=== page 1 === DEPARTMENT OF THE NAVY FISCAL YEAR (FY) 2027 BUDGET ESTIMATES JUSTIFICATION OF ESTIMATES April 2026 MILITARY CONSTRUCTION RESERVE PROGRAM (MCNR) === page 2 === THIS PAGE INTENTIONALLY LEFT BLANK === page 3 === The estimated cost of this report for the Department of the Navy (DON) is $7,123. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. === page 4 === FY2027 Summary Discretionary and Mandatory Funding ($ in thousands) Table 1: Funding Overview Discretionary Military Construction, Navy Reserve Mandatory Military Construction, Navy Reserve Total FY 2025 ($K) FY 2026 ($K) FY 2027 ($K) $ 29,829 $ 52,255 $ 132,272 $ 29,829 $ 52,255 $ 132,272 $ $ 19,000 $ $ $ 19,000 $ $ 29,829 $ 71,255 $ 132,272 MANDATORY FUNDING JUSTIFICATION: The FY 2027 request for Military Construction includes $132,272 thousand of discretionary and $0 thousand of mandatory (reconciliation) for a total of $132,272 thousand. The FY 2026 amount for Military Construction includes $52,255 thousand of discretionary and $19,000 thousand of mandatory (reconciliation) for a total of $71,255 thousand. === page 5 === THIS PAGE INTENTIONALLY LEFT BLANK === page 6 === DEPARTMENT OF THE NAVY FY 2027 Military Construction, Navy and Marine Corps Reserve Program Table of Contents STATE LIST i INDEX OF LOCATIONS iii INDEX OF LOCATIONS (NAVY) v INDEX OF LOCATIONS (MARINES) vii MISSION STATUS INDEX ix APPROPRIATION LANGUAGE xi SPECIAL PROGRAM CONSIDERATIONS xiii PROJECT JUSTIFICATIONS - INSIDE THE US 1 DESIGN 15 UNSPECIFIED MINOR CONSTRUCTION 17 === page 7 === THIS PAGE INTENTIONALLY LEFT BLANK === page 8 === DEPARTMENT OF THE NAVY FY 2027 Military Construction, Navy and Marine Corps Reserve Program Summary of Locations Auth Request ($000) Approp Request ($000) Subtotal 47,000 0 47,000 47,000 56,870 103,870 Subtotal Total - FY 2027 Military Construction, Navy and Marine Corps Reserve Program 28,402 28,402 75,402 28,402 28,402 132,272 State/Country Inside The United States FLORIDA TEXAS Various Locations Various Locations i === page 9 === THIS PAGE INTENTIONALLY LEFT BLANK ii === page 10 === DEPARTMENT OF THE NAVY FY 2027 Military Construction, Navy and Marine Corps Reserve Program Index of Locations for Navy and Marine Corps Projects State/ Cntry Proj No. Location Inside The United States Auth Request ($000) Approp Request Mission ($000) Status Page No. 47,000 47,000 47,000 47,000 Current 47,000 47,000 3 56,870 Current 56,870 56,870 103,870 11 Subtotal Total - TEXAS Total - Inside The United States 0 0 0 47,000 Various Locations 526 Design 535 Unspecified Minor Construction Total - Various Locations Total - Grand Total 25,880 2,522 28,402 75,402 25,880 Current 2,522 Current 28,402 132,272 15 17 FLORIDA MARINE CORPS RESERVE FORCES JACKSONVILLE, FLORIDA 115 Ramp Expansion & RTC Subtotal Total - FLORIDA TEXAS NAS FORT WORTH JRB TX JRB FORT WORTH, TEXAS 1050 Hangar 1050 Modernization (INC) iii === page 11 === THIS PAGE INTENTIONALLY LEFT BLANK iv === page 12 === DEPARTMENT OF THE NAVY FY 2027 Military Construction, Navy and Marine Corps Reserve Program Index of Locations for Navy Projects State/ Cntry Proj No. Location Inside The United States Auth Request ($000) Approp Request Mission ($000) Status Page No. 0 0 0 0 56,870 Current 56,870 56,870 56,870 11 Subtotal Total - TEXAS Total - Inside The United States Various Locations 526 Design 535 Unspecified Minor Construction Total - Various Locations Total - Grand Total 25,880 2,522 28,402 28,402 25,880 Current 2,522 Current 28,402 85,272 15 17 TEXAS NAS FORT WORTH JRB TX JRB FORT WORTH, TEXAS 1050 Hangar 1050 Modernization (INC) v === page 13 === THIS PAGE INTENTIONALLY LEFT BLANK vi === page 14 === DEPARTMENT OF THE NAVY FY 2027 Military Construction, Navy and Marine Corps Reserve Program Index of Locations for Marine Corps Projects State/ Cntry Proj No. Location Inside The United States Auth Request ($000) Approp Request Mission ($000) Status Page No. 47,000 47,000 47,000 47,000 47,000 Current 47,000 47,000 47,000 3 Subtotal Total - FLORIDA Total - Inside The United States Total - Grand Total 47,000 47,000 FLORIDA MARINE CORPS RESERVE FORCES JACKSONVILLE, FLORIDA 115 Ramp Expansion & RTC vii === page 15 === THIS PAGE INTENTIONALLY LEFT BLANK viii === page 16 === DEPARTMENT OF THE NAVY FY 2027 Military Construction, Navy and Marine Corps Reserve Program Mission Status Index Installation/Location Inside The United States FLORIDA MARINE CORPS RESERVE FORCES JACKSONVILLE, FLORIDA TEXAS NAS FORT WORTH JRB TX JRB FORT WORTH, TEXAS Proj No. Project Title Approp Request Mission ($000) Status 115 Ramp Expansion & RTC 47,000 Current 1050 Hangar 1050 Modernization (INC) 56,870 Current 526 Design 535 Unspecified Minor Construction 25,880 Current 2,522 Current Various Locations VARIOUS LOCATIONS Various Locations Various Locations ix === page 17 === THIS PAGE INTENTIONALLY LEFT BLANK x === page 18 === DEPARTMENT OF THE NAVY FY 2027 Military Construction, Navy and Marine Corps Reserve Program Appropriation Language SECTION 1 - APPROPRIATION LANGUAGE For construction, acquisition, expansion, rehabilitation, and conversion of facilities for the training and administration of the reserve components of the Navy and Marine Corps as authorized by chapter 1803 of title 10, United States Code, and Military Construction Authorization Acts, [$52,255,000] $132,272,000, to remain available until September 30, [2030] 2031: Provided, That, of the amount, not to exceed [$2,255,000] $25,880,000 shall be available for study, planning, design, and architect and engineer services, as authorized by law, unless the Secretary of the Navy determines that additional obligations are necessary for such purposes and notifies the Committees on Appropriations of both Houses of Congress of the determination and the reasons therefor. SECTION 2 - EXPLANATION OF LANGUAGE CHANGES 1. Deletion of 2026 appropriations shown in brackets. xi === page 19 === THIS PAGE INTENTIONALLY LEFT BLANK xii === page 20 === DEPARTMENT OF THE NAVY FY 2027 Military Construction, Navy and Marine Corps Reserve Program Special Program Considerations POLLUTION ABATEMENT: The military construction projects in this program will be designed to meet environmental standards. The Military construction projects proposed are primarily for the abatement of existing pollution problems at Naval and Marine Corps installations and have been reviewed to ensure that corrective design is accomplished in accordance with specific standards and criteria. ENERGY CONSERVATION: The military construction projects proposed in this program will be designed for minimum energy consumption. FLOODPLAIN MANAGEMENT AND WETLANDS PROTECTION: Proposed land acquisition, disposals, and installation construction projects have been planned to allow the proper management of floodplains and the protection of wetlands by avoiding long and short-term adverse impacts, reducing the risk of flood losses, and minimizing the loss or degradation of wetlands. Project planning is in accordance with the requirements of Executive Order Numbers 11988 and 11990. DESIGN FOR ACCESSIBILITY OF PHYSICALLY HANDICAPPED PERSONNEL: In accordance with Public Law 90-480, provisions for physically handicapped personnel will be provided for, where appropriate, in the design of facilities included in this program. PRESERVATION OF HISTORICAL SITES AND STRUCTURES: Facilities included in this program do not directly or indirectly affect a district, site, building, structure, object or setting listed in the National Register of Historic Places, except as noted on the DD Form 1391. PLANNING IN THE NATIONAL CAPITAL REGION: Projects located in the National Capital Region are submitted to the National Capital Planning Commission for budgetary review and comment as part of the commission's annual review of the Future Years Defense Program (FYDP). Construction projects within the District of Columbia, with the exception of the Bolling/Anacostia area, are submitted to the Commission for approval prior to the start of construction. ENVIRONMENTAL PROTECTION: In accordance with Section 102(2)(c) of the National Environmental Policy Act of 1969 (Public Law 91-190), the environmental impact analysis process has been completed or is actively underway for all projects in the military construction program. ECONOMIC ANALYSIS: Economics are an inherent aspect of project development and design of military construction projects. Therefore, all projects included in this program represent the most economical use of resources. Where alternatives could be evaluated, a primary economic analysis was prepared. CONSTRUCTION CRITERIA MANUAL: Project designs conform to Part II of Military Handbook 1190, "Facility Planning and Design Guide." RESERVE MANPOWER POTENTIAL: The reserve manpower potential to meet and maintain authorized strengths of all reserve flying/non-flying units in those areas in which these facilities are to be located has been reviewed. It has been determined, in coordination with the other services having reserve flying /non-flying units in these areas, that the number of units of the reserve components of the Armed Forces presently located in those areas, and those which have been allocated to the areas for futures activation, is not and will not be larger than the number that reasonably can be expected to be maintained at authorization strength considering the number of persons living in the areas who are qualified for membership in those reserve units. xiii === page 21 === THIS PAGE INTENTIONALLY LEFT BLANK xiv === page 22 === 1. Component NAVY 2. Date APR 2026 FY 2027 MILITARY CONSTRUCTION PROGRAM 3. Installation(SA) & Location/UIC: M67861 (EG) MARINE CORPS RESERVE FORCES (JACKSONVILLE FL MAINT) JACKSONVILLE, FLORIDA 4. Area Const Cost Index 5. Frequency And Type Of Utilitization: Empty 6. Other Active/Guard/Reserve Installations Within 15 Miles: Empty 7. Projects Requested In This Program: Design Start 04/2025 Cat Code Project Title 17115 Ramp Expansion & RTC Status Complete 06/2026 Scope 3,143 m2 Cost ($000) 47,000 TOTAL 47,000 8. State Reserve Forces Facilities Board Recommendation: Empty 9. Land Acquisition Required: Empty 10. Projects Planned In Next Four Years: Cat Code Title 61010 test Cost ($000) 1,510,000 11. Personnel Strength: TOTAL As of 30-Sep-26 Authorized: Actual: PERMANENT OFF ENL CIV GUARD/RESERVE TOTAL OFF ENL 12. Reserve Unit Data: NONE 13. Major Equipment And Aircraft: NONE 14. Outstanding Pollution and Safety Deficiencies ($000): A. Pollution Abatement(*): B. Occupational Safety and Health (OSH)(#): DD1390 Form 1 Dec 76 Submitted to CONGR April 2026 0 0 PAGE NO. 1 === page 23 === 1. Component NAVY FY 2027 MILITARY CONSTRUCTION PROGRAM 3. Installation(SA) & Location/UIC: M67861 (EG) MARINE CORPS RESERVE FORCES (JACKSONVILLE FL MAINT) JACKSONVILLE, FLORIDA 2. Date APR 2026 4. Area Const Cost Index Blank Page DD1390C Form 