=== page 1 === UNCLASSIFIED Department of War Fiscal Year (FY) 2027 Budget Estimates April 2026 Navy Justification Book Volume 3 of 3 Aircraft Procurement, Navy Budget Activities 06−07 UNCLASSIFIED === page 2 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED === page 3 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Table of Volumes Budget Activities 01-04.....................................................................................................................................................Volume 1 Budget Activity 05............................................................................................................................................................. Volume 2 Budget Activities 06-07.....................................................................................................................................................Volume 3 UNCLASSIFIED Volume 3 - i === page 4 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 3 - ii === page 5 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Volume 3 Table of Contents Cost of Report............................................................................................................................................................. Volume 3 - v Introduction and Explanation of Contents..............................................................................................................Volume 3 - vii Comptroller Exhibit P-1..............................................................................................................................................Volume 3 - ix Master Line Item Table of Contents (by Appropriation then Line Number).................................................... Volume 3 - xxxiii Master Line Item Table of Contents (Alphabetically by Line Item Title)..........................................................Volume 3 - xxxix Line Item Table of Contents (by Appropriation then Line Number)................................................................... Volume 3 - xliii Line Item Table of Contents (Alphabetically by Line Item Title).......................................................................... Volume 3 - xlv Executive Summary................................................................................................................................................Volume 3 - xlvii Exhibit P-40s................................................................................................................................................................ Volume 3 - 1 UNCLASSIFIED Volume 3 - iii === page 6 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 3 - iv === page 7 === APN 1-4 APN 5 APN 6-7 The estimated cost of this report for the Department of the Navy (DON) is $68,465. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. The estimated cost of this report for the Department of the Navy (DON) is $130,360. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. The estimated cost of this report for the Department of the Navy (DON) is $12,149. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. Volume 3 - v === page 8 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 3 - vi === page 9 === Department of Defense Appropriations Act, 2027 Aircraft Procurement, Navy For construction, procurement, production, modification, and modernization of aircraft, equipment, including ordnance, spare parts, and accessories therefore; specialized equipment; expansion of public and private plants, including the land necessary therefore, and such lands and interests therein, may be acquired, and construction prosecuted thereon prior to approval of title; and procurement and installation of equipment, appliances, and machine tools in public and private plants; reserve plant and Government and contractor-owned equipment layaway, $26,947,023,000 to remain available for obligation until September 30, 2029. Volume 3 - vii === page 10 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 3 - viii === page 11 === UNCLASSIFIED Department of War FY 2027 President's Budget Exhibit P-1 Total Obligational Authority DoW Component Summary (Dollars in Thousands) FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total Appropriation Summary FY 2025 Actuals Aircraft Procurement, Navy 15,914,495 17,239,853 509,000 17,748,853 Total Department of the Navy 15,914,495 17,239,853 509,000 17,748,853 Grand Total Department of War 15,914,495 17,239,853 509,000 17,748,853 UNCLASSIFIED Volume 3 - ix === page 12 === UNCLASSIFIED Department of War FY 2027 President's Budget Exhibit P-1 Total Obligational Authority DoW Component Summary (Dollars in Thousands) Appropriation Summary Aircraft Procurement, Navy FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total 26,947,023 7,453,730 34,400,753 Total Department of the Navy 26,947,023 7,453,730 34,400,753 Grand Total Department of War 26,947,023 7,453,730 34,400,753 UNCLASSIFIED Volume 3 - x === page 13 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority Navy Summary (Dollars in Thousands) FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total Appropriation Summary FY 2025 Actuals Aircraft Procurement, Navy 15,914,495 17,239,853 509,000 17,748,853 15,914,495 17,239,853 509,000 17,748,853 Total Department of the Navy UNCLASSIFIED Volume 3 - xi === page 14 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority Navy Summary (Dollars in Thousands) Appropriation Summary Aircraft Procurement, Navy Total Department of the Navy FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total 26,947,023 7,453,730 34,400,753 26,947,023 7,453,730 34,400,753 UNCLASSIFIED Volume 3 - xii === page 15 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Budget Activity Summary (Dollars in Thousands) Appropriation: Aircraft Procurement, Navy FY 2025 Actuals FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total Budget Activity 01. Combat aircraft 7,444,613 03. Trainer aircraft 301,303 04. Other aircraft 522,713 1,116,707 245,000 1,361,707 05. Modification of aircraft 4,328,019 4,730,405 180,000 4,910,405 06. Aircraft spares and repair parts 2,125,592 2,782,627 07. Aircraft support equipment and facilities 1,192,255 930,959 84,000 1,014,959 15,914,495 17,239,853 509,000 17,748,853 Total Aircraft Procurement, Navy UNCLASSIFIED 7,679,155 7,679,155 2,782,627 Volume 3 - xiii === page 16 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Budget Activity Summary (Dollars in Thousands) Appropriation: Aircraft Procurement, Navy FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total Budget Activity 01. Combat aircraft 12,168,296 5,861,940 18,030,236 04. Other aircraft 2,881,450 1,190,000 4,071,450 05. Modification of aircraft 6,269,342 162,000 6,431,342 06. Aircraft spares and repair parts 4,511,417 239,790 4,751,207 07. Aircraft support equipment and facilities 1,116,518 03. Trainer aircraft Total Aircraft Procurement, Navy 26,947,023 UNCLASSIFIED 1,116,518 7,453,730 34,400,753 Volume 3 - xiv === page 17 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2025 Actuals Ident Code Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost Budget Activity 01: Combat aircraft Combat Aircraft 1 F/A-18E/F (Fighter) Hornet A U 2 Joint Strike Fighter CV A U 28,554 17 Less: Advance Procurement (PY) 3 (2,473,555) 29,506 12 (2,096,525) 29,506 12 (2,096,525) (-158,296) (-175,601) (-175,601) 2,315,259 1,920,924 1,920,924 196,634 401,596 401,596 C (FY 2026 for FY 2027) (M) (355,423) (355,423) C (FY 2026 for FY 2028) (M) (46,173) (46,173) Joint Strike Fighter CV Advance Procurement (CY) C (FY 2025 for FY 2026) (M) (175,601) C (FY 2025 for FY 2027) (M) (21,033) C (FY 2027 for FY 2028) (M) C (FY 2027 for FY 2029) (M) 4 JSF STOVL Less: Advance Procurement (PY) U 13 (2,130,050) 11 (1,940,880) 11 (1,940,880) (-158,363) (-153,567) (-153,567) 1,971,687 1,787,313 1,787,313 UNCLASSIFIED Volume 3 - xv === page 18 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Budget Activity 01: Combat aircraft Combat Aircraft 1 F/A-18E/F (Fighter) Hornet A U 2 Joint Strike Fighter CV A U Less: Advance Procurement (PY) 49,088 8 (1,372,163) 49,088 29 37 (-376,456) (5,298,723) (-376,456) 995,707 3 (3,926,560) 3,926,560 4,922,267 Joint Strike Fighter CV Advance Procurement (CY) 651,081 651,081 C (FY 2027 for FY 2028) (M) (598,797) (598,797) C (FY 2027 for FY 2029) (M) (52,284) (52,284) C (FY 2025 for FY 2026) (M) C (FY 2025 for FY 2027) (M) C (FY 2026 for FY 2027) (M) C (FY 2026 for FY 2028) (M) 4 JSF STOVL Less: Advance Procurement (PY) U (180,848) 10 (1,935,380) (-118,485) 62,363 UNCLASSIFIED 10 (2,116,228) (-118,485) 1,935,380 1,997,743 Volume 3 - xvi === page 19 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature 5 FY 2025 Actuals Ident Code Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost JSF STOVL Advance Procurement (CY) 169,389 113,744 113,744 C (FY 2026 for FY 2027) (M) (102,663) (102,663) C (FY 2026 for FY 2028) (M) (11,081) (11,081) C (FY 2025 for FY 2026) (M) (153,567) C (FY 2025 for FY 2027) (M) (15,822) C (FY 2027 for FY 2028) (M) C (FY 2027 for FY 2029) (M) 6 CH-53K (Heavy Lift) Less: Advance Procurement (PY) 7 A U 18 (2,611,848) 14 (2,268,610) 14 (2,268,610) (-418,191) (-347,822) (-347,822) 2,193,657 1,920,788 1,920,788 422,971 335,352 335,352 C (FY 2026 for FY 2027) (M) (332,498) (332,498) C (FY 2026 for FY 2028) (M) (1,591) (1,591) C (FY 2026 for FY 2029) (M) (1,263) (1,263) CH-53K (Heavy Lift) Advance Procurement (CY) C (FY 2025 for FY 2026) (M) (347,822) C (FY 2025 for FY 2027) (M) (21,653) C (FY 2025 for FY 2028) (M) (25,474) C (FY 2025 for FY 2029) (M) (28,022) UNCLASSIFIED Volume 3 - xvii === page 20 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature 5 FY 2027 Discretionary Request Ident Code Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost JSF STOVL Advance Procurement (CY) 77,963 77,963 C (FY 2027 for FY 2028) (M) (62,278) (62,278) C (FY 2027 for FY 2029) (M) (15,685) (15,685) C (FY 2025 for FY 2026) (M) C (FY 2025 for FY 2027) (M) C (FY 2026 for FY 2027) (M) C (FY 2026 for FY 2028) (M) 6 CH-53K (Heavy Lift) Less: Advance Procurement (PY) 7 A U 22 (3,398,601) 22 (3,398,601) (-354,151) (-354,151) 3,044,450 3,044,450 429,295 429,295 CH-53K (Heavy Lift) Advance Procurement (CY) C (FY 2025 for FY 2026) (M) C (FY 2025 for FY 2027) (M) C (FY 2025 for FY 2028) (M) C (FY 2025 for FY 2029) (M) C (FY 2026 for FY 2027) (M) C (FY 2026 for FY 2028) (M) C (FY 2026 for FY 2029) (M) UNCLASSIFIED Volume 3 - xviii === page 21 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2025 Actuals Ident Code Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost C (FY 2027 for FY 2028) (M) 8 V-22 (Medium Lift) U 30,118 47,196 47,196 9 H-1 Upgrades (UH-1Y/AH-1Z) A U 8,701 8,305 8,305 10 P-8A Poseidon A U 12,424 13,631 13,631 11 E-2D Adv Hawkeye A U 95,219 12 E-2D Adv Hawkeye 3 1,100,800 3 1,100,800 Advance Procurement (CY) C (FY 2027 for FY 2028) (M) C (FY 2027 for FY 2029) (M) Total Combat aircraft 7,444,613 7,679,155 7,679,155 Budget Activity 03: Trainer aircraft Trainer Aircraft 14 Multi-Engine Training System (METS) Total Trainer aircraft A U 27 301,303 301,303 UNCLASSIFIED Volume 3 - xix === page 22 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec Qty Cost C (FY 2027 for FY 2028) (M) FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost (429,295) (429,295) 5,974 5,974 8 V-22 (Medium Lift) U 9 H-1 Upgrades (UH-1Y/AH-1Z) A U 10 P-8A Poseidon A U 12 4,227,350 12 4,227,350 11 E-2D Adv Hawkeye A U 6 2,075,025 6 2,075,025 12 E-2D Adv Hawkeye Advance Procurement (CY) C (FY 2027 for FY 2028) (M) C (FY 2027 for FY 2029) (M) 550,000 550,000 (300,000) (300,000) (250,000) Total Combat aircraft 12,168,296 (250,000) 5,861,940 18,030,236 Budget Activity 03: Trainer aircraft Trainer Aircraft 14 Multi-Engine Training System (METS) A U Total Trainer aircraft UNCLASSIFIED Volume 3 - xx === page 23 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2025 Actuals Ident Code Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost Budget Activity 04: Other aircraft Other Aircraft 15 KC-130J A U 16 MQ-4 Triton A U 17 MQ-25 A U Less: Advance Procurement (PY) 2 294,406 4 159,226 (61,979) 1 145,000 5 123,839 3 663,017 123,839 (387,686) (100,000) 387,686 100,000 3 (487,686) (-11,979) 50,000 18 518,017 487,686 MQ-25 Advance Procurement (CY) C (FY 2026 for FY 2027) (M) 52,191 52,191 (52,191) (52,191) 15,162 15,162 C (FY 2027 for FY 2028) (M) 19 Marine Group 5 UAS 20 Other Support Aircraft A Total Other aircraft U 19,081 U 1 522,713 19,812 1,116,707 1 245,000 19,812 1,361,707 Budget Activity 05: Modification of aircraft UNCLASSIFIED Volume 3 - xxi === page 24 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Budget Activity 04: Other aircraft Other Aircraft 15 KC-130J A U 16 MQ-4 Triton A U 17 MQ-25 A U 11 7 1,190,000 18 104,326 3 Less: Advance Procurement (PY) 18 1,601,906 2,791,906 104,326 (823,368) 3 (823,368) (-52,191) (-52,191) 771,177 771,177 80,965 80,965 (80,965) (80,965) MQ-25 Advance Procurement (CY) C (FY 2026 for FY 2027) (M) C (FY 2027 for FY 2028) (M) 19 Marine Group 5 UAS 20 Other Support Aircraft A Total Other aircraft U 5 U 10 118,600 5 204,476 2,881,450 10 1,190,000 118,600 204,476 4,071,450 Budget Activity 05: Modification of aircraft UNCLASSIFIED Volume 3 - xxii === page 25 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2025 Actuals Ident Code Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost Modification of Aircraft 21 F-18 A-D Unique A U 80,301 53,809 53,809 22 F-18E/F and EA-18G Modernization and Sustainm A U 483,823 576,229 576,229 23 Marine Group 5 UAS Series A U 112,672 137,318 137,318 24 AEA Systems U 17,107 25,848 25,848 25 AV-8 Series A U 3,582 26 Infrared Search and Track (IRST) A U 146,876 175,351 175,351 27 Adversary A U 49,724 21,535 21,535 28 F-18 Series A U 637,867 756,967 756,967 29 H-53 Series A U 94,946 63,227 63,227 30 MH-60 Series A U 97,197 100,093 100,093 UNCLASSIFIED Volume 3 - xxiii === page 26 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Modification of Aircraft 21 F-18 A-D Unique A U 36,951 36,951 22 F-18E/F and EA-18G Modernization and Sustainm A U 563,832 563,832 23 Marine Group 5 UAS Series A U 179,603 179,603 24 AEA Systems U 37,125 37,125 25 AV-8 Series A U 26 Infrared Search and Track (IRST) A U 171,345 171,345 27 Adversary A U 24,732 24,732 28 F-18 Series A U 858,716 858,716 29 H-53 Series A U 91,903 91,903 30 MH-60 Series A U 236,555 236,555 UNCLASSIFIED Volume 3 - xxiv === page 27 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals Ident Code Sec Qty Cost Qty Cost Qty Cost FY 2026 Total Qty 31 H-1 Series A U 155,461 149,405 32 E-2 Series A U 134,974 132,700 132,700 33 Trainer A/C Series A U 12,415 12,151 12,151 34 C-130 Series A U 158,753 144,017 144,017 35 FEWSG A U 663 5 5 36 Cargo/Transport A/C Series A U 13,162 7,526 7,526 37 E-6 Series A U 126,727 163,737 163,737 38 Executive Helicopters Series A U 69,495 66,645 66,645 39 T-45 Series A U 148,967 173,433 173,433 40 Power Plant Changes A U 20,167 18,707 18,707 41 JPATS Series A U 24,157 21,330 21,330 UNCLASSIFIED 20,000 Cost 169,405 Volume 3 - xxv === page 28 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 31 H-1 Series A U 304,267 304,267 32 E-2 Series A U 96,428 96,428 33 Trainer A/C Series A U 12,359 12,359 34 C-130 Series A U 185,266 185,266 35 FEWSG A U 36 Cargo/Transport A/C Series A U 20,100 20,100 37 E-6 Series A U 270,832 270,832 38 Executive Helicopters Series A U 57,319 57,319 39 T-45 Series A U 191,139 191,139 40 Power Plant Changes A U 23,765 23,765 41 JPATS Series A U 28,059 28,059 UNCLASSIFIED Volume 3 - xxvi === page 29 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2025 Actuals Ident Code Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 42 Aviation Life Support Mods A U 3,964 43 Common ECM Equipment A U 49,354 88,553 88,553 44 Common Avionics Changes A U 139,072 161,376 161,376 45 Common Defensive Weapon System A U 10,687 8,926 8,926 46 ID Systems A U 7,020 3,011 3,011 47 P-8 Series U 302,875 316,632 316,632 48 MAGTF EW for Aviation A U 25,597 22,356 22,356 49 V-22 (Tilt/Rotor B U 264,954 314,145 50 Next Generation Jammer (NGJ) A U 444,761 428,686 428,686 51 F-35 STOVL Series A U 229,843 241,051 241,051 52 F-35 CV Series A U 154,235 140,280 140,280 53 QRC A U 26,957 24,893 24,893 ACFT) Osprey UNCLASSIFIED 160,000 474,145 Volume 3 - xxvii === page 30 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 42 Aviation Life Support Mods A U 43 Common ECM Equipment A U 365,990 365,990 44 Common Avionics Changes A U 246,728 246,728 45 Common Defensive Weapon System A U 11,028 11,028 46 ID Systems A U 3,199 3,199 47 P-8 Series U 381,014 381,014 48 MAGTF EW for Aviation A U 20,686 20,686 49 V-22 (Tilt/Rotor B U 641,715 641,715 50 Next Generation Jammer (NGJ) A U 458,658 458,658 51 F-35 STOVL Series A U 428,881 81,000 509,881 52 F-35 CV Series A U 135,612 81,000 216,612 53 QRC A U 27,686 ACFT) Osprey UNCLASSIFIED 27,686 Volume 3 - xxviii === page 31 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals Ident Code Sec Qty Cost Qty 54 MQ-4 Series A U 79,913 55 DON Other 3 (TTNT) A U -37 56 DON Other 4 (TTNT) A U -21 57 DON Other 6 (TTNT) A U -191 Total Modification of aircraft Cost Qty Cost 180,463 FY 2026 Total Qty Cost 180,463 4,328,019 4,730,405 180,000 4,910,405 2,125,592 2,782,627 2,782,627 2,125,592 2,782,627 2,782,627 572,690 584,561 584,561 Budget Activity 06: Aircraft spares and repair parts Aircraft Spares and Repair Parts 58 Spares and Repair Parts A U Total Aircraft spares and repair parts Budget Activity 07: Aircraft support equipment and facilities Aircraft Support Equip & Facilities 59 Common Ground Equipment A U UNCLASSIFIED Volume 3 - xxix === page 32 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec 54 MQ-4 Series A U 55 DON Other 3 (TTNT) A U 56 DON Other 4 (TTNT) A U 57 DON Other 6 (TTNT) A U Qty Total Modification of aircraft Cost FY 2027 Mandatory Request Qty Cost 157,849 FY 2027 Total Qty Cost 157,849 6,269,342 162,000 6,431,342 4,511,417 239,790 4,751,207 4,511,417 239,790 4,751,207 Budget Activity 06: Aircraft spares and repair parts Aircraft Spares and Repair Parts 58 Spares and Repair Parts A U Total Aircraft spares and repair parts Budget Activity 07: Aircraft support equipment and facilities Aircraft Support Equip & Facilities 59 Common Ground Equipment A U 666,140 UNCLASSIFIED 666,140 Volume 3 - xxx === page 33 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals Ident Code Sec Qty Cost Qty Cost Qty Cost FY 2026 Total Qty 44,000 Cost 60 Aircraft Industrial Facilities A U 105,634 112,513 156,513 61 War Consumables A U 43,604 45,153 45,153 62 Other Production Charges A U 73,307 70,770 70,770 63 Special Support Equipment A U 396,543 117,962 40,000 157,962 64 Cancelled Account Adjustments A U 477 Total Aircraft support equipment and facilities 1,192,255 930,959 84,000 1,014,959 Total Aircraft Procurement, Navy 15,914,495 17,239,853 509,000 17,748,853 UNCLASSIFIED Volume 3 - xxxi === page 34 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 60 Aircraft Industrial Facilities A U 113,513 113,513 61 War Consumables A U 56,577 56,577 62 Other Production Charges A U 61,970 61,970 63 Special Support Equipment A U 218,318 218,318 64 Cancelled Account Adjustments A U Total Aircraft support equipment and facilities 1,116,518 1,116,518 Total Aircraft Procurement, Navy 26,947,023 UNCLASSIFIED 7,453,730 34,400,753 Volume 3 - xxxii === page 35 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Master Line Item Table of Contents (by Appropriation then Line Number) Appropriation 1506N: Aircraft Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 1 01 01 0145 FA-18E/F................................................................................................................................................ Volume 1 - 1 2 01 01 0147 Joint Strike Fighter CV.........................................................................................................................Volume 1 - 11 3 01 01 0147 Joint Strike Fighter CV, Advance Procurement................................................................................... Volume 1 - 39 4 01 01 0152 JSF STOVL.......................................................................................................................................... Volume 1 - 47 5 01 01 0152 JSF STOVL, Advance Procurement.................................................................................................... Volume 1 - 63 6 01 01 0158 CH-53K (Heavy Lift).............................................................................................................................Volume 1 - 69 7 01 01 0158 CH-53K (Heavy Lift), Advance Procurement....................................................................................... Volume 1 - 85 8 01 01 0164 V-22 (Medium Lift)............................................................................................................................... Volume 1 - 99 9 01 01 0178 UH-1Y/AH-1Z..................................................................................................................................... Volume 1 - 117 10 01 01 0193 P-8A Poseidon................................................................................................................................... Volume 1 - 123 11 01 01 0195 E-2D AHE.......................................................................................................................................... Volume 1 - 137 12 01 01 0195 E-2D AHE, Advance Procurement.....................................................................................................Volume 1 - 151 UNCLASSIFIED Volume 3 - xxxiii === page 36 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1506N: Aircraft Procurement, Navy Line # BA BSA Line Item Number Line Item Title 14 03 01 Multi-Engine Training System (METS)...............................................................................................Volume 1 - 155 0343 Page Appropriation 1506N: Aircraft Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 15 04 01 0416 KC-130J............................................................................................................................................. Volume 1 - 163 16 04 01 0442 MQ-4 TRITON....................................................................................................................................Volume 1 - 179 17 04 01 0449 MQ-25................................................................................................................................................ Volume 1 - 189 18 04 01 0449 MQ-25, Advance Procurement.......................................................................................................... Volume 1 - 203 19 04 01 0452 Marine Group 5 UAS......................................................................................................................... Volume 1 - 207 20 04 01 0465 Other Support Aircraft........................................................................................................................ Volume 1 - 215 UNCLASSIFIED Volume 3 - xxxiv === page 37 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1506N: Aircraft Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 21 05 01 0502 F-18 A-D Unique....................................................................................................................................Volume 2 - 1 22 05 01 0505 F-18E/F and EA-18G Modernization and Sustainment....................................................................... Volume 2 - 19 23 05 01 0507 Marine Group 5 UAS Series................................................................................................................Volume 2 - 55 24 05 01 0513 AEA Systems....................................................................................................................................... Volume 2 - 81 25 05 01 0514 AV-8 Series.......................................................................................................................................... Volume 2 - 89 26 05 01 0515 Infrared Search and Track (IRST)....................................................................................................... Volume 2 - 97 27 05 01 0522 Adversary........................................................................................................................................... Volume 2 - 101 28 05 01 0525 F-18 Series........................................................................................................................................ Volume 2 - 139 29 05 01 0528 H-53 Series........................................................................................................................................ Volume 2 - 211 30 05 01 0530 MH-60 Series..................................................................................................................................... Volume 2 - 241 31 05 01 0532 H-1 Series.......................................................................................................................................... Volume 2 - 279 32 05 01 0544 E-2 Series.......................................................................................................................................... Volume 2 - 311 33 05 01 0549 Trainer Acft Series............................................................................................................................. Volume 2 - 353 34 05 01 0560 C-130 Series...................................................................................................................................... Volume 2 - 377 35 05 01 0561 Flt Elect Wrfr Supt Grp (FEWSG)......................................................................................................Volume 2 - 409 36 05 01 0562 Cargo/Transport Acft Series.............................................................................................................. Volume 2 - 415 UNCLASSIFIED Volume 3 - xxxv === page 38 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1506N: Aircraft Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 37 05 01 0564 E-6 Series.......................................................................................................................................... Volume 2 - 433 38 05 01 0566 Executive Helicopters Series............................................................................................................. Volume 2 - 487 39 05 01 0569 T-45 Series........................................................................................................................................ Volume 2 - 503 40 05 01 0570 Power Plant Changes........................................................................................................................ Volume 2 - 545 41 05 01 0571 JT Primary Acft Trnr Sys (JPATS).....................................................................................................Volume 2 - 551 42 05 01 0575 Aviation Life Support Mods................................................................................................................Volume 2 - 571 43 05 01 0576 Common ECM Equipment................................................................................................................. Volume 2 - 579 44 05 01 0577 Common Avionics Changes...............................................................................................................Volume 2 - 597 45 05 01 0581 Common Defensive Weapon System................................................................................................ Volume 2 - 637 46 05 01 0582 ID Sys................................................................................................................................................ Volume 2 - 645 47 05 01 0586 P-8 Series.......................................................................................................................................... Volume 2 - 653 48 05 01 0587 MAGTF EW for Aviation.................................................................................................................... Volume 2 - 669 49 05 01 0590 V-22 (Tilt/Rotor Acft) Osprey............................................................................................................. Volume 2 - 677 50 05 01 0591 Next Generation Jammer (NGJ)........................................................................................................ Volume 2 - 737 51 05 01 0592 F-35 STOVL Series........................................................................................................................... Volume 