=== page 1 === ARMY WORKING CAPITAL FUND FISCAL YEAR 2027 BUDGET ESTIMATES SUBMITTED TO CONGRESS APRIL 2026 === page 2 === === page 3 === Table of Contents SUMMARY DETAIL Table of Budgetary Resources 1 Key Metrics 2 ARMY OVERVIEW Background 3 AWCF Activity Groups 7 Budget Highlights 8 Fund Balance with Treasury 13 Capital Budget 19 SUPPLY MANAGEMENT OPERATING BUDGET Introduction 20 Budget Highlights 26 Appropriations 34 Exhibits 35 INDUSTRIAL OPERATIONS OPERATING BUDGET Introduction 47 Budget Highlights 57 Appropriations 64 for Certain Depots and Exhibits The estimated cost of this report for the Department of War (DOW) is approximately $75,724 for Fiscal Year (FY) 2026. This includes $2,580 in expenses and $73,144 in DOW All photographs in this document were obtained from official United States DOW web sites Includes FY 2026 Consolidated Appropriations Act, 2026 (Public Law 119-75) Minimum Capital Investment Arsenals Defense Logistics Agency receives property turn in from Chinook (DOW photo by Dorie Heyer) 65 66 CAPITAL BUDGET Introduction 86 Supply Management Exhibits 88 Industrial Operations Exhibits 91 === page 4 === === page 5 === ARMY WORKING CAPITAL FUND Fiscal Year (FY) 2027 Budget Estimates Summary of Budget Activity ($ in Thousands) Army Working Capital Fund Total Contract Authority (Includes CIP) Operating Contract Authority Supply Management Industrial Operations Capital Investment Program (CIP) Supply Management Industrial Operations Total Spending Authority from Offsetting Collections Supply Management Industrial Operations Direct Appropriations, Total Supply Management Industrial Operations* Total Budget Authority Supply Management Industrial Operations FY 2025 FY 2026 FY 2027 8,519,503 7,348,245 7,528,842 8,408,188 8,408,188 7,193,751 7,193,751 7,420,942 7,420,942 0 0 0 111,315 10,660 154,494 15,466 107,900 23,593 100,655 139,028 84,307 4,827,078 4,560,715 4,296,035 0 0 0 4,827,078 4,560,715 4,296,035 145,411 3,635 125,589 0 20,563 0 141,776 125,589 20,563 13,491,992 8,422,483 12,034,549 7,209,217 11,845,440 7,444,535 5,069,509 4,825,332 4,400,905 *FY 2025 Industrial Operations Direct Appropriation amount does not include $913K of direct authority received from the sales of scrap materials 1 === page 6 === ARMY WORKING CAPITAL FUND Fiscal Year (FY) 2027 Budget Estimates President's Budget FY 2027 Summary ($ in Thousands) Army Working Capital Fund Total Revenue Supply Management* FY 2025 FY 2026 12,229,627 7,201,868 FY 2027 12,207,298 7,500,010 11,804,655 7,523,123 Industrial Operations 5,027,759 4,707,288 4,281,532 Total Expenses Supply Management 12,020,095 6,983,962 11,960,534 7,240,214 11,616,308 7,172,338 Industrial Operations 5,036,133 4,720,320 4,443,970 Total Recoverable NOR Supply Management -26,222 -150,061 340,416 259,796 277,850 350,785 Industrial Operations 123,839 80,620 -72,935 -77,751 -209,964 -109,960 -203,611 -146,393 -235,897 132,213 93,651 89,504 -178,757 -171,072 -41,953 -114,888 0 0 Total Net Operating Result Adjustments Supply Management Industrial Operations Total Accumulated Operating Result (AOR) Supply Management Industrial Operations -7,685 72,935 0 111,315 10,660 154,494 15,466 107,900 23,593 Industrial Operations 100,655 139,028 84,307 Total Direct Appropriations Supply Management 145,411 3,635 125,589 0 20,563 0 Total Capital Investment Projects Supply Management Industrial Operations 141,776 125,589 20,563 Total Collections Supply Management 11,911,502 7,259,379 12,078,730 7,500,633 11,779,592 7,523,123 Industrial Operations 4,651,951 4,578,096 4,256,469 172 0 0 Total Disbursements Supply Management 12,705,327 7,947,473 12,380,873 7,739,618 11,696,876 7,359,984 Industrial Operations 4,758,349 4,640,668 4,336,892 -495 587 0 2,010,086 1,108,015 1,733,531 1,019,030 1,836,810 1,182,169 901,484 714,501 654,641 587 0 0 1,573,289 1,180,765 1,580,684 1,189,393 1,452,167 1,048,246 Undistributed Undistributed Total End of Period Cash Balance Supply Management Industrial Operations Undistributed Total Cash Lower Operating Limit Supply Management Industrial Operations Total Cash Upper Operating Limit Supply Management 392,524 391,290 403,921 3,861,784 2,943,115 3,869,179 2,951,744 3,382,705 2,496,150 918,669 917,435 886,555 Industrial Operations Personnel Data Army Working Capital Fund FY 2025 Civilian Full Time Equivalents Supply Management Industrial Operations FY 2026 FY 2027 18,505 1,935 17,377 1,746 16,326 1,746 16,570 15,631 14,580 Months of Carryover Army Working Capital Fund Depot Months of Carryover Industrial Operations *Supply Management Total Revenue represents Net Sales 2 FY 2025 FY 2026 6.2 6.2 FY 2027 5.8 5.8 5.6 5.6 === page 7 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Army Overview Background W orking capital funds were established by Congress to more effectively control and account for the cost of programs and work performed in the Department of War (DOW). Under the provisions of Title 10, United States Code (USC), § 2208, the Secretary of War may establish working capital funds to finance inventories of supplies and industrial-type activities that provide common services such as repair, manufacturing, or remanufacturing. Unlike profit-oriented commercial businesses, the revolving fund’s goal is to break even by returning any monetary gains to appropriated fund customers through lower rates or collecting any monetary losses from customers through higher rates. Revolving fund prices are generally stabilized or fixed during the year of execution to protect customers from unforeseen fluctuations that would impact their ability to execute the programs approved by Congress. The basic tenet of the revolving fund structure is to create a customerprovider relationship Command leads equipment divestiture (U.S. Army photo by Sgt. P.S. Bailey Whilden) between military operating units and support organizations. This relationship is designed to make managers of the Army Working Capital Fund (AWCF) and decision-makers at all levels more aware of costs for goods and services. The Army’s revolving fund activities evolved from two separate types of funds. The first type, known as the Stock Fund, procured spare parts in volume to either sell to customers or hold in inventory. The second type, known as the Industrial Fund, provided industrial services to customers, such as depot maintenance, munitions and weapon systems component manufacturing, and ammunition storage. Both types of revolving funds were financed primarily by reimbursements from customer appropriated accounts. The fund’s business activities are currently known as Supply Management and Industrial Operations. 3 === page 8 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Figure 1 illustrates the financial cycle of the AWCF. The process is a continuous loop involving the AWCF and its customer: 1) a customer, using their own internal budget, sends an order through the AWCF, which results in an obligation for the customer; 2) upon receiving the order, the AWCF spends cash to pay for the inventory, services, labor, and supplies to complete the customer order; 3) the AWCF then provides the procured products or services to the customer; 4) following the delivery, the AWCF bills the customer for the goods or services provided; and 5) the customer pays the bill, which generates cash for the AWCF, replenishing its cash balance. Figure 1 - AWCF Cash Process 4 === page 9 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Introduction The Fiscal Year (FY) 2027 AWCF budget supports the Army’s vision to deliver ready, combat-credible forces capable of conducting Joint Force operations across a full range of military contingencies. The AWCF directly enables materiel readiness by resourcing depot maintenance and supply activities essential to sustaining operational capability and warfighter support. Aligned with Army’s Continuous U.S. Army Tank-Automotive Command personnel Transformation efforts, the AWCF is performs vehicle maintenance at Anniston Army striving to optimize sustainment, Depot (U.S. Army photo by Ann Zaniewski) divest legacy equipment, and modernize Industrial Operations. The Army’s efforts are prioritizing agile, datadriven logistics and targeted investments that improve efficiency and responsiveness, while addressing future operational demands. The AWCF’s revolving fund structure reinforces these priorities by providing full cost visibility, budget flexibility, and price stability for supported customers. The structure encourages cost-effectiveness, flexibility, and adaptability to meet changing workload requirements in the year of execution. It helps protect appropriated fund customer accounts from year of execution price fluctuations. The AWCF consists of the Supply Management and Industrial Operations activity groups, with operations spanning across 17 cities and local areas within 14 states. The exact locations are shown in each business activity's portion of the budget. The AWCF activities disbursed approximately $12.7 billion and collected $11.9 billion in FY 2025 to maintain the readiness and sustainability of military equipment. Performance Measures Key financial measures are Net Operating Result (NOR), Accumulated Operating Result (AOR), and unit cost. The NOR represents the difference between revenue and expenses within a fiscal year. The AOR represents the summation of all operating gains or losses since activity group inception, along with any prior period adjustments. Prices and rates are set at a level that brings the accumulated gains and losses to zero over the budget cycle. The unit cost is a metric primarily used in the Supply Management activity group to relate operating costs to each dollar of sales. It is measured by dividing gross operating cost (the sum of total obligations, depreciation expense, and credit) by gross sales. 5 === page 10 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Adjusting the unit cost determines how much obligation authority may be distributed based on sales activity. In addition to the financial measures (NOR, AOR, and unit cost), operational measures assess how well the financial inputs reflected in the AWCF budget support Army strategic goals and operational readiness. Operational measures include productive yield (an indicator of whether direct labor employees can support projected workload) and stock availability (a measure of the ability of AWCF inventory to fill a customer’s requisition). These are identified within each activity group's narrative. Logistics Modernization Program (LMP) The LMP provides a modernized logistics and finance solution that allows the U.S. Army Materiel Command (AMC) to provide world-class logistics readiness to Soldiers. The LMP delivers a fully integrated suite of software and business processes, providing streamlined data for maintenance, repair and overhaul, finance, acquisition, spare parts, and materiel. It is the Army's core logistics Information Technology (IT) initiative, which meets the Army's IT logistics vision of transformation from legacy applications to a modernized logistics enterprise solution. The LMP manages approximately 11.2 million transactions daily and is integrated with more than 55 DOW systems and 260 interfaces, including with Army's other major enterprise resource planning systems, including the Army Enterprise Systems Integration Program, the Global Combat Support System-Army, and the General Fund Enterprise Business Systems. The LMP is currently used by more than 19,000 users at more Refurbished ordinance awaiting distribution at Blue Grass Army Depot (U.S. Army photo by Dori Whipple) than 50 Army and DOW locations worldwide. Enhancements and system changes continue to be applied to LMP to ensure compliance with statutory and regulatory requirements. 6 === page 11 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Activity Groups Supply Management The Supply Management activity group acquires and manages spare and repair parts for sale to its customers, primarily Army operating units. This activity group remains critical to building and sustaining Army readiness in the face of evolving threats and changing operational demands in FY 2027. The Army’s equipment and operational readiness, and the strength to win the Nation’s wars, are directly linked to the availability of spare parts. The Supply Management activity group administers spare parts inventory for Army Managed Items and Non-Army Managed Items (NAMI). The Life Cycle Management Commands assigned to the AMC, manage the Supply Management activity, which consists of four major commodity groups: aviation and missile; communications-electronics; tankautomotive and armament; and NAMI. The continuous modernization of Army formations will drive targeted additions to the supply inventory. With the Army focused on continuous transformation, the demand for technically complex, highvelocity spare parts continues to increase. Industrial Operations The Industrial Operations activity group delivers the Army’s Organic Industrial Base (OIB) capability, supporting depot-level maintenance, repair, recapitalization, and upgrade efforts. In FY 2027, the focus remains on executing the Army’s OIB Modernization Implementation Plan – one of the largest reinvestment efforts in the industrial base in four decades. Industrial Operations encompasses 13 government-owned, government-operated sites, including five hard-iron maintenance depots, three arsenals, two munitions production plants, and three key storage and distribution sites. These installations support other DOW services and all Army Commands by executing maintenance, producing munitions and large-caliber weapons, storing and demilitarizing materiel, and retrograding combat systems. The complex operational environment continues to place tremendous demands on equipment, resulting in higher usage rates than in routine peacetime operations. The Industrial Operations activities play an integral role in resetting equipment as it retrogrades from combat operations. The activity group supports recapitalization, repair, and sustainment efforts that ensure Army equipment remains operationally capable and aligned with mission requirements. The Industrial Operations budget accounts for workload associated with high-demand operating environments, elevated usage rates, and emerging threat response. 7 === page 12 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Budget Highlights Overview The FY 2027 budget represents a business plan that supports Soldier and weapon systems readiness for both peacetime training and overseas operating requirements. The AWCF provides materiel readiness to operating units in support of the Army’s training and modernization objectives, ensuring sustained warfighting capability under evolving strategic conditions. This posture aligns with DOW and Army guidance to drive materiel transformation, enable continuous readiness, and ensure fiscal and industrial agility. The predictability of resources is critical for accurately forecasting and executing workload. Operational tempo assumptions help inform budget formulation; however, changes in mission demands or funding levels may significantly alter AWCF execution forecasts. To mitigate these risks, both Supply Management and Industrial Operations activity groups must remain agile – adjusting to evolving workload requirements while managing cost pressures to ensure the Army retains materiel readiness at an acceptable cost to the taxpayer. In FY 2027, a unit cost ratio set to 0.99 will fully replenish the projected sales and balance future readiness with forecasted cash affordability. Potential readiness impacts will be monitored and can be addressed with variability target to respond rapidly to unexpected variances in costs or customer demands during the year of execution. The Industrial Operations activity group budget request includes a mix of permanent, temporary, and term-appointment employees, in addition to contract labor, to better respond to unanticipated increases or decreases in new orders. 8 === page 13 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Personnel In FY 2027, there will be a reduction in civilian end-strength and full-time equivalents. Changes to personnel levels are discussed within the narrative of each activity group. The reductions are part of the Army’s initiative to align end strength with operational requirements and support transformation efforts across both the Supply Management and Industrial Operations activity groups. Civilian and military end strength and civilian full-time equivalents are shown below in Table 1. Table 1 – Personnel FY 2025 FY 2026 FY 2027 Supply Management Civilian End Strength Full Time Equivalents Military End Strength 1,941 1,935 2 1,746 1,746 2 1,746 1,746 2 Industrial Operations Civilian End Strength Full Time Equivalents Military End Strength 16,101 16,570 22 15,631 15,631 22 14,670 14,580 21 Total Civilian End Strength Full Time Equivalents Military End Strength 18,042 18,505 24 17,377 17,377 24 16,416 16,326 23 9 === page 14 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Revenue and Expenses Revenue reflects the volume of work executed by the AWCF activity groups, while expenses capture the cost of goods and services produced or sold. In FY 2027, both revenue and expenses are projected to decline compared to prior years. The reduction in expenses is largely due to lower labor and material costs in Industrial Operations and lower cost of goods sold in Supply Management. Table 2 and Chart 1 show revenue and expenses for Supply Management and Industrial Operations. Table 2 - Revenue and Expenses ($ Millions) Supply Management Gross Sales Less Credit Supply Management Net Sales Industrial Operations Total Revenue FY 2025 FY 2026 FY 2027 8,842.6 1,640.7 7,201.9 5,027.8 12,229.7 9,088.8 1,588.8 7,500.0 4,707.3 12,207.3 9,040.9 1,517.7 7,523.1 4,281.5 11,804.7 Supply Management Industrial Operations Total Expenses 6,984.0 5,036.1 12,020.1 7,240.2 4,720.3 11,960.5 7,172.3 4,444.0 11,616.3 Note: Total revenue above does not include Supply Management appropriated funds as shown on the Supply Management Exhibit Fund 14, Revenue and Costs. Numbers may not add due to rounding. Chart 1 - Revenue and Expenses $ Millions 12,000.0 9,000.0 6,000.0 3,000.0 - Revenue Expenses 10 FY 2025 12,229.7 12,020.1 FY 2026 12,207.3 11,960.5 FY 2027 11,804.7 11,616.3 === page 15 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Net and Accumulated Operating Results Financial performance is measured by comparing actual results to goals. The goal of the AWCF is to break even over time. The Army considers several factors when determining the amount of Accumulated Operating Result (AOR) to return in the rates. Returning a large positive AOR balance in one year may cause the rates to drop significantly in that year and increase significantly in the following year. In addition, the Army reviews the cash balance and the projected balance for the budget year to determine if sufficient cash exists to return the gain to the customers. The Supply Management and Industrial Operations activity groups’ rates will drive AOR of zero in FY 2027. Table 3 shows the net and accumulated operating results for both Supply Management and Industrial Operations. Details can be found under the NOR and AOR section for each business area. Table 3 - Operating Results ($ Millions) Supply Management NOR Prior Year AOR Non-Recoverable AOR AOR Industrial Operations Recoverable NOR AOR FY 2025 FY 2026 FY 2027 (150.1) 189.0 (210.0) (171.1) 259.8 (171.1) (203.6) (114.9) 350.8 (114.9) (235.9) 0.0 123.8 (7.7) 80.6 72.9 (72.9) 0.0 Note: Numbers may not add due to rounding. Customer Rates Each activity group has a unique rate structure. The Supply Management activity group adds a Cost Recovery Rate (CRR) to the price of inventory items sold to recoup operating costs. Typical cost categories within the CRR include civilian pay, distribution depot costs, transportation costs, other defense bills associated with supply operations, and costs of replacing inventory losses. The Industrial Operations activity group sets customer rates on a Direct Labor Hour (DLH) basis. The hourly composite rate recovers all costs, both direct and overhead. Activity group rates are stabilized so that the customer’s buying power is protected from price swings during the year of execution. The Supply Management CRR will increase in FY 2027. The Industrial Operations rate decreases in FY 2027 as the business right-sizes workforce to workload. Table 4 shows the Supply Management composite CRR and the Industrial Operations composite DLH rates. 