 5,653.00 80 0.452 - - - 5,653.00 80 0.452 - - 1,333.00 25 0.033 - - - 1,333.00 25 0.033 0.120 122,267.00 1 0.122 - - - 122,267.00 1 0.122 2,338.98 A - - (†) 1.6) HY213 - HP COMPOSITE FLASK REPLACEMENT REGULATORS A (†) 1.7) HY224 - SCUBA (†) 1.8) HY233 SURFACE SUPPLY AUGMENTED SCUBA SYSTEM A - A 1 (†) 1.9) HY249 - DIVER LAUNCH AND RECOVERY SYSTEM (LARS) A 46,052.63 A - - - 338,090.00 1 0.338 39 0.434 11,440.00 19 0.217 - - - - - - - 351,737.00 1 0.352 - - - 351,737.00 1 0.352 20 0.234 13,562.00 17 0.231 - - - 13,562.00 17 0.231 - - 1,055K 1 1.055 - - - 1,055K 1 1.055 (†) 1.10) HY271 SURFACE SUPPLIED DIVING HELMET A 11,128.21 11,675.00 (†) UPGRADE 1.11) HY272 MULTI-OCCUPANT FLEXIBLE RECOMPRESSION CHAMBER A - - - (†) SYSTEM 1.12) HY273 CHAMBER VAN A (†) UPGRADE 1.13) HY274 - DIVER AUGMENTED A 178,333.33 3 0.535 182,060.00 3 0.546 185,700.00 5 0.929 - - - - - - - - - 75,400.00 15 1.131 6 0.467 8 0.636 - - - - - - - - - LI 1130 - Diving and Salvage Equipment Navy 77,900.00 79,500.00 UNCLASSIFIED Page 11 of 24 P-1 Line #26 Volume 1 - 505 === page 584 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1130 / Diving and Salvage Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 11 Prior Years MDAP/ Item Number / Title [DODIC] ID CD VISUAL DISPLAY MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Diving and Salvage Equipment Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) (†) (DAVD) GEN 3 1.14) HY289 TRANSPORTABLE RECOMPRESSION CHAMBER SYSTEM CHAMBER A 8,000.00 6 0.048 8,086.00 3 0.024 8,248.00 3 136,750.00 4 0.547 140,962.00 1 0.141 - - 0.025 - - - - - - - 2 0.293 - - - 146,656.00 3 48,450.00 - - (†) UPGRADE KIT 1.15) HY290 - DIVER AUGMENTED VISUAL DISPLAY (DAVD) 3D SONAR WITH GPC A - 146,656.00 48,450.00 2 0.293 3 0.145 (†) UPGRADE 1.16) HY317 - AIR RACK UPGRADE (†) A Subtotal: 1) DIVING (N97) - - - - - - - - - 0.145 - - - - - 29.241 - - 3.738 - - 3.798 - - 3.556 - - - - - 3.556 - - - - - - - - - 2) NAVAL SPECIAL WARFARE (NSW) SERVICE-COMMON EQUIPMENT (N95) 2.1) HY291 - (NSW) (†) A HP COMPRESSOR 2.2) HY293 - (NSW) (†) A HASKEL PUMPS 2.3) HY294 (NSW) NAVY DIVE A (†) COMPUTER 2.4) HY296 (NSW) DIVER LIFE SUPPORT SYSTEM (DLSS) CHARGING - - - 92,007.00 1 0.092 - - - 38,666.67 3 0.116 39,690.00 4 0.159 - - - 42,532.00 8 0.340 - - - 42,532.00 8 0.340 1,656.72 201 0.333 1,716.48 261 0.448 - - - 2,000.00 24 0.048 - - - 2,000.00 24 0.048 - - 349,627.00 1 0.350 - - - - - - - - - - - - 0.364 378,872.00 2 0.758 - - - - - - - - - - - - 689 1.379 2,081.82 110 0.229 - - - 2,081.82 110 0.229 - - 783,000.00 1 0.783 - - - 783,000.00 1 0.783 A - (†) VAN 2.5) HY297 (NSW) STANDARD DOUBLE LOCK RECOMPRESSION CHAMBER VAN A 364,000.00 1 (†) UPGRADE 2.6) HY307 - (NSW) DIVING SUPPORT EQUIPMENT SCUBA A - - - - - - - - - - - - 2,001.00 (†) DIVING SYSTEMS 2.7) HY308 - (NSW) DIVING SUPPORT EQUIPMENT ROV SYSTEM A LI 1130 - Diving and Salvage Equipment Navy - UNCLASSIFIED Page 12 of 24 P-1 Line #26 Volume 1 - 506 === page 585 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1130 / Diving and Salvage Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 11 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 2.8) HY309 (NSW) MK25 A REPLACEMENT MAIS Code (†) Subtotal: 2) NAVAL SPECIAL WARFARE (NSW) SERVICECOMMON EQUIPMENT (N95) Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Diving and Salvage Equipment Unit Cost ($ M) ($) - - - - - - - - - - - 0.813 - - 1.807 - - 1.379 - - 17,956.27 FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) 343 6.159 - - - - - 7.559 - - - - - - - - - - - - - 17,956.27 Total Cost Qty (Each) ($ M) 343 6.159 - - 7.559 - - - - - - - - - 3) MOBILE DIVING SALVAGE UNIT (MDSU) OUTFITTING EQUIPMENT (N95) 3.1) HY262 - (MDSU) DIVER AUGMENTED VISUAL DISPLAY (DAVD) GEN 3 A 20,428.57 7 0.143 20,810.00 1 0.021 1,100.00 20 0.022 1,170.00 7 0.008 1,000.00 7 0.007 1,636.36 88 0.144 1,720.00 50 0.086 1,740.00 8 0.014 1,750.00 7 0.012 - - - 1,750.00 7 0.012 75,000.00 2 0.150 77,900.00 1 0.078 79,572.00 4 0.318 81,141.00 2 0.162 - - - 81,141.00 2 0.162 136,500.00 2 0.273 140,964.00 1 0.141 - - - 145,000.00 1 0.145 - - - 145,000.00 1 0.145 (†) UPGRADE KIT 3.2) HY263 - (MDSU) SELF CONTAINED UNDERWATER BREATHING APPARATUS REGULATORS A (†) 3.3) HY264 (MDSU) NAVY DIVE A (†) COMPUTER 3.4) HY277 - (MDSU) DIVER AUGMENTED VISUAL DISPLAY A (†) (DAVD) GEN 3 3.5) HY298 (MDSU) DAVD 3D SONAR WITH GPS A (†) UPGRADE Subtotal: 3) MOBILE DIVING SALVAGE UNIT (MDSU) OUTFITTING EQUIPMENT (N95) - - 0.732 - - 0.334 - - 0.339 - - 0.319 - - - - - 0.319 - - - - - - - - - - - - - - - - - - - - - - 1.826 - - - 1,826K 4) EXPLOSIVE ORDNANCE DISPOSAL (EOD) DIVING & SALVAGE EQUIPMENT (N95) 4.1) HY279 - (EOD) DIVER TELEMTRY SYSTEM A 4.2) HY300 - (EOD) TRANSPORTABLE RECOMPRESSION CHAMBER SYSTEM A 20,979.17 48 1.007 - 1,654K 3 4.961 1,688K 2 3.375 - - - - - 1,925K 1 1.925 - - - 1,826K (†) (TRCS) 4.3) HY301 - (EOD) STANDARD NAVY DOUBLE-LOCK RECOMPRESSION CHAMBER (SNDL) A - - 1 1 1.826 (†) LI 1130 - Diving and Salvage Equipment Navy UNCLASSIFIED Page 13 of 24 P-1 Line #26 Volume 1 - 507 === page 586 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1130 / Diving and Salvage Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 11 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 4.4) HY310 (EOD) NAVY DIVE COMPUTER LO A MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Diving and Salvage Equipment Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - - - - - 3,663.00 218 0.799 - - - - - - - - - - - - - - - 143,780.00 1 0.144 - - - - - - - - - - - - - - - 45,000.00 1 0.045 - - - - - - - - - - - - - - - 344,860.00 1 0.345 - - - - - - - - - - - 5.968 - - 5.300 - - 1.333 - - 1.826 - - - - - 1.826 144,000.00 24 3.456 180,249.00 0.360 - - - - - - - - - - - - 1,779K 2 3.558 - - - - - - - - - - - - - 193,909.09 22 4.266 130,000.00 4 0.538 - - - 134,500.00 4 0.538 270,166.67 12 3.242 123,500.00 10 1.235 116,000.00 146,000.00 8 1.168 - 106,444.44 9 0.958 - (†) MU 4.5) HY311 (EOD) DAVD 3D SONAR WITH GPC A (†) UPGRADE 4.6) HY312 (EOD) NAVY DIVE A (†) COMPUTER 4.7) HY313 - (EOD) DIVER LAUNCH AND RECOVERY SYSTEM (LARS) A (†) Subtotal: 4) EXPLOSIVE ORDNANCE DISPOSAL (EOD) DIVING & SALVAGE EQUIPMENT (N95) 5) SALVAGE (N97) 5.1) HY116 PORTABLE SUBMERSIBLE PUMPS A 2 (†) 5.2) HY131 - REMOTE OPERATED VEHICLES (ROV) HANDLING SYSTEM A 5.4) HY145 COFFERDAM A - - (1) (†) SYSTEM 5.5) HY146 PROPELLER SYSTEM REPAIR KIT 3 0.390 129,000.00 1 0.129 134,500.00 A - - - - - - 269,000.00 1 0.269 - - - 269,000.00 1 0.269 0.116 - - - 118,000.00 1 0.118 - - - 118,000.00 1 0.118 - - - - - - - - - - - 0.130 - - - (†) 5.7) HY169 UNDERWATER SHIP HUSBANDRY (UWSH) POWER A 1 (†) TOOLS 5.8) HY186 - SMART TOW SYSTEMS A 5.9) HY190 VIDEO/CAMERA A (†) EQUIPMENT LI 1130 - Diving and Salvage Equipment Navy 125,000.00 1 0.125 130,000.00 UNCLASSIFIED Page 14 of 24 - 1 P-1 Line #26 130,000.00 - 1 0.130 Volume 1 - 508 === page 587 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1130 / Diving and Salvage Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 11 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 5.10) HY195 UNDERWATER RIGGING SUPPORT A MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Diving and Salvage Equipment Unit Cost ($ M) ($) 222,666.67 15 3.340 - - - - - - 542,117.65 17 9.216 - - - - - - 263,125.00 8 2.105 - - - 150,096.77 31 4.653 142,000.00 Qty (Each) 215,500.00 FY 2027 OOC Total Cost Unit Cost ($ M) 2 ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) 0.431 - - - - - - - Total Cost Qty (Each) 215,500.00 ($ M) 2 0.431 (†) SYSTEM 5.11) HY196 UNDERWATER SHIP HUSBANDRY (UWSH) SUBMARINE SUPPORT SYSTEM A 5.12) HY197 UNDERWATER SHIP HUSBANDRY (UWSH) PIERSIDE A SUPPORT VANS - - - 245,000.00 1 0.245 250,000.00 1 0.250 - - - 250,000.00 1 0.250 0.710 153,000.00 1 0.153 152,000.00 3 0.456 - - - 152,000.00 3 0.456 1 3.626 - - - 3,626K 1 3.626 - - - - - A 5 (†) 5.14) HY200 - DEEP DRONE UPGRADE (†) A 5.16) HY204 - 400 AMP WELDERDIESEL A 5.17) HY205 LIGHTING KIT SYSTEM A 5.18) HY206 KERRIE CABLE UNDERWATER A CUTTING SYSTEM A (†) 5.23) HY219 - PORTABLE SALVAGE CRANE A 5.24) HY221 ADVANCED POWER A (†) GENERATOR 5.25) HY227 - COMPLEX AND/OR LARGE UWSH REPAIR COFFERDAM - - - - - - - - - 3,626K - 29,666.67 3 0.089 - - - - - - - - - 15,769.23 26 0.410 - - - - - - 56,500.00 2 0.113 - - - 56,500.00 2 0.113 18,000.00 18 0.324 - - - - - - 29,000.00 1 0.029 - - - 29,000.00 1 0.029 - - - - - - - - 75,000.00 1 0.075 - - - 75,000.00 1 0.075 - - - - - - - - - - - - - - - 0.286 - - - - - - - - - - - - - - - - 0.757 - - - (†) 5.20) HY216 SAL/ BDR MATERIAL KIT - (†) 5.13) HY198 UNDERWATER SHIP HUSBANDRY (UWSH) SURFACE SHIP SUPPORT SYSTEMS - - 206,500.00 2 0.413 278,000.00 2 0.556 286,000.00 738,200.00 5 3.691 1 A LI 1130 - Diving and Salvage Equipment Navy - - UNCLASSIFIED Page 15 of 24 757,000.00 1 P-1 Line #26 757,000.00 1 0.757 Volume 1 - 509 === page 588 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1130 / Diving and Salvage Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 11 Prior Years MDAP/ Item Number / Title [DODIC] ID CD SUPPORT SYSTEMS MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Diving and Salvage Equipment Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) (†) 5.26) HY228 - CLYDE WINCH UPGRADE MODIFICATIONS A 5.27) HY230 - NEXGEN HYDRAULIC POWER A UNIT, MOD 6B 109,111.11 18 1.964 - - - - 102,600.00 5 0.513 - - - 129,090.00 27,111.11 9 0.244 0.161 49,820.00 107,000.00 2 0.214 287,000.00 2 0.574 420,000.00 745,000.00 2 1.490 - 105,200.00 5 0.526 - - - - - - - - - - - 2 0.258 - - - - - - - - - 1 0.050 - - - - - - - - - (†) 5.28) HY232 DECK SYSTEMS HYDRAULIC POWER A 40,125.00 4 (†) UNIT UPGRADE 5.29) HY237 - COMMAND CONFERENCE CENTER A 5.30) HY238 - SALVAGE EQUIPMENT TRANSPORT AND A - - - - - - - - - - - - - - - 0.420 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.207 - - - - - - - - - - - - - - - 0.335 - - - - - - - - - - - - - - - 0.344 - - - - - - - - - - - - - - - - - - - - - 0.067 - - - 1 (†) LANDING CRAFT 5.32) HY241 - DEEP OCEAN SALVAGE SYSTEM A 5.33) HY247 HYDRAULLIC CHAIN HOIST (25 TON) A 5.34) HY265 - POWER GENERATOR 200 KW A 5.35) HY266 - 600 CFM SALVAGE AIR COMPRESSOR (TIER 4) A 5.36) HY267 DIAMOND WIRE SAW CUTTING A - - 167,500.00 - 2 - - 344,000.00 1 (†) SYSTEM 5.37) HY268 - SALVAGE HYDRAULIC CUTTER SYSTEM A 5.38) HY269 SALVAGE FIRE A (†) FIGHTING KIT 96,000.00 2 0.192 - - - - - - 64,666.67 3 0.194 - - - - - - LI 1130 - Diving and Salvage Equipment Navy UNCLASSIFIED Page 16 of 24 67,000.00 1 P-1 Line #26 67,000.00 1 0.067 Volume 1 - 510 === page 589 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1130 / Diving and Salvage Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 11 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 5.39) HY282 SALVAGE ROLLER BAG A 5.40) HY283 MAGNETIC PATCH KIT UPGRADES A 5.41) HY284 - PIER/ VOO FIRE FIGHTING SYSTEMS A 5.42) HY285 TOWING KIT A 5.43) HY299 UNDERWATER SHIP HUSBANDRY (UWSH) STORAGE & SHIPPING A MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Diving and Salvage Equipment Unit Cost ($ M) ($) 239,000.00 1 0.239 - - - - - - 133,000.00 1 0.133 - - - - - - - 356,000.00 1 0.356 - - - - - - 359,000.00 1 0.359 - - - - - - 31,380.95 21 0.659 - - - - - - - - - - - - - Subtotal: 5) SALVAGE (N97) - - 50.879 - - Total - - 87.633 - - 34,000.00 1 0.034 33,000.00 1 Qty (Each) 280,000.00 FY 2027 OOC Total Cost Unit Cost ($ M) 1 ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) 280,000.00 ($ M) 0.280 - - - 1 0.280 - - - - - - - - - - - - - - - - - - - - - - - - - - 0.033 33,000.00 1 0.033 - - - 33,000.00 1 0.033 - - 11,615K 1 11.615 - - - 11,615K 1 11.615 - - - 966,250.00 1 0.966 - - - 966,250.00 1 0.966 2.821 - - 0.993 - - 19.753 - - - - - 19.753 14.000 - - 7.842 - - 33.013 - - - - - 33.013 (†) CONTAINERS 5.46) HY315 FULL OCEAN DEPTH A (†) ROV 5.48) HY320 FULL OCEAN DEPTH LINE A (†) SPOOLER Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) HY131 - A deep ocean salvage mission specific ROV (Remotely Operated Vehicle) LARS (Launch and Recovery System). This modernized ROV handling system will accommodate capability increases in ROV max depth and vehicle horsepower. The LARS will have a smaller logistics footprint [as compared to obsolete legacy program systems] allowing the added option of commercial air shipment which improves global rapid response and cost effectiveness in support of a sustained high salvage OPTEMPO, especially in Westpac. LI 1130 - Diving and Salvage Equipment Navy UNCLASSIFIED Page 17 of 24 P-1 Line #26 Volume 1 - 511 === page 590 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 11 Aggregated Items: Diving and Salvage Equipment FY Contractor and Location Method/Type or Funding Vehicle 1.1) HY176 - HP AIR COMPRESSORS 2026 GLOBAL PCCI / IRVINE CA C / CPFF WASHINGTON, DC Feb 2026 Feb 2027 1 81,380.00 Y 1.2) HY177 - AIR PURIFICATION UNITS 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC May 2025 May 2026 1 48,690.00 Y 1.3) HY179 - NAVY EXPERIMENTAL DIVING UNIT 2025 Navy Experimental Diving Unit / Panama City, FL Various Panama City, FL Oct 2024 Oct 2025 1 704,000.00 Y 1.3) HY179 - NAVY EXPERIMENTAL DIVING UNIT 2026 Navy Experimental Diving Unit / Panama City, FL Various Panama City, FL Oct 2025 Oct 2026 1 717,000.00 Y 1.3) HY179 - NAVY EXPERIMENTAL DIVING UNIT 2027 TBD / TBD TBD Panama City, FL Oct 2026 Oct 2027 1 735,000.00 Y 1.4) HY199 - NAVY DIVE COMPUTER 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC May 2025 May 2026 232 1,711.00 Y 1.4) HY199 - NAVY DIVE COMPUTER 2026 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Feb 2026 Feb 2027 185 1,762.00 Y 1.4) HY199 - NAVY DIVE COMPUTER 2027 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 59 2,338.98 Y 1.5) HY210 - COMPACT DIVER LIFE SUPPORT SYSTEM AIR SUPPLY 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC May 2025 May 2026 15 22,370.00 Y 1.5) HY210 - COMPACT DIVER LIFE SUPPORT SYSTEM AIR SUPPLY 2026 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Feb 2026 Feb 2026 15 22,820.00 Y 1.6) HY213 - HP COMPOSITE FLASK REPLACEMENT 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC May 2025 May 2026 70 5,430.00 Y 1.6) HY213 - HP COMPOSITE FLASK REPLACEMENT 2026 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Feb 2026 Feb 2027 70 5,542.00 Y 1.6) HY213 - HP COMPOSITE FLASK REPLACEMENT 2027 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 80 5,653.00 Y 1.7) HY224 - SCUBA REGULATORS 2025 GLOBAL PCCI / IRVINE CA C / CPFF WASHINGTON, DC Apr 2025 Apr 2026 18 1,140.00 Y 1.8) HY233 - SURFACE SUPPLY AUGMENTED SCUBA SYSTEM 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC May 2025 May 2026 1 117,520.00 Y 1.8) HY233 - SURFACE SUPPLY AUGMENTED SCUBA SYSTEM 2026 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Feb 2026 Feb 2027 1 119,870.00 Y 1.8) HY233 - SURFACE SUPPLY AUGMENTED SCUBA SYSTEM 2027 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 1 122,267.00 Y 1.9) HY249 - DIVER LAUNCH AND RECOVERY SYSTEM (LARS) 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Feb 2026 Feb 2027 1 338,090.00 Y Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 1130 / Diving and Salvage Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) DIVING (N97) LI 1130 - Diving and Salvage Equipment Navy UNCLASSIFIED Page 18 of 24 P-1 Line #26 Volume 1 - 512 === page 591 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 11 Aggregated Items: Diving and Salvage Equipment FY Contractor and Location Method/Type or Funding Vehicle 1.9) HY249 - DIVER LAUNCH AND RECOVERY SYSTEM (LARS) 2027 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 1 351,737.00 Y 1.10) HY271 - SURFACE SUPPLIED DIVING HELMET UPGRADE 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC May 2025 May 2026 19 11,440.00 Y 1.10) HY271 - SURFACE SUPPLIED DIVING HELMET UPGRADE 2026 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Feb 2026 Feb 2027 20 11,675.00 Y 1.10) HY271 - SURFACE SUPPLIED DIVING HELMET UPGRADE 2027 TBD / TBD C / CPFF WASHINGTON, DC Oct 2026 Oct 2027 17 13,562.00 Y 1.11) HY272 - MULTI-OCCUPANT FLEXIBLE RECOMPRESSION CHAMBER SYSTEM 2027 TBD / TBD C / TBD WASHINGTON, DC Oct 2026 Oct 2027 1 1,055K Y 1.12) HY273 - CHAMBER VAN UPGRADE 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Jun 2025 Jun 2026 3 182,060.00 Y 1.12) HY273 - CHAMBER VAN UPGRADE 2026 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Oct 2026 Oct 2027 5 185,700.00 Y 1.13) HY274 - DIVER AUGMENTED VISUAL DISPLAY (DAVD) GEN 3 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC May 2025 May 2026 6 77,900.00 Y 1.13) HY274 - DIVER AUGMENTED VISUAL DISPLAY (DAVD) GEN 3 2026 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Oct 2026 Oct 2027 8 79,500.00 Y 1.14) HY289 - TRANSPORTABLE RECOMPRESSION CHAMBER SYSTEM CHAMBER UPGRADE KIT 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC May 2025 May 2026 3 8,086.00 Y 1.14) HY289 - TRANSPORTABLE RECOMPRESSION CHAMBER SYSTEM CHAMBER UPGRADE KIT 2026 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Oct 2026 Oct 2027 3 8,248.00 Y 1.15) HY290 - DIVER AUGMENTED VISUAL DISPLAY (DAVD) 3D SONAR WITH GPC UPGRADE 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC May 2025 May 2026 1 140,962.00 Y 1.15) HY290 - DIVER AUGMENTED VISUAL DISPLAY (DAVD) 3D SONAR WITH GPC UPGRADE 2027 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 2 146,656.00 Y 1.16) HY317 - AIR RACK UPGRADE 2027 TBD / TBD C / CPFF WASHINGTON, DC Oct 2026 Oct 2027 3 48,450.00 Y Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 1130 / Diving and Salvage Equipment LI 1130 - Diving and Salvage Equipment Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 19 of 24 P-1 Line #26 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date Volume 1 - 513 === page 592 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 11 Item Number / Title [DODIC] O O C FY Contractor and Location P-1 Line Item Number / Title: 1130 / Diving and Salvage Equipment Method/Type or Funding Vehicle Aggregated Items: Diving and Salvage Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 2) NAVAL SPECIAL WARFARE (NSW) SERVICE-COMMON EQUIPMENT (N95) 2.1) HY291 - (NSW) HP COMPRESSOR 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Apr 2025 Apr 2026 1 92,007.00 Y 2.2) HY293 - (NSW) HASKEL PUMPS 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Apr 2025 Apr 2026 4 39,690.00 Y 2.3) HY294 - (NSW) NAVY DIVE COMPUTER 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Feb 2025 Feb 2026 261 1,716.48 Y 2.3) HY294 - (NSW) NAVY DIVE COMPUTER 2027 TBD / TBD C / CPFF WASHINGTON, DC Oct 2026 Oct 2027 24 2,000.00 Y 2.4) HY296 - (NSW) DIVER LIFE SUPPORT SYSTEM (DLSS) CHARGING VAN 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Apr 2025 Apr 2026 1 349,627.00 Y 2.5) HY297 - (NSW) STANDARD DOUBLE LOCK RECOMPRESSION CHAMBER VAN UPGRADE 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Apr 2025 Apr 2026 2 378,872.00 Y 2.6) HY307 - (NSW) DIVING SUPPORT EQUIPMENT SCUBA DIVING SYSTEMS 2026 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 689 2,001.00 Y 2.6) HY307 - (NSW) DIVING SUPPORT EQUIPMENT SCUBA DIVING SYSTEMS 2027 TBD / TBD TBD WASHINGTON, DC Jun 2027 Jun 2028 110 2,081.82 Y 2.8) HY309 - (NSW) MK25 REPLACEMENT 2027 TBD / TBD C / CPFF WASHINGTON, DC Oct 2026 Oct 2027 343 17,956.27 Y 3) MOBILE DIVING SALVAGE UNIT (MDSU) OUTFITTING EQUIPMENT (N95) 3.1) HY262 - (MDSU) DIVER AUGMENTED VISUAL DISPLAY (DAVD) GEN 3 UPGRADE KIT 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC May 2025 May 2026 1 20,810.00 Y 3.2) HY263 - (MDSU) SELF CONTAINED UNDERWATER BREATHING APPARATUS REGULATORS 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Feb 2025 Feb 2026 7 1,170.00 Y 3.2) HY263 - (MDSU) SELF CONTAINED UNDERWATER BREATHING APPARATUS REGULATORS 2026 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Oct 2026 Oct 2027 7 1,000.00 Y 3.3) HY264 - (MDSU) NAVY DIVE COMPUTER 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC May 2025 May 2026 50 1,720.00 Y 3.3) HY264 - (MDSU) NAVY DIVE COMPUTER 2026 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 8 1,740.00 Y LI 1130 - Diving and Salvage Equipment Navy UNCLASSIFIED Page 20 of 24 P-1 Line #26 Volume 1 - 514 === page 593 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 11 Aggregated Items: Diving and Salvage Equipment FY Contractor and Location Method/Type or Funding Vehicle 3.3) HY264 - (MDSU) NAVY DIVE COMPUTER 2027 TBD / TBD TBD WASHINGTON, DC May 2027 May 2028 7 1,750.00 Y 3.4) HY277 - (MDSU) DIVER AUGMENTED VISUAL DISPLAY (DAVD) GEN 3 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC May 2025 May 2026 1 77,900.00 Y 3.4) HY277 - (MDSU) DIVER AUGMENTED VISUAL DISPLAY (DAVD) GEN 3 2026 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 4 79,572.00 Y 3.4) HY277 - (MDSU) DIVER AUGMENTED VISUAL DISPLAY (DAVD) GEN 3 2027 TBD / TBD TBD WASHINGTON, DC May 2027 May 2028 2 81,141.00 Y 3.5) HY298 - (MDSU) DAVD 3D SONAR WITH GPS UPGRADE 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC May 2025 May 2026 1 140,964.00 Y Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 1130 / Diving and Salvage Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 4) EXPLOSIVE ORDNANCE DISPOSAL (EOD) DIVING & SALVAGE EQUIPMENT (N95) 4.2) HY300 - (EOD) TRANSPORTABLE RECOMPRESSION CHAMBER SYSTEM (TRCS) 2025 TBD / TBD TBD WASHINGTON, DC Sep 2025 Sep 2026 2 1,688K Y 4.3) HY301 - (EOD) STANDARD NAVY DOUBLE-LOCK RECOMPRESSION CHAMBER (SNDL) 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Apr 2025 Apr 2026 1 1,925K Y 4.3) HY301 - (EOD) STANDARD NAVY DOUBLE-LOCK RECOMPRESSION CHAMBER (SNDL) 2027 TBD / TBD C / TBD WASHINGTON, DC Oct 2026 Oct 2027 1 1,826K Y 4.4) HY310 - (EOD) NAVY DIVE COMPUTER LO MU 2026 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 218 3,663.00 Y 4.5) HY311 - (EOD) DAVD 3D SONAR WITH GPC UPGRADE 2026 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 1 143,780.00 Y 4.6) HY312 - (EOD) NAVY DIVE COMPUTER 2026 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 1 45,000.00 Y 4.7) HY313 - (EOD) DIVER LAUNCH AND RECOVERY SYSTEM (LARS) 2026 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 1 344,860.00 Y 5.1) HY116 - PORTABLE SUBMERSIBLE PUMPS 2025 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 2 180,249.00 Y 5.4) HY145 - COFFERDAM SYSTEM 2025 GPC / IRVINE, CA C / CPFF WASHINGTON, DC May 2026 May 2027 3 130,000.00 Y 5) SALVAGE (N97) LI 1130 - Diving and Salvage Equipment Navy UNCLASSIFIED Page 21 of 24 P-1 Line #26 Volume 1 - 515 === page 594 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 11 Aggregated Items: Diving and Salvage Equipment FY Contractor and Location Method/Type or Funding Vehicle 5.4) HY145 - COFFERDAM SYSTEM 2026 GPC / IRVINE, CA C / CPFF WASHINGTON, DC May 2026 May 2027 1 129,000.00 Y 5.4) HY145 - COFFERDAM SYSTEM 2027 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 4 134,500.00 Y 5.5) HY146 - PROPELLER SYSTEM REPAIR KIT 2027 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 1 269,000.00 Y 5.7) HY169 - UNDERWATER SHIP HUSBANDRY (UWSH) POWER TOOLS 2025 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 1 116,000.00 Y 5.7) HY169 - UNDERWATER SHIP HUSBANDRY (UWSH) POWER TOOLS 2027 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 1 118,000.00 Y 5.9) HY190 - VIDEO/CAMERA EQUIPMENT 2026 GLOBAL PCCI / IRVINE CA C / CPFF WASHINGTON, DC May 2026 May 2027 1 125,000.00 Y 5.9) HY190 - VIDEO/CAMERA EQUIPMENT 2027 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 1 130,000.00 Y 5.10) HY195 - UNDERWATER RIGGING SUPPORT SYSTEM 2027 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 2 215,500.00 Y 5.12) HY197 - UNDERWATER SHIP HUSBANDRY (UWSH) PIERSIDE SUPPORT VANS 2026 GPC / IRVINE, CA C / CPFF WASHINGTON, DC May 2026 May 2027 1 245,000.00 Y 5.12) HY197 - UNDERWATER SHIP HUSBANDRY (UWSH) PIERSIDE SUPPORT VANS 2027 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 1 250,000.00 Y 5.13) HY198 - UNDERWATER SHIP HUSBANDRY (UWSH) SURFACE SHIP SUPPORT SYSTEMS 2025 TBD / TBD C / TBD ** NO PCO ** Oct 2024 Oct 2025 5 142,000.00 N 5.13) HY198 - UNDERWATER SHIP HUSBANDRY (UWSH) SURFACE SHIP SUPPORT SYSTEMS 2026 GLOBAL PCCI / IRVINE CA C / CPFF WASHINGTON, DC May 2026 May 2027 1 153,000.00 Y 5.13) HY198 - UNDERWATER SHIP HUSBANDRY (UWSH) SURFACE SHIP SUPPORT SYSTEMS 2027 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 3 152,000.00 Y 5.14) HY200 - DEEP DRONE UPGRADE 2027 TBD / TBD C / CPAF WASHINGTON, DC Oct 2026 Oct 2027 1 3,626K Y 5.18) HY206 - KERRIE CABLE UNDERWATER CUTTING SYSTEM 2027 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 1 29,000.00 Y Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 1130 / Diving and Salvage Equipment LI 1130 - Diving and Salvage Equipment Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 22 of 24 P-1 Line #26 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date Volume 1 - 516 === page 595 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 11 Aggregated Items: Diving and Salvage Equipment FY Contractor and Location Method/Type or Funding Vehicle 5.20) HY216 SAL/BDR MATERIAL KIT 2027 TBD / TBD C / FFP WASHINGTON, DC Oct 2026 Oct 2027 1 75,000.00 Y 5.24) HY221 - ADVANCED POWER GENERATOR 2025 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 1 286,000.00 Y 5.25) HY227 - COMPLEX AND/ OR LARGE UWSH REPAIR COFFERDAM SUPPORT SYSTEMS 2027 TBD / TBD TBD WASHINGTON, DC May 2027 May 2028 1 757,000.00 Y 5.27) HY230 - NEXGEN HYDRAULIC POWER UNIT, MOD 6B 2026 GLOBAL PCCI / IRVINE CA C / CPFF WASHINGTON, DC Feb 2026 Feb 2027 2 129,090.00 Y 5.28) HY232 - DECK SYSTEMS HYDRAULIC POWER UNIT UPGRADE 2025 GLOBAL PCCI / IRVINE CA C / CPFF WASHINGTON, DC Feb 2026 Feb 2027 4 40,125.00 Y 5.28) HY232 - DECK SYSTEMS HYDRAULIC POWER UNIT UPGRADE 2026 GLOBAL PCCI / IRVINE CA C / CPFF WASHINGTON, DC May 2027 May 2028 1 49,820.00 Y 5.30) HY238 - SALVAGE EQUIPMENT TRANSPORT AND LANDING CRAFT 2025 TBD / TBD TBD WASHINGTON, DC Dec 2026 Dec 2027 1 420,000.00 Y 5.36) HY267 - DIAMOND WIRE SAW CUTTING SYSTEM 2025 TBD / TBD TBD WASHINGTON, DC Dec 2025 Dec 2026 1 344,000.00 Y 5.38) HY269 - SALVAGE FIRE FIGHTING KIT 2027 TBD / TBD TBD WASHINGTON, DC May 2027 May 2028 1 67,000.00 Y 5.43) HY299 - UNDERWATER SHIP HUSBANDRY (UWSH) STORAGE & SHIPPING CONTAINERS 2025 TBD / TBD TBD WASHINGTON, DC Dec 2025 Dec 2026 1 34,000.00 Y 5.43) HY299 - UNDERWATER SHIP HUSBANDRY (UWSH) STORAGE & SHIPPING CONTAINERS 2026 GPC / IRVINE, CA C / CPFF WASHINGTON, DC Feb 2026 Feb 2027 1 33,000.00 Y 5.43) HY299 - UNDERWATER SHIP HUSBANDRY (UWSH) STORAGE & SHIPPING CONTAINERS 2027 TBD / TBD TBD WASHINGTON, DC Oct 2026 Oct 2027 1 33,000.00 Y 5.46) HY315 FULL OCEAN DEPTH ROV 2027 TBD / TBD C / CPAF WASHINGTON, DC Oct 2026 Oct 2027 1 11,615K Y 5.48) HY320 FULL OCEAN DEPTH LINE SPOOLER 2027 TBD / TBD C / CPFF WASHINGTON, DC Oct 2026 Oct 2027 1 966,250.00 Y Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 1130 / Diving and Salvage Equipment LI 1130 - Diving and Salvage Equipment Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 23 of 24 P-1 Line #26 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date Volume 1 - 517 === page 596 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 11 LI 1130 - Diving and Salvage Equipment Navy P-1 Line Item Number / Title: 1130 / Diving and Salvage Equipment UNCLASSIFIED Page 24 of 24 Aggregated Items: Diving and Salvage Equipment P-1 Line #26 Volume 1 - 518 === page 597 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 12: Small Boats ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0954 / Medium Unmanned Surface Vehicle (MUSVs) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 0.000 0.000 0.000 - - - 0.000 0.000 0.000 - - - 0.000 0.000 0.000 121.130 121.130 121.130 0.000 0.000 0.000 121.130 121.130 121.130 691.071 691.071 691.071 682.139 682.139 682.139 756.610 756.610 756.610 To FY 2031 Complete 811.650 811.650 811.650 Total - 3,062.600 - 3,062.600 - 3,062.600 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Medium Unmanned Surface Vessel Family of Systems (MUSV FoS) will ensure a suite of USV capability is delivered to the warfighter. There is an Urgent Operational Need (UON) that was validated by the Navy in August 2025 that requires a specific number of MUSVs by FY 2027. The Navy developed the USV Family of Systems (USV FoS) acquisition strategy in early 2026 to provide a comprehensive approach to delivering surface unmanned systems to warfighter at speed and scale. The USV FoS acquisition strategy is aligned to multiple theater priorities and there are urgent demand signals from the Fleet. MUSVs will be designed to employ modular payloads aligned with the CNO's Containerized Capabilities Campaign Plan, enabling the same containers to be fielded across the Fleet on existing platforms to deliver tailored offsets in accordance with the US Navy Fighting Instructions in support of the Golden Fleet initiatives. The MUSV is a foundational element of the Golden Fleet strategy, designed to work in concert with manned warships to increase battlespace awareness and distributed lethality. Central to this concept is the command and control (C2) relationship between manned and unmanned platforms. The program envisions guided-missile frigates (FF(X)) acting as a "quarterback," exercising direct C2 over large flotillas of MUSVs. This allows the frigate to extend its sensor and engagement reach significantly, leveraging the MUSVs as a distributed, forward-deployed extension of its own combat systems. Being a part of the Battleship flexible command-and-control ship set for both manned and unmanned systems, MUSV's can be led in a Surface Action Group, integrate with a Carrier Strike Group, or operate autonomously to secure critical sea lanes. By utilizing RAS C2 through use of Navy warfare system programs of record including BBG(X) Integrated Combat System (ICS), communications systems, and design reservations dedicated to future RAS C2 systems. The MUSV FoS will ensure competitive prototyping produces commercial-based vessel design integrated with platform machinery and autonomy software providing next-generation capabilities that align with Future Surface Combatant Force (FSCF). USV capabilities are being developed incrementally as technologies mature, ensuring efficient and affordable execution. MUSV FoS will focus on improving producibility by being non-exquisite, modular, and expanding competition with multiple vendors. The FY 2027 request for Medium Unmanned Surface Vehicle (MUSVs) includes $121,130 thousand of discretionary to acquire two vehicles and $50,000 thousand of mandatory for one additional vehicle for a total of $171,130 thousand and three vehicles. FY 2027 mandatory funds continue efforts from FY 2026 for continued vehicle procurement. LI 0954 - Medium Unmanned Surface Vehicle (MUSVs) Navy UNCLASSIFIED Page 1 of 7 P-1 Line #27 Volume 1 - 519 === page 598 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 12: Small Boats ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0954 / Medium Unmanned Surface Vehicle (MUSVs) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A The FY 2026 spend plan for Medium Unmanned Surface Vehicles (MUSV) includes $1,950,714 of mandatory (reconciliation) and $0 of discretionary funds for a total of $1,950,714. This finances 36 MUSV's to support the Golden Fleet vision. LI 0954 - Medium Unmanned Surface Vehicle (MUSVs) Navy UNCLASSIFIED Page 2 of 7 P-1 Line #27 Volume 1 - 520 === page 599 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 0954 / Medium Unmanned Surface Vehicle (MUSVs) Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 12: Small Boats ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Medium Unmanned Surface Vehicle (MUSVs) P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 0.000 - / 0.000 - / 0.000 - / 121.130 - / 0.000 - / 121.130 - / 0.000 - / 0.000 - / 0.000 - / 121.130 - / 0.000 - / 121.130 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The Medium Unmanned Surface Vessel Family of Systems (MUSV FoS) will ensure a suite of USV capability is delivered to the warfighter. There is an Urgent Operational Need (UON) that was validated by the Navy in August 2025 that requires a specific number of MUSVs by FY 2027. The Navy developed the USV Family of Systems (USV FoS) acquisition strategy in early 2026 to provide a comprehensive approach to delivering surface unmanned systems to warfighter at speed and scale. The USV FoS acquisition strategy is aligned to multiple theater priorities and there are urgent demand signals from the Fleet. LI 0954 - Medium Unmanned Surface Vehicle (MUSVs) Navy UNCLASSIFIED Page 3 of 7 P-1 Line #27 Volume 1 - 521 === page 600 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0954 / Medium Unmanned Surface Vehicle (MUSVs) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 12 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Medium Unmanned Surface Vehicle (MUSVs) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 - - - 0.000 0.000 0.000 - - - 0.000 0.000 0.000 - - - 0.000 0.000 0.000 FY 2027 Base FY 2027 OOC - - 121.130 FY 2027 Total - 0.000 - 121.130 - 121.130 - 0.000 - 121.130 - 121.130 - 0.000 121.130 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - MUSV Cost Recurring Cost 1.1.1) Vessel - - - - - - - - - 35,498K 2 70.996 - - - 35,498K 2 70.996 1.1.2) MUSV Platform Machinery and Automation - - - - - - - - - 7,000K 6 42.000 - - - 7,000K 6 42.000 1.1.3) Engineering Support - - - - - - - - - - - 8.134 - - - - - 8.134 Procurement (†) (1) Subtotal: Recurring Cost - - - - - - - - - - - 121.130 - - - - - 121.130 Subtotal: Hardware - MUSV Cost - - - - - - - - - - - 121.130 - - - - - 121.130 Gross/Weapon System Cost - - 0.000 - - 0.000 - - 0.000 - - 121.130 - - 0.000 - - 121.130 (†) indicates the presence of a P-5a Footnotes: (1) Previously funded in Mandatory unit cost based on historical prototyping data LI 0954 - Medium Unmanned Surface Vehicle (MUSVs) Navy UNCLASSIFIED Page 4 of 7 P-1 Line #27 Volume 1 - 522 === page 601 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 12 O O C Cost Elements 1.1.1) Vessel Procurement (†) (†) FY 2027 (2) Contractor and Location TBD (3) / TBD P-1 Line Item Number / Title: 0954 / Medium Unmanned Surface Vehicle (MUSVs) Method/Type or Funding Vehicle C / FFP Location of PCO Award Date Date of First Delivery NAVSEA Nov 2026 Sep 2027 Item Number / Title [DODIC]: 1 / Medium Unmanned Surface Vehicle (MUSVs) Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) 2 35,498K RFP Issue Date Y indicates the presence of a P-21 Footnotes: (2) (3) No vendor information is available at this time. Currently reviewing contractor Areas of Interest submissions and selecting vendors. Dates and vendors are based on initial procurement estimates and will be updated based on awards LI 0954 - Medium Unmanned Surface Vehicle (MUSVs) Navy UNCLASSIFIED Page 5 of 7 P-1 Line #27 Volume 1 - 523 === page 602 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0954 / Medium Unmanned Surface Vehicle (MUSVs) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 12 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Vessel Procurement 1 2027 PROC QTY NAVY Item Number / Title [DODIC]: 1 / Medium Unmanned Surface Vehicle (MUSVs) Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) 2 0 2 A O C T N O V D E C J A N LI 0954 - Medium Unmanned Surface Vehicle (MUSVs) Navy F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 7 2 S E P 0 P-1 Line #27 Volume 1 - 524 === page 603 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0954 / Medium Unmanned Surface Vehicle (MUSVs) Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 12 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: 1 / Medium Unmanned Surface Vehicle (MUSVs) Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 TBD (3) - TBD MSR For 2027 1-8-5 For 2027 MAX For 2027 1 2 20 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 10 Total After Oct 1 ALT Prior to Oct 1 10 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 10 10 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (3) Dates and vendors are based on initial procurement estimates and will be updated based on awards LI 0954 - Medium Unmanned Surface Vehicle (MUSVs) Navy UNCLASSIFIED Page 7 of 7 P-1 Line #27 Volume 1 - 525 === page 604 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 526 === page 605 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 12: Small Boats ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1210 / Standard Boats Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 1,306.265 1,306.265 1,306.265 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 82.086 97.746 0.000 97.746 66.058 74.111 79.273 447.298 447.298 447.298 - - - - - - - 82.086 97.746 0.000 97.746 66.058 74.111 79.273 - - - - - - - 82.086 97.746 0.000 97.746 66.058 74.111 79.273 To FY 2031 Complete 78.667 Continuing - Continuing - 78.667 Continuing - Total - Continuing - - 78.667 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Naval Sea Systems Command (NAVSEA) -- Boats are procured to fill allowances established by CNO and NAVSEA and to replace boats now in service which are beyond economical repair at shore activities and aboard ships. Total inventory objectives change based on Fleet requirements. H0001 BASE OPERATING FORCES Force Protection Boat (Small) - Light gasoline twin outboard engine powered (up to 150 HP each) aluminum boats from 7 to 8.2 meters (24 to 27 ft) in length used primarily for fleet force protection, maritime interdiction, law enforcement operations, at Naval activities and adjacent ports and waterways duties. Can operate in areas where the environment (sea states/climatology) does not present a significant challenge. Service life is 7 years. CNIC Force Protection Boat (Small) - Gasoline twin outboard engine aluminum boats approximately 8.5 meters (27 ft) in length with a narrow beam to aid in transport. Used primarily for fleet security, force protection/anti-terrorism, maritime interdiction and law enforcement operations at Naval activities and adjacent ports and waterways. The boats are provided with shouldering capabilities and foundations suitable for weapons. The boats operate primarily at Naval activities in sheltered harbors and waterways. Service life is 7 years. CNIC Force Protection Boat (Medium) - Gasoline outboard engine powered aluminum boats approximately 10 meters (33 ft) in length used primarily for fleet force protection, maritime interdiction, law enforcement operations at Naval activities and adjacent ports and waterways duties. Needed for operations in areas where the environment (sea states/climatology) is significant enough to necessitate the larger boat and resultant larger engines to meet the performance/operational requirements. Service life is 7 years. CNIC Force Protection Boat (Large) - Gasoline twin outboard engine powered aluminum boats approximately 11 meters (36 ft) in length with a wide beam used primarily for fleet force protection, maritime interdiction, law enforcement operations, at Naval activities and adjacent ports and waterways duties. Needed in areas where the environment (sea states/climatology) necessitates a larger boat for dependability. Service life is 7 years. CNIC Workboat (Medium) - Diesel inboard-engine powered steel boats up to approximately 11 meters (36 ft) in length used primarily for multi-purpose workboat applications at Naval activities and adjacent ports and waterways duties, such as towing and pusher boat capabilities, line handling, harbor cleaning, and security barrier tending. Habitability, maneuverability and bollard pull power are commensurate LI 1210 - Standard Boats Navy UNCLASSIFIED Page 1 of 18 P-1 Line #28 Volume 1 - 527 === page 606 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 12: Small Boats ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1210 / Standard Boats Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A with operational requirements associated with barrier and moderately sized vessel assist (i.e., barges, boats, etc.). The Workboat (Medium) is capable of performing operations in areas where the operating environment (sea states/climatology) is not significant enough to necessitate the larger boat, but includes the capabilities necessary to meet operational requirements. Service life is 20 years. CNIC Workboat (Large) - Diesel inboard-engine powered steel boats over approximately 11 meters (36 ft) in length used primarily for multi-purpose workboat applications at Naval activities and adjacent ports and waterways. Duties include towing and pusher tugboat capabilities, diver support, ship's husbandry, cargo carrier, personnel ferry, harbor cleaning, firefighting and security barrier tending. Habitability, maneuverability and bollard pull power are commensurate with operational requirements associated with large sized vessel assist (i.e., ships, derricks, etc.). The Workboat (Large) is needed for operations in areas where the operating environment (including sea states/climatology) is significant enough to necessitate the larger boat and include the capabilities necessary to meet operational requirements. Service life is 25 years. Arizona Memorial Ferry - The primary mission requirement for the Arizona Memorial ferry boats is to provide safe, reliable shuttle service between the Visitors Center and the Arizona Memorial. Secondary missions for the ferry boats include an average of one round trip per day for re-enlistment ceremonies, one or two round trips per day for additional Navy tours (special events, holiday ceremonies, harbor lights tours, etc.) and normal daily transit to and from stowage. Ferry service is provided 362 days per year. Utility Boats - 25 ft boats used for OSR operations, working in conjunction with Boom Platforms (BPs) and Rapid Response Skimmers (RRS). Typical mission requires UB and BP to sprint to the oil spill location ahead of the RRS. After spill assessment, 24" response boom (aboard BP) is tied off to UB, which is used to payout/deploy boom to surround spill while the RRS recovers the oil. UB crew tends boom during oil skimming operations, accessing boom over low gunwales or via dive door on UB. Typical mission duration is 3-8 hours. Service life is 10 years. H0002 AMPHIBIOUS ASSAULT SHIPS 7M (24 ft) Rigid Inflatable Boat (RIB) - Diesel powered, primarily used as ship's lifeboats, search and rescue boats, liberty boats, and for general transportation on auxiliaries, combatants, carriers, amphibious, and shore activities. Also used for Anti-Terrorism/Force Protection (AT/FP) and Maritime Interdiction Operation/Vessel, Boarding, Search and Seizure (MIO/VBSS) operations. Service life is 12 years. 