2 - 745 52 05 01 0593 F-35 CV Series.................................................................................................................................. Volume 2 - 783 53 05 01 0595 QRC................................................................................................................................................... Volume 2 - 823 54 05 01 0596 MQ-4 Series....................................................................................................................................... Volume 2 - 825 UNCLASSIFIED Volume 3 - xxxvi === page 39 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1506N: Aircraft Procurement, Navy Line # BA BSA Line Item Number Line Item Title 58 06 01 Spares and Repair Parts....................................................................................................................... Volume 3 - 1 0605 Page Appropriation 1506N: Aircraft Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 59 07 01 0705 Common Ground Equipment............................................................................................................... Volume 3 - 15 60 07 01 0715 Aircraft Industrial Facilities................................................................................................................... Volume 3 - 59 61 07 01 0720 War Consumables................................................................................................................................Volume 3 - 67 62 07 01 0725 Other Production Charges................................................................................................................... Volume 3 - 79 63 07 01 0735 Special Support Equipment................................................................................................................. Volume 3 - 89 64 07 01 0790 Cancelled Account Adjustments.......................................................................................................... Volume 3 - 91 UNCLASSIFIED Volume 3 - xxxvii === page 40 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 3 - xxxviii === page 41 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Master Line Item Table of Contents (Alphabetically by Line Item Title) Line Item Title Line Item Number Line # BA BSA Page AEA Systems 0513 24 05 01..................... Volume 2 - 81 AV-8 Series 0514 25 05 01..................... Volume 2 - 89 Adversary 0522 27 05 01................... Volume 2 - 101 Aircraft Industrial Facilities 0715 60 07 01..................... Volume 3 - 59 Aviation Life Support Mods 0575 42 05 01................... Volume 2 - 571 C-130 Series 0560 34 05 01................... Volume 2 - 377 CH-53K (Heavy Lift) 0158 6 01 01..................... Volume 1 - 69 CH-53K (Heavy Lift), Advance Procurement 0158 7 01 01..................... Volume 1 - 85 Cancelled Account Adjustments 0790 64 07 01..................... Volume 3 - 91 Cargo/Transport Acft Series 0562 36 05 01................... Volume 2 - 415 Common Avionics Changes 0577 44 05 01................... Volume 2 - 597 Common Defensive Weapon System 0581 45 05 01................... Volume 2 - 637 Common ECM Equipment 0576 43 05 01................... Volume 2 - 579 Common Ground Equipment 0705 59 07 01..................... Volume 3 - 15 E-2 Series 0544 32 05 01................... Volume 2 - 311 E-2D AHE 0195 11 01 01................... Volume 1 - 137 E-2D AHE, Advance Procurement 0195 12 01 01................... Volume 1 - 151 UNCLASSIFIED Volume 3 - xxxix === page 42 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page E-6 Series 0564 37 05 01................... Volume 2 - 433 Executive Helicopters Series 0566 38 05 01................... Volume 2 - 487 F-18 A-D Unique 0502 21 05 01....................... Volume 2 - 1 F-18 Series 0525 28 05 01................... Volume 2 - 139 F-18E/F and EA-18G Modernization and Sustainment 0505 22 05 01..................... Volume 2 - 19 F-35 CV Series 0593 52 05 01................... Volume 2 - 783 F-35 STOVL Series 0592 51 05 01................... Volume 2 - 745 FA-18E/F 0145 1 01 01....................... Volume 1 - 1 Flt Elect Wrfr Supt Grp (FEWSG) 0561 35 05 01................... Volume 2 - 409 H-1 Series 0532 31 05 01................... Volume 2 - 279 H-53 Series 0528 29 05 01................... Volume 2 - 211 ID Sys 0582 46 05 01................... Volume 2 - 645 Infrared Search and Track (IRST) 0515 26 05 01..................... Volume 2 - 97 JSF STOVL 0152 4 01 01..................... Volume 1 - 47 JSF STOVL, Advance Procurement 0152 5 01 01..................... Volume 1 - 63 JT Primary Acft Trnr Sys (JPATS) 0571 41 05 01................... Volume 2 - 551 Joint Strike Fighter CV 0147 2 01 01..................... Volume 1 - 11 Joint Strike Fighter CV, Advance Procurement 0147 3 01 01..................... Volume 1 - 39 KC-130J 0416 15 04 01................... Volume 1 - 163 MAGTF EW for Aviation 0587 48 05 01................... Volume 2 - 669 UNCLASSIFIED Volume 3 - xl === page 43 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page MH-60 Series 0530 30 05 01................... Volume 2 - 241 MQ-25 0449 17 04 01................... Volume 1 - 189 MQ-25, Advance Procurement 0449 18 04 01................... Volume 1 - 203 MQ-4 Series 0596 54 05 01................... Volume 2 - 825 MQ-4 TRITON 0442 16 04 01................... Volume 1 - 179 Marine Group 5 UAS 0452 19 04 01................... Volume 1 - 207 Marine Group 5 UAS Series 0507 23 05 01..................... Volume 2 - 55 Multi-Engine Training System (METS) 0343 14 03 01................... Volume 1 - 155 Next Generation Jammer (NGJ) 0591 50 05 01................... Volume 2 - 737 Other Production Charges 0725 62 07 01..................... Volume 3 - 79 Other Support Aircraft 0465 20 04 01................... Volume 1 - 215 P-8 Series 0586 47 05 01................... Volume 2 - 653 P-8A Poseidon 0193 10 01 01................... Volume 1 - 123 Power Plant Changes 0570 40 05 01................... Volume 2 - 545 QRC 0595 53 05 01................... Volume 2 - 823 Spares and Repair Parts 0605 58 06 01....................... Volume 3 - 1 Special Support Equipment 0735 63 07 01..................... Volume 3 - 89 T-45 Series 0569 39 05 01................... Volume 2 - 503 Trainer Acft Series 0549 33 05 01................... Volume 2 - 353 UH-1Y/AH-1Z 0178 9 01 01................... Volume 1 - 117 UNCLASSIFIED Volume 3 - xli === page 44 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page V-22 (Medium Lift) 0164 8 01 01..................... Volume 1 - 99 V-22 (Tilt/Rotor Acft) Osprey 0590 49 05 01................... Volume 2 - 677 War Consumables 0720 61 07 01..................... Volume 3 - 67 UNCLASSIFIED Volume 3 - xlii === page 45 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (by Appropriation then Line Number) Appropriation 1506N: Aircraft Procurement, Navy Line # BA BSA Line Item Number Line Item Title 58 06 01 Spares and Repair Parts....................................................................................................................... Volume 3 - 1 0605 Page Appropriation 1506N: Aircraft Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 59 07 01 0705 Common Ground Equipment............................................................................................................... Volume 3 - 15 60 07 01 0715 Aircraft Industrial Facilities................................................................................................................... Volume 3 - 59 61 07 01 0720 War Consumables................................................................................................................................Volume 3 - 67 62 07 01 0725 Other Production Charges................................................................................................................... Volume 3 - 79 63 07 01 0735 Special Support Equipment................................................................................................................. Volume 3 - 89 64 07 01 0790 Cancelled Account Adjustments.......................................................................................................... Volume 3 - 91 UNCLASSIFIED Volume 3 - xliii === page 46 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 3 - xliv === page 47 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (Alphabetically by Line Item Title) Line Item Title Line Item Number Line # BA BSA Page Aircraft Industrial Facilities 0715 60 07 01..................... Volume 3 - 59 Cancelled Account Adjustments 0790 64 07 01..................... Volume 3 - 91 Common Ground Equipment 0705 59 07 01..................... Volume 3 - 15 Other Production Charges 0725 62 07 01..................... Volume 3 - 79 Spares and Repair Parts 0605 58 06 01....................... Volume 3 - 1 Special Support Equipment 0735 63 07 01..................... Volume 3 - 89 War Consumables 0720 61 07 01..................... Volume 3 - 67 UNCLASSIFIED Volume 3 - xlv === page 48 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 3 - xlvi === page 49 === Executive Summary for Aircraft Procurement, Navy Table 1: FundingOverview FY 2026 ($K) FY 2027 ($K) FY 2025 ($K) Discretionary $ 15,914,495 $ 17,239,853 $ 26,947,023 Mandatory $ 509,000 $ $ 7,453,730 $ 15,914,495 $ 17,748,853 $ 34,400,753 Total BLI 0147 0152 0416 0449 0532 0590 0592 0593 0605 0715 0735 Table 2: Funding Overview FY 2026 ($K) FY 2025 ($K) Reconciliation Bin Title $ Air Superiority $ Air Superiority $ Air Superiority 145,000 $ 100,000 Air Superiority Readiness $ 20,000 $ 160,000 Air Superiority $ Air Superiority $ Air Superiority $ Air Superiority $ 44,000 Munitions & Supply Chain $ 40,000 Air Superiority $ $ 509,000 Mandatory Total FY 2027 ($K) $ 3,926,560 $ 1,935,380 $ 1,190,000 $ $ $ $ 81,000 $ 81,000 $ 239,790 $ $ $ 7,453,730 Volume 3 - xlvii === page 50 === MANDATORY FUNDING JUSTIFICATION: The FY 2027 request for Aircraft Procurement, Navy includes $26,947,023 thousand of discretionary and $7,453,730 thousand of mandatory for a total of $34,400,753 thousand. The mandatory funds support: Joint Strike Fighter (JSF) Carrier Variant (CV): The mandatory funds provide for the procurement of 29 F-35Cs, non-recurring flyaway, and support efforts. JSF Short Takeoff and Vertical Landing (STOVL): The mandatory funds provide for the procurement of 10 F-35B, non-recurring flyaway, and support efforts. KC-130J: The mandatory funds provide for the procurement of seven KC-130J aircraft, non-recurring flyaway, and support efforts. F-35 STOVL Series: The mandatory funds provide Block 4 modification and retrofit products. F-35 CV Series: The mandatory funds provide for Correction of Deficiency and Block 4 modification and retrofit products. Spares and Repair Parts: The mandatory funds support critical procurement and sustainment for the F-35 program. The funding is essential for acquiring long-lead items, including initial engine spares, site activation hardware, and depot spares for Lot 20 aircraft. This investment continues to support Global Sustainment Support (GSS) Reset initiatives aimed at enhancing F-35 readiness by improving parts availability, reducing resupply times, and boosting maintenance efficiency. The FY 2026 spend plan for Aircraft Procurement, Navy includes $17,239,853 thousand of discretionary and $509,000 thousand of mandatory for a total of $17,748,853 thousand. Volume 3 - xlviii === page 51 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 06: Aircraft Spares and Repair Parts / BSA 0605 / Spares and Repair Parts 1: Aircraft Spares and Repair Parts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 0.000 0.000 0.000 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 2,125.592 2,125.592 2,125.592 2,782.627 2,782.627 2,782.627 4,511.417 - 0.000 4,511.417 - 4,511.417 - 0.000 4,511.417 - 4,511.417 0.000 4,511.417 4,136.354 4,136.354 4,136.354 4,680.172 4,680.172 4,680.172 4,197.233 To FY 2031 Complete 3,848.539 Continuing 4,197.233 - Continuing - 3,848.539 Continuing 4,197.233 Total - Continuing - - 3,848.539 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: All aviation spares requirements are developed using accredited sparing models. APN-6 is an "enabler" account that proactively supports the readiness and sustainment of Navy and Marine Corps aviation platforms by procuring all applicable spare and repair parts associated with end-items and modifications funded under APN Budget Activities (BA) 1-4 (aircraft), BA 5 (modification of aircraft), and BA 7 (aircraft support equipment and facilities). As an enabler account, APN-6 anticipates and aligns with program needs, installation schedules, basing strategies, and evolving maintenance data to ensure timely availability of critical components. The Initial spares category includes all repairable and consumable allowances required to support the quantity and Type/Model/Series (T/M/S) of aircraft and aircraft systems in new procurement. This includes support during Interim Contractor Support (ICS) for Repair of Repairables (ROR) prior to Material Support Date (MSD), as well as for aircraft modifications. Key platforms supported by initial spares include F-35, P-8A, MQ-25, CH-53K and KC-130J. Initial spares supporting aircraft procured under APN BA-1 through BA-4 are based on the number of aircraft being procured, basing plans, flying hours, maintenance data, and additional data elements derived from the Weapon System Planning Document and Aircraft Program Data File that are used as input parameters for the Readiness Based Sparing model and the Retail Inventory Model for Aviation for the determination of spare engine requirements. Spare engines and engine modules are procured under Initial spares during the production of the aircraft and do not transition to the Navy Working Capital Fund (NWCF). The Initial spares category funds Repair of Repairables (ROR) (9401) via contractor support, prior to the MSD, at which time repairs are turned over to the organic depots. Spares for Modification (9504) follow the APN BA-5 modification budget for all T/M/S supporting various Engineering Change Proposals (ECPs) and Operational Safety Improvement Program (OSIP) initiatives. Spares for Aircraft Support Equipment and Facilities follow the APN BA-7 budget for all T/M/S providing spares for training devices and support equipment (0720 and 9705-9709). Wholesale Supply Inventory (0930) includes spare parts that support long-term maintenance of weapon systems after they reach their Material Support Date (MSD). These spares help ensure system readiness and protect the financial health of the Navy Working Capital Fund (NWCF). They go beyond initial stock levels and include: Lay-In Spares - Purchased by the Program Office to build initial wholesale inventory, then transferred to NAVSUP WSS (WSS) for ongoing sustainment at MSD. LI 0605 - Spares and Repair Parts Navy UNCLASSIFIED Page 1 of 14 P-1 Line #58 Volume 3 - 1 === page 52 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 06: Aircraft Spares and Repair Parts / BSA 0605 / Spares and Repair Parts 1: Aircraft Spares and Repair Parts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Density Increase Spares - Added to support growing number of systems, to help WSS prepare for increased demand. Reliability Spares - Used to replace parts that fail more often as systems age or become obsolete due to issues like Diminishing Manufacturing Sources and Material Shortages (DMSMS). Replenishment spares are composed of two distinct groups of spares: Headquarters Replenishment and Outfitting spares. NAVAIR procures and manages the inventory of Headquarters Replenishment spares with APN-6 funding while WSS procures and manages the inventory of Outfitting spares with NWCF. Headquarters Replenishment spares procure shipping containers (9710), T-38 Test Pilot School (TPS) Spares (9711) and various programs (9712) such as E-6B, manned recon programs and designated cargo/ passenger transportation aircraft. Due to the nature of Adversary and Headquarters Replenishment programs, spares are procured with APN-6 for the life of the program and are not transferred to NWCF. The Outfitting Replenishment category funds the Aviation Outfitting Account for Repairables (AOA) (9713) and Aviation Outfitting Account for Consumables (ACA) (9714) for initial sparing allowances and range/ depth increases onboard operational CVNs and amphibious ships (LHA/D), Forward Deployed Naval Forces and Continental United States Naval Aviation Shore Commands, and Marine Aviation Logistics Squadrons. WSS uses NWCF as a short-term funding vehicle to order spare parts from vendors with multi-year lead times. It requires sufficient and stable APN-6 Outfitting funding to pay back the NWCF before sending the outfitting material to Fleet units. AOA/ACA fills Aviation and Shore Consolidated Allowances Lists (AVCALs/SHORCALs) and are integral in providing 90-day sustainment levels to maintain operational and wartime readiness for fielded systems such as F/A-18, H-1, E-2, V-22, P-8, H-60, MQ-4, and Common Avionics while deployed aboard air-capable ships plus aviation shore sites. AOA/ACA funding also supports improved aviation operational readiness across the Fleet by providing immediate-fill, point-of-use spare parts needed to fix aircraft in a down status and mitigate longer logistics response times. The FY 2027 request for Spares and Repair Part includes $4,511,417 thousand of discretionary and $239,790 thousand of mandatory (reconciliation) for a total of $4,751,207 thousand. FY 2027 total funding supports critical procurement and sustainment for the F-35 program. The funding is essential for acquiring long-lead items, including initial engine spares, site activation hardware, and depot spares for Lot 20 aircraft. This investment continues to support Global Sustainment Support (GSS) Reset initiatives aimed at enhancing F-35 readiness by improving parts availability, reducing resupply times, and boosting maintenance efficiency. A key component of this strategy is maintaining the Navy and Marine Corps' share of the Global Spares Pool (GSP), a cost-sharing system with the Air Force and international partners that optimizes spare parts inventory and reduces costs for all participants. Ultimately, this funding is critical for improving Mission Capable rates and achieving sustainment goals across the entire fleet. LI 0605 - Spares and Repair Parts Navy UNCLASSIFIED Page 2 of 14 P-1 Line #58 Volume 3 - 2 === page 53 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 06: Aircraft Spares and Repair Parts / BSA 0605 / Spares and Repair Parts 1: Aircraft Spares and Repair Parts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-18 APN spares P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 2,125.592 - / 2,782.627 - / 4,511.417 / 0.000 - / 2,125.592 - / 2,782.627 - / 4,511.417 - / - - / 4,511.417 / 0.000 - / 4,511.417 Title represents the P-18 Title for Spares. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Aviation sparing is a critical enabler of naval power projection. It directly supports the Chief of Naval Operations (CNO) and the Commandant of the Marine Corps (CMC) in building and sustaining a credible combat force capable of keeping sea lanes open, deterring conflict, and winning wars. By delivering initial plane-side spare and repair parts per authorized allowance listings, aviation sparing ensures the operational readiness of naval aviation platforms for force generation and global deployment across key theaters like EUCOM and INDOPACOM. Without timely and sufficient aviation sparing, the Navy and Marine Corps (DoN) risk degraded readiness, delayed response times, and reduced combat effectiveness in contested environments. FY2027 funding levels prioritize immediate readiness needs across the fleet, ensuring sustained support for today's afloat deployers, shore stations, and expeditionary units. At the same time, this investment strategically supports the long-term sustainment of key aviation platforms and systems critical to the Airwing of the Future and the Aviation Combat Element (ACE). Due to multi-year supplier lead times, the DoN must invest in spares today to ensure future readiness and operational success. These strategic investments increase the range and depth of spares onboard CVNs and the ACE, directly improving deployed aviation readiness and supporting the CNO's 90-day endurance requirement for repair parts. Enhancing onboard spares also extends CVN and the ACE time on station without resupply, reducing the logistics burden in contested environments. Initial contractor spares, engine spares, and Peculiar Support Equipment (PSE) spares are major cost drivers as new T/M/S continue to be introduced, procured, and modified for technological improvements. Aviation spares support changes to basing plans and required support packages. More specifically, AVCAL/SHORCAL funding enables maximized employment for Carrier Air Wings/Marine Aircraft Group squadrons to train and deploy with minimal Non-Mission Capable, Supply (NMCS) impacts to readiness. The aviation spares budget further supports the Secretary of Defense's strategy to improve warfighting readiness by addressing urgent warfighting materiel readiness shortfalls. Initial Spares: FY2027 Initial spares funding includes required support of the following aircraft platforms: F/A-18 E/F (0145) FY2027 funding supports Consolidated Automated Support System (CASS) Operational Test Program Sets (OTPS) for the Infrared Search and Track (IRST) System. This funding supports EO4 emerging system requirements to support F/A-18E/F IRST AN/ASG-34 Block III Upgrade and hardware obsolescence of CASS/eCASS EO3 configuration. Joint Strike Fighter (JSF) Carrier Variant (CV) (F-35C) (0147) and Short Takeoff and Vertical Landing (STOVL) (F-35B) (0152) CV Funding increased from $202.029M (FY2026) to $520.056M (FY2027) (+$318.027M) The FY2027 request for Joint Strike Fighter (JSF) Carrier Variant (CV) (F-35C) USN includes $422.842 million of discretionary and $0 of mandatory (reconciliation) for a total of $422.842 million. LI 0605 - Spares and Repair Parts Navy UNCLASSIFIED Page 3 of 14 P-1 Line #58 Volume 3 - 3 === page 54 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 06: Aircraft Spares and Repair Parts / BSA 0605 / Spares and Repair Parts 1: Aircraft Spares and Repair Parts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A The FY2027 request for Joint Strike Fighter (JSF) Carrier Variant (CV) (F-35C) USMC includes $97.214 million discretionary and $85.066 million of mandatory (reconciliation) for a total of $182.280 million. The FY2027 request for Joint Strike Fighter (JSF) Short Takeoff and Vertical Landing (STOVL) (F-35B) includes $146.721 million of discretionary and $154.724 million of mandatory (reconciliation) for a total of $301.445 million. FY2027 funding, comprising both discretionary and mandatory allocations, supports critical procurement and sustainment for the F-35 program. The funding is essential for acquiring long-lead items, including initial engine spares, site activation hardware, and depot spares for Lot 20 aircraft. This investment continues to support Global Sustainment Support (GSS) Reset initiatives aimed at enhancing F-35 readiness by improving parts availability, reducing resupply times, and boosting maintenance efficiency. A key component of this strategy is maintaining the Navy and Marine Corps' share of the Global Spares Pool (GSP), a cost-sharing system with the Air Force and international partners that optimizes spare parts inventory and reduces costs for all participants. Ultimately, this funding is critical for improving Mission Capable rates and achieving sustainment goals across the entire fleet. CH-53K (0158) FY2027 funding continues to build the required range and depth of T408 engine spares and spare parts commensurate with the growing CH-53K inventory. FY2027 spare engine procurements are required to accommodate a higher demand signal as the CH-53K platform begins to deploy in FY2026 and the T408 Mean Engine Flight Hours Between Removal (MEFHBR) is predicted to decrease. The FY2027 funding will enable the program to remain on track to support deployed Fleet flight operations. V-22 (0164) FY2027 funding supports spares MV-22 related procurements for Organizational Parts List (engine component) support on L-Class ships. P-8A (0193) Funding increased from $54.835M (FY2026) to $94.763M (FY2027) (+$39.928M) FY2027 funding supports Engine Spares procurement for the CFM56-7B27 Engine which includes the bare engine, and the engine build up kit that provides necessary parts for installation to the aircraft. Current engine inventory is short due to the FY2021 increase of the Program of Record (with 11 more aircraft in the inventory since the last spare model was run) and demonstrated time on wing of 6,000 hours compared to the projected time on wing of 10,000 hours based on commercial use and models. E-2D AHE (0195) Funding increased from $0.006M (FY2026) to $0.030M (FY2027) (+$0.024M) FY2027 funding supports PSE spares procurements in support of Radar Processing and Cooling System (RPCS) Live Sensor Feed, Vapor Cycle Test Stand (VCTS), and Onboard Oxygen Generator System (OBOGS) Air Cart. Joint Primary Aircraft Training System (JPATS) (0339) Funding increased from $10.860M (FY2026) to $13.479M (FY2027) (+$2.619M) FY2027 funding is critical to sustaining the JPATS T-6 fleet and supporting U.S. Navy and Marine Corps pilot training. It covers procurement of essential engine, propeller, wing, and flight critical weapons replacement assemblies (WRA's) necessary for T-6 mission capability. The JPATS Contractor Logistics Sparing (CLS) Model identified a need for 10 additional engines and more propellers due to 22 aircraft mishaps and major engine repairs from FY21-FY23 which have significantly increased repair demands. Without timely procurement, Naval Aviator production will be disrupted and negatively impact student pilot throughput. Advanced Helicopter Training System (AHTS) TH-73A (0344) Funding increased from $7.838M (FY2026) to $20.602M (FY2027) (+$12.764M) LI 0605 - Spares and Repair Parts Navy UNCLASSIFIED Page 4 of 14 P-1 Line #58 Volume 3 - 4 === page 55 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 06: Aircraft Spares and Repair Parts / BSA 0605 / Spares and Repair Parts 1: Aircraft Spares and Repair Parts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A FY2027 funding is critical to procure initial spare engines and dampers for the AHTS TH-73A fleet. The program includes 130 aircraft and requires 32 spare engines to maintain readiness for training. Severe weather events in late FY2024 and early FY2025 damaged key components, leading to unplanned removals and increased demand, especially of dampers. Combined with expected engine failures and long repair times, the lack of spares threatens training continuity. Without timely procurement, Naval Aviator production will be disrupted, negatively impacting U.S. Navy and Marine Corps rotary-wing readiness. KC-130J (0416) Funding increased from $24.251M (FY2026) to $86.180M (FY2027) (+$61.929M) FY2027 funding supports the procurement of initial spares necessary to sustain multiple pre-MSD components, address DMSMS requirements, and execute several modification efforts. These efforts include both production and cut-in deliveries. Supported items include AE2100D3 engines, Quick Engine Change Kits (QECK), propellers, In-Flight Refueling capabilities, communication suite upgrades, satellite & inertial navigation systems, and mission computer upgrades. MQ-25 (0449) Funding increased from $35.797M (FY2026) to $63.287M (FY2027) (+$27.490M) FY2027 will complete the range and depth for 2nd and 3rd MQ-25A deployments. Data maturity along with fact of life price increase for end items and raw material are contributors to cost increase. The MQ-25A spares are used to maintain safety and readiness in support of deployed CAG operations, fulfilling the organic CVN tanking role. Spares packages are tailored for each detachment to deploy with requisite spares in support of operational deployments. Increase between fiscal year requirements are commensurate with site (CVN/Shore) standup and deployment schedule tempo coupled with the resultant flight hour growth. VH-92A (0455) Funding increased from $0M (FY2026) to $5.034M (FY2027) (+$5.034M) FY2027 funding increase is critical for procurement of the CT7-8A6 engine spares for VH-92A. There is a single test cell intermediate level maintenance and depot