11 === page 16 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Table 4 - Customer Rates Supply Management FY 2025 17.7% FY 2026 19.5% FY 2027 22.2% Industrial Operations $238.30 $227.15 $226.29 Customer Rate Change The revised Supply Management price change to customers is the change of the estimated standard price of an item from the previous year to the budget year, incorporating both overhead cost adjustments and projected materiel inflation that will raise the price of an item. The Industrial Operations composite revenue rate is comprised of direct labor and material costs, overhead costs (mission indirect and non-mission indirect costs) and accumulated operating result adjustments that are designed to return gains or recover losses. Table 5 shows the customer rate change for both business areas. Table 5 - Price Change to Customer Supply Management Industrial Operations 12 FY 2025 FY 2026 FY 2027 1.9% 2.0% 6.1% (4.7%) 6.7% (0.4%) === page 17 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Fund Balance with Treasury The Defense Working Capital Fund Fund Balance with Treasury, account symbol 97X4930, is subdivided at Treasury into five sub-numbered Treasury accounts. The Army’s account is 97X4930.001. The current balance of funds with Treasury is equal to the amount at the beginning of the fiscal year plus the cumulative fiscal-year-to-date amounts of collections, appropriations, and transfers-in minus the cumulative fiscal-year-to-date amounts of disbursements, withdrawals, and transfers-out. The AWCF is required to maintain a positive cash balance to prevent an Anti-deficiency Act violation under Title 31, USC, § 1517(a), Prohibited obligations and expenditures. Unlike appropriated funds, the AWCF cash balance is not equal to outstanding obligations. Cash on hand at Treasury must be sufficient to pay bills when due. The operational requirement may include any positive Accumulated Operating Results returned to customers, cash equal to undisbursed direct appropriations, and an appropriate level of reserves to address risk mitigation factors. The cash balance is primarily affected by cash generated from operations, but the balance is also impacted by appropriations, transfers, and withdrawals. Maintaining a proper cash balance is dependent on setting rates to recover full costs, including prior year losses, and accurately projecting workload. Cash From Operations The day-to-day operation of the AWCF consumes cash with disbursements and replenishes cash with collections. The FY 2027 cash plan includes all expected collections and disbursements from the operation of both the Supply Management and Industrial Operation activity groups, including appropriations and transfers. Chart 2 displays collections and disbursements from operations; however, it does not include receipt of appropriations or transfers. The Army forecasts a slight decrease to collections in FY 2027 as sales and revenue are projected to decrease. Disbursements are projected to decrease due to lower contract authority requirements in FY 2026 and FY 2027. 13 === page 18 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Chart 2 - Cash from Operations $ Millions 12,000 9,000 6,000 3,000 - Collections Disbursements FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 11,500 11,325 10,946 11,752 12,662 11,912 12,079 11,780 12,933 11,976 10,158 10,909 11,936 12,705 12,381 11,697 Chart 3 displays the potential risk to the AWCF cash balance through FY 2027 due to unliquidated obligations (ULOs). The ULOs represent the dollar value of material and services ordered but not yet received by the AWCF. The ULOs will result in future disbursements, reducing cash. There is increased risk to cash when ULOs are high even though collections from backorders mitigate a portion of this risk. Fund managers must maintain a sufficient cash balance to cover future disbursements as the material and services are delivered. The Supply Management activity group projects an increase in overall cash liability due to an increase in ULOs and a reduction in backorders, even though cash is projected to increase. 14 === page 19 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Chart 3 – Cash Liability $ Millions 10,000 8,000 6,000 4,000 2,000 - FY 20 Cash Liability 4,717 Supply ULOs 7,825 Supply Backorders 1,806 PB27 Cash Plan 1,302 FY 21 2,569 5,709 1,366 1,774 FY 22 953 5,944 1,930 3,061 FY 23 2,084 8,122 2,565 3,472 FY 24 3,617 9,516 2,838 3,060 FY 25 3,985 9,133 3,138 2,010 FY 26 3,872 8,602 2,996 1,734 FY 27 4,156 8,687 2,694 1,837 Appropriations Table 6 shows a consolidated overview of the AWCF appropriation for both the Supply Management and Industrial Operations activity groups. A more detailed breakdown is shown in each activity group’s specific section. The Army is requesting $20.6 million for FY 2027 for Industrial Mobilization Capacity (IMC) requirements. This appropriation request sustains OIB equipment required for mobilization that is idle for more than 80 percent of the time in any one month but used at least once during the year. The Army OIB workload has steadily declined over the past ten years, resulting in some equipment being utilized at these lower rates. The Army requires IMC funding to sustain this equipment, enabling the OIB to rapidly surge in support of a future mobilization. Table 6 – Appropriations ($ Millions) War Reserve Secondary Items Industrial Mobilization Capacity Arsenal Sustainment Initiative Industrial-focused Charrettes Total Appropriated Funds FY 2025 3.6 21.8 120.0 0.0 145.4 FY 2026 0.0 20.6 100.0 5.0 125.6 FY 2027 0.0 20.6 0.0 0.0 20.6 15 === page 20 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Cash Management Plan The Army Working Capital Fund (AWCF) cash balances reflected in this plan are based on the combined operations of its two activity groups, Supply Management and Industrial Operations, and are managed on the principle of full cost recovery. For the Supply Management activity group, the price charged to customers includes both an amount to replace the item sold and a cost recovery rate for operational expenses. While funds collected for overhead are disbursed consistently during the year of execution, the portion for inventory replenishment can take 24 months or longer to disburse due to vendor lead times and delivery schedules. To manage these dynamics, the FY 2027 budget includes a cash plan based on projected operational and capital disbursements, collections, direct appropriations, and transfers. In accordance with updated budget guidance, the AWCF cash requirement is developed using historical data and refined statistical methodologies. This approach establishes upper and lower operational requirements to guide management decisions. The upper operational requirement is a threshold to identify when actions are necessary to reduce the cash balance, mitigating the risk of excess cash, while the lower operational requirement is a benchmark for increasing cash levels to prevent future insolvency. These operating ranges are derived from historical annual net outlays and project a future range with an 80 percent confidence level that the fund will remain within these limits, assuming the fiscal year begins at the range's midpoint. The lower cash requirement also incorporates a risk mitigation component for monthly operational volatility and a cash reserve for customer returns, unliquidated obligations, and Accounts Payable balances. Together, these elements provide sufficient lead time for proactive measures if cash levels approach the lower limit. The Army’s projected ending cash balances are $1,733.5 million in FY 2026 and $1,836.8 million in FY 2027. Although Industrial Operations balances are expected to stay within operating ranges, Supply Management cash is projected to be below the lower limit in FY 2026 before recovering in FY 2027. Chart 4 shows the projected monthly cash balances for both fiscal years, illustrating how operations and appropriations affect the balance relative to the upper and lower limits. The lower operational cash requirement is calculated by adding risk mitigation and reserves, and the upper requirement is found by adding the operational range to that lower limit. Ultimately, the chart analysis indicates that the AWCF cash balance is expected to end FY 2027 within the operational limits, driven primarily by a combination of sustained collections and a stabilization of disbursements. 16 === page 21 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Chart 4 – AWCF Cash Management Plan 5,000 FY 2026 FY 2027 4,500 4,000 $ Millions 3,500 3,000 2,500 2,000 1,500 1,000 500 - Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep PB27 Cash Plan 1,944 1,869 1,704 1,588 1,491 1,688 1,739 1,808 1,741 1,787 1,780 1,734 1,886 1,765 1,652 1,684 1,727 1,780 1,814 1,866 1,790 1,820 1,893 1,837 Upper 3,869 3,869 3,869 3,869 3,869 3,869 3,869 3,869 3,869 3,869 3,869 3,869 3,383 3,383 3,383 3,383 3,383 3,383 3,383 3,383 3,383 3,383 3,383 3,383 Lower 1,581 1,581 1,581 1,581 1,581 1,581 1,581 1,581 1,581 1,581 1,581 1,581 1,452 1,452 1,452 1,452 1,452 1,452 1,452 1,452 1,452 1,452 1,452 1,452 Supply Management Cash Plan Chart 5 displays the Supply Management cash plan for FY 2026 and FY 2027. Separate upper and lower operational limits continue to be calculated within the specific activity group. The Supply Management cash balance is expected to end FY 2027 between the upper and lower operational limits. Chart 5 – Supply Management Cash Plan 3,500 FY 2026 FY 2027 3,000 $ Millions 2,500 2,000 1,500 1,000 500 - Nov Dec Jan Feb Mar Apr May Jun Jul Aug PB27 Cash Plan 1,114 1,050 Oct 869 962 879 910 949 1,001 940 979 1,039 1,019 1,198 1,122 1,046 1,114 1,149 1,163 1,186 1,221 1,150 1,173 1,215 1,182 Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Upper 2,952 2,952 2,952 2,952 2,952 2,952 2,952 2,952 2,952 2,952 2,952 2,952 2,496 2,496 2,496 2,496 2,496 2,496 2,496 2,496 2,496 2,496 2,496 2,496 Lower 1,189 1,189 1,189 1,189 1,189 1,189 1,189 1,189 1,189 1,189 1,189 1,189 1,048 1,048 1,048 1,048 1,048 1,048 1,048 1,048 1,048 1,048 1,048 1,048 17 === page 22 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Cash Plan Chart 6 displays the Industrial Operations activity group cash plan for FY 2026 and FY 2027. Separate upper and lower operational limits continue to be calculated within the specific activity group. The Industrial Operations cash balance is expected to end FY 2027 between the upper and lower operational limits. Chart 6 – Industrial Operations Cash Plan FY 2027 FY 2026 1,200 $ Millions 1,000 800 600 400 200 - Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep PB27 Cash Plan 858 821 835 629 614 780 791 808 801 809 741 715 688 643 606 570 578 617 628 645 640 648 678 655 18 Upper 917 917 917 917 917 917 917 917 917 917 917 917 887 887 887 887 887 887 887 887 887 887 887 887 Lower 391 391 391 391 391 391 391 391 391 391 391 391 404 404 404 404 404 404 404 404 404 404 404 404 === page 23 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates End of Year Cash Balance Table 7 shows total collections, disbursements, net outlays, appropriations, transfers, and ending cash balances. Upper and lower operational range cash requirements are identified to measure the sufficiency of cash. The FY 2027 cash balance is projected to be within the upper and lower operational requirements. Table 7 - Cash Balance ($ Millions) Disbursements Collections Net Outlays from Operations Direct Appropriations Transfers In (+) Transfers Out (-) Total Net Outlays FY 2025 12,705.3 11,911.5 793.8 143.6 0.0 400.0 1,050.2 FY 2026 12,380.9 12,078.7 302.1 125.6 0.0 100.0 276.6 FY 2027 11,696.9 11,779.6 (82.7) 20.6 0.0 0.0 (103.3) Ending Cash Balance Upper Operating Range Lower Operating Range 2,010.1 3,861.8 1,573.3 1,733.5 3,869.2 1,580.7 1,836.8 3,382.7 1,452.2 Capital Budget The AWCF activities develop and maintain operational capabilities by acquiring or replacing production equipment, executing minor construction projects, and developing software. New equipment is acquired to replace obsolete and unserviceable equipment, modernize production and maintenance processes, and eliminate environmental hazards. The cost of capital projects is recouped through capital investment recovery, which is included in customer rates. Unlike the operating budget, which contains the annual operating costs of each activity, the capital budget justifies the purchase of assets that equal or exceed a unit cost of $250,000 and have a useful life of two or more years. A more in-depth discussion and detailed exhibits are provided in the Capital Budget section. Table 8 summarizes the AWCF CIP request. Table 8 - Capital Budget ($ Millions) Supply Management Industrial Operations Total Capital Budget Total Capital Cash Outlays FY 2025 10.7 59.7 70.3 88.6 FY 2026 15.5 139.0 154.5 110.3 FY 2027 23.6 84.3 107.9 123.7 Note: Numbers may not add due to rounding. 19 === page 24 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Supply Management Introduction T he Supply Management activity group operates in a business-like environment by relying on sales revenue rather than appropriations to finance continuing operations. This enterprise uses contract authority to procure and repair spare parts. As suppliers deliver equipment components, the Army Working Capital Fund (AWCF) expends cash and places spare parts in inventory to await customer demands. Filled customer demands result in Mission: the collection of sales revenue, which Provide the Army with inventory management of spare replenishes cash. The Supply Management and repair parts supporting enterprise synchronizes rates and budget equipment sustainment, assumptions with Army appropriated funding operational readiness, and requests in support of Soldier and weapon combat capability. systems readiness. The bulk of demands originate from Operation and Maintenance, Army customers, who primarily request spare parts to maintain combat equipment readiness for the Army operating forces. The Army prices spare parts based on the most recent acquisition cost from a commercial vendor, or the most recent repair cost from a contract or organic source of repair. The price of each item includes a surcharge known as the cost recovery rate (CRR), to recover the cost of AWCF operations. The intent of the CRR is to:    Recover the activity’s overhead costs such as payroll, supplies, contracts, storage, transportation, and depreciation Maintain a sufficient cash corpus to cover disbursements Break even over time The core financial measures for Supply Management are the net operating result (NOR) and accumulated operating result (AOR). The NOR measures the activity’s gain or loss within a single fiscal year and is used to monitor how closely the activity performs compared to its budget. The AOR measures the activity’s accumulated gains and losses since the fund’s inception. Rates are set during budget development to break even by bringing the AOR to zero over a budget cycle. This method returns accumulated gains through reduced rates and recovers accumulated losses through increased rates. The cash management section describes the impact of cash balance analysis on rate setting. The unit cost is another core financial measure, and relates operating costs to each dollar 20 === page 25 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates of sales. The unit cost can be set at, above, or below 1.0 depending on projected sales volume; the unit cost section discusses this metric. Efficiencies and Business Process Improvements Cost efficiency is an inherent attribute of the AWCF. The revolving fund construct promotes total cost visibility, full cost recovery, and fosters a businesslike, competitive atmosphere. Although commercial businesses focus on their bottom-line profit, the Supply Management activity focuses on unit cost and other indicators to gauge the efficiency of the operation. Supply Management activities are reducing overhead costs, also known as logistics operations (LOGOPS), by streamlining command and control structures and relying on technology to create efficiencies. Army Materiel Command (AMC) continues proactive measures to reduce inventory and optimize supply chain management through the Sales and Operations Planning (S&OP) process. The S&OP process allows management better oversight and improves the supply chain review process and financial planning. The supply chain review process has shifted from the legacy review of inventory by segmentations to total inventory holdings. The S&OP decisions and action plans align to established strategic goals and are executed through the Army's supply action module, Material Requirements Planning (MRP), in the Logistics Modernization Program (LMP), AWCF’s Enterprise Resource Planning (ERP). Army’s current focus is on improving inventory turns, establishing new inventory reduction goals, and reducing forecast errors. AMC also facilitates quarterly reviews of unserviceable assets to better assess the ability to repair rather than initiating new procurement. AMC has also adopted two automated processes to complete its annual price and credit review:  The Price and Credit Exercise Builder (PCEX) introduced automation to reduce manual effort and ensures seamless data integration. This enhancement significantly minimizes errors, expedited reviews, and shifted focus from trouble shooting to substantive analysis.  The Decision Support Tool (DST) enhances visibility of demand patterns, excess inventory, stock availability, and other key metrics, enabling supply chain personnel to make informed pricing decisions while increasing data ownership and eliminating delays caused by intermediary coordination. 21 === page 26 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Inventory Management The Army uses a monthly Supply Chain Planning and Reporting Tool (SCPRT) to calculate inventory requirements. SCPRT aligns reporting requirements with LMP’s MRP. MRP uses backwards planning of requirements to improve forecasting and supports Warfighter requirements. The volume of inventory purchases is largely based on future projections of customer orders and the need to replenish past unplanned sales. Army continuously takes proactive measures to ensure forecasted inventory meets future demands. Army reviews and validates requirement levels versus inventory levels, maintaining focus on buying and repairing items needed by customers, and not retaining excess inventory. Functional Description The Supply Management activity group buys and manages an operating inventory of Army-managed and non-Army managed spare and repair parts for sale to its customers, primarily Army operating units. The AWCF operating inventory is stored and maintained primarily at more than 200 supply support activities (SSA). SSA management includes, but is not limited to, stocking the items needed for customer readiness, monitoring performance metrics, and conducting inventories. Inventory is managed at national and below national levels as described below:  National Level - consists of life cycle management commands, depots, and arsenals. Materiel may be Army managed or non-Army managed meaning the source of supply may be Department of the Army, another Service, or another Department of War activity. Typically, SSAs request and receive materiel from the national level.  Below National Level:  Tactical – under the control of Sustainment Brigade Commanders. These SSAs provide spares supporting the immediate needs of combat support battalions and companies. The quantity of inventory items is limited to an amount capable of transport by unit organic vehicles or aircraft.  