=== page 1 === UNCLASSIFIED Department of War Fiscal Year (FY) 2027 Budget Estimates April 2026 Navy Justification Book Volume 1 of 3 Aircraft Procurement, Navy Budget Activities 01−04 UNCLASSIFIED === page 2 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED === page 3 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Table of Volumes Budget Activities 01-04.....................................................................................................................................................Volume 1 Budget Activity 05............................................................................................................................................................. Volume 2 Budget Activities 06-07.....................................................................................................................................................Volume 3 UNCLASSIFIED Volume 1 - i === page 4 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - ii === page 5 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Volume 1 Table of Contents Cost of Report............................................................................................................................................................. Volume 1 - v Introduction and Explanation of Contents..............................................................................................................Volume 1 - vii Comptroller Exhibit P-1..............................................................................................................................................Volume 1 - ix Master Line Item Table of Contents (by Appropriation then Line Number).................................................... Volume 1 - xxxiii Master Line Item Table of Contents (Alphabetically by Line Item Title)..........................................................Volume 1 - xxxix Line Item Table of Contents (by Appropriation then Line Number)................................................................... Volume 1 - xliii Line Item Table of Contents (Alphabetically by Line Item Title).......................................................................... Volume 1 - xlv Executive Summary................................................................................................................................................Volume 1 - xlvii Exhibit P-40s................................................................................................................................................................ Volume 1 - 1 UNCLASSIFIED Volume 1 - iii === page 6 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - iv === page 7 === APN 1-4 APN 5 APN 6-7 The estimated cost of this report for the Department of the Navy (DON) is $68,465. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. The estimated cost of this report for the Department of the Navy (DON) is $130,360. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. The estimated cost of this report for the Department of the Navy (DON) is $12,149. The estimated total cost for supporting the DON budget justification material is approximately $3,188,286 during the 2026 fiscal year. This includes $207,573 in supplies and $2,980,713 in labor. Volume 1 - v === page 8 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - vi === page 9 === Department of Defense Appropriations Act, 2027 Aircraft Procurement, Navy For construction, procurement, production, modification, and modernization of aircraft, equipment, including ordnance, spare parts, and accessories therefore; specialized equipment; expansion of public and private plants, including the land necessary therefore, and such lands and interests therein, may be acquired, and construction prosecuted thereon prior to approval of title; and procurement and installation of equipment, appliances, and machine tools in public and private plants; reserve plant and Government and contractor-owned equipment layaway, $26,947,023,000 to remain available for obligation until September 30, 2029. Volume 1 - vii === page 10 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - viii === page 11 === UNCLASSIFIED Department of War FY 2027 President's Budget Exhibit P-1 Total Obligational Authority DoW Component Summary (Dollars in Thousands) FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total Appropriation Summary FY 2025 Actuals Aircraft Procurement, Navy 15,914,495 17,239,853 509,000 17,748,853 Total Department of the Navy 15,914,495 17,239,853 509,000 17,748,853 Grand Total Department of War 15,914,495 17,239,853 509,000 17,748,853 UNCLASSIFIED Volume 1 - ix === page 12 === UNCLASSIFIED Department of War FY 2027 President's Budget Exhibit P-1 Total Obligational Authority DoW Component Summary (Dollars in Thousands) Appropriation Summary Aircraft Procurement, Navy FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total 26,947,023 7,453,730 34,400,753 Total Department of the Navy 26,947,023 7,453,730 34,400,753 Grand Total Department of War 26,947,023 7,453,730 34,400,753 UNCLASSIFIED Volume 1 - x === page 13 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority Navy Summary (Dollars in Thousands) FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total Appropriation Summary FY 2025 Actuals Aircraft Procurement, Navy 15,914,495 17,239,853 509,000 17,748,853 15,914,495 17,239,853 509,000 17,748,853 Total Department of the Navy UNCLASSIFIED Volume 1 - xi === page 14 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority Navy Summary (Dollars in Thousands) Appropriation Summary Aircraft Procurement, Navy Total Department of the Navy FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total 26,947,023 7,453,730 34,400,753 26,947,023 7,453,730 34,400,753 UNCLASSIFIED Volume 1 - xii === page 15 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Budget Activity Summary (Dollars in Thousands) Appropriation: Aircraft Procurement, Navy FY 2025 Actuals FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total Budget Activity 01. Combat aircraft 7,444,613 03. Trainer aircraft 301,303 04. Other aircraft 522,713 1,116,707 245,000 1,361,707 05. Modification of aircraft 4,328,019 4,730,405 180,000 4,910,405 06. Aircraft spares and repair parts 2,125,592 2,782,627 07. Aircraft support equipment and facilities 1,192,255 930,959 84,000 1,014,959 15,914,495 17,239,853 509,000 17,748,853 Total Aircraft Procurement, Navy UNCLASSIFIED 7,679,155 7,679,155 2,782,627 Volume 1 - xiii === page 16 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Budget Activity Summary (Dollars in Thousands) Appropriation: Aircraft Procurement, Navy FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total Budget Activity 01. Combat aircraft 12,168,296 5,861,940 18,030,236 04. Other aircraft 2,881,450 1,190,000 4,071,450 05. Modification of aircraft 6,269,342 162,000 6,431,342 06. Aircraft spares and repair parts 4,511,417 239,790 4,751,207 07. Aircraft support equipment and facilities 1,116,518 03. Trainer aircraft Total Aircraft Procurement, Navy 26,947,023 UNCLASSIFIED 1,116,518 7,453,730 34,400,753 Volume 1 - xiv === page 17 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2025 Actuals Ident Code Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost Budget Activity 01: Combat aircraft Combat Aircraft 1 F/A-18E/F (Fighter) Hornet A U 2 Joint Strike Fighter CV A U 28,554 17 Less: Advance Procurement (PY) 3 (2,473,555) 29,506 12 (2,096,525) 29,506 12 (2,096,525) (-158,296) (-175,601) (-175,601) 2,315,259 1,920,924 1,920,924 196,634 401,596 401,596 C (FY 2026 for FY 2027) (M) (355,423) (355,423) C (FY 2026 for FY 2028) (M) (46,173) (46,173) Joint Strike Fighter CV Advance Procurement (CY) C (FY 2025 for FY 2026) (M) (175,601) C (FY 2025 for FY 2027) (M) (21,033) C (FY 2027 for FY 2028) (M) C (FY 2027 for FY 2029) (M) 4 JSF STOVL Less: Advance Procurement (PY) U 13 (2,130,050) 11 (1,940,880) 11 (1,940,880) (-158,363) (-153,567) (-153,567) 1,971,687 1,787,313 1,787,313 UNCLASSIFIED Volume 1 - xv === page 18 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Budget Activity 01: Combat aircraft Combat Aircraft 1 F/A-18E/F (Fighter) Hornet A U 2 Joint Strike Fighter CV A U Less: Advance Procurement (PY) 49,088 8 (1,372,163) 49,088 29 37 (-376,456) (5,298,723) (-376,456) 995,707 3 (3,926,560) 3,926,560 4,922,267 Joint Strike Fighter CV Advance Procurement (CY) 651,081 651,081 C (FY 2027 for FY 2028) (M) (598,797) (598,797) C (FY 2027 for FY 2029) (M) (52,284) (52,284) C (FY 2025 for FY 2026) (M) C (FY 2025 for FY 2027) (M) C (FY 2026 for FY 2027) (M) C (FY 2026 for FY 2028) (M) 4 JSF STOVL Less: Advance Procurement (PY) U (180,848) 10 (1,935,380) (-118,485) 62,363 UNCLASSIFIED 10 (2,116,228) (-118,485) 1,935,380 1,997,743 Volume 1 - xvi === page 19 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature 5 FY 2025 Actuals Ident Code Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost JSF STOVL Advance Procurement (CY) 169,389 113,744 113,744 C (FY 2026 for FY 2027) (M) (102,663) (102,663) C (FY 2026 for FY 2028) (M) (11,081) (11,081) C (FY 2025 for FY 2026) (M) (153,567) C (FY 2025 for FY 2027) (M) (15,822) C (FY 2027 for FY 2028) (M) C (FY 2027 for FY 2029) (M) 6 CH-53K (Heavy Lift) Less: Advance Procurement (PY) 7 A U 18 (2,611,848) 14 (2,268,610) 14 (2,268,610) (-418,191) (-347,822) (-347,822) 2,193,657 1,920,788 1,920,788 422,971 335,352 335,352 C (FY 2026 for FY 2027) (M) (332,498) (332,498) C (FY 2026 for FY 2028) (M) (1,591) (1,591) C (FY 2026 for FY 2029) (M) (1,263) (1,263) CH-53K (Heavy Lift) Advance Procurement (CY) C (FY 2025 for FY 2026) (M) (347,822) C (FY 2025 for FY 2027) (M) (21,653) C (FY 2025 for FY 2028) (M) (25,474) C (FY 2025 for FY 2029) (M) (28,022) UNCLASSIFIED Volume 1 - xvii === page 20 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature 5 FY 2027 Discretionary Request Ident Code Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost JSF STOVL Advance Procurement (CY) 77,963 77,963 C (FY 2027 for FY 2028) (M) (62,278) (62,278) C (FY 2027 for FY 2029) (M) (15,685) (15,685) C (FY 2025 for FY 2026) (M) C (FY 2025 for FY 2027) (M) C (FY 2026 for FY 2027) (M) C (FY 2026 for FY 2028) (M) 6 CH-53K (Heavy Lift) Less: Advance Procurement (PY) 7 A U 22 (3,398,601) 22 (3,398,601) (-354,151) (-354,151) 3,044,450 3,044,450 429,295 429,295 CH-53K (Heavy Lift) Advance Procurement (CY) C (FY 2025 for FY 2026) (M) C (FY 2025 for FY 2027) (M) C (FY 2025 for FY 2028) (M) C (FY 2025 for FY 2029) (M) C (FY 2026 for FY 2027) (M) C (FY 2026 for FY 2028) (M) C (FY 2026 for FY 2029) (M) UNCLASSIFIED Volume 1 - xviii === page 21 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2025 Actuals Ident Code Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost C (FY 2027 for FY 2028) (M) 8 V-22 (Medium Lift) U 30,118 47,196 47,196 9 H-1 Upgrades (UH-1Y/AH-1Z) A U 8,701 8,305 8,305 10 P-8A Poseidon A U 12,424 13,631 13,631 11 E-2D Adv Hawkeye A U 95,219 12 E-2D Adv Hawkeye 3 1,100,800 3 1,100,800 Advance Procurement (CY) C (FY 2027 for FY 2028) (M) C (FY 2027 for FY 2029) (M) Total Combat aircraft 7,444,613 7,679,155 7,679,155 Budget Activity 03: Trainer aircraft Trainer Aircraft 14 Multi-Engine Training System (METS) Total Trainer aircraft A U 27 301,303 301,303 UNCLASSIFIED Volume 1 - xix === page 22 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec Qty Cost C (FY 2027 for FY 2028) (M) FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost (429,295) (429,295) 5,974 5,974 8 V-22 (Medium Lift) U 9 H-1 Upgrades (UH-1Y/AH-1Z) A U 10 P-8A Poseidon A U 12 4,227,350 12 4,227,350 11 E-2D Adv Hawkeye A U 6 2,075,025 6 2,075,025 12 E-2D Adv Hawkeye Advance Procurement (CY) C (FY 2027 for FY 2028) (M) C (FY 2027 for FY 2029) (M) 550,000 550,000 (300,000) (300,000) (250,000) Total Combat aircraft 12,168,296 (250,000) 5,861,940 18,030,236 Budget Activity 03: Trainer aircraft Trainer Aircraft 14 Multi-Engine Training System (METS) A U Total Trainer aircraft UNCLASSIFIED Volume 1 - xx === page 23 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2025 Actuals Ident Code Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost Budget Activity 04: Other aircraft Other Aircraft 15 KC-130J A U 16 MQ-4 Triton A U 17 MQ-25 A U Less: Advance Procurement (PY) 2 294,406 4 159,226 (61,979) 1 145,000 5 123,839 3 663,017 123,839 (387,686) (100,000) 387,686 100,000 3 (487,686) (-11,979) 50,000 18 518,017 487,686 MQ-25 Advance Procurement (CY) C (FY 2026 for FY 2027) (M) 52,191 52,191 (52,191) (52,191) 15,162 15,162 C (FY 2027 for FY 2028) (M) 19 Marine Group 5 UAS 20 Other Support Aircraft A Total Other aircraft U 19,081 U 1 522,713 19,812 1,116,707 1 245,000 19,812 1,361,707 Budget Activity 05: Modification of aircraft UNCLASSIFIED Volume 1 - xxi === page 24 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Budget Activity 04: Other aircraft Other Aircraft 15 KC-130J A U 16 MQ-4 Triton A U 17 MQ-25 A U 11 7 1,190,000 18 104,326 3 Less: Advance Procurement (PY) 18 1,601,906 2,791,906 104,326 (823,368) 3 (823,368) (-52,191) (-52,191) 771,177 771,177 80,965 80,965 (80,965) (80,965) MQ-25 Advance Procurement (CY) C (FY 2026 for FY 2027) (M) C (FY 2027 for FY 2028) (M) 19 Marine Group 5 UAS 20 Other Support Aircraft A Total Other aircraft U 5 U 10 118,600 5 204,476 2,881,450 10 1,190,000 118,600 204,476 4,071,450 Budget Activity 05: Modification of aircraft UNCLASSIFIED Volume 1 - xxii === page 25 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2025 Actuals Ident Code Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost Modification of Aircraft 21 F-18 A-D Unique A U 80,301 53,809 53,809 22 F-18E/F and EA-18G Modernization and Sustainm A U 483,823 576,229 576,229 23 Marine Group 5 UAS Series A U 112,672 137,318 137,318 24 AEA Systems U 17,107 25,848 25,848 25 AV-8 Series A U 3,582 26 Infrared Search and Track (IRST) A U 146,876 175,351 175,351 27 Adversary A U 49,724 21,535 21,535 28 F-18 Series A U 637,867 756,967 756,967 29 H-53 Series A U 94,946 63,227 63,227 30 MH-60 Series A U 97,197 100,093 100,093 UNCLASSIFIED Volume 1 - xxiii === page 26 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Modification of Aircraft 21 F-18 A-D Unique A U 36,951 36,951 22 F-18E/F and EA-18G Modernization and Sustainm A U 563,832 563,832 23 Marine Group 5 UAS Series A U 179,603 179,603 24 AEA Systems U 37,125 37,125 25 AV-8 Series A U 26 Infrared Search and Track (IRST) A U 171,345 171,345 27 Adversary A U 24,732 24,732 28 F-18 Series A U 858,716 858,716 29 H-53 Series A U 91,903 91,903 30 MH-60 Series A U 236,555 236,555 UNCLASSIFIED Volume 1 - xxiv === page 27 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals Ident Code Sec Qty Cost Qty Cost Qty Cost FY 2026 Total Qty 31 H-1 Series A U 155,461 149,405 32 E-2 Series A U 134,974 132,700 132,700 33 Trainer A/C Series A U 12,415 12,151 12,151 34 C-130 Series A U 158,753 144,017 144,017 35 FEWSG A U 663 5 5 36 Cargo/Transport A/C Series A U 13,162 7,526 7,526 37 E-6 Series A U 126,727 163,737 163,737 38 Executive Helicopters Series A U 69,495 66,645 66,645 39 T-45 Series A U 148,967 173,433 173,433 40 Power Plant Changes A U 20,167 18,707 18,707 41 JPATS Series A U 24,157 21,330 21,330 UNCLASSIFIED 20,000 Cost 169,405 Volume 1 - xxv === page 28 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 31 H-1 Series A U 304,267 304,267 32 E-2 Series A U 96,428 96,428 33 Trainer A/C Series A U 12,359 12,359 34 C-130 Series A U 185,266 185,266 35 FEWSG A U 36 Cargo/Transport A/C Series A U 20,100 20,100 37 E-6 Series A U 270,832 270,832 38 Executive Helicopters Series A U 57,319 57,319 39 T-45 Series A U 191,139 191,139 40 Power Plant Changes A U 23,765 23,765 41 JPATS Series A U 28,059 28,059 UNCLASSIFIED Volume 1 - xxvi === page 29 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2025 Actuals Ident Code Sec Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost 42 Aviation Life Support Mods A U 3,964 43 Common ECM Equipment A U 49,354 88,553 88,553 44 Common Avionics Changes A U 139,072 161,376 161,376 45 Common Defensive Weapon System A U 10,687 8,926 8,926 46 ID Systems A U 7,020 3,011 3,011 47 P-8 Series U 302,875 316,632 316,632 48 MAGTF EW for Aviation A U 25,597 22,356 22,356 49 V-22 (Tilt/Rotor B U 264,954 314,145 50 Next Generation Jammer (NGJ) A U 444,761 428,686 428,686 51 F-35 STOVL Series A U 229,843 241,051 241,051 52 F-35 CV Series A U 154,235 140,280 140,280 53 QRC A U 26,957 24,893 24,893 ACFT) Osprey UNCLASSIFIED 160,000 474,145 Volume 1 - xxvii === page 30 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 42 Aviation Life Support Mods A U 43 Common ECM Equipment A U 365,990 365,990 44 Common Avionics Changes A U 246,728 246,728 45 Common Defensive Weapon System A U 11,028 11,028 46 ID Systems A U 3,199 3,199 47 P-8 Series U 381,014 381,014 48 MAGTF EW for Aviation A U 20,686 20,686 49 V-22 (Tilt/Rotor B U 641,715 641,715 50 Next Generation Jammer (NGJ) A U 458,658 458,658 51 F-35 STOVL Series A U 428,881 81,000 509,881 52 F-35 CV Series A U 135,612 81,000 216,612 53 QRC A U 27,686 ACFT) Osprey UNCLASSIFIED 27,686 Volume 1 - xxviii === page 31 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals Ident Code Sec Qty Cost Qty 54 MQ-4 Series A U 79,913 55 DON Other 3 (TTNT) A U -37 56 DON Other 4 (TTNT) A U -21 57 DON Other 6 (TTNT) A U -191 Total Modification of aircraft Cost Qty Cost 180,463 FY 2026 Total Qty Cost 180,463 4,328,019 4,730,405 180,000 4,910,405 2,125,592 2,782,627 2,782,627 2,125,592 2,782,627 2,782,627 572,690 584,561 584,561 Budget Activity 06: Aircraft spares and repair parts Aircraft Spares and Repair Parts 58 Spares and Repair Parts A U Total Aircraft spares and repair parts Budget Activity 07: Aircraft support equipment and facilities Aircraft Support Equip & Facilities 59 Common Ground Equipment A U UNCLASSIFIED Volume 1 - xxix === page 32 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec 54 MQ-4 Series A U 55 DON Other 3 (TTNT) A U 56 DON Other 4 (TTNT) A U 57 DON Other 6 (TTNT) A U Qty Total Modification of aircraft Cost FY 2027 Mandatory Request Qty Cost 157,849 FY 2027 Total Qty Cost 157,849 6,269,342 162,000 6,431,342 4,511,417 239,790 4,751,207 4,511,417 239,790 4,751,207 Budget Activity 06: Aircraft spares and repair parts Aircraft Spares and Repair Parts 58 Spares and Repair Parts A U Total Aircraft spares and repair parts Budget Activity 07: Aircraft support equipment and facilities Aircraft Support Equip & Facilities 59 Common Ground Equipment A U 666,140 UNCLASSIFIED 666,140 Volume 1 - xxx === page 33 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals Ident Code Sec Qty Cost Qty Cost Qty Cost FY 2026 Total Qty 44,000 Cost 60 Aircraft Industrial Facilities A U 105,634 112,513 156,513 61 War Consumables A U 43,604 45,153 45,153 62 Other Production Charges A U 73,307 70,770 70,770 63 Special Support Equipment A U 396,543 117,962 40,000 157,962 64 Cancelled Account Adjustments A U 477 Total Aircraft support equipment and facilities 1,192,255 930,959 84,000 1,014,959 Total Aircraft Procurement, Navy 15,914,495 17,239,853 509,000 17,748,853 UNCLASSIFIED Volume 1 - xxxi === page 34 === UNCLASSIFIED Department of the Navy FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 1506N Detail (Dollars in Thousands) Appropriation: 1506 Aircraft Procurement, Navy Line No Item Nomenclature FY 2027 Discretionary Request Ident Code Sec Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 60 Aircraft Industrial Facilities A U 113,513 113,513 61 War Consumables A U 56,577 56,577 62 Other Production Charges A U 61,970 61,970 63 Special Support Equipment A U 218,318 218,318 64 Cancelled Account Adjustments A U Total Aircraft support equipment and facilities 1,116,518 1,116,518 Total Aircraft Procurement, Navy 26,947,023 UNCLASSIFIED 7,453,730 34,400,753 Volume 1 - xxxii === page 35 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Master Line Item Table of Contents (by Appropriation then Line Number) Appropriation 1506N: Aircraft Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 1 01 01 0145 FA-18E/F................................................................................................................................................ Volume 1 - 1 2 01 01 0147 Joint Strike Fighter CV.........................................................................................................................Volume 1 - 11 3 01 01 0147 Joint Strike Fighter CV, Advance Procurement................................................................................... Volume 1 - 39 4 01 01 0152 JSF STOVL.......................................................................................................................................... Volume 1 - 47 5 01 01 0152 JSF STOVL, Advance Procurement.................................................................................................... Volume 1 - 63 6 01 01 0158 CH-53K (Heavy Lift).............................................................................................................................Volume 1 - 69 7 01 01 0158 CH-53K (Heavy Lift), Advance Procurement....................................................................................... Volume 1 - 85 8 01 01 0164 V-22 (Medium Lift)............................................................................................................................... Volume 1 - 99 9 01 01 0178 UH-1Y/AH-1Z..................................................................................................................................... Volume 1 - 117 10 01 01 0193 P-8A Poseidon................................................................................................................................... Volume 1 - 123 11 01 01 0195 E-2D AHE.......................................................................................................................................... Volume 1 - 137 12 01 01 0195 E-2D AHE, Advance Procurement.....................................................................................................Volume 1 - 151 UNCLASSIFIED Volume 1 - xxxiii === page 36 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1506N: Aircraft Procurement, Navy Line # BA BSA Line Item Number Line Item Title 14 03 01 Multi-Engine Training System (METS)...............................................................................................Volume 1 - 155 0343 Page Appropriation 1506N: Aircraft Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 15 04 01 0416 KC-130J............................................................................................................................................. Volume 1 - 163 16 04 01 0442 MQ-4 TRITON....................................................................................................................................Volume 1 - 179 17 04 01 0449 MQ-25................................................................................................................................................ Volume 1 - 189 18 04 01 0449 MQ-25, Advance Procurement.......................................................................................................... Volume 1 - 203 19 04 01 0452 Marine Group 5 UAS......................................................................................................................... Volume 1 - 207 20 04 01 0465 Other Support Aircraft........................................................................................................................ Volume 1 - 215 UNCLASSIFIED Volume 1 - xxxiv === page 37 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1506N: Aircraft Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 21 05 01 0502 F-18 A-D Unique....................................................................................................................................Volume 2 - 1 22 05 01 0505 F-18E/F and EA-18G Modernization and Sustainment....................................................................... Volume 2 - 19 23 05 01 0507 Marine Group 5 UAS Series................................................................................................................Volume 2 - 55 24 05 01 0513 AEA Systems....................................................................................................................................... Volume 2 - 81 25 05 01 0514 AV-8 Series.......................................................................................................................................... Volume 2 - 89 26 05 01 0515 Infrared Search and Track (IRST)....................................................................................................... Volume 2 - 97 27 05 01 0522 Adversary........................................................................................................................................... Volume 2 - 101 28 05 01 0525 F-18 Series........................................................................................................................................ Volume 2 - 139 29 05 01 0528 H-53 Series........................................................................................................................................ Volume 2 - 211 30 05 01 0530 MH-60 Series..................................................................................................................................... Volume 2 - 241 31 05 01 0532 H-1 Series.......................................................................................................................................... Volume 2 - 279 32 05 01 0544 E-2 Series.......................................................................................................................................... Volume 2 - 311 33 05 01 0549 Trainer Acft Series............................................................................................................................. Volume 2 - 353 34 05 01 0560 C-130 Series...................................................................................................................................... Volume 2 - 377 35 05 01 0561 Flt Elect Wrfr Supt Grp (FEWSG)......................................................................................................Volume 2 - 409 36 05 01 0562 Cargo/Transport Acft Series.............................................................................................................. Volume 2 - 415 UNCLASSIFIED Volume 1 - xxxv === page 38 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1506N: Aircraft Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 37 05 01 0564 E-6 Series.......................................................................................................................................... Volume 2 - 433 38 05 01 0566 Executive Helicopters Series............................................................................................................. Volume 2 - 487 39 05 01 0569 T-45 Series........................................................................................................................................ Volume 2 - 503 40 05 01 0570 Power Plant Changes........................................................................................................................ Volume 2 - 545 41 05 01 0571 JT Primary Acft Trnr Sys (JPATS).....................................................................................................Volume 2 - 551 42 05 01 0575 Aviation Life Support Mods................................................................................................................Volume 2 - 571 43 05 01 0576 Common ECM Equipment................................................................................................................. Volume 2 - 579 44 05 01 0577 Common Avionics Changes...............................................................................................................Volume 2 - 597 45 05 01 0581 Common Defensive Weapon System................................................................................................ Volume 2 - 637 46 05 01 0582 ID Sys................................................................................................................................................ Volume 2 - 645 47 05 01 0586 P-8 Series.......................................................................................................................................... Volume 2 - 653 48 05 01 0587 MAGTF EW for Aviation.................................................................................................................... Volume 2 - 669 49 05 01 0590 V-22 (Tilt/Rotor Acft) Osprey............................................................................................................. Volume 2 - 677 50 05 01 0591 Next Generation Jammer (NGJ)........................................................................................................ Volume 2 - 737 51 05 01 0592 F-35 STOVL Series........................................................................................................................... Volume 2 - 745 52 05 01 0593 F-35 CV Series.................................................................................................................................. Volume 2 - 783 53 05 01 0595 QRC................................................................................................................................................... Volume 2 - 823 54 05 01 0596 MQ-4 Series....................................................................................................................................... Volume 2 - 825 UNCLASSIFIED Volume 1 - xxxvi === page 39 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1506N: Aircraft Procurement, Navy Line # BA BSA Line Item Number Line Item Title 58 06 01 Spares and Repair Parts....................................................................................................................... Volume 3 - 1 0605 Page Appropriation 1506N: Aircraft Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 59 07 01 0705 Common Ground Equipment............................................................................................................... Volume 3 - 15 60 07 01 0715 Aircraft Industrial Facilities................................................................................................................... Volume 3 - 59 61 07 01 0720 War Consumables................................................................................................................................Volume 3 - 67 62 07 01 0725 Other Production Charges................................................................................................................... Volume 3 - 79 63 07 01 0735 Special Support Equipment................................................................................................................. Volume 3 - 89 64 07 01 0790 Cancelled Account Adjustments.......................................................................................................... Volume 3 - 91 UNCLASSIFIED Volume 1 - xxxvii === page 40 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - xxxviii === page 41 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Master Line Item Table of Contents (Alphabetically by Line Item Title) Line Item Title Line Item Number Line # BA BSA Page AEA Systems 0513 24 05 01..................... Volume 2 - 81 AV-8 Series 0514 25 05 01..................... Volume 2 - 89 Adversary 0522 27 05 01................... Volume 2 - 101 Aircraft Industrial Facilities 0715 60 07 01..................... Volume 3 - 59 Aviation Life Support Mods 0575 42 05 01................... Volume 2 - 571 C-130 Series 0560 34 05 01................... Volume 2 - 377 CH-53K (Heavy Lift) 0158 6 01 01..................... Volume 1 - 69 CH-53K (Heavy Lift), Advance Procurement 0158 7 01 01..................... Volume 1 - 85 Cancelled Account Adjustments 0790 64 07 01..................... Volume 3 - 91 Cargo/Transport Acft Series 0562 36 05 01................... Volume 2 - 415 Common Avionics Changes 0577 44 05 01................... Volume 2 - 597 Common Defensive Weapon System 0581 45 05 01................... Volume 2 - 637 Common ECM Equipment 0576 43 05 01................... Volume 2 - 579 Common Ground Equipment 0705 59 07 01..................... Volume 3 - 15 E-2 Series 0544 32 05 01................... Volume 2 - 311 E-2D AHE 0195 11 01 01................... Volume 1 - 137 E-2D AHE, Advance Procurement 0195 12 01 01................... Volume 1 - 151 UNCLASSIFIED Volume 1 - xxxix === page 42 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page E-6 Series 0564 37 05 01................... Volume 2 - 433 Executive Helicopters Series 0566 38 05 01................... Volume 2 - 487 F-18 A-D Unique 0502 21 05 01....................... Volume 2 - 1 F-18 Series 0525 28 05 01................... Volume 2 - 139 F-18E/F and EA-18G Modernization and Sustainment 0505 22 05 01..................... Volume 2 - 19 F-35 CV Series 0593 52 05 01................... Volume 2 - 783 F-35 STOVL Series 0592 51 05 01................... Volume 2 - 745 FA-18E/F 0145 1 01 01....................... Volume 1 - 1 Flt Elect Wrfr Supt Grp (FEWSG) 0561 35 05 01................... Volume 2 - 409 H-1 Series 0532 31 05 01................... Volume 2 - 279 H-53 Series 0528 29 05 01................... Volume 2 - 211 ID Sys 0582 46 05 01................... Volume 2 - 645 Infrared Search and Track (IRST) 0515 26 05 01..................... Volume 2 - 97 JSF STOVL 0152 4 01 01..................... Volume 1 - 47 JSF STOVL, Advance Procurement 0152 5 01 01..................... Volume 1 - 63 JT Primary Acft Trnr Sys (JPATS) 0571 41 05 01................... Volume 2 - 551 Joint Strike Fighter CV 0147 2 01 01..................... Volume 1 - 11 Joint Strike Fighter CV, Advance Procurement 0147 3 01 01..................... Volume 1 - 39 KC-130J 0416 15 04 01................... Volume 1 - 163 MAGTF EW for Aviation 0587 48 05 01................... Volume 2 - 669 UNCLASSIFIED Volume 1 - xl === page 43 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page MH-60 Series 0530 30 05 01................... Volume 2 - 241 MQ-25 0449 17 04 01................... Volume 1 - 189 MQ-25, Advance Procurement 0449 18 04 01................... Volume 1 - 203 MQ-4 Series 0596 54 05 01................... Volume 2 - 825 MQ-4 TRITON 0442 16 04 01................... Volume 1 - 179 Marine Group 5 UAS 0452 19 04 01................... Volume 1 - 207 Marine Group 5 UAS Series 0507 23 05 01..................... Volume 2 - 55 Multi-Engine Training System (METS) 0343 14 03 01................... Volume 1 - 155 Next Generation Jammer (NGJ) 0591 50 05 01................... Volume 2 - 737 Other Production Charges 0725 62 07 01..................... Volume 3 - 79 Other Support Aircraft 0465 20 04 01................... Volume 1 - 215 P-8 Series 0586 47 05 01................... Volume 2 - 653 P-8A Poseidon 0193 10 01 01................... Volume 1 - 123 Power Plant Changes 0570 40 05 01................... Volume 2 - 545 QRC 0595 53 05 01................... Volume 2 - 823 Spares and Repair Parts 0605 58 06 01....................... Volume 3 - 1 Special Support Equipment 0735 63 07 01..................... Volume 3 - 89 T-45 Series 0569 39 05 01................... Volume 2 - 503 Trainer Acft Series 0549 33 05 01................... Volume 2 - 353 UH-1Y/AH-1Z 0178 9 01 01................... Volume 1 - 117 UNCLASSIFIED Volume 1 - xli === page 44 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page V-22 (Medium Lift) 0164 8 01 01..................... Volume 1 - 99 V-22 (Tilt/Rotor Acft) Osprey 0590 49 05 01................... Volume 2 - 677 War Consumables 0720 61 07 01..................... Volume 3 - 67 UNCLASSIFIED Volume 1 - xlii === page 45 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (by Appropriation then Line Number) Appropriation 1506N: Aircraft Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 1 01 01 0145 FA-18E/F................................................................................................................................................ Volume 1 - 1 2 01 01 0147 Joint Strike Fighter CV.........................................................................................................................Volume 1 - 11 3 01 01 0147 Joint Strike Fighter CV, Advance Procurement................................................................................... Volume 1 - 39 4 01 01 0152 JSF STOVL.......................................................................................................................................... Volume 1 - 47 5 01 01 0152 JSF STOVL, Advance Procurement.................................................................................................... Volume 1 - 63 6 01 01 0158 CH-53K (Heavy Lift).............................................................................................................................Volume 1 - 69 7 01 01 0158 CH-53K (Heavy Lift), Advance Procurement....................................................................................... Volume 1 - 85 8 01 01 0164 V-22 (Medium Lift)............................................................................................................................... Volume 1 - 99 9 01 01 0178 UH-1Y/AH-1Z..................................................................................................................................... Volume 1 - 117 10 01 01 0193 P-8A Poseidon................................................................................................................................... Volume 1 - 123 11 01 01 0195 E-2D AHE.......................................................................................................................................... Volume 1 - 137 12 01 01 0195 E-2D AHE, Advance Procurement.....................................................................................................Volume 1 - 151 UNCLASSIFIED Volume 1 - xliii === page 46 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Appropriation 1506N: Aircraft Procurement, Navy Line # BA BSA Line Item Number Line Item Title 14 03 01 Multi-Engine Training System (METS)...............................................................................................Volume 1 - 155 0343 Page Appropriation 1506N: Aircraft Procurement, Navy Line # BA BSA Line Item Number Line Item Title Page 15 04 01 0416 KC-130J............................................................................................................................................. Volume 1 - 163 16 04 01 0442 MQ-4 TRITON....................................................................................................................................Volume 1 - 179 17 04 01 0449 MQ-25................................................................................................................................................ Volume 1 - 189 18 04 01 0449 MQ-25, Advance Procurement.......................................................................................................... Volume 1 - 203 19 04 01 0452 Marine Group 5 UAS......................................................................................................................... Volume 1 - 207 20 04 01 0465 Other Support Aircraft........................................................................................................................ Volume 1 - 215 UNCLASSIFIED Volume 1 - xliv === page 47 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (Alphabetically by Line Item Title) Line Item Title Line Item Number Line # BA BSA Page CH-53K (Heavy Lift) 0158 6 01 01..................... Volume 1 - 69 CH-53K (Heavy Lift), Advance Procurement 0158 7 01 01..................... Volume 1 - 85 E-2D AHE 0195 11 01 01................... Volume 1 - 137 E-2D AHE, Advance Procurement 0195 12 01 01................... Volume 1 - 151 FA-18E/F 0145 1 01 01....................... Volume 1 - 1 JSF STOVL 0152 4 01 01..................... Volume 1 - 47 JSF STOVL, Advance Procurement 0152 5 01 01..................... Volume 1 - 63 Joint Strike Fighter CV 0147 2 01 01..................... Volume 1 - 11 Joint Strike Fighter CV, Advance Procurement 0147 3 01 01..................... Volume 1 - 39 KC-130J 0416 15 04 01................... Volume 1 - 163 MQ-25 0449 17 04 01................... Volume 1 - 189 MQ-25, Advance Procurement 0449 18 04 01................... Volume 1 - 203 MQ-4 TRITON 0442 16 04 01................... Volume 1 - 179 Marine Group 5 UAS 0452 19 04 01................... Volume 1 - 207 Multi-Engine Training System (METS) 0343 14 03 01................... Volume 1 - 155 Other Support Aircraft 0465 20 04 01................... Volume 1 - 215 P-8A Poseidon 0193 10 01 01................... Volume 1 - 123 UNCLASSIFIED Volume 1 - xlv === page 48 === UNCLASSIFIED Navy • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page UH-1Y/AH-1Z 0178 9 01 01................... Volume 1 - 117 V-22 (Medium Lift) 0164 8 01 01..................... Volume 1 - 99 UNCLASSIFIED Volume 1 - xlvi === page 49 === Executive Summary for Aircraft Procurement, Navy Table 1: FundingOverview FY 2026 ($K) FY 2027 ($K) FY 2025 ($K) Discretionary $ 15,914,495 $ 17,239,853 $ 26,947,023 Mandatory $ 509,000 $ $ 7,453,730 $ 15,914,495 $ 17,748,853 $ 34,400,753 Total BLI 0147 0152 0416 0449 0532 0590 0592 0593 0605 0715 0735 Table 2: Funding Overview FY 2026 ($K) FY 2025 ($K) Reconciliation Bin Title $ Air Superiority $ Air Superiority $ Air Superiority 145,000 $ 100,000 Air Superiority Readiness $ 20,000 $ 160,000 Air Superiority $ Air Superiority $ Air Superiority $ Air Superiority $ 44,000 Munitions & Supply Chain $ 40,000 Air Superiority $ $ 509,000 Mandatory Total FY 2027 ($K) $ 3,926,560 $ 1,935,380 $ 1,190,000 $ $ $ $ 81,000 $ 81,000 $ 239,790 $ $ $ 7,453,730 Volume 1 - xlvii === page 50 === MANDATORY FUNDING JUSTIFICATION: The FY 2027 request for Aircraft Procurement, Navy includes $26,947,023 thousand of discretionary and $7,453,730 thousand of mandatory for a total of $34,400,753 thousand. The mandatory funds support: Joint Strike Fighter (JSF) Carrier Variant (CV): The mandatory funds provide for the procurement of 29 F-35Cs, non-recurring flyaway, and support efforts. JSF Short Takeoff and Vertical Landing (STOVL): The mandatory funds provide for the procurement of 10 F-35B, non-recurring flyaway, and support efforts. KC-130J: The mandatory funds provide for the procurement of seven KC-130J aircraft, non-recurring flyaway, and support efforts. F-35 STOVL Series: The mandatory funds provide Block 4 modification and retrofit products. F-35 CV Series: The mandatory funds provide for Correction of Deficiency and Block 4 modification and retrofit products. Spares and Repair Parts: The mandatory funds support critical procurement and sustainment for the F-35 program. The funding is essential for acquiring long-lead items, including initial engine spares, site activation hardware, and depot spares for Lot 20 aircraft. This investment continues to support Global Sustainment Support (GSS) Reset initiatives aimed at enhancing F-35 readiness by improving parts availability, reducing resupply times, and boosting maintenance efficiency. The FY 2026 spend plan for Aircraft Procurement, Navy includes $17,239,853 thousand of discretionary and $509,000 thousand of mandatory for a total of $17,748,853 thousand. Volume 1 - xlviii === page 51 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 0145 / FA-18E/F Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat Aircraft ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0204136N, 0604269N, 0305207N, 0604270N, 0204154N Line Item MDAP/MAIS Code: 000 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 695 54,286.453 54,286.453 54,286.453 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 695 28.554 29.506 49.088 0.000 49.088 58.256 25.469 0.411 0.419 - 54,478.156 - - - - - - - - - - 28.554 29.506 49.088 0.000 49.088 58.256 25.469 0.411 0.419 - - - - - - - - - - - 28.554 29.506 49.088 0.000 49.088 58.256 25.469 0.411 0.419 - Total 54,478.156 54,478.156 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 0.788 1.651 1.479 - 1.479 - - - - - 3.918 Flyaway Unit Cost ($ in Thousands) 67,211.524 - - - - - - - - - - - 67,480.370 Gross/Weapon System Unit Cost ($ in Thousands) 78,110.004 - - - - - - - - - - 78,385.836 Description: The F/A-18E/F Naval Strike Fighter is a twin-engine, mid-wing, multi-mission tactical aircraft. F/A-18E/F can be missionized through selected use of external equipment to accomplish specific fighter or attack missions. This capability allows the Operational Commander more flexibility in employing his tactical aircraft in a dynamic scenario. The primary design mission for the F/A-18E/F is a strike fighter which includes the traditional applications, such as fighter escort and fleet air defense, combined with the attack applications, such as interdiction and close air support. Since the same airframe systems are used on attack missions as well as fighter missions, excellent fighter and self defense capability is retained. LI 0145 - FA-18E/F Navy UNCLASSIFIED Page 1 of 10 P-1 Line #1 Volume 1 - 1 === page 52 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 0145 / FA-18E/F Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat Aircraft ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0204136N, 0604269N, 0305207N, 0604270N, 0204154N Line Item MDAP/MAIS Code: 000 Exhibits Schedule Exhibit Type Title* P-5 1 / 0145 F/A-18 E/F MYP P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 695 / 54,286.453 - / 28.554 - / 29.506 - / 49.088 - / 0.000 - / 49.088 695 / 54,286.453 - / 28.554 - / 29.506 - / 49.088 - / 0.000 - / 49.088 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 request is for Production Engineering Support, and Integrated Logistics Support for government production-related operations support through delivery of the final Lot 47/FY2023 aircraft. FY 2027 Production Line Shutdown funds costs associated with Aircraft Contractor Furnished Equipment (CFE), Government Furnished Equipment/Government Furnished Property (GFE/GFP) which includes planning and administration of the physical disposition of tools and equipment, data transition, supplier close-out, government and contractor labor. FY 2023 is the last year of procurement of the E/F aircraft. Last aircraft delivery of LOT 47 currently scheduled for October 2027. LI 0145 - FA-18E/F Navy UNCLASSIFIED Page 2 of 10 P-1 Line #1 Volume 1 - 2 === page 53 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0145 / FA-18E/F Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / 0145 F/A-18 E/F MYP MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 28.554 29.506 49.088 0.000 49.088 695 Gross/Weapon System Cost ($ in Millions) 54,286.453 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 54,286.453 Plus CY Advance Procurement ($ in Millions) - - - - - 28.554 29.506 49.088 0.000 49.088 - Total Obligation Authority ($ in Millions) 54,286.453 FY 2027 Total - - - - - 28.554 29.506 49.088 0.000 49.088 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) 0.788 1.651 1.479 - 1.479 - - - - - 78,110.004 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost 1.1.1) Airframe/CFE (†) 41,185.524 695 28,623.939 - - - - - - - - - - - - - - - 1.1.2) CFE Electronics 6,164.502 695 4,284.329 - - - - - - - - - - - - - - - 1.1.3) GFE Electronics 1,845.614 695 1,282.702 - - - - - - - - - - - - - - - 4,128.855 1,396 5,763.882 - - - - - - - - - - - - - - - 1.1.5) Armament 278.586 695 193.617 - - - - - - - - - - - - - - - 1.1.6) Other GFE 547.296 695 380.371 - - - - - - - - - - - - - - - 1.1.7) Rec Flyaway ECO 682.422 1.1.4) Engines/Eng Acc (†) 695 474.283 - - - - - - - - - - - - - - - - - 41,003.123 - - - - - - - - - - - - - - - 1.2.1) Non-Recur Cost - - 1,724.494 - - - - - - - - - - - - - - - 1.2.2) Ancillary Equip - - 3,956.094 - - - - - - - - - - - - - - - - - 28.298 - - 25.626 - - 28.432 - - 48.235 - - - - - 48.235 - - 5,708.886 - - 25.626 - - 28.432 - - 48.235 - - - - - 48.235 - - 46,712.009 - - 25.626 - - 28.432 - - 48.235 - - - - - 48.235 2.1) Airframe PGSE - - 422.267 - - - - - - - - - - - - - - - 2.2) Engine PGSE - - 148.623 - - - - - - - - - - - - - - - Subtotal: Recurring Cost Non Recurring Cost 1.2.3) Production Line Shutdown (1) Subtotal: Non Recurring Cost Subtotal: Flyaway Cost Support Cost LI 0145 - FA-18E/F Navy UNCLASSIFIED Page 3 of 10 P-1 Line #1 Volume 1 - 3 === page 54 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0145 / FA-18E/F Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / 0145 F/A-18 E/F MYP MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) 2.3) Avionics PGSE - - 450.071 - - - - - - - - - - - - - - - 2.4) Pec Trng Eq - - 841.117 - - - - - - - - - - - - - - - 2.5) Pub/Tech Eq - - 408.995 - - - - - - - - - - - - - - - - - 3,158.818 - - 2.237 - - 0.364 - - 0.257 - - - - - 0.257 - - 2,144.553 - - 0.691 - - 0.710 - - 0.596 - - - - - 0.596 - - 7,574.444 - - 2.928 - - 1.074 - - 0.853 - - - - - 0.853 695 54,286.453 - - 28.554 - - 29.506 - - 49.088 - - 0.000 - - 49.088 2.6) Prod Eng Supt 2.7) Other ILS (2) (3) Subtotal: Support Cost Gross/Weapon System Cost (†) 78,110.004 indicates the presence of a P-5a Footnotes: (1) FY2027 Production Line Shutdown funds costs associated with Aircraft Contractor Furnished Equipment (CFE), and Government Furnished Equipment/Government Furnished Property (GFE/GFP) include planning and administration of the physical disposition of tools and equipment, data transition, supplier close-out, and government and contractor labor. (2) (3) FY 2027 Production Engineering Support funds government production-related engineering operations and support through final delivery of Lot 47 aircraft in FY 2028. FY2027 Integrated Logistics Support funds government production-related logistics operations and support through final delivery of Lot 47 aircraft in FY 2028. LI 0145 - FA-18E/F Navy UNCLASSIFIED Page 4 of 10 P-1 Line #1 Volume 1 - 4 === page 55 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (†) 1.1.1) Airframe/CFE (†) FY 2022 (4) 2023 (5) Contractor and Location Method/Type or Funding Vehicle Boeing Co. / St. Louis, MO Item Number / Title [DODIC]: 1 / 0145 F/A-18 E/F MYP Location of PCO Award Date Date of First Delivery SS / FPIF NAVAIR Aug 2024 Sep 2026 Specs Date Unit Cost Avail Revision Now? Available ($ K) RFP Issue Date 10 79,589.400 Y Aug 2022 Qty (Each) Boeing Co. / St. Louis, MO SS / FPIF NAVAIR Aug 2024 May 2027 7 73,058.089 Y Jan 2023 1.1.4) Engines/Eng Acc (†) 2022 General Electric Company / Lynn, MA SS / FPIF NAVAIR Jun 2022 May 2024 24 4,705.221 Y Dec 2019 1.1.4) Engines/Eng Acc (†) 2023 General Electric Company / Lynn, MA SS / FPIF NAVAIR Jul 2023 Dec 2024 16 4,993.990 Y Feb 2023 1.1.1) Airframe/CFE (†) O O C P-1 Line Item Number / Title: 0145 / FA-18E/F indicates the presence of a P-21 Footnotes: (4) (5) The Contracts labor union strike that occurred in CY25 has driven a 5 Month delay in final aircraft deliveries from November 2026 to April 2027 The Contracts labor union strike that occurred in CY25 has driven a 6 Month delay in final aircraft deliveries from April 2027 to October 2027 LI 0145 - FA-18E/F Navy UNCLASSIFIED Page 5 of 10 P-1 Line #1 Volume 1 - 5 === page 56 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0145 / FA-18E/F Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / 0145 F/A-18 E/F MYP Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) Airframe/CFE Prior Years Deliveries: 678 1 2022 NAVY 1 2023 NAVY 10 (6) 0 10 10 7 (7) 0 7 7 1.1.4) Engines/Eng Acc Prior Years Deliveries: 1356 2 2022 NAVY 24 0 24 2 2023 NAVY 16 0 16 A O C T LI 0145 - FA-18E/F Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R A P R M A Y J U N - - - 24 A - - - 16 J U L A U G S E P Volume 1 - 6 === page 57 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0145 / FA-18E/F Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / 0145 F/A-18 E/F MYP Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N Calendar Year 2025 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) Airframe/CFE Prior Years Deliveries: 678 1 2022 NAVY 1 2023 NAVY 10 (6) 0 10 A - - - - - - - - - - - - - - 10 7 (7) 0 7 A - - - - - - - - - - - - - - 7 1.1.4) Engines/Eng Acc Prior Years Deliveries: 1356 2 2022 NAVY 24 0 24 - - - - - - - 2 2023 NAVY 16 0 16 - - - - - - - O C T LI 0145 - FA-18E/F Navy N O V D E C J A N F E B M A R A P R 3 5 M A Y 4 J U N 4 J U L A U G UNCLASSIFIED Page 7 of 10 4 - 2 S E P 2 O C T 0 N O V 2 D E C 2 J A N 2 F E B P-1 Line #1 2 M A R 2 A P R 2 M A Y 2 J U N 2 J U L 0 A U G S E P Volume 1 - 7 === page 58 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0145 / FA-18E/F Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / 0145 F/A-18 E/F MYP Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) Airframe/CFE Prior Years Deliveries: 678 1 2022 NAVY 1 2023 NAVY 10 (6) 0 10 - - - - - - - - - - - 7 (7) 0 7 - - - - - - - - - - - 1 2 - 1 - 1 - 1 - 1 - 2 - 1 - 0 - 1 2 1 1 1 1 1.1.4) Engines/Eng Acc Prior Years Deliveries: 1356 2 2022 NAVY 24 24 0 2 2023 NAVY 16 16 0 0 0 O C T LI 0145 - FA-18E/F Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 8 === page 59 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0145 / FA-18E/F Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / 0145 F/A-18 E/F MYP Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.1.1) Airframe/CFE Prior Years Deliveries: 678 1 2022 NAVY 1 2023 NAVY 10 (6) 10 0 7 (7) 6 1 0 1 0 1.1.4) Engines/Eng Acc Prior Years Deliveries: 1356 2 2022 NAVY 24 24 0 2 2023 NAVY 16 16 0 0 0 O C T LI 0145 - FA-18E/F Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 9 === page 60 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0145 / FA-18E/F Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Item Number / Title [DODIC]: 1 / 0145 F/A-18 E/F MYP Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Boeing Co. - St. Louis, MO 24 48 72 0 3 28 31 0 0 0 0 2 General Electric Company Lynn, MA 48 120 144 0 3 12 15 0 0 0 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (6) (7) The Contracts labor union strike that occurred in CY25 has driven a 5 Month delay in final aircraft deliveries from November 2026 to April 2027 The Contracts labor union strike that occurred in CY25 has driven a 6 Month delay in final aircraft deliveries from April 2027 to October 2027 LI 0145 - FA-18E/F Navy UNCLASSIFIED Page 10 of 10 P-1 Line #1 Volume 1 - 10 === page 61 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat Aircraft ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: 0204146N Other Related Program Elements: 0204146M Line Item MDAP/MAIS Code: 198 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Prior Years FY 2027 Base FY 2027 OOC FY 2025 FY 2026 196 17 12 8 35,514.726 2,473.555 2,096.525 1,372.163 FY 2027 Total To FY 2031 Complete FY 2028 FY 2029 FY 2030 8 33 30 31 31 55 413 0.000 1,372.163 4,941.886 4,496.767 4,375.966 4,325.713 14,341.085 73,938.386 - Total Less PY Advance Procurement ($ in Millions) 2,845.765 158.296 175.601 376.456 - 376.456 644.970 594.385 622.556 627.782 1,652.821 7,698.632 Net Procurement (P-1) ($ in Millions) 32,668.961 2,315.259 1,920.924 995.707 0.000 995.707 4,296.916 3,902.382 3,753.410 3,697.931 12,688.264 66,239.754 Plus CY Advance Procurement ($ in Millions) 3,004.061 196.634 401.596 651.081 - 651.081 596.362 622.914 644.113 779.950 801.921 7,698.632 Total Obligation Authority ($ in Millions) 35,673.022 2,511.893 2,322.520 1,646.788 0.000 1,646.788 4,893.278 4,525.296 4,397.523 4,477.881 13,490.185 73,938.386 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 114.910 202.029 520.056 - 520.056 430.029 573.584 384.247 276.190 Continuing Continuing Flyaway Unit Cost ($ in Thousands) 156,348.398 - 120,292.235 136,138.583 132,084.125 - 132,084.125 128,160.242 130,979.733 130,147.290 130,894.645 213,876.927 153,495.886 Gross/Weapon System Unit Cost ($ in Thousands) 181,197.582 145,503.235 174,710.417 171,520.375 - 171,520.375 149,754.121 149,892.233 141,160.194 139,539.129 260,747.000 179,027.569 Description: Joint Strike Fighter (JSF) program will enhance and field a family of aircraft that meets the needs of DoW and allies with three air vehicle aircraft variants including: the F-35A Conventional Take Off and Landing (CTOL) variant, the F-35B Short Take-Off and Vertical Landing (STOVL) variant, and the F-35C Carrier Variant (CV) delivering commonality among the three variants to minimize life cycle costs. This is a joint program with no executive service. Service Acquisition Executive (SAE) authority alternates between the Department of the Navy (DON) and the Department of the Air Force (DAF) and currently resides with the DAF. The F-35s are the next generation of strike fighters and provide increased aero-performance, stealth signature and countermeasures. Its advanced avionics, data links and adverse weather precision targeting incorporates the latest technology available. The F-35 has increased range with internal fuel and can employ superior weaponry over existing aircraft. The highly supportable, affordable, state of the art aircraft commands and maintains global air superiority. The production cost and quantities are interdependent due to sole source air vehicle and propulsion contracts. DAF regular procurement commenced in FY07, DON regular procurement commenced in FY08. For the Marine Corps, this is a Commandant of the Marine Corps (CMC) Force Design program. The F-35C provides critical flexibility and operational maneuverability operating from conventional aircraft carriers or land bases. The Marine Corps currently has two F-35C operational squadrons and will stand up another two squadrons across the FYDP. Notes: (1) FY 2010 and prior quantity and funding for F-35B and F-35C were reported under same Budget Line Item (BLI) 0147. Result is 29 F-35B aircraft (6 - FY08; 7 - FY09; and 16 - FY10) are included in the BLI 0147 budget. The F-35C Program of Record is 413 and is reported as 413 in BLI 0147 due to the combination of this PY calculation and in conjunction with 29 F-35C a/c funded with PB27 mandatory funding. Additionally, Prior to FY 2022, 43 F-35C USMC were accounted in F-35C USN. Therefore, the F-35C USN Program of Record is 273 but reported as 327 due to the combination of this PY calculation and in conjunction with 18 F-35C USN a/c funded with PB27 mandatory funding. The F-35C USMC Program of Record is 140 but reported as 86 due to the combination of this PY calculation and in conjunction with 11 F-35C USMC a/c funded with PB27 mandatory funding. Calendar Year Advance Procurement for FY10 F-35B aircraft was included in the FY10 F-35C budget. The Advance Procurement Credit for FY10 F-35B aircraft was included in the FY11 F-35B budget. (2) The F-35C Carrier Variant (CV) Initial Operational Capability (IOC) occurred in February 2019 and Full Rate Production (FRP) decision occurred in March 2024 after completion of Initial Operational Test and Evaluation (IOT&E). (3) Starting in PB22 FY22 and forward, Exhibit P-5, P-5a, P-21, and P-10 are separated into Joint Strike Fighter-CV USN and Joint Strike Fighter-CV USMC. LI 0147 - Joint Strike Fighter CV Navy UNCLASSIFIED Page 1 of 28 P-1 Line #2 Volume 1 - 11 === page 62 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat Aircraft ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Program Elements for Code B Items: 0204146N Other Related Program Elements: 0204146M Line Item MDAP/MAIS Code: 198 The FY 2027 request for Joint Strike Fighter - CV includes $1,646,788 thousand of discretionary and $3,926,560 thousand of mandatory (reconciliation) for a total of $5,573,348 thousand. FY 2027 total funding collectively supports the procurement of 37 F-35Cs and supporting non-recurring flyaway and support efforts. The discretionary funds provide for the procurement of 8 F-35Cs, non-recurring flyaway and support efforts. The mandatory funds provide for the procurement of 29 F-35Cs, non-recurring flyaway, and support efforts. LI 0147 - Joint Strike Fighter CV Navy UNCLASSIFIED Page 2 of 28 P-1 Line #2 Volume 1 - 12 === page 63 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat Aircraft ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: 0204146N Other Related Program Elements: 0204146M Line Item MDAP/MAIS Code: 198 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / Joint Strike Fighter-CV USN P-5a, P-21 183 / 33,680.067 13 / 1,952.551 8 / 1,525.318 2 / 458.391 - / 0.000 P-5 2 / Joint Strike Fighter-CV USMC P-5a, P-21 13 / 1,834.659 4 / 521.004 4 / 571.207 6 / 913.772 - / 0.000 6 / 913.772 P-40 Total Gross/Weapon System Cost 196 / 35,514.726 17 / 2,473.555 12 / 2,096.525 8 / 1,372.163 - / 0.000 8 / 1,372.163 2 / 458.391 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: BASIS FOR FY 2027 BUDGET REQUEST: The FY 2027 budget provides funding for F-35C Aircraft and associated non-recurring and ancillary mission equipment to support delivery. The budget request also supports the advanced procurement and support requirements required for squadron standup and associated training and logistical requirements. Non-recurring flyaway costs for FY 2027 include costs for Special tooling and test equipment required to support full production capacity for hardware associated with delivering Block 4 capabilities. Non-recurring also includes funding to address Diminishing Manufacturing Sources (DMS) which include costs to manage DMS issues, procurement of bridge or life-of-type buys, and if cost-benefit analysis supports nonrecurring engineering to implement DMS redesigns within the performance envelope to the production line. Other non-recurring costs include chase support for government acceptance flights, Engineering Change Proposal Integration Contracts, systems engineering for production line efforts and production readiness reviews to address program risks and cost reduction initiatives. Support costs in FY 2027 include costs that are fixed in nature and costs that fluctuate based on site and squadron stand-ups. For F-35C, these costs include peculiar ground support equipment to support squadron and site stand-ups. FY 2027 support cost request includes equipment for First Aircraft Arrival (NAS Lemoore VFA 115 and MCAS Cherry Point VMFA-115) Squadron completion (VFA-115) and Ship SE outfitting (CVN-77 and CVN-79). Intermediate Level maintenance capability is also included in peculiar ground support equipment and this capability is specific to the Department of the Navy. The Department will continue implementing the strategy to transition the Autonomic Logistics Information System (ALIS) to the F-35 Operational Data Integrated Network (ODIN), a modern F-35 logistics and information system. Hardware being procured is compatible with both ALIS and ODIN software. Depot activation efforts continue in FY 2027 increasing repair capacity necessary for long-term sustainment of F-35 aircraft. FY 2027 request includes equipment to support establishment of depot repair capability, cyber compliance and capacity for components/sub-components across all US Depots, support equipment for air vehicle modification dock at Fleet Readiness Center Southeast, and Block 4 depot repair capability. FY 2027 includes funding for propulsion depot standup to include module repair activities to meet fleet repair requirements. LI 0147 - Joint Strike Fighter CV Navy UNCLASSIFIED Page 3 of 28 P-1 Line #2 Volume 1 - 13 === page 64 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Joint Strike Fighter-CV USN MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC 183 13 8 2 33,680.067 1,952.551 1,525.318 458.391 FY 2027 Total - 2 0.000 458.391 Less PY Advance Procurement ($ in Millions) 2,767.717 164.323 159.302 159.274 - 159.274 Net Procurement (P-1) ($ in Millions) 30,912.350 1,788.228 1,366.016 299.117 0.000 299.117 Plus CY Advance Procurement ($ in Millions) 2,867.993 150.556 122.536 405.431 - 405.431 Total Obligation Authority ($ in Millions) 33,780.343 1,938.784 1,488.552 704.548 0.000 704.548 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 184,044.082 - 150,196.231 - 190,664.750 - 229,195.500 - - 229,195.500 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost (†) 1.1.1) Airframe/CFE (1) 1.1.2) CFE Electronics (2) 1.1.3) Other GFE (3) 1.1.4) Other GFE APG-85 Radar (4) 1.1.5) Engines/Eng Acc (†) (5) 1.1.6) Rec Flyaway ECO (6) Subtotal: Recurring Cost 93,350.246 183 17,083.095 83,781.308 13 1,089.157 87,237.000 8 697.896 76,594.000 2 153.188 - - 0.000 76,594.000 2 153.188 18,519.273 183 3,389.027 12,408.462 13 161.310 14,374.500 8 114.996 12,822.000 2 25.644 - - 0.000 12,822.000 2 25.644 0.000 15 0.000 308.923 13 4.016 117.000 8 0.936 108.500 2 0.217 - - 0.000 108.500 2 0.217 - - 0.000 - 0.000 0.000 36,400.000 2 72.800 - - 0.000 36,400.000 2 72.800 - - - 19,356.164 183 3,542.178 15,800.000 13 205.400 15,957.500 8 127.660 14,539.500 2 29.079 - - 0.000 14,539.500 2 29.079 3,136.459 183 573.972 153.846 13 2.000 2,353.750 8 18.830 0.000 2 0.000 - - 0.000 0.000 2 0.000 - - 24,588.272 - - 1,461.883 - - 960.318 - - 280.928 - - 0.000 - - 280.928 - - 3,550.080 - - 30.088 - - 97.070 - - 0.000 - - 0.000 - - 0.000 - - 905.271 - - 83.108 - - 63.948 - - 0.000 - - 0.000 - - 0.000 - - 4,455.351 - - 113.196 - - 161.018 - - 0.000 - - 0.000 - - 0.000 - - 29,043.623 - - 1,575.079 - - 1,121.336 - - 280.928 - - 0.000 - - 280.928 Non Recurring Cost 1.2.1) Non- Recur Cost (7) 1.2.2) Ancillary Equip (8) Subtotal: Non Recurring Cost Subtotal: Flyaway Cost Support Cost LI 0147 - Joint Strike Fighter CV Navy UNCLASSIFIED Page 4 of 28 P-1 Line #2 Volume 1 - 14 === page 65 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Joint Strike Fighter-CV USN MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) (9) - - 639.748 - - 28.088 - - 67.617 - - 61.233 - - 0.000 - - 61.233 (10) - - 273.150 - - 0.000 - - 14.553 - - 0.754 - - 0.000 - - 0.754 - - 427.487 - - 4.121 - - 0.647 - - 5.572 - - 0.000 - - 5.572 - - 341.240 - - 0.000 - - 0.000 - - 1.245 - - 0.000 - - 1.245 - - 47.575 - - 7.238 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 173.904 - - 1.127 - - 7.214 - - 9.481 - - 0.000 - - 9.481 - - 771.496 - - 41.536 - - 35.630 - - 0.000 - - 0.000 - - 0.000 - - 820.316 - - 12.347 - - 23.904 - - 42.348 - - 0.000 - - 42.348 (16) - - 139.853 - - 128.223 - - 85.279 - - 56.521 - - 0.000 - - 56.521 2.10) Misc Support - - 4.013 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.11) Depot Standup - - 444.056 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 48.490 - - 9.389 - - 30.920 - - 0.000 - - 0.000 - - 0.000 - - 334.367 - - 102.534 - - 126.837 - - 0.000 - - 0.000 - - 0.000 (19) - - 170.749 - - 42.869 - - 11.381 - - 0.000 - - 0.000 - - 0.000 (20) - - 0.000 - - 0.000 - - 0.000 - - 0.309 - - 0.000 - - 0.309 - - 4,636.444 - - 377.472 - - 403.982 - - 177.463 - - 0.000 - - 177.463 183 33,680.067 150,196.231 458.391 - - 0.000 229,195.500 2.1) Airframe PGSE 2.2) Engine PGSE 2.3) Avionics PGSE 2.4) Pec Trng Eq (11) (12) 2.5) Full Mission Simulators 2.6) ODIN / TECH DATA (Previously ALIS) 2.7) Other ILS (13) (14) 2.8) Prod Eng Supt (15) 2.9) Fixed JPO Support 2.12) Depot Standup Software (17) 2.13) Depot Standup Air Vehicle (18) 2.14) Depot Standup Propulsion 2.15) JRE Subtotal: Support Cost Gross/Weapon System Cost 184,044.082 13 1,952.551 190,664.750 8 1,525.318 229,195.500 2 2 458.391 Remarks: Flyaway Unit Cost differs between USN & USMC due to cost share ratio at the enterprise level for Nonrecurring costs (Tooling and DMS Redesign/Management). These production non-recurring costs are included in the PSFD MOU (FMPD Annex). These costs are shared among the US Services and International Partners. For the US Services, the USMC contributes through the F-35B budget and the USN contribute through the F-35C budget. This drives the difference in USMC and USN F-35C Flyaway Unit Cost. (†) indicates the presence of a P-5a Footnotes: LI 0147 - Joint Strike Fighter CV Navy UNCLASSIFIED Page 5 of 28 P-1 Line #2 Volume 1 - 15 === page 66 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Joint Strike Fighter-CV USN MDAP/MAIS Code: (1) Airframe Unit Recurring Flyaway (URF) price is directly affected by a number of cost pressures including the United States Air Force (USAF) and Department of the Navy (DON) quantity profiles. URF costs are configuration updates, capability increments as well as inflation related cost pressures. FY 2027 includes $153,188 thousand discretionary funding for 2 F-35Cs, which includes PY AP, plus reconciliation funding for 18 F-35Cs for $1,378,691 thousand. (2) CFE Electronics (URF) price is directly affected by a number of cost pressures including the (USAF), (DON), Partner, and FMS quantity profiles. URF costs account for configuration updates, capability increments as well as inflation related cost pressures. FY 2027 includes $25,644 thousand discretionary funding for 2 F-35Cs, which includes PY AP, plus reconciliation funding for 18 F-35Cs for $230,793 thousand. (3) Other Government Furnished Equipment (GFE) captures non-prime contract URF costs, such as Cost Reduction Initiatives and GFE Workload efforts. FY 2027 includes $217 thousand discretionary funding for 2 F-35Cs, which includes PY AP, plus reconciliation funding for 18 F-35Cs for $1,956 thousand. (4) Other GFE - APG-85: FY27 continues the procurement of the APG-85 radar's which replaces the existing APG-81 radar in United States versions of F-35 aircraft. APG-85 just in time advance procurement for long lead materials is required two years in advance due to APG-85 manufacturing timelines and F-35 aircraft lot insertion schedules. See Adv Procurement P-40 and P-10 for additional details. FY27 accounts for Prior year Advance procurement and Budget year funding. FY 2027 includes $72,800 thousand discretionary funding, which includes PY AP, combined with the reconciliation funding for $103,462 thousand procures F-35C Radars. (5) Engine Unit Recurring Flyaway (URF) price is directly affected by a number of cost pressures including United States Air Force (USAF) and Department of the Navy (DON) quantity profiles and inflationary pressures. URF costs account for configuration updates, capability increments as well as inflation related cost pressures. FY 2027 includes $29,079 thousand discretionary funding for 2 F-35Cs, which includes PY AP, plus reconciliation funding for 18 F-35Cs for $261,710 thousand. (6) Engineering Change Order (ECO) URF price is directly affected by a number of cost pressures including the USAF and DON, Partner, and FMS quantity profiles. UFR costs account for configuration updates, capability increments as well as inflation related cost pressures. FY 2027 does not include discretionary funding, but does include reconciliation funding for $44,798 thousand procures F-35C ECOs. (7) NRE: Non-recurring Costs include items such as USN share of Production Non-Recurring Tooling necessary to capacitize the supply chain to build new Block 4 capabilities and maintain planned production schedules. Funding includes requirements for Diminishing Manufacturing Sources (DMS) "Life-of-type" part buys, management, and non-recurring redesign engineering, acceptance chase support, Engineering Change Proposal Integration Contracts, and technical assistance. This cost element includes variable (aircraft quantity driven) and fixed costs. NRE execution timelines are directly influenced by the aircraft and engine production Lot negotiation pricing and award timelines. FY27 costs are primarily driven by DMS Aircraft redesign increases for TR-3 Integrated Core Processor and Panoramic Cockpit Display Electronic Unit requirements. Additionally, funding accounts for production line tooling increases, canopy tooling to enable the manufacturer to up keep with the production line. Funding also accounts for Engineering Change Proposal Integration to help accelerate 8,000-flight-hour redesigns, as well as an expected increase in the need for design changes and improvements driven by discoveries from the growing fleet and the increased population of older aircraft, to include corrosion findings. FY 2027 does not include any discretionary funding, but does include reconciliation funding for $215,288 thousand. (8) Ancillary Equip: Equipment required to deliver fully mission capable aircraft. Costs are affected by pilot turnover, equipment inventory, and aircraft quantities, mission capabilities and aircraft configurations. Equipment and hardware includes Launcher Kits, Bomb Racks, Missile Launchers, Adapter Kits, Pylon Kits, Rail Launchers, Gun Pods, Magazines, Umbilical Cables, Pilot Flight Equipment (PFE), Helmet Mounted Displays (HMD), Portable Memory Devices (PMD). FY27 costs are driven by the transition to Organic Light Emitting Diode (OLED) helmets, which is expected to increase unit helmet mounted display costs and the transition to Technical Refresh 3 (TR3) Aircraft Memory System cartridges which are expected to decrease unit pilot furnished equipment costs. Aircraft armament equipment is bringing on emerging technologies to include LO Heavy Pylon and Six in the Bay systems. Across Ancillary equipment there is growth requiring capacity ramps within HMD and AAE. FY 2027 does not include any discretionary funding, but does include reconciliation funding for $86,100 thousand. (9) Airframe Peculiar Ground Support Equipment (PGSE): This element provides the projected costs for the procurement and delivery of airframe F-35 SE for On- and Off-Equipment maintenance tasks at the Organizational level. On-equipment maintenance supports on-aircraft sortie generation tasks, to include inspections, servicing, handling, weapons/stores loading, launch and recovery, aircraft turn around, component removal and replacement, and repairs by operations unit personnel. Off-equipment maintenance includes those tasks that cannot be effectively accomplished on the aircraft or end item. Organizational off-equipment maintenance may require the removal of the component to a maintenance facility. Off-equipment maintenance includes specific support equipment repair and servicing tasks. Increase in FY27 due to decrease Airframe site standups. FY27 consists of Aircraft Arrivals and Squadron Completions (FRS West VFA-125, and VFA-94), Operational Backfill, and Ship Backfill. (10) Engine PGSE: This element provides the projected costs for the procurement and delivery of propulsion F-35 SE for On- and Off-Equipment maintenance tasks at the Organizational level. On-equipment maintenance supports on-aircraft sortie generation tasks, to include inspections, servicing, handling, weapons/stores loading, launch and recovery, aircraft turn around, component removal and replacement, and repairs by operations unit personnel. Off-equipment maintenance includes those tasks that cannot be effectively accomplished on the aircraft or end item. Organizational off-equipment maintenance may require the removal of the component to a maintenance facility. Off-equipment maintenance includes specific support equipment repair and servicing tasks. Engine site stand up costs associated with Lemoore, VFA-94, fielded squadrons operational backfill, and ship backfill. LI 0147 - Joint Strike Fighter CV Navy UNCLASSIFIED Page 6 of 28 P-1 Line #2 Volume 1 - 16 === page 67 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Joint Strike Fighter-CV USN MDAP/MAIS Code: (11) Avionics PGSE: This element provides the projected costs for the procurement and delivery of avionics F-35 SE for On- and Off-Equipment maintenance tasks at the Organizational level. On-equipment maintenance supports on-aircraft sortie generation tasks, to include inspections, servicing, handling, weapons/stores loading, launch and recovery, aircraft turn around, component removal and replacement, and repairs by operations unit personnel. Off-equipment maintenance includes those tasks that cannot be effectively accomplished on the aircraft or end item. Organizational off-equipment maintenance may require the removal of the component to a maintenance facility. Off-equipment maintenance includes specific support equipment repair and servicing tasks. Avionic site stand up costs associated with Arrival and Squadron completion (NAS Lemoore VAF-94, and FRS VFA-125), and operational backfills. (12) (13) Peculiar Training Equipment: Costs support/procure peculiar training equipment at training and operational sites. ODIN/MPE/PUBS/TECH DATA: Costs support Autonomic Logistics Information System (ALIS)/Operational Data Integrated Network (ODIN) Equipment, Mission Planning Environment (MPE) Equipment, site activation support. The program will continue to procure and field Mission Planning Enterprise (MPE) Next-Gen Mission Planning (NGMP) hardware/software, to fully replace obsolete Ground Data Receptacles (GRDs) and server racks (SOU-C) with MPE Squadron Kits (MSKs), Inline field encryption devices (IFEDs) and cross-domain solutions (CDSs), and will continue to procure equipment for the Joint Reprogramming Enterprise U.S. Reprogramming Lab (USRL) to maintain air-system alignment and provide the latest rapid reprogramming capabilities. Year to year changes are influenced by the number of sites and squadrons. (14) Integrated Logistics Support (ILS): Unique ALIS/ODIN Administrator Standup, Shared Maintenance Planning, Unique Site Activation Planning, Pilot Flight Equipment (PFE) Chemical/Biological Procurement, PFE ATN Ancillary Pool, and WIN7 Migration. Technical solutions to mitigate emerging fleet issues related to usage, design, and readiness shortfalls. FY27 does not include any discretionary funding, and the reconciliation funding is for $65,037 thousand. (15) Production Engineering Support: Cost-shared with F-35 partners to ensure proper cost-sharing contribution to the enterprise wide requirement. Covering critical initiatives such as GSS Reset - Mx Initiatives, MxVS Plan Change (LM), and LM Aero Labs activities. (16) Fixed JPO Support: Starting in FY2022, Fixed JPO Support was broken out into a separate cost element from Production Engineering Support. Fixed JPO support costs are cost shared across the US and Partner participants and cost shares are balanced at the aggregate across all Services and appropriations. This cost element includes funds for the JPO program operations and administrative requirements at the enterprise level. Efforts in this cost element include working capital technical SME labor/civilian pay, program office Contractor Support Services, Arlington, VA, and Dayton, OH program unique off-base lease costs, travel, supplies, program office IT and software/hardware applications, cybersecurity, studies (to include audit and affordability studies), and program office oversight of property management. These costs are not programmed, budgeted, or funded as part of base operating support and are not associated with Headquarters level support. FY27 decrease to align with JPO IPT Split. FY27 includes $56,521 thousand discretionary funding combined with the reconciliation funding for $59,218 thousand. (17) Organic Software Center (Depot) Standup: This initiative activates organic software centers at Hill AFB, Warner Robins AFB, NAWCWD China Lake, and NAWCWD Pt. Mugu to enable independent software development and integration across the F-35 fleet for core software and infrastructure domains. Funding supports a range of government and industry activities, including hardware procurement and sustainment, licensing, and OEM support and training. The core infrastructure domains are System Integration Lab (SIL) at Hill AFB and the Mission Systems Integration Lab (MSIL) at NAWCWD China Lake. Core software domains are distributed across all the sites: Hill AFB manages Pilot Software Systems, Core Processing Software, System Design, and Build & Release, and shares Prognostic and Health Management with NAWCWD China Lake. Warner Robins AFB oversees the APG-81 Radar, External Data Links (XCOM), Electro-Optical Training Systems, and the Distributed Aperture System. NAWCWD China Lake is responsible for Fire, Control & Stores, Communications, Navigations, and Identification, Ownship Sensor Software, and Mission Processing/Data Collection. Finally, NAWCWD Pt. Mugu handles the Electronic Warfare domain. FY27 does not include any discretionary funding, and the reconciliation funding is for $38,524 thousand. (18) Depot Standup Air Vehicle: Costs support shared planning and activation across various depot capabilities, including LRU/SRC/DMS/Block 4 EW/APG-85 activation phases 1-4; CONUS component depot capacity expansion; depot weighing stations; OEM STE for TR-3 PCD EU/TR-3 ICP/NGDAS; ATE tech refresh (tester buy) & TPS rehost (FOT) to Win 10; depot test equipment spares; COMFRC/AFMETCAL/ CORONA activation support (labor/travel); dock expansion at Cherry Point & Ogden; and AV MROU activation - FRCSE (ALIS, facilities, & locally procured equipment, scuff & refresh). FY27 does not include any discretionary funding, and the reconciliation funding is for $170,595 thousand. (19) Depot Standup Propulsion: Shared planning and activation for Fleet Readiness Center East and Southeast. FY27 does not include any discretionary funding, and the reconciliation funding is for $24,138 thousand. (20) Joint Reprogramming Environment (JRE): Hardware Procurement for United States Research Laboratory. Funding provides hardware procurement for the latest matured operational prime mission equipment for the United States Research Laboratory. LI 0147 - Joint Strike Fighter CV Navy UNCLASSIFIED Page 7 of 28 P-1 Line #2 Volume 1 - 17 === page 68 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements O O C (†) FY 2022 1.1.1) Airframe/CFE Contractor and Location Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Joint Strike Fighter-CV USN Location of PCO Award Date Date of First Delivery Dec 2022 Aug 2025 12 81,955.917 Y LOCKHEED MARTIN (21) / FT WORTH SS / FPIF NAVAIR Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date Jan 2020 (†) 2023 LOCKHEED MARTIN (21) / FT WORTH SS / FPIF NAVAIR Apr 2023 Nov 2025 13 77,034.615 Y Jan 2020 (†) 2024 LOCKHEED MARTIN (21) / FT WORTH SS / FPIF NAVAIR Dec 2024 Mar 2027 15 80,447.000 Y Mar 2023 (†) 2025 LOCKHEED MARTIN (21) / FT WORTH SS / FPIF NAVAIR Mar 2025 Jun 2027 13 83,781.308 Y Mar 2023 LOCKHEED MARTIN (21) / FT WORTH TBD NAVAIR Dec 2026 Mar 2029 8 87,237.000 Y Jan 2025 LOCKHEED MARTIN (21) / FT WORTH TBD NAVAIR Dec 2026 Mar 2029 2 76,594.000 Y Jan 2025 2022 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Jan 2023 May 2024 12 15,970.083 Y Mar 2020 2023 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Jun 2023 Mar 2025 13 12,648.846 Y Mar 2020 2024 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Jan 2025 Jun 2026 15 14,910.867 Y May 2023 2025 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Jun 2025 Aug 2026 13 15,800.000 Y May 2023 2026 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT TBD NAVAIR Apr 2027 Jun 2028 8 15,957.500 Y Mar 2025 2027 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT TBD NAVAIR Jun 2027 Aug 2028 2 14,539.500 Y Jan 2027 CFE- Airframe Long Lead: TR3, Bulkhead 2022 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Mar 2022 Sep 2023 13 8,269.692 Y Jan 2020 CFE- Airframe Long Lead: TR3, Bulkhead 2023 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Dec 2022 Jun 2024 15 7,130.000 Y Jan 2020 CFE- Airframe Long Lead: TR3, Bulkhead 2024 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Dec 2023 Jun 2025 15 6,224.933 Y Mar 2023 CFE- Airframe Long Lead: TR3, Bulkhead 2025 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Dec 2024 Jun 2026 6 13,725.500 Y Mar 2023 CFE- Airframe Long Lead: TR3, Bulkhead 2026 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Dec 2025 Jun 2027 5 8,338.000 Y Jan 2025 CFE- Airframe Long Lead: TR3, Bulkhead 2027 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Dec 2026 Jun 2028 20 9,415.750 Y Jan 2026 CFE- Airframe Long Lead: TR3, Bulkhead 2028 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Dec 2027 Jun 2029 20 9,656.000 Y Jan 2026 CFE- Airframe Long Lead: TR3, Bulkhead 2029 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Dec 2028 Jun 2030 22 9,857.591 Y Jan 2026 CFE- Airframe Long Lead: TR3, Bulkhead 2030 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Dec 2029 Jun 2031 24 9,954.042 Y Jan 2026 1.1.1) Airframe/CFE 1.1.1) Airframe/CFE 1.1.1) Airframe/CFE (†) 2026 (†) 2027 1.1.1) Airframe/CFE 1.1.1) Airframe/CFE 1.1.5) Engines/Eng Acc (†) 1.1.5) Engines/Eng Acc (†) 1.1.5) Engines/Eng Acc (†) 1.1.5) Engines/Eng Acc (†) 1.1.5) Engines/Eng Acc (†) 1.1.5) Engines/Eng Acc (†) Advance Procurement LI 0147 - Joint Strike Fighter CV Navy UNCLASSIFIED Page 8 of 28 P-1 Line #2 Volume 1 - 18 === page 69 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Item Number / Title [DODIC]: 1 / Joint Strike Fighter-CV USN FY Contractor and Location Method/Type or Funding Vehicle CFE- Airframe Long Lead: TR3, Bulkhead 2031 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Dec 2030 Jun 2032 20 10,052.200 Y Jan 2026 Other GFE - APG85 Radar - Two year long lead AP 2025 Northrop Grumman / Baltimore SS / FFP NAVAIR Sep 2025 Sep 2028 14 1,502.357 Y Sep 2025 Other GFE - APG85 Radar - Two year long lead AP 2026 Northrop Grumman / Baltimore SS / FFP NAVAIR Nov 2026 Oct 2028 11 1,846.909 Y Mar 2026 Other GFE - APG85 Radar - Two year long lead AP 2027 Northrop Grumman / Baltimore SS / FFP NAVAIR Feb 2027 Jan 2029 20 1,742.800 Y Jun 2026 Other GFE - APG85 Radar - Two year long lead AP 2028 Northrop Grumman / Baltimore SS / FFP NAVAIR Jan 2028 Dec 2029 22 1,750.364 Y Mar 2027 Other GFE - APG85 Radar - Two year long lead AP 2029 Northrop Grumman / Baltimore SS / FFP NAVAIR Jan 2029 Dec 2030 24 1,761.917 Y Mar 2028 Other GFE - APG85 Radar - Two year long lead AP 2030 Northrop Grumman / Baltimore SS / FFP NAVAIR Jan 2030 Dec 2031 20 1,773.750 Y Mar 2029 Other GFE - APG85 Radar - Two year long lead AP 2031 Northrop Grumman / Baltimore SS / FFP NAVAIR Jan 2031 Dec 2032 15 2,265.067 Y Mar 2030 Other GFE - APG85 Radar - One year long lead AP 2026 Northrop Grumman / Baltimore SS / FFP NAVAIR Nov 2026 Oct 2028 8 6,470.875 Y Mar 2026 Other GFE - APG85 Radar - One year long lead AP 2027 Northrop Grumman / Baltimore SS / FFP NAVAIR Nov 2027 Oct 2029 20 7,706.050 Y Mar 2026 Other GFE - APG85 Radar - One year long lead AP 2028 Northrop Grumman / Baltimore SS / FFP NAVAIR Feb 2028 Jan 2030 20 6,971.200 Y Mar 2027 Other GFE - APG85 Radar - One year long lead AP 2029 Northrop Grumman / Baltimore SS / FFP NAVAIR Jan 2029 Dec 2030 22 7,001.545 Y Mar 2028 Other GFE - APG85 Radar - One year long lead AP 2030 Northrop Grumman / Baltimore SS / FFP NAVAIR Jan 2030 Dec 2031 24 7,047.667 Y Mar 2029 Other GFE - APG85 Radar - One year long lead AP 2031 Northrop Grumman / Baltimore SS / FFP NAVAIR Jan 2031 Dec 2032 20 7,095.100 Y Mar 2030 GFE-Engines Long Lead: MountSignal & IDMS Rings 2022 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2022 Aug 2023 13 2.278 Y Mar 2020 GFE-Engines Long Lead: MountSignal & IDMS Rings 2023 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2023 Aug 2024 15 2.867 Y Mar 2020 GFE-Engines Long Lead: MountSignal & IDMS Rings 2024 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2024 Aug 2025 15 2.800 Y Jan 2023 GFE-Engines Long Lead: MountSignal & IDMS Rings 2025 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2025 Aug 2026 6 6.833 Y Jan 2023 GFE-Engines Long Lead: MountSignal & IDMS Rings 2026 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2026 Aug 2027 5 15.600 Y Jan 2023 GFE-Engines Long Lead: MountSignal & IDMS Rings 2027 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2027 Aug 2028 20 13.000 Y Mar 2026 Cost Elements O O C P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV LI 0147 - Joint Strike Fighter CV Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 9 of 28 P-1 Line #2 Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date Volume 1 - 19 === page 70 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements O O C P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Joint Strike Fighter-CV USN Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty RFP Issue Date FY Contractor and Location GFE-Engines Long Lead: MountSignal & IDMS Rings 2028 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2028 Aug 2029 20 24.000 Y Jan 2027 GFE-Engines Long Lead: MountSignal & IDMS Rings 2029 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2029 Aug 2030 22 26.000 Y Jan 2028 GFE-Engines Long Lead: MountSignal & IDMS Rings 2030 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2030 Aug 2031 24 28.000 Y Jan 2029 GFE-Engines Long Lead: MountSignal & IDMS Rings 2031 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2031 Aug 2032 20 30.000 Y Jan 2030 GFE-Engines Long Lead: IDMS Ring, Forward 2022 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2022 Aug 2023 13 5.077 Y Mar 2021 GFE-Engines Long Lead: IDMS Ring, Forward 2023 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Mar 2023 Sep 2024 15 4.267 Y Mar 2022 GFE-Engines Long Lead: IDMS Ring, Forward 2024 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2024 Aug 2025 15 4.400 Y Mar 2023 GFE-Engines Long Lead: IDMS Ring, Forward 2025 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2025 Aug 2026 6 10.000 Y Mar 2024 GFE-Engines Long Lead: IDMS Ring, Rear 2022 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2022 Aug 2023 13 4.692 Y Mar 2021 GFE-Engines Long Lead: IDMS Ring, Rear 2023 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Mar 2023 Sep 2024 15 4.267 Y Mar 2022 GFE-Engines Long Lead: IDMS Ring, Rear 2024 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2024 Aug 2025 15 4.400 Y Mar 2023 GFE-Engines Long Lead: IDMS Ring, Rear 2025 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2025 Aug 2026 6 10.000 Y Mar 2024 GFE-Engines Long Lead: Advance Acquisition Contracts 2022 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2022 Aug 2023 13 2,680.462 Y Mar 2021 GFE-Engines Long Lead: Advance Acquisition Contracts 2023 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Mar 2023 Sep 2024 15 1,452.467 Y Mar 2022 GFE-Engines Long Lead: Advance Acquisition Contracts 2024 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2024 Aug 2025 15 1,688.200 Y Mar 2023 GFE-Engines Long Lead: Advance Acquisition Contracts 2025 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2025 Aug 2026 6 3,653.833 Y Mar 2024 GFE-Engines Long Lead: Advance Acquisition Contracts 2026 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2026 Aug 2027 5 1,737.000 Y Mar 2025 GFE-Engines Long Lead: Advance Acquisition Contracts 2027 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2027 Aug 2028 20 1,393.950 Y Mar 2026 GFE-Engines Long Lead: Advance Acquisition Contracts 2028 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2028 Aug 2029 20 1,418.800 Y Mar 2027 GFE-Engines Long Lead: Advance Acquisition Contracts 2029 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2029 Aug 2030 22 1,446.955 Y Mar 2027 LI 0147 - Joint Strike Fighter CV Navy UNCLASSIFIED Page 10 of 28 P-1 Line #2 (Each) Volume 1 - 20 === page 71 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (†) O O C P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Joint Strike Fighter-CV USN Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty RFP Issue Date FY Contractor and Location GFE-Engines Long Lead: Advance Acquisition Contracts 2030 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2030 Aug 2031 24 1,459.429 Y Mar 2027 GFE-Engines Long Lead: Advance Acquisition Contracts 2031 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2031 Aug 2032 20 1,472.050 Y Mar 2027 (Each) indicates the presence of a P-21 Footnotes: (21) F-35C production capacity is influenced by F-35B quantities. Maximum combined production including partners for F-35B and F-35C is 60 per year. LI 0147 - Joint Strike Fighter CV Navy UNCLASSIFIED Page 11 of 28 P-1 Line #2 Volume 1 - 21 === page 72 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / Joint Strike Fighter-CV USN Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 143 1 2022 NAVY 12 0 12 1 2023 NAVY 13 0 13 1 2024 NAVY 15 0 15 15 1 2025 NAVY 13 0 13 13 1 2026 NAVY 8 0 8 8 1 2027 NAVY 2 0 2 2 1.1.5) Engines/Eng Acc A - - - - - - - - - - - - - - - - - - - - - - 12 A - - - - - - - - - - - - - - - - - - 13 (5) Prior Years Deliveries: 143 2 2022 NAVY 12 0 12 2 2023 NAVY 13 0 13 A - 2 2024 NAVY 15 0 15 15 2 2025 NAVY 13 0 13 13 2 2026 NAVY 8 0 8 8 2 2027 NAVY 2 0 2 - - - - - - - - - - - - - - A - - - - - - - - - - - 2 2 - 3 - 3 - 2 - - 0 13 2 O C T LI 0147 - Joint Strike Fighter CV Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 28 S E P O C T N O V D E C J A N F E B P-1 Line #2 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 22 === page 73 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / Joint Strike Fighter-CV USN Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 143 1 2022 NAVY 12 0 12 - - - - - - - - - - 1 2023 NAVY 13 0 13 - - - - - - - - - - - - - 1 2024 NAVY 15 0 15 A - - - - - - - - - - - - - - - - - - - - - - 15 1 2025 NAVY 13 0 13 A - - - - - - - - - - - - - - - - - - - 13 1 2026 NAVY 8 0 8 8 1 2027 NAVY 2 0 2 2 1.1.5) Engines/Eng Acc 1 1 2 3 - 1 1 1 5 1 0 1 1 1 2 1 2 1 0 (5) Prior Years Deliveries: 143 2 2022 NAVY 12 12 0 2 2023 NAVY 13 0 13 2 2024 NAVY 15 0 15 2 2025 NAVY 13 0 13 2 2026 NAVY 8 0 8 2 2027 NAVY 2 0 2 0 - - - - A - - 1 1 - 1 - 1 - 2 2 1 2 2 0 - - - - - - - - - - - - A - - - - - - - - - - - - 1 1 - - 1 1 11 1 1 11 8 2 O C T LI 0147 - Joint Strike Fighter CV Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 28 S E P O C T N O V D E C J A N F E B P-1 Line #2 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 23 === page 74 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / Joint Strike Fighter-CV USN Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 143 1 2022 NAVY 12 12 0 1 2023 NAVY 13 13 0 1 2024 NAVY 15 0 15 - - - - - 1 2025 NAVY 13 0 13 - - - - - - - - 1 2026 NAVY 8 0 8 A - - - - - - - - - - - - - - - - - - - - - - 8 1 2027 NAVY 2 0 2 A - - - - - - - - - - - - - - - - - - - - - - 2 1.1.5) Engines/Eng Acc 0 0 3 2 2 - 2 1 - 2 2 2 - 2 2 2 - 1 2 1 0 1 1 0 (5) Prior Years Deliveries: 143 2 2022 NAVY 12 12 0 2 2023 NAVY 13 13 0 0 2 2024 NAVY 15 4 11 1 2 1 2 2 3 2 2025 NAVY 13 2 11 1 1 1 1 1 2 2 2026 NAVY 8 0 8 2 2027 NAVY 2 0 2 0 1 A O C T LI 0147 - Joint Strike Fighter CV Navy 0 1 N O V D E C J A N F E B M A R A P R 1 M A Y 1 0 - - - - - - - - - - - - A - - - - - - - - - - - - J U N J U L A U G UNCLASSIFIED Page 14 of 28 S E P O C T N O V D E C J A N F E B P-1 Line #2 M A R A P R M A Y 1 1 J U N 1 J U L - 1 A U G 5 1 S E P Volume 1 - 24 0 === page 75 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / Joint Strike Fighter-CV USN Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 143 1 2022 NAVY 12 12 0 0 1 2023 NAVY 13 13 0 0 1 2024 NAVY 15 15 0 0 1 2025 NAVY 13 13 0 1 2026 NAVY 8 0 8 - - - - - 1 1 1 2027 NAVY 2 0 2 - - - - - 1 1 1.1.5) Engines/Eng Acc 0 1 1 1 1 1 1 0 0 (5) Prior Years Deliveries: 143 2 2022 NAVY 12 12 0 0 2 2023 NAVY 13 13 0 0 2 2024 NAVY 15 15 0 0 2 2025 NAVY 13 13 0 2 2026 NAVY 8 3 5 2 2027 NAVY 2 2 0 0 1 1 1 1 0 0 O C T LI 0147 - Joint Strike Fighter CV Navy 1 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 28 S E P O C T N O V D E C J A N F E B P-1 Line #2 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 25 === page 76 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Item Number / Title [DODIC]: 1 / Joint Strike Fighter-CV USN Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 12 12 30 8 6 24 30 24 3 27 30 12 12 30 8 4 17 21 0 6 14 20 1 LOCKHEED MARTIN (21) FT WORTH 2 UNITED TECH, PRATT & WHITNEY - EAST HARTFORD, CT "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (21) F-35C production capacity is influenced by F-35B quantities. Maximum combined production including partners for F-35B and F-35C is 60 per year. LI 0147 - Joint Strike Fighter CV Navy UNCLASSIFIED Page 16 of 28 P-1 Line #2 Volume 1 - 26 === page 77 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Joint Strike Fighter-CV USMC MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2027 Base FY 2027 OOC 4 6 1,834.659 521.004 571.207 913.772 FY 2027 Total - 6 0.000 913.772 175.270 53.662 53.980 40.861 - 40.861 1,659.389 467.342 517.227 872.911 0.000 872.911 136.068 46.078 279.060 245.650 - 245.650 1,795.457 513.420 796.287 1,118.561 0.000 1,118.561 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2026 4 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2025 13 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 141,127.615 - 130,251.000 - 142,801.750 - 152,295.333 - - 152,295.333 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost (†) 1.1.1) Airframe/CFE (22) 1.1.2) CFE Electronics (23) 1.1.3) Other GFE APG-85 Radar (24) 1.1.4) Other GFE (25) 1.1.5) Engines / Eng Acc (†) (26) 1.1.6) Rec Flyaway ECO (27) Subtotal: Recurring Cost 83,087.538 13 1,080.138 83,716.250 4 334.865 87,237.000 4 348.948 76,594.000 6 459.564 - - 0.000 76,594.000 6 459.564 15,768.462 13 204.990 12,509.250 4 50.037 14,374.500 4 57.498 12,822.000 6 76.932 - - 0.000 12,822.000 6 76.932 - - 0.000 0.000 15,166.667 6 91.000 - - 0.000 15,166.667 6 91.000 - - 0.000 141.250 4 0.565 117.000 4 0.468 108.500 6 0.651 - - 0.000 108.500 6 0.651 14,925.923 13 194.037 15,915.500 4 63.662 15,957.500 4 63.830 14,539.500 6 87.237 - - 0.000 14,539.500 6 87.237 2,272.846 13 29.547 100.000 4 0.400 2,353.750 4 9.415 2,239.833 6 13.439 - - 0.000 2,239.833 6 13.439 - - 1,508.712 - - 449.529 - - 480.159 - - 728.823 - - 0.000 - - 728.823 - - 32.561 - - 0.971 - - 10.724 - - 12.774 - - 0.000 - - 12.774 - - 59.390 - - 19.389 - - 21.444 - - 34.148 - - 0.000 - - 34.148 - - 91.951 - - 20.360 - - 32.168 - - 46.922 - - 0.000 - - 46.922 - - 1,600.663 - - 469.889 - - 512.327 - - 775.745 - - 0.000 - - 775.745 - - 0.000 - - Non Recurring Cost 1.2.1) Non-Recur Cost (28) 1.2.2) Ancillary Equip (29) Subtotal: Non Recurring Cost Subtotal: Flyaway Cost Support Cost LI 0147 - Joint Strike Fighter CV Navy UNCLASSIFIED Page 17 of 28 P-1 Line #2 Volume 1 - 27 === page 78 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Joint Strike Fighter-CV USMC MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) (30) ($ M) ($ K) Qty (Each) ($ M) Unit Cost ($ K) Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) 47.548 - - 4.516 - - 12.561 - - 7.541 - - 0.000 - - 7.541 - - 3.374 - - 0.000 - - 0.836 - - 1.843 - - 0.000 - - 1.843 - - 7.311 - - 0.000 - - 2.950 - - 0.176 - - 0.000 - - 0.176 - - 2.270 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 9.770 - - 5.403 - - 0.000 - - 2.127 - - 0.000 - - 2.127 - - 0.000 - - 5.186 - - 0.000 - - 1.461 - - 0.000 - - 1.461 - - 13.983 - - 5.199 - - 5.796 - - 5.622 - - 0.000 - - 5.622 - - 12.522 - - 1.742 - - 4.174 - - 24.394 - - 0.000 - - 24.394 - - 22.124 - - 4.467 - - 6.593 - - 18.032 - - 0.000 - - 18.032 - - 10.520 - - 1.439 - - 4.842 - - 12.841 - - 0.000 - - 12.841 - - 54.898 - - 19.955 - - 19.346 - - 55.841 - - 0.000 - - 55.841 (40) - - 49.676 - - 3.208 - - 1.782 - - 8.046 - - 0.000 - - 8.046 (41) - - 0.000 - - 0.000 - - 0.000 - - 0.103 - - 0.000 - - 0.103 - - 233.996 - - 51.115 - - 58.880 - - 138.027 - - 0.000 - - 138.027 913.772 - - 0.000 152,295.333 (31) 2.3) Avionics PGSE (32) 2.4) Pec Trng Eq 2.5) ODIN / TECH DATA (Previously ALIS) (33) 2.6) Full Mission Sims 2.7) Other ILS (34) (35) 2.8) Prod Eng Supt (36) 2.9) Fixed JPO Support (37) 2.11) Depot Standup (38) 2.12) Depot Standup Air (39) 2.13) Depot Standup Propulsion 2.14) JRE (Each) Unit Cost FY 2027 Base Total Cost - 2.2) Engine PGSE Vehicle Qty FY 2026 Total Cost - 2.1) Airframe PGSE Software FY 2025 Total Cost Subtotal: Support Cost Gross/Weapon System Cost 141,127.615 13 1,834.659 130,251.000 4 521.004 142,801.750 4 571.207 152,295.333 6 6 913.772 Remarks: Flyaway Unit Cost differs between USN & USMC due to cost share ratio at the enterprise level for Nonrecurring costs (Tooling and DMS Redesign/Management). These production non-recurring costs are included in the PSFD MOU (FMPD Annex). These costs are shared among the US Services and International Partners. For the US Services, the USMC contributes through the F-35B budget and the USN contribute through the F-35C budget. This drives the difference in USMC and USN F-35C Flyaway Unit Cost. (†) indicates the presence of a P-5a Footnotes: (22) Airframe Unit Recurring Flyaway (URF) price is directly affected by a number of cost pressures including the United States Air Force (USAF) and Department of the Navy (DON), Partner, and Foreign Military Sales (FMS) quantity profiles. URF costs account for configuration updates, capability increments as well as inflation related cost pressures. FY 2027 includes $459,564 thousand discretionary funding for 6 F-35Cs, which includes PY AP, plus reconciliation funding for 11 F-35Cs for $842,533 thousand. LI 0147 - Joint Strike Fighter CV Navy UNCLASSIFIED Page 18 of 28 P-1 Line #2 Volume 1 - 28 === page 79 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / Joint Strike Fighter-CV USMC MDAP/MAIS Code: (23) CFE Electronics (URF) price is directly affected by a number of cost pressures including the (USAF), and (DON), Partner, and FMS quantity profiles. URF CFE Electronics costs account for configuration updates, capability increments as well as inflation related cost pressures. FY 2027 includes $76,932 thousand discretionary funding for 6 F-35Cs, which includes PY AP, plus reconciliation funding for 11 F-35Cs for $141,040 thousand. (24) FY27 continues the procurement of the APG-85 radar's which replaces the existing APG-81 radar in United States versions of F-35 aircraft. APG-85 just in time advance procurement for long lead materials is required two years in advance due to APG-85 manufacturing timelines and F-35 aircraft lot insertion schedules. See Adv Procurement P-40 and P-10 for additional details. FY27 accounts for Prior Year Advance procurement and Budget Year funding. FY 2027 includes $91,000 thousand discretionary funding, which includes PY AP, combined with the reconciliation funding for $58,822 thousand procures Radars for the 6 discretionary F-35Cs and 11 reconciliation F-35Cs. (25) Other Government Furnished Equipment (GFE) captures non-prime contract URF costs, such as Cost Reduction Initiatives and GFE Workload efforts. FY 2027 includes $651 thousand discretionary funding for 6 F-35Cs, which includes PY AP, plus reconciliation funding for 11 F-35Cs for $1,195 thousand. (26) Engine Unit Recurring Flyaway (URF) price is directly affected by a number of cost pressures including (USAF), (DON), Partners, and FMS quantity profiles and inflationary pressures. URF costs account for configuration updates, supplier escalation, capability increments as well as inflation related cost pressures. FY27 accounts for Prior Year Advance procurement and Budget Year funding. FY 2027 includes $87,237 thousand discretionary funding for 6 F-35Cs, which includes PY AP, plus reconciliation funding for 11 F-35Cs for $159,934 thousand. (27) Engineering Change Order (ECO) URF price is directly affected by a number of cost pressures including the USAF and DON, Partner, and FMS quantity profiles. URF costs account for capability increments as well as inflation related cost pressures. FY 2027 includes $13,439 thousand discretionary funding for 6 F-35Cs, which includes PY AP, plus reconciliation funding for 11 F-35Cs for $24,639 thousand. (28) NRE: Non-recurring Costs include items such as USMC share of Production Non-Recurring Tooling necessary to capacitize the supply chain to build new Block 4 capabilities and maintain planned production schedules. Funding includes requirements for Diminishing Manufacturing Sources (DMS) "Life-of-type" part buys and Engineering Change Proposal Integration Contracts. This cost element includes variable (aircraft quantity driven) and fixed costs. NRE execution timelines are directly influenced by the aircraft and engine production Lot negotiation pricing and award timelines. FY27 costs are primarily driven by Engineering Change Proposal Integration to help accelerate 8,000-flight-hour redesigns. FY 2027 includes $12,774 thousand discretionary funding plus reconciliation funding for $661 thousand. (29) Ancillary Equip: Equipment required to deliver fully mission capable aircraft. Costs are affected by pilot turnover, equipment inventory, aircraft quantities, mission capabilities and aircraft configurations. Equipment and hardware includes Launcher Kits, Bomb Racks, Missile Launchers, Adapter Kits, Pylon Kits, Rail Launchers, Gun Pods, Magazines, Umbilical Cables, Pilot Flight Equipment (PFE), Helmet Mounted Displays (HMD), Portable Memory Devices (PMD). Pilot throughput, rather than aircraft quantity, will drive requirements for helmet mounted displays, and pilot furnished equipment. FY27 increase is due to transitioning to an Organic Light Emitting Diode (OLED) helmet, which increases the overall unit helmet mounted display costs. Transition to TR3 Aircraft Memory System cartridges is expected to increase unit pilot furnished equipment costs. FY 2027 includes $34,148 thousand discretionary funding plus reconciliation funding for $1,376 thousand. (30) Airframe Peculiar Ground Support Equipment (PGSE): This element provides the projected costs for the procurement and delivery of airframe F-35 SE for On- and Off-Equipment maintenance tasks at the Organizational level. On-equipment maintenance supports on-aircraft sortie generation tasks, to include inspections, servicing, handling, weapons/stores loading, launch and recovery, aircraft turn around, component removal and replacement, and repairs by operations unit personnel. Off-equipment maintenance includes those tasks that cannot be effectively accomplished on the aircraft or end item. Organizational off-equipment maintenance may require the removal of the component to a maintenance facility. Off-equipment maintenance includes specific support equipment repair and servicing tasks. (31) Engine PGSE: This element provides the projected costs for the procurement and delivery of propulsion F-35 SE for On- and Off-Equipment maintenance tasks at the Organizational level. On-equipment maintenance supports on-aircraft sortie generation tasks, to include inspections, servicing, handling, weapons/stores loading, launch and recovery, aircraft turn around, component removal and replacement, and repairs by operations unit personnel. Off-equipment maintenance includes those tasks that cannot be effectively accomplished on the aircraft or end item. Organizational off-equipment maintenance may require the removal of the component to a maintenance facility. Off-equipment maintenance includes specific support equipment repair and servicing tasks. (32) Avionics PGSE: This element provides the projected costs for the procurement and delivery of avionics F-35 SE for On- and Off-Equipment maintenance tasks at the Organizational level. On-equipment maintenance supports on-aircraft sortie generation tasks, to include inspections, servicing, handling, weapons/stores loading, launch and recovery, aircraft turn around, component removal and replacement, and repairs by operations unit personnel. Off-equipment maintenance includes those tasks that cannot be effectively accomplished on the aircraft or end item. Organizational off-equipment maintenance may require the removal of the component to a maintenance facility. Off-equipment maintenance includes specific support equipment repair and servicing tasks. (33) ODIN/MPE/PUBS/TECH DATA: Costs support Autonomic Logistics Information System (ALIS)/Operational Data Integrated Network (ODIN) Equipment, Mission Planning Environment (MPE) Equipment, site activation support. The program will continue to procure and field Mission Planning Enterprise (MPE) Next-Gen Mission Planning (NGMP) hardware/software, to fully replace obsolete Ground Data Receptacles (GRDs) and server racks (SOU-C) with MPE Squadron Kits (MSKs), Inline field encryption devices (IFEDs) and cross-domain solutions (CDSs), and will continue to procure equipment for the Joint Reprogramming Enterprise U.S. Reprogramming Lab (USRL) to maintain air-system alignment and provide the latest rapid reprogramming capabilities. Year to year changes are influenced by the number of sites and squadrons. LI 0147 - Joint Strike Fighter CV Navy UNCLASSIFIED Page 19 of 28 P-1 Line #2 Volume 1 - 29 === page 80 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV ID Code (A=Service Ready, B=Not Service Ready) : (34) (35) Item Number / Title [DODIC]: 2 / Joint Strike Fighter-CV USMC MDAP/MAIS Code: Full Mission Sims (FMS): FY27 funding is required for the procurement of initial Pilot Training Devices to support the USMC bed down plan and meet necessary pilot throughput. Integrated Logistics Support (ILS): Unique ALIS/ODIN Administrator Standup, Shared Maintenance Planning, Government Property Management Planning, (PFE) ATN Ancillary Pool, Pilot Flight Equipment (PFE) Chemical/ Biological Procurement, and WIN7 migration. Technical Data for Provisioning and Cataloging costs support the NDAA Sec142 direction to transition Sustainment Supply Support efforts to the US Services. Technical solutions to mitigate emerging fleet issues related to usage, design, and readiness shortfalls. FY27 includes $5,622 thousand discretionary funding combined with the reconciliation funding for $16,051 thousand. (36) Production Engineering Support is cost-shared with F-35 partners to ensure proper cost-sharing contribution to the enterprise-wide requirement. Funds propulsion Program Admin Labor, Sustainment Improvement Plan activities. FY27 increases are for Global Sustainment Strategy Reset effort for Maintenance Initiatives. (37) Fixed JPO Support: Starting in FY2022, Fixed JPO Support was broken out into a separate cost element. Fixed JPO support costs are cost shared across the US and Partner participants and cost shares are balanced at the aggregate across all Services and appropriations. This cost element includes funds for the JPO program operations and administrative requirements at the enterprise level. Efforts in this cost element include working capital technical SME labor/civilian pay, program office Contractor Support Services, Arlington, VA, and Dayton, OH program unique off-base lease costs, travel, supplies, program office IT and software applications, cybersecurity, studies, and program office oversight of property management. These costs are not programmed, budgeted, or funded as part of base operating support and are not associated with Headquarters level support. The F-35 JPO continues to review program office civilian pay and contractor support. (38) Organic Software Center (Depot) Standup: This initiative activates organic software centers at Hill AFB, Warner Robins AFB, NAWCWD China Lake, and NAWCWD Pt. Mugu to enable independent software development and integration across the F-35 fleet for core software and infrastructure domains. Funding supports a range of government and industry activities, including hardware procurement and sustainment, licensing, and OEM support and training. The core infrastructure domains are System Integration Lab (SIL) at Hill AFB and the Mission Systems Integration Lab (MSIL) at NAWCWD China Lake. Core software domains are distributed across all the sites: Hill AFB manages Pilot Software Systems, Core Processing Software, System Design, and Build & Release, and shares Prognostic and Health Management with NAWCWD China Lake. Warner Robins AFB oversees the APG-81 Radar, External Data Links (XCOM), Electro-Optical Training Systems, and the Distributed Aperture System. NAWCWD China Lake is responsible for Fire, Control & Stores, Communications, Navigations, and Identification, Ownship Sensor Software, and Mission Processing/Data Collection. Finally, NAWCWD Pt. Mugu handles the Electronic Warfare domain. (39) Depot Standup Air Vehicle: Costs support shared planning and activation for component-level capability and airframe depots, including LRU/SRC/DMS/Block 4 EW/APG-85 activation phases 1-4; CONUS component depot capacity expansion; depot weighing stations; OEM STE for TR-3 PCD EU/TR-3 ICP/NGDAS; ATE tech refresh (tester buy) & TPS rehost (FOT) to Win 10; depot test equipment spares; COMFRC/AFMETCAL/CORONA activation support (labor/travel); dock expansion at Cherry Point & Ogden; and AV MROU activation - FRCSE (ALIS, facilities, & locally procured equipment, scuff & refresh). (40) (41) Depot Standup Propulsion: Shared planning and activation for Fleet Readiness Center East and Southeast. Joint Reprogramming Environment (JRE): Hardware Procurement for United States Research Laboratory. Funding provides hardware procurement for the latest matured operational prime mission equipment for the United States Research Laboratory. LI 0147 - Joint Strike Fighter CV Navy UNCLASSIFIED Page 20 of 28 P-1 Line #2 Volume 1 - 30 === page 81 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Item Number / Title [DODIC]: 2 / Joint Strike Fighter-CV USMC FY Contractor and Location Method/Type or Funding Vehicle (†) 2022 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR (†) 2023 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Apr 2023 Nov 2025 6 73,866.667 Y Jan 2020 (†) 2024 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Dec 2024 Mar 2027 4 77,278.500 Y Mar 2023 (†) 2025 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Mar 2025 Jun 2027 4 83,716.250 Y Mar 2023 (†) 2026 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Dec 2026 Mar 2029 4 87,237.000 Y Jan 2025 (†) 2027 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Dec 2026 Mar 2029 6 76,594.000 Y Jan 2025 2022 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Oct 2022 Mar 2024 3 21,293.333 Y Mar 2020 2023 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Jun 2023 Nov 2024 6 12,647.000 Y Jan 2023 2024 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Jan 2025 Jun 2026 4 13,568.750 Y Jan 2024 2025 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Jun 2025 Nov 2026 4 15,915.500 Y Jan 2025 2026 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Apr 2027 Sep 2028 4 15,957.500 Y Jan 2026 2027 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Jun 2027 Nov 2028 6 14,539.500 Y Jan 2027 CFE-Airframe Long Lead: TR3, Bulkhead. 