11M (36 ft) RIB - Carried as a ship's boat or assigned to a shore activity to perform a variety of operations including personnel and light cargo transfer, anchorage administration AT/FP operations and swimmer defense, visit/boarding/search and maritime interdiction, Amphibious Assault Vehicle (AAV) safety boat and Advanced Amphibious Assault Vehicle (AAAV) assist boat. Service life is 12 years. H0003 EXPLOSIVE ORDNANCE DISPOSAL FORCES Explosive Ordnance Disposal (EOD) Support Craft RIB - Used for area search, MK 5 and MK 16 Underwater Breathing Apparatus (UBA)/diving training, mammal operations, ordnance/mine recovery, parachute insertion support and command and control. Service life is 10 years. 11M (36 ft) EOD RIB - The 11M RIBs are required to support the emergent establishment of an enduring MK 18 unmanned underwater vehicle family of systems capability for near term operational missions in the shallow water and very shallow water environments in the Fifth Fleet area of responsibility. Operational missions include intelligence preparation of the operational environment/mine countermeasure missions. Service life is 7 to 10 years. H0004 NAVAL SPECIAL WARFARE (NSW) NSW Short Range Support Craft - Used in support of combat swimmer-diver training evolutions and the Special Warfare Combatant Craft (SWCC) basic crewman training curriculum. Service life is 10 years. NSW Long Range Support Craft - SEAL combat swimmer/SEAL Delivery Vehicle (SDV)/surface swimmer safety craft for offshore/open ocean training support. Provides transportation to/from training areas, dive supervisor/event officer-in-charge/corpsman safety support platform and injured diver/swimmer egress platform for Naval Special Warfare. Service life is 10 years. LI 1210 - Standard Boats Navy UNCLASSIFIED Page 2 of 18 P-1 Line #28 Volume 1 - 528 === page 607 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 12: Small Boats ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1210 / Standard Boats Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A NSW RIB (formerly Enhanced Visit Board Search and Seizure (VBSS)) - Provide operational commander a capability to conduct VBSS and Maritime Interception Operations (MIO) from an Afloat Staging Base in conjunction with an overwatch craft and other friendly forces. Service life is 7 years. H0005 RIVERINE ACTIVITIES 40 Patrol Boat (40PB) - The craft will support maritime security operation missions and tasks such as harbor approach defense; high value unit transit escort operations; VBSS operations and overwatch; critical infrastructure protection; amphibious operations support; riverine operations; mine warfare support; embarked forces support (e.g., Special Operations Forces (SOF), EOD, United States Coast Guard (USCG) Law Enforcement Detachment (LEDET); and, Humanitarian Assistance/Disaster Relief (HA/DR) support. Twin diesel engine powered boat with a nominal length of 40 ft used to patrol green water littoral zones such as coastal water approaches, bays, major rivers, ports, and harbors. Service life is 15 to 20 years. Coastal Riverine Force (CRF) Boat Simulator - Funding will be used to procure integrated virtual training simulators. These virtual simulators will provide training for MK VI and 40PB coxswains, navigators, engineers, and weapons personnel. Riverine Multi-Mission Craft - Provides the Navy with, but not limited to, high value unit Escort, maritime infrastructure protection; coastal riverine security; VBSS, VBSS overwatch and/or mine warfare support. Service life is 8 years. MK VI Patrol Boat - Naval Expeditionary Combat Command (NECC) Riverine Forces require a tactically sized, highly reliable, combatant craft capable of operating from land or maritime platforms. The mission of the MK VI is to provide the operational commander a capability to persistently patrol shallow littoral areas beyond sheltered harbors and bays, and into less sheltered open water out to the Departure Sea Area (DSA) for the purpose of force protection of friendly and coalition forces and critical infrastructure. Mission profiles may include: patrol of Maritime Pre-positioning Force (MPF) and Joint Logistics Over the Shore (JLOTS) anchorage and marshaling areas, offshore economic infrastructure Gulf Oil Platforms (GOPLATs), High-Value Asset (HVA) shipping escort, over watch of MIO/VBSS operations, Theater Security Cooperation (TSC), and Security Force Assistance (SFA). Service life is 7 to 10 years. H0006 SUPPORT FORCES 7M (24 ft) RIB - Diesel powered, primarily used as ship's lifeboats, search and rescue boats, liberty boats, and for general transportation on auxiliaries, combatants, carriers, amphibious, and shore activities. Also used for AT/FP and MIO/VBSS operations. Service life is 12 years. H0007 FLEET LOGISTICS SUPPORT 7M (24 ft) RIB - Diesel powered, primarily used as ship's lifeboats, search and rescue boats, liberty boats, and for general transportation on auxiliaries, combatants, carriers, amphibious, and shore activities. Also used for AT/FP and MIO/VBSS operations. Service life is 12 years. H0008 NAVAL COASTAL WARFARE Patrol Boat (Small) - Light gasoline twin outboard engine powered (up to 150 HP each) aluminum boats from 7 to 8.2 meters (24 to 27 ft) in length used primarily for fleet force protection, maritime interdiction, law enforcement operations, at Naval activities and adjacent ports and waterways duties. Can operate in areas where the environment (sea states/climatology) does not present a significant challenge. Service life is 7 years. Patrol Boat (Large) - Twin diesel engine powered aluminum boats over 9 meters (30 ft) in length used primarily for fleet force protection, maritime interdiction, law enforcement operations, at Naval activities and adjacent ports and waterways duties. Needed in areas where the environment (sea states/climatology) necessitates a larger boat for dependability. Too heavy to meet the performance/operational requirements with outboard engines. Service life is 7 years. LI 1210 - Standard Boats Navy UNCLASSIFIED Page 3 of 18 P-1 Line #28 Volume 1 - 529 === page 608 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 12: Small Boats ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1210 / Standard Boats Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A H0009 SUBMARINE WARFARE Dive Boat Replacement - Aluminum hull from 50 to 60 ft boat used in operations involving diving or the need to deploy support equipment at or near the water. Examples include dive operations focusing on underwater ships husbandry of Fleet assets, training, underwater survey and RDT&E, as well as, general ports and waterways operations, routine harbor maintenance and cleanup duties, and to assist in patrol, rescue, firefighting and picket operations. Service life: 15 to 20 years. Range Support Craft - Workboat type vessel to serve US Navy Weapons Systems Training and Validation, assisting fleet operations conducting acoustical, thermal and cross-section measurements and testing. Hulls to be steel or aluminum with aluminum superstructure and corrosion resistant systems, components and hardware to operate in industrial conditions with minimal maintenance. Sea kindliness underway and while loitering for extended periods are among the primary operational requirements. A large open workspace on the after deck with a retrieval ramp providing access to the water and appropriate weapons handling machinery. Weapons systems equipment to be handled includes missiles, torpedoes, surface and air launched Remotely Operated Vehicles (ROVs) and targets. Minimal freeboard height aft is necessary for crew safety while accessing and operating the weapons retrieval mechanism without compromising stability. The boat must be able to accommodate extreme loading conditions (i.e., from a full weapons load topside to light load). The boat must be as stable and as wide as possible to provide the inherent stability characteristics necessary to perform the operations and necessary to provide ergonomics for the crew and passengers. Requirements include communications, navigation and other electronics systems necessary to support the sophisticated training, validation and recording of specialized measurements to support a wide variety of operations. A Commercial Off The Shelf (COTS) boat built to recognize commercial standards can accomplish specific operational requirements for the mission. Service Life is 25 years. H0010 POLLUTION CONTROL EQUIPMENT Oil Boom Platform - 30 ft Boom Platform (BP) Boat used for Oil Spill Response (OSR) operations, working in conjunction with 25 ft Utility Boats (UBs) and Rapid Response Skimmers (RRS). Typical mission requires UB and BP to sprint to the oil spill location ahead of the RRS. After spill assessment, 24" response boom (aboard BP) is tied off to UB, which is used to payout/deploy boom to surround spill while the RRS recovers the oil. BP crew delivers and unravels the boom during oil skimming operations. Typical mission duration is 3-8 hours. Service life is 10 years. Utility Boats - 25 ft boats used for OSR operations, working in conjunction with Boom Platforms (BPs) and Rapid Response Skimmers (RRS). Typical mission requires UB and BP to sprint to the oil spill location ahead of the RRS. After spill assessment, 24" response boom (aboard BP) is tied off to UB, which is used to payout/deploy boom to surround spill while the RRS recovers the oil. UB crew tends boom during oil skimming operations, accessing boom over low gunwales or via dive door on UB. Typical mission duration is 3-8 hours. Service life is 10 years. Rapid Response Skimmers - 30 ft boats used for OSR operations, working in conjunction with Boom Platforms (BPs) and Utility Boats (UBs). Typical mission requires UB and BP to sprint to the oil spill location ahead of the RRS. After spill assessment, 24" response boom (aboard BP) is tied off to UB, which is used to payout/deploy boom to surround spill while the RRS recovers the oil. The RRS "skims" the oil off of the top of the water and holds it in an onboard storage container for proper disposal and processing. Typical mission duration is 3-24 hours. Service life is 10 years. H0011 WARFARE INTEGRATION Workboat (Medium) - Diesel inboard-engine powered steel boats up to approximately 11 meters (36 ft) in length used primarily for multi-purpose workboat applications at Naval activities and adjacent ports and waterways duties, such as towing and pusher boat capabilities, line handling, harbor cleaning, and security barrier tending. Habitability, maneuverability and bollard pull power are commensurate with operational requirements associated with barrier and moderately sized vessel assist (i.e., barges, boats, etc.). The Workboat (Medium) is capable of performing operations in areas where the operating environment (sea states/climatology) is not significant enough to necessitate the larger boat, but includes the capabilities necessary to meet operational requirements. Service life is 20 years. H0012 TRAINING ACTIVITIES 11M (36 ft) RIB - Carried as a ship's boat or assigned to a shore activity to perform a variety of operations including personnel and light cargo transfer, anchorage administration AT/FP operations and swimmer defense, visit/boarding/search and maritime interdiction, Amphibious Assault Vehicle (AAV) safety boat and Advanced Amphibious Assault Vehicle (AAAV) assist boat. Service life is 12 years. LI 1210 - Standard Boats Navy UNCLASSIFIED Page 4 of 18 P-1 Line #28 Volume 1 - 530 === page 609 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 12: Small Boats ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1210 / Standard Boats Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A CNIC Force Protection Boat (Medium) - Gasoline outboard engine powered aluminum boats approximately 10 meters (33 ft) in length used primarily for fleet force protection, maritime interdiction, law enforcement operations at Naval activities and adjacent ports and waterways duties. Needed for operations in areas where the environment (sea states/climatology) is significant enough to necessitate the larger boat and resultant larger engines to meet the performance/operational requirements. Service life is 7 years. Naval Diving Salvage Training Command (NDSTC) Utility Boat - Used for training EOD technicians, Joint Service and Fleet Operators in support of area search, MK 5 and MK 16 Underwater Breathing Apparatus (UBA)/diving training, mammal operations, ordnance/mine recovery, parachute insertion support and command and control. Service life is 10 years. H0830 PRODUCTION ENGINEERING Production Engineering funds are used for engineering and technical support of boat and combatant craft acquisition and the development of integrated logistics support documentation to include technical data packages, provisioning, technical manuals, preventative maintenance documents and naval training systems plans. Technical support shall include acceptance trials, test and evaluation, inspections of production facilities, methods and quality assurance procedures and processes during and after construction. Additionally, official Navy boat inventory management, pre-delivery and post-delivery inspections and preparing documentation regarding boat and combatant craft procurement contract closeout and may be accomplished. Boats will not be safe or suitable to perform Navy boat and combatant craft missions if acquisition engineering technical support and integrated logistics support are not funded and completed. Boats will not be properly accounted for in accordance with the Department of Navy's instruction 4780.6G if boat inventory management is not provided. H0CA5 DIVE BOATS Aluminum hull from 50 to 60 ft boat used in operations involving diving or the need to deploy support equipment at or near the water. Examples include dive operations focusing on underwater ships husbandry of Fleet assets, training, underwater survey and RDT&E, as well as, general ports and waterways operations, routine harbor maintenance and cleanup duties, and to assist in patrol, rescue, firefighting and picket operations. Service life: 15 to 20 years. H0CA6 RANGE SUPPORT CRAFT Workboat type vessel to serve US Navy Weapons Systems Training and Validation, assisting fleet operations conducting acoustical, thermal and cross-section measurements and testing. Hulls to be steel or aluminum with aluminum superstructure and corrosion resistant systems, components and hardware to operate in industrial conditions with minimal maintenance. Sea kindliness underway and while loitering for extended periods are among the primary operational requirements. A large open workspace on the after deck with a retrieval ramp providing access to the water and appropriate weapons handling machinery. Weapons systems equipment to be handled includes missiles, torpedoes, surface and air launched Remotely Operated Vehicles (ROVs) and targets. Minimal freeboard height aft is necessary for crew safety while accessing and operating the weapons retrieval mechanism without compromising stability. The boat must be able to accommodate extreme loading conditions (i.e., from a full weapons load topside to light load). The boat must be as stable and as wide as possible to provide the inherent stability characteristics necessary to perform the operations and necessary to provide ergonomics for the crew and passengers. Requirements include communications, navigation and other electronics systems necessary to support the sophisticated training, validation and recording of specialized measurements to support a wide variety of operations. A Commercial Off The Shelf (COTS) boat built to recognize commercial standards can accomplish specific operational requirements for the mission. Service Life is 25 years. H0CA7 40PB (formerly Patrol Boat (X)) The craft will support maritime security operation missions and tasks such as harbor approach defense; high value unit transit escort operations; VBSS operations and overwatch; critical infrastructure protection; amphibious operations support; riverine operations; mine warfare support; embarked forces support (e.g., Special Operations Forces (SOF), EOD, United States Coast Guard (USCG) Law Enforcement Detachment (LEDET); and, Humanitarian Assistance/Disaster Relief (HA/DR) support. Twin diesel engine powered boat with a nominal length of 40 ft used to patrol green water littoral zones such as coastal water approaches, bays, major rivers, ports, and harbors. Service life is 15 to 20 years. H0CA8 DIESEL FUEL OUTBOARDS LI 1210 - Standard Boats Navy UNCLASSIFIED Page 5 of 18 P-1 Line #28 Volume 1 - 531 === page 610 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 12: Small Boats ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1210 / Standard Boats Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A The Diesel Fuel Outboard Motor project supports the transition of the FY 2015 Rapid Innovation Fund "Affordable Multi-fuel Multi-engine Advanced Combatant Craft" program to the Explosive Ordnance Disposal Force. This technology minimizes the types of fuel required to increase standardization, flexibility, and interoperability during deployment while at the same time reduces total ownership cost. This technology is being transitioned to the Fleet by being installed aboard Explosive Ordnance Disposal Force Craft currently operating as well as for new procurements in the future. H0CA9 MK VI Patrol Boat MK VI Patrol Boat - Naval Expeditionary Combat Command (NECC) Riverine Forces require a tactically sized, highly reliable, combatant craft capable of operating from land or maritime platforms. The mission of the MK VI is to provide the operational commander a capability to persistently patrol shallow littoral areas beyond sheltered harbors and bays, and into less sheltered open water out to the Departure Sea Area (DSA) for the purpose of force protection of friendly and coalition forces and critical infrastructure. Mission profiles may include: patrol of Maritime Pre-positioning Force (MPF) and Joint Logistics Over the Shore (JLOTS) anchorage and marshaling areas, offshore economic infrastructure Gulf Oil Platforms (GOPLATs), High-Value Asset (HVA) shipping escort, over watch of MIO/VBSS operations, Theater Security Cooperation (TSC), and Security Force Assistance (SFA). Service life is 7 to 10 years. H0CAB FORCE PROTECTION BOAT (SMALL) Light gasoline twin outboard engine powered (up to 150 HP each) aluminum boats from 7 to 8.2 meters (24 to 27 ft) in length used primarily for fleet force protection, maritime interdiction, law enforcement operations, at Naval activities and adjacent ports and waterways duties. Can operate in areas where the environment (sea states/climatology) does not present a significant challenge. Service life is 7 years. H0G86 OCO SUPPLEMENTAL Current existing systems require replacements for boats due to excessive wear and tear. The boats are being maintained; however, they are not designed for the operational tempo (OPTEMPO) and harsh operating conditions in which they will be employed. The Force Protection Coastal (FPC) boats will provide capability called for in Visit, Board, Search and Seizure (VBSS) overwatch Urgent Operational Needs Statement (UONS) that cannot be met with existing boats. The Riverine Patrol boats, 7M EOD RIBS, and Force Protection (Large) are for boats already in theater. Coastal Riverine Force (CRF) 40PB - The craft will support maritime security operation missions and tasks such as Harbor Approach Defense; high value unit transit escort operations; VBSS operations and overwatch; critical infrastructure protection; amphibious operations support; riverine operations; mine warfare support; Embarked Forces Support (e.g., SOF, EOD, USCG LEDET); and, Humanitarian Assistance/ Disaster Relief (HA/DR) Support. Twin diesel engine powered boat with a nominal length of 40 ft used to patrol green water littoral zones such as coastal water approaches, bays, major rivers, ports, and harbors. Service life is 15 to 20 years. This begins the reset of twenty-four (24) over age and deteriorating patrol boats continuously deployed to CENTCOM in support of Operation Freedom's Sentinel - Theater (OFS-T). The craft are needed to maintain operational capability and readiness to support force protection and Intelligence, Surveillance and Reconnaissance (ISR) missions in CENTCOM for OFS-T. Rigid Inflatable Boats (RIB) ISO Global Mine Warfare (MIW) Operations - OCO funding to support the purchase of one (1) 8.5M Rigid Inflatable Boat (RIB) to replace the Combat Rubber Rating Crafts (CRRCs) currently being utilized for global Unmanned Underwater Vehicle (UUV) inshore surveys. The larger RIBs are required due to the CRRCs not being designed for offshore use thus unsafe/unreliable in offshore maritime conditions, and severely limit maneuverability through most sea-states which is unsuitable for the majority of UUV surveys. RIBs are designed for offshore UUV survey requests. The RHIBs will greatly improve the ability to provide mission critical information aimed at protecting the Navy from underwater threats and support the increased naval demand in offshore operations. The project is in geographic area for MIW operations in support of a USCENTCOM requirement ("SPARTAN SHIELD"/FTN # 1190C066396) UKRAINE PRESIDENTIAL DRAWDOWN AUTHORITY (PDA) HSMST (HIGH SPEED MANEUVERABLE SURFACE TARGET) - Ukraine Presidential Drawdown Authority (PDA) funds to procure Anti-Submarine Warfare (ASW) range support equipment that includes selfpropelled surface targets, towed surface targets, and associated target augmentation to mimic threats and/or provide feedback. Self-propelled surface targets include the High Speed Maneuverable Surface Target (HSMST). Provides the user with a medium to high speed remote controlled surface target with a high degree of maneuverability. It has a form fitted collar surrounding the deck area of the aluminum hull. This target can exceed 45 knots in a calm sea and approaches 40 knots in a sea state 3. LI 1210 - Standard Boats Navy UNCLASSIFIED Page 6 of 18 P-1 Line #28 Volume 1 - 532 === page 611 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 12: Small Boats ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1210 / Standard Boats Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A 40PB - Ukraine PDA funds. The craft will support maritime security operation missions and tasks such as harbor approach defense; high value unit transit escort operations; VBSS operations and overwatch; critical infrastructure protection; amphibious operations support; riverine operations; mine warfare support; embarked forces support (e.g., Special Operations Forces (SOF), EOD, United States Coast Guard (USCG) Law Enforcement Detachment (LEDET); and, Humanitarian Assistance/Disaster Relief (HA/DR) support. Twin diesel engine powered boat with a nominal length of 40 ft used to patrol green water littoral zones such as coastal water approaches, bays, major rivers, ports, and harbors. Service life is 15 to 20 years. Unmanned Vessels - Ukraine PDA funds. Unmanned Surface Vessel Medium and Large - Used in support of Unmanned Surface Vessel testing and demonstration at the Naval Surface Warfare Center, Carderock Division - Combatant Craft Division's Autonomy Lab & Integration Center (ALICe) to support Research and Development of Autonomous Capability for Unmanned Surface Vessels. Provides space for payloads for experimentation of autonomy for both harbor and offshore/open ocean environments. Service life is 10 years. 7M (24 ft) RIB - Ukraine PDA funds. Diesel powered, primarily used as ship's lifeboats, search and rescue boats, liberty boats, and for general transportation on auxiliaries, combatants, carriers, amphibious, and shore activities. Also used for AT/FP and MIO/VBSS operations. Service life is 12 years. 11M (36 ft) RIB - Ukraine PDA funds. Carried as a ship's boat or assigned to a shore activity to perform a variety of operations including personnel and light cargo transfer, anchorage administration AT/FP operations and swimmer defense, visit/boarding/search and maritime interdiction, Amphibious Assault Vehicle (AAV) safety boat and Advanced Amphibious Assault Vehicle (AAAV) assist boat. Service life is 12 years. CNIC Force Protection Boat (Small) - Ukraine PDA funds. Gasoline twin outboard engine aluminum boats approximately 8.5 meters (27 ft) in length with a narrow beam to aid in transport. Used primarily for fleet security, force protection/anti-terrorism, maritime interdiction and law enforcement operations at Naval activities and adjacent ports and waterways. The boats are provided with shouldering capabilities and foundations suitable for weapons. The boats operate primarily at Naval activities in sheltered harbors and waterways. Service life is 7 years. SSPBV BLOCKING VESSELS Blocking Vessels - 250 ft Off Shore Vessels (OSVs) also referred to as Blocking Vessels (BVs) operating at each Strategic Weapons Facility (Bangor, Washington and Kings Bay, Georgia). The Blocking Vessels are a key security component in the transit of SSBNs to and from the dive point. Service Life is 25 years. H0014 - SMALL UNMANNED SURFACE VEHICLES (sUSV) FAMILY OF SYSTEMS The sUSV Portfolio consists of a family of systems designed to meet an urgent Geographic Combatant Command Requirement. sUSV: Platform 1 is an unmanned vehicle that requires a high bandwidth datalink to operate at long distances. Additionally, the platform will be equipped with a radar, infrared devices, and will be capable of carrying various payloads. The platform will be delivered with an autonomy ready package, high-definition surveillance cameras, and remote command and control capabilities. The Navy has an emergent need to operate sUSVs with autonomous software while operating at long distances. The Navy has defined the emergent need to operate and refine tactics with the sUSVs. The FY 2026 spend plan for 1210 Standard Boats includes $5,100 thousand of discretionary funding and $82,086 thousand of mandatory funding for a total of $87,186 thousand. The mandatory funds support the procurement of NAVSCIOTTS craft. sUSV Next (Platform 2+): sUSV Next consists of a combination of sUSVs that will be used to conduct Naval operations to meet an urgent Geographic Combatant Command Requirement. sUSV Next is a production-ready, inexpensive Maritime capability leveraging the best of commercial technology and innovations at speed and scale. A single sUSV consists of a USV, a communications system, a command and control (C2) station, the procurement and integration of autonomy software, and a payload that will be integrated once the USV is delivered. LI 1210 - Standard Boats Navy UNCLASSIFIED Page 7 of 18 P-1 Line #28 Volume 1 - 533 === page 612 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 12: Small Boats ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1210 / Standard Boats Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Starting in FY 2027, funds were moved to LI 0956 - Small Unmanned Surface Vehicles. RRL FORCE PROTECTION Ready, Relevant Learning (RRL) is a transformational Navy training initiative designed to accelerate the learning of every Sailor for faster response to our rapidly changing warfighting requirements and to achieve higher performance by coupling the timing of training delivery with every Sailor's actual deck plate needs. RRL is developing a continuum-of-learning by offering the right training at the right time so that our Sailors are ready to operate their equipment at the extreme technical end of its capability to win the high-end fight. RRL is transforming outdated training content and archaic methodology into a modernized, on demand, Fleet-responsive learning system. Modernized training delivery is producing more efficient and effective training by leveraging new technologies and training support via several MyNavy HR initiatives including: MyNavy Career Center, My Navy Portal, Learning Stack, and Authoritative Data Environment. Multi-Use EOD Response Craft The boats are stripped down version of the Multi-Use EOD (Explosive Ordnance Disposal) response craft (MERC) in support of RRL training. The MERC is a highly versatile small boat designed for rapid deployment and response to explosive threats in maritime environments. Equipped with advanced EOD tools and technology, it enables precise operations, including detection, neutralization, and disposal of underwater and surface explosives, ensuring the safety and security of naval and civilian vessels. Service Life is 15 Years. The FY 2026 spend plan for 1210 Standard Boats includes $5,100 thousand of discretionary funding and $82,086 thousand of mandatory funding for a total of $87,186 thousand. The mandatory funds support the procurement of NAVSCIOTTS craft. LI 1210 - Standard Boats Navy UNCLASSIFIED Page 8 of 18 P-1 Line #28 Volume 1 - 534 === page 613 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 12: Small Boats ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1210 / Standard Boats Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Standard Boats P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 1,306.265 - / 447.298 - / 82.086 - / 97.746 - / 1,306.265 - / 447.298 - / 82.086 - / 97.746 - / - - / 97.746 / 0.000 - / 97.746 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2026 spend plan for 1210 Standard Boats includes $82,086 thousand of discretionary funding and $5,100 thousand of mandatory funding for a total of $87,186 thousand. The mandatory funds support the procurement of NAVSCIOTTS craft. LI 1210 - Standard Boats Navy UNCLASSIFIED Page 9 of 18 P-1 Line #28 Volume 1 - 535 === page 614 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1210 / Standard Boats Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 12 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Standard Boats Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) H0001 - Base Operating Forces 1.1) Force Protection Small A 1.2) CNIC Force A (†) Protection (Small) 1.3) CNIC Force Protection (Medium) A 1.4) CNIC Force A (1)(†) (†) Protection (Large) 1.5) CNIC Workboat (Medium) (†) A 1.6) CNIC Workboat (Large) A 1.7) Arizona Memorial A Ferry (2)(†) 1.8) Utility Boats (3)(†) A Subtotal: 1) H0001 - Base Operating Forces 3,387K 3 10.161 439,625.00 32 508,231.40 - - - - - - - - - - - - - - 14.068 484,666.67 11 5.331 - - - - - - - - - - - - 121 61.496 - - - 20 11.520 - - - 20 11.520 3,193K 14 44.706 1,001K 5 5.005 - - - - - - - - - 1,008K 45 45.368 1,094K 3 3.281 1,116K 1.138 - - - 1,138K 1,691K 20 33.814 - - - - - - - - - - 2,000K - - - - - - 168,000.00 - - - - 13.617 209.613 - 565,111.11 - 6 3.391 576,000.00 - 576,000.00 - - 2.231 1,138K - - - - - - - - - - 1 2.000 - - - - - - - - - 1 0.168 171,000.00 0.342 - - - 13.000 - - - 2 - - 7.790 - 1 2 - 1 171,000.00 - 2 - 1.138 0.342 13.000 2) H0002 - Amphibious Assault Ships 2.1) 7M (24 ft) Rigid Inflatable Boat (RIB) (†) (†) 2.2) 11M (36 ft) RIB A A Subtotal: 2) H0002 - Amphibious Assault Ships 240,607.14 28 6.737 346,750.00 4 1.387 353,727.27 11 3.891 361,000.00 9 3.249 - - - 361,000.00 9 3.249 966,208.33 24 23.189 1,173K 3 3.519 1,196K 3 3.588 1,220K 3 3.660 - - - 1,220K 3 3.660 - 29.926 - - 4.906 - 7.479 - 6.909 - - - - 587,292.93 99 58.142 866,722.22 24 20.801 884,000.00 7.216 - - - 1,255K 35 43.918 - - - - - - - - - - - - - - - - - 102.060 - - 20.801 - - 7.072 - - 7.216 - - - - - 7.216 358,679.49 78 27.977 397,333.33 10 3.973 405,333.33 10 4.053 413,000.00 9 3.717 - - - 413,000.00 9 3.717 423,042.86 70 29.613 395,117.65 34 13.434 403,000.00 8 3.224 411,125.00 8 3.289 - - - 411,125.00 8 3.289 1,021K 14 14.295 - - - - - - - - - 6.909 3) H0003 - Explosive Ordnance Forces 3.1) EOD Support A (†) Craft RIB (†) 3.2) 11M EOD RIB A Subtotal: 3) H0003 - Explosive Ordnance Forces 8 7.072 902,000.00 8 902,000.00 8 7.216 4) H0004 - Naval Special Warfare 4.1) NSW Long Range Support A (†) Craft 4.2) NSW Short Range Support A (†) Craft 4.4) NSW RIB A LI 1210 - Standard Boats Navy - - - - UNCLASSIFIED Page 10 of 18 - - - P-1 Line #28 - - - Volume 1 - 536 === page 615 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1210 / Standard Boats Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 12 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Subtotal: 4) H0004 - Naval Special Warfare FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) - - 71.885 - 2,890K 28 80.933 4,410K - - 9.886 - - - 1.100 FY 2026 Total Cost Qty (Each) Unit Cost ($ M) - Aggregated Items Title: Standard Boats ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) 17.407 - - 7.277 - 4.410 - - - 4,589K - 2.432 - - - - - - - - - - FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) - ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 7.006 - - - - - 7.006 13.766 - - - 4,589K - 0.308 - - - - - 0.308 - - - - - - - - - 5) H0005 - Riverine Activities 5.1) 40PB A (4)(†) 5.2) 40PB Production Support-LogisticsInventory Mgmt-GFESpares A 5.3) 40PB Spares/ Design rights A 5.4) CRF Boat Simulator A 5.5) Riverine MultiMission Craft A 5.6) MK VI Patrol Boat A Subtotal: 5) H0005 - Riverine Activities 1 3 3 13.766 3,000K 2 6.000 - - - - - - - - - - - - - - - 4,085K 11 44.936 - - - - - - - - - - - - - - - 8,217K 3 24.651 - - - - - - - - - - - - - - - - 167.506 - - 6.842 - - - - - 14.074 - - - - - 14.074 191 49.292 346,750.00 2.830 361,000.00 68 24.548 - - - 68 24.548 - 49.292 2.830 - 24.548 - - - - 24.548 36 9.806 347,000.00 0.722 - - - - - 9.806 - - 0.694 - - 0.707 - - 0.722 - - - - - 0.722 - - 0.681 - - - - - - - - - - - - - - - 3.680 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 6.287 4,500K 9.000 4,590K 1 4.590 - - - 4,590K 1 4.590 11,648K 1 11.648 - - - 11,648K 1 11.648 16.238 - - - - 6) H0006 - Support Forces 6.1) 7M (24 ft) RIB A (5)(†) 258,073.30 Subtotal: 6) H0006 - Support Forces - - 8 - 2.774 353,750.00 2.774 - 8 - - 361,000.00 - 7) H0007 - Fleet Logistics Support 7.1) 7M (24 ft) RIB (†) A 272,388.89 Subtotal: 7) H0007 - Fleet Logistics Support 2 0.694 353,500.00 2 0.707 361,000.00 2 361,000.00 2 0.722 8) H0008 - Naval Coastal Warfare 8.1) Reserve Patrol Boat Small A 8.2) Reserve Patrol Boat Large A Subtotal: 8) H0008 - Naval Coastal Warfare 1,227K 3 - - 4.361 - 2,143K 16 34.293 3,144K - - - - - - - - - - - 34.293 - - 6.287 - - 9.000 9) H0009 - Submarine Warfare 9.1) Dive Boat Replacement (†) 9.2) Range Support (†) A A Craft Subtotal: 9) H0009 - Submarine Warfare 2 2 - - - - 16.238 10) H0010 - Pollution Control Equipment LI 1210 - Standard Boats Navy UNCLASSIFIED Page 11 of 18 P-1 Line #28 Volume 1 - 537 === page 616 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1210 / Standard Boats Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 12 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 10.1) Oilboom A (†) MAIS Code Platform 10.2) Utility Boats A 10.3) Rapid Response A (†) Skimmer (†) 10.4) OSR OB Engine A Subtotal: 10) H0010 - Pollution Control Equipment Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Standard Boats Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 203,031.25 32 6.497 225,250.00 4 0.901 229,750.00 4 0.919 234,250.00 3 0.703 - - - 234,250.00 3 0.703 146,985.51 69 10.142 164,333.33 9 1.479 167,666.67 9 1.509 171,000.00 9 1.539 - - - 171,000.00 9 1.539 408,000.00 37 15.096 477,500.00 2 0.955 487,000.00 2 0.974 496,500.00 2 0.993 - - - 496,500.00 2 0.993 10,416.67 24 0.250 - - - - - - - - - - - - - - - - - 31.985 - - 3.335 - - 3.402 - - 3.235 - - - - - 3.235 1,031K 12 12.377 - - - - - - - - - - - - - - - - - 12.377 - - - - - - - - - - - - - - - 1.718 1,173K 1.173 1,196K 1.196 1,220K 1 1.220 - - - 1,220K 1 1.220 - - - - - - - 411,000.00 3 1.233 - - - 411,000.00 3 1.233 0.952 - - - - - - - - - - - - - - - 11) H0011 - Warfare Integration 11.1) Workboat (Medium) A Subtotal: 11) H0011 - Warfare Integration 12) H0012 - Training Activities 12.1) 11M (36ft) RIB A 12.3) NSW SHORT RANGE SUPPORT A (†) CRAFT (6)(†) 12.4) NDSTC Utility Boat A Subtotal: 12) H0012 - Training Activities 859,000.00 - 2 - 476,000.00 2 1 1 - - 2.670 - - 1.173 - - 1.196 - - 2.453 - - - - - 2.453 - - 12.346 - - 1.187 - - 4.424 - - 0.894 - - - - - 0.894 - - 0.391 - - - - - - - - - - - - - - - - - 12.737 - - 1.187 - - 4.424 - - 0.894 - - - - - 