Installation - under the control of the Logistics Readiness Centers (LRC). These activities provide a means to retrograde unneeded materiel from tactical SSA to meet other Army requirements. They also stock back-up inventory to meet tactical units' requirements that exceed storage capacity. When deployed to a theater of operations, tactical activities receive back-up support from a theater distribution center established by the deployed force command to centrally receive, redistribute, and retrograde spares as required. 22 === page 27 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Activity Group Composition Figure SM 1 below displays the locations of Headquarters, Army Materiel Command (AMC), each Life Cycle Management Command (LCMC), and the Army Sustainment Command. The AMC mission is complex and ranges from developing sophisticated weapon systems, to advancing research, to maintaining, and distributing spare parts. Three core competencies encompass AMC’s mission: acquisition excellence, logistics power projection, and technology generation and application. AMC works closely with industry, colleges and universities, the other Services, and other government agencies developing, buying, and maintaining state-of-the-art materiel for Army. Figure SM 1 - Supply Management locations U.S. Army Sustainment Command Rock Island, IL TACOM LCMC Warren, MI TACOM LCMC Natick, MA CECOM LCMC Aberdeen Proving Ground, MD AMCOM LCMC Huntsville, AL Army Materiel Command Headquarters, Huntsville, AL The LCMCs, assigned to AMC, manage the activity group. Each LCMC acquires and manages consumable supplies and spare parts for distinct categories of weapon systems. The Army Sustainment Command acquires and maintains the Army Prepositioned Stocks, which contain materiel from each LCMC. 23 === page 28 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates The mission of the Tank-automotive and Armaments Command (TACOM) LCMC includes developing, acquiring, equipping, and sustaining ground and support systems for Soldiers and other joint operations through the integration of effective and timely acquisition, logistics, and technology. The TACOM LCMC item managers support a diverse set of product lines through their life cycles, ranging from tracked combat and wheeled tactical vehicles, armaments, and watercraft, to Soldier-specific gear and biological/chemical equipment. Major weapon systems supported M1A3 Abrams fires its main gun during a multinational joint training live fire exercise (U.S. Army photo by Sgt. include the M1 Abrams Tank, M2 Terron Williams) Bradley Fighting Vehicle, Mine Resistant Ambush Protected (MRAP) vehicle, and Stryker family of vehicles. TACOM LCMC is also responsible for providing clothing and heraldry products to Soldiers, units, and veterans. Included in TACOM LCMC is a small retail business of high-demand non- Army managed items (NAMI). TACOM LCMC Headquarters activities are located at Detroit Arsenal in Warren, Michigan and U.S. Army Soldier Systems Center in Natick, Massachusetts. The Communications-Electronics Command (CECOM) LCMC mission is to develop, provide, integrate, and sustain command, control, communications, computers, intelligence, surveillance, and reconnaissance capabilities for the Army. CECOM LCMC Headquarters activity is located at Aberdeen Proving Ground, Maryland. Soldiers sit atop an observation point during training (U.S. Army photo by Pfc. Jose Nunez) 24 === page 29 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates The mission of the Aviation and Missile Command (AMCOM) LCMC includes developing, acquiring, fielding, and sustaining aviation, missile, and unmanned vehicle systems, ensuring readiness with seamless transition to combat operations. Major weapon systems supported include the AH-64 Apache, UH-60 Black Hawk, CH-47 Chinook, Multiple Launch Rocket System, and Patriot missile. AMCOM LCMC Headquarters activity is located at Two Chinook Helicopters sling load M119 Redstone Arsenal in Huntsville, Alabama Howitzers during an air assault operation (U.S. Army photo by Sgt. Olivia Cowart) and has operational control of all aviation logistics management functions at Fort Rucker, Alabama, home of the Army Aviation Center. The mission of the Army Sustainment Command (ASC) includes synchronizing the distribution and sustainment of materiel to and from the field. Army Prepositioned Stocks are acquired and maintained as part of this mission. These stocks include combat equipment, supplies, and humanitarian mission stocks at worldwide land and sea-based positions. ASC is located at Rock Island Arsenal, Illinois. 25 === page 30 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Budget Highlights Assumptions The FY 2027 budget represents a business plan that supports Soldier and weapon systems readiness for both peacetime training and overseas operating requirements. The AWCF provides materiel readiness to operating units in support of the Army’s training strategy to build and sustain critical warfighting capabilities focused on multidomain operations. The AWCF provides support to ensure the Army remains the most lethal and ready land force in the world, prepared to meet any challenge, and defend the nation’s interests. If customer demand levels exceed budget estimates during the year of execution, variability target is included in the budget to ensure supply contract authority is available to remain ready and responsive to changing operational requirements. Variability target is further discussed in the Operating Contract Authority section. Personnel The personnel end strength reflects actual execution in FY 2025 and authorized levels in FY 2026 and FY 2027. The reduction to authorizations is part of the Army’s initiative to streamline the civilian workforce to better align with operational requirements. Personnel levels include supply planners, logistics management specialists, and general and administrative support positions. Military end strength in FY 2027 is two. Chart SM 1 – Civilian Personnel 2,000 1,500 1,000 500 0 Civilian End Strength Civilian FTE 26 FY 2025 1,941 1,935 FY 2026 1,746 1,746 FY 2027 1,746 1,746 === page 31 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Sales Sales reflect income from operations and do not include direct appropriations for war reserve materiel. Credit is issued to customers for materiel turn-ins that can be used by the supply activity to support a future sale. The amount of credit issued offsets revenue from Gross Sales. Chart SM 2 reflects actual execution in FY 2025 and projected levels in FY 2026 and FY 2027. FY 2027 sales total includes an $80 million surcharge to support cash levels. Several exhibits display Sales: Fund 14, Revenue and Costs; Fund 11, Source of New Orders and Revenue; and SM 1, Supply Management Summary (sales net of credit). Chart SM 2 – Sales 10,000.0 $ Millions 8,000.0 6,000.0 4,000.0 2,000.0 0.0 Gross Sales Credit Net Sales FY 2025 8,842.6 1,640.7 7,201.9 FY 2026 9,088.8 1,588.8 7,500.0 FY 2027 9,040.9 1,517.7 7,523.1 Expenses Expenses consist of materiel and operational costs. The decrease in projected FY 2027 expenses is attributed to lower sales volume. Expenses are displayed on exhibit Fund 14, Revenue and Costs. Chart SM 3 – Expenses 8,000.0 $ Millions 6,000.0 4,000.0 2,000.0 0.0 Total Expenses FY 2025 6,984.0 FY 2026 7,240.2 FY 2027 7,172.3 27 === page 32 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Operating Contract Authority The budget requests operating contract authority (CA) for the acquisition, repair, and replenishment of spare parts. The FY 2027 CA request is consistent with projected sales to replenish inventory sold in FY 2027, to balance future readiness with cash affordability. Army’s FY 2027 hardware CA request is structured to replenish materiel sold in FY 2027, after the FY 2026 CA request was reduced to address the FY 2025 sales variance. The budget includes $2 billion in variability target to ensure CA is available to respond rapidly to unexpected surges in customer demands during the year of execution. Operating CA is displayed on exhibit SM 1, Supply Management Summary and SM 3b, Operating Requirements by Weapon System. Chart SM 4 –Operating Contract Authority (CA) 10,000.0 $ Millions 8,000.0 6,000.0 4,000.0 2,000.0 0.0 LOGOPS CA Hardware CA Total Operating CA FY 2025 1,277.6 7,130.6 8,408.2 FY 2026 1,172.4 6,021.4 7,193.8 FY 2027 1,168.5 6,252.4 7,420.9 Inventory Inventory values shown in chart SM 5, include operational inventory, carcasses awaiting repair, inventory required beyond the budget year, economic and contingency retention stock, and secondary items included in war reserve. Supply Management inventory levels will increase due to higher inventory receipts than materiel sales. Inventory is displayed on exhibit SM 4, Inventory Status. 28 === page 33 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Chart SM 5 – Inventory $ Millions 20,000.0 15,000.0 10,000.0 5,000.0 0.0 Inventory FY 2025 20,012.9 FY 2026 20,643.1 FY 2027 20,914.0 Operating Results The net operating result (NOR) represents the difference between revenue and expenses within a fiscal year. The accumulated operating result (AOR) represents the summation of all operating gains and losses since activity group inception, along with any prior period adjustments. AWCF operates on a breakeven basis during the budget cycle. The Supply Management AOR is projected to be zero in FY 2027. In the next budget cycle, Supply Management will evaluate its AOR projections, cash position, and impact on future rates to determine the amount of AOR to recover or return. NOR and AOR are displayed on exhibit Fund 14, Revenue and Costs. Table SM 1 - Operating Results ($ Millions) Net Operating Result Prior Year AOR Non-Recoverable AOR Accumulated Operating Result FY 2025 (150.1) 189.0 (210.0) (171.1) FY 2026 259.8 (171.1) (203.6) (114.9) FY 2027 350.8 (114.9) (235.9) 0.0 Cost Recovery Rate The Supply Management cost recovery rate (CRR) is set to recover full costs and adjust for gains and losses. Typical costs recovered include civilian pay, distribution depot costs, transportation costs, other bills associated with supply operations, and costs of replacing inventory washouts. The FY 2027 CRR increases with the inclusion of an $80 million cash surcharge to support the Army’s cash balance. The revised price change to customers is the change of the estimated standard price of an item in the budget year from the standard price of an item in the previous year, to include the change in overhead costs as well as the projected materiel inflation that will raise the price of an item. 29 === page 34 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Table SM 2 – Cost Recovery Rate (CRR) and Price Change CRR Revised Price Change to Customer FY 2025 17.7% 1.9% FY 2026 19.5% 6.1% FY 2027 22.2% 6.7% Unit Cost The unit cost is a metric relating operating cost to each dollar of sales. Unit cost is calculated by dividing net operating costs (the sum of total obligations to include capital investment program (CIP) minus any prior year de-obligations) by net sales. A unit cost below 1.0 indicates that the enterprise is selling and not replenishing, thus reducing the CA executed below the sales amount. A unit cost above 1.0 indicates the Army is purchasing inventory in anticipation of future need based upon inventory management forecasts or is replenishing inventory sold from previous years. FY 2026 unit cost is set below 1.0 to sell off inventory that was not sold in FY 2025. FY 2027 unit cost is set to 0.99 to fully replenish FY 2027 projected materiel sold but not make purchases against the $80 million surcharge included in sales. Potential readiness impacts are monitored and can be addressed with variability target to respond rapidly to unexpected variances in costs or customer demands during the year of execution. Chart SM 6 shows unit cost for FY 2025 through FY 2027. Chart SM 6 - Unit Cost Ratio 1.25 1.00 0.75 Unit Cost FY 2025 1.05 Unit Cost 30 FY 2026 0.96 = Net Obligations Net Sales FY 2027 0.99 === page 35 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Collections, Disbursements, and Outlays Collections are projected based on forecasted sales and changes in accounts receivable. Disbursements are projected based on monthly operating obligations, changes in accounts payable, and Capital Investment Program obligations. FY 2027 sales and collections are forecasted to decrease as the Army projects less flying hours. Disbursements are projected to decrease due to reduced materiel deliveries. The values in Chart SM 7 do not include direct appropriations or cash transfers into the AWCF. Chart SM 7 – Cash Management 10,000.0 $ Millions 8,000.0 6,000.0 4,000.0 2,000.0 0.0 FY 2025 FY 2026 FY 2027 Collections 7,259.4 7,500.6 7,523.1 Disbursements 7,947.5 7,739.6 7,360.0 Net Outlays 688.1 239.0 (163.1) Performance Measurement Supply Availability Supplying and maintaining Army’s equipment remain key components of readiness. The supply availability (SA) goal is a key performance measure indicating the ability of the supply system to fill requisitions. The Army’s goal is 85 percent of customer demands fulfilled immediately. SA is administered through adequate funding of hardware, proper management of the supply chain, and reliable oversight of materiel stockage requirements. Chart SM 8 displays SA throughout FY 2025 below the 85 percent goal and ending the fourth quarter at 84 percent. The Army’s contract authority requirement supports the 85% SA goal in FY 2027. 31 === page 36 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Chart SM 8 – Supply Availability (SA) 1.00 Percent 0.75 0.50 0.25 0.00 FY 2025 1st Qtr 80.0% 2nd Qtr 82.0% 3rd Qtr 80.0% 4th Qtr 84.0% Backorders Backorders are expected to decrease in FY 2027 as a result of lower new order receipts. Backorders for the end of each fiscal year are displayed on exhibit Fund 11, Source of New Orders and Revenue. Chart SM 9 –Customer Backorders (End of Period) $ Millions 3,000.0 2,000.0 1,000.0 0.0 Backorders FY 2025 3,137.6 FY 2026 2,996.3 FY 2027 2,693.6 Supply Management Workload Table SM 3 below displays Supply Management workload drivers. The decreases in requisitions received are consistent with new order receipts. 32 === page 37 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Table SM 3 - Supply Management Workload Supply Management Workload Items Managed Requisitions Received Issues Completed Procurement Receipts Contracts Awarded FY 2025 118,628 561,542 322,015 71,590 14,763 FY 2026 116,109 549,616 335,346 69,847 12,466 FY 2027 113,392 536,755 336,379 65,777 12,945 Hardware Undelivered Orders Undelivered orders represent goods and services ordered but not yet received by AWCF. A sufficient cash balance is required to pay suppliers upon receipt of these orders. As shown in chart SM 10, undelivered orders are projected to increase as more materiel is ordered in FY 2027. Chart SM 10 – Hardware Undelivered Orders $ Millions 8,000.0 6,000.0 4,000.0 2,000.0 0.0 Undelivered Orders FY 2025 8,487.4 FY 2026 7,959.3 FY 2027 8,043.8 33 === page 38 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Appropriations In FY 2025, the Army Working Capital Fund (AWCF) made an annual request to purchase War Reserve Secondary Items (WRSI) for operational project stocks. Operational project stocks are equipment stocks above the Modification Table of Organizational Equipment (MTOE)/Table of Distribution and Allowances (TDA) requirements tailored to key contingency operations or to support civil disturbance relief, disaster relief, humanitarian assistance, or other approved missions. As part of the initiative to reduce Army Prepositioned Stocks (APS) to minimum sustainment posture, the AWCF is not requesting appropriations for WRSI in FY 2027. SM 4, Inventory Status and SM 6, War Reserve Materiel exhibits displays War Reserve inventory. Exhibit Fund 14, Revenue and Costs displays requested Appropriations. Table SM 4 - Appropriations ($ Millions) War Reserve Secondary Items 34 FY 2025 FY 2026 FY 2027 3.6 0.0 0.0 === page 39 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Supply Management Source of New Orders and Revenue ($ in Millions) FY 2025 FY 2026 FY 2027 1. New Orders a. Orders from DOW Components: Department of Army Operation & Maintenance, Army Operation & Maintenance, ARNG Operation & Maintenance, AR Subtotal, O&M Army 6,039.4 739.1 142.3 6,920.8 6,178.8 591.2 98.4 6,868.4 6,102.2 593.4 97.7 6,793.3 Aircraft Procurement Missile Procurement Weapons & Tracked Combat Vehicles Procurement of Ammunition Other Procurement Subtotal Procurement 41.2 1.5 85.0 7.2 32.8 167.7 56.8 4.8 38.4 1.8 33.4 135.2 56.5 4.8 38.2 1.8 29.2 130.5 RDT&E BRAC Family Housing Military Construction Chem Agents & Munitions Dest, Army Other Army Subtotal All Other Army 37.8 0.0 3.5 0.0 0.0 2.0 43.4 49.3 0.0 0.0 0.0 0.0 2.0 51.2 49.0 0.0 0.0 0.0 0.0 1.9 50.8 Subtotal, Department of the Army 7,131.9 7,054.9 6,974.7 Department of Air Force O&M Department of Air Force Investment Department of Navy O&M Department of Navy Investment US Marines O&M US Marines Investment Other Department of War Subtotal Other DOW Services 0.0 0.0 22.4 0.0 46.8 0.0 179.6 248.9 34.3 0.0 87.3 0.0 49.5 0.1 225.6 396.9 34.4 0.0 88.1 0.0 47.9 0.1 209.0 379.6 EXHIBIT FUND-11 SOURCE OF NEW ORDERS AND REVENUE 35 === page 40 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Supply Management Source of New Orders and Revenue ($ in Millions) FY 2025 FY 2026 FY 2027 645.8 0.0 53.5 91.9 4.7 0.0 0.0 0.0 9.7 0.0 56.8 862.3 572.9 2.0 5.2 16.2 3.8 0.0 0.0 0.0 0.0 0.0 0.0 600.1 464.8 2.2 5.5 17.2 4.0 0.0 0.0 0.0 0.0 0.0 0.0 493.7 8,243.1 8,051.9 7,848.0 13.0 0.0 0.6 884.9 0.0 898.5 19.5 0.0 0.6 875.5 0.0 895.6 19.9 0.0 0.6 869.7 0.0 890.2 1. Total New Orders 9,141.7 8,947.5 8,738.2 2. Carry-In Orders (Back Orders From Prior Years) 2,838.5 3,137.6 2,996.3 3. Total Gross Orders 11,980.1 12,085.1 11,734.4 4. Carry-Out Orders (-) 3,137.6 2,996.3 2,693.6 5. Gross Sales 8,842.6 9,088.8 9,040.9 6. Credit and Allowances (-) 1,640.7 1,588.8 1,517.7 7. Net Sales 7,201.9 7,500.0 7,523.1 b. Defense Working Capital Fund (DWCF) Industrial Operations, Army Supply Management, Army Supply Management, Air Force Supply Management, Navy Supply Management, Marine Corps DECA DFAS DISA DLA TRANSCOM Other Subtotal DWCF c. Total DOW d. Other Orders: Other Federal Agencies Trust Fund Non Federal Agencies Foreign Military Sales Nonappropriated Subtotal, Other Orders 36 EXHIBIT FUND-11 SOURCE OF NEW ORDERS AND REVENUE === page 41 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Supply Management Revenue and Costs ($ in Millions) FY 2025 FY 2026 FY 2027 Revenue AMI Sales NAMM Sales Total Gross Sales Credit and Allowances Net Sales Other Income War Reserve-Secondary Items Imputed Financing Sources Total Income: 6,895.4 1,947.2 8,842.6 1,640.7 7,201.9 35.7 3.6 32.0 7,237.5 7,185.4 1,903.4 9,088.8 1,588.8 7,500.0 0.0 0.0 0.0 7,500.0 6,936.6 2,104.3 9,040.9 1,517.7 7,523.1 0.0 0.0 0.0 7,523.1 Costs Cost of Materiel Sold from Inventory AMI NAMM Total Cost of Materiel Sold from Inventory Inventory Losses/Obsolescence 3,860.1 1,848.9 5,709.0 25.2 4,074.0 1,845.4 5,919.3 132.7 3,832.4 2,064.6 5,897.0 90.9 Salaries and Wages Total Military Personnel Compensation & Benefits Civilian Personnel Compensation & Benefits Travel & Transportation of Personnel Materiel & Supplies (For Internal Operations) Equipment Other Purchases from Revolving Funds Transportation of Things Capital Investment Recovery (CIR) - Capital Printing and Reproduction Advisory and Assistance Services Audit Readiness (memo entry) Financial Statement Audit (memo entry) Rent, Communication, Utilities & Misc. Charges Other Purchased Services Total Operating Expenses 322.2 0.2 322.0 0.9 0.5 3.8 381.3 87.4 17.2 0.0 80.4 13.0 19.1 0.0 356.2 1,249.8 300.5 0.2 300.3 2.3 0.5 5.7 371.6 99.0 15.8 0.0 54.5 9.5 14.7 0.0 338.3 1,188.2 298.3 0.2 298.2 2.5 0.5 5.7 370.1 101.7 15.9 0.0 55.0 9.5 14.9 0.0 334.7 1,184.4 Total Expenses 6,984.0 7,240.2 7,172.3 Operating Result 253.6 259.8 350.8 0.0 0.0 0.0 Other Changes Affecting NOR: Less Direct Funding Adjustment for Cash Transfer (3.6) (400.0) 0.0 0.0 0.0 0.0 Net Operating Result Prior Year AOR (150.1) 189.0 259.8 (171.1) 350.8 (114.9) Non-Recoverable AOR for Budget Purposes (210.0) (203.6) (235.9) Accumulated Operating Result (171.1) (114.9) 0.0 Less Recovery of Prior Year Pricing Discrepancies EXHIBIT FUND-14 REVENUE AND COSTS 37 === page 42 