2022 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Sep 2022 Aug 2024 6 5,972.333 Y Jan 2020 CFE-Airframe Long Lead: TR3, Bulkhead. 2023 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Dec 2022 Jun 2024 4 11,095.000 Y Jan 2020 CFE-Airframe Long Lead: TR3, Bulkhead. 2024 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Dec 2023 Jun 2025 4 8,185.000 Y Jan 2023 CFE-Airframe Long Lead: TR3, Bulkhead. 2025 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Dec 2024 Jun 2026 4 9,818.000 Y Jan 2024 CFE-Airframe Long Lead: TR3, Bulkhead. 2026 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Dec 2025 Jun 2027 14 10,125.429 Y Jan 2025 CFE-Airframe Long Lead: TR3, Bulkhead. 2027 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Mar 2027 Sep 2028 13 9,415.750 Y Jan 2026 CFE-Airframe Long Lead: TR3, Bulkhead. 2028 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Oct 2027 Apr 2029 10 9,656.000 Y Jan 2027 CFE-Airframe Long Lead: TR3, Bulkhead. 2029 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Oct 2028 Apr 2030 9 9,857.591 Y Jan 2028 CFE-Airframe Long Lead: TR3, Bulkhead. 2030 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Oct 2029 Apr 2031 7 9,954.042 Y Jan 2029 Cost Elements O O C P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV 1.1.1) Airframe/CFE 1.1.1) Airframe/CFE 1.1.1) Airframe/CFE 1.1.1) Airframe/CFE 1.1.1) Airframe/CFE 1.1.1) Airframe/CFE 1.1.5) Engines / Eng Acc (†) 1.1.5) Engines / Eng Acc (†) 1.1.5) Engines / Eng Acc (†) 1.1.5) Engines / Eng Acc (†) 1.1.5) Engines / Eng Acc (†) 1.1.5) Engines / Eng Acc (†) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Dec 2022 Sep 2025 3 109,274.667 Y Qty (Each) RFP Issue Date Jan 2020 Advance Procurement LI 0147 - Joint Strike Fighter CV Navy UNCLASSIFIED Page 21 of 28 P-1 Line #2 Volume 1 - 31 === page 82 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Item Number / Title [DODIC]: 2 / Joint Strike Fighter-CV USMC FY Contractor and Location Method/Type or Funding Vehicle CFE-Airframe Long Lead: TR3, Bulkhead. 2031 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Oct 2030 Apr 2032 20 10,052.200 Y Jan 2030 Other GFE - APG85 Radar - Two year long lead AP 2026 Northrop Grumman / Baltimore SS / FFP NAVAIR Nov 2026 Oct 2028 14 1,846.929 Y Mar 2026 Other GFE - APG85 Radar - Two year long lead AP 2027 Northrop Grumman / Baltimore SS / FFP NAVAIR Feb 2027 Jan 2029 10 1,742.800 Y Jun 2026 Other GFE - APG85 Radar - Two year long lead AP 2028 Northrop Grumman / Baltimore SS / FFP NAVAIR Jan 2028 Dec 2029 9 1,750.364 Y Mar 2027 Other GFE - APG85 Radar - Two year long lead AP 2029 Northrop Grumman / Baltimore SS / FFP NAVAIR Jan 2029 Dec 2030 7 1,761.917 Y Mar 2028 Other GFE - APG85 Radar - Two year long lead AP 2030 Northrop Grumman / Baltimore SS / FFP NAVAIR Jan 2030 Dec 2031 20 1,773.750 Y Mar 2029 Other GFE - APG85 Radar - One year long lead AP 2026 Northrop Grumman / Baltimore SS / FFP NAVAIR Nov 2026 Oct 2028 14 6,500.000 Y Mar 2026 Other GFE - APG85 Radar - One year long lead AP 2027 Northrop Grumman / Baltimore SS / FFP NAVAIR Nov 2027 Oct 2029 13 6,732.846 Y Mar 2026 Other GFE - APG85 Radar - One year long lead AP 2028 Northrop Grumman / Baltimore SS / FFP NAVAIR Feb 2028 Jan 2030 10 6,971.200 Y Mar 2027 Other GFE - APG85 Radar - One year long lead AP 2029 Northrop Grumman / Baltimore SS / FFP NAVAIR Jan 2029 Dec 2030 9 7,001.545 Y Mar 2028 Other GFE - APG85 Radar - One year long lead AP 2030 Northrop Grumman / Baltimore SS / FFP NAVAIR Jan 2030 Dec 2031 7 7,047.667 Y Mar 2029 Other GFE - APG85 Radar - One year long lead AP 2031 Northrop Grumman / Baltimore SS / FFP NAVAIR Jan 2031 Dec 2032 20 7,095.100 Y Mar 2030 GFE-Engines Long Lead: MountSignal & IDMS Rings 2022 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2022 Aug 2023 6 2.333 Y Mar 2020 GFE-Engines Long Lead: MountSignal & IDMS Rings 2023 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2023 Aug 2024 4 2.750 Y Mar 2020 GFE-Engines Long Lead: MountSignal & IDMS Rings 2024 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2024 Aug 2025 4 11.500 Y Jan 2023 GFE-Engines Long Lead: MountSignal & IDMS Rings 2025 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2025 Aug 2026 4 11.750 Y Jan 2023 GFE-Engines Long Lead: MountSignal & IDMS Rings 2026 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2026 Aug 2027 14 13.000 Y Jan 2023 GFE-Engines Long Lead: MountSignal & IDMS Rings 2027 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2027 Aug 2028 13 13.000 Y Mar 2026 GFE-Engines Long Lead: MountSignal & IDMS Rings 2028 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2028 Aug 2029 10 24.000 Y Jan 2027 GFE-Engines Long Lead: MountSignal & IDMS Rings 2029 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2029 Aug 2030 9 26.000 Y Jan 2028 Cost Elements O O C P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV LI 0147 - Joint Strike Fighter CV Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 22 of 28 P-1 Line #2 Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date Volume 1 - 32 === page 83 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (†) O O C P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Method/Type or Funding Vehicle Item Number / Title [DODIC]: 2 / Joint Strike Fighter-CV USMC Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty RFP Issue Date FY Contractor and Location GFE-Engines Long Lead: MountSignal & IDMS Rings 2030 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2030 Aug 2031 7 28.000 Y Mar 2029 GFE-Engines Long Lead: MountSignal & IDMS Rings 2031 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2031 Aug 2032 20 30.000 Y Mar 2030 GFE-Engines Long Lead: IDMS Ring, Forward 2022 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2022 Aug 2023 6 3.667 Y Mar 2021 GFE-Engines Long Lead: IDMS Ring, Forward 2023 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Mar 2023 Sep 2024 4 4.250 Y Mar 2022 GFE-Engines Long Lead: IDMS Ring, Rear 2022 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2022 Aug 2023 6 3.333 Y Mar 2021 GFE-Engines Long Lead: IDMS Ring, Rear 2023 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Mar 2023 Sep 2024 4 4.250 Y Mar 2022 GFE-Engines Long Lead: Advance Acquisition Contracts 2022 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2022 Aug 2023 6 1,214.167 Y Mar 2021 GFE-Engines Long Lead: Advance Acquisition Contracts 2023 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Mar 2023 Sep 2024 4 2,260.750 Y Mar 2022 GFE-Engines Long Lead: Advance Acquisition Contracts 2024 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2024 Aug 2025 4 1,659.750 Y Mar 2023 GFE-Engines Long Lead: Advance Acquisition Contracts 2025 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2025 Aug 2026 4 1,689.750 Y Mar 2024 GFE-Engines Long Lead: Advance Acquisition Contracts 2026 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2026 Aug 2027 14 1,447.500 Y Mar 2025 GFE-Engines Long Lead: Advance Acquisition Contracts 2027 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2027 Aug 2028 13 1,393.923 Y Mar 2026 GFE-Engines Long Lead: Advance Acquisition Contracts 2028 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2028 Aug 2029 10 1,418.900 Y Mar 2027 GFE-Engines Long Lead: Advance Acquisition Contracts 2029 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2029 Aug 2030 9 1,447.000 Y Mar 2027 GFE-Engines Long Lead: Advance Acquisition Contracts 2030 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2030 Aug 2031 7 1,459.429 Y Mar 2027 GFE-Engines Long Lead: Advance Acquisition Contracts 2031 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2031 Aug 2032 20 1,472.050 Y Mar 2027 (Each) indicates the presence of a P-21 LI 0147 - Joint Strike Fighter CV Navy UNCLASSIFIED Page 23 of 28 P-1 Line #2 Volume 1 - 33 === page 84 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 2 / Joint Strike Fighter-CV USMC Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (22) 1 2022 NAVY 3 0 3 1 2023 NAVY 6 0 6 1 2024 NAVY 4 0 4 4 1 2025 NAVY 4 0 4 4 1 2026 NAVY 4 0 4 4 1 2027 NAVY 6 0 6 6 1.1.5) Engines / Eng Acc A - - - - - - - - - - - - - - - - - - - - - - 3 A - - - - - - - - - - - - - - - - - - 6 (26) 2 2022 NAVY 3 0 3 2 2023 NAVY 6 0 6 A - 2 2024 NAVY 4 0 4 4 2 2025 NAVY 4 0 4 4 2 2026 NAVY 4 0 4 4 2 2027 NAVY 6 0 6 - - - - - - - - - - - - - - - A - - - - - - - - - 1 1 - 1 - 0 - - - - - 6 6 O C T LI 0147 - Joint Strike Fighter CV Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 24 of 28 S E P O C T N O V D E C J A N F E B P-1 Line #2 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 34 === page 85 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 2 / Joint Strike Fighter-CV USMC Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (22) 1 2022 NAVY 3 0 3 - - - - - - - - - - - 1 2023 NAVY 6 0 6 - - - - - - - - - - - - - 1 2024 NAVY 4 0 4 A - - - - - - - - - - - - 1 2025 NAVY 4 0 4 A - - - - - - - - - 1 2026 NAVY 4 0 4 4 1 2027 NAVY 6 0 6 6 1.1.5) Engines / Eng Acc 1 1 - 2 1 2 0 - - - - - - - - - - - 1 - - - 1 - - - - - - 0 4 - - - - - - 4 (26) 2 2022 NAVY 3 3 0 2 2023 NAVY 6 0 6 2 2024 NAVY 4 0 4 2 2025 NAVY 4 0 4 2 2026 NAVY 4 0 4 2 2027 NAVY 6 0 6 0 - 1 1 1 A - 2 - 0 - - - - - - - - - - - - - - - A - - - - - - - - - - - - 1 1 - 1 - 1 - - 0 4 4 6 O C T LI 0147 - Joint Strike Fighter CV Navy 1 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 25 of 28 S E P O C T N O V D E C J A N F E B P-1 Line #2 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 35 === page 86 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 2 / Joint Strike Fighter-CV USMC Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (22) 1 2022 NAVY 3 3 0 1 2023 NAVY 6 6 0 1 2024 NAVY 4 0 4 - - - - - 1 2025 NAVY 4 0 4 - - - - - 1 2026 NAVY 4 0 4 A - - 1 2027 NAVY 6 0 6 A - - 1.1.5) Engines / Eng Acc 0 0 2 - - 2 - - - 2 - - - - - - - - 0 - - 2 - - - - - - - - - - - - - - - - 0 4 - - - - - - - - - - - - - - - - 6 (26) 2 2022 NAVY 3 3 0 0 2 2023 NAVY 6 6 0 0 2 2024 NAVY 4 4 0 2 2025 NAVY 4 0 4 2 2026 NAVY 4 0 4 2 2027 NAVY 6 0 6 0 - 1 1 1 0 A - O C T LI 0147 - Joint Strike Fighter CV Navy 1 N O V D E C J A N F E B M A R A P R M A Y - - - - - - - - - - - - - - - A - - - - - - - - - - - - - - - J U N J U L A U G UNCLASSIFIED Page 26 of 28 S E P O C T N O V D E C J A N F E B P-1 Line #2 M A R A P R M A Y J U N J U L A U G 2 S E P Volume 1 - 36 2 6 === page 87 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 2 / Joint Strike Fighter-CV USMC Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (22) 1 2022 NAVY 3 3 0 0 1 2023 NAVY 6 6 0 0 1 2024 NAVY 4 4 0 0 1 2025 NAVY 4 4 0 1 2026 NAVY 4 0 4 - - - - - 2 2 1 2027 NAVY 6 0 6 - - - - - 1 1 1.1.5) Engines / Eng Acc 0 0 1 1 1 1 0 (26) 2 2022 NAVY 3 3 0 0 2 2023 NAVY 6 6 0 0 2 2024 NAVY 4 4 0 0 2 2025 NAVY 4 4 0 2 2026 NAVY 4 2 2 2 2027 NAVY 6 0 6 0 2 O C T LI 0147 - Joint Strike Fighter CV Navy 0 - 1 N O V 1 D E C 1 J A N 1 F E B 1 M A R 1 A P R 0 M A Y J U N J U L A U G UNCLASSIFIED Page 27 of 28 S E P O C T N O V D E C J A N F E B P-1 Line #2 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 37 === page 88 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Item Number / Title [DODIC]: 2 / Joint Strike Fighter-CV USMC Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 LOCKHEED MARTIN - FT WORTH 12 12 30 8 6 24 30 24 3 27 30 2 UNITED TECH, PRATT & WHITNEY - EAST HARTFORD, CT 12 12 30 8 4 17 21 0 6 17 23 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0147 - Joint Strike Fighter CV Navy UNCLASSIFIED Page 28 of 28 P-1 Line #2 Volume 1 - 38 === page 89 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat Aircraft P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Program Elements for Code B Items: 0204146N Other Related Program Elements: 0204146M Line Item MDAP/MAIS Code: 198 Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Gross/Weapon System Cost ($ in Millions) 3,004.061 196.634 401.596 651.081 - 651.081 596.362 622.914 644.113 779.950 801.921 7,698.632 Net Procurement (P-1) ($ in Millions) 3,004.061 196.634 401.596 651.081 - 651.081 596.362 622.914 644.113 779.950 801.921 7,698.632 Total Obligation Authority ($ in Millions) 3,004.061 196.634 401.596 651.081 - 651.081 596.362 622.914 644.113 779.950 801.921 7,698.632 Description: Joint Strike Fighter (JSF) program is developing and fielding a family of aircraft that meets the needs of DoW and allies, with the F-35A Conventional Take Off and Landing (CTOL) variant, F-35B Short Take-Off and Vertical Landing (STOVL) variant and F-35C Carrier Variant (CV). The aircraft will have optimum commonality among three variants to minimize life cycle costs. This is a joint program with no executive service. Service Acquisition Executive (SAE) authority alternates between Department of Navy (DON) and Department of Air Force (DAF) and currently resides with the Department of the Air Force. The F-35 is next generation of strike fighters to command and maintain global air superiority. FY 2027 Advance procurement funding will support Airframe and Engine Termination Liability, and long-lead parts and materials necessary to protect delivery schedule. FY 2027 AP procures Other GFE APG-85 Radar for U.S. Aircraft. This long lead end item requires two years/two phases of AP to produce a complete end item to be integrated into the Aircraft. Notes: (1) Prior to FY2011, F-35B was reported against Budget Line Item 0147. The F-35B now reports under Budget Line Item 0152. CY Advance Procurement for FY2010 F-35B aircraft was included in the FY2010 F-35C budget. The Advance Procurement Credit for FY2010 F-35B aircraft was included in the FY2011 F-35B budget LI 0147 - Joint Strike Fighter CV Navy UNCLASSIFIED Page 1 of 8 P-1 Line #3 Volume 1 - 39 === page 90 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat Aircraft P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Program Elements for Code B Items: 0204146N Other Related Program Elements: 0204146M Line Item MDAP/MAIS Code: 198 Exhibits Schedule Exhibit Type Title* ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-10 1 / Joint Strike Fighter-CV USN 183 / 2,867.993 13 / 150.556 8 / 122.536 2 / 405.431 - / - 2 / 405.431 P-10 2 / Joint Strike Fighter-CV USMC 13 / 136.068 4 / 46.078 4 / 279.060 6 / 245.650 - / - 6 / 245.650 P-40 Total Gross/Weapon System Cost 196 / 3,004.061 17 / 196.634 12 / 401.596 8 / 651.081 - / - 8 / 651.081 *Title represents the P-10 Title for Advance Procurement. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY2027 budget requests Advance Procurement for long lead materials to support Airframe and Engine long-lead parts necessary to protect delivery schedules. Full funding for long lead end items requesting advance procurement is included in the budget submission. FY27 budget exhibits include funding to support the procurement of Other GFE - APG-85 radar to replace the APG-81 radar in United States versions of F-35 aircraft. Due to extra-long lead times, the APG-85 Requires advance procurement for long-lead materials and radar completion for on-time install into the aircraft. The first year of APG-85 adv procurement procures radar long-lead materials and the second year of AP continues material buys, to manufacture and deliver the completed APG-85 for integration onto US-only aircraft. LI 0147 - Joint Strike Fighter CV Navy UNCLASSIFIED Page 2 of 8 P-1 Line #3 Volume 1 - 40 === page 91 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 First System (2027) Award Date: December 2026 First System (2027) Completion Date: June 2028 Production Leadtime Joint Strike Fighter-CV USN P-5 Number / Title: 1 / Joint Strike Fighter-CV USN Interval Between Systems: 1 Months Prior Years (Months) FY 2025 (Each) 183 When Required Prior Years (Months) FY 2026 (Each) Quantity Cost Elements Date: April 2026 (Each) 13 FY 2025 ($ M) FY 2027 (Each) 8 FY 2026 ($ M) 2 FY 2027 ($ M) ($ M) CFE CFE - Airframe Long Lead (1) (†) 0 1,937.057 - - - 18 307.830 82.353 41.690 For FY21 Economic Order Quantity (Lot 15) 0 98.077 - - - For FY22 Economic Order Quantity (Lot 16) 0 90.084 - - - For FY23 Economic Order Quantity (Lot 17) 0 86.939 - - 2,519.987 82.353 41.690 188.315 CFE- Airframe Long Lead: TR3, Bulkhead Total: CFE 188.315 - GFE Other GFE - APG85 Radar - Two year long lead AP (2) (†) 36 - 21.033 20.316 34.856 Other GFE - APG85 Radar - One year long lead AP (3) (†) 18 - - 51.767 154.121 GFE - Engines Long Lead (4) GFE-Engines Long Lead: Mount-Signal & IDMS Rings GFE-Engines Long Lead: IDMS Ring, Forward GFE-Engines Long Lead: IDMS Ring, Rear (†) (†) (†) GFE-Engines Long Lead: Advance Acquisition Contracts (†) Congressional Rescission Enacted 0 265.537 - - - 23 0.126 0.041 0.078 0.260 23 0.196 0.060 - - 23 0.191 0.060 - - 81.956 21.923 8.685 27.879 - 25.086 - - (5) 23 (6) Total: GFE Total Advance Procurement/Obligation Authority LI 0147 - Joint Strike Fighter CV Navy 0 348.006 68.203 80.846 217.116 2,867.993 150.556 122.536 405.431 UNCLASSIFIED Page 3 of 8 P-1 Line #3 Volume 1 - 41 === page 92 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Date: April 2026 P-5 Number / Title: 1 / Joint Strike Fighter-CV USN FY 2027 Production Leadtime QPA Cost Elements Unit Cost (Months) (Each) ($ K) Contract Forecast Date 2027 Qty For FY (Each) Total Cost Request ($ M) CFE CFE - Airframe Long Lead 0 CFE- Airframe Long Lead: TR3, Bulkhead (1) (†) 1 18 9,415.750 Dec 2026 20 188.315 For FY21 Economic Order Quantity (Lot 15) 0 - For FY22 Economic Order Quantity (Lot 16) 0 - For FY23 Economic Order Quantity (Lot 17) 0 - Total: CFE 188.315 GFE Other GFE - APG85 Radar - Two year long lead AP (2) (†) 1 36 1,742.800 Feb 2027 20 34.856 Other GFE - APG85 Radar - One year long lead AP (3) (†) 1 18 7,706.050 Nov 2027 20 154.121 GFE - Engines Long Lead (4) 0 GFE-Engines Long Lead: Mount-Signal & IDMS Rings GFE-Engines Long Lead: IDMS Ring, Forward GFE-Engines Long Lead: IDMS Ring, Rear (†) (†) GFE-Engines Long Lead: Advance Acquisition Contracts Congressional Rescission Enacted 2 (†) (6) (5) (†) 18 13.000 Feb 2027 20 0.260 0 - 0 - 1 18 1,393.950 Feb 2027 20 27.879 0 - Total: GFE 217.116 Total Advance Procurement/Obligation Authority 405.431 Description: Advance procurement funding will support Airframe and Engine Termination Liability, and long-lead parts and materials necessary to protect delivery schedule of FY2028 and FY2029 JSF aircraft buy. Aircraft procured with AP/long lead deliver one year earlier than aircraft procured without AP, providing critical 12 month time savings for delivery of aircraft. (†) indicates the presence of Contract Data presented in the associated P-5 Item's P-5a exhibit. Footnotes: (1) CFE-Airframe Long Lead: AP funding will be used for the following Air Vehicle suppliers/systems based on the lead time associated with the material(s): TR3 Components (Integrated Core Processor, Aircraft Memory System, Panoramic Cockpit Display); Bulkhead forgings; Collins Landing Gear; BAE Electronic Warfare components; IAI Outer Wing Box; BAE Aft Fuselage components; Northrop Grumman Center Fuselage, Communication, Navigation & Identification (CNI), Block 4 components, EW Drop 13, and Radar components; ATK Wing Skins; Curtiss-Wright Controls LEFDS; Ball Aerospace CNI Integrated Body Apertures; Heroux-Devtek FODUS; Fokker Flaperons; Arkwin Industries Actuators; and Leonardo Wing. LI 0147 - Joint Strike Fighter CV Navy UNCLASSIFIED Page 4 of 8 P-1 Line #3 Volume 1 - 42 === page 93 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Date: April 2026 P-5 Number / Title: 1 / Joint Strike Fighter-CV USN (2) GFE-APG85 Radar Two year Lead Time: AP is required to support Other GFE APG-85 Radar long-lead end item and electronic warfare integration. This two-year AP supports suppliers/systems based on lead time associated with the materials: microcircuits, connectors, magnet assembly, transceiver kits, inductor chips, forward housing assembly, signal processors, radiator structures, amplifiers, and chassis assembly. (3) GFE-APG85 Radar One Year Lead Time: The budget request includes two years/two phases of advance procurement to procure the APG-85 radar which replaces the existing APG-81 radar in United States versions of F-35 aircraft. The FY27 one year lead time AP cost has been adjusted based on the prior two year lead time AP cost to capture the total AP requirement. (4) (5) GFE-Engines Long Lead: starting in FY22, this is broken down into more details. GFE-Engines Long Lead: Advance Acquisition Contracts (AAC) will be awarded for long-lead items on a termination liability basis to protect delivery schedule. AP funding will be used towards the following Propulsion suppliers/systems based on lead time associated with material(s): Engine Hardware (High Pressure Turbine (HPT), Low Pressure Turbine (LPT), Turbine Exhaust, Compressor Rotors and Stators, Nozzle, Liners and Seals) and Collins Inlet Debris Monitor Signal Conditioning Units (IDMS SCUs). (6) Cost Element: Congressional Rescission Enacted captures rescission to FY2025 ($25.086M) F-35C Advanced Procurement due to quantity reduction in FY2026. LI 0147 - Joint Strike Fighter CV Navy UNCLASSIFIED Page 5 of 8 P-1 Line #3 Volume 1 - 43 === page 94 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 First System (2027) Award Date: December 2026 P-5 Number / Title: 2 / Joint Strike Fighter-CV USMC First System (2027) Completion Date: June 2028 Production Leadtime Joint Strike Fighter-CV USMC Interval Between Systems: 1 Months Prior Years (Months) FY 2025 (Each) FY 2026 (Each) Quantity When Required Prior Years (Months) (Each) 4 FY 2025 ($ M) FY 2027 (Each) 13 Cost Elements Date: April 2026 4 FY 2026 ($ M) 6 FY 2027 ($ M) ($ M) CFE CFE-Airframe Long Lead: TR3, Bulkhead. (7) (†) 18 Total: CFE 112.954 39.272 141.756 122.405 112.954 39.272 141.756 122.405 GFE Other GFE - APG85 Radar - Two year long lead AP (8) (†) 36 - - 25.857 17.428 Other GFE - APG85 Radar - One year long lead AP (9) (†) 18 - - 91.000 87.527 (†) 23 0.071 0.047 0.182 0.169 23 0.039 - - - 23 0.037 - - - 22.967 6.759 20.265 18.121 GFE-Engines Long Lead: Mount-Signal & IDMS Rings GFE-Engines Long Lead: IDMS Ring, Forward GFE-Engines Long Lead: IDMS Ring, Rear (†) (†) GFE-Engines Long Lead: Advance Acquisition Contracts (10) (†) 23 Total: GFE 23.114 6.806 137.304 123.245 Total Advance Procurement/Obligation Authority 136.068 46.078 279.060 245.650 LI 0147 - Joint Strike Fighter CV Navy UNCLASSIFIED Page 6 of 8 P-1 Line #3 Volume 1 - 44 === page 95 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Date: April 2026 P-5 Number / Title: 2 / Joint Strike Fighter-CV USMC FY 2027 Production Leadtime QPA Cost Elements Unit Cost (Months) (Each) ($ K) Contract Forecast Date 2027 Qty For FY (Each) Total Cost Request ($ M) CFE CFE-Airframe Long Lead: TR3, Bulkhead. (7) (†) 0 18 9,415.750 Mar 2027 122.405 13 Total: CFE 122.405 GFE Other GFE - APG85 Radar - Two year long lead AP (8) (†) 1 36 1,742.800 Feb 2027 10 17.428 Other GFE - APG85 Radar - One year long lead AP (9) (†) 1 24 6,732.846 Nov 2027 13 87.527 (†) 2 18 13.000 Feb 2027 13 0.169 GFE-Engines Long Lead: Mount-Signal & IDMS Rings GFE-Engines Long Lead: IDMS Ring, Forward GFE-Engines Long Lead: IDMS Ring, Rear (†) (†) GFE-Engines Long Lead: Advance Acquisition Contracts (10) (†) 1 - 1 - 1 18 1,393.923 Feb 2027 18.121 13 Total: GFE 123.245 Total Advance Procurement/Obligation Authority 245.650 Description: Advance procurement funding will support Airframe and Engine Termination Liability, and long-lead parts and materials necessary to protect delivery schedule of FY2028 and FY2029 JSF aircraft buy. Aircraft procured with AP/long lead deliver one year earlier than aircraft procured without AP, providing critical 12 month time savings for delivery of aircraft. (†) indicates the presence of Contract Data presented in the associated P-5 Item's P-5a exhibit. Footnotes: (7) CFE-Airframe Long Lead: AP funding will be used towards the following Air Vehicle suppliers/systems based on the lead time associated with the material(s): TR3 Components (Integrated Core Processor, Aircraft Memory System, Panoramic Cockpit Display); Bulkhead forgings; Collins Landing Gear; BAE Electronic Warfare components; IAI Outer Wing Box; BAE Aft Fuselage components; Northrop Grumman Center Fuselage, Communication, Navigation & Identification (CNI), and Radar components; ATK Wing Skins; Curtiss-Wright Controls LEFDS; Ball Aerospace CNI Integrated Body Apertures; Heroux-Devtek FODUS; Fokker Flaperons; Arkwin Industries Actuators; and Leonardo Wing. (8) GFE-APG85 Radar Two Year Lead Time: AP required to support Other GFE APG-85 Radar long-lead end item and electronic warfare integration. This two-year AP supports suppliers/systems based on lead time associated with the materials: microcircuits, connectors, magnet assembly, transceiver kits, inductor chips, forward housing assembly, signal processors, radiator structures, amplifiers, and chassis assembly. (9) GFE-APG85 Radar One Year Lead Time: The budget request includes two years/two phases of advance procurement to procure the APG-85 radar which replaces the existing APG-81 radar in United States versions of F-35 aircraft. The FY27 one year lead time AP cost has been adjusted based on the prior two year lead time AP cost to capture the total AP requirement. LI 0147 - Joint Strike Fighter CV Navy UNCLASSIFIED Page 7 of 8 P-1 Line #3 Volume 1 - 45 === page 96 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 P-1 Line Item Number / Title: 0147 / Joint Strike Fighter CV Date: April 2026 P-5 Number / Title: 2 / Joint Strike Fighter-CV USMC (10) GFE-Engines Long Lead: Advance Acquisition Contracts (AAC) will be awarded for long-lead items on a termination liability basis to protect delivery schedule. AP funding will be used towards the following Propulsion suppliers/systems based on lead time associated with material(s): Engine Hardware (High Pressure Turbine (HPT), Low Pressure Turbine (LPT), Turbine Exhaust, Compressor Rotors and Stators, Nozzle, Liners and Seals) and Collins Inlet Debris Monitor Signal Conditioning Units (IDMS SCUs). LI 0147 - Joint Strike Fighter CV Navy UNCLASSIFIED Page 8 of 8 P-1 Line #3 Volume 1 - 46 === page 97 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 0152 / JSF STOVL Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat Aircraft ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: 0204146M Other Related Program Elements: 0204146N Line Item MDAP/MAIS Code: 198 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 177 13 11 - - - 10 9 6 6 9 241 28,522.308 2,130.050 1,940.880 180.848 1,937.647 1,837.552 1,219.785 1,141.813 3,012.951 41,923.834 0.000 180.848 FY 2029 To FY 2031 Complete FY 2030 Total Less PY Advance Procurement ($ in Millions) 3,072.691 158.363 153.567 118.485 - 118.485 73.359 203.474 136.592 138.355 232.792 4,287.678 Net Procurement (P-1) ($ in Millions) 25,449.617 1,971.687 1,787.313 62.363 0.000 62.363 1,864.288 1,634.078 1,083.193 1,003.458 2,780.159 37,636.156 Plus CY Advance Procurement ($ in Millions) 3,231.054 169.389 113.744 77.963 - 77.963 198.291 136.662 145.521 215.054 Total Obligation Authority ($ in Millions) 28,680.671 2,141.076 1,901.057 140.326 0.000 140.326 2,062.579 1,770.740 1,228.714 1,218.512 2,780.159 4,287.678 41,923.834 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 201.029 253.466 190.600 199.990 172.895 63.129 6,726.396 7,954.226 Flyaway Unit Cost ($ in Thousands) 135,748.288 - 124,749.077 140,867.545 146.721 - - 146.721 - 142,071.000 168,713.444 170,702.000 150,870.500 176,642.222 140,147.548 Gross/Weapon System Unit Cost ($ in Thousands) 161,142.983 163,850.000 176,443.636 - - - 193,764.700 204,172.444 203,297.500 190,302.167 334,772.333 173,957.817 Description: This is a Commandant of the Marine Corps (CMC) Force Design program. Joint Strike Fighter (JSF) program will enhance and field a family of aircraft that meets the needs of DoW and allies with three aircraft variants including: the F-35A Conventional Take Off and Landing (CTOL) variant, the F-35B Short Take-Off and Vertical Landing variant, and the F-35C Carrier Variant (CV) delivering commonality among the three variants to minimize life cycle costs. This is a joint program with no executive service. Service Acquisition Executive (SAE) authority alternates between the Department of the Navy (DON) and the Department of the Air Force (DAF) and currently resides with the DAF. The F-35s are the next generation of strike fighters and provide increased aero-performance, stealth signature and countermeasures. Its advanced avionics, data links and adverse weather precision targeting incorporates the latest technology available. The F-35 has increased range with internal fuel and can employ superior weaponry over existing aircraft. The highly supportable, affordable, state of the art aircraft commands and maintains global air superiority. The production cost and quantities are interdependent due to sole source air vehicle and propulsion contracts. DAF regular procurement commenced in FY07, DON regular procurement commenced in FY08. For the Marine Corps, the F-35B combines precision weapons and multi-spectral sensors with the expeditionary responsiveness of a Short Takeoff and Vertical Landing (STOVL) fighter-attack platform. The Marine Corps currently has seven F-35B operational squadrons and will stand up an additional five squadrons. Notes: (1) FY 2010 and prior quantity and funding for F-35B and F-35C were reported under same Budget Line Item 0147. Result is 29 F-35B aircraft (6 - FY08; 7 - FY09; and 16 - FY10) are included in the BLI 0147 Prior Year Column. The F-35B Program of Record is 280, but reported as 241 in BLI 0152 due to the combination of this PY calculation and in conjunction with 10 a/c funded with PB27 mandatory funding. (2) Initial Operational Capability (IOC) occurred in July 2015 and Full Rate Production (FRP) decision occurred March 2024 after completion of Initial Operational Test and Evaluation (IOT&E). The FY 2027 request for Joint Strike Fighter - STOVL includes $140,326 thousand of discretionary and $1,935,380 thousand of mandatory (reconciliation) for a total of $2,075,706 thousand. FY 2027 total funding collectively supports the procurement of 10 F-35Bs and supporting non-recurring flyaway and support efforts. The discretionary funds provide for recurring flyaway from PY AP and support efforts. The mandatory funds provide for the procurement of 10 F-35B, non-recurring flyaway, and support efforts. LI 0152 - JSF STOVL Navy UNCLASSIFIED Page 1 of 16 P-1 Line #4 Volume 1 - 47 === page 98 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 0152 / JSF STOVL Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat Aircraft ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: 0204146M Other Related Program Elements: 0204146N Line Item MDAP/MAIS Code: 198 Exhibits Schedule Exhibit Type Title* P-5 1 / Joint Strike Fighter - STOVL P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 177 / 28,522.308 13 / 2,130.050 11 / 1,940.880 - / 180.848 - / 0.000 - / 180.848 177 / 28,522.308 13 / 2,130.050 11 / 1,940.880 - / 180.848 - / 0.000 - / 180.848 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: BASIS FOR FY 2027 BUDGET REQUEST: The FY 2027 budget provides funding for non-recurring and ancillary mission equipment to support delivery. The budget request also supports the advanced procurement and support requirements for squadron standup and associated training and logistical requirements. Non-recurring flyaway costs for FY 2027 include costs for tooling required to support full production capacity for hardware associated with delivering Block 4 capabilities. Non-recurring includes funding to address Diminishing Manufacturing Sources (DMS) which include costs to manage DMS issues, procurement of bridge or life-of-type buys, and if cost-benefit analysis supports non-recurring engineering to implement DMS redesigns within the performance envelope to the production line. Other non-recurring costs include but are not limited to chase support for government acceptance flights, Engineering Change Proposal Integration Contracts, systems engineering for production line efforts and production readiness reviews to address program risks and cost reduction initiatives. Support costs in FY 2027 include costs that are fixed in nature and costs that fluctuate based on site and squadron stand-ups. FY 2027 support cost request includes equipment for First Aircraft Arrival (MCAS Cherry Point VMFA-231) Squadron completion (MCAS Beaufort VMFA-224 and MCAS Cherry Point VMFA-231). Intermediate Level maintenance capability is also included in peculiar ground support equipment and this capability is specific to the Department of the Navy. The Department will continue implementing the strategy to transition the Autonomic Logistics Information System (ALIS) to the F-35 Operational Data Integrated Network (ODIN), a modern F-35 logistics and information system. Hardware being procured is compatible with both ALIS and ODIN software. Depot activation efforts continue in FY 2027 increasing repair capacity necessary for long-term sustainment of F-35 aircraft. FY 2027 request includes equipment and material to support establishment of depot repair capability, cyber compliance and capacity for components/sub-components across all US Depots, support equipment for air vehicle modification dock expansion at Fleet Readiness Center Southeast, and Block 4 depot repair capability. FY 2027 includes funding for propulsion depot standup to include module repair activities to meet expanding fleet repair requirements. LI 0152 - JSF STOVL Navy UNCLASSIFIED Page 2 of 16 P-1 Line #4 Volume 1 - 48 === page 99 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0152 / JSF STOVL Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Joint Strike Fighter - STOVL MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC - - 177 13 11 28,522.308 2,130.050 1,940.880 180.848 FY 2027 Total - 0.000 180.848 Less PY Advance Procurement ($ in Millions) 3,072.691 158.363 153.567 118.485 - 118.485 Net Procurement (P-1) ($ in Millions) 25,449.617 1,971.687 1,787.313 62.363 0.000 62.363 Plus CY Advance Procurement ($ in Millions) 3,231.054 169.389 113.744 77.963 - 77.963 Total Obligation Authority ($ in Millions) 28,680.671 2,141.076 1,901.057 140.326 0.000 140.326 146.721 - 146.721 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) 161,142.983 201.029 253.466 163,850.000 176,443.636 - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost (†) 1.1.1) Airframe/CFE (1) 1.1.2) CFE Electronics (2) 1.1.3) Other GFE 75,766.141 177 13,410.607 67,559.231 13 878.270 73,642.364 11 810.066 - - 42.830 - - - - - 42.830 14,003.418 177 2,478.605 11,828.846 13 153.775 11,773.727 11 129.511 - - 8.137 - - - - - 8.137 502.308 13 6.530 116.636 11 1.283 - - 0.069 - - - - - 0.069 - - - - - - 45.500 - - - - - 45.500 (3) 1.1.4) Other GFE APG-85 Radar (4) 1.1.5) Engines/Eng Acc (†) (5) 1.1.6) Rec Flyaway ECO (6) - - - - - - - - 31,064.215 177 5,498.366 35,567.692 13 462.380 35,411.455 11 389.526 - - 21.949 - - - - - 21.949 2,236.910 177 395.933 123.077 13 1.600 2,418.909 11 26.608 - - - - - - - - - - - 21,783.511 - - 1,502.555 - - 1,356.994 - - - - - - - - - 1,324.412 - - 28.187 - - 97.246 - - - - - - - - - - - 919.524 - - 90.996 - - 95.303 - - - - - - - - - - - 2,243.936 - - 119.183 - - 192.549 - - - - - - - - - - - 24,027.447 - - 1,621.738 - - 1,549.543 - - - - - - - Subtotal: Recurring Cost 118.485 118.485 Non Recurring Cost 1.2.1) Non- Recur Cost (7) 1.2.2) Ancillary Equip (8) Subtotal: Non Recurring Cost Subtotal: Flyaway Cost 118.485 118.485 Support Cost LI 0152 - JSF STOVL Navy UNCLASSIFIED Page 3 of 16 P-1 Line #4 Volume 1 - 49 === page 100 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0152 / JSF STOVL Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Joint Strike Fighter - STOVL MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) Qty (Each) - - 989.482 - - (10) - - 275.938 - - - - 393.315 - - - - 321.401 - - - - 75.576 - - - 116.141 - - - (17) 2.10) Depot Standup 2.2) Engine PGSE 2.3) Avionics PGSE 2.4) Pec Trng Eq (11) (12) 2.5) Full Mission Simulators (13) 2.6) ODIN/Tech Data (previously ALIS) 2.7) Other ILS (14) (15) 2.8) Prod Eng Supt (16) 2.9) Fixed JPO Support 2.11) Depot Standup Software (18) 2.12) Depot Standup Air Vehicle (19) 2.13) Depot Standup Propulsion (20) Subtotal: Support Cost Gross/Weapon System Cost (†) Unit Cost ($ M) (9) 2.1) Airframe PGSE FY 2026 Total Cost ($ K) Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - 71.143 - - - - - - - - - - - - 29.512 - - - - - - - - - 17.565 - - 6.143 - - - - - - - - - - - - - - - - - - - - - - - 28.565 - - 17.544 - - - - - - - - - - - 11.387 - - 21.722 - - - - - - - - - 611.822 - - 17.280 - - 29.576 - - - - - - - - - - 542.778 - - 9.760 - - 21.689 - - - - - - - - - - - 127.147 - - 102.481 - - 67.648 - - 62.363 - - - - - 62.363 - - 418.450 - - - - - - - - - - - - - - - - - 47.756 - - 7.530 - - 22.516 - - - - - - - - - - - 349.026 - - 89.811 - - 95.557 - - - - - - - - - - - 226.029 - - 58.440 - - 8.287 - - - - - - - - - - - 4,494.861 - - 508.312 - - 391.337 - - 62.363 - - - - - 62.363 177 28,522.308 163,850.000 11 1,940.880 - - 180.848 - - 0.000 - - 180.848 161,142.983 13 165.493 FY 2027 Base Total Cost 2,130.050 176,443.636 indicates the presence of a P-5a Footnotes: (1) Airframe Unit Recurring Flyaway (URF) price is directly affected by a number of cost pressures including the United States Air Force (USAF) and Department of the Navy (DON), Partner, and Foreign Military Sales (FMS) quantity profiles. FY 2027 includes $42,830 thousand discretionary funding from PY AP combined with the reconciliation funding for ten F-35Bs for $732,924 thousand. (2) CFE Electronics (URF) price is directly affected by a number of cost pressures including the (USAF), (DON), Partner, and FMS quantity profiles. FY 2027 includes $8,137 thousand discretionary funding from PY AP combined with the reconciliation funding for ten F-35Bs for $142,569 thousand. (3) Other Government Furnished Equipment (GFE) captures non-prime contract URF costs, such as Cost Reduction Initiatives and GFE Workload efforts. FY 2027 includes $69 thousand discretionary funding from PY AP combined with the reconciliation funding for ten F-35Bs for $1,208 thousand. LI 0152 - JSF STOVL Navy UNCLASSIFIED Page 4 of 16 P-1 Line #4 Volume 1 - 50 === page 101 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 P-1 Line Item Number / Title: 0152 / JSF STOVL ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Joint Strike Fighter - STOVL MDAP/MAIS Code: (4) FY27 continues the procurement of the APG-85 radar's which replaces the existing APG-81 radar in United States versions of F-35 aircraft. APG-85 just in time advance procurement for long lead materials is required two years in advance due to APG-85 manufacturing timelines and F-35 aircraft lot insertion schedules. See Adv Procurement P-40 and P-10 for additional details. FY27 accounts for Prior Year Advance procurement and Budget Year funding. FY 2027 includes $45,500 thousand discretionary funding from PY AP combined with the reconciliation funding for ten F-35Bs for $42,631 thousand. (5) Engines Unit Recurring Flyaway (URF) price is directly affected by a number of cost pressures including the (USAF) and (DON), Partner, and FMS quantity profiles. FY 2027 includes $21,949 thousand discretionary funding from PY AP combined with the reconciliation funding for ten F-35Bs for $372,380 thousand. (6) Engineering Change Order (ECO) URF price is directly affected by a number of cost pressures including the (USAF) and (DON) quantity profiles. FY 2027 does not include any discretionary funding, but does include reconciliation funding for ten F-35Bs for $26,746 thousand. (7) NRE: Non-recurring Costs include items such as USMC share of Production Non-Recurring Tooling necessary to capacitize the supply chain to build new Block 4 capabilities and maintain planned production schedules. Funding includes requirements for Diminishing Manufacturing Sources (DMS) "Life-of-type" part buys, management, and non-recurring redesign engineering, acceptance chase support, Engineering Change Proposal Integration Contracts, and technical assistance. This cost element includes variable (aircraft quantity driven) and fixed costs. NRE execution timelines are directly influenced by the aircraft and engine production Lot negotiation pricing and award timelines. FY27 costs are primarily driven by DMS Aircraft redesign increases for TR-3 Integrated Core Processor and Panoramic Cockpit Display Electronic Unit requirements. Additionally, funding accounts for production line tooling increases, canopy tooling to enable the manufacturer to up keep with the production line. Funding also accounts for Engineering Change Proposal Integration to help accelerate 8,000-flight-hour redesigns, as well as an expected increase in the need for design changes and improvements driven by discoveries from the growing fleet and the increased population of older aircraft, to include corrosion findings. FY 2027 does not include any discretionary funding, but does include reconciliation funding for $197,790 thousand. (8) Ancillary Equip: Equipment required to deliver fully mission capable aircraft. Costs are affected by pilot turnover, equipment inventory, aircraft quantities, mission capabilities and aircraft configurations. Equipment and Hardware to includes Launcher Kits, Bomb Racks, Missile Launchers, Adapter Kits, Pylon Kits, Rail Launchers, Gun Pods, Magazines, Umbilical Cables, Pilot Flight Equipment (PFE), Helmet Mounted Displays (HMD), and Portable Memory Devices (PMD). FY27 funds transition to Organic Light Emitting Diode (OLED) helmets and is a cost driver due to a helmet requirement significant increase and overall pilot throughput. Additionally, the TR3 Aircraft Memory System cartridges transition is expected to increase unit pilot furnished equipment. FY 2027 does not include any discretionary funding, but does include reconciliation funding for $75,093 thousand. (9) Airframe Peculiar Ground Support Equipment (PGSE): This element provides the projected costs for the procurement and delivery of airframe F-35 SE for On- and Off-Equipment maintenance tasks at the Organizational level. On-equipment maintenance supports on-aircraft sortie generation tasks, to include inspections, servicing, handling, weapons/stores loading, launch and recovery, aircraft turn around, component removal and replacement, and repairs by operations unit personnel. Off-equipment maintenance includes those tasks that cannot be effectively accomplished on the aircraft or end item. Organizational off-equipment maintenance may require the removal of the component to a maintenance facility. Off-equipment maintenance includes specific support equipment repair and servicing tasks. FY27 does not include any discretionary funding, and the reconciliation funding is for $26,466 thousand. (10) Engine PGSE: This element provides the projected costs for the procurement and delivery of propulsion F-35 SE for On- and Off-Equipment maintenance tasks at the Organizational level. On-equipment maintenance supports on-aircraft sortie generation tasks, to include inspections, servicing, handling, weapons/stores loading, launch and recovery, aircraft turn around, component removal and replacement, and repairs by operations unit personnel. Off-equipment maintenance includes those tasks that cannot be effectively accomplished on the aircraft or end item. Organizational off-equipment maintenance may require the removal of the component to a maintenance facility. Off-equipment maintenance includes specific support equipment repair and servicing tasks. FY27 does not include any discretionary funding, and the reconciliation funding is for $4,014 thousand. (11) Avionics PGSE: This element provides the projected costs for the procurement and delivery of avionics F-35 SE for On- and Off-Equipment maintenance tasks at the Organizational level. On-equipment maintenance supports on-aircraft sortie generation tasks, to include inspections, servicing, handling, weapons/stores loading, launch and recovery, aircraft turn around, component removal and replacement, and repairs by operations unit personnel. Off-equipment maintenance includes those tasks that cannot be effectively accomplished on the aircraft or end item. Organizational off-equipment maintenance may require the removal of the component to a maintenance facility. Off-equipment maintenance includes specific support equipment repair and servicing tasks. FY27 does not include any discretionary funding, and the reconciliation funding is for $2,200 thousand. (12) Peculiar Training Equipment: Costs driven by requirement to support training equipment at MCAS Miramar-Pilot EML (12-seat), TIS LLE (Pilot/Mx Classrooms), Mx EML/ICW (8-seat). FY27 does not include any discretionary funding, and the reconciliation funding is for $35,684 thousand. (13) Full Mission Sims (FMS): There is no FY27 funding allocated for the procurement of initial Pilot Training Devices. These Full Mission Simulators were previously identified as a requirement to support the USMC bed down plan and meet necessary pilot throughput. (14) ODIN/MPE/PUBS/TECH DATA: Costs support Autonomic Logistics Information System (ALIS)/Operational Data Integrated Network (ODIN) Equipment, Mission Planning Environment (MPE) Equipment, site activation support. The