=== page 1 === UNCLASSIFIED Department of War Fiscal Year (FY) 2027 Budget Estimates April 2026 Army Justification Book Volume 1 of 1 Procurement of Ammunition, Army UNCLASSIFIED === page 2 === === page 3 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Volume 1 Table of Contents Introduction and Explanation of Contents................................................................................................................Volume 1 - ii Comptroller Exhibit P-1..............................................................................................................................................Volume 1 - iv Line Item Table of Contents (by Appropriation then Line Number).................................................................... Volume 1 - xxi Line Item Table of Contents (Alphabetically by Line Item Title)........................................................................ Volume 1 - xxiv Exhibit P-1M, Procurement Programs - Modification Summary........................................................................ Volume 1 - xxvi Exhibit P-40s................................................................................................................................................................ Volume 1 - 1 UNCLASSIFIED Volume 1 - i === page 4 === === page 5 === Cost Statement The following Justification Books were prepared at a cost of $337,499.00: Aircraft (ACFT), Missile (MSLS), Weapons & Tracked Combat Vehicles (WTCV), Ammunition (AMMO), Other Procurement Army (OPA) 1 - Tactical & Support Vehicles, Other Procurement Army (OPA) 2 - Communications & Electronics, Other Procurement Army (OPA) 3 & 4 - Other Support Equipment & Spares, Research, Development, Test and Evaluation (RDTE) for: Budget Activity 1, Budget Activity 2, Budget Activity 3, Budget Activity 4A, Budget Activity 4B, Budget Activity 5A, Budget Activity 5B, Budget Activity 5C, Budget Activity 5D, Budget Activity 6, Budget Activity 7 and Budget Activity 8. Volume 1 - ii === page 6 === PROCUREMENT OF AMMUNITION, ARMY Appropriation Language For construction, procurement, production, modification, and modernization of ammunition, equipment, spare parts and accessories therefore; specialized equipment and training devices; expansion of public and private plants, including ammunition facilities, authorized by Sec 2854 of Title 10, United States Code, and land necessary therefore, for the foregoing purposes, and such lands and interest therein, may be acquired, and construction prosecuted thereon prior to approval of title; and procurement and installation of equipment, appliances, and machine tools in public and private plants; reserve plant and Government and contractor-owned equipment layaway; and other expenses necessary for the foregoing purposes, $5,469,588,000 in fiscal year 2027 to remain available for obligation until September 30, 2029. Volume 1 - iii === page 7 === Volume 1 - iv === page 8 === Volume 1 - v === page 9 === Volume 1 - vi === page 10 === Volume 1 - vii === page 11 === Volume 1 - viii === page 12 === Volume 1 - ix === page 13 === Volume 1 - x === page 14 === Volume 1 - xi === page 15 === Volume 1 - xii === page 16 === Volume 1 - xiii === page 17 === Volume 1 - xiv === page 18 === Volume 1 - xv === page 19 === Volume 1 - xvi === page 20 === Volume 1 - xvii === page 21 === Volume 1 - xviii === page 22 === Volume 1 - xix === page 23 === Executive Summary for Procurement of Ammunition, Army Table 1: Funding Overview FY 2025 ($K) FY 2026 ($K) FY 2027 ($K) $2,809,602 $4,551,337 $5,444,958 $0 $357,000 $0 $2,809,602 $4,908,337 $5,444,958 Discretionary Mandatory Total Table 2: Detailed Mandatory Breakout BLI Reconciliation Bin Title FY 2025 ($K) FY 2026 ($K) FY 2027 ($K) E02000A Munitions and Supply Chain $0 $38,000 $0 ER8120A Munitions and Supply Chain $0 $62,000 $0 EP1000A Improve Readiness $0 $107,000 $0 EP1000A Munitions and Supply Chain $0 $150,000 $0 $0 $357,000 $0 Mandatory Total MANDATORY FUNDING JUSTIFICATION: The FY 2026 spend plan amount for Procurement of Ammunition, Army includes $4,551,337 thousand of discretionary and $357,000 thousand of mandatory (reconciliation) for a total of $4,908,337 thousand. The FY 2025 spend plan amount for Procurement of Ammunition, Army includes $2,809,602 thousand of discretionary and $0 thousand of mandatory (reconciliation) for a total of $2,809,602 thousand. Volume 1 - xx === page 24 === === page 25 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (by Appropriation then Line Number) Appropriation 2034A: Procurement of Ammunition, Army Line # BA BSA Line Item Number Line Item Title Page 1 01 30 0132E00700 CTG, 5.56MM, All Types....................................................................................................................... Volume 1 - 1 2 01 30 0612E02000 CTG, 7.62MM, All Types..................................................................................................................... Volume 1 - 57 3 01 30 1065E06001 NEXT GENERATION SQUAD WEAPON AMMUNITION....................................................................Volume 1 - 80 4 01 30 1450EA3000 CTG, Handgun, All Types..................................................................................................................Volume 1 - 142 5 01 30 1722E08000 CTG, .50 Cal, All Types.....................................................................................................................Volume 1 - 151 6 01 30 2382E08900 CTG, 20mm, All Types...................................................................................................................... Volume 1 - 183 7 01 30 2650E08200 CTG, 25mm, All Types...................................................................................................................... Volume 1 - 191 8 01 30 2938ER8120 CTG, 30mm, All Types...................................................................................................................... Volume 1 - 206 9 01 30 3222ER8001 CTG, 40mm, All Types...................................................................................................................... Volume 1 - 253 10 01 30 8030E80010 CTG, 50MM, All Types...................................................................................................................... Volume 1 - 278 11 01 33 0050E89600 60MM Mortar, All Types.................................................................................................................... Volume 1 - 294 12 01 33 3584E76000 81MM Mortar, All Types.................................................................................................................... Volume 1 - 324 13 01 33 6780E25500 120MM Mortar, All Types.................................................................................................................. Volume 1 - 350 14 01 35 1120E22203 Cartridges, Tank, 105MM And 120MM, All Types.............................................................................Volume 1 - 388 15 01 37 0530E15101 Artillery Cartridges, 75MM & 105MM, All Types................................................................................Volume 1 - 420 16 01 37 3102E89500 ARTILLERY PROJECTILE, 155MM, All Types................................................................................. Volume 1 - 438 UNCLASSIFIED Volume 1 - xxi === page 26 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Appropriation 2034A: Procurement of Ammunition, Army Line # BA BSA Line Item Number Line Item Title Page 17 01 37 6635F90100 PRECISION ARTILLERY MUNITIONS..............................................................................................Volume 1 - 469 18 01 37 8750E27501 Artillery Propellants, Fuzes and Primers, All..................................................................................... Volume 1 - 471 19 01 43 0442EA0800 Mines & Clearing Charges, All Types................................................................................................Volume 1 - 524 20 01 43 0612E76740 Close Terrain Shaping Obstacle........................................................................................................Volume 1 - 548 21 01 43 7920E72501 MINE, AT, VOLCANO, All Types.......................................................................................................Volume 1 - 550 22 01 45 2348EA4000 Shoulder Launched Munitions, All Types.......................................................................................... Volume 1 - 551 23 01 45 3246E37300 Rocket, Hydra 70, All Types..............................................................................................................Volume 1 - 572 24 01 47 2420E61000 CAD/PAD, All Types.......................................................................................................................... Volume 1 - 585 25 01 47 2790E55400 Demolition Munitions, All Types.........................................................................................................Volume 1 - 593 26 01 47 4582E34000 Grenades, All Types.......................................................................................................................... Volume 1 - 656 27 01 47 6038E46900 Signals, All Types.............................................................................................................................. Volume 1 - 703 28 01 47 8278E51200 Simulators, All Types......................................................................................................................... Volume 1 - 748 29 01 47 9847E97900 REACTIVE ARMOR TILES................................................................................................................Volume 1 - 788 30 01 50 0684EB0016 Ammo Components, All Types.......................................................................................................... Volume 1 - 790 31 01 50 2624EA0055 Items Less Than $5 Million (AMMO)................................................................................................. Volume 1 - 791 32 01 50 4370EA0575 Ammunition Peculiar Equipment........................................................................................................ Volume 1 - 811 33 01 50 4758EA0550 First Destination Transportation (AMMO).......................................................................................... Volume 1 - 815 34 01 50 9615EA8500 Closeout Liabilities............................................................................................................................. Volume 1 - 818 UNCLASSIFIED Volume 1 - xxii === page 27 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Appropriation 2034A: Procurement of Ammunition, Army Line # BA BSA Line Item Number Line Item Title Page 35 02 10 0572EP1000 Industrial Facilities..............................................................................................................................Volume 1 - 819 36 02 10 4099EP1700 Conventional Munitions Demilitarization............................................................................................ Volume 1 - 881 37 02 10 4150EP2500 ARMS Initiative...................................................................................................................................Volume 1 - 889 UNCLASSIFIED Volume 1 - xxiii === page 28 === === page 29 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (Alphabetically by Line Item Title) Line Item Title Line Item Number Line # BA BSA Page 120MM Mortar, All Types 6780E25500 13 01 33................... Volume 1 - 350 60MM Mortar, All Types 0050E89600 11 01 33................... Volume 1 - 294 81MM Mortar, All Types 3584E76000 12 01 33................... Volume 1 - 324 ARMS Initiative 4150EP2500 37 02 10................... Volume 1 - 889 ARTILLERY PROJECTILE, 155MM, All Types 3102E89500 16 01 37................... Volume 1 - 438 Ammo Components, All Types 0684EB0016 30 01 50................... Volume 1 - 790 Ammunition Peculiar Equipment 4370EA0575 32 01 50................... Volume 1 - 811 Artillery Cartridges, 75MM & 105MM, All Types 0530E15101 15 01 37................... Volume 1 - 420 Artillery Propellants, Fuzes and Primers, All 8750E27501 18 01 37................... Volume 1 - 471 CAD/PAD, All Types 2420E61000 24 01 47................... Volume 1 - 585 CTG, .50 Cal, All Types 1722E08000 5 01 30................... Volume 1 - 151 CTG, 20mm, All Types 2382E08900 6 01 30................... Volume 1 - 183 CTG, 25mm, All Types 2650E08200 7 01 30................... Volume 1 - 191 CTG, 30mm, All Types 2938ER8120 8 01 30................... Volume 1 - 206 CTG, 40mm, All Types 3222ER8001 9 01 30................... Volume 1 - 253 CTG, 5.56MM, All Types 0132E00700 1 01 30....................... Volume 1 - 1 CTG, 50MM, All Types 8030E80010 10 01 30................... Volume 1 - 278 UNCLASSIFIED Volume 1 - xxiv === page 30 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page CTG, 7.62MM, All Types 0612E02000 2 01 30..................... Volume 1 - 57 CTG, Handgun, All Types 1450EA3000 4 01 30................... Volume 1 - 142 Cartridges, Tank, 105MM And 120MM, All Types 1120E22203 14 01 35................... Volume 1 - 388 Close Terrain Shaping Obstacle 0612E76740 20 01 43................... Volume 1 - 548 Closeout Liabilities 9615EA8500 34 01 50................... Volume 1 - 818 Conventional Munitions Demilitarization 4099EP1700 36 02 10................... Volume 1 - 881 Demolition Munitions, All Types 2790E55400 25 01 47................... Volume 1 - 593 First Destination Transportation (AMMO) 4758EA0550 33 01 50................... Volume 1 - 815 Grenades, All Types 4582E34000 26 01 47................... Volume 1 - 656 Industrial Facilities 0572EP1000 35 02 10................... Volume 1 - 819 Items Less Than $5 Million (AMMO) 2624EA0055 31 01 50................... Volume 1 - 791 MINE, AT, VOLCANO, All Types 7920E72501 21 01 43................... Volume 1 - 550 Mines & Clearing Charges, All Types 0442EA0800 19 01 43................... Volume 1 - 524 NEXT GENERATION SQUAD WEAPON AMMUNITION 1065E06001 3 01 30..................... Volume 1 - 80 PRECISION ARTILLERY MUNITIONS 6635F90100 17 01 37................... Volume 1 - 469 REACTIVE ARMOR TILES 9847E97900 29 01 47................... Volume 1 - 788 Rocket, Hydra 70, All Types 3246E37300 23 01 45................... Volume 1 - 572 Shoulder Launched Munitions, All Types 2348EA4000 22 01 45................... Volume 1 - 551 Signals, All Types 6038E46900 27 01 47................... Volume 1 - 703 Simulators, All Types 8278E51200 28 01 47................... Volume 1 - 748 UNCLASSIFIED Volume 1 - xxv === page 31 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Exhibit P-1M, Procurement Programs - Modification Summary (Listing by Model) Lookup Matrix by Model UNCLASSIFIED Exhibit P-1M, Procurement Programs - Modification Summary Page 1 of 1 Volume 1 - xxvi === page 32 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Exhibit P-1M, Procurement Programs - Modification Summary (Funding for Modifications) Funding ($ M) Modification P-40a Item Title P-3a Modification Title PYS FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 Totals (Total Obligation Authority) Total Obligation Authority 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 UNCLASSIFIED Exhibit P-1M, Procurement Programs - Modification Summary Page 1 of 1 Volume 1 - xxvii === page 33 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 2,278.346 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 2,278.346 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 2,278.346 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 84.090 84.090 84.090 128.283 128.283 128.283 114.418 - - 114.418 - - 114.418 - 114.418 114.418 114.418 132.202 132.202 132.202 133.655 133.655 133.655 132.848 132.848 132.848 To FY 2031 Complete 134.946 134.946 134.946 Total - 3,138.788 - 3,138.788 - 3,138.788 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line includes 5.56MM ALL TYPES. (E01100) 5.56mm Blank, M200, Single Round cartridge consists of a brass cartridge case with primer and propellant sealed with a rosette crimp. This cartridge is used for training and ceremonial purposes without blank firing attachment (BFA) and in M16A2/A4 Series Rifles and M4 Carbine fitted with BFA. This item is Code A, approved for service use. (E01101) 5.56mm Blank, M200 Linked w/M27 links f/SAW cartridge consists of a brass cartridge case with primer and propellant sealed with a rosette crimp. This cartridge is used in the M249 Squad Automatic Weapon (SAW) Machine Gun with a Blank Firing Adapter, and it is designed to simulate firing during training exercises. This item is Code A, approved for service use. (E04607) 5.56mm M855A1 Ball Cartridges and M856A1/M1201 Tracer Cartridges Enhanced Performance Round (EPR) are linked in a 4-Ball/1-Tracer configuration with the M27 link for use in the M249 Machine Gun. The M855A1 Ball Cartridge has a steel penetrator and non-lead slug surrounded by a copper jacket. The M856A1 Tracer Cartridge is lead free and provides a visible red-light signature through its trajectory. The M856A1 Tracer Cartridge provides visible signature of fire out to 900 meters. The M1201 EPR Tracer Cartridge has a steel penetrator and provides a visible light signature through its trajectory with a limited view during its early trajectory, providing visible signature of fire out to 900 meters and a limited view visible signature, to the shooter only, for first 300 meters. This item is Code A, approved for service use. (E04608) 5.56mm Tracer, M856A1/M1201, M856A1 Single Round Bullet is lead free and provides a visible red-light signature through its trajectory. The M1201 Single Round Bullet is lead free and provides a visible light signature through its trajectory with a limited view during its early trajectory, providing visible signature of fire out to 900 meters and a limited view visible signature, to the shooter only, for first 300 meters. This item is Code A, approved for service use. (E95200) 5.56mm, M855A1 Ball Cartridge is linked with the M27 link for use in the M249 Machine Gun. The M855A1 Ball Cartridge has a steel penetrator and non-lead slug surrounded by a copper jacket. This item is Code A, approved for service use. (E95400) 5.56mm, M855A1 Ball Cartridge has a steel penetrator and lead-free slug surrounded by a copper jacket. The cartridge is used in M16A2/A4 Rifles and M4/M4A1 Carbines. This cartridge is packed in 10 round clips with bandoleers in standard military can pack. This item is Code A, approved for service use. LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 1 of 56 P-1 Line #1 Volume 1 - 1 === page 34 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A (E95700) 5.56mm, M855A1 Ball Cartridge has a steel penetrator and lead-free slug surrounded by a copper jacket. The cartridge is used in M16A2/A4 Rifles and M4/M4A1 Carbines. This cartridge is packed in 10 round clips without bandoleer in standard military can pack. This item is Code A, approved for service use. (E96110) 5.56mm Marking Blue, M1042 is used for force-on-force training engagements. The cartridge can be fired with the existing M4 Carbine and M16A2/A3/A4 Rifles with the use of a conversion bolt. The projectile leaves a mark upon impact (similar to paintball), thus enabling after action evaluation of training scenarios. It differs from paintball in that it is a full, complete cartridge with projectile and cartridge case containing a propulsion system for a low velocity launch. In FY 2021, this item transitioned to a lead-free version under the new DODIC AC39. This item is Code A, approved for service use. (E96111) 5.56mm Marking Red, M1042 is used for force-on-force training engagements. The cartridge can be fired with the existing M4 Carbine and the M16A2/A3/A4 Rifles with the use of a conversion bolt. The projectile leaves a mark upon impact (similar to paintball), thus enabling after action evaluation of training scenarios. It differs from paintball in that it is a full, complete cartridge with projectile and cartridge case containing a propulsion system for a low velocity launch. In FY 2021, this item transitioned to a lead-free version under the new DODIC AC40. This item is Code A, approved for service use. (E96120) 5.56mm Marking Blue, M1071 is used for force-on-force training engagements. The cartridge can be fired with the existing M249 Squad Automatic Weapon with the use of the conversion kit. The projectile leaves a mark upon impact (similar to paintball), thus enabling after action evaluation of training scenarios. It differs from paintball in that it is a full, complete cartridge with projectile and cartridge case containing a propulsion system for a low velocity launch. In FY 2021, this item transitioned to a lead-free version under the new DODIC AC42. This item is Code A, approved for service use. (E96121) 5.56mm Marking Red, M1071 is used for force-on-force training engagements. The cartridge can be fired with the existing M249 Squad Automatic Weapon with the use of the conversion kit. The projectile leaves a mark upon impact (similar to paintball), thus enabling after action evaluation of training scenarios. It differs from paintball in that it is a full, complete cartridge with projectile and cartridge case containing a propulsion system for a low velocity launch. In FY 2021, this item transitioned to a lead-free version under the new DODIC AC43. This item is Code A, approved for service use. (E96125) 5.56mm Short Range Training M1037 clipped cartridge will be used in live fire training scenarios. The M1037 clipped cartridge permits training in adjacent training areas due to its reduced Surface Danger Zone (SDZ) and can be fired with existing M4 weapons. This cartridge is used for Military Operations/Urban Terrain (MOUT) operational training. This item is Code A, approved for service use. LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 2 of 56 P-1 Line #1 Volume 1 - 2 === page 35 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 E01100 / CTG, 5.56mm Blank, M200, Single Round [A080] P-5a, P-21 A - / 572.711 - / 11.082 - / 10.692 - / 11.129 - / - - / 11.129 P-5 E01101 / CTG, 5.56mm Blank, M200 Linked f/SAW [A075] P-5a, P-21 A - / 243.774 - / 7.674 - / 6.256 - / 6.433 - / - - / 6.433 P-5 E04607 / CTG, 5.56mm 4 Ball EPR, M855A1 /1 TR M856A1 Linked [AB73] P-5a, P-21 A - / 112.373 - / 11.910 - / 12.677 - / 12.915 - / - - / 12.915 P-5 E04608 / CTG, 5.56mm Tracer, M856A1 Single Round [AB74] P-5a A - / 13.004 - / 0.494 - / 2.425 - / 2.100 - / - - / 2.100 P-5 E95200 / CTG, 5.56mm EPR Ball, M855A1 w/M27 Link f/SAW [AB56] P-5a A - / 39.105 - / 4.664 - / 4.755 - / 2.943 - / - - / 2.943 P-5 E95400 / CTG, 5.56mm Ball, M855A1 EPR, Clipped Mil Pack [AB57] P-5a, P-21 A - / 859.253 - / 0.524 - / 11.663 - / 53.793 - / - - / 53.793 P-5 E95700 / CTG, 5.56mm Ball, M855A1 Clipped Bulk Pack [AB77] P-5a, P-21 A - / 356.169 - / 39.808 - / 68.471 - / 13.474 - / - - / 13.474 P-5 E96110 / CTG, 5.56mm Marking, M1042 (Blue) [AC39] P-5a A - / 33.006 - / 2.953 - / 5.014 - / 5.139 - / - - / 5.139 P-5 E96111 / CTG, 5.56mm Marking, M1042 (Red) [AC40] P-5a A - / 18.312 - / 1.763 - / 2.616 - / 2.681 - / - - / 2.681 P-5 E96120 / CTG, 5.56mm Marking, M1071 (Blue) Linked f/SAW [AC42] P-5a A - / 7.586 - / 0.906 - / 1.720 - / 1.766 - / - - / 1.766 P-5 E96121 / CTG, 5.56mm Marking, M1071 (Red) Linked f/SAW [AC43] P-5a A - / 6.054 - / 0.694 - / 1.214 - / 1.245 - / - - / 1.245 P-5 E96125 / Ctg, 5.56mm, Short Range Training, M1037, sngl rd [AB67] P-5a A - / 16.999 - / 1.618 - / 0.780 - / 0.800 - / - - P-40 Total Gross/Weapon System Cost / 2,278.346 - / 84.090 / 114.418 - / - - - / 128.283 - - / 0.800 / 114.418 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 base budget supports critical Army Title 10 war reserve/operational, training, and test requirements in accordance with DoDI 3000.04 (Munitions Requirements Process) and AR 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War (OSW)-approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life-cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. The FY 2027 Budget supports the Minimum Sustaining Rates at both Lake City Army Ammunition Plant (LCAAP) as well as the Second Source Facility. FY 2027 Total dollars in the amount of $114.418 million supports the procurement of 212.128 million cartridges. (E01100) 5.56mm, Blank, M200, Single Round cartridge is a training unique item not used in combat. The FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $11.129 million support the procurement of 39.166 million M200 Blank Cartridges. Type classification date: prior to 1977 (E01101) 5.56mm, Blank, M200 Linked F/SAW is a training unique item not used in combat. The FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $6.433 million support the procurement of 14.446 million M200 Blank Linked Cartridges. LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 3 of 56 P-1 Line #1 Volume 1 - 3 === page 36 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Type classification date: prior to 1977 (E04607) 5.56mm M855A1 Ball and M856A1/M1201 Tracer Cartridges are training standard items used in both training and combat. The FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $12.915 million support the procurement of 17.753 million M855A1 Ball and M856A1/M1201 Tracer Cartridges. Type classification date: 2008 (E04608) 5.56mm Tracer, M856A1/M1201, Single Round Bullet is a training standard item used in training and combat. The FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $2.100 million support the procurement of 2.292 million M856A1 Single Round and M1201 Tracer Cartridges. Type classification date: 1982 (E95200) 5.56mm, M855A1 Ball Cartridge is linked with the M27 link and is a training standard item used in training and combat. The FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $2.943 million support the procurement of 4.518 million M855A1 Ball Cartridges linked with the M27 link. Type classification date: 1982 (E95400) 5.56mm, M855A1 Ball Cartridge is a training standard item used in training and combat. The FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $53.793 million support the procurement of 101.408 million M855A1 Ball Cartridges. Type classification date: 1982 (E95700) 5.56mm, M855A1 Ball Cartridge is a training standard item used in training and combat. The FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $13.474 million support the procurement of 20.879 million M855A1 Ball Cartridges. Type classification date: 1982 (E96110) 5.56mm, Marking, M1042 Blue is a training unique item not used in combat. The FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $5.139 million support the procurement of 5.781 million Marking Blue M1042 Cartridges. Type classification date: May 2009 (E96111) 5.56mm Marking, M1042 Red is a training unique item not used in combat. The FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $2.681 million support the procurement of 3.016 million of the Marking Red M1042 Cartridges. Type classification date: May 2009 (E96120) 5.56mm, Marking Blue, M1071 is a training unique item not used in combat. The FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $1.766 million support the procurement of 1.450 million of the Marking Blue M1071 Cartridges. Type classification date: May 2009 (E96121) 5.56mm, Marking Red, M1071 is a training unique item not used in combat. The FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $1.245 million support the procurement of 1.022 million of the Marking Red M1071 Cartridges. Type classification date: May 2009 (E96125) 5.56mm Short Range Training Ammunition (SRTA) M1037 clipped cartridges is a training unique item not used in combat. The FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $0.800 million support the procurement of 0.397 million of the clipped SRTA M1037 Cartridges. Type classification date: July 2012 LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 4 of 56 P-1 Line #1 Volume 1 - 4 === page 37 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 5 of 56 P-1 Line #1 Volume 1 - 5 === page 38 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E01100 / CTG, 5.56mm Blank, M200, Single Round [A080] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 11.082 10.692 11.129 - 11.129 - Gross/Weapon System Cost ($ in Millions) 572.711 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 572.711 Plus CY Advance Procurement ($ in Millions) - - - - - 11.082 10.692 11.129 - 11.129 - Total Obligation Authority ($ in Millions) 572.711 FY 2027 Total - - - - - 11.082 10.692 11.129 - 11.129 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost (†) 539.462 0.22 10.237 0.27 9.943 0.26 10.183 - - - 0.26 - - 539.462 - - 10.237 - - 9.943 - - 10.183 - - - - - 10.183 - - 539.462 - - 10.237 - - 9.943 - - 10.183 - - - - - 10.183 Production Engineering - - 33.053 - - 0.844 - - 0.748 - - 1.086 - - - - - 1.086 Subtotal: Support Production Engineering Cost - - 33.053 - - 0.844 - - 0.748 - - 1.086 - - - - - 1.086 Complete Round Subtotal: Recurring Cost Subtotal: Hardware Cost 3.38 159,463K 45,780,564 36,825,278 39,166,156 39,166,156 10.183 Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.060 - - 0.002 - - 0.004 - - 0.007 - - - - - 0.007 Subtotal: Support - Quality Assurance Cost - - 0.060 - - 0.002 - - 0.004 - - 0.007 - - - - - 0.007 Gross/Weapon System Cost - - 572.711 - - 11.082 - - 10.692 - - 11.129 - - - - - 11.129 Remarks: FY 2027 funding increase due to economic adjustment and to meet munitions requirement. (†) indicates the presence of a P-5a LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 6 of 56 P-1 Line #1 Volume 1 - 6 === page 39 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (†) Complete Round (†) Complete Round (†) Complete Round (†) Complete Round (†) Complete Round (†) Complete Round (†) O O C P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E01100 / CTG, 5.56mm Blank, M200, Single Round [A080] Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Jun 2025 Jul 2026 38,913,479 0.26 Y 2025 OLIN WINCHESTER LLC / OXFORD, MS Option / FFP ROCK ISLAND ARSENAL, IL Jun 2025 Jul 2026 6,867,085 0.26 Y 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Apr 2027 31,301,486 0.27 Y 2026 OLIN CORPORATION WINCHESTER / OXFORD, MS Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Apr 2027 5,523,792 0.27 Y 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Apr 2028 33,291,233 0.26 Y 2027 TO BE SELECTED / TO BE SELECTED C / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Apr 2028 5,874,923 0.26 Y RFP Issue Date indicates the presence of a P-21 Remarks: Complete round is an average unit cost between two contractors. The quantity split will be determined between the two contractors in the year of execution. LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 7 of 56 P-1 Line #1 Volume 1 - 7 === page 40 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E01100 / CTG, 5.56mm Blank, M200, Single Round [A080] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Complete Round Prior Years Deliveries: 159462522 1 2025 AF (‡) 1.879 .000 1.879 A - - - .157 .157 .157 .157 .157 .157 .157 .157 .157 .157 .157 .157 1 2025 ARMY 38.913 .000 38.913 A - - - - - - - - - - - - - 3.243 3.243 1 2025 MC (‡) 5.582 .000 5.582 A - - - .465 .465 .465 .465 .465 .465 .465 .465 .465 .465 .465 .465 1 2025 Total 46.375 .000 46.375 - - - .622 .622 .622 .622 .622 .622 .622 .622 .622 .622 3.865 3.865 3.243 29.185 2 2025 ARMY 6.867 .000 6.867 A - - - - - - - - - - - - - .575 .575 .575 1 2026 AF (‡) 1.533 .000 1.533 A - - - - - - - 1.533 1 2026 ARMY 31.301 .000 31.301 A - - - - - - - 31.301 1 2026 MC (‡) 2.317 .000 2.317 A - - - - - - - 2.317 1 2026 Total 35.151 .000 35.151 - - - - - - - 35.151 3 2026 ARMY 5.524 .000 5.524 A - - - - - - - 5.524 1 2027 AF (‡) 7.828 .000 7.828 7.828 1 2027 ARMY 33.291 .000 33.291 33.291 1 2027 MC (‡) 3.685 .000 3.685 3.685 1 2027 Total 44.805 .000 44.805 44.805 4 2027 AF (‡) 1.381 .000 1.381 1.381 4 2027 ARMY 5.875 .000 5.875 5.875 4 2027 MC (‡) .650 .000 .650 .650 4 2027 Total 7.907 .000 7.907 7.907 O C T LI 0132E00700 - CTG, 5.56MM, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 56 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R A P R M A Y J U N J U L A U G - .000 3.243 29.185 - .000 5.141 S E P Volume 1 - 8 === page 41 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E01100 / CTG, 5.56mm Blank, M200, Single Round [A080] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N Calendar Year 2028 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Complete Round Prior Years Deliveries: 159462522 1 2025 AF (‡) 1.879 1.879 1 2025 ARMY 38.913 9.728 29.185 1 2025 MC (‡) 5.582 5.582 1 2025 Total 46.375 2 2025 ARMY 1 2026 AF 1 .000 - - - - - - - - - .000 3.243 3.243 3.243 3.243 3.243 3.243 3.243 3.243 3.243 .000 - - - - - - - - - 17.190 29.185 3.243 3.243 3.243 3.243 3.243 3.243 3.243 3.243 3.243 6.867 1.726 5.141 .575 .575 .575 .575 .575 .575 .575 .575 .539 (‡) 1.533 .000 1.533 - - - - - - .128 .128 2026 ARMY 31.301 .000 31.301 - - - - - - 2.608 1 2026 MC (‡) 2.317 .000 2.317 - - - - - - 1 2026 Total 35.151 .000 35.151 - - - - - 3 2026 ARMY 5.524 .000 5.524 - - - - - 1 2027 AF (‡) 7.828 .000 1 2027 ARMY 1 2027 MC (‡) 1 2027 4 2027 AF 4 2027 4 2027 MC 4 2027 .000 .000 - - - - - - - - - .128 .128 .128 .128 .128 .128 .128 .128 .128 .128 .000 2.608 2.608 2.608 2.608 2.608 2.608 2.608 2.608 2.608 2.608 2.608 .000 .193 .193 .193 .193 .193 .193 .193 .193 .193 .193 .193 .193 - 2.929 2.929 2.929 2.929 2.929 2.929 2.929 2.929 2.929 2.929 2.929 2.929 - .465 .465 .465 .465 .465 .465 .465 .465 .465 .465 .465 .413 7.828 A - - - - - - - - - - - - 33.291 .000 33.291 A - - - - - - - - - - - 3.685 .000 3.685 A - - - - - - - - - - - Total 44.805 .000 44.805 - - - - - - - - - - (‡) 1.381 .000 1.381 A - - - - - - - - - ARMY 5.875 .000 5.875 A - - - - - - - - - (‡) .650 .000 .650 A - - - - - - - - Total 7.907 .000 7.907 - - - - - - - - O C T LI 0132E00700 - CTG, 5.56MM, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N - - - - - - .000 .000 J U L A U G UNCLASSIFIED Page 9 of 56 S E P O C T N O V .000 - - - - - - .000 - .652 .652 .652 .652 .652 .652 3.914 - - 2.774 2.774 2.774 2.774 2.774 2.774 16.646 - - .307 .307 .307 .307 .307 .307 - - - 3.734 3.734 3.734 3.734 3.734 3.734 22.402 - - - - .115 .115 .115 .115 .115 .115 .691 - - - - .490 .490 .490 .490 .490 .490 2.937 - - - - - .054 .054 .054 .054 .054 .054 .325 - - - - - .659 .659 .659 .659 .659 .659 3.953 A P R M A Y J U N J U L A U G S E P D E C J A N F E B P-1 Line #1 M A R .000 1.843 Volume 1 - 9 === page 42 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E01100 / CTG, 5.56mm Blank, M200, Single Round [A080] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Complete Round Prior Years Deliveries: 159462522 1 2025 AF (‡) 1.879 1.879 .000 .000 1 2025 ARMY 38.913 38.913 .000 .000 1 2025 MC (‡) 5.582 5.582 .000 1 2025 Total 46.375 46.375 .000 2 2025 ARMY 6.867 6.867 .000 .000 1 2026 AF (‡) 1.533 1.533 .000 .000 1 2026 ARMY 31.301 31.301 .000 .000 1 2026 MC (‡) 2.317 2.317 .000 1 2026 Total 35.151 35.151 .000 3 2026 ARMY 5.524 5.524 .000 1 2027 AF (‡) 7.828 3.914 1 2027 ARMY 1 2027 MC 1 .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 3.914 .652 .652 .652 .652 .652 .652 .000 33.291 16.646 16.646 2.774 2.774 2.774 2.774 2.774 2.774 .000 (‡) 3.685 1.843 1.843 .307 .307 .307 .307 .307 .307 2027 Total 44.805 22.402 22.402 3.734 3.734 3.734 3.734 3.734 3.734 4 2027 AF (‡) 1.381 .691 .691 .115 .115 .115 .115 .115 .115 .000 4 2027 ARMY 5.875 2.937 2.937 .490 .490 .490 .490 .490 .490 .000 4 2027 MC (‡) .650 .325 .325 .054 .054 .054 .054 .054 .054 4 2027 Total 7.907 3.953 3.953 .659 .659 .659 .659 .659 .659 O C T N O V D E C J A N F E B M A R .000 LI 0132E00700 - CTG, 5.56MM, All Types Army .000 - - - - - - - - - - - - - - - - - - .000 .000 A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 56 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R A P R M A Y J U N J U L A U G - .000 S E P Volume 1 - 10 === page 43 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E01100 / CTG, 5.56mm Blank, M200, Single Round [A080] Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 OLIN WINCHESTER, LLC LCAAP - INDEPENDENCE, MO 100,000 5,700,000 14,200,000 6 6 13 19 6 6 13 19 2 OLIN WINCHESTER LLC OXFORD, MS 100,000 5,700,000 5,700,000 6 6 13 19 6 6 13 19 3 OLIN CORPORATION WINCHESTER - OXFORD, MS 100,000 5,700,000 14,200,000 6 6 13 19 6 6 13 19 4 TO BE SELECTED - TO BE SELECTED 2,280 5,700,000 14,200,000 6 6 13 19 6 6 13 19 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 11 of 56 P-1 Line #1 Volume 1 - 11 === page 44 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E01101 / CTG, 5.56mm Blank, M200 Linked f/SAW [A075] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 7.674 6.256 6.433 - 6.433 - Gross/Weapon System Cost ($ in Millions) 243.774 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 243.774 Plus CY Advance Procurement ($ in Millions) - - - - - 7.674 6.256 6.433 - 6.433 - Total Obligation Authority ($ in Millions) 243.774 FY 2027 Total - - - - - 7.674 6.256 6.433 - 6.433 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 0.23 241.289 0.35 Subtotal: Recurring Cost - - 241.515 - - 241.515 - Environmental Initiatives Subtotal: Support - Product Improvement Cost - - 0.135 - - Production Engineering - Subtotal: Support Production Engineering Cost - ROUND Subtotal: Hardware Cost 1,050,066K 20,154,369 7.151 0.42 - 7.151 - - 7.151 - - - - 0.135 - - - 2.335 - - 2.335 - 13,901,689 5.839 0.41 - 5.839 - - 5.839 - - - - - - - - 0.519 - - 0.519 - 14,446,307 5.919 - - - 0.41 14,446,307 5.919 - 5.919 - - - - - 5.919 - 5.919 - - - - - 5.919 - - - - - - - - - - - - - - - - - - - - 0.408 - - 0.506 - - - - - 0.506 - 0.408 - - 0.506 - - - - - 0.506 Support - Product Improvement Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.038 - - 0.005 - - 0.009 - - 0.009 - - - - - 0.009 Subtotal: Support - Quality Assurance Cost - - 0.038 - - 0.005 - - 0.009 - - 0.009 - - - - - 0.009 Gross/Weapon System Cost - - 243.774 - - 7.674 - - 6.256 - - 6.433 - - - - - 6.433 Remarks: FY 2027 funding increase due to economic adjustment and to meet munitions requirement. LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 12 of 56 P-1 Line #1 Volume 1 - 12 === page 45 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types ID Code (A=Service Ready, B=Not Service Ready) : A (†) Item Number / Title [DODIC]: E01101 / CTG, 5.56mm Blank, M200 Linked f/SAW [A075] MDAP/MAIS Code: indicates the presence of a P-5a LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 13 of 56 P-1 Line #1 Volume 1 - 13 === page 46 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E01101 / CTG, 5.56mm Blank, M200 Linked f/SAW [A075] Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Jun 2025 Jul 2026 20,154,369 0.36 Y 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Apr 2027 13,901,689 0.42 Y 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Apr 2028 14,446,307 0.41 Y RFP Issue Date indicates the presence of a P-21 LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 14 of 56 P-1 Line #1 Volume 1 - 14 === page 47 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E01101 / CTG, 5.56mm Blank, M200 Linked f/SAW [A075] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R S E P B A L A N C E .119 Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G COMPLETE ROUND Prior Years Deliveries: 1050065785 1 2025 AF (‡) .238 .238 A - - - - - - - - - - .020 .020 .020 .020 .020 .020 1 2025 ARMY 20.154 .000 20.154 A - - - - - - - - - - - - - 1.680 1.680 1.680 15.116 1 2025 Total 20.392 .000 20.392 - - - - - - - - - - .020 .020 .020 1.699 1.699 1.699 15.235 1 2026 AF (‡) 1.163 .000 1.163 A - - - - - - - 1.163 1 2026 ARMY 13.902 .000 13.902 A - - - - - - - 13.902 1 2026 Total 15.065 .000 15.065 - - - - - - - 15.065 1 2027 AF (‡) 1.763 .000 1.763 1.763 1 2027 ARMY 14.446 .000 14.446 14.446 1 2027 Total 16.209 .000 16.209 .000 16.209 O C T LI 0132E00700 - CTG, 5.56MM, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 56 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 15 === page 48 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E01101 / CTG, 5.56mm Blank, M200 Linked f/SAW [A075] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 1050065785 1 2025 AF (‡) .238 .119 .020 .020 .020 .020 .020 .020 - - - 1 2025 ARMY 20.154 5.039 15.116 1.680 1.680 1.680 1.680 1.680 1.680 1.680 1.680 1.680 1 2025 Total 20.392 5.157 15.235 1.699 1.699 1.699 1.699 1.699 1.699 1.680 1.680 1.680 - - - - - - - - - 1 2026 AF (‡) 1.163 .000 1.163 - - - - - - .097 .097 .097 .097 .097 .097 .097 .097 .097 .097 .097 .097 1 2026 ARMY 13.902 .000 13.902 - - - - - - 1.158 1.158 1.158 1.158 1.158 1.158 1.158 1.158 1.158 1.158 1.158 1.158 1 2026 Total 15.065 .000 15.065 - - - - - - 1.255 1.255 1.255 1.255 1.255 1.255 1.255 1.255 1.255 1.255 1.255 1.255 - - - - - - 1 2027 AF (‡) 1.763 .000 1.763 A - - - - - - - - - - - - - .147 .147 .147 .147 .147 .147 .882 1 2027 ARMY 14.446 .000 14.446 A - - - - - - - - - - - - - 1.204 1.204 1.204 1.204 1.204 1.204 7.223 1 2027 Total 16.209 .000 16.209 - 1.351 1.351 1.351 1.351 1.351 1.351 8.105 A P R M A Y J U N J U L A U G S E P .119 O C T LI 0132E00700 - CTG, 5.56MM, All Types Army N O V D E C J A N F E B M A R A P R M A Y .000 .000 J U N J U L A U G UNCLASSIFIED Page 16 of 56 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R - - - - - - .000 .000 .000 .000 Volume 1 - 16 === page 49 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E01101 / CTG, 5.56mm Blank, M200 Linked f/SAW [A075] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 1050065785 1 2025 AF (‡) .238 .238 .000 1 2025 ARMY 20.154 20.154 .000 1 2025 Total 20.392 20.392 .000 1 2026 AF (‡) 1.163 1.163 .000 1 2026 ARMY 13.902 13.902 .000 1 2026 Total 15.065 15.065 .000 - - - - - - 1 2027 AF (‡) 1.763 .882 .882 .147 .147 .147 .147 .147 .147 1 2027 ARMY 14.446 7.223 7.223 1.204 1.204 1.204 1.204 1.204 1.204 1 2027 Total 16.209 8.105 8.105 1.351 1.351 1.351 1.351 1.351 1.351 O C T N O V D E C J A N F E B M A R .000 .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 .000 .000 LI 0132E00700 - CTG, 5.56MM, All Types Army - - - - - - - - - - - - - - - - - - .000 .000 .000 A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 56 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R A P R M A Y J U N J U L A U G - .000 S E P Volume 1 - 17 === page 50 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E01101 / CTG, 5.56mm Blank, M200 Linked f/SAW [A075] Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 OLIN WINCHESTER, LLC LCAAP - INDEPENDENCE, MO MSR For 2027 1-8-5 For 2027 MAX For 2027 1,680 5,700,000 67,500,000 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 6 13 Total After Oct 1 ALT Prior to Oct 1 19 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 13 19 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 18 of 56 P-1 Line #1 Volume 1 - 18 === page 51 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E04607 / CTG, 5.56mm 4 Ball EPR, M855A1 /1 TR M856A1 Linked [AB73] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 11.910 12.677 12.915 - 12.915 - Gross/Weapon System Cost ($ in Millions) 112.373 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 112.373 Plus CY Advance Procurement ($ in Millions) - - - - - 11.910 12.677 12.915 - 12.915 - Total Obligation Authority ($ in Millions) 112.373 FY 2027 Total - - - - - 11.910 12.677 12.915 - 12.915 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Qty Total Cost 280,619K 107.504 0.59 (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 0.38 Subtotal: Recurring Cost - - 107.477 - - - 107.477 - Production Verification Test - - 0.005 Subtotal: Support - Product Improvement Cost - - Production Engineering - Subtotal: Support Production Engineering Cost - ROUND Subtotal: Hardware Cost 18,584,227 10.903 0.68 - 10.903 - - 10.903 - - - 0.277 0.005 - - - 4.830 - - 4.830 - 17,465,208 11.876 0.68 - 11.876 - - 11.876 - - - - 0.277 - - - 0.725 - - 0.725 - 17,753,255 12.072 - - - 0.68 17,753,255 12.072 - 12.072 - - - - - 12.072 - 12.072 - - - - - 12.072 - - - - - - - - - - - - - - - - - - - - 0.796 - - 0.838 - - - - - 0.838 - 0.796 - - 0.838 - - - - - 0.838 Support - Product Improvement Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.061 - - 0.005 - - 0.005 - - 0.005 - - - - - 0.005 Subtotal: Support - Quality Assurance Cost - - 0.061 - - 0.005 - - 0.005 - - 0.005 - - - - - 0.005 Gross/Weapon System Cost - - 112.373 - - 11.910 - - 12.677 - - 12.915 - - - - - 12.915 Remarks: LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 19 of 56 P-1 Line #1 Volume 1 - 19 === page 52 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types ID Code (A=Service Ready, B=Not Service Ready) : A FY 2026 and FY 2027 unit cost includes full Economic Price Adjustments due to increases in commodity prices. (†) Item Number / Title [DODIC]: E04607 / CTG, 5.56mm 4 Ball EPR, M855A1 /1 TR M856A1 Linked [AB73] MDAP/MAIS Code: indicates the presence of a P-5a LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 20 of 56 P-1 Line #1 Volume 1 - 20 === page 53 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E04607 / CTG, 5.56mm 4 Ball EPR, M855A1 /1 TR M856A1 Linked [AB73] Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Jun 2025 Jul 2026 18,584,227 0.59 Y 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Apr 2027 17,465,208 0.68 Y 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Apr 2028 17,753,255 0.68 Y RFP Issue Date indicates the presence of a P-21 LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 21 of 56 P-1 Line #1 Volume 1 - 21 === page 54 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E04607 / CTG, 5.56mm 4 Ball EPR, M855A1 /1 TR M856A1 Linked [AB73] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R S E P B A L A N C E .368 Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G COMPLETE ROUND Prior Years Deliveries: 280618958 1 2025 AF (‡) .736 .736 A - - - - - - - - - - .061 .061 .061 .061 .061 .061 1 2025 ARMY 18.584 .000 18.584 A - - - - - - - - - - - - - 1.549 1.549 1.549 13.938 1 2025 Total 19.320 .000 19.320 - - - - - - - - - 1.610 14.306 1 2026 AF (‡) .722 1 2026 ARMY 1 2026 1 2027 .000 - .061 .061 .061 1.610 1.610 .722 A - - - - - - - .722 17.465 .000 17.465 A - - - - - - - 17.465 Total 18.188 .000 18.188 - - - - - - - 18.188 ARMY 17.753 .000 17.753 .000 17.753 O C T LI 0132E00700 - CTG, 5.56MM, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 22 of 56 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 22 === page 55 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E04607 / CTG, 5.56mm 4 Ball EPR, M855A1 /1 TR M856A1 Linked [AB73] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 280618958 1 2025 AF (‡) .736 .368 .061 .061 .061 .061 .061 .061 - - - 1 2025 ARMY 18.584 4.646 13.938 1.549 1.549 1.549 1.549 1.549 1.549 1.549 1.549 1.549 1 2025 Total 19.320 5.014 14.306 1.610 1.610 1.610 1.610 1.610 1.610 1.549 1.549 1.549 - - - - - - - - - 1 2026 AF (‡) .722 .722 - - - - - - .060 .060 .060 .060 .060 .060 .060 .060 .060 .060 .060 .060 1 2026 ARMY 17.465 .000 17.465 - - - - - - 1.455 1.455 1.455 1.455 1.455 1.455 1.455 1.455 1.455 1.455 1.455 1.455 1 2026 Total 18.188 .000 18.188 - - - - - - 1.516 1.516 1.516 1.516 1.516 1.516 1.516 1.516 1.516 1.516 1.516 1.516 - - - - - - .000 1 2027 ARMY 17.753 .000 17.753 A - - - - - - - - - - - - - 1.479 1.479 1.479 1.479 1.479 1.479 8.877 A P R M A Y J U N J U L A U G S E P .368 .000 O C T LI 0132E00700 - CTG, 5.56MM, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N .000 .000 J U L A U G UNCLASSIFIED Page 23 of 56 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R - - - - - - .000 .000 .000 Volume 1 - 23 === page 56 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E04607 / CTG, 5.56mm 4 Ball EPR, M855A1 /1 TR M856A1 Linked [AB73] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 280618958 1 2025 AF (‡) .736 .736 .000 1 2025 ARMY 18.584 18.584 .000 1 2025 Total 19.320 19.320 .000 1 2026 AF (‡) .722 .722 .000 1 2026 ARMY 17.465 17.465 .000 1 2026 Total 18.188 18.188 .000 - - - - - - 1 2027 ARMY 17.753 8.877 8.877 1.479 1.479 1.479 1.479 1.479 1.479 O C T N O V D E C J A N F E B M A R .000 .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 .000 .000 LI 0132E00700 - CTG, 5.56MM, All Types Army - - - - - - - - - - - - - - - - - - .000 .000 A P R M A Y J U N J U L A U G UNCLASSIFIED Page 24 of 56 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 24 === page 57 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E04607 / CTG, 5.56mm 4 Ball EPR, M855A1 /1 TR M856A1 Linked [AB73] Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 OLIN WINCHESTER, LLC LCAAP - INDEPENDENCE, MO MSR For 2027 1-8-5 For 2027 MAX For 2027 1,600 5,143,040 9,771,776 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 6 13 Total After Oct 1 ALT Prior to Oct 1 19 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 13 19 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 25 of 56 P-1 Line #1 Volume 1 - 25 === page 58 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E04608 / CTG, 5.56mm Tracer, M856A1 Single Round [AB74] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 13.004 0.494 2.425 2.100 - 2.100 - - - - - - 13.004 0.494 2.425 2.100 - 2.100 - - - - - - 13.004 0.494 2.425 2.100 - 2.100 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Qty ($) FY 2025 Total Cost (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost (†) 12.219 0.86 0.494 0.85 2.261 0.86 1.971 - - - 0.86 - - 12.221 - - 0.494 - - 2.261 - - 1.971 - - - - - 1.971 - - 12.221 - - 0.494 - - 2.261 - - 1.971 - - - - - 1.971 Production Engineering - - 0.775 - - - - - 0.164 - - 0.129 - - - - - 0.129 Subtotal: Support Production Engineering Cost - - 0.775 - - - - - 0.164 - - 0.129 - - - - - 0.129 Complete Round Subtotal: Recurring Cost Subtotal: Hardware Cost 2.78 4,394,341 574,806 2,660,332 2,291,938 2,291,938 1.971 Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.009 - - - - - - - - - - - - - - - Subtotal: Support - Quality Assurance Cost - - 0.009 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 13.004 - - 0.494 - - 2.425 - - 2.100 - - - - - 2.100 (†) indicates the presence of a P-5a LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 26 of 56 P-1 Line #1 Volume 1 - 26 === page 59 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements Complete Round Complete Round Complete Round O O C P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Apr 2027 574,806 0.86 Y 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Apr 2027 2,660,332 0.85 Y 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Apr 2028 2,291,938 0.86 Y LI 0132E00700 - CTG, 5.56MM, All Types Army Location of PCO Item Number / Title [DODIC]: E04608 / CTG, 5.56mm Tracer, M856A1 Single Round [AB74] UNCLASSIFIED Page 27 of 56 P-1 Line #1 RFP Issue Date Volume 1 - 27 === page 60 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E95200 / CTG, 5.56mm EPR Ball, M855A1 w/M27 Link f/SAW [AB56] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 39.105 4.664 4.755 2.943 - 2.943 - - - - - - 39.105 4.664 4.755 2.943 - 2.943 - - - - - - 39.105 4.664 4.755 2.943 - 2.943 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Qty ($) FY 2025 Total Cost (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost (†) 35.735 0.52 4.340 0.60 4.403 0.61 2.738 - - - 0.61 - - 35.742 - - 4.374 - - 4.403 - - 2.738 - - - - - 2.738 - - 35.742 - - 4.374 - - 4.403 - - 2.738 - - - - - 2.738 Production Engineering - - 3.321 - - 0.285 - - 0.347 - - 0.200 - - - - - 0.200 Subtotal: Support Production Engineering Cost - - 3.321 - - 0.285 - - 0.347 - - 0.200 - - - - - 0.200 Complete Round Subtotal: Recurring Cost Subtotal: Hardware Cost 0.38 93,077,039 8,356,392 7,338,271 4,518,023 4,518,023 2.738 Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.036 - - 0.005 - - 0.005 - - 0.005 - - - - - 0.005 Subtotal: Support - Quality Assurance Cost - - 0.036 - - 0.005 - - 0.005 - - 0.005 - - - - - 0.005 Gross/Weapon System Cost - - 39.105 - - 4.664 - - 4.755 - - 2.943 - - - - - 2.943 Remarks: FY 2026 and FY 2027 unit cost includes full Economic Price Adjustments due to increases in commodity prices. (†) indicates the presence of a P-5a LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 28 of 56 P-1 Line #1 Volume 1 - 28 === page 61 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements Complete Round Complete Round Complete Round Complete Round Complete Round Complete Round O O C P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E95200 / CTG, 5.56mm EPR Ball, M855A1 w/M27 Link f/SAW [AB56] Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Jun 2025 Jul 2026 7,102,934 0.59 Y 2025 OLIN CORPORATION WINCHESTER / OXFORD, MS Option / FFP ROCK ISLAND ARSENAL, IL Jun 2025 Jul 2026 1,253,458 0.59 Y 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Apr 2027 6,237,530 0.60 Y 2026 OLIN CORPORATION WINCHESTER / OXFORD, MS Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Apr 2027 1,100,741 0.60 Y 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Apr 2028 3,840,320 0.60 Y 2027 TO BE SELECTED / TO BE SELECTED C / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Apr 2028 677,703 0.60 Y RFP Issue Date Remarks: Complete round is an average unit cost between two contractors. The quantity split will be determined between the two contractors in the year of execution. LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 29 of 56 P-1 Line #1 Volume 1 - 29 === page 62 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E95400 / CTG, 5.56mm Ball, M855A1 EPR, Clipped Mil Pack [AB57] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 0.524 11.663 53.793 - 53.793 - Gross/Weapon System Cost ($ in Millions) 859.253 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 859.253 Plus CY Advance Procurement ($ in Millions) - - - - - 0.524 11.663 53.793 - 53.793 - Total Obligation Authority ($ in Millions) 859.253 FY 2027 Total - - - - - 0.524 11.663 53.793 - 53.793 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Qty ($) FY 2025 Total Cost (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost (†) 840.225 0.43 0.470 0.49 10.781 0.49 49.690 - - - 0.49 - - 840.225 - - 0.470 - - 10.781 - - 49.690 - - - - - 49.690 - - 840.225 - - 0.470 - - 10.781 - - 49.690 - - - - - 49.690 Acceptance Test - - 0.235 - - - - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 0.235 - - - - - - - - - - - - - - - - - 0.118 - - - - - - - - - - - - - - - - - 0.118 - - - - - - - - - - - - - - - Environmental Initiatives - - 1.354 - - - - - - - - - - - - - - - Reliability - - 0.124 - - - - - - - - - - - - - - - - - 1.478 - - - - - - - - - - - - - - - - - 17.200 - - 0.046 - - 0.872 - - 3.937 - - - - - 3.937 Complete Round 10.10 Subtotal: Recurring Cost Subtotal: Hardware Cost 83,174,170 1,094,487 22,001,306 101,408K 101,408K 49.690 Support - Acceptance Testing Cost Support - Engineering Change Proposals Cost Engineering Change Proposals Subtotal: Support Engineering Change Proposals Cost Support - Product Improvement Cost Subtotal: Support - Product Improvement Cost Support - Production Engineering Cost Production Engineering LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 30 of 56 P-1 Line #1 Volume 1 - 30 === page 63 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E95400 / CTG, 5.56mm Ball, M855A1 EPR, Clipped Mil Pack [AB57] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Subtotal: Support Production Engineering Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 17.200 - - 0.046 - - 0.872 - - 3.937 - - - - - 3.937 Support - Quality Assurance Cost Quality Assurance - - 0.048 - - 0.008 - - 0.010 - - 0.010 - - - - - 0.010 Subtotal: Support - Quality Assurance Cost - - 0.048 - - 0.008 - - 0.010 - - 0.010 - - - - - 0.010 Gross/Weapon System Cost - - 859.253 - - 0.524 - - 11.663 - - 53.793 - - - - - 53.793 Remarks: FY 2026 to FY 2027 funding request increase to meet munitions / war stock requirement. Increase off-set by reduction on clipped pack variant. (†) indicates the presence of a P-5a LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 31 of 56 P-1 Line #1 Volume 1 - 31 === page 64 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (†) Complete Round (†) Complete Round (†) Complete Round (†) Complete Round (†) Complete Round (†) Complete Round (†) O O C P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E95400 / CTG, 5.56mm Ball, M855A1 EPR, Clipped Mil Pack [AB57] Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 OLIN CORPORATION WINCHESTER / OXFORD, MS Option / FFP ROCK ISLAND ARSENAL, IL Jun 2025 Jul 2026 164,173 0.48 Y 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Jun 2025 Jul 2026 930,314 0.48 Y 2026 OLIN CORPORATION WINCHESTER / OXFORD, MS Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Apr 2027 3,300,196 0.49 Y 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Apr 2027 18,701,110 0.49 Y 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Apr 2028 86,196,604 0.49 Y 2027 TO BE SELECTED / TO BE SELECTED C / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Apr 2028 15,211,165 0.49 Y RFP Issue Date indicates the presence of a P-21 Remarks: Complete round is an average unit cost between two contractors. The quantity split will be determined between the two contractors in the year of execution. LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 32 of 56 P-1 Line #1 Volume 1 - 32 === page 65 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E95400 / CTG, 5.56mm Ball, M855A1 EPR, Clipped Mil Pack [AB57] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R J U L A U G S E P B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N Complete Round Prior Years Deliveries: 83174170 1 2025 AF (‡) .075 .000 .075 A - - - - - - - - - - .006 .006 .006 .006 .006 .006 .038 1 2025 ARMY .164 .000 .164 A - - - - - - - - - - - - - .014 .014 .014 .123 .304 .000 .304 A - - - - - - - - - - .025 .025 .025 .025 .025 .025 .152 NAVSEA 1 2025 1 2025 NSOF .063 .000 .063 A - - - - - - - - - - .005 .005 .005 .005 .005 .005 .032 1 2025 Total .606 .000 .606 - - - - - - - - - - .037 .037 .037 .051 .051 .051 .344 2 2025 AF (‡) .427 .000 .427 A - - - - - - - - - - .036 .036 .036 .036 .036 .036 .213 2 2025 ARMY .930 .000 .930 A - - - - - - - - - - - - - .078 .078 .078 .698 1.721 .000 1.721 A - - - - - - - - - - .143 .143 .143 .143 .143 .143 .860 (‡) (‡) NAVSEA 2 2025 2 2025 NSOF 2 2025 Total 1 2026 AF 1 2026 1 2026 (‡) (‡) .358 .000 .358 A - - - - - - - - - - .030 .030 .030 .030 .030 .030 .179 3.436 .000 3.436 - - - - - - - - - - .209 .209 .209 .286 .286 .286 1.951 (‡) .003 .000 .003 A - - - - - - - .003 ARMY 3.300 .000 3.300 A - - - - - - - 3.300 .306 .000 .306 A - - - - - - - .306 NAVSEA (‡) 1 2026 NSOF 1 2026 Total 2 2026 AF 2 2026 2 2026 (‡) .203 .000 .203 A - - - - - - - .203 3.812 .000 3.812 - - - - - - - 3.812 (‡) .017 .000 .017 A - - - - - - - .017 ARMY 18.701 .000 18.701 A - - - - - - - 18.701 1.731 .000 1.731 A - - - - - - - 1.731 NAVSEA (‡) (‡) 2 2026 NSOF 1.152 .000 1.152 A - - - - - - - 1.152 2 2026 Total 21.601 .000 21.601 - - - - - - - 21.601 2 2027 ARMY 86.197 .000 86.197 86.197 1.758 .000 1.758 1.758 1.678 .000 1.678 1.678 89.632 .000 89.632 89.632 NAVSEA 2 2027 2 2027 NSOF 2 2027 Total (‡) (‡) O C T LI 0132E00700 - CTG, 5.56MM, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 33 of 56 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 33 === page 66 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C Fiscal Year 2025 SERVICE PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT ARMY 15.211 .000 15.211 M F R # FY 3 2027 3 2027 3 2027 NSOF 3 2027 Total NAVSEA (‡) (‡) Item Number / Title [DODIC]: E95400 / CTG, 5.56mm Ball, M855A1 EPR, Clipped Mil Pack [AB57] Fiscal Year 2026 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 15.211 .310 .000 .310 .296 .000 .296 .296 .000 15.817 15.817 15.817 .310 O C T LI 0132E00700 - CTG, 5.56MM, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 34 of 56 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 34 === page 67 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E95400 / CTG, 5.56mm Ball, M855A1 EPR, Clipped Mil Pack [AB57] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Complete Round Prior Years Deliveries: 83174170 1 2025 AF (‡) .075 .038 .038 .006 .006 .006 .006 .006 .006 - - - .000 1 2025 ARMY .164 .041 .123 .014 .014 .014 .014 .014 .014 .014 .014 .014 .000 .304 .152 .152 .025 .025 .025 .025 .025 .025 - - - .000 NAVSEA 1 2025 1 2025 NSOF .063 .032 .032 .005 .005 .005 .005 .005 .005 - - - 1 2025 Total .606 .262 .344 .051 .051 .051 .051 .051 .051 .014 .014 .014 2 2025 AF (‡) .427 .213 .213 .036 .036 .036 .036 .036 .036 - - - .000 2 2025 ARMY .930 .233 .698 .078 .078 .078 .078 .078 .078 .078 .078 .078 .000 1.721 .860 .860 .143 .143 .143 .143 .143 .143 - - - .000 (‡) (‡) NAVSEA .000 - - - - - - - - - - - - - - - .000 2 2025 2 2025 NSOF .358 .179 .179 .030 .030 .030 .030 .030 .030 - - - 2 2025 Total 3.436 1.485 1.951 .286 .286 .286 .286 .286 .286 .078 .078 .078 - - - - - - - - - 1 2026 AF (‡) .003 .000 .003 - - - - - - * * * * * * * * * * * * .000 1 2026 ARMY 3.300 .000 3.300 - - - - - - .275 .275 .275 .275 .275 .275 .275 .275 .275 .275 .275 .275 .000 .306 .000 .306 - - - - - - .025 .025 .025 .025 .025 .025 .025 .025 .025 .025 .025 .025 .000 1 2026 (‡) (‡) NAVSEA (‡) (‡) .000 - - - - - - .000 1 2026 NSOF .203 .000 .203 - - - - - - .017 .017 .017 .017 .017 .017 .017 .017 .017 .017 .017 .017 1 2026 Total 3.812 .000 3.812 - - - - - - .318 .318 .318 .318 .318 .318 .318 .318 .318 .318 .318 .318 2 2026 AF (‡) .017 .000 .017 - - - - - - .001 .001 .001 .001 .001 .001 .001 .001 .001 .001 .001 .001 .000 2 2026 ARMY 18.701 .000 18.701 - - - - - - 1.558 1.558 1.558 1.558 1.558 1.558 1.558 1.558 1.558 1.558 1.558 1.558 .000 1.731 .000 1.731 - - - - - - .144 .144 .144 .144 .144 .144 .144 .144 .144 .144 .144 .144 .000 2 2026 NAVSEA (‡) (‡) .000 - - - - - - .000 2 2026 NSOF 1.152 .000 1.152 - - - - - - .096 .096 .096 .096 .096 .096 .096 .096 .096 .096 .096 .096 2 2026 Total 21.601 .000 21.601 - - - - - - 1.800 1.800 1.800 1.800 1.800 1.800 1.800 1.800 1.800 1.800 1.800 1.800 - - - - - 2 2027 ARMY 86.197 .000 86.197 A - - - - - - - - - - - - - 7.183 7.183 7.183 7.183 7.183 7.183 43.098 2 2027 1.758 .000 1.758 A - - - - - - - - - - - - - .147 .147 .147 .147 .147 .147 .879 2 2027 NSOF 1.678 .000 1.678 A - - - - - - - - - - - - - .140 .140 .140 .140 .140 .140 .839 2 2027 Total 89.632 .000 89.632 - - - - - - - - - - - - - 7.469 7.469 7.469 7.469 7.469 7.469 44.816 A P R M A Y J U N J U L A U G S E P NAVSEA (‡) (‡) O C T LI 0132E00700 - CTG, 5.56MM, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 35 of 56 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R .000 - .000 Volume 1 - 35 === page 68 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C Fiscal Year 2027 SERVICE PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT ARMY 15.211 M F R # FY 3 2027 3 2027 3 2027 NSOF 3 2027 Total NAVSEA (‡) (‡) Item Number / Title [DODIC]: E95400 / CTG, 5.56mm Ball, M855A1 EPR, Clipped Mil Pack [AB57] Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R A P R M A Y J U N J U L A U G S E P B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R .000 15.211 A - - - - - - - - - - - - - 1.268 1.268 1.268 1.268 1.268 1.268 7.606 .310 .000 .310 A - - - - - - - - - - - - - .026 .026 .026 .026 .026 .026 .155 .296 .000 .296 A - - - - - - - - - - - - - .025 .025 .025 .025 .025 .025 .148 .000 15.817 - - - - - - - - - - - - - 1.318 1.318 1.318 1.318 1.318 1.318 7.909 A P R M A Y J U N J U L A U G S E P 15.817 O C T LI 0132E00700 - CTG, 5.56MM, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 36 of 56 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R Volume 1 - 36 === page 69 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E95400 / CTG, 5.56mm Ball, M855A1 EPR, Clipped Mil Pack [AB57] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Complete Round Prior Years Deliveries: 83174170 1 2025 AF (‡) .075 .075 .000 .000 1 2025 ARMY .164 .164 .000 .000 .304 .304 .000 .000 NAVSEA 1 2025 1 2025 NSOF .063 .063 .000 1 2025 Total .606 .606 .000 2 2025 AF (‡) .427 .427 .000 .000 2 2025 ARMY .930 .930 .000 .000 1.721 1.721 .000 .000 (‡) (‡) NAVSEA .