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Supply Management Supply Management Summary ($ in Millions) Net Customer Orders Net Sales Obligation Targets Direct Direct Appropriation - Appropriation Mobilization Other Total Non-Army Managed Items (NAMI) FY 2025 FY 2026 FY 2027 1,946.5 1,902.5 2,033.5 1,946.3 1,902.4 2,103.3 1,989.9 1,902.4 2,102.4 0.0 0.0 0.0 0.0 0.0 0.0 1,989.9 1,902.4 2,102.4 Army Managed Items (AMI) FY 2025 FY 2026 FY 2027 5,554.5 5,456.2 5,186.9 5,255.6 5,597.6 5,419.8 5,140.8 4,119.0 4,150.0 0.2 0.0 0.0 0.0 0.0 0.0 5,141.0 4,119.0 4,150.0 AMC Mobilization FY 2025 FY 2026 FY 2027 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.6 0.0 0.0 0.0 0.0 0.0 1.6 0.0 0.0 Total Hardware FY 2025 FY 2026 FY 2027 7,501.0 7,358.7 7,220.4 7,201.9 7,500.0 7,523.1 7,130.6 6,021.4 6,252.4 1.8 0.0 0.0 0.0 0.0 0.0 7,132.5 6,021.4 6,252.4 Cost of Operations (LOGOPS) FY 2025 FY 2026 FY 2027 Total Operating Authority FY 2025 FY 2026 FY 2027 38 Operating (Contract Authority) 1,277.6 1,172.4 1,168.5 7,501.0 7,358.7 7,220.4 7,201.9 7,500.0 7,523.1 8,408.2 7,193.8 7,420.9 EXHIBIT SM-1 SUPPLY MANAGEMENT SUMMARY 1,277.6 1,172.4 1,168.5 1.8 0.0 0.0 0.0 0.0 0.0 8,410.0 7,193.8 7,420.9 === page 43 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Supply Management Supply Management Summary ($ in Millions) Net Customer Orders Net Sales Total Capital Obligations (CIP) FY 2025 FY 2026 FY 2027 Variability Target FY 2025 FY 2026 FY 2027 Operating (Contract Authority) Obligation Targets Direct Direct Appropriation - Appropriation Mobilization Other Total 10.7 15.5 23.6 10.7 15.5 23.6 0.0 2,000.0 2,000.0 0.0 2,000.0 2,000.0 Target Total FY 2025 FY 2026 FY 2027 7,501.0 7,358.7 7,220.4 7,201.9 7,500.0 7,523.1 8,418.8 9,209.2 9,444.5 1.8 0.0 0.0 0.0 0.0 0.0 8,420.7 9,209.2 9,444.5 Direct Appropriations Mobilization - War Reserve Materiel FY 2025 FY 2026 FY 2027 3.6 0.0 0.0 TOTAL DIRECT APPROPRIATIONS FY 2025 FY 2026 FY 2027 3.6 0.0 0.0 EXHIBIT SM-1 SUPPLY MANAGEMENT SUMMARY 3.6 0.0 0.0 0.0 0.0 0.0 3.6 0.0 0.0 39 === page 44 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Supply Management Operating Requirements by Weapon System ($ in Millions) FY 2025 Obligations NMCRS1 Weapon System 9.8% 7.5% 9.6% N/A 8.0% 17.0% 15.8% N/A 0.0% 5.1% 20.2% 5.2% 9.1% 10.1% 3.2% 7.1% N/A 14.6% 15.4% 11.5% 13.3% 18.4% 21.4% 0.0% 20.1% 25.6% 17.9% N/A FY 2026 Obligations NMCRS1 526.0 304.5 237.4 8.0 11.1 155.7 0.4 85.2 0.0 2.9 25.4 12.3 0.8 1.2 3.5 0.1 461.7 83.3 60.1 144.4 24.3 92.1 95.8 839.9 122.8 335.5 235.0 249.6 10.0% 10.0% 10.0% N/A <10.0% <10.0% <10.0% N/A <10.0% <10.0% <10.0% N/A <10.0% <10.0% <10.0% <10.0% N/A <10.0% <10.0% <10.0% <10.0% <10.0% <10.0% <10.0% <10.0% <10.0% <10.0% N/A FY 2027 Obligations NMCRS1 AH-64, Apache CH-47, Chinook UH-60, Blackhawk Other Aviation MLRS Patriot Vehicle Mounted Stinger Avenger Other Missile AN/TPQ-36 (Firefinder Radar) AN/TPQ-50 (Lightweight Counter Mortar Radar) AN/TPQ-53 (Counterfire Target Acquistion Radar) CSS VSAT (AN-TSC-1893A) Joint Network Node (JNN) PHOENIX AN/TSC-156 Satelite Transportable Terminal (STT) SMART-T AN/TSC-154/A EHF/AEHF Other Communications Electronics FMTV HEMTT HMMWV JLTV M109, Palidin M777, Towed Howitzer M1A1, Abrams Tank M1A2, Abrams Tank (SEP) M2/M3, Bradley Fighting Vehicle Stryker Other Tank - Automotive & Armament 196.1 396.4 193.5 509.5 59.1 125.6 188.1 0.0 0.0 3.5 29.5 10.4 0.2 0.0 0.0 9.5 476.9 78.2 85.0 140.1 28.5 18.2 140.1 351.2 61.9 307.1 5.7 1,726.4 565.3 357.2 324.8 12.2 14.4 149.0 0.0 87.0 0.0 6.1 11.9 7.5 0.8 0.4 1.7 0.0 417.9 96.4 49.2 153.0 5.3 13.9 227.2 644.8 100.7 153.9 242.9 506.3 Subtotal: 5,140.8 4,119.0 4,150.0 NAMM Hardware Contract Authority AMC-MOB Hardware Contract Authority 1,989.9 0.0 1,902.4 0.0 2,102.4 0.0 Total: 7,130.6 6,021.4 6,252.4 10.0% 10.0% 10.0% N/A <10.0% <10.0% <10.0% N/A <10.0% <10.0% <10.0% N/A <10.0% <10.0% <10.0% <10.0% N/A <10.0% <10.0% <10.0% <10.0% <10.0% <10.0% <10.0% <10.0% <10.0% <10.0% N/A 1: Non Mission Capable Rate Supply (NMCRS) represents the percent of time a weapon system is not mission capable due to lack of critical spare parts. The AWCF goals for NMCRS are: at or below 10% for ground and at or below 25% for aircraft. FY 2025 is actual data. FY 2026 and FY 2027 are the Army's goal for total weapon system readiness. 40 EXHIBIT SM-3b OPERATING REQUIREMENTS BY WEAPON SYSTEMS === page 45 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Supply Management Inventory Status ($ in Millions) FY 2025 TOTAL Demand Based Mobilization Non-Demand Based 1. Inventory BOP 19,141.7 13,015.1 1,030.4 5,096.2 2. BOP Inventory Adjustments A. Reclassification (Memo) B. Price Change Amount (Memo) C. Adj. Inventory BOP 0.0 0.0 19,141.7 0.0 0.0 13,015.1 0.0 0.0 1,030.4 0.0 0.0 5,096.2 3. Receipts at Cost 6,712.9 6,705.1 7.9 0.0 4. Sales at Cost 7,349.7 7,349.7 0.0 0.0 5. Inventory Adjustments A. Capitalization (+ or -) B. Returns from Customers for Credit C. Returns from Customers Without Credit D. Returns to Suppliers (-) E. Transfers to Property Disposal (-) F. Issues/Receipts wo Reimbursements (+ or -) G. Other H. Total Adjustments (3.5) 1,640.7 179.5 (27.5) (163.8) (117.4) 0.0 1,508.0 3.1 1,640.7 100.0 (27.5) (157.8) (100.5) 0.0 1,457.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 (6.6) 0.0 79.5 0.0 (6.1) (16.8) 0.0 50.1 6. Inventory EOP 20,012.9 13,828.4 1,038.3 5,146.2 7. Inventory EOP (MAC) A. Economic Retention (Memo) B. Contingency Retention (Memo) C. Potential DOW Reutilization (Memo) 20,012.9 13,828.4 1,038.3 5,146.2 0.0 0.0 5,146.2 8. Inventory on Order EOP (Memo) 8,487.4 8,469.0 18.4 0.0 EXHIBIT SM-4 INVENTORY STATUS 41 === page 46 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Supply Management Inventory Status ($ in Millions) FY 2026 TOTAL Demand Based Mobilization Non-Demand Based 1. Inventory BOP 20,012.9 13,828.4 1,038.3 5,146.2 2. BOP Inventory Adjustments A. Reclassification (Memo) B. Price Change Amount (Memo) C. Adj. Inventory BOP 0.0 0.0 20,012.9 0.0 0.0 13,828.4 0.0 0.0 1,038.3 0.0 0.0 5,146.2 3. Receipts at Cost 6,549.5 6,545.2 4.3 0.0 4. Sales at Cost 7,508.1 7,508.1 0.0 0.0 5. Inventory Adjustments A. Capitalization (+ or -) B. Returns from Customers for Credit C. Returns from Customers Without Credit D. Returns to Suppliers (-) E. Transfers to Property Disposal (-) F. Issues/Receipts wo Reimbursements (+ or -) G. Other H. Total Adjustments 0.0 1,588.8 0.0 0.0 0.0 0.0 0.0 1,588.8 0.0 1,588.8 0.0 0.0 0.0 0.0 0.0 1,588.8 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6. Inventory EOP 20,643.1 14,454.2 1,042.6 5,146.2 7. Inventory EOP (MAC) A. Economic Retention (Memo) B. Contingency Retention (Memo) C. Potential DOW Reutilization (Memo) 20,643.1 14,454.2 1,042.6 5,146.2 0.0 0.0 5,146.2 8. Inventory on Order EOP (Memo) 7,959.3 7,943.5 15.8 0.0 42 EXHIBIT SM-4 INVENTORY STATUS === page 47 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Supply Management Inventory Status ($ in Millions) FY 2027 TOTAL Demand Based Mobilization Non-Demand Based 1. Inventory BOP 20,643.1 14,454.2 1,042.6 5,146.2 2. BOP Inventory Adjustments A. Reclassification (Memo) B. Price Change Amount (Memo) C. Adj. Inventory BOP 0.0 0.0 20,643.1 0.0 0.0 14,454.2 0.0 0.0 1,042.6 0.0 0.0 5,146.2 3. Receipts at Cost 6,167.9 6,163.6 4.3 0.0 4. Sales at Cost 7,414.7 7,414.7 0.0 0.0 5. Inventory Adjustments A. Capitalization (+ or -) B. Returns from Customers for Credit C. Returns from Customers Without Credit D. Returns to Suppliers (-) E. Transfers to Property Disposal (-) F. Issues/Receipts wo Reimbursements (+ or -) G. Other H. Total Adjustments 0.0 1,517.7 0.0 0.0 0.0 0.0 0.0 1,517.7 0.0 1,517.7 0.0 0.0 0.0 0.0 0.0 1,517.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 6. Inventory EOP 20,914.0 14,720.8 1,046.9 5,146.2 7. Inventory EOP (MAC) A. Economic Retention (Memo) B. Contingency Retention (Memo) C. Potential DOW Reutilization (Memo) 20,914.0 14,720.8 1,046.9 5,146.2 0.0 0.0 5,146.2 8. Inventory on Order EOP (Memo) 8,043.8 8,029.5 14.3 0.0 EXHIBIT SM-4 INVENTORY STATUS 43 === page 48 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Supply Management War Reserve Materiel (WRM) Stockpile ($ in Millions) FY 2025 Total 1. Inventory BOP 2. Price Change 3. Reclassification 4. Inventory Changes a. Receipts @ standard (1) Purchases (2) Returns from Customer WRM Protected 1,030.4 0.0 0.0 1,030.4 0.0 0.0 0.0 0.0 0.0 7.9 7.9 0.0 7.9 7.9 0.0 0.0 0.0 0.0 b. Issues @ standard (1) Sales (2) Returns to Suppliers (3) Disposals 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 c. Adjustments @ standard (1) Capitalizations (2) Gains and losses (3) Other Adjustments 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1,038.3 1,038.3 0.0 5. Inventory EOP STOCKPILE COSTS 1. Storage 2. Management 3. Maintenance/Other 0.0 0.0 0.0 Total Costs 0.0 1. Additional WRM 2. Replenishment WRM 3. Repair WRM 4. Assemble/Disassemble 5. Other Total Request 44 WRM Other WRM BUDGET REQUEST (OBLIGATIONS AT COST) 3.6 0.0 0.0 0.0 0.0 3.6 EXHIBIT SM-6 WAR RESERVE MATERIEL === page 49 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Supply Management War Reserve Materiel (WRM) Stockpile ($ in Millions) FY 2026 Total 1. Inventory BOP 2. Price Change 3. Reclassification 4. Inventory Changes a. Receipts @ standard (1) Purchases (2) Returns from Customer WRM Protected WRM Other 1,038.3 0.0 0.0 1,038.3 0.0 0.0 0.0 0.0 0.0 4.3 4.3 0.0 4.3 4.3 0.0 0.0 0.0 0.0 b. Issues @ standard (1) Sales (2) Returns to Suppliers (3) Disposals 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 c. Adjustments @ standard (1) Capitalizations (2) Gains and losses (3) Other Adjustments 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1,042.6 1,042.6 0.0 5. Inventory EOP STOCKPILE COSTS 1. Storage 2. Management 3. Maintenance/Other 0.0 0.0 0.0 Total Costs 0.0 1. Additional WRM 2. Replenishment WRM 3. Repair WRM 4. Assemble/Disassemble 5. Other Total Request WRM BUDGET REQUEST (OBLIGATIONS AT COST) 0.0 0.0 0.0 0.0 0.0 0.0 EXHIBIT SM-6 WAR RESERVE MATERIEL 45 === page 50 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Supply Management War Reserve Materiel (WRM) Stockpile ($ in Millions) FY 2027 Total 1. Inventory BOP 2. Price Change 3. Reclassification 4. Inventory Changes a. Receipts @ standard (1) Purchases (2) Returns from Customer WRM Protected 1,042.6 0.0 0.0 1,042.6 0.0 0.0 0.0 0.0 0.0 4.3 4.3 0.0 4.3 4.3 0.0 0.0 0.0 0.0 b. Issues @ standard (1) Sales (2) Returns to Suppliers (3) Disposals 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 c. Adjustments @ standard (1) Capitalizations (2) Gains and losses (3) Other Adjustments 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1,046.9 1,046.9 0.0 5. Inventory EOP STOCKPILE COSTS 1. Storage 2. Management 3. Maintenance/Other 0.0 0.0 0.0 Total Costs 0.0 1. Additional WRM 2. Replenishment WRM 3. Repair WRM 4. Assemble/Disassemble 5. Other Total Request 46 WRM Other WRM BUDGET REQUEST (OBLIGATIONS AT COST) 0.0 0.0 0.0 0.0 0.0 0.0 EXHIBIT SM-6 WAR RESERVE MATERIEL === page 51 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Introduction T he Industrial Operations (IO) activity group is comprised of 13 governmentowned and operated installation activities, each with unique core competencies. IO promotes business-like behavior by relying on revenue from customers instead of direct appropriations to finance continuing operations. Customers purchase services from IO activities. These services include, but are not limited to, repairing and upgrading equipment, producing weapons and munitions and storing Mission: and demilitarizing material. The goal for the IO • Provide an organic activity is to generate enough revenue to industrial capability to recover the full cost of operations while breaking conduct depot level repair even over the long term. and upgrade The core financial measures for IO are the Net • Produce munitions and Operating Result (NOR) and Accumulated large caliber weapons Operating Result (AOR). The NOR measures • Store, maintain, and the activity’s gain or loss within a single fiscal demilitarize materiel for year and is used to monitor how closely the the Department of War activity performs compared to its budget. The AOR measures the activity’s accumulated gains and losses since the fund’s inception. Rates are set during budget development to break even by bringing the AOR to zero over a budget cycle or deferring it to preserve the ability to stabilize the rate if workload is expected to decrease. This method returns accumulated gains through reduced rates and recovers accumulated losses through increased rates. The rates are set to: • • • • • Recover the activity’s costs such as payroll, supplies, contracts, equipment, inventory, depreciation, and maintenance Maintain a sufficient cash corpus to cover operating disbursements Break even over time Maintain a stable and foreseeable cost of doing business Reduce large fluctuations to the customer The IO activity relies heavily on customers funded by direct appropriations to support its operations. The activity synchronizes rates and budget assumptions with the appropriated funding levels of its customers. Reductions to customer appropriated funding requests impact the business by adversely affecting workloading decisions and projected staffing levels and may also affect equipment readiness of supported customers. 47 === page 52 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Efficiencies and Business Process Improvements Cost efficiency is an inherent attribute of the AWCF. The revolving fund construct promotes total cost visibility, full cost recovery, and fosters a business-like, competitive atmosphere. In the same way that commercial businesses focus on their bottom-line profit, IO activities focus on their Net Operating Result and other indicators to gauge the efficiency of their operations. To increase efficiency and maintain their competitive edge, IO Initiative at Letterkenny Army Depot to consolidate various air missile defense activities are fully engaged in costprograms into one primary production facility cutting and business process (U.S. Army photo by Pam Goodhart) improvement initiatives. IO customers ultimately garner the benefit of these efficiencies through reduced turn-around times, lower prices, and increased throughput. Examples include: SCL • Continuous Process Improvement (CPI): The Army Materiel Command (AMC) has been aggressively embracing the concepts of CPI since 2002. CPI is an overarching concept, using many improvement tools, including Lean Six Sigma (LSS), Value Engineering (VE), Quality Management, and others, to positively impact manufacturing, maintenance, storage, distribution and those military operations executing these critical missions. In addition, Army has received the prestigious “Class A” certification for demonstrated excellence in Sales and Operations Planning (S&OP) processes. • Shingo Award: The Shingo Prize is a globally recognized award given to organizations that demonstrate a deeply embedded culture of operational excellence, signifying the highest standard for organizational excellence in the world, where continuous improvement practices are ingrained in every aspect of the business, from leadership to employee behavior. Since FY 2005, AMC has received 31 Shingo Prizes for various programs at its depots and arsenals, including eight at Red River Army Depot (RRAD), seven at Tobyhanna Army Depot (TYAD), ten at Letterkenny Army Depot (LEAD), three at the Rock Island Arsenal-Joint Manufacturing and Technology Center (RIA-JMTC), two at Anniston Army Depot (ANAD) and one at Corpus Christi Army Depot (CCAD). • International Organization for Standardization (ISO): AMC is in the process of adopting ISO 45001, the world’s first international standard for occupational health and safety geared toward senior management. ISO 45001 has the goal of helping businesses provide a healthy and safe working environment for their 48 === page 53 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates employees and everyone else who visits the workplace. Currently, Anniston Army Depot (ANAD), Letterkenny Army Depot (LEAD), Red River Army Depot (RRAD), Rock Island Arsenal (RIA), Tobyhanna Army Depot (TYAD), Tooele Army Depot (TEAD), and Watervliet Arsenal (WVA) are ISO 45001 certified. • Safety Improvements: Safety is a high priority throughout AMC and leads to better morale, increased productivity, and reduced operational costs. Army Safety & Occupational Health Management System (ASOHMS) directed all commands to implement a safety and occupational health management system (SOHMS). Subordinate commands are at varying stages of implementation and continue implementing SOHMS. Each command can determine which of three recognized SOHMS to implement; Occupational Safety and Health Administration (OSHA’s) Voluntary Protection Program (VPP), ISO 45001, or the Army SOHMS. The Industrial Operations have two OSHA VPP recognized sites, seven ISO certified sites, and one Army SOHMS recognized site. Each site must maintain an effective safety and health management system that meets rigorous performance-based criteria and requires a total written commitment from labor to work safely. • Enterprise Resource Planning (ERP) Solutions: The Logistics Modernization Program (LMP), an ERP solution, provides the Army with logistics management capabilities and better cost performance while setting the stage for auditability. It provides real time updates and improved visibility of maintenance, production, and financial data when compared with legacy batch processes. It streamlines material/parts requisitioning and asset movements between Defense Logistics Agency (DLA) and the depots, improves visibility and accountability for inventory, improves collaboration in program planning, and shortens the time to accept and negotiate programs between the Life Cycle Management Commands (LCMCs), depots, and customers. Army is leaning forward in the next generation of ERP solutions. Army is currently in the innovation and exploration phase of Enterprise Business Systems - Convergence (EBS-C) to determine what the next version of Army systems will comprise. • Utility Savings Programs: AMC continues to implement performance-based initiatives that reduce utility consumption to lower operational costs and support Army readiness objectives. IO activities employ advanced metering systems, utility management controls, and facility-level conservation measures to improve efficiency and reduce utility expenditures. These actions result in measurable cost savings and improved resource utilization. • Modernization and Investments: The FY 2027 President’s Budget continues critical investments in the Army Organic Industrial Base (OIB) as outlined in the Secretary of the Army’s approved fifteen-year OIB Modernization Implementation Plan (OIB-MIP). This plan, spanning FY 2024 through FY 2038, aims to modernize the Army’s 23 manufacturing sites, including depots, arsenals, and ammunition facilities, to ensure readiness for future conflicts. The OIB-MIP 49 === page 54 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates focuses on transforming the OIB into a resilient, data-driven enterprise by adopting advanced technologies such as Digital Engineering (DE), Artificial Intelligence (AI), and Digital Twins. These innovations optimize operations, enhance efficiency, and ensure accountability. The Vulcan platform, a real-time decision-making tool, tracks modernization efforts across all sites, aligning resources with strategic objectives. • Advanced Analytics: The Army is implementing advanced data analytics to manage industrial and supply activities within the AWCF, leveraging the Army's Vantage platform to transform oversight and control costs. A key innovation is the Weapons System 360 (WS360) Supply Chain Risk Management Control Tower, which delivers decision-ready intelligence for critical weapons systems. For financial management, AMC is automating AWCF monthly reports using the Logistics Modernization Program (LMP) and embedded generative AI tools. This automation streamlines workload, allowing analysts to better focus on improving financial processes, data accuracy, and audit readiness, ultimately standardizing business operations across the enterprise. Functional Description The AWCF IO includes five depots, three arsenals, two munitions production facilities, and three storage sites. These sites perform the following mission functions: • • • • • Provides depot level maintenance, repair, and modernization of weapon systems and component parts Manufactures, renovates, and demilitarizes materiel Produces munitions and large caliber weapons Performs a full range of ammunition maintenance services for DOW and U.S. allies Performs ammunition receipt, storage, and issue functions In addition to the mission functions, 10 of the 13 activities provide installation base support for both internal operations and tenant activities. Corpus Christi Army Depot and Crane Army Ammunition Activity are tenants on Navy installations. The Rock Island Arsenal-Joint Manufacturing and Technology Center receives installation base support from the Army Installation Management Command (IMCOM), which is a major subordinate command of AMC. 50 === page 55 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates IO activities collaborate with the private sector through formal public-private partnership agreements to perform work or utilize facilities and equipment. Under authority granted by Title 10, United States Code, § 2474, these partnerships create opportunities for both the public and private sectors by capitalizing on each other’s strengths and efficiencies. The benefits to the Army and its customers include leveraging capacity; sustaining core Tobyhanna Army Depot engineer adjusts a maintenance capabilities; sharing of small unmanned aircraft system (sUAS) (U.S. Army photo by Tobyhanna Army Depot) overhead costs; and enhancing technical expertise in the workforce. The benefits to private industry include access to specialized facilities, equipment, and processes, and stimulating local economies. Current public-private partnership agreements are held with Boeing, General Dynamics Land Systems, Sikorsky Aircraft Corporation, and Honeywell International. The five hard-iron maintenance depots (Anniston, Corpus Christi, Letterkenny, Red River, and Tobyhanna) and Pine Bluff Arsenal, Rock Island Arsenal-Joint Manufacturing and Technology Center, Sierra Army Depot, Tooele Army Depot, and Watervliet Arsenal are designated as Centers of Industrial and Technical Excellence (CITE) for the performance of core maintenance workload in support of DOW and foreign allies. The CITE designation provides authority under Title 10, United States Code, § 2474 to partner with and lease facilities to industry on programs relating to core1 maintenance and technical expertise. Title 10, United States Code, § 2464. Core Logistics Capabilities - Government-owned and Government-operated equipment and facilities required to ensure a ready and controlled source of technical competence and resources necessary to ensure effective and timely response to a mobilization, national defense contingency situations, and other emergency requirements. 