program will continue to procure and field Mission Planning Enterprise (MPE) Next-Gen Mission Planning (NGMP) hardware/software, to fully replace obsolete Ground Data LI 0152 - JSF STOVL Navy UNCLASSIFIED Page 5 of 16 P-1 Line #4 Volume 1 - 51 === page 102 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 P-1 Line Item Number / Title: 0152 / JSF STOVL ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Joint Strike Fighter - STOVL MDAP/MAIS Code: Receptacles (GRDs) and server racks (SOU-C) with MPE Squadron Kits (MSKs), Inline field encryption devices (IFEDs) and cross-domain solutions (CDSs), and will continue to procure equipment for the Joint Reprogramming Enterprise U.S. Reprogramming Lab (USRL) to maintain air-system alignment and provide the latest rapid reprogramming capabilities. Year to year changes is influenced by the number of sites and squadrons. FY27 decrease due to reduced requirements for PMA, SCM/OOBMS laptops SOU-U, barcode readers, DVD/SSD drives, backup HDDs, and Mx Sys SHIPS (ODIN) OBK-U, as well as partial kit procurement for LHD-7 USS Iwo Jima, LHD-8 USS Makin Island, and LHA-7 USS Tripoli. FY27 does not include any discretionary funding, and the reconciliation funding is for $1,806 thousand. (15) Integrated Logistics Support (ILS): Unique ALIS/ODIN Administrator Standup, Shared Maintenance Planning, Unique Site Activation Planning, Maintenance Planning, Pilot Flight Equipment (PFE) Chemical/ Biological Procurement, PFE ATN Ancillary Pool, and WIN7 migration (AV, TSS). Technical solutions to mitigate emerging fleet issues related to usage, design, and readiness shortfalls. FY27 does not include any discretionary funding, and the reconciliation funding is for $50,096 thousand. (16) Production Engineering Support: Cost-shared with F-35 partners to ensure proper cost-sharing contribution to the enterprise-wide requirement. Propulsion Administrative Labor, Sustainment Improvement Plan. Costs support various maintenance initiatives, including GSS reset (Mx initiatives), MxVS plan changes (LM), LM Aero Labs, Aircraft Battle Damage Repair (ABDR), E3 LM support, Structural Maintenance Database (SMDB), and PW manpower for P&M, CAM, program management, OBPHM, physical & IT security, contract & data management, EV & IMS support, depot MRL maturation, sustainment affordability, repair management, JTD sustainment, unit level SE/PHS&T, unit level repair development, site activation support, procurement support, NRS training requirement, activation support & other JTD, and depot activation. FY27 does not include any discretionary funding, and the reconciliation funding is for $26,353 thousand. (17) Fixed JPO Support: Starting in FY2022, Fixed JPO Support was broken out into a separate cost element from Production Engineering Support. Fixed JPO support costs are cost shared across the US and Partner participants and cost shares are balanced at the aggregate across all Services and appropriations. This cost element includes funds for the JPO program operations and administrative requirements at the enterprise level. Efforts in this cost element include working capital technical SME labor/civilian pay, program office Contractor Support Services, Arlington, VA and Dayton, OH program unique off-base lease costs, travel, supplies, program office IT and software/hardware applications, cybersecurity, studies (to include audit and affordability studies), and program office oversight of property management. These costs are not programmed, budgeted, or funded as part of base operating support and are not associated with Headquarters level support. The F-35 JPO continues to review program office civilian pay and contractor support. FY27 includes $62,363 thousand discretionary funding combined with the reconciliation funding for $32,754 thousand. (18) Organic Software Center (Depot) Standup: This initiative activates organic software centers at Hill AFB, Warner Robins AFB, NAWCWD China Lake, and NAWCWD Pt. Mugu to enable independent software development and integration across the F-35 fleet for core software and infrastructure domains. Funding supports a range of government and industry activities, including hardware procurement and sustainment, licensing, and OEM support and training. The core infrastructure domains are System Integration Lab (SIL) at Hill AFB and the Mission Systems Integration Lab (MSIL) at NAWCWD China Lake. Core software domains are distributed across all the sites: Hill AFB manages Pilot Software Systems, Core Processing Software, System Design, and Build & Release, and shares Prognostic and Health Management with NAWCWD China Lake. Warner Robins AFB oversees the APG-81 Radar, External Data Links (XCOM), Electro-Optical Training Systems, and the Distributed Aperture System. NAWCWD China Lake is responsible for Fire, Control & Stores, Communications, Navigations, and Identification, Ownship Sensor Software, and Mission Processing/Data Collection. Finally, NAWCWD Pt. Mugu handles the Electronic Warfare domain. FY27 does not include any discretionary funding, and the reconciliation funding is for $25,683 thousand. (19) Depot Standup Air Vehicle: Costs support shared planning and activation for component-level capability and airframe depots, including LRU/SRC/DMS/Block 4 EW activation phases 1-4; CONUS component depot capacity expansion; OEM STE for TR-3 PCD EU/TR-3 ICP/NGDAS; ATE tech refresh (tester buy) & TPS rehost (FOT) to Win 10; depot test equipment spares; COMFRC/AFMETCAL/CORONA activation support (labor/travel); dock expansion at Cherry Point & Ogden; and AV MROU activation - FRCSE (ALIS, facilities, & locally procured equipment, scuff & refresh). FY27 does not include any discretionary funding, and the reconciliation funding is for $122,891 thousand. (20) Depot Standup Propulsion: Depot Activation Non-Recurring - OKC, FRC E, FRC SE, CLS Sites, Shared/Common. FY27 does not include any discretionary funding, and the reconciliation funding is for $16,092 thousand. LI 0152 - JSF STOVL Navy UNCLASSIFIED Page 6 of 16 P-1 Line #4 Volume 1 - 52 === page 103 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy P-1 Line Item Number / Title: 0152 / JSF STOVL Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (†) O O C FY 2022 1.1.1) Airframe/CFE Contractor and Location Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Joint Strike Fighter - STOVL Location of PCO Award Date Date of First Delivery Dec 2022 Mar 2025 17 59,303.118 Y LOCKHEED MARTIN (21) / FT WORTH SS / FPIF NAVAIR Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date Jan 2020 (†) 2023 LOCKHEED MARTIN (21) / FT WORTH SS / FPIF NAVAIR Apr 2023 Jan 2026 15 64,488.333 Y Jan 2020 (†) 2024 LOCKHEED MARTIN (21) / FT WORTH SS / FPIF NAVAIR Dec 2024 Sep 2027 16 68,400.625 Y Mar 2023 (†) 2025 LOCKHEED MARTIN (21) / FT WORTH SS / FPIF NAVAIR Mar 2025 Nov 2027 13 67,559.231 Y Mar 2023 LOCKHEED MARTIN (21) / FT WORTH 1.1.1) Airframe/CFE 1.1.1) Airframe/CFE 1.1.1) Airframe/CFE (†) 2026 TBD NAVAIR Dec 2026 Aug 2029 11 73,642.364 Y Jan 2025 2022 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Jan 2023 Mar 2024 17 27,454.471 Y Mar 2020 2023 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Jun 2023 Nov 2024 15 29,250.000 Y Mar 2020 2024 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Jan 2024 Jun 2025 16 31,937.500 Y May 2023 2025 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Apr 2025 Jun 2026 13 35,567.692 Y May 2023 2026 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT TBD NAVAIR Apr 2027 Jun 2028 11 35,411.455 Y Jan 2026 CFE-Airframe Long Lead: TR3, Bulkhead 2022 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Mar 2022 Sep 2023 15 10,407.067 Y Jan 2020 CFE-Airframe Long Lead: TR3, Bulkhead 2023 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Dec 2022 Jun 2024 16 9,005.250 Y Jan 2020 CFE-Airframe Long Lead: TR3, Bulkhead 2024 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Dec 2023 Jun 2025 13 8,022.385 Y Mar 2023 CFE-Airframe Long Lead: TR3, Bulkhead 2025 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Dec 2024 Jun 2026 13 6,632.077 Y Mar 2023 CFE-Airframe Long Lead: TR3, Bulkhead 2026 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Dec 2025 Jun 2027 5 9,503.200 Y Jan 2025 CFE-Airframe Long Lead: TR3, Bulkhead 2027 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Dec 2026 Jun 2028 10 0.000 Y Jan 2026 CFE-Airframe Long Lead: TR3, Bulkhead 2028 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Dec 2027 Jun 2029 9 10,142.778 Y Jan 2027 CFE-Airframe Long Lead: TR3, Bulkhead 2029 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Dec 2028 Jun 2030 6 10,229.833 Y Jan 2028 CFE-Airframe Long Lead: TR3, Bulkhead 2030 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Dec 2029 Jun 2031 6 10,402.167 Y Jan 2029 CFE-Airframe Long Lead: TR3, Bulkhead 2031 LOCKHEED MARTIN / FT WORTH SS / FPIF NAVAIR Dec 2030 Jun 2032 9 11,688.333 Y Jan 2030 1.1.1) Airframe/CFE 1.1.5) Engines/Eng Acc (†) 1.1.5) Engines/Eng Acc (†) 1.1.5) Engines/Eng Acc (†) 1.1.5) Engines/Eng Acc (†) 1.1.5) Engines/Eng Acc (†) Advance Procurement LI 0152 - JSF STOVL Navy UNCLASSIFIED Page 7 of 16 P-1 Line #4 Volume 1 - 53 === page 104 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Item Number / Title [DODIC]: 1 / Joint Strike Fighter - STOVL FY Contractor and Location Method/Type or Funding Vehicle Other GFE - APG-85 Radar - Two Year Lead Time AP 2025 Northrop Grumman / Baltimore SS / FFP NAVAIR Sep 2025 Sep 2028 17 930.706 Y Sep 2025 Other GFE - APG-85 Radar - Two Year Lead Time AP 2026 Northrop Grumman / Baltimore SS / FFP NAVAIR Nov 2026 Oct 2028 6 1,846.833 Y Mar 2026 Other GFE - APG-85 Radar - Two Year Lead Time AP 2027 Northrop Grumman / Baltimore SS / FFP NAVAIR Feb 2027 Jan 2029 9 1,742.800 Y Jun 2026 Other GFE - APG-85 Radar - Two Year Lead Time AP 2028 Northrop Grumman / Baltimore SS / FFP NAVAIR Jan 2028 Dec 2029 6 1,750.333 Y Mar 2027 Other GFE - APG-85 Radar - Two Year Lead Time AP 2029 Northrop Grumman / Baltimore SS / FFP NAVAIR Jan 2029 Dec 2030 6 1,762.000 Y Mar 2028 Other GFE - APG-85 Radar - Two Year Lead Time AP 2030 Northrop Grumman / Baltimore SS / FFP NAVAIR Jan 2030 Dec 2031 9 1,970.889 Y Mar 2029 Other GFE - APG-85 Radar - One Year Lead Time AP 2026 Northrop Grumman / Baltimore SS / FFP NAVAIR Nov 2026 Oct 2028 5 5,935.600 Y Mar 2026 Other GFE - APG-85 Radar - One Year Lead Time AP 2027 Northrop Grumman / Baltimore SS / FFP NAVAIR Nov 2027 Oct 2029 10 6,227.800 Y Mar 2026 Other GFE - APG-85 Radar - One Year Lead Time AP 2028 Northrop Grumman / Baltimore SS / FFP NAVAIR Feb 2028 Jan 2030 9 6,971.222 Y Mar 2027 Other GFE - APG-85 Radar - One Year Lead Time AP 2029 Northrop Grumman / Baltimore SS / FFP NAVAIR Jan 2029 Dec 2030 6 7,001.500 Y Mar 2028 Other GFE - APG-85 Radar - One Year Lead Time AP 2030 Northrop Grumman / Baltimore SS / FFP NAVAIR Jan 2030 Dec 2031 6 7,047.667 Y Mar 2029 Other GFE - APG-85 Radar - One Year Lead Time AP 2031 Northrop Grumman / Baltimore SS / FFP NAVAIR Jan 2031 Dec 2032 9 7,883.778 Y Mar 2030 GFE-Engines Long Lead: Group 4 Rolls Royce 2022 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2022 Feb 2024 15 1,330.533 Y Mar 2020 GFE-Engines Long Lead: Group 4 Rolls Royce 2023 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2023 Feb 2025 16 1,185.750 Y Mar 2020 GFE-Engines Long Lead: Group 4 Rolls Royce 2024 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2024 Feb 2026 13 1,414.000 Y Jan 2023 GFE-Engines Long Lead: Group 4 Rolls Royce 2025 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2025 Feb 2027 13 1,166.077 Y Jan 2023 GFE-Engines Long Lead: Group 4 Rolls Royce 2026 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2026 Feb 2028 5 1,500.000 Y Jan 2023 GFE-Engines Long Lead: Group 4 Rolls Royce 2027 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2027 Feb 2029 10 0.000 Y Jan 2026 GFE-Engines Long Lead: Group 4 Rolls Royce 2028 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2028 Feb 2030 9 1,600.000 Y Jan 2027 GFE-Engines Long Lead: Group 4 Rolls Royce 2029 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2029 Feb 2031 6 1,650.000 Y Jan 2028 Cost Elements LI 0152 - JSF STOVL Navy O O C P-1 Line Item Number / Title: 0152 / JSF STOVL Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 8 of 16 P-1 Line #4 Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date Volume 1 - 54 === page 105 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements O O C P-1 Line Item Number / Title: 0152 / JSF STOVL Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Joint Strike Fighter - STOVL Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty RFP Issue Date FY Contractor and Location GFE-Engines Long Lead: Group 4 Rolls Royce 2030 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2030 Feb 2032 6 1,700.000 Y Jan 2029 GFE-Engines Long Lead: Group 4 Rolls Royce 2031 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2031 Feb 2033 9 1,944.444 Y Jan 2030 GFE-Engines Long Lead Group 10 Rolls Royce 2022 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2022 Aug 2023 15 203.533 Y Mar 2020 GFE-Engines Long Lead Group 10 Rolls Royce 2023 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2023 Aug 2024 16 181.438 Y Mar 2020 GFE-Engines Long Lead Group 10 Rolls Royce 2024 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2024 Aug 2025 13 216.308 Y Jan 2023 GFE-Engines Long Lead Group 10 Rolls Royce 2025 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2025 Aug 2026 13 178.385 Y Jan 2023 GFE-Engines Long Lead Group 10 Rolls Royce 2026 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2026 Aug 2027 5 205.000 Y Jan 2023 GFE-Engines Long Lead Group 10 Rolls Royce 2027 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2027 Aug 2028 10 0.000 Y Jan 2026 GFE-Engines Long Lead Group 10 Rolls Royce 2028 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2028 Aug 2029 9 215.000 Y Jan 2027 GFE-Engines Long Lead Group 10 Rolls Royce 2029 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2029 Aug 2030 6 220.000 Y Jan 2028 GFE-Engines Long Lead Group 10 Rolls Royce 2030 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2030 Aug 2031 6 225.000 Y Jan 2029 GFE-Engines Long Lead Group 10 Rolls Royce 2031 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2031 Aug 2032 9 255.556 Y Jan 2030 GFE-Engines Long Lead: Group 2 Mount-Signal & IDMS Rings 2022 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2022 Aug 2023 15 3.133 Y Mar 2020 GFE-Engines Long Lead: Group 2 Mount-Signal & IDMS Rings 2023 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2023 Aug 2024 16 5.375 Y Mar 2020 GFE-Engines Long Lead: Group 2 Mount-Signal & IDMS Rings 2024 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2024 Aug 2025 13 25.615 Y Jan 2023 GFE-Engines Long Lead: Group 2 Mount-Signal & IDMS Rings 2025 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2025 Aug 2026 13 21.231 Y Jan 2023 GFE-Engines Long Lead: Group 2 Mount-Signal & IDMS Rings 2026 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2026 Aug 2027 5 13.000 Y Jan 2023 GFE-Engines Long Lead: Group 2 Mount-Signal & IDMS Rings 2027 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2027 Aug 2028 10 0.000 Y Jan 2026 GFE-Engines Long Lead: Group 2 Mount-Signal & IDMS Rings 2028 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2028 Aug 2029 9 13.533 Y Jan 2027 GFE-Engines Long Lead: Group 2 Mount-Signal & IDMS Rings 2029 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2029 Aug 2030 6 13.750 Y Jan 2028 LI 0152 - JSF STOVL Navy UNCLASSIFIED Page 9 of 16 P-1 Line #4 (Each) Volume 1 - 55 === page 106 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements O O C P-1 Line Item Number / Title: 0152 / JSF STOVL Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Joint Strike Fighter - STOVL Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty RFP Issue Date FY Contractor and Location GFE-Engines Long Lead: Group 2 Mount-Signal & IDMS Rings 2030 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2030 Aug 2031 6 14.000 Y Jan 2029 GFE-Engines Long Lead: Group 2 Mount-Signal & IDMS Rings 2031 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2031 Aug 2032 9 15.778 Y Jan 2030 GFE-Engines Long Lead: Group 2 Sensor Ring Fwd 2022 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2022 Aug 2023 15 9.867 Y Mar 2020 GFE-Engines Long Lead: Group 2 Sensor Ring Fwd 2023 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2023 Aug 2024 16 8.063 Y Mar 2020 GFE-Engines Long Lead: Group 2 Sensor Ring Rear 2022 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2022 Aug 2023 15 4.200 Y Mar 2020 GFE-Engines Long Lead: Group 2 Sensor Ring Rear 2023 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2023 Aug 2024 16 8.063 Y Mar 2020 GFE-Engines Long Lead: Group 2 Support-Electronic Engine Control 2022 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2022 Aug 2023 30 3.333 Y Mar 2020 GFE-Engines Long Lead: RR PAL and EAP 2022 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2022 Aug 2023 15 226.000 Y Mar 2020 GFE-Engines Long Lead: RR PAL and EAP 2023 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2023 Aug 2024 16 201.438 Y Mar 2020 GFE-Engines Long Lead: RR PAL and EAP 2024 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2024 Aug 2025 13 240.231 Y Jan 2023 GFE-Engines Long Lead: RR PAL and EAP 2025 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2025 Aug 2026 13 198.077 Y Jan 2023 GFE-Engines Long Lead: RR PAL and EAP 2026 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2026 Aug 2027 5 225.000 Y Jan 2023 GFE-Engines Long Lead: RR PAL and EAP 2027 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2027 Aug 2028 10 0.000 Y Jan 2026 GFE-Engines Long Lead: RR PAL and EAP 2028 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2028 Aug 2029 9 235.000 Y Jan 2027 GFE-Engines Long Lead: RR PAL and EAP 2029 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2029 Aug 2030 6 240.000 Y Jan 2028 GFE-Engines Long Lead: RR PAL and EAP 2030 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Oct 2029 Apr 2031 6 245.000 Y Jan 2029 GFE-Engines Long Lead: RR PAL and EAP 2031 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Oct 2030 Apr 2032 9 277.778 Y Jan 2030 GFE-Engines Long Lead: Advanced Acquisition Contracts 2022 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Dec 2022 Dec 2024 15 2,263.267 Y Mar 2020 GFE-Engines Long Lead: Advanced Acquisition Contracts 2023 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Jun 2023 Jun 2025 16 1,912.000 Y Mar 2020 GFE-Engines Long Lead: Advanced Acquisition Contracts 2024 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2024 Feb 2026 13 2,263.231 Y Jan 2023 LI 0152 - JSF STOVL Navy UNCLASSIFIED Page 10 of 16 P-1 Line #4 (Each) Volume 1 - 56 === page 107 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (†) O O C P-1 Line Item Number / Title: 0152 / JSF STOVL Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Joint Strike Fighter - STOVL Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty RFP Issue Date FY Contractor and Location GFE-Engines Long Lead: Advanced Acquisition Contracts 2025 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2025 Feb 2027 13 1,799.692 Y Jan 2023 GFE-Engines Long Lead: Advanced Acquisition Contracts 2026 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2026 Feb 2028 5 3,150.800 Y Jan 2023 GFE-Engines Long Lead: Advanced Acquisition Contracts 2027 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2027 Feb 2029 10 0.000 Y Jan 2026 GFE-Engines Long Lead: Advanced Acquisition Contracts 2028 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2028 Feb 2030 9 1,687.889 Y Jan 2027 GFE-Engines Long Lead: Advanced Acquisition Contracts 2029 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2029 Feb 2031 6 1,659.833 Y Jan 2028 GFE-Engines Long Lead: Advanced Acquisition Contracts 2030 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2030 Feb 2032 6 1,663.333 Y Jan 2029 GFE-Engines Long Lead: Advanced Acquisition Contracts 2031 UNITED TECH, PRATT & WHITNEY / EAST HARTFORD, CT SS / FPIF NAVAIR Feb 2031 Feb 2033 9 1,829.222 Y Jan 2030 (Each) indicates the presence of a P-21 Footnotes: (21) F-35B production capacity is influenced by F-35C quantities. Maximum combined production including partners for F-35B and F-35C is 60 per year. LI 0152 - JSF STOVL Navy UNCLASSIFIED Page 11 of 16 P-1 Line #4 Volume 1 - 57 === page 108 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0152 / JSF STOVL Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / Joint Strike Fighter - STOVL Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 129 1 2022 NAVY 17 0 17 1 2023 NAVY 15 0 15 1 2024 NAVY 16 0 16 16 1 2025 NAVY 13 0 13 13 1 2026 NAVY 11 0 11 11 1.1.5) Engines/Eng Acc A - - - - - - - - - - - - - - - - - - - - - - 17 A - - - - - - - - - - - - - - - - - - 15 (5) Prior Years Deliveries: 129 2 2022 NAVY 17 0 17 2 2023 NAVY 15 0 15 2 2024 NAVY 16 0 16 2 2025 NAVY 13 0 13 2 2026 NAVY 11 0 11 A - - - - - - - - - - - - - A - - - - - - - - - - 1 - 2 - 2 - 2 - 2 - 2 - 2 15 4 A - - - - - - - - - 16 13 11 O C T LI 0152 - JSF STOVL Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #4 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 58 === page 109 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0152 / JSF STOVL Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / Joint Strike Fighter - STOVL Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 129 1 2022 NAVY 17 0 17 - - - - - - 3 1 1 1 2023 NAVY 15 0 15 - - - - - - - - - - - - - - - 3 3 1 1 2024 NAVY 16 0 16 A - - - - - - - - - - - - - - - - - - - - - - 16 1 2025 NAVY 13 0 13 A - - - - - - - - - - - - - - - - - - - 13 1 2026 NAVY 11 0 11 1.1.5) Engines/Eng Acc 1 1 2 3 1 1 2 - 1 0 1 3 2 1 1 0 11 (5) Prior Years Deliveries: 129 2 2022 NAVY 17 13 4 2 2023 NAVY 15 0 15 - 2 2 2024 NAVY 16 0 16 - 2 2025 NAVY 13 0 13 2 2026 NAVY 11 0 11 1 1 2 - 0 1 - 1 - 1 - 1 - 2 - - A - - 2 2 2 1 2 1 - - 0 1 - 2 - 2 - 2 - 2 - 1 - 2 - 0 - - - 2 1 2 2 6 11 O C T LI 0152 - JSF STOVL Navy 1 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #4 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 59 === page 110 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0152 / JSF STOVL Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / Joint Strike Fighter - STOVL Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 129 1 2022 NAVY 17 17 0 1 2023 NAVY 15 15 0 1 2024 NAVY 16 0 16 - - - - - - - - - - - 1 2025 NAVY 13 0 13 - - - - - - - - - - - 1 2026 NAVY 11 0 11 A - - - - - - - - - 1.1.5) Engines/Eng Acc 0 0 3 - 3 - - 3 - - 1 - 3 - - - - - 3 2 - - - 3 2 - 0 - - 2 - 1 - 3 - 0 - - 11 (5) Prior Years Deliveries: 129 2 2022 NAVY 17 17 0 0 2 2023 NAVY 15 15 0 0 2 2024 NAVY 16 16 0 2 2025 NAVY 13 7 6 2 2026 NAVY 11 0 11 0 1 1 1 1 1 0 A - O C T LI 0152 - JSF STOVL Navy 1 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #4 M A R A P R M A Y 2 J U N 2 J U L A U G 2 S E P Volume 1 - 60 5 === page 111 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0152 / JSF STOVL Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / Joint Strike Fighter - STOVL Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 129 1 2022 NAVY 17 17 0 0 1 2023 NAVY 15 15 0 0 1 2024 NAVY 16 16 0 0 1 2025 NAVY 13 13 0 1 2026 NAVY 11 0 11 1.1.5) Engines/Eng Acc 0 - - - - - - - - - - 2 2 1 2 2 2 0 (5) Prior Years Deliveries: 129 2 2022 NAVY 17 17 0 0 2 2023 NAVY 15 15 0 0 2 2024 NAVY 16 16 0 0 2 2025 NAVY 13 13 0 2 2026 NAVY 11 6 5 0 2 O C T LI 0152 - JSF STOVL Navy 2 N O V 1 D E C 0 J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #4 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 61 === page 112 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0152 / JSF STOVL Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Item Number / Title [DODIC]: 1 / Joint Strike Fighter - STOVL Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 LOCKHEED MARTIN (21) FT WORTH 2 UNITED TECH, PRATT & WHITNEY - EAST HARTFORD, CT ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 12 12 24 0 6 24 30 24 3 27 30 12 12 24 0 4 17 21 0 4 14 18 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (21) F-35B production capacity is influenced by F-35C quantities. Maximum combined production including partners for F-35B and F-35C is 60 per year. LI 0152 - JSF STOVL Navy UNCLASSIFIED Page 16 of 16 P-1 Line #4 Volume 1 - 62 === page 113 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat Aircraft P-1 Line Item Number / Title: 0152 / JSF STOVL Program Elements for Code B Items: 0204146M Other Related Program Elements: 0204146N Line Item MDAP/MAIS Code: 198 Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Gross/Weapon System Cost ($ in Millions) 3,231.054 169.389 113.744 77.963 - 77.963 198.291 136.662 145.521 215.054 - 4,287.678 Net Procurement (P-1) ($ in Millions) 3,231.054 169.389 113.744 77.963 - 77.963 198.291 136.662 145.521 215.054 - 4,287.678 Total Obligation Authority ($ in Millions) 3,231.054 169.389 113.744 77.963 - 77.963 198.291 136.662 145.521 215.054 - 4,287.678 Description: Joint Strike Fighter (JSF) program is developing and fielding a family of aircraft that meets the needs of DoW and allies, with the F-35A Conventional Take Off and Landing (CTOL) variant, F-35B Short TakeOff and Vertical Landing (STOVL) variant and F-35C Carrier Variant (CV). The aircraft will have commonality among the three variants to minimize life cycle costs. This is a joint program with no executive service. Service Acquisition Executive (SAE) authority alternates between Department of Navy (DON) and Department of Air Force (DAF) and currently resides with the Department of the Air Force. The F-35 is next generation of strike fighters to command and maintain global air superiority. FY2027 Advance procurement funding will support Aircraft and Engine Termination Liability and long-lead parts and materials necessary to protect delivery schedule. FY 2027 AP procures Other GFE APG-85 Radar for U.S. Aircraft. Note: (1) F-35B USMC variant Budget Line Item 0152 was created in FY11, prior years budgets were reported under Budget Line Item 0147. The F-35C continues to report under Budget Line Item 0147. CY Advance Procurement for FY2010 F-35B aircraft was included in the FY2010 F-35C budget. The Advance Procurement Credit for FY2010 F-35B aircraft was included in the FY2011 F-35B budget. The balance of the funds for end items is included in the budget submission. LI 0152 - JSF STOVL Navy UNCLASSIFIED Page 1 of 6 P-1 Line #5 Volume 1 - 63 === page 114 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat Aircraft P-1 Line Item Number / Title: 0152 / JSF STOVL Program Elements for Code B Items: 0204146M Other Related Program Elements: 0204146N Line Item MDAP/MAIS Code: 198 Exhibits Schedule Exhibit Type Title* ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-10 1 / Joint Strike Fighter - STOVL 177 / 3,231.054 13 / 169.389 11 / 113.744 - / 77.963 - / - - / 77.963 P-40 Total Gross/Weapon System Cost 177 / 3,231.054 13 / 169.389 11 / 113.744 - / 77.963 - / - - / 77.963 *Title represents the P-10 Title for Advance Procurement. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY2027 budget requests Advance Procurement for long lead materials to support Airframe and Engine long-lead parts necessary to protect delivery schedules. Full funding for long lead end items requesting advance procurement is included in the budget submission. FY2027 budget exhibits include funding to support the procurement of Other GFE - APG-85 radar to replace the APG-81 radar in United States versions of F-35 aircraft. Due to extra-long lead times, the APG-85 requires advance procurement for long-lead materials and radar completion for on-time install into the completed aircraft. The first year of APG-85 adv procurement procures radar long-lead materials and the second year of AP continues material buys, to manufacture and deliver the APG-85 for integration onto US-only aircraft. LI 0152 - JSF STOVL Navy UNCLASSIFIED Page 2 of 6 P-1 Line #5 Volume 1 - 64 === page 115 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 0152 / JSF STOVL Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 First System (2027) Award Date: December 2026 First System (2027) Completion Date: June 2028 Production Leadtime Joint Strike Fighter - STOVL P-5 Number / Title: 1 / Joint Strike Fighter - STOVL Interval Between Systems: 1 Months Prior Years (Months) FY 2025 (Each) 177 When Required Prior Years (Months) FY 2026 (Each) Quantity Cost Elements Date: April 2026 13 FY 2025 ($ M) FY 2027 (Each) (Each) 11 FY 2026 ($ M) FY 2027 ($ M) ($ M) CFE CFE-Airframe Long Lead (11) (†) 0 1,691.064 - - - 18 404.481 86.217 47.516 0.000 For FY19 Economic Order Quantity (Lot 13) 0 91.489 - - - For FY20 Economic Order Quantity (Lot 14) 0 91.489 - - - For FY21 Economic Order Quantity (Lot 15) 0 84.500 - - - For FY22 Economic Order Quantity (Lot 16) 0 56.333 - - - For FY23 Economic Order Quantity (Lot 17) 0 84.500 - - - 2,503.856 86.217 47.516 0.000 - 15.822 11.081 15.685 - - 29.678 62.278 CFE-Airframe Long Lead: TR3, Bulkhead Total: CFE GFE Other GFE - APG-85 Radar - Two Year Lead Time AP (12) (†) 36 Other GFE - APG-85 Radar - One Year Lead Time AP (13) (†) 18 GFE- Engines Long Lead (14) GFE-Engines Long Lead: Group 4 Rolls Royce 0 556.384 - - - (†) 23 57.312 15.159 7.500 0.000 (†) 23 8.768 2.319 1.025 0.000 0.466 0.276 0.065 0.000 GFE-Engines Long Lead Group 10 Rolls Royce GFE-Engines Long Lead: Group 2 Mount-Signal & IDMS Rings (†) 23 GFE-Engines Long Lead: Group 2 Sensor Ring Fwd (†) 23 0.277 - - - (†) 23 0.192 - - - 0.100 - - - 9.736 2.575 1.125 0.000 GFE-Engines Long Lead: Group 2 Sensor Ring Rear GFE-Engines Long Lead: Group 2 Support-Electronic Engine Control (†) GFE-Engines Long Lead: RR PAL and EAP LI 0152 - JSF STOVL Navy 23 (†) 23 UNCLASSIFIED Page 3 of 6 P-1 Line #5 Volume 1 - 65 === page 116 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 0152 / JSF STOVL Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 First System (2027) Award Date: December 2026 First System (2027) Completion Date: June 2028 Cost Elements When Required FY 2025 ($ M) Congressional Rescission Enacted 23 (16) Total: GFE Total Advance Procurement/Obligation Authority LI 0152 - JSF STOVL Navy FY 2026 ($ M) GFE-Engines Long Lead: Advanced Acquisition Contracts (15) (†) P-5 Number / Title: 1 / Joint Strike Fighter - STOVL Interval Between Systems: 1 Months Prior Years (Months) Date: April 2026 FY 2027 ($ M) 93.963 23.396 - ($ M) 15.754 0.000 23.625 - - 727.198 83.172 66.228 77.963 3,231.054 169.389 113.744 77.963 0 UNCLASSIFIED Page 4 of 6 P-1 Line #5 Volume 1 - 66 === page 117 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 P-1 Line Item Number / Title: 0152 / JSF STOVL Date: April 2026 P-5 Number / Title: 1 / Joint Strike Fighter - STOVL FY 2027 Production Leadtime QPA Cost Elements Unit Cost (Months) (Each) ($ K) Contract Forecast Date 2027 Qty For FY (Each) Total Cost Request ($ M) CFE CFE-Airframe Long Lead 0 CFE-Airframe Long Lead: TR3, Bulkhead (11) (†) 1 18 0.000 Dec 2026 10 0.000 For FY19 Economic Order Quantity (Lot 13) 0 - For FY20 Economic Order Quantity (Lot 14) 0 - For FY21 Economic Order Quantity (Lot 15) 0 - For FY22 Economic Order Quantity (Lot 16) 0 - For FY23 Economic Order Quantity (Lot 17) 0 - Total: CFE 0.000 GFE Other GFE - APG-85 Radar - Two Year Lead Time AP (12) (†) 1 36 1,742.800 Feb 2027 9 15.685 Other GFE - APG-85 Radar - One Year Lead Time AP (13) (†) 1 24 6,227.800 Nov 2027 10 62.278 GFE- Engines Long Lead (14) 0 GFE-Engines Long Lead: Group 4 Rolls Royce (†) 1 24 0.000 Feb 2027 10 0.000 (†) 1 18 0.000 Feb 2027 10 0.000 2 18 0.000 Feb 2027 10 0.000 GFE-Engines Long Lead Group 10 Rolls Royce GFE-Engines Long Lead: Group 2 Mount-Signal & IDMS Rings GFE-Engines Long Lead: Group 2 Sensor Ring Fwd (†) (†) GFE-Engines Long Lead: Group 2 Sensor Ring Rear (†) GFE-Engines Long Lead: Group 2 Support-Electronic Engine Control GFE-Engines Long Lead: RR PAL and EAP (†) GFE-Engines Long Lead: Advanced Acquisition Contracts Congressional Rescission Enacted - (16) (15) (†) (†) 0 - 0 - 0 - 0 18 0.000 Feb 2027 10 0.000 0 24 0.000 Feb 2027 10 0.000 0 - Total: GFE 77.963 Total Advance Procurement/Obligation Authority 77.963 Description: Advance procurement funding will support Airframe and Engine Termination Liability, and long-lead parts and materials necessary to protect delivery schedule of JSF aircraft procurements. LI 0152 - JSF STOVL Navy UNCLASSIFIED Page 5 of 6 P-1 Line #5 Volume 1 - 67 === page 118 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 P-1 Line Item Number / Title: 0152 / JSF STOVL Aircraft procured with AP/long lead deliver one year earlier than aircraft procured without AP, providing critical 12 month time savings for delivery of aircraft. (†) Date: April 2026 P-5 Number / Title: 1 / Joint Strike Fighter - STOVL indicates the presence of Contract Data presented in the associated P-5 Item's P-5a exhibit. Footnotes: (11) CFE-Airframe Long Lead: AP funding will be used towards the following Air Vehicle suppliers/systems based on the lead time associated with the material(s): TR3 Components (Integrated Core Processor, Aircraft Memory System, Panoramic Cockpit Display); Bulkhead forgings; Collins Landing Gear; BAE Electronic Warfare components; IAI Outer Wing Box; BAE Aft Fuselage components; Northrop Grumman Center Fuselage, Communication, Navigation & Identification (CNI), Block 4, EW Drop 13, and Radar components; ATK Wing Skins; Curtiss-Wright Controls LEFDS; Ball Aerospace CNI Integrated Body Apertures; Heroux-Devtek FODUS; Fokker Flaperons; Arkwin Industries Actuators; and Leonardo Wing. (12) GFE-APG85 Radar Two Year Lead Time: AP is required to support APG-85 Radar long-lead end item and electronic warfare integration. This two-year AP supports suppliers/systems based on lead time associated with the materials: microcircuits, connectors, magnet assembly, transceiver kits, inductor chips, forward housing assembly, signal processors, radiator structures, amplifiers, and chassis assembly. (13) GFE-APG85 Radar One Year Lead Time: The budget request includes two years/two phases of advance procurement to procure the APG-85 radar which replaces the existing APG-81 radar in United States versions of F-35 aircraft. The FY27 one year lead time AP cost has been adjusted based on the prior two year lead time AP cost to capture the total APG-85 AP requirement. (14) (15) GFE-Engines Long Lead: Starting in FY22, this is broken down into more details. GFE-Engines Long Lead: Advance Acquisition Contracts (AAC) will be awarded for long-lead items on a termination liability basis to protect delivery schedule. AP funding will be used towards the following Propulsion suppliers/systems based on lead time associated with material(s): Engine Hardware (High Pressure Turbine (HPT), Low Pressure Turbine (LPT), Turbine Exhaust, Compressor Rotors and Stators, Nozzle, Liners and Seals) and Collins Inlet Debris Monitor Signal Conditioning Units (IDMS SCUs), Rolls Royce Hardware (LiftFan hardware, Clutch Assy, 3 Bearing Swift Mount (3BSM), and Drive Shaft Assy). (16) Cost Element: Congressional Rescission Enacted captures rescission to FY2025 ($23.625M) F-35B Advanced Procurement due to quantity reduction in FY2026. LI 0152 - JSF STOVL Navy UNCLASSIFIED Page 6 of 6 P-1 Line #5 Volume 1 - 68 === page 119 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat Aircraft ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0605212M Line Item MDAP/MAIS Code: 390 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 67 18 14 22 - 22 23 20 16 15 1 196 Gross/Weapon System Cost ($ in Millions) 10,358.195 2,611.848 2,268.610 3,398.601 3,398.601 3,717.564 3,355.934 2,891.466 2,681.085 620.724 31,904.027 Less PY Advance Procurement ($ in Millions) 1,251.760 418.191 347.822 354.151 - 354.151 456.360 545.021 381.595 339.428 353.380 4,447.708 Net Procurement (P-1) ($ in Millions) 9,106.435 2,193.657 1,920.788 3,044.450 0.000 3,044.450 3,261.204 2,810.913 2,509.871 2,341.657 267.344 27,456.319 Resource Summary Procurement Quantity (Units in Each) Prior Years 0.000 To FY 2031 Complete Plus CY Advance Procurement ($ in Millions) 1,669.951 422.971 335.352 429.295 - 429.295 515.736 381.595 339.428 353.380 Total Obligation Authority ($ in Millions) 10,776.386 2,616.628 2,256.140 3,473.745 0.000 3,473.745 3,776.940 3,192.508 2,849.299 2,695.037 267.344 Total 4,447.708 31,904.027 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 54.675 79.354 41.284 - 41.284 41.375 38.517 26.806 Flyaway Unit Cost ($ in Thousands) 133,069.746 - 139,144.667 148,823.714 146,259.500 - 146,259.500 150,516.174 155,188.900 166,334.125 167,110.400 - 321,595.000 - 146,820.230 282.011 Gross/Weapon System Unit Cost ($ in Thousands) 154,599.925 145,102.667 162,043.571 154,481.864 - 154,481.864 161,633.217 167,796.700 180,716.625 178,739.000 620,724.000 162,775.648 Description: The CH-53K is a next generation fly by wire heavy-lift helicopter that provides significant improvements in range, payload, performance, cargo handling, turn-around times, reliability, maintainability, interoperability and survivability. It is the only marinized heavy-lift helicopter in the world and the Department of War's only heavy-lift helicopter. The CH-53K mission is to support the Marine Air-Ground Task Force (MAGTF) Commander by providing assault support transport of heavy equipment, combat troops, and supplies, day or night under all weather conditions during expeditionary, joint, or combined operations. The CH-53K provides a greater payload at greater ranges than any current or emerging rotorcraft to support the rapid transition of Joint and Coalition forces from contact to blunt layer activities in a contested environment. The system addresses current connector shortfalls making it a critical enabler in the execution of distributed operations; a key component of the Marine Corps' Expeditionary Advanced Base Operations concept which supports the President's National Security Strategy, the Tri-Service Maritime Strategy and the Navy's Distributed Maritime Operational concept. The CH-53K is capable of integrating into the current battlefield and taking advantage of future technologies, such as manned/unmanned teaming and MAGTF digital interoperability. The modern fly by wire system provides greater safety, survivability, and reliability compared to other joint rotorcraft. When compared to the legacy aircraft, the CH-53K improves reliability and decreases operations and support costs by reducing maintenance man hours per flight hour while maximizing work effectiveness and efficiency. Total aircraft quantities for the CH-53K program are 200 helicopters. Of the 200 aircraft, four are System Demonstration Test Articles (SDTAs) and were incrementally funded using RDT&E funds and 196 aircraft are funded with Aircraft Procurement, Navy (APN). The CH-53K System Development and Demonstration program received a successful Milestone C decision on 4 April 2017. The CH-53K Production program received approval on 22 December 2022 to proceed to Full Rate Production. LI 0158 - CH-53K (Heavy Lift) Navy UNCLASSIFIED Page 1 of 16 P-1 Line #6 Volume 1 - 69 === page 120 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat Aircraft ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0605212M Line Item MDAP/MAIS Code: 390 Exhibits Schedule Exhibit Type Title* P-5 1 / CH-53K (Heavy Lift) P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 67 / 10,358.195 18 / 2,611.848 14 / 2,268.610 22 / 3,398.601 - / 0.000 22 / 3,398.601 67 / 10,358.195 18 / 2,611.848 14 / 2,268.610 22 / 3,398.601 - / 0.000 22 / 3,398.601 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 APN request funds the procurement of Full Rate Production (FRP) Lot 11 (twenty-two aircraft) and advance procurement in support of Lot 12 long-lead materials. The Lots 9-13 (FY 2025-2029) Airframe and Engines cost elements are budgeted as Multi-Year Procurement (MYP) contracts and MYP contract pricing is based on budgeted quantities. The current procurement profile continues to support the Headquarters Marine Corps (HQMC) CH-53E to CH-53K transition plan. Cost reduction opportunities will continue to be explored as the program progresses through Full Rate Production. NRE requirements address critical obsolescence issues, avionics software update and integration activities, and supplier production rate tooling required to support the HQMC transition plan. Airframe, Engine, and Avionics Peculiar Ground Support Equipment (PGSE) requirements are derived by three factors: scheduled stand-up of CONUS Main Operating Base; Initial Operating Capability (IOC) of sea-based deployment of four plane detachment; and establishment of Depot repair capability for the entire weapons system. A phased approach is being utilized to procure the required PGSE to support IOC plus four years as required by 10 US Code 2464/Navy Support Date (NSD). The cost in each year is based on the specific equipment being purchased for that year's capability establishment, such as main rotor head assembly, main gearbox assembly, tail gearbox assembly, intermediate gearbox, nose gearbox assembly, tail bumper retract actuator, DIRCM cooling fan assembly, engine exhaust assembly, and engine duct assembly, not cost growth. Peculiar Training Equipment procurements are necessary to equip the Fleet Replacement Squadron (FRS) and continue the establishment of training capacity for the CH-53E to CH-53K transition. Publications / Tech Data requirements are aligned with the procurement of Product Support Packages, including drawings, procedures, and technical manuals, capturing production aircraft configuration to support Intermediate (I) and Depot (D) level repair capabilities to meet IOC and 10 US Code 2464/NSD requirements. Other ILS requirements support the program transition plan from interim to organic support and Depot Capability establishment, which includes Component Pilot Repair events at Depot and I-Level facilities, validation and verification of procedures, and publishing of final products up to declaration of capability being established for a particular component within the scope of the contract being funded. Production Engineering Support requirements are for Government and Contractor Support Services (CSS) annualized support of the production program. Initial Spares continue to build range and depth of T408 Engine spares and spare parts commensurate with the growing CH-53K inventory and required sparing level to support increased production as the program executes Full Rate Production. FY 2027 spares procurements will enable the program to remain on track to fully support deployed flight operations in the Fleet. LI 0158 - CH-53K (Heavy Lift) Navy UNCLASSIFIED Page 2 of 16 P-1 Line #6 Volume 1 - 70 === page 121 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / CH-53K (Heavy Lift) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total 67 18 14 22 - Gross/Weapon System Cost ($ in Millions) 10,358.195 2,611.848 2,268.610 3,398.601 22 Less PY Advance Procurement ($ in Millions) 1,251.760 418.191 347.822 354.151 - 354.151 Net Procurement (P-1) ($ in Millions) 9,106.435 2,193.657 1,920.788 3,044.450 0.000 3,044.450 0.000 3,398.601 Plus CY Advance Procurement ($ in Millions) 1,669.951 422.971 335.352 429.295 - 429.295 Total Obligation Authority ($ in Millions) 10,776.386 2,616.628 2,256.140 3,473.745 0.000 3,473.745 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) 154,599.925 54.675 79.354 41.284 - 41.284 145,102.667 162,043.571 154,481.864 - 154,481.864 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost (†) 1.1.1) Airframe/CFE 98,113.642 67 4,282.364 198 847.908 - - 4.879 - - (3) - - 435.153 - - 1.1.6) Other GFE - - 20.684 - - - 159.234 - - - (1) 1.1.2) Engines (†) (2) 1.1.3) CFE Mission Electronics 1.1.4) GFE Electronics 1.1.7) Rec Flyaway ECO (4) Subtotal: Recurring Cost 6,573.614 111,946.389 5,020.852 18 54 2,015.035 117,316.571 271.126 - 5,170.262 14 42 1,642.432 118,478.364 217.151 5,324.121 22 2,606.524 - - - 118,478.364 22 2,606.524 66 351.392 - - - 5,324.121 66 351.392 - - - - - - - - - - - - 138.243 - - 85.268 - - 137.758 - - - - - 137.758 - 1.957 - - 0.625 - - 0.934 - - - - - 0.934 - - 50.127 - - 53.331 - - 66.126 - - - - - 66.126 8,041.472 - - 2,476.488 - - 1,998.807 - - 3,162.734 - - - - - 3,162.734 - 831.409 - - 26.956 - - 55.288 - - 46.445 - - - - - 46.445 - - 42.792 - - 1.160 - - 29.437 - - 8.530 - - - - - 8.530 - - 874.201 - - 28.116 - - 84.725 - - 54.975 - - - - - 54.975 - - 8,915.673 - - 2,504.604 - - 2,083.532 - - 3,217.709 - - - - - 3,217.709 - - 229.063 - - 1.752 - - 31.713 - - 27.541 - - - - - 27.541 Non Recurring Cost 1.2.1) Non-Recurring Cost (5) 1.2.2) Ancillary Equip (6) Subtotal: Non Recurring Cost Subtotal: Flyaway Cost Support Cost 2.1) Airframe PGSE LI 0158 - CH-53K (Heavy Lift) Navy UNCLASSIFIED Page 3 of 16 P-1 Line #6 Volume 1 - 71 === page 122 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / CH-53K (Heavy Lift) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) 2.2) Engine PGSE - - 25.476 - - - - - 4.721 - - 2.168 - - - - - 2.168 2.3) Avionics PGSE - - 73.497 - - - - - 9.785 - - 7.923 - - - - - 7.923 30.004 2.4) Peculiar Training - - 251.765 - - 4.622 - - 26.085 - - 30.004 - - - - - 2.5) Pubs / Tech Data - - 166.382 - - 1.944 - - 6.244 - - 4.753 - - - - - 4.753 2.7) Other ILS - - 275.481 - - 35.404 - - 41.980 - - 42.675 - - - - - 42.675 2.8) Production Engineering Support - - 420.858 - - 63.522 - - 64.550 - - 65.828 - - - - - 65.828 Subtotal: Support Cost - - 1,442.522 - - 107.244 - - 185.078 - - 180.892 - - - - - 180.892 67 10,358.195 145,102.667 22 3,398.601 - - 22 3,398.601 Equip (7) Gross/Weapon System Cost (†) 154,599.925 18 2,611.848 162,043.571 14 2,268.610 154,481.864 0.000 154,481.864 indicates the presence of a P-5a Footnotes: (1) (2) Cost Element 1.1.1: FY 2025-2029 airframe unit costs reflect final MYP contract pricing for Lots 9-13 based on budgeted quantities. Cost Element 1.1.2: FY 2025-2029 engine unit costs reflect final MYP contract pricing for Lots 9-13. Cost estimates based on budgeted quantities. PY engine quantity accounts for transfer of three (3) SDTA assets to production for use in Lot 5 aircraft. (3) (4) Cost Element 1.1.4: The GFE Electronics requirement increases to support the ramping production rate FY 2026 to FY 2027. Cost Element 1.1.7: Engineering Change Orders (ECO) provides for unknown, but anticipated, future engineering changes commensurate with the level of risk in the program in a given FY. This includes CFE/ GFE correction of deficiencies found during flight test and incorporation of required changes into production aircraft, such as adjustments to airframe, avionics, and drive train components. This ensures that a single fleet configuration is maintained in order to reduce future sustainment costs. (5) Cost Element 1.2.1: FY 2027 NRE requirements support the ICS (Intercommunication System) obsolescence redesign-$34.040M, OBIGGS (On-board Inert Gas Generating System) obsolescence redesign phase 2-$10.504M, and AMS (Avionics Management System) software integration lab hardware obsolescence phase 3-$1.901M. (6) Cost Element 1.2.2: Ancillary Equipment procures aircraft mission kit hardware identified in the CH-53K Weapon System Planning Document (WSPD), such as cabin armor, tactical bulk fuel delivery system (TBFDS), GAU-21 gun mounts, and pallet winches. (7) Cost Element 2.4: FY 2027 Peculiar Training Equipment requirement procures Containerized Flight Training Device-5 (CFTD-5) for MCAS Miramar-$26.606M, and CFTD production concurrency software updates-$3.398M. LI 0158 - CH-53K (Heavy Lift) Navy UNCLASSIFIED Page 4 of 16 P-1 Line #6 Volume 1 - 72 === page 123 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Item Number / Title [DODIC]: 1 / CH-53K (Heavy Lift) FY Contractor and Location Method/Type or Funding Vehicle (†) 2021 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR (†) 2022 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Feb 2022 Mar 2027 11 93,965.182 Y Nov 2019 (†) 2023 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Aug 2023 Oct 2027 12 95,220.667 Y Jun 2021 (†) 2024 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR May 2024 Jun 2028 15 92,409.733 Y Jun 2021 (†) 2025 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Sep 2025 Apr 2029 18 111,946.389 Y Jul 2024 (†) 2026 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Dec 2025 Apr 2030 14 117,316.571 Y Jul 2024 (†) Cost Elements O O C P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) 1.1.1) Airframe/CFE 1.1.1) Airframe/CFE 1.1.1) Airframe/CFE 1.1.1) Airframe/CFE 1.1.1) Airframe/CFE 1.1.1) Airframe/CFE Location of PCO Award Date Date of First Delivery Jun 2021 Jun 2026 Specs Date Unit Cost Avail Revision Now? Available ($ K) RFP Issue Date 9 97,622.333 Y Nov 2019 Qty (Each) 2027 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Dec 2026 Apr 2031 22 118,478.364 Y Jul 2024 1.1.2) Engines (†) 2022 General Electric Company / Lynn, MA SS / FFP NAVAIR Apr 2023 Jul 2026 33 3,915.424 Y Apr 2021 1.1.2) Engines (†) 2023 General Electric Company / Lynn, MA SS / FFP NAVAIR Apr 2023 Feb 2027 36 3,614.083 Y Apr 2021 1.1.2) Engines (†) 2024 General Electric Company / Lynn, MA SS / FFP NAVAIR Feb 2024 Oct 2027 45 3,507.889 Y Apr 2021 1.1.2) Engines (†) 2025 General Electric Company / Lynn, MA SS / FFP NAVAIR Jan 2026 Aug 2028 54 5,020.852 Y Oct 2022 1.1.2) Engines (†) 2026 General Electric Company / Lynn, MA SS / FFP NAVAIR Jan 2026 Aug 2029 42 5,170.262 Y Oct 2022 1.1.2) Engines (†) 2027 General Electric Company / Lynn, MA SS / FFP NAVAIR Oct 2026 Aug 2030 66 5,324.121 Y Oct 2022 FY23 Long Lead - FWD Fuselage Structural Assembly 2022 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2022 Aug 2024 9 9,298.889 Y May 2021 FY23 Long Lead - Transition Structural Assembly 2022 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2022 Jun 2024 9 2,825.000 Y May 2021 FY23 Long Lead - Tail Pylon Assembly 2022 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2022 Oct 2024 10 1,498.900 Y May 2021 FY24 Long Lead - FWD Fuselage Structural Assembly 2023 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2023 Aug 2025 10 9,663.300 Y May 2021 FY24 Long Lead - Transition Structural Assembly 2023 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2023 Jun 2025 10 2,935.700 Y May 2022 FY24 Long Lead - Tail Pylon Assembly 2023 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2023 Oct 2025 10 1,557.600 Y May 2021 FY24 Long Lead - Collective/Cyclic Inceptors 2023 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2023 Feb 2025 10 1,034.000 Y May 2021 FY24 Long Lead - Landing Gear Assembly (Nose & Mains) 2023 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2023 May 2025 10 958.000 Y May 2021 FY24 Long Lead - Rotary Wing Head Damper/Hub Assembly 2023 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2023 Feb 2025 10 874.700 Y May 2021 FY24 Long Lead - Main Rotor Servo 2023 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2023 Nov 2024 10 771.100 Y May 2021 1.1.1) Airframe/CFE Advance Procurement LI 0158 - CH-53K (Heavy Lift) Navy UNCLASSIFIED Page 5 of 16 P-1 Line #6 Volume 1 - 73 === page 124 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Item Number / Title [DODIC]: 1 / CH-53K (Heavy Lift) FY Contractor and Location Method/Type or Funding Vehicle FY24 Long Lead - APU Engine Assembly 2023 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2023 Oct 2024 6 896.000 Y May 2021 FY24 Long Lead - Hub Subassembly Forgings 2023 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2023 May 2025 10 446.300 Y May 2021 FY25 Long Lead - FWD Fuselage Structural Assembly 2024 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Dec 2023 Jul 2026 15 6,986.467 Y May 2022 FY25 Long Lead - Transition Structural Assembly 2024 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Dec 2023 May 2026 15 2,122.533 Y May 2022 FY25 Long Lead - Tail Pylon Assembly 2024 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Dec 2023 Sep 2026 15 1,126.133 Y May 2022 FY25 Long Lead - Collective/Cyclic Inceptors 2024 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Dec 2023 Jan 2026 15 747.600 Y May 2022 FY25 Long Lead - Landing Gear Assembly (Nose & Mains) 2024 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Dec 2023 Apr 2026 15 692.667 Y May 2022 FY25 Long Lead - Rotary Wing Head Damper/Hub Assembly 2024 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Dec 2023 Jan 2026 15 632.400 Y May 2022 FY25 Long Lead - Main Rotor Servo 2024 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Dec 2023 Oct 2025 15 557.467 Y May 2022 FY25 Long Lead - APU Engine Assembly 2024 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Dec 2023 Sep 2025 9 647.778 Y May 2022 FY25 Long Lead - Hub Subassembly Forgings 2024 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Dec 2023 Apr 2026 15 322.733 Y May 2022 FY26 Long Lead - FWD Fuselage Structural Assembly 2025 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2025 Aug 2027 10 7,898.700 Y May 2023 FY26 Long Lead - Transition Structural Assembly 2025 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2025 Jun 2027 10 2,399.600 Y May 2023 FY26 Long Lead - Tail Pylon Assembly 2025 