=== page 1 === UNCLASSIFIED Department of War Fiscal Year (FY) 2027 Budget Estimates April 2026 Army Justification Book Volume 1 of 1 Procurement of W&TCV, Army Procurement of Weapons and Tracked Combat Vehicles (W&TCV) UNCLASSIFIED === page 2 === === page 3 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Volume 1 Table of Contents Introduction and Explanation of Contents................................................................................................................Volume 1 - ii Comptroller Exhibit P-1..............................................................................................................................................Volume 1 - iv Line Item Table of Contents (by Appropriation then Line Number).................................................................... Volume 1 - xix Line Item Table of Contents (Alphabetically by Line Item Title)......................................................................... Volume 1 - xxii Exhibit P-1M, Procurement Programs - Modification Summary........................................................................ Volume 1 - xxiv Exhibit P-40s................................................................................................................................................................ Volume 1 - 1 UNCLASSIFIED Volume 1 - i === page 4 === === page 5 === Cost Statement The following Justification Books were prepared at a cost of $337,499.00: Aircraft (ACFT), Missile (MSLS), Weapons & Tracked Combat Vehicles (WTCV), Ammunition (AMMO), Other Procurement Army (OPA) 1 - Tactical & Support Vehicles, Other Procurement Army (OPA) 2 - Communications & Electronics, Other Procurement Army (OPA) 3 & 4 - Other Support Equipment & Spares, Research, Development, Test and Evaluation (RDTE) for: Budget Activity 1, Budget Activity 2, Budget Activity 3, Budget Activity 4A, Budget Activity 4B, Budget Activity 5A, Budget Activity 5B, Budget Activity 5C, Budget Activity 5D, Budget Activity 6, Budget Activity 7 and Budget Activity 8. Volume 1 - ii === page 6 === PROCUREMENT OF W&TCV, ARMY Appropriation Language For construction, procurement, production, and modification of weapons and tracked combat vehicles, equipment, including ordnance, spare parts, and accessories therefore; specialized equipment and training devices; expansion of public and private plants, including the land necessary therefore, for the foregoing purposes, and such lands and interests therein, may be acquired, and construction prosecuted thereon prior to approval of title; and procurement and installation of equipment, appliances, and machine tools in public and private plants; reserve plant and government and contractor-owned equipment layaway; and other expenses necessary for the foregoing purposes, $3,728,159,000.00 to remain available for obligation until September 30, 2029. Volume 1 - iii === page 7 === Volume 1 - iv === page 8 === Volume 1 - v === page 9 === Volume 1 - vi === page 10 === Volume 1 - vii === page 11 === Volume 1 - viii === page 12 === Volume 1 - ix === page 13 === Volume 1 - x === page 14 === Volume 1 - xi === page 15 === Volume 1 - xii === page 16 === Volume 1 - xiii === page 17 === Volume 1 - xiv === page 18 === Volume 1 - xv === page 19 === Volume 1 - xvi === page 20 === Volume 1 - xvii === page 21 === Executive Summary for Weapons & Tracked Combat Vehicles (WTCV) Table 1: Funding Overview Discretionary FY 2025 ($K) FY 2026 ($K) FY 2027 ($K) $5,905,253 $3,005,021 $3,728,159 $0 $480,000 $0 $5,905,253 $3,485,021 $3,728,159 Mandatory Total Table 2: Detailed Mandatory Breakout BLI Reconciliation Bin Title 0363G85200 Improving Readiness 2944G80819 Improving Readiness Mandatory Total FY 2025 ($K) $0 $0 $0 FY 2026 ($K) FY 2027 ($K) $230,000 $0 $250,000 $0 $480,000 $0 MANDATORY FUNDING JUSTIFICATION: The FY 2026 spend plan amount for Weapons & Tracked Combat Vehicles includes $3,005,021 thousand of discretionary and $480,000 thousand of mandatory (reconciliation) for a total of $3,485,021 thousand. Volume 1 - xviii === page 22 === === page 23 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (by Appropriation then Line Number) Appropriation 2033A: Procurement of W&TCV, Army Line # BA BSA Line Item Number Line Item Title Page 1 01 10 2944G80819 Armored Multi Purpose Vehicle (AMPV)............................................................................................... Volume 1 - 1 3 01 10 4872G84900 ASSAULT BREACHER VEHICLE (ABV).............................................................................................Volume 1 - 11 4 01 10 7181G80820 M10 BOOKER......................................................................................................................................Volume 1 - 20 5 01 10 7241G86000 XM30 MECHANIZED INFANTRY COMBAT VEHICLE (MICV)...........................................................Volume 1 - 21 6 01 20 0230GM0100 Stryker (Mod)....................................................................................................................................... Volume 1 - 30 7 01 20 0363G85200 Stryker Upgrade................................................................................................................................... Volume 1 - 31 8 01 20 1382GZ3300 BRADLEY FIRE SUPPORT TEAM (BFIST) VEHICLE........................................................................Volume 1 - 38 9 01 20 1678GZ2400 Bradley Program (MOD)...................................................................................................................... Volume 1 - 42 10 01 20 2072GA0400 M109 FOV Modifications......................................................................................................................Volume 1 - 60 11 01 20 2073GZ0410 Paladin Integrated Management (PIM)................................................................................................ Volume 1 - 76 12 01 20 3700GA0570 IMPROVED RECOVERY VEHICLE (M88 HERCULES)..................................................................... Volume 1 - 83 13 01 20 5225GZ3001 Joint Assault Bridge............................................................................................................................. Volume 1 - 92 14 01 20 6500GA0750 Abrams Upgrade Program................................................................................................................. Volume 1 - 101 15 01 20 6652GM1900 VEHICLE PROTECTION SYSTEMS (VPS)...................................................................................... Volume 1 - 112 UNCLASSIFIED Volume 1 - xix === page 24 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Appropriation 2033A: Procurement of W&TCV, Army Line # BA BSA Line Item Number Line Item Title Page 16 02 10 0418GN0003 PERSONAL DEFENSE WEAPON (ROLL)........................................................................................Volume 1 - 124 17 02 10 2472G13000 M240 Medium Machine Gun (7.62mm)............................................................................................. Volume 1 - 125 18 02 10 5000GB2000 Machine Gun, Cal .50 M2 Roll.......................................................................................................... Volume 1 - 126 19 02 10 6580G02200 Mortar Systems.................................................................................................................................. Volume 1 - 127 20 02 10 6659G08100 LOCATION & AZIMUTH DETERMINATION SYSTEM (LADS)......................................................... Volume 1 - 129 21 02 10 8181G01501 XM320 Grenade Launcher Module (GLM)........................................................................................ Volume 1 - 133 22 02 10 8190G01506 Precision Sniper Rifle........................................................................................................................ Volume 1 - 134 23 02 10 8201G13501 Carbine...............................................................................................................................................Volume 1 - 136 24 02 10 8205G14510 Next Generation Squad Weapon.......................................................................................................Volume 1 - 137 25 02 10 8310G04700 Common Remotely Operated Weapons Station................................................................................Volume 1 - 164 26 02 10 8635G15325 Handgun.............................................................................................................................................Volume 1 - 165 27 02 20 3000GB3000 MK-19 Grenade Machine Gun MODS............................................................................................... Volume 1 - 166 28 02 20 3005GZ1700 M777 Mods........................................................................................................................................ Volume 1 - 167 29 02 20 3181GZ1500 Sniper Rifles Modifications.................................................................................................................Volume 1 - 169 30 02 20 3640GC0401 M119 Modifications............................................................................................................................ Volume 1 - 171 31 02 30 1862GL3200 Items Less Than $5.0m (WOCV-WTCV)...........................................................................................Volume 1 - 173 UNCLASSIFIED Volume 1 - xx === page 25 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Appropriation 2033A: Procurement of W&TCV, Army Line # BA BSA Line Item Number Line Item Title 32 02 30 Production Base Support (WOCV-WTCV).........................................................................................Volume 1 - 175 3270GC0050 Page UNCLASSIFIED Volume 1 - xxi === page 26 === === page 27 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (Alphabetically by Line Item Title) Line Item Title Line Item Number Line # BA BSA Page ASSAULT BREACHER VEHICLE (ABV) 4872G84900 3 01 10..................... Volume 1 - 11 Abrams Upgrade Program 6500GA0750 14 01 20................... Volume 1 - 101 Armored Multi Purpose Vehicle (AMPV) 2944G80819 1 01 10....................... Volume 1 - 1 BRADLEY FIRE SUPPORT TEAM (BFIST) VEHICLE 1382GZ3300 8 01 20..................... Volume 1 - 38 Bradley Program (MOD) 1678GZ2400 9 01 20..................... Volume 1 - 42 Carbine 8201G13501 23 02 10................... Volume 1 - 136 Common Remotely Operated Weapons Station 8310G04700 25 02 10................... Volume 1 - 164 Handgun 8635G15325 26 02 10................... Volume 1 - 165 IMPROVED RECOVERY VEHICLE (M88 HERCULES) 3700GA0570 12 01 20..................... Volume 1 - 83 Items Less Than $5.0m (WOCV-WTCV) 1862GL3200 31 02 30................... Volume 1 - 173 Joint Assault Bridge 5225GZ3001 13 01 20..................... Volume 1 - 92 LOCATION & AZIMUTH DETERMINATION SYSTEM (LADS) 6659G08100 20 02 10................... Volume 1 - 129 M10 BOOKER 7181G80820 4 01 10..................... Volume 1 - 20 M109 FOV Modifications 2072GA0400 10 01 20..................... Volume 1 - 60 M119 Modifications 3640GC0401 30 02 20................... Volume 1 - 171 M240 Medium Machine Gun (7.62mm) 2472G13000 17 02 10................... Volume 1 - 125 M777 Mods 3005GZ1700 28 02 20................... Volume 1 - 167 UNCLASSIFIED Volume 1 - xxii === page 28 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page MK-19 Grenade Machine Gun MODS 3000GB3000 27 02 20................... Volume 1 - 166 Machine Gun, Cal .50 M2 Roll 5000GB2000 18 02 10................... Volume 1 - 126 Mortar Systems 6580G02200 19 02 10................... Volume 1 - 127 Next Generation Squad Weapon 8205G14510 24 02 10................... Volume 1 - 137 PERSONAL DEFENSE WEAPON (ROLL) 0418GN0003 16 02 10................... Volume 1 - 124 Paladin Integrated Management (PIM) 2073GZ0410 11 01 20..................... Volume 1 - 76 Precision Sniper Rifle 8190G01506 22 02 10................... Volume 1 - 134 Production Base Support (WOCV-WTCV) 3270GC0050 32 02 30................... Volume 1 - 175 Sniper Rifles Modifications 3181GZ1500 29 02 20................... Volume 1 - 169 Stryker (Mod) 0230GM0100 6 01 20..................... Volume 1 - 30 Stryker Upgrade 0363G85200 7 01 20..................... Volume 1 - 31 VEHICLE PROTECTION SYSTEMS (VPS) 6652GM1900 15 01 20................... Volume 1 - 112 XM30 MECHANIZED INFANTRY COMBAT VEHICLE (MICV) 7241G86000 5 01 10..................... Volume 1 - 21 XM320 Grenade Launcher Module (GLM) 8181G01501 21 02 10................... Volume 1 - 133 UNCLASSIFIED Volume 1 - xxiii === page 29 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Exhibit P-1M, Procurement Programs - Modification Summary (Listing by Model) Lookup Matrix by Model Model: M2 & M3 Bradley Vehicle Variants P-3a Individual Modifications Modification Number GZ2400 Modification Title Bradley Program (MOD) Applies to Multiple Models No Model: M109 Howitzer and M992 FAASV/CAT Vehicles P-3a Individual Modifications Modification Number GA0400 Modification Title M109 FOV Modifications Applies to Multiple Models No UNCLASSIFIED Exhibit P-1M, Procurement Programs - Modification Summary Page 1 of 1 Volume 1 - xxiv === page 30 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Exhibit P-1M, Procurement Programs - Modification Summary (Funding for Modifications) Funding ($ M) P-3a Modification Title PYS FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 Exhibit P-3a Bradley Program (MOD) 11,850.797 439.489 157.183 161.979 - 161.979 116.960 102.829 73.174 73.956 M109 FOV Modifications 2,236.676 42.574 82.537 74.070 - 74.070 83.898 79.164 25.650 - 14,087.473 482.063 239.720 236.049 0.000 236.049 200.858 181.993 98.824 73.956 Totals (Total Obligation Authority) Total Obligation Authority UNCLASSIFIED Exhibit P-1M, Procurement Programs - Modification Summary Page 1 of 1 Volume 1 - xxv === page 31 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 10: 2944G80819 / Armored Multi Purpose Vehicle (AMPV) Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0605028A Line Item MDAP/MAIS Code: 471 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 938 245 49 196 - 196 191 187 183 180 728 2,897 3,940.356 1,466.011 415.331 1,150.759 - 1,150.759 1,150.897 1,151.178 1,151.716 1,153.031 6,271.072 17,850.351 3,940.356 3,940.356 1,466.011 1,466.011 415.331 415.331 - - 1,150.759 - - 1,150.759 - 1,150.759 - 1,150.759 1,150.897 1,150.897 1,151.178 1,151.178 1,151.716 1,151.716 To FY 2031 Complete 1,153.031 1,153.031 Total 6,271.072 17,850.351 6,271.072 17,850.351 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 4,200.806 5,983.718 8,476.143 5,871.219 - 5,871.219 6,025.639 6,156.032 6,293.530 6,405.728 8,614.110 6,161.668 Description: The FY 2026 spend plan amount for Armored Multi Purpose Vehicle (AMPV) includes $415,331 thousand of discretionary and $250,000 thousand of mandatory (reconciliation) for a total of $665,331 thousand. The Armored Multi-Purpose Vehicle (AMPV) is an ACAT IC program that replaces the Army's Armored Personnel Carrier (M113) Family of Vehicles (FOV) within the Armored Brigade Combat Team (ABCT). The AMPV replaces and provides added capability that mitigates gaps that the Army's Vietnam-Era M113 FOV such as improved mobility, lethality, network communication/interoperability and protection necessary to move personnel and perform key mission roles on the battlefield within the ABCT. Fielding is currently underway and expected to continue until Army Acquisition Objective (AAO) completion. The funding also supports engineering design, testing, hardware procurement, software upgrades, and application in support of improvements to resolve problems identified in the field and approved by the program and requirements community as priority for fielded AMPV FOVs. These improvements address maintaining operational readiness rates, improving vehicle safety and operation, and integrating new equipment. Funding supports all aspects of program management necessary to support the fielded fleet of AMPVs as well as facility vehicles through FY 2027 for System Technical Support (STS) work for development and qualifications of engineering change proposals (ECPs) and technical improvements. ECPs such as Composite Rubber Track will be applied through a modification work order and procured for the AMPV FOV. This priority program is a high-density platform that accounts for approximately 30% of the Armored Brigade Combat Team's tracked fleet with an AAO of 2,897 and covers multiple mission sets. The AMPV FOVs consists of the following five variants with different missions roles for each: 1. Mission Command (CD) Variant: This platform enables effective mission command planning and execution for both the Tactical Operations Center (TOC) and Tactical Command Vehicle (TAC) versions of the Mission Command Variant. It will host current Battle Command Systems, future replacements, and upgrades of hardware and software. 2. Medical Treatment (MT) Variant: This platform provides a protected surgical environment, with adequate lighting and accessible medical equipment. It provides a capability for immediate medical and surgical care to the front lines for one patient by a medical crew of four. 3. Medical Evacuation (ME) Variant: This platform conducts ambulance type activities and provides casualty evacuation for up to four litter (tactical stretcher) or six ambulatory patients, with a crew of three medical attendants. 4. General Purpose (GP) Variant: This platform operates throughout the battle space by conducting re-supply, maintenance, casualty evacuation, and other tasks within the formation. 5. Mortar Carrier (MC) Variant: This platform provides immediate responsive fire support to conduct fast-paced offensive operations. LI 2944G80819 - Armored Multi Purpose Vehicle (AMPV) Army UNCLASSIFIED Page 1 of 10 P-1 Line #1 Volume 1 - 1 === page 32 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 10: 2944G80819 / Armored Multi Purpose Vehicle (AMPV) Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0605028A Line Item MDAP/MAIS Code: 471 Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 245 49 196 - 196 191 187 183 180 1,466.011 415.331 1,150.759 - 1,150.759 1,150.897 1,151.178 1,151.716 1,153.031 245 49 196 - 196 191 187 183 180 1,466.011 415.331 1,150.759 - 1,150.759 1,150.897 1,151.178 1,151.716 1,153.031 LI 2944G80819 - Armored Multi Purpose Vehicle (AMPV) Army UNCLASSIFIED Page 2 of 10 P-1 Line #1 Volume 1 - 2 === page 33 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 10: 2944G80819 / Armored Multi Purpose Vehicle (AMPV) Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0605028A Line Item MDAP/MAIS Code: 471 Exhibits Schedule Exhibit Type Title* P-5 G80819 / Armored Multi Purpose Vehicle (AMPV) P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 938 / 3,940.356 245 / 1,466.011 49 / 415.331 196 / 1,150.759 - / - 196 / 1,150.759 938 / 3,940.356 245 / 1,466.011 49 / 415.331 196 / 1,150.759 - / - 196 / 1,150.759 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Base Procurement dollars in the amount of $1,150.759 million procures 196 AMPVs. Funding supports all aspects of the Armored Multi-Purpose Vehicle (AMPV) Full Rate Production program. Funding supports Government Program Management required to provide oversight on contractor production operations that include, but not limited to: Quality Process Management, Program Management, Government Furnished Property / Material / Equipment and Material Management, kits, modification hardware and engineering activities resulting from field problem resolutions or user approved system enhancements. Funds the manufacturing and assembly of sub-systems; the integration, test and check-out operations that results in the production of the 196 AMPVs. The funding supports obsolescence management and software updates to enable uninterrupted production, fleet modifications, and retrofits to implement system enhancements that affect vehicle configurations and previously procured hardware. The Program Office manages the Systems Technical Support (STS) and Government Furnished Material contracts that provide direct support to the program and the field, field modifications, program office requirements and System Technical Support (STS) contractor support for the AMPV FOVs. Funds all system technical data, provisioning data, technical manuals, and Interactive-Electronic Technical Manuals (IETMs) and emergency field support as required for essential mission accomplishment. The AMPV replaces the M113 Family of Vehicles (FOV) by providing a more capable platform in today's Armored Brigade Combat Team (ABCT) with increased performance and capability across multiple areas and mitigates current and future capability gaps in force protection, survivability, lethality, mobility, network, reliability, and interoperability moving personnel within multiple mission sets. Army Acquisition Objective (AAO): 2,897 vehicles In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 2944G80819 - Armored Multi Purpose Vehicle (AMPV) Army UNCLASSIFIED Page 3 of 10 P-1 Line #1 Volume 1 - 3 === page 34 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2944G80819 / Armored Multi Purpose Vehicle (AMPV) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: G80819 / Armored Multi Purpose Vehicle (AMPV) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2026 FY 2027 Total 49 196 - 196 3,940.356 1,466.011 415.331 1,150.759 - 1,150.759 - - 3,940.356 Plus CY Advance Procurement ($ in Millions) - 1,466.011 - Total Obligation Authority ($ in Millions) FY 2027 OOC 245 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2027 Base 938 - 3,940.356 - 415.331 - 1,466.011 - 1,150.759 - 415.331 - - 1,150.759 - 1,150.759 - - 1,150.759 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 4,200.806 - 5,983.718 - 8,476.143 - 5,871.219 - - 5,871.219 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Unit Cost 938 3,197.468 4,566.278 Qty (Each) ($ M) ($ K) FY 2026 Total Cost Unit Cost 245 1,118.738 5,975.204 Qty (Each) ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost Vehicle Manufacturing (†) - Contractor 3,408.814 49 292.785 4,519.663 196 885.854 - - - 4,519.663 196 885.854 Government Furnished Material (GFM) - - 277.430 - - 242.245 - - 48.132 - - 160.046 - - - - - 160.046 Engineering Change Orders - - 83.624 - - 8.509 - - 2.609 - - 20.129 - - - - - 20.129 Sys Eng / Prog Mgmt (Government) - - 112.803 - - 21.494 - - 23.305 - - 24.470 - - - - - 24.470 Sys Test & Evaluation (Government) - - 10.508 - - 2.788 - - 1.735 - - 1.066 - - - - - 1.066 Training Devices - - 29.298 - - 1.241 - - 1.022 - - 1.073 - - - - - 1.073 Total Package Fielding (TPF) - - 94.230 - - 26.544 - - 25.033 - - 32.385 - - - - - 32.385 System Technical Support (STS) - - 134.995 - - 44.452 - - 20.710 - - 25.736 - - - - - 25.736 Subtotal: Recurring Cost - - 3,940.356 - - 1,466.011 - - 415.331 - - 1,150.759 - - - - - 1,150.759 - - 3,940.356 - - 1,466.011 - - 415.331 - - 1,150.759 - - - - - 1,150.759 938 3,940.356 245 1,466.011 49 415.331 196 1,150.759 - - - 196 1,150.759 Subtotal: Flyaway Cost Gross/Weapon System Cost 4,200.806 5,983.718 8,476.143 5,871.219 5,871.219 Remarks: LI 2944G80819 - Armored Multi Purpose Vehicle (AMPV) Army UNCLASSIFIED Page 4 of 10 P-1 Line #1 Volume 1 - 4 === page 35 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 10 P-1 Line Item Number / Title: 2944G80819 / Armored Multi Purpose Vehicle (AMPV) ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: G80819 / Armored Multi Purpose Vehicle (AMPV) MDAP/MAIS Code: FY 2027 Vehicle Manufacturing cost element increases from prior year to $885.854 million to procure 196 full rate production option year 5 vehicles. Vehicle production scales upward to align with Army production priorities. FY 2027 Government Furnished Material (GFM) cost element increases to $160.046 million to procure engines, transmissions, armor kits, and additional parts required to furnish 196 full rate production vehicles. FY 2027 Engineering Change Orders (ECOs) cost element increases at $20.129 million as modernized hardware supports the phasing in of composite rubber track. FY 2027 System Engineering / Program Management cost element slightly increases at $24.470 million as the program has transitioned to the Full Rate Production and Deployment phase. FY 2027 System Test & Evaluation cost element slightly decreases at $1.066 million. This cost element supports annual follow-on production testing requirement to ensure vehicles received from the production line are meeting quality standards. FY 2027 Training Device cost element remains consistent at $1.073 million. This cost element supports managing and regular maintenance of training devices to the latest AMPV configuration. FY 2027 Total Packaging Fielding cost increases to $32.385 million. This cost element supports AMPV fielding efforts to two sites in FY 2027. Efforts include deprocessing, fielding team support, conducting field modifications, training material refinement, and procuring initial spare parts to support the Army's fielding plans. FY 2027 System Technical Support cost element increases at $25.736 million. The substantial increase in vehicle production and subsequent fielding necessitates a corresponding increase in technical support to manage potential issues, software maintenance, and general logistics for a much larger fleet. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total 245 49 196 - 196 1,466.011 415.331 1,150.759 - 1,150.759 245 49 196 - 196 1,466.011 415.331 1,150.759 - 1,150.759 indicates the presence of a P-5a LI 2944G80819 - Armored Multi Purpose Vehicle (AMPV) Army UNCLASSIFIED Page 5 of 10 P-1 Line #1 Volume 1 - 5 === page 36 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 10 Cost Elements Vehicle Manufacturing (†) Contractor Vehicle Manufacturing (†) Contractor Vehicle Manufacturing (†) Contractor (†) O O C P-1 Line Item Number / Title: 2944G80819 / Armored Multi Purpose Vehicle (AMPV) Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: G80819 / Armored Multi Purpose Vehicle (AMPV) Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty FY Contractor and Location 2025 BAE Land Systems (FRP Option Year 3) / York, PA Option / FPIF Warren, MI Mar 2025 Jun 2027 245 4,566.278 N 2026 BAE Land Systems (FRP Option Year 4) / York, PA Option / FPIF Warren, MI Jun 2026 Jun 2028 49 5,975.204 N 2027 BAE Land Systems (FRP Option Year 5) / York, PA Option / FPIF Warren, MI Mar 2027 Mar 2029 196 4,519.663 N (Each) RFP Issue Date indicates the presence of a P-21 Remarks: FY 2027 total of $1,150.759 million supports the procurement of 196 vehicles in FY 2027. Minimum Sustaining Rate is five (5) per month and the Maximum Sustaining Rate is approximately 20 per month. There are no planned production breaks. The monthly production rate increased from the 12 vehicles per month demonstrated in Low Rate Initial Production (LRIP) to approximately 16-17 vehicles per month during Full Rate Production (FRP). FY 2025: Production Option Year 3 awarded 240 FRP vehicles in March 2025 on the FRP contract, an additional 5 vehicles will award on Production Option Year 4. FY 2026: Production Option Year 4, program intends to award 87 FRP vehicles no later than June 2026 on the FRP contract. 49 vehicles will be purchased with the Base funding and 38 vehicles with Mandatory funding. Delivery schedule will be adjusted once Mandatory funding is loaded into the database. FY 2027: Production Option Year 5, program intends to award 196 FRP vehicles in March 2027. The following P-21 delivery schedules are draft. FY 2026 AMPV quantities are subject to change pending final Full Rate Production (FRP) contract Option Year 4 negotiated pricing and agreed to delivery schedule, impact of additional procurement and, or economies of scale. There are no planned production breaks between Option Years 3, 4, and 5. FY 2026 delivery schedule is planned for June 2028-March 2029 and to be adjusted once system allows for Mandatory Funding quantity updates. LI 2944G80819 - Armored Multi Purpose Vehicle (AMPV) Army UNCLASSIFIED Page 6 of 10 P-1 Line #1 Volume 1 - 6 === page 37 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2944G80819 / Armored Multi Purpose Vehicle (AMPV) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: G80819 / Armored Multi Purpose Vehicle (AMPV) Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Vehicle Manufacturing - Contractor Prior Years Deliveries: 938 1 2025 ARMY 245 0 245 2 2026 ARMY 49 0 49 3 2027 ARMY 196 0 196 A - - - - - - - - - - - - - - - - - - - A - - - - 245 49 196 O C T N O V D E C J A N LI 2944G80819 - Armored Multi Purpose Vehicle (AMPV) Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 7 === page 38 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2944G80819 / Armored Multi Purpose Vehicle (AMPV) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: G80819 / Armored Multi Purpose Vehicle (AMPV) Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Vehicle Manufacturing - Contractor Prior Years Deliveries: 938 1 2025 ARMY 245 0 245 - - - - - - - - 20 20 20 20 20 20 20 21 21 21 21 21 2 2026 ARMY 49 0 49 - - - - - - - - - - - - - - - - - - - - 3 2027 ARMY 196 0 196 A O C T N O V D E C J A N LI 2944G80819 - Armored Multi Purpose Vehicle (AMPV) Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R A P R 0 5 M A Y 5 J U N 5 J U L 5 A U G - 29 196 S E P Volume 1 - 8 === page 39 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2944G80819 / Armored Multi Purpose Vehicle (AMPV) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: G80819 / Armored Multi Purpose Vehicle (AMPV) Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Vehicle Manufacturing - Contractor Prior Years Deliveries: 938 1 2025 ARMY 245 245 0 2 2026 ARMY 49 20 29 3 2027 ARMY 196 0 196 0 5 5 O C T 5 N O V 5 D E C 5 J A N LI 2944G80819 - Armored Multi Purpose Vehicle (AMPV) Army 4 F E B 0 13 M A R 17 A P R 17 M A Y 17 J U N 17 J U L 17 A U G UNCLASSIFIED Page 9 of 10 17 S E P 17 O C T 16 N O V 16 D E C 16 J A N 16 F E B P-1 Line #1 0 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 9 === page 40 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2944G80819 / Armored Multi Purpose Vehicle (AMPV) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 10 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: G80819 / Armored Multi Purpose Vehicle (AMPV) Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 BAE Land Systems (FRP Option Year 3) - York, PA 5 11 21 0 10 22 32 0 6 23 29 2 BAE Land Systems (FRP Option Year 4) - York, PA 5 11 21 0 10 22 32 0 6 23 29 3 BAE Land Systems (FRP Option Year 5) - York, PA 5 11 21 0 10 22 32 0 6 23 29 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 2944G80819 - Armored Multi Purpose Vehicle (AMPV) Army UNCLASSIFIED Page 10 of 10 P-1 Line #1 Volume 1 - 10 === page 41 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 10: 4872G84900 / ASSAULT BREACHER VEHICLE (ABV) Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0603804A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total 47 10 1 8 - 8 13 14 13 12 - 118 17.203 5.681 4.079 17.807 - 17.807 28.047 29.082 28.206 28.465 - 158.570 - - - - - - - - - - - 17.203 5.681 4.079 17.807 - 17.807 28.047 29.082 28.206 28.465 - - - - - - - - - - - - 17.203 5.681 4.079 17.807 - 17.807 28.047 29.082 28.206 28.465 - 158.570 158.570 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 366.021 568.100 4,079.000 2,225.875 - 2,225.875 2,157.462 2,077.286 2,169.692 2,372.083 - 1,343.814 Description: The Assault Breacher Vehicle (ABV) is a tracked combat engineer vehicle for the Army Armored Brigade Combat Team (ABCT) and Combat Engineer Company - Armor (CEC-A). It is designed to breach minefields and barrier obstacles to enable the ABCT and follow-on force to maintain pace in offensive combat operations. The Assault Breacher Vehicle provides crew protection and vehicle survivability equal to the M1A1 Abrams tank hull and has the speed and mobility to keep pace with the armor maneuver force. The Assault Breacher Vehicle hull is an overhauled M1A1 Abrams tank hull with upgrade to the M1A2 Abrams heavy suspension for its mission to support engineer companies within ABCTs. The ABV includes two Linear Demolition Charge Systems (modified Mine Clearing Line Charge (MICLC) systems); interchangeable Engineer Breaching System hardware consisting of a Full Width Mine Plow and a Combat Dozer Blade; a Lane Marking System to automatically mark a cleared path behind the Assault Breacher Vehicle; and an integrated day/night vision system. The production / acquisition strategy includes a partnership with Anniston Army Depot (ANAD) for the modification of the Abrams chassis for production of the Assault Breacher Vehicle (ABV). The Assault Breacher Vehicle Modification (MOD) budget line funds the modifications of assault bridging equipment. It is used to procure hardware, materials, and hardware installation cost required to complete the modification. Modifications are performed to correct safety deficiencies, increase mission capabilities, extend the useful life, improve supportability, upgrade existing technology, increase efficiency, address obsolescence, improve readiness, and to meet new legal and regulatory requirements. By modifying existing equipment, the Army maintains a ready, supportable inventory of equipment that meets current requirements and regulations at a cost considerable below that of buying new equipment. Installation costs are included in the cost of each hardware kit. There are fifty-one (51) Assault Breacher Vehicles - Harvested (ABV-H) from the United States Marine Corps (USMC). These vehicles are planned to undergo modifications to convert from the USMC to the Army standard configuration. Once the ABV-Hs meet Army standards, they will be fielded to units to achieve the Army Procurement Objective (APO). The Assault Breacher Vehicle Remote Control System (ABV-RCS) is a pre-planned product improvement to the ABV. The ABV-RCS is a remote controlled full-tracked combat engineer vehicle designed to breach minefields and complex obstacles. The RCS capability will remove Soldiers from manned breaching operations and reduce casualties. The ABV-RCS provides an in-stride breaching capability for the ABCT. The ABV-RCS budget line funds procurement of RCS kits to be installed on existing ABVs adding drive by wire and remote-control capability. The Assault Breacher Vehicle has an Army Acquisition Objective (AAO) of 223 and an Army Procurement Objective (APO) of 165. The Assault Breacher Vehicle - Remote Control System Army Procurement Objective (APO) is 39. LI 4872G84900 - ASSAULT BREACHER VEHICLE (ABV) Army UNCLASSIFIED Page 1 of 9 P-1 Line #3 Volume 1 - 11 === page 42 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 10: 4872G84900 / ASSAULT BREACHER VEHICLE (ABV) Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0603804A Line Item MDAP/MAIS Code: N/A Secondary Distribution Army Total: Secondary Distribution Quantity Total Obligation Authority FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 8 1 8 - 8 13 14 13 12 3.059 4.079 17.807 - 17.807 28.047 29.082 28.206 28.465 2 - - - - - - - - 2.622 - - - - - - - - Quantity Total Obligation Authority FY 2027 Base FY 2026 Quantity Total Obligation Authority ANG FY 2025 10 1 8 - 8 13 14 13 12 5.681 4.079 17.807 - 17.807 28.047 29.082 28.206 28.465 LI 4872G84900 - ASSAULT BREACHER VEHICLE (ABV) Army UNCLASSIFIED Page 2 of 9 P-1 Line #3 Volume 1 - 12 === page 43 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 10: 4872G84900 / ASSAULT BREACHER VEHICLE (ABV) Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0603804A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 G89012 / ASSAULT BREACHER VEHICLE MODS P-5 GA9013 / ASSAULT BREACHER VEHICLE - REMOTE CONTROL SYSTEM P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 47 / 17.203 10 / 5.681 1 / 4.079 5 / 14.232 - / - / - 3 / 3.575 - / - 3 / 3.575 1 / 4.079 8 / 17.807 - / - 8 / 17.807 - / - 47 / 17.203 - / - 10 / 5.681 - 5 / 14.232 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Base procurement dollars in the amount of $14.232 million supports the procurement of Assault Breacher Vehicle (ABV) government furnished equipment (GFE) required to modify 5 Assault Breacher Vehicle-Harvest (ABV-H) vehicles from the United States Marine Corps (USMC) to Army configuration as well as associated fielding and program support costs. FY 2027 Base procurement dollars in the amount of $3.575 million supports the refurbishment of 3 Assault Breacher Vehicle (ABV) - Remote Controlled Systems (RCS) test assets, fielding to the unit, and program support. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 4872G84900 - ASSAULT BREACHER VEHICLE (ABV) Army UNCLASSIFIED Page 3 of 9 P-1 Line #3 Volume 1 - 13 === page 44 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4872G84900 / ASSAULT BREACHER VEHICLE (ABV) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: G89012 / ASSAULT BREACHER VEHICLE MODS MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total 47 10 1 5 - 5 17.203 5.681 4.079 14.232 - 14.232 - - - - - - 17.203 5.681 4.079 14.232 - 14.232 - - - - - - 17.203 5.681 4.079 14.232 - 14.232 - - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 366.021 - 568.100 4,079.000 2,846.400 - - 2,846.400 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Integrated Vision System (IVS) (ABV- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - (†) - - - - - - 306.000 1 0.306 304.800 Embedded Diagnostics (ED) - - - - - - 452.000 1 0.452 162.400 (†) H) Integrated Vision System Spare Kit (IVS) (ABV-H) Linear Demolition Charge Sysytem (†) (LDCS) (ABV-H) Linear Demolition Charge System Spare Kit (LDCS) (ABV-H) Lane Marking System (†) (LMS) (ABV-H) Lane Marking System Spare Kit (LMS) (ABVH) High Lift Adapter (HLA) (ABV-H) (†) (ABV-H) LI 4872G84900 - ASSAULT BREACHER VEHICLE (ABV) Army 954.000 - 1 - 449.000 - - 1 0.449 - 316.000 - 0.954 1 0.316 - - UNCLASSIFIED Page 4 of 9 678.400 - 5 - - 0.067 - - - 1.514 - - - 0.141 - - - 1.572 - - - 0.687 - - - 5 1.524 - - - 304.800 5 1.524 5 0.812 - - - 162.400 5 0.812 5 - 314.400 - - - 302.800 - 3.392 5 - P-1 Line #3 678.400 - 5 - 302.800 - - 0.067 5 - 314.400 3.392 1.514 0.141 5 - 1.572 0.687 Volume 1 - 14 === page 45 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4872G84900 / ASSAULT BREACHER VEHICLE (ABV) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: G89012 / ASSAULT BREACHER VEHICLE MODS MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements ABV Hardware - A2 Unit Cost ($ K) Qty (Each) Unit Cost ($ M) ($ K) 47 10.372 - - - Data - - Fielding - - Transportation - - System Engineering/ Program Management - Subtotal: Recurring Cost - Qty (Each) Unit Cost ($ M) ($ K) - FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) - ($ K) 3.109 - - - 0.183 - - 0.136 - - 0.286 - 0.950 - - 2.095 - - 0.269 - 0.132 - - 0.057 - - 0.050 - 1.946 - - 0.284 - - - 13.583 - - 5.681 - - - - 13.583 - - 5.681 - - - 3.620 - - - - - 3.620 - - - - 3.620 - Support Equipment (ABV-H) - - - Subtotal: Recurring Cost - - - Subtotal: Package Fielding Cost - - - 47 17.203 Basic Issue Items/ Special Tools & Test Equipment (BII/STTE) 310.900 FY 2026 Total Cost 10 (†) Suspension Kit 220.681 FY 2025 Total Cost (Each) Unit Cost ($ M) (Each) Unit Cost ($ M) ($ K) (Each) ($ M) - 1.916 - - - - 0.300 - - - - - 0.300 - 0.712 - - - - - 0.712 - - 0.250 - - - - - 0.250 0.435 - - 0.450 - - - - - 0.450 3.900 - - 13.337 - - - - - 13.337 - 3.900 - - 13.337 - - - - - 13.337 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.179 - - 0.895 - - - - - 0.895 - - - - - 0.179 - - 0.895 - - - - - 0.895 - - - - - 0.179 - - 0.895 - - - - - 0.895 10 5.681 14.232 - - - 383.200 5 - Total Cost Qty - 0.383 - ($ K) Qty - 1 - Qty FY 2027 Total Total Cost - 383.000 - FY 2027 OOC Total Cost - 383.200 - 5 1.916 (†) (ABV-H) Subtotal: Hardware Cost Software Cost Non Recurring Cost ABV Software Upgrade Subtotal: Non Recurring Cost Subtotal: Software Cost Package Fielding Cost Recurring Cost Gross/Weapon System Cost 366.021 568.100 4,079.000 1 4.079 2,846.400 5 2,846.400 5 14.232 Remarks: ABV-H Mod: Starting with FY 2026, P-5 hardware cost element lists the government furnished equipment (GFE) to be procured for the ABV-H conversion / overhaul. FY 2027 hardware unit costs for the Integrated Vision System (IVS), Linear Demolition Charge System (LDCS), and Embedded Diagnostics (ED) are lower due to range pricing advantages of increased quantities. LI 4872G84900 - ASSAULT BREACHER VEHICLE (ABV) Army UNCLASSIFIED Page 5 of 9 P-1 Line #3 Volume 1 - 15 === page 46 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 10 P-1 Line Item Number / Title: 4872G84900 / ASSAULT BREACHER VEHICLE (ABV) ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: G89012 / ASSAULT BREACHER VEHICLE MODS MDAP/MAIS Code: The Integrated Vision System (IVS) and Lane Marking System (LMS) requires a spares kit for every 6 each produced. The Linear Demolition Charge System (LDCS) requires a spares kit for every 4 each produced. Secondary Distribution Army Quantity Total Obligation Authority ANG Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total 8 1 5 - 5 3.059 4.079 14.232 - 14.232 2 - - - - 2.622 - - - - 10 1 5 - 5 5.681 4.079 14.232 - 14.232 indicates the presence of a P-5a LI 4872G84900 - ASSAULT BREACHER VEHICLE (ABV) Army UNCLASSIFIED Page 6 of 9 P-1 Line #3 Volume 1 - 16 === page 47 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 10 Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: G89012 / ASSAULT BREACHER VEHICLE MODS FY Contractor and Location Method/Type or Funding Vehicle Integrated Vision System (IVS) (ABV-H) 2026 TBD / TBD C / FFP ACC Warren Dec 2026 Jul 2028 1 954.000 N Integrated Vision System (IVS) (ABV-H) 2027 TBD / TBD C / FFP ACC Warren Nov 2026 Apr 2027 5 678.400 N Linear Demolition Charge Sysytem (LDCS) (ABV-H) 2026 TBD / TBD C / FFP ACC Warren Dec 2026 Dec 2027 1 449.000 N Linear Demolition Charge Sysytem (LDCS) (ABV-H) 2027 TBD / TBD C / FFP ACC Warren Nov 2026 Apr 2027 5 302.800 N Lane Marking System (LMS) (ABVH) 2026 TBD / TBD C / FFP ACC Warren Sep 2026 Jul 2027 1 316.000 N Lane Marking System (LMS) (ABVH) 2027 TBD / TBD C / FFP ACC Warren Nov 2026 Apr 2027 5 314.400 N High Lift Adapter (HLA) (ABV-H) 2026 TBD / TBD C / FFP ACC Warren Sep 2026 Jul 2027 1 306.000 N High Lift Adapter (HLA) (ABV-H) 2027 TBD / TBD C / FFP ACC Warren Nov 2026 Apr 2027 5 304.800 N Embedded Diagnostics (ED) (ABVH) 2026 TBD / TBD C / FFP ACC Warren Sep 2026 Apr 2028 1 452.000 N Embedded Diagnostics (ED) (ABVH) 2027 TBD / TBD C / FFP ACC Warren Nov 2026 Apr 2027 5 162.400 N ABV Hardware - A2 Suspension Kit 2025 Anniston Army Depot / Anniston, AL WR Detroit Arsenal, MI Jun 2025 Dec 2025 10 310.900 N Basic Issue Items/Special Tools & Test Equipment (BII/STTE) (ABVH) 2026 TBD / TBD C / FFP ACC Warren Dec 2026 Jul 2028 1 383.000 N Basic Issue Items/Special Tools & Test Equipment (BII/STTE) (ABVH) 2027 TBD / TBD C / FFP ACC Warren Nov 2026 Apr 2027 5 383.200 N Cost Elements O O C P-1 Line Item Number / Title: 4872G84900 / ASSAULT BREACHER VEHICLE (ABV) Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date Remarks: FY 2025 Anniston Army Depot (ANAD) costs supported the Assault Breacher Vehicle A2 suspension upgrade modification to include kits and installations which corresponds to the ABV Hardware A2 Kit cost element on the P-5. FY 2026 and FY 2027 procurement funding only supports the acquisition of government furnished equipment (GFE) via contract for the Assault Breacher Vehicle Harvest (ABV-H) overhaul effort and the subsequent fielding of the vehicles to units. Integration of the GFE onto the ABV-H vehicles at Anniston Army Depot (ANAD) are the mission of the ILSC and supported by sustainment dollars. LI 4872G84900 - ASSAULT BREACHER VEHICLE (ABV) Army UNCLASSIFIED Page 7 of 9 P-1 Line #3 Volume 1 - 17 === page 48 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4872G84900 / ASSAULT BREACHER VEHICLE (ABV) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: GA9013 / ASSAULT BREACHER VEHICLE - REMOTE CONTROL SYSTEM MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) - - - 3 - 3 Gross/Weapon System Cost ($ in Millions) - - - 3.575 - 3.575 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - - 3.575 - 3.575 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - - 3.575 - 3.575 - - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - 1,191.667 - - 1,191.667 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost System Engineering & Program Support - - - - - - - - - - - 1.222 - - - - - 1.222 Subtotal: Recurring Cost - - - - - - - - - - - 1.222 - - - - - 1.222 - - - - - - - - - 0.750 - - - - - - - - - - - - - - 0.750 - - - - - 0.750 - - - - - - - - - - - 1.972 - - - - - 1.972 Initial Spares & Repair Parts - - - - - - - - - - - 0.056 - - - - - 0.056 Contracted Logistics Support - - - - - - - - - - - 0.106 - - - - - 0.106 Subtotal: Recurring Cost - - - - - - - - - - - 0.162 - - - - - 0.162 - - - - - - - - - - - 0.162 - - - - - 0.162 Non Recurring Cost Test Asset Refurbishment Subtotal: Non Recurring Cost Subtotal: Flyaway Cost 250.000 3 250.000 3 0.750 Hardware Cost Recurring Cost Subtotal: Hardware Cost Package Fielding Cost Recurring Cost LI 4872G84900 - ASSAULT BREACHER VEHICLE (ABV) Army UNCLASSIFIED Page 8 of 9 P-1 Line #3 Volume 1 - 18 === page 49 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4872G84900 / ASSAULT BREACHER VEHICLE (ABV) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: GA9013 / ASSAULT BREACHER VEHICLE - REMOTE CONTROL SYSTEM MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost Qty ($ K) FY 2027 Total Total Cost (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) New Equipment Training - - - - - - - - - - - 0.178 - - - - - 0.178 First Destination Transportation - - - - - - - - - - - 0.003 - - - - - 0.003 Subtotal: Recurring Cost - - - - - - - - - - - 0.181 - - - - - 0.181 Subtotal: Package Fielding Cost - - - - - - - - - - - 0.181 - - - - - 0.181 - - - - - - - - - - - 1.260 - - - - - 1.260 - - - - - - - - - - - 1.260 - - - - - 1.260 Subtotal: Logistics Cost - - - - - - - - - - - 1.260 - - - - - Gross/Weapon System Cost - - - - - - - - - 3.575 - - - Logistics Cost Recurring Cost Data Subtotal: Recurring Cost 1,191.667 3 1,191.667 1.260 3 3.575 Remarks: SSN GA9013 / ASSAULT BREACHER VEHICLE - REMOTE CONTROL SYSTEM is a new start within the ASSAULT BREACHER VEHICLE (ABV) program in FY 2027. FY 2027 Data Cost Element funds the completion of the Technical Manual effort. FY 2025 Research, Development, Test and Evaluation funded the development of the Assault Breacher Vehicle (ABV) Remote Control System (RCS) test assets under program element (PE) 0603804A / Logistics and Engineer Equipment - Adv Dev project EW8 Armored Engineer Vehicles. Secondary Distribution Army Total: Secondary Distribution FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total Quantity - - 3 - 3 Total Obligation Authority - - 3.575 - 3.575 Quantity - - 3 - 3 Total Obligation Authority - - 3.575 - 3.575 LI 4872G84900 - ASSAULT BREACHER VEHICLE (ABV) Army UNCLASSIFIED Page 9 of 9 P-1 Line #3 Volume 1 - 19 === page 50 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 10: 7181G80820 / M10 BOOKER Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0604645A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 1,017.070 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 70 154 6.479 - - - - - - - 1,388.654 2,851.314 439.111 1,017.070 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2026 