1 51 === page 56 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Activity Group Composition Figure IO 1 - Industrial Operations Activity Group Composition Army Materiel Command, located in Huntsville, Alabama, serves as the management command for the IO activity group. Installations or activities in this group fall under the direct command and control of the Life Cycle Management Commands each aligned in accordance with the nature of its mission. The following are descriptions of the IO activities and their major core mission functions. 52 === page 57 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Anniston Army Depot (ANAD) Location: Anniston, Alabama 2025 Workforce: 2,253 Description: ANAD is the Army’s only depot with the capability to maintain both heavy and light-tracked combat vehicles, excluding the Bradley. As a CITE for ground combat vehicles, assault bridging, artillery systems, rail equipment, and small arms, ANAD provides sustainment for platforms including the M1 Abrams, Stryker, and M88. The depot also services individual and crew-served weapons, ensuring readiness for deployed forces. ANAD leads in public-private partnerships with over 150 agreements, generating substantial economic impact and employment in the region. Blue Grass Army Depot (BGAD) Location: Richmond, Kentucky 2025 Workforce: 736 Description: BGAD is a key Strategic Mobility ammunition depot that provides storage, renovation, ammunition demilitarization, and issue of conventional munitions to all military services. It also manages all Army Special Operations Forces ammunition and serves as DOW’s center for handling chemical defense equipment. BGAD oversees the Anniston Munitions Center, which supports missile maintenance and conventional ammunition demilitarization operations. Corpus Christi Army Depot (CCAD) Location: Corpus Christi, Texas 2025 Workforce: 2,430 Description: CCAD is the Army’s CITE for rotary wing aircraft. It provides full-spectrum support including maintenance, overhaul, and upgrades for the Apache, Black Hawk, Chinook, and Pave Hawk platforms. CCAD serves all branches of the military, Department of Homeland Security (DHS), and foreign military partners. It leads aviation accident investigations and supports forward-deployed repair capabilities while also providing training in rotary aircraft maintenance and unmanned aircraft system platforms. Crane Army Ammunition Activity (CAAA) Location: Crane, Indiana 2025 Workforce: 987 Description: CAAA provides comprehensive munitions logistics support including storage, shipping, surveillance, renovation, and demilitarization. As a Munitions Center of Excellence, CAAA also produces pyrotechnics and fabricates key components for military use. It supports Navy countermeasure requirements and largecaliber ammunition programs. CAAA manages the Letterkenny Munitions Center 53 === page 58 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates (LEMC), which specializes in missile maintenance, testing, practice rocket production, air dominance missile repair, and demilitarization operations. Letterkenny Army Depot (LEAD) Location: Chambersburg, Pennsylvania 2025 Workforce: 1,114 Description: LEAD specializes in maintenance and modification of air defense systems, generators, shelters, and various sustainment systems. It features advanced climate-controlled facilities for electronics repair and environmental testing. LEAD capabilities include cable and harness fabrication, 3D molding, titanium welding, corrosion mitigation, and additive manufacturing. The depot supports both on-site and forward-deployed operations to maintain readiness. It is the DOW’s only organic solution for One-Stop Service for tactical missile maintenance, modification and integration. Since 2001, LEAD has been recognized by the Secretary of the Army as a Center of Industrial and Technical Excellence. McAlester Army Ammunition Plant (MCAAP) Location: McAlester, Oklahoma 2025 Workforce: 1,422 Description: MCAAP is responsible for the production, renovation, storage, shipment, and demilitarization of conventional munitions. Spanning over 45,000 acres, it includes production and renovation complexes and thousands of storage magazines. MCAAP manufactures bombs, rockets, warheads, and missiles, while also providing engineering and quality assurance services across the full munitions lifecycle. Pine Bluff Arsenal (PBA) Location: Pine Bluff, Arkansas 2025 Workforce: 571 Description: PBA specializes in the production, storage, and renovation of over 70 types of conventional munitions, including smoke, riot control, illumination, and infrared payloads. It is designated as the CITE for Chemical and Biological Defense Equipment and maintains mobile powered support systems for Soldiers. PBA actively engages in public-private partnerships to support ammunition and Chemical, Biological, Radiological, or Nuclear (CBRN) defense missions. 54 === page 59 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Red River Army Depot (RRAD) Location: Texarkana, Texas 2025 Workforce: 1,418 Description: RRAD provides global sustainment support for ground combat and tactical systems as the CITE for the Bradley Fighting Vehicle, Multiple Launch Rocket System (MLRS), tactical wheeled vehicles, and rubber products. RRAD also supports boats, cranes, engines and transmissions. The depot handles forward-deployed maintenance missions and Foreign Military Sales, delivering training and equipment sustainment for allied forces. Rock Island Arsenal-Joint Manufacturing and Technology Center (RIAJMTC) Location: Rock Island Arsenal, Illinois 2025 Workforce: 703 Description: RIA – JMTC is the DOW’s only vertically integrated metal manufacturer. It provides Computer Numerical Control (CNC) machining, forging, welding, heat treating, painting, and engineering services for a wide range of products, including gun mounts, armor kits, and mobile maintenance systems. JMTC also leads Army’s efforts in additive manufacturing, prototyping, and sustainable legacy system modernization. Sierra Army Depot (SIAD) Location: Herlong, California 2025 Workforce: 990 Description: SIAD provides critical logistics and sustainment support, including long-term storage, reset, and deployment of Army equipment. Designated as the CITE for Petroleum and Water Systems and operational project stocks, SIAD also manages redistribution of Class VII and IX materiel. It serves as the Army’s end-of-first-life center for combat and support vehicles and handles storage and management of Organizational Clothing and Individual Equipment (OCIE). Tobyhanna Army Depot (TYAD) Location: Tobyhanna, Pennsylvania 2025 Workforce: 2,236 Description: TYAD is the Army’s CITE for Command, Control, Communications, Computers, Cyber, Intelligence, Surveillance, and Reconnaissance (C5ISR) systems; including electronics and missile control components. It provides overhaul, repair, fabrication, integration, and engineering services to Joint Warfighters. TYAD supports technology upgrades, field operations, and Foreign Military Sales while offering base operations support for assigned tenant organizations and facilities. 55 === page 60 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Tooele Army Depot (TEAD) Location: Tooele, Utah 2025 Workforce: 456 Description: TEAD is DOW's Western Region Conventional Ammunition Hub and Ammunition Peculiar Equipment Center. TEAD provides Warfighter readiness through superior Ammunition Logistics and Ammunition Peculiar Equipment production/maintenance. The depot receives, stores, issues, renovates, modifies, maintains, and destroys conventional and loitering munitions for all of DOW. TEAD is designated as the Center of Industrial and Technical Excellence and the National Inventory Control Point for APE. TEAD is the life cycle engineering depot for design, development, manufacturing and fielding of munitions systems and APE throughout the world. Watervliet Arsenal (WVA) Location: Watervliet, New York 2025 Workforce: 785 Description: WVA is the Army’s premier manufacturer of large-caliber cannons and mortars. It supports full lifecycle requirements including research, prototyping, manufacturing, testing, and sustainment. WVA produces key systems such as the M1A1 Abrams main gun and maintains robust public-private partnerships to expand capacity and drive capital investment. 56 === page 61 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Budget Highlights Assumptions The budget reflects workload assumptions developed in coordination with customers and incorporates historical trend analysis when developing future workload requirements. However, as unit rotations and weapon system delivery schedules shift, annual projections can change significantly between when budgets are developed, and actual maintenance occurs. To offset these risks, the IO activity remains poised to increase or decrease output to accommodate customers’ changing requirements. Personnel Civilian end-strength represents the number of personnel employed at the end of each fiscal year. Full Time Equivalents (FTE) represent the manpower level of effort necessary to accomplish the projected workload on an annual basis. The IO labor pool includes a mix of permanent, temporary, and term-appointed employees, in addition to contract labor, which allow for workforce flexibility to accommodate changing requirements. Chart IO 1 – Personnel (excludes contractors) 18,000 15,000 12,000 9,000 6,000 3,000 0 End Strength FTE FY 2025 16,101 16,570 FY 2026 15,631 15,631 FY 2027 14,670 14,580 Maintaining a trained and ready workforce is critical to this labor-intensive business. IO activities engage in various workforce revitalization efforts to include interns, 57 === page 62 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates apprenticeship programs and a Pathways program which offers clear paths to Federal internships for students from high school through post-graduate school and to careers for recent graduates. Due to the specialized nature of the work and skill level requirements, training may require two to three years before an employee is able to perform specific tasks without supervision. The Army is focused on optimizing processes across the industrial base. Guided by its Continuous Transformation strategy and the Organic Industrial Base Modernization Implementation Plan (OIB-MIP), the U.S. Army is executing a comprehensive modernization of its industrial base to meet future threats. These initiatives prioritize the strategic alignment of resources and increased efficiency to develop and field next-generation capabilities while adapting formations, training, and warfighting concepts to the character of modern conflict. In addition to civilian personnel, 21 military personnel are assigned to IO activities in FY 2027. Direct Labor Hours (DLH) Total DLHs represent the number of hours required to complete the IO direct mission workload. DLHs decrease proportionately with the expected decline in workload. IO activities remain prepared to increase overtime and contractor DLHs in the event workload estimates increase. Chart IO 2 - Direct Labor Hours 18,000 Thousands 15,000 12,000 9,000 6,000 3,000 0 Total DLH Contractor DLH Civilian DLH - Overtime Civilian DLH - Regular 58 FY 2025 14,949 1,875 1,480 11,594 FY 2026 14,377 1,357 1,010 12,010 FY 2027 12,644 1,131 534 10,979 === page 63 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Direct Labor Hour Rate Chart IO 3 - Direct Labor Hour (DLH) Rate $400.0 Dollars $300.0 $200.0 $100.0 $0.0 Revenue Rate Unit Cost Revenue Rate Change FY 2025 238.30 336.89 2.0% FY 2026 227.15 328.33 (4.7%) FY 2027 226.29 351.46 (0.4%) The composite revenue rate is an aggregate hourly rate established in the budget cycle and used to price rate-stabilized workload. It is comprised of direct labor and material costs, overhead costs (mission indirect and non-mission indirect costs) and accumulated operating result adjustments that are designed to return gains or recover losses. In contrast to rate-stabilized workload, cost-reimbursable workload reflects prototype or low-volume repair efforts and is excluded from the stabilized rate until repair history supports its inclusion. The composite revenue rate calculation is influenced by several factors: (1) the commodity mix of workload planned (labor and material intensive or both), (2) planned gain/loss recovery across the budget cycle, (3) the volume of stabilized DLHs available to distribute overhead, and (4) the total number of DLHs supporting both stabilized and non-stabilized workload. A change to the composite revenue rate directly affects the total revenue and new order values for the budget year. The FY 2027 composite rate decreases to $226.29 per DLH, reflecting ongoing efforts to reduce indirect and overhead costs. These cost reduction measures directly support the Army’s strategic guidance to optimize the Organic Industrial Base (OIB), emphasizing the need for data-informed decision-making, business process reengineering, and cost efficiency to ensure readiness in a constrained budget environment. The Army is reducing overhead and mission indirect expenses at the depot level, sustaining the Army’s ability to meet future demand. Unlike the composite revenue rate, which incorporates the AOR and is applied to rate-stabilized workload, the unit cost per DLH captures actual total cost execution for both prior and current year orders. 59 === page 64 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Revenue and Expenses $ Millions Chart IO 4 - Revenue and Costs 6,000 5,000 4,000 3,000 2,000 1,000 0 Total Revenue Total Expenses FY 2025 5,027.8 5,036.1 FY 2026 4,707.3 4,720.3 FY 2027 4,281.5 4,444.0 The IO revenue amount represents earnings from work performed on customer equipment plus any direct appropriations designated to IO. Total expenses cover full costs, including material, labor, storage, and other direct or indirect costs associated with the products or services being provided. Revenue and expenses are displayed in more detail on Exhibit Fund 14, Revenue and Costs. Operating Result The Net Operating Result (NOR) represents the difference between revenue and expenses within a fiscal year. The recoverable Net Operating Result (NOR) includes direct appropriations in Table IO 3 - Appropriations. The Accumulated Operating Result (AOR) represents the summation of all operating gains or losses since activity group inception along with any prior period adjustments. The Recoverable NOR and AOR are displayed in the following table and on Exhibit Fund 14, Revenue and Costs. Table IO 1 - Operating Results ($ Millions) Recoverable NOR Accumulated Operating Result 60 FY 2025 123.8 (7.7) FY 2026 80.6 72.9 FY 2027 (72.9) 0.0 === page 65 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates New Orders IO activities develop workload projections based on close coordination with customers and their delivery schedule requirements. With fluid requirements and fiscal uncertainty, accurately predicting workload two to three years in advance has proven difficult. The budget includes workload assumptions that support the base program, contingency operations, and Foreign Military Sales (FMS). The projected workload in FY 2027 is commensurate with customer projections and budgeted depot maintenance requirements. Exhibit Fund 11, Source of New Orders and Revenue, displays total new order estimates by fund category. Chart IO 5 - New Orders 6,000 5,000 $ Millions 4,000 3,000 2,000 1,000 0 New Orders FY 2025 4,973.7 FY 2026 4,149.6 FY 2027 3,925.7 Carryover Carryover, or unfilled orders, represents the dollar value of the production orders (parts, labor, and overhead) that have been ordered and funded by customers but not completed by the industrial activities at the end of each fiscal year. Some carryover is necessary; it leads to better planning, better decision making, and cost efficiencies at the depots and arsenals. It provides lead time to assemble necessary workforce skill sets, to establish supply chains, and to coordinate workload routing. Carryover also prevents production line stoppages and ensures the activities have funded work to provide a smooth transition between fiscal years. The FY 2023 National Defense Authorization Act (NDAA) allows a material end of period exclusion for the Army while the FY 2024 NDAA provides an exclusion for Foreign Military Sales workload. Current policy recognizes up to seven months of carryover workload as optimal to ensure a smooth flow of maintenance 61 === page 66 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates work between fiscal years. Conversely, less than three months of carryover workload could pose execution challenges that put production continuity at risk. For FY 2027, the Army projects an end-of-year carryover of less than six months, accounting for exclusions authorized under the NDAA. The Army continues to improve carryover management through improved workload planning, acceptance, and execution. Managing Carryover The Army is focused on reducing carryover by leveraging policy and process improvements aimed at increasing production, improving customer-provider communication, and strengthening controls over the acceptance of new orders. These initiatives were developed in response to the Government Accountability Office’s FY 2013 carryover audit recommendations. The policy for accepting new workload requires: • • • • • • The customer and the executing industrial activity to assess the availability of skilled labor to execute the workload The viability of the supply chain and availability of parts The availability of tools and equipment needed during production The availability of unserviceable assets The scheduled requirements per month The availability of funding to support the production All AWCF activities have fully implemented these criteria for accepting new orders. Additionally, Army program acquisition managers are required to identify organic procurement funded requirements to the appropriate LCMC no later than the end of the first quarter of the year of execution. The Army’s goal is to ensure procurement funded depot maintenance workloads are inducted into the depots no later than the end of the second quarter of the fiscal year. The intent is to reduce orders placed late in the fiscal year that increase carryover. Army leadership is committed to monitoring carryover and production goals on a recurring basis through senior leader forums. The Army plans to reduce carryover by $238 million by the end of FY 2027. Carryover, Revenue and New Orders as they are displayed on the Exhibit Fund 11, Source of New Orders and Revenue, and Exhibit Fund 11a, Carryover Reconciliation. 