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2025 Oct 2027 10 1,273.200 Y May 2023 FY26 Long Lead - Collective/Cyclic Inceptors 2025 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2025 Feb 2027 10 845.200 Y May 2023 FY26 Long Lead - Landing Gear Assembly (Nose & Mains) 2025 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2025 May 2027 10 783.100 Y May 2023 FY26 Long Lead - Rotary Wing Head Damper/Hub Assembly 2025 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2025 Feb 2027 10 714.900 Y May 2023 FY26 Long Lead - Main Rotor Servo 2025 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2025 Nov 2026 10 630.300 Y May 2023 FY26 Long Lead - APU Engine Assembly 2025 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2025 Oct 2026 6 732.333 Y May 2023 FY26 Long Lead - Hub Subassembly Forgings 2025 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2025 May 2027 10 364.900 Y May 2023 Cost Elements O O C P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) LI 0158 - CH-53K (Heavy Lift) Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 6 of 16 P-1 Line #6 Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date Volume 1 - 74 === page 125 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Item Number / Title [DODIC]: 1 / CH-53K (Heavy Lift) FY Contractor and Location Method/Type or Funding Vehicle FY27 Long Lead - FWD Fuselage Structural Assembly 2026 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2026 Aug 2028 10 8,518.600 Y May 2024 FY27 Long Lead - Transition Structural Assembly 2026 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2026 Jun 2028 10 2,588.000 Y May 2024 FY27 Long Lead - Tail Pylon Assembly 2026 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2026 Oct 2028 10 1,373.100 Y May 2024 FY27 Long Lead - Collective/Cyclic Inceptors 2026 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2026 Feb 2028 10 911.500 Y May 2024 FY27 Long Lead - Landing Gear Assembly (Nose & Mains) 2026 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2026 May 2028 10 844.500 Y May 2024 FY27 Long Lead - Rotary Wing Head Damper/Hub Assembly 2026 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2026 Feb 2028 10 771.100 Y May 2024 FY27 Long Lead - Main Rotor Servo 2026 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2026 Nov 2027 10 679.700 Y May 2024 FY27 Long Lead - APU Engine Assembly 2026 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2026 Oct 2027 6 789.833 Y May 2024 FY27 Long Lead - Hub Subassembly Forgings 2026 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2026 May 2028 10 393.500 Y May 2024 FY28 Long Lead - FWD Fuselage Structural Assembly 2027 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2027 Aug 2029 15 7,133.267 Y May 2025 FY28 Long Lead - Transition Structural Assembly 2027 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2027 Jun 2029 15 2,167.133 Y May 2025 FY28 Long Lead - Tail Pylon Assembly 2027 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2027 Oct 2029 15 1,149.800 Y May 2025 FY28 Long Lead - Collective/Cyclic Inceptors 2027 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2027 Feb 2029 15 763.267 Y May 2025 FY28 Long Lead - Landing Gear Assembly (Nose & Mains) 2027 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2027 May 2029 15 707.200 Y May 2025 FY28 Long Lead - Rotary Wing Head Damper/Hub Assembly 2027 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2027 Feb 2029 15 645.667 Y May 2025 FY28 Long Lead - Main Rotor Servo 2027 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2027 Nov 2028 15 569.200 Y May 2025 FY28 Long Lead - APU Engine Assembly 2027 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2027 Oct 2028 9 661.444 Y May 2025 FY28 Long Lead - Hub Subassembly Forgings 2027 Sikorsky A/C Corp / Stratford, CT SS / FPIF NAVAIR Jan 2027 May 2029 15 329.467 Y May 2025 FY23 Long Lead GFE APR39D(V)2 Radar Target Data Processor 2022 Northrop Grumman / Rolling Meadows, IL SS / FPIF NAVAIR Mar 2022 Sep 2023 10 905.900 Y Sep 2019 Cost Elements O O C P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) LI 0158 - CH-53K (Heavy Lift) Navy Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 7 of 16 P-1 Line #6 Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date Volume 1 - 75 === page 126 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements O O C P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / CH-53K (Heavy Lift) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty RFP Issue Date FY Contractor and Location FY23 Long Lead GFE APR39D(V)2 Radar Receiver 2022 Northrop Grumman / Rolling Meadows, IL SS / FPIF NAVAIR Mar 2022 Sep 2023 30 71.667 Y Sep 2019 FY23 Long Lead GFE - DIRCM Guardian Laser Transmitter Asy (GLTA) 2022 Northrop Grumman / Rolling Meadows, IL SS / IDIQ NAVAIR Mar 2022 Sep 2023 20 721.700 Y Dec 2020 FY23 Long Lead GFE - Advance Threat Warning Sensor (ATW) 2022 Northrop Grumman / Rolling Meadows, IL SS / IDIQ NAVAIR Mar 2022 Sep 2023 50 163.480 Y Dec 2020 FY23 Long Lead GFE - LAIRCM System Processor Replacement (LSPR) 2022 Northrop Grumman / Rolling Meadows, IL SS / FFP USAF Apr 2022 Oct 2023 10 453.200 Y Aug 2019 FY24 Long Lead GFE APR39D(V)2 Radar Target Data Processor 2023 Northrop Grumman / Rolling Meadows, IL SS / FPIF NAVAIR Feb 2023 Aug 2024 15 1,009.667 Y Sep 2019 FY24 Long Lead GFE APR39D(V)2 Radar Receiver 2023 Northrop Grumman / Rolling Meadows, IL SS / FPIF NAVAIR Feb 2023 Aug 2024 45 93.511 Y Sep 2019 FY24 Long Lead GFE - DIRCM Guardian Laser Transmitter Asy (GLTA) 2023 Northrop Grumman / Rolling Meadows, IL SS / IDIQ NAVAIR Jan 2023 Jul 2024 30 675.800 Y Dec 2020 FY24 Long Lead GFE - Advance Threat Warning Sensor (ATW) 2023 Northrop Grumman / Rolling Meadows, IL SS / IDIQ NAVAIR Jan 2023 Jul 2024 75 171.467 Y Dec 2020 FY24 Long Lead GFE - LAIRCM System Processor Replacement (LSPR) 2023 Northrop Grumman / Rolling Meadows, IL SS / FFP USAF Apr 2023 Oct 2024 15 498.800 Y Aug 2019 FY25 Long Lead GFE APR39D(V)2 Radar Target Data Processor 2024 Northrop Grumman / Rolling Meadows, IL SS / FPIF NAVAIR May 2025 Nov 2026 17 959.118 Y Sep 2023 FY25 Long Lead GFE APR39D(V)2 Radar Receiver 2024 Northrop Grumman / Rolling Meadows, IL SS / FPIF NAVAIR May 2025 Nov 2026 51 88.824 Y Sep 2023 FY25 Long Lead GFE - DIRCM Guardian Laser Transmitter Asy (GLTA) 2024 Northrop Grumman / Rolling Meadows, IL SS / IDIQ NAVAIR Jul 2024 Jan 2026 34 642.000 Y Dec 2022 FY25 Long Lead GFE - Advance Threat Warning Sensor (ATW) 2024 Northrop Grumman / Rolling Meadows, IL SS / IDIQ NAVAIR Jul 2024 Jan 2026 85 162.882 Y Dec 2022 FY25 Long Lead GFE - LAIRCM System Processor Replacement (LSPR) 2024 Northrop Grumman / Rolling Meadows, IL SS / FFP USAF Jul 2024 Jan 2026 17 473.824 Y Aug 2023 FY26 Long Lead GFE APR39D(V)2 Radar Target Data Processor 2025 Northrop Grumman / Rolling Meadows, IL SS / FPIF NAVAIR May 2025 Nov 2026 12 1,083.750 Y Sep 2023 FY26 Long Lead GFE APR39D(V)2 Radar Receiver 2025 Northrop Grumman / Rolling Meadows, IL SS / FPIF NAVAIR May 2025 Nov 2026 36 100.361 Y Sep 2023 LI 0158 - CH-53K (Heavy Lift) Navy UNCLASSIFIED Page 8 of 16 P-1 Line #6 (Each) Volume 1 - 76 === page 127 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (†) O O C P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / CH-53K (Heavy Lift) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty RFP Issue Date FY Contractor and Location FY26 Long Lead GFE - DIRCM Guardian Laser Transmitter Asy (GLTA) 2025 Northrop Grumman / Rolling Meadows, IL SS / IDIQ NAVAIR May 2025 Nov 2026 24 725.417 Y Dec 2022 FY26 Long Lead GFE - Advance Threat Warning Sensor (ATW) 2025 Northrop Grumman / Rolling Meadows, IL SS / IDIQ NAVAIR May 2025 Nov 2026 60 184.050 Y Dec 2022 FY26 Long Lead GFE - LAIRCM System Processor Replacement (LSPR) 2025 Northrop Grumman / Rolling Meadows, IL SS / IDDQ NAVAIR May 2025 Nov 2026 12 535.417 Y Dec 2022 FY27 Long Lead GFE APR39D(V)2 Radar Target Data Processor 2026 Northrop Grumman / Rolling Meadows, IL SS / FPIF NAVAIR Feb 2026 Aug 2027 17 590.706 Y Sep 2023 FY27 Long Lead GFE APR39D(V)2 Radar Receiver 2026 Northrop Grumman / Rolling Meadows, IL SS / FPIF NAVAIR Feb 2026 Aug 2027 51 54.706 Y Sep 2023 FY27 Long Lead GFE - DIRCM Guardian Laser Transmitter Asy (GLTA) 2026 Northrop Grumman / Rolling Meadows, IL SS / IDIQ NAVAIR Mar 2026 Sep 2027 34 395.412 Y Dec 2022 FY27 Long Lead GFE - Advance Threat Warning Sensor (ATW) 2026 Northrop Grumman / Rolling Meadows, IL SS / IDIQ NAVAIR Mar 2026 Sep 2027 85 100.318 Y Dec 2022 FY27 Long Lead GFE - LAIRCM System Processor Replacement (LSPR) 2026 Northrop Grumman / Rolling Meadows, IL SS / IDDQ NAVAIR Mar 2026 Sep 2027 17 291.824 Y Dec 2022 FY28 Long Lead GFE APR39D(V)2 Radar Target Data Processor 2027 Northrop Grumman / Rolling Meadows, IL SS / FPIF NAVAIR Feb 2027 Aug 2028 19 598.579 Y Sep 2023 FY28 Long Lead GFE APR39D(V)2 Radar Receiver 2027 Northrop Grumman / Rolling Meadows, IL SS / FPIF NAVAIR Feb 2027 Aug 2028 57 55.439 Y Sep 2023 FY28 Long Lead GFE - DIRCM Guardian Laser Transmitter Asy (GLTA) 2027 Northrop Grumman / Rolling Meadows, IL SS / IDIQ NAVAIR Mar 2027 Sep 2028 38 400.658 Y Dec 2022 FY28 Long Lead GFE - Advance Threat Warning Sensor (ATW) 2027 Northrop Grumman / Rolling Meadows, IL SS / IDIQ NAVAIR Mar 2027 Sep 2028 95 101.653 Y Dec 2022 FY28 Long Lead GFE - LAIRCM System Processor Replacement (LSPR) 2027 Northrop Grumman / Rolling Meadows, IL SS / IDIQ NAVAIR Mar 2027 Sep 2028 19 295.684 Y Dec 2022 (Each) indicates the presence of a P-21 LI 0158 - CH-53K (Heavy Lift) Navy UNCLASSIFIED Page 9 of 16 P-1 Line #6 Volume 1 - 77 === page 128 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / CH-53K (Heavy Lift) Fiscal Year 2021 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT Calendar Year 2021 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2022 M A Y J U N J U L Calendar Year 2022 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 20 1 2021 NAVY 9 0 9 1 2022 NAVY 11 0 11 1 2023 NAVY 12 0 12 12 1 2024 NAVY 15 0 15 15 1 2025 NAVY 18 0 18 18 1 2026 NAVY 14 0 14 14 1 2027 NAVY 22 0 22 22 1.1.2) Engines A - - - - - - - - - - - - - - - - 9 A - - - - - - - - 11 (2) Prior Years Deliveries: 84 2 2022 NAVY 33 0 33 33 2 2023 NAVY 36 0 36 36 2 2024 NAVY 45 0 45 45 2 2025 NAVY 54 0 54 54 2 2026 NAVY 42 0 42 42 2 2027 NAVY 66 0 66 66 O C T LI 0158 - CH-53K (Heavy Lift) Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #6 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 78 === page 129 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / CH-53K (Heavy Lift) Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 20 1 2021 NAVY 9 0 9 - - - - - - - - - - - - - - - - - - - - - - - - 9 1 2022 NAVY 11 0 11 - - - - - - - - - - - - - - - - - - - - - - - - 11 1 2023 NAVY 12 0 12 A - - - - - - - - - - - - - - 12 1 2024 NAVY 15 0 15 A - - - - - 15 1 2025 NAVY 18 0 18 18 1 2026 NAVY 14 0 14 14 1 2027 NAVY 22 0 22 22 1.1.2) Engines (2) Prior Years Deliveries: 84 2 2022 NAVY 33 0 33 A - - - - - - - - - - - - - - - - - - 33 2 2023 NAVY 36 0 36 A - - - - - - - - - - - - - - - - - - 36 2 2024 NAVY 45 0 45 A - - - - - - - - 45 2 2025 NAVY 54 0 54 54 2 2026 NAVY 42 0 42 42 2 2027 NAVY 66 0 66 66 O C T LI 0158 - CH-53K (Heavy Lift) Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #6 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 79 === page 130 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / CH-53K (Heavy Lift) Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 20 1 2021 NAVY 9 0 9 - - - - - - - - - - - - - - - - - - - - 1 2022 NAVY 11 0 11 - - - - - - - - - - - - - - - - - - - - - - - - 11 1 2023 NAVY 12 0 12 - - - - - - - - - - - - - - - - - - - - - - - - 12 1 2024 NAVY 15 0 15 - - - - - - - - - - - - - - - - - - - - - - - - 15 1 2025 NAVY 18 0 18 A - - - - - - - - - - - - - 18 1 2026 NAVY 14 0 14 A - - - - - - - - - - 14 1 2027 NAVY 22 0 22 1.1.2) Engines 1 1 1 1 5 22 (2) Prior Years Deliveries: 84 2 2022 NAVY 33 0 33 - - - - - - - - - - - - - - - - - - - - - 2 2023 NAVY 36 0 36 - - - - - - - - - - - - - - - - - - - - - - - - 36 2 2024 NAVY 45 0 45 - - - - - - - - - - - - - - - - - - - - - - - - 45 2 2025 NAVY 54 0 54 A - - - - - - - - - 54 2 2026 NAVY 42 0 42 A - - - - - - - - - 42 2 2027 NAVY 66 0 66 3 3 21 66 O C T LI 0158 - CH-53K (Heavy Lift) Navy 6 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #6 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 80 === page 131 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / CH-53K (Heavy Lift) Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 20 1 2021 NAVY 9 4 5 1 2022 NAVY 11 0 11 - - - - - 1 2023 NAVY 12 0 12 - - - - - - - - - - - - 1 2024 NAVY 15 0 15 - - - - - - - - - - - - - - - - - - - - 1 2025 NAVY 18 0 18 - - - - - - - - - - - - - - - - - - - - - - - - 18 1 2026 NAVY 14 0 14 - - - - - - - - - - - - - - - - - - - - - - - - 14 1 2027 NAVY 22 0 22 A - - - - - - - - - - - - - - - - - - - - - - 22 1.1.2) Engines 1 1 1 1 1 0 2 1 1 2 1 1 2 1 0 1 1 2 1 2 1 1 2 1 0 1 2 2 1 9 (2) Prior Years Deliveries: 84 2 2022 NAVY 33 12 21 2 2023 NAVY 36 0 36 - 6 - - - 2 2024 NAVY 45 0 45 - - - - - - - - - - - - 2 2025 NAVY 54 0 54 - - - - - - - - - - - - - - - - - - - - - - 2 2026 NAVY 42 0 42 - - - - - - - - - - - - - - - - - - - - - - - - 42 2 2027 NAVY 66 0 66 A - - - - - - - - - - - - - - - - - - - - - - - - 66 O C T LI 0158 - CH-53K (Heavy Lift) Navy 3 N O V 3 D E C 6 J A N 3 0 3 F E B 3 M A R 6 A P R 3 M A Y 6 J U N 3 J U L 3 A U G UNCLASSIFIED Page 13 of 16 6 S E P 3 0 3 O C T 6 N O V 6 D E C 3 J A N 6 F E B P-1 Line #6 3 M A R 6 A P R 6 M A Y 3 J U N 3 J U L 0 3 A U G 3 48 S E P Volume 1 - 81 === page 132 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / CH-53K (Heavy Lift) Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 20 1 2021 NAVY 9 9 0 0 1 2022 NAVY 11 11 0 0 1 2023 NAVY 12 12 0 1 2024 NAVY 15 6 9 1 2025 NAVY 18 0 18 - - - - - - 1 2026 NAVY 14 0 14 - - - - - - - - - - - - - - - - - - 1 2027 NAVY 22 0 22 - - - - - - - - - - - - - - - - - - 1.1.2) Engines 0 2 1 2 2 1 1 0 1 1 2 1 1 2 1 1 2 2 2 2 0 1 1 - 2 - 1 - 1 - 2 - - 6 22 (2) Prior Years Deliveries: 84 2 2022 NAVY 33 33 0 0 2 2023 NAVY 36 36 0 0 2 2024 NAVY 45 45 0 2 2025 NAVY 54 6 48 2 2026 NAVY 42 0 42 - - - - - - - - - - 2 2027 NAVY 66 0 66 - - - - - - - - - - 0 6 O C T LI 0158 - CH-53K (Heavy Lift) Navy 3 N O V 3 D E C 6 J A N 3 F E B 3 M A R 6 A P R 6 M A Y 6 J U N 6 J U L 0 3 3 A U G UNCLASSIFIED Page 14 of 16 6 S E P 3 O C T 3 N O V 6 D E C 3 J A N 3 F E B P-1 Line #6 3 M A R 3 A P R 3 M A Y 3 J U N 0 J U L 6 A U G 6 54 S E P Volume 1 - 82 === page 133 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / CH-53K (Heavy Lift) Fiscal Year 2031 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2030 1 OCT Fiscal Year 2032 Calendar Year 2031 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2032 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 20 1 2021 NAVY 9 9 0 0 1 2022 NAVY 11 11 0 0 1 2023 NAVY 12 12 0 0 1 2024 NAVY 15 15 0 0 1 2025 NAVY 18 18 0 1 2026 NAVY 14 8 6 1 2027 NAVY 22 0 22 1.1.2) Engines 0 1 1 - 1 - 1 - 1 - 1 - 0 - 2 2 2 1 2 2 2 1 2 2 2 2 0 (2) Prior Years Deliveries: 84 2 2022 NAVY 33 33 0 0 2 2023 NAVY 36 36 0 0 2 2024 NAVY 45 45 0 0 2 2025 NAVY 54 54 0 0 2 2026 NAVY 42 42 0 2 2027 NAVY 66 12 54 0 6 O C T LI 0158 - CH-53K (Heavy Lift) Navy 3 N O V 6 D E C 6 J A N 6 F E B 3 M A R 6 A P R 6 M A Y 6 J U N 6 J U L 0 A U G UNCLASSIFIED Page 15 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #6 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 83 === page 134 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Item Number / Title [DODIC]: 1 / CH-53K (Heavy Lift) Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Sikorsky A/C Corp - Stratford, CT 12 17 24 0 10 50 60 0 2 52 54 2 General Electric Company Lynn, MA 26 72 90 0 13 21 34 0 1 46 47 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0158 - CH-53K (Heavy Lift) Navy UNCLASSIFIED Page 16 of 16 P-1 Line #6 Volume 1 - 84 === page 135 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat Aircraft P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) Program Elements for Code B Items: N/A Other Related Program Elements: 0605212M Line Item MDAP/MAIS Code: 390 Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Gross/Weapon System Cost ($ in Millions) 1,669.951 422.971 335.352 429.295 - 429.295 515.736 381.595 339.428 353.380 - 4,447.708 Net Procurement (P-1) ($ in Millions) 1,669.951 422.971 335.352 429.295 - 429.295 515.736 381.595 339.428 353.380 - 4,447.708 Total Obligation Authority ($ in Millions) 1,669.951 422.971 335.352 429.295 - 429.295 515.736 381.595 339.428 353.380 - 4,447.708 Description: The CH-53 is the only marinized heavy-lift helicopter in the world and is the Marine Corps only heavy-lift helicopter. The CH-53 mission is the conduct of expeditionary heavy-lift assault transport of armored vehicles, equipment and personnel to support distributed operations deep inland from a sea-based center of operations. The CH-53E "Super Stallion", introduced in 1980, has developed performance degradation, fatigue life, interoperability, maintenance supportability, and other operational concerns. The CH-53K "King Stallion" is designed to address these concerns and support Marine Air-Ground Task Force heavy-lift requirements in the 21st century joint environment and is the only heavy-lift platform that can lift the Marine Air-Ground Task Force ashore. The CH-53K provides significant improvements in range and payload, performance, cargo handling, turn-around times, reliability and maintainability, interoperability and survivability. The CH-53K System Development and Demonstration program received a successful Milestone C decision on 4 April 2017. The CH-53K Production program received approval on 22 December 2022 to proceed to Full Rate Production. LI 0158 - CH-53K (Heavy Lift) Navy UNCLASSIFIED Page 1 of 13 P-1 Line #7 Volume 1 - 85 === page 136 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat Aircraft P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) Program Elements for Code B Items: N/A Other Related Program Elements: 0605212M Line Item MDAP/MAIS Code: 390 Exhibits Schedule Exhibit Type Title* ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-10 1 / CH-53K (Heavy Lift) 67 / 1,669.951 18 / 422.971 14 / 335.352 22 / 429.295 - / - 22 / 429.295 P-40 Total Gross/Weapon System Cost 67 / 1,669.951 18 / 422.971 14 / 335.352 22 / 429.295 - / - 22 / 429.295 *Title represents the P-10 Title for Advance Procurement. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Advanced Procurement (AP) is required for long-lead materials associated with the procurement of Full Rate Production (FRP) Lot 12 in FY 2028. AP is used to procure long-lead materials and aircraft components with an extended production lead-time. These long-lead requirements are essential to establishing and maintaining a production schedule in support of the Marine Aviation Plan and Marine Air-Ground Task Force CH-53E replacement schedule. Procurement of long-lead items is determined based upon component lead time and the need date for those materials incorporation into the production line build sequence. As such, not all aircraft being procured in a given lot require AP funding. Due to the level of detail now captured in this exhibit, AP requirements will need to be adjusted more frequently as the impact of factors such as inflation, additional production capacity, and shorter build times become known. Full funding for every end item requesting advance procurement is included in the budget submission. LI 0158 - CH-53K (Heavy Lift) Navy UNCLASSIFIED Page 2 of 13 P-1 Line #7 Volume 1 - 86 === page 137 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 First System (2027) Award Date: January 2027 P-5 Number / Title: 1 / CH-53K (Heavy Lift) First System (2027) Completion Date: April 2031 Production Leadtime CH-53K (Heavy Lift) Interval Between Systems: 1 Months Prior Years (Months) FY 2025 (Each) 67 When Required Prior Years (Months) FY 2026 (Each) Quantity Cost Elements Date: April 2026 18 FY 2025 ($ M) FY 2027 (Each) (Each) 14 FY 2026 ($ M) 22 FY 2027 ($ M) ($ M) CFE FY17 Long Lead 0 31.219 - - - FY18 Long Lead 0 55.566 - - - FY19 Long Lead 0 126.992 - - - FY20 Long Lead 0 107.354 - - - FY21 Long Lead 0 215.014 - - - FY22 Long Lead 0 155.241 - - - 0 83.690 - - - 0 25.425 - - - 0 14.989 - - - 17.676 - - - 0 96.633 - - - 0 29.357 - - - 0 15.576 - - - 0 10.340 - - - 9.580 - - - 8.747 - - - 0 7.711 - - - 0 5.376 - - - 0 4.463 - - - 80.466 - - - FY23 Long Lead - FWD Fuselage Structural Assembly FY23 Long Lead - Transition Structural Assembly FY23 Long Lead - Tail Pylon Assembly (†) (†) (†) FY23 Long Lead - Other General Procurements/ Subassembly Components 0 FY24 Long Lead - FWD Fuselage Structural Assembly FY24 Long Lead - Transition Structural Assembly FY24 Long Lead - Tail Pylon Assembly (†) (†) (†) FY24 Long Lead - Collective/Cyclic Inceptors (†) FY24 Long Lead - Landing Gear Assembly (Nose & Mains) (†) 0 FY24 Long Lead - Rotary Wing Head Damper/Hub Assembly (†) FY24 Long Lead - Main Rotor Servo 0 (†) FY24 Long Lead - APU Engine Assembly (†) FY24 Long Lead - Hub Subassembly Forgings (†) FY24 Long Lead - Other General Procurements/ Subassembly Parts LI 0158 - CH-53K (Heavy Lift) Navy 0 UNCLASSIFIED Page 3 of 13 P-1 Line #7 Volume 1 - 87 === page 138 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 First System (2027) Award Date: January 2027 First System (2027) Completion Date: April 2031 When Required Cost Elements FY25 Long Lead - FWD Fuselage Structural Assembly FY25 Long Lead - Transition Structural Assembly FY25 Long Lead - Tail Pylon Assembly (†) (†) (†) FY25 Long Lead - Collective/Cyclic Inceptors (†) FY 2025 ($ M) FY25 Long Lead - Main Rotor Servo - - 0 31.838 - - - 0 16.892 - - - 0 11.214 - - - 10.390 - - - 9.486 - - - 0 8.362 - - - 0 5.830 - - - 0 4.841 - - - 92.339 - - - 0 - 78.987 - - 0 - 23.996 - - 0 - 12.732 - - 0 - 8.452 - - - 7.831 - - - 7.149 - - 0 - 6.303 - - 0 - 4.394 - - 0 - 3.649 - - - 78.959 - - - - 85.186 - 0 (†) FY25 Long Lead - APU Engine Assembly (†) FY25 Long Lead - Hub Subassembly Forgings (†) FY25 Long Lead - Other General Procurements/ Subassembly Parts 0 FY26 Long Lead - FWD Fuselage Structural Assembly FY26 Long Lead - Transition Structural Assembly FY26 Long Lead - Tail Pylon Assembly (†) (†) (†) FY26 Long Lead - Collective/Cyclic Inceptors (†) FY26 Long Lead - Landing Gear Assembly (Nose & Mains) (†) 0 FY26 Long Lead - Rotary Wing Head Damper/Hub Assembly (†) FY26 Long Lead - Main Rotor Servo 0 (†) FY26 Long Lead - APU Engine Assembly (†) FY26 Long Lead - Hub Subassembly Forgings (†) FY26 Long Lead - Other General Procurements/ Subassembly Parts FY27 Long Lead - FWD Fuselage Structural Assembly LI 0158 - CH-53K (Heavy Lift) Navy 0 (†) ($ M) - 0 (†) FY 2027 ($ M) 104.797 FY25 Long Lead - Rotary Wing Head Damper/Hub Assembly FY 2026 ($ M) 0 FY25 Long Lead - Landing Gear Assembly (Nose & Mains) (†) P-5 Number / Title: 1 / CH-53K (Heavy Lift) Interval Between Systems: 1 Months Prior Years (Months) Date: April 2026 0 UNCLASSIFIED Page 4 of 13 P-1 Line #7 Volume 1 - 88 === page 139 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 First System (2027) Award Date: January 2027 First System (2027) Completion Date: April 2031 When Required Cost Elements FY27 Long Lead - Transition Structural Assembly FY27 Long Lead - Tail Pylon Assembly (†) (†) FY27 Long Lead - Collective/Cyclic Inceptors (†) (†) FY27 Long Lead - APU Engine Assembly (†) FY27 Long Lead - Hub Subassembly Forgings (†) FY27 Long Lead - Other General Procurements/ Subassembly Parts 25.880 - 0 - - 13.731 - 0 - - 9.115 - - - 8.445 - - - 7.711 - 0 - - 6.797 - 0 - - 4.739 - 0 - - 3.935 - - - 85.156 - 0 - - - 106.999 0 - - - 32.507 0 - - - 17.247 0 - - - 11.449 - - - 10.608 - - - 9.685 0 - - - 8.538 0 - - - 5.953 0 - - - 4.942 - - - 110.100 0 FY28 Long Lead - FWD Fuselage Structural Assembly FY28 Long Lead - Transition Structural Assembly FY28 Long Lead - Tail Pylon Assembly (†) (†) (†) FY28 Long Lead - Collective/Cyclic Inceptors (†) FY28 Long Lead - Landing Gear Assembly (Nose & Mains) (†) 0 FY28 Long Lead - Rotary Wing Head Damper/Hub Assembly (†) 0 FY28 Long Lead - Main Rotor Servo (†) FY28 Long Lead - APU Engine Assembly (†) FY28 Long Lead - Hub Subassembly Forgings (†) FY28 Long Lead - Other General Procurements/ Subassembly Parts (17) ($ M) - 0 FY27 Long Lead - Main Rotor Servo FY 2027 ($ M) - 0 (†) FY 2026 ($ M) 0 FY27 Long Lead - Rotary Wing Head Damper/Hub Assembly FY 2025 ($ M) FY27 Long Lead - Landing Gear Assembly (Nose & Mains) (†) P-5 Number / Title: 1 / CH-53K (Heavy Lift) Interval Between Systems: 1 Months Prior Years (Months) Date: April 2026 0 FY26 EOQ Airframe - Lot 10 0 - 20.380 - - FY27 EOQ Airframe - Lot 11 0 - 21.653 - - LI 0158 - CH-53K (Heavy Lift) Navy UNCLASSIFIED Page 5 of 13 P-1 Line #7 Volume 1 - 89 === page 140 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 First System (2027) Award Date: January 2027 First System (2027) Completion Date: April 2031 When Required Cost Elements P-5 Number / Title: 1 / CH-53K (Heavy Lift) Interval Between Systems: 1 Months Prior Years (Months) Date: April 2026 FY 2025 ($ M) FY 2026 ($ M) FY 2027 ($ M) ($ M) FY28 EOQ Airframe - Lot 12 0 - 25.475 - FY29 EOQ Airframe - Lot 13 0 - 28.022 - Total: CFE 1,397.404 327.982 250.695 318.028 GFE GFE - Miscellaneous 0 35.713 - - - 9.059 - - - 2.150 - - - 14.434 - - - 8.174 - - - 4.532 - - - 2.774 - - - 15.145 - - - 4.208 - - - 20.274 - - - 12.860 - - - 7.482 - - - 13.474 - - - 43.199 - - - 16.305 - - - FY23 Long Lead GFE - APR39D(V)2 Radar Target Data Processor (†) 0 FY23 Long Lead GFE - APR39D(V)2 Radar Receiver (†) 0 FY23 Long Lead GFE - DIRCM Guardian Laser Transmitter Asy (GLTA) (†) 0 FY23 Long Lead GFE - Advance Threat Warning Sensor (ATW) (†) 0 FY23 Long Lead GFE - LAIRCM System Processor Replacement (LSPR) (†) 0 FY23 Long Lead GFE - Other General Procurements/ Subassembly Parts 0 FY24 Long Lead GFE - APR39D(V)2 Radar Target Data Processor (†) 0 FY24 Long Lead GFE - APR39D(V)2 Radar Receiver (†) 0 FY24 Long Lead GFE - DIRCM Guardian Laser Transmitter Asy (GLTA) (†) 0 FY24 Long Lead GFE - Advance Threat Warning Sensor (ATW) (†) 0 FY24 Long Lead GFE - LAIRCM System Processor Replacement (LSPR) (†) 0 FY24 Long Lead GFE - Other General Procurements/ Subassembly Parts 0 FY25 Long Lead - T408 0 FY25 Long Lead GFE - APR39D(V)2 Radar Target Data Processor (†) LI 0158 - CH-53K (Heavy Lift) Navy 0 UNCLASSIFIED Page 6 of 13 P-1 Line #7 Volume 1 - 90 === page 141 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 First System (2027) Award Date: January 2027 First System (2027) Completion Date: April 2031 When Required Cost Elements FY25 Long Lead GFE - APR39D(V)2 Radar Receiver (†) Asy (GLTA) (†) 0 (†) 0 (†) 0 FY26 Long Lead - T408 0 - - 21.828 - - - 13.845 - - - 8.055 - - - 14.506 - - - - 32.313 - - - 13.005 - - - 3.613 - - - 17.410 - - - 11.043 - - - 6.425 - - - 11.180 - - - - 35.958 - - - 10.042 - - - 2.790 - - - 13.444 - - - 8.527 - FY26 Long Lead GFE - APR39D(V)2 Radar Target Data Processor (†) 0 FY26 Long Lead GFE - APR39D(V)2 Radar Receiver (†) 0 FY26 Long Lead GFE - DIRCM Guardian Laser Transmitter Asy (GLTA) (†) 0 FY26 Long Lead GFE - Advance Threat Warning Sensor (ATW) (†) 0 FY26 Long Lead GFE - LAIRCM System Processor Replacement (LSPR) (†) 0 FY26 Long Lead GFE - Other General Procurements/ Subassembly Parts 0 FY27 Long Lead - T408 0 FY27 Long Lead GFE - APR39D(V)2 Radar Target Data Processor (†) FY27 Long Lead GFE - APR39D(V)2 Radar Receiver 0 (†) 0 FY27 Long Lead GFE - DIRCM Guardian Laser Transmitter Asy (GLTA) (†) 0 FY27 Long Lead GFE - Advance Threat Warning Sensor (ATW) (†) LI 0158 - CH-53K (Heavy Lift) Navy ($ M) - 0 FY25 Long Lead GFE - Other General Procurements/ Subassembly Parts FY 2027 ($ M) 4.530 FY25 Long Lead GFE - LAIRCM System Processor Replacement (LSPR) FY 2026 ($ M) 0 FY25 Long Lead GFE - Advance Threat Warning Sensor (ATW) FY 2025 ($ M) FY25 Long Lead GFE - DIRCM Guardian Laser Transmitter P-5 Number / Title: 1 / CH-53K (Heavy Lift) Interval Between Systems: 1 Months Prior Years (Months) Date: April 2026 0 UNCLASSIFIED Page 7 of 13 P-1 Line #7 Volume 1 - 91 === page 142 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 First System (2027) Award Date: January 2027 First System (2027) Completion Date: April 2031 When Required Cost Elements FY 2025 ($ M) (†) 0 FY27 Long Lead GFE - Other General Procurements/ Subassembly Parts 0 FY28 Long Lead - T408 0 FY28 Long Lead GFE - APR39D(V)2 Radar Target Data Processor (†) 0 FY28 Long Lead GFE - APR39D(V)2 Radar Receiver (†) 0 FY28 Long Lead GFE - DIRCM Guardian Laser Transmitter Asy (GLTA) (18) (†) 0 FY28 Long Lead GFE - Advance Threat Warning Sensor (ATW) (†) 0 FY28 Long Lead GFE - LAIRCM System Processor Replacement (LSPR) (19) (†) 0 FY28 Long Lead GFE - Other General Procurements/ Subassembly Parts (20) Total: GFE Total Advance Procurement/Obligation Authority LI 0158 - CH-53K (Heavy Lift) Navy FY 2026 ($ M) FY27 Long Lead GFE - LAIRCM System Processor Replacement (LSPR) P-5 Number / Title: 1 / CH-53K (Heavy Lift) Interval Between Systems: 1 Months Prior Years (Months) Date: April 2026 0 FY 2027 ($ M) ($ M) - - 4.961 - - - 8.935 - - - - 56.116 - - - 11.373 - - - 3.160 - - - 15.225 - - - 9.657 - - - 5.618 - - - 10.118 272.547 94.989 84.657 111.267 1,669.951 422.971 335.352 429.295 UNCLASSIFIED Page 8 of 13 P-1 Line #7 Volume 1 - 92 === page 143 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) Date: April 2026 P-5 Number / Title: 1 / CH-53K (Heavy Lift) FY 2027 Production Leadtime QPA Cost Elements (Months) (Each) Unit Cost ($ K) Contract Forecast Date 2027 Qty (Each) For FY Total Cost Request ($ M) CFE FY17 Long Lead 0 - FY18 Long Lead 0 - FY19 Long Lead 0 - FY20 Long Lead 0 - FY21 Long Lead 0 - FY22 Long Lead 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - FY23 Long Lead - FWD Fuselage Structural Assembly FY23 Long Lead - Transition Structural Assembly FY23 Long Lead - Tail Pylon Assembly (†) (†) (†) FY23 Long Lead - Other General Procurements/Subassembly Components FY24 Long Lead - FWD Fuselage Structural Assembly FY24 Long Lead - Transition Structural Assembly FY24 Long Lead - Tail Pylon Assembly (†) (†) (†) FY24 Long Lead - Collective/Cyclic Inceptors (†) FY24 Long Lead - Landing Gear Assembly (Nose & Mains) (†) FY24 Long Lead - Rotary Wing Head Damper/Hub Assembly FY24 Long Lead - Main Rotor Servo (†) (†) FY24 Long Lead - APU Engine Assembly (†) FY24 Long Lead - Hub Subassembly Forgings (†) FY24 Long Lead - Other General Procurements/Subassembly Parts FY25 Long Lead - FWD Fuselage Structural Assembly FY25 Long Lead - Transition Structural Assembly FY25 Long Lead - Tail Pylon Assembly (†) (†) (†) FY25 Long Lead - Collective/Cyclic Inceptors (†) FY25 Long Lead - Landing Gear Assembly (Nose & Mains) LI 0158 - CH-53K (Heavy Lift) Navy (†) UNCLASSIFIED Page 9 of 13 P-1 Line #7 Volume 1 - 93 === page 144 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) Date: April 2026 P-5 Number / Title: 1 / CH-53K (Heavy Lift) FY 2027 QPA Cost Elements (†) (†) FY25 Long Lead - APU Engine Assembly (†) FY25 Long Lead - Hub Subassembly Forgings (†) FY25 Long Lead - Other General Procurements/Subassembly Parts FY26 Long Lead - FWD Fuselage Structural Assembly FY26 Long Lead - Transition Structural Assembly FY26 Long Lead - Tail Pylon Assembly (†) (†) (†) FY26 Long Lead - Collective/Cyclic Inceptors (†) FY26 Long Lead - Landing Gear Assembly (Nose & Mains) (†) FY26 Long Lead - Rotary Wing Head Damper/Hub Assembly FY26 Long Lead - Main Rotor Servo (†) (†) FY26 Long Lead - APU Engine Assembly (†) FY26 Long Lead - Hub Subassembly Forgings (†) FY26 Long Lead - Other General Procurements/Subassembly Parts FY27 Long Lead - FWD Fuselage Structural Assembly FY27 Long Lead - Transition Structural Assembly FY27 Long Lead - Tail Pylon Assembly (†) (†) (†) FY27 Long Lead - Collective/Cyclic Inceptors (†) FY27 Long Lead - Landing Gear Assembly (Nose & Mains) (†) FY27 Long Lead - Rotary Wing Head Damper/Hub Assembly FY27 Long Lead - Main Rotor Servo (†) FY27 Long Lead - APU Engine Assembly (†) FY27 Long Lead - Hub Subassembly Forgings LI 0158 - CH-53K (Heavy Lift) Navy (Months) (Each) FY25 Long Lead - Rotary Wing Head Damper/Hub Assembly FY25 Long Lead - Main Rotor Servo Production Leadtime (†) (†) Unit Cost ($ K) Contract Forecast Date 2027 Qty (Each) For FY Total Cost Request ($ M) 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - UNCLASSIFIED Page 10 of 13 P-1 Line #7 Volume 1 - 94 === page 145 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Date: April 2026 P-5 Number / Title: 1 / CH-53K (Heavy Lift) FY 2027 QPA Cost Elements FY28 Long Lead - FWD Fuselage Structural Assembly FY28 Long Lead - Transition Structural Assembly (†) (†) FY28 Long Lead - Landing Gear Assembly (Nose & Mains) (†) FY28 Long Lead - Rotary Wing Head Damper/Hub Assembly FY28 Long Lead - Main Rotor Servo (†) (†) FY28 Long Lead - APU Engine Assembly (†) FY28 Long Lead - Hub Subassembly Forgings (†) FY28 Long Lead - Other General Procurements/Subassembly Parts ($ K) Contract Forecast Date 2027 Qty For FY (Each) 0 (†) (†) FY28 Long Lead - Collective/Cyclic Inceptors Unit Cost (Months) (Each) FY27 Long Lead - Other General Procurements/Subassembly Parts FY28 Long Lead - Tail Pylon Assembly Production Leadtime (17) Total Cost Request ($ M) - 0 31 7,133.267 Jan 2027 15 106.999 0 29 2,167.133 Jan 2027 15 32.507 0 33 1,149.800 Jan 2027 15 17.247 0 25 763.267 Jan 2027 15 11.449 0 28 707.200 Jan 2027 15 10.608 0 25 645.667 Jan 2027 15 9.685 0 22 569.200 Jan 2027 15 8.538 0 21 661.444 Jan 2027 9 5.953 0 28 329.467 Jan 2027 15 4.942 0 110.100 FY26 EOQ Airframe - Lot 10 0 - FY27 EOQ Airframe - Lot 11 0 - FY28 EOQ Airframe - Lot 12 0 - FY29 EOQ Airframe - Lot 13 0 - Total: CFE 318.028 GFE GFE - Miscellaneous FY23 Long Lead GFE - APR39D(V)2 Radar Target Data Processor FY23 Long Lead GFE - APR39D(V)2 Radar Receiver (†) (†) FY23 Long Lead GFE - DIRCM Guardian Laser Transmitter Asy (GLTA) FY23 Long Lead GFE - Advance Threat Warning Sensor (ATW) (†) (†) FY23 Long Lead GFE - LAIRCM System Processor Replacement (LSPR) FY23 Long Lead GFE - Other General Procurements/Subassembly Parts FY24 Long Lead GFE - APR39D(V)2 Radar Target Data Processor FY24 Long Lead GFE - APR39D(V)2 Radar Receiver LI 0158 - CH-53K (Heavy Lift) Navy (†) (†) (†) 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - 0 - UNCLASSIFIED Page 11 of 13 P-1 Line #7 Volume 1 - 95 === page 146 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Date: April 2026 P-5 Number / Title: 1 / CH-53K (Heavy Lift) FY 2027 Production Leadtime QPA Cost Elements (Months) (Each) (†) Unit Cost ($ K) Contract Forecast Date 2027 Qty (Each) For FY Total Cost Request ($ M) 0 - 0 - 0 - FY24 Long Lead GFE - Other General Procurements/Subassembly Parts 0 - FY25 Long Lead - T408 0 - 0 - 0 - 0 - 0 - 0 - FY25 Long Lead GFE - Other General Procurements/Subassembly Parts 0 - FY26 Long Lead - T408 0 - 0 - 0 - 0 - 0 - 0 - FY26 Long Lead GFE - Other General Procurements/Subassembly Parts 0 - FY27 Long Lead - T408 0 - 0 - 0 - 0 - 0 - FY24 Long Lead GFE - DIRCM Guardian Laser Transmitter Asy (GLTA) FY24 Long Lead GFE - Advance Threat Warning Sensor (ATW) (†) FY24 Long Lead GFE - LAIRCM System Processor Replacement (LSPR) FY25 Long Lead GFE - APR39D(V)2 Radar Target Data Processor FY25 Long Lead GFE - APR39D(V)2 Radar Receiver (†) (†) FY25 Long Lead GFE - DIRCM Guardian Laser Transmitter Asy (GLTA) FY25 Long Lead GFE - Advance Threat Warning Sensor (ATW) (†) (†) FY25 Long Lead GFE - LAIRCM System Processor Replacement (LSPR) FY26 Long Lead GFE - APR39D(V)2 Radar Target Data Processor FY26 Long Lead GFE - APR39D(V)2 Radar Receiver (†) (†) (†) FY26 Long Lead GFE - DIRCM Guardian Laser Transmitter Asy (GLTA) FY26 Long Lead GFE - Advance Threat Warning Sensor (ATW) (†) (†) FY26 Long Lead GFE - LAIRCM System Processor Replacement (LSPR) FY27 Long Lead GFE - APR39D(V)2 Radar Target Data Processor FY27 Long Lead GFE - APR39D(V)2 Radar Receiver (†) (†) (†) (†) FY27 Long Lead GFE - DIRCM Guardian Laser Transmitter Asy (GLTA) FY27 Long Lead GFE - Advance Threat Warning Sensor (ATW) (†) (†) (†) 0 - FY27 Long Lead GFE - Other General Procurements/Subassembly Parts 0 - LI 0158 - CH-53K (Heavy Lift) Navy UNCLASSIFIED FY27 Long Lead GFE - LAIRCM System Processor Replacement (LSPR) Page 12 of 13 P-1 Line #7 Volume 1 - 96 === page 147 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 0158 / CH-53K (Heavy Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Date: April 2026 P-5 Number / Title: 1 / CH-53K (Heavy Lift) FY 2027 QPA Cost Elements Unit Cost (Months) (Each) FY28 Long Lead - T408 ($ K) Contract Forecast Date 2027 Qty For FY (Each) Total Cost Request ($ M) 0 FY28 Long Lead GFE - APR39D(V)2 Radar Target Data Processor FY28 Long Lead GFE - APR39D(V)2 Radar Receiver Production Leadtime (†) (†) FY28 Long Lead GFE - DIRCM Guardian Laser Transmitter Asy (GLTA) (18) (†) FY28 Long Lead GFE - Advance Threat Warning Sensor (ATW) (†) FY28 Long Lead GFE - LAIRCM System Processor Replacement (LSPR) (19) (†) FY28 Long Lead GFE - Other General Procurements/Subassembly Parts (20) 56.116 0 18 598.579 Feb 2027 19 11.373 0 18 55.439 Feb 2027 57 3.160 18 400.658 Mar 2027 38 18 101.653 Mar 2027 95 18 295.684 Mar 2027 19 0 0 0 15.225 9.657 5.618 0 10.118 Total: GFE 111.267 Total Advance Procurement/Obligation Authority 429.295 Description: Advance Procurement funding will be used to procure long-lead materials and aircraft components with an extended production lead-time. These long-lead requirements are essential to establishing and maintaining a production schedule in support of the Marine Aviation Plan and Marine Air-Ground Task Force CH-53E replacement schedule. Procurement of long-lead items is determined based upon need dates for materials/components incorporation into the production line build sequence. CFE procurements include: various airframe components, forgings and castings, and raw materials (Titanium). GFE procurements include: various communication, navigation and survivability components. Distribution of funding between long-lead CFE and GFE elements continue to evolve as production lead-times change. Long-lead list is subject to change based on lead-time changes and pricing negotiations. (†) indicates the presence of Contract Data presented in the associated P-5 Item's P-5a exhibit. Footnotes: (17) (18) (19) (20) Other General Procurements: Multiple subassembly components with various lead-times in excess of 12 months. Directional Infrared Countermeasures (DIRCM) Large Aircraft Infrared Countermeasures (LAIRCM) Other General Procurements: Multiple subassembly components with various lead-times in excess of 12 months. LI 0158 - CH-53K (Heavy Lift) Navy UNCLASSIFIED Page 13 of 13 P-1 Line #7 Volume 1 - 97 === page 148 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 98 === page 149 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 0164 / V-22 (Medium Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat Aircraft ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 212 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 412 35,841.323 35,841.323 35,841.323 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 412 30.118 47.196 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 35,918.637 - - - - - - - - - - 30.118 47.196 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - - 30.118 47.196 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - Total 35,918.637 35,918.637 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Flyaway Unit Cost ($ in Thousands) Gross/Weapon System Unit Cost ($ in Thousands) 76,268.056 - 0.016 6.850 0.765 - 0.765 17.612 27.172 28.513 0.968 - - - - - - - - - 830.459 - - - - - - - - - - - 912.355 76,444.505 - Description: The V-22 is a tilt-rotor vertical takeoff and landing aircraft currently being produced for joint service application. The program provides an aircraft to meet the amphibious/vertical assault needs of the United States Marine Corps (USMC), the Carrier Onboard Delivery (COD) needs of the United States Navy (USN), and supplements United States Special Operations Command (USSOCOM) special mission aircraft. The aircraft is capable of flying 2,100 miles with one refueling, and gives the Services the advantage of a Vertical/Short Takeoff and Landing (V/STOL) aircraft that can rapidly self-deploy to any location in the world. The current procurement objective is 359 MV-22 USMC aircraft, 53 CMV-22 USN aircraft, and 56 CV-22 aircraft for USSOCOM (funded by USSOCOM and the United States Air Force). The MV-22 program successfully completed Milestone III in the 1st Quarter of 2006, and Initial Operational Capability (IOC) in March of 2007. The CMV-22 program successfully completed IOC December of 2021. The USMC Program of Record (POR) for MV-22 aircraft quantities is 359. The USN POR for CMV-22 aircraft quantities remains 48. FY24 authorized for five CMV-22 USN aircraft above the program of record. LI 0164 - V-22 (Medium Lift) Navy UNCLASSIFIED Page 1 of 17 P-1 Line #8 Volume 1 - 99 === page 150 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 0164 / V-22 (Medium Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat Aircraft ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 212 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / 0164 MV-22 P-5a, P-21 359 / 30,630.133 - / 30.118 - / 47.196 - / 0.000 - / 0.000 - / 0.000 P-5 2 / 0164 CMV-22 P-5a, P-21 53 / 5,211.190 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-40 Total Gross/Weapon System Cost 412 / 35,841.323 - / 30.118 - / 47.196 - / 0.000 - / 0.000 - / 0.000 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: There is no FY27 budget request. LI 0164 - V-22 (Medium Lift) Navy UNCLASSIFIED Page 2 of 17 P-1 Line #8 Volume 1 - 100 === page 151 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0164 / V-22 (Medium Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / 0164 MV-22 MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 30.118 47.196 0.000 0.000 0.000 359 Gross/Weapon System Cost ($ in Millions) 30,630.133 FY 2027 Total Less PY Advance Procurement ($ in Millions) 1,603.412 - - - - - Net Procurement (P-1) ($ in Millions) 30,630.133 30.118 47.196 0.000 0.000 0.000 Plus CY Advance Procurement ($ in Millions) 1,603.412 - - - - - Total Obligation Authority ($ in Millions) 30,630.133 30.118 47.196 0.000 0.000 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) 85,320.705 - - - - - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost (†) 1.1.1) Airframe/CFE 1.1.2) GFE Electronics 1.1.3) Engines/Eng Acc (†) 65,018.398 2,118.109 359 23,341.605 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - 325.406 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 718 1,520.802 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.4) Other GFE - - 70.923 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.5) Recurring Flyaway ECO - - 164.403 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 25,423.139 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.2.1) Non-Recurring Cost - - 873.315 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.2.2) Production Line Shutdown - - 18.095 - - 26.939 - - 45.758 - - 0.000 - - 0.000 - - 0.000 1.2.3) Ancillary Equipment - - 156.824 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.2.4) Other - - 293.844 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 1,342.078 - - 26.939 - - 45.758 - - 0.000 - - 0.000 - - 0.000 - - 26,765.217 - - 26.939 - - 45.758 - - 0.000 - - 0.000 - - 0.000 2.1) Airframe PGSE - - 476.717 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.2) Engine PGSE - - 40.679 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Non Recurring Cost Subtotal: Non Recurring Cost Subtotal: Flyaway Cost Support Cost LI 0164 - V-22 (Medium Lift) Navy UNCLASSIFIED Page 3 of 17 P-1 Line #8 Volume 1 - 101 === page 152 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0164 / V-22 (Medium Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / 0164 MV-22 MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) 2.3) Avionics PGSE - - 241.649 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.4) Pec Trng Eq - - 443.832 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.5) Pub/Tech Eq - - 114.073 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.6) Prod Eng Supt - - 1,265.799 - - 2.749 - - 1.000 - - 0.000 - - 0.000 - - 0.000 2.7) Other ILS - - 1,050.767 - - 0.430 - - 0.438 - - 0.000 - - 0.000 - - 0.000 2.8) Common SE - - 231.400 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Support Cost - - 3,864.916 - - 3.179 - - 1.438 - - 0.000 - - 0.000 - - 0.000 359 30,630.133 - - 30.118 - - 47.196 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost (†) 85,320.705 indicates the presence of a P-5a LI 0164 - V-22 (Medium Lift) Navy UNCLASSIFIED Page 4 of 17 P-1 Line #8 Volume 1 - 102 === page 153 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (†) 1.1.1) Airframe/CFE 1.1.3) Engines/Eng Acc (†) (†) O O C P-1 Line Item Number / Title: 0164 / V-22 (Medium Lift) Item Number / Title [DODIC]: 1 / 0164 MV-22 FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery 2022 Bell Boeing / Amarillo, TX SS / FPIF NAVAIR Dec 2021 Nov 2024 9 76,006.195 Y Mar 2016 2022 Allison Engine Co. (Rolls Royce) / Indianapolis, IN SS / FFP NAVAIR Jan 2022 Mar 2023 18 2,553.976 Y Apr 2016 Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($ K) RFP Issue Date indicates the presence of a P-21 LI 0164 - V-22 (Medium Lift) Navy UNCLASSIFIED Page 5 of 17 P-1 Line #8 Volume 1 - 103 === page 154 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0164 / V-22 (Medium Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / 0164 MV-22 Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) Airframe/CFE Prior Years Deliveries: 350 1 2022 NAVY 9 (1) 0 9 18 0 18 A - - - - - - - - - - - - - - - - - - - - - - 9 - 12 1.1.3) Engines/Eng Acc Prior Years Deliveries: 700 2 2022 NAVY A O C T LI 0164 - V-22 (Medium Lift) Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 17 S E P O C T N O V D E C J A N F E B P-1 Line #8 2 M A R A P R 2 M A Y J U N J U L 2 A U G S E P Volume 1 - 104 === page 155 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0164 / V-22 (Medium Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / 0164 MV-22 Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) Airframe/CFE Prior Years Deliveries: 350 1 2022 NAVY 9 (1) 0 9 18 6 12 - - - - - - - - - - - - - 2 2 1 - - - - - - - - 4 1.1.3) Engines/Eng Acc Prior Years Deliveries: 700 2 2022 NAVY 2 O C T LI 0164 - V-22 (Medium Lift) Navy N O V 2 D E C J A N 2 F E B M A R 2 A P R M A Y 2 J U N J U L 2 A U G UNCLASSIFIED Page 7 of 17 0 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 105 === page 156 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0164 / V-22 (Medium Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / 0164 MV-22 Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Fiscal Year 2027 Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.1.1) Airframe/CFE Prior Years Deliveries: 350 1 2022 NAVY 9 (1) 5 4 18 18 0 1 - - - - 1 - 1 - - - - 1 0 1.1.3) Engines/Eng Acc Prior Years Deliveries: 700 2 2022 NAVY 0 O C T LI 0164 - V-22 (Medium Lift) Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 17 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 106 === page 157 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0164 / V-22 (Medium Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Item Number / Title [DODIC]: 1 / 0164 MV-22 Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 6 10 44 19 3 24 27 0 2 24 26 88 9 3 14 17 3 3 14 17 1 Bell Boeing - Amarillo, TX 2 Allison Engine Co. (Rolls Royce) - Indianapolis, IN ALT After Oct 1 Reorder ALT Prior to Oct 1 Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (1) FY 2022 Congressional Add MV-22 aircraft procured will deliver with Lot 26. LI 0164 - V-22 (Medium Lift) Navy UNCLASSIFIED Page 9 of 17 P-1 Line #8 Volume 1 - 107 === page 158 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0164 / V-22 (Medium Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / 0164 CMV-22 MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 0.000 0.000 0.000 0.000 0.000 53 Gross/Weapon System Cost ($ in Millions) 5,211.190 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 95.801 - - - - - 5,211.190 0.000 0.000 0.000 0.000 0.000 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Total 95.801 - - - - - 5,211.190 0.000 0.000 0.000 0.000 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) 98,324.340 - - - - - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost (†) 1.1.1) Airframe/CFE 1.1.2) GFE Electronics 1.1.3) Engines/Eng Acc (†) 78,112.415 2,373.896 53 4,139.958 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - 98.515 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 106 251.633 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.4) Other GFE - - 17.370 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.5) Recurring Flyaway ECO - - 14.229 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 4,521.705 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.2.1) Non-Recurring Cost - - 119.083 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.2.3) Ancillary Equipment - - 16.434 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Non Recurring Cost - - 135.517 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 4,657.222 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1) Airframe PGSE - - 87.237 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.2) Engine PGSE - - 8.904 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.3) Avionics PGSE - - 11.523 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.4) Pec Trng Eq - - 74.942 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Non Recurring Cost Subtotal: Flyaway Cost Support Cost LI 0164 - V-22 (Medium Lift) Navy UNCLASSIFIED Page 10 of 17 P-1 Line #8 Volume 1 - 108 === page 159 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0164 / V-22 (Medium Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / 0164 CMV-22 MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) 2.5) Pub/Tech Eq - - 1.350 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.6) Prod Eng Supt - - 182.098 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.7) Other ILS - - 187.914 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Support Cost - - 553.968 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 53 5,211.190 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost (†) 98,324.340 indicates the presence of a P-5a LI 0164 - V-22 (Medium Lift) Navy UNCLASSIFIED Page 11 of 17 P-1 Line #8 Volume 1 - 109 === page 160 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 FY Contractor and Location (†) 2022 Bell Boeing / Amarillo, TX SS / FPIF NAVAIR Dec 2021 Oct 2025 3 77,092.702 Y Mar 2016 (†) 2023 Bell Boeing / Amarillo, TX SS / FPIF NAVAIR May 2023 Nov 2026 4 109,284.750 Y Mar 2016 (†) 2024 Bell Boeing / Amarillo, TX SS / FPIF NAVAIR Mar 2025 Mar 2027 5 106,200.000 Y Jun 2024 2022 Allison Engine Co. (Rolls Royce) / Indianapolis, IN SS / FFP NAVAIR Jan 2022 Mar 2023 6 2,553.976 Y Apr 2016 2023 Allison Engine Co. (Rolls Royce) / Indianapolis, IN SS / FFP NAVAIR May 2023 Jul 2024 8 2,684.228 Y Apr 2016 2024 Allison Engine Co. (Rolls Royce) / Indianapolis, IN SS / FFP NAVAIR Aug 2025 Oct 2026 10 3,500.000 Y Jun 2024 1.1.1) Airframe/CFE 1.1.1) Airframe/CFE 1.1.1) Airframe/CFE (†) Item Number / Title [DODIC]: 2 / 0164 CMV-22 Method/Type or Funding Vehicle Cost Elements 1.1.3) Engines/Eng Acc (†) 1.1.3) Engines/Eng Acc (†) 1.1.3) Engines/Eng Acc (†) O O C P-1 Line Item Number / Title: 0164 / V-22 (Medium Lift) Location of PCO Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($ K) RFP Issue Date indicates the presence of a P-21 LI 0164 - V-22 (Medium Lift) Navy UNCLASSIFIED Page 12 of 17 P-1 Line #8 Volume 1 - 110 === page 161 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0164 / V-22 (Medium Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 2 / 0164 CMV-22 Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) Airframe/CFE Prior Years Deliveries: 41 1 2022 NAVY 3 0 3 1 2023 NAVY 4 0 4 1 2024 NAVY 5 0 5 A - - - - - - - - - - - - - - - - - - - - - - 3 A - - - - - 4 5 1.1.3) Engines/Eng Acc Prior Years Deliveries: 82 2 2022 NAVY 6 0 6 2 2023 NAVY 8 0 8 2 2024 NAVY 10 0 10 A - - - - - - - - - - - - - 2 - - 2 A - - - - - - 2 0 - 8 10 O C T LI 0164 - V-22 (Medium Lift) Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 17 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 111 === page 162 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0164 / V-22 (Medium Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 2 / 0164 CMV-22 Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) Airframe/CFE Prior Years Deliveries: 41 1 2022 NAVY 3 0 3 - - - - - - - - - - - - - - - - - - - - - - - - 3 1 2023 NAVY 4 0 4 - - - - - - - - - - - - - - - - - - - - - - - - 4 1 2024 NAVY 5 0 5 A - - - - - - - 5 1.1.3) Engines/Eng Acc Prior Years Deliveries: 82 2 2022 NAVY 6 6 0 2 2023 NAVY 8 0 8 2 2024 NAVY 10 0 10 0 - - - - - - - - 2 2 - 2 2 0 A - O C T LI 0164 - V-22 (Medium Lift) Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 17 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G - 10 S E P Volume 