level maintenance capability standup. Other Support Aircraft (0465) Funding increased from $3.409M (FY2026) to $16.584M (FY2027) (+$13.175M) FY2027 funding supports the procurement of initial spares necessary because of UC-12W aircraft procurement increase from one (1) in FY26 to ten (10) in FY27. These efforts include, but are not limited to, the Initial Sparing needed to support the increase in delivered aircraft. Supported items include PT6A-60A engines, propellers, starter generators, brakes, nose and main landing gear (NLG/MLG) and wheel assemblies, and tires. Spares for Repair of Repairables (ROR) (9401) Funding increased from $165.393M (FY2026) to $262.071M (FY2027) (+$96.678M) FY2027 funding provides repair of new parts for pre-MSD platforms and systems such as AH-1Z/UH-1Y, ALQ-99 LBC, CH-53K, C/MV-22, E-2D, E-6B, E/A-18G, F/A -18 A-D, F/A-18E/F, F/A-18E/F Infrared Search and Track (IRST), Intrepid Tiger, MH-60R/S, MQ-25, MQ- 4, MQ-9, Next Gen Jammer-Mid Band (NGJ-MB), P-8A and Aviation Support*. * Aviation Support consists of BRU-61, Consolidated Automated Support System (CASS), Common Avionics, Common Support Equipment (CSE) Avionics, & CSE Non-Avionics. Spares for Modifications (9504) Funding increased from $306.867M (FY2026) to $832.018M (FY2027) (+$525.151M) FY2027 funding supports modification and capability upgrades for platforms and systems such as AH-1Z/UH-1Y, ALQ-99 Low Band Consolidation (LBC), Aviation Support CVW*, CH-53K, C/MV-22, E-2D, E-6B, E/A-18G (+ MIDS/JTRS/TTNT), F/A-18A-D, F/A-18E/F (+ MIDS/JTRS/TTNT), F-5 (Adversary), KC-130J, Manned Recon, MH-60R/S, MQ-4C, MQ-9, Next Generation Jammer - Mid Band (NGJ-MB), P-8A, Project Beartrap and VH-92A. Funding increase for modification spares between FY2026 and FY2027 is essential to enhance operational readiness, mitigate critical safety risks, and modernize key warfighting capabilities across multiple platforms. The most significant increases are designated for the following vital procurements: LI 0605 - Spares and Repair Parts Navy UNCLASSIFIED Page 5 of 14 P-1 Line #58 Volume 3 - 5 === page 56 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 06: Aircraft Spares and Repair Parts / BSA 0605 / Spares and Repair Parts 1: Aircraft Spares and Repair Parts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A E/A-18G (+$244.0M): To enhance electronic attack capabilities and interoperability through the procurement of spares for: - Next Generation Electronic Attack (NGEAU): Modernizes the core electronic warfare suite. - Joint Tactical Terminal (JTT)-Global Lightning (GL): Improves tactical data reception and situational awareness. - Digital Video Mapping Computer-Upgrade (DVMC-U) - Brizo to include new requirement for APX-111 Combined Interrogator Transponder (CIT) Aviation Support CVW* (+$111.9M): To ensure fleet readiness, survivability, and extend the service life of critical assets: - Digital Interoperability (DI) Marine Air Ground Task Force (MAGTF) Agile Network Gateway Link (MANGL) (DI MANGL): Establishes essential supply support for this digital interoperability modification to ensure mission readiness. - Integrated Defense Electronic Countermeasures (IDECM) / Directional Infrared Countermeasure (DAIRCM): Procures upgraded electronic countermeasures kits (ALQ-214) and defensive systems (AAQ-45) to enhance aircraft survivability. - T-45 mitigation of urgent engine and physiological episode (PE) safety-of-flight risks and Service Life Extension Program spares addressing avionics obsolescence, ensuring fleet viability through 2035. F/A-18E/F (+$65.0M): To modernize the platform's electronic warfare and targeting systems by procuring spares for: - DVMC-U - JTT-GL - LITENING/Artemis FEU (FLIR Electronic Unit): upgrades the G4 pod to LITENING Digital Port (LDP) Pod and a brand-new ARTEMIS pod. - Advanced Electronic Warfare Suite (ADVEW): replaces the legacy ALR-67 Radar Warning Receiver and ALQ-214 onboard jammer systems with a single advanced electronic warfare suite. - Brizo to include new requirement for APX-111 CIT - Active Electronically Scanned Array (ASEA) AN-APG-65 and AN-APG-73 E-6B (+$25.0M): To ensure structural integrity, sustain mission readiness, and correct previous shortfalls in modernization spares for the aging E-6B fleet. This increase is designated for three primary efforts: - Structural Sustainment Service Life Extension Program (SLEP): Procures critical structural components (spar chords, leading-edge flaps) that were underestimated in the original SLEP budget. This is essential for addressing accelerated crack growth and corrosion, ensuring aircraft safety and availability. - Block II Modernization Spares: Corrects an underestimation for initial spares by funding key Block II components for shelf stock and reserve kits. This includes Family of Advanced Beyond Line-of-Sight Terminals (FAB-T)/Presidential and National Voice Conferencing (PNVC) battle station fiber optic/radio frequency (RF) cables and antenna power supply fans, which are vital for the upgraded communications suite. - Newly Added System Support (OSIP): Funds the procurement of spares for newly added requirements, including Advanced Data Link (ADL), KAPTON wiring replacements, auxiliary power unit (APU) exhaust boxes, and the Color Weather Radar system. MQ-9 (+$24.0M): To expand the platform's operational capabilities and supportability through spares for: - Maritime Domaine Awareness (MDA): Enhances maritime surveillance capabilities. - Detect and Avoid System (DAAS): Improves operational safety in diverse airspace. - Multifunctional Information Distribution System (MIDS) Joint Tactical Radio System (JTTRS) & Peculiar Support Equipment (PSE): Supports tactical data distribution and ensures adequate PSE is available. * Aviation Support CVW consists of Non-T/M/S specific trainers and training A/C. Spares Wholesale Supply Inventory (0930) Funding increased from $161.412M (FY2026) to $518.235M (FY2027) (+$356.823M) FY2027 funding supports shortfalls in Wholesale Inventory that support long-term maintenance of weapon systems after they reach their Material Support Date (MSD). The funding addresses shortfalls needed to restock operating units and support component repairs. It covers parts obsolescence across multiple platforms and fills gaps in wholesale spares inventory that were not initially included in the program office's provisioning plan. LI 0605 - Spares and Repair Parts Navy UNCLASSIFIED Page 6 of 14 P-1 Line #58 Volume 3 - 6 === page 57 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 06: Aircraft Spares and Repair Parts / BSA 0605 / Spares and Repair Parts 1: Aircraft Spares and Repair Parts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A JSF STOVL (F-35B), MQ-25 and P-8A experienced the most significant funding increases from FY2026 to FY2027: JSF (F-35B) from $0 to $209.6M, MQ-25 from $23.9M to $66.8M and P-8A from $17.5M to $89.2M. Spares for War Consumables (BRU-61) (0720) FY2027 funding supports contractor spares procurements for bomb rack requirements to support the expected fielding of the Small Diameter Bomb (SDB) II on F-35C resulting in higher usage for spares. BRU-61 B/A is a USAF-fielded bomb rack used by the USMC to support integration on F-35B/C and will be used as an interim solution for SDB II integration procurements of sufficient BRU-61C/A bomb racks. The BRU-61B/A is not suitable for long-term DON operational use. Procurement of BRU-61C/A is anticipated to begin in FY26, and delivering IOC quantities in 4QFY28. BRU-61B/A will be in use through FY2031. Spares for Training Devices (9705) Funding increased from $12.424M (FY2026) to $17.982M (FY2027) (+$5.558M) FY2027 funding supports the Operational Availability of training systems that provide training for all facets of Navy and Marine Corps Aviation mission from basic skills and tactics training to advanced skills and mission rehearsal training, for aircrew, operators and maintainers. Training Device Spares provides the material necessary to ensure the systems are Maintainable, supportable, and sustainable, as required by OPNAVINST 1551.11B (Policies and Procedures for Fielded Training Systems Support of Fielded Aviation Training Systems). Spares for Common Support Equipment (CSE) parts (9707) Funding increased from $0.776M (FY2026) to $2.875M (FY2027) (+$2.099M) FY2027 funding supports spare parts procurement for upgraded CSE systems critical to fleet maintenance. Identified through the Individual Spare Item List (ISIL), these spares prevent delays, extended repairs, and reduced availability of key assets. They include a 400 gallon Liquid Nitrogen (LIN) trailer, a 400 gallon Liquid Oxygen (LOX) trailer, Mobile Magnetic Particle Unit (MMPU) and Program Loader Set (PLS) ECP. Timely investment safeguards readiness and reduces strain on NWCF resources. Funding will also provide support for Integrated Maintenance Diagnostic System Test Set which is used to trouble shoot the aircraft Integrated Maintenance Diagnostic System and reduce maintenance manhours and repair costs. Spares for Consolidated Automated Support System (CASS) Spares (9708) Funding increased from $1.501M (FY2026) to $3.898M (FY2027) (+$2.397M) FY2027 funding supports spare parts procurement for the Electronic CASS (eCASS) which is used to test and maintain aircraft avionics. Obsolescence was managed during Full Rate Production 2 (FRP) 2, but new requirements from platforms like the F-35, E-2D, and unmanned aerial vehicles (UAVs) require a follow-on FRP 3. While the current Bill of Materials (BoM) is supportable through 2031, many components are no longer available in needed quantities. Lockheed Martin Rotary and Mission Systems and the Fleet Support Team (FST) are updating the BoM to enable continued production. FY2027 funding ensures readiness by supporting the new configuration with necessary spares. Spares for Tactical Combat Training System (TCTS) spares (9709) Funding increased from $3.625M (FY2026) to $7.755M (FY2027) (+$4.130M) FY2027 funding supports procurement of initial spares TCTS pods which are mounted to aircraft including the F/A-18, EA-18G, AH-1Z/UH-1Y, AV-8B, F-5, and F-16.These spares are required to maintain the TCTS pods operation which are being procured in FY2027 for NAS Lemoore, Oceana, and Virginia Capes (VACAPES), Key West, Pacific Missile Range Facility (PMRF) and West PAC training ranges. Replenishment: Spares for 6K (Cog) (9710) Funding increased from $61.249M (FY2026) to $61.450M (FY2027) (+$0.201M) FY2027 funding correlates to spares being procured for development of prototype containers for both FA-18 E/F and EA-18G Main and Nose landing gear (LG) assemblies. Due to size/cost of the Main/Nose LG assemblies and to prevent damage during shipping/handling. FY2027 funding supports sparing requirements that are prioritized in support of identified critical shipping container procurements. LI 0605 - Spares and Repair Parts Navy UNCLASSIFIED Page 7 of 14 P-1 Line #58 Volume 3 - 7 === page 58 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 06: Aircraft Spares and Repair Parts / BSA 0605 / Spares and Repair Parts 1: Aircraft Spares and Repair Parts ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Spares for T-38 Test Pilot School (TPS) (9711) Funding increased from $0.534M (FY2026) to $1.309M (FY2027) (+$0.775M) FY2027 funding increase supports procurement of replenishment spares via USAF Performance Based Logistics (PBL) contract in support of US Naval Test Pilot School. Cost increases due to T-38 structural modification through Talon Repair, Improvement and Modification programs and Wing Upgrade Program. These replenishment spares are required to improve safety, extend the life of the weapon system, and avoid negatively impacting student Test Pilot training. Spares for Headquarters (HQ) Replenishment (9712) Funding increased from $60.019M (FY2026) to $102.084M (FY2027) (+$42.065M) FY2027 funding supports replenishment spares for the VH-92A Executive Helicopter, Direct Support Squadron (DSS), E-6B, Project Beartrap, and Manned Reconnaissance programs. For the VH-92A, funding ensures readiness during scheduled maintenance and offsets rising spare part costs. It also supports the VH-3D and VH-60N executive helicopter sundown plan. DSS spares are critical for deployed operations in austere environments by preventing Aircraft on Ground situations. E-6B funding replenishes aging stock and supports Block II upgrades. Project Beartrap funding provides updated Anti-Submarine Warfare systems and support hardware. Manned Reconnaissance spares sustain readiness for Joint Chiefs of Staff tasking. Spares for Aviation Outfitting Account (AOA) Repairables (9713) Funding increased from $1,231.978M (FY2026) to $1,595.170M (FY2027) (+$363.192M) FY2027 funding supports the Department of Navy's sustainment of legacy aviation platforms including the F/A-18, AH-1Z, UH-1Y, E-2, MV-22, P-8, H-60, H-53, Common Avionics, and Special Projects by procuring critical initial spares through Aviation Outfitting. These spares fill AVCAL and SHORCAL requirements, aligned with the CNO and CMC readiness strategies. Funding also supports increased combat flying hours and expands material availability at OCONUS sites and air stations to ensure operational readiness, reduce repair delays, and sustain combat effectiveness. Spares for Aviation Outfitting Account (AOA) Consumables (9714) FY2027 funding supports improved aviation operational readiness across the Fleet, fulfillment of carrier and amphibious ships supply, air station allowance growth, and consumable parts. LI 0605 - Spares and Repair Parts Navy UNCLASSIFIED Page 8 of 14 P-1 Line #58 Volume 3 - 8 === page 59 === UNCLASSIFIED Date: April 2026 Exhibit P-18, Initial and Replenishment Spare and Repair Parts Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 06 / 1 End Item Line Item Number / Name [MDAP/MAIS] P-1 Line Item Number / Title: 0605 / Spares and Repair Parts Prior Years FY 2025 ($ M) Title: APN spares FY 2026 ($ M) FY 2027 Base ($ M) ($ M) FY 2027 OOC FY 2027 Total ($ M) ($ M) Initial BA 01 - Combat Aircraft 0145 / FA-18E/F - 0.788 1.651 1.479 - 1.479 0147 / Joint Strike Fighter CV - 114.910 202.029 520.056 - 520.056 0152 / JSF STOVL - 201.029 253.466 146.721 - 146.721 0158 / CH-53K (Heavy Lift) - 54.675 79.354 41.284 - 41.284 0164 / V-22 (Medium Lift) - 0.016 6.850 0.765 - 0.765 0193 / P-8A Poseidon - - 54.835 94.763 - 94.763 0195 / E-2D AHE - - 0.006 0.030 - 0.030 0339 / JT Primary Acft Trnr Sys (JPATS) - - 10.860 13.479 - 13.479 0343 / Multi-Engine Training System (METS) - 41.020 - 0.000 - 0.000 0344 / Advanced Helicopter Training System - 14.911 7.838 20.602 - 20.602 0416 / KC-130J - 4.699 24.251 86.180 - 86.180 0442 / MQ-4 TRITON - 3.072 - 0.000 - 0.000 0449 / MQ-25 - 57.106 35.797 63.287 - 63.287 0452 / Marine Group 5 UAS - 39.379 - 0.000 - 0.000 0455 / VH-92A Executive Helo - - - 5.034 - 5.034 0465 / Other Support Aircraft - - 3.409 16.584 - 16.584 9401 / Spares for Repair of Repairables - 15.699 165.393 262.071 - 262.071 - 310.636 306.867 832.018 - 832.018 - 63.688 161.412 518.235 - 518.235 BA 03 - Trainer Aircraft BA 04 - Other Aircraft BA 05 - Modification of Aircraft 9504 / Spares for Modifications BA 06 - Aircraft Spares and Repair Parts 0930 / Wholesale Supply Inventory BA 07 - Aircraft Support Equip & Facilities 0720 / War Consumables - 2.389 2.491 2.446 - 2.446 9705 / Spares for Training Devices - 17.827 12.424 17.982 - 17.982 9707 / Spares for CSE Parts - 1.335 0.776 2.875 - 2.875 9708 / Spares for CASS Spares - 1.442 1.501 3.898 - 3.898 9709 / Spares for TCTS Spares - 3.664 3.625 7.755 - 7.755 - 948.285 1,334.835 2,657.544 - 2,657.544 Subtotal: Initial LI 0605 - Spares and Repair Parts Navy UNCLASSIFIED Page 9 of 14 P-1 Line #58 Volume 3 - 9 === page 60 === UNCLASSIFIED Date: April 2026 Exhibit P-18, Initial and Replenishment Spare and Repair Parts Justification: PB 2027 Navy P-1 Line Item Number / Title: 0605 / Spares and Repair Parts Appropriation / Budget Activity / Budget Sub Activity: 1506N / 06 / 1 End Item Line Item Number / Name [MDAP/MAIS] Prior Years FY 2025 ($ M) Title: APN spares FY 2026 ($ M) FY 2027 Base ($ M) ($ M) FY 2027 OOC FY 2027 Total ($ M) ($ M) Replenishment BA 07 - Aircraft Support Equip & Facilities 9710 / Spares for 6K Cog - 22.116 9711 / Spares for Adversary - 0.368 9712 / Spares for HQ Replenishment - 66.380 9713 / Spares for AOA Repairables - 1,022.372 9714 / Spares for AOA Consumables - 66.071 Subtotal: Replenishment - Total Cost (Initial + Replenishment) Remarks: FY2027 INITIAL/REPLENISHMENT SPARES BREAKDOWN ($M): $4,511.417 - 61.249 61.450 - 61.450 0.534 1.309 - 1.309 60.019 102.084 - 102.084 1,231.978 1,595.170 - 1,595.170 94.012 93.860 - 93.860 1,177.307 1,447.792 1,853.873 - 1,853.873 2,125.592 2,782.627 4,511.417 - 4,511.417 FY2027 INITIAL SPARES BREAKDOWN ($M): FA-18 E/F (J0145): $1.479 PSE Spares: $1.479 JSF F-35C CV (J0147): $520.056 Contractor Spares: $456.874 Engine Spares: $61.829 PSE Spares: $1.353 The FY 2027 request for Joint Strike Fighter (JSF) Carrier Variant (CV) (F-35C) USN includes $422.842 million of discretionary and $0 of mandatory (reconciliation) for a total of $422.842 million. The FY2027 request for Joint Strike Fighter (JSF) Carrier Variant (CV) (F-35C) USMC includes $97.214 million discretionary and $85.066 million of mandatory (reconciliation) for a total of $182.280 million. JSF F-35B STOVL (J0152): $146.721 Contractor Spares: $114.784 Engine Spares: $30.282 PSE Spares: $1.655 CH-53K (Heavy Lift) (J0158): $41.284 Contractor Spares: $0.00 Engine Spares: $41.284 V-22 (Medium Lift) (J0164): $0.765 CMV-22 Engine Spares: $0.000 MV-22 Engine Spares: $0.765 LI 0605 - Spares and Repair Parts Navy UNCLASSIFIED Page 10 of 14 P-1 Line #58 Volume 3 - 10 === page 61 === UNCLASSIFIED Date: April 2026 Exhibit P-18, Initial and Replenishment Spare and Repair Parts Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 06 / 1 P-1 Line Item Number / Title: 0605 / Spares and Repair Parts Title: APN spares P-8A Poseidon (J0193): $94.763 Engine Spares: $94.763 E-2 AHE (J0195): $0.030 PSE Spares: $0.030 JT Primary Aircraft Trainer (JPATS) (J0339): $13.479 Contractor Spares: $1.506 Engine Spares: $11.973 Advanced Helicopter Training System (AHTS) (J0344): $20.602 Contractor Spares: $0.00 Engine Spares: $20.602 KC-130J (J0416): $86.180 Contractor Spares: $74.898 Engine Spares: $11.282 MQ-25 STINGRAY (J0449): $63.287 Contractor Spares: $26.440 Engine Spares: $36.230 PSE Spares: $0.617 VH-92A Executive Helo (J0455): $5.034 Engine Spares: $5.034 Other Support Aircraft (0465): $16.584 Contractor Spares: $16.584 FY2027 SPARES FOR REPAIR OF REPAIRABLES (ROR) (J9401): $262.071 AH-1Z/UH-1Y: $0.266 ALQ-99: $3.619 Assault DAIRCM AAQ-45:$0.762 Aviation Support: $39.349 CMV-22: $0.033 E-2D: $0.071 E/A-18G: $13.441 F/A-18 A/D: $0.671 F/A-18 E/F: $33.358 MH-60R: $0.960 MH-60S: $0.640 MQ-4C: $1.070 MQ-9: $91.499 MQ-25: $41.810 LI 0605 - Spares and Repair Parts Navy UNCLASSIFIED Page 11 of 14 P-1 Line #58 Volume 3 - 11 === page 62 === UNCLASSIFIED Date: April 2026 Exhibit P-18, Initial and Replenishment Spare and Repair Parts Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 06 / 1 MV-22B: $0.271 Next Generation Jammer Mid-Band: $17.488 P-8A: $16.763 ------------------------------------------------------- P-1 Line Item Number / Title: 0605 / Spares and Repair Parts Title: APN spares FY2027 SPARES FOR MODIFICATION (J9504): $832.018 AH-1Z/UH-1Y: $25.022 ALQ-99 LBC: $6.239 AVIATION SUPPORT CVW: $156.911 C-130: $0.270 CH-53K: $20.869 CMV-22: $5.536 E-2D: $17.249 E-6B: $41.554 EA-18G: $264.723 EA-18G MIDS/JTRS/TTNT: $0.731 F/A-18 A-D: $0.057 F/A-18 E/F: $93.732 F/A-18E/F MIDS/JTRS/TTNT: $5.150 F-5 (Adversary): $1.342 KC-130J: $0.113 Manned Recon: $7.878 Marine Group 5 UAS (MQ-9): $92.310 MH-60R: $14.937 MH-60S: $20.699 MV-22: $35.713 Next Generation Jammer - Mid Band: $4.895 P-8A: $7.690 Project Beartrap: $0.380 VH-92A: $8.018 ------------------------------------------------------FY2027 Spares for Wholesale Supply Inventory Spares (J0930) ($M): $518.235 CMV-22 Lay-In/DMSMS: $0.146 Common Support Equipment (SE) Lay-In: $0.163 E-2D DMSMS: $24.984 E-2D MIDS/JTRS/TTNT Lay In: $1.952 E/A-18G DMSMS: $15.831 NGJ DMSMS: $0.405 F/A-18 E/F Lay-In/DMSMS: $13.589 F/A-18 E/F IRST Lay-In/DMSMS: $71.911 F-405 LOTB DMSMS: $7.156 H-1 Lay-In/DMSMS: $0.755 JSF CV (F-35C) INV AUG/Lay-In/DMSMS: $10.456 JSF STOVL (F-35B) GSS Inv Aug: $209.559 LI 0605 - Spares and Repair Parts Navy UNCLASSIFIED Page 12 of 14 P-1 Line #58 Volume 3 - 12 === page 63 === UNCLASSIFIED Date: April 2026 Exhibit P-18, Initial and Replenishment Spare and Repair Parts Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 06 / 1 P-8 Series Lay-In/DMSMS: $89.195 MQ-4C DMSMS: $1.847 MQ-25 Lay-In/DMSMS: $66.784 MV-22 Lay-In/DMSMS: $3.502 ------------------------------------------------------- P-1 Line Item Number / Title: 0605 / Spares and Repair Parts Title: APN spares FY2027 War Consumables (BRU-61) (J0720): $2.446 Contractor Spares: $2.446 FY2027 SPARES FOR TRAINING DEVICES (J9705): $17.982 JSF Initial Spares $1.023 Initial Spares: $16.959 FY2027 Spares for CSE Parts (J9707): $2.875 FY2027 Spares for CASS Spares (J9708): $3.898 FY2027 Spares for TCTS Spares (J9709): $7.755 ------------------------------------------------------FY2027 REPLENISHMENT SPARES BREAKDOWN ($M): FY2027 Spares for 6K Cog (J9710): $61.450 FY2027 Spares for Adversary (J9711): $1.309 FY2027 SPARES FOR HQ REPLENISHMENT (J9712): $102.084 Direct Support Squadron: $7.733 E-6B: $12.153 Executive Helicopter Series: $3.025 Manned Reconnaissance Systems: $8.025 Project Bear Trap: $2.456 VH-92A Executive Helicopter: $68.692 AVIATION OUTFITTING ACCOUNTS (AOA): FY2027 SPARES FOR AOA REPAIRABLES (J9713): $1,595.170 AH-1Z/UH-1Y: $5.134 AVCAL WHOLENESS: $104.758 AVIATION SUPPORT CVW: $723.432 CH-53E: $2.226 LI 0605 - Spares and Repair Parts Navy UNCLASSIFIED Page 13 of 14 P-1 Line #58 Volume 3 - 13 === page 64 === UNCLASSIFIED Date: April 2026 Exhibit P-18, Initial and Replenishment Spare and Repair Parts Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 06 / 1 CH-53K: $308.506 CMV-22: $76.735 E-2D: $25.125 E/A-18G: $14.342 F/A-18 A-D: $1.036 F/A-18 E/F: $26.662 F/A-18 E/F IRST: $12.448 KC-130J: $6.467 KC-130T: $6.658 MH-60R: $21.952 MH-60S: $0.014 MQ-4C: $54.887 MV-22B: $6.547 Next Generation Jammer-Mid-Band (NGJ-MB): $168.896 P-3C: $0.055 P-8A: $26.290 ------------------------------------------------------- P-1 Line Item Number / Title: 0605 / Spares and Repair Parts Title: APN spares FY2027 SPARES FOR AOA CONSUMABLES (ACA) (J9714): $93.860 AH-1Z/UH-1Y: $3.744 AVCAL WHOLENESS: $3.376 CH-53E: $0.542 CH-53K: $6.741 CMV-22: $8.077 COMMON AVIONICS: $9.355 E/A-18G: $2.507 E-2C/D: $11.281 F/A-18 A-D: $0.363 F/A-18 E/F: $10.864 KC-130J: $6.239 KC-130T: $0.264 MH-60R: $7.116 MH-60S: $0.003 MQ-4C: $4.473 MV-22: $6.693 P-8A: $9.759 SUPPORT EQUIPMENT: $2.463 LI 0605 - Spares and Repair Parts Navy UNCLASSIFIED Page 14 of 14 P-1 Line #58 Volume 3 - 14 === page 65 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 07: Aircraft Support Equip & Facilities / BSA 0705 / Common Ground Equipment 1: Aircraft Support Equip & Facilities ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 6,206.809 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 6,206.809 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 6,206.809 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 572.690 572.690 572.690 584.561 584.561 584.561 666.140 - 0.000 - 666.140 - 0.000 - 666.140 0.000 666.140 666.140 666.140 573.140 573.140 573.140 557.223 557.223 557.223 570.272 570.272 570.272 To FY 2031 Complete 578.186 Continuing 578.186 578.186 Total - Continuing Continuing Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Common Ground Equipment line funds procurement of Automatic Test Equipment (ATE), various aircraft systems trainers and training aids, the Consolidated Automated Support System Family of Testers (CASS FOT), support equipment for the Rapid Deployment Force, mobile maintenance facilities for Marine expeditionary forces, and other aircraft ground support equipment that is either peculiar to out-ofproduction aircraft or common in applicability to more than one aircraft. The requiring managers responsible for these procurements and the funds presently assigned to them are as follows: Ground Support Equipment, Mobile Maint Facilities, General Skills Training, Topscene, and Other Flight Training. [P40A / AUTOMATIC TEST EQUIPMENT]: This sub-line provides for the transition of current Automated Test Equipment (ATE) Test Program Sets (TPSs) to AN/USM-636 Consolidated Automated Support System (CASS), AN/USM-702 Reconfigurable Transportable CASS (RTCASS), AN/USM-737 electronic CASS (eCASS), and Joint Services Electronic Combat System Tester (JSECST) USM-670A, the acquisition/ modification of associated test routines of common ATE to meet operational requirements identified in the Fleet-concurred Common Support Equipment Operational List and the acquisition/ modification of associated ancillary assets for CASS/RTCASS/eCASS to extend testing capability to meet these requirements. In addition, includes modifications to existing legacy ATE systems as required to support plans to fully transition TPSs to current ATE systems. TEST PROGRAM SETS (TPSs) TRANSITION TO CASS, RECONFIGURABLE TRANSPORTABLE CASS (RTCASS) AND eCASS: TPSs are support equipment consisting of hardware, software and documentation required to automatically fault isolate defective weapon system components and qualify them Ready-For-Issue (RFI). The budget requests funds for the procurement of TPSs to offload support from existing legacy ATE to CASS, RTCASS and eCASS as well as support of GFE requirements and CASS Family of Testers (FOT) stations at designated test integration facilities. COMMON ATE ACQUISITION, MODIFICATION AND TEST ROUTINES: System acquisition and modification is necessary to replace obsolete and unsupportable equipment, support current technology, incorporate necessary reliability and maintainability improvements and correct Fleet-reported problems as a result of engineering investigations/Quality Deficiency Reports. Without these modifications, replacement parts will not be available and common ATE will not remain operational. ASSOCIATED ANCILLARY ASSETS: CASS Family Ancillary assets extend the capabilities of CASS, RTCASS and eCASS to meet Unit Under Test (UUT) testing requirements where it is not feasible to upgrade the entire inventory of CASS Family testers. The budget requests funds for the acquisition and modification of these CASS ancillary assets. Without these modifications, these assets and the associated UUTs they support will not remain operational. LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 1 of 43 P-1 Line #59 Volume 3 - 15 === page 66 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 07: Aircraft Support Equip & Facilities / BSA 0705 / Common Ground Equipment 1: Aircraft Support Equip & Facilities ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A - 2 / A/C COMMON SUPPORT EQUIPMENT]: This budget sub-line provides for the acquisition of Support Equipment (SE) end items under the inventory and technical management of NAVAIR. These SE end items are required for ground testing handling, and maintenance of aircraft and their systems. Examples of SE items acquired under this budget line item include aircraft propulsion test systems, mobile air conditioners and generators and aircraft handling equipment. Also included are common avionics support equipment (ASE) items which are too complex technically to be transitioned to the inventory control point for acquisition. The ASE included is managed by NAVAIR and supported through the Navy Inventory Control Point. [P40A - 3 / ICP/HEADQUARTERS MANAGED SUPPORT EQUIPMENT]: This budget sub-line funds the procurement of end items of out of production weapon systems and Common Support Equipment (CSE) Deficits under the budget, procurement and inventory control of NAVICP. CSE end items are normally introduced into the fleet through NAVAIR development and initial procurement. When design stabilized and procurement packages are available, these items migrate to NAVICP management and are funded under this sub-line. NAVICP currently manages over 11,000 individual repairable support equipment end items. Additionally, this sub-line funds Replacement of CSE that is not logistically cost effective to continue use and requires replacement, and modification of existing CSE to extend service life. [P40A - 4 / PECULIAR SUPPORT