62 === page 67 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Chart IO 6 - New Orders and Carryover Carryover Calculation Categories 1. Total New Orders 2. Net Carry-in Orders 3. Total Gross Orders (Lines 1 + 2) 4. Revenue 5. Material End of Period Exclusion 6. Adjusted Carryover (Line 3-Line 4 & 5) 7. Foreign Military Sales Exclusion 8. Total Carryover (Line 6 - Line 8) 9. Total Months of Carryover FY 2025 FY 2026 4,973.7 4,149.6 4,607.5 4,783.1 9,581.2 8,932.7 4,616.0 4,578.1 2,244.4 1,950.5 2,720.9 2,404.2 317.2 184.5 2,403.7 2,219.6 6.2 5.8 FY 2027 3,925.7 4,172.9 8,098.6 4,256.5 1,725.7 2,116.5 135.1 1,981.4 5.6 Performance Measurements Performance measurements for the IO activity group include Recoverable NOR and Productive Yield. FY 2025 actual results and projections for FY 2026 and FY 2027 are shown in the following table. In FY 2027, the beginning AOR is projected to be positive, and the composite rate has been reduced by consuming some of the projected AOR, resulting in a NOR loss of $72.9 million. Productive Yield represents the average number of regular DLHs for each full-time equivalent position involved in production and is an indicator of whether direct labor employees can support projected workload. The productive yield projections for FY 2026 and FY 2027 are above the expected parameters as workforce is sized to workload in FY 2026 and FY 2027. Table IO 2 - Performance Measurements Measurement/Goals FY 2025 FY 2026 FY 2027 Recoverable NOR Productive Yield 123.8 1,473 80.6 1,557 (72.9) 1,562 63 === page 68 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Appropriations Direct appropriations for IO activities are displayed in Table IO 3 - Appropriations. The Arsenal Sustainment Initiative supports competitive rates at the Army’s arsenals. Industrial Mobilization Capacity (IMC) funding sustains industrial base equipment required for mobilization that is idle for more than eighty percent in any one month but used at least once during the year. The Army requires IMC funding to sustain this equipment, enabling the OIB to rapidly surge in support of a future mobilization or increased workload such as Foreign Military Sales. The Army received $5 million in FY 2026 for Industrial Charrettes, which support planning for the development of capital investments. Table IO 3 – Appropriations ($ Millions) Arsenal Sustainment Initiative Industrial Mobilization Capacity Industrial-Focused Charrettes Total Appropriated Funds FY 2025 FY 2026 FY 2027 120.0 21.8 0.0 141.8 100.0 20.6 5.0 125.6 0.0 20.6 0.0 20.6 Collections, Disbursements, and Outlays Collections are calculated based on projected revenue and changes in accounts receivable. Disbursements are projected based on monthly operating expenses, changes in accounts payable, and Capital Investment Program obligations. Net outlays reflect the return of accumulated operating result to customers. Chart IO 7 - Cash Management $ Millions 6,000 5,000 4,000 3,000 2,000 1,000 0 Collections Disbursements 64 FY 2025 4,652.0 4,758.3 FY 2026 4,578.1 4,640.7 FY 2027 4,256.5 4,336.9 === page 69 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Minimum Capital Investment Requirement The NDAA for FY 2023 continues the supportive effort to modernize the Army’s infrastructure and increases the amount of investment required by the five Army maintenance depots (Anniston, Red River, Letterkenny, Tobyhanna, and Corpus Christi), the three arsenals (Rock Island, Pine Bluff, and Watervliet) and Tooele Army Depot to the equivalent of at least eight percent of funded workload beginning in FY 2023. The NDAA also requires that at least 2% of the total investment be from Facilities Sustainment, Modernization, and Restoration (FSRM) projects. $ Millions Chart IO 8 – Minimum Capital Investment Requirement 2,000 1,500 1,000 500 0 Investment Percentage Investment Target (8%) Actual/Request* Over / (Under) FY 2025 14.4% 276.1 495.7 219.6 FY 2026 50.1% 291.2 1,825.0 1,533.8 FY 2027 11.3% 295.3 418.7 123.5 * FY26 includes $960.5M in reconciliation funding The chart displays the total investment target and total investment amount planned. Since the minimum capital investment became law, the Army has invested over $6 billion. IO activities review future production and infrastructure requirements and project return on investment when developing capital budgets. The Army is committed to meeting the investment requirement of eight percent in each year. Exhibit Fund 6, Minimum Capital Investment Requirement provides investment details by category for each activity. 65 === page 70 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Changes in Cost of Operations ($ in Millions) Costs FY 2025 Actual 5,036.1 FY 2026 Estimate in President's Budget 4,874.7 Pricing Adjustments FY 2025 Pay Raise -Civilian Personnel -Military Personnel Materials and Supplies Other 33.0 20.8 20.6 0.2 0.3 11.9 Program Changes Labor Travel Material Equipment Transportation Depreciation Advisory and Assistance Services Other Purchased Services Other (187.3) (127.4) (7.8) (58.8) (22.4) 5.1 (0.6) (2.6) 4.9 22.3 FY 2026 Current Estimate 4,720.3 Pricing Adjustments FY 2026 Pay Raise -Civilian Personnel -Military Personnel Materials and Supplies Other 112.1 5.1 4.9 0.2 82.3 24.7 Program Changes Labor Travel Material Equipment Transportation Depreciation Advisory and Assistance Services Other Purchased Services Other (388.4) (127.0) (0.8) (164.7) (6.8) (0.1) (11.7) (5.4) (36.3) (35.8) FY 2027 Budget Estimate 66 4,444.0 EXHIBIT FUND-2 CHANGES IN THE COST OF OPERATIONS === page 71 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Minimum Capital Investment Requirement ($ Millions) FY 2025 FY 2026 FY 2027 Anniston Army Depot Average Revenue for Investment 828.0 863.5 831.0 WCF Capital Investment Program Facilities/Work Environment Equipment Modernization Processes Capital Investment Program 0.0 4.1 0.0 4.1 3.7 42.9 0.0 46.7 0.0 7.3 0.0 7.3 Operating Funds Investments Facilities/Work Environment Equipment Modernization Processes Total Operating Funds 0.0 6.7 2.6 9.2 0.0 8.1 2.5 10.6 0.0 4.1 2.2 6.3 Appropriated Funding MILCON Procurement Operations & Maintenance Total Appropriated Funding 0.0 0.0 0.0 0.0 718.5 0.0 0.0 718.5 0.0 0.0 0.0 0.0 Facilities Sustainment, Restoration and Modernization 23.0 24.1 21.9 8%- Total Actual/ Budgeted Investment 2%- FSRM Actual/ Budgeted Investment 6% Actual/ Budgeted Investment 36.3 23.0 13.3 799.8 24.1 775.7 35.6 21.9 13.7 8%- Total Required Investment 2%- FSRM Required Investment 6% Required Investment 66.2 16.6 49.7 69.1 17.3 51.8 66.5 16.6 49.9 8%- Total Investment Over/(under) Required Amount 2%- FSRM Investment Over/(under) Required Amount 6%- Investment Over/(under) Required Amount -29.9 6.4 -36.3 730.7 6.8 723.9 -30.9 5.3 -36.2 8%- Total Investment Percentage 2%- FSRM Investment Percentage 6% Investment Percentage 4.4% 2.8% 1.6% 92.6% 2.8% 89.8% 4.3% 2.6% 1.6% EXHIBIT FUND-6 MINIMUM CAPITAL INVESTMENT REQUIREMENT 67 === page 72 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Minimum Capital Investment Requirement ($ Millions) FY 2025 68 FY 2026 FY 2027 Corpus Christi Army Depot Average Revenue for Investment 716.4 752.4 767.1 WCF Capital Investment Program Facilities/Work Environment Equipment Modernization Processes Capital Investment Program 0.0 10.0 12.4 22.4 0.0 39.4 0.0 39.4 0.0 37.2 0.0 37.2 Operating Funds Investments Facilities/Work Environment Equipment Modernization Processes Total Operating Funds 0.0 28.7 0.0 28.7 0.0 10.6 0.0 10.6 0.0 7.1 0.0 7.1 Appropriated Funding MILCON Procurement Operations & Maintenance Total Appropriated Funding 0.0 0.0 7.6 7.6 60.0 79.0 113.5 252.5 0.0 0.0 55.4 55.4 Facilities Sustainment, Restoration and Modernization 13.0 12.4 8.4 8%- Total Actual/ Budgeted Investment 2%- FSRM Actual/ Budgeted Investment 6% Actual/ Budgeted Investment 71.6 13.0 58.6 314.9 12.4 302.5 108.0 8.4 99.7 8%- Total Required Investment 2%- FSRM Required Investment 6% Required Investment 57.3 14.3 43.0 60.2 15.0 45.1 61.4 15.3 46.0 8%- Total Investment Over/(under) Required Amount 2%- FSRM Investment Over/(under) Required Amount 6%- Investment Over/(under) Required Amount 14.3 -1.3 15.6 254.7 -2.6 257.3 46.7 -7.0 53.6 8%- Total Investment Percentage 2%- FSRM Investment Percentage 6% Investment Percentage 10.0% 1.8% 8.2% 41.8% 1.7% 40.2% 14.1% 1.1% 13.0% EXHIBIT FUND-6 MINIMUM CAPITAL INVESTMENT REQUIREMENT === page 73 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Minimum Capital Investment Requirement ($ Millions) FY 2025 FY 2026 FY 2027 Letterkenny Army Depot Average Revenue for Investment 386.4 393.4 422.6 WCF Capital Investment Program Facilities/Work Environment Equipment Modernization Processes Capital Investment Program 2.2 23.1 0.0 25.3 0.0 11.0 0.0 11.0 0.0 6.8 0.0 6.8 Operating Funds Investments Facilities/Work Environment Equipment Modernization Processes Total Operating Funds 0.0 2.3 0.0 2.3 0.0 0.0 0.0 0.0 0.0 1.9 0.0 1.9 Appropriated Funding MILCON Procurement Operations & Maintenance Total Appropriated Funding 152.0 0.0 14.1 166.1 91.5 0.0 12.0 103.5 0.0 0.0 0.0 0.0 5.0 6.8 6.9 8%- Total Actual/ Budgeted Investment 2%- FSRM Actual/ Budgeted Investment 6% Actual/ Budgeted Investment 198.7 5.0 193.7 121.3 6.8 114.5 15.6 6.9 8.7 8%- Total Required Investment 2%- FSRM Required Investment 6% Required Investment 30.9 7.7 23.2 31.5 7.9 23.6 33.8 8.5 25.4 8%- Total Investment Over/(under) Required Amount 2%- FSRM Investment Over/(under) Required Amount 6%- Investment Over/(under) Required Amount 167.7 -2.8 170.5 89.9 -1.0 90.9 -18.2 -1.5 -16.7 8%- Total Investment Percentage 2%- FSRM Investment Percentage 6% Investment Percentage 51.4% 1.3% 50.1% 30.8% 1.7% 29.1% 3.7% 1.6% 2.0% Facilities Sustainment, Restoration and Modernization EXHIBIT FUND-6 MINIMUM CAPITAL INVESTMENT REQUIREMENT 69 === page 74 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Minimum Capital Investment Requirement ($ Millions) FY 2025 70 FY 2026 FY 2027 Red River Army Depot Average Revenue for Investment 465.1 541.7 584.7 WCF Capital Investment Program Facilities/Work Environment Equipment Modernization Processes Capital Investment Program 0.0 1.1 0.0 1.1 0.0 0.0 0.0 0.0 0.0 1.3 0.0 1.3 Operating Funds Investments Facilities/Work Environment Equipment Modernization Processes Total Operating Funds 0.1 4.6 0.0 4.7 0.0 8.2 0.0 8.2 0.0 8.6 0.0 8.6 Appropriated Funding MILCON Procurement Operations & Maintenance Total Appropriated Funding 34.0 0.0 0.0 34.0 93.0 0.0 0.0 93.0 0.0 0.0 0.0 0.0 Facilities Sustainment, Restoration and Modernization 12.3 19.7 19.5 8%- Total Actual/ Budgeted Investment 2%- FSRM Actual/ Budgeted Investment 6% Actual/ Budgeted Investment 52.1 12.3 39.7 120.9 19.7 101.2 29.3 19.5 9.8 8%- Total Required Investment 2%- FSRM Required Investment 6% Required Investment 37.2 9.3 27.9 43.3 10.8 32.5 46.8 11.7 35.1 8%- Total Investment Over/(under) Required Amount 2%- FSRM Investment Over/(under) Required Amount 6%- Investment Over/(under) Required Amount 14.9 3.0 11.8 77.5 8.8 68.7 -17.4 7.8 -25.3 8%- Total Investment Percentage 2%- FSRM Investment Percentage 6% Investment Percentage 11.2% 2.7% 8.5% 22.3% 3.6% 18.7% 5.0% 3.3% 1.7% EXHIBIT FUND-6 MINIMUM CAPITAL INVESTMENT REQUIREMENT === page 75 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Minimum Capital Investment Requirement ($ Millions) FY 2025 FY 2026 FY 2027 Tobyhanna Army Depot Average Revenue for Investment 510.5 515.4 523.8 WCF Capital Investment Program Facilities/Work Environment Equipment Modernization Processes Capital Investment Program 0.0 2.7 2.8 5.5 0.0 7.0 0.0 7.0 0.0 0.3 0.0 0.3 Operating Funds Investments Facilities/Work Environment Equipment Modernization Processes Total Operating Funds 2.5 6.2 1.2 9.9 5.3 5.1 2.1 12.6 5.3 5.1 2.1 12.6 Appropriated Funding MILCON Procurement Operations & Maintenance Total Appropriated Funding 0.0 0.0 3.0 3.0 68.0 0.0 68.0 136.0 0.0 0.0 35.0 35.0 Facilities Sustainment, Restoration and Modernization 10.6 11.3 11.5 8%- Total Actual/ Budgeted Investment 2%- FSRM Actual/ Budgeted Investment 6% Actual/ Budgeted Investment 29.0 10.6 18.3 166.9 11.3 155.6 59.4 11.5 47.9 8%- Total Required Investment 2%- FSRM Required Investment 6% Required Investment 40.8 10.2 30.6 41.2 10.3 30.9 41.9 10.5 31.4 8%- Total Investment Over/(under) Required Amount 2%- FSRM Investment Over/(under) Required Amount 6%- Investment Over/(under) Required Amount -11.9 0.4 -12.3 125.7 1.0 124.7 17.5 1.0 16.4 8%- Total Investment Percentage 2%- FSRM Investment Percentage 6% Investment Percentage 5.7% 2.1% 3.6% 32.4% 2.2% 30.2% 11.3% 2.2% 9.1% EXHIBIT FUND-6 MINIMUM CAPITAL INVESTMENT REQUIREMENT 71 === page 76 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Minimum Capital Investment Requirement ($ Millions) FY 2025 72 FY 2026 FY 2027 Pine Bluff Arsenal Average Revenue for Investment 115.6 125.8 128.1 WCF Capital Investment Program Facilities/Work Environment Equipment Modernization Processes Capital Investment Program 0.0 2.3 0.0 2.3 0.0 16.1 0.0 16.1 0.0 0.0 0.0 0.0 Operating Funds Investments Facilities/Work Environment Equipment Modernization Processes Total Operating Funds 0.7 0.0 0.0 0.7 2.3 0.0 0.0 2.3 2.9 0.0 0.0 2.9 Appropriated Funding MILCON Procurement Operations & Maintenance Total Appropriated Funding 0.0 0.0 0.0 0.0 118.0 0.0 0.0 118.0 0.0 0.0 0.0 0.0 Facilities Sustainment, Restoration and Modernization 9.3 14.1 14.3 8%- Total Actual/ Budgeted Investment 2%- FSRM Actual/ Budgeted Investment 6% Actual/ Budgeted Investment 12.3 9.3 3.0 150.5 14.1 136.3 17.1 14.3 2.9 8%- Total Required Investment 2%- FSRM Required Investment 6% Required Investment 9.2 2.3 6.9 10.1 2.5 7.5 10.3 2.6 7.7 8%- Total Investment Over/(under) Required Amount 2%- FSRM Investment Over/(under) Required Amount 6%- Investment Over/(under) Required Amount 3.1 7.0 -3.9 140.4 11.6 128.8 6.9 11.7 -4.8 8%- Total Investment Percentage 2%- FSRM Investment Percentage 6% Investment Percentage 10.7% 8.1% 2.6% 119.6% 11.2% 108.4% 13.4% 11.1% 2.2% EXHIBIT FUND-6 MINIMUM CAPITAL INVESTMENT REQUIREMENT === page 77 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Minimum Capital Investment Requirement ($ Millions) FY 2025 FY 2026 FY 2027 Rock Island Arsenal Average Revenue for Investment 151.4 158.3 143.6 WCF Capital Investment Program Facilities/Work Environment Equipment Modernization Processes Capital Investment Program 0.0 6.3 0.0 6.3 0.0 6.3 0.0 6.3 0.0 10.1 0.0 10.1 Operating Funds Investments Facilities/Work Environment Equipment Modernization Processes Total Operating Funds 10.9 2.9 0.0 13.9 8.1 2.4 0.0 10.5 7.8 2.3 0.0 10.1 Appropriated Funding MILCON Procurement Operations & Maintenance Total Appropriated Funding 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Facilities Sustainment, Restoration and Modernization 0.0 0.0 0.0 8%- Total Actual/ Budgeted Investment 2%- FSRM Actual/ Budgeted Investment 6% Actual/ Budgeted Investment 20.2 0.0 20.2 16.8 0.0 16.8 20.2 0.0 20.2 8%- Total Required Investment 2%- FSRM Required Investment 6% Required Investment 12.1 3.0 9.1 12.7 3.2 9.5 11.5 2.9 8.6 8%- Total Investment Over/(under) Required Amount 2%- FSRM Investment Over/(under) Required Amount 6%- Investment Over/(under) Required Amount 8.1 -3.0 11.1 4.1 -3.2 7.3 8.7 -2.9 11.6 8%- Total Investment Percentage 2%- FSRM Investment Percentage 6% Investment Percentage 13.3% 0.0% 13.3% 10.6% 0.0% 10.6% 14.1% 0.0% 14.1% EXHIBIT FUND-6 MINIMUM CAPITAL INVESTMENT REQUIREMENT 73 === page 78 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Minimum Capital Investment Requirement ($ Millions) FY 2025 74 FY 2026 FY 2027 Watervliet Arsenal Average Revenue for Investment 211.2 217.9 213.7 WCF Capital Investment Program Facilities/Work Environment Equipment Modernization Processes Capital Investment Program 1.3 0.0 0.0 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Operating Funds Investments Facilities/Work Environment Equipment Modernization Processes Total Operating Funds 0.0 0.0 0.0 0.0 5.5 0.0 0.0 5.5 5.0 0.5 0.0 5.5 Appropriated Funding MILCON Procurement Operations & Maintenance Total Appropriated Funding 53.0 0.0 1.6 54.6 29.0 62.6 23.6 115.2 0.0 49.7 62.0 111.7 Facilities Sustainment, Restoration and Modernization 14.5 5.5 5.0 8%- Total Actual/ Budgeted Investment 2%- FSRM Actual/ Budgeted Investment 6% Actual/ Budgeted Investment 70.4 14.5 55.8 126.2 5.5 120.7 122.2 5.0 117.2 8%- Total Required Investment 2%- FSRM Required Investment 6% Required Investment 16.9 4.2 12.7 17.4 4.4 13.1 17.1 4.3 12.8 8%- Total Investment Over/(under) Required Amount 2%- FSRM Investment Over/(under) Required Amount 6%- Investment Over/(under) Required Amount 53.5 10.3 43.2 108.8 1.1 107.6 105.1 0.7 104.4 8%- Total Investment Percentage 2%- FSRM Investment Percentage 6% Investment Percentage 33.3% 6.9% 26.4% 57.9% 2.5% 55.4% 57.2% 2.3% 54.9% EXHIBIT FUND-6 MINIMUM CAPITAL INVESTMENT REQUIREMENT === page 79 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Minimum Capital Investment Requirement ($ Millions) FY 2025 FY 2026 FY 2027 Tooele Army Depot Average Revenue for Investment 66.2 71.5 76.3 WCF Capital Investment Program Facilities/Work Environment Equipment Modernization Processes Capital Investment Program 0.0 0.4 0.0 0.4 0.0 0.0 0.0 0.0 4.0 1.0 0.0 5.0 Operating Funds Investments Facilities/Work Environment Equipment Modernization Processes Total Operating Funds 0.0 0.0 0.0 0.0 0.2 0.0 0.0 0.2 0.0 0.0 0.0 0.0 Appropriated Funding MILCON Procurement Operations & Maintenance Total Appropriated Funding 0.0 0.0 0.0 0.0 0.0 0.0 1.2 1.2 0.0 0.0 0.0 0.0 Facilities Sustainment, Restoration and Modernization 4.8 6.3 6.3 8%- Total Actual/ Budgeted Investment 2%- FSRM Actual/ Budgeted Investment 6% Actual/ Budgeted Investment 5.2 4.8 0.4 7.7 6.3 1.4 11.3 6.3 5.0 8%- Total Required Investment 2%- FSRM Required Investment 6% Required Investment 5.3 1.3 4.0 5.7 1.4 4.3 6.1 1.5 4.6 8%- Total Investment Over/(under) Required Amount 2%- FSRM Investment Over/(under) Required Amount 6%- Investment Over/(under) Required Amount -0.1 3.4 -3.6 2.0 4.9 -2.9 5.2 4.8 0.4 8%- Total Investment Percentage 2%- FSRM Investment Percentage 6% Investment Percentage 7.8% 7.2% 0.6% 10.8% 8.8% 2.0% 14.8% 8.2% 6.6% EXHIBIT FUND-6 MINIMUM CAPITAL INVESTMENT REQUIREMENT 75 === page 80 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Minimum Capital Investment Requirement ($ Millions) FY 2025 FY 2026 Total Army ($M) Average Revenue for Investment 3,450.9 3,640.0 3,690.9 WCF Capital Investment Program Facilities/Work Environment Equipment Modernization Processes Capital Investment Program 3.4 49.9 15.2 68.5 3.7 122.7 0.0 126.4 4.0 63.9 0.0 67.9 Operating Funds Investments Facilities/Work Environment Equipment Modernization Processes Total Operating Funds 14.3 51.4 3.8 69.4 21.4 34.4 4.6 60.4 21.0 29.6 4.3 54.9 Appropriated Funding* MILCON Procurement Operations & Maintenance Total Appropriated Funding 239.0 0.0 26.2 265.2 1,178.0 141.6 