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 2 2025 2 2025 NSOF .358 .358 .000 2 2025 Total 3.436 3.436 .000 1 2026 AF (‡) .003 .003 .000 .000 1 2026 ARMY 3.300 3.300 .000 .000 .306 .306 .000 .000 1 2026 (‡) (‡) NAVSEA (‡) (‡) .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 1 2026 NSOF .203 .203 .000 1 2026 Total 3.812 3.812 .000 2 2026 AF (‡) .017 .017 .000 .000 2 2026 ARMY 18.701 18.701 .000 .000 1.731 1.731 .000 .000 2 2026 NAVSEA (‡) (‡) 2 2026 NSOF 1.152 1.152 .000 2 2026 Total 21.601 21.601 .000 2 2027 ARMY 86.197 43.098 43.098 NAVSEA 2 2027 2 2027 NSOF 2 2027 Total (‡) (‡) 1.758 1.678 89.632 .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 .000 - - - - - - 7.183 7.183 7.183 7.183 7.183 7.183 .000 .147 .147 .147 .147 .147 .147 .000 .879 .879 .839 .839 .140 .140 .140 .140 .140 .140 44.816 44.816 7.469 7.469 7.469 7.469 7.469 7.469 O C T N O V D E C J A N F E B M A R LI 0132E00700 - CTG, 5.56MM, All Types Army - - - - - - - - - - - - - - - - - - .000 .000 A P R M A Y J U N J U L A U G UNCLASSIFIED Page 37 of 56 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R A P R M A Y J U N J U L A U G - .000 S E P Volume 1 - 37 === page 70 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT M F R # FY SERVICE PROC QTY 3 2027 ARMY 15.211 7.606 3 2027 .310 .155 3 2027 NSOF 3 2027 Total NAVSEA (‡) (‡) Item Number / Title [DODIC]: E95400 / CTG, 5.56mm Ball, M855A1 EPR, Clipped Mil Pack [AB57] Calendar Year 2029 N O V D E C J A N F E B M A R 7.606 1.268 1.268 1.268 1.268 1.268 1.268 .000 .155 .026 .026 .026 .026 .026 .026 .000 .296 .148 .148 .025 .025 .025 .025 .025 .025 7.909 7.909 1.318 1.318 1.318 1.318 1.318 1.318 O C T N O V D E C J A N F E B M A R LI 0132E00700 - CTG, 5.56MM, All Types Army M A Y J U N J U L Calendar Year 2030 O C T 15.817 A P R B A L A N C E Fiscal Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P .000 A P R M A Y J U N J U L A U G UNCLASSIFIED Page 38 of 56 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R A P R M A Y J U N J U L A U G - .000 S E P Volume 1 - 38 === page 71 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E95400 / CTG, 5.56mm Ball, M855A1 EPR, Clipped Mil Pack [AB57] Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 OLIN CORPORATION WINCHESTER - OXFORD, MS 10,000 5,700,000 14,200,000 9 9 15 24 6 6 13 19 2 OLIN WINCHESTER, LLC LCAAP - INDEPENDENCE, MO 10,000 5,700,000 14,200,000 9 9 15 24 6 6 13 19 3 TO BE SELECTED - TO BE SELECTED 1,680 5,700,000 14,200,000 6 6 13 19 6 6 13 19 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 39 of 56 P-1 Line #1 Volume 1 - 39 === page 72 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E95700 / CTG, 5.56mm Ball, M855A1 Clipped Bulk Pack [AB77] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 39.808 68.471 13.474 - 13.474 - Gross/Weapon System Cost ($ in Millions) 356.169 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 356.169 Plus CY Advance Procurement ($ in Millions) - - - - - 39.808 68.471 13.474 - 13.474 - Total Obligation Authority ($ in Millions) 356.169 FY 2027 Total - - - - - 39.808 68.471 13.474 - 13.474 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Qty Total Cost 442,282K 332.596 0.46 (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 0.75 36.330 0.47 Subtotal: Recurring Cost - - 332.596 - - - 332.596 - - 36.330 - - 36.330 - Acceptance Test - - 0.159 Subtotal: Support Acceptance Testing Cost - - 0.115 - - 0.159 - - - - 0.447 - - - 0.447 Environmental Initiatives - - Safety - - - - ROUND Subtotal: Hardware Cost 78,978,245 133,694K 62.836 0.46 - 62.836 - - 62.836 - - - 0.115 0.115 - - - 2.765 - - - 2.765 1.267 - - 0.420 - - - 1.687 - - 21.298 - 20,878,745 9.604 - - - 0.46 20,878,745 9.604 - 9.604 - - - - - 9.604 - 9.604 - - - - - 9.604 - - 0.115 - - - - - 0.115 0.115 - - 0.115 - - - - - 0.115 - 0.351 - - 0.918 - - - - - 0.918 - - 0.351 - - 0.918 - - - - - 0.918 0.175 - - 0.180 - - 0.181 - - - - - 0.181 - - - - - - 1.780 - - - - - 1.780 - 0.175 - - 0.180 - - 1.961 - - - - - 1.961 - 0.414 - - 4.979 - - 0.805 - - - - - 0.805 Support - Acceptance Testing Cost Support - Engineering Change Proposals Cost Engineering Change Proposals Subtotal: Support Engineering Change Proposals Cost Support - Product Improvement Cost Subtotal: Support - Product Improvement Cost Support - Production Engineering Cost Production Engineering LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 40 of 56 P-1 Line #1 Volume 1 - 40 === page 73 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E95700 / CTG, 5.56mm Ball, M855A1 Clipped Bulk Pack [AB77] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Subtotal: Support Production Engineering Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 21.298 - - 0.414 - - 4.979 - - 0.805 - - - - - 0.805 Support - Quality Assurance Cost Quality Assurance - - 0.092 - - 0.009 - - 0.009 - - 0.010 - - - - - 0.010 Subtotal: Support - Quality Assurance Cost - - 0.092 - - 0.009 - - 0.009 - - 0.010 - - - - - 0.010 Gross/Weapon System Cost - - 356.169 - - 39.808 - - 68.471 - - 13.474 - - - - - 13.474 Remarks: FY 2026 to FY 2027 funding request decreased due to reduction in munitions requirement. Decrease off-set by increase to the mil-pack variant. (†) indicates the presence of a P-5a LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 41 of 56 P-1 Line #1 Volume 1 - 41 === page 74 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E95700 / CTG, 5.56mm Ball, M855A1 Clipped Bulk Pack [AB77] Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Jun 2025 Jul 2026 78,978,245 0.46 Y 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Apr 2027 133,694K 0.47 Y 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Apr 2028 20,878,745 0.46 Y RFP Issue Date indicates the presence of a P-21 LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 42 of 56 P-1 Line #1 Volume 1 - 42 === page 75 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E95700 / CTG, 5.56mm Ball, M855A1 Clipped Bulk Pack [AB77] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 442281979 1 2025 ARMY 78.978 .000 78.978 1 2026 ARMY 133.694 .000 133.694 1 2027 ARMY 20.879 .000 20.879 A - - - - - - - - - - - - - 6.582 6.582 A - - - - - - 6.582 59.234 - 133.694 20.879 O C T LI 0132E00700 - CTG, 5.56MM, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 43 of 56 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 43 === page 76 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E95700 / CTG, 5.56mm Ball, M855A1 Clipped Bulk Pack [AB77] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT O C T Fiscal Year 2028 Calendar Year 2027 N O V D E C J A N F E B M A R A P R M A Y J U N J U L 6.582 6.582 6.582 Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND Prior Years Deliveries: 442281979 1 2025 ARMY 78.978 19.745 59.234 6.582 6.582 6.582 6.582 6.582 6.582 1 2026 ARMY 133.694 .000 133.694 - - - - - - 1 2027 ARMY 20.879 .000 20.879 A O C T LI 0132E00700 - CTG, 5.56MM, All Types Army N O V D E C J A N F E B M A R .000 11.141 11.141 11.141 11.141 11.141 11.141 11.141 11.141 11.141 11.141 11.141 11.141 A P R M A Y J U N J U L A U G UNCLASSIFIED Page 44 of 56 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R .000 1.740 1.740 1.740 1.740 1.740 1.740 10.439 A P R M A Y J U N J U L A U G S E P Volume 1 - 44 === page 77 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E95700 / CTG, 5.56mm Ball, M855A1 Clipped Bulk Pack [AB77] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND Prior Years Deliveries: 442281979 1 2025 ARMY 78.978 78.978 .000 1 2026 ARMY 133.694 133.694 .000 1 2027 ARMY 20.879 10.439 10.439 .000 .000 1.740 1.740 1.740 1.740 1.740 1.740 O C T N O V D E C J A N F E B M A R LI 0132E00700 - CTG, 5.56MM, All Types Army .000 A P R M A Y J U N J U L A U G UNCLASSIFIED Page 45 of 56 S E P O C T N O V D E C J A N F E B P-1 Line #1 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 45 === page 78 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E95700 / CTG, 5.56mm Ball, M855A1 Clipped Bulk Pack [AB77] Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 OLIN WINCHESTER, LLC LCAAP - INDEPENDENCE, MO MSR For 2027 1-8-5 For 2027 MAX For 2027 900 19,400,000 67,500,000 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 6 13 Total After Oct 1 ALT Prior to Oct 1 19 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 13 19 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 46 of 56 P-1 Line #1 Volume 1 - 46 === page 79 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E96110 / CTG, 5.56mm Marking, M1042 (Blue) [AC39] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 33.006 2.953 5.014 5.139 - 5.139 - - - - - - 33.006 2.953 5.014 5.139 - 5.139 - - - - - - 33.006 2.953 5.014 5.139 - 5.139 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Qty ($) FY 2025 Total Cost (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost (†) 30.248 0.76 2.891 0.81 4.684 0.83 4.798 - - - 0.83 - - 30.239 - - 2.891 - - 4.684 - - 4.821 - - - - - 4.821 - - 30.239 - - 2.891 - - 4.684 - - 4.821 - - - - - 4.821 Production Qualification Test - - 0.080 - - - - - - - - - - - - - - - Subtotal: Support - Product Improvement Cost - - 0.080 - - - - - - - - - - - - - - - Complete Round Subtotal: Recurring Cost Subtotal: Hardware Cost 0.72 41,882,209 3,808,532 5,782,351 5,781,318 5,781,318 4.798 Support - Product Improvement Cost Support - Production Engineering Cost Production Engineering - - 2.675 - - 0.062 - - 0.330 - - 0.318 - - - - - 0.318 Subtotal: Support Production Engineering Cost - - 2.675 - - 0.062 - - 0.330 - - 0.318 - - - - - 0.318 Gross/Weapon System Cost - - 33.006 - - 2.953 - - 5.014 - - 5.139 - - - - - 5.139 Remarks: FY 2026 and FY 2027 funding increase due to additional procurement of ammunition to meet training requirements. (†) indicates the presence of a P-5a LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 47 of 56 P-1 Line #1 Volume 1 - 47 === page 80 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements Complete Round Complete Round Complete Round O O C P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 ULTIMATE TRAINING MUNITIONS / BURY ST EDMUNDS, UNITED KINGDOM Option / FFP PICATINNY ARSENAL, NJ Jun 2025 Aug 2026 3,808,532 0.76 Y 2026 ULTIMATE TRAINING MUNITIONS / BURY ST EDMUNDS, UNITED KINGDOM Option / FFP PICATINNY ARSENAL, NJ Jul 2026 Sep 2027 5,782,351 0.81 Y 2027 ULTIMATE TRAINING MUNITIONS / BURY ST EDMUNDS, UNITED KINGDOM Option / FFP PICATINNY ARSENAL, NJ Jul 2027 Sep 2028 5,781,318 0.83 Y LI 0132E00700 - CTG, 5.56MM, All Types Army Location of PCO Item Number / Title [DODIC]: E96110 / CTG, 5.56mm Marking, M1042 (Blue) [AC39] UNCLASSIFIED Page 48 of 56 P-1 Line #1 RFP Issue Date Volume 1 - 48 === page 81 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E96111 / CTG, 5.56mm Marking, M1042 (Red) [AC40] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 18.312 1.763 2.616 2.681 - 2.681 - - - - - - 18.312 1.763 2.616 2.681 - 2.681 - - - - - - 18.312 1.763 2.616 2.681 - 2.681 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Qty ($) FY 2025 Total Cost (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Complete Round (†) Subtotal: Recurring Cost Subtotal: Hardware Cost 0.72 17.442 0.76 1.729 0.81 2.444 0.83 2.503 - - - 0.83 - 24,367,505 - 17.447 - 2,277,853 - 1.729 - 3,016,878 - 2.444 - 3,016,091 - 2.515 - - - - 3,016,091 - 2.503 2.515 - - 17.447 - - 1.729 - - 2.444 - - 2.515 - - - - - 2.515 Support - Production Engineering Cost Production Engineering - - 0.824 - - 0.034 - - 0.172 - - 0.166 - - - - - 0.166 Subtotal: Support Production Engineering Cost - - 0.824 - - 0.034 - - 0.172 - - 0.166 - - - - - 0.166 Gross/Weapon System Cost - - 18.312 - - 1.763 - - 2.616 - - 2.681 - - - - - 2.681 Remarks: FY 2026 and FY 2027 funding increase due to additional procurement of ammunition to meet training requirements. (†) indicates the presence of a P-5a LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 49 of 56 P-1 Line #1 Volume 1 - 49 === page 82 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements Complete Round Complete Round Complete Round O O C P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 ULTIMATE TRAINING MUNITIONS / BURY ST EDMUNDS, UNITED KINGDOM Option / FFP PICATINNY ARSENAL, NJ Jun 2025 Aug 2026 2,277,853 0.76 Y 2026 ULTIMATE TRAINING MUNITIONS / BURY ST EDMUNDS, UNITED KINGDOM Option / FFP PICATINNY ARSENAL, NJ Jul 2026 Sep 2027 3,016,878 0.81 Y 2027 ULTIMATE TRAINING MUNITIONS / BURY ST EDMUNDS, UNITED KINGDOM Option / FFP PICATINNY ARSENAL, NJ Jul 2027 Sep 2028 3,016,091 0.83 Y LI 0132E00700 - CTG, 5.56MM, All Types Army Location of PCO Item Number / Title [DODIC]: E96111 / CTG, 5.56mm Marking, M1042 (Red) [AC40] UNCLASSIFIED Page 50 of 56 P-1 Line #1 RFP Issue Date Volume 1 - 50 === page 83 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E96120 / CTG, 5.56mm Marking, M1071 (Blue) Linked f/SAW [AC42] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 7.586 0.906 1.720 1.766 - 1.766 - - - - - - 7.586 0.906 1.720 1.766 - 1.766 - - - - - - 7.586 0.906 1.720 1.766 - 1.766 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Qty ($) FY 2025 Total Cost (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Complete Round (†) Subtotal: Recurring Cost Subtotal: Hardware Cost 0.84 5.985 1.05 0.901 1.13 1.627 1.15 1.665 - - - 1.15 - 7,108,106 - 5.985 - 859,036 - 0.901 - 1,439,487 - 1.627 - 1,449,815 - 1.667 - - - - 1,449,815 - 1.665 1.667 - - 5.985 - - 0.901 - - 1.627 - - 1.667 - - - - - 1.667 Support - Production Engineering Cost Production Engineering - - 1.591 - - 0.005 - - 0.093 - - 0.101 - - - - - 0.101 Subtotal: Support Production Engineering Cost - - 1.591 - - 0.005 - - 0.093 - - 0.101 - - - - - 0.101 Gross/Weapon System Cost - - 7.586 - - 0.906 - - 1.720 - - 1.766 - - - - - 1.766 Remarks: FY 2026 and FY 2027 funding increase due to additional procurement of ammunition to meet training requirements. (†) indicates the presence of a P-5a LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 51 of 56 P-1 Line #1 Volume 1 - 51 === page 84 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements Complete Round Complete Round Complete Round O O C P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 ULTIMATE TRAINING MUNITIONS / BURY ST EDMUNDS, UNITED KINGDOM Option / FFP PICATINNY ARSENAL, NJ Jun 2025 Aug 2026 859,036 1.05 Y 2026 ULTIMATE TRAINING MUNITIONS / BURY ST EDMUNDS, UNITED KINGDOM Option / FFP PICATINNY ARSENAL, NJ Jul 2026 Apr 2027 1,439,487 1.13 Y 2027 ULTIMATE TRAINING MUNITIONS / BURY ST EDMUNDS, UNITED KINGDOM Option / FFP PICATINNY ARSENAL, NJ Jul 2027 Apr 2028 1,449,815 1.15 Y LI 0132E00700 - CTG, 5.56MM, All Types Army Location of PCO Item Number / Title [DODIC]: E96120 / CTG, 5.56mm Marking, M1071 (Blue) Linked f/SAW [AC42] UNCLASSIFIED Page 52 of 56 P-1 Line #1 RFP Issue Date Volume 1 - 52 === page 85 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E96121 / CTG, 5.56mm Marking, M1071 (Red) Linked f/SAW [AC43] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 6.054 0.694 1.214 1.245 - 1.245 - - - - - - 6.054 0.694 1.214 1.245 - 1.245 - - - - - - 6.054 0.694 1.214 1.245 - 1.245 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Qty ($) FY 2025 Total Cost (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Complete Round (†) Subtotal: Recurring Cost Subtotal: Hardware Cost 0.82 5.408 1.05 0.691 1.12 1.143 1.15 1.174 - - - 1.15 - 6,599,730 - 5.405 - 658,578 - 0.691 - 1,020,481 - 1.143 - 1,022,090 - 1.175 - - - - 1,022,090 - 1.174 1.175 - - 5.405 - - 0.691 - - 1.143 - - 1.175 - - - - - 1.175 Support - Production Engineering Cost Production Engineering - - 0.647 - - 0.003 - - 0.071 - - 0.071 - - - - - 0.071 Subtotal: Support Production Engineering Cost - - 0.647 - - 0.003 - - 0.071 - - 0.071 - - - - - 0.071 Gross/Weapon System Cost - - 6.054 - - 0.694 - - 1.214 - - 1.245 - - - - - 1.245 Remarks: FY 2026 and FY 2027 funding increase due to additional procurement of ammunition to meet training requirements. (†) indicates the presence of a P-5a LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 53 of 56 P-1 Line #1 Volume 1 - 53 === page 86 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements Complete Round Complete Round Complete Round O O C P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 ULTIMATE TRAINING MUNITIONS / BURY ST EDMUNDS, UNITED KINGDOM Option / FFP PICATINNY ARSENAL, NJ Jun 2025 Apr 2026 658,578 1.05 Y 2026 ULTIMATE TRAINING MUNITIONS / BURY ST EDMUNDS, UNITED KINGDOM Option / FFP PICATINNY ARSENAL, NJ Jun 2026 Jul 2027 1,020,481 1.12 Y 2027 ULTIMATE TRAINING MUNITIONS / BURY ST EDMUNDS, UNITED KINGDOM Option / FFP PICATINNY ARSENAL, NJ Jun 2027 Jul 2028 1,022,090 1.15 Y LI 0132E00700 - CTG, 5.56MM, All Types Army Location of PCO Item Number / Title [DODIC]: E96121 / CTG, 5.56mm Marking, M1071 (Red) Linked f/SAW [AC43] UNCLASSIFIED Page 54 of 56 P-1 Line #1 RFP Issue Date Volume 1 - 54 === page 87 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E96125 / Ctg, 5.56mm, Short Range Training, M1037, sngl rd [AB67] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 16.999 1.618 0.780 0.800 - 0.800 - - - - - - 16.999 1.618 0.780 0.800 - 0.800 - - - - - - 16.999 1.618 0.780 0.800 - 0.800 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Qty ($) FY 2025 Total Cost (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 1.08 Subtotal: Recurring Cost - ROUND Subtotal: Hardware Cost 14,701,423 15.857 1.70 - 15.863 - - 15.863 - - - 0.075 - - 849,600 1.444 1.75 - 1.444 - - 1.444 - - - - 0.075 - - 422,974 0.740 1.91 - 0.740 - - 0.740 - - - - - - - 396,685 0.758 - - - 1.91 396,685 0.758 - 0.758 - - - - - 0.758 - 0.758 - - - - - 0.758 - - - - - - - - - - - - - - - - - - - Support - Product Improvement Cost Safety Subtotal: Support - Product Improvement Cost Support - Production Engineering Cost Production Engineering - - 1.061 - - 0.174 - - 0.040 - - 0.042 - - - - - 0.042 Subtotal: Support Production Engineering Cost - - 1.061 - - 0.174 - - 0.040 - - 0.042 - - - - - 0.042 Gross/Weapon System Cost - - 16.999 - - 1.618 - - 0.780 - - 0.800 - - - - - 0.800 Remarks: FY 2025 to FY 2027 unit prices are based on step ladder pricing matrix with quantity ranges. Lower FY 2026 and FY 2027 planned quantity results in higher unit prices for FY 2026 and FY 2027. (†) indicates the presence of a P-5a LI 0132E00700 - CTG, 5.56MM, All Types Army UNCLASSIFIED Page 55 of 56 P-1 Line #1 Volume 1 - 55 === page 88 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements COMPLETE ROUND COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 0132E00700 / CTG, 5.56MM, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 CANADIAN COMMERCIAL CORP / OTTAWA, CANADA C / FFP PICATINNY ARSENAL, NJ Jun 2025 Jul 2026 849,600 1.70 Y 2026 CANADIAN COMMERCIAL CORP / OTTAWA, CANADA Option / FFP PICATINNY ARSENAL, NJ May 2026 Jul 2027 422,974 1.75 Y 2027 CANADIAN COMMERCIAL CORP / OTTAWA, CANADA Option / FFP PICATINNY ARSENAL, NJ Jun 2027 Aug 2028 396,685 1.91 Y LI 0132E00700 - CTG, 5.56MM, All Types Army Location of PCO Item Number / Title [DODIC]: E96125 / Ctg, 5.56mm, Short Range Training, M1037, sngl rd [AB67] UNCLASSIFIED Page 56 of 56 P-1 Line #1 RFP Issue Date Volume 1 - 56 === page 89 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition P-1 Line Item Number / Title: 0612E02000 / CTG, 7.62MM, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 2,173.794 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 2,173.794 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 2,173.794 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 41.519 51.757 41.356 - 41.356 66.528 60.257 70.841 71.569 - - - - - - - - - - - 41.519 51.757 41.356 - 41.356 66.528 60.257 70.841 71.569 - - - - - - - - - - - 41.519 51.757 41.356 - 41.356 66.528 60.257 70.841 71.569 - Total 2,577.621 2,577.621 2,577.621 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The FY 2026 spend plan amount for CTG, 7.62mm All Types includes $51,757 of discretionary and $38,000 thousand of mandatory (reconciliation) for a total of $89,757 thousand. This budget line includes 7.62mm ALL TYPES. (E01902) 7.62mm Blank, M82 w/M13 Link is linked in 100-round belts for training use in the M240 family of machine weapons. The M82 is a blank cartridge (no projectile) designed to mimic the sound and function of combat ammunition with the use of a blank-firing adaptor. It can be identified by its long neck and rosette-crimped mouth. It is intended for training use only and is not suitable for combat. This item is Code A, approved for service use. (E02007) 7.62mm 4 BALL/1 TRACER F/OHF consists of an M80 Overhead Fire (OHF) ball and an M62 OHF tracer cartridge linked four to one and is used for overhead fire in the M240 Machine Gun family of weapons. Manufactured with unique bullet jackets and no base closure seals to reduce fragmentation or shrapnel risks to soldiers training underneath the flight path of these bullets. This item is Code A, approved for service use. (E02011) 7.62mm M80A1 Enhanced Performance Round (EPR) Ball is linked in a 100-cartridge belt with the M13 link for use in the M240 Machine Gun family of weapons. The M80A1 Ball Cartridge has a steel penetrator and non-lead slug surrounded by a copper jacket. They are intended for use against personnel and light-armored targets. This Item is Code A, approved for service use. (E02012) 7.62mm M80A1 Enhanced Performance Round (EPR) Ball Cartridges and M62A1 Tracer Cartridges are linked in a 100-cartridge belt in a 4 Ball/1 Tracer configuration with the M13 link for use in the M240 Machine Gun family of weapons. The M80A1 Ball Cartridge has a steel penetrator and a non-lead slug surrounded by a copper jacket. The M62A1 Tracer Cartridge also contains a lead-free projectile and provides a visible red-light signature through its trajectory and is a ballistic match with the M80A1 trajectory. The M1161 Enhanced Performance Round is being phased in to replace M62A1 - Tracer Cartridge contains 2-piece projectile consisting of a steel penetrator and a non-lead jacket and provides a visible light signature through its trajectory with a limited view during its early trajectory. The M1161 Enhanced Performance Round - Tracer Cartridge provide visible signature of fire out to 800 meters and a limited view visible signature to the shooter only for 300m. They are intended for use against personnel and lightarmored targets. This Item is Code A, approved for service use. (E89100) 7.62mm M118 Long Range cartridge is a match grade design intended for long-range accuracy and is packed in a 20-cartridge cardboard carton and intended for Sniper use in the M40, M110, M110A1, and MK21 Rifles. It is intended for use against personnel and non-armored targets. This Item is Code A, approved for service use. LI 0612E02000 - CTG, 7.62MM, All Types Army UNCLASSIFIED Page 1 of 23 P-1 Line #2 Volume 1 - 57 === page 90 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 0612E02000 / CTG, 7.62MM, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A (F57510) 7.62mm M1158 Advanced Armor-Piercing (ADVAP) Ball Cartridges and M62A1 Tracer Cartridges are linked in a 100-cartridge belt in a 4 Ball/1 Tracer configuration with the M13 link for use in the M240 Machine Gun family of weapons. The M1158 Ball Cartridge uses projectiles with an exposed black metal tip surrounded by a copper jacket. The M62A1 Tracer Cartridge also contains a lead-free projectile and provides a visible red-light signature through its trajectory and is a ballistic match with the M1158 trajectory. This item is intended for use against a broad spectrum of hard targets. This Item is Code A, approved for service use. (F57515) 7.62mm Reduced Range Cartridges, XM1164 Ball/XM1165 Tracer, are issued in a 100-cartridge belt with the M13 link for use in the M240 machine gun family. These cartridges are conventional smallcaliber munitions with a modified projectile designed for live fire training on ranges with reduced Surface Danger Zones (SDZ). They are intended for training use only and are not suitable for combat. These items are Code A, approved for service use. LI 0612E02000 - CTG, 7.62MM, All Types Army UNCLASSIFIED Page 2 of 23 P-1 Line #2 Volume 1 - 58 === page 91 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition P-1 Line Item Number / Title: 0612E02000 / CTG, 7.62MM, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 E01902 / CTG, 7.62mm Blank, M82 w/M13 Link [A111] P-5a A - / 398.433 P-5 E02007 / CTG 7.62MM 4 BALL/1 TRACER F/OHF [A151] P-5a A - / 754.310 P-5 E02011 / CTG, 7.62mm Ball M80A1 LeadFree, w/M13 Link [AB79] P-5a A - / 108.255 P-5 E02012 / CTG, 7.62mm 4 Ball M80A1/1 Trcr M62A1 LeadFree [AB86] P-5a, P-21 A - P-5 E89100 / CTG, 7.62mm Special Ball, M118 Long Range [AA11] P-5a A P-5 F57510 / CTG, 7.62MM ADVANCED ARMOR PIERCING, M1158 A P-5 F57515 / CTG, 7.62 REDUCED RANGE AMMUNITION P-40 Total Gross/Weapon System Cost P-5a B / 7.052 - / 6.936 - / 6.065 - / - - / 6.065 / - - / 0.346 - / 0.340 - / - - / 0.340 - / 9.884 - / 2.040 - / 2.094 - / - - / 2.094 / 568.102 - / 15.822 - / 32.334 - / 31.977 - / - - / 31.977 - / 51.586 - / 0.601 - / 0.728 - / 0.758 - / - - - / 291.932 - / 0.401 / - - / - / 1.176 - / 7.759 - / 9.373 - / 0.122 - / - - / 0.122 / 2,173.794 - / 41.519 - / 51.757 - / 41.356 - / - - / 41.356 - - - / - - / 0.758 - / - *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 base budget supports critical Army Title 10 war reserve/operational, training, and test requirements in accordance with DoDI 3000.04 (Munitions Requirements Process) and AR 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War (OSW)-approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life-cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. FY 2027 Base Budget supports the Minimum Sustaining Rates at both Lake City Army Ammunition Plant (LCAAP) as well as the Second Source facility. FY 2027 Total Base dollars in the amount of $41.356 million supports the procurement of 40.714 million cartridges. The Army intends to convert any price advantage created through contract negotiations, other service procurement, and/or Foreign Military Sales (FMS) to increase procurement of 7.62MM ALL TYPES when possible. (E01902) 7.62mm Blank, M82 w/M13 Link is a training unique item not used in combat. The FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. The FY 2027 Base procurement dollars in the amount of $6.065 million supports the procurement of 8.510 million Blank M82 cartridges. Type classification date: 1960 (E02007) 7.62mm 4 BALL/1 TRACER F/OHF is a training unique item and is not used in combat. The FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. The FY 2027 Base procurement dollars in the amount of $0.340 million supports the procurement of 0.321 million rounds. TYPE CLASSIFICATION DATE: 1975 (E02011) 7.62mm M80A1 Enhanced Performance Round (EPR) Lead Free Slug (LFS) Ball Cartridge is a training standard item used in training and combat. The FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. The FY 2027 Base procurement dollars in the amount of $2.094 million supports the procurement of 1.886 million 7.62mm M80A1 1 Ball (EPR) (LFS) Cartridges. LI 0612E02000 - CTG, 7.62MM, All Types Army UNCLASSIFIED Page 3 of 23 P-1 Line #2 Volume 1 - 59 === page 92 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 0612E02000 / CTG, 7.62MM, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Type classification date: 1962 (E02012) 7.62mm M80A1 Enhanced Performance Round (EPR) 4 Ball /1 Trace, Lead Free Slug (LFS) Cartridge /M62A1 LFS Tracer Cartridge; M1161 Enhanced Performance Round - Tracer Cartridge are training standard items used in training and combat. The FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. The FY 2027 Base procurement dollars in the amount of $31.977 million supports the procurement of 29.270 million 7.62mm M80A1 4 Ball/1Trace (EPR) Cartridges. Type classification date: 1962 (E89100) 7.62mm M118 Long Range Round is a training standard item used in training and combat. The FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. The FY 2027 Base procurement dollars in the amount of $0.758 million supports the procurement of 0.685 million 7.62mm M118 Long Range Cartridges. Type classification date: Prior to 1997 (F57510) 7.62mm M1158 Advanced Armor-Piercing (ADVAP) Ball Cartridges and M62A1 Tracer Cartridges are linked in a 100-cartridge belt in a 4 Ball/1 Tracer configuration with the M13 link. This is a war reserve item used in combat. There is no FY 2027 request for this item. Type classification date: 2020 (F57515) 7.62mm Reduced Range Cartridges - These are training unique items not used in combat. The FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. The FY 2027 Base procurement dollars in the amount of $0.122 million supports the procurement of 0.042 million 7.62mm Reduced Range Cartridges. Type classification date: 2025 LI 0612E02000 - CTG, 7.62MM, All Types Army UNCLASSIFIED Page 4 of 23 P-1 Line #2 Volume 1 - 60 === page 93 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0612E02000 / CTG, 7.62MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E01902 / CTG, 7.62mm Blank, M82 w/ M13 Link [A111] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 7.052 6.936 6.065 - 6.065 - Gross/Weapon System Cost ($ in Millions) 398.433 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 398.433 Plus CY Advance Procurement ($ in Millions) - - - - - 7.052 6.936 6.065 - 6.065 - Total Obligation Authority ($ in Millions) 398.433 FY 2027 Total - - - - - 7.052 6.936 6.065 - 6.065 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Qty Total Cost 970,310K 391.035 0.56 (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 0.40 Subtotal: Recurring Cost - - 391.035 - - - 391.035 - Environmental Initiatives - - 0.444 Subtotal: Support - Product Improvement Cost - - Production Engineering - Subtotal: Support Production Engineering Cost - ROUND Subtotal: Hardware Cost 10,129,827 5.673 0.57 - 5.673 - - 5.673 - - - - 0.444 - - - 6.894 - - 6.894 - 10,101,797 5.758 0.58 - 5.758 - - 5.758 - - - - - - - - 1.374 - - 1.374 - 8,510,236 4.936 - - - 0.58 8,510,236 4.936 - 4.936 - - - - - 4.936 - 4.936 - - - - - 4.936 - - - - - - - - - - - - - - - - - - - - 1.161 - - 1.125 - - - - - 1.125 - 1.161 - - 1.125 - - - - - 1.125 Support - Product Improvement Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.060 - - 0.005 - - 0.005 - - 0.004 - - - - - 0.004 Subtotal: Support - Quality Assurance Cost - - 0.060 - - 0.005 - - 0.005 - - 0.004 - - - - - 0.004 Gross/Weapon System Cost - - 398.433 - - 7.052 - - 6.936 - - 6.065 - - - - - 6.065 (†) indicates the presence of a P-5a LI 0612E02000 - CTG, 7.62MM, All Types Army UNCLASSIFIED Page 5 of 23 P-1 Line #2 Volume 1 - 61 === page 94 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements COMPLETE ROUND COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 0612E02000 / CTG, 7.62MM, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Sep 2025 Sep 2026 10,129,827 0.56 Y 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 10,101,797 0.57 Y 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 8,510,236 0.58 Y LI 0612E02000 - CTG, 7.62MM, All Types Army Location of PCO Item Number / Title [DODIC]: E01902 / CTG, 7.62mm Blank, M82 w/ M13 Link [A111] UNCLASSIFIED Page 6 of 23 P-1 Line #2 RFP Issue Date Volume 1 - 62 === page 95 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0612E02000 / CTG, 7.62MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E02007 / CTG 7.62MM 4 BALL/1 TRACER F/OHF [A151] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) 754.310 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 754.310 Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) 754.310 FY 2027 Base FY 2027 OOC - - - - FY 2027 Total - - 0.346 0.340 - 0.340 - - - - - - 0.346 0.340 - 0.340 - - - - - - 0.346 0.340 - 0.340 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Qty ($) FY 2025 Total Cost (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 0.55 Subtotal: Recurring Cost - Production Engineering Subtotal: Support Production Engineering Cost ROUND Subtotal: Hardware Cost 1,367,721K 753.615 - - - 0.90 - 753.615 - - - - - 753.615 - - - - - - 0.690 - - - - - 0.690 - - 333,035 0.300 0.92 - 0.300 - - 0.300 - - - 0.044 - - - 321,187 0.295 - - - 0.92 321,187 0.295 - 0.295 - - - - - 0.295 - 0.295 - - - - - 0.295 - - 0.045 - - - - - 0.045 0.044 - - 0.045 - - - - - 0.045 Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.005 - - - - - 0.000 - - 0.000 - - - - - 0.000 Subtotal: Support - Quality Assurance Cost - - 0.005 - - - - - 0.000 - - 0.000 - - - - - 0.000 Gross/Weapon System Cost - - 754.310 - - - - - 0.346 - - 0.340 - - - - - 0.340 Remarks: FY 2026 and FY 2027 unit costs represent average price ranges. FY 2026 and FY 2027 includes full Economic Price Adjustments due to increases in commodity prices. (†) indicates the presence of a P-5a LI 0612E02000 - CTG, 7.62MM, All Types Army UNCLASSIFIED Page 7 of 23 P-1 Line #2 Volume 1 - 63 === page 96 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 0612E02000 / CTG, 7.62MM, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 333,035 0.90 Y 2027 TO BE SELECTED / TBS01 C / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 321,187 0.92 Y LI 0612E02000 - CTG, 7.62MM, All Types Army Location of PCO Item Number / Title [DODIC]: E02007 / CTG 7.62MM 4 BALL/1 TRACER F/OHF [A151] UNCLASSIFIED Page 8 of 23 P-1 Line #2 RFP Issue Date Volume 1 - 64 === page 97 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0612E02000 / CTG, 7.62MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E02011 / CTG, 7.62mm Ball M80A1 LeadFree, w/M13 Link [AB79] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 9.884 2.040 2.094 - 2.094 - Gross/Weapon System Cost ($ in Millions) 108.255 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 108.255 Plus CY Advance Procurement ($ in Millions) - - - - - 9.884 2.040 2.094 - 2.094 - Total Obligation Authority ($ in Millions) 108.255 FY 2027 Total - - - - - 9.884 2.040 2.094 - 2.094 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Qty Total Cost 125,744K 101.601 0.98 (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 0.81 Subtotal: Recurring Cost - - 101.601 - - - 101.601 - Acceptance Test - - 0.115 Subtotal: Support Acceptance Testing Cost - - Production Engineering - Subtotal: Support Production Engineering Cost - ROUND Subtotal: Hardware Cost 9,790,749 9.595 0.96 - 9.595 - - 9.595 - - - - 0.115 - - - 6.441 - - 6.441 - 1,852,999 1.779 0.96 - 1.779 - - 1.779 - - - - - - - - 0.279 - - 0.279 - 1,885,631 1.810 - - - 0.96 1,885,631 1.810 - 1.810 - - - - - 1.810 - 1.810 - - - - - 1.810 - - - - - - - - - - - - - - - - - - - - 0.248 - - 0.274 - - - - - 0.274 - 0.248 - - 0.274 - - - - - 0.274 Support - Acceptance Testing Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.068 - - 0.010 - - 0.010 - - 0.010 - - - - - 0.010 Subtotal: Support - Quality Assurance Cost - - 0.068 - - 0.010 - - 0.010 - - 0.010 - - - - - 0.010 Gross/Weapon System Cost - - 108.255 - - 9.884 - - 2.040 - - 2.094 - - - - - 2.094 (†) indicates the presence of a P-5a LI 0612E02000 - CTG, 7.62MM, All Types Army UNCLASSIFIED Page 9 of 23 P-1 Line #2 Volume 1 - 65 === page 98 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements COMPLETE ROUND COMPLETE ROUND COMPLETE ROUND COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 0612E02000 / CTG, 7.62MM, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E02011 / CTG, 7.62mm Ball M80A1 LeadFree, w/M13 Link [AB79] Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 OLIN CORPORATION WINCHESTER / OXFORD, MS Option / FFP ROCK ISLAND ARSENAL, IL Sep 2025 Sep 2026 9,790,749 0.98 Y 2026 OLIN CORPORATION WINCHESTER / OXFORD, MS Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 463,250 0.96 Y 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 1,389,749 0.96 Y 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 1,414,223 0.96 Y 2027 TO BE SELECTED / TO BE SELECTED Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 471,408 0.96 Y RFP Issue Date Remarks: Complete round is an average unit cost between two contractors. The quantity split will be determined between the two contractors in the year of execution. LI 0612E02000 - CTG, 7.62MM, All Types Army UNCLASSIFIED Page 10 of 23 P-1 Line #2 Volume 1 - 66 === page 99 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0612E02000 / CTG, 7.62MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E02012 / CTG, 7.62mm 4 Ball M80A1/1 Trcr M62A1 LeadFree [AB86] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 15.822 32.334 31.977 - 31.977 - Gross/Weapon System Cost ($ in Millions) 568.102 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 568.102 Plus CY Advance Procurement ($ in Millions) - - - - - 15.822 32.334 31.977 - 31.977 - Total Obligation Authority ($ in Millions) 568.102 FY 2027 Total - - - - - 15.822 32.334 31.977 - 31.977 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Qty Total Cost 532,762K 524.238 0.89 (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 0.98 11.191 1.04 Subtotal: Recurring Cost - - 524.238 - - - 524.238 - - 11.191 - - 11.191 - Acceptance Test - - 3.900 Subtotal: Support Acceptance Testing Cost - - 0.428 - - 3.900 - - Environmental Initiatives - Subtotal: Support - Product Improvement Cost - - 2.050 - - 2.050 - Production Engineering Subtotal: Support Production Engineering Cost - - 37.135 - - 37.135 Quality Assurance - - Subtotal: Support - Quality Assurance Cost - - ROUND Subtotal: Hardware Cost 12,574,032 26,080,292 27.124 0.95 - 27.124 - - 27.124 - - - - 0.428 - - - 0.755 - - 0.755 - - - 3.419 - - 3.419 0.144 - - 0.144 - - 29,269,935 27.806 - - - 0.95 29,269,935 27.806 - 27.806 - - - - - 27.806 - 27.806 - - - - - 27.806 - - 0.115 - - - - - 0.115 - - - 0.115 - - - - - 0.115 - - - - - - - - - - - - - - - - - - - - - - - - 5.181 - - 4.036 - - - - - 4.036 - - 5.181 - - 4.036 - - - - - 4.036 0.029 - - 0.029 - - 0.020 - - - - - 0.020 0.029 - - 0.029 - - 0.020 - - - - - 0.020 Support - Acceptance Testing Cost Support - Product Improvement Cost Support - Production Engineering Cost Support - Quality Assurance Cost LI 0612E02000 - CTG, 7.62MM, All Types Army UNCLASSIFIED Page 11 of 23 P-1 Line #2 Volume 1 - 67 === page 100 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0612E02000 / CTG, 7.62MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E02012 / CTG, 7.62mm 4 Ball M80A1/1 Trcr M62A1 LeadFree [AB86] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Support - Staging and Transportation Cost Staging and Transportation Subtotal: Support - Staging and Transportation Cost - - 0.450 - - - - - - - - - - - - - - - - - 0.450 - - - - - - - - - - - - - - - Support - Study & Analysis Cost - - 0.185 - - - - - - - - - - - - - - - Subtotal: Support - Study & Analysis Cost Study & Analysis - - 0.185 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 568.102 - - 15.822 - - 32.334 - - 31.977 - - - - - 31.977 Remarks: FY 2025 Unit cost reflects achieving better price range based on the overall procurement quantity for the 7.62mm family of ammunition. FY2026 and FY2027 unit costs represent average price ranges. (†) indicates the presence of a P-5a LI 0612E02000 - CTG, 7.62MM, All Types Army UNCLASSIFIED Page 12 of 23 P-1 Line #2 Volume 1 - 68 === page 101 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 0612E02000 / CTG, 7.62MM, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E02012 / CTG, 7.62mm 4 Ball M80A1/1 Trcr M62A1 LeadFree [AB86] Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Sep 2025 Sep 2026 9,430,524 0.99 Y 2025 OLIN CORPORATION WINCHESTER / OXFORD, MS Option / FFP ROCK ISLAND ARSENAL, IL Sep 2025 Sep 2026 3,143,508 0.99 Y 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 19,560,219 1.04 Y 2026 OLIN CORPORATION WINCHESTER / OXFORD, MS Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 6,520,073 1.04 Y 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 21,952,451 0.95 Y 2027 TO BE SELECTED / TO BE SELECTED C / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 7,317,484 0.95 Y RFP Issue Date indicates the presence of a P-21 Remarks: Complete round is an average unit cost between two contractors. The quantity split will be determined between the two contractors in the year of execution. LI 0612E02000 - CTG, 7.62MM, All Types Army UNCLASSIFIED Page 13 of 23 P-1 Line #2 Volume 1 - 69 === page 102 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0612E02000 / CTG, 7.62MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E02012 / CTG, 7.62mm 4 Ball M80A1/1 Trcr M62A1 LeadFree [AB86] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R S E P B A L A N C E 8.645 Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G COMPLETE ROUND Prior Years Deliveries: 532761745 1 2025 ARMY 9.431 .000 9.431 A - - - - - - - - - - - - .786 2 2025 ARMY 3.144 .000 3.144 A - - - - - - - - - - - - .262 2.882 1 2026 ARMY 19.560 .000 19.560 A - - - - - - - 19.560 2 2026 ARMY 6.520 .000 A - - - - - - - 1 2027 ARMY 21.952 .000 21.952 3 2027 ARMY 7.317 .000 6.520 6.520 21.952 7.317 7.317 O C T LI 0612E02000 - CTG, 7.62MM, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #2 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 70 === page 103 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0612E02000 / CTG, 7.62MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E02012 / CTG, 7.62mm 4 Ball M80A1/1 Trcr M62A1 LeadFree [AB86] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND Prior Years Deliveries: 532761745 1 2025 ARMY 9.431 .786 8.645 .786 .786 .786 .786 .786 .786 .786 .786 .786 .786 .786 2 2025 ARMY 3.144 .262 2.882 .262 .262 .262 .262 .262 .262 .262 .262 .262 .262 .262 1 2026 ARMY 19.560 .000 19.560 - - - - - 1.630 1.630 1.630 1.630 1.630 1.630 1.630 1.630 1.630 1.630 1.630 1.630 2 2026 ARMY 6.520 .000 - - - - - .543 .543 .543 .543 .543 .543 .543 .543 .543 .543 .543 .543 1 2027 ARMY 21.952 .000 21.952 A - - - - - - - - - - - - 3 2027 ARMY 7.317 .000 6.520 7.317 A O C T LI 0612E02000 - CTG, 7.62MM, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L .000 .000 A U G UNCLASSIFIED Page 15 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #2 .000 .000 1.829 1.829 1.829 1.829 1.829 1.829 1.829 9.147 3.049 .610 .610 .610 .610 .610 .610 .610 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 71 === page 104 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0612E02000 / CTG, 7.62MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E02012 / CTG, 7.62mm 4 Ball M80A1/1 Trcr M62A1 LeadFree [AB86] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND Prior Years Deliveries: 532761745 1 2025 ARMY 9.431 9.431 .000 .000 2 2025 ARMY 3.144 3.144 .000 .000 1 2026 ARMY 19.560 19.560 .000 .000 2 2026 ARMY 6.520 6.520 .000 1 2027 ARMY 21.952 12.806 9.147 1.829 1.829 1.829 1.829 1.829 3 2027 ARMY 7.317 4.269 3.049 .610 .610 .610 .610 .610 O C T N O V D E C J A N F E B .000 LI 0612E02000 - CTG, 7.62MM, All Types Army .000 .000 M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 23 S E P O C T N O V D E C J A N F E B P-1 Line #2 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 72 === page 105 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0612E02000 / CTG, 7.62MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E02012 / CTG, 7.62mm 4 Ball M80A1/1 Trcr M62A1 LeadFree [AB86] Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 OLIN WINCHESTER, LLC LCAAP - INDEPENDENCE, MO 3,750,000 4,687,500 5,625,000 6 6 12 18 6 6 12 18 2 OLIN CORPORATION WINCHESTER - OXFORD, MS 1,000,000 2,000,000 3,875,000 6 6 12 18 6 6 12 18 3 TO BE SELECTED - TO BE SELECTED 1,000,000 2,000,000 3,875,000 6 6 12 18 6 6 12 18 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0612E02000 - CTG, 7.62MM, All Types Army UNCLASSIFIED Page 17 of 23 P-1 Line #2 Volume 1 - 73 === page 106 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0612E02000 / CTG, 7.62MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E89100 / CTG, 7.62mm Special Ball, M118 Long Range [AA11] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 51.586 0.601 0.728 0.758 - 0.758 - - - - - - 51.586 0.601 0.728 0.758 - 0.758 - - - - - - 51.586 0.601 0.728 0.758 - 0.758 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Qty ($) FY 2025 Total Cost (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 0.97 Subtotal: Recurring Cost - Production Engineering Subtotal: Support Production Engineering Cost ROUND Subtotal: Hardware Cost 48,654,328 46.951 0.88 - 46.951 - - 46.951 - - - 4.598 - - 623,209 0.548 1.05 - 0.548 - - 0.548 - - - 0.050 4.598 - - 608,583 0.639 0.96 - 0.639 - - 0.639 - - - 0.084 0.050 - - 685,078 0.658 - - - 0.96 685,078 0.658 - 0.658 - - - - - 0.658 - 0.658 - - - - - 0.658 - - 0.093 - - - - - 0.093 0.084 - - 0.093 - - - - - 0.093 Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.037 - - 0.003 - - 0.005 - - 0.007 - - - - - 0.007 Subtotal: Support - Quality Assurance Cost - - 0.037 - - 0.003 - - 0.005 - - 0.007 - - - - - 0.007 Gross/Weapon System Cost - - 51.586 - - 0.601 - - 0.728 - - 0.758 - - - - - 0.758 Remarks: FY 2026 and FY 2027 include full Economic Price Adjustments due to increases in commodity prices. (†) indicates the presence of a P-5a LI 0612E02000 - CTG, 7.62MM, All Types Army UNCLASSIFIED Page 18 of 23 P-1 Line #2 Volume 1 - 74 === page 107 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements COMPLETE ROUND COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 0612E02000 / CTG, 7.62MM, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Sep 2025 Sep 2026 623,209 0.88 Y 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 608,583 1.05 Y 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 685,078 0.96 Y LI 0612E02000 - CTG, 7.62MM, All Types Army Location of PCO Item Number / Title [DODIC]: E89100 / CTG, 7.62mm Special Ball, M118 Long Range [AA11] UNCLASSIFIED Page 19 of 23 P-1 Line #2 RFP Issue Date Volume 1 - 75 === page 108 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0612E02000 / CTG, 7.62MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: F57510 / CTG, 7.62MM ADVANCED ARMOR PIERCING, M1158 MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC FY 2027 Total - FY 2026 - - - - 0.401 - - - - - - - - - 0.401 - - - - - - - - - 0.401 - - - - - Gross/Weapon System Cost ($ in Millions) 291.932 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 291.932 Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) 291.932 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Qty ($) FY 2025 Total Cost (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE ROUND 12.66 216.237 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 216.237 - - - - - - - - - - - - - - - - - 216.237 - - - - - - - - - - - - - - - Demilitarization - - 0.325 - - - - - - - - - - - - - - - Subtotal: Support Demilitarization Cost - - 0.325 - - - - - - - - - - - - - - - - - 3.059 - - - - - - - - - - - - - - - - - 3.059 - - - - - - - - - - - - - - - Value Engineering - - 0.292 - - 0.401 - - - - - - - - - - - - Subtotal: Support - NonRecurring Support Cost - - 0.292 - - 0.401 - - - - - - - - - - - - Production Verification Test - - 0.194 - - - - - - - - - - - - - - - Reliability - - 7.774 - - - - - - - - - - - - - - - Subtotal: Hardware Cost 17,076,304 Support - Demilitarization Cost Support - Engineering Change Proposals Cost Engineering Change Proposals Subtotal: Support Engineering Change Proposals Cost Support - Non-Recurring Support Cost Support - Product Improvement Cost LI 0612E02000 - CTG, 7.62MM, All Types Army UNCLASSIFIED Page 20 of 23 P-1 Line #2 Volume 1 - 76 === page 109 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0612E02000 / CTG, 7.62MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: F57510 / CTG, 7.62MM ADVANCED ARMOR PIERCING, M1158 MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) Subtotal: Support - Product Improvement Cost FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 7.968 - - - - - - - - - - - - - - - Production Engineering - - 6.460 - - - - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - 6.460 - - - - - - - - - - - - - - - Quality Assurance - - 0.042 - - - - - - - - - - - - - - - Subtotal: Support - Quality Assurance Cost - - 0.042 - - - - - - - - - - - - - - - - - 0.114 - - - - - - - - - - - - - - - - - 0.114 - - - - - - - - - - - - - - - Support - Production Engineering Cost Support - Quality Assurance Cost Support - Study & Analysis Cost Study & Analysis Subtotal: Support - Study & Analysis Cost Support - Undistributed Procurement Cost Undistributed Procurement - - 57.435 - - - - - - - - - - - - - - - Subtotal: Support Undistributed Procurement Cost - - 57.435 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 291.932 - - 0.401 - - - - - - - - - - - - LI 0612E02000 - CTG, 7.62MM, All Types Army UNCLASSIFIED Page 21 of 23 P-1 Line #2 Volume 1 - 77 === page 110 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0612E02000 / CTG, 7.62MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: F57515 / CTG, 7.62 REDUCED RANGE AMMUNITION MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 1.176 7.759 9.373 0.122 - 0.122 - - - - - - 1.176 7.759 9.373 0.122 - 0.122 - - - - - - 1.176 7.759 9.373 0.122 - 0.122 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 2.41 Subtotal: Recurring Cost - Acceptance Test Subtotal: Support Acceptance Testing Cost ROUND Subtotal: Hardware Cost 480,546 1.158 2.41 - 1.158 - - 1.158 - - - - - - 2,810,505 6.773 2.42 - 6.773 - - 6.773 - - - 0.164 - - - 3,481,527 8.425 2.67 42,219 0.113 - - - 2.67 42,219 0.113 - 8.425 - - 0.113 - - - - - 0.113 - 8.425 - - 0.113 - - - - - 0.113 - - - - - - - - - - - - 0.164 - - - - - - - - - - - - Support - Acceptance Testing Cost Support - Production Engineering Cost Production Engineering - - 0.018 - - 0.822 - - 0.948 - - 0.009 - - - - - 0.009 Subtotal: Support Production Engineering Cost - - 0.018 - - 0.822 - - 0.948 - - 0.009 - - - - - 0.009 Gross/Weapon System Cost - - 1.176 - - 7.759 - - 9.373 - - 0.122 - - - - - 0.122 Remarks: Price differences FY 2026 through FY 2027 are due to step ladder pricing matrices based on quantity ranges, as well as negotiated Economic Price Adjustments (EPA). Lower demand in FY 2027 results in a lower quantity for an estimated higher price range on the step ladder pricing matrix. (†) indicates the presence of a P-5a LI 0612E02000 - CTG, 7.62MM, All Types Army UNCLASSIFIED Page 22 of 23 P-1 Line #2 Volume 1 - 78 === page 111 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements COMPLETE ROUND COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 0612E02000 / CTG, 7.62MM, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 NAMMO DEFENSE SYSTEMS / SWEDEN SS / FFP ROCK ISLAND ARSENAL, IL Aug 2025 Aug 2026 2,810,505 2.41 Y 2026 NAMMO DEFENSE SYSTEMS / SWEDEN Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 3,481,527 2.42 Y 2027 NAMMO SWEDEN AKTIEBOLAG / KARLSBORG, SWEDEN Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 42,219 2.67 Y LI 0612E02000 - CTG, 7.62MM, All Types Army Location of PCO Item Number / Title [DODIC]: F57515 / CTG, 7.62 REDUCED RANGE AMMUNITION UNCLASSIFIED Page 23 of 23 P-1 Line #2 RFP Issue Date Volume 1 - 79 === page 112 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 425.013 425.013 425.013 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 233.440 233.440 233.440 426.177 426.177 426.177 536.695 - - 536.695 - - 536.695 - 536.695 536.695 536.695 686.973 686.973 686.973 699.041 699.041 699.041 698.695 698.695 698.695 To FY 2031 Complete 705.657 Continuing 705.657 705.657 Total - Continuing Continuing Continuing - - Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line includes NEXT GENERATION SQUAD WEAPON AMMUNITION (E06002) CTG 6.8MM GENERAL PURPOSE ROUND (M1186) is a 6.8mm Ball Cartridge, General Purpose (GP) ammunition packed in cartons for use in the Next Generation Squad Weapons (NGSW) M7 Rifle/XM8 Carbine. The GP Ball Cartridge has a steel penetrator and non-lead slug surrounded by a copper jacket. This ammunition is intended for use against personnel and light-armored targets. The GP ammunition is a training standard item used in both combat and training. This item is Code B, not approved for service use. (E06012) CTG 6.8MM SPECIAL PURPOSE 4SP/1TRCR LINKED (XM1184/XM1187) is a 6.8mm Ball Cartridge / Special Purpose (SP) ammunition packed linked belts with a 6.8mm GP Tracer Cartridge for use in the Next Generation Squad Weapons (NGSW) M250 Automatic Rifle. The XM1184 SP Ball Cartridges utilizes projectiles with an exposed tip surrounded by a copper jacket. The M1187 GP Tracer has a steel penetrator surrounded by a thick-based jacket with a cavity packed with tracer material which lights upon firing. This ammunition is intended for use against a broad spectrum of hard targets. This is a combatonly war reserve item. This item is Code B, not approved for service use. (E06014) CTG 6.8MM REDUCED RANGE ROUND (XM1188) is a 6.8mm Ball Cartridge; a training standard item used for training purposes. The ammunition is packed in cartons for use in the NGSW M7 Rifle/ XM8 Carbine. The Cartridge is intended to perform similarly to the combat variants and is intended for use on military installations including those with Surface Danger Zone (SDZ) restrictions. This item is Code B, not approved for service use. (E06015) CTG 6.8MM SPECIAL PURPOSE ROUND (XM1184) is a 6.8mm Ball Cartridge. The Special Purpose (SP) ammunition is packed in cartons for use in the NGSW M7 Rifle/XM8 Carbine. The SP Ball Cartridge utilizes projectiles with an exposed tip surrounded by a copper jacket. This ammunition is intended for use against a broad spectrum of hard targets. The SP ammunition is a combat-only war reserve item. This item is Code B, not approved for service use. (E06016) CTG 6.8MM GENERAL PURPOSE 4GP/1TRCR LINKED (M1186/XM1187) is a 6.8mm Ball Cartridge / General Purpose (GP) ammunition packed linked belts with a 6.8mm GP Tracer Cartridge for use in the Next Generation Squad Weapons (NGSW) Automatic Rifle. The M1186 GP Ball Cartridges has a steel penetrator and non-lead slug surrounded by a copper jacket. The M1187 Tracer Cartridge has a steel penetrator surrounded by a thick-based jacket with a cavity packed with tracer material which lights upon firing. This ammunition is intended for use against personnel and light-armored targets. The GP and Tracer ammunition are training standard items used in both combat and training. This item is Code B, not approved for service use. LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 1 of 62 P-1 Line #3 Volume 1 - 80 === page 113 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A (E06017) CTG 6.8MM REDUCED RANGE TRCR SINGLE ROUND (XM1189) is a 6.8mm Tracer Cartridge; a training standard item used for training purposes only. The ammunition is packed in carton for use in the NGSW M7 Rifle/XM8 Carbine. The Cartridge contains a cavity packed with tracer material which lights upon firings. It is intended to perform similarly to the combat variants and is intended for use on military installations including those with Surface Danger Zone (SDZ) restrictions. This item is Code B, not approved for service use. (E06018) CTG. 6.8MM GP LNKD (M1186) is a 6.8mm Ball Cartridge / General Purpose (GP) ammunition packed linked belts for use in the Next Generation Squad Weapons (NGSW) M250 Automatic Rifle. The GP Ball Cartridge has a steel penetrator and non-lead slug surrounded by a copper jacket. This ammunition is intended for use against personnel and light-armored targets. The GP ammunition is a training standard item used in both combat and training. This item is Code B, not approved for service use. (E06021) CTG. 6.8MM RRA LNKD (XM1188) is a 6.8mm Ball Cartridge; a training standard item used for training purposes only. The ammunition is packed in linked belts for use in the NGSW M250 Automatic Rifle. The Cartridge is intended to perform similarly to the combat variants and is intended for use on military installations including those with Surface Danger Zone (SDZ) restrictions. This item is Code B, not approved for service use. (E06024) CTG. 6.8MM BLANK LNKD (M1192) is a 6.8mm BLANK cartridge that does not have a projectile. It is designed to mimic the sound and function of the combat ammunition variants. It is intended for training use only and is not suitable for combat. The Blank ammunition is packed in linked configuration for use in the NGSW M250 Automatic Rifle. This item is Code B, not approved for service use. (E06031) CTG 6.8MM GENERAL PURPOSE TRCR SINGLE ROUND (XM1186) is a 6.8mm General Purpose (GP) Tracer Cartridge packed in cartons for use in the Next Generation Squad Weapons (NGSW) M7 Rifle/XM8 Carbine. The GP Tracer Cartridge has a steel penetrator surrounded by a thick-based jacket with a cavity packed with tracer material which lights upon firing. This ammunition is intended for use against personnel and light-armored targets. The GP Tracer ammunition is a training standard item used in both combat and training. This item is Code B, not approved for service use. (E60011) CTG. 6.8MM BLANK ROUND (M1192) is a 6.8mm BLANK cartridge that does not have a projectile. It is designed to mimic the sound and function of the combat ammunition variants. It is intended for training use only and is not suitable for combat. The Blank ammunition is packed in cartons for use in the NGSW M7 Rifle/XM8 Carbine. This item is Code B, not approved for service use. LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 2 of 62 P-1 Line #3 Volume 1 - 81 === page 114 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD P-5 E06002 / NEXT GENERATION COMBAT ROUND [AC84] P-5a, P-21 B P-5 E06012 / CTG 6.8MM SPECIAL PURPOSE 4SP/1TRCR LINKED P-5a, P-21 B P-5 E06014 / NEXT GENERATION REDUCED RANGE ROUND [AC86] P-5a, P-21 B P-5 E06015 / NEXT GENERATION SQUAD WEAPON SPECIAL PURPOSE ROUND [AC94] P-5a, P-21 B P-5 E06016 / CTG 6.8MM GENERAL PURPOSE 4GP/1TRCR LINKED P-5a, P-21 B P-5 E06017 / CTG 6.8MM REDUCED RANGE TRAINING 4RRT/1TRCR LINKED P-5a B P-5 E06018 / CTG 6.8MM GENERAL PURPOSE LINKED [AC85] P-5a, P-21 B P-5 E06021 / CTG 6.8MM REDUCED RANGE TRAINING LINKED [AC87] P-5a, P-21 P-5 E06024 / CTG 6.8MM BLANK LINKED [AC83] P-5a, P-21 P-5 E06031 / CTG 6.8MM GENERAL PURPOSE TRCR SINGLE ROUND P-5 E60011 / NEXT GENERATION BLANK ROUND [AC82] P-40 Total Gross/Weapon System Cost MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 275.545 - - - / - - / 77.243 - / 45.445 - / 56.475 - / 94.491 / - - / 6.715 - / 141.891 - / - / 8.636 - / - - / 141.891 - / 8.636 / 93.274 - / 103.883 - / 180.108 - / - - / 180.108 / 55.378 - / 20.452 - / 49.205 - / - - / 49.205 - / - - / - - / 58.877 - / 41.717 - / - - / 41.717 - / - - / - - / 14.699 - / 3.774 - / - - / 3.774 - / - - / - - / 21.871 - / 10.433 - / - - / 10.433 B - / - - / - - / 15.990 - / 13.167 - / - - / 13.167 B - / - - / - - / 16.692 - / 14.975 - / - - / 14.975 P-5a, P-21 B - / - - / - - / 33.561 - / 31.433 - / - - / 31.433 P-5a, P-21 B - / 26.780 - / 28.313 - / 38.946 - / 41.356 - / - - / 41.356 - / 425.013 - / 233.440 - / 426.177 - / 536.695 - / - - / 536.695 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Base Budget supports critical Army Title 10 war reserve/operational, training, and test requirements in accordance with DoDI 3000.04 (Munitions Requirements Process) and Army Regulation (AR) 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War (OSW) approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. The FY 2027 Base procurement dollars in the amount of $536.695 million supports procurement of 212.122 million cartridges. The Army intends to convert any price advantage created through contract negotiations, other service procurement, and/or Foreign Military Sales (FMS) to increase procurement of NEXT GENERATION SQUAD WEAPON AMMUNITION (NGSW-A) when possible. Funding for this ammunition procurement budget item aligns with the National Defense Strategy. (E06002) CTG. 6.8MM GENERAL PURPOSE COMBAT ROUND / General Purpose (GP) ammunition is a training standard item used in both combat and training. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base Procurement dollars in the amount of $141.891 million supports the procurement of 50.415 million GP cartridges. Type classification date: JUNE 2025. (E06012) CTG 6.8MM SPECIAL PURPOSE 4SP/1TRCR LINKED ammunition is a war reserve item used in combat. FY 2027 request builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base Procurement dollars in the amount of $8.636 million supports the procurement of 0.456 million cartridges. LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 3 of 62 P-1 Line #3 Volume 1 - 82 === page 115 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Type classification date: Projected 4th Quarter FY 2026. (E06014) CTG 6.8MM REDUCED RANGE ROUND is a training unique item not used in combat. FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base Procurement dollars in the amount of $180.108 million supports the procurement of 82.137 million Reduced Range cartridges. Type classification date: Projected 1st Quarter FY 2027. (E06015) CTG 6.8MM SPECIAL PURPOSE ROUND / Special Purpose (SP) ammunition is a war reserve item used in combat. FY 2027 request builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base Procurement dollars in the amount of $49.205 million supports the procurement of 2.125 million SP cartridges and production equipment. Type classification date: Projected 4th Quarter FY 2026. (E06016) CTG 6.8MM GENERAL PURPOSE 4GP/1TRCR LINKED ammunition is a training standard item used in both combat and training. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base Procurement dollars in the amount of $41.717 million supports the procurement of 14.381 million cartridges. Type classification date: Projected 3rd Quarter FY 2027. (E06017) CTG 6.8MM REDUCED RANGE TRAINING 4RRT/1TRCR LINKED is a training unique item not used in combat. FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base Procurement dollars in the amount of $3.774 million supports the procurement of 1.462 million cartridges. Type classification date: Projected 1st Quarter FY 2027. (E06018) CTG 6.8MM GENERAL PURPOSE LINKED ammunition is a training standard item used in both combat and training. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base Procurement dollars in the amount of $10.433 million supports the procurement of 3.524 million cartridges. Type classification date: JUNE 2025. (E06021) CTG 6.8MM REDUCED RANGE TRAINING LINKED is a training unique item not used in combat. FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base Procurement dollars in the amount of $13.167 million supports the procurement of 5.565 million cartridges. Type classification date: Projected 1st Quarter FY 2027. (E06024) CTG 6.8MM BLANK LINKED is a training unique item not used in combat FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base Procurement dollars in the amount of $14.975 million supports the procurement of 9.462 million cartridges. Type classification date: JUNE 2025. (E06031) CTG 6.8MM GENERAL PURPOSE TRCR SINGLE ROUND ammunition is a training standard item used in both combat and training. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base Procurement dollars in the amount of $31.433 million supports the procurement of 11.662 million cartridges. Type classification date: Projected 3rd Quarter FY 2027. (E60011) CTG. 6.8MM BLANK ROUND is a training unique item not used in combat. FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base Procurement dollars in the amount of $41.356 million supports the procurement of 30.933 million BLANK cartridges. Type classification date: JUNE 2025. LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 4 of 62 P-1 Line #3 Volume 1 - 83 === page 116 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E06002 / NEXT GENERATION COMBAT ROUND [AC84] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) 275.545 Less PY Advance Procurement ($ in Millions) - - 56.475 94.491 - Net Procurement (P-1) ($ in Millions) 275.545 Plus CY Advance Procurement ($ in Millions) - - 56.475 94.491 - Total Obligation Authority ($ in Millions) 275.545 - - 56.475 94.491 FY 2027 Base FY 2027 OOC - - 141.891 FY 2027 Total - - - 141.891 - 141.891 - - - 141.891 - 141.891 - - 141.891 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Qty Total Cost 107,053K 266.991 2.22 (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 2.49 53.520 2.43 Subtotal: Recurring Cost - - 266.991 - - - 266.991 - - 53.520 - - 53.520 - First Article Test - - - Acceptance Test - - 0.225 - - 0.012 - - - Subtotal: Support Acceptance Testing Cost - - 0.225 - - Value Engineering - Subtotal: Support - NonRecurring Support Cost - - - - - - Production Engineering - - Subtotal: Support Production Engineering Cost - - ROUND Subtotal: Hardware Cost 24,097,046 37,835,571 91.940 2.64 50,414,577 133.094 - - - 2.64 - 91.940 - - 91.940 - - - - - - - - - - - 0.012 - - - - - 0.125 - - - - - 0.125 - - 8.267 - - 2.817 - - 8.267 - - 2.817 - 0.062 - - - 50,414,577 133.094 - 133.094 - - - - - 133.094 - 133.094 - - - - - 133.094 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2.494 - - 8.726 - - - - - 8.726 - - 2.494 - - 8.726 - - - - - 8.726 - - 0.057 - - 0.071 - - - - - 0.071 Support - Acceptance Testing Cost Support - Non-Recurring Support Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 5 of 62 P-1 Line #3 Volume 1 - 84 === page 117 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E06002 / NEXT GENERATION COMBAT ROUND [AC84] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Subtotal: Support - Quality Assurance Cost - - 0.062 - - - - - 0.057 - - 0.071 - - - - - 0.071 Gross/Weapon System Cost - - 275.545 - - 56.475 - - 94.491 - - 141.891 - - - - - 141.891 Remarks: FY 2026 and FY 2027 unit price increases due to additional ammunition requirements and increasing capacity at vendors. FY 2027 increased unit cost includes full Economic Price Adjustments due to increases in commodity prices. Production Engineering changes from FY 2026 to FY 2027 are commensurate with changes in procurement quantities. (†) indicates the presence of a P-5a LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 6 of 62 P-1 Line #3 Volume 1 - 85 === page 118 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E06002 / NEXT GENERATION COMBAT ROUND [AC84] Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Sep 2025 Sep 2026 19,277,637 2.15 Y 2025 SIG SAUER, INC. / NEWINGTON, NH Option / FFP PICATINNY ARSENAL, NJ Sep 2025 Sep 2026 4,819,409 2.15 Y 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 30,268,457 2.43 Y 2026 SIG SAUER, INC. / NEWINGTON, NH Option / FFP PICATINNY ARSENAL, NJ Mar 2026 Mar 2027 7,567,114 2.43 Y 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Apr 2027 Apr 2028 40,331,662 2.64 Y 2027 SIG SAUER, INC. / NEWINGTON, NH Option / FFP PICATINNY ARSENAL, NJ Apr 2027 Apr 2028 10,082,915 2.64 Y RFP Issue Date indicates the presence of a P-21 Remarks: FY 2026 and 2027 quantity split between vendors will be determined during year of execution based on overall procurement quantities, production capacities and delivery schedules. LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 7 of 62 P-1 Line #3 Volume 1 - 86 === page 119 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E06002 / NEXT GENERATION COMBAT ROUND [AC84] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 107053190 1 2025 ARMY 19.278 .000 19.278 A - - - - - - - - - - - - 1.606 17.671 2 2025 ARMY 4.819 .000 A - - - - - - - - - - - - .402 4.418 1 2026 ARMY 30.268 .000 30.268 A - - - - - - - 30.268 2 2026 ARMY 7.567 .000 A - - - - - - - 1 2027 ARMY 40.332 .000 40.332 40.332 1 2027 MC (‡) 14.946 .000 14.946 14.946 1 2027 Total 55.277 .000 55.277 55.277 2 2027 ARMY 10.083 .000 10.083 10.083 2 2027 MC (‡) 3.736 .000 3.736 3.736 2 2027 Total 13.819 .000 13.819 13.819 4.819 7.567 O C T N O V D E C J A N LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 62 S E P O C T N O V D E C J A N F E B P-1 Line #3 M A R A P R M A Y J U N J U L A U G 7.567 S E P Volume 1 - 87 === page 120 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E06002 / NEXT GENERATION COMBAT ROUND [AC84] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND Prior Years Deliveries: 107053190 1 2025 ARMY 19.278 1.606 17.671 1.606 1.606 1.606 1.606 1.606 1.606 1.606 1.606 1.606 1.606 1.606 2 2025 ARMY 4.819 .402 .402 .402 .402 .402 .402 .402 .402 .402 .402 .402 .402 1 2026 ARMY 30.268 .000 30.268 - - - - - 2.522 2.522 2.522 2.522 2.522 2.522 2.522 2.522 2.522 2.522 2.522 2.522 2 2026 ARMY 7.567 .000 - - - - - .631 .631 .631 .631 .631 .631 .631 .631 .631 .631 .631 .631 1 2027 ARMY 40.332 .000 40.332 A - - - - - - - - - - - - 3.361 3.361 3.361 3.361 3.361 3.361 20.166 1 2027 MC (‡) 14.946 .000 14.946 A - - - - - - - - - - - - 1.245 1.245 1.245 1.245 1.245 1.245 1 2027 Total 55.277 .000 55.277 - - - - - - - - - - - - 4.606 4.606 4.606 4.606 4.606 4.606 27.639 2 2027 ARMY 10.083 .000 10.083 A - - - - - - - - - - - - .840 .840 .840 .840 .840 .840 5.041 2 2027 MC (‡) 3.736 .000 3.736 A - - - - - - - - - - - - .311 .311 .311 .311 .311 .311 1.868 2 2027 Total 13.819 .000 13.819 - - - - - - - - - - - - 1.152 1.152 1.152 1.152 1.152 1.152 6.910 A P R M A Y J U N J U L A U G S E P 4.418 7.567 O C T N O V D E C J A N LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 62 .000 .000 S E P O C T N O V D E C J A N F E B P-1 Line #3 .000 .000 M A R 7.473 Volume 1 - 88 === page 121 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E06002 / NEXT GENERATION COMBAT ROUND [AC84] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 107053190 1 2025 ARMY 19.278 19.278 .000 .000 2 2025 ARMY 4.819 4.819 .000 .000 1 2026 ARMY 30.268 30.268 .000 .000 2 2026 ARMY 7.567 7.567 .000 1 2027 ARMY 40.332 20.166 20.166 3.361 3.361 3.361 3.361 3.361 3.361 1 2027 MC (‡) 14.946 7.473 7.473 1.245 1.245 1.245 1.245 1.245 1.245 1 2027 Total 55.277 27.639 27.639 4.606 4.606 4.606 4.606 4.606 4.606 2 2027 ARMY 10.083 5.041 5.041 .840 .840 .840 .840 .840 .840 2 2027 MC (‡) 3.736 1.868 1.868 .311 .311 .311 .311 .311 .311 2 2027 Total 13.819 6.910 6.910 1.152 1.152 1.152 1.152 1.152 1.152 O C T N O V D E C J A N F E B M A R .000 LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army .000 .000 - - - - - - - - - - - - - - - - - - .000 .000 .000 A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 62 S E P O C T N O V D E C J A N F E B P-1 Line #3 M A R A P R M A Y J U N J U L A U G - .000 S E P Volume 1 - 89 === page 122 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E06002 / NEXT GENERATION COMBAT ROUND [AC84] Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 OLIN WINCHESTER, LLC LCAAP - INDEPENDENCE, MO 2,500,000 4,000,000 5,000,000 6 6 12 18 6 7 12 19 2 SIG SAUER, INC. NEWINGTON, NH 1,125,000 1,406,250 2,250,000 6 6 12 18 6 7 12 19 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 11 of 62 P-1 Line #3 Volume 1 - 90 === page 123 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E06012 / CTG 6.8MM SPECIAL PURPOSE 4SP/1TRCR LINKED MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - 6.715 8.636 - 8.636 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - 6.715 8.636 - 8.636 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - 6.715 8.636 - 8.636 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) - - - - - - 19.05 Subtotal: Recurring Cost - - - - - - - - - - - - - - ROUND Subtotal: Hardware Cost 336,567 6.412 18.09 - 6.412 - - 6.412 - 455,870 8.247 - - - 18.09 455,870 8.247 - 8.247 - - - - - 8.247 - 8.247 - - - - - 8.247 Support - Production Engineering Cost Production Engineering - - - - - - - - 0.303 - - 0.389 - - - - - 0.389 Subtotal: Support Production Engineering Cost - - - - - - - - 0.303 - - 0.389 - - - - - 0.389 Gross/Weapon System Cost - - - - - - - - 6.715 - - 8.636 - - - - - 8.636 Remarks: FY2027 quantity increase to meet accelerated fielding plan. (†) indicates the presence of a P-5a LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 12 of 62 P-1 Line #3 Volume 1 - 91 === page 124 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E06012 / CTG 6.8MM SPECIAL PURPOSE 4SP/1TRCR LINKED Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 336,567 19.05 Y 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 455,870 18.09 Y RFP Issue Date indicates the presence of a P-21 LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 13 of 62 P-1 Line #3 Volume 1 - 92 === page 125 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE Item Number / Title [DODIC]: E06012 / CTG 6.8MM SPECIAL PURPOSE 4SP/1TRCR LINKED Fiscal Year 2026 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND 1 2026 ARMY 336.567 .000 336.567 1 2027 ARMY 455.870 .000 455.870 A - - - - - - - - - - - - 28.050 28.047 28.047 28.047 28.047 28.047 28.047 140.235 A - O C T N O V D E C J A N LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 62 S E P O C T N O V D E C J A N F E B P-1 Line #3 M A R A P R M A Y J U N J U L A U G - 455.870 S E P Volume 1 - 93 === page 126 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE Item Number / Title [DODIC]: E06012 / CTG 6.8MM SPECIAL PURPOSE 4SP/1TRCR LINKED Fiscal Year 2028 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT 196.332 140.235 28.047 28.047 28.047 28.047 28.047 Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND 1 2026 ARMY 336.567 1 2027 ARMY 455.870 .000 455.870 O C T N O V D E C J A N LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army F E B .000 37.991 37.989 37.989 37.989 37.989 37.989 37.989 37.989 37.989 37.989 37.989 37.989 M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 62 S E P O C T N O V D E C J A N F E B P-1 Line #3 .000 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 94 === page 127 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E06012 / CTG 6.8MM SPECIAL PURPOSE 4SP/1TRCR LINKED Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 OLIN WINCHESTER, LLC LCAAP - INDEPENDENCE, MO MSR For 2027 1-8-5 For 2027 MAX For 2027 1,500,000 3,750,000 5,500,000 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 6 12 Total After Oct 1 ALT Prior to Oct 1 18 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 12 18 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 16 of 62 P-1 Line #3 Volume 1 - 95 === page 128 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E06014 / NEXT GENERATION REDUCED RANGE ROUND [AC86] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 - - 77.243 93.274 - - 77.243 93.274 - - 77.243 93.274 FY 2027 Base FY 2027 OOC - - 103.883 180.108 - 180.108 - 180.108 - - - 103.883 - - - 103.883 FY 2027 Total 180.108 - 180.108 - - 180.108 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 2.44 63.940 2.04 Subtotal: Recurring Cost - - 63.940 - - 63.940 - First Article Test Subtotal: Support Acceptance Testing Cost - - 0.016 - - Value Engineering - Subtotal: Support - NonRecurring Support Cost - ROUND Subtotal: Hardware Cost 26,172,706 40,430,392 82.478 2.04 - 82.478 - - 82.478 - - - - 0.016 - - - 3.979 - - 3.979 - 45,876,471 93.588 2.04 82,137,022 167.560 - - - 2.04 - 93.588 - - 93.588 - - - - - - - - - - - - 1.781 - - - - 1.781 - - - 82,137,022 167.560 - 167.560 - - - - - 167.560 - 167.560 - - - - - 167.560 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Support - Acceptance Testing Cost Support - Non-Recurring Support Cost Support - Production Engineering Cost Production Engineering - - 9.308 - - 9.015 - - 10.295 - - 12.548 - - - - - 12.548 Subtotal: Support Production Engineering Cost - - 9.308 - - 9.015 - - 10.295 - - 12.548 - - - - - 12.548 Gross/Weapon System Cost - - 77.243 - - 93.274 - - 103.883 - - 180.108 - - - - - 180.108 Remarks: LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 17 of 62 P-1 Line #3 Volume 1 - 96 === page 129 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E06014 / NEXT GENERATION REDUCED RANGE ROUND [AC86] MDAP/MAIS Code: Production Engineering changes from FY 2026 to FY 2027 are commensurate with changes in procurement quantities. FY 2027 quantity increase to meet accelerated fielding plan due to additional ammunition requirements. (†) indicates the presence of a P-5a LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 18 of 62 P-1 Line #3 Volume 1 - 97 === page 130 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Item Number / Title [DODIC]: E06014 / NEXT GENERATION REDUCED RANGE ROUND [AC86] FY Contractor and Location Method/Type or Funding Vehicle 2025 SIG SAUER, INC. / NEWINGTON, NH Option / FFP PICATINNY ARSENAL, NJ Jun 2025 Jun 2026 40,430,392 2.04 Y 2026 SIG SAUER, INC. / NEWINGTON, NH Option / FFP PICATINNY ARSENAL, NJ Mar 2026 Mar 2027 34,407,353 2.04 Y 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 11,469,118 2.04 Y 2027 SIG SAUER, INC. / NEWINGTON, NH Option / FFP PICATINNY ARSENAL, NJ Apr 2027 Apr 2028 61,602,766 2.04 Y 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Apr 2027 Apr 2028 20,534,256 2.04 Y Location of PCO Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date indicates the presence of a P-21 Remarks: FY 2027 quantity split between vendors will be determined during year of execution based on overall procurement quantities, production capacities and delivery schedules. LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 19 of 62 P-1 Line #3 Volume 1 - 98 === page 131 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E06014 / NEXT GENERATION REDUCED RANGE ROUND [AC86] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 26172706 1 2025 ARMY 40.430 .000 40.430 - - - 3.369 3.369 3.369 1 2026 ARMY 34.407 .000 34.407 A - - - - - - - - - A - - - - - - 3.369 26.954 - 34.407 2 2026 ARMY 11.469 .000 11.469 A - - - - - - - 11.469 1 2027 ARMY 61.603 .000 61.603 2 2027 ARMY 20.534 .000 20.534 61.603 20.534 O C T N O V D E C J A N LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 20 of 62 S E P O C T N O V D E C J A N F E B P-1 Line #3 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 99 === page 132 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E06014 / NEXT GENERATION REDUCED RANGE ROUND [AC86] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT O C T Fiscal Year 2028 Calendar Year 2027 N O V D E C J A N F E B M A R A P R M A Y Calendar Year 2028 J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND Prior Years Deliveries: 26172706 1 2025 ARMY 40.430 13.477 26.954 3.369 3.369 3.369 3.369 3.369 3.369 3.369 3.369 1 2026 ARMY 34.407 .000 34.407 - - - - - 2.867 2.867 2.867 2.867 2.867 2.867 2.867 2.867 2.867 2.867 2.867 2.867 2 2026 ARMY 11.469 .000 11.469 - - - - - .956 .956 .956 .956 .956 .956 .956 .956 .956 .956 .956 .956 1 2027 ARMY 61.603 .000 61.603 A - - - - - - - - - - - 2 2027 ARMY 20.534 .000 20.534 A O C T N O V D E C J A N LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army F E B M A R A P R .000 M A Y J U N J U L A U G UNCLASSIFIED Page 21 of 62 S E P O C T N O V D E C J A N .000 .000 F E B P-1 Line #3 M A R - 5.134 5.134 5.134 5.134 5.134 5.134 30.801 - 1.711 1.711 1.711 1.711 1.711 1.711 10.267 A P R M A Y J U N J U L A U G S E P Volume 1 - 100 === page 133 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E06014 / NEXT GENERATION REDUCED RANGE ROUND [AC86] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND Prior Years Deliveries: 26172706 1 2025 ARMY 40.430 40.430 .000 .000 1 2026 ARMY 34.407 34.407 .000 .000 2 2026 ARMY 11.469 11.469 .000 1 2027 ARMY 61.603 30.801 30.801 5.134 5.134 5.134 5.134 5.134 5.134 2 2027 ARMY 20.534 10.267 10.267 1.711 1.711 1.711 1.711 1.711 1.711 O C T N O V D E C J A N F E B M A R .000 LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army .000 .000 A P R M A Y J U N J U L A U G UNCLASSIFIED Page 22 of 62 S E P O C T N O V D E C J A N F E B P-1 Line #3 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 101 === page 134 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E06014 / NEXT GENERATION REDUCED RANGE ROUND [AC86] Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 SIG SAUER, INC. NEWINGTON, NH 3,375,000 4,218,750 6,750,000 6 6 12 18 6 7 12 19 2 OLIN WINCHESTER, LLC LCAAP - INDEPENDENCE, MO 1,500,000 3,750,000 5,500,000 6 6 12 18 6 7 12 19 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 23 of 62 P-1 Line #3 Volume 1 - 102 === page 135 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E06015 / NEXT GENERATION SQUAD WEAPON SPECIAL PURPOSE ROUND [AC94] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 45.445 55.378 20.452 49.205 - 49.205 - - - - - - 45.445 55.378 20.452 49.205 - 49.205 - - - - - - 45.445 55.378 20.452 49.205 - 49.205 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Qty ($) FY 2025 Total Cost (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 26.62 Subtotal: Recurring Cost - ROUND Subtotal: Hardware Cost 1,518,950 40.436 23.00 - 40.436 - - 40.436 - - - 0.563 - - 2,362,551 54.339 21.66 - 54.339 - - 54.339 - - - - 0.563 - - 901,524 19.527 22.11 - 19.527 - - 19.527 - - - - - - - 2,125,294 46.990 - - - 22.11 2,125,294 46.990 - 46.990 - - - - - 46.990 - 46.990 - - - - - 46.990 - - - - - - - - - - - - - - - - - - - Support - Product Improvement Cost Reliability Subtotal: Support - Product Improvement Cost Support - Production Engineering Cost Production Engineering - - 4.446 - - 1.039 - - 0.925 - - 2.215 - - - - - 2.215 Subtotal: Support Production Engineering Cost - - 4.446 - - 1.039 - - 0.925 - - 2.215 - - - - - 2.215 Gross/Weapon System Cost - - 45.445 - - 55.378 - - 20.452 - - 49.205 - - - - - 49.205 Remarks: FY 2027 increase to meet accelerated fielding plan. Production Engineering changes from FY 2026 to FY 2027 are commensurate with changes in procurement quantities. (†) indicates the presence of a P-5a LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 24 of 62 P-1 Line #3 Volume 1 - 103 === page 136 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E06015 / NEXT GENERATION SQUAD WEAPON SPECIAL PURPOSE ROUND [AC94] Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 PICATINNY ARSENAL / PICATINNY ARSENAL, NJ Option / FP PICATINNY ARSENAL, NJ Aug 2025 Aug 2026 2,362,551 23.00 Y 2026 PICATINNY ARSENAL / PICATINNY ARSENAL, NJ Option / TBD PICATINNY ARSENAL, NJ May 2026 May 2027 546,846 21.66 Y 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / CPFF ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 354,678 21.66 Y 2027 PICATINNY ARSENAL / PICATINNY ARSENAL, NJ Option / TBD PICATINNY ARSENAL, NJ May 2027 May 2028 1,275,176 22.11 Y 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 850,118 22.11 Y RFP Issue Date indicates the presence of a P-21 Remarks: FY 2027 quantity split between vendors will be determined during year of execution based on overall procurement quantities, production capacities and delivery schedules. LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 25 of 62 P-1 Line #3 Volume 1 - 104 === page 137 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E06015 / NEXT GENERATION SQUAD WEAPON SPECIAL PURPOSE ROUND [AC94] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 1518950 1 2025 ARMY 2.363 .000 2.363 1 2026 ARMY .547 .000 .547 2 2026 ARMY .355 .000 .355 1 2027 ARMY 1.275 .000 1.275 2 2027 ARMY .850 .000 .850 A - - - - - - - - - A - - - - .197 .197 1.969 A - - - - - .547 - - - - - - .355 1.275 .850 O C T N O V D E C J A N LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 26 of 62 S E P O C T N O V D E C J A N F E B P-1 Line #3 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 105 === page 138 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E06015 / NEXT GENERATION SQUAD WEAPON SPECIAL PURPOSE ROUND [AC94] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y .046 .046 J U N J U L A U G S E P B A L A N C E COMPLETE ROUND Prior Years Deliveries: 1518950 1 2025 ARMY 2.363 .394 1.969 .197 .197 .197 .197 .197 .197 .197 .197 .197 .197 1 2026 ARMY .547 .000 .547 - - - - - - - .046 .046 .046 .046 .046 .046 .046 .046 .046 .046 2 2026 ARMY .355 .000 .355 - - - - - .030 .030 .030 .030 .030 .030 .030 .030 .030 .030 .030 .030 1 2027 ARMY 1.275 .000 1.275 A - - - - - - - - - - - - .106 .106 .106 .106 .106 .744 2 2027 ARMY .850 .000 .850 - - - - - - - - - - .071 .071 .071 .071 .071 .071 .071 .354 M A R A P R M A Y J U N J U L A U G S E P A O C T N O V D E C J A N LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army F E B M A R A P R M A Y J U N J U L .000 A U G UNCLASSIFIED Page 27 of 62 S E P O C T N O V D E C J A N F E B P-1 Line #3 .000 .000 Volume 1 - 106 === page 139 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E06015 / NEXT GENERATION SQUAD WEAPON SPECIAL PURPOSE ROUND [AC94] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND Prior Years Deliveries: 1518950 1 2025 ARMY 2.363 2.363 .000 .000 1 2026 ARMY .547 .547 .000 .000 2 2026 ARMY .355 .355 .000 1 2027 ARMY 1.275 .531 .744 .106 .106 .106 .106 .106 2 2027 ARMY .850 .496 .354 .071 .071 .071 .071 .071 O C T N O V D E C J A N F E B .000 LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army .106 .106 M A R A P R .000 .000 M A Y J U N J U L A U G UNCLASSIFIED Page 28 of 62 S E P O C T N O V D E C J A N F E B P-1 Line #3 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 107 === page 140 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E06015 / NEXT GENERATION SQUAD WEAPON SPECIAL PURPOSE ROUND [AC94] Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 PICATINNY ARSENAL PICATINNY ARSENAL, NJ 50,000 100,000 250,000 8 8 12 20 8 8 12 20 2 OLIN WINCHESTER, LLC LCAAP - INDEPENDENCE, MO 100,000 500,000 1,000,000 6 6 12 18 6 6 12 18 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 29 of 62 P-1 Line #3 Volume 1 - 108 === page 141 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E06016 / CTG 6.8MM GENERAL PURPOSE 4GP/1TRCR LINKED MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - 58.877 41.717 - 41.717 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - 58.877 41.717 - 41.717 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - 58.877 41.717 - 41.717 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) - - - - - - 2.52 Subtotal: Recurring Cost - - - - - - - - - - - - - - ROUND Subtotal: Hardware Cost 22,743,172 57.313 2.72 - 57.313 - - 57.313 - 14,380,581 39.115 - - - 2.72 14,380,581 39.115 - 39.115 - - - - - 39.115 - 39.115 - - - - - 39.115 Support - Production Engineering Cost Production Engineering - - - - - - - - 1.564 - - 2.602 - - - - - 2.602 Subtotal: Support Production Engineering Cost - - - - - - - - 1.564 - - 2.602 - - - - - 2.602 Gross/Weapon System Cost - - - - - - - - 58.877 - - 41.717 - - - - - 41.717 Remarks: FY 2026 to FY 2027 increase in Production Engineering support costs is because FY 2026 is a New Start program. FY 2027 captures the full year production support costs, while FY 2026 reflects costs for partial year support. FY 2027 unit cost reflects linked configuration pricing. The price difference between FY 2026 and FY 2027 is due to lower demand resulting in a lower quantity for a higher price range on the step ladder pricing matrix. (†) indicates the presence of a P-5a LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 30 of 62 P-1 Line #3 Volume 1 - 109 === page 142 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E06016 / CTG 6.8MM GENERAL PURPOSE 4GP/1TRCR LINKED Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 22,743,172 2.52 Y 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 14,380,581 2.72 Y RFP Issue Date indicates the presence of a P-21 LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 31 of 62 P-1 Line #3 Volume 1 - 110 === page 143 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE Item Number / Title [DODIC]: E06016 / CTG 6.8MM GENERAL PURPOSE 4GP/1TRCR LINKED Fiscal Year 2026 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.895 1.895 1.895 1.895 1.895 1.895 1.895 9.476 A - - - - - - - 14.381 COMPLETE ROUND 1 2026 ARMY 22.743 .000 22.743 1 2027 ARMY 14.381 .000 14.381 A O C T N O V D E C J A N LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 32 of 62 S E P O C T N O V D E C J A N F E B P-1 Line #3 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 111 === page 144 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E06016 / CTG 6.8MM GENERAL PURPOSE 4GP/1TRCR LINKED Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B Calendar Year 2029 M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B 1.198 1.198 1.198 1.198 1.198 1.198 1.198 1.198 1.198 1.198 1.198 1.198 M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND 1 2026 ARMY 22.743 1 2027 ARMY 14.381 13.267 9.476 1.895 1.895 1.895 1.895 1.895 - - - - - .000 14.381 O C T N O V D E C J A N LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army F E B .000 UNCLASSIFIED Page 33 of 62 P-1 Line #3 .000 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 112 === page 145 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E06016 / CTG 6.8MM GENERAL PURPOSE 4GP/1TRCR LINKED Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 OLIN WINCHESTER, LLC LCAAP - INDEPENDENCE, MO MSR For 2027 1-8-5 For 2027 MAX For 2027 850,000 1,360,000 1,700,000 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 6 12 Total After Oct 1 ALT Prior to Oct 1 18 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 12 18 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 34 of 62 P-1 Line #3 Volume 1 - 113 === page 146 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E06017 / CTG 6.8MM REDUCED RANGE TRAINING 4RRT/1TRCR LINKED MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - 14.699 3.774 - 3.774 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - 14.699 3.774 - 3.774 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - 14.699 3.774 - 3.774 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) - - - - - - 2.35 Subtotal: Recurring Cost - - - - - - - - - - - - - - ROUND Subtotal: Hardware Cost 6,232,278 14.646 2.42 - 14.646 - - 14.646 - 1,461,534 3.537 - - - 2.42 1,461,534 3.537 - 3.537 - - - - - 3.537 - 3.537 - - - - - 3.537 Support - Production Engineering Cost Production Engineering - - - - - - - - 0.053 - - 0.237 - - - - - 0.237 Subtotal: Support Production Engineering Cost - - - - - - - - 0.053 - - 0.237 - - - - - 0.237 Gross/Weapon System Cost - - - - - - - - 14.699 - - 3.774 - - - - - 3.774 Remarks: FY 2026 to FY 2027 increase in Production Engineering support costs is because FY 2026 is a New Start program. FY 2027 captures the full year production support costs, while FY 2026 reflects costs for partial year support. (†) indicates the presence of a P-5a LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 35 of 62 P-1 Line #3 Volume 1 - 114 === page 147 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Method/Type or Funding Vehicle Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 6,232,278 2.35 Y 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 1,461,534 2.42 Y LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army Location of PCO Item Number / Title [DODIC]: E06017 / CTG 6.8MM REDUCED RANGE TRAINING 4RRT/1TRCR LINKED UNCLASSIFIED Page 36 of 62 P-1 Line #3 RFP Issue Date Volume 1 - 115 === page 148 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E06018 / CTG 6.8MM GENERAL PURPOSE LINKED [AC85] MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - 21.871 10.433 - 10.433 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - 21.871 10.433 - 10.433 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - 21.871 10.433 - 10.433 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) - - - - - - 2.48 Subtotal: Recurring Cost - - - - - - - - - - - - - - ROUND Subtotal: Hardware Cost 8,805,283 21.837 2.78 - 21.837 - - 21.837 - 3,524,184 9.797 - - - 2.78 3,524,184 9.797 - 9.797 - - - - - 9.797 - 9.797 - - - - - 9.797 Support - Production Engineering Cost Production Engineering - - - - - - - - 0.034 - - 0.636 - - - - - 0.636 Subtotal: Support Production Engineering Cost - - - - - - - - 0.034 - - 0.636 - - - - - 0.636 Gross/Weapon System Cost - - - - - - - - 21.871 - - 10.433 - - - - - 10.433 Remarks: The price difference between FY 2026 and FY 2027 is due to lower demand resulting in a lower quantity for a higher price range on the step ladder pricing matrix. (†) indicates the presence of a P-5a LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 37 of 62 P-1 Line #3 Volume 1 - 116 === page 149 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Method/Type or Funding Vehicle Item Number / Title [DODIC]: E06018 / CTG 6.8MM GENERAL PURPOSE LINKED [AC85] Location of PCO Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 TO BE SELECTED / TO BE SELECTED Option / FFP TO BE SELECTED Mar 2026 Mar 2027 8,805,283 2.48 Y 2027 TO BE SELECTED / TO BE SELECTED Option / FFP TO BE SELECTED Apr 2027 Apr 2028 3,524,184 2.78 Y RFP Issue Date indicates the presence of a P-21 Remarks: FY 2027 quantity too low to award to multiple vendors. Specific vendor will be determined during year of execution based on overall procurement quantities and production capacity of each vendor in relation to required delivery schedules. LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 38 of 62 P-1 Line #3 Volume 1 - 117 === page 150 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E06018 / CTG 6.8MM GENERAL PURPOSE LINKED [AC85] Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P .734 .734 .734 .734 .734 .734 3.669 A - - - - - - 3.524 COMPLETE ROUND 1 2026 ARMY 8.805 .000 8.805 1 2027 ARMY 3.524 .000 3.524 A O C T N O V D E C J A N LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 39 of 62 S E P O C T N O V D E C J A N F E B P-1 Line #3 .734 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 118 === page 151 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E06018 / CTG 6.8MM GENERAL PURPOSE LINKED [AC85] Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R Calendar Year 2029 A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R .294 .294 .294 .294 .294 .294 .294 .294 .294 .294 .294 .294 A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND 1 2026 ARMY 8.805 5.136 3.669 .734 .734 .734 .734 .734 1 2027 ARMY 3.524 .000 3.524 - - - - - O C T N O V D E C J A N LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army F E B .000 M A R UNCLASSIFIED Page 40 of 62 P-1 Line #3 .000 A P R M A Y J U N J U L A U G S E P Volume 1 - 119 === page 152 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E06018 / CTG 6.8MM GENERAL PURPOSE LINKED [AC85] Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 TO BE SELECTED - TO BE SELECTED MSR For 2027 1-8-5 For 2027 MAX For 2027 375,000 468,750 750,000 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 6 12 Total After Oct 1 ALT Prior to Oct 1 18 ALT After Oct 1 6 Manufacturing PLT 7 Total After Oct 1 12 19 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 41 of 62 P-1 Line #3 Volume 1 - 120 === page 153 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E06021 / CTG 6.8MM REDUCED RANGE TRAINING LINKED [AC87] MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - 15.990 13.167 - 13.167 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - 15.990 13.167 - 13.167 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - 15.990 13.167 - 13.167 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) - - - - - - 2.22 Subtotal: Recurring Cost - - - - - - - - - - - - - - ROUND Subtotal: Hardware Cost 6,885,314 15.285 2.22 - 15.285 - - 15.285 - 5,565,280 12.355 - - - 2.22 5,565,280 12.355 - 12.355 - - - - - 12.355 - 12.355 - - - - - 12.355 Support - Production Engineering Cost Production Engineering - - - - - - - - 0.705 - - 0.812 - - - - - 0.812 Subtotal: Support Production Engineering Cost - - - - - - - - 0.705 - - 0.812 - - - - - 0.812 Gross/Weapon System Cost - - - - - - - - 15.990 - - 13.167 - - - - - 13.167 Remarks: FY 2026 to FY 2027 increase in Production Engineering support costs is because FY 2026 is a New Start program. FY 2027 captures the full year production support costs, while FY 2026 reflects costs for partial year support. (†) indicates the presence of a P-5a LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 42 of 62 P-1 Line #3 Volume 1 - 121 === page 154 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E06021 / CTG 6.8MM REDUCED RANGE TRAINING LINKED [AC87] Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 1,377,063 2.22 Y 2026 SIG SAUER, INC. / NEWINGTON, NH Option / FFP PICATINNY ARSENAL, NJ Mar 2026 Mar 2027 5,508,251 2.22 Y 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Apr 2027 Apr 2028 1,113,056 2.22 Y 2027 SIG SAUER, INC. / NEWINGTON, NH Option / FFP PICATINNY ARSENAL, NJ Apr 2027 Apr 2028 4,452,224 2.22 Y RFP Issue Date indicates the presence of a P-21 Remarks: FY 2027 quantity split between vendors will be determined during year of execution based on overall procurement quantities, production capacities and delivery schedules. LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 43 of 62 P-1 Line #3 Volume 1 - 122 === page 155 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E06021 / CTG 6.8MM REDUCED RANGE TRAINING LINKED [AC87] Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND 1 2026 ARMY 1.377 .000 1.377 A - - - - - - - - - - - - .115 .115 .115 .115 .115 .115 .115 .574 2 2026 ARMY 5.508 .000 5.508 A - - - - - - - - - - - - .459 .459 .459 .459 .459 .459 .459 2.295 1 2027 ARMY 1.113 .000 1.113 A - - - - - - 1.113 2 2027 ARMY 4.452 .000 4.452 A - - - - - - 4.452 O C T N O V D E C J A N LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 44 of 62 S E P O C T N O V D E C J A N F E B P-1 Line #3 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 123 === page 156 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E06021 / CTG 6.8MM REDUCED RANGE TRAINING LINKED [AC87] Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND 1 2026 ARMY 1.377 .803 .574 .115 .115 .115 .115 .115 2 2026 ARMY 5.508 3.213 2.295 .459 .459 .459 .459 .459 1 2027 ARMY 1.113 .000 1.113 - - - - - - .093 .093 .093 .093 .093 .093 .093 .093 .093 .093 .093 .093 2 2027 ARMY 4.452 .000 4.452 - - - - - - .371 .371 .371 .371 .371 .371 .371 .371 .371 .371 .371 .371 A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R O C T N O V D E C J A N LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army F E B .000 .000 M A R UNCLASSIFIED Page 45 of 62 P-1 Line #3 .000 .000 A P R M A Y J U N J U L A U G S E P Volume 1 - 124 === page 157 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E06021 / CTG 6.8MM REDUCED RANGE TRAINING LINKED [AC87] Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 OLIN WINCHESTER, LLC LCAAP - INDEPENDENCE, MO 1,500,000 3,750,000 5,500,000 6 6 12 18 6 7 12 19 2 SIG SAUER, INC. NEWINGTON, NH 1,125,000 1,406,250 2,250,000 6 6 12 18 6 7 12 19 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 46 of 62 P-1 Line #3 Volume 1 - 125 === page 158 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E06024 / CTG 6.8MM BLANK LINKED [AC83] MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - 16.692 14.975 - 14.975 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - 16.692 14.975 - 14.975 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - 16.692 14.975 - 14.975 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) - - - - - - 1.40 Subtotal: Recurring Cost - - - - - - - - - - - - - - ROUND Subtotal: Hardware Cost 11,213,336 15.699 1.46 - 15.699 - - 15.699 - 9,462,263 13.815 - - - 1.46 9,462,263 13.815 - 13.815 - - - - - 13.815 - 13.815 - - - - - 13.815 Support - Production Engineering Cost Production Engineering - - - - - - - - 0.993 - - 1.160 - - - - - 1.160 Subtotal: Support Production Engineering Cost - - - - - - - - 0.993 - - 1.160 - - - - - 1.160 Gross/Weapon System Cost - - - - - - - - 16.692 - - 14.975 - - - - - 14.975 Remarks: FY 2027 unit cost includes full Economic Price Adjustments due to increases in commodity prices. FY 2026 to FY 2027 increase in Production Engineering support costs is because FY 2026 is a New Start program. FY 2027 captures the full year production support costs, while FY 2026 reflects costs for partial year support. (†) indicates the presence of a P-5a LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 47 of 62 P-1 Line #3 Volume 1 - 126 === page 159 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Item Number / Title [DODIC]: E06024 / CTG 6.8MM BLANK LINKED [AC83] FY Contractor and Location Method/Type or Funding Vehicle 2026 SIG SAUER, INC. / NEWINGTON, NH Option / FFP PICATINNY ARSENAL, NJ Mar 2026 Mar 2027 11,213,336 1.40 Y 2027 SIG SAUER, INC. / NEWINGTON, NH Option / FFP PICATINNY ARSENAL, NJ Apr 2027 Apr 2028 9,462,263 1.46 Y Location of PCO Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date indicates the presence of a P-21 LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 48 of 62 P-1 Line #3 Volume 1 - 127 === page 160 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE Item Number / Title [DODIC]: E06024 / CTG 6.8MM BLANK LINKED [AC83] Fiscal Year 2026 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P .934 .934 .934 .934 .934 .934 4.672 A - - - - - - 9.462 COMPLETE ROUND 1 2026 ARMY 11.213 .000 11.213 1 2027 ARMY 9.462 .000 A - - - - - - - - - - - - .934 9.462 O C T N O V D E C J A N LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 49 of 62 S E P O C T N O V D E C J A N F E B P-1 Line #3 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 128 === page 161 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E06024 / CTG 6.8MM BLANK LINKED [AC83] Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R Calendar Year 2029 A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R .789 .789 .789 .789 .789 .789 .789 .789 .789 .789 .789 .789 A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND 1 2026 ARMY 11.213 6.541 4.672 .934 .934 .934 .934 .934 1 2027 ARMY 9.462 .000 9.462 - - - - - O C T N O V D E C J A N LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army F E B .000 M A R UNCLASSIFIED Page 50 of 62 P-1 Line #3 .000 A P R M A Y J U N J U L A U G S E P Volume 1 - 129 === page 162 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E06024 / CTG 6.8MM BLANK LINKED [AC83] Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 SIG SAUER, INC. NEWINGTON, NH MSR For 2027 1-8-5 For 2027 MAX For 2027 750,000 937,500 1,500,000 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 6 12 Total After Oct 1 ALT Prior to Oct 1 18 ALT After Oct 1 6 Manufacturing PLT 7 Total After Oct 1 12 19 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 51 of 62 P-1 Line #3 Volume 1 - 130 === page 163 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E06031 / CTG 6.8MM GENERAL PURPOSE TRCR SINGLE ROUND MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - 33.561 31.433 - 31.433 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - 33.561 31.433 - 31.433 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - 33.561 31.433 - 31.433 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) - - - - - - 2.48 Subtotal: Recurring Cost - - - - - - - - - - - - - - ROUND Subtotal: Hardware Cost 13,210,546 32.762 2.53 - 32.762 - - 32.762 - 11,662,230 29.505 - - - 2.53 11,662,230 29.505 - 29.505 - - - - - 29.505 - 29.505 - - - - - 29.505 Support - Production Engineering Cost Production Engineering - - - - - - - - 0.799 - - 1.928 - - - - - 1.928 Subtotal: Support Production Engineering Cost - - - - - - - - 0.799 - - 1.928 - - - - - 1.928 Gross/Weapon System Cost - - - - - - - - 33.561 - - 31.433 - - - - - 31.433 Remarks: FY 2027 unit cost includes full Economic Price Adjustments due to increases in commodity prices. FY 2026 to FY 2027 increase in Production Engineering support costs is because FY 2026 is a New Start program. FY 2027 captures the full year production support costs, while FY 2026 reflects costs for partial year support. (†) indicates the presence of a P-5a LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 52 of 62 P-1 Line #3 Volume 1 - 131 === page 164 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E06031 / CTG 6.8MM GENERAL PURPOSE TRCR SINGLE ROUND Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 13,210,546 2.48 Y 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 11,662,230 2.53 Y RFP Issue Date indicates the presence of a P-21 LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 53 of 62 P-1 Line #3 Volume 1 - 132 === page 165 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE Item Number / Title [DODIC]: E06031 / CTG 6.8MM GENERAL PURPOSE TRCR SINGLE ROUND Fiscal Year 2026 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1.101 1.101 1.101 1.101 1.101 1.101 1.101 5.504 A - - - - - - - 11.662 COMPLETE ROUND 1 2026 ARMY 13.211 .000 13.211 1 2027 ARMY 11.662 .000 11.662 A O C T N O V D E C J A N LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 54 of 62 S E P O C T N O V D E C J A N F E B P-1 Line #3 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 133 === page 166 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E06031 / CTG 6.8MM GENERAL PURPOSE TRCR SINGLE ROUND Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B Calendar Year 2029 M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B .972 .972 .972 .972 .972 .972 .972 .972 .972 .972 .972 .972 M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND 1 2026 ARMY 13.211 7.706 1 2027 ARMY 11.662 .000 11.662 5.504 1.101 1.101 1.101 1.101 1.101 - - - - - O C T N O V D E C J A N LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army F E B .000 UNCLASSIFIED Page 55 of 62 P-1 Line #3 .000 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 134 === page 167 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E06031 / CTG 6.8MM GENERAL PURPOSE TRCR SINGLE ROUND Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 OLIN WINCHESTER, LLC LCAAP - INDEPENDENCE, MO MSR For 2027 1-8-5 For 2027 MAX For 2027 1,500,000 3,750,000 5,500,000 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 8 18 Total After Oct 1 ALT Prior to Oct 1 26 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 12 18 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 56 of 62 P-1 Line #3 Volume 1 - 135 === page 168 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E60011 / NEXT GENERATION BLANK ROUND [AC82] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 26.780 28.313 38.946 41.356 - 41.356 - - - - - - 26.780 28.313 38.946 41.356 - 41.356 - - - - - - 26.780 28.313 38.946 41.356 - 41.356 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Qty ($) FY 2025 Total Cost (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 1.36 Subtotal: Recurring Cost - Acceptance Test First Article Test Subtotal: Support Acceptance Testing Cost ROUND Subtotal: Hardware Cost 15,619,826 21.180 1.30 - 21.180 - - 21.180 - - - 0.053 - - 0.010 - - 19,403,643 25.225 1.23 - 25.225 - - 25.225 - - - - - - - 0.063 - - 29,034,930 35.713 1.23 - 35.713 - - 35.713 - - - - - - - - - - 30,933,191 38.048 - - - 1.23 30,933,191 38.048 - 38.048 - - - - - 38.048 - 38.048 - - - - - 38.048 - - - - - - - - - - - - - - - - - - - - - - - - - - - - Support - Acceptance Testing Cost Support - Production Engineering Cost Production Engineering - - 5.534 - - 3.088 - - 3.233 - - 3.308 - - - - - 3.308 Subtotal: Support Production Engineering Cost - - 5.534 - - 3.088 - - 3.233 - - 3.308 - - - - - 3.308 Gross/Weapon System Cost - - 26.780 - - 28.313 - - 38.946 - - 41.356 - - - - - 41.356 Remarks: FY 2026 and FY 2027 quantity increases to meet accelerated fielding plan due to additional ammunition requirements. (†) indicates the presence of a P-5a LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 57 of 62 P-1 Line #3 Volume 1 - 136 === page 169 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Item Number / Title [DODIC]: E60011 / NEXT GENERATION BLANK ROUND [AC82] FY Contractor and Location Method/Type or Funding Vehicle 2025 SIG SAUER, INC. / NEWINGTON, NH Option / FFP PICATINNY ARSENAL, NJ Jun 2025 Jun 2026 19,403,643 1.30 Y 2026 SIG SAUER, INC. / NEWINGTON, NH Option / FFP PICATINNY ARSENAL, NJ Mar 2026 Mar 2027 29,034,930 1.23 Y 2027 SIG SAUER, INC. / NEWINGTON, NH Option / FFP PICATINNY ARSENAL, NJ Apr 2027 Apr 2028 30,933,191 1.23 Y Location of PCO Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date indicates the presence of a P-21 LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 58 of 62 P-1 Line #3 Volume 1 - 137 === page 170 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E60011 / NEXT GENERATION BLANK ROUND [AC82] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 15619826 1 2025 ARMY 19.404 .000 19.404 1 2026 ARMY 29.035 .000 29.035 1 2027 ARMY 30.933 .000 30.933 A - - - - - - - - - - - - 1.617 1.617 1.617 A - - - - - - 1.617 12.936 - 29.035 30.933 O C T N O V D E C J A N LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 59 of 62 S E P O C T N O V D E C J A N F E B P-1 Line #3 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 138 === page 171 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E60011 / NEXT GENERATION BLANK ROUND [AC82] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y Calendar Year 2028 J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND Prior Years Deliveries: 15619826 1 2025 ARMY 19.404 6.468 12.936 1.617 1.617 1.617 1.617 1.617 1.617 1.617 1.617 1 2026 ARMY 29.035 .000 29.035 - - - - - 2.420 2.420 2.420 2.420 2.420 2.420 2.420 2.420 2.420 2.420 2.420 2.420 1 2027 ARMY 30.933 .000 30.933 A - - - - - - - - - - - O C T N O V D E C J A N LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army F E B M A R A P R M A Y .000 J U N J U L A U G UNCLASSIFIED Page 60 of 62 S E P O C T N O V D E C J A N F E B P-1 Line #3 .000 M A R 2.578 2.578 2.578 2.578 2.578 2.578 15.467 A P R M A Y J U N J U L A U G S E P Volume 1 - 139 === page 172 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E60011 / NEXT GENERATION BLANK ROUND [AC82] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND Prior Years Deliveries: 15619826 1 2025 ARMY 19.404 19.404 .000 1 2026 ARMY 29.035 29.035 .000 1 2027 ARMY 30.933 15.467 15.467 .000 .000 2.578 2.578 2.578 2.578 2.578 2.578 O C T N O V D E C J A N F E B M A R LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army .000 A P R M A Y J U N J U L A U G UNCLASSIFIED Page 61 of 62 S E P O C T N O V D E C J A N F E B P-1 Line #3 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 140 === page 173 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1065E06001 / NEXT GENERATION SQUAD WEAPON AMMUNITION Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E60011 / NEXT GENERATION BLANK ROUND [AC82] Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 SIG SAUER, INC. NEWINGTON, NH MSR For 2027 1-8-5 For 2027 MAX For 2027 2,250,000 2,812,500 4,500,000 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 6 12 Total After Oct 1 ALT Prior to Oct 1 18 ALT After Oct 1 6 Manufacturing PLT 7 Total After Oct 1 12 19 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1065E06001 - NEXT GENERATION SQUAD WEAPON AMMUNITION Army UNCLASSIFIED Page 62 of 62 P-1 Line #3 Volume 1 - 141 === page 174 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition P-1 Line Item Number / Title: 1450EA3000 / CTG, Handgun, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 59.870 6.847 7.750 6.719 - 6.719 8.086 8.090 8.375 8.459 - - - - - - - - - - - - 59.870 6.847 7.750 6.719 - 6.719 8.086 8.090 8.375 8.459 - - - - - - - - - - - - 59.870 6.847 7.750 6.719 - 6.719 8.086 8.090 8.375 8.459 - Total 114.196 114.196 114.196 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line includes CTG, Handgun, ALL TYPES. (E05218) CTG, MODULAR HANDGUN SYSTEM (MHS) AMMUNITION for the M17, and M18 (compact version) of the Modular Handgun System, and Glock 19 Gen 5 consists of five new 9MM cartridges Ball M1152, Special Purpose M1153, Drill Dummy Inert (DDI) M1156, Blank M1157 and 9MM 135 grain +P law enforcement/Criminal Investigation Division (CID) munition. The Ball cartridge is intended for use against enemy personnel, for training, and for force protection. The Special Purpose cartridge is required for use in situations where limited over-penetration of targets is necessary to reduce collateral damage in military environments. DDI cartridges are completely inert, plated and drilled for easy identification and used for training and weapon familiarization. Blank cartridges are used for K-9 training through the use of a weapon adapter kit. These items are type classified, Code A, approved for service. 9MM 135 grain +P law enforcement cartridge/Criminal Investigation Division (CID) munition is used to further limit overpenetration of targets to reduce collateral damage for specific civilian criminal engagements. This item is Code B, not approved for service use. (E96105) CTG, 9MM MARKING, M1041 (BLUE) is used for force-on-force training engagements. The cartridge can be fired with existing M9/M11/MHS pistols and M4 rifles with use of a conversion kit. The M9 kit consists of a replacement barrel only. The M11 kit consists of a replacement barrel and recoil spring guide. The M4 kit consist of a replacement upper receiver for 9mm. A blue enameled portion of the M9, M11, and M4 barrels is visible through the ejection port of the weapons. The projectile leaves a mark upon impact (similar to paintball), enabling after action evaluation of training scenarios. It differs from paintball in that it is a full complete cartridge with projectile and cartridge case containing a propulsion system for a low velocity launch. The M1041 is required to hit targets accurately out to 12 meters. The cartridge has been safety certified to be fired in close proximity at properly protected human subjects. This item is Code A, approved for service use. (E96107) CTG, 9MM MARKING, M1041 (RED) is used for force-on-force training engagements. The cartridge can be fired with existing M9/M11/MHS pistols, and M4 rifles with use of a conversion kit. The M9 kit consists of a replacement barrel only. The M11 kit consists of a replacement barrel and recoil spring guide. The M4 kit consist of a replacement upper receiver for 9mm. A blue enameled portion of the M9, M11 and M4 barrels is visible through the ejection port of the weapons. The projectile leaves a mark upon impact (similar to paintball), enabling after action evaluation of training scenarios. It differs from paintball in that it is a full complete cartridge with projectile and cartridge case containing a propulsion system for a low velocity launch. The M1041 is required to hit targets accurately out to 12 meters. The cartridge has been safety certified to be fired in close proximity at properly protected human subjects. This item is Code A, approved for service use. LI 1450EA3000 - CTG, Handgun, All Types Army UNCLASSIFIED Page 1 of 9 P-1 Line #4 Volume 1 - 142 === page 175 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition P-1 Line Item Number / Title: 1450EA3000 / CTG, Handgun, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 E05218 / CTG, Modular Handgun Ammo P-5a A - / 52.778 - / 6.709 - / 7.609 - / 6.575 - / - - / 6.575 P-5 E96105 / CTG, 9mm Marking, M1041 (Blue) [AC36] P-5a A - / 4.270 - / 0.071 - / 0.073 - / 0.075 - / - - / 0.075 P-5 E96107 / CTG, 9mm Marking, M1041 (Red) [AC37] P-5a A - / 2.822 - / 0.067 - / 0.068 - / 0.069 - / - - / 0.069 P-40 Total Gross/Weapon System Cost - / 59.870 - / 6.847 - / 7.750 - / 6.719 - / - - / 6.719 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 base budget supports critical Army Title 10 war reserve/operational, training, and test requirements in accordance with DoDI 3000.04 (Munitions Requirements Process) and AR 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War (OSW)-approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life-cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. FY 2027 Total Base dollars in the amount of $6.719 million supports the procurement of 18.001 million cartridges. (E05218) CTG MODULAR HANDGUN SYSTEM AMMUNITION is a training standard item used in both training and combat. The 9mm Criminal Investigation Division (CID) munition is a training standard item used for training and in law enforcement operations. The FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $6.575 million supports the procurement of 16.339 million 9mm Modular Handgun cartridges and 1.449 million 9mm CID cartridges. Type Classification Dates: M1152/M1153/M1156 June 2019; M1157 Blank November 2022 9mm CID Type classification date: PENDING (E96105) CTG 9MM MARKING, M1041 (BLUE) is a training unique item not used in combat. FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $0.075 million supports the procurement of 0.110 million 9mm Marking, M1041 (Blue) cartridges. Type Classification Date: 2009 (E96107) CTG, 9MM MARKING, M1041 (RED) is a training unique item not used in combat. FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $0.069 million supports the procurement of 0.103 million 9mm Marking, M1041 (Red) cartridges. Type Classification Date: 2009 LI 1450EA3000 - CTG, Handgun, All Types Army UNCLASSIFIED Page 2 of 9 P-1 Line #4 Volume 1 - 143 === page 176 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1450EA3000 / CTG, Handgun, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E05218 / CTG, Modular Handgun Ammo MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 52.778 6.709 7.609 6.575 - 6.575 - - - - - - 52.778 6.709 7.609 6.575 - 6.575 - - - - - - 52.778 6.709 7.609 6.575 - 6.575 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE 46.785 0.24 5.915 0.26 - - - - 46.717 - - - - - 5.915 - - - 46.717 - - 5.915 First Article Test - - Acceptance Test - - 0.005 - - 0.020 - - Subtotal: Support Acceptance Testing Cost - - 0.025 - - Reliability Environmental Initiatives - - 0.030 - - - 0.038 - Subtotal: Support - Product Improvement Cost - - 0.068 Production Engineering - - Subtotal: Support Production Engineering Cost - - ROUND (†) 0.20 (†) - 9MM CID Subtotal: Recurring Cost Subtotal: Hardware Cost 233,583K 24,492,988 24,124,840 6.272 0.26 16,339,484 4.248 - - - 0.26 16,339,484 4.248 - - 0.64 1,448,709 0.927 - - - 0.64 1,448,709 0.927 - 6.272 - - 5.175 - - - - - 5.175 - - 6.272 - - 5.175 - - - - - 5.175 - - - - - - - - - - - - - 0.032 - - 0.010 - - 0.006 - - - - - 0.006 0.032 - - 0.010 - - 0.006 - - - - - 0.006 - - - - - - - - - - - - - - - 0.033 - - 0.034 - - 0.035 - - - - - 0.035 - - 0.033 - - 0.034 - - 0.035 - - - - - 0.035 5.878 - - 0.719 - - 1.180 - - 1.299 - - - - - 1.299 - 5.878 - - 0.719 - - 1.180 - - 1.299 - - - - - 1.299 - 0.087 - - 0.009 - - 0.017 - - 0.018 - - - - - 0.018 Support - Acceptance Testing Cost Support - Product Improvement Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance LI 1450EA3000 - CTG, Handgun, All Types Army UNCLASSIFIED Page 3 of 9 P-1 Line #4 Volume 1 - 144 === page 177 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1450EA3000 / CTG, Handgun, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E05218 / CTG, Modular Handgun Ammo MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Subtotal: Support - Quality Assurance Cost - - 0.087 - - 0.009 - - 0.017 - - 0.018 - - - - - 0.018 Gross/Weapon System Cost - - 52.778 - - 6.709 - - 7.609 - - 6.575 - - - - - 6.575 (†) indicates the presence of a P-5a LI 1450EA3000 - CTG, Handgun, All Types Army UNCLASSIFIED Page 4 of 9 P-1 Line #4 Volume 1 - 145 === page 178 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements COMPLETE ROUND COMPLETE ROUND COMPLETE ROUND 9MM CID O O C P-1 Line Item Number / Title: 1450EA3000 / CTG, Handgun, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 OLIN CORPORATION WINCHESTER / OXFORD, MS Option / FFP ROCK ISLAND ARSENAL, IL Feb 2025 Mar 2026 24,492,988 0.24 Y 2026 OLIN CORPORATION WINCHESTER / OXFORD, MS Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 24,124,840 0.26 Y 2027 OLIN CORPORATION WINCHESTER / OXFORD, MS Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 16,339,484 0.26 Y 2027 TO BE SELECTED / TBS01 C / FPEPA TBD Jun 2027 Jun 2028 1,448,709 0.64 N LI 1450EA3000 - CTG, Handgun, All Types Army Location of PCO Item Number / Title [DODIC]: E05218 / CTG, Modular Handgun Ammo UNCLASSIFIED Page 5 of 9 P-1 Line #4 RFP Issue Date Volume 1 - 146 === page 179 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1450EA3000 / CTG, Handgun, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E96105 / CTG, 9mm Marking, M1041 (Blue) [AC36] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 4.270 0.071 0.073 0.075 - 0.075 - - - - - - 4.270 0.071 0.073 0.075 - 0.075 - - - - - - 4.270 0.071 0.073 0.075 - 0.075 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Qty ($) FY 2025 Total Cost (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Complete Round (†) Subtotal: Recurring Cost Subtotal: Hardware Cost 0.58 4.216 0.57 0.066 0.58 0.065 0.60 0.066 - - - 0.60 - 7,256,176 - 4.216 - 117,353 - 0.066 - 112,356 - 0.065 - 110,367 - 0.066 - - - - 110,367 - 0.066 0.066 - - 4.216 - - 0.066 - - 0.065 - - 0.066 - - - - - 0.066 Support - Production Engineering Cost Production Engineering - - 0.052 - - 0.005 - - 0.007 - - 0.009 - - - - - 0.009 Subtotal: Support Production Engineering Cost - - 0.052 - - 0.005 - - 0.007 - - 0.009 - - - - - 0.009 Gross/Weapon System Cost - - 4.270 - - 0.071 - - 0.073 - - 0.075 - - - - - 0.075 (†) indicates the presence of a P-5a LI 1450EA3000 - CTG, Handgun, All Types Army UNCLASSIFIED Page 6 of 9 P-1 Line #4 Volume 1 - 147 === page 180 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements Complete Round Complete Round Complete Round O O C P-1 Line Item Number / Title: 1450EA3000 / CTG, Handgun, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 CANADIAN COMMERCIAL CORP / OTTAWA, CANADA Option / FFP PICATINNY ARSENAL, NJ Jun 2025 Jan 2026 117,353 0.56 Y 2026 CANADIAN COMMERCIAL CORP / OTTAWA, CANADA Option / FFP PICATINNY ARSENAL, NJ Jun 2026 Jan 2027 112,356 0.58 Y 2027 CANADIAN COMMERCIAL CORP / OTTAWA, CANADA Option / FFP PICATINNY ARSENAL, NJ Jun 2027 Jun 2028 110,367 0.60 Y LI 1450EA3000 - CTG, Handgun, All Types Army Location of PCO Item Number / Title [DODIC]: E96105 / CTG, 9mm Marking, M1041 (Blue) [AC36] UNCLASSIFIED Page 7 of 9 P-1 Line #4 RFP Issue Date Volume 1 - 148 === page 181 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1450EA3000 / CTG, Handgun, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E96107 / CTG, 9mm Marking, M1041 (Red) [AC37] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 2.822 0.067 0.068 0.069 - 0.069 - - - - - - 2.822 0.067 0.068 0.069 - 0.069 - - - - - - 2.822 0.067 0.068 0.069 - 0.069 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Qty ($) FY 2025 Total Cost (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Complete Round (†) Subtotal: Recurring Cost Subtotal: Hardware Cost 0.59 2.680 0.57 0.063 0.58 0.061 0.60 0.062 - - - 0.60 - 4,581,855 - 2.680 - 110,708 - 0.063 - 104,661 - 0.061 - 102,909 - 0.062 - - - - 102,909 - 0.062 0.062 - - 2.680 - - 0.063 - - 0.061 - - 0.062 - - - - - 0.062 Support - Production Engineering Cost Production Engineering - - 0.142 - - 0.004 - - 0.006 - - 0.007 - - - - - 0.007 Subtotal: Support Production Engineering Cost - - 0.142 - - 0.004 - - 0.006 - - 0.007 - - - - - 0.007 Gross/Weapon System Cost - - 2.822 - - 0.067 - - 0.068 - - 0.069 - - - - - 0.069 (†) indicates the presence of a P-5a LI 1450EA3000 - CTG, Handgun, All Types Army UNCLASSIFIED Page 8 of 9 P-1 Line #4 Volume 1 - 149 === page 182 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements Complete Round Complete Round Complete Round O O C P-1 Line Item Number / Title: 1450EA3000 / CTG, Handgun, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 CANADIAN COMMERCIAL CORP / OTTAWA, CANADA Option / FFP PICATINNY ARSENAL, NJ Jun 2025 Jan 2026 110,708 0.56 Y 2026 CANADIAN COMMERCIAL CORP / OTTAWA, CANADA Option / FFP PICATINNY ARSENAL, NJ Jun 2026 Jan 2027 104,661 0.58 Y 2027 CANADIAN COMMERCIAL CORP / OTTAWA, CANADA Option / FFP PICATINNY ARSENAL, NJ Jun 2027 Jun 2028 102,909 0.60 Y LI 1450EA3000 - CTG, Handgun, All Types Army Location of PCO Item Number / Title [DODIC]: E96107 / CTG, 9mm Marking, M1041 (Red) [AC37] UNCLASSIFIED Page 9 of 9 P-1 Line #4 RFP Issue Date Volume 1 - 150 === page 183 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 2,625.215 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 2,625.215 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 2,625.215 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 95.241 57.049 50.861 - 50.861 65.278 68.408 87.188 87.537 - - - - - - - - - - - 95.241 57.049 50.861 - 50.861 65.278 68.408 87.188 87.537 - - - - - - - - - - - 95.241 57.049 50.861 - 50.861 65.278 68.408 87.188 87.537 - Total 3,136.777 3,136.777 3,136.777 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line includes .50 CAL ALL TYPES. (E07100) CTG .50 Caliber Cartridge Ball M33 is linked in 100-cartridge belts with the M9 link, for use in the M2, M2A1, and M3 Machine Gun. M33 is identified with a plain bullet tip. This item is Code A, approved for service use. (E07200) CTG .50 Caliber Cartridge, Ball M33 and Cartridge, Tracer M17 linked 4 to 1 in a 100-cartridge belt with the M9 link for use in M2, M2A1, and M3 Machine Gun against unarmored targets. The tracer cartridge permits observation of the bullet's trajectory to the point of impact. M17 is identified with a brown bullet tip. M33 is identified with a plain bullet tip. This item is Code A, approved for service use. (E07302) CTG .50 Caliber Blank Cartridge, M1A1 linked in a 100-cartridge belt with the M9 link for use in the M2 and M2A1 Machine Gun. This cartridge is a blank cartridge with a rosette crimp at the mouth used to simulate firing in training exercises in conjunction with the M19 Blank Firing Attachment (BFA). This item is Code A, approved for service use. (E07307) .50 Caliber Reduced Range Cartridges, XM1181/XM1199, are issued in a 100 cartridge belt with the M9 link for use in the M2 machine gun family. These cartridges are conventional small-caliber munitions with a newly designed projectile used for live fire training on ranges with reduced Surface Danger Zones (SDZ). They are intended for training use only and are not suitable for combat. These items are Code B, not approved for service use. (F88000) .50 Caliber Saboted Light Armor Penetrator (SLAP), M903 cartridge consists of a low-drag, tungsten-alloy penetrator encased in a lightweight plastic sabot loaded into otherwise conventional Caliber .50 cartridge components. The projectile assembly is launched at high velocity and the sabot is discarded shortly after muzzle exit. The companion M962 SLAP-Tracer cartridge is similar in configuration to the M903 except that the penetrator has a cavity containing tracer mix. The M962 provides the precision of delivery necessary to take full advantage of the penetrator cartridge capability. This ammunition is linked to four M903 SLAP to one M962 tracer for use in the M2 Heavy Barrel Machine Gun. The SLAP is used in combat against current and future light armored targets and Armored Attack Helicopters (AAHs). The M903 provides the M2 Machine Gun with a more effective capability against improved armored vehicles increasing penetration of light armor by a factor of two to three times at any given range over that of currently available ammunition. The item is Code A, approved for service use. LI 1722E08000 - CTG, .50 Cal, All Types Army UNCLASSIFIED Page 1 of 32 P-1 Line #5 Volume 1 - 151 === page 184 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD P-5 E07100 / CTG, .50cal Ball, M2 w/ M33 Link [A555] P-5a A P-5 E07200 / CTG, .50cal 4 Ball M33 / 1 Tracer M17 w/M9 Link [A557] P-5a, P-21 A P-5 E07302 / CTG, .50cal Blank, M1A1 w/M9 Link [A598] P-5a, P-21 A P-5 E07307 / CTG, .50CAL REDUCE RANGE AMMUNITION (RRA) P-5a, P-21 B P-5 F88000 / CTG, .50cal 4 SLAP M903 / 1 SLAP-T M962, w/M9 Link [A518] P-5a, P-21 A P-40 Total Gross/Weapon System Cost MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 311.731 - / 4.144 - / 4.221 - / 4.336 - / - - / 4.336 / 1,692.553 - / 53.966 - / 20.846 - / 21.532 - / - - / 21.532 - / 148.039 - / 5.886 - / 5.987 - / 6.151 - / - - / 6.151 - / 107.912 - / 5.412 - / 13.673 - / 5.379 - / - - / 5.379 / 364.980 - / 25.833 - / 12.322 - / 13.463 - / - - / 13.463 / 2,625.215 - / 95.241 - / 57.049 - / 50.861 - / - - / 50.861 - - *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 base budget supports critical Army Title 10 war reserve/operational, training, and test requirements in accordance with DoDI 3000.04 (Munitions Requirements Process) and AR 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War (OSW)-approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life-cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. FY 2027 Budget supports the Minimum Sustaining Rates at Lake City Army Ammunition Plant (LCAAP) as well as Second Source Facility. FY 2027 Total dollars in the amount of $50.861 million support procurement of 10.923 million rounds. The Army intends to convert any price advantage created through contract negotiations, other service procurement, and/or Foreign Military Sales (FMS) to increase procurement of .50 CAL ALL TYPES when possible. (E07100) CTG .50 Caliber Cartridge Ball M33 is linked in 100 round belts with the M9 link. This is a training standard item used in training and combat. The FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $4.336 million supports the procurement of 1.408 million .50 Caliber Cartridge Ball M33 Cartridges. Type classification date: 1951 (E07200) CTG .50 Caliber Cartridge, Ball M33 and Cartridge, Tracer M17 linked 4 to 1 in a 100-round belt with the M9 link. This is a training standard item used in training and combat. The FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $21.532 million supports the procurement of 6.052 million M33 .50 Caliber Ball Cartridges linked with M17 Tracer Cartridges. Type classification date: 1968 (E07302) CTG .50 Caliber Blank Cartridge, M1A1 linked with the M9 link. This is a training unique item not used in combat. The FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $6.151 million supports the procurement of 2.467 million .50 Caliber Blank Cartridge, M1A1 Cartridges. Type classification date: 1980 LI 1722E08000 - CTG, .50 Cal, All Types Army UNCLASSIFIED Page 2 of 32 P-1 Line #5 Volume 1 - 152 === page 185 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A (E07307).50 Caliber Reduced Range Cartridges - These are training unique items, not used in combat. The FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $5.379 million supports the procurement of 0.519 million .50 Caliber Reduced Range Cartridges. Type classification date: 2026 (F88000) .50 Caliber Saboted Light Armor Penetrator (SLAP), M903 Cartridge Tracer M962 linked 4 to 1 in a 100-round belt with the M9 link. This is a war reserve item used in combat. The FY 2027 request builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $13.463 million supports the procurement of 0.477 million Cartridges. Type classification date: March 1993 LI 1722E08000 - CTG, .50 Cal, All Types Army UNCLASSIFIED Page 3 of 32 P-1 Line #5 Volume 1 - 153 === page 186 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E07100 / CTG, .50cal Ball, M2 w/ M33 Link [A555] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 4.144 4.221 4.336 - 4.336 - Gross/Weapon System Cost ($ in Millions) 311.731 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 311.731 Plus CY Advance Procurement ($ in Millions) - - - - - 4.144 4.221 4.336 - 4.336 - Total Obligation Authority ($ in Millions) 311.731 FY 2027 Total - - - - - 4.144 4.221 4.336 - 4.336 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Qty ($) FY 2025 Total Cost (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 26.14 Subtotal: Recurring Cost - Production Engineering Subtotal: Support Production Engineering Cost ROUND Subtotal: Hardware Cost 11,814,860 308.876 2.78 - 308.876 - - 308.876 - - - 2.850 - - 1,343,853 3.736 2.67 - 3.736 - - 3.736 - - - 0.408 2.850 - - 1,410,551 3.766 2.68 - 3.766 - - 3.766 - - - 0.452 0.408 - - 1,408,001 3.773 - - - 2.68 1,408,001 3.773 - 3.773 - - - - - 3.773 - 3.773 - - - - - 3.773 - - 0.558 - - - - - 0.558 0.452 - - 0.558 - - - - - 0.558 Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.005 - - - - - 0.003 - - 0.004 - - - - - 0.004 Subtotal: Support - Quality Assurance Cost - - 0.005 - - - - - 0.003 - - 0.004 - - - - - 0.004 Gross/Weapon System Cost - - 311.731 - - 4.144 - - 4.221 - - 4.336 - - - - - 4.336 (†) indicates the presence of a P-5a LI 1722E08000 - CTG, .50 Cal, All Types Army UNCLASSIFIED Page 4 of 32 P-1 Line #5 Volume 1 - 154 === page 187 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements O O C COMPLETE ROUND COMPLETE ROUND COMPLETE ROUND COMPLETE ROUND ✓ P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Sep 2025 Sep 2026 1,343,853 2.78 Y 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 1,342,012 2.67 Y 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 68,539 2.67 Y 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 1,408,001 2.68 Y LI 1722E08000 - CTG, .50 Cal, All Types Army Location of PCO Item Number / Title [DODIC]: E07100 / CTG, .50cal Ball, M2 w/ M33 Link [A555] UNCLASSIFIED Page 5 of 32 P-1 Line #5 RFP Issue Date Volume 1 - 155 === page 188 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E07200 / CTG, .50cal 4 Ball M33 / 1 Tracer M17 w/M9 Link [A557] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 53.966 20.846 21.532 - 21.532 - Gross/Weapon System Cost ($ in Millions) 1,692.553 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 1,692.553 Plus CY Advance Procurement ($ in Millions) - - - - - 53.966 20.846 21.532 - 21.532 - Total Obligation Authority ($ in Millions) 1,692.553 FY 2027 Total - - - - - 53.966 20.846 21.532 - 21.532 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Qty Total Cost 633,483K 1,666.060 2.96 (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 2.63 51.289 2.96 Subtotal: Recurring Cost - - 1,666.060 - - - 1,666.060 - - 51.289 - - 51.289 - Acceptance Test - - 0.230 Subtotal: Support Acceptance Testing Cost - - - - - 0.230 - - Value Engineering - Subtotal: Support - NonRecurring Support Cost - - 11.121 - - 11.121 - Production Engineering Subtotal: Support Production Engineering Cost - - 14.999 - - 14.999 Quality Assurance - - Subtotal: Support - Quality Assurance Cost - - ROUND Subtotal: Hardware Cost 17,327,393 6,128,762 18.141 3.02 - 18.141 - - 18.141 - - - 0.099 - - - - - - - - - - - 2.670 - - 2.670 0.143 - - 0.143 - - 6,052,016 18.277 - - - 3.02 6,052,016 18.277 - 18.277 - - - - - 18.277 - 18.277 - - - - - 18.277 - - 0.096 - - - - - 0.096 0.099 - - 0.096 - - - - - 0.096 - 0.492 - - 0.504 - - - - - 0.504 - 0.492 - - 0.504 - - - - - 0.504 - - 2.109 - - 2.650 - - - - - 2.650 - - 2.109 - - 2.650 - - - - - 2.650 0.007 - - 0.005 - - 0.005 - - - - - 0.005 0.007 - - 0.005 - - 0.005 - - - - - 0.005 Support - Acceptance Testing Cost Support - Non-Recurring Support Cost Support - Production Engineering Cost Support - Quality Assurance Cost LI 1722E08000 - CTG, .50 Cal, All Types Army UNCLASSIFIED Page 6 of 32 P-1 Line #5 Volume 1 - 156 === page 189 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E07200 / CTG, .50cal 4 Ball M33 / 1 Tracer M17 w/M9 Link [A557] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Gross/Weapon System Cost Unit Cost ($) - FY 2025 Total Cost Qty (Each) ($ M) - 1,692.553 Unit Cost ($) - FY 2026 Total Cost Qty (Each) ($ M) - 53.966 Unit Cost ($) - FY 2027 Base Total Cost Qty (Each) ($ M) - 20.846 Unit Cost ($) - FY 2027 OOC Total Cost Qty (Each) ($ M) - Unit Cost ($) 21.532 - FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) - ($) - - Total Cost Qty (Each) ($ M) - 21.532 Remarks: FY 2026 to FY 2027 unit cost includes full Economic Price Adjustments due to increases in commodity prices. (†) indicates the presence of a P-5a LI 1722E08000 - CTG, .50 Cal, All Types Army UNCLASSIFIED Page 7 of 32 P-1 Line #5 Volume 1 - 157 === page 190 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E07200 / CTG, .50cal 4 Ball M33 / 1 Tracer M17 w/M9 Link [A557] Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Sep 2025 Sep 2026 15,594,654 2.96 Y 2025 OLIN CORPORATION WINCHESTER / OXFORD, MS Option / FFP ROCK ISLAND ARSENAL, IL Sep 2025 Sep 2026 1,732,739 2.96 Y 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 5,515,886 2.96 Y 2026 OLIN CORPORATION WINCHESTER / OXFORD, MS Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 612,876 2.96 Y 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 5,446,814 3.02 Y 2027 TO BE SELECTED / TO BE SELECTED Option / FFP TBS Mar 2027 Mar 2028 605,202 3.02 Y RFP Issue Date indicates the presence of a P-21 Remarks: Price differences FY 2025 through FY 2027 are due to step ladder pricing matrices based on quantity ranges, as well as negotiated Economic Price Adjustments (EPA), and decisions to change the percentage executed between competing vendors determined during execution. LI 1722E08000 - CTG, .50 Cal, All Types Army UNCLASSIFIED Page 8 of 32 P-1 Line #5 Volume 1 - 158 === page 191 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E07200 / CTG, .50cal 4 Ball M33 / 1 Tracer M17 w/M9 Link [A557] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R S E P B A L A N C E .089 .708 Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G COMPLETE ROUND Prior Years Deliveries: 633482885 1 2025 AF (‡) 1.062 .000 1.062 A - - - - - - - - - .089 .089 .089 1 2025 ARMY 15.595 .000 15.595 A - - - - - - - - - - - - 1 2025 CG (‡) .068 .000 .068 A - - - - - - - - - .006 .006 .006 .006 .045 2.947 .000 2.947 A - - - - - - - - - .246 .246 .246 .246 1.965 .075 .000 .075 A - - - - - - - - - .006 .006 .006 .006 .050 .000 19.746 - - - - - - - - - .346 .346 .346 1.646 17.063 NAVSEA 1.300 14.295 1 2025 1 2025 NSOF 1 2025 Total 2 2025 AF (‡) .170 .000 .170 A - - - - - - - - - .014 .014 .014 .014 .113 2 2025 ARMY 1.733 .000 1.733 A - - - - - - - - - - - - .144 1.588 2 2025 CG (‡) .011 .000 .011 A - - - - - - - - - * * * * .008 .471 .000 .471 A - - - - - - - - - .039 .039 .039 .039 .314 (‡) (‡) 19.746 NAVSEA 2 2025 2 2025 NSOF .013 .000 .013 A - - - - - - - - - .001 .001 .001 .001 .008 2 2025 Total 2.398 .000 2.398 - - - - - - - - - .055 .055 .055 .200 2.032 1 2026 AF (‡) 1.278 .000 1.278 A - - - - - - - 1.278 1 2026 ARMY 5.516 .000 5.516 A - - - - - - - 5.516 3.251 .000 3.251 A - - - - - - - 3.251 .266 .000 .266 A - - - - - - - .266 .000 10.311 - - - - - - - 10.311 A - - - - - - - (‡) (‡) NAVSEA 1 2026 1 2026 NSOF 1 2026 Total 2 2026 ARMY .613 .000 .613 1 2027 AF (‡) 1.086 .000 1.086 1.086 1 2027 ARMY 5.447 .000 5.447 5.447 1 2027 CG (‡) .068 .000 .068 .068 3.073 .000 3.073 3.073 .814 .000 .814 .814 .000 10.488 10.488 (‡) (‡) 10.311 NAVSEA 1 2027 1 2027 NSOF 1 2027 Total (‡) (‡) 10.488 O C T LI 1722E08000 - CTG, .50 Cal, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 32 S E P O C T N O V D E C J A N F E B P-1 Line #5 M A R A P R M A Y J U N J U L A U G .613 S E P Volume 1 - 159 === page 192 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C Item Number / Title [DODIC]: E07200 / CTG, .50cal 4 Ball M33 / 1 Tracer M17 w/M9 Link [A557] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Fiscal Year 2026 Calendar Year 2025 Calendar Year 2026 B A L A N C E M F R # FY SERVICE 3 2027 AF (‡) .121 .000 .121 .121 3 2027 ARMY .605 .000 .605 .605 3 2027 CG (‡) .008 .000 .008 .008 .341 .000 .341 .341 .090 .000 .090 .090 1.165 .000 1.165 1.165 NAVSEA 3 2027 3 2027 NSOF 3 2027 Total (‡) (‡) PROC QTY O C T O C T LI 1722E08000 - CTG, .50 Cal, All Types Army N O V N O V D E C D E C J A N J A N F E B F E B M A R M A R A P R A P R M A Y M A Y J U N J U N J U L J U L A U G A U G UNCLASSIFIED Page 10 of 32 S E P S E P O C T O C T N O V N O V D E C D E C J A N J A N F E B F E B P-1 Line #5 M A R M A R A P R A P R M A Y M A Y J U N J U N J U L J U L A U G A U G S E P S E P Volume 1 - 160 === page 193 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E07200 / CTG, .50cal 4 Ball M33 / 1 Tracer M17 w/M9 Link [A557] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 633482885 1 2025 AF (‡) 1.062 .354 .708 .089 .089 .089 .089 .089 .089 .089 .089 - - - .000 1 2025 ARMY 15.595 1.300 14.295 1.300 1.300 1.300 1.300 1.300 1.300 1.300 1.300 1.300 1.300 1.300 .000 1 2025 CG (‡) .068 .023 .045 .006 .006 .006 .006 .006 .006 .006 .006 - - - .000 2.947 .982 1.965 .246 .246 .246 .246 .246 .246 .246 .246 - - - .000 .025 NAVSEA 1 2025 1 2025 NSOF 1 2025 Total 19.746 2 2025 AF (‡) 2 2025 2 2025 (‡) (‡) .050 .006 .006 .006 .006 .006 .006 .006 .006 - - - 2.683 17.063 1.646 1.646 1.646 1.646 1.646 1.646 1.646 1.646 1.300 1.300 1.300 .170 .057 .113 .014 .014 .014 .014 .014 .014 .014 .014 - - - .000 ARMY 1.733 .144 1.588 .144 .144 .144 .144 .144 .144 .144 .144 .144 .144 .144 .000 (‡) .011 .004 .008 * * * * * * * * - - - .000 .471 .157 .314 .039 .039 .039 .039 .039 .039 .039 .039 - - - .000 CG NAVSEA .075 .000 - - - - - - - - - - - - - .000 2 2025 2 2025 NSOF .013 .004 .008 .001 .001 .001 .001 .001 .001 .001 .001 - - - 2 2025 Total 2.398 .366 2.032 .200 .200 .200 .200 .200 .200 .200 .200 .144 .144 .144 - - - - - - 1 2026 AF (‡) 1.278 .000 1.278 - - - - - .107 .107 .107 .107 .107 .107 .107 .107 .107 .107 .107 .107 .000 1 2026 ARMY 5.516 .000 5.516 - - - - - .460 .460 .460 .460 .460 .460 .460 .460 .460 .460 .460 .460 .000 3.251 .000 3.251 - - - - - .271 .271 .271 .271 .271 .271 .271 .271 .271 .271 .271 .271 .000 .266 .000 (‡) (‡) NAVSEA 1 2026 1 2026 NSOF 1 2026 Total 10.311 2 2026 ARMY 1 2027 AF 1 1 (‡) (‡) .000 .266 - - - - - .022 .022 .022 .022 .022 .022 .022 .022 .022 .022 .022 .022 .000 10.311 - - - - - .859 .859 .859 .859 .859 .859 .859 .859 .859 .859 .859 .859 .613 .000 .613 - - - - - .052 .052 .052 .052 .052 .052 .052 .052 .052 .052 .052 .042 (‡) 1.086 .000 1.086 A - - - - - - - - - - - 2027 ARMY 5.447 .000 5.447 A - - - - - - - - - - 2027 CG (‡) .068 .000 .068 A - - - - - - - - - 3.073 .000 3.073 A - - - - - - - - .814 .000 .814 A - - - - - - - .000 10.488 - - - - - - - NAVSEA 1 2027 1 2027 NSOF 1 2027 Total (‡) (‡) 10.488 O C T LI 1722E08000 - CTG, .50 Cal, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 32 S E P O C T - - - - - - - .000 .000 - - - - - - - - .090 .090 .090 .090 .090 .090 .090 .452 - - .454 .454 .454 .454 .454 .454 .454 2.270 - - - .006 .006 .006 .006 .006 .006 .006 .028 - - - - .256 .256 .256 .256 .256 .256 .256 1.281 - - - - - .068 .068 .068 .068 .068 .068 .068 .339 - - - - - .874 .874 .874 .874 .874 .874 .874 4.370 M A R A P R M A Y J U N J U L A U G S E P N O V D E C J A N F E B P-1 Line #5 .000 .000 Volume 1 - 161 === page 194 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C Item Number / Title [DODIC]: E07200 / CTG, .50cal 4 Ball M33 / 1 Tracer M17 w/M9 Link [A557] M A R A P R M A Y J U N J U L A U G S E P B A L A N C E - .010 .010 .010 .010 .010 .010 .010 .050 - .050 .050 .050 .050 .050 .050 .050 .252 - - * * * * * * * .003 - - - .028 .028 .028 .028 .028 .028 .028 .142 - - - - .008 .008 .008 .008 .008 .008 .008 .038 - - - - .097 .097 .097 .097 .097 .097 .097 .486 M A R A P R M A Y J U N J U L A U G S E P Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 Calendar Year 2028 M F R # FY SERVICE 3 2027 AF (‡) .121 .000 .121 A - - - - - - - - - - - 3 2027 ARMY .605 .000 .605 A - - - - - - - - - - - 3 2027 CG (‡) .008 .000 .008 A - - - - - - - - - - .341 .000 .341 A - - - - - - - - - .090 .000 .090 A - - - - - - - - 1.165 .000 1.165 - - - - - - - - NAVSEA 3 2027 3 2027 NSOF 3 2027 Total (‡) (‡) PROC QTY O C T O C T LI 1722E08000 - CTG, .50 Cal, All Types Army N O V N O V D E C D E C J A N J A N F E B F E B M A R M A R A P R A P R M A Y M A Y J U N J U N J U L J U L A U G S E P A U G UNCLASSIFIED Page 12 of 32 S E P O C T O C T N O V N O V D E C D E C J A N J A N F E B F E B P-1 Line #5 Volume 1 - 162 === page 195 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E07200 / CTG, .50cal 4 Ball M33 / 1 Tracer M17 w/M9 Link [A557] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 633482885 1 2025 AF (‡) 1.062 1.062 .000 .000 1 2025 ARMY 15.595 15.595 .000 .000 1 2025 CG (‡) .068 .068 .000 .000 2.947 2.947 .000 .000 NAVSEA 1 2025 1 2025 NSOF .075 .075 .000 1 2025 Total 19.746 19.746 .000 2 2025 AF (‡) .170 .170 .000 .000 2 2025 ARMY 1.733 1.733 .000 .000 2 2025 (‡) .011 .011 .000 .000 .471 .471 .000 .000 (‡) CG (‡) NAVSEA .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 2 2025 2 2025 NSOF .013 .013 .000 2 2025 Total 2.398 2.398 .000 1 2026 AF (‡) 1.278 1.278 .000 .000 1 2026 ARMY 5.516 5.516 .000 .000 3.251 3.251 .000 .000 (‡) (‡) NAVSEA 1 2026 1 2026 NSOF .266 .266 .000 1 2026 Total 10.311 10.311 .000 2 2026 ARMY .613 .613 .000 1 2027 AF (‡) 1.086 .633 1 2027 ARMY 5.447 1 2027 CG (‡) (‡) (‡) NAVSEA 1 2027 1 2027 NSOF 1 2027 Total (‡) (‡) .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 .452 .090 .090 .090 .090 .090 .000 3.177 2.270 .454 .454 .454 .454 .454 .000 .068 .040 .028 .006 .006 .006 .006 .006 .000 3.073 1.793 1.281 .256 .256 .256 .256 .256 .000 .000 .814 .475 .339 .068 .068 .068 .068 .068 10.488 6.118 4.370 .874 .874 .874 .874 .874 O C T N O V D E C J A N F E B LI 1722E08000 - CTG, .50 Cal, All Types Army .000 M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 32 S E P O C T N O V D E C J A N F E B P-1 Line #5 M A R A P R M A Y J U N J U L A U G - .000 S E P Volume 1 - 163 === page 196 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT M F R # FY SERVICE 3 2027 AF (‡) .121 .070 3 2027 ARMY .605 .353 3 2027 CG (‡) .008 NAVSEA 3 2027 3 2027 NSOF 3 2027 Total (‡) (‡) Item Number / Title [DODIC]: E07200 / CTG, .50cal 4 Ball M33 / 1 Tracer M17 w/M9 Link [A557] Calendar Year 2029 N O V D E C J A N F E B .050 .010 .010 .010 .010 .010 .000 .252 .050 .050 .050 .050 .050 .000 .004 .003 * * * * * .000 .341 .199 .142 .028 .028 .028 .028 .028 .000 .090 .053 .038 .008 .008 .008 .008 .008 1.165 .680 .486 .097 .097 .097 .097 .097 O C T N O V D E C J A N F E B LI 1722E08000 - CTG, .50 Cal, All Types Army A P R M A Y J U N J U L Calendar Year 2030 O C T PROC QTY M A R B A L A N C E Fiscal Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P .000 M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 32 S E P O C T N O V D E C J A N F E B P-1 Line #5 M A R A P R M A Y J U N J U L A U G - .000 S E P Volume 1 - 164 === page 197 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E07200 / CTG, .50cal 4 Ball M33 / 1 Tracer M17 w/M9 Link [A557] Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 OLIN WINCHESTER, LLC LCAAP - INDEPENDENCE, MO 584,000 750,000 3,934,000 6 6 12 18 6 6 12 18 2 OLIN CORPORATION WINCHESTER - OXFORD, MS 450,000 450,000 1,666,667 6 6 12 18 6 6 12 18 3 TO BE SELECTED - TO BE SELECTED 400,000 400,000 1,600,000 6 6 12 18 6 6 12 18 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1722E08000 - CTG, .50 Cal, All Types Army UNCLASSIFIED Page 15 of 32 P-1 Line #5 Volume 1 - 165 === page 198 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E07302 / CTG, .50cal Blank, M1A1 w/M9 Link [A598] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 5.886 5.987 6.151 - 6.151 - Gross/Weapon System Cost ($ in Millions) 148.039 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 148.039 Plus CY Advance Procurement ($ in Millions) - - - - - 5.886 5.987 6.151 - 6.151 - Total Obligation Authority ($ in Millions) 148.039 FY 2027 Total - - - - - 5.886 5.987 6.151 - 6.151 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost (†) 142.656 2.02 5.164 2.06 5.242 2.10 5.182 - - - 2.10 - - 142.656 - - 5.164 - - 5.242 - - 5.182 - - - - - 5.182 - - 142.656 - - 5.164 - - 5.242 - - 5.182 - - - - - 5.182 Production Engineering - - 5.440 - - 0.710 - - 0.737 - - 0.960 - - - - - 0.960 Subtotal: Support Production Engineering Cost - - 5.440 - - 0.710 - - 0.737 - - 0.960 - - - - - 0.960 Complete Round Subtotal: Recurring Cost Subtotal: Hardware Cost 1.09 130,398K 2,556,577 2,544,796 2,467,416 2,467,416 5.182 Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.032 - - 0.008 - - 0.008 - - 0.010 - - - - - 0.010 Subtotal: Support - Quality Assurance Cost - - 0.032 - - 0.008 - - 0.008 - - 0.010 - - - - - 0.010 Gross/Weapon System Cost - - 148.039 - - 5.886 - - 5.987 - - 6.151 - - - - - 6.151 Remarks: FY 2026 and FY 2027 unit cost includes full Economic Price Adjustments due to increases in commodity prices. (†) indicates the presence of a P-5a LI 1722E08000 - CTG, .50 Cal, All Types Army UNCLASSIFIED Page 16 of 32 P-1 Line #5 Volume 1 - 166 === page 199 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (†) Complete Round (†) Complete Round (†) Complete Round (†) O O C P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E07302 / CTG, .50cal Blank, M1A1 w/M9 Link [A598] Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Sep 2025 Sep 2026 2,556,577 2.02 Y 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 2,544,796 2.06 Y 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 2,467,416 2.10 Y RFP Issue Date indicates the presence of a P-21 LI 1722E08000 - CTG, .50 Cal, All Types Army UNCLASSIFIED Page 17 of 32 P-1 Line #5 Volume 1 - 167 === page 200 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E07302 / CTG, .50cal Blank, M1A1 w/M9 Link [A598] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R S E P B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G Complete Round Prior Years Deliveries: 130398275 1 1 2025 2025 ARMY NAVSEA (‡) (‡) 2.557 .000 2.557 A - - - - - - - - - - - - .213 2.344 .169 .000 .169 A - - - - - - - - - .014 .014 .014 .014 .113 1 2025 NSOF .364 .000 .364 A - - - - - - - - - .030 .030 .030 .030 .243 1 2025 Total 3.089 .000 3.089 - - - - - - - - - .044 .044 .044 .257 2.699 1 2026 ARMY 2.545 .000 2.545 A - - - - - - - 2.545 1 2026 .171 .000 .171 A - - - - - - - .171 1 2026 NSOF .458 .000 .458 A - - - - - - - .458 1 2026 Total 3.173 .000 3.173 - - - - - - - 3.173 1 2027 ARMY 2.467 .000 2.467 NAVSEA (‡) (‡) 2.467 O C T LI 1722E08000 - CTG, .50 Cal, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 18 of 32 S E P O C T N O V D E C J A N F E B P-1 Line #5 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 168 === page 201 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E07302 / CTG, .50cal Blank, M1A1 w/M9 Link [A598] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT B A L A N C E Fiscal Year 2028 Calendar Year 2027 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Complete Round Prior Years Deliveries: 130398275 1 1 2025 2025 ARMY NAVSEA (‡) (‡) 2.557 .213 2.344 .213 .213 .213 .213 .213 .213 .213 .213 .213 .213 .213 .000 .169 .056 .113 .014 .014 .014 .014 .014 .014 .014 .014 - - - .000 1 2025 NSOF .364 .121 .243 .030 .030 .030 .030 .030 .030 .030 .030 - - - 1 2025 Total 3.089 .391 2.699 .257 .257 .257 .257 .257 .257 .257 .257 .213 .213 .213 - - - - - - 1 2026 ARMY 2.545 .000 2.545 - - - - - .212 .212 .212 .212 .212 .212 .212 .212 .212 .212 .212 .212 .000 1 2026 .171 .000 .171 - - - - - .014 .014 .014 .014 .014 .014 .014 .014 .014 .014 .014 .014 .000 1 2026 NSOF .458 .000 .458 - - - - - .038 .038 .038 .038 .038 .038 .038 .038 .038 .038 .038 .038 1 2026 Total 3.173 .000 3.173 - - - - - .264 .264 .264 .264 .264 .264 .264 .264 .264 .264 .264 .264 - - - - - - - .000 1 2027 ARMY 2.467 .000 2.467 A - - - - - - - - - - - - .206 .206 .206 .206 .206 .206 .206 1.028 M A R A P R M A Y J U N J U L A U G S E P NAVSEA (‡) (‡) O C T LI 1722E08000 - CTG, .50 Cal, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 19 of 32 .000 S E P O C T N O V D E C J A N F E B P-1 Line #5 - - - - - - - .000 .000 Volume 1 - 169 === page 202 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E07302 / CTG, .50cal Blank, M1A1 w/M9 Link [A598] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Complete Round Prior Years Deliveries: 130398275 1 1 2025 2025 ARMY NAVSEA (‡) (‡) 2.557 2.557 .000 .000 .169 .169 .000 .000 1 2025 NSOF .364 .364 .000 1 2025 Total 3.089 3.089 .000 1 2026 ARMY 2.545 2.545 .000 .000 1 2026 .171 .171 .000 .000 1 2026 NSOF .458 .458 .000 1 2026 Total 3.173 3.173 .000 - - - - - 1 2027 ARMY 2.467 1.439 1.028 .206 .206 .206 .206 .206 O C T N O V D E C J A N F E B NAVSEA (‡) (‡) .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 .000 LI 1722E08000 - CTG, .50 Cal, All Types Army - - - - - - - - - - - - - - - - - - - .000 .000 M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 20 of 32 S E P O C T N O V D E C J A N F E B P-1 Line #5 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 170 === page 203 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E07302 / CTG, .50cal Blank, M1A1 w/M9 Link [A598] Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 OLIN WINCHESTER, LLC LCAAP - INDEPENDENCE, MO MSR For 2027 1-8-5 For 2027 MAX For 2027 150,000 187,500 5,000,000 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 6 12 Total After Oct 1 ALT Prior to Oct 1 18 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 12 18 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1722E08000 - CTG, .50 Cal, All Types Army UNCLASSIFIED Page 21 of 32 P-1 Line #5 Volume 1 - 171 === page 204 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E07307 / CTG, .50CAL REDUCE RANGE AMMUNITION (RRA) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 5.412 13.673 5.379 - 5.379 - Gross/Weapon System Cost ($ in Millions) 107.912 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 107.912 Plus CY Advance Procurement ($ in Millions) - - - - - 5.412 13.673 5.379 - 5.379 - Total Obligation Authority ($ in Millions) 107.912 FY 2027 Total - - - - - 5.412 13.673 5.379 - 5.379 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Qty ($) FY 2025 Total Cost (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 7.97 Subtotal: Recurring Cost - ROUND Subtotal: Hardware Cost 13,533,689 107.864 9.88 - 107.864 - - 107.864 - 516,123 5.097 9.88 - 5.097 - - 5.097 - 1,177,579 11.630 9.90 - 11.630 - - 11.630 - 518,502 5.133 - - - 9.90 518,502 5.133 - 5.133 - - - - - 5.133 - 5.133 - - - - - 5.133 Support - Production Engineering Cost Production Engineering - - 0.048 - - 0.315 - - 2.043 - - 0.246 - - - - - 0.246 Subtotal: Support Production Engineering Cost - - 0.048 - - 0.315 - - 2.043 - - 0.246 - - - - - 0.246 Gross/Weapon System Cost - - 107.912 - - 5.412 - - 13.673 - - 5.379 - - - - - 5.379 (†) indicates the presence of a P-5a LI 1722E08000 - CTG, .50 Cal, All Types Army UNCLASSIFIED Page 22 of 32 P-1 Line #5 Volume 1 - 172 === page 205 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E07307 / CTG, .50CAL REDUCE RANGE AMMUNITION (RRA) Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 Canadian Commercial Corp / Ottawa, CA SS / FFP PICATINNY ARSENAL, NJ Mar 2026 Mar 2027 516,123 9.88 Y 2026 Canadian Commercial Corp / Ottawa, CA SS / FFP PICATINNY ARSENAL, NJ Mar 2026 Mar 2027 1,177,579 9.88 Y 2027 Canadian Commercial Corp / Ottawa, CA Option / FFP PICATINNY ARSENAL, NJ Mar 2027 Mar 2028 518,502 9.90 Y RFP Issue Date indicates the presence of a P-21 LI 1722E08000 - CTG, .50 Cal, All Types Army UNCLASSIFIED Page 23 of 32 P-1 Line #5 Volume 1 - 173 === page 206 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E07307 / CTG, .50CAL REDUCE RANGE AMMUNITION (RRA) Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Fiscal Year 2027 Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B COMPLETE ROUND Prior Years Deliveries: 13533689 1 2025 ARMY .516 .000 .516 A - - - - - - - - - - - - .043 .043 .043 .043 .043 .043 .043 .215 1 2026 ARMY 1.178 .000 1.178 A - - - - - - - - - - - - .098 .098 .098 .098 .098 .098 .098 .491 1 2027 ARMY .519 .000 .519 A - - - - - - - .519 O C T LI 1722E08000 - CTG, .50 Cal, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 24 of 32 S E P O C T N O V D E C J A N F E B P-1 Line #5 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 174 === page 207 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E07307 / CTG, .50CAL REDUCE RANGE AMMUNITION (RRA) Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND Prior Years Deliveries: 13533689 1 2025 ARMY .516 .301 .215 .043 .043 .043 .043 .043 1 2026 ARMY 1.178 .687 .491 .098 .098 .098 .098 .098 1 2027 ARMY .519 .000 .519 - - - - - O C T LI 1722E08000 - CTG, .50 Cal, All Types Army N O V D E C J A N F E B .000 .000 .043 .043 .043 .043 .043 .043 .043 .043 .043 .043 .043 .043 M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B UNCLASSIFIED Page 25 of 32 P-1 Line #5 .000 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 175 === page 208 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E07307 / CTG, .50CAL REDUCE RANGE AMMUNITION (RRA) Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Canadian Commercial Corp Ottawa, CA MSR For 2027 1-8-5 For 2027 MAX For 2027 400,000 1,500,000 30,000,000 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 6 12 Total After Oct 1 ALT Prior to Oct 1 18 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 12 18 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1722E08000 - CTG, .50 Cal, All Types Army UNCLASSIFIED Page 26 of 32 P-1 Line #5 Volume 1 - 176 === page 209 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: F88000 / CTG, .50cal 4 SLAP M903 / 1 SLAP-T M962, w/M9 Link [A518] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 25.833 12.322 13.463 - 13.463 - Gross/Weapon System Cost ($ in Millions) 364.980 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 364.980 Plus CY Advance Procurement ($ in Millions) - - - - - 25.833 12.322 13.463 - 13.463 - Total Obligation Authority ($ in Millions) 364.980 FY 2027 Total - - - - - 25.833 12.322 13.463 - 13.463 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost FY 2025 Total Cost Qty ($) (Each) (†) 114.15 3,183,520 Subtotal: Recurring Cost - Production Engineering Subtotal: Support Production Engineering Cost Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE ROUND Subtotal: Hardware Cost 363.396 23.74 - 363.396 - - 363.396 - - - 1.584 - - 1,056,707 25.088 26.06 - 25.088 - - 25.088 - - - 0.735 1.584 - - 448,372 11.685 26.59 - 11.685 - - 11.685 - - - 0.637 0.735 - - 477,427 12.695 - - - 26.59 477,427 12.695 - 12.695 - - - - - 12.695 - 12.695 - - - - - 12.695 - - 0.739 - - - - - 0.739 0.637 - - 0.739 - - - - - 0.739 Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - - - - 0.010 - - - - - 0.029 - - - - - 0.029 Subtotal: Support - Quality Assurance Cost - - - - - 0.010 - - - - - 0.029 - - - - - 0.029 Gross/Weapon System Cost - - - - 25.833 - - 12.322 - - 13.463 - - - - - 13.463 (†) 364.980 indicates the presence of a P-5a LI 1722E08000 - CTG, .50 Cal, All Types Army UNCLASSIFIED Page 27 of 32 P-1 Line #5 Volume 1 - 177 === page 210 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: F88000 / CTG, .50cal 4 SLAP M903 / 1 SLAP-T M962, w/M9 Link [A518] Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Sep 2025 Sep 2026 1,056,707 23.74 Y 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 448,372 26.06 Y 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 477,427 26.59 Y RFP Issue Date indicates the presence of a P-21 LI 1722E08000 - CTG, .50 Cal, All Types Army UNCLASSIFIED Page 28 of 32 P-1 Line #5 Volume 1 - 178 === page 211 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: F88000 / CTG, .50cal 4 SLAP M903 / 1 SLAP-T M962, w/M9 Link [A518] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R S E P B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G COMPLETE ROUND Prior Years Deliveries: 3183520 1 2025 ARMY 1.057 .000 1.057 A - - - - - - - - - - - - .088 .969 1 2025 MC (‡) .946 .000 .946 A - - - - - - - - - .079 .079 .079 .079 .631 1 2025 NSOF .099 .000 .099 A - - - - - - - - - .008 .008 .008 .008 .066 1 2025 Total 2.102 .000 2.102 - - - - - - - - - .087 .087 .087 .175 1.666 1 2026 ARMY .448 .000 .448 A - - - - - - - .448 1 2027 ARMY .477 .000 .477 (‡) .477 O C T LI 1722E08000 - CTG, .50 Cal, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 29 of 32 S E P O C T N O V D E C J A N F E B P-1 Line #5 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 179 === page 212 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: F88000 / CTG, .50cal 4 SLAP M903 / 1 SLAP-T M962, w/M9 Link [A518] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT B A L A N C E Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 3183520 1 2025 ARMY 1.057 .088 .969 .088 .088 .088 .088 .088 .088 .088 .088 .088 .088 .088 .000 1 2025 MC (‡) .946 .315 .631 .079 .079 .079 .079 .079 .079 .079 .079 - - - .000 1 2025 NSOF .099 .033 .066 .008 .008 .008 .008 .008 .008 .008 .008 - - - 1 2025 Total 2.102 .437 1.666 .175 .175 .175 .175 .175 .175 .175 .175 .088 .088 .088 - - - - - - 1 2026 ARMY .448 .000 .448 - - - - - .037 .037 .037 .037 .037 .037 .037 .037 .037 .037 .037 .037 1 2027 ARMY .477 .000 .477 A - - - - - - - - - - - - (‡) O C T LI 1722E08000 - CTG, .50 Cal, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 30 of 32 .000 S E P O C T N O V D E C J A N F E B P-1 Line #5 - - - - - - - .040 .040 .040 .040 .040 .040 .040 M A R A P R M A Y J U N J U L A U G S E P .000 .000 .199 Volume 1 - 180 === page 213 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: F88000 / CTG, .50cal 4 SLAP M903 / 1 SLAP-T M962, w/M9 Link [A518] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 3183520 1 2025 ARMY 1.057 1.057 .000 .000 1 2025 MC (‡) .946 .946 .000 .000 1 2025 NSOF .099 .099 .000 1 2025 Total 2.102 2.102 .000 1 2026 ARMY .448 .448 .000 1 2027 ARMY .477 .279 .199 (‡) .000 - - - - - .040 .040 .040 .040 .040 O C T N O V D E C J A N F E B - - - - - - - - - - - - - - - - - - - .000 .000 LI 1722E08000 - CTG, .50 Cal, All Types Army .000 M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 31 of 32 S E P O C T N O V D E C J A N F E B P-1 Line #5 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 181 === page 214 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1722E08000 / CTG, .50 Cal, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: F88000 / CTG, .50cal 4 SLAP M903 / 1 SLAP-T M962, w/M9 Link [A518] Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 OLIN WINCHESTER, LLC LCAAP - INDEPENDENCE, MO MSR For 2027 1-8-5 For 2027 MAX For 2027 20,000 150,000 416,667 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 6 12 Total After Oct 1 ALT Prior to Oct 1 18 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 12 18 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1722E08000 - CTG, .50 Cal, All Types Army UNCLASSIFIED Page 32 of 32 P-1 Line #5 Volume 1 - 182 === page 215 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition P-1 Line Item Number / Title: 2382E08900 / CTG, 20mm, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 263.518 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 263.518 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 263.518 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 7.012 25.773 9.427 - 9.427 32.000 8.402 29.876 30.174 - - - - - - - - - - - 7.012 25.773 9.427 - 9.427 32.000 8.402 29.876 30.174 - - - - - - - - - - - 7.012 25.773 9.427 - 9.427 32.000 8.402 29.876 30.174 - Total 406.182 406.182 406.182 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line includes 20MM ALL TYPES: (E08909) The 20MM M940 Multi-Purpose Tracer - Self-Destruct (MPT-SD) cartridge, w/ MK7 Link, is an improved, pyrotechnically initiated, 20mm High Explosive cartridge. The nose consists of a single tungsten penetrator tip designed to pierce incoming threats prior to initiation. The projectile consists of a heavy walled steel body charged with an explosive mix and an incendiary mix. The M940 is a force protection munition fired from the M61 cannon used within the Land Based Phalanx Weapon System (LPWS) for Counter-Rocket, Artillery and Mortar (C-RAM) application. The projectile self-destructs if it misses its intended target, minimizing collateral surface damage when engaging airborne targets. The M940 (JUONs) has been enhanced for improved lethality against larger rocket threats. This item is Code A, approved for service use. (E08910) The 20MM M55A2 Target Practice (TP) Cartridge is a ballistically matched training round that simulates the tactical 20MM M56 High Explosive Incendiary (HEI) Cartridge. The Land Based Phalanx Weapon System (LPWS) is able to adjust ballistics to account for differences between M940 and M55A2. M55A2 supports training on the M61 cannon used within the LPWS for Counter-Rocket, Artillery and Mortar (C-RAM) application. This item is Code A, approved for service use. LI 2382E08900 - CTG, 20mm, All Types Army UNCLASSIFIED Page 1 of 8 P-1 Line #6 Volume 1 - 183 === page 216 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition P-1 Line Item Number / Title: 2382E08900 / CTG, 20mm, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 E08909 / CTG, 20mm MPT-SD, M940 w/MK7 Link [AC34] P-5a A - / 244.294 - / 4.690 - / 3.728 - / 3.821 - / - - / 3.821 P-5 E08910 / Cartridge, 20MM, Practice [AC18] P-5a A - / 19.224 - / 2.322 - / 22.045 - / 5.606 - / - - / 5.606 P-40 Total Gross/Weapon System Cost - / 263.518 - / 7.012 - / 25.773 - / 9.427 - / - - / 9.427 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 base budget supports critical Army Title 10 war reserve/operational, training, and test requirements in accordance with DoDI 3000.04 (Munitions Requirements Process) and AR 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War (OSW)-approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life-cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. FY 2027 Total Base procurement dollars in the amount of $9.427 million support procurement of 0.105 million cartridges. (E08909) The 20MM M940 Multi-Purpose Tracer - Self-Destruct (MPT-SD) is a war reserve item used in combat. The FY 2027 request builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base Procurement dollars in the amount of $3.821 million support procurement of 0.019 million M940 cartridges. Type classification date: 1989 (E08910) The 20MM M55A2 Target Practice (TP) Cartridge is a training unique item not used in combat. The FY 2027 request supports annual training and builds a depot level in accordance with Army's procurement goals. FY 2027 Base Procurement dollars in the amount of $5.606 million support the procurement of 0.086 million M55A2 cartridges. Type classification date: Unknown, Predates Material Release Process LI 2382E08900 - CTG, 20mm, All Types Army UNCLASSIFIED Page 2 of 8 P-1 Line #6 Volume 1 - 184 === page 217 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2382E08900 / CTG, 20mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E08909 / CTG, 20mm MPT-SD, M940 w/ MK7 Link [AC34] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 4.690 3.728 3.821 - 3.821 - Gross/Weapon System Cost ($ in Millions) 244.294 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 244.294 Plus CY Advance Procurement ($ in Millions) - - - - - 4.690 3.728 3.821 - 3.821 - Total Obligation Authority ($ in Millions) 244.294 FY 2027 Total - - - - - 4.690 3.728 3.821 - 3.821 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, 216.110 119.11 31,918 3.802 168.16 20,750 3.489 174.16 19,090 3.325 - - - 174.16 19,090 3.325 15,941 0.755 50.33 326 0.016 59.76 211 0.013 57.57 194 0.011 - - - 57.57 194 0.011 - 216.865 - - 3.818 - - 3.502 - - 3.336 - - - - - 3.336 - - 216.865 - - 3.818 - - 3.502 - - 3.336 - - - - - 3.336 Production Qualification Test - - - - - 0.001 - - - - - - - - - - - - Subtotal: Support - Product Improvement Cost - - - - - 0.001 - - - - - - - - - - - - Production Engineering - - 27.359 - - 0.479 - - 0.220 - - 0.480 - - - - - 0.480 Subtotal: Support Production Engineering Cost - - 27.359 - - 0.479 - - 0.220 - - 0.480 - - - - - 0.480 Quality Assurance - - 0.070 - - - - - 0.006 - - 0.005 - - - - - 0.005 Subtotal: Support - Quality Assurance Cost - - 0.070 - - - - - 0.006 - - 0.005 - - - - - 0.005 - - - - - 0.392 - - - - - - - - - - - - (†) PACK (LAP) BOX METAL M548 (†) 37.66 5,738,145 47.38 - Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Product Improvement Cost Support - Production Engineering Cost Support - Quality Assurance Cost Support - Recapitalization Cost Recapitalization LI 2382E08900 - CTG, 20mm, All Types Army UNCLASSIFIED Page 3 of 8 P-1 Line #6 Volume 1 - 185 === page 218 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2382E08900 / CTG, 20mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E08909 / CTG, 20mm MPT-SD, M940 w/ MK7 Link [AC34] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) Subtotal: Support Recapitalization Cost - - Gross/Weapon System Cost - - ($) 244.294 FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 0.392 - - - - - - - - - - - - - - 4.690 - - 3.728 - - 3.821 - - - - - 3.821 Remarks: Price differences FY 2025 through FY 2027 are due to contract step ladder pricing matrices based on quantity ranges, as well as negotiated Economic Price Adjustments (EPA), and decisions to change the percentage executed between competing vendors determined during execution. (†) indicates the presence of a P-5a LI 2382E08900 - CTG, 20mm, All Types Army UNCLASSIFIED Page 4 of 8 P-1 Line #6 Volume 1 - 186 === page 219 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) BOX METAL M548 BOX METAL M548 BOX METAL M548 O O C P-1 Line Item Number / Title: 2382E08900 / CTG, 20mm, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP ROCK ISLAND ARSENAL, IL Jun 2025 Sep 2026 31,918 119.11 Y 2026 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 10,375 168.16 Y 2026 GENERAL DYNAMICS ORD & TAC SYS / MARION, IL Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 10,375 168.16 Y 2027 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 9,545 174.16 Y 2027 GENERAL DYNAMICS ORD & TAC SYS / MARION, IL Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 9,545 174.16 Y 2025 MOUNTAIN HORSE, LLC / COLORADO SPRINGS, CO C / FFP ROCK ISLAND ARSENAL, IL Sep 2025 Aug 2026 326 50.33 Y 2026 MOUNTAIN HORSE, LLC / COLORADO SPRINGS, CO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Nov 2026 211 59.76 Y 2027 MOUNTAIN HORSE, LLC / COLORADO SPRINGS, CO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Feb 2028 194 57.57 Y LI 2382E08900 - CTG, 20mm, All Types Army Location of PCO Item Number / Title [DODIC]: E08909 / CTG, 20mm MPT-SD, M940 w/ MK7 Link [AC34] UNCLASSIFIED Page 5 of 8 P-1 Line #6 (Each) RFP Issue Date Volume 1 - 187 === page 220 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2382E08900 / CTG, 20mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E08910 / Cartridge, 20MM, Practice [AC18] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 19.224 2.322 22.045 5.606 - 5.606 - - - - - - 19.224 2.322 22.045 5.606 - 5.606 - - - - - - 19.224 2.322 22.045 5.606 - 5.606 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, 16.518 - - - 32.90 584,356 7,476 0.396 - - - 59.76 - 16.914 - - - - - - 16.914 - - - - - - - - - - - - Production Engineering - - 2.296 Subtotal: Support Production Engineering Cost - - (†) PACK (LAP) BOX METAL M548 (†) 22.40 737,280 53.00 - Subtotal: Recurring Cost Subtotal: Hardware Cost 19.225 45.30 86,270 3.908 - - - 45.30 86,270 3.908 5,901 0.353 57.57 871 0.050 - - - 57.57 871 0.050 - 19.578 - - 3.958 - - - - - 3.958 - - 19.578 - - 3.958 - - - - - 3.958 1.260 - - - - - - - - - - - - - 1.260 - - - - - - - - - - - - - - 1.058 - - 2.461 - - 1.643 - - - - - 1.643 2.296 - - 1.058 - - 2.461 - - 1.643 - - - - - 1.643 Support - Product Improvement Cost Reliability Subtotal: Support - Product Improvement Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.014 - - 0.004 - - 0.006 - - 0.005 - - - - - 0.005 Subtotal: Support - Quality Assurance Cost - - 0.014 - - 0.004 - - 0.006 - - 0.005 - - - - - 0.005 Gross/Weapon System Cost - - 19.224 - - 2.322 - - 22.045 - - 5.606 - - - - - 5.606 LI 2382E08900 - CTG, 20mm, All Types Army UNCLASSIFIED Page 6 of 8 P-1 Line #6 Volume 1 - 188 === page 221 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 P-1 Line Item Number / Title: 2382E08900 / CTG, 20mm, All Types ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E08910 / Cartridge, 20MM, Practice [AC18] MDAP/MAIS Code: Remarks: Price differences between FY 2026 and FY 2027 are due to contract step ladder pricing matrices based on quantity ranges. (†) indicates the presence of a P-5a LI 2382E08900 - CTG, 20mm, All Types Army UNCLASSIFIED Page 7 of 8 P-1 Line #6 Volume 1 - 189 === page 222 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) BOX METAL M548 BOX METAL M548 O O C P-1 Line Item Number / Title: 2382E08900 / CTG, 20mm, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 292,178 32.90 Y 2026 GENERAL DYNAMICS ORD & TAC SYS / MARION, IL Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 292,178 32.90 Y 2027 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 43,135 45.30 Y 2027 GENERAL DYNAMICS ORD & TAC SYS / MARION, IL Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 43,135 45.30 Y 2026 MOUNTAIN HORSE, LLC / COLORADO SPRINGS, CO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Nov 2026 5,901 59.76 Y 2027 MOUNTAIN HORSE, LLC / COLORADO SPRINGS, CO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Feb 2028 871 57.57 Y LI 2382E08900 - CTG, 20mm, All Types Army Location of PCO Item Number / Title [DODIC]: E08910 / Cartridge, 20MM, Practice [AC18] UNCLASSIFIED Page 8 of 8 P-1 Line #6 RFP Issue Date Volume 1 - 190 === page 223 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition P-1 Line Item Number / Title: 2650E08200 / CTG, 25mm, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 907.388 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 907.388 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 907.388 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 24.246 22.324 34.038 - 34.038 42.267 50.549 20.959 21.167 - - - - - - - - - - - 24.246 22.324 34.038 - 34.038 42.267 50.549 20.959 21.167 - - - - - - - - - - - 24.246 22.324 34.038 - 34.038 42.267 50.549 20.959 21.167 - Total 1,122.938 1,122.938 1,122.938 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line includes 25MM ALL TYPES: (E08201) The 25MM XM1228 Bradley Aerial Defeat Ground Enhanced Round (BADGER) cartridge is a munition that provides the Bradley Fighting Vehicle the organic capability to defeat Small Unmanned Aerial Systems using a Proximity Fuze. This item is Code B, not approved for service use. (E08204) The 25MM M910 Target Practice Discarding Sabot-Tracer (TPDS-T) cartridge is a ballistically matched training round that simulates the M791 25MM Armor Piercing Discarding Sabot-Tracer (APDS-T) cartridge. The M910 is also used as a training counterpart for the M919 25MM Armor Piercing Discarding Sabot Fin Stabilized-Traced (APDSFS-T) cartridge, although the M910 cannot simulate the range of the M919. The M910 supports gunnery training for the Army's Bradley Fighting Vehicles (BFV) and Marine Corps' Light Armored Vehicles. The M910 is a percussion primed round, packed in linked belts, using the M28 metal link, of 30 cartridges per PA125 container. This item is Code A, approved for service use. LI 2650E08200 - CTG, 25mm, All Types Army UNCLASSIFIED Page 1 of 15 P-1 Line #7 Volume 1 - 191 === page 224 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition P-1 Line Item Number / Title: 2650E08200 / CTG, 25mm, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 E08201 / CTG 25MM HEI-T M792 [A975] P-5a, P-21 B - / 451.313 / - - / 3.026 - / 16.803 - / - - / 16.803 P-5 E08204 / CTG 25MM TPDS-T M910 [A940] P-5a, P-21 A - / 456.075 - / 24.246 - / 19.298 - / 17.235 - / - - / 17.235 P-40 Total Gross/Weapon System Cost - / 907.388 - / 24.246 - / 22.324 - / 34.038 - / - - / 34.038 - *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 base budget supports critical Army Title 10 war reserve/operational, training, and test requirements in accordance with DoDI 3000.04 (Munitions Requirements Process) and AR 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War (OSW)-approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life-cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. FY 2027 Total Base dollars in the amount of $34.038 million supports the procurement of 0.131 million cartridges. (E08201) The 25MM XM1228 Bradley Aerial Defeat Ground Enhanced Round (BADGER) cartridge is a war reserve item used in combat. The FY 2027 request builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $16.803 million supports the procurement of 0.005 million XM1228 cartridges. XM1228 Type classification date: PENDING (E08204) The 25MM M910 Target Practice Discarding Sabot-Tracer (TPDS-T) cartridge is a training unique item not used in combat. The FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $17.235 million supports the procurement of 0.126 million M910 cartridges. Type classification date: 1988 LI 2650E08200 - CTG, 25mm, All Types Army UNCLASSIFIED Page 2 of 15 P-1 Line #7 Volume 1 - 192 === page 225 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2650E08200 / CTG, 25mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E08201 / CTG 25MM HEI-T M792 [A975] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) 451.313 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 451.313 Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) 451.313 FY 2027 Base FY 2027 OOC - - - - FY 2027 Total - - 3.026 16.803 - 16.803 - - - - - - 3.026 16.803 - 16.803 - - - - - - 3.026 16.803 - 16.803 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost CTG 25MM XM1228 (†) - - - - CTG 25MM HEIT M792 LOAD, ASSEMBLE, PACK (LAP) 41.47 9,231,955 382.877 - - - Container PA125 95.60 Subtotal: Recurring Cost - 65,444 6.256 - - - 389.133 - - - - 389.133 - First Article Test - - - Subtotal: Support Acceptance Testing Cost - - - - - - - Production Engineering - Subtotal: Support Production Engineering Cost - BADGER Subtotal: Hardware Cost - - 2,500.00 424 1.060 - - - - - - - - - - - - - - - - - - - - - 0.075 - - - 0.075 - - - - 1.118 - - - 1.118 - - 1,175.00 4,889 5.745 - - - - - - - - - - - - - - - 1.060 - - 5.745 - - 1.060 - - 5.745 - - 1.000 - - 4.737 - 1.000 - - 4.737 - - - - - - - - - - - - - 0.966 - - - - 0.966 - 1,175.00 4,889 5.745 - - - - - - - - - - 5.745 - - - - 5.745 - - - - - 4.737 - - - - - 4.737 4.014 - - - - - 4.014 4.014 - - - - - 4.014 - 2.308 - - - - - 2.308 - 2.308 - - - - - 2.308 Support - Acceptance Testing Cost Support - Non-Recurring Support Cost Facilitization Subtotal: Support - NonRecurring Support Cost Support - Production Engineering Cost Support - Quality Assurance Cost LI 2650E08200 - CTG, 25mm, All Types Army UNCLASSIFIED Page 3 of 15 P-1 Line #7 Volume 1 - 193 === page 226 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2650E08200 / CTG, 25mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E08201 / CTG 25MM HEI-T M792 [A975] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Quality Assurance - - 0.009 - - - - - - - - - - - - - - - Subtotal: Support - Quality Assurance Cost - - 0.009 - - - - - - - - - - - - - - - Support - Undistributed Procurement Cost Undistributed Procurement - - 60.978 - - - - - - - - - - - - - - - Subtotal: Support Undistributed Procurement Cost - - 60.978 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 451.313 - - - - - 3.026 - - 16.803 - - - - - 16.803 Remarks: FY 2026 and FY 2027 includes funding for the 25mm XM1228 Bradley Aerial Defeat Ground Enhanced Round (BADGER), which is similar to the M792 cartridge with modifications. The increased cost is as a result of the addition of the proximity fuze. FY 2027 is a production rate increase from FY 2026 to ramp up 25mm BADGER production. (†) indicates the presence of a P-5a LI 2650E08200 - CTG, 25mm, All Types Army UNCLASSIFIED Page 4 of 15 P-1 Line #7 Volume 1 - 194 === page 227 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 O O C Cost Elements (†) CTG 25MM XM1228 BADGER (†) CTG 25MM XM1228 BADGER (†) P-1 Line Item Number / Title: 2650E08200 / CTG, 25mm, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E08201 / CTG 25MM HEI-T M792 [A975] Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN SS / CPFF PICATINNY ARSENAL, NJ Jun 2026 Jun 2027 424 2,500.00 Y 2027 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN SS / CPFF PICATINNY ARSENAL, NJ Mar 2027 Mar 2028 4,889 1,175.00 Y (Each) RFP Issue Date indicates the presence of a P-21 LI 2650E08200 - CTG, 25mm, All Types Army UNCLASSIFIED Page 5 of 15 P-1 Line #7 Volume 1 - 195 === page 228 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2650E08200 / CTG, 25mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E08201 / CTG 25MM HEI-T M792 [A975] Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P CTG 25MM XM1228 BADGER 1 2026 ARMY 424 0 424 1 2027 ARMY 4,889 0 4,889 A O C T LI 2650E08200 - CTG, 25mm, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #7 - - - 36 36 36 36 280 A - - - - - - - 4,889 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 196 === page 229 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2650E08200 / CTG, 25mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E08201 / CTG 25MM HEI-T M792 [A975] Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y Calendar Year 2029 J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E CTG 25MM XM1228 BADGER 1 2026 ARMY 424 144 280 35 35 35 35 35 35 35 35 1 2027 ARMY 4,889 0 4,889 - - - - - 412 407 407 407 407 407 407 407 407 407 407 407 M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B O C T LI 2650E08200 - CTG, 25mm, All Types Army N O V D E C J A N F E B 0 UNCLASSIFIED Page 7 of 15 P-1 Line #7 0 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 197 === page 230 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2650E08200 / CTG, 25mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Item Number / Title [DODIC]: E08201 / CTG 25MM HEI-T M792 [A975] Production Rates (Each / Month) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 NORTHROP GRUMMAN SYSTEMS CORP PLYMOUTH, MN MSR For 2027 1-8-5 For 2027 MAX For 2027 400 5,000 20,000 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 6 12 Total After Oct 1 ALT Prior to Oct 1 18 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 12 18 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 2650E08200 - CTG, 25mm, All Types Army UNCLASSIFIED Page 8 of 15 P-1 Line #7 Volume 1 - 198 === page 231 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2650E08200 / CTG, 25mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E08204 / CTG 25MM TPDS-T M910 [A940] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 24.246 19.298 17.235 - 17.235 - Gross/Weapon System Cost ($ in Millions) 456.075 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 456.075 Plus CY Advance Procurement ($ in Millions) - - - - - 24.246 19.298 17.235 - 17.235 - Total Obligation Authority ($ in Millions) 456.075 FY 2027 Total - - - - - 24.246 19.298 17.235 - 17.235 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost FY 2027 Base Total Cost Qty ($) (Each) ($ M) 20.741 107.01 136,932 Unit Cost FY 2027 OOC Total Cost Qty ($) (Each) ($ M) 14.653 112.43 126,338 Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) Total Cost Qty ($) (Each) ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, 450.256 55.29 375,138 34,698 2.878 107.57 12,680 1.364 141.29 4,628 0.654 151.26 - 453.134 - - 22.105 - - 15.307 - - - 453.134 - - 22.105 - - 15.307 Production Engineering - - 2.925 - - 2.137 - - Subtotal: Support Production Engineering Cost - - 2.925 - - 2.137 - (†) PACK (LAP) CONTAINER PA125 (†) 46.47 9,689,174 82.94 - Subtotal: Recurring Cost Subtotal: Hardware Cost 14.204 - - - 112.43 126,338 14.204 4,270 0.646 - - - 151.26 4,270 0.646 - 14.850 - - - - - 14.850 - - 14.850 - - - - - 14.850 3.985 - - 2.381 - - - - - 2.381 - 3.985 - - 2.381 - - - - - 2.381 Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.016 - - 0.003 - - 0.006 - - 0.004 - - - - - 0.004 Subtotal: Support - Quality Assurance Cost - - 0.016 - - 0.003 - - 0.006 - - 0.004 - - - - - 0.004 Gross/Weapon System Cost - - 456.075 - - 24.246 - - 19.298 - - 17.235 - - - - - 17.235 Remarks: Price differences FY 2025 through FY 2027 are due to contract step ladder pricing matrices based on quantity ranges, as well as negotiated Economic Price Adjustments (EPA), and decisions to change the percentage executed between competing vendors determined during execution. Other service and FMS orders during the year of execution also result in lower prices due to additional demand resulting in a higher quantity for a lower price range on the step ladder pricing matrix. LI 2650E08200 - CTG, 25mm, All Types Army UNCLASSIFIED Page 9 of 15 P-1 Line #7 Volume 1 - 199 === page 232 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 P-1 Line Item Number / Title: 2650E08200 / CTG, 25mm, All Types ID Code (A=Service Ready, B=Not Service Ready) : A (†) Item Number / Title [DODIC]: E08204 / CTG 25MM TPDS-T M910 [A940] MDAP/MAIS Code: indicates the presence of a P-5a LI 2650E08200 - CTG, 25mm, All Types Army UNCLASSIFIED Page 10 of 15 P-1 Line #7 Volume 1 - 200 === page 233 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 O O C Cost Elements LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) CONTAINER PA125 CONTAINER PA125 CONTAINER PA125 (†) P-1 Line Item Number / Title: 2650E08200 / CTG, 25mm, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E08204 / CTG 25MM TPDS-T M910 [A940] Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP ROCK ISLAND ARSENAL, IL Jun 2025 Sep 2026 375,138 55.29 Y 2026 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 68,466 107.01 Y 2026 GENERAL DYNAMICS ORD & TAC SYS / MARION, IL Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 68,466 107.01 Y 2027 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 63,169 112.43 Y 2027 GENERAL DYNAMICS ORD & TAC SYS / MARION, IL Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 63,169 112.43 Y 2025 CONCO INC. / LOUISVILLE, KY Option / FFP ROCK ISLAND ARSENAL, IL Sep 2025 Apr 2026 12,680 107.57 Y 2026 CONCO INC. / LOUISVILLE, KY Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Nov 2026 4,628 141.29 Y 2027 CONCO INC. / LOUISVILLE, KY Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Nov 2027 4,270 151.26 Y RFP Issue Date indicates the presence of a P-21 LI 2650E08200 - CTG, 25mm, All Types Army UNCLASSIFIED Page 11 of 15 P-1 Line #7 Volume 1 - 201 === page 234 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2650E08200 / CTG, 25mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E08204 / CTG 25MM TPDS-T M910 [A940] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 9689174 1 2025 ARMY 375.138 .000 375.138 A - - - - - - - - - - - - - - - 1 2025 MC (‡) 87.371 .000 87.371 A - - - - - - - - - - - - - - - 34.108 341.030 7.951 79.420 1 2025 Total 462.509 .000 462.509 - - - - - - - - - - - - - - - 42.059 420.450 1 2026 ARMY 68.466 .000 68.466 A - - - - - - - 1 2026 MC (‡) 3.240 .000 3.240 A - - - - - - - 3.240 1 2026 Total 71.706 .000 71.706 - - - - - - - 71.706 2 2026 ARMY 68.466 .000 68.466 A - - - - - - - 68.466 2 2026 MC (‡) 3.240 .000 3.240 A - - - - - - - 3.240 2 2026 Total 71.706 .000 71.706 - - - - - - - 71.706 1 2027 ARMY 63.169 .000 63.169 63.169 1 2027 MC (‡) 14.317 .000 14.317 14.317 1 2027 Total 77.486 .000 77.486 77.486 2 2027 ARMY 63.169 .000 63.169 63.169 2 2027 MC (‡) 14.317 .000 14.317 14.317 2 2027 Total 77.486 .000 77.486 68.466 77.486 O C T LI 2650E08200 - CTG, 25mm, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #7 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 202 === page 235 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2650E08200 / CTG, 25mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E08204 / CTG 25MM TPDS-T M910 [A940] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 9689174 1 2025 ARMY 375.138 34.108 341.030 34.103 34.103 - 34.103 34.103 34.103 34.103 34.103 34.103 34.103 34.103 1 2025 MC (‡) 87.371 7.951 79.420 7.942 - 7.942 1 2025 Total 462.509 42.059 420.450 42.045 42.045 - 42.045 42.045 42.045 42.045 42.045 42.045 42.045 42.045 1 2026 ARMY 68.466 .000 68.466 - - - - - 5.711 5.705 5.705 5.705 5.705 1 2026 MC (‡) 3.240 .000 3.240 - - - - - .270 .270 .270 .270 1 2026 Total 71.706 .000 71.706 - - - - - 5.981 5.975 5.975 2 2026 ARMY 68.466 .000 68.466 - - - - - 5.711 5.705 2 2026 MC (‡) 3.240 .000 3.240 - - - - - .270 2 2026 Total 71.706 .000 71.706 - - - - - 1 2027 ARMY 63.169 1 2027 MC (‡) 1 2027 Total 2 2027 2 2027 MC 2 2027 7.942 7.942 7.942 7.942 7.942 7.942 7.942 .000 7.942 .000 - - - - - - 5.705 5.705 5.705 5.705 5.705 5.705 5.705 .270 .270 .270 .270 .270 .270 .270 .270 5.975 5.975 5.975 5.975 5.975 5.975 5.975 5.975 5.975 5.705 5.705 5.705 5.705 5.705 5.705 5.705 5.705 5.705 5.705 .270 .270 .270 .270 .270 .270 .270 .270 .270 .270 .270 5.981 5.975 5.975 5.975 5.975 5.975 5.975 5.975 5.975 5.975 5.975 5.975 - - - - - - .000 63.169 A - - - - - - - - - - - - 5.265 5.264 5.264 5.264 5.264 5.264 5.264 26.320 14.317 .000 14.317 A - - - - - - - - - - - - 1.194 1.193 1.193 1.193 1.193 1.193 1.193 77.486 .000 77.486 - - - - - - - - - - - - 6.459 6.457 6.457 6.457 6.457 6.457 6.457 32.285 ARMY 63.169 .000 63.169 A - - - - - - - - - - - - 5.265 5.264 5.264 5.264 5.264 5.264 5.264 26.320 (‡) 14.317 .000 14.317 A - - - - - - - - - - - - 1.194 1.193 1.193 1.193 1.193 1.193 1.193 Total 77.486 .000 77.486 - - - - - - - - - - - - 6.459 6.457 6.457 6.457 6.457 6.457 6.457 32.285 M A R A P R M A Y J U N J U L A U G S E P O C T LI 2650E08200 - CTG, 25mm, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #7 - - - - - - - .000 .000 .000 - - - - - - - .000 .000 .000 - .000 5.965 5.965 Volume 1 - 203 === page 236 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2650E08200 / CTG, 25mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E08204 / CTG 25MM TPDS-T M910 [A940] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 9689174 1 2025 ARMY 375.138 375.138 .000 1 2025 MC (‡) 87.371 87.371 .000 1 2025 Total 462.509 462.509 .000 1 2026 ARMY 68.466 68.466 .000 1 2026 MC (‡) 3.240 3.240 .000 1 2026 Total 71.706 71.706 .000 2 2026 ARMY 68.466 68.466 .000 2 2026 MC (‡) 3.240 3.240 .000 2 2026 Total 71.706 71.706 .000 1 2027 ARMY 63.169 1 2027 MC (‡) 1 2027 2 .000 .