1 Dec 76 Submitted to CONGR April 2026 PAGE NO. 2 === page 24 === 1. Component NAVY 3. Installation(SA) & Location/UIC: M67861 (EG) MARINE CORPS RESERVE FORCES (JACKSONVILLE FL MAINT) JACKSONVILLE, FLORIDA 5. Program Element 0815976N 2. Date APR 2026 FY 2027 MILITARY CONSTRUCTION PROGRAM 6. Category Code 17115 4. Project Title Ramp Expansion & RTC 7. Project Number P115 8. Project Cost ($000) 47,000 9. Cost Estimates Item Ramp Expansion & RTC RESERVE CENTER CC17115 (33,831SF) (RENOVATE) WEBB BUILDING MAINT FACILITY CC21410 (14,714SF) TRAINING AREA ROADS CC85111 (95,993SF) (RENOVATE) OVERHEAD COVER CC12317 (16,609SF) ORGANIC SUPPLY STORAGE FACILITY CC44112 (2,099SF) TACTICAL VEHICLE WASH PLATFORM CC14962 GATE/SENTRY HOUSE CC73025 INFORMATION SYSTEMS BUILT-IN EQUIPMENT SPECIAL COSTS OPERATIONS & MAINTENANCE SUPP INFO (OMSI) SUPPORTING FACILITIES PAVEMENT FACILITIES SITE PREPARATIONS PAVING AND SITE IMPROVEMENTS ELECTRICAL UTILITIES MECHANICAL UTILITIES ENVIRONMENTAL MITIGATION DEMOLITION SUBTOTAL CONTINGENCY (5.0%) TOTAL CONTRACT COST SIOH (6.5%) SUBTOTAL TOTAL REQUEST ROUNDED TOTAL REQUEST EQUIPMENT FROM OTHER APPROPRIATIONS (NON ADD) UM LS m2 Quantity 3,143 4,005.00 Cost ($000) 31,380 (12,590) m2 1,367 7,037.00 (9,620) m2 8,918 65.72 (590) m2 m2 1,543 195 2,304.00 4,006.00 (3,560) (780) EA EA LS LS LS LS 1 1 872,700.00 186,796.00 (870) (190) (300) (900) (1,560) (420) LS LS LS LS LS LS LS LS Unit Cost 10,650 (1,850) (1,160) (3,400) (790) (2,680) (370) (400) 42,030 2,100 44,130 2,870 47,000 47,000 47,000 (1,840) 10. Description of Proposed Construction: Constructs facilities required to field the amphibious combat vehicle (ACV) platform replacement of the legacy assault amphibious vehicle (AAV). The project also reconfigures the Marine Corps Reserve Center (MCRC), Jacksonville site to accommodate ACV circulation within the MCRC site. Renovates and repairs the Reserve Training Center (RTC). Includes repairs and replacement of finishes and systems (life safety, mechanical, plumbing, electrical, DD1391 Form 1 Dec 76 Submitted to CONGR April 2026 PAGE NO. 3 === page 25 === 1. Component NAVY FY 2027 MILITARY CONSTRUCTION PROGRAM 3. Installation(SA) & Location/UIC: M67861 (EG) MARINE CORPS RESERVE FORCES (JACKSONVILLE FL MAINT) JACKSONVILLE, FLORIDA 5. Program Element 0815976N 6. Category Code 17115 2. Date APR 2026 4. Project Title Ramp Expansion & RTC 7. Project Number P115 8. Project Cost ($000) 47,000 10. Description of Proposed Construction:(Continued) lighting and lighting controls). Exterior renovations include but are not limited to resealing exterior wall openings, painting exterior surfaces, replacing exterior awnings, gutters, downspouts and demolishing inoperative solar panels and associated electrical gear. Replacing damaged exterior and interior doors and door hardware. Renovations include room reconfigurations creating a new conference room, a new breakroom, open office space, new medical suite, new command suite, five new spaces in the supply storage, and adding hose bibbs and floor drains in the equipment storage room. Expands and repairs the Vehicle Maintenance Facility (VMF), Building 001. Building expansion includes demolition of the single-story administration wing and fire pump room, and construction of a two-story administration wing with a fire pump room, latrines, storage and a vehicle maintenance bay that includes a bridge crane (10ton). Exterior renovations include but are not limited to resealing exterior wall openings, painting exterior surfaces, demolishing inoperative solar panels and associated electrical gear, replacing the metal roof, facias, gutters, downspouts, metal wall panels, exterior and interior doors and door hardware. Interior renovations include repairs and replacement of finishes and systems (life safety, mechanical, plumbing, electrical, vehicle oil distribution system, air compressor and air dryer, lighting and lighting controls). Routing the wastewater through an oil/water collection interceptor; replacing the 100kA surge protective devices (SPD) at electrical panels. Improve the 4,000 LF southern training trail. Improvements include widening the entire trail to 16-feet wide, with sections widened to 24-feet wide at approximately 500-foot intervals to allow for vehicle passing. The trail surface will be a roller-compacted crush and run material. An 8,000 SF concrete paved area will be constructed at the ACV launch point. Construct overhead covers for two safety boats (2,200 SF), tactical vehicle wash platform (3,360 SF), and 17 ACVs(11,440 SF). Construction includes concrete foundations, steel structures, sloped standing-seam metal roofs, metal siding and lighting. The overhead covers are to be sited to accommodate ACV site circulation. Construct an Organic Storage Supply (OSS) facility storage building. Construction includes concrete foundation, knee walls, and slab, steel structure, sloped standing-seam metal roof, metal siding and lighting. This facility is to be sited to accommodate ACV site circulation. Construct a vehicle wash platform. Construction includes water service, vehicle washing area, sanitary sewer collection, grit chamber, oil/water separator, pump station and hose connections. This facility is to be sited to accommodate ACV site circulation and align with the vehicle maintenance facility, Building 001. Construct a security guardhouse at the entrance to the MCRC Jacksonville site. Construction