0.894 - - 9.046 - - 0.369 - - 0.369 - - 0.369 - - - - - 0.369 - - 0.289 - - - - - - - - - - - - - - - - - 9.335 - - 0.369 - - 0.369 - - 0.369 - - - - - 0.369 6.777 - - - - - - - - - - - - - - - 6.777 - - - - - - - - - - - - - - - 13) H0830 - Production Engineering 13.1) Production Engineering A 13.2) Production Engineering (Naval Coastal Warfare) A Subtotal: 13) H0830 - Production Engineering 14) H0900 - Consulting Services 14.1) Consulting Services A 14.2) Consulting Services (Naval Coastal Warfare) A Subtotal: 14) H0900 - Consulting Services 15) H0CA5 - Dive Boats 15.1) Dive Boats A Subtotal: 15) H0CA5 - Dive Boats 2,259K - 3 - 16) H0CA6 - Range Support Craft LI 1210 - Standard Boats Navy UNCLASSIFIED Page 12 of 18 P-1 Line #28 Volume 1 - 538 === page 617 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1210 / Standard Boats Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 12 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 16.1) Range Support Craft A MAIS Code Unit Cost ($) Qty (Each) - Unit Cost ($ M) 18,362K Subtotal: 16) H0CA6 - Range Support Craft FY 2025 Total Cost 2 - ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Standard Boats Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 36.723 - - - - - - - - - - - - - - - 36.723 - - - - - - - - - - - - - - - 17.890 4,410K 17.640 4,499K 26.994 - - - - - - - - - 17) H0CA7 - 40PB 17.1) 40PB A 17.2) 40PB Production SupportLogistics-Inventory Mgmt-GFE-Spares A (†) 3,578K Subtotal: 17) H0CA7 - 40PB 5 4 6 - - 2.110 - - 1.800 - - 3.546 - - - - - - - - - - - 20.000 - - 19.440 - - 30.540 - - - - - - - - - 156 18.300 - - - - - - - - - - - - - - - - - 2.000 - - - - - - - - - - - - - - - - - 20.300 - - - - - - - - - - - - - - - - - - - - 2.500 - - - - - - - - - - - - - - 0.000 - - 2.500 - - - - - - - - - - - - - - 2.000 - - - - - - - - - - - - - - - - - 9.979 - - - - - - - - - - - - - - - - - 11.979 - - - - - - - - - - - - - - - 18) H0CA8 - Diesel Fuel Outboards 18.1) Diesel Fuel Outboards Upgrades A 18.2) Diesel Fuel Outboard Motor Testing / Integration A 117,307.69 Subtotal: 18) H0CA8 - Diesel Fuel Outboards 19) H0CA9 - MK VI Patrol Boats 19.1) MKVI Patrol Boats Support A Subtotal: 19) H0CA9 - MK VI Patrol Boats 20) H0CAB - Force Protection Boat (Small) 20.1) Force Protection Boat (Small) A 20.2) Small Escort Vessels (33') A Subtotal: 20) H0CAB - Force Protection Boat (Small) 21) H0G86 - OCO 21.1) OCO - Patrol Boat (Large) (Reserve) A 21.2) OCO - RIBS A 21.3) OCO - 7M EOD RIBs (Reserve) A 21.4) OCO - Force Protection - Coastal (Reserve) A 21.5) Coastal Riverine Force (CRF) - 40PB A LI 1210 - Standard Boats Navy 651,000.00 2 1.302 - - - - - - - - - - - - - - - 500,000.00 2 1.000 - - - - - - - - - - - - - - - 234,000.00 6 1.404 - - - - - - - - - - - - - - - 4,000K 5 20.000 - - - - - - - - - - - - - - - 2,502K 22 55.050 - - - - - - - - - - - - - - - UNCLASSIFIED Page 13 of 18 P-1 Line #28 Volume 1 - 539 === page 618 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1210 / Standard Boats Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 12 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 21.6) 40PB Production SupportLogistics-Inventory Mgmt-GFE-Spares A 21.7) RIB - Global Mine A MAIS Code Unit Cost ($) - Subtotal: 21) H0G86 - OCO FY 2025 Total Cost Qty (Each) Unit Cost ($ M) - ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Standard Boats Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 0.414 - - - - - - - - - - - - - - - 0.476 - - - - - - - - - - - - - - - - 79.646 - - - - - - - - - - - - - - - 3,440K 18 61.920 - - - - - - - - - - - - - - - - - 2.938 - - - - - - - - - - - - - - - 476,000.00 - 1 22) Ukraine Presidential Drawdown Authority (PDA) 22.1) 40PB A 22.2) 40PB Production SupportLogistics-Inventory Mgmt-GFE-Spares A 22.3) Targets A 22.4) Unmanned Vessels A (†) 22.5) CNIC Force A (†) Protection (Small) 22.6) 7M (24 ft) Rigid Inflatable Boat (RIB) (†) 22.7) 11M (36 ft) A A (†) RIB Subtotal: 22) Ukraine Presidential Drawdown Authority (PDA) 253,333.33 15 3.800 - - - - - - - - - - - - - - - 4,425K 2 8.850 - - - - - - - - - - - - - - - - - - 485,000.00 14 6.790 - - - - - - - - - - - - - - - 346,714.29 7 2.427 - - - - - - - - - - - - - - - 1,173K 13 15.249 - - - - - - - - - - - - - - 77.508 - - 24.466 - - - - - - - - - - - - 23) SSPBV 23.1) Blocking Vessels A Subtotal: 23) SSPBV 38,230K 152.920 - - - - - - - - - - - - - - - - - 4 152.920 - - - - - - - - - - - - - - - 24) H0014 - sUSV Family of Systems 24.1) sUSV Platforms A - - 130.602 - - 232.697 - - - - - - - - - - - - 24.2) Payloads A - - 16.600 - - 64.668 - - - - - - - - - - - - 24.3) C2 Stations A - - 0.972 - - 6.466 - - - - - - - - - - - - 24.4) Spare Kits A - - 0.715 - - 4.895 - - - - - - - - - - - - 24.5) Production Engineering A - - 3.677 - - 12.774 - - - - - - - - - - - - - - 152.566 - - 321.500 - - - - - - - - - - - - - - - - - - - - - 1.082 - - - - - 0.000 - - - - - - 1.082 - - - Subtotal: 24) H0014 - sUSV Family of Systems 25) RRL Force Protection 25.1) Multi-Use EOD Response Crafts (†) A Subtotal: 25) RRL Force Protection LI 1210 - Standard Boats Navy UNCLASSIFIED Page 14 of 18 541,000.00 - 2 - P-1 Line #28 541,000.00 - 2 - 1.082 1.082 Volume 1 - 540 === page 619 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1210 / Standard Boats Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 12 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost Total ($) - Qty (Each) - FY 2025 Total Cost ($ M) 1,306.265 Unit Cost ($) - Qty (Each) - FY 2026 Total Cost ($ M) 447.298 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) Aggregated Items Title: Standard Boats Unit Cost ($) - Qty (Each) FY 2027 Base Total Cost ($ M) - 82.086 Unit Cost ($) - Qty (Each) - FY 2027 OOC Total Cost ($ M) Unit Cost ($) 97.746 - Qty (Each) - FY 2027 Total Total Cost Unit Cost ($ M) ($) - - Qty (Each) - Total Cost ($ M) 97.746 indicates the presence of a P-5a Footnotes: (1) (2) (3) (4) (5) (6) The increase in quantity is to replace the backlog of craft that are beyond economical repair and are past their established service life. The increase in quantity is to replace the backlog of craft that are beyond economical repair and are past their established service life. The increase in quantity is to replace the backlog of craft that are beyond economical repair and are past their established service life. The increase in quantity is to replace the backlog of craft that are beyond economical repair and are past their established service life. The increase in quantity is to replace the backlog of craft that are beyond economical repair and are past their established service life. The increase in quantity is to replace the backlog of craft that are beyond economical repair and are past their established service life. LI 1210 - Standard Boats Navy UNCLASSIFIED Page 15 of 18 P-1 Line #28 Volume 1 - 541 === page 620 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 12 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 1210 / Standard Boats Aggregated Items: Standard Boats FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) 2025 MetalCraft / Watertown, NY C / IDIQ NAVSEA Nov 2024 Mar 2026 11 484,666.67 N 2026 TBD / TBD C / IDIQ NAVSEA Jun 2026 Jan 2027 6 565,111.11 N 2027 TBD / TBD C / IDIQ NAVSEA Jun 2027 Jan 2028 20 576,000.00 N Qty (Each) RFP Issue Date 1) H0001 - Base Operating Forces 1.2) CNIC Force Protection (Small) 1.3) CNIC Force Protection (Medium) (1) 1.3) CNIC Force Protection (Medium) (1) 1.4) CNIC Force Protection (Large) 2025 MetalCraft / Watertown, NY C / IDIQ NAVSEA Nov 2024 Apr 2026 5 1,001K N 1.5) CNIC Workboat (Medium) 2025 Snow & Company / Seattle, WA C / IDIQ NAVSEA Mar 2025 Mar 2026 3 1,094K N 1.5) CNIC Workboat (Medium) 2026 TBD / TBD C / IDIQ NAVSEA Jun 2026 Apr 2027 2 1,116K N 1.5) CNIC Workboat (Medium) 2027 TBD / TBD C / IDIQ NAVSEA Jun 2027 Apr 2028 1 1,138K N (2) 2026 TBD / TBD C / IDIQ NAVSEA Jun 2026 Jun 2027 1 2,000K N 1.8) Utility Boats (3) 2026 TBD / TBD C / IDIQ NAVSEA Jun 2026 May 2027 1 168,000.00 N 1.8) Utility Boats (3) 2027 TBD / TBD C / IDIQ NAVSEA Jun 2027 Jun 2027 2 171,000.00 N 2.1) 7M (24 ft) Rigid Inflatable Boat (RIB) 2025 Zodiac / Stevensville, MD C / IDIQ NAVSEA Dec 2024 Oct 2025 4 346,750.00 N 2.1) 7M (24 ft) Rigid Inflatable Boat (RIB) 2026 TBD / TBD C / IDIQ NAVSEA Jun 2026 Jan 2027 11 353,727.27 N 2.1) 7M (24 ft) Rigid Inflatable Boat (RIB) 2027 TBD / TBD C / IDIQ NAVSEA Jun 2027 Jan 2028 9 361,000.00 N 2.2) 11M (36 ft) RIB 2025 RIBCRAFT / Marblehead, MA C / IDIQ NAVSEA Jul 2025 Mar 2027 3 1,173K N 2.2) 11M (36 ft) RIB 2026 TBD / TBD C / IDIQ NAVSEA Jun 2026 Mar 2027 3 1,196K N 2.2) 11M (36 ft) RIB 2027 TBD / TBD C / IDIQ NAVSEA Jun 2027 Mar 2028 3 1,220K N 3.1) EOD Support Craft RIB 2025 USMI / Gulfport, MS C / IDIQ NAVSEA Mar 2025 Mar 2026 24 866,722.22 N 3.1) EOD Support Craft RIB 2026 USMI / Gulfport, MS C / IDIQ NAVSEA Dec 2025 Dec 2026 8 884,000.00 N 3.1) EOD Support Craft RIB 2027 TBD / TBD C / IDIQ NAVSEA Jun 2027 Apr 2028 8 902,000.00 N 3.2) 11M EOD RIB 2023 RIBCRAFT / Marblehead, MA C / IDIQ NAVSEA Sep 2023 May 2026 4 1,518K N 4.1) NSW Long Range Support Craft 2025 Silverships / Theodore, AL C / IDIQ NAVSEA Feb 2025 Feb 2026 10 397,333.33 N 4.1) NSW Long Range Support Craft 2026 Silverships / Theodore, AL C / IDIQ NAVSEA Jan 2026 Jan 2027 10 405,333.33 N 4.1) NSW Long Range Support Craft 2027 TBD / TBD C / IDIQ NAVSEA Jun 2027 Dec 2027 9 413,000.00 N 1.7) Arizona Memorial Ferry 2) H0002 - Amphibious Assault Ships 3) H0003 - Explosive Ordnance Forces 4) H0004 - Naval Special Warfare LI 1210 - Standard Boats Navy UNCLASSIFIED Page 16 of 18 P-1 Line #28 Volume 1 - 542 === page 621 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 12 Aggregated Items: Standard Boats FY Contractor and Location Method/Type or Funding Vehicle 4.2) NSW Short Range Support Craft 2025 Silverships / Theodore, AL C / IDIQ NAVSEA Feb 2025 Feb 2026 34 395,117.65 N 4.2) NSW Short Range Support Craft 2026 Silverships / Theodore, AL C / IDIQ NAVSEA Jan 2026 Jan 2027 8 403,000.00 N 4.2) NSW Short Range Support Craft 2027 TBD / TBD C / IDIQ NAVSEA Jun 2027 Jan 2028 8 411,125.00 N Apr 2023 Apr 2026 3 3,440K N Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 1210 / Standard Boats Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 5) H0005 - Riverine Activities 5.1) 40PB (4) 2022 ReconCraft / Anchorage, AL C / IDIQ NAVSEA 5.1) 40PB (4) 2023 ReconCraft / Anchorage, AL C / IDIQ NAVSEA Apr 2023 May 2026 2 3,578K N 5.1) 40PB (4) 2025 ReconCraft / Anchorage, AL C / IDIQ NAVSEA Jun 2025 Mar 2027 1 4,410K N 5.1) 40PB (4) 2027 TBD / TBD C / IDIQ NAVSEA Jun 2027 May 2028 3 4,589K N 6) H0006 - Support Forces 6.1) 7M (24 ft) RIB (5) 2025 RIBCRAFT / Marblehead, MA C / IDIQ NAVSEA Jun 2025 Jul 2026 8 346,750.00 N 6.1) 7M (24 ft) RIB (5) 2026 TBD / TBD C / IDIQ NAVSEA Jun 2026 Jan 2027 8 353,750.00 N 6.1) 7M (24 ft) RIB (5) 2027 TBD / TBD C / IDIQ NAVSEA Jun 2027 Jan 2028 68 361,000.00 N 7.1) 7M (24 ft) RIB 2025 RIBCRAFT / Marblehead, MA C / IDIQ NAVSEA Jun 2025 Jul 2026 2 347,000.00 N 7.1) 7M (24 ft) RIB 2026 TBD / TBD C / IDIQ NAVSEA Jun 2026 Jan 2027 2 353,500.00 N 7.1) 7M (24 ft) RIB 2027 TBD / TBD C / IDIQ NAVSEA Jun 2027 Jan 2028 2 361,000.00 N 7) H0007 - Fleet Logistics Support 9) H0009 - Submarine Warfare 9.1) Dive Boat Replacement 2023 Fraser Shipyards / Superior, WI C / FFP NAVSEA Jun 2023 Nov 2025 1 3,021K N 9.1) Dive Boat Replacement 2025 St. Johns Shipbuilding / Palatka, FL C / FFP NAVSEA May 2025 Dec 2026 2 3,144K N 9.1) Dive Boat Replacement 2026 TBD / TBD C / IDIQ NAVSEA Jun 2026 Jun 2027 2 4,500K N 9.1) Dive Boat Replacement 2027 TBD / TBD C / IDIQ NAVSEA Jun 2027 Jun 2028 1 4,590K N 9.2) Range Support Craft 2027 TBD / TBD C / FFP NAVSEA Jun 2027 Sep 2028 1 11,648K N 10.1) Oilboom Platform 2025 MetalCraft / Watertown, NY C / IDIQ NAVSEA Dec 2024 Nov 2025 4 225,250.00 N 10.1) Oilboom Platform 2026 MetalCraft / Watertown, NY C / IDIQ NAVSEA Jan 2026 Dec 2026 4 229,750.00 N 10.1) Oilboom Platform 2027 TBD / TBD C / IDIQ NAVSEA Jun 2027 May 2028 3 234,250.00 N 10.2) Utility Boats 2025 MetalCraft / Watertown, NY C / IDIQ NAVSEA Dec 2024 Aug 2026 9 164,333.33 N 10.2) Utility Boats 2026 MetalCraft / Watertown, NY C / IDIQ NAVSEA Jan 2026 Dec 2026 9 167,666.67 N 10.2) Utility Boats 2027 TBD / TBD C / IDIQ NAVSEA Jun 2027 May 2028 9 171,000.00 N 10.3) Rapid Response Skimmer 2025 Lake Assault Boats / Superior, WI C / IDIQ NAVSEA Nov 2024 Nov 2025 2 477,500.00 N 10) H0010 - Pollution Control Equipment LI 1210 - Standard Boats Navy UNCLASSIFIED Page 17 of 18 P-1 Line #28 Volume 1 - 543 === page 622 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 12 Aggregated Items: Standard Boats FY Contractor and Location Method/Type or Funding Vehicle 10.3) Rapid Response Skimmer 2026 Lake Assault Boats / Superior, WI C / IDIQ NAVSEA Jan 2026 Jan 2027 2 487,000.00 N 10.3) Rapid Response Skimmer 2027 TBD / TBD C / IDIQ NAVSEA Jun 2027 Dec 2027 2 496,500.00 N 12.1) 11M (36ft) RIB 2025 RIBCRAFT / Marblehead, MA C / IDIQ NAVSEA Jul 2025 Sep 2026 1 1,173K N 12.1) 11M (36ft) RIB 2026 TBD / TBD C / IDIQ NAVSEA Jun 2026 Mar 2027 1 1,196K N 12.1) 11M (36ft) RIB 2027 TBD / TBD C / IDIQ NAVSEA Jun 2027 Mar 2028 1 1,220K N 2027 TBD / TBD C / IDIQ NAVSEA Jun 2027 Apr 2028 3 411,000.00 N 2023 Gravois Aluminum Boats / Jeanerette, LA C / IDIQ NAVSEA May 2024 Aug 2026 5 3,578K N 2025 Gravois Aluminum Boats / Jeanerette, LA C / IDIQ NAVSEA Jun 2025 Sep 2026 4 4,410K N 2026 TBD / TBD C / IDIQ NAVSEA Jun 2026 Aug 2027 6 4,499K N Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 1210 / Standard Boats Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 12) H0012 - Training Activities 12.3) NSW SHORT RANGE SUPPORT CRAFT (6) 17) H0CA7 - 40PB 17.1) 40PB 17.1) 40PB 17.1) 40PB 22) Ukraine Presidential Drawdown Authority (PDA) 22.1) 40PB 2022 ReconCraft / Anchorage, AL C / IDIQ NAVSEA Apr 2023 Oct 2025 18 3,440K N 22.5) CNIC Force Protection (Small) 2025 MetalCraft / Watertown, NY C / IDIQ NAVSEA Apr 2025 Apr 2026 14 485,000.00 N 22.6) 7M (24 ft) Rigid Inflatable Boat (RIB) 2025 RIBCRAFT / Marblehead, MA C / IDIQ NAVSEA Jun 2025 Apr 2026 7 346,714.29 N 22.7) 11M (36 ft) RIB 2025 RIBCRAFT / Marblehead, MA C / IDIQ NAVSEA Jul 2025 Jul 2026 13 1,173K N 2027 TBD / NAVSEA C / IDIQ NAVSEA Jun 2027 Apr 2028 2 541,000.00 N 25) RRL Force Protection 25.1) Multi-Use EOD Response Crafts LI 1210 - Standard Boats Navy UNCLASSIFIED Page 18 of 18 P-1 Line #28 Volume 1 - 544 === page 623 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 14: Production Facilities Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1445 / Operating Forces IPE Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 1,544.832 1,544.832 1,544.832 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 209.304 209.304 209.304 394.998 394.998 394.998 492.100 - 0.000 - 492.100 - 0.000 - 492.100 0.000 492.100 492.100 492.100 196.985 196.985 196.985 264.408 264.408 264.408 306.076 306.076 306.076 To FY 2031 Complete 292.112 Continuing 292.112 - Total - Continuing Continuing Continuing - - 292.112 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Operating Forces Industrial Plant Equipment (IPE) budget provides funding for capital equipment procurement in support of naval shipyards and Fleet I-level maintenance activities. These investments deliver modern, innovative equipment essential for maintaining submarines, aircraft carriers, and surface ships; and reducing dependence on outdated IPE, weight handling systems, and nuclear support infrastructure. By modernizing equipment infrastructure, these procurements enhance maintenance productivity and throughput, reduce costly rework, and help maintain cost and schedule performance across submarine, aircraft carrier, and surface ship availabilities. The Capital Investment Program (CIP), a component of the Shipyard Infrastructure Optimization Program (SIOP), supports capital equipment modernization efforts at the four public naval shipyards and their detachments. This includes support for Virginia-Class repairs at Norfolk Naval Shipyard (NNSY), Portsmouth Naval Shipyard (PNSY), Puget Sound Naval Shipyard (PSNS & IMF), and Pearl Harbor Naval Shipyard (PHNSY & IMF). CIP includes providing equipment and machinery to increase the capacity of the Navy shipyards to maintain Virgina-class submarines and Ford-class carriers. Additionally, the Fleet Maintenance Investment Program (FMIP) funds capital equipment replacement and modernization at the U.S. Navy's regional maintenance centers and their detachments. Cost Code KN443 supports the Enterprise Remote Monitoring (eRM) system. eRM is the Navy's Condition Based Maintenance Plus (CBM+) Program of Record supporting Distance Support, Sea Power 21, Ship Maintenance (SHIPMAIN), CBM and CBM + initiatives. It is a Commercial Off-The-Shelf (COTS) based system that reduces Total Ownership Costs (TOC), maintenance and operating costs of monitored equipment by ensuring maintenance is accomplished based upon evidence of need. Condition Based Maintenance Plus (CBM+) is a maintenance optimization program that can generate significant benefits through maintenance program resets, maintenance effectiveness reviews, and active reliability centered maintenance (RCM) strategies at the program level. Employed as an enduring cross-life-cycle maintenance strategy, the program offers a technical solution to reduce maintenance burdens, increase operational availability and mission reliability of monitored systems, assists with identifying enterprise-wide cost avoidance, and will reduce overall life cycle costs. The Integrated Condition Assessment System (ICAS) hardware and software aboard Surface Fleet hulls (FY25 and prior Cost Codes KN800 and KN900) transitioned into the FY26 and out eRM program cited above. The FY 2026 spend plan amount for Other Procurement, Navy includes $394,998 thousand of discretionary and $390,600 thousand of mandatory (reconciliation) for a total of $785,598. LI 1445 - Operating Forces IPE Navy UNCLASSIFIED Page 1 of 18 P-1 Line #29 Volume 1 - 545 === page 624 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 14: Production Facilities Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1445 / Operating Forces IPE Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / KN200: NAVY MARITIME MAINTENANCE ENTERPRISE SOLUTION SUSTAINMENT]: This funding supports the Navy Maritime Maintenance Enterprise Solution (NMMES), a strategic information technology investment that has standardized NAVSEA and Fleet ship maintenance functions ashore, controlling and managing all aspects of ship maintenance at the Naval Shipyards, Regional Maintenance Centers (RMCs), and Ship Repair Facilities. Depot and Intermediate Level maintenance business processes to schedule, execute, monitor, certify work, and pay employees at aircraft carrier, submarine, and ship maintenance activities are codified within the NMMES toolset. Additionally, NMMES is utilized to manage finance, supply, shop workflow, configuration management, environmental health & safety, quality assurance, up-line management reporting and other functions. NMMES standardizes and institutionalizes the Navy's ship and submarine maintenance business practice processes. These processes are fully embedded in the NMMES IT systems to gain efficiencies in the maintenance process. NMMES systems provide the functionality and processes to continually address the maintenance needs of the Fleet, and have a critical role in the efficient brokering, planning, material ordering, financial performance, and execution of shore maintenance. This sustainment funding will support procurement of commercial-off-theshelf (COTS) hardware and software in support of NMMES IT applications. [P40A / KN300: SHIPYARD CAPITAL INVESTMENT PROGRAM (CIP)]: This line provides funding for the SIOP Capital Investment Program (CIP) in support of the consolidated Naval Shipyard and Intermediate Maintenance Facilities (IMF) requirements at the four Naval Shipyards. Funds will be used for the procurement and execution of Class 3 & 4 plant and personal property projects to maintain, modernize and improve the infrastructure and industrial base at the Naval Shipyard/IMF activities. Funding will allow for the acquisition of equipment and procurement related to Automated Data Processing (ADP) Hardware/ Software necessary to perform the mission of repairing, conversion, and modernization of fleet ships and submarines in the most economical, efficient, environmentally sound and safe manner possible. Continued reliance on an aged capital equipment infrastructure increases submarine and aircraft carrier depot maintenance availability costs and places schedules at risk. Budget year equipment requirements provided in this exhibit are based on current Shipyard priorities to best improve submarine and aircraft carrier availability execution within currently projected budget. [P40A / 175 TON HEAVY LIFT PORTAL CRANE]: Portsmouth Naval Shipyard's (PNSY) acquisition of a 175-ton heavy lift portal crane under the Shipyard Infrastructure Optimization Program (SIOP) recapitalizes an aging asset that is in poor material condition, has exceeded its expected service life, and faces increasing challenges due to parts obsolescence. This new crane is essential to support criticalpath weight-handling operations during submarine and aircraft carrier (CVN) nuclear defueling evolutions, tasks that cannot be performed by the shipyard's remaining lower-capacity portal cranes. It will also fulfill a broad range of depot-level maintenance lifting and handling requirements. [P40A / REACTOR SERVICING COMPLEX]: Reactor Servicing Complexes (RSC), previously referred to as the Refueling Complexes, allow the Shipyards to support the Fleet's projected need for simultaneous Virginia Class depot level maintenance availabilities and concurrent 688 Class Refuelings. FY25 provided funding for the dock-side Reactor Access Enclosure (RAE) for the RSC at Portsmouth Naval Shipyard. FY26 provided funding for additional equipment within the Servicing Complex. Providing RSCs at Dry Docks is required to support the Shipyard's mission of submarine overhauls and refuelings into the future. The RSC is a freestanding piece of relocatable equipment that processes spent nuclear fuel. This equipment allows fuel to be safely removed from a submarine and packaged for transportation to a storage facility, via M-140 railcar. The in-dock equipment performs the reactor servicing operation of processing spent nuclear fuel from the submarine into a shielded container. The in-dock complex industrial processing equipment includes two support towers, a reactor access enclosure (RAE) bridge, an upper RAE, and passageways leading from the in-dock complex to the dockside passageway stair tower. The dockside equipment performs the reactor servicing operation of processing spent nuclear fuel from a shielded container into three M-140 railcars. The dockside complex industrial processing equipment typically includes a dockside railcar enclosure, an equipment storage/staging enclosure, a radiological material packaging enclosure, and an enclosed passageway and stair tower leading to the in-dock complex. Both the dockside complex and in-dock complex equipment require concrete foundations to safely support equipment operation. The foundations required for the dockside complex do not structurally change existing real property. The foundation is part of the necessary relocatable equipment because of the size, mass and function of the equipment. [P40A / CONGRESSIONAL ADD - SUBMARINE SEISMIC CRADLES]: This Seismic Cradle Stability project is required to comply with NAVSEA 08 dry dock seismic requirements. In the event of a seismic event, the system will prevent the docked vessel from rolling over in the dry dock, thus significantly reducing the risk of ship damage and injury to personnel. FY24 funds cradle requirement at Puget Sound Naval Shipyard. [P40A / CONGRESSIONAL ADD - OILY WASTE TREATMENT SYSTEM]: This project replaces an aged Oily Waste Treatment System at Puget Sound Naval Shipyard. This system is designed to remove oil and other containminants from wastewater produced by industrial and ship operations. The goal of this system is to ensure that the treated water meets environmental standards before being discharged or reused. LI 1445 - Operating Forces IPE Navy UNCLASSIFIED Page 2 of 18 P-1 Line #29 Volume 1 - 546 === page 625 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 14: Production Facilities Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1445 / Operating Forces IPE Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / INDUSTRY 4.0 CAPABILITIES ASSET VISIBILITY MANAGEMENT (NADACS)]: As part of a SIOP initiative this project implements industry proven solutions to connect equipment for digital manufacturing, increase throughput, quality, report on machine health. Provides hardware (HW) & upgrades drivers for capable equipment, enabling connectivity to accept data electronically versus punching it in at the terminal or using a thumb drive and report on equipment operating status/machine health. Reduces time to transfer machining directions for components from the design loft to the plant equipment, increases first time quality, repeatability, and equipment health metrics. Current Project Scope: 4 NSYs, 150 pieces of equipment total. Initial project funded by the FY24 program. FY26 programs will fund refreshment projects providing new technology to improve reliability and add additional performance by expanding the Asset Visibility System to other areas of the shipyard. [P40A / 60-TON CRANE SERVICE LIFE EXTENSION PROGRAM (SLEP)]: Service Life Extension Program (SLEP) will extend the lifespan of 5 existing 60-ton portal cranes at Norfolk Naval Shipyard (NNSY) and Puget Sound Naval Shipyard (PSNS & IMF). The SLEP involves a refurbishment process to replace aged parts with modern, more efficient parts and a certification process to ensure the portal cranes comply with current safety standards. The SLEPs provide performance and safety improvements at a lower cost than procuring new cranes. [P40A / NAVY FOUNDRY AND PROPELLER CENTER (NFPC) IPE]: These funds are earmarked for the Navy Foundry and Propeller Center (NFPC) under the Capital Investment Program (CIP) line to support NFPC as a field activity aligned to Naval Sea Systems Command (NAVSEA) and Program Executive Office, Strategic Submarines, (PEO SSBN) starting in FY27. This funding will support the procurement of industrial plant equipment to maintain, modernize and improve the infrastructure at NFPC to support Virginia- and Columbia-class submarine construction. [P40A / KN400: FLEET MAINTENANCE INVESTMENT PROGRAM]: Provides funding to support capital investments for the Regional Maintenance Centers (RMCs) including forward deployed RMCs; Trident Refit Facility, Kings Bay (TRF KB); Naval Submarine Support Facility, New London (NSSF NL); Navy Base Guam; and U.S. Naval Ship Repair Facility and Japan Regional Maintenance Center (SRF-JRMC). Funds will be used for the procurement and execution of personal property projects (including Industrial Plant Equipment greater than $350K) to maintain and modernize the ship maintenance industrial base). [P40A / KN443: Condition Based Maintenance (CBM+ NAVSEA)]: Funds are provided to install integrated digital Condition Based Maintenance (CBM+) / Mission Readiness Systems aboard Navy Combatants. [P40A / KN44A: Condition Based Maintenance (CBM+ NAVAIR)]: Funds are provided to install integrated digital Condition Based Maintenance (CBM+) / Mission Readiness Systems aboard Navy Combatants. [P40A / Condition Based Maintenance (CBM+) (N4)]: Funds are provided to install integrated digital Condition Based Maintenance (CBM+) / Mission Readiness Systems aboard Navy Combatants. [P40A / Condition Based Maintenance (CBM+) (N98)]: Funds are provided to install integrated digital Condition Based Maintenance (CBM+) / Mission Readiness Systems aboard Navy Combatants. [P40A / KN800: INTEGRATED CONDITION ASSESSMENT SYSTEM (ICAS) AND ENTERPRISE REMOTE MONITORING (eRM) NEW INSTALL]: Procures all new installations of the Integrated Condition Assessment System (ICAS) and Enterprise Remote Monitoring (eRM) hardware and software aboard Surface Fleet hulls. New Installation include: ICAS/eRM workstation hardware (including Palm Pilot Portable Data Terminal (PDTs)), latest version of ICAS/eRM system software, Configuration Data Set (CDS) (including the implementation of developed enhancements), firewall (if applicable), remote monitoring utility (RMU), ILS and ship's force training. Manage contractor efforts, prepare installation plans, perform ship checks, procure material, oversee shipboard installation and Quality Assurance (QA), develop/implement CDS, install/test all software and CDSs, provide ship's force training. [P40A / KN900: INTEGRATED CONDITION ASSESSMENT SYSTEM (ICAS) AND ENTERPRISE REMOTE MONITORING (eRM) TECH REFRESH]: Procures all technical refresh upgrades of the Integrated Condition Assessment System (ICAS) and Enterprise Remote Monitoring (eRM) hardware and software aboard Surface Fleet hulls. Upgrades will include: ICAS/eRM workstation hardware (including Palm Pilot Portable Data Terminal (PDTs)), latest version of ICAS/eRM system software, Configuration Data Set (CDS) groom (including the implementation of developed enhancements), firewall (if applicable), remote monitoring utility (RMU), and ship's force refresher training. Manage contractor efforts, prepare installation plans, perform ship checks, procure material, oversee shipboard installation and Quality Assurance (QA), develop/implement CDS updates, install/test all software and CDSs, provide ship's force training. [P40A / KN975: PACOM PMTEC STUDIES]: Funds for Pacific Multi-Domain Training and Experimentation Capability (PMTEC) studies, Wargaming Analysis Capabilities, USINDOPACOM training and exercise network capabilities, PMTEC program management cell, and establishment of Exercise Experimentation Program and Joint Battle Problem. PMTEC is a joint initiative to integrate and improve elements of existing ranges, training areas and test facilities in the Pacific to provide a multi-domain test, training and experimentation capability. This capability will enable USINDOPACOM to strengthen the overall readiness and interoperability of U.S. forces across all domains and to test new warfighting concepts to improve joint force lethality. Live Fire Target Support, Joint Force Development and Design (JFDD) LI 1445 - Operating Forces IPE Navy UNCLASSIFIED Page 3 of 18 P-1 Line #29 Volume 1 - 547 === page 626 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 14: Production Facilities Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1445 / Operating Forces IPE Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Capability, Joint Deployable Exercise Control Cell (JDECC), Regional Joint Training Infrastructure and Theater Mobile Sensitive Compartmented Information Facility (SCIF). Build Defenses and Security Capability of Allies- Funding supports the continued Zero Trust (ZT) pilot for USINDOPACOM's Mission Partner Environment (MPE). LI 1445 - Operating Forces IPE Navy UNCLASSIFIED Page 4 of 18 P-1 Line #29 Volume 1 - 548 === page 627 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 14: Production Facilities Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1445 / Operating Forces IPE Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Operating Forces IPE P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 1,544.832 - / 209.304 - / 394.998 - / 492.100 - / 1,544.832 - / 209.304 - / 394.998 - / 492.100 - / - - / 492.100 / 0.000 - / 492.100 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY27 funding supports the following efforts: KN200 NMMES requires $5.64 million to support the replacement of the COST application using S4/HANA SAP software. COST is the critical application that provides standardized, current, and accurate cost accounting data for all Naval Sea Systems Command (NAVSEA) ship maintenance activities. The existing COST application has reached end-of-life, operates on obsolete software components, and is increasingly expensive to maintain. A full system replacement is necessary to resolve sustainability issues, enhance support for current and future ship maintenance requirements, and enable expanded capabilities. This modernization effort is being executed under a time-sensitive Other Transaction Authority (OTA) Production contract. The objective is to transition from the legacy COST system to a modern platform that improves sustainability, enhances interface capabilities, reduces operational costs, aligns with updated ship maintenance business processes, and meets evolving Department of War (DoW) standards. (Note: "COST" is the name of the application and is not an acronym or abbreviation). KN300 (CIP supporting SIOP) requires $170.868 million to support the procurement of capital equipment for naval shipyards and Fleet I-level maintenance activities. These investments enable the acquisition of modern, innovative equipment essential for maintaining submarines, aircraft carriers, and surface ships, reducing dependence on severely aged and obsolete industrial plant equipment (IPE), weight handling systems, and nuclear support infrastructure. Projects include, but are not limited to, the procurement of portal cranes, crawler cranes, mobile cranes, hydraulic test stands, pipe benders, plasma cutters, generators, bridge mills, and electronic security systems. The FY 2026 request for CIP included $134.356 million of discretionary funding, $186.0 million in the FY 2026 discretionary Congressional Add (labeled as CAKN3), and $273.0 million of mandatory funding for a total of $593.356 million. KN400 Fleet Maintenance Investment Program requires funding of $27.483 million for the procurement of industrial equipment to replace and modernize the ship maintenance and repair abilities at regional maintenance centers. Projects include boring mills, test stands, lathes, and laser ablation units. The FY 2026 request for CIP included $29.214 million of discretionary funding for theses purposes. KN443 Condition Based Maintenance (CBM+) requires funding of $12.292M focusing on Naval Sea Systems Command (NAVSEA) integration efforts. KN44A & KN44B Condition Based Maintenance (CBM+) requires funding of $2.993M focusing on Naval Air Systems Command (NAVAIR) integration efforts. KN975 PMTEC Studies requires $12.308 million to support efforts in the areas of warfare-gaming analysis and USINDOPACOM training and exercise network capabilities. LI 1445 - Operating Forces IPE Navy UNCLASSIFIED Page 5 of 18 P-1 Line #29 Volume 1 - 549 === page 628 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1445 / Operating Forces IPE Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 14 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Operating Forces IPE Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) 1) KN200: NAVY MARITIME MAINTENANCE ENTERPRISE SOLUTION SUSTAINMENT 1.1) NAVY MARITIME MAINTENANCE ENTERPRISE SOLUTION SUSTAINMENT A - - 67.011 - - 5.936 - - 6.049 - - 5.640 - - - - - 5.640 - - 67.011 - - 5.936 - - 6.049 - - 5.640 - - - - - 5.640 (1) Subtotal: 1) KN200: NAVY MARITIME MAINTENANCE ENTERPRISE SOLUTION SUSTAINMENT 2) KN201: NAVY MARITIME MAINTENANCE ENTERPRISE SOLUTION TECHNICAL REFRESH (NMMES-TR) 2.1) NAVY MARITIME MAINTENANCE ENTERPRISE SOLUTION TECHNICAL REFRESH A 1,221.000 Subtotal: 2) KN201: NAVY MARITIME MAINTENANCE ENTERPRISE SOLUTION TECHNICAL REFRESH (NMMES-TR) - 1 - 3) KN300: SHIPYARD CAPITAL INVESTMENT PROGRAM (CIP) 3.1) SHIPYARD CAPITAL INVESTMENT PROGRAM (CIP) A 3.2) 175 TON HEAVY LIFT PORTAL A CRANE - (3)(†) 3.3) PSNS RELOCATABLE WORK STRUCTURES A 3.4) REACTOR SERVICING A COMPLEX (†) 3.5) CONGRESSIONAL ADD - SUBMARINE SEISMIC - - - - - - - - - - - - - - - 1.221 - - - - - - - - - - - - - - - 945.067 - - - - - 42.133 - - 91.072 - - - - - 91.072 51.200 - - - (2) - 47,625.000 1.221 4 190.500 49,664.000 - - - - - - - 1 - 88,221.000 49.664 49,673.000 - 1 5,216.000 1 49.673 51,200.000 1 51,200.000 1 51.200 2 10.432 - - - - - - - - - 88.221 - - 19.854 - - - - - - - - - A 20,000.000 1 20.000 - - - - - - - - - - - - - - - 10,000.000 1 10.000 - - - - - - - - - - - - - - - 46.000 - - - - - 12.264 - - - - - - - - - (†) CRADLES 3.6) CONGRESSIONAL ADD - OILY WASTE TREATMENT A (†) SYSTEM 3.7) INDUSTRY 4.0 CAPABILITIES A - LI 1445 - Operating Forces IPE Navy - UNCLASSIFIED Page 6 of 18 P-1 Line #29 Volume 1 - 550 === page 629 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1445 / Operating Forces IPE Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 14 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 3.8) 60-TON CRANE SERVICE LIFE EXTENSION PROGRAM (SLEP) A 3.9) NAVY FOUNDRY AND PROPELLER CENTER (NFPC) IPE A ASSET VISIBILITY MANAGEMENT (NADACS) MAIS Code Subtotal: 3) KN300: SHIPYARD CAPITAL INVESTMENT PROGRAM (CIP) Unit Cost ($ K) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ K) ($ M) ($ K) Qty (Each) Unit Cost ($ M) ($ K) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) Qty (Each) Total Cost ($ M) - - - - - - - - - - 14.836 - - - - - 14.836 - - - - - - - - - - - 13.760 - - - - - 13.760 - - - - - - 134.356 - - 170.868 - - - - - 170.868 1,211.567 137.885 (4) A Subtotal: 4) CAKN3: SHIPYARD CAPITAL INVESTMENT PROGRAM (CIP) CONGRESSIONAL ADD - - - - - - - - 186.000 - - - - - - - - - - - 0.000 - - - - - 186.000 - - - - - - - - - 140.179 - - 15.199 - - 29.214 - - 27.483 - - - - - 27.483 14.275 - - - - - - - - - - - - 5) KN400: FLEET MAINTENANCE INVESTMENT PROGRAM 5.1) FLEET MAINTENANCE INVESTMENT PROGRAM A 5.2) POWDER COAT A (†) (Each) Unit Cost FY 2027 Base Total Cost - 4) CAKN3: SHIPYARD CAPITAL INVESTMENT PROGRAM (CIP) CONGRESSIONAL ADD 4.1) SHIPYARD CAPITAL INVESTMENT PROGRAM (CIP) CONGRESSIONAL ADD FY 2026 Total Cost Qty Aggregated Items Title: Operating Forces IPE SYSTEM Subtotal: 5) KN400: FLEET MAINTENANCE INVESTMENT PROGRAM - - - - - - 6) KN443: Condition Based Maintenance (CBM+ NAVSEA) 6.1) Condition Based Maintenance (CBM+) (N4 0708020N) A 6.2) Condition Based Maintenance (CBM+) (N4 0204228N) A 6.3) Condition Based Maintenance (CBM+) (N96) A Subtotal: 6) KN443: Condition Based Maintenance (CBM+ NAVSEA) (5) 140.179 14,275.000 1 - - 29.474 - - 29.214 - - 27.483 - - - - - 27.483 (6) - - - - - 1.600 - - 1.804 - - 1.704 - - - - - 1.704 - - - - - - - - 5.949 - - 10.578 - - - - - 10.578 - - - - - 6.899 - - 0.981 - - 0.010 - - - - - 0.010 - 0.000 - - 8.499 - - 8.734 - - 12.292 - - - - - 12.292 - 7) KN44A: Condition Based Maintenance (CBM+ NAVAIR) LI 1445 - Operating Forces IPE Navy (7) UNCLASSIFIED Page 7 of 18 P-1 Line #29 Volume 1 - 551 === page 630 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1445 / Operating Forces IPE Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 14 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 7.1) Condition Based Maintenance (CBM+) (N4) A MAIS Code Unit Cost ($ K) Subtotal: 7) KN44A: Condition Based Maintenance (CBM+ NAVAIR) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ K) Qty (Each) Aggregated Items Title: Operating Forces IPE FY 2026 Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) Qty (Each) Total Cost ($ M) - - - - - 1.100 - - 1.593 - - 1.457 - - - - - 1.457 - - 0.000 - - 1.100 - - 1.593 - - 