EQUIPMENT (PSE)]: This budget sub-line funds the procurement of Peculiar Support Equipment (PSE) for out of production aircraft under the budget, procurement and inventory control of NAVAIR. Replacement of out-of-production aircraft in-use PSE items that are now marginally effective, due to obsolescence, or unavailability of associated logistics support. Design and production of PSE items that were not funded during the production phase of the weapon system, and modifications to out-of-production aircraft PSE to extend its useful service life. The PSE will support Fleet squadrons and Intermediate Level of Maintenance at both afloat and shore sites. [P40A - 5 / CONSOLIDATED AUTOMATED SUPPORT SYSTEM]: The electronic Consolidated Automated Support System (eCASS) program is chartered to replace CASS MainFrame (MF) test stations in the Navy's inventory. CASS, RTCASS, and eCASS continue to replace 30+ different types of computer-based Automatic Test Equipment (ATE) with a single modern family of testers (FOT), which are cost effective COTS/NDI-based ATE systems designated as the Navy's Standard Family of ATE. There are four configurations of eCASS that will be fielded, which support the entire spectrum of electronics testing requirements from direct current to light: Hybrid [tests digital and analog], Radio Frequency (RF) [tests radars and electronic warfare systems], Electro-Optics (EO3) [tests FLIRs and LASERs], and High Power [high energy radar systems]. Reconfigurable Transportable Consolidated Automated Support System (RTCASS) [a man-transportable version of RF CASS] is currently used for USMC rotary/fixed wing aircraft maintenance. eCASS, with its advanced capability to support legacy and emerging platforms, and reduced logistics footprint, will replace the existing configurations of both CASS and CASS FOT obsolete systems. The CASS FOT supports intermediate and depot level repair of aircraft, ship, submarine and other weapon system electronics. The CASS FOT performs fault detection and diagnostic testing of almost 3,000 different "black boxes" and associated circuit cards from AH-1Z, AV-8B, C-2A, E-2C/D, EA-6B, EA-18G, F/A-18C/D/E/F, F-35B/C, H-53E, MH-60R/S, T-45, UH-1Y and V-22 aircraft, as well as several NAVSEA/SPAWAR weapon systems. CASS FOT replaces older, legacy ATE systems that have become obsolete (parts are no longer available) and too expensive to maintain. CASS FOT reduces afloat CVN ATE manning from 104 to 54 billets and reduces the size of the AVCAL (spare parts) from 30,000 to 3,500. CASS FOT also reduces technician Naval Enlisted Classifications (NECs) types, along with their training courses, from 32 to only five (5). Each CVN will deploy with 14 eCASS stations and each LHD/LHA will deploy with two (2) stations. CASS FOT is utilized at intermediate and depot level maintenance facilities afloat and ashore to include Marine Aviation Logistics Squadrons (MALS), and Navy Fleet Readiness Centers (FRCs). RTCASS supports USMC V-22, Infrared Search and Track (IRST), rotary wing aircraft, and fixed wing aircraft. Current and budget year requirements are needed for CASS FOT support of new and transitioning weapon systems. New Requirements: F/A-18E/F/G (multiple), F-35B/C (multiple), P-8 (multiple), E-2C/D (multiple), MIDS (multiple), V-22, IRST (F/A-18), ATFLIR (F/A-18), MH-60R/S (multiple systems), UH-1Y and AH-1Z, EGI (multiple aircraft). Transitioning Legacy Testers: 30 legacy automatic testers that support Navy and USMC tactical aircraft. In addition to production costs for the newest member of the CASS FOT (eCASS), program costs include: (1) incorporation of ECPs to permit systematic insertion of new technology to meet requirements of new weapon system avionics, (2) incorporation of test technologies required to offload Test Program Sets (TPSs) from legacy ATE, (3) efforts to ameliorate obsolescence and improve system reliability, maintainability and supportability, (4) rehosting existing TPSs to leverage increased capabilities of new software technology, (5) providing support of CASS FOT installations at fleet sites afloat and ashore, (6) maintaining items LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 2 of 43 P-1 Line #59 Volume 3 - 16 === page 67 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 07: Aircraft Support Equip & Facilities / BSA 0705 / Common Ground Equipment 1: Aircraft Support Equip & Facilities ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A contractually required to be provided to contractors as Government Furnished Equipment, (7) maintaining supporting equipment used at CASS FOT laboratory and testing facilities, and (8) providing ancillary equipment necessary for functionality of CASS FOT. The purpose of the Fourth-Generation Electro-Optics (EO4) program is to replace aging and obsolete third-generation electro-optic (EO3) consoles with a modernized variant. There are 65 existing ThirdGeneration Electro-Optics (EO3) systems located at both shore-based and afloat activities. The EO3 systems are hosted by the Consolidated Automated Support System (CASS/eCASS) family of test systems and are used to provide for maintenance, diagnosis, and repair of the H-60R/S Multi-spectral Targeting System (MTS) and the F/A-18C/D/E/F Advanced Targeting Forward Looking Infrared (ATFLIR) and Infrared Search and Track (IRST) weapon systems. The fielded EO3 systems are experiencing increased failure rates and reduced weapon system availability due to obsolescence issues. The EO4 program will replace the existing EO3 systems with a modernized next-generation electro-optics system that is designed and developed as either a new design or an Engineering Change Proposal (ECP) to the existing system, as determined by the competitive procurement process. The EO4 system will meet all existing weapons system requirements, as well as the anticipated emerging requirements of new or upgraded FLIR, IRST, laser and optical weapons systems. In addition to production costs, the EO4 program costs also include: (1) Incorporation of ECPs to permit systematic insertion of new technology to meet requirements of emerging electro-optic weapon system avionics. (2) Incorporation of test technologies required to support emerging Test Program Sets (TPSs). (3) Efforts to mitigate future obsolescence and improve system reliability, maintainability and supportability. (4) Migration of existing TPSs from EO3 to EO4 to leverage increased capabilities of new software and technology. (5) Providing support for EO4 installations at fleet sites afloat and ashore, (6) maintaining any contractually provided Government Furnished Equipment. [P40A - 6 / MOBILE MAINTENANCE FACILITIES]: The Mobile Facility (MF) Program provides the overarching management construct to ensure configuration management and life cycle logistics for the Fleet MF inventory. The program provides engineering design solutions, production efforts and life cycle logistics in support of Navy and Marine Corps logistics requirements. The primary component is the MF, a 20'x8'x8' tactical shelter that meets structural and dimensional requirements of the International Organization for Standardization (ISO), the American National Standards Institute (ANSI), and the American Society for Testing and Material (ASTM). Designed for a 20-year service life, MFs are heated and cooled by Environmental Control Units, which the program procures and logistically supports. In tactical environments, electrical power required to support MF complexes is provided by DOW standard generator sets. The Naval Air Systems Command (NAVAIR) acts as the Primary Inventory Control Activity (PICA) for multi-service procurement of NAVAIR MFs and related ancillary equipment. Investment in the MF Program ensures a fully deployable logistics capability that can be deployed in a building block fashion across the battlespace, whether at sea or on land, in support of aircraft maintenance and supply support operations. The Program of Record inventory objective is 2,878 MFs. This objective is based on the Marine Corps Table of Basic Allowance (TBA) and Weapon System Planning Documents (WSPD), which find their roots in the combatant commanders' operational plans supporting the National Defense Strategy. Current active inventory is 2,847 MFs. MFs are an Air Combat Element (ACE) Aviation Logistics (AVLOG) integration enabler, which make the Marine Air Ground Task Force (MAGTF) more responsive, agile, flexible and lethal via support and sustainment operations in austere expeditionary environments. This supports the Naval Air Enterprise (NAE) Strategic Plan, Tri-Service Maritime Strategy Advantage at Sea: Integrated All-Domain Naval Power, and the Concept for Expeditionary Advanced Base Operations. MFs provide scalable expeditionary aviation logistics support to the operational commander that can be rapidly deployed by all transportation modes to any location in the world. Operationally, MFs provide the Navy and Marine Corps with a quick response stand-alone expeditionary sea or land basing capability to meet worldwide operational commitments. Economically, MFs reduce the need for MILCON and allow for standardized worldwide transportability. Key Attributes: - Fully integrated expeditionary sea/land basing capability deployable via ship, airlift or truck. Operationally deployable aboard Transport-Aviation Logistics Support Ship (TAVB), Maritime Prepositioning Ships (MPS) and Expeditionary Sea Base (ESB) shipping. - Provides an effective, reliable and affordable self-contained aircraft maintenance expeditionary sea or land basing capability (avionics, airframes, et. al.) - Provides for supply support functions (work space, parts storage & parts transport) LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 3 of 43 P-1 Line #59 Volume 3 - 17 === page 68 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 07: Aircraft Support Equip & Facilities / BSA 0705 / Common Ground Equipment 1: Aircraft Support Equip & Facilities ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A [P40A - 7 / GENERAL SKILLS TRAINING]: General Skill Training provides for the procurement of aviation training systems, including training devices and associated courseware, which are not associated with a specific aircraft platform. Additionally, General Skill Training procures Career Training Continuum (CTC) Ready Relevant Learning (RRL) Maintenance Trainers. As required, includes modifications and updates to reflect changes in technology or operating environment. Major Programs: The 'A' School Program's function is to provide initial foundational and theoretical skills training to all Navy/Marine Corps Officer and Enlisted personnel. It provides training for 20 aviation ratings, supporting 196 Navy Enlisted Classifications (NEC), 96 USMC Military Occupational Specialties (MOS) and 17 USN/USMC Officer Designators/MOS's. Advance Skills Management System (ASM) is a software application designed to identify job task requirements, assist in determining proficiencies, document qualification/certifications, track completed technical training and aviation maintenance personnel progress across an individual's career within their respective Maintenance Personnel Readiness (MPR)/Marine Corp Training & Readiness (T&R) in support of the Naval Aviation Enterprise (NAE). The Air Traffic Control (ATC) program provides the necessary simulated training and learning opportunities for shore and sea based air traffic control operations to Navy and Marine Corp personnel. The Landing Signal Officer (LSO) Program provides realistic simulation for shipboard fixed-wing aircraft recovery for training, certification and proficiency at visual aircraft recoveries while at sea, through the use of an aircraft carrier landing area trainer. The Naval Aviation Survival Training Program (NASTP) provides mission critical survival training systems and systems support for Navy and Marine Corps Aircrew and selected DoW personnel. The Air Combat Training Continuum (ACTC) Program provides the framework for post-Fleet Replacement Squadron (FRS) tactical aircrew training. The mission of ACTC is to provide Fleet, Joint, and Allied Force Commanders with quality combat-ready Naval Aviators capable of effectively executing in all mission areas. The Air Combat Training System (ACTS) is a Training Management System (TMS) that operates in a secure environment, ashore, and afloat, to deliver training content to the aviator as well as track and report his/her progress through the ACTC curriculum. Common ASW (CASW) produces airborne ASW training systems for officer and enlisted Aircrew for all ASW platforms (including P-3, H-60, P-8 and Triton) teaching critical analysis skills using computer courseware, table top trainers and ONI analysis products. Career Training Continuum (CTC) is a subset of General Skills Training. CTC is responsible for the the Ready Relevant Learning (RRL) Maintenance Trainer and funds modernization of training curriculum to ensure that sailors receive the right, world class training, at the right time throughout their career as well as procures upgrades/modernization to maintenance trainers for both general skill training and naval aviation platforms. [P40A - 8 / TOPSCENE]: TOPSCENE is a mission planning requirement that provides realistic 3D mission rehearsal, training, and reusable visual terrain databases to the Navy Fleet, Fleet Marine Forces, major war fighting commands, and unified commanders. TOPSCENE/Tactical Terrain Visualization System (TTVS) includes a range of programs including mission rehearsal tools, part simulation, and target database production tools. TOPSCENE/TTVS provides time critical mission rehearsal visual database of sensitive target areas for effective preparation of the battlefield. TOPSCENE/TTVS is a standalone application that may also be integrated with mission planning systems (JMPS) and contributes to satisfying the mission rehearsal requirement in the JMPS Operational Requirements Document. [P40A - 9 / OTHER FLIGHT TRAINING]: Other Flight Training procures upgrades/modernization to operational trainers not driven by retrofit changes to aircraft driven by an Operational Safety and Improvement Program (OSIP) or forward-fit changes made during the production of the aircraft classified as an investment cost. Also, trainer procurements to replace obsolete/beyond capability of repair trainers if classified as an investment cost are included. The Headquarters, Marine Corps (HQMC) Federation will invest in modernization of USMC KC-130, H-1, CH-53, V-22, MQ-9, F/A-18C/D, AV-8B, Presidential Helicopters, Marine Air Ground Task Force (MAGTF) Integration, Aviation Command and Control, Close Air Support/Joint Terminal Attack Controller (CAS/JTAC), and common systems training devices as planned in the HQMC Aviation Plan (AVPLAN). The Aviation Distributed Virtual Training Environment (ADVTE) infrastructure, along with the Tactical Environment (TEn) software will be modernized for existing 2nd and 3rd Marine Air Wing (MAW) sites; while ADVTE capability will be procured and installed for the 1st MAW site. Live Virtual Constructive (LVC) requirements will establish persistent integrated training between Naval Forces (Navy and Marine Corps); Joint, Interagency, International, Multinational (JIIM) partners; AEGIS; Carrier Air Wing; Maritime; and Unmanned Aerial Systems (UAS) aircraft, equipment, platforms, systems, and their respective training assets by enabling an LVC capability with live aircraft on various Department of War range facilities. To facilitate LVC integration into the USMC training systems, Marine Virtual Warfare Center (MVWC), and Common Virtual Training Environment (CVAT) will be required. Training courseware and curriculums will be procured for transformational Marine Corps Aircraft. Marine Corps Aviation Learning Management System (MCALMS) provides courseware hosting of USMC courseware. The Navy Aviation Simulation Master Plan (NASMP) investments modernize F/A-18E/F, EA-18G, F-35, E-2, C-2, MH-60R&S, MH-53, P-3C, EP-3, P-8A, E-6B, MQ-4, MQ-25, adversary aircraft, and in the future CMV-22 and E-XX training systems. NASMP supports aircrew and maintainer training systems through obsolescence mitigation, fidelity improvements, Distributed Mission Training (DMT) network connectivity, and cybersecurity improvements. DMT includes deployable training systems on land and on Naval vessels. NASMP procures expanded high end fight integrated training capabilities for the Fleet at the Naval LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 4 of 43 P-1 Line #59 Volume 3 - 18 === page 69 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 07: Aircraft Support Equip & Facilities / BSA 0705 / Common Ground Equipment 1: Aircraft Support Equip & Facilities ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Aviation Warfighting Development Center (NAWDC) Fallon, NV, through the Integrated Training Facility (ITF) and Air Wing Training Facility (AWTF) and to include fidelity upgrades and integration of platform models (F-35, F/A-18, EA-18G, E-2D, and AEGIS) into the Joint Simulation Environment at these locations. NASMP Investments in improved Carrier Air Wing (CVW) DMT capability will create a secure Virtual - Constructive (VC) battlespace capable of meeting current and emerging highly complex threat training scenarios that deployed CVWs face. Link Inject to Live (LITL) provides constructive training information from ground-based stations to live aircraft. NASMP also invests in Chief of Naval Air Training (CNATRA) undergraduate flight training systems to address obsolescence and modernize in fixed wing, rotary wing and unmanned air vehicle operator (AVO) Ground Based Training Systems (GBTS). GBTS is used to generate production throughput and replacement of student Naval Aviators, Naval Flight Officers and AVOs needed to meet Fleet operational demand. LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 5 of 43 P-1 Line #59 Volume 3 - 19 === page 70 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 07: Aircraft Support Equip & Facilities / BSA 0705 / Common Ground Equipment 1: Aircraft Support Equip & Facilities ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a AUTOMATIC TEST EQUIPMENT P-40a A/C COMMON SUPPORT EQUIPMENT P-40a Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 566.649 - / 24.907 - / 25.645 - / 34.905 - / - - / 34.905 - / 650.084 - / 54.123 - / 64.882 - / 72.764 - / - - / 72.764 ICP/HEADQUARTERS MANAGED SUPPORT EQUIPMENT - / 301.457 - / 43.334 - / 13.811 - / 7.619 - / - - / 7.619 P-40a PECULIAR SUPPORT EQUIPMENT (PSE) - / 219.329 - / 33.929 - / 46.872 - / 30.071 - / - - / 30.071 P-40a CONSOLIDATED AUTOMATED SUPPORT SYSTEM P-5a, P-21 / 1,596.932 - / 94.885 - / 94.978 - / 91.077 - / - - / 91.077 P-40a MOBILE MAINTENANCE FACILITIES P-5a - / 178.626 - / 7.380 - / 7.588 - / 7.687 - / - - P-40a GENERAL SKILLS TRAINING P-5a - / 187.800 - / 11.487 - / 11.197 / 112.949 - / - P-40a TOPSCENE / - - / - P-40a OTHER FLIGHT TRAINING - / 2,495.309 - / 302.645 - / 319.588 - / 309.068 - / - - / 309.068 P-40 Total Gross/Weapon System Cost - / 6,206.809 - / 572.690 - / 584.561 - / 666.140 / 0.000 - / 666.140 P-5a, P-21 - - / 10.623 - / - - - / - - - / 7.687 - / 112.949 - / - *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: AUTOMATIC TEST EQUIPMENT: FY 2027 provides funding to offload multiple weapon system Operation Test Program Sets (OTPSs) to CASS, RTCASS, eCASS, and the Joint Services Electronic Combat Systems Tester (JSECST) from various legacy systems to include, Signal Generator Test Set (SGTS) an Electronic Warfare (EW) O-Level test system. Funding also for production of several High Speed Subsystem (HSS) ancillary assets. A/C COMMON SUPPORT EQUIPMENT: FY 2027 provides funding to procure CRAFT Replacement, Next Generation Software Loader Upgrade, Mobile Nitrogen Gas Generator, Particle Counters, AECTS Replacement/Modification, Engine Test Instrumentation Replacement System (ETIRS), First Destination Transportation Cost for hardware, TPS Migration, Engineering Change Proposals to address minor CSE performance and obsolescence issues as well as associated support cost. ICP/HEADQUARTERS MANAGED SUPPORT EQUIPMENT: FY 2027 provides funding for the procurement of end items of out of production weapon systems and Common Support Equipment (CSE) Deficits/Replacements under the budget, procurement and inventory control of Naval Inventory Control Point (NAVICP). PECULIAR SUPPORT EQUIPMENT: FY 2027 provides funding to procure PSE for the V-22, E-2C/D, F/A-18A-F/EA-18G and various out-of-production aircraft to fill Fleet site inventory deficits along with replacing PSE that has parts obsolescence issues and no longer cost effective to use. CONSOLIDATED AUTOMATED SUPPORT SYSTEM: FY 2027 provides funding to procure (5) eCASS Mid-Life UPGRADE (MLU), (12) Fourth-Generation Electro-Optics (EO4) and associated ancillary equipment. MOBILE MAINTENANCE FACILITIES: FY 2027 provides funding to procure (40) MFs and associated support costs. LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 6 of 43 P-1 Line #59 Volume 3 - 20 === page 71 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 07: Aircraft Support Equip & Facilities / BSA 0705 / Common Ground Equipment 1: Aircraft Support Equip & Facilities ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A GENERAL SKILLS TRAINING: ACTS - Expeditionary Laptop Upgrades: FY 2027 funding upgrades 25 Air Combat Training System (ACTS) expeditionary Laptops that provide a mobile ACTS training capability to deploying Aircrew. ATC - 15G34 Block Upgrades: FY 2027 funds block upgrade of the ATC 15G34TSS. The Device 15G34 Tower Simulation System (TSS) provides realistic training for Tower Air Traffic Controllers in a nonoperational environment. This upgrade/replacement is scheduled to address performance change requests submitted by Fleet users as well as hardware and/or software obsolesce issues. Total systems required: Thirty-eight (38). ATC - Electronic Training Management Tool: FY 2027 funds the development and delivery of an Electronic Training Jacket and Training Management System (web-based) to assess individual training requirements and readiness, manage Navy and Marine Corps formal, general military and technical training, qualification, certifications and licenses, and create short and long term training action plans for individuals. Total systems required: One (1). ATC - Learning Training Tool/Web based-self paced: FY 2027 funds the development and delivery of an interactive educational environment that will provide ATC training courses to the fleet. Additionally, the distribution and delivery of a self-paced and assessing training system used to teach basic and intermediate air traffic control concepts that will leverage existing technology to expand simulated training, focusing on the radar and tower portion of ATC services. Total systems required: Forty-two NASTP - 9H1 Helo Hoist Upgrades: FY 2027 upgrades one Helo Hoist/POST for FRCE and replaces corroded poolside platforms with a non-corrosive fiberglass reinforced polymer for improved structural integrity and safety. Final year of multi-year funded project. NASTP - Normobaric Hypoxia Chamber Regulator and Upgrade: FY 2027 funding upgrades will eliminate dependency on outside entities for NHT regulator test-and-check and maintenance. Common ASW - Interactive Multi-Sensors Analysis Trainer (IMAT) Upgrades: FY 2027 funding upgrades the Interactive Multi-Sensors Analysis Trainer (IMAT) trainer courseware to incorporate the latest learning technology and ASW threat analysis. Career Training Continuum (CTC) - Ready Relevant Learning (RRL) Maintenance Trainers: FY 2027 provides funding to procure and tech refresh multiple aviation maintenance trainers and training aids for general skills training and naval aviation platforms. The training devices have a mixture of aircraft parts and Commercial Off the Shel (COTS) hardware and software. Trainers and training aids will ensure maintainers are equipped with the skills and proficiency to keep air platforms mission capable and combat ready. OTHER FLIGHT TRAINING: HQMC Federation Programs: USMC training systems consists of 217 training Pilot, Aircrewman and Maintenance devices. The training devices have a mixture of aircraft parts and Commercial Off The Shelf (COTS) hardware and software. This budget programs in a 5-year cycle to tech refresh the COTS hardware and software. The distinct budget area for USMC training systems are broken out in the following descriptions. The Aviation Distributed Virtual Training Environ (ADVTE) Modernization is a System-of-Systems, delivers the vision of a persistent, relevant, high-fidelity virtual and constructive simulation-based training capability across 1st, 2nd, 3rd, and 4th Marine Air Wings (MAWs) while simultaneously providing capability to network and train with Joint partners. Inter-service Network Connectivity Modernization (TEn) is a part of every USMC training systems that connects to the ADVTE network. The Ten provides interoperability improvements and semi-automated forces (SAF) improvements within the ADVTE network and bridges to the NCTE environment. LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 7 of 43 P-1 Line #59 Volume 3 - 21 === page 72 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 07: Aircraft Support Equip & Facilities / BSA 0705 / Common Ground Equipment 1: Aircraft Support Equip & Facilities ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Marine Common Aircrew Trainer Aviation Maintenance Courseware is a series of maintenance courseware that provides a training curriculum supporting various skills set throughout the Marine maintainers' career. KC-130, H-1, MV-22, CH-53 & MQ-9 Training Systems use a combination of aircrew and maintenance training devices to create and refresh training and readiness skills to win the combat fight. The skills and frequency needed to maintain proficiency are listed in the Training and Readiness manual. This training equipment is a combination of aircraft and Commercial Off the Shelf (COTS) components that replicates the operational environment. The COTS hardware and software shelf life requires a 5-year tech refresh cycle to modernize the training systems to be reflective of the aircraft capabilities. FY 2027 contracts are for tech upgrades to replace Commercial Off the Shelf (COTS) hardware, cyber and windows operating systems. Navy Aviation Simulation Master Plan (NASMP) Programs: Common Simulation Models Delivery: FY 2027 procures annual deliveries to common simulation software and models used by Navy and USMC aviation trainers. Includes release of platform concurrent Next Generation Threat System (NGTS), Common Acoustic Simulation Environment (CASE), Common Visual Database and Common Weapon Models and Common Network Standards and Interfaces. Naval Aviation Distributed Training Center Atlantic (NADTC-L) and Naval Aviation Distributed Mission Training (NADMT): FY 2027 procures white cell capabilities and Distribute Mission Training (DMT) improvements for the naval aviation training components of the optimized fleet response plan. Link Inject to Live (LITL) capability provides L-16 training messages simulating constructive entities to support LVC/ DMT training scenarios. Carrier Air Wing (CVW) Distributed Mission Training (DMT): FY 2027 request continues a multi-year effort to enable CVW platform trainers to connect with one another to deliver secure, cross-T/M/S, integrated training. This enables aircrew across multiple locations to meet the National Defense Strategy priority to build a more lethal force by training to the high-end fight. Procures network upgrades to establish a secure Virtual-Constructive (VC) battlespace necessary to replicate near-peer threats and provide CVW training against advanced adversary systems that cannot be replicated or conducted live due to range and OPSEC limitations. This effort is for distributed mission training aviation simulators. It delivers DMT by ensuring electronic warfare/threat simulation is common across all mission participants, resolves simulator network discrepancies, and addresses platform trainer limitations that prevent repeatable distributed training capability, as well as implementing common voice communications upgrades, and realistic jamming effects. In anticipation of NAVFAC executed and MILCON funded facilities completion, NADMT will analyze requirements and procure training capabilities for Fleet Tactical Training Centers (FTTC) at NAS Lemoore, MCAS