includes concrete foundation and slab, pre-fabricated guardhouse building with steel structure, metal roof, metal siding, lighting, heating, ventilation and air conditioning. Facility-related control systems include cybersecurity features in accordance with current Department of War (DoW) criteria. This project will provide Antiterrorism (AT) features and comply with applicable service and Geographic Combatant Commander policies and directive per Unified Facilities Criteria (UFC) for DoW Minimum Antiterrorism Standards for Building. DD1391C Form 1 Dec 76 Submitted to CONGR April 2026 PAGE NO. 4 === page 26 === 1. Component NAVY FY 2027 MILITARY CONSTRUCTION PROGRAM 3. Installation(SA) & Location/UIC: M67861 (EG) MARINE CORPS RESERVE FORCES (JACKSONVILLE FL MAINT) JACKSONVILLE, FLORIDA 5. Program Element 0815976N 6. Category Code 17115 2. Date APR 2026 4. Project Title Ramp Expansion & RTC 7. Project Number P115 8. Project Cost ($000) 47,000 10. Description of Proposed Construction:(Continued) Special costs include Post Construction Award Services (PCAS) and cybersecurity commissioning. The cybersecurity commissioning cost is to cover the Department of Navy (DON) in-house cost to review contractor submittals and to implement steps necessary for obtaining Authority to Operate. Operations and Maintenance Support Information (OMSI) is included in this project. Department of Dow and DON principles for high-performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and executive orders. Low Impact Development will be included in the design and construction of this project as appropriate. Site preparations include site and building demolition, vegetation clearing and grubbing, utility relocations, grading and storm water management to include Low Impact Development items. Mechanical utilities include potable and fire protection water distribution upgrades to site, the wash platform and VMF addition; sanitary sewer collection to the wash platform and VMF addition; relocation of sanitary sewer lift station and piping; relocation of fire hydrants; and storm water drainage systems. Pavements include combat vehicle parking and circulation, and privately owned vehicle (POV) parking for approximately 100 vehicles and constructing a parking apron and refueling area to include exterior lighting, water and storm water collection system with oil/water separator. Constructs a concrete pad for four 200 SF hazardous materials modular storage shelters in proximity of the vehicle maintenance facility Building 001. Site improvements include grading, fencing, gates and landscaping. Environmental mitigation includes the purchase of in-lieu-fee wetland credits equivalent to approximately 1.8 acres of wetland impacts. The project demolishes Building OH1, Building 007, Building 007A, Building 16, and fire pump room of Building 001 VMF, Building GS, Garbage Stand, and a 125,000-gallon aboveground fire water storage tank. Facilities will be designed to meet, or exceed, the useful service life specified in the DoW UFC. Facilities will incorporate features that provide the lowest practical life-cycle cost solutions that satisfy the facility requirements with the goal of maximizing energy efficiency. DD1391C Form 1 Dec 76 Submitted to CONGR April 2026 PAGE NO. 5 === page 27 === 1. Component NAVY FY 2027 MILITARY CONSTRUCTION PROGRAM 3. Installation(SA) & Location/UIC: M67861 (EG) MARINE CORPS RESERVE FORCES (JACKSONVILLE FL MAINT) JACKSONVILLE, FLORIDA 5. Program Element 0815976N 6. Category Code 17115 11. Requirement: 3,143 m2 4. Project Title Ramp Expansion & RTC 7. Project Number P115 Adequate: 2. Date APR 2026 8. Project Cost ($000) 47,000 Substandard: PROJECT: Repair, renovate, and construct facilities and site improvements at MCRC Jacksonville, Florida to field the amphibious combat vehicle (ACV) platform replacement of the legacy AAV. (Current Mission) (Current Mission) REQUIREMENT: U.S. Marine Corps Forces Reserve (MARFORRES) Bravo Company, Fourth Assault Amphibian Battalion, Fourth Marine Division, Jacksonville, Florida requires an purpose-built facility to support fielding of 17 ACVs. This project supports the change in amphibious maintenance, operations and training requirements, and is consistent with the Commandant of the Marine Corps Force Design Requirements. The unit provides amphibious, ground vehicle and equipment maintenance, and training required to deploy the landing force and their equipment effectively and safely from assault shipping to inland objectives in a single lift. The unit requires an RTC to support training and operations, a site entry guard house, a VMF, storage, an armory, operational training instructional space, hazardous material/flammable storage, a wash platform, vehicle/equipment overhead canopies, combat vehicle paving and POV parking. CURRENT SITUATION: Facilities and site configuration do not support the fielding of 17 ACVs. Repair and renovation of the current primary and supporting facilities along with new construction and relocation of primary facilities is required to support the fielding of 17 ACVs. The Reserve Center facility is a single-story Marine Corps RTC constructed in 2007. Aged finishes, mechanical equipment and electrical systems require repair or replacement. Building renovations are required to align the operational functions to meet ACV support requirements. The Webb facility is a single-story VMF constructed in 2007. To meet