1 - 112 === page 163 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0164 / V-22 (Medium Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 2 / 0164 CMV-22 Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) Airframe/CFE Prior Years Deliveries: 41 1 2022 NAVY 3 0 3 - - - - - - - - - 1 2023 NAVY 4 0 4 - 1 - - - - - - - - - - 1 - 1 - 0 1 2024 NAVY 5 0 5 - - - - - - - - - - - - - 1 2 - 1 - 0 - - 1 - 1 - 1 - 1 1 1.1.3) Engines/Eng Acc Prior Years Deliveries: 82 2 2022 NAVY 6 6 0 2 2023 NAVY 8 8 0 2 2024 NAVY 10 0 10 0 0 O C T LI 0164 - V-22 (Medium Lift) Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 17 S E P 2 O C T N O V 2 D E C J A N 2 F E B P-1 Line #8 M A R 2 A P R M A Y 2 J U N 0 J U L A U G S E P Volume 1 - 113 === page 164 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0164 / V-22 (Medium Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 2 / 0164 CMV-22 Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.1.1) Airframe/CFE Prior Years Deliveries: 41 1 2022 NAVY 3 3 0 1 2023 NAVY 4 4 0 1 2024 NAVY 5 4 1 0 0 - 1 0 1.1.3) Engines/Eng Acc Prior Years Deliveries: 82 2 2022 NAVY 6 6 0 0 2 2023 NAVY 8 8 0 0 2 2024 NAVY 10 10 0 0 O C T LI 0164 - V-22 (Medium Lift) Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 17 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 114 === page 165 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0164 / V-22 (Medium Lift) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Item Number / Title [DODIC]: 2 / 0164 CMV-22 Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 6 10 44 19 3 17 20 0 2 24 26 88 9 3 14 17 3 3 14 17 1 Bell Boeing - Amarillo, TX 2 Allison Engine Co. (Rolls Royce) - Indianapolis, IN ALT After Oct 1 Reorder ALT Prior to Oct 1 Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0164 - V-22 (Medium Lift) Navy UNCLASSIFIED Page 17 of 17 P-1 Line #8 Volume 1 - 115 === page 166 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 116 === page 167 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat Aircraft ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0178 / UH-1Y/AH-1Z Program Elements for Code B Items: N/A Other Related Program Elements: 0604245M Line Item MDAP/MAIS Code: 101 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 349 10,560.581 10,560.581 10,560.581 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 8.701 8.305 5.974 0.000 5.974 6.794 6.958 7.078 7.211 26.662 - - - - - - - - - - 8.701 8.305 5.974 0.000 5.974 6.794 6.958 7.078 7.211 26.662 - - - - - - - - - - 8.701 8.305 5.974 0.000 5.974 6.794 6.958 7.078 7.211 26.662 Total 349 10,638.264 10,638.264 10,638.264 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Flyaway Unit Cost ($ in Thousands) Gross/Weapon System Unit Cost ($ in Thousands) 26,018.837 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 26,241.424 - Description: The mission of the AH-1Z attack helicopter is to provide rotary wing close air support, anti-armor, armed escort, armed/visual reconnaissance, anti-helicopter and point air defense and fire support coordination during day/night conditions. UH-1Y utility helicopter also provides command and control and combat assault support during day/night and reduced weather conditions. The UH-1Y/AH-1Z procurement strategy is to convert 37 AH-1W helicopters into AH-1Zs (complete), build 152 new AH-1Zs, remanufacture ten (10) H-1N helicopters into UH-1Ys (complete), and build 150 new UH-1Y models. The UH-1Y and AH-1Z share an 85 percent common footprint, which includes portions of maintenance planning, technical data, supply support, support equipment, facilities, and resources required at the intermediate and depot level maintenance activities for both structural and avionics items of repair. The UH-1Y and AH-1Z include a new 4-bladed rotor system with semiautomatic blade fold of the new composite rotor blades, performance-matched transmissions, a new 4-bladed tail rotor and drive system, upgraded landing gear, and pylon structural modifications as compared to the legacy aircraft. Both aircraft also incorporate common, modernized, and fully integrated cockpits/avionics that will reduce operator work load and improve situational awareness and safety. The UH-1Y/AH-1Z aircraft have increased maneuverability, speed, and payload capability. Additionally, the AH-1Z upgrades the current AH-1W Night Targeting System (NTS) Forward Looking Infrared (FLIR) system to a 3rd generation, staring, focal plane array FLIR that significantly extends autonomous weapons engagement ranges. LI 0178 - UH-1Y/AH-1Z Navy UNCLASSIFIED Page 1 of 6 P-1 Line #9 Volume 1 - 117 === page 168 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 0178 / UH-1Y/AH-1Z Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat Aircraft ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0604245M Line Item MDAP/MAIS Code: 101 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 1 / UH-1Y 160 / 4,260.200 - / 0.000 - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-5 2 / AH-1Z 189 / 6,300.381 - / 8.701 - / 8.305 - / 5.974 - / 0.000 - / 5.974 P-40 Total Gross/Weapon System Cost 349 / 10,560.581 - / 8.701 - / 8.305 - / 5.974 - / 0.000 - / 5.974 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY2027 budget request continues Production Line Shutdown costs associated with Aircraft Contractor Furnished Equipment (CFE), Government Furnished Equipment/Government Furnished Property (GFE/ GFP) which includes planning and administration of the physical disposition of tools and equipment, data transition, supplier close-out, government and contractor labor, tech data procurements, and storage requirements. The final domestic aircraft was delivered in September 2022. Production Line Shutdown and Acquisition Closure requirements continue into FY31, following the last planned delivery of FMS aircrafts. LI 0178 - UH-1Y/AH-1Z Navy UNCLASSIFIED Page 2 of 6 P-1 Line #9 Volume 1 - 118 === page 169 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0178 / UH-1Y/AH-1Z Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / UH-1Y MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 0.000 0.000 0.000 0.000 0.000 160 Gross/Weapon System Cost ($ in Millions) 4,260.200 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 4,260.200 Plus CY Advance Procurement ($ in Millions) - - - - - 0.000 0.000 0.000 0.000 0.000 - Total Obligation Authority ($ in Millions) 4,260.200 FY 2027 Total - - - - - 0.000 0.000 0.000 0.000 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) 26,626.250 - - - - - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost 1.1.1) Airframe/CFE 18,086.725 1.1.2) GFE Electronics - 1.1.3) Engines/Eng Acc (new) 553.597 1.1.4) Engines/Eng Acc (refurb) 386.472 160 2,893.876 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - 314.204 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 248 137.292 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 72 27.826 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.5) Armament - - 1.526 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.6) Other GFE - - 46.235 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.7) ECO - - 65.878 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 3,486.837 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.2.1) Non-Recur Cost - - 125.857 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.2.2) Ancillary Equip - - 14.815 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Non Recurring Cost - - 140.672 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 3,627.509 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.1) Airframe PGSE - - 169.314 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.2) Pec trng Eq - - 117.373 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.3) Pub/Tech Eq - - 86.087 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.4) Prod Eng Supt - - 136.620 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost Non Recurring Cost Subtotal: Flyaway Cost Support Cost LI 0178 - UH-1Y/AH-1Z Navy UNCLASSIFIED Page 3 of 6 P-1 Line #9 Volume 1 - 119 === page 170 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0178 / UH-1Y/AH-1Z Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / UH-1Y MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) 2.5) Other ILS - - 120.304 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.6) Reclamation - - 2.993 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Support Cost - - 632.691 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 160 4,260.200 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Gross/Weapon System Cost 26,626.250 LI 0178 - UH-1Y/AH-1Z Navy UNCLASSIFIED Page 4 of 6 P-1 Line #9 Volume 1 - 120 === page 171 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0178 / UH-1Y/AH-1Z Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / AH-1Z MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 8.701 8.305 5.974 0.000 5.974 189 Gross/Weapon System Cost ($ in Millions) 6,300.381 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 6,300.381 Plus CY Advance Procurement ($ in Millions) - - - - - 8.701 8.305 5.974 0.000 5.974 - Total Obligation Authority ($ in Millions) 6,300.381 FY 2027 Total - - - - - 8.701 8.305 5.974 0.000 5.974 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) 33,335.349 - - - - - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost 1.1.1) Airframe/CFE (1) 20,167.471 1.1.2) GFE Electronics - 189 3,811.652 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - 867.454 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.3) Engines/Eng Acc (new) 782.715 274 214.464 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.4) Engines/Eng Acc (refurb) 313.846 104 32.640 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.5) Armament - - 83.660 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.6) Other GFE - - 49.623 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.7) Rec Flyaway ECO - - 72.027 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Recurring Cost - - 5,131.520 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.2.1) Non-Recur Cost - - 130.281 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.2.2) Production Line Shutdown - - 4.275 - - 8.701 - - 8.305 - - 5.974 - - 0.000 - - 5.974 1.2.3) Ancillary Equip - - 186.989 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Non Recurring Cost - - 321.545 - - 8.701 - - 8.305 - - 5.974 - - 0.000 - - 5.974 - - 5,453.065 - - 8.701 - - 8.305 - - 5.974 - - 0.000 - - 5.974 - - 186.048 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Non Recurring Cost Subtotal: Flyaway Cost Support Cost 2.1) Airframe PGSE LI 0178 - UH-1Y/AH-1Z Navy UNCLASSIFIED Page 5 of 6 P-1 Line #9 Volume 1 - 121 === page 172 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0178 / UH-1Y/AH-1Z Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 2 / AH-1Z MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) ($ M) 2.2) Pec Trng Eq - - 139.381 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.3) Pub/Tech Eq - - 97.796 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.4) Prod Eng Supt - - 232.772 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.5) Other ILS - - 168.326 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.6) Reclamation - - 2.993 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 2.7) Other Support - - 20.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 Subtotal: Support Cost - - 847.316 - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - 0.000 189 6,300.381 - - 8.701 - - 8.305 - - 5.974 - - 0.000 - - 5.974 Gross/Weapon System Cost 33,335.349 Footnotes: (1) Production Line Shutdown costs associated with Aircraft Contractor Furnished Equipment (CFE), Government Furnished Equipment/Government Furnished Property (GFE/GFP) which includes planning and administration of the physical disposition of tools and equipment, data transition, supplier close-out, government and contractor labor, tech data procurements, and storage requirements. Production Line Shutdown and Acquisition Closure requirements continue into FY31, following the last planned delivery of FMS aircrafts. LI 0178 - UH-1Y/AH-1Z Navy UNCLASSIFIED Page 6 of 6 P-1 Line #9 Volume 1 - 122 === page 173 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 0193 / P-8A Poseidon Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat Aircraft ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: 0605500N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 334 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 138 27,620.230 27,620.230 27,620.230 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - 12 - 12 - - - - - 150 12.424 13.631 23.287 23.985 24.704 25.444 - 31,971.055 - - 12.424 13.631 - - 12.424 13.631 4,227.350 - 0.000 4,227.350 - 4,227.350 - 0.000 4,227.350 - 4,227.350 0.000 4,227.350 To FY 2031 Complete - - - - - 23.287 23.985 24.704 25.444 - - - - - - 23.287 23.985 24.704 25.444 - Total 31,971.055 31,971.055 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 54.835 94.763 - 94.763 26.032 - - - - 175.630 Flyaway Unit Cost ($ in Thousands) 172,147.333 - - - 328,478.167 - 328,478.167 - - - - - 184,653.800 Gross/Weapon System Unit Cost ($ in Thousands) 200,146.594 - - 352,279.167 - 352,279.167 - - - - - 213,140.367 Description: The P-8A Multi-mission Maritime Aircraft (MMA) system is a heavily modified and militarized derivative of Boeing's 737-800 ERX commercial aircraft. P-8A is Department of War's (DoW's) only long-range full-spectrum Anti-Submarine Warfare (ASW), cue-to-kill platform, with substantial armed Anti-Surface Warfare (ASuW) and networked Intelligence, Surveillance, and Reconnaissance (ISR) capabilities. The procurement funds the production of the aircraft, training systems, and associated support equipment in response to the DoW's requirement to field and sustain P-8A capabilities and readiness necessary for a wartime tempo. LI 0193 - P-8A Poseidon Navy UNCLASSIFIED Page 1 of 13 P-1 Line #10 Volume 1 - 123 === page 174 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 0193 / P-8A Poseidon Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat Aircraft ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: 0605500N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 334 Exhibits Schedule Exhibit Type Title* P-5 1 / P-8A MULTI-MISSION MARITIME AIRCRAFT (MMA) P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 138 / 27,620.230 - / 12.424 - / 13.631 12 / 4,227.350 - / 0.000 12 / 4,227.350 138 / 27,620.230 - / 12.424 - / 13.631 12 / 4,227.350 - / 0.000 12 / 4,227.350 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY2027 procurement funds are required for 12 Full Rate Production aircraft with associated equipment and support in response to the Department of War's requirement to field and sustain P-8A capabilities and readiness necessary for a wartime tempo. FY2027 unit cost increased due to two year gap in US Navy production buys (FY24 was the last procurement year), sustained global commercial economic price escalation, non-recurring engineering (NRE) redesigns to address pervasive commercial electronics component obsolescence, and incorporation of Increment 3 Block 2 (I3B2) engineering change proposals (ECP 6/7) into the production line as approved engineering change orders (ECO) in order to update the aircraft combat systems configuration in accordance with the approved evolutionary acquisition strategy. The capabilities provided by the I3B2 system are ASW, Wide Band SATCOM, Higher Than Secret (HTS) processing, Enhanced track management (Minotaur), Applications Based Architecture (ABA) and Combat System. FY2027 is the last planned year of production. Final aircraft delivery is planned for 1QFY32. LI 0193 - P-8A Poseidon Navy UNCLASSIFIED Page 2 of 13 P-1 Line #10 Volume 1 - 124 === page 175 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0193 / P-8A Poseidon Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / P-8A MULTI-MISSION MARITIME AIRCRAFT (MMA) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 138 Gross/Weapon System Cost ($ in Millions) 27,620.230 Less PY Advance Procurement ($ in Millions) - 12.424 13.631 - Net Procurement (P-1) ($ in Millions) 27,620.230 Plus CY Advance Procurement ($ in Millions) - - 12.424 13.631 - Total Obligation Authority ($ in Millions) 27,620.230 FY 2027 Base - - - 12.424 13.631 FY 2027 OOC 12 FY 2027 Total - 4,227.350 12 0.000 - 4,227.350 - 4,227.350 - 0.000 - 4,227.350 - - 4,227.350 0.000 4,227.350 94.763 - 94.763 352,279.167 - 352,279.167 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) 200,146.594 - 54.835 - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost (†) 1.1.1) Airframe/CFE 138 17,340.266 - - - - - - - - 3,622.264 - - - - - - (3) - - 1,439.871 - - - - - 1.1.4) Other GFE - - 1.521 - - - - - - 602.208 - - - - - - 23,006.130 - - - - - 213.571 - - - - 536.631 - - - 750.202 - - 23,756.332 - - 304.804 (1) 125,654.101 1.1.2) CFE Electronics (2) 1.1.3) GFE Electronics 1.1.5) Rec Flyaway ECO (4) Subtotal: Recurring Cost 172,407.470 12 2,068.890 - - - - - 469.511 - - - - - - 260.463 - - - - - - - - - - - 541.041 12 2,068.890 - - 469.511 - - - 260.463 - - - - - - - - - 541.041 - - - - - 3,339.905 - - - - - 3,339.905 - - - - - - 51.041 - - - - - 51.041 - - - - - - - 550.792 - - - - - 550.792 - - - - - - - - - - - - - - - 601.833 - - - - - 601.833 - 3,941.738 - - - - - 3,941.738 - - - - - 0.400 - - 0.440 - - - - - 0.440 - 172,407.470 - Non Recurring Cost 1.2.1) Ancillary Equip (5) 1.2.2) Non-Recur Cost (6) Subtotal: Non Recurring Cost Subtotal: Flyaway Cost Support Cost 2.1) Airframe PGSE (7) LI 0193 - P-8A Poseidon Navy UNCLASSIFIED Page 3 of 13 P-1 Line #10 Volume 1 - 125 === page 176 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0193 / P-8A Poseidon Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / P-8A MULTI-MISSION MARITIME AIRCRAFT (MMA) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) 2.2) Engine PGSE (Each) ($ M) Unit Cost ($ K) Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - 16.578 - - - - - - - - - - - - - - - - - 876.246 - - - - - - - - 15.012 - - - - - 15.012 (9) - - 1,531.681 - - - - - - - - 200.053 - - - - - 200.053 (10) - - 325.973 - - - - - - - - 8.559 - - - - - 8.559 - - 361.958 - - 12.424 - - 13.231 - - 35.764 - - - - - 35.764 - - 446.658 - - - - - - - - 25.784 - - - - - 25.784 - - 3,863.898 - - 12.424 - - 13.631 - - 285.612 - - - - - 285.612 138 27,620.230 - - 12.424 - - 13.631 352,279.167 12 4,227.350 - - 12 4,227.350 2.5) Pub/Tech Eq 2.6) Prod Eng Supt 2.7) Other ILS Qty FY 2026 Total Cost - 2.3) Avionics PGSE 2.4) Pec Trng Eq FY 2025 Total Cost (8) (11) (12) Subtotal: Support Cost Gross/Weapon System Cost 200,146.594 0.000 352,279.167 Remarks: NOTES: Totals may not add due to rounding. (†) indicates the presence of a P-5a Footnotes: (1) FY2027 unit cost increased due to two year gap in US Navy production buys (FY24 was the last procurement year), prolonged higher global commercial economic price escalation, non-recurring engineering (NRE) redesigns to address pervasive commercial electronics component obsolescence, and a diminished P-8A industrial based resulting from Boeing's 737 production line transition to support the commercial MAX variant. (2) FY2027 unit cost increased due to two year gap in US Navy production buys (FY24 was the last procurement year), prolonged higher global commercial economic price escalation, non-recurring engineering (NRE) redesigns to address pervasive commercial electronics component obsolescence, a diminished P-8A industrial based resulting from Boeing's 737 production line transition to support the commercial MAX variant. (3) FY2027 GFE Electronics unit cost increased due to two year gap in US Navy production buys (FY24 was the last procurement year), prolonged higher global commercial economic price escalation, nonrecurring engineering (NRE) redesigns to address pervasive commercial electronics component obsolescence (e.g., Identify Friend-or-Foe Interrogator and Transponder (IFF-I / IFF-T), High Frequency (HF) radios, MIDS JTRS COMSEC, INMARSAT, APY-10 Radar, and TACLANE). (4) (5) FY2027 Rec Flyaway ECO cost is to incorporate Increment 3 Block 2 (I3B2) ECP-6/7 and other approved engineering change orders (ECO) in the Lot 14 production configuration. FY2027 Ancillary Equipment includes Fleet critical Advanced Survivability Pod (ASP) and Advanced Airborne Sensor (AAS) installation A-kits and deployment mechanisms. Quantities are independent from aircraft procurement quantities and are based on Fleet operational requirements. Total procurement of up to 7 ASP shipsets and up to 7 AASs A-kits/mechanisms are planned. (6) FY2027 Non-recurring Engineering (NRE) is required to address pervasive commercial electronics component obsolescence across the platform via redesign, integration, and test activities. Known obsolescence includes critical safety, airworthiness and mission capabilities, including the P-8A Flight Management Computing System (FMCS), Stores Management System (SMS), Electronic Support Measures (ESM) system, Mission Computing Display System (MCDS), acoustics warfare system, and internal aircraft and avionics systems. (7) FY2027 Airframe Peculiar Ground Support Equipment (PGSE) funds are required to procure P-8A support equipment to support fielding of the additional aircraft. Airframe PGSE requirements are derived by establishment of Depot repair capability for GFE and the I3B2 configuration and are critical to sustaining the P-8A fleet and contributes to the availability of combat ready I3B2 configured aircraft. LI 0193 - P-8A Poseidon Navy UNCLASSIFIED Page 4 of 13 P-1 Line #10 Volume 1 - 126 === page 177 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 P-1 Line Item Number / Title: 0193 / P-8A Poseidon ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / P-8A MULTI-MISSION MARITIME AIRCRAFT (MMA) MDAP/MAIS Code: (8) FY2027 Avionics (PGSE) funds are required to procure P-8A support equipment to support fielding of the additional aircraft. Avionics PGSE requirements are derived by establishment of Depot repair capability for GFE and the I3B2 configuration and are critical to sustaining the P-8A fleet and contributes to the availability of combat ready I3B2 configured aircraft. (9) FY2027 Peculiar Training equipment (PTE) funds are required to procure hardware and software upgrades to previously fielded Fleet operational flight and weapons systems trainers, electronic classrooms, courseware, and I3B2 capabilities being delivered on the production aircraft. FY27 includes upgrades to Anti-Submarine and Surface Warfare (ASW/ASuW) targeting, electronic warfare coordination, communications, and weapons. (10) FY2027 Publications / Tech Data funds are required to procure Product Support Packages, including drawings, procedures, and technical manuals, capturing production aircraft I3B2 configuration to support Organizational (O), Intermediate (I) and Depot (D) level repair capabilities. (11) (12) FY2027 Production Engineering Support funds are required to support the acquisition and manufacturing support of the aircraft being procured. FY2027 Other ILS funds are required to support P-8A I3B2 configuration Intermediate and Depot Capability establishment, which includes Component Pilot Repair events at I/D facilities, validation and verification of procedures, and publishing of final products up to declaration of capability being established for each particular component. LI 0193 - P-8A Poseidon Navy UNCLASSIFIED Page 5 of 13 P-1 Line #10 Volume 1 - 127 === page 178 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 FY Contractor and Location (†) 2021 The Boeing Company / Seattle, WA SS / FPIF NAVAIR Apr 2021 Jun 2026 9 132,887.097 Y Nov 2018 (†) 2024 The Boeing Company / Seattle, WA SS / FPIF NAVAIR Dec 2024 Jun 2029 10 137,864.718 Y May 2024 (†) 2027 The Boeing Company / Seattle, WA C / FPIF NAVAIR Jan 2027 Jan 2031 12 172,407.470 Y Jul 2026 1.1.1) Airframe/CFE 1.1.1) Airframe/CFE 1.1.1) Airframe/CFE (†) Item Number / Title [DODIC]: 1 / P-8A MULTI-MISSION MARITIME AIRCRAFT (MMA) Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 0193 / P-8A Poseidon Location of PCO Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($ K) RFP Issue Date indicates the presence of a P-21 LI 0193 - P-8A Poseidon Navy UNCLASSIFIED Page 6 of 13 P-1 Line #10 Volume 1 - 128 === page 179 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0193 / P-8A Poseidon Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / P-8A MULTI-MISSION MARITIME AIRCRAFT (MMA) Fiscal Year 2021 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT Calendar Year 2021 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2022 M A Y J U N J U L Calendar Year 2022 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 119 1 2021 NAVY 9 (13) 0 9 1 2024 NAVY 10 (14) 0 10 1 2027 NAVY 12 0 12 A - - - - - - - - - - - - - - - - - 9 10 12 O C T LI 0193 - P-8A Poseidon Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 129 === page 180 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0193 / P-8A Poseidon Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / P-8A MULTI-MISSION MARITIME AIRCRAFT (MMA) Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 119 1 2021 NAVY 9 (13) 0 9 1 2024 NAVY 10 (14) 0 10 1 2027 NAVY 12 0 12 - - - - - - - - - - - - - - - - - - - - - - - 9 10 12 O C T LI 0193 - P-8A Poseidon Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 130 === page 181 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0193 / P-8A Poseidon Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / P-8A MULTI-MISSION MARITIME AIRCRAFT (MMA) Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 119 1 2021 NAVY 9 (13) 0 9 1 2024 NAVY 10 (14) 0 10 1 2027 NAVY 12 0 12 - - - - - - - - - - - - - - - - - - - A - - - - - - - - - - - - - - - - - - 1 1 - - - - 7 - - 10 12 O C T LI 0193 - P-8A Poseidon Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 131 === page 182 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0193 / P-8A Poseidon Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / P-8A MULTI-MISSION MARITIME AIRCRAFT (MMA) Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 119 1 2021 NAVY 9 (13) 2 7 1 2024 NAVY 10 (14) 0 10 1 2027 NAVY 12 0 12 1 - - - - - - - - - - A O C T LI 0193 - P-8A Poseidon Navy - N O V D E C J A N F E B 1 M A R - A P R 1 - - M A Y J U N - - - - J U L 1 - A U G UNCLASSIFIED Page 10 of 13 S E P - - - - - - - - - - - - - - O C T N O V D E C J A N F E B P-1 Line #10 M A R 3 A P R 0 - - M A Y - J U N - J U L A U G - 10 - 12 S E P Volume 1 - 132 === page 183 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0193 / P-8A Poseidon Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / P-8A MULTI-MISSION MARITIME AIRCRAFT (MMA) Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 119 1 2021 NAVY 9 (13) 9 0 1 2024 NAVY 10 (14) 0 10 - - - - - - - - 1 2027 NAVY 12 0 12 - - - - - - - - 0 O C T LI 0193 - P-8A Poseidon Navy N O V D E C J A N F E B M A R A P R M A Y 1 1 J U N - J U L 1 A U G UNCLASSIFIED Page 11 of 13 S E P O C T - - - - - - - - N O V D E C J A N 1 F E B P-1 Line #10 M A R - - - - - - - 6 - - - - - - - 12 A P R M A Y J U N J U L A U G S E P Volume 1 - 133 === page 184 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0193 / P-8A Poseidon Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / P-8A MULTI-MISSION MARITIME AIRCRAFT (MMA) Fiscal Year 2031 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2030 1 OCT Fiscal Year 2032 Calendar Year 2031 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2032 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 119 1 2021 NAVY 9 (13) 9 0 1 2024 NAVY 10 (14) 4 6 1 2027 NAVY 12 0 12 0 1 O C T LI 0193 - P-8A Poseidon Navy N O V - - - D E C - 1 J A N 1 1 F E B - 1 M A R 4 1 A P R 0 1 M A Y 1 J U N 1 J U L 1 A U G UNCLASSIFIED Page 12 of 13 1 S E P 1 O C T 1 N O V 1 D E C 0 J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 134 === page 185 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0193 / P-8A Poseidon Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Item Number / Title [DODIC]: 1 / P-8A MULTI-MISSION MARITIME AIRCRAFT (MMA) Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 The Boeing Company Seattle, WA MSR For 2027 1-8-5 For 2027 MAX For 2027 6 12 12 ALT Prior to Oct 1 ALT After Oct 1 9 Reorder Manufacturing PLT 7 34 Total After Oct 1 ALT Prior to Oct 1 41 ALT After Oct 1 3 Manufacturing PLT 3 Total After Oct 1 48 51 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (13) Final delivery of 3 aircraft shown in April 2026 due to the P-21 delivery schedule only going out 24 months. All aircraft will be delivered by April 2027. FY2021 delivery schedules have been adjusted to reflect Boeing's performance delays associated with resolution of commercial 737 quality issues, COVID, and Boeing decision to reduce the P-8A production build rate from 18 to 12 aircraft per year. (14) Final delivery of 4 aircraft shown in April 2029 due to the P-21 delivery schedule only going out 24 months. Only one of the four aircraft will deliver April 2029. Gap in USN deliveries caused by P-8A FMS orders for Germany and Canada that were placed prior to the PB24 enactment and P-8A production max build rate of 12 aircraft per year. LI 0193 - P-8A Poseidon Navy UNCLASSIFIED Page 13 of 13 P-1 Line #10 Volume 1 - 135 === page 186 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 136 === page 187 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 0195 / E-2D AHE Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat Aircraft ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 121 19,331.773 19,331.773 19,331.773 95.219 95.219 95.219 FY 2027 Base FY 2026 FY 2027 OOC 3 6 1,100.800 2,075.025 1,100.800 1,100.800 - FY 2027 Total 0.000 0.000 FY 2029 FY 2030 6 2 4 2,075.025 825.025 1,300.026 - 2,075.025 FY 2028 - To FY 2031 Complete Total - - - 136 0.026 0.026 - 24,727.920 300.000 600.000 - - - 900.000 2,075.025 525.025 700.026 0.026 0.026 - 23,827.920 550.000 - 550.000 350.000 2,625.025 0.000 2,625.025 875.025 700.026 - - - 900.000 0.026 0.026 - 24,727.920 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.006 0.030 - 0.030 - - - 0.036 Flyaway Unit Cost ($ in Thousands) 135,942.322 - - 350,426.667 336,012.667 - 336,012.667 382,387.000 - 309,615.000 - - - - 158,302.206 Gross/Weapon System Unit Cost ($ in Thousands) 159,766.719 - 366,933.333 345,837.500 - 345,837.500 412,512.500 325,006.500 - - - 181,822.941 Description: The E-2D Advanced Hawkeye (AHE) is an all-weather, twin engine, carrier-based, Airborne Command, Control and Surveillance aircraft designed to extend task force defense perimeters. The AHE mission is to provide advance warning of approaching enemy surface units and aircraft, to vector interceptors or strike aircraft to attack, and to provide area surveillance, intercept, search and rescue, communications relay, and strike/air traffic control. Key AHE objectives include improved battle space target detection and situational awareness, especially in the littorals; support of Theater Air Missile Defense operations; and improved Operational Availability. 0195 BLI Prior Year includes E-2C Procurement (Qty 44) 0195 BLI procurement quantity (qty) baseline for E-2D was increased by 11 from 75 to 86 per the R3B memo dated 19 July 2019. It identified the requirement for 11 additional E-2D aircraft that are necessary to fill fleet aircraft shortfalls due to insufficient pipeline and scheduled aircraft modifications. As of FY 2026 the program has been funded for 85 E-2D's. The FY27 budget funds the procurement of 12 additional E-2Ds (6 in FY27, 2 in FY28 and 4 in FY29) to replenish accelerated service life burn down of existing force structure due to Overland Airborne Early Warning (AEW) tasking. It also includes Advanced Procurement (AP) funding in FY27 and FY28 to support the FY28 and FY29 procurements. LI 0195 - E-2D AHE Navy UNCLASSIFIED Page 1 of 13 P-1 Line #11 Volume 1 - 137 === page 188 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 0195 / E-2D AHE Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat Aircraft ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 Exhibits Schedule Exhibit Type Title* P-5 1 / E-2D P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 121 / 19,331.773 - / 95.219 3 / 1,100.800 6 / 2,075.025 - / 0.000 6 / 2,075.025 121 / 19,331.773 - / 95.219 3 / 1,100.800 6 / 2,075.025 - / 0.000 6 / 2,075.025 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY27 budget includes funding to support additional aircraft procurement in FY27, FY28 and FY29 for a total of 12 additional aircraft across the FYDP. It also includes Advanced Procurement (AP) funding for the aircraft in FY28 and FY29. The FY27 request also includes remaining requirements to establish E-2D Organic Depot capability in accordance with Title 10 U.S. Code 2464 and government engineering and logistics support required to oversee aircraft production still underway. The three aircraft in FY 2026 fund the program to 85 E-2D's and aligns with the 19 July 2019 R3B Memo and will be procured on a separate contract at single year pricing and designated as FRP 12. LI 0195 - E-2D AHE Navy UNCLASSIFIED Page 2 of 13 P-1 Line #11 Volume 1 - 138 === page 189 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0195 / E-2D AHE Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / E-2D MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 121 Gross/Weapon System Cost ($ in Millions) 19,331.773 Less PY Advance Procurement ($ in Millions) 95.219 - Net Procurement (P-1) ($ in Millions) - Total Obligation Authority ($ in Millions) 6 1,100.800 2,075.025 - 95.219 1,100.800 6 0.000 2,075.025 - 2,075.025 - 95.219 FY 2027 Total - - 1,100.800 - 19,331.773 FY 2027 OOC 3 0.000 19,331.773 Plus CY Advance Procurement ($ in Millions) FY 2027 Base - - 0.000 2,075.025 550.000 - 550.000 2,625.025 0.000 2,625.025 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) 159,766.719 - 0.006 0.030 - 0.030 - 366,933.333 345,837.500 - 345,837.500 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost (†) 1.1.1) Airframe/CFE 1.1.2) Airframe/CFE (†) (Congressional Add) 1.1.3) CFE (†) Electronics 1.1.4) CFE Electronics (†) (Congressional Add) 1.1.5) GFE Electronics (1) 1.1.6) Engine/ Engine Accessories 1.1.7) Other GFE (2) 1.1.8) Recurring Flyaway ECO Subtotal: Recurring Cost 72,048.179 117 8,429.637 - - - 83,630.000 4 334.520 - - - 42,774.598 117 5,004.628 - - - 95,720.000 4 382.880 - - - 4,899.124 121 592.794 - - - - 251.428 - - - 1,299.124 121 157.194 - - - 3,780.000 3 11.340 3,858.500 11,846.931 29 343.561 - - - 5,899.200 3 17.698 5,613.900 - - 15,496.642 - - - - - 902.575 - - - 952.379 - - - - - 148.705 - - - - 9.489 - - - 168,962.200 - 3 - 104,996.700 - 3 314.990 - 17,220.000 - 506.887 159,734.400 3 51.660 - - - - - - - - - - - - - - - - - - - - - 6 23.151 - - - 3,858.500 6 23.151 6 33.683 - - - 5,613.900 6 33.683 - 1,717.833 - - - - - 1,717.833 - - 298.243 - - - - - 298.243 - - - - - - - - 6 - 99,521.000 - - 6 - 17,577.800 958.406 597.126 - 6 - 105.467 159,734.400 - 6 - 99,521.000 - - 6 - 17,577.800 958.406 597.126 - 6 - 105.467 - Non Recurring Cost 1.2.1) Non-Recurring Cost (3) 1.2.2) Production Line Shutdown (4) LI 0195 - E-2D AHE Navy - - UNCLASSIFIED Page 3 of 13 - P-1 Line #11 - Volume 1 - 139 === page 190 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0195 / E-2D AHE Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / E-2D MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) Subtotal: Non Recurring Cost FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - 952.379 - - 9.489 - - 148.705 - - 298.243 - - - - - 298.243 - - 16,449.021 - - 9.489 - - 1,051.280 - - 2,016.076 - - - - - 2,016.076 2.1) Airframe PGSE - - 66.851 - - - - - - - - - - - - - - - 2.2) Engine PGSE - - 67.935 - - - - - - - - - - - - - - - 2.3) Avionics PGSE - - 810.698 - - 6.739 - - - - - - - - - - - - 2.4) Peculiar Training Equipment - - 578.283 - - - - - - - - - - - - - - - (5) - - 162.407 - - - - - - - - 8.315 - - - - - 8.315 - - 649.719 - - 12.721 - - 29.521 - - 30.134 - - - - - 30.134 - - 546.859 - - 4.270 - - 19.999 - - 20.500 - - - - - 20.500 - - - - 62.000 - - - - - - - - - - - - - - 49.520 - - 58.949 - - - - - 2,075.025 - - Subtotal: Flyaway Cost Support Cost 2.5) Pub/Tech Eq 2.6) Production Engineering Support 2.7) Other ILS (6) (7) 2.8) Congressional Recission Enacted (8) - Subtotal: Support Cost Gross/Weapon System Cost (†) 159,766.719 - - 2,882.752 - - 85.730 121 19,331.773 - - 95.219 366,933.333 3 1,100.800 345,837.500 6 0.000 345,837.500 58.949 6 2,075.025 indicates the presence of a P-5a Footnotes: (1) Increase from FY26 to FY27 are currently driven by a number of GFE items requiring obsolescence redesigns, Non-Recurring Engineering (NRE), supplier requalification, and first article inspections which weren't required during our prior year multi year procurements. This is due to the realized gap in the supply base from not having aircraft in FY25. The costs correlate to the quantity of aircraft in each year. (2) Increase from FY26 to FY27 are currently driven by a number of GFE items requiring obsolescence redesigns, Non-Recurring Engineering (NRE), supplier requalification, and first article inspections which weren't required during our prior year multi year procurements. This is due to the realized gap in the supply base from not having aircraft in FY25. The costs correlate to the quantity of aircraft in each year. (3) Increase from FY26 to FY27 are currently driven by a number of GFE items requiring obsolescence redesigns, Non-Recurring Engineering (NRE), supplier requalification, and first article inspections which weren't required during our prior year multi year procurements. This is due to the realized gap in the supply base from not having aircraft in FY25. The costs correlate to the quantity of aircraft in each year. The unit cost increase is due to the entire radar system becoming obsolete. This NRE bill will be extensive, driving a new redesign and extensive regression flight test for qualification. (4) Initially there were no aircraft beyond FY24 and the program was moving towards production line shutdown. The FY25 funds were used to support a tooling reverification. Now that there are aircraft in the FYDP there are no longer costs planned for production line shutdown at this time. (5) (6) (7) The FY27 funds Pub/Tech Eq costs that correlate to the additional aircraft added in FY27 and out and cover the costs of items not included in the Block II configuration. FY27 Production Engineering Support funds government production-related engineering and support for delivery of aircraft in FY27. FY27 Integrated Logistics Support funds government production-related logistics and support for the delivery of aircraft through FY27. LI 0195 - E-2D AHE Navy UNCLASSIFIED Page 4 of 13 P-1 Line #11 Volume 1 - 140 === page 191 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 P-1 Line Item Number / Title: 0195 / E-2D AHE ID Code (A=Service Ready, B=Not Service Ready) : (8) Item Number / Title [DODIC]: 1 / E-2D MDAP/MAIS Code: Cost Element 2.8: Congressional Recission Enacted captures recission to FY 2025 ($62M) to E-2D AHE due to the availability of prior year funds and no aircraft procurements in FY 2025 or the FYDP. LI 0195 - E-2D AHE Navy UNCLASSIFIED Page 5 of 13 P-1 Line #11 Volume 1 - 141 === page 192 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 FY Contractor and Location 2026 Northrop Grumman Systems / Florida SS / FPIF NAVAIR Jul 2027 Feb 2031 3 168,962.200 Y May 2026 Northrop Grumman Systems / Florida SS / CPIF NAVAIR Jul 2027 Nov 2031 6 159,734.400 Y May 2026 2023 Northrop Grumman Systems / Florida SS / FPIF NAVAIR Jul 2024 Feb 2028 2 80,390.000 Y Feb 2023 2024 Northrop Grumman Systems / Florida SS / FPIF NAVAIR Jul 2024 Jun 2028 2 86,870.000 Y Feb 2023 (†) 2022 Northrop Grumman Systems / Florida SS / FPIF NAVAIR Mar 2022 Feb 2026 5 51,303.800 Y Mar 2017 (†) 2023 Northrop Grumman Systems / Florida SS / FPIF NAVAIR Mar 2023 Mar 2027 5 47,584.000 Y Mar 2017 (†) 2026 Northrop Grumman Systems / Florida SS / CPIF NAVAIR Jul 2027 Feb 2031 3 104,996.700 Y May 2026 Northrop Grumman Systems / Florida SS / CPIF NAVAIR Jul 2027 Nov 2031 6 99,521.000 Y May 2026 2023 Northrop Grumman Systems / Florida SS / FPIF NAVAIR Jul 2024 Feb 2028 2 94,000.000 Y Feb 2023 2024 Northrop Grumman Systems / Florida SS / FPIF NAVAIR Jul 2024 Jun 2028 2 97,440.000 Y Feb 2023 (†) 1.1.1) Airframe/CFE (†) 1.1.1) Airframe/CFE 2027 1.1.2) Airframe/CFE (Congressional Add) (†) 1.1.2) Airframe/CFE (Congressional Add) (†) 1.1.3) CFE Electronics 1.1.3) CFE Electronics 1.1.3) CFE Electronics (†) 1.1.3) CFE Electronics 1.1.4) CFE Electronics (†) (Congressional Add) 1.1.4) CFE Electronics (†) (Congressional Add) (†) Item Number / Title [DODIC]: 1 / E-2D Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 0195 / E-2D AHE 2027 (9) (10) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date indicates the presence of a P-21 Footnotes: (9) FY27 A/C will award on contract at the same time as the FY26 funded lot. Due to this the FY27 A/C delivery will be delayed by 9 months and will not begin to deliver until after the delivery of the 3 FY26 A/C. (10) FY27 A/C will award on contract at the same time as the FY26 funded lot. Due to this the FY27 A/C delivery will be delayed by 9 months and will not begin to deliver until after the delivery of the 3 FY26 A/C. LI 0195 - E-2D AHE Navy UNCLASSIFIED Page 6 of 13 P-1 Line #11 Volume 1 - 142 === page 193 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0195 / E-2D AHE Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / E-2D Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) Airframe/CFE Prior Years Deliveries: 117 1 2026 NAVY 1 2027 NAVY 3 (11) 0 3 3 6 (12) 0 6 6 1.1.2) Airframe/CFE (Congressional Add) 2 2023 NAVY 2 0 2 2 2 2024 NAVY 2 0 2 2 1.1.3) CFE Electronics Prior Years Deliveries: 107 3 2022 NAVY 5 0 5 3 2023 NAVY 5 0 5 3 2026 NAVY (13) 0 3 3 3 2027 NAVY 6 0 6 6 2 3 A - - - - - - - - - - - - - - - - - - - 5 A - - - - - - - 5 1.1.4) CFE Electronics (Congressional Add) 4 2023 NAVY 4 2024 NAVY 2 (14) 0 2 2 (15) 0 2 2 O C T LI 0195 - E-2D AHE Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #11 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 143 === page 194 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0195 / E-2D AHE Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / E-2D Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) Airframe/CFE Prior Years Deliveries: 117 1 2026 NAVY 1 2027 NAVY 3 (11) 0 3 3 6 (12) 0 6 6 1.1.2) Airframe/CFE (Congressional Add) 2 2023 NAVY 2 0 2 A - - - - - - - - - - - - - - - 2 2 2024 NAVY 2 0 2 A - - - - - - - - - - - - - - - 2 1.1.3) CFE Electronics Prior Years Deliveries: 107 3 2022 NAVY 5 0 5 - - - - - - - - - - - - - - - - - - - - - - - - 5 3 2023 NAVY 5 0 5 - - - - - - - - - - - - - - - - - - - - - - - - 5 3 2026 NAVY (13) 0 3 3 3 2027 NAVY 6 0 6 6 3 1.1.4) CFE Electronics (Congressional Add) 4 2023 NAVY 4 2024 NAVY 2 (14) 0 2 A - - - - - - - - - - - - - - - 2 2 (15) 0 2 A - - - - - - - - - - - - - - - 2 O C T LI 0195 - E-2D AHE Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #11 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 144 === page 195 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0195 / E-2D AHE Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / E-2D Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) Airframe/CFE Prior Years Deliveries: 117 1 2026 NAVY 1 2027 NAVY 3 (11) 0 3 A - - - 3 6 (12) 0 6 A - - - 6 1.1.2) Airframe/CFE (Congressional Add) 2 2023 NAVY 2 0 2 - - - - - - - - - - - - - - - - - - - - - - - - 2 2 2024 NAVY 2 0 2 - - - - - - - - - - - - - - - - - - - - - - - - 2 - - - - - - - - 1.1.3) CFE Electronics Prior Years Deliveries: 107 3 2022 NAVY 5 0 5 - - - - 3 2023 NAVY 5 0 5 - - - - 3 2026 NAVY (13) 0 3 A - - - 3 3 2027 NAVY 6 0 6 A - - - 6 3 1 - - 1 - - 1 - - 1 - - - 1 - - - 1 - -1 - - 1 1 1 2 1.1.4) CFE Electronics (Congressional Add) 4 2023 NAVY 4 2024 NAVY 2 (14) 0 2 - - - - - - - - - - - - - - - - - - - - - - - - 2 2 (15) 0 2 - - - - - - - - - - - - - - - - - - - - - - - - 2 O C T LI 0195 - E-2D AHE Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #11 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 145 === page 196 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0195 / E-2D AHE Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / E-2D Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) Airframe/CFE Prior Years Deliveries: 117 1 2026 NAVY 1 2027 NAVY 3 (11) 0 3 - - - - - - - - - - - - - - - - - - - - - - - - 3 6 (12) 0 6 - - - - - - - - - - - - - - - - - - - - - - - - 6 1.1.2) Airframe/CFE (Congressional Add) 2 2023 NAVY 2 0 2 - - - - 2 2024 NAVY 2 0 2 - - - - 1 - - 1 - 0 - - 1 - 1 0 1.1.3) CFE Electronics Prior Years Deliveries: 107 3 2022 NAVY 5 6 -1 3 2023 NAVY 5 3 2 - 3 2026 NAVY (13) 0 3 - - - - - - - - - - - - - - - - - - - - - - - - 3 3 2027 NAVY 6 0 6 - - - - - - - - - - - - - - - - - - - - - - - - 6 3 -1 1 - 1 0 1.1.4) CFE Electronics (Congressional Add) 4 2023 NAVY 4 2024 NAVY 2 (14) 0 2 - - - - 2 (15) 0 2 - - - - O C T LI 0195 - E-2D AHE Navy N O V D E C J A N 1 - F E B 1 M A R 0 A P R M A Y 1 J U N J U L 1 A U G UNCLASSIFIED Page 10 of 13 0 S E P O C T N O V D E C J A N F E B P-1 Line #11 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 146 === page 197 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0195 / E-2D AHE Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / E-2D Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2031 M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) Airframe/CFE Prior Years Deliveries: 117 1 2026 NAVY 1 2027 NAVY 3 (11) 0 3 - - - - - - - - - - - - - - - - 6 (12) 0 6 - - - - - - - - - - - - - - - - 1 - - - - - 1 - - - - - 1 - - 0 - 6 1.1.2) Airframe/CFE (Congressional Add) 2 2023 NAVY 2 2 0 0 2 2024 NAVY 2 2 0 0 -1 1.1.3) CFE Electronics Prior Years Deliveries: 107 3 2022 NAVY 5 6 -1 3 2023 NAVY 5 5 0 3 2026 NAVY (13) 0 3 - - - - - - - - - - - - - - - - 3 2027 NAVY 6 0 6 - - - - - - - - - - - - - - - - 3 0 1 - - - - - 1 - - - - - 1 - - 0 - 6 1.1.4) CFE Electronics (Congressional Add) 4 2023 NAVY 4 2024 NAVY 2 (14) 2 0 2 (15) 2 0 0 0 O C T LI 0195 - E-2D AHE Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #11 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 147 === page 198 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0195 / E-2D AHE Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / E-2D Fiscal Year 2032 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2031 1 OCT Fiscal Year 2033 Calendar Year 2032 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2033 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.1.1) Airframe/CFE Prior Years Deliveries: 117 1 2026 NAVY 1 2027 NAVY 3 (11) 3 0 - 1 6 (12) 0 6 - 1 -1 - - 1 - - 1 - - 1 2 1.1.2) Airframe/CFE (Congressional Add) 2 2023 NAVY 2 2 0 0 2 2024 NAVY 2 2 0 0 -1 1.1.3) CFE Electronics Prior Years Deliveries: 107 3 2022 NAVY 5 6 -1 3 2023 NAVY 5 5 0 3 2026 NAVY (13) 3 0 - 1 3 2027 NAVY 6 0 6 - 1 3 0 -1 - - 1 - - 1 - - 1 2 1.1.4) CFE Electronics (Congressional Add) 4 2023 NAVY 4 2024 NAVY 2 (14) 2 0 2 (15) 2 0 0 0 O C T LI 0195 - E-2D AHE Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #11 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 148 === page 199 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0195 / E-2D AHE Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 Item Number / Title [DODIC]: 1 / E-2D Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Northrop Grumman Systems - Florida 4 6 8 0 0 0 0 5 10 43 53 2 Northrop Grumman Systems - Florida 4 6 8 0 0 0 0 7 5 38 43 3 Northrop Grumman Systems - Florida 4 6 8 0 0 0 0 5 10 43 53 4 Northrop Grumman Systems - Florida 4 6 8 0 0 0 0 7 5 38 43 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (11) Airframe CFE - FY 2026 P-21 schedule was updated from a quantity (qty) of 3 aircraft, to a qty of 4 aircraft delivering. Based on awarding the FY26 and FY27 A/C funding at the same time, with the FY27 being a VIQ and the production rate of 4 aircraft per year, the 1 FY27 funded A/C will deliver in 2031-11. (12) (13) VIQ will be negotiated as part of the FY26 A/C RFP to cover any additional A/C QTYs added after FY26. CFE Electronics - FY 2026 P-21 schedule was updated from a quantity (qty) of 3 aircraft, to a qty of 4 aircraft delivering. Based on awarding the FY26 and FY27 A/C funding at the same time, with the FY27 being a VIQ and the production rate of 4 aircraft per year, the 1 FY27 funded A/C will deliver in 2031-11. (14) (15) CFE Electronics - Congress added funding for 2 additional FY2023 aircraft. Both additional a/c awarded on contract in July 2024, one aircraft is tentatively scheduled to deliver in February 2028 and the other in April 2028 CFE Electronics - Congress added funding for 2 additional FY2024 aircraft. Both additional a/c awarded on contract in July 2024, one aircraft is tentatively scheduled to deliver in June 2028 and the other in August 2028 LI 0195 - E-2D AHE Navy UNCLASSIFIED Page 13 of 13 P-1 Line #11 Volume 1 - 149 === page 200 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 150 === page 201 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat Aircraft P-1 Line Item Number / Title: 0195 / E-2D AHE Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Gross/Weapon System Cost ($ in Millions) - - - 550.000 - 550.000 350.000 - - - - 900.000 Net Procurement (P-1) ($ in Millions) - - - 550.000 - 550.000 350.000 - - - - 900.000 Total Obligation Authority ($ in Millions) - - - 550.000 - 550.000 350.000 - - - - 900.000 Description: The E-2D Advanced Hawkeye (AHE) is an all-weather, twin engine, carrier-based, Airborne Command, Control and Surveillance aircraft designed to extend task force defense perimeters. The AHE mission is to provide advance warning of approaching enemy surface units and aircraft, to vector interceptors or strike aircraft to attack, and to provide area surveillance, intercept, search and rescue, communications relay, and strike/air traffic control. Key AHE objectives include improved battle space target detection and situational awareness, especially in the littorals; support of Theater Air Missile Defense operations; and improved Operational Availability. LI 0195 - E-2D AHE Navy UNCLASSIFIED Page 1 of 4 P-1 Line #12 Volume 1 - 151 === page 202 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 01: Combat Aircraft / BSA 1: Combat Aircraft P-1 Line Item Number / Title: 0195 / E-2D AHE Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 Exhibits Schedule Exhibit Type Title* ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-10 1 / E-2D 121 / - - / - 3/ - 6 / 550.000 - / - 6 / 550.000 P-40 Total Gross/Weapon System Cost 121 / - - / - 3/ - 6 / 550.000 - / - 6 / 550.000 *Title represents the P-10 Title for Advance Procurement. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Advance Procurement funding is requested for the long-lead requirements associated with the procurement items for E-2D aircraft in FY 2028 and FY 2029. Airframe requirements are calculated on a supplier's commitment, reflecting contractor's funding requirements for procurement of long lead parts and materials necessary to protect the delivery schedule. LI 0195 - E-2D AHE Navy UNCLASSIFIED Page 2 of 4 P-1 Line #12 Volume 1 - 152 === page 203 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 0195 / E-2D AHE Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 First System (2027) Award Date: July 2027 First System (2027) Completion Date: May 2033 E-2D Production Leadtime P-5 Number / Title: 1 / E-2D Interval Between Systems: 0 Months Prior Years (Months) FY 2025 (Each) Quantity When Required Prior Years (Months) FY 2026 (Each) 121 Cost Elements Date: April 2026 (Each) FY 2025 ($ M) FY 2027 (Each) 3 FY 2026 ($ M) 6 FY 2027 ($ M) ($ M) CFE FY 2027 EOQ/Long Lead - - - 550.000 Total: CFE - - - 550.000 Total Advance Procurement/Obligation Authority - - - 550.000 LI 0195 - E-2D AHE Navy 0 UNCLASSIFIED Page 3 of 4 P-1 Line #12 Volume 1 - 153 === page 204 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 01 / 1 P-1 Line Item Number / Title: 0195 / E-2D AHE Date: April 2026 P-5 Number / Title: 1 / E-2D FY 2027 Cost Elements Production Leadtime QPA (Months) (Each) Unit Cost ($ K) Contract Forecast Date 2027 Qty (Each) For FY Total Cost Request ($ M) CFE FY 2027 EOQ/Long Lead 1 550.000 Total: CFE 550.000 Total Advance Procurement/Obligation Authority 550.000 Description: The Advance Procurement (AP) funding will be used to procure full up Weapon Replaceable Assemblies (WRA) CFE items and to purchase items such as raw materials (inclusive of steel, titanium, aluminum, composites), castings, forgings, bearings, actuators, mission equipment, antenna assemblies, panel assemblies, gearboxes and airframe structural components. The E-2D program will utilize AP funding to actively pursue lead time reductions and secure the supply base of the current longest lead components. Some specific WRA AP items are the APY-9 Radar (36 months), ADS-18 antenna assembly (32 months), TARA assembly (20 months), landing gear (26 months) and empennage assembly including composite core materials and forged torque tubes for the empennage (31 months). LI 0195 - E-2D AHE Navy UNCLASSIFIED Page 4 of 4 P-1 Line #12 Volume 1 - 154 === page 205 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 03: Trainer Aircraft / BSA 1: Trainer Aircraft 0343 / Multi-Engine Training System (METS) ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 36 27 - - - - - - - - - 63 403.742 301.303 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - 705.045 403.742 403.742 301.303 301.303 To FY 2031 Complete - - - - - - - - - 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 - Total 705.045 705.045 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 41.020 - - - - - - - - - 41.020 Flyaway Unit Cost ($ in Thousands) 8,886.194 - 9,240.296 - - - - - - - - - 9,037.952 Gross/Weapon System Unit Cost ($ in Thousands) 11,215.056 11,159.370 - - - - - - - - - 11,191.190 Description: Multi-Engine Training System is a United States Navy (USN) program to replace the aging T-44C Pegasus fleet and modernize multi-engine aircraft training. Multi-Engine Training System provides an intermediate and advanced training platform for accession into P-8, EP-3, KC-130, E-6, E-2, CV-22 and MV-22 aircraft. This procurement will include a commercial T-54A aircraft, ground based training system, support equipment and miscellaneous essential training/support materials and services to include systems engineering, curriculum updates, and contractor logistics support. The acquisition plan includes budgeting and procuring a single, commercially available Type/Model/Series air vehicle with a digital cockpit (glass) without development, test, or modification of existing commercial equipment. The costs and quantities budgeted in this document are based on actuals for aircraft procurement and Ground Based Training System (GBTS). The anticipated aircraft service life is 30 years. LI 0343 - Multi-Engine Training System (METS) Navy UNCLASSIFIED Page 1 of 8 P-1 Line #14 Volume 1 - 155 === page 206 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 03: Trainer Aircraft / BSA 1: Trainer Aircraft 0343 / Multi-Engine Training System (METS) ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Multi-Engine Training System P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 36 / 403.742 27 / 301.303 - / 0.000 - / 0.000 - / 0.000 - / 0.000 36 / 403.742 27 / 301.303 - / 0.000 - / 0.000 - / 0.000 - / 0.000 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: T-54A will replace the T-44C aircraft. Support costs include costs that are fixed in nature and do not fluctuate with aircraft quantities in any particular year. Support cost provides funding for the procurement of airframe, engine, avionics peculiar ground support equipment and aircraft protective equipment to support site and squadron stand-ups. Support cost also includes the purchase of operational flight trainers, unit training devices, desktop avionics trainers, cockpit procedures trainers, non-recurring engineering to update commercial training devices for military unique training requirements and interim contractor logistics support. Additional costs are for data rights for the Ground Based Training System, curriculum gap analysis and the training courseware content update. T-44C is the only transitional platform from single engine to multi-engine Transport and Maritime fleet aircraft. The aging 44+ year old platform has become less cost effective to maintain annually as it has surpassed its fatigue life by greater than 50%. The aircraft is experiencing obsolescence, diminishing manufacturing sources and material shortages, and training capability gaps (as identified in the Capabilities Based Assessment Naval Undergraduate Flight Training). Additionally, operations and support costs for the legacy T-44 Aircraft Conditional Inspection (ACI), required every five years, have increased from $1.0M per aircraft ten years ago to $4.5M per aircraft today. A commercially available air vehicle will be the right solution to meet the needs of the Navy quickly, efficiently, and with the most economical intent. This plan provides ample amount of aircraft to transition to a more modern solution that better prepares pilots for fleet integration. This budget ensures a replacement multi-engine aircraft is delivered to the fleet as quickly as possible. LI 0343 - Multi-Engine Training System (METS) Navy UNCLASSIFIED Page 2 of 8 P-1 Line #14 Volume 1 - 156 === page 207 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0343 / Multi-Engine Training System (METS) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 03 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Multi-Engine Training System MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) FY 2025 FY 2026 36 27 403.742 301.303 - Net Procurement (P-1) ($ in Millions) 301.303 - Total Obligation Authority ($ in Millions) FY 2027 OOC - - - 0.000 0.000 0.000 0.000 - 403.742 Plus CY Advance Procurement ($ in Millions) FY 2027 Base - - - - 0.000 0.000 0.000 0.000 - 403.742 301.303 FY 2027 Total - - - - 0.000 0.000 0.000 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) 11,215.056 41.020 - - - - 11,159.370 - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost (†) 36 311.966 27 242.693 - - - - - - - - - - - - - - 7.937 - - 6.795 - - - - - - - - - - - - - - - - 319.903 - - 249.488 - - - - - - - - - - - - 319.903 - - 249.488 - - - - - - - - - - - - 2.1) Aircraft PGSE - 2.2) Engine PGSE - - 1.433 - - 0.766 - - - - - - - - - - - - - 2.866 - - 1.535 - - - - - - - - - - - 2.3) Avioinics PGSE - - - 0.602 - - 0.327 - - - - - - - - - - - - 2.4) Pub/Tech Eq - - 1.800 - - 0.703 - - - - - - - - - - - - 2.5) Pec Trng Eq - - 49.778 - - 40.420 - - - - - - - - - - - - 2.6) Prod Eng Supt - - 6.621 - - 3.820 - - - - - - - - - - - - 2.7) Other ILS - - 20.739 - - 4.244 - - - - - - - - - - - - Subtotal: Support Cost - - 83.839 - - 51.815 - - - - - - - - - - - - 36 403.742 27 301.303 - - 0.000 - - 0.000 - - 0.000 - - 0.000 1.1.1) Airframe/CFE 1.1.2) Rec Flyaway ECO Subtotal: Recurring Cost Subtotal: Flyaway Cost 8,665.722 8,988.630 Support Cost Gross/Weapon System Cost (†) 11,215.056 11,159.370 indicates the presence of a P-5a LI 0343 - Multi-Engine Training System (METS) Navy UNCLASSIFIED Page 3 of 8 P-1 Line #14 Volume 1 - 157 === page 208 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 03 / 1 Cost Elements (†) 1.1.1) Airframe/CFE (†) 1.1.1) Airframe/CFE (†) 1.1.1) Airframe/CFE (†) O O C P-1 Line Item Number / Title: 0343 / Multi-Engine Training System (METS) Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Multi-Engine Training System Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty FY Contractor and Location 2023 TEXTRON AVIATION INC / WICHITA KS C / FFP NAVAIR Jan 2023 Apr 2024 10 8,922.200 Y 2024 TEXTRON AVIATION INC / WICHITA KS C / FFP NAVAIR Dec 2023 Oct 2024 26 8,567.077 Y 2025 TEXTRON AVIATION INC / WICHITA KS C / FFP NAVAIR Nov 2024 Mar 2026 27 8,988.630 Y (Each) RFP Issue Date Dec 2021 indicates the presence of a P-21 LI 0343 - Multi-Engine Training System (METS) Navy UNCLASSIFIED Page 4 of 8 P-1 Line #14 Volume 1 - 158 === page 209 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0343 / Multi-Engine Training System (METS) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Multi-Engine Training System Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) Airframe/CFE 1 2023 NAVY 10 0 10 1 2024 NAVY 26 (1) 0 26 1 2025 NAVY 27 (2) 0 27 A - - - - - - - - - - - - - - - A - - - - 2 3 - 3 - 1 - 1 - 0 - - 26 27 O C T N O V LI 0343 - Multi-Engine Training System (METS) Navy D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 5 of 8 S E P O C T N O V D E C J A N F E B P-1 Line #14 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 159 === page 210 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0343 / Multi-Engine Training System (METS) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Multi-Engine Training System Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.1.1) Airframe/CFE 1 2023 NAVY 1 2024 NAVY 1 2025 NAVY 10 10 0 26 (1) 0 26 27 (2) 0 27 0 1 O C T - - - - A - - - - N O V LI 0343 - Multi-Engine Training System (METS) Navy D E C J A N F E B 2 2 M A R 1 A P R 3 M A Y 3 J U N 3 J U L A U G UNCLASSIFIED Page 6 of 8 2 4 S E P 3 O C T 1 N O V 1 D E C 0 J A N F E B P-1 Line #14 1 M A R 3 A P R 2 M A Y 4 J U N 2 J U L 1 A U G 1 13 S E P Volume 1 - 160 === page 211 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0343 / Multi-Engine Training System (METS) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 1 / Multi-Engine Training System Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.1.1) Airframe/CFE 1 2023 NAVY 1 2024 NAVY 1 2025 NAVY 10 10 0 26 (1) 26 0 27 (2) 14 13 0 0 2 O C T 1 N O V LI 0343 - Multi-Engine Training System (METS) Navy 2 D E C 1 J A N 3 F E B 2 M A R 1 A P R 1 M A Y 0 J U N J U L A U G UNCLASSIFIED Page 7 of 8 S E P O C T N O V D E C J A N F E B P-1 Line #14 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 161 === page 212 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0343 / Multi-Engine Training System (METS) Appropriation / Budget Activity / Budget Sub Activity: 1506N / 03 / 1 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: 1 / Multi-Engine Training System Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 TEXTRON AVIATION INC WICHITA KS MSR For 2027 1-8-5 For 2027 MAX For 2027 ALT Prior to Oct 1 10 24 36 10 ALT After Oct 1 Reorder Manufacturing PLT 4 15 Total After Oct 1 ALT Prior to Oct 1 19 ALT After Oct 1 0 Manufacturing PLT 3 Total After Oct 1 10 13 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (1) Lot II deliveries paused for four months due to propellor RPM analysis and UHF radio functionality. Textron Machinist Labor Union Strike in 2024 disrupted supply chain and delayed aircraft deliveries. In addition, Lot II deliveries were further delayed as Textron was experiencing production quality escapes requiring root cause investigation and corrective action. Deliveries resumed in March 2025. (2) Lot III deliveries will now extend into 3rd quarter FY 2027 due to delays experienced in Lot II. LI 0343 - Multi-Engine Training System (METS) Navy UNCLASSIFIED Page 8 of 8 P-1 Line #14 Volume 1 - 162 === page 213 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 04: Other Aircraft / BSA 1: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0416 / KC-130J Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total - 11 1 1 1 1 7 115 1,601.906 190.057 142.262 145.426 148.250 1,299.809 11,374.843 87 2 4 11 7,034.710 294.406 518.017 1,601.906 7,034.710 7,034.710 294.406 294.406 518.017 518.017 0.000 - - 1,601.906 0.000 - 1,601.906 - 1,601.906 0.000 1,601.906 FY 2028 FY 2029 190.057 190.057 To FY 2031 Complete FY 2030 142.262 142.262 145.426 145.426 148.250 1,299.809 148.250 Total 11,374.843 1,299.809 11,374.843 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 4.699 24.251 86.180 - 86.180 82.315 79.170 77.831 Flyaway Unit Cost ($ in Thousands) 73,774.954 - 133,043.000 127,924.250 140,030.727 - 140,030.727 180,609.000 139,465.000 142,590.000 145,885.000 79.218 Continuing 177,777.571 Continuing 92,082.904 Gross/Weapon System Unit Cost ($ in Thousands) 80,858.736 147,203.000 129,504.250 145,627.818 - 145,627.818 190,057.000 142,262.000 145,426.000 148,250.000 185,687.000 98,911.678 Description: The KC-130J aircraft is an all metal, high-wing, long-range, land-based monoplane. It is designed for cargo, tanker and troop carrier operations. For tanker operations, the aircrew will consist of a pilot, copilot, augmented crew member and two air refueling observers. Features include wing mounted refueling pods, an internal cargo ramp and door, crew and cargo compartment pressurization, ground and inflight refueling, thermal deicing systems, and a Heads-Up Display (HUD). It is designed to take off and land on unimproved runways. The KC-130J aircraft is powered by four Allison AE 2100D3 Turbo-Prop Engines with four six-bladed composite propellers. The cockpit includes state-of-the-art electronics with Liquid Crystal Display (LCD) instrumentation. The improved power performance of the KC-130J provides 40 percent greater range, 25 percent higher cruise ceiling, 46 percent decrease in time-to-climb, 21 percent increase in maximum speed and 41 percent decrease in maximum effort take-off run over the existing KC-130F/R/T models. The mission of the KC-130J is to provide tactical in-flight refueling and assault support transport. As a tactical transport, it is capable of conventional or aerial delivery of personnel or cargo. The aircraft is capable of carrying 92 combat troops or 64 paratroopers with equipment or 64 litters when configured as an ambulance. The aircraft is equipped for in-flight refueling to service two aircraft simultaneously and has a removable 3,600 gallon (13,627 liter) fuel tank in the cargo compartment. The KC-130J has the capability to refuel low-speed helicopters, tilt-rotor aircraft and high-speed jet aircraft. Aerial refueling of helicopters is normally conducted at 6,000 feet or below, at an airspeed of 115 KTS TAS and requires a ground change of the refueling basket. In response to the 2018 National Defense Strategy, the Marine Corps has refocused on potential threats in the Indo-Pacific region as an integral partner of the nation's naval expeditionary force and is implementing the Force Design plan. Included in that plan is the increase in VMGR capacity and the activation of a new KC-130J squadron at MCB Hawaii from FY2023-FY2026. The additional FY 2027 USNR aircraft, support equipment and training system procurements begin the C/KC-130T recapitalization towards the Program Of Record requirement and reestablishment of USNR aerial refueling capability to provide organic air-to-air and air delivered ground refueling in support of the Carrier Air Wing and Distributed Maritime Operations. The FY 2027 request for KC-130J includes $1,601,906 thousand of discretionary funding and $1,190,000 thousand of mandatory funding for a total of $2,791,906 thousand. FY 2027 total funding supports the procurement of nine (9) USMC KC-130J aircraft and nine (9) USNR (two (2) discretionary; seven (7) mandatory) KC-130J aircraft. FY 2026 spend plan amount for KC-130J includes $518,017 thousand of discretionary funding and $145,000 thousand of mandatory (reconciliation) funding for a total of $663,017 thousand. FY 2026 total funding supports the procurement of five (5) USNR (four (4) congressional add; one (1) mandatory) KC-130J aircraft. Initial spares Prior Year total = $366.424M; Initial spares TC = $146.560M; Total Initial Spares = $946.647M LI 0416 - KC-130J Navy UNCLASSIFIED Page 1 of 15 P-1 Line #15 Volume 1 - 163 === page 214 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy P-1 Line Item Number / Title: 0416 / KC-130J Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 04: Other Aircraft / BSA 1: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 Secondary Distribution NR Quantity Total Obligation Authority Total: Secondary Distribution LI 0416 - KC-130J Navy Quantity Total Obligation Authority FY 2027 Base FY 2026 Quantity Total Obligation Authority MCR FY 2025 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 2 4 2 - 2 1 - - 261.000 500.000 340.129 - 340.129 170.000 - - 9 - 9 1,261.777 - 1,261.777 - - 33.406 18.017 294.406 518.017 1,601.906 UNCLASSIFIED Page 2 of 15 - 20.057 - - 1,601.906 190.057 P-1 Line #15 - 1 1 1 142.262 145.426 148.250 142.262 145.426 148.250 Volume 1 - 164 === page 215 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 04: Other Aircraft / BSA 1: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0416 / KC-130J Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 000 Exhibits Schedule Exhibit Type Title* P-5 1 / KC-130J P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 87 / 7,034.710 2 / 294.406 4 / 518.017 11 / 1,601.906 - / 0.000 11 / 1,601.906 87 / 7,034.710 2 / 294.406 4 / 518.017 11 / 1,601.906 - / 0.000 11 / 1,601.906 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 request for KC-130J includes $1,601,906 thousand of discretionary funding and $1,190,000 thousand of mandatory funding for a total of $2,791,906 thousand. FY 2027 total funding supports the procurement of nine (9) USMC KC-130J aircraft and nine (9) USNR (two (2) discretionary; seven (7) mandatory) KC-130J aircraft, associated support equipment, and required GFE. Funding also includes production line Diminishing Manufacturing Sources and Material Shortages (DMSMS); support costs related to aircraft delivery; and funds an additional KC-130J Weapon Systems Trainer to meet USMC initial pilot production requirements. DMSMS is required to fund USMC/USNR shared costs with USAF to incorporate component redesigns into the production baseline affecting USMC/USNR aircraft deliveries through program completion. FY 2027 amount reflects estimated USMC/USNR shared costs in support of USAF contracting strategy. This budget supports aircraft delivery orders through FY 2031 via the USAF as the lead procurement agency. LI 0416 - KC-130J Navy UNCLASSIFIED Page 3 of 15 P-1 Line #15 Volume 1 - 165 === page 216 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0416 / KC-130J Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / KC-130J MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2026 4 11 7,034.710 294.406 518.017 1,601.906 - - 7,034.710 Plus CY Advance Procurement ($ in Millions) - 294.406 - Total Obligation Authority ($ in Millions) FY 2027 OOC 2 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2027 Base 87 - 7,034.710 - 0.000 - 518.017 1,601.906 - 1,601.906 - 294.406 11 0.000 - 518.017 FY 2027 Total - 1,601.906 - 1,601.906 0.000 1,601.906 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) 80,858.736 4.699 24.251 86.180 - 86.180 147,203.000 129,504.250 145,627.818 - 145,627.818 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost (†) 1.1.1) Airframe/CFE (1) 1.1.2) GFE Electronics (2) (3) 1.1.3) Other GFE 1.1.4) Block 8.1 DON LAIRCM Production Cut In (†) (4) 1.1.5) Carbon Brakes (†) (5) Production Cut-In 1.1.6) Industrial Capability Establishment (6) Subtotal: Recurring Cost 68,199.805 87 5,933.383 109,381.000 2 218.762 118,105.750 4 472.423 120,136.000 11 1,321.496 - - - 120,136.000 11 1,321.496 - - 153.252 - - 10.119 - - 7.193 - - 67.738 - - - - - 67.738 - - 54.770 - - 2.040 - - 1.426 - - 13.429 - - - - - 13.429 3,581.708 24 85.961 4,016.000 2 8.032 4,336.500 4 17.346 4,423.230 11 48.656 - - - 4,423.230 11 48.656 324.824 17 5.522 354.500 2 0.709 383.000 4 1.532 390.660 11 4.297 - - - 390.660 11 4.297 - - - - - 11.320 - - - - - 11.320 - - - - - - - 6,232.888 - - 185.533 - - - 185.533 - - 6,418.421 - - - - - 239.662 - - 499.920 - - 1,466.936 - - - - - 1,466.936 26.424 - - 11.777 - - 73.402 - - - - - 73.402 - 26.424 - - 11.777 - - 73.402 - - - - - 73.402 - 266.086 - - 511.697 - - 1,540.338 - - - - - 1,540.338 Non Recurring Cost 1.2.1) DMSMS/NonRecur Cost (7) Subtotal: Non Recurring Cost Subtotal: Flyaway Cost Support Cost LI 0416 - KC-130J Navy UNCLASSIFIED Page 4 of 15 P-1 Line #15 Volume 1 - 166 === page 217 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0416 / KC-130J Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / KC-130J MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements (8) Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - 14.830 - - - - - - - - 4.220 - - - - - 4.220 - - 14.073 - - - - - - - - 4.453 - - - - - 4.453 - - 22.089 - - - - - - - - 9.532 - - - - - 9.532 - - 280.111 - - 22.105 - - - - - 35.673 - - - - - 35.673 - - 5.534 - - 0.158 - - 0.162 - - 0.165 - - - - - 0.165 - - 112.434 - - 2.763 - - 2.733 - - 3.488 - - - - - 3.488 (13) - - 148.968 - - 3.294 - - 3.425 - - 4.037 - - - - - 4.037 2.8) Miscellaneous Support - - 18.250 - - - - - - - - - - - - - - - - - 616.289 - - 28.320 - - 6.320 - - 61.568 - - - - - 61.568 11 1,601.906 - - 11 1,601.906 2.1) Airframe PGSE 2.2) Engine PGSE (9) 2.3) Avionics PGSE 2.4) Pec Trng Eq (10) (11) 2.5) Pub/Tech Eq 2.6) Prod Eng Supt 2.7) Other ILS (12) Subtotal: Support Cost Gross/Weapon System Cost (†) 80,858.736 87 7,034.710 147,203.000 2 294.406 129,504.250 4 518.017 145,627.818 0.000 145,627.818 indicates the presence of a P-5a Footnotes: (1) 1.1.1: Total CFE cost includes cost elements 1.1.1, 1.1.4 and 1.1.5. USMC KC-130J aircraft Block 8.1 and DON LAIRCM (CE 1.1.4) and KC-130J Aircraft Carbon Brakes Production cut-in (CE 1.1.5) were awarded as part of the MYPIII Procurement contract (FY 2019-FY 2023) and planned for follow-on delivery orders via single year pricing (SYP) beginning in FY 2024. These costs are broken out separately from the Airframe/CFE costs to provide fidelity to unit cost composition. PY funding includes $7.2M Below Threshold Reprogramming (BTR) from BLI 0560 to support full funding of enacted USNR KC-130J aircraft. FY 2026 unit cost reflects pre-negotiation estimate and associated PGSE elements are unfunded. 1. FY 2026 for KC-130J includes $472.423 million of discretionary funding and $109.381 million of mandatory (Reconciliation) funding for a total of $581.804 million. FY 2026 total funding supports the procurement of four (4) USNR and one (1) Reconciliation) KC-130J aircraft. 2. The FY 2027 request for KC-130J includes $1,321.496 million of discretionary funding; and $846.498 million of mandatory (Reconciliation) funding for a total of $2,167.994 million. FY 2027 total funding supports the procurement of nine (9) USMC KC-130J aircraft and nine (9) USNR (two (2) baseline; seven (7) Reconciliation) KC-130J aircraft. (2) 1.1.2: 1. FY 2026 for KC-130J includes $7.193 million of discretionary funding and $5.889 million of mandatory (Reconciliation) funding for a total of $13.082 million. FY 2026 total funding supports the procurement of four (4) USNR and one (1) Reconciliation) KC-130J aircraft. 2. The FY 2027 request for KC-130J includes $67.738 million of discretionary funding; and $43.106 million of mandatory (Reconciliation) funding for a total of $110.844 million. FY 2027 total funding supports the procurement of nine (9) USMC KC-130J aircraft and nine (9) USNR (two (2) baseline; seven (7) Reconciliation) KC-130J aircraft. (3) 1.1.3: 1. FY 2026 for KC-130J includes $1.426 million of discretionary funding and $1.142 million of mandatory (Reconciliation) funding for a total of $2.568 million. FY 2026 total funding supports the procurement of four (4) USNR and one (1) Reconciliation) KC-130J aircraft. 2. The FY 2027 request for KC-130J includes $13.429 million of discretionary funding; and $8.546 million of mandatory (Reconciliation) funding for a total of $21.975 million. FY 2027 total funding supports the procurement of nine (9) USMC KC-130J aircraft and nine (9) USNR (two (2) baseline; seven (7) Reconciliation) KC-130J aircraft. (4) 1.1.4: 1. FY 2026 for KC-130J includes $17.346 million of discretionary funding and $4.016 million of mandatory (Reconciliation) funding for a total of $21.362 million. FY 2026 total funding supports the procurement of four (4) USNR and one (1) Reconciliation) KC-130J aircraft. 2. The FY 2027 request for KC-130J includes $48.656 million of discretionary funding; and $34.039 million of mandatory (Reconciliation) funding for a total of $82.695 million. FY 2027 total funding supports the procurement of nine (9) USMC KC-130J aircraft and nine (9) USNR (two (2) baseline; seven (7) Reconciliation) KC-130J aircraft. LI 0416 - KC-130J Navy UNCLASSIFIED Page 5 of 15 P-1 Line #15 Volume 1 - 167 === page 218 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 P-1 Line Item Number / Title: 0416 / KC-130J ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / KC-130J MDAP/MAIS Code: (5) 1.1.5: 1. FY 2026 for KC-130J includes $1.532 million of discretionary funding and $0.355 million of mandatory (Reconciliation) funding for a total of $1.887 million. FY 2026 total funding supports the procurement of four (4) USNR and one (1) Reconciliation) KC-130J aircraft. 2. The FY 2027 request for KC-130J includes $4.297 million of discretionary funding; and $3.006 million of mandatory (Reconciliation) funding for a total of $7.303 million. FY 2027 total funding supports the procurement of nine (9) USMC KC-130J aircraft and nine (9) USNR (two (2) baseline; seven (7) Reconciliation) KC-130J aircraft. (6) 1.1.6: FY 2027 funding to establish industrial capability to support expanding KC-130J fleet. Efforts include procurement of tooling, support equipment and test equipment. 1. The FY 2027 request for KC-130J includes $11.320 million of discretionary funding; and $16.980 million of mandatory (Reconciliation) funding for a total of $28.300 million. FY 2027 total funding supports the procurement of nine (9) USMC KC-130J aircraft and nine (9) USNR (two (2) baseline; seven (7) Reconciliation) KC-130J aircraft. (7) 1.2.1: Diminishing Manufacturing Sources and Material Shortages (DMSMS) addresses loss of suppliers of components and raw materials having significant impact on USMC/USNR KC-130J specific production configurations. DMSMS/NRE is required to fund USMC/USNR shared costs with USAF to incorporate component redesigns into the production baseline. FY 2027 amount reflects FY 2027 portion of cost share agreement with USAF. FY 2027 increase is due to procurement of 18 additional aircraft and introduction of new production A/C configurations caused by DMSMS changes that will require new and/or updated airworthiness certifications efforts. 1. FY 2026 for KC-130J includes $11.777 million of discretionary funding and $24.217 million of mandatory (Reconciliation) funding for a total of $35.994 million. FY 2026 total funding supports the procurement of four (4) USNR and one (1) Reconciliation) KC-130J aircraft. 2. The FY 2027 request for KC-130J includes $73.402 million of discretionary funding; and $81.426 million of mandatory (Reconciliation) funding for a total of $154.828 million. FY 2027 total funding supports the procurement of nine (9) USMC KC-130J aircraft and nine (9) USNR (two (2) baseline; seven (7) Reconciliation) KC-130J aircraft. (8) 2.1: FY 2027 increase to resume procurement of required Airframe PGSE to support procurement of KC-130J aircraft. 1. The FY 2027 request for KC-130J includes $4.220 million of discretionary funding; and $4.220 million of mandatory (Reconciliation) funding for a total of $8.440 million. FY 2027 total funding supports the procurement of nine (9) USMC KC-130J aircraft and nine (9) USNR (two (2) baseline; seven (7) Reconciliation) KC-130J aircraft. (9) 2.2: FY 2027 increase to resume procurement of required Engine PGSE to support procurement of KC-130J aircraft. 1. The FY 2027 request for KC-130J includes $4.453 million of discretionary funding; and $4.453 million of mandatory (Reconciliation) funding for a total of $8.906 million. FY 2027 total funding supports the procurement of nine (9) USMC KC-130J aircraft and nine (9) USNR (two (2) baseline; seven (7) Reconciliation) KC-130J aircraft. (10) 2.3: FY 2027 increase to resume procurement of required Avionics PGSE to support procurement of KC-130J aircraft. 1. The FY 2027 request for KC-130J includes $9.532 million of discretionary funding; and $9.532 million of mandatory (Reconciliation) funding for a total of $19.064 million. FY 2027 total funding supports the procurement of nine (9) USMC KC-130J aircraft and nine (9) USNR (two (2) baseline; seven (7) Reconciliation) KC-130J aircraft. (11) 2.4: FY 2027 increase is due to addition of one (1) USMC (discretionary) and two (2) USNR (Reconciliation) KC-130J Weapons System Trainers, two (2) USNR Fuselage Trainers (Reconciliation), and one (1) USNR Observer Trainer (Reconciliation) to meet KC-130J initial pilot production requirements for VMGR/VR squadrons. 1. The FY 2027 request for KC-130J includes $35.673 million of discretionary funding; and $138.194 million of mandatory (Reconciliation) funding for a total of $173.867 million. FY 2027 total funding supports the procurement of nine (9) USMC KC-130J aircraft and nine (9) USNR (two (2) baseline; seven (7) Reconciliation) KC-130J aircraft. (12) (13) 2.6: FY 2027 increase to support increased procurement quantities and additional requirements associated with combined USNR and USMC KC-130J aircraft procurements. 2.7: FY 2027 increase to support increased procurement quantities and additional requirements associated with combined USNR and USMC KC-130J aircraft procurements. LI 0416 - KC-130J Navy UNCLASSIFIED Page 6 of 15 P-1 Line #15 Volume 1 - 168 === page 219 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Cost Elements (†) 1.1.1) Airframe/CFE (†) 1.1.1) Airframe/CFE (†) 1.1.1) Airframe/CFE (†) 1.1.1) Airframe/CFE (†) 1.1.1) Airframe/CFE (†) 1.1.1) Airframe/CFE 1.1.4) Block 8.1 DON LAIRCM Production Cut In (†) 1.1.4) Block 8.1 DON LAIRCM Production Cut In (†) 1.1.4) Block 8.1 DON LAIRCM Production Cut In (†) 1.1.4) Block 8.1 DON LAIRCM Production Cut In (†) 1.1.4) Block 8.1 DON LAIRCM Production Cut In (†) 1.1.4) Block 8.1 DON LAIRCM Production Cut In (†) 1.1.5) Carbon Brakes Production Cut-In (†) 1.1.5) Carbon Brakes Production Cut-In (†) 1.1.5) Carbon Brakes Production Cut-In (†) 1.1.5) Carbon Brakes Production Cut-In (†) 1.1.5) Carbon Brakes Production Cut-In (†) 1.1.5) Carbon Brakes Production Cut-In (†) LI 0416 - KC-130J Navy O O C P-1 Line Item Number / Title: 0416 / KC-130J Item Number / Title [DODIC]: 1 / KC-130J FY Contractor and Location Method/Type or Funding Vehicle 2022 LMAS / Marrietta, GA SS / FFP USAF Wright Patterson Ohio Dec 2021 Dec 2023 6 81,881.330 Y 2023 LMAS / Marrietta, GA SS / FFP USAF Wright Patterson Ohio Dec 2022 Mar 2026 5 83,857.327 Y 2024 LMAS / Marrietta, GA SS / FFP USAF Wright Patterson Ohio May 2026 May 2029 3 106,693.000 Y 2025 LMAS / Marrietta, GA SS / FFP USAF Wright Patterson Ohio May 2026 May 2029 2 109,381.000 Y 2026 LMAS / Marrietta, GA SS / FFP USAF Wright Patterson Ohio Mar 2027 Mar 2030 4 118,105.750 Y 2027 LMAS / Marrietta, GA SS / FFP USAF Wright Patterson Ohio Mar 2028 Apr 2031 11 120,136.000 Y 2022 LMAS / Marrietta, GA SS / FFP USAF Wright Patterson Ohio Dec 2021 Dec 2023 6 3,118.330 Y 2023 LMAS / Marrietta, GA SS / FFP USAF Wright Patterson Ohio Dec 2022 Mar 2026 5 3,830.000 Y 2024 LMAS / Marrietta, GA SS / FFP USAF Wright Patterson Ohio May 2026 May 2029 3 3,984.667 Y 2025 LMAS / Marrietta, GA SS / FFP USAF Wright Patterson Ohio May 2026 May 2029 2 4,016.000 Y 2026 LMAS / Marrietta, GA SS / FFP USAF Wright Patterson Ohio Mar 2027 Mar 2030 4 4,336.500 Y 2027 LMAS / Marrietta, GA SS / FFP USAF Wright Patterson Ohio Mar 2028 Apr 2031 11 4,423.230 Y 2022 LMAS / Marrietta, GA SS / FFP USAF Wright Patterson Ohio Dec 2021 Dec 2023 6 275.667 Y 2023 LMAS / Marrietta, GA SS / FFP USAF Wright Patterson Ohio Dec 2022 Mar 2026 5 338.200 Y 2024 LMAS / Marrietta, GA SS / FFP USAF Wright Patterson Ohio May 2026 May 2029 3 352.000 Y 2025 LMAS / Marrietta, GA SS / FFP USAF Wright Patterson Ohio May 2026 May 2029 2 354.500 Y 2026 LMAS / Marrietta, GA SS / FFP USAF Wright Patterson Ohio Mar 2027 Mar 2030 4 383.000 Y 2027 LMAS / Marrietta, GA SS / FFP USAF Wright Patterson Ohio Mar 2028 Apr 2031 11 390.660 Y Location of PCO UNCLASSIFIED Page 7 of 15 Award Date Date of First Delivery P-1 Line #15 Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date Volume 1 - 169 === page 220 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 (†) P-1 Line Item Number / Title: 0416 / KC-130J Item Number / Title [DODIC]: 1 / KC-130J indicates the presence of a P-21 LI 0416 - KC-130J Navy UNCLASSIFIED Page 8 of 15 P-1 Line #15 Volume 1 - 170 === page 221 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0416 / KC-130J Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / KC-130J Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 73 1 2022 NAVY 6 0 6 1 2023 NAVY 5 0 5 1 2024 NAVY 3 0 3 3 1 2025 NAVY 2 0 2 2 1 2026 NAVY 4 0 4 4 1 2027 NAVY 11 0 11 11 1.1.4) Block 8.1 DON LAIRCM Production Cut In A - - - - - - - - - - - - - - - - - - - - - - 6 A - - - - - - - - - - 5 (4) Prior Years Deliveries: 10 2 2022 NAVY 6 0 6 2 2023 NAVY 5 0 5 2 2024 NAVY 3 0 3 3 2 2025 NAVY 2 0 2 2 2 2026 NAVY 4 0 4 4 2 2027 NAVY 11 0 11 11 1.1.5) Carbon Brakes Production Cut-In A - - - - - - - - - - - - - - - - - - - - - - 6 A - - - - - - - - - - 5 (5) Prior Years Deliveries: 3 3 2022 NAVY 6 0 6 3 2023 NAVY 5 0 5 A - 3 2024 NAVY 3 0 3 3 3 2025 NAVY 2 0 2 2 3 2026 NAVY 4 0 4 4 3 2027 NAVY 11 0 11 11 O C T LI 0416 - KC-130J Navy N O V D E C - J A N - F E B - M A R - A P R - M A Y - J U N - J U L - A U G UNCLASSIFIED Page 9 of 15 - S E P - O C T - N O V - - - - - - - - - - 6 A - - - - - - - - - - 5 D E C J A N F E B P-1 Line #15 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 171 === page 222 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0416 / KC-130J Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / KC-130J Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 73 1 2022 NAVY 6 0 6 - - 1 2023 NAVY 5 0 5 - - 1 2024 NAVY 3 0 3 3 1 2025 NAVY 2 0 2 2 1 2026 NAVY 4 0 4 4 1 2027 NAVY 11 0 11 11 1.1.4) Block 8.1 DON LAIRCM Production Cut In 1 - - - - - - - 1 - - 1 - - - - - - 1 - - - - - 1 - - - - - - - - - - 1 - - - - - - - - - 5 (4) Prior Years Deliveries: 10 2 2022 NAVY 6 0 6 - - 2 2023 NAVY 5 0 5 - - 2 2024 NAVY 3 0 3 3 2 2025 NAVY 2 0 2 2 2 2026 NAVY 4 0 4 4 2 2027 NAVY 11 0 11 11 1.1.5) Carbon Brakes Production Cut-In 1 - - - - - - - 1 - - 1 - - - - - - 1 - - - - - 1 - - - - - - - - - - 1 - - - - - - - - - 5 (5) Prior Years Deliveries: 3 3 2022 NAVY 6 0 6 - - 3 2023 NAVY 5 0 5 - - 3 2024 NAVY 3 0 3 3 3 2025 NAVY 2 0 2 2 3 2026 NAVY 4 0 4 4 3 2027 NAVY 11 0 11 11 O C T LI 0416 - KC-130J Navy N O V 1 - D E C J A N - - - - - - F E B M A R 1 - - A P R 1 - M A Y - J U N J U L - - - - A U G UNCLASSIFIED Page 10 of 15 1 - S E P O C T - - - - N O V 1 - D E C J A N - - - - - - - - - 1 - - - - - - - - - 5 F E B P-1 Line #15 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 172 === page 223 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0416 / KC-130J Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / KC-130J Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 73 1 2022 NAVY 6 5 1 - 1 2023 NAVY 5 0 5 - 1 2024 NAVY 3 0 3 A - - - - - - - - - - - - - - - - - 3 1 2025 NAVY 2 0 2 A - - - - - - - - - - - - - - - - - 2 1 2026 NAVY 4 0 4 A - - - - - - - 1 2027 NAVY 11 0 11 1.1.4) Block 8.1 DON LAIRCM Production Cut In 1 0 - - - - 2 3 0 4 11 (4) Prior Years Deliveries: 10 2 2022 NAVY 6 5 1 - 2 2023 NAVY 5 0 5 - 2 2024 NAVY 3 0 3 A - - - - - - - - - - - - - - - - - 3 2 2025 NAVY 2 0 2 A - - - - - - - - - - - - - - - - - 2 2 2026 NAVY 4 0 4 A - - - - - - - 2 2027 NAVY 11 0 11 1.1.5) Carbon Brakes Production Cut-In 1 0 - - - - 2 3 0 4 11 (5) Prior Years Deliveries: 3 3 2022 NAVY 6 5 1 - 3 2023 NAVY 5 0 5 - 3 2024 NAVY 3 0 3 A - - - - - - - - - - - - - - - - - 3 3 2025 NAVY 2 0 2 A - - - - - - - - - - - - - - - - - 2 3 2026 NAVY 4 0 4 A - - - - - - - 3 2027 NAVY 11 0 11 0 - - - 2 3 0 4 11 O C T LI 0416 - KC-130J Navy 1 - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #15 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 173 === page 224 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0416 / KC-130J Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / KC-130J Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 73 1 2022 NAVY 6 6 0 1 2023 NAVY 5 5 0 1 2024 NAVY 3 0 3 - - - - - - - - - - - - - - - - - - - 1 1 2025 NAVY 2 0 2 - - - - - - - - - - - - - - - - - - - 2 1 2026 NAVY 4 0 4 - - - - - - - - - - - - - - - - - - - 1 2027 NAVY 11 0 11 A - - - - - - - - - - - - - - 1.1.4) Block 8.1 DON LAIRCM Production Cut In 0 0 - - 1 - 1 - - - - - 4 - - - - - 11 0 (4) Prior Years Deliveries: 10 2 2022 NAVY 6 6 0 2 2023 NAVY 5 5 0 2 2024 NAVY 3 0 3 - - - - - - - - - - - - - - - - - - - 1 2 2025 NAVY 2 0 2 - - - - - - - - - - - - - - - - - - - 2 2 2026 NAVY 4 0 4 - - - - - - - - - - - - - - - - - - - 2 2027 NAVY 11 0 11 A - - - - - - - - - - - - - - 1.1.5) Carbon Brakes Production Cut-In 0 0 - - 1 - 1 - - - - - 4 - - - - - 11 0 (5) Prior Years Deliveries: 3 3 2022 NAVY 6 6 0 3 2023 NAVY 5 5 0 0 3 2024 NAVY 3 0 3 - - - - - - - - - - - - - - - - - - - 1 3 2025 NAVY 2 0 2 - - - - - - - - - - - - - - - - - - - 2 3 2026 NAVY 4 0 4 - - - - - - - - - - - - - - - - - - - 3 2027 NAVY 11 0 11 A - - - - - - - - - - - - - - 0 O C T LI 0416 - KC-130J Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #15 M A R A P R M A Y - - 1 - 1 - - - - - 4 - - - - - 11 0 J U N J U L A U G S E P Volume 1 - 174 === page 225 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0416 / KC-130J Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / KC-130J Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2031 M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 73 1 2022 NAVY 6 6 0 1 2023 NAVY 5 5 0 1 2024 NAVY 3 2 1 1 2025 NAVY 2 2 0 1 2026 NAVY 4 0 1 2027 NAVY 11 0 1.1.4) Block 8.1 DON LAIRCM Production Cut In 0 0 - - - - - 4 - - - - - 11 - - - - - - - - - - - - 1 0 0 1 - - 1 - - - 1 - - - 1 - 0 - - - - - - - 1 2 1 2 1 2 2 (4) Prior Years Deliveries: 10 2 2022 NAVY 6 6 0 2 2023 NAVY 5 5 0 2 2024 NAVY 3 2 1 2 2025 NAVY 2 2 0 2 2026 NAVY 4 0 2 2027 NAVY 11 1.1.5) Carbon Brakes Production Cut-In 0 0 - - - - - 4 - - - - - 0 11 - - - - - - - - - - - - 1 0 0 1 - - 1 - - - 1 - - - 1 - 0 - - - - - - - 1 2 1 2 1 2 2 (5) Prior Years Deliveries: 3 3 2022 NAVY 6 6 0 3 2023 NAVY 5 5 0 3 2024 NAVY 3 2 1 3 2025 NAVY 2 2 0 3 2026 NAVY 4 0 3 2027 NAVY 11 0 0 0 - - - - - 4 - - - - - 11 - - - - - - - - - - - 1 0 0 O C T LI 0416 - KC-130J Navy - N O V D E C J A N F E B 1 - M A R 1 A P R - M A Y 1 J U N - J U L 1 A U G UNCLASSIFIED Page 13 of 15 0 S E P O C T N O V D E C J A N F E B P-1 Line #15 M A R 1 A P R 2 M A Y 1 J U N 2 J U L 1 A U G 2 S E P Volume 1 - 175 2 === page 226 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0416 / KC-130J Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / KC-130J Fiscal Year 2032 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2031 1 OCT Fiscal Year 2033 Calendar Year 2032 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2033 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 73 1 2022 NAVY 6 6 0 0 1 2023 NAVY 5 5 0 0 1 2024 NAVY 3 3 0 0 1 2025 NAVY 2 2 0 0 1 2026 NAVY 4 4 0 1 2027 NAVY 11 9 2 1.1.4) Block 8.1 DON LAIRCM Production Cut In 0 1 1 0 (4) Prior Years Deliveries: 10 2 2022 NAVY 6 6 0 0 2 2023 NAVY 5 5 0 0 2 2024 NAVY 3 3 0 0 2 2025 NAVY 2 2 0 0 2 2026 NAVY 4 4 0 2 2027 NAVY 11 9 2 1.1.5) Carbon Brakes Production Cut-In 0 1 1 0 (5) Prior Years Deliveries: 3 3 2022 NAVY 6 6 0 0 3 2023 NAVY 5 5 0 0 3 2024 NAVY 3 3 0 0 3 2025 NAVY 2 2 0 0 3 2026 NAVY 4 4 0 3 2027 NAVY 11 9 2 0 1 O C T LI 0416 - KC-130J Navy 1 N O V 0 D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #15 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 176 === page 227 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0416 / KC-130J Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Item Number / Title [DODIC]: 1 / KC-130J Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 LMAS - Marrietta, GA 12 24 36 0 6 36 42 0 6 37 43 2 LMAS - Marrietta, GA 12 24 36 0 6 36 42 0 6 37 43 3 LMAS - Marrietta, GA 12 24 36 0 6 36 42 0 6 37 43 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0416 - KC-130J Navy UNCLASSIFIED Page 15 of 15 P-1 Line #15 Volume 1 - 177 === page 228 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 178 === page 229 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 04: Other Aircraft / BSA 1: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 0442 / MQ-4 TRITON Program Elements for Code B Items: 0305220N, 0305421N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 373 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 22 4,474.681 4,474.681 4,474.681 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 22 86.414 96.509 83.667 0.201 - 5,128.863 159.226 159.226 159.226 123.839 123.839 123.839 104.326 - 0.000 - 104.326 - 0.000 - 104.326 0.000 104.326 104.326 104.326 To FY 2031 Complete - - - - - 86.414 96.509 83.667 0.201 - - - - - - 86.414 96.509 83.667 0.201 - Total 5,128.863 5,128.863 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 3.072 - - - - - - - - - 3.072 Flyaway Unit Cost ($ in Thousands) 147,188.636 - - - - - - - - - - - 148,090.591 Gross/Weapon System Unit Cost ($ in Thousands) 203,394.591 - - - - - - - - - - 233,130.136 Description: The MQ-4C Triton is a high altitude-long endurance UAS designed to provide Fleet and combatant commanders with persistent maritime Intelligence, Surveillance and Reconnaissance (ISR) of nearly all the world's high-density sea-lanes, littorals, and areas of national interest. The MQ-4C air vehicle, mission control system, specialized sensors, and communications suite play a significant role in achieving the Navy's strategic vision for the 21st century. The Triton system provides persistent ISR and unparalleled situational awareness of the maritime battle space to the supported combatant commander and fleet commander. The system also serves as a Fleet response plan enabler with a persistent, global force offering to provide critical trip wire information for intelligence preparation of the environment. Triton provides the Warfighter with unprecedented levels of battlespace awareness to synchronize actions necessary to maintain maritime Full Spectrum Superiority. Teamed with its manned-capability counterpart, the P-8A, Triton is a key component of the Navy's maritime domain awareness family of systems. MQ-4C Triton leverages Maritime Patrol and Reconnaissance Force manpower, training and maintenance efficiencies. Following successful EOC deployment in 2020, the MQ-4C Triton UAS is currently developing incremental capabilities within the ongoing acquisition program to meet program requirements in support of the 2011 National Defense Authorization Act (NDAA), and to meet EP-3 sundown and the Maritime Intelligence, Surveillance, Reconnaissance and Targeting (MISR&T) transition plan. The full MQ-4C Triton sensor suite will provide near worldwide coverage through a network of orbits inside and outside continental United States, with sufficient air vehicles to remain airborne for 24 hours a day, 7 days a week, out to ranges of 2,000 nautical miles. Onboard sensors will provide detection, classification, tracking and identification of maritime targets and include maritime radar, electro-optical/infra-red and SIGINT systems. Additionally, the MQ-4C communications relay capability will link dispersed forces in the theater of operations and allow Triton to serve as a node in the Navy's networked strategy. Tactical-level data analysis will occur in real-time at shore-based mission control sites connected to the air vehicle via satellite communications. Further intelligence exploitation can be conducted at Fleet shore-based sites or aboard aircraft carriers and other ships. The FY 2027 request provides funding to support production line aircraft through final aircraft delivery in October 2028 (FY 2029), and depot repair capability associated with airframe, avionics, and mission control systems. These activities include funding levels in the Support costs to include peculiar training equipment, peculiar ground support equipment, government and contractor production team, organic and OEM depot capability establishment and fielding of IFC-4 assets in support of OCONUS orbit activations and fleet operations. The program will fund priority sub-system depot maintenance capability and will utilize the Original Equipment Manufacturer (OEM) during the establishment period for depot capability. The MQ-4C Triton UAS is integral to recapitalizing the Navy's Maritime Patrol and Reconnaissance Force. IOC: 4Q FY 2023 LI 0442 - MQ-4 TRITON Navy UNCLASSIFIED Page 1 of 10 P-1 Line #16 Volume 1 - 179 === page 230 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 04: Other Aircraft / BSA 1: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 0442 / MQ-4 TRITON Program Elements for Code B Items: 0305220N, 0305421N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 373 Exhibits Schedule Exhibit Type Title* P-5 1 / RQ-4 UAV P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 22 / 4,474.681 - / 159.226 - / 123.839 - / 104.326 - / 0.000 - / 104.326 22 / 4,474.681 - / 159.226 - / 123.839 - / 104.326 - / 0.000 - / 104.326 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 request supports key elements that include peculiar training equipment, peculiar ground support equipment, organic depot repair capability, and the Government and contractor production team. Production of the MQ-4C aircraft completes with the last aircraft delivery in FY 2029. LI 0442 - MQ-4 TRITON Navy UNCLASSIFIED Page 2 of 10 P-1 Line #16 Volume 1 - 180 === page 231 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0442 / MQ-4 TRITON Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / RQ-4 UAV MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 22 Gross/Weapon System Cost ($ in Millions) - 4,474.681 Less PY Advance Procurement ($ in Millions) 159.226 - Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) 104.326 - 0.000 - 123.839 104.326 - 104.326 - 159.226 FY 2027 Total 0.000 - 123.839 - 4,474.681 - - 159.226 - Total Obligation Authority ($ in Millions) FY 2027 OOC - 123.839 - 4,474.681 FY 2027 Base - 104.326 - 104.326 - 0.000 104.326 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) 3.072 - - - - - - - - - 203,394.591 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost (†) 1.1.1) Airframe/CFE (1) 82,443.591 22 1,813.759 - - - - - - - - - - - - - - - 1.1.2) CFE Electronics - - 660.205 - - - - - - - - - - - - - - - 1.1.3) GFE Electronics - - 0.429 - - - - - - - - - - - - - - - 1.1.4) Engines/Eng Acc - - 89.899 - - - - - - - - - - - - - - - 1.1.5) Other GFE - - 197.425 - - - - - - - - - - - - - - - 1.1.6) Rec Flyaway ECO - - 43.012 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 2,804.729 - - - - - - - - - - - - - - - 1.2.1) Production Line Shutdown - - - - 19.843 - - - - - - - - - - - - 1.2.2) Non-Recur Cost - - 289.834 - - - - - - - - - - - - - - - 1.2.3) Other - - 143.587 - - - - - - - - - - - - - - - - - 433.421 - - 19.843 - - - - - - - - - - - - - - 3,238.150 - - 19.843 - - - - - - - - - - - - - - 347.567 - - 50.543 - - 83.910 - - 76.709 - - - - - 76.709 Non Recurring Cost Subtotal: Non Recurring Cost Subtotal: Flyaway Cost - Support Cost 2.1) Airframe PGSE (2) LI 0442 - MQ-4 TRITON Navy UNCLASSIFIED Page 3 of 10 P-1 Line #16 Volume 1 - 181 === page 232 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0442 / MQ-4 TRITON Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / RQ-4 UAV MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) 2.2) Peculiar Training Equipment (3) (4) FY 2025 Total Cost Qty (Each) ($ M) - - Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) 165.454 - - ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) 19.471 - - ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) 1.516 - - ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) 0.387 - - - - - 0.387 - - 63.161 - - 4.740 - - 4.500 - - - - - - - - - 2.4) Prod Eng Supt - - 271.222 - - 36.757 - - 11.388 - - 9.290 - - - - - 9.290 2.5) Other ILS - - 371.074 - - 27.872 - - 22.525 - - 17.940 - - - - - 17.940 2.6) FY 2021 Enacted Recissions - - 18.053 - - - - - - - - - - - - - - - - 1,236.531 - - 139.383 - - 123.839 - - 104.326 - - - - - 104.326 22 4,474.681 - - 159.226 - - 123.839 - - 104.326 - - 0.000 - - 104.326 2.3) Pub/Tech Equip Subtotal: Support Cost Gross/Weapon System Cost (†) 203,394.591 - indicates the presence of a P-5a Footnotes: (1) The MQ-4C Triton inventory total Program of Record (POR) UA quantity of 27. The total number of aircraft are attributed to the program as 22 production, and 5 development (includes 1 test asset, 1 stricken UA and 25 fleet assets). (2) Airframe PGSE supports the investment required to continue to establish organic depot and intermediate repair and maintenance capability. Organic depot and intermediate level repair and maintenance standup creates the capability for the Navy to support Triton operations at a lower lifecycle cost at required readiness levels. Year-to-year costs fluctuate due to the varying establishment of repair capability each year for major components to include MFAS (Multi-Function Active Sensor), SIGINT (Signals Intelligence), airframe and communications equipment, which must be in place to meet minimum Orbit readiness levels. As Orbit 2 and 3 are operational in FY24 and FY25 respectively, repair and depot capabilities are essential to maintain readiness with the increased level of operational use. (3) Peculiar Training Equipment is required to support aircraft fielding and includes the necessary fidelity for Fleet user familiarization and throughput capacity to align with Orbit standup. Decrease in this line between FY 2026 and FY 2027 attributed to the transition of production related training requirements from BLI 0442 to BLI 0596 to support the modification of training systems in order to maintain pace with aircraft configurations, mission readiness and fleet requirements. (4) Pub/Tech Equipment decreased between FY 2026 to FY 2027 as the program transitions away from production with the last aircraft delivery in October 2028 (FY2029). LI 0442 - MQ-4 TRITON Navy UNCLASSIFIED Page 4 of 10 P-1 Line #16 Volume 1 - 182 === page 233 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Cost Elements (†) 1.1.1) Airframe/CFE (†) 1.1.1) Airframe/CFE (†) 1.1.1) Airframe/CFE (†) O O C P-1 Line Item Number / Title: 0442 / MQ-4 TRITON Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / RQ-4 UAV Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty RFP Issue Date FY Contractor and Location 2022 Northrop Grumman / Rancho Bernardo, CA SS / FP NAVAIR Jun 2022 Sep 2026 2 103,305.000 Y Sep 2020 2023 Northrop Grumman / Rancho Bernardo, CA SS / FPIF NAVAIR Oct 2023 Mar 2027 3 86,991.000 Y Jun 2022 2024 Northrop Grumman / Rancho Bernardo, CA SS / FPIF NAVAIR Mar 2025 Jul 2028 2 113,078.500 Y Feb 2023 (Each) indicates the presence of a P-21 LI 0442 - MQ-4 TRITON Navy UNCLASSIFIED Page 5 of 10 P-1 Line #16 Volume 1 - 183 === page 234 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0442 / MQ-4 TRITON Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / RQ-4 UAV Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 15 1 2022 NAVY 2 0 2 1 2023 NAVY 3 0 3 1 2024 NAVY 2 0 2 A - - - - - - - - - - - - - - - 2 3 2 O C T LI 0442 - MQ-4 TRITON Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #16 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 184 === page 235 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0442 / MQ-4 TRITON Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / RQ-4 UAV Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 15 1 2022 NAVY 2 0 2 - - - - - - - - - - - - - - - - - - - - - - - - 2 1 2023 NAVY 3 0 3 A - - - - - - - - - - - - - - - - - - - - - - - - 3 1 2024 NAVY 2 0 2 A - - - - - - - 2 O C T LI 0442 - MQ-4 TRITON Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #16 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 185 === page 236 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0442 / MQ-4 TRITON Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / RQ-4 UAV Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 15 1 2022 NAVY 2 0 2 - - - - - - - - - - - - - - 1 2023 NAVY 3 0 3 - - - - - - - - - - - - - - - - - 1 2024 NAVY 2 0 2 - - - - - - - - - - - - - - - - - O C T LI 0442 - MQ-4 TRITON Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 10 1 S E P O C T N O V D E C 1 J A N 0 F E B P-1 Line #16 1 M A R A P R - - - M A Y 1 J U N J U L - - - A U G 1 S E P Volume 1 - 186 0 2 === page 237 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0442 / MQ-4 TRITON Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / RQ-4 UAV Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 15 1 2022 NAVY 2 2 0 1 2023 NAVY 3 3 0 1 2024 NAVY 2 0 2 0 0 O C T LI 0442 - MQ-4 TRITON Navy N O V D E C J A N F E B M A R A P R M A Y J U N 1 J U L A U G UNCLASSIFIED Page 9 of 10 S E P 1 O C T 0 N O V D E C J A N F E B P-1 Line #16 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 187 === page 238 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0442 / MQ-4 TRITON Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Item Number / Title [DODIC]: 1 / RQ-4 UAV Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Northrop Grumman - Rancho Bernardo, CA MSR For 2027 1-8-5 For 2027 MAX For 2027 ALT Prior to Oct 1 3 6 12 12 ALT After Oct 1 Reorder Manufacturing PLT 10 21 Total After Oct 1 ALT Prior to Oct 1 31 12 ALT After Oct 1 Manufacturing PLT 7 Total After Oct 1 34 41 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0442 - MQ-4 TRITON Navy UNCLASSIFIED Page 10 of 10 P-1 Line #16 Volume 1 - 188 === page 239 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 04: Other Aircraft / BSA 1: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 0449 / MQ-25 Program Elements for Code B Items: 0207255N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: P462 Resource Summary Procurement Quantity (Units in Each) Prior Years FY 2025 - - Gross/Weapon System Cost ($ in Millions) 97.484 61.979 Less PY Advance Procurement ($ in Millions) 97.484 11.979 Net Procurement (P-1) ($ in Millions) 0.000 50.000 FY 2027 Base FY 2026 FY 2027 OOC 3 3 387.686 823.368 387.686 FY 2027 Total 0.000 FY 2028 FY 2029 To FY 2031 Complete FY 2030 Total 3 5 7 7 7 35 67 823.368 