Iwakuni, NAS Whidbey Island, NAS Oceana, and deployed locations for high-end fight CVW training aids and devices. This program also supports USN integration into USAF sites at Edwards AFB, Nellis AFB, and Elmendorf AFB Additional efforts include procuring the SIMs at SEA (S@S) capability which started as a Technology Demonstration aboard the USS Abraham Lincoln and will transition to the program of record Deployable Advanced Training Environment (DATE) to provide an integrated training system that will include F-35, F/A-18E/F, EA-18G, and E-2D small footprint devices that will deploy aboard CVN's. DATE will also include the necessary efforts to provide spaces aboard the CVN at the appropriate classification levels. Integrated Training Facilities (ITF): FY 2027 procures software and hardware upgrades and integrates systems into the Integrated Simulation Environment (ISE). The ISE leverages the Joint Simulation Environment (JSE), and includes F-35, E-2D, F/A-18E/F, EA-18G and AEGIS training devices for high fidelity training. Integrated Training Facilities Fallon includes the Naval Air Warfare Development Center (NAWDC) Integrated Training Facilities, Air Wing Training Facility (AWTF). USN training systems consists of 988 training Pilot, Aircrewman and Maintenance training devices. The training devices have a mixture of aircraft parts and Commercial Off The Shelf (COTS) hardware and software. This budget programs in a 5-year cycle to tech refresh the COTS hardware and software. The distinct budget area for USN training systems are broken out in the following descriptions. MH-60R/S, FA/EA-18 , EA-18G, E-2D, E-6B, P-8A, MQ-4 & CNATRA Training Systems use a combination of aircrew and maintenance training devices to create and refresh training and readiness skills to win the combat fight. The skills and frequency needed to maintain proficiency are listed in the Training and Readiness manual. This training equipment is a combination of aircraft and Commercial Off the Shelf (COTS) components that replicates the operational environment. The COTS hardware and software shelf life requires a 5-year tech refresh cycle to modernize the training systems to be reflective of the aircraft capabilities. FY 2027 contracts are for tech upgrades to replace Commercial Off the Shelf (COTS) hardware, cyber and windows operating systems. The Pilot, NFO and Aircrew training devices conduct distributed training using the Navy Continuous Training Environment (NCTE) network capability. LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 8 of 43 P-1 Line #59 Volume 3 - 22 === page 73 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: AUTOMATIC TEST EQUIPMENT FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) Hardware 1.1) TPS Transition to A - - 398.008 - - 17.443 - - 19.063 - - 26.341 - - - - - 26.341 - - 398.008 - - 17.443 - - 19.063 - - 26.341 - - - - - 26.341 - - 15.259 - - 1.791 - - 1.583 - - 1.916 - - - - - 1.916 - - 15.259 - - 1.791 - - 1.583 - - 1.916 - - - - - 1.916 - - 42.094 - - 2.408 - - 1.917 - - 2.643 - - - - - 2.643 - - 42.094 - - 2.408 - - 1.917 - - 2.643 - - - - - 2.643 - - 111.288 - - 3.265 - - 3.082 - - 4.005 - - - - - 4.005 Subtotal: 4) Production Engineering - - 111.288 - - 3.265 - - 3.082 - - 4.005 - - - - - 4.005 Total - - 566.649 - - 24.907 - - 25.645 - - 34.905 - - - - - 34.905 CASS (1) Subtotal: 1) Hardware 2) Non-Recurring 2.1) TPS Transition to CASS A Subtotal: 2) Non-Recurring 3) ILS 3.1) TPS Transition to CASS A Subtotal: 3) ILS 4) Production Engineering 4.1) TPS Transition to CASS A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (1) FY27 increase reflects additional funding to support the CASS Family of Testers (FoT) Operational Test Program Set (OTPS) in support of the Radar Altimeter (RADALT) across all cost elements to include NRE, ILS, and Production Engineering. LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 9 of 43 P-1 Line #59 Volume 3 - 23 === page 74 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: A/C COMMON SUPPORT EQUIPMENT Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) Hardware 1.1) Vibration Vibration Analyzer A 1.2) COMM/NAV I/D - CRAFT Radio Test B (†) Set ECP 1.3) S/W Loader Next Generation Software Loader A 1.4) S/W Loader Next Generation Software Loader B 23,611.11 144 3.400 - - 689 26.349 - - - - - - 188,491.53 59 11.121 65,650.00 20 1.313 156,244.19 258 40.311 1,614K 13 85,566.67 - 38,242.38 - - - 150 2.500 - - 28,607.84 204 5.836 330,000.00 2 16,666.67 - - - - 241 4.097 - - 27,962.50 240 6.711 0.660 330,000.00 17,000.00 - - - - - - - 191 3.300 - - - - - - - - 28,521.25 165 4.706 - - - 12 3.960 330,000.00 10 3.300 - - - - - - - - 200 3.800 - - - 17,277.49 - - - - 191 3.300 - - 28,521.25 165 4.706 330,000.00 10 3.300 - - 200 3.800 17,277.49 - (†) Upgrade 1.5) Cryogenics Mobile Nitrogen Gas Generator (2)(†) 1.6) Cryogenics Shore 1000/2000 Gallon LOX/LIN Tanks B A - - - 188,578.95 19 3.583 - - 200 3.718 18,960.00 200 3.792 - - - - - - - - - - - - - - - 20.981 - - - - - - - - - - - - - - - 60 5.134 - - - - - - - - - - - - - - - 1,653K 12 19.831 - - - - - - - - - - - - - - - 76,720.00 375 28.770 81,200.00 100 8.120 - - - - - - - - - - - - 649,888.89 36 23.396 690,625.00 8 5.525 1,200K 9.600 1,200K 2 2.400 - - - 1,200K 2 2.400 - - - 3,762K 6 22.572 - - - 3,762K 6 22.572 (†) 1.7) Hydraulics Particle Counter (†) B 1.9) Platform Support - Air Conditioner Ship Shore A 1.11) Platform Support - CVN Class B Ship Crash Crane (†) 1.12) Platform Support - Diesel & Electric Servicing Platform A 1.13) Platform Support - L Class Ship B (†) Crash Crane 1.14) Electrical Medium Capacity MEPP B (†) 1.15) Electrical AECTS Replacement/ Modification B (†) 1.17) Propulsion - Engine Test Instrumentation B - LI 0705 - Common Ground Equipment Navy - - 18,590.00 - - 8 - UNCLASSIFIED Page 10 of 43 19,000.00 P-1 Line #59 19,000.00 Volume 3 - 24 === page 75 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] Replacement System (ETIRS) ID CD Code Unit Cost ($) Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) (3)(†) 1.18) First Destination Transportation Costs A 1.19) Engineering Change Proposal A (4) (ECP) MAIS FY 2025 Total Cost Aggregated Items Title: A/C COMMON SUPPORT EQUIPMENT (5) 1.20) Test Program Set Migration (TPS) (6) A Subtotal: 1) Hardware - - 4.589 - - 0.500 - - 0.500 - - 0.500 - - - - - 0.500 - - 2.790 - - 0.200 - - 0.200 - - 0.200 - - - - - 0.200 - - - - - - - - 3.820 - - 3.153 - - - - - 3.153 - - 187.985 - - 27.059 - - 36.263 - - 43.931 - - - - - 43.931 2) Non Recurring 2.1) Weapons Control A - - 5.742 - - - - - - - - - - - - - - - 2.2) Vibration A - - 3.306 - - - - - - - - - - - - - - - 2.6) COMM/NAV I/D A - - 6.992 - - - - - - - - - - - - - - - 2.7) Software Load A - - 9.609 - - - - - - - - - - - - - - - 2.8) Non Destruct Inspection (NDI) A - - 0.017 - - - - - - - - - - - - - - - 2.9) Cryogenics A - - 0.200 - - 2.255 - - - - - - - - - - - - 2.10) Hydraulics A - - 5.071 - - - - - - - - - - - - - - - A - - 2.782 - - - - - 3.200 - - 3.766 - - - - - 3.766 - - 23.922 - - - - - - - - - - - - - - - - - 12.521 - - - - - - - - - - - - - - - - - 0.859 - - - - - - - - - - - - - - - - - 71.021 - - 2.255 - - 3.200 - - 3.766 - - - - - 3.766 2.11) Propulsion (7) 2.12) Platform Support A 2.13) Electrical A 2.14) Electronic Warfare A Subtotal: 2) Non Recurring 3) ILS 3.1) Weapons Control A - - 3.928 - - 0.296 - - 0.277 - - 0.270 - - - - - 0.270 3.2) Vibration A - - 1.462 - - 0.105 - - 0.098 - - 0.095 - - - - - 0.095 3.3) Corrosion A - - 0.894 - - 0.048 - - 0.045 - - 0.044 - - - - - 0.044 3.4) Aircraft Wiring A - - 1.927 - - 0.146 - - 0.136 - - 0.132 - - - - - 0.132 3.5) Shipboard Fire Trucks A - - 1.385 - - - - - - - - - - - - - - - 3.6) COMM/NAV I/D A - - 2.393 - - 0.100 - - 0.093 - - 0.091 - - - - - 0.091 3.7) Software Load A - - 1.215 - - 0.095 - - 0.089 - - 0.087 - - - - - 0.087 3.8) Non Destruct Inspection (NDI) A - - 5.376 - - 0.296 - - 0.272 - - 0.259 - - - - - 0.259 3.9) Cryogenics A - - 2.847 - - 0.200 - - 0.187 - - 0.178 - - - - - 0.178 3.10) Hydraulics A - - 2.730 - - 0.350 - - 0.327 - - 0.312 - - - - - 0.312 LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 11 of 43 P-1 Line #59 Volume 3 - 25 === page 76 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 3.11) Propulsion A 3.12) Platform Support A 3.13) Electrical A 3.14) Electronic Warfare A MAIS Code Unit Cost Subtotal: 3) ILS ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: A/C COMMON SUPPORT EQUIPMENT FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - - 10.153 - - 0.733 - - 2.062 - - 0.853 - - - - - 0.853 - - 18.954 - - 1.398 - - 1.278 - - 1.222 - - - - - 1.222 - - 10.763 - - 0.880 - - 0.804 - - 0.770 - - - - - 0.770 - - 1.420 - - 0.096 - - 0.090 - - 0.086 - - - - - 0.086 - - 65.447 - - 4.743 - - 5.758 - - 4.399 - - - - - 4.399 4) Production Engineering Support 4.1) Weapons Control A - - 19.718 - - 1.359 - - 1.273 - - 1.214 - - - - - 1.214 4.2) Vibration A - - 7.449 - - 0.419 - - 0.393 - - 0.374 - - - - - 0.374 4.3) Corrosion A - - 1.479 - - 0.124 - - 0.116 - - 0.111 - - - - - 0.111 4.4) Aircraft Wiring A - - 8.956 - - 0.581 - - 0.545 - - 0.520 - - - - - 0.520 4.5) Shipboard Fire Trucks A - - 12.327 - - - - - - - - - - - - - - - 4.6) COMM/NAV I/D A - - 17.102 - - 1.135 - - 1.063 - - 1.014 - - - - - 1.014 4.7) Software Load A - - 10.166 - - 0.888 - - 0.838 - - 0.799 - - - - - 0.799 4.8) Non Destruct Inspection (NDI) A - - 21.126 - - 1.311 - - 1.211 - - 1.152 - - - - - 1.152 4.9) Cryogenics A - - 20.199 - - 1.346 - - 1.262 - - 1.204 - - - - - 1.204 4.10) Hydraulics A - - 13.760 - - 1.348 - - 1.263 - - 1.204 - - - - - 1.204 A - - 37.253 - - 2.326 - - 2.794 - - 3.349 - - - - - 3.349 - - 46.075 - - 2.970 - - 2.785 - - 2.605 - - - - - 2.605 - - 18.447 - - 1.821 - - 1.707 - - 1.606 - - - - - 1.606 - - 16.352 - - 0.438 - - 0.411 - - 0.392 - - - - - 0.392 - - 250.409 - - 16.066 - - 15.661 - - 15.544 - - - - - 15.544 - - 37.655 - - 2.000 - - 2.000 - - 3.024 - - - - - 3.024 2.100 4.11) Propulsion (8) 4.12) Platform Support A 4.13) Electrical A 4.14) Electronic Warfare A Subtotal: 4) Production Engineering Support 5) Installations 5.1) Non FMP Installations A 5.2) FMP Installations A - - 37.567 - - 2.000 - - 2.000 - - 2.100 - - - - - Subtotal: 5) Installations - - 75.222 - - 4.000 - - 4.000 - - 5.124 - - - - - 5.124 Total - - 650.084 - - 54.123 - - 64.882 - - 72.764 - - - - - 72.764 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 12 of 43 P-1 Line #59 Volume 3 - 26 === page 77 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 P-1 Line Item Number / Title: 0705 / Common Ground Equipment Aggregated Items Title: A/C COMMON SUPPORT EQUIPMENT (2) The Mobile Nitrogen Gas Generator is used at Navy and USMC intermediate maintenance activities to service hydraulic system components, tires, landing gear system components, armament launcher devices, testing A/C OBOGS systems, purging oxygen systems, testing regulators, night vision goggles, RF waveguides, and be used in pneumatic systems. This is required to replace the current Mobile Nitrogen Generator which is facing obsolescence issues driving the cost of repairs and overhauls beyond what is a smart investment for the government. (3) FY27 funding increase supports the procurement of ETIRS units to maintain operational readiness. ETIRS units are vital for aircraft engine testing at Navy and USMC intermediate maintenance activities. Legacy ETI systems, experiencing critical parts obsolescence, are being replaced to prevent further degradation of aircraft engine testing capabilities and maintain fleet readiness. (4) (5) (6) Transportation Code in prior years was budgeted under Production Engineering Support. Transportation Cost are not included in Unit Price in prior years or within the Future Year Defense Plan (FYDP). FY27 is addressing Legacy Support Equipment obsolescence ECPs. Engineering Change Proposal (ECP) line created to address CSE emerging obsolescence issues identified requiring immediate support to maintain fleet capability. TEST PROGRAM SET (TPS) MIGRATION: TPSs are support equipment consisting of hardware, software and documentation required to test and verify as Ready-For-Issue (RFI). The budget requests funds for procurement of necessary hardware and NRE to offload support of existing legacy systems, as well as support of GFE requirements and stations at designated test integration facilities. (7) (8) FY 2027 NRE added for ETIRS to retrofit EDMs to production baseline post Milestone C (FY27 4Q). This is in support of Initial Operational Capability (IOC) in FY28 1Q. FY 2027 Increase significantly greater than inflation due to addition of Production Support Team personnel in preparation for fielding and sustainment. LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 13 of 43 P-1 Line #59 Volume 3 - 27 === page 78 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Aggregated Items: A/C COMMON SUPPORT EQUIPMENT FY Contractor and Location Method/Type or Funding Vehicle 1.2) COMM/NAV I/D - CRAFT Radio Test Set ECP 2025 TEL-INSTRUMENT / CARLSTADT, NJ SS / FFP NAWCAD LKE Nov 2024 Jun 2025 150 16,666.67 Y 1.2) COMM/NAV I/D - CRAFT Radio Test Set ECP 2026 TEL-INSTRUMENT / CARLSTADT, NJ SS / FFP NAWCAD LKE Jun 2026 Mar 2027 241 17,000.00 Y 1.2) COMM/NAV I/D - CRAFT Radio Test Set ECP 2027 TEL-INSTRUMENT / CARLSTADT, NJ SS / FFP NAWCAD LKE Aug 2027 Feb 2028 191 17,277.49 Y 2025 NSWC Crane / Crane, IN PO NSWC CRANE May 2025 May 2026 204 28,607.84 Y 2026 NSWC Crane / Crane, IN PO NSWC CRANE May 2026 May 2027 240 27,962.50 Y 2027 NSWC Crane / Crane, IN PO NSWC CRANE Sep 2027 Apr 2028 165 28,521.25 Y 2025 TBD / TBD C / TBD NAWCAD LKE Feb 2026 Feb 2027 2 330,000.00 Y Jun 2024 2026 TBD / TBD C / TBD NAWCAD LKE Jun 2026 Jun 2027 12 330,000.00 Y Jun 2024 (2) 2027 TBD / TBD C / TBD NAWCAD LKE Dec 2026 Jun 2027 10 330,000.00 Y Jun 2024 1.6) Cryogenics - Shore 1000/2000 Gallon LOX/LIN Tanks 2019 Kelvin Inernational Inc. / Newport News, VA C / FFP NAWCAD LKE Dec 2019 May 2022 10 226,633.00 Y May 2019 1.6) Cryogenics - Shore 1000/2000 Gallon LOX/LIN Tanks 2020 Kelvin Inernational Inc. / Newport News, VA C / FFP NAWCAD LKE Jul 2022 Jan 2023 21 182,285.71 Y 1.6) Cryogenics - Shore 1000/2000 Gallon LOX/LIN Tanks 2021 Kelvin Inernational Inc. / Newport News, VA C / FFP NAWCAD LKE Jun 2021 Feb 2023 20 178,900.00 Y 1.6) Cryogenics - Shore 1000/2000 Gallon LOX/LIN Tanks 2022 Kelvin Inernational Inc. / Newport News, VA C / FFP NAWCAD LKE Oct 2021 Apr 2022 7 180,857.14 Y 1.6) Cryogenics - Shore 1000/2000 Gallon LOX/LIN Tanks 2023 Kelvin Inernational Inc. / Newport News, VA C / FFP NAWCAD LKE Oct 2022 Apr 2023 1 183,400.00 Y 1.6) Cryogenics - Shore 1000/2000 Gallon LOX/LIN Tanks 2026 Kelvin Inernational Inc. / Newport News, VA C / FFP NAWCAD LKE Dec 2025 Jun 2026 19 188,578.95 Y 1.7) Hydraulics - Particle Counter 2025 D-2 INC. / Bourne, MA C / FFP NAWCAD LKE Aug 2025 Jan 2026 200 18,590.00 Y 1.7) Hydraulics - Particle Counter 2026 D-2 INC. / Bourne, MA C / FFP NAWCAD LKE Nov 2025 May 2026 200 18,960.00 Y 1.7) Hydraulics - Particle Counter 2027 D-2 INC. / Bourne, MA C / FFP NAWCAD LKE Nov 2026 May 2027 200 19,000.00 Y 1.11) Platform Support - CVN Class Ship Crash Crane 2021 Allied Systems Corp. / Sherwood, OR C / FFP NAWCAD LKE Oct 2021 Jun 2023 5 1,666K Y 1.11) Platform Support - CVN Class Ship Crash Crane 2022 Allied Systems Corp. / Sherwood, OR C / FFP NAWCAD LKE Apr 2022 Jun 2023 7 1,585K Y Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 0705 / Common Ground Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) Hardware 1.4) S/W Loader - Next Generation (†) Software Loader Upgrade 1.4) S/W Loader - Next Generation (†) Software Loader Upgrade 1.4) S/W Loader - Next Generation (†) Software Loader Upgrade 1.5) Cryogenics - Mobile Nitrogen Gas Generator (2) 1.5) Cryogenics - Mobile Nitrogen Gas Generator (2) 1.5) Cryogenics - Mobile Nitrogen Gas Generator LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 14 of 43 P-1 Line #59 Jul 2019 Volume 3 - 28 === page 79 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 FY Contractor and Location 1.11) Platform Support - CVN Class Ship Crash Crane 2023 Allied Systems Corp. / Sherwood, OR C / FFP NAWCAD LKE Nov 2022 Nov 2023 1 1,575K Y 1.13) Platform Support - L Class Ship Crash Crane 2023 Allied Systems Corp. / Sherwood, OR C / FFP NAWCAD LKE Nov 2022 Nov 2023 5 1,615K Y 1.13) Platform Support - L Class Ship Crash Crane 2024 Allied Systems Corp. / Sherwood, OR C / FFP NAWCAD LKE Nov 2023 Oct 2024 3 1,615K Y 2024 Essex Electro Engineers, Inc / Schaumburg, IL C / FFP NAWCAD LKE Dec 2023 Jun 2026 143 76,601.40 Y 2025 Essex Electro Engineers, Inc / Schaumburg, IL C / FFP NAWCAD LKE Nov 2024 Jan 2027 100 81,200.00 Y (†) 2023 Testek LLC / Wixon, MI C / FFP NAWCAD LKE Feb 2024 Jan 2027 16 630,750.00 Y (†) 2024 Testek LLC / Wixon, MI C / FFP NAWCAD LKE Nov 2023 Dec 2027 2 692,000.00 Y (†) 2025 Testek LLC / Wixon, MI C / FFP NAWCAD LKE Feb 2025 Jan 2028 8 690,625.00 Y (†) 2026 Testek LLC / Wixon, MI C / FFP NAWCAD LKE Oct 2025 May 2028 8 1,200K Y (†) 2027 Testek LLC / Wixon, MI C / FFP NAWCAD LKE Nov 2026 Sep 2028 2 1,200K Y 2027 LOCKHEAD MARTIN / FT WORTH C / FFP NAWCAD LKE Sep 2027 Sep 2028 6 3,762K Y 1.14) Electrical - Medium Capacity (†) MEPP 1.14) Electrical - Medium Capacity (†) MEPP 1.15) Electrical - AECTS Replacement/Modification 1.15) Electrical - AECTS Replacement/Modification 1.15) Electrical - AECTS Replacement/Modification 1.15) Electrical - AECTS Replacement/Modification 1.15) Electrical - AECTS Replacement/Modification 1.17) Propulsion - Engine Test Instrumentation Replacement System (ETIRS) (†) Aggregated Items: A/C COMMON SUPPORT EQUIPMENT Method/Type or Funding Vehicle Item Number / Title [DODIC] (3) O O C P-1 Line Item Number / Title: 0705 / Common Ground Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 15 of 43 P-1 Line #59 Volume 3 - 29 === page 80 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: A/C COMMON SUPPORT EQUIPMENT Fiscal Year 2020 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2019 1 OCT Fiscal Year 2021 Calendar Year 2020 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2021 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1) Hardware 1.4) S/W Loader - Next Generation Software Loader Upgrade 1 2025 NAVY 204 0 204 204 1 2026 NAVY 240 0 240 240 1 2027 NAVY 165 0 165 165 1.14) Electrical - Medium Capacity MEPP Prior Years Deliveries: 232 2 2024 NAVY 143 0 143 143 2 2025 NAVY 100 0 100 100 1.15) Electrical - AECTS Replacement/Modification Prior Years Deliveries: 18 3 2023 NAVY 16 0 16 16 3 2024 NAVY 2 0 2 2 3 2025 NAVY 8 0 8 8 3 2026 NAVY 8 0 8 8 3 2027 NAVY 2 0 2 2 O C T LI 0705 - Common Ground Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 43 S E P O C T N O V D E C J A N F E B P-1 Line #59 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 30 === page 81 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: A/C COMMON SUPPORT EQUIPMENT Fiscal Year 2022 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Fiscal Year 2023 Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1) Hardware 1.4) S/W Loader - Next Generation Software Loader Upgrade 1 2025 NAVY 204 0 204 204 1 2026 NAVY 240 0 240 240 1 2027 NAVY 165 0 165 165 1.14) Electrical - Medium Capacity MEPP Prior Years Deliveries: 232 2 2024 NAVY 143 0 143 143 2 2025 NAVY 100 0 100 100 1.15) Electrical - AECTS Replacement/Modification Prior Years Deliveries: 18 3 2023 NAVY 16 0 16 16 3 2024 NAVY 2 0 2 2 3 2025 NAVY 8 0 8 8 3 2026 NAVY 8 0 8 8 3 2027 NAVY 2 0 2 2 O C T LI 0705 - Common Ground Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 43 S E P O C T N O V D E C J A N F E B P-1 Line #59 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 31 === page 82 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: A/C COMMON SUPPORT EQUIPMENT Fiscal Year 2024 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) Hardware 1.4) S/W Loader - Next Generation Software Loader Upgrade 1 2025 NAVY 204 0 204 1 2026 NAVY 240 0 240 A - - - - - 204 240 1 2027 NAVY 165 0 165 165 1.14) Electrical - Medium Capacity MEPP Prior Years Deliveries: 232 2 2024 NAVY 143 0 143 2 2025 NAVY 100 0 100 A - - - - - - - - - - - - - - - - - - - - - - 143 A - - - - - - - - - - - 100 1.15) Electrical - AECTS Replacement/Modification Prior Years Deliveries: 18 3 2023 NAVY 16 0 16 3 2024 NAVY 2 0 2 3 2025 NAVY 8 0 8 3 2026 NAVY 8 0 8 3 2027 NAVY 2 0 2 A - - A - - - - - - - - - - - - - - - - - - - - 16 - - - - - - - - - - - - - - - - - - - - 2 A - - - - - - - - 8 - 8 2 O C T LI 0705 - Common Ground Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 18 of 43 S E P O C T N O V D E C J A N F E B P-1 Line #59 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 32 === page 83 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: A/C COMMON SUPPORT EQUIPMENT Fiscal Year 2026 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) Hardware 1.4) S/W Loader - Next Generation Software Loader Upgrade 1 2025 NAVY 204 0 204 1 2026 NAVY 240 0 240 1 2027 NAVY 165 0 165 - - - - - - - 17 A - 17 17 17 17 17 17 17 17 17 17 17 - - - - - - - - - - - 0 20 20 20 20 20 A - 140 165 1.14) Electrical - Medium Capacity MEPP Prior Years Deliveries: 232 2 2024 NAVY 143 0 143 - - - - - - - - 20 20 20 20 20 20 20 3 2 2025 NAVY 100 0 100 - - - - - - - - - - - - - - - 17 0 20 20 20 20 3 0 1.15) Electrical - AECTS Replacement/Modification Prior Years Deliveries: 18 3 2023 NAVY 16 0 16 - - - - - - - - - - - - - - - 3 2024 NAVY 2 0 2 - - - - - - - - - - - - - - - - - - - - - - - - 2 3 2025 NAVY 8 0 8 - - - - - - - - - - - - - - - - - - - - - - - - 8 3 2026 NAVY 8 0 8 A - - - - - - - - - - - - - - - - - - - - - - - - 8 3 2027 NAVY 2 0 2 A - - - - - - - - - - - 2 O C T LI 0705 - Common Ground Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 19 of 43 S E P O C T N O V D E C 1 J A N 1 F E B P-1 Line #59 1 M A R 1 A P R 1 M A Y 1 J U N 2 J U L 2 A U G 2 S E P Volume 3 - 33 4 === page 84 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: A/C COMMON SUPPORT EQUIPMENT Fiscal Year 2028 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1) Hardware 1.4) S/W Loader - Next Generation Software Loader Upgrade 1 2025 NAVY 204 204 0 1 2026 NAVY 240 100 140 20 20 20 20 20 20 20 0 1 2027 NAVY 165 0 165 - - - - - - 14 0 14 14 14 14 14 14 14 14 13 13 13 0 1.14) Electrical - Medium Capacity MEPP Prior Years Deliveries: 232 2 2024 NAVY 143 143 0 0 2 2025 NAVY 100 100 0 0 1.15) Electrical - AECTS Replacement/Modification Prior Years Deliveries: 18 3 2023 NAVY 16 12 4 3 2024 NAVY 2 0 2 - 2 - 3 2025 NAVY 8 0 8 - - - 3 2026 NAVY 8 0 8 - - - - - - - 3 2027 NAVY 2 0 2 - - - - - - - O C T LI 0705 - Common Ground Equipment Navy 2 N O V 0 2 D E C 0 2 J A N 2 F E B 2 M A R 2 A P R 0 2 2 M A Y 2 J U N 2 J U L 0 A U G UNCLASSIFIED Page 20 of 43 2 S E P 0 O C T N O V D E C J A N F E B P-1 Line #59 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 34 === page 85 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Aggregated Items: A/C COMMON SUPPORT EQUIPMENT Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 NSWC Crane - Crane, IN 10 20 240 0 4 12 16 0 0 7 7 2 Essex Electro Engineers, Inc - Schaumburg, IL 30 30 360 0 1 10 11 0 1 6 7 3 Testek LLC - Wixon, MI 1 5 16 0 11 15 26 0 1 22 23 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 21 of 43 P-1 Line #59 Volume 3 - 35 === page 86 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: ICP/HEADQUARTERS MANAGED SUPPORT EQUIPMENT FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) Hardware 1.1) CSE Deficits (9) 1.2) CSE Replacement Equipment A A (10) Subtotal: 1) Hardware - - 68.063 - - 8.564 - - 5.622 - - 0.800 - - - - - 0.800 - - 166.848 - - 29.344 - - 3.275 - - 1.767 - - - - - 1.767 - - 234.911 - - 37.908 - - 8.897 - - 2.567 - - - - - 2.567 - - 8.031 - - 0.842 - - 0.842 - - 0.850 - - - - - 0.850 - - 58.215 - - 4.434 - - 4.072 - - 4.202 - - - - - 4.202 - - 66.246 - - 5.276 - - 4.914 - - 5.052 - - - - - 5.052 2) Production Engineering 2.1) CSE Deficits A 2.2) CSE Replacement Equipment A Subtotal: 2) Production Engineering 3) Fleet Readiness Team Initiatives 3.1) FRT NAE Corrosion Mitigation A - - 0.300 - - 0.150 - - - - - - - - - - - - Subtotal: 3) Fleet Readiness Team Initiatives - - 0.300 - - 0.150 - - - - - - - - - - - - Total - - 301.457 - - 43.334 - - 13.811 - - 7.619 - - - - - 7.619 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (9) CSE Deficits: Includes procurement of additional CSE quantities to address inventory deficits to satisfy outfitting requirements or modification of existing CSE to extend service life. (10) FY27 funding decrease represents a reallocation of resources to prioritize the ETIRS program. LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 22 of 43 P-1 Line #59 Volume 3 - 36 === page 87 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: PECULIAR SUPPORT EQUIPMENT (PSE) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) AIRCRAFT T/M/S 1.1) E-2 C/D PSE A - - 21.735 - - - - - - - - - - - - - - - 1.2) H-60 R/S PSE A - - 20.703 - - - - - - - - - - - - - - - 1.3) J-85 PSE A - - 0.423 - - - - - - - - - - - - - - - 1.4) T-45 PSE A - - 3.187 - - - - - - - - - - - - - - - 1.5) AV-8B PSE A - - 18.226 - - 2.761 - - 2.553 - - - - - - - - - 1.6) E-6 PSE A - - 0.135 - - - - - - - - - - - - - - - 1.7) H-53 PSE A - - 0.367 - - - - - - - - - - - - - - - 1.8) Adversary F-16 B - - 11.754 - - - - - 0.647 - - - - - - - - - 1.9) F/A-18A-F / EA-18G A - - 14.992 - - - - - - - - - - - - - - - 1.10) C-130T & C-40 A - - 4.936 - - 3.211 - - 5.341 - - - - - - - - - A - - 11.697 - - 7.786 - - - - - 0.534 - - - - - 0.534 1.12) H-1 USMC A - - 4.132 - - - - - - - - - - - - - - - 1.13) E-6 A - - 4.491 - - - - - - - - - - - - - - - 1.14) E-2 C/D PSE A - - 22.372 - - 10.977 - - 30.135 - - 10.268 - - - - - 10.268 - - 4.407 - - - - - - - - - - - - - - - - - 16.429 - - 8.305 - - 8.196 - - 8.089 - - - - - 8.089 - - 9.123 - - - - - - - - - - - - - - - - - 10.200 - - - - - - - - - - - - - - - - - 179.309 - - 33.040 - - 46.872 - - 18.891 - - - - - 18.891 - - 6.165 - - 0.889 - - - - - - - - - - - - - - 8.855 - - - - - - - - - - - - - - - - - 25.000 - - - - - - - - - - - - - - - - - 40.020 - - 0.889 - - - - - - - - - - - - - - - - - - - - - - - 11.180 - - - - - 11.180 1.11) V-22 0204152N (11) (12) 1.15) H-60 R/S PSE 0204243N A 1.16) F/A-18A-F / EA-18G 0204136N A 1.17) H-1 USMC 0206131M A 1.18) Adversary F-5 USMC A (13) Subtotal: 1) AIRCRAFT T/M/S 2) FLEET READINESS CENTER (FRC) 2.1) Equipment Reconstitution A 2.2) Adaptive Manufacturing USMC A 2.3) Ready Based Aircraft (RBA) Investment A Subtotal: 2) FLEET READINESS CENTER (FRC) 3) V-22 REVAMP 3.1) REVAMP (14) A LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 23 of 43 P-1 Line #59 Volume 3 - 37 === page 88 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: PECULIAR SUPPORT EQUIPMENT (PSE) FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) Subtotal: 3) V-22 REVAMP - - 0.000 - - - - - - - - 11.180 - - - - - 11.180 Total - - 219.329 - - 33.929 - - 46.872 - - 30.071 - - - - - 30.071 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (11) Procurement of support equipment (SE) sets required to sustain V-22B aircraft maintenance activities at the Depot, Organizational (O-level), and Intermediate (I-level) maintenance levels. SE will support both shore-based and shipboard operations. This funding provides critical SE necessary for the repair and maintenance of V-22B aircraft, enabling operational readiness. (12) (13) (14) Procure sets of E2/C2 Depot, O and I level deficit SE needed to service the E-2C/C2 and E-2D aircraft for shore base and shipboard locations. Procure sets of F/A-18 Depot, O level and I level deficit SE needed to service the F/A-18 A-F and EA-18G aircraft for shore base and shipboard locations. Funds will enable procurement of Common and Peculiar Support Equipment (PSE). This acquisition is required to support the following critical mission requirements: the MV-22 reactivation of Marine Medium Tiltrotor Squadron 264 (VMM-264); the initial outfitting for the operational standup of MV-22 capabilities on LHA-9 and LHA-10; and the resourcing of Programmed Maintenance Interval (PMI) efforts with necessary wing stands and slings. LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 24 of 43 P-1 Line #59 Volume 3 - 38 === page 89 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: CONSOLIDATED AUTOMATED SUPPORT SYSTEM Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) Hardware 1.1) RT CASS 1.2) eCASS (15)(†) 1.3) FourthGeneration ElectroOptics (EO4) A 1,740K 149 259.280 - - - - - - - - - - - - - - - A 2,603K 328 853.936 1,549K 13 20.142 - - - - - - - - - - - - - - - 2,068K 24 