1.457 - - - - - 1.457 - - - - - - - - 1.591 - - 1.536 - - - - - 1.536 - - 0.000 - - - - - 1.591 - - 1.536 - - - - - 1.536 - - 10.251 - - - - - - - - - - - - - - - - - 10.251 - - - - - - - - - - - - - - - - - 17.635 - - - - - - - - - - - - - - - - - 17.635 - - - - - - - - - - - - - - - 8) KN44B Condition Based Maintenance (CBM+) (N98) 8.1) Condition Based Maintenance (CBM+) (N98) A Subtotal: 8) KN44B Condition Based Maintenance (CBM+) (N98) 9) KN504: SRF-JRMC Capital Investment Program 9.1) SRF-JRMC Capital Investment Program A Subtotal: 9) KN504: SRF-JRMC Capital Investment Program 10) KN507: SRF-JRMC Capital Investment Program 10.1) SRF-JRMC Capital Investment Program A Subtotal: 10) KN507: SRF-JRMC Capital Investment Program 11) KN800: INTEGRATED CONDITION ASSESSMENT SYSTEM (ICAS) AND ENTERPRISE REMOTE MONITORING (eR 11.1) INTEGRATED CONDITION ASSESSMENT SYSTEM (ICAS) AND eRM A Subtotal: 11) KN800: INTEGRATED CONDITION ASSESSMENT SYSTEM (ICAS) AND ENTERPRISE REMOTE MONITORING (eR - - 54.598 - - 9.907 - - - - - - - - - - - - - - 54.598 - - 9.907 - - - - - - - - - - - - 12) KN900: INTEGRATED CONDITION ASSESSMENT SYSTEM (ICAS) AND ENTERPRISE REMOTE MONITORING (eR 12.1) INTEGRATED CONDITION ASSESSMENT SYSTEM (ICAS) AND eRM A Subtotal: 12) KN900: INTEGRATED CONDITION ASSESSMENT SYSTEM (ICAS) AND ENTERPRISE REMOTE MONITORING (eR - - 25.769 - - 1.771 - - - - - - - - - - - - - - 25.769 - - 1.771 - - - - - - - - - - - - 13) KN970:Information Dominance PACOM LI 1445 - Operating Forces IPE Navy UNCLASSIFIED Page 8 of 18 P-1 Line #29 Volume 1 - 552 === page 631 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1445 / Operating Forces IPE Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 14 Prior Years FY 2025 MDAP/ Item Number / Title [DODIC] ID CD 13.1) Coronavirus Aid, Relief and Economic Security PACOM A MAIS Code Unit Cost ($ K) Subtotal: 13) KN970:Information Dominance PACOM 14) KN975: PACOM PMTEC STUDIES 14.1) IPC MESH Network (9) 14.2) PMTEC Studies Total Cost Qty (Each) ($ M) ($ K) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) Qty (Each) Total Cost ($ M) - - 10.800 - - - - - - - - - - - - - - - - - 10.800 - - - - - - - - - - - - - - - - - - - - - - - - - - 42.814 - - - - - 42.814 - - 5.801 - - 14.732 - - 27.461 - - 12.308 - - - - - 12.308 - - 5.801 - - 14.732 - - 27.461 - - 55.122 - - - - - 55.122 (8) A A Subtotal: 14) KN975: PACOM PMTEC STUDIES 15) INDOPACOM - Special Operations Command Pacific (SOCPAC) 15.1) Theater MESH Unit Cost Aggregated Items Title: Operating Forces IPE A (10) - - - - - - - - - - - 78.522 - - - - - 78.522 - - - - - - - - - - - 139.180 - - - - - 139.180 Subtotal: 15) INDOPACOM - Special Operations Command Pacific (SOCPAC) - - 0.000 - - - - - - - - 217.702 - - - - - 217.702 Total - - 1,544.832 - - - - - - 492.100 - - - - - 492.100 Network (11) 15.2) SO Prepositioned Stocks A (12) 209.304 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) 394.998 indicates the presence of a P-5a Footnotes: (1) Supports procurement of commercial-off-the-shelf (COTS) hardware and software (HW/SW) in support of NMMES Financial Tool Upgrades, including Maritime Systems Environment (MSE) and the Electronic Technical Work Document (eTWD) initiative. Provides required development, test, and cybersecurity toolsets; SW/HW required to bring RMCs into eTWD. Provides HW required to deploy mobility solutions assets at maintenance activities with corporate reporting capability. Increase also supports efforts to establish networks for Platform IT devices and relevant industrial equipment to address cybersecurity updates, patches, and SW installation. (2) In FY 2026, mandatory funds in the amount of $273 million for "Navy depot and shipyard modernization" supported CIP as a part of the Shipyard Infrastructure Optimization Program (SIOP). These funds supported CIP in replacing and modernizing shipyard IPE. (3) (4) The quantities in FY 2026 and FY 2027 procure cranes for Portsmouth Naval Shipyard and completes the replacement of these cranes for all public naval shipyards. In FY 2026, discretionary funds in the amount of $186 million for "SIOP acceleration" added by Congress supported CIP as a part of the Shipyard Infrastructure Optimization Program (SIOP). These funds supported the procurement of new IPE and modernization of existing IPE. (5) (6) Funds will be used for the procurement and execution of personal property projects (including Industrial Plant Equipment greater than $350K) to maintain and modernize the ship maintenance industrial base. Condition Based Maintenance (CBM+) Enterprise Systems Shipboard Procurement and Installation]: Procures all new installations and technical refresh upgrades of the Integrated Condition Assessment System (ICAS) and Enterprise Remote Monitoring (eRM) hardware and software aboard Surface Fleet hulls. New Installation include: ICAS/eRM workstation hardware (including Palm Pilot Portable Data Terminal (PDTs)), latest version of ICAS/eRM system software, Configuration Data Set (CDS) (including the implementation of developed enhancements), firewall (if applicable), remote monitoring utility (RMU), ILS and ship's force training. Manage contractor efforts, prepare installation plans, perform ship checks, procure material, oversee shipboard installation and Quality Assurance (QA), develop/implement CDS, install/test all software and CDSs, provide ship's force training. (7) Condition Based Maintenance Plus (CBM+) is a maintenance optimization program that can generate significant benefits through maintenance program resets, maintenance effectiveness reviews, and active reliability centered maintenance (RCM) strategies at the program level. Employed as an enduring cross-life-cycle maintenance strategy, the program offers a technical solution to reduce maintenance burdens, increase operational availability and mission reliability of monitored systems, assists with identifying enterprise-wide cost avoidance, and will reduce overall life cycle costs. As a function of the Rapid Sustainment Improvement Process (RSIP), the CBM+ system will be installed on three LI 1445 - Operating Forces IPE Navy UNCLASSIFIED Page 9 of 18 P-1 Line #29 Volume 1 - 553 === page 632 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 14 P-1 Line Item Number / Title: 1445 / Operating Forces IPE Aggregated Items Title: Operating Forces IPE to five surface combatants for selected shipboard equipment. Sensors for these systems will be defined, procured and installed. Further, the CBM+ system will be integrated with the Naval Maintenance, Repair, and Overhaul (N-MRO) suite of programs onboard ship to facilitate on ship and off ship monitoring. (8) (9) Funding in FY27 return to historical levels to maintain support to USINDOPACOM's mission. This one-time increase to accelerate critical program in the Department's highest priority theater. This investment directly aligns with the Secretary of War's mandate to modernize the Joint Force for strategic competition. It will procure expand essential operational capabilities, buying down significant risk and ensuring our forces can deter and, if necessary, prevail. Additional details are available at the appropriate classification level. (10) (11) SOCPAC Prepositioned Stocks This one-time increase to accelerate critical program in the Department's highest priority theater. This investment directly aligns with the Secretary of War's mandate to modernize the Joint Force for strategic competition. It will procure expand essential operational capabilities, buying down significant risk and ensuring our forces can deter and, if necessary, prevail. Additional details are available at the appropriate classification level. (12) This one-time increase to accelerate critical program in the Department's highest priority theater. This investment directly aligns with the Secretary of War's mandate to modernize the Joint Force for strategic competition. It will procure expand essential operational capabilities, buying down significant risk and ensuring our forces can deter and, if necessary, prevail. Additional details are available at the appropriate classification level. LI 1445 - Operating Forces IPE Navy UNCLASSIFIED Page 10 of 18 P-1 Line #29 Volume 1 - 554 === page 633 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 14 Item Number / Title [DODIC] O O C FY P-1 Line Item Number / Title: 1445 / Operating Forces IPE Contractor and Location Method/Type or Funding Vehicle Aggregated Items: Operating Forces IPE Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date 3) KN300: SHIPYARD CAPITAL INVESTMENT PROGRAM (CIP) 3.2) 175 TON HEAVY LIFT 2020 Konecranes / New Berlin, WI C / FFP NAVFAC NCC Dec 2019 Mar 2025 1 46,500.000 Y 2021 Konecranes / New Berlin, WI C / FFP NAVFAC NCC May 2021 Nov 2025 1 47,000.000 Y 2022 Konecranes / New Berlin, WI C / FFP NAVFAC NCC Feb 2022 Aug 2025 1 48,000.000 Y 2023 Konecranes / New Berlin, WI C / FFP NAVFAC NCC Mar 2023 Sep 2026 1 49,000.000 Y 2025 Konecranes / New Berlin, WI C / FFP NAVFAC NCC Dec 2024 Dec 2027 1 49,664.000 Y 2026 Konecranes / New Berlin, WI C / FFP NAVFAC NCC Dec 2025 Dec 2028 1 49,673.000 Y 2027 Konecranes / New Berlin, WI C / FFP NAVFAC NCC Dec 2026 Dec 2029 1 51,200.000 Y 2025 TBD / TBD C / TBD NAVFAC Mar 2025 Mar 2027 1 88,221.000 Y Dec 2024 3.5) CONGRESSIONAL ADD SUBMARINE SEISMIC CRADLES 2024 ELECTRIC BOAT / Groton, CT C / TBD NAVSEA HQ Jul 2024 Jul 2025 1 20,000.000 Y Jun 2024 3.6) CONGRESSIONAL ADD - OILY WASTE TREATMENT SYSTEM 2024 NAVFAC NW / TBD C / TBD NAVFAC Northwest Aug 2024 Aug 2025 1 10,000.000 Y Jun 2024 Automatic Coating Limited / Canada C / FFP DLA Apr 2025 Apr 2027 1 14,275.000 Y PORTAL CRANE (3)(†) 3.2) 175 TON HEAVY LIFT PORTAL CRANE (3)(†) 3.2) 175 TON HEAVY LIFT PORTAL CRANE (3)(†) 3.2) 175 TON HEAVY LIFT PORTAL CRANE (3)(†) 3.2) 175 TON HEAVY LIFT PORTAL CRANE (3)(†) 3.2) 175 TON HEAVY LIFT PORTAL CRANE (3)(†) 3.2) 175 TON HEAVY LIFT PORTAL CRANE (3)(†) 3.4) REACTOR SERVICING (†) COMPLEX Oct 2025 5) KN400: FLEET MAINTENANCE INVESTMENT PROGRAM 5.2) POWDER COAT SYSTEM (†) 2025 indicates the presence of a P-21 LI 1445 - Operating Forces IPE Navy UNCLASSIFIED Page 11 of 18 P-1 Line #29 Volume 1 - 555 === page 634 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1445 / Operating Forces IPE Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 14 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Operating Forces IPE Fiscal Year 2020 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2019 1 OCT Calendar Year 2020 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2021 M A Y J U N J U L Calendar Year 2021 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 3) KN300: SHIPYARD CAPITAL INVESTMENT PROGRAM (CIP) 3.2) 175 TON HEAVY LIFT PORTAL CRANE (3) 3 2020 NAVY 1 0 1 3 2021 NAVY 1 0 1 A - - - - - - - - - - - - - - - - - - - - - - 1 A - - - - - 3 2022 NAVY 1 0 1 1 1 3 2023 NAVY 1 0 1 1 3 2025 NAVY 1 0 1 1 3 2026 NAVY 1 0 1 1 3 2027 NAVY 1 0 1 1 0 1 3.4) REACTOR SERVICING COMPLEX 4 2025 NAVY 1 1 O C T LI 1445 - Operating Forces IPE Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #29 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 556 === page 635 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1445 / Operating Forces IPE Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 14 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Operating Forces IPE Fiscal Year 2022 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 3) KN300: SHIPYARD CAPITAL INVESTMENT PROGRAM (CIP) 3.2) 175 TON HEAVY LIFT PORTAL CRANE (3) 3 2020 NAVY 1 0 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 3 2021 NAVY 1 0 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 3 2022 NAVY 1 0 1 A - - - - - - - - - - - - - - - - - - - - 1 3 2023 NAVY 1 0 1 A - - - - - - - 1 3 2025 NAVY 1 0 1 1 3 2026 NAVY 1 0 1 1 3 2027 NAVY 1 0 1 1 0 1 3.4) REACTOR SERVICING COMPLEX 4 2025 NAVY 1 1 O C T LI 1445 - Operating Forces IPE Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #29 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 557 === page 636 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1445 / Operating Forces IPE Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 14 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Operating Forces IPE Fiscal Year 2024 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 3) KN300: SHIPYARD CAPITAL INVESTMENT PROGRAM (CIP) 3.2) 175 TON HEAVY LIFT PORTAL CRANE (3) 3 2020 NAVY 1 0 1 - - - - - - - - - - - - - - - - - 3 2021 NAVY 1 0 1 - - - - - - - - - - - - - - - - - - 1 - - - - 0 3 2022 NAVY 1 0 1 - - - - - - - - - - - - - - - - - - - - - - 3 2023 NAVY 1 0 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 3 2025 NAVY 1 0 1 A - - - - - - - - - - 1 3 2026 NAVY 1 0 1 1 3 2027 NAVY 1 0 1 1 0 1 - 1 1 0 3.4) REACTOR SERVICING COMPLEX 4 2025 NAVY 1 A O C T LI 1445 - Operating Forces IPE Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #29 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 558 1 === page 637 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1445 / Operating Forces IPE Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 14 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Operating Forces IPE Fiscal Year 2026 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 3) KN300: SHIPYARD CAPITAL INVESTMENT PROGRAM (CIP) 3.2) 175 TON HEAVY LIFT PORTAL CRANE (3) 3 2020 NAVY 1 1 0 3 2021 NAVY 1 0 1 0 3 2022 NAVY 1 1 0 3 2023 NAVY 1 0 1 - - - - - - - - - - - 3 2025 NAVY 1 0 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 3 2026 NAVY 1 0 1 A - - - - - - - - - - - - - - - - - - - - - - 1 3 2027 NAVY 1 0 1 A - - - - - - - - - - 1 0 1 - 1 0 0 1 0 3.4) REACTOR SERVICING COMPLEX 4 2025 NAVY 1 O C T LI 1445 - Operating Forces IPE Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #29 1 M A R 0 A P R M A Y J U N J U L A U G S E P Volume 1 - 559 === page 638 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1445 / Operating Forces IPE Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 14 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Operating Forces IPE Fiscal Year 2028 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 3) KN300: SHIPYARD CAPITAL INVESTMENT PROGRAM (CIP) 3.2) 175 TON HEAVY LIFT PORTAL CRANE (3) 3 2020 NAVY 1 1 0 0 3 2021 NAVY 1 1 0 0 3 2022 NAVY 1 1 0 0 3 2023 NAVY 1 1 0 3 2025 NAVY 1 0 1 - - 3 2026 NAVY 1 0 1 - - - - - - - - - - - - - - 3 2027 NAVY 1 0 1 - - - - - - - - - - - - - - 1 0 0 1 0 1 0 - - - - - - - - - - 1 3.4) REACTOR SERVICING COMPLEX 4 2025 NAVY 1 0 O C T LI 1445 - Operating Forces IPE Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #29 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 560 === page 639 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1445 / Operating Forces IPE Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 14 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Operating Forces IPE Fiscal Year 2030 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 3) KN300: SHIPYARD CAPITAL INVESTMENT PROGRAM (CIP) 3.2) 175 TON HEAVY LIFT PORTAL CRANE (3) 3 2020 NAVY 1 1 0 0 3 2021 NAVY 1 1 0 0 3 2022 NAVY 1 1 0 0 3 2023 NAVY 1 1 0 0 3 2025 NAVY 1 1 0 0 3 2026 NAVY 1 1 0 3 2027 NAVY 1 0 1 1 0 0 - - 1 0 3.4) REACTOR SERVICING COMPLEX 4 2025 NAVY 1 0 O C T LI 1445 - Operating Forces IPE Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #29 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 561 === page 640 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 14 P-1 Line Item Number / Title: 1445 / Operating Forces IPE Aggregated Items: Operating Forces IPE Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 1 Konecranes - New Berlin, WI TBD 12 1 48 49 2 1 36 37 2 TBD - TBD TBD 2 6 12 18 0 0 0 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1445 - Operating Forces IPE Navy UNCLASSIFIED Page 18 of 18 P-1 Line #29 Volume 1 - 562 === page 641 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 15: Other Ship Support ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1600 / LCS Common Mission Modules Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 443 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 56.103 38.880 30.565 0.000 30.565 28.758 28.845 29.535 751.996 751.996 - - - - - - - - 56.103 38.880 30.565 0.000 30.565 28.758 28.845 29.535 751.996 To FY 2031 Complete - Total - 30.118 Continuing - Continuing - 30.118 Continuing - Continuing - - - - - - - - - - 56.103 38.880 30.565 0.000 30.565 28.758 28.845 29.535 30.118 Continuing Continuing 1.094 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 12.369 - - - - 1.146 0.546 1.183 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Littoral Combat Ship (LCS) focused mission packages provide the operational commander with capabilities to perform Mine Countermeasures (MCM) operations, and a Surface Warfare (SUW) detect-to-engage capability to counter small boat threats and aircraft such as drones. A Mission Package (MP) is a combination of warfare Mission Modules (MM) with specialized crew, support equipment, and vehicles, including embarked manned helicopters, unmanned aircraft and maritime systems. MMs are packaged in a modular fashion so that they can be quickly swapped in and out pier side on any LCS platform. The Common Mission Modules Equipment line funds the procurement of MCM and SUW MP support containers and C5I equipment that is common across the mission packages (Mission Package Computing Environment (MPCE), Technology Refresh of the Multi-Vehicle Communications System (MVCS), Mission Package Consoles (MPC) and Training Equipment). MCM and SUW support containers do not comprise a MP and are deployable only as part of a Mission Module (MM). A MM is deployable and capable of meeting its focused mission requirements on a LCS only when it includes the full complement of Common Mission Modules Equipment combined with all the required mission systems. Other Related Budgets: BLIs: OPN 1601, OPN 1602, OPN 1603, OPN 4248, OPN 2622, OPN 2624, WPN 4221, WPN 4225, RDT&E 0603596N, SCN 2127 [P40A / LM008 - MPCE]: Commercial Off The Shelf (COTS)- Based Common Computing environment will support legacy Mission Package (MP) Command & Control (C2) applications and transition to Modular Open Systems Approach (MOSA) & Navy Open Architecture Computing Environment (OACE). It also provides a common computing environment to support the execution of Mission Package Application Software (MPAS), the shipboard tactical software associated with each mission package that enables execution of its focused mission. Includes installation and checkout on-board the seaframe. In addition, Mission Package Portable Control Stations (MPPCS) are required to support pre-deployment checkouts, to support shore-based and vessels of opportunity operations of mission packages and off-board vehicles. [P40A / MPCE 2.X]: MPCE 2.X improves data extraction, data encryption, cybersecurity enhancements, and virtualization capabilities needed for all Mission Packages (MPs). MPCE 2.X baseline was split to support the evolution of different versions of the LCS. MPCE v2.0 for LCS Lethality and Survivability and MPCE v2.1 for non-Lethality and Survivability hulls. [P40A / LM012 - TRAINING EQUIPMENT]: Procurement of LCS Mission Module training systems for LCS crews to learn the safe and effective use of Mission Package equipment (mission systems, support equipment, and support containers). LCS MM Training is planned for several training sites including the LCS Training Facility (LTFs) Pacific in San Diego, CA and LFT Atlantic in Mayport, FL for all MPs; the Surface Combat Systems Training Command (SCSTC) in Dam neck, VA for the SUW MP; and at the Mine Warfare Training Center (MWTC) in San Diego, CA for the MCM MP. LI 1600 - LCS Common Mission Modules Equipment Navy UNCLASSIFIED Page 1 of 14 P-1 Line #30 Volume 1 - 563 === page 642 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 15: Other Ship Support ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1600 / LCS Common Mission Modules Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 443 The LTFs provide tactical watch team training as well as crew certifications using Common Mission Package Trainers (CMPT) in combination with the Integrated Tactical Trainers (ITTs). The LTFs also provide full scale replications of LCS mission bays where launch, recovery, and handling procedures for LCS MM systems is taught and practiced. LCS MM training covers various functions including operations, maintenance, tactical employment, and hands-on skills to achieve the key performance parameter objective of Train to Qualify and Train to Certify. CMPTs are used to train individuals in a team environment (Train to Qualify) and are also used to certify watch teams (TYCOM Training for Certification) during off hull periods at LTF. The LCS Integrated Tactical Trainer (ITT) uses the CMPT for mission package operations. Six CMPTs were procured and delivered from FY11-FY21to support three ITTs at LTF Mayport (LCS-1 configuration) and three ITTs at LTF San Diego (LCS-2 configuration). One ITT with CMPT in the LCS-1 configuration was decommissioned in FY 22 following decisions to reduce the overall training requirements. Full MCM and SUW integrated team training exists at LTF San Diego and full SUW capability in Mayport. MCM ITT functions with USV capability was procured in FY 2019 and delivered to each LTF in FY 2021. MCM USV with Mine Hunt capability as procured in FY 2022 for delivery to LTF Pacific and Mine Warfare Training Center in FY 2025. MCM MP: All unmanned vehicles, sensors, and systems in support containers to demonstrate Launch & Recovery (L&R) and maintenance tasks. Training involves operations, maintenance, tactical employment and physical movement of all unmanned vehicles, sensors, and systems with their associated support containers. Surface Training Advanced Virtual Environment for LCS (STAVE-LCS) (virtual reality) is planned to allow team training LCS Launch and Recovery of Unmanned Systems (USV and UUV) in FY 2024. Procurements are aligned to meet Fleet training throughput demands. [P40A / LM015 - CONTAINERS (SHIPPING & SUPPORT)]: Each MP variant uses a base Support Container (SC) which is an International Organization for Standardization (ISO) compliant shipping container, and comes in two variants: Type I and Type II. The Type I container is a 20-foot ISO container with nominal dimensions of 20' x 8' x 8'. The Type II container is a 10-foot ISO container with nominal dimensions of 10' x 8' x 8'. In both cases the base SC is constructed of high strength steel or aluminum to reduce the overall weight and features a number of standard configuration items. Mission systems fit inside standard ten- or twenty-foot ISO SCs, or on ISO compliant flat racks and vehicle cradles. The LCS MP zones inside each seaframe mission bay are configured to accommodate the SCs. [P40A / MCM SUPPORT CONTAINER]: Unit price for the MCM Support Containers is an average cost that does not reflect the actual cost of each container. Individual containers for each of the different MCM mission systems have unique requirements and vary in cost. Support containers store all the tools, spares, peculiar support equipment (PSE), consumables and personal protection equipment (PPE) required to maintain and operate the MP systems while on LCS deployment. [P40A / LM016 - MVCS]: The Multiple Vehicle Communications System (MVCS) provides the Littoral Combat Ship (LCS) Mission Modules with the capability to simultaneously communicate with multiple Unmanned Surface Vehicles (USVs) and surfaced Unmanned Undersea Vehicles (UUVs) by providing a common data link and network communication services. These services include both line of sight and satellite link establishment, link management, communications fail-safes, Emissions Control (EMCON) handling, encryption, data routing and protection, packet shaping, isolation via cross domain solution. Priority of Service (PoS), and automated communications system configuration. MVCS establishes a common interface for these services in the form of hardware and message definitions to maximize the usefulness of limited radio equipment onboard the LCS seaframe. [P40A / LM017 - Mission Module Display Modernization]: The Mission Module Display Modernization mitigates console hardware obsolescence and provides monitor resolution required to support the Mission Package operations. [P40A / LM900 - CONSULTING SERVICES]: Provides program management support, engineering and technical support, studies, analysis and evaluation on mission package systems. LI 1600 - LCS Common Mission Modules Equipment Navy UNCLASSIFIED Page 2 of 14 P-1 Line #30 Volume 1 - 564 === page 643 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 15: Other Ship Support ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1600 / LCS Common Mission Modules Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 443 Exhibits Schedule Exhibit Type Title* P-40a LCS MISSION MODULES P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 751.996 - / 56.103 - / 38.880 - / 30.565 - / 751.996 - / 56.103 - / 38.880 - / 30.565 - / - - / 30.565 / 0.000 - / 30.565 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding in LM008 (MPCE) supports the continued technology refresh of the MPCE. In FY 2027, the program continues the procurement of MPCE 2.X (MPCE 2.0 for Lethality and Survivability (L&S) and MPCE 2.1 for Non-L&S hulls) to address obsolescence, cyber security enhancements, and performance improvements in the MPCE baseline. Also, MPCE 2.X improves data extraction, data encryption, and virtualization capabilities which reduces the rack space needed for Post Mission Analysis (PMA) for all Mission Packages (MPs). 2.X baseline also includes upgraded graphics cards to support MM OBT capabilities. LM012 CMPT/MPTS Tech Refresh/Modernization: Funds the technology refresh of five CMPTs at the LCS Training Facilities (LTFs) in San Diego, CA / Mayport, FL. CMPT tech refreshes support the operation of MPCE version 2.0 software requirements. This line also supports technology refresh for the Mission Package Training System in LTF Atlantic in Mayport, which delivers SUW Mission Package and Surface-toSurface Missile Module operations training. LM015 supports the procurement of MCM Support Containers required to outfit LCS MCM configured Ships. Support containers are deployed on the ship with an embarked MP to store spares, tools, support equipment, and consumables required to maintain and operate the mission system and aircraft when deployed. LM016 (MVCS) supports procurement of MVCS Tech Refresh equipment including beyond-line-of-sight communications, software defined radio, anti-jamming capabilities, and Cross Domain Solution hardware to meet National Security Agency (NSA) mandated security requirements. LM017 (MP Console Obsolescence) The LCS Mission Package Consoles are a common console used by all of the LCS Mission Packages. Current consoles are provided as permanently installed equipment by the LCS seaframe vendor. The seven Mission Package consoles provide an interface for MP sailors to operate the mission package tactical software and conduct MP operations. The current Mission Package consoles are no longer supportable due to lack of available COTS parts. In addition to obsolescence, the tech refresh consoles will provide additional capability required by the MCM MP to conduct post mission analysis, display resolution and CPU processing that the existing consoles do not support. LI 1600 - LCS Common Mission Modules Equipment Navy UNCLASSIFIED Page 3 of 14 P-1 Line #30 Volume 1 - 565 === page 644 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1600 / LCS Common Mission Modules Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: LCS MISSION MODULES FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) LM001 - MCM Mission Package 1.1) USV A - - 1.725 - - - - - - - - - - - - - - - 1.2) USV - SWEEP A - - 2.410 - - - - - - - - - - - - - - - 1.3) RMMV A - - 17.008 - - - - - - - - - - - - - - - 1.4) RMMV CRADLE A 7,604K 2 15.208 - - - - - - - - - - - - - - - 1.5) AMNS A 4,272K 4 17.090 - - - - - - - - - - - - - - - 1.6) ALMDS A 6,622K 3 19.867 - - - - - - - - - - - - - - - 1.7) AN/AQS-20A A 8,769K 3 26.307 - - - - - - - - - - - - - - - 1.8) COBRA A 7,792K 1 7.792 - - - - - - - - - - - - - - - 1.9) MCM SUPPORT CONTAINERS A 1,547K 15 23.203 - - - - - - - - - - - - - - - 1.10) SUPPORT EQUIPMENT A - - 9.804 - - - - - - - - - - - - - - - 1.11) PRODUCTION ENGINEERING SUPPORT A - - 10.153 - - - - - - - - - - - - - - - 1.12) MCM INCREMENTAL WHOLENESS AQS-20A A 5.773 - - - - - - - - - - - - - - - 5,773K Subtotal: 1) LM001 - MCM Mission Package 1 - - 156.340 - - - - - - - - - - - - - - - - - 17.008 - - - - - - - - - - - - - - - - - 17.008 - - - - - - - - - - - - - - - 2) LM002 - ASW MISSION PACKAGE 2.1) ASW MISSION PACKAGE A Subtotal: 2) LM002 - ASW MISSION PACKAGE 3) LM003 - SUW MISSION PACKAGE 3.1) GUN MODULE A 3.2) SUW SHIPPING CONTAINER A 3.3) SUW SUPPORT CONTAINER A 3.4) SURFACE-TOSURFACE MISSILE MODULE A 3.5) PRODUCTION ENGINEERING A Subtotal: 3) LM003 - SUW MISSION PACKAGE 4,206K 6 25.237 - - - - - - - - - - - - - - - 144,833.33 6 0.869 - - - - - - - - - - - - - - - 980,250.00 4 3.921 - - - - - - - - - - - - - - - - - 2.400 - - - - - - - - - - - - - - - - - 2.013 - - - - - - - - - - - - - - - - - 34.440 - - - - - - - - - - - - - - - 4) LM005 - OBSOLESENCE MISSION MODULE ECPs LI 1600 - LCS Common Mission Modules Equipment Navy UNCLASSIFIED Page 4 of 14 P-1 Line #30 Volume 1 - 566 === page 645 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1600 / LCS Common Mission Modules Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 4.1) ENGINEERING CHANGE PROPOSALS A 4.2) LCS MISSION MODULES RADIO A 4.3) PRODUCTION ENGINEERING A MAIS Code Unit Cost ($) - Qty (Each) ($ M) - 1,540K Subtotal: 4) LM005 - OBSOLESENCE MISSION MODULE ECPs FY 2025 Total Cost 8 Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: LCS MISSION MODULES Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 22.558 - - - - - - - - - - - - - - - 12.316 - - - - - - - - - - - - - - - - - 1.436 - - - - - - - - - - - - - - - - - 36.310 - - - - - - - - - - - - - - - - - 5.885 - - - - - - - - - - - - - - - - - 5.885 - - - - - - - - - - - - - - - 5) LM007 - C-HAWKLINK SUPPORT EQUIPMENT 5.1) C-HAWKLINK SUPPORT EQUIPMENT A Subtotal: 5) LM007 - C-HAWKLINK SUPPORT EQUIPMENT 6) LM008 - MPCE 6.1) Mission Package Portable Control Station A 6.2) MPPCS Computing Hardware A 1,618K 2 3.237 - - - - - - - - - - - - - - - 886,500.00 6 5.319 - - - - - 0.700 - - 0.700 - - - - - 0.700 A 742,162.16 37 27.460 - - - - - - - - - - A 868,833.33 6 5.213 897,865.00 736,609.76 41 30.201 - - - - - - - 2,261K 4 9.043 - - - - - - 6.741 - - - - - (†) Tech Refresh 6.3) MPCE Hardware 6.4) MPCE 2.X (1)(†) 6.5) MPCE Tech (†) A Refresh 6.6) MPCE Sonar Signal Processing System (SSPS) A 6.7) MPCE SSPS Tech Refresh NRE A 6.8) PRODUCTION ENGINEERING A Subtotal: 6) LM008 - MPCE 6 5.387 916,000.00 6 - - - - 3.206 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 5.496 801,500.00 4 801,500.00 4 3.206 - - - - 7.946 - - 1.327 - - 0.484 - - 0.377 - - - - - 0.377 - - 95.160 - - 6.714 - - 6.680 - - 4.283 - - - - - 4.283 10.782 - - - - - - - - - - - - - - - 7) LM009 - DATA MISSION PAYLOAD 7.1) DATA MISSION PAYLOAD A 7.2) PRODUCTION ENGINEERING A 5,391K Subtotal: 7) LM009 - DATA MISSION PAYLOAD 2 - - 1.638 - - - - - - - - - - - - - - - - - 12.420 - - - - - - - - - - - - - - - 8) LM010 - MISSION PACKAGE INTEGRATION LI 1600 - LCS Common Mission Modules Equipment Navy UNCLASSIFIED Page 5 of 14 P-1 Line #30 Volume 1 - 567 === page 646 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1600 / LCS Common Mission Modules Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 8.1) MISSION PACKAGE PRODUCTION ENGINEERING & ASSEMBLY A MAIS Code Unit Cost ($) Subtotal: 8) LM010 - MISSION PACKAGE INTEGRATION FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: LCS MISSION MODULES Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 16.422 - - - - - - - - - - - - - - - - - 16.422 - - - - - - - - - - - - - - - 17.340 - - - - - - - - - - - - - - - 9) LM012 - TRAINING EQUIPMENT 9.1) COMMON MISSION PACKAGE TRAINER (CMPT) A 9.2) CMPT MPTS Tech Refresh/ A Modernization 3,468K (2) 9.3) MISSION PACKAGE TRAINING SYSTEM (MPTS) A 9.4) MK-50 GUN WEAPON SYSTEM TTE A 9.5) MCM MM On Board Trainer (OBT) A 9.6) MISSION BAY TRAINING DEVICES - MCM A 9.7) MISSION BAY TRAINING DEVICES - MCM Support Containers A 9.8) MISSION BAY TRAINING DEVICES - SUW A 5 - - 20.533 - - 1.694 - - 1.728 - - 1.762 - - - - - 1.762 - - 0.993 - - - - - - - - - - - - - - - 3.890 - - - - - - - - - - - - - - - 3,890K (3) Subtotal: 9) LM012 - TRAINING EQUIPMENT 1 - - - - - 6.000 - - - - - - - - - - - - - - 56.985 - - 4.506 - - 4.758 - - 4.337 - - - - - 4.337 - - 4.703 - - - - - - - - - - - - - - - - - 0.912 - - - - - - - - - - - - - - - - - 105.356 - - 12.200 - - 6.486 - - 6.099 - - - - - 6.099 15.402 - - - - - - - - - - - - - - - 10) LM013 - MARITIME SECURITY MODULE 10.1) MARITIME SECURITY MODULE A 10.2) PRODUCTION ENGINEERING A Subtotal: 10) LM013 - MARITIME SECURITY MODULE 7,701K 2 - - 1.279 - - - - - - - - - - - - - - - - - 16.681 - - - - - - - - - - - - - - - 76 119.216 1,863K 16.766 1,905K 11.432 1,911K 7.646 - - - 1,911K 11) LM015 - CONTAINERS (SHIPPING & SUPPORT) 11.1) MCM SUPPORT CONTAINER A (†) 1,569K LI 1600 - LCS Common Mission Modules Equipment Navy 9 6 UNCLASSIFIED Page 6 of 14 4 P-1 Line #30 4 7.646 Volume 1 - 568 === page 647 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1600 / LCS Common Mission Modules Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 11.2) SUW SUPPORT CONTAINER A 11.3) SUW SHIPPING CONTAINER A 11.4) LCS BERTHING CONTAINERS A 11.5) PRODUCTION ENGINEERING A MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: LCS MISSION MODULES Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 474,434.78 46 21.824 - - - - - - - - - - - - - - - 178,875.00 24 4.293 - - - - - - - - - - - - - - - - - - - - 4.900 - - - - - 1.370 - - - - - 1.370 - - 26.784 - - 0.955 - - 1.582 - - 0.573 - - - - - 0.573 - - 172.117 - - 22.621 - - 13.014 - - 9.589 - - - - - 9.589 - - 2.818 - - - - - - - - - - - - - - - - - 30.791 1,157K 3.470 2,013K 6.039 2,272K 6.817 - - - 2,272K - - 4.607 - - 0.428 - - 0.443 - - 0.339 - - - - - 0.339 - - 38.216 - - 3.898 - - 6.482 - - 7.156 - - - - - 7.156 2,493K 12 29.918 2,402K 9.610 2,450K 4.901 2,407K 2.407 - - - 2,407K - - 0.954 - - 0.713 - - 0.389 - - 0.682 - - - - - 0.682 - - 30.872 - - 10.323 - - 5.290 - - 3.089 - - - - - 3.089 - - 14.769 - - 0.347 - - 0.928 - - 0.349 - - - - - 0.349 Subtotal: 14) LM900 - CONSULTING SERVICES - - 14.769 - - 0.347 - - 0.928 - - 0.349 - - - - - 0.349 Total - - 751.996 - - 56.103 - - 38.880 - - 30.565 - - - - - 30.565 Subtotal: 11) LM015 - CONTAINERS (SHIPPING & SUPPORT) 12) LM016 - MVCS 12.1) Cyber Resilience A 12.2) MVCS Tech A Refresh (4) 12.3) Production Engineering A Subtotal: 12) LM016 - MVCS 3 3 3 3 6.817 13) LM017 - Mission Module Display Modernization 13.1) Mission Module Display Modernization A 13.2) Production Engineering A (5)(†) Subtotal: 13) LM017 - Mission Module Display Modernization 4 2 1 1 2.407 14) LM900 - CONSULTING SERVICES 14.1) CONSULTING SERVICES A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) MPCE 2.X support both L&S (MPCE 2.0) and non-L&S (MPCE 2.1) hulls. MPCE 2.x is required to support planned LCS Lethality and Survivability updates and hardware obsolescence. Funding supports procurement of MPCE to remain in alignment with these updates and ensure future compatibility between LCS combat system and mission modules. (2) (3) Procure CMPT tech refresh for phased maintenance updates in alignment with Fleet configuration changes for installation and check-out with lethality and survivability upgrades to LCS Integrated Tactical Trainers at each LTF learning site. SLD-25 Decision requires On Board Trainer (OBT) to be established in order to accommodate change in CONOPS associated with a new Area of operations (Ao). LI 1600 - LCS Common Mission Modules Equipment Navy UNCLASSIFIED Page 7 of 14 P-1 Line #30 Volume 1 - 569 === page 648 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 P-1 Line Item Number / Title: 1600 / LCS Common Mission Modules Equipment Aggregated Items Title: LCS MISSION MODULES (4) Cost and scope of MVCS Tech Refreshes varies each year based on the condition of the units that are being refreshed, as well as the components needed for each tech refresh kit due to different MVCS baselines and equipment (shipboard, lab, radios, etc.). (5) Mission Module Display Modernization quantities and unit costs represent per shipset (7 consoles per shipset). LI 1600 - LCS Common Mission Modules Equipment Navy UNCLASSIFIED Page 8 of 14 P-1 Line #30 Volume 1 - 570 === page 649 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 1600 / LCS Common Mission Modules Equipment Method/Type or Funding Vehicle Aggregated Items: LCS MISSION MODULES Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 6.2) MPPCS Computing Hardware Tech Refresh 2023 Advance Acoustic Concept / New MFG - Loc SS / FFP NAVSEA Sep 2023 Sep 2024 3 863,000.00 Y 6.2) MPPCS Computing Hardware Tech Refresh 2024 Advance Acoustic Concept / New MFG - Loc C / TBD ** NO PCO ** Oct 2023 Oct 2024 3 910,000.00 Y 2023 Advanced Acoustic Concept / Columbia, MD SS / FFP NAVSEA Sep 2023 Sep 2024 4 863,000.00 Y 2024 Advanced Acoustic Concept / Columbia, MD SS / FFP NAVSEA Jan 2024 Jan 2025 2 880,260.00 Y 2025 Advanced Acoustic Concept / Columbia, MD SS / FFP NAVSEA Jan 2025 Jan 2026 6 897,865.00 Y 2026 Advanced Acoustic Concept / Columbia, MD SS / FFP NAVSEA Jan 2026 Jan 2027 6 916,000.00 Y 2023 Advanced Acoustic Concept / Columbia, MD SS / FFP NAVSEA Sep 2023 Sep 2024 4 863,000.00 Y 2024 Advanced Acoustic Concept / Columbia, MD C / TBD ** NO PCO ** Oct 2023 Oct 2024 4 880,260.00 Y 2023 NORTHROP GRUMMAN / BETHPAGE, NEW YORK SS / FFP NAVSEA Sep 2023 Mar 2025 9 1,754K Y 2024 NORTHROP GRUMMAN / BETHPAGE, NEW YORK C / FFP NAVSEA Oct 2023 Apr 2025 8 1,694K Y 2025 NORTHROP GRUMMAN / BETHPAGE, NEW YORK C / FFP NAVSEA Oct 2024 Apr 2026 9 1,863K Y 2026 TBD (New Contract) / TBD C / FFP NAVSEA Oct 2026 Apr 2028 6 1,905K Y 2027 TBD (New Contract) / TBD C / TBD NAVSEA Oct 2026 Apr 2028 4 1,911K N 2023 NSWC PHD / Port Hueneme, CA WR ** NO PCO ** Apr 2023 Apr 2024 7 2,310K Y 2024 NSWC PHD / Port Hueneme, CA C / FFP ** NO PCO ** Apr 2024 Apr 2025 5 2,356K Y 2025 NSWC PHD / Port Hueneme, CA C / FFP ** NO PCO ** Apr 2025 Apr 2026 4 2,402K Y 2026 NSWC PHD / Port Hueneme, CA C / FFP ** NO PCO ** Apr 2026 Apr 2027 2 2,450K Y (Each) RFP Issue Date 6) LM008 - MPCE 6.4) MPCE 2.X (1)(†) 6.4) MPCE 2.X (1)(†) 6.4) MPCE 2.X (1)(†) 6.4) MPCE 2.X (1)(†) 6.5) MPCE Tech Refresh 6.5) MPCE Tech Refresh 11) LM015 - CONTAINERS (SHIPPING & SUPPORT) 11.1) MCM SUPPORT (†) CONTAINER 11.1) MCM SUPPORT (†) CONTAINER 11.1) MCM SUPPORT (†) CONTAINER 11.1) MCM SUPPORT (†) CONTAINER 11.1) MCM SUPPORT (†) CONTAINER 13) LM017 - Mission Module Display Modernization 13.1) Mission Module Display Modernization (5)(†) 13.1) Mission Module Display Modernization (5)(†) 13.1) Mission Module Display Modernization (5)(†) 13.1) Mission Module Display Modernization (5)(†) LI 1600 - LCS Common Mission Modules Equipment Navy UNCLASSIFIED Page 9 of 14 P-1 Line #30 Volume 1 - 571 === page 650 