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 .000 .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 .000 .000 - - - - - 36.849 26.320 5.264 5.264 5.264 5.264 5.264 14.317 8.352 5.965 1.193 1.193 1.193 1.193 1.193 Total 77.486 45.201 32.285 6.457 6.457 6.457 6.457 6.457 2027 ARMY 63.169 36.849 26.320 5.264 5.264 5.264 5.264 5.264 2 2027 MC (‡) 14.317 8.352 5.965 1.193 1.193 1.193 1.193 1.193 2 2027 Total 77.486 45.201 32.285 6.457 6.457 6.457 6.457 6.457 O C T N O V D E C J A N F E B LI 2650E08200 - CTG, 25mm, All Types Army - - - - - - - - - - - - - - - - - - - .000 .000 .000 - - - - - - - - - - - - - - - - - - - .000 .000 .000 M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #7 M A R A P R M A Y J U N J U L A U G - .000 S E P Volume 1 - 204 === page 237 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2650E08200 / CTG, 25mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Item Number / Title [DODIC]: E08204 / CTG 25MM TPDS-T M910 [A940] Production Rates (Each / Month) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 NORTHROP GRUMMAN SYSTEMS CORP PLYMOUTH, MN 20,000 100,000 125,000 6 6 12 18 6 6 12 18 2 GENERAL DYNAMICS ORD & TAC SYS - MARION, IL 20,000 100,000 125,000 6 6 12 18 6 6 12 18 Remarks: LAP line shared with other 25mm items. Quarterly deliveries. (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 2650E08200 - CTG, 25mm, All Types Army UNCLASSIFIED Page 15 of 15 P-1 Line #7 Volume 1 - 205 === page 238 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 2,108.189 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 2,108.189 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 2,108.189 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 127.341 127.341 127.341 88.232 88.232 88.232 164.116 - - 164.116 - - 164.116 - 164.116 164.116 164.116 146.493 146.493 146.493 148.652 148.652 148.652 131.495 131.495 131.495 To FY 2031 Complete 132.784 132.784 132.784 Total - 3,047.302 - 3,047.302 - 3,047.302 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The FY 2026 spend plan amount for CTG, 30mm, All Types includes $88,232 thousand of discretionary and $62,000 thousand of mandatory (reconciliation) for a total of $150,232 thousand. This budget line includes 30MM ALL TYPES: (E07306) Program of Record (POR) 30x173mm M1173 Target Practice with Trace (TP-T) cartridge is ballistically matched to the tactical round, the XM1182 HEAB-T cartridge, allowing the Warfighter to train in a realistic, cost- effective manner. This item is Code B, not approved for service use. (E07610) 30x173mm High Explosive Airburst with Trace (HEAB-T) cartridge: --30x173mm Program of Record (POR) XM1182 will provide the Warfighter with increased anti-personnel lethality effects against troops in the open and behind urban structures, counter defilade capability, enhancing the operational effectiveness and lethality of the Stryker Infantry Carrier Vehicle (ICV) and any Army Fighting Vehicles that are equipped with a 30x173mm weapon system. This item is Code B, not approved for service use. --30x173mm High Explosive Proximity will provide the Warfighter with increased capability against small Unmanned Aerial Systems, enhancing the self-protection, operational effectiveness and lethality of the Stryker Infantry Carrier Vehicle (ICV) and any Army Fighting Vehicles that are equipped with a 30x173mm weapon system. This item is Code B, not approved for service use. (E09191) Program of Record (POR) 30x173mm XM1172 Target Practice Discarding Sabot with Trace (TPDS-T) cartridge is ballistically matched to the tactical round, the XM1170 Armor Piercing Fin Stabilized Discarding Sabot with Trace (APFSDS-T) cartridge, allowing the Warfighter to train in a realistic, cost-effective manner. This item is Code B, not approved for service use. (E09292) Program of Record (POR) 30x173mm XM1170 Armor Piercing Fin Stabilized Discarding Sabot with Trace (APFSDS-T) cartridge will provide an organic direct fire capability to support infantry at a greater range and will improve lethality when engaging light-to-medium armored vehicles, increasing anti-materiel capability and enhancing the operational effectiveness and lethality of the Stryker Infantry Carrier Vehicle (ICV) and any Army Fighting Vehicles that are equipped with a 30x173mm weapon system. This item is Code B, not approved for service use. (E09900) 30mm M789 High Explosive Dual Purpose (HEDP) cartridge is the only qualified combat cartridge for use in the Apache Helicopter's M230 Chain Gun. It is also used by the 160th Special Operations Aviation Regiment (SOAR), fired from the MH-60L Blackhawk helicopter. The M789 cartridge consists of a projectile containing explosive, a shaped charge liner, an M759 point-detonating fuze, aluminum LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 1 of 47 P-1 Line #8 Volume 1 - 206 === page 239 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A cartridge case, propellant and a PA520 electric primer. The shaped charge allows the M789 to defeat light armor, and the steel projectile body provides an anti-personnel capability. M789 cartridges are packed in Bulk Ammunition Strips (BAS), 110 cartridges per M592 container. This item is Code A, approved for service use. (E10100) 30mm Target Practice (TP) cartridge: --30mm M788 TP is the only qualified training cartridge for use in the Apache and Blackhawk Helicopter's M230 Chain Gun. The M788 is a ballistic match to the M789 HEDP and consists of an inert projectile, lightweight aluminum cartridge case, propellant, and PA520 electric primer. M788 cartridges are packed in Bulk Ammunition Strips (BAS), 110 cartridges per M592 container. This item is Code A, approved for service use. --30mm XM950 TP is the only qualified training cartridge for use in the XM914E1 Chain Gun with Percussion Prime Kit used on the Mobile-Low, Slow, Small Unmanned Aircraft Integrated Defeat System (MLIDS) ground vehicle platforms in response to Joint Urgent Operational Need (JUON) CC-0558, ONS 22-38522, and ONS 22-38528, and a Directed Requirement for Initial Maneuver Short Range Air Defense (IM-SHORAD) platforms. The XM950 is a ballistic match to the XM1198 HEDP-SD and consists of an inert projectile, lightweight aluminum cartridge case, propellant, and PA520 electric primer. XM950 cartridges are packed in a linked assembly with 72 cartridges per M592 container. This item is Code B, not approved for service use. (E10111) 30mm High Explosive Proximity (HEP) cartridge: --30x113mm XM1211 High Explosive Proximity (HEP) cartridge is a qualified combat cartridge for use in the XM914 Chain Gun mounted on the Mobile-Low, Slow, Small Unmanned Aircraft Integrated Defeat System (M-LIDS) and Marine Air Defense Integrated System (MADIS) ground vehicle platforms in response to Joint Urgent Operational Need Statement (JUONS) CC-0558, ONS 22-38522, and ONS 22-38528. The XM1211 cartridge consists of a projectile containing high explosive, a proximity module, an M759 Safe and Arm (S&A) device, an aluminum cartridge case, propellant and an M36A2 percussion primer. The proximity module detects nearby targets and detonates without the need for direct impact. The cartridge incorporates an electric self-destruct feature, which will cause the projectile to detonate at predetermined range, reducing collateral damage when engaging aerial targets. XM1211 cartridges are packed in a linked assembly with 72 cartridges per M592 container. This item is Code B, not approved for service use. --The 30x113mm XM1223 Multi-Mode Proximity Airburst (MMPA) is a munition that provides the Maneuver Short Range Air Defense Increment 3 (M-SHORAD INC 3), the Mobile-Low, Slow, Small Unmanned Aircraft Integrated Defeat System (M-LIDS), and other platforms equipped with a 30mm weapon, Counter Unmanned Aerial Systems (C-UAS) capability while retaining the ability to quickly transition to ground targets without having to swap ammunition. This item is Code B, not approved for service use. (E91122) 30x113mm XM1225 Aviation Proximity Explosive (APEX) cartridge is a combat cartridge for use in the Apache Helicopter M230 Chain Gun in response to Operational Need Statement (ONS) 07-1402 and in support of the Apache AH-64E version 6 system. The XM1225 cartridge consists of a projectile containing high explosive, a proximity module, an M759 Safe and Arm (S&A) device, an aluminum cartridge case, propellant and a PA520 electric primer. The proximity module provides increased lethality through airburst effects against personnel, small boats, and small Groups 1 & 2 Unmanned Aerial Systems (sUAS) without requiring modification to the Apache Helicopter M230 Area Weapon and fire control systems. XM1225 cartridges are packed in Bulk Ammunition Strips (BAS), 110 cartridges per M592 container. This item is Code B, not approved for service use. LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 2 of 47 P-1 Line #8 Volume 1 - 207 === page 240 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 E07306 / CTG, 30MM TP-T [AC72] P-5a, P-21 B - / 92.113 - / 0.650 - / 7.868 - / 7.514 - / - - / 7.514 P-5 E07610 / CTG, 30MM, HEAB-T [AC73] P-5a, P-21 B - / 108.245 - / 10.217 - / 17.532 - / 29.527 - / - - / 29.527 P-5 E09191 / CTG, 30MM TPDS-T [AC79] P-5a, P-21 B - / 84.258 - / 1.891 - / 8.149 - / 7.827 - / - - / 7.827 P-5 E09292 / CTG, 30MM APFSDS-T [AC78] P-5a, P-21 B - / 78.697 / - - / 9.372 - / 19.288 - / - - / 19.288 P-5 E09900 / CTG, 30MM HEDP [B129] P-5a, P-21 A P-5 E10100 / CTG, 30MM TP [B118] P-5a, P-21 A P-5 E10111 / CARTRIDGE, 30 MILLIMETER HIGH EXPLOSIVE PROXIMITY [AC61] P-5a, P-21 B P-5 E91122 / CTG, 30MM C-UAS HE PROXIMITY FUSE [AD10] P-40 Total Gross/Weapon System Cost - / 1,029.704 - / 7.264 - / 5.781 - / 5.925 - / - - / 5.925 / 555.826 - / 21.460 - / 32.139 - / 59.816 - / - - / 59.816 / 159.346 - / 85.859 - / 6.504 - / 34.219 - / - - / - - / 0.887 / - - / - / 127.341 - / 88.232 / 164.116 - / - - B - - / - / 2,108.189 - - / 34.219 - - / / 164.116 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 base budget supports critical Army Title 10 war reserve/operational, training, and test requirements in accordance with DoDI 3000.04 (Munitions Requirements Process) and AR 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War (OSW)-approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life-cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. FY 2027 Total Base procurement dollars in the amount of $164.116 million support procurement of 1.602 million 30mm cartridges. (E07306) 30x173mm M1173 Target Practice with Trace (TP-T) is a training unique item not used in combat. The FY 2027 request supports annual training and builds a depot level in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $7.514 million support the procurement of 0.038 million M1173 cartridges. Type classification date: 2024 (E07610) 30x173mm XM1182 High Explosive Airburst with Trace (HEAB-T) is a war reserve item used in combat. The FY 2027 request builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $14.927 million support the procurement of 0.004 million XM1182 cartridges. 30x173mm High Explosive Proximity (HEP) is a war reserve item used in combat. The FY 2027 request builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $14.600 million support the procurement of 0.004 million HEP cartridges. Type classification date: PENDING (E09191) 30x173mm XM1172 Target Practice Discarding Sabot with Trace (TPDS-T) is a training unique item not used in combat. The FY 2027 request supports annual training and builds a depot level in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $7.827 million support the procurement of 0.033 million XM1172 cartridges. LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 3 of 47 P-1 Line #8 Volume 1 - 208 === page 241 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Type classification date: PENDING (E09292) 30x173mm XM1170 Armor Piercing Fin Stabilized Discarding Sabot with Trace (APFSDS-T) is a war reserve item used in combat. The FY 2027 request builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $19.288 million support the procurement of 0.012 million XM1170 cartridges. Type classification date: PENDING (E09900) 30mm M789 High Explosive Dual Purpose (HEDP) is a war reserve item used in combat. The FY 2027 request builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $5.925 million support the procurement of 0.023 million M789 cartridges. M789 Type classification date: 1962 (E10100) 30mm M788 Target Practice (TP) is a training unique item not used in combat. 30mm XM950 Target Practice (TP) is a training unique item not used in combat. The FY 2027 request supports annual training and builds a depot level in accordance with Army's procurement goals. FY 2027 Base Procurement dollars in the amount of $59.816 million support the procurement of 1.477 million 30mm M788 cartridges. M788 Type classification date: 1982 XM950 Type classification date: PENDING (E10111) 30x113mm XM1211 High Explosive Proximity (HEP) is a war reserve item used in combat. The FY 2027 request builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $16.506 million support the procurement of 0.007 million XM1211 cartridges. 30x113mm XM1223 Multi-Mode Proximity Airburst (MMPA) is a war reserve item used in combat. The FY 2027 request builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $17.713 million supports the procurement of 0.004 million XM1223 cartridges. XM1211 Type classification date: PENDING XM1223 Type classification date: PENDING (E91122) 30x113mm XM1225 Aviation Proximity Explosive (APEX) is a war reserve item used in combat. The request supports a war reserve inventory in accordance with the Army's procurement goals. There is no FY 2027 budget request for this item. XM1225 Type classification date: PENDING LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 4 of 47 P-1 Line #8 Volume 1 - 209 === page 242 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E07306 / CTG, 30MM TP-T [AC72] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 92.113 0.650 7.868 7.514 - 7.514 - - - - - - 92.113 0.650 7.868 7.514 - 7.514 - - - - - - 92.113 0.650 7.868 7.514 - 7.514 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost FY 2025 Total Cost Qty ($) (Each) ($ M) 124.94 331,771 Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost 30x173MM, XM1173 (†) TP-T Subtotal: Recurring Cost 41.450 - - - 165.55 37,383 6.189 168.86 37,953 6.409 - - - 168.86 37,953 6.409 - - 41.450 - - - - - 6.189 - - 6.409 - - - - - 6.409 - - 41.450 - - - - - 6.189 - - 6.409 - - - - - 6.409 Production Engineering - - 50.633 - - 0.646 - - 1.667 - - 1.100 - - - - - 1.100 Subtotal: Support Production Engineering Cost - - 50.633 - - 0.646 - - 1.667 - - 1.100 - - - - - 1.100 Subtotal: Hardware Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.030 - - 0.004 - - 0.012 - - 0.005 - - - - - 0.005 Subtotal: Support - Quality Assurance Cost - - 0.030 - - 0.004 - - 0.012 - - 0.005 - - - - - 0.005 Gross/Weapon System Cost - - 92.113 - - 0.650 - - 7.868 - - 7.514 - - - - - 7.514 (†) indicates the presence of a P-5a LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 5 of 47 P-1 Line #8 Volume 1 - 210 === page 243 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 O O C Cost Elements (†) 30x173MM, XM1173 TP-T (†) 30x173MM, XM1173 TP-T (†) P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E07306 / CTG, 30MM TP-T [AC72] Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Feb 2028 37,383 165.55 Y 2027 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 37,953 168.86 Y (Each) RFP Issue Date indicates the presence of a P-21 LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 6 of 47 P-1 Line #8 Volume 1 - 211 === page 244 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E07306 / CTG, 30MM TP-T [AC72] Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 30x173MM, XM1173 TP-T Prior Years Deliveries: 331771 1 2026 ARMY 37.383 .000 37.383 1 2027 ARMY 37.953 .000 37.953 A O C T LI 2938ER8120 - CTG, 30mm, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 47 S E P O C T N O V D E C J A N F E B P-1 Line #8 - - - - - - - 37.383 A - - - - - - - 37.953 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 212 === page 245 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E07306 / CTG, 30MM TP-T [AC72] Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N Calendar Year 2029 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 30x173MM, XM1173 TP-T Prior Years Deliveries: 331771 1 2026 ARMY 37.383 .000 37.383 - - - - 3.118 3.115 3.115 3.115 3.115 3.115 3.115 3.115 3.115 3.115 3.115 3.115 1 2027 ARMY 37.953 .000 37.953 - - - - - - - - - - - 3.171 3.162 3.162 3.162 3.162 3.162 3.162 3.162 3.162 3.162 3.162 3.162 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G O C T LI 2938ER8120 - CTG, 30mm, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 47 .000 P-1 Line #8 .000 S E P Volume 1 - 213 === page 246 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Item Number / Title [DODIC]: E07306 / CTG, 30MM TP-T [AC72] Production Rates (Each / Month) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 NORTHROP GRUMMAN SYSTEMS CORP PLYMOUTH, MN MSR For 2027 1-8-5 For 2027 MAX For 2027 1,000 70,000 160,000 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 6 18 Total After Oct 1 ALT Prior to Oct 1 24 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 18 24 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 9 of 47 P-1 Line #8 Volume 1 - 214 === page 247 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E07610 / CTG, 30MM, HEAB-T [AC73] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 10.217 17.532 29.527 - 29.527 - Gross/Weapon System Cost ($ in Millions) 108.245 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 108.245 Plus CY Advance Procurement ($ in Millions) - - - - - 10.217 17.532 29.527 - 29.527 - Total Obligation Authority ($ in Millions) 108.245 FY 2027 Total - - - - - 10.217 17.532 29.527 - 29.527 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost 30x173MM XM1182 HEAB-T (†) 2,625.08 (†) 29,425 77.243 2,570.39 502 1.290 2,570.39 6,138 15.777 2,621.80 4,042 2,400.00 10.597 - - - 2,621.80 4,042 2,400.00 10.597 30x173MM HEP - - - - - - - - - 4,000 9.600 - - - 4,000 9.600 Subtotal: Recurring Cost - - 77.243 - - 1.290 - - 15.777 - - 20.197 - - - - - 20.197 - - 77.243 - - 1.290 - - 15.777 - - 20.197 - - - - - 20.197 First Article Test - - - - - - - - - - - 5.000 - - - - - 5.000 Subtotal: Support Acceptance Testing Cost - - - - - - - - - - - 5.000 - - - - - 5.000 - - 4.421 - - 8.792 - - - - - - - - - - - - - - 4.421 - - 8.792 - - - - - - - - - - - - Production Engineering - - 26.559 - - 0.135 - - 1.749 - - 4.325 - - - - - 4.325 Subtotal: Support Production Engineering Cost - - 26.559 - - 0.135 - - 1.749 - - 4.325 - - - - - 4.325 Quality Assurance - - 0.021 - - - - - 0.006 - - 0.005 - - - - - 0.005 Subtotal: Support - Quality Assurance Cost - - 0.021 - - - - - 0.006 - - 0.005 - - - - - 0.005 Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Product Improvement Cost Reliability Subtotal: Support - Product Improvement Cost Support - Production Engineering Cost Support - Quality Assurance Cost LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 10 of 47 P-1 Line #8 Volume 1 - 215 === page 248 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E07610 / CTG, 30MM, HEAB-T [AC73] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Gross/Weapon System Cost (†) Unit Cost ($) - FY 2025 Total Cost Qty (Each) ($ M) - 108.245 Unit Cost ($) - FY 2026 Total Cost Qty (Each) ($ M) - 10.217 Unit Cost ($) - FY 2027 Base Total Cost Qty (Each) ($ M) - 17.532 Unit Cost ($) - FY 2027 OOC Total Cost Qty (Each) ($ M) - Unit Cost ($) 29.527 - FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) - ($) - - Total Cost Qty (Each) ($ M) - 29.527 indicates the presence of a P-5a LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 11 of 47 P-1 Line #8 Volume 1 - 216 === page 249 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 O O C Cost Elements 30x173MM XM1182 HEAB-T (†) 30x173MM XM1182 HEAB-T (†) 30x173MM XM1182 HEAB-T (†) (†) 30x173MM HEP (†) P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E07610 / CTG, 30MM, HEAB-T [AC73] Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Feb 2028 502 2,570.39 Y 2026 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Feb 2028 6,138 2,570.39 Y 2027 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 4,042 2,621.80 Y 2027 TO BE SELECTED / TBS01 C / CPFF PICATINNY ARSENAL, NJ Jun 2027 Jun 2028 4,000 2,400.00 Y (Each) RFP Issue Date indicates the presence of a P-21 LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 12 of 47 P-1 Line #8 Volume 1 - 217 === page 250 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E07610 / CTG, 30MM, HEAB-T [AC73] Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 30x173MM XM1182 HEAB-T Prior Years Deliveries: 29425 1 2025 ARMY 502 0 502 A - - - - - - - - - - - - - - - - - - - 502 1 2026 ARMY 6,138 0 6,138 A - - - - - - - - - - - - - - - - - - - 6,138 1 2027 ARMY 4,042 0 4,042 A - - - - - - - 4,042 4,000 0 4,000 - 4,000 30x173MM HEP 2 2027 ARMY A O C T LI 2938ER8120 - CTG, 30mm, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 47 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 218 === page 251 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E07610 / CTG, 30MM, HEAB-T [AC73] Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B Calendar Year 2029 M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 30x173MM XM1182 HEAB-T Prior Years Deliveries: 29425 1 2025 ARMY 502 0 502 - - - - 502 1 2026 ARMY 6,138 0 6,138 - - - - 517 511 511 511 511 511 511 511 511 511 511 511 0 1 2027 ARMY 4,042 0 4,042 - - - - - - - - - - - 400 400 400 400 400 4,000 0 4,000 0 400 400 400 400 442 A P R M A Y J U N 0 30x173MM HEP 2 2027 ARMY O C T LI 2938ER8120 - CTG, 30mm, All Types Army N O V D E C J A N F E B M A R A P R M A Y 400 400 400 400 400 400 400 400 400 400 J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R UNCLASSIFIED Page 14 of 47 P-1 Line #8 0 J U L A U G S E P Volume 1 - 219 === page 252 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Item Number / Title [DODIC]: E07610 / CTG, 30MM, HEAB-T [AC73] Production Rates (Each / Month) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 NORTHROP GRUMMAN SYSTEMS CORP PLYMOUTH, MN 1,000 70,000 160,000 6 6 18 24 6 6 18 24 2 TO BE SELECTED - TBS01 100 1,000 12,000 9 9 12 21 6 6 12 18 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 15 of 47 P-1 Line #8 Volume 1 - 220 === page 253 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E09191 / CTG, 30MM TPDS-T [AC79] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 84.258 1.891 8.149 7.827 - 7.827 - - - - - - 84.258 1.891 8.149 7.827 - 7.827 - - - - - - 84.258 1.891 8.149 7.827 - 7.827 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost 30x173MM XM1172 (†) 84.25 Subtotal: Recurring Cost - Production Engineering Subtotal: Support Production Engineering Cost TPDS-T Subtotal: Hardware Cost 365,084 30.758 - - - 198.55 23,522 4.670 202.72 32,956 6.681 - - - 202.72 32,956 6.681 - 30.758 - - - - - 4.670 - - 6.681 - - - - - 6.681 - 30.758 - - - - - 4.670 - - 6.681 - - - - - 6.681 - - 53.462 - - 1.891 - - 3.472 - - 1.146 - - - - - 1.146 - - 53.462 - - 1.891 - - 3.472 - - 1.146 - - - - - 1.146 Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.038 - - - - - 0.006 - - - - - - - - - Subtotal: Support - Quality Assurance Cost - - 0.038 - - - - - 0.006 - - - - - - - - - Gross/Weapon System Cost - - 84.258 - - 1.891 - - 8.149 - - 7.827 - - - - - 7.827 (†) indicates the presence of a P-5a LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 16 of 47 P-1 Line #8 Volume 1 - 221 === page 254 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 O O C Cost Elements (†) 30x173MM XM1172 TPDS-T (†) 30x173MM XM1172 TPDS-T (†) P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E09191 / CTG, 30MM TPDS-T [AC79] Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 GENERAL DYNAMICS ORD & TAC / MARION, IL Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Jul 2027 23,522 198.55 Y 2027 GENERAL DYNAMICS ORD & TAC / MARION, IL Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 32,956 202.72 Y (Each) RFP Issue Date indicates the presence of a P-21 LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 17 of 47 P-1 Line #8 Volume 1 - 222 === page 255 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E09191 / CTG, 30MM TPDS-T [AC79] Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 30x173MM XM1172 TPDS-T Prior Years Deliveries: 365084 1 2026 ARMY 23.522 .000 23.522 1 2027 ARMY 32.956 .000 32.956 A O C T LI 2938ER8120 - CTG, 30mm, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 18 of 47 S E P O C T N O V D E C J A N F E B P-1 Line #8 - - - - 1.962 1.960 A - - - - - - M A R A P R M A Y J U N J U L A U G 1.960 17.640 - 32.956 S E P Volume 1 - 223 === page 256 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E09191 / CTG, 30MM TPDS-T [AC79] Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G 2.750 2.746 2.746 2.746 2.746 2.746 2.746 2.746 2.746 2.746 2.746 2.746 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 30x173MM XM1172 TPDS-T Prior Years Deliveries: 365084 1 2026 ARMY 23.522 5.882 17.640 1.960 1.960 1.960 1.960 1.960 1.960 1.960 1.960 1.960 1 2027 ARMY 32.956 .000 32.956 - - - - - - - - - O C T LI 2938ER8120 - CTG, 30mm, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N .000 J U L A U G UNCLASSIFIED Page 19 of 47 P-1 Line #8 .000 S E P Volume 1 - 224 === page 257 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Item Number / Title [DODIC]: E09191 / CTG, 30MM TPDS-T [AC79] Production Rates (Each / Month) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 GENERAL DYNAMICS ORD & TAC - MARION, IL MSR For 2027 1-8-5 For 2027 MAX For 2027 1,000 70,000 160,000 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 6 18 Total After Oct 1 ALT Prior to Oct 1 24 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 18 24 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 20 of 47 P-1 Line #8 Volume 1 - 225 === page 258 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E09292 / CTG, 30MM APFSDS-T [AC78] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 78.697 - 9.372 19.288 - 19.288 - - - - - - 78.697 - 9.372 19.288 - 19.288 - - - - - - 78.697 - 9.372 19.288 - 19.288 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost 30x173MM XM1170 - - - - - - - - - - - - - - - - - - Production Engineering - - 78.651 - - Subtotal: Support Production Engineering Cost - - 78.651 - (†) APFSDS-T Subtotal: Recurring Cost Subtotal: Hardware Cost 1,514.11 5,106 7.731 - - 7.731 - - 7.731 - - - - - - 1,354.80 12,152 16.464 - - - - - 16.464 - - - - - 16.464 - - - 1.629 - - 2.824 - - - 1.629 - - 2.824 - 1,354.80 12,152 16.464 - - 16.464 - - 16.464 - - - 2.824 - - - - 2.824 Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.046 - - - - - 0.012 - - - - - - - - - Subtotal: Support - Quality Assurance Cost - - 0.046 - - - - - 0.012 - - - - - - - - - Gross/Weapon System Cost - - 78.697 - - - - - 9.372 - - 19.288 - - - - - 19.288 Remarks: FY 2027 is a production rate increase from FY 2026 due to production ramp up to meet Total Munitions Requirements (TMR). (†) indicates the presence of a P-5a LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 21 of 47 P-1 Line #8 Volume 1 - 226 === page 259 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 O O C Cost Elements (†) 30x173MM XM1170 APFSDS-T (†) 30x173MM XM1170 APFSDS-T (†) P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E09292 / CTG, 30MM APFSDS-T [AC78] Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 GENERAL DYNAMICS ORD & TAC / MARION, IL Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 5,106 1,514.11 Y 2027 GENERAL DYNAMICS ORD & TAC / MARION, IL Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 12,152 1,354.80 Y (Each) RFP Issue Date indicates the presence of a P-21 LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 22 of 47 P-1 Line #8 Volume 1 - 227 === page 260 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E09292 / CTG, 30MM APFSDS-T [AC78] Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 30x173MM XM1170 APFSDS-T 1 2026 ARMY 5.106 .000 1 2027 ARMY 12.152 .000 12.152 5.106 A O C T LI 2938ER8120 - CTG, 30mm, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 23 of 47 S E P O C T N O V D E C J A N F E B P-1 Line #8 - - - - - - .426 4.680 A - - - - - - - 12.152 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 228 === page 261 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E09292 / CTG, 30MM APFSDS-T [AC78] Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G 1.020 1.012 1.012 1.012 1.012 1.012 1.012 1.012 1.012 1.012 1.012 1.012 S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 30x173MM XM1170 APFSDS-T 1 2026 ARMY 5.106 .426 1 2027 ARMY 12.152 .000 12.152 4.680 .426 .426 .426 .426 .426 .425 .425 .425 .425 .425 .425 - - - - - - - - - - - O C T LI 2938ER8120 - CTG, 30mm, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 24 of 47 .000 P-1 Line #8 .000 S E P Volume 1 - 229 === page 262 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Item Number / Title [DODIC]: E09292 / CTG, 30MM APFSDS-T [AC78] Production Rates (Each / Month) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 GENERAL DYNAMICS ORD & TAC - MARION, IL MSR For 2027 1-8-5 For 2027 MAX For 2027 1,000 70,000 160,000 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 6 18 Total After Oct 1 ALT Prior to Oct 1 24 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 18 24 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 25 of 47 P-1 Line #8 Volume 1 - 230 === page 263 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E09900 / CTG, 30MM HEDP [B129] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 7.264 5.781 5.925 - 5.925 - Gross/Weapon System Cost ($ in Millions) 1,029.704 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 1,029.704 Plus CY Advance Procurement ($ in Millions) - - - - - 7.264 5.781 5.925 - 5.925 - Total Obligation Authority ($ in Millions) 1,029.704 FY 2027 Total - - - - - 7.264 5.781 5.925 - 5.925 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE ROUND 74.88 13,303,707 COMPLETE ROUND XM1198 HEDP-SD 122.37 158,778 Subtotal: Recurring Cost - - - - Production Engineering - Subtotal: Support Production Engineering Cost M789 (†) Subtotal: Hardware Cost 996.168 107.37 63,287 6.795 231.96 23,285 5.401 239.16 22,906 19.429 - 1,015.598 - 1,015.598 - - 5.478 - - - 239.16 22,906 - - - - 6.795 - - - - - 5.401 - - - 6.795 - - 5.401 13.956 - - 0.462 - - - 13.956 - - 0.462 - 5.478 - - - - - - - - - 5.478 - - - - - 5.478 - - 5.478 - - - - - 5.478 0.374 - - 0.442 - - - - - 0.442 - 0.374 - - 0.442 - - - - - 0.442 Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.150 - - 0.007 - - 0.006 - - 0.005 - - - - - 0.005 Subtotal: Support - Quality Assurance Cost - - 0.150 - - 0.007 - - 0.006 - - 0.005 - - - - - 0.005 Gross/Weapon System Cost - - 1,029.704 - - 7.264 - - 5.781 - - 5.925 - - - - - 5.925 Remarks: Price differences FY 2025 through FY 2027 are due to step ladder pricing matrices based on quantity ranges, as well as negotiated Economic Price Adjustments (EPA), and decisions to change the percentage executed between competing vendors determined during execution. FMS orders during the year of execution also result in lower prices due to additional demand resulting in a higher quantity for a lower price range on the step ladder pricing matrix. LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 26 of 47 P-1 Line #8 Volume 1 - 231 === page 264 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types ID Code (A=Service Ready, B=Not Service Ready) : A (†) Item Number / Title [DODIC]: E09900 / CTG, 30MM HEDP [B129] MDAP/MAIS Code: indicates the presence of a P-5a LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 27 of 47 P-1 Line #8 Volume 1 - 232 === page 265 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 O O C Cost Elements (†) COMPLETE ROUND M789 (†) COMPLETE ROUND M789 (†) COMPLETE ROUND M789 (†) P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E09900 / CTG, 30MM HEDP [B129] Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP ROCK ISLAND ARSENAL, IL Sep 2025 Sep 2026 63,287 107.37 Y 2026 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 23,285 231.96 Y 2027 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 22,906 239.16 Y (Each) RFP Issue Date indicates the presence of a P-21 LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 28 of 47 P-1 Line #8 Volume 1 - 233 === page 266 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E09900 / CTG, 30MM HEDP [B129] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND M789 Prior Years Deliveries: 13303707 1 2025 ARMY 63.287 .000 63.287 1 2026 ARMY 23.285 .000 23.285 1 2027 ARMY 22.906 .000 22.906 A - - - - - - - - - - - - A - - - - - - 5.284 58.003 - 23.285 22.906 O C T LI 2938ER8120 - CTG, 30mm, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 29 of 47 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 234 === page 267 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E09900 / CTG, 30MM HEDP [B129] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B Calendar Year 2028 M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND M789 Prior Years Deliveries: 13303707 1 2025 ARMY 63.287 5.284 58.003 5.273 5.273 5.273 5.273 5.273 5.273 5.273 5.273 5.273 5.273 5.273 1 2026 ARMY 23.285 .000 23.285 - - - - - 1.945 1.940 1.940 1.940 1.940 1.940 1.940 1.940 1.940 1.940 1.940 1.940 1 2027 ARMY 22.906 .000 22.906 A - - - - - - - - - - - - O C T LI 2938ER8120 - CTG, 30mm, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 30 of 47 .000 S E P O C T N O V D E C J A N F E B P-1 Line #8 .000 1.918 1.908 1.908 1.908 1.908 1.908 1.908 M A R A P R M A Y J U N J U L A U G S E P 9.540 Volume 1 - 235 === page 268 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E09900 / CTG, 30MM HEDP [B129] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND M789 Prior Years Deliveries: 13303707 1 2025 ARMY 63.287 63.287 .000 1 2026 ARMY 23.285 23.285 .000 1 2027 ARMY 22.906 13.366 9.540 .000 .000 1.908 1.908 1.908 1.908 1.908 O C T N O V D E C J A N F E B LI 2938ER8120 - CTG, 30mm, All Types Army .000 M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 31 of 47 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 236 === page 269 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Item Number / Title [DODIC]: E09900 / CTG, 30MM HEDP [B129] Production Rates (Each / Month) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 NORTHROP GRUMMAN SYSTEMS CORP PLYMOUTH, MN MSR For 2027 1-8-5 For 2027 MAX For 2027 1,000 30,000 65,000 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 6 12 Total After Oct 1 ALT Prior to Oct 1 18 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 12 18 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 32 of 47 P-1 Line #8 Volume 1 - 237 === page 270 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E10100 / CTG, 30MM TP [B118] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 21.460 32.139 59.816 - 59.816 - Gross/Weapon System Cost ($ in Millions) 555.826 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 555.826 Plus CY Advance Procurement ($ in Millions) - - - - - 21.460 32.139 59.816 - 59.816 - Total Obligation Authority ($ in Millions) 555.826 FY 2027 Total - - - - - 21.460 32.139 59.816 - 59.816 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE ROUND M788 TP (†) COMPLETE ROUND XM950 PRACTICE (†) 19.03 26,465,856 503.725 30.75 436,038 13.408 38.46 34.25 551,396 18.886 40.18 139,481 5.604 - Subtotal: Recurring Cost 725,856 27.916 37.46 - - - 1,477,466 55.346 - - - 37.46 1,477,466 55.346 - - - - - - - - - - 522.611 - - 19.013 - - 27.916 - - 55.346 - - - - - 55.346 - - 522.611 - - 19.013 - - 27.916 - - 55.346 - - - - - 55.346 Production Engineering - - 33.148 - - 2.439 - - 4.216 - - 4.470 - - - - - 4.470 Subtotal: Support Production Engineering Cost - - 33.148 - - 2.439 - - 4.216 - - 4.470 - - - - - 4.470 Subtotal: Hardware Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.068 - - 0.008 - - 0.006 - - - - - - - - - Subtotal: Support - Quality Assurance Cost - - 0.068 - - 0.008 - - 0.006 - - - - - - - - - Gross/Weapon System Cost - - 555.826 - - 21.460 - - 32.139 - - 59.816 - - - - - 59.816 Remarks: FY 2025 funding includes Base funding in support of the 30mm XM950 Target Practice (TP) cartridge, which is a different version of the M788, in support of the Mobile Low, slow, small Intercept and Defeat System (MLIDS) and Initial Maneuver Short Range Air Defense (IM-SHORAD) ground vehicle platforms. LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 33 of 47 P-1 Line #8 Volume 1 - 238 === page 271 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E10100 / CTG, 30MM TP [B118] MDAP/MAIS Code: Price differences FY 2025 through FY 2027 are due to step ladder pricing matrices based on quantity ranges, as well as negotiated Economic Price Adjustments (EPA), and decisions to change the percentage executed between competing vendors determined during execution. FMS orders during the year of execution also result in lower prices due to additional demand resulting in a higher quantity for a lower price range on the step ladder pricing matrix. FY 2027 is a production rate increase from FY 2026 to meet dual vendor minimum sustaining production rates and Total Munitions Requirements (TMR). (†) indicates the presence of a P-5a LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 34 of 47 P-1 Line #8 Volume 1 - 239 === page 272 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 O O C Cost Elements COMPLETE ROUND M788 TP (†) COMPLETE ROUND M788 TP (†) COMPLETE ROUND M788 TP (†) COMPLETE ROUND M788 TP (†) COMPLETE ROUND M788 TP (†) COMPLETE ROUND M788 TP (†) COMPLETE ROUND XM950 PRACTICE (†) P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E10100 / CTG, 30MM TP [B118] Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP ROCK ISLAND ARSENAL, IL Jun 2025 Nov 2026 122,091 30.75 Y 2025 GENERAL DYNAMICS ORD & TAC SYS / MARION, IL Option / FFP ROCK ISLAND ARSENAL, IL Jun 2025 Sep 2026 313,947 30.75 Y 2026 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 362,928 38.46 Y 2026 GENERAL DYNAMICS ORD & TAC SYS / MARION, IL Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 362,928 38.46 Y 2027 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 738,733 37.46 Y 2027 GENERAL DYNAMICS ORD & TAC SYS / MARION, IL Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 738,733 37.46 Y 2025 GENERAL DYNAMICS ORD & TAC SYS / MARION, IL Option / FFP ROCK ISLAND ARSENAL, IL May 2025 Jun 2026 139,481 40.18 Y RFP Issue Date indicates the presence of a P-21 LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 35 of 47 P-1 Line #8 Volume 1 - 240 === page 273 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E10100 / CTG, 30MM TP [B118] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND M788 TP Prior Years Deliveries: 26465856 1 2025 ARMY 122.091 .000 122.091 A - - - - - - - - - - - - - - - 2 2025 ARMY 313.947 .000 313.947 A - - - - - - - - - - - - - - - - 122.091 1 2026 ARMY 362.928 .000 362.928 A - - - - - - - 362.928 2 2026 ARMY 362.928 .000 362.928 A - - - - - - - 362.928 1 2027 ARMY 738.733 .000 738.733 2 2027 ARMY 738.733 .000 738.733 26.165 287.782 738.733 738.733 O C T LI 2938ER8120 - CTG, 30mm, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 36 of 47 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 241 === page 274 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E10100 / CTG, 30MM TP [B118] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND M788 TP Prior Years Deliveries: 26465856 1 2025 ARMY 122.091 2 2025 ARMY 313.947 .000 122.091 - 10.177 10.174 10.174 10.174 10.174 10.174 10.174 10.174 10.174 10.174 10.174 10.174 .000 1 2026 ARMY 362.928 .000 362.928 - - - - - 30.244 30.244 30.244 30.244 30.244 30.244 30.244 30.244 30.244 30.244 30.244 30.244 2 2026 ARMY 362.928 .000 362.928 - - - - - 30.244 30.244 30.244 30.244 30.244 30.244 30.244 30.244 30.244 30.244 30.244 30.244 1 2027 ARMY 738.733 .000 738.733 2 2027 ARMY 738.733 .000 738.733 26.165 287.782 26.162 26.162 26.162 26.162 26.162 26.162 26.162 26.162 26.162 26.162 26.162 A - - A O C T LI 2938ER8120 - CTG, 30mm, All Types Army N O V D E C J A N F E B M A R - A P R - M A Y - J U N - J U L .000 - A U G UNCLASSIFIED Page 37 of 47 - S E P - O C T - N O V - D E C J A N F E B P-1 Line #8 .000 .000 - 61.562 61.561 61.561 61.561 61.561 61.561 61.561 307.805 - 61.562 61.561 61.561 61.561 61.561 61.561 61.561 307.805 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 242 === page 275 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E10100 / CTG, 30MM TP [B118] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND M788 TP Prior Years Deliveries: 26465856 1 2025 ARMY 122.091 122.091 .000 .000 2 2025 ARMY 313.947 313.947 .000 .000 1 2026 ARMY 362.928 362.928 .000 .000 2 2026 ARMY 362.928 362.928 .000 .000 1 2027 ARMY 738.733 430.928 307.805 61.561 61.561 61.561 61.561 61.561 2 2027 ARMY 738.733 430.928 307.805 61.561 61.561 61.561 61.561 61.561 O C T LI 2938ER8120 - CTG, 30mm, All Types Army N O V D E C J A N F E B .000 .000 M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 38 of 47 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 243 === page 276 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Item Number / Title [DODIC]: E10100 / CTG, 30MM TP [B118] Production Rates (Each / Month) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 NORTHROP GRUMMAN SYSTEMS CORP PLYMOUTH, MN 1,000 120,000 200,000 6 6 12 18 6 6 12 18 2 GENERAL DYNAMICS ORD & TAC SYS - MARION, IL 1,000 120,000 200,000 6 6 12 18 6 6 12 18 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 39 of 47 P-1 Line #8 Volume 1 - 244 === page 277 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E10111 / CARTRIDGE, 30 MILLIMETER HIGH EXPLOSIVE PROXIMITY [AC61] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 85.859 6.504 34.219 - 34.219 - Gross/Weapon System Cost ($ in Millions) 159.346 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 159.346 Plus CY Advance Procurement ($ in Millions) - - - - - 85.859 6.504 34.219 - 34.219 - Total Obligation Authority ($ in Millions) 159.346 FY 2027 Total - - - - - 85.859 6.504 34.219 - 34.219 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Qty Total Cost 74,391 134.985 (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE ROUND XM1211 HEP (†) 1,814.54 COMPLETE ROUND 40,080 75.931 - - - 2,598.31 2,385 6.197 2,138.47 6,525 13.954 - - - 2,138.47 6,525 13.954 - - - 2,369.02 4,100 9.713 - - - 2,369.02 4,100 9.713 - - - - 134.985 - - 75.931 - - 6.197 - - 23.666 - - - - - 23.666 - - 134.985 - - 75.931 - - 6.197 - - 23.666 - - - - - 23.666 First Article Test - - - - - 4.928 - - - - - 8.000 - - - - - 8.000 Subtotal: Support Acceptance Testing Cost - - - - - 4.928 - - - - - 8.000 - - - - - 8.000 - - 11.154 - - 5.000 - - - - - - - - - - - - - - 11.154 - - 5.000 - - - - - - - - - - - - Production Engineering - - 13.201 - - - - - 0.306 - - 2.550 - - - - - 2.550 Subtotal: Support Production Engineering Cost - - 13.201 - - - - - 0.306 - - 2.550 - - - - - 2.550 - - 0.005 - - - - - 0.001 - - 0.003 - - - - - 0.003 (†) XM1223 MMPA Subtotal: Recurring Cost Subtotal: Hardware Cost - 1,894.49 Support - Acceptance Testing Cost Support - Non-Recurring Support Cost Facilitization Subtotal: Support - NonRecurring Support Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 40 of 47 P-1 Line #8 Volume 1 - 245 === page 278 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E10111 / CARTRIDGE, 30 MILLIMETER HIGH EXPLOSIVE PROXIMITY [AC61] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) Qty ($) FY 2027 Base Total Cost (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Subtotal: Support - Quality Assurance Cost - - 0.005 - - - - - 0.001 - - 0.003 - - - - - 0.003 Gross/Weapon System Cost - - 159.346 - - 85.859 - - 6.504 - - 34.219 - - - - - 34.219 Remarks: FY 2027 funding includes Base funding in support of the 30MM XM1223 Multi-Mode Proximity Airburst (MMPA) cartridge, which is a different version of the XM1211, in support of the Mobile Low, slow, small Intercept and Defeat System (MLIDS) and Initial Maneuver Short Range Air Defense (IM-SHORAD) ground vehicle platforms. Price differences for XM1211 HEP FY 2025 through FY 2027 are due to step ladder pricing matrices based on quantity ranges, as well as negotiated Economic Price Adjustments (EPA), and decisions to change the percentage executed between competing vendors determined during execution. FY 2027 is a production rate increase from FY 2026 to ramp up 30MM XM1223 MMPA production. (†) indicates the presence of a P-5a LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 41 of 47 P-1 Line #8 Volume 1 - 246 === page 279 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements COMPLETE ROUND XM1211 HEP (†) COMPLETE ROUND XM1211 HEP (†) COMPLETE ROUND XM1211 HEP (†) COMPLETE ROUND XM1223 MMPA (†) (†) O O C P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E10111 / CARTRIDGE, 30 MILLIMETER HIGH EXPLOSIVE PROXIMITY [AC61] Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP ROCK ISLAND ARSENAL, IL Jul 2025 Jul 2026 40,080 1,894.49 Y 2026 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 2,385 2,598.31 Y 2027 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 6,525 2,138.47 Y 2027 TO BE SELECTED / TO BE SELECTED C / FFP ROCK ISLAND ARSENAL, IL Jun 2027 Jun 2028 4,100 2,369.02 Y (Each) RFP Issue Date indicates the presence of a P-21 LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 42 of 47 P-1 Line #8 Volume 1 - 247 === page 280 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E10111 / CARTRIDGE, 30 MILLIMETER HIGH EXPLOSIVE PROXIMITY [AC61] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND XM1211 HEP Prior Years Deliveries: 74391 1 2025 ARMY 40.080 .000 40.080 - - - - 3.872 3.871 1 2026 ARMY 2.385 .000 2.385 A - - - - - - - - A - - - - - - 1.369 30.968 - 2.385 1 2026 MC (‡) 10.918 .000 10.918 A - - - - - - - 10.918 1 2026 Total 13.303 .000 13.303 - - - - - - - 13.303 1 2027 ARMY 6.525 .000 6.525 6.525 1 2027 MC (‡) 10.360 .000 10.360 10.360 1 2027 Total 16.885 .000 16.885 16.885 COMPLETE ROUND XM1223 MMPA 2 2027 ARMY 4.100 .000 4.100 4.100 O C T LI 2938ER8120 - CTG, 30mm, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 43 of 47 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 248 === page 281 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E10111 / CARTRIDGE, 30 MILLIMETER HIGH EXPLOSIVE PROXIMITY [AC61] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R B A L A N C E Fiscal Year 2028 A P R M A Y J U N Calendar Year 2028 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND XM1211 HEP Prior Years Deliveries: 74391 1 2025 ARMY 40.080 9.112 30.968 3.871 3.871 3.871 3.871 3.871 - 3.871 3.871 3.871 1 2026 ARMY 2.385 .000 2.385 - - - - - .207 .198 .198 .198 .198 .198 .198 .198 .198 .198 .198 .198 .000 1 2026 MC (‡) 10.918 .000 10.918 - - - - - .919 .909 .909 .909 .909 .909 .909 .909 .909 .909 .909 .909 1 2026 Total 13.303 .000 13.303 - - - - - 1.126 1.107 1.107 1.107 1.107 1.107 1.107 1.107 1.107 1.107 1.107 1.107 - - - - - - - .000 1 2027 ARMY 6.525 .000 6.525 A - - - - - - - - - - - - .550 .545 .543 .543 .543 .543 .543 2.715 1 2027 MC (‡) 10.360 .000 10.360 A - - - - - - - - - - - - .867 .863 .863 .863 .863 .863 .863 4.315 1 2027 Total 16.885 .000 16.885 - - - - - - - - - - - - 1.417 1.408 1.406 1.406 1.406 1.406 1.406 7.030 - .349 .341 .341 .341 2.728 J U N J U L A U G S E P .000 .000 COMPLETE ROUND XM1223 MMPA 2 2027 ARMY 4.100 .000 4.100 A O C T LI 2938ER8120 - CTG, 30mm, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 44 of 47 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y Volume 1 - 249 === page 282 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E10111 / CARTRIDGE, 30 MILLIMETER HIGH EXPLOSIVE PROXIMITY [AC61] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND XM1211 HEP Prior Years Deliveries: 74391 1 2025 ARMY 40.080 40.080 .000 .000 1 2026 ARMY 2.385 2.385 .000 .000 1 2026 MC (‡) 10.918 10.918 .000 1 2026 Total 13.303 13.303 .000 - - - - - 1 2027 ARMY 6.525 3.810 2.715 .543 .543 .543 .543 .543 1 2027 MC (‡) 10.360 6.045 4.315 .863 .863 .863 .863 .863 1 2027 Total 16.885 9.855 7.030 1.406 1.406 1.406 1.406 1.406 1.372 2.728 .000 - - - - - - - - - - - - - - - - - - - .000 .000 .000 - - - - - - - - - - - - - - - - - - - .000 COMPLETE ROUND XM1223 MMPA 2 2027 ARMY 4.100 .341 .341 .341 .341 .341 .341 .341 .341 O C T N O V D E C J A N F E B M A R A P R M A Y LI 2938ER8120 - CTG, 30mm, All Types Army .000 J U N J U L A U G UNCLASSIFIED Page 45 of 47 S E P O C T N O V D E C J A N F E B P-1 Line #8 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 250 === page 283 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Item Number / Title [DODIC]: E10111 / CARTRIDGE, 30 MILLIMETER HIGH EXPLOSIVE PROXIMITY [AC61] Production Rates (Each / Month) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 NORTHROP GRUMMAN SYSTEMS CORP PLYMOUTH, MN 300 10,000 18,000 6 6 12 18 6 6 12 18 2 TO BE SELECTED - TO BE SELECTED 300 10,000 18,000 9 9 12 21 6 6 12 18 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 46 of 47 P-1 Line #8 Volume 1 - 251 === page 284 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2938ER8120 / CTG, 30mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E91122 / CTG, 30MM C-UAS HE PROXIMITY FUSE [AD10] MDAP/MAIS Code: FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - - Gross/Weapon System Cost ($ in Millions) - - 0.887 - - - Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - 0.887 - - - Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - 0.887 - - - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Support - Production Engineering Cost Production Engineering - - - - - - - - 0.887 - - - - - - - - - Subtotal: Support Production Engineering Cost - - - - - - - - 0.887 - - - - - - - - - Gross/Weapon System Cost - - - - - - - - 0.887 - - - - - - - - - LI 2938ER8120 - CTG, 30mm, All Types Army UNCLASSIFIED Page 47 of 47 P-1 Line #8 Volume 1 - 252 === page 285 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition P-1 Line Item Number / Title: 3222ER8001 / CTG, 40mm, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 1,288.716 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 1,288.716 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 1,288.716 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 151.217 151.217 151.217 131.432 131.432 131.432 146.105 - - 146.105 - - 146.105 - 146.105 146.105 146.105 148.891 148.891 148.891 151.871 151.871 151.871 154.629 154.629 154.629 To FY 2031 Complete 156.600 156.600 156.600 Total - 2,329.461 - 2,329.461 - 2,329.461 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line includes 40MM ALL TYPES: (E05610) CTG 40mm M781E1 Low Velocity Day Night Thermal cartridge is a training cartridge for the M203 and M320 Grenade Launchers. This ammunition consists of a projectile assembly and cartridge case assembly. The projectile ogive is filled with a signature material that provides a signature upon impact that can be seen day or night with the unaided eye and thermal and night vision weapon sights. The cartridge does not contain any fuzing or explosives, eliminating unexploded ordnance issues on the training ranges due to non-functioning training ammunition. This item is Code B, not approved for service use. (E05611) CTG 40mm M918E2 High Velocity Day Night Thermal cartridge is a training cartridge for the MK19 Grenade Machine Gun. This ammunition consists of a projectile assembly and cartridge case assembly. The projectile is filled with a signature material that provides a signature upon impact that can be seen day or night with the unaided eye and thermal and night vision weapon sights. The cartridge does not contain any fuzing or explosives, eliminating unexploded ordnance issues on the training ranges due to non-functioning training ammunition. This item is Code B, not approved for service use. (E12601) CTG 40mm Low Velocity M433E1 is a High Explosive Dual Purpose (HEDP) cartridge fired from the M320 Grenade Launcher to a max range of 400 meters. The M433E1 cartridge consists of a steel body with tungsten pellets with a Comp A5 high explosive charge, Point Initiating Base Detonating (PIBD) fuze assembly with a Spitback charge, copper shaped-charge liner, and aluminum cartridge case. Upon impact, detonation of the Comp A5 causes fragmentation of the projectile body on the target and forms an armor piercing jet created by the copper shaped-charge liner, which is capable of penetrating a minimum of two inches of Rolled Homogeneous Armor (RHA) plate. This item is Code B, not approved for service use. (E70505) CTG 40mm High Velocity (HV) High Explosive Dual Purpose - Air burst (HEDP-AB) XM1176 cartridge is a new capability that will provide the Mk19 Mod 3 Grenade Machine Gun (GMG) an air burst capable cartridge with the ability of achieving required lethal effects against enemy targets in the open and in defilade, while maintaining the capability to defeat unarmored and lightly armored vehicles. The XM1176 HEDP-AB cartridges are manufactured by de-fuzing legacy M430A1 cartridges and installing a new airburst capable fuze onto the M430A1 warhead. This item is Code B, not approved for service use. (E71005) CTG 40mm Low Velocity High Explosive Air Burst (HEAB) XM1166 cartridge is a new capability that addresses a counter-defilade capability gap and allows the Warfighter to engage targets at increased effective ranges using the 40mm M320 Grenade Launcher. The HEAB cartridge provides the grenadier with a higher probability of achieving a first shot kill against enemy personnel, coupled with the ability to defeat personnel targets in defilade positions. When deployed against point and area targets, the cartridge inflicts incapacitating effects against personnel beyond those offered by the current M433 High Explosive Dual Purpose (HEDP) cartridge. The cartridge provides lethal effects against targets with improved accuracy and greater standoff ranges resulting in increased soldier survivability. This item is Code B, not approved for service use. LI 3222ER8001 - CTG, 40mm, All Types Army UNCLASSIFIED Page 1 of 25 P-1 Line #9 Volume 1 - 253 === page 286 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition P-1 Line Item Number / Title: 3222ER8001 / CTG, 40mm, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 E05610 / CTG, 40MM LV TP-DNT [BA54] P-5a, P-21 B - / 95.340 P-5 E05611 / CTG, 40MM HV TP-DNT [BA67] P-5a, P-21 B - / 360.985 P-5 E12601 / CTG, 40MM LV HEDP P-5a, P-21 B - / 772.965 - / 7.507 - / 6.966 P-5 E70505 / CTG, 40MM HV HEDP-AB [BA58] P-5a B - / 45.546 - / 13.926 - / 0.079 - P-5 E71005 / CTG, 40MM LV HEAB [BZ16] P-5a B - / 13.880 - / 6.934 / - - P-40 Total Gross/Weapon System Cost - / 1,288.716 - - / 7.880 - / 13.333 - / 24.988 - / - - / 24.988 / 114.970 - / 111.054 - / 113.966 - / - - / 113.966 / 7.151 - / - / - - / - - / - - / - - / 146.105 - / - / 151.217 - / 131.432 - - - - / 7.151 / / / 146.105 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 base budget supports critical Army Title 10 war reserve/operational, training, and test requirements in accordance with DoDI 3000.04 (Munitions Requirements Process) and AR 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War (OSW)-approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life-cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. FY 2027 Total Base procurement dollars in the amount of $146.105 million support procurement of 2.593 million cartridges. (E05610) CTG 40mm M781E1 Low Velocity Day Night Thermal is a training unique item not used in combat. The FY 2027 request supports annual training and builds a depot level in accordance with Army's procurement goals. FY 2027 Base Procurement dollars in the amount of $24.988 million support the procurement of 0.989 million cartridges. Type classification date: 31 May 2017, Limited Procurement (E05611) CTG 40mm M918E2 High Velocity Day Night Thermal is a training unique item not used in combat. The FY 2027 request supports annual training and builds a depot level in accordance with Army's procurement goals. FY 2027 Base Procurement dollars in the amount of $113.966 million support the procurement of 1.581 million cartridges. Type classification date: 2025 (E12601) CTG 40mm Low Velocity M433E1 is a training standard item used in both training and combat. The FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base Procurement dollars in the amount of $7.151 million support the procurement of 0.023 million cartridges. Type classification date: PENDING (E70505) CTG 40mm High Velocity (HV) High Explosive Dual Purpose - Air burst (HEDP-AB) XM1176 is a training standard item used in