49.638 1,968K 22 43.288 3,402K 12 40.820 - - - 3,402K 12 40.820 - - - - - - 559,400.00 50 27.970 2,997K 5 14.983 - - - 2,997K 5 14.983 - - 1,113.216 - - 69.780 - - 71.258 - - 55.803 - - - - - 55.803 B (16)(†) 1.4) eCASS Mid-Life Upgrade (MLU) (17)(†) B Subtotal: 1) Hardware 2) ECP 2.1) RT CASS A - - 108.352 - - - - - - - - - - - - - - - 2.2) eCASS B - - 8.396 - - 1.848 - - 4.152 - - - - - - - - - 2.3) FourthGeneration ElectroOptics (EO4) B - - - - - 4.114 - - 1.621 - - - - - - - - - 2.4) eCASS Mid-Life B - - - - - - - - - - - 9.929 - - - - - 9.929 - - 116.748 - - 5.962 - - 5.773 - - 9.929 - - - - - 9.929 Upgrade (MLU) (18) Subtotal: 2) ECP 3) ILS 3.1) RT CASS A - - 44.920 - - - - - - - - - - - - - - - 3.2) eCASS B - - 54.245 - - 2.650 - - 1.983 - - 0.127 - - - - - 0.127 3.3) FourthGeneration ElectroOptics (EO4) B - - 1.549 - - 1.545 - - 1.115 - - 0.761 - - - - - 0.761 3.4) eCASS Mid-Life B - - - - - - - - - - - 6.151 - - - - - 6.151 - - 100.714 - - 4.195 - - 3.098 - - 7.039 - - - - - 7.039 Upgrade (MLU) (19) Subtotal: 3) ILS 4) Production Engineering 4.1) RT CASS A - - 93.745 - - - - - - - - - - - - - - - 4.2) eCASS B - - 57.602 - - 3.869 - - 3.059 - - 0.234 - - - - - 0.234 4.3) FourthGeneration ElectroOptics (EO4) B - - 1.570 - - 1.569 - - 1.138 - - 0.524 - - - - - 0.524 4.4) eCASS Mid-Life B - - - - - - - - - - - 6.334 - - - - - 6.334 - - 152.917 - - 5.438 - - 4.197 - - 7.092 - - - - - 7.092 Upgrade (MLU) (20) Subtotal: 4) Production Engineering 5) Non FMP Installations 5.1) RT CASS A - - 29.076 - - - - - - - - - - - - - - - 5.2) eCASS B - - 24.785 - - 2.754 - - 3.432 - - - - - - - - - LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 25 of 43 P-1 Line #59 Volume 3 - 39 === page 90 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 5.3) FourthGeneration ElectroOptics (EO4) B 5.4) eCASS Mid-Life B Upgrade (MLU) (21) MAIS Code Unit Cost Subtotal: 5) Non FMP Installations ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: CONSOLIDATED AUTOMATED SUPPORT SYSTEM FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - - 0.874 - - 1.551 - - 1.583 - - - - - - - - - - - - - - - - - - - - 4.439 - - - - - 4.439 - - 54.735 - - 4.305 - - 5.015 - - 4.439 - - - - - 4.439 6) FMP Installations 6.1) RT CASS A - - 31.275 - - - - - - - - - - - - - - - 6.2) eCASS B - - 25.628 - - 3.910 - - 4.314 - - 0.500 - - - - - 0.500 6.3) FourthGeneration ElectroOptics (EO4) B - - 1.699 - - 1.295 - - 1.323 - - 0.164 - - - - - 0.164 6.4) eCASS Mid-Life B - - - - - - - - - - - 6.111 - - - - - 6.111 Subtotal: 6) FMP Installations - - 58.602 - - 5.205 - - 5.637 - - 6.775 - - - - - 6.775 Total - - 1,596.932 - - 94.885 - - 94.978 - - 91.077 - - - - - 91.077 Upgrade (MLU) (22) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (15) (16) (17) There are four (4) different configurations of eCASS with the RF configuration being the costliest. FY27 procurements increased from 8 to 12 units to address growing fleet resource requirements. The increased QTY price is due to significant increase in material. There are multiple configurations of eCASS which require different components for upgrades, some of which being more costly than others. FY27 procurement quantities reduced from 68 to 5 to prioritize funding for EO4 units. The increased QTY price is due to significant increase in material. (18) (19) (20) (21) (22) FY27 increase reflects a shift in resources to the eCASS MLU, supporting the next phase of the CASS Family of Testers. FY27 increase reflects a shift in resources to the eCASS MLU, supporting the next phase of the CASS Family of Testers. FY27 increase reflects a shift in resources to the eCASS MLU, supporting the next phase of the CASS Family of Testers. FY27 increase reflects a shift in resources to the eCASS MLU, supporting the next phase of the CASS Family of Testers. FY27 increase reflects a shift in resources to the eCASS MLU, supporting the next phase of the CASS Family of Testers. LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 26 of 43 P-1 Line #59 Volume 3 - 40 === page 91 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 0705 / Common Ground Equipment FY Contractor and Location Method/Type or Funding Vehicle Aggregated Items: CONSOLIDATED AUTOMATED SUPPORT SYSTEM Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) Hardware 1.2) eCASS (15)(†) 2024 Lockheed Martin (FRP 2) / Orlando, FL C / FFP NAWCAD LKE Dec 2023 Jun 2025 27 2,612K Y Apr 2023 1.2) eCASS (15)(†) 2025 Lockheed Martin (FRP 2) / Orlando, FL C / FFP NAWCAD LKE Jun 2025 Dec 2026 13 1,549K Y Apr 2024 2025 Lockheed Martin (FRP 1) / Orlando, FL C / FFP NAWCAD LKE Jun 2025 Jun 2026 24 2,068K Y Jun 2024 2026 Lockheed Martin (FRP 1) / Orlando, FL C / FFP NAWCAD LKE Jun 2026 Jun 2027 22 1,968K Y Jun 2025 2027 Lockheed Martin (FRP 1) / Orlando, FL C / FFP NAWCAD LKE Jun 2027 Jun 2028 12 3,402K Y Jun 2026 2026 Lockheed Martin (FRP 1) / Orlando, FL C / FFP NAWCAD LKE Dec 2025 Apr 2027 50 559,400.00 Y Apr 2025 2027 Lockheed Martin (FRP 1) / Orlando, FL C / FFP NAWCAD LKE Dec 2026 Apr 2028 5 2,997K Y Apr 2026 1.3) Fourth-Generation ElectroOptics (EO4) (16)(†) 1.3) Fourth-Generation ElectroOptics (EO4) (16)(†) 1.3) Fourth-Generation ElectroOptics (EO4) (16)(†) 1.4) eCASS Mid-Life Upgrade (MLU) (17)(†) 1.4) eCASS Mid-Life Upgrade (MLU) (†) (17)(†) indicates the presence of a P-21 LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 27 of 43 P-1 Line #59 Volume 3 - 41 === page 92 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: CONSOLIDATED AUTOMATED SUPPORT SYSTEM Fiscal Year 2024 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) Hardware 1.2) eCASS (15) Prior Years Deliveries: 301 4 2024 NAVY 27 0 27 4 2025 NAVY 13 0 13 A - - - - 13 A - - - - 24 1.3) Fourth-Generation Electro-Optics (EO4) A - - - - - - - - - - - - - - - - - - 2 3 3 3 16 (16) 5 2025 NAVY 24 0 24 5 2026 NAVY 22 0 22 22 5 2027 NAVY 12 0 12 12 50 1.4) eCASS Mid-Life Upgrade (MLU) (17) 6 2026 NAVY 50 0 50 6 2027 NAVY 5 0 5 5 O C T LI 0705 - Common Ground Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 28 of 43 S E P O C T N O V D E C J A N F E B P-1 Line #59 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 42 === page 93 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: CONSOLIDATED AUTOMATED SUPPORT SYSTEM Fiscal Year 2026 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) Hardware 1.2) eCASS (15) Prior Years Deliveries: 301 4 2024 NAVY 27 11 16 4 2025 NAVY 13 0 13 - - - - - - - - - - - - - - - - 1.3) Fourth-Generation Electro-Optics (EO4) 3 2 2 2 2 1 1 0 - - - - - - 2 2 2 2 2 2 1 0 (16) 5 2025 NAVY 24 0 24 5 2026 NAVY 22 0 22 5 2027 NAVY 12 0 12 1.4) eCASS Mid-Life Upgrade (MLU) 3 2 2 A - 2 - 2 - 2 - 2 - 2 - 2 - 2 - 2 - 2 - 2 - 0 - 2 2 A - 2 - 2 - - 14 12 (17) 6 2026 NAVY 50 0 50 6 2027 NAVY 5 0 5 A O C T LI 0705 - Common Ground Equipment Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 29 of 43 S E P O C T N O V - - - - A - - - - D E C J A N F E B P-1 Line #59 M A R 5 5 A P R 4 M A Y 4 J U N 4 J U L 4 A U G 24 S E P Volume 3 - 43 5 === page 94 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: CONSOLIDATED AUTOMATED SUPPORT SYSTEM Fiscal Year 2028 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1) Hardware 1.2) eCASS (15) Prior Years Deliveries: 301 4 2024 NAVY 27 27 0 0 4 2025 NAVY 13 13 0 0 1.3) Fourth-Generation Electro-Optics (EO4) (16) 5 2025 NAVY 24 24 0 5 2026 NAVY 22 8 14 5 2027 NAVY 12 0 12 1.4) eCASS Mid-Life Upgrade (MLU) 0 2 2 - 2 - 2 - 2 - 2 - 2 - 0 - - 1 - 1 1 1 1 1 1 1 1 1 1 1 1 0 (17) 6 2026 NAVY 50 26 24 6 2027 NAVY 5 0 5 4 4 O C T LI 0705 - Common Ground Equipment Navy 4 N O V 4 D E C 4 J A N 4 F E B 0 M A R 1 A P R M A Y J U N J U L 1 A U G UNCLASSIFIED Page 30 of 43 S E P 1 O C T N O V 1 D E C 0 J A N F E B P-1 Line #59 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 44 === page 95 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Aggregated Items: CONSOLIDATED AUTOMATED SUPPORT SYSTEM Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Lockheed Martin (FRP 2) Orlando, FL 24 36 48 0 9 16 25 0 3 18 21 2 Lockheed Martin (FRP 1) Orlando, FL 15 15 24 0 12 12 24 0 8 12 20 3 Lockheed Martin (FRP 1) Orlando, FL 50 65 80 0 9 16 25 0 3 18 21 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 31 of 43 P-1 Line #59 Volume 3 - 45 === page 96 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: MOBILE MAINTENANCE FACILITIES Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) HARDWARE 1.1) Mobile Facility (†) A Vans 1.2) Complex Decomplex Tool A 1.3) Environmental A (†) Control Units 1.4) Frequency Converters A 1.5) Static Mobile Frequency Converters A 1.6) Tactical Quite Generator A Subtotal: 1) HARDWARE 91,052.71 702 63.919 40 3.615 40 3.711 - 0.702 - - - - 904 5.781 52 0.219 49 0.212 - 0.520 - - - - - - 17 2.125 - - - - - - - 28.473 - - - - - - 101.520 - - 3.834 - - 29.270 - - - - 29.270 - - - 45.764 - - 6,394.91 125,000.00 90,375.00 40 3.790 - - - - - - - - 48 0.213 - - - - - - - - - - - - - - - - - - - - - - - 3.923 - - 4.003 1.495 - - 1.524 - - - 1.495 - - 1.524 - - - 2.051 - - 2.141 45.764 - - 2.051 - - 4,211.00 92,775.00 4,322.62 94,750.00 40 3.790 - - 48 0.213 - - - - - - - - - - - - - - - - - 4.003 1.559 - - - - - 1.559 - 1.559 - - - - - 1.559 - - 2.125 - - - - - 2.125 2.141 - - 2.125 - - - - - 2.125 - 4,437.00 94,750.00 4,437.00 2) ILS 2.1) Non-FMP Installations A Subtotal: 2) ILS 3) Production Engineering 3.1) Mobile Facility Vans A Subtotal: 3) Production Engineering 4) Miscellaneous Support - - 2.072 - - - - - - - - - - - - - - Subtotal: 4) Miscellaneous Support 4.1) Publications A - - 2.072 - - - - - - - - - - - - - - - Total - - 178.626 - - 7.380 - - 7.588 - - 7.687 - - - - - 7.687 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 32 of 43 P-1 Line #59 Volume 3 - 46 === page 97 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Aggregated Items: MOBILE MAINTENANCE FACILITIES FY Contractor and Location Method/Type or Funding Vehicle 1.1) Mobile Facility Vans 2024 Gichner Shelter / Dallastown, PA C / IDDQ NAWCAD LKE Oct 2023 Apr 2024 40 88,975.00 Y Jul 2020 1.1) Mobile Facility Vans 2025 Gichner Shelter / Dallastown, PA C / IDDQ NAWCAD LKE Oct 2024 Apr 2025 40 90,375.00 Y Jul 2020 1.1) Mobile Facility Vans 2026 Gichner Shelter / Dallastown, PA C / IDDQ NAWCAD LKE Oct 2025 Apr 2026 40 92,775.00 Y 1.1) Mobile Facility Vans 2027 Gichner Shelter / Dallastown, PA C / TBD NAWCAD LKE Oct 2026 Apr 2027 40 94,750.00 Y 1.3) Environmental Control Units 2024 Env. Sys. / Jacksonville, FL C / IDDQ NAWCAD LKE Oct 2023 Mar 2024 51 3,915.51 Y Jun 2017 1.3) Environmental Control Units 2025 Env. Sys. / Jacksonville, FL C / IDDQ NAWCAD LKE May 2025 Aug 2025 52 4,211.00 Y Jun 2017 1.3) Environmental Control Units 2026 Env. Sys. / Jacksonville, FL C / IDDQ NAWCAD LKE May 2026 Oct 2026 49 4,322.62 Y Jun 2017 1.3) Environmental Control Units 2027 Env. Sys. / Jacksonville, FL C / TBD NAWCAD LKE May 2027 Oct 2027 48 4,437.00 Y Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 0705 / Common Ground Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) HARDWARE LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 33 of 43 P-1 Line #59 Volume 3 - 47 === page 98 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: GENERAL SKILLS TRAINING Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) Hardware: General Skills Training 1.1) A School Training System Upgrades A 1.2) ACTS Expeditionary Laptop A Upgrades (23)(†) 1.3) ACTS - Prior Year INACTIVE A 1.4) ATC - NATTC 15G31 SATS Block Update A 1.5) ATC - 15G31 A Block Upgrades (24) 1.7) ATC - Electronic Training Management Tool A (25) 1.8) ATC - Learning Training Tool / Web Based Self Paced A (26) 1.9) ATC - 15G30 ASATS Block Upgrade A 1.12) ATC - Prior Year INACTIVE A 1.13) NASTP - 9H1 Helo Hoist Upgrades A 1.14) NASTP Parachute Descent Trainer (PDT) Upgrades A 1.15) NASTP - Cold Water Immersion Trainer A 1.18) NASTP Normobaric Hypoxia Chamber Regulator A (27) and Upgrade - - 49.519 - 0.302 - - - - - - - 300 1.531 50 0.139 50 0.150 25 0.088 - - - - - 0.250 - - - - - - - - - - - - - - 5.046 - - - - - - - - - - - - - 5.264 - - - - - 5.000 - - 1.260 - - - - - - - - - - - - 2.000 - - - - - - - - - - - - - - - - 5.172 - - - - - - 43.179 - - - - - - - - 5.646 - - 1.499 - - - - 3.871 - - - - - - - - - - - - - - - - - 13.414 - - - 5.921 - - 5.969 5,103.33 - - - 25 0.088 - - - - - - - - - - - 1.260 - - - - - 2.000 2.000 - - - - - 2.000 - - - - - - - - - - - - - - - - - 1.500 - - 1.600 - - - - - 1.600 - - - - - - - - - - - - - 0.100 - - - - - - - - - - - - 0.890 - - 0.930 - - - - - 0.930 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.268 - - 0.472 - - 0.488 - - - - - 0.488 2,780.00 - 3,000.00 - 3,520.00 - 3,520.00 (28) 1.23) NASTP - Prior Year INACTIVE A 1.24) LSO - Training System Upgrades A 1.25) Common ASW - Interactive Multi- A LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 34 of 43 P-1 Line #59 Volume 3 - 48 === page 99 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] Sensors Analysis Trainer (IMAT) Upgrades ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: GENERAL SKILLS TRAINING FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) (29) 1.26) Common ASW Prior Year INACTIVE A 1.27) ASM Cloud Migration A Subtotal: 1) Hardware: General Skills Training - - 0.625 - - - - - - - - - - - - - - - - - 0.980 - - - - - - - - - - - - - - - - - 141.215 - - 7.380 - - 8.112 - - 8.366 - - - - - 8.366 - - - - - - - - - - - 86.800 - - - - - 86.800 - - 0.000 - - - - - - - - 86.800 - - - - - 86.800 2) Hardware: Career Training Continuum 2.1) Ready Relevant Maintenance Trainers A (30) Subtotal: 2) Hardware: Career Training Continuum 3) Production Engineering: General Skills Training 3.1) A School A - - 2.493 - - - - - - - - - - - - - - - 3.2) ACTS A - - 0.120 - - - - - 0.006 - - 0.005 - - - - - 0.005 3.3) ATC A - - 8.421 - - 1.081 - - 0.964 - - 0.814 - - - - - 0.814 3.4) NASTP A - - 14.530 - - 1.406 - - 0.889 - - 0.853 - - - - - 0.853 3.5) LSO A - - 1.871 - - - - - - - - - - - - - - - 3.6) Common ASW A - - 3.330 - - 0.256 - - 0.091 - - 0.085 - - - - - 0.085 - - 30.765 - - 2.743 - - 1.950 - - 1.757 - - - - - 1.757 - - - - - - - - - - - 10.500 - - - - - 10.500 - - 0.000 - - - - - - - - 10.500 - - - - - 10.500 Subtotal: 3) Production Engineering: General Skills Training 4) Production Engineering: Career Training Continuum 4.1) Ready Relevant Learning (31) A Subtotal: 4) Production Engineering: Career Training Continuum 5) Production Support: General Skills Training 5.1) A School A - - 1.354 - - - - - - - - - - - - - - - 5.2) ACTS A - - 1.011 - - 0.052 - - 0.034 - - 0.029 - - - - - 0.029 5.3) ATC A - - 5.497 - - 0.554 - - 0.470 - - 0.428 - - - - - 0.428 5.4) NASTP A - - 5.704 - - 0.733 - - 0.476 - - 0.426 - - - - - 0.426 5.5) LSO A - - 0.821 - - - - - - - - - - - - - - - 5.6) Common ASW A - - 1.433 - - 0.025 - - 0.155 - - 0.143 - - - - - 0.143 - - 15.820 - - 1.364 - - 1.135 - - 1.026 - - - - - 1.026 - - - - - - - - - - 4.500 - - - - - 4.500 Subtotal: 5) Production Support: General Skills Training 6) Production Support: Career Training Continuum 6.1) Ready Relevant Learning (32) A - LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 35 of 43 P-1 Line #59 Volume 3 - 49 === page 100 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: GENERAL SKILLS TRAINING FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) Subtotal: 6) Production Support: Career Training Continuum - - 0.000 - - - - - - - - 4.500 - - - - - 4.500 Total - - 187.800 - - 11.487 - - 11.197 - - 112.949 - - - - - 112.949 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (23) (24) ACTS - Expeditionary Laptop Upgrades: FY 2027 funding upgrades 25 Air Combat Training System (ACTS) expeditionary Laptops that provide a mobile ACTS training capability to deploying Aircrew. ATC - 15G34 Block Upgrades: FY 2027 funds block upgrade of the ATC 15G34TSS. The Device 15G34 Tower Simulation System (TSS) provides realistic training for Tower Air Traffic Controllers in a non-operational environment. This upgrade/replacement is scheduled to address performance change requests submitted by Fleet users as well as hardware and/or software obsolesce issues. Total systems required: Thirty-eight(38). (25) ATC - Electronic Training Management Tool: FY 2027 funds the development and delivery of an Electronic Training Jacket and Training Management System (web-based) to assess individual training requirements and readiness, manage Navy and Marine Corps formal, general military and technical training, qualification, certifications and licenses, and create short and long term training action plans for individuals. Total systems required: One (1). (26) ATC - Learning Training Tool/Web based-self paced: FY 2027 funds the development and delivery of an interactive educational environment that will provide ATC training courses to the fleet. Additionally, the distribution and delivery of a self-paced and assessing training system used to teach basic and intermediate air traffic control concepts that will leverage existing technology to expand simulated training, focusing on the radar and tower portion of ATC services. Total systems required: Forty-two (42). (27) NASTP - 9H1 Helo Hoist Upgrades: FY 2027 upgrades one Helo Hoist/POST for FRCE and replaces corroded poolside platforms with a non-corrosive fiberglass reinforced polymer for improved structural integrity and safety. Final year of multi-year funded project. (28) (29) NASTP - Normobaric Hypoxia Chamber Regulator and Upgrade: FY 2027 funding upgrades will eliminate dependency on outside entities for NHT regulator test-and-check and maintenance. Common ASW - Interactive Multi-Sensors Analysis Trainer (IMAT) Upgrades: FY 2027 funding upgrades the Interactive Multi-Sensors Analysis Trainer (IMAT) trainer courseware to incorporate the latest learning technology and ASW threat analysis. (30) RRL - FY2027 funds will be used to procure: MH-60 Fuel Management Control Panel Trainers, MH-60 Crew Hover Control Panel Trainers, MH-60 Cyclic/Collective Control Stick Maintenance Trainers, MH-60 Auxiliary Relay Panel #1#4s, MH-60 Fuel Cell Trainers, MH-60 Blade Fold Trainers, MH-60 Tail/RAST/Hoist Trainers, MH-60 Bleed Air Training Systems, Air Conditioning Pressurization Trainers, MH-60R Avionics Maintenance Trainers, and MH-60S Avionics Maintenance Trainers. (31) (32) Production Engineering includes annualized Navy Working Capital Funds to support engineering efforts in support of Ready Relevant Learning Maintenance Trainers. Product Support includes annualized Navy Working Capital Funds to support program management and aquisistion efforts in support of Ready Relevant Learning Maintenance Trainers. LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 36 of 43 P-1 Line #59 Volume 3 - 50 === page 101 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 0705 / Common Ground Equipment Method/Type or Funding Vehicle Aggregated Items: GENERAL SKILLS TRAINING Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty RFP Issue Date FY Contractor and Location 2023 New Technology Solutions / Fremont, CA C / FFP NAWCTSD Mar 2023 Jul 2023 50 3,060.00 Y Jan 2023 2024 New Technology Solutions / Fremont, CA C / FFP NAWCTSD Mar 2024 Jul 2024 50 3,120.00 Y Jan 2024 2025 New Technology Solutions / Fremont, CA C / FFP NAWCTSD Mar 2025 Jul 2025 50 2,780.00 Y Jan 2025 2026 New Technology Solutions / Fremont, CA C / FFP NAWCTSD Mar 2026 Jul 2026 50 3,000.00 Y Jan 2026 2027 New Technology Solutions / Fremont, CA C / FFP NAWCTSD Mar 2027 Jul 2027 25 3,520.00 Y Jan 2027 (Each) 1) Hardware: General Skills Training 1.2) ACTS - Expeditionary Laptop Upgrades (23) 1.2) ACTS - Expeditionary Laptop Upgrades (23) 1.2) ACTS - Expeditionary Laptop Upgrades (23) 1.2) ACTS - Expeditionary Laptop Upgrades (23) 1.2) ACTS - Expeditionary Laptop Upgrades (23) LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 37 of 43 P-1 Line #59 Volume 3 - 51 === page 102 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: TOPSCENE FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) Mission Rehearsal Pre-Planned (Topscene) 1.1) Product Improvement A Subtotal: 1) Mission Rehearsal PrePlanned (Topscene) 1,250K 6 7.503 - - - - - - - - - - - - - - - - - 7.503 - - - - - - - - - - - - - - - - - 1.275 - - - - - - - - - - - - - - - - - 1.275 - - - - - - - - - - - - - - - 2) ILS 2.1) Topscene A Subtotal: 2) ILS 3) Acceptance Testing - - 1.845 - - - - - - - - - - - - - - - Subtotal: 3) Acceptance Testing 3.1) Topscene A - - 1.845 - - - - - - - - - - - - - - - Total - - 10.623 - - - - - - - - - - - - - - - Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 38 of 43 P-1 Line #59 Volume 3 - 52 === page 103 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: OTHER FLIGHT TRAINING FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) Hardware 1.1) USMC Fed Sim - MCAT Aviation Dist Virtual Trng Environ (ADVTE) Mod A 1.2) USMC Fed Sim -MCAT Interservice Network Connectivity Modernization A 1.3) USMC Fed Sim - Marine Common Aircrew Trainer (MCAT) A Modernization A (35) 1.5) USMC Fed Sim - Marine Common Aircrew Learning Mgmt System A 1.6) USMC Fed Sim - CH-53 Trainer Modernization A 1.7) USMC Fed Sim - CH-53E Aircrew Procedure Trnr (APT) Modernization A 1.8) USMC Fed Sim - KC-130 Trainer A Modernization (36) 1.9) USMC Fed Sim - H-1 Trainer Modernization A (37) 1.10) USMC Fed Sim - MV-22 CFTD Modernization - 48.129 - - 6.550 - - 12.177 - - 26.375 - - - - - 26.375 - - 9.886 - - 9.272 - - 4.000 - - - - - - - - - - - 10.296 - - 1.572 - - - - - 19.016 - - - - - 19.016 - - 0.143 - - - - - 0.660 - - 0.680 - - - - - 0.680 - - 1.314 - - 1.386 - - 1.550 - - - - - - - - - - - 31.539 - - - - - 8.000 - - - - - - - - - - - 8.616 - - - - - - - - - - - - - - - - - 76.033 - - 7.480 - - 23.884 - - 13.600 - - - - - 13.600 - - 94.736 - - 33.397 - - 13.917 - - 3.400 - - - - - 3.400 - - 116.869 - - 13.598 - - 14.693 - - 9.255 - - - - - 9.255 - - 52.242 - - - - - - - - - - - - - - - - - - - - - - - - - - 0.580 - - - - - 0.580 - - - - - - - - - - - 5.300 - - - - - 5.300 (34) 1.4) USMC Fed Sim Marine Maintenance Courseware - (33) A (38) 1.11) USMC Fed Sim - FA-18 C/D Tact Operational Flt Trnr (TOFT) Modernization A 1.12) USMC Fed Sim - MQ-9 Tech Refresh A 1.13) USMC Fed Sim - VH-92A Aircrew A (39) LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 39 of 43 P-1 Line #59 Volume 3 - 53 === page 104 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD Training Device Modernization A 1.15) NASMP - NCTE Nodes A 1.16) NASMP Common Simulation A Models Upgrades (41) 1.17) NASMP - Cross Domain Solution (CDS)/Network Upgrades A 1.18) NASMP NADTC & Distributed Mission Training (DMT) Enablers A (Each) ($ M) Unit Cost ($) Qty (Each) Unit Cost ($ M) ($) Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - - 1,100K 3 160.670 - - - - - - - - - - - - - - - 3.299 - - - - - - - - - - - - - - - - - 35.099 - - 8.038 - - 8.229 - - 8.024 - - - - - 8.024 - - 2.046 - - - - - - - - - - - - - - - - - 39.167 - - 7.843 - - 7.320 - - 8.836 - - - - - 8.836 - - 138.718 - - 4.477 - - 24.099 - - 14.207 - - - - - 14.207 - - 81.047 - - 44.000 - - 44.000 - - 55.102 - - - - - 55.102 A (43) 1.20) NASMP Integrated Training Facility ($) Qty FY 2027 Base Total Cost (42) 1.19) NASMP Carrier Air Wing (CVW) DMT Upgrades Code Unit Cost FY 2026 Total Cost (40) 1.14) Prior Year Inactive MARINE Upgrades MAIS FY 2025 Total Cost Aggregated Items Title: OTHER FLIGHT TRAINING A (44) 1.21) NASMP MH-60R Naval Aircrew Training Systems (NATS) A 1.22) NASMP MH-60S Aircrew Virtual Environment Trainer (AVET) A 1.23) NASMP MH-60R/S TOFT Technology and Simulation Upgrades A 1.24) NASMP - H-60 Cybersecurity and Information Assurance A 1.25) NASMP FA/EA-18 - TOFT Software Gold Disk A 9,834K 4 39.334 - - - - - - - - - - - - - - - 12,816K 3 38.449 - - - - - - - - - - - - - - - - - 8.000 - - 8.000 - - 12.771 - - 11.145 - - - - - 11.145 - - 8.416 - - 2.250 - - 2.294 - - 2.300 - - - - - 2.300 - - 15.791 - - 2.151 - - 2.193 - - 2.236 - - - - - 2.236 (45) (46) Upgrades (47) LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 40 of 43 P-1 Line #59 Volume 3 - 54 === page 105 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD 1.26) NASMP FA/EA-18 Integ Virtual Environ Maint Trnr (IVEMT) Modernization A 1.27) NASMP - FA/ EA-18 Trainer Tech A Refresh (48) 1.28) NASMP CMV-22 Simulator Modernization A (49) 1.29) NASMP - E-2D Weapon System Trainer Tech Refresh A 1.30) NASMP E-2D Avionics Mission Computer A 1.31) NASMP - E-6B OFT/IAT Trainer Modernization A 1.32) NASMP - P-8 A MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($) Qty (Each) Aggregated Items Title: OTHER FLIGHT TRAINING FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) - - 11.453 - - 3.000 - - - - - - - - - - - - - - 22.857 - - 9.477 - - 19.646 - - 8.674 - - - - - 8.674 - - - - - - - - - - - 2.700 - - - - - 2.700 - - 17.827 - - 7.698 - - - - - 2.500 - - - - - 2.500 - - - - - 4.000 - - 5.000 - - - - - - - - - - - 12.733 - - 2.399 - - 2.548 - - - - - - - - - - - 37.000 - - 20.000 - - 23.205 - - 23.600 - - - - - 23.600 - - 8.784 - - 4.519 - - 1.500 - - 1.600 - - - - - 1.600 - - 16.186 - - 5.500 - - 7.500 - - - - - - - - - - - 62.008 - - 3.981 - - - - - - - - - - - - - - 5.154 - - 4.000 - - 4.080 - - 4.000 - - - - - 4.000 - - 4.000 - - 4.000 - - 0.800 - - - - - - - - - - - - - - - - - - - - 7.300 - - - - - 7.300 (50) Tech Refresh (51) 1.33) NASMP MQ-4/8 Unmanned Aerial Vehicle (UAV) Trainer Upgrades A (52) 1.34) NASMP CNATRA - Pilot Part Task Trainer Upgrades A 1.35) NASMP CNATRA - Naval Flt Off (NFO) MCS & T-45 OFT Upgrades A 1.36) NASMP CNATRA - T-6A/ B Aircrew Training Device (ATD) A Upgrades (53) 1.37) NASMP CNATRA NAVOTS Upgrades A 1.38) NASMP - CNATRA Obsolescence Resolution and A LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 41 of 43 P-1 Line #59 Volume 3 - 55 === page 106 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0705 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] Enhancements (Core) ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: OTHER FLIGHT TRAINING FY 2026 Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) (54) 1.39) NASMP - FA/ EA-18 NSF-3 Fidelity Upgrades A 1.40) Prior Year - A Inactive NAVY (55) Subtotal: 1) Hardware 2) Production Engineering (56) 2.1) USMC Federation Simulators A 2.2) NASMP (57) A Subtotal: 2) Production Engineering - - 41.308 - - - - - - - - - - - - - - - - - 486.175 - - - - - - - - - - - - - - - - - 1,745.324 - - 218.588 - - 244.066 - - 230.430 - - - - - 230.430 - - 118.936 - - 11.898 - - 11.097 - - 11.100 - - - - - 11.100 - - 380.666 - - 44.145 - - 39.197 - - 42.200 - - - - - 42.200 - - 499.602 - - 56.043 - - 50.294 - - 53.300 - - - - - 53.300 - - 81.027 - - 8.350 - - 7.938 - - 7.938 - - - - - 7.938 17.400 3) Production Support 3.1) USMC Federation Simulators A 3.2) NASMP A - - 169.356 - - 19.664 - - 17.290 - - 17.400 - - - - - Subtotal: 3) Production Support - - 250.383 - - 28.014 - - 25.228 - - 25.338 - - - - - 25.338 Total - - 2,495.309 - - 302.645 - - 319.588 - - 309.068 - - - - - 309.068 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Footnotes: (33) (34) ADVTE Trainer Modernization: FY 2027 funds will procure network equipment CONUS, update of NECC equipment 2nd & 3rd Marine Air Wings (2nd MAW, 3rd MAW) and TEn v 11 including new hardware. USMC Fed Sim - Marine Common Aircrew Trainer (MCAT) Modernization: FY 2027 will include a modernization that replaces aging Commercial Off The Shelf (COTS) hardware and updates IOS systems where necessary. The FY27 modernization will evolve existing projector technology and replace, where feasible, Mixed Reality capability for the visual presentation picture to the Marine Aircrewman. (35) Marine Common Aircrew Trainer Aviation Maintenance Courseware: FY 2027 continues aviation maintenance courseware based on Training Systems Requirements Analysis to better equip Marine aviation maintainers with necessary skills to repair aircraft at an expeditionary airfield. A Nickel Cadmium courseware will be completed and fielded. (36) USMC Fed Sim - KC-130 Trainer Modernization: FY 2027 contracts are for tech upgrades to replace Commercial Off the Shelf (COTS) hardware, cyber and windows operating system for the fielded KC-130J training devices to include Cockpit Procedures Trainers (CPTs) 1, 2 & 3 systems. (37) USMC Fed Sim - H-1 Trainer Modernization: FY 2027 contracts are for tech upgrades to Commercial Off the Shelf (COTS) hardware and software of four-fielded H-1 Flight Training Devices (FTD). Specifically, AH-1Z & UH-1Y Cockpit Procedures Trainer (CPT)s. (38) MV-22 Containerized Flight Training Device (CFTD) Modernization: Upgrade obsolete components and improve trainer availability (less down