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Item Number / Title [DODIC] 13.1) Mission Module Display Modernization (†) (5)(†) O O C P-1 Line Item Number / Title: 1600 / LCS Common Mission Modules Equipment FY Contractor and Location Method/Type or Funding Vehicle 2027 NSWC PHD / Port Hueneme, CA C / TBD Aggregated Items: LCS MISSION MODULES Location of PCO Award Date Date of First Delivery ** NO PCO ** Oct 2026 Oct 2027 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) 1 2,407K RFP Issue Date N indicates the presence of a P-21 LI 1600 - LCS Common Mission Modules Equipment Navy UNCLASSIFIED Page 10 of 14 P-1 Line #30 Volume 1 - 572 === page 651 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1600 / LCS Common Mission Modules Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: LCS MISSION MODULES Fiscal Year 2023 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 6) LM008 - MPCE 6.4) MPCE 2.X (1) 5 2023 NAVY 4 0 4 5 2024 NAVY 2 0 2 A - - - - - - - - - - - - A - - - - - - - - 2 5 2025 NAVY 6 0 6 6 5 2026 NAVY 6 0 6 6 - 2 2 11) LM015 - CONTAINERS (SHIPPING & SUPPORT) 11.1) MCM SUPPORT CONTAINER Prior Years Deliveries: 59 6 2023 NAVY 9 0 9 6 2024 NAVY 8 0 8 A - - - - - - - - - - - - - 9 A - - - - - - - - - - - - 6 2025 NAVY 9 0 9 8 9 7 2026 NAVY 6 0 6 6 7 2027 NAVY 4 0 4 4 13) LM017 - Mission Module Display Modernization 13.1) Mission Module Display Modernization (5) 8 2023 NAVY 7 0 7 8 2024 NAVY 5 0 5 A - - - - - - - - - - - - 3 4 8 2025 NAVY 4 0 4 4 8 2026 NAVY 2 0 2 2 8 2027 NAVY 1 0 1 A - 0 - - - - - 5 1 O C T N O V D E C LI 1600 - LCS Common Mission Modules Equipment Navy J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 14 S E P O C T N O V D E C J A N F E B P-1 Line #30 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 573 === page 652 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1600 / LCS Common Mission Modules Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: LCS MISSION MODULES Fiscal Year 2025 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 6) LM008 - MPCE 6.4) MPCE 2.X (1) 5 2023 NAVY 4 2 2 5 2024 NAVY 2 0 2 5 2025 NAVY 6 0 6 5 2026 NAVY 6 0 6 2 0 - - - 2 0 A - - - - - - - - - - - - 2 2 A - 2 - 0 - - - - - - - 6 11) LM015 - CONTAINERS (SHIPPING & SUPPORT) 11.1) MCM SUPPORT CONTAINER Prior Years Deliveries: 59 6 2023 NAVY 9 0 9 - - - - - 6 2024 NAVY 8 0 8 - - - - - - 5 3 1 5 3 6 2025 NAVY 9 0 9 A - - - - - - 7 2026 NAVY 6 0 6 6 7 2027 NAVY 4 0 4 4 - 0 0 - - - - - - - - - - - 2 2 2 2 1 0 13) LM017 - Mission Module Display Modernization 13.1) Mission Module Display Modernization (5) 8 2023 NAVY 7 7 0 8 2024 NAVY 5 0 5 8 2025 NAVY 4 0 4 8 2026 NAVY 2 0 2 8 2027 NAVY 1 0 1 0 - - - - - - 3 2 A - 0 - - - - - - - - - - - 4 0 A - - - - - - 2 1 O C T N O V D E C LI 1600 - LCS Common Mission Modules Equipment Navy J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 14 S E P O C T N O V D E C J A N F E B P-1 Line #30 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 574 === page 653 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1600 / LCS Common Mission Modules Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: LCS MISSION MODULES Fiscal Year 2027 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 6) LM008 - MPCE 6.4) MPCE 2.X (1) 5 2023 NAVY 4 4 0 0 5 2024 NAVY 2 2 0 0 5 2025 NAVY 6 6 0 5 2026 NAVY 6 0 6 0 - - - 2 2 2 0 11) LM015 - CONTAINERS (SHIPPING & SUPPORT) 11.1) MCM SUPPORT CONTAINER Prior Years Deliveries: 59 6 2023 NAVY 9 9 0 0 6 2024 NAVY 8 8 0 0 6 2025 NAVY 9 9 0 7 2026 NAVY 6 0 6 A - - - - - - - - - - - - - - - - - - 1 1 7 2027 NAVY 4 0 4 A - - - - - - - - - - - - - - - - - - 2 2 0 1 1 1 1 0 0 13) LM017 - Mission Module Display Modernization 13.1) Mission Module Display Modernization (5) 8 2023 NAVY 7 7 0 0 8 2024 NAVY 5 5 0 0 8 2025 NAVY 4 4 0 8 2026 NAVY 2 0 2 - - - - - - 8 2027 NAVY 1 0 1 A - - - - - - 0 O C T N O V D E C LI 1600 - LCS Common Mission Modules Equipment Navy J A N F E B M A R 2 0 A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 14 S E P 1 O C T 0 N O V D E C J A N F E B P-1 Line #30 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 575 === page 654 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1600 / LCS Common Mission Modules Equipment Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Production Rates (Each / Year) MFR Ref # Aggregated Items: LCS MISSION MODULES Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Advanced Acoustic Concept Columbia, MD 1 4 8 0 0 12 12 0 0 12 12 2 NORTHROP GRUMMAN BETHPAGE, NEW YORK 1 7 20 3 3 18 21 3 3 18 21 3 TBD (New Contract) - TBD 1 7 20 3 3 18 21 3 3 18 21 4 NSWC PHD - Port Hueneme, CA 1 8 12 0 0 12 12 0 0 12 12 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1600 - LCS Common Mission Modules Equipment Navy UNCLASSIFIED Page 14 of 14 P-1 Line #30 Volume 1 - 576 === page 655 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 15: Other Ship Support ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1601 / LCS MCM Mission Modules Program Elements for Code B Items: N/A Other Related Program Elements: 0603596N Line Item MDAP/MAIS Code: 000 Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 768.590 768.590 768.590 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 91.372 65.113 0.000 65.113 57.335 52.034 52.999 118.247 118.247 118.247 - - - - - - - 91.372 65.113 0.000 65.113 57.335 52.034 52.999 To FY 2031 Complete - Total - 53.894 Continuing - Continuing - 53.894 Continuing - Continuing - - - - - - - - - 91.372 65.113 0.000 65.113 57.335 52.034 52.999 53.894 Continuing Continuing 35.357 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 3.846 - 13.847 - 13.847 11.404 2.383 23.313 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Littoral Combat Ship (LCS) Mine Countermeasures (MCM) Mission Package (MP) counters bottom, tethered, near surface, and surface mines in the littorals without putting Sailors in the minefield. When the MCM MP is embarked, LCS is capable of conducting detect-to-engage operations (hunting, sweeping, and neutralization) against shallow and deep-water sea mine threats. The MCM MP provides these capabilities through the use of sensors and weapons deployed from an embarked MH-60S multi-mission helicopter and unmanned offboard vehicles. MCM MP achieved Initial Operational Capability in 31MAR2023. The embarked MH-60S employs the Organic Airborne Mine Countermeasures (OAMCM) systems to provide rapid and long range airborne detection and neutralization to clear operations in littoral zones, confined straits, choke points, and the Amphibious Operations Area (AOA) quickly. The Airborne Mine Neutralization (AMN) Module (MH-60S Helo + Airborne Mine Neutralization System) and Near Surface Detection (NSD) Module (MH-60S Helo + Airborne Laser Mine Detection System) achieved Initial Operational Capability (IOC) in FY 2017. The Unmanned Minesweeping (UMS) Module is composed of the MCM Unmanned Surface Vehicle (USV) and Minesweeping Payload Delivery System (PDS) and Towed Acoustic Generator (TAG). The MCM USV and Minesweeping PDS was previously known as Unmanned Influence Sweeping System (UISS) which achieved Milestone C and is currently in Full Rate Initial Production (FRIP). The Remote Minehunting (RMH) Module consists of a PDS and a Towed Sonar which detects and identifies bottom and tethered mines. In FY 2020, the MCM USV established a mature Technical Data Package (TDP) and was used for the award of the Production contract in FY2022. The Unmanned Influence Sweep System (UISS) TDP is mature and is being leveraged to procure Minesweeping PDS in Q1FY2025. In FY 2022, the Minehunting PDS was procured via a sole source delivery order on the Raytheon IDIQ contract. A competitive production contract was awarded for future Minehunting PDS procurements in Q1 FY2025. The Mine Neutralization (MN) module will consist of the MCM USV with a near-surface mine neutralization payload, necessitating future procurement of MN PDSs. The Buried Minehunting (BMH) Module (Knifefish Unmanned Undersea Vehicle) detects and identifies buried mines and mines in a high clutter environment. The program achieved Milestone C in FY 2019 and entered into Low Rate Initial Production (LRIP) for five (5) Block 0 systems in FY 2019. In FY 2021, prime contractor for Knifefish is General Dynamics Mission Systems (GDMS) located in Quincy, MA, was awarded a contract to retrofit the LRIP systems with Block 1 capabilities and upgrade a number of performance characteristics to meet Navy bottom and buried mine hunting requirements. The Navy will conduct a limited validation of these capabilities during system acceptance testing and sell off to the government in Q1-Q3FY24. Upon delivery of these systems to the Navy, they were available for limited Fleet operations from LCS or Vessels of Opportunity (VOO). In FY25, the systems were transferred to several S&T organizations for experimentation. The MCM MP system procurements in this BLI are critical to deliver MCM MPs with the capability of the full detect-to-neutralize sequence and replace legacy MCM platforms. LI 1601 - LCS MCM Mission Modules Navy UNCLASSIFIED Page 1 of 14 P-1 Line #31 Volume 1 - 577 === page 656 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 15: Other Ship Support ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1601 / LCS MCM Mission Modules Program Elements for Code B Items: N/A Other Related Program Elements: 0603596N Line Item MDAP/MAIS Code: 000 The MCM MP is deployable and capable of meeting its focused mission requirements on an LCS only when it includes the full complement of Common Mission Modules Equipment (Line Item Number 1600) and the full complement of mission systems that comprise each MCM Mission Package (Line Item Number 1601). PMS 420 continues to partner with developmental agencies to explore potential new capabilities, including deep water for future integration into the broader MCM USV payload portfolio. Capability demonstrations planned by first quarter FY2027. Other Related Budgets: BLIs: OPN 1600, RDT&E 0603596N, RDT&E 0604028N, RDT&E 0603502N, RDT&E 0604127N LI 1601 - LCS MCM Mission Modules Navy UNCLASSIFIED Page 2 of 14 P-1 Line #31 Volume 1 - 578 === page 657 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 15: Other Ship Support ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1601 / LCS MCM Mission Modules Program Elements for Code B Items: N/A Other Related Program Elements: 0603596N Line Item MDAP/MAIS Code: 000 Exhibits Schedule Exhibit Type Title* P-5 1 / LCS MCM Mission Packages P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 768.590 - / 118.247 - / 91.372 - / 65.113 - / 0.000 - / 65.113 - / 768.590 - / 118.247 - / 91.372 - / 65.113 - / 0.000 - / 65.113 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding includes the following mission systems and associated MP support equipment: In FY 2027 the program will procure one MCM Unmanned Surface Vehicle (USV), one Minesweeping PDS, four Minehunting PDS, two AN/AQS-20C variable depth Minehunting Sonar and will procure MCM MP support equipment. Additionally, the program will implement Engineering Change Proposals (ECPs) on procured production MCM USVs and perform tech refreshes to address AQS-20C obsolescence. ECPs will also be implemented on both PDS's and Twin Boom Extensible Crane (TEBC). The support equipment includes; USV redesigned Surface Tow Cradles (STC-Rs), USV Stowage Cradles, LCS PMA Table Fixture Devices (TFD), and Peculiar Support Equipment (PSE) kit for USV and UISS. All MCM assets procured support MCM configured ship deployments. System procurements include the limiting factors required to deliver MCM MPs with the full complement of systems needed to perform the detect-to-neutralize sequence. These systems are critical to complete delivery of MPs to replace legacy MCM platforms. Note: The Remote Minehunting Module (RMH) contract is set to award in Q4 FY 2026 under the MC008 line. Option year 1 will award in FY 2027 which includes 2 RMHs (2 PDS + 2 Sonar). LI 1601 - LCS MCM Mission Modules Navy UNCLASSIFIED Page 3 of 14 P-1 Line #31 Volume 1 - 579 === page 658 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1601 / LCS MCM Mission Modules Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / LCS MCM Mission Packages MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) 768.590 Less PY Advance Procurement ($ in Millions) 118.247 - Net Procurement (P-1) ($ in Millions) 118.247 - Total Obligation Authority ($ in Millions) FY 2027 OOC - - - 91.372 65.113 0.000 65.113 - 768.590 Plus CY Advance Procurement ($ in Millions) FY 2027 Base - - - - - - 91.372 65.113 0.000 65.113 - 768.590 118.247 FY 2027 Total - - - - 91.372 65.113 0.000 65.113 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 3.846 - 9.853 - 9.853 Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - MC001 - UNMANNED MINESWEEPING (UMS) MODULE Cost Recurring Cost 1.1.1) Minesweeping Payload Delivery System with Towed Acoustic Generator TAG 2,637K 8 21.096 2,441K 1 2.441 4,112K 1 1 4.112 4,288K 1 4.288 - - - 4,288K 1 4.288 (†) 1.1.2) Electromagnetic (†) Sweep Cables Subtotal: Recurring Cost Subtotal: Hardware MC001 - UNMANNED MINESWEEPING (UMS) MODULE Cost 1,460K 7.302 1,802K 1.802 - - - - - - - - - - - - - - 5 28.398 - - 4.243 - - 4.112 - - 4.288 - - - - - 4.288 - - 28.398 - - 4.243 - - 4.112 - - 4.288 - - - - - 4.288 53.730 - - - - - - - - - - - - Hardware - MC002 - MCM UNMANNED SURFACE VEHICLES Cost Recurring Cost 2.1.1) MCM Unmanned Surface Vehicle (USV) 7,796K 16 124.729 5,970K 9 2.1.2) MCM USV ECPs - - 31.045 - - 2.783 - - 2.382 - - 2.935 - - - - - 2.935 2.1.3) Cyber Security Upgrades - - 6.965 - - - - - - - - - - - - - - - 2.1.4) MCM USV Production ECP NRE - - 10.349 - - - - - - - - - - - - - - - (†) (1) Flyaway Costs LI 1601 - LCS MCM Mission Modules Navy UNCLASSIFIED Page 4 of 14 P-1 Line #31 Volume 1 - 580 === page 659 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1601 / LCS MCM Mission Modules Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / LCS MCM Mission Packages MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 2.1.5) TBEC ECPs - - 2.200 - - 2.400 - - 6.000 - - 4.800 - - - - - 4.800 Subtotal: Recurring Cost - - 175.288 - - 58.913 - - 8.382 - - 7.735 - - - - - 7.735 Subtotal: Hardware MC002 - MCM UNMANNED SURFACE VEHICLES Cost - - 175.288 - - 58.913 - - 8.382 - - 7.735 - - - - - 7.735 Hardware - MC003 - ORGANIC AIRBORNE MINE COUNTERMEASURES (OAMCM) SYSTEMS Cost Recurring Cost 3.1.1) AN/ASQ-235 Airborne Mine Neutralization System 4,266K 14 59.717 - - - - - - - - - - - - - - - 3.1.2) AN/AES-1 Airborne Laser Mine Detection System 10,638K 8 85.107 - - - - - - - - - - - - - - - 3.1.3) AN/ASQ-235 AMNS Technology Refresh and Obsolescence Upgrades - - 8.976 - - - - - - - - - - - - - - - 3.1.4) AN/AES-1 ALMDS Technology Refresh and Obsolescence Upgrades - - 10.586 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 164.386 - - - - - - - - - - - - - - - Subtotal: Hardware MC003 - ORGANIC AIRBORNE MINE COUNTERMEASURES (OAMCM) SYSTEMS Cost - - 164.386 - - - - - - - - - - - - - - - Hardware - MC005 - BURIED MINEHUNTING MODULE Cost Recurring Cost 4.1.1) KNIFEFISH 7,302K 2 14.604 - - - - - - - - - - - - - - - 4.1.2) Knifefish Retrofit Kits 4,791K 5 23.954 - - - - - - - - - - - - - - - 4.1.3) Knifefish Production NRE - - 6.700 - - - - - - - - - - - - - - - 4.1.4) Knifefish ECP - - 10.920 - - - - - - - - - - - - - - - 4.1.5) Ancillary Equipment and Container Outfitting 4,198K 8.396 - - - - - - - - - - - - - - - 4.1.6) Steel BOA (replacement in kind) - 4.600 - - - - - - - - - - - - - - - 2 - LI 1601 - LCS MCM Mission Modules Navy UNCLASSIFIED Page 5 of 14 P-1 Line #31 Volume 1 - 581 === page 660 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1601 / LCS MCM Mission Modules Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / LCS MCM Mission Packages MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Subtotal: Recurring Cost - - 69.174 - - - - - - - - - - - - - - - Subtotal: Hardware - MC005 - BURIED MINEHUNTING MODULE Cost - - 69.174 - - - - - - - - - - - - - - - Hardware - MC006 - MCM SUPPORT EQUIPMENT Cost Recurring Cost 5.1.1) SUPPORT EQUIPMENT - - 67.874 - - 14.734 - - 15.424 - - 8.920 - - - - - 8.920 Subtotal: Recurring Cost - - 67.874 - - 14.734 - - 15.424 - - 8.920 - - - - - 8.920 Subtotal: Hardware MC006 - MCM SUPPORT EQUIPMENT Cost - - 67.874 - - 14.734 - - 15.424 - - 8.920 - - - - - 8.920 15.806 4,114K 2 8.227 4,196K 4 16.784 - - - 4,196K 4 16.784 22,126K 2 44.251 10,465K 2 20.929 - - - 10,465K 2 20.929 Hardware - MC008 - REMOTE MINEHUNTING MODULE Cost Recurring Cost 6.1.1) Minehunting Payload Delivery 5,302K 8 42.414 3,161K 6,660K 10 66.600 - - - 7,131K 10 71.306 - - 14.068 - - - - - - - - - - - - - - 7.333 - - 3.000 - - 3.649 - - 2.602 - - - - - 2.602 Subtotal: Recurring Cost - - 187.653 - - 32.874 - - 56.127 - - 40.315 - - - - - 40.315 Subtotal: Hardware - MC008 - REMOTE MINEHUNTING MODULE Cost - - 187.653 - - 32.874 - - 56.127 - - 40.315 - - - - - 40.315 System (†) 6.1.2) AN/AQS-20C (†) (2) 6.1.3) AQS-20C Upgrades 6.1.4) AQS-20C Obsolescence/ Technology Refresh (3) 5 Support - MC900 - CONSULTING SERVICES Cost 7.1) CONSULTING SERVICES - - 18.430 - - 1.887 - - 1.920 - - 1.205 - - - - - 1.205 Subtotal: Support - MC900 - CONSULTING SERVICES Cost - - 18.430 - - 1.887 - - 1.920 - - 1.205 - - - - - 1.205 - 2.737 - - 1.210 - - 0.579 - - 0.498 - - - - - 0.498 Support - PRODUCTION ENGINEERING Cost 8.1) MC001 UNMANNED INFLUENCE MINE SWEEP - LI 1601 - LCS MCM Mission Modules Navy UNCLASSIFIED Page 6 of 14 P-1 Line #31 Volume 1 - 582 === page 661 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1601 / LCS MCM Mission Modules Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / LCS MCM Mission Packages MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 8.2) MC002 - MCM UNMANNED SURFACE VEHICLE (USV) - - 7.209 - - 1.395 - - 1.358 - - 0.998 - - - - - 0.998 8.3) MC003 - ORGANIC AIRBORNE MINE COUNTERMEASURES (OAMCM) - - 22.743 - - - - - - - - - - - - - - - 8.4) MC004 - COASTAL MINE RECONNAISANCE MODULE - - 2.265 - - - - - - - - - - - - - - - 8.5) MC005 - BURIED MINEHUNTING MODULE - - 5.396 - - - - - - - - - - - - - - - 8.6) MC006 - MCM SUPPORT EQUIPMENT - - 8.053 - - 0.842 - - 0.752 - - 0.400 - - - - - 0.400 8.7) MC008 REMOTE MINEHUNTING MODULE - - 8.984 - - 2.149 - - 2.718 - - 0.754 - - - - - 0.754 Subtotal: Support - PRODUCTION ENGINEERING Cost - - 57.387 - - 5.596 - - 5.407 - - 2.650 - - - - - 2.650 Gross/Weapon System Cost - - 768.590 - - 118.247 - - 91.372 - - 65.113 - - 0.000 - - 65.113 Remarks: [Hardware] MC001 - The Unmanned Minesweeping Module provides an unmanned surface, long endurance bottom sweep capability to clear large areas of mines that may remain after minehunting operations are complete or in areas of operation where minehunting is less feasible. The UMS Module cost element funds the procurement of the Minesweeping Payload Delivery System to include the magnetic sweep cable and acoustic MK-104 payload. The USVs are procured in the MC002 USVs cost element. [Hardware] MC002 - There are two USVs per MCM MP which will be reconfigurable for sweep, hunt, and eventually neutralization missions. Four MCM USVs have been procured as Low Rate Initial Production (LRIP) units on the UISS contract. The program is incorporating engineering changes proposals (ECPs) kits to upgrade all previously procured UISS assets to the common configuration (enables sweep, hunt, and neutralization). In April 0f 2022, the program awarded a competitively sought contract to procure MCM USVs in the common configuration. All future procurements will be the common configuration. [Hardware] MC006 - MCM SUPPORT EQUIPMENT]: Support equipment related to the individual modules and in support of the overall Mission Package. [Hardware] MC008 - The Remote Minehunting (RMH) Module consists of a Payload Delivery System (PDS) for deploying and retrieving the minehunting sonar. The RMH Module cost element funds the procurement of the PDS and minehunting sonar payloads. The USVs are procured in the MC002 - USVs cost element. The Remote Minehunting Module (RMH) (PDS + Sonar) contract is set to award in Q4 FY26. [Support Cost] MC900 - Provides program management support, engineering and technical support, studies, analysis and evaluation on mission module systems. LI 1601 - LCS MCM Mission Modules Navy UNCLASSIFIED Page 7 of 14 P-1 Line #31 Volume 1 - 583 === page 662 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 P-1 Line Item Number / Title: 1601 / LCS MCM Mission Modules ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / LCS MCM Mission Packages MDAP/MAIS Code: [Support Cost] Production Engineering is required in all years of procurement as well as 15-24 months after procurement to support continuing production efforts and fund acceptance testing in year of delivery. (†) indicates the presence of a P-5a Footnotes: (1) Current funding profile does not support realistic contract award quantities or price per unit. Current MSR of QTY 4 for industry means that industry will either not bid to build 1 or 2 MCM USVs a year or the price of the USV will be significantly higher than what is in the FYDP, resulting in an inability to successfully procure sufficient MCM USVs for future MCM MPs. Unit costs for low-quantity orders have been scaled up ~20% based on existing contract stepladder pricing. The program currently explores a Multi-Mission Unmanned Surface Vehicle (MMUSV) as a lower-cost variant of the MCM USV to help alleviate challenges associated with current funding profile. (2) NRE included in first two procurements, thus increasing unit costs. NRE is not applied to subsequent procurements. RMH funding award has shifted into Q4 FY26. Option year 1 will award in FY27 which includes 2 RMHs (2 PDS + 2 Sonar). (3) Program changes from FY25 to FY27 funds upgrades to the AN/AQS-20-1 to -2 configuration to align to fielding schedule. LI 1601 - LCS MCM Mission Modules Navy UNCLASSIFIED Page 8 of 14 P-1 Line #31 Volume 1 - 584 === page 663 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 O O C Cost Elements 1.1.1) Minesweeping Payload Delivery System with Towed Acoustic Generator TAG (†) 1.1.1) Minesweeping Payload Delivery System with Towed Acoustic Generator TAG (†) 1.1.1) Minesweeping Payload Delivery System with Towed Acoustic Generator TAG (†) 1.1.1) Minesweeping Payload Delivery System with Towed Acoustic Generator TAG (†) 1.1.2) Electromagnetic Sweep Cables (†) 1.1.2) Electromagnetic Sweep Cables (†) 2.1.1) MCM Unmanned Surface (†) Vehicle (USV) Flyaway Costs 2.1.1) MCM Unmanned Surface (†) Vehicle (USV) Flyaway Costs 6.1.1) Minehunting Payload Delivery System (†) 6.1.1) Minehunting Payload Delivery System (†) 6.1.1) Minehunting Payload Delivery System (†) 6.1.1) Minehunting Payload Delivery System (†) (†) P-1 Line Item Number / Title: 1601 / LCS MCM Mission Modules Item Number / Title [DODIC]: 1 / LCS MCM Mission Packages FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) 2024 Textron / Hunt Valley, MD C / FFP NAVSEA Oct 2024 Oct 2026 4 3,050K Y 2025 Textron / Hunt Valley, MD C / FFP NAVSEA Jan 2025 Jan 2027 1 2,441K Y 2026 Textron / Hunt Valley, MD C / FFP NAVSEA Jan 2026 Jan 2028 1 4,112K Y 2027 Textron / Hunt Valley, MD C / FFP NAVSEA Oct 2026 Oct 2028 1 4,288K Y 2024 Textron / Hunt Valley, MD C / FFP NAVSEA Feb 2025 Jan 2026 1 1,802K Y 2025 Textron / Hunt Valley, MD C / TBD ** NO PCO ** Feb 2025 Mar 2026 1 1,802K Y 2024 Bollinger Shipyards / Lockport, LA C / FFP NAVSEA Dec 2023 Aug 2026 5 6,000K Y 2025 Bollinger Shipyards / Lockport, LA C / FFP NAVSEA May 2025 May 2027 9 5,970K Y 2023 Raytheon / Portmouth, RI C / IDIQ NAVSEA Jun 2023 Feb 2026 2 3,876K Y 2025 Raytheon / Portmouth, RI C / FFP NAVSEA Nov 2024 Jul 2026 5 3,161K Y 2026 Raytheon / Portmouth, RI C / FFP ** NO PCO ** Jan 2026 Sep 2027 2 4,114K Y 2027 Raytheon / Portmouth, RI C / TBD ** NO PCO ** Oct 2026 Jun 2028 4 4,196K N Qty (Each) 6.1.2) AN/AQS-20C (†) 2026 Manufacturer TBD / TBD C / FFP NAVSEA Jul 2026 Jul 2028 2 22,126K Y 6.1.2) AN/AQS-20C (†) 2027 TBD / TBD C / TBD ** NO PCO ** Oct 2026 Oct 2028 2 10,465K N RFP Issue Date indicates the presence of a P-21 LI 1601 - LCS MCM Mission Modules Navy UNCLASSIFIED Page 9 of 14 P-1 Line #31 Volume 1 - 585 === page 664 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1601 / LCS MCM Mission Modules Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / LCS MCM Mission Packages Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) Minesweeping Payload Delivery System with Towed Acoustic Generator TAG Prior Years Deliveries: 4 1 2024 NAVY 4 0 4 4 1 2025 NAVY 1 0 1 1 1 2026 NAVY 1 0 1 1 1 2027 NAVY 1 0 1 1 1 1.1.2) Electromagnetic Sweep Cables Prior Years Deliveries: 4 2 2024 NAVY 1 0 1 2 2025 NAVY 1 0 1 1 2.1.1) MCM Unmanned Surface Vehicle (USV) Flyaway Costs (1) Prior Years Deliveries: 11 3 2024 NAVY 5 0 5 3 2025 NAVY 9 0 9 A - - - - - - - - - - 5 9 6.1.1) Minehunting Payload Delivery System Prior Years Deliveries: 6 4 2023 NAVY 2 0 2 4 2025 NAVY 5 0 5 5 4 2026 NAVY 2 0 2 2 4 2027 NAVY 4 0 4 4 2 6.1.2) AN/AQS-20C A - - - - - - - - - - - - - - - - 2 (2) Prior Years Deliveries: 10 6 2026 NAVY 2 0 2 5 2027 NAVY 2 0 2 2 O C T LI 1601 - LCS MCM Mission Modules Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 14 S E P O C T N O V D E C J A N F E B P-1 Line #31 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 586 === page 665 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1601 / LCS MCM Mission Modules Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / LCS MCM Mission Packages Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) Minesweeping Payload Delivery System with Towed Acoustic Generator TAG Prior Years Deliveries: 4 1 2024 NAVY 4 0 4 1 2025 NAVY 1 0 1 1 2026 NAVY 1 0 1 1 2027 NAVY 1 0 1 A - - - - - - - - - - - - - - - - - - - - - - - - 4 A - - - - - - - - - - - - - - - - - - - - - 1 A - - - - - - - - - 1 1 1.1.2) Electromagnetic Sweep Cables Prior Years Deliveries: 4 2 2024 NAVY 1 0 1 A - - - - - - - - - - - 2 2025 NAVY 1 0 1 A - - - - - - - - - - - - - - - - 2.1.1) MCM Unmanned Surface Vehicle (USV) Flyaway Costs 1 0 1 0 (1) Prior Years Deliveries: 11 3 2024 NAVY 5 0 5 3 2025 NAVY 9 0 9 - - - - - - - - - - - - - - - - - - - A - - - - - - - - - - - - - - - 1 1 3 - - 9 - - 4 - - 2 6.1.1) Minehunting Payload Delivery System Prior Years Deliveries: 6 4 2023 NAVY 2 0 2 4 2025 NAVY 5 0 5 4 2026 NAVY 2 0 2 4 2027 NAVY 4 0 4 6.1.2) AN/AQS-20C - - - - - - - - - - - - - - - - A - - - - - - - - - - - - - - - - 2 - - - - 0 A - - - - - - 1 - 4 (2) Prior Years Deliveries: 10 6 2026 NAVY 2 0 2 5 2027 NAVY 2 0 2 A - - 2 2 O C T LI 1601 - LCS MCM Mission Modules Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 14 S E P O C T N O V D E C J A N F E B P-1 Line #31 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 587 === page 666 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1601 / LCS MCM Mission Modules Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / LCS MCM Mission Packages Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) Minesweeping Payload Delivery System with Towed Acoustic Generator TAG Prior Years Deliveries: 4 1 2024 NAVY 4 0 4 1 2025 NAVY 1 0 1 - 1 - 1 - 1 - 1 0 1 2026 NAVY 1 0 1 - - - - - - - - - - - - - - - 1 2027 NAVY 1 0 1 A - - - - - - - - - - - - - - - 1 0 1 0 - - - - - - - - - 1 1.1.2) Electromagnetic Sweep Cables Prior Years Deliveries: 4 2 2024 NAVY 1 1 0 2 2025 NAVY 1 1 0 0 0 2.1.1) MCM Unmanned Surface Vehicle (USV) Flyaway Costs (1) Prior Years Deliveries: 11 3 2024 NAVY 5 2 3 - 3 2025 NAVY 9 0 9 - 1 - - 1 - - - 1 - 0 - - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 0 6.1.1) Minehunting Payload Delivery System Prior Years Deliveries: 6 4 2023 NAVY 2 2 0 4 2025 NAVY 5 1 4 - 4 2026 NAVY 2 0 2 - - - - - - - - - - - 4 2027 NAVY 4 0 4 A - - - - - - - - - - - - - - - - - - - - 6.1.2) AN/AQS-20C 0 1 1 2 0 2 0 2 - 2 0 (2) Prior Years Deliveries: 10 6 2026 NAVY 2 0 2 - - - - - - - - - - - - - - - - - - - - - 5 2027 NAVY 2 0 2 A - - - - - - - - - - - - - - - - - - - - - O C T LI 1601 - LCS MCM Mission Modules Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 14 S E P O C T N O V D E C J A N F E B P-1 Line #31 M A R A P R M A Y J U N 1 - J U L 1 A U G S E P Volume 1 - 588 0 2 === page 667 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1601 / LCS MCM Mission Modules Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / LCS MCM Mission Packages Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.1.1) Minesweeping Payload Delivery System with Towed Acoustic Generator TAG Prior Years Deliveries: 4 1 2024 NAVY 4 4 0 0 1 2025 NAVY 1 1 0 0 1 2026 NAVY 1 1 0 1 2027 NAVY 1 0 1 0 1 0 1.1.2) Electromagnetic Sweep Cables Prior Years Deliveries: 4 2 2024 NAVY 1 1 0 2 2025 NAVY 1 1 0 0 0 2.1.1) MCM Unmanned Surface Vehicle (USV) Flyaway Costs (1) Prior Years Deliveries: 11 3 2024 NAVY 5 5 0 0 3 2025 NAVY 9 9 0 0 6.1.1) Minehunting Payload Delivery System Prior Years Deliveries: 6 4 2023 NAVY 2 2 0 0 4 2025 NAVY 5 5 0 0 4 2026 NAVY 2 2 0 0 4 2027 NAVY 4 4 0 0 6.1.2) AN/AQS-20C (2) Prior Years Deliveries: 10 6 2026 NAVY 2 2 0 5 2027 NAVY 2 0 2 0 1 O C T LI 1601 - LCS MCM Mission Modules Navy N O V 1 D E C 0 J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 14 S E P O C T N O V D E C J A N F E B P-1 Line #31 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 589 === page 668 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1601 / LCS MCM Mission Modules Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Item Number / Title [DODIC]: 1 / LCS MCM Mission Packages Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Textron - Hunt Valley, MD 1 6 10 3 0 24 24 0 0 24 24 2 Textron - Hunt Valley, MD 2 4 8 0 0 11 11 0 0 13 13 3 Bollinger Shipyards Lockport, LA 1 6 10 3 0 32 32 0 0 24 24 4 Raytheon - Portmouth, RI 1 6 10 3 0 12 12 0 0 20 20 5 TBD - TBD 2 3 8 3 0 24 24 3 0 24 24 6 Manufacturer TBD - TBD 2 3 8 3 0 24 24 3 0 24 24 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1601 - LCS MCM Mission Modules Navy UNCLASSIFIED Page 14 of 14 P-1 Line #31 Volume 1 - 590 === page 669 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 15: Other Ship Support ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1603 / LCS SUW Mission Modules Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 203.720 203.720 203.720 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 11.101 3.790 1.719 0.000 1.719 2.587 3.326 3.509 3.578 0.710 - - - - - - - - - - 11.101 3.790 1.719 0.000 1.719 2.587 3.326 3.509 3.578 0.710 Total 234.040 234.040 - - - - - - - - - - 11.101 3.790 1.719 0.000 1.719 2.587 3.326 3.509 3.578 0.710 234.040 - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - 4.587 - - - 4.587 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Surface Warfare (SUW) Mission Package (MP) provides Littoral Combat Ships (LCS) with increased firepower and offensive/defensive capabilities against large numbers of small manned and unmanned threats including fast attack craft, fast inshore attack craft, and aircraft, giving LCS the ability to protect the sea lanes and move a force quickly through a choke point or other strategic waterway. The SUW MP is composed of the following modules: Surface-to-Surface Missile Module (SSMM), Gun Mission Module (GMM), Maritime Security Module (MSM), and an Aviation Module. The SSMM provides offensive firepower to engage enemy threats at close range. A recent capability upgrade allows the SSMM to counter aircraft like drones, extending defense in addition to fast attack and fast inshore attack craft. The SSMM is comprised 24 Longbow Hellfire Missiles, 12 MK210 Launchers, and supporting hardware. The GMM augments the ship's 57mm gun with two high-velocity 30mm cannons. The MSM supports the embarkation of Visit, Board, Search, and Seizure (VBSS) teams. The Aviation Module incorporates various unmanned aircraft for surveillance. The GMM, MSM, and initial Aviation Module (with the MH-60R/S) achieved Initial Operational Capability (IOC) in FY 2014. The SSMM achieved IOC in FY 2019. For surveillance, the package aviation component has evolved. Initially, the package was first upgraded with the MQ-8B Fire Scout, a vertical take-off unmanned aerial vehicle (VTUAV) used for finding and identifying surface contacts. In FY24, because of the MQ-8B sunset, the Fleet invested in a contractor owned/contractor operated Aerosonde. The MK 4.7 Aerosonde, a fixed-wing unmanned aircraft that provides long-endurance Intelligence, Surveillance, and Reconnaissance (ISR) and is proven reliable for both land and sea operations. In FY26, the ScanEagle unmanned aircraft was added as a compatible asset, allowing it to be interchanged with the Aerosonde based on mission requirements. The inventory objective of ten deployable SUW MP has been delivered to the Fleet. Fleet requirements for SSMM has been met with five (5) production assets. A SUW MP is considered deployable and capable of meeting its mission requirements on an LCS only when it includes the full complement of Common Mission Modules Equipment (Line Item Number 1600) and the mission systems composing the LCS SUW Mission Module (Line Item Number 1603). [P40A / SU001 - GUN MODULE]: The Gun Mission Module (GMM) comprises two high velocity 30mm cannons to augment the ship's 57mm gun, and embarked support aircraft (MH-60R/S helicopter with Hellfire missile) for the detection, identification, and classification of surface contacts. [P40A / Gun Module Modernization/Technology Refresh]: Procures modernized Gun Module Remote Control System (GMRCS) and Gun User Interface Device (GUID), each contain computational equipment (including critical MAGIC-1s and Maintenance Station laptops) that are end-of-life and can no longer be procured. The rugged small form factor MAGIC1 display computer combines state-of-the-art CPU technology with the latest graphics processing units (GPUs) to deliver unprecedented levels of performance for GMM video and non-video applications. LI 1603 - LCS SUW Mission Modules Navy UNCLASSIFIED Page 1 of 5 P-1 Line #32 Volume 1 - 591 === page 670 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 15: Other Ship Support ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1603 / LCS SUW Mission Modules Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 [P40A / SU002 - SURFACE-TO-SURFACE MISSILE MODULE (SSMM)]: The SSMM provides the LCS ship, the ability to prosecute sea-based and shore-based threats in the littorals using surface-to-surface missiles. The SSMM uses the Army's Longbow Hellfire missile, which is currently in DOW inventory. The SSMM consists of 24 Longbow Hellfire Missiles, 12 MK210 Launchers, and supporting hardware. When combined, the SSMM is a launcher system with self-contained technical fire control, electronics, and software for remote operations. The missile design is capable of engaging Fast Attack Craft/Fast In-shore Attack Craft (FAC /FIAC) threats, thereby, providing the LCS a standoff engagement capability. [P40A / SU003 - MARITIME SECURITY MODULE]: The Maritime Security Module (MSM) provides LCS with the capability to conduct Level II Visit, Board, Search and Seizure (VBSS) operations and the ability to conduct anti-piracy and maritime interdiction missions. This budget line procures hardware for a full MSM that includes two 11 meter Rigid Hull Inflatable Boats (RHIB), two boat cradles, a VBSS Allowance Equipment List (AEL) for communications and tactical equipment and support containers. Funding also includes production, assembly, installation and checkout of all mission system components. [P40A / SU004 - SUW MP Obsolete/Tech Refresh]: Funding provides the replacement of obsolete Commercial off-the-Shelf (COTS) that require modernization including heating, ventilation, and air conditioning (HVAC) components, air flow sensor, thermal couple, signal conditioner, Freon detector etc. FY27 plans include upgrade of existing hatch and cover to resolve outstanding deficiencies. The full complement of GMMs and MSMs, and 5 SSMMs that are in service will face major obsolescence and sparing challenges if not funded. [P40A / SU900 - CONSULTING SERVICES]: Provides program management support, engineering and technical support, studies, analysis and evaluation on mission module systems. LI 1603 - LCS SUW Mission Modules Navy UNCLASSIFIED Page 2 of 5 P-1 Line #32 Volume 1 - 592 === page 671 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 1603 / LCS SUW Mission Modules Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 15: Other Ship Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a LCS SUW Mission Packages - / 203.720 - / 11.101 - / 3.790 - / 1.719 P-40 Total Gross/Weapon System Cost - / 203.720 - / 11.101 - / 3.790 - / 1.719 - / - - / 1.719 / 0.000 - / 1.719 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: In FY 2027, funding is requested for Surface-To-Surface Missile Module (SSMM) and SUW MP Obsolescence/Tech Refresh. These efforts fund modernization, sparing, and obsolescence/tech refresh requirements that are necessary to continue deploying the Navy's SUW MPs with ten GMM, ten MSM, and five SSMM. LI 1603 - LCS SUW Mission Modules Navy UNCLASSIFIED Page 3 of 5 P-1 Line #32 Volume 1 - 593 === page 672 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1603 / LCS SUW Mission Modules Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: LCS SUW Mission Packages FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) SU001 - GUN MODULE 1.1) MK-50 Gun Module A 1.2) MK-46 Gun Weapon System A 1.3) Gun Module Modernization/ Technology Refresh A 1.4) PRODUCTION ENGINEERING SUPPORT A Subtotal: 1) SU001 - GUN MODULE 3,735K 18 67.224 - - - - - - - - - - - - - - - 2,936K 16 46.975 - - - - - - - - - - - - - - - - - 8.300 - - 4.100 - - - - - - - - - - - - - - 11.754 - - - - - - - - - - - - - - - - - 134.253 - - 4.100 - - - - - - - - - - - - 25.794 - - - - - - - - - - - - - - - 10.635 - - 3.400 - - 1.700 - - - - - - - - - 6.160 - - - - - - - - - - - - - - - 2) SU002 - SURFACE-TO-SURFACE MISSILE MODULE (SSMM) 2.1) SURFACE-TOSURFACE MISSILE MODULE A (1) A 2.3) SSMM Launcher A 2.2) SSMM ECPs Sets (2) 2.4) PRODUCTION ENGINEERING A 5,159K - 5 - 1,232K 5 - - 5.863 - - - - - - - - - - - - - - - - - 48.452 - - 3.400 - - 1.700 - - - - - - - - - 1,125K 10 11.250 - - - - - - - - - - - - - - - - - 2.002 - - - - - - - - - - - - - - - - - 13.252 - - - - - - - - - - - - - - - - - 2.483 - - 3.601 - - 1.922 - - 1.568 - - - - - 1.568 - - 2.483 - - 3.601 - - 1.922 - - 1.568 - - - - - 1.568 - - 5.280 - - - - - 0.168 - - 0.151 - - - - - 0.151 Subtotal: 5) SU900 - CONSULTING SERVICES - - 5.280 - - - - - 0.168 - - 0.151 - - - - - 0.151 Total - - 203.720 - - 11.101 - - 3.790 - - 1.719 - - - - - 1.719 SUPPORT (3) Subtotal: 2) SU002 - SURFACE-TOSURFACE MISSILE MODULE (SSMM) 3) SU003 - MARITIME SECURITY MODULE 3.1) MARITIME SECURITY MODULE A 3.2) PRODUCTION ENGINEERING A Subtotal: 3) SU003 - MARITIME SECURITY MODULE 4) SU004 - SUW MP Obsolete/Tech Refresh 4.1) Obsolescence and Technology Refresh A (4) Subtotal: 4) SU004 - SUW MP Obsolete/Tech Refresh 5) SU900 - CONSULTING SERVICES 5.1) CONSULTING SERVICES A LI 1603 - LCS SUW Mission Modules Navy UNCLASSIFIED Page 4 of 5 P-1 Line #32 Volume 1 - 594 === page 673 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 P-1 Line Item Number / Title: 1603 / LCS SUW Mission Modules Aggregated Items Title: LCS SUW Mission Packages Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (1) (2) (3) (4) Engineering