both training and combat. There is no FY 2027 budget request for this item. Type classification date: 31 March 2025, Limited Procurement LI 3222ER8001 - CTG, 40mm, All Types Army UNCLASSIFIED Page 2 of 25 P-1 Line #9 Volume 1 - 254 === page 287 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 3222ER8001 / CTG, 40mm, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A (E71005) CTG 40mm Low Velocity High Explosive Air Burst (HEAB) XM1166 is a training standard item used in both training and combat. There is no FY 2027 budget request for this item. Type classification date: PENDING LI 3222ER8001 - CTG, 40mm, All Types Army UNCLASSIFIED Page 3 of 25 P-1 Line #9 Volume 1 - 255 === page 288 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3222ER8001 / CTG, 40mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E05610 / CTG, 40MM LV TP-DNT [BA54] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 95.340 7.880 13.333 24.988 - 24.988 - - - - - - 95.340 7.880 13.333 24.988 - 24.988 - - - - - - 95.340 7.880 13.333 24.988 - 24.988 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Qty ($) FY 2025 Total Cost (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 11.29 Subtotal: Recurring Cost - ROUND Subtotal: Hardware Cost 6,808,348 76.832 21.95 79,539 1.746 21.95 - 76.832 - - 1.746 - - 76.832 - - 1.746 - - - - - - 4.838 - - - - - 515,388 11.313 22.40 - 11.313 - - 11.313 - - - - 4.838 - - 989,450 22.164 - - - 22.40 989,450 22.164 - 22.164 - - - - - 22.164 - 22.164 - - - - - 22.164 - - - - - - - - - - - - - - - - - - - Support - Product Improvement Cost Reliability Subtotal: Support - Product Improvement Cost Support - Production Engineering Cost Production Engineering - - 18.508 - - 1.296 - - 2.020 - - 2.824 - - - - - 2.824 Subtotal: Support Production Engineering Cost - - 18.508 - - 1.296 - - 2.020 - - 2.824 - - - - - 2.824 Gross/Weapon System Cost - - 95.340 - - 7.880 - - 13.333 - - 24.988 - - - - - 24.988 Remarks: FY 2027 is a production rate increase from FY 2026 to meet training requirements due to lower starting inventory from prior years of undelivered quantity. New contract award delaying restart to production. (†) indicates the presence of a P-5a LI 3222ER8001 - CTG, 40mm, All Types Army UNCLASSIFIED Page 4 of 25 P-1 Line #9 Volume 1 - 256 === page 289 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 3222ER8001 / CTG, 40mm, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E05610 / CTG, 40MM LV TP-DNT [BA54] Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 TO BE SELECTED / TO BE SELECTED C / FFP PICATINNY ARSENAL, NJ Mar 2026 Jul 2027 79,539 21.95 Y 2026 TO BE SELECTED / TO BE SELECTED C / FFP PICATINNY ARSENAL, NJ Mar 2026 Jul 2027 515,388 21.95 Y 2027 TO BE SELECTED / TO BE SELECTED Option / FFP PICATINNY ARSENAL, NJ Mar 2027 Jul 2028 989,450 22.40 Y (Each) RFP Issue Date indicates the presence of a P-21 LI 3222ER8001 - CTG, 40mm, All Types Army UNCLASSIFIED Page 5 of 25 P-1 Line #9 Volume 1 - 257 === page 290 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3222ER8001 / CTG, 40mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E05610 / CTG, 40MM LV TP-DNT [BA54] Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R J U L A U G S E P B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N COMPLETE ROUND Prior Years Deliveries: 6808348 1 2025 ARMY .080 .000 .080 A - - - - - - - - - - - - - - - - .007 .007 .007 .060 1 2026 ARMY .515 .000 .515 A - - - - - - - - - - - - - - - - .043 .043 .043 .387 1 2027 AF (‡) .062 .000 .062 A - - - - - - - .062 1 2027 ARMY .989 .000 .989 A - - - - - - - .989 1 2027 Total 1.052 .000 1.052 - - - - - - - 1.052 O C T LI 3222ER8001 - CTG, 40mm, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #9 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 258 === page 291 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3222ER8001 / CTG, 40mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E05610 / CTG, 40MM LV TP-DNT [BA54] Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT B A L A N C E Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 6808348 1 2025 ARMY .080 .020 .060 .007 .007 .007 .007 .007 .007 .007 .007 .007 1 2026 ARMY .515 .129 .387 .043 .043 .043 .043 .043 .043 .043 .043 .043 1 2027 AF (‡) .062 .000 .062 - - - - - - - - - .005 .005 .005 .005 .005 .005 .005 .005 .005 .005 .005 .005 1 2027 ARMY .989 .000 .989 - - - - - - - - - .082 .082 .082 .082 .082 .082 .082 .082 .082 .082 .082 .082 1 2027 Total 1.052 .000 1.052 - - - - - - - - - .088 .088 .088 .088 .088 .088 .088 .088 .088 .088 .088 .088 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N O C T LI 3222ER8001 - CTG, 40mm, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N .000 .000 UNCLASSIFIED Page 7 of 25 P-1 Line #9 .000 .000 J U L A U G - .000 S E P Volume 1 - 259 === page 292 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3222ER8001 / CTG, 40mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Item Number / Title [DODIC]: E05610 / CTG, 40MM LV TP-DNT [BA54] Production Rates (Each / Month) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 TO BE SELECTED - TO BE SELECTED MSR For 2027 1-8-5 For 2027 MAX For 2027 50,000 125,000 375,000 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 6 16 Total After Oct 1 ALT Prior to Oct 1 22 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 16 22 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 3222ER8001 - CTG, 40mm, All Types Army UNCLASSIFIED Page 8 of 25 P-1 Line #9 Volume 1 - 260 === page 293 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3222ER8001 / CTG, 40mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E05611 / CTG, 40MM HV TP-DNT [BA67] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) - 360.985 Less PY Advance Procurement ($ in Millions) 114.970 - Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) 113.966 - - - 111.054 113.966 - 113.966 - 114.970 FY 2027 Total - - 111.054 - 360.985 - - 114.970 - Total Obligation Authority ($ in Millions) FY 2027 OOC - 111.054 - 360.985 FY 2027 Base - 113.966 - 113.966 - - 113.966 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Qty ($) FY 2025 Total Cost (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 25.29 Subtotal: Recurring Cost - ROUND Subtotal: Hardware Cost 11,951,356 302.274 53.47 - 302.274 - - 302.274 - 2,017,468 107.874 61.66 - 107.874 - - 107.874 - 1,664,855 102.655 67.26 - 102.655 - - 102.655 - 1,581,401 106.365 - - - 67.26 1,581,401 106.365 - 106.365 - - - - - 106.365 - 106.365 - - - - - 106.365 Support - Production Engineering Cost Production Engineering - - 58.711 - - 7.096 - - 8.399 - - 7.601 - - - - - 7.601 Subtotal: Support Production Engineering Cost - - 58.711 - - 7.096 - - 8.399 - - 7.601 - - - - - 7.601 Gross/Weapon System Cost - - 360.985 - - 114.970 - - 111.054 - - 113.966 - - - - - 113.966 Remarks: Price differences FY 2025 through FY 2027 are due to step ladder pricing matrices based on quantity ranges, as well as negotiated Economic Price Adjustments (EPA). (†) indicates the presence of a P-5a LI 3222ER8001 - CTG, 40mm, All Types Army UNCLASSIFIED Page 9 of 25 P-1 Line #9 Volume 1 - 261 === page 294 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 3222ER8001 / CTG, 40mm, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E05611 / CTG, 40MM HV TP-DNT [BA67] Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 AMTEC CORPORATION / JANESVILLE, WI Option / FFP PICATINNY ARSENAL, NJ Jan 2026 Mar 2027 2,017,468 53.47 Y 2026 AMTEC CORPORATION / JANESVILLE, WI Option / FFP PICATINNY ARSENAL, NJ Mar 2026 Jul 2027 1,664,855 61.66 Y 2027 AMTEC CORPORATION / JANESVILLE, WI Option / FFP PICATINNY ARSENAL, NJ Mar 2027 Jul 2028 1,581,401 67.26 Y RFP Issue Date indicates the presence of a P-21 LI 3222ER8001 - CTG, 40mm, All Types Army UNCLASSIFIED Page 10 of 25 P-1 Line #9 Volume 1 - 262 === page 295 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3222ER8001 / CTG, 40mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E05611 / CTG, 40MM HV TP-DNT [BA67] Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 11951356 1 2025 ARMY 2.017 .000 2.017 A - - - - - - - - - - - - - - .168 .168 .168 .168 .168 .168 .168 .841 1 2025 MC (‡) .559 .000 .559 A - - .047 .047 .047 .047 .047 .047 .047 .047 .047 .047 .047 .047 - - - - - - - .000 1 2025 Total 2.577 .000 2.577 - - .047 .047 .047 .047 .047 .047 .047 .047 .047 .047 .047 .047 .168 .168 .168 .168 .168 .168 .168 .841 1 2026 ARMY 1.665 .000 1.665 A - - - - - - - - - - - - - - - - .139 .139 .139 1.249 1 2026 MC (‡) .247 .000 .247 A - - - - - - - - - - - - - - - - .021 .021 .021 .185 1 2026 Total 1.912 .000 1.912 - - - - - - - - - - - - - - - - .159 .159 .159 1.434 1 2027 ARMY 1.581 .000 1.581 - 1.581 A O C T LI 3222ER8001 - CTG, 40mm, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #9 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 263 === page 296 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3222ER8001 / CTG, 40mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Millions, * = < 500) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E05611 / CTG, 40MM HV TP-DNT [BA67] Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 11951356 1 2025 ARMY 2.017 1.177 .841 .168 .168 .168 .168 .168 1 2025 MC (‡) .559 .559 .000 - - - - - 1 2025 Total 2.577 1.736 .841 .168 .168 .168 .168 .168 - - - - 1 2026 ARMY 1.665 .416 1.249 .139 .139 .139 .139 .139 .139 .139 .139 .139 1 2026 MC (‡) .247 .062 .185 .021 .021 .021 .021 .021 .021 .021 .021 .021 1 2026 Total 1.912 .478 1.434 .159 .159 .159 .159 .159 .159 .159 .159 .159 - - - - - - - - - - - - 1 2027 ARMY 1.581 .000 1.581 - - - - - - - - - .132 .132 .132 .132 .132 .132 .132 .132 .132 .132 .132 .132 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N O C T LI 3222ER8001 - CTG, 40mm, All Types Army N O V D E C J A N F E B .000 .000 M A R A P R M A Y J U N - - - - - - - - - - - - - - - .000 .000 .000 UNCLASSIFIED Page 12 of 25 P-1 Line #9 - - - .000 .000 J U L A U G S E P Volume 1 - 264 === page 297 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3222ER8001 / CTG, 40mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Item Number / Title [DODIC]: E05611 / CTG, 40MM HV TP-DNT [BA67] Production Rates (Each / Month) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 AMTEC CORPORATION JANESVILLE, WI MSR For 2027 1-8-5 For 2027 MAX For 2027 200,000 3,000,000 5,500,000 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 6 16 Total After Oct 1 ALT Prior to Oct 1 22 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 16 22 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 3222ER8001 - CTG, 40mm, All Types Army UNCLASSIFIED Page 13 of 25 P-1 Line #9 Volume 1 - 265 === page 298 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3222ER8001 / CTG, 40mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E12601 / CTG, 40MM LV HEDP MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 7.507 6.966 7.151 - 7.151 - Gross/Weapon System Cost ($ in Millions) 772.965 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 772.965 Plus CY Advance Procurement ($ in Millions) - - - - - 7.507 6.966 7.151 - 7.151 - Total Obligation Authority ($ in Millions) 772.965 FY 2027 Total - - - - - 7.507 6.966 7.151 - 7.151 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost CTG 40MM HEDP (†) 80.32 8,923,863 716.720 164.77 39,454 CTG 40MM HEDP M433 69.52 453,528 Subtotal: Recurring Cost - - 31.529 - 748.249 - - - 748.249 Acceptance Test - Subtotal: Support Acceptance Testing Cost - - Production Engineering Subtotal: Support Production Engineering Cost M433E1 Subtotal: Hardware Cost 6.501 204.68 29,107 5.958 243.05 22,533 5.477 - - - 243.05 22,533 - - - - 6.501 - - - - - 5.958 - - - 6.501 - - 5.958 2.976 - - - - - - 2.976 - - - - - - 21.681 - - 1.002 - - 21.681 - - 5.477 - - - - - - - - - 5.477 - - - - - 5.477 - - 5.477 - - - - - 5.477 - - - 0.504 - - - - - 0.504 - - - - 0.504 - - - - - 0.504 - - 1.003 - - 1.164 - - - - - 1.164 1.002 - - 1.003 - - 1.164 - - - - - 1.164 Support - Acceptance Testing Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.058 - - 0.005 - - 0.005 - - 0.006 - - - - - 0.006 Subtotal: Support - Quality Assurance Cost - - 0.058 - - 0.005 - - 0.005 - - 0.006 - - - - - 0.006 Gross/Weapon System Cost - - 772.965 - - 7.507 - - 6.966 - - 7.151 - - - - - 7.151 Remarks: LI 3222ER8001 - CTG, 40mm, All Types Army UNCLASSIFIED Page 14 of 25 P-1 Line #9 Volume 1 - 266 === page 299 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 P-1 Line Item Number / Title: 3222ER8001 / CTG, 40mm, All Types ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E12601 / CTG, 40MM LV HEDP MDAP/MAIS Code: The price difference from FY 2025 to FY 2026 is due to the FY 2025 consolidated procurement with prior year funding for a higher quantity at a lower price. The FY 2027 price includes new contract risk, as well as Economic Price Adjustments (EPA). (†) indicates the presence of a P-5a LI 3222ER8001 - CTG, 40mm, All Types Army UNCLASSIFIED Page 15 of 25 P-1 Line #9 Volume 1 - 267 === page 300 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 O O C Cost Elements (†) CTG 40MM HEDP M433E1 (†) CTG 40MM HEDP M433E1 (†) CTG 40MM HEDP M433E1 (†) P-1 Line Item Number / Title: 3222ER8001 / CTG, 40mm, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E12601 / CTG, 40MM LV HEDP Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 AMTEC CORPORATION / JANESVILLE, WI Option / FFP ROCK ISLAND ARSENAL, IL Jul 2025 Jun 2027 39,454 164.77 Y 2026 AMTEC CORPORATION / JANESVILLE, WI Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Aug 2027 29,107 204.68 Y 2027 TO BE SELECTED / TBS C / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Oct 2028 22,533 243.05 Y (Each) RFP Issue Date indicates the presence of a P-21 LI 3222ER8001 - CTG, 40mm, All Types Army UNCLASSIFIED Page 16 of 25 P-1 Line #9 Volume 1 - 268 === page 301 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3222ER8001 / CTG, 40mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E12601 / CTG, 40MM LV HEDP Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P CTG 40MM HEDP M433E1 Prior Years Deliveries: 8923863 1 2025 ARMY 39.454 .000 39.454 1 2026 ARMY 29.107 .000 29.107 2 2027 ARMY 22.533 .000 22.533 A - - - - - - - - - - - - - - - 39.454 A - - - - - - - 29.107 22.533 O C T LI 3222ER8001 - CTG, 40mm, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #9 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 269 === page 302 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3222ER8001 / CTG, 40mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E12601 / CTG, 40MM LV HEDP Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P CTG 40MM HEDP M433E1 Prior Years Deliveries: 8923863 1 2025 ARMY 39.454 .000 39.454 - - - - - - - - 3.297 3.287 3.287 3.287 3.287 3.287 3.287 3.287 3.287 3.287 3.287 3.287 1 2026 ARMY 29.107 .000 29.107 - - - - - - - - - - 2.432 2.425 2.425 2.425 2.425 2.425 2.425 2.425 2.425 2.425 2.425 2.425 2 2027 ARMY 22.533 .000 22.533 A - - - - - - - - - - - - - - - - - O C T LI 3222ER8001 - CTG, 40mm, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 18 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #9 M A R A P R M A Y .000 J U N J U L .000 A U G - 22.533 S E P Volume 1 - 270 === page 303 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3222ER8001 / CTG, 40mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E12601 / CTG, 40MM LV HEDP Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E CTG 40MM HEDP M433E1 Prior Years Deliveries: 8923863 1 2025 ARMY 39.454 39.454 .000 1 2026 ARMY 29.107 29.107 .000 2 2027 ARMY 22.533 .000 22.533 .000 .000 1.886 1.877 1.877 1.877 1.877 1.877 1.877 1.877 1.877 1.877 1.877 1.877 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LI 3222ER8001 - CTG, 40mm, All Types Army UNCLASSIFIED Page 19 of 25 .000 O C T N O V D E C J A N F E B P-1 Line #9 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 271 === page 304 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3222ER8001 / CTG, 40mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Item Number / Title [DODIC]: E12601 / CTG, 40MM LV HEDP Production Rates (Each / Month) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 AMTEC CORPORATION JANESVILLE, WI 20,000 35,000 80,000 6 6 19 25 6 6 17 23 2 TO BE SELECTED - TBS 20,000 35,000 60,000 6 6 19 25 6 6 17 23 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 3222ER8001 - CTG, 40mm, All Types Army UNCLASSIFIED Page 20 of 25 P-1 Line #9 Volume 1 - 272 === page 305 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3222ER8001 / CTG, 40mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E70505 / CTG, 40MM HV HEDP-AB [BA58] MDAP/MAIS Code: Resource Summary Prior Years FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - - Gross/Weapon System Cost ($ in Millions) 45.546 13.926 0.079 - - - Less PY Advance Procurement ($ in Millions) - - - - - - 45.546 13.926 0.079 - - - - - - - - - 45.546 13.926 0.079 - - - Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost FY 2025 Total Cost Qty ($) (Each) ($ M) (†) 189.15 158,469 Subtotal: Recurring Cost - Engineering Data Subtotal: Support - Data Cost Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE 29.974 438.12 28,070 12.298 - - - - - - - - - - - - - 29.974 - - 12.298 - - - - - - - - - - - - - 29.974 - - 12.298 - - - - - - - - - - - - - - 4.000 - - - - - - - - - - - - - - - - - 4.000 - - - - - - - - - - - - - - - Production Engineering - - 11.272 - - 1.628 - - 0.079 - - - - - - - - - Subtotal: Support Production Engineering Cost - - 11.272 - - 1.628 - - 0.079 - - - - - - - - - ROUND Subtotal: Hardware Cost Support - Data Cost Support - Production Engineering Cost Support - Undistributed Procurement Cost Undistributed Procurement - - 0.300 - - - - - - - - - - - - - - - Subtotal: Support Undistributed Procurement Cost - - 0.300 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 45.546 - - 13.926 - - 0.079 - - - - - - - - - LI 3222ER8001 - CTG, 40mm, All Types Army UNCLASSIFIED Page 21 of 25 P-1 Line #9 Volume 1 - 273 === page 306 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 P-1 Line Item Number / Title: 3222ER8001 / CTG, 40mm, All Types ID Code (A=Service Ready, B=Not Service Ready) : B (†) Item Number / Title [DODIC]: E70505 / CTG, 40MM HV HEDP-AB [BA58] MDAP/MAIS Code: indicates the presence of a P-5a LI 3222ER8001 - CTG, 40mm, All Types Army UNCLASSIFIED Page 22 of 25 P-1 Line #9 Volume 1 - 274 === page 307 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements COMPLETE ROUND O O C P-1 Line Item Number / Title: 3222ER8001 / CTG, 40mm, All Types FY Contractor and Location Method/Type or Funding Vehicle 2025 RDZM, LLC / MIDDLETOWN, IA Option / FFP LI 3222ER8001 - CTG, 40mm, All Types Army Location of PCO PICATINNY ARSENAL, NJ UNCLASSIFIED Page 23 of 25 Item Number / Title [DODIC]: E70505 / CTG, 40MM HV HEDP-AB [BA58] Award Date Date of First Delivery Mar 2026 Aug 2028 P-1 Line #9 Qty (Each) 28,070 Specs Date Unit Cost Avail Revision Now? Available ($) 438.12 RFP Issue Date Y Volume 1 - 275 === page 308 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3222ER8001 / CTG, 40mm, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E71005 / CTG, 40MM LV HEAB [BZ16] MDAP/MAIS Code: Resource Summary Prior Years FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - - Gross/Weapon System Cost ($ in Millions) 13.880 6.934 - - - - Less PY Advance Procurement ($ in Millions) - - - - - - 13.880 6.934 - - - - - - - - - - 13.880 6.934 - - - - Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) - - - 325.12 18,536 6.026 - - - - - - - - - - - - Subtotal: Recurring Cost - - - - - 6.026 - - - - - - - - - - - - - - - - - 6.026 - - - - - - - - - - - - ROUND Subtotal: Hardware Cost Support - Production Engineering Cost Production Engineering - - 13.880 - - 0.908 - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - 13.880 - - 0.908 - - - - - - - - - - - - Gross/Weapon System Cost - - 13.880 - - 6.934 - - - - - - - - - - - - (†) indicates the presence of a P-5a LI 3222ER8001 - CTG, 40mm, All Types Army UNCLASSIFIED Page 24 of 25 P-1 Line #9 Volume 1 - 276 === page 309 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements COMPLETE ROUND O O C P-1 Line Item Number / Title: 3222ER8001 / CTG, 40mm, All Types FY Contractor and Location Method/Type or Funding Vehicle 2025 TO BE SELECTED / TBS01 C / FFP LI 3222ER8001 - CTG, 40mm, All Types Army Location of PCO PICATINNY ARSENAL, NJ UNCLASSIFIED Page 25 of 25 Item Number / Title [DODIC]: E71005 / CTG, 40MM LV HEAB [BZ16] Award Date Date of First Delivery Mar 2026 Sep 2027 P-1 Line #9 Qty (Each) 18,536 Specs Date Unit Cost Avail Revision Now? Available ($) 325.12 RFP Issue Date Y Volume 1 - 277 === page 310 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition P-1 Line Item Number / Title: 8030E80010 / CTG, 50MM, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - 28.000 20.006 42.131 58.221 - 58.221 53.467 58.879 58.535 59.117 - Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) - - - - - - - - - - - 28.000 20.006 42.131 58.221 - 58.221 53.467 58.879 58.535 59.117 - Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) To FY 2031 Complete - - - - - - - - - - - 28.000 20.006 42.131 58.221 - 58.221 53.467 58.879 58.535 59.117 - Total 378.356 378.356 378.356 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This line includes CARTRIDGE, 50MM, ALL TYPES (E80011) 50mm x 228 XM1202 Target Practice with Tracer (TP-T) cartridge is a developmental training cartridge designed to be a low-cost training cartridge with ballistic match to the developmental XM1204 High Explosive Airburst with Tracer (HEAB-T) cartridge. The XM1202 TP-T consists of an inert steel and aluminum projectile with glass reinforced Ultem rotating band, pyrotechnic tracer, double base or extruded propellant, an M36A2 percussion primer, and steel cartridge case. The XM1202 is planned to be packed 10 cartridges to a PA191 ammunition container. Used a FY 2019 Defense Ordnance Technology Consortium (DOTC) Middle Tier Acquisition- Rapid Prototyping (MTA-RP) program to support the XM30 Mechanized Infantry Combat Vehicle (MICV) program and transition to Milestone C in Quarter three FY 2024 and Low-Rate Initial Production in Quarter four FY 2024. These items are Code B, not approved for service use. (E80013) 50mm x 228 XM1203 Armor Piercing Fin Stabilized Discarding Sabot with Tracer (APFSDS-T) cartridge is a developmental anti-materiel cartridge designed to defeat near peer pacing and future vehicle threats. The XM1203 APFSDS-T consists of an aluminum sabot set, depleted uranium penetrator, stainless steel fin, plastic obturator band, pyrotechnic tracer, double base propellant, an M36A2 percussion primer, and steel cartridge case. The XM1203 is planned to be packed 10 cartridges to a PA191 ammunition container. Uses a FY 2019 Defense Ordnance Technology Consortium (DOTC) Middle Tier Acquisition- Rapid Prototyping (MTA-RP) program to support the XM30 Mechanized Infantry Combat Vehicle (MICV) program and transition to Milestone C in Quarter three FY 2026 and Low-Rate Initial Production in Quarter four FY 2026. These items are Code B, not approved for service use. (E80012) 50mm x 228 XM1204 High Explosive Airburst with Tracer (HEAB-T) cartridge is a developmental multipurpose anti-personnel tactical cartridge mean to service personnel targets in the open, in defilade, and within urban structures. The XM1204 HEAB-T consists of a titanium and steel with preformed fragments body, glass reinforced Ultem rotating band, multi-mode electro-mechanical programmable contact set fuze, pyrotechnic tracer, double base or extruded propellant, an M36A2 percussion primer, and steel cartridge case. The XM1204 is planned to be packed 10 cartridges to a PA191 ammunition container. Uses a FY 2019 Defense Ordnance Technology Consortium (DOTC) Middle Tier Acquisition- Rapid Prototyping (MTA-RP) program to support the Optionally Manned Fighting Vehicle (OMFV) program and transition to Milestone C in Quarter two FY 2027 and Low Rate Initial Production in Quarter three FY 2027. These items are Code B, not approved for service use. LI 8030E80010 - CTG, 50MM, All Types Army UNCLASSIFIED Page 1 of 16 P-1 Line #10 Volume 1 - 278 === page 311 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 30: Small/ Medium Cal Ammunition P-1 Line Item Number / Title: 8030E80010 / CTG, 50MM, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD B P-5 E80011 / CARTRIDGE, 50 MILLIMETER TP-T P-5a P-5 E80012 / CARTRIDGE, 50 MILLIMETER HEAB-T P-5a, P-21 P-5 E80013 / CARTRIDGE, 50 MILLIMETER APFSDS-T P-5a, P-21 P-40 Total Gross/Weapon System Cost MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 28.000 - - - / / / 28.000 / 20.006 - - - / - - / 5.329 - / 4.595 - / - - / 4.595 / - - / 42.517 - / - - / 42.517 / - - / 36.802 - / 11.109 - / - - / 11.109 / 20.006 - / 42.131 - / 58.221 - / - - / 58.221 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 base budget supports critical Army Title 10 war reserve/operational, training, and test requirements in accordance with DoDI 3000.04 (Munitions Requirements Process) and AR 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War (OSW)-approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life-cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. FY 2027 Total Base dollars in the amount of $58.221 million supports the procurement of 0.014 million cartridges. (E80011) XM1202 (TP-T) This is a training unique item not used in combat. FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base Procurement dollars in the amount of $4.595 million supports the procurement of 0.001 million cartridges. Type Classification Date: Pending. (E80012) XM1204 (HEAB-T) This is a war reserve item used in combat. FY 2027 request builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base Procurement dollars in the amount of $42.517 million supports the procurement of 0.008 million cartridges. E80012 is a new start in FY 2027. Type Classification Date: Pending. (E80013) XM1203 (APFSDS-T) This is a war reserve item used in combat. FY 2027 request builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base Procurement dollars in the amount of $11.109 million supports the procurement of 0.005 million cartridges. Type Classification Date: Pending. LI 8030E80010 - CTG, 50MM, All Types Army UNCLASSIFIED Page 2 of 16 P-1 Line #10 Volume 1 - 279 === page 312 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8030E80010 / CTG, 50MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E80011 / CARTRIDGE, 50 MILLIMETER TP-T MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 28.000 20.006 5.329 4.595 - 4.595 - - - - - - 28.000 20.006 5.329 4.595 - 4.595 - - - - - - 28.000 20.006 5.329 4.595 - 4.595 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost (†) 473.74 57,181 27.089 473.74 40,332 19.107 687.67 2,391 1.644 582.81 1,344 0.783 - - - 582.81 1,344 0.783 - - 27.089 - - 19.107 - - 1.644 - - 0.783 - - - - - 0.783 - - 27.089 - - 19.107 - - 1.644 - - 0.783 - - - - - 0.783 Acceptance Test - - - - - - - - - - - 2.210 - - - - - 2.210 Subtotal: Support Acceptance Testing Cost - - - - - - - - - - - 2.210 - - - - - 2.210 Production Engineering - - 0.911 - - 0.899 - - 3.679 - - 1.597 - - - - - 1.597 Subtotal: Support Production Engineering Cost - - 0.911 - - 0.899 - - 3.679 - - 1.597 - - - - - 1.597 Complete Round Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - - - - - - - 0.006 - - 0.005 - - - - - 0.005 Subtotal: Support - Quality Assurance Cost - - - - - - - - 0.006 - - 0.005 - - - - - 0.005 Gross/Weapon System Cost - - 28.000 - - 20.006 - - 5.329 - - 4.595 - - - - - 4.595 Remarks: The price difference between FY 2025 and FY 2026 is due to lower demand resulting in a lower quantity for a higher price range on the step ladder pricing matrix. LI 8030E80010 - CTG, 50MM, All Types Army UNCLASSIFIED Page 3 of 16 P-1 Line #10 Volume 1 - 280 === page 313 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 P-1 Line Item Number / Title: 8030E80010 / CTG, 50MM, All Types ID Code (A=Service Ready, B=Not Service Ready) : B (†) Item Number / Title [DODIC]: E80011 / CARTRIDGE, 50 MILLIMETER TP-T MDAP/MAIS Code: indicates the presence of a P-5a LI 8030E80010 - CTG, 50MM, All Types Army UNCLASSIFIED Page 4 of 16 P-1 Line #10 Volume 1 - 281 === page 314 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements Complete Round Complete Round Complete Round Complete Round O O C P-1 Line Item Number / Title: 8030E80010 / CTG, 50MM, All Types Method/Type or Funding Vehicle Item Number / Title [DODIC]: E80011 / CARTRIDGE, 50 MILLIMETER TP-T Location of PCO Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 GENERAL DYNAMICS ORD & TAC / MARION, IL C / FPEPA ACC Rock Island, Il May 2025 May 2026 20,166 473.74 Y 2025 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN C / FPEPA ACC Rock Island, Il May 2025 May 2026 20,166 473.74 Y 2026 TO BE SELECTED / TO BE SELECTED Option / FPEPA ACC Rock Island, Il Sep 2026 Sep 2027 2,391 687.67 Y 2027 TO BE SELECTED / TO BE SELECTED Option / FPEPA ACC Rock Island, Il May 2027 May 2028 1,344 582.81 Y LI 8030E80010 - CTG, 50MM, All Types Army UNCLASSIFIED Page 5 of 16 P-1 Line #10 (Each) RFP Issue Date Volume 1 - 282 === page 315 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8030E80010 / CTG, 50MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: E80012 / CARTRIDGE, 50 MILLIMETER HEAB-T MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - - 42.517 - 42.517 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - - 42.517 - 42.517 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - - 42.517 - 42.517 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) - - - - - - - - - Subtotal: Recurring Cost - - - - - - - - - - - - - - - - - - Acceptance Test - - - - - - - - Subtotal: Support Acceptance Testing Cost - - - - - - - ROUND Subtotal: Hardware Cost 4,145.55 8,361 34.661 - - - - - 34.661 - - - - - 34.661 - - - - - - 0.900 - - - - - - 0.900 - 4,145.55 8,361 34.661 - - 34.661 - - 34.661 - - - 0.900 - - - - 0.900 Support - Acceptance Testing Cost Support - Production Engineering Cost Production Engineering - - - - - - - - - - - 6.956 - - - - - 6.956 Subtotal: Support Production Engineering Cost - - - - - - - - - - - 6.956 - - - - - 6.956 Gross/Weapon System Cost - - - - - - - - - - - 42.517 - - - - - 42.517 Remarks: FY 2027 is a New Start. (†) indicates the presence of a P-5a LI 8030E80010 - CTG, 50MM, All Types Army UNCLASSIFIED Page 6 of 16 P-1 Line #10 Volume 1 - 283 === page 316 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements COMPLETE ROUND (†) (†) O O C FY Contractor and Location 2027 TO BE SELECTED / TO BE SELECTED P-1 Line Item Number / Title: 8030E80010 / CTG, 50MM, All Types Method/Type or Funding Vehicle C / TBD Location of PCO ROCK ISLAND ARSENAL, IL Item Number / Title [DODIC]: E80012 / CARTRIDGE, 50 MILLIMETER HEAB-T Award Date Date of First Delivery Jul 2027 Jul 2029 Qty (Each) 8,361 Specs Date Unit Cost Avail Revision Now? Available ($) 4,145.55 RFP Issue Date N indicates the presence of a P-21 LI 8030E80010 - CTG, 50MM, All Types Army UNCLASSIFIED Page 7 of 16 P-1 Line #10 Volume 1 - 284 === page 317 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8030E80010 / CTG, 50MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE Item Number / Title [DODIC]: E80012 / CARTRIDGE, 50 MILLIMETER HEAB-T Fiscal Year 2027 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT 8,361 0 B A L A N C E Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND 1 2027 ARMY 8,361 A - LI 8030E80010 - CTG, 50MM, All Types Army J U L A U G UNCLASSIFIED Page 8 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G - 8,361 S E P Volume 1 - 285 === page 318 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8030E80010 / CTG, 50MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Each) O O C M F R # FY SERVICE Item Number / Title [DODIC]: E80012 / CARTRIDGE, 50 MILLIMETER HEAB-T Fiscal Year 2029 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT 8,361 0 Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P J U L A U G S E P B A L A N C E COMPLETE ROUND 1 2027 ARMY 8,361 O C T LI 8030E80010 - CTG, 50MM, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N 705 696 696 696 696 696 696 696 696 696 696 696 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N UNCLASSIFIED Page 9 of 16 P-1 Line #10 0 Volume 1 - 286 === page 319 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8030E80010 / CTG, 50MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Item Number / Title [DODIC]: E80012 / CARTRIDGE, 50 MILLIMETER HEAB-T Production Rates (Each / Month) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 TO BE SELECTED - TO BE SELECTED MSR For 2027 1-8-5 For 2027 MAX For 2027 ALT Prior to Oct 1 100 2,000 5,000 12 ALT After Oct 1 Reorder Manufacturing PLT 10 24 Total After Oct 1 ALT Prior to Oct 1 34 12 ALT After Oct 1 Manufacturing PLT 10 Total After Oct 1 24 34 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 8030E80010 - CTG, 50MM, All Types Army UNCLASSIFIED Page 10 of 16 P-1 Line #10 Volume 1 - 287 === page 320 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8030E80010 / CTG, 50MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: E80013 / CARTRIDGE, 50 MILLIMETER APFSDS-T MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - 36.802 11.109 - 11.109 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - 36.802 11.109 - 11.109 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - 36.802 11.109 - 11.109 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) - - - - - - 969.11 30,879 29.925 Subtotal: Recurring Cost - - - - - - - - 29.925 - - - - - - - - 29.925 Acceptance Test - - - - - - - - First Article Test - - - - - - - - Subtotal: Support Acceptance Testing Cost - - - - - - - - ROUND Subtotal: Hardware Cost 1,264.73 4,708 5.954 - - - - - 5.954 - - - - - 5.954 - - - - - - 0.600 - - 1.291 - - - - - 1.291 - - 0.600 - 1,264.73 4,708 5.954 - - 5.954 - - 5.954 - - - 0.600 - - - - - - - - 0.600 Support - Acceptance Testing Cost Support - Production Engineering Cost Production Engineering - - - - - - - - 5.586 - - 4.555 - - - - - 4.555 Subtotal: Support Production Engineering Cost - - - - - - - - 5.586 - - 4.555 - - - - - 4.555 Gross/Weapon System Cost - - - - - - - - 36.802 - - 11.109 - - - - - 11.109 Remarks: The price difference between FY 2026 and FY 2027 is due to lower demand resulting in a lower quantity for a higher price range on the step ladder pricing matrix. (†) indicates the presence of a P-5a LI 8030E80010 - CTG, 50MM, All Types Army UNCLASSIFIED Page 11 of 16 P-1 Line #10 Volume 1 - 288 === page 321 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 8030E80010 / CTG, 50MM, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E80013 / CARTRIDGE, 50 MILLIMETER APFSDS-T Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 TO BE SELECTED / TO BE SELECTED C / FPEPA PICATINNY ARSENAL, NJ Mar 2026 Mar 2027 30,879 969.11 N 2027 TO BE SELECTED / TO BE SELECTED Option / FPEPA PICATINNY ARSENAL, NJ May 2027 May 2029 4,708 1,264.73 N (Each) RFP Issue Date indicates the presence of a P-21 LI 8030E80010 - CTG, 50MM, All Types Army UNCLASSIFIED Page 12 of 16 P-1 Line #10 Volume 1 - 289 === page 322 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8030E80010 / CTG, 50MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE Item Number / Title [DODIC]: E80013 / CARTRIDGE, 50 MILLIMETER APFSDS-T Fiscal Year 2026 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 2.576 2.573 2.573 2.573 2.573 2.573 A - - - - COMPLETE ROUND 1 2026 ARMY 30.879 .000 30.879 1 2027 ARMY 4.708 .000 A - - - - - - - - - - - - 4.708 O C T LI 8030E80010 - CTG, 50MM, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G 2.573 12.865 - 4.708 S E P Volume 1 - 290 === page 323 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8030E80010 / CTG, 50MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE Item Number / Title [DODIC]: E80013 / CARTRIDGE, 50 MILLIMETER APFSDS-T Fiscal Year 2028 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT O C T Calendar Year 2028 18.014 12.865 2.573 2.573 2.573 2.573 2.573 - - - - - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E .392 .392 .392 .392 .392 2.748 M A Y J U N J U L A U G S E P Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R COMPLETE ROUND 1 2026 ARMY 30.879 1 2027 ARMY 4.708 .000 4.708 O C T LI 8030E80010 - CTG, 50MM, All Types Army N O V D E C J A N F E B .000 M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #10 M A R A P R Volume 1 - 291 === page 324 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8030E80010 / CTG, 50MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E80013 / CARTRIDGE, 50 MILLIMETER APFSDS-T Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R .392 .392 .392 .392 .392 .392 .396 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND 1 2026 ARMY 30.879 30.879 .000 1 2027 ARMY 4.708 1.960 2.748 .000 LI 8030E80010 - CTG, 50MM, All Types Army .000 M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 292 === page 325 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8030E80010 / CTG, 50MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 30 Item Number / Title [DODIC]: E80013 / CARTRIDGE, 50 MILLIMETER APFSDS-T Production Rates (Each / Month) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 TO BE SELECTED - TO BE SELECTED MSR For 2027 1-8-5 For 2027 MAX For 2027 ALT Prior to Oct 1 1 5,000 10,000 12 ALT After Oct 1 Reorder Manufacturing PLT 8 24 Total After Oct 1 ALT Prior to Oct 1 32 ALT After Oct 1 6 Manufacturing PLT 8 Total After Oct 1 24 32 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 8030E80010 - CTG, 50MM, All Types Army UNCLASSIFIED Page 16 of 16 P-1 Line #10 Volume 1 - 293 === page 326 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 33: Mortar Ammunition P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 944.540 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 53.648 38.114 67.727 - 67.727 47.567 50.754 49.490 49.127 - 944.540 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2026 - Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2025 - - - - - - - - - - 53.648 38.114 67.727 - 67.727 47.567 50.754 49.490 49.127 - 944.540 To FY 2031 Complete - - - - - - - - - - 53.648 38.114 67.727 - 67.727 47.567 50.754 49.490 49.127 - Total 1,300.967 1,300.967 1,300.967 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: (E89600) 60MM Mortar, All Types This line includes 60mm Mortar Ammunition, All Types. The 60mm Mortar cartridges are designed for use with the M224A1 Lightweight Company Mortar System (LWCMS) used by the Stryker Brigade Combat Teams as well as light infantry battalions including Airborne, Air Assault and Ranger. The short minimum range of the M224 makes the 60mm mortar ammunition well suited for close protective fires against an assaulting enemy, for block-to-block fighting in cities, and combat over close terrain with restricted visibility. (E70400) CTG, 60mm Mortar VL ILLUM, M721 w/MTSQ Fuze The 60mm Visible (VL) Illumination M721 Cartridge is a fin stabilized, mortar cartridge that consists of an M776 Mechanical Time Super Quick (MTSQ) Fuze, a thin wall steel Body Tube and aluminum Tail Cone that contains the payload (parachute and canister), and a Fin Assembly that contains the Ignition Cartridge and Propelling Charges. The payload is base ejected and upon ignition produces visible light illumination. This VL illumination allows for monitoring of enemy activities and adjustment of fire at greater observation distances during night operations. It also provides a means for day/night signaling. It is particularly useful in combined operations with allies who may not have Night Vision Devices (NVDs). The M721 Illumination Cartridges (range: 200 meters minimum to 3,200 meters maximum) is ballistically similar to the M720A1 HE Cartridge, allowing a gun to illuminate and fire on the same target without adjustments. This item is Code A, approved for service use. (E72199) CTG, 60mm Mortar HE ENFRAG, M1061 Series w/MOFM The M1061, 60mm High Explosive Enhanced Fragmentation (EF) cartridge with Multi-Option Fuze (range: 70 meters minimum to 3,400 meters maximum) is used against personnel and a higher category of materiel target sets providing both fragmentation and blast effect. This round uses the insensitive main charge explosive PBNX-110. Lethality is maintained by an enhanced fragmentation warhead. The M1061 EF uses the highly reliable and countermeasure resistant M734A1 Multi-Option Fuze. When the Fuze is set in the proximity mode, it functions at a height over the target that is optimized for lethality. This item is Code A, approved for service use. (E92200) CTG, 60mm Mortar FRTR, M769 Series w/Practice Fuze LI 0050E89600 - 60MM Mortar, All Types Army UNCLASSIFIED Page 1 of 30 P-1 Line #11 Volume 1 - 294 === page 327 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 33: Mortar Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A The M769 is a low-cost, full-range training round (FRTR) that will replace a percentage of the standard HE rounds used in 60mm mortar training. The M769 (range: 70 meters minimum to 3,500 meters maximum) has been designed to provide the user with realistic training at a fraction of the cost. It is identical in shape, size and weight to the M720/M720A1 High Explosive cartridges. The flash, bang, and smoke signature provided by the M775 Fuze is channeled to exhaust holes in the rear of the cartridge through the use of a center vent tube. This item is Code A, approved for service use. (E92900) CTG, 60mm Mortar HE, M768 Series w/PD Fuze The 60mm HE cartridges are Insensitive Munitions (IM) enhanced; HE rounds. The M768 HE cartridge (range: 70 meters minimum to 3,400 meters maximum) is used with the new M783 dual safety, point detonating/delay Fuze, Tail Fin Assembly, and high fragmentation steel (HF-1) Shell Body loaded with approximately 2 pounds of an IM explosive. This cartridge is used primarily in training because it is significantly less expensive than the M720A1, the preferred war fighting cartridge. However, the M768 is lethal and can be used in combat. This item is Code A, approved for service use. (E93900) CTG, 60mm Mortar HE M720 Series w/MOFM The 60mm HE cartridges are IM enhanced; HE rounds. The M720 HE cartridge (range: 70 meters minimum to 3,400 meters maximum) with Multi-Option Fuze is used against personnel and materiel providing both fragmentation and blast effects. Lethality is maintained by using a high fragmentation steel (HF-1) Shell Body loaded with approximately two pounds of an IM explosive. The M720A1 incorporates the highly reliable and countermeasure resistant M734A1 Multi-Option Fuze. When the Fuze is set in the proximity mode, it functions at a height over the target that is optimized for lethality. This item is Code A, approved for service use. (E85700) CTG, 60mm Mortar IR ILLUM, M767 Series w/MTSQ Fuze The 60mm M767 Infrared (IR) Illumination cartridge is a fin stabilized, mortar cartridge that consists of an M776 Mechanical Time Super Quick (MTSQ) Fuze, a thin wall steel Body Tube and aluminum Tail Cone that contains the payload (parachute and canister), and a Fin Assembly that contains the Ignition Cartridge and Propelling Charges. The payload is base ejected and upon ignition produces infrared (IR) illumination. The advantage of IR over conventional illumination is that there is minimal visible light produced, which reduces the possibility of exposing forward friendly troop positions while also allowing covert adjustment of fire at greater observation distances through use of passive Night Vision Devices (NVD). The M767 Illumination Cartridges (range: 300 meters minimum to 3,175 meters maximum) is ballistically similar to the M720A1 High Explosive (HE) Cartridge, allowing a gun to illuminate and fire on the same target without adjustments. This item is Code A, approved for service use. LI 0050E89600 - 60MM Mortar, All Types Army UNCLASSIFIED Page 2 of 30 P-1 Line #11 Volume 1 - 295 === page 328 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 33: Mortar Ammunition P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD P-5 E70400 / CTG, 60mm Mortar VL ILLUM, M721 w/MTSQ Fuze [B647] P-5a A P-5 E72199 / CTG, 60mm Mortar HE ENFRAG, M1061 Series w/MOFM [BA42] P-5a, P-21 A P-5 E85700 / CTG, 60mm Mortar IR ILLUM, M767 Series w/MTSQ Fuze [BA04] P-5a A P-5 E92200 / CTG, 60mm Mortar FRTR, M769 Series w/Practice Fuze [BA15] P-5a, P-21 A P-5 E92900 / CTG, 60mm Mortar HE, M768 Series w/PD Fuze [BA45] P-5a A P-5 E93900 / CTG, 60mm Mortar HE, M720 Series w/MOFM P-5a A P-40 Total Gross/Weapon System Cost MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 88.122 - / - - / 1.813 - / 89.720 - / - - / 8.490 - / 66.101 - / - - / 247.369 - / 328.746 - / 124.482 - / 944.540 - / 36.655 - / - - / - - - / 8.716 - / - - / 8.716 / - - / 4.047 - / - - / 4.047 / 37.768 / 27.811 - / 37.768 - / - - / - - / - - / 17.196 - / - - - / 16.993 - / - / - - / - - / 53.648 / 67.727 - / - - - - - / 38.114 - / 17.196 - - / - / / 67.727 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Base Budget supports critical Army Title 10 war reserve/operational, training, and test requirements IAW DoD Instruction 3000.04 (Munitions Requirements Process) and AR 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War (OSW) approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. FY 2027 Total Base dollars in the amount of $67.727 million supports the procurement of 107,999 cartridges. E70400 -CTG, 60mm Mortar VL ILLUM, M721 w/MTSQ Fuze This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army procurement goals. There is no FY 2027 budget request for this funding line. TYPE CLASSIFICATION DATE: DECEMBER 1999 E72199 - CTG, 60mm Mortar HE ENFRAG, M1061 Series w/MOFM This is a war reserve item used in combat. FY 2027 request builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $8.716 million supports the procurement of 1,108 cartridges. TYPE CLASSIFICATION DATE: 2013 E85700 CTG, 60mm Mortar IR ILLUM, M767 Series w/MTSQ Fuze This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $4.047 million supports the procurement of 2,234 cartridges. E85700 is a new start in 2027. LI 0050E89600 - 60MM Mortar, All Types Army UNCLASSIFIED Page 3 of 30 P-1 Line #11 Volume 1 - 296 === page 329 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 33: Mortar Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A TYPE CLASSIFICATION DATE: DECEMBER 1999 E92200 - CTG, 60mm Mortar FRTR, M769 Series w/Practice Fuze This is a training unique item not used in combat. FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $37.768 million supports the procurement of 86,156 cartridges. TYPE CLASSIFICATION DATE: 2001 E92900 - CTG, 60mm Mortar HE, M768 Series w/PD Fuze This is a training standard item used in training and combat. The request supports annual training and builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $17.196 million supports the procurement of 18,501 cartridges. E92900 is a new start in 2027 TYPE CLASSIFICATION DATE: 2001 E93900 - CTG, 60mm Mortar HE, M720 Series w/MOFM Fuze This is a training standard item used in training and combat. The request supports annual training and builds a war reserve inventory in accordance with Army's procurement goals. There is no FY 2027 budget request for this funding line. TYPE CLASSIFICATION DATE: 2001 LI 0050E89600 - 60MM Mortar, All Types Army UNCLASSIFIED Page 4 of 30 P-1 Line #11 Volume 1 - 297 === page 330 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E70400 / CTG, 60mm Mortar VL ILLUM, M721 w/MTSQ Fuze [B647] MDAP/MAIS Code: Resource Summary Prior Years FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - - Gross/Weapon System Cost ($ in Millions) 88.122 - 1.813 - - - Less PY Advance Procurement ($ in Millions) - - - - - - 88.122 - 1.813 - - - - - - - - - 88.122 - 1.813 - - - Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, (†) PACK (LAP) FIN ASSEMBLY M27 (†) M702 IGNITION CARTRIDGE (†) PROPELLANT (†) CHARGE, M235 FUZE MTSQ, M776 (†) BODY TUBE, 60MM ILLUM (†) VL ILLUM (†) CANNISTER, 60MM PARACHUTE, (†) 60MM FIBER CONTAINER (†) PA 175, 60MM TAIL CONE, 60MM ILLUM (†) 121.83 10,153 1.237 - - - 261.82 1,023 0.268 - - - - - - - - - 7.95 10,458 0.083 - - - 18.24 1,054 0.019 - - - - - - - - - 17.40 10,458 0.182 - - - 50.23 1,054 0.053 - - - - - - - - - 14.46 41,830 0.605 - - - 28.12 4,214 0.118 - - - - - - - - - 201.50 10,458 2.107 - - - 300.90 1,054 0.317 - - - - - - - - - 16.74 10,458 0.175 - - - 58.50 1,054 0.062 - - - - - - - - - 122.91 10,458 1.285 - - - 561.90 1,054 0.592 - - - - - - - - - 23.00 10,458 0.241 - - - 40.87 1,054 0.043 - - - - - - - - - 3.47 10,458 0.036 - - - 10.21 1,054 0.011 - - - - - - - - - 16.19 10,458 0.169 - - - 56.67 1,054 0.060 - - - - - - - - - LI 0050E89600 - 60MM Mortar, All Types Army UNCLASSIFIED Page 5 of 30 P-1 Line #11 Volume 1 - 298 === page 331 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E70400 / CTG, 60mm Mortar VL ILLUM, M721 w/MTSQ Fuze [B647] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost METAL CONTAINER ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 51.30 1,320 0.068 - - - 94.20 128 0.012 - - - - - - - - - - - 6.189 - - - - - 1.555 - - - - - - - - - - - 6.189 - - - - - 1.555 - - - - - - - - - First Article Test - - 0.068 - - - - - - - - - - - - - - - Acceptance Test - - 0.115 - - - - - 0.040 - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 0.183 - - - - - 0.040 - - - - - - - - - PA191, 60MM (†) Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Production Engineering Cost Production Engineering - - 81.751 - - - - - 0.218 - - - - - - - - - Subtotal: Support Production Engineering Cost - - 81.751 - - - - - 0.218 - - - - - - - - - Gross/Weapon System Cost - - 88.122 - - - - - 1.813 - - - - - - - - - (†) indicates the presence of a P-5a LI 0050E89600 - 60MM Mortar, All Types Army UNCLASSIFIED Page 6 of 30 P-1 Line #11 Volume 1 - 299 === page 332 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements LOAD, ASSEMBLE, PACK (LAP) FIN ASSEMBLY M27 M702 IGNITION CARTRIDGE PROPELLANT CHARGE, M235 FUZE MTSQ, M776 BODY TUBE, 60MM ILLUM VL ILLUM CANNISTER, 60MM PARACHUTE, 60MM FIBER CONTAINER PA 175, 60MM TAIL CONE, 60MM ILLUM METAL CONTAINER PA191, 60MM O O C P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 PINE BLUFF ARSENAL / PINE BLUFF, AR PO PICATINNY ARSENAL, NJ Jan 2026 Jan 2028 1,023 261.82 Y 2026 TO BE SELECTED / TBS01 C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 1,054 18.24 Y 2026 TO BE SELECTED / TBS01 C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 1,054 50.23 Y 2026 TO BE SELECTED / TBS01 C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 4,214 28.12 Y 2026 TO BE SELECTED / TBS01 C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 1,054 300.90 Y 2026 TO BE SELECTED / TBS01 C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 1,054 58.50 Y 2026 CRANE ARMY AMMO ACTIVITY / CRANE, IN PO PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 1,054 561.90 Y 2026 YOLAND CORPORATION / BROOKLYN, NY Option / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 1,054 40.87 Y 2026 TO BE SELECTED / TBS01 C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 1,054 10.21 Y 2026 TO BE SELECTED / TBS01 C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 1,054 56.67 Y 2026 TO BE SELECTED / TBS01 C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 128 94.20 Y LI 0050E89600 - 60MM Mortar, All Types Army Location of PCO Item Number / Title [DODIC]: E70400 / CTG, 60mm Mortar VL ILLUM, M721 w/MTSQ Fuze [B647] UNCLASSIFIED Page 7 of 30 P-1 Line #11 (Each) RFP Issue Date Volume 1 - 300 === page 333 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E72199 / CTG, 60mm Mortar HE ENFRAG, M1061 Series w/MOFM [BA42] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 89.720 - 8.490 8.716 - 8.716 - - - - - - 89.720 - 8.490 8.716 - 8.716 - - - - - - 89.720 - 8.490 8.716 - 8.716 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, 613.21 58,364 35.789 - - - 2,335.21 2,498 5.833 5,385.20 1,108 5.967 - - - 5,385.20 1,108 5.967 284.21 60,115 17.085 - - - 124.81 2,572 0.321 341.75 1,141 0.390 - - - 341.75 1,141 0.390 15.10 60,115 0.908 - - - 50.23 2,572 0.129 26.15 1,141 0.030 - - - 26.15 1,141 0.030 12.36 240,459 2.972 - - - 20.33 10,291 0.209 29.45 4,564 0.134 - - - 29.45 4,564 0.134 7.37 60,115 0.443 - - - 18.24 2,572 0.047 18.62 1,141 0.021 - - - 18.62 1,141 0.021 - - 57.197 - - - - - 6.540 - - 6.542 - - - - - 6.542 - - 57.197 - - - - - 6.540 - - 6.542 - - - - - 6.542 Acceptance Test - - 1.107 - - - - - 0.120 - - 0.120 - - - - - 0.120 First Article Test - - 0.189 - - - - - 1.000 - - 1.040 - - - - - 1.040 Subtotal: Support Acceptance Testing Cost - - 1.296 - - - - - 1.120 - - 1.160 - - - - - 1.160 - - 31.226 - - - - - 0.830 - - 1.013 - - - - - 1.013 (†) PACK (LAP) FUZE MOFM, M734A1 (†) M702 IGNITION CARTRIDGE (†) PROPELLANT (†) CHARGE, M236 FIN ASSEMBLY M27 (†) Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Production Engineering Cost Production Engineering LI 0050E89600 - 60MM Mortar, All Types Army UNCLASSIFIED Page 8 of 30 P-1 Line #11 Volume 1 - 301 === page 334 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E72199 / CTG, 60mm Mortar HE ENFRAG, M1061 Series w/MOFM [BA42] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Subtotal: Support Production Engineering Cost - - 31.226 - - - - - 0.830 - - 1.013 - - - - - 1.013 Gross/Weapon System Cost - - 89.720 - - - - - 8.490 - - 8.716 - - - - - 8.716 Remarks: Multiple new base contracts: pricing incorporates added risk due to economic environment resulting in increased labor and material costs. (†) indicates the presence of a P-5a LI 0050E89600 - 60MM Mortar, All Types Army UNCLASSIFIED Page 9 of 30 P-1 Line #11 Volume 1 - 302 === page 335 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 O O C Cost Elements LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) FUZE MOFM, M734A1 FUZE MOFM, M734A1 M702 IGNITION CARTRIDGE M702 IGNITION CARTRIDGE PROPELLANT CHARGE, M236 PROPELLANT CHARGE, M236 FIN ASSEMBLY M27 FIN ASSEMBLY M27 (†) P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E72199 / CTG, 60mm Mortar HE ENFRAG, M1061 Series w/MOFM [BA42] Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL May 2026 May 2028 2,498 2,335.21 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Jun 2027 Jun 2029 1,108 5,385.20 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 2,572 124.81 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Jun 2027 Dec 2028 1,141 341.75 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 2,572 50.23 Y 2027 NAMMO POCAL INC. / SCRANTON, PA SS / IDIQ PICATINNY ARSENAL, NJ Jun 2027 Dec 2028 1,141 26.15 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 10,291 20.33 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Jun 2027 Dec 2028 4,564 29.45 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 2,572 18.24 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Jun 2027 Dec 2028 1,141 18.62 Y (Each) RFP Issue Date indicates the presence of a P-21 LI 0050E89600 - 60MM Mortar, All Types Army UNCLASSIFIED Page 10 of 30 P-1 Line #11 Volume 1 - 303 === page 336 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E72199 / CTG, 60mm Mortar HE ENFRAG, M1061 Series w/MOFM [BA42] Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 58364 1 2026 ARMY 2,498 0 2,498 1 2027 ARMY 1,108 0 1,108 A O C T LI 0050E89600 - 60MM Mortar, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #11 M A R A P R M A Y - - - - 2,498 A - - - - 1,108 J U N J U L A U G S E P Volume 1 - 304 === page 337 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E72199 / CTG, 60mm Mortar HE ENFRAG, M1061 Series w/MOFM [BA42] Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 58364 1 2026 ARMY 2,498 0 2,498 - - - - - - - 2,498 1 2027 ARMY 1,108 0 1,108 - - - - - - - - O C T LI 0050E89600 - 60MM Mortar, All Types Army N O V D E C J A N F E B M A R A P R M A Y 0 J U N J U L A U G UNCLASSIFIED Page 12 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #11 M A R A P R M A Y 1,108 J U N 0 J U L A U G S E P Volume 1 - 305 === page 338 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E72199 / CTG, 60mm Mortar HE ENFRAG, M1061 Series w/MOFM [BA42] Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 TO BE SELECTED - TO BE SELECTED MSR For 2027 1-8-5 For 2027 MAX For 2027 2,000 12,000 50,000 ALT Prior to Oct 1 ALT After Oct 1 9 Reorder Manufacturing PLT 9 24 Total After Oct 1 ALT Prior to Oct 1 33 ALT After Oct 1 9 Manufacturing PLT 9 Total After Oct 1 24 33 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0050E89600 - 60MM Mortar, All Types Army UNCLASSIFIED Page 13 of 30 P-1 Line #11 Volume 1 - 306 === page 339 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E85700 / CTG, 60mm Mortar IR ILLUM, M767 Series w/MTSQ Fuze [BA04] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 66.101 - - 4.047 - 4.047 - - - - - - 66.101 - - 4.047 - 4.047 - - - - - - 66.101 - - 4.047 - 4.047 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, (†) PACK (LAP) FIN ASSEMBLY M27 (†) M702 IGNITION CARTRIDGE (†) PROPELLANT (†) CHARGE, M235 FUZE MTSQ, M776 (†) BODY TUBE, 60MM ILLUM (†) TAIL CONE, 60MM ILLUM (†) PARACHUTE, (†) 60MM IR ILLUM (†) CANNISTER, 60MM FIBER CONTAINER (†) PA 175, 60MM 148.03 29,017 4.295 - - - - - - 351.54 2,234 0.785 - - - 351.54 2,234 0.785 7.60 29,887 0.227 - - - - - - 18.62 2,301 0.043 - - - 18.62 2,301 0.043 14.98 29,887 0.448 - - - - - - 26.15 2,301 0.060 - - - 26.15 2,301 0.060 13.24 119,550 1.582 - - - - - - 29.45 9,204 0.271 - - - 29.45 9,204 0.271 218.78 29,887 6.539 - - - - - - 307.22 2,301 0.707 - - - 307.22 2,301 0.707 25.02 29,887 0.748 - - - - - - 59.71 2,301 0.137 - - - 59.71 2,301 0.137 21.16 29,887 0.632 - - - - - - 57.85 2,301 0.133 - - - 57.85 2,301 0.133 24.29 29,887 0.726 - - - - - - 41.72 2,301 0.096 - - - 41.72 2,301 0.096 89.29 29,887 2.669 - - - - - - 525.00 2,301 1.208 - - - 525.00 2,301 1.208 3.53 29,887 0.105 - - - - - - 10.43 2,301 0.024 - - - 10.43 2,301 0.024 LI 0050E89600 - 60MM Mortar, All Types Army UNCLASSIFIED Page 14 of 30 P-1 Line #11 Volume 1 - 307 === page 340 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E85700 / CTG, 60mm Mortar IR ILLUM, M767 Series w/MTSQ Fuze [BA04] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost METAL CONTAINER ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 47.29 3,671 0.174 - - - - - - 96.15 279 0.027 - - - 96.15 279 0.027 - - 18.145 - - - - - - - - 3.492 - - - - - 3.492 - - 18.145 - - - - - - - - 3.492 - - - - - 3.492 Acceptance Test - - 0.731 - - - - - - - - 0.090 - - - - - 0.090 Subtotal: Support Acceptance Testing Cost - - 0.731 - - - - - - - - 0.090 - - - - - 0.090 PA191, 60MM (†) Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Production Engineering Cost Production Engineering - - 47.225 - - - - - - - - 0.465 - - - - - 0.465 Subtotal: Support Production Engineering Cost - - 47.225 - - - - - - - - 0.465 - - - - - 0.465 Gross/Weapon System Cost - - 66.101 - - - - - - - - 4.047 - - - - - 4.047 Remarks: Multiple new base contracts: pricing incorporates added risk due to economic environment resulting in increased labor and material costs. (†) indicates the presence of a P-5a LI 0050E89600 - 60MM Mortar, All Types Army UNCLASSIFIED Page 15 of 30 P-1 Line #11 Volume 1 - 308 === page 341 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements O O C P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2027 PINE BLUFF ARSENAL / PINE BLUFF, AR PO PICATINNY ARSENAL, NJ Jun 2027 Jun 2030 2,234 351.54 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Jun 2027 Dec 2028 2,301 18.62 Y 2027 NAMMO POCAL INC. / SCRANTON, PA SS / IDIQ PICATINNY ARSENAL, NJ Jun 2027 Dec 2028 2,301 26.15 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Jun 2027 Dec 2028 9,204 29.45 Y 2027 JUNGHANS MICROTEC GMBH / DUNNINGEN, GERMANY SS / IDIQ ROCK ISLAND ARSENAL, IL Jun 2027 Feb 2029 2,301 307.22 Y 2027 LEWIS ENGINEERING COMPANY / MARSHALL, TX SS / IDIQ PICATINNY ARSENAL, NJ Jun 2027 Dec 2028 2,301 59.71 Y 2027 LEWIS ENGINEERING COMPANY / MARSHALL, TX SS / IDIQ PICATINNY ARSENAL, NJ Jun 2027 Dec 2028 2,301 57.85 Y 2027 YOLAND CORPORATION / BROOKLYN, NY SS / IDIQ ROCK ISLAND ARSENAL, IL Jun 2027 Dec 2028 2,301 41.72 Y 2027 CRANE ARMY AMMO ACTIVITY / CRANE, IN PO PICATINNY ARSENAL, NJ Jun 2027 Dec 2028 2,301 525.00 Y FIBER CONTAINER PA 175, 60MM 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Jun 2027 Dec 2028 2,301 10.43 Y METAL CONTAINER PA191, 60MM 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Jun 2027 Nov 2028 279 96.15 Y LOAD, ASSEMBLE, PACK (LAP) FIN ASSEMBLY M27 M702 IGNITION CARTRIDGE PROPELLANT CHARGE, M235 FUZE MTSQ, M776 BODY TUBE, 60MM ILLUM TAIL CONE, 60MM ILLUM PARACHUTE, 60MM IR ILLUM CANNISTER, 60MM LI 0050E89600 - 60MM Mortar, All Types Army Location of PCO Item Number / Title [DODIC]: E85700 / CTG, 60mm Mortar IR ILLUM, M767 Series w/MTSQ Fuze [BA04] UNCLASSIFIED Page 16 of 30 P-1 Line #11 (Each) RFP Issue Date Volume 1 - 309 === page 342 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E92200 / CTG, 60mm Mortar FRTR, M769 Series w/Practice Fuze [BA15] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 36.655 27.811 37.768 - 37.768 - Gross/Weapon System Cost ($ in Millions) 247.369 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 247.369 Plus CY Advance Procurement ($ in Millions) - - - - - 36.655 27.811 37.768 - 37.768 - Total Obligation Authority ($ in Millions) 247.369 FY 2027 Total - - - - - 36.655 27.811 37.768 - 37.768 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Load, Assemble, Pack 21.15 494,287 10.454 30.00 137,449 4.123 93.72 61,128 5.729 77.25 86,156 6.656 - - - 77.25 86,156 6.656 21.73 509,116 11.062 30.25 141,573 4.283 30.77 62,961 1.937 33.68 88,740 2.989 - - - 33.68 88,740 2.989 39.80 509,116 20.264 67.16 141,573 9.508 74.71 62,961 4.704 96.80 88,740 8.590 - - - 96.80 88,740 8.590 15.85 509,116 8.070 23.95 141,573 3.391 50.23 62,961 3.163 26.16 88,740 2.321 - - - 26.16 88,740 2.321 13.58 2,036,462 27.654 19.22 566,290 10.884 28.13 251,847 7.084 29.46 354,962 10.457 - - - 29.46 354,962 10.457 Fin Assembly M27 7.44 509,116 3.785 8.45 141,573 1.196 18.24 62,961 1.148 18.62 88,740 1.652 - - - 18.62 88,740 1.652 Subtotal: Recurring Cost - - 81.288 - - 33.385 - - 23.765 - - 32.665 - - - - - 32.665 - - 81.288 - - 33.385 - - 23.765 - - 32.665 - - - - - 32.665 Acceptance Test - - 3.258 - - 0.402 - - 0.457 - - 0.605 - - - - - 0.605 First Article Test - - - - - 1.059 - - 1.256 - - 0.970 - - - - - 0.970 Subtotal: Support Acceptance Testing Cost - - 3.258 - - 1.461 - - 1.713 - - 1.575 - - - - - 1.575 - - 0.220 - - - - - - - - - - - - - - - (LAP) (†) Fuze Practice, M775 (†) Shell Body, 60MM (†) FRPC M702 Ignition Cartridge (†) Propellant Charge, M235 (†) (†) Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Product Improvement Cost Reliability LI 0050E89600 - 60MM Mortar, All Types Army UNCLASSIFIED Page 17 of 30 P-1 Line #11 Volume 1 - 310 === page 343 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E92200 / CTG, 60mm Mortar FRTR, M769 Series w/Practice Fuze [BA15] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) Subtotal: Support - Product Improvement Cost FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 0.220 - - - - - - - - - - - - - - - Production Engineering - - 162.483 - - 1.809 - - 2.333 - - 3.528 - - - - - 3.528 Subtotal: Support Production Engineering Cost - - 162.483 - - 1.809 - - 2.333 - - 3.528 - - - - - 3.528 Support - Production Engineering Cost Support - System Test and Evaluation Cost Operational Test and Evaluation - - 0.119 - - - - - - - - - - - - - - - Subtotal: Support - System Test and Evaluation Cost - - 0.119 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 247.369 - - 36.655 - - 27.811 - - 37.768 - - - - - 37.768 Remarks: Multiple new base contracts: pricing incorporates added risk due to economic environment resulting in increased labor and material costs. (†) indicates the presence of a P-5a LI 0050E89600 - 60MM Mortar, All Types Army UNCLASSIFIED Page 18 of 30 P-1 Line #11 Volume 1 - 311 === page 344 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 O O C Cost Elements (†) Load, Assemble, Pack (LAP) (†) Load, Assemble, Pack (LAP) (†) Load, Assemble, Pack (LAP) Fuze Practice, M775 Fuze Practice, M775 Fuze Practice, M775 Shell Body, 60MM FRPC Shell Body, 60MM FRPC Shell Body, 60MM FRPC M702 Ignition Cartridge M702 Ignition Cartridge M702 Ignition Cartridge Propellant Charge, M235 Propellant Charge, M235 Propellant Charge, M235 Fin Assembly M27 Fin Assembly M27 Fin Assembly M27 (†) P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E92200 / CTG, 60mm Mortar FRTR, M769 Series w/Practice Fuze [BA15] Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 NAMMO POCAL INC. / SCRANTON, PA C / IDIQ PICATINNY ARSENAL, NJ Aug 2025 Aug 2027 137,449 30.00 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ May 2026 May 2028 61,128 93.72 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Jun 2027 Jun 2029 86,156 77.25 Y 2025 NAMMO POCAL INC. / SCRANTON, PA SS / IDIQ PICATINNY ARSENAL, NJ Mar 2025 Sep 2026 141,573 30.25 Y 2026 TO BE SELECTED / TO BE SELECTED Option / FFP PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 62,961 30.77 Y 2027 NAMMO POCAL INC. / SCRANTON, PA SS / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 88,740 33.68 Y 2025 GLOBAL MILITARY PRODUCTS, INC. / TAMPA, FL C / IDIQ PICATINNY ARSENAL, NJ Aug 2025 Feb 2027 141,573 67.16 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 62,961 74.71 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 88,740 96.80 Y 2025 NAMMO POCAL INC. / SCRANTON, PA SS / IDIQ PICATINNY ARSENAL, NJ Apr 2025 Oct 2026 141,573 23.95 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 62,961 50.23 Y 2027 NAMMO POCAL INC. / SCRANTON, PA SS / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 88,740 26.16 Y 2025 GENERAL DYNAMICS ORD & TAC SYS / MARION, IL C / IDIQ ROCK ISLAND ARSENAL, IL Jun 2025 Dec 2026 566,290 19.22 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 251,847 28.13 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 354,962 29.46 Y 2025 GLOBE TECH LLC. / PLYMOUTH, MI C / IDIQ PICATINNY ARSENAL, NJ Apr 2025 Oct 2026 141,573 8.45 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 62,961 18.24 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 88,740 18.62 Y RFP Issue Date indicates the presence of a P-21 LI 0050E89600 - 60MM Mortar, All Types Army UNCLASSIFIED Page 19 of 30 P-1 Line #11 Volume 1 - 312 === page 345 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 LI 0050E89600 - 60MM Mortar, All Types Army P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types UNCLASSIFIED Page 20 of 30 Item Number / Title [DODIC]: E92200 / CTG, 60mm Mortar FRTR, M769 Series w/Practice Fuze [BA15] P-1 Line #11 Volume 1 - 313 === page 346 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements (Units in Thousands) O O C M F R # FY PROC QTY SERVICE Item Number / Title [DODIC]: E92200 / CTG, 60mm Mortar FRTR, M769 Series w/Practice Fuze [BA15] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Load, Assemble, Pack (LAP) Prior Years Deliveries: 494287 2 2025 ARMY 137.449 .000 137.449 A - - - - - - - - - - - - - - 137.449 2 2025 MC (‡) 58.345 .000 58.345 A - - - - - - - - - - - - - - 58.345 2 2025 NSOF 3.888 .000 3.888 A - - - - - - - - - - - - - - 3.888 2 2025 Total 199.682 .000 199.682 - - - - - - - - - - - - - - 199.682 1 2026 ARMY 61.128 .000 61.128 A - - - - - 61.128 1 2026 MC (‡) 36.503 .000 36.503 A - - - - - 36.503 1 2026 Total 97.631 .000 97.631 - - - - - 97.631 1 2027 ARMY 86.156 .000 86.156 1 2027 MC (‡) 6.290 .000 6.290 6.290 1 2027 Total 92.446 .000 92.446 92.446 (‡) 86.156 O C T LI 0050E89600 - 60MM Mortar, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 21 of 30 S E P O C T N O V D E C J A N F E B P-1 Line #11 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 314 === page 347 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements (Units in Thousands) O O C M F R # FY PROC QTY SERVICE Item Number / Title [DODIC]: E92200 / CTG, 60mm Mortar FRTR, M769 Series w/Practice Fuze [BA15] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Load, Assemble, Pack (LAP) Prior Years Deliveries: 494287 2 2025 ARMY 137.449 .000 137.449 - - - - - - - 2 2025 MC (‡) 58.345 .000 58.345 - - - - - - - 12.000 12.000 12.000 12.000 10.345 - - - - 2 2025 NSOF 3.888 .000 3.888 - - - - - - - 3.888 - - - - 2 2025 Total 199.682 .000 199.682 - - - - - - - 15.888 12.000 12.000 36.000 34.345 24.000 24.000 24.000 17.449 1 2026 ARMY 61.128 .000 61.128 - - - - - - - - - - - - - - - 1 2026 MC (‡) 36.503 .000 36.503 - - - - - - - - - - - - - - 1 2026 Total 97.631 .000 97.631 - - - - - - - - - - - - - 1 2027 ARMY 86.156 .000 86.156 A - - - - 1 2027 MC (‡) 6.290 .000 6.290 A - - - 1 2027 Total 92.446 .000 92.446 - - - (‡) O C T LI 0050E89600 - 60MM Mortar, All Types Army N O V D E C J A N F E B M A R A P R - M A Y - - - J U N 24.000 24.000 24.000 24.000 24.000 17.449 - J U L - A U G UNCLASSIFIED Page 22 of 30 - S E P .000 .000 .000 - - - - - - - 12.000 12.000 12.000 13.000 12.128 .000 - - - - - 12.000 12.000 12.503 .000 - - - - - - 24.000 24.000 24.503 13.000 12.128 - - - - - - - - - - - - - - - - - - - - - - - - - 6.290 - - - - - - - - - - - - - 92.446 O C T N O V D E C J A N F E B P-1 Line #11 M A R A P R - M A Y - J U N - J U L - - - A U G - .000 .000 86.156 S E P Volume 1 - 315 === page 348 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements (Units in Thousands) O O C M F R # FY PROC QTY SERVICE Item Number / Title [DODIC]: E92200 / CTG, 60mm Mortar FRTR, M769 Series w/Practice Fuze [BA15] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Load, Assemble, Pack (LAP) Prior Years Deliveries: 494287 2 2025 ARMY 137.449 137.449 .000 .000 2 2025 MC (‡) 58.345 58.345 .000 .000 2 2025 NSOF 3.888 3.888 .000 2 2025 Total 199.682 199.682 .000 1 2026 ARMY 61.128 61.128 .000 1 2026 MC (‡) 36.503 36.503 .000 1 2026 Total 97.631 97.631 .000 - - - - - - - - 1 2027 ARMY 86.156 .000 86.156 - - - - - - - - 17.710 24.000 24.000 20.446 1 2027 MC (‡) 6.290 .000 6.290 - - - - - - - - 6.290 1 2027 Total 92.446 .000 92.446 - - - - - - - - 24.000 24.000 24.000 20.446 (‡) .