time). Over 50% of Aircrew flight training is conducted in the CFTD directly reducing flying hour costs and improving mission readiness of aircraft. FY 2027 awards new 5-year contract with FY27 Base contract and four (4) options years. The MV-22 flight trainer hardware replaces aging Commercial Off the Shelf (COTS) hardware and software to include the latest generation projectors, display mirrors, host computer systems, image eight generators, cockpit displays and control loaders components. (39) USMC Fed Sim - MQ-9 Tech Refresh: FY 2027 contracts are for tech upgrades to replace Commercial Off the Shelf (COTS) hardware, cyber and windows operating systems for the fielded MSAT #1 & #5 Aircrew MJAT Standalone Trainers. (40) VH-92A Aircrew Training Device Modernization: FY2027 contracts for tech refresh/upgrades to Commercial Off The Shelf (COTS) hardware and Windows IOS software for VH-92 Maintenance Training Device (MTD) and Systems Emulation Maintenance Trainer (SEMT). (41) Common Simulation Models Upgrades: FY 2027 procures annual updates to common simulation software and models used by Navy and USMC aviation trainers. Includes release of updated Next Generation Threat System (NGTS), Common Acoustic Simulation Environment (CASE), Common Visual Database and Common Weapon Models and Common Network Standards and Interfaces. LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 42 of 43 P-1 Line #59 Volume 3 - 56 === page 107 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 P-1 Line Item Number / Title: 0705 / Common Ground Equipment Aggregated Items Title: OTHER FLIGHT TRAINING (42) NADTC and Distributed Mission Training Enablers Upgrades: FY 2027 procures ongoing specific software fixes for F/A-18 E/F and E-2D simulators and DMT network improvements. Additional network lines will be deployed to Fleet Sites to connect simulators with distributed networks. (43) FY 2027 continues a multi-year effort to enable Carrier Air Wing (CVW) platform trainers to connect with one another to support secure, cross-T/M/S, integrated training. This allows aircrews across multiple locations to meet the National Defense Strategy priority to build a more lethal force by training to the high-end fight. FY 2027 continues procurement of network upgrades to establish a secure Virtual-Constructive (VC) battlespace necessary to replicate near-peer threats and provide CVW training against advanced adversary systems that cannot be replicated or conducted live due to range and OPSEC limitations. This effort updates H-60 and P-8A ASW trainers to participate in CVW integrated with Strike Platforms. It supports DMT by ensuring threat simulation is common across all mission participants, resolving simulator network discrepancies, addressing platform trainer limitations that prevent repeatable distributed training capability. (44) Integrated Training Facilities (ITF): FY 2027 will procure, integrate, deploy, and test the F35 trainer to ITF Fallon to add F35 Training capability and capacity to the Integrated Training Facility located at Naval Aviation Warfare Center, Fallon NV. FY 2027 continues procurement of software and hardware upgrades and integrates systems into the Integrated Simulation Environment (ISE). The ISE leverages the Joint Simulation Environment (JSE) and includes F-35, E-2D, F/ A-18E/F, EA-18G, and AEGIS training devices for high fidelity training. Integrated Training Facilities includes sites at NAS Fallon, Integrated Training Facilities includes the Naval Air Warfare Development Center (NAWDC) simulator training facilities, the ITF, and Air Wing Training Facility (AWTF). (45) MH-60R/S TOFT Technology and Simulation Upgrades: FY 2027 procures tech upgrades for H-60 training systems Commercial Off the Shelf (COTS) components that are obsolete and unsupportable. A contract will be awarded for a tech refresh to Operational Flight Trainer (OFT) #5 / Weapons Tactical Trainer (WTT) #1, Naval Aircrewman Training System (NATS) #1 and Aircrew Virtual Environment Trainer (AVET)s #2. (46) H-60 Cybersecurity and Information Assurance: FY 2027 procures annual cybersecurity upgrades and patches required to receive and/or maintain Authority to Operate (ATO) and Connect H-60 trainers across the Navy Continuous Training Environment (NCTE) network. (47) FA/EA-18 TOFT Software Gold Disk Upgrades: FY 2027 procures annual cybersecurity upgrades and patches required to receive and/or maintain Authority to Operate and Connect FA/EA-18 trainers across the Navy Continuous Training Environment (NCTE) network. Gold disk software are released quarterly which contain the latest Operational software and necessary Cyber patches. (48) (49) (50) (51) FA/EA-18 Trainer Tech Refresh: FY 2027 continues to procure tech upgrades for F/A-18 training systems, replaces and integrates Commercial off the Shelf (COTS) components that are obsolete and unsupportable. CMV-22 Simulator Modernization: FY 2027 contracts are for tech refresh/upgrades to Commercial Off the Shelf (COTS) hardware and software for Flight Training Device (FTD) #1. E-2D Trainer Tech Refresh: FY2027 contracts are for tech refresh/upgrades to Commercial Off the Shelf (COTS) hardware and software for E-2D Distributed Readiness Trainer (DDRT) 5 & 6. P-8 Tech Refresh: FY 2027 continues tech upgrades to replace obsolescent Commercial off the shelf technology (COTS) on P-8 Operational Flight Trainers (OFT, Weapons Tactic Trainers (WTT) and Deployable Mission Rehearsal Trainers at NAS Jacksonville, FL, and NAS Whidbey Island, WA. (52) MQ-4 Unmanned Aerial Vehicle (UAV) Trainer Upgrades: FY 2027 procures Mission System Trainer (MST) MB-4, MB-7, MB-9 & MB-5; and Multipurpose Reconfigurable Training System Three Dimensional (MRTS 3D) 2A94 & 2A97 for tech upgrades of obsolete Commercial of the Shelf (COTS) components. (53) CNATRA T-6A/B Aircrew Training Device (ATD) Upgrades: FY 2027 continues procurement of hardware and software upgrades to resolve obsolescence issues on 17 T-6 Operational Flight Trainers (OFTs) and 17 T-6 Unit Training Devices (UTDs) used for primary flight training. This funding aligns to USAF/USN joint programs to maintain trainer baselines to enable Pilot and Student Naval Aviator training. (54) CNATRA Obsolescence Resolution and Enhancements (CORE): FY 2027 incorporates a consolidated line item to cover all CNATRA undergraduate flight-training devices. CORE entails procurement of hardware and software upgrades to resolve obsolescence and incorporate enhancements to 350 CNATRA training devices that support Pilot and Naval Flight Officer training for T-6, T-45, T-54, TH-73, Naval Air Vehicle Pilot Training System (NAVPTS), Virtual Mission Training System (VMTS), Multi-Crew Simulator (MCS), and Next-Gen Strike. (55) (56) This line captures prior year costs for cost elements that are no longer funded across the FYDP, and where all deliveries of prior year procurements are complete. Production Engineering includes annualized Navy Working Capital Fund support costs previously broken out under a separate line as Acceptance Test. Consolidation increases Program Office efficiency and better aligns program technical support costs in accordance with DoW Financial Management Regulations (FMR) guidance. (57) FY27 increase due to additional Production Engineering working capital fund support for USN maintenance trainers. LI 0705 - Common Ground Equipment Navy UNCLASSIFIED Page 43 of 43 P-1 Line #59 Volume 3 - 57 === page 108 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 3 - 58 === page 109 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 07: Aircraft Support Equip & Facilities / BSA 0715 / Aircraft Industrial Facilities 1: Aircraft Support Equip & Facilities ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 1,616.824 1,616.824 1,616.824 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 105.634 105.634 105.634 112.513 112.513 112.513 113.513 113.513 113.513 0.000 0.000 0.000 113.513 113.513 113.513 112.429 112.429 112.429 115.642 115.642 115.642 118.292 118.292 118.292 To FY 2031 Complete 120.657 Continuing 120.657 Continuing Continuing 120.657 Total - Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Calibration Equipment Description: The objective of the Metrology/Calibration (METCAL) Program is to maintain required accuracy and consistency in Navy measurements. This ensures the required measurement accuracy of Test and Measurement Systems (TAMS) and Aviation Support Equipment (SE) used to test, repair and maintain Aviation Weapon Systems is adequate. Calibration is an on-cycle maintenance action and can be described as the comparison of a measurement device/system of unverified/unknown accuracy (TAMS or SE) to a device of known and greater accuracy (Calibration Standard). Fleet Readiness Centers (FRC) Support Equipment (SE)/Industrial Equipment Description: The Objective of the FRC SE/Industrial Equipment Investment program is to increase Ready Basic Aircraft (RBA). The purchase of equipment for the Fleet Readiness Centers will increase the agility, capability, and capacity to perform the critical mission of repair, overhaul of aircraft, engines, and components while maintaining the organic industrial capacity to meet current and future requirements. FY 2026 spend plan for FRCSE/Industrial Equipment (FIOP) includes $80,570 thousand of discretionary and $44,000 thousand of mandatory (reconciliation) for a total of $124,570 thousand. FY 2026 discretionary funding supports the procurement industrial equipment, peculiar and common ground support equipment, necessary to support aircraft, engine, and component depot level repairs. The mandatory funds provide advanced technology equipment including cold spray development and digital asset tracking. LI 0715 - Aircraft Industrial Facilities Navy UNCLASSIFIED Page 1 of 7 P-1 Line #60 Volume 3 - 59 === page 110 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 07: Aircraft Support Equip & Facilities / BSA 0715 / Aircraft Industrial Facilities 1: Aircraft Support Equip & Facilities ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Aircraft Industrial Facilities P-5a - / 816.291 - / 31.451 - / 31.943 - / 31.459 - / - - P-40a FRC SE/Industrial Equipment P-5a - / 800.533 - / 74.183 - / 80.570 - / 82.054 - / - - / 82.054 P-40 Total Gross/Weapon System Cost / 1,616.824 - / 105.634 - / 112.513 - / 113.513 / 0.000 - / 113.513 - - / 31.459 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Calibration Equipment: Funds are used to procure Calibration Standards (CALSTDs) and ancillary equipment for Aviation Fleet Intermediate Calibration Activities, Fleet Training Activities, Aviation Navy Calibration Laboratories (NCLs), and the Navy Primary Standards Laboratory (NPSL). CALSTDs procured for Fleet 'I' level use are to replace obsolete and/or irreparable equipment, expand technical measurement capabilities to decrease Depot support costs, reduce out-of-service turn around times, provide enhanced forward deployed geographic support and reduce/control the Naval Air Systems Command (NAVAIR) cost of ownership associated with Calibration. Fleet 'I' level calibration activities support 70% of the total Fleet calibration workload. Maintenance of Fleet calibration capability through this funding results in the release of more expensive Depot level support man-hours for more complex calibration maintenance and calibrations where economy of scale costs dictate single site or geographic calibration center capability. CALSTDs procured for NCLs and the NPSL allow for the automation and improvement of calibration procedures in order to reduce Fleet asset out-of-service and Turn around Time, expand technical calibration capabilities for enhanced in-theater Fleet support, and replace obsolete and high support cost CALSTDs. FRC SE/Industrial Equipment: Funds are used to procure industrial equipment, peculiar and common ground support equipment, necessary to support aircraft, engine, and component depot level repairs. Replacing obsolete and or irreparable equipment, tooling and test equipment. Procuring equipment for modernization, maintenance of equipment along with miscellaneous other production charges in support of production and testing services, at depot facilities. Procuring new types of equipment to modernize and expand technical capabilities to increase throughput. Procuring training aids and fund installation of the equipment to include required environmental enclosures and training equipment; simulators, all in support of aircraft industrial production facilities. LI 0715 - Aircraft Industrial Facilities Navy UNCLASSIFIED Page 2 of 7 P-1 Line #60 Volume 3 - 60 === page 111 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0715 / Aircraft Industrial Facilities Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) Aggregated Items Title: Aircraft Industrial Facilities FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) 1) Aircraft Industrial Facilities 1.1) Automated / Interface CALSTDs A 1.2) Low Frequency A (1)(†) (†) AC/DC CALSTDs 1.3) Other CALSTDs Procurement (†) 1.4) Physical Dimen / (†) A A Optical CALSTDs 1.5) RF / Microwave CALSTDs (†) 1.6) Res / Impedance CALSTDs (†) A A 1.7) Logistics / Engineering Support A 1.8) Production / Acquisition A (2) 9,495.26 1,793 17.025 3,195.49 133 0.425 3,207.41 135 0.433 3,210.14 138 0.443 - - - 3,210.14 138 0.443 28,330.98 5,659 160.325 11,618.89 593 6.890 11,806.72 595 7.025 11,906.94 591 7.037 - - - 11,906.94 591 7.037 14,030.58 1,864 26.153 7,180.33 122 0.876 7,268.29 123 0.894 6,944.44 126 0.875 - - - 6,944.44 126 0.875 64,364.19 3,446 221.799 31,432.23 273 8.581 31,808.66 277 8.811 31,833.33 270 8.595 - - - 31,833.33 270 8.595 29,835.78 5,925 176.777 15,268.43 529 8.077 15,347.17 530 8.134 15,365.95 511 7.852 - - - 15,365.95 511 7.852 22,137.15 2,253 49.875 6,668.39 193 1.287 6,914.44 187 1.293 6,888.29 188 1.295 - - - 6,888.29 188 1.295 - - 75.183 - - 3.707 - - 3.743 - - 3.911 - - - - - 3.911 - - 89.154 - - 1.608 - - 1.610 - - 1.451 - - - - - 1.451 Subtotal: 1) Aircraft Industrial Facilities - - 816.291 - - 31.451 - - 31.943 - - 31.459 - - - - - 31.459 Total - - 816.291 - - 31.451 - - 31.943 - - 31.459 - - - - - 31.459 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) Each Cost Element with a Quantity represents a number of different end items. The Unit Cost is an average cost for all the end items in Cost Elements 1.1 (Automated/Interface CALSTDs), 1.2 (Low Frequency AC/DC CALSTDs), 1.3 (Other CALSTDs Procurement), 1.4 (Physical/Dimen/Optical CALSTDs), 1.5 (RF/Microwave CALSTDs), and 1.6 (Res/Impedance CALSTDs). (2) FY27 funding increase in Instrument Calibration Procedure (ICP) development requirements for two calibration standards planned for procurement in FY27. The ICP's are required to properly support calibration of support equipment for maintenance on P8A, E2D, and C130 aircraft platforms. LI 0715 - Aircraft Industrial Facilities Navy UNCLASSIFIED Page 3 of 7 P-1 Line #60 Volume 3 - 61 === page 112 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Aggregated Items: Aircraft Industrial Facilities FY Contractor and Location Method/Type or Funding Vehicle 2021 Various / Various C / FP Multiple Oct 2020 Oct 2020 128 3,242.19 Y 2022 Various / Various C / FP Multiple Oct 2021 Oct 2021 131 3,229.01 Y 2023 Various / Various C / FP Multiple Oct 2022 Oct 2022 136 3,139.71 Y 2024 Various / Various C / FP Multiple Oct 2023 Oct 2023 133 3,120.30 Y 2025 Various / Various C / FP Multiple Oct 2024 Oct 2024 133 3,195.49 Y 2026 Various / Various C / FP Multiple Oct 2025 Oct 2025 135 3,207.41 Y 2027 Various / Various C / TBD Multiple Oct 2026 Oct 2026 138 3,210.14 Y 1.2) Low Frequency AC/DC CALSTDs 2021 Various / Various C / FP Multiple Oct 2020 Oct 2020 513 10,902.53 Y 1.2) Low Frequency AC/DC CALSTDs 2022 Various / Various C / FP Multiple Oct 2021 Oct 2021 499 11,436.87 Y 1.2) Low Frequency AC/DC CALSTDs 2023 Various / Various C / FP Multiple Oct 2022 Oct 2022 598 11,543.48 Y 1.2) Low Frequency AC/DC CALSTDs 2024 Various / Various C / FP Multiple Oct 2023 Oct 2023 588 11,552.72 Y 1.2) Low Frequency AC/DC CALSTDs 2025 Various / Various C / FP Multiple Oct 2024 Oct 2024 593 11,618.89 Y 1.2) Low Frequency AC/DC CALSTDs 2026 Various / Various C / FP Multiple Oct 2025 Oct 2025 595 11,806.72 Y 1.2) Low Frequency AC/DC CALSTDs 2027 Various / Various C / TBD Multiple Oct 2026 Oct 2026 591 11,906.94 Y 1.3) Other CALSTDs Procurement 2021 Various / Various C / FP Multiple Oct 2020 Oct 2020 129 6,271.32 Y 1.3) Other CALSTDs Procurement 2022 Various / Various C / FP Multiple Oct 2021 Oct 2021 128 6,445.31 Y 1.3) Other CALSTDs Procurement 2023 Various / Various C / FP Multiple Oct 2022 Oct 2022 121 6,950.41 Y 1.3) Other CALSTDs Procurement 2024 Various / Various C / FP Multiple Oct 2023 Oct 2023 115 7,208.70 Y 1.3) Other CALSTDs Procurement 2025 Various / Various C / FP Multiple Oct 2024 Oct 2024 122 7,180.33 Y 1.3) Other CALSTDs Procurement 2026 Various / Various C / FP Multiple Oct 2025 Oct 2025 123 7,268.29 Y 1.3) Other CALSTDs Procurement 2027 Various / Various C / TBD Multiple Oct 2026 Oct 2026 126 6,944.44 Y Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 0715 / Aircraft Industrial Facilities Location of PCO Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date 1) Aircraft Industrial Facilities 1.1) Automated / Interface CALSTDs (1) 1.1) Automated / Interface CALSTDs (1) 1.1) Automated / Interface CALSTDs (1) 1.1) Automated / Interface CALSTDs (1) 1.1) Automated / Interface CALSTDs (1) 1.1) Automated / Interface CALSTDs (1) 1.1) Automated / Interface CALSTDs (1) LI 0715 - Aircraft Industrial Facilities Navy UNCLASSIFIED Page 4 of 7 P-1 Line #60 Volume 3 - 62 === page 113 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Aggregated Items: Aircraft Industrial Facilities FY Contractor and Location Method/Type or Funding Vehicle 1.4) Physical Dimen / Optical CALSTDs 2021 Various / Various C / FP Multiple Oct 2020 Oct 2020 262 31,458.02 Y 1.4) Physical Dimen / Optical CALSTDs 2022 Various / Various C / FP Multiple Oct 2021 Oct 2021 261 31,042.15 Y 1.4) Physical Dimen / Optical CALSTDs 2023 Various / Various C / FP Multiple Oct 2022 Oct 2022 265 31,309.43 Y 1.4) Physical Dimen / Optical CALSTDs 2024 Various / Various C / FP Multiple Oct 2023 Oct 2023 269 31,431.23 Y 1.4) Physical Dimen / Optical CALSTDs 2025 Various / Various C / FP Multiple Oct 2024 Oct 2024 273 31,432.23 Y 1.4) Physical Dimen / Optical CALSTDs 2026 Various / Various C / FP Multiple Oct 2025 Oct 2025 277 31,808.66 Y 1.4) Physical Dimen / Optical CALSTDs 2027 Various / Various C / TBD Multiple Oct 2026 Oct 2026 270 31,833.33 Y 1.5) RF / Microwave CALSTDs 2021 Various / Various C / FP Multiple Oct 2020 Oct 2020 574 13,153.31 Y 1.5) RF / Microwave CALSTDs 2022 Various / Various C / FP Multiple Oct 2021 Oct 2021 513 15,035.09 Y 1.5) RF / Microwave CALSTDs 2023 Various / Various C / FP Multiple Oct 2022 Oct 2022 526 14,880.23 Y 1.5) RF / Microwave CALSTDs 2024 Various / Various C / FP Multiple Oct 2023 Oct 2023 534 14,902.62 Y 1.5) RF / Microwave CALSTDs 2025 Various / Various C / FP Multiple Oct 2024 Oct 2024 529 15,268.43 Y 1.5) RF / Microwave CALSTDs 2026 Various / Various C / FP Multiple Oct 2025 Oct 2025 530 15,347.17 Y 1.5) RF / Microwave CALSTDs 2027 Various / Various C / TBD Multiple Oct 2026 Oct 2026 511 15,365.95 Y 1.6) Res / Impedance CALSTDs 2021 Various / Various C / FP Multiple Oct 2020 Oct 2020 180 7,023.72 Y 1.6) Res / Impedance CALSTDs 2022 Various / Various C / FP Multiple Oct 2021 Oct 2021 186 6,747.31 Y 1.6) Res / Impedance CALSTDs 2023 Various / Various C / FP Multiple Oct 2022 Oct 2022 192 6,692.71 Y 1.6) Res / Impedance CALSTDs 2024 Various / Various C / FP Multiple Oct 2023 Oct 2023 190 6,810.53 Y 1.6) Res / Impedance CALSTDs 2025 Various / Various C / FP Multiple Oct 2024 Oct 2024 193 6,668.39 Y 1.6) Res / Impedance CALSTDs 2026 Various / Various C / FP Multiple Oct 2025 Oct 2025 187 6,914.44 Y 1.6) Res / Impedance CALSTDs 2027 Various / Various C / TBD Multiple Oct 2026 Oct 2026 188 6,888.29 Y Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 0715 / Aircraft Industrial Facilities LI 0715 - Aircraft Industrial Facilities Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 5 of 7 P-1 Line #60 Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date Volume 3 - 63 === page 114 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0715 / Aircraft Industrial Facilities Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: FRC SE/Industrial Equipment Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) FRC group 0204164N 1.1) Divestiture Support A 1.2) Equipment A - - 483.732 - - - - - - - - - - - - - - - 1,547K 154 238.298 1,494K 38 56.762 1,750K 35 61.233 1,748K 36 62.944 - - - 1,748K 36 62.944 - - 54.559 - - 11.456 - - 13.697 - - 13.270 - - - - - 13.270 - - 23.944 - - 5.965 - - 5.640 - - 5.840 - - - - - 5.840 Subtotal: 1) FRC group 0204164N - - 800.533 - - 74.183 - - 80.570 - - 82.054 - - - - - 82.054 Total - - 800.533 - - 74.183 - - 80.570 - - 82.054 - - - - - 82.054 Purchase (3)(†) 1.3) Equipment Installation (4) 1.4) Acquisition Support (5) A A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (3) Each Cost Element with a Quantity represents a number of different end items. The Unit Cost is an estimated average cost for all the end items in the Cost element and are based on historical values pulled from previous years of Capital Investment Program (CIP) procurement of similar types of equipment. FY27 Equipment Purchase costs reflect current Fleet Readiness Center Infrastructure Optimization and Modernization Plan program. Requirement for procurement of a Radome test set in FY27 aligns with budgeted amount. The FY 2026 Equipment Purchase cost element for FRCSE/Industrial Equipment (FIOP) includes $61.233 million of discretionary funding plus $35.200 million of mandatory funds for a total of $96.433 million. The discretionary funding is to procure industrial equipment, peculiar and common ground support equipment, necessary to support aircraft, engine, and component depot level repairs. The mandatory (reconciliation) funding supports the procurement of new advanced technology equipment. The mandatory funds provide advanced technology equipment including cold spray development and digital asset tracking. (4) Installation cost for equipment projects include necessary efforts to facilitate the operational utility of equipment purchases and Naval Facilities Engineering Command support costs. FY27 Equipment Installation costs reflect current Fleet Readiness Center Infrastructure Optimization and Modernization Plan program. Requirement for procurement of a Radome test set in FY27 aligns with budgeted amount. The FY 2026 Equipment Installation cost element for FRCSE/ Industrial Equipment (FIOP) includes $13.697 million of discretionary funding plus $6.800 million of mandatory funds for a total of $20.497 million. The discretionary funding is to install industrial equipment, peculiar and common ground support equipment, necessary to support aircraft, engine, and component depot level repairs. The mandatory (reconciliation) funding is to install new advanced technology equipment. The mandatory funds provide for installation of advanced technology equipment including cold spray development and digital asset tracking. (5) The acquisition support costs are based on estimated average fees for the contracting administration entities, such as Defense Logistics Agency, for their efforts with contract award and procurement administrative functions. Funding will continue to support the replacement of obsolescence or irreparable equipment through the Fleet Infrastructure Optimization Plan (FIOP) efforts while enhancing Fleet Readiness Center (FRC) throughput within the workshop footprint. FY27 Acquisition costs reflect labor requirements at COMFRC, FRCE, FRCSE, and FRCSW for acquisition and organic labor support. The FY 2026 Acquisition Support cost element for FRCSE/Industrial Equipment (FIOP) includes $5.640 million of discretionary funding plus $2.0 million of mandatory funds for a total of $7.640 million. The discretionary funding is for acquisition support related to the procurement and installation of industrial equipment, peculiar and common ground support equipment, necessary to support aircraft, engine, and component depot level repairs. The mandatory (reconciliation) funding is for acquisition support related to the procurement and installation of new advanced technology equipment. The mandatory funds provide for acquisition support related to the procurement and installation of advanced technology equipment including cold spray development and digital asset tracking. LI 0715 - Aircraft Industrial Facilities Navy UNCLASSIFIED Page 6 of 7 P-1 Line #60 Volume 3 - 64 === page 115 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 0715 / Aircraft Industrial Facilities FY Contractor and Location Method/Type or Funding Vehicle Aggregated Items: FRC SE/Industrial Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) FRC group 0204164N 1.2) Equipment Purchase (3) 2020 Various / Various Various Multiple Mar 2020 Mar 2020 17 1,903K Y 1.2) Equipment Purchase (3) 2021 Various / Various Various Multiple Oct 2020 Oct 2020 25 1,405K Y 1.2) Equipment Purchase (3) 2022 Various / Various Various Multiple Oct 2021 Oct 2021 26 1,473K Y 1.2) Equipment Purchase (3) 2023 Various / Various Various Multiple Oct 2022 Oct 2022 35 1,488K Y 1.2) Equipment Purchase (3) 2024 Various / Various Various Multiple Oct 2023 Oct 2023 51 1,577K Y 1.2) Equipment Purchase (3) 2025 Various / Various Various Multiple Oct 2024 Oct 2024 38 1,494K Y 1.2) Equipment Purchase (3) 2026 Various / Various Various Multiple Oct 2025 Oct 2025 35 1,750K Y 1.2) Equipment Purchase (3) 2027 Various / Various Various Multiple Oct 2026 Oct 2026 36 1,748K Y LI 0715 - Aircraft Industrial Facilities Navy UNCLASSIFIED Page 7 of 7 P-1 Line #60 Volume 3 - 65 === page 116 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 3 - 66 === page 117 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 07: Aircraft Support Equip & Facilities / BSA 0720 / War Consumables 1: Aircraft Support Equip & Facilities ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0204164N, 0204161N, 0604329N Other Related Program Elements: 0205633N, 0604659N Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 1,408.007 1,408.007 1,408.007 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 43.604 45.153 56.577 0.000 56.577 86.319 - - - - - - 43.604 45.153 56.577 0.000 56.577 86.319 - - - - - - 43.604 45.153 56.577 0.000 56.577 86.319 119.331 119.331 119.331 153.897 153.897 153.897 To FY 2031 Complete 171.557 Continuing 171.557 171.557 Total - Continuing Continuing Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 2.389 2.491 2.446 - 2.446 2.425 1.077 - - - 10.828 Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The WAR CONSUMABLES P-1 line item has two subcategories: Common Aircraft Armament Equipment (AAE) and Aerial Refueling Stores (ARS). The Common AAE program procures, modifies and upgrades Stores Suspension and Release Equipment (SSRE) which includes common bomb racks, peculiar bomb racks, missile launchers and related support for USN/USMC platforms. The ARS program procures, modifies, and upgrades aerial refueling stores, External Fuel Tanks (EFT) and related support. COMMON AIRCRAFT ARMAMENT EQUIPMENT (AAE) As directed by OPNAVINST 8000.16B (Naval Ordnance Maintenance Management Program (NOMMP)), the appropriation provides for procurement of new AAE to replace attrition losses, provides for production engineering support and satisfies commonality policy goals set forth by the Navy's Strike Warfare Master Plan. Specifically, the following equipment is funded as AAE within the War Consumables budget: - Upgrades, modifications and reliability improvements to common and peculiar bomb rack and associated equipment. - Upgrades, modifications and reliability improvements to various missile launchers and associated equipment that support the following platforms: F/A-18 A-F, EA-18G, AV-8B, AH-1W/Z, UH-1N/Y and MH-60R/ S. - Upgrades, modifications and reliability improvements to Pure Air Generating Systems (PAGS). There are two variants of PAGS, Marotta Pure Air Compression Technology (MPACT)/High Pressure Pure Air Generators (HiPPAG), currently in use as on-board coolant generator for missile launchers carrying infrared (IR) seeking missiles. - The BRU-55 is an upgrade to the BRU-33 CVER (Canted Vertical), with electronic upgrades, which allows for the carriage and release of two MIL-STD-1760 weapons from a single