Change Proposals (ECPs) support SSMM producibility changes in line with unit production. The decrease from FY26 to FY27 marks the completion of SSMM ECPs One SSMM Launcher Set comprises 12 MK 210 Missile Launchers. Production Engineering is required in all years of SSMM procurement as well as 24 months after procurement to fund factory acceptance testing in year of delivery. FY27 Plans include upgrade of existing hatch and cover to resolve outstanding deficiencies LI 1603 - LCS SUW Mission Modules Navy UNCLASSIFIED Page 5 of 5 P-1 Line #32 Volume 1 - 595 === page 674 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 596 === page 675 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 15: Other Ship Support ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization Program Elements for Code B Items: N/A Other Related Program Elements: 0603581N Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 646.070 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 646.070 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 646.070 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 188.254 188.254 188.254 189.458 189.458 189.458 315.272 - 0.000 - 315.272 - 0.000 - 315.272 0.000 315.272 315.272 315.272 330.883 330.883 330.883 265.337 265.337 265.337 279.241 279.241 279.241 To FY 2031 Complete 277.495 Continuing 277.495 Total - Continuing Continuing - Continuing - - Continuing Continuing 3.867 Continuing Continuing 277.495 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - 12.101 10.607 4.165 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Modernization/maintenance efforts support Littoral Combat Ship (LCS) requirements to remain operational and meet mission needs. This line provides funding for ship changes and improvements related to mandatory safety, cyber security remediation, habitability, obsolescence, reliability, command and control, and communication modifications to maintain LCS operational availability and achieve ships' expected service life. Funding covers planned CNO availabilities and two years of planning costs and long lead time materials (LLTM) in advance of CNO availabilities. This line provides funds for the procurement, planning, installation design, and installation for Lethality and Survivability (L&S) modifications for both LCS variants (Independence and Freedom). L&S modifications seek to leverage existing Navy Program of Record systems allowing for more rapid implementation of holistic combat system enhancements. These modifications will improve displays, infrastructure, radar, tactical data link, cybersecurity, and navigation capabilities. L&S introduces commonality between LCS variants and other surface combatants leveraging common source libraries, Total Ship Computing Environment (TSCE), MK-20 Electro-Optical Surveillance System, Surface Electronic Warfare Improvement Program, Nulka, MK-160 Gun Computer System, Data Links (IND only), Mode 5 IFF (IND only) and Navigation systems. The use of Navy Standard systems improves capability, simplifies training, and decreases life cycle costs. MT002 - LCS Class Design Improvements This budget line covers the procurement and installation of a Combat Systems and C4I Condition Based Maintenance (CBM) System, designed to monitor and collect maintenance data then periodically transfer the data ashore via a Virtualized Data Transport System (VDTS) for analysis. The CBM equipment currently monitors performance of SPS-75 and SPS-77 Radars, MK-49 RAM, and MK-110 Gun, but the Program Office is researching the potential for other systems to be monitored. MT003 - LCS Maintenance Modernization This budget line funds back-fit, upgrade, and fact of life obsolescence changes on both Freedom and Independence Variant Littoral Combat Ships. The Modernization construct is split out into 7 categories: Safety; Targeted Performance Enhancement; Obsolescence; Advanced Engineering Control System (AECS); Communication; Hull, Mechanical and Electrical (HM&E); and Navigation. These categories enable improved planning and tracking of ship changes as technology and mission evolve. The scope/requirements for maintenance modernization is dependent on hull availability, applicability, procurement timeline, and ship alteration maturity. MT004 LCS Lethality and Survivability Lethality and Survivability (L&S) funding provides for hardware procurement and installation of a common Combat Management System (CMS) comprised of Government Furnished Equipment (GFE), associated technical support data to upgrade existing contractor furnished equipment, and associated cybersecurity modifications that are back-fit onboard in-service LCS platforms. Funding also provides the non-recurring engineering development technical data packages and hardware and software packages necessary to integrate and test the common software baseline for LCS Class variants. Production and planning support LI 1604 - LCS In-Service Modernization Navy UNCLASSIFIED Page 1 of 28 P-1 Line #33 Volume 1 - 597 === page 676 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 15: Other Ship Support ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization Program Elements for Code B Items: N/A Other Related Program Elements: 0603581N Line Item MDAP/MAIS Code: N/A services for these upgrades are phased over a three (3) year span starting two (2) years prior to installation on a per hull basis, with installation accomplished during planned CNO Availabilities. L&S upgrades the following systems to GFE resulting in one combat system baseline with: Combat Management System: Gun (MK-20 Electro-Optical Surveillance System and Mk-160 Gun Fire Control System), Electronic Warfare Suite (Surface Electronic Warfare Improvement Program and MK-53 Nulka Decoy Launching System), Data Links (C2P), Mode 5 IFF (IFF AN/UPX-46), and Navigation Suite (NCDS, WSN-7/12, WSN-9, GPNTS, and ADAP). MT005 LCS Combat System Modernization Modernization of LCS Combat System hardware and software occurs through development and procurement of Engineering Change Proposals (ECPs) and associated Ship Change Documents (SCDs) not addressed by Lethality and Survivability (L&S) upgrades. CS Modernization covers obsolescence/diminishing manufacturing shortages, improved system performance, safety, cyber security, and the procurement of specialized test equipment. Procures initial outfitting spares for critical systems and subsystems unique to LCS class ships. Increases material availability, decreases maintenance turn-around times, and increases Operational Availability (Ao) at lower replacement costs. The official schedule for CNO Availabilities is maintained in the NDE and updated by Commander Naval Surface Force Atlantic and Pacific schedulers. The CNO approved schedule for LCS Availabilities included in the requirements is as follows (as of 11 MARCH 2026): CNO avails awards: FY25: LCS 10, 12, 14, 28 FY26: LCS 13, 19, 22, 34 FY27: LCS 6, 8, 15, 16, 20, 21, 23, 30 FY28: LCS 13, 17, 18, 24, 25, 27, 32 FY29: LCS 12, 14, 19, 26, 29, 36 FY30: LCS 6, 10, 15, 16, 18, 21, 23, 30, 31, 34, 38 FY31: LCS 8, 17, 22, 24, 25, 26, 27, 28, 32 Each ship requires different alteration packages that vary in scope and cost based on individual ship configurations. Therefore, funding requested for availabilities does not reflect a standard cost per availability, but funds required work for each specific hull. Note: Due to contract award dates, funds for install are awarded approximately 120 days prior to the start of the availability, meaning availabilities that start within the first quarter of a FY are awarded in the prior FY. [P3A / LCS Maintenance Modernization]: Increased FY27 per unit costs for Advanced Machinery Control System (AMCS) (7.1.1) represents start-up/ non-recurring engineering costs for hardware and software development of the AMCS system to support AMCS installation on Freedom class LCS ships commencing in FY30. AMCS is critical in the operations of ships' HM&E systems and maintaining Operational Availability. LI 1604 - LCS In-Service Modernization Navy UNCLASSIFIED Page 2 of 28 P-1 Line #33 Volume 1 - 598 === page 677 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 15: Other Ship Support ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization Program Elements for Code B Items: N/A Other Related Program Elements: 0603581N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a LCS In-Service Modernization - / 134.203 P-3a 1 / LCS Maintenance Modernization (TBD) - / 335.033 P-3a 2 / Combat System Lethality & Survivability Upgrades (TBD) - / 176.834 - / 75.658 P-40 Total Gross/Weapon System Cost - / 646.070 - / 188.254 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code - / 8.206 - / 104.390 - / 9.695 - / 18.050 / - - / 18.050 / 151.004 - / 141.713 - / 0.000 - / 141.713 - / 28.759 - / 155.509 - / 0.000 - / 155.509 - / 189.458 - / 315.272 - / 0.000 - / 315.272 - - FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a LCS In-Service Modernization P-3a 1 / LCS Maintenance Modernization (TBD) - - / 133.007 / - - / 95.736 / - - / 104.439 / - - / 100.461 / - - P-3a 2 / Combat System Lethality & Survivability Upgrades (TBD) - / 179.746 - / 157.910 - / 160.949 - / 162.907 Continuing Continuing P-40 Total Gross/Weapon System Cost - / 330.883 - / 265.337 - / 279.241 - / 277.495 Continuing Continuing - / / 38.096 - / - / 1,203.879 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding for LCS In-Service Modernization continues essential support for LCS operational readiness through modernization of critical systems such as the Total Ship Computing Environment (TSCE), increased ability for organic repair and reduced reliance on Original Equipment Manufacturer contracts by shifting to Government Furnished Equipment (GFE) for major systems, and expanded mission capabilities through lethality and survivability upgrades. MT002 - LCS Class Design Improvements No Congressional increases at this time. MT003 - LCS Maintenance Modernization Littoral Combat Ships (LCS) Maintenance Modernization funds the back-fit, upgrade, and fact of life obsolescence changes on Littoral Combat Ships. The Modernization construct in FY27 is split out into 7 total categories: Safety, Targeted Performance Enhancement, Obsolescence, AECS, Communication, HM&E and Navigation. For Safety, the program office is planning 6 procurements and 6 installs. The total planned FY27 procurement cost in support of future Modernization is $3.142M, and will cover avails for LCS 12, 14, 17, 26, 27, and 36. The total planned installation cost for FY27 Modernization is $1.157M, and will cover avails for LCS 6, 8, 16, 21, and 23. Safety procurements and installs include Man Overboard Indicator (MOBI) System, Horizon Reference Set (HRS), CANMAN Steering Tiller Cable Re-Route, Tug Impact Reinforcement Modification. For Targeted Performance Enhancement, the program office is planning 41 procurements and 57 installs. The total planned FY27 procurement cost in support of future Modernization is $10.142M, and will cover avails for LCS 14, 17, 18, 24, 25, 26, 27, 29, and 32. The total planned installation cost for FY27 Modernization is $11.018M, and will cover avails for LCS 6, 8, 15, 16, 20, 21, 23, and 30. LI 1604 - LCS In-Service Modernization Navy UNCLASSIFIED Page 3 of 28 P-1 Line #33 Volume 1 - 599 === page 678 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 15: Other Ship Support ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization Program Elements for Code B Items: N/A Other Related Program Elements: 0603581N Line Item MDAP/MAIS Code: N/A Targeted Performance Enhancement procurements and installs include Launch Handling and Recovery System (LRHS), HM&E Zonal UPS, Electric Plant Control Power Redundancy, Ship Service Diesel Generator (SSDG) Sea Water Ingestion, Waterjet Hydraulic Power Unit (HPU) upgrades, Twin Boom Extensible Crane (TBEC) upgrades, Stern Tube Seal Flowmeter, Heat Exchanger upgrades, GT and Main Propulsion Diesel Engine (MPDE) Local Interlock, Main reduction Gear (MRG) Dehumidifier and Lube Oil Coolers, and SPS-77. For Obsolescence, the program office is planning 9 procurements and 11 installs. The total planned FY27 procurement cost in support of future Modernization is $1.796M, and will cover avails for LCS 6, 8, 12, 14, 26, 36, and 38. The total planned installation cost for FY27 Modernization is $2.158M, and will cover avails for LCS 6, 8, 16, 20, and 30. Obsolescence procurements and installs include Video Display System (VDS) upgrades, Voyage Data Recorder (HW/SW) Installation and Fathometer. For AECS (Advanced Engineering Control System) / MPCMS (Machinery Plant Control and Monitoring System), the program office is planning 12 procurements and 11 installs. The total planned FY27 procurement cost in support of future Modernization is $19.840M, and will cover avails for LCS 12, 14, 17, 25, and 27. The total planned installation cost for FY27 Modernization is $4.528M and will cover avails for LCS 15, 20, 21, and 23. AECS procurement and installs include Engineering Control Systems upgrades, Fire Detection System modernization, LCS 2 Variant Advanced Damage Control System (ADCS) software, LCS 1 Variant ADCS Software Upgrade, and LCS Quarterdeck Panel Replacement, AMCS GFE Solution Hardware Replacement. For Communication, the program office is planning 51 procurements and 98 installs. The total planned FY27 procurement cost in support of future Modernization is $15.224M, and will cover avails for LCS 6, 8, 12, 15, 17, 18, 19, 24, 25, 27, 32, and 36. The total planned installation cost for FY27 Modernization is $29.916M, and will cover avails for LCS 6, 8, 10, 12, 15, 16, 19, 20, 21, 22, 23, 26, 28, 30, 31, 36, and 38. Communication procurements and installs include Total Ship Computing Environment (TSCE) upgrades, TSCE Hosted Application Server Creation, TSCE Migration to Windows 11, TSCE Obsolescence Network Upgrade, TSCE Common Computing Environment HW/SW, TSCE Laptop Increase, External Crypto Modernization, Voice Over Secure IP (VOSIP) Phones, Integrated Voice Communications System (IVCS), CENTRIXS-M FAK Infrastructure, AN/SPS-77(V)2 Radar upgrades, Command and Control (C2P) upgrades, Multi-Data Link Management System upgrade, AC2 Modem upgrades, Virtualized Data Transport System (VDTS), Total Common Data Link Management & Control (TCDL M&C), Red Hat Enterprise Linux (RHEL) Software Upgrade, SIPRNET Hosted Application Server, and TMIP Printer Obsolescence. For HM&E (Hull, Mechanical, and Electrical), the program office is planning 63 procurements and 70 installs. The total planned FY27 procurement cost in support of future Modernization is $13.815M, and will cover avails for LCS 13, 14, 15, 17, 18, 19, 24, 25, 26, 27, 29, and 36. The total planned installation cost for FY27 Modernization is $23.261M, and will cover avails for LCS 6, 8, 15, 16, 19, 20, 21, 23, and 30. HM&E procurement and installs include Damage Control Local Operating Panel (DCLOP) Tech Refresh, Load Shed Modifications, Rosebox Strainer Material Replacement, Tank BHD 20 and 70 Mods and 03 LVL Stanchion Brackets, Replacement Air Conditioning Plant Chill Water Pumps, LCS Aux 5 Tank Top Pitting Modernization, Ground Detect Monitoring, Bulkhead 90 Manholes, Flight Deck Insert & Fatigue Improvements, Structural Fire Protection Material Change, Electrical Outlet Installations, HAZMAT Stowage Risk Mitigation, Replacement Transducers, Launch Handling and Recovery System (LRHS) LCS 5 AF upgrades , Main Propulsion Diesel Engine (MPDE) Air Cooler Diffuser Replacement and Local Control Panel Touchscreen Upgrade, MPAC Ventilation - Cooling, Full Authority Digital Control (FADC) Engine Monitoring Unit (EMU) , Shock Qualified Composite Grating and Clips, Starboard Exhaust Silencer Heat Transfer Mitigation, Composite Ready Service Locker Sunshields, GT Main Reduction Gear Lube Oil Baffle Plate, MPCMS Software Update, NAVDDS Tech Refresh, AC Plant Condenser Upgrades, TI-25 Enterprise Remote Monitoring (ERM) Hardware, Software Upgrade to Enable Dead Bus Capabilities, Installation of Replacement Transducers, and Shock Qualified Composite Grating and Clips. For Navigation, the program office is planning 8 procurements and 20 installs. The total planned FY27 procurement cost in support of future Modernization is $1.244M, and will cover avails for LCS 14, 17, 25, 27, and 29. The total planned installation cost for FY27 Modernization is $4.472M, and will cover avails for LCS 6, 8, 10, 15, 16, 20, 21, 23, and 28. MT004/MTINS LCS Lethality and Survivability FY27 controls support completing LCS 10 L&S shipboard testing and CSSQT execution; LCS 28 L&S ship installation, testing, CSSQT planning; LCS 20 L&S ship installation; and LCS 12 procurement of long lead time material and end items. LI 1604 - LCS In-Service Modernization Navy UNCLASSIFIED Page 4 of 28 P-1 Line #33 Volume 1 - 600 === page 679 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 15: Other Ship Support ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization Program Elements for Code B Items: N/A Other Related Program Elements: 0603581N Line Item MDAP/MAIS Code: N/A Changes from PB26 to PB27: Decrease from PB26 to PB27 requests reflect a reduction in FY27 procurements from 3 to 1, offset by an increase in FY27 installations from 0 to 1. These changes are driven by rephased fielding plan, shifting to 1 procurement and 1 installation per year starting in FY27, and account for increased unit end item procurement costs. Updated the end items to reflect current nomenclature and full list of systems being installed as part of L&S. Notable additions include Navigation Suite (NCDS, WSN-7/12, WSN-9, GPNTS, and ADAP). FY27 funding ensures ability to field L&S in accordance with updated fielding plan. LCS Combat System L&S Procurement and Installation Schedule: FY24: Procure QTY 2 (2 IND/0 FRE); Install QTY 1 (1 IND/0 FRE) FY25: Procure QTY 1 (1 IND/0 FRE); Install QTY 1 (1 IND/0 FRE) FY26: Procure QTY 0 (0 IND/0 FRE); Install QTY 1 (1 IND/0 FRE) FY27: Procure QTY 1 (1 IND/0 FRE); Install QTY 1 (1 IND/0 FRE) FY28: Procure QTY 1 (1 IND/0 FRE); Install QTY 1 (1 IND/0 FRE) FY29: Procure QTY 1 (1 IND/0 FRE); Install QTY 1 (1 IND/0 FRE) FY30: Procure QTY 1 (1 IND/0 FRE); Install QTY 1 (1 IND/0 FRE) FY31: Procure QTY 1 (1 IND/0 FRE); Install QTY 1 (1 IND/0 FRE) MT005 LCS Combat System Modernization FY2027 funding for modernization of LCS Ships that have not received Lethality and Survivability modernization. Funds will develop and procure Combat System hardware, software and logistics documentation required for both LCS variants to maintain combat effectiveness and deployment readiness. Funds also provide for procurement, development, and execution of several Ship Change Documents that address increasing rate of obsolescence and diminishing manufacturing shortages of various contractor furnished equipment systems not addressed by the Lethality and Survivability modernization. Navigation procurement and installs include Voyage Data Recorder (VDR) SW/HW Upgrade. LI 1604 - LCS In-Service Modernization Navy UNCLASSIFIED Page 5 of 28 P-1 Line #33 Volume 1 - 601 === page 680 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: LCS In-Service Modernization FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) MT002 LCS Class Design Improvements 1.1) FY18 Congressional Add - OTH, IFF Mode 5, BLOS, LWEC A 1.2) Congressional Add Combat and Comms System Acceleration A 1.3) FY23 Congressional Add LCS 3 A - - 84.000 - - - - - - - - - - - - - - - - - 36.000 - - - - - - - - - - - - - - - - - 13.000 - - - - - - - - - - - - - - - - - 133.000 - - - - - - - - - - - - - - - - - 1.203 - - - - - - - - - - - - - - - - - 1.203 - - - - - - - - - - - - - - - - - - - - 8.206 - - 9.695 - - 18.050 - - - - - 18.050 Subtotal: 4) MT005 LCS Combat System Modernization - - 0.000 - - 8.206 - - 9.695 - - 18.050 - - - - - 18.050 Total - - 134.203 - - 8.206 - - 9.695 - - 18.050 - - - - - 18.050 Subtotal: 1) MT002 LCS Class Design Improvements 3) MT004 Lethality and Survivability 3.1) Lethality and Survivability AIT & Shipboard Qualification A Subtotal: 3) MT004 Lethality and Survivability 4) MT005 LCS Combat System Modernization 4.1) LCS Combat System Modernization A (1) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (1) LI 1604 - LCS In-Service Modernization Navy UNCLASSIFIED Page 6 of 28 P-1 Line #33 Volume 1 - 602 === page 681 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 335.033 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 335.033 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / LCS Maintenance Modernization 335.033 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 104.390 104.390 104.390 151.004 151.004 151.004 141.713 - 0.000 - 141.713 - 0.000 - 141.713 0.000 141.713 141.713 141.713 133.007 133.007 133.007 95.736 95.736 95.736 104.439 104.439 104.439 To FY 2031 Complete 100.461 100.461 100.461 Total 38.096 1,203.879 38.096 1,203.879 38.096 1,203.879 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: LCS Maintenance Modernization The Modernization construct is split into 7 different categories: Safety, Targeted Performance Enhancements, Obsolescence, AECS, C4I, HM&E Navigation. These categories enable improved planning and tracking of ship changes as technology and mission evolve. Safety Category: Man Overboard Identification (MOBI) (IND and FRE) CANMAN Steering Tiller Cable Re-Route (FRE) Horizon Reference Set (HRS) (IND and FRE) Targeted Performance Enhancements Category: SPS-77 Mod B+ Transient Voltage Surge Suppressor (TVSS) (IND) Stern Door Lockpin Proximity Switch (IND) Main Reduction Gear (MRG) Lube Oil Coolers Fresh Water (FW) Lay Up (IND) Twin Boom Extensible Crane (TBEC) Human Machine Interface (HMI) Screen (IND) Stern Tube Flowmeter (IND) MRG Dehumidifier (IND) SmartPac Heat Exchangers FW Lay up (IND) Hydraulic Prime Mover Heat Exchanger (FW) Lay Up (IND) Vital and Non-Vital Generator Heat Exchangers FW Lay Up (IND) Chiller Plant Condensers FW Lay up (IND) Main Propulsion Diesel Engine (MPDE) Power Pack Heat Exchanger FW Lay Up (IND) GT Power Pack Heat Exchanger FW Lay Up (IND) TBEC Modification (IND) Electric Plant Control Power Redundancy (FRE) LI 1604 - LCS In-Service Modernization Navy UNCLASSIFIED Page 7 of 28 P-1 Line #33 Volume 1 - 603 === page 682 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / LCS Maintenance Modernization MDAP/MAIS Code: Ship Service Diesel Generator (SSDG) Sea Water Ingestion (FRE) HM&E Zonal UPS (FRE) Hydraulic Power Unit (HPU) Oil Cooler Backfit (FRE) Launch, Recovery and Handling System (LRHS) Extend in Normal Mode (FRE) GT/MPDE Start Permissives (FRE) Launch, Recovery, and Handling System (LRHS) Reliability HW (FRE) Launch, Recovery, and Handling System (LRHS) Reliability SW (FRE) Waterjet HPU Cooling Control Temp (FRE) Single Board Computer (FRE) TBEC Tagline Winches 3&4 Water Shield (IND) TBEC Soft-Start Manifold Redesign) (IND) Obsolescence Category: LCS Camera Video Display System (VDS) SW Upgrade (IND) LCS VDS Obsolete Hardware (HW) (IND) GFE Fathometer UQN-10 (IND and FRE) AECS/MPCMS Category: AECS HW Tech Refresh (IND) AECS SW Tech Refresh (IND) MPCMS GFE Solution Hardware Replacement (FRE) MPCMS GFE Solution Software Upgrade (FRE) ADCS Software (IND) Fire Detection System modernization (IND) Communications Category: Multi Data Link Management System (MDLMS) Operating System (OS) SW Upgrade (IND) Combined Enterprise Regional Information Exchange System (CENTRIXS) Fly Away Kit (FAK) (IND and FRE) Total Ship Computing Environment (TSCE) Hosted Application Server (FRE) TSCE Defense Information System Agency (DISA) Endpoint Security (FRE) TSCE IND Back Up SW Upgrade (IND) TSCE HW Update for Theatre Medical Information Program (TMIP) (FRE) External CRYPTO Modernization (IND and FRE) Command and Control Processor (C2P) TECH REFRESH (IND and FRE) TSCE Obsolescence Network Hardware Upgrade (IND and FRE) TSCE Obsolescence Network Software Upgrade (IND and FRE) TSCE Migration to Windows 11 OS (IND and FRE) SIPRNET Hosted Application Server (FRE and IND) TSCE 05.XX SW Tech Refresh (FRE) TSCE Laptop Increase (FRE and IND) AC2 Modem Upgrade (IND and FRE) LI 1604 - LCS In-Service Modernization Navy UNCLASSIFIED Page 8 of 28 P-1 Line #33 Volume 1 - 604 === page 683 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / LCS Maintenance Modernization MDAP/MAIS Code: Environmental Sensor Upgrade (IND) IVCS Firmware Upgrade (IND) IVS HW laptop Upgrade (IND) IVCS SW Laptop Upgrade (IND) CBM Dashboard (SW) CBM Dashboard (HW) HM&E Category: Load Shed Modifications (IND) Rosebox Strainer Material (IND) Replace Air Conditioner (AC) Chill Water (CW) Pumps (IND) LCS Aux 5 Tank Top Pitting (IND) Ground Detect Monitoring (IND) Bulkhead 90 Amah Manholes (IND) LCS 2 Variant Composite Ready Service Locker (RSL) (IND) Structural fire Protection Material Change (IND) Medium Pressure Air Compressor (MPAC) Ventilation - Cooling (FRE) Installation of Replacement Transducers (FRE) Starboard Exhaust Silencer Heat Transfer Mitigation (FRE) MPDE Air Cooler Diffuser Replacement (FRE) Variant Composite Ready Service Locker Sunshields (FRE) Shock Qualified Composite Grating and Clips (FRE) LRHS Human Machine Interface (HMI) (FRE) HAZMAT Stowage Risk Mitigation (FRE) AFT Damage Control Local Operating Panel (IND) Flight Deck insert & Fatigue Improvements at hanger door (IND) Electrical Outlet Install in Electrical Tool Room (IND) NAVDDS Tech Refresh (FRE) Software Upgrade to Enable Dead Bus Capabilities (FRE) eRM MPCMS Software Update (FRE) Navigation Category: Integrated Bridge System (IBS) (IND) Voyage Data Recorder (VDR) Software Installation (FRE and IND) Voyage Data Recorder (VDR) Hardware Installation (FRE and IND) The official schedule for CNO Availabilities is maintained in the NDE and updated by Commander Naval Surface Force Atlantic and Pacific schedulers. The CNO approved schedule for LCS Availabilities included in the requirements is as follows (as of 11 March 2026): CNO avails awards: FY25: LCS 10, 12, 14, 28 FY26: LCS 13, 19, 22, 34 LI 1604 - LCS In-Service Modernization Navy UNCLASSIFIED Page 9 of 28 P-1 Line #33 Volume 1 - 605 === page 684 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / LCS Maintenance Modernization MDAP/MAIS Code: FY27: LCS 6, 8, 15, 16, 20, 21, 23, 30 FY28: LCS 13, 17, 18, 24, 25, 27, 32 FY29: LCS 12, 14, 19, 26, 29, 36 FY30: LCS 6, 10, 15, 16, 18, 21, 23, 30, 31, 34, 38 FY31: LCS 8, 17, 22, 24, 25, 26, 27, 28, 32 Each ship requires different alteration packages that vary in scope and cost based on individual ship configurations. Therefore, funding requested for availabilities does not reflect a standard cost per availability, but funds required work for each specific hull. Note: Due to contract award dates, funds for install are awarded approximately 120 days prior to the start of the availability, meaning availabilities that start within the first quarter of a FY are awarded in the prior FY. LI 1604 - LCS In-Service Modernization Navy UNCLASSIFIED Page 10 of 28 P-1 Line #33 Volume 1 - 606 === page 685 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / LCS Maintenance Modernization MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan (*) Indicates the modification is being installed organically and no installation funds are required. FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement 1.1.1) LCS Freedom Maintenance Modernization - NonOrganic Installation 1 of 9 2.1.1) Enacted Rescissions - Organic - (*) 3.1.1) LCS Independence Maintenance Modernization (2) 3 / 0.765 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 0.765 / 35.634 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 9 / 2.814 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 9 / 2.814 - / 35.634 NonOrganic Installation 2 of 9 4.1.1) Safety - NonOrganic Installation 3 of 9 5.1.1) Targeted Performance Enhancement - NonOrganic Installation 4 of 9 6.1.1) Obsolescence - NonOrganic Installation 5 of 9 7.1.1) AECS/AMCS - NonOrganic Installation 6 of 9 / 0.884 11 / 2.654 6 / 3.142 - / - 6 / 3.142 10 / 5.738 4 / 2.168 8 / 6.198 2 / 2.098 - / - 41 / 44.498 - / 57.834 9 / 5.263 67 / 17.469 41 / 10.142 - / - 41 / 10.142 37 / 5.687 16 / 2.762 24 / 2.654 2 / 0.607 - / - 196 / 102.418 / 3.602 10 / 0.808 8 / 1.932 9 / 1.796 - / - 9 / 1.796 6 / 1.873 7 / 1.284 9 / 2.205 2 / 0.901 - / - 51 / 14.401 - / 17.315 4 / 23.148 14 / 17.162 12 / 19.840 - / - 12 / 19.840 14 / 16.937 8 / 6.982 10 / 12.414 26 / 51.365 - / - 88 / 165.163 - / 76.032 49 / 14.791 101 / 47.365 51 / 15.224 - / - 51 / 15.224 46 / 20.845 28 / 11.776 28 / 19.989 6 / 2.492 - / - 309 / 208.514 - / 19.072 20 / 9.671 84 / 20.963 63 / 13.815 - / - 63 / 13.815 39 / 10.643 22 / 4.135 4 / 0.897 1 / 0.093 - / - 233 / 79.289 - / 0.545 6 / 25.945 30 / 2.888 8 / 1.244 - / - 8 / 1.244 8 / 32.455 6 / 1.099 12 / 1.232 / 0.834 - / - 70 / 66.242 - / 7.058 - - (5) (6) (7) 10.1.1) Navigation - NonOrganic Installation 9 of 9 / 21.616 (4) 8.1.1) Communication - NonOrganic Installation 7 of 9 9.1.1) HM&E - NonOrganic Installation 8 of 9 (3) - (8) (*) 11.1.1) Combat Systems - NonOrganic Subtotal: Procurement / 242.287 - - - / - / 80.510 - - / - / - - / - / 65.203 - / - / - - / - - / - - / - - / - - / - - - / - - / - - / - - / - - / - - / 110.433 - - - / - / 65.203 - - / - / 94.178 - - / - / 30.206 - - / - / 45.589 - - / - - / - - / 7.058 / 58.390 - / 0.000 / - - / - - / 0.000 - / 19.740 / - - / - - / 0.000 - / 94.085 - / 726.796 - Installation Installation 1 of 9: GRP: LCS Freedom Maintenance Modernization Non-Organic Inst. 1 of 2 - / 19.740 Installation 2 of 9: GRP: LCS Independence Maintenance Modernization Non-Organic Inst. 2 of 2 - / 73.006 - / - - / 18.232 - / 2.847 Installation 3 of 9: GRP: Safety - / - - / - - / 0.185 Installation 4 of 9: GRP: Targeted Performance Enhancements - / - - / - - / 3.706 Installation 5 of 9: GRP: Obsolescense - / - - / - - / 2.422 Installation 6 of 9: GRP: AECS/MPCMS - / - - / - - / 4.266 Installation 7 of 9: GRP: Communications - / - Installation 8 of 9: GRP: HM&E - / - LI 1604 - LCS In-Service Modernization Navy - / 5.648 - / - - - / 1.157 - / 0.000 / 11.018 - / 0.000 - / 2.158 - / 0.000 - / 4.528 - / 0.000 - - / 1.157 - / 2.787 - / 5.453 - / 4.582 - / 5.953 - / 2.274 - / 22.391 / 11.018 - / 8.437 - / 6.828 - / 3.287 - / 4.754 - / 0.254 - / 38.284 - / 2.158 - / 1.759 - / 4.293 / 1.901 - / 19.628 - / 4.528 - / 0.568 - / 8.424 - / 14.058 - / 10.620 / 22.438 - - / 9.529 - / 16.278 - / 17.953 - / 15.800 - / 2.469 / 14.638 - / 17.201 / 0.400 - / 0.136 - / 18.018 - / 29.916 - / 0.000 - / 29.916 / 8.279 - / 23.261 - / 0.000 - / 23.261 UNCLASSIFIED Page 11 of 28 - P-1 Line #33 - - / 3.882 / 9.782 - - / 3.213 - - / 64.902 / 115.611 - / 73.697 Volume 1 - 607 === page 686 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan (*) Indicates the modification is being installed organically and no installation funds are required. FY 2025 FY 2026 Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Installation 9 of 9: GRP: Navigation Subtotal: Installation Modification Number / Title: 1 / LCS Maintenance Modernization - / - / 92.746 - / - / 23.880 - / 0.848 / 40.571 - / 4.472 / 76.510 - / 0.000 / - - - / 4.472 / 76.510 - / 1.111 / 38.829 - / 7.053 / 65.530 - / 5.306 / 58.850 - / 1.331 / 42.071 - / 8.624 / 38.096 - / 28.745 / 477.083 Total Total Cost (Procurement + Support + Installation) LI 1604 - LCS In-Service Modernization Navy 335.033 104.390 151.004 141.713 0.000 UNCLASSIFIED Page 12 of 28 141.713 133.007 95.736 P-1 Line #33 104.439 100.461 38.096 1,203.879 Volume 1 - 608 === page 687 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / LCS Maintenance Modernization MDAP/MAIS Code: Installation 1 of 9: GRP: LCS Freedom Maintenance Modernization Non-Organic Inst. 1 of 2 Manufacturer Information Manufacturer Name: VARIOUS Manufacturer Location: Various Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Nov 2024 Nov 2025 Nov 2026 Nov 2027 Nov 2028 Nov 2029 FY 2031 Delivery Dates Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Installation Information Method of Implementation: Method:: Installation Name: LCS Freedom Maintenance Modernization Non-Organic Inst. 1 of 2 Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 3 / 19.740 Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 3 / 19.740 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 19.740 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 3 / 19.740 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 3 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3 Out 2 - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3 1 LI 1604 - LCS In-Service Modernization Navy UNCLASSIFIED Page 13 of 28 P-1 Line #33 Volume 1 - 609 === page 688 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / LCS Maintenance Modernization MDAP/MAIS Code: Installation 2 of 9: GRP: LCS Independence Maintenance Modernization Non-Organic Inst. 2 of 2 Manufacturer Information Manufacturer Name: VARIOUS Manufacturer Location: VARIOUS Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Nov 2024 Nov 2025 Nov 2026 Nov 2027 Nov 2028 Nov 2029 FY 2031 Delivery Dates Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Installation Information Method of Implementation: Method:: Installation Name: LCS Independence Maintenance Modernization Non-Organic Inst. 2 of 2 Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 9 / 73.006 0 / 18.232 9 / 94.085 Prior Years 0 / 2.847 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 2.847 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 Total 9 / 73.006 0 / 18.232 9 / 94.085 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 9 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 9 Out 6 - - - - - - - - - - - - - - - - - - - - - - - - - - 9 2 LI 1604 - LCS In-Service Modernization Navy - 1 UNCLASSIFIED Page 14 of 28 P-1 Line #33 Volume 1 - 610 === page 689 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / LCS Maintenance Modernization MDAP/MAIS Code: Installation 3 of 9: GRP: Safety Manufacturer Information Manufacturer Name: VARIOUS Manufacturer Location: VARIOUS Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Nov 2024 Nov 2025 Nov 2026 Nov 2027 Nov 2028 Nov 2029 FY 2031 Delivery Dates Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Installation Information Method of Implementation: Method:: Installation Name: Safety Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - 1 / 0.185 6 / 1.157 0 / 0.000 6 / 1.157 4 / 1.699 - / - - / - - / - 0 / 0.000 FY 2027 - / - - / - - / - - / - - / - - / - 2 / 0.384 4 / 2.869 - / - - / - 0 / 0.000 6 / 3.253 FY 2028 - / - - / - - / - - / - - / - - / - 1 / 0.704 5 / 2.584 4 / 2.922 - / - 0 / 0.000 10 / 6.210 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 3 / 1.660 1 / 0.744 0 / 0.000 4 / 2.404 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / 5.209 1 / 0.758 8 / 5.967 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 1.516 2 / 1.516 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - - / - 1 / 0.185 Installation Cost 6 / 1.157 0 / 0.000 6 / 1.157 7 / 2.787 9 / 5.453 7 / 4.582 8 / 5.953 11 / 3.041 / - - 3 / 2.274 / - 41 / 22.391 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - 1 - 3 1 - 2 - 4 - 3 1 1 5 2 1 4 2 - 1 - 6 1 3 41 Out - - - - - - - 1 - 3 - 2 4 1 2 1 3 3 3 10 41 LI 1604 - LCS In-Service Modernization Navy - - - 1 - UNCLASSIFIED Page 15 of 28 - P-1 Line #33 1 4 2 - Volume 1 - 611 === page 690 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / LCS Maintenance Modernization MDAP/MAIS Code: Installation 4 of 9: GRP: Targeted Performance Enhancements Manufacturer Information Manufacturer Name: VARIOUS Manufacturer Location: VARIOUS Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Nov 2024 Nov 2025 Nov 2026 Nov 2027 Nov 2028 Nov 2029 FY 2031 Delivery Dates Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Installation Information Method of Implementation: Method:: Installation Name: Targeted Performance Enhancements Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - - / - 9 / 1.803 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 9 / 1.803 FY 2026 - / - - / - 7 / 1.903 3 / 1.235 - / - - / - - / - 0 / 0.000 67 / 14.156 FY 2027 - / - - / - - / - - / - - / - - / - 34 / 6.993 7 / 1.739 - / - - / - 0 / 0.000 41 / 8.732 FY 2028 - / - - / - - / - - / - - / - - / - 2 / 0.209 32 / 5.089 3 / 0.376 - / - 0 / 0.000 37 / 5.674 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 16 / 2.911 - / - 0 / 0.000 16 / 2.911 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - 24 / 4.754 0 / 0.000 24 / 4.754 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.254 2 / 0.254 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - - / - Installation Cost 16 / 3.706 57 / 11.018 0 / 0.000 57 / 11.018 57 / 11.018 0 / 0.000 57 / 11.018 39 / 8.437 39 / 6.828 19 / 3.287 24 / 4.754 / - - / - - 2 / 0.254 / - / - 196 / 38.284 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - 1 3 6 6 36 5 - 16 - 15 - 24 13 4 20 2 - 12 7 - - - 24 - 2 196 Out - - - - - 1 1 12 23 14 - 16 15 13 11 9 22 - 14 26 196 - LI 1604 - LCS In-Service Modernization Navy 1 - - 5 UNCLASSIFIED Page 16 of 28 - 4 P-1 Line #33 5 - 4 Volume 1 - 612 === page 691 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / LCS Maintenance Modernization MDAP/MAIS Code: Installation 5 of 9: GRP: Obsolescense Manufacturer Information Manufacturer Name: VARIOUS Manufacturer Location: VARIOUS Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Nov 2024 Nov 2025 Nov 2026 Nov 2027 Nov 2028 Nov 2029 FY 2031 Delivery Dates Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Installation Information Method of Implementation: Method:: Installation Name: Obsolescense Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - - / - - / - - / - - / - - / - - FY 2025 - / - - / - 8 / 2.422 2 / 1.152 0 / 0.000 2 / 1.152 - / - - / - - / - - / - 0 / 0.000 10 / 3.574 FY 2026 - / - - / - - / - 5 / 0.783 0 / 0.000 5 / 0.783 3 / 1.759 - / - - / - - / - 0 / 0.000 8 / 2.542 FY 2027 - / - - / - - / - 4 / 0.223 0 / 0.000 4 / 0.223 - / - 4 / 2.387 1 / 0.608 - / - 0 / 0.000 9 / 3.218 FY 2028 - / - - / - - / - - / - - / - - / - - / - 5 / 1.906 1 / 0.608 - / - 0 / 0.000 6 / 2.514 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 5 / 1.941 2 / 1.237 0 / 0.000 7 / 3.178 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 3 / 0.725 5 / 1.976 1 / 0.630 9 / 3.331 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 1.271 2 / 1.271 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - - / - 8 / 2.422 Installation Cost / - - / - - 11 / 2.158 / - 0 / 0.000 11 / 2.158 3 / 1.759 9 / 4.293 10 / 3.882 7 / 3.213 / - - / - - 3 / 1.901 / - / - 51 / 19.628 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - 4 4 - 5 1 1 4 1 1 - 1 1 1 5 2 1 7 2 - 1 2 3 1 3 51 Out - - - - - - 2 8 4 2 1 1 2 2 8 2 4 9 51 LI 1604 - LCS In-Service Modernization Navy - - - - - - 4 1 UNCLASSIFIED Page 17 of 28 - - P-1 Line #33 1 - Volume 1 - 613 === page 692 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / LCS Maintenance Modernization MDAP/MAIS Code: Installation 6 of 9: GRP: AECS/MPCMS Manufacturer Information Manufacturer Name: VARIOUS Manufacturer Location: VARIOUS Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Nov 2024 Nov 2025 Nov 2026 Nov 2027 Nov 2028 Nov 2029 FY 2031 Delivery Dates Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Installation Information Method of Implementation: Method:: Installation Name: AECS/MPCMS Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - - / - 4 / 3.123 - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 4 / 3.123 FY 2026 - / - - / - 3 / 1.143 - / - - / - - / - - / - 0 / 0.000 14 / 5.671 FY 2027 - / - - / - - / - - / - - / - - / - 6 / 0.568 6 / 6.440 - / - - / - 0 / 0.000 12 / 7.008 FY 2028 - / - - / - - / - - / - - / - - / - - / - 6 / 1.984 8 / 7.468 - / - 0 / 0.000 14 / 9.452 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 8 / 5.678 - / - 0 / 0.000 8 / 5.678 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.912 8 / 6.354 0 / 0.000 10 / 7.266 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 5 / 4.266 21 / 22.438 26 / 26.704 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - - / - 7 / 4.266 Installation Cost 11 / 4.528 0 / 0.000 11 / 4.528 11 / 4.528 0 / 0.000 11 / 4.528 6 / 0.568 12 / 8.424 18 / 14.058 / - - 13 / 10.620 / - - / - - 21 / 22.438 / - / - 88 / 64.902 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - 5 - 2 9 2 - - - 4 - 2 5 - 7 - 1 10 7 - 1 6 6 - 21 88 Out - - - - - - 7 - 4 - 2 - 2 10 - 6 2 38 88 LI 1604 - LCS In-Service Modernization Navy - - - 1 - 2 6 2 - UNCLASSIFIED Page 18 of 28 - P-1 Line #33 - 6 Volume 1 - 614 === page 693 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / LCS Maintenance Modernization MDAP/MAIS Code: Installation 7 of 9: GRP: Communications Manufacturer Information Manufacturer Name: VARIOUS Manufacturer Location: VARIOUS Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Nov 2024 Nov 2025 Nov 2026 Nov 2027 Nov 2028 Nov 2029 FY 2031 Delivery Dates Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Installation Information Method of Implementation: Method:: Installation Name: Communications Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - Prior Years - / - - / - - / - - / - - / - - / - - FY 2025 - / - 6 / 5.648 / - 42 / 12.240 - / - 1 / 0.101 - 0 / 0.000 1 / 0.101 - / - - / - - / - - / - 0 / 0.000 49 / 17.989 FY 2026 - / - - / - 12 / 5.778 88 / 27.941 0 / 0.000 88 / 27.941 1 / 2.703 - / - - / - - / - 0 / 0.000 101 / 36.422 FY 2027 - / - - / - - / - 9 / 1.874 0 / 0.000 9 / 1.874 39 / 6.162 2 / 3.532 1 / 0.776 - / - 0 / 0.000 51 / 12.344 FY 2028 - / - - / - - / - - / - - / - - / - 8 / 0.664 36 / 12.746 2 / 3.020 - / - 0 / 0.000 46 / 16.430 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 25 / 10.741 3 / 2.369 0 / 0.000 28 / 13.110 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 3 / 3.416 25 / 13.431 0 / 0.000 28 / 16.847 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 6 / 2.469 6 / 2.469 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - 6 / 5.648 54 / 18.018 / - - 98 / 29.916 / - 0 / 0.000 98 / 29.916 48 / 9.529 38 / 16.278 31 / 17.953 28 / 15.800 / - - / - / - - 6 / 2.469 309 / 115.611 / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - 2 3 - 1 3 12 12 27 46 8 8 36 2 16 - 30 4 3 30 1 1 17 13 - 3 8 16 1 6 309 Out - 2 2 2 4 3 5 21 42 8 30 12 27 18 8 22 3 15 9 22 10 - 9 34 309 - - - - LI 1604 - LCS In-Service Modernization Navy UNCLASSIFIED Page 19 of 28 - P-1 Line #33 1 Volume 1 - 615 === page 694 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / LCS Maintenance Modernization MDAP/MAIS Code: Installation 8 of 9: GRP: HM&E Manufacturer Information Manufacturer Name: VARIOUS Manufacturer Location: VARIOUS Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Nov 2024 Nov 2025 Nov 2026 Nov 2027 Nov 2028 Nov 2029 FY 2031 Delivery Dates Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Installation Information Method of Implementation: Method:: Installation Name: HM&E Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - - / - 19 / 6.538 1 / 0.275 0 / 0.000 1 / 0.275 - / - - / - - / - - / - 0 / 0.000 20 / 6.813 FY 2026 - / - - / - 12 / 1.741 69 / 22.986 0 / 0.000 69 / 22.986 - / - - / - - / - 0 / 0.000 84 / 25.211 FY 2027 - / - - / - - / - - / - - / - - / - 49 / 12.460 14 / 5.731 - / - - / - 0 / 0.000 63 / 18.191 FY 2028 - / - - / - - / - - / - - / - - / - 5 / 1.694 28 / 11.470 6 / 1.085 - / - 0 / 0.000 39 / 14.249 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 22 / 8.274 - / - 0 / 0.000 22 / 8.274 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.423 3 / 0.400 0 / 0.000 4 / 0.823 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.136 1 / 0.136 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - - / - Installation Cost - / - - 31 / 8.279 / - - 70 / 23.261 / - 0 / 0.000 3 / 0.484 70 / 23.261 57 / 14.638 42 / 17.201 29 / 9.782 3 / 0.400 / - - / - - 1 / 0.136 / - / - 233 / 73.697 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - 10 13 8 38 11 1 20 - 29 - 28 5 4 27 6 3 10 14 2 1 1 1 - 1 233 Out - - - - - - - - 4 3 20 32 11 10 20 29 4 24 4 19 9 5 16 13 2 4 233 LI 1604 - LCS In-Service Modernization Navy - 1 UNCLASSIFIED Page 20 of 28 - P-1 Line #33 3 Volume 1 - 616 === page 695 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 1 / LCS Maintenance Modernization MDAP/MAIS Code: Installation 9 of 9: GRP: Navigation Manufacturer Information Manufacturer Name: VARIOUS Manufacturer Location: VARIOUS Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Nov 2024 Nov 2025 Nov 2026 Nov 2027 Nov 2028 Nov 2029 FY 2031 Delivery Dates Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Installation Information Method of Implementation: Method:: Installation Name: Navigation Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - - / - - / - - FY 2025 - / - - / - 3 / 0.729 - / - - / - - / - - / - 2 / 5.392 1 / 2.744 - / - 0 / 0.000 6 / 8.865 FY 2026 - / - - / - 9 / 0.119 1 / 0.228 - / - - / - - / - 0 / 0.000 30 / 4.819 FY 2027 - / - - / - - / - - / - - / - - / - 5 / 0.883 3 / 0.660 - / - - / - 0 / 0.000 8 / 1.543 FY 2028 - / - - / - - / - - / - - / - - / - - / - 5 / 1.001 - / - - / - 3 / 8.624 8 / 9.625 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 6 / 1.255 - / - 0 / 0.000 6 / 1.255 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 6 / 1.307 6 / 1.331 0 / 0.000 12 / 2.638 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - Installation Cost 20 / 4.472 12 / 0.848 0 / 0.000 20 / 4.472 20 / 4.472 0 / 0.000 20 / 4.472 6 / 1.111 / - 10 / 7.053 13 / 5.306 6 / 1.331 / - - 3 / 8.624 / - 70 / 28.745 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - 3 4 5 8 4 2 6 - 4 - 2 3 - 7 - 1 6 6 - - 4 2 - 3 70 Out - - - - - - 7 7 4 - 8 4 - 2 - 3 4 12 70 - - 2 - - 4 - 1 6 2 - 4 Footnotes: (2) (3) (4) General Note: Modernization efforts in each category have variable costs based on specific procurement/install costs of the SCD being installed. Target Performance Enhancement costs vary across the FYDP due to number of procurement and installs each year and significant amount of variation between individual install schedules per ship. General Note: Installation schedule ins are full kit procurement contract award dates and outs are the scheduled ends of avail dates for installation of procured items. LI 1604 - LCS In-Service Modernization Navy UNCLASSIFIED Page 21 of 28 P-1 Line #33 Volume 1 - 617 === page 696 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization ID Code (A=Service Ready, B=Not Service Ready) : (5) (6) (7) (8) Modification Number / Title: 1 / LCS Maintenance Modernization MDAP/MAIS Code: The increase from FY26 to FY27 procurement costs for the AECS/AMCS category is due to NRE costs for the development of the Freedom Class AMCS Government Furnished Equipment (GFE) solution. Of the alterations funded in the communications line, the largest cost driver is the TSCE (Total Ship Computing Environment) system installs. In FY27, 7 LCS ships are getting TSCE HW/SW installs. In FY27, 8 LCS ships are getting full HM&E packages. These packages include multiple major systems required for operational availability. In FY27, the installation cost per-unit increase is due to VDR (Voyage Data Recorder) across Independence and Freedom Hulls. LI 1604 - LCS In-Service Modernization Navy UNCLASSIFIED Page 22 of 28 P-1 Line #33 Volume 1 - 618 === page 697 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 176.834 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 176.834 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 2 / Combat System Lethality & Survivability Upgrades 176.834 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 75.658 28.759 - - 75.658 28.759 - - 75.658 28.759 155.509 - 0.000 - 155.509 - 0.000 - 155.509 0.000 155.509 155.509 155.509 179.746 179.746 179.746 157.910 157.910 157.910 160.949 160.949 160.949 To FY 2031 Complete 162.907 Continuing 162.907 162.907 Total - Continuing Continuing Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: MT004 LCS Lethality and Survivability Lethality and Survivability (L&S) funding will provide for hardware procurement and installation of a common Combat Management System (CMS) comprised of Government Furnished Equipment (GFE), associated technical support data to upgrade the existing contractor furnished equipment, and associated cybersecurity modifications that will be back-fit onboard inservice LCS platforms. Funding will also provide for the non-recurring engineering for development of technical data packages and development of hardware and software packages necessary to integrate and test the common software baseline for two different LCS Class variants - Freedom and Independence. Production and planning support services for these upgrades are phased over a three (3) year span starting two (2) years prior to installation on a per hull basis, with installation to be accomplished during planned CNO Availabilities. L&S upgrades the following systems to GFE resulting in one combat system baseline with: Combat Management System: Gun (MK-20 Electro-Optical Surveillance System and Mk-160 Gun Fire Control System), Electronic Warfare Suite (Surface Electronic Warfare Improvement Program and MK-53 Nulka Decoy Launching System), Data Links (C2P), Mode 5 IFF (IFF AN/UPX-46), and Navigation Suite (NCDS, WSN-7/12, WSN-9, GPNTS, and ADAP). Installation costs across the FYDP vary depending on current port rates and install costs will be updated once an execution port is assigned. Port rates are updated every year by CNRMC based on the forecasted port loading model. Port loading rate forecasts are the rates recommended for all budgeted maintenance and organic modernization within a specific port. Individual ship's availability durations vary dependent upon the integration of ship's maintenance and modernization work packages. Due to the differences between the Independence and Freedom variant, installation costs will also vary between variants. Installation funding for a ship is divided over a three-year period: Installation execution funding in the year of availability, Design Service Allocation (DSA) two years prior to availability, and DSA in the year of the availability. This includes ship checks, ship installation drawing (SID) development, logistic document development and long lead time material procurements (LLTM). FY26 to FY27 changes: Updated the end items to reflect current nomenclature and full list of systems being installed as part of L&S. Notable additions include Navigation Suite (NCDS, WSN-7/12, WSN-9, GPNTS, and ADAP). LI 1604 - LCS In-Service Modernization Navy UNCLASSIFIED Page 23 of 28 P-1 Line #33 Volume 1 - 619 === page 698 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan (*) Indicates the modification is being installed organically and no installation funds are required. Modification Number / Title: 2 / Combat System Lethality & Survivability Upgrades FY 2025 FY 2026 Related RDT&E PEs: 0603581N FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement 1.1.1) TSCE - Freedom Variant - NonOrganic Installation 1 of 2 1.1.2) MK 20 EOSS - Organic 1 / 1.344 - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing - / 2.015 - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing - / 5.158 - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing (*) - / 1.469 - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing (*) - / 2.225 - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing 1 / 1.004 - / - 1 / 3.905 - / - 1 / 3.905 1 / 4.227 - (*) 1.1.3) SEWIP Blk II Lite - Organic (*) 1.1.4) MK 53 NULKA - Organic 1.1.5) MK 160 GFCS - Organic 2.1.1) Combat Management System (CMS) - Independence Variant - NonOrganic Installation 2 of 2 3 / 7.849 (9) (*) 2.1.2) MK 20 EOSS & MK 160 GFCS - Organic 2.1.3) SEWIP Blk II Lite - Organic (*) - / 19.920 - / 1.046 - / - - / 26.989 - / 3.789 - / - / 6.120 - / 0.379 - / - / - - / - / 0.141 - / - - (*) 2.1.4) MK 53 NULKA - Organic - (*) 2.1.5) CDLMS - Organic 2.1.6) SPS-77 - Organic / 15.915 - (*) 2.1.7) UPX 29A - Organic - (*) (*) 2.1.8) C2P - Organic 2.1.9) IFF - Organic (*) (*) 2.1.10) NCDS - Organic - / - - / 7.835 - - / 4.070 - / - / 14.740 - / - / 1.474 - / - / - - / - / 0.550 - / - - - 1 / 3.983 / 4.070 - / 14.740 - - / 1.474 - - / 4.151 - / 15.035 - / - / - - / 1.503 - / 0.550 1 / 4.063 - / 4.234 - / 15.336 - / - / - - / 1.533 - / 0.561 1 / 4.144 - / - - - / - - / 1.564 - / 0.572 - / 4.319 / 15.643 - / - - / - - / 0.583 - / 4.405 / 15.956 - / - / - / 0.000 - Continuing Continuing Continuing Continuing / 0.595 - / - / - - / - / - - / - / - - / - - / 0.594 - / - - / 2.310 - / - - / 2.310 - / 2.356 - / 2.403 - / 2.451 - / 2.500 - / - - / 12.614 - / - - / 0.537 - / - - / 2.090 - / - - / 2.090 - / 2.132 - / 2.175 - / 2.219 - / 2.263 - / - - / 11.416 - / - - / 0.481 - / - - / 1.870 - / - - / 1.870 - / 1.907 - / 1.945 - / 1.984 - / 2.024 - / - - / 10.211 - - / 1.583 - / - - / 6.160 - / - - / 6.160 - / 6.283 - / 6.409 - / 6.537 - / 6.668 - / - / - - / 0.088 - / - - / 0.341 - / - - / 0.341 - / 0.348 - / 0.355 - / 0.362 - / 0.369 - / - (*) 2.1.13) GPNTS - Organic - / - - / 0.492 - / - - / 1.914 - / - - / 1.914 - / 1.952 - / 1.991 - / 2.031 - / 2.072 - / - (*) - / - - / 0.200 - / - - / 0.781 - / - - / 0.781 - / 0.797 - / 0.813 - / 0.829 - / 0.846 - / - / 10.334 - / - / 40.205 - / - - - / - - - / - / 96.839 - - - - / 40.205 - / 41.008 - / 41.829 - / 42.666 - / 43.520 - / 3.002 / - / - Subtotal: Procurement - - - 2.1.14) ADAP - Organic / 42.145 / 107.488 / - - 2.1.12) WSN-9 - Organic - / 1.595 (*) 2.1.11) WSN-7/12 - Organic (*) 8 / 29.175 / 7.835 / 33.640 - - / 1.863 / 10.452 - / 4.266 Continuing Continuing / - - - Installation Installation 1 of 2: GRP: Combat System Lethality & Survivability Upgrades - Freedom - / 8.472 / - / - Installation 2 of 2: GRP: Combat System Lethality & Survivability Upgrades - Independence - / 71.523 - / 65.324 - / 28.759 - / 115.304 Subtotal: Installation - / 79.995 - / 65.324 - / 28.759 - / 115.304 LI 1604 - LCS In-Service Modernization Navy - - / - - / - - / - - / - - / 0.000 / 8.472 / 0.000 - / 115.304 - / 138.738 - / 116.081 - / 118.283 - / 119.387 Continuing Continuing / - - / 115.304 - / 138.738 - / 116.081 - / 118.283 - / 119.387 Continuing Continuing - UNCLASSIFIED Page 24 of 28 P-1 Line #33 Volume 1 - 620 === page 699 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: [No Model Specified] Modification Type: TBD Prior Years FY 2027 Base Financial Plan (*) Indicates the modification is being installed organically and no installation funds are required. Modification Number / Title: 2 / Combat System Lethality & Survivability Upgrades FY 2025 FY 2026 Related RDT&E PEs: 0603581N FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Total Cost (Procurement + Support + Installation) LI 1604 - LCS In-Service Modernization Navy 176.834 75.658 28.759 155.509 0.000 UNCLASSIFIED Page 25 of 28 155.509 179.746 157.910 P-1 Line #33 160.949 162.907 Continuing Continuing Volume 1 - 621 === page 700 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / Combat System Lethality & Survivability Upgrades MDAP/MAIS Code: Installation 1 of 2: GRP: Combat System Lethality & Survivability Upgrades - Freedom Manufacturer Information Manufacturer Name: VARIOUS Manufacturer Location: VARIOUS Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 18 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: CS L&S Upgrades:: Installation Name: Combat System Lethality & Survivability Upgrades - Freedom Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 1 / 8.472 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 8.472 FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 - / - Total 1 / 8.472 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.000 1 / 8.472 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 Out 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 LI 1604 - LCS In-Service Modernization Navy UNCLASSIFIED Page 26 of 28 P-1 Line #33 Volume 1 - 622 === page 701 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / Combat System Lethality & Survivability Upgrades MDAP/MAIS Code: Installation 2 of 2: GRP: Combat System Lethality & Survivability Upgrades - Independence Manufacturer Information Manufacturer Name: VARIOUS Manufacturer Location: VARIOUS Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 18 Dates FY 2025 Contract Dates Delivery Dates FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 May 2025 May 2027 May 2028 May 2029 May 2030 May 2031 Nov 2026 Nov 2028 Nov 2029 Nov 2030 Nov 2031 Nov 2032 Installation Information Method of Implementation: CS L&S Upgrades:: Installation Name: Combat System Lethality & Survivability Upgrades - Independence Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 1 / 71.523 - / - - / - - / - - / - 0 / 0.000 3 / 169.367 0 / 28.704 - / - - / - - / - 1 / 0.000 2 / 134.576 - / - - / - - / - - - / - 0 / 0.000 Prior Years 1 / 62.058 1 / 24.445 0 / 11.341 0 / 0.000 0 / 11.341 FY 2025 - / - 0 / 3.266 0 / 4.314 1 / 98.292 0 / 0.000 1 / 98.292 FY 2026 - / - - / - - / - - FY 2027 - / - - / - - / - 0 / 5.671 0 / 0.000 0 / 5.671 0 / 95.681 1 / 92.865 0 / 8.762 FY 2028 - / - - / - - / - - / - - / - - / - 0 / 14.353 0 / 17.859 1 / 90.538 0 / 8.843 FY 2029 - / - - / - - / - - / - - / - - / - - / - 0 / 5.357 0 / 14.603 1 / 91.383 Continuing Continuing FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 0 / 4.380 0 / 14.739 Continuing Continuing FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 4.422 1 / 0.000 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - 0 / 0.000 Total 1 / 71.523 1 / 65.324 1 / 28.759 / - - 1 / 115.304 / - - 0 / 0.000 / - - 1 / 115.304 / - 0 / 138.738 1 / 116.081 1 / 118.283 0 / 0.000 / - 1 / 119.387 / - Continuing - / - 1 / 202.979 1 / 131.593 1 / 4.422 - / - Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 1 - 1 - - - 1 - - - 1 - - - - - - - - 1 - - - - 1 - - 1 - 3 10 Out 1 - - - - - - - - - - - - - - - - - - - 6 10 - - - 1 1 - 1 - - Footnotes: (9) Installation costs across the FYDP vary depending on current port rates and install costs will be updated once an execution port is assigned. Port rates are updated every year by CNRMC based on the forecasted port loading model. Port loading rate forecasts are the rates recommended for all budgeted maintenance and organic modernization within a specific port. Individual ship's availability durations vary dependent upon the integration of ship's maintenance and modernization work packages. Due to the differences between the Independence and Freedom Classes, installation costs will also vary between LI 1604 - LCS In-Service Modernization Navy UNCLASSIFIED Page 27 of 28 P-1 Line #33 Volume 1 - 623 === page 702 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 P-1 Line Item Number / Title: 1604 / LCS In-Service Modernization ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: 2 / Combat System Lethality & Survivability Upgrades MDAP/MAIS Code: variants. Installation funding for a ship is divided over a three-year period: Installation execution funding in the year of availability, and Design Service Allocation (DSA) two years prior to availability, and DSA in the year prior to the availability. This includes ship checks, ship installation drawing (SID) development, logistic document development and long lead time material procurements (LLTM). Note: In FY27, increase in unit cost is due to several factors such as previous multiyear block contracts ending and new contracts are being awarded at higher rates due to inflation, tariffs and re-negotiated vendor rate agreements. Installation cost increased due to out of area/homeport contract awards, program of record system budget lines covering smaller portion of cost than anticipated, and planning yard labor and material increases. Note 1: The FY25 procurement planned for installation in FY26 was removed to fund higher priority Navy projects. This asset will install during a future availability outside the FY27-FY31 FYDP. LI 1604 - LCS In-Service Modernization Navy UNCLASSIFIED Page 28 of 28 P-1 Line #33 Volume 1 - 624 === page 703 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 15: Other Ship Support ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1611 / Small & Medium UUV Program Elements for Code B Items: 0604218N, 0604028N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 217.244 217.244 217.244 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 48.780 7.000 85.025 92.319 94.929 - - 48.780 7.000 - - 48.780 7.000 110.955 - 0.000 - 110.955 - 0.000 - 110.955 0.000 110.955 110.955 110.955 - - - 85.025 92.319 94.929 To FY 2031 Complete - Total - 96.671 Continuing - Continuing - 96.671 Continuing - Continuing - - - - - 85.025 92.319 94.929 96.671 Continuing Continuing 9.153 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 8.681 - 6.434 - 6.434 9.349 5.793 9.863 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Lionfish and Viperfish are the next generation UUVs that will replace the MK18 Mod 1 and Mod 2 UUVs currently in the fleet. They are the Navy's first cybersecure UUVs, which support mine countermeasures (MCM), Intelligence Preparation of the Operational Environment (IPOE), Subsea and Seabed Warfare (SSW), Naval Special Warfare (NSW) Maritime Homeland Defense (MHLD) and combat salvage. Both provide a critical Detect-to-Engage capability to Expeditionary Mine counter measures (ExMCM) forces, organized into 18 ExMCM companies across the Navy. These UUVs can be used in very shallow to deep waters to clear sea mines and enable fleet movement and maneuver through chokepoints and key water space, enable logistics at sea and between sea and shore in a contested environment, and to enable movement of Marines from ship to shore to seize and hold key terrain in support of Expeditionary Advanced Base Operations. P5 / 5N300 Lionfish is a Small Unmanned Undersea Vehicle (SUUV) that replaces the legacy MK 18 Mod 1, utilizes advanced sensors and autonomy, and can be launched and recovered from small boats and craft, surface ships, vessels of opportunity, submarines, piers and shorelines, and various platforms. Viperfish, the deep water variant of Lionfish, replaces legacy MK 18 Mod 2 UUVs, and leverages recent innovation and technical advances to enable it to be delivered in a Small UUV form factor using Lionfish as a baseline as an ECP with enhanced depth performance and mission capability. P5 / 5N001 KNIFEFISH (SMCM UUV w/LFBB)]: The Knifefish Surface Mine Countermeasure Unmanned Undersea Vehicle (SMCM UUV) program procures Unmanned Undersea Vehicles to support clandestine mine detection capability against volume and bottom mines including buried mine detection. The Knifefish system is composed of two UUVs, batteries, launch and handling system, and other support equipment. P5 / 5N100 TETRA: TETRA is a Remotely Operated Vehicle (ROV) with the capacity for multiple mission payloads as a key enabler to Subsea and Seabed Warfare (SSW) as identified in the SSW Initial Capabilities Document (ICD). A single TETRA system is comprised of 2 ROVs equipped with mission-dependent payload(s) and Ancillary Equipment The FY 2026 spend plan for Small and Medium Unmanned Undersea Vehicles (UUVs) program includes $7,000 thousand of discretionary funding and $345,086 thousand of mandatory funding for a total of $352,086 thousand. The mandatory funds unmanned underwater vehicle production. [P5 / 5N001 KNIFEFISH (SMCM UUV w/LFBB)]: The Knifefish Surface Mine Countermeasure Unmanned Undersea Vehicle (SMCM UUV) program procures Unmanned Undersea Vehicles to support clandestine mine detection capability against volume and bottom mines including buried mine detection. The Knifefish system is composed of two UUVs, batteries, launch and handling system, and other support equipment. LI 1611 - Small & Medium UUV Navy UNCLASSIFIED Page 1 of 16 P-1 Line #34 Volume 1 - 625 === page 704 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 15: Other Ship Support ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1611 / Small & Medium UUV Program Elements for Code B Items: 0604218N, 0604028N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P5 / 5N210 Razorback MK19]: A part of the Family of UUVs, Razorback is a medium class UUV capable of persistent, autonomous, ocean sensing and data collection in support of Navy Subsea and Seabed Warfare (SSW) including Intelligence Preparation of the Operational Environment (IPOE) missions. The Razorback MK19 program procures systems with submarine integration via torpedo tube launch and recovery (TTL&R), Shock and Fire Enclosure Capsule (SAFECAP), high-density batteries, IPOE payloads, and support equipment. [P5 / 5N210 Razorback w/ Classified Payload]: The Razorback w/ Classified Payload program procures systems with submarine integration via TTL&R), SAFECAPs, and classified payloads, to support classified missions. Justification: LI 1611 - Small & Medium UUV Navy UNCLASSIFIED Page 2 of 16 P-1 Line #34 Volume 1 - 626 === page 705 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 15: Other Ship Support ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1611 / Small & Medium UUV Program Elements for Code B Items: 0604218N, 0604028N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Small & Medium UUV P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 217.244 - / 48.780 - / 7.000 - / 110.955 - / 0.000 - / 110.955 - / 217.244 - / 48.780 - / 7.000 - / 110.955 - / 0.000 - / 110.955 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding is required for the next generation of Small Class Unmanned Undersea Vehicles (Lionfish) along with procurement of Mission Support Equipment for the Lionfish systems. CE 3.1.1 LIONFISH (SUUV): Procurement of additional 5 UUVs in FY 2027. These additional UUVs ensure ExMCM companies will be outfitted with UUVs in order to conduct their primary mission of expeditionary mine countermeasures. CE 3.1.2 LIONFISH ASP (FLS): Procurement of additional 2 sensor packages in FY 2027. Current procurement profile provides increased capability to INDOPACOM consistent with requirements and required delivery schedules. CE 3.1.3 Viperfish (UUV): Procurement of initial production units of 2 deep water expeditionary UUVs in FY27. These initial production units will be used to assess production readiness and begin to outfit the recently manned ExMCM companies 13-18 that currently do not have deep water UUV capability. CE 3.1.4 LIONFISH MSE: Procurement quantities of 2 units in FY 2027 for a favorable UUV step ladder pricing. CE 3.1.5 Viperfish MSE: Procurement of initial set of mission support equipment for deep water expeditionary UUVs with baseline appropriations begins in FY28 to support when UUVs are delivered to operational forces. These MSE units will leverage configuration commonality with Lionfish MSE units, and will provide storage, maintenance, charging, transportation and other operational support to the initial Viperfish UUVs to be produced in the same year. Deep Water MSE is required to outfit the recently manned ExMCM companies 13-18 that currently do not have deep water UUV capability. CE 3.1.6 and 3.1.7 Expeditionary UUV Production Engineering and Initial Training: All production engineering and operational force training for these newly fielded systems. CE 6.1.1 - MEDUSA: FY 2027 zero's funding for MEDUSA production. CE 5.1.1 TETRA: The FY 2025 budget for Small and Medium Unmanned Undersea Vehicles (UUVs) program included $2,592K and quantity of 1 Tetra Remotely Operated Vehicle (ROV) 2 Tetra Payload Packages of discretionary funding and $157,607K and quantity of 26 Remotely Operated Vehicles (ROVs), 15 Ancillary Equipment kits (Launch and Recovery Canisters), and payload packages for the TETRA system of mandatory funding for a total of $160,199K and a quantity of 27 ROVs, 2 Tetra Payload Packages, 15 Ancillary Equipment Kits and multiple payload packages. The mandatory funds support Tetra and Bootstrap system procurement. CE 7.1.1 -7.1.9 Now 6.1.1 Razorback MK19: FY27 funding will support procurement of the first two MK19 Next Generation variant of vehicles and SAFECAPs. Funding is also required to procure Passive Propigation Resistant (PPR) battery upgrade kits and IPOE payloads for the MK19 vehicles. The FY 2026 request for MK19 program includes $0 and quantity of 0 of discretionary funding and $6,000 and quantity of 0 of FY25 mandatory funding for a total of $6,000 and a quantity of 0. The mandatory funds supported MK19 engineering services and fielding efforts. LI 1611 - Small & Medium UUV Navy UNCLASSIFIED Page 3 of 16 P-1 Line #34 Volume 1 - 627 === page 706 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 15: Other Ship Support ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1611 / Small & Medium UUV Program Elements for Code B Items: 0604218N, 0604028N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A The FY 2027 request for MK19 program includes $13,552 and quantity of 2 vehicles, sub support equipment, SAFECAPs Payloads and Battery kits discretionary funding and $0 and quantity of mandatory funding. Further information for this reconciliation request will be provided in the Reconciliation Exhibit. FY2026 budget of MK 18 MOD 3 Lionfish program a quantity of 52 Lionfish (SUUV), 6 Lionfish Forward Looking Sonar (FLS), and 17 Lionfish Mission Support Equipment (MSE) sets. The FY2026 funds support additional procurements of Lionfish and associated equipment to accelerate attainment of Mine Countermeasures (MCM) UUVs to equip 6 newly established ExMCM companies that require UUVs. The FY2027 request for the MK 18 MOD 3 Lionfish program includes $13,922k of discretionary funding for a quantity of 5 Lionfish (SUUV), 2 Lionfish Forward Looking Sonar (FLS), and 2 Lionfish Mission Support Equipment (MSE) sets, and $0k of mandatory funding. Continued discretionary procurement funding in FY 2027 and beyond will advance the number of fielded units towards the fleet's inventory objective plus associated sensors and support equipment, to enable existing ExMCM companies to replace legacy MK 18 MOD 1 UUVs that are reaching or are beyond end of life. Further information for this reconciliation request will be provided in the Reconciliation Exhibit. FY2026 budget of MK 18 MOD 4 Viperfish program funds a quantity of 7 Viperfish (Deep Water UUV) and 4 Viperfish Mission Support Equipment (MSE) sets. The FY2026 funds support initial procurements of Viperfish and associated equipment to accelerate attainment of Deep Water UUVs to equip 6 newly established ExMCM companies that require deep water UUVs. The FY2027 request for the MK 18 MOD 4 Viperfish program funds a quantity of 2 Viperfish (SUUV) and 0 Viperfish Mission Support Equipment (MSE) sets. Continued procurement funding in FY 2027 and beyond will advance the number of fielded units to continue to equip the 6 newly established ExMCM companies, and then continue towards the full fleet inventory objective to replace existing legacy Deep Water MK 18 MOD 2 UUVs that are reaching or are beyond end of life. LI 1611 - Small & Medium UUV Navy UNCLASSIFIED Page 4 of 16 P-1 Line #34 Volume 1 - 628 === page 707 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1611 / Small & Medium UUV Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Small & Medium UUV MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) 217.244 Less PY Advance Procurement ($ in Millions) - - 48.780 7.000 - Net Procurement (P-1) ($ in Millions) 217.244 Plus CY Advance Procurement ($ in Millions) - - 48.780 7.000 - Total Obligation Authority ($ in Millions) 217.244 - - 48.780 7.000 FY 2027 Base FY 2027 OOC - - 110.955 FY 2027 Total - 0.000 - 110.955 - 110.955 - 0.000 - 110.955 - - 110.955 0.000 110.955 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 8.681 - 3.868 - 3.868 Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - 5N001 KNIFEFISH (SMCM UUV w/LFBB) Cost Recurring Cost 1.1.1) Knifefish Retrofit Kits - - 13.250 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 13.250 - - - - - - - - - - - - - - - 1.2.1) Production Engineering - - 1.750 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 1.750 - - - - - - - - - - - - - - - Subtotal: Hardware - 5N001 KNIFEFISH (SMCM UUV w/ LFBB) Cost - - 15.000 - - - - - - - - - - - - - - - Non Recurring Cost Hardware - 5N200 MK 18 UUV FAMILY OF SYSTEMS Cost Recurring Cost 2.1.1) MK 18 MOD 2 UUV 1,711K 9 15.402 - - - - - - - - - - - - - - - 2.1.2) MK 18 Auxiliary & Mission Support Equipment 381,545.45 11 4.197 - - - - - - - - - - - - - - - 2.1.3) MK 18 MOD 2 Advanced Sensor Kits (SSAM) 615,000.00 6 3.690 - - - - - - - - - - - - - - - 2.1.4) MK 18 MOD 2 Advanced Sensor Kits (ATLAS) 425,000.00 5 2.125 - - - - - - - - - - - - - - - LI 1611 - Small & Medium UUV Navy UNCLASSIFIED Page 5 of 16 P-1 Line #34 Volume 1 - 629 === page 708 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1611 / Small & Medium UUV Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Small & Medium UUV MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 2.1.5) MK 18 Advanced Sensor Package (FLS) 1,080K 10 10.800 - - - - - - - - - - - - - - - 2.1.6) MK 18 Advanced Sensor Package (SAS) 1,451K 10 14.506 - - - - - - - - - - - - - - - 2.1.7) MK 18 Advanced Sensor Package (VCM Kits) 150,000.00 18 2.700 - - - - - - - - - - - - - - - 2.1.8) MK 18 MOD 2 Retrofit Kits (Inc II) 1,258K 5 6.292 - - - - - - - - - - - - - - - 2.1.9) MK 18 Family of Systems Production Engineering - - 5.817 - - 1.312 - - - - - - - - - - - - 2.1.10) MK 18 MOD FoS OCO Reset - - 2.946 - - - - - - - - - - - - - - - 2.1.11) MK18 Advanced Sensors Package Commercialization Transition Maturation - - 4.836 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 73.311 - - 1.312 - - - - - - - - - - - - Subtotal: Hardware - 5N200 MK 18 UUV FAMILY OF SYSTEMS Cost - - 73.311 - - 1.312 - - - - - - - - - - - - Hardware - 5N300 MARITIME EXPEDITIONARY MCM UUV Cost Recurring Cost 3.1.1) LIONFISH (SUUV) (†) (1) 3.1.2) LIONFISH Advanced Sensor Package (FLS) (†) (2) 3.1.3) VIPERFISH (DEEPWATER UUV) (†) (3) 3.1.4) LIONFlSH 3.1.6) Expeditionary UUV Production (5) 3.1.7) Expeditionary UUV Initial Training 25 33.682 1,358K 12 16.298 - - - 1,340K 5 6.702 - - - 1,340K 5 6.702 - - - - - - - - - 1,059K 2 2.118 - - - 1,059K 2 2.118 - - - - - - - - - 2,275K 2 4.550 - - - 2,275K 2 4.550 5.988 1,631K 4.894 - - - 1,507K 2 3.014 - - - 1,507K 2 3.014 665,333.33 (†) (4) MSE Engineering 1,347K (6) 9 3 - - 5.217 - - 0.925 - - - - - 1.288 - - - - - 1.288 - - 1.589 - - 0.403 - - - - - 0.800 - - - - - 0.800 LI 1611 - Small & Medium UUV Navy UNCLASSIFIED Page 6 of 16 P-1 Line #34 Volume 1 - 630 === page 709 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1611 / Small & Medium UUV Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Small & Medium UUV MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) Subtotal: Recurring Cost Subtotal: Hardware - 5N300 MARITIME EXPEDITIONARY MCM UUV Cost FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 46.476 - - 22.520 - - - - - 18.472 - - - - - 18.472 - - 46.476 - - 22.520 - - - - - 18.472 - - - - - 18.472 - 0.081 - - - - - 0.977 - - - - - 0.977 4.458 - - - 1,546K 6.183 - - - 1,546K Hardware - 5N004 NAVAL SPECIAL WARFARE FORCES MK18 UUV Cost Recurring Cost 4.1.1) SUPPORT - - 0.698 - 1,358K 11 14.936 1,486K Subtotal: Recurring Cost - - 15.634 - - 4.539 - - - - - 7.160 - - - - - 7.160 Subtotal: Hardware 5N004 NAVAL SPECIAL WARFARE FORCES MK18 UUV Cost - - 15.634 - - 4.539 - - - - - 7.160 - - - - - 7.160 1.397 - - - 1,632K 2 3.264 - - - 1,632K 2 3.264 - - - - 4,463K 1 4.463 - - - 4,463K 1 4.463 1.195 - - - 250,000.00 2 0.500 - - - 250,000.00 2 0.500 EQUIPMENT (7) 4.1.2) NSW (†) (8) LIONFISH 3 4 4 6.183 Hardware - 5N100 TETRA Cost Recurring Cost 5.1.1) TETRA Remotely Operated Vehicle (ROV) (†) (9) 5.1.2) Ancillary Equipment Kit TETRA (†) (10) 5.1.3) Payload (†) Packages - TETRA (11) 5.1.4) Classifed 1,208K 6 7.249 1,397K 2,058K 3 6.175 - 446,166.67 6 2.677 1 - 597,500.00 2 (12) - - - - - - - - - - - 54.050 - - - - - 54.050 Subtotal: Recurring Cost - - 16.101 - - 2.592 - - - - - 62.277 - - - - - 62.277 Subtotal: Hardware - 5N100 TETRA Cost - - 16.101 - - 2.592 - - - - - 62.277 - - - - - 62.277 - 17.033 1,856K 9.280 - - - - - - - - - - - - Project Hardware - 5N210 Razorback MK19 Cost Recurring Cost 6.1.1) Razorback MK19 Upgrades/ (†) Backfits - LI 1611 - Small & Medium UUV Navy 5 UNCLASSIFIED Page 7 of 16 P-1 Line #34 Volume 1 - 631 === page 710 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1611 / Small & Medium UUV Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Small & Medium UUV MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 6.1.2) Razorback MK19 Production Engineering - - 13.020 - - 4.393 - - - - - 0.525 - - - - - 0.525 6.1.3) Razorback MK19 Installation - - 20.669 - - - - - - - - - - - - - - - 6.1.4) Razorback MK19 Fielding - - - - - 4.144 - - - - - - - - - - - - - - - - - - - - - 2,800K 2 5.600 - - - 2,800K 2 5.600 - - - - - - - - - 1,500K 2 3.000 - - - 1,500K 2 3.000 MK19 SAFECAP - - - - - - - - - 1,200K 2 2.400 - - - 1,200K 2 2.400 6.1.8) Razorback MK19 Payloads - - - - - - - - - 646,000.00 2 1.292 - - - 646,000.00 2 1.292 - - - - - - - - - 260,000.00 2 0.520 - - - 260,000.00 2 0.520 Subtotal: Recurring Cost - - 50.722 - - 17.817 - - - - - 13.337 - - - - - 13.337 Subtotal: Hardware - 5N210 Razorback MK19 Cost - - 50.722 - - 17.817 - - - - - 13.337 - - - - - 13.337 5.600 - - - 2,800K 6.1.5) Razorback MK19 Vehicle Procurement (†) (13) 6.1.6) Razorback MK19 Sub Support (†) (14) Equipment 6.1.7) Razorback (†) (15) 6.1.9) Razorback MK19 PPR Battery (†) (16) Kits Hardware - 5N210 Razorback w/ Classified Payload Cost Recurring Cost 7.1.1) Razorback Classified Payload (†) (17) Vehicle 7.1.2) Classified Payload (18) 7.1.3) Classified Payload Vehicle Production Engineering (†) - - - - - - - - - 2,800K 2 - - - - - - - - - - - 1.547 - - - - - 1.547 - - - - - - - - - - - 0.362 - - - - - 0.362 - - - - - - - - - 1,100K 2.200 - - - 1,100K - - - - - - - - - - - 9.709 - - - - - 9.709 Subtotal: Hardware - 5N210 Razorback w/ Classified Payload Cost - - - - - - - - - - - 9.709 - - - - - 9.709 LI 1611 - Small & Medium UUV Navy UNCLASSIFIED Page 8 of 16 P-1 Line #34 2 5.600 Subtotal: Recurring Cost 7.1.4) SAFECAP 2 2 2.200 Volume 1 - 632 === page 711 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1611 / Small & Medium UUV Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Small & Medium UUV MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - Congressional add Cost Non Recurring Cost 8.1.1) Congressional add - - - - - - - - 7.000 - - - - - - - - - Subtotal: Non Recurring Cost - - - - - - - - 7.000 - - - - - - - - - Subtotal: Hardware Congressional add Cost - - - - - - - - 7.000 - - - - - - - - - Gross/Weapon System Cost - - - - 48.780 - - 7.000 - - - - 0.000 - - 217.244 