84 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2025 439.111 1,017.070 439.111 To FY 2031 Complete - - - - - - - - 6.479 - - - - - - - - - - - - - - - 6.479 - - - - - - - Total - - 1,388.654 2,851.314 - - 1,388.654 2,851.314 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 12,107.976 19,837.914 18,515.026 Description: The M10 Booker (formerly, Mobile Protected Firepower (MPF)) will provide the Army's Infantry Brigade Combat Teams (IBCTs) a protected, long range, precision direct-fire capability to ensure freedom of movement during offensive operations and defeat attacking enemy during defensive operations. Secondary Distribution Army FY 2025 Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2027 Base FY 2026 - 439.111 439.111 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - 6.479 - - - - - - - - - - - - - - - 6.479 - - - - - - - Justification: There is no Fiscal Year 2027 budget request for this funding line. On 11 June 2025, the Government issued a partial Termination for Convenience (T4C) to General Dynamic Land Systems (GDLS) and instructed to cease all activities that are not in the best interest of the United States Government and there was no planned M10 Booker vehicle buy in FY 2025. LI 7181G80820 - M10 BOOKER Army UNCLASSIFIED Page 1 of 1 P-1 Line #4 Volume 1 - 20 === page 51 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 10: 7241G86000 / XM30 MECHANIZED INFANTRY COMBAT VEHICLE (MICV) Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0605265A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - 19 - 19 48 65 86 108 - 326 Gross/Weapon System Cost ($ in Millions) - - - 546.990 - 546.990 995.047 1,463.575 1,774.080 2,151.128 - 6,930.820 Less PY Advance Procurement ($ in Millions) - - - Net Procurement (P-1) ($ in Millions) - - - Plus CY Advance Procurement ($ in Millions) - - - Total Obligation Authority ($ in Millions) - - - - - 546.990 - - - 546.990 - 546.990 - - 546.990 - - 995.047 - 1,463.575 - - 995.047 - 1,774.080 - 1,463.575 - 2,151.128 - - 1,774.080 6,930.820 - 2,151.128 - 6,930.820 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - 28,788.947 - 28,788.947 20,730.146 22,516.538 20,628.837 19,917.852 - 21,260.184 Description: The XM30 Mechanized Infantry Combat Vehicle is a cornerstone of the Armored Brigade Combat Team (ABCT), designed to enhance lethality, survivability, and maneuverability in high-intensity combat against near-peer adversaries. The XM30 integrates seamlessly into the ABCT's combined arms structure, working alongside the M1 Abrams Main Battle Tank and dismounted infantry to achieve tactical and operational objectives. The XM30 rapidly delivers informed, combat-ready infantry to assigned objectives while protecting them under armor and providing lethal direct fire in support of dismounted operations. In the close fight, it detects and destroys targets at ranges beyond the enemy's capability, enabling infantry maneuver and securing tactical advantage. The XM30 is versatile in its operational roles, capable of leading the charge, scouting ahead, or providing overwatch while Soldiers dismount and maneuver. Its ability to control robotic systems and semi-autonomous platforms adds another layer of capability, allowing the formation to extend its reach and maintain dominance across the battlefield. Operating as part of a cohesive section, platoon, and company of mechanized infantry, the XM30 executes multi operational domain maneuvers to defeat pacing threats. Once the unit transitions to the combined mounted and dismounted fight, the XM30 supports dismounted infantry with advanced sensors, precision lethality, robust protection, and integrated mission command capabilities. This synergy between the XM30, Abrams, and infantry is crucial to the ABCT's ability to dominate the battlefield. The XM30 program is not just a replacement for the Bradley Fighting Vehicle-it represents a transformative leap in ground combat vehicle development. The XM30 is more than a vehicle; it is a software-defined platform designed for interoperability and adaptability, ensuring it evolves with changing technologies and operational demands. Unlike past programs, the Army will not be locked into a static design for 30 years. Instead, the XM30 will continuously adapt to meet future challenges, making it a cornerstone of the Army's vision for combat readiness and modernization. By leveraging digital engineering and modular open systems architecture (MOSA), the XM30 ensures infantry units always have the cutting-edge tools they need to outmaneuver and outgun the enemy. The XM30 also achieves a level of logistical efficiency that ensures sustained operational readiness while reducing costs and complexity. These approaches enable the Army to predict and address maintenance needs proactively, streamline supply chain management and reduce inventory requirements, and adapt the vehicle to evolving threats and technologies without major overhauls. This adaptability ensures the ABCT remains a decisive force capable of executing combined arms maneuvers and achieving tactical objectives in future conflicts. The XM30's integration of Modular Open Systems Architecture (MOSA), advanced sensors, semi-autonomous systems, and robotic platforms reflects the Army's broader modernization strategy, which emphasizes interoperability, adaptability, and technological innovation. These principles are foundational to the Next Generation Combat Command and Control (NGC2) initiatives, ensuring a cohesive and unified approach across the Army's systems. This synergy is critical to the Army's ability to fight and win in future conflicts. Secondary Distribution Army Quantity FY 2025 FY 2027 Base FY 2026 - LI 7241G86000 - XM30 MECHANIZED INFANTRY COMBAT VEHICLE ... Army - FY 2027 OOC 19 UNCLASSIFIED Page 1 of 9 FY 2027 Total - FY 2028 19 P-1 Line #5 FY 2029 48 FY 2030 65 FY 2031 86 61 Volume 1 - 21 === page 52 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 10: 7241G86000 / XM30 MECHANIZED INFANTRY COMBAT VEHICLE (MICV) Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0605265A Line Item MDAP/MAIS Code: N/A Secondary Distribution ANG Total: Secondary Distribution FY 2025 FY 2027 Base FY 2026 FY 2027 OOC 995.047 FY 2030 Quantity - - - - - - - - 47 Total Obligation Authority - - - - - - - - 936.139 Quantity - - 19 - 19 48 65 86 108 Total Obligation Authority - - 546.990 - 546.990 995.047 1,463.575 1,774.080 2,151.128 P-1 Line #5 1,463.575 FY 2031 - Page 2 of 9 546.990 FY 2029 - UNCLASSIFIED - FY 2028 Total Obligation Authority LI 7241G86000 - XM30 MECHANIZED INFANTRY COMBAT VEHICLE ... Army 546.990 FY 2027 Total 1,774.080 1,214.989 Volume 1 - 22 === page 53 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 10: 7241G86000 / XM30 MECHANIZED INFANTRY COMBAT VEHICLE (MICV) Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0605265A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 G86000 / XM30 MECHANIZED INFANTRY COMBAT VEHICLE (MICV) P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / - - / - 19 / 546.990 - / - 19 / 546.990 - / - - / - - / - 19 / 546.990 - / - 19 / 546.990 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 base procurement funding, totaling $546.990 million, is allocated to support the production of the XM30 Combat Vehicle. This funding is critical to ensuring the XM30 achieves operational readiness and delivers the capabilities required to support Armored Brigade Combat Teams (ABCTs) in future conflicts. The funding will enable the production of up to 19 XM30 vehicles, hulls and turrets, marking a significant milestone in the program's transition from prototyping to operational fielding. While the prime contractor(s) has not yet been identified, award decisions will be based on contractor performance during the Middle Tier Acquisition - Rapid Prototyping (MTA-RP) phase, results from Preproduction Prove-out Testing (PPT), and Soldier feedback gathered through operational evaluations. These LRIP vehicles will undergo Production Qualification Testing (PQT) and Initial Operational Test and Evaluation (IOT&E) to validate their performance and suitability for fielding. Following successful testing, the vehicles will be delivered to an Active Component ABCT, achieving First Unit Equipped (FUE). In addition to vehicle production, FY 2027 base procurement funding will support several critical enablers to ensure the XM30 is fully operational and integrated into Army formations. This includes the procurement of Government Furnished Material (GFM) necessary for operating the XM30 in Full Combat Configuration (FCC). The funding will also establish a System Integration Laboratory (SIL) to assess software interoperability and architectural compliance, ensuring the XM30 integrates seamlessly with existing and emerging Army systems. Furthermore, initial training devices will be procured to support soldier training activities, ensuring units are prepared to operate and maintain the XM30 effectively as it enters service. The funding allocation also provides essential program management and oversight to ensure the successful execution of the XM30 production effort. This includes engineering support to maintain design integrity and performance compliance, logistics planning to reduce operational burdens and product assurance to validate that production vehicles meet all operational requirements. Additionally, contracting and financial management support will ensure efficient execution of program resources and adherence to contractual obligations. This comprehensive investment strategy ensures the XM30 program remains on track to deliver a capable, lethal, and sustainable platform that meets the operational demands of the modern battlefield while supporting the Army's broader modernization objectives. In accordance with section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110 - 181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 7241G86000 - XM30 MECHANIZED INFANTRY COMBAT VEHICLE ... Army UNCLASSIFIED Page 3 of 9 P-1 Line #5 Volume 1 - 23 === page 54 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 7241G86000 / XM30 MECHANIZED INFANTRY COMBAT VEHICLE (MICV) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: G86000 / XM30 MECHANIZED INFANTRY COMBAT VEHICLE (MICV) MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) - - - 19 - 19 Gross/Weapon System Cost ($ in Millions) - - - 546.990 - 546.990 Less PY Advance Procurement ($ in Millions) - - - Net Procurement (P-1) ($ in Millions) - - - Plus CY Advance Procurement ($ in Millions) - - - Total Obligation Authority ($ in Millions) - - - - - 546.990 - - - 546.990 - 546.990 - - 546.990 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - 28,788.947 - - 28,788.947 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost (†) - - - - - - - - - 4,535.526 19 86.175 - - - 4,535.526 19 86.175 - - - - - - - - - 15,117.421 19 287.231 - - - 15,117.421 19 287.231 - - - - - - - - - 6,538.211 19 124.226 - - - 6,538.211 19 124.226 - - - - - - - - - - - 497.632 - - - - - 497.632 - - - - - - - - - - - 497.632 - - - - - 497.632 Government Furnished Equipment - - - - - - - - - - - 33.067 - - - - - 33.067 Subtotal: Recurring Cost - - - - - - - - - - - 33.067 - - - - - 33.067 - - - - - - - - - - - 33.067 - - - - - 33.067 Training Devices Production - - - - - - - - - - - 5.843 - - - - - 5.843 Subtotal: Non Recurring Cost - - - - - - - - - - - 5.843 - - - - - 5.843 - - - - - - - - - - - 5.843 - - - - - 5.843 Vehicle End Item Hull/Chassis Turret (†) (†) Subtotal: Recurring Cost Subtotal: Flyaway Cost Hardware Cost Recurring Cost Subtotal: Hardware Cost Logistics Cost Non Recurring Cost Subtotal: Logistics Cost Support - Program Management Cost LI 7241G86000 - XM30 MECHANIZED INFANTRY COMBAT VEHICLE ... Army UNCLASSIFIED Page 4 of 9 P-1 Line #5 Volume 1 - 24 === page 55 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 7241G86000 / XM30 MECHANIZED INFANTRY COMBAT VEHICLE (MICV) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: G86000 / XM30 MECHANIZED INFANTRY COMBAT VEHICLE (MICV) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Government Management Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - - - - - - - - - - 10.448 - - - - - 10.448 Subtotal: Support - Program Management Cost - - - - - - - - - - - 10.448 - - - - - 10.448 Gross/Weapon System Cost - - - - - - - - - 19 546.990 - - - 19 546.990 28,788.947 28,788.947 Remarks: The XM30 vehicle cost specifically covers the direct costs of integrating the turret onto the chassis, including the necessary labor and materials. This cost does not include the labor and materials for manufacturing the hull and turret themselves. The full cost of an XM30 from this funding line is calculated by combining these separate costs: Total Cost = Vehicle Integration Cost + Turret Cost + Chassis Cost" Secondary Distribution Army Total: Secondary Distribution (†) FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total Quantity - - 19 - 19 Total Obligation Authority - - 546.990 - 546.990 Quantity - - 19 - 19 Total Obligation Authority - - 546.990 - 546.990 indicates the presence of a P-5a LI 7241G86000 - XM30 MECHANIZED INFANTRY COMBAT VEHICLE ... Army UNCLASSIFIED Page 5 of 9 P-1 Line #5 Volume 1 - 25 === page 56 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 10 FY Contractor and Location 2027 TBD / TBD C / TBD TBD Sep 2027 Jul 2029 19 4,535.526 N Hull/Chassis 2027 TBD / TBD C / TBD TBD Sep 2027 Jul 2029 19 15,117.421 N (†) 2027 TBD / TBD C / TBD TBD Sep 2027 Jul 2029 19 6,538.211 N (†) Vehicle End Item (†) Turret (†) Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: G86000 / XM30 MECHANIZED INFANTRY COMBAT VEHICLE (MICV) Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 7241G86000 / XM30 MECHANIZED INFANTRY COMBAT VEHICLE (MICV) Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 7241G86000 - XM30 MECHANIZED INFANTRY COMBAT VEHICLE ... Army UNCLASSIFIED Page 6 of 9 P-1 Line #5 Volume 1 - 26 === page 57 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 7241G86000 / XM30 MECHANIZED INFANTRY COMBAT VEHICLE (MICV) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: G86000 / XM30 MECHANIZED INFANTRY COMBAT VEHICLE (MICV) Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Vehicle End Item 1 2027 ARMY 19 0 19 A - - - - - - - - - - - - - 19 2027 ARMY 19 0 19 A - - - - - - - - - - - - - 19 2027 ARMY 19 0 19 - 19 Hull/Chassis 2 Turret 3 A O C T N O V D E C J A N F E B LI 7241G86000 - XM30 MECHANIZED INFANTRY COMBAT VEHICLE ... Army M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 9 S E P O C T N O V D E C J A N F E B P-1 Line #5 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 27 === page 58 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 7241G86000 / XM30 MECHANIZED INFANTRY COMBAT VEHICLE (MICV) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: G86000 / XM30 MECHANIZED INFANTRY COMBAT VEHICLE (MICV) Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Vehicle End Item 1 2027 ARMY 19 0 19 - - - - - - - - - 1 1 1 1 1 2 2 2 2 2 2 2 0 2027 ARMY 19 0 19 - - - - - - - - - 1 1 1 1 1 2 2 2 2 2 2 2 0 2027 ARMY 19 0 19 Hull/Chassis 2 Turret 3 O C T N O V D E C J A N F E B LI 7241G86000 - XM30 MECHANIZED INFANTRY COMBAT VEHICLE ... Army M A R A P R M A Y J U N 1 J U L 1 A U G UNCLASSIFIED Page 8 of 9 1 S E P 1 O C T 1 N O V 2 D E C 2 J A N 2 F E B P-1 Line #5 2 M A R 2 A P R 2 M A Y 2 J U N 0 J U L A U G S E P Volume 1 - 28 === page 59 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 7241G86000 / XM30 MECHANIZED INFANTRY COMBAT VEHICLE (MICV) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 10 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: G86000 / XM30 MECHANIZED INFANTRY COMBAT VEHICLE (MICV) Procurement Leadtime (Months) Initial ALT After Oct 1 Reorder MSR For 2027 1-8-5 For 2027 MAX For 2027 ALT Prior to Oct 1 1 TBD - TBD 1 2 3 20 0 22 22 0 0 0 0 2 TBD - TBD 1 2 3 20 0 22 22 0 0 0 0 3 TBD - TBD 1 2 3 20 0 22 22 0 0 0 0 Manufacturer Name - Location Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 7241G86000 - XM30 MECHANIZED INFANTRY COMBAT VEHICLE ... Army UNCLASSIFIED Page 9 of 9 P-1 Line #5 Volume 1 - 29 === page 60 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: 0230GM0100 / Stryker (Mod) Modification of Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0203735A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 1,365.371 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 52.471 - - - - - - - - - 1,365.371 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2026 - Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2025 - - - - - - - - - - 52.471 - - - - - - - - - - - - - - - - - - - 52.471 - - - - - - - - - 1,365.371 To FY 2031 Complete Total 1,417.842 1,417.842 1,417.842 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Stryker (Mod) funding line will fund procurement of Stryker Double-V Hull A1 Commander's Vehicles and related fielding costs to provide Command Post Integrated Infrastructure (CPI2) to the Stryker Brigade Combat Team (SBCT). As one of the Army's top network priorities, CPI2 technologies will be integrated with legacy mission command systems, onto a variation of the Stryker Commander's Vehicle. The integrated systems will provide a mobile and survivable command post solution to the Stryker Brigade Combat Team (SBCT), enabling on-the-move mission command across wider ranges at both the Brigade and Battalion echelons. Secondary Distribution Army FY 2025 Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 52.471 - - - - - - - - - - - - - - - - - 52.471 - - - - - - - - Justification: There is no Fiscal Year 2027 budget request for this funding line. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 0230GM0100 - Stryker (Mod) Army UNCLASSIFIED Page 1 of 1 P-1 Line #6 Volume 1 - 30 === page 61 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: 0363G85200 / Stryker Upgrade Modification of Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0203735A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 1,595 6,312.982 6,312.982 6,312.982 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 1,595 28.558 45.725 - 45.725 - - - - - 6,805.362 - - - - - - - - - 28.558 45.725 - 45.725 - - - - - - - - - - - - - - 28.558 45.725 - 45.725 - - - - - 418.097 418.097 418.097 To FY 2031 Complete Total 6,805.362 6,805.362 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 3,957.982 4,266.685 Description: The FY 2026 spend plan amount for Stryker Upgrade includes $28,558 thousand of discretionary and $230,000 thousand of mandatory (reconciliation) for a total of $258,558 thousand. The evolving nature of dynamic, asymmetric threats and complex operational environments necessitates strategically responsive, agile, and dominant land forces capable of full-spectrum operations. To meet the Army's warfighting requirements, immediate response by a lethal, versatile, and tactically agile joint force capable of operational maneuver is essential. The Stryker-equipped Brigade Combat Team (BCT) embodies this capability. Its common platform and chassis design significantly reduce repair part requirements and logistics support within the area of operations, enhancing operational efficiency. In response to operational needs identified in the Theater of Operations, the Stryker Double-V-Hull (DVH) survivability enhancement was approved for development and production through Acquisition Decision Memorandums (ADM) signed in April 2010 and May 2011. The DVH brigade is constructed through an exchange process, where components and mission equipment packages are removed from existing flat-bottom hull Strykers, refurbished and reassembled into the DVH structure, incorporating DVH-specific components. In May 2012, Phase I (Technology Development) of the Stryker Double-V-Hull (DVH) A1 Engineering Change Proposal (DVH A1 ECP), formerly known as ECP1, was approved. This effort aimed to restore Space, Weight, and Power-Cooling (SWaP-C) capabilities lost due to vehicle modifications required to counter threats encountered during deployment operations. The upgrades included enhancements to power generation, suspension, and network systems. Phase II of the DVH A1 ECP development effort was approved in May 2013, and production approval followed in August 2016. DVH A1 ECP vehicles were produced using the exchange production process, ensuring the integration of survivability and operational enhancements. Stryker Brigade Combat Teams (SBCTs) equipped with DVH A1 ECP vehicles are designed to operate across the full spectrum of military operations. These units are required to deploy rapidly and conduct effective combat operations immediately upon arrival, enabling them to prevent, contain, stabilize, or resolve conflicts through shaping and decisive operations. On 23 March 2018, the Army Requirements Oversight Council (AROC) approved the exchange of all remaining flat-bottom hull Stryker Brigades to the DVH A1 ECP configuration. To support this transition, the Program Office awarded a follow-on DVH A1 ECP requirements contract on 30 June 2020, covering FY 2020-2025, with an additional one-year option. Production under this contract utilized a blend of new vehicle production and the existing exchange process, as the limited inventory of flat-bottom hull Strykers constrained the exchange production process. Configurations of Stryker Double-V-Hull (DVH) A1 Engineering Change Proposal vehicles consist of seven (7) variants listed below: - DVH A1 Infantry Carrier: The DVH A1 Infantry Carrier Vehicle (ICVVA1) carries an infantry squad with individual equipment. The Infantry Carrier Vehicle also provides protected transport and supporting fires for the infantry squad during dismounted assault. DVH A1 Infantry Carrier Vehicles with a Scout Dismount Kit provide for dismounted force situational awareness, gathering, and transmitting real time intelligence while moving throughout the battlefield in close, complex, and urban terrain. LI 0363G85200 - Stryker Upgrade Army UNCLASSIFIED Page 1 of 7 P-1 Line #7 Volume 1 - 31 === page 62 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: 0363G85200 / Stryker Upgrade Modification of Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0203735A Line Item MDAP/MAIS Code: N/A - DVH A1 Mortar Carrier: The DVH A1 Mortar Carrier (MCVVA1) supports infantry units with screening obscurants, suppressive forces and on-call supporting fires. 120mm, 81mm, and 60mm mortars provide complementary capabilities with responsive, accurate and lethal indirect fire support to the dismounted infantry assault. - DVH A1 Commander's Vehicle: The DVH A1 Commander's Vehicle (CVVA1) provides the brigade commanders and infantry battalion commanders with the means to receive information and data, analyze, prepare, and transmit data, and control the forces/functions carrying out combat missions. - DVH A1 Fire Support Vehicle: The DVH A1 Fire Support Vehicle (FSVVA1) provides automated enhanced surveillance, target acquisition, target identification, target tracking, target designation, position location, and communications functionality. Targets will be transmitted instantly to the fire support system and shooter. - DVH A1 Engineer Squad Vehicle: The DVH A1 Engineer Squad Vehicle (ESVVA1) provides maneuver/mobility support capabilities which include obstacle clearing, in-stride breaching of surface mines, proofing of subsurface mines, and smoke generation for local protection. - DVH A1 Medical Evacuation Vehicle: The DVH A1 Medical Evacuation Vehicle (MEVVA1) is the Battalion Aid Station for brigade units, providing treatment for serious injury and advanced trauma cases. - DVH A1 Infantry Carrier Vehicle-30mm (ICVVA1-30mm, formerly Medium Caliber Weapon System (MCWS)): The Stryker ICVVA1-30mm integrates a 30mm cannon onto the DVHA1 platform to provide increased lethality, capable of firing a variety of munitions designed to support mounted and dismounted elements when executing combined arms maneuver and wide area security operations. The ICVVA1-30mm provides protected transport for an infantry or cavalry squad with individual equipment. The Stryker Family of Vehicles (FoV) program focuses on designing, developing, modifying, and documenting solutions to address configuration management, reliability, lethality, safety, operational performance degradation, chemical detection, and Command, Control, Communications, Computers, Cyber, Intelligence, Surveillance, and Reconnaissance (C5ISR) obsolescence issues. Key efforts include testing and implementing fleet modifications such as C5ISR updates, DVH safety and survivability enhancements, training device procurement, and retrofitting lethality upgrades to improve suppressive fire and armored vehicle engagement capabilities for the Army's Stryker Brigade Combat Teams (SBCTs). Specific upgrades include ICVVA1-30mm hardware fixes, ICVVA1-30mm Contact Fuze Setter procurement, replacement of the obsolete Video Display Electronics Terminal (VDET) with Squad Leader Display (SLDv3), electronics power system enhancements to support Mounted-Integrated Tactical Network Stryker (M-ITN-S) integration, and other updates to address evolving threats, emerging technologies, and system deficiencies. Package Fielding / System Fielding Support: Funding supports the fielding of DVH A1 vehicles including the ICVVA1-30mm (formerly Medium Caliber Weapon System (MCWS)). Activities include vehicle transportation and delivery, deprocessing, New Equipment Training (NET), fielding support, interim contractor logistics support for ICVVA1-30mm (MCWS), field service representative support, and vehicle maintenance prior and during fielding activities. Training Aids, Devices, Simulators, and Simulations (TADSS): Funding supports the integration of the Vehicle Tactical Engagement Simulation System (V-TESS) and Javelin Outdoor Training System (JOTS), as well as the establishment of the Stryker-unique 91S Military Occupational Specialty (MOS) training course. Required training devices include Diagnostic Troubleshooting Trainers (DTTs), Anti-Tank Guided Missile Vehicle Hands-On Trainers (HOTs), Full-Up Power Pack Part Task Trainers (FUPP PTTs), and Mortar Carrier Hands-On Trainers (MC HOTs). Retrofit Planning and Site Management: Funding supports kit material handling and fleet-wide retrofits for the Stryker Family of Vehicles (FoV). Test Fleet Maintenance: Funding ensures the maintenance of the Stryker test fleet, including contractor repair labor and operations of Stryker repair parts warehouses at Army test centers. Program management, engineering, and logistics support necessary to execute Stryker modifications to include Double V Hull A1 (DVHA1) Engineering Change Proposals (ECPs); Fleet Modifications; Command, Control, Communications, Computers, Cyber, Intelligence, Surveillance, and Reconnaissance (C5ISR); Next Generation items, and Lethality Engineering Change Proposals (ECPs). LI 0363G85200 - Stryker Upgrade Army UNCLASSIFIED Page 2 of 7 P-1 Line #7 Volume 1 - 32 === page 63 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: 0363G85200 / Stryker Upgrade Modification of Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0203735A Line Item MDAP/MAIS Code: N/A Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 0363G85200 - Stryker Upgrade Army FY 2025 FY 2027 Base FY 2026 - 418.097 418.097 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - 28.558 45.725 - 45.725 - - - - - - - - - - - - 28.558 45.725 - 45.725 - - - - UNCLASSIFIED Page 3 of 7 P-1 Line #7 Volume 1 - 33 === page 64 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: 0363G85200 / Stryker Upgrade Modification of Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0203735A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 G85200 / Stryker Upgrade P-40 Total Gross/Weapon System Cost Subexhibits ID CD A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 1,595 / 6,312.982 - / 418.097 - / 28.558 - / 45.725 - / - - / 45.725 1,595 / 6,312.982 - / 418.097 - / 28.558 - / 45.725 - / - - / 45.725 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Base procurement dollars in the amount of $45.725 million supports the following: - Fielding Support for Double-V Hull A1 (DVHA1) including New Equipment Training, transportation, interim Contractor Logistics Support for Infantry Carrier Vehicle-30mm (ICVVA1)-30mm (formerly Medium Caliber Weapon System (MCWS)), and Field Service Representative (FSR) support. - Infantry Carrier Vehicle-30mm (ICVVA1)-30mm (formerly Medium Caliber Weapon System (MCWS)) Contact Fuze Setter procurement to support new ammunition firing. - Program management, engineering, logistics and system technical support necessary to execute DVHA1 fielding activities and remaining logistic products. Fielding efforts for the 4th and 5th DVH A1 brigades, as well as the 3rd and 4th Infantry Carrier Vehicle-30mm (ICVVA1-30mm, formerly Medium Caliber Weapon System (MCWS)) brigades, will continue through at least FY 2029. These fielding efforts ensure delivery of previously procured capability to the field as well as the continued operational effectiveness of Stryker Brigade Combat Teams in addressing current and emerging threats. Army Acquisition Objective: 4,459 The Army Acquisition Objective includes quantity requirements for Stryker Brigade Combat Teams and other Army programs of record which utilize the Stryker vehicle as their base platform. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 0363G85200 - Stryker Upgrade Army UNCLASSIFIED Page 4 of 7 P-1 Line #7 Volume 1 - 34 === page 65 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0363G85200 / Stryker Upgrade Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: G85200 / Stryker Upgrade MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 1,595 Gross/Weapon System Cost ($ in Millions) 6,312.982 Less PY Advance Procurement ($ in Millions) 418.097 - Net Procurement (P-1) ($ in Millions) 418.097 - Total Obligation Authority ($ in Millions) FY 2027 OOC - - - 28.558 45.725 - 45.725 - - - - 28.558 45.725 - 45.725 - - - - 28.558 45.725 - 45.725 - 6,312.982 Plus CY Advance Procurement ($ in Millions) FY 2027 Base - - - 6,312.982 418.097 FY 2027 Total (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) 3,957.982 - - - - - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost DVH A1 ECP Infantry Carrier Vehicle 3,383.969 685 2,318.019 - - - - - - - - - - - - - - - DVH A1 ECP AntiTank Guided Missile Veh 3,097.290 31 96.016 - - - - - - - - - - - - - - - DVH A1 ECP Mortar Carrier Vehicle 2,944.653 170 500.591 - - - - - - - - - - - - - - - DVH A1 ECP Fire Support Vehicle 2,923.833 60 175.430 - - - - - - - - - - - - - - - DVH A1 ECP Engineer Squad Vehicle 2,461.833 66 162.481 - - - - - - - - - - - - - - - DVH A1 ECP Commander's Vehicle 2,877.476 147 422.989 - - - - - - - - - - - - - - - DVH A1 ECP Medical Evacuation Vehicle 2,133.283 145 309.326 - - - - - - - - - - - - - - - DVH A1 30mm MCWS 5,638.387 142 800.651 - - - - - - - - - - - - - - - Program Management Support (Govt) - - 278.622 - - 33.618 - - 18.112 - - 5.061 - - - - - 5.061 Government Furnished Equipment (GFE) - - 52.818 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 5,116.943 - - 33.618 - - 18.112 - - 5.061 - - - - - 5.061 - - 5,116.943 - - 33.618 - - 18.112 - - 5.061 - - - - - 5.061 Subtotal: Flyaway Cost LI 0363G85200 - Stryker Upgrade Army UNCLASSIFIED Page 5 of 7 P-1 Line #7 Volume 1 - 35 === page 66 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0363G85200 / Stryker Upgrade Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: G85200 / Stryker Upgrade MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Fleet Modifications - - 52.450 CROWS-J ECP - - 106.428 ATGM ECP - - 35.575 MCWS 30mm - - 20.036 Squad Leader Display v3 (SLDv3) - - M-ITN Power Solution Hardware - - - - - - - - - - - - - - - - 230 63.370 - - - - - - - - - - - - - - - - - - - - - - - - - - 124.089 269 33.380 - - - - - 18.000 - - - - - 18.000 19.864 81.326 270 21.958 - - - - - - - - - - - - - 91.306 320 29.218 - - - - - - - - - - - - Subtotal: Recurring Cost - - - - 234.353 - - 147.926 - - - - - 18.000 - - - - - 18.000 234.353 - - 147.926 - - - - - 18.000 - - - - - 18.000 System Fielding Support - DVH A1 - Subtotal: Recurring Cost - - 307.088 - - 151.145 - - - - - 19.030 - - - - - 19.030 - 307.088 - - 151.145 - - - - - 19.030 - - - - - 19.030 Authorized Stockage List - DVH A1 - - 174.997 - - 25.955 - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 174.997 - - 25.955 - - - - - - - - - - - - Subtotal: Package Fielding Cost - - 482.085 - - 177.100 - - - - - 19.030 - - - - - 19.030 Retrofit Planning and Site Management - - 33.251 - - 9.961 - - 4.288 - - - - - - - - - Subtotal: Recurring Cost - - 33.251 - - 9.961 - - 4.288 - - - - - - - - - - - 33.251 - - 9.961 - - 4.288 - - - - - - - - - Maintenance Equipment - - 20.471 - - 13.132 - - - - - - - - - - - - Subtotal: Support - Support Equipment Cost - - 20.471 - - 13.132 - - - - - - - - - - - - System Engineering - - 231.544 - - 33.658 - - 6.158 - - 3.634 - - - - - 3.634 Subtotal: Support - System Engineering Cost - - 231.544 - - 33.658 - - 6.158 - - 3.634 - - - - - 3.634 Subtotal: Hardware Cost 275.522 - Package Fielding Cost Recurring Cost Non Recurring Cost Logistics Cost Recurring Cost Subtotal: Logistics Cost Support - Support Equipment Cost Support - System Engineering Cost LI 0363G85200 - Stryker Upgrade Army UNCLASSIFIED Page 6 of 7 P-1 Line #7 Volume 1 - 36 === page 67 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0363G85200 / Stryker Upgrade Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: G85200 / Stryker Upgrade MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Support - System Test and Evaluation Cost Development Test and Evaluation - - 30.627 - - - - - - - - - - - - - - - Test and Evaluation Support - - 89.532 - - 2.702 - - - - - - - - - - - - Subtotal: Support - System Test and Evaluation Cost - - 120.159 - - 2.702 - - - - - - - - - - - - - - 74.175 - - - - - - - - - - - - - - - - - 74.175 - - - - - - - - - - - - - - - 1,595 6,312.982 - - - - 28.558 - - 45.725 - - - - - 45.725 Support - Training Cost Equipment Subtotal: Support - Training Cost Gross/Weapon System Cost 3,957.982 418.097 Remarks: The FY 2027 Program Management Support (Govt) cost element decreased to $5.061 million supports all program management related expenses, including salaries, travel and supplies. The FY 2027 MCWS 30mm (Hardware Cost) cost element of $18.000 million supports the procurement of the MCWS Contact Fuze Setter hardware for three (3) of the four (4) ICVVA1-30mm brigades. The Contact Fuze Setter is a critical component that enables the use of newly developed airburst ammunition in the ICVVA1-30mm vehicles. The FY 2027 System Fielding Support - DVHA1 cost element of $19.030 million will continue to fund fielding DVHA1 vehicles, including ICVVA1-30mm vehicles to the 4th DVHA1 brigade. The fielding funding includes transportation, deprocessing, New Equipment Training (NET), fielding support, field service representative support and vehicle maintenance prior and during fielding activities. This funding will also be used for the preparation of the 5th DVHA1 brigade fielding, which is planned for FY 2028 - FY 2029. The FY 2027 System Engineering cost element of $3.634 million will support essential System Technical Support to monitor obsolescence, manage configurations, and develop/update logistics products such as operator and maintenance manuals. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 0363G85200 - Stryker Upgrade Army FY 2025 FY 2027 Base FY 2026 418.097 418.097 UNCLASSIFIED Page 7 of 7 FY 2027 OOC FY 2027 Total - - - - 28.558 45.725 - 45.725 - - - - 28.558 45.725 - 45.725 P-1 Line #7 Volume 1 - 37 === page 68 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: 1382GZ3300 / BRADLEY FIRE SUPPORT TEAM (BFIST) VEHICLE Modification of Tracked Combat Vehicles Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 601 Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 128 128 - 280 - 280 - - - - - 536 5.232 7.255 4.684 4.863 - 4.863 5.010 5.373 5.457 5.515 - 43.389 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Total - - - - - - - - - - - - 5.232 7.255 4.684 4.863 - 4.863 5.010 5.373 5.457 5.515 - 43.389 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) To FY 2031 Complete - - - - - - - - - - - - 5.232 7.255 4.684 4.863 - 4.863 5.010 5.373 5.457 5.515 - 43.389 - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - 40.875 56.680 - 17.368 - 17.368 - - - - - 80.950 Gross/Weapon System Unit Cost ($ in Thousands) Description: The Bradley Fire Support Team (BFIST) vehicle replaced the aging M981 Fire Support Vehicle used by the Fire Support Team (FIST) in the Armored Brigade Combat Teams (ABCT). The BFIST contributes to success on the battlefield by accurately locating and designating targets and then combining this information to develop and execute fire support plans. The BFIST allows fire support operations to be performed on the battlefield in vehicles with the same signature, survivability, and mobility as the other Bradley Fighting Vehicles (BFV) in the maneuver units it supports. There are 303 Bradley Fire Support Team (BFIST) vehicles fielded with three variants: M7A4 BFIST, A3 BFIST with Fire Support Sensor System (FS3), and M7 BFIST Situation Awareness (SA). This supports funding for the components, application, and engineering and logistics support of improvements designed to resolve problems identified in the field, engineering support related to production, improved safety, integrate new equipment, develop and integrate mod kits, address obsolescence issues, and bring the vehicle into compliance with transportability and recovery requirements. All three variants enable company Fire Support Teams (FIST) and company fire support officers to plan, coordinate and execute timely, accurate indirect artillery and mortar fires. The Fire Support Sensor System (FS3) on all vehicles provides automated enhanced surveillance, target acquisition, target identification, target designation, target tracking, position location, and communications functionality under armor while mounted and target acquisition and designation while dismounted. All variants are being upgraded to include Fire Observer Software (FOS) on the Mounted Family of Computer System (MFoCS), TALIN 5000 Inertial Navigation Unit (INU); and Target Accuracy upgrades to meet Category I (CAT I) Target Location Error (TLE) specifications - the highest level TLE obtainable. After upgrades are completed, all Bradley Fire Support Team (BFIST) vehicles will meet the Operational Requirements Document (ORD) objective requirements. Secondary Distribution Army Quantity Total Obligation Authority ANG Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 74 - 280 - 280 - - - - 4.194 4.684 4.863 - 4.863 5.010 5.373 5.457 5.515 54 - - - - - - - - 3.061 - - - - - - - - 128 - 280 - 280 - - - - 7.255 4.684 4.863 - 4.863 5.010 5.373 5.457 5.515 LI 1382GZ3300 - BRADLEY FIRE SUPPORT TEAM (BFIST) VEHICL... Army UNCLASSIFIED Page 1 of 4 P-1 Line #8 Volume 1 - 38 === page 69 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: 1382GZ3300 / BRADLEY FIRE SUPPORT TEAM (BFIST) VEHICLE Modification of Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 601 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 GZ3312 / M3A3 BFIST VEHICLE WITH FS3 128 / 5.232 128 / 7.255 - / 4.684 280 / 4.863 - / - 280 / 4.863 P-40 Total Gross/Weapon System Cost 128 / 5.232 128 / 7.255 - / 4.684 280 / 4.863 - / - 280 / 4.863 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 procurement dollars in the amount of $4.863 million support improvements to the Bradley Fire Support (BFIST) vehicle, resolves issues identified in the field through Field Problem Reports (FPR), improves safety, addresses obsolete components, integrates and installs modification kits, maintains software and cyber, test calibration of the Inertial Navigation Unit (INU) above the 49th parallel and updates operator/technical manuals and quick reference guides. Conducts system integration assessment on incorporating Unmanned Aerial System (UAS) capability into the BFIST mission. Current projections indicate the Bradley Fire Support Team (BFIST) will remain in the Armored Brigade Combat Team (ABCT) formation until the 2070s. The primary effort will focus on the application of field modifications to mitigate obsolescence with Fire Observer Software (FOS) on the Mounted Family of Computer System (MFoCS) and to improve Target Accuracy and survivability. Integration of the Beyond Line of Sight (BLOS) target acquisition technologies to increase combat overmatch capabilities, utilizing existing Program of Record (POR) technologies that align with the priorities of the Fires Community. Funding also supports the integration of the modernized Bradley Common Display (BCD) for all Bradley Fire Support Team (BFIST) vehicles. In accordance with section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110 - 181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 1382GZ3300 - BRADLEY FIRE SUPPORT TEAM (BFIST) VEHICL... Army UNCLASSIFIED Page 2 of 4 P-1 Line #8 Volume 1 - 39 === page 70 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1382GZ3300 / BRADLEY FIRE SUPPORT TEAM (BFIST) VEHICLE Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: GZ3312 / M3A3 BFIST VEHICLE WITH FS3 MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2027 Base FY 2027 OOC FY 2027 Total - 280 - 280 5.232 7.255 4.684 4.863 - 4.863 - - - - - - 5.232 7.255 4.684 4.863 - 4.863 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2026 128 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2025 128 - - - - - - 5.232 7.255 4.684 4.863 - 4.863 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - 40.875 56.680 - 17.368 - 17.368 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost Modification Work Order (MWO) Installation - - 1.012 - - 1.236 - - 1.568 - - 1.644 - - - - - 1.644 Obsolescence Mitigation - - 3.104 - - 6.019 - - 3.116 - - 3.219 - - - - - 3.219 - - 4.116 - - 7.255 - - 4.684 - - 4.863 - - - - - 4.863 Fire Support Station and Commander Display NRE - - 1.116 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 1.116 - - - - - - - - - - - - - - - Subtotal: Recurring Cost Non Recurring Cost Subtotal: Flyaway Cost - - 5.232 - - 7.255 - - 4.684 - - 4.863 - - - - - 4.863 Gross/Weapon System Cost 40.875 128 5.232 56.680 128 7.255 - - 4.684 17.368 280 4.863 - - - 17.368 280 4.863 Secondary Distribution Army Quantity Total Obligation Authority ANG Quantity LI 1382GZ3300 - BRADLEY FIRE SUPPORT TEAM (BFIST) VEHICL... Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total 74 - 280 - 280 4.194 4.684 4.863 - 4.863 54 - - - - UNCLASSIFIED Page 3 of 4 P-1 Line #8 Volume 1 - 40 === page 71 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 P-1 Line Item Number / Title: 1382GZ3300 / BRADLEY FIRE SUPPORT TEAM (BFIST) VEHICLE ID Code (A=Service Ready, B=Not Service Ready) : Secondary Distribution Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 1382GZ3300 - BRADLEY FIRE SUPPORT TEAM (BFIST) VEHICL... Army Item Number / Title [DODIC]: GZ3312 / M3A3 BFIST VEHICLE WITH FS3 MDAP/MAIS Code: FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total 3.061 - - - - 128 - 280 - 280 7.255 4.684 4.863 - 4.863 UNCLASSIFIED Page 4 of 4 P-1 Line #8 Volume 1 - 41 === page 72 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: 1678GZ2400 / Bradley Program (MOD) Modification of Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0203735A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 11,850.797 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 11,850.797 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 11,850.797 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 439.489 157.183 - 161.979 - 439.489 - 157.183 - - - - 157.183 161.979 - 161.979 - 439.489 - 161.979 - 161.979 - - 161.979 116.960 102.829 - - 73.174 - - - 73.174 Continuing 73.956 Continuing - 102.829 Total - 73.956 Continuing - 102.829 116.960 - 73.174 - 116.960 To FY 2031 Complete Continuing - - 73.956 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 25,107.621 Continuing Continuing Description: The Bradley Fighting Vehicle (BFV) is a fighting vehicle platform designed to transport infantry or scouts with armor protection, while providing covering fire to suppress enemy troops and armored vehicles. The primary mission area for the Bradley Fighting Vehicle is to support the mission of the Armored Brigade Combat Team (ABCT) and the ABCT mission is to fight and win engagements and battles in support of operational and strategic national objectives. The Bradley Family of Vehicles (FOV) Modification line supports 3,331 Bradley vehicles across all four variants (A4E1, A4, A3, Operation Desert Storm Situational Awareness (ODS-SA)). The funding line provides for the procurement of the A4 Mobility Engineering Change Proposals (ECPs) (A4s), fleet modifications that address changes to the vehicle configurations resulting from identified safety issues, approved Engineering Change Proposals (ECPs), integration of emerging technologies, performance degradation issues, obsolescence issues, readiness, issues identified in the field and approved by the Materiel Developer and Combat Developer for fielded Bradley Family of Vehicles (FOV), and Operational Need Statements (ONS). Additionally, this line supports the personnel, engineering, design, testing, hardware procurement, fielding, and installation in support of the aforementioned items. The Bradley Program (MOD) funding line procures upgrades to the Bradley Fighting Vehicle. The Bradley A4/A4E1 and associated Engineering Change Proposal (ECP) addresses space, weight, power, and cooling issues with an improved powertrain and electrical system enabling the Bradley to host inbound technologies from other Army Programs of Record, such as, but not limited to the Integrated Tactical Network (ITN). Additionally, the Bradley Program (MOD) procures training systems, and other upgrades, including but not limited to high priority improvements, survivability enhancements, increased cyber requirements and required modifications to achieve A4 Full Materiel Release, and obsolescence mitigation such as the Improved Bradley Acquisition Subsystem (IBAS 2.8), Bradley Processing unit, and common displays. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 1678GZ2400 - Bradley Program (MOD) Army FY 2025 FY 2027 Base FY 2026 - 439.489 439.489 157.183 157.183 FY 2027 OOC - 161.979 161.979 UNCLASSIFIED Page 1 of 18 FY 2027 Total - FY 2028 - FY 2029 - 161.979 116.960 - - 161.979 116.960 P-1 Line #9 FY 2030 - 102.829 102.829 FY 2031 - - 73.174 73.956 - - 73.174 73.956 Volume 1 - 42 === page 73 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: 1678GZ2400 / Bradley Program (MOD) Modification of Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0203735A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-3a GZ2400 / Bradley Program (MOD) (Increase Performance) P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code A Exhibits Schedule Exhibit Type Title* P-3a GZ2400 / Bradley Program (MOD) (Increase Performance) P-40 Total Gross/Weapon System Cost Subexhibits ID CD A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 11,850.797 - / 439.489 - / 157.183 - / 161.979 - / - - - / 11,850.797 - / 439.489 - / 157.183 - / 161.979 - / - - / 161.979 / 161.979 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 116.960 - / 102.829 - / 73.174 - / 73.956 Continuing Continuing - / 116.960 - / 102.829 - / 73.174 - / 73.956 Continuing Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Base procurement dollars in the amount of $161.979 million supports procurement of multiple modifications to the Bradley Family of Vehicles (FOV), to include the procurement of training devices and procurement of safety and critical obsolescence upgrades as well as obsolescence management to identify diminishing manufacturing and material sources. Current projections indicate the Bradley Fighting Vehicle will remain in the Armored Brigade Combat Team (ABCT) formation until the 2070s. The primary effort will focus on Mod 2 (BFVS High Priority Improvements) Improved Bradley Acquisition Subsystem (IBAS) 2.8 technology refresh hardware and spares procurement with system integration activities for the Bradley Processing Unit and Common Display. Mod 2 (BFVS High Priority Improvements) maintains and provides improvements to the Bradley Family of Vehicles (FoV) to resolve problems identified in the field, improves safety, addresses obsolete components, develops and integrates modification kits, full material release efforts, and provides funding to maintain A3, A4, and A4E1 facility vehicles, vehicle software and operators/technical manuals. Mod 3 (Training Equipment Devices) funding supports training device management for the Conduct of Fire Trainers (COFT), Hands on Turret Trainers (HOTT), Part Task Trainers (PTT) and Diagnostic Troubleshooting Trainers (DTT). These training devices are critical to developing and maintaining gunnery proficiency to keep the Bradley operational readiness rates high. Mod 5 (Program/Engineering Support) includes both government & contractor program management support to oversee program planning & procurement of Engineering Change Proposals (ECPs), conversion of Bradley configurations and industrial base mitigation. Mod 7 (BFVS Mobility Modification) funding supports continuation of Bradley A4/A4E1 fielding and production testing. A4/A4E1 fielding is identified and required through FY 2030. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 1678GZ2400 - Bradley Program (MOD) Army UNCLASSIFIED Page 2 of 18 P-1 Line #9 Volume 1 - 43 === page 74 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 1678GZ2400 / Bradley Program (MOD) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : A Resource Summary MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 11,850.797 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 11,850.797 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: GZ2400 / Bradley Program (MOD) 11,850.797 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 439.489 157.183 - 161.979 - 439.489 - 157.183 - - - - 157.183 161.979 - 161.979 - 439.489 - 161.979 - 161.979 - - 161.979 116.960 102.829 - - 73.174 - - - 73.174 Continuing 73.956 Continuing - 102.829 Total - 73.956 Continuing - 102.829 116.960 - 73.174 - 116.960 To FY 2031 Complete Continuing - - 73.956 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) 25,107.621 - - - - - - - - - - - - - - - - - - Continuing Continuing Description: MOD 2 (BFVS High Priority Improvements) - Provides funding for the components, application, and engineering support of improvements designed to resolve problems identified in the field, engineering support related to production, improve safety, integrate new equipment, develop and integrate mod kits, address obsolescence issues, and bring the vehicles into compliance with transportability and recovery requirements. Provides cyclical updates to vehicle software to incorporate obsolescence redesign, maintain software versions, meet cyber requirements and update integrated logistics products. MOD 3 (Training Equipment Devices) - Provides funding to support procurement and fielding of Bradley Fighting Vehicle Training Aids, Devices, Simulators and Simulations (TADSS). The Bradley training base requires a technical refresh of the following systems to address obsolescence issues: Part Task Trainers (PTT), Hands On Turret Training (HOTT), Crew Module Unit Recorder (CMUR) and the Bradley Common Software Library (BCSL). Production funding will also provide new A4 Hands on Turret Trainers and A3/A4 Parts Task Trainers to support soldier training. MOD 5 (Program/Engineering Support) - Program/Engineering Support includes both government & contractor program management support to oversee program planning & procurement of Engineering Change Proposals (ECPs), conversion of Bradley configurations and industrial base mitigation. MOD 7 (BFVS Modifications) - Provides funding to support procurement and fielding of Bradley A4/A4E1 variant vehicles. In addition to vehicles, funding supports the procurement of government furnished material and fielding. The M2A4/M7A4 Bradley regain lost capability due to added weight by upgrading the power pack and drivetrain systems. The A4 improves the electrical system to enable hosting of inbound technologies from other Army Programs of Record. Costs associated with kit installations are included in the funding for the prime hardware contracts. A4E1 is based on a A4 and integrates an active protection system and associated ECP's used to increase survivability. The Army Procurement Objective (APO) is 1,329 A4s for nine Armor Brigade Combat Teams, training, and repair cycle float vehicles. A4A4E1 Vehicle manufacturing line is expected to produce vehicles through FY 2028 and fielding through FY30. MOD 10 (Survivability Enhancements) - Provides funding to support procurement and fielding of Survivability Enhancements. It also provides funding to support the Bradley Active Protecting System (APS) to protect the Bradley against Rocket-Propelled Grenades (RPGs), Antitank Guided Munitions (ATGMs), Recoilless Rifles and Unmanned Aircraft Systems (UAS), and incorporate Counter-UAS (C-UAS) technologies. Secondary Distribution Army Quantity Total Obligation Authority Total: Quantity LI 1678GZ2400 - Bradley Program (MOD) Army FY 2025 FY 2027 Base FY 2026 - 439.489 - 157.183 - FY 2027 OOC - 161.979 - UNCLASSIFIED Page 3 of 18 FY 2027 Total - FY 2028 - FY 2029 - 161.979 116.960 - - P-1 Line #9 FY 2030 - 102.829 - FY 2031 - - 73.174 73.956 - - Volume 1 - 44 === page 75 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 P-1 Line Item Number / Title: 1678GZ2400 / Bradley Program (MOD) ID Code (A=Service Ready, B=Not Service Ready) : A Secondary Distribution Secondary Distribution Total Obligation Authority LI 1678GZ2400 - Bradley Program (MOD) Army Modification Number / Title: GZ2400 / Bradley Program (MOD) MDAP/MAIS Code: FY 2025 439.489 FY 2026 157.183 FY 2027 Base FY 2027 OOC 161.979 UNCLASSIFIED Page 4 of 18 FY 2027 Total - FY 2028 161.979 116.960 P-1 Line #9 FY 2029 102.829 FY 2030 FY 2031 73.174 73.956 Volume 1 - 45 === page 76 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 1678GZ2400 / Bradley Program (MOD) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : A MDAP/MAIS Code: Models of Systems Affected: M2 & M3 Bradley Vehicle Variants Prior Years Financial Plan Modification Number / Title: GZ2400 / Bradley Program (MOD) Modification Type: Increase Performance FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 10: Bradley Reactive Armor A Kits Recurring Kit Quantity 2,676 / 765.100 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2,676 / 765.100 2,676 / 765.100 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2,676 / 765.100 2,676 / 765.100 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2,676 / 765.100 CMED Driver Vision Upgrade 617 / 85.500 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 617 / 85.500 Reset Mods 756 / 10.500 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 756 / 10.500 INU/Talon 271 / 5.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 271 / 5.000 Heat Abatement/Cargo Hatch 2,764 / 2.870 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2,764 / 2.870 High Priority Mods - / 56.835 - / - - - / - Subtotal: Recurring Subtotal: Bradley Reactive Armor Modification Item 2 of 10: BFVS High Priority Improvements A Kits Recurring / 433.115 Urban Survivability Mods IBAS 2.8 - / 35.973 5,276 / 2,098.985 - - / 43.062 / - - - / - / - - / 56.835 - - / 50.736 / - - - / 28.796 / - - - / 22.039 / - - - / 36.716 / - - / - Continuing - Continuing / - 5,276 / 2,098.985 297 / 86.735 60 / 23.265 248 / 68.207 137 / 51.027 - / - 137 / 51.027 70 / 21.757 79 / 45.962 94 / 27.698 60 / 20.815 Continuing Continuing 9,981 / 2,722.705 60 / 59.238 248 / 111.269 137 / 107.862 - / - 137 / 107.862 70 / 72.493 79 / 74.758 94 / 49.737 60 / 57.531 Continuing Continuing 9,981 / 2,722.705 60 / 59.238 248 / 111.269 137 / 107.862 - / - 137 / 107.862 70 / 72.493 79 / 74.758 94 / 49.737 60 / 57.531 Continuing Continuing Subtotal: Recurring Subtotal: BFVS High Priority Improvements Modification Item 3 of 10: Training Equipment Devices A Kits Recurring Training Equipment - / 101.711 - / 0.035 - / 0.350 - / 5.035 - / - - / 5.035 - / 0.035 - / 0.035 - / 0.035 - / 0.035 - / - - / 107.271 Subtotal: Recurring - / 101.711 - / 0.035 - / 0.350 - / 5.035 - / - - / 5.035 - / 0.035 - / 0.035 - / 0.035 - / 0.035 - / - - / 107.271 Non-Recurring Hardware - Parts Task Trainer Subtotal: Non-Recurring Subtotal: Training Equipment Devices LI 1678GZ2400 - Bradley Program (MOD) Army - - / 88.634 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - - / 88.634 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 5.035 - / - / 0.035 - / - / 190.345 - / 0.035 - / 0.350 - UNCLASSIFIED Page 5 of 18 - / 5.035 - / 0.035 - / 0.035 P-1 Line #9 - / 0.035 - - / 88.634 / 88.634 / 195.905 Volume 1 - 46 === page 77 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 1678GZ2400 / Bradley Program (MOD) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : A MDAP/MAIS Code: Models of Systems Affected: M2 & M3 Bradley Vehicle Variants Prior Years Financial Plan Modification Number / Title: GZ2400 / Bradley Program (MOD) Modification Type: Increase Performance FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Modification Item 4 of 10: ODS Situational Awareness A Kits Recurring ODS Situational Awareness 770 / 1,199.553 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 8.850 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 12.500 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 770 / 1,220.903 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 770 / 1,220.903 770 / 1,220.903 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 770 / 1,220.903 / 11.511 - / - / 2.192 - / - IBAS Refresh - ODS-SA VEHICLE VERSION IDENTIFICATION Subtotal: Recurring Subtotal: ODS Situational Awareness - 770 / 1,199.553 - / 8.850 / 12.500 Modification Item 5 of 10: Program/Engineering Support A Kits Recurring Government PM support - / 278.102 Contractor PM Support - / 142.739 - / 420.841 - / 17.468 - / 13.421 - / 13.703 - / - - / 13.703 - / 13.919 - / 14.284 - / 14.584 - / 420.841 - / 17.468 - / 13.421 - / 13.703 - / - - / 13.703 - / 13.919 - / 14.284 - / 14.584 Subtotal: Recurring Subtotal: Program/Engineering Support - / 14.020 - - / 3.448 / 11.274 - - / 2.147 - - / 11.511 - - / 2.192 / 11.692 - - / 2.227 / 11.999 - - / 2.285 / 12.251 - - / 12.508 Continuing Continuing / 2.382 Continuing Continuing - / 14.890 Continuing Continuing - / 14.890 Continuing Continuing / 2.333 - Modification Item 6 of 10: BFVS Track and Suspension Upgrade A Kits Recurring BFVS ECP 1 Modification Subtotal: Recurring Subtotal: BFVS Track and Suspension Upgrade 3,344 / 608.117 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3,344 / 608.117 3,344 / 608.117 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3,344 / 608.117 3,344 / 608.117 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3,344 / 608.117 Modification Item 7 of 10: BFVS Mobility Modification A Kits Recurring BFVS A4 Modification Subtotal: Recurring Subtotal: BFVS Mobility Modification 985 / 5,638.440 - / 362.748 - / 32.143 - / 35.379 - / - - / 35.379 - / 30.513 - / 13.752 - / 8.818 - / 1.500 - / - 985 / 6,123.293 985 / 5,638.440 - / 362.748 - / 32.143 - / 35.379 - / - - / 35.379 - / 30.513 - / 13.752 - / 8.818 - / 1.500 - / - 985 / 6,123.293 985 / 5,638.440 - / 362.748 - / 32.143 - / 35.379 - / - - / 35.379 - / 30.513 - / 13.752 - / 8.818 - / 1.500 - / - 985 / 6,123.293 Modification Item 8 of 10: Conversion to M2 A Kits LI 1678GZ2400 - Bradley Program (MOD) Army UNCLASSIFIED Page 6 of 18 P-1 Line #9 Volume 1 - 47 === page 78 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 1678GZ2400 / Bradley Program (MOD) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : A MDAP/MAIS Code: Models of Systems Affected: M2 & M3 Bradley Vehicle Variants Prior Years Financial Plan Modification Number / Title: GZ2400 / Bradley Program (MOD) Modification Type: Increase Performance FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Recurring Conversion M3-M2 195 / 132.245 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 5.942 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Subtotal: Recurring 195 / 138.187 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 195 / 138.187 Subtotal: Conversion to M2 195 / 138.187 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 195 / 138.187 Transmission 266 / 87.834 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 266 / 87.834 Subtotal: Recurring 266 / 87.834 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 266 / 87.834 266 / 87.834 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 266 / 87.834 Underbelly Interium Solution (UBIS) 600 / 17.371 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 600 / 17.371 Iron Fist Lightweight Decouple (IFLD) - / 40.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - 600 / 57.371 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 600 / 57.371 - / - - / - - / - / - - / - - / - - / - - / - - / - Fielding - 195 / 132.245 - / 5.942 Modification Item 9 of 10: Braking Safety/ Transmission Industrial Base A Kits Recurring Subtotal: Braking Safety/Transmission Industrial Base Modification Item 10 of 10: Survivability Enhancements B Kits Recurring Subtotal: Recurring / 40.000 Subtotal: Survivability Enhancements 600 / 57.371 - / - - Subtotal: Procurement, All Modification Items 18,817 / 11,849.843 60 / 439.489 248 / 157.183 137 / 161.979 - / - 137 / 161.979 70 / 116.960 79 / 102.829 94 / 73.174 60 / 73.956 9,981 / 0.954 60 / - 248 / - 137 / - - / - 137 / - 70 / - 79 / - 94 / - 60 / - - / - 10,729 / 0.954 Continuing 600 / 57.371 Continuing Installation Modification Item 2 of 10: BFVS High Priority Improvements Modification Item 6 of 10: BFVS Track and Suspension Upgrade 2,943 / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2,943 / - Modification Item 7 of 10: BFVS Mobility Modification 985 / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 985 / - Modification Item 8 of 10: Conversion to M2 195 / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 195 / - Modification Item 10 of 10: Survivability Enhancements 600 / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 600 / - 137 / - - / - 137 / - 60 / - - / - 15,452 / 0.954 Subtotal: Installation 14,704 / 0.954 60 / - 248 / - 70 / - 79 / - 94 / - Total LI 1678GZ2400 - Bradley Program (MOD) Army UNCLASSIFIED Page 7 of 18 P-1 Line #9 Volume 1 - 48 === page 79 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 1678GZ2400 / Bradley Program (MOD) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : A MDAP/MAIS Code: Models of Systems Affected: M2 & M3 Bradley Vehicle Variants Prior Years Financial Plan Total Cost (Procurement + Support + Installation) LI 1678GZ2400 - Bradley Program (MOD) Army Modification Number / Title: GZ2400 / Bradley Program (MOD) Modification Type: Increase Performance FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) 11,850.797 439.489 157.183 161.979 - UNCLASSIFIED Page 8 of 18 161.979 116.960 102.829 P-1 Line #9 73.174 73.956 Continuing Continuing Volume 1 - 49 === page 80 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 P-1 Line Item Number / Title: 1678GZ2400 / Bradley Program (MOD) ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: GZ2400 / Bradley Program (MOD) MDAP/MAIS Code: Modification Item 1 of 10: Bradley Reactive Armor Manufacturer Information Manufacturer Name: General Dynamics Armament & Technical Products (GDATP) Manufacturer Location: Burlington, VT Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Contractor LI 1678GZ2400 - Bradley Program (MOD) Army Installation Quantity: 0 UNCLASSIFIED Page 9 of 18 P-1 Line #9 Volume 1 - 50 === page 81 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 1678GZ2400 / Bradley Program (MOD) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: GZ2400 / Bradley Program (MOD) MDAP/MAIS Code: Modification Item 2 of 10: BFVS High Priority Improvements Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 5 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 Contract Dates Feb 2025 Feb 2026 Feb 2027 FY 2028 FY 2029 FY 2030 FY 2031 Delivery Dates Installation Information Method of Implementation: Contractor Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 60 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - 60 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - 248 / 0.000 - / - - / - - / - - / - - / - 137 / 0.000 70 / 0.000 - / - - / - - / - - / - 70 / 0.000 79 / 0.000 - / - - / - - / - 79 / 0.000 94 / 0.000 - / - - / - 94 / 0.000 60 / 0.000 - / - 60 / 0.000 / - - / - - 60 / 0.000 - / - 10,729 / 0.954 Prior Years 9,981 / 0.954 FY 2025 - / - FY 2026 - / - - / - FY 2027 - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 9,981 / 0.954 248 / 0.000 137 / 0.000 60 / 0.000 248 / 0.000 137 / 0.000 137 / 0.000 137 / 0.000 70 / 0.000 79 / 0.000 - 94 / 0.000 9,981 / 0.954 / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC In 9,738 25 - 28 71 39 28 78 32 88 50 - - 28 71 39 - 28 71 39 - 28 71 39 - 28 71 39 - - 10,729 Out 9,678 25 - 28 71 39 28 78 32 88 50 - - 28 71 39 - 28 71 39 - 28 71 39 - 28 71 39 - 6010,729 LI 1678GZ2400 - Bradley Program (MOD) Army UNCLASSIFIED Page 10 of 18 P-1 Line #9 Tot Volume 1 - 51 === page 82 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 P-1 Line Item Number / Title: 1678GZ2400 / Bradley Program (MOD) ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: GZ2400 / Bradley Program (MOD) MDAP/MAIS Code: Modification Item 3 of 10: Training Equipment Devices Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 9 Dates FY 2025 Production Leadtime (in Months): 12 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Contractor LI 1678GZ2400 - Bradley Program (MOD) Army Installation Quantity: 0 UNCLASSIFIED Page 11 of 18 P-1 Line #9 Volume 1 - 52 === page 83 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 P-1 Line Item Number / Title: 1678GZ2400 / Bradley Program (MOD) ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: GZ2400 / Bradley Program (MOD) MDAP/MAIS Code: Modification Item 4 of 10: ODS Situational Awareness Manufacturer Information Manufacturer Name: BAE Manufacturer Location: YORK, PA Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Contractor LI 1678GZ2400 - Bradley Program (MOD) Army Installation Quantity: 0 UNCLASSIFIED Page 12 of 18 P-1 Line #9 Volume 1 - 53 === page 84 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 P-1 Line Item Number / Title: 1678GZ2400 / Bradley Program (MOD) ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: GZ2400 / Bradley Program (MOD) MDAP/MAIS Code: Modification Item 5 of 10: Program/Engineering Support Manufacturer Information Manufacturer Name: N/A Manufacturer Location: WARREN, MI Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Various LI 1678GZ2400 - Bradley Program (MOD) Army Installation Quantity: 0 UNCLASSIFIED Page 13 of 18 P-1 Line #9 Volume 1 - 54 === page 85 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 1678GZ2400 / Bradley Program (MOD) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: GZ2400 / Bradley Program (MOD) MDAP/MAIS Code: Modification Item 6 of 10: BFVS Track and Suspension Upgrade Manufacturer Information Manufacturer Name: American Rheinmetall Manufacturer Location: Various Administrative Leadtime (in Months): Dates Production Leadtime (in Months): 13 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Contractor Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 2,943 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2,943 / 0.000 FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2,943 / 0.000 Total 2,943 / 0.000 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 3,344 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3,344 Out 3,344 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3,344 LI 1678GZ2400 - Bradley Program (MOD) Army UNCLASSIFIED Page 14 of 18 P-1 Line #9 Volume 1 - 55 === page 86 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 1678GZ2400 / Bradley Program (MOD) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: GZ2400 / Bradley Program (MOD) MDAP/MAIS Code: Modification Item 7 of 10: BFVS Mobility Modification Manufacturer Information Manufacturer Name: BAE Manufacturer Location: York, PA Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 12 Dates FY 2025 Contract Dates Dec 2024 Delivery Dates Jun 2028 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Contractor Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 985 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 985 / 0.000 985 / 0.000 985 / 0.000 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 753 - - - 44 - 54 54 54 26 - - - - - - - - - - - - - - - - - - - - 985 Out 542 39 - 10 36 31 31 30 18 44 54 54 48 24 19 - - - - - - - - - - - - - - 985 5 LI 1678GZ2400 - Bradley Program (MOD) Army UNCLASSIFIED Page 15 of 18 P-1 Line #9 Volume 1 - 56 === page 87 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 1678GZ2400 / Bradley Program (MOD) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: GZ2400 / Bradley Program (MOD) MDAP/MAIS Code: Modification Item 8 of 10: Conversion to M2 Manufacturer Information Manufacturer Name: BAE Manufacturer Location: YORK, PA Administrative Leadtime (in Months): Dates Production Leadtime (in Months): FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Contractor Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 195 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 195 / 0.000 195 / 0.000 195 / 0.000 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 195 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 195 Out 195 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 195 LI 1678GZ2400 - Bradley Program (MOD) Army UNCLASSIFIED Page 16 of 18 P-1 Line #9 Volume 1 - 57 === page 88 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 P-1 Line Item Number / Title: 1678GZ2400 / Bradley Program (MOD) ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: GZ2400 / Bradley Program (MOD) MDAP/MAIS Code: Modification Item 9 of 10: Braking Safety/Transmission Industrial Base Manufacturer Information Manufacturer Name: RENK Manufacturer Location: MUSKEGON, MI Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Contractor LI 1678GZ2400 - Bradley Program (MOD) Army Installation Quantity: 0 UNCLASSIFIED Page 17 of 18 P-1 Line #9 Volume 1 - 58 === page 89 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 1678GZ2400 / Bradley Program (MOD) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: GZ2400 / Bradley Program (MOD) MDAP/MAIS Code: Modification Item 10 of 10: Survivability Enhancements Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 10 Dates Production Leadtime (in Months): 6 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Unit (Unit incurs installation cost) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 600 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 600 / 0.000 600 / 0.000 600 / 0.000 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 600 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 600 Out 600 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 600 LI 1678GZ2400 - Bradley Program (MOD) Army UNCLASSIFIED Page 18 of 18 P-1 Line #9 Volume 1 - 59 === page 90 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: 2072GA0400 / M109 FOV Modifications Modification of Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0604854A Other Related Program Elements: 0604854A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 2,236.676 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 42.574 82.537 74.070 - 74.070 83.898 79.164 25.650 - - Total 2,624.569 16.321 - - - - - - - - - - 16.321 2,220.355 42.574 82.537 74.070 - 74.070 83.898 79.164 25.650 - - 2,608.248 16.321 - - - - - - - - - - 16.321 2,236.676 42.574 82.537 74.070 - 74.070 83.898 79.164 25.650 - - 2,624.569 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: This funding line is a key enabler of the Army Modernization Priorities in support of the Long-Range Precision Fires. The M109 Family of Vehicles (FOV) Modifications line consists of the M109A6 Self-Propelled Howitzer (SPH) and the M992A2 Field Artillery Ammunition Supply Vehicle (FAASV), the M109A7 Self-Propelled Howitzer (SPH) and M992A3 Carrier, Ammunition, Tracked (CAT). The funding profile provides for the engineering design, testing, hardware procurement, and application in support of improvements to resolve problems identified in the field and approved by the Materiel Developer and Combat Developer for fielded M109 Family of Vehicles (FOV). These improvements address maintaining operational readiness rates, improving vehicle safety and operation, and integrating new equipment. Funding also supports aspects of program management necessary to support the fielded fleet of M109 Family of Vehicles (FOV) in 16 Active Duty Army and National Guard Battalions organic to Armored Brigade Combat Teams (ABCT); 10 Battalions organic to Army Fires Brigades; 3 Rotational unit sets; 4 Army Prepositioned Stock sets; 2 Institutional Training Sites, 2 Combat Training Centers, and other facility vehicles for System Technical Support (STS) work for development and qualification of proposed engineering changes and technical improvements. Engineering Change Proposals (ECPs) will be applied through a modification work order and procured for the M109 Family of Vehicles. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 2072GA0400 - M109 FOV Modifications Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 42.574 82.537 74.070 - 74.070 83.898 79.164 25.650 - - - - - - - - - - 42.574 82.537 74.070 - 74.070 83.898 79.164 25.650 - UNCLASSIFIED Page 1 of 16 P-1 Line #10 Volume 1 - 60 === page 91 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: 2072GA0400 / M109 FOV Modifications Modification of Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0604854A Other Related Program Elements: 0604854A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-3a GA0400 / M109 FOV Modifications (Increase Performance) P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code B Exhibits Schedule Exhibit Type Title* P-3a GA0400 / M109 FOV Modifications (Increase Performance) P-40 Total Gross/Weapon System Cost Subexhibits ID CD B MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 2,236.676 - / 42.574 - / 82.537 - / 74.070 - / - - - / 2,236.676 - / 42.574 - / 82.537 - / 74.070 - / - - / 74.070 / 74.070 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 83.898 - / 79.164 - / 25.650 - / - - / - - / 2,624.569 - / 83.898 - / 79.164 - / 25.650 - / - - / - - / 2,624.569 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 base procurement funding in the amount of $74.070 million supports M109 Family of Vehicles (FOV) modifications, program office requirements and Systems Technical Support (STS) contractor support for M109 Family of Vehicles (FOV). Program management is for the oversight of Other Governmental Agencies (OGAs) that provides material support to the system and the fielded units to ensure configuration management; provides the analysis and root cause of safety and non-safety related field failures; provides M109 FOV Depot Overhaul support as needed; provides planning and execution for obsolescence of parts, sub-systems and systems; develops and coordinates shrinking supply base mitigation strategies with item managers. The program office works to lower operation and sustainment costs and improve unit readiness by analyzing data and determining solutions to solve the field's problem sets. The program office manages the Systems Technical Support/Sustainment Systems Technical Support (STS/SSTS) contract that provides direct support to the program and the field. Contractor provides the direct engineering support required to integrate modification kits; provides the logistical support to provision, source, and supports the field with material solutions/changes. Contractor also updates/corrects all system technical data, provisioning data, technical manuals, and Interactive-Electronic Technical Manuals (IETMs). Contractor provides emergency field support to the Government as required for essential mission accomplishment. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 2072GA0400 - M109 FOV Modifications Army UNCLASSIFIED Page 2 of 16 P-1 Line #10 Volume 1 - 61 === page 92 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2072GA0400 / M109 FOV Modifications Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : B Resource Summary MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: GA0400 / M109 FOV Modifications 2,236.676 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 42.574 82.537 74.070 - 74.070 83.898 79.164 25.650 - - Total 2,624.569 16.321 - - - - - - - - - - 16.321 2,220.355 42.574 82.537 74.070 - 74.070 83.898 79.164 25.650 - - 2,608.248 16.321 - - - - - - - - - - 16.321 2,236.676 42.574 82.537 74.070 - 74.070 83.898 79.164 25.650 - - 2,624.569 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: M109 Family of Vehicles (FOV) Program Office [MOD 1]: Government System Engineering and Program Management support for the M109 Family of Vehicles (FOV) program. Interior Blast Mitigation Retrofit Hardware/Fielding (M109A7) [MOD 3]: Procures and installs improved floor mat and ammo restraints to prevent those objects from becoming secondary projectiles in an underbody blast event. Chief of Section protection (Increment I) Hardware and Fielding [MOD 4]: Ballistic riser with transparent armor, is intended to improve the situational awareness and personnel survivability when firing the crewserved weapon of the current systems in fielded Fires Battalions. These fixes also address shortcomings in training identified in Initial Operational Testing related to "combat only" configurations. Ventilation System Dust Cover [MOD 5]: Procure/retrofit hardware to integrate pre-filtration design that reduces frequency of ventilation system clogging. Self-Propelled Howitzer (SPH) Crew Compartment Automated Fire Extinguishing System (AFES) Retrofit Hardware & Fielding [MOD 6]: Procure/retrofit hardware to expand to full crew compartment coverage from personnel heater coverage. Fielding Hardware [MOD 7]: United States Government (USG) Program Management (PM) and fielding support funding is required in order to execute Modification Work Orders (MWOs) as part of the Life Cycle Management of the M109 Family of Vehicles (FOV) fleet; ensure the fleet is supported - equipment readiness. Driver's Seatbelt Redesign Hardware [MOD 8]: Procure to correct issues associated with the Driver's Seatbelt and related components that comprise the seatbelt restraint system. Driver's Hatch Redesign Hardware [MOD 9]: Procure hardware that will address M109A7/M992A3 driver's hatch improvements to eradicate hatch leak issues. This will simplify the design configuration to reduce the number of potential leak paths, address installation issues at the production facility and improve in-field installation. Secondary Distribution Army Quantity Total Obligation Authority Total: Quantity LI 2072GA0400 - M109 FOV Modifications Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 42.574 82.537 74.070 - 74.070 83.898 79.164 25.650 - - - - - - - - - - UNCLASSIFIED Page 3 of 16 P-1 Line #10 Volume 1 - 62 === page 93 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 P-1 Line Item Number / Title: 2072GA0400 / M109 FOV Modifications ID Code (A=Service Ready, B=Not Service Ready) : B Secondary Distribution Secondary Distribution Total Obligation Authority LI 2072GA0400 - M109 FOV Modifications Army Modification Number / Title: GA0400 / M109 FOV Modifications MDAP/MAIS Code: FY 2025 42.574 FY 2026 82.537 FY 2027 Base FY 2027 OOC 74.070 UNCLASSIFIED Page 4 of 16 FY 2027 Total - FY 2028 74.070 83.898 P-1 Line #10 FY 2029 79.164 FY 2030 FY 2031 25.650 - Volume 1 - 63 === page 94 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2072GA0400 / M109 FOV Modifications Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : B MDAP/MAIS Code: Models of Systems Affected: M109 Howitzer and M992 FAASV/CAT Vehicles Prior Years Financial Plan Modification Number / Title: GA0400 / M109 FOV Modifications Modification Type: Increase Performance FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 9: M109 Family of Vehicles Program Office A Kits Recurring Program Management (PM) Support Subtotal: Recurring Subtotal: M109 Family of Vehicles Program Office - / 19.945 - / 0.030 - / - - / 7.308 - / - - / 7.308 - / 7.874 - / 7.860 - / 2.338 - / - - / - - / 45.355 - / 19.945 - / 0.030 - / - - / 7.308 - / - - / 7.308 - / 7.874 - / 7.860 - / 2.338 - / - - / - - / 45.355 - / 19.945 - / 0.030 - / - - / 7.308 - / - - / 7.308 - / 7.874 - / 7.860 - / 2.338 - / - - / - - / 45.355 Modification Item 2 of 9: Prior Years Closed Modifications A Kits Recurring Prior Closed Modifications Subtotal: Recurring Subtotal: Prior Years Closed Modifications - / 2,194.605 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 2,194.605 - / 2,194.605 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 2,194.605 - / 2,194.605 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 2,194.605 Modification Item 3 of 9: Interior Blast Mitigation Retrofit Hardware/Fielding (M109A7) A Kits Recurring Hardware Subtotal: Recurring Subtotal: Interior Blast Mitigation Retrofit Hardware/ Fielding (M109A7) 1,147 / 11.959 954 / 3.727 - / - - / - - / - - / - - / - - / - - / - - / - - / - 2,101 / 15.686 1,147 / 11.959 954 / 3.727 - / - - / - - / - - / - - / - - / - - / - - / - - / - 2,101 / 15.686 1,147 / 11.959 954 / 3.727 - / - - / - - / - - / - - / - - / - - / - - / - - / - 2,101 / 15.686 - / - 24 / 9.296 140 / 50.285 141 / 32.324 - / - 141 / 32.324 299 / 69.939 275 / 65.620 - / - - / - - / - 879 / 227.464 - / - 24 / 9.296 140 / 50.285 141 / 32.324 - / - 141 / 32.324 299 / 69.939 275 / 65.620 - / - - / - - / - 879 / 227.464 - / - 24 / 9.296 140 / 50.285 141 / 32.324 - / - 141 / 32.324 299 / 69.939 275 / 65.620 - / - - / - - / - 879 / 227.464 Modification Item 4 of 9: Chief of Section Protection (Inc. I) Hardware Fielding A Kits Recurring Chief of Section Protection Subtotal: Recurring Subtotal: Chief of Section Protection (Inc. I) Hardware Fielding LI 2072GA0400 - M109 FOV Modifications Army UNCLASSIFIED Page 5 of 16 P-1 Line #10 Volume 1 - 64 === page 95 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2072GA0400 / M109 FOV Modifications Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : B MDAP/MAIS Code: Models of Systems Affected: M109 Howitzer and M992 FAASV/CAT Vehicles Prior Years Financial Plan Modification Number / Title: GA0400 / M109 FOV Modifications Modification Type: Increase Performance FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Modification Item 5 of 9: Ventilation System Dust Cover B Kits Recurring Hardware Subtotal: Recurring Subtotal: Ventilation System Dust Cover - / - 316 / 5.400 - / - - / - - / - - / - - / - - / - - / - - / - - / - 316 / 5.400 - / - 316 / 5.400 - / - - / - - / - - / - - / - - / - - / - - / - - / - 316 / 5.400 - / - 316 / 5.400 - / - - / - - / - - / - - / - - / - - / - - / - - / - 316 / 5.400 Modification Item 6 of 9: Self-Propelled Howitzer Crew Compartment Automated Fire Extinguishing System Hardware and Fielding A Kits Recurring SPH Crew Compartment AFES Retrofit HW Subtotal: Recurring Subtotal: Self-Propelled Howitzer Crew Compartment Automated Fire Extinguishing System Hardware and Fielding 200 / 8.254 - / - 411 / 21.064 - / - - / - - / - - / - - / - - / - - / - - / - 611 / 29.318 200 / 8.254 - / - 411 / 21.064 - / - - / - - / - - / - - / - - / - - / - - / - 611 / 29.318 200 / 8.254 - / - 411 / 21.064 - / - - / - - / - - / - - / - - / - - / - - / - 611 / 29.318 Modification Item 7 of 9: Fielding Hardware A Kits Recurring - / 1.913 - / 19.728 - / 1.907 - / 8.033 - / - - / 8.033 - / 6.085 - / 5.684 - / 23.312 - / - - / - - / 66.662 Subtotal: Recurring Fielding HW - / 1.913 - / 19.728 - / 1.907 - / 8.033 - / - - / 8.033 - / 6.085 - / 5.684 - / 23.312 - / - - / - - / 66.662 Subtotal: Fielding Hardware - / 1.913 - / 19.728 - / 1.907 - / 8.033 - / - - / 8.033 - / 6.085 - / 5.684 - / 23.312 - / - - / - - / 66.662 Modification Item 8 of 9: Driver's Seatbelt Redesign Hardware A Kits Recurring Hardware Subtotal: Recurring Subtotal: Driver's Seatbelt Redesign Hardware - / - 954 / 4.393 - / - - / - - / - - / - - / - - / - - / - - / - - / - 954 / 4.393 - / - 954 / 4.393 - / - - / - - / - - / - - / - - / - - / - - / - - / - 954 / 4.393 - / - 954 / 4.393 - / - - / - - / - - / - - / - - / - - / - - / - - / - 954 / 4.393 Modification Item 9 of 9: Driver's Hatch Redesign Hardware LI 2072GA0400 - M109 FOV Modifications Army UNCLASSIFIED Page 6 of 16 P-1 Line #10 Volume 1 - 65 === page 96 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2072GA0400 / M109 FOV Modifications Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : B MDAP/MAIS Code: Models of Systems Affected: M109 Howitzer and M992 FAASV/CAT Vehicles Prior Years Financial Plan Modification Number / Title: GA0400 / M109 FOV Modifications Modification Type: Increase Performance FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) A Kits Recurring Hardware Subtotal: Recurring Subtotal: Driver's Hatch Redesign Hardware Subtotal: Procurement, All Modification Items - / - - / - 796 / 9.281 724 / 26.405 - / - 724 / 26.405 - / - - / - - / - - / - - / - 1,520 / 35.686 - / - - / - 796 / 9.281 724 / 26.405 - / - 724 / 26.405 - / - - / - - / - - / - - / - 1,520 / 35.686 - / - - / - 796 / 9.281 724 / 26.405 - / - 724 / 26.405 - / - - / - - / - - / - - / - 1,520 / 35.686 1,347 / 2,236.676 2,248 / 42.574 1,347 / 82.537 865 / 74.070 - / - 865 / 74.070 / 25.650 - / - - / - 6,381 / 2,624.569 / - - / - - - / - - / - - / - 2,101 / - 299 / 83.898 275 / 79.164 - Installation Modification Item 3 of 9: Interior Blast Mitigation Retrofit Hardware/Fielding (M109A7) 1,147 / - 954 / - - Modification Item 4 of 9: Chief of Section Protection (Inc. I) Hardware Fielding - / - 24 / - 140 / - 141 / - - / - 141 / - 299 / - 275 / - 35 / - - / - - / - 914 / - Modification Item 5 of 9: Ventilation System Dust Cover - / - 316 / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 316 / - Modification Item 6 of 9: Self-Propelled Howitzer Crew Compartment Automated Fire Extinguishing System Hardware and Fielding 200 / - - 411 / - - / - - / - - / - - / - - / - - / - - / - - / - 611 / - Modification Item 8 of 9: Driver's Seatbelt Redesign Hardware - / - 954 / - - - / - - / - - / - - / - - / - - / - - / - - / - 954 / - Modification Item 9 of 9: Driver's Hatch Redesign Hardware - / - - / - 796 / - 724 / - - / - 724 / - - / - - / - - / - - / - - / - 1,520 / - 2,248 / - 1,347 / - 865 / - - / - 865 / - 299 / - 35 / - - / - - / - 6,416 / - Subtotal: Installation 1,347 / - / - / - / - - / - - / - - / - 275 / - Total Total Cost (Procurement + Support + Installation) LI 2072GA0400 - M109 FOV Modifications Army 2,236.676 42.574 82.537 74.070 - UNCLASSIFIED Page 7 of 16 74.070 83.898 79.164 P-1 Line #10 25.650 - - 2,624.569 Volume 1 - 66 === page 97 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 P-1 Line Item Number / Title: 2072GA0400 / M109 FOV Modifications ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: GA0400 / M109 FOV Modifications MDAP/MAIS Code: Modification Item 1 of 9: M109 Family of Vehicles Program Office Manufacturer Information Manufacturer Name: Multiple Manufacturer Location: Warren, MI Administrative Leadtime (in Months): Production Leadtime (in Months): Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Oct 2024 Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2029 Delivery Dates Oct 2024 Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2029 FY 2031 Installation Information Method of Implementation (Organic): N/A LI 2072GA0400 - M109 FOV Modifications Army Installation Quantity: 0 UNCLASSIFIED Page 8 of 16 P-1 Line #10 Volume 1 - 67 === page 98 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 P-1 Line Item Number / Title: 2072GA0400 / M109 FOV Modifications ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: GA0400 / M109 FOV Modifications MDAP/MAIS Code: Modification Item 2 of 9: Prior Years Closed Modifications Manufacturer Information Manufacturer Name: x Manufacturer Location: x Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): x LI 2072GA0400 - M109 FOV Modifications Army Installation Quantity: 0 UNCLASSIFIED Page 9 of 16 P-1 Line #10 Volume 1 - 68 === page 99 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2072GA0400 / M109 FOV Modifications Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: GA0400 / M109 FOV Modifications MDAP/MAIS Code: Modification Item 3 of 9: Interior Blast Mitigation Retrofit Hardware/Fielding (M109A7) Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 6 Dates FY 2025 FY 2026 Contract Dates Dec 2024 Dec 2025 Delivery Dates Jun 2025 Jun 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: . Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1,147 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - 954 / 0.000 Prior Years 1,147 / 0.000 FY 2025 - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2,101 / 0.000 Total / - / - 954 / 0.000 1,147 / 0.000 954 / 0.000 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 1,147 954 - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2,101 Out 1,147 - - 238 238 239 239 - - - - - - - - - - - - - - - - - - - - - - - 2,101 LI 2072GA0400 - M109 FOV Modifications Army UNCLASSIFIED Page 10 of 16 P-1 Line #10 Volume 1 - 69 === page 100 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2072GA0400 / M109 FOV Modifications Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: GA0400 / M109 FOV Modifications MDAP/MAIS Code: Modification Item 4 of 9: Chief of Section Protection (Inc. I) Hardware Fielding Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 9 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Jun 2025 Jun 2026 Jun 2027 Jun 2028 Jun 2029 Delivery Dates Jun 2026 Jun 2027 Jun 2028 Jun 2029 Jun 2030 FY 2030 FY 2031 Installation Information Method of Implementation: . Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 24 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - 24 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - 140 / 0.000 - / - - / - - / - - / - - / - - / - 141 / 0.000 - / - - / - - / - - / - 299 / 0.000 - / - - / - - / - 275 / 0.000 35 / 0.000 - / - - / - 35 / 0.000 Prior Years 0 / 0.000 FY 2025 - / - FY 2026 - / - - / - FY 2027 - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - 35 / 0.000 - / - - / - 140 / 0.000 141 / 0.000 24 / 0.000 140 / 0.000 141 / 0.000 141 / 0.000 299 / 0.000 141 / 0.000 275 / 0.000 299 / 0.000 275 / 0.000 - / - 914 / 0.000 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - 24 - - - 140 - - - 141 - - - 299 - - - 275 - - - - - - - - - - 879 Out - - - - - - - 6 35 35 35 35 35 35 35 36 74 74 74 75 69 69 69 70 - - - 879 LI 2072GA0400 - M109 FOV Modifications Army 6 6 6 UNCLASSIFIED Page 11 of 16 P-1 Line #10 Volume 1 - 70 === page 101 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2072GA0400 / M109 FOV Modifications Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: GA0400 / M109 FOV Modifications MDAP/MAIS Code: Modification Item 5 of 9: Ventilation System Dust Cover Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 8 Production Leadtime (in Months): 3 Dates FY 2025 Contract Dates Jun 2025 Delivery Dates Sep 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: . Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Prior Years 0 / 0.000 FY 2025 - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / - / - 316 / 0.000 316 / 0.000 - / - 316 / 0.000 316 / 0.000 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - 316 - - - - - - - - - - - - - - - - - - - - - - - - - - 316 Out - - - - 79 79 79 79 - - - - - - - - - - - - - - - - - - - - - - 316 LI 2072GA0400 - M109 FOV Modifications Army UNCLASSIFIED Page 12 of 16 P-1 Line #10 Volume 1 - 71 === page 102 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2072GA0400 / M109 FOV Modifications Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: GA0400 / M109 FOV Modifications MDAP/MAIS Code: Modification Item 6 of 9: Self-Propelled Howitzer Crew Compartment Automated Fire Extinguishing System Hardware and Fielding Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): Dates Production Leadtime (in Months): 6 FY 2025 FY 2026 Contract Dates Oct 2025 Delivery Dates Mar 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: . Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 200 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 200 / 0.000 411 / 0.000 411 / 0.000 200 / 0.000 - / - 411 / 0.000 611 / 0.000 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 220 - - - - 411 - - - - - - - - - - - - - - - - - - - - - - - - 631 Out 120 50 50 - - - 103 103 103 102 - - - - - - - - - - - - - - - - - - - - 631 LI 2072GA0400 - M109 FOV Modifications Army UNCLASSIFIED Page 13 of 16 P-1 Line #10 Volume 1 - 72 === page 103 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 P-1 Line Item Number / Title: 2072GA0400 / M109 FOV Modifications ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: GA0400 / M109 FOV Modifications MDAP/MAIS Code: Modification Item 7 of 9: Fielding Hardware Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): Production Leadtime (in Months): Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Oct 2024 Oct 2025 Oct 2026 Oct 2027 Oct 2028 Oct 2029 Delivery Dates Oct 2024 Oct 2025 Oct 2026 Oct 2027 Oct 2028 Oct 2029 FY 2031 Installation Information Method of Implementation (Organic): . LI 2072GA0400 - M109 FOV Modifications Army Installation Quantity: 0 UNCLASSIFIED Page 14 of 16 P-1 Line #10 Volume 1 - 73 === page 104 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2072GA0400 / M109 FOV Modifications Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: GA0400 / M109 FOV Modifications MDAP/MAIS Code: Modification Item 8 of 9: Driver's Seatbelt Redesign Hardware Manufacturer Information Manufacturer Name: TBD Manufacturer Location: Tbd Administrative Leadtime (in Months): 11 Production Leadtime (in Months): 9 Dates FY 2025 Contract Dates Aug 2025 Delivery Dates Apr 2026 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: . Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Prior Years 0 / 0.000 FY 2025 - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / - / - 954 / 0.000 954 / 0.000 - / - 954 / 0.000 954 / 0.000 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - 954 - - - - - - - - - - - - - - - - - - - - - - - - - 954 Out - - - - - - - 238 238 239 239 - - - - - - - - - - - - - - - - - - - 954 LI 2072GA0400 - M109 FOV Modifications Army UNCLASSIFIED Page 15 of 16 P-1 Line #10 Volume 1 - 74 === page 105 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2072GA0400 / M109 FOV Modifications Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: GA0400 / M109 FOV Modifications MDAP/MAIS Code: Modification Item 9 of 9: Driver's Hatch Redesign Hardware Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): 1 Dates Production Leadtime (in Months): 9 FY 2025 FY 2026 FY 2027 Contract Dates Oct 2025 Jan 2027 FY 2028 Delivery Dates Sep 2026 Sep 2027 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: . Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 796 / 0.000 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - 724 / 0.000 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - - / - 1,520 / 0.000 796 / 0.000 724 / 0.000 796 / 0.000 724 / 0.000 724 / 0.000 724 / 0.000 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - 796 - - - - 724 - - - - - - - - - - - - - - - - - - - 1,520 Out - - - - - - - - 199 199 199 199 181 181 181 181 - - - - - - - - - - - - - - 1,520 LI 2072GA0400 - M109 FOV Modifications Army UNCLASSIFIED Page 16 of 16 P-1 Line #10 Volume 1 - 75 === page 106 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: 2073GZ0410 / Paladin Integrated Management (PIM) Modification of Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0203743A Line Item MDAP/MAIS Code: 466 Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 452 39 40 - - - - - - - 127 658 6,022.074 760.361 715.000 84.193 - 84.193 - - - - 2,147.343 9,728.971 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 6,022.074 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 6,022.074 - - 760.361 715.000 - - 760.361 715.000 To FY 2031 Complete - - - - - - - 84.193 - 84.193 - - - - - - - - - - - 84.193 - 84.193 - - - - Total - - 2,147.343 9,728.971 - - 2,147.343 9,728.971 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 13,323.173 19,496.436 17,875.000 - 16,908.213 14,785.670 Description: This funding line is a key enabler of the Army Modernization Priorities in support of Long-Range Precision Fires. Paladin Integrated Management (PIM) is an Acquisition Category (ACAT) level IC Major Defense Acquisition Program (MDAP). The program replaces the current fleet of M109 Family of Vehicles (FOV) which consists of the M109A6 Self-Propelled Howitzer (SPH) and the M992A2 Field Artillery Ammunition Supply Vehicle (FAASV). Paladin Integrated Management (PIM) is an Army Modernization Program that addresses a critical capability gap created by the Non-Line of Sight Cannon termination in June of 2009, as well as obsolescence and size/weight and power (SWaP) issues in the M109 Family of Vehicles (FOV) current fleet. The Paladin Integrated Management (PIM) system integrates the current Bradley Fighting Vehicle suspension and drivetrain items, Future Combat Systems (FCS) developed Electric Gun Drive systems and current fleet armament systems into a new chassis that provides better force protection, survivability and mobility over the antecedent vehicles (M109A6 and M992A2). Paladin Integrated Management (PIM) is a two-vehicle system: The M109A7 Self-Propelled Howitzer (SPH) has all characteristics listed above. The Carrier Ammunition Tracked (CAT) utilizes all these same components and traits less those that relate directly to the cannon system. The Paladin Integrated Management (PIM) system replaces the current M109 Family of Vehicles (FOV) on a one for one basis, in the cannon fires battalions in the Armored Brigade Combat Team Formations and in the Echelons Above Brigade (EAB). The Paladin Integrated Management (PIM) system will continue fielding until the AAO has been fulfilled. The overall intent is to increase Soldier force protection, vehicle survivability, provide an appropriate amount of Space, Weight, and Power (SWaP) capacity to add future capabilities, reduce life cycle costs and extend the life of the M109 FOV. Net funding decrease from FY 2026 to FY 2027 is due to FY 2026 being the final year of production contract awards and FY 2027 funding will support vehicle fieldings as the program transitions towards sustainment. Secondary Distribution Army Quantity Total Obligation Authority ANG FY 2027 Base FY 2026 24 22 551.217 393.250 15 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - 84.193 - 84.193 - - - - 18 - - - - - - - 209.144 321.750 - - - - - - - 39 40 - - - - - - - Quantity Total Obligation Authority Total: FY 2025 Quantity LI 2073GZ0410 - Paladin Integrated Management (PIM) Army UNCLASSIFIED Page 1 of 7 P-1 Line #11 Volume 1 - 76 === page 107 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: 2073GZ0410 / Paladin Integrated Management (PIM) Modification of Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0203743A Line Item MDAP/MAIS Code: 466 Secondary Distribution Secondary Distribution Total Obligation Authority FY 2025 760.361 LI 2073GZ0410 - Paladin Integrated Management (PIM) Army FY 2026 715.000 FY 2027 Base FY 2027 OOC 84.193 UNCLASSIFIED Page 2 of 7 FY 2027 Total - FY 2028 84.193 P-1 Line #11 FY 2029 - FY 2030 - FY 2031 - - Volume 1 - 77 === page 108 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: 2073GZ0410 / Paladin Integrated Management (PIM) Modification of Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0203743A Line Item MDAP/MAIS Code: 466 Exhibits Schedule Exhibit Type Title* P-5 GZ0410 / Paladin Integrated Management (PIM) P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 452 / 6,022.074 39 / 760.361 40 / 715.000 - / 84.193 - / - - / 84.193 452 / 6,022.074 39 / 760.361 40 / 715.000 - / 84.193 - / - - / 84.193 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Base Procurement dollars in the amount of $84.193 million supports all Government Program Management activities required to provide oversight on contractor production operations including Quality Process Management, Program Management Reviews (weekly, monthly, and quarterly), Government Furnished Property and Material Management, and engineering activities resulting from waivers/deviations/ problem resolution and supplier/vendor industrial base. Funding also supports the Systems Technical Support (STS) contract providing contractor support to the program office and vehicles as well as, soldiers in the field. The STS contract includes the direct engineering support required to integrate hardware modification kits, provides the logistical support to provision, source, and supports the field with material solutions/changes, and updates/corrects all system technical data, provisioning data, technical manuals, and Interactive-Electronic Technical Manuals (IETMs). Efforts on this contract provide emergency field support to the Government as required for essential mission accomplishment. The unit cost represents a cost per vehicle set (1 Self Propelled Howitzer (SPH) and 1 Carrier Ammunition Tracked (CAT)). This funding line is a key enabler of the Army Modernization Priorities in support of Long-Range Precision Fires. Army Acquisition Objective (AAO): 689 sets The correct Cost to Complete quantity is 158 and will be updated prior to the next budget submission. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 2073GZ0410 - Paladin Integrated Management (PIM) Army UNCLASSIFIED Page 3 of 7 P-1 Line #11 Volume 1 - 78 === page 109 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2073GZ0410 / Paladin Integrated Management (PIM) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: GZ0410 / Paladin Integrated Management (PIM) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2026 452 39 40 6,022.074 760.361 715.000 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) - 6,022.074 Plus CY Advance Procurement ($ in Millions) - - 84.193 - 84.193 715.000 - 6,022.074 FY 2027 OOC - - 760.361 - Total Obligation Authority ($ in Millions) FY 2027 Base - - - 84.193 - 84.193 - 760.361 715.000 FY 2027 Total - - - 84.193 - 84.193 - - - - - - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 13,323.173 - 19,496.436 17,875.000 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost SYS ENG/ PROG MGMT (CONTRACTOR) - - 117.272 - - - - - 20.325 - - 16.973 - - - - - 16.973 SYSTEM TECHNICAL SUPPORT - - 467.154 - - 52.952 - - 43.241 - - 18.341 - - - - - 18.341 SYS TEST & EVALUATION (CONTRACTOR) - - 32.282 - - 1.440 - - 2.750 - - - - - - - - - SYS ENG/ PROG MGMT (GOVERNMENT) - - 217.896 - - 31.638 - - 28.389 - - 8.400 - - - - - 8.400 SYS TEST & EVALUATION (GOVERNMENT) - - 22.264 - - 3.409 - - 3.129 - - - - - - - - - TRANSPORTATION - - 14.205 - - - - - 3.389 - - - - - - - - - Subtotal: Recurring Cost - - 871.073 - - 89.439 - - 101.223 - - 43.714 - - - - - 43.714 PRODUCTION FACILITIZATION - - 31.474 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 31.474 - - - - - - - - - - - - - - - - - 902.547 - - 89.439 - - - - 43.714 - - - - - 43.714 Non Recurring Cost Subtotal: Flyaway Cost 101.223 Hardware Cost LI 2073GZ0410 - Paladin Integrated Management (PIM) Army UNCLASSIFIED Page 4 of 7 P-1 Line #11 Volume 1 - 79 === page 110 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2073GZ0410 / Paladin Integrated Management (PIM) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: GZ0410 / Paladin Integrated Management (PIM) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Unit Cost 450 3,998.660 14,738.821 Qty (Each) ($ M) ($ K) FY 2026 Total Cost Unit Cost 39 574.814 11,897.300 Qty (Each) ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Recurring Cost (†) MANUFACTURING 8,885.911 40 475.892 - - - - - - - - - - - 49.563 - - - - - - - - - - - - - - - - - - - - - - - - - 26.904 - - - - - - - - - - 8.000 - - 34.959 - - - - - - - - - - 662.298 - - 587.318 - - - - - - - - - - - 662.298 - - 587.318 - - - - - - - - - 4.305 - - - - - 1.406 - - 1.386 - - - - - 1.386 - 4.305 - - - - - 1.406 - - 1.386 - - - - - 1.386 - - 24.693 - - - - - 0.166 - - - - - - - - - - - 24.693 - - - - - 0.166 - - - - - - - - - - - 85.416 - - 6.426 - - 16.095 - - 28.121 - - - - - 28.121 - - 85.416 - - 6.426 - - 16.095 - - 28.121 - - - - - 28.121 GOVERNMENT FURNISHED EQUIPMENT (GFE) - - 600.567 - - 79.484 THEATRE PROVIDED EQUIPMENT - - 38.438 - - RECURRING PRODUCTION OTHER - - 127.134 - - ENGINEERING CHANGE ORDERS - - 125.430 - Subtotal: Recurring Cost - - 4,890.229 - - - 4,890.229 - - - Technical Publications Subtotal: Support - Data Cost Subtotal: Hardware Cost Support - Contractor Logistics Support (CLS) Cost Oversight Subtotal: Support Contractor Logistics Support (CLS) Cost Support - Data Cost Support - Initial Spares and Repair Parts Cost Initial Spares and Repair Parts Subtotal: Support - Initial Spares and Repair Parts Cost Support - Initial Support Equipment (ISE) Cost Support and Handling Equipment - - 16.960 - - - - - 2.520 - - 4.072 - - - - - 4.072 Subtotal: Support - Initial Support Equipment (ISE) Cost - - 16.960 - - - - - 2.520 - - 4.072 - - - - - 4.072 - 29.259 - - - - - 3.754 - - - - - - - - - Support - New Equipment Training (NET) Cost Equipment - LI 2073GZ0410 - Paladin Integrated Management (PIM) Army UNCLASSIFIED Page 5 of 7 P-1 Line #11 Volume 1 - 80 === page 111 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2073GZ0410 / Paladin Integrated Management (PIM) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: GZ0410 / Paladin Integrated Management (PIM) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) Subtotal: Support - New Equipment Training (NET) Cost FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - 29.259 - - - - - 3.754 - - - - - - - - - Maintenance Equipment - - 45.868 - - 2.198 - - 2.518 - - 6.900 - - - - - 6.900 Subtotal: Support - Support Equipment Cost - - 45.868 - - 2.198 - - 2.518 - - 6.900 - - - - - 6.900 - - 22.797 - - - - - - - - - - - - - - - - - 22.797 - - - - - - - - - - - - - - - 452 6,022.074 - - 84.193 - - - - - 84.193 Support - Support Equipment Cost Support - Training Cost Equipment Subtotal: Support - Training Cost Gross/Weapon System Cost 13,323.173 19,496.436 39 760.361 17,875.000 40 715.000 Remarks: FY 2026 manufacturing is estimated based on contractor proposals. Actual costs may change upon completion of negotiations. The FY 2027 decrease in System Technical Support costs is due to scope being reduced to address all engineering and logistics requirements associated with the end of vehicle production and fielding. The FY 2027 decrease in Government System Engineering/Program Management reflects a transition in Government support as the program prepares to transition to sustainment following the final vehicle production contract. Secondary Distribution Army Quantity Total Obligation Authority ANG Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 24 22 551.217 393.250 FY 2027 OOC FY 2027 Total - - - 84.193 - 84.193 15 18 - - - 209.144 321.750 - - - 39 40 - - - 760.361 715.000 84.193 - 84.193 indicates the presence of a P-5a LI 2073GZ0410 - Paladin Integrated Management (PIM) Army UNCLASSIFIED Page 6 of 7 P-1 Line #11 Volume 1 - 81 === page 112 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: GZ0410 / Paladin Integrated Management (PIM) FY Contractor and Location Method/Type or Funding Vehicle MANUFACTURING 2025 BAE / York SS / FPIF TACOM, Warren, MI Apr 2025 Aug 2027 39 14,738.821 N MANUFACTURING 2026 BAE / York SS / FPIF TACOM, Warren, MI Apr 2026 Aug 2028 40 11,897.300 N Cost Elements O O C P-1 Line Item Number / Title: 2073GZ0410 / Paladin Integrated Management (PIM) Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date Remarks: FY 2026 is estimated based on contractor proposals. Actual costs may change upon completion of negotiations. LI 2073GZ0410 - Paladin Integrated Management (PIM) Army UNCLASSIFIED Page 7 of 7 P-1 Line #11 Volume 1 - 82 === page 113 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: 3700GA0570 / IMPROVED RECOVERY VEHICLE (M88 HERCULES) Modification of Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 539 Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 14 6 10 - 10 14 14 14 3,155.401 240.657 80.770 106.036 - 106.036 142.557 143.731 143.620 3,155.401 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2026 953 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2025 3,155.401 - - 240.657 - 80.770 - 106.036 - 240.657 - - 80.770 106.036 - 106.036 - - 106.036 - - 142.557 - 14 Continuing 133.077 - 143.731 133.077 - 143.731 133.077 Continuing - Continuing - 143.620 Total Continuing Continuing - 143.620 - 142.557 To FY 2031 Complete Continuing - - Continuing Continuing - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 3,311.019 17,189.786 13,461.667 10,603.600 - 10,603.600 10,182.643 10,266.500 10,258.571 9,505.500 Continuing Continuing Description: The M88 Heavy Equipment Recovery Combat Utility Lift and Evacuation System (HERCULES) Family of Vehicles (FoV) provides maintenance support, towing, winching, and hoisting operations to support battlefield recovery operations and evacuation of heavy tanks and other tracked combat vehicles. The M88A2 is the only vehicle that can provide vehicle recovery of the 70-Ton Abrams Main Battle Tank on the battlefield. The Combat Recovery System (CRS) program supports the critical recapitalization and Service Life Extension Program (SLEP) of M88A2 vehicles. This program enables the Army to gain improved operational readiness and modernizes existing vehicle systems through technology insertion and adding useful life by returning the vehicles to a like-new condition (zero hours and zero miles). SLEP allows the Army to maintain critical M88A2 vehicle capabilities by extending the useful life of the aged fleet. Additionally, provides program personnel, engineering, Engineering Change Proposals (ECPs) design, testing, hardware procurement, training and training materials, and modification work order (MWO) of improvements to resolve safety, reliability, operational readiness, obsolescence and vehicle recovery operation issues identified in the field and approved by the Materiel Developer and Combat Developer. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 14 6 10 - 10 14 14 14 14 240.657 80.770 106.036 - 106.036 142.557 143.731 143.620 133.077 14 6 10 - 10 14 14 14 14 240.657 80.770 106.036 - 106.036 142.557 143.731 143.620 133.077 LI 3700GA0570 - IMPROVED RECOVERY VEHICLE (M88 HERCULES) Army UNCLASSIFIED Page 1 of 9 P-1 Line #12 Volume 1 - 83 === page 114 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: 3700GA0570 / IMPROVED RECOVERY VEHICLE (M88 HERCULES) Modification of Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 539 Exhibits Schedule Exhibit Type Title* P-5 GA0570 / IMPROVED RECOVERY VEHICLE (M88 HERCULES) P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 953 / 3,155.401 14 / 240.657 6 / 80.770 10 / 106.036 - / - 10 / 106.036 953 / 3,155.401 14 / 240.657 6 / 80.770 10 / 106.036 - / - 10 / 106.036 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Base Procurement dollars in the amount of $106.036 million supports the critical recapitalization and Service Life Extension Program (SLEP) for M88A2 vehicles, to include the purchase of government furnished equipment and material. M88A2 SLEP enables the Army to gain improved operational readiness, modernizes existing vehicle systems and resets useful life clock by rebuilding vehicles to like-new condition (zero hours and zero miles). The funding supports the M88 FoV fleet modifications, addressing improvements to operational readiness rates, vehicle safety, reliability, survivability and operation, integration of new equipment, technologies and potential Counter-Unmanned Aircraft Systems (C-UAS) solutions for emerging threats. Accordingly, FY 2027 procurement covers government engineering, logistics, testing, program management efforts supporting SLEP and other operational readiness related improvements, user requested system enhancements, and obsolescence management to enable uninterrupted SLEP efforts. In accordance with section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110 - 181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 3700GA0570 - IMPROVED RECOVERY VEHICLE (M88 HERCULES) Army UNCLASSIFIED Page 2 of 9 P-1 Line #12 Volume 1 - 84 === page 115 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3700GA0570 / IMPROVED RECOVERY VEHICLE (M88 HERCULES) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: GA0570 / IMPROVED RECOVERY VEHICLE (M88 HERCULES) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2026 FY 2027 Total 6 10 - 10 3,155.401 240.657 80.770 106.036 - 106.036 - - 3,155.401 Plus CY Advance Procurement ($ in Millions) - 240.657 - Total Obligation Authority ($ in Millions) FY 2027 OOC 14 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2027 Base 953 - 3,155.401 - 80.770 - 240.657 - 106.036 - 80.770 - - 106.036 - 106.036 - - 106.036 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 3,311.019 - 17,189.786 - 13,461.667 - 10,603.600 - - 10,603.600 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) Qty (Each) FY 2025 FY 2026 Total Cost Unit Cost 2,236.493 7,857.929 14 110.011 5,565.800 10 55.658 ($ M) ($ K) Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost M88 Vehicle Manufacturing - 2,341.877 (†) Contractor M88 Vehicle Manufacturing - Government SLEP (Service Life 955 - - 3,290.833 - - 12 39.490 - 3,312.143 - - - - - 14 46.370 - - - - 3,312.143 - - 14 46.370 - - Vehicle Manufacturing - GFE - - 109.419 - - 6.686 - - 2.792 - - 4.217 - - - - - 4.217 Hull Reclamation - - 90.135 - - 7.102 - - 2.518 - - 4.215 - - - - - 4.215 Fielding (TPF & NET) - - 99.655 - - 8.079 - - 4.230 - - 4.951 - - - - - 4.951 Transportation - - 17.148 - - 0.253 - - 0.100 - - 0.323 - - - - - 0.323 Test (Production Verification Testing) - - 26.828 - - 1.045 - - - - - 2.500 - - - - - 2.500 System Technical Support - - 414.795 - - 28.107 - - 10.970 - - 14.243 - - - - - 14.243 Program Management - - 124.162 - - 16.553 - - 10.740 - - 12.109 - - - - - 12.109 Modifications - - 36.766 - - 7.163 - - 9.930 - - 17.108 - - - - - 17.108 - - 3,155.401 - - 240.657 - - 80.770 - - 106.036 - - - - - 106.036 - - 3,155.401 - - 240.657 - - 80.770 - - 106.036 - - - - - 106.036 (†) Extension Program) Subtotal: Recurring Cost Subtotal: Flyaway Cost LI 3700GA0570 - IMPROVED RECOVERY VEHICLE (M88 HERCULES) Army UNCLASSIFIED Page 3 of 9 P-1 Line #12 Volume 1 - 85 === page 116 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3700GA0570 / IMPROVED RECOVERY VEHICLE (M88 HERCULES) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: GA0570 / IMPROVED RECOVERY VEHICLE (M88 HERCULES) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Gross/Weapon System Cost Unit Cost ($ K) 3,311.019 Qty (Each) 953 FY 2025 Total Cost Unit Cost 3,155.401 17,189.786 ($ M) ($ K) Qty (Each) FY 2026 Total Cost Unit Cost 240.657 13,461.667 ($ M) 14 ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) 6 80.770 Unit Cost ($ K) Qty (Each) 10,603.600 FY 2027 OOC Total Cost ($ M) 10 Unit Cost 106.036 ($ K) - FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) - ($ K) - 10,603.600 Total Cost Qty (Each) ($ M) 10 106.036 Remarks: FY 2027 Vehicle Manufacturing - Government SLEP (Service Life Extension Program) cost element increases to $46.370 million due to the decision to proceed forward with the M88A2 SLEP. M88 vehicle manufacturing contractor cost varies from FY 2025 - FY 2027 due to the Army's July 2025 decision not to procure a new M88A3 variant and instead proceed with the M88A2 Service Life Extension Program. FY 2027 Government Furnished Material (GFM) cost element increases to $4.217 million as the number of GFM items needed for the M88A2 SLEP is greater than the previous year. FY 2027 Hull Reclamation cost element increases to $4.215 million to support the M88A2 SLEP increased production. FY 2027 Fielding (TPF & NET) remains consistent at $4.951 million. This cost element supports M88A2 reduced planned fielding efforts in FY 2027. Efforts include deprocessing, fielding team support, conducting field modifications, training material refinement, and procuring initial spare parts to support the Army's fielding plans. FY 2027 Transportation increase slightly to $0.323 million to support increased production and fielding requirements. FY 2027 Test (Production Verification Testing) cost element increases to $2.500 million. This cost element supports annual follow-on production testing requirement to ensure vehicles received from the production line are meeting quality standards. FY 2027 System Technical Support cost element increases to $14.243 million. The increase in vehicle production and subsequent fielding necessitates a corresponding increase in technical support to manage potential issues, software maintenance, and general logistics for a much larger fleet. FY 2027 Program Management cost element slightly increases to $12.109 million as the program has transitioned to the Full Rate Production and Deployment phase. FY 2027 Modifications cost element increases to $17.108 million. This cost element supports the Engine upgrade, Op Mod hardware kits, technical manuals, technical publications and documentation updates. Pending production contract negotiations, FY 2025 planned quantity is a combined 24 M88A2 vehicles for new production and SLEP. FY 2026 planned quantity is 12 M88A2 vehicles, via SLEP. FY 2027 planned quantity is 14 M88A2 vehicles, via SLEP. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total 14 6 10 - 10 240.657 80.770 106.036 - 106.036 14 6 10 - 10 240.657 80.770 106.036 - 106.036 indicates the presence of a P-5a LI 3700GA0570 - IMPROVED RECOVERY VEHICLE (M88 HERCULES) Army UNCLASSIFIED Page 4 of 9 P-1 Line #12 Volume 1 - 86 === page 117 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 Cost Elements M88 Vehicle Manufacturing Contractor M88 Vehicle Manufacturing Government SLEP (Service Life (†) Extension Program) M88 Vehicle Manufacturing Government SLEP (Service Life (†) Extension Program) M88 Vehicle Manufacturing Government SLEP (Service Life (†) Extension Program) (†) O O C P-1 Line Item Number / Title: 3700GA0570 / IMPROVED RECOVERY VEHICLE (M88 HERCULES) Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: GA0570 / IMPROVED RECOVERY VEHICLE (M88 HERCULES) FY Contractor and Location Method/Type or Funding Vehicle Specs Date Unit Cost Avail Revision Now? Available ($ K) 2025 BAE Systems / Anniston, AL C / FFP Detroit Arsenal, MI Dec 2025 Jan 2028 14 7,857.929 Y Nov 2025 2025 BAE Systems / Anniston, AL C / FFP Detroit Aresnal, MI Dec 2025 Aug 2028 10 5,565.800 Y Nov 2025 2026 Anniston Army Depot / Anniston, AL Various Detroit Arsenal, MI Jun 2026 Oct 2028 12 3,290.833 Y Apr 2026 2027 Anniston Army Depot / Anniston, AL Various Detroit Arsenal, MI Mar 2027 Apr 2029 14 3,312.143 Y Aug 2026 Qty (Each) RFP Issue Date indicates the presence of a P-21 Remarks: M88 vehicle manufacturing contractor cost varies from FY 2025 - FY 2027 due to the Army's July 2025 decision not to procure a new M88A3 variant and instead procure M88A2s. The FY 2027 vehicle cost slightly changes due to the decision to proceed forward with initial SLEP effort through BAE Systems and follow on efforts in coordination with Anniston Army Depot to perform the work. Pending production contract negotiations, FY 2025 planned quantity is a combined 24 M88A2 vehicles for new production and SLEP. FY 2026 planned quantity is 12 M88A2 vehicles, via SLEP. FY 2027 planned quantity is 14 M88A2 vehicles, via SLEP. LI 3700GA0570 - IMPROVED RECOVERY VEHICLE (M88 HERCULES) Army UNCLASSIFIED Page 5 of 9 P-1 Line #12 Volume 1 - 87 === page 118 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3700GA0570 / IMPROVED RECOVERY VEHICLE (M88 HERCULES) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: GA0570 / IMPROVED RECOVERY VEHICLE (M88 HERCULES) Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P M88 Vehicle Manufacturing - Government SLEP (Service Life Extension Program) 2 2025 ARMY 10 0 10 1 2026 ARMY 12 0 12 1 2027 ARMY 14 0 14 A - O C T N O V D E C - J A N - F E B - M A R - A P R LI 3700GA0570 - IMPROVED RECOVERY VEHICLE (M88 HERCULES) Army - M A Y - - - - - - - - - - - - - - - - 10 A - - - - - - - - - - - - - - - - 12 A - - - - - - - 14 J U N J U L A U G UNCLASSIFIED Page 6 of 9 S E P O C T N O V D E C J A N F E B P-1 Line #12 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 88 === page 119 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3700GA0570 / IMPROVED RECOVERY VEHICLE (M88 HERCULES) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: GA0570 / IMPROVED RECOVERY VEHICLE (M88 HERCULES) Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P M88 Vehicle Manufacturing - Government SLEP (Service Life Extension Program) 2 2025 ARMY 10 0 10 - - - - - - - - - - 1 2026 ARMY 12 0 12 - - - - - - - - - - - - 1 2027 ARMY 14 0 14 - - - - - - - - - - - - O C T N O V D E C J A N F E B M A R A P R LI 3700GA0570 - IMPROVED RECOVERY VEHICLE (M88 HERCULES) Army M A Y J U N J U L 1 A U G UNCLASSIFIED Page 7 of 9 2 S E P 2 2 2 1 2 2 2 2 O C T N O V D E C 0 2 J A N 2 F E B P-1 Line #12 0 M A R 2 A P R 2 M A Y 2 J U N 2 J U L 2 A U G 2 S E P Volume 1 - 89 2 === page 120 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3700GA0570 / IMPROVED RECOVERY VEHICLE (M88 HERCULES) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: GA0570 / IMPROVED RECOVERY VEHICLE (M88 HERCULES) Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E M88 Vehicle Manufacturing - Government SLEP (Service Life Extension Program) 2 2025 ARMY 10 10 0 1 2026 ARMY 12 12 0 1 2027 ARMY 14 12 2 0 0 2 O C T 0 N O V D E C J A N F E B M A R A P R LI 3700GA0570 - IMPROVED RECOVERY VEHICLE (M88 HERCULES) Army M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 9 S E P O C T N O V D E C J A N F E B P-1 Line #12 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 90 === page 121 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3700GA0570 / IMPROVED RECOVERY VEHICLE (M88 HERCULES) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: GA0570 / IMPROVED RECOVERY VEHICLE (M88 HERCULES) Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Anniston Army Depot Anniston, AL 2 3 5 2 6 24 30 2 6 24 30 2 BAE Systems - Anniston, AL 2 3 5 12 3 24 27 8 4 24 28 Remarks: FY 2027 planned quantity is 14 M88A2 SLEP vehicles, pending production negotiations. Pending production contract negotiations, FY 2025 planned quantity is a combined 24 M88A2 vehicles for new production and SLEP. FY 2026 planned quantity is 12 M88A2 vehicles, via SLEP. FY 2027 planned quantity is 14 M88A2 vehicles, via SLEP. Actual quantities to be adjusted once negotiations are complete. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 3700GA0570 - IMPROVED RECOVERY VEHICLE (M88 HERCULES) Army UNCLASSIFIED Page 9 of 9 P-1 Line #12 Volume 1 - 91 === page 122 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: 5225GZ3001 / Joint Assault Bridge Modification of Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0604804A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 147 28 20 18 - 18 - - - - - 213 854.447 174.779 129.555 163.354 - 163.354 94.996 44.472 40.334 - 1,667.359 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 854.447 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 854.447 - - 174.779 - 129.555 - - 174.779 - 163.354 - 129.555 - - 163.354 - 163.354 - - 163.354 165.422 165.422 165.422 To FY 2031 Complete - - - - 94.996 44.472 40.334 - - - - - 94.996 44.472 40.334 - Total 1,667.359 1,667.359 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 5,812.565 6,242.107 6,477.750 9,075.222 - 9,075.222 7,827.977 Description: The M1110 Joint Assault Bridge (JAB) replaces the existing M104 Wolverine and M48A5/M60 chassis-based Armored Vehicle Launched Bridge (AVLB) to meet current maneuver force survivability, suitability and supportability requirements and provide the only gap crossing capabilities to the armored forces during combat operations. The JAB is an M1A1 Abrams chassis-based engineer vehicle with a M1A2 Abrams heavy suspension that launches and retrieves the 18.3-meter Heavy Assault Scissor Bridge (HASB), which is currently rated at Military Load Classification (MLC) 115 Tons. The JAB system is employed with Army Armored Brigade Combat Teams (ABCT) in the Brigade Engineer Battalions (BEB), Engineer Mobility Augmentation Companies (MAC), and Combat Engineer Companies - Armored (CEC-A). The production / acquisition strategy includes a partnership with Anniston Army Depot (ANAD) for the production of the Abrams Chassis and HASB; the ANAD effort includes the upgrade of the HASB to MLC-115. The JAB prime contractor will produce and integrate the Bridge Launch Mechanism (BLM) Add on Armor (AoA) with Mission Ready Tablet (MRT). There are 120 JAB systems in Army inventory which must be retrofitted, based on Modification Work Orders (MWO), with BLM AoA and the MRT in order to pure fleet the JAB. The JAB program will employ modifications to correct safety deficiencies, increase mission capabilities, extend the useful life, improve supportability, upgrade existing technology, increase efficiency, address obsolescence, improve readiness, and to meet new legal and regulatory requirements. The JAB Common Driver Trainer (Simulators) will be employed to support training efforts for the JAB program. The JAB program completed Initial Operational Test (IOT) in November 2020, received Type Classification-Standard (TC-STD) and Full Rate Production (FRP) approval in March 2021, and achieved Full Materiel Release on April 2023. Army Acquisition Objective (AAO): 256 Army Procurement Objective (APO): 213 Secondary Distribution Army Quantity Total Obligation Authority ANG Total: Secondary Distribution FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 28 11 15 - 15 174.779 72.474 116.741 - 116.741 FY 2029 - 165.422 FY 2030 FY 2031 - - - 94.996 44.472 40.334 Quantity - 9 3 - 3 - - - - Total Obligation Authority - 57.081 46.613 - 46.613 - - - - Quantity 28 20 18 - 18 - - - - 174.779 129.555 163.354 - 163.354 94.996 44.472 40.334 Total Obligation Authority LI 5225GZ3001 - Joint Assault Bridge Army UNCLASSIFIED Page 1 of 9 165.422 P-1 Line #13 Volume 1 - 92 === page 123 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: 5225GZ3001 / Joint Assault Bridge Modification of Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0604804A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 GZ3001 / Joint Assault Bridge P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 147 / 854.447 28 / 174.779 20 / 129.555 18 / 163.354 - / - 18 / 163.354 147 / 854.447 28 / 174.779 20 / 129.555 18 / 163.354 - / - 18 / 163.354 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Base funding in the amount of $163.354 million procures 18 Joint Assault Bridges and the retrofit of 30 JABs with Bridge Launch Mechanism (BLM) Add on Armor (AoA), to include the Mission Ready Tablet (MRT). The FY 2026 to FY 2027 total funding request increase is attributable to the JAB requiring BLM AoA with MRT to mitigate a Live Fire Test and Evaluation safety concern. Thirty BLMs AoA with MRT will be funded at $1.426 million per unit in FY 2027. Overall production costs of the JAB remain consistent, adjusted for inflation. Funding supports the organic industrial base with work to be performed at Anniston Army Depot (ANAD), including purchase of long lead material and subsequent production effort. Unit cost increase to the Organic ANAD portion reflects the increase to Tiger Engine costs. The Joint Assault Bridge (JAB) fills a critical need in the Army Armored Brigade Combat Teams (ABCT) / Brigade Engineer Battalions (BEB), Engineer Mobility Augmentation Companies (MAC), Combat Engineer Companies - Armored (CEC-A) formations, and provides a system that offers the Combatant Commander improved readiness and enhanced survivability, mobility, and sustainability over the legacy M48A5/M60 Armored Vehicle Launched Bridge (AVLB). Without the JAB, these armored forces will not have the ability to cross gaps during combat operations, severely limiting movement and maneuver and degrading our advantage. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 5225GZ3001 - Joint Assault Bridge Army UNCLASSIFIED Page 2 of 9 P-1 Line #13 Volume 1 - 93 === page 124 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 5225GZ3001 / Joint Assault Bridge Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: GZ3001 / Joint Assault Bridge MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) FY 2025 FY 2026 18 - 18 854.447 174.779 129.555 163.354 - 163.354 - - 174.779 - Total Obligation Authority ($ in Millions) FY 2027 Total 20 854.447 Plus CY Advance Procurement ($ in Millions) FY 2027 OOC 28 - Net Procurement (P-1) ($ in Millions) FY 2027 Base 147 - 854.447 - 129.555 - 174.779 - 163.354 - 129.555 - - 163.354 - 163.354 - - 163.354 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 5,812.565 - 6,242.107 - 6,477.750 - 9,075.222 - - 9,075.222 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost Hardware - Low Rate Initial Production (LRIP) Hardware - Full Rate Production (FRP) (†) Government Furnished Materials (GFM) Anniston Army Depot (ANAD) Rolling Chassis Bridge Upgrades 1,416.646 79 111.915 1,464.485 68 99.585 2,819.605 147 502.463 - - - 2,003.036 28 56.085 414.482 3,045.071 28 518.107 - - - 2,203.000 20 44.060 85.262 3,276.450 20 524.100 - - - - - - 2,371.444 18 42.686 - - - 65.529 3,333.056 18 59.995 - - 545.000 - - - 2,371.444 18 42.686 - 3,333.056 18 59.995 545.000 18 9.810 147 73.862 28 14.507 20 10.482 18 9.810 - - - Engineering Changes - - 52.283 - - 4.756 - - - - - - - - - - - - System Engineering/ Program Management - - 47.714 - - 6.733 - - 6.634 - - 5.095 - - - - - 5.095 Support Equipment/ Associated Support Items Of Equipment (ASIOE) - - 10.076 - - 4.456 - - 1.350 - - 1.500 - - - - - 1.500 Fielding - - 11.617 - - 2.230 - - 1.000 - - 1.000 - - - - - 1.000 First Destination Transportation - FDT - - 4.005 - - 0.750 - - 0.500 - - 0.500 - - - - - 0.500 JAB Bridge Launch Mechanism (BLM) Add on Armor (AoA) and - - - - - - - - - 30 24.000 - - - 30 24.000 LI 5225GZ3001 - Joint Assault Bridge Army UNCLASSIFIED Page 3 of 9 800.000 P-1 Line #13 800.000 Volume 1 - 94 === page 125 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 5225GZ3001 / Joint Assault Bridge Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: GZ3001 / Joint Assault Bridge MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) Qty ($ K) FY 2027 Total Total Cost (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Mission Ready Tablet (MRT) (†) JAB Bridge Launch Mechanism (BLM) Add on Armor (AoA) Installation - - Subtotal: Recurring Cost - - Logistics Products - Simulator - Common Driver Trainer (CDT) Update - - - 825.539 - - - 6.132 - - - - 13.755 - Interim Contractor Logistics Support (ICLS) - - 4.206 Reprogrammed dollars - - Subtotal: Non Recurring Cost - - - - 30 18.768 - - - - - - - 163.354 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4.815 - - - - - - - - - 28.908 - - - 854.447 - - 174.779 - - - - - - - - 129.555 - - 163.354 147 854.447 28 174.779 20 129.555 18 163.354 174.779 129.555 625.600 625.600 30 18.768 - - 163.354 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 163.354 - - - 18 163.354 Non Recurring Cost Subtotal: Flyaway Cost Gross/Weapon System Cost 5,812.565 6,242.107 6,477.750 9,075.222 9,075.222 - Remarks: The FY 2026 to FY 2027 per unit cost increase is attributable to the Joint Assault Bridge (JAB) requiring a Bridge Launch Mechanism (BLM) Add on Armor (AoA) along with a Mission Ready Tablet (MRT) to mitigate a Live Fire Test and Evaluation safety concern. Thirty BLMs with MRT will be funded at $1.426 million per unit in FY 2027(incorporates cost of hardware and installation). Overall production costs of the JAB remain consistent, adjusted for inflation. Army Procurement Objective (APO) decreased to 213. Current contract ends May 2026. A follow-on contract will be awarded prior to end of year FY 2026. Secondary Distribution Army Quantity Total Obligation Authority ANG Total: Secondary Distribution FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total 28 11 15 - 15 174.779 72.474 116.741 - 116.741 Quantity - 9 3 - 3 Total Obligation Authority - 57.081 46.613 - 46.613 Quantity Total Obligation Authority LI 5225GZ3001 - Joint Assault Bridge Army 28 20 18 - 18 174.779 129.555 163.354 - 163.354 UNCLASSIFIED Page 4 of 9 P-1 Line #13 Volume 1 - 95 === page 126 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 P-1 Line Item Number / Title: 5225GZ3001 / Joint Assault Bridge ID Code (A=Service Ready, B=Not Service Ready) : A (†) Item Number / Title [DODIC]: GZ3001 / Joint Assault Bridge MDAP/MAIS Code: indicates the presence of a P-5a LI 5225GZ3001 - Joint Assault Bridge Army UNCLASSIFIED Page 5 of 9 P-1 Line #13 Volume 1 - 96 === page 127 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 O O C Cost Elements Hardware - Full Rate Production (FRP) (†) Hardware - Full Rate Production (FRP) (†) Hardware - Full Rate Production (FRP) (†) JAB Bridge Launch Mechanism (BLM) Add on Armor (AoA) and Mission Ready Tablet (MRT) (†) (†) P-1 Line Item Number / Title: 5225GZ3001 / Joint Assault Bridge Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: GZ3001 / Joint Assault Bridge Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty FY Contractor and Location 2025 DRS Leonardo Sustainment Systems, Inc. / Saint Louis, MO C / FFP TACOM, Detroit Arsenal, MI Nov 2024 Sep 2026 28 2,003.036 Y 2026 DRS Leonardo Sustainment Systems, Inc. / Saint Louis, MO C / FFP TACOM, Detroit Arsenal, MI Nov 2025 Sep 2027 20 2,203.000 Y 2027 DRS Leonardo Sustainment Systems, Inc. / Saint Louis, MO C / FFP TACOM, Detroit Arsenal, MI Jan 2027 Feb 2028 18 2,371.444 Y 2027 TBD / Saint Louis, MO C / FFP TACOM, Detroit Arsenal, MI Jan 2027 Feb 2028 30 800.000 N (Each) RFP Issue Date indicates the presence of a P-21 Remarks: The FY 2026 to FY 2027 per unit cost increase is attributable to mitigate a Live Fire Test and Evaluation safety concern, the Joint Assault Bridge (JAB) requires Bridge Launch Mechanism (BLM) Add on Armor (AoA) along with a Mission Ready Tablet (MRT). Thirty BLMs with MRT will be funded at $1.426 million per unit in FY 2027 (hardware plus installation). Overall production costs of the JAB remain consistent, adjusted for inflation. Current contract ends May 2026. A follow-on contract will be awarded prior to end of year 1Q FY 2027. LI 5225GZ3001 - Joint Assault Bridge Army UNCLASSIFIED Page 6 of 9 P-1 Line #13 Volume 1 - 97 === page 128 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 5225GZ3001 / Joint Assault Bridge Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: GZ3001 / Joint Assault Bridge Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Hardware - Full Rate Production (FRP) Prior Years Deliveries: 68 1 2025 ARMY 28 0 28 1 2026 ARMY 20 0 20 1 2027 ARMY 18 0 18 A - - - - - - - - - - - - - - - - - - - - - - A - - - - - - - - - - 2 - 26 20 18 JAB Bridge Launch Mechanism (BLM) Add on Armor (AoA) and Mission Ready Tablet (MRT) 2 2027 ARMY 30 0 30 30 O C T LI 5225GZ3001 - Joint Assault Bridge Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 9 S E P O C T N O V D E C J A N F E B P-1 Line #13 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 98 === page 129 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 5225GZ3001 / Joint Assault Bridge Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: GZ3001 / Joint Assault Bridge Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Hardware - Full Rate Production (FRP) Prior Years Deliveries: 68 1 2025 ARMY 28 2 26 1 2026 ARMY 20 0 20 1 2027 ARMY 18 0 18 2 2 - 2 - 2 - 3 3 3 3 2 2 2 - - - - - - - - A - - - - - - - - 0 2 2 - 2 - 2 - 2 - - 2 2 2 1 1 1 1 2 2 2 2 2 2 3 0 3 0 2 0 JAB Bridge Launch Mechanism (BLM) Add on Armor (AoA) and Mission Ready Tablet (MRT) 2 2027 ARMY 30 0 30 A O C T LI 5225GZ3001 - Joint Assault Bridge Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 9 S E P O C T N O V D E C J A N 4 F E B P-1 Line #13 4 M A R 4 A P R 4 M A Y 4 J U N 4 J U L 4 A U G S E P Volume 1 - 99 === page 130 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 5225GZ3001 / Joint Assault Bridge Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 Item Number / Title [DODIC]: GZ3001 / Joint Assault Bridge Production Rates (Each / Month) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 DRS Leonardo Sustainment Systems, Inc. - Saint Louis, MO 2 3 4 0 4 13 17 0 4 22 26 2 TBD - Saint Louis, MO 2 3 4 0 4 13 17 0 4 13 17 Remarks: n/a "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 5225GZ3001 - Joint Assault Bridge Army UNCLASSIFIED Page 9 of 9 P-1 Line #13 Volume 1 - 100 === page 131 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: 6500GA0750 / Abrams Upgrade Program Modification of Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0203735A Line Item MDAP/MAIS Code: N/A FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 2,177 30 33 22 - 22 25 25 44 61 Continuing Gross/Weapon System Cost ($ in Millions) 18,174.876 903.536 778.478 654.969 - 654.969 926.656 914.435 1,387.248 1,784.001 Continuing Less PY Advance Procurement ($ in Millions) 2,064.494 102.440 Net Procurement (P-1) ($ in Millions) 16,110.382 801.096 Resource Summary Prior Years Procurement Quantity (Units in Each) Plus CY Advance Procurement ($ in Millions) 2,166.934 Total Obligation Authority ($ in Millions) 18,277.316 - - 778.478 - 654.969 - 801.096 - - 778.478 654.969 - 654.969 - - 654.969 - - 926.656 - 914.435 - - 1,387.248 - 926.656 To FY 2031 Complete Continuing - 1,784.001 Continuing - 914.435 - 1,387.248 Total Continuing 2,166.934 Continuing - 1,784.001 Continuing 2,166.934 Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 8,348.588 30,117.867 23,590.242 29,771.318 - 29,771.318 37,066.240 36,577.400 31,528.364 29,245.918 Continuing Continuing Description: The Abrams Tank Program enables combat supremacy by producing and fielding the latest generation Abrams tanks, modifying the fielded tank fleet, and managing the industrial base (IB) recurring cost of daily operations and support of the production plants. This program focuses on planning, programming, budgeting, and executing all efforts required to produce the current and future Abrams tanks. The Abrams Program provides total package fielding and associated training devices to support fleet upgrades and modifications. The Abrams Tank Production Program funds the costs required for the daily operation of the production plants producing Abrams tanks and components. The Abrams Tank Production Program also mitigates production tank obsolescence through Bill of Materiel (BOM) screening, last chance buys, and hardware refresh projects. The Abrams Tank Fleet Modification Program provides System Technical Support (STS) for critical Abrams's suppliers. The program applies the Material Developer and Combat Developer approved modifications to the fielded Abrams Family Of Vehicles (FOV) either through field modifications at the unit or through application during vehicle recapitalization. The Abrams program continues to upgrade tanks through incorporation of Engineering Change Proposals (ECPs). These changes enhance tank survivability, lethality, supportability, and mobility while improving overall system reliability and durability. The M1A2 SEPv3 incorporates turret and hull armor upgrades, mine blast improvements, reactive armor tiles, lightweight belly armor, improved countermine equipment, Improvised Explosive Device (IED) jamming equipment, the Total Integrated Engine Revitalization (TIGER) engine, an upgraded transmission, an Auxiliary Power Unit (APU), improved power generation & distribution, Ammunition Data Link (ADL) for smart munitions, Embedded Training, Blue Force Tracker, Block 1 Second Generation Forward Looking Infra-Red (FLIR) technology, and improved computer systems with Line Replaceable Modules (LRMs) to include microprocessors, high-definition color flat panel displays, increased memory capacity, Gigabit Ethernet, and a new operating system designed to run the Common Operating Environment (COE) software. In FY 2027 the Abrams Production Program will begin building pilot production tanks of the new variant. The M1E3 is a major ECP redesign to substantially reduce weight, increase fuel efficiency, decrease crew cognitive burden, improve overall survivability, and provide a Modular Open Systems Architecture (MOSA). The initial pilot production vehicles will be used to prove out the modernized updated assembly line and validation of the updated manufacturing processes. Secondary Distribution Army Quantity Total Obligation Authority LI 6500GA0750 - Abrams Upgrade Program Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 30 33 22 - 22 25 25 44 61 801.096 778.478 654.969 - 654.969 926.656 914.435 1,387.248 1,784.001 UNCLASSIFIED Page 1 of 11 P-1 Line #14 Volume 1 - 101 === page 132 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: 6500GA0750 / Abrams Upgrade Program Modification of Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0203735A Line Item MDAP/MAIS Code: N/A Secondary Distribution Total: Secondary Distribution Quantity Total Obligation Authority LI 6500GA0750 - Abrams Upgrade Program Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 30 33 22 - 22 25 25 44 61 801.096 778.478 654.969 - 654.969 926.656 914.435 1,387.248 1,784.001 UNCLASSIFIED Page 2 of 11 P-1 Line #14 Volume 1 - 102 === page 133 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: 6500GA0750 / Abrams Upgrade Program Modification of Tracked Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0203735A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 GA0750 / Abrams Upgrade Program P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 2,177 / 18,174.876 30 / 903.536 33 / 778.478 22 / 654.969 - / - 22 / 654.969 2,177 / 18,174.876 30 / 903.536 33 / 778.478 22 / 654.969 - / - 22 / 654.969 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Base Procurement dollars in the amount of $654.969 