ACV requirements, the VMF will require an additional maintenance bay and administrative space, and repairs and renovations to the current maintenance bays. The current administrative space will be demolished to create space for the additional administrative space and maintenance bay. The Overhead Covers were constructed in 2007 and will be replaced to meet ACV requirements. The Organic Supply Storage facility is a fabric structure over a prefabricated steel wall and roof truss system. The facility was assembled in 2010 as a dehumidification facility and will be replaced to meet ACV requirements. This project falls within two flood hazard areas representing a one percent and 0.2 percent chance of flood over a one-year period. This is a non-essential facility. The design flood elevation is seven feet above sea level. The flood risk will be mitigated by ensuring the finished floor elevation meets or exceeds the design flood elevation. IMPACT IF NOT PROVIDED: If this project is not provided, the additional personnel and equipment associated with ACV platform replacement will remain in facilities that fall short of operational space requirements as well as life, health, and safety standards creating a negative effect on mission readiness. Equipment will be under constant exposure to the elements while stored outside with inadequate protections, resulting in undue wear and tear, accelerated deterioration of equipment, and DD1391C Form Submitted to CONGR PAGE NO. 6 1 Dec 76 April 2026 === page 28 === 1. Component NAVY FY 2027 MILITARY CONSTRUCTION PROGRAM 3. Installation(SA) & Location/UIC: M67861 (EG) MARINE CORPS RESERVE FORCES (JACKSONVILLE FL MAINT) JACKSONVILLE, FLORIDA 5. Program Element 0815976N 6. Category Code 17115 2. Date APR 2026 4. Project Title Ramp Expansion & RTC 7. Project Number P115 8. Project Cost ($000) 47,000 11. Requirement:(Continued) IMPACT IF NOT PROVIDED:(Continued) continual and costly maintenance. 12. Supplemental Data: A. Estimated Execution Data: (1) Acquisition Strategy: Design Bid Build (2) Design Data: (a) Date or Request for Proposal (RFP) Started: Apr/2025 (b) Percent of Design Completed as of Sep 2025: 35% (c) Percent of Design Completed as of Jan 2026: 40% (d) Design or RFP Complete: Jun/2026 (e) Total Design Cost ($000): $4,230 (f) Energy Study and/or Life Cycle Analysis performed: No (g) Standard or definitive design used: No (3) Construction Data: (a) Contract Award: Mar/2027 (b) Construction Start: Apr/2027 (c) Construction Complete: Mar/2029 B. Equipment associated with this project which will be provided from other appropriations: Equipment Nomenclature Furniture, Fixtures, & Equipment (FF&E) Fiscal Year Procuring Appropriated Appropriation or Requested 2028 Cost ($000) 1,840 CERTIFYING OFFICIAL STATEMENT: Assistant Deputy Commandant Installations and Logistics (Facilities) certifies that this project has been considered for joint use potential. Unilateral construction is recommended. The State Joint Services Reserve Component Facilities Board has reviewed this project for joint use potential. That board determined that unilateral construction is the best alternative to support this mission. Activity POC: NAVFAC HQ MILCON Program Manager DD1391C Form 1 Dec 76 Submitted to CONGR April 2026 Phone No: 202-549-6272 PAGE NO. 7 === page 29 === 1. Component NAVY FY 2027 MILITARY CONSTRUCTION PROGRAM 3. Installation(SA) & Location/UIC: M67861 (EG) MARINE CORPS RESERVE FORCES (JACKSONVILLE FL MAINT) JACKSONVILLE, FLORIDA 5. Program Element 0815976N 6. Category Code 17115 2. Date APR 2026 4. Project Title Ramp Expansion & RTC 7. Project Number P115 8. Project Cost ($000) 47,000 Blank Page DD1391C Form 1 Dec 76 Submitted to CONGR April 2026 PAGE NO. 8 === page 30 === 1. Component NAVY FY 2027 MILITARY CONSTRUCTION PROGRAM 3. Installation(SA) & Location/UIC: N83447 NAS FORT WORTH JRB TX JRB FORT WORTH, TEXAS 2. Date APR 2026 4. Area Const Cost Index 5. Frequency And Type Of Utilitization: Empty 6. Other Active/Guard/Reserve Installations Within 15 Miles: Empty 7. Projects Requested In This Program: Cat Code Project Title 21105 Hangar 1050 Modernization (INC) Design Start 10/2023 Status Complete 07/2025 Scope 19,112 m2 TOTAL Cost ($000) 56,870 56,870 8. State Reserve Forces Facilities Board Recommendation: Empty 9. Land Acquisition Required: Empty 10. Projects Planned In Next Four Years: NONE 11. Personnel Strength: As of 30-Sep-26 TOTAL Authorized: Actual: PERMANENT OFF ENL CIV GUARD/RESERVE TOTAL OFF ENL 12. Reserve Unit Data: NONE 13. Major Equipment And Aircraft: NONE 14. Outstanding Pollution and Safety Deficiencies ($000): A. Pollution Abatement(*): B. Occupational Safety and Health (OSH)(#): DD1390 Form 1 Dec 76 Submitted to CONGR April 2026 0 0 PAGE NO. 9 === page 31 === 1. Component NAVY FY 2027 MILITARY CONSTRUCTION PROGRAM 3. Installation(SA) & Location/UIC: N83447 NAS FORT WORTH JRB TX JRB FORT WORTH, TEXAS 2. Date APR 2026 4. Area Const Cost Index Blank Page DD1390C Form 1 Dec 76 Submitted to CONGR April 2026 PAGE NO. 10 === page 32 === 1. Component NAVY FY 2027 MILITARY CONSTRUCTION PROGRAM 3. Installation(SA) & Location/UIC: N83447 NAS FORT WORTH JRB TX JRB FORT WORTH, TEXAS 5. Program Element 6. Category Code 21105 2. Date APR 2026 4. Project Title Hangar 1050 Modernization (INC) 7. Project Number P1050 8. Project Cost ($000) 56,870 9. Cost Estimates Item HANGAR 1050 MODERNIZATION (INC) (205,720SF) HANGAR WITH CRANES