218.3 1,537.9 0.0 49.7 152.4 202.1 Facilities Sustainment, Restoration and Modernization 92.5 100.2 93.8 8%- Total Actual/ Budgeted Investment 2%- FSRM Actual/ Budgeted Investment 6% Actual/ Budgeted Investment 495.7 92.5 403.2 1,825.0 100.2 1,724.7 418.7 93.8 325.0 8%- Total Required Investment 2%- FSRM Required Investment 6% Required Investment 276.1 69.0 207.1 291.2 72.8 218.4 295.3 73.8 221.5 8%- Total Investment Over/(under) Required Amount 2%- FSRM Investment Over/(under) Required Amount 6%- Investment Over/(under) Required Amount 219.6 23.5 196.1 1,533.8 27.4 1,506.3 123.5 19.9 103.5 8%- Total Investment Percentage 2%- FSRM Investment Percentage 6% Investment Percentage Actual/ Budgeted Investment Required Investment Investment Over / (Under) Required Amount Investment Percentage 14.4% 2.7% 11.7% 495.7 276.1 219.6 14.4% 50.1% 2.8% 47.4% 1,825.0 291.2 1,533.8 50.1% 11.3% 2.5% 8.8% 418.7 295.3 123.5 11.3% * Includes FY26 Reconciliation funding 76 FY 2027 EXHIBIT FUND-6 MINIMUM CAPITAL INVESTMENT REQUIREMENT === page 81 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Source of New Orders and Revenue ($ in Millions) FY 2025 FY 2026 FY 2027 Orders from DoW Components: Department of Army Operations & Maintenance, Army Operations & Maintenance, ARNG Operations & Maintenance, AR Subtotal, O&M: 1,042.1 114.2 44.7 1,201.0 1,064.7 120.8 30.8 1,216.3 1,026.3 127.1 30.2 1,183.6 Aircraft Procurement Missile Procurement Weapons & Tracked Combat Vehicles Procurement of Ammunition Other Procurement Subtotal, Procurement: 18.0 45.5 259.0 177.6 283.4 783.4 2.1 19.3 270.8 204.0 296.3 792.5 0.4 17.8 231.8 141.8 275.1 666.9 RDTE BRAC Family Housing Military Construction Chem Agents & Munitions Dest, Army Other Subtotal, Other Army: 59.6 0.2 0.2 0.0 0.0 0.3 60.3 23.5 0.1 0.7 0.0 0.0 0.1 24.5 10.6 0.1 0.8 0.0 0.0 0.1 11.5 Subtotal, Department of Army: 2,044.7 2,033.2 1,862.0 Department of Air Force O&M Department of Air Force Investment Department of Navy O&M Department of Navy Investment US Marines O&M US Marines Investment Other Department of War Subtotal, Other DoW Services: 149.8 45.4 64.8 5.0 48.2 5.0 139.4 457.7 119.2 73.9 59.9 23.7 33.1 8.9 113.1 431.8 124.7 42.3 58.0 19.3 31.1 6.7 99.1 381.3 Industrial Operations, Army Supply Management, Army Supply Management, Air Force Supply Management, Navy Supply Management, Marine Corps DECA DFAS DISA DLA TRANSCOM Other Subtotal, DWCF: 60.0 1,495.8 66.8 24.2 2.9 0.1 0.4 1.0 23.0 0.0 0.9 1,675.0 17.8 1,400.9 48.2 35.6 0.0 0.1 0.3 0.1 14.4 0.0 0.0 1,517.3 16.6 1,428.8 47.9 33.5 0.0 0.1 0.3 0.1 16.0 0.1 0.0 1,543.3 c. Total DoW 4,177.3 3,982.4 3,786.6 d. Other Orders: Other Federal Agencies Foreign Military Sales Trust Fund Nonappropriated Non-Federal Agencies Subtotal, Other Orders: 2.8 621.7 0.0 0.3 171.6 796.4 2.0 50.0 0.0 0.1 115.1 167.3 2.6 62.0 0.0 0.7 73.9 139.1 Total New Orders: 4,973.7 4,149.6 3,925.7 1. New Orders a. b. DWCF: EXHIBIT FUND-11 SOURCE OF NEW ORDERS AND REVENUE 77 === page 82 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Carryover Calculation Summary ($ in Millions) A. Carryover Summary FY 2025 FY 2026 FY 2027 1. Gross Carry-In Adjustments to Prior Year Orders Net Carry-In 5,193.3 (585.8) 4,607.5 4,965.2 (182.2) 4,783.1 4,354.6 (181.7) 4,172.9 2. New Orders 4,973.7 4,149.6 3,925.7 3. Total Gross Orders (Lines 1 + 2) 9,581.2 8,932.7 8,098.6 4. Revenue (Gross Sales) 5. Material End of Period Exclusion 4,616.0 4,965.2 2,244.4 4,578.1 4,354.6 1,950.5 4,256.5 3,842.2 1,725.7 6. Adjusted Carryover (Line 3 - Line 4 & 5) 2,720.9 2,404.2 2,116.5 317.2 184.5 135.1 2,403.7 6.2 2,219.6 5.8 1,981.4 5.6 7. Foreign Military Sales (FMS) 8. Total Carryover (Line 6 - Line 7) Months of Carryover (Line 6 / (Line 4/ 12)) 78 EXHIBIT FUND-11A CARRYOVER CALCULATION SUMMARY === page 83 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Carryover Calculation Summary ($ in Millions) B. Carryover by Installation with Exclusions FY 2025 FY 2026 Value ($M) 205.3 281.3 213.6 278.6 312.3 1,291.1 Months 3.2 3.7 5.3 5.7 7.0 5.0 FY 2027 Depots Anniston Army Depot Corpus Christi Army Depot Letterkenny Army Depot Red River Army Depot Tobyhanna Army Depot Total Months 2.9 4.1 6.0 5.3 7.1 5.1 Value ($M) 217.6 205.9 188.8 325.0 314.7 1,251.9 Months 4.4 2.6 5.2 4.9 6.2 4.7 Value ($M) 216.4 132.0 182.1 243.0 293.5 1,067.0 Arsenals Pine Bluff Arsenal Rock Island Arsenal Watervliet Arsenal Total FY 2025 Months Value ($M) 19.5 192.1 6.6 74.7 16.0 284.3 14.0 551.1 FY 2026 Months Value ($M) 17.3 201.2 4.9 61.0 9.6 183.0 10.6 445.2 FY 2027 Months Value ($M) 16.9 192.4 3.9 51.3 12.3 239.2 11.0 482.9 Ammo Plants Blue Grass Army Depot Crane Army Ammunition Activity McAlester Army Ammunition Plant FY 2025 Months Value ($M) 3.8 43.1 9.9 208.3 11.2 247.2 FY 2026 Months Value ($M) 3.7 38.6 8.7 197.2 10.2 212.0 FY 2027 Months Value ($M) 4.4 36.4 7.5 164.7 7.2 154.8 Tooele Army Depot 4.9 30.3 4.4 29.5 4.6 29.5 Sierra Army Depot Total 2.1 6.4 32.5 561.4 2.7 6.0 45.2 522.4 2.7 5.3 46.2 431.6 EXHIBIT FUND-11A CARRYOVER CALCULATION SUMMARY 79 === page 84 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Carryover Calculation Summary ($ in Millions) C. Raw Carryover Dollar Value by Appropriation FY 2025 Army Operation and Maintenance Procurement Other Army (RDT&E, BRAC, Family Housing, MILCON, etc.) AWCF (Industrial Operations and Supply Management) 80 FY 2026 FY 2027 1,180.2 1,082.7 35.8 884.4 1,103.9 1,054.4 27.8 865.9 1,046.2 1,026.9 28.5 657.4 Other Service (O&M, Investment, WCF) Air Force Navy Marine Corps Other DOW and Federal Agencies 501.6 108.1 118.5 161.7 433.1 127.1 85.0 139.4 366.4 123.1 69.8 128.8 Other DWCF DECA/DFAS/DISA/DLA, etc 14.7 10.1 11.3 Non-DOW Agencies FMS, Non-FED, etc 877.5 507.9 383.8 Raw Carryover Raw Carryover with Adjustments for Prior Year Orders (Part A #1) 4,965.2 4,965.2 4,354.6 4,172.4 3,842.2 3,478.3 Adjustments for Prior period and Exclusions (Reductions to Part C) Prior year Adjustments Material EOP Exclusion FMS Exclusion Total Adjustments (585.8) (2,244.4) (317.2) (2,561.6) (182.2) (1,950.5) (184.5) (2,135.0) (363.9) (1,725.7) (135.1) (1,860.8) Total Adjusted Carryover (reconciles with #8 Part A). 2,403.7 2,219.6 1,981.4 EXHIBIT FUND-11A CARRYOVER CALCULATION SUMMARY === page 85 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Revenue and Costs ($ in Millions) FY 2025 Revenue Gross Sales: Operations Surcharges Depreciation excluding Major Construction Major Construction Depreciation Other Income (DWCF Direct Appropriation) Other Income (Misc Gains/losses) Other Income (Other) FY 2026 FY 2027 4,616.0 4,455.4 0.0 160.6 0.0 141.8 28.4 241.6 4,578.1 4,418.5 0.0 159.6 0.0 125.6 0.0 3.6 4,256.5 4,108.5 0.0 147.9 0.0 20.6 0.0 4.5 Total Income: 5,027.8 4,707.3 4,281.5 Salaries and Wages: Military Personnel Compensation & Benefits Civilian Personnel Compensation & Benefits Travel & Transportation of Personnel Materials & Supplies (For Internal Operations) Equipment Other Purchases from Revolving Funds Transportation of Things Depreciation Printing and Reproduction Advisory and Assistance Services Rent, Communication, Utilities, & Misc. Charges Other Purchased Services 2,073.2 3.7 2,069.5 28.9 1,690.7 63.3 59.3 9.4 160.6 1.1 14.6 105.0 829.8 1,962.7 4.8 1,957.8 25.0 1,590.2 58.2 87.0 12.1 159.6 1.2 34.5 146.8 643.0 1,840.8 4.6 1,836.1 24.7 1,507.8 52.6 88.7 12.3 147.9 1.2 29.8 117.9 620.2 Total Costs: 5,036.1 4,720.3 4,444.0 (8.4) (13.0) (162.4) Plus Appropriations Affecting NOR/AOR Other Changes Affecting NOR: Non-Recoverable Expenses (Unfunded Costs) Non-Recoverable Expenses (Inventory Losses) Non-Recoverable Expenses (FRM) 132.2 107.9 (4.5) 28.8 93.7 93.7 0.0 0.0 89.5 89.5 0.0 0.0 Recoverable Net Operating Result 123.8 80.6 (72.9) (131.5) 0.0 (131.5) 123.8 (7.7) 72.9 (7.7) 80.6 72.9 (72.9) (7.7) 72.9 0.0 Costs Operating Result Other Changes Affecting AOR a. AOR Beginning of Year (Unadjusted) b. +/- Prior Year Adjustments c. Equals AOR BOY (Adjusted) d. +/- Net Operating Result e. Deferred AOR f. Equals Recoverable AOR EOP EXHIBIT FUND-14 REVENUE AND COSTS 81 === page 86 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Fuel Data FY 2025 FUEL PROCUREMENT BARRELS (millions) 0.000 0.000 PRODUCT AVGAS (CONUS) AVGAS (OCONUS) Diesel Fuel: COST PER EXTENDED BARREL PRICE ($) ($ millions) $165.48 0.000 $651.42 0.000 Distillates- F76 High Sulfur- DF1 Generic (High Sulfur)- DF2 Ultra Low Sulfur- DS1 Ultra Low Sulfur- DS2 Burner Grade- FS1 Burner Grade- FS2 Biodiesel- BDI 0.000 0.000 0.000 0.006 0.021 0.004 0.001 0.004 $146.58 $145.74 $130.62 $148.68 $141.12 $142.38 $126.00 $141.12 0.000 0.000 0.000 0.837 3.022 0.501 0.097 0.227 JP8 & JA1 JAA JP5 JPTS Kerosene- KS1 0.000 0.010 0.000 0.000 0.000 $145.74 $144.90 $147.00 $202.86 $143.22 0.000 1.485 0.004 0.000 0.000 Regular, Unleaded- MUR Midgrade, Unleaded- MUM Premium, Unleaded- MUP Gasohol- GUM Ethanol- E85 0.007 0.000 0.000 0.000 0.000 $142.38 $151.20 $168.00 $151.20 $142.38 0.983 0.000 0.000 0.000 0.008 Burner Grade- FS4 Residual (Burner Grade)- FS6 FOR Bunkers Marine- MGO Bunkers Intermediate Grade- 180, 380 Into Plane Jet Fuel- IAI, IAA, IAB, IP8 Local Purchase Jet Fuel- NA1, NAA Local Purchase Ground Fuel- NLS, NMU Propane TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.005 0.057 $93.24 $73.50 $39.90 $149.94 $110.04 $165.48 $178.50 $152.46 $160.86 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.027 0.059 7.251 Jet Fuel: Motor Gasoline: Residual: 82 EXHIBIT FUND-15 FUEL DATA === page 87 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Fuel Data FY 2026 FUEL PROCUREMENT BARRELS (millions) 0.000 0.000 PRODUCT AVGAS (CONUS) AVGAS (OCONUS) Diesel Fuel: COST PER EXTENDED BARREL PRICE ($) ($ millions) $175.56 0.000 $688.80 0.000 Distillates- F76 High Sulfur- DF1 Generic (High Sulfur)- DF2 Ultra Low Sulfur- DS1 Ultra Low Sulfur- DS2 Burner Grade- FS1 Burner Grade- FS2 Biodiesel- BDI 0.000 0.000 0.000 0.000 0.000 0.005 0.028 0.001 $154.98 $154.14 $138.18 $157.08 $149.52 $150.78 $133.14 $149.52 0.000 0.000 0.000 0.000 0.004 0.796 3.710 0.213 JP8 & JA1 JAA JP5 JPTS Kerosene- KS1 0.001 0.000 0.000 0.006 0.000 $154.14 $153.30 $155.40 $214.62 $151.62 0.230 0.055 0.005 1.280 0.010 Regular, Unleaded- MUR Midgrade, Unleaded- MUM Premium, Unleaded- MUP Ethanol- E85 0.000 0.000 0.006 0.000 $150.78 $159.60 $178.08 $150.78 0.002 0.000 1.040 0.008 Burner Grade- FS4 Residual (Burner Grade)- FS6 FOR Bunkers Marine- MGO Bunkers Intermediate Grade- 180, 380 Into Plane Jet Fuel- IAI, IAA, IAB, IP8 Local Purchase Jet Fuel- NA1, NAA Local Purchase Ground Fuel- NLS, NMU TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.049 $98.70 $78.12 $39.90 $158.34 $116.34 $175.56 $188.58 $161.28 0.010 0.000 0.000 0.000 0.000 0.000 0.000 0.030 7.392 Jet Fuel: Motor Gasoline: Residual: EXHIBIT FUND-15 FUEL DATA 83 === page 88 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Fuel Data FY 2027 FUEL PROCUREMENT BARRELS (millions) 0.000 0.000 PRODUCT AVGAS (CONUS) AVGAS (OCONUS) Diesel Fuel: COST PER EXTENDED BARREL PRICE ($) ($ millions) $171.78 0.000 $675.78 0.000 Distillates- F76 High Sulfur- DF1 Generic (High Sulfur)- DF2 Ultra Low Sulfur- DS1 Ultra Low Sulfur- DS2 Burner Grade- FS1 Burner Grade- FS2 Biodiesel- BDI 0.000 0.000 0.000 0.005 0.021 0.001 0.001 0.004 $152.04 $151.20 $135.66 $154.14 $146.58 $147.84 $130.62 $146.58 0.000 0.000 0.000 0.819 3.115 0.216 0.101 0.513 JP8 & JA1 JAA JP5 JPTS Kerosene- KS1 0.000 0.008 0.000 0.000 0.000 $151.20 $150.36 $152.46 $210.42 $148.26 0.000 1.199 0.005 0.000 0.000 Regular, Unleaded- MUR Midgrade, Unleaded- MUM Premium, Unleaded- MUP Ethanol- E85 0.004 0.000 0.000 0.000 $147.84 $156.66 $174.72 $147.84 0.661 0.000 0.000 0.008 Burner Grade- FS4 Residual (Burner Grade)- FS6 FOR Bunkers Marine- MGO Bunkers Intermediate Grade- 180, 380 Into Plane Jet Fuel- IAI, IAA, IAB, IP8 Local Purchase Jet Fuel- NA1, NAA Local Purchase Ground Fuel- NLS, NMU TOTAL 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.001 0.046 $96.60 $76.02 $39.90 $155.40 $114.66 $171.78 $185.22 $158.34 0.030 0.000 0.000 0.000 0.000 0.000 0.000 0.169 6.837 Jet Fuel: Motor Gasoline: Residual: 84 EXHIBIT FUND-15 FUEL DATA === page 89 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Material Inventory Data ($ in Millions) FY 2025 Material Inventory BOP Total 1,047.2 Purchases A. Purchases to Support Customer Orders (+) B. Purchase of long lead items in advance of customer orders (+) C. Other Purchases (list) (+) D. Total Purchases 1,262.3 0.0 0.0 1,262.3 Material Inventory Adjustments A. Material Used in Maintenance (and billed/charged to customer orders) (-) B. Disposals, theft, losses due to damages (-) C. Other reductions (list) (-) D. IO to SMA Transfer E. Total inventory adjustments Material Inventory EOP Mobilization Operating 1,047.2 0.0 1,262.3 0.0 0.0 1,262.3 1,202.5 0.5 0.0 0.0 1,203.1 0.0 1,202.5 0.5 0.0 0.0 1,203.1 1,106.5 0.0 1,106.5 Total 1,106.5 Mobilization 0.0 Operating 1,106.5 0.0 983.8 0.0 0.0 983.8 FY 2026 Material Inventory BOP Purchases A. Purchases to Support Customer Orders (+) B. Purchase of long lead items in advance of customer orders (+) C. Other Purchases (list) (+) D. Total Purchases 983.8 0.0 0.0 983.8 Material Inventory Adjustments A. Material Used in Maintenance (and billed/charged to customer orders) (-) B. Disposals, theft, losses due to damages (-) C. Other reductions (list) (-) D. IO to SMA Transfer E. Total inventory adjustments 1,017.3 (23.5) 5.0 0.0 998.8 0.0 1,017.3 (23.5) 5.0 0.0 998.8 Material Inventory EOP 1,091.5 0.0 1,091.5 Total 1,091.5 Mobilization 0.0 Operating 1,091.5 0.0 960.1 0.0 0.0 960.1 FY 2027 Material Inventory BOP Purchases A. Purchases to Support Customer Orders (+) B. Purchase of long lead items in advance of customer orders (+) C. Other Purchases (list) (+) D. Total Purchases 960.1 0.0 0.0 960.1 Material Inventory Adjustments A. Material Used in Maintenance (and billed/charged to customer orders) (-) B. Disposals, theft, losses due to damages (-) C. Other reductions (list) (-) D. IO to SMA Transfer E. Total inventory adjustments 1,043.0 (24.6) 5.2 0.0 1,023.5 0.0 1,043.0 (24.6) 5.2 0.0 1,023.5 Material Inventory EOP 1,028.0 0.0 1,028.0 EXHIBIT FUND-16 MATERIAL INVENTORY DATA 85 === page 90 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates Capital Budget Introduction T he primary goal of the Capital Investment Program (CIP) within the AWCF is to establish a capability for reinvestment in the infrastructure of business areas to improve product and service quality and timeliness, reduce costs, and foster state-of-the-art business operations. The CIP provides the framework for planning, coordinating, and controlling AWCF resources and expenditures to obtain capital assets. Included in the capital budget are the following types of assets: automated data processing equipment (ADPE), non-ADPE equipment; automated data processing software, whether developed internally or externally, and minor construction. The capital budget justifies the purchase of assets with a unit cost that is greater than or equal to $250,000 and have a useful life of two or more years. Headquarters, Army Materiel Command, conducts a thorough vetting process to ensure capital projects deliver a positive return on investment and comply with strategic plans for each industrial facility. Capital projects within the Industrial Operations enterprise focus primarily on replacing and upgrading equipment. In contract, Supply Management enterprise focuses solely on software development in support of the Logistics Modernization Program. Capital budget obligation authority is displayed in the following exhibits: Fund 9a, Capital Investment Summary; Fund 9b, Capital Purchase Justification; and Fund 9c, Capital Budget Execution. The following table shows the Supply Management capital budget and associated cash outlays. Table CIP 1 - Supply Management Capital Budget ($ Millions) Software Capital Cash Outlays 86 FY 2025 10.7 13.3 FY 2026 15.5 15.3 FY 2027 23.6 19.4 === page 91 === Army Working Capital Fund (AWCF) Fiscal Year (FY) 2027 Budget Estimates The following table shows categories and respective values of the Industrial Operations capital budget and the projected capital cash outlays. Table CIP 2 - Industrial Operations Capital Budget ($ Millions) Equipment ADPE & Telecommunications Software Minor Construction Total CIP Capital Cash Outlays FY 2025 51.6 2.8 4.0 1.3 59.7 75.4 FY 2026 108.5 20.1 6.8 3.7 139.0 95.0 FY 2027 70.2 0.0 10.1 4.0 84.3 104.3 Note: Numbers may not add due to rounding. 87 === page 92 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Supply Management Capital Investment Summary ($ in Millions) FY 2025 FY 2026 FY 2027 Line No. Total Cost Total Cost Total Cost 10.660 15.466 23.593 00-02 Logistics Modernization Program 10.660 15.466 23.593 TOTAL OBLIGATIONS 10.660 15.466 23.593 Total Capital Outlays Total Depreciation Expense 13.262 17.155 15.341 15.823 19.386 15.920 Item Description Software Development - Externally Developed 88 EXHIBIT FUND 9a CAPITAL INVESTMENT SUMMARY === page 93 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Supply Management Capital Purchase Justification ($ in Millions) Line No. 00-02 Supply Management Item Description Logistics Modernization Program Software Development - Externally Developed Logistics Modernization Program (LMP) FY 2025 FY 2026 FY 2027 10.660 15.466 23.593 Total 10.660 15.466 23.593 Narrative Justification LMP requires ajustments to remain relevant and maintain superior supply chain functionality, supporting National Level Logistics. LMP Increment 1 was fully fielded in October 2010 and enhanced by LMP Increment 2 in September 2016. These increments combine to comprise the current LMP capability which is currently used by approximately 19,000 users at more than 50 Army locations worldwide. LMP is a key enabler for the Army to achieve its commitment to having fully auditable AWCF financial statements. LMP continues to seamlessly enable continuous process improvements to the LMP solution to achieve and meet compliance requirements and trading partner requirements. In FY 2026-2027, LMP will continue to design, develop, test, and deploy approved improvements to the existing business processes supported by the Army Working Capital Fund (AWCF). These efforts include addressing continuing auditability requirements and ensuring financial accountability, implementing changes to financial data structures, and integrating common tools from Army Enterprise Resource Planning (ERPs). LMP will also focus on integrating the Army Contract Writing Systems (ACWS) by deploying funding interfaces with General Fund Enterprise Business Systems (GFEBS) and migrating contracts from the Procurement Desktop Defense System (PADDS) to ACWS, with corresponding Purchase Order conversations within LMP. Enhancements to the reporting functionality will address current technical limitations and provide improved data to AMC Life Cycle Management Commands (LCMC's), alongside technical upgrades to the Business Technology Platform (BTP) Integration Suite as SAP ends support for current products. LMP will implement Identity, Credential and Access Management (ICAM) to meet the audit and cybersecurity objectices through Zero Trust implementation. These tasks also include technical upgrades, minor enhancements, compliance, auditability, and providing of data to support Army data analytics. LMP will analyze and test G-Invoicing 2.0 Release 2, collaborate with stakeholders to improve Order Modifications and G-Invoicing interfund transaction capabilities, as directed by the Department of the Army. Addressing AMC Manufacturing and Remanufacturing requirements and migrating from Computerized Assisted Maintenance Systems (CAMS). CAMC reached the end of mainstream support in December 2024, is currently in extended maintenance and will be end-of-life in December 2028. SAP Production Engineering and Operations (PEO) is the successor product to CAMS. LMP will perform a technical upgrade from CAMS to PEO to ensure continued support for AMC's Organic Industrial Base operations. All tasks will adhere to AWCF rules to ensure appropriate use of funds, with cybersecurity and auditability remaining paramount, and continued interface development with Army ACWS. Failure to fund LMP would prohibit AMC functional requirements from improving