million supports the following: The continued upgrade and assembly of Abrams M1A2 System Enhancement Package version 3 (SEPv3) tank variants begin at Anniston Army Depot (ANAD) where vehicle and component refurbishment occur and culminate at the Joint Systems Manufacturing Center (JSMC) in Lima, OH by General Dynamics Land Systems (GDLS). These dollars also include the recurring costs required for the daily operation and support of the production plant to include utilities and Energy Savings Performance Contract (ESPC) payments, manufacturing studies, security, inspections, and minor emergency repairs. This funding also supports the following Field Modification efforts - procurement and installation of field modification hardware, System Technical Support (STS) efforts, continued support of the Total Integrated Engine Revitalization (TIGER) and Transmission programs; Direct Support Electrical Systems Test Set (DSESTS); upgrades to Training Aids, Devices, Simulators and Simulations (TADSS); logistics support to facilitate the installation of the improved Active Protection System (APS) which is critical to counter anti-armor capabilities in near-peer adversaries; the procurement of Government Furnished Equipment (GFE), Common Remote Operated Weapon Station Low Profile (CROWS-LP), gun tubes, engines, transmissions, and mounting hardware for Mine Plows and Rollers; as well as program management support for dayto-day operations for the entire Abrams Tank ECP program. The FY 2027 procurement dollars will further support production of M1E3 tanks and prove out the new assembly line and production process updates. Note: The Abrams calculation for the Unit Cost is the sum of the Upgrade Vehicle Production (Basic Vehicle), Upgrade Government Furnished Equipment (GFE), Upgrade Vehicle and Component Refurbishment, and Upgrade Total Package Fielding (TPF) divided by vehicle quantity (see Exhibit P-5). The Average Procurement Unit Cost (APUC) for FY 2027 is dependent upon ongoing contract negotiations. In accordance with section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110 - 181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 6500GA0750 - Abrams Upgrade Program Army UNCLASSIFIED Page 3 of 11 P-1 Line #14 Volume 1 - 103 === page 134 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6500GA0750 / Abrams Upgrade Program Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: GA0750 / Abrams Upgrade Program MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total 2,177 30 33 22 - 22 18,174.876 903.536 778.478 654.969 - 654.969 Less PY Advance Procurement ($ in Millions) 2,064.494 102.440 Net Procurement (P-1) ($ in Millions) 16,110.382 801.096 Gross/Weapon System Cost ($ in Millions) Plus CY Advance Procurement ($ in Millions) 2,166.934 Total Obligation Authority ($ in Millions) 18,277.316 - - 778.478 - - 801.096 - 654.969 - 778.478 - - 654.969 - 654.969 - - 654.969 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 8,348.588 - 30,117.867 - 23,590.242 - 29,771.318 - - 29,771.318 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Unit Cost 2,471 10,237.122 6,704.933 Qty (Each) ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Base Total Cost Unit Cost 242.918 11,985.591 ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost (†) Basic Vehicle 4,142.907 30 Government Furnished Equipment (GFE) - - 2,522.314 - - Upgrade Government Furnished Equipment (GFE) - - 942.591 - - Pre-Modification Vehicle Teardown/ Refurb - - 682.084 - - Upgrade Vehicle and Component Refurbishment - - 387.380 - TPF/New Equipment Training - - 329.113 Total Package Fielding (TPF) - - Field Modifications - - Production Support Activities - - Field Modifications Installation - Training Devices - 201.148 33 - - - - - - - - 49.285 - - - - 116.832 - - 729.981 - - - - - - - - - - - LI 6500GA0750 - Abrams Upgrade Program Army - 7,361.152 263.683 - - 11,985.591 22 - - - - - - - - - - 263.683 - - - - - - - - - - - - - - 45.232 - - 41.619 - - - - - 41.619 - - - - - - - - - - - - 29.053 - - 20.509 - - 20.027 - - - - - 20.027 - - - - - - - - - - - - - 165.086 - - 103.151 - - 48.287 - - - - - 48.287 - 21.443 - - 19.330 - - 21.000 - - - - - 21.000 - 22.930 - - 20.367 - - 1.903 - - - - - 1.903 254.973 UNCLASSIFIED Page 4 of 11 - - - 238.438 - 22 192.912 P-1 Line #14 - 192.912 Volume 1 - 104 === page 135 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6500GA0750 / Abrams Upgrade Program Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: GA0750 / Abrams Upgrade Program MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Active Protection System - - - - 12.439 - - 10.817 - - 4.536 - - - - - 4.536 Government Support - - 1,233.261 - - - - - - - - - - - - - - - Government Program Support - - 144.224 - - 59.923 - - 61.181 - - 61.002 - - - - - 61.002 Transmissions - - 288.344 - - - - - - - - - - - - - - - Forward Looking Infrared (FLIR) - - 476.848 - - - - - - - - - - - - - - - Industrial Base Mitigation Support/ Facilities Optimization and Maintenance - - 185.429 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 18,275.523 - - - - - - - - - - - FY 2019 NDAA SEC 825 MDAP Cost Overrun - - 1.793 - - - - - - - - - - - - - - Advance Procurement Adjustments - - -102.440 - - 102.440 - - - - - - - - - - - 0.000 Subtotal: Non Recurring Cost - - -100.647 - - 102.440 - - - - - - - - - - - - - 18,174.876 - - 902.185 - - - - - - - - - Abrams Reactive Armor Tile Installation Kits - - - - - 1.351 - - - - - - - - - - - - Subtotal: Non Recurring Cost - - - - - 1.351 - - - - - - - - - - - - - - - - - 1.351 - - - - - - - - - - - - 30 903.536 - - - - 799.745 778.478 654.969 654.969 Non Recurring Cost Subtotal: Flyaway Cost - 778.478 654.969 654.969 Hardware Cost Non Recurring Cost Subtotal: Hardware Cost Gross/Weapon System Cost 8,348.588 2,177 18,174.876 30,117.867 23,590.242 33 778.478 29,771.318 22 654.969 29,771.318 22 654.969 Remarks: Abrams calculation for unit cost is the sum of Upgrade Vehicle Production (Basic Vehicle), Upgrade Government Furnished Equipment (GFE), Upgrade Vehicle and Component Refurbishment, and Upgrade Total Package Fielding (TPF) divided by vehicle quantity. The Average Procurement Unit Cost (APUC) for FY 2027 is dependent upon ongoing contract negotiations. LI 6500GA0750 - Abrams Upgrade Program Army UNCLASSIFIED Page 5 of 11 P-1 Line #14 Volume 1 - 105 === page 136 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 P-1 Line Item Number / Title: 6500GA0750 / Abrams Upgrade Program ID Code (A=Service Ready, B=Not Service Ready) : A Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority Item Number / Title [DODIC]: GA0750 / Abrams Upgrade Program MDAP/MAIS Code: FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total 30 33 22 - 22 801.096 778.478 654.969 - 654.969 30 33 22 - 22 801.096 778.478 654.969 - 654.969 indicates the presence of a P-5a LI 6500GA0750 - Abrams Upgrade Program Army UNCLASSIFIED Page 6 of 11 P-1 Line #14 Volume 1 - 106 === page 137 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 Cost Elements (†) O O C P-1 Line Item Number / Title: 6500GA0750 / Abrams Upgrade Program FY Contractor and Location Method/Type or Funding Vehicle Item Number / Title [DODIC]: GA0750 / Abrams Upgrade Program Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) Basic Vehicle (†) 2025 GDLS / Sterling Heights, MI SS / FPIF TACOM-Warren Mar 2025 Jan 2027 30 Basic Vehicle (†) 2026 GDLS / Sterling Heights, MI SS / FPIF TACOM-Warren Mar 2026 Sep 2027 Basic Vehicle (†) 2027 GDLS / Sterling Heights, MI SS / FPIF TACOM-Warren Mar 2027 Sep 2028 6,704.933 N 33 7,361.152 N 22 11,985.591 N RFP Issue Date indicates the presence of a P-21 Remarks: GDLS-Prime Contractor, Sterling Heights, MI Manufactured at the Joint Systems Manufacturing Center (JSMC), Lima, OH LI 6500GA0750 - Abrams Upgrade Program Army UNCLASSIFIED Page 7 of 11 P-1 Line #14 Volume 1 - 107 === page 138 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6500GA0750 / Abrams Upgrade Program Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: GA0750 / Abrams Upgrade Program Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Basic Vehicle Prior Years Deliveries: 2471 1 2025 ARMY 30 0 30 1 2026 ARMY 33 0 33 1 2027 ARMY 22 0 22 A - - - - - - - - - - - - - - - - - - - 30 A - - - - - - - 33 22 O C T N O V LI 6500GA0750 - Abrams Upgrade Program Army D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #14 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 108 === page 139 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6500GA0750 / Abrams Upgrade Program Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: GA0750 / Abrams Upgrade Program Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Basic Vehicle Prior Years Deliveries: 2471 1 2025 ARMY 30 0 30 - - - 1 2026 ARMY 33 0 33 - - - 1 2027 ARMY 22 0 22 O C T N O V LI 6500GA0750 - Abrams Upgrade Program Army D E C 3 4 J A N 4 F E B 4 4 4 4 3 - - - - - - A - - - - - - M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 11 0 2 2 S E P 2 O C T 2 N O V 2 D E C 3 J A N 3 F E B P-1 Line #14 3 M A R 3 A P R 3 M A Y 3 J U N 5 J U L 0 A U G 2 20 S E P Volume 1 - 109 === page 140 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6500GA0750 / Abrams Upgrade Program Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: GA0750 / Abrams Upgrade Program Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Basic Vehicle Prior Years Deliveries: 2471 1 2025 ARMY 30 30 0 1 2026 ARMY 33 33 0 1 2027 ARMY 22 2 20 0 0 2 O C T 2 N O V LI 6500GA0750 - Abrams Upgrade Program Army 1 D E C 1 J A N 2 F E B 2 M A R 2 A P R 2 M A Y 1 J U N 3 J U L 2 A U G UNCLASSIFIED Page 10 of 11 0 S E P O C T N O V D E C J A N F E B P-1 Line #14 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 110 === page 141 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6500GA0750 / Abrams Upgrade Program Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: GA0750 / Abrams Upgrade Program Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 GDLS - Sterling Heights, MI MSR For 2027 1-8-5 For 2027 MAX For 2027 2 12 37 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 14 18 Total After Oct 1 ALT Prior to Oct 1 32 ALT After Oct 1 0 Manufacturing PLT 5 Total After Oct 1 18 23 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 6500GA0750 - Abrams Upgrade Program Army UNCLASSIFIED Page 11 of 11 P-1 Line #14 Volume 1 - 111 === page 142 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: 6652GM1900 / VEHICLE PROTECTION SYSTEMS (VPS) Modification of Tracked Combat Vehicles Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 91.864 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 91.864 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 91.864 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 283 1,917 389 - 389 389 515 515 515 - 4,523 133.492 107.833 16.134 - 16.134 16.458 23.094 156.812 23.778 - 569.465 - - 133.492 107.833 - - 133.492 107.833 - - - - - 16.134 - 16.134 16.458 23.094 - - - - - 16.134 - 16.134 16.458 23.094 To FY 2031 Complete 156.812 156.812 - - 23.778 - - - 23.778 - Total 569.465 569.465 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - 56.251 41.476 - 41.476 42.308 44.843 46.171 - 471.703 304.489 125.904 Description: The Vehicle Protection Suite (VPS) will evaluate, mature, and integrate onto multiple combat and tactical vehicles, combinations of active, reactive and passive protection capabilities. These capabilities will leverage both Horizontal Technology Integration (HTI) principles and the Modular Open System Architecture with the Army's Vehicle Protection System Base Kit (VBK) to develop tailored vehicle Survivability Sets specific to platforms that will mitigate existing protection gaps, allow for future technology insertion to mitigate and defeat evolving threats, and minimize the impact to the current capabilities hosted on Army ground combat and tactical vehicles. The protection capabilities will leverage technologies across a spectrum of survivability mechanisms including detection avoidance, threat detection, threat intercept and threat mitigation. (GM1911) - VPS Base Kit with Laser Warning Receiver The Laser Warning Receiver (LWR) will detect enemy military laser aided threats and provide rapid warning of threat type and signal direction to the VPS Base Kit. LWR will be able to detect the broad array of laser aided threats that ground combat vehicles will face operationally. The system will alert the crew to which of the threats are targeting the system and allow for the crew to respond based on that threat. Threat timelines are critical to the response of the vehicle crew and the ability to counter the threat. The Laser Warning Receiver will provide early warning to laser aided threat elements. (GM1912) - VPS Signature Management Signature Management paint is designed to be integrated with no changes to the combat vehicles' baseline paint. This program is intended to be used on all combat vehicles, with future expansion to other U.S. Army vehicle systems. Signature Management is the Vehicle Protection System baseline layer for the signature management architecture. Future Vehicle Protection technologies may be layered in coordination with this program. The Signature Management program is currently planned to be implemented as a production cut-in and/or retrofit to the enduring fleet onto multiple ground combat vehicle platforms. (GM1914) - VPS Top Attack Protection Top Attack Protection (TAP) is an add-on armor to the base vehicle configuration. TAP is intended to be installed on all combat vehicles with future expansion to other US Army vehicle systems. The Top Attack Protection (TAP) quantity per platform varies based on platform base armor. Secondary Distribution Army Quantity Total Obligation Authority FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 283 1,917 389 - 389 389 515 515 515 133.492 107.833 16.134 - 16.134 16.458 23.094 156.812 23.778 LI 6652GM1900 - VEHICLE PROTECTION SYSTEMS (VPS) Army UNCLASSIFIED Page 1 of 12 P-1 Line #15 Volume 1 - 112 === page 143 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: 6652GM1900 / VEHICLE PROTECTION SYSTEMS (VPS) Modification of Tracked Combat Vehicles Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Secondary Distribution Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 283 1,917 389 - 389 389 515 515 515 133.492 107.833 16.134 - 16.134 16.458 23.094 156.812 23.778 LI 6652GM1900 - VEHICLE PROTECTION SYSTEMS (VPS) Army UNCLASSIFIED Page 2 of 12 P-1 Line #15 Volume 1 - 113 === page 144 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 01: Tracked Combat Vehicles / BSA 20: 6652GM1900 / VEHICLE PROTECTION SYSTEMS (VPS) Modification of Tracked Combat Vehicles Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits P-5 GM1911 / VPS MODULAR ACTIVE PROTECTION SYSTEMS W/ LASER P-5a P-5 GM1912 / VPS SIGNATURE MANAGEMENT P-5a P-5 GM1914 / VPS TOP ATTACK PROTECTION P-5a P-40 Total Gross/Weapon System Cost ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 87.257 - / 4.607 - - 283 / 133.492 / 0.852 / - - / - 1,528 / 91.714 283 / 133.492 1,917 / 107.833 / / 91.864 - - 389 / 15.267 / 0.860 - / - 389 / 15.274 - - / - / - - / - 389 / 16.134 - / - - - / 0.860 389 / 15.274 - / - 389 / 16.134 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Base Procurement dollars in the amount of $16.134 million supports the following: (GM1911) VPS Base Kits (VBK) with Laser Warning Receiver (LWR). Funding supports Laser Warning Receiver and Vehicle Base Kit receipt, storage, integration, A kit procurement and installation. (GM1912) VPS Signature Management. Funds are required to procure and apply Signature Management Paint onto 389 vehicles across multiple ground combat platforms. In accordance with section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110 - 181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 6652GM1900 - VEHICLE PROTECTION SYSTEMS (VPS) Army UNCLASSIFIED Page 3 of 12 P-1 Line #15 Volume 1 - 114 === page 145 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6652GM1900 / VEHICLE PROTECTION SYSTEMS (VPS) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: GM1911 / VPS MODULAR ACTIVE PROTECTION SYSTEMS W/LASER MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 - Gross/Weapon System Cost ($ in Millions) 87.257 Less PY Advance Procurement ($ in Millions) FY 2026 133.492 - Net Procurement (P-1) ($ in Millions) 133.492 - Total Obligation Authority ($ in Millions) FY 2027 OOC - - - 0.852 0.860 - 0.860 - - - - 0.852 0.860 - 0.860 - - - - 0.852 0.860 - 0.860 - - - - - - - - - 87.257 Plus CY Advance Procurement ($ in Millions) FY 2027 Base - 283 - 87.257 133.492 FY 2027 Total (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 471.703 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Manufacturing Vehicle Base Kit with Laser Warning 448.688 138 61.919 - 61.919 17 - 354.269 283 100.258 - - - - - - - - - - - - - - 100.258 - - - - - - - - - - - - 7.620 - - - - - - - - - - - - - - - - 7.620 - - - - - - - - - - - - - - - - - 69.539 - - 100.258 - - - - - - - - - - - - Integrated Logistics Support - - 17.718 - - 33.234 - - 0.852 - - 0.860 - - - - - 0.860 Subtotal: Support - Logistics Cost - - 17.718 - - 33.234 - - 0.852 - - 0.860 - - - - - 0.860 Gross/Weapon System Cost - - 87.257 283 133.492 - - 0.852 - - 0.860 - - - - - 0.860 (†) Receiver Subtotal: Recurring Cost - Non Recurring Cost Initial Spares - Vehicle Base Kit with Laser Warning Receiver Subtotal: Non Recurring Cost Subtotal: Hardware Cost 448.235 Support - Logistics Cost 471.703 Remarks: Logistics Cost Element includes A kit Procurement, Installation and Storage. LI 6652GM1900 - VEHICLE PROTECTION SYSTEMS (VPS) Army UNCLASSIFIED Page 4 of 12 P-1 Line #15 Volume 1 - 115 === page 146 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 P-1 Line Item Number / Title: 6652GM1900 / VEHICLE PROTECTION SYSTEMS (VPS) ID Code (A=Service Ready, B=Not Service Ready) : Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority Item Number / Title [DODIC]: GM1911 / VPS MODULAR ACTIVE PROTECTION SYSTEMS W/LASER MDAP/MAIS Code: FY 2025 FY 2027 Base FY 2026 283 133.492 283 133.492 FY 2027 OOC FY 2027 Total - - - - 0.852 0.860 - 0.860 - - - - 0.852 0.860 - 0.860 indicates the presence of a P-5a LI 6652GM1900 - VEHICLE PROTECTION SYSTEMS (VPS) Army UNCLASSIFIED Page 5 of 12 P-1 Line #15 Volume 1 - 116 === page 147 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 Cost Elements Manufacturing - Vehicle Base Kit with Laser Warning Receiver O O C P-1 Line Item Number / Title: 6652GM1900 / VEHICLE PROTECTION SYSTEMS (VPS) FY Contractor and Location 2025 Danbury Mission Technologies / LockHeed Martin / Danbury, CT / Orlando, FL LI 6652GM1900 - VEHICLE PROTECTION SYSTEMS (VPS) Army Method/Type or Funding Vehicle SS / IDIQ Location of PCO Army Contracting Command Warren, MI UNCLASSIFIED Page 6 of 12 Award Date Date of First Delivery Mar 2025 Jul 2026 P-1 Line #15 Item Number / Title [DODIC]: GM1911 / VPS MODULAR ACTIVE PROTECTION SYSTEMS W/LASER Qty (Each) 283 Specs Date Unit Cost Avail Revision Now? Available ($ K) 354.269 RFP Issue Date Y Volume 1 - 117 === page 148 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6652GM1900 / VEHICLE PROTECTION SYSTEMS (VPS) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: GM1912 / VPS SIGNATURE MANAGEMENT MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total - - 389 389 - 389 4.607 - 15.267 15.274 - 15.274 - - - - - - 4.607 - 15.267 15.274 - 15.274 - - - - - - 4.607 - 15.267 15.274 - 15.274 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - 39.247 39.265 - 39.265 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Production Manufacturing - 11.026 269 2.966 - - - 12.491 389 4.859 12.501 389 4.863 - - - 12.501 389 4.863 Production Manufacturing Application Labor, Tools and Supplies - - 1.641 - - - - - 8.989 - - 8.992 - - - - - 8.992 Subtotal: Recurring Cost - - 4.607 - - - - - 13.848 - - 13.855 - - - - - 13.855 - - 4.607 - - - - - 13.848 - - 13.855 - - - - - 13.855 Material (†) Subtotal: Hardware Cost Support - Program Management Cost Government Management - - - - - - - - 1.419 - - 1.419 - - - - - 1.419 Subtotal: Support - Program Management Cost - - - - - - - - 1.419 - - 1.419 - - - - - 1.419 Gross/Weapon System Cost - - 4.607 - - - 39.247 389 15.267 39.265 389 15.274 - - - 39.265 389 15.274 Secondary Distribution Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total Quantity - 389 389 - 389 Total Obligation Authority - 15.267 15.274 - 15.274 LI 6652GM1900 - VEHICLE PROTECTION SYSTEMS (VPS) Army UNCLASSIFIED Page 7 of 12 P-1 Line #15 Volume 1 - 118 === page 149 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 P-1 Line Item Number / Title: 6652GM1900 / VEHICLE PROTECTION SYSTEMS (VPS) ID Code (A=Service Ready, B=Not Service Ready) : Secondary Distribution Total: Secondary Distribution (†) Item Number / Title [DODIC]: GM1912 / VPS SIGNATURE MANAGEMENT MDAP/MAIS Code: FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total Quantity - 389 389 - 389 Total Obligation Authority - 15.267 15.274 - 15.274 indicates the presence of a P-5a LI 6652GM1900 - VEHICLE PROTECTION SYSTEMS (VPS) Army UNCLASSIFIED Page 8 of 12 P-1 Line #15 Volume 1 - 119 === page 150 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 Cost Elements Production Manufacturing - Material Production Manufacturing - Material O O C P-1 Line Item Number / Title: 6652GM1900 / VEHICLE PROTECTION SYSTEMS (VPS) Method/Type or Funding Vehicle Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($ K) FY Contractor and Location 2026 CTC Enterprise Ventures Corporation / Hentzen Coatings, Inc. / Johnstown, PA / Milwaukee, WI SS / IDIQ Army Contracting Command Warren, MI Apr 2026 Jun 2026 389 12.491 Y 2027 CTC Enterprise Ventures Corporation / Hentzen Coatings, Inc. / Johnstown, PA / Milwaukee, WI SS / IDIQ Army Contracting Command Warren, MI Apr 2027 Jun 2027 389 12.501 Y LI 6652GM1900 - VEHICLE PROTECTION SYSTEMS (VPS) Army Location of PCO Award Date Item Number / Title [DODIC]: GM1912 / VPS SIGNATURE MANAGEMENT UNCLASSIFIED Page 9 of 12 P-1 Line #15 (Each) RFP Issue Date Volume 1 - 120 === page 151 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6652GM1900 / VEHICLE PROTECTION SYSTEMS (VPS) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: GM1914 / VPS TOP ATTACK PROTECTION MDAP/MAIS Code: FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 1,528 - - - Gross/Weapon System Cost ($ in Millions) - - 91.714 - - - Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - 91.714 - - - Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - 91.714 - - - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - 60.022 - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Manufacturing - Top - - - - - - 55.418 1,528 84.678 - - - - - - - - - - - - - - - - - 84.678 - - - - - - - - - Manufacturing - First Article Test - - - - - - - - 2.287 - - - - - - - - - Subtotal: Non Recurring Cost - - - - - - - - 2.287 - - - - - - - - - - - - - - - - - 86.965 - - - - - - - - - Packaging, Containers, and Transportation - - - - - - - - 3.304 - - - - - - - - - Subtotal: Recurring Cost - - - - - - - - 3.304 - - - - - - - - - Subtotal: Package Fielding Cost - - - - - - - - 3.304 - - - - - - - - - - - - - - - - - 1.444 - - - - - - - - - Attack Protection (†) Subtotal: Recurring Cost Non Recurring Cost Subtotal: Hardware Cost Package Fielding Cost Recurring Cost Support - Program Management Cost Government Management LI 6652GM1900 - VEHICLE PROTECTION SYSTEMS (VPS) Army UNCLASSIFIED Page 10 of 12 P-1 Line #15 Volume 1 - 121 === page 152 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6652GM1900 / VEHICLE PROTECTION SYSTEMS (VPS) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: GM1914 / VPS TOP ATTACK PROTECTION MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Subtotal: Support - Program Management Cost - - - - - - - - 1.444 - - - - - - - - - Gross/Weapon System Cost - - - - - - 60.022 1,528 91.714 - - - - - - - - - Remarks: Manufacturing quantity of 1,528 represents the number of vehicles in an Armored Brigade Combat Team the Top Attack Protection is procured for. The VPS Top Attack Protection program was funded only in Fiscal Year 2026 as an initial capability procurement to address emerging threats. Secondary Distribution Army Total: Secondary Distribution (†) FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total Quantity - 1,528 - - - Total Obligation Authority - 91.714 - - - Quantity - 1,528 - - - Total Obligation Authority - 91.714 - - - indicates the presence of a P-5a LI 6652GM1900 - VEHICLE PROTECTION SYSTEMS (VPS) Army UNCLASSIFIED Page 11 of 12 P-1 Line #15 Volume 1 - 122 === page 153 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 01 / 20 Cost Elements Manufacturing - Top Attack Protection O O C P-1 Line Item Number / Title: 6652GM1900 / VEHICLE PROTECTION SYSTEMS (VPS) FY Contractor and Location Method/Type or Funding Vehicle 2026 TBD / TBD C / TBD LI 6652GM1900 - VEHICLE PROTECTION SYSTEMS (VPS) Army Location of PCO Army Contracting Command Warren, MI UNCLASSIFIED Page 12 of 12 Award Date Date of First Delivery Jun 2026 Jan 2028 P-1 Line #15 Item Number / Title [DODIC]: GM1914 / VPS TOP ATTACK PROTECTION Qty (Each) 1,528 Specs Date Unit Cost Avail Revision Now? Available ($ K) 55.418 Y RFP Issue Date Jul 2025 Volume 1 - 123 === page 154 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 0418GN0003 / PERSONAL DEFENSE WEAPON (ROLL) Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 10: Weapons & Other Combat Vehicles Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) 1,064 2,311 477 - - - - - - - - 3,852 Gross/Weapon System Cost ($ in Millions) 10.150 4.869 1.002 - - - - - - - - 16.021 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) - - - - - - - - - - - - 10.150 4.869 1.002 - - - - - - - - 16.021 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) - - - - - - - - - - - - 10.150 4.869 1.002 - - - - - - - - 16.021 - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - 9.539 2.107 2.101 - - - - - - - - 4.159 Gross/Weapon System Unit Cost ($ in Thousands) Description: (G00013) - Launched Electronic Stun Device (LESD): Launched Electrode Stun Device (LESD) is a Commercial Off the shelf (COTS) weapon. It fires tethered probes that attach to target, transmitting an electrical charge which induces Electro-muscular Incapacitation (EMI), overriding sensory and motor systems. It provides Law Enforcement, Special Forces and Ranger Battalions non-lethal escalation of force capabilities. This item is Code A, approved for service use. Secondary Distribution Army ANG AR Total: Secondary Distribution FY 2025 Quantity FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 139 - - - - - - - - Total Obligation Authority 0.293 - - - - - - - - Quantity 1,442 477 - - - - - - - Total Obligation Authority 3.038 1.002 - - - - - - - 730 - - - - - - - - Total Obligation Authority 1.538 - - - - - - - - Quantity 2,311 477 - - - - - - - Total Obligation Authority 4.869 1.002 - - - - - - - Quantity Justification: There is no Fiscal Year 2027 budget request for this funding line. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 0418GN0003 - PERSONAL DEFENSE WEAPON (ROLL) Army UNCLASSIFIED Page 1 of 1 P-1 Line #16 Volume 1 - 124 === page 155 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 2472G13000 / M240 Medium Machine Gun (7.62mm) Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 10: Weapons & Other Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: 0604601A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total 0 260 - - - - - - - - 948 872.119 27.851 6.005 - - - - - - - - 905.975 - - - - - - - - - - 27.851 6.005 - - - - - - - - - - - - - - - - - - 27.851 6.005 - - - - - - - - 872.119 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2026 688 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2025 872.119 905.975 905.975 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - 23.096 - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 1,267.615 955.670 Description: The M240 Medium Machine Gun (7.62mm) program supports the Army Modernization priorities (Build a More Lethal Force) through enhancement of Joint Lethality in contested environments by minimizing and eliminating erosion of close combat capability relative to peer competitors in complex terrain as outlined in the National Defense Strategy (NDS). The M240 series machine guns are available in different configurations for various applications. The M240B Machine Gun is a ground version of the original M240 Machine Gun, 7.62MM Medium Machine Gun class weapon, designed as a coaxial/pintle-mounted weapon for tanks and light armored vehicles. The M240B also includes: a flash suppressor, front sight, carrying handle, buttstock, pistol grip, bipod, heat shield and rear sight assembly. The M240B Machine Gun may also be tripod-mounted and used in conjunction with a traversing and elevating mechanism and mount pintle. The M240H is a variant of this same family of Machine Guns and is employed as the self defensive armament subsystem for the UH-60 BLACK HAWK and CH-47 Chinook Helicopters. The M240H uses the same receiver and barrel as the M240B but has a spade grip trigger assembly. It also has a unique mounting interface and pintle to properly interface with the helicopter platform. The lighter M240L replaces the M240B in Special Forces/Rangers, Light Infantry and Airborne units. The M240L significantly reduces the weight of the current M240B, by approximately 6 pounds, while maintaining the same level of reliability. The weight reduction is accomplished through the use of lightweight materials and innovative manufacturing techniques. Secondary Distribution Army FY 2025 Quantity Total Obligation Authority Total: Secondary Distribution FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - 260 - - - - - - - 27.851 6.005 - - - - - - - - 260 - - - - - - - 27.851 6.005 - - - - - - - Quantity Total Obligation Authority FY 2026 Justification: There is no Fiscal Year 2027 budget request for this funding line. LI 2472G13000 - M240 Medium Machine Gun (7.62mm) Army UNCLASSIFIED Page 1 of 1 P-1 Line #17 Volume 1 - 125 === page 156 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 5000GB2000 / Machine Gun, Cal .50 M2 Roll Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 10: Weapons & Other Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 236 0.003 0.004 - - - - - - - - 421.301 - - - - - - - - - - 0.003 0.004 - - - - - - - - - - - - - - - - - - 0.003 0.004 - - - - - - - - 421.294 421.294 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2026 236 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2025 421.294 To FY 2031 Complete Total 421.301 421.301 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 1,785.144 1,785.174 Description: The M2A1 .50 Caliber Machine Gun is an automatic, belt-fed, recoil-operated, and air-cooled crew-served weapon. It mounts on the M205 tripod and on most vehicles, and serves as an anti-personnel and antiaircraft weapon. It is highly effective against light armored vehicles, low-and slow-flying aircraft, and small boats. The M2A1 provides automatic weapon suppressive fire for offensive and defensive purposes. It is capable of single-shot and automatic fire. The M2A1 provides enhancements to allow the Soldier to quickly change barrels without the need to reset the headspace and timing while also reducing the visible muzzle flash. Secondary Distribution Army FY 2025 Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 0.003 0.004 - - - - - - - - - - - - - - - - 0.003 0.004 - - - - - - - Justification: There is no Fiscal Year 2027 budget request for this funding line. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 5000GB2000 - Machine Gun, Cal .50 M2 Roll Army UNCLASSIFIED Page 1 of 1 P-1 Line #18 Volume 1 - 126 === page 157 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 6580G02200 / Mortar Systems Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 10: Weapons & Other Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 6 3 2 - 2 38 68 86 555.690 73.408 5.807 3.575 - 3.575 45.098 67.198 102.056 - - - - - - - 73.408 5.807 3.575 - 3.575 45.098 67.198 555.690 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2026 32 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2025 555.690 To FY 2031 Complete 98 Continuing 105.857 - - - - - - - - 73.408 5.807 3.575 - 3.575 45.098 67.198 Continuing - 102.056 105.857 - 105.857 Continuing - Continuing - 102.056 Total Continuing Continuing - - Continuing Continuing - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 17,365.313 12,234.667 1,935.667 1,787.500 - 1,787.500 1,186.789 988.206 1,186.698 1,080.173 Continuing Continuing Description: The Mortar Systems program supports the production of 60mm, 81mm, 120mm mortar weapon systems, and future variants/modernized systems; including mortar mobility system and associated supporting subsystems, Basic Issue Items (BII), Additional Authorized List (AAL) items, and tool kits. These mortar weapon systems, along with the associated equipment and subsystem components support both the mounted and dismounted vehicle platforms in the Infantry Brigade Combat Teams (IBCTs)/ Mobile Brigade Combat Teams (MBCTs), Armor Brigade Combat Teams (ABCTs), and Stryker Brigade Combat Teams (SBCTs). The mobility systems enable rapid emplacement and displacement of mortar weapon systems, when hosted on current and future vehicle platforms. The 60mm, 81mm and 120mm mortar weapon systems and components fulfill current and future Army Acquisition Objective (AAO) requirements, urgent requirements, increase of Army reorganization and Army stand up unit requirements, and address mortar system safety and obsolescence concerns. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 6 3 2 - 2 38 68 86 98 73.408 5.807 3.575 - 3.575 45.098 67.198 102.056 105.857 6 3 2 - 2 38 68 86 98 73.408 5.807 3.575 - 3.575 45.098 67.198 102.056 105.857 Justification: Fiscal Year (FY) 2027 funding in the amount of $3.575 million will support the procurement of two (2) each M121 120mm mortar weapon systems, required subsystem components, Modified Work Order (MWO) kits, Basic Issue Item (BII) kits, Engineering Change Proposals (ECPs), and updates required to the applicable Technical Data Packages (TDPs). Funding will also support efforts to address technical issues and obsolescence related to weapon system safety, special force requirements and modernized mounted and dismounted platforms in the Armor Brigade Combat Teams (ABCTs), as well as Armor Multi-Purpose Vehicle (AMPV) requirements. Funding is to support 120mm mortar weapon systems resulting from Army ABCT reorganization from two Battalions per Brigade to three Battalions per Brigade as well as the increase in the Army Acquisition Objective (AAO) for new stand-up units. LI 6580G02200 - Mortar Systems Army UNCLASSIFIED Page 1 of 2 P-1 Line #19 Volume 1 - 127 === page 158 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 10: Weapons & Other Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 6580G02200 / Mortar Systems Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Net funding decrease from FY 2026 to FY 2027 reflects the completion of the program's acquisition strategy as the Army continues to develop and qualify modernized mortar weapon systems that will increase lethality, survivability, mobility and readiness. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L.110-181) this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 6580G02200 - Mortar Systems Army UNCLASSIFIED Page 2 of 2 P-1 Line #19 Volume 1 - 128 === page 159 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 6659G08100 / LOCATION & AZIMUTH DETERMINATION SYSTEM (LADS) Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 10: Weapons & Other Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 126 - - - - - - - - - Continuing Gross/Weapon System Cost ($ in Millions) 48.902 2.543 9.477 10.420 - 10.420 2.082 1.913 0.964 - Continuing Less PY Advance Procurement ($ in Millions) - - - - - - - - - - 48.902 2.543 9.477 10.420 - 10.420 2.082 1.913 0.964 - Resource Summary Prior Years Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) To FY 2031 Complete Total Continuing Continuing Continuing Continuing - - - - - - - - - - - - 48.902 2.543 9.477 10.420 - 10.420 2.082 1.913 0.964 - Continuing Continuing - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 388.111 Continuing Continuing Description: The Location and Azimuth Determination System (LADS) provides a lightweight, portable, and deployable common inertial survey capability for field artillery cannon, rocket, missile, radar and mortar platforms that is not dependent on the Global Positioning System (GPS). LADS replaces the legacy Improved Position and Azimuth Determining System - GPS (IPADS-G) which is no longer supportable and obsolete. LADS is operable by multiple military occupational specialties (MOS) and can be integrated into multiple vehicles. Secondary Distribution Army Quantity Total: Secondary Distribution FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 2.543 9.477 10.419 - 10.419 2.082 1.913 0.964 - Quantity - - - - - - - - - Total Obligation Authority - - 0.001 - 0.001 - - - - Quantity - - - - - - - - - 2.543 9.477 10.420 - 10.420 2.082 1.913 0.964 - Total Obligation Authority ANG FY 2025 Total Obligation Authority LI 6659G08100 - LOCATION & AZIMUTH DETERMINATION SYSTEM ... Army UNCLASSIFIED Page 1 of 4 P-1 Line #20 Volume 1 - 129 === page 160 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 6659G08100 / LOCATION & AZIMUTH DETERMINATION SYSTEM (LADS) Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 10: Weapons & Other Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 G08112 / LOCATION & AZIMUTH DETERMINATION SYSTEM 126 / 48.902 - / 2.543 - / 9.477 - / 10.420 - / - - / 10.420 P-40 Total Gross/Weapon System Cost 126 / 48.902 - / 2.543 - / 9.477 - / 10.420 - / - - / 10.420 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Fiscal Year (FY) 2027 Base procurement funds in the amount of $10.420 million will support the production engineering and fielding requirements for Location and Azimuth Determination Systems (LADS) and integrate to the latest software compliance initiatives. LADS provides a lightweight, portable, and deployable common inertial survey capability for field artillery cannon, rocket, missile, radar and mortar platforms that is not dependent on the Global Positioning System (GPS). The system also provides accurate location, azimuth, and direction for all field artillery systems while being reliable, intuitive to use, and more cost effective than the predecessor. It operates effectively in GPS-denied and GPS-degraded environments. The updated software integration initiatives support enhanced security and ensure compliance with Public Law (P.L.) 111-383 for the GPS. Net funding increase from FY 2026 to FY 2027 reflects the procurement of hardware required for implementation of the enhanced software compliance initiatives required to ensure the continued ability to conduct precision and near precision fires in a GPS contested environment while maintaining current operational tempo. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 6659G08100 - LOCATION & AZIMUTH DETERMINATION SYSTEM ... Army UNCLASSIFIED Page 2 of 4 P-1 Line #20 Volume 1 - 130 === page 161 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6659G08100 / LOCATION & AZIMUTH DETERMINATION SYSTEM (LADS) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: G08112 / LOCATION & AZIMUTH DETERMINATION SYSTEM MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC 126 FY 2025 - FY 2026 - - - FY 2027 Total - 48.902 2.543 9.477 10.420 - 10.420 - - - - - - 48.902 2.543 9.477 10.420 - 10.420 - - - - - - 48.902 2.543 9.477 10.420 - 10.420 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) 388.111 - - - - - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Hardware 126 33.534 - - - - - - - 1.453 - - - - - - - - - - - - - 34.987 - - - - - 34.987 - - - New Equipment Fielding & Training - - 0.958 - - Subtotal: Recurring Cost - - 0.958 - Technical Manual & Publication - - 1.165 Subtotal: Non Recurring Cost - - Subtotal: Package Fielding Cost - Assembly & Integration M-Code Subtotal: Recurring Cost Subtotal: Hardware Cost 266.143 - - - - - - - - - - - - - 8.411 - - - 8.411 - - 8.411 2.543 - - - 2.543 - - - - 1.165 - - - 2.123 - 25 9.305 - - - - - - - - - - - 9.603 - - - - - 9.603 - - 9.603 - - - - - 9.603 - - 9.603 - - - - - 9.603 1.066 - - 0.817 - - - - - 0.817 - 1.066 - - 0.817 - - - - - 0.817 - - - - - - - - - - - - - - - - - - - - - - - - - - 2.543 - - 1.066 - - 0.817 - - - - - 0.817 - - - - - - - - - - - - - - Package Fielding Cost Recurring Cost Non Recurring Cost Support - Initial Spares and Repair Parts Cost Initial Spares and Repair Parts 372.200 LI 6659G08100 - LOCATION & AZIMUTH DETERMINATION SYSTEM ... Army UNCLASSIFIED Page 3 of 4 P-1 Line #20 Volume 1 - 131 === page 162 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6659G08100 / LOCATION & AZIMUTH DETERMINATION SYSTEM (LADS) Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: G08112 / LOCATION & AZIMUTH DETERMINATION SYSTEM MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) Subtotal: Support - Initial Spares and Repair Parts Cost FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - 9.305 - - - - - - - - - - - - - - - Production Engineering - - 1.989 - - - - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - 1.989 - - - - - - - - - - - - - - - System Engineering - - 0.498 - - - - - - - - - - - - - - - Subtotal: Support - System Engineering Cost - - 0.498 - - - - - - - - - - - - - - - 126 48.902 - - 2.543 - - 9.477 - - 10.420 - - - - - 10.420 Support - Production Engineering Cost Support - System Engineering Cost Gross/Weapon System Cost 388.111 Remarks: Net funding increase from FY 2026 to FY 2027 reflects the procurement of hardware required for implementation of the enhanced software compliance initiatives required to ensure continued ability to conduct precision and near precision fires in a GPS contested environment while maintaining current operational tempo. Secondary Distribution Army Quantity Total: Secondary Distribution FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total - - - - - 2.543 9.477 10.419 - 10.419 Quantity - - - - - Total Obligation Authority - - 0.001 - 0.001 Total Obligation Authority ANG FY 2025 Quantity Total Obligation Authority LI 6659G08100 - LOCATION & AZIMUTH DETERMINATION SYSTEM ... Army - - - - - 2.543 9.477 10.420 - 10.420 UNCLASSIFIED Page 4 of 4 P-1 Line #20 Volume 1 - 132 === page 163 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 8181G01501 / XM320 Grenade Launcher Module (GLM) Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 10: Weapons & Other Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 307.972 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 20.925 6.000 - - - - - - - - - - - - - - - - - - 20.925 6.000 - - - - - - - - - - - - - - - - - - 20.925 6.000 - - - - - - - - 307.972 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2026 - Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2025 307.972 To FY 2031 Complete Total 334.897 334.897 334.897 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: This program supports the Army Modernization priorities (Build a More Lethal Force) through enhancement of Joint Lethality in contested environments by minimizing and eliminating erosion of close combat capability relative to peer competitors in complex terrain. The M320 Grenade Launcher Module (GLM) is a 40mm low-velocity grenade launching weapon system that is a direct replacement to all M203 series of grenade launchers on M16 Rifles and M4 Carbines. The M320 Grenade Launcher Module (GLM) is a modular system that mounts under the barrel of the rifle or carbine. This weapon can also be used in the stand-alone configuration. The M320 Grenade Launcher Module (GLM) has an integrated leaf sight and some improved safety features. This weapon also has a side-loading unrestricted breech that permits the firing of longer 40mm low-velocity projectiles (NATO standard and non-standard). The M320 Grenade Launcher Module (GLM) is more reliable and safer because of the use of a more modern double-action trigger/firing system. The new pistol grip design eliminates the need to use the M4 magazine as a hand grip. The latest innovations in lightweight material composites improve durability. Procurement of handheld Laser Range Finder (LRF) and Grenadier Sighting System (GSS) are delivered as system components, one each per system. M320 Grenade Launcher Modules (GLMs) will also be fitted with an additional system components, such as a leaf sight, barrel, improved butt stock, and a XM100 40mm fuze programmer, to support the High Explosive Air Burst (HEAB) and M433E1 capability to be delivered by the new 40mm Family of Ammunition (FOA). Secondary Distribution Army FY 2025 Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 20.925 6.000 - - - - - - - - - - - - - - - - 20.925 6.000 - - - - - - - Justification: There is no Fiscal Year 2027 budget request for this funding line. LI 8181G01501 - XM320 Grenade Launcher Module (GLM) Army UNCLASSIFIED Page 1 of 1 P-1 Line #21 Volume 1 - 133 === page 164 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 8190G01506 / Precision Sniper Rifle Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 10: Weapons & Other Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 452 219 - - - - - - - - - 671 38.066 5.910 1.853 - - - - - - - - 45.829 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Total - - - - - - - - - - - - 38.066 5.910 1.853 - - - - - - - - 45.829 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) To FY 2031 Complete - - - - - - - - - - - - 38.066 5.910 1.853 - - - - - - - - 45.829 - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - 84.217 26.986 - - - - - - - - - 68.300 Gross/Weapon System Unit Cost ($ in Thousands) Description: The Precision Sniper Rifle (PSR) program supports the Army Modernization priorities (Build a More Lethal Force) through enhancement of Joint Lethality in contested environments by minimizing and eliminating erosion of close combat capability relative to peer competitors in complex terrain. Precision Sniper Rifle (PSR) will become the primary anti-personnel Sniper Weapon System (SWS) in all Army Sniper Teams. On 31 March 2021, the U.S. Army awarded contract W15QKN-21-D-0028 to Barrett Firearms MFG, Inc. The contract is a 5-year Firm Fixed Price (FFP) Indefinite Delivery/Indefinite Quantity (IDIQ) contract for production and delivery of the MK22 Precision Sniper Rifle (Multi-role Adaptive Design (MRAD) commercial variant) to support an Army Acquisition Objective (AAO) of 2,800 systems. It is a Non-Developmental Item (NDI) that is a multi-caliber, bolt-action sniper rifle, which is effective against personnel and materiel targets at extreme ranges. The Precision Sniper Rifle (PSR) provides increased probability of hit over the current M2010 Enhanced Sniper Rifle (ESR) configuration at distances beyond twelve-hundred (1200) meters, which enhances the sniper role in supporting combat operations and improves sniper survivability. The Precision Sniper Rifle (PSR) provides extended effective range by three-hundred (300) meters over M2010 Enhanced Sniper Rifle (ESR) out to fifteen-hundred (1500) meters, which increases stand-off distances ensuring overmatch against enemy counter sniper engagements and increases sniper capabilities. The Precision Sniper Rifle (PSR) also replaces the anti-materiel M107 semi-automatic .50 caliber sniper rifle, offering improved accuracy in a lighter weight package. The Precision Sniper Rifle (PSR) includes a sound suppressor and direct view optic with fire control capabilities. This allows snipers, when supplemented with a clip-on image intensifier or thermal sensor system, to effectively engage enemy snipers, as well as crew served and indirect fire weapons virtually undetected in any light condition. Secondary Distribution Army FY 2025 Quantity Total Obligation Authority ANG Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 127 - - - - - - - - 2.428 1.853 - - - - - - - 92 - - - - - - - - 3.482 - - - - - - - - 219 - - - - - - - - 5.910 1.853 - - - - - - - Justification: There is no Fiscal Year 2027 budget request for this funding line. LI 8190G01506 - Precision Sniper Rifle Army UNCLASSIFIED Page 1 of 2 P-1 Line #22 Volume 1 - 134 === page 165 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 10: Weapons & Other Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8190G01506 / Precision Sniper Rifle Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 8190G01506 - Precision Sniper Rifle Army UNCLASSIFIED Page 2 of 2 P-1 Line #22 Volume 1 - 135 === page 166 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 8201G13501 / Carbine Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 10: Weapons & Other Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 293.789 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 8.003 - - - - - - - - - 293.789 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2026 - Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2025 - - - - - - - - - - 8.003 - - - - - - - - - - - - - - - - - - - 8.003 - - - - - - - - - 293.789 To FY 2031 Complete Total 301.792 301.792 301.792 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: This funding line is used to procure M4A1 Carbines for the Army and 30 round Enhanced Performance Magazine (EPM). The M4A1 Carbines are 5.56mm, gas operated, air-cooled weapons designed for lightness, speed, mobility and firepower. The M4A1 Carbine is a more compact weapon than the M16 rifle series since it uses a shorter barrel and collapsible stock. When compared to the M4 Carbine, the M4A1 Carbine has a (safe/semi-automatic/full automatic) trigger group, with a heavier barrel thickness to support increased sustained rates of fire, and an ambidextrous fire control selector. The M4A1 Carbine also includes a back-up iron sight and the adapter rail system to attach accessories and components. Secondary Distribution Army FY 2025 Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 8.003 - - - - - - - - - - - - - - - - - 8.003 - - - - - - - - Justification: There is no Fiscal Year 2027 budget request for this funding line. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 8201G13501 - Carbine Army UNCLASSIFIED Page 1 of 1 P-1 Line #23 Volume 1 - 136 === page 167 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 10: Weapons & Other Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Procurement Quantity (Units in Each) 50,223 41,975 36,297 38,141 - 38,141 37,942 36,687 36,281 36,028 Continuing Gross/Weapon System Cost ($ in Millions) 594.971 394.720 358.907 372.641 - 372.641 372.619 365.598 365.488 369.398 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 594.971 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) - - 394.720 - 358.907 - 594.971 372.641 - 394.720 - - 358.907 372.641 - 372.641 - - 372.641 - - 372.619 - 365.598 - 365.488 - 372.619 369.398 - 365.598 Continuing - 369.398 Continuing - Continuing - 365.488 Total Continuing Continuing - - Continuing Continuing - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - 11.847 9.404 9.888 9.770 - 9.770 9.821 9.965 10.074 Gross/Weapon System Unit Cost ($ in Thousands) 10.253 Continuing Continuing Description: This funding line is directly aligned to the Army Soldier Lethality Modernization Priority. Next Generation Squad Weapons (NGSW) is a family of products that includes the XM8 Carbine, M7 Rifle and M250 Automatic Rifle that integrate with advanced Fire Control and family of 6.8mm ammunition. The XM8 Carbine, M7 Rifle and M250 Automatic Rifle are the planned replacements for the M4 Carbine and M249 Squad Automatic Weapon for individual soldiers, squads, and/or platoons, capable of defeating protected and unprotected threats. The XM8 Carbine, M7 Rifle and M250 Automatic Rifle ensure increased lethality against a broad spectrum of targets beyond current/legacy weapon capabilities; increased range, accuracy, and probability of hit; reduced engagement time; suppressed flash/sound signature; and improved controllability and mobility. The XM8 Carbine is a lightweight, short-barrel variant of the M7 Rifle. The Fire Control is an advanced individual fire control device along with optics, sights, lasers, and other enablers that supports the XM8 Carbine, M7 Rifle, M250 Automatic Rifle and other individual squad weapon systems. The Fire Control increases the probability of hit and decreases engagement time through a variable-powered direct view optic with integrated range finder, ballistic calculator, and digital display capable of providing an adjusted aim point. The Fire Control utilizes open architecture to deliver to an initial augmented core capability followed by increasing increments of capability over time as technology matures and evolves. Secondary Distribution Army ANG AR Total: FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 Quantity 30,558 26,203 16,132 - 16,132 13,824 10,700 16,289 36,028 Total Obligation Authority 278.924 258.495 159.166 - 159.166 135.163 62.669 140.508 369.398 Quantity 11,409 10,094 22,009 - 22,009 24,118 25,987 19,992 - Total Obligation Authority 115.790 100.412 213.475 - 213.475 237.456 302.929 224.980 - Quantity 8 - - - - - - - Total Obligation Authority 0.006 - - - - - - - - Quantity 41,975 36,297 38,141 - 38,141 37,942 36,687 36,281 36,028 LI 8205G14510 - Next Generation Squad Weapon Army UNCLASSIFIED Page 1 of 27 P-1 Line #24 - Volume 1 - 137 === page 168 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 10: Weapons & Other Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Secondary Distribution Secondary Distribution FY 2025 Total Obligation Authority LI 8205G14510 - Next Generation Squad Weapon Army 394.720 FY 2026 358.907 FY 2027 Base FY 2027 OOC 372.641 UNCLASSIFIED Page 2 of 27 FY 2027 Total - FY 2028 372.641 372.619 P-1 Line #24 FY 2029 365.598 FY 2030 FY 2031 365.488 369.398 Volume 1 - 138 === page 169 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 10: Weapons & Other Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 G14511 / Next Generation Squad Weapon-Automatic Rifle P-5a, P-21 A 3,131 / 41.233 1,772 / 23.133 2,037 / 26.476 2,795 / 33.681 - / - 2,795 / 33.681 P-5 G14512 / NEXT GENERATION SQUAD WEAPON-RIFLE P-5a, P-21 A 24,531 / 140.024 19,858 / 118.875 14,736 / 82.247 14,944 / 83.004 - / - 14,944 / 83.004 P-5 G14513 / Next Generation Squad Weapon - Fire Control P-5a, P-21 A 22,561 / 413.714 20,345 / 252.712 19,524 / 250.184 20,402 / 255.956 - / - 20,402 / 255.956 P-40 Total Gross/Weapon System Cost 50,223 / 594.971 41,975 / 394.720 36,297 / 358.907 38,141 / 372.641 - / - 38,141 / 372.641 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Base procurement dollars in the amount of $372.641 million supports the following: FY 2027 Base procurement dollars in the amount of $33.681 million supports the procurement and fielding of 2,795 M250 Automatic Rifles, which are the planned replacement for the M249 Squad Automatic Weapon (SAW) within the Close Combat Force. FY 2027 Base procurement dollars in the amount of $83.004 million supports the procurement and fielding of 14,944 XM8 Carbines which are the planned replacement for the M4A1 Carbine within the Close Combat Force. The XM8 Carbine is a lightweight, short-barrel variant of the M7 Rifle. The XM8 Carbine, M7 Rifle and M250 Automatic Rifle ensure increased lethality against a broad spectrum of targets beyond current/legacy weapons capabilities; increased range, accuracy, and probability of hit; reduced engagement time; suppressed flash/sound signature; and improved controllability and mobility. FY 2027 Base procurement dollars in the amount of $255.956 million supports the procurement and fielding of 20,402 advanced Fire Control systems. The advanced Fire Control has both close quarter and extended range capabilities, increasing the range, accuracy and probability of hit of the XM8 Carbine, M7 Rifle and M250 Automatic Rifle. The XM8 Carbine, M7 Rifle, M250 Automatic Rifle, advanced Fire Control, and 6.8mm Common Cartridge are fielded concurrently to provide a squad level capability improvement to maintain overmatch against near peer enemy threats. Funding on this line also supports the procurement and fielding of optics, sights, lasers, and other enablers for the XM8 Carbine, M7 Rifle and M250 Automatic Rifle, in addition to the advanced Fire Control. Increase in budget request from FY 2026 to FY 2027 maintains steady production rates for both vendors and supports Army fielding plans into FY 2028. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. Army Acquisition Objectives (AAOs): XM8 Carbines: TBD M7 Rifle (NGSW-R): 111,428 M250 Automatic Rifle (NGSW-AR): 13,334 Advanced Fire Control (NGSW-FC): 124,749 LI 8205G14510 - Next Generation Squad Weapon Army UNCLASSIFIED Page 3 of 27 P-1 Line #24 Volume 1 - 139 === page 170 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 10: Weapons & Other Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A LI 8205G14510 - Next Generation Squad Weapon Army UNCLASSIFIED Page 4 of 27 P-1 Line #24 Volume 1 - 140 === page 171 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: G14511 / Next Generation Squad Weapon-Automatic Rifle MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) 3,131 1,772 2,037 2,795 - 2,795 Gross/Weapon System Cost ($ in Millions) 41.233 23.133 26.476 33.681 - 33.681 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) - - - - - - 41.233 23.133 26.476 33.681 - 33.681 - - - - - - 41.233 23.133 26.476 33.681 - 33.681 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - 13.169 13.055 12.998 12.050 - 12.050 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost Transportation - - 0.115 - - 0.244 - - 0.235 - - 0.200 - - - - - 0.200 XM250 Integration Efforts - - - - - 0.240 - - 0.245 - - 0.150 - - - - - 0.150 Engineering Change Proposal - - 0.085 - - 0.180 - - 0.195 - - 0.190 - - - - - 0.190 Subtotal: Recurring Cost - - 0.200 - - 0.664 - - 0.675 - - 0.540 - - - - - 0.540 NGSW First Article Test - - 0.338 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 0.338 - - - - - - - - - - - - - - - - - 0.538 - - 0.664 - - 0.675 - - 0.540 - - - - - 0.540 11.075 3,382 37.456 11.389 1,772 20.181 10.773 2,037 21.945 10.523 2,795 29.412 - - - 10.523 2,795 29.412 Initial Spares - - 0.572 - - 0.500 - - 0.505 - - 0.470 - - - - - 0.470 Arms Room racks - - - - - - - - - - - 0.100 - - - - - 0.100 Subtotal: Recurring Cost - - 38.028 - - 20.681 - - 22.450 - - 29.982 - - - - - 29.982 - - 38.028 - - 20.681 - - 22.450 - - 29.982 - - - - - 29.982 Non Recurring Cost Subtotal: Flyaway Cost Hardware Cost Recurring Cost Next Generation Squad Weapon - (†) Automatic Rifle Subtotal: Hardware Cost LI 8205G14510 - Next Generation Squad Weapon Army UNCLASSIFIED Page 5 of 27 P-1 Line #24 Volume 1 - 141 === page 172 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: G14511 / Next Generation Squad Weapon-Automatic Rifle MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Package Fielding Cost Recurring Cost Total Package Fielding - - 0.456 - - 0.200 - - 0.800 - - 0.800 - - - - - 0.800 Subtotal: Recurring Cost - - 0.456 - - 0.200 - - 0.800 - - 0.800 - - - - - 0.800 Subtotal: Package Fielding Cost - - 0.456 - - 0.200 - - 0.800 - - 0.800 - - - - - 0.800 Integrated Logistic Support - - 0.163 - - 0.200 - - 0.210 - - 0.180 - - - - - 0.180 Subtotal: Recurring Cost - - 0.163 - - 0.200 - - 0.210 - - 0.180 - - - - - 0.180 - - 0.163 - - 0.200 - - 0.210 - - 0.180 - - - - - 0.180 Technical Publications - - 0.303 - - 0.035 - - 0.080 - - - - - - - - - Subtotal: Support - Data Cost - - 0.303 - - 0.035 - - 0.080 - - - - - - - - - - - 0.313 - - 0.270 - - 0.805 - - 0.805 - - - - - 0.805 - - 0.313 - - 0.270 - - 0.805 - - 0.805 - - - - - 0.805 - - 0.561 - - 0.250 - - 0.611 - - 0.534 - - - - - 0.534 - - 0.561 - - 0.250 - - 0.611 - - 0.534 - - - - - 0.534 Logistics Cost Recurring Cost Subtotal: Logistics Cost Support - Data Cost Support - New Equipment Training (NET) Cost Equipment Subtotal: Support - New Equipment Training (NET) Cost Support - Program Management Cost Government Management Subtotal: Support - Program Management Cost Support - System Engineering Cost System Engineering - - 0.872 - - 0.833 - - 0.845 - - 0.840 - - - - - 0.840 Subtotal: Support - System Engineering Cost - - 0.872 - - 0.833 - - 0.845 - - 0.840 - - - - - 0.840 Gross/Weapon System Cost 13.169 3,131 41.233 13.055 1,772 23.133 12.998 2,037 26.476 12.050 2,795 33.681 - - - 12.050 2,795 33.681 Remarks: Unit costs for the M250 Automatic Rifle are firm fixed price contract costs for all years. Ordering periods and are procured in different quantity ranges and ordering periods. Increases and decreases from FY 2026 to FY 2027 support cost elements based on revised budget estimates and remain consistent with actual costs in prior years. LI 8205G14510 - Next Generation Squad Weapon Army UNCLASSIFIED Page 6 of 27 P-1 Line #24 Volume 1 - 142 === page 173 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 10 P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon ID Code (A=Service Ready, B=Not Service Ready) : A Secondary Distribution Army ANG FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total 1,062 1,426 1,961 - 1,961 Total Obligation Authority 16.133 18.533 23.630 - 23.630 Total Obligation Authority (†) MDAP/MAIS Code: Quantity Quantity Total: Secondary Distribution Item Number / Title [DODIC]: G14511 / Next Generation Squad Weapon-Automatic Rifle 710 611 834 - 834 7.000 7.943 10.051 - 10.051 Quantity 1,772 2,037 2,795 - 2,795 Total Obligation Authority 23.133 26.476 33.681 - 33.681 indicates the presence of a P-5a LI 8205G14510 - Next Generation Squad Weapon Army UNCLASSIFIED Page 7 of 27 P-1 Line #24 Volume 1 - 143 === page 174 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 10 Cost Elements Next Generation Squad Weapon Automatic Rifle (†) Next Generation Squad Weapon Automatic Rifle (†) Next Generation Squad Weapon Automatic Rifle (†) (†) O O C P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: G14511 / Next Generation Squad Weapon-Automatic Rifle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($ K) FY Contractor and Location 2025 SIG Sauer Inc / Newington NH 03801-6801 C / FFP ACC-NJ, Picatinny Arsenal, NJ Apr 2025 Oct 2025 1,772 11.389 Y 2026 SIG Sauer Inc / Newington NH 03801-6801 C / FFP ACC-NJ, Picatinny Arsenal, NJ Apr 2026 Oct 2026 2,037 10.773 Y 2027 SIG Sauer Inc / Newington NH 03801-6801 C / FFP ACC-NJ, Picatinny Arsenal, NJ Jan 2027 Jul 2027 2,795 10.523 Y (Each) RFP Issue Date indicates the presence of a P-21 Remarks: Unit costs for the M250 Automatic Rifle are firm fixed price contract costs for all years and ordering periods and are procured in different quantity ranges and ordering periods. . LI 8205G14510 - Next Generation Squad Weapon Army UNCLASSIFIED Page 8 of 27 P-1 Line #24 Volume 1 - 144 === page 175 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: G14511 / Next Generation Squad Weapon-Automatic Rifle Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R 148 148 148 148 148 148 A P R M A Y J U N J U L A U G S E P 148 148 148 148 148 144 - - - - - Next Generation Squad Weapon - Automatic Rifle Prior Years Deliveries: 3382 1 2025 ARMY 1,772 0 1,772 1 2026 ARMY 2,037 0 2,037 1 2027 ARMY 2,795 0 2,795 A - - - - - - A - 0 2,037 2,795 O C T N O V D E C LI 8205G14510 - Next Generation Squad Weapon Army J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 27 S E P O C T N O V D E C J A N F E B P-1 Line #24 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 145 === page 176 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: G14511 / Next Generation Squad Weapon-Automatic Rifle Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T 167 170 170 170 170 170 170 170 170 170 170 170 - - - - - 50 50 50 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Next Generation Squad Weapon - Automatic Rifle Prior Years Deliveries: 3382 1 2025 ARMY 1,772 1,772 0 1 2026 ARMY 2,037 0 2,037 1 2027 ARMY 2,795 0 2,795 0 A O C T N O V D E C LI 8205G14510 - Next Generation Squad Weapon Army J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 27 S E P 0 293 294 294 294 294 294 294 294 294 O C T N O V D E C J A N F E B M A R A P R M A Y J U N P-1 Line #24 0 J U L A U G S E P Volume 1 - 146 === page 177 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 10 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: G14511 / Next Generation Squad Weapon-Automatic Rifle Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 SIG Sauer Inc - Newington NH 03801-6801 MSR For 2027 1-8-5 For 2027 MAX For 2027 20 294 1,235 ALT Prior to Oct 1 ALT After Oct 1 4 Reorder Manufacturing PLT 2 6 Total After Oct 1 ALT Prior to Oct 1 8 ALT After Oct 1 1 Manufacturing PLT 2 Total After Oct 1 6 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 8205G14510 - Next Generation Squad Weapon Army UNCLASSIFIED Page 11 of 27 P-1 Line #24 Volume 1 - 147 8 === page 178 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: G14512 / NEXT GENERATION SQUAD WEAPON-RIFLE MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) 24,531 19,858 14,736 14,944 - 14,944 Gross/Weapon System Cost ($ in Millions) 140.024 118.875 82.247 83.004 - 83.004 - - - - 82.247 83.004 - 83.004 - - - - 82.247 83.004 - 83.004 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) - 140.024 Plus CY Advance Procurement ($ in Millions) 118.875 - Total Obligation Authority ($ in Millions) - 140.024 118.875 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - 5.708 5.986 5.581 5.554 - 5.554 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost Transportation - - 0.370 - - 0.448 - - 0.430 - - 0.435 - - - - - 0.435 - - 0.370 - - 0.448 - - 0.430 - - 0.435 - - - - - 0.435 NGSW First Article Test - - 0.324 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 0.324 - - - - - - - - - - - - - - - - - 0.694 - - 0.448 - - 0.430 - - 0.435 - - - - - 0.435 4.433 27,032 119.833 4.372 18,092 79.098 - - - - - - - - - - - - - - - - - - 4.789 14,736 70.571 4.762 14,944 71.163 - - - 4.762 14,944 71.163 Subtotal: Recurring Cost Non Recurring Cost Subtotal: Flyaway Cost Hardware Cost Recurring Cost Next Generation Squad Weapon - Rifle (†) (NGSW-R) Next Generation Squad Weapon Carbine (†) Initial Spares - - 5.389 - - 2.530 - - 1.485 - - 1.000 - - - - - 1.000 Next Generation Squad Weapon- Rifle (UKRN) 4.706 550 2.588 4.372 1,766 7.721 - - - - - - - - - - - - Arms Room Racks - - - - - - - - - - - 1.020 - - - - - 1.020 LI 8205G14510 - Next Generation Squad Weapon Army UNCLASSIFIED Page 12 of 27 P-1 Line #24 Volume 1 - 148 === page 179 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: G14512 / NEXT GENERATION SQUAD WEAPON-RIFLE MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Subtotal: Recurring Cost Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) - - 127.810 M157 Taiwan IND3 (see remark) - - Subtotal: Non Recurring Cost - - - - 127.810 FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - 89.349 - - 72.056 - - 73.183 - - - - - 73.183 - - - 19.588 - - - - - - - - - - - - - - - 19.588 - - - - - - - - - - - - - - 108.937 - - 72.056 - - 73.183 - - - - - 73.183 Non Recurring Cost Subtotal: Hardware Cost Package Fielding Cost Recurring Cost Total Fielding Package - - 0.660 - - 1.000 - - 0.955 - - 0.960 - - - - - 0.960 Subtotal: Recurring Cost - - 0.660 - - 1.000 - - 0.955 - - 0.960 - - - - - 0.960 Subtotal: Package Fielding Cost - - 0.660 - - 1.000 - - 0.955 - - 0.960 - - - - - 0.960 Integrated Logistic Support - - 1.154 - - 0.456 - - 0.435 - - 0.450 - - - - - 0.450 Subtotal: Recurring Cost - - 1.154 - - 0.456 - - 0.435 - - 0.450 - - - - - 0.450 - - 1.154 - - 0.456 - - 0.435 - - 0.450 - - - - - 0.450 Integration projects - - 0.616 - - 1.050 - - 1.450 - - 1.050 - - - - - 1.050 Subtotal: Recurring Cost - - 0.616 - - 1.050 - - 1.450 - - 1.050 - - - - - 1.050 - - 0.616 - - 1.050 - - 1.450 - - 1.050 - - - - - 1.050 Technical Publications - - 0.494 - - 0.250 - - 0.235 - - 0.220 - - - - - 0.220 Subtotal: Support - Data Cost - - 0.494 - - 0.250 - - 0.235 - - 0.220 - - - - - 0.220 - - 0.250 - - 1.800 - - 1.706 - - 1.611 - - - - - 1.611 - - 0.250 - - 1.800 - - 1.706 - - 1.611 - - - - - 1.611 - 0.664 - - 1.100 - - 1.200 - - 1.305 - - - - - 1.305 Logistics Cost Recurring Cost Subtotal: Logistics Cost Vehicles Cost Recurring Cost Subtotal: Vehicles Cost Support - Data Cost Support - Engineering Change Proposals Cost Engineering Change Proposals Subtotal: Support Engineering Change Proposals Cost Support - New Equipment Training (NET) Cost Equipment - LI 8205G14510 - Next Generation Squad Weapon Army UNCLASSIFIED Page 13 of 27 P-1 Line #24 Volume 1 - 149 === page 180 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: G14512 / NEXT GENERATION SQUAD WEAPON-RIFLE MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) Subtotal: Support - New Equipment Training (NET) Cost FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - 0.664 - - 1.100 - - 1.200 - - 1.305 - - - - - 1.305 - - 4.503 - - 2.634 - - 2.590 - - 2.595 - - - - - 2.595 - - 4.503 - - 2.634 - - 2.590 - - 2.595 - - - - - 2.595 Support - Program Management Cost Government Management Subtotal: Support - Program Management Cost Support - System Engineering Cost System Engineering - - 3.179 - - 1.200 - - 1.190 - - 1.195 - - - - - 1.195 Subtotal: Support - System Engineering Cost - - 3.179 - - 1.200 - - 1.190 - - 1.195 - - - - - 1.195 Gross/Weapon System Cost 5.708 24,531 140.024 5.986 19,858 118.875 5.581 14,736 82.247 5.554 14,944 83.004 - - - 5.554 14,944 83.004 Remarks: The XM8 NGSW Carbine is a lighter-weight, short-barrel variant of the same weapon procured on this line previously (the M7 NGSW Rifle). Unit costs are firm fixed price contract costs for all years and ordering periods and are procured in different quantity ranges and ordering periods. Increases and decreases from FY 2026 to FY 2027 on support cost elements are based on revised budget estimates and remain consistent with actual costs in prior years. New cost element "Arms Room Racks" includes the cost of new weapon storage components and associated items for fielding to units with the M7 Rifle. Cost element "M157 Taiwan IND3" represents FY 2025 funding in support of Taiwan Tranche 3 (FY25-42IR), for the procurement of M157 Next Generation Squad Weapon Fire Control Optics. These funds were allocated to G14512 (M7 Rifle) in error, the correct allocation is G14513 (M157 Fire Control). Secondary Distribution Army ANG Total: Secondary Distribution FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total Quantity 16,523 10,720 5,992 - 5,992 Total Obligation Authority 101.978 59.828 33.282 - 33.282 Quantity 3,335 4,016 8,952 - 8,952 Total Obligation Authority 16.897 22.419 49.722 - 49.722 Quantity 19,858 14,736 14,944 - 14,944 Total Obligation Authority 118.875 82.247 83.004 - 83.004 LI 8205G14510 - Next Generation Squad Weapon Army UNCLASSIFIED Page 14 of 27 P-1 Line #24 Volume 1 - 150 === page 181 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 10 P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon ID Code (A=Service Ready, B=Not Service Ready) : A (†) Item Number / Title [DODIC]: G14512 / NEXT GENERATION SQUAD WEAPON-RIFLE MDAP/MAIS Code: indicates the presence of a P-5a LI 8205G14510 - Next Generation Squad Weapon Army UNCLASSIFIED Page 15 of 27 P-1 Line #24 Volume 1 - 151 === page 182 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 10 Cost Elements Next Generation Squad Weapon Rifle (NGSW-R) Next Generation Squad Weapon (†) Carbine Next Generation Squad Weapon (†) Carbine (†) O O C P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: G14512 / NEXT GENERATION SQUAD WEAPON-RIFLE Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($ K) FY Contractor and Location 2025 SIG Sauer Inc / Newington NH 03801-6801 C / FFP ACC-NJ, Picatinny Arsenal, NJ Mar 2025 Jul 2025 18,092 4.372 Y 2026 SIG Sauer Inc / Newington NH 03801-6801 C / FFP ACC-NJ, Picatinny Arsenal, NJ Apr 2026 Oct 2026 14,736 4.789 Y 2027 SIG Sauer Inc / Newington NH 03801-6801 C / FFP ACC-NJ, Picatinny Arsenal, NJ Jan 2027 Jul 2027 14,944 4.762 Y (Each) RFP Issue Date indicates the presence of a P-21 Remarks: Unit costs are firm fixed price contract for all years and ordering periods and are procured in different quantity ranges and ordering periods. LI 8205G14510 - Next Generation Squad Weapon Army UNCLASSIFIED Page 16 of 27 P-1 Line #24 Volume 1 - 152 === page 183 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 10 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: G14512 / NEXT GENERATION SQUAD WEAPON-RIFLE Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Next Generation Squad Weapon - Carbine 1 2026 ARMY 14.736 .000 14.736 1 2027 ARMY 14.944 .000 14.944 A - - - - - - 14.736 14.944 O C T N O V D E C LI 8205G14510 - Next Generation Squad Weapon Army J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 27 S E P O C T N O V D E C J A N F E B P-1 Line #24 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 153 === page 184 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 10 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: G14512 / NEXT GENERATION SQUAD WEAPON-RIFLE Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N 1.403 1.403 1.403 1.403 1.403 1.403 1.403 1.403 A - - - - - Calendar Year 2028 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N 1.403 1.054 .703 .352 - .356 .713 1.068 1.423 1.423 1.423 1.423 1.423 1.423 1.423 1.423 1.423 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Next Generation Squad Weapon - Carbine 1 2026 ARMY 14.736 .000 14.736 1 2027 ARMY 14.944 .000 14.944 O C T N O V D E C LI 8205G14510 - Next Generation Squad Weapon Army J A N F E B M A R A P R M A Y J U N UNCLASSIFIED Page 18 of 27 .000 P-1 Line #24 .000 J U L A U G S E P Volume 1 - 154 === page 185 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 10 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: G14512 / NEXT GENERATION SQUAD WEAPON-RIFLE Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 SIG Sauer Inc - Newington NH 03801-6801 MSR For 2027 1-8-5 For 2027 MAX For 2027 150 1,423 5,975 ALT Prior to Oct 1 ALT After Oct 1 4 Reorder Manufacturing PLT 2 6 Total After Oct 1 ALT Prior to Oct 1 8 ALT After Oct 1 1 Manufacturing PLT 3 Total After Oct 1 6 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 8205G14510 - Next Generation Squad Weapon Army UNCLASSIFIED Page 19 of 27 P-1 Line #24 Volume 1 - 155 9 === page 186 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: G14513 / Next Generation Squad Weapon - Fire Control MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) 22,561 20,345 19,524 20,402 - 20,402 Gross/Weapon System Cost ($ in Millions) 413.714 252.712 250.184 255.956 - 255.956 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) - 413.714 Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) - 252.712 - 413.714 - 250.184 - 252.712 - 255.956 - 250.184 - - 255.956 - 255.956 - - 255.956 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - 18.338 12.421 12.814 12.546 - 12.546 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost Transportation - - 0.110 - - 0.100 - - 0.125 - - 0.125 - - - - - 0.125 - - 0.110 - - 0.100 - - 0.125 - - 0.125 - - - - - 0.125 - - 0.110 - - 0.100 - - 0.125 - - 0.125 - - - - - 0.125 12.038 30,269 364.378 11.077 20,345 225.362 11.255 19,524 219.743 11.563 20,402 235.908 - - - 11.563 20,402 235.908 Initial Spares - - 6.226 - - 0.770 - - - - - - - - - - - - Engineering Data - - 0.746 - - 0.368 - - 0.305 - - 0.300 - - - - - 0.300 Technical Publications - - 0.815 - - 0.450 - - 0.420 - - 0.430 - - - - - 0.430 Engineering Change Proposals - - 0.930 - - - - - - - - - - - - - - - Optics and Enablers - - - - - 13.274 - - 16.656 - - 6.293 - - - - - 6.293 Subtotal: Recurring Cost - - 373.095 - - 240.224 - - 237.124 - - 242.931 - - - - - 242.931 First Article Testing - - 10.619 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 10.619 - - - - - - - - - - - - - - - - - 383.714 - - - - - - - - - - - Subtotal: Recurring Cost Subtotal: Flyaway Cost Hardware Cost Recurring Cost NGSW Fire Control Systems (†) Non Recurring Cost Subtotal: Hardware Cost 240.224 237.124 242.931 242.931 Package Fielding Cost LI 8205G14510 - Next Generation Squad Weapon Army UNCLASSIFIED Page 20 of 27 P-1 Line #24 Volume 1 - 156 === page 187 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: G14513 / Next Generation Squad Weapon - Fire Control MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Recurring Cost Total Package Fielding - - 0.990 - - 0.490 - - 0.685 - - 0.690 - - - - - 0.690 Subtotal: Recurring Cost - - 0.990 - - 0.490 - - 0.685 - - 0.690 - - - - - 0.690 Subtotal: Package Fielding Cost - - 0.990 - - 0.490 - - 0.685 - - 0.690 - - - - - 0.690 Integrated Logistics Support (ILS) - - 1.112 - - 0.426 - - 0.575 - - 0.580 - - - - - 0.580 Subtotal: Recurring Cost - - 1.112 - - 0.426 - - 0.575 - - 0.580 - - - - - 0.580 - - 1.112 - - 0.426 - - 0.575 - - 0.580 - - - - - 0.580 - - 5.199 - - 4.018 - - 4.250 - - 4.265 - - - - - 4.265 - - 5.199 - - 4.018 - - 4.250 - - 4.265 - - - - - 4.265 - - 14.762 - - 3.744 - - 3.750 - - 3.765 - - - - - 3.765 - - 14.762 - - 3.744 - - 3.750 - - 3.765 - - - - - 3.765 System Engineering - - 6.458 - - 3.710 - - 3.675 - - 3.600 - - - - - 3.600 Subtotal: Support - System Engineering Cost - - 6.458 - - 3.710 - - 3.675 - - 3.600 - - - - - 3.600 Logistics Cost Recurring Cost Subtotal: Logistics Cost Support - New Equipment Training (NET) Cost Equipment Subtotal: Support - New Equipment Training (NET) Cost Support - Program Management Cost Government Management Subtotal: Support - Program Management Cost Support - System Engineering Cost Support - System Test and Evaluation Cost Test and Evaluation Support - - 1.360 - - - - - - - - - - - - - - - Subtotal: Support - System Test and Evaluation Cost - - 1.360 - - - - - - - - - - - - - - - Gross/Weapon System Cost 18.338 22,561 413.714 12.421 20,345 12.814 19,524 12.546 20,402 - - - 12.546 20,402 252.712 250.184 255.956 255.956 Remarks: Unit costs are firm fixed price contract for all years and ordering periods and are procured in different quantity ranges and ordering periods. Increases and decreases from FY 2026 to FY 2027 on support cost elements are based on revised budget estimates and remain consistent with actual costs in prior years. LI 8205G14510 - Next Generation Squad Weapon Army UNCLASSIFIED Page 21 of 27 P-1 Line #24 Volume 1 - 157 === page 188 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 10 P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: G14513 / Next Generation Squad Weapon - Fire Control MDAP/MAIS Code: Long production lead time due to electronic supply chain and U.S.-based precision glass manufacturing challenges. Significant increases/decreases projected between FY 2026 and FY 2027 are impacting mainly hardware costs due to the ongoing implementation of the new Army's alternate optic strategy. Secondary Distribution Army ANG AR (†) FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total Quantity 12,973 14,057 8,179 - 8,179 Total Obligation Authority 160.813 180.134 102.254 - 102.254 Quantity 7,364 5,467 12,223 - 12,223 Total Obligation Authority 91.893 70.050 153.702 - 153.702 Quantity Total: Secondary Distribution FY 2025 8 - - - Total Obligation Authority 0.006 - - - - Quantity 20,345 19,524 20,402 - 20,402 Total Obligation Authority 252.712 250.184 255.956 - 255.956 indicates the presence of a P-5a LI 8205G14510 - Next Generation Squad Weapon Army UNCLASSIFIED Page 22 of 27 P-1 Line #24 Volume 1 - 158 === page 189 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 10 O O C Cost Elements (†) NGSW Fire Control Systems (†) NGSW Fire Control Systems (†) NGSW Fire Control Systems (†) P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: G14513 / Next Generation Squad Weapon - Fire Control Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($ K) FY Contractor and Location 2025 Sheltered Wings DBA Vortex Optics / 1 Vortex Drive Barneveld, WI 53507 C / FFP ACC-NJ, Picatinny Arsenal, NJ Mar 2025 Jan 2027 20,345 11.077 N 2026 Sheltered Wings DBA Vortex Optics / 1 Vortex Drive Barneveld, WI 53507 C / FFP ACC-NJ, Picatinny Arsenal, NJ Apr 2026 Jan 2028 19,524 11.255 N 2027 Sheltered Wings DBA Vortex Optics / 1 Vortex Drive Barneveld, WI 53507 C / FFP ACC-NJ, Picatinny Arsenal, NJ Jan 2027 Nov 2028 20,402 11.563 N (Each) RFP Issue Date indicates the presence of a P-21 Remarks: Unit costs are firm fixed price contract for all years and ordering periods and are procured in different quantity ranges and ordering periods. Long production lead time due to electronic supply chain and U.S.-based precision glass manufacturing challenges. LI 8205G14510 - Next Generation Squad Weapon Army UNCLASSIFIED Page 23 of 27 P-1 Line #24 Volume 1 - 159 === page 190 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 10 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE Item Number / Title [DODIC]: G14513 / Next Generation Squad Weapon - Fire Control Fiscal Year 2025 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P NGSW Fire Control Systems Prior Years Deliveries: 30269 1 2025 ARMY 20.345 .000 20.345 1 2026 ARMY 19.524 .000 19.524 1 2027 ARMY 20.402 .000 20.402 A - - - - - - - - - - - - - - - - - - - 20.345 A - - - - - - 19.524 20.402 O C T N O V D E C LI 8205G14510 - Next Generation Squad Weapon Army J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 24 of 27 S E P O C T N O V D E C J A N F E B P-1 Line #24 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 160 === page 191 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 10 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE Item Number / Title [DODIC]: G14513 / Next Generation Squad Weapon - Fire Control J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.750 1.750 1.750 1.750 1.750 1.750 1.750 1.750 1.750 3.774 - 20.402 Fiscal Year 2027 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C NGSW Fire Control Systems Prior Years Deliveries: 30269 1 2025 ARMY 20.345 .000 20.345 - - - 1.695 1.695 1.695 1.695 1.695 1.695 1.695 1.695 1.695 1.695 1.695 1.700 1 2026 ARMY 19.524 .000 19.524 - - - - - - - - - - - - - - - 1 2027 ARMY 20.402 .000 20.402 A O C T N O V D E C LI 8205G14510 - Next Generation Squad Weapon Army J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 25 of 27 S E P O C T N O V .000 D E C J A N F E B P-1 Line #24 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 161 === page 192 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 10 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: G14513 / Next Generation Squad Weapon - Fire Control Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 O C T N O V D E C A U G S E P O C T 1.750 1.224 .800 - .552 1.000 1.885 1.885 1.885 1.885 1.885 1.885 1.885 1.885 1.885 1.885 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E NGSW Fire Control Systems Prior Years Deliveries: 30269 1 2025 ARMY 20.345 20.345 .000 1 2026 ARMY 19.524 15.750 3.774 1 2027 ARMY 20.402 .000 .000 20.402 O C T LI 8205G14510 - Next Generation Squad Weapon Army .000 UNCLASSIFIED Page 26 of 27 .000 N O V D E C J A N F E B P-1 Line #24 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 162 === page 193 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8205G14510 / Next Generation Squad Weapon Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 10 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: G14513 / Next Generation Squad Weapon - Fire Control Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Sheltered Wings DBA Vortex Optics - 1 Vortex Drive Barneveld, WI 53507 MSR For 2027 1-8-5 For 2027 MAX For 2027 150 1,885 7,925 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 9 11 Total After Oct 1 ALT Prior to Oct 1 20 ALT After Oct 1 1 Manufacturing PLT 4 Total After Oct 1 18 22 Remarks: Long production lead time due to electronic supply chain and U.S.-based precision glass manufacturing challenges. The 22-month lead time shown on the schedule is conservative. The vendor (Vortex Optics) has been consistently reducing production lead time and addressing challenges with their suppliers. The program office's expectation is that by FY 2027 lead time should be significantly less than 22 months. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 8205G14510 - Next Generation Squad Weapon Army UNCLASSIFIED Page 27 of 27 P-1 Line #24 Volume 1 - 163 === page 194 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 8310G04700 / Common Remotely Operated Weapons Station Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 10: Weapons & Other Combat Vehicles Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 2,351.911 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 2,351.911 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 2,351.911 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 0.747 3.000 - - - - - - - - - - - - - - - - - - 0.747 3.000 - - - - - - - - - - - - - - - - - - 0.747 3.000 - - - - - - - - Total 2,355.658 2,355.658 2,355.658 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: This program supports the Army Modernization priorities (Build a More Lethal Force) through enhancement of Joint Lethality in contested environments by minimizing and eliminating erosion of close combat capability relative to peer competitors in complex terrain. The M153 Common Remotely Operated Weapon Station (CROWS) is an integrated system that provides the capability to remotely operate all standard U.S. Army machine guns (i.e., M2 Heavy Barrel Machine Guns, MK-19 Grenade Machine Guns, M240B/L Medium Machine Guns and M249 Squad Automatic Weapons) and increase lethality solutions (to include Javelin) on a variety of vehicles from an Up-Armored High Mobility Multi-Purpose Wheeled Vehicle (HMMWV) to a M1A2 Main Battle Tank. The CROWS system includes a three axis stabilized mount, a sensor suite with fire control software, and a vehicle integration kit. CROWS permits the gunner to manipulate the sight and weapon from under armor using a hand controller and a flat panel display. Missions can be carried out under conditions of varying visibility via the day camera or thermal camera. The laser range finder and three-axis stabilization allows for accurate fire on the move. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 0.747 3.000 - - - - - - - - - - - - - - - - 0.747 3.000 - - - - - - - Justification: There is no FY 2027 budget request for this funding line. In accordance with Section 1815 of the FY 2008 National Defense Act, (P.L.110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 8310G04700 - Common Remotely Operated Weapons Station Army UNCLASSIFIED Page 1 of 1 P-1 Line #25 Volume 1 - 164 === page 195 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 8635G15325 / Handgun Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 10: Weapons & Other Combat Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - - 74.098 0.034 0.007 - - - - - - - - 74.139 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Total - - - - - - - - - - - - 74.098 0.034 0.007 - - - - - - - - 74.139 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) To FY 2031 Complete - - - - - - - - - - - - 74.098 0.034 0.007 - - - - - - - - 74.139 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Modular Handgun System (MHS) supports the Army Modernization priorities (Build a More Lethal Force) through enhancement of Joint Lethality in contested environments by minimizing and eliminating erosion of close combat capability relative to peer competitors in complex terrain. Currently, the M9 Semi-Automatic Pistol, which has been utilized as the Department of Defense's personal defense weapon since 1985, is being replaced by the new M17 Full Size Modular Handgun. The M18 Compact Size Modular Handgun replaces M11 Handguns. The Modular Handgun System is a Commercial Off the Shelf/ Non-Developmental Item (COTS/NDI) which delivers a more capable system (weapon, ammo and magazines) consistent with the planned force structure and emerging operational needs of the Army. The Modular Handgun System addresses M9 Pistol and M11 Pistol shortcomings with improved lethality, target acquisition, ergonomics, reliability, durability, and maintainability. The Modular Handgun System is ambidextrous capable and accommodates 5th-95th percentile users via modular grips and access to all controls with one hand. Secondary Distribution Army FY 2025 Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 0.034 0.007 - - - - - - - - - - - - - - - - 0.034 0.007 - - - - - - - Justification: There is no Fiscal Year 2027 budget request for this funding line. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L.110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 8635G15325 - Handgun Army UNCLASSIFIED Page 1 of 1 P-1 Line #26 Volume 1 - 165 === page 196 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 3000GB3000 / MK-19 Grenade Machine Gun MODS Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 20: Mod of Weapons and Other Combat Veh ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0604601A Other Related Program Elements: 0604802A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 120.092 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 44.565 - - - - - - - - - 120.092 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2026 - Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2025 - - - - - - - - - - 44.565 - - - - - - - - - - - - - - - - - - - 44.565 - - - - - - - - - 120.092 To FY 2031 Complete Total 164.657 164.657 164.657 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 271.701 372.527 Description: The MK19 Grenade Machine Gun MODS program supports the Army Modernization priorities (Build a More Lethal Force) through enhancement of Joint Lethality in contested environments by minimizing and eliminating erosion of close combat capability relative to peer competitors in complex terrain. The MK19 Mod 3 is a self-powered, air-cooled, 40mm automatic grenade machine gun with a firing rate of 325-375 rounds per minute. It is used to engage point targets up to 1,500 meters and provide suppressive fire at ranges up to 2,200 meters. Various system enhancements have been identified to improve the system by increasing operational capabilities and improving reliability, readiness, maintainability, and safety. The MK19 is fielded with the MK93 mount for vehicle utilization and the M205 Tripod for ground deployment during static defensive operations. An ongoing system improvement is application of an improved mechanical sight thru a Modification Work Order. The improved sight decreases the MK19 logistic burden by reducing the number of parts as well as increasing Soldier lethality thru updated ballistic solutions. The Mounted Machine Gun Optic (MMO) will provide increased accuracy by equipping the MK19 with a combined reflex and magnified optic to mounted Combat Support & Combat Service Support (CS/CSS) troops, who currently have no optic. The Mounted Machine Gun Optic (MMO) will significantly improve target identification, target acquisition and effective engagement time at extended ranges while retaining the capability of short range, transition fire. MK93 Improvement Kits will enhance hit performance and improve Soldier interface with optical sighting systems during on the move engagement by dampening mount movement. The XM101 Programmer Unit (PU) provides the means for fuze setting for the 40mm High Velocity, High Explosive Dual Purpose-Air Burst (HEDP-AB) capability for the MK19. Secondary Distribution Army FY 2025 Quantity Total Obligation Authority Total: Secondary Distribution FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 44.565 - - - - - - - - - - - - - - - - - 44.565 - - - - - - - - Quantity Total Obligation Authority FY 2027 Base FY 2026 Justification: There is no Fiscal Year 2027 budget request for this funding line. LI 3000GB3000 - MK-19 Grenade Machine Gun MODS Army UNCLASSIFIED Page 1 of 1 P-1 Line #27 Volume 1 - 166 === page 197 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 3005GZ1700 / M777 Mods Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 20: Mod of Weapons and Other Combat Veh ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 211.153 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 211.153 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 211.153 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 2.429 1.569 - 1.569 1.569 1.586 1.587 - - - - - - - 2.429 1.569 - 1.569 1.569 1.586 1.587 - - - - - - - 2.429 1.569 - 1.569 1.569 1.586 1.587 186.998 186.998 186.998 To FY 2031 Complete - Total - 1.604 Continuing - Continuing - 1.604 Continuing - Continuing - - 1.604 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Lightweight 155mm Howitzer (LW155), also known as the M777A2, is a Joint Service program between the United States Marine Corps (USMC) and the United States Army. The M777A2 provides direct, reinforcing, and general support fires to maneuver forces and direct support artillery. The M777A2 was first introduced into the United States Marine Corps (USMC) in 2005 and the Marines have fielded the howitzer to all active units. The Army has fielded the howitzer to its Stryker Brigade Combat Teams (SBCTs) and Infantry Brigade Combat Teams (IBCTs), including the National Guard. The M777A2 fires unassisted projectiles up to a range of 30 kilometers (km) and assisted projectiles up to 40km. The addition of the digital fire control system enables the weapon to program and fire the improved Excalibur precision-guided munitions to ranges up to 40km near precision accuracy. The M777A2 is the first ground combat system whose major structures are made of high strength titanium alloy, and the system makes extensive use of hydraulics to operate the breech, load tray, recoil, and wheel arms. The combination of titanium structures and the use of hydraulic systems resulted in significant weight savings of 7,000 pounds over the legacy M198 howitzer system. It is a successful Joint Service program between the USMC and U.S. Army working together to develop, produce, field, and sustain the howitzer. The howitzer will be going through critical digital fire control modernizations to ensure continued interoperability, secured communication and survivability on the battlefield. This Budget Line Item supports various system critical Digital Fire Control System (DFCS) hardware and software modifications. Secondary Distribution Army Quantity Total Obligation Authority ANG Total: Secondary Distribution FY 2025 FY 2027 Base FY 2026 - 186.998 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - 1.391 1.569 - 1.569 1.569 1.586 1.587 1.604 Quantity - - - - - - - - - Total Obligation Authority - 1.038 - - - - - - - Quantity - - - - - - - - - 2.429 1.569 - 1.569 1.569 1.586 1.587 1.604 Total Obligation Authority 186.998 Justification: LI 3005GZ1700 - M777 Mods Army UNCLASSIFIED Page 1 of 2 P-1 Line #28 Volume 1 - 167 === page 198 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 20: Mod of Weapons and Other Combat Veh ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3005GZ1700 / M777 Mods Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Fiscal Year (FY) 2027 funding in the amount of $1.569 million will support the retrofit of major system components, software modifications, procured hardware and software modifications and efforts to upgrade the Digital Fire Control System (DFCS), which will enable continued system readiness. Net funding decrease from FY 2026 to FY 2027 reflects the completion of procurement of upgraded DFCS operating system software and hardware components required to comply with latest guidance and encryption protocols on the M777A2 Platform. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 3005GZ1700 - M777 Mods Army UNCLASSIFIED Page 2 of 2 P-1 Line #28 Volume 1 - 168 === page 199 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 3181GZ1500 / Sniper Rifles Modifications Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 20: Mod of Weapons and Other Combat Veh ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0604601A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - - 51.351 1.572 0.019 - - - - - - - - 52.942 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Total - - - - - - - - - - - - 51.351 1.572 0.019 - - - - - - - - 52.942 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) To FY 2031 Complete - - - - - - - - - - - - 51.351 1.572 0.019 - - - - - - - - 52.942 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Sniper Rifles Modifications program supports the Army Modernization priorities (Build a More Lethal Force) through enhancement of Joint Lethality in contested environments by minimizing and eliminating erosion of close combat capability relative to peer competitors in complex terrain. The program conducts investigative engineering studies, procure modifications or conversions of sniper weapons and related system components to include gages/gage kits, Advanced Sniper Accessory Kit (ASAK) items, M151 Spotting Scope System, Tactical Tripod Kit (TTK) components, sniper optics, laser range finders, and ballistic compensating systems. Initial buys of items to support or meet operational needs and lighten sniper load. It includes the procurement of rifle scope optics, spotting scopes, an accompanying Accessory Interface Mounting kit (AIM), Improved Sniper Tripod, improved capabilities including an enhanced common reticle pattern and special tool kit. This program also provides improved ancillary equipment such as intelligent rails, ballistic chronographs, Ballistic Weather Meter (BWM), Sniper Scope Covert Cap, Weapon Tripod Cradle, Sniper Data Board, improved Sniper Buttstock, Sniper Tool Kit, Sniper Accessory Mount, improved Upper Receiver Groups and/or recalibered barrels, fire controls, enhanced suppressors, other components, and support costs. The current Army fleet of sniper weapons, consisting of the M110 Semi-Automatic Sniper System (SASS), the M2010 Enhanced Sniper Rifle (ESR), the M107 Semi-Automatic Long Range Sniper Rifle (LRSR), the MK22 Precision Sniper Rifle (PSR) and the M110A1 Squad Designated Marksman Rifle (SDMR), require continuous upgrades to the weapon, components, and/or ancillary equipment. Sniper upgrades seek to enhance sniper mission capability, effectiveness, and survivability by overmatching continuously evolving threats and extending the sniper's influence through emerging technologies in perfecting ballistics with exacting hardware and precise calculations, reducing sniper team burden through decreased weight and enhanced ergonomics, portability, signature reduction, faster more precise target reconnaissance, surveillance, and target acquisition (RSTA) and precision aiming with automated ballistic prediction systems. Upgrades also support sniper/spotter mission collaboration with information sharing of targets and better situational awareness. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 3181GZ1500 - Sniper Rifles Modifications Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 1.572 0.019 - - - - - - - - - - - - - - - - 1.572 0.019 - - - - - - - UNCLASSIFIED Page 1 of 2 P-1 Line #29 Volume 1 - 169 === page 200 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 20: Mod of Weapons and Other Combat Veh ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 3181GZ1500 / Sniper Rifles Modifications Program Elements for Code B Items: 0604601A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Justification: There is no Fiscal Year 2027 budget request for this funding line. In accordance with Section 1815 of the FY 2008 National Defense Act, (P.L.110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 3181GZ1500 - Sniper Rifles Modifications Army UNCLASSIFIED Page 2 of 2 P-1 Line #29 Volume 1 - 170 === page 201 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 3640GC0401 / M119 Modifications Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 20: Mod of Weapons and Other Combat Veh ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 426.710 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 426.710 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 426.710 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 12.823 4.642 4.453 - 4.453 9.139 9.929 1.602 - - - - - - - - 12.823 4.642 4.453 - 4.453 9.139 9.929 1.602 - - - - - - - - 12.823 4.642 4.453 - 4.453 9.139 9.929 1.602 To FY 2031 Complete - Total - 1.619 Continuing - Continuing - 1.619 Continuing - Continuing - - 1.619 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The M119A3 Towed Howitzer provides direct fire support for the Infantry Brigade Combat Teams (IBCTs). This funding supports the application of modernization system enhancements required to ensure continued operational availability, including the integration of digital fire control components required to execute secure, digital fire missions and maintain interoperability on the battlefield. Modification efforts include, but are not limited to, the upgrade of the system's legacy radio to support new encryption protocols, upgrade of the system's digital fire control to support migration to a new operating system, which will provide the M119A3 howitzer with the continued ability to conduct near precision fires in a Global Positioning System (GPS) contested environment while maintaining current operational tempo. These modernization upgrades enhance crew survivability as direct supporting rapid emplacement, conducting of fire mission, and displacement. This program also supports the installation and retrofit of modification kits to the M119A3 Howitzer. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 12.823 4.642 4.453 - 4.453 9.139 9.929 1.602 1.619 - - - - - - - - - 12.823 4.642 4.453 - 4.453 9.139 9.929 1.602 1.619 Justification: Fiscal Year 2027 funding in the amount of $4.453 million will support the continuation of efforts to integrate hardware and software required to comply with latest guidance and encryption protocols onto the M119 howitzer platform, efforts to retrofit major system components, efforts to complete required software modifications, and efforts to upgrade the Digital Fire Control (DFC), which will enable continued system readiness. Net funding decrease from FY 2026 to FY 2027 reflects the completion of the procurement of a new Fire Control Computer to support an upgraded operating system and software. LI 3640GC0401 - M119 Modifications Army UNCLASSIFIED Page 1 of 2 P-1 Line #30 Volume 1 - 171 === page 202 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 20: Mod of Weapons and Other Combat Veh ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3640GC0401 / M119 Modifications Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 3640GC0401 - M119 Modifications Army UNCLASSIFIED Page 2 of 2 P-1 Line #30 Volume 1 - 172 === page 203 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 1862GL3200 / Items Less Than $5.0m (WOCV-WTCV) Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 30: Support Equipment & Facilities ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 247 197.224 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 197.224 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 197.224 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 19.617 0.469 0.512 - 0.512 0.497 0.520 0.520 - - - - - - - - 19.617 0.469 0.512 - 0.512 0.497 0.520 0.520 - - - - - - - - 19.617 0.469 0.512 - 0.512 0.497 0.520 0.520 To FY 2031 Complete - Continuing 0.525 Continuing - Total Continuing Continuing - 0.525 Continuing - Continuing - - 0.525 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 798.478 Continuing Continuing Description: This program provides for the procurement and fielding of standard and non-standard small arms to include auxiliary components such as tripods, combat optics, protective lens coatings for optics, fire controls, suppressors, powered/ intelligent rails, weapon mounts/platforms, and adaptors and to meet urgent needs or initial buys. Weapons and auxiliary components procured under this budget activity in prior years consist of MK48 Machine Guns, Modular Handgun System (MHS) and associated Basic Issue Items (BII), Multi-Role Anti-Armor Anti-Personnel Weapon System (MAAWS), M500 Mossberg Shotguns, MP5KA and APC9K Submachine Guns, as well as non-standard weapons. The program included magazines, clamps, holsters, slings, lanyards, spare parts, cleaning kits and other weapon components. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 19.617 0.469 0.512 - 0.512 0.497 0.520 0.520 0.525 - - - - - - - - - 19.617 0.469 0.512 - 0.512 0.497 0.520 0.520 0.525 Justification: FY 2027 Base procurement dollars in the amount of $0.512 million supports the Active Army by providing funding for the procurement, fielding, training, and safety assessments of various Standard and NonStandard Weapons and accessories. These weapons are required to facilitate training of U.S. Army and foreign security forces on host nation weapon systems. Funding will purchase Non-Standard weapons to support the Regionally Aligned Forces (RAF), Security Force Assistance Brigades, International Special Training Center (ISTC), Security Force Assistance Foreign Weapons Course, and the Military Advisor Training Academy. Funding will support the Army Marksmanship Unit (AMU) to maintain and procure the specialized target rifles/accessories, standard and non-standard caliber Pistols, Rifles, Shot Guns, Machine Guns, Grenade Launchers, and Shooting glasses and scopes. Includes limited distribution weapons/accessories such as world class Olympic Grade marksmanship weapons and accessories to support the AMU as needed. Air Rifles and small caliber weapons to support Police/Provost Marshal Division to assist with varmint control. Additionally, modifications/improvements to 40mm programming unit for air burst and counter-unmanned aerial system capabilities. LI 1862GL3200 - Items Less Than $5.0m (WOCV-WTCV) Army UNCLASSIFIED Page 1 of 2 P-1 Line #31 Volume 1 - 173 === page 204 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 30: Support Equipment & Facilities ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 1862GL3200 / Items Less Than $5.0m (WOCV-WTCV) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 1862GL3200 - Items Less Than $5.0m (WOCV-WTCV) Army UNCLASSIFIED Page 2 of 2 P-1 Line #31 Volume 1 - 174 === page 205 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 30: Support Equipment & Facilities Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 873.300 873.300 873.300 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 119.591 119.591 119.591 94.913 94.913 94.913 308.110 - - 308.110 - - 308.110 - 308.110 308.110 308.110 345.509 345.509 345.509 365.419 365.419 365.419 79.050 79.050 79.050 To FY 2031 Complete 79.896 Continuing - Continuing - 79.896 Continuing - Total - Continuing - - 79.896 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: This program provides funding to establish, modernize, expand, or replace Government owned industrial facilities and equipment used in production and production testing of Weapons and Tracked Combat Vehicles (WTCV) and their components. In some exceptional instances, this program also provides funding to establish, rehabilitate, modernize, convert, or expand privately owned plants to support current production and production testing when the investment is in the best interest of the Army. The program also provides for the preserving, storing, and disposing of equipment that are either not required for current active production or are not needed by the Army. Production Base Support (PBS) efforts occur at Joint Systems Manufacturing Center (JSMC) in Lima, OH, Watervliet Arsenal (WVA) in Watervliet, NY, Joint Manufacturing and Technology Center (JMTC) at Rock Island Arsenal (RIA), IL, Selfridge Air National Guard Base (SANG) located in Harrison Township, MI, Anniston Army Depot (ANAD) in Anniston, AL and BAE Systems Vehicle Upgrade and Overhaul Center (VUOC) located in Sterling Heights, MI, Anniston, AL, and York, PA. This program also provides funding for the Arsenal 5-Year Plan(s) for maintaining and modernizing the Organic Industrial Base. The Production Base Support program, as a shared funding line, also provides funding to the Army Test and Evaluation Command (ATEC) to establish, modernize, expand, or replace test facilities used in production testing of Weapons and Tracked Combat Vehicles and their components. It sustains the Army's production test capabilities through upgrade and replacement of instrumentation and equipment that is technologically and/or economically obsolete. Modernization of test instrumentation and equipment provides for more timely increased automation and efficiencies, improved data quality and quantity resulting in cost and risk avoidance to Army Program Managers. Programmed funding will be used to upgrade/modernize or replace production test instrumentation and equipment at Aberdeen Test Center (ATC), Aberdeen Proving Ground, MD; White Sands Test Center (WSTC), White Sands Missile Range, NM, and Yuma Test Center (YTC), Yuma Proving Ground, AZ. Funding supports investments at the Joint Systems Manufacturing Center-Lima and/or at other pre or post manufacturing sites to procure equipment, facilities, and supporting infrastructure critical for the production of Abrams M1E3 tanks. These manufacturing investments will establish essential capabilities for M1E3 tank production to include structure fabrication, automated machining, plate processing, robotic welding, automated tooling and work cells to modernize the assembly line, and automated inspection. To achieve production readiness requires new/modernized facilities and equipment, including: a new armor installation facility with automated equipment, an upgraded powerhouse facility with expanded utilities, and supporting infrastructure improvements. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 1 of 56 P-1 Line #32 Volume 1 - 175 === page 206 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 30: Support Equipment & Facilities Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 - 119.591 119.591 LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army 94.913 94.913 FY 2027 OOC - 308.110 308.110 UNCLASSIFIED Page 2 of 56 FY 2027 Total - FY 2028 - FY 2029 - 308.110 345.509 - - 308.110 345.509 P-1 Line #32 FY 2030 - 365.419 365.419 FY 2031 - - 79.050 79.896 - - 79.050 79.896 Volume 1 - 176 === page 207 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 30: Support Equipment & Facilities Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Project Schedule Exhibit Type Project Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) - 119.591 94.913 308.110 - 308.110 Joint Systems Manufacturing Center (JSMC) - Lima - 61.018 69.098 300.955 - 300.955 P-25 JSMC001 - JSMC Miscellaneous Small Projects - 7.443 10.589 11.805 - 11.805 P-25 JSMC041 - Replace HML South Transfer & Coolant System - 8.762 - - - - P-25 JSMC042 - Machining Upgrade HM0035 A&B - 20.813 - - - - P-25 JSMC043 - Machining Upgrade HM0036 - 11.000 - - - - P-25 JSMC044 - B266/B281 Underground Utilities Upgrades - 12.000 - - - - P-25 JSMC045 - Digital Engineering / Digital Manufacturing - 1.000 3.800 3.000 - 3.000 P-25 JSMC047 - New Armor Building - - 28.012 34.000 - 34.000 P-25 JSMC048 - Facility Modernization - Contractor Support - - 1.478 3.000 - 3.000 P-25 JSMC049 - New Hardstand for Abrams Structures - - 18.271 - - - P-25 JSMC051 - Production & Process Modernization Alignment - - 5.748 - - - P-25 JSMC052 - Upgrade Fire Pump System - - - 2.900 - 2.900 P-25 JSMC053 - Powerhouse Building - - - 38.000 - 38.000 P-25 JSMC054 - Warehouse/Storage Building - - - 37.000 - 37.000 P-25 JSMC056 - Weld Equipment & Training - - - 5.600 - 5.600 P-25 JSMC057 - Hull & Turret Fume Extraction - - - 4.300 - 4.300 P-25 JSMC058 - Hull & Turret Weld Robots - - - 13.500 - 13.500 P-25 JSMC059 - Turret Machining Tooling & Equipment - - - 3.200 - 3.200 P-25 JSMC060 - Hull Tooling & Fixturing - - - 5.000 - 5.000 P-25 JSMC061 - Hull Build Station Fixture & Tooling - - - 4.000 - 4.000 P-25 JSMC062 - Hull & Turret Positioning Equipment - - - 1.800 - 1.800 P-25 JSMC063 - Assembly Equipment & Facilitization - - - 1.600 - 1.600 P-25 JSMC064 - Upgrade Fire Suppression System - - 1.200 - - - P-25 JSMC065 - Engine Dynamometer - - - 9.000 - 9.000 P-25 JSMC066 - Production Vehicle Battery Storage - - - 11.750 - 11.750 P-25 JSMC067 - Boresight Equipment Upgrades - - - 3.000 - 3.000 P-25 JSMC068 - Turret Loader Test Stand - - - 3.000 - 3.000 P-25 JSMC069 - Assembly Line Modernization - - - 26.000 - 26.000 P-25 JSMC070 - New Equipment - A-dock Reinforcement - - - 15.000 - 15.000 P-25 JSMC071 - Production Equipment & Process Modernization - - - 31.000 - 31.000 P-25 JSMC072 - Small Parts Paint line - - - 18.400 - 18.400 P-25 JSMC073 - Site Concrete Replacement - - - 5.000 - 5.000 P-25 JSMC074 - Perimeter Fence Outfall Repairs & Storm Water Drainage Improvements - - - 1.500 - 1.500 (Uncategorized) LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 3 of 56 P-1 Line #32 Volume 1 - 177 === page 208 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 30: Support Equipment & Facilities Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Project Schedule Exhibit Type Project Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) P-25 JSMC075 - Scanning Equipment - - - 3.000 - 3.000 P-25 JSMC076 - Blast Booth Upgrades - - - 2.000 - 2.000 P-25 JSMC077 - B186 Shipping/Receiving Docks - - - 3.600 - 3.600 Rock Island Arsenal - Joint Manufacturing and Technology Center (RIA-JTMC) - 13.600 - - - - P-25 JMTC006 - JMTC Miscellaneous Small Projects - 1.000 - - - - P-25 JMTC012 - Coreless Induction Furnace - 2.300 - - - - P-25 JMTC013 - Melt Furnace With Advanced Refinement - 10.300 - - - - Selfridge Air National Guard (SANG) Base - 7.500 - - - - P-25 SANG002 - High-Bays Design - 4.500 - - - - P-25 SANG003 - High-Bays Site Preparation - 3.000 - - - - Watervliet Arsenal (WVA) - 4.901 21.940 2.250 - 2.250 P-25 WVA0027 - WVA Miscellaneous Small Projects - 1.201 2.700 1.000 - 1.000 P-25 WVA0055 - Tri-Chrome Conversion - 2.700 8.000 1.250 - 1.250 P-25 WVA0060 - Cold Spray Smooth Bore Qualification - 1.000 - - - - P-25 WVA0061 - WVA Profile Verification Process (PVP) Replacement - - 2.290 - - - P-25 WVA0062 - Mill Turn 6600NT - - 4.950 - - - P-25 WVA0063 - Forge Mandrel Option - - 4.000 - - - AMPV Anniston Deprocessing Site - 10.000 - 1.000 - 1.000 P-25 ANAD - Expansion of Deprocessing Site - 10.000 - 1.000 - 1.000 BAE Systems Vehicle Upgrade and Overhaul Center (VUOC) - 18.737 - - - - BAE002 - M88 Hull Tech Data - 18.737 - - - - Army Test and Evaluation Command (ATEC) Facilities - 3.835 3.875 3.905 - 3.905 ATEC - ATEC Facilities - 3.835 3.875 3.905 - 3.905 Total Gross/Weapon System Cost - 119.591 94.913 308.110 - 308.110 P-25 P-25 *For the P-17 and P-25, the Project column displays a three-level indentation: Project Category (e.g., Environmental), followed by the Facility, followed by the Project Name. Exhibits with no Project Category are included under the "Uncategorized" category. For the P-26, the Project column displays a two-level indentation: Project Type (e.g., Inactive Plants, Inactive Lines at Contractor Plants and Inactive Lines at Active Plants), followed by the Facility. Note also that although all P-17, P-25 and P-26 projects are shown in the project schedule, not all projects will have a corresponding exhibit. A P-17 or P-25 exhibit is only included if data beyond the Project Number, Project Title and Cost are included (for example: for the P-17, Description, Manufacturer, etc.; for the P-25, Narrative Explanation, Cost Elements, Principle Milestones, etc.). A P-26 exhibit is only included if data beyond Project Type and Total Cost are included (for example, Description, Contractor, Maintenance/Recurring/Environmental/Other costs, etc.). Justification: FY 2027 Base procurement dollars in the amount of $308.110 million supports Army Production Base Support activities at the Joint Systems Manufacturing Center (JSMC) in Lima, OH; Watervliet Arsenal (WVA) in Watervliet, NY; and the Army Test and Evaluation Command (ATEC). This funding line is shared amongst Project Manager (PM) Abrams, PM Mounted Armored Vehicles (MAV) and ATEC. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 4 of 56 P-1 Line #32 Volume 1 - 178 === page 209 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A: Procurement of W&TCV, Army / BA 02: Weapons and Other Combat Vehicles / BSA 30: Support Equipment & Facilities ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A The significant investment in Joint Systems Manufacturing Center (JSMC), Watervliet Arsenal (WVA), Anniston Army Depot (ANAD), and ATEC is due to aging infrastructure and the increased organic industrial base capabilities, the manufacturing of equipment, and facility improvements. The objective is to advance industrial base capabilities to implement risk mitigation strategies that ensure production capacities meet required aggregate demand. The activities of the Army Production Base Support are as follows: Program Manager (PM) Abrams Production Base Support activities: - Joint Systems Manufacturing Center (JSMC) - Lima, OH: $300.955 million supports organic industrial base upgrades and improvement at JSMC to optimize PM Abrams production. Major efforts include replacement of end-of-life equipment and production infrastructure used in the manufacture of Abrams tanks, modernization of equipment and infrastructure used, and upgrade of real property at JSMC. - Watervliet Arsenal (WVA) - Watervliet, NY: $2.250 million supports organic industrial base upgrades and improvements at WVA. Major efforts include the equipment and conversion from hexavalent chromium plating to trivalent chromium plating. PM MAV, Product Manager (PdM) Armored Multi-Purpose Vehicle (AMPV) Production Base Support activities: - Anniston Army Depot (ANAD) - Anniston, AL: $1.000 million supports organic industrial base upgrades of real property and improvement at PdM AMPV's Deprocessing Site at ANAD to optimize AMPV production. The objective is to advance capabilities of deprocessing throughput to meet required production and fielding capacities. Army Test and Evaluation Command (ATEC): $3.905 million supports: - Aberdeen Test Center (ATC) continued modernization of fire control instrumentation required to assess weapon system fire control performance on a wide range of test items. Aberdeen Test Center will continue replacing and upgrading weapon, sight, and target scoring high-definition video cameras, recorders, digital video processing systems, fiber optic converters, and telemetry systems. Replacement equipment is scheduled to address obsolescence issues, software compatibility gaps, and deterioration of existing hardware while ensuring test equipment maintains pace with technological advances of test items to preclude lack of test support. Aberdeen Test Center will also procure new instrumentation that will allow Electromagnetic Interference (EMI) testing of current and future military platforms, including autonomous vehicles. - White Sands Test Center (WSTC), Army Test and Evaluation Command (ATEC) will continue to maintain and upgrade existing equipment and instrumentation for the developing and evolving White Sands Missile Range (WSMR) to include directed energy, High-Power Microwave (HPM), Electromagnetic Pulse (EMP) and lightning effects test simulators. These items include sensors, oscilloscopes, fiber optic links, vacuum systems, cryogenic superconducting magnets, waveguides, antennas, cathodes, insulators, and various cabling and subassemblies. These efforts will help the White Sands Test Center meet regulatory, customer, and/or evolving mission requirements. - Yuma Test Center (YTC) will acquire upgrades sensors, sensor positioning equipment, control hardware, signal conditioners, and other data acquisition equipment and software to modernize and improve accuracy and efficiency of ballistics data acquisition. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 5 of 56 P-1 Line #32 Volume 1 - 179 === page 210 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: JSMC Miscellaneous Small Projects Project Number: JSMC001 Project Category: End Item Supported Model: Abrams Cost Elements ($ in Millions) Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO A. Construction Cost 0.227 - - - B. Equipment Cost - 5.414 8.530 - C. Equipment Installation Cost 7.216 3.975 - - D. Contractor Support Cost - - 2.371 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - 1.200 0.904 - Concept Design Complete: 2.371 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: 0.904 Total Project Cost 7.443 10.589 11.805 - 11.805 8.530 Principal Milestones Month & Year - Project Number Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $11.805 million supports the Abrams Tank Production Process and Abrams Industrial Base by focusing on operating, maintaining improving, optimizing, and modernizing the manufacturing facilities, infrastructure, production equipment, production support equipment, digital acquisition infrastructure, and data storage located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. This includes multiple projects which are individually estimated at less than $1.000 million. If one of these miscellaneous small projects cost increases to over $1.000 million due to supply chain, inflation, or other factors, the Project Manager (PM) will execute and provide documentation within 60 days. FY 2026 Base procurement dollars estimated in the amount of $10.589 million supports the Abrams Tank Production Process and Abrams Industrial Base by focusing on operating, maintaining improving, optimizing, and modernizing the manufacturing facilities, infrastructure, production equipment, production support equipment, digital acquisition infrastructure, and data storage located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. This includes multiple projects which are individually estimated at less than $1.000 million. If one of these miscellaneous small projects cost increases to over $1.000 million due to supply chain, inflation, or other factors the PM will execute and provide documentation within 60 days. FY 2025 Base procurement dollars in the amount of $7.443 million supports the Abrams Tank Production Process and Abrams Industrial Base by focusing on maintaining improving, optimizing, and modernizing the manufacturing facilities, infrastructure, production equipment, production support equipment, and digital acquisition infrastructure and data storage located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. This includes multiple projects which are individually estimated at less than $1.000 million. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 6 of 56 P-1 Line #32 Volume 1 - 180 === page 211 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Replace HML South Transfer & Coolant System Project Number: JSMC041 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost 8.762 - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost 8.762 - - - - Cost Elements ($ in Millions) Month & Year Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2025 Base procurement dollars in the amount of $8.762 million supports refurbishment of pallet transfer system and replace the coolant filtration system on the South Hull Machining Line (HML) located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. Project includes refurbishment of bedways, rabbit systems, and clamping stations; replacement of hydraulic systems, electrical controls, HMIs, and coolant filtration systems; removal and disposal of Coolant System. Pallet transfer and coolant filtration systems on the south end of the HML were installed in 2007 and are nearing the end of their service life, frequently experiencing electrical and mechanical problems associated with deterioration. The north end for the HML was refurbished/replaced during the installation of HM0016 & HM0039 in 2023. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 7 of 56 P-1 Line #32 Volume 1 - 181 === page 212 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Machining Upgrade HM0035 A&B Project Number: JSMC042 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost 20.813 - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost 20.813 - - - - Cost Elements ($ in Millions) Month & Year Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2025 Base procurement dollars in the amount of $20.813 million supports the installation of new machines in the previous HM0035 A&B sites located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. This project includes removal and disposal of old machines, new machines, tool changer, head attachments, foundation, and all ancillary equipment. HM0035 A&B were placed in service in 2008 and are at the end of their service life, frequently experiencing electrical and mechanical problems associated with deterioration. The age of these machines results in part obsolescence which causes excess downtime and high maintenance costs. JSMC Horizontal Boring Mill Structure Machining on the Hull Machining Line is currently reliant on HM0016 A&B and HM0035 A&B. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 8 of 56 P-1 Line #32 Volume 1 - 182 === page 213 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Machining Upgrade HM0036 Project Number: JSMC043 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost 11.000 - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost 11.000 - - - - Cost Elements ($ in Millions) Month & Year Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2025 Base procurement dollars in the amount of $11.000 million supports the installation of a new machine in the previous HM0036 site located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. This project includes removal and disposal of HM0036, new machine, tool changer, head attachments, foundation, and all ancillary equipment. HM0036 was placed in service in 2008 and is at the end of its service life, frequently experiencing electrical and mechanical problems associated with deterioration. The age of this machine results in part obsolescence which causes excess downtime and high maintenance cost. The JSMC Gantry Mill Structure Machining on the Hull Machining Line is currently reliant on HM0037 and HM0039. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 9 of 56 P-1 Line #32 Volume 1 - 183 === page 214 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: B266/B281 Underground Utilities Upgrades Project Number: JSMC044 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost 12.000 - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost 12.000 - - - - Cost Elements ($ in Millions) Month & Year Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2025 Base procurement dollars in the amount of $12.000 million supports the replacement of utilities to increase system reliability and allow for better isolation at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. The existing underground utilities are beyond their useful service life. Part of the system is original to the facility, dating back to the 1940s, while others were upgraded in the 1980s. There are numerous system failures due to age requiring frequent repairs. Numerous gate valves are non-functioning, preventing shutoff of services in the event of an emergency, increasing the time to shutoff the system, and isolating larger areas of the facility. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 10 of 56 P-1 Line #32 Volume 1 - 184 === page 215 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Digital Engineering / Digital Manufacturing Project Number: JSMC045 Project Category: End Item Supported Model: Abrams Cost Elements ($ in Millions) Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC A. Construction Cost - - - - B. Equipment Cost - 1.800 1.000 - C. Equipment Installation Cost - - - - D. Contractor Support Cost FY 2027 Total - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO 1.000 Principal Milestones Month & Year - 1.000 2.000 2.000 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - Concept Design Complete: 2.000 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost 1.000 3.800 3.000 - 3.000 Project Number Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $3.000 million supports the modernization of the digital acquisition infrastructure and data storage for the Abrams tank manufacturing facility located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. This project will allow more visibility into production processes, add understanding of current bottlenecks, and inform future production technology and process improvements. FY 2026 Base procurement dollars in the amount of $3.800 million supports continued modernization of the digital acquisition infrastructure and data storage for the Abrams JSMC tank manufacturing facility. FY 2025 Base procurement dollars in the amount of $1.000 million began the modernization of the digital acquisition infrastructure and data storage for the Abrams tank manufacturing facility located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. This project will allow more visibility into production processes, add understanding of current bottlenecks, and inform future production technology and process improvements. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 11 of 56 P-1 Line #32 Volume 1 - 185 === page 216 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: New Armor Building Project Number: JSMC047 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC FY 2027 Total FY 2025 FY 2026 A. Construction Cost - - 26.000 - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH 26.000 Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - 4.000 - 4.000 Principal Milestones C. Equipment Installation Cost - 27.012 2.000 - D. Contractor Support Cost - - 2.000 - E. Corps of Engineers Support Cost - 1.000 - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - 2.000 Concept Design Complete: 2.000 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - 28.012 34.000 - 34.000 Cost Elements ($ in Millions) Project Number Month & Year Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $34.000 million supports the continuation of the configuration and utility work to prepare for the new Abrams armor building and facility improvements efforts located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. The new Abrams armor building and facility expansion and improvement efforts will allow for increased production capacity, automation, and modernization of capabilities to support Abrams tank production. The facility provides the ability to build new turrets as well as reclaim old turrets to support Abrams tank production. This building is required to meet 705 security code requirements. FY 2026 Base procurement dollars estimated in the amount of $28.012 million supports requirements development and design for the new armor building, related infrastructure, and expansion efforts located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. The new Abrams turret armor facility supports turret new builds and armor installation. The facility provides the ability to build new turrets as well as reclaim old turrets to support Abrams tank production. This building is required to meet 705 security code requirements. The current turret armor building has limited space to support required production capacity and low ceilings that restrict automation. More space and equipment is needed to support the Abrams tank modernization requirements. The complete design of the Armor building and related expansion efforts at JSMC is to be used to inform manufacturing and production plans and project cost estimates. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 12 of 56 P-1 Line #32 Volume 1 - 186 === page 217 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Facility Modernization - Contractor Support Project Number: JSMC048 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost - - - - - D. Contractor Support Cost - 1.478 3.000 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - Concept Design Complete: 3.000 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - 1.478 3.000 - 3.000 Cost Elements ($ in Millions) Project Number Month & Year Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $3.000 million supports the continuation of engineering and skilled trade supporting the modernization expansion and improvement efforts located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. The new Abrams armor building and facility expansion efforts will allow for increased production capacity, automation, and modernization of capabilities to support Abrams tank production. Contractor engineering and skilled trade will support requirement development, design efforts, manufacturing, and installation. FY 2026 Base procurement dollars estimated in the amount of $1.478 million supports engineering and skilled trade support for the modernization expansion efforts located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. The new Abrams armor building and facility expansion efforts will allow for increased production capacity, automation, and modernization of capabilities to support Abrams tank production. Contractor engineering and skilled trade will support requirements development, design efforts, manufacturing, and installation. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 13 of 56 P-1 Line #32 Volume 1 - 187 === page 218 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: New Hardstand for Abrams Structures Project Number: JSMC049 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - 16.321 - - - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost - - - - - D. Contractor Support Cost - 0.700 - - - E. Corps of Engineers Support Cost - 1.250 - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost - 18.271 - - - Cost Elements ($ in Millions) FY 2025 FY 2026 Month & Year Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2026 Base procurement dollars estimated in the amount of $18.271 million supports the design and development of a new hardstand area and supporting infrastructure located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. The new hardstand would support outside storage for Abrams structures (hulls and turrets) and associated large components. JSMC currently has limited outdoor storage available for structures and needs to be relocated as it resides on the current site of the Abrams New Armor Building. The new hardstand area to support ongoing production, material handling, and storage includes repositioning of wetlands, fencing, road, and utilities to be designed to comply with federal, state, local, and Department of Defense requirements. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 14 of 56 P-1 Line #32 Volume 1 - 188 === page 219 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Production & Process Modernization Alignment Project Number: JSMC051 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - 4.000 - - - Principal Milestones C. Equipment Installation Cost - 0.998 - - - D. Contractor Support Cost - 0.750 - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost - 5.748 - - - Cost Elements ($ in Millions) FY 2025 Month & Year Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2026 Base procurement dollars estimated in the amount of $5.748 million supports production equipment and process improvements to align production and modernization expansion efforts located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. This will strengthen JSMC production readiness and aligns with modernization schedules through process flexibility improvement, support program delivery schedules, incorporate technologies that improve efficiency and quality, optimize JSMC manufacturing spaces, ensure efficient material flow, and facilitate JSMC as a center of excellence for required capabilities. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 15 of 56 P-1 Line #32 Volume 1 - 189 === page 220 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Upgrade Fire Pump System Project Number: JSMC052 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC FY 2027 Total FY 2025 FY 2026 A. Construction Cost - - 1.000 - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH 1.000 Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - 1.000 - 1.000 Principal Milestones C. Equipment Installation Cost - - - - D. Contractor Support Cost - - 0.900 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - Concept Design Complete: 0.900 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 2.900 - 2.900 Cost Elements ($ in Millions) Month & Year - Project Number Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $2.900 million supports the procurement and installation of a new fire pump utility system located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. The current fire pumps need to be upgraded to achieve adequate water flow for the system in an emergency time of need. The scope of work also includes an addition to Building 66 to accommodate both fire pump systems in one building; and environmental abatement and demolition of Building 67. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 16 of 56 P-1 Line #32 Volume 1 - 190 === page 221 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Powerhouse Building Project Number: JSMC053 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC FY 2027 Total FY 2025 FY 2026 A. Construction Cost - - 25.000 - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH 25.000 Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - 4.000 - 4.000 Principal Milestones C. Equipment Installation Cost - - - - D. Contractor Support Cost - - 9.000 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - Concept Design Complete: 9.000 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 38.000 - 38.000 Cost Elements ($ in Millions) Month & Year - Project Number Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $38.000 million supports design and development for a new powerhouse building, related infrastructure, and expansion efforts located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. The current powerhouse is at the end of its useful life and needs replacement. The powerhouse building supplies compressed air and steam for production site-wide at JSMC. The new powerhouse needs to be expanded to meet increasing production modernization capacity needs, including the new armor building and growing automation. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 17 of 56 P-1 Line #32 Volume 1 - 191 === page 222 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Warehouse/Storage Building Project Number: JSMC054 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC FY 2027 Total FY 2025 FY 2026 A. Construction Cost - - 26.000 - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH 26.000 Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - 4.000 - 4.000 Principal Milestones C. Equipment Installation Cost - - - - D. Contractor Support Cost - - 7.000 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - Concept Design Complete: 7.000 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 37.000 - 37.000 Cost Elements ($ in Millions) Month & Year - Project Number Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $37.000 million supports the design and development for a new warehouse and storage building, related infrastructure, and expansion efforts located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. The new warehouse and storage building would include material storage with advanced warehouse capabilities and automated warehousing system equipment for secured storage for all Government furnished materials (GFM) and contractor furnished materials (CFM) for tank production. JSMC does not currently have a central storage area for GFM and CFM that will be displaced as a result of new hull and turret machining equipment to establish production capability. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 18 of 56 P-1 Line #32 Volume 1 - 192 === page 223 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Weld Equipment & Training Project Number: JSMC056 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC - - - - 4.000 - - - - - D. Contractor Support Cost - - 1.600 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - Concept Design Complete: 1.600 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 5.600 - 5.600 Cost Elements FY 2025 FY 2026 A. Construction Cost - B. Equipment Cost - C. Equipment Installation Cost ($ in Millions) FY 2027 Total - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO 4.000 Principal Milestones Month & Year - Project Number Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $5.600 million supports the procurement and installation of new Abrams hull & turret weld equipment, weld school training, and qualification material required to perform welding operations of the new Abrams structures located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 19 of 56 P-1 Line #32 Volume 1 - 193 === page 224 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Hull & Turret Fume Extraction Project Number: JSMC057 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC - - - - 4.300 - - - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Total Project Cost - - 4.300 - 4.300 Cost Elements FY 2025 FY 2026 A. Construction Cost - B. Equipment Cost - C. Equipment Installation Cost ($ in Millions) FY 2027 Total - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO 4.300 Principal Milestones Month & Year Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $4.300 million supports the procurement and installation of new Abrams hull & turret fume extraction equipment located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. This project includes equipment to re-establish capabilities to remove hazardous emissions from the fabrication environment of hull structures, turret structures, and sub-weldments which will be instrumental in the fabrication of new Abrams structures. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 20 of 56 P-1 Line #32 Volume 1 - 194 === page 225 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Hull & Turret Weld Robots Project Number: JSMC058 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC - - - - 12.000 - 12.000 Principal Milestones - - 1.500 - D. Contractor Support Cost - - - - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - 1.500 Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 13.500 - 13.500 Cost Elements FY 2025 FY 2026 A. Construction Cost - B. Equipment Cost - C. Equipment Installation Cost ($ in Millions) FY 2027 Total - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO Project Number Month & Year Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $13.500 million supports the procurement and installation of new Abrams hull and turret robotic weld equipment located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. This project includes equipment required to perform robotic welding operations of hull structures, turret structures, and nose sub-weldment. This equipment provides robotic welding capability which will be instrumental in modernizing the fabrication of Abrams structures. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 21 of 56 P-1 Line #32 Volume 1 - 195 === page 226 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Turret Machining Tooling & Equipment Project Number: JSMC059 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC - - - - 2.600 - 2.600 Principal Milestones - - 0.600 - D. Contractor Support Cost - - - - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - 0.600 Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 3.200 - 3.200 Cost Elements FY 2025 FY 2026 A. Construction Cost - B. Equipment Cost - C. Equipment Installation Cost ($ in Millions) FY 2027 Total - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO Project Number Month & Year Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $3.200 million supports the build and installation of new Abrams turret machining tooling and equipment located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. This project includes tooling, fixturing, and equipment required to re-establish capabilities for machining Abrams turret structures. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 22 of 56 P-1 Line #32 Volume 1 - 196 === page 227 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Hull Tooling & Fixturing Project Number: JSMC060 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC - - - - 5.000 - - - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Total Project Cost - - 5.000 - 5.000 Cost Elements FY 2025 FY 2026 A. Construction Cost - B. Equipment Cost - C. Equipment Installation Cost ($ in Millions) FY 2027 Total - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO 5.000 Principal Milestones Month & Year Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $5.000 million supports the build and installation of the new Abrams hull fabrication tooling and fixtures located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. This project includes tooling and fixturing required for setting and locating plate level components, structure positioning, locating appearances and other components to re-establish hull structure fabrication capabilities. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 23 of 56 P-1 Line #32 Volume 1 - 197 === page 228 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Hull Build Station Fixture & Tooling Project Number: JSMC061 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC - - - - 4.000 - - - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Total Project Cost - - 4.000 - 4.000 Cost Elements FY 2025 FY 2026 A. Construction Cost - B. Equipment Cost - C. Equipment Installation Cost ($ in Millions) FY 2027 Total - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO 4.000 Principal Milestones Month & Year Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $4.000 million supports the installation of a new Abrams hull build station fixture and corresponding sets of mandrels located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. This project includes tooling and fixturing required for setting and locating plate level components for hull structure fabrication. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 24 of 56 P-1 Line #32 Volume 1 - 198 === page 229 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Hull & Turret Positioning Equipment Project Number: JSMC062 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC - - - - 1.800 - - - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Total Project Cost - - 1.800 - 1.800 Cost Elements FY 2025 FY 2026 A. Construction Cost - B. Equipment Cost - C. Equipment Installation Cost ($ in Millions) FY 2027 Total - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO 1.800 Principal Milestones Month & Year Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $1.800 million supports the procurement and installation of new Abrams hull & turret positioning equipment located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. This project includes rollover and skyhook positioners required for setting hull structures, turret structures, and sub-weldments in an orientation for in-position welding operations. This equipment provides a capability which will be instrumental in the fabrication of new Abrams structures. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 25 of 56 P-1 Line #32 Volume 1 - 199 === page 230 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Assembly Equipment & Facilitization Project Number: JSMC063 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC - - - - 1.200 - 1.200 Principal Milestones - - 0.400 - D. Contractor Support Cost - - - - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - 0.400 Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 1.600 - 1.600 Cost Elements FY 2025 FY 2026 A. Construction Cost - B. Equipment Cost - C. Equipment Installation Cost ($ in Millions) FY 2027 Total - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO Project Number Month & Year Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $1.600 million supports the procurement and installation of new Abrams hull & turret assembly equipment located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. This project includes equipment to assemble sub-assemblies, hulls, turrets, and vehicles in a bay-build environment in B266. This equipment provides the capability which will be instrumental in the assembly of modernized Abrams vehicles. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 26 of 56 P-1 Line #32 Volume 1 - 200 === page 231 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Upgrade Fire Suppression System Project Number: JSMC064 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost - - - - - D. Contractor Support Cost - 1.000 - - - E. Corps of Engineers Support Cost - 0.200 - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost - 1.200 - - - Cost Elements ($ in Millions) Month & Year Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2026 Base procurement dollars estimated in the amount of $1.200 million supports an engineering assessment of the fire suppression systems across the entire installation located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. The project will document existing system configurations, perform NFPA 25 sprinkler assessments, and develop updated as-built drawings for all systems. Identified deficiencies will be compiled into a proposal to restore full code compliance. The age of existing fire suppression systems is approaching or exceeding 50 years old and at the end of their service life, which is causing increasing failures and repairs throughout the facility. The inspections will help to determine the hydraulic capabilities, sprinkler head ages, and identify whether the remaining life expectancy warrants full system replacement. This project will decrease leaks, potential failures, decrease downtime on production, and update systems when the replacement is completed. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 27 of 56 P-1 Line #32 Volume 1 - 201 === page 232 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Engine Dynamometer Project Number: JSMC065 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC - - - - 6.000 - 6.000 Principal Milestones - - 2.000 - D. Contractor Support Cost - - 1.000 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - 2.000 Concept Design Complete: 1.000 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 9.000 - 9.000 Cost Elements FY 2025 FY 2026 A. Construction Cost - B. Equipment Cost - C. Equipment Installation Cost ($ in Millions) FY 2027 Total - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO Project Number Month & Year Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $9.000 million supports the procurement and installation of a new Abrams engine dynamometer located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. The engine dynamometer is essential in the production of ground combat vehicles to accurately test and validate the performance, reliability, and efficiency of engines before they are installed in the vehicles. Simulating real-world operating conditions ensures that only engines meeting strict quality standards move forward in the manufacturing process, reducing the risk of costly failures and recalls. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 28 of 56 P-1 Line #32 Volume 1 - 202 === page 233 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Production Vehicle Battery Storage Project Number: JSMC066 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC FY 2027 Total FY 2025 FY 2026 A. Construction Cost - - 4.000 - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH 4.000 Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - 4.750 - 4.750 Principal Milestones C. Equipment Installation Cost - - 2.000 - D. Contractor Support Cost - - 1.000 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - 2.000 Concept Design Complete: 1.000 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 11.750 - 11.750 Cost Elements ($ in Millions) Project Number Month & Year Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $11.750 million supports the design and installation of Abrams production battery storage area located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. A dedicated storage building for batteries is necessary to safely house and protect batteries from environmental factors such as temperature extremes, moisture, and physical damage, which can compromise their performance and lifespan. Proper storage mitigates safety risks by providing secure containment, fire protection, and regulatory compliance for handling potentially hazardous materials. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 29 of 56 P-1 Line #32 Volume 1 - 203 === page 234 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Boresight Equipment Upgrades Project Number: JSMC067 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC - - - - 2.500 - - - - - D. Contractor Support Cost - - 0.500 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - Concept Design Complete: 0.500 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 3.000 - 3.000 Cost Elements FY 2025 FY 2026 A. Construction Cost - B. Equipment Cost - C. Equipment Installation Cost ($ in Millions) FY 2027 Total - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO 2.500 Principal Milestones Month & Year - Project Number Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $3.000 million supports upgrades to boresight equipment for the Abrams tank production line located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. Boresight equipment ensures the precise alignment of optical or electronic targeting systems with the mechanical axis of equipment, such as weapons or sensors. This accuracy is critical to guarantee that targeting, measurement, or guidance systems function correctly and meet quality and performance standards before deployment. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 30 of 56 P-1 Line #32 Volume 1 - 204 === page 235 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Turret Loader Test Stand Project Number: JSMC068 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC - - - - 2.500 - - - - - D. Contractor Support Cost - - 0.500 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - Concept Design Complete: 0.500 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 3.000 - 3.000 Cost Elements FY 2025 FY 2026 A. Construction Cost - B. Equipment Cost - C. Equipment Installation Cost ($ in Millions) FY 2027 Total - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO 2.500 Principal Milestones Month & Year - Project Number Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $3.000 million supports the procurement and installation of turret loader test stand equipment for the Abrams tank production line located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. A turret loader test stand simulates operational conditions and thoroughly tests the functionality, reliability, and safety of turret loading mechanisms before integration into vehicles or systems. This ensures that any issues are identified and resolved early, reducing the risk of malfunctions in the field and maintaining high production quality standards. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 31 of 56 P-1 Line #32 Volume 1 - 205 === page 236 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Assembly Line Modernization Project Number: JSMC069 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC - - - - 20.000 - 20.000 Principal Milestones - - 3.000 - D. Contractor Support Cost - - 3.000 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - 3.000 Concept Design Complete: 3.000 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 26.000 - 26.000 Cost Elements FY 2025 FY 2026 A. Construction Cost - B. Equipment Cost - C. Equipment Installation Cost ($ in Millions) FY 2027 Total - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO Project Number Month & Year Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $26.000 million supports the modernization of the Abrams tank production line located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. Assembly line modernization incorporates advanced automation, improved ergonomics, advanced material flow, and digital monitoring to increase production efficiency and product quality. Upgrading equipment and processes reduces downtime, enhances worker safety, and enables faster adaptation to new product designs or changing customer demands. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 32 of 56 P-1 Line #32 Volume 1 - 206 === page 237 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: New Equipment - A-dock Reinforcement Project Number: JSMC070 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC - - - - 7.500 - 7.500 Principal Milestones - - 5.000 - D. Contractor Support Cost - - 2.500 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - 5.000 Concept Design Complete: 2.500 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 15.000 - 15.000 Cost Elements FY 2025 FY 2026 A. Construction Cost - B. Equipment Cost - C. Equipment Installation Cost ($ in Millions) FY 2027 Total - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO Project Number Month & Year Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $15.000 million supports the reinforcement of the A-dock and modernization of production equipment for the Abrams tank production line located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. A-dock structural reinforcement strengthens the existing area to support heavier loads and enhance safety during material handling operations. Procuring new equipment for this area, such as a waterjet, plasma, and oxy cutters, increases fabrication capabilities by enabling precise cutting of various materials which improves production speed and expands the range of possible manufacturing processes. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 33 of 56 P-1 Line #32 Volume 1 - 207 === page 238 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Production Equipment & Process Modernization Project Number: JSMC071 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC - - - - 25.000 - 25.000 Principal Milestones - - 2.000 - D. Contractor Support Cost - - 4.000 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - 2.000 Concept Design Complete: 4.000 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 31.000 - 31.000 Cost Elements FY 2025 FY 2026 A. Construction Cost - B. Equipment Cost - C. Equipment Installation Cost ($ in Millions) FY 2027 Total - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO Project Number Month & Year Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $31.000 million supports modernization of production equipment and process improvements for the Abrams tank production line located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. Production Equipment & Process Modernization involves upgrading or replacing existing machinery, tools, and manufacturing processes with newer, more advanced technologies and methods. This initiative aims to improve efficiency, product quality, safety, and competitiveness by leveraging automation, digital controls, and best practices in modern manufacturing. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 34 of 56 P-1 Line #32 Volume 1 - 208 === page 239 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Small Parts Paint line Project Number: JSMC072 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC - - - - 14.000 - 14.000 Principal Milestones - - 2.000 - D. Contractor Support Cost - - 2.400 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - 2.000 Concept Design Complete: 2.400 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 18.400 - 18.400 Cost Elements FY 2025 FY 2026 A. Construction Cost - B. Equipment Cost - C. Equipment Installation Cost ($ in Millions) FY 2027 Total - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO Project Number Month & Year Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $18.400 million supports upgrades for the small parts paint line located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. The replacement of the small parts paint line allows for efficient, high-quality coating of smaller components, improving throughput and consistency while reducing manual handling. This dedicated line enhances production flexibility and ensures that small parts meet stringent finish and durability requirements. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 35 of 56 P-1 Line #32 Volume 1 - 209 === page 240 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Site Concrete Replacement Project Number: JSMC073 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost - - - - - D. Contractor Support Cost - - 5.000 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - Concept Design Complete: 5.000 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 5.000 - 5.000 Cost Elements ($ in Millions) Project Number Month & Year Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $5.000 million supports replacement of concrete located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. Site concrete replacement involves removing and replacing deteriorated, or damaged, concrete surfaces to restore structural integrity and protection. This project improves the durability and appearance of walkways, loading areas, and other high-traffic zones ensuring a safer and more reliable working environment. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 36 of 56 P-1 Line #32 Volume 1 - 210 === page 241 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Perimeter Fence Outfall Repairs & Storm Water Drainage Improvements Project Number: JSMC074 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost - - - - - D. Contractor Support Cost - - 1.500 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - Concept Design Complete: 1.500 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 1.500 - 1.500 Cost Elements ($ in Millions) Project Number Month & Year Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $1.500 million supports improving and repairing the perimeter fence outfalls and storm water drainage improvements located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. Perimeter fence outfall repairs and storm water drainage improvements address issues with water flow and erosion along the facility's boundaries. These upgrades help prevent flooding, protect infrastructure, its foundation, and ensure compliance with environmental regulations by directing storm water away from critical areas. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 37 of 56 P-1 Line #32 Volume 1 - 211 === page 242 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Scanning Equipment Project Number: JSMC075 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC - - - - 2.500 - - - - - D. Contractor Support Cost - - 0.500 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - Concept Design Complete: 0.500 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 3.000 - 3.000 Cost Elements FY 2025 FY 2026 A. Construction Cost - B. Equipment Cost - C. Equipment Installation Cost ($ in Millions) FY 2027 Total - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO 2.500 Principal Milestones Month & Year - Project Number Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $3.000 million supports the procurement and installation of scanning equipment for the Abrams tank production line located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. Inspection scanning equipment is required to rapidly and accurately assess components and assemblies for defects, dimensional accuracy, and quality compliance without manual intervention. This automated technology enhances quality control, reduces human error, and ensures that only products meeting stringent quality standards proceed through the manufacturing process. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 38 of 56 P-1 Line #32 Volume 1 - 212 === page 243 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Blast Booth Upgrades Project Number: JSMC076 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC - - - - 1.500 - - - - - D. Contractor Support Cost - - 0.500 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - Concept Design Complete: 0.500 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 2.000 - 2.000 Cost Elements FY 2025 FY 2026 A. Construction Cost - B. Equipment Cost - C. Equipment Installation Cost ($ in Millions) FY 2027 Total - Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH Facility Type (GOGO, GOCO, COCO): GOCO 1.500 Principal Milestones Month & Year - Project Number Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $2.000 million supports blast booth upgrades for the Abrams tank production line located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. Upgrades to the blast booth are necessary to safely process titanium, which generates highly flammable dust and is sensitive to contamination. Improvements include enhanced dust collection, fire suppression systems, and the use of non-ferrous abrasives and booth materials to prevent reactivity and ensure product quality. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 39 of 56 P-1 Line #32 Volume 1 - 213 === page 244 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: B186 Shipping/Receiving Docks Project Number: JSMC077 Project Category: End Item Supported Model: Abrams Cost Elements Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC FY 2027 Total Facility Name: Joint Systems Manufacturing Center (JSMC) - Lima Facility Location: Lima, OH 2.600 Facility Type (GOGO, GOCO, COCO): GOCO FY 2025 FY 2026 A. Construction Cost - - 2.600 - B. Equipment Cost - - - - - C. Equipment Installation Cost - - - - - D. Contractor Support Cost - - 1.000 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - Concept Design Complete: 1.000 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 3.600 - 3.600 ($ in Millions) Principal Milestones Project Number Month & Year Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $3.600 million supports the addition of shipping docks in Building 186 located at the Joint Systems Manufacturing Center (JSMC) - Lima, OH. The addition of shipping docks in B186 will enable more efficient flow of material and kits by reducing bottlenecks and wait times during loading and unloading. This improvement supports higher throughput, streamlines logistics operations, and enhances overall productivity in the facility. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 40 of 56 P-1 Line #32 Volume 1 - 214 === page 245 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: JMTC Miscellaneous Small Projects Project Number: JMTC006 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Rock Island Arsenal - Joint Manufacturing and Technology Center (RIA-JTMC) Facility Location: Rock Island, IL Facility Type (GOGO, GOCO, COCO): GOGO B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost 1.000 - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost 1.000 - - - - Cost Elements ($ in Millions) Month & Year Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2025 Base procurement dollars in the amount of $1.000 million to support the Abrams Tank Production Process and Abrams Industrial Base by focusing on the modernization, maintenance, replacement, and upgrade of production equipment and production support equipment facilities located at Rock Island Arsenal Joint Manufacturing and Technology Center (RIA-JMTC) - Rock Island, IL. This includes multiple projects which are individually estimated at less than $1.000 million and will facilitate small miscellaneous projects in support of RIA-JMTC melt furnace updates. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 41 of 56 P-1 Line #32 Volume 1 - 215 === page 246 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Coreless Induction Furnace Project Number: JMTC012 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Rock Island Arsenal - Joint Manufacturing and Technology Center (RIA-JTMC) Facility Location: Rock Island, IL Facility Type (GOGO, GOCO, COCO): GOGO B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost 2.300 - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost 2.300 - - - - Cost Elements ($ in Millions) Month & Year Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2025 Base procurement dollars in the amount of $2.300 million to replace and update two (2) banks of three (3) 1,000 pound coreless induction furnaces, totaling six (6), located at Rock Island Arsenal Joint Manufacturing and Technology Center (RIA-JMTC) - Rock Island, IL. This action replaces two (2) existing banks of smaller induction furnaces, one of which has no power today. This 'Greener' system consumes less energy than legacy furnaces and establishes independent steel and aluminum melting lines. Modern furnace power supplies will enable the flexibility for multiple furnaces to be in operation at the same time resulting in greater melt capacity and serve as a redundant capability during both scheduled and unscheduled maintenance. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 42 of 56 P-1 Line #32 Volume 1 - 216 === page 247 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Melt Furnace With Advanced Refinement Project Number: JMTC013 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Rock Island Arsenal - Joint Manufacturing and Technology Center (RIA-JTMC) Facility Location: Rock Island, IL Facility Type (GOGO, GOCO, COCO): GOGO B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost 10.300 - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost 10.300 - - - - Cost Elements ($ in Millions) Month & Year Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2025 Base procurement dollars in the amount of $10.300 million support the procurement and installation of a one for one replacement of current 3T & 5T arc furnaces with 'greener' energy efficient coreless induction furnaces located at Rock Island Arsenal Joint Manufacturing and Technology Center (RIA-JMTC) - Rock Island, IL. Argon Oxygen Decarburization (AOD) enables metal refinement to cast alloys such as stainless steel, cast armor steel, and high yield (HY) steels. This modernization effort secures a large casting production line and improves process control for a historically manual alloying process. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 43 of 56 P-1 Line #32 Volume 1 - 217 === page 248 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: High-Bays Design Project Number: SANG002 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Selfridge Air National Guard (SANG) Base Facility Location: Harrison Township, MI Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Cost Elements ($ in Millions) D. Contractor Support Cost - - - - - 4.500 - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Total Project Cost 4.500 - - - - E. Corps of Engineers Support Cost Month & Year Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2025 Base procurement dollars in the amount of $4.500 million supports the design for the planned manufacturing of high-bays for Abrams Modernization located at Selfridge Air National Guard (SANG) Base, Harrison Township, MI. This project is to develop a design plan for the proposed building and property. Building construction is planned to begin in FY28. Project Manager (PM) Abrams requires an Operational Security (OPSEC) Government-Owned, Contractor-Operated (GOCO) high-bay facility with dedicated secret and above secret clearance areas for personnel and vehicles, independent of the Original Equipment Manufacturers (OEMs). The facility's primary mission would be supporting production through software and selected hardware installs. In addition, this facility could be used for Engineering Change Proposal (ECP) development, prototyping activities, vehicle integration activities, dedicated Software Integration Lab (SIL) and Hardware Integration Lab (HIL), and government logistics mission support. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 44 of 56 P-1 Line #32 Volume 1 - 218 === page 249 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: High-Bays Site Preparation Project Number: SANG003 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost 3.000 - - - - Facility Name: Selfridge Air National Guard (SANG) Base Facility Location: Harrison Township, MI Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost - - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost 3.000 - - - - Cost Elements ($ in Millions) FY 2025 Month & Year Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2025 Base procurement dollars in the amount of $3.000 million supports the site preparation work for the planned manufacturing of high-bays for Abrams Modernization located at Selfridge Air National Guard (SANG) Base, Harrison Township, MI. This project is to prepare the site at SANG for the proposed building and property. Building construction is planned to begin in FY28. Project Manager (PM) Abrams requires an Operational Security (OPSEC) Government-Owned, Contractor-Operated (GOCO) high-bay facility with dedicated secret and above secret clearance areas for personnel and vehicles, independent of the Original Equipment Manufacturers (OEMs). The facility's primary mission would be supporting production through software and selected hardware installs. In addition, this facility could be used for Engineering Change Proposal (ECP) development, prototyping activities, vehicle integration activities, dedicated Software Integration Lab (SIL) and Hardware Integration Lab (HIL), and government logistics mission support. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 45 of 56 P-1 Line #32 Volume 1 - 219 === page 250 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: WVA Miscellaneous Small Projects Project Number: WVA0027 Project Category: End Item Supported Model: Abrams Cost Elements ($ in Millions) Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - B. Equipment Cost 0.201 2.700 1.000 - - C. Equipment Installation Cost 1.000 - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Total Project Cost 1.201 2.700 1.000 - 1.000 Facility Name: Watervliet Arsenal (WVA) Facility Location: Watervliet, NY Facility Type (GOGO, GOCO, COCO): GOGO 1.000 Principal Milestones Month & Year Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $1.000 million to support the modernization, maintenance, replacement, and upgrade of production equipment and production support equipment located at Watervliet Arsenal (WVA), New York. These projects include but are not limited to: maintaining, improving, optimizing, and modernizing the manufacturing facilities, its infrastructure, the production equipment, and production support equipment. This includes multiple projects which are individually estimated at less than $1.000 million. If one of these miscellaneous small projects cost increases to over $1.000 million due to supply chain, inflation, or other factors, the Project Manager (PM) will execute and provide documentation within 60 days. FY 2026 Base procurement dollars estimated in the amount of $2.700 million to support the modernization, maintenance, replacement, and upgrade of production equipment and production support equipment located at Watervliet Arsenal (WVA), New York. These projects include but are not limited to: maintaining, improving, optimizing, and modernizing the manufacturing facilities, its infrastructure, the production equipment, and production support equipment. This includes multiple projects which are individually estimated at less than $1.000 million. FY 2025 Base procurement dollars in the amount of $1.000 million to support the modernization, maintenance, replacement, and upgrade of production equipment and production support equipment located at Watervliet Arsenal (WVA), New York. These projects include but are not limited to: maintaining, improving, optimizing, and modernizing the manufacturing facilities, its infrastructure, the production equipment, and production support equipment. This includes multiple projects which are individually estimated at less than $1.000 million. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 46 of 56 P-1 Line #32 Volume 1 - 220 === page 251 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: WVA Miscellaneous Small Projects Project Number: WVA0027 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2025 Base procurement dollars in the amount of $0.201 million to purchase miscellaneous tooling/equipment to support manufacturing of cannon tubes located at Watervliet Arsenal (WVA), New York. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 47 of 56 P-1 Line #32 Volume 1 - 221 === page 252 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Tri-Chrome Conversion Project Number: WVA0055 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Watervliet Arsenal (WVA) Facility Location: Watervliet, NY Facility Type (GOGO, GOCO, COCO): GOGO B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost - - - - - D. Contractor Support Cost - 6.540 1.250 - E. Corps of Engineers Support Cost - - - - Cost Elements ($ in Millions) Month & Year - 1.460 - - G. Total Facility Project Cost 2.200 - - - H. Other Costs 0.500 - - - Concept Design Complete: 1.250 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost 2.700 8.000 1.250 - 1.250 F. Other In-House Support Cost Project Number Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $1.250 million supports the conversion of the Chrome plating tanks currently not in use to an operational condition and filling with Trivalent Chrome (CrIL3) located at Watervliet Arsenal (WVA), New York. This set of plating tanks will be used to qualify Trivalent Chrome cannon bore plating at WVA. This conversion is a risk reduction measure being performed in conjunction with the larger U.S. Army Tank Automotive and Armaments Command (TACOM) sponsored repair of the Watervliet cannon bore Chrome Plating facility. The Army directed conversion to Trivalent chrome requires the development of new tooling and plating techniques to achieve equal-to or better-than performance compared to existing Hexavalent Chrome (Cr6). The conversion of these tanks allows full length plating of cannon bores with Trivalent chrome while the repaired plating facility continues using Hexavalent Chrome. Multiple cannon tubes will be coated and subjected to live fire and laboratory testing as part of this effort. This plating facility may have future utility in the production of other howitzers, tank cannons, and weapons. FY 2026 Base procurement dollars estimated in the amount of $8.000 million supports the conversion of not currently-in-use Chrome plating tanks to operational condition and filling with Trivalent Chrome (CrIL3) located at Watervliet Arsenal (WVA), New York. This set of plating tanks will be used to qualify Trivalent Chrome cannon bore plating at WVA. This conversion is a risk reduction measure being performed in conjunction with the larger U.S. Army Tank Automotive and Armaments Command (TACOM) sponsored repair of the Watervliet cannon bore Chrome Plating facility. FY 2025 Base procurement dollars in the amount of $2.700 million supports the conversion of not currently-in-use Chrome plating tanks to operational condition and filling with Trivalent Chrome (CrIL3) located at Watervliet Arsenal (WVA), New York. This set of plating tanks will be used to qualify Trivalent Chrome cannon bore plating LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 48 of 56 P-1 Line #32 Volume 1 - 222 === page 253 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Tri-Chrome Conversion Project Number: WVA0055 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / at WVA. This conversion is a risk reduction measure being performed in conjunction with the larger U.S. Army Tank Automotive and Armaments Command (TACOM) sponsored repair of the Watervliet for cannon bore Chrome Plating facility. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 49 of 56 P-1 Line #32 Volume 1 - 223 === page 254 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Cold Spray Smooth Bore Qualification Project Number: WVA0060 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Watervliet Arsenal (WVA) Facility Location: Watervliet, NY Facility Type (GOGO, GOCO, COCO): GOGO B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost - - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Cost Elements ($ in Millions) F. Other In-House Support Cost 1.000 - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Total Project Cost 1.000 - - - - Month & Year Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2025 Base procurement dollars in the amount of $1.000 million supports the qualification of a second cold spray system located at Watervliet Arsenal (WVA), New York. This will eliminate a single point of failure and increase capacity for the cold spray technology currently being developed. The cold-spray process introduces additional capability for WVA and supports an alternate technology to chrome. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 50 of 56 P-1 Line #32 Volume 1 - 224 === page 255 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: WVA Profile Verification Process (PVP) Replacement Project Number: WVA0061 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Watervliet Arsenal (WVA) Facility Location: Watervliet, NY Facility Type (GOGO, GOCO, COCO): GOGO B. Equipment Cost - 1.190 - - - Principal Milestones C. Equipment Installation Cost - 1.100 - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost - 2.290 - - - Cost Elements ($ in Millions) FY 2025 Month & Year Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2026 Base procurement dollars estimated in the amount of $2.290 million supports the replacement of the Profile Verification Process (PVP) equipment located at Watervliet Arsenal (WVA), New York. This effort is in conjunction with a MANTECH effort to redevelop an improved PVP method and system to modernize the current equipment and processes with more capable and robust versions. The current equipment is antiquated and obsolete with non-precision components and algorithm leading to inaccurate reshaping of cannon tubes. The new equipment will be fully autonomous with an automated measurement system utilizing advanced sensors and precision fixturing, advanced monitoring, and control algorithms adaptable to various materials including next generation cannons and advanced materials. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 51 of 56 P-1 Line #32 Volume 1 - 225 === page 256 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Mill Turn 6600NT Project Number: WVA0062 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Watervliet Arsenal (WVA) Facility Location: Watervliet, NY Facility Type (GOGO, GOCO, COCO): GOGO B. Equipment Cost - 4.000 - - - Principal Milestones C. Equipment Installation Cost - 0.950 - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost - 4.950 - - - Cost Elements ($ in Millions) FY 2025 Month & Year Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2026 Base procurement dollars estimated in the amount of $4.950 million supports the purchase and installation of Mill Turn 6600NT equipment located at Watervliet Arsenal (WVA), New York. Mill Turn system allows the Watervliet Arsenal to perform multiple cannon tube operations consecutively without requiring the workpiece to move to a different machine. The machines can perform finished milling and turning operations in one continuous process. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 52 of 56 P-1 Line #32 Volume 1 - 226 === page 257 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Forge Mandrel Option Project Number: WVA0063 Project Category: End Item Supported Model: Abrams Annual Capacity Before / After (1-8-5): / FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Watervliet Arsenal (WVA) Facility Location: Watervliet, NY Facility Type (GOGO, GOCO, COCO): GOGO B. Equipment Cost - 3.500 - - - Principal Milestones C. Equipment Installation Cost - - - - - D. Contractor Support Cost - 0.500 - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost - 4.000 - - - Cost Elements ($ in Millions) FY 2025 Month & Year Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2026 Base procurement dollars estimated in the amount of $4.000 million supports the procurement and installation of cannon tube forge mandrel equipment located at Watervliet Arsenal (WVA), New York. This additional mandrel system improves gun barrel forging process flexibility to combine short and long mandrel forging in a single heating step for larger calibers (120+ mm), which improves productivity, performance, and quality. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 53 of 56 P-1 Line #32 Volume 1 - 227 === page 258 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: Expansion of Deprocessing Site Project Number: ANAD End Item Supported Model: AMPV Cost Elements ($ in Millions) Project Category: Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Facility Name: AMPV Anniston Deprocessing Site Facility Location: Anniston, AL 1.000 Facility Type (GOGO, GOCO, COCO): GOGO A. Construction Cost 10.000 - 1.000 - B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost - - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost 10.000 - 1.000 - 1.000 Month & Year Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars estimated in the amount of $1.000 million supports the expansion of deprocessing site throughput for fielding of AMPVs. This will facilitate expansion of AMPV's deprocessing center at Anniston Army Depot. These projects include but are not limited to: modernizing, maintaining, improving, and optimizing real property at the deprocessing facilities, its infrastructure, and production support equipment for the duration of AMPV's fielding requirement. This project is a FY 2027 new start. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 54 of 56 P-1 Line #32 Volume 1 - 228 === page 259 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: M88 Hull Tech Data Project Number: BAE002 Project Category: End Item Supported Model: CRS/M88 Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: BAE Systems Vehicle Upgrade and Overhaul Center (VUOC) Facility Location: Various Facility Type (GOGO, GOCO, COCO): B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost - - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs 18.737 - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost 18.737 - - - - Cost Elements ($ in Millions) Month & Year Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2025 Base procurement dollars in the amount of $18.737 million supports obtaining technical data required for engineering, fabrication, and qualification of the M88 hull at the BAE Systems facilities in Sterling Heights, MI; Anniston, AL; York, PA; and partnered casting supplier's facilities. Projects include reverse engineering of M88 hull, Technical Data Package (TDP) development, mold design, procuring raw materials, machining, weld, hull assembly, and process qualification. The Army is running out of seed candidates for re-manufacture of M88 and requires new hull structures to meet production needs. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 55 of 56 P-1 Line #32 Volume 1 - 229 === page 260 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2033A / 02 / 30 P-1 Line Item Number / Title: 3270GC0050 / Production Base Support (WOCV-WTCV) Project Title: ATEC Facilities Project Number: ATEC End Item Supported Model: Project Category: Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Army Test and Evaluation Command (ATEC) Facilities Facility Location: Various Facility Type (GOGO, GOCO, COCO): B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost - - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs 3.835 3.875 3.905 - 3.905 Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost 3.835 3.875 3.905 - 3.905 Cost Elements ($ in Millions) Month & Year Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars in the amount of $3.905 million support the Army Test and Evaluation Command priorities at the following locations: - Aberdeen Test Center (ATC) will continue to modernize fire control instrumentation required to assess weapon system fire control performance on a wide range of test items. Aberdeen Test Center will continue replacing and upgrading weapon, sight, and target scoring high-definition video cameras, recorders, digital video processing systems, fiber optic converters, and telemetry systems. Replacement equipment is scheduled to address obsolescence issues, software compatibility gaps, and deterioration of existing hardware while ensuring test equipment maintains pace with technological advances of test items to preclude lack of test support. Aberdeen Test Center will also procure new instrumentation that will allow Electromagnetic Interference (EMI) testing of current and future military platforms, including autonomous vehicles. - White Sands Test Center (WSTC) will continue to maintain and upgrade existing equipment and instrumentation for the developing and evolving White Sands Missile Range (WSMR) directed energy - High-Power Microwave (HPM), Electromagnetic Pulse (EMP) and lightning effects test simulators. These items include sensors, oscilloscopes, fiber optic links, vacuum systems, cryogenic superconducting magnets, waveguides, antennas, cathodes, insulators, and various cabling and subassemblies. These efforts will help White Sands Test Center meet regulatory, customer, and/or evolving mission requirements. - Yuma Test Center (YTC) will acquire upgraded sensors, sensor positioning equipment, control hardware, signal conditioners, and other data acquisition equipment and software to modernize and improve accuracy and efficiency of ballistics data acquisition. LI 3270GC0050 - Production Base Support (WOCV-WTCV) Army UNCLASSIFIED Page 56 of 56 P-1 Line #32 Volume 1 - 230