CC21105 (205,720SF) (RENOVATE) CYBERSECURITY FEATURES BUILT-IN EQUIPMENT SPECIAL COSTS OPERATIONS & MAINTENANCE SUPP INFO (OMSI) SUPPORTING FACILITIES ELECTRICAL UTILITIES SUBTOTAL CONTINGENCY (5.0%) TOTAL CONTRACT COST SIOH (6.5%) SUBTOTAL TOTAL REQUEST ROUNDED TOTAL REQUEST UM m2 Quantity 19,112 m2 19,112 Unit Cost 4,470.99 Cost ($000) 94,650 (85,450) LS LS LS LS (500) (2,560) (4,780) (1,360) LS LS 920 (920) 95,570 4,780 100,350 6,520 106,870 106,870 56,870 10. Description of Proposed Construction: Renovates the interior and exterior of Hangar 1050 including towers 1, 2, 3 and 4 to better accommodate crew, equipment, and administrative spaces. Interior renovations include repairs and replacement of finishes and systems (mechanical, plumbing, electrical, lighting, data, and life safety) at towers. Exterior renovations include refinishing and repairing of the hangar doors and egress components and replacement of the hangar roof. Hangar bay renovation installs floor coating and converts office area into aircraft maintenance bay. Additional modifications include installation of flight equipment storage area at tower 4, insulation and installation of protective cladding at towers, renovations of restrooms, replacement of the compressed air system, demolition of tower 4 bridge crane and towers 1, 2 and 3 elevators, installation of a mezzanine access stair in tower 4, modifications to provide Architectural Barriers Act (ABA) compliance in tower 4, and reconstruction of new protected egress path from towers 2 and 3. This project will be occupied and remain operational during construction. Facility-related control systems include cybersecurity features in accordance with current Department of War (DoW) criteria. This project will provide Antiterrorism features and comply with applicable service and Geographic Combatant Commander policies and directive per Unified Facilities Criteria (UFC) for DoW Minimum Antiterrorism Standards for Buildings. Built-in equipment includes a power supply, two bridge cranes (3-tons), a passenger/freight combination elevator, and lockers. Special costs include cyber security commissioning, Post Construction Contract Award Services (PCAS), and third-party commissioning. The cybersecurity commissioning cost is to cover the Navy (DON) cybersecurity requirements as well as the DONs in-house costs to review contractor submittals and to implement steps necessary for obtaining DD1391 Form 1 Dec 76 Submitted to CONGR April 2026 PAGE NO. 11 === page 33 === 1. Component NAVY FY 2027 MILITARY CONSTRUCTION PROGRAM 3. Installation(SA) & Location/UIC: N83447 NAS FORT WORTH JRB TX JRB FORT WORTH, TEXAS 5. Program Element 6. Category Code 21105 2. Date APR 2026 4. Project Title Hangar 1050 Modernization (INC) 7. Project Number P1050 8. Project Cost ($000) 56,870 10. Description of Proposed Construction:(Continued) Authority to Operate. Operations and Maintenance Support Information (OSMI) is included in this project. DoW and Department of the Navy principles for high performance and sustainable building requirements will be included in the design and construction of the project in accordance with federal laws and Executive Orders. Low Impact Development will be included in the design and construction of this project as appropriate. Facilities will be designed to meet or exceed the useful service life specified in DoW Unified Facility Criteria. Facilities will incorporate features that provide the lowest practical life cycle cost solutions satisfying the facility requirements with the goal of maximizing energy efficiency. 11. Requirement: 19,112 m2 Adequate: Substandard: PROJECT: Renovates the interior and exterior of Hangar 1050 including towers 1, 2, 3, and 4 to better accommodate crew, equipment, and administrative spaces. (Current Mission) REQUIREMENT: The U.S. Marine Corps Forces Reserve (MARFORRES) requires crew, equipment, and administrative space in conjunction with hangar 1050. The hangar bay of hangar 1050 requires an additional KC-130J parking space for additional maintenance capability. CURRENT SITUATION: Hangar 1050 is a large hangar that is used for storage and maintenance of cargo planes. The interior of the hangar contains four separate towers that house administrative offices and maintenance shops for the Marine Corps reservists. The facility was built in 1955, with a Building Condition Index (BCI) of 82, a condition rating of 78, and a configuration rating of 64. Tower 4 recently had renovation work started but was left in an incomplete state. There are unfinished trim-outs, plumbing issues in the ground floor restrooms, and other incomplete items. The ground floor restrooms are inoperable due to a plumbing malfunction that causes water to backflow out of the toilet in the opposite restroom when a toilet is flushed. Towers 1 through 3 are aged facilities, and most components are well past their service lives. There is evidence of leaks in the ceilings or in wall-mounted airconditioning units that have caused damage to the ceiling tiles and floors throughout the years. The service elevators in towers 1 through 4 are in need of repair. The hangar roof has evidence of damage in various areas and is in need of repair. The mechanical, electrical, and plumbing systems are beyond their useful life and are not compliant with current codes and standards. DD1391C Form 1 Dec 76 Submitted to CONGR April 2026 PAGE NO. 12 === page 34 === 1. Component