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 .000 .000 O C T LI 0050E89600 - 60MM Mortar, All Types Army N O V D E C J A N F E B M A R A P R M A Y - J U N - - J U L - A U G UNCLASSIFIED Page 23 of 30 - - - - - - - - - - - - .000 S E P .000 .000 O C T N O V D E C J A N F E B P-1 Line #11 M A R A P R M A Y J U N J U L A U G - .000 S E P Volume 1 - 316 === page 349 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E92200 / CTG, 60mm Mortar FRTR, M769 Series w/Practice Fuze [BA15] Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 TO BE SELECTED - TO BE SELECTED 12,000 24,000 50,000 9 9 24 33 9 9 24 33 2 NAMMO POCAL INC. SCRANTON, PA 12,000 24,000 50,000 8 8 24 32 8 8 24 32 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0050E89600 - 60MM Mortar, All Types Army UNCLASSIFIED Page 24 of 30 P-1 Line #11 Volume 1 - 317 === page 350 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E92900 / CTG, 60mm Mortar HE, M768 Series w/PD Fuze [BA45] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 - Gross/Weapon System Cost ($ in Millions) 328.746 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 328.746 Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) 328.746 FY 2027 Base FY 2027 OOC - FY 2026 - - - FY 2027 Total - - - 17.196 - 17.196 - - - - - - - 17.196 - 17.196 - - - - - - - 17.196 - 17.196 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, 62.14 225,200 13.995 - - - - - - 179.42 18,501 3.319 - - - 179.42 18,501 3.319 40.53 231,958 9.402 - - - - - - 106.71 19,056 2.033 - - - 106.71 19,056 2.033 7.36 231,958 1.708 - - - - - - 18.62 19,056 0.355 - - - 18.62 19,056 0.355 17.82 231,958 4.134 - - - - - - 26.16 19,056 0.499 - - - 26.16 19,056 0.499 12.13 927,824 11.251 - - - - - - 29.46 76,224 2.246 - - - 29.46 76,224 2.246 177.62 231,958 41.201 - - - - - - 232.14 19,056 4.424 - - - 232.14 19,056 4.424 96.46 6,289 0.607 - - - - - - 93.36 1,110 0.104 - - - 93.36 1,110 0.104 (†) 22.33 570,177 12.735 - - - - - - 30.14 34,226 1.032 - - - 30.14 34,226 1.032 Subtotal: Recurring Cost - - 95.031 - - - - - - - - 14.011 - - - - - 14.011 - - 95.031 - - - - - - - - 14.011 - - - - - 14.011 - - 1.749 - - - - - - - - 0.150 - - - - - 0.150 (†) PACK (LAP) SHELL BODY (HF1), 60MM HE (†) FIN ASSEMBLY M27 (†) M702 IGNITION CARTRIDGE (†) PROPELLANT (†) CHARGE, M235 FUZE POINT DETONATOR M783 (†) PBXW-12 BULK EXPLOSIVE (†) EXPLOSIVE FILL IMX-104 Subtotal: Hardware Cost Support - Acceptance Testing Cost Acceptance Test LI 0050E89600 - 60MM Mortar, All Types Army UNCLASSIFIED Page 25 of 30 P-1 Line #11 Volume 1 - 318 === page 351 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E92900 / CTG, 60mm Mortar HE, M768 Series w/PD Fuze [BA45] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) First Article Test - - 0.175 - - - - - - - - 1.040 - - - - - 1.040 Subtotal: Support Acceptance Testing Cost - - 1.924 - - - - - - - - 1.190 - - - - - 1.190 Support - Production Engineering Cost Production Engineering - - 231.789 - - - - - - - - 1.995 - - - - - 1.995 Subtotal: Support Production Engineering Cost - - 231.789 - - - - - - - - 1.995 - - - - - 1.995 Gross/Weapon System Cost - - 328.746 - - - - - - - - 17.196 - - - - - 17.196 Remarks: Multiple new base contracts: pricing incorporates added risk due to economic environment resulting in increased labor and material costs. (†) indicates the presence of a P-5a LI 0050E89600 - 60MM Mortar, All Types Army UNCLASSIFIED Page 26 of 30 P-1 Line #11 Volume 1 - 319 === page 352 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements LOAD, ASSEMBLE, PACK (LAP) SHELL BODY (HF1), 60MM HE FIN ASSEMBLY M27 M702 IGNITION CARTRIDGE PROPELLANT CHARGE, M235 FUZE POINT DETONATOR M783 PBXW-12 BULK EXPLOSIVE EXPLOSIVE FILL IMX-104 O O C P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Jun 2027 Jun 2029 18,501 179.42 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Mar 2029 19,056 106.71 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 19,056 18.62 Y 2027 NAMMO POCAL INC. / SCRANTON, PA SS / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 19,056 26.16 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 76,224 29.46 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 19,056 232.14 Y 2027 BAE SYSTEMS ORDNANCE SYSTEMS INC / KINGSPORT, TN Option / IDIQ ROCK ISLAND ARSENAL, IL Jul 2027 Jul 2028 1,110 93.36 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Jul 2027 Jul 2028 34,226 30.14 Y LI 0050E89600 - 60MM Mortar, All Types Army Location of PCO Item Number / Title [DODIC]: E92900 / CTG, 60mm Mortar HE, M768 Series w/PD Fuze [BA45] UNCLASSIFIED Page 27 of 30 P-1 Line #11 (Each) RFP Issue Date Volume 1 - 320 === page 353 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E93900 / CTG, 60mm Mortar HE, M720 Series w/MOFM MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - 16.993 - - - - - - - - - 16.993 - - - - - - - - - 16.993 - - - - - Gross/Weapon System Cost ($ in Millions) 124.482 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 124.482 Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) 124.482 FY 2026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, 100.71 73,168 7.369 75.22 23,972 1.803 - - - - - - - - - - - - 263.69 77,417 20.414 244.27 24,691 6.031 - - - - - - - - - - - - 63.50 75,363 4.785 84.67 24,691 2.091 - - - - - - - - - - - - 22.24 75,363 1.676 23.95 24,691 0.591 - - - - - - - - - - - - 16.79 301,452 5.061 17.43 98,765 1.721 - - - - - - - - - - - - 8.69 75,363 0.655 8.45 24,691 0.209 - - - - - - - - - - - - 14.19 97,182 1.379 15.07 44,348 0.668 - - - - - - - - - - - - - - 41.339 - - 13.115 - - - - - - - - - - - - - - 41.339 - - 13.115 - - - - - - - - - - - - Acceptance Test - - 1.203 - - 0.250 - - - - - - - - - - - - First Article Test - - 1.480 - - 0.842 - - - - - - - - - - - - (†) PACK (LAP) FUZE MOFM, M734A1 (†) SHELL BODY (HF1), 60MM HE (†) M702 IGNITION CARTRIDGE (†) PROPELLANT (†) CHARGE, M235 FIN ASSEMBLY M27 (†) COMP B TYPE I GRADE A (†) Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Acceptance Testing Cost LI 0050E89600 - 60MM Mortar, All Types Army UNCLASSIFIED Page 28 of 30 P-1 Line #11 Volume 1 - 321 === page 354 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E93900 / CTG, 60mm Mortar HE, M720 Series w/MOFM MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) Subtotal: Support Acceptance Testing Cost FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 2.683 - - 1.092 - - - - - - - - - - - - Support - Production Engineering Cost Production Engineering - - 80.460 - - 2.787 - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - 80.460 - - 2.787 - - - - - - - - - - - - Gross/Weapon System Cost - - 124.482 - - 16.993 - - - - - - - - - - - - (†) indicates the presence of a P-5a LI 0050E89600 - 60MM Mortar, All Types Army UNCLASSIFIED Page 29 of 30 P-1 Line #11 Volume 1 - 322 === page 355 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements LOAD, ASSEMBLE, PACK (LAP) FUZE MOFM, M734A1 SHELL BODY (HF1), 60MM HE M702 IGNITION CARTRIDGE PROPELLANT CHARGE, M235 FIN ASSEMBLY M27 COMP B TYPE I GRADE A O O C P-1 Line Item Number / Title: 0050E89600 / 60MM Mortar, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 DAY & ZIMMERMAN (KSAAP) / PARSONS, KS C / IDIQ PICATINNY ARSENAL, NJ Sep 2025 Sep 2027 23,972 75.22 Y 2025 L-3 FUZING & ORDANCE SYSTEMS INC / CINCINNATI, OH C / IDIQ PICATINNY ARSENAL, NJ Jun 2025 Dec 2026 24,691 244.27 Y 2025 GLOBE TECH LLC. / PLYMOUTH, MI C / IDIQ PICATINNY ARSENAL, NJ Aug 2025 Feb 2027 24,691 84.67 Y 2025 NAMMO POCAL INC. / SCRANTON, PA SS / IDIQ PICATINNY ARSENAL, NJ Apr 2025 Oct 2026 24,691 23.95 Y 2025 AMERICAN ORDNANCE LLC (IAAAP) / MIDDLETOWN, IA C / IDIQ ROCK ISLAND ARSENAL, IL Jun 2025 Dec 2026 98,765 17.43 Y 2025 GLOBE TECH LLC. / PLYMOUTH, MI C / IDIQ PICATINNY ARSENAL, NJ Apr 2025 Oct 2026 24,691 8.45 Y 2025 BAE SYSTEMS ORDNANCE SYSTEMS INC / KINGSPORT, TN Option / IDIQ ROCK ISLAND ARSENAL, IL Aug 2025 Aug 2026 44,348 15.07 Y LI 0050E89600 - 60MM Mortar, All Types Army Location of PCO Item Number / Title [DODIC]: E93900 / CTG, 60mm Mortar HE, M720 Series w/MOFM UNCLASSIFIED Page 30 of 30 P-1 Line #11 (Each) RFP Issue Date Volume 1 - 323 === page 356 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 33: Mortar Ammunition P-1 Line Item Number / Title: 3584E76000 / 81MM Mortar, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 1,005.445 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 1,005.445 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 1,005.445 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 95.288 41.786 67.587 69.951 67.314 51.733 - - - 95.288 41.786 - - 95.288 41.786 123.745 - - 123.745 - - 123.745 - 123.745 123.745 123.745 To FY 2031 Complete - - - - - 67.587 69.951 67.314 51.733 - - - - - - 67.587 69.951 67.314 51.733 - Total 1,522.849 1,522.849 1,522.849 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line includes 81mm Mortar Ammunition, All Types. The 81mm mortar cartridges are designed for use with the M252 Mortar Weapon System, used by Stryker Brigade Combat Teams and light infantry battalions, including Airborne, Air Assault, and Ranger units. (E18403) CTG, MORTAR, 81mm HE M821 W/MOFM The 81mm High Explosive (HE) cartridges are Insensitive Munitions (IM) enhanced. The 81mm HE cartridges consist of a Fuze, a threaded plastic Fuze Adapter, a High Fragmentation HF-1 Steel Body loaded with approximately three pounds of IMX-104 explosive, a plastic Obturating Ring, a M24 Fin, the M220 Propelling Charges, and a M299 Ignition Cartridge. The M821A2 HE (range: 70 meters minimum to 5,859 meters maximum) also incorporates the highly reliable and robust electronic countermeasure resistant M734A1 multi-option Fuze. When the Fuze is set in the proximity mode, it functions at a height over the target that is optimized for lethality. The IM features of this cartridge reduce the vulnerability to unplanned stimuli, e.g., fire/heat, shock and impact. To maintain the required effectiveness while implementing IM features, the M821A4 cartridge incorporates warhead modifications in order to meet all requirements. Specifically, the warhead consists of a fragmentation sleeve with an HF-1 Steel Body. All other components are the same and utilize existing production lines and production contracts. These items are Code A, approved for service use. (E18404) CTG, MORTAR, 81mm HE M889 SERIES W/PD FUZE The 81mm HE cartridges are IM enhanced. The 81mm HE cartridges consist of a Fuze, a threaded plastic Fuze Adapter, a HF-1 steel projectile body loaded with approximately three pounds of IMX-104 Explosive, a plastic Obturating Ring, a M24 Fin, the M220 Propelling Charges, and a M299 Ignition Cartridge. The M889A4 HE (range: 70 meters minimum to 5,859 meters maximum) is used with the new M783 dual safety, point detonating/delay Fuze. This cartridge is used primarily in training because it is significantly less expensive than the M821A2, the preferred war fighting cartridge. However, the M889A4 is lethal and can be used in combat. The IM features of this cartridge reduce the vulnerability to unplanned stimuli, e.g., fire/heat, shock, and impact while maintaining or exceeding the same level of effectiveness in combat. These items are Code A, approved for service use. (E69600) CTG, MORTAR, 81mm FRTR M879 SERIES W/PRACTICE FUZE The M879 is a low-cost, full-range, training round (FRTR) that will replace a percentage of the standard HE rounds used in 81mm mortar training. The M879 (range: 70 meters minimum to 5,800 meters maximum) has been designed to provide the user with realistic training at a fraction of the cost. It is identical in shape, size, and weight to the M889A4/M821A4 HE cartridges. The flash, bang, and smoke signature provided by the M751 practice Fuze is channeled to exhaust holes in the rear of the cartridge using a center vent tube. This item is Code A, approved for service use. LI 3584E76000 - 81MM Mortar, All Types Army UNCLASSIFIED Page 1 of 26 P-1 Line #12 Volume 1 - 324 === page 357 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 33: Mortar Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 3584E76000 / 81MM Mortar, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A (E76100) - CTG, MORTAR, 81mm VL ILLUM M853 SERIES W/MTSQ FUZE The 81mm M853A1 Visible Light (VL) Illumination Cartridge is a Fin stabilized, mortar cartridge that consists of an M772 Mechanical Time Super Quick (MTSQ) Fuze, a thin wall aluminum Body Tube and aluminum Tail Cone that contains the payload (Parachute and Canister), and a Fin Assembly that contains the Ignition Cartridge and Propelling Charges. The payload is base ejected and upon ignition produces VL illumination, which allows for monitoring of enemy activities and adjustment of fire at greater observation distances during night operations. It also provides a means for day/night signaling. It is particularly useful in combined operations with allies who may not have Night Vision Devices (NVDs). This round illuminates to the full range of the 81mm HE round, which allows adjustment of fire at any distance out to the maximum range. The M853A1 (range: 300 meters minimum and 5,050 meters maximum) is range-matched to the 81mm HE and Smoke cartridges. This item is Code A, approved for service use. LI 3584E76000 - 81MM Mortar, All Types Army UNCLASSIFIED Page 2 of 26 P-1 Line #12 Volume 1 - 325 === page 358 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 33: Mortar Ammunition P-1 Line Item Number / Title: 3584E76000 / 81MM Mortar, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 E18403 / CTG, 81mm Mortar HE, M821 Series w/MOFM [CA66] P-5a A - / 472.696 - / 53.931 / - - / - P-5 E18404 / CTG, 81mm Mortar HE, M889 Series w/PD Fuze [CA63] P-5a, P-21 A - / 175.922 - / 6.517 - / 8.133 - / 66.129 - / - - / 66.129 P-5 E69600 / CTG, 81mm FRTR, M879 Series w/Practice Fuze [C875] P-5a, P-21 A - / 250.487 - / 25.871 - / 24.737 - / 39.814 - / - - / 39.814 P-5 E76100 / CTG, 81mm Mortar VL ILLUM, M853 Series w/MTSQ Fuze [C871] P-5a A P-40 Total Gross/Weapon System Cost - - / - - - / - / 106.340 - / 8.969 - / 8.916 - / 17.802 - / - - / 17.802 / 1,005.445 - / 95.288 - / 41.786 - / 123.745 - / - - / 123.745 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Base Budget supports critical Army Title 10 war reserve/operational, training, and test requirements IAW DoD Instruction 3000.04 (Munitions Requirements Process) and AR 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War, OSW-approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. FY 2027 Total Base dollars in the amount of $123.745 million supports procurement of 157,736 cartridges. (E18403) CTG, MORTAR, 81MM HE M821 SERIES W/MOFM This is a training standard item used in training and combat. The request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. There is no FY 2027 budget request for this funding line. TYPE CLASSIFICATION DATE: June 1996. (E18404) - CTG, MORTAR 81MM HE M889 SERIES W/PD FUZE This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $66.129 million supports procurement of 68,296 cartridges. TYPE CLASSIFICATION DATE: July 2009 (E69600) CTG, MORTAR, 81MM FRTR M879 SERIES W/PRACTICE FUZE This is a training unique item not used in combat. FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $39.814 million supports procurement of 80,113 cartridges. TYPE CLASSIFICATION DATE: August 1986 (E76100) CTG, MORTAR, 81MM VL ILLUM M853A1 SERIES W/MTSQ FUZE LI 3584E76000 - 81MM Mortar, All Types Army UNCLASSIFIED Page 3 of 26 P-1 Line #12 Volume 1 - 326 === page 359 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 33: Mortar Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 3584E76000 / 81MM Mortar, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $17.802 million supports procurement of 9,327 cartridges. TYPE CLASSIFICATION DATE: December 1986 LI 3584E76000 - 81MM Mortar, All Types Army UNCLASSIFIED Page 4 of 26 P-1 Line #12 Volume 1 - 327 === page 360 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3584E76000 / 81MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E18403 / CTG, 81mm Mortar HE, M821 Series w/MOFM [CA66] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - 53.931 - - - - - - - - - 53.931 - - - - - - - - - 53.931 - - - - - Gross/Weapon System Cost ($ in Millions) 472.696 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 472.696 Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) 472.696 FY 2026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost FY 2025 Total Cost Qty ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty ($) (Each) (Each) ($ M) 475.92 167,755 79.838 721.43 36,044 26.003 - - - - - - - - - - - - 92.18 172,787 15.927 114.73 37,125 4.259 - - - - - - - - - - - - 17.39 172,787 3.005 17.45 37,125 0.648 - - - - - - - - - - - - (†) 16.79 172,787 2.901 33.18 37,125 1.232 - - - - - - - - - - - - (†) 16.00 691,151 11.056 26.01 148,501 3.863 - - - - - - - - - - - - 266.81 182,144 48.597 244.27 37,125 9.069 - - - - - - - - - - - - 87.59 18,312 1.604 92.72 4,325 0.401 - - - - - - - - - - - - (†) 24.19 511,529 12.374 25.95 102,726 2.666 - - - - - - - - - - - - Subtotal: Recurring Cost - - 175.302 - - 48.140 - - - - - - - - - - - - - - 175.302 - - 48.140 - - - - - - - - - - - - Acceptance Test - - 0.295 - - 0.625 - - - - - - - - - - - - First Article Test - - 0.268 - - 0.875 - - - - - - - - - - - - Hardware Cost Recurring Cost LOAD, ASSEMBLE, (†) PACK (LAP) SHELL BODY, 81MM (†) HE M821A4 FIN MORTAR CTG (†) M24 F/81MM IGN CTG M299 PROPELLANT CHARGE, M658 FUZE MOFM, M734A1 (†) PBXW-12 BULK EXPLOSIVE (†) EXPLOSIVE FILL IMX-104 Subtotal: Hardware Cost Support - Acceptance Testing Cost LI 3584E76000 - 81MM Mortar, All Types Army UNCLASSIFIED Page 5 of 26 P-1 Line #12 Volume 1 - 328 === page 361 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3584E76000 / 81MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E18403 / CTG, 81mm Mortar HE, M821 Series w/MOFM [CA66] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) Subtotal: Support Acceptance Testing Cost FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 0.563 - - 1.500 - - - - - - - - - - - - Production Verification Test - - - - - 1.400 - - - - - - - - - - - - Subtotal: Support - Product Improvement Cost - - - - - 1.400 - - - - - - - - - - - - Support - Product Improvement Cost Support - Production Engineering Cost Production Engineering - - 296.831 - - 2.890 - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - 296.831 - - 2.890 - - - - - - - - - - - - Gross/Weapon System Cost - - 472.696 - - 53.931 - - - - - - - - - - - - (†) indicates the presence of a P-5a LI 3584E76000 - 81MM Mortar, All Types Army UNCLASSIFIED Page 6 of 26 P-1 Line #12 Volume 1 - 329 === page 362 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements LOAD, ASSEMBLE, PACK (LAP) SHELL BODY, 81MM HE M821A4 FIN MORTAR CTG M24 F/81MM IGN CTG M299 PROPELLANT CHARGE, M658 FUZE MOFM, M734A1 PBXW-12 BULK EXPLOSIVE EXPLOSIVE FILL IMX-104 O O C P-1 Line Item Number / Title: 3584E76000 / 81MM Mortar, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 GENERAL DYNAMICS ORD & TAC SYS / WILKES BARRE, PA C / IDIQ ROCK ISLAND ARSENAL, IL Sep 2025 Sep 2028 36,044 721.43 Y 2025 PREMIER PRECISION MACHINING LLC / FALCONER, NY C / IDIQ PICATINNY ARSENAL, NJ Sep 2025 Mar 2027 37,125 114.73 Y 2025 GLOBE TECH LLC. / PLYMOUTH, MI C / IDIQ PICATINNY ARSENAL, NJ Apr 2025 Oct 2026 37,125 17.45 Y 2025 NAMMO POCAL INC. / SCRANTON, PA SS / IDIQ ROCK ISLAND ARSENAL, IL Apr 2025 Oct 2026 37,125 33.18 Y 2025 GENERAL DYNAMICS ORD & TAC SYS / MARION, IL C / IDIQ ROCK ISLAND ARSENAL, IL Jun 2025 Dec 2026 148,501 26.01 Y 2025 L-3 FUZING & ORDANCE SYSTEMS INC / CINCINNATI, OH C / IDIQ PICATINNY ARSENAL, NJ Jul 2025 Jan 2027 37,125 244.27 Y 2025 BAE SYSTEMS ORDNANCE SYSTEMS INC / KINGSPORT, TN C / IDIQ ROCK ISLAND ARSENAL, IL Aug 2025 Aug 2026 4,325 92.72 Y 2025 BAE SYSTEMS ORDNANCE SYSTEMS INC / KINGSPORT, TN C / IDIQ ROCK ISLAND ARSENAL, IL Aug 2025 Aug 2026 102,726 25.95 Y LI 3584E76000 - 81MM Mortar, All Types Army Location of PCO Item Number / Title [DODIC]: E18403 / CTG, 81mm Mortar HE, M821 Series w/MOFM [CA66] UNCLASSIFIED Page 7 of 26 P-1 Line #12 (Each) RFP Issue Date Volume 1 - 330 === page 363 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3584E76000 / 81MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E18404 / CTG, 81mm Mortar HE, M889 Series w/PD Fuze [CA63] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 6.517 8.133 66.129 - 66.129 - Gross/Weapon System Cost ($ in Millions) 175.922 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 175.922 Plus CY Advance Procurement ($ in Millions) - - - - - 6.517 8.133 66.129 - 66.129 - Total Obligation Authority ($ in Millions) 175.922 FY 2027 Total - - - - - 6.517 8.133 66.129 - 66.129 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, (†) PACK (LAP) CHG PROP 81MM M220 (†) (†) IGN CTG M299 SHELL BODY, 81MM (†) HE FIN MORTAR CTG (†) M24 F/81MM FUZE POINT DETONATOR M783 (†) COMP B TYPE I GRADE A 84.20 107,392 9.042 215.78 6,986 1.507 251.99 9,394 2.367 288.29 68,296 19.689 - - - 288.29 68,296 19.689 11.93 442,454 5.278 17.43 28,782 0.502 26.11 38,703 1.011 20.51 281,379 5.771 - - - 20.51 281,379 5.771 14.99 110,613 1.658 33.18 7,196 0.239 45.18 9,676 0.437 35.08 70,345 2.468 - - - 35.08 70,345 2.468 51.01 110,613 5.643 151.67 7,196 1.091 129.75 9,676 1.255 154.59 70,345 10.875 - - - 154.59 70,345 10.875 16.42 110,613 1.816 17.45 7,196 0.126 27.46 9,676 0.266 28.03 70,345 1.972 - - - 28.03 70,345 1.972 184.69 110,613 20.430 179.06 7,196 1.289 48.50 9,676 0.469 232.14 70,345 16.330 - - - 232.14 70,345 16.330 - - - 15.10 20,958 0.316 - - - - - - - - - - - - 95.31 6,061 0.578 - - - 100.10 1,127 0.113 93.36 8,195 0.765 - - - 93.36 8,195 0.765 (†) 22.05 424,033 9.351 - - - 29.57 26,773 0.792 30.14 194,643 5.867 - - - 30.14 194,643 5.867 Subtotal: Recurring Cost - - 53.795 - - 5.070 - - 6.710 - - 63.736 - - - - - 63.736 - - 53.795 - - 5.070 - - 6.710 - - 63.736 - - - - - 63.736 PBXW-12 BULK EXPLOSIVE (†) EXPLOSIVE FILL IMX-104 Subtotal: Hardware Cost Support - Acceptance Testing Cost LI 3584E76000 - 81MM Mortar, All Types Army UNCLASSIFIED Page 8 of 26 P-1 Line #12 Volume 1 - 331 === page 364 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3584E76000 / 81MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E18404 / CTG, 81mm Mortar HE, M889 Series w/PD Fuze [CA63] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Acceptance Test - - 0.458 - - 0.642 - - 0.070 - - 0.448 - - - - - 0.448 First Article Test - - - - - - - - 0.198 - - 0.209 - - - - - 0.209 Subtotal: Support Acceptance Testing Cost - - 0.458 - - 0.642 - - 0.268 - - 0.657 - - - - - 0.657 Support - Production Engineering Cost Production Engineering - - 121.668 - - 0.805 - - 1.155 - - 1.735 - - - - - 1.735 Subtotal: Support Production Engineering Cost - - 121.668 - - 0.805 - - 1.155 - - 1.735 - - - - - 1.735 Gross/Weapon System Cost - - 175.922 - - 6.517 - - 8.133 - - 66.129 - - - - - 66.129 Remarks: Multiple new base contracts: pricing incorporates added risk due to economic environment resulting in increased labor and material costs. (†) indicates the presence of a P-5a LI 3584E76000 - 81MM Mortar, All Types Army UNCLASSIFIED Page 9 of 26 P-1 Line #12 Volume 1 - 332 === page 365 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 O O C Cost Elements LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) CHG PROP 81MM M220 CHG PROP 81MM M220 IGN CTG M299 IGN CTG M299 SHELL BODY, 81MM HE SHELL BODY, 81MM HE FIN MORTAR CTG M24 F/81MM FIN MORTAR CTG M24 F/81MM FUZE POINT DETONATOR M783 FUZE POINT DETONATOR M783 PBXW-12 BULK EXPLOSIVE PBXW-12 BULK EXPLOSIVE EXPLOSIVE FILL IMX-104 EXPLOSIVE FILL IMX-104 (†) P-1 Line Item Number / Title: 3584E76000 / 81MM Mortar, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E18404 / CTG, 81mm Mortar HE, M889 Series w/PD Fuze [CA63] Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 DAY & ZIMMERMANN KANSAS LLC / PARSONS, KS C / IDIQ ROCK ISLAND ARSENAL, IL Sep 2025 Sep 2028 6,986 215.78 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL May 2026 May 2028 9,394 251.99 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Jun 2027 Jun 2029 68,296 288.29 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 38,703 26.11 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 281,379 20.51 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 9,676 45.18 Y 2027 NAMMO POCAL INC. / SCRANTON, PA SS / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 70,345 35.08 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 9,676 129.75 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 70,345 154.59 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 9,676 27.46 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 70,345 28.03 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 9,676 48.50 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 70,345 232.14 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 1,127 100.10 Y 2027 BAE SYSTEMS ORDNANCE SYSTEMS INC / KINGSPORT, TN Option / IDIQ ROCK ISLAND ARSENAL, IL Jul 2027 Jul 2028 8,195 93.36 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 26,773 29.57 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 194,643 30.14 Y (Each) RFP Issue Date indicates the presence of a P-21 LI 3584E76000 - 81MM Mortar, All Types Army UNCLASSIFIED Page 10 of 26 P-1 Line #12 Volume 1 - 333 === page 366 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3584E76000 / 81MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E18404 / CTG, 81mm Mortar HE, M889 Series w/PD Fuze [CA63] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 107392 1 2025 ARMY 6.986 .000 6.986 A - - - - - - - - - - - - - 6.986 1 2025 MC (‡) 41.925 .000 41.925 A - - - - - - - - - - - - - 41.925 1 2025 Total 48.911 .000 48.911 - - - - - - - - - - - - - 48.911 2 2026 ARMY 9.394 .000 9.394 A - - - - - 9.394 2 2026 MC (‡) 35.486 .000 35.486 A - - - - - 35.486 2 2026 NSOF 2.540 .000 2.540 A - - - - - 2.540 2 2026 Total 47.420 .000 47.420 - - - - - 47.420 2 2027 ARMY 68.296 .000 68.296 2 2027 MC (‡) 72.505 .000 72.505 72.505 2 2027 Total 140.801 .000 140.801 140.801 (‡) 68.296 O C T LI 3584E76000 - 81MM Mortar, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 26 S E P O C T N O V D E C J A N F E B P-1 Line #12 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 334 === page 367 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3584E76000 / 81MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E18404 / CTG, 81mm Mortar HE, M889 Series w/PD Fuze [CA63] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 107392 1 2025 ARMY 6.986 .000 6.986 - - - - - - - - - - - - - - - - - - - - 6.986 .000 1 2025 MC (‡) 41.925 .000 41.925 - - - - - - - - - - - 12.000 12.000 12.000 5.925 - - - - - - - - - .000 1 2025 Total 48.911 .000 48.911 - - - - - - - - - - - 12.000 12.000 12.000 5.925 - - - - - - - - 6.986 .000 2 2026 ARMY 9.394 .000 9.394 - - - - - - - - - - - - - - - - - - - 9.394 - 2 2026 MC (‡) 35.486 .000 35.486 - - - - - - - - - - - - - - - - - - - 12.066 23.420 (‡) - - - 2 2026 NSOF 2.540 .000 2.540 - - - - - - - - - - - - - - - - - - - 2.540 2 2026 Total 47.420 .000 47.420 - - - - - - - - - - - - - - - - - - - 24.000 23.420 2 2027 ARMY 68.296 .000 68.296 A - - - - - - - - - - - - 2 2027 MC (‡) 72.505 .000 72.505 A - - - - - - - - - - - 2 2027 Total 140.801 .000 140.801 - - - - - - - - - - - O C T LI 3584E76000 - 81MM Mortar, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 26 S E P O C T N O V D E C J A N F E B P-1 Line #12 M A R A P R M A Y .000 .000 - .000 - - - .000 - - - - 68.296 - - - - - 72.505 - - - - - 140.801 J U N J U L A U G S E P Volume 1 - 335 === page 368 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3584E76000 / 81MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E18404 / CTG, 81mm Mortar HE, M889 Series w/PD Fuze [CA63] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 107392 1 2025 ARMY 6.986 6.986 .000 1 2025 MC (‡) 41.925 41.925 .000 1 2025 Total 48.911 48.911 .000 2 2026 ARMY 9.394 9.394 .000 .000 2 2026 MC (‡) 35.486 35.486 .000 .000 (‡) .000 .000 - - - - - - - - - - - - - - 2 2026 NSOF 2.540 2.540 .000 2 2026 Total 47.420 47.420 .000 - - - - - - - - 2 2027 ARMY 68.296 .000 68.296 - - - - - - - - 12.000 12.000 12.000 12.000 12.000 2 2027 MC (‡) 72.505 .000 72.505 - - - - - - - - 12.000 12.000 12.000 12.000 12.000 12.505 2 2027 Total 140.801 .000 140.801 - - - - - - - - 24.000 24.000 24.000 24.000 24.000 20.801 - - - - - - - - - - .000 .000 O C T LI 3584E76000 - 81MM Mortar, All Types Army N O V D E C J A N F E B M A R A P R M A Y - J U N - J U L - A U G UNCLASSIFIED Page 13 of 26 - S E P - O C T - - - - - - - - - - - 8.296 N O V .000 .000 .000 D E C J A N F E B P-1 Line #12 M A R A P R M A Y J U N J U L A U G - .000 S E P Volume 1 - 336 === page 369 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3584E76000 / 81MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E18404 / CTG, 81mm Mortar HE, M889 Series w/PD Fuze [CA63] Procurement Leadtime (Months) Initial ALT After Oct 1 Reorder MSR For 2027 1-8-5 For 2027 MAX For 2027 ALT Prior to Oct 1 1 DAY & ZIMMERMANN KANSAS LLC - PARSONS, KS 12,000 24,000 50,000 12 12 24 36 0 0 0 0 2 TO BE SELECTED - TO BE SELECTED 12,000 24,000 50,000 12 12 24 36 9 9 24 33 Manufacturer Name - Location Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 3584E76000 - 81MM Mortar, All Types Army UNCLASSIFIED Page 14 of 26 P-1 Line #12 Volume 1 - 337 === page 370 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3584E76000 / 81MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E69600 / CTG, 81mm FRTR, M879 Series w/Practice Fuze [C875] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 25.871 24.737 39.814 - 39.814 - Gross/Weapon System Cost ($ in Millions) 250.487 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 250.487 Plus CY Advance Procurement ($ in Millions) - - - - - 25.871 24.737 39.814 - 39.814 - Total Obligation Authority ($ in Millions) 250.487 FY 2027 Total - - - - - 25.871 24.737 39.814 - 39.814 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, (†) PACK (LAP) FUZE PRACTICE, M751 (†) SHELL BODY, 81MM (†) FRPC (†) IGN CTG M299 CHG PROP 81MM M220 (†) FIN MORTAR CTG 47.68 416,514 19.859 58.79 67,274 3.955 131.38 45,534 5.982 146.95 80,113 11.773 - - - 146.95 80,113 11.773 21.45 429,010 9.203 30.25 69,292 2.096 30.77 46,900 1.443 33.68 82,516 2.779 - - - 33.68 82,516 2.779 48.99 429,010 21.018 96.39 69,292 6.679 122.59 46,900 5.749 102.60 82,516 8.466 - - - 102.60 82,516 8.466 6.86 429,010 2.941 33.18 69,292 2.299 45.18 46,900 2.119 35.08 82,516 2.895 - - - 35.08 82,516 2.895 14.14 1,716,037 24.262 17.43 277,169 4.831 26.11 187,600 4.898 20.51 330,065 6.770 - - - 20.51 330,065 6.770 15.58 429,010 6.682 17.45 69,292 1.209 27.46 46,900 1.288 28.03 82,516 2.313 - - - 28.03 82,516 2.313 - - 83.966 - - 21.069 - - 21.480 - - 34.995 - - - - - 34.995 - - 83.966 - - 21.069 - - 21.480 - - 34.995 - - - - - 34.995 Acceptance Test - - 3.358 - - 0.670 - - 0.323 - - 0.552 - - - - - 0.552 First Article Test - - - - - 0.750 - - 0.656 - - 0.879 - - - - - 0.879 Subtotal: Support Acceptance Testing Cost - - 3.358 - - 1.420 - - 0.979 - - 1.431 - - - - - 1.431 (†) M24 F/81MM Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Product Improvement Cost LI 3584E76000 - 81MM Mortar, All Types Army UNCLASSIFIED Page 15 of 26 P-1 Line #12 Volume 1 - 338 === page 371 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3584E76000 / 81MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E69600 / CTG, 81mm FRTR, M879 Series w/Practice Fuze [C875] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Production Verification Test - - 4.540 - - 1.171 - - - - - - - - - - - - Subtotal: Support - Product Improvement Cost - - 4.540 - - 1.171 - - - - - - - - - - - - Support - Production Engineering Cost Production Engineering - - 158.624 - - 2.211 - - 2.279 - - 3.387 - - - - - 3.387 Subtotal: Support Production Engineering Cost - - 158.624 - - 2.211 - - 2.279 - - 3.387 - - - - - 3.387 Gross/Weapon System Cost - - 250.487 - - 25.871 - - 24.737 - - 39.814 - - - - - 39.814 Remarks: Multiple new base contracts: pricing incorporates added risk due to economic environment resulting in increased labor and material costs. (†) indicates the presence of a P-5a LI 3584E76000 - 81MM Mortar, All Types Army UNCLASSIFIED Page 16 of 26 P-1 Line #12 Volume 1 - 339 === page 372 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 O O C Cost Elements LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) FUZE PRACTICE, M751 FUZE PRACTICE, M751 FUZE PRACTICE, M751 SHELL BODY, 81MM FRPC SHELL BODY, 81MM FRPC SHELL BODY, 81MM FRPC IGN CTG M299 IGN CTG M299 IGN CTG M299 CHG PROP 81MM M220 CHG PROP 81MM M220 CHG PROP 81MM M220 FIN MORTAR CTG M24 F/81MM FIN MORTAR CTG M24 F/81MM FIN MORTAR CTG M24 F/81MM (†) P-1 Line Item Number / Title: 3584E76000 / 81MM Mortar, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E69600 / CTG, 81mm FRTR, M879 Series w/Practice Fuze [C875] Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 NAMMO POCAL INC. / SCRANTON, PA C / IDIQ PICATINNY ARSENAL, NJ Aug 2025 Aug 2027 67,274 58.79 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ May 2026 May 2028 45,534 131.38 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Jun 2027 Jun 2029 80,113 146.95 Y 2025 NAMMO POCAL INC. / SCRANTON, PA SS / IDIQ PICATINNY ARSENAL, NJ Mar 2025 Sep 2026 69,292 30.25 Y 2026 TO BE SELECTED / TO BE SELECTED Option / FFP PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 46,900 30.77 Y 2027 NAMMO POCAL INC. / SCRANTON, PA SS / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 82,516 33.68 Y 2025 PREMIER PRECISION MACHINING LLC / FALCONER, NY C / IDIQ PICATINNY ARSENAL, NJ Sep 2025 Mar 2027 69,292 96.39 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 46,900 122.59 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 82,516 102.60 Y 2025 NAMMO POCAL INC. / SCRANTON, PA SS / IDIQ ROCK ISLAND ARSENAL, IL Apr 2025 Oct 2026 69,292 33.18 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 46,900 45.18 Y 2027 NAMMO POCAL INC. / SCRANTON, PA SS / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 82,516 35.08 Y 2025 AMERICAN ORDNANCE LLC (IAAAP) / MIDDLETOWN, IA C / IDIQ ROCK ISLAND ARSENAL, IL Jun 2025 Dec 2026 277,169 17.43 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Apr 2026 Oct 2027 187,600 26.11 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 330,065 20.51 Y 2025 GLOBE TECH LLC. / PLYMOUTH, MI C / IDIQ PICATINNY ARSENAL, NJ Apr 2025 Oct 2026 69,292 17.45 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 46,900 27.46 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 82,516 28.03 Y (Each) RFP Issue Date indicates the presence of a P-21 LI 3584E76000 - 81MM Mortar, All Types Army UNCLASSIFIED Page 17 of 26 P-1 Line #12 Volume 1 - 340 === page 373 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 P-1 Line Item Number / Title: 3584E76000 / 81MM Mortar, All Types Item Number / Title [DODIC]: E69600 / CTG, 81mm FRTR, M879 Series w/Practice Fuze [C875] Remarks: Multiple new base contracts; pricing incorporates added risk due to increased labor and material costs. LI 3584E76000 - 81MM Mortar, All Types Army UNCLASSIFIED Page 18 of 26 P-1 Line #12 Volume 1 - 341 === page 374 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3584E76000 / 81MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E69600 / CTG, 81mm FRTR, M879 Series w/Practice Fuze [C875] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 416514 1 2025 ARMY 67.274 .000 67.274 A - - - - - - - - - - - - - - 1 2025 MC (‡) 67.817 .000 67.817 A - - - - - - - - - - - - - - 67.274 67.817 1 2025 Total 135.091 .000 135.091 - - - - - - - - - - - - - - 135.091 2 2026 ARMY 45.534 .000 45.534 A - - - - - 45.534 2 2026 MC (‡) 23.990 .000 23.990 A - - - - - 23.990 2 2026 Total 69.524 .000 69.524 - - - - - 69.524 2 2027 ARMY 80.113 .000 80.113 80.113 2 2027 MC (‡) 14.726 .000 14.726 14.726 2 2027 Total 94.839 .000 94.839 94.839 O C T LI 3584E76000 - 81MM Mortar, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 19 of 26 S E P O C T N O V D E C J A N F E B P-1 Line #12 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 342 === page 375 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3584E76000 / 81MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E69600 / CTG, 81mm FRTR, M879 Series w/Practice Fuze [C875] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 416514 1 2025 ARMY 67.274 .000 67.274 - - - - - - - - - - 16.000 16.000 16.000 12.916 1 2025 MC (‡) 67.817 .000 67.817 - - - - - - - - - - 8.000 1 2025 Total 135.091 .000 135.091 - - - - - - - - - - 24.000 24.000 24.000 20.916 24.000 18.175 2 2026 ARMY 45.534 .000 45.534 - - - - - - - - - - - - - - - 2 2026 MC (‡) 23.990 .000 23.990 - - - - - - - - - - - - - - 2 2026 Total 69.524 .000 69.524 - - - - - - - - - - - - - 2 2027 ARMY 80.113 .000 80.113 A - - - - 2 2027 MC (‡) 14.726 .000 14.726 A - - - 2 2027 Total 94.839 .000 94.839 - - - O C T LI 3584E76000 - 81MM Mortar, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 20 of 26 8.000 S E P 8.000 6.358 - .000 8.000 17.642 18.175 .000 - - - - - - - 12.000 12.000 21.534 - - - - - 12.000 11.990 - - - - - - 24.000 23.990 21.534 - - - - - - - - - - - - - - - - - - - - - - - - - - - O C T N O V D E C J A N F E B P-1 Line #12 M A R A P R - M A Y - J U N - - - .000 .000 - .000 - - .000 - - - 80.113 - - - - 14.726 - - - - 94.839 J U L A U G S E P Volume 1 - 343 === page 376 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3584E76000 / 81MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E69600 / CTG, 81mm FRTR, M879 Series w/Practice Fuze [C875] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 416514 1 2025 ARMY 67.274 67.274 .000 1 2025 MC (‡) 67.817 67.817 .000 .000 1 2025 Total 135.091 135.091 .000 2 2026 ARMY 45.534 45.534 .000 2 2026 MC (‡) 23.990 23.990 .000 2 2026 Total 69.524 69.524 .000 - - - - - - - - 2 2027 ARMY 80.113 .000 80.113 - - - - - - - - 10.000 24.000 24.000 22.113 2 2027 MC (‡) 14.726 .000 14.726 - - - - - - - - 14.726 2 2027 Total 94.839 .000 94.839 - - - - - - - - 24.726 24.000 24.000 22.113 .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 .000 .000 O C T LI 3584E76000 - 81MM Mortar, All Types Army N O V D E C J A N F E B M A R A P R M A Y - J U N - - J U L - A U G UNCLASSIFIED Page 21 of 26 - - - - - - - - - - - - .000 S E P .000 .000 O C T N O V D E C J A N F E B P-1 Line #12 M A R A P R M A Y J U N J U L A U G - .000 S E P Volume 1 - 344 === page 377 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3584E76000 / 81MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E69600 / CTG, 81mm FRTR, M879 Series w/Practice Fuze [C875] Procurement Leadtime (Months) Initial ALT After Oct 1 Reorder MSR For 2027 1-8-5 For 2027 MAX For 2027 ALT Prior to Oct 1 1 NAMMO POCAL INC. SCRANTON, PA 12,000 24,000 50,000 11 11 24 35 9 9 24 33 2 TO BE SELECTED - TO BE SELECTED 12,000 24,000 50,000 11 11 24 35 9 9 24 33 Manufacturer Name - Location Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 3584E76000 - 81MM Mortar, All Types Army UNCLASSIFIED Page 22 of 26 P-1 Line #12 Volume 1 - 345 === page 378 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3584E76000 / 81MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E76100 / CTG, 81mm Mortar VL ILLUM, M853 Series w/MTSQ Fuze [C871] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 8.969 8.916 17.802 - 17.802 - Gross/Weapon System Cost ($ in Millions) 106.340 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 106.340 Plus CY Advance Procurement ($ in Millions) - - - - - 8.969 8.916 17.802 - 17.802 - Total Obligation Authority ($ in Millions) 106.340 FY 2027 Total - - - - - 8.969 8.916 17.802 - 17.802 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, (†) PACK (LAP) FUZE MTSQ, M772 (†) BODY TUBE, 81MM ILLUM (†) TAIL CONE, 81MM ILLUM (†) (†) IGN CTG M752 CHG PROP 81MM M219 (†) FIN MORTAR CTG M28 F/81MM M819 (†) RP ILLUM CANDLE VL (†) F/81MM M853A1 PARACHUTE, (†) 81MM FIBER CONTAINER (†) PA 162, 81MM 284.73 93,296 26.564 364.79 4,900 1.787 376.07 4,612 1.734 383.86 9,327 3.580 - - - 383.86 9,327 3.580 281.12 96,095 27.015 237.12 5,047 1.197 339.61 4,750 1.613 340.88 9,606 3.274 - - - 340.88 9,606 3.274 42.76 96,095 4.109 65.33 5,047 0.330 65.32 4,750 0.310 66.67 9,606 0.640 - - - 66.67 9,606 0.640 20.89 96,095 2.008 39.26 5,047 0.198 44.16 4,750 0.210 45.07 9,606 0.433 - - - 45.07 9,606 0.433 25.17 96,095 2.418 43.81 5,047 0.221 44.73 4,750 0.212 44.72 9,606 0.430 - - - 44.72 9,606 0.430 13.33 384,380 5.122 22.67 20,188 0.458 27.24 19,001 0.518 20.51 38,427 0.788 - - - 20.51 38,427 0.788 17.58 96,095 1.689 27.59 5,047 0.139 28.16 4,750 0.134 28.75 9,606 0.276 - - - 28.75 9,606 0.276 235.43 96,095 22.623 496.39 5,047 2.505 511.75 4,750 2.431 522.35 9,606 5.018 - - - 522.35 9,606 5.018 30.09 96,085 2.891 54.96 5,047 0.277 54.00 4,750 0.257 55.10 9,606 0.529 - - - 55.10 9,606 0.529 6.20 96,095 0.596 12.14 5,047 0.061 12.62 4,750 0.060 18.74 9,606 0.180 - - - 18.74 9,606 0.180 LI 3584E76000 - 81MM Mortar, All Types Army UNCLASSIFIED Page 23 of 26 P-1 Line #12 Volume 1 - 346 === page 379 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3584E76000 / 81MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E76100 / CTG, 81mm Mortar VL ILLUM, M853 Series w/MTSQ Fuze [C871] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost METAL CONTAINER ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 65.03 32,564 2.118 127.84 1,666 0.213 131.79 1,568 0.207 134.53 3,171 0.427 - - - 134.53 3,171 0.427 - - 97.154 - - 7.387 - - 7.685 - - 15.576 - - - - - 15.576 - - 97.154 - - 7.387 - - 7.685 - - 15.576 - - - - - 15.576 Acceptance Test - - 1.242 - - 0.337 - - 0.165 - - 0.185 - - - - - 0.185 First Article Test - - 0.296 - - 0.207 - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 1.538 - - 0.544 - - 0.165 - - 0.185 - - - - - 0.185 (†) PA 157, 81MM Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Production Engineering Cost Production Engineering - - 7.649 - - 1.038 - - 1.065 - - 2.042 - - - - - 2.042 Subtotal: Support Production Engineering Cost - - 7.649 - - 1.038 - - 1.065 - - 2.042 - - - - - 2.042 Gross/Weapon System Cost - - 106.340 - - 8.969 - - 8.916 - - 17.802 - - - - - 17.802 Remarks: Multiple new base contracts: pricing incorporates added risk due to economic environment resulting in increased labor and material costs. (†) indicates the presence of a P-5a LI 3584E76000 - 81MM Mortar, All Types Army UNCLASSIFIED Page 24 of 26 P-1 Line #12 Volume 1 - 347 === page 380 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) FUZE MTSQ, M772 FUZE MTSQ, M772 FUZE MTSQ, M772 BODY TUBE, 81MM ILLUM BODY TUBE, 81MM ILLUM BODY TUBE, 81MM ILLUM TAIL CONE, 81MM ILLUM TAIL CONE, 81MM ILLUM TAIL CONE, 81MM ILLUM IGN CTG M752 IGN CTG M752 IGN CTG M752 CHG PROP 81MM M219 CHG PROP 81MM M219 CHG PROP 81MM M219 FIN MORTAR CTG M28 F/81MM M819 RP O O C P-1 Line Item Number / Title: 3584E76000 / 81MM Mortar, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 PINE BLUFF ARSENAL / PINE BLUFF, AR PO PICATINNY ARSENAL, NJ Sep 2025 Jan 2028 4,900 364.79 Y 2026 PINE BLUFF ARSENAL / PINE BLUFF, AR PO PICATINNY ARSENAL, NJ Feb 2026 Jun 2028 4,612 376.07 Y 2027 PINE BLUFF ARSENAL / PINE BLUFF, AR PO PICATINNY ARSENAL, NJ Feb 2027 Jun 2029 9,327 383.86 Y 2025 JUNGHANS MICROTEC GMBH / DUNNINGEN, GERMANY SS / IDIQ ROCK ISLAND ARSENAL, IL Jul 2025 Jan 2027 5,047 237.12 Y 2026 TO BE SELECTED / TO BE SELECTED C / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Oct 2027 4,750 339.61 Y 2027 JUNGHANS MICROTEC GMBH / DUNNINGEN, GERMANY SS / IDIQ ROCK ISLAND ARSENAL, IL Feb 2027 Aug 2028 9,606 340.88 Y 2025 LEWIS ENGINEERING COMPANY / MARSHALL, TX SS / IDIQ PICATINNY ARSENAL, NJ Jul 2025 Jan 2027 5,047 65.33 Y 2026 LEWIS ENGINEERING COMPANY / MARSHALL, TX SS / IDIQ PICATINNY ARSENAL, NJ May 2026 Nov 2027 4,750 65.32 Y 2027 LEWIS ENGINEERING COMPANY / MARSHALL, TX SS / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 9,606 66.67 Y 2025 LEWIS ENGINEERING COMPANY / MARSHALL, TX SS / IDIQ PICATINNY ARSENAL, NJ Jul 2025 Jan 2027 5,047 39.26 Y 2026 LEWIS ENGINEERING COMPANY / MARSHALL, TX SS / IDIQ PICATINNY ARSENAL, NJ May 2026 Nov 2027 4,750 44.16 Y 2027 LEWIS ENGINEERING COMPANY / MARSHALL, TX SS / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 9,606 45.07 Y 2025 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 5,047 43.81 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 4,750 44.73 Y 2027 NAMMO POCAL INC. / SCRANTON, PA SS / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 9,606 44.72 Y 2025 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 20,188 22.67 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 19,001 27.24 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 38,427 20.51 Y 2025 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 5,047 27.59 Y LI 3584E76000 - 81MM Mortar, All Types Army Location of PCO Item Number / Title [DODIC]: E76100 / CTG, 81mm Mortar VL ILLUM, M853 Series w/MTSQ Fuze [C871] UNCLASSIFIED Page 25 of 26 P-1 Line #12 (Each) RFP Issue Date Volume 1 - 348 === page 381 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements O O C P-1 Line Item Number / Title: 3584E76000 / 81MM Mortar, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location FIN MORTAR CTG M28 F/81MM M819 RP 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 4,750 28.16 Y FIN MORTAR CTG M28 F/81MM M819 RP 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 9,606 28.75 Y ILLUM CANDLE VL F/81MM M853A1 2025 CRANE ARMY AMMO ACTIVITY / CRANE, IN PO PICATINNY ARSENAL, NJ Aug 2025 Apr 2027 5,047 496.39 Y ILLUM CANDLE VL F/81MM M853A1 2026 CRANE ARMY AMMO ACTIVITY / CRANE, IN PO PICATINNY ARSENAL, NJ Feb 2026 Oct 2027 4,750 511.75 Y ILLUM CANDLE VL F/81MM M853A1 2027 CRANE ARMY AMMO ACTIVITY / CRANE, IN PO PICATINNY ARSENAL, NJ Feb 2027 Oct 2028 9,606 522.35 Y 2025 YOLAND CORPORATION / BROOKLYN, NY SS / IDIQ ROCK ISLAND ARSENAL, IL Jun 2025 Dec 2026 5,047 54.96 Y 2026 YOLAND CORPORATION / BROOKLYN, NY SS / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 4,750 54.00 Y 2027 YOLAND CORPORATION / BROOKLYN, NY SS / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 9,606 55.10 Y FIBER CONTAINER PA 162, 81MM 2025 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 5,047 12.14 Y FIBER CONTAINER PA 162, 81MM 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 4,750 12.62 Y FIBER CONTAINER PA 162, 81MM 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 9,606 18.74 Y METAL CONTAINER PA 157, 81MM 2025 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 1,666 127.84 Y METAL CONTAINER PA 157, 81MM 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 1,568 131.79 Y METAL CONTAINER PA 157, 81MM 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 3,171 134.53 Y PARACHUTE, 81MM PARACHUTE, 81MM PARACHUTE, 81MM Location of PCO Item Number / Title [DODIC]: E76100 / CTG, 81mm Mortar VL ILLUM, M853 Series w/MTSQ Fuze [C871] (Each) RFP Issue Date Remarks: Overall cost increase for 81MM VL Illum M853A1 is attributed to candle component and metal containers cost increase. Candle component cost increases are due to raw materials, increase in labor, and testing. Metal containers cost increase is attributed price of raw materials. LI 3584E76000 - 81MM Mortar, All Types Army UNCLASSIFIED Page 26 of 26 P-1 Line #12 Volume 1 - 349 === page 382 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 33: Mortar Ammunition P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 2,724.060 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 2,724.060 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 2,724.060 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 166.355 166.355 166.355 127.144 127.144 127.144 192.826 - - 192.826 - - 192.826 - 192.826 192.826 192.826 145.018 145.018 145.018 146.848 146.848 146.848 132.705 132.705 132.705 To FY 2031 Complete 134.029 134.029 134.029 Total - 3,768.985 - 3,768.985 - 3,768.985 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line item includes 120mm Mortars, All Types. The 120mm Mortar Cartridges are designed for use with the M120, 120mm Towed Mortar System and the M121 Carrier Mortar System as well as use with the Brigade Combat Team Mortar System. (E25502) CTG, MORTAR, 120mm HE M933 SERIES W/PD FUZE The M933A1 120mm High Explosive (HE) cartridge with the M783 Point Detonating/ Delay (PD/DLY) Fuze is used against personnel, bunker and light materiel targets. It consists of a Steel Shell Body with Composition B fill, and an aluminum M31 Fin Assembly. The propulsion system utilizes the M1020 Ignition Cartridge and four horseshoe-shaped, water-resistant M234 Propelling Charges. The M933A1 HE (range 200 meters minimum to 7,200 meters maximum) is used with the new M783 dual safety, Point Detonating/Delay Fuze. This round is used primarily in training because it is significantly less expensive than the M934A1, the preferred war fighting round. However, the M933A1 is lethal and can be used in combat. This item is Code A, approved for service use. (E25503) CTG, MORTAR, 120mm VL ILLUM M930 SERIES W/ MTSQ FUZE The 120mm M930 Visible Light (VL) Illumination Cartridge is a fin stabilized mortar cartridge that consists of a M776 Mechanical Time Super Quick (MTSQ) Fuze, a Steel 2-piece Shell Body that contains the Parachute, Canister, and a Fin Assembly. The payload is base ejected and upon ignition produces (VL) illumination, which allows for monitoring of enemy activities, and adjustment of fire at greater observation instances during night operations. It also provides a means for day/night signaling. The M930 VL Cartridge (range 400 meters minimum to 6,900 meters maximum) illuminates to the full range of the M934A1 high explosive round, which allows adjustment of fire at any distance out to the maximum range, and provides a significant increase in illumination intensity, and effectiveness over the 4.2-inch cartridge that it replaces. This item is Code A, approved for service use. (E25507) CTG, MORTAR, 120mm FRTR M931 SERIES W/PRACTICE FUZE The M931 is a low-cost, full range, training round (FRTR) that will replace a percentage of the standard HE cartridges used in 120mm mortar training. The M931 (range 200 meters minimum to 7,200 meters maximum) has been designed to provide the user with realistic training for 120mm Mortar crews at a fraction of the cost. It is identical in shape, size, and weight to the M933A1/M934A1 HE cartridges. The M931 is equipped with M781 PD Practice Fuze which produces a flash, bang, and smoke signature that provides audio/visual feedback to the mortar crew and forward observer. This item is Code A, approved for service use. LI 6780E25500 - 120MM Mortar, All Types Army UNCLASSIFIED Page 1 of 38 P-1 Line #13 Volume 1 - 350 === page 383 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 33: Mortar Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A (E91300) CTG, MORTAR, 120mm WP SMOKE M929 SERIES W/MOFM The 120mm M929 White Phosphorous (WP) Smoke Cartridge is used to provide smoke, with some incendiary effect for various screening missions. The cartridge is filled with five pounds of WP. The M929 uses the highly reliable, and robust electronic countermeasure resistant M734A1 Multi-Option Fuze for Mortars (MOFM), which when functions, detonates the burster, and disperses the WP soaked felt pads over the target. The smoke obscuration is generated by a spontaneous reaction between the WP and oxygen. The M929 (range 200 meters minimum and 7,200 meters maximum) is range-matched to the 120mm HE, and Illumination cartridges. This item is Code A, approved for service use. (E91400) CTG, MORTAR, 120mm HE M934 SERIES W/MOFM FUZE The M934A1 120mm HE cartridge with the M734A1 Multi-Option Fuze is used against personnel, bunker, and light materiel targets. It consists of a Steel Shell Body with Composition B fill, and aluminum M31 Fin Assembly. The propulsion system utilizes the M1020 Ignition Cartridge, and four horseshoe-shaped, water-resistant M234 Propelling Charges. The M934A1 HE (range 200 meters minimum to 7,200 meters maximum) uses the highly reliable, and countermeasure resistant M734A1 Multi-Option Fuze. The proximity setting will burst the cartridge at a height over the target that is optimized for lethality. This item is Code A, approved for service use. (E91500) CTG, MORTAR, 120mm IR ILLUM M983 SERIES W/ MTSQ FUZE The 120mm M983 Infra-red (IR) Illumination Cartridge is ballistically similar to the M930 Visible Light Illumination cartridge except for the chemical composition of the illuminating material and provides a field of view equal or greater to that of the M930 VL Cartridge. The M983 Cartridge is a fin stabilized, mortar cartridge that consists of the M776 Mechanical Time Super Quick (MTSQ) Fuze, a Steel 2-piece Shell Body, and a Fin Assembly. The payload is base ejected. Compared to the 120mm M930 Visible Light (VL) Illumination Cartridge, the M983 Infrared (IR) Illumination Cartridge produces minimal visible light. This reduces the risk of exposing forward friendly troop positions and enables covert fire adjustment at greater observation distances using passive night vision devices (NVDs). The M983 IR (range 375 meters minimum to 6,675 meters maximum) illuminates to the full range of the M934A1 HE cartridge. The item is Code A, approved for service use. LI 6780E25500 - 120MM Mortar, All Types Army UNCLASSIFIED Page 2 of 38 P-1 Line #13 Volume 1 - 351 === page 384 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 33: Mortar Ammunition P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD P-5 E25502 / CTG, 120mm Mortar HE, M933 Series w/PD Fuze [CA44] P-5 E25503 / CTG, 120mm Mortar VL ILLM, M930 Series w/MTSQ Fuze [C625] P-5a A P-5 E25507 / CTG, 120mm Mortar FRTR, M931 Series w/Pract Fuze [CA09] P-5a, P-21 A P-5 E91300 / CTG, 120mm Mortar WP Smoke, M929 Series w/MOFM [CA03] P-5a, P-21 A P-5 E91400 / CTG, 120mm Mortar HE, M934 Series w/MOFM [CA04] P-5a, P-21 A P-5 E91500 / CTG, 120mm Mortar IR ILLUM, M983 Series w/MTSQ [CA07] P-5a A P-40 Total Gross/Weapon System Cost MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) A - / 548.766 - / 1.436 - / 0.072 - / 488.556 - / 36.796 - / 11.155 - / 831.810 - / 52.411 - / 43.277 - / 365.231 - / 18.948 - - / 244.615 - / 55.801 - - / 245.082 / 2,724.060 - / 0.963 / 166.355 - - / - - / - / 9.522 - / - - / 106.641 - / - - / 106.641 / 19.367 - / 20.357 - / - - / 20.357 / 50.004 - / 51.484 - / - - / 51.484 / 4.822 - / - / 192.826 - / - - / 3.269 / 127.144 - - - / / 9.522 / 4.822 / 192.826 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 Base Budget supports critical Army Title 10 war reserve/operational, training, and test requirements in accordance with Department of Defense Instruction 3000.04 (Munitions Requirements Process) and Army Regulation 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War (OSW), approved Combatant Commander operational plans, homeland security, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support development, safety testing, fielding, and quality assurance. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active, and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. FY 2027 Total Base dollars in the amount of $192.826 million supports the procurement of 184,190 cartridges. (E25502) CTG, MORTAR, 120mm HE M933 SERIES W/PD FUZE This is a training standard item used in training and combat. There is no FY 2027 budget request for this funding line. TYPE CLASSIFICATION DATE: 2009 (E25503) CTG, MORTAR, 120mm VL ILLUM M930 SERIES W/MTSQ FUZE This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $9.522 million supports production of 3,306 cartridges. TYPE CLASSIFICATION DATE: 2003 (E25507) CTG, MORTAR, 120mm FRTR M931 SERIES W/PRACTICE FUZE This is a training unique item not used in combat. FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $106.641 million supports the procurement of 138,530 cartridges. LI 6780E25500 - 120MM Mortar, All Types Army UNCLASSIFIED Page 3 of 38 P-1 Line #13 Volume 1 - 352 === page 385 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 33: Mortar Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A TYPE CLASSIFICATION DATE: 1996 (E91300) CTG, MORTAR, 120nn WP SMOKE M929 SERIES W/MOFM FUZE This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $20.357 million supports the procurement of 7,513 cartridges. TYPE CLASSIFICATION DATE: 1996 (E91400) CTG, MORTAR, 120mm HE M934 SERIES W/MOFM FUZE This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $51.484 million supports production of 33,208 cartridges. TYPE CLASSIFICATION DATE: 2009 (E91500) CTG, MORTAR, 120mm IR ILLUM M983 SERIES W/MTSQ FUZE This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $4.822 million supports the procurement of 1,633 cartridges. TYPE CLASSIFICATION DATE: 2000 LI 6780E25500 - 120MM Mortar, All Types Army UNCLASSIFIED Page 4 of 38 P-1 Line #13 Volume 1 - 353 === page 386 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E25502 / CTG, 120mm Mortar HE, M933 Series w/PD Fuze [CA44] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC FY 2027 Total - FY 2026 - - - - 1.436 0.072 - - - - - - - - 1.436 0.072 - - - - - - - - 1.436 0.072 - - - - Gross/Weapon System Cost ($ in Millions) 548.766 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 548.766 Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) 548.766 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost FY 2025 Total Cost Qty ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty ($) (Each) (Each) ($ M) LOAD, ASSEMBLE, PACK (LAP) 272.89 131,768 35.958 - - - - - - - - - - - - - - - FIN ASSEMBLY, M31 80.17 135,721 10.880 - - - - - - - - - - - - - - - IGNITION CARTRIDGE, M1020 23.52 257,420 6.053 - - - - - - - - - - - - - - - PROPELLANT CHARGE, M234A1 38.11 542,885 20.691 - - - - - - - - - - - - - - - SHELL BODY, 120MM HE 220.59 135,721 29.938 - - - - - - - - - - - - - - - FUZE POINT DETONATOR M783 393.59 107,157 42.176 - - - - - - - - - - - - - - - COMP B TYPE I GRADE A 12.24 961,020 11.760 - - - - - - - - - - - - - - - PBXW-12 BULK EXPLOSIVE 88.25 8,316 0.734 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 158.190 - - - - - - - - - - - - - - - - - 158.190 - - - - - - - - - - - - - - - Acceptance Test - - 1.372 - - - - - - - - - - - - - - - First Article Test - - 0.046 - - - - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 1.418 - - - - - - - - - - - - - - - Hardware Cost Recurring Cost Subtotal: Hardware Cost Support - Acceptance Testing Cost LI 6780E25500 - 120MM Mortar, All Types Army UNCLASSIFIED Page 5 of 38 P-1 Line #13 Volume 1 - 354 === page 387 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E25502 / CTG, 120mm Mortar HE, M933 Series w/PD Fuze [CA44] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Support - Product Improvement Cost Reliability Subtotal: Support - Product Improvement Cost - - 1.664 - - - - - - - - - - - - - - - - - 1.664 - - - - - - - - - - - - - - - Support - Production Engineering Cost Production Engineering - - 387.494 - - 1.436 - - 0.072 - - - - - - - - - Subtotal: Support Production Engineering Cost - - 387.494 - - 1.436 - - 0.072 - - - - - - - - - Gross/Weapon System Cost - - 548.766 - - 1.436 - - 0.072 - - - - - - - - - LI 6780E25500 - 120MM Mortar, All Types Army UNCLASSIFIED Page 6 of 38 P-1 Line #13 Volume 1 - 355 === page 388 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E25503 / CTG, 120mm Mortar VL ILLM, M930 Series w/MTSQ Fuze [C625] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 36.796 11.155 9.522 - 9.522 - Gross/Weapon System Cost ($ in Millions) 488.556 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 488.556 Plus CY Advance Procurement ($ in Millions) - - - - - 36.796 11.155 9.522 - 9.522 - Total Obligation Authority ($ in Millions) 488.556 FY 2027 Total - - - - - 36.796 11.155 9.522 - 9.522 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements Qty FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) Total Cost ($) (Each) ($ M) (†) 405.64 174,304 70.704 454.36 11,120 5.052 485.20 4,155 2.016 520.90 3,306 1.722 - - - 520.90 3,306 1.722 IGNITION CARTRIDGE, 26.44 79,143 2.092 35.57 21,239 0.755 34.23 4,280 0.147 39.17 3,405 0.133 - - - 39.17 3,405 0.133 26.90 260,265 7.000 37.17 45,814 1.703 46.87 17,119 0.802 47.85 13,620 0.652 - - - 47.85 13,620 0.652 313.49 179,533 56.282 682.00 11,454 7.812 759.00 4,280 3.249 774.72 3,405 2.638 - - - 774.72 3,405 2.638 41.10 182,623 7.505 43.35 21,239 0.921 44.31 4,280 0.190 45.22 3,405 0.154 - - - 45.22 3,405 0.154 74.62 169,808 12.671 136.38 10,548 1.439 140.60 2,161 0.304 143.52 1,719 0.247 - - - 143.52 1,719 0.247 56.32 182,623 10.284 87.89 11,454 1.007 87.64 4,280 0.375 89.45 3,405 0.305 - - - 89.45 3,405 0.305 14.86 182,623 2.715 31.12 21,754 0.677 35.88 4,280 0.154 36.63 3,405 0.125 - - - 36.63 3,405 0.125 168.46 182,623 30.765 348.23 21,239 7.396 325.05 4,280 1.391 362.29 3,405 1.234 - - - 362.29 3,405 1.234 Hardware Cost Recurring Cost LOAD, ASSEMBLE, PACK (LAP) (†) M1020 PROPELLANT (†) CHARGE, M234A1 VL ILLUM CANNISTER, 120MM (†) FIN ASSEMBLY, M31 (†) METAL CONTAINER PA 154, 120MM (†) PARACHUTE, 120MM (†) FIBER CONTAINER PA 167, 120MM 120MM ILLUM BODY (†) (†) LI 6780E25500 - 120MM Mortar, All Types Army UNCLASSIFIED Page 7 of 38 P-1 Line #13 Volume 1 - 356 === page 389 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E25503 / CTG, 120mm Mortar VL ILLM, M930 Series w/MTSQ Fuze [C625] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years FUZE MTSQ, M776 (†) FY 2026 (Each) 649,758 166.176 267.61 21,239 5.684 300.90 4,280 1.288 307.22 3,405 1.046 - - - 307.22 3,405 1.046 Subtotal: Recurring Cost ($ M) ($) (Each) ($ M) Unit Cost ($) Qty (Each) Unit Cost ($ M) ($) Total Cost FY 2027 Total 255.75 Qty Total Cost FY 2027 OOC ($) Unit Cost Total Cost FY 2027 Base Qty Unit Cost Cost Elements FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 366.196 - - 32.445 - - 9.915 - - 8.255 - - - - - 8.255 - - 366.196 - - 32.445 - - 9.915 - - 8.255 - - - - - 8.255 Acceptance Test - - 96.438 - - 1.179 - - 0.145 - - 0.175 - - - - - 0.175 First Article Test - - 0.072 - - 1.290 - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 96.510 - - 2.469 - - 0.145 - - 0.175 - - - - - 0.175 Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Production Engineering Cost Production Engineering - - 25.852 - - 1.882 - - 1.095 - - 1.092 - - - - - 1.092 Subtotal: Support Production Engineering Cost - - 25.852 - - 1.882 - - 1.095 - - 1.092 - - - - - 1.092 Gross/Weapon System Cost - - 488.556 - - 36.796 - - 11.155 - - 9.522 - - - - - 9.522 Remarks: Multiple new base contracts: pricing incorporates added risk due to economic environment resulting in increased labor and material costs. (†) indicates the presence of a P-5a LI 6780E25500 - 120MM Mortar, All Types Army UNCLASSIFIED Page 8 of 38 P-1 Line #13 Volume 1 - 357 === page 390 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements O O C P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 PINE BLUFF ARSENAL / PINE BLUFF, AR PO PICATINNY ARSENAL, NJ Apr 2025 Oct 2027 11,120 454.36 Y 2026 PINE BLUFF ARSENAL / PINE BLUFF, AR PO PICATINNY ARSENAL, NJ Feb 2026 Aug 2028 4,155 485.20 Y 2027 PINE BLUFF ARSENAL / PINE BLUFF, AR PO PICATINNY ARSENAL, NJ Feb 2027 Aug 2029 3,306 520.90 Y 2025 NAMMO POCAL INC. / SCRANTON, PA SS / IDIQ ROCK ISLAND ARSENAL, IL Apr 2025 Oct 2026 21,239 35.57 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Aug 2027 4,280 34.23 Y 2027 NAMMO POCAL INC. / SCRANTON, PA SS / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 3,405 39.17 Y 2025 GENERAL DYNAMICS ORD & TAC SYS / MARION, IL C / IDIQ ROCK ISLAND ARSENAL, IL Jun 2025 Dec 2026 45,814 37.17 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Aug 2027 17,119 46.87 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 13,620 47.85 Y 2025 CRANE ARMY AMMO ACTIVITY / CRANE, IN PO PICATINNY ARSENAL, NJ Aug 2025 Apr 2027 11,454 682.00 Y 2026 CRANE ARMY AMMO ACTIVITY / CRANE, IN PO PICATINNY ARSENAL, NJ Feb 2026 Oct 2027 4,280 759.00 Y 2027 CRANE ARMY AMMO ACTIVITY / CRANE, IN PO PICATINNY ARSENAL, NJ Feb 2027 Oct 2028 3,405 774.72 Y 2025 MACHINING TECHNOLOGIES INC / SALISBURY, MD SS / IDIQ ROCK ISLAND ARSENAL, IL Dec 2024 Jun 2026 21,239 43.35 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Aug 2027 4,280 44.31 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 3,405 45.22 Y METAL CONTAINER PA 154, 120MM 2025 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 10,548 136.38 Y METAL CONTAINER PA 154, 120MM 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Aug 2027 2,161 140.60 Y METAL CONTAINER PA 154, 120MM 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 1,719 143.52 Y 2025 YOLAND CORPORATION / BROOKLYN, NY SS / IDIQ ROCK ISLAND ARSENAL, IL Jun 2025 Dec 2026 11,454 87.89 Y LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) IGNITION CARTRIDGE, M1020 IGNITION CARTRIDGE, M1020 IGNITION CARTRIDGE, M1020 PROPELLANT CHARGE, M234A1 PROPELLANT CHARGE, M234A1 PROPELLANT CHARGE, M234A1 VL ILLUM CANNISTER, 120MM VL ILLUM CANNISTER, 120MM VL ILLUM CANNISTER, 120MM FIN ASSEMBLY, M31 FIN ASSEMBLY, M31 FIN ASSEMBLY, M31 PARACHUTE, 120MM LI 6780E25500 - 120MM Mortar, All Types Army Location of PCO Item Number / Title [DODIC]: E25503 / CTG, 120mm Mortar VL ILLM, M930 Series w/MTSQ Fuze [C625] UNCLASSIFIED Page 9 of 38 P-1 Line #13 (Each) RFP Issue Date Volume 1 - 358 === page 391 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements O O C P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 YOLAND CORPORATION / BROOKLYN, NY SS / IDIQ ROCK ISLAND ARSENAL, IL Feb 2026 Aug 2027 4,280 87.64 Y 2027 YOLAND CORPORATION / BROOKLYN, NY SS / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 3,405 89.45 Y FIBER CONTAINER PA 167, 120MM 2025 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 21,754 31.12 Y FIBER CONTAINER PA 167, 120MM 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Aug 2027 4,280 35.88 Y FIBER CONTAINER PA 167, 120MM 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 3,405 36.63 Y 2025 PREMIER PRECISION MACHINING LLC / FALCONER, NY C / IDIQ PICATINNY ARSENAL, NJ Sep 2025 Mar 2027 21,239 348.23 Y 2026 GENERAL DYNAMICS ORD & TAC / WILKES BARRE, PA Option / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Aug 2027 4,280 325.05 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Feb 2027 Aug 2028 3,405 362.29 Y 2025 JUNGHANS MICROTEC GMBH / DUNNINGEN, GERMANY SS / IDIQ ROCK ISLAND ARSENAL, IL Jul 2025 Mar 2027 21,239 267.61 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Aug 2027 4,280 300.90 Y 2027 JUNGHANS MICROTEC GMBH / DUNNINGEN, GERMANY SS / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Nov 2028 3,405 307.22 Y PARACHUTE, 120MM PARACHUTE, 120MM 120MM ILLUM BODY 120MM ILLUM BODY 120MM ILLUM BODY FUZE MTSQ, M776 FUZE MTSQ, M776 FUZE MTSQ, M776 Location of PCO Item Number / Title [DODIC]: E25503 / CTG, 120mm Mortar VL ILLM, M930 Series w/MTSQ Fuze [C625] (Each) RFP Issue Date Remarks: Multiple new base contracts: pricing incorporates added risk due to economic environment resulting in increased labor and material costs. LI 6780E25500 - 120MM Mortar, All Types Army UNCLASSIFIED Page 10 of 38 P-1 Line #13 Volume 1 - 359 === page 392 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E25507 / CTG, 120mm Mortar FRTR, M931 Series w/Pract Fuze [CA09] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) 831.810 Less PY Advance Procurement ($ in Millions) - - 52.411 43.277 - Net Procurement (P-1) ($ in Millions) 831.810 Plus CY Advance Procurement ($ in Millions) - - 52.411 43.277 - Total Obligation Authority ($ in Millions) 831.810 - - 52.411 43.277 FY 2027 Base FY 2027 OOC - - 106.641 FY 2027 Total - - - 106.641 - 106.641 - - - 106.641 - 106.641 - - 106.641 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost Qty ($) (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) Total Cost Qty ($) (Each) ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, (†) PACK (LAP) FIN ASSEMBLY, M31 (†) IGNITION CARTRIDGE, (†) M1020 PROPELLANT (†) CHARGE, M234A1 SHELL BODY, 120MM (†) FRPC FUZE PRACTICE, M781 (†) Subtotal: Recurring Cost 85.82 871,910 74.829 230.84 60,408 13.945 235.68 41,968 9.891 248.20 138,530 34.383 - - - 248.20 138,530 34.383 42.22 898,067 37.917 43.35 62,220 2.697 44.31 43,227 1.915 45.22 142,685 6.452 - - - 45.22 142,685 6.452 24.73 898,067 22.205 35.57 62,220 2.213 34.23 43,227 1.480 39.17 142,685 5.589 - - - 39.17 142,685 5.589 32.15 2,400,613 77.183 37.17 248,881 9.251 46.88 172,908 8.106 47.85 570,743 27.310 - - - 47.85 570,743 27.310 179.71 600,153 107.851 261.42 62,220 16.266 349.36 43,227 15.102 148.13 142,685 21.136 - - - 148.13 142,685 21.136 33.00 600,153 19.808 30.25 62,220 1.882 30.77 43,227 1.330 33.69 142,685 4.807 - - - 33.69 142,685 4.807 - - 339.791 - - 46.254 - - 37.824 - - 99.677 - - - - - 99.677 - - 339.791 - - 46.254 - - 37.824 - - 99.677 - - - - - 99.677 Acceptance Test - - 3.612 - - 0.613 - - 0.330 - - 0.980 - - - - - 0.980 First Article Test - - 0.946 - - 1.467 - - 1.000 - - 1.040 - - - - - 1.040 Subtotal: Support Acceptance Testing Cost - - 4.558 - - 2.080 - - 1.330 - - 2.020 - - - - - 2.020 Subtotal: Hardware Cost Support - Acceptance Testing Cost LI 6780E25500 - 120MM Mortar, All Types Army UNCLASSIFIED Page 11 of 38 P-1 Line #13 Volume 1 - 360 === page 393 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E25507 / CTG, 120mm Mortar FRTR, M931 Series w/Pract Fuze [CA09] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Support - Non-Recurring Support Cost Industrial Stock - - 1.420 - - - - - - - - - - - - - - - Subtotal: Support - NonRecurring Support Cost - - 1.420 - - - - - - - - - - - - - - - Support - Production Engineering Cost Production Engineering - - 486.039 - - 4.077 - - 4.122 - - 4.941 - - - - - 4.941 Subtotal: Support Production Engineering Cost - - 486.039 - - 4.077 - - 4.122 - - 4.941 - - - - - 4.941 Gross/Weapon System Cost - - 831.810 - - 52.411 - - 43.277 - - 106.641 - - - - - 106.641 Remarks: Multiple new base contracts: pricing incorporates added risk due to economic environment resulting in increased labor and material costs. (†) indicates the presence of a P-5a LI 6780E25500 - 120MM Mortar, All Types Army UNCLASSIFIED Page 12 of 38 P-1 Line #13 Volume 1 - 361 === page 394 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 O O C Cost Elements LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) FIN ASSEMBLY, M31 FIN ASSEMBLY, M31 FIN ASSEMBLY, M31 IGNITION CARTRIDGE, M1020 IGNITION CARTRIDGE, M1020 IGNITION CARTRIDGE, M1020 PROPELLANT CHARGE, M234A1 PROPELLANT CHARGE, M234A1 PROPELLANT CHARGE, M234A1 SHELL BODY, 120MM FRPC SHELL BODY, 120MM FRPC SHELL BODY, 120MM FRPC FUZE PRACTICE, M781 FUZE PRACTICE, M781 FUZE PRACTICE, M781 (†) P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E25507 / CTG, 120mm Mortar FRTR, M931 Series w/Pract Fuze [CA09] Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 GEN DYNAMICS ORD & TAC SYS CANADA / LE GARDEUR, CANADA C / IDIQ PICATINNY ARSENAL, NJ Sep 2025 Sep 2027 60,408 230.84 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ May 2026 May 2028 41,968 235.68 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Sep 2027 Sep 2029 138,530 248.20 Y 2025 MACHINING TECHNOLOGIES INC / SALISBURY, MD SS / IDIQ ROCK ISLAND ARSENAL, IL Dec 2024 Jun 2026 62,220 43.35 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 43,227 44.31 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 142,685 45.22 Y 2025 NAMMO POCAL INC. / SCRANTON, PA SS / IDIQ ROCK ISLAND ARSENAL, IL Apr 2025 Oct 2026 62,220 35.57 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 43,227 34.23 Y 2027 NAMMO POCAL INC. / SCRANTON, PA SS / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 142,685 39.17 Y 2025 GENERAL DYNAMICS ORD & TAC SYS / MARION, IL C / IDIQ ROCK ISLAND ARSENAL, IL Jun 2025 Dec 2026 248,881 37.17 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 172,908 46.88 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 570,743 47.85 Y 2025 GENERAL DYNAMICS ORD & TAC SYS / WILKES BARRE, PA C / IDIQ PICATINNY ARSENAL, NJ Mar 2025 Sep 2026 62,220 261.42 N 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 43,227 349.36 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 142,685 148.13 Y 2025 NAMMO POCAL INC. / SCRANTON, PA SS / IDIQ PICATINNY ARSENAL, NJ Mar 2025 Sep 2026 62,220 30.25 Y 2026 TO BE SELECTED / TO BE SELECTED Option / FFP PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 43,227 30.77 Y 2027 NAMMO POCAL INC. / SCRANTON, PA SS / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 142,685 33.69 Y (Each) RFP Issue Date indicates the presence of a P-21 LI 6780E25500 - 120MM Mortar, All Types Army UNCLASSIFIED Page 13 of 38 P-1 Line #13 Volume 1 - 362 === page 395 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Item Number / Title [DODIC]: E25507 / CTG, 120mm Mortar FRTR, M931 Series w/Pract Fuze [CA09] Remarks: Multiple new base contracts; pricing incorporates added risk due to economic environment resulting in increased labor and material costs. Pricing may decrease from anticipated competition. LI 6780E25500 - 120MM Mortar, All Types Army UNCLASSIFIED Page 14 of 38 P-1 Line #13 Volume 1 - 363 === page 396 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E25507 / CTG, 120mm Mortar FRTR, M931 Series w/Pract Fuze [CA09] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 871910 1 2025 ARMY 60.408 .000 60.408 2 2026 ARMY 41.968 .000 41.968 2 2027 ARMY 138.530 .000 138.530 A - - - - - - - - - - - - - A - - - - - 60.408 41.968 138.530 O C T LI 6780E25500 - 120MM Mortar, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 38 S E P O C T N O V D E C J A N F E B P-1 Line #13 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 364 === page 397 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E25507 / CTG, 120mm Mortar FRTR, M931 Series w/Pract Fuze [CA09] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 871910 1 2025 ARMY 60.408 .000 60.408 - - - - - - - - - - - 2 2026 ARMY 41.968 .000 41.968 - - - - - - - - - - - 2 2027 ARMY 138.530 .000 138.530 O C T LI 6780E25500 - 120MM Mortar, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 38 22.280 24.000 14.128 .000 - - - - - - - - A - - - - - - - - S E P O C T N O V D E C J A N F E B P-1 Line #13 M A R A P R 24.000 17.968 M A Y .000 J U N J U L A U G - 138.530 S E P Volume 1 - 365 === page 398 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E25507 / CTG, 120mm Mortar FRTR, M931 Series w/Pract Fuze [CA09] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 871910 1 2025 ARMY 60.408 60.408 .000 2 2026 ARMY 41.968 41.968 .000 2 2027 ARMY 138.530 .000 .000 .000 138.530 O C T LI 6780E25500 - 120MM Mortar, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 38 24.000 24.000 24.000 24.000 24.000 18.530 S E P O C T N O V D E C J A N F E B P-1 Line #13 .000 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 366 === page 399 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E25507 / CTG, 120mm Mortar FRTR, M931 Series w/Pract Fuze [CA09] Procurement Leadtime (Months) Initial ALT After Oct 1 Reorder MSR For 2027 1-8-5 For 2027 MAX For 2027 ALT Prior to Oct 1 1 GEN DYNAMICS ORD & TAC SYS - CANADA - LE GARDEUR, CANADA 12,000 24,000 50,000 12 12 24 36 9 9 24 33 2 TO BE SELECTED - TO BE SELECTED 12,000 24,000 50,000 12 12 24 36 9 9 24 33 Manufacturer Name - Location Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 6780E25500 - 120MM Mortar, All Types Army UNCLASSIFIED Page 18 of 38 P-1 Line #13 Volume 1 - 367 === page 400 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E91300 / CTG, 120mm Mortar WP Smoke, M929 Series w/MOFM [CA03] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 18.948 19.367 20.357 - 20.357 - Gross/Weapon System Cost ($ in Millions) 365.231 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 365.231 Plus CY Advance Procurement ($ in Millions) - - - - - 18.948 19.367 20.357 - 20.357 - Total Obligation Authority ($ in Millions) 365.231 FY 2027 Total - - - - - 18.948 19.367 20.357 - 20.357 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements Qty FY 2025 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2026 Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) Total Cost ($) (Each) ($ M) 390.52 113,483 44.318 463.24 8,663 4.013 516.59 9,048 4.674 677.72 7,513 5.092 - - - 677.72 7,513 5.092 41.41 116,887 4.840 43.35 8,923 0.387 44.31 9,319 0.413 45.22 7,738 0.350 - - - 45.22 7,738 0.350 25.96 116,887 3.035 35.57 8,923 0.317 34.23 9,319 0.319 39.16 7,738 0.303 - - - 39.16 7,738 0.303 25.64 467,550 11.990 37.17 35,692 1.327 46.87 37,278 1.747 47.85 30,953 1.481 - - - 47.85 30,953 1.481 277.54 116,887 32.440 429.81 8,923 3.835 386.53 9,319 3.602 447.17 7,738 3.460 - - - 447.17 7,738 3.460 84.21 116,887 9.843 251.45 8,923 2.244 251.45 9,319 2.343 256.66 7,738 1.986 - - - 256.66 7,738 1.986 256.93 116,887 30.032 244.27 8,923 2.180 124.81 9,319 1.163 341.75 7,738 2.644 - - - 341.75 7,738 2.644 60.46 116,887 7.067 105.01 8,923 0.937 115.01 9,319 1.072 117.39 7,738 0.908 - - - 117.39 7,738 0.908 16.00 116,887 1.870 37.81 8,923 0.337 35.89 9,319 0.334 36.63 7,738 0.283 - - - 36.63 7,738 0.283 Hardware Cost Recurring Cost LOAD, ASSEMBLE, (†) PACK (LAP) FIN ASSEMBLY, M31 (†) IGNITION CARTRIDGE, (†) M1020 PROPELLANT (†) CHARGE, M234A1 SHELL BODY, 120MM (†) SMK BURSTER HOUSING, (†) 120MM SMOKE FUZE MOFM, M734A1 (†) BURSTER ASSEMBLY, M86 (†) FIBER CONTAINER PA 167, 120MM (†) LI 6780E25500 - 120MM Mortar, All Types Army UNCLASSIFIED Page 19 of 38 P-1 Line #13 Volume 1 - 368 === page 401 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E91300 / CTG, 120mm Mortar WP Smoke, M929 Series w/MOFM [CA03] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost METAL CONTAINER ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 72.21 59,012 4.261 136.38 4,505 0.614 140.60 4,795 0.674 143.52 3,906 0.561 - - - 143.52 3,906 0.561 - - 149.697 - - 16.191 - - 16.342 - - 17.069 - - - - - 17.069 - - 149.697 - - 16.191 - - 16.342 - - 17.069 - - - - - 17.069 Acceptance Test - - 0.946 - - 0.385 - - 0.149 - - 0.141 - - - - - 0.141 First Article Test - - 0.372 - - 0.189 - - 0.800 - - 0.812 - - - - - 0.812 Subtotal: Support Acceptance Testing Cost - - 1.318 - - 0.574 - - 0.949 - - 0.953 - - - - - 0.953 - - 0.126 - - - - - - - - - - - - - - - - - 0.126 - - - - - - - - - - - - - - - PA 154, 120MM (†) Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Non-Recurring Support Cost Facilitization Subtotal: Support - NonRecurring Support Cost Support - Production Engineering Cost Production Engineering - - 214.091 - - 2.182 - - 2.077 - - 2.334 - - - - - 2.334 Subtotal: Support Production Engineering Cost - - 214.091 - - 2.182 - - 2.077 - - 2.334 - - - - - 2.334 Gross/Weapon System Cost - - 365.231 - - 18.948 - - 19.367 - - 20.357 - - - - - 20.357 Remarks: Multiple new base contracts: pricing incorporates added risk due to economic environment resulting in increased labor and material costs. (†) indicates the presence of a P-5a LI 6780E25500 - 120MM Mortar, All Types Army UNCLASSIFIED Page 20 of 38 P-1 Line #13 Volume 1 - 369 === page 402 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 O O C Cost Elements P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 PINE BLUFF ARSENAL / PINE BLUFF, AR PO PICATINNY ARSENAL, NJ Mar 2025 Mar 2028 8,663 463.24 Y 2026 PINE BLUFF ARSENAL / PINE BLUFF, AR PO PICATINNY ARSENAL, NJ Feb 2026 Feb 2029 9,048 516.59 Y 2027 PINE BLUFF ARSENAL / PINE BLUFF, AR PO PICATINNY ARSENAL, NJ Feb 2027 Feb 2030 7,513 677.72 Y 2025 MACHINING TECHNOLOGIES INC / SALISBURY, MD SS / IDIQ ROCK ISLAND ARSENAL, IL Dec 2024 Jun 2026 8,923 43.35 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Aug 2027 9,319 44.31 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 7,738 45.22 Y 2025 NAMMO POCAL INC. / SCRANTON, PA SS / IDIQ ROCK ISLAND ARSENAL, IL Apr 2025 Oct 2026 8,923 35.57 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Aug 2027 9,319 34.23 Y 2027 NAMMO POCAL INC. / SCRANTON, PA SS / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 7,738 39.16 Y 2025 GENERAL DYNAMICS ORD & TAC SYS / MARION, IL C / IDIQ ROCK ISLAND ARSENAL, IL Jun 2025 Dec 2026 35,692 37.17 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Aug 2027 37,278 46.87 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Feb 2027 Aug 2028 30,953 47.85 Y 2025 PREMIER PRECISION MACHINING LLC / FALCONER, NY C / IDIQ PICATINNY ARSENAL, NJ Sep 2025 Mar 2027 8,923 429.81 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Aug 2027 9,319 386.53 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Feb 2027 Aug 2028 7,738 447.17 Y BURSTER HOUSING, 120MM SMOKE 2025 CRANE ARMY AMMO ACTIVITY / CRANE, IN PO PICATINNY ARSENAL, NJ Aug 2025 Feb 2027 8,923 251.45 Y BURSTER HOUSING, 120MM SMOKE 2026 CRANE ARMY AMMO ACTIVITY / CRANE, IN PO PICATINNY ARSENAL, NJ Feb 2026 Aug 2027 9,319 251.45 Y BURSTER HOUSING, 120MM SMOKE 2027 CRANE ARMY AMMO ACTIVITY / CRANE, IN PO PICATINNY ARSENAL, NJ Feb 2027 Aug 2028 7,738 256.66 Y 2025 L-3 FUZING & ORDANCE SYSTEMS INC / CINCINNATI, OH C / IDIQ PICATINNY ARSENAL, NJ Jul 2025 Jan 2027 8,923 244.27 Y LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) FIN ASSEMBLY, M31 FIN ASSEMBLY, M31 FIN ASSEMBLY, M31 IGNITION CARTRIDGE, M1020 IGNITION CARTRIDGE, M1020 IGNITION CARTRIDGE, M1020 PROPELLANT CHARGE, M234A1 PROPELLANT CHARGE, M234A1 PROPELLANT CHARGE, M234A1 SHELL BODY, 120MM SMK SHELL BODY, 120MM SMK SHELL BODY, 120MM SMK FUZE MOFM, M734A1 LI 6780E25500 - 120MM Mortar, All Types Army Location of PCO Item Number / Title [DODIC]: E91300 / CTG, 120mm Mortar WP Smoke, M929 Series w/MOFM [CA03] UNCLASSIFIED Page 21 of 38 P-1 Line #13 (Each) RFP Issue Date Volume 1 - 370 === page 403 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) Contractor and Location 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Aug 2028 9,319 124.81 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 7,738 341.75 Y 2025 CRANE ARMY AMMO ACTIVITY / CRANE, IN PO PICATINNY ARSENAL, NJ Aug 2025 Feb 2027 8,923 105.01 Y 2026 CRANE ARMY AMMO ACTIVITY / CRANE, IN PO PICATINNY ARSENAL, NJ Feb 2026 Aug 2027 9,319 115.01 Y 2027 CRANE ARMY AMMO ACTIVITY / CRANE, IN PO PICATINNY ARSENAL, NJ Feb 2027 Aug 2028 7,738 117.39 Y FIBER CONTAINER PA 167, 120MM 2025 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 8,923 37.81 Y FIBER CONTAINER PA 167, 120MM 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Aug 2027 9,319 35.89 Y FIBER CONTAINER PA 167, 120MM 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 7,738 36.63 Y METAL CONTAINER PA 154, 120MM 2025 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 4,505 136.38 Y METAL CONTAINER PA 154, 120MM 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Aug 2027 4,795 140.60 Y METAL CONTAINER PA 154, 120MM 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 3,906 143.52 Y FUZE MOFM, M734A1 BURSTER ASSEMBLY, M86 BURSTER ASSEMBLY, M86 BURSTER ASSEMBLY, M86 Location of PCO Item Number / Title [DODIC]: E91300 / CTG, 120mm Mortar WP Smoke, M929 Series w/MOFM [CA03] FY FUZE MOFM, M734A1 (†) O O C P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types (Each) RFP Issue Date indicates the presence of a P-21 Remarks: Multiple new base contracts: pricing incorporates added risk due to economic environment resulting in increased labor and material costs. BARDS pricing fluctuation based on GOGO workload. LI 6780E25500 - 120MM Mortar, All Types Army UNCLASSIFIED Page 22 of 38 P-1 Line #13 Volume 1 - 371 === page 404 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E91300 / CTG, 120mm Mortar WP Smoke, M929 Series w/MOFM [CA03] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 113483 1 2025 ARMY 8,663 0 8,663 1 2026 ARMY 9,048 0 9,048 1 2027 ARMY 7,513 0 7,513 A - - - - - - - - - - - - - - - - - - - 8,663 A - - - - - - - - 9,048 7,513 O C T LI 6780E25500 - 120MM Mortar, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 23 of 38 S E P O C T N O V D E C J A N F E B P-1 Line #13 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 372 === page 405 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E91300 / CTG, 120mm Mortar WP Smoke, M929 Series w/MOFM [CA03] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 113483 1 2025 ARMY 8,663 0 8,663 - - - - - - - - - - - - - - - - - 8,663 1 2026 ARMY 9,048 0 9,048 - - - - - - - - - - - - - - - - - - 1 2027 ARMY 7,513 0 7,513 A O C T LI 6780E25500 - 120MM Mortar, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 24 of 38 S E P O C T N O V D E C J A N F E B P-1 Line #13 0 - M A R - A P R - M A Y - J U N - J U L A U G - 9,048 - 7,513 S E P Volume 1 - 373 === page 406 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E91300 / CTG, 120mm Mortar WP Smoke, M929 Series w/MOFM [CA03] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 113483 1 2025 ARMY 8,663 8,663 0 1 2026 ARMY 9,048 0 9,048 - - - - 9,048 0 1 2027 ARMY 7,513 0 7,513 - - - - - O C T LI 6780E25500 - 120MM Mortar, All Types Army N O V D E C J A N F E B 0 M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 25 of 38 S E P O C T N O V D E C J A N 7,513 F E B P-1 Line #13 0 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 374 === page 407 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E91300 / CTG, 120mm Mortar WP Smoke, M929 Series w/MOFM [CA03] Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 PINE BLUFF ARSENAL PINE BLUFF, AR MSR For 2027 1-8-5 For 2027 MAX For 2027 6,000 8,704 13,600 ALT Prior to Oct 1 ALT After Oct 1 5 Reorder Manufacturing PLT 5 36 Total After Oct 1 ALT Prior to Oct 1 41 ALT After Oct 1 5 Manufacturing PLT 5 Total After Oct 1 36 41 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 6780E25500 - 120MM Mortar, All Types Army UNCLASSIFIED Page 26 of 38 P-1 Line #13 Volume 1 - 375 === page 408 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E91400 / CTG, 120mm Mortar HE, M934 Series w/MOFM [CA04] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 55.801 50.004 51.484 - 51.484 - Gross/Weapon System Cost ($ in Millions) 244.615 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 244.615 Plus CY Advance Procurement ($ in Millions) - - - - - 55.801 50.004 51.484 - 51.484 - Total Obligation Authority ($ in Millions) 244.615 FY 2027 Total - - - - - 55.801 50.004 51.484 - 51.484 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements FY 2025 Total Cost Qty ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty ($) (Each) (Each) ($ M) 147.82 140,152 20.717 320.54 40,377 12.942 381.66 34,916 13.326 409.04 33,208 13.583 - - - 409.04 33,208 13.583 129.89 144,603 18.782 292.34 41,589 12.158 307.19 35,963 11.047 155.55 34,204 5.320 - - - 155.55 34,204 5.320 25.63 144,603 3.706 35.57 41,589 1.479 34.23 35,963 1.231 39.17 34,204 1.340 - - - 39.17 34,204 1.340 14.70 655,113 9.627 15.10 363,393 5.487 13.79 314,244 4.333 14.05 298,872 4.199 - - - 14.05 298,872 4.199 21.05 634,542 13.356 37.17 166,353 6.183 46.88 143,853 6.744 47.85 136,816 6.547 - - - 47.85 136,816 6.547 39.32 144,603 5.685 43.35 41,589 1.803 44.31 35,963 1.594 45.22 34,204 1.547 - - - 45.22 34,204 1.547 91.87 8,339 0.766 92.72 4,442 0.412 100.10 4,539 0.454 93.36 4,317 0.403 - - - 93.36 4,317 0.403 (†) 252.48 158,634 40.052 244.27 41,589 10.159 124.81 35,963 4.489 341.75 34,204 11.689 - - - 341.75 34,204 11.689 Subtotal: Recurring Cost - - 112.691 - - 50.624 - - 43.218 - - 44.628 - - - - - 44.628 - - 112.691 - - 50.624 - - 43.218 - - 44.628 - - - - - 44.628 Hardware Cost Recurring Cost LOAD, ASSEMBLE, (†) PACK (LAP) SHELL BODY, 120MM (†) HE IGNITION CARTRIDGE, (†) M1020 COMP B TYPE I GRADE A (†) PROPELLANT (†) CHARGE, M234A1 FIN ASSEMBLY, M31 (†) PBXW-12 BULK EXPLOSIVE (†) FUZE MOFM, M734A1 Subtotal: Hardware Cost Support - Acceptance Testing Cost LI 6780E25500 - 120MM Mortar, All Types Army UNCLASSIFIED Page 27 of 38 P-1 Line #13 Volume 1 - 376 === page 409 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E91400 / CTG, 120mm Mortar HE, M934 Series w/MOFM [CA04] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Acceptance Test - - 0.370 - - 0.417 - - 0.323 - - 0.324 - - - - - 0.324 First Article Test - - 10.050 - - 0.143 - - 1.000 - - 1.040 - - - - - 1.040 Subtotal: Support Acceptance Testing Cost - - 10.420 - - 0.560 - - 1.323 - - 1.364 - - - - - 1.364 Value Engineering - - 0.393 - - - - - - - - - - - - - - - Industrial Stock - - - - - 1.479 - - - - - - - - - - - - Subtotal: Support - NonRecurring Support Cost - - 0.393 - - 1.479 - - - - - - - - - - - - Production Engineering - - 121.106 - - 2.890 - - 5.463 - - 5.492 - - - - - 5.492 Subtotal: Support Production Engineering Cost - - 121.106 - - 2.890 - - 5.463 - - 5.492 - - - - - 5.492 Support - Non-Recurring Support Cost Support - Production Engineering Cost Support - Staging and Transportation Cost Staging and Transportation - - - - - 0.248 - - - - - - - - - - - - Subtotal: Support - Staging and Transportation Cost - - - - - 0.248 - - - - - - - - - - - - Gross/Weapon System Cost - - - - 55.801 - - 50.004 - - 51.484 - - - - - 51.484 244.615 Remarks: Multiple new base contracts: pricing incorporates added risk due to economic environment resulting in increased labor and material costs. (†) indicates the presence of a P-5a LI 6780E25500 - 120MM Mortar, All Types Army UNCLASSIFIED Page 28 of 38 P-1 Line #13 Volume 1 - 377 === page 410 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 O O C Cost Elements LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) SHELL BODY, 120MM HE SHELL BODY, 120MM HE SHELL BODY, 120MM HE IGNITION CARTRIDGE, M1020 IGNITION CARTRIDGE, M1020 IGNITION CARTRIDGE, M1020 COMP B TYPE I GRADE A COMP B TYPE I GRADE A COMP B TYPE I GRADE A PROPELLANT CHARGE, M234A1 PROPELLANT CHARGE, M234A1 PROPELLANT CHARGE, M234A1 FIN ASSEMBLY, M31 FIN ASSEMBLY, M31 FIN ASSEMBLY, M31 PBXW-12 BULK EXPLOSIVE P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 GEN DYNAMICS ORD & TAC SYS CANADA / LE GARDEUR, CANADA C / IDIQ ROCK ISLAND ARSENAL, IL Sep 2025 Oct 2029 40,377 320.54 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ May 2026 Apr 2030 34,916 381.66 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Jun 2027 Jun 2030 33,208 409.04 Y 2025 GENERAL DYNAMICS ORD & TAC SYS / WILKES BARRE, PA C / IDIQ PICATINNY ARSENAL, NJ Sep 2025 May 2029 41,589 292.34 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Jul 2028 35,963 307.19 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Jun 2027 Dec 2028 34,204 155.55 Y 2025 NAMMO POCAL INC. / SCRANTON, PA SS / IDIQ ROCK ISLAND ARSENAL, IL Apr 2025 Oct 2026 41,589 35.57 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 35,963 34.23 Y 2027 NAMMO POCAL INC. / SCRANTON, PA SS / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 34,204 39.17 Y 2025 BAE SYSTEMS ORDNANCE SYSTEMS INC / KINGSPORT, TN Option / IDIQ ROCK ISLAND ARSENAL, IL Aug 2025 Aug 2026 363,393 15.10 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 314,244 13.79 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Jul 2027 Jul 2028 298,872 14.05 Y 2025 GENERAL DYNAMICS ORD & TAC SYS / MARION, IL C / IDIQ ROCK ISLAND ARSENAL, IL Apr 2025 Oct 2026 166,353 37.17 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 143,853 46.88 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 136,816 47.85 Y 2025 MACHINING TECHNOLOGIES INC / SALISBURY, MD SS / IDIQ ROCK ISLAND ARSENAL, IL Feb 2025 Aug 2025 41,589 43.35 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 35,963 44.31 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 34,204 45.22 Y 2025 BAE SYSTEMS ORDNANCE SYSTEMS INC / KINGSPORT, TN Option / IDIQ ROCK ISLAND ARSENAL, IL Aug 2025 Aug 2026 4,442 92.72 Y LI 6780E25500 - 120MM Mortar, All Types Army Location of PCO Item Number / Title [DODIC]: E91400 / CTG, 120mm Mortar HE, M934 Series w/MOFM [CA04] UNCLASSIFIED Page 29 of 38 P-1 Line #13 (Each) RFP Issue Date Volume 1 - 378 === page 411 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements PBXW-12 BULK EXPLOSIVE PBXW-12 BULK EXPLOSIVE FUZE MOFM, M734A1 FUZE MOFM, M734A1 FUZE MOFM, M734A1 (†) O O C P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E91400 / CTG, 120mm Mortar HE, M934 Series w/MOFM [CA04] Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 4,539 100.10 Y 2027 BAE SYSTEMS ORDNANCE SYSTEMS INC / KINGSPORT, TN Option / IDIQ ROCK ISLAND ARSENAL, IL Jul 2027 Jul 2028 4,317 93.36 Y 2025 L-3 FUZING & ORDANCE SYSTEMS INC / CINCINNATI, OH C / IDIQ PICATINNY ARSENAL, NJ Jul 2025 Jan 2027 41,589 244.27 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 35,963 124.81 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Jun 2027 Dec 2028 34,204 341.75 Y (Each) RFP Issue Date indicates the presence of a P-21 Remarks: Multiple new base contracts; pricing incorporates added risk due to economic environment resulting in increased labor and material costs. LI 6780E25500 - 120MM Mortar, All Types Army UNCLASSIFIED Page 30 of 38 P-1 Line #13 Volume 1 - 379 === page 412 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E91400 / CTG, 120mm Mortar HE, M934 Series w/MOFM [CA04] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 140152 1 2025 ARMY 40.377 .000 40.377 2 2026 ARMY 34.916 .000 34.916 2 2027 ARMY 33.208 .000 33.208 A - - - - - - - - - - - - - 40.377 A - - - - - 34.916 33.208 O C T LI 6780E25500 - 120MM Mortar, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 31 of 38 S E P O C T N O V D E C J A N F E B P-1 Line #13 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 380 === page 413 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E91400 / CTG, 120mm Mortar HE, M934 Series w/MOFM [CA04] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 140152 1 2025 ARMY 40.377 .000 40.377 - - - - - - - - - - - - - - - - - - - - - - - - 40.377 2 2026 ARMY 34.916 .000 34.916 - - - - - - - - - - - - - - - - - - - - - - - - 34.916 2 2027 ARMY 33.208 .000 33.208 A - - - - - - - - - - - - - - - - 33.208 O C T LI 6780E25500 - 120MM Mortar, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 32 of 38 S E P O C T N O V D E C J A N F E B P-1 Line #13 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 381 === page 414 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E91400 / CTG, 120mm Mortar HE, M934 Series w/MOFM [CA04] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 140152 1 2025 ARMY 40.377 .000 40.377 - - - - - - - - - - - - 2 2026 ARMY 34.916 .000 34.916 - - - - - - - - - - - - - - - - - - 2 2027 ARMY 33.208 .000 33.208 - - - - - - - - - - - - - - - - - - O C T LI 6780E25500 - 120MM Mortar, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 33 of 38 S E P 20.000 20.377 O C T N O V .000 D E C J A N F E B P-1 Line #13 M A R 20.000 14.916 A P R M A Y .000 20.000 13.208 J U N J U L .000 A U G S E P Volume 1 - 382 === page 415 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E91400 / CTG, 120mm Mortar HE, M934 Series w/MOFM [CA04] Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 GEN DYNAMICS ORD & TAC SYS - CANADA - LE GARDEUR, CANADA 14,000 20,000 30,000 9 9 40 49 8 8 40 48 2 TO BE SELECTED - TO BE SELECTED 14,000 20,000 30,000 12 12 36 48 9 9 36 45 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 6780E25500 - 120MM Mortar, All Types Army UNCLASSIFIED Page 34 of 38 P-1 Line #13 Volume 1 - 383 === page 416 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E91500 / CTG, 120mm Mortar IR ILLUM, M983 Series w/MTSQ [CA07] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 0.963 3.269 4.822 - 4.822 - Gross/Weapon System Cost ($ in Millions) 245.082 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 245.082 Plus CY Advance Procurement ($ in Millions) - - - - - 0.963 3.269 4.822 - 4.822 - Total Obligation Authority ($ in Millions) 245.082 FY 2027 Total - - - - - 0.963 3.269 4.822 - 4.822 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) Total Cost ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, (†) PACK (LAP) FUZE MTSQ, M776 (†) 120MM ILLUM BODY (†) PROPELLANT (†) CHARGE, M234A1 METAL CONTAINER PA 154, 120MM (†) IR ILLUM CANNISTER, 120MM (†) IGNITION CARTRIDGE, (†) M1020 PARACHUTE, 120MM (†) FIBER CONTAINER PA 167, 120MM (†) 87.77 211,112 18.529 - - - 485.20 1,244 0.604 520.90 1,633 0.851 - - - 520.90 1,633 0.851 226.73 89,904 20.384 - - - 300.90 1,281 0.385 307.22 1,681 0.516 - - - 307.22 1,681 0.516 286.54 217,446 62.307 - - - 183.69 1,281 0.235 362.29 1,681 0.609 - - - 362.29 1,681 0.609 21.73 869,780 18.899 - - - 46.87 5,125 0.240 47.85 6,727 0.322 - - - 47.85 6,727 0.322 64.54 77,855 5.025 - - - 140.60 646 0.091 143.52 849 0.122 - - - 143.52 849 0.122 362.16 89,904 32.559 - - - 759.00 1,281 0.972 774.73 1,681 1.302 - - - 774.73 1,681 1.302 26.32 217,446 5.722 - - - 34.23 1,281 0.044 39.16 1,681 0.066 - - - 39.16 1,681 0.066 56.62 217,446 12.311 - - - 87.63 1,281 0.112 89.45 1,681 0.150 - - - 89.45 1,681 0.150 14.35 217,446 3.120 - - - 35.88 1,281 0.046 36.63 1,681 0.062 - - - 36.63 1,681 0.062 LI 6780E25500 - 120MM Mortar, All Types Army UNCLASSIFIED Page 35 of 38 P-1 Line #13 Volume 1 - 384 === page 417 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E91500 / CTG, 120mm Mortar IR ILLUM, M983 Series w/MTSQ [CA07] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost FIN ASSEMBLY, M31 (†) ($) 40.29 Subtotal: Recurring Cost FY 2025 Total Cost Qty (Each) ($ M) 217,446 Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) 8.760 - - - 44.31 1,281 0.057 45.22 1,681 0.076 - - - 45.22 1,681 0.076 - - 187.617 - - - - - 2.786 - - 4.076 - - - - - 4.076 - - 187.617 - - - - - 2.786 - - 4.076 - - - - - 4.076 Acceptance Test - - 45.145 - - - - - 0.090 - - 0.190 - - - - - 0.190 Subtotal: Support Acceptance Testing Cost - - 45.145 - - - - - 0.090 - - 0.190 - - - - - 0.190 Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Production Engineering Cost Production Engineering - - 12.321 - - 0.963 - - 0.392 - - 0.556 - - - - - 0.556 Subtotal: Support Production Engineering Cost - - 12.321 - - 0.963 - - 0.392 - - 0.556 - - - - - 0.556 Gross/Weapon System Cost - - 245.082 - - 0.963 - - 3.269 - - 4.822 - - - - - 4.822 (†) indicates the presence of a P-5a LI 6780E25500 - 120MM Mortar, All Types Army UNCLASSIFIED Page 36 of 38 P-1 Line #13 Volume 1 - 385 === page 418 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements O O C P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 PINE BLUFF ARSENAL / PINE BLUFF, AR PO PICATINNY ARSENAL, NJ Feb 2026 Feb 2029 1,244 485.20 Y 2027 PINE BLUFF ARSENAL / PINE BLUFF, AR PO PICATINNY ARSENAL, NJ Feb 2027 Feb 2030 1,633 520.90 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Aug 2027 1,281 300.90 Y 2027 JUNGHANS MICROTEC GMBH / DUNNINGEN, GERMANY SS / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Nov 2028 1,681 307.22 Y 2026 GENERAL DYNAMICS ORD & TAC / WILKES BARRE, PA Option / IDIQ PICATINNY ARSENAL, NJ Feb 2026 Aug 2027 1,281 183.69 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 1,681 362.29 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 5,125 46.87 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 6,727 47.85 Y METAL CONTAINER PA 154, 120MM 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Aug 2027 646 140.60 Y METAL CONTAINER PA 154, 120MM 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 849 143.52 Y 2026 CRANE ARMY AMMO ACTIVITY / CRANE, IN PO PICATINNY ARSENAL, NJ Feb 2026 Oct 2028 1,281 759.00 Y 2027 CRANE ARMY AMMO ACTIVITY / CRANE, IN PO PICATINNY ARSENAL, NJ Feb 2027 Oct 2028 1,681 774.73 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 1,281 34.23 Y 2027 NAMMO POCAL INC. / SCRANTON, PA SS / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 1,681 39.16 Y 2026 YOLAND CORPORATION / BROOKLYN, NY SS / IDIQ ROCK ISLAND ARSENAL, IL Feb 2026 Aug 2027 1,281 87.63 Y 2027 YOLAND CORPORATION / BROOKLYN, NY SS / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 1,681 89.45 Y FIBER CONTAINER PA 167, 120MM 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Feb 2026 Aug 2027 1,281 35.88 Y FIBER CONTAINER PA 167, 120MM 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 1,681 36.63 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Feb 2026 Aug 2027 1,281 44.31 Y LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) FUZE MTSQ, M776 FUZE MTSQ, M776 120MM ILLUM BODY 120MM ILLUM BODY PROPELLANT CHARGE, M234A1 PROPELLANT CHARGE, M234A1 IR ILLUM CANNISTER, 120MM IR ILLUM CANNISTER, 120MM IGNITION CARTRIDGE, M1020 IGNITION CARTRIDGE, M1020 PARACHUTE, 120MM PARACHUTE, 120MM FIN ASSEMBLY, M31 LI 6780E25500 - 120MM Mortar, All Types Army Location of PCO Item Number / Title [DODIC]: E91500 / CTG, 120mm Mortar IR ILLUM, M983 Series w/MTSQ [CA07] UNCLASSIFIED Page 37 of 38 P-1 Line #13 (Each) RFP Issue Date Volume 1 - 386 === page 419 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 33 Cost Elements FIN ASSEMBLY, M31 O O C FY Contractor and Location 2027 TO BE SELECTED / TO BE SELECTED P-1 Line Item Number / Title: 6780E25500 / 120MM Mortar, All Types Method/Type or Funding Vehicle C / IDIQ Location of PCO ROCK ISLAND ARSENAL, IL Item Number / Title [DODIC]: E91500 / CTG, 120mm Mortar IR ILLUM, M983 Series w/MTSQ [CA07] Award Date Date of First Delivery Mar 2027 Sep 2028 Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) 1,681 45.22 RFP Issue Date Y Remarks: Multiple new base contracts: pricing incorporates added risk due to economic environment resulting in increased labor and material costs. BARDS pricing fluctuation s based on GOGO workload. LI 6780E25500 - 120MM Mortar, All Types Army UNCLASSIFIED Page 38 of 38 P-1 Line #13 Volume 1 - 387 === page 420 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 35: Tank Ammunition P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 4,877.386 4,877.386 4,877.386 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 344.832 380.265 344.832 380.265 344.832 380.265 421.735 - - 421.735 - - 421.735 - 421.735 421.735 421.735 435.431 435.431 435.431 494.144 494.144 494.144 481.331 481.331 481.331 To FY 2031 Complete 486.455 486.455 486.455 - Total 7,921.579 7,921.579 7,921.579 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line includes CARTRIDGE, TANK, 105MM and 120MM ALL TYPES: (E73201) Cartridge, 120mm, Target Practice Multi-Purpose-Tracer (TPMP-T) M1002 is a target practice cartridge that simulates the size, weight, ballistics and the loader's function of setting the nose switch of the High Explosive Multi-Purpose cartridge M830A1. This round is fired from the M256 120mm smoothbore cannon on the M1A1/M1A2 Abrams Tank. The projectile is inert and composed of an aluminum body, steel nose with dummy plastic switch, aluminum tail cone, aluminum sabot, nylon obturators and tracer. The tail cone imparts spin to the projectile in flight for stabilization and provides the mechanism to limit the projectile's maximum range. The M1002 replaces the M831A1 cartridge. Tank crews will conduct live fire training with the cartridge to achieve and maintain gunnery proficiency. This item is Code A, approved for service use. (E73400) 120mm M865A1 (Longer Length) Target Practice Cone-Stabilized Discarding Sabot with Tracer (TPCSDS-T) is the follow on to the M865 TPCSDS-T. The M865A1 is a target practice round that simulates the ballistics of the 120mm M829 Series Armor Piercing Fin-Stabilized Discarding Sabot with Tracer (APFSDS-T) round and is a more accurate representation of the M829A4, in terms of size and handling, than its predecessor. This round is fired from the M256 120mm smoothbore cannon on the M1A1/M1A2 Abrams Tank. The projectile is inert and is composed of a steel core, aluminum fin, aluminum sabots, nylon obturator and tracer. The fin imparts spin to the projectile in flight for stabilization and provides the mechanism to limit the projectile's maximum range. Tank crews will conduct live fire training with the cartridge to achieve and maintain gunnery proficiency. This item is Code A, approved for service use. (E88105) 120mm HEMP-T, M1147 The Advanced Multi-Purpose (AMP) program is a direct fire line of sight 120mm large caliber munition in Full Rate Production for the Abrams Main Battle Tank. It has three modes of operation including point detonate, point detonate delay and airburst. AMP is the material solution for breaching double reinforced concrete walls and defeating Anti-Tank Guided Missile (ATGM) teams from 50m to 2000m (T) and 50m to 4500m (O), a validated gap that cannot be met with legacy stockpiled ammunition. In addition to added capability, AMP also successfully consolidates the capabilities of four legacy stockpiled 120mm high explosive and anti-personnel munitions, thereby addressing the users' battle carry dilemma by allowing them to load a single munition that is capable of defeating multiple targets including ATGM teams, reinforced walls, personnel, light armor, bunkers, and obstacles. This item is Code A, approved for service use. (E88106) 120mm M829A4 Armor Piercing Fin Stabilized, Discarding Sabot with Tracer (APFSDS-T) cartridge is the follow on to the M829A3 APFSDS-T cartridge. The M829A4 is the most effective anti-armor kinetic energy cartridge fired from the M256 120mm smoothbore cannon on the M1A1/M1A2 Abrams Tank. This cartridge has been designed to defeat advances in armor protection, specifically advancement in explosive reactive armor (ERA). The cartridge incorporates advancements in propulsion, using a temperature insensitive propellant, novel penetrator design, and an advanced composite sabot. The projectile system consists of a depleted uranium penetrator mated to a drag reducing windshield and flight stabilizing multi-bladed fin, all secured for launch with a composite sabot. The M829A4 captures several LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army UNCLASSIFIED Page 1 of 32 P-1 Line #14 Volume 1 - 388 === page 421 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 35: Tank Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A new technologies along with components previously used on previous APFSDS-T cartridges but incorporates technology advancements to yield significant improvement in performance over previous fielded cartridges. This item is Code A, approved for service use. LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army UNCLASSIFIED Page 2 of 32 P-1 Line #14 Volume 1 - 389 === page 422 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 35: Tank Ammunition P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD P-5 E73201 / CTG, 120mm Tank, M1002 TP MULTI PUR-TRACE (TPMPT) [CA31] P-5a, P-21 A P-5 E73400 / CTG, 120mm Tank TPCSDS-T, M865 [CA69] P-5a, P-21 A P-5 E88105 / CTG, 120MM TANK, HEMP-T, M1147 [CA71] P-5a, P-21 B P-5 E88106 / CTG, 120mm Tank APFSDS-T, M829A4 [CA64] P-5a, P-21 A P-40 Total Gross/Weapon System Cost MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 926.631 - / 55.433 - / 62.983 - / 65.107 - / - - / 65.107 / 3,160.021 - / 156.277 - / 127.179 - / 158.986 - / - - / 158.986 - / 300.282 - / 63.409 - / 80.416 - / 69.605 - / - - / 69.605 - / 490.452 - / 69.713 - / 109.687 - / 128.037 - / - - / 128.037 / 4,877.386 - / 344.832 - / 380.265 - / 421.735 - / - - / 421.735 - - *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 base budget supports critical Army Title 10 war reserve/operational, training, and test requirements in accordance with DoDI 3000.04 (Munitions Requirements Process) and AR 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War (OSW)-approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life-cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. FY 2027 Total Base dollars in the amount of $421.735 million supports the procurement of 0.070 million cartridges (E73201) M1002 (TPMP-T) This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base Procurement dollars in the amount of $65.107 million supports the procurement of 0.018 million cartridges. Type Classification Date: 2006 (E73400) M865A1 (Longer Length) This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base Procurement dollars in the amount of $158.986 million supports the procurement of 0.044 million cartridges. Type Classification Date: 1984 (E88105) M1147 (HEMP-T) This is a war reserve item used in combat. FY 2027 request builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base Procurement dollars in the amount of $69.605 million supports the procurement of 0.004 million cartridges. Type Classification Date: 2022 (E88106) M829A4 (APFSDS-T) LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army UNCLASSIFIED Page 3 of 32 P-1 Line #14 Volume 1 - 390 === page 423 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 35: Tank Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A This is a war reserve item used in combat. FY 2027 request builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base Procurement dollars in the amount of $128.037 million supports the procurement of 0.004 million cartridges. Type Classification Date: 2015 LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army UNCLASSIFIED Page 4 of 32 P-1 Line #14 Volume 1 - 391 === page 424 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E73201 / CTG, 120mm Tank, M1002 TP MULTI PUR-TRACE (TPMP-T) [CA31] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 55.433 62.983 65.107 - 65.107 - Gross/Weapon System Cost ($ in Millions) 926.631 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 926.631 Plus CY Advance Procurement ($ in Millions) - - - - - 55.433 62.983 65.107 - 65.107 - Total Obligation Authority ($ in Millions) 926.631 FY 2027 Total - - - - - 55.433 62.983 65.107 - 65.107 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements FY 2025 ($) Qty (Each) Total Cost 2,290.63 368,519 844.142 Unit Cost ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE ROUND (†) Subtotal: Recurring Cost 2,678.99 14,357 38.462 2,769.19 19,642 54.392 3,140.87 18,060 56.724 - - - 3,140.87 18,060 56.724 - - 844.142 - - 38.462 - - 54.392 - - 56.724 - - - - - 56.724 - - 844.142 - - 38.462 - - 54.392 - - 56.724 - - - - - 56.724 Acceptance Test - - 6.522 - - 4.441 - - 1.434 - - 0.748 - - - - - 0.748 First Article Test - - 1.157 - - 0.298 - - 0.305 - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 7.679 - - 4.739 - - 1.739 - - 0.748 - - - - - 0.748 Value Engineering - - 0.419 - - - - - - - - - - - - - - - Subtotal: Support - NonRecurring Support Cost - - 0.419 - - - - - - - - - - - - - - - Production Verification Test - - 2.340 - - - - - - - - - - - - - - - Safety - - 17.566 - - - - - - - - - - - - - - - Reliability - - 7.260 - - 6.616 - - - - - - - - - - - - - - 27.166 - - 6.616 - - - - - - - - - - - - Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Non-Recurring Support Cost Support - Product Improvement Cost Subtotal: Support - Product Improvement Cost LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army UNCLASSIFIED Page 5 of 32 P-1 Line #14 Volume 1 - 392 === page 425 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E73201 / CTG, 120mm Tank, M1002 TP MULTI PUR-TRACE (TPMP-T) [CA31] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Support - Production Engineering Cost Production Engineering - - 47.110 - - 4.636 - - 6.821 - - 7.606 - - - - - 7.606 Subtotal: Support Production Engineering Cost - - 47.110 - - 4.636 - - 6.821 - - 7.606 - - - - - 7.606 Quality Assurance - - 0.063 - - 0.030 - - 0.031 - - 0.029 - - - - - 0.029 Subtotal: Support - Quality Assurance Cost - - 0.063 - - 0.030 - - 0.031 - - 0.029 - - - - - 0.029 Support - Quality Assurance Cost Support - Study & Analysis Cost - - 0.052 - - 0.950 - - - - - - - - - - - - Subtotal: Support - Study & Analysis Cost Study & Analysis - - 0.052 - - 0.950 - - - - - - - - - - - - Gross/Weapon System Cost - - 926.631 - - 55.433 - - 62.983 - - 65.107 - - - - - 65.107 Remarks: Price differences FY 2025 through FY 2027 are due to step ladder pricing matrices based on quantity ranges, as well as negotiated Economic Price Adjustments (EPA), and decisions to change the percentage executed between competing vendors determined during execution. (†) indicates the presence of a P-5a LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army UNCLASSIFIED Page 6 of 32 P-1 Line #14 Volume 1 - 393 === page 426 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: E73201 / CTG, 120mm Tank, M1002 TP MULTI PUR-TRACE (TPMP-T) [CA31] Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 GENERAL DYNAMICS ORD AND TACT / ST PETERSBURG, FL Option / FFP ROCK ISLAND ARSENAL, IL Jun 2025 Jul 2026 5,743 2,678.99 Y 2025 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP ROCK ISLAND ARSENAL, IL Jun 2025 Jul 2026 8,614 2,678.99 Y 2026 GENERAL DYNAMICS ORD AND TACT / ST PETERSBURG, FL Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Feb 2027 7,856 2,769.19 Y 2026 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Feb 2027 11,786 2,769.19 Y 2027 TO BE SELECTED / TBS01 Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Feb 2028 9,030 3,140.87 Y 2027 TO BE SELECTED / TBS02 Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Feb 2028 9,030 3,140.87 Y (Each) RFP Issue Date indicates the presence of a P-21 Remarks: Complete round is an average unit cost between two contractors. The quantity split will be determined between the two contractors in the year of execution. FY 2027 will be a new contract for this round. LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army UNCLASSIFIED Page 7 of 32 P-1 Line #14 Volume 1 - 394 === page 427 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E73201 / CTG, 120mm Tank, M1002 TP MULTI PUR-TRACE (TPMP-T) [CA31] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R J U L A U G S E P B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N COMPLETE ROUND Prior Years Deliveries: 368519 1 2025 ARMY 5.743 .000 5.743 A - - - - - - - - - - - - - .480 .478 .478 4.307 2 2025 ARMY 8.614 .000 8.614 A - - - - - - - - - - - - - .722 .717 .717 6.458 1 2026 ARMY 7.856 .000 7.856 A - - - - - - - 7.856 2 2026 ARMY 11.786 .000 11.786 A - - - - - - - 11.786 3 2027 ARMY 9.030 .000 9.030 4 2027 ARMY 9.030 .000 9.030 9.030 9.030 O C T N O V D E C J A N F E B LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 32 S E P O C T N O V D E C J A N F E B P-1 Line #14 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 395 === page 428 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E73201 / CTG, 120mm Tank, M1002 TP MULTI PUR-TRACE (TPMP-T) [CA31] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND Prior Years Deliveries: 368519 1 2025 ARMY 5.743 1.436 4.307 .478 .478 .478 .478 .478 .478 .478 .478 .483 2 2025 ARMY 8.614 2.156 6.458 .717 .717 .717 .717 .717 .717 .717 .717 .722 1 2026 ARMY 7.856 .000 7.856 - - - - .658 .654 .654 .654 .654 .654 .654 .654 .654 .654 .654 .658 2 2026 ARMY 11.786 .000 11.786 - - - - .984 .982 .982 .982 .982 .982 .982 .982 .982 .982 .982 .982 3 2027 ARMY 9.030 .000 9.030 A - - - - - - - - - - - .758 4 2027 ARMY 9.030 .000 9.030 - .758 .752 F E B M A R A O C T N O V D E C J A N F E B LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army M A R A P R M A Y .000 .000 J U N J U L A U G UNCLASSIFIED Page 9 of 32 S E P O C T N O V D E C J A N .000 .000 P-1 Line #14 .752 .752 .752 .752 .752 .752 .752 .752 .752 A P R M A Y J U N J U L .752 .752 3.008 .752 .752 3.008 A U G S E P Volume 1 - 396 === page 429 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E73201 / CTG, 120mm Tank, M1002 TP MULTI PUR-TRACE (TPMP-T) [CA31] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND Prior Years Deliveries: 368519 1 2025 ARMY 5.743 5.743 .000 .000 2 2025 ARMY 8.614 8.614 .000 .000 1 2026 ARMY 7.856 7.856 .000 .000 2 2026 ARMY 11.786 11.786 .000 3 2027 ARMY 9.030 6.022 3.008 .752 .752 .752 .752 4 2027 ARMY 9.030 6.022 3.008 .752 .752 .752 .752 O C T N O V D E C J A N .000 .000 .000 F E B LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 32 S E P O C T N O V D E C J A N F E B P-1 Line #14 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 397 === page 430 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E73201 / CTG, 120mm Tank, M1002 TP MULTI PUR-TRACE (TPMP-T) [CA31] Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 GENERAL DYNAMICS ORD AND TACT - ST PETERSBURG, FL 500 8,000 24,000 6 6 11 17 6 6 11 17 2 NORTHROP GRUMMAN SYSTEMS CORP PLYMOUTH, MN 500 8,000 24,000 6 6 11 17 6 