110.955 110.955 Remarks: [Hardware] Beginning in FY21 and continuing across the FYDP, funding previously included in OPN LI 0977 for procurement of Expeditionary Mine Countermeasures (ExMCM), Unmanned Undersea Vehicles (UUVs) is now included in the Small And Medium Class UUV OPN LI 1611. MK18 FOS enables expeditionary forces to conduct mine countermeasure operations from various platforms. [Hardware] P5/Razorback w/ Classified Payload: the funding for the procurement of a classified payload and a Razorback variant vehicle to carry the payload, augmenting the capability of the Razorback vehicles. (†) indicates the presence of a P-5a Footnotes: (1) CE 3.1.1. Lionfish (SUUV): Provides for procurement of Lionfish vehicles, including energy modules, propulsion and forward sections, and afloat equipment, including surface communication stations, hard drive docking stations, and containers. These SUUVs will be employed in support of Expeditionary Mine Countermeasures. Initial procurement supports the recently growth in ExMCM forces, including companies 13-18, and follow on replacement of the legacy MK 18 MOD 1 SUUV in ExMCM companies 1-12. Lionfish (SUUV) Cost Element included $0 of discretionary funding, and $68,453k of mandatory funding for a quantity of 52 Lionfish (SUUV). The FY2026 mandatory funds support additional procurements of Lionfish and associated equipment to accelerate attainment of Mine Countermeasures (MCM) UUVs to equip 6 newly established ExMCM companies that require UUVs. (2) CE 3.1.2 LIONFISH Advanced Sensor Package (FLS): Provides for procurement of Advanced Sensor Package Forward Look Sonar-9 inch (FLS-9), which will be employed in support of Expeditionary Mine Countermeasures. Capabilities include obstacle avoidance, volume target detection and intelligence preparation of the environment (IPOE) missions. This procurement supports the capacity growth of the Navy's Expeditionary MCM force to 18 companies over the FYDP. These sensors will outfit companies 13-18. Lionfish Advanced Sensor Package included $0 of discretionary funding, and $6,653k of mandatory funding for a quantity of 6 Forward Looking Sonar (FLS). The FY2026 mandatory funds support additional procurements of advanced sensors to accelerate attainment of the inventory objective of these sensors to detect underwater moored mines in the volume. (3) 3.1.3 VIPERFISH (MEMUUV): These resources procure the next generation of deep water variant vehicles of the Maritime Expeditionary MCM UUV. This procurement supports the capacity growth of the Navy's Expeditionary MCM force to 18 companies over the FYDP. FY28 unit cost increases reflect the inclusion of FLS-9. Going forward, FLS-9 is integrated into vehicle procurement costs due to its status as a required sensor for VF operations. Viperfish (Deep Water UUV) included $0 of discretionary funding, and $23,683k of mandatory funding for a quantity of 7 Deep water capable next generation UUVs. The FY2026 mandatory funds support initial procurements of Viperfish and associated equipment to accelerate attainment of Deep Water UUVs to equip 6 newly established ExMCM companies that require deep water Mine Countermeasure capability. LI 1611 - Small & Medium UUV Navy UNCLASSIFIED Page 9 of 16 P-1 Line #34 Volume 1 - 633 === page 712 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 P-1 Line Item Number / Title: 1611 / Small & Medium UUV ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Small & Medium UUV MDAP/MAIS Code: (4) CE 3.1.4 LIONFISH MSE: These resources procure the Mission Support Equipment (MSE) for the Small Maritime Expeditionary MCM UUV family of systems. The requisite MSE includes, but is not limited to, shipboard charging containers and specifically outfitted UUV maintenance support shelter. Charging containers will increase cost of MSE. Lithium-ion battery safety test was performed and determined this to be a requirement. The increase in FY2027 realigns Mission Support Computer (MSC), IT Kits, and Visual Automatic Target Recognition (V-ATR) Common Module (VCM) and VCM integration costs from CE 3.1.1 into 3.1.5 to ensure all T-Rex and MSE procurement items are transparent. Lionfish Mission Support Equipment (MSE) included $0 of discretionary funding, and $23,526k of mandatory funding for a quantity of 17 Mission Support Equipment sets. The FY2026 mandatory funds support additional procurements of additional MSE sets in support of the additional UUV procurements. MSE includes storage/maintenance shelters, battery charging, sensor integration kits, transport carts, containers, and other support equipment essential for safe and effective operation and maintenance of the Lionfish UUVs (5) CE 3.1.6 MEMUUV Production Engineering: Funding supports the increased production of MEMUUV family of systems requiring additional production support to include production contract award, first article test, factory acceptance tests and government acceptance testing. This line enables the rapid and seamless transition from development to production, which is critical to the schedule for delivery of these Expeditionary MCM UUVs. The Navy's Expeditionary MCM Capacity is growing to 18 companies over the course of the FYDP which requires additional and accelerated production of equipment by industry and government partners. In FY 2027, funding will also be required for support of Forward Looking Sonar (FLS) procurement. Increase in Production Engineering requirements from FY28-FY29 due to stand-up and initiation of Viperfish full rate production capability alongside Lionfish full rate production. Expeditionary UUV Production Engineering included $0 of discretionary funding, and $14,234k of mandatory funding to surge production engineering efforts for both the Lionfish and Viperfish programs, including UUV lines, various support equipment lines, and advanced sensor payloads lines, commensurate with the dramatic increase in mandatory funding procurement of UUVs, advanced sensors, and mission support equipment in FY26. (6) CE 3.1.7 MEMUUV INITIAL TRAINING: Funding provides resources needed due to the increase in training requirements due to fielding of new systems and incremental upgrades to existing systems. This training is required based on execution of acquisition programs. Increase in Initial Training funding in FY28 due to Viperfish introduction to fleet while Lionfish training ongoing. Expeditionary UUV Initial Training included $0 of discretionary funding, and $1,878k of mandatory funding to surge initial training efforts for both the Lionfish and Viperfish programs, commensurate with the dramatic increase in mandatory funding procurement and subsequent deliveries of UUVs and associated equipment. (7) (8) (9) CE 4.1.1 Supports funding across the FYDP for partial procurement of support equipment. CE 4.1.2 FY 2027 NSW will procure four LIONFISH SUUV and support equipment. CE 5.1.1 TETRA: Increase in FY 2027 to fund 2 Remotely Operated Vehicles (ROV) and 1 TETRA System Shipset per year across the FYDP, vice incrementally funding TETRA System Shipsets prior to FY 2026. Each TETRA System Shipset contains a mission-dependent payload package and payload ancillary equipment to support installation and operations in the torpedo room. Large increase in FY 2027 due to funding for classified capabilities. (10) CE 5.1.2 TETRA: TETRA Ancillary Equipment Kits include (5) vehicle fiber packs, (2) Launch and Recovery Canisters (L&RC), (5) launcher fiber packs, (2) Control and Display Consoles (C&DCs), (1) VIRGINIA Stowage Pallet (VSP), and (1) Special Tools and Test Equipment (STTE) kit, TEMPALT Stowage Containers (TGSCs), Cradle Stowage Containers (CSCs), loading poles, bridging trays, Voice Over IP Phone (VOIP), junction boxes, mission control laptops, toughpads, Fiber Optic Penetrator (FOP) support equipment, etc. Funding increase in FY 2027 required to fully fund TETRA System Shipset Ancillary Equipment Kits, vice incrementally funding TETRA System Shipset Ancillary Equipment Kits prior to FY 2027. Additional funding increase to support TETRA-owned torpedo room equipment, previously borrowed from legacy system Shipsets. (11) CE 5.1.3 TETRA: The TETRA system is comprised of ROVs equipped with various payload(s). Each TETRA System Shipset contains a mission-dependent payload package and payload ancillary equipment. Multiple payloads were developed & selected in FY22 and FY23, prior to a Shipset payload being selected by the resource sponsor. Increase in FY27 from FY26 is due to increase in unit quantity and variation in payload package unit cost, which is driven by complexity of mission-specific payload requirements. (12) The Classified Project program is an operational capability addressing specific Combatant Commander's evolving and emergent operational requirements. Spiral developments to meet the evolving threat will leverage ongoing Navy, DARPA, and commercial research efforts including processing and command and control technology. The project will continue to operationalize the effectiveness of Government-owned classified mission payloads focused on delivering military effects within the designated AOR. (13) (14) Razorback CE 8.1.5: Funding to procure 2 next generation MK19 vehicles in FY27 Razorback CE 8.1.6: Razorback MK19 Sub Support Systems consist of submarine modification kits in support of Razorback MK19 deployment, as well as Razorback MK19 vehicle operational and maintenance equipment. (15) (16) (17) Razorback CE 8.1.7: A SAFECAP consists of operational and maintenance equipment required to safely ship, stow, and deploy a Razorback vehicle from a submarine torpedo tube. Razorback CE 8.1.9: Funding supports PPR battery upgrade kits. CE 8.1.1 Razorback Classified Payload Vehicle FY27 funding will support procurement of the first two vehicles. LI 1611 - Small & Medium UUV Navy UNCLASSIFIED Page 10 of 16 P-1 Line #34 Volume 1 - 634 === page 713 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 P-1 Line Item Number / Title: 1611 / Small & Medium UUV ID Code (A=Service Ready, B=Not Service Ready) : (18) Item Number / Title [DODIC]: 1 / Small & Medium UUV MDAP/MAIS Code: CE 8.12 Classified Payload FY27 funding will support procurement of the first classified payload. LI 1611 - Small & Medium UUV Navy UNCLASSIFIED Page 11 of 16 P-1 Line #34 Volume 1 - 635 === page 714 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Cost Elements O O C Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Small & Medium UUV Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2025 Huntington Ingalls Industries , HII / Pocasset, MA C / FFP NAVSEA Nov 2024 Feb 2025 12 1,358K N Nov 2025 3.1.2) LIONFISH Advanced Sensor Package (FLS) 2027 ARL / UT C / FFP ** NO PCO ** Aug 2027 Aug 2027 2 1,059K N Aug 2027 3.1.3) VIPERFISH (DEEPWATER UUV) 2027 Huntington Ingalls Industries , HII / Pocasset, MA C / FFP ** NO PCO ** Jun 2027 Jun 2027 2 2,275K N Jun 2027 2025 Huntington Ingalls Industries , HII / Pocasset, MA C / FFP ** NO PCO ** Nov 2024 Nov 2025 3 1,631K N Nov 2025 2027 Huntington Ingalls Industries , HII / Pocasset, MA C / TBD ** NO PCO ** Nov 2026 Nov 2026 2 1,507K N Nov 2026 2025 Hydroid, Inc / MA C / FFP ** NO PCO ** Mar 2025 Mar 2026 3 1,486K Y 3.1.1) LIONFISH (SUUV) (†) (†) 3.1.4) LIONFlSH MSE (†) 3.1.4) LIONFlSH MSE 4.1.2) NSW LIONFISH (†) (Each) RFP Issue Date 5.1.1) TETRA - Remotely Operated Vehicle (ROV) 2024 Oceaneering (19) / Hanover, MD Various ** NO PCO ** Jan 2024 Sep 2025 3 1,309K Y Dec 2023 5.1.1) TETRA - Remotely Operated Vehicle (ROV) 2025 Oceaneering (19) / Hanover, MD Various ** NO PCO ** Jan 2025 Sep 2026 1 1,397K Y Jul 2024 5.1.2) Ancillary Equipment Kit TETRA 2024 Oceaneering / Hanover, MD Various ** NO PCO ** Jan 2024 Dec 2026 1 3,364K Y Dec 2023 5.1.3) Payload Packages - TETRA 2025 Applied Research Lab / Austin, Tx Various ** NO PCO ** Oct 2024 Dec 2025 2 597,500.00 Y Jun 2024 2025 Huntington Ingalls Industries , HII / Pocasset, MA C / TBD ** NO PCO ** Apr 2026 Oct 2026 5 1,856K N (†) 2027 TBD / TBD C / TBD TBD Mar 2027 Mar 2028 2 2,800K N Feb 2026 6.1.6) Razorback MK19 Sub Support Equipment 2027 TBD / TBD C / TBD TBD Dec 2026 Dec 2027 2 1,500K N Feb 2026 6.1.7) Razorback MK19 SAFECAP 2027 TBD / TBD C / TBD TBD Dec 2026 Dec 2027 2 1,200K N Feb 2026 6.1.9) Razorback MK19 PPR Battery Kits 2027 New MFG - Name / New MFG - Loc C / TBD NUWC NPT Dec 2026 Dec 2027 2 260,000.00 N Feb 2026 2027 TBD / TBD C / TBD TBD Mar 2027 Mar 2028 2 2,800K N Feb 2026 2027 TBD / TBD C / TBD TBS Dec 2026 Dec 2027 2 1,100K N Feb 2026 6.1.1) Razorback MK19 Upgrades/ Backfits 6.1.5) Razorback MK19 Vehicle Procurement 7.1.1) Razorback Classified (†) Payload Vehicle 7.1.4) SAFECAP (†) P-1 Line Item Number / Title: 1611 / Small & Medium UUV indicates the presence of a P-21 Footnotes: (19) Initial procurement utilized in-house components. Reorder procurement lead time refined once initial procurement with Oceaneering was accomplished in FY22. LI 1611 - Small & Medium UUV Navy UNCLASSIFIED Page 12 of 16 P-1 Line #34 Volume 1 - 636 === page 715 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1611 / Small & Medium UUV Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Cost Elements (Units in Each) O O C M F R # FY SERVICE 3.1.1) LIONFISH (SUUV) PROC QTY Item Number / Title [DODIC]: 1 / Small & Medium UUV Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 25 1 2025 NAVY 3.1.4) LIONFlSH MSE 12 0 12 A - - - 12 A - - - - 0 (4) Prior Years Deliveries: 9 2 2025 NAVY 3 0 3 2 2027 NAVY 2 0 2 0 3 4.1.2) NSW LIONFISH - - - - - - - 3 2 (8) Prior Years Deliveries: 11 3 2025 NAVY 3 6.1.5) Razorback MK19 Vehicle Procurement 4 2027 NAVY 2 7.1.1) Razorback Classified Payload Vehicle 5 2027 NAVY 2 A - - - - - - - 3 (13) 0 2 2 (17) 0 2 2 O C T LI 1611 - Small & Medium UUV Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #34 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 637 === page 716 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1611 / Small & Medium UUV Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Cost Elements (Units in Each) O O C M F R # FY SERVICE 3.1.1) LIONFISH (SUUV) PROC QTY Item Number / Title [DODIC]: 1 / Small & Medium UUV Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 25 1 2025 NAVY 3.1.4) LIONFlSH MSE 12 12 0 0 (4) Prior Years Deliveries: 9 2 2025 NAVY 3 0 3 2 2027 NAVY 2 0 2 0 3 4.1.2) NSW LIONFISH - 3 0 A2 0 (8) Prior Years Deliveries: 11 3 2025 NAVY 3 6.1.5) Razorback MK19 Vehicle Procurement 4 2027 NAVY 2 7.1.1) Razorback Classified Payload Vehicle 5 2027 NAVY 2 - - - - - 3 0 (13) 0 2 A - - - - - - - 2 - 2 (17) 0 2 A O C T LI 1611 - Small & Medium UUV Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #34 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 638 === page 717 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1611 / Small & Medium UUV Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Cost Elements (Units in Each) O O C M F R # FY SERVICE 3.1.1) LIONFISH (SUUV) PROC QTY Item Number / Title [DODIC]: 1 / Small & Medium UUV Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 25 1 2025 NAVY 3.1.4) LIONFlSH MSE 12 12 0 0 (4) Prior Years Deliveries: 9 2 2025 NAVY 3 3 0 0 2 2027 NAVY 2 2 0 0 3 0 0 4.1.2) NSW LIONFISH (8) Prior Years Deliveries: 11 3 2025 NAVY 3 6.1.5) Razorback MK19 Vehicle Procurement 4 2027 NAVY 2 7.1.1) Razorback Classified Payload Vehicle 5 2027 NAVY 2 (13) 0 2 - - - - - 2 0 (17) 0 2 O C T LI 1611 - Small & Medium UUV Navy N O V D E C J A N F E B 1 M A R 1 A P R 0 M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #34 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 639 === page 718 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1611 / Small & Medium UUV Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Item Number / Title [DODIC]: 1 / Small & Medium UUV Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Huntington Ingalls Industries , HII - Pocasset, MA 75 2 Huntington Ingalls Industries , HII - Pocasset, MA TBD ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 Hydroid, Inc - MA 1 6 6 12 0 0 0 12 0 12 12 4 TBD - TBD 2 2 4 8 5 12 17 0 1 12 13 5 TBD - TBD 1 2 4 8 5 12 17 0 1 12 13 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1611 - Small & Medium UUV Navy UNCLASSIFIED Page 16 of 16 P-1 Line #34 Volume 1 - 640 === page 719 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 15: Other Ship Support ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1612 / Large UUV Program Elements for Code B Items: 0604031N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - 0.000 0.000 0.000 1.358 1.395 1.423 - - - - 0.000 0.000 0.000 - - - 0.000 0.000 0.000 222.998 222.998 222.998 0.000 0.000 0.000 222.998 222.998 222.998 208.236 208.236 208.236 To FY 2031 Complete - - - - 1.358 1.395 1.423 - - - - - 1.358 1.395 1.423 - Total 435.410 435.410 435.410 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Dragonfish Large Unmanned Underwater Vehicle (LUUV) addresses a priority Fleet requirement for a below-water Intelligence, Surveillance, and Reconnaissance (ISR) task with classification of targets of interest and activation of a purpose-built payload. The system consists of a vehicle, a payload, and a support system. The Dragonfish LUUV is the result of a Defense Innovation Unit (DIU) Commercial Solutions Opening (CSO) that assessed commercially available LUUVs. Dragonfish provides the ability to have a dispersed, long range, persistent underwater sensing and payload delivery platform to use in a contested environment. The platform will be large diameter, scalable, low-cost autonomous unmanned system with persistent reach and payload capacity to conduct desired mission sets. LI 1612 - Large UUV Navy UNCLASSIFIED Page 1 of 6 P-1 Line #35 Volume 1 - 641 === page 720 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 1612 / Large UUV Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 15: Other Ship Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: 0604031N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Large UUV P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 0.000 - / 0.000 - / 0.000 - / 222.998 - / 0.000 - / 222.998 - / 0.000 - / 0.000 - / 0.000 - / 222.998 - / 0.000 - / 222.998 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY2027 funds support full rate production at a unit cost of $4,884 thousand per vehicle, based on DIU prototype design OTA cost in FY2026. An allocation of $4,902 thousand for support systems includes handling equipment such as trailers, tow hitches, straps, and forklift, all the items necessary to move the vehicles around from storage to the water. Remaining $1,893 thousand for production engineering, supports program management and reporting. LI 1612 - Large UUV Navy UNCLASSIFIED Page 2 of 6 P-1 Line #35 Volume 1 - 642 === page 721 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1612 / Large UUV Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Large UUV MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 - - - 0.000 0.000 0.000 - - - 0.000 0.000 0.000 - - - 0.000 0.000 0.000 FY 2027 Base FY 2027 OOC - - 222.998 FY 2027 Total - 0.000 - 222.998 - 222.998 - 0.000 - 222.998 - 222.998 - 0.000 222.998 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - Dragonfish Cost Non Recurring Cost (†) (1) - - - - - - - - - 4,805K 45 216.203 - - - 4,805K 45 216.203 1.1.2) Support System - - - - - - - - - - - 4.902 - - - - - 4.902 1.1.3) Production Engineering - - - - - - - - - - - 1.893 - - - - - 1.893 Subtotal: Non Recurring Cost - - - - - - - - - - - 222.998 - - - - - 222.998 Subtotal: Hardware Dragonfish Cost - - - - - - - - - - - 222.998 - - - - - 222.998 Gross/Weapon System Cost - - 0.000 - - 0.000 - - 0.000 - - 222.998 - - 0.000 - - 222.998 1.1.1) Dragonfish Remarks: [Hardware] Dragonfish system consists of a vehicle, a payload, and a support system. (†) indicates the presence of a P-5a Footnotes: (1) unit cost based on the production OTA unit costs from DIU with an escalation of three percent from the prototype OTA costs LI 1612 - Large UUV Navy UNCLASSIFIED Page 3 of 6 P-1 Line #35 Volume 1 - 643 === page 722 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Cost Elements 1.1.1) Dragonfish (†) (†) O O C FY 2027 (2) P-1 Line Item Number / Title: 1612 / Large UUV Contractor and Location Method/Type or Funding Vehicle Anduril / North Kingstown, RI TBD Item Number / Title [DODIC]: 1 / Large UUV Location of PCO Award Date Date of First Delivery NAVSEA Jan 2027 Jul 2027 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) 45 4,805K Y RFP Issue Date Feb 2026 indicates the presence of a P-21 Footnotes: (2) Dates and vendors are based on initial procurement estimates and will be updated based on awards LI 1612 - Large UUV Navy UNCLASSIFIED Page 4 of 6 P-1 Line #35 Volume 1 - 644 === page 723 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1612 / Large UUV Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Dragonfish 1 2027 PROC QTY Item Number / Title [DODIC]: 1 / Large UUV Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P J U N J U L A U G S E P B A L A N C E (1) NAVY LI 1612 - Large UUV Navy 45 0 45 A J A N F E B M A R A P R M A Y J U N 4 J U L 4 A U G UNCLASSIFIED Page 5 of 6 4 S E P 4 O C T 4 N O V 4 D E C 4 J A N 4 F E B P-1 Line #35 4 M A R 4 A P R 5 M A Y 0 Volume 1 - 645 === page 724 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1612 / Large UUV Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Item Number / Title [DODIC]: 1 / Large UUV Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Anduril - North Kingstown, RI MSR For 2027 1-8-5 For 2027 MAX For 2027 3 45 50 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 3 6 Total After Oct 1 ALT Prior to Oct 1 9 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 6 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1612 - Large UUV Navy UNCLASSIFIED Page 6 of 6 P-1 Line #35 Volume 1 - 646 6 === page 725 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 15: Other Ship Support ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1613 / Extra Large UUV Program Elements for Code B Items: 0604536N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 0.000 0.000 0.000 - - - 0.000 0.000 0.000 - - - 0.000 0.000 0.000 135.802 135.802 135.802 0.000 0.000 0.000 135.802 135.802 135.802 243.359 243.359 243.359 286.965 286.965 286.965 292.019 292.019 292.019 To FY 2031 Complete 167.273 Continuing 167.273 167.273 Total - Continuing Continuing Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Combat Autonomous Maritime Platform (CAMP) Extra Large Unmanned Undersea Vehicle (XLUUV) is a Navy's Extra Large UUV effort as part of the Family of UUVs. CAMP XLUUV is a multi-phased accelerated acquisition effort to rapidly deliver capability to the Fleet. CAMP XLUUV's will have a modular payload bay, with defined interfaces that will support current and future payloads. The XLUUV effort will include support of future systems and integration of current and future payloads. Providing the Navy with unprecedented optionality for scalable payloads and sensor suites tailored for missions ranging from surveillance to strike. Liberator is a stationary undersea system positioned on the seabed for operationally relevant durations to provide payloads in designated areas to partially address capability gaps. The FY 2026 spend plan for Extra Large Unmanned Undersea Vehicle includes $0 thousand of discretionary and $3,313 thousand of mandatory (reconciliation) for a total of $3,313 thousand. The mandatory funds support equipment costs and readiness for XLUUV. LI 1613 - Extra Large UUV Navy UNCLASSIFIED Page 1 of 6 P-1 Line #36 Volume 1 - 647 === page 726 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 1613 / Extra Large UUV Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 15: Other Ship Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: 0604536N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Extra Large UUV P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 0.000 - / 0.000 - / 0.000 - / 135.802 - / 0.000 - / 135.802 - / 0.000 - / 0.000 - / 0.000 - / 135.802 - / 0.000 - / 135.802 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 request for Extra Large Unmanned Undersea Vehicles (XLUUV) includes $135,802 thousand Other Procurement, Navy. This funding supports the CAMP projects' first year of production with two XLUUV vendors after a prototyping effort in FY 2026. XLUUV Vehicle production (1.1.2) is estimated at $120,000 thousand based procurement of three vehicles at a unit price of $40,000 thousand per vehicle, estimated based on prototype pricing from two vendors with a payload deployment module that is continuing to be prototyped in FY 2026 under a Defense Innovation Unit Prototype Other Transaction Authority Agreement. Production Engineering (1.1.1) is estimated at $7,944 thousand to support production-related engineering change proposals (ECPs) for first-article builds, software and cybersecurity ECPs for firstarticle builds, acceptance testing, initial training, and production related data deliverables for vehicle operations and maintenance by Fleet operators. Support Equipment (1.1.3) is estimated at $7,858 thousand to support procurement of refueling and recharging equipment, Packaging Shipping, Handling and Transportation (PHS&T) equipment, and Common Support Equipment (CSE) to enable fleet operations of the vehicles. LI 1613 - Extra Large UUV Navy UNCLASSIFIED Page 2 of 6 P-1 Line #36 Volume 1 - 648 === page 727 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 1613 / Extra Large UUV Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Extra Large UUV MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 - - - 0.000 0.000 0.000 - - - 0.000 0.000 0.000 - - - 0.000 0.000 0.000 FY 2027 Base FY 2027 OOC - - 135.802 FY 2027 Total - 0.000 - 135.802 - 135.802 - 0.000 - 135.802 - 135.802 - 0.000 135.802 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware - XLUUV Cost Recurring Cost 1.1.1) Production Engineering 1.1.2) XLUUV (†) (1) Vehicle 1.1.3) Support Equipment - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 27.944 - - - 80.000 - - - - 27.858 - - - - - 27.858 40,000K 2 - - 40,000K 27.944 2 80.000 Subtotal: Recurring Cost - - - - - - - - - - - 135.802 - - - - - 135.802 Subtotal: Hardware - XLUUV Cost - - - - - - - - - - - 135.802 - - - - - 135.802 Gross/Weapon System Cost - - 0.000 - - 0.000 - - 0.000 - - 135.802 - - 0.000 - - 135.802 (†) indicates the presence of a P-5a Footnotes: (1) unit cost estimated based on prototype pricing from two vendors with a payload deployment module that being prototyped in FY 2026 under DIU LI 1613 - Extra Large UUV Navy UNCLASSIFIED Page 3 of 6 P-1 Line #36 Volume 1 - 649 === page 728 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Cost Elements (†) 1.1.2) XLUUV Vehicle (†) O O C FY Contractor and Location 2027 Anduril (2) / Quonset Point, RI P-1 Line Item Number / Title: 1613 / Extra Large UUV Method/Type or Funding Vehicle Various Item Number / Title [DODIC]: 1 / Extra Large UUV Location of PCO Award Date Date of First Delivery NAVSEA Aug 2027 May 2028 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) 2 40,000K Y RFP Issue Date Feb 2026 indicates the presence of a P-21 Footnotes: (2) Dates and vendors are based on initial procurement estimates and will be updated based on awards LI 1613 - Extra Large UUV Navy UNCLASSIFIED Page 4 of 6 P-1 Line #36 Volume 1 - 650 === page 729 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1613 / Extra Large UUV Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.2) XLUUV Vehicle 1 2027 NAVY PROC QTY Item Number / Title [DODIC]: 1 / Extra Large UUV Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P J U N J U L A U G S E P B A L A N C E (1) 2 LI 1613 - Extra Large UUV Navy 0 2 A A U G UNCLASSIFIED Page 5 of 6 S E P O C T N O V D E C J A N F E B P-1 Line #36 M A R A P R 2 M A Y 0 Volume 1 - 651 === page 730 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 1613 / Extra Large UUV Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 15 Item Number / Title [DODIC]: 1 / Extra Large UUV Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Anduril (2) - Quonset Point, RI MSR For 2027 1-8-5 For 2027 MAX For 2027 1 2 8 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 9 Total After Oct 1 ALT Prior to Oct 1 9 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 9 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (2) Dates and vendors are based on initial procurement estimates and will be updated based on awards LI 1613 - Extra Large UUV Navy UNCLASSIFIED Page 6 of 6 P-1 Line #36 Volume 1 - 652 9 === page 731 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 16: Logistic Support ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1610 / LSD Midlife & Modernization Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 768.575 768.575 768.575 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 49.044 4.079 0.240 0.000 0.240 1.120 1.123 1.133 1.155 - - - - - - - - - - - 49.044 4.079 0.240 0.000 0.240 1.120 1.123 1.133 1.155 - - - - - - - - - - - 49.044 4.079 0.240 0.000 0.240 1.120 1.123 1.133 1.155 - Total 826.469 826.469 826.469 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Modernized LSD 41/49 Class ships transport and launch amphibious craft and vehicles with their crews and embarked personnel in amphibious assault operations. Supporting amphibious operations include landings via Landing Craft, Air Cushion (LCAC), conventional landing craft, and helicopters, onto hostile shores. [P40A / ST5IN LSD Installation / DSA / AIT]: Planned effort by the Alteration Installation Teams (AITs) and the Design Support Activity (DSA) to address ship's growing obsolescence issues and maintenance intensive areas via support in the Modernization Availabilities. [P40A / Slewing Arm Davit (SLAD) Embarkation Platform Installation]: LSD Class ships require an embarkation platform for loading and unloading of personnel during launch and recovery operations utilizing the new Lake Shore Inc. Slewing Arm Davit (SLAD). The upgrade is required due to limited space in the area of the 11M RIB stowage, which limits the ability of the crew to efficiently load and unload personnel, particularly during recovery operations. [P40A / Slewing Arm Davit (SLAD) Installation]: This SHIPALT replaces the Welin Lambie LUM 12A or Lakeshore Gravity Boat Davit currently installed on LSD 41/49 Class ships, with a new Slewing Arm Davit (SLAD) from Oldenburg Group Inc. The existing systems will be removed and the OGI SLAD will be installed in the same general location of the current systems. The new system is a SLAD design with single point pick up of the boats versus the two points pick up used by the existing systems. [P40A / Ballast Control Console (BCC)]: Provides upgrades to the existing Ballast Control Consoles (BCC) and replaces legacy BCC with a Programmable Logic Controller (PLC) based digital, networked system. This mission and safety critical SCD address system degradation due to obsolescence issues, extensive downtime and reduced system capability/reliability. The system is currently operating in a degraded capacity and requires immediate replacement. [P40A / Damage Control Console (DCC)]: This SCD upgrades the existing Damage Control (DC) Console and interior communication sensor monitoring (IC/SM) alarm panels within Damage Control Central on-board ship with a Programmable Logic Controller (PLC) based control system that will provide all current functionality and utilizes the Advanced Engineering Control System (AECS) network backbone. The software will leverage the LSD 47 interface for system screen layout and user interaction but will be developed using the current Platform Independent Machinery Control System (PIMCS) software architecture and includes the Advanced Damage Control System (ADCS) hardware and software. ADCS provides real-time, dynamic ship status and parametric information, and accepts feedback on actions taken by watch standers. LI 1610 - LSD Midlife & Modernization Navy UNCLASSIFIED Page 1 of 6 P-1 Line #37 Volume 1 - 653 === page 732 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 16: Logistic Support ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1610 / LSD Midlife & Modernization Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A / LSD MOD HM&E Conjunctive Alterations]: The LSD Hull, Mechanical and Electrical (HM&E) Condition System implements HM&E alteration package that supports LSD safety and cyber critical concerns while addressing maintenance intensive and growing obsolescence associated with the 49 Class. LI 1610 - LSD Midlife & Modernization Navy UNCLASSIFIED Page 2 of 6 P-1 Line #37 Volume 1 - 654 === page 733 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 1610 / LSD Midlife & Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N: Other Procurement, Navy / BA 01: Ships Support Equipment / BSA 16: Logistic Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a LSD Midlife P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 768.575 - / 49.044 - / 4.079 - / 0.240 - / 768.575 - / 49.044 - / 4.079 - / 0.240 - / - - / 0.240 / 0.000 - / 0.240 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding supports continuation of engineering services and integrated logistics support efforts pertaining to the ongoing FY25 and FY26 CNO availabilities. Other intended efforts include system engineering support and equipment integration in preparation for FY27 SRA. Applicable alterations supported under this tasking include Ballast Control Console upgrade, Damage Control Console upgrades, and Slewing Arm Davit. LI 1610 - LSD Midlife & Modernization Navy UNCLASSIFIED Page 3 of 6 P-1 Line #37 Volume 1 - 655 === page 734 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1610 / LSD Midlife & Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 16 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS ($) Code 1) ST5IN LSD Installation / DSA / AIT 1.1) Damage Control Console (DCC) Unit Cost A Installation A (†) Installation 1.3) Slewing Arm Davit (SLAD) Embarkation Platform Installation A 1.4) Slewing Arm Davit (SLAD) Installation A 1.5) LSD 46 FY18 EDSRA Installation / AIT A 1.6) LSD 46 C4I Systems AIT A 1.7) LSD 46 Special Selected Restricted Availability (SSRA) A 1.8) LSD Design Services Allocation (DSA) A Subtotal: 1) ST5IN LSD Installation / DSA / AIT 2) ST001 - LSD Mod HM&E Modernization 2.1) Ballast Control Console (BCC) A 2.2) Damage Control Console (DCC) A 2.3) Canned Lube Oil Pump A 2.4) LSD MOD HM&E Conjunctive A Alterations (3) Subtotal: 2) ST001 - LSD Mod HM&E Modernization (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) (1) (†) 1.2) Ballast Control Console (BCC) Qty FY 2025 Total Cost Aggregated Items Title: LSD Midlife - - - 4,588K 3 13.765 - - - - - - - - - - - - - - - 5,525K 3 16.576 - - - - - - - - - - - - - - - - - 5.514 - - - - - - - - - - - - - - 3.989 - - - - - - - - - - - - - - - - - 61.548 - - - - - - - - - - - - - - - - - 10.000 - - - - - - - - - - - - - - - - - 9.400 - - - - - - - - - - - - - - - - - 10.428 - - 0.961 - - - - - - - - - - - - - - 95.365 - - 36.816 - - - - - - - - - - - - - - 3.312 - - 1.261 - - - - - - - - - - - - - - 4.774 - - 0.979 - - - - - - - - - - - - - - 16.543 - - - - - - - - - - - - - - - - - 41.523 - - 9.988 - - 4.079 - - 0.240 - - - - - 0.240 - - 66.152 - - 12.228 - - 4.079 - - 0.240 - - - - - 0.240 - - 19.429 - - - - - - - - - - - - - - - - - 1.759 - - - - - - - - - - - - - - - (2) 3) Other Prior Year Costs 3.1) ST001 LSD MOD C4I System A 3.2) ST003 LSD Hull, Mechanical and A LI 1610 - LSD Midlife & Modernization Navy UNCLASSIFIED Page 4 of 6 P-1 Line #37 Volume 1 - 656 === page 735 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 1610 / LSD Midlife & Modernization Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 16 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 3.3) ST001 - LSD MOD Combat System A 3.4) All Other Prior Year Costs A 3.5) ST002 - Propeller Blades & PLMU A 3.6) ST002 Generators & Elect Distribution A 3.7) ST002 Low Pressure Air Compressor A 3.8) ST002 - Steering Control System A 3.9) ST002 - LSD Deck Crane A 3.10) ST002 - Ballast Control Console A Electrical Condition System MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: LSD Midlife FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - - 7.456 - - - - - - - - - - - - - - - - - 459.382 - - - - - - - - - - - - - - - - - 20.990 - - - - - - - - - - - - - - - - - 21.770 - - - - - - - - - - - - - - - - - 18.809 - - - - - - - - - - - - - - - - - 54.308 - - - - - - - - - - - - - - - - - 2.661 - - - - - - - - - - - - - - - - - 0.494 - - - - - - - - - - - - - - - Subtotal: 3) Other Prior Year Costs - - 607.058 - - - - - - - - - - - - - - - Total - - 768.575 - - 49.044 - - 4.079 - - 0.240 - - - - - 0.240 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) Industrial Award for Avails is required 120 days prior to Avail start to allow Industry Planners to schedule work/personnel and order non-GFE material. For Avails/Installations beginning in October thru January, contract must be awarded in prior year. Installation funding for a ship is divided over a three-year period. Installation execution funding in the year of availability, and Design Service Allocation (DSA) in the two years prior to the availability, and DSA in the year prior to the availability. This includes ship checks, ship installation drawing (SID) development, logistic document development and long lead time material (LLTM) procurements. Installation costs across the FYDP may vary depending on current port rates. Port rates are updated every year by a Command Navy Regional Maintenance Center (CNRMC) letter based on the forecasted port loading model. Port loading rate forecasts are the rates recommended for all budgeted maintenance and organic modernization within a specific port. Individual ship's availability durations vary dependent upon the integration of a ship's maintenance and modernization work packages. (2) (3) BCC and DCC long lead time material procurement (LLTM) estimated to be 18 months with Navy Modernization Process (NMP) milestone material delivery requirement of 120 days. FY 2027 funding for conjunctive alterations supports continuation of CNO availabilities initiated in FY25 and FY26. Conjunctive Alterations are planned in support of six total HM&E modernization installations for LSD 49, 51 and 52. Intended efforts include system engineering, equipment integration, and integrated logistics support. Alterations planned for execution are Ballast Control Console upgrade, Damage Control Console upgrades, and Slewing Arm Davit. LI 1610 - LSD Midlife & Modernization Navy UNCLASSIFIED Page 5 of 6 P-1 Line #37 Volume 1 - 657 === page 736 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1810N / 01 / 16 Aggregated Items: LSD Midlife FY Contractor and Location Method/Type or Funding Vehicle 1.1) Damage Control Console (DCC) Installation 2025 TBD via NSWCPD / TBD C / TBD TBD Aug 2025 Nov 2026 3 4,588K N Sep 2025 1.2) Ballast Control Console (BCC) Installation 2025 TBD via NSWCPD / TBD C / TBD TBD Aug 2025 Nov 2026 3 5,525K N Sep 2025 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 1610 / LSD Midlife & Modernization Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) ST5IN LSD Installation / DSA / AIT LI 1610 - LSD Midlife & Modernization Navy UNCLASSIFIED Page 6 of 6 P-1 Line #37 Volume 1 - 658