NAVY FY 2027 MILITARY CONSTRUCTION PROGRAM 3. Installation(SA) & Location/UIC: N83447 NAS FORT WORTH JRB TX JRB FORT WORTH, TEXAS 5. Program Element 6. Category Code 21105 2. Date APR 2026 4. Project Title Hangar 1050 Modernization (INC) 7. Project Number P1050 8. Project Cost ($000) 56,870 11. Requirement:(Continued) CURRENT SITUATION:(Continued) The hangar bay of hangar 1050 is large enough to accommodate an additional KC-130J for maintenance, but current construction layouts in that portion of the hangar do not allow for this parking arrangement. The hangar bay flooring is beyond its useful life and does not include proper safety stripping. The compressed air system is not adequate for an additional KC130J bay, nor does it meet the current UFC criteria for aircraft maintenance bays. Additionally, the overhead crane configuration does not provide safe clearance to the KC- 130J aircraft tail causing hazards to personnel and the aircraft. A hangar fire suppression system is provided by a separate project; however, it does not include the additional KC-130J aircraft bay. The hangar does not have sprinklers, mass notification, or fire alarm systems that meet current codes and standards. This project is not within a flood hazard area. This project does not have scope elements above and beyond UFC and Facilities Criteria regarding adverse long-term environmental effects. IMPACT IF NOT PROVIDED: Personnel will continue to work in a facility with components that are deteriorated and unsafe. Out-of-service restrooms and roof leaks will cause parts of the facility to remain unusable, resulting in extensive work-arounds and decreased workforce productivity. The partially renovated area in tower 4 will remain unusable without completion of renovation work. Maintenance operations on KC-130J aircraft will remain limited by the lack of additional functional maintenance bay. The presence of non-allowable combustible materials, inadequate egress pathways, non-compliant life safety systems present hazards to personnel working in the hangar. The present overhead crane configuration restricts safe entry of the KC130J aircraft to maintenance bays. 12. Supplemental Data: A. Estimated Execution Data: (1) Acquisition Strategy: Design Bid Build (2) Design Data: (a) Date or Request for Proposal (RFP) Started: Oct/2023 (b) Percent of Design Completed as of Sep 2025: 15% (c) Percent of Design Completed as of Jan 2026: 35% (d) Design or RFP Complete: Jul/2025 (e) Total Design Cost ($000): $9,618 (f) Energy Study and/or Life Cycle Analysis performed: Yes (g) Standard or definitive design used: No (3) Construction Data: (a) Contract Award: Jan/2027 (b) Construction Start: Feb/2027 (c) Construction Complete: Aug/2030 B. Equipment associated with this project which will be provided from other appropriations: NONE DD1391C Form 1 Dec 76 Submitted to CONGR April 2026 PAGE NO. 13 === page 35 === 1. Component NAVY FY 2027 MILITARY CONSTRUCTION PROGRAM 3. Installation(SA) & Location/UIC: N83447 NAS FORT WORTH JRB TX JRB FORT WORTH, TEXAS 5. Program Element 6. Category Code 21105 2. Date APR 2026 4. Project Title Hangar 1050 Modernization (INC) 7. Project Number P1050 8. Project Cost ($000) 56,870 12. Supplemental Data:(Continued) C. Authorization and Appropriation Summary: Authorization ($000) 106,870 0 106,870 Auth of Approp ($000) 50,000 56,870 106,870 Approp ($000) 50,000 56,870 106,870 FY 2026 Enacted FY 2027 Request Total CERTIFYING OFFICIAL STATEMENT: The Regional Commander certifies that this project has been considered for joint use potential. Joint use is recommended. Activity POC: NAVFAC HQ MILCON Program Manager DD1391C Form 1 Dec 76 Submitted to CONGR April 2026 Phone No: 202-549-6272 PAGE NO. 14 === page 36 === 1. Component NAVY FY 2027 MILITARY CONSTRUCTION PROGRAM 3. Installation(SA) & Location/UIC: N64482 DESIGN UNSPECIFIED, WORLDWIDE LOCATIONS 5. Program Element 0901211N 6. Category Code 61010 2. Date APR 2026 4. Project Title Design 7. Project Number P526 8. Project Cost ($000) 25,880 9. Cost Estimates Item DESIGN DESIGN COSTS SUBTOTAL CONTINGENCY (0.0%) TOTAL CONTRACT COST SIOH (0.0%) SUBTOTAL TOTAL REQUEST ROUNDED TOTAL REQUEST UM LS LS Quantity Unit Cost Cost ($000) 25,880 (25,880) 25,880 0 25,880 0 25,880 25,880 25,880 10. Description of Proposed Construction: Funds to be utilized for architectural and engineering services and construction design in connection with military construction projects including regular program projects, exceptional authority construction (including unspecified minor construction) projects, land appraisals, and other projects as directed. Engineering investigations, such as field surveys and foundation exploration, will be undertaken as necessary. 