=== page 1 === UNCLASSIFIED Department of War Fiscal Year (FY) 2027 Budget Estimates April 2026 Army Justification Book Volume 1 of 1 Missile Procurement, Army UNCLASSIFIED === page 2 === === page 3 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Volume 1 Table of Contents Introduction and Explanation of Contents................................................................................................................Volume 1 - ii Comptroller Exhibit P-1..............................................................................................................................................Volume 1 - iv Line Item Table of Contents (by Appropriation then Line Number)..................................................................... Volume 1 - xx Line Item Table of Contents (Alphabetically by Line Item Title)........................................................................ Volume 1 - xxiii Exhibit P-1M, Procurement Programs - Modification Summary......................................................................... Volume 1 - xxv Exhibit P-40s................................................................................................................................................................ Volume 1 - 1 UNCLASSIFIED Volume 1 - i === page 4 === === page 5 === Cost Statement The following Justification Books were prepared at a cost of $337,499.00: Aircraft (ACFT), Missile (MSLS), Weapons & Tracked Combat Vehicles (WTCV), Ammunition (AMMO), Other Procurement Army (OPA) 1 - Tactical & Support Vehicles, Other Procurement Army (OPA) 2 - Communications & Electronics, Other Procurement Army (OPA) 3 & 4 - Other Support Equipment & Spares, Research, Development, Test and Evaluation (RDTE) for: Budget Activity 1, Budget Activity 2, Budget Activity 3, Budget Activity 4A, Budget Activity 4B, Budget Activity 5A, Budget Activity 5B, Budget Activity 5C, Budget Activity 5D, Budget Activity 6, Budget Activity 7 and Budget Activity 8. Volume 1 - ii === page 6 === MISSILE PROCUREMENT, ARMY Appropriation Language For construction, procurement, production, modification, and modernization of Missiles, equipment, including ordnance, spare parts, and accessories therefore; specialized equipment and training devices; expansion of public and private plants, including the land necessary therefore, for the foregoing purposes, and such lands and interests therein, may be acquired, and construction prosecuted thereon prior to approval of title; and procurement and installation of equipment, appliances, and machine tools in public and private plants; reserve plant and government and contractor-owned equipment layaway; and other expenses necessary for the foregoing purposes, $12,130,430,000.00 to remain available for obligation until September 30, 2029. Volume 1 - iii === page 7 === ^=QXVLFME?º @r™fš¯rŒ§º “uº `fœº Gbº 2º S›r¢|or§£º <±owr¨º Eµy}j~§º Tº Y“©f‚º Rkƒxfª}”Œf„º :²§z”œ~§¶º A”aº =”Š–•ŽsŽ«º V´fœ·º   @“ ‡gœ¤º €º Zz”²¢fŽp¢º       Fdº &º ;m­³fˆ¦º Hcº +º @}¥l r¬”Œf¡¹º Jeº +º UPº 7º Hdº  +º ]”®g‰º V™rŒqº UƒgŽº E’fn§roº  !   !  !   ! [”©h†º Bt—i°r§º ”vº §{rº ;Ÿ‹¸º 0#'.6$º 162,!º -5(86º 2 8*8 6.º Kœf‘qº \”©f‡º Cr˜gžª‹rާº ”uº afŸº 2 %&+ 6#º 2 63+"º +2 )86º 4 9*86/º TU`=« ‚v2 ‚>i?p“« ƒj§« $P@« '« !« ”w•(a« L)„« k*n8+–x ¨« †Ay¡‡3B‘« Vo« QC« z&« ¢9NDž« g€Ep:W¦« M{ˆ« —RF« X‘‘YbG« "‰|4£ŠClFqŸ« h‹m© « ,56}¤r˜« Z’« ¥s;HŒ‘™-šI<« /ª«  « 0[cd\~t 7ŽK6›« œw.e« ]«  « 1^fe_wu « %SJ« #-OC« _>QWWNIOEDº Volume 1 - iv === page 8 === Volume 1 - v === page 9 === Volume 1 - vi === page 10 === Volume 1 - vii === page 11 === Volume 1 - viii === page 12 === Volume 1 - ix === page 13 === Volume 1 - x === page 14 === Volume 1 - xi === page 15 === Volume 1 - xii === page 16 === Volume 1 - xiii === page 17 === Volume 1 - xiv === page 18 === Volume 1 - xv === page 19 === Volume 1 - xvi === page 20 === Volume 1 - xvii === page 21 === Executive Summary for Missiles Procurement, Army Table 1: Funding Overview Discretionary FY 2025 ($K) FY 2026 ($K) $7,456,184 $7,287,263 $12,130,430 $0 $672,598 $24,483,244 $7,456,184 $7,959,861 $36,613,674 Mandatory Total FY 2027 ($K) Table 2: Detailed Mandatory Breakout BLI Reconciliation Bin Title FY 2025 ($K) FY 2026 ($K) 2611C72100 Munitions and Defense Supply Chain Resiliency $0 $113,932 $0 9214C81200 Munitions and Defense Supply Chain Resiliency $0 $0 $2,331,282 8260C53101 Munitions and Defense Supply Chain Resiliency $0 $200,000 $10,931,919 8082C14300 Munitions and Defense Supply Chain Resiliency $0 $80,850 $0 8540C29600 Munitions and Defense Supply Chain Resiliency $0 $277,816 $692,000 8046C20200 Munitions and Defense Supply Chain Resiliency $0 $170,000 10,528,043 $0 $672,598 $24,483,244 Mandatory Total FY 2027 ($K) MANDATORY FUNDING JUSTIFICATION: The FY 2027 request for Missiles Procurement, Army includes $12,130,430 thousand of discretionary and $24,483,244 thousand of mandatory for a total of $36,613,674. Volume 1 - xviii === page 22 === The FY 2027 request for Mid-Range Capability (MRC) includes $370,351 thousand of discretionary and $2,331,282 thousand of mandatory for a total of $2,701,633 thousand. The mandatory funds for MRC procures a total of 234 Tomahawk missiles and 110 SM6 missiles to support Munitions Acceleration Council (MAC) expanded production rate. The FY 2027 request for MSE Missile includes $1,297,528 thousand of discretionary and $10,931,919 thousand of mandatory for a total of $12,229,447 thousand. The mandatory funds for MSE procure a total of 2,554 MSE missiles to support Munitions Acceleration Council (MAC) expanded production rate. The FY 2027 request for Precision Strike Missile (PrSM) includes $1,226,526 thousand of discretionary and $692,000 thousand of mandatory for a total of $1,918,526 thousand. The mandatory funds for PrSM procures 454 PrSM missiles to support Munitions Acceleration Council (MAC) expanded production rate. The FY 2027 request for Thermal High Altitude Area Defense (THAAD) includes $907,162 thousand of discretionary and $10,528,043 thousand of mandatory for a total of $11,435,205 thousand. The mandatory funds for THAAD procures a total of 830 THAAD missiles to support Munitions Acceleration Council (MAC) expanded production rate. The FY 2026 spend plan amount for Missiles Procurement, Army includes $7,287,263 thousand of discretionary and $672,598 thousand of mandatory (reconciliation) for a total of $7,959,861 thousand. Volume 1 - xix === page 23 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (by Appropriation then Line Number) Appropriation 2032A: Missile Procurement, Army Line # BA BSA Line Item Number Line Item Title Page 1 02 10 7265C12000 Lower Tier Air and Missile Defense (AMD) Sensor...............................................................................Volume 1 - 1 2 02 10 8046C20200 TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD).................................................................. Volume 1 - 12 3 02 10 8082C14300 M-SHORAD - Procurement..................................................................................................................Volume 1 - 21 4 02 10 8260C53101 MSE Missile......................................................................................................................................... Volume 1 - 34 5 02 10 8540C29600 PRECISION STRIKE MISSILE (PRSM).............................................................................................. Volume 1 - 45 6 02 10 8930C61001 INDIRECT FIRE PROTECTION CAPABILITY INC 2-I........................................................................ Volume 1 - 64 7 02 10 9214C81200 MID-RANGE CAPABILITY (MRC)....................................................................................................... Volume 1 - 81 8 02 10 9216C82200 COUNTER SMALL UNMANNED AERIAL SYSTEM INTERCEPT.................................................... Volume 1 - 104 9 02 20 2605C70302 Joint Air-to-Ground MSLS (JAGM).................................................................................................... Volume 1 - 106 11 02 20 2611C72100 LONG-RANGE HYPERSONIC WEAPON......................................................................................... Volume 1 - 116 12 02 30 0648CC0007 Javelin (AAWS-M) System Summary................................................................................................ Volume 1 - 127 13 02 30 2104C59300 TOW 2 System Summary.................................................................................................................. Volume 1 - 150 14 02 30 6005C64400 Guided MLRS Rocket (GMLRS)........................................................................................................Volume 1 - 151 15 02 30 6005C64400 Guided MLRS Rocket (GMLRS), Advance Procurement.................................................................. Volume 1 - 180 16 02 30 6060C65405 MLRS Reduced Range Practice Rockets (RRPR)............................................................................ Volume 1 - 190 17 02 30 6200C02901 High Mobility Artillery Rocket System (HIMARS)...............................................................................Volume 1 - 195 UNCLASSIFIED Volume 1 - xx === page 24 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Appropriation 2032A: Missile Procurement, Army Line # BA BSA Line Item Number Line Item Title Page 18 02 30 6472C98510 ARMY TACTICAL MSL SYS (ATACMS) - SYS SUM....................................................................... Volume 1 - 207 19 02 30 6870C88001 LETHAL MINIATURE AERIAL MISSILE SYSTEM (LMAMS)............................................................Volume 1 - 208 20 02 30 6872C91500 FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS.................................................................... Volume 1 - 209 Appropriation 2032A: Missile Procurement, Army Line # BA BSA Line Item Number Line Item Title Page 21 03 10 0962C50700 Patriot Mods....................................................................................................................................... Volume 1 - 223 22 03 10 2684C20000 Stinger Mods...................................................................................................................................... Volume 1 - 265 23 03 10 2690CE8710 AVENGER MODS..............................................................................................................................Volume 1 - 272 24 03 10 6552C67500 MLRS Mods....................................................................................................................................... Volume 1 - 285 25 03 10 6580C67501 HIMARS Modifications....................................................................................................................... Volume 1 - 298 UNCLASSIFIED Volume 1 - xxi === page 25 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Appropriation 2032A: Missile Procurement, Army Line # BA BSA Line Item Number Line Item Title 26 04 10 Spares And Repair Parts...................................................................................................................Volume 1 - 308 1242CA0250 Page Appropriation 2032A: Missile Procurement, Army Line # BA BSA Line Item Number Line Item Title 27 05 10 Air Defense Targets........................................................................................................................... Volume 1 - 311 1242C93000 Page UNCLASSIFIED Volume 1 - xxii === page 26 === === page 27 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (Alphabetically by Line Item Title) Line Item Title Line Item Number Line # BA BSA Page ARMY TACTICAL MSL SYS (ATACMS) - SYS SUM 6472C98510 18 02 30................... Volume 1 - 207 AVENGER MODS 2690CE8710 23 03 10................... Volume 1 - 272 Air Defense Targets 1242C93000 27 05 10................... Volume 1 - 311 COUNTER SMALL UNMANNED AERIAL SYSTEM INTERCEPT 9216C82200 8 02 10................... Volume 1 - 104 FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS 6872C91500 20 02 30................... Volume 1 - 209 Guided MLRS Rocket (GMLRS) 6005C64400 14 02 30................... Volume 1 - 151 Guided MLRS Rocket (GMLRS), Advance Procurement 6005C64400 15 02 30................... Volume 1 - 180 HIMARS Modifications 6580C67501 25 03 10................... Volume 1 - 298 High Mobility Artillery Rocket System (HIMARS) 6200C02901 17 02 30................... Volume 1 - 195 INDIRECT FIRE PROTECTION CAPABILITY INC 2-I 8930C61001 6 02 10..................... Volume 1 - 64 Javelin (AAWS-M) System Summary 0648CC0007 12 02 30................... Volume 1 - 127 Joint Air-to-Ground MSLS (JAGM) 2605C70302 9 02 20................... Volume 1 - 106 LETHAL MINIATURE AERIAL MISSILE SYSTEM (LMAMS) 6870C88001 19 02 30................... Volume 1 - 208 LONG-RANGE HYPERSONIC WEAPON 2611C72100 11 02 20................... Volume 1 - 116 Lower Tier Air and Missile Defense (AMD) Sensor 7265C12000 1 02 10....................... Volume 1 - 1 M-SHORAD - Procurement 8082C14300 3 02 10..................... Volume 1 - 21 MID-RANGE CAPABILITY (MRC) 9214C81200 7 02 10..................... Volume 1 - 81 UNCLASSIFIED Volume 1 - xxiii === page 28 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page MLRS Mods 6552C67500 24 03 10................... Volume 1 - 285 MLRS Reduced Range Practice Rockets (RRPR) 6060C65405 16 02 30................... Volume 1 - 190 MSE Missile 8260C53101 4 02 10..................... Volume 1 - 34 PRECISION STRIKE MISSILE (PRSM) 8540C29600 5 02 10..................... Volume 1 - 45 Patriot Mods 0962C50700 21 03 10................... Volume 1 - 223 Spares And Repair Parts 1242CA0250 26 04 10................... Volume 1 - 308 Stinger Mods 2684C20000 22 03 10................... Volume 1 - 265 TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD) 8046C20200 2 02 10..................... Volume 1 - 12 TOW 2 System Summary 2104C59300 13 02 30................... Volume 1 - 150 UNCLASSIFIED Volume 1 - xxiv === page 29 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Exhibit P-1M, Procurement Programs - Modification Summary (Listing by Model) Lookup Matrix by Model Model: Various P-3a Individual Modifications Modification Number C50700 Modification Title Patriot Mods Applies to Multiple Models No Model: FIM-92E Stinger Block I Missile P-3a Individual Modifications Modification Number C21300 Modification Title STINGER BLK I UPGRADES Applies to Multiple Models No Model: Avenger Basic and Slew-to-Cue Systems P-3a Individual Modifications Modification Number CE8710 Modification Title AVENGER MODS Applies to Multiple Models No Model: M270A1 P-3a Individual Modifications Modification Number C67500 Modification Title MLRS Mods Applies to Multiple Models No Model: M142 High Mobility Artillery Rocket System P-3a Individual Modifications Modification Number C67501 Modification Title HIMARS Modifications Applies to Multiple Models No UNCLASSIFIED Exhibit P-1M, Procurement Programs - Modification Summary Page 1 of 1 Volume 1 - xxv === page 30 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Exhibit P-1M, Procurement Programs - Modification Summary (Funding for Modifications) Funding ($ M) P-3a Modification Title PYS FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 Exhibit P-3a Patriot Mods 6,057.247 171.958 757.800 796.837 - 796.837 574.847 215.159 234.767 225.781 STINGER BLK I UPGRADES 906.780 649.475 428.935 10.786 - 10.786 10.096 4.388 - - AVENGER MODS 254.332 2.321 - 6.823 - 6.823 5.051 5.051 3.010 3.037 2,416.099 320.591 243.470 289.496 - 289.496 289.782 295.560 302.374 - 409.731 49.581 54.005 54.363 - 54.363 99.372 99.860 99.826 155.221 10,044.189 1,193.926 1,484.210 1,158.305 0.000 1,158.305 979.148 620.018 639.977 384.039 MLRS Mods HIMARS Modifications Totals (Total Obligation Authority) Total Obligation Authority UNCLASSIFIED Exhibit P-1M, Procurement Programs - Modification Summary Page 1 of 1 Volume 1 - xxvi === page 31 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 10: Surface-to-Air Missile System ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 7265C12000 / Lower Tier Air and Missile Defense (AMD) Sensor Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 Procurement Quantity (Units in Each) FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 To FY 2031 Complete FY 2030 1 2 4 12 - 12 9 9 10 10 Continuing Gross/Weapon System Cost ($ in Millions) 196.532 387.629 532.427 2,036.358 - 2,036.358 1,500.512 1,485.293 1,541.293 1,552.319 Continuing Less PY Advance Procurement ($ in Millions) 9.200 Net Procurement (P-1) ($ in Millions) 187.332 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 9.200 196.532 - - 387.629 - 532.427 - 2,036.358 - 387.629 - - 532.427 2,036.358 - 2,036.358 - - 2,036.358 - - 1,500.512 - 1,485.293 - 1,541.293 - 1,500.512 - Continuing - 1,552.319 Continuing - 1,485.293 - 1,541.293 Total Continuing 9.200 Continuing - 1,552.319 Continuing 9.200 Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 196,532.000 193,814.500 133,106.750 169,696.500 - 169,696.500 166,723.556 165,032.556 154,129.300 155,231.900 Continuing Continuing Description: The FY 2027 budget request for LTAMDS provides $2,036.358 million for the procurement of twelve (12) Low-Rate Initial Production (LRIP) sensors, ancillary equipment, survivability equipment, required spares packages for each sensor, and will fund initial fielding activities in INDOPACOM region. This funding line is directly aligned to the Army Air and Missile Defense Modernization priority. Lower Tier Air Missile Defense Sensor (LTAMDS) program will provide the required sensing capabilities, surveillance and fire control quality data in the lower tier portion of the Army Integrated Air and Missile Defense (AIAMD) of the ballistic missile defense battlespace. The LTAMDS capability increases sensor/ radar performance to maximize the inherent PATRIOT Advanced Capability (PAC-3) Missile Segment Enhanced (MSE) Interceptor capabilities to engage threats. . Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 2 4 12 - 12 9 9 10 10 387.629 532.427 2,036.358 - 2,036.358 1,500.512 1,485.293 1,541.293 1,552.319 2 4 12 - 12 9 9 10 10 387.629 532.427 2,036.358 - 2,036.358 1,500.512 1,485.293 1,541.293 1,552.319 LI 7265C12000 - Lower Tier Air and Missile Defense (AMD)... Army UNCLASSIFIED Page 1 of 11 P-1 Line #1 Volume 1 - 1 === page 32 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 10: Surface-to-Air Missile System ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 7265C12000 / Lower Tier Air and Missile Defense (AMD) Sensor Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 C12101 / Lower Tier Air and Missile Defense Sensor P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 1 / 196.532 2 / 387.629 4 / 532.427 12 / 2,036.358 - / - 12 / 2,036.358 1 / 196.532 2 / 387.629 4 / 532.427 12 / 2,036.358 - / - 12 / 2,036.358 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 budget request for LTAMDS provides $2,036.358 million for the procurement of twelve (12) Low-Rate Initial Production (LRIP) sensors, ancillary equipment, survivability equipment required spares packages for each sensor and will fund initial fielding activities in INDOPACOM region. The funding increase in FY 2027 base procurement dollars from FY 2026 is due to an increased production quantity, required spares packages, and initial fielding activities in INDOPACOM region. LI 7265C12000 - Lower Tier Air and Missile Defense (AMD)... Army UNCLASSIFIED Page 2 of 11 P-1 Line #1 Volume 1 - 2 === page 33 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 7265C12000 / Lower Tier Air and Missile Defense (AMD) Sensor Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: C12101 / Lower Tier Air and Missile Defense Sensor MDAP/MAIS Code: Resource Summary Prior Years FY 2025 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) FY 2026 12 - 12 196.532 387.629 532.427 2,036.358 - 2,036.358 - - 387.629 9.200 Total Obligation Authority ($ in Millions) FY 2027 Total 4 187.332 Plus CY Advance Procurement ($ in Millions) FY 2027 OOC 2 9.200 Net Procurement (P-1) ($ in Millions) FY 2027 Base 1 - 196.532 - 532.427 - 387.629 - 2,036.358 - 532.427 - - 2,036.358 - 2,036.358 - - 2,036.358 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 196,532.000 - 193,814.500 - 133,106.750 - 169,696.500 - - 169,696.500 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost LTAMDS Manufacturing (†) 133,230.000 1 System Engineering / Program Management - - Subtotal: Recurring Cost - - Advance Procurement - ICS (Interim Contractor Support) - Obsolescence Mitigation / End of Life Buy 133.230 133,230.000 - 2 - - 133.230 - - - 9.200 - - - 41.483 - - - - - - - Supply Chain Resiliency - - - - New Vendor Quallification - - - Survivability Auxillary Equipment - - Subtotal: Non Recurring Cost - 266.460 126,605.000 - 4 - - - - - - - 24.050 - - - - - - - - - - - - - - - 50.683 - - 183.913 - 506.420 122,910.000 1,474.920 - - - 122,910.000 12 1,474.920 - - 8.790 - - - - - 8.790 - - 1,483.710 - - - - - 1,483.710 - - - - - - - - - - 7.490 - - 35.789 - - - - - 35.789 - - - 55.450 - - - - - 55.450 - - - - 39.660 - - - - - 39.660 - - - - - 16.660 - - - - - 16.660 - - - - - - 32.720 - - - - - 32.720 - 24.050 - - 7.490 - - 180.279 - - - - - 180.279 - 290.510 - - 513.910 - - 1,663.989 - - - - - 1,663.989 266.460 - 12 506.420 Non Recurring Cost Subtotal: Hardware Cost Support - Common Support Equipment Cost LI 7265C12000 - Lower Tier Air and Missile Defense (AMD)... Army UNCLASSIFIED Page 3 of 11 P-1 Line #1 Volume 1 - 3 === page 34 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 7265C12000 / Lower Tier Air and Missile Defense (AMD) Sensor Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: C12101 / Lower Tier Air and Missile Defense Sensor MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Support and Handling Equipment - - 3.895 - - 11.860 - - 17.717 - - 67.197 - - - - - 67.197 Subtotal: Support - Common Support Equipment Cost - - 3.895 - - 11.860 - - 17.717 - - 67.197 - - - - - 67.197 Technical Publications - - - - - - - - - - - 5.486 - - - - - 5.486 Subtotal: Support - Data Cost - - - - - - - - - - - 5.486 - - - - - 5.486 - - 7.994 - - 69.549 - - - - - 267.738 - - - - - 267.738 - - 7.994 - - 69.549 - - - - - 267.738 - - - - - 267.738 - - - - - - - - - - - 7.960 - - - - - 7.960 - - - - - - - - - - - 7.960 - - - - - 7.960 Production Engineering - - 0.230 - - 5.500 - - 0.390 - - 12.758 - - - - - 12.758 Subtotal: Support Production Engineering Cost - - 0.230 - - 5.500 - - 0.390 - - 12.758 - - - - - 12.758 Quality Assurance - - 0.500 - - 10.210 - - 0.410 - - 11.230 - - - - - 11.230 Subtotal: Support - Quality Assurance Cost - - 0.500 - - 10.210 - - 0.410 - - 11.230 - - - - - 11.230 2,036.358 - - - Support - Data Cost Support - Initial Spares and Repair Parts Cost Initial Spares and Repair Parts Subtotal: Support - Initial Spares and Repair Parts Cost Support - New Equipment Training (NET) Cost Training Support Subtotal: Support - New Equipment Training (NET) Cost Support - Production Engineering Cost Support - Quality Assurance Cost Gross/Weapon System Cost 196,532.000 1 196.532 193,814.500 2 Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 7265C12000 - Lower Tier Air and Missile Defense (AMD)... Army 387.629 133,106.750 4 532.427 169,696.500 FY 2025 12 FY 2027 Base FY 2026 169,696.500 FY 2027 OOC 12 2,036.358 FY 2027 Total 2 4 12 - 12 387.629 532.427 2,036.358 - 2,036.358 2 4 12 - 12 387.629 532.427 2,036.358 - 2,036.358 UNCLASSIFIED Page 4 of 11 P-1 Line #1 Volume 1 - 4 === page 35 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 P-1 Line Item Number / Title: 7265C12000 / Lower Tier Air and Missile Defense (AMD) Sensor ID Code (A=Service Ready, B=Not Service Ready) : A (†) Item Number / Title [DODIC]: C12101 / Lower Tier Air and Missile Defense Sensor MDAP/MAIS Code: indicates the presence of a P-5a LI 7265C12000 - Lower Tier Air and Missile Defense (AMD)... Army UNCLASSIFIED Page 5 of 11 P-1 Line #1 Volume 1 - 5 === page 36 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (†) LTAMDS Manufacturing (†) LTAMDS Manufacturing (†) LTAMDS Manufacturing (†) O O C P-1 Line Item Number / Title: 7265C12000 / Lower Tier Air and Missile Defense (AMD) Sensor Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: C12101 / Lower Tier Air and Missile Defense Sensor Qty Specs Date Unit Cost Avail Revision Now? Available ($ K) RFP Issue Date FY Contractor and Location 2025 Raytheon / 350 Lowell Street, Andover, MA 01810 SS / FPIF ACC-RSA May 2025 Sep 2028 2 133,230.000 N Apr 2022 2026 Raytheon / 350 Lowell Street, Andover, MA 01810 SS / FPIF ACC-RSA Dec 2025 Apr 2029 4 126,605.000 N Apr 2022 2027 Raytheon / 350 Lowell Street, Andover, MA 01810 SS / FPIF ACC-RSA Dec 2026 Jan 2030 12 122,910.000 N Apr 2022 (Each) indicates the presence of a P-21 LI 7265C12000 - Lower Tier Air and Missile Defense (AMD)... Army UNCLASSIFIED Page 6 of 11 P-1 Line #1 Volume 1 - 6 === page 37 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 7265C12000 / Lower Tier Air and Missile Defense (AMD) Sensor Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C12101 / Lower Tier Air and Missile Defense Sensor Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LTAMDS Manufacturing Prior Years Deliveries: 1 1 2025 ARMY 2 0 2 1 2026 ARMY 4 0 4 1 2027 ARMY 12 0 12 A - - - - - - - - - - - - - - - - - A - - - - - - - - - - 2 4 12 O C T N O V D E C J A N F E B LI 7265C12000 - Lower Tier Air and Missile Defense (AMD)... Army M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 7 === page 38 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 7265C12000 / Lower Tier Air and Missile Defense (AMD) Sensor Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C12101 / Lower Tier Air and Missile Defense Sensor Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LTAMDS Manufacturing Prior Years Deliveries: 1 1 2025 ARMY 2 0 2 - - - - - - - - - - - - - - - - - - - - - - - 1 2026 ARMY 4 0 4 - - - - - - - - - - - - - - - - - - - - - - - - 4 1 2027 ARMY 12 0 12 A - - - - - - - - - - - - - - - - - - - - - - 12 O C T N O V D E C J A N F E B LI 7265C12000 - Lower Tier Air and Missile Defense (AMD)... Army M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R A P R M A Y J U N J U L A U G 2 0 S E P Volume 1 - 8 === page 39 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 7265C12000 / Lower Tier Air and Missile Defense (AMD) Sensor Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C12101 / Lower Tier Air and Missile Defense Sensor Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LTAMDS Manufacturing Prior Years Deliveries: 1 1 2025 ARMY 2 2 0 1 2026 ARMY 4 0 4 - - - - - - 0 1 2027 ARMY 12 0 12 - - - - - - O C T N O V D E C J A N F E B LI 7265C12000 - Lower Tier Air and Missile Defense (AMD)... Army M A R 1 - A P R 1 M A Y - J U N 1 J U L A U G UNCLASSIFIED Page 9 of 11 - 1 S E P 0 O C T N O V D E C 1 J A N 1 F E B P-1 Line #1 1 M A R 1 A P R 1 M A Y 1 J U N 1 J U L 1 A U G 1 S E P Volume 1 - 9 3 === page 40 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 7265C12000 / Lower Tier Air and Missile Defense (AMD) Sensor Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C12101 / Lower Tier Air and Missile Defense Sensor Fiscal Year 2031 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2030 1 OCT Fiscal Year 2032 Calendar Year 2031 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2032 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E LTAMDS Manufacturing Prior Years Deliveries: 1 1 2025 ARMY 2 2 0 1 2026 ARMY 4 4 0 1 2027 ARMY 12 9 3 0 0 1 O C T 1 N O V 1 D E C 0 J A N F E B LI 7265C12000 - Lower Tier Air and Missile Defense (AMD)... Army M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 10 === page 41 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 7265C12000 / Lower Tier Air and Missile Defense (AMD) Sensor Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: C12101 / Lower Tier Air and Missile Defense Sensor Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Raytheon - 350 Lowell Street, Andover, MA 01810 MSR For 2027 1-8-5 For 2027 MAX For 2027 2 6 12 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 36 Total After Oct 1 ALT Prior to Oct 1 36 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 7265C12000 - Lower Tier Air and Missile Defense (AMD)... Army UNCLASSIFIED Page 11 of 11 P-1 Line #1 Volume 1 - 11 0 === page 42 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 10: Surface-to-Air Missile System P-1 Line Item Number / Title: 8046C20200 / TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD) Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - Procurement Quantity (Units in Each) - - - 27 - 27 Gross/Weapon System Cost ($ in Millions) - - - 907.162 - 907.162 Less PY Advance Procurement ($ in Millions) - - - Net Procurement (P-1) ($ in Millions) - - - Plus CY Advance Procurement ($ in Millions) - - - Total Obligation Authority ($ in Millions) - - - - - 907.162 - - - 907.162 - 907.162 - - 907.162 5,828.696 5,951.308 - 6,096.492 - 5,951.308 - 5,972.012 - 5,828.696 - 5,972.012 - 5,828.696 To FY 2031 Complete 24,755.670 - - 5,972.012 27 - 6,096.492 - 5,951.308 Total - 24,755.670 - 6,096.492 - 24,755.670 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - 33,598.593 - 33,598.593 916,876.667 Description: The FY 2027 request for Thermal High Altitude Area Defense (THAAD) includes $907,162 thousand of discretionary and $10,528,043 thousand of mandatory for a total of $11,435,205 thousand. The mandatory funds for THAAD procures 830 THAAD missiles to support Munitions Acceleration Council (MAC) expanded production rate. The FY 2027 budget request includes twenty-seven (27) THAAD Interceptors, Interceptor Obsolescence mitigations efforts, THAAD Ground Component Modifications, the Stockpile Reliability Program (SRP), and AN/TPY-2 Sensors Arbitrary Waveform Generation (AWFG) Receiver/ Exciter (REX) Redesign Kits & Secure Servers. Beginning in FY 2027, the THAAD Program has transitioned from the Missile Defense Agency to the Army. Prior year procurement funding was included in the Missile Defense Agency budget: P-1 Line Item: MD07/THAAD and MD11/BMDS Sensors. This budget line is planning for a Multi-year Procurement contract starting in FY 2027 with additional information as provided in the MYP1 through 4 exhibits. THAAD is an element of the Terminal Defense Segment (TDS) of the Missile Defense System. THAAD enhances the TDS by deepening, complementing, and extending the Missile Defense System battlespace and capability to engage ballistic targets in the late mid-course and terminal phases of their trajectory. THAAD Army Navy / Transportable Radar Surveillance and Control (AN/TPY-2) radar is a surveillance and targeting sensor providing data to the THAAD system to execute intercept missions. The THAAD system, in conjunction with the fielded Phased Array Tracking Radar to Intercept on Target system, provides the TDS for the Missile Defense System objective of enhancing the Missile Defense System capability. The THAAD system is comprised of five (5) major components: Interceptors, Launchers, AN/TPY-2 Radar, THAAD Fire Control and Communication Tactical Station Group, and Peculiar Support Equipment including Missile Round Pallet-Transportable (MRP-T). Secondary Distribution Army Total: FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 Quantity - - 27 - 27 Total Obligation Authority - - 907.162 - 907.162 Quantity - - 27 - 27 LI 8046C20200 - TERMINAL HIGH ALTITUDE AREA DEFENSE (THA... Army UNCLASSIFIED Page 1 of 9 FY 2029 - 5,828.696 P-1 Line #2 - FY 2030 - 5,951.308 - FY 2031 - - 5,972.012 - 6,096.492 - Volume 1 - 12 === page 43 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 10: Surface-to-Air Missile System P-1 Line Item Number / Title: 8046C20200 / TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD) Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Secondary Distribution Secondary Distribution Total Obligation Authority FY 2025 FY 2027 Base FY 2026 - - LI 8046C20200 - TERMINAL HIGH ALTITUDE AREA DEFENSE (THA... Army FY 2027 OOC 907.162 UNCLASSIFIED Page 2 of 9 FY 2027 Total - FY 2028 907.162 5,828.696 P-1 Line #2 FY 2029 5,951.308 FY 2030 FY 2031 5,972.012 6,096.492 Volume 1 - 13 === page 44 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 10: Surface-to-Air Missile System ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 8046C20200 / TERMINAL HIGH ALTITUDE AREA DEFENSE (THAAD) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 C20211 / TALON INTERCEPTOR PROCUREMENT - / - - / - - / - 27 / 323.548 - / - P-5 C20212 / AN/TPY-2 SENSOR PROCUREMENT - / - - / - - / - - / 28.673 - / - - / 28.673 P-5 C20213 / THAAD MODS - / - - / - - / - - / 479.495 - / - - / 479.495 P-5 C20214 / THAAD LAUNCHER - / - - / - - / - - / 75.446 - / - - / 75.446 P-40 Total Gross/Weapon System Cost - / - - / - - / - 27 / 907.162 - / - 27 / 907.162 27 / 323.548 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 budget request includes twenty-seven (27) THAAD Interceptors, Interceptor Obsolescence mitigations efforts, THAAD Ground Component Modifications, the Stockpile Reliability Program (SRP), and AN/TPY-2 Sensors AWFG REX Redesign Kits & Secure Servers. Previously, THAAD successfully used a "synergy" lot buy approach to THAAD Interceptor procurement. This approach entailed awarding a contract that included an option for the following FY funding. By utilizing this approach, THAAD achieved savings in material costs in multiple FYs. This resulted in a higher Interceptor quantity buy at a lower average unit price than if the lot buys were not combined. The Army will initiate a Multi-Year Procurement contract for THAAD Interceptors in FY27. "Procurement Quantity" and "Flyaway Unit Cost" above represent Interceptors only, but the "Net Procurement" cost above includes the costs of all hardware. "Gross Weapon System Unit Cost" above represents Interceptors, THAAD Mods, THAAD Launcher, and AN/TPY-2. LI 8046C20200 - TERMINAL HIGH ALTITUDE AREA DEFENSE (THA... Army UNCLASSIFIED Page 3 of 9 P-1 Line #2 Volume 1 - 14 === page 45 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: Item Number / Title [DODIC]: 8046C20200 / TERMINAL HIGH ALTITUDE AREA DEFENSE C20211 / TALON INTERCEPTOR (THAAD) PROCUREMENT Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) - - - 27 - 27 Gross/Weapon System Cost ($ in Millions) - - - 323.548 - 323.548 Less PY Advance Procurement ($ in Millions) - - - Net Procurement (P-1) ($ in Millions) - - - Plus CY Advance Procurement ($ in Millions) - - - Total Obligation Authority ($ in Millions) - - - - - 323.548 - - - 323.548 - 323.548 - - 323.548 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - 11,983.259 - - 11,983.259 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Interceptor - - - - - - - - - 27 323.548 - - - 27 323.548 - - - - - - - - - - - 323.548 - - - - - 323.548 Subtotal: Hardware Cost - - - - - - - - - - - 323.548 - - - - - 323.548 Gross/Weapon System Cost - - - - - - - - - 27 323.548 - - - 27 323.548 Subtotal: Recurring Cost 11,983.259 11,983.259 11,983.259 11,983.259 Remarks: "Procurement Quantity" above represents interceptors only, but the "Net Procurement" cost above includes the costs of all hardware. The FY 2027 budget request includes twenty-seven (27) THAAD Interceptors, Interceptor Obsolescence mitigations efforts, THAAD Battery Ground Component Modifications, and the Stockpile Reliability Program (SRP). Secondary Distribution Army Total: Secondary Distribution FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total Quantity - - 27 - 27 Total Obligation Authority - - 323.548 - 323.548 Quantity - - 27 - 27 Total Obligation Authority - - 323.548 - 323.548 LI 8046C20200 - TERMINAL HIGH ALTITUDE AREA DEFENSE (THA... Army UNCLASSIFIED Page 4 of 9 P-1 Line #2 Volume 1 - 15 === page 46 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: Item Number / Title [DODIC]: 8046C20200 / TERMINAL HIGH ALTITUDE AREA DEFENSE C20212 / AN/TPY-2 SENSOR (THAAD) PROCUREMENT Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - - 28.673 - 28.673 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - - 28.673 - 28.673 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - - 28.673 - 28.673 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost AWFG REX Redesign Kits - - - - - - - - - 1,733.000 11 19.063 - - - 1,733.000 11 Secure Servers - - - - - - - - - 2,402.500 4 9.610 - - - 2,402.500 4 Subtotal: Recurring Cost - - - - - - - - - - - 28.673 - - - - - 28.673 Subtotal: Hardware Cost - - - - - - - - - - - 28.673 - - - - - 28.673 Gross/Weapon System Cost - - - - - - - - - - - 28.673 - - - - - 28.673 19.063 9.610 Remarks: AN/TPY-2 Radar consists of one (1) Antenna Equipment Unit (AEU), one (1) Cooling Equipment Unit (CEU), one (1) Electronic Equipment Unit (EEU), and two (2) Prime Power Units (PPU) The FY 2027 budget request includes AN/TPY-2 Sensors Arbitrary Waveform Generation (AWFG) Receiver/ Exciter (REX) Redesign Kit & Secure Servers to upgrade the fleet's existing servers to enhance the fleet's cybersecurity protection and processing capability. This will transition the current analog Receiver/Exciter technology to a modern digital signal-processing capability with advanced waveform types providing a scalable, distributed processing solution. This upgrade will increase system reliability and enhance capability against emerging threats. Secondary Distribution Army Total: FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total Quantity - - - - - Total Obligation Authority - - 28.673 - 28.673 Quantity - - - - - LI 8046C20200 - TERMINAL HIGH ALTITUDE AREA DEFENSE (THA... Army UNCLASSIFIED Page 5 of 9 P-1 Line #2 Volume 1 - 16 === page 47 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 P-1 Line Item Number / Title: Item Number / Title [DODIC]: 8046C20200 / TERMINAL HIGH ALTITUDE AREA DEFENSE C20212 / AN/TPY-2 SENSOR (THAAD) PROCUREMENT ID Code (A=Service Ready, B=Not Service Ready) : Secondary Distribution Secondary Distribution Total Obligation Authority LI 8046C20200 - TERMINAL HIGH ALTITUDE AREA DEFENSE (THA... Army MDAP/MAIS Code: FY 2025 FY 2027 Base FY 2026 - UNCLASSIFIED Page 6 of 9 - FY 2027 OOC 28.673 P-1 Line #2 FY 2027 Total - 28.673 Volume 1 - 17 === page 48 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: Item Number / Title [DODIC]: 8046C20200 / TERMINAL HIGH ALTITUDE AREA DEFENSE C20213 / THAAD MODS (THAAD) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 Procurement Quantity (Units in Each) - - - Gross/Weapon System Cost ($ in Millions) - - - Less PY Advance Procurement ($ in Millions) - - - Net Procurement (P-1) ($ in Millions) - - - Plus CY Advance Procurement ($ in Millions) - - - Total Obligation Authority ($ in Millions) - - - FY 2027 Base FY 2027 OOC - - 479.495 FY 2027 Total - - - 479.495 - 479.495 - - - 479.495 - 479.495 - - 479.495 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Hardware Cost Non Recurring Cost Modifications - - - - - - - - - - - 305.757 - - - - - 305.757 - - - - - - - - - - - 305.757 - - - - - 305.757 - - - - - - - - - - - 305.757 - - - - - 305.757 Depot Maintenance - - - - - - - - - - - 173.738 - - - - - 173.738 Subtotal: Recurring Cost - - - - - - - - - - - 173.738 - - - - - 173.738 Subtotal: Logistics Cost - - - - - - - - - - - 173.738 - - - - - 173.738 Gross/Weapon System Cost - - - - - - - - - - - 479.495 - - - - - 479.495 Subtotal: Non Recurring Cost Subtotal: Hardware Cost Logistics Cost Recurring Cost Remarks: The THAAD Mods line above consists of Interceptor obsolescence, THAAD Battery Ground Component Modifications, and the Stockpile Reliability Program (SRP). Interceptor obsolescence encompasses mitigation activities that protect the system design and ensure a producible technical data package. This preserves an affordable future product cost within an acceptable production schedule. Examples of mitigation activities include component replacement parts, materials, qualification, alternative source/parts qualification, and piece part/material bridge buys to support subsequent years' production lots. THAAD Battery Ground Component obsolescence modifications address weapon system obsolescence, supportability issues, and cyber threats. These modifications will result in a common baseline (Configuration 3) for all THAAD Batteries. LI 8046C20200 - TERMINAL HIGH ALTITUDE AREA DEFENSE (THA... Army UNCLASSIFIED Page 7 of 9 P-1 Line #2 Volume 1 - 18 === page 49 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 P-1 Line Item Number / Title: Item Number / Title [DODIC]: 8046C20200 / TERMINAL HIGH ALTITUDE AREA DEFENSE C20213 / THAAD MODS (THAAD) ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: The SRP encompasses production support, field testing, storage and aging testing, and stockpile reliability testing and analysis for THAAD interceptors. This provides reliability data and analysis which provides warfighter confidence and enables the extension of the Interceptor shelf and service life, resulting in significant cost avoidance. Critical Interceptor Obsolescence mitigation efforts are required to prevent a break in THAAD Interceptor production due to the exhaustion of legacy components. The critical Interceptor Obsolescence mitigation efforts include the following components: - Seeker: Consists of an infrared sensor and electronics to provide video to the Mission Computer (MC). - Next-Generation Mission Computer: Integrates seeker and inertial data to compute and execute precise trajectory adjustments for a "hit-to-kill" interception. - Laser Initiated Ordnance System: Initiates flight sequencing ordnance events commanded by the MC and destructs the missile booster stage under specified conditions. - Thrust Vector Actuator: Provides control of the thrust vector during the boost phase of the flight. - Valve Driver Assembly: Receives commands from the MC, sends valve firing commands to the Divert and Attitude Control System (DACS) thrusters, and communicates DACS status back to the MC. - Boost Motor: A single-stage solid propellant rocket motor. - Passive Leak Indicator: A passively indicating system that visually indicates the presence of a hypergolic fuel leak from the DACS. - Telemetry Master Encoder Lite: Used to combine and transfer data from numerous sources into a single Pulse Code Modulation data stream. Secondary Distribution Army Total: Secondary Distribution FY 2025 FY 2027 Base FY 2026 Quantity - - Total Obligation Authority - - Quantity - - Total Obligation Authority - - LI 8046C20200 - TERMINAL HIGH ALTITUDE AREA DEFENSE (THA... Army UNCLASSIFIED Page 8 of 9 FY 2027 OOC 479.495 479.495 P-1 Line #2 FY 2027 Total - 479.495 479.495 Volume 1 - 19 === page 50 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: Item Number / Title [DODIC]: 8046C20200 / TERMINAL HIGH ALTITUDE AREA DEFENSE C20214 / THAAD LAUNCHER (THAAD) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - - 75.446 - 75.446 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - - 75.446 - 75.446 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - - 75.446 - 75.446 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost THAAD Launcher Equipment - - - - - - - - - - - 75.446 - - - - - 75.446 Subtotal: Recurring Cost - - - - - - - - - - - 75.446 - - - - - 75.446 Subtotal: Hardware Cost - - - - - - - - - - - 75.446 - - - - - 75.446 Gross/Weapon System Cost - - - - - - - - - - - 75.446 - - - - - 75.446 Remarks: The THAAD Launcher line above consists of new battery equipment (Heavy Expanded Mobility Tactical Truck (HEMTT), MRP-Ts, trailers, etc.) to support battery readiness and increased Interceptor production. Secondary Distribution Army Total: Secondary Distribution FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total Quantity - - - - - Total Obligation Authority - - 75.446 - 75.446 Quantity - - - - - Total Obligation Authority - - 75.446 - 75.446 LI 8046C20200 - TERMINAL HIGH ALTITUDE AREA DEFENSE (THA... Army UNCLASSIFIED Page 9 of 9 P-1 Line #2 Volume 1 - 20 === page 51 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 10: Surface-to-Air Missile System ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8082C14300 / M-SHORAD - Procurement Program Elements for Code B Items: N/A Other Related Program Elements: 0604117A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - Continuing - - Continuing - - - - - - - - - - Continuing Continuing - 195 5 29 14 - 14 2,274.318 69.091 631.114 712.690 - 712.690 2,274.318 2,274.318 69.091 69.091 631.114 712.690 631.114 - - - - 712.690 - 712.690 - - 712.690 492.101 492.101 492.101 307.950 307.950 307.950 To FY 2031 Complete Total Continuing Continuing Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 11,663.169 13,818.200 21,762.552 50,906.429 - 50,906.429 Continuing Continuing Description: The FY 2026 spend plan amount for M-SHORAD includes $631,114 thousand of discretionary and $80,850 thousand of mandatory for a total of $711,964 thousand. This funding line is directly aligned to the Army Air and Missile Defense Modernization Priority. SGT STOUT is an Air Defense weapon system consisting of multiple ground-to-air missile launchers, sensors, and a gun integrated on a Stryker Combat Vehicle. The SGT STOUT system provides the Army improved capabilities for defense of maneuver formations and other tactical echelons from adversarial low altitude air attack and surveillance. The system is in response to an adaptive suite of airborne threat capabilities, supported by an integrated mix of surface-to-air and surface-to-surface shooters that threaten the ability of maneuver forces to conduct operations. Specifically, maneuver formations require the air defense identification and defeat capabilities of the M-SHORAD system to counter to counter Fixed Wing, Rotary Wing, and Unmanned Aerial System threats. This system provides the capability to identify, track, and neutralize or destroy low-altitude air threats to include FW, RW, and UAS while keeping pace and surviving with the maneuver Brigades. The Army is currently utilizing Middle Tier Acquisition - Rapid Fielding authorities and will transition to Major Capability Acquisition at Milestone C in FY 2026." (Removes the unnecessary hyphen in Milestone C. The SGT STOUT program will be fielded to six SGT STOUT battalions and ITB's (Institutional Training Base). SGT STOUT will provide the long-term capability to counter a broad range of FW, RW and UAS threats. The total cost of the SGT STOUT Middle Tier of Acquisition (MTA) Rapid Fielding (RF) effort is $1,732.5 million from FY 2024 to FY 2026, including RDT&E ($41.9M) and procurement ($1,690.6M) of SGT STOUT systems. The remainder of the SGT STOUT MTA RF is fully funded across the Future Years Defense Program. Procurement quantities for prior years and FY 2025 are incorrect. Correct Quantities are: Prior - 201, FY 2025 - 0, FY 2026 - 29, FY 2027 - 14, FY 2028 - 0, FY 2029-31 - 0 LI 8082C14300 - M-SHORAD - Procurement Army UNCLASSIFIED Page 1 of 13 P-1 Line #3 Volume 1 - 21 === page 52 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 10: Surface-to-Air Missile System ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 8082C14300 / M-SHORAD - Procurement Program Elements for Code B Items: N/A Other Related Program Elements: 0604117A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 C14301 / Maneuver - Short Range Air Defense (M-SHORAD) P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 195 / 2,274.318 5 / 69.091 29 / 631.114 14 / 712.690 - / - 14 / 712.690 195 / 2,274.318 5 / 69.091 29 / 631.114 14 / 712.690 - / - 14 / 712.690 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The Army has an active Indefinite Delivery / Indefinite Quantity (IDIQ) contract with General Dynamic Land Systems (GDLS). The FY 2027 funding is for the procurement of 14 SGT STOUT systems (remaining ITB's and readiness floats), Initial Spares (Three Battalions), ILS (Integrated Logistics Services), Fielding, Engineering Services, GFE, TADSS hardware, Program Management support, and ICS (Integrated Contractor Support). Procurement quantities for prior years and FY 2025 are incorrect. Correct Quantities are: Prior - 201, FY 2025 - 0, FY 2026 - 29, FY 2027 - 14, FY 2028 - 0, FY 2029-31 - 0 LI 8082C14300 - M-SHORAD - Procurement Army UNCLASSIFIED Page 2 of 13 P-1 Line #3 Volume 1 - 22 === page 53 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8082C14300 / M-SHORAD - Procurement Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: C14301 / Maneuver - Short Range Air Defense (M-SHORAD) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2026 FY 2027 Total 29 14 - 14 2,274.318 69.091 631.114 712.690 - 712.690 - - 2,274.318 Plus CY Advance Procurement ($ in Millions) - 69.091 - Total Obligation Authority ($ in Millions) FY 2027 OOC 5 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2027 Base 195 - 2,274.318 - 631.114 - 69.091 - 712.690 - 631.114 - - 712.690 - 712.690 - - 712.690 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 11,663.169 - 13,818.200 - 21,762.552 - 50,906.429 - - 50,906.429 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Unit Cost 29 438.074 15,817.000 Qty (Each) ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost SGT STOUT 201 1,863.891 - - - - - 1,863.891 - - - - - 438.074 Engineering Sevices - - 51.363 - - 7.866 - - Subtotal: Non Recurring Cost - - 51.363 - - 7.866 - - - 1,915.254 - - 7.866 - GFE Hardware - - 29.049 - - 23.619 Platoon Leader Vehicle Integration - - 1.172 - - Systems (†) Subtotal: Recurring Cost 9,273.090 15,106.000 14 221.438 - - - - - 221.438 - - - 22.997 - - 24.761 - - - 22.997 - - 24.761 - - 461.071 - - 246.199 - - - 7.663 - - 6.876 - - - - - - 15,817.000 14 221.438 - - 221.438 - - - 24.761 - - - - 24.761 - - - - 246.199 - - - - - 6.876 - - - - - - - Non Recurring Cost Subtotal: Flyaway Cost Hardware Cost Recurring Cost Dual SVULs 152 106.061 - - - - - - - - - - - - - - - - - 136.282 - - 23.619 - - 7.663 - - 6.876 - - - - - 6.876 SVUL Production Retrofits - - - - - - - - 0.347 - - - - - - - - - System Obsolescence - - 22.540 - - - - - - - - 35.859 - - - - - 35.859 Subtotal: Recurring Cost 697.770 Non Recurring Cost LI 8082C14300 - M-SHORAD - Procurement Army UNCLASSIFIED Page 3 of 13 P-1 Line #3 Volume 1 - 23 === page 54 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8082C14300 / M-SHORAD - Procurement Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: C14301 / Maneuver - Short Range Air Defense (M-SHORAD) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Product Improvement Retrofit - - - - - - - - - - - 84.858 - - - - - 84.858 Subtotal: Non Recurring Cost - - 22.540 - - - - - 0.347 - - 120.717 - - - - - 120.717 - - 158.822 - - 23.619 - - 8.010 - - 127.593 - - - - - 127.593 Fielding - - 49.459 - - 18.221 - - 39.120 - - 45.754 - - - - - 45.754 Training Aids, Devices, Simulations, and Simulators - - 0.389 - - - - - - - - 73.607 - - - - - 73.607 Subtotal: Recurring Cost - - 49.848 - - 18.221 - - 39.120 - - 119.361 - - - - - 119.361 Subtotal: Package Fielding Cost - - 49.848 - - 18.221 - - 39.120 - - 119.361 - - - - - 119.361 - - 89.763 - - 9.088 - - 107.343 - - 201.194 - - - - - 201.194 - - 89.763 - - 9.088 - - 107.343 - - 201.194 - - - - - 201.194 Integrated Logistics Support - - 20.889 - - 4.998 - - 4.765 - - 6.856 - - - - - 6.856 Subtotal: Support - Logistics Cost - - 20.889 - - 4.998 - - 4.765 - - 6.856 - - - - - 6.856 - - 39.742 - - 5.299 - - 10.805 - - 11.487 - - - - - 11.487 - - 39.742 - - 5.299 - - 10.805 - - 11.487 - - - - - 11.487 195 2,274.318 29 631.114 14 712.690 - - - 14 712.690 Subtotal: Hardware Cost Package Fielding Cost Recurring Cost Support - Initial Spares and Repair Parts Cost Initial Spares and Repair Parts Subtotal: Support - Initial Spares and Repair Parts Cost Support - Logistics Cost Support - Program Management Cost Government Management Subtotal: Support - Program Management Cost Gross/Weapon System Cost 11,663.169 13,818.200 5 69.091 21,762.552 50,906.429 50,906.429 Remarks: FY 2027 is the initial year of TADSS COTS hardware procurement which consists of 30mm Dummy Rounds, Embedded Trainer, Visual Aircraft Recognition, Stinger Troop Proficiency Trainer, Captive Flight Trainer, and Field Handling Trainer. LI 8082C14300 - M-SHORAD - Procurement Army UNCLASSIFIED Page 4 of 13 P-1 Line #3 Volume 1 - 24 === page 55 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 P-1 Line Item Number / Title: 8082C14300 / M-SHORAD - Procurement ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: C14301 / Maneuver - Short Range Air Defense (M-SHORAD) MDAP/MAIS Code: To date, SGT STOUT has procured initial spares packages for 1.5 Battalions. The FY 2026 Initial Spares procurement of $107.343 million procures 1.7 Battalions. The FY 2027 Initial Spares procurement of $201.194 million acquires remaining Initial Spares packages for initially fielded SGT STOUT systems for 2.1 Battalions and remaining ITB's and readiness floats for 1.0 Battalion. FY 2027 System Obsolescence initiates the replacement of the currently obsolete MEP switch that is no longer supported by the vendor. In addition, this funding starts to procure and retrofit the necessary hardware for the Commander and Gunner's displays on SGT STOUT fielded systems. FY 2027 Product Improvement begins the retrofitting of 30mm ease of loading, buffer box, no link/delink tool, dunnage catcher to prevent jamming of turret, and required MAPS GEN II. Additionally, starts the Software upgrades to existing Multi-Hemispheric Radars (MHR). (†) indicates the presence of a P-5a LI 8082C14300 - M-SHORAD - Procurement Army UNCLASSIFIED Page 5 of 13 P-1 Line #3 Volume 1 - 25 === page 56 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 FY Contractor and Location (†) 2020 GDLS / Sterling Heights, MI SS / FFP Huntsville, AL Sep 2020 Jun 2022 28 8,253.571 N (†) 2021 GDLS / Sterling Heights, MI SS / FFP Huntsville, AL May 2021 Dec 2022 59 7,729.758 N (†) 2022 GDLS / Sterling Heights, MI SS / FFP Huntsville, AL Feb 2022 Oct 2023 37 8,505.273 N (†) 2023 GDLS / Sterling Heights, MI SS / FFP Huntsville, AL Mar 2023 Dec 2024 24 8,505.292 N (†) 2024 GDLS / Sterling Heights, MI Option / FFP Huntsville. AL May 2024 Apr 2026 53 11,812.000 N (†) 2026 GDLS / Sterling Heights, MI Option / FFP Huntsville, AL Oct 2026 Dec 2028 29 15,106.000 N (†) 2027 GDLS / Sterling Heights, MI Option / FFP Huntsville, AL May 2027 Oct 2029 14 15,817.000 N SGT STOUT Systems SGT STOUT Systems SGT STOUT Systems SGT STOUT Systems SGT STOUT Systems SGT STOUT Systems SGT STOUT Systems (†) Item Number / Title [DODIC]: C14301 / Maneuver - Short Range Air Defense (M-SHORAD) Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 8082C14300 / M-SHORAD - Procurement Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 8082C14300 - M-SHORAD - Procurement Army UNCLASSIFIED Page 6 of 13 P-1 Line #3 Volume 1 - 26 === page 57 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8082C14300 / M-SHORAD - Procurement Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C14301 / Maneuver - Short Range Air Defense (M-SHORAD) Fiscal Year 2020 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2019 1 OCT Calendar Year 2020 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2021 M A Y J U N J U L Calendar Year 2021 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P SGT STOUT Systems 1 2020 ARMY 28 0 28 1 2021 ARMY 59 0 59 A - - - - - - - - - - - - - 28 A - - - - - 1 2022 ARMY 37 0 37 59 37 1 2023 ARMY 24 0 24 24 1 2024 ARMY 53 0 53 53 1 2026 ARMY 29 0 29 29 1 2027 ARMY 14 0 14 14 O C T N O V LI 8082C14300 - M-SHORAD - Procurement Army D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #3 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 27 === page 58 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8082C14300 / M-SHORAD - Procurement Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C14301 / Maneuver - Short Range Air Defense (M-SHORAD) Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P SGT STOUT Systems 1 2020 ARMY 28 0 28 - - - - - - - - 1 2021 ARMY 59 0 59 - - - - - - - - - 1 - 3 - 4 - 6 - 6 - 6 2 0 1 2022 ARMY 37 0 37 A - - - - - - - - - - 1 2023 ARMY 24 0 24 1 2024 ARMY 53 0 53 53 1 2026 ARMY 29 0 29 29 1 2027 ARMY 14 0 14 3 6 - 6 - 6 - 6 6 6 6 6 6 2 - - - - - - - 37 A - - - - - - - 24 14 O C T N O V LI 8082C14300 - M-SHORAD - Procurement Army D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #3 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 28 === page 59 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8082C14300 / M-SHORAD - Procurement Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C14301 / Maneuver - Short Range Air Defense (M-SHORAD) Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P SGT STOUT Systems 1 2020 ARMY 28 28 0 1 2021 ARMY 59 57 2 2 0 1 2022 ARMY 37 0 37 4 1 2023 ARMY 24 0 24 1 2024 ARMY 53 0 53 1 2026 ARMY 29 0 29 1 2027 ARMY 14 0 14 0 4 - 4 - 3 - 3 - 3 - 3 - 3 - 2 4 3 1 0 - - - - - - - A - - - - - - - 1 2 - 2 - 2 - 2 - 2 - 1 - 2 - 3 - 3 - - 4 53 29 14 O C T N O V LI 8082C14300 - M-SHORAD - Procurement Army D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #3 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 29 === page 60 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8082C14300 / M-SHORAD - Procurement Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C14301 / Maneuver - Short Range Air Defense (M-SHORAD) Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P SGT STOUT Systems 1 2020 ARMY 28 28 0 0 1 2021 ARMY 59 59 0 0 1 2022 ARMY 37 37 0 1 2023 ARMY 24 20 4 1 2024 ARMY 53 0 53 1 2026 ARMY 29 0 29 1 2027 ARMY 14 0 14 0 2 2 - O C T 0 - N O V LI 8082C14300 - M-SHORAD - Procurement Army - D E C - J A N - F E B - M A R 2 A P R 2 M A Y 2 J U N 2 J U L 2 A U G UNCLASSIFIED Page 10 of 13 - S E P - - A - - O C T N O V 2 2 D E C 2 J A N 2 F E B P-1 Line #3 2 M A R 2 A P R 2 2 2 2 23 - - - - - 29 A - - - - - 14 M A Y J U N J U L A U G S E P Volume 1 - 30 === page 61 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8082C14300 / M-SHORAD - Procurement Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C14301 / Maneuver - Short Range Air Defense (M-SHORAD) Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P SGT STOUT Systems 1 2020 ARMY 28 28 0 0 1 2021 ARMY 59 59 0 0 1 2022 ARMY 37 37 0 0 1 2023 ARMY 24 24 0 1 2024 ARMY 53 30 23 - - 1 2026 ARMY 29 0 29 - - - - - - - - - - - - - - 1 2027 ARMY 14 0 14 - - - - - - - - - - - - - - 0 O C T N O V LI 8082C14300 - M-SHORAD - Procurement Army 2 D E C 2 J A N 2 F E B 2 M A R 2 A P R 2 M A Y 2 J U N 2 J U L 2 A U G UNCLASSIFIED Page 11 of 13 2 S E P 2 O C T 1 N O V 0 3 3 D E C 3 J A N 3 F E B P-1 Line #3 3 M A R 3 A P R 3 M A Y 3 J U N 3 J U L 2 A U G - 0 14 S E P Volume 1 - 31 === page 62 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8082C14300 / M-SHORAD - Procurement Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C14301 / Maneuver - Short Range Air Defense (M-SHORAD) Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E SGT STOUT Systems 1 2020 ARMY 28 28 0 0 1 2021 ARMY 59 59 0 0 1 2022 ARMY 37 37 0 0 1 2023 ARMY 24 24 0 0 1 2024 ARMY 53 53 0 0 1 2026 ARMY 29 29 0 1 2027 ARMY 14 0 14 0 3 O C T 3 N O V LI 8082C14300 - M-SHORAD - Procurement Army 3 D E C 3 J A N 2 F E B 0 M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #3 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 32 === page 63 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8082C14300 / M-SHORAD - Procurement Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: C14301 / Maneuver - Short Range Air Defense (M-SHORAD) Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 GDLS - Sterling Heights, MI MSR For 2027 1-8-5 For 2027 MAX For 2027 36 48 72 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 8 30 Total After Oct 1 ALT Prior to Oct 1 38 ALT After Oct 1 2 Manufacturing PLT 6 Total After Oct 1 30 36 Remarks: FY 2026 System buy is not reflecting correct total quantity due to the mandatory funding breakout on the P-5. Correct FY 2026 total should reflect 29 SGT STOUT systems. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 8082C14300 - M-SHORAD - Procurement Army UNCLASSIFIED Page 13 of 13 P-1 Line #3 Volume 1 - 33 === page 64 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 10: Surface-to-Air Missile System P-1 Line Item Number / Title: 8260C53101 / MSE Missile Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0604865A, 0603869A, 0604869A, 0605456A Line Item MDAP/MAIS Code: 492 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 3,506 194 310 244 - 244 1,672 1,675 1,684 1,690 Continuing 12,963.904 1,031.060 1,571.905 1,297.528 - 1,297.528 7,496.459 7,664.370 7,879.585 8,078.998 Continuing 126.000 126.000 905.060 1,445.905 12,963.904 252.000 13,215.904 905.060 1,445.905 - - 1,297.528 - - 1,297.528 - 1,297.528 - 1,297.528 7,496.459 7,496.459 7,664.370 7,664.370 7,879.585 7,879.585 To FY 2031 Complete - Total Continuing Continuing - 8,078.998 Continuing - 252.000 Continuing - 8,078.998 Continuing 252.000 Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 3,697.634 5,314.742 5,070.661 5,317.738 - 5,317.738 4,483.528 4,575.743 4,679.088 4,780.472 Continuing Continuing Description: The FY 2027 request for MSE Missile includes $1,297,528 thousand of discretionary and $10,931,919 thousand of mandatory for a total of $12,229,447 thousand. The mandatory funds for MSE procure a total of 2,554 MSE missiles to support Munitions Acceleration Council (MAC) expanded production rate. The FY 2026 spend plan amount for MSE Missile includes $1,445,905 thousand of discretionary and $200,000 thousand of mandatory for a total of $1,645,905 thousand. This funding line is a key enabler of the Army Modernization Priorities in support of Air and Missile Defense. FY 2027 funding supports the production of Missile Segment Enhancement (MSE) missiles, Field Surveillance Program (FSP), supporting equipment, ancillary missile items, PAC-3 Missile Support Center (P3MSC), Obsolescence, System Engineering/Program Management (SEPM), and Government/Software Engineering. The Missile Segment Enhancement (MSE) is a high velocity hit-to-kill, surface-to-air missile capable of intercepting tactical ballistic missiles, air breathing threats, cruise missiles, and unmanned aerial systems. The MSE represents the current generation PAC-3 missile which provides expanded battlespace performance against evolving threats and has been fully integrated into the Patriot system (US and international partners), the IAMD Battle Command System (IBCS), and the Terminal High Altitude Area Defense (THAAD) system (US only). The MSE is an agile, lethal interceptor providing substantial missile capabilities when combined with critical ground system improvements deployed specific to the M903 launching station. The MSE enhances Insensitive Munitions (IM) through a less sensitive, increased performance lethality enhancer, and the addition of armor and a thermally initiated venting system. A single canister design provides enhanced warfighter and logistics flexibility and facilitates improved IM performance for greater warfighter safety. The Patriot Advanced Capability-3 (PAC-3) Missile Field Surveillance Program (FSP) is required to ensure that the reliability, performance, and safety of fielded missiles in the Patriot family remain within the classified system specification for the life of the system. Initial FSP tasks confirm the quality of design, materials, tooling and test equipment procedures, and processes used in the manufacture of the Patriot Family of Missiles (PFoM). After missile deployment, results from surveillance firings, inspections, functional tests, storage and aging programs, and depot level missile maintenance processing provide the data required for the assessment of reliability, performance, and safety of the missile stockpile. LI 8260C53101 - MSE Missile Army UNCLASSIFIED Page 1 of 11 P-1 Line #4 Volume 1 - 34 === page 65 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 8260C53101 / MSE Missile Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 10: Surface-to-Air Missile System Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0604865A, 0603869A, 0604869A, 0605456A Line Item MDAP/MAIS Code: 492 The Patriot Family of Missiles (PFoM) are fielded under the Certified Round Concept. Under this approved concept, the missiles are capable of being placed in extended storage as part of war reserve stocks or deployed in operational units for variable periods and then fired without intervening tests or checkouts. In accordance with the Certified Round Concept, the reliability/performance of the missile is certified by the Short and Intermediate Effectors for Layered Defense (SHIELD) Project Office to be at an acceptable level for a stated period of time or corrective action is taken. The certification of reliability is made possible through the use of the PAC-3 Missile Support Center (P3MSC) contract to use technical support and knowledge of the testing of discrete lots of component parts, subassemblies and assemblies which the prime contractor Lockheed Martin Missiles and Fire Control (LMMFC) provides as the only source of technical knowledge, expertise, and facilities to perform FSP activities and process PFoM. SEPM support encompasses the overall planning, management, and control of the MSE program including all engineering and program management disciplines and activities. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 8260C53101 - MSE Missile Army FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 194 310 244 - 244 1,672 1,675 1,684 1,690 905.060 1,445.905 1,297.528 - 1,297.528 7,496.459 7,664.370 7,879.585 8,078.998 194 310 244 - 244 1,672 1,675 1,684 1,690 905.060 1,445.905 1,297.528 - 1,297.528 7,496.459 7,664.370 7,879.585 8,078.998 UNCLASSIFIED Page 2 of 11 P-1 Line #4 Volume 1 - 35 === page 66 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 10: Surface-to-Air Missile System P-1 Line Item Number / Title: 8260C53101 / MSE Missile Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0604865A, 0603869A, 0604869A, 0605456A Line Item MDAP/MAIS Code: 492 Exhibits Schedule Exhibit Type Title* P-5 C53101 / MSE Missile P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 3,506 / 12,963.904 194 / 1,031.060 310 / 1,571.905 244 / 1,297.528 - / - 244 / 1,297.528 3,506 / 12,963.904 194 / 1,031.060 310 / 1,571.905 244 / 1,297.528 - / - 244 / 1,297.528 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 procurement dollars support the production of Missile Segment Enhancement (MSE) missiles, Field Surveillance Program (FSP), supporting equipment, ancillary missile items, PAC-3 Missile Support Center (P3MSC), Obsolescence, System Engineering/Program Management (SE/PM), and Government/Software Engineering. Prior Year unit cost on P-40 does not reflect classified quantities. The program received $200 million of mandatory funding in FY 2026 to procure 48 missiles. The FY 2027 request includes $10,931.919 million of mandatory funding to procure 2,554 missiles. The Army Requirements Oversight Council Memorandum (AROCM) approved an MSE Army Acquisition Objective (AAO) / Army Procurement Objective (APO) increase from 3,376 to 13,773 on 16 April 2025. Unit prices reflect an assessed yearly Foreign Military Sales (FMS) procurement of PAC-3 missile variants. In the event FMS procurements do not occur at this level, the budgeted missile unit price may not be achievable. The Army intends to convert any price advantage created through contract negotiations, other service procurement, and/or foreign military sales to increase the Army procurement MSE missiles. LI 8260C53101 - MSE Missile Army UNCLASSIFIED Page 3 of 11 P-1 Line #4 Volume 1 - 36 === page 67 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8260C53101 / MSE Missile Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C53101 / MSE Missile MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2027 OOC FY 2027 Total 310 244 - 244 12,963.904 1,031.060 1,571.905 1,297.528 - 1,297.528 12,963.904 Plus CY Advance Procurement ($ in Millions) 126.000 126.000 905.060 1,445.905 252.000 Total Obligation Authority ($ in Millions) FY 2027 Base 194 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2026 3,506 - 13,215.904 - - 905.060 - 1,297.528 - 1,445.905 - - 1,297.528 - 1,297.528 - - 1,297.528 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 3,697.634 - 5,314.742 - 5,070.661 - 5,317.738 - - 5,317.738 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) Qty (Each) FY 2025 Total Cost Unit Cost 4,266.464 ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Base Total Cost Unit Cost 4,987.857 ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost (†) 2,246 8,737.937 194 827.694 311 1,366.992 244 1,217.037 - - - 244 1,217.037 Field Surveillance - - 127.615 - - 18.870 - - 19.247 - - 19.632 - - - - - 19.632 PAC-3 Missile Support Center (P3MSC) - - 73.575 - - 11.737 - - 11.972 - - 12.211 - - - - - 12.211 Obsolescence - - 190.688 - - 22.659 - - 23.112 - - 23.575 - - - - - 23.575 Missile Hardware Launcher Mod Kit (LMK) 3,890.444 707.514 4,395.473 4,987.857 138 97.637 - - - - - - - - - - - - - - - Heater Kits - - 2.500 - - - - - - - - - - - - - - - Msl Round Trainer / Empty Round Trainer - - 271.033 - - - - - - - - - - - - - - - Initial Production Facilitization - - 88.313 - - - - - - - - - - - - - - - Government/Software Engineering - - 88.737 - - 9.784 - - 9.980 - - 10.179 - - - - - 10.179 Sys Engrg/Proj Mgmt (SE/PM) Contractor - - 248.515 - - 14.316 - - 14.602 - - 14.894 - - - - - 14.894 Tranche/Supplemental Funding (Quantities Classified) - - 3,036.355 - - - - - - - - - - - - - - - Advance Procurement - Long Lead Items - - - - 126.000 - - 126.000 - - - - - - - - - Subtotal: Recurring Cost - - - - 1,031.060 - - 1,571.905 - - - - - - - 12,962.905 1,297.528 1,297.528 Non Recurring Cost LI 8260C53101 - MSE Missile Army UNCLASSIFIED Page 4 of 11 P-1 Line #4 Volume 1 - 37 === page 68 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8260C53101 / MSE Missile Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C53101 / MSE Missile MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Organic Subtotal: Non Recurring Cost Subtotal: Flyaway Cost Gross/Weapon System Cost Unit Cost ($ K) Qty (Each) ($ M) - - 3,697.634 FY 2025 Total Cost Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) 0.999 - - - 0.999 - - - 12,963.904 - - 1,031.060 3,506 12,963.904 194 1,031.060 5,314.742 FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) - - - - - - - 1,571.905 310 1,571.905 5,070.661 Qty ($ K) - FY 2027 OOC Total Cost (Each) Unit Cost ($ M) ($ K) - - - - - - - - 1,297.528 244 1,297.528 5,317.738 FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - - - - - - - - - - - - - - - - 1,297.528 - - - 244 1,297.528 5,317.738 - Remarks: P Form quantities on P-40 and P-21 do not reflect additional mandatory funding or any possible unit cost savings associated with an FY26-FY32 MYP contract. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total 194 310 244 - 244 905.060 1,445.905 1,297.528 - 1,297.528 194 310 244 - 244 905.060 1,445.905 1,297.528 - 1,297.528 indicates the presence of a P-5a LI 8260C53101 - MSE Missile Army UNCLASSIFIED Page 5 of 11 P-1 Line #4 Volume 1 - 38 === page 69 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (†) O O C P-1 Line Item Number / Title: 8260C53101 / MSE Missile FY Contractor and Location Method/Type or Funding Vehicle Item Number / Title [DODIC]: C53101 / MSE Missile Location of PCO Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($ K) RFP Issue Date Missile Hardware (†) 2023 LMMFC / Dallas, TX SS / FFP AMCOM, RSA, AL Dec 2022 May 2025 252 3,825.131 Y Jun 2019 Missile Hardware (†) 2024 LMMFC / Dallas, TX SS / FFP AMCOM, RSA, AL Jun 2024 Sep 2026 230 3,839.704 Y Jan 2023 Missile Hardware (†) 2025 LMMFC / Dallas, TX SS / FFP AMCOM, RSA, AL Jul 2025 Sep 2027 194 4,266.464 Y Jan 2023 Missile Hardware (†) 2026 LMMFC / Dallas, TX SS / FPIF AMCOM, RSA, AL Dec 2025 May 2028 311 4,395.473 Y Jan 2023 Missile Hardware (†) 2027 LMMFC / Dallas, TX SS / FFP AMCOM, RSA, AL Dec 2026 May 2029 244 4,987.857 Y Jan 2026 indicates the presence of a P-21 Remarks: The FY 2027 funding procures 244 MSE missiles based on a unit cost of $4.988 million, which is comprised of the MSE Missile ($4.180 million), required ancillary hardware ($0.320 million), and required producibility resilience ($0.488 million). Ancillary hardware includes items such as MSE conversion kits, telemetry kits, parts library, storage/aging, tooling, and initial issue spares. Producibility resilience includes production continuity efforts specific to each annual production buy to ensure the stability of production capacity. The FY 2027 unit cost of $4.988 million is based on the unit cost of the definitized FY 2026 MSE production quantities and is subject to change. This budget line is planning for a Multi-year Procurement contract that started in FY 2026 with additional information as provided in the MYP1 through 4 exhibits. Exhibit P-21, Production Schedule is subject to change. LI 8260C53101 - MSE Missile Army UNCLASSIFIED Page 6 of 11 P-1 Line #4 Volume 1 - 39 === page 70 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8260C53101 / MSE Missile Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C53101 / MSE Missile Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Missile Hardware Prior Years Deliveries: 1764 1 2023 ARMY 252 0 252 1 2024 ARMY 230 0 230 A - 1 2025 ARMY 194 0 194 194 1 2026 ARMY 311 0 311 311 1 2027 ARMY 244 0 244 - - - - - - - - - - - - - - - - - - - - 252 A - - - - 230 244 O C T LI 8260C53101 - MSE Missile Army - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #4 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 40 === page 71 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8260C53101 / MSE Missile Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C53101 / MSE Missile Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Missile Hardware Prior Years Deliveries: 1764 1 2023 ARMY 252 0 252 - - - - - - - 20 20 20 20 20 20 22 22 22 22 22 22 1 2024 ARMY 230 0 230 - - - - - - - - - - - - - - - - - - - - - - - 20 210 1 2025 ARMY 194 0 194 A - - - - - - - - - - - - - - - 194 1 2026 ARMY 311 0 311 A - - - - - - - - - - 311 1 2027 ARMY 244 0 244 244 O C T LI 8260C53101 - MSE Missile Army 0 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #4 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 41 === page 72 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8260C53101 / MSE Missile Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C53101 / MSE Missile Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Missile Hardware Prior Years Deliveries: 1764 1 2023 ARMY 252 252 0 1 2024 ARMY 230 20 210 20 20 20 20 20 20 20 20 20 20 10 0 1 2025 ARMY 194 0 194 - - - - - - - - - - - 16 16 16 16 16 16 16 16 16 16 16 18 1 2026 ARMY 311 0 311 - - - - - - - - - - - - - - - - - - - 26 26 26 26 1 2027 ARMY 244 0 244 A O C T LI 8260C53101 - MSE Missile Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 11 0 S E P O C T N O V D E C J A N F E B P-1 Line #4 M A R A P R M A Y J U N J U L 0 A U G 26 181 - 244 S E P Volume 1 - 42 === page 73 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8260C53101 / MSE Missile Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C53101 / MSE Missile Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Missile Hardware Prior Years Deliveries: 1764 1 2023 ARMY 252 252 0 0 1 2024 ARMY 230 230 0 0 1 2025 ARMY 194 194 0 1 2026 ARMY 311 130 181 26 26 26 26 26 26 25 1 2027 ARMY 244 0 244 - - - - - - - 0 O C T LI 8260C53101 - MSE Missile Army N O V D E C J A N F E B M A R A P R 0 20 M A Y 20 J U N 20 J U L 20 A U G UNCLASSIFIED Page 10 of 11 20 S E P 20 O C T 20 N O V 20 D E C 21 J A N 21 F E B P-1 Line #4 21 M A R 21 A P R 0 M A Y J U N J U L A U G S E P Volume 1 - 43 === page 74 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8260C53101 / MSE Missile Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Item Number / Title [DODIC]: C53101 / MSE Missile Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 144 650 2,000 1 LMMFC - Dallas, TX ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 2 34 Total After Oct 1 ALT Prior to Oct 1 36 ALT After Oct 1 0 Manufacturing PLT 2 Total After Oct 1 29 31 Remarks: The MSE production line includes deliveries for both US and Foreign Military Sales (FMS). Gaps between scheduled US missile deliveries are attributed to FMS. FMS and US combine to provide significant production line continuity and buying power efficiencies. Production Rates reflect annual production capacity. Due to fluctuation in the delivery schedule, a detailed FMS schedule cannot be provided. Schedule changes and release would be required from DSCA and would be notional. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 8260C53101 - MSE Missile Army UNCLASSIFIED Page 11 of 11 P-1 Line #4 Volume 1 - 44 === page 75 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 8540C29600 / PRECISION STRIKE MISSILE (PRSM) Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 10: Surface-to-Air Missile System Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0607134A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 648 338 108 680 - 680 418 422 494 442 - 3,550 1,437.426 491.497 268.726 1,226.526 - 1,226.526 822.564 852.341 1,020.407 905.635 - 7,025.122 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 1,437.426 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 1,437.426 - - 491.497 - 268.726 - - 491.497 - 1,226.526 - 268.726 - - 1,226.526 - 1,226.526 - - 1,226.526 - - 822.564 - 852.341 - - 1,020.407 - 822.564 To FY 2031 Complete - 905.635 - 852.341 - - 1,020.407 Total 7,025.122 - 905.635 - 7,025.122 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 2,218.250 1,454.133 2,488.204 1,803.715 - 1,803.715 1,967.856 2,019.765 2,065.601 2,048.948 - 1,978.908 Description: The FY 2027 request for Precision Strike Missile (PrSM) includes $1,226,526 thousand of discretionary and $692,000 thousand of mandatory for a total of $1,918,526 thousand. The mandatory funds for PrSM procures 454 PrSM missiles to support Munitions Acceleration Council (MAC) expanded production rate. The FY 2026 spend plan amount for Precision Strike Missile (PrSM) includes $268,726 thousand of discretionary and $277,816 thousand of mandatory for a total of $546,542 thousand. PrSM funding line is directly aligned to the Army Long Range Precision Fires (LRPF) modernization priority. PrSM is the Army's next generation surface-to-surface missile that replaces and improves upon Army Tactical Missile System (ATACMS) capabilities. PrSM requirements include: a threshold max range of 400km, specified lethality against the designated target set, a launch pod missile container (LPMC) that holds two missiles, survivability in a threat environment, and compatibility with the existing launcher platforms (M270A2 Multiple Launch Rocket System (MLRS) and M142 High Mobility Artillery Rocket System (HIMARS)). PrSM will meet cluster and insensitive munition (IM) requirements and is being designed with an open system approach that provides the capability for future growth to counter new and emerging threats. The mission of PrSM Increment 1 is to attack, neutralize, suppress, and destroy targets using missile delivered indirect precision fires. PrSM will provide joint force commanders with a 24/7, all-weather capability to attack critical and time sensitive area and point targets including threat air defense, missile launchers, command and control centers, assembly and staging areas, and high payoff targets at all depths of the multi-domain battlefield. PrSM will counter the enemy's ability to conduct combat maneuver and air defense operations. PrSM Increment 2 integrates a seeker to attack critical time sensitive moving maritime or relocatable land targets. PrSM Increment 2 procurement begins in FY 2026. Secondary Distribution Army Quantity Total Obligation Authority Total: FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 338 108 680 - 680 418 422 494 442 491.497 268.726 1,226.526 - 1,226.526 822.564 852.341 1,020.407 905.635 338 108 680 - 680 418 422 494 442 Quantity LI 8540C29600 - PRECISION STRIKE MISSILE (PRSM) Army UNCLASSIFIED Page 1 of 19 P-1 Line #5 Volume 1 - 45 === page 76 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 10: Surface-to-Air Missile System P-1 Line Item Number / Title: 8540C29600 / PRECISION STRIKE MISSILE (PRSM) Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0607134A Line Item MDAP/MAIS Code: N/A Secondary Distribution Secondary Distribution Total Obligation Authority FY 2025 491.497 LI 8540C29600 - PRECISION STRIKE MISSILE (PRSM) Army FY 2026 268.726 FY 2027 Base FY 2027 OOC 1,226.526 UNCLASSIFIED Page 2 of 19 FY 2027 Total - FY 2028 1,226.526 822.564 P-1 Line #5 FY 2029 852.341 FY 2030 FY 2031 1,020.407 905.635 Volume 1 - 46 === page 77 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 10: Surface-to-Air Missile System P-1 Line Item Number / Title: 8540C29600 / PRECISION STRIKE MISSILE (PRSM) Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0607134A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits P-5 C29850 / PrSM Baseline P-5a, P-21 P-5 C29853 / PRSM INCREMENT 2 P-5a, P-21 P-40 Total Gross/Weapon System Cost ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 648 / 1,437.426 338 / 491.497 108 / 205.582 - / - 648 / 1,437.426 - / - 338 / 491.497 664 / 1,103.097 - / - / 63.144 16 / 123.429 - / - 16 / 123.429 108 / 268.726 680 / 1,226.526 - / - 680 / 1,226.526 - 664 / 1,103.097 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Base procurement dollars in the amount of $1,226.526 million supports a multi-year production contract for 680 PrSM missiles with launch pod missile containers (LPMCs). The PrSM missiles include 664 Increment 1 missiles and 16 Increment 2 missiles. The program received $277.816 million of mandatory funding in FY 2026 for PrSM Increment 1 to support the Army priorities for PrSM and increasing production to 550. The FY 2027 request includes $692.000 million of mandatory funding for PrSM Increment 1 to support a multi-year production contract for 454 missiles. The current Army acquisition objective (AAO) is 3,986 missiles for PrSM Increment 1 and 1,589 missiles for PrSM Increment 2. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. PrSM funding line is directly aligned to the Army Long Range Precision Fires (LRPF) modernization priority. The Army intends to convert any price advantage created through contract negotiations, other service procurement, and international cooperative partnerships to procure additional PrSM missiles. LI 8540C29600 - PRECISION STRIKE MISSILE (PRSM) Army UNCLASSIFIED Page 3 of 19 P-1 Line #5 Volume 1 - 47 === page 78 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8540C29600 / PRECISION STRIKE MISSILE (PRSM) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C29850 / PrSM Baseline MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2026 FY 2027 Total 108 664 - 664 1,437.426 491.497 205.582 1,103.097 - 1,103.097 - - 1,437.426 Plus CY Advance Procurement ($ in Millions) - 491.497 - Total Obligation Authority ($ in Millions) FY 2027 OOC 338 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2027 Base 648 - 1,437.426 - 205.582 - 491.497 - 1,103.097 - 205.582 - - 1,103.097 - 1,103.097 - - 1,103.097 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 2,218.250 - 1,454.133 - 1,903.537 - 1,661.291 - - 1,661.291 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) Qty (Each) FY 2025 Total Cost Unit Cost 1,204.794 1,343.118 ($ M) ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost Recurring (†) Production 1,859.250 648 338 453.974 1,725.417 108 186.345 1,551.131 664 1,029.951 - - - 1,551.131 664 1,029.951 Engineering Changes - - 8.460 - - 1.585 - - 0.627 - - 1.265 - - - - - 1.265 Subtotal: Recurring Cost - - 1,213.254 - - 455.559 - - 186.972 - - 1,031.216 - - - - - 1,031.216 Non-Recurring Production - - 1.057 - - 3.172 - - 4.976 - - 32.151 - - - - - 32.151 Rate Tooling - - 186.295 - - 21.269 - - - - - - - - - - - - System Engineering - - 29.076 - - 8.433 - - 10.876 - - 18.071 - - - - - 18.071 Subtotal: Non Recurring Cost - - 216.428 - - 32.874 - - 15.852 - - 50.222 - - - - - 50.222 - - 1,429.682 - - 488.433 - - 202.824 - - 1,081.438 - - - - - 1,081.438 Non Recurring Cost Subtotal: Flyaway Cost Package Fielding Cost Non Recurring Cost - - 0.009 - - 0.018 - - 0.017 - - 0.122 - - - - - 0.122 Subtotal: Non Recurring Cost Fielding - - 0.009 - - 0.018 - - 0.017 - - 0.122 - - - - - 0.122 Subtotal: Package Fielding Cost - - 0.009 - - 0.018 - - 0.017 - - 0.122 - - - - - 0.122 - 3.076 - - 1.008 - - 1.347 - - 13.559 - - - - - 13.559 Support - Common Support Equipment Cost Support and Handling Equipment - LI 8540C29600 - PRECISION STRIKE MISSILE (PRSM) Army UNCLASSIFIED Page 4 of 19 P-1 Line #5 Volume 1 - 48 === page 79 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8540C29600 / PRECISION STRIKE MISSILE (PRSM) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C29850 / PrSM Baseline MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) Subtotal: Support - Common Support Equipment Cost FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - 3.076 - - 1.008 - - 1.347 - - 13.559 - - - - - 13.559 Technical Publications - - 0.325 - - 0.184 - - 0.112 - - 1.130 - - - - - 1.130 Subtotal: Support - Data Cost - - 0.325 - - 0.184 - - 0.112 - - 1.130 - - - - - 1.130 - - 2.707 - - 0.706 - - 0.720 - - 1.198 - - - - - 1.198 - - 2.707 - - 0.706 - - 0.720 - - 1.198 - - - - - 1.198 - - 1.627 - - 1.148 - - 0.561 - - 5.650 - - - - - 5.650 - - 1.627 - - 1.148 - - 0.561 - - 5.650 - - - - - 5.650 338 491.497 108 205.582 1,103.097 - - - Support - Data Cost Support - Program Management Cost Government Management Subtotal: Support - Program Management Cost Support - Training Cost Services Subtotal: Support - Training Cost Gross/Weapon System Cost 2,218.250 648 1,437.426 1,454.133 1,903.537 1,661.291 664 1,661.291 664 1,103.097 Remarks: In FY 2025 the program awarded 400 Rate Tooling. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total 338 108 664 - 664 491.497 205.582 1,103.097 - 1,103.097 338 108 664 - 664 491.497 205.582 1,103.097 - 1,103.097 indicates the presence of a P-5a LI 8540C29600 - PRECISION STRIKE MISSILE (PRSM) Army UNCLASSIFIED Page 5 of 19 P-1 Line #5 Volume 1 - 49 === page 80 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements O O C (†) Recurring Production (†) Recurring Production (†) Recurring Production (†) Recurring Production (†) Recurring Production (†) Recurring Production (†) Recurring Production (†) P-1 Line Item Number / Title: 8540C29600 / PRECISION STRIKE MISSILE (PRSM) Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: C29850 / PrSM Baseline Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty RFP Issue Date FY Contractor and Location 2021 Lockheed Martin / M.&F.C. Sys. / Dallas, TX SS / FFP Aviation and Missile Command Sep 2021 Nov 2023 26 2,199.956 N Feb 2021 2022 Lockheed Martin / M.&F.C. Sys. / Dallas, TX SS / FFP Aviation and Missile Command Sep 2022 Mar 2025 54 2,382.807 N Feb 2022 2023 Lockheed Martin / M.&F.C. Sys. / Dallas, TX SS / FFP Aviation and Missile Command Sep 2023 Mar 2026 50 2,989.326 N Jul 2022 2024 Lockheed Martin / M.&F.C. Sys. / Dallas, TX SS / FFP Aviation and Missile Command Mar 2024 Dec 2026 518 1,676.262 N Oct 2023 2025 Lockheed Martin / M.&F.C. Sys. / Dallas, TX SS / FFP Aviation and Missile Command Mar 2025 Dec 2027 338 1,343.118 N Jul 2024 2026 Lockheed Martin / M.&F.C. Sys. / Dallas, TX SS / FFP Aviation and Missile Command Mar 2026 Dec 2028 108 1,725.417 N Jul 2025 2027 Lockheed Martin / M.&F.C. Sys. / Dallas, TX SS / FFP Aviation and Missile Command Mar 2027 Dec 2029 664 1,551.131 N Jul 2026 (Each) indicates the presence of a P-21 Remarks: P-21 Production Schedule: FY 2026 quantity of 108 is Base funding only FY 2027 quantity of 664 is Base funding only In FY 2025, the Program Office increased annual production capacity from 300 to 400 missiles. In FY 2027, P-5a Recurring Production Unit Cost reflects rate tooling to 550 missiles. The budget line is planning for a Multi-year Procurement contract starting in FY 2027 with additional information as provided in the MYP1 through 4 exhibits. Acronyms SS - Sole Source FFP - Firm Fixed Price LI 8540C29600 - PRECISION STRIKE MISSILE (PRSM) Army UNCLASSIFIED Page 6 of 19 P-1 Line #5 Volume 1 - 50 === page 81 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8540C29600 / PRECISION STRIKE MISSILE (PRSM) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C29850 / PrSM Baseline Fiscal Year 2021 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT Calendar Year 2021 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2022 M A Y J U N J U L Calendar Year 2022 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Recurring Production 1 2021 ARMY 26 0 26 1 2022 ARMY 54 0 54 A - - - - - - - - - - - - - 26 A - 1 2023 ARMY 50 0 50 54 50 1 2024 ARMY 518 0 518 518 1 2025 ARMY 338 0 338 338 1 2026 ARMY 108 0 108 108 1 2027 ARMY 664 0 664 664 O C T N O V D E C J A N LI 8540C29600 - PRECISION STRIKE MISSILE (PRSM) Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 19 S E P O C T N O V D E C J A N F E B P-1 Line #5 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 51 === page 82 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8540C29600 / PRECISION STRIKE MISSILE (PRSM) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C29850 / PrSM Baseline Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Recurring Production 1 2021 ARMY 26 0 26 - - - - - - - - - - - - - - - - - - - - - 1 2022 ARMY 54 0 54 - - - - - - - - - - - - - - 2 - 2 - - - - - - - - - 4 18 1 2023 ARMY 50 0 50 A - - - - - - - - - - - - - 50 1 2024 ARMY 518 0 518 A - - - - - - - 518 1 2025 ARMY 338 0 338 338 1 2026 ARMY 108 0 108 108 1 2027 ARMY 664 0 664 54 664 O C T N O V D E C J A N LI 8540C29600 - PRECISION STRIKE MISSILE (PRSM) Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 19 S E P O C T N O V D E C J A N F E B P-1 Line #5 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 52 === page 83 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8540C29600 / PRECISION STRIKE MISSILE (PRSM) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C29850 / PrSM Baseline Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Recurring Production 1 2021 ARMY 26 8 18 1 2022 ARMY 54 0 54 - 4 - 6 - 8 - - 0 1 2023 ARMY 50 0 50 - - - - - 1 2024 ARMY 518 0 518 - - - - - 1 2025 ARMY 338 0 338 1 2026 ARMY 108 0 108 1 2027 ARMY 664 0 664 2 - - 14 - - 18 - - 20 - - - - - - - - - - - - 12 - - 20 - - 18 0 0 - - - - - - - - - - - - - - - - - - - 518 A - - - - - - - - - - - - - - - - - - - 338 A - - - - - - - 108 664 O C T N O V D E C J A N LI 8540C29600 - PRECISION STRIKE MISSILE (PRSM) Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 19 S E P O C T N O V D E C J A N F E B P-1 Line #5 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 53 === page 84 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8540C29600 / PRECISION STRIKE MISSILE (PRSM) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C29850 / PrSM Baseline Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Recurring Production 1 2021 ARMY 26 26 0 0 1 2022 ARMY 54 54 0 0 1 2023 ARMY 50 50 0 1 2024 ARMY 518 0 518 - - 130 - - 130 - - 130 - - 128 1 2025 ARMY 338 0 338 - - - - - - - - - - - - - - 86 - - 84 - - 84 - - 84 0 1 2026 ARMY 108 0 108 - - - - - - - - - - - - - - - - - - - - - - - - 108 1 2027 ARMY 664 0 664 - 664 0 A O C T N O V D E C J A N LI 8540C29600 - PRECISION STRIKE MISSILE (PRSM) Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 19 0 S E P O C T N O V D E C J A N F E B P-1 Line #5 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 54 === page 85 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8540C29600 / PRECISION STRIKE MISSILE (PRSM) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C29850 / PrSM Baseline Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Recurring Production 1 2021 ARMY 26 26 0 0 1 2022 ARMY 54 54 0 0 1 2023 ARMY 50 50 0 0 1 2024 ARMY 518 518 0 0 1 2025 ARMY 338 338 0 1 2026 ARMY 108 0 108 - - 27 - - 27 - - 27 - - 27 1 2027 ARMY 664 0 664 - - - - - - - - - - - - 0 O C T N O V D E C J A N LI 8540C29600 - PRECISION STRIKE MISSILE (PRSM) Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 19 S E P 0 O C T N O V 166 D E C J A N F E B P-1 Line #5 166 M A R A P R M A Y 166 J U N J U L A U G 166 S E P Volume 1 - 55 0 === page 86 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8540C29600 / PRECISION STRIKE MISSILE (PRSM) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: C29850 / PrSM Baseline Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Lockheed Martin - M.&F.C. Sys. / Dallas, TX MSR For 2027 1-8-5 For 2027 MAX For 2027 22 664 664 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 9 36 Total After Oct 1 ALT Prior to Oct 1 45 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 8540C29600 - PRECISION STRIKE MISSILE (PRSM) Army UNCLASSIFIED Page 12 of 19 P-1 Line #5 Volume 1 - 56 0 === page 87 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8540C29600 / PRECISION STRIKE MISSILE (PRSM) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C29853 / PRSM INCREMENT 2 MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base Procurement Quantity (Units in Each) - - - Gross/Weapon System Cost ($ in Millions) - - 63.144 Less PY Advance Procurement ($ in Millions) - - - Net Procurement (P-1) ($ in Millions) - - 63.144 Plus CY Advance Procurement ($ in Millions) - - - Total Obligation Authority ($ in Millions) - - 63.144 FY 2027 OOC FY 2027 Total 16 - 16 123.429 - 123.429 - - 123.429 - - - 123.429 - 123.429 - - 123.429 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - 7,714.313 - - 7,714.313 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost Recurring (†) - - - - - - Engineering Changes - - - - - - - - 0.172 - Subtotal: Recurring Cost - - - - - - - - 44.075 - Non-Recurring Production - - - - - - - - 16.590 Rate Tooling - - - - - - - - - System Engineering - - - - - - - - Subtotal: Non Recurring Cost - - - - - - - - - - - - - - Production 5,487.875 8 43.903 5,170.563 16 82.729 - - - 5,170.563 16 82.729 - 0.075 - - - - - 0.075 - 82.804 - - - - - 82.804 - - 10.710 - - - - - 10.710 - - 26.502 - - - - - 26.502 0.712 - - 0.908 - - - - - 0.908 - 17.302 - - 38.120 - - - - - 38.120 - 61.377 - - 120.924 - - - - - 120.924 Non Recurring Cost Subtotal: Flyaway Cost Support - Common Support Equipment Cost Support and Handling Equipment - - - - - - - - 0.398 - - 0.878 - - - - - 0.878 Subtotal: Support - Common Support Equipment Cost - - - - - - - - 0.398 - - 0.878 - - - - - 0.878 Technical Publications - - - - - - - - 0.033 - - 0.073 - - - - - 0.073 Subtotal: Support - Data Cost - - - - - - - - 0.033 - - 0.073 - - - - - 0.073 Support - Data Cost Support - Program Management Cost LI 8540C29600 - PRECISION STRIKE MISSILE (PRSM) Army UNCLASSIFIED Page 13 of 19 P-1 Line #5 Volume 1 - 57 === page 88 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8540C29600 / PRECISION STRIKE MISSILE (PRSM) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C29853 / PRSM INCREMENT 2 MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Government Management Subtotal: Support - Program Management Cost Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - - - - - - - 1.173 - - 1.198 - - - - - 1.198 - - - - - - - - 1.173 - - 1.198 - - - - - 1.198 Support - Training Cost - - - - - - - - 0.163 - - 0.356 - - - - - 0.356 Subtotal: Support - Training Cost Services - - - - - - - - 0.163 - - 0.356 - - - - - 0.356 Gross/Weapon System Cost - - - - - - - - 63.144 16 123.429 - - - 16 123.429 7,714.313 7,714.313 Remarks: Item Number C29853 / PRSM INCREMENT 2 was established in FY 2026 to separately account for PrSM Increment 2. Increment 2 unit cost is based on initial production and limited quantities. FY 2027 rate tooling is exclusively for Increment 2. Secondary Distribution Army Total: Secondary Distribution (†) FY 2025 FY 2027 Base FY 2026 Quantity - - Total Obligation Authority - 63.144 Quantity - - Total Obligation Authority - 63.144 FY 2027 OOC FY 2027 Total 16 - 16 123.429 - 123.429 16 - 16 123.429 - 123.429 indicates the presence of a P-5a LI 8540C29600 - PRECISION STRIKE MISSILE (PRSM) Army UNCLASSIFIED Page 14 of 19 P-1 Line #5 Volume 1 - 58 === page 89 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (†) Recurring Production (†) Recurring Production (†) O O C P-1 Line Item Number / Title: 8540C29600 / PRECISION STRIKE MISSILE (PRSM) Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: C29853 / PRSM INCREMENT 2 Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty RFP Issue Date FY Contractor and Location 2026 Lockheed Martin / M.&F.C. Sys. / Dallas, TX SS / FFP Aviation and Missile Command Aug 2026 Mar 2029 8 5,487.875 N Jul 2025 2027 Lockheed Martin / M.&F.C. Sys. / Dallas, TX SS / FFP Aviation and Missile Command Sep 2027 Sep 2030 16 5,170.563 N Jul 2026 (Each) indicates the presence of a P-21 Remarks: This budget line is planning for a Multi-year Procurement contract starting in FY 2027 with additional information as provided in the MYP1 through 4 exhibits. Acronyms SS - Sole Source FFP - Firm Fixed Price LI 8540C29600 - PRECISION STRIKE MISSILE (PRSM) Army UNCLASSIFIED Page 15 of 19 P-1 Line #5 Volume 1 - 59 === page 90 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8540C29600 / PRECISION STRIKE MISSILE (PRSM) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C29853 / PRSM INCREMENT 2 Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Recurring Production 1 2026 ARMY 8 0 8 1 2027 ARMY 16 0 16 A O C T N O V D E C J A N LI 8540C29600 - PRECISION STRIKE MISSILE (PRSM) Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 19 S E P O C T N O V D E C J A N F E B P-1 Line #5 M A R A P R M A Y J U N J U L A U G - 8 A - 16 S E P Volume 1 - 60 === page 91 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8540C29600 / PRECISION STRIKE MISSILE (PRSM) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C29853 / PRSM INCREMENT 2 Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Recurring Production 1 2026 ARMY 8 0 8 - - - - - - - - - - - - - - - - - 1 2027 ARMY 16 0 16 - - - - - - - - - - - - - - - - - O C T N O V D E C J A N LI 8540C29600 - PRECISION STRIKE MISSILE (PRSM) Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 19 S E P O C T N O V D E C J A N F E B P-1 Line #5 2 2 M A R 2 A P R 2 M A Y 0 J U N J U L A U G - 16 S E P Volume 1 - 61 === page 92 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8540C29600 / PRECISION STRIKE MISSILE (PRSM) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C29853 / PRSM INCREMENT 2 Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Recurring Production 1 2026 ARMY 8 8 0 1 2027 ARMY 16 0 16 0 O C T N O V D E C J A N LI 8540C29600 - PRECISION STRIKE MISSILE (PRSM) Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 18 of 19 4 S E P 4 O C T 4 N O V 4 D E C 0 J A N F E B P-1 Line #5 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 62 === page 93 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8540C29600 / PRECISION STRIKE MISSILE (PRSM) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: C29853 / PRSM INCREMENT 2 Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Lockheed Martin - M.&F.C. Sys. / Dallas, TX MSR For 2027 1-8-5 For 2027 MAX For 2027 2 16 16 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 9 36 Total After Oct 1 ALT Prior to Oct 1 45 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 8540C29600 - PRECISION STRIKE MISSILE (PRSM) Army UNCLASSIFIED Page 19 of 19 P-1 Line #5 Volume 1 - 63 0 === page 94 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 10: Surface-to-Air Missile System P-1 Line Item Number / Title: 8930C61001 / INDIRECT FIRE PROTECTION CAPABILITY INC 2-I Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 473 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 18 21 50 96 - 96 84 36 36 Gross/Weapon System Cost ($ in Millions) 612.429 465.244 719.689 1,626.004 - 1,626.004 1,741.520 997.316 997.617 Less PY Advance Procurement ($ in Millions) 31.286 Net Procurement (P-1) ($ in Millions) 581.143 Resource Summary Prior Years Procurement Quantity (Units in Each) Plus CY Advance Procurement ($ in Millions) 31.286 Total Obligation Authority ($ in Millions) 612.429 - - 465.244 - 719.689 - 1,626.004 - 465.244 - - 719.689 1,626.004 - 1,626.004 - - 1,626.004 - - 1,741.520 - 180 - 997.617 - Continuing - - 997.617 Total Continuing 1,135.323 Continuing - 997.316 Continuing 1,135.323 Continuing - 997.316 1,741.520 To FY 2031 Complete 31.286 Continuing - 1,135.323 Continuing 31.286 Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 34,023.833 22,154.476 14,393.780 16,937.542 - 16,937.542 20,732.381 27,703.222 27,711.583 6,307.350 Continuing Continuing Description: This funding line is directly aligned to one of the Army Air and Missile Defense Modernization Priorities. The Indirect Fire Protection Capability Increment 2 (IFPC Inc 2) will provide a ground-based weapon system designed to acquire, track, engage, and defeat Cruise Missiles (CM), and Unmanned Aircraft Systems (UAS) threats. The IFPC Inc 2 system consists of a launcher and interceptor integrated with the Army Integrated Air and Missile Defense (AIAMD) open systems architecture, IAMD Battle Command System (IBCS), and the Sentinel sensor to support the CM and UAS defeat mission. On 9 February 2019, the Army approved a Directed Requirement to initiate procurement of the Israeli IDDS-A for the Interim CMD capability. The Army contracted for two interim CMD (IDDS-A) batteries. The United States Government (USG) leased the IDDS-A assets to the Government of Israel (GOI) beginning in 1QFY2024. The Army entered a Middle Tier of Acquisition (MTA) Rapid Prototyping (RP) in September 2021, awarding a Firm Fixed Price Other Transaction Authority (OTA) agreement to Dynetics, Inc. to deliver the IFPC Inc 2 prototype solution. Upon completion of the MTA RP phase in April 2025, IFPC Inc 2 entered an MTA Rapid Fielding (RF). The total cost estimate of the IFPC Inc 2 MTA RF effort is $1,394.6 million, including RDT&E ($219.3 million) and procurement ($1,175.3 million). The remainder of the IFPC Inc 2 MTA RF effort is fully funded. This program supports the Air and Missile Defense Cross Functional Team (CFT). Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 21 50 96 - 96 84 36 36 180 465.244 719.689 1,626.004 - 1,626.004 1,741.520 997.316 997.617 1,135.323 21 50 96 - 96 84 36 36 180 465.244 719.689 1,626.004 - 1,626.004 1,741.520 997.316 997.617 1,135.323 LI 8930C61001 - INDIRECT FIRE PROTECTION CAPABILITY INC ... Army UNCLASSIFIED Page 1 of 17 P-1 Line #6 Volume 1 - 64 === page 95 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 10: Surface-to-Air Missile System P-1 Line Item Number / Title: 8930C61001 / INDIRECT FIRE PROTECTION CAPABILITY INC 2-I Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 473 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 C62001 / IFPC INC 2 AIM 9X MISSILE P-5a, P-21 - / 631.077 - / - - P-5 C62002 / IFPC INC 2-I BLOCK 1 SYSTEM P-5a, P-21 18 / 403.466 21 / 299.230 50 / 621.252 96 / 994.927 - / - 96 / 994.927 P-40 Total Gross/Weapon System Cost 18 / 612.429 21 / 465.244 50 / 719.689 96 / 1,626.004 - / - 96 / 1,626.004 / 208.963 - / 166.014 - / 98.437 - / 631.077 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Base procurement dollars in the amount of $1,626.004 million are designated for 96 IFPC Inc 2 launchers, 504 AIM-9X interceptors, 84 IFPC magazines. Funding increase from FY 2026 to FY 2027 is due to increased procurement quantity of IFPC Inc 2 launchers, interceptors, and IFPC magazines. The Army intends to convert any price advantage created through contract negotiations, other service procurement, and/or foreign military sales to increase the Army procurement of IFPC Inc 2. The Army will integrate an IFPC capability of a launcher and interceptor leveraging the Army Integrated Air and Missile Defense (AIAMD) open systems architecture and IAMD Battle Command System (IBCS) as the Fire Control component, and US sensor (Sentinel) with Pacific Deterrence Initiative (PDI) Launcher procurement in FY 2024 for delivery in FY 2026. LI 8930C61001 - INDIRECT FIRE PROTECTION CAPABILITY INC ... Army UNCLASSIFIED Page 2 of 17 P-1 Line #6 Volume 1 - 65 === page 96 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8930C61001 / INDIRECT FIRE PROTECTION CAPABILITY INC 2-I Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C62001 / IFPC INC 2 AIM 9X MISSILE MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) - 208.963 Less PY Advance Procurement ($ in Millions) 166.014 - Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) 631.077 - - - 98.437 631.077 - 631.077 - 166.014 FY 2027 Total - - 98.437 - 208.963 - - 166.014 - Total Obligation Authority ($ in Millions) FY 2027 OOC - 98.437 - 208.963 FY 2027 Base - 631.077 - 631.077 - - 631.077 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - - - 1,129.347 - 1,262.013 - 1,252.137 - - 1,252.137 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Non Recurring Cost IDDS-A Prior Years Rollup - - Magazine Facilitization - - - - - - - - - 586.222 - - - 4,388.095 - - - - Subtotal: Hardware Cost - - - - Gross/Weapon System Cost - - Subtotal: Non Recurring Cost Subtotal: Flyaway Cost 208.963 - - - - - - - - - - - - - - - - - - - - - - - 64.626 - - - - - 64.626 208.963 - - - - - - - - 64.626 - - - - - 64.626 208.963 - - - - - - - - 64.626 - - - - - 64.626 126 73.864 516.513 78 40.288 507.050 504 255.553 - - - 507.050 504 255.553 21 92.150 4,473.000 13 58.149 3,701.167 84 310.898 - - - 3,701.167 84 310.898 - 166.014 - - 98.437 - - 566.451 - - - - - 566.451 - 166.014 - - 98.437 - - 566.451 - - - - - 566.451 - 166.014 - 98.437 - 631.077 - - - - 631.077 - Hardware Cost Recurring Cost IFPC AIM-9X Interceptor Procurement (†) IFPC Magazine Procurement (†) Subtotal: Recurring Cost 208.963 1,129.347 1,262.013 1,252.137 1,252.137 Remarks: Facilitization in FY 2027 is to increase magazine production above the current capacity. LI 8930C61001 - INDIRECT FIRE PROTECTION CAPABILITY INC ... Army UNCLASSIFIED Page 3 of 17 P-1 Line #6 Volume 1 - 66 === page 97 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 P-1 Line Item Number / Title: 8930C61001 / INDIRECT FIRE PROTECTION CAPABILITY INC 2-I ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C62001 / IFPC INC 2 AIM 9X MISSILE MDAP/MAIS Code: The Army's unit price for the AIM-9X is higher than the Navy's. The increase is attributed to two factors: the Army requires a new warhead, whereas the Navy utilizes a GFM warhead and the Army includes container costs for shipping. The Army intends to convert any price advantage created through contract negotiations, other service procurement, and/or foreign military sales to increase the Army procurement AIM-9X missiles. The IDDS-A Prior Years Rollup cost element reflects for all Iron Dome activities from prior years. The C62001 was previously used for Iron Dome but has been converted to IFPC Inc 2 AIM-9X. The Prior Year Total does not represent the current program use. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 166.014 166.014 FY 2027 OOC 98.437 631.077 98.437 631.077 FY 2027 Total - 631.077 631.077 indicates the presence of a P-5a LI 8930C61001 - INDIRECT FIRE PROTECTION CAPABILITY INC ... Army UNCLASSIFIED Page 4 of 17 P-1 Line #6 Volume 1 - 67 === page 98 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 O O C Cost Elements IFPC AIM-9X Interceptor Procurement (†) IFPC AIM-9X Interceptor Procurement (†) IFPC AIM-9X Interceptor Procurement (†) (†) P-1 Line Item Number / Title: 8930C61001 / INDIRECT FIRE PROTECTION CAPABILITY INC 2-I Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: C62001 / IFPC INC 2 AIM 9X MISSILE Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty FY Contractor and Location 2025 U.S. Navy (Raytheon) / Tuscon, Arizona SS / FP Redstone Arsenal, AL Sep 2025 Apr 2028 126 586.222 N 2026 U.S. Navy (Raytheon) / Tuscon, Arizona SS / FP Redstone Arsenal, AL May 2026 Dec 2028 78 516.513 N 2027 U.S. Navy (Raytheon) / Tuscon, Arizona SS / FP Redstone Arsenal, AL Mar 2027 Oct 2029 504 507.050 N Sep 2025 Mar 2027 21 4,388.095 N (Each) IFPC Magazine Procurement (†) 2025 Raytheon / Tuscon, Arizona SS / FP Redstone Arsenal, AL IFPC Magazine Procurement (†) 2026 Raytheon / Tuscon, Arizona SS / FP Redstone Arsenal, AL Apr 2026 Oct 2027 13 4,473.000 N IFPC Magazine Procurement (†) 2027 Raytheon / Tuscon, Arizona SS / FP Redstone Arsenal, AL Mar 2027 Sep 2028 84 3,701.167 N RFP Issue Date indicates the presence of a P-21 LI 8930C61001 - INDIRECT FIRE PROTECTION CAPABILITY INC ... Army UNCLASSIFIED Page 5 of 17 P-1 Line #6 Volume 1 - 68 === page 99 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8930C61001 / INDIRECT FIRE PROTECTION CAPABILITY INC 2-I Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C62001 / IFPC INC 2 AIM 9X MISSILE Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P IFPC AIM-9X Interceptor Procurement 1 2025 ARMY 126 0 126 1 2026 ARMY 78 0 78 1 2027 ARMY 504 0 504 A - - - - - - - - - - - - - A - - - - - 126 78 504 IFPC Magazine Procurement 2 2025 ARMY 21 0 21 2 2026 ARMY 13 0 13 2 2027 ARMY 84 0 84 A - - - - - - - - - - - - - 21 A - - - - - - 13 84 O C T N O V D E C J A N F E B M A R LI 8930C61001 - INDIRECT FIRE PROTECTION CAPABILITY INC ... Army A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 17 S E P O C T N O V D E C J A N F E B P-1 Line #6 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 69 === page 100 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8930C61001 / INDIRECT FIRE PROTECTION CAPABILITY INC 2-I Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C62001 / IFPC INC 2 AIM 9X MISSILE Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P IFPC AIM-9X Interceptor Procurement 1 2025 ARMY 126 0 126 - - - - - - - - - - - - - - - - - - 21 21 21 21 21 21 0 1 2026 ARMY 78 0 78 - - - - - - - - - - - - - - - - - - - - - - - - 78 1 2027 ARMY 504 0 504 A - - - - - - - - - - - - - - - - - - - 504 IFPC Magazine Procurement 2 2025 ARMY 21 0 21 - - - - - 2 2026 ARMY 13 0 13 - - - - - 2 2027 ARMY 84 0 84 O C T N O V D E C J A N F E B 2 4 4 4 4 3 0 - - - - - - - A - - - - - - - M A R LI 8930C61001 - INDIRECT FIRE PROTECTION CAPABILITY INC ... Army A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 17 S E P 4 4 O C T 4 N O V 1 D E C 0 J A N F E B P-1 Line #6 M A R A P R M A Y J U N J U L A U G 7 77 S E P Volume 1 - 70 === page 101 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8930C61001 / INDIRECT FIRE PROTECTION CAPABILITY INC 2-I Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C62001 / IFPC INC 2 AIM 9X MISSILE Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E IFPC AIM-9X Interceptor Procurement 1 2025 ARMY 126 126 0 1 2026 ARMY 78 0 78 - - 13 13 13 13 13 13 0 1 2027 ARMY 504 0 504 - - - - - - - - 0 - - - - 84 84 84 84 84 84 0 IFPC Magazine Procurement 2 2025 ARMY 21 21 0 2 2026 ARMY 13 13 0 2 2027 ARMY 84 7 77 0 0 7 O C T 7 N O V 7 D E C 7 J A N 7 F E B 7 M A R LI 8930C61001 - INDIRECT FIRE PROTECTION CAPABILITY INC ... Army 7 A P R 7 M A Y 7 J U N 7 J U L 7 A U G UNCLASSIFIED Page 8 of 17 0 S E P O C T N O V D E C J A N F E B P-1 Line #6 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 71 === page 102 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8930C61001 / INDIRECT FIRE PROTECTION CAPABILITY INC 2-I Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: C62001 / IFPC INC 2 AIM 9X MISSILE Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 U.S. Navy (Raytheon) Tuscon, Arizona 72 360 1,100 6 12 30 42 0 0 0 0 2 Raytheon - Tuscon, Arizona 12 60 84 6 12 18 30 0 0 0 0 Remarks: - The displayed 18-month manufacturing production lead time (PLT) pertains to the magazine itself, excluding the associated AIM-9X interceptor. The completed all up-round magazine (AUR-M), a magazine loaded with interceptors, requires a 30-month lead time due to the AIM-9X interceptor's production timeline, as depicted in the P-21 Production Schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 8930C61001 - INDIRECT FIRE PROTECTION CAPABILITY INC ... Army UNCLASSIFIED Page 9 of 17 P-1 Line #6 Volume 1 - 72 === page 103 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8930C61001 / INDIRECT FIRE PROTECTION CAPABILITY INC 2-I Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C62002 / IFPC INC 2-I BLOCK 1 SYSTEM MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total 18 21 50 96 - 96 403.466 299.230 621.252 994.927 - 994.927 Less PY Advance Procurement ($ in Millions) 31.286 Net Procurement (P-1) ($ in Millions) 372.180 Plus CY Advance Procurement ($ in Millions) 31.286 Total Obligation Authority ($ in Millions) 403.466 - - 299.230 - 621.252 - - 299.230 - 994.927 - 621.252 - - 994.927 - 994.927 - - 994.927 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 22,414.778 - 14,249.048 - 12,425.040 - 10,363.823 - - 10,363.823 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost GFE and Support Equipment - - 20.621 - - 37.031 - - 45.271 - - 107.867 - - - - - 107.867 Training Aides, Devices, Simulators & Simulations (TADSS) - - - - - - - - 45.098 - - 40.647 - - - - - 40.647 Subtotal: Recurring Cost - - 20.621 - - 37.031 - - 90.369 - - 148.514 - - - - - 148.514 - - 20.621 - - 37.031 - - 90.369 - - 148.514 - - - - - 148.514 18 192.789 21 204.941 50 396.018 96 668.159 - - - 96 668.159 Subtotal: Flyaway Cost Hardware Cost Recurring Cost IFPC Launchers and Training Launchers (†) 10,710.500 9,759.095 7,920.360 6,959.990 6,959.990 IFPC Contractor SE/ PM - - 21.587 - - 25.185 - - 50.964 - - 53.512 - - - - - 53.512 Subtotal: Recurring Cost - - 214.376 - - 230.126 - - 446.982 - - 721.671 - - - - - 721.671 Non Recurring Cost TAMIR Missiles and Associated Magazines (Reload - 120 EO / 120 EM) 180.763 240 43.383 - - - - - - - - - - - - - - - TAMIR Missiles and Associated Magazines (Training - EM) 188.525 40 7.541 - - - - - - - - - - - - - - - LI 8930C61001 - INDIRECT FIRE PROTECTION CAPABILITY INC ... Army UNCLASSIFIED Page 10 of 17 P-1 Line #6 Volume 1 - 73 === page 104 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8930C61001 / INDIRECT FIRE PROTECTION CAPABILITY INC 2-I Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C62002 / IFPC INC 2-I BLOCK 1 SYSTEM MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Interim CMD (IDDSA) Battle Management Center (BMC) Server Replacement Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) 898.000 2 ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) 1.796 - - - - - - - - - - - - - - - Interim CMD (IDDSA) - ATR realigned FY 2019 Advanced Procurement funding to Base to Procure IDDS-A - - 31.286 - - - - - - - - - - - - - - - IFPC Non-Recurring Production - - - - - 7.215 - - 13.896 - - 23.975 - - - - - 23.975 Subtotal: Non Recurring Cost - - 84.006 - - 7.215 - - 13.896 - - 23.975 - - - - - 23.975 - - 298.382 - - 237.341 - - 460.878 - - 745.646 - - - - - 745.646 - - 17.415 - - 12.541 - - 36.470 - - 60.665 - - - - - 60.665 - - 17.415 - - 12.541 - - 36.470 - - 60.665 - - - - - 60.665 Integrated Logistics Support - - 63.907 - - 2.634 - - 4.708 - - 6.280 - - - - - 6.280 Subtotal: Support - Logistics Cost - - 63.907 - - 2.634 - - 4.708 - - 6.280 - - - - - 6.280 - - 0.302 - - 0.506 - - 6.149 - - 10.010 - - - - - 10.010 - - 0.302 - - 0.506 - - 6.149 - - 10.010 - - - - - 10.010 - - 2.839 - - 9.177 - - 22.678 - - 23.812 - - - - - 23.812 - - 2.839 - - 9.177 - - 22.678 - - 23.812 - - - - - 23.812 18 403.466 21 299.230 50 621.252 96 994.927 - - - 96 994.927 Subtotal: Hardware Cost Support - Initial Spares and Repair Parts Cost Initial Spares and Repair Parts Subtotal: Support - Initial Spares and Repair Parts Cost Support - Logistics Cost Support - New Equipment Training (NET) Cost Equipment Subtotal: Support - New Equipment Training (NET) Cost Support - Program Management Cost Government Management Subtotal: Support - Program Management Cost Gross/Weapon System Cost 22,414.778 14,249.048 12,425.040 10,363.823 10,363.823 Remarks: LI 8930C61001 - INDIRECT FIRE PROTECTION CAPABILITY INC ... Army UNCLASSIFIED Page 11 of 17 P-1 Line #6 Volume 1 - 74 === page 105 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 P-1 Line Item Number / Title: 8930C61001 / INDIRECT FIRE PROTECTION CAPABILITY INC 2-I ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C62002 / IFPC INC 2-I BLOCK 1 SYSTEM MDAP/MAIS Code: - Prior year quantities and unit costs are associated with Tamir interceptors, while quantities and unit costs beginning in FY 2024 are associated with IFPC Inc 2 launchers. - Launcher unit costs decrease from FY 2025 to FY 2027 due to cost efficiencies resulting from a ramp up in launcher quantities. - Training Aides, Devices, Simulators & Simulations (TADSS) includes assets such as the IFPC AUR-M Solder Trainer, AUR-M Load Trainer, EOD System Trainer, and software deliveries for Exportable Interactive Multi-Media Instructions (IMI) System and Operator/Maintainer Trainer Suite (OMT). FY 2027 decrease in TADSS is due to decrease in requirements from FY 2026 to FY 2027. - FY 2027 Contractor SE/PM increases due to an increase in FY 2027 launchers. - FY 2026 and FY 2027 IFPC Non-Recurring Production costs include engineering services, contractor support, and pre-production engineering efforts necessary to ramp up launcher production. These costs encompass specialized tooling and related support. - FY 2027 Initial Spare and Repair Parts increases due to an increase in FY 2027 launchers. - FY 2027 NET increases to support training of the Pacific Deterrence Initiative (PDI) and the FY 2025 launchers. FY 2026 NET only supported the Pacific Deterrence Initiative (PDI) launchers. - FY 2027 Government Management increases to support product office personnel as the program transitions from RDT&E to PROC funding under C62002000. Government Management includes Government Matrix, Matrix OGA, and SETA support. - GFE and Support Equipment includes prime movers, reload vehicles, generators, radios, and radio integration kits. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total 21 50 96 - 96 299.230 621.252 994.927 - 994.927 21 50 96 - 96 299.230 621.252 994.927 - 994.927 indicates the presence of a P-5a LI 8930C61001 - INDIRECT FIRE PROTECTION CAPABILITY INC ... Army UNCLASSIFIED Page 12 of 17 P-1 Line #6 Volume 1 - 75 === page 106 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements IFPC Launchers and Training (†) Launchers IFPC Launchers and Training (†) Launchers IFPC Launchers and Training (†) Launchers IFPC Launchers and Training (†) Launchers (†) O O C P-1 Line Item Number / Title: 8930C61001 / INDIRECT FIRE PROTECTION CAPABILITY INC 2-I Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: C62002 / IFPC INC 2-I BLOCK 1 SYSTEM FY Contractor and Location Method/Type or Funding Vehicle Specs Date Unit Cost Avail Revision Now? Available ($ K) 2024 Dynetics / Huntsville, Alabama SS / FP Redstone Arsenal, AL Sep 2024 Mar 2026 18 10,133.167 N 2025 Dynetics / Huntsville, Alabama SS / FP Redstone Arsenal, AL Jul 2025 Jan 2027 21 9,759.095 N 2026 Dynetics / Huntsville, Alabama SS / FP Redstone Arsenal, AL Apr 2026 Oct 2027 50 7,920.360 N 2027 Dynetics / Huntsville, Alabama SS / FP Redstone Arsenal, AL Mar 2027 Sep 2028 96 6,959.990 N Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 8930C61001 - INDIRECT FIRE PROTECTION CAPABILITY INC ... Army UNCLASSIFIED Page 13 of 17 P-1 Line #6 Volume 1 - 76 === page 107 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8930C61001 / INDIRECT FIRE PROTECTION CAPABILITY INC 2-I Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C62002 / IFPC INC 2-I BLOCK 1 SYSTEM Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P IFPC Launchers and Training Launchers 1 2024 ARMY 18 0 18 1 2025 ARMY 21 0 21 1 2026 ARMY 50 0 50 1 2027 ARMY 96 0 96 A - - - - - - - - - - - - - 18 A - - - 21 50 96 O C T N O V D E C J A N F E B M A R LI 8930C61001 - INDIRECT FIRE PROTECTION CAPABILITY INC ... Army A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 17 S E P O C T N O V D E C J A N F E B P-1 Line #6 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 77 === page 108 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8930C61001 / INDIRECT FIRE PROTECTION CAPABILITY INC 2-I Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C62002 / IFPC INC 2-I BLOCK 1 SYSTEM Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P IFPC Launchers and Training Launchers 1 2024 ARMY 18 0 18 - - - - - 1 2025 ARMY 21 0 21 - - - - - 1 2026 ARMY 50 0 50 1 2027 ARMY 96 0 96 2 2 - 2 4 4 4 0 - - - - - - - - - A - - - - - - - - - 4 4 - 4 - 4 - - A O C T N O V D E C J A N F E B M A R LI 8930C61001 - INDIRECT FIRE PROTECTION CAPABILITY INC ... Army A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 17 S E P O C T N O V D E C J A N F E B P-1 Line #6 M A R 4 - A P R 1 M A Y 0 - - J U N - J U L A U G - 50 - 96 S E P Volume 1 - 78 === page 109 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8930C61001 / INDIRECT FIRE PROTECTION CAPABILITY INC 2-I Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C62002 / IFPC INC 2-I BLOCK 1 SYSTEM Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E IFPC Launchers and Training Launchers 1 2024 ARMY 18 18 0 1 2025 ARMY 21 21 0 1 2026 ARMY 50 0 50 1 2027 ARMY 96 0 96 0 0 5 5 O C T 5 N O V 5 D E C 5 J A N 5 F E B 5 M A R LI 8930C61001 - INDIRECT FIRE PROTECTION CAPABILITY INC ... Army 5 A P R 5 M A Y 5 J U N 0 J U L A U G UNCLASSIFIED Page 16 of 17 8 S E P 8 O C T 8 N O V 8 D E C 8 J A N 8 F E B P-1 Line #6 8 M A R 8 A P R 8 M A Y 8 J U N 8 J U L 8 A U G 0 S E P Volume 1 - 79 === page 110 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8930C61001 / INDIRECT FIRE PROTECTION CAPABILITY INC 2-I Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: C62002 / IFPC INC 2-I BLOCK 1 SYSTEM Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Dynetics - Huntsville, Alabama MSR For 2027 1-8-5 For 2027 MAX For 2027 12 60 96 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 12 18 Total After Oct 1 ALT Prior to Oct 1 30 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 8930C61001 - INDIRECT FIRE PROTECTION CAPABILITY INC ... Army UNCLASSIFIED Page 17 of 17 P-1 Line #6 Volume 1 - 80 0 === page 111 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 10: Surface-to-Air Missile System ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 9214C81200 / MID-RANGE CAPABILITY (MRC) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 43 23 12 44 - 44 239 243 249 250 - 1,103 208.751 152.637 82.407 370.351 - 370.351 1,682.031 1,783.297 1,755.400 1,796.607 - 7,831.481 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 208.751 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) - 208.751 - 152.637 - 82.407 - - 152.637 - 370.351 - 82.407 - - 370.351 - 370.351 - - 370.351 - - 1,682.031 - 1,783.297 - - 1,755.400 - 1,682.031 To FY 2031 Complete - 1,796.607 - 1,783.297 - - - 1,755.400 Total 7,831.481 - 1,796.607 - - 7,831.481 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 4,854.674 6,636.391 6,867.250 8,417.068 - 8,417.068 7,037.787 7,338.671 7,049.799 7,186.428 - - 7,100.164 Description: The FY 2027 request for Mid-Range Capability (MRC) includes $370,351 thousand of discretionary and $2,331,282 thousand of mandatory for a total of $2,701,633 thousand. The mandatory funds for MRC procures a total of 234 Tomahawk missiles and 110 SM-6 missiles to support Munitions Acceleration Council (MAC) expanded production rate. This budget line procures Tomahawk and Standard Missile-6 (SM-6) missiles to meet the Army Total Munition Requirement and procures MRC Ground Support Equipment end items and components. The Mid-Range Capability is a ground launched, long-range precision fires offensive weapon system to defeat Anti-Access/Area-Denial (A2/AD) threats and other high value targets to enable warfighter dominance in support of Long-Range Precision Fires, Multi-Domain Operations, and Joint Force objectives. Each battery consists of four launchers equipped with a Vertical Launching System capable of carrying four of the U.S. Navy's Tomahawk and/or SM-6 with a basic load of 16 missiles, one Battery Operations Center (BOC) with support vehicles, and a reload capability. Tomahawk missiles procured on Navy contracts includes the Block V modernized Tomahawk Land Attack Missile (TLAM) and beginning in FY25, the Army is procuring Block Va Maritime Strike Tomahawks (MST). SM-6 missiles procured on Navy contracts will be in the Block IA configuration. The MRC SM-6 missiles provide land and naval surface targeting capability. SM-6 missiles are procured as an all up round including guidance, ordnance, MK 72 Boosters, and a MK 21 Canister. Secondary Distribution Army FY 2025 Quantity Total Obligation Authority Total: Quantity LI 9214C81200 - MID-RANGE CAPABILITY (MRC) Army FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 23 12 44 - 44 239 243 249 250 152.637 82.407 370.351 - 370.351 1,682.031 1,783.297 1,755.400 1,796.607 23 12 44 - 44 239 243 249 250 UNCLASSIFIED Page 1 of 23 P-1 Line #7 Volume 1 - 81 === page 112 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 10: Surface-to-Air Missile System ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 9214C81200 / MID-RANGE CAPABILITY (MRC) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Secondary Distribution Secondary Distribution FY 2025 Total Obligation Authority LI 9214C81200 - MID-RANGE CAPABILITY (MRC) Army 152.637 FY 2026 82.407 FY 2027 Base FY 2027 OOC 370.351 UNCLASSIFIED Page 2 of 23 FY 2027 Total - FY 2028 370.351 1,682.031 P-1 Line #7 FY 2029 1,783.297 FY 2030 FY 2031 1,755.400 1,796.607 Volume 1 - 82 === page 113 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 10: Surface-to-Air Missile System ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 9214C81200 / MID-RANGE CAPABILITY (MRC) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits P-5 C81214 / TOMAHAWK AND TOMAHAWK MISSION PLANNING CENTER (TMP P-5a, P-21 P-5 C81215 / MID-RANGE CAPABILITY GROUND SUPPORT EQUIPMENT P-5a, P-21 P-5 C81216 / STANDARD MISSILE-6 (SM-6) P-5a, P-21 P-40 Total Gross/Weapon System Cost ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 36 / 169.519 23 / 152.637 6 / 42.874 30 / 218.173 - / - - - / - - / - - / 4.801 30 / 218.173 / 69.768 - / - - 7 / 39.232 0/ - 6 / 34.732 14 / 82.410 - / - 14 / 82.410 / 69.768 43 / 208.751 23 / 152.637 12 / 82.407 44 / 370.351 - / - 44 / 370.351 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: C81214 FY 2027 funding supports the procurement of 30 MSTs and MK14 cannisters, along with program management costs. Not reflected on the forms, the FY 2027 request also includes $1,687.032M of mandatory funding. C81215 FY 2027 funding supports production of 8 Enhanced Reloaders, 2 Reduced BOC Footprint (RBFs) to upgrade command and control node of fielded batteries, and associated Government Furnished Equipment along with MRC GSE systems engineering and program management costs. C81216 FY 2027 funding supports the procurement of 14 SM-6 Block IA configuration missiles. Not reflected on the forms, the FY 2027 request also includes $644.250M of mandatory funding. This funding line is directly aligned to the Army Long-Range Precision Fires modernization priority and the requirements of the MRC Abbreviated-Capabilities Development Document. The Army intends to convert any price advantage created through Navy contract negotiations, other service procurement, and/or foreign military sales to support procurement of additional MRC munitions. LI 9214C81200 - MID-RANGE CAPABILITY (MRC) Army UNCLASSIFIED Page 3 of 23 P-1 Line #7 Volume 1 - 83 === page 114 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 9214C81200 / MID-RANGE CAPABILITY (MRC) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C81214 / TOMAHAWK AND TOMAHAWK MISSION PLANNING CENTER (TMP MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) FY 2025 FY 2026 30 - 30 169.519 152.637 42.874 218.173 - 218.173 - - 152.637 - Total Obligation Authority ($ in Millions) FY 2027 Total 6 169.519 Plus CY Advance Procurement ($ in Millions) FY 2027 OOC 23 - Net Procurement (P-1) ($ in Millions) FY 2027 Base 36 - 169.519 - 42.874 - 152.637 - 218.173 - 42.874 - - 218.173 - 218.173 - - 218.173 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 4,708.861 - 6,636.391 - 7,145.667 - 7,272.433 - - 7,272.433 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost (†) Tactical Tomahawk 2,983.475 Tactical Tomahawk Classified Maritime Strike (†) Tomahawk MK14 Container (†) Subtotal: Recurring Cost Subtotal: Flyaway Cost 40 119.339 - - 41.895 - - - - - - - - - - - 2,577.263 19 48.968 - 23.774 19 69.825 3,490.000 5 17.450 - - - 207.600 5 1.038 161.234 - - 142.567 - - 40.053 161.234 - - 142.567 - - 40.053 - 8.285 - - 10.070 - - - 8.285 - - 10.070 - - 36 169.519 23 152.637 3,675.000 2,842.600 - 5 - 14.213 30 65.351 - - - - 29.099 - - - 3,823.467 30 114.704 - - - 204.800 30 6.144 - - - - - 215.298 - - - - - 215.298 - - - 2.821 - - 2.875 - - 2.821 - - 2.875 - 30 218.173 - 7.352 2,178.367 - 2,178.367 30 65.351 - 29.099 3,823.467 30 114.704 204.800 30 6.144 - - 215.298 - - 215.298 - - - 2.875 - - - - 2.875 - - 30 218.173 - Support - Program Management Cost Government Management Subtotal: Support - Program Management Cost Gross/Weapon System Cost 4,708.861 6,636.391 7,145.667 6 42.874 7,272.433 7,272.433 Remarks: Maritime Strike line represents kits to convert Tactical Tomahawk (Block V) into Maritime Strike Tomahawk (Block Va). Will be delivered as an All-Up Round (AUR). LI 9214C81200 - MID-RANGE CAPABILITY (MRC) Army UNCLASSIFIED Page 4 of 23 P-1 Line #7 Volume 1 - 84 === page 115 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 P-1 Line Item Number / Title: 9214C81200 / MID-RANGE CAPABILITY (MRC) ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C81214 / TOMAHAWK AND TOMAHAWK MISSION PLANNING CENTER (TMP MDAP/MAIS Code: The Army intends to convert any price advantage created through Navy contract negotiations, other service procurement, and/or foreign military sales to procure additional MRC munitions. P-5 quantities (Prior: 40 | FY 2025: 19 | FY 2026: 5 | FY 2027: 30) are correct. P-40 quantities are fed from compo quantity database, which is locked and unable to edit. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total 23 6 30 - 30 152.637 42.874 218.173 - 218.173 23 6 30 - 30 152.637 42.874 218.173 - 218.173 indicates the presence of a P-5a LI 9214C81200 - MID-RANGE CAPABILITY (MRC) Army UNCLASSIFIED Page 5 of 23 P-1 Line #7 Volume 1 - 85 === page 116 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 O O C Cost Elements FY Contractor and Location Method/Type or Funding Vehicle Item Number / Title [DODIC]: C81214 / TOMAHAWK AND TOMAHAWK MISSION PLANNING CENTER (TMP Location of PCO Award Date Date of First Delivery Tactical Tomahawk (†) 2025 Raytheon Missile System / Tucson, AZ SS / FPIF NAVAIR Dec 2025 Dec 2028 Tactical Tomahawk (†) 2026 Raytheon Missile System / Tucson, AZ SS / FPIF NAVAIR May 2026 Tactical Tomahawk (†) 2027 Raytheon Missile System / Tucson, AZ SS / FPIF NAVAIR May 2027 (†) 2025 Raytheon Missile System / Tucson, AZ SS / FPIF NAVAIR Mar 2026 (†) 2026 Raytheon Missile System / Tucson, AZ SS / FPIF NAVAIR Mar 2026 (†) 2027 Raytheon Missile System / Tucson, AZ SS / FPIF NAVAIR May 2027 Tomahawk MK14 Container (†) 2026 Raytheon Missile System / Tucson, AZ SS / FPIF NAVAIR May 2026 Tomahawk MK14 Container (†) 2027 Raytheon Missile System / Tucson, AZ SS / FPIF NAVAIR May 2027 Maritime Strike Maritime Strike Maritime Strike (†) P-1 Line Item Number / Title: 9214C81200 / MID-RANGE CAPABILITY (MRC) Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) 19 2,577.263 Y May 2029 5 2,842.600 Y May 2030 30 2,178.367 Y Mar 2029 19 3,675.000 Y Mar 2029 5 3,490.000 Y May 2030 30 3,823.467 Y May 2029 5 207.600 Y May 2030 30 204.800 Y RFP Issue Date indicates the presence of a P-21 Remarks: The procurement and delivery of Army missiles is based on estimated contract awards and delivery timelines leveraging the Navy's Tomahawk production contract that incorporates Army, Navy, and FMS. Army DD250s as a fully delivered AUR in a canister. The Army intends to convert any price advantage created through Navy contract negotiations, other service procurement, and/or foreign military sales to procure additional MRC munitions. This budget line is planning for a Multi-year Procurement contract starting in FY 2027 with additional information as provided in the MYP1 through 4 exhibits. LI 9214C81200 - MID-RANGE CAPABILITY (MRC) Army UNCLASSIFIED Page 6 of 23 P-1 Line #7 Volume 1 - 86 === page 117 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 9214C81200 / MID-RANGE CAPABILITY (MRC) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C81214 / TOMAHAWK AND TOMAHAWK MISSION PLANNING CENTER (TMP Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Tactical Tomahawk Prior Years Deliveries: 40 1 2025 ARMY 19 0 19 1 2026 ARMY 5 0 5 1 2027 ARMY 30 0 30 A - - - - - - - - - - - - - - - - - - - - - - A - - - - - - - - - - - - - - - - - 19 5 A - - - - - 30 19 Maritime Strike 2 2025 ARMY 19 0 19 A - - - - - - - - - - - - - - - - - - - 2 2026 ARMY 5 0 5 A - - - - - - - - - - - - - - - - - - - 5 2 2027 ARMY 30 0 30 A - - - - - 30 - - - - - 5 A - - - - - 30 Tomahawk MK14 Container 3 2026 ARMY 5 0 5 3 2027 ARMY 30 0 30 A O C T N O V D E C LI 9214C81200 - MID-RANGE CAPABILITY (MRC) Army J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #7 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 87 === page 118 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 9214C81200 / MID-RANGE CAPABILITY (MRC) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C81214 / TOMAHAWK AND TOMAHAWK MISSION PLANNING CENTER (TMP Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Tactical Tomahawk Prior Years Deliveries: 40 1 2025 ARMY 19 0 19 - - - - - - - - - - - - - - 1 2026 ARMY 5 0 5 - - - - - - - - - - - - - - - 5 - 5 - 5 - 4 - 0 1 2027 ARMY 30 0 30 - - - - - - - - - - - - - - - - - - - 5 0 - - - - - 30 Maritime Strike 2 2025 ARMY 19 0 19 - - - - - - - - - - - - - - - - - 8 2 2026 ARMY 5 0 5 - - - - - - - - - - - - - - - - - 5 8 2 2027 ARMY 30 0 30 - - - - - - - - - - - - - - - - - - - 3 0 0 - - - - - 30 - - - - 30 Tomahawk MK14 Container 3 2026 ARMY 5 0 5 - - - - - - - - - - - - - - - - - - - 3 2027 ARMY 30 0 30 - - - - - - - - - - - - - - - - - - - O C T N O V D E C LI 9214C81200 - MID-RANGE CAPABILITY (MRC) Army J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #7 M A R A P R 5 0 M A Y J U N J U L A U G S E P Volume 1 - 88 === page 119 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 9214C81200 / MID-RANGE CAPABILITY (MRC) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C81214 / TOMAHAWK AND TOMAHAWK MISSION PLANNING CENTER (TMP Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Tactical Tomahawk Prior Years Deliveries: 40 1 2025 ARMY 19 19 0 1 2026 ARMY 5 5 0 1 2027 ARMY 30 0 30 0 0 - - - - - - - 5 5 5 5 5 5 0 Maritime Strike 2 2025 ARMY 19 19 0 2 2026 ARMY 5 5 0 2 2027 ARMY 30 0 30 0 0 - - - - - - - 8 8 8 6 - - - - - - - 5 5 5 5 0 Tomahawk MK14 Container 3 2026 ARMY 5 5 0 3 2027 ARMY 30 0 30 0 O C T N O V D E C LI 9214C81200 - MID-RANGE CAPABILITY (MRC) Army J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 23 5 S E P 5 O C T 0 N O V D E C J A N F E B P-1 Line #7 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 89 === page 120 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 9214C81200 / MID-RANGE CAPABILITY (MRC) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: C81214 / TOMAHAWK AND TOMAHAWK MISSION PLANNING CENTER (TMP Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Raytheon Missile System Tucson, AZ 90 250 530 0 0 0 0 0 6 36 42 2 Raytheon Missile System Tucson, AZ 90 250 530 0 0 0 0 0 6 36 42 3 Raytheon Missile System Tucson, AZ 90 250 530 0 0 0 0 0 6 36 42 Remarks: The delivery of Army missiles is based on an estimated schedule that incorporates Army, Navy, and FMS deliveries from the Tomahawk production contract. The Army intends to convert any price advantage created through Navy contract negotiations, other service procurement, and/or foreign military sales to procure additional MRC munitions. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 9214C81200 - MID-RANGE CAPABILITY (MRC) Army UNCLASSIFIED Page 10 of 23 P-1 Line #7 Volume 1 - 90 === page 121 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 9214C81200 / MID-RANGE CAPABILITY (MRC) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C81215 / MID-RANGE CAPABILITY GROUND SUPPORT EQUIPMENT MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - 4.801 69.768 - 69.768 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - 4.801 69.768 - 69.768 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - 4.801 69.768 - 69.768 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Ground Support Equipment Original Equipment Manufacturer (OEM) Reduced BOC - - - - - - - - - 13,133.000 2 26.266 - - - 13,133.000 2 26.266 - - - - - - - - - 2,480.625 8 19.845 - - - 2,480.625 8 19.845 Ground Support Equipment Government Furnished Equipment (GFE) - - - - - - - - - - - 11.682 - - - - - 11.682 Subtotal: Recurring Cost - - - - - - - - - - - 57.793 - - - - - 57.793 - - - - - - - - - - - 57.793 - - - - - 57.793 Depot Stand Up - - - - - - - - - - - 2.100 - - - - - 2.100 Subtotal: Non Recurring Cost - - - - - - - - - - - 2.100 - - - - - 2.100 Footprint (RBF) (†) Ground Support Equipment Original Equipment Manufacturer (OEM) - (†) Enhanced Reloader Subtotal: Hardware Cost Logistics Cost Non Recurring Cost LI 9214C81200 - MID-RANGE CAPABILITY (MRC) Army UNCLASSIFIED Page 11 of 23 P-1 Line #7 Volume 1 - 91 === page 122 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 9214C81200 / MID-RANGE CAPABILITY (MRC) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C81215 / MID-RANGE CAPABILITY GROUND SUPPORT EQUIPMENT MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - - - - - - - - - - 2.100 - - - - - 2.100 - - - - - - - - 4.801 - - 9.875 - - - - - 9.875 Subtotal: Support - Program Management Cost - - - - - - - - 4.801 - - 9.875 - - - - - 9.875 Gross/Weapon System Cost - - - - - - - - 4.801 - - 69.768 - - - - - 69.768 Subtotal: Logistics Cost Support - Program Management Cost Government Management Remarks: The Qty 2 Reduced BOC Footprint (RBFs) in FY 2027 will replace previously fielded BOCs. The Enhanced Reloaders (Qty 4 per Battery) will replace Qty 1 trailer included in previously fielded batteries. Secondary Distribution Army Total: Secondary Distribution (†) FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total Quantity - - - - - Total Obligation Authority - 4.801 69.768 - 69.768 Quantity - - - - - Total Obligation Authority - 4.801 69.768 - 69.768 indicates the presence of a P-5a LI 9214C81200 - MID-RANGE CAPABILITY (MRC) Army UNCLASSIFIED Page 12 of 23 P-1 Line #7 Volume 1 - 92 === page 123 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 O O C Cost Elements Ground Support Equipment Original Equipment Manufacturer (OEM) Reduced BOC Footprint (RBF) (†) (OEM) - Enhanced Reloader (†) Method/Type or Funding Vehicle Item Number / Title [DODIC]: C81215 / MID-RANGE CAPABILITY GROUND SUPPORT EQUIPMENT Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty FY Contractor and Location 2027 Lockheed Martin Corporation (RBF) / Moorestown, NJ SS / CPFF Redstone Arsenal, AL Mar 2027 Mar 2029 2 13,133.000 Y 2027 Lockheed Martin Corporation (Enhanced Reloader) / Moorestown, NJ SS / CPFF Redstone Arsenal, AL Mar 2027 Mar 2029 8 2,480.625 Y (†) Ground Support Equipment Original Equipment Manufacturer P-1 Line Item Number / Title: 9214C81200 / MID-RANGE CAPABILITY (MRC) (Each) RFP Issue Date indicates the presence of a P-21 Remarks: This budget line is planning for a Multi-year Procurement contract starting in FY 2027 with additional information as provided in the MYP1 through 4 exhibits. LI 9214C81200 - MID-RANGE CAPABILITY (MRC) Army UNCLASSIFIED Page 13 of 23 P-1 Line #7 Volume 1 - 93 === page 124 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 9214C81200 / MID-RANGE CAPABILITY (MRC) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C81215 / MID-RANGE CAPABILITY GROUND SUPPORT EQUIPMENT Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Ground Support Equipment - Original Equipment Manufacturer (OEM) Reduced BOC Footprint (RBF) 1 2027 ARMY 2 0 2 A - - - - - - - - - - - - - - - - - - - 2 - 8 Ground Support Equipment - Original Equipment Manufacturer (OEM) - Enhanced Reloader 2 2027 ARMY 8 0 8 A O C T N O V D E C LI 9214C81200 - MID-RANGE CAPABILITY (MRC) Army J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #7 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 94 === page 125 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 9214C81200 / MID-RANGE CAPABILITY (MRC) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C81215 / MID-RANGE CAPABILITY GROUND SUPPORT EQUIPMENT Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Ground Support Equipment - Original Equipment Manufacturer (OEM) Reduced BOC Footprint (RBF) 1 2027 ARMY 2 0 2 - - - - - 1 1 0 Ground Support Equipment - Original Equipment Manufacturer (OEM) - Enhanced Reloader 2 2027 ARMY 8 0 8 O C T N O V D E C LI 9214C81200 - MID-RANGE CAPABILITY (MRC) Army J A N F E B 2 M A R 2 A P R 2 M A Y 2 J U N 0 J U L A U G UNCLASSIFIED Page 15 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #7 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 95 === page 126 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 9214C81200 / MID-RANGE CAPABILITY (MRC) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: C81215 / MID-RANGE CAPABILITY GROUND SUPPORT EQUIPMENT Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Lockheed Martin Corporation (RBF) - Moorestown, NJ 1 1 2 3 3 24 27 3 3 24 27 2 Lockheed Martin Corporation (Enhanced Reloader) Moorestown, NJ 1 1 8 3 3 24 27 3 3 24 27 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 9214C81200 - MID-RANGE CAPABILITY (MRC) Army UNCLASSIFIED Page 16 of 23 P-1 Line #7 Volume 1 - 96 === page 127 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 9214C81200 / MID-RANGE CAPABILITY (MRC) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C81216 / STANDARD MISSILE-6 (SM-6) MDAP/MAIS Code: Resource Summary Prior Years FY 2025 Procurement Quantity (Units in Each) FY 2026 7 Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base 0 39.232 - FY 2027 OOC FY 2027 Total 6 14 - 14 34.732 82.410 - 82.410 - - - - - - 39.232 - 34.732 82.410 - 82.410 - - - - - - 39.232 - 34.732 82.410 - 82.410 - - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 5,604.571 - - 5,788.667 5,886.429 - - 5,886.429 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost (†) SM-6 5,307.571 Subtotal: Recurring Cost Subtotal: Flyaway Cost 37.153 - - - 14 76.967 - - - 14 76.967 - - 7 37.153 - - - 5,448.667 - - 6 32.692 32.692 5,497.643 - - 76.967 - - - 5,497.643 - - 76.967 - - 37.153 - - - - - 32.692 - - 76.967 - - - - - 76.967 Hardware Cost Recurring Cost Canister SM-6 297.000 Subtotal: Recurring Cost Subtotal: Hardware Cost 2.079 - - - 14 4.711 - - - 14 4.711 - - 7 2.079 - - - 307.000 - - 6 1.842 1.842 336.500 - - 4.711 - - - 336.500 - - 4.711 - - 2.079 - - - - - 1.842 - - 4.711 - - - - - 4.711 - - - - - - - - 0.198 - - 0.732 - - - - - 0.732 - - - - - - - - 0.198 - - 0.732 - - - - - 0.732 39.232 - 14 82.410 - - - 14 82.410 Support - Program Management Cost Government Management Subtotal: Support - Program Management Cost Gross/Weapon System Cost 5,604.571 7 0 - 5,788.667 6 34.732 5,886.429 5,886.429 Remarks: The Army plans to procure SM-6 Block IA missiles. The Army intends to convert any price advantage created through Navy contract negotiations, other service procurement, and/or foreign military sales to procure additional MRC munitions. LI 9214C81200 - MID-RANGE CAPABILITY (MRC) Army UNCLASSIFIED Page 17 of 23 P-1 Line #7 Volume 1 - 97 === page 128 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 P-1 Line Item Number / Title: 9214C81200 / MID-RANGE CAPABILITY (MRC) ID Code (A=Service Ready, B=Not Service Ready) : Secondary Distribution Army Total: Secondary Distribution (†) Item Number / Title [DODIC]: C81216 / STANDARD MISSILE-6 (SM-6) MDAP/MAIS Code: FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total Quantity - 6 14 - 14 Total Obligation Authority - 34.732 82.410 - 82.410 6 14 - 14 34.732 82.410 - 82.410 Quantity Total Obligation Authority 0 - indicates the presence of a P-5a LI 9214C81200 - MID-RANGE CAPABILITY (MRC) Army UNCLASSIFIED Page 18 of 23 P-1 Line #7 Volume 1 - 98 === page 129 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 FY Contractor and Location (†) 2026 Raytheon Missile System / Tucson, AZ SS / FFP NAVSEA Mar 2026 Mar 2029 6 5,448.667 Y (†) 2027 Raytheon Missile System / Tucson, AZ SS / FFP NAVSEA Mar 2027 Mar 2030 14 5,497.643 Y SM-6 SM-6 (†) Item Number / Title [DODIC]: C81216 / STANDARD MISSILE-6 (SM-6) Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 9214C81200 / MID-RANGE CAPABILITY (MRC) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date indicates the presence of a P-21 Remarks: The Army plans to procure Block IA SM-6 missiles. The Army intends to convert any price advantage created through Navy contract negotiations, other service procurement, and/or foreign military sales to procure additional MRC munitions. This budget line is planning for a Multi-year Procurement contract starting in FY 2027 with additional information as provided in the MYP1 through 4 exhibits. LI 9214C81200 - MID-RANGE CAPABILITY (MRC) Army UNCLASSIFIED Page 19 of 23 P-1 Line #7 Volume 1 - 99 === page 130 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 9214C81200 / MID-RANGE CAPABILITY (MRC) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C81216 / STANDARD MISSILE-6 (SM-6) Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P SM-6 Prior Years Deliveries: 7 1 2026 ARMY 6 0 6 1 2027 ARMY 14 0 14 A O C T N O V D E C LI 9214C81200 - MID-RANGE CAPABILITY (MRC) Army J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 20 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #7 - - - - - - - 6 A - - - - - - - 14 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 100 === page 131 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 9214C81200 / MID-RANGE CAPABILITY (MRC) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C81216 / STANDARD MISSILE-6 (SM-6) Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P SM-6 Prior Years Deliveries: 7 1 2026 ARMY 6 0 6 - - - - - - - - - - - - - - - - - 1 2027 ARMY 14 0 14 - - - - - - - - - - - - - - - - - O C T N O V D E C LI 9214C81200 - MID-RANGE CAPABILITY (MRC) Army J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 21 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #7 6 0 M A R A P R M A Y J U N J U L A U G - 14 S E P Volume 1 - 101 === page 132 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 9214C81200 / MID-RANGE CAPABILITY (MRC) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C81216 / STANDARD MISSILE-6 (SM-6) Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E SM-6 Prior Years Deliveries: 7 1 2026 ARMY 6 6 0 1 2027 ARMY 14 0 14 0 O C T N O V D E C LI 9214C81200 - MID-RANGE CAPABILITY (MRC) Army J A N F E B 10 M A R 4 A P R 0 M A Y J U N J U L A U G UNCLASSIFIED Page 22 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #7 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 102 === page 133 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 9214C81200 / MID-RANGE CAPABILITY (MRC) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 10 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: C81216 / STANDARD MISSILE-6 (SM-6) Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Raytheon Missile System Tucson, AZ MSR For 2027 1-8-5 For 2027 MAX For 2027 125 125 250 ALT Prior to Oct 1 ALT After Oct 1 3 Reorder Manufacturing PLT 6 36 Total After Oct 1 ALT Prior to Oct 1 42 ALT After Oct 1 3 Manufacturing PLT 6 Total After Oct 1 36 42 Remarks: The procurement and delivery of Army missiles is based on estimated contract awards and delivery timelines leveraging the Navy's SM-6 production contract that incorporates Army, Navy, and FMS. The Army intends to convert any price advantage created through Navy contract negotiations, other service procurement, and/or foreign military sales to support procurement of additional MRC munitions. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 9214C81200 - MID-RANGE CAPABILITY (MRC) Army UNCLASSIFIED Page 23 of 23 P-1 Line #7 Volume 1 - 103 === page 134 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 9216C82200 / COUNTER SMALL UNMANNED AERIAL SYSTEM INTERCEPT Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 10: Surface-to-Air Missile System Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) - Gross/Weapon System Cost ($ in Millions) - Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) - Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) - FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 329.227 329.227 329.227 To FY 2031 Complete Total 329.227 329.227 329.227 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - 171.116 171.116 Description: This funding line supports Homeland Defense and is an Air and Missile Defense Army Modernization priority. Interceptors, such as the Coyote kinetic and non-kinetic interceptors, are key components of the Counter-small Unmanned Aircraft Systems (C-sUAS) system-of-systems. C-sUAS was initiated in JUN 2016 in response to Joint Urgent Operational Need (JUON) CC-0558, to detect, track, classify, evaluate, and defeat Groups 1 and 2 UAS threats. On 19 NOV 2021, the Army Requirements Oversight Council approved C-sUAS Capability Development Document (CDD) Increment 1 for a C-sUAS capability at Operational Divisions (now C-UAS Batteries). On 1 FEB 2022, the Chief of Staff of the Army (CSA) accelerated C-sUAS procurement into FY 2022 (from FY 2023) and specified the systems and quantities for each battery. This CSA guidance was documented in a 2 FEB 2022 Department of the Army Military Operations Fires Division (DAMO-Fires) memorandum; Coyote is one of the systems designated by the CSA. In a 30 MAR 2022 Acquisition Decision Memorandum (ADM), the Army Acquisition Executive (AAE) authorized use of the Major Capability Acquisition (MCA) pathway for five separate Acquisition Category III programs, including Coyote, to meet the C-sUAS CDD requirements. Following an 8 MAY 2024 program initiation briefing to the Milestone Decision Authority, the Coyote program was approved for entry into the MCA pathway at post-Full Rate Production (FRP). The Coyote is a ground-launched, radar-guided interceptor (kinetic and non-kinetic variants), designed to defeat Groups 1-3 UAS threats. The kinetic variant has a turbine engine, forward-firing warhead, and onboard radio frequency seeker, which provides high speed and maneuverability against Groups 1-3 UAS threats. The non-kinetic variant is designed to defeat multiple Groups 1 & 2 UAS threats during a single engagement. The Coyote system includes the interceptor and launcher, configured for expeditionary and mobile platforms. Prior C-sUAS Intercept procurement funding resides in line items BZ0501 INDIRECT FIRE PROTECTION FAMILY OF SYSTEMS and AD0500 COUNTER SMALL UNMANNED AERIAL SYSTEM. Beginning FY 2026, funding has been realigned back to the AD0500 funding line. Secondary Distribution Army Quantity Total Obligation Authority Total: Quantity FY 2025 FY 2027 Base FY 2026 - 329.227 - LI 9216C82200 - COUNTER SMALL UNMANNED AERIAL SYSTEM INT... Army FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - - - - - - - - - - - - - - - - UNCLASSIFIED Page 1 of 2 P-1 Line #8 Volume 1 - 104 === page 135 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 9216C82200 / COUNTER SMALL UNMANNED AERIAL SYSTEM INTERCEPT Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 10: Surface-to-Air Missile System Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Secondary Distribution Secondary Distribution Total Obligation Authority FY 2025 FY 2027 Base FY 2026 329.227 - FY 2027 OOC - FY 2027 Total - FY 2028 - FY 2029 - FY 2030 - FY 2031 - - Justification: There is no FY 2027 funding request for this funding line. LI 9216C82200 - COUNTER SMALL UNMANNED AERIAL SYSTEM INT... Army UNCLASSIFIED Page 2 of 2 P-1 Line #8 Volume 1 - 105 === page 136 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 20: Air-To-Surface 2605C70302 / Joint Air-to-Ground MSLS (JAGM) Missile System Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0605450A Line Item MDAP/MAIS Code: 355 Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 5,549 1,000 178 269 - 269 320 158 364 317 13,609 21,764 1,678.446 334.102 84.667 104.059 - 104.059 114.016 74.511 120.034 121.256 5,021.811 7,652.902 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 64.456 1,613.990 - 64.456 1,678.446 - 334.102 - - 84.667 - 334.102 - 104.059 - 84.667 - - 104.059 - 104.059 - - 104.059 - - 114.016 - 74.511 - - 120.034 - 114.016 To FY 2031 Complete 121.256 - 74.511 5,021.811 - 120.034 121.256 5,021.811 Total 64.456 7,588.446 64.456 7,652.902 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 302.477 334.102 475.657 386.836 - 386.836 356.300 471.589 329.764 382.511 369.007 351.631 Description: The AGM-179 Joint Air-to-Ground Missile (JAGM) program is an Army-led, Acquisition Category (ACAT) 1C Major Defense Acquisition Program (MDAP) with joint interest from Navy, Marine Corps, Air Force, and Foreign Military Allies. JAGM is the Army's, multi-mode, air-to-ground munition replacing HELLFIRE (HF) and HF Longbow tactical missiles. JAGM is a full-rate production item that addresses five Army Aviation extremely high risk and two high risk capability gaps. JAGM is the only munition that is effective against all target sets listed in the US Army Aviation Lethality Strategy. JAGM is the primary precision munition for attack helicopter operations and the only precision missile in production that is qualified airworthy for Army Aviation attack helicopter operations. JAGM is used for destruction of high-value land and maritime targets, moving or stationary, launches from any platform currently firing HF from a US Army-issued M299 launcher. The JAGM range is 8km, and the manufacturer has demonstrated range capability to 16km, the objective range requirement. 16km would provide missile parity with Apache Helicopter advanced sensors and make Apache crews capable of engaging Army Aviation medium range targets. JAGM's dual-mode seeker utilizes a Millimeter Wave (MMW) radar and Semi-Active Laser (SAL), multi-mode guidance section. The multi-mode capability provides fire-and-forget and precision-point targeting as well as unique, blended modes of each, for improved capability over legacy munitions. The JAGM Captive Air Training Missile (CATM) is an airworthy training missile that consists of a JAGM guidance section that receives crew inputs for target engagement training and to evaluate gunnery requirements without expending live ordinance. Secondary Distribution Army FY 2025 Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 2605C70302 - Joint Air-to-Ground MSLS (JAGM) Army FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 1,000 178 269 - 269 320 158 364 317 334.102 84.667 104.059 - 104.059 114.016 74.511 120.034 121.256 1,000 178 269 - 269 320 158 364 317 334.102 84.667 104.059 - 104.059 114.016 74.511 120.034 121.256 UNCLASSIFIED Page 1 of 10 P-1 Line #9 Volume 1 - 106 === page 137 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 20: Air-To-Surface 2605C70302 / Joint Air-to-Ground MSLS (JAGM) Missile System Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0605450A Line Item MDAP/MAIS Code: 355 Exhibits Schedule Exhibit Type Title* P-5 C70302 / Joint Air-to-Ground MSLS (JAGM) P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code P-5a, P-21 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 5,549 / 1,678.446 1,000 / 334.102 178 / 84.667 269 / 104.059 - / - 269 / 104.059 5,549 / 1,678.446 1,000 / 334.102 178 / 84.667 269 / 104.059 - / - 269 / 104.059 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Total FY 2027 procurement dollars in the amount of $104.059 million support the procurement of 269 missiles and 25 Captive Air Training Missiles (CATM). Funding increase from FY 2026 to FY 2027 is due to increased missile quantities. The Army intends to convert any price advantage created through contract negotiations, other service procurement, and Foreign Military Sales (FMS) to increase procurement of JAGM and address safety, reliability, affordability, producibility and obsolescence. The Air-to-Ground Missile Systems Product Office is the procurement agent for all services. The Army Acquisition Objective is 20,303. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 2605C70302 - Joint Air-to-Ground MSLS (JAGM) Army UNCLASSIFIED Page 2 of 10 P-1 Line #9 Volume 1 - 107 === page 138 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2605C70302 / Joint Air-to-Ground MSLS (JAGM) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 20 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C70302 / Joint Air-to-Ground MSLS (JAGM) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2026 FY 2027 Total 178 269 - 269 1,678.446 334.102 84.667 104.059 - 104.059 64.456 - 1,613.990 Plus CY Advance Procurement ($ in Millions) - 334.102 64.456 Total Obligation Authority ($ in Millions) FY 2027 OOC 1,000 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2027 Base 5,549 - 1,678.446 - 84.667 - 334.102 - 104.059 - 84.667 - - 104.059 - 104.059 - - 104.059 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 302.477 - 334.102 - 475.657 - 386.836 - - 386.836 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost All Up Rounds (†) (AUR) 229.528 5,730 1,315.194 286.584 1,000 286.584 249.506 178 44.412 241.546 269 64.976 - - - 241.546 269 64.976 9.269 Recurring Engineering - - 109.563 - - 6.657 - - 9.093 - - 9.269 - - - - - Acceptance Testing - - 9.188 - - 1.038 - - 1.831 - - 1.867 - - - - - 1.867 Subtotal: Recurring Cost - - 1,433.945 - - 294.279 - - 55.336 - - 76.112 - - - - - 76.112 - - 1,433.945 - - 294.279 - - 55.336 - - 76.112 - - - - - 76.112 - - 2.863 - - 0.070 - - 0.017 - - 0.025 - - - - - 0.025 - - 2.863 - - 0.070 - - 0.017 - - 0.025 - - - - - 0.025 - - 3.698 - - - - - - - - - - - - - - - - - 3.698 - - - - - - - - - - - - - - - Production Engineering - - 98.401 - - 11.345 - - 10.110 - - 9.964 - - - - - 9.964 Subtotal: Support Production Engineering Cost - - 98.401 - - 11.345 - - 10.110 - - 9.964 - - - - - 9.964 Subtotal: Flyaway Cost Support - Fielding Cost Fielding Subtotal: Support - Fielding Cost Support - Initial Spares and Repair Parts Cost Initial Spares and Repair Parts Subtotal: Support - Initial Spares and Repair Parts Cost Support - Production Engineering Cost Support - Program Management Cost LI 2605C70302 - Joint Air-to-Ground MSLS (JAGM) Army UNCLASSIFIED Page 3 of 10 P-1 Line #9 Volume 1 - 108 === page 139 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2605C70302 / Joint Air-to-Ground MSLS (JAGM) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 20 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C70302 / Joint Air-to-Ground MSLS (JAGM) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Government Management Subtotal: Support - Program Management Cost Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - 88.994 - - 13.247 - - 13.819 - - 12.822 - - - - - 12.822 - - 88.994 - - 13.247 - - 13.819 - - 12.822 - - - - - 12.822 Support - System Test and Evaluation Cost Test and Evaluation Support - - 38.655 - - 3.816 - - 2.279 - - 2.253 - - - - - 2.253 Subtotal: Support - System Test and Evaluation Cost - - 38.655 - - 3.816 - - 2.279 - - 2.253 - - - - - 2.253 - - 11.890 48 11.345 25 3.106 25 2.883 - - - 25 2.883 - - 11.890 - 11.345 - 3.106 - 2.883 - - - - 2.883 1,000 334.102 178 84.667 269 104.059 - - - 269 104.059 Support - Training Cost Equipment Subtotal: Support - Training Cost Gross/Weapon System Cost 302.477 5,549 1,678.446 236.354 334.102 124.240 475.657 115.320 386.836 115.320 386.836 Remarks: Training equipment costs include the procurement of 25 CATMs and CATM shipping containers. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total 1,000 178 269 - 269 334.102 84.667 104.059 - 104.059 1,000 178 269 - 269 334.102 84.667 104.059 - 104.059 indicates the presence of a P-5a LI 2605C70302 - Joint Air-to-Ground MSLS (JAGM) Army UNCLASSIFIED Page 4 of 10 P-1 Line #9 Volume 1 - 109 === page 140 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 20 FY Contractor and Location Method/Type or Funding Vehicle (†) 2022 Lockheed Martin / Orlando SS / FPIF Redstone Arsenal, AL (†) 2023 Lockheed Martin / Orlando SS / FPIF Redstone Arsenal, AL Jul 2023 (†) 2024 Lockheed Martin / Orlando SS / FPIF Redstone Arsenal, AL Mar 2024 (†) 2025 Lockheed Martin / Orlando SS / FPIF Redstone Arsenal, AL (†) 2026 Lockheed Martin / Orlando SS / FFP (†) 2027 Lockheed Martin / Orlando SS / FFP Cost Elements All Up Rounds (AUR) All Up Rounds (AUR) All Up Rounds (AUR) All Up Rounds (AUR) All Up Rounds (AUR) All Up Rounds (AUR) (†) O O C P-1 Line Item Number / Title: 2605C70302 / Joint Air-to-Ground MSLS (JAGM) Item Number / Title [DODIC]: C70302 / Joint Air-to-Ground MSLS (JAGM) Location of PCO Award Date Date of First Delivery Mar 2023 Dec 2024 Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($ K) RFP Issue Date 490 260.993 Y Sep 2020 Dec 2025 629 260.301 Y Sep 2020 Dec 2026 1,117 269.085 Y Sep 2020 Aug 2025 Sep 2027 1,000 286.584 Y Sep 2020 Redstone Arsenal, AL Aug 2026 Sep 2028 178 249.506 Y Aug 2025 Redstone Arsenal, AL Aug 2027 Sep 2029 269 241.546 Y Oct 2025 indicates the presence of a P-21 Remarks: C / FPIF: Competitive / Fixed Price Incentive Fee SS / FPIF: Sole Source / Fixed Price Incentive Fee LI 2605C70302 - Joint Air-to-Ground MSLS (JAGM) Army UNCLASSIFIED Page 5 of 10 P-1 Line #9 Volume 1 - 110 === page 141 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2605C70302 / Joint Air-to-Ground MSLS (JAGM) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 20 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C70302 / Joint Air-to-Ground MSLS (JAGM) Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P All Up Rounds (AUR) Prior Years Deliveries: 3494 1 2022 ARMY 1 2022 NAVY 490 0 490 A - - - - - - - - - - - - - - - - - - - 490 152 0 152 A - - - - - - - - - - - - - - - - - - - 1 2022 152 Total 642 0 642 - - - - - - - - - - - - - - - - - - - 1 642 2023 ARMY 629 0 629 A - - - - - - - - - - - - - - - 629 1 2023 NAVY 295 0 295 A - - - - - - - - - - - - - - - 295 1 2023 Total 924 0 924 - - - - - - - - - - - - - - - 924 1 2024 ARMY 1,117 0 1,117 A - - - - - - - 1,117 1 2024 NAVY 1 2024 Total 1 2025 1 2025 FMS 1 2025 NAVY 1 2025 Total 1 2026 1 2026 FMS (‡) (‡) (‡) 260 0 260 A - - - - - - - 260 1,377 0 1,377 - - - - - - - 1,377 ARMY 1,000 0 1,000 1,000 (‡) 963 0 963 963 163 0 163 163 2,126 0 2,126 2,126 ARMY 178 0 178 178 (‡) 175 0 175 175 (‡) (‡) 1 2026 NAVY 257 0 257 257 1 2026 Total 610 0 610 610 1 2027 ARMY 269 0 269 269 1 2027 (‡) 172 0 172 172 265 0 265 265 706 0 706 FMS 1 2027 NAVY 1 2027 Total (‡) 706 O C T N O V D E C LI 2605C70302 - Joint Air-to-Ground MSLS (JAGM) Army J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #9 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 111 === page 142 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2605C70302 / Joint Air-to-Ground MSLS (JAGM) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 20 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C70302 / Joint Air-to-Ground MSLS (JAGM) Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N Calendar Year 2026 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P All Up Rounds (AUR) Prior Years Deliveries: 3494 1 2022 ARMY 1 2022 NAVY 490 0 490 - - 40 40 41 41 41 41 41 41 41 41 41 41 152 0 152 - - 12 12 12 12 13 13 13 13 13 13 13 13 1 2022 Total 642 0 642 - - 52 52 53 53 54 54 54 54 54 54 54 54 - - - - - - - - - - 1 0 2023 ARMY 629 0 629 - - - - - - - - - - - - - - 53 53 53 53 53 52 52 52 52 52 104 1 2023 NAVY 295 0 295 - - - - - - - - - - - - - - 24 24 24 24 24 25 25 25 25 25 50 1 2023 Total 924 0 924 - - - - - - - - - - - - - - 77 77 77 77 77 77 77 77 77 77 154 1 2024 ARMY 1,117 0 1,117 - - - - - - - - - - - - - - - - - - - - - - - - 1,117 1 2024 NAVY 260 0 260 - - - - - - - - - - - - - - - - - - - - - - - - 260 1 2024 Total 1,377 0 1,377 - - - - - - - - - - - - - - - - - - - - - - - - 1,377 1 2025 ARMY 1,000 0 1,000 A - - - - - - - - - - - - - - 1,000 1 2025 FMS (‡) 963 0 963 A - - - - - - - - - - - - - - 963 1 2025 NAVY 163 0 163 A - - - - - - - - - - - - - - 163 1 2025 Total 2,126 0 2,126 - - - - - - - - - - - - - - 2,126 1 2026 ARMY 178 0 178 A - - 178 1 2026 FMS (‡) 175 0 175 A - - 175 (‡) (‡) (‡) (‡) (‡) 0 0 1 2026 NAVY 257 0 257 A - - 257 1 2026 Total 610 0 610 - - 610 1 2027 ARMY 269 0 269 269 1 2027 (‡) 172 0 172 172 265 0 265 265 706 0 706 FMS 1 2027 NAVY 1 2027 Total (‡) 706 O C T N O V D E C LI 2605C70302 - Joint Air-to-Ground MSLS (JAGM) Army J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #9 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 112 === page 143 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2605C70302 / Joint Air-to-Ground MSLS (JAGM) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 20 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C70302 / Joint Air-to-Ground MSLS (JAGM) Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N Calendar Year 2028 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P All Up Rounds (AUR) Prior Years Deliveries: 3494 1 2022 ARMY 1 2022 NAVY 490 490 0 152 152 0 1 2022 Total 642 642 0 - - 1 2023 ARMY 629 525 104 52 52 1 2023 NAVY 295 245 50 25 25 1 2023 Total 924 770 154 77 77 - - - - - - - - - - - - 1 2024 ARMY 1,117 0 1,117 - - 94 93 93 93 93 93 93 93 93 93 93 93 1 2024 NAVY 260 0 260 - - 21 21 21 21 22 22 22 22 22 22 22 22 1 2024 Total 1,377 0 1,377 - - 115 114 114 114 115 115 115 115 115 115 115 115 - - - - - - - - - 1 2025 ARMY 1,000 0 1,000 - - - - - - - - - - - 83 83 83 83 83 83 83 83 84 84 84 84 0 1 2025 FMS (‡) 963 0 963 - - - - - - - - - - - 80 80 80 80 80 80 80 80 80 81 81 81 0 1 2025 NAVY 163 0 163 - - - - - - - - - - - 13 13 13 13 13 14 14 14 14 14 14 14 1 2025 Total 2,126 0 2,126 - - - - - - - - - - - 176 176 176 176 176 177 177 177 178 179 179 179 - 0 1 2026 ARMY 178 0 178 - - - - - - - - - - - - - - - - - - - - - - - 14 164 1 2026 FMS 175 0 175 - - - - - - - - - - - - - - - - - - - - - - - 14 161 (‡) (‡) (‡) (‡) (‡) (‡) 0 0 - - - - - - - - - - - - - - - - - - - - - - 0 0 0 - - - - - - - - - - 0 0 0 - 0 0 1 2026 NAVY 257 0 257 - - - - - - - - - - - - - - - - - - - - - - - 21 236 1 2026 Total 610 0 610 - - - - - - - - - - - - - - - - - - - - - - - 49 561 1 2027 ARMY 269 0 269 A - - - - - - - - - - - - - - 269 1 2027 (‡) 172 0 172 A - - - - - - - - - - - - - - 172 265 0 265 A - - - - - - - - - - - - - - 265 706 0 706 - - - - - - - - - - - - - - 706 FMS 1 2027 NAVY 1 2027 Total (‡) O C T N O V D E C LI 2605C70302 - Joint Air-to-Ground MSLS (JAGM) Army J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #9 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 113 === page 144 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2605C70302 / Joint Air-to-Ground MSLS (JAGM) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 20 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C70302 / Joint Air-to-Ground MSLS (JAGM) Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P All Up Rounds (AUR) Prior Years Deliveries: 3494 1 2022 ARMY 1 2022 NAVY 490 490 0 152 152 0 1 2022 Total 642 642 0 1 2023 ARMY 629 629 0 1 2023 NAVY 295 295 0 1 2023 Total 924 924 0 1 2024 ARMY 1,117 1,117 0 1 2024 NAVY 260 260 0 1 2024 Total 1,377 1,377 0 1 2025 ARMY 1,000 1,000 0 0 1 2025 FMS (‡) 963 963 0 0 1 2025 NAVY 163 163 0 1 2025 Total 2,126 2,126 0 - - - - - - - - - - - 1 2026 ARMY 178 14 164 14 15 15 15 15 15 15 15 15 15 15 0 1 2026 FMS (‡) 175 14 161 14 14 14 14 15 15 15 15 15 15 15 0 (‡) (‡) (‡) (‡) (‡) 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 - - - - - - - - - - - - - 0 1 2026 NAVY 257 21 236 21 21 21 21 21 21 22 22 22 22 22 1 2026 Total 610 49 561 49 50 50 50 51 51 52 52 52 52 52 - - - - - - - - - - - - 1 2027 ARMY 269 0 269 - - - - - - - - - - - 22 22 22 22 22 22 22 23 23 23 23 23 0 1 2027 (‡) 172 0 172 - - - - - - - - - - - 14 14 14 14 14 14 14 14 15 15 15 15 0 265 0 265 - - - - - - - - - - - 22 22 22 22 22 22 22 22 22 22 22 23 706 0 706 - - - - - - - - - - - 58 58 58 58 58 58 58 59 60 60 60 61 FMS 1 2027 NAVY 1 2027 Total (‡) O C T N O V D E C LI 2605C70302 - Joint Air-to-Ground MSLS (JAGM) Army J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 10 0 S E P O C T N O V D E C J A N F E B P-1 Line #9 M A R A P R M A Y J U N J U L A U G - 0 0 S E P Volume 1 - 114 0 === page 145 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2605C70302 / Joint Air-to-Ground MSLS (JAGM) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 20 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: C70302 / Joint Air-to-Ground MSLS (JAGM) Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 720 1,200 1,200 1 Lockheed Martin - Orlando ALT Prior to Oct 1 ALT After Oct 1 9 Reorder Manufacturing PLT 5 24 Total After Oct 1 ALT Prior to Oct 1 29 ALT After Oct 1 9 Manufacturing PLT 5 Total After Oct 1 24 29 Remarks: Production total quantities include AUR and CATM purchases for all customers. FMS production quantities shown on the P-21 are based on demand from four approved countries in pre-LOA development and are projections. A DCMA study conducted in FY 2022 established a MSR of 720. Sustained procurements below MSR contribute to increased unit costs and increased risk to the base of responsive vendors and suppliers. Production lead-time is 24 months from order window closure (always 30 September of the ordering FY). Delivery schedule reflects contract schedule. (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 2605C70302 - Joint Air-to-Ground MSLS (JAGM) Army UNCLASSIFIED Page 10 of 10 P-1 Line #9 Volume 1 - 115 === page 146 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 20: Air-To-Surface 2611C72100 / LONG-RANGE HYPERSONIC WEAPON Missile System Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 312.128 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 312.128 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 312.128 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - 500 2,000 2,000 - 4,500 2,136.797 2,479.848 2,034.414 - 10,094.055 669.178 347.845 - 301.777 - 669.178 - 347.845 - - - - 347.845 301.777 - 301.777 - 669.178 - 301.777 - 301.777 - - 301.777 1,812.068 - - 1,812.068 - 2,136.797 - - 2,479.848 - 1,812.068 To FY 2031 Complete - 2,034.414 - 2,136.797 - - 2,479.848 Total 10,094.055 - 2,034.414 - 10,094.055 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - 4,273.594 1,239.924 1,017.207 - 2,243.123 Description: The FY 2026 spend plan amount for Long-Range Hypersonic Weapon includes $347,845 thousand of discretionary and $113,932 thousand of mandatory for a total of $461,777 thousand. The FY27 funding of $301.777M supports the fielding of critical enabling technologies and capabilities that address near-term, and mid-term threats and is directly aligned to the Army Long Range Precision Fires modernization priority. Procurement and fielding of the LRHW to defeat Anti Access/Area Denial (A2/AD) capabilities, suppress adversary Long Range Fires, and engage other high payoff/time critical targets. The Army is working collaboratively with the Navy in the development of the LRHW. The LRHW system consists of the All-Up Rounds (AUR) plus Canister (AUR+C) which includes the Common Hypersonic Glide Body (CHGB) with the Navy 34.5-inch booster, the Battery Operations Center (BOC) for command and control (C2), and the Transporter Erector Launcher (TEL). An LRHW Battery contains a basic load of eight AUR+Cs plus a reload of eight, one BOC, four TELs, and other ground equipment including AUR emulators for soldier training purposes. Additionally, the LRHW will use a modified version of an existing C2 network, the Advanced Field Artillery Tactical Data System (AFATDS). The Army is procuring two Batteries of Ground Support Equipment (GSE) and GSE to stand up the Institutional Training Base (ITB) under a Middle Tier of Acquisition Rapid Fielding pathway. This funding line also includes procurement of tactical AUR+Cs and their associated Common Hypersonic Glide Bodies (CHGBs) as Government Furnished Equipment. An additional $113.932 million mandatory funding in FY 2026 accelerates the procurement of two AUR+C tactical rounds. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 - 669.178 669.178 LI 2611C72100 - LONG-RANGE HYPERSONIC WEAPON Army 347.845 347.845 FY 2027 OOC - 301.777 301.777 UNCLASSIFIED Page 1 of 11 FY 2027 Total - FY 2028 - FY 2029 - 301.777 1,812.068 - - 301.777 1,812.068 P-1 Line #11 FY 2030 FY 2031 500 2,000 2,000 2,136.797 2,479.848 2,034.414 500 2,000 2,000 2,136.797 2,479.848 2,034.414 Volume 1 - 116 === page 147 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 20: Air-To-Surface 2611C72100 / LONG-RANGE HYPERSONIC WEAPON Missile System Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 C72111 / LONG-RANGE HYPERSONIC WEAPON (LRHW) P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 312.128 - / 669.178 - / 347.845 - / 301.777 - / - - / 301.777 - / 312.128 - / 669.178 - / 347.845 - / 301.777 - / - - / 301.777 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 request for Long-Range Hypersonic Weapon is $301.777 million. The FY 2027 procurement dollars fund two AUR+Cs, Government Furnished Equipment (GFE), refurbishment of GSE test articles, GSE software maintenance, Interim Contractor Support (CLS cost element), Government Program Management, Engineering, and Logistics Support. The funding decrease from FY 2026 to FY 2027 is due to buying fewer AUR+Cs and no Emulators in FY 2027. LI 2611C72100 - LONG-RANGE HYPERSONIC WEAPON Army UNCLASSIFIED Page 2 of 11 P-1 Line #11 Volume 1 - 117 === page 148 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2611C72100 / LONG-RANGE HYPERSONIC WEAPON Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 20 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C72111 / LONG-RANGE HYPERSONIC WEAPON (LRHW) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) - 312.128 Less PY Advance Procurement ($ in Millions) 669.178 - Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) 301.777 - - - 347.845 301.777 - 301.777 - 669.178 FY 2027 Total - - 347.845 - 312.128 - - 669.178 - Total Obligation Authority ($ in Millions) FY 2027 OOC - 347.845 - 312.128 FY 2027 Base - 301.777 - 301.777 - - 301.777 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost LRHW Ground Support Equipment (GSE) Production & Integration 252,611.000 1 252.611 118,225.000 1 118.225 8 278.274 - - 105.621 - - 75.620 - - - - - 78.077 - - - 71.872 - - - - - 75.620 (†) All Up Round + Cannister (AUR + - - 1.652 Government Furnished Equipment - - 10.708 - - Other Recurring Production - - 5.894 - Subtotal: Recurring Cost - - 270.865 - - - 270.865 (†) C) Subtotal: Flyaway Cost 34,784.250 36,790.000 3 168.143 - - - 10.180 - - 574.822 - - - 574.822 110.370 39,038.500 2 39,038.500 2 78.077 74.436 - - 71.872 - 2.964 - - 6.191 - - - - - 6.191 - 293.391 - - 231.760 - - - - - 231.760 - - 293.391 - - 231.760 - - - - - 231.760 Support - Initial Spares and Repair Parts Cost Initial Spares and Repair Parts Subtotal: Support - Initial Spares and Repair Parts Cost - - - - - 8.123 - - 2.870 - - 10.857 - - - - - 10.857 - - - - - 8.123 - - 2.870 - - 10.857 - - - - - 10.857 - - - - - 29.571 - - 30.252 - - 32.616 - - - - - 32.616 Support - Logistics Cost Integrated Logistics Support LI 2611C72100 - LONG-RANGE HYPERSONIC WEAPON Army UNCLASSIFIED Page 3 of 11 P-1 Line #11 Volume 1 - 118 === page 149 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2611C72100 / LONG-RANGE HYPERSONIC WEAPON Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 20 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C72111 / LONG-RANGE HYPERSONIC WEAPON (LRHW) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) Subtotal: Support - Logistics Cost FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - - - - 29.571 - - 30.252 - - 32.616 - - - - - 32.616 - - 23.056 - - 43.240 - - 16.626 - - 18.000 - - - - - 18.000 - - 23.056 - - 43.240 - - 16.626 - - 18.000 - - - - - 18.000 Support - Program Management Cost Government Management Subtotal: Support - Program Management Cost Support - System Engineering Cost System Engineering - - 18.207 - - 13.422 - - 4.706 - - 8.544 - - - - - 8.544 Subtotal: Support - System Engineering Cost - - 18.207 - - 13.422 - - 4.706 - - 8.544 - - - - - 8.544 Gross/Weapon System Cost - - 312.128 - - 669.178 - - 347.845 - - 301.777 - - - - - 301.777 Remarks: The LRHW GSE Production and Integration cost element includes: one Battery 3 BOC and four Battery 3 TELs in FY 2025; refurbishment of GSE test articles, software maintenance, retrofit of Battery 1 to a Battery 2 configuration, and twelve emulators in FY 2026. FY 2027 funding is decreased compared to prior years, as it only covers the procurement of refurbishment of GSE test articles, software maintenance, system engineering and program management, training, contractor logistics support, and initial spares and repair parts. AUR+C cost element includes Missile Body, Canister, and Integration, Assembly, Test & Checkout (IAT&C) for eight AUR+Cs in FY 2025 and for three AUR+Cs in FY 2026. The increase in AUR+C unit cost in FY 2026 is due primarily to reduced quantity at low production rates. The decrease in FY 2027 AUR+C funding is due to the reduction of AUR+C procurements in fiscal year 2027. The increase in unit cost in FY27 is due to the integration of the first TI-24s onto the AUR+Cs, as well as inflation. FY 2025 GFE includes GSE GFE ($2.789 million) and GFE for eight TI-22 AUR+Cs ($165.354 million). FY 2026 GFE includes GFE for three TI-22M AUR+Cs ($74.436 million). FY 2027 GFE funding includes GFE for two TI-24 AUR+Cs ($71.872 million); funding supports hardware and non-hardware contractor costs applicable to GFE items (CHGB and TPS), such as Training, Data, Peculiar & Common Support Equipment, etc. Additional $113.932 million mandatory funding in FY26 accelerates the procurement of two AUR+C tactical rounds. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 2611C72100 - LONG-RANGE HYPERSONIC WEAPON Army FY 2025 FY 2027 Base FY 2026 669.178 669.178 UNCLASSIFIED Page 4 of 11 FY 2027 OOC 347.845 301.777 347.845 301.777 P-1 Line #11 FY 2027 Total - 301.777 301.777 Volume 1 - 119 === page 150 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 20 P-1 Line Item Number / Title: 2611C72100 / LONG-RANGE HYPERSONIC WEAPON ID Code (A=Service Ready, B=Not Service Ready) : (†) Item Number / Title [DODIC]: C72111 / LONG-RANGE HYPERSONIC WEAPON (LRHW) MDAP/MAIS Code: indicates the presence of a P-5a LI 2611C72100 - LONG-RANGE HYPERSONIC WEAPON Army UNCLASSIFIED Page 5 of 11 P-1 Line #11 Volume 1 - 120 === page 151 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 20 O O C Cost Elements LRHW Ground Support Equipment (†) (GSE) Production & Integration LRHW Ground Support Equipment (†) (GSE) Production & Integration All Up Round + Cannister (AUR + C) (†) All Up Round + Cannister (AUR + C) (†) All Up Round + Cannister (AUR + C) (†) (†) P-1 Line Item Number / Title: 2611C72100 / LONG-RANGE HYPERSONIC WEAPON FY Contractor and Location Method/Type or Funding Vehicle 2023 Lockheed Martin / Huntsville, AL SS / CPFF Army Contracting Command RSA Feb 2023 Jun 2026 1 209,150.000 Y Dec 2022 2025 Lockheed Martin / Huntsville, AL SS / CPFF Army Contracting Command RSA May 2025 Sep 2027 1 118,225.000 Y Dec 2022 2025 Lockheed Martin / Denver, CO SS / Various Navy Strategic Systems Programs Washington DC Jul 2025 Mar 2028 8 34,784.250 Y Mar 2023 2026 Lockheed Martin / Denver, CO SS / Various Navy Strategic Systems Programs Washington DC Apr 2026 Dec 2028 3 36,790.000 Y Mar 2023 2027 Lockheed Martin / Denver, CO SS / Various Navy Strategic Systems Programs Washington DC Apr 2027 Dec 2029 2 39,038.500 Y Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: C72111 / LONG-RANGE HYPERSONIC WEAPON (LRHW) Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date indicates the presence of a P-21 Remarks: Notes: The dates of first delivery for the GSE contracts are the planned DD250 dates for Battery 2 and Battery 3 GSE. GSE quantities are captured at the Battery level, and no tactical batteries are being ordered in FY 2024. The increase in AUR+C unit cost in FY 2026 is due primarily to reduced quantity at low production rates. LI 2611C72100 - LONG-RANGE HYPERSONIC WEAPON Army UNCLASSIFIED Page 6 of 11 P-1 Line #11 Volume 1 - 121 === page 152 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2611C72100 / LONG-RANGE HYPERSONIC WEAPON Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 20 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C72111 / LONG-RANGE HYPERSONIC WEAPON (LRHW) Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LRHW Ground Support Equipment (GSE) Production & Integration 1 2023 ARMY 1 0 1 1 2025 ARMY 1 0 1 A - - - - - - - - - - - - - - - - - - - - 1 1 All Up Round + Cannister (AUR + C) 2 2025 ARMY 8 0 8 8 2 2026 ARMY 3 0 3 3 2 2027 ARMY 2 0 2 2 O C T N O V D E C J A N LI 2611C72100 - LONG-RANGE HYPERSONIC WEAPON Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #11 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 122 === page 153 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2611C72100 / LONG-RANGE HYPERSONIC WEAPON Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 20 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C72111 / LONG-RANGE HYPERSONIC WEAPON (LRHW) Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LRHW Ground Support Equipment (GSE) Production & Integration 1 2023 ARMY 1 0 1 1 2025 ARMY 1 0 1 - - - - - - - - - - - - - - - - - - - - A - - - - - - - - - - - - - - 1 - - - 0 1 A - - - - - - - - - - - - - - - 8 A - - - - - - 3 All Up Round + Cannister (AUR + C) 2 2025 ARMY 8 0 8 2 2026 ARMY 3 0 3 2 2027 ARMY 2 0 2 2 O C T N O V D E C J A N LI 2611C72100 - LONG-RANGE HYPERSONIC WEAPON Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #11 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 123 === page 154 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2611C72100 / LONG-RANGE HYPERSONIC WEAPON Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 20 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C72111 / LONG-RANGE HYPERSONIC WEAPON (LRHW) Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LRHW Ground Support Equipment (GSE) Production & Integration 1 2023 ARMY 1 1 0 1 2025 ARMY 1 0 1 - - - - - - - - - - - 0 1 0 All Up Round + Cannister (AUR + C) 2 2025 ARMY 8 0 8 - - - - - - - - - - - - - - - - - - - 2 2026 ARMY 3 0 3 - - - - - - - - - - - - - - - - - - - - - - - - 3 2 2027 ARMY 2 0 2 A - - - - - - - - - - - - - - - - - - 2 O C T N O V D E C J A N LI 2611C72100 - LONG-RANGE HYPERSONIC WEAPON Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #11 1 M A R 1 A P R M A Y J U N 1 J U L 1 A U G 1 S E P Volume 1 - 124 3 === page 155 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2611C72100 / LONG-RANGE HYPERSONIC WEAPON Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 20 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C72111 / LONG-RANGE HYPERSONIC WEAPON (LRHW) Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E LRHW Ground Support Equipment (GSE) Production & Integration 1 2023 ARMY 1 1 0 0 1 2025 ARMY 1 1 0 0 All Up Round + Cannister (AUR + C) 2 2025 ARMY 8 5 3 2 2026 ARMY 3 0 3 - 1 - 2 2027 ARMY 2 0 2 - - O C T 1 N O V 1 0 1 - D E C 1 J A N LI 2611C72100 - LONG-RANGE HYPERSONIC WEAPON Army 1 F E B 0 M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 11 S E P O C T N O V 1 D E C J A N 1 F E B P-1 Line #11 0 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 125 === page 156 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2611C72100 / LONG-RANGE HYPERSONIC WEAPON Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 20 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: C72111 / LONG-RANGE HYPERSONIC WEAPON (LRHW) Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Lockheed Martin - Huntsville, AL 1 1 1 0 5 28 33 0 1 28 29 2 Lockheed Martin - Denver, CO 12 12 12 0 1 32 33 0 6 32 38 Remarks: The GSE quantity is based on a full Battery of end items. This delivery schedule does not include AURs procured by the Navy or with Army RDTE or mandatory funding. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 2611C72100 - LONG-RANGE HYPERSONIC WEAPON Army UNCLASSIFIED Page 11 of 11 P-1 Line #11 Volume 1 - 126 === page 157 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 0648CC0007 / Javelin (AAWS-M) System Summary Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 30: Anti-Tank/ Assault Missile Sys ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0604611A Line Item MDAP/MAIS Code: 280 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 43,878 752 649 1,316 - 1,316 1,137 1,116 970 966 - 50,784 8,216.781 296.021 329.205 417.031 - 417.031 395.485 380.190 339.518 343.554 - 10,717.785 100.622 8,116.159 100.622 8,216.781 - - 296.021 - 329.205 - - 296.021 - 417.031 - 329.205 - - 417.031 - 417.031 - - 417.031 - - 395.485 - 380.190 - - 339.518 - 395.485 To FY 2031 Complete 343.554 - 380.190 - 339.518 343.554 Total - 100.622 - 10,617.163 - 100.622 - 10,717.785 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 187.264 393.645 507.250 316.893 - 316.893 347.832 340.672 350.019 355.646 - 211.046 Description: The Javelin Advanced Anti-Tank Weapon System-Medium (AAWS-M) is a man-portable, fire-and-forget, medium-range missile with enhanced situational awareness and precision direct-fire effects to defeat armored vehicles and soft targets in a range of military operations. Javelin has a high kill rate against a variety of targets at extended ranges under day/night, battlefield obscurants, adverse weather and multiple counter-measure conditions. The system's soft launch feature permits firing from a fighting position or an enclosure. Javelin uses a modular design to allow the system to evolve to meet changing threats and requirements via both software and hardware upgrades. The system consists of a reusable Command Launch Unit (CLU) with a built-in-test (BIT), and a modular missile encased in a disposable launch tube assembly. The system also includes training devices for tactical training and classroom training. Javelin's fire-and-forget technology allows the gunner to fire and immediately take cover, to move to another fighting position, or to reload. The Javelin provides enhanced lethality through the use of a tandem multi-purpose warhead which will defeat all known armor threats. It is effective against both stationary and moving targets. This system also provides defensive capability against attacking/hovering helicopters. The CLU can also be used as a stand-alone surveillance and target acquisition asset. Javelin can be adapted for use on a variety of mounted platforms and remote weapon stations using the Javelin Vehicle Platform Adapter Kit (JVPAK). The Javelin weapon system is an Army-led, Acquisition Category (ACAT) IC Major Defense Acquisition Program (MDAP) that has joint interest with United States forces and international partners. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution FY 2025 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 752 649 1,316 - 1,316 1,137 1,116 970 966 296.021 329.205 417.031 - 417.031 395.485 380.190 339.518 343.554 Quantity Total Obligation Authority FY 2026 752 649 1,316 - 1,316 1,137 1,116 970 966 296.021 329.205 417.031 - 417.031 395.485 380.190 339.518 343.554 LI 0648CC0007 - Javelin (AAWS-M) System Summary Army UNCLASSIFIED Page 1 of 23 P-1 Line #12 Volume 1 - 127 === page 158 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 30: Anti-Tank/ Assault Missile Sys ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0648CC0007 / Javelin (AAWS-M) System Summary Program Elements for Code B Items: N/A Other Related Program Elements: 0604611A Line Item MDAP/MAIS Code: 280 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 H06102 / JAVELIN (AAWS-M) P-5a, P-21 43,484 / 7,882.261 300 / 133.866 - / 130.066 645 / 215.011 - / - P-5 H06103 / Javelin Lightweight Command Launch Unit (CLU) P-5a, P-21 394 / 334.520 452 / 162.155 649 / 199.139 671 / 202.020 - / - 671 / 202.020 P-40 Total Gross/Weapon System Cost 43,878 / 8,216.781 752 / 296.021 649 / 329.205 1,316 / 417.031 - / - 1,316 / 417.031 645 / 215.011 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: H06102 FY 2027 Base procurement dollars in the amount of $215.011 million supports the procurement of 645 missiles and additional Battery Coolant Units (BCUs). H06103 FY 2027 Base procurement dollars in the amount of $202.020 million supports the procurement of 671 Lightweight Command Launch Units (LWCLU) and associated training devices. The Army intends to convert any price advantages created through contract negotiations, other services' procurements, and foreign military sales into increased Army procurement of Javelin missiles and LWCLUs, while investing in the improvement of system safety, reliability, affordability, producibility, and addressing obsolescence. The increase in funding from FY 2026 to FY 2027 is due to the increase in procurement quantities. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 0648CC0007 - Javelin (AAWS-M) System Summary Army UNCLASSIFIED Page 2 of 23 P-1 Line #12 Volume 1 - 128 === page 159 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0648CC0007 / Javelin (AAWS-M) System Summary Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: H06102 / JAVELIN (AAWS-M) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2026 43,484 300 7,882.261 133.866 Less PY Advance Procurement ($ in Millions) 100.622 Net Procurement (P-1) ($ in Millions) 645 215.011 - 215.011 - 215.011 - 133.866 FY 2027 Total - - 130.066 - 7,882.261 FY 2027 OOC 645 - 133.866 100.622 Total Obligation Authority ($ in Millions) 130.066 - 7,781.639 Plus CY Advance Procurement ($ in Millions) FY 2027 Base - - 130.066 - - 215.011 - 215.011 - - 215.011 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 181.268 - 446.220 - - - 333.350 - - 333.350 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost (†) 42,951 5,384.440 300 70.800 - - - 645 134.510 - - - 645 134.510 Recurring Engineering - - 220.701 - - 12.575 - - 12.827 - - 13.096 - - - - - 13.096 Obsolescence Mitigation - - 70.559 - - - - - 4.985 - - 5.090 - - - - - 5.090 Acceptance Testing - - 64.946 - - 1.771 - - 3.614 - - 3.686 - - - - - 3.686 1,073 127.079 - - - - - - - - - - - - - - - - 5,867.725 - - 85.146 - - 21.426 - - 156.382 - - - - - 156.382 Guidance Section Obsolescence Redesign - - 45.097 - - 20.814 - - 66.515 - - 22.675 - - - - - 22.675 Production Line Facilitization/ Maintenance - - 331.897 - - - - - - - - - - - - - - - Javelin Tactical Trainer (JTT) Production Facilitization - - 31.214 - - - - - - - - - - - - - - - ICS Javelin Tactical Trainer (JTT) - - - - - - - - 0.222 - - - - - - - - - Training Device Obsolescence Redesign - - 13.354 - - 9.837 - - 15.854 - - 10.113 - - - - - 10.113 All Up Round CLU Retrofits Subtotal: Recurring Cost 125.362 118.433 236.000 208.543 208.543 - Non Recurring Cost LI 0648CC0007 - Javelin (AAWS-M) System Summary Army UNCLASSIFIED Page 3 of 23 P-1 Line #12 Volume 1 - 129 === page 160 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0648CC0007 / Javelin (AAWS-M) System Summary Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: H06102 / JAVELIN (AAWS-M) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) Subtotal: Non Recurring Cost FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - 421.562 - - 30.651 - - 82.591 - - 32.788 - - - - - 32.788 - - 6,289.287 - - 115.797 - - 104.017 - - 189.170 - - - - - 189.170 Battery Coolant Units (BCUs) - - 3.948 - - - - - 7.333 - - 6.746 - - - - - 6.746 Subtotal: Non Recurring Cost - - 3.948 - - - - - 7.333 - - 6.746 - - - - - 6.746 - - 3.948 - - - - - 7.333 - - 6.746 - - - - - 6.746 Production Engineering - - 163.334 - - 9.475 - - 9.664 - - 9.857 - - - - - 9.857 Subtotal: Support Production Engineering Cost - - 163.334 - - 9.475 - - 9.664 - - 9.857 - - - - - 9.857 - - 1,425.692 - - 8.594 - - 9.052 - - 9.238 - - - - - 9.238 - - 1,425.692 - - 8.594 - - 9.052 - - 9.238 - - - - - 9.238 43,484 7,882.261 300 133.866 - - 130.066 645 215.011 - - - 645 215.011 Subtotal: Flyaway Cost Hardware Cost Non Recurring Cost Subtotal: Hardware Cost Support - Production Engineering Cost Support - Program Management Cost Government Management Subtotal: Support - Program Management Cost Gross/Weapon System Cost 181.268 446.220 333.350 333.350 Remarks: The FY 2025 All Up Round unit cost is based on receipt of $70.800 million of Indo-Pacific (IND4) supplemental funding for replenishment of 300 missiles. Actual unit cost will be updated following award. The cost increase of the recurring cost element for All Up Round from FY 2026 to FY 2027 is due to no FY 2026 missile procurement contract award to reduce production backlog. The cost decrease of the non-recurring cost element for Guidance Section Obsolescence Redesign from FY 2026 to FY 2027 is due to a contract strategy change to leverage Other Government Agencies in the guidance section redesign effort. The cost decrease of the non-recurring cost element for Interim Contractor Support (ICS) Javelin Tactical Trainer (JTT) from FY 2026 to FY 2027 is due to a delay in the JTT fielding. The cost decrease of the non-recurring cost element for Training Device Obsolescence Redesign from FY 2026 to FY 2027 is due to completing redesign of the JTT in FY 2027. Secondary Distribution Army Quantity Total Obligation Authority LI 0648CC0007 - Javelin (AAWS-M) System Summary Army FY 2025 FY 2027 Base FY 2026 300 133.866 UNCLASSIFIED Page 4 of 23 FY 2027 OOC 130.066 FY 2027 Total 645 - 645 215.011 - 215.011 P-1 Line #12 Volume 1 - 130 === page 161 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 P-1 Line Item Number / Title: 0648CC0007 / Javelin (AAWS-M) System Summary ID Code (A=Service Ready, B=Not Service Ready) : Secondary Distribution Total: Secondary Distribution (†) Quantity Total Obligation Authority Item Number / Title [DODIC]: H06102 / JAVELIN (AAWS-M) MDAP/MAIS Code: FY 2025 FY 2027 Base FY 2026 300 133.866 FY 2027 OOC 130.066 FY 2027 Total 645 - 645 215.011 - 215.011 indicates the presence of a P-5a LI 0648CC0007 - Javelin (AAWS-M) System Summary Army UNCLASSIFIED Page 5 of 23 P-1 Line #12 Volume 1 - 131 === page 162 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (†) All Up Round (†) All Up Round (†) All Up Round (†) All Up Round (†) All Up Round (†) O O C P-1 Line Item Number / Title: 0648CC0007 / Javelin (AAWS-M) System Summary Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: H06102 / JAVELIN (AAWS-M) Qty Specs Date Unit Cost Avail Revision Now? Available ($ K) RFP Issue Date FY Contractor and Location 2022 JJV All Up Round / Tucson AZ Orlando FL SS / FFP AMCOM, Redstone Arsenal, AL May 2022 Jan 2025 6,286 168.366 Y Oct 2019 2023 JJV All Up Round / Tucson AZ Orlando FL SS / FFP AMCOM, Redstone Arsenal, AL Apr 2023 Apr 2028 2,278 196.132 Y Oct 2019 2024 JJV All Up Round / Tucson AZ Orlando FL SS / FFP AMCOM, Redstone Arsenal, AL Apr 2024 Aug 2030 944 221.188 Y Jun 2022 2025 JJV All Up Round / Tucson AZ Orlando FL SS / FFP AMCOM, Redstone Arsenal, AL May 2026 Apr 2031 300 236.000 Y Nov 2025 2027 JJV All Up Round / Tucson AZ Orlando FL SS / FFP AMCOM, Redstone Arsenal, AL Apr 2027 Apr 2031 645 208.543 Y Nov 2025 (Each) indicates the presence of a P-21 Remarks: Extended delivery lead-times are due to increased quantities procured with Ukraine Supplemental funding in FY 2022 through FY 2024 excess to production capacity. Industrial base supplemental funds provided in FY 2022 and FY 2023 facilitize an increase in production capacity to meet increased demand and will reduce delivery lead-times starting in FY 2027. There is no FY 2026 P-5a entry due to 0 missiles being procured in FY 2026. This does not cause a gap in production due to production backlog from prior years. JJV: Javelin Joint Venture (includes Raytheon in Tucson, AZ and Lockheed Martin in Orlando, FL) SS: Sole Source FFP: Firm Fixed Price AMCOM: Aviation and Missile Command LI 0648CC0007 - Javelin (AAWS-M) System Summary Army UNCLASSIFIED Page 6 of 23 P-1 Line #12 Volume 1 - 132 === page 163 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0648CC0007 / Javelin (AAWS-M) System Summary Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE Item Number / Title [DODIC]: H06102 / JAVELIN (AAWS-M) Fiscal Year 2022 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P All Up Round Prior Years Deliveries: 33443 1 2022 ARMY 6,286 0 6,286 A - - - - - - - - - - - - - - - - - 1 2022 FMS (‡) 510 0 510 A - - - - - - - - - - - - - - - - - 510 1 2022 MC (‡) 1,005 0 1,005 A - - - - - - - - - - - - - - - - - 1,005 1 2022 NAVY 13 0 13 A - - - - - - - - - - - - - - - - - 13 1 2022 OTH 1 2022 Total 1 2023 1 2023 FMS 1 2023 (‡) (‡) 6,286 86 0 86 A - - - - - - - - - - - - - - - - - 86 7,900 0 7,900 - - - - - - - - - - - - - - - - - 7,900 ARMY 2,278 0 2,278 A - - - - - - 2,278 (‡) 1,512 0 1,512 A - - - - - - 1,512 (‡) 1,272 0 1,272 A - - - - - - 1,272 MC 1 2023 NAVY 1 2023 OTH 1 2023 1 2024 1 2024 FMS 1 2024 MC 1 2024 OTH 1 2024 Total 1 2025 1 2025 FMS 1 2025 MC 1 2025 OTH 1 2025 Total 1 2027 1 2027 FMS 1 2027 MC 1 2027 (‡) 5 0 5 A - - - - - - 5 80 0 80 A - - - - - - 80 Total 5,147 0 5,147 - - - - - - 5,147 ARMY 944 0 944 944 (‡) 2,936 0 2,936 2,936 (‡) 2,385 0 2,385 2,385 (‡) 300 0 300 300 6,565 0 6,565 6,565 ARMY 300 0 300 300 (‡) 587 0 587 587 (‡) 58 0 58 58 (‡) 50 0 50 50 995 0 995 995 ARMY 645 0 645 645 (‡) 3,190 0 3,190 3,190 (‡) 125 0 125 125 Total 3,960 0 3,960 3,960 (‡) O C T N O V D E C J A N LI 0648CC0007 - Javelin (AAWS-M) System Summary Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #12 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 133 === page 164 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0648CC0007 / Javelin (AAWS-M) System Summary Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE Item Number / Title [DODIC]: H06102 / JAVELIN (AAWS-M) Fiscal Year 2024 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P All Up Round Prior Years Deliveries: 33443 1 2022 ARMY 6,286 0 6,286 - - - - - - - - - - - - - - - 287 - 367 469 - - - - - 1 2022 FMS (‡) 510 0 510 - - 41 - - - - - - - - - - - - 204 - 158 56 - - - - - 51 1 2022 MC (‡) 1,005 0 1,005 - - - - - - - - - - - - - - - 1 - - - - - - - - 1,004 1 2022 NAVY 13 0 13 - - - - - - - - - - - - - - - 13 - - - - - - - - 0 1 2022 OTH 1 2022 Total 1 2023 1 2023 FMS 1 2023 (‡) (‡) 5,163 86 0 86 - - - - - - - - - - - - - - - - - - - - - - - - 86 7,900 0 7,900 - - 41 - - - - - - - - - - - - 505 - 525 525 - - - - - 6,304 ARMY 2,278 0 2,278 - - - - - - - - - - - - - - - - - - - - - - - - 2,278 (‡) 1,512 0 1,512 - - - - - - - - - - - - - - - - - - - - - - - - 1,512 (‡) 1,272 0 1,272 - - - - - - - - - - - - - - - - - - - - - - - - 1,272 MC 1 2023 NAVY 1 2023 OTH 1 2023 1 2024 1 2024 FMS 1 2024 MC 1 2024 OTH 1 2024 Total 1 2025 1 2025 FMS 1 2025 MC 1 2025 OTH 1 2025 Total 1 2027 1 2027 FMS 1 2027 MC 1 2027 (‡) 5 0 5 - - - - - - - - - - - - - - - - - - - - - - - - 5 80 0 80 - - - - - - - - - - - - - - - - - - - - - - - - 80 Total 5,147 0 5,147 - - - - - - - - - - - - - - - - - - - - - - - - 5,147 ARMY 944 0 944 A - - - - - - - - - - - - - - - - - - 944 (‡) 2,936 0 2,936 A - - - - - - - - - - - - - - - - - - 2,936 (‡) 2,385 0 2,385 A - - - - - - - - - - - - - - - - - - 2,385 (‡) 300 0 300 A - - - - - - - - - - - - - - - - - - 300 6,565 0 6,565 - - - - - - - - - - - - - - - - - - 6,565 ARMY 300 0 300 300 (‡) 587 0 587 587 (‡) 58 0 58 58 (‡) 50 0 50 50 995 0 995 995 ARMY 645 0 645 645 (‡) 3,190 0 3,190 3,190 (‡) 125 0 125 125 Total 3,960 0 3,960 3,960 (‡) O C T N O V D E C J A N LI 0648CC0007 - Javelin (AAWS-M) System Summary Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #12 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 134 === page 165 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0648CC0007 / Javelin (AAWS-M) System Summary Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: H06102 / JAVELIN (AAWS-M) Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P All Up Round Prior Years Deliveries: 33443 1 2022 ARMY 6,286 1,123 5,163 525 - - - 433 - - 525 - - 525 - - 525 - - - - 445 - - - 416 - 1,769 1 2022 FMS (‡) 510 459 51 - - - - 51 - - - - - - - - - - - - - - - - - - - 0 1 2022 MC (‡) 1,005 1 1,004 - - - - - - - - - - - - - - - - 422 - 106 - 471 - - 0 1 2022 13 13 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 NAVY (‡) (‡) 1 2022 OTH 1 2022 Total 1 2023 1 2023 FMS 1 2023 MC 1 2023 NAVY 5 86 0 86 - - - - - - - - - - - - - - - - - - - - - - - - 86 7,900 1,596 6,304 525 - - - 484 - - 525 - - 525 - - 525 - - 422 - 551 - 471 - 421 - 1,855 ARMY 2,278 0 2,278 - - - - - - - - - - - - - - - - - - - - - - - - 2,278 (‡) 1,512 0 1,512 - - - - - - - - - - - - - - - - 269 - 124 - 229 - 220 - 670 (‡) 1,272 0 1,272 - - - - - - - - - - - - - - - - - - - - - - 54 - 1,218 - 5 (‡) 5 0 5 - - - - - - - - - - - - - - - - - - - - - - 0 80 0 80 - - - - - - - - - - - - - - - - 7 - 25 - - - - - 48 Total 5,147 0 5,147 - - - - - - - - - - - - - - - - 276 - 149 - 229 - 279 - 4,214 ARMY 944 0 944 - - - - - - - - - - - - - - - - - - - - - - - - 944 (‡) 2,936 0 2,936 - - - - - - - - - - - - - - - - - - - - - - - - 2,936 (‡) 2,385 0 2,385 - - - - - - - - - - - - - - - - - - - - - - - - 2,385 (‡) 300 0 300 - - - - - - - - - - - - - - - - - - - - - - - - 300 6,565 0 6,565 - - - - - - - - - - - - - - - - - - - - - - - - 6,565 ARMY 300 0 300 A - - - - - - - - - - - - - - - - - 300 (‡) 587 0 587 A - - - - - - - - - - - - - - - - - 587 (‡) 58 0 58 A - - - - - - - - - - - - - - - - - 58 (‡) 50 0 50 A - - - - - - - - - - - - - - - - - 50 995 0 995 - - - - - - - - - - - - - - - - - 995 ARMY 645 0 645 A - - - - - - 645 (‡) 3,190 0 3,190 A - - - - - - 3,190 (‡) 125 0 125 A - - - - - - 125 Total 3,960 0 3,960 - - - - - - 3,960 1 2023 OTH 1 2023 1 2024 1 2024 FMS 1 2024 MC 1 2024 OTH 1 2024 Total 1 2025 1 2025 FMS 1 2025 MC 1 2025 OTH 1 2025 Total 1 2027 1 2027 FMS 1 2027 MC 1 2027 (‡) O C T N O V D E C J A N LI 0648CC0007 - Javelin (AAWS-M) System Summary Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #12 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 135 === page 166 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0648CC0007 / Javelin (AAWS-M) System Summary Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: H06102 / JAVELIN (AAWS-M) Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P All Up Round Prior Years Deliveries: 33443 1 2022 ARMY 6,286 4,517 1,769 430 - 511 - 489 - 339 - - - - 0 1 2022 FMS (‡) 510 510 0 - - - - - - - - - - - 0 1 2022 MC (‡) 1,005 1,005 0 - - - - - - - - - - - 0 1 2022 13 13 0 - - - - - - - - - - - 0 NAVY (‡) (‡) 1 2022 OTH 86 0 86 - - - - - - - - - - 86 1 2022 Total 7,900 6,045 1,855 430 - 511 - 489 - 339 - - - 86 - - - - - - - - - - - - - 0 1 2023 ARMY 2,278 0 2,278 - - - - - - 361 - 581 - 95 - 81 - 179 - 81 - 254 - 227 - 419 - 0 1 2023 FMS (‡) 1,512 842 670 270 - 189 - 211 - - - - - - - - - - - - - - - - - - - 0 1 2023 (‡) 1,272 54 1,218 - - - - - - - - - - 200 - 200 - 200 - 200 - 200 - 218 - - - 0 MC 1 2023 NAVY 1 2023 OTH 1 2023 1 2024 1 2024 FMS (‡) 0 5 5 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 80 32 48 - - - - - - - - - - - - - - - - - - - - - - - - 48 Total 5,147 933 4,214 270 - 189 - 211 - 361 - 581 - 295 - 281 - 379 - 281 - 454 - 445 - 419 - 48 ARMY 944 0 944 - - - - - - - - - - - - - - - - - - - - - - - - 944 (‡) (‡) 2,936 0 2,936 - - - - - - - - - - 204 - 304 - 206 - 304 - 206 - 204 - 240 - 1,268 (‡) 2,385 0 2,385 - - - - - - - - - - - - - - - - - - - - - - - - 2,385 (‡) 300 0 300 - - - - - - - - - - 75 - 75 - 75 - 75 - - - - - - - 0 6,565 0 6,565 - - - - - - - - - - 279 - 379 - 281 - 379 - 206 - 204 - 240 - 4,597 1 2024 MC 1 2024 OTH 1 2024 Total 1 2025 ARMY 300 0 300 - - - - - - - - - - - - - - - - - - - - - - - - 300 1 2025 FMS (‡) 587 0 587 - - - - - - - - - - - - - - - - - - - - - - - - 587 1 2025 MC (‡) 58 0 58 - - - - - - - - - - - - - - - - - - - - - - - - 58 1 2025 OTH (‡) 50 0 50 - - - - - - - - - - - - - - - - - - - - - - - - 50 1 2025 Total 995 0 995 - - - - - - - - - - - - - - - - - - - - - - - - 995 1 2027 ARMY 645 0 645 - - - - - - - - - - - - - - - - - - - - - - - - 645 1 2027 FMS (‡) 3,190 0 3,190 - - - - - - - - - - - - - - - - - - - - - - - - 3,190 1 2027 MC (‡) 125 0 125 - - - - - - - - - - - - - - - - - - - - - - - - 125 1 2027 Total 3,960 0 3,960 - - - - - - - - - - - - - - - - - - - - - - - - 3,960 O C T N O V D E C J A N LI 0648CC0007 - Javelin (AAWS-M) System Summary Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #12 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 136 === page 167 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0648CC0007 / Javelin (AAWS-M) System Summary Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: H06102 / JAVELIN (AAWS-M) Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2031 M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P All Up Round Prior Years Deliveries: 33443 1 2022 ARMY 6,286 6,286 0 0 1 2022 FMS (‡) 510 510 0 0 1 2022 MC (‡) 1,005 1,005 0 0 1 2022 13 13 0 0 NAVY (‡) (‡) 1 2022 OTH 86 86 0 1 2022 Total 7,900 7,900 0 - - - - - 1 2023 ARMY 2,278 2,278 0 - - - - - 0 1 2023 FMS (‡) 1,512 1,512 0 - - - - - 0 1 2023 (‡) 1,272 1,272 0 - - - - - 0 0 MC 1 2023 NAVY 1 2023 OTH 1 2023 1 1 (‡) 0 - - - - - - - - - - - - - - - - - - - 0 5 5 0 - - - - - 80 32 48 - - - - 48 Total 5,147 5,099 48 - - - - 48 - - - - - - - - - - - - 2024 ARMY 944 0 944 - - - - - - - - - - 489 - 455 - - - - 0 2024 FMS (‡) 2,936 1,668 1,268 375 - 633 - 122 - 138 - - - - - - - - - - 0 (‡) 2,385 0 2,385 - - - - 440 - 445 - 468 - 113 - 205 - 660 - 54 0 (‡) 300 300 0 - - - - - - - - - - - - - - - - - (‡) 0 - - - - - - - 0 1 2024 MC 1 2024 OTH 1 2024 Total 6,565 1,968 4,597 375 - 633 - 562 - 583 - 468 - 602 - 660 - 660 - 54 - - 1 2025 ARMY 300 0 300 - - - - - - - - - - - - - - - - - - 300 0 1 2025 FMS (‡) 587 0 587 - - - - - - - - - - - - - - - - 587 - - 0 1 2025 MC (‡) 58 0 58 - - - - - - - - - - 58 - - - - - - - - 0 1 2025 OTH (‡) 50 0 50 - - - - 50 - - - - - - - - - - - - - - 1 2025 Total 995 0 995 - - - - 50 - - - - - 58 - - - - - 587 - 300 - - - - - 1 2027 ARMY 645 0 645 - - - - - - - - - - - - - - - - - - 358 - 287 - - - 0 1 2027 FMS (‡) 3,190 0 3,190 - - - - - - - - - - - - - - - - - - - - 250 - 660 - 2,280 1 2027 MC (‡) 125 0 125 - - - - - - - - - - - - - - - - - - 2 - 123 - - - 0 1 2027 Total 3,960 0 3,960 - - - - - - - - - - - - - - - - - - 360 - 660 - 660 - 2,280 O C T N O V D E C J A N LI 0648CC0007 - Javelin (AAWS-M) System Summary Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #12 0 M A R A P R - - - - - 0 0 M A Y J U N J U L A U G 0 S E P Volume 1 - 137 === page 168 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0648CC0007 / Javelin (AAWS-M) System Summary Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: H06102 / JAVELIN (AAWS-M) Fiscal Year 2032 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2031 1 OCT Calendar Year 2032 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2033 M A Y J U N J U L Calendar Year 2033 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P All Up Round Prior Years Deliveries: 33443 1 2022 ARMY 6,286 6,286 0 0 1 2022 FMS (‡) 510 510 0 0 1 2022 MC (‡) 1,005 1,005 0 0 1 2022 13 13 0 0 NAVY (‡) (‡) 1 2022 OTH 86 86 0 1 2022 Total 7,900 7,900 0 1 2023 ARMY 2,278 2,278 0 0 1 2023 FMS (‡) 1,512 1,512 0 0 1 2023 (‡) 1,272 1,272 0 0 0 MC 1 2023 NAVY 1 2023 OTH 1 2023 1 1 (‡) 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 5 5 0 80 80 0 Total 5,147 5,147 0 2024 ARMY 944 944 0 0 2024 FMS (‡) 2,936 2,936 0 0 (‡) 2,385 2,385 0 0 (‡) 300 300 0 (‡) 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 1 2024 MC 1 2024 OTH 1 2024 Total 6,565 6,565 0 1 2025 ARMY 300 300 0 0 1 2025 FMS (‡) 587 587 0 0 1 2025 MC (‡) 58 58 0 0 1 2025 OTH (‡) 50 50 0 1 2025 Total 995 995 0 - - - - - - - 1 2027 ARMY 645 645 0 - - - - - - - 0 1 2027 FMS (‡) 3,190 910 2,280 660 - 660 - 660 - 300 0 1 2027 MC (‡) 125 125 0 - - - - - - - 1 2027 Total 3,960 1,680 2,280 660 - 660 - 660 - 300 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 O C T N O V D E C J A N LI 0648CC0007 - Javelin (AAWS-M) System Summary Army F E B M A R A P R - - - - - - - - - - - - - - - - - 0 0 M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #12 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 138 0 === page 169 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0648CC0007 / Javelin (AAWS-M) System Summary Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: H06102 / JAVELIN (AAWS-M) Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 JJV All Up Round - Tucson AZ Orlando FL MSR For 2027 1-8-5 For 2027 MAX For 2027 1,680 3,960 3,960 ALT Prior to Oct 1 ALT After Oct 1 4 Reorder Manufacturing PLT 6 Total After Oct 1 48 ALT Prior to Oct 1 54 ALT After Oct 1 4 Manufacturing PLT 6 Total After Oct 1 48 54 Remarks: A DCMA study conducted in FY 2022 assessed the missile MSR of 1,680; will need to be reassessed in FY 2028. FY 2022 FMS missile qty of 41 were the result of an approved diversion. There was no break in production. FY 2022, FY 2023, and FY 2024 production lead times are based on contracted delivery dates. The vendor has accelerated their production deliveries on the current contract and is projected to carry forward into future contracts. There is no FY 2026 P-21 entry due to 0 missiles being procured in FY 2026. This does not cause a gap in production due to production backlog from prior years. Ukraine supplemental funding Tranches 1, 4, 5, 8, 10, 13 and 15 procures additional Army missiles as follows: - Tranche 1: 1,534 missiles on the FY 2022 contract with deliveries 2nd qtr FY 2025 through 1st qtr FY 2026 - Tranche 1: 1,866 missiles on the FY 2023 contract with deliveries 2nd qtr FY 2026 through 1st qtr FY 2027 - Tranche 4: 142 missiles on the FY 2023 contract with delivery 2nd qtr FY 2026 - Tranche 4: 958 missiles on the FY 2023 delivery order with deliveries 3rd qtr FY 2027 through 1st qtr FY 2028 - Tranche 5: 836 missiles on the FY 2023 delivery order with deliveries 3rd qtr FY 2027 through 1st qtr FY 2028 - Tranche 8: 836 missiles on the FY 2023 delivery order with deliveries 1st qtr FY 2028 through 3rd qtr FY 2028 - Tranche 10: 942 missiles on the FY 2023 delivery order with deliveries 3rd qtr FY 2028 through 4th qtr FY 2028 - Tranche 10: 39 missiles on the FY 2024 delivery order with deliveries in 4th qtr FY 2028 - Tranche 13: 527 missiles on the FY 2024 delivery order with deliveries 4th qtr FY 2028 through 3rd qtr FY 2029 - Tranche 15: 750 missiles on the FY 2025 delivery order with deliveries 3rd qtr FY 2029 through 4th qtr FY 2029 Ukraine (UKRR) supplemental funding procures additional Army missiles as follows: - FY 2024: 944 missiles on FY 2025 delivery order Indo-Pacific (IND4) supplemental funding procures additional Army missiles as follows: - FY 2025: 300 missiles on FY 2025 delivery order (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0648CC0007 - Javelin (AAWS-M) System Summary Army UNCLASSIFIED Page 13 of 23 P-1 Line #12 Volume 1 - 139 === page 170 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0648CC0007 / Javelin (AAWS-M) System Summary Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: H06103 / Javelin Lightweight Command Launch Unit (CLU) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) FY 2025 FY 2026 671 - 671 334.520 162.155 199.139 202.020 - 202.020 - - 162.155 - Total Obligation Authority ($ in Millions) FY 2027 Total 649 334.520 Plus CY Advance Procurement ($ in Millions) FY 2027 OOC 452 - Net Procurement (P-1) ($ in Millions) FY 2027 Base 394 - 334.520 - 199.139 - 162.155 - 202.020 - 199.139 - - 202.020 - 202.020 - - 202.020 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 849.036 - 358.750 - 306.840 - 301.073 - - 301.073 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost Light Weight CLU (†) Production 210.099 890 186.988 203.440 452 91.955 208.488 649 135.309 212.867 671 142.834 - - - 212.867 671 142.834 5.165 Recurring Engineering - - 11.666 - - 4.683 - - 4.777 - - 5.165 - - - - - Acceptance Testing - - 1.710 - - 1.125 - - 1.147 - - - - - - - - - Fielding - - 3.576 - - 2.252 - - 2.297 - - 2.636 - - - - - 2.636 - - 203.940 - - 100.015 - - 143.530 - - 150.635 - - - - - 150.635 Production Line Facilitization/ Maintenance - - 80.640 - - 7.858 - - - - - - - - - - - - BST Production Facilitization - - 3.850 - - - - - - - - - - - - - - - Command Launch Unit Refurbishment - - 2.184 - - - - - - - - - - - - - - - Depot Facilitization - - - - - 10.927 - - 9.918 - - 11.038 - - - - - 11.038 Interim Contractor Support - - - - - 0.950 - - 2.164 - - 3.629 - - - - - 3.629 Training Device Obsolescence Redesign - - - - - 15.091 - - 15.688 - - 1.203 - - - - - 1.203 Subtotal: Non Recurring Cost - - 86.674 - - 34.826 - - 27.770 - - 15.870 - - - - - 15.870 Subtotal: Recurring Cost Non Recurring Cost LI 0648CC0007 - Javelin (AAWS-M) System Summary Army UNCLASSIFIED Page 14 of 23 P-1 Line #12 Volume 1 - 140 === page 171 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0648CC0007 / Javelin (AAWS-M) System Summary Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: H06103 / Javelin Lightweight Command Launch Unit (CLU) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) Qty (Each) Unit Cost ($ M) - - 290.614 - - Battery Coolant Units (BCUs) - - 0.262 - - Subtotal: Non Recurring Cost - - 0.262 - - - 0.262 - - - Production Engineering Subtotal: Support Production Engineering Cost Subtotal: Flyaway Cost FY 2026 Total Cost ($ K) 134.841 FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) - - - - - - - - - - - 8.126 - - - 8.126 - - - 14.330 - - 14.330 - - - ($ K) 171.300 FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) - - - - - - - - - - - 9.237 - - - 9.237 - - - 6.316 - - 6.316 12.654 - - - 12.654 - - - 8.534 - - 8.534 394 334.520 ($ K) 166.505 FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - - - - 166.505 - - - - - - - - - - - - - - - - - - - - - - - - 10.348 - - 3.032 - - - - - 3.032 - 10.348 - - 3.032 - - - - - 3.032 - - 6.443 - - 6.864 - - - - - 6.864 - - 6.443 - - 6.864 - - - - - 6.864 5.826 - - 5.954 - - 6.358 - - - - - 6.358 - 5.826 - - 5.954 - - 6.358 - - - - - 6.358 - - 5.934 - - 5.094 - - 19.261 - - - - - 19.261 - - 5.934 - - 5.094 - - 19.261 - - - - - 19.261 452 162.155 649 199.139 671 202.020 - - - 671 202.020 Hardware Cost Non Recurring Cost Subtotal: Hardware Cost Support - Initial Spares and Repair Parts Cost Initial Spares and Repair Parts Subtotal: Support - Initial Spares and Repair Parts Cost Support - Production Engineering Cost Support - Program Management Cost Government Management Subtotal: Support - Program Management Cost Support - Training Cost Equipment Subtotal: Support - Training Cost Gross/Weapon System Cost 849.036 358.750 306.840 301.073 301.073 Remarks: The cost decrease to the recurring cost element for Acceptance Testing is due to completion of First Article Testing. The cost increase to the recurring cost element for Fielding and the non recurring cost element for Interim Contractor Support (ICS) is due to the increase in Lightweight Command Launch Unit (LWCLU) and LWCLU Basic Skills Trainer (BST) deliveries. The cost decrease to the non recurring cost element for Training Device Obsolescence Redesign is due to the transitioning from obsolescence redesign to obsolescence mitigation. LI 0648CC0007 - Javelin (AAWS-M) System Summary Army UNCLASSIFIED Page 15 of 23 P-1 Line #12 Volume 1 - 141 === page 172 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 P-1 Line Item Number / Title: 0648CC0007 / Javelin (AAWS-M) System Summary ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: H06103 / Javelin Lightweight Command Launch Unit (CLU) MDAP/MAIS Code: The cost increase to the Support cost element for Training Cost - Equipment is due to the increased procurement of training devices. The cost decrease to the Support cost element for Initial Spares and Repair Parts is due to the completion of depot initial spares procurement. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total 452 649 671 - 671 162.155 199.139 202.020 - 202.020 452 649 671 - 671 162.155 199.139 202.020 - 202.020 indicates the presence of a P-5a LI 0648CC0007 - Javelin (AAWS-M) System Summary Army UNCLASSIFIED Page 16 of 23 P-1 Line #12 Volume 1 - 142 === page 173 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 O O C Cost Elements (†) Light Weight CLU Production (†) Light Weight CLU Production (†) Light Weight CLU Production (†) Light Weight CLU Production (†) Light Weight CLU Production (†) Light Weight CLU Production (†) P-1 Line Item Number / Title: 0648CC0007 / Javelin (AAWS-M) System Summary Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: H06103 / Javelin Lightweight Command Launch Unit (CLU) Qty Specs Date Unit Cost Avail Revision Now? Available ($ K) RFP Issue Date FY Contractor and Location 2022 JJV Lightweight CLU / Tucson AZ Orlando FL SS / FFP AMCOM, Redstone Arsenal AL Jun 2022 Jun 2025 491 294.625 N Oct 2020 2023 JJV Lightweight CLU / Tucson AZ Orlando FL SS / FFP AMCOM, Redstone Arsenal AL Aug 2023 Nov 2026 157 199.051 N Oct 2020 2024 JJV Lightweight CLU / Tucson AZ Orlando FL SS / FFP AMCOM, Redstone Arsenal AL Jun 2024 Sep 2027 237 204.793 N Dec 2021 2025 JJV Lightweight CLU / Tucson AZ Orlando FL SS / FFP AMCOM, Redstone Arsenal AL Aug 2025 Jun 2028 452 203.440 N Dec 2021 2026 JJV Lightweight CLU / Tucson AZ Orlando FL SS / FFP AMCOM, Redstone Arsenal AL Aug 2026 Jun 2029 649 208.488 N Dec 2021 2027 JJV Lightweight CLU / Tucson AZ Orlando FL SS / FFP AMCOM, Redstone Arsenal AL Apr 2027 Jun 2030 671 212.867 N Nov 2025 (Each) indicates the presence of a P-21 Remarks: JJV: Javelin Joint Venture (includes Raytheon in Tucson, AZ and Lockheed Martin in Orlando, FL) SS: Sole Source FFP: Firm Fixed Price AMCOM: Aviation and Missile Command LI 0648CC0007 - Javelin (AAWS-M) System Summary Army UNCLASSIFIED Page 17 of 23 P-1 Line #12 Volume 1 - 143 === page 174 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0648CC0007 / Javelin (AAWS-M) System Summary Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: H06103 / Javelin Lightweight Command Launch Unit (CLU) Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Light Weight CLU Production Prior Years Deliveries: 5 1 2022 ARMY 491 0 491 - - 491 1 2023 ARMY 157 0 157 A - - 157 1 2023 FMS (‡) 236 0 236 A - - 236 1 2023 MC (‡) 50 0 50 A - - 50 1 2023 NAVY 16 0 16 A - - 16 1 2023 Total 459 0 459 - - 459 1 2024 ARMY 237 0 237 237 1 2024 FMS (‡) 267 0 267 267 1 2024 MC (‡) 129 0 129 129 1 2024 NAVY 17 0 17 17 1 2024 Total 650 0 650 650 1 2025 ARMY 452 0 452 452 1 2025 FMS (‡) 103 0 103 103 1 2025 MC (‡) 136 0 136 136 1 2025 NAVY 7 0 7 7 1 2025 Total 698 0 698 698 1 2026 ARMY 649 0 649 649 1 2026 FMS (‡) 123 0 123 123 1 2026 MC (‡) 128 0 128 128 1 2026 Total 900 0 900 900 1 2027 ARMY 671 0 671 671 1 2027 FMS (‡) 161 0 161 161 1 2027 MC (‡) 68 0 68 68 1 2027 Total 900 0 900 900 (‡) (‡) (‡) A - O C T N O V D E C J A N LI 0648CC0007 - Javelin (AAWS-M) System Summary Army F E B M A R A P R M A Y J U N - J U L - A U G UNCLASSIFIED Page 18 of 23 - S E P - O C T - N O V - D E C - J A N - F E B P-1 Line #12 - M A R - A P R - M A Y - J U N - J U L A U G S E P Volume 1 - 144 === page 175 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0648CC0007 / Javelin (AAWS-M) System Summary Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: H06103 / Javelin Lightweight Command Launch Unit (CLU) Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Light Weight CLU Production Prior Years Deliveries: 5 1 2022 ARMY 491 0 491 - - - - - - - - - - - - - - - - - - - - 20 24 26 26 395 1 2023 ARMY 157 0 157 - - - - - - - - - - - - - - - - - - - - - - - - 157 1 2023 FMS (‡) 236 0 236 - - - - - - - - - - - - - - - - - - - - - - - - 236 1 2023 MC (‡) 50 0 50 - - - - - - - - - - - - - - - - - - - - - - - - 50 1 2023 NAVY 16 0 16 - - - - - - - - - - - - - - - - - - - - - - - - 16 1 2023 Total 459 0 459 - - - - - - - - - - - - - - - - - - - - - - - - 459 1 2024 ARMY 237 0 237 A - - - - - - - - - - - - - - - - 237 1 2024 FMS (‡) 267 0 267 A - - - - - - - - - - - - - - - - 267 1 2024 MC (‡) 129 0 129 A - - - - - - - - - - - - - - - - 129 1 2024 NAVY 17 0 17 A - - - - - - - - - - - - - - - - 17 1 2024 Total 650 0 650 - - - - - - - - - - - - - - - - 650 1 2025 ARMY 452 0 452 A - - 452 1 2025 FMS (‡) 103 0 103 A - - 103 1 2025 MC (‡) 136 0 136 A - - 136 1 2025 NAVY 7 0 7 A - - 7 1 2025 Total 698 0 698 - - 698 1 2026 ARMY 649 0 649 649 1 2026 FMS (‡) 123 0 123 123 1 2026 MC (‡) 128 0 128 128 1 2026 Total 900 0 900 900 1 2027 ARMY 671 0 671 671 1 2027 FMS (‡) 161 0 161 161 1 2027 MC (‡) 68 0 68 68 1 2027 Total 900 0 900 900 (‡) (‡) (‡) O C T N O V D E C J A N LI 0648CC0007 - Javelin (AAWS-M) System Summary Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 19 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #12 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 145 === page 176 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0648CC0007 / Javelin (AAWS-M) System Summary Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: H06103 / Javelin Lightweight Command Launch Unit (CLU) Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Light Weight CLU Production Prior Years Deliveries: 5 1 2022 ARMY 491 96 395 26 26 26 26 - - - - - 18 40 - 40 43 - - - 1 2023 ARMY 157 0 157 - - - - - - - - - - - - - 7 50 50 50 0 1 2023 FMS (‡) 236 0 236 - - - - 30 35 40 41 50 30 10 - - - - - - 0 1 2023 MC (‡) 50 0 50 - - - - - - - - - - - 50 - - - - - 0 1 2023 NAVY 16 0 16 - - - - - - - 4 - 2 - - 10 - - - - 1 2023 Total 459 0 459 - - - - 30 35 40 45 50 32 10 50 10 50 50 50 - - - - - - - 0 1 2024 ARMY 237 0 237 - - - - - - - - - - - - - - - - - - - - - - - 50 187 1 2024 FMS (‡) 267 0 267 - - - - - - - - - - - - - - - - - - - - - 51 66 - 150 (‡) 129 0 129 - - - - - - - - - - - - - - - - - - - - 16 - - - 113 17 0 17 - - - - - - - - - - - - - - - - - - - - 5 12 - - 0 650 0 650 - - - - - - - - - - - - - - - - - - - - 21 63 66 50 450 (‡) 7 50 50 50 0 0 1 2024 MC 1 2024 NAVY 1 2024 Total 1 2025 ARMY 452 0 452 - - - - - - - - - - - - - - - - - - - - - - - - 452 1 2025 FMS (‡) 103 0 103 - - - - - - - - - - - - - - - - - - - - - - - - 103 1 2025 MC (‡) 136 0 136 - - - - - - - - - - - - - - - - - - - - - - - - 136 1 2025 NAVY 7 0 7 - - - - - - - - - - - - - - - - - - - - - - - - 7 1 2025 Total 698 0 698 - - - - - - - - - - - - - - - - - - - - - - - - 698 1 2026 ARMY 649 0 649 A - - - - - - - - - - - - - - 649 1 2026 FMS (‡) 123 0 123 A - - - - - - - - - - - - - - 123 1 2026 MC (‡) 128 0 128 A - - - - - - - - - - - - - - 128 1 2026 Total 900 0 900 - - - - - - - - - - - - - - 900 1 2027 ARMY 671 0 671 A - - - - - - 671 1 2027 FMS (‡) 161 0 161 A - - - - - - 161 1 2027 MC (‡) 68 0 68 A - - - - - - 68 1 2027 Total 900 0 900 - - - - - - 900 (‡) (‡) O C T N O V D E C J A N LI 0648CC0007 - Javelin (AAWS-M) System Summary Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 20 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #12 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 146 === page 177 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0648CC0007 / Javelin (AAWS-M) System Summary Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: H06103 / Javelin Lightweight Command Launch Unit (CLU) Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Light Weight CLU Production Prior Years Deliveries: 5 1 2022 ARMY 491 491 0 0 1 2023 ARMY 157 157 0 0 1 2023 FMS (‡) 236 236 0 0 1 2023 MC (‡) 50 50 0 0 1 2023 NAVY 16 16 0 1 2023 Total 459 459 0 - - - - - - - - - - - - - 1 2024 ARMY 237 50 187 50 50 - - - - - 37 - - - 25 25 0 1 2024 FMS (‡) 267 117 150 - - 50 50 50 - - - - - - - - 0 1 2024 MC (‡) 129 16 113 - - - - - 50 50 13 - - - - - 0 1 2024 NAVY 17 17 0 - - - - - - - - - - - - - 1 2024 Total 650 200 450 50 50 50 50 50 50 50 50 - - - 25 25 - - - - - - - 1 2025 ARMY 452 0 452 - - - - - - - - 50 50 - - - 50 50 50 50 50 50 50 1 2025 FMS (‡) 103 0 103 - - - - - - - - 25 11 35 - - - 6 15 11 - - - - 0 1 2025 MC (‡) 136 0 136 - - - - - - - - - 11 25 50 50 - - - - - - - - 0 1 2025 NAVY 7 0 7 - - - - - - - - - - 7 - - - - - - - - - - 1 2025 Total 698 0 698 - - - - - - - - 75 72 67 50 50 50 56 65 61 50 50 50 2 - - - 0 1 2026 ARMY 649 0 649 - - - - - - - - - - - - - - - - - - - - 50 - 22 45 532 1 2026 FMS - - - - 0 - - - - - - - - (‡) (‡) (‡) 0 (‡) 123 0 123 - - - - - - - - - (‡) 128 0 128 - - - - - - - - - 900 0 900 - - - - - - - - - 3 8 - - - 8 16 0 75 75 532 - - - - - - 671 - - - - - - 161 - - - - - - - 68 - - - - - - - 900 0 671 - - - - - - - - - - - - - - - - - - 0 161 - - - - - - - - - - - - - - - - - - 1 2027 MC (‡) 68 0 68 - - - - - - - - - - - - - - - - - 1 2027 Total 900 0 900 - - - - - - - - - - - - - - - - - LI 0648CC0007 - Javelin (AAWS-M) System Summary Army UNCLASSIFIED Page 21 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #12 - 16 M A R 0 75 161 A U G 0 75 671 J U L 0 2 25 (‡) J U N - 2 4 - 28 FMS 4 - 3 ARMY 8 - - 50 2027 M A Y 0 50 2027 A P R - 25 1 M A R - 25 1 F E B - - Total J A N - 25 2026 D E C - - 1 8 - 4 MC 3 - 0 2026 N O V - - 1 O C T - - 4 A P R M A Y J U N J U L A U G S E P Volume 1 - 147 === page 178 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0648CC0007 / Javelin (AAWS-M) System Summary Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: H06103 / Javelin Lightweight Command Launch Unit (CLU) Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2031 M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Light Weight CLU Production Prior Years Deliveries: 5 1 2022 ARMY 491 491 0 0 1 2023 ARMY 157 157 0 0 1 2023 FMS (‡) 236 236 0 0 1 2023 MC (‡) 50 50 0 0 1 2023 NAVY 16 16 0 1 2023 Total 459 459 0 1 2024 ARMY 237 237 0 0 1 2024 FMS (‡) 267 267 0 0 1 2024 MC (‡) 129 129 0 0 1 2024 NAVY 17 17 0 1 2024 Total 650 650 0 1 2025 ARMY 452 452 0 0 1 2025 FMS (‡) 103 103 0 0 1 2025 MC (‡) 136 136 0 0 1 2025 NAVY 7 7 0 1 2025 Total 698 698 0 - - - - - - - 1 2026 ARMY 649 117 532 75 75 75 75 75 75 75 1 2026 FMS (‡) 123 123 0 - - - - - - - - 1 2026 MC (‡) 128 128 0 - - - - - - - - 1 2026 Total 900 368 532 75 75 75 75 75 75 75 1 2027 ARMY 671 0 671 - - - - - - - 1 2027 FMS (‡) 161 0 161 - - - - - - 1 2027 MC (‡) 68 0 68 - - - - - 1 2027 Total 900 0 900 - - - - - (‡) (‡) (‡) 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 O C T N O V D E C J A N LI 0648CC0007 - Javelin (AAWS-M) System Summary Army F E B M A R - - - - - - - - - - - - - - - - 7 0 0 7 - - - - - - - - - 68 75 75 75 75 75 75 75 75 - - 7 - - - - - - - - - - - - - - - - - - - - 75 75 75 75 75 75 75 M A Y 0 0 - A P R - J U N J U L A U G UNCLASSIFIED Page 22 of 23 S E P O C T N O V D E C J A N - - 3 - - 0 - 7 72 75 0 - - 65 3 - 75 75 75 75 75 F E B P-1 Line #12 - M A R A P R M A Y - - - - 0 0 J U N J U L A U G S E P Volume 1 - 148 0 === page 179 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0648CC0007 / Javelin (AAWS-M) System Summary Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: H06103 / Javelin Lightweight Command Launch Unit (CLU) Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 JJV Lightweight CLU Tucson AZ Orlando FL MSR For 2027 1-8-5 For 2027 MAX For 2027 240 900 900 ALT Prior to Oct 1 ALT After Oct 1 4 Reorder Manufacturing PLT 11 38 Total After Oct 1 ALT Prior to Oct 1 49 ALT After Oct 1 4 Manufacturing PLT 11 Total After Oct 1 38 49 Remarks: Minimum Sustaining Rate (MSR) is estimated and will be assessed by DCMA at completion of production capacity increase to 900. The FY 2026 P-21 is locked for editing; the deliveries occur 3rd qtr FY 2029 through 3rd qtr FY 2030. Ukraine supplemental funding Tranches 1, 2, and 26 procure additional Army Lightweight Command Launch Units (LWCLUs) as follows: - Tranche 1: 114 LWCLUs in FY 2022 with deliveries 4th qtr FY 2025 through 2nd qtr FY 2026 - Tranche 1: 141 LWCLUs in FY 2022 with deliveries 4th qtr FY 2026 through 1st qtr FY 2027 - Tranche 2: 150 LWCLUs in FY 2022 with deliveries 2nd qtr FY 2027 through 3rd qtr FY 2027 - Tranche 26: 50 LWCLUs in FY 2024 with deliveries 4th qtr FY 2028 through 1st qtr FY 2029 Indo-Pacific (IND4) supplemental funding procures additional Army LWCLUs as follows: - FY 2025: 2 LWCLUs on FY 2026 delivery order (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0648CC0007 - Javelin (AAWS-M) System Summary Army UNCLASSIFIED Page 23 of 23 P-1 Line #12 Volume 1 - 149 === page 180 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 2104C59300 / TOW 2 System Summary Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 30: Anti-Tank/ Assault Missile Sys Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 180,498 551 - - - - - - - - - 181,049 4,421.327 122.295 11.731 - - - - - - - - 4,555.353 238.047 4,183.280 238.047 4,421.327 122.295 122.295 To FY 2031 Complete Total - - - - - - - - - 238.047 11.731 - - - - - - - - 4,317.306 - - - - - - - - - 238.047 11.731 - - - - - - - - 4,555.353 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - - - - - - - - - - 25.161 Gross/Weapon System Unit Cost ($ in Thousands) 24.495 221.951 - Description: Tube launched, Optically tracked, Wireless guided (TOW) missiles (BGM-71 Series) are combat proven munitions that provide heavy anti-armor/assault capability to the Army's Infantry Brigade Combat Teams (IBCT), Stryker Brigade Combat Teams (SBCT) and Armor Brigade Combat Teams (ABCT). TOW missiles continue to be used as the weapon of choice in precision combat engagements. TOW missiles are also the primary heavy anti-armor/ assault missile for the U.S. Marine Corps (USMC) and more than 43 allied nations. Warfighters also employ TOW missiles against buildings and field fortifications, taking advantage of the missile's precision assault capabilities. The TOW weapon system is an Army-led, Acquisition Category (ACAT) IC Major Defense Acquisition Program (MDAP) that has joint interest with the USMC. The TOW weapon system includes the Improved Target Acquisition System (ITAS) launcher, TOW missiles, and associated tactical training aids/devices. The ITAS is a combat proven TOW missile launcher that provides long-range, lethal anti-armor and precision assault fires capability for Active, Reserve, and National Guard component IBCT and SBCT across a spectrum of operational environments. The USMC employs the TOW missile from its ITAS derived M41A7 Saber launchers and Anti-Tank Guided Missile (ATGM) vehicles. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 551 122.295 551 122.295 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - 11.731 - - - - - - - - - - - - - - - 11.731 - - - - - - - Justification: PE C59403: TOW has no FY 2027 funding requests, in support of the US Army's decision to cease TOW missile procurement in FY 2026. LI 2104C59300 - TOW 2 System Summary Army UNCLASSIFIED Page 1 of 1 P-1 Line #13 Volume 1 - 150 === page 181 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 30: Anti-Tank/ Assault Missile Sys ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0603778A, 0205778A Line Item MDAP/MAIS Code: 260 Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - 5,490 4,824 - 4,824 5,244 4,878 4,740 5,292 Continuing Continuing 1,199.177 1,155.071 1,058.093 - 1,058.093 1,212.395 1,150.059 1,148.640 1,313.822 Continuing Continuing 30.913 30.000 43.156 - 43.156 49.106 46.107 45.470 51.694 Continuing Continuing 12,725.025 1,168.264 1,125.071 1,014.937 - 1,014.937 1,163.289 1,103.952 1,103.170 1,262.128 Continuing Continuing 30.913 30.000 43.156 49.106 - 49.106 46.107 45.470 51.694 12,755.938 1,198.264 1,168.227 1,064.043 - 1,064.043 1,209.396 1,149.422 1,154.864 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 12,725.025 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) - To FY 2031 Complete - Total Continuing Continuing 1,262.128 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - 210.395 219.339 - 219.339 231.197 235.764 242.329 248.266 Continuing Continuing Description: Guided Multiple Launch Rocket System (GMLRS) rockets are surface-to-surface artillery rockets fired from the Multiple Launch Rocket System (MLRS) and High Mobility Artillery Rocket System (HIMARS) launchers. GMLRS rockets provide 24/7, all-weather precision fires to engage both area and point targets at short, medium, and long ranges. The U.S. Marine Corps also procures GMLRS rockets through the Army project office. The GMLRS Program currently consists of two variants in full rate production which are the GMLRS Unitary and the GMLRS Alternative Warhead (AW). The GMLRS Unitary utilizes a 200-pound high explosive warhead to engage point targets with limited collateral damage. The GMLRS AW was developed as a non-cluster munition to engage area or imprecisely located targets. The Enhanced Alternative Warhead (EAW) engineering change proposal, a lethality enhancement of the GMLRS AW, will begin initial production in FY 2027. The Extended Range (ER) GMLRS Unitary variant was developed to increase the current maximum design range. The ER GMLRS Unitary rocket is currently in production, and the ER GMLRS AW will begin initial production in FY 2027. Secondary Distribution Army FY 2025 Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army FY 2026 - 1,198.264 1,198.264 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 5,490 4,824 - 4,824 5,244 4,878 4,740 5,292 1,168.227 1,064.043 - 1,064.043 1,209.396 1,149.422 1,154.864 1,262.128 5,490 4,824 - 4,824 5,244 4,878 4,740 5,292 1,168.227 1,064.043 - 1,064.043 1,209.396 1,149.422 1,154.864 1,262.128 UNCLASSIFIED Page 1 of 29 P-1 Line #14 Volume 1 - 151 === page 182 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 30: Anti-Tank/ Assault Missile Sys ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Program Elements for Code B Items: N/A Other Related Program Elements: 0603778A, 0205778A Line Item MDAP/MAIS Code: 260 Exhibits Schedule Exhibit Type Title* Subexhibits P-5 C64416 / EXTENDED RANGE GMLRS UNITARY (ERG-U) P-5a P-5 C64417 / EXTENDED RANGE GMLRS ALTERNATIVE WARHEAD (ERG-AW) P-5a, P-21 P-5 C64418 / GMLRS ALTERNATIVE WARHEAD (GMLRS-AW) P-5a, P-21 P-5 C64419 / GMLRS UNITARY (GMLRS-U) P-5a, P-21 P-5 C65404 / GUIDED MLRS ROCKET (GMLRS) P-5a P-40 Total Gross/Weapon System Cost ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / - - / - - / - - / - - / - 2,640 / 541.926 - / - - / - 2,640 / 447.278 2,928 / 520.481 - / 12,725.025 - / 1,199.177 - / 12,725.025 - / 1,199.177 210 / 135.867 - - / 0.000 - / - - / - 300 / 187.070 - / - 300 / 187.070 1,596 / 350.542 - / - 1,596 / 350.542 2,928 / 520.481 - / - / - - / - 4,824 / 1,058.093 - / - / 30.000 5,490 / 1,155.071 - - - / - / - 4,824 / 1,058.093 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 Base procurement dollars in the amount of $1,058.093 million supports the procurement of 4,824 rockets. In FY 2027, the Army will procure 2,928 Standard Unitary, 1,596 Standard AW, and 300 ER GMLRS AW in support of the Army's Total Munitions Requirement (TMR). The Army intends to convert any price advantage created through contract negotiations, other service procurement, and/or foreign military sales to support procurement of additional GMLRS rockets. In previous years, procurement of all GMLRS and ER-GMLRS variants was under C65404. Beginning in FY 2026, the Army established separate sub-lines for each variant to properly account for different cost, schedule, and performance metrics. The Army is executing procurement of missiles under a four-year Multi-Year Procurement (MYP) contract covering FY 2024 - FY 2027. FY 2027 Advance Procurement dollars in the amount of $49.106 million procures long lead items for GMLRS production in FY 2028. Advance Procurement dollars are required to reduce production lead time of standard range GMLRS and ER-GMLRS from 36 months to 24 months to mitigate supply chain volatility. Advance Procurement is required annually to maintain a 24-month lead time. Funding decreased in FY 2027 due to a decrease in quantities to be procured. The total annual production capacity is 14,004 rockets inclusive of all variants. The Army Acquisition Objective is 140,004. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 2 of 29 P-1 Line #14 Volume 1 - 152 === page 183 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C64416 / EXTENDED RANGE GMLRS UNITARY (ERG-U) MDAP/MAIS Code: FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 210 - - - Gross/Weapon System Cost ($ in Millions) - - 135.867 - - - Less PY Advance Procurement ($ in Millions) - - - - - Net Procurement (P-1) ($ in Millions) - - - - - Plus CY Advance Procurement ($ in Millions) - - - - - Total Obligation Authority ($ in Millions) - - - - - 135.867 135.867 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost Extended Range - - - - - - Production Support - - - - - - Production Verification Testing - - - - - First Destination Transportation - - - - Production Engineering Support - - - Subtotal: Recurring Cost - - - - Software Support - Subtotal: Recurring Cost - (†) GMLRS Unitary Subtotal: Flyaway Cost 559.519 210 117.499 - - - - - - - - - - - 7.967 - - - - - - - - - - - - 1.202 - - - - - - - - - - - - - 0.044 - - - - - - - - - - - - - - 3.132 - - - - - - - - - - - - - - - 129.844 - - - - - - - - - - - - - - - 129.844 - - - - - - - - - - - - - - - - 0.868 - - - - - - - - - - - - - - - - 0.868 - - - - - - - - - - - - - - - - 0.868 - - - - - - - - - - - - - - - - 4.512 - - - - - - - - - Software Cost Recurring Cost Subtotal: Software Cost Support - Engineering Change Proposals Cost Engineering Change Proposals - LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 3 of 29 P-1 Line #14 Volume 1 - 153 === page 184 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C64416 / EXTENDED RANGE GMLRS UNITARY (ERG-U) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) Subtotal: Support Engineering Change Proposals Cost FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) Total Cost Qty ($ K) (Each) ($ M) - - - - - - - - 4.512 - - - - - - - - - Support - Program Management Cost Government Management - - - - - - - - 0.643 - - - - - - - - - Subtotal: Support - Program Management Cost - - - - - - - - 0.643 - - - - - - - - - Gross/Weapon System Cost - - - - - - - 210 135.867 - - - - - - - - - Remarks: There is no funding in FY 2027 for this sub-line because the Army is shifting procurement from ER-GMLRS Unitary to ER-GMLRS AW production. The unit cost shown for FY 2026 includes the cost for the rocket and the launch pod container. Procurement quantities refer to the number of individual rockets. The ER GMLRS Unitary utilizes a 200-pound high explosive warhead to engage point targets with limited collateral damage and extends the range of the currently fielded GMLRS Unitary rocket. Production Support activities include industrial engineering services, bunker storage, property management/repair of government furnished equipment, and production and quality personnel in support of manufacturing efforts. Engineering Change Proposals cover activities associated with resolving manufacturing-related changes that arise due to emerging statutory and regulatory requirements, supply chain disruptions, obsolescence, process enhancements and quality improvements. The C64416 sub-line was established in FY 2026 to separately account for the ER GMLRS Unitary variant. In previous years the ER GMLRS Unitary was procured under the C65404 sub-line. Prior years' history can be found on the C65404 P-5. Secondary Distribution Army Total: Secondary Distribution (†) FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total Quantity - 210 - - - Total Obligation Authority - 135.867 - - - Quantity - 210 - - - Total Obligation Authority - 135.867 - - - indicates the presence of a P-5a LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 4 of 29 P-1 Line #14 Volume 1 - 154 === page 185 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements Extended Range GMLRS Unitary O O C FY Contractor and Location 2026 Lockheed Martin M.&F.C Sys. / Dallas,TX P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Method/Type or Funding Vehicle SS / IDIQ Location of PCO Aviation and Missile Command Item Number / Title [DODIC]: C64416 / EXTENDED RANGE GMLRS UNITARY (ERG-U) Award Date Date of First Delivery Mar 2026 Feb 2028 Qty (Each) 210 Specs Date Unit Cost Avail Revision Now? Available ($ K) 559.519 RFP Issue Date Y Remarks: Lockheed Martin is currently the industry source that is both facilitized and qualified to produce the ER GMLRS rocket. Procurement quantities refer to the number of individual rockets. Acronyms: SS (Sole Source) / IDIQ (Indefinite Delivery Indefinite Quantity) LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 5 of 29 P-1 Line #14 Volume 1 - 155 === page 186 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C64417 / EXTENDED RANGE GMLRS ALTERNATIVE WARHEAD (ERG-AW) MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base Procurement Quantity (Units in Each) - - - Gross/Weapon System Cost ($ in Millions) - - 0.000 Less PY Advance Procurement ($ in Millions) - - Net Procurement (P-1) ($ in Millions) - - Plus CY Advance Procurement ($ in Millions) - - Total Obligation Authority ($ in Millions) - - FY 2027 OOC FY 2027 Total 300 - 300 187.070 - 187.070 - 2.114 - 2.114 0.000 184.956 - 184.956 2.114 4.589 - 4.589 2.114 189.545 - 189.545 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost Extended Range GMLRS Alternative Warhead (ER-GMLRS - - - - - - - - - Production Support - - - - - - - - - Ind Maint/Init Prod Fac - - - - - - - - - Production Verification Testing - - - - - - - - First Destination Transportation - - - - - - - Production Engineering Support - - - - - - Subtotal: Recurring Cost - - - - - - - - - - - Software Support - - - - Subtotal: Recurring Cost - - - - - - - - AW) 558.393 300 167.518 - - - - - 10.352 - - - - - 0.911 - - - - - - 1.119 - - - - - - 0.038 - - - - - - 3.198 - - - - - 183.136 - - - - - - - - - - - - - - - - - - - - - - - - 558.393 300 167.518 - - 10.352 - - 0.911 - - - 1.119 - - - - 0.038 - - - - - 3.198 - - - - - 183.136 183.136 - - - - - 183.136 - 1.337 - - - - - 1.337 - 1.337 - - - - - 1.337 - 1.337 - - - - - 1.337 (†) Subtotal: Flyaway Cost Software Cost Recurring Cost Subtotal: Software Cost Support - Engineering Change Proposals Cost LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 6 of 29 P-1 Line #14 Volume 1 - 156 === page 187 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C64417 / EXTENDED RANGE GMLRS ALTERNATIVE WARHEAD (ERG-AW) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) Engineering Change Proposals FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - - - - - - - - - - 1.607 - - - - - 1.607 - - - - - - - - - - - 1.607 - - - - - 1.607 - - - - - - - - - - - 0.991 - - - - - 0.991 Subtotal: Support - Program Management Cost - - - - - - - - - - - 0.991 - - - - - 0.991 Gross/Weapon System Cost - - - - - - - - 0.000 - 300 187.070 - - - - 300 187.070 Subtotal: Support Engineering Change Proposals Cost Support - Program Management Cost Government Management Remarks: ER GMLRS AW will cut in to production in FY 2027. The unit cost shown for FY 2027 includes the cost for the rocket and the launch pod container. Procurement quantities refer to the number of individual rockets. The ER GMLRS AW variant extends the range of the currently fielded GMLRS AW rocket. The ER GMLRS AW was developed as a non-cluster munition to engage area or imprecisely located targets. Production Support activities include industrial engineering services, bunker storage, property management/repair of government furnished equipment, and production and quality personnel in support of manufacturing efforts. Engineering Change Proposals cover activities associated with resolving manufacturing-related changes that arise due to emerging statutory and regulatory requirements, supply chain disruptions, obsolescence, process enhancements and quality improvements. ECP costs in FY 2027 are driven by guidance set obsolescence mitigation. The C64417 sub-line was established in FY 2026 to separately account for the ER GMLRS AW variant. In previous years the ER GMLRS AW was procured under the C65404 sub-line. Prior years' history can be found on the C65404 P-5. Secondary Distribution Army Total: Secondary Distribution (†) FY 2025 FY 2027 Base FY 2026 Quantity - - Total Obligation Authority - 2.114 Quantity - - Total Obligation Authority - 2.114 FY 2027 OOC FY 2027 Total 300 - 300 189.545 - 189.545 300 - 300 189.545 - 189.545 indicates the presence of a P-5a LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 7 of 29 P-1 Line #14 Volume 1 - 157 === page 188 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements Extended Range GMLRS Alternative Warhead (ER-GMLRS (†) AW) (†) O O C FY Contractor and Location 2027 Lockheed Martin M.&F.C Sys. / Dallas, TX P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Method/Type or Funding Vehicle Location of PCO Aviation and Missile Command SS / IDIQ Item Number / Title [DODIC]: C64417 / EXTENDED RANGE GMLRS ALTERNATIVE WARHEAD (ERG-AW) Award Date Date of First Delivery Mar 2027 Feb 2029 Qty (Each) 300 Specs Date Unit Cost Avail Revision Now? Available ($ K) 558.393 RFP Issue Date Y indicates the presence of a P-21 Remarks: Lockheed Martin is currently the industry source that is both facilitized and qualified to produce the ER GMLRS rocket. Acronyms: SS (Sole Source) / IDIQ (Indefinite Delivery Indefinite Quantity) LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 8 of 29 P-1 Line #14 Volume 1 - 158 === page 189 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C64417 / EXTENDED RANGE GMLRS ALTERNATIVE WARHEAD (ERG-AW) Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Extended Range GMLRS Alternative Warhead (ER-GMLRS AW) 1 2027 ARMY 300 0 300 A - - - - - - - - - - - - - - - - - - - 300 1 2027 FMS (‡) 162 0 162 A - - - - - - - - - - - - - - - - - - - 162 1 2027 Total 462 0 462 - - - - - - - - - - - - - - - - - - - 462 O C T N O V D E C LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 29 S E P O C T N O V D E C J A N F E B P-1 Line #14 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 159 === page 190 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C64417 / EXTENDED RANGE GMLRS ALTERNATIVE WARHEAD (ERG-AW) Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Extended Range GMLRS Alternative Warhead (ER-GMLRS AW) 1 2027 ARMY 300 0 300 - - - - 18 24 24 24 24 24 24 24 24 30 30 30 1 2027 FMS (‡) 162 0 162 - - - - 12 12 12 12 12 12 12 12 12 18 18 18 1 2027 Total 462 0 462 - - - - 30 36 36 36 36 36 36 36 36 48 48 48 O C T N O V D E C LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 29 S E P O C T N O V D E C J A N 0 0 F E B P-1 Line #14 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 160 0 === page 191 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: C64417 / EXTENDED RANGE GMLRS ALTERNATIVE WARHEAD (ERG-AW) Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Lockheed Martin M.&F.C Sys. - Dallas, TX MSR For 2027 1-8-5 For 2027 MAX For 2027 240 2,004 2,004 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 6 24 Total After Oct 1 ALT Prior to Oct 1 30 ALT After Oct 1 0 Manufacturing PLT 6 Total After Oct 1 24 30 Remarks: Manufacturing production lead time (PLT) assumes award of Advance Procurement, otherwise manufacturing PLT is 36 months. (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 11 of 29 P-1 Line #14 Volume 1 - 161 === page 192 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C64418 / GMLRS ALTERNATIVE WARHEAD (GMLRS-AW) MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) - - 2,640 1,596 - 1,596 Gross/Weapon System Cost ($ in Millions) - - 541.926 350.542 - 350.542 Less PY Advance Procurement ($ in Millions) - - Net Procurement (P-1) ($ in Millions) - - Plus CY Advance Procurement ($ in Millions) - - Total Obligation Authority ($ in Millions) - - - 14.588 - 14.588 335.954 - 335.954 14.588 16.173 - 16.173 556.514 352.127 - 352.127 541.926 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - 205.275 - 219.638 - - 219.638 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost Standard Range - - - - - - Production Support - - - - - - Ind Maint/Init Prod Fac - - - - - - Production Verification Testing - - - - - First Destination Transportation - - - - Production Engineering Support - - - Subtotal: Recurring Cost - - - - Software Support - Subtotal: Recurring Cost - (†) GMLRS AW Subtotal: Flyaway Cost 187.033 2,640 493.766 - - 16.745 - - 2.740 - - - - - - - - - - - - - - - - - - - - - - - - - 198.118 1,596 316.197 - - - - - 12.418 - - - - - 6.954 - - - 2.420 - - 6.123 - - - 0.512 - - 0.201 - - - 1.716 - - 1.294 - - - 517.899 - - - - - 517.899 - - - - - - 3.463 - - - - - 3.463 - - - - - - 3.463 - - - - - 17.997 198.118 1,596 316.197 - - 12.418 - - 6.954 - - - 6.123 - - - - 0.201 - - - - - 1.294 343.187 - - - - - 343.187 343.187 - - - - - 343.187 - 2.428 - - - - - 2.428 - 2.428 - - - - - 2.428 - - 2.428 - - - - - 2.428 - - 3.128 - - - - - 3.128 Software Cost Recurring Cost Subtotal: Software Cost Support - Engineering Change Proposals Cost Engineering Change Proposals - LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 12 of 29 P-1 Line #14 Volume 1 - 162 === page 193 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C64418 / GMLRS ALTERNATIVE WARHEAD (GMLRS-AW) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) Subtotal: Support Engineering Change Proposals Cost FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - - - - - - - 17.997 - - 3.128 - - - - - 3.128 Support - Program Management Cost Government Management - - - - - - - - 2.566 - - 1.799 - - - - - 1.799 Subtotal: Support - Program Management Cost - - - - - - - - 2.566 - - 1.799 - - - - - 1.799 Gross/Weapon System Cost - - - - - - 2,640 541.926 1,596 350.542 - - - 1,596 350.542 205.275 219.638 219.638 Remarks: The unit cost shown for FY 2027 includes the cost for the rocket and the launch pod container. Procurement quantities refer to the number of individual rockets. The GMLRS AW was developed as a non-cluster munition to engage area or imprecisely located targets. Production Support activities include industrial engineering services, bunker storage, property management/repair of government furnished equipment, and production and quality personnel in support of manufacturing efforts. Engineering Change Proposals cover activities associated with resolving manufacturing-related changes that arise due to emerging statutory and regulatory requirements, supply chain disruptions, obsolescence, process enhancements and quality improvements. ECP costs in FY 2027 are driven by guidance set obsolescence mitigation. The C64418 sub-line was established in FY 2026 to separately account for the GMLRS AW variant. In previous years the GMLRS AW was procured under the C65404 sub-line. Prior years' history can be found on the C65404 P-5. Secondary Distribution Army Total: Secondary Distribution (†) FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total Quantity - 2,640 1,596 - 1,596 Total Obligation Authority - 556.514 352.127 - 352.127 Quantity - 2,640 1,596 - 1,596 Total Obligation Authority - 556.514 352.127 - 352.127 indicates the presence of a P-5a LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 13 of 29 P-1 Line #14 Volume 1 - 163 === page 194 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 O O C Cost Elements (†) Standard Range GMLRS AW (†) Standard Range GMLRS AW (†) P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: C64418 / GMLRS ALTERNATIVE WARHEAD (GMLRS-AW) Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($ K) FY Contractor and Location 2026 Lockheed Martin M.&F.C Sys. / Dallas, TX SS / IDIQ Aviation and Missile Command Mar 2026 Feb 2028 2,640 187.033 Y 2027 Lockheed Martin M.&F.C Sys. / Dallas, TX SS / IDIQ Aviation and Missile Command Mar 2027 Feb 2029 1,596 198.118 Y (Each) RFP Issue Date indicates the presence of a P-21 Remarks: Lockheed Martin is currently the industry source that is both facilitized and qualified to produce the GMLRS rocket. Procurement quantities refer to the number of individual rockets. Acronyms: SS (Sole Source) / IDIQ (Indefinite Delivery Indefinite Quantity) LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 14 of 29 P-1 Line #14 Volume 1 - 164 === page 195 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE Item Number / Title [DODIC]: C64418 / GMLRS ALTERNATIVE WARHEAD (GMLRS-AW) Fiscal Year 2026 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Standard Range GMLRS AW 1 2026 ARMY 2,640 0 2,640 A - - - - - - - - - - - - - - - - - - - 2,640 1 2026 FMS (‡) 1,398 0 1,398 A - - - - - - - - - - - - - - - - - - - 1,398 1 2026 MC (‡) 6 0 6 A - - - - - - - - - - - - - - - - - - - 6 1 2026 Total 4,044 0 4,044 - - - - - - - - - - - - - - - - - - - 4,044 1 2027 ARMY 1,596 0 1,596 A - - - - - - - 1,596 1 2027 FMS (‡) 588 0 588 A - - - - - - - 588 1 2027 MC (‡) 6 0 6 A - - - - - - - 6 1 2027 Total 2,190 0 2,190 - - - - - - - 2,190 O C T N O V D E C LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 29 S E P O C T N O V D E C J A N F E B P-1 Line #14 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 165 === page 196 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE Item Number / Title [DODIC]: C64418 / GMLRS ALTERNATIVE WARHEAD (GMLRS-AW) Fiscal Year 2028 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B B A L A N C E Fiscal Year 2029 Calendar Year 2029 M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Standard Range GMLRS AW 1 2026 ARMY 2,640 0 2,640 - - - - 216 216 216 216 222 222 222 222 222 222 222 222 - 0 1 2026 FMS (‡) 1,398 0 1,398 - - - - - 114 114 114 114 114 114 114 120 120 120 120 120 0 1 2026 MC (‡) 6 0 6 - - - - 6 - - - - - - - - - - - - 1 2026 Total 4,044 0 4,044 - - - - 222 330 330 330 336 336 336 336 342 342 342 342 120 - - - - - - - 0 1 2027 ARMY 1,596 0 1,596 - - - - - - - - - - - - - - - - 132 132 132 132 132 132 132 132 540 1 2027 FMS (‡) 588 0 588 - - - - - - - - - - - - - - - - 48 48 48 48 48 48 48 48 204 1 2027 MC (‡) 6 0 6 - - - - - - - - - - - - - - - - 6 - - - - - - - 0 1 2027 Total 2,190 0 2,190 - - - - - - - - - - - - - - - - 186 180 180 180 180 180 180 180 744 F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 29 S E P O C T N O V D E C J A N 0 P-1 Line #14 Volume 1 - 166 === page 197 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C64418 / GMLRS ALTERNATIVE WARHEAD (GMLRS-AW) Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2031 M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Standard Range GMLRS AW 1 2026 ARMY 2,640 2,640 0 0 1 2026 FMS (‡) 1,398 1,398 0 0 1 2026 MC (‡) 6 6 0 1 2026 Total 4,044 4,044 0 - - - - 1 2027 ARMY 1,596 1,056 540 132 132 138 138 0 1 2027 FMS (‡) 588 384 204 48 48 54 54 0 1 2027 MC (‡) 6 6 0 - - - - 1 2027 Total 2,190 1,446 744 180 180 192 192 O C T N O V D E C J A N 0 LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army - - - - - - - - - - - - - - - - - - - - 0 0 F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 29 S E P O C T N O V D E C J A N F E B P-1 Line #14 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 167 0 === page 198 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: C64418 / GMLRS ALTERNATIVE WARHEAD (GMLRS-AW) Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Lockheed Martin M.&F.C Sys. - Dallas, TX MSR For 2027 1-8-5 For 2027 MAX For 2027 2,400 13,002 13,002 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 9 Manufacturing PLT 6 Total After Oct 1 24 30 Remarks: Manufacturing production lead time (PLT) assumes award of Advance Procurement, otherwise manufacturing PLT is 36 months. The MSR shown is the total for GMLRS AW and GMLRS Unitary combined. (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 18 of 29 P-1 Line #14 Volume 1 - 168 === page 199 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C64419 / GMLRS UNITARY (GMLRS-U) MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) - - 2,640 2,928 - 2,928 Gross/Weapon System Cost ($ in Millions) - - 447.278 520.481 - 520.481 Less PY Advance Procurement ($ in Millions) - - Net Procurement (P-1) ($ in Millions) - - Plus CY Advance Procurement ($ in Millions) - - Total Obligation Authority ($ in Millions) - - - 26.454 - 26.454 494.027 - 494.027 26.454 28.344 - 28.344 473.732 522.371 - 522.371 447.278 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - 169.423 - 177.760 - - 177.760 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost Standard Range - - - - - - Production Support - - - - - - Ind Maint/Init Prod Fac - - - - - - Production Verification Testing - - - - - First Destination Transportation - - - - Production Engineering Support - - - Subtotal: Recurring Cost - - - - Software Support - Subtotal: Recurring Cost - (†) GMLRS Unitary Subtotal: Flyaway Cost 154.728 2,640 408.481 - - 13.783 - - 2.260 - - - - - - - - - - - - - - - - - - - - - - - - - 166.307 2,928 486.947 - - - - - 16.746 - - - - - 2.435 - - - 1.218 - - 1.279 - - - 0.300 - - 0.345 - - - 1.416 - - 1.904 - - - 427.458 - - - - - 427.458 - - - - - - 2.856 - - - - - 2.856 - - - - - - 2.856 - - - - - 14.846 166.307 2,928 486.947 - - 16.746 - - 2.435 - - - 1.279 - - - - 0.345 - - - - - 1.904 509.656 - - - - - 509.656 509.656 - - - - - 509.656 - 3.573 - - - - - 3.573 - 3.573 - - - - - 3.573 - - 3.573 - - - - - 3.573 - - 4.604 - - - - - 4.604 Software Cost Recurring Cost Subtotal: Software Cost Support - Engineering Change Proposals Cost Engineering Change Proposals - LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 19 of 29 P-1 Line #14 Volume 1 - 169 === page 200 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C64419 / GMLRS UNITARY (GMLRS-U) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) Subtotal: Support Engineering Change Proposals Cost FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - - - - - - - 14.846 - - 4.604 - - - - - 4.604 Support - Program Management Cost Government Management - - - - - - - - 2.117 - - 2.648 - - - - - 2.648 Subtotal: Support - Program Management Cost - - - - - - - - 2.117 - - 2.648 - - - - - 2.648 Gross/Weapon System Cost - - - - - - 2,640 447.278 2,928 520.481 - - - 2,928 520.481 169.423 177.760 177.760 Remarks: The unit cost shown for FY 2027 includes the cost for the rocket and the launch pod container. Procurement quantities refer to the number of individual rockets. The GMLRS Unitary utilizes a 200-pound high explosive warhead to engage point targets with limited collateral damage. Production Support activities include industrial engineering services, bunker storage, property management/repair of government furnished equipment, and production and quality personnel in support of manufacturing efforts. Engineering Change Proposals cover activities associated with resolving manufacturing-related changes that arise due to emerging statutory and regulatory requirements, supply chain disruptions, obsolescence, process enhancements and quality improvements. ECP costs in FY 2027 are driven by guidance set obsolescence mitigation. The C64419 sub-line was established in FY 2026 to separately account for the GMLRS Unitary variant. In previous years the GMLRS Unitary was procured under the C65404 sub-line. Prior years' history can be found on the C65404 P-5. Secondary Distribution Army Total: Secondary Distribution (†) FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total Quantity - 2,640 2,928 - 2,928 Total Obligation Authority - 473.732 522.371 - 522.371 Quantity - 2,640 2,928 - 2,928 Total Obligation Authority - 473.732 522.371 - 522.371 indicates the presence of a P-5a LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 20 of 29 P-1 Line #14 Volume 1 - 170 === page 201 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 O O C Cost Elements (†) Standard Range GMLRS Unitary (†) Standard Range GMLRS Unitary (†) P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: C64419 / GMLRS UNITARY (GMLRS-U) Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($ K) FY Contractor and Location 2026 Lockheed Martin M.&F.C Sys. / Dallas, TX SS / IDIQ Aviation and Missile Command Mar 2026 Feb 2028 2,640 154.728 Y 2027 Lockheed Martin M.&F.C Sys. / Dallas, TX SS / IDIQ Aviation and Missile Command Mar 2027 Feb 2029 2,928 166.307 Y (Each) RFP Issue Date indicates the presence of a P-21 Remarks: Lockheed Martin is currently the industry source that is both facilitized and qualified to produce the GMLRS rocket. Procurement quantities refer to the number of individual rockets. Acronyms: SS (Sole Source) / IDIQ (Indefinite Delivery Indefinite Quantity) LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 21 of 29 P-1 Line #14 Volume 1 - 171 === page 202 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C64419 / GMLRS UNITARY (GMLRS-U) Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Standard Range GMLRS Unitary 1 2026 ARMY 2,640 0 2,640 A - - - - - - - - - - - - - - - - - - - 2,640 1 2026 FMS (‡) 4,140 0 4,140 A - - - - - - - - - - - - - - - - - - - 4,140 1 2026 Total 6,780 0 6,780 - - - - - - - - - - - - - - - - - - - 6,780 1 2027 ARMY 2,928 0 2,928 A - - - - - - - 2,928 1 2027 FMS (‡) 1,512 0 1,512 A - - - - - - - 1,512 1 2027 Total 4,440 0 4,440 - - - - - - - 4,440 O C T N O V D E C LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 22 of 29 S E P O C T N O V D E C J A N F E B P-1 Line #14 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 172 === page 203 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C64419 / GMLRS UNITARY (GMLRS-U) Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N B A L A N C E Fiscal Year 2029 Calendar Year 2029 F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Standard Range GMLRS Unitary 1 2026 ARMY 2,640 0 2,640 - - - - 216 216 216 216 222 222 222 222 222 222 222 222 1 2026 FMS (‡) 4,140 0 4,140 - - - - 342 342 342 342 342 342 348 348 348 348 348 348 1 2026 Total 6,780 0 6,780 - - - - 558 558 558 558 564 564 570 570 570 570 570 570 - - - - - - - - 0 1 2027 ARMY 2,928 0 2,928 - - - - - - - - - - - - - - - - 240 240 240 240 246 246 246 246 984 1 2027 FMS (‡) 1,512 0 1,512 - - - - - - - - - - - - - - - - 126 126 126 126 126 126 126 126 504 1 2027 Total 4,440 0 4,440 - - - - - - - - - - - - - - - - 366 366 366 366 372 372 372 372 1,488 F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 23 of 29 S E P O C T N O V D E C J A N 0 0 P-1 Line #14 Volume 1 - 173 === page 204 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C64419 / GMLRS UNITARY (GMLRS-U) Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2031 M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Standard Range GMLRS Unitary 1 2026 ARMY 2,640 2,640 0 1 2026 FMS (‡) 4,140 4,140 0 0 1 2026 Total 6,780 6,780 0 - - - - 1 2027 ARMY 2,928 1,944 984 246 246 246 246 1 2027 FMS (‡) 1,512 1,008 504 126 126 126 126 1 2027 Total 4,440 2,952 1,488 372 372 372 372 O C T N O V D E C J A N 0 LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army - - - - - - - - - - - - - - - - - - - - 0 0 0 F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 24 of 29 S E P O C T N O V D E C J A N F E B P-1 Line #14 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 174 0 === page 205 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: C64419 / GMLRS UNITARY (GMLRS-U) Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Lockheed Martin M.&F.C Sys. - Dallas, TX MSR For 2027 1-8-5 For 2027 MAX For 2027 2,400 7,998 7,998 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 9 Manufacturing PLT 6 Total After Oct 1 24 30 Remarks: Manufacturing production lead time (PLT) assumes award of Advance Procurement, otherwise manufacturing PLT is 36 months. The MSR shown is the total for GMLRS AW and GMLRS Unitary combined. (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 25 of 29 P-1 Line #14 Volume 1 - 175 === page 206 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C65404 / GUIDED MLRS ROCKET (GMLRS) MDAP/MAIS Code: Resource Summary Prior Years FY 2027 Base FY 2027 OOC FY 2027 Total - - - - 1,199.177 30.000 - - - 30.913 30.000 - - - 12,725.025 1,168.264 0.000 - - - 30.913 30.000 - - - - 12,755.938 1,198.264 0.000 - - - Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) - 12,725.025 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Qty Total Cost 60,712 7,926.456 (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost Tactical GMLRS Hardware (†) GMLRS Rocket 130.558 - - - - - - - - - - - - - - - (†) - - 2,948.688 190.508 5,076 967.020 - - - - - - - - - - - - Launch Pod Container- Standard Range Build to Print Pod - - 307.424 69.449 761 52.851 - - - - - - - - - - - - Launch Pod Container- Extended Range Pod - - 4.052 195.129 85 16.586 - - - - - - - - - - - - Production Support - - 157.393 - - 61.710 - - - - - - - - - - - - Ind Maint/Init Prod Fac - - 493.551 - - 5.269 - - - - - - - - - - - - Production Verification Testing - - 157.233 - - 5.030 - - - - - - - - - - - - First Destination Transportation - - 10.064 - - 1.012 - - - - - - - - - - - - Production Engineering Support - - 269.274 - - 11.335 - - - - - - - - - - - - Spares - - 2.912 - - - - - - - - - - - - - - - PY Advance Procurement - - - - - - - - 30.000 - - - - - - - - - Summary LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 26 of 29 P-1 Line #14 Volume 1 - 176 === page 207 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C65404 / GUIDED MLRS ROCKET (GMLRS) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Qty ($ K) Subtotal: Recurring Cost FY 2025 Total Cost (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - 12,277.047 - - 1,120.813 - - 30.000 - - - - - - - - - - - 12,277.047 - - 1,120.813 - - 30.000 - - - - - - - - - Software Support - - 18.556 - - 12.334 - - - - - - - - - - - - Subtotal: Recurring Cost - - 18.556 - - 12.334 - - - - - - - - - - - - - - 18.556 - - 12.334 - - - - - - - - - - - - - - 308.160 - - 59.843 - - - - - - - - - - - - - - 308.160 - - 59.843 - - - - - - - - - - - - Subtotal: Flyaway Cost Software Cost Recurring Cost Subtotal: Software Cost Support - Engineering Change Proposals Cost Engineering Change Proposals Subtotal: Support Engineering Change Proposals Cost Support - Program Management Cost Government Management - - 121.262 - - 6.187 - - - - - - - - - - - - Subtotal: Support - Program Management Cost - - 121.262 - - 6.187 - - - - - - - - - - - - Gross/Weapon System Cost - - 12,725.025 - - 1,199.177 - - 30.000 - - - - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Element Breakout Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) GMLRS Rocket Summary - - Standard Range GMLRS Unitary - - Standard Range GMLRS AW - - Extended Range GMLRS Unitary - - ($ K) 2,948.688 Qty (Each) FY 2026 Total Cost ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) 190.508 5,076 967.020 - - - - - - - - - - - - 143.151 3,534 505.896 - - - - - - - - - - - - 2,877.595 172.185 1,032 177.695 - - - - - - - - - - - - 71.093 555.743 510 283.429 - - - - - - - - - - - - - Remarks: In FY 2026 the Army established separate funding for each GMLRS and ER-GMLRS variant. The Advance Procurement requested in FY 2025 is accounted for in FY 2026 on the C65404 PE, but benefits production on the separately funded PEs for each variant. LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 27 of 29 P-1 Line #14 Volume 1 - 177 === page 208 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C65404 / GUIDED MLRS ROCKET (GMLRS) MDAP/MAIS Code: Production Support activities include industrial engineering services, bunker storage, property management/repair of government furnished equipment, and production and quality personnel in support of manufacturing efforts. Engineering Change Proposals cover activities associated with resolving manufacturing-related changes that arise due to emerging statutory and regulatory requirements, supply chain disruptions, obsolescence, process enhancements and quality improvements. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 1,198.264 1,198.264 FY 2027 OOC FY 2027 Total - - - - - - - - - - - - 0.000 - - - indicates the presence of a P-5a LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 28 of 29 P-1 Line #14 Volume 1 - 178 === page 209 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements Tactical GMLRS Hardware Tactical GMLRS Hardware GMLRS Rocket Summary O O C P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: C65404 / GUIDED MLRS ROCKET (GMLRS) Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty RFP Issue Date FY Contractor and Location 2022 Lockheed Martin M.&F.C Sys. / Dallas, TX SS / FFP Aviation and Missile Command Mar 2022 Aug 2023 6,804 148.894 Y May 2019 2023 Lockheed Martin M.&F.C Sys. / Dallas, TX SS / FFP Aviation and Missile Command Mar 2023 Aug 2024 0 0.000 Y Feb 2022 2025 Lockheed Martin M.&F.C Sys. / Dallas, TX SS / FFP Aviation and Missile Command Mar 2025 Feb 2027 5,076 190.508 Y Feb 2022 (Each) Remarks: Lockheed Martin is currently the industry source that is both facilitized and qualified to produce the GMLRS rocket. Procurement quantities refer to the number of individual rockets. Acronyms: SS (Sole Source) / FPIF (Fixed Price Incentive Firm) SS (Sole Source) / FFP (Firm Fixed Price) LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 29 of 29 P-1 Line #14 Volume 1 - 179 === page 210 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 30: Anti-Tank/ Assault Missile Sys P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Program Elements for Code B Items: N/A Other Related Program Elements: 0603778A, 0205778A Line Item MDAP/MAIS Code: 260 Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Gross/Weapon System Cost ($ in Millions) 30.913 30.000 43.156 49.106 - 49.106 46.107 45.470 51.694 - Continuing Continuing Net Procurement (P-1) ($ in Millions) 30.913 30.000 43.156 49.106 - 49.106 46.107 45.470 51.694 - Continuing Continuing Total Obligation Authority ($ in Millions) 30.913 30.000 43.156 49.106 - 49.106 46.107 45.470 51.694 - Continuing Continuing Description: Guided Multiple Launch Rocket System (GMLRS) rockets are surface-to-surface artillery rockets fired from the Multiple Launch Rocket System (MLRS) and High Mobility Artillery Rocket System (HIMARS) launchers. GMLRS rockets provide 24/7, all-weather precision fires to engage both area and point targets at short, medium, and long ranges. The U.S. Marine Corps also procures GMLRS rockets through the Army project office. LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 1 of 10 P-1 Line #15 Volume 1 - 180 === page 211 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 30: Anti-Tank/ Assault Missile Sys P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Program Elements for Code B Items: N/A Other Related Program Elements: 0603778A, 0205778A Line Item MDAP/MAIS Code: 260 Exhibits Schedule Exhibit Type Title* ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-10 C64417 / EXTENDED RANGE GMLRS ALTERNATIVE WARHEAD (ERG-AW) - / - - / - / 2.114 300 / 4.589 - / - 300 / 4.589 P-10 C64418 / GMLRS ALTERNATIVE WARHEAD (GMLRS-AW) - / - - / - 2,640 / 14.588 1,596 / 16.173 - / - 1,596 / 16.173 P-10 C64419 / GMLRS UNITARY (GMLRS-U) / - 2,640 / 26.454 2,928 / 28.344 2,928 / 28.344 P-10 C65404 / GUIDED MLRS ROCKET (GMLRS) - / 30.913 - / 30.000 P-40 Total Gross/Weapon System Cost - / 30.913 - / 30.000 - / - - - - - / - / - - / - 4,824 / 49.106 - / - / - 5,490 / 43.156 - - / - 4,824 / 49.106 *Title represents the P-10 Title for Advance Procurement. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Advance Procurement dollars in the amount of $49.106 million support the procurement of long lead items for GMLRS rockets in FY 2028. Advance Procurement dollars are required to reduce production lead time of standard range GMLRS and ER-GMLRS from 36 months to 24 months. Advance Procurement is required annually to maintain a 24-month lead time. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 2 of 10 P-1 Line #15 Volume 1 - 181 === page 212 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Army P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 First System (2027) Award Date: March 2026 First System (2027) Completion Date: March 2028 EXTENDED RANGE GMLRS ALTERNATIVE WARHEAD (ERG-AW) Production Leadtime FY 2025 (Each) Quantity When Required Prior Years (Months) FY 2026 (Each) Cost Elements P-5 Number / Title: C64417 / EXTENDED RANGE GMLRS ALTERNATIVE WARHEAD (ERG-AW) Interval Between Systems: Months Prior Years (Months) Date: April 2026 FY 2025 ($ M) FY 2027 (Each) (Each) FY 2026 ($ M) 300 FY 2027 ($ M) ($ M) CFE IMPS Motor LL Items - - - 1.615 3.506 Guidance Set LL Items - - - 0.001 0.002 Payload Electronics LL Items - - - 0.214 0.464 Control Actuation System LL Items - - - 0.284 0.617 Total: CFE - - 2.114 4.589 Total Advance Procurement/Obligation Authority - - 2.114 4.589 LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 3 of 10 P-1 Line #15 Volume 1 - 182 === page 213 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Date: April 2026 P-5 Number / Title: C64417 / EXTENDED RANGE GMLRS ALTERNATIVE WARHEAD (ERG-AW) FY 2027 Cost Elements Production Leadtime QPA (Months) (Each) Unit Cost ($ K) Contract Forecast Date 2027 Qty (Each) For FY Total Cost Request ($ M) CFE IMPS Motor LL Items 1 2028 3.506 Guidance Set LL Items 1 2028 0.002 Payload Electronics LL Items 1 2028 0.464 Control Actuation System LL Items 1 2028 0.617 Total: CFE 4.589 Total Advance Procurement/Obligation Authority 4.589 Description: Advance Procurement funding in FY 2027 procures long lead (LL) items to support the GMLRS FY 2028 Production Lot and reduces production lead time of ER GMLRS from 36 months to 24 months and mitigates supply chain volatility. LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 4 of 10 P-1 Line #15 Volume 1 - 183 === page 214 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Army P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 First System (2027) Award Date: March 2026 First System (2027) Completion Date: March 2028 GMLRS ALTERNATIVE WARHEAD (GMLRS-AW) Production Leadtime FY 2025 (Each) Quantity When Required Prior Years (Months) FY 2026 (Each) Cost Elements P-5 Number / Title: C64418 / GMLRS ALTERNATIVE WARHEAD (GMLRS-AW) Interval Between Systems: Months Prior Years (Months) Date: April 2026 FY 2025 ($ M) FY 2027 (Each) (Each) 2,640 FY 2026 ($ M) 1,596 FY 2027 ($ M) ($ M) CFE IMPS Motor LL Items - - - 11.599 12.860 Guidance Set LL Items - - - 0.004 0.003 Payload Electronics LL Items - - - 1.793 1.987 Control Actuation System LL Items - - - 1.192 1.323 Total: CFE - - 14.588 16.173 Total Advance Procurement/Obligation Authority - - 14.588 16.173 LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 5 of 10 P-1 Line #15 Volume 1 - 184 === page 215 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Date: April 2026 P-5 Number / Title: C64418 / GMLRS ALTERNATIVE WARHEAD (GMLRS-AW) FY 2027 Cost Elements Production Leadtime QPA (Months) (Each) Unit Cost ($ K) Contract Forecast Date 2027 Qty (Each) For FY Total Cost Request ($ M) CFE IMPS Motor LL Items 1 2028 12.860 Guidance Set LL Items 1 2028 0.003 Payload Electronics LL Items 1 2028 1.987 Control Actuation System LL Items 1 2028 1.323 Total: CFE 16.173 Total Advance Procurement/Obligation Authority 16.173 Description: Advance Procurement funding in FY 2027 procures long lead (LL) items to support the GMLRS FY 2028 Production Lot and reduces production lead time of GMLRS from 36 months to 24 months and mitigates supply chain volatility. LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 6 of 10 P-1 Line #15 Volume 1 - 185 === page 216 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Army P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 First System (2027) Award Date: March 2026 First System (2027) Completion Date: March 2028 GMLRS UNITARY (GMLRS-U) Production Leadtime FY 2025 (Each) Quantity When Required Prior Years (Months) FY 2026 (Each) Cost Elements P-5 Number / Title: C64419 / GMLRS UNITARY (GMLRS-U) Interval Between Systems: Months Prior Years (Months) Date: April 2026 FY 2025 ($ M) FY 2027 (Each) (Each) 2,640 FY 2026 ($ M) 2,928 FY 2027 ($ M) ($ M) CFE IMPS Motor LL Items - - - 21.034 22.538 Guidance Set LL Items - - - 0.006 0.005 Payload Electronics Items - - - 3.252 3.483 Control Actuation System Items - - - 2.162 2.318 Total: CFE - - 26.454 28.344 Total Advance Procurement/Obligation Authority - - 26.454 28.344 LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 7 of 10 P-1 Line #15 Volume 1 - 186 === page 217 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Date: April 2026 P-5 Number / Title: C64419 / GMLRS UNITARY (GMLRS-U) FY 2027 Cost Elements Production Leadtime QPA (Months) (Each) Unit Cost ($ K) Contract Forecast Date 2027 Qty (Each) For FY Total Cost Request ($ M) CFE IMPS Motor LL Items 1 2028 22.538 Guidance Set LL Items 1 2028 0.005 Payload Electronics Items 1 2028 3.483 Control Actuation System Items 1 2028 2.318 Total: CFE 28.344 Total Advance Procurement/Obligation Authority 28.344 Description: Advance Procurement funding in FY 2027 procures long lead (LL) items to support the GMLRS FY 2028 Production Lot and reduces production lead time of GMLRS from 36 months to 24 months and mitigates supply chain volatility. LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 8 of 10 P-1 Line #15 Volume 1 - 187 === page 218 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Army P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 First System (2027) Award Date: March 2024 First System (2027) Completion Date: August 2025 GUIDED MLRS ROCKET (GMLRS) Production Leadtime FY 2025 (Each) When Required Prior Years (Months) FY 2026 (Each) Quantity Cost Elements P-5 Number / Title: C65404 / GUIDED MLRS ROCKET (GMLRS) Interval Between Systems: Months Prior Years (Months) Date: April 2026 FY 2025 ($ M) FY 2027 (Each) (Each) FY 2026 ($ M) FY 2027 ($ M) ($ M) CFE IMPS Motor LL Items - 24.502 23.840 - - Guidance Set LL Items - 0.008 0.007 - - Payload Electronics LL Items - 3.745 3.679 - - Control Actuation System LL Items - 2.658 2.474 - - Total: CFE 30.913 30.000 - - Total Advance Procurement/Obligation Authority 30.913 30.000 - - LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 9 of 10 P-1 Line #15 Volume 1 - 188 === page 219 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 P-1 Line Item Number / Title: 6005C64400 / Guided MLRS Rocket (GMLRS) Date: April 2026 P-5 Number / Title: C65404 / GUIDED MLRS ROCKET (GMLRS) FY 2027 Cost Elements Production Leadtime QPA (Months) (Each) Unit Cost ($ K) Contract Forecast Date 2027 Qty (Each) For FY Total Cost Request ($ M) CFE IMPS Motor LL Items 1 - Guidance Set LL Items 1 - Payload Electronics LL Items 1 - Control Actuation System LL Items 1 - Total: CFE - Total Advance Procurement/Obligation Authority - Description: Advance Procurement for FY 2027 will be accounted for on the P-10s for each GMLRS variant. LI 6005C64400 - Guided MLRS Rocket (GMLRS) Army UNCLASSIFIED Page 10 of 10 P-1 Line #15 Volume 1 - 189 === page 220 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 6060C65405 / MLRS Reduced Range Practice Rockets (RRPR) Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 30: Anti-Tank/ Assault Missile Sys Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0210602A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Procurement Quantity (Units in Each) 62,115 3,720 4,002 600 - 600 3,846 3,792 - - Continuing Gross/Weapon System Cost ($ in Millions) 405.981 30.230 32.339 7.412 - 7.412 32.579 32.869 - - Continuing - - - - - - - - - 30.230 32.339 7.412 - 7.412 32.579 32.869 - - Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 405.981 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 405.981 Total Continuing Continuing Continuing Continuing - - - - - - - - - - - 30.230 32.339 7.412 - 7.412 32.579 32.869 - - Continuing Continuing - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - 6.536 8.126 8.081 12.353 - 12.353 8.471 8.668 - - Gross/Weapon System Unit Cost ($ in Thousands) Continuing Continuing Description: The Multiple Launch Rocket System (MLRS) Low Cost Reduced Range Practice Rocket (LCRRPR) is the only live training rocket that meets the annual qualification and pre-deployment requirements for Active and National Guard High Mobility Artillery Rocket System (HIMARS) and M270/M270A1 MLRS launcher units. The critical validated requirement for launcher units ensures units can achieve and maintain combat readiness. HIMARS and M270A1 Battalions are organic and attached to modular Fires Brigades supporting Brigade Combat Teams (BCTs), Joint Expeditionary Force, and Joint Special Operations Force combatant commanders. The training rocket has an inert payload section and blunt nose for inducing reduced range for use at multiple facilities in the United States and foreign countries. Capabilities exist to produce LCRRPRs at both Lockheed Martin in Camden, Arkansas and Letterkenny Munitions Center (LEMC) in Chambersburg, Pennsylvania production facilities. Total cost also includes bunker storage and the procurement of performance-oriented packaging (POP) boxes, inert warheads, reworked igniters, procurement or repair of launch pod containers (LPCs), download, demate, and inspection of M-26 rocket motors, and obsolescence. Secondary Distribution Army ANG Total: Secondary Distribution FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 Quantity 2,838 3,126 468 - 468 3,012 2,976 - - Total Obligation Authority 23.042 25.282 5.805 - 5.805 25.515 25.805 - - 882 876 132 - 132 834 816 - - Total Obligation Authority 7.188 7.057 1.607 - 1.607 7.064 7.064 - - Quantity 3,720 4,002 600 - 600 3,846 3,792 - - Total Obligation Authority 30.230 32.339 7.412 - 7.412 32.579 32.869 - - Quantity LI 6060C65405 - MLRS Reduced Range Practice Rockets (RRP... Army UNCLASSIFIED Page 1 of 5 P-1 Line #16 Volume 1 - 190 === page 221 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 30: Anti-Tank/ Assault Missile Sys P-1 Line Item Number / Title: 6060C65405 / MLRS Reduced Range Practice Rockets (RRPR) Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0210602A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 C65405 / MLRS Reduced Range Practice Rockets (RRPR) P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code P-5a Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 62,115 / 405.981 3,720 / 30.230 4,002 / 32.339 600 / 7.412 - / - 600 / 7.412 62,115 / 405.981 3,720 / 30.230 4,002 / 32.339 600 / 7.412 - / - 600 / 7.412 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Base procurement dollars in the amount of $7.412 million supports the procurement of 600 LCRRPRs which are required to maintain the practice rocket inventory to meet annual qualification and predeployment requirements for Active and National Guard High Mobility Artillery Rocket System (HIMARS) and M270/M270A1 MLRS launcher units. The Army intends to convert any price advantage created through contract negotiations, other service procurement, and/or foreign military sales to support procurement of additional LCRRPR rockets. Funding decreased in FY 2027 due to a decrease in quantities to be procured. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 6060C65405 - MLRS Reduced Range Practice Rockets (RRP... Army UNCLASSIFIED Page 2 of 5 P-1 Line #16 Volume 1 - 191 === page 222 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6060C65405 / MLRS Reduced Range Practice Rockets (RRPR) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C65405 / MLRS Reduced Range Practice Rockets (RRPR) MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) 62,115 3,720 4,002 600 - 600 Gross/Weapon System Cost ($ in Millions) 405.981 30.230 32.339 7.412 - 7.412 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 405.981 Plus CY Advance Procurement ($ in Millions) - - - - - 30.230 32.339 7.412 - 7.412 - Total Obligation Authority ($ in Millions) 405.981 - - - - - 30.230 32.339 7.412 - 7.412 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - 6.536 8.126 8.081 12.353 - 12.353 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years FY 2025 FY 2026 61,563 324.044 6.392 3,720 23.779 6.375 4,002 25.511 6.785 600 4.071 - - - 6.785 600 4.071 Warheads Govt Furnished Equip (GFE) - - 30.692 - - 3.119 - - 3.404 - - 0.521 - - - - - 0.521 Production Verification Testing - - 4.470 - - 0.244 - - 0.249 - - 0.254 - - - - - 0.254 First Destination Transportation - - 2.147 - - 0.316 - - 0.323 - - 0.038 - - - - - 0.038 Production Engineering Support - - 24.236 - - 2.045 - - 2.110 - - 1.770 - - - - - 1.770 Subtotal: Recurring Cost - - 385.589 - - 29.503 - - 31.597 - - 6.654 - - - - - 6.654 - - 385.589 - - 29.503 - - 31.597 - - 6.654 - - - - - 6.654 Production Engineering - - 8.478 - - 0.616 - - 0.629 - - 0.642 - - - - - 0.642 Subtotal: Support Production Engineering Cost - - 8.478 - - 0.616 - - 0.629 - - 0.642 - - - - - 0.642 - - 11.915 - - 0.111 - - 0.113 - - 0.116 - - - - - 0.116 ($ K) (Each) ($ M) ($ K) Qty (Each) ($ M) Unit Cost ($ K) Qty (Each) ($ M) Unit Cost ($ K) Total Cost FY 2027 Total 5.264 Cost Elements Unit Cost Total Cost FY 2027 OOC Qty Unit Cost Total Cost FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost Reduced Range Practice Rocket (†) (LCRRPR) Subtotal: Flyaway Cost Support - Production Engineering Cost Support - Program Management Cost Government Management LI 6060C65405 - MLRS Reduced Range Practice Rockets (RRP... Army UNCLASSIFIED Page 3 of 5 P-1 Line #16 Volume 1 - 192 === page 223 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6060C65405 / MLRS Reduced Range Practice Rockets (RRPR) Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C65405 / MLRS Reduced Range Practice Rockets (RRPR) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Subtotal: Support - Program Management Cost Gross/Weapon System Cost Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) ($ K) Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - 11.915 - - 0.111 - - 0.113 - - 0.116 - - - - - 0.116 6.536 62,115 405.981 8.126 3,720 30.230 8.081 4,002 32.339 12.353 600 7.412 - - - 12.353 600 7.412 Secondary Distribution Army ANG FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total 2,838 3,126 468 - 468 Total Obligation Authority 23.042 25.282 5.805 - 5.805 Quantity Total: Secondary Distribution FY 2025 Quantity Total Obligation Authority (†) Unit Cost FY 2027 Base Total Cost 882 876 132 - 132 7.188 7.057 1.607 - 1.607 Quantity 3,720 4,002 600 - 600 Total Obligation Authority 30.230 32.339 7.412 - 7.412 indicates the presence of a P-5a LI 6060C65405 - MLRS Reduced Range Practice Rockets (RRP... Army UNCLASSIFIED Page 4 of 5 P-1 Line #16 Volume 1 - 193 === page 224 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: C65405 / MLRS Reduced Range Practice Rockets (RRPR) FY Contractor and Location Method/Type or Funding Vehicle Reduced Range Practice Rocket (LCRRPR) 2022 Lockheed Martin / Dallas, TX SS / IDIQ AMCOM, RSA, AL Mar 2022 Aug 2023 1,680 9.430 Y Reduced Range Practice Rocket (LCRRPR) 2023 Lockheed Martin / Dallas, TX SS / IDIQ AMCOM, RSA, AL Mar 2023 Aug 2024 228 7.623 Y Reduced Range Practice Rocket (LCRRPR) 2024 Lockheed Martin / Dallas, TX SS / IDIQ AMCOM, RSA, AL Mar 2024 Oct 2025 366 15.428 Y Reduced Range Practice Rocket (LCRRPR) 2024 Letterkenny Munitions Center / Chambersburg, PA MIPR LEMC, PA Mar 2024 Apr 2025 150 6.429 Y Reduced Range Practice Rocket (LCRRPR) 2025 Letterkenny Munitions Center / Chambersburg, PA MIPR LEMC, PA Mar 2025 Mar 2026 3,720 6.392 Y Reduced Range Practice Rocket (LCRRPR) 2026 Letterkenny Munitions Center / Chambersburg, PA MIPR LEMC, PA Jan 2026 Oct 2027 4,002 6.375 Y Reduced Range Practice Rocket (LCRRPR) 2027 Letterkenny Munitions Center / Chambersburg, PA MIPR LEMC, PA Jan 2027 Feb 2029 600 6.785 Y Cost Elements O O C P-1 Line Item Number / Title: 6060C65405 / MLRS Reduced Range Practice Rockets (RRPR) Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($ K) RFP Issue Date Feb 2020 Remarks: U.S. Army is prioritizing RRPR production at Letterkenny Munitions Center (organic source). Lockheed Martin serves as a secondary source if required. Acronyms: SS (Sole Source) / FPIF (Fixed Price Incentive Firm) SS (Sole Source) / IDIQ (Indefinite Delivery Indefinite Quantity) MIPR (Military Interdepartmental Purchase Request) AMCOM (Aviation and Missile Command), RSA (Redstone Arsenal), AL LEMC (Letterkenny Munitions Center) LI 6060C65405 - MLRS Reduced Range Practice Rockets (RRP... Army UNCLASSIFIED Page 5 of 5 P-1 Line #16 Volume 1 - 194 === page 225 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 6200C02901 / High Mobility Artillery Rocket System (HIMARS) Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 30: Anti-Tank/ Assault Missile Sys Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0210608A, 0603778A Line Item MDAP/MAIS Code: 367 Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 To FY 2031 Complete FY 2030 18 6 96 - 96 12 4 4 3,386.680 175.539 61.503 745.682 - 745.682 142.607 31.891 34.488 3,386.680 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2026 575 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2025 3,386.680 - - 175.539 - 61.503 - - 175.539 - 745.682 - 61.503 - - 745.682 - 745.682 - - 745.682 142.607 142.607 Total - - 715 0.809 - 4,579.199 - - - - 31.891 34.488 0.809 - - - - - 31.891 34.488 0.809 - 4,579.199 4,579.199 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 5,889.878 9,752.167 10,250.500 7,767.521 - 7,767.521 11,883.917 7,972.750 8,622.000 6,404.474 Description: The M142 High Mobility Artillery Rocket System (M142 HIMARS) launcher is a full spectrum, combat proven, all weather, 24/7 lethal and responsive, precision strike weapon system. M142 HIMARS launchers support the Army's Long Range Precision Fires modernization effort. M142 HIMARS provides critical missile precision strike, operational shaping fires, counterfire, and close support destructive and suppressive fires. M142 HIMARS is a C-130 or C-17 transportable, wheeled, indirect fire, rocket/missile launcher capable of firing one pod of precision rockets/missiles from the current Multiple Launch Rocket System (MLRS) Family of Munitions (MFOM) including the Guided Multiple Launch Rocket System (GMLRS) and the Army Tactical Missile System (ATACMS), the Precision Strike Missile (PrSM), and future MFOM to include the Extended Range GMLRS (ER-GMLRS). M142 HIMARS launchers support Integrated Fires and Multi-Domain Operations. The Army Acquisition Objective (AAO) is 617. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 18 6 96 - 96 12 4 4 175.539 61.503 745.682 - 745.682 142.607 31.891 34.488 18 6 96 - 96 12 4 4 175.539 61.503 745.682 - 745.682 142.607 31.891 34.488 LI 6200C02901 - High Mobility Artillery Rocket System (H... Army UNCLASSIFIED Page 1 of 12 P-1 Line #17 0.809 0.809 Volume 1 - 195 === page 226 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 30: Anti-Tank/ Assault Missile Sys P-1 Line Item Number / Title: 6200C02901 / High Mobility Artillery Rocket System (HIMARS) Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0210608A, 0603778A Line Item MDAP/MAIS Code: 367 Exhibits Schedule Exhibit Type Title* P-5 C03000 / HIMARS LAUNCHER P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 575 / 3,386.680 18 / 175.539 6 / 61.503 96 / 745.682 - / - 96 / 745.682 575 / 3,386.680 18 / 175.539 6 / 61.503 96 / 745.682 - / - 96 / 745.682 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Base procurement dollars in the amount of $745.682 million procures 96 M142 HIMARS launchers and associated equipment. The synergy of foreign military sales and the increased production capacity contribute to a decreased launcher unit cost from $10.250 million in FY 2026 to $7.767 million in FY 2027. The Army intends to procure additional M142 HIMARS launchers in direct support to ongoing Fleet Expansion associated with Army transformation. M142 HIMARS funding increases from FY 2026 to FY 2027 and procures 96 additional M142 HIMARS launchers. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 6200C02901 - High Mobility Artillery Rocket System (H... Army UNCLASSIFIED Page 2 of 12 P-1 Line #17 Volume 1 - 196 === page 227 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: Item Number / Title [DODIC]: 6200C02901 / High Mobility Artillery Rocket System (HIMARS) C03000 / HIMARS LAUNCHER Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2026 FY 2027 Total 6 96 - 96 3,386.680 175.539 61.503 745.682 - 745.682 - - 3,386.680 Plus CY Advance Procurement ($ in Millions) - 175.539 - Total Obligation Authority ($ in Millions) FY 2027 OOC 18 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2027 Base 575 - 3,386.680 - 61.503 - 175.539 - 745.682 - 61.503 - - 745.682 - 745.682 - - 745.682 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 5,889.878 - 9,752.167 - 10,250.500 - 7,767.521 - - 7,767.521 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) Qty (Each) FY 2025 Total Cost Unit Cost 6,965.610 ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost (†) Launcher 4,211.735 574 2,417.536 Carrier 8,494.792 24 203.875 - - Production Facilitization 18 125.381 5,751.500 6 - - - - - 34.509 5,902.000 96 - - - - - - - - 34.509 - - 566.592 - - - - - - - 5,902.000 - - 96 - - - - - - - - - - - 566.592 - - - 29.300 - - - - 2,650.711 - - European Deterrence Initiative Production Restart - Obsolescence Mitigation - - 74.400 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 74.400 - - - - - - - - - - - - - - - - - 2,725.111 - - - - 34.509 - - 566.592 - - - - - 566.592 Spares Procurement - - - - - - - - 12.718 - - 59.769 - - - - - 59.769 Subtotal: Recurring Cost - - - - - - - - 12.718 - - 59.769 - - - - - 59.769 Spares Replacement - - 63.076 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 63.076 - - - - - - - - - - - - - - - Subtotal: Recurring Cost 125.381 566.592 566.592 Non Recurring Cost Subtotal: Flyaway Cost 125.381 Hardware Cost Recurring Cost Non Recurring Cost LI 6200C02901 - High Mobility Artillery Rocket System (H... Army UNCLASSIFIED Page 3 of 12 P-1 Line #17 Volume 1 - 197 === page 228 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: Item Number / Title [DODIC]: 6200C02901 / High Mobility Artillery Rocket System (HIMARS) C03000 / HIMARS LAUNCHER Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) Subtotal: Hardware Cost FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - 63.076 - - - - - 12.718 - - 59.769 - - - - - 59.769 - - 119.643 - - 24.374 - - 1.252 - - 40.044 - - - - - 40.044 - - 119.643 - - 24.374 - - 1.252 - - 40.044 - - - - - 40.044 - - 26.154 - - - - - - - - - - - - - - - - - 26.154 - - - - - - - - - - - - - - - Support - Fielding Cost Fielding Subtotal: Support - Fielding Cost Support - Operational/Site Activation Cost System Assembly, Installation and Checkout on Site Subtotal: Support Operational/Site Activation Cost Support - Peculiar Support Equipment Cost Support and Handling Equipment - - 65.320 - - 4.688 - - 2.653 - - 21.667 - - - - - 21.667 Subtotal: Support - Peculiar Support Equipment Cost - - 65.320 - - 4.688 - - 2.653 - - 21.667 - - - - - 21.667 Production Engineering - - 187.360 - - 11.944 - - 6.323 - - 46.963 - - - - - 46.963 Subtotal: Support Production Engineering Cost - - 187.360 - - 11.944 - - 6.323 - - 46.963 - - - - - 46.963 - - 34.562 - - 3.575 - - 3.651 - - 3.726 - - - - - 3.726 - - 34.562 - - 3.575 - - 3.651 - - 3.726 - - - - - 3.726 System Engineering - - 118.956 - - - - - - - - - - - - - - - Subtotal: Support - System Engineering Cost - - 118.956 - - - - - - - - - - - - - - - Support - Production Engineering Cost Support - Program Management Cost Government Management Subtotal: Support - Program Management Cost Support - System Engineering Cost Support - System Test and Evaluation Cost Test and Evaluation Support - - 34.655 - - 4.405 - - - - - - - - - - - - Subtotal: Support - System Test and Evaluation Cost - - 34.655 - - 4.405 - - - - - - - - - - - - - - 11.843 - - 1.172 - - 0.397 - - 6.921 - - - - - 6.921 - - 11.843 - - 1.172 - - 0.397 - - 6.921 - - - - - 6.921 Support - Training Cost Services Subtotal: Support - Training Cost LI 6200C02901 - High Mobility Artillery Rocket System (H... Army UNCLASSIFIED Page 4 of 12 P-1 Line #17 Volume 1 - 198 === page 229 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: Item Number / Title [DODIC]: 6200C02901 / High Mobility Artillery Rocket System (HIMARS) C03000 / HIMARS LAUNCHER Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Gross/Weapon System Cost Unit Cost ($ K) 5,889.878 Qty (Each) 575 FY 2025 Total Cost Unit Cost 3,386.680 9,752.167 ($ M) ($ K) Qty (Each) FY 2026 Total Cost Unit Cost 175.539 10,250.500 ($ M) 18 ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) 6 61.503 Unit Cost ($ K) Qty (Each) 7,767.521 FY 2027 OOC Total Cost ($ M) 96 Unit Cost 745.682 ($ K) - FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) - ($ K) - 7,767.521 Total Cost Qty (Each) ($ M) 96 745.682 Remarks: M142 HIMARS funding increases from FY2026 to FY2027 and procures a total of 96 systems; directly impacting the multiple cost elements associated with procurement. To provide budget transparency, the Army separated the spares procurement cost element from the fielding cost element. This is to focus on spares procurement for past and current fieldings. Spares procurement for FY2027 totals $59.769 million, representing a $47.051 million increase from FY2026 and the FY 2027 Fielding cost element increased by $38.792 million to $40.044 million from the FY2026 total of $1.252 million. The increase in Spares procurement and fielding costs are driven by the fielding schedule for FY2027 in comparison to the previous fiscal year as well as the significant increase to procured systems. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total 18 6 96 - 96 175.539 61.503 745.682 - 745.682 18 6 96 - 96 175.539 61.503 745.682 - 745.682 indicates the presence of a P-5a LI 6200C02901 - High Mobility Artillery Rocket System (H... Army UNCLASSIFIED Page 5 of 12 P-1 Line #17 Volume 1 - 199 === page 230 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (†) Launcher (†) Launcher (†) Launcher (†) Launcher (†) Launcher (†) Launcher (†) O O C P-1 Line Item Number / Title: Item Number / Title [DODIC]: 6200C02901 / High Mobility Artillery Rocket System (HIMARS) C03000 / HIMARS LAUNCHER Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty RFP Issue Date FY Contractor and Location 2022 Lockheed Martin M. F. C. Sys / Dallas Texas SS / FFP Aviation & Missile Command Apr 2022 Jun 2024 56 7,302.871 N Jan 2021 2023 Lockheed Martin M. F. C. Sys / Dallas Texas SS / FPIF Aviation & Missile Command Apr 2023 Oct 2025 83 6,587.962 N Jan 2021 2024 Lockheed Martin M. F. C. Sys / Dallas Texas SS / FPIF Aviation & Missile Command Apr 2024 Dec 2026 21 7,682.667 N Jan 2023 2025 Lockheed Martin M. F. C. Sys / Dallas Texas SS / FPIF Aviation & Missile Command Apr 2025 Jul 2027 18 6,965.610 N Jul 2024 2026 Lockheed Martin M. F. C. Sys / Dallas Texas SS / FPIF Aviation & Missile Command Apr 2026 Jun 2028 6 5,751.500 N Jul 2025 2027 Lockheed Martin M. F. C. Sys / Dallas Texas SS / FPIF Aviation & Missile Command Apr 2027 Apr 2029 96 5,902.000 N Aug 2025 (Each) indicates the presence of a P-21 LI 6200C02901 - High Mobility Artillery Rocket System (H... Army UNCLASSIFIED Page 6 of 12 P-1 Line #17 Volume 1 - 200 === page 231 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: Item Number / Title [DODIC]: 6200C02901 / High Mobility Artillery Rocket System (HIMARS) C03000 / HIMARS LAUNCHER Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Launcher Prior Years Deliveries: 414 1 2022 ARMY 56 0 56 - - - - - - 56 1 2023 ARMY 83 0 83 A - - - - - - - - - - - - A - - - - - - 83 1 2023 FMS (‡) 38 0 38 A - - - - - - 38 1 2023 Total 121 0 121 - - - - - - 121 1 2024 ARMY 21 0 21 21 1 2024 FMS (‡) 31 0 31 31 1 2024 Total 52 0 52 52 1 2025 ARMY 18 0 18 18 1 2025 FMS (‡) 52 0 52 52 1 2025 Total 70 0 70 70 1 2026 ARMY 6 0 6 6 1 2026 FMS (‡) 68 0 68 68 1 2026 Total 74 0 74 74 1 2027 ARMY 96 0 96 96 O C T N O V D E C J A N LI 6200C02901 - High Mobility Artillery Rocket System (H... Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 201 === page 232 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: Item Number / Title [DODIC]: 6200C02901 / High Mobility Artillery Rocket System (HIMARS) C03000 / HIMARS LAUNCHER Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Launcher Prior Years Deliveries: 414 1 2022 ARMY 56 0 56 - - - - - - - - 1 2023 ARMY 83 0 83 - - - - - - - - - - - - - - - - - - - - - - - - 1 2023 FMS 1 2023 Total 1 2024 1 2024 FMS 1 2024 1 (‡) 5 5 5 5 5 5 4 - 6 6 6 4 0 83 38 0 38 - - - - - - - - - - - - - - - - - - - - - - - - 38 121 0 121 - - - - - - - - - - - - - - - - - - - - - - - - 121 ARMY 21 0 21 A - - - - - - - - - - - - - - - - - - 21 (‡) 31 0 31 A - - - - - - - - - - - - - - - - - - 31 Total 52 0 52 - - - - - - - - - - - - - - - - - - 52 2025 ARMY 18 0 18 A - - - - - - 18 1 2025 FMS (‡) 52 0 52 A - - - - - - 52 1 2025 Total 70 0 70 - - - - - - 70 1 2026 ARMY 6 0 6 6 1 2026 FMS (‡) 68 0 68 68 1 2026 Total 74 0 74 74 1 2027 ARMY 96 0 96 96 O C T N O V D E C J A N LI 6200C02901 - High Mobility Artillery Rocket System (H... Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 202 === page 233 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: Item Number / Title [DODIC]: 6200C02901 / High Mobility Artillery Rocket System (HIMARS) C03000 / HIMARS LAUNCHER Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Launcher Prior Years Deliveries: 414 1 2022 ARMY 56 56 0 1 2023 ARMY 83 0 83 0 1 2023 FMS (‡) 38 0 38 1 2023 Total 121 0 121 1 2024 ARMY 21 0 21 - - - - - - - - - - - - - - 1 2024 FMS (‡) 31 0 31 - - - - - - - - - - - - - - 1 2024 Total 52 0 52 - - - - - - - - - - - - - - 1 2025 ARMY 18 0 18 - - - - - - - - - - - - - - - - - - - - - 1 2025 FMS (‡) 52 0 52 - - - - - - - - - - - - - - - - - - - - - 1 2025 Total 70 0 70 - - - - - - - - - - - - - - - - - - - - - 1 2026 ARMY 6 0 6 A - - - - - - - - - - - - - - - - - - 6 1 2026 FMS (‡) 68 0 68 A - - - - - - - - - - - - - - - - - - 68 1 2026 Total 74 0 74 - - - - - - - - - - - - - - - - - - 74 1 2027 ARMY 96 0 96 A - - - - - - 96 8 8 - 8 O C T 8 - 8 N O V 8 - 8 D E C 7 8 J A N LI 6200C02901 - High Mobility Artillery Rocket System (H... Army F E B - - - - 3 1 8 8 8 8 5 8 8 8 8 8 8 M A R A P R M A Y J U N J U L 8 - 8 8 A U G UNCLASSIFIED Page 9 of 12 8 8 S E P 8 - 8 O C T 8 - 8 N O V 1 0 8 1 4 8 - - 1 8 J A N 8 4 D E C 0 - 8 F E B P-1 Line #17 M A R - - - - - - - 8 8 8 8 8 8 8 M A Y J U N - 0 0 7 A P R - 0 - 8 8 - 8 A U G 0 2 8 J U L - 0 52 2 52 S E P Volume 1 - 203 === page 234 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: Item Number / Title [DODIC]: 6200C02901 / High Mobility Artillery Rocket System (HIMARS) C03000 / HIMARS LAUNCHER Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Launcher Prior Years Deliveries: 414 1 2022 ARMY 56 56 0 0 1 2023 ARMY 83 83 0 0 1 2023 FMS (‡) 38 38 0 1 2023 Total 121 121 0 1 2024 ARMY 21 21 0 1 2024 FMS (‡) 31 31 0 1 2024 Total 52 52 0 - - - - - - - - - 1 2025 ARMY 18 18 0 - - - - - - - - - 1 2025 FMS (‡) 52 0 52 2 6 8 6 6 6 6 6 6 1 2025 Total 70 18 52 2 6 8 6 6 6 6 6 6 1 2026 ARMY 6 0 6 - - - - - - - - 1 2026 FMS (‡) 68 0 68 - - - - - - - - 1 2026 Total 74 0 74 - - - - - - - - 1 2027 ARMY 96 0 96 - - - - - - - - 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 O C T N O V D E C J A N LI 6200C02901 - High Mobility Artillery Rocket System (H... Army F E B M A R A P R M A Y - - - - - - - - - - - - - - 0 0 0 - 3 3 - - - - - - - - - - - - - - - - - - - 3 3 J U N - J U L 8 8 8 8 8 8 8 4 8 8 8 8 8 8 8 8 4 A U G UNCLASSIFIED S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R - - - 0 0 - 4 A P R - 0 8 - Page 10 of 12 - 8 M A Y 8 J U N 8 J U L 8 A U G 0 8 52 S E P Volume 1 - 204 === page 235 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: Item Number / Title [DODIC]: 6200C02901 / High Mobility Artillery Rocket System (HIMARS) C03000 / HIMARS LAUNCHER Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2031 M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Launcher Prior Years Deliveries: 414 1 2022 ARMY 56 56 0 0 1 2023 ARMY 83 83 0 0 1 2023 FMS (‡) 38 38 0 1 2023 Total 121 121 0 1 2024 ARMY 21 21 0 1 2024 FMS (‡) 31 31 0 1 2024 Total 52 52 0 1 2025 ARMY 18 18 0 1 2025 FMS (‡) 52 52 0 1 2025 Total 70 70 0 1 2026 ARMY 6 6 0 1 2026 FMS (‡) 68 68 0 1 2026 Total 74 74 0 1 2027 ARMY 96 44 52 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 - 8 O C T 8 N O V 8 D E C 8 J A N LI 6200C02901 - High Mobility Artillery Rocket System (H... Army 8 F E B 8 M A R - - - - - - - - - - - - - - - - - 4 A P R 0 0 M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 205 === page 236 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: Item Number / Title [DODIC]: 6200C02901 / High Mobility Artillery Rocket System (HIMARS) C03000 / HIMARS LAUNCHER Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Lockheed Martin M. F. C. Sys - Dallas Texas MSR For 2027 1-8-5 For 2027 MAX For 2027 24 96 96 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 6 24 Total After Oct 1 ALT Prior to Oct 1 30 ALT After Oct 1 0 Manufacturing PLT 6 Total After Oct 1 24 30 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 6200C02901 - High Mobility Artillery Rocket System (H... Army UNCLASSIFIED Page 12 of 12 P-1 Line #17 Volume 1 - 206 === page 237 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 6472C98510 / ARMY TACTICAL MSL SYS (ATACMS) - SYS SUM Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 30: Anti-Tank/ Assault Missile Sys Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0203802A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 1,575 1,589.328 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 1,589.328 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 1,589.328 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 1,575 - - - - - - - - - 1,702.608 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 113.280 113.280 113.280 To FY 2031 Complete Total 1,702.608 1,702.608 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 1,009.097 1,081.021 Description: Army Tactical Missile System (ATACMS) is the United States (U.S.) Army's primary 24/7, all weather, and surface-to-surface artillery precision missile used by current and future Combatant Commanders to shape the battlefield with long-range fires against hard and soft stationary targets in open, complex, and urban environments. The missile provides the Combatant Commanders with a 24/7 all-weather 300 kilometers (km) long-range fires capability to attack high-payoff, time-sensitive targets without placing aircraft and crews at risk. It's precision accuracy, along with the absence of potential duds and reduced lethal radii, mitigate the warfighter's collateral damage concerns against hard and soft targets in complex and urban environments. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 - 113.280 113.280 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Justification: There is no funding for FY 2027. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 6472C98510 - ARMY TACTICAL MSL SYS (ATACMS) - SYS SUM Army UNCLASSIFIED Page 1 of 1 P-1 Line #18 Volume 1 - 207 === page 238 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 6870C88001 / LETHAL MINIATURE AERIAL MISSILE SYSTEM (LMAMS) Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 30: Anti-Tank/ Assault Missile Sys Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0203802A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 500.477 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 500.477 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 500.477 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 163.744 163.744 163.744 To FY 2031 Complete Total 664.221 664.221 664.221 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Lethal Miniature Aerial Missile System (LMAMS) is a single man-portable/operable, light-weight organic, beyond line-of-sight, precision guided, loitering aerial missile system capable of locating and engaging obscured and/or fleeting enemy targets who otherwise cannot be engaged by typical direct fire weapon systems. Front and Side Look High Resolution Electro-Optical (day) and Front Look Infrared (night) cameras allow the Warfighter to have eyes on the target for positive identification. LMAMS Wave-Off capability allows the operator to wave-off or re-direct the LMAMS flight path prior to impact, if necessary. The system is comprised of a fire control unit, launcher, missile, and a modular payload capable of high lethality against unprotected Combatant Personnel and producing casualties against Personnel in Soft Skinned Vehicles. LMAMS has the ability to be employed in less than two minutes. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 - 163.744 163.744 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Justification: LMAMS has no FY 2027 funding. In accordance with Section 1815 of the FY08 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 6870C88001 - LETHAL MINIATURE AERIAL MISSILE SYSTEM (... Army UNCLASSIFIED Page 1 of 1 P-1 Line #19 Volume 1 - 208 === page 239 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 30: Anti-Tank/ Assault Missile Sys P-1 Line Item Number / Title: 6872C91500 / FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) - Gross/Weapon System Cost ($ in Millions) - Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) - Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) - FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - 103 147 - 147 257 369 327 305 - 1,508 67.816 139.191 - 139.191 217.480 360.870 326.506 327.941 - 1,785.295 345.491 345.491 345.491 67.816 67.816 - - 139.191 - - 139.191 - 139.191 139.191 217.480 217.480 360.870 360.870 326.506 326.506 To FY 2031 Complete 327.941 327.941 Total - 1,785.295 - 1,785.295 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - 658.408 946.878 - 946.878 846.226 977.967 998.489 1,075.216 - 1,183.883 Description: Family of Low Altitude Unmanned Systems (C91500) is a summary budget line containing a family of semi-autonomous (human-in-the-loop) unmanned aerial systems that improves the Infantry Brigade Combat Team (IBCT) lethality in terms of stand-off and destruction against dismounted formations, armored vehicles, and tanks. The project currently includes the following efforts: C91511 Long Range Precision Munition (LRPM) - Enduring is the lethal variant of the Launched Effects (LE) Family of Systems which provide a range of capabilities through variations of platforms, payloads, and mission systems. LE provides tactical and operational flexibility through collaboration of heterogeneous groups of LE launched from multiple domains (land and air) in conjunction with other manned platforms, C2, unmanned systems, and sensors throughout the operational environment. The ability to interoperate and coordinate with other LE systems at long ranges and adapt to changing threats is a core concept of the Launched Effects Abbreviated Capability Development Document validated in June 2024. Primary target set for LRPM is Integrated Air Defense Systems. LRPM will provide Army Aviation and Ground Forces with a precise long range munition system to rapidly respond in a combat environment to improve the lethality and stand-off of Warfighters and aviation platforms in an Anti-Access Area Denial (A2AD) and positioning, navigation, and timing (PNT) denied environment. C91521 (Low Altitude Stalking and Strike Ordnance (LASSO)) - Mobile Brigade Combat Teams (MBCTs) lack adequate proportional organic capabilities at echelon to apply immediate, point, long range, and direct fire effects to destroy tanks, light armored vehicles, hardened targets, defilade, and personnel targets, while producing minimal collateral damage in complex terrain in all environmental conditions. The LASSO is a day/night capable, lightweight, unmanned aerial anti-tank ordnance, man-portable weapon that consists of an All-Up Round (AUR) and Fire Control System (FCS). The AUR includes the launch/ delivery system and payload. The FCS consists of the Fire Control Unit (FCU), ground data link/terminal (GDT), and any other ancillary equipment. The LASSO range requirement is to fly less than or equal to 20km (straight line with auxiliary antenna) with a flight endurance that enables the Soldier to make multiple orbits within the IBCT typically assigned battlespace, to acquire and attack targets within and beyond current crew served and small arms fire. The range/endurance enables the unit to utilize reach back capability and maximize standoff. Unlike existing direct and indirect fire weapon systems, LASSO's discreet payload and unique capability delivers Soldiers the ability to abort against targets in a dynamic situation (e.g., use of human shields) or prosecute targets that would have been deemed non-viable in past due to the higher collateral damage associated with alternative munitions. The LASSO base capability will be optimized to defeat tanks rapidly and precisely for MBCTs. Follow on increments will support future capabilities for company and below echelons. Future increments will focus on additional range increases, enhanced lethality, and advanced payload options (personnel, hard sites, etc.). LASSO AAO: 1,675 FCUs LI 6872C91500 - FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS Army UNCLASSIFIED Page 1 of 14 P-1 Line #20 Volume 1 - 209 === page 240 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 6872C91500 / FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 30: Anti-Tank/ Assault Missile Sys Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Secondary Distribution Army Quantity Total Obligation Authority ANG Total: Secondary Distribution FY 2025 FY 2027 Base FY 2026 - 345.491 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 103 147 - 147 257 369 327 235 67.816 139.191 - 139.191 217.480 360.870 326.506 242.971 Quantity - - - - - - - - 70 Total Obligation Authority - - - - - - - - 84.970 103 147 - 147 257 369 327 305 67.816 139.191 - 139.191 217.480 360.870 326.506 327.941 Quantity Total Obligation Authority 345.491 LI 6872C91500 - FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS Army UNCLASSIFIED Page 2 of 14 P-1 Line #20 Volume 1 - 210 === page 241 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 02: Other Missiles / BSA 30: Anti-Tank/ Assault Missile Sys P-1 Line Item Number / Title: 6872C91500 / FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits P-5 C91511 / LRPM ENDURING P-5a, P-21 P-5 C91521 / LOW ALTITUDE STALKING AND STRIKE ORDNANCE (LASSO) P-5a, P-21 P-40 Total Gross/Weapon System Cost ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / - - / - - / 345.491 - / - - / 345.491 - / - 52 / 29.674 - / - 52 / 29.674 103 / 67.816 95 / 109.517 - / - 95 / 109.517 103 / 67.816 147 / 139.191 - / - 147 / 139.191 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: C91511 LRPM - Enduring transitions the LRPM Middle Tier of Acquisition - Rapid Prototyping (MTA-RP) effort in PE 0605345A/A56 to support delivery and fielding of LRPM AURs to Army formations. The LRPM - Enduring Acquisition Pathway has not yet been determined. C91511 LRPM - Enduring FY 2027 funding request of $29.674 million supports the procurement of 52 LRPM All Up Rounds (AUR). C91521 Low Altitude Stalking and Strike Ordnance (LASSO) FY 2027 funding request of $109.517 million supports the procurement of 53 Fire Control Units (FCU) and 430 All-Up Rounds (AURs) in support of the Lethal Unmanned Systems Directed Requirement (LUS DR) In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 6872C91500 - FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS Army UNCLASSIFIED Page 3 of 14 P-1 Line #20 Volume 1 - 211 === page 242 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6872C91500 / FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C91511 / LRPM ENDURING MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) - - - 52 - 52 Gross/Weapon System Cost ($ in Millions) - - - 29.674 - 29.674 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - - 29.674 - 29.674 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - - 29.674 - 29.674 - - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - 570.654 - - 570.654 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost (†) All Up Rounds - - - - - - - - - 52 16.928 - - - Acceptance Testing - - - - - - - - - 325.538 - - 1.152 - - - 325.538 - - 52 16.928 1.152 Subtotal: Recurring Cost - - - - - - - - - - - 18.080 - - - - - 18.080 - - - - - - - - - - - 5.447 - - - - - 5.447 - - - - - - - - - - - 5.447 - - - - - 5.447 - - - - - - - - - - - 23.527 - - - - - 23.527 Software Maintenance - - - - - - - - - - - 1.728 - - - - - 1.728 Subtotal: Recurring Cost - - - - - - - - - - - 1.728 - - - - - 1.728 - - - - - - - - - - - 1.728 - - - - - 1.728 - - - - - - - - - - - 0.147 - - - - - 0.147 - - - - - - - - - - - 0.147 - - - - - 0.147 Non Recurring Cost Non-Recurring Production Subtotal: Non Recurring Cost Subtotal: Flyaway Cost Software Cost Recurring Cost Subtotal: Software Cost Support - New Equipment Training (NET) Cost Training Support Subtotal: Support - New Equipment Training (NET) Cost Support - Program Management Cost LI 6872C91500 - FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS Army UNCLASSIFIED Page 4 of 14 P-1 Line #20 Volume 1 - 212 === page 243 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6872C91500 / FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C91511 / LRPM ENDURING MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Government Management Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - - - - - - - - - - 4.272 - - - - - 4.272 Subtotal: Support - Program Management Cost - - - - - - - - - - - 4.272 - - - - - 4.272 Gross/Weapon System Cost - - - - - - - - - 52 29.674 - - - 52 29.674 570.654 570.654 Remarks: FY27 Non-Recurring Engineering ($5.447M) supports the transition from prototype to production configuration and the facilitization of the production line. Secondary Distribution Army Total: Secondary Distribution (†) FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total Quantity - - 52 - 52 Total Obligation Authority - - 29.674 - 29.674 Quantity - - 52 - 52 Total Obligation Authority - - 29.674 - 29.674 indicates the presence of a P-5a LI 6872C91500 - FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS Army UNCLASSIFIED Page 5 of 14 P-1 Line #20 Volume 1 - 213 === page 244 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (†) All Up Rounds (†) O O C P-1 Line Item Number / Title: 6872C91500 / FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS FY Contractor and Location Method/Type or Funding Vehicle 2027 TBD / TBD C / TBD Location of PCO Award Date Date of First Delivery Redstone Arsenal, AL Jul 2027 Apr 2028 Item Number / Title [DODIC]: C91511 / LRPM ENDURING Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) 52 325.538 N RFP Issue Date Jul 2026 indicates the presence of a P-21 LI 6872C91500 - FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS Army UNCLASSIFIED Page 6 of 14 P-1 Line #20 Volume 1 - 214 === page 245 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6872C91500 / FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C91511 / LRPM ENDURING Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P J U L A U G S E P B A L A N C E All Up Rounds 1 2027 ARMY 52 0 52 A - LI 6872C91500 - FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS Army J U L A U G UNCLASSIFIED Page 7 of 14 S E P O C T N O V D E C J A N F E B P-1 Line #20 M A R 18 A P R 17 M A Y 17 J U N 0 Volume 1 - 215 === page 246 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6872C91500 / FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: C91511 / LRPM ENDURING Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 TBD - TBD MSR For 2027 1-8-5 For 2027 MAX For 2027 20 100 600 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 9 9 Total After Oct 1 ALT Prior to Oct 1 18 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 Remarks: Production lead time is an estimate pending final contract award. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 6872C91500 - FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS Army UNCLASSIFIED Page 8 of 14 P-1 Line #20 Volume 1 - 216 0 === page 247 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6872C91500 / FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C91521 / LOW ALTITUDE STALKING AND STRIKE ORDNANCE (LASSO) MDAP/MAIS Code: Resource Summary Prior Years FY 2025 Procurement Quantity (Units in Each) - Gross/Weapon System Cost ($ in Millions) - Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) - Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) - FY 2026 FY 2027 Base 345.491 - 95 67.816 109.517 - 109.517 - - 67.816 - - 109.517 - 345.491 FY 2027 Total 95 345.491 FY 2027 OOC 103 - 67.816 - - 109.517 - 109.517 - - 109.517 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - 658.408 - 1,152.811 - - 1,152.811 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost Government Program Management - - - - - 7.055 - - 8.129 - - 7.802 - - - - - 7.802 System Test and Evaluation - - - - - 2.279 - - 2.020 - - 0.192 - - - - - 0.192 Support Equipment - - - - - 17.199 - - 0.551 - - 0.903 - - - - - 0.903 Fielding - - - - - 16.084 - - 2.390 - - 11.167 - - - - - 11.167 - - - - - 42.617 - - 13.090 - - 20.064 - - - - - 20.064 - - - - - 42.617 - - 13.090 - - 20.064 - - - - - 20.064 - - - 49.482 257 12.717 69.204 98 6.782 68.516 95 6.509 - - - 68.516 95 6.509 - - - 112.814 2,572 290.157 167.052 287 47.944 148.910 557 82.943 - - - 148.910 557 82.943 89.452 Subtotal: Recurring Cost Subtotal: Flyaway Cost Hardware Cost Recurring Cost Fire Control Unit (FCU) Manufacturing Directed Requirement All Up Rounds (AUR) Manufacturing Directed Requirement (†) - - - - - 302.874 - - 54.726 - - 89.452 - - - - - Subtotal: Hardware Cost Subtotal: Recurring Cost - - - - - 302.874 - - 54.726 - - 89.452 - - - - - 89.452 Gross/Weapon System Cost - - - - - 345.491 103 67.816 95 109.517 - - - 95 109.517 LI 6872C91500 - FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS Army 658.408 UNCLASSIFIED Page 9 of 14 1,152.811 P-1 Line #20 1,152.811 Volume 1 - 217 === page 248 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 P-1 Line Item Number / Title: 6872C91500 / FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C91521 / LOW ALTITUDE STALKING AND STRIKE ORDNANCE (LASSO) MDAP/MAIS Code: Remarks: Funding increases from FY 2026 to FY 2027 due to additional vendor and economies of scale. FY 2027 procures 557AUR and 95 FCU. The P-21 will be based on the deliveries for the AUR. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 345.491 345.491 FY 2027 OOC FY 2027 Total 103 95 - 95 67.816 109.517 - 109.517 103 95 - 95 67.816 109.517 - 109.517 indicates the presence of a P-5a LI 6872C91500 - FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS Army UNCLASSIFIED Page 10 of 14 P-1 Line #20 Volume 1 - 218 === page 249 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements All Up Rounds (AUR) Manufacturing Directed Requirement (†) All Up Rounds (AUR) Manufacturing Directed Requirement (†) All Up Rounds (AUR) Manufacturing Directed Requirement (†) (†) O O C P-1 Line Item Number / Title: 6872C91500 / FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: C91521 / LOW ALTITUDE STALKING AND STRIKE ORDNANCE (LASSO) FY Contractor and Location Method/Type or Funding Vehicle 2025 Aerovironment / Simi Valley, CA SS / FFP ACC-APG Mar 2025 Dec 2025 2,572 112.814 Y 2026 Various / Various C / FFP ACC-APG Apr 2026 Dec 2026 287 167.052 N 2027 Various / Various C / FFP ACC-APG Mar 2027 Dec 2027 557 148.910 N Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($ K) RFP Issue Date indicates the presence of a P-21 LI 6872C91500 - FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS Army UNCLASSIFIED Page 11 of 14 P-1 Line #20 Volume 1 - 219 === page 250 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6872C91500 / FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C91521 / LOW ALTITUDE STALKING AND STRIKE ORDNANCE (LASSO) Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R 200 200 200 200 A P R M A Y J U N J U L A U G S E P 200 200 200 200 200 200 572 - - - - - 287 All Up Rounds (AUR) Manufacturing Directed Requirement 1 2025 ARMY 2,572 0 2,572 2 2026 ARMY 287 0 287 2 2027 ARMY 557 0 557 A - - - - - - - - - A - 557 O C T N O V D E C J A N F E B M A R A P R LI 6872C91500 - FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS Army M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 14 S E P O C T N O V D E C J A N F E B P-1 Line #20 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 220 === page 251 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6872C91500 / FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: C91521 / LOW ALTITUDE STALKING AND STRIKE ORDNANCE (LASSO) Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P All Up Rounds (AUR) Manufacturing Directed Requirement 1 2025 ARMY 2,572 2,000 572 200 200 172 2 2026 ARMY 287 0 287 - - 40 2 2027 ARMY 557 0 557 0 40 40 40 A - O C T N O V D E C J A N F E B M A R 40 40 47 - - - A P R LI 6872C91500 - FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS Army M A Y J U N 0 J U L A U G UNCLASSIFIED Page 13 of 14 S E P O C T N O V 55 D E C 55 J A N 55 F E B P-1 Line #20 55 M A R 55 A P R 55 M A Y 55 J U N 55 J U L 55 A U G 62 S E P Volume 1 - 221 0 === page 252 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6872C91500 / FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS Appropriation / Budget Activity / Budget Sub Activity: 2032A / 02 / 30 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: C91521 / LOW ALTITUDE STALKING AND STRIKE ORDNANCE (LASSO) Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Aerovironment - Simi Valley, CA 35 100 200 2 5 9 14 14 5 7 12 2 Various - Various 35 100 200 2 5 9 14 14 5 7 12 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 6872C91500 - FAMILY OF LOW ALTITUDE UNMANNED SYSTEMS Army UNCLASSIFIED Page 14 of 14 P-1 Line #20 Volume 1 - 222 === page 253 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 0962C50700 / Patriot Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 03: Modification of Missiles / BSA 10: Modifications Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0607865A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 6,057.247 6,057.247 6,057.247 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 171.958 171.958 171.958 757.800 757.800 757.800 796.837 - - 796.837 - 796.837 - - - 796.837 - 796.837 - - 796.837 574.847 574.847 574.847 215.159 215.159 215.159 234.767 234.767 234.767 To FY 2031 Complete 225.781 Continuing 225.781 Continuing Continuing 225.781 Total - Continuing - - Continuing Continuing - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 504,770.583 - 31,575.000 33,201.542 - 33,201.542 23,951.958 Continuing Continuing Description: This funding line is a key enabler of the Army Modernization Priorities in support of Air and Missile Defense. The PATRIOT Mods program implements critical capability, readiness and sustainability modifications to the weapon system, maintains Integrated Logistics Support, and supports materiel solutions to counter cybersecurity and electronic warfare shortcomings to all elements of the Lower Tier Battle Space. Required modifications are identified through various means to include: validated requirement documents such as the Capability Production Document (CPD), Capabilities Development Document (CDD), and the Operational Needs Statement (ONS); material changes supported by improved operational effectiveness as identified in the PATRIOT Product Improvement Program (PIP); material deficiencies identified in the field; obsolescence mitigation; emerging technologies; software improvements related to warfighter machine and crew interface requirements and communication upgrades. Modifications outlined below are critical to maintain capabilities in the field for enduring PATRIOT components, or are critical in support of the transition to an Army Integrated Air and Missile Defense (AIAMD) in convergence efforts with the Integrated Battle Command System (IBCS). FY 2027 PATRIOT Mods funding supports International Engineering Services Program (IESP); Integrated Logistics Support (ILS); System Engineering and Technical Analysis activities supporting Reliability, Availability, and Maintainability (RAM) Mods; Recapitalization (RECAP); Battery Command Post/ Tactical Command System /Computer Software Module (BCP/TCS/CSM) Mod; Assured Position, Navigation, and Timing (APNT), continued unit ONS fielding support while awaiting the Army standard solution, Report Rocket Classification and Army Capabilities Manager (ACM) Priorities. 1. RAM modifications provide resolution to field failures which are identified through component analysis, field data collection, obsolescence issues and emerging technologies which are prioritized based on readiness and Operations and Support (O&S) impacts. This effort includes the engineering, acquisition, qualification testing, installation, technical support and training device upgrades associated with modification and design changes which are essential to stabilize the system at the highest readiness posture available and reduction of O&S. Kit quantity is based on expected Engineering Change Proposals (ECPs) to be applied to Major End Items (MEIs). Quantities will be procured at an optimized rate utilizing price advantage created through contract negotiation, other service procurement, and/or foreign military sales into a buy-to-budget procurement strategy. 2. Recapitalization (RECAP) Modifications (1 battalion/year) include critical upgrades including but not limited to: Family of Medium Tactical Vehicles (FMTV), PATRIOT-unique prime mover obsolescence mitigation, Depot Maintenance Plant Equipment (DMPE), Harmonic Generator Kits, Post Deployment Build 8.1 (PDB-8.1) and Hardware (H/W), Cryptographic Modernization Kits, Missile Segment Enhancement (MSE) Launching station upgrades; Radar Digital Sidelobe Canceller upgrade, Radar Weapons Control Interface Unit (RWCIU) obsolescence mitigation, Radar Search/Track Microwave Front Ends LI 0962C50700 - Patriot Mods Army UNCLASSIFIED Page 1 of 42 P-1 Line #21 Volume 1 - 223 === page 254 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 0962C50700 / Patriot Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 03: Modification of Missiles / BSA 10: Modifications Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0607865A Line Item MDAP/MAIS Code: N/A modernization, Radar Peripheral Electronics Assembly (PEA) box modernization, Electronic Power Plant (EPP) obsolescence mitigation, and Cooling Liquid Electron Tube (CLET) kits. These modifications are synchronized within the RECAP program. RECAP is a battalion set, resulting in a more supportable, reliable, and capable unit in the force. 3. Digital Exciter (DEX) is an obsolescence mitigation effort to the Patriot Radar's Analog Exciter (AEX). Thirty total DEX Kits will be produced to ensure the operational Patriot capability is able to be retained until full divestment by LTAMDS. 5. The Air Defense Interrogator (ADI) TPX-57 uses an Interrogator Reply Processor (IRP) card that is obsolete. To mitigate the obsolescence and to be compliant to the Position, Navigation, and Timing (PNT) Reference Architecture (RA) v1.0, Patriot began the nonrecurring engineering for the integration of the AN/TPX-57A(V)1 Identify Friend or Foe (IFF) interrogator which was defined in the Patriot Assured PNT Strategy document to be the next generation upgrade for the ADI TPX. The current internal PNT card is removed and replaced by an external Next Generation Global Positioning System (GPS) solution. 7. The Battery Command Post/Tactical Command System/Computer Software Module (BCP/TCS/CSM) effort continues the development of the Capabilities Development Document (CDD) required Battle Management, Command, Control, Communications, Computers, and Intelligence (BMC4I) capability to maintain compatibility with tactical software enhancements, while enhancing and improving the defense design and planning capabilities for the PATRIOT warfighter. This includes systems engineering, software requirements, software design/code/test and independent validation and verification testing. This effort also provides Integrated Logistics Support, required due to the large amount of Commercial-Off-The-Shelf components, of the 62 Battery Command Posts and 17 Tactical Command Systems. Additionally, this effort supports the BCP/TCS/CSM fielding upgrades for each PATRIOT Post Deployment Build update. Note: Quantities procured and installed in prior years. 8. The Tactical Planner Workstation Augmentation Support provides for Subject Matter Expert training augmentation to assist in training the Schoolhouse trainers (Train the Trainers) with advanced concepts, capabilities and processes for training the full capabilities and uses of the Tactical Planner Workstation (TPW) software for the Schoolhouse and Deployed Units. This training is an augmentation to the NET training enabling trainers to receive advanced training for full capability of the TPW software. 9. PATRIOT's International Engineering Services Program (IESP) is a US chartered multi-national cost sharing program which allows the current 17 FMS partners to contribute toward common, non-RDTE engineering activities required to sustain PATRIOT capability. This cost share program structure is at a ratio of 2:1 FMS dollars to USD investment. Consolidated funds provide essential engineering services toward enhancing PATRIOT fleet readiness for both the United States Army and International partners. Significant cost avoidance is achieved by sharing expenses that would otherwise be fully funded by the United States to achieve the same result. 10. Logistics Recurring includes all aspects of Integrated Logistics Support (ILS) management, e.g., maintenance support, facilities, personnel, training, testing, and fielding. 11. Report Rocket Classification: The modern Air and Missile Defense environment contains a wide variety and large quantities of TBM and rocket threats. This task provides situational awareness for operators and allows for greater efficiency in management of interceptor inventories in the complex AMD environment. 25. Assured Position, Navigation and Timing (A-PNT) (Mod Item 25 of 28) - Purchases integrated Project Manager (PM) PNT M-code capable hardware for integration on Patriot Major End Items (MEI). Effort supports mandated FY 2011 National Defense Authorization Act; public law 111-383 Sec. 913. . Secondary Distribution Army Quantity Total Obligation Authority Total: Quantity LI 0962C50700 - Patriot Mods Army FY 2025 FY 2027 Base FY 2026 - 171.958 - 757.800 - FY 2027 OOC - 796.837 - UNCLASSIFIED Page 2 of 42 FY 2027 Total - FY 2028 - FY 2029 - 796.837 574.847 - - P-1 Line #21 FY 2030 - 215.159 - FY 2031 - 234.767 - 225.781 - Volume 1 - 224 === page 255 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 0962C50700 / Patriot Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 03: Modification of Missiles / BSA 10: Modifications Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0607865A Line Item MDAP/MAIS Code: N/A Secondary Distribution Secondary Distribution Total Obligation Authority LI 0962C50700 - Patriot Mods Army FY 2025 171.958 FY 2026 757.800 FY 2027 Base FY 2027 OOC 796.837 UNCLASSIFIED Page 3 of 42 FY 2027 Total - FY 2028 796.837 574.847 P-1 Line #21 FY 2029 215.159 FY 2030 FY 2031 234.767 225.781 Volume 1 - 225 === page 256 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 0962C50700 / Patriot Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 03: Modification of Missiles / BSA 10: Modifications ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: 0607865A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a C50700 / Patriot Mods (Various) - / 6,057.247 - / 171.958 - / 757.800 - / 796.837 - / - - P-40 Total Gross/Weapon System Cost - / 6,057.247 - / 171.958 - / 757.800 - / 796.837 - / - - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code / 796.837 / 796.837 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a C50700 / Patriot Mods (Various) - / 574.847 - / 215.159 - / 234.767 - / 225.781 Continuing Continuing P-40 Total Gross/Weapon System Cost - / 574.847 - / 215.159 - / 234.767 - / 225.781 Continuing Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 procurement dollars in the amount of $796.837 million support the modifications for Reliability, Availability, and Maintainability Modifications (RAM Mods), Recapitalization (RECAP), Battery Command Post/ Tactical Command System/ Computer Software Module (BCP/TCS/CSM), PATRIOT Radar Digital Exciter, Report Rocket Classification, Assured PNT, the Tactical Planner Workstation Augmentation, and Communications Obsolescence. FY 2027 procurement dollars will also fund the Air Defense Interrogator (ADI) TPX 57 Obsolescence, IESP, system engineering, program management, launcher hardware and logistics support. Increase from FY 2026 to FY 2027 of $39.037 million results from increased funding to support PATRIOT Readiness Requirements for RAM Mods, Recapitalization, Logistics Recurring, and Launcher Hardware. LI 0962C50700 - Patriot Mods Army UNCLASSIFIED Page 4 of 42 P-1 Line #21 Volume 1 - 226 === page 257 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 0962C50700 / Patriot Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) - Gross/Weapon System Cost ($ in Millions) 6,057.247 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 6,057.247 Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) 6,057.247 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 171.958 757.800 - 796.837 - 171.958 - 757.800 - - - - 757.800 796.837 - 796.837 - 171.958 - 796.837 - 796.837 - - 796.837 574.847 215.159 - - Continuing - 234.767 Continuing - 225.781 - 215.159 Continuing - 234.767 Total - 225.781 - 215.159 574.847 - 234.767 - 574.847 To FY 2031 Complete 225.781 Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) 504,770.583 - - - - 31,575.000 - 33,201.542 - - 33,201.542 23,951.958 - - - - - - Continuing Continuing Description: The PATRIOT weapon system modernization program implements modifications to the weapon system and maintains Integrated Logistics Support. Required modifications are identified through various means, including the following: validated requirements documents such as Capability Production Documents and Operational Needs Statements; material changes identified in the PATRIOT Product Improvement Program (PIP); material deficiencies identified in the field; obsolescence issues; crew interface and communications upgrades. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 0962C50700 - Patriot Mods Army FY 2025 FY 2027 Base FY 2026 - 171.958 171.958 757.800 757.800 FY 2027 OOC - 796.837 796.837 UNCLASSIFIED Page 5 of 42 FY 2027 Total - FY 2028 - FY 2029 - 796.837 574.847 - - 796.837 574.847 P-1 Line #21 FY 2030 - 215.159 215.159 FY 2031 - 234.767 234.767 225.781 225.781 Volume 1 - 227 === page 258 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 0962C50700 / Patriot Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Various Modification Type: Various Prior Years Financial Plan Modification Number / Title: C50700 / Patriot Mods FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 29: RAM Mods A Kits Recurring Kit Quantity Training 7,483 / 812.890 - Training Equipment - - / - Continuing Continuing / 155.205 - / 3.387 - / 3.028 - / 6.427 - / - - / 6.427 - / 7.608 - / 6.720 - / 7.526 - / 7.752 Continuing Continuing / 52.762 - / 2.635 - / 3.383 - / 4.164 - / - - / 4.164 - / 7.250 - / 5.227 - / 8.358 - / 7.929 Continuing Continuing - / 6.398 - / 5.608 - / 12.050 - / - - / 12.050 - / 16.253 - / 11.691 - / 16.440 - / 16.933 Continuing Continuing / 10.161 - / 8.333 - / 19.540 - / - - / 19.540 - / 15.682 - / 16.270 - / 16.889 - / 17.396 Continuing Continuing / 1.129 - / 1.343 / 3.014 - / - / 4.174 Continuing Continuing Support Equipment - / 107.739 Fielding Support and NET - / 180.209 Integrated Logistics Support - Subtotal: Recurring Subtotal: RAM Mods 87 / 13.925 - / 22.379 - 103 / 16.558 137 / 23.168 - 137 / 23.168 - / 3.014 110 / 19.771 - 142 / 26.283 / 3.657 - 151 / 29.437 / 3.540 - 148 / 30.320 / 5.052 - 7,483 / 1,331.184 87 / 37.635 103 / 38.253 137 / 68.363 - / - 137 / 68.363 110 / 70.221 142 / 69.731 151 / 83.702 148 / 84.504 Continuing Continuing 7,483 / 1,331.184 87 / 37.635 103 / 38.253 137 / 68.363 - / - 137 / 68.363 110 / 70.221 142 / 69.731 151 / 83.702 148 / 84.504 Continuing Continuing 1 / 9.152 - / - / 1.006 - / - - Modification Item 2 of 29: Recapitalization A Kits Recurring Kit Quantity 21 / 324.908 1 / 12.047 1 / 12.449 Integrated Logistics Support - - - / 25.723 / 1.200 / 1.166 - 1 / 9.152 / 1.006 1 / 11.133 1 / 13.207 1 / 24.433 1 / 25.217 Continuing Continuing - - - - / 1.125 Continuing Continuing / 0.920 / 0.929 / 1.092 Subtotal: Recurring 21 / 350.631 1 / 13.247 1 / 13.615 1 / 10.158 - / - 1 / 10.158 1 / 12.053 1 / 14.136 1 / 25.525 1 / 26.342 Continuing Continuing Subtotal: Recapitalization 21 / 350.631 1 / 13.247 1 / 13.615 1 / 10.158 - / - 1 / 10.158 1 / 12.053 1 / 14.136 1 / 25.525 1 / 26.342 Continuing Continuing Modification Item 3 of 29: PATRIOT Radar Digital Exciter (DEX) A Kits Recurring PATRIOT Radar Digital Exciter (DEX) Subtotal: Recurring Subtotal: PATRIOT Radar Digital Exciter (DEX) - / 29.588 - / 13.730 - / 54.000 - / 39.211 - / - - / 39.211 - / - - / - - / - - / - Continuing Continuing - / 29.588 - / 13.730 - / 54.000 - / 39.211 - / - - / 39.211 - / - - / - - / - - / - Continuing Continuing - / 29.588 - / 13.730 - / 54.000 - / 39.211 - / - - / 39.211 - / - - / - - / - - / - Continuing Continuing / 2.036 - / - / 12.594 Continuing Continuing Modification Item 4 of 29: Communications Obsolescence A Kits Recurring Kits LI 0962C50700 - Patriot Mods Army 4 / 121.652 1 / 22.612 - / 1.332 - UNCLASSIFIED Page 6 of 42 - / 2.036 - / 1.686 - / 10.041 P-1 Line #21 - / 14.649 - Volume 1 - 228 === page 259 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 0962C50700 / Patriot Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Various Modification Type: Various Prior Years Financial Plan Modification Number / Title: C50700 / Patriot Mods FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Subtotal: Recurring Subtotal: Communications Obsolescence 4 / 121.652 1 / 22.612 - / 1.332 - / 2.036 - / - - / 2.036 - / 1.686 - / 10.041 - / 14.649 - / 12.594 Continuing Continuing 4 / 121.652 1 / 22.612 - / 1.332 - / 2.036 - / - - / 2.036 - / 1.686 - / 10.041 - / 14.649 - / 12.594 Continuing Continuing Modification Item 5 of 29: ADI TPX 57 Obsolescence A Kits Non-Recurring - / 6.657 - / 9.000 - / 7.448 - / 2.808 - / - - / 2.808 - / 2.830 - / 3.100 - / 4.255 - / 3.892 Continuing Continuing Subtotal: Non-Recurring ADI TPX - / 6.657 - / 9.000 - / 7.448 - / 2.808 - / - - / 2.808 - / 2.830 - / 3.100 - / 4.255 - / 3.892 Continuing Continuing Subtotal: ADI TPX 57 Obsolescence - / 6.657 - / 9.000 - / 7.448 - / 2.808 - / - - / 2.808 - / 2.830 - / 3.100 - / 4.255 - / 3.892 Continuing Continuing Modification Item 6 of 29: Dismounted Information Coordination Central B Kits Non-Recurring Dismounted Information Coordination Cent Subtotal: Non-Recurring Subtotal: Dismounted Information Coordination Central 8 / 55.074 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 8 / 55.074 8 / 55.074 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 8 / 55.074 8 / 55.074 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 8 / 55.074 Modification Item 7 of 29: BCP/TCS/CSM A Kits Recurring Engineering Change Orders - Fielding Support - Obsolescence/Tech Refresh - / 8.135 - / 0.810 - / 0.832 - / 0.830 - / - - / 0.830 - / 0.830 - / 0.903 - / 2.011 - / 2.041 Continuing Continuing / 10.927 - / 0.980 - / 0.735 - / 0.637 - / - - / 0.637 - / 0.650 - / 0.669 - / 1.249 - / 0.771 Continuing Continuing / 3.077 - / 0.500 - / 0.210 - / 0.295 - / - - / 0.295 - / 0.200 - / 0.256 - / 1.257 - / 0.779 Continuing Continuing Software/Systems Engineering - / 35.758 - / 0.987 - / 0.680 - / 0.637 - / - - / 0.637 - / 0.624 - / 0.643 - / 1.020 - / 1.051 Continuing Continuing Integrated Logistics Support - / 68.767 - / 3.373 - / 3.793 - / 2.246 - / - - / 2.246 - / 2.246 - / 2.313 - / 3.041 - / 3.132 Continuing Continuing / 126.664 - / 6.650 - / 6.250 - / 4.645 - / - - / 4.645 - / 4.550 - / 4.784 - / 8.578 - / 7.774 Continuing Continuing Subtotal: Recurring - Non-Recurring BCP Kit Quantity Subtotal: Non-Recurring Subtotal: BCP/TCS/CSM 62 / 29.435 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 62 / 29.435 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 4.645 - / - / 7.774 Continuing 62 / 156.099 - / 6.650 - / 6.250 - - / 4.645 - / 4.550 - / 4.784 - / 8.578 - 62 / 29.435 62 / 29.435 Continuing Modification Item 8 of 29: Tactical Planner Workstation Augmentation Support B Kits Non-Recurring LI 0962C50700 - Patriot Mods Army UNCLASSIFIED Page 7 of 42 P-1 Line #21 Volume 1 - 229 === page 260 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 0962C50700 / Patriot Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Various Modification Type: Various Prior Years Financial Plan Modification Number / Title: C50700 / Patriot Mods FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) TPW Augmentation Spt - / 0.648 - / 0.190 - / 0.150 - / 0.130 - / - - / 0.130 - / 0.130 - / 0.144 - / 0.163 - / 0.175 Continuing Continuing Subtotal: Non-Recurring - / 0.648 - / 0.190 - / 0.150 - / 0.130 - / - - / 0.130 - / 0.130 - / 0.144 - / 0.163 - / 0.175 Continuing Continuing - / 0.648 - / 0.190 - / 0.150 - / 0.130 - / - - / 0.130 - / 0.130 - / 0.144 - / 0.163 - / 0.175 Continuing Continuing Subtotal: Tactical Planner Workstation Augmentation Support Modification Item 9 of 29: International Engineering Services Program (IESP) A Kits Recurring International Engineering Services Prog Subtotal: Recurring Subtotal: International Engineering Services Program (IESP) - / 214.654 - / 41.904 - / 42.630 - / 43.688 - / - - / 43.688 - / 42.065 - / 43.655 - / 49.894 - / 47.950 Continuing Continuing - / 214.654 - / 41.904 - / 42.630 - / 43.688 - / - - / 43.688 - / 42.065 - / 43.655 - / 49.894 - / 47.950 Continuing Continuing - / 214.654 - / 41.904 - / 42.630 - / 43.688 - / - - / 43.688 - / 42.065 - / 43.655 - / 49.894 - / 47.950 Continuing Continuing Modification Item 10 of 29: Logistics Recurring A Kits Recurring Logistics Support - / 95.991 - / 19.690 - / 17.722 - / 17.119 - / - - / 17.119 - / 17.901 - / 17.968 - / 26.832 - / 23.298 Continuing Continuing Subtotal: Recurring - / 95.991 - / 19.690 - / 17.722 - / 17.119 - / - - / 17.119 - / 17.901 - / 17.968 - / 26.832 - / 23.298 Continuing Continuing Subtotal: Logistics Recurring - / 95.991 - / 19.690 - / 17.722 - / 17.119 - / - - / 17.119 - / 17.901 - / 17.968 - / 26.832 - / 23.298 Continuing Continuing - / 22.522 - / 1.000 - / 4.750 - / 7.900 - / - - / 7.900 - / 8.190 - / 8.436 - / 11.448 - / 10.155 Continuing Continuing - / 22.522 - / 1.000 - / 4.750 - / 7.900 - / - - / 7.900 - / 8.190 - / 8.436 - / 11.448 - / 10.155 Continuing Continuing - / 22.522 - / 1.000 - / 4.750 - / 7.900 - / - - / 7.900 - / 8.190 - / 8.436 - / 11.448 - / 10.155 Continuing Continuing Modification Item 11 of 29: Report Rocket Classification A Kits Non-Recurring Kits Subtotal: Non-Recurring Subtotal: Report Rocket Classification Modification Item 12 of 29: PATRIOT Maintenance Trainer (PMT) A Kits Recurring Kit Quantity Subtotal: Recurring 7 / 107.441 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / 107.441 7 / 107.441 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / 107.441 - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Non-Recurring Training Support LI 0962C50700 - Patriot Mods Army / 4.000 UNCLASSIFIED Page 8 of 42 P-1 Line #21 / 4.000 Volume 1 - 230 === page 261 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 0962C50700 / Patriot Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Various Modification Type: Various Prior Years Financial Plan Subtotal: Non-Recurring Subtotal: PATRIOT Maintenance Trainer (PMT) Modification Number / Title: C50700 / Patriot Mods FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) / 4.