962.243 1,381.225 1,215.921 1,127.893 7,255.800 13,313.599 52.191 - 52.191 80.965 85.436 87.695 89.627 536.866 1,042.243 771.177 0.000 771.177 881.278 1,295.789 1,128.226 1,038.266 6,718.934 12,271.356 Plus CY Advance Procurement ($ in Millions) 109.463 - 52.191 80.965 - 80.965 85.436 87.695 89.627 91.466 445.400 1,042.243 Total Obligation Authority ($ in Millions) 109.463 50.000 439.877 852.142 0.000 852.142 966.714 1,383.484 1,217.853 1,129.732 7,164.334 13,313.599 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 57.106 35.797 63.287 - 63.287 68.806 60.821 194.106 198.168 Continuing Continuing Flyaway Unit Cost ($ in Thousands) - - 113,001.333 181,597.333 - 181,597.333 164,170.200 159,360.571 155,122.571 149,447.286 181,811.000 171,268.776 Gross/Weapon System Unit Cost ($ in Thousands) - - 129,228.667 274,456.000 - 274,456.000 192,448.600 197,317.857 173,703.000 161,127.571 207,308.571 198,710.433 Description: The requirement for the MQ-25 Carrier Based Unmanned Air System (CBUAS), more recently referred to as the MQ-25 Unmanned Carrier Aviation (UCA) System, is defined in a Capability Development Document (CDD) dated 21 July 2017. The MQ-25 program entered the Engineering and Manufacturing Development (EMD) phase of the acquisition process as an Acquisition Category IB program on 14 August 2018. The MQ-25 program provides an unmanned capability to embark on CVNs as part of the Carrier Air Wing (CVW) to conduct aerial refueling as a primary mission. MQ-25 extends CVW mission effectiveness range, and fills the future CVW-tanker gap, mitigating the Strike Fighter shortfall and preserving F/A-18E/F Fatigue Life for its primary missions. As the first carrier-based, group 5 Unmanned Aircraft System (UAS), MQ-25 pioneers the integration of manned and unmanned operations, demonstrates mature complex sea-based Command, Control, Communications, Computers, and Intelligence (C4I) UAS technologies, and paves the way for future multifaceted multi-mission UAS to pace emerging threats. MQ-25 is designed to conduct aerial refueling. MQ-25 will have the ability to refuel all carrier based fixed wing aircraft capable of aerial refueling and pass sensor data to other aircraft, naval vessels, and ground forces. Sensor data is transmitted at appropriate classification levels, to exploitation nodes afloat and ashore (e.g. Distributed Common Ground System - Navy). The MQ-25 system is sustainable onboard an aircraft carrier, as well as ashore, and is designed to minimize the logistics footprint. MQ-25 achieves these capabilities through the use of a carrier-suitable, semi-autonomous, unmanned Air Segment and the Unmanned Carrier Aviation (UCA) Mission Control System (UMCS) that provides CVN infrastructure modifications and hardware to support MQ-25 operations aboard all NIMITZ class carriers (except CVN 68), all delivered and planned FORD class carriers, and operational shore sites. The Government is the Lead Systems Integrator (LSI), providing government-led system of systems integration for the MQ-25 Program. The program coordinates across all segments and with external stakeholders to ensure program activities are synchronized. MQ-25 interfaces with existing ship and land-based command and control systems. The MQ-25 Program of Record is comprised of 76 air vehicles. Of the 76, four are Engineering Development Models (EDMs) and five are System Demonstration Test Articles (SDTAs), all of which are/were incrementally funded using RDT&E funds. The remaining 67 aircraft are funded with Aircraft Procurement, Navy (APN). The FY 2026 spend plan amount for MQ-25 includes $387,686 thousand of discretionary and $100,000 thousand of mandatory (reconciliation) for a total of $487,686 thousand. The mandatory funds are to be utilized with the discretionary funding in the procurement of 3 A/C for the MQ-25 LRIP LOT 1 A/C. The tables in this budget exhibit do not include the $100,000 thousand of mandatory funding skewing the unit cost per aircraft. Aircraft flyaway unit cost is actually $166,150 thousand per a/c vice $113,001 thousand reflected in budget exhibit. LI 0449 - MQ-25 Navy UNCLASSIFIED Page 1 of 13 P-1 Line #17 Volume 1 - 189 === page 240 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 04: Other Aircraft / BSA 1: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 0449 / MQ-25 Program Elements for Code B Items: 0207255N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: P462 Pertinent RDT&E testing milestones: Initial Test and Evaluation: 3Q FY2024 - 4Q FY2029 Initial Operational Test and Evaluation: 2Q FY2029 - 4Q FY2029 Initial Operational Capability: 2Q FY2029 LI 0449 - MQ-25 Navy UNCLASSIFIED Page 2 of 13 P-1 Line #17 Volume 1 - 190 === page 241 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 04: Other Aircraft / BSA 1: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 0449 / MQ-25 Program Elements for Code B Items: 0207255N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: P462 Exhibits Schedule Exhibit Type Title* P-5 1 / MQ-25 P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 97.484 - / 61.979 3 / 387.686 3 / 823.368 - / 0.000 3 / 823.368 - / 97.484 - / 61.979 3 / 387.686 3 / 823.368 - / 0.000 3 / 823.368 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 request supports the procurement of three Low Rate Initial Production (LRIP) MQ-25 aircraft, and the advance procurement of long-lead materials in support of five in LRIP (Lot 3) MQ-25 aircraft. The LRIP contract award is planned for March 2027 and the LRIP Advanced Procurement contract award is planned for January 2027. Additionally, FY2027 will see an increase in funding requirements for obsolescence, the procurement of Airframe Peculiar Ground Support Equipment (PGSE) and Peculiar Training Equipment. Engines and Contractor Furnished Equipment (CFE)/Government Furnished Equipment (GFE) cost elements are to procure specific equipment needed for that year's aircraft buy. GFE includes, but is not limited to, Advanced Networking Tactical System (ANTS), Multifunctional Information Distribution System (MIDS)/Joint Tactical Radio System- (JTRS), Conformal-Controlled Reception Pattern Antenna (C-CRPA), Advanced Digital Antenna Production -Antenna Electronic (ADAP-AE), Wideband SATCOM terminals and Commercial SATCOM service (Skyhook), Electro-Optical/Infrared (EO/IR), Air Refueling Pod (ARS A/ A42R-1), and Airborne Radio Communications (ARC-210). REC Flyaway ECO is required to address design changes and design corrections in order to incorporate these into the production line. NRE supports the activities required to forward fit the LRIP with baseline changes from obsolescence or identified during SDTA+ Flight Test and Production Configuration Audit. Obsolescence supports life-of-type (LOT) procurements for ~30 components across 8-10 subsystems identified as obsolete or at risk of end-of-life (EOL). These components are required for LRIP Lot 2 and must be procured early to avoid redesign, cost growth, and schedule delays. Airframe PGSE is required to establish and maintain intermediate level maintenance capability at operational sites and aboard Aircraft Carriers, Nuclear (CVN), and depot level maintenance capability standup at the designated source of repair facilities for depot operations, and at operational sites. Includes costs for supplier technical data development and delivery, technical publication development, training, support equipment, tools, and other supporting logistics elements. Funding ensures critical capability is in place to support reduction of repair turnaround time and 90 day unreplenished requirements in support of the MQ-25's Mission Capable Aircraft Readiness (MCAR) and Fully Mission Capable Aircraft Readiness (FMCAR) goals. Peculiar Training Equip includes funding for Mission System Trainer (MST) located at Pt. Mugu, CA, which includes costs for Fleet Replacement Squadron (FRS), NAWCAD Simulation Division (SimDiv), and additional hardware. Funding also supports AVP Contract Instructors (CIs), Weapons Systems Trainer (WST), Part Task Trainer (PTT), Deck Operator Trainer (DOT), and courseware. Production Support requirements are for Government and Contractor Support Services (CSS) annualized support of the overarching production program. Production Support requirements are annualized efforts required to provide acquisition support, aircraft configuration management, supportability standup activities, and engineering support for production. Integrated Logistics Support requirements are for the portion originally embedded in "Production Support" that organically provides logistics elements for stand-up activities associated with aircraft production and eventual fleet transition. Publications Tech Data supports the costs required to forward fit the initial LRIP technical publications with baseline changes from obsolescence or identified during SDTA+ Flight Test and Production Configuration Audit. This includes the development and distribution of maintenance repair manuals essential for operation and sustainment of production aircraft. LI 0449 - MQ-25 Navy UNCLASSIFIED Page 3 of 13 P-1 Line #17 Volume 1 - 191 === page 242 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 04: Other Aircraft / BSA 1: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 0449 / MQ-25 Program Elements for Code B Items: 0207255N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: P462 FY2027 Spares will complete the range and depth for 2nd and 3rd MQ-25 deployments. The MQ-25 first deployment consists of three EMD aircraft and is not tied to APN-4 aircraft. Full funding for every end item requesting advance procurement is included in the budget submission. LI 0449 - MQ-25 Navy UNCLASSIFIED Page 4 of 13 P-1 Line #17 Volume 1 - 192 === page 243 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0449 / MQ-25 Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / MQ-25 MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - - Gross/Weapon System Cost ($ in Millions) 97.484 61.979 Less PY Advance Procurement ($ in Millions) 97.484 11.979 Net Procurement (P-1) ($ in Millions) 0.000 50.000 FY 2027 Base FY 2027 OOC 3 3 387.686 823.368 387.686 FY 2027 Total - 3 0.000 823.368 52.191 - 52.191 771.177 0.000 771.177 Plus CY Advance Procurement ($ in Millions) 109.463 - 52.191 80.965 - 80.965 Total Obligation Authority ($ in Millions) 109.463 50.000 439.877 852.142 0.000 852.142 35.797 63.287 - 63.287 129,228.667 274,456.000 - 274,456.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 57.106 Gross/Weapon System Unit Cost ($ in Thousands) - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost 1.1.1) Engines/ Accessories (1) 1.1.2) Airframe/CFE (†) (2) * - - 38.685 - - - - - - 29.216 - - 7.187 102,622.000 - 3 - - 307.866 141,630.667 3 26.526 - - - 424.892 - - - - - 141,630.667 26.526 3 424.892 1.1.3) CFE/Avionics (3) - - 27.320 - - 4.792 - - 6.056 - - 27.243 - - - - - 27.243 1.1.4) GFE/Avionics (4) - - 2.263 - - - - - 1.192 - - 5.682 - - - - - 5.682 - - - - - - - - 15.173 - - 31.348 - - - - - 31.348 - - 97.484 - - 11.979 - - 330.287 - - 515.691 - - - - - 515.691 1.2.1) Tooling - - - - - - - - 7.717 - - - - - - - - - (6) - - - - - - - - 1.000 - - 8.000 - - - - - 8.000 (7) - - - - - - - - - - - 21.101 - - - - - 21.101 1.2.4) Production Transition - - - - - 50.000 - - - - - - - - - - - - Subtotal: Non Recurring Cost - - - - - 50.000 - - 8.717 - - 29.101 - - - - - 29.101 - - 97.484 - - 61.979 - - 339.004 - - 544.792 - - - - - 544.792 1.1.5) REC Flyaway ECO (5) Subtotal: Recurring Cost Non Recurring Cost 1.2.2) NRE 1.2.3) Obsolescence Subtotal: Flyaway Cost Support Cost LI 0449 - MQ-25 Navy UNCLASSIFIED Page 5 of 13 P-1 Line #17 Volume 1 - 193 === page 244 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0449 / MQ-25 Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / MQ-25 MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 2.1) Airframe PGSE (8) 2.2) Peculiar Training Equip (9) 2.3) Production Support (10) 2.4) Integrated Logistics Support (11) 2.5) Publication Tech Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - - - - - - - 14.049 - - 156.429 - - - - - 156.429 - - - - - - - - 2.104 - - 75.630 - - - - - 75.630 - - - - - - - - 21.452 - - 29.426 - - - - - 29.426 - - - - - - - - 8.439 - - 11.658 - - - - - 11.658 - - - - - - - - 2.638 - - 5.433 - - - - - 5.433 Subtotal: Support Cost - - - - - - - - 48.682 - - 278.576 - - - - - 278.576 Gross/Weapon System Cost - - 97.484 - - 823.368 - - Data (†) (12) 61.979 129,228.667 3 387.686 274,456.000 3 0.000 274,456.000 3 823.368 indicates the presence of a P-5a Footnotes: (1) CE 1.1.1 Engines/Accessories: Funding in FY27 provides for engines and accessories for three Low Rate Initial Production Lot 2 aircraft. The apparent cost increase from FY26 to FY27 is attributed to the exclusion of prior Advance Procurement (AP) funding from the FY26 unit cost. This prior AP funding, shown in the 'Prior Years' and FY25 columns, was allocated to support FY26 LRIP procurement. When including this prior AP funding, the total Engines/Accessories funding for FY26 amounts to $23,552 thousand. The increase from Lot 1 Engines (funded with FY22 AP) to Lot 2 Engines (FY26 AP) is due to an updated cost estimate for the purchase of three engines. (2) CE 1.1.2 Airframe/CFE: FY27 funding supports procurement of three Low Rate Initial Production Lot 2 aircraft. The apparent cost increase from FY26 to FY27 is attributed to the exclusion of prior Advance Procurement (AP) funding and mandatory funding from the FY26 unit cost. This prior AP funding, shown in the 'Prior Years' and FY25 columns, was allocated to support FY26 LRIP procurement. When including this prior AP and mandatory funding, the total Airframe/CFE funding for FY26 amounts to $424,697 thousand. (3) CE 1.1.3 CFE/Avionics: FY27 funding supports procurement of CFE Avionics components for three Low Rate Initial Production Lot 2 aircraft. The apparent cost increase from FY26 to FY27 is attributed to the exclusion of prior Advance Procurement (AP) funding from the FY26 unit cost. This prior AP funding, shown in the 'Prior Years' and FY25 columns, was allocated to support FY26 LRIP procurement. When including this prior AP funding, the total CFE/Avionics funding for FY26 amounts to $25,120 thousand. The increase from Lot 1 CFE/Avionics (Funded with FY22 AP & FY24 AP) to Lot 2 CFE/Avionics (FY26 AP) is due to an updated cost estimate. (4) CE 1.1.4 GFE/Avionics: FY27 funding supports GFE for three LRIP Lot 2 aircraft. The cost increase from FY26 to FY27 is a result of FY26 GFE being funded to a lower level than estimated for FY26 (Lot 1) due to available resources being prioritized to cover Airframe/CFE costs. FY27 funding is aligned to fully support GFE requirements for Lot 2. (5) CE 1.1.5 REC Flyaway ECO: Increase from FY26 to FY27 to address additional design changes and design corrections in order to incorporate these into the production line. These efforts were funded to a lower level than estimated in FY26 (Lot 1) due to available resources being prioritized to cover Airframe/CFE costs. If these corrections are identified during Lot 1, they will most likely be deferred until Lot 2 for incorporation. (6) (7) CE 1.2.2 NRE: Increase from FY26 to FY27 is to support the activities required to forward fit the LRIP with baseline changes from obsolescence and early production configuration audit. CE 1.2.3 Obsolescence: Increase from FY26 to FY27 is to support funding for life-of-type (LOT) procurements for ~30 components across 8-10 subsystems identified as obsolete or at risk of end-of-life (EOL). These components are required for LRIP Lot 2 and must be procured early to avoid redesign, cost growth, and schedule delays. LI 0449 - MQ-25 Navy UNCLASSIFIED Page 6 of 13 P-1 Line #17 Volume 1 - 194 === page 245 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 P-1 Line Item Number / Title: 0449 / MQ-25 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / MQ-25 MDAP/MAIS Code: (8) CE 2.1 Airframe PGSE: Increase from FY26 to FY27 is driven by the requirement to buy 10 support equipment bags to include Peculiar SE, Contractor Peculiar SE, and common support SE. These bags will support VUQ-11 Det 2, Det 3, VUQ-11 FDNF, VUQ Home-Guard, the depot, and 5 divert locations. FY27 also starts funding the I-Level Standup capability and includes costs for Ground Based Detect and Avoid capability. Requirements for outfitting costs for Norfolk and the depot are included in FY27. Occupancy Date for Norfolk is 2029 and Depot is 2032. (9) CE 2.2 Peculiar Training Equip: Increase from FY26 to FY27 is to support the Procurements of Mission Systems Trainer (MST) 1 Fleet Replacement Squadron(FRS), MST 2 FRS, AVP Contract Instructors (CI's) CSS - CNAF, WST 2 East, DOT 2 East, CNATT Det PEMA's (Method 4), Landing Gear, Hydraulics, Airframe Maint Trainer (LHAMT) (AM), Flight Controls Maint Trainer (FCMT) (AM), Power Plant Trainer (AD), Avionics Maint Virtual Classroom (AE, AT), Avionics Trainer (AE, AT), MDCS GCS SA/IT Lab (LM), MDCS GCS SA/IT Lab (SimDiv TJ labor), MDCS SA/IT Lab (SimDiv M.Newbury Labor & Add'l Hdwr), MDCS Ancillary Systems (WOLF), Fiber Optics Lab / Wire Connector Repair Lab, Composite Repair Lab, Classroom Electronics, Networks, etc, Follow-on Courseware (AVP and Maint), Updates to existing Ancillary personnel C/W, Logistics PCA Tablets, Contractor Logistics Support - SimDiv, and Maint LOE Support of Instruction. All of these requirements are documented in the latest Cost Analysis Requirement Document (CARD) signed out February 2026. These items are required to train personnel to deploy as early as 2029. (10) CE 2.3 Production Support: Increase from FY26 to FY27 is to support a ramp in Government and Contractor Support Services (CSS) support for the overarching production program. Production Support requirements are annualized efforts required to provide acquisition support, aircraft configuration management, supportability standup activities, and engineering support for production. (11) CE 2.4 Integrated Logistics Support: Increase from FY26 to FY27 to support a ramp in the portion originally embedded in "Production Support" that organically provides logistics elements for stand-up activities associated with aircraft production and eventual fleet transition. (12) CE 2.5 Publication Tech Data: Increase from FY26 to FY27 to support the additional costs required to forward fit the initial LRIP technical publications with baseline changes from obsolescence or identified during SDTA+ Flight Test and Production Configuration Audit. This includes the development and distribution of maintenance repair manuals essential for operation and sustainment of production aircraft. LI 0449 - MQ-25 Navy UNCLASSIFIED Page 7 of 13 P-1 Line #17 Volume 1 - 195 === page 246 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Cost Elements 1.1.2) Airframe/CFE * (†) 1.1.2) Airframe/CFE * (†) O O C P-1 Line Item Number / Title: 0449 / MQ-25 Item Number / Title [DODIC]: 1 / MQ-25 FY Contractor and Location Method/Type or Funding Vehicle 2026 Boeing Co / St. Louis/MO C / FPIF NAVAIR Jul 2026 Mar 2029 3 102,622.000 Y Apr 2024 Boeing Co / St. Louis/MO C / FPIF NAVAIR Mar 2027 Jan 2030 3 141,630.667 Y Apr 2024 2027 (13) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date Advance Procurement CFE - Airframe 2024 Boeing Co. / St. Louis, MO C / TBD NAVAIR Sep 2025 Mar 2029 3 2,395.667 Y CFE - Airframe 2026 Boeing Co. / St. Louis, MO C / TBD NAVAIR Jul 2026 Jan 2030 3 4,356.816 Y CFE - Airframe 2027 Boeing Co. / St. Louis, MO C / TBD NAVAIR Jan 2027 Aug 2030 5 3,687.200 Y CFE - Airframe 2028 Boeing Co. / St. Louis, MO C / TBD NAVAIR Jan 2028 Aug 2031 7 1,041.778 Y CFE - Airframe 2029 Boeing Co. / St. Louis, MO C / TBD NAVAIR Apr 2029 Sep 2032 7 961.429 Y CFE - Airframe 2030 Boeing Co. / St. Louis, MO C / TBD NAVAIR Jun 2030 Dec 2033 7 1,006.867 Y CFE - Airframe 2031 Boeing Co. / St. Louis, MO C / TBD NAVAIR Jun 2031 Dec 2034 7 366.714 Y CFE - Engines 2024 Boeing Co. / St. Louis, MO C / TBD NAVAIR Sep 2025 Mar 2029 3 0.000 Y CFE - Engines 2026 Boeing Co. / St. Louis, MO C / TBD NAVAIR Jul 2026 Jan 2030 3 8,842.000 Y CFE - Engines 2027 Boeing Co. / St. Louis, MO C / TBD NAVAIR Jan 2027 Aug 2030 5 8,790.000 Y CFE - Engines 2028 Boeing Co. / St. Louis, MO C / TBD NAVAIR Jan 2028 Aug 2031 7 9,226.143 Y CFE - Engines 2029 Boeing Co. / St. Louis, MO C / TBD NAVAIR Apr 2029 Sep 2032 7 9,662.143 Y CFE - Engines 2030 Boeing Co. / St. Louis, MO C / TBD NAVAIR Jun 2030 Dec 2033 7 9,838.143 Y CFE - Engines 2031 Boeing Co. / St. Louis, MO C / TBD NAVAIR Jun 2031 Dec 2034 7 11,986.429 N CFE - Avionics 2024 Boeing Co. / St. Louis, MO C / TBD NAVAIR Sep 2025 Mar 2029 3 1,597.333 Y CFE - Avionics 2026 Boeing Co. / St. Louis, MO C / TBD NAVAIR Jul 2026 Jan 2030 3 2,904.667 Y CFE - Avionics 2027 Boeing Co. / St. Louis, MO C / TBD NAVAIR Jan 2027 Aug 2030 5 2,458.200 Y CFE - Avionics 2028 Boeing Co. / St. Louis, MO C / TBD NAVAIR Jan 2028 Aug 2031 7 694.571 Y CFE - Avionics 2029 Boeing Co. / St. Louis, MO C / TBD NAVAIR Apr 2029 Sep 2032 7 641.000 Y CFE - Avionics 2030 Boeing Co. / St. Louis, MO C / TBD NAVAIR Jun 2030 Dec 2033 7 671.286 Y CFE - Avionics 2031 Boeing Co. / St. Louis, MO C / TBD NAVAIR Jun 2031 Dec 2034 7 244.429 Y GFE - Avionics - ANTS 2026 NIWC / San Diego, CA C / TBD NIWC Jun 2026 Jun 2028 3 255.667 Y GFE - Avionics - ANTS 2027 NIWC / San Diego, CA C / TBD NIWC Jun 2027 Jun 2029 5 248.400 Y GFE - Avionics - ANTS 2028 NIWC / San Diego, CA C / TBD NIWC Jun 2028 Jun 2030 7 245.429 Y GFE - Avionics - ANTS 2029 NIWC / San Diego, CA C / TBD NIWC Jun 2029 Jun 2031 7 249.571 Y GFE - Avionics - ANTS 2030 NIWC / San Diego, CA C / TBD NIWC Jun 2030 Jun 2032 7 254.286 Y GFE - Avionics - ANTS 2031 NIWC / San Diego, CA C / TBD NIWC Jun 2031 Jun 2033 7 92.714 Y GFE - Other 2026 BAE Systems / Greenlawn, NY C / TBD NAVAIR Jun 2026 Jun 2028 3 242.333 Y GFE - Other 2027 BAE Systems / Greenlawn, NY C / TBD NAVAIR Jun 2027 Jun 2029 5 235.600 Y GFE - Other 2028 BAE Systems / Greenlawn, NY C / TBD NAVAIR Jun 2028 Jun 2030 7 232.857 Y LI 0449 - MQ-25 Navy UNCLASSIFIED Page 8 of 13 P-1 Line #17 Volume 1 - 196 === page 247 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 (†) Item Number / Title [DODIC]: 1 / MQ-25 FY Contractor and Location Method/Type or Funding Vehicle GFE - Other 2029 BAE Systems / Greenlawn, NY C / TBD NAVAIR Jun 2029 Jun 2031 7 236.714 Y GFE - Other 2030 BAE Systems / Greenlawn, NY C / TBD NAVAIR Jun 2030 Jun 2032 7 241.286 Y GFE - Other 2031 BAE Systems / Greenlawn, NY C / TBD NAVAIR Jun 2031 Dec 2032 7 87.857 Y GFE - Avionics - MIDS/JTRS 2026 VIASAT / Carlsbad, CA C / TBD NAVAIR Jun 2026 Jun 2028 3 795.667 Y GFE - Avionics - MIDS/JTRS 2027 VIASAT / Carlsbad, CA C / TBD NAVAIR Jun 2027 Jun 2029 5 773.600 Y GFE - Avionics - MIDS/JTRS 2028 VIASAT / Carlsbad, CA C / TBD NAVAIR Jun 2028 Jun 2030 7 764.429 Y GFE - Avionics - MIDS/JTRS 2029 VIASAT / Carlsbad, CA C / TBD NAVAIR Jun 2029 Jun 2031 7 777.000 Y GFE - Avionics - MIDS/JTRS 2030 VIASAT / Carlsbad, CA C / TBD NAVAIR Jun 2030 Jun 2032 7 792.000 Y GFE - Avionics - MIDS/JTRS 2031 VIASAT / Carlsbad, CA C / TBD NAVAIR Jun 2031 Jun 2033 7 288.429 Y Cost Elements O O C P-1 Line Item Number / Title: 0449 / MQ-25 Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date indicates the presence of a P-21 Footnotes: (13) Obsolescence redesign impact production baseline to ensure conformance and system capability prior to production delivery. Air vehicle deliveries include additional duration based on EMD aircraft build performance; additionally, low procurement quantities limit contractor incentives to reduce build staffing/support, which slows and lengthens build times below. LI 0449 - MQ-25 Navy UNCLASSIFIED Page 9 of 13 P-1 Line #17 Volume 1 - 197 === page 248 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0449 / MQ-25 Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.2) Airframe/CFE * PROC QTY Item Number / Title [DODIC]: 1 / MQ-25 Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (2) 1 2026 NAVY 3 0 3 1 2027 NAVY 3 0 3 A O C T LI 0449 - MQ-25 Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #17 - - - - - - - 3 A - - - - - - - 3 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 198 === page 249 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0449 / MQ-25 Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.2) Airframe/CFE * PROC QTY Item Number / Title [DODIC]: 1 / MQ-25 Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (2) 1 2026 NAVY 3 0 3 - - - - - - - - - - - - - - - - - 1 2027 NAVY 3 0 3 - - - - - - - - - - - - - - - - - O C T LI 0449 - MQ-25 Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #17 1 M A R A P R - - - - - - - - M A Y J U N J U L 1 A U G - 1 - 3 S E P Volume 1 - 199 === page 250 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0449 / MQ-25 Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.2) Airframe/CFE * PROC QTY Item Number / Title [DODIC]: 1 / MQ-25 Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (2) 1 2026 NAVY 3 2 1 - 1 2027 NAVY 3 0 3 O C T LI 0449 - MQ-25 Navy 1 0 N O V D E C 1 J A N F E B 1 M A R A P R M A Y 1 J U N 0 J U L A U G UNCLASSIFIED Page 12 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 200 === page 251 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 P-1 Line Item Number / Title: 0449 / MQ-25 Item Number / Title [DODIC]: 1 / MQ-25 Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Boeing Co - St. Louis/MO MSR For 2027 1-8-5 For 2027 MAX For 2027 TBD ALT Prior to Oct 1 18 ALT After Oct 1 Reorder Manufacturing PLT 10 32 Total After Oct 1 ALT Prior to Oct 1 42 30 ALT After Oct 1 Manufacturing PLT 6 Total After Oct 1 24 30 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0449 - MQ-25 Navy UNCLASSIFIED Page 13 of 13 P-1 Line #17 Volume 1 - 201 === page 252 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 202 === page 253 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 04: Other Aircraft / BSA 1: Other Aircraft P-1 Line Item Number / Title: 0449 / MQ-25 Program Elements for Code B Items: 0207255N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: P462 Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Gross/Weapon System Cost ($ in Millions) 109.463 - 52.191 80.965 - 80.965 85.436 87.695 89.627 91.466 445.400 1,042.243 Net Procurement (P-1) ($ in Millions) 109.463 - 52.191 80.965 - 80.965 85.436 87.695 89.627 91.466 445.400 1,042.243 Total Obligation Authority ($ in Millions) 109.463 - 52.191 80.965 - 80.965 85.436 87.695 89.627 91.466 445.400 1,042.243 Description: The MQ-25 program provides an unmanned capability to embark on CVNs as part of the Carrier Air Wing (CVW) to conduct aerial refueling as a primary mission. MQ-25 extends the CVW mission effectiveness range, and fills the future CVW-tanker gap, mitigating Strike Fighter shortfall and preserving F/A-18E/F Fatigue Life for its primary missions. As the first carrier-based, group 5 Unmanned Aircraft System (UAS), MQ-25 pioneers the integration of manned and unmanned operations, demonstrates mature complex sea-based Command, Control, Communications, Computers, and Intelligence (C4I) UAS technologies, and paves the way for future multifaceted multi-mission UAS to pace emerging threats. MQ-25 is designed to conduct aerial refueling. MQ-25 will have the ability to refuel all carrier based fixed wing aircraft and pass sensor data to other aircraft, naval vessels, and ground forces. Sensor data is transmitted at appropriate classification levels, to exploitation nodes afloat and ashore (e.g. Distributed Common Ground System - Navy). The MQ-25 system is sustainable onboard an aircraft carrier, as well as ashore, and is designed to minimize the logistics footprint. MQ-25 achieves these capabilities through the use of a carrier-suitable, semi-autonomous, unmanned Air Segment and the Unmanned Carrier Aviation (UCA) Mission Control System (UMCS) that provides CVN infrastructure modifications and hardware to support MQ-25 operations aboard all NIMITZ class carriers (except CVN 68), all delivered and planned FORD class carriers, and operational shore sites. The Government is the Lead Systems Integrator (LSI), providing government-led system of systems integration for the MQ-25 Program. The program coordinates across all segments and with external stakeholders to ensure program activities are synchronized. MQ-25 interfaces with existing ship and land-based command and control systems. The tentative items planned to support the Advanced Acquisition Contracts (AAC) efforts include but are not limited to; landing gear and components, engine and engine nozzles, skins, hook keels, hand forgings, fuel and hydraulic pumps, inner wing fold fitting, inner wing pylon post, wing fold and REFCAS, hand forgings wing root fitting, Vehicle Management Systems Computer (VMSC), Stores Control Unit (SCU), pylon hook, tail actuators, generators, raw materials such as titanium, assorted mission systems component, Advanced Networking Tactical System (ANTS), Multifunctional Information Distribution System (MIDS)/Joint Tactical Radio System- (JTRS), Conformal-Controlled Reception Pattern Antenna (C-CRPA), and Advanced Digital Antenna Production -Antenna Electronic (ADAP-AE). LI 0449 - MQ-25 Navy UNCLASSIFIED Page 1 of 4 P-1 Line #18 Volume 1 - 203 === page 254 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 04: Other Aircraft / BSA 1: Other Aircraft P-1 Line Item Number / Title: 0449 / MQ-25 Program Elements for Code B Items: 0207255N Other Related Program Elements: N/A Line Item MDAP/MAIS Code: P462 Exhibits Schedule Exhibit Type Title* ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-10 1 / MQ-25 - / 109.463 - / - 3 / 52.191 3 / 80.965 - / - 3 / 80.965 P-40 Total Gross/Weapon System Cost - / 109.463 - / - 3 / 52.191 3 / 80.965 - / - 3 / 80.965 *Title represents the P-10 Title for Advance Procurement. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 requests Advance Procurement to support long lead requirements for 5 Low Rate Initial Production (LRIP) aircraft in FY 2028. The Advanced Acquisition Contracts (AAC) award is planned for January 2027. Procurement of long-lead items is determined based upon need dates for materials/components incorporation into the production line build sequence. AP is estimated at 15% of the air vehicle Unit Cost, less Contractor System Engineering and Program Management (SEPM). LI 0449 - MQ-25 Navy UNCLASSIFIED Page 2 of 4 P-1 Line #18 Volume 1 - 204 === page 255 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Navy P-1 Line Item Number / Title: 0449 / MQ-25 Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 First System (2027) Award Date: January 2027 First System (2027) Completion Date: August 2030 MQ-25 Production Leadtime P-5 Number / Title: 1 / MQ-25 Interval Between Systems: 0 Months Prior Years (Months) FY 2025 (Each) When Required Prior Years (Months) FY 2026 (Each) Quantity Cost Elements Date: April 2026 FY 2025 ($ M) FY 2027 (Each) (Each) 3 FY 2026 ($ M) 3 FY 2027 ($ M) ($ M) CFE CFE - Airframe (†) 0 36.403 - 13.070 18.436 CFE - Engines (†) 0 38.685 - 26.526 43.950 CFE - Avionics (†) 0 32.112 - 8.714 12.291 107.200 - 48.310 74.677 0 0.447 - 0.767 1.242 0 0.424 - 0.727 1.178 0 1.392 - 2.387 3.868 2.263 - 3.881 6.288 109.463 - 52.191 80.965 Total: CFE GFE GFE - Avionics - ANTS GFE - Other (†) (†) GFE - Avionics - MIDS/JTRS (†) Total: GFE Total Advance Procurement/Obligation Authority LI 0449 - MQ-25 Navy UNCLASSIFIED Page 3 of 4 P-1 Line #18 Volume 1 - 205 === page 256 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 P-1 Line Item Number / Title: 0449 / MQ-25 Date: April 2026 P-5 Number / Title: 1 / MQ-25 FY 2027 Cost Elements Production Leadtime QPA Unit Cost (Months) (Each) ($ K) Contract Forecast Date 2027 Qty For FY (Each) Total Cost Request ($ M) CFE CFE - Airframe (†) 0 37 3,687.200 Jan 2027 5 18.436 CFE - Engines (†) 0 37 8,790.000 Jan 2027 5 43.950 CFE - Avionics (†) 0 37 2,458.200 Jan 2027 5 12.291 Total: CFE 74.677 GFE GFE - Avionics - ANTS GFE - Other (†) (†) GFE - Avionics - MIDS/JTRS (†) 0 24 248.400 Jun 2027 5 1.242 0 24 235.600 Jun 2027 5 1.178 0 24 773.600 Jun 2027 5 3.868 Total: GFE 6.288 Total Advance Procurement/Obligation Authority 80.965 Description: The MQ-25 Advance Procurement (AP) funding will be used to procure long lead CFE and GFE materials to support the AAC efforts, which include but are not limited to; landing gear and components, engine and engine nozzles, skins, hook keels, hand forgings, fuel and hydraulic pumps, inner wing fold fitting, inner wing pylon post, wing fold and Rotary Electromechanical Flight Control Actuation System (REFCAS), hand forgings wing root fitting, Vehicle Management Systems Computer (VMSC), Stores Control Unit (SCU), pylon hook, tail actuators, generators, raw materials such as titanium, assorted mission systems component, Advanced Networking Tactical System (ANTS), Multifunctional Information Distribution System (MIDS)/Joint Tactical Radio System- (JTRS), Conformal-Controlled Reception Pattern Antenna (CCRPA), and Advanced Digital Antenna Production -Antenna Electronic (ADAP-AE). (†) indicates the presence of Contract Data presented in the associated P-5 Item's P-5a exhibit. LI 0449 - MQ-25 Navy UNCLASSIFIED Page 4 of 4 P-1 Line #18 Volume 1 - 206 === page 257 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 04: Other Aircraft / BSA 1: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0452 / Marine Group 5 UAS Program Elements for Code B Items: 0207257N Other Related Program Elements: 0603128N Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 18 463.040 463.040 463.040 FY 2025 FY 2026 - - 19.081 15.162 - - 19.081 15.162 - - 19.081 15.162 FY 2027 Base FY 2027 OOC 5 118.600 118.600 118.600 FY 2027 Total - 5 0.000 118.600 - - 0.000 118.600 - - 0.000 118.600 To FY 2031 Complete FY 2028 FY 2029 FY 2030 - - - - - 23 0.000 0.000 0.000 0.000 - 615.883 - - - - - 0.000 0.000 0.000 0.000 - - - - - - 0.000 0.000 0.000 0.000 - Total 615.883 615.883 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 39.379 - - - - - - 39.379 Flyaway Unit Cost ($ in Thousands) 17,952.778 - - - 23,682.000 - - 23,682.000 - - - - - - 19,433.043 Gross/Weapon System Unit Cost ($ in Thousands) 25,724.444 - - 23,720.000 - 23,720.000 - - - - - 26,777.522 Description: The Medium Altitude Long Endurance (MALE) program of record originated from the Marine Air Ground Task Force (MAGTF) Unmanned Aircraft System (UAS) Expeditionary (MUX) program to address capability requirements identified in the October 2016 MUX ICD and to meet the National Defense Strategy objectives through USMC Force Design Requirements by enabling operations inside of an adversary's weapons engagement zone. MALE, the first element of the MUX Family of Systems (FoS) employs a Block 5 MQ-9A airframe. The MQ-9A system is being re-purposed to provide persistent long-range stand-off multi-sensor reconnaissance, surveillance and targeting as well as airborne network extension and data relay of Command, Control, and Communications (C3) capabilities to MAGTF Stand-In-Forces (SIF) such as the Marine Littoral Regiment. Additionally, the MALE platform capabilities will enhance the multi-domain awareness and survivability of Joint Task Forces, consisting of distributed naval forces, and provide a critical node in area of operations kill webs during expeditionary, Joint and Combined Operations. The first production lot, consisting of eight (8) aircraft, was procured in FY22 through a U.S. Air Force (USAF) contract, with all aircraft successfully delivered. Additionally, a second lot of ten (10) aircraft was transferred from previously procured USAF production inventory, with deliveries completed in FY25. The request of five (5) additional MQ-9A Air Vehicles in FY27 will increase tactical flexibility as well as aircraft availability. LI 0452 - Marine Group 5 UAS Navy UNCLASSIFIED Page 1 of 8 P-1 Line #19 Volume 1 - 207 === page 258 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 04: Other Aircraft / BSA 1: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0452 / Marine Group 5 UAS Program Elements for Code B Items: 0207257N Other Related Program Elements: 0603128N Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Marine Group 5 UAS P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 18 / 463.040 - / 19.081 - / 15.162 5 / 118.600 - / 0.000 5 / 118.600 18 / 463.040 - / 19.081 - / 15.162 5 / 118.600 - / 0.000 5 / 118.600 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The Marine Corps requires five additional MUX MALE MQ 9A aircraft to meet updated operational demand. Current inventory no longer meets sustained Reconnaissance, Surveillance, Target Acquisition (RSTA) and maritime domain awareness requirements identified in revised force employment projections. Additional aircraft provide required capacity and resilience for Marine Expeditionary Force (MEF) level littoral sensing and data distribution in support of competition, deterrence, and conflict operations. LI 0452 - Marine Group 5 UAS Navy UNCLASSIFIED Page 2 of 8 P-1 Line #19 Volume 1 - 208 === page 259 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0452 / Marine Group 5 UAS Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Marine Group 5 UAS MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 18 Gross/Weapon System Cost ($ in Millions) 463.040 Less PY Advance Procurement ($ in Millions) - 19.081 15.162 - Net Procurement (P-1) ($ in Millions) 463.040 Plus CY Advance Procurement ($ in Millions) - - 19.081 15.162 - Total Obligation Authority ($ in Millions) 463.040 FY 2027 Base - - - 19.081 15.162 FY 2027 OOC 5 FY 2027 Total - 118.600 5 0.000 - 118.600 - 118.600 - 0.000 - 118.600 - 118.600 - 0.000 118.600 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) 39.379 - - - 25,724.444 - - 23,720.000 - - 23,720.000 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost (†) 1.1.1) Airframe/CFE 18 153.210 - - - - - - - - 18.346 - - - - - - - - (2) - - 36.148 - - - - - - - 1.1.4) Rec Flyaway ECO - - 6.798 - - - - - - Subtotal: Recurring Cost - - 214.502 - - - - - 1.2.1) Ancillary Equip - - 108.648 - - 1.900 - Subtotal: Non Recurring Cost - - 108.648 - - 1.900 - - - 323.150 - - 1.900 2.1) Airframe PGSE - - 24.935 - - 2.2) Pec Trng Eq - - 64.113 - - 2.3) Pubs/Tech Equipment Data - - 7.225 - (3) - - 24.688 - - - 18.929 - (1) 1.1.2) Payload/Mission System CFE 1.1.3) GFE Electronics 8,511.667 20,000.000 5 100.000 - - - - - - - - - - - 18.410 - - - - - 18.410 - - - - - - - - - - - - - - - - - - 3.500 - - - - - - - - - - 3.500 - - - - - - - - - - - 3.500 - - - - - - - 0.246 - - 1.000 - - - - - - - - - 2.863 - - 4.287 - - - - - - - - - - - - - 0.665 - - - - - - - - - - 5.706 - - 2.476 - - 0.090 - - - - - 0.090 - 8.366 - - 3.234 - - 0.100 - - - - - 0.100 118.410 20,000.000 5 100.000 118.410 Non Recurring Cost Subtotal: Flyaway Cost 118.410 118.410 Support Cost 2.4) Other ILS 2.5) Prod Eng Supt (4) LI 0452 - Marine Group 5 UAS Navy UNCLASSIFIED Page 3 of 8 P-1 Line #19 Volume 1 - 209 === page 260 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0452 / Marine Group 5 UAS Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Marine Group 5 UAS MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Subtotal: Support Cost Gross/Weapon System Cost (†) Unit Cost ($ K) Qty (Each) 25,724.444 FY 2025 Total Cost ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) - 139.890 - - 17.181 - - 11.662 18 463.040 - - 19.081 - - 15.162 Unit Cost ($ K) 23,720.000 FY 2027 OOC Total Cost Qty (Each) ($ M) 5 Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) 0.190 - - - 118.600 - - 0.000 23,720.000 Total Cost Qty (Each) ($ M) - 0.190 5 118.600 indicates the presence of a P-5a Footnotes: (1) FY 2026 to FY 2027 Airframe/CFE increased due to procurement of five (5) Aircraft. The Airframe CFE consists of system-level components associated with the airframe, propulsion, and vehicle subsystems components. Airframe unit cost pricing is based on the established USAF contract pricing factors, which account for quantity price curves. (2) FY 2026 to FY 2027 increased due to GFE Electronics associated with the procurement of five (5) Airframe. GFE Electronics consists of system level components associated with Multispectral Targeting System (MTS) capabilities and subsystem components. (3) FY 2026 to FY 2027 Other ILS decrease is due to ramping down of the transition to initial Organic standup support and delivery of logistics product elements. Other ILS consists of government support associated with the five (5) Aircraft to include transportation of Government Furnished Property (GFP) and Government Furnished Equipment (GFE). (4) FY 2026 to FY 2027 Production Engineering Support decrease is due to prior years Airframes being delivered along with GFE. The current cost is in support of overall program management of the five (5) Aircraft being procured. LI 0452 - Marine Group 5 UAS Navy UNCLASSIFIED Page 4 of 8 P-1 Line #19 Volume 1 - 210 === page 261 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Cost Elements O O C (†) 1.1.1) Airframe/CFE (†) FY 2027 Contractor and Location General Atomics Aeronautical (5) / Poway, CA 92064 P-1 Line Item Number / Title: 0452 / Marine Group 5 UAS Method/Type or Funding Vehicle SS / IDDQ Location of PCO Wright Patterson Airforce Base Item Number / Title [DODIC]: 1 / Marine Group 5 UAS Award Date Date of First Delivery Jun 2027 Dec 2028 Qty (Each) 5 Specs Date Unit Cost Avail Revision Now? Available ($ K) RFP Issue Date 20,000.000 Dec 2026 N Dec 2026 indicates the presence of a P-21 Footnotes: (5) The Minimum Sustainment Rate (MSR) is comprised of five (5) USMC MQ9 Air Vehicles along with FMS and USAF orders to reach the MSR. LI 0452 - Marine Group 5 UAS Navy UNCLASSIFIED Page 5 of 8 P-1 Line #19 Volume 1 - 211 === page 262 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0452 / Marine Group 5 UAS Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / Marine Group 5 UAS Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT B A L A N C E Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 18 1 2027 NAVY 5 0 LI 0452 - Marine Group 5 UAS Navy 5 A J U N J U L A U G UNCLASSIFIED Page 6 of 8 S E P O C T N O V D E C J A N F E B P-1 Line #19 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 212 5 === page 263 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0452 / Marine Group 5 UAS Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / Marine Group 5 UAS Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R Calendar Year 2030 M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 18 1 2027 NAVY 5 0 5 O C T LI 0452 - Marine Group 5 UAS Navy N O V 1 D E C 1 J A N 1 F E B 1 M A R 1 A P R 0 UNCLASSIFIED Page 7 of 8 P-1 Line #19 Volume 1 - 213 === page 264 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0452 / Marine Group 5 UAS Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Item Number / Title [DODIC]: 1 / Marine Group 5 UAS Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 16 20 24 1 General Atomics Aeronautical 92064 (5) - Poway, CA ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 7 14 Total After Oct 1 ALT Prior to Oct 1 21 ALT After Oct 1 0 Manufacturing PLT 8 Total After Oct 1 18 26 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (5) The Minimum Sustainment Rate (MSR) is comprised of five (5) USMC MQ9 Air Vehicles along with FMS and USAF orders to reach the MSR. LI 0452 - Marine Group 5 UAS Navy UNCLASSIFIED Page 8 of 8 P-1 Line #19 Volume 1 - 214 === page 265 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 04: Other Aircraft / BSA 1: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0465 / Other Support Aircraft Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 10 141.346 141.346 141.346 FY 2027 Base FY 2027 OOC FY 2027 Total 1 10 - 10 7 19.812 204.476 204.476 143.133 FY 2026 0.000 - - 0.000 19.812 - - 0.000 19.812 204.476 204.476 0.000 0.000 0.000 204.476 204.476 FY 2028 143.133 143.133 To FY 2031 Complete FY 2029 FY 2030 - - - - 28 0.000 0.000 0.000 - 508.767 - - - - 0.000 0.000 0.000 - - - - - 0.000 0.000 0.000 - Total 508.767 508.767 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 3.409 16.584 - 16.584 11.608 - - - - 31.601 Flyaway Unit Cost ($ in Dollars) 13,120K - - 19,554K 20,260K - 20,260K 20,169K - - - - 17,662K Gross/Weapon System Unit Cost ($ in Dollars) 14,135K - 19,812K 20,448K - 20,448K 20,448K - - - - 18,170K Description: The U.S. Marine Corps (USMC) UC-12W Operational Support Airlift aircraft is a FAA type-certified modern commercial cargo/passenger transport aircraft that will replace the USMC UC-12F/M and UC-35 C/D aircraft in performing Operational Support Airlift (OSA) missions. The OSA mission provides transportation for high priority passengers and cargo with time, place or mission sensitive requirements. The aircraft will be capable of operating out of short, unimproved airfields; carry a minimum of nine passengers or light cargo; or carry a combination of passengers and cargo. The aircraft will be delivered with the following military unique systems: Ultra High Frequency (UHF) radio, Tactical Air Navigation (TACAN) radio, Identification Friend or Foe/Selective Identification Feature (IFF/SIF), and Aircraft Survivability Equipment (ASE). In "Prior Years", in addition to the ten aircraft shown above, two Other Support Aircraft (UC-12W) were procured for the USMC Reserves using FY07 & FY08 National Guard & Reserve Equipment Account (NGREA) funding. In July 2023, the USMC increased the UC-12W Program of Record (POR) quantity from 12 to 30 aircraft to support operational requirement. LI 0465 - Other Support Aircraft Navy UNCLASSIFIED Page 1 of 9 P-1 Line #20 Volume 1 - 215 === page 266 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N: Aircraft Procurement, Navy / BA 04: Other Aircraft / BSA 1: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0465 / Other Support Aircraft Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 1 / Other Support Aircraft P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 10 / 141.346 - / 0.000 1 / 19.812 10 / 204.476 - / 0.000 10 / 204.476 10 / 141.346 - / 0.000 1 / 19.812 10 / 204.476 - / 0.000 10 / 204.476 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY27 procures ten (10) Other Support Aircraft UC-12W, including airframe CFE, GFE, and support funding. LI 0465 - Other Support Aircraft Navy UNCLASSIFIED Page 2 of 9 P-1 Line #20 Volume 1 - 216 === page 267 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0465 / Other Support Aircraft Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Other Support Aircraft MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 10 Gross/Weapon System Cost ($ in Millions) 141.346 Less PY Advance Procurement ($ in Millions) 0.000 - Net Procurement (P-1) ($ in Millions) 141.346 Plus CY Advance Procurement ($ in Millions) 141.346 FY 2027 OOC 1 10 19.812 204.476 - - 0.000 19.812 - Total Obligation Authority ($ in Millions) FY 2027 Base - - - 0.000 19.812 FY 2027 Total - 10 0.000 - 204.476 - 204.476 - 0.000 - 204.476 - 204.476 0.000 204.476 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Dollars) 14,135K - 3.409 16.584 - 16.584 - 19,812K 20,448K - 20,448K Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost (†) 1.1.1) Airframe/CFE 10 124.557 - - - - - 0.273 - - - - - - - - (2) - - 4.145 - - - - - 0.903 - - 1.1.4) Other GFE - - 0.070 - - - - - - - - - Subtotal: Recurring Cost - - 129.045 - - - - - 19.554 - - 1.2.1) Non-Recur Cost - - 0.196 - - - - - - - - 1.2.2) Ancillary Equip - - 1.954 - - - - - - - - Subtotal: Non Recurring Cost - - 2.150 - - - - - - - - - - 131.195 - - - - - 19.554 - - 202.596 - - 0.978 - - - - - 0.103 - - - - 5.851 - - - - - 0.155 - - 2.3) Pub/Tech Eq - - 0.172 - - - - - - - 2.4) Pec Trng Eq - - 0.173 - - - - - - - - 1.224 - - - - - - - 0.305 - - - - - (1) 1.1.2) CFE Electronics 1.1.3) GFE Electronics 12,456K 18,651K 1 18.651 19,383K 10 193.834 - - - - - - - - - - 8.762 - - - - - 8.762 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 202.596 0.449 - - - - - 0.449 0.660 - - - - - 0.660 - - - - - - - - - - - - - - - - - - - - 0.574 - - - - - 0.574 - - - 0.097 - - - - - 0.097 202.596 19,383K 10 193.834 202.596 Non Recurring Cost Subtotal: Flyaway Cost - Support Cost 2.1) Other ILS (3) 2.2) Prod Eng Supt (4) 2.5) Avionics PGSE 2.6) Engine PGSE (5) (6) LI 0465 - Other Support Aircraft Navy UNCLASSIFIED Page 3 of 9 P-1 Line #20 Volume 1 - 217 === page 268 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Navy P-1 Line Item Number / Title: 0465 / Other Support Aircraft Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: 1 / Other Support Aircraft MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements 2.7) Airframe PGSE (7) Subtotal: Support Cost Gross/Weapon System Cost (†) Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 1.448 - - - - - - - - 0.100 - - - - - 0.100 - - 10.151 - - - - - 0.258 - - 1.880 - - - - - 1.880 10 141.346 - - 0.000 10 204.476 - - 0.000 10 204.476 14,135K 19,812K 1 19.812 20,448K 20,448K indicates the presence of a P-5a Footnotes: (1) (2) (3) (4) (5) (6) (7) 1.1.1: FY27 increase due to the procurement of UC-12W+ production aircraft requirement (qty 10). 1.1.3: FY27 increase due to GFE Electronic requirements for the UC-12W+ production aircraft requirement. 2.1: FY27 increase is due to additional logistics support required for the production UC-12W+ aircraft. 2.2: FY27 increase is due to additional product engineering support required for the production UC-12W+ aircraft. 2.5: FY27 increase is due to initial procurement of Avionics PGSE for the production UC-12W+ aircraft. 2.6: FY27 increase is due to initial procurement of Engine PGSE for the production UC-12W+ aircraft. 2.7: FY27 increase is due to initial procurement of Airframe PGSE for the production UC-12W+ aircraft. LI 0465 - Other Support Aircraft Navy UNCLASSIFIED Page 4 of 9 P-1 Line #20 Volume 1 - 218 === page 269 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Navy Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Cost Elements O O C (†) 1.1.1) Airframe/CFE (†) 1.1.1) Airframe/CFE (†) 1.1.1) Airframe/CFE (†) P-1 Line Item Number / Title: 0465 / Other Support Aircraft Method/Type or Funding Vehicle Item Number / Title [DODIC]: 1 / Other Support Aircraft Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2024 TEXTRON AVIATION INC / WICHITA KS C / FFP Wichita, KS Feb 2025 Dec 2027 3 17,513K Y 2026 TEXTRON AVIATION INC / WICHITA KS C / FFP Wichita, KS Sep 2026 Dec 2028 1 18,651K Y 2027 TEXTRON AVIATION INC / WICHITA KS C / FFP Wichita, KS Mar 2027 Jun 2029 10 19,383K Y (Each) RFP Issue Date indicates the presence of a P-21 LI 0465 - Other Support Aircraft Navy UNCLASSIFIED Page 5 of 9 P-1 Line #20 Volume 1 - 219 === page 270 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0465 / Other Support Aircraft Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / Other Support Aircraft Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 7 1 2024 NAVY 3 0 3 1 2026 NAVY 1 0 1 1 2027 NAVY 10 0 10 A - - - - - - - - - - - - - - - - - - - 3 A - 1 10 O C T LI 0465 - Other Support Aircraft Navy - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 9 S E P O C T N O V D E C J A N F E B P-1 Line #20 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 220 === page 271 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0465 / Other Support Aircraft Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / Other Support Aircraft Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 7 1 2024 NAVY 3 0 3 - - - - - - - - - - - - - - 1 2026 NAVY 1 0 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 1 2027 NAVY 10 0 10 A - - - - - - - - - - - - - - - - - - - 10 O C T LI 0465 - Other Support Aircraft Navy N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 9 S E P O C T N O V 1 D E C 1 J A N 1 F E B P-1 Line #20 0 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 221 === page 272 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0465 / Other Support Aircraft Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1.1.1) Airframe/CFE PROC QTY Item Number / Title [DODIC]: 1 / Other Support Aircraft Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 7 1 2024 NAVY 3 3 0 1 2026 NAVY 1 0 1 - - 0 1 2027 NAVY 10 0 10 - - O C T LI 0465 - Other Support Aircraft Navy N O V 1 0 D E C J A N F E B M A R A P R M A Y 1 J U N 1 J U L 1 A U G UNCLASSIFIED Page 8 of 9 1 S E P 1 O C T 1 N O V 1 D E C 1 J A N 1 F E B P-1 Line #20 1 M A R 0 A P R M A Y J U N J U L A U G S E P Volume 1 - 222 === page 273 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Navy P-1 Line Item Number / Title: 0465 / Other Support Aircraft Appropriation / Budget Activity / Budget Sub Activity: 1506N / 04 / 1 Item Number / Title [DODIC]: 1 / Other Support Aircraft Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 20 75 180 1 TEXTRON AVIATION INC WICHITA KS ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 6 28 Total After Oct 1 ALT Prior to Oct 1 34 ALT After Oct 1 0 Manufacturing PLT 6 Total After Oct 1 27 33 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0465 - Other Support Aircraft Navy UNCLASSIFIED Page 9 of 9 P-1 Line #20 Volume 1 - 223 === page 274 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 224