11. Requirement: Adequate: Substandard: PROJECT: Design funds. (Current Mission) REQUIREMENT: All projects in a military construction program presented for approval must be based on sound engineering and the best cost data available. For this reason, design is initiated to establish project estimates in advance of program submittal to the Congress. Based on this preliminary design, final plans and specifications are then prepared. These costs for architectural and engineering services and construction design are not provided for in the construction project cost estimates except in those where Design/Build contracting method is used. DD1391 Form 1 Dec 76 Submitted to CONGR April 2026 PAGE NO. 15 === page 37 === 1. Component NAVY FY 2027 MILITARY CONSTRUCTION PROGRAM 3. Installation(SA) & Location/UIC: N64482 DESIGN UNSPECIFIED, WORLDWIDE LOCATIONS 5. Program Element 0901211N 6. Category Code 61010 2. Date APR 2026 4. Project Title Design 7. Project Number P526 8. Project Cost ($000) 25,880 Blank Page DD1391C Form 1 Dec 76 Submitted to CONGR April 2026 PAGE NO. 16 === page 38 === 1. Component NAVY FY 2027 MILITARY CONSTRUCTION PROGRAM 3. Installation(SA) & Location/UIC: N64481 MINOR CONSTRUCTION UNSPECIFIED, WORLDWIDE LOCATIONS 5. Program Element 0901211N 6. Category Code 61010 2. Date APR 2026 4. Project Title Unspecified Minor Construction 7. Project Number P535 8. Project Cost ($000) 2,522 9. Cost Estimates Item UNSPECIFIED MINOR CONSTRUCTION UNSPECIFIED MINOR CONSTRUCTION SUBTOTAL CONTINGENCY (0.0%) TOTAL CONTRACT COST SIOH (0.0%) SUBTOTAL TOTAL REQUEST ROUNDED TOTAL REQUEST UM LS LS Quantity Unit Cost Cost ($000) 2,520 (2,520) 2,520 0 2,520 0 2,520 2,520 2,522 10. Description of Proposed Construction: Department of the Navy (DON) unspecified minor military construction (UMC) projects authorized by Title 10 USC 18233(a) and funded by military construction reserve force (MCNR) appropriations. 11. Requirement: Adequate: Substandard: PROJECT: DON UMC projects funded by MCNR appropriations. (Current Mission) REQUIREMENT: A MCNR funded UMC project is a military construction project not otherwise authorized by law having an approved total funded project cost within limits identified for such projects in Title 10 USC 18233(a). A MCNR funded UMC project may be carried out only after the end of the 14 day period beginning on the date on which notification is provided in an electronic medium to the appropriate committees of Congress. DD1391 Form 1 Dec 76 Submitted to CONGR April 2026 PAGE NO. 17 === page 39 === 1. Component NAVY FY 2027 MILITARY CONSTRUCTION PROGRAM 3. Installation(SA) & Location/UIC: N64481 MINOR CONSTRUCTION UNSPECIFIED, WORLDWIDE LOCATIONS 5. Program Element 0901211N 6. Category Code 61010 2. Date APR 2026 4. Project Title Unspecified Minor Construction 7. Project Number P535 8. Project Cost ($000) 2,522 Blank Page DD1391C Form 1 Dec 76 Submitted to CONGR April 2026 PAGE NO. 18 === page 40 === PROJECT SPENDING PLAN Project: FY27 MCON P1050 Hangar 1050 Modernization (INC); Fort Worth, TX Project Cost ($000): $106,870 As of April 2026 FUNDING ($000) Month-Year Oct-25 Nov-25 Dec-25 Jan-26 Feb-26 Mar-26 Apr-26 May-26 Jun-26 Jul-26 Aug-26 Sep-26 Oct-26 Nov-26 Dec-26 Jan-27 Feb-27 Mar-27 Apr-27 May-27 Jun-27 Jul-27 Aug-27 Sep-27 Oct-27 Nov-27 Dec-27 Jan-28 Feb-28 Mar-28 Apr-28 May-28 Jun-28 Jul-28 Aug-28 Sep-28 Oct-28 Nov-28 Dec-28 Monthly $50,000 $56,870 Cumulative $0 $0 $0 $0 $0 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $50,000 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 OBLIGATIONS ($000) Monthly $106,870 OUTLAYS ($000) Cumulative Monthly Cumulative $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $617 $737 $872 $1,023 $1,191 $1,373 $1,570 $1,780 $2,000 $2,229 $2,462 $2,696 $2,926 $3,150 $3,361 $3,555 $3,728 $3,876 $3,995 $4,082 $4,136 $4,154 $4,136 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $617 $1,354 $2,226 $3,249 $4,440 $5,813 $7,383 $9,163 $11,164 $13,392 $15,854 $18,550 $21,476 $24,625 $27,986 $31,541 $35,269 $39,145 $43,140 $47,223 $51,358 $55,512 $59,647 === page 41 === Jan-29 Feb-29 Mar-29 Apr-29 May-29 Jun-29 Jul-29 Aug-29 Sep-29 Oct-29 Nov-29 Dec-29 Jan-30 Feb-30 Mar-30 Apr-30 May-30 Jun-30 Jul-30 Aug-30 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $106,870 $4,082 $3,995 $3,876 $3,728 $3,555 $3,361 $3,150 $2,926 $2,696 $2,462 $2,229 $2,000 $1,780 $1,570 $1,373 $1,191 $1,023 $872 $737 $617 $63,730 $67,725 $71,601 $75,329 $78,884 $82,245 $85,394 $88,320 $91,016 $93,478 $95,706 $97,707 $99,487 $101,057 $102,430 $103,621 $104,644 $105,516 $106,253 $106,870 === page 42 === PROJECT SPENDING PLAN Project: FY27 MCON P1050 Hangar 1050 Modernization (INC); Fort Worth, TX Project Cost ($000): $106,870 As of April 2026 $120,000 $100,000 $80,000 $60,000 $40,000 $20,000 FUNDING ($000) OBLIGATIONS ($000) OUTLAYS ($000) Aug-30 Jun-30 Apr-30 Feb-30 Dec-29 Oct-29 Aug-29 Jun-29 Apr-29 Feb-29 Dec-28 Oct-28 Aug-28 Jun-28 Apr-28 Feb-28 Dec-27 Oct-27 Aug-27 Jun-27 Apr-27 Feb-27 Dec-26 Oct-26 Aug-26 Jun-26 Apr-26 Feb-26 Dec-25 Oct-25 $0 === page 43 === State/Country Florida Florida Florida Michigan New Jersey North Carolina Texas Washington Worldwide unspecified Worldwide unspecified Location BLI Jacksonville P-8A Aircraft Reserve Hangar & Parking Apron Expan Jacksonville Ramp Expansion & RTC Tallahassee Reserve Training Center Modernization Selfridge Air National Guard Reserve Training Center Joint Base Mcguire-Dix-Lakehurst HMH Hangar/Ramp Expansion Charlotte Reserve Training Center Forth Worth Hangar Modernization (INC) Whidbey Island P-8A Aircraft Reserve Hangar Unspecified Worldwide Locations MCNR Unspecified Minor Construction Unspecified Worldwide Locations MCNR Design 1 FY2027 $ $ 47,000,000 $ $ $ $ $ 56,870,000 $ $ 2,522,000 $ 25,880,000 $ 132,272,000 FY2028 $ $ $ 26,900,000 $ $ $ $ $ $ $ 13,451,000 $ 40,351,000 FY2029 $ $ $ $ $ 58,900,000 $ $ $ $ 2,565,000 $ 20,241,000 $ 81,706,000 FY2030 $ 50,000,000 $ $ $ 55,400,000 $ $ $ $ 107,890,000 $ 2,579,000 $ 13,588,000 $ 229,457,000 FY2031 $ $ $ $ $ $ 56,500,000 $ $ $ 2,698,000 $ 13,135,000 $ 72,333,000 === page 44 === THIS PAGE INTENTIONALLY LEFT BLANK