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - 7 / 111.441 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / 111.441 30 / 50.770 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 30 / 50.770 30 / 50.770 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 30 / 50.770 30 / 50.770 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 30 / 50.770 - / 4.000 Modification Item 13 of 29: PATRIOT Multi-Echelon Training (PMET) A Kits Recurring Kit Quantity Subtotal: Recurring Subtotal: PATRIOT Multi-Echelon Training (PMET) Modification Item 14 of 29: SNAP/TROPO A Kits Recurring Kit Quantity SNAP 6 / 0.830 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Support - / 8.041 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 8.041 Integrated Logistics Support - / 3.993 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 3.993 Training - / 0.175 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.175 Equipment - / 0.859 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.859 6 / 13.898 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 6 / 13.898 Kit Quantity TROPO 26 / 12.884 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 26 / 12.884 Subtotal: Non-Recurring 26 / 12.884 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 26 / 12.884 32 / 26.782 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 32 / 26.782 375 / 613.113 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 375 / 613.113 375 / 613.113 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 375 / 613.113 375 / 613.113 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 375 / 613.113 Subtotal: Recurring 6 / 0.830 Non-Recurring Subtotal: SNAP/TROPO Modification Item 15 of 29: Enhanced Launcher Electronics System (ELES) A Kits Recurring Kit Quantity Subtotal: Recurring Subtotal: Enhanced Launcher Electronics System (ELES) Modification Item 16 of 29: Digital Sidelobe Canceller (DSLC) A Kits LI 0962C50700 - Patriot Mods Army UNCLASSIFIED Page 9 of 42 P-1 Line #21 Volume 1 - 231 === page 262 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 0962C50700 / Patriot Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Various Modification Type: Various Prior Years Financial Plan Modification Number / Title: C50700 / Patriot Mods FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Recurring Kit Quantity Subtotal: Recurring Subtotal: Digital Sidelobe Canceller (DSLC) 81 / 180.382 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 81 / 180.382 81 / 180.382 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 81 / 180.382 81 / 180.382 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 81 / 180.382 Modification Item 17 of 29: Command Obsolescence Alleviation A Kits Recurring Command Obsolescnece Alleviation - / 8.989 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 8.989 - / 8.989 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 8.989 - / 8.989 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 8.989 - / 23.995 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 23.995 - / 23.995 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 23.995 - / 23.995 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 23.995 Subtotal: Recurring Subtotal: Command Obsolescence Alleviation Modification Item 18 of 29: MAP/RDP Encryption Compliance A Kits Non-Recurring Certification Subtotal: Non-Recurring Subtotal: MAP/RDP Encryption Compliance Modification Item 19 of 29: IFF Antenna Redesign A Kits Non-Recurring 27 / 12.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 27 / 12.000 Subtotal: Non-Recurring Kits 27 / 12.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 27 / 12.000 Subtotal: IFF Antenna Redesign 27 / 12.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 27 / 12.000 150 / 48.970 150 / 48.970 Modification Item 20 of 29: Combined Crypto Modification Phase I (CCMPI) A Kits Recurring Kit Quantity Kit Quantity (GFE) Subtotal: Recurring - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 1.072 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 150 / 50.042 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - - / 1.072 150 / 50.042 Non-Recurring LI 0962C50700 - Patriot Mods Army UNCLASSIFIED Page 10 of 42 P-1 Line #21 Volume 1 - 232 === page 263 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 0962C50700 / Patriot Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Various Modification Type: Various Prior Years Financial Plan Modification Number / Title: C50700 / Patriot Mods FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Training - / 0.396 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.396 - / 0.396 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.396 150 / 50.438 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 150 / 50.438 Kit Quantity 80 / 240.766 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 80 / 240.766 Fielding - / 14.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 14.000 Support Equipment - / 36.942 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 36.942 80 / 291.708 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 80 / 291.708 80 / 291.708 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 80 / 291.708 Radar Kit Quantity 4 / 96.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 96.000 Subtotal: Recurring 4 / 96.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 96.000 4 / 96.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 96.000 - Subtotal: Non-Recurring Subtotal: Combined Crypto Modification Phase I (CCMPI) Modification Item 21 of 29: Radar Digital Processor Configuration (RDP-C) A Kits Recurring Subtotal: Recurring Subtotal: Radar Digital Processor - Configuration (RDPC) Modification Item 22 of 29: Air Defense Artillery School Upgrades/ TADSS A Kits Recurring Subtotal: Air Defense Artillery School Upgrades/ TADSS Modification Item 23 of 29: Modern Manstation (MMS) A Kits Recurring Fielding / 7.825 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Support Equipment - / 56.567 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - - / 56.567 / 7.825 Subtotal: Recurring - / 64.392 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 64.392 82 / 55.842 Non-Recurring 82 / 55.842 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Subtotal: Non-Recurring Kit Quantity 82 / 55.842 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 82 / 55.842 Subtotal: Modern Manstation (MMS) 82 / 120.234 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 82 / 120.234 Modification Item 24 of 29: Reconfigurable Table Top Trainers (RT3) LI 0962C50700 - Patriot Mods Army UNCLASSIFIED Page 11 of 42 P-1 Line #21 Volume 1 - 233 === page 264 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 0962C50700 / Patriot Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Various Modification Type: Various Prior Years Financial Plan Modification Number / Title: C50700 / Patriot Mods FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) A Kits Recurring Kit Quantity 489 / 31.338 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 489 / 31.338 489 / 31.338 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 489 / 31.338 489 / 31.338 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 489 / 31.338 Hardware Integration 798 / 3.400 1,250 / 5.000 1,712 / 6.850 1,187 / 4.897 - / - 1,187 / 4.897 5,000 / 6.500 - / 6.825 - / 9.721 - / 9.097 - / - 9,947 / 52.290 Subtotal: Recurring 798 / 3.400 1,250 / 5.000 1,712 / 6.850 1,187 / 4.897 - / - 1,187 / 4.897 5,000 / 6.500 - / 6.825 - / 9.721 - / 9.097 - / - 9,947 / 52.290 798 / 3.400 1,250 / 5.000 1,712 / 6.850 1,187 / 4.897 - / - 1,187 / 4.897 5,000 / 6.500 - / 6.825 - / 9.721 - / 9.097 - / - 9,947 / 52.290 1 / 56.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 56.000 1 / 56.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 56.000 1 / 56.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 56.000 Subtotal: Recurring Subtotal: Reconfigurable Table Top Trainers (RT3) Modification Item 25 of 29: Assured PNT A Kits Recurring Subtotal: Assured PNT Modification Item 26 of 29: Test Detachment A Kits Recurring Equipment Subtotal: Recurring Subtotal: Test Detachment Modification Item 27 of 29: Launcher Hardware A Kits Recurring Launcher Hardware 18 / 284.091 - / - 24 / 360.000 24 / 390.002 - / - 24 / 390.002 24 / 360.000 - / - - / - - / - Continuing Continuing Subtotal: Recurring 18 / 284.091 - / - 24 / 360.000 24 / 390.002 - / - 24 / 390.002 24 / 360.000 - / - - / - - / - Continuing Continuing Subtotal: Launcher Hardware 18 / 284.091 - / - 24 / 360.000 24 / 390.002 - / - 24 / 390.002 24 / 360.000 - / - - / - - / - Continuing Continuing Modification Item 28 of 29: Radar Replacement A Kits Recurring Radar Replacement 1 / 130.391 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 130.391 Subtotal: Recurring 1 / 130.391 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 130.391 Subtotal: Radar Replacement 1 / 130.391 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 130.391 Modification Item 29 of 29: ACM Readiness Priorities B Kits LI 0962C50700 - Patriot Mods Army UNCLASSIFIED Page 12 of 42 P-1 Line #21 Volume 1 - 234 === page 265 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 0962C50700 / Patriot Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Various Modification Type: Various Prior Years Financial Plan Modification Number / Title: C50700 / Patriot Mods FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Recurring ACM Readiness Priorities Subtotal: Recurring Subtotal: ACM Readiness Priorities Subtotal: Procurement, All Modification Items - / - - / - - / 203.500 - / 204.580 - / - - / 204.580 - / 47.421 - / 35.000 - / - - / - - / - - / 490.501 - / - - / - - / 203.500 - / 204.580 - / - - / 204.580 - / 47.421 - / 35.000 - / - - / - - / - - / 490.501 - / - - / - - / 203.500 - / 204.580 - / - - / 204.580 - / 47.421 - / 35.000 - / - - / - - / - - / 490.501 9,753 / 1,339 / 170.658 1,840 / 756.500 1,349 / 795.537 4,475.772 - / - 1,349 / 795.537 5,135 / 573.547 143 / 213.820 152 / 234.767 149 / 225.781 Continuing Continuing Installation Modification Item 1 of 29: RAM Mods 6,849 / 151.613 43 / - 106 / - 130 / - - / - 130 / - 166 / - 60 / - 180 / - 120 / - Continuing Continuing Modification Item 2 of 29: Recapitalization 17 / 235.330 1 / 1.300 1 / 1.300 1 / 1.300 - / - 1 / 1.300 1 / 1.300 1 / 1.339 - / - - / - Continuing Continuing Modification Item 7 of 29: BCP/TCS/CSM 79 / 1,192.582 - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing 150 / 1.950 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 131 / 1.300 167 / 1.300 61 / 1.339 - 796.837 574.847 215.159 Modification Item 20 of 29: Combined Crypto Modification Phase I (CCMPI) Modification Item 29 of 29: ACM Readiness Priorities Subtotal: Installation - / - 7,095 / 1,581.475 44 / 1.300 107 / 1.300 131 / 1.300 6,057.247 171.958 757.800 796.837 - / 4/ - 150 / 1.950 4/ - 180 / - 120 / - Continuing Continuing 234.767 225.781 Continuing Continuing Total Total Cost (Procurement + Support + Installation) LI 0962C50700 - Patriot Mods Army UNCLASSIFIED Page 13 of 42 P-1 Line #21 Volume 1 - 235 === page 266 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 0962C50700 / Patriot Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 1 of 29: RAM Mods Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Andover, MA Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 14 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2024 Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Delivery Dates Feb 2026 Feb 2027 Feb 2028 Feb 2029 Feb 2030 Feb 2031 Feb 2032 Installation Information Method of Implementation: Lead Logistics Fielding Team (Included in unit cost) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing 43 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - 86 / 0.000 62 / 0.000 - / - 62 / 0.000 - / - - / - - / - - / - - / - 125 / 0.000 68 / 0.000 68 / 0.000 - / - - / - - / - 70 / 0.000 205 / 0.000 60 / 0.000 - / - - / - - / - - / - - / - 60 / 0.000 - / - 120 / 0.000 - / - Prior Years 6,849 / 151.613 FY 2025 - / - FY 2026 - / - - / - FY 2027 - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 60 / 0.000 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 60 / 0.000 60 / 0.000 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - 60 / 0.000 60 / 0.000 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - 43 / 0.000 6,849 / 151.613 63 / 0.000 43 / 0.000 106 / 0.000 130 / 0.000 67 / 0.000 99 / 0.000 130 / 0.000 166 / 0.000 - 60 / 0.000 / - - 180 / 0.000 / - 7,246 / 0.000 120 / 0.000 Continuing 159 / 0.000 120 / 0.000 7,246 / 0.000 Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 In 7,570 21 22 22 22 25 26 26 26 34 34 35 34 27 27 28 28 35 35 36 36 30 30 30 30 30 30 30 30 6,65915,048 Out 7,455 28 28 29 30 21 22 22 22 25 26 26 26 34 34 35 34 27 27 28 28 30 30 30 30 30 30 30 30 6,80115,048 LI 0962C50700 - Patriot Mods Army UNCLASSIFIED Page 14 of 42 P-1 Line #21 Q4 TC Tot Volume 1 - 236 === page 267 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 0962C50700 / Patriot Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 2 of 29: Recapitalization Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 6 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Apr 2025 Apr 2026 Apr 2027 Apr 2028 Delivery Dates Apr 2026 Apr 2027 Apr 2028 Apr 2029 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Depot, PM Office, contractor team (Included in unit cost) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 15 / 232.730 - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing FY 2025 1 / 1.300 - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing FY 2026 1 / 1.300 - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing FY 2027 - / - 1 / 1.300 - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing FY 2028 - / - - / - 1 / 1.300 - / - - / - - / - - / - - / - - / - - / - Continuing FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - 1 / 1.300 - / - 1 / 1.300 1 / 1.300 1 / 1.339 - / - - / - Continuing Continuing 1 / 1.300 1 / 1.300 - / - 1 / 1.300 1 / 1.300 1 / 1.339 - / - - / - Continuing Continuing Total 17 / 235.330 1 / 1.300 Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 21 - - 1 - - - 1 - - - 1 - - - 1 - - - 1 - - - 1 - - - - - 9 36 Out 20 - - - - - - - - - - - - - - - - 10 36 1 - LI 0962C50700 - Patriot Mods Army 1 - 1 - 1 - UNCLASSIFIED Page 15 of 42 1 - 1 P-1 Line #21 - Volume 1 - 237 === page 268 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 0962C50700 / Patriot Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 3 of 29: PATRIOT Radar Digital Exciter (DEX) Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Organic LI 0962C50700 - Patriot Mods Army Installation Quantity: 0 UNCLASSIFIED Page 16 of 42 P-1 Line #21 Volume 1 - 238 === page 269 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 0962C50700 / Patriot Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 4 of 29: Communications Obsolescence Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Andover, MA Administrative Leadtime (in Months): 3 Dates FY 2025 Contract Dates Jan 2025 Delivery Dates Jun 2025 Production Leadtime (in Months): 5 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation (Organic): TBD LI 0962C50700 - Patriot Mods Army Installation Quantity: 0 UNCLASSIFIED Page 17 of 42 P-1 Line #21 Volume 1 - 239 === page 270 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 0962C50700 / Patriot Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 5 of 29: ADI TPX 57 Obsolescence Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): TBD LI 0962C50700 - Patriot Mods Army Installation Quantity: 0 UNCLASSIFIED Page 18 of 42 P-1 Line #21 Volume 1 - 240 === page 271 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 0962C50700 / Patriot Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 6 of 29: Dismounted Information Coordination Central Manufacturer Information Manufacturer Name: N/A Manufacturer Location: N/A Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Engineering Services (Included in unit cost) LI 0962C50700 - Patriot Mods Army Installation Quantity: 0 UNCLASSIFIED Page 19 of 42 P-1 Line #21 Volume 1 - 241 === page 272 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 0962C50700 / Patriot Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 7 of 29: BCP/TCS/CSM Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): Dates Production Leadtime (in Months): FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Various (Included in unit cost) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Continuing Continuing Prior Years 79 / 1,192.582 - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 79 / 1,192.582 Continuing Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 79 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 79 Out 79 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 79 LI 0962C50700 - Patriot Mods Army UNCLASSIFIED Page 20 of 42 P-1 Line #21 Volume 1 - 242 === page 273 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 0962C50700 / Patriot Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 8 of 29: Tactical Planner Workstation Augmentation Support Manufacturer Information Manufacturer Name: TBD Manufacturer Location: Various Administrative Leadtime (in Months): Production Leadtime (in Months): Dates FY 2025 FY 2026 Contract Dates Oct 2024 Oct 2025 Delivery Dates Oct 2024 Oct 2025 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation (Organic): Various LI 0962C50700 - Patriot Mods Army Installation Quantity: 0 UNCLASSIFIED Page 21 of 42 P-1 Line #21 Volume 1 - 243 === page 274 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 0962C50700 / Patriot Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 9 of 29: International Engineering Services Program (IESP) Manufacturer Information Manufacturer Name: Multiple Manufacturer Location: Various Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Various LI 0962C50700 - Patriot Mods Army Installation Quantity: 0 UNCLASSIFIED Page 22 of 42 P-1 Line #21 Volume 1 - 244 === page 275 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 0962C50700 / Patriot Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 10 of 29: Logistics Recurring Manufacturer Information Manufacturer Name: Logistics Manufacturer Location: Huntsville, AL Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Various LI 0962C50700 - Patriot Mods Army Installation Quantity: 0 UNCLASSIFIED Page 23 of 42 P-1 Line #21 Volume 1 - 245 === page 276 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 0962C50700 / Patriot Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 11 of 29: Report Rocket Classification Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Andover, MA Administrative Leadtime (in Months): 4 Production Leadtime (in Months): 5 Dates FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Delivery Dates Jun 2025 Jun 2026 Jun 2027 Jun 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation (Organic): PM Fielding Team (Included in Fielding cost) LI 0962C50700 - Patriot Mods Army Installation Quantity: 0 UNCLASSIFIED Page 24 of 42 P-1 Line #21 Volume 1 - 246 === page 277 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 0962C50700 / Patriot Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 12 of 29: PATRIOT Maintenance Trainer (PMT) Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Tewksbury, MA Administrative Leadtime (in Months): 4 Dates FY 2025 Contract Dates Feb 2025 Delivery Dates Jun 2025 Production Leadtime (in Months): 4 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation (Organic): PM Office, Contractor Team LI 0962C50700 - Patriot Mods Army Installation Quantity: 0 UNCLASSIFIED Page 25 of 42 P-1 Line #21 Volume 1 - 247 === page 278 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 0962C50700 / Patriot Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 13 of 29: PATRIOT Multi-Echelon Training (PMET) Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Tewksbury, MA Administrative Leadtime (in Months): 4 Dates FY 2025 Production Leadtime (in Months): 4 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): PM Office, Contractor Team (Included in unit cost) LI 0962C50700 - Patriot Mods Army Installation Quantity: 0 UNCLASSIFIED Page 26 of 42 P-1 Line #21 Volume 1 - 248 === page 279 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 0962C50700 / Patriot Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 14 of 29: SNAP/TROPO Manufacturer Information Manufacturer Name: TeleCommunication Systems (TCS) Manufacturer Location: Tampa, FL Administrative Leadtime (in Months): 1 Dates FY 2025 Production Leadtime (in Months): 9 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Depot, PM, contractor team LI 0962C50700 - Patriot Mods Army Installation Quantity: 0 UNCLASSIFIED Page 27 of 42 P-1 Line #21 Volume 1 - 249 === page 280 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 0962C50700 / Patriot Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 15 of 29: Enhanced Launcher Electronics System (ELES) Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 3 Dates FY 2025 Production Leadtime (in Months): 18 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Fielding Team (Included in unit cost) LI 0962C50700 - Patriot Mods Army Installation Quantity: 10 UNCLASSIFIED Page 28 of 42 P-1 Line #21 Volume 1 - 250 === page 281 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 0962C50700 / Patriot Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 16 of 29: Digital Sidelobe Canceller (DSLC) Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Tewkbury, MA Administrative Leadtime (in Months): 3 Dates FY 2025 Production Leadtime (in Months): 18 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Depot, PM Office, Contractor Team (Included in unit cost) LI 0962C50700 - Patriot Mods Army UNCLASSIFIED Page 29 of 42 Installation Quantity: 0 P-1 Line #21 Volume 1 - 251 === page 282 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 0962C50700 / Patriot Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 17 of 29: Command Obsolescence Alleviation Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 8 Dates FY 2025 Production Leadtime (in Months): 5 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): PM Office, Contractor Team (Included in unit cost) LI 0962C50700 - Patriot Mods Army Installation Quantity: 0 UNCLASSIFIED Page 30 of 42 P-1 Line #21 Volume 1 - 252 === page 283 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 0962C50700 / Patriot Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 18 of 29: MAP/RDP Encryption Compliance Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Andover, MA Administrative Leadtime (in Months): 4 Dates FY 2025 Production Leadtime (in Months): 5 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Contractor Team (Included in unit cost), PM Fielding Team LI 0962C50700 - Patriot Mods Army UNCLASSIFIED Page 31 of 42 Installation Quantity: 0 P-1 Line #21 Volume 1 - 253 === page 284 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 0962C50700 / Patriot Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 19 of 29: IFF Antenna Redesign Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Andover, MA Administrative Leadtime (in Months): 4 Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): PM Fielding Team (Included in Fielding cost) LI 0962C50700 - Patriot Mods Army Installation Quantity: 0 UNCLASSIFIED Page 32 of 42 P-1 Line #21 Volume 1 - 254 === page 285 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 0962C50700 / Patriot Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 20 of 29: Combined Crypto Modification Phase I (CCMPI) Manufacturer Information Manufacturer Name: OGA Manufacturer Location: N/A Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: LEAD Logistics Fielding Team (Included in unit cost) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 150 / 1.950 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 150 / 1.950 150 / 1.950 150 / 1.950 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 150 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 150 Out 150 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 150 LI 0962C50700 - Patriot Mods Army UNCLASSIFIED Page 33 of 42 P-1 Line #21 Volume 1 - 255 === page 286 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 0962C50700 / Patriot Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 21 of 29: Radar Digital Processor - Configuration (RDP-C) Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Andover, MA Administrative Leadtime (in Months): 8 Dates FY 2025 Production Leadtime (in Months): 20 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Depot, PM Office, contractor team (Included in unit cost) LI 0962C50700 - Patriot Mods Army Installation Quantity: 0 UNCLASSIFIED Page 34 of 42 P-1 Line #21 Volume 1 - 256 === page 287 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 0962C50700 / Patriot Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 22 of 29: Air Defense Artillery School Upgrades/ TADSS Manufacturer Information Manufacturer Name: PM Office, contractor team Manufacturer Location: Various Administrative Leadtime (in Months): 6 Dates FY 2025 Production Leadtime (in Months): 18 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): PM fielding team LI 0962C50700 - Patriot Mods Army Installation Quantity: 0 UNCLASSIFIED Page 35 of 42 P-1 Line #21 Volume 1 - 257 === page 288 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 0962C50700 / Patriot Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 23 of 29: Modern Manstation (MMS) Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Andover, MA Administrative Leadtime (in Months): 6 Dates FY 2025 Production Leadtime (in Months): 15 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Various (Included in unit cost) LI 0962C50700 - Patriot Mods Army Installation Quantity: 0 UNCLASSIFIED Page 36 of 42 P-1 Line #21 Volume 1 - 258 === page 289 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 0962C50700 / Patriot Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 24 of 29: Reconfigurable Table Top Trainers (RT3) Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Tewksbury, MA Administrative Leadtime (in Months): 3 Dates FY 2025 Production Leadtime (in Months): 9 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): PM Office, Contractor Team (Included in unit cost) LI 0962C50700 - Patriot Mods Army Installation Quantity: 0 UNCLASSIFIED Page 37 of 42 P-1 Line #21 Volume 1 - 259 === page 290 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 0962C50700 / Patriot Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 25 of 29: Assured PNT Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Tewksbury, MA Administrative Leadtime (in Months): 4 Dates FY 2025 Production Leadtime (in Months): 14 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Logistics Fielding Team (Included in unit cost) LI 0962C50700 - Patriot Mods Army Installation Quantity: 0 UNCLASSIFIED Page 38 of 42 P-1 Line #21 Volume 1 - 260 === page 291 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 0962C50700 / Patriot Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 26 of 29: Test Detachment Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 4 Dates FY 2025 Production Leadtime (in Months): 8 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): WSMR PM owned test bed personnel LI 0962C50700 - Patriot Mods Army Installation Quantity: 0 UNCLASSIFIED Page 39 of 42 P-1 Line #21 Volume 1 - 261 === page 292 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 0962C50700 / Patriot Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 27 of 29: Launcher Hardware Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Andover, MA Administrative Leadtime (in Months): 12 Dates FY 2025 Production Leadtime (in Months): 24 FY 2026 FY 2027 FY 2028 Contract Dates Apr 2026 Apr 2027 Apr 2028 Delivery Dates Apr 2029 Apr 2030 Apr 2031 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation (Organic): PM Office Contractor LI 0962C50700 - Patriot Mods Army Installation Quantity: 0 UNCLASSIFIED Page 40 of 42 P-1 Line #21 Volume 1 - 262 === page 293 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 0962C50700 / Patriot Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 28 of 29: Radar Replacement Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Andover MA Administrative Leadtime (in Months): 7 Dates FY 2025 Production Leadtime (in Months): 42 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): PM Office and Contractor LI 0962C50700 - Patriot Mods Army Installation Quantity: 0 UNCLASSIFIED Page 41 of 42 P-1 Line #21 Volume 1 - 263 === page 294 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 0962C50700 / Patriot Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C50700 / Patriot Mods MDAP/MAIS Code: Modification Item 29 of 29: ACM Readiness Priorities Manufacturer Information Manufacturer Name: Multiple Manufacturer Location: Multiple Administrative Leadtime (in Months): Dates Production Leadtime (in Months): FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Modification Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.000 4 / 0.000 Total - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 4 / 0.000 4 / 0.000 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4 4 Out - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4 4 LI 0962C50700 - Patriot Mods Army UNCLASSIFIED Page 42 of 42 P-1 Line #21 Volume 1 - 264 === page 295 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 2684C20000 / Stinger Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 03: Modification of Missiles / BSA 10: Modifications ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0203801A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 906.780 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 906.780 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 906.780 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 10.786 - 10.786 10.096 4.388 - - - 649.475 428.935 - - 649.475 428.935 - - 649.475 428.935 To FY 2031 Complete - - - - - - - - 10.786 - 10.786 10.096 4.388 - - - - - - - - - - - 10.786 - 10.786 10.096 4.388 - - - Total 2,010.460 2,010.460 2,010.460 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 5,397.500 776.884 759.177 1,281.364 Description: The Stinger Block I missile is an advanced, fire-and-forget, short-range, Soldier-portable, shoulder-fired and platform mounted guided missile system that provides the air defense protection for the maneuver force and point defense assets. Stinger's mission is to provide the force with low-altitude air defense against Fixed Wing (FW) and Rotary Wing (RW) Aircraft, Unmanned Aircraft Systems (UAS) and Cruise Missiles (CM). The Stinger missile is deployable from a variety of platforms that includes vehicles, helicopters and UAS. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 2684C20000 - Stinger Mods Army FY 2025 FY 2027 Base FY 2026 - 649.475 649.475 428.935 428.935 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - 10.786 - 10.786 10.096 4.388 - - - - - - - - - 10.786 - 10.786 10.096 4.388 - - UNCLASSIFIED Page 1 of 7 P-1 Line #22 Volume 1 - 265 === page 296 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 2684C20000 / Stinger Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 03: Modification of Missiles / BSA 10: Modifications ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0203801A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-3a C21300 / STINGER BLK I UPGRADES (Service Life Extension) P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code A Exhibits Schedule Exhibit Type Title* P-3a C21300 / STINGER BLK I UPGRADES (Service Life Extension) P-40 Total Gross/Weapon System Cost Subexhibits ID CD A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 906.780 - / 649.475 - / 428.935 - / 10.786 - / - - - / 906.780 - / 649.475 - / 428.935 - / 10.786 - / - - / 10.786 / 10.786 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 10.096 - / 4.388 - / - - / - - / - - / 2,010.460 - / 10.096 - / 4.388 - / - - / - - / - - / 2,010.460 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 funding of $10.786 million provides Acceptance Testing, Test Equipment Modernization, Engineering Services and Program Management support. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. https://pandr.altess.army.mil/#!/items LI 2684C20000 - Stinger Mods Army UNCLASSIFIED Page 2 of 7 P-1 Line #22 Volume 1 - 266 === page 297 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2684C20000 / Stinger Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 ID Code (A=Service Ready, B=Not Service Ready) : A Resource Summary Modification Number / Title: C21300 / STINGER BLK I UPGRADES MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) - Gross/Weapon System Cost ($ in Millions) 906.780 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 906.780 Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) 906.780 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 10.786 - 10.786 10.096 4.388 - - - 649.475 428.935 - - 649.475 428.935 - - 649.475 428.935 To FY 2031 Complete - - - - - - - - 10.786 - 10.786 10.096 4.388 - - - - - - - - - - - 10.786 - 10.786 10.096 4.388 - - - Total 2,010.460 2,010.460 2,010.460 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) 5,397.500 - - 776.884 759.177 - - - - - - - - - - - - - - - - 1,281.364 Description: The Stinger Block I missile is an advanced, fire-and-forget, short-range, Soldier-portable, shoulder-fired and platform mounted guided missile system that provides the air defense protection for the maneuver force and point defense assets. Stinger's mission is to provide the force with low-altitude air defense against Fixed Wing (FW) and Rotary Wing (RW) Aircraft, Unmanned Aircraft Systems (UAS) and Cruise Missiles (CM). The Stinger missile is deployable from a variety of platforms that includes vehicles, helicopters and UAS. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 2684C20000 - Stinger Mods Army FY 2025 FY 2027 Base FY 2026 - 649.475 649.475 428.935 428.935 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - 10.786 - 10.786 10.096 4.388 - - - - - - - - - 10.786 - 10.786 10.096 4.388 - - UNCLASSIFIED Page 3 of 7 P-1 Line #22 Volume 1 - 267 === page 298 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2684C20000 / Stinger Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: C21300 / STINGER BLK I UPGRADES MDAP/MAIS Code: Models of Systems Affected: FIM-92E Stinger Block I Modification Type: Service Life Extension Missile Prior Years Financial Plan FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 2: Stinger Service Life Extension Program (SLEP) A Kits Recurring Hardware 5,822 / 467.375 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 5,822 / 467.375 5,822 / 467.375 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 5,822 / 467.375 5,822 / 467.375 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 5,822 / 467.375 605 / 241.175 810 / 619.281 547 / 404.694 - / - - / - - / - - / - - / - - / - - / - - / - 1,962 / 1,265.150 Production Verification Flight Test Msls 13 / 6.250 12 / 20.369 18 / 13.311 - / - - / - - / - - / - - / - - / - - / - - / - 43 / 39.930 Dual Detector Assembly (DDA) 571 / 4.324 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 571 / 4.324 Stinger Gripstocks 264 / 43.864 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 264 / 43.864 - / - - / - Subtotal: Recurring Subtotal: Stinger Service Life Extension Program (SLEP) Modification Item 2 of 2: Stinger Block I Missiles A Kits Recurring Block I Missiles with Proximity Fuze Stinger Battery Cooling Units Subtotal: Recurring 396 / 7.905 1,849 / 303.518 - / - - / - - / - - / - - / - - / - - / - - / - 396 / 7.905 822 / 639.650 565 / 418.005 - / - - / - - / - - / - - / - - / - - / - - / - 3,236 / 1,361.173 Non-Recurring DDA Redesign - / 14.756 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 14.756 Production Capacity Increase - / 14.399 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 14.399 Engineering Services - / 26.003 - / 4.127 - / 4.130 - / 4.075 - / - - / 4.075 - / 3.815 - / 1.658 - / - - / - - / - - / 1.210 - / 0.798 - / 0.400 - / 0.395 - / - - / 0.395 - / 0.370 - / 0.161 - / - - / - - / - / 56.333 - / 0.706 - / 0.925 - / 0.913 - / - - / 0.913 - / 0.854 - / 0.371 - / - - / - - / - - / 11.646 - / 4.194 - / 5.475 - - / 5.403 - / 5.057 - - Acceptance Testing - Production Test Equipment - Government Management - / 43.808 - / 3.334 / 60.102 / 5.403 - / - / 2.198 - / - - / - - / - Roll Frequency Sensor Redesign - / 2.540 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 2.540 App. Spec. Int. Circ. Redesign - / 9.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 9.000 Subtotal: Non-Recurring Subtotal: Stinger Block I Missiles LI 2684C20000 - Stinger Mods Army - / 135.887 1,849 / 439.405 - / 9.825 822 / 649.475 / 10.930 - / 10.786 - / - - / 10.786 - / 10.096 - / 4.388 - / - - / - - / - 565 / 428.935 - / 10.786 - / - - / 10.786 - / 10.096 - / 4.388 - / - - / - - / - - UNCLASSIFIED Page 4 of 7 P-1 Line #22 - / 33.973 / 181.912 3,236 / 1,543.085 Volume 1 - 268 === page 299 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2684C20000 / Stinger Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: C21300 / STINGER BLK I UPGRADES MDAP/MAIS Code: Models of Systems Affected: FIM-92E Stinger Block I Modification Type: Service Life Extension Missile Prior Years Financial Plan Subtotal: Procurement, All Modification Items FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) 7,671 / 906.780 822 / 649.475 565 / 428.935 - / 10.786 - / - / - - / - - / 10.786 - / 10.096 - / 4.388 - / - - / - - / - / - - / - - / - - / - 9,058 / 2,010.460 Installation Subtotal: Installation - / - - / - - / - - - / - - / - - - / - Total Total Cost (Procurement + Support + Installation) LI 2684C20000 - Stinger Mods Army 906.780 649.475 428.935 10.786 - UNCLASSIFIED Page 5 of 7 10.786 10.096 4.388 P-1 Line #22 - - - 2,010.460 Volume 1 - 269 === page 300 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 2684C20000 / Stinger Mods ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: C21300 / STINGER BLK I UPGRADES MDAP/MAIS Code: Modification Item 1 of 2: Stinger Service Life Extension Program (SLEP) Manufacturer Information Manufacturer Name: McAlester Army Ammunition Plant Manufacturer Location: McAlester, OK Administrative Leadtime (in Months): 3 Dates FY 2025 Production Leadtime (in Months): 15 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Depot Installation LI 2684C20000 - Stinger Mods Army Installation Quantity: 5822 UNCLASSIFIED Page 6 of 7 P-1 Line #22 Volume 1 - 270 === page 301 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 2684C20000 / Stinger Mods ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: C21300 / STINGER BLK I UPGRADES MDAP/MAIS Code: Modification Item 2 of 2: Stinger Block I Missiles Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Tucson, Arizona Administrative Leadtime (in Months): Production Leadtime (in Months): 61 Dates FY 2025 FY 2026 Contract Dates Mar 2025 Dec 2025 Delivery Dates Apr 2030 Feb 2030 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation (Organic): N/A LI 2684C20000 - Stinger Mods Army Installation Quantity: 0 UNCLASSIFIED Page 7 of 7 P-1 Line #22 Volume 1 - 271 === page 302 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 2690CE8710 / AVENGER MODS Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 03: Modification of Missiles / BSA 10: Modifications ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0203801A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 254.332 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 254.332 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 254.332 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 2.321 - 6.823 - 6.823 5.051 5.051 3.010 3.037 - - - - - - - - - - - 2.321 - 6.823 - 6.823 5.051 5.051 3.010 3.037 - - - - - - - - - - - 2.321 - 6.823 - 6.823 5.051 5.051 3.010 3.037 - Total 279.625 279.625 279.625 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Avenger is a lightweight, ground-to-air missile and gun weapon system mounted on a High Mobility Multi-Purpose Wheeled Vehicle (HMMWV). The system is designed to protect against unmanned aircraft systems (UAS), cruise missiles, and fixed- and rotary-wing threats. The Avenger provides day/night and adverse weather operational capabilities, shoot-on-the-move functionality, rapid target engagement, and remote firing capability. It is highly mobile, capable of being air-dropped, helicopter-lifted, and air-transportable. The system employs up to eight Stinger missiles to counter aerial threats and is equipped with an M3P .50 Caliber Machine Gun for close-in ground and air defense. An Identification Friend or Foe (IFF) system is integrated to aid in identifying friendly aircraft, minimizing the risk of fratricide. The Avenger fleet consists of 421 systems, including 169 systems equipped with a digital Slew-to-Cue (STC) capability, which enhances target detection and engagement speed. The Avenger Modification - Service Life Extension Program (MOD-SLEP) consists of Project 038: Avenger Production Improvement Program (PIP) and Program Element CE8710: Avenger MODS. The ongoing MOD-SLEP addresses obsolescence of Avenger components to ensure Avenger maintains operational capability through the end of its economic useful life. Key MOD-SLEP components are the Targeting Console (TC), the M3P, the Avenger Fire Control Computer (AFCC), the Mode 5 Identification Friend or Foe (IFF), the Vehicle Internal Communications (VIC-5) and the Assured Positioning Navigation and Timing (A-PNT) hardware, which will provide M-Code capability. The TC and AFCC are fielded to the STC Avengers only. The M3P will be fielded through attrition. The VIC-5, Mode 5 IFF and A-PNT hardware are fielded to all 421 of the Avenger systems. Secondary Distribution Army Quantity Total Obligation Authority ANG Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 2690CE8710 - AVENGER MODS Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 0.842 - 6.823 - 6.823 5.051 5.051 3.010 3.037 - - - - - - - - - 1.479 - - - - - - - - - - - - - - - - - 2.321 - 6.823 - 6.823 5.051 5.051 3.010 3.037 UNCLASSIFIED Page 1 of 13 P-1 Line #23 Volume 1 - 272 === page 303 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 2690CE8710 / AVENGER MODS Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 03: Modification of Missiles / BSA 10: Modifications ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0203801A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-3a CE8710 / AVENGER MODS (Operational) P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code A Exhibits Schedule Exhibit Type Title* P-3a CE8710 / AVENGER MODS (Operational) P-40 Total Gross/Weapon System Cost Subexhibits ID CD A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 254.332 - / 2.321 - / - - / 6.823 - / - - - / 254.332 - / 2.321 - / - - / 6.823 - / - - / 6.823 / 6.823 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 5.051 - / 5.051 - / 3.010 - / 3.037 - / - - / 279.625 - / 5.051 - / 5.051 - / 3.010 - / 3.037 - / - - / 279.625 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 funding of $6.823 million is for continuation of engineering services and program management support to ensure the system maintains its operational capability throughout its Economic Useful Life (EUL). In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 2690CE8710 - AVENGER MODS Army UNCLASSIFIED Page 2 of 13 P-1 Line #23 Volume 1 - 273 === page 304 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 2690CE8710 / AVENGER MODS ID Code (A=Service Ready, B=Not Service Ready) : A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: CE8710 / AVENGER MODS MDAP/MAIS Code: Prior Years 254.332 254.332 254.332 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 2.321 - 6.823 - 6.823 5.051 5.051 3.010 3.037 - - - - - - - - - - - 2.321 - 6.823 - 6.823 5.051 5.051 3.010 3.037 - - - - - - - - - - - 2.321 - 6.823 - 6.823 5.051 5.051 3.010 3.037 - Total 279.625 279.625 279.625 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Avenger is a lightweight, ground-to-air missile and gun weapon system mounted on a High Mobility Multi-Purpose Wheeled Vehicle (HMMWV). The system is designed to protect against unmanned aircraft systems (UAS), cruise missiles, and fixed- and rotary-wing threats. The Avenger provides day/night and adverse weather operational capabilities, shoot-on-the-move functionality, rapid target engagement, and remote firing capability. It is highly mobile, capable of being air-dropped, helicopter-lifted, and air-transportable. The system employs up to eight Stinger missiles to counter aerial threats and is equipped with an M3P .50 Caliber Machine Gun for close-in ground and air defense. An Identification Friend or Foe (IFF) system is integrated to aid in identifying friendly aircraft, minimizing the risk of fratricide. The Avenger fleet consists of 421 systems, including 169 systems equipped with a digital Slew-to-Cue (STC) capability, which enhances target detection and engagement speed. The Avenger Modification - Service Life Extension Program (MOD-SLEP) addresses the obsolescence of key Avenger components to ensure the system maintains its operational capability throughout its Economic Useful Life (EUL). The Vehicle Internal Communications System (VIC) is a critical subsystem that facilitates communication between the gunner and driver. Additionally, it interfaces with the Identification Friend or Foe (IFF) system and missile electronics, enhancing IFF capabilities. The digital VIC-5 system replaced the analog VIC-1 system, providing improved functionality and performance. The Avenger Fire Control Computer (AFCC) is a critical subsystem of the Avenger Slew-to-Cue system, responsible for processing and displaying air track data to the gunner. To address this, the AFCC underwent software and hardware upgrades to enhance its capabilities. These upgrades enable the system to handle increased targeting capabilities provided by the latest version of the FAAD early warning system, ensure compliance with the latest Information Assurance (IA) requirements, and support future growth in areas such as improved fire control and longer-range engagements. The Mode 5 Identification Friend or Foe (IFF) system replaced the Mode 4 IFF system to comply with Department of War standards. Incorporating Mode 5 IFF into the Avenger system is critical for retaining cooperative target identification capabilities, ensuring the Avenger remains relevant and effective in Air Defense and Homeland Defense missions. Additionally, Mode 5 IFF quantities exceeding 421 for the Avenger systems will support the requirements of the Stinger Man-Portable Air Defense System (MANPADS). The Assured Positioning, Navigation, and Timing (A-PNT) hardware will equip the Avenger system with M-Code capability by 1QFY2027. The Targeting Console (TC) and AFCC are fielded exclusively to the 169 Slew-to-Cue (STC) Avenger systems. The M3P .50 Caliber Machine Gun is fielded through attrition through the supply system. The VIC-5, Mode 5 IFF, and A-PNT hardware are fielded to all 421 Avenger systems. In previous years, the Avenger MODS program also addressed upgrades to the Slew-to-Cue system, TC, and M3P .50 Caliber Machine Gun. LI 2690CE8710 - AVENGER MODS Army UNCLASSIFIED Page 3 of 13 P-1 Line #23 Volume 1 - 274 === page 305 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 2690CE8710 / AVENGER MODS ID Code (A=Service Ready, B=Not Service Ready) : A Secondary Distribution Army Quantity Total Obligation Authority ANG Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 2690CE8710 - AVENGER MODS Army Modification Number / Title: CE8710 / AVENGER MODS MDAP/MAIS Code: FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 0.842 - 6.823 - 6.823 5.051 5.051 3.010 3.037 - - - - - - - - - 1.479 - - - - - - - - - - - - - - - - - 2.321 - 6.823 - 6.823 5.051 5.051 3.010 3.037 UNCLASSIFIED Page 4 of 13 P-1 Line #23 Volume 1 - 275 === page 306 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2690CE8710 / AVENGER MODS Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 ID Code (A=Service Ready, B=Not Service Ready) : A MDAP/MAIS Code: Models of Systems Affected: Avenger Basic and Slew-to-Cue Systems Prior Years Financial Plan Modification Number / Title: CE8710 / AVENGER MODS Modification Type: Operational FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 6: Prior Modifications A Kits Recurring 466 / 67.153 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 466 / 67.153 Subtotal: Recurring Prior Year Modifications 466 / 67.153 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 466 / 67.153 Subtotal: Prior Modifications 466 / 67.153 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 466 / 67.153 Hardware 454 / 4.327 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 454 / 4.327 Spares - / 0.457 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.457 Engineering Services - / 0.445 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.445 Systems Engineering / Program Management - / 3.182 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 3.182 Fielding - / 0.420 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.420 454 / 8.831 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 454 / 8.831 264 / 11.880 264 / 11.880 Modification Item 2 of 6: Vehicle Internal Communication (VIC-5) A Kits Recurring Subtotal: Recurring B Kits Recurring Avenger to VIC 5 Cables - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Spares - / 1.188 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1.188 Engineering Services - / 1.487 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1.487 Systems Engineering / Program Management - / 3.046 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 3.046 Fielding - / 1.255 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1.255 264 / 18.856 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 264 / 18.856 718 / 27.687 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 718 / 27.687 724 / 66.523 - / - - / - / 1.268 - / - / 1.268 - / - - / - - / - - / - - / - 724 / 67.791 - / - - / - / - - / - / - - / - - / - - / - - / - - / - Subtotal: Recurring Subtotal: Vehicle Internal Communication (VIC-5) Modification Item 3 of 6: Mode 5/Identification Friend or Foe A Kits Recurring Equipment Spares LI 2690CE8710 - AVENGER MODS Army - / 7.028 - UNCLASSIFIED Page 5 of 13 - P-1 Line #23 - / 7.028 Volume 1 - 276 === page 307 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2690CE8710 / AVENGER MODS Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 ID Code (A=Service Ready, B=Not Service Ready) : A MDAP/MAIS Code: Models of Systems Affected: Avenger Basic and Slew-to-Cue Systems Prior Years Financial Plan - FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total / 6.600 - / - - / - - / 1.115 - / - - / 1.115 / 19.266 - / - - / - - / 4.440 - / - - / 4.440 / 5.868 - / - - / - / - - / - 724 / 105.285 - / - - / - / 6.823 - / - - Fielding Subtotal: Recurring Modification Type: Operational FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Engineering Services System Engineering / Program Management Modification Number / Title: CE8710 / AVENGER MODS - - - - / 4.532 - - / - / 4.531 - / 3.037 - / - - / - - / - - / - - / - - - / - - / - - / - / 3.037 - / - / - - / 0.519 - / 0.520 / 6.823 - / 5.051 - / 5.051 - / 3.010 / 3.010 - - - / 22.825 / 23.706 - / 6.907 724 / 128.257 Non-Recurring Non-Recurring Production - / 10.197 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 10.197 Subtotal: Non-Recurring - / 10.197 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 10.197 724 / 115.482 - / - - / - / 6.823 - / - / 3.037 - / - 724 / 138.454 170 / 21.545 170 / 21.545 Subtotal: Mode 5/Identification Friend or Foe - / 6.823 - / 5.051 - / 5.051 - / 3.010 - - Modification Item 4 of 6: Avenger Fire Control Computer A Kits Recurring Hardware - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Spares - / 2.155 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 2.155 Engineering Services - / 2.996 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 2.996 Systems Engineering / Program Management - / 5.892 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 5.892 Fielding - / 2.108 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 2.108 170 / 34.696 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 170 / 34.696 170 / 34.696 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 170 / 34.696 Hardware 206 / 4.907 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 206 / 4.907 Engineering Services - / 0.167 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.167 Systems Engineering / Program Management - / 0.248 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.248 Fielding - / 0.214 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.214 206 / 5.536 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 206 / 5.536 206 / 5.536 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 206 / 5.536 Subtotal: Recurring Subtotal: Avenger Fire Control Computer Modification Item 5 of 6: Obsolescence Mitigation Items A Kits Recurring Subtotal: Recurring Subtotal: Obsolescence Mitigation Items Modification Item 6 of 6: Assured Positioning Navigation and Timing hardware kits A Kits LI 2690CE8710 - AVENGER MODS Army UNCLASSIFIED Page 6 of 13 P-1 Line #23 Volume 1 - 277 === page 308 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2690CE8710 / AVENGER MODS Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 ID Code (A=Service Ready, B=Not Service Ready) : A MDAP/MAIS Code: Models of