operations and put continuing financial compliance and cyber security at risk. In addition, LMP would not be in compliance with directives for Zero Trust putting the solution at risk from a cyber security perspective. It also would not be able to meet all Federal and Army milestones as developed in the Army Standard Line of Accounting implementation plan for auditability. EXHIBIT FUND 9b CAPITAL PURCHASE JUSTIFICATION 89 === page 94 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Supply Management Capital Budget Execution ($ in Millions) FY Major Category 2025 Software Development Logistics Modernization Program Initial Request Current Projected Cost Approved Change 14.030 10.660 14.030 10.660 15.059 15.466 15.059 15.466 Logistics Modernization Program 23.593 23.593 0.000 Total FY 2027 23.593 23.593 0.000 Explanation (3.370) Reduction to FY25 LMP Requirement (3.370) Total FY 2025 2026 Software Development Logistics Modernization Program Total FY 2026 LMP cost increase 0.407 0.407 2027 Software Development 90 EXHIBIT FUND 9c CAPITAL BUDGET EXECUTION === page 95 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Capital Purchase Justification ($ in Millions) FY 2025 Line No. 05-13 Item Description FY2026 FY 2027 Total Cost Total Cost Total Cost NON- ADPE EQUIPMENT CAPABILITIES 51.606 108.450 70.196 ADPE & Telecommunications Equipment Industrial Control Network - Phase 1 of 3 Industrial Control Network - Phase 2 of 3 Industrial Control Network - Phase 3 of 3 20.056 0.000 2.214 2.192 15.650 0.000 0.000 0.000 0.000 0.000 04-26 04-26 04-26 04-26 ASRS Information Technology (IT) Lifecycle Replacement 2.781 2.781 0.000 0.000 0.000 00-02 Software Development - Externally Developed - Logistics Modernization Program 4.001 4.001 6.792 6.792 10.111 10.111 05-26 MINOR CONSTRUCTION CAPABILITIES 1.262 3.730 4.000 Total Obligations* 59.650 139.028 84.307 Total Capital Outlays Total Depreciation Expense 75.361 59.736 94.953 65.954 104.307 58.431 *Note: FY 2025 total of $59.650M does not include the following dollar amounts executed against prior year projects: FY 2022 NonADP Equip. $0.105M, FY 2023 Non-ADP Equip. $0.113, FY24 Non-ADP Equip $29.548M, FY 2024 ADPE $2.256M, FY 2024 MC $4.901M, FY24 Software $4.082M, Total all years $41.006M. EXHIBIT FUND 9a CAPITAL PURCHASE SUMMARY 91 === page 96 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Capital Purchase Justification ($ in Millions) Line No. 05-13 Industrial Operations Item Description Non - ADPE Equipment Total Non - ADPE Equipment Capabilities Non - ADPE Equipment FY 2025 FY 2026 FY 2027 51.606 108.450 70.196 51.606 108.450 70.196 Narrative Justification This exhibit represents equipment purchases costing more than $250K, which will improve the installations' efficiency or effectiveness through replacement, modification or addition of production and maintenance capability and compliance with new mission requirements. Equipment supports organic maintenance, overhaul, rebuild, reclamation, conversion, renovation, modification and repair programs. Acquisition of this equipment improves productivity; increases capacity that cannot be met with current equipment; replaces unsafe, inoperable or unusable assets; and includes requirements for environmentally hazardous waste reduction or regulatory agency mandated requirements. This new equipment increases reliability and productivity, thus enabling the installation to be more efficient. If not acquired, the impact would be reduced mission capability, cause failure to meet present and future workload requirements, increase man-hour expenditures, cause inability to meet production schedules, lead to excessive downtime, increase maintenance costs, and decrease accuracy and dependability. 92 EXHIBIT FUND 9b CAPITAL PURCHASE JUSTIFICATION === page 97 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Capital Purchase Justification ($ in Millions) Line No. 04-26 Industrial Operations ADPE & Telecommunication Equipment PAVIS Video Infrastructure Upgrade - Phase 1 of 3 Item Description Industrial Control Network - Phase 1 of 3 Total FY 2025 2.781 2.781 FY 2026 0.000 0.000 FY 2027 0.000 0.000 Narrative Justification Installed in 1998, the Public Address/Visual Information System (PAVIS) at Tobyhanna Army Depot (TYAD) uses headend equipment connected to TV monitors via underground coaxial cables across nearly 50 buildings. PAVIS enables mass communication through video, including for the hearing impaired who may not hear audio announcements. The PAVIS Video Infrastructure Upgrade project is crucial for TYAD’s core operations and readiness, allowing the Depot to share important messages, including those from the Depot Commander, as part of its Strategic Communications Plan. However, the current system is over 20 years old and increasingly difficult to maintain. It lacks support for high-resolution images, real-time video announcements, live event feeds, and a ticker bar for updates. Additionally, the existing system does not include modern emergency alert features, such as separate video output zones for notifications. Its online capability is limited to the now-unsupported Internet Explorer browser. The onsite contractor is the only one with expertise in maintaining this aging equipment. It is also not a networked system which limits broadcast capability and access to the system; a networked system would be much more scalable with the existing computer network infrastructure and would enable Public Affairs personnel to connect video equipment throughout the Depot to broadcast live events, such as Change of Command ceremonies. The goal is to upgrade TYAD’s PAVIS video infrastructure to a modern networked solution. This project will involve purchasing and installing new equipment, including headend equipment, display monitors, HDMI/adapter cabling, remote controls, software licenses, and other components. The setup will include training TYAD personnel, establishing a plug-and-play baseline, and setting user access security. The scope of work includes removing the old coaxial cables, headend system, and video displays. The upgraded system will support Video on Demand (VoD) and live content broadcasting at the Depot. It will also control digital signage for real-time announcements. Additionally, the system will feature modern visual rendering and a password-protected software solution for creating communications content for the Depot workforce. Without an upgrade to the PAVIS video infrastructure, the equipment will become increasingly difficult to maintain, and the Depot will lose capability to communicate with its employees, especially its deaf community. Due to the age of the technology, the Public Affairs team cannot take full advantage of modern broadcasting capabilities such as high-resolution images, real-time video announcements, live event feeds or a ticker bar at the bottom of the screen to keep the Depot workforce and visitors better informed. Upgrading the PAVIS video infrastructure will allow TYAD to implement a fully functional video solution with modern features. It is an important part of the Depot Strategic Communications Plan. EXHIBIT FUND 9b CAPITAL PURCHASE JUSTIFICATION 93 === page 98 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Capital Purchase Justification ($ in Millions) Line No. 04-26 Industrial Operations ADPE & Telecommunication Equipment Industrial Control Network - Phase 2 of 3 Item Description Industrial Control Network - Phase 2 of 3 Total FY 2025 0.000 0.000 FY 2026 2.214 2.214 FY 2027 0.000 0.000 Narrative Justification Tobyhanna Army Depot's (TYAD) current network is the Sensitive But Unclassified (SBU) Local Area Network (LAN), which is the Non-classified Internet Protocol (IP) Router Network (NIPRNet). It is an IP network used to exchange unclassified information, including information subject to controls on distribution, among the users of the private network. The NIPRNet also provides its users access to the Internet. Industrial and infrastructure systems share the NIPRNet with all users. This further jeopardizes the integrity of our security efforts, as this can allow the exploitation of vulnerable systems. United States Army Network Enterprise Technology Command (NETCOM) no longer allows anything other than office equipment (such as printers and computers) to reside on the NIPRNet. TYAD must remove all Industrial Control Systems from the NIPRNet. The 7th Signal Command (Theater), in coordination with (ICW) mission partners, executes discovery and convergence operations of Organizational Networks (ORGNETs) within the CONUS Area of Responsibility (AOR) to identify, assess, and plan the transfer of ORGNET's Command and Control (C2), all AITSC/AITP services, and the realignment of appropriate resources no later than 29 September 2025. During the development of most facility and manufacturing technologies, cybersecurity was far less of an issue, and industrial control systems (ICS) and operational technologies (OT) were less exposed. As infrastructures grow in size and complexity, so do their attack surfaces. Unauthorized access and advanced malware threats are growing in intensity. Maintenance and repairs on Industrial Control Systems (ICS) pose a growing risk and can halt operations while waiting for a vendor or technician to arrive on site. Allowing external repair technicians to connect to systems remotely can speed up the process; however, if they use unsecured remote access tools, the ICS becomes vulnerable to attack. The current vulnerable equipment at TYAD increases cyber threat, hindering efforts to reduce it. Installing an Industrial Control Network (ICN) will enable TYAD to comply with mandated objectives. Additionally, it will allow the removal of industrial control systems from the NIPRNet, as directed by NETCOM. This supports the Army C5ISR Systems category within the Organic Industrial Base (OIB) Modernization Plan. TYAD will be capable of monitoring the ICN and perform maintenance on the single network. Failure to purchase and install the new ICN would result in the removal of critical industrial control systems from our NIPRNet, as required by NETCOM. The control systems currently reside on many fragmented smaller networks. 94 EXHIBIT FUND 9b CAPITAL PURCHASE JUSTIFICATION === page 99 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Capital Purchase Justification ($ in Millions) Line No. 04-26 Industrial Operations ADPE & Telecommunication Equipment Industrial Control Network - Phase 3 of 3 Item Description Industrial Control Network - Phase 3 of 3 Total FY 2025 0.000 0.000 FY 2026 2.192 2.192 FY 2027 0.000 0.000 Narrative Justification Tobyhanna Army Depot's (TYAD) current network is the Sensitive But Unclassified (SBU) Local Area Network (LAN), which is the Non-classified Internet Protocol (IP) Router Network (NIPRNet). It is an IP network used to exchange unclassified information, including information subject to controls on distribution, among the users of the private network. The NIPRNet also provides its users access to the Internet. Industrial and infrastructure systems share the NIPRNet with all users. This further jeopardizes the integrity of our security efforts, as this can allow the exploitation of vulnerable systems. United States Army Network Enterprise Technology Command (NETCOM) no longer allows anything other than office equipment (such as printers and computers) to reside on the NIPRNet. TYAD must remove all Industrial Control Systems from the NIPRNet. The 7th Signal Command (Theater), in coordination with (ICW) mission partners, executes discovery and convergence operations of Organizational Networks (ORGNETs) within the CONUS Area of Responsibility (AOR) to identify, assess, and plan the transfer of ORGNET's Command and Control (C2), all AITSC/AITP services, and the realignment of appropriate resources no later than 29 September 2025. During the development of most facility and manufacturing technologies, cybersecurity was far less of an issue, and industrial control systems (ICS) and operational technologies (OT) were less exposed. As infrastructures grow in size and complexity, so do their attack surfaces. Unauthorized access and advanced malware threats are growing in intensity. Maintenance and repairs on Industrial Control Systems (ICS) pose a growing risk and can halt operations while waiting for a vendor or technician to arrive on site. Allowing external repair technicians to connect to systems remotely can speed up the process; however, if they use unsecured remote access tools, the ICS becomes vulnerable to attack. The current vulnerable equipment at TYAD increases cyber threat, hindering efforts to reduce it. Installing an Industrial Control Network (ICN) will enable TYAD to comply with mandated objectives. Additionally, it will allow the removal of industrial control systems from the NIPRNet, as directed by NETCOM. This supports the Army C5ISR Systems category within the Organic Industrial Base (OIB) Modernization Plan. TYAD will be capable of monitoring the ICN and perform maintenance on the single network. Failure to purchase and install the new ICN would result in the removal of critical industrial control systems from our NIPRNet, as required by NETCOM. The control systems currently reside on many fragmented smaller networks. EXHIBIT FUND 9b CAPITAL PURCHASE JUSTIFICATION 95 === page 100 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Capital Purchase Justification ($ in Millions) Line No. 02-46 Industrial Operations ADPE & Telecommunication Equipment Distributed Antenna System (DAS) Item Description ASRS Information Technology (IT) Lifecycle Replacement Total FY 2025 0.000 0.000 FY 2026 15.650 15.650 FY 2027 0.000 0.000 Narrative Justification The current Anniston Army Depot (ANAD) ASRS devices were purchased in 2010 and are 11 years old. The operation system (OS) is predicted to end of life in December 2025 which will lead to a Cyber Security Technical Implementation Guidelines (STIG) Category (CAT) 1 finding. There is a high probability that the existing hardware will not support the replacement OS due to the age of the servers. The status quo is not sustainable. All of the equipment is past End of Life (EOL) and is maintained under a “best effort” support contract. Current ASRS does not meet current Cyber Security requirements and will be shut down if a CAT 1 violation is found due to evolving cyber risks. The current in-use system is a single point of failure. Completion of ANAD’s workload in a timely manner requires the services of an automated warehouse to store new and reconditioned repair parts until they are required in the production shops. This project will restore ASRS to a supportable, cyber complaint state and remediate the risk of work stoppage that would be caused by the current ASRS failing or being quarantined. The current devices were purchased in 2010 and are 11 years old. The OS is predicted to end of life in December 2025 which will lead to a Cyber STIG CAT 1 finding. There is a high probability that the existing hardware will not support the replacement OS due to the age of the servers. The status quo is not sustainable. All the equipment is past EOL and is maintained under a “best effort” support contract which is expiring. 96 EXHIBIT FUND 9b CAPITAL PURCHASE JUSTIFICATION === page 101 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Capital Purchase Justification ($ in Millions) Line No. 00-02 Industrial Operations Software Development - Externally Developed Logistics Modernization Program (LMP) Item Description Logistics Modernization Program (LMP) Total FY 2025 4.001 4.001 FY 2026 6.792 6.792 FY 2027 10.111 10.111 Narrative Justification LMP continues to require enhancements to stay relevant and maintain superior supply chain functionality, supporting National-Level Logistics. LMP Increment 1 was fully fielded in October 2010 and further enhanced by the full deployment declaration of LMP Increment 2 in September 2016. Together, these upgrades form the current LMP capability, which approximately 19,000 users use across more than 50 Army locations worldwide. LMP helps the Army achieve its commitment to having fully auditable AWCF financial statements. The LMP continues to seamlessly enable continuous process improvements within the LMP solution, allowing it to meet and comply with the requirements of both its own and its trading partners' standards. In FY 2026-2027, LMP will continue to design, develop, test, and deploy improvements to existing business processes enabled by LMP in support of the Organic Industrial Base (OIB). The upgrades are part of continuous process improvement under capability support. These improvements will address changes needed within the OIB to enable Army priorities. Planned enhancements to shop floor operations include updates to to Shop Floor UI/UX, which will improve usability and modernize industrial base operations. LMP will also address ongoing auditability requirements to ensure continued financial compliance from a financial accountability perspective. Improvements to the OIB reporting capabilities will address the technical limitations of the current solution and provide improved reporting capabilities for Army industrial site users. Implementation of Army Enterprise Resource Planning (ERP) tools will continue in support of LMP operational standardization and operational support. These tasks also include technical upgrades, minor enhancements, compliance, auditability, providing data in support of Army data analytics, and cyber security requirements. A new requirement for G-Invoicing will be incorporated to support Department of Army directives. Technical upgrades to the LMP solution for BTP Integration Suite will be required as SAP drops support to current products. EXHIBIT FUND 9b CAPITAL PURCHASE JUSTIFICATION 97 === page 102 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Capital Purchase Justification ($ in Millions) Line No. 05-26 Industrial Operations Minor Construction Capabilities Various Minor Construction <$4 Million Item Description FY 2025 FY 2026 FY 2027 1.262 1.262 3.730 3.730 4.000 4.000 Various Minor Construction Capabilities Total Narrative Justification Various minor construction projects costing less than $4M, will improve the efficiency of the Industrial Operations through new, modernized additions to renovate existing facilities. The construction projects are additions or modifications to meet mission needs and improve the quality of life (safety/environmental concerns). The projects will increase productivity and allow for quality of life improvements. Specifically, the efficiency of the mission work will improve with better plant layout, better electrical distribution, and improved lighting, heating, ventilation and air conditioning. The projects specific to quality of life improvements will improve worker morale and eliminate potential health and safety concerns. If not approved, facility conditions will continue to decline, worker morale will decline, the work environment will erode, and worker safety and health will continue to be a major concern. 98 EXHIBIT FUND 9b CAPITAL PURCHASE JUSTIFICATION === page 103 === Army Working Capital Fund Fiscal Year (FY) 2027 Budget Estimates Industrial Operations Capital Budget Execution ($ in Millions) FY 2025 Major Category Non-ADPE 2027 Current Projected Approved Cost Change 74.357 51.606 Explanation (22.751) Projects canceled or moved to another fiscal year 2.791 2.781 (0.010) Software 8.581 4.001 (4.580) Updated LMP costs Minor Construction 14.539 1.262 (13.277) Projects cancelled or moved to another fiscal year Total FY 2025 100.268 59.650 (40.618) Non-ADPE 168.918 108.450 (60.468) Projects canceled or moved to another fiscal year ADPE and Telcom 10.793 20.056 9.263 Cost growth and priority moved from FY24 to FY26 ADPE and Telcom 2026 Initial Request Software Development 7.200 6.792 (0.408) Updated LMP costs Minor Construction 10.822 3.730 (7.092) Updated Minor Construction projects Total FY 2026 197.733 139.028 (58.705) Non-ADPE 70.196 70.196 0.000 ADPE and Telcom 0.000 0.000 0.000 Software Development 10.111 10.111 0.000 Minor Construction 4.000 4.000 0.000 Total FY 2027 84.307 84.307 0.000 EXHIBIT FUND 9c CAPITAL BUDGET EXECUTION 99