F/A-18 A-F station. The BRU-55 was developed as part of the Mk-82 JDAM program. - A Universal Armament Interface (UAI) Type II interface is required for operation and carriage of the Small Diameter Bomb II (SDB II) weapon on the threshold aircrafts F-35B and F-35C and the objective aircraft F/A-18 E/F for the Department of the Navy (DoN). DoN will be using BRU-55 for carriage on F-18 E/F aircraft and BRU-61 for F-35 B/C to support the SDB II warfighter requirements, Initial Operating Capability (IOC), and schoolhouse requirements. BRU-55 A/A's will be modified to BRU-55 B/A's. - The BRU-61 pneumatic rack is required for carriage of SDB II on F-35 aircraft. The BRU-61 uses the Universal Armament Interface (UAI) software to pass updates from the aircraft to the weapon. - The Modular Common Launcher (MCL) is required for carriage of Precision Attack Strike Munition (PASM) on the AH-1Z aircraft. The MCL provides a platform for future integration of legacy weapons (e.g. Hellfire, JAGM, APKWS and unguided 2.75 in rockets) and emerging weapons (e.g. PASM, expanded APKWS and Air Launched Effects) on the AH-1Z, MH-60, and other platforms. MCL procurements will begin in FY 2029. AERIAL REFUELING STORES (ARS) LI 0720 - War Consumables Navy UNCLASSIFIED Page 1 of 11 P-1 Line #61 Volume 3 - 67 === page 118 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 07: Aircraft Support Equip & Facilities / BSA 0720 / War Consumables 1: Aircraft Support Equip & Facilities ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0204164N, 0204161N, 0604329N Other Related Program Elements: 0205633N, 0604659N Line Item MDAP/MAIS Code: N/A The ARS program finances Aerial Refueling Systems, such as Digital Controller Upgrade (DCU) and Optical Reference System (ORS), EFT and related support equipment. Requirements are determined by an inventory objective, which supports peacetime/wartime needs. Aircraft equipped with the A/A42R-1 Aerial Refueling Stores (ARS) are required for all carrier based tanking missions. Total reliance on the ARS and integration in the F/A-18E/F requires substantial improvements to the existing stores to ensure their viability through 2050. Investigation of major subsystems support the improvement of the ARS to achieve life cycle cost savings, mitigation of flight safety risk and reliability enhancements. The following equipment is funded as ARS within the War Consumables budget: - External Fuel Tanks for F/A-18 (A-D variants), required to meet the Fleet Response plan and replace original equipment due to fatigue issues. - ARS Support Equipment - External Fuel Tank Support Equipment - Provides production support, modification, and modernization of ARS and EFT products. LI 0720 - War Consumables Navy UNCLASSIFIED Page 2 of 11 P-1 Line #61 Volume 3 - 68 === page 119 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 07: Aircraft Support Equip & Facilities / BSA 0720 / War Consumables 1: Aircraft Support Equip & Facilities ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0204164N, 0204161N, 0604329N Other Related Program Elements: 0205633N, 0604659N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a War Consumables P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 1,408.007 - / 43.604 - / 45.153 - / 56.577 - / 1,408.007 - / 43.604 - / 45.153 - / 56.577 - / - - / 56.577 / 0.000 - / 56.577 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The budget increase in FY 2027 accounts for the procurement and recurring engineering costs associated with the new BRU-61 C/A to support F-35B and F-35C. FY 2027 request provides funding to procure, modify and/or upgrade bomb racks, missile launchers, Aerial Refueling Store, and associated support. FY 2027 procurements support the following platforms: F/A-18 A-F, EA-18G, AV-8B, AH-1W/Z, UH-1N/Y, MH-60R/S, F-35B, and F-35C. Fluctuations in funding from year to year are based on the required modifications and upgrades to support multiple aircraft Type/Model/Series. This may also cause the budget line to exceed the OSW standard inflation rate. LI 0720 - War Consumables Navy UNCLASSIFIED Page 3 of 11 P-1 Line #61 Volume 3 - 69 === page 120 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0720 / War Consumables Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] 1) Common AAE ID CD Code Unit Cost ($) Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($) A (2) 1.2) Launcher Upgrade & Installation A (4)(†) A (3) (Each) ($ M) ($) (Each) ($ M) - 4.467 - - 4.388 - - - - - 4.388 - - 114.408 - - 12.213 - - 4.461 - - 4.220 - - - - - 4.220 - - - - - - - 19 16.901 - - - - - - - - - - - - - - - - - - - - 27.286 - - - - 50.319 - - - - 62.604 - - - - 505.969 - - - 880.475 - - - 104.910 - - - - A - A - Subtotal: 2) Aerial Refueling Stores Total 1.5) BRU-61 Recurring Engineering A 1.6) BRU-61 C/A A (6) (7) 1.9) ILS A 1.10) Product Improvement A 1.11) Product A (8) A (9) Subtotal: 1) Common AAE 2) Aerial Refueling Stores (10) 2.1) Aerial Refueling A (11) 2.2) Aerial Refueling Store Upgrades (12) 2.3) Aerial Refueling Store Upgrades B A (13) 2.4) Product Support (14) - - - - - 5.337 889,542.00 19 16.901 - - - - 14.282 - - 14.199 - - - - - 14.199 - - 0.180 - - 0.581 - - - - - 0.581 2.237 - - 2.284 - - 2.192 - - - - - 2.192 2.104 - - 0.923 - - 0.941 - - - - - 0.941 4.752 - - 1.929 - - 1.967 - - - - - 1.967 - - - - - - - - - - - - - - - 29.600 - - 33.863 - - 45.389 - - - - - 45.389 - - 6.035 - - 2.740 - - 2.848 - - - - - 2.848 4.000 - - 4.711 - - 5.264 - - 5.312 - - - - - 5.312 1.250 - - 1.161 - - 1.185 - - 1.019 - - - - - 1.019 - 37.328 - - 2.097 - - 2.101 - - 2.009 - - - - - 2.009 - 380.044 - - - - - - - - - - - - - - - - - 527.532 - - 14.004 - - 11.290 - - 11.188 - - - - - 11.188 - - 1,408.007 - - 43.604 - - 45.153 - - 56.577 - - - - - 56.577 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) ($) Total Cost Qty - - 2.5) Various ($ M) Unit Cost 8.294 - Support (Each) Qty - 10.959 Stores ($) Unit Cost - 28,100.00 B (5)(†) 1.12) Various ($ M) Qty 108.930 - Engineering (Each) Unit Cost FY 2027 Total Total Cost - 390 Containers Qty FY 2027 OOC Total Cost - - 1.3) BRU-55 B/A 1.4) BRU-61 FY 2027 Base Total Cost (1) 1.1) Bomb Rack Mod Kits & Install MAIS FY 2025 Total Cost Aggregated Items Title: War Consumables 889,542.00 6 889,542.00 indicates the presence of a P-5a Footnotes: (1) (2) Fluctuations in funding from year to year are based on the required modifications and upgrades to support multiple aircraft T/M/S. This may also causes the budget line to exceed the OSW standard inflation rate. FY 2027 procurement is to meet Fleet requirements and continuation of efforts, supporting any Bomb Rack ECPs to improve readiness and/or address safety issues. LI 0720 - War Consumables Navy UNCLASSIFIED Page 4 of 11 P-1 Line #61 Volume 3 - 70 === page 121 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 P-1 Line Item Number / Title: 0720 / War Consumables Aggregated Items Title: War Consumables (3) Launcher Upgrade & Installation costs fluctuate year to year due to prioritization of Fleet readiness requirements. FY 2027 procurement reflects Fleet requirements and continuation of efforts, supporting any Launcher ECPs to improve readiness and/or address safety issues. (4) (5) BRU-55 B/A ECP Kits to upgrade fleet BRU-55 A/As. The requirement has decreased to 390 units which meets the inventory objective. BRU-61-unit cost and procurement quantities represent base prices for the BRU-61C/A that is to be procured for F-35B and F-35C. Fluctuations in procurement quantities and unit costs are driven by a unit cost curve in which costs decrease with increased procurement quantities. Realignment of budget from CE 1.4 BRU-61 to new CE 1.5 BRU-61 recurring engineering as required for BRU-61 production contract. FY 2026 and FY 2027 will award as Lot 1 in December 2026. (6) BRU-61 recurring engineering is required for each production lot and includes engineering oversight; acceptance testing; conducting failure modes, effects and criticality analysis (FMECA); and addressing notice of escapes (NOEs). FY26 and FY27 Recurring engineering support the first Lot buy of BRU-61 quantity of 25. (7) (8) BRU-61 Reusable Shipping and Storage Container compatible with shipboard and VERTREP use. Each container will hold one BRU-61 C/A. Funding provided for engineering support, to include but not limited to; engineering investigations, analysis of ECPs, production support, production testing, technical support, quality assurance, Upgrades, modifications and reliability improvements to common and peculiar bomb racks and to various missile launchers and associated equipment. (9) The amount identified against this cost element reflects total prior year funding associated with equipment no longer procured. (10) (11) (12) Fluctuations in funding from year to year are based on the required modifications and upgrades to support multiple aircraft T/M/S. This may also causes the budget line to exceed the OSW standard inflation rate. 2.1 Aerial Refueling Stores: Fluctuations in funding from year to year are based on the required modifications and upgrades to support multiple aircraft T/M/S. 2.2 ARS Upgrades: Efforts include modifications to individual ARS components that will improve performance and readiness. The ARS updates will package new technologies into the existing store that will support both manned and unmanned (automated) aerial refueling from platforms such as the F/A-18 and MQ-25. (13) 2.3 Aerial Refueling Store Upgrades Support: Provides production support of the ARS Upgrades Cost Element (C.E: 2.2). Support Efforts include production qualification, modifications and integration, production test, and associated ARS production upgrade support as required. (14) The amount identified against this cost element reflects total prior year funding associated with equipment no longer procured. LI 0720 - War Consumables Navy UNCLASSIFIED Page 5 of 11 P-1 Line #61 Volume 3 - 71 === page 122 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 0720 / War Consumables FY Contractor and Location Method/Type or Funding Vehicle 2022 Location of PCO Aggregated Items: War Consumables Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date 1) Common AAE 1.3) BRU-55 B/A (†) (4)(†) 1.4) BRU-61 (5)(†) 1.4) BRU-61 (5)(†) L3 Harris / North Amittyville, NY SS / FFP Lakehurst, NJ Jan 2022 Aug 2025 170 26,900.80 Y Apr 2021 2026 (15) Boeing Co. / St. Charles, MO SS / FFP NAVAIR Dec 2026 Mar 2029 6 889,542.00 Y Dec 2023 2027 (16) Boeing Co. / St. Charles, MO SS / FFP NAVAIR Dec 2026 Mar 2029 19 889,542.00 Y Dec 2023 indicates the presence of a P-21 Footnotes: (15) (16) FY 2026 and FY 2027 will award as Lot 1 in December 2026. FY 2026 and FY 2027 will award as Lot 1 in December 2026. LI 0720 - War Consumables Navy UNCLASSIFIED Page 6 of 11 P-1 Line #61 Volume 3 - 72 === page 123 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0720 / War Consumables Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: War Consumables Fiscal Year 2022 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) Common AAE 1.3) BRU-55 B/A (4) Prior Years Deliveries: 220 7 2022 NAVY 1.4) BRU-61 170 0 170 A - - - - - - - - - - - - - - - - - - - - - 170 (5) 8 2026 NAVY 6 0 6 6 8 2027 NAVY 19 0 19 19 O C T LI 0720 - War Consumables Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #61 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 73 === page 124 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0720 / War Consumables Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: War Consumables Fiscal Year 2024 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) Common AAE 1.3) BRU-55 B/A (4) Prior Years Deliveries: 220 7 2022 NAVY 1.4) BRU-61 170 0 170 - - - - - - - - - - - - - - - - - - - - - - 21 24 125 (5) 8 2026 NAVY 6 0 6 6 8 2027 NAVY 19 0 19 19 O C T LI 0720 - War Consumables Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #61 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 74 === page 125 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0720 / War Consumables Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: War Consumables Fiscal Year 2026 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) Common AAE 1.3) BRU-55 B/A (4) Prior Years Deliveries: 220 7 2022 NAVY 1.4) BRU-61 170 45 125 24 24 24 24 24 4 - 1 0 (5) 8 2026 NAVY 6 0 6 A - - - - - - - - - - 6 8 2027 NAVY 19 0 19 A - - - - - - - - - - 19 O C T LI 0720 - War Consumables Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #61 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 75 === page 126 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0720 / War Consumables Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: War Consumables Fiscal Year 2028 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1) Common AAE 1.3) BRU-55 B/A (4) Prior Years Deliveries: 220 7 2022 NAVY 1.4) BRU-61 170 170 0 0 (5) 8 2026 NAVY 6 0 6 - - - - - - - - - - - - - - - - - 6 8 2027 NAVY 19 0 19 - - - - - - - - - - - - - - - - - 6 O C T LI 0720 - War Consumables Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #61 M A R 0 9 A P R 4 M A Y 0 J U N J U L A U G S E P Volume 3 - 76 === page 127 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0720 / War Consumables Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Aggregated Items: War Consumables Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 L3 Harris - North Amittyville, NY 60 180 300 0 12 24 36 0 4 24 28 2 Boeing Co. - St. Charles, MO 20 130 240 0 15 27 42 0 3 27 30 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0720 - War Consumables Navy UNCLASSIFIED Page 11 of 11 P-1 Line #61 Volume 3 - 77 === page 128 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 3 - 78 === page 129 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 07: Aircraft Support Equip & Facilities / BSA 0725 / Other Production Charges 1: Aircraft Support Equip & Facilities ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 340.409 340.409 340.409 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 73.307 70.770 61.970 0.000 61.970 61.493 65.426 64.379 - - - - - - - - 73.307 70.770 61.970 0.000 61.970 61.493 65.426 64.379 - - - - - - - - 73.307 70.770 61.970 0.000 61.970 61.493 65.426 64.379 To FY 2031 Complete 68.215 Continuing - Continuing - 68.215 Continuing - Total - Continuing - - 68.215 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Other Production Charges line provides funds for miscellaneous production support and testing services and instrumentation packages supporting tactical aircrew combat training to include TCTS II subsystems. The budget request supports the following efforts: TACTICAL COMBAT TRAINING SYSTEM (TCTS): The TCTS Increment II (TCTS II) program will procure fixed and transportable range equipment for the Navy to support shore-based aircrew training. TCTS II systems will transmit and track encrypted data from instrumented exercise participants and events, such as, weapons engagements, providing accurate, realistic, and timely feedback. TCTS II builds upon technology developed for existing tactical training range systems. Specifically, Link Inject To Live (LITL) provides constructive training information from ground based stations to live aircraft. Furthermore, F/A-18 Live, Virtual, Constructive (LVC) DRAGON will enhance the Airborne Electronic Attacks (AEA) LVC capability for Growler crews and F/A-18 pilots. TCTS II procurement primarily acquires airborne Participant Subsystems (PS) for F/A-18 and other tactical aircraft. TCTS II procures new PS to include Airborne Subsystem (AS) and Internal Mount (IM) to provide multiple independent levels of security (MILS) encryption capability for Fleet training exercises. The program will also procure Portable Support Equipment Subsystem (PSES). LI 0725 - Other Production Charges Navy UNCLASSIFIED Page 1 of 9 P-1 Line #62 Volume 3 - 79 === page 130 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 07: Aircraft Support Equip & Facilities / BSA 0725 / Other Production Charges 1: Aircraft Support Equip & Facilities ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Other Production Charges P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 340.409 - / 73.307 - / 70.770 - / 61.970 - / 340.409 - / 73.307 - / 70.770 - / 61.970 - / - - / 61.970 / 0.000 - / 61.970 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 request will continue Full Rate Production of Tactical Combat Training System Increment II (TCTS II). TCTS II will procure 28 Participant Subsystems (PS) and 2 Portable Support Equipment Subsystems (PSESs). The FY27 budget includes depot stand-up. LI 0725 - Other Production Charges Navy UNCLASSIFIED Page 2 of 9 P-1 Line #62 Volume 3 - 80 === page 131 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy P-1 Line Item Number / Title: 0725 / Other Production Charges Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Other Production Charges Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 1) Tactical Combat Training System 1.1) Link Inject to Live (LITL) Sustainment 1.2) Participant Subsystem (PS) (1) (2)(†) 1.3) TCTS Inc II Portable Support Equipment Subsystem (PSES) A A - - - - - - - - - - 2.200 - - - - - 2.200 945,505.26 190 179.646 349,131.61 83 28.978 418,735.05 85 35.592 1,142K 28 31.975 - - - 1,142K 28 31.975 520,000.00 8 4.160 488,481.00 5 2.442 483,908.71 12 5.807 546,000.00 2 1.092 - - - 546,000.00 2 1.092 A (3)(†) 1.5) TCTS II Engineering Change Proposal A (4) 1.6) TCTS Increment I Block Upgrade A 1.7) Production A Engineering (5) 1.8) Production Support - A (6) (7) A - - 7.150 - - 3.142 - - 3.853 - - 8.636 - - - - - 8.636 - - 10.666 - - - - - - - - - - - - - - - - - 47.326 - - 7.156 - - 7.461 - - 6.561 - - - - - 6.561 - - 7.753 - - 10.639 - - 11.702 - - 6.120 - - - - - 6.120 - - 83.708 - - 20.950 - - 6.355 - - 5.386 - - - - - 5.386 Subtotal: 1) Tactical Combat Training System - - 340.409 - - 73.307 - - 70.770 - - 61.970 - - - - - 61.970 Total - - 340.409 - - 73.307 - - 70.770 - - 61.970 - - - - - 61.970 1.9) Non Recurring Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) (2) FY27 Provides funding to update cyber compliance, Windows 11 mandate, and increased technical support requirements as well as associated manpower for cyber and field engineering support and government oversight. Participant Subsystem: FY 2027 funds the procurement of 28 Participant Subsystems (PS) to support continued fielding at NAS Lemoore, NAS Oceana, NAS Key West, MCAS Cherry Point, Fleet Area Control and Surveillance Facility (FACSFAC) Dam Neck, Jacksonville Shallow Water Training Range (JSWTR), MCAS Miramar and MCAS Yuma and starts fielding at Pacific Missile Range Facility, Barking Sands (PMRF) and procures the East and West Coast Deployable units. Annual quantities procured are estimated until the follow-on Production contract awards. Unit cost increase reflects the difference between costs from a FFP CLIN negotiated in 2018 to an updated IGCE for the follow-on production contract expected to award in Sept 2026. Unit costs include site specific costs and will vary per range per year. (3) Portable Support Equipment Subsystem (PSES): FY 2027 funds the procurement of 2 complete PSES to support acquisition of the East and West Coast Deployable units. Unit cost increase reflects the difference between costs from a FFP CLIN negotiated in 2018 to an updated IGCE for the follow-on production contract expected to award in Sept 2026. Unit costs include site specific costs and will vary per range per year. Annual quantities procured are estimated until the follow-on Production contract awards. (4) TCTS II Engineering Change Proposal (ECP) funds procurement of critical software and hardware updates to TCTS II Participant Subsystems (PS) and Portable Support Equipment Subsystems (PSES), including updating the NSA Type 1 Encryptor to Cryptomodernization 2.0, to ensure cybersecurity compliance and connectivity with existing range infrastructure in support of connected Live-Virtual-Constructive (LVC) training requirements. (5) (6) Production Engineering: The PE line includes funding for engineering support from NAWCAD PAX and other Department of the Navy organizations that support the TCTS II program in limited capacities. Production Support decrease in FY 2027 is due to SSA costs starting to transition to OMN in FY27. LI 0725 - Other Production Charges Navy UNCLASSIFIED Page 3 of 9 P-1 Line #62 Volume 3 - 81 === page 132 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 P-1 Line Item Number / Title: 0725 / Other Production Charges Aggregated Items Title: Other Production Charges (7) FY 2027 Non-Recurring cost includes funding for Navy Continuous Training Environment (NCTE) Integration (a decrease in cost from FY26) and LVC F/18 Dragon. NAWC China Lake Advanced Weapons Lab (AWL) to complete lab and flight testing to verify and characterize the Dragon Airborne Electronic Attack (AEA) training capability and functionality. The AWL will test and provide discrepancy corrections. AWL will be provide full guidance and technical knowledge to produce the fleet NATIP manual providing instruction to the fleet for the Dragon AEA training system. The AWL will complete verification and validation prior to fleet release. LI 0725 - Other Production Charges Navy UNCLASSIFIED Page 4 of 9 P-1 Line #62 Volume 3 - 82 === page 133 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Item Number / Title [DODIC] O O C P-1 Line Item Number / Title: 0725 / Other Production Charges Aggregated Items: Other Production Charges FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery 2024 Collins Aerospace / Cedar Rapids, IA C / FPIF NAWCTSD Jan 2024 Jul 2025 68 410,764.71 Y Mar 2023 2025 Collins Aerospace / Cedar Rapids, IA C / FPIF NAWCTSD Jan 2025 Jul 2026 83 349,131.61 Y Mar 2024 TBD / TBD C / IDIQ NAWCTSD Sep 2026 Sep 2026 85 418,735.05 Y Apr 2026 2027 TBD / TBD C / IDIQ NAWCTSD Sep 2027 Sep 2027 28 1,142K Y Apr 2027 2024 Collins Aerospace / Cedar Rapids, IA C / FPIF NAWCTSD Dec 2023 Jun 2025 3 468,247.00 Y Mar 2023 2025 Collins Aerospace / Cedar Rapids, IA C / FPIF NAWCTSD Jan 2025 Jul 2026 5 488,481.00 Y Mar 2024 TBD / TBD C / IDIQ NAWCTSD Sep 2026 Mar 2028 12 483,908.71 Y Nov 2025 TBD / TBD C / IDIQ NAWCTSD Sep 2027 Mar 2029 2 546,000.00 Y Nov 2026 Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date 1) Tactical Combat Training System 1.2) Participant Subsystem (PS) (2)(†) 1.2) Participant Subsystem (PS) (2)(†) 1.2) Participant Subsystem (PS) (2)(†) 1.2) Participant Subsystem (PS) (2)(†) 1.3) TCTS Inc II Portable Support Equipment Subsystem (PSES) (3)(†) 1.3) TCTS Inc II Portable Support Equipment Subsystem (PSES) (3)(†) 1.3) TCTS Inc II Portable Support Equipment Subsystem (PSES) (3)(†) 1.3) TCTS Inc II Portable Support Equipment Subsystem (PSES) (†) (3)(†) 2026 2026 (8) (9) 2027 indicates the presence of a P-21 Footnotes: (8) (9) Until follow-on production contract award estimated Sept 2026, vendor is TBD. Until follow-on production contract award estimated Sept 2026, vendor is TBD. LI 0725 - Other Production Charges Navy UNCLASSIFIED Page 5 of 9 P-1 Line #62 Volume 3 - 83 === page 134 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0725 / Other Production Charges Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Other Production Charges Fiscal Year 2024 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) Tactical Combat Training System 1.2) Participant Subsystem (PS) (2) Prior Years Deliveries: 122 9 2024 NAVY 68 0 68 9 2025 NAVY 83 0 83 10 2026 NAVY 85 0 85 10 2027 NAVY 28 0 28 A - - - - - - - - - - - - - - - - - - A - - - - - - 5 5 - 5 - - 53 83 85 28 1.3) TCTS Inc II Portable Support Equipment Subsystem (PSES) (3) Prior Years Deliveries: 5 11 2024 NAVY 3 0 3 11 2025 NAVY 5 0 5 12 2026 NAVY 12 0 12 12 2027 NAVY 2 0 2 A - - - - - - - - - - - - - - - - - A - - - - - 1 1 - 1 - 0 - - 5 12 2 O C T LI 0725 - Other Production Charges Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 9 S E P O C T N O V D E C J A N F E B P-1 Line #62 M A R A P R M A Y J U N J U L A U G S E P Volume 3 - 84 === page 135 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0725 / Other Production Charges Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Other Production Charges Fiscal Year 2026 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1) Tactical Combat Training System 1.2) Participant Subsystem (PS) (2) Prior Years Deliveries: 122 9 2024 NAVY 68 15 53 9 2025 NAVY 83 0 83 10 2026 NAVY 85 0 85 10 2027 NAVY 28 0 28 5 5 - 5 - 5 - 5 - 5 - 6 - 6 - 11 - 0 - 12 12 12 12 12 12 11 A8 7 7 7 7 0 7 7 7 7 7 7 7 0 A1 1.3) TCTS Inc II Portable Support Equipment Subsystem (PSES) 27 (3) Prior Years Deliveries: 5 11 2024 NAVY 3 3 0 11 2025 NAVY 5 0 5 12 2026 NAVY 12 0 12 12 2027 NAVY 2 0 2 0 - - - - - - - - 1 1 1 1 A O C T LI 0725 - Other Production Charges Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 9 S E P 1 O C T 0 N O V D E C J A N F E B P-1 Line #62 M A R A P R M A Y J U N J U L A U G - 12 A - 2 S E P Volume 3 - 85 === page 136 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0725 / Other Production Charges Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Items (Units in Each) O O C M F R # FY SERVICE Aggregated Items: Other Production Charges Fiscal Year 2028 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1) Tactical Combat Training System 1.2) Participant Subsystem (PS) (2) Prior Years Deliveries: 122 9 2024 NAVY 68 68 0 0 9 2025 NAVY 83 83 0 0 10 2026 NAVY 85 85 0 10 2027 NAVY 28 1 27 0 2 1.3) TCTS Inc II Portable Support Equipment Subsystem (PSES) 2 2 3 3 3 3 3 3 3 0 (3) Prior Years Deliveries: 5 11 2024 NAVY 3 3 0 11 2025 NAVY 5 5 0 0 12 2026 NAVY 12 0 12 - - - - - 12 2027 NAVY 2 0 2 - - - - - 0 O C T LI 0725 - Other Production Charges Navy N O V D E C J A N F E B 1 1 M A R 1 A P R 1 M A Y 1 J U N 1 J U L A U G UNCLASSIFIED Page 8 of 9 1 1 S E P 1 O C T 1 N O V 1 D E C 1 J A N 0 F E B P-1 Line #62 1 M A R 1 A P R 0 M A Y J U N J U L A U G S E P Volume 3 - 86 === page 137 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0725 / Other Production Charges Appropriation / Budget Activity / Budget Sub Activity: 1506N / 07 / 1 Aggregated Items: Other Production Charges Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 22 156 180 1 Collins Aerospace - Cedar Rapids, IA 2 TBD - TBD 3 Collins Aerospace - Cedar Rapids, IA 4 TBD - TBD TBD 1 3 16 TBD ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 5 7 13 20 5 3 18 21 0 0 0 0 0 0 0 0 5 7 18 25 5 3 18 21 0 0 0 0 0 0 0 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0725 - Other Production Charges Navy UNCLASSIFIED Page 9 of 9 P-1 Line #62 Volume 3 - 87 === page 138 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 3 - 88 === page 139 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 07: Aircraft Support Equip & Facilities / BSA 0735 / Special Support Equipment 1: Aircraft Support Equip & Facilities ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 2,921.274 2,921.274 2,921.274 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 396.543 396.543 396.543 117.962 117.962 117.962 218.318 218.318 218.318 0.000 0.000 0.000 218.318 218.318 218.318 370.357 370.357 370.357 405.802 405.802 405.802 418.798 418.798 418.798 To FY 2031 Complete 426.978 Continuing 426.978 426.978 Total - Continuing Continuing Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Details of this P-1 item are classified. Justification: The details of this budget exhibit are classified, per Executive Order 13526, Sec 1.4(a) and are submitted annually to Congress in the classified budget justification book. LI 0735 - Special Support Equipment Navy UNCLASSIFIED Page 1 of 1 P-1 Line #63 Volume 3 - 89 === page 140 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 3 - 90 === page 141 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 07: Aircraft Support Equip & Facilities / BSA 0790 / Cancelled Account Adjustments 1: Aircraft Support Equip & Facilities ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - - 0.000 0.477 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 0.477 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Total - - - - - - - - - - - - 0.000 0.477 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 0.477 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) To FY 2031 Complete - - - - - - - - - - - - 0.000 0.477 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 0.477 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This line finances cancelled account adjustments. LI 0790 - Cancelled Account Adjustments Navy UNCLASSIFIED Page 1 of 1 P-1 Line #64 Volume 3 - 91 === page 142 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 3 - 92