Systems Affected: Avenger Basic and Slew-to-Cue Systems Prior Years Financial Plan Modification Number / Title: CE8710 / AVENGER MODS Modification Type: Operational FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Recurring Hardware - / 0.295 - / - - / - - / - - / - - / - - / - - / - - / - - / - 101 / 4.073 Engineering Services - / - - / 0.800 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.800 Systems Engineering / Program Management - / - - / 0.768 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.768 Fielding - / - - / 0.458 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.458 101 / 3.778 - / 2.321 - / - - / - - / - - / - - / - - / - - / - - / - - / - 101 / 6.099 101 / 3.778 - / 2.321 - / - - / - - / - - / - - / - - / - - / - - / - - / - 101 / 6.099 2,385 / 254.332 - / 2.321 - / - / 6.823 - / - / 3.037 - / - 2,385 / 279.625 / - - / - / - - / - / - - / - - Subtotal: Recurring Subtotal: Assured Positioning Navigation and Timing hardware kits Subtotal: Procurement, All Modification Items 101 / 3.778 - / 6.823 - / 5.051 - / 5.051 - / 3.010 - - Installation Subtotal: Installation - / - - - - / - - / - - / - - / - - / - Total Total Cost (Procurement + Support + Installation) LI 2690CE8710 - AVENGER MODS Army 254.332 2.321 - 6.823 - UNCLASSIFIED Page 7 of 13 6.823 5.051 5.051 P-1 Line #23 3.010 3.037 - 279.625 Volume 1 - 278 === page 309 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 2690CE8710 / AVENGER MODS ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: CE8710 / AVENGER MODS MDAP/MAIS Code: Modification Item 1 of 6: Prior Modifications Manufacturer Information Manufacturer Name: Not Applicable Manufacturer Location: Not Applicable Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Completed at Depot LI 2690CE8710 - AVENGER MODS Army Installation Quantity: 466 UNCLASSIFIED Page 8 of 13 P-1 Line #23 Volume 1 - 279 === page 310 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 2690CE8710 / AVENGER MODS ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: CE8710 / AVENGER MODS MDAP/MAIS Code: Modification Item 2 of 6: Vehicle Internal Communication (VIC-5) Manufacturer Information Manufacturer Name: Northrop Grumman Manufacturer Location: Tobyhanna, PA Administrative Leadtime (in Months): 1 Dates FY 2025 Production Leadtime (in Months): 9 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Fielded by Depot with Phase II kit LI 2690CE8710 - AVENGER MODS Army Installation Quantity: 453 UNCLASSIFIED Page 9 of 13 P-1 Line #23 Volume 1 - 280 === page 311 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 2690CE8710 / AVENGER MODS ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: CE8710 / AVENGER MODS MDAP/MAIS Code: Modification Item 3 of 6: Mode 5/Identification Friend or Foe Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Largo, FL Administrative Leadtime (in Months): 4 Dates FY 2025 Production Leadtime (in Months): 12 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Fielded by Depot with Phase II kit LI 2690CE8710 - AVENGER MODS Army Installation Quantity: 724 UNCLASSIFIED Page 10 of 13 P-1 Line #23 Volume 1 - 281 === page 312 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 2690CE8710 / AVENGER MODS ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: CE8710 / AVENGER MODS MDAP/MAIS Code: Modification Item 4 of 6: Avenger Fire Control Computer Manufacturer Information Manufacturer Name: Boeing Manufacturer Location: Huntsville, AL Administrative Leadtime (in Months): 1 Dates FY 2025 Production Leadtime (in Months): 9 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Fielded by Depot with Phase II kit LI 2690CE8710 - AVENGER MODS Army Installation Quantity: 169 UNCLASSIFIED Page 11 of 13 P-1 Line #23 Volume 1 - 282 === page 313 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 2690CE8710 / AVENGER MODS ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: CE8710 / AVENGER MODS MDAP/MAIS Code: Modification Item 5 of 6: Obsolescence Mitigation Items Manufacturer Information Manufacturer Name: Varies Manufacturer Location: Varies Administrative Leadtime (in Months): 6 Dates FY 2025 Production Leadtime (in Months): 6 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Fielded by Depot LI 2690CE8710 - AVENGER MODS Army Installation Quantity: 169 UNCLASSIFIED Page 12 of 13 P-1 Line #23 Volume 1 - 283 === page 314 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 2690CE8710 / AVENGER MODS ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: CE8710 / AVENGER MODS MDAP/MAIS Code: Modification Item 6 of 6: Assured Positioning Navigation and Timing hardware kits Manufacturer Information Manufacturer Name: GPS Source Inc. Manufacturer Location: Colorado Springs, CO Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): 12 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Fielded by Depot teams LI 2690CE8710 - AVENGER MODS Army Installation Quantity: 101 UNCLASSIFIED Page 13 of 13 P-1 Line #23 Volume 1 - 284 === page 315 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 6552C67500 / MLRS Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 03: Modification of Missiles / BSA 10: Modifications Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0603778A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 2,416.099 2,416.099 2,416.099 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 320.591 320.591 320.591 243.470 243.470 243.470 289.496 - - 289.496 - - 289.496 - 289.496 289.496 289.496 289.782 289.782 289.782 295.560 295.560 295.560 302.374 302.374 302.374 To FY 2031 Complete - Continuing - Total - Continuing Continuing Continuing - - - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The M270A2 Multiple Launch Rocket System (MLRS) launcher is a full-spectrum, combat-proven, all-weather, 24/7 lethal and responsive, precision strike weapon system. MLRS launchers support the Army's Long Range Precision Fires modernization effort. MLRS provides critical missile precision strike, operational shaping fires, counterfire, and close support destructive and suppressive fires. MLRS is a tracked, indirect fire, rocket/missile launcher capable of firing two pods of precision rockets/missiles from the current Multiple Launch Rocket System (MLRS) Family of Munitions (MFOM) including the Guided Multiple Launch Rocket System (GMLRS) and the Army Tactical Missile System (ATACMS), the Precision Strike Missile (PrSM), and future MFOM to include the Extended Range GMLRS (ER-GMLRS). MLRS launchers support Integrated Fires and Multi-Domain Operations. MOD 2 (MLRS Fleet Upgrade). The MLRS selective upgrade effort inducts M270A1s launchers into the modification line at Red River Army Depot, Texas and modifies them to M270A2s by adding the Improved Armored Cab (IAC Cab) (MOD 3), applying common Bradley chassis modifications, adding the Common Fire Control System (CFCS) with associated CFCS diagnostic tools. MOD 3 (Improved Armored Cab). The IAC Cab Modification Kit provides increased crew survivability over the M270A1 cab. Upon integration of the IAC Modification Kit on a M270A1, the launcher permanently becomes a M270A2. Red River Army Depot performs the integration of the IAC under a Public Private Partnership as part of the MLRS Fleet Upgrade (MOD 2) efforts. MOD 4 (APNT). (Assured Position, Navigation and Timing (APNT). MOD 4 APNT modernization retrofits 219 M270A2 MLRS launchers produced prior to FY 2029 with Digital Anti-Jam Receiver (DIGAR) kits, NavStrike-M, and APNT Launcher Adapter Group (LAG) kits. APNT LAG Kit is a tool used to diagnose APNT issues. This modernization advances the APNT posture to address the evolving threat environment from near-peer adversaries. Funding for MOD 4 begins in FY 2027. MOD 5 (MLRS MODS). The Bradley chassis obsolescence mitigation cost element maintains commonality with the Bradley carrier. Fire control system cost element addresses parts obsolescence for continued production. This element includes CFCS obsolescence program referred to as CFCS Block III. Government testing verifies items such as production quality, APNT functionality, and chassis modification effectiveness. The other three cost elements are Logistics-related mods, Product Integration Support, and Software Integration Support. Logistics-related mods support critical logistics functions to update Interactive Electronic Technical Manuals, procure system-specific training devices required to support the MLRS Vehicle and Maintainer training, and support maintaining and preparation of launchers for fielding, overhaul, reset and test activities. Product integration support includes launcher stakeholder support such as Aviation and Missile Command safety support, Tank-Automotive and Armaments Command support, and field service representative support at Red River Army Depot for engines and transmissions. Software integration includes engineering activities to sustain software to ensure it remains viable and updates training documentation. LI 6552C67500 - MLRS Mods Army UNCLASSIFIED Page 1 of 13 P-1 Line #24 Volume 1 - 285 === page 316 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 03: Modification of Missiles / BSA 10: Modifications ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 6552C67500 / MLRS Mods Program Elements for Code B Items: N/A Other Related Program Elements: 0603778A Line Item MDAP/MAIS Code: N/A The Army Acquisition Objective (AAO) is 347 MLRS launchers. LI 6552C67500 - MLRS Mods Army UNCLASSIFIED Page 2 of 13 P-1 Line #24 Volume 1 - 286 === page 317 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 6552C67500 / MLRS Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 03: Modification of Missiles / BSA 10: Modifications ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: 0603778A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a C67500 / MLRS Mods (.) - / 2,416.099 - / 320.591 - / 243.470 - / 289.496 - / - - P-40 Total Gross/Weapon System Cost - / 2,416.099 - / 320.591 - / 243.470 - / 289.496 - / - - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code / 289.496 / 289.496 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a C67500 / MLRS Mods (.) - / 289.782 - / 295.560 - / 302.374 - / - Continuing Continuing P-40 Total Gross/Weapon System Cost - / 289.782 - / 295.560 - / 302.374 - / - Continuing Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 procurement dollars in the amount of $289.496 million provides modifications which result in 25 M270A2 MLRS launchers. MOD 2. Upgrades 25 M270A1 launchers to M270A2. The MLRS Fleet Upgrade effort continues by upgrading the current fleet of M270A1 launchers to M270A2 launchers addressing Bradley commonality, fire control system (FCS) hardware obsolescence, CFCS Launcher Adapter Group (LAG) kits, and application of Improved Armored Cabs MOD Kits (MOD 3). Beginning in FY 2025, adjustments were made to fielding cost element to highlight the purchase of fielding spares to support future fieldings. All other fielding costs are labeled in the logistics-related Mods line of MOD 5. To provide budget transparency, MOD 2 captures CFCS LAG kit purchases as a distinctive cost element under MOD 2 versus obsolescence mitigation measures associated with MOD 5. MOD 3. Procures 25 Improved Armored Cabs (IACs) supporting ongoing M270A2 launcher production, production line replenishment, and initial spares for provisioning. The IAC improves survivability of the crew. Application of MOD 2 and MOD 3 to an M270A1 results in a M270A2 Launcher. MOD 4. This MOD begins funding in FY 2027 to procure 27 sets of DIGAR kits, the PNA-M, and 9 APNT diagnostic kits in support of APNT modernization efforts. MOD 5. MLRS MODS funding updates the Bradley carrier drawing packages and Technical Data Packages through the prime contractor and the government product office; updates the Interactive Electronic Technical Manuals for Soldiers to perform operator maintenance. Systems engineering efforts will address obsolescence issues and apply necessary modifications to the major MLRS components of the carrier. Common Fire Control System (CFCS) obsolescence mitigation replaces obsolete components. Product Integration supports launchers that are transitioning from production and/or overhaul back to units, reset activities and maintaining launchers in the test fleet to support critical test activities. Software integration supports modifications to the MLRS launcher to meet the current and evolving threat. FY 2027 MLRS Mods funding increase of $46.026 million procures two additional launchers (MOD 2), initial spares, equipment for fielding, and initial spares for IAC (MOD 3). The Army intends to convert any price advantage created through contract negotiations, other service procurement, and international cooperative partnerships to continue the MLRS Fleet Upgrade (MOD 2) of MLRS launchers from M270A1 configuration to M270A2 configuration, and/or address obsolescence, modernization, cost reduction, and production initiatives. The Army will continue to incorporate modifications with the MLRS launcher to keep pace with the current and evolving threats. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 6552C67500 - MLRS Mods Army UNCLASSIFIED Page 3 of 13 P-1 Line #24 Volume 1 - 287 === page 318 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 03: Modification of Missiles / BSA 10: Modifications ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 6552C67500 / MLRS Mods Program Elements for Code B Items: N/A Other Related Program Elements: 0603778A Line Item MDAP/MAIS Code: N/A LI 6552C67500 - MLRS Mods Army UNCLASSIFIED Page 4 of 13 P-1 Line #24 Volume 1 - 288 === page 319 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 6552C67500 / MLRS Mods ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: C67500 / MLRS Mods MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 2,416.099 320.591 2,416.099 320.591 2,416.099 320.591 243.470 243.470 243.470 289.496 - - 289.496 - - 289.496 - 289.496 289.496 289.496 289.782 289.782 289.782 295.560 295.560 295.560 302.374 302.374 302.374 To FY 2031 Complete - Continuing - Total - Continuing Continuing Continuing - - - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The M270A2 Multiple Launch Rocket System (MLRS) launcher is a full-spectrum, combat-proven, all-weather, 24/7 lethal and responsive, precision strike weapon system. MLRS launchers support the Army's Long Range Precision Fires modernization effort. MLRS provides critical missile precision strike, operational shaping fires, counterfire, and close support destructive and suppressive fires. MLRS is a tracked, indirect fire, rocket/missile launcher capable of firing two pods of precision rockets/missiles from the current Multiple Launch Rocket System (MLRS) Family of Munitions (MFOM) including the Guided Multiple Launch Rocket System (GMLRS) and the Army Tactical Missile System (ATACMS), the Precision Strike Missile (PrSM), and future MFOM to include the Extended Range GMLRS (ER-GMLRS). MLRS launchers support Integrated Fires and Multi-Domain Operations. MOD 2 (MLRS Fleet Upgrade). The MLRS selective upgrade effort inducts M270A1s launchers into the modification line at Red River Army Depot, Texas and modifies them to M270A2s by adding the Improved Armored Cab (IAC Cab) (MOD 3), applying common Bradley chassis modifications, adding the Common Fire Control System (CFCS) with associated CFCS diagnostic tools. MOD 3 (Improved Armored Cab). The IAC Cab Modification Kit provides increased crew survivability over the M270A1 cab. Upon integration of the IAC Modification Kit on a M270A1, the launcher permanently becomes a M270A2. Red River Army Depot performs the integration of the IAC under a Public Private Partnership as part of the MLRS Fleet Upgrade (MOD 2) efforts. MOD 4 (APNT). (Assured Position, Navigation and Timing (APNT). MOD 4 APNT modernization retrofits 219 M270A2 MLRS launchers produced prior to FY 2029 with Digital Anti-Jam Receiver (DIGAR) kits, NavStrike-M, and APNT Launcher Adapter Group (LAG) kits. This modernization advances the APNT posture to address the evolving threat environment from near-peer adversaries. Funding for MOD 4 begins in FY 2027. MOD 5 (MLRS MODS). The Bradley chassis obsolescence mitigation cost element maintains commonality with the Bradley carrier. Fire control system cost element addresses parts obsolescence for continued production. This element includes CFCS obsolescence program referred to as CFCS Block III. Government testing verifies items such as production quality, APNT functionality, and chassis modification effectiveness. The other three cost elements are Logistics-related mods, Product Integration Support, and Software Integration Support. Logistics-related mods support critical logistics functions to update Interactive Electronic Technical Manuals, procure system-specific training devices required to support the MLRS Vehicle and Maintainer training, and support maintaining and preparation of launchers for fielding, overhaul, reset and test activities. Product integration support includes launcher stakeholder support such as Aviation and Missile Command safety support, Tank-Automotive and Armaments Command support, and field service representative support at Red River Army Depot for engines and transmissions. Software integration includes engineering activities to sustain software to ensure it remains viable and updates training documentation. The Army Acquisition Objective (AAO) is 347 MLRS launchers. LI 6552C67500 - MLRS Mods Army UNCLASSIFIED Page 5 of 13 P-1 Line #24 Volume 1 - 289 === page 320 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 6552C67500 / MLRS Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: M270A1 Modification Type: . Prior Years Financial Plan Modification Number / Title: C67500 / MLRS Mods FY 2025 FY 2026 Related RDT&E PEs: FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 5: MLRS Fleet Expansion A Kits Recurring Obsolescence Mitigation (inactive) / 458.873 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - System Engineering Program Management - / 74.515 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 74.515 Transmissions and Engines - / 68.310 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 68.310 160 / 1,035.406 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - M270A2 Launcher Fleet Expansion - - / 458.873 160 / 1,035.406 Fielding - / 8.822 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 8.822 Training - / 4.057 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 4.057 160 / 1,649.983 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Subtotal: Recurring 160 / 1,649.983 Non-Recurring Obsolescence Mitigation Bradley Chassis - / 53.338 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 53.338 Obsolescence Mitigation Fire Control Sys - / 28.387 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 28.387 Launcher Risk Reduction - / 17.417 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 4.875 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 29.701 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Government Testing - Initial Spares - Training Subtotal: Non-Recurring Subtotal: MLRS Fleet Expansion - / 8.602 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 142.320 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 160 / 1,792.303 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 17.417 - - / 4.875 / 29.701 - / 8.602 / 142.320 - 160 / 1,792.303 Modification Item 2 of 5: MLRS Fleet Upgrade A Kits Recurring System Engineering Program Management - / 38.188 - / 17.003 - / 17.390 - / 17.755 - / - - / 17.755 - / 18.128 - / 18.509 - / 18.897 - / - Continuing Continuing Transmissions and Engines - / 24.579 - / 16.983 - / 14.456 - / 15.940 - / - - / 15.940 - / 16.877 - / 16.616 - / 18.222 - / - Continuing Continuing M270A2 Launcher Upgrade 43 / 272.058 24 / 208.112 23 / 155.127 25 / 184.913 - / - 25 / 184.913 27 / 210.150 - / - Continuing Continuing CFCS LAG Kits 71 / 11.735 10 / 1.870 8 / 1.512 18 / 3.474 - / - 18 / 3.474 - / - Fielding - / 7.417 - / 6.025 - / - - / 6.291 - / - - / 6.291 - / - Training - / 3.651 - / 0.698 / 1.072 - / 0.365 - / - - / 0.365 / 0.372 43 / 228.738 - / - Subtotal: Recurring 114 / 357.628 34 / 250.691 - 31 / 189.557 43 / 228.738 26 / 195.212 - 26 / 230.589 25 / 192.760 - / - - / - - / - Continuing Continuing - / 6.558 - / - - / - Continuing Continuing - / 0.380 / 0.388 - / - Continuing Continuing 27 / 247.657 - / - Continuing Continuing 25 / 234.823 - Non-Recurring Obsolescence Mitigation Bradley Chassis - / 14.832 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 14.832 Obsolescence Mitigation Fire Control Sys - / 11.768 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 11.768 LI 6552C67500 - MLRS Mods Army UNCLASSIFIED Page 6 of 13 P-1 Line #24 Volume 1 - 290 === page 321 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 6552C67500 / MLRS Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: M270A1 Modification Type: . Prior Years Financial Plan Subtotal: MLRS Fleet Upgrade FY 2025 FY 2026 Related RDT&E PEs: FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Government Testing Subtotal: Non-Recurring Modification Number / Title: C67500 / MLRS Mods - / 2.189 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 28.789 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 2.189 / 28.789 114 / 386.417 34 / 250.691 31 / 189.557 43 / 228.738 - / - 43 / 228.738 26 / 230.589 25 / 234.823 27 / 247.657 - / - Continuing Continuing Production 248 / 230.034 24 / 32.566 23 / 26.636 25 / 34.094 - / - 25 / 34.094 26 / 32.324 25 / 35.541 27 / 34.992 - / - Continuing Continuing IAC Spares 5 / 7.345 - - - / 3.164 - / - - - - - / - Continuing Continuing Modification Item 3 of 5: Improved Armored Cab (IAC) A Kits Recurring Subtotal: Recurring Subtotal: Improved Armored Cab (IAC) / 8.917 / 2.680 / 3.164 / 2.984 / 3.500 - / - 253 / 237.379 24 / 41.483 23 / 29.316 25 / 37.258 - / - 25 / 37.258 26 / 35.308 25 / 39.041 27 / 34.992 - / - Continuing Continuing 253 / 237.379 24 / 41.483 23 / 29.316 25 / 37.258 - / - 25 / 37.258 26 / 35.308 25 / 39.041 27 / 34.992 - / - Continuing Continuing Modification Item 4 of 5: APNT A Kits Recurring DIGAR Kits - / - - / - - / - 27 / 3.939 - / - 27 / 3.939 27 / 4.019 27 / 4.099 27 / 4.181 - / - Continuing Continuing NavStrike-M Kits - / - - / - - / - 27 / 0.253 - / - 27 / 0.253 27 / 0.258 27 / 0.264 27 / 0.269 - / - Continuing Continuing Assured PNT (APNT) LAG Kits - / - - / - - / - 9 / 0.270 - / - 9 / 0.270 9 / 0.275 9 / 0.281 9 / 0.286 - / - Continuing Continuing - / - - / - - / - 63 / 4.462 - / - 63 / 4.462 63 / 4.552 63 / 4.644 63 / 4.736 - / - Continuing Continuing - / - - / - - / - 63 / 4.462 - / - 63 / 4.462 63 / 4.552 63 / 4.644 63 / 4.736 - / - Continuing Continuing Obsolescence Mitigation Bradley Chassis - / - - / 4.064 - / 3.406 - / 2.873 - / - - / 2.873 - / 2.847 - / 2.880 - / 2.643 - / - Continuing Continuing Obsolescence Mitigation Fire Control Sys - / - - / 3.474 - / 3.350 - / 3.400 - / - - / 3.400 - / 3.225 - / 1.577 - / 1.455 - / - Continuing Continuing Government Testing - / - - / 1.443 - / 1.425 - / 1.307 - / - - / 1.307 - / 1.689 - / 1.579 - / 1.503 - / - Continuing Continuing Logistics-related Mods - / - - / 4.986 - / 4.492 - / 4.013 - / - - / 4.013 - / 4.251 - / 4.132 - / 3.419 - / - Continuing Continuing Product Integration Support - / - - / 4.276 - / 3.230 - / 2.565 - / - - / 2.565 - / 2.194 - / 2.069 - / 2.056 - / - Continuing Continuing Software Integration Support - / - - / 10.174 - / 8.694 - / 4.880 - / - - / 4.880 - / 5.127 - / 4.815 - / 3.913 - / - Continuing Continuing Subtotal: Recurring - / - - / 28.417 - / 24.597 - / 19.038 - / - - / 19.038 - / 19.333 - / 17.052 - / 14.989 - / - Continuing Continuing Subtotal: MLRS MODS - / - - / 28.417 - / 24.597 - / 19.038 - / - - / 19.038 - / 19.333 - / 17.052 - / 14.989 - / - Continuing Continuing 131 / 289.496 - / - 131 / 289.496 117 / 302.374 - / - Continuing Continuing - / - - - / - Subtotal: Recurring Subtotal: APNT Modification Item 5 of 5: MLRS MODS A Kits Recurring Subtotal: Procurement, All Modification Items 527 / 2,416.099 58 / 320.591 54 / 243.470 115 / 289.782 113 / 295.560 Installation Subtotal: Installation LI 6552C67500 - MLRS Mods Army - / - - / - - / - - / - UNCLASSIFIED Page 7 of 13 / - - / - - / - P-1 Line #24 - / - - / - - / - Volume 1 - 291 === page 322 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 6552C67500 / MLRS Mods Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: M270A1 Modification Type: . Prior Years Financial Plan Modification Number / Title: C67500 / MLRS Mods FY 2025 FY 2026 Related RDT&E PEs: FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Total Cost (Procurement + Support + Installation) LI 6552C67500 - MLRS Mods Army 2,416.099 320.591 243.470 289.496 - UNCLASSIFIED Page 8 of 13 289.496 289.782 295.560 P-1 Line #24 302.374 - Continuing Continuing Volume 1 - 292 === page 323 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 6552C67500 / MLRS Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C67500 / MLRS Mods MDAP/MAIS Code: Modification Item 1 of 5: MLRS Fleet Expansion Manufacturer Information Manufacturer Name: Lockheed Martin Missiles & Fire Control Manufacturer Location: Camden, AR Administrative Leadtime (in Months): 3 Dates FY 2025 Production Leadtime (in Months): 33 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Lockheed Martin Facility, Camden, AR LI 6552C67500 - MLRS Mods Army Installation Quantity: 0 UNCLASSIFIED Page 9 of 13 P-1 Line #24 Volume 1 - 293 === page 324 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 6552C67500 / MLRS Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C67500 / MLRS Mods MDAP/MAIS Code: Modification Item 2 of 5: MLRS Fleet Upgrade Manufacturer Information Manufacturer Name: Lockheed Martin Missiles & Fire Control Manufacturer Location: Camden, AR Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 33 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Apr 2025 Apr 2026 Apr 2027 Apr 2028 Apr 2029 Apr 2030 Delivery Dates Dec 2027 Dec 2028 Dec 2029 Dec 2030 Dec 2031 Dec 2032 FY 2031 Installation Information Method of Implementation (Organic): Lockheed Martin Facility, Camden, AR LI 6552C67500 - MLRS Mods Army Installation Quantity: 0 UNCLASSIFIED Page 10 of 13 P-1 Line #24 Volume 1 - 294 === page 325 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 6552C67500 / MLRS Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C67500 / MLRS Mods MDAP/MAIS Code: Modification Item 3 of 5: Improved Armored Cab (IAC) Manufacturer Information Manufacturer Name: American Rheinmetall Defense, Inc. Manufacturer Location: Lansing, MI Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 21 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates May 2025 May 2026 May 2027 May 2028 May 2029 May 2030 Delivery Dates May 2027 May 2028 May 2029 May 2030 May 2031 May 2032 FY 2031 Installation Information Method of Implementation (Organic): Depot LI 6552C67500 - MLRS Mods Army Installation Quantity: 0 UNCLASSIFIED Page 11 of 13 P-1 Line #24 Volume 1 - 295 === page 326 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 6552C67500 / MLRS Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C67500 / MLRS Mods MDAP/MAIS Code: Modification Item 4 of 5: APNT Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 3 Dates FY 2025 Production Leadtime (in Months): 21 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Apr 2027 Apr 2028 Apr 2029 Apr 2030 Delivery Dates Apr 2029 Apr 2030 Apr 2031 Apr 2032 FY 2031 Installation Information Method of Implementation (Organic): Field Artillery Launchers Product Office LI 6552C67500 - MLRS Mods Army Installation Quantity: 0 UNCLASSIFIED Page 12 of 13 P-1 Line #24 Volume 1 - 296 === page 327 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 6552C67500 / MLRS Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C67500 / MLRS Mods MDAP/MAIS Code: Modification Item 5 of 5: MLRS MODS Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Field Artillery Launchers Product Office LI 6552C67500 - MLRS Mods Army Installation Quantity: 0 UNCLASSIFIED Page 13 of 13 P-1 Line #24 Volume 1 - 297 === page 328 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 6580C67501 / HIMARS Modifications Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 03: Modification of Missiles / BSA 10: Modifications Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0210600A, 0603778A, 0210608A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 409.731 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 409.731 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 409.731 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 49.581 54.005 54.363 - 54.363 99.372 99.860 99.826 - - - - - - - - 49.581 54.005 54.363 - 54.363 99.372 99.860 99.826 - - - - - - - - 49.581 54.005 54.363 - 54.363 99.372 99.860 99.826 To FY 2031 Complete 155.221 Continuing 155.221 155.221 Total - Continuing Continuing Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The M142 High Mobility Artillery Rocket System (M142 HIMARS) launcher is a full-spectrum, lightly-armored, combat-proven, all-weather, 24/7 lethal and responsive, precision strike weapon system. M142 HIMARS launchers support the Army's Long Range Precision Fires modernization effort. M142 HIMARS provides critical missile precision strike, operational shaping fires, counterfire, and close support destructive and suppressive fires. The M142 HIMARS is a C-130 or C-17 transportable, wheeled, indirect fire, rocket/missile launcher capable of firing one pod of precision rockets/missiles from the current Multiple Launch Rocket System (MLRS) Family of Munitions (MFOM) including the Guided Multiple Launch Rocket System (GMLRS) and the Army Tactical Missile System (ATACMS), the Precision Strike Missile (PrSM), and future MFOM to include the Extended Range GMLRS (ER-GMLRS). M142 HIMARS launchers support Integrated Fires and Multi-Domain Operations. MOD 1 (M142 Mods). Modifications to address safety, operational-related, chassis, fire control system, and Command, Control, Communications, Computer, and Intelligence (C4I) obsolescence issues within the M142 HIMARS fleet. MOD 1 also incorporates updates to the Interactive Electronic Technical Manuals for Soldiers to perform operator maintenance and troubleshooting on the HIMARS Launcher. Additionally, procures system-specific training devices required to support the M142 HIMARS Vehicle and Maintainer training courses. Systems engineering efforts will address obsolescence issues and apply necessary modifications to the major M142 HIMARS components of the Carrier, launcher loader module, and fire control system. Common Fire Control System (CFCS) obsolescence mitigation replaces obsolete components as well as modernizes the board layout from the antiquated through-hole design to surface mount technology. This allows for continued production of CFCS. MOD 2 (CFCS). Modifications to procure Common Fire Control System (CFCS) retrofit kits and Common Fire Control System (CFCS) Launcher Adapter Group (LAG) kit to equip the M142 HIMARS Launcher fleet. The CFCS LAG kit replaces the obsolete Universal Fire Control System (UFCS) that cannot be procured as designed. Purchase of the CFCS LAG updates and replaces UFCS equipped HIMARS with CFCS equipment and capabilities; mitigating obsolescence issues. CFCS provides the capability to launch all current and future MFOM and provides an updated and more intuitive user interface common to both M142 HIMARS and M270A2 MLRS launchers. Pure-fleeting of M142 HIMARS with CFCS will reduce training costs and operations and maintenance costs. MOD 3 (APNT). (Assured Position, Navigation and Timing (APNT) Mods). This APNT update provides Anti-Jam (AJ) capability to UFCS-equipped launchers and CFCS-equipped launchers by utilizing the Digital Anti-Jam Receiver (DIGAR). The UFCS-equipped M142 HIMARS launchers will integrate DIGAR capability. Pending FY 2026 production decisions to procure M-Code receivers and DIGAR capabilities, CFCSequipped M142 HIMARS launchers will implement the anti-jam antenna (DIGAR) in FY 2026 and upgrade the NAVSTRIKE to the NAVSTRIKE-M Global Positioning System (GPS) receiver in FY 2027, providing M-Code capability. LI 6580C67501 - HIMARS Modifications Army UNCLASSIFIED Page 1 of 10 P-1 Line #25 Volume 1 - 298 === page 329 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 6580C67501 / HIMARS Modifications Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 03: Modification of Missiles / BSA 10: Modifications Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0210600A, 0603778A, 0210608A Line Item MDAP/MAIS Code: N/A Secondary Distribution Army Quantity Total Obligation Authority ANG Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 6580C67501 - HIMARS Modifications Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 14.582 54.005 27.181 - 27.181 49.686 49.930 49.913 77.610 - - - - - - - - - 34.999 - 27.182 - 27.182 49.686 49.930 49.913 77.611 - - - - - - - - 49.581 54.005 54.363 - 54.363 99.372 99.860 99.826 UNCLASSIFIED Page 2 of 10 P-1 Line #25 155.221 Volume 1 - 299 === page 330 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 6580C67501 / HIMARS Modifications Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 03: Modification of Missiles / BSA 10: Modifications ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: 0210600A, 0603778A, 0210608A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a C67501 / HIMARS Modifications (Operational, Reliability, Safety, Crew Survivability) - / 409.731 - / 49.581 - / 54.005 - / 54.363 - / - - / 54.363 P-40 Total Gross/Weapon System Cost - / 409.731 - / 49.581 - / 54.005 - / 54.363 - / - - / 54.363 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a C67501 / HIMARS Modifications (Operational, Reliability, Safety, Crew Survivability) - / 99.372 - / 99.860 - / 99.826 - / 155.221 P-40 Total Gross/Weapon System Cost - / 99.372 - / 99.860 - / 99.826 - / 155.221 Continuing Continuing Continuing Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Base procurement dollars in the amount of $54.363 million support obsolescence mitigation and other design modifications of the M142 High Mobility Artillery Rocket System (M142 HIMARS) fleet (MOD 1), CFCS Mods (MOD 2), and APNT mods (MOD 3). MOD 1. FY 2027 HIMARS Modifications funding will include efforts such as: Interactive Electronic Technical Manuals (IETM) updates, Diagnostic Trainer and M142 HIMARS Mock-up Trainer updates, and system engineering modifications to the major M142 HIMARS components. MOD 2. FY 2027 continues the funding for MOD 2 (CFCS). Procures 46 CFCS retrofit kits and 6 CFCS Launcher Adapter Group (LAG) kits, to modernize the M142 HIMARS launcher fire control system to provide the capability to launch all current and future munitions and enable obsolescence mitigation. The LAGs are fielded at a three-to-one ratio of launchers-to-LAGs. The CFCS LAG Kit is a set of cables and adapters used to test the CFCS. To provide budget transparency, MOD 2 captures CFCS LAG kit purchases as a distinctive cost element under MOD 2 versus obsolescence mitigation measures associated with MOD 1. MOD 3. FY 2027 continues the MOD 3 (APNT update). Procures 46 DIGAR kits to protect fielded UFCS-equipped M142 HIMARS launchers from Global Positioning System (GPS) jamming and procures 16 APNT Launcher Adapter Group (LAG) kits. These APNT LAG kits are an additional LAG component specific to UFCS DIGARS-equipped launchers and fielded at a nine-to-one ratio of launchers-to-LAGs. The APNT LAG Kit is a set of cables and adapters used to test the APNT. These LAG kits enable troubleshooting of DIGARS equipped UFCS M142 HIMARS. The modernized hardware (DIGAR) improves system robustness against the GPS jamming threat. Procurement of NavStrike-M facilitates compliance with statutory requirements and begins in FY 2027. HIMARS MODS Funding increase from FY 2026 to FY 2027 has no significant change. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 6580C67501 - HIMARS Modifications Army UNCLASSIFIED Page 3 of 10 P-1 Line #25 Volume 1 - 300 === page 331 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 6580C67501 / HIMARS Modifications Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: C67501 / HIMARS Modifications MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 409.731 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 409.731 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 409.731 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 49.581 54.005 54.363 - 54.363 99.372 99.860 99.826 - - - - - - - - 49.581 54.005 54.363 - 54.363 99.372 99.860 99.826 - - - - - - - - 49.581 54.005 54.363 - 54.363 99.372 99.860 99.826 To FY 2031 Complete - Total - 155.221 Continuing - Continuing - 155.221 Continuing 155.221 Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The M142 High Mobility Artillery Rocket System (M142 HIMARS) launcher is a full-spectrum, lightly-armored, combat-proven, all-weather, 24/7 lethal and responsive, precision strike weapon system. M142 HIMARS launchers support the Army's Long Range Precision Fires modernization effort. M142 HIMARS provides critical missile precision strike, operational shaping fires, counterfire, and close support destructive and suppressive fires. The M142 HIMARS is a C-130 or C-17 transportable, wheeled, indirect fire, rocket/missile launcher capable of firing one pod of precision rockets/missiles from the current Multiple Launch Rocket System (MLRS) Family of Munitions (MFOM) including the Guided Multiple Launch Rocket System (GMLRS) and the Army Tactical Missile System (ATACMS), the Precision Strike Missile (PrSM), and future MFOM to include the Extended Range GMLRS (ER-GMLRS). M142 HIMARS launchers support Integrated Fires and Multi-Domain Operations. MOD 1 (M142 Mods). Modifications to address safety, operational-related, chassis, fire control system, and Command, Control, Communications, Computer, and Intelligence (C4I) obsolescence issues within the M142 HIMARS fleet. MOD 1 also incorporates updates to the Interactive Electronic Technical Manuals for Soldiers to perform operator maintenance and troubleshooting on the HIMARS Launcher. Additionally, procures system-specific training devices required to support the M142 HIMARS Vehicle and Maintainer training courses. Systems engineering efforts will address obsolescence issues and apply necessary modifications to the major M142 HIMARS components of the Carrier, launcher loader module, and fire control system. Common Fire Control System (CFCS) obsolescence mitigation replaces obsolete components as well as modernizes the board layout from the antiquated through-hole design to surface mount technology. This allows for continued production of CFCS. MOD 2 (CFCS). Modifications to procure Common Fire Control System (CFCS) retrofit kits and Common Fire Control System (CFCS) Launcher Adapter Group (LAG) kit to equip the M142 HIMARS Launcher fleet. The CFCS LAG kit replaces the obsolete Universal Fire Control System (UFCS) that cannot be procured as designed. Purchase of the CFCS LAG updates and replaces UFCS equipped HIMARS with CFCS equipment and capabilities; mitigating obsolescence issues. CFCS provides the capability to launch all current and future MFOM and provides an updated and more intuitive user interface common to both M142 HIMARS and M270A2 MLRS launchers. Pure-fleeting of M142 HIMARS with CFCS will reduce training costs and operations and maintenance costs. MOD 3 (APNT). (Assured Position, Navigation and Timing (APNT) Mods). This APNT update provides Anti-Jam (AJ) capability to UFCS-equipped launchers and CFCS-equipped launchers by utilizing the Digital Anti-Jam Receiver (DIGAR). The UFCS-equipped M142 HIMARS launchers will integrate DIGAR capability. Pending FY 2026 production decisions to procure M-Code receivers and DIGAR capabilities, CFCSequipped M142 HIMARS launchers will implement the anti-jam antenna (DIGAR) in FY 2026 and upgrade the NAVSTRIKE to the NAVSTRIKE-M Global Positioning System (GPS) receiver in FY 2027, providing M-Code capability. Secondary Distribution Army Quantity Total Obligation Authority ANG Quantity LI 6580C67501 - HIMARS Modifications Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 14.582 54.005 27.181 - 27.181 49.686 49.930 49.913 77.610 - - - - - - - - - UNCLASSIFIED Page 4 of 10 P-1 Line #25 Volume 1 - 301 === page 332 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 6580C67501 / HIMARS Modifications ID Code (A=Service Ready, B=Not Service Ready) : Secondary Distribution Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 6580C67501 - HIMARS Modifications Army Modification Number / Title: C67501 / HIMARS Modifications MDAP/MAIS Code: FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 34.999 - 27.182 - 27.182 49.686 49.930 49.913 - - - - - - - - 49.581 54.005 54.363 - 54.363 99.372 99.860 99.826 UNCLASSIFIED Page 5 of 10 P-1 Line #25 77.611 155.221 Volume 1 - 302 === page 333 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 6580C67501 / HIMARS Modifications Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: M142 High Mobility Artillery Rocket System Prior Years Financial Plan Modification Number / Title: C67501 / HIMARS Modifications Modification Type: Operational, Reliability, Safety, Crew Survivability FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 3: M142 Mods A Kits Recurring Program Management Obsolescence Mitigation - / 9.799 - / 1.594 - / 1.627 - / 1.661 - / - - / 1.661 - / 1.696 - / 1.732 - / 1.768 - / 1.805 Continuing Continuing / 295.449 - / 1.386 - / 1.261 - / 2.158 - / - - / 2.158 - / 1.724 - / 1.718 - / 2.014 - / 1.463 Continuing Continuing / - - / - / - Continuing Continuing Industrial Facilities - / 2.499 Peculiar Support Equipment - / 1.019 - / 0.152 - / 0.155 - / 0.158 - / - - / 0.158 - / 0.161 - / 0.164 - / 0.164 - / 0.164 Continuing Continuing Training - / 3.845 - / 0.574 - / 0.586 - / 0.598 - / - - / 0.598 - / 0.610 - / 0.622 - / 0.622 - / 0.622 Continuing Continuing Test & Evaluation (Acceptance Testing) - / 6.973 - / 1.040 - / 1.051 - / 1.055 - / - - / 1.055 - / 1.040 - / 1.003 - / 0.973 - / 1.124 Continuing Continuing - / 2.276 - / 2.303 - / 2.354 - / - - / 2.354 - / 2.198 - / 1.834 - / 3.388 - / 3.197 Continuing Continuing / - - / - Systems Engineering - / 13.244 CFCS Obsolescence Mitigation - / 19.695 Subtotal: Recurring Subtotal: M142 Mods - - / - - / - - / - - / - - - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 19.695 - / 352.523 - / 7.022 - / 6.983 - / 7.984 - / - - / 7.984 - / 7.429 - / 7.073 - / 8.929 - / 8.375 Continuing Continuing - / 352.523 - / 7.022 - / 6.983 - / 7.984 - / - - / 7.984 - / 7.429 - / 7.073 - / 8.929 - / 8.375 Continuing Continuing Modification Item 2 of 3: CFCS Kit A Kits Recurring CFCS A Kit CFCS LAG Kits Subtotal: Recurring Subtotal: CFCS Kit 37 / 29.008 44 / 35.200 45 / 36.720 46 / 38.410 - / - 46 / 38.410 90 / 76.410 89 / 77.074 84 / 75.684 131 / 122.747 Continuing Continuing 17 / 3.159 18 / 3.402 6 / 1.158 - / - 6 / 1.158 10 / 1.970 10 / 2.010 10 / 2.050 15 / 3.135 Continuing Continuing 37 / 29.008 61 / 38.359 63 / 40.122 52 / 39.568 - / - 52 / 39.568 100 / 78.380 99 / 79.084 94 / 77.734 146 / 125.882 Continuing Continuing 37 / 29.008 61 / 38.359 63 / 40.122 52 / 39.568 - / - 52 / 39.568 100 / 78.380 99 / 79.084 94 / 77.734 146 / 125.882 Continuing Continuing 376 / 28.200 35 / 4.200 53 / 6.360 - / - Modification Item 3 of 3: APNT Kit A Kits Recurring DIGAR Kits 46 / 5.875 - / - 46 / 5.875 90 / 11.724 89 / 11.826 84 / 11.385 131 / 18.110 Continuing Continuing / - 46 / 0.440 - / - 46 / 0.440 90 / 0.879 89 / 0.887 84 / 0.854 131 / 1.358 Continuing Continuing / - 18 / 0.540 16 / 0.496 - / - 16 / 0.496 30 / 0.960 30 / 0.990 28 / 0.924 44 / 1.496 Continuing Continuing 376 / 28.200 35 / 4.200 71 / 6.900 108 / 6.811 - / - 108 / 6.811 210 / 13.563 208 / 13.703 196 / 13.163 306 / 20.964 Continuing Continuing 376 / 28.200 35 / 4.200 71 / 6.900 108 / 6.811 - / - 108 / 6.811 210 / 13.563 208 / 13.703 196 / 13.163 306 / 20.964 Continuing Continuing 413 / 409.731 96 / 49.581 134 / 54.005 160 / 54.363 - / - 160 / 54.363 310 / 99.372 307 / 99.860 290 / 99.826 452 / 155.221 Continuing Continuing NavStrike-M Kits - / - - / - APNT Launcher Adapter Group Kits - / - - Subtotal: Recurring Subtotal: APNT Kit Subtotal: Procurement, All Modification Items - Installation LI 6580C67501 - HIMARS Modifications Army UNCLASSIFIED Page 6 of 10 P-1 Line #25 Volume 1 - 303 === page 334 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 6580C67501 / HIMARS Modifications Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: M142 High Mobility Artillery Rocket System Prior Years Financial Plan Subtotal: Installation Modification Number / Title: C67501 / HIMARS Modifications Modification Type: Operational, Reliability, Safety, Crew Survivability FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) - / - - / - - / - - / - - / - - / - - / - - / - - / - / - - 155.221 Continuing - / - - / - Total Total Cost (Procurement + Support + Installation) LI 6580C67501 - HIMARS Modifications Army 409.731 49.581 54.005 54.363 - UNCLASSIFIED Page 7 of 10 54.363 99.372 99.860 P-1 Line #25 99.826 Continuing Volume 1 - 304 === page 335 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 6580C67501 / HIMARS Modifications ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C67501 / HIMARS Modifications MDAP/MAIS Code: Modification Item 1 of 3: M142 Mods Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Field Artillery Launchers Product Office LI 6580C67501 - HIMARS Modifications Army Installation Quantity: 0 UNCLASSIFIED Page 8 of 10 P-1 Line #25 Volume 1 - 305 === page 336 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 6580C67501 / HIMARS Modifications ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C67501 / HIMARS Modifications MDAP/MAIS Code: Modification Item 2 of 3: CFCS Kit Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 21 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Apr 2025 Apr 2026 Apr 2027 Apr 2028 Apr 2029 Apr 2030 Apr 2031 Delivery Dates Apr 2027 Apr 2028 Apr 2029 Apr 2030 Apr 2031 Apr 2032 Apr 2033 Installation Information Method of Implementation (Organic): Field Artillery Launchers Product Office LI 6580C67501 - HIMARS Modifications Army Installation Quantity: 0 UNCLASSIFIED Page 9 of 10 P-1 Line #25 Volume 1 - 306 === page 337 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2032A / 03 / 10 P-1 Line Item Number / Title: 6580C67501 / HIMARS Modifications ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: C67501 / HIMARS Modifications MDAP/MAIS Code: Modification Item 3 of 3: APNT Kit Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 9 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Apr 2025 Apr 2026 Apr 2027 Apr 2028 Apr 2029 Apr 2030 Apr 2031 Delivery Dates Apr 2026 Apr 2027 Apr 2028 Apr 2029 Apr 2030 Apr 2031 Apr 2032 Installation Information Method of Implementation (Organic): Field Artillery Launchers Product Office LI 6580C67501 - HIMARS Modifications Army Installation Quantity: 0 UNCLASSIFIED Page 10 of 10 P-1 Line #25 Volume 1 - 307 === page 338 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 1242CA0250 / Spares And Repair Parts Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 04: Spares and Repair Parts / BSA 10: Spares And Repair Parts Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 405.925 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 405.925 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 405.925 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 6.695 6.651 6.698 - 6.698 6.701 6.759 6.757 - - - - - - - - 6.695 6.651 6.698 - 6.698 6.701 6.759 6.757 - - - - - - - - 6.695 6.651 6.698 - 6.698 6.701 6.759 6.757 To FY 2031 Complete - Total - 6.825 Continuing - Continuing - 6.825 Continuing - Continuing - - 6.825 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: FY 2027 funds provide for the procurement of spares to support initial fielding of new or modified end items. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 1242CA0250 - Spares And Repair Parts Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 6.695 6.651 6.698 - 6.698 6.701 6.759 6.757 6.825 - - - - - - - - - 6.695 6.651 6.698 - 6.698 6.701 6.759 6.757 6.825 UNCLASSIFIED Page 1 of 3 P-1 Line #26 Volume 1 - 308 === page 339 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 1242CA0250 / Spares And Repair Parts Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 04: Spares and Repair Parts / BSA 10: Spares And Repair Parts ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 CA0267 / PATRIOT MODIFICATION INITIAL SPARES - / 405.925 - / 6.695 - / 6.651 - / 6.698 - / - - / 6.698 P-40 Total Gross/Weapon System Cost - / 405.925 - / 6.695 - / 6.651 - / 6.698 - / - - / 6.698 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 procurement dollars in the amount of $6.698 Million support continuing acquisition of Patriot Modification Initial Spares. The funds in this account procure depot level repairable (DLR) secondary items from Supply Management, Army activities of the Army Working Capital Fund and commercial life cycle support vendors. To provide initial issue spares support, funds are required in the same year that end items are fielded. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 1242CA0250 - Spares And Repair Parts Army UNCLASSIFIED Page 2 of 3 P-1 Line #26 Volume 1 - 309 === page 340 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1242CA0250 / Spares And Repair Parts Appropriation / Budget Activity / Budget Sub Activity: 2032A / 04 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: CA0267 / PATRIOT MODIFICATION INITIAL SPARES MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 6.695 6.651 6.698 - 6.698 - Gross/Weapon System Cost ($ in Millions) 405.925 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 405.925 Plus CY Advance Procurement ($ in Millions) - - - - - 6.695 6.651 6.698 - 6.698 - Total Obligation Authority ($ in Millions) 405.925 FY 2027 Total - - - - - 6.695 6.651 6.698 - 6.698 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Hardware Cost Non Recurring Cost CA0267 / PATRIOT MODIFICATION INITIAL SPARES - - 405.925 - - 6.695 - - 6.651 - - 6.698 - - - - - 6.698 Subtotal: Non Recurring Cost - - 405.925 - - 6.695 - - 6.651 - - 6.698 - - - - - 6.698 Subtotal: Hardware Cost - - 405.925 - - 6.695 - - 6.651 - - 6.698 - - - - - 6.698 Gross/Weapon System Cost - - 405.925 - - 6.695 - - 6.651 - - 6.698 - - - - - 6.698 Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 1242CA0250 - Spares And Repair Parts Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total - - - - - 6.695 6.651 6.698 - 6.698 - - - - - 6.695 6.651 6.698 - 6.698 UNCLASSIFIED Page 3 of 3 P-1 Line #26 Volume 1 - 310 === page 341 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 05: Support Equipment and Facilities / BSA 1242C93000 / Air Defense Targets 10: Support Equipment & Facilities Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 1,334 - - - - - - - - - - 1,334 500.706 7.034 12.801 9.613 - 9.613 10.502 10.559 10.823 11.530 - 573.568 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 500.706 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 500.706 To FY 2031 Complete - - - - - - - - - - 7.034 12.801 9.613 - 9.613 10.502 10.559 10.823 11.530 - - - - - - - - - - - 7.034 12.801 9.613 - 9.613 10.502 10.559 10.823 11.530 - Total 573.568 573.568 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 375.342 429.961 Description: Air Defense Artillery (ADA) Targets program procures target hardware and associated training devices to include scoring, payload, and ground support equipment to provide equipment to facilitate Soldier force on target training against drones. This training consists of Department of the Army Pamphlet (DA PAM) 350-38 (Standards in Training Commission) required gunnery tables and aerial target tracking, training, and scoring. Target systems are also available to support collective training exercises and Force Development Test and Experimentation (FDT&E) investigations of engagement techniques against small unmanned aircraft systems. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 1242C93000 - Air Defense Targets Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 7.034 12.801 9.613 - 9.613 10.502 10.559 10.823 11.530 - - - - - - - - - 7.034 12.801 9.613 - 9.613 10.502 10.559 10.823 11.530 UNCLASSIFIED Page 1 of 4 P-1 Line #27 Volume 1 - 311 === page 342 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2032A: Missile Procurement, Army / BA 05: Support Equipment and Facilities / BSA 1242C93000 / Air Defense Targets 10: Support Equipment & Facilities ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 C93000 / Air Defense Targets 1,334 / 500.706 - / 7.034 - / 12.801 - / 9.613 - / - - / 9.613 P-40 Total Gross/Weapon System Cost 1,334 / 500.706 - / 7.034 - / 12.801 - / 9.613 - / - - / 9.613 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Base procurement funding of $9.613 million supports Executive Order 14307, Unleashing American Drone Dominance and associated SECWAR direction by enhancing the Departments ability to engage in force on target training against the spectrum of drones. Air Defense Artillery (ADA) target systems are used in training per DA PAM 350-38, Standards in Weapons Training. This includes gunnery tables, aerial target tracking with Captive Flight Trainers (CFT) and Tracking Head Trainers (THT), and missile live-fire exercises when missiles are allocated under the Missile Distribution Plan. Supported systems include U.S. Army Avenger and M-SHORAD platforms worldwide. Training requirements are generated by Army Major Commands, Training Centers, Division-level Commands, and real-world mission rehearsals. These have been validated against current force restructuring and align with approved training doctrine and Army Regulation 220-1 for unit readiness and Soldier qualification. Per Section 1815 of the FY 2008 NDAA (P.L. 110-181), this procurement supports both active and reserve components for homeland defense and global contingency missions. LI 1242C93000 - Air Defense Targets Army UNCLASSIFIED Page 2 of 4 P-1 Line #27 Volume 1 - 312 === page 343 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1242C93000 / Air Defense Targets Appropriation / Budget Activity / Budget Sub Activity: 2032A / 05 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C93000 / Air Defense Targets MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) FY 2027 Base FY 2027 OOC 1,334 FY 2025 - FY 2026 - - - - 500.706 7.034 12.801 9.613 - 9.613 - Net Procurement (P-1) ($ in Millions) 500.706 Plus CY Advance Procurement ($ in Millions) - - - - - 7.034 12.801 9.613 - 9.613 - Total Obligation Authority ($ in Millions) 500.706 FY 2027 Total - - - - - 7.034 12.801 9.613 - 9.613 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) 375.342 - - - - - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost Remotely Piloted Vehicle Target (RPVT) 111.867 4,115 460.333 - - - - - - - - - - - - - - - Infrared Kit Payload 0.344 4,114 1.415 - - - - - - - - - - - - - - - Launcher 33.742 31 1.046 - - - - - - - - - - - - - - - Manual Navigation GCS 12.258 62 0.760 - - - - - - - - - - - - - - - BVR Navigation GCS 33.538 39 1.308 - - - - - - - - - - - - - - - BVR Payload 14.851 195 2.896 - - - - - - - - - - - - - - - Acoustic Scoring Payload 15.322 311 4.765 - - - - - - - - - - - - - - - Acoustic Scoring GCS 49.000 34 1.666 - - - - - - - - - - - - - - - Radar Scoring Payload 20.255 235 4.760 - - - - - - - - - - - - - - - Radar Scoring GCS 19.333 9 0.174 - - - - - - - - - - - - - - - RPVT Lighting Kit Payload 0.313 463 0.145 - - - - - - - - - - - - - - - 2,009.125 8 16.073 3.000 - - 3.030 - - - - - 3.030 Smoke Generator Payload 0.497 173 0.086 - - - - - - - - - - - - - - - Over the Horizon BVR Payload 22.881 59 1.350 - - - - - - - - - - - - - - - - - 496.777 - - 2.910 - - 3.000 - - 3.030 - - - - - 3.030 Program Management Support Subtotal: Recurring Cost LI 1242C93000 - Air Defense Targets Army 2,910.000 1 2.910 3,000.000 1 UNCLASSIFIED Page 3 of 4 P-1 Line #27 Volume 1 - 313 === page 344 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1242C93000 / Air Defense Targets Appropriation / Budget Activity / Budget Sub Activity: 2032A / 05 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: C93000 / Air Defense Targets MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Non Recurring Cost Interim Contract Support (ICS) - - - - - 4.124 - - 9.801 - - - - - - - - - Group 1 through 3 UAS Target Requirements - - - - - - - - - - - 6.583 - - - - - 6.583 Subtotal: Non Recurring Cost - - - - - 4.124 - - 9.801 - - 6.583 - - - - - 6.583 - - 496.777 - - 7.034 - - 12.801 - - 9.613 - - - - - 9.613 Subtotal: Flyaway Cost Software Cost Recurring Cost Technical Refresh Windows OS Update Subtotal: Recurring Cost Subtotal: Software Cost Gross/Weapon System Cost 1,965.000 3.930 - - - - - - - - - - - - - - - - - 3.930 - - - - - - - - - - - - - - - - - 3.930 - - - - - - - - - - - - - - - 1,334 500.706 - - 7.034 - - 12.801 - - 9.613 - - - - - 9.613 375.342 2 Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 1242C93000 - Air Defense Targets Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total - - - - - 7.034 12.801 9.613 - 9.613 - - - - - 7.034 12.801 9.613 - 9.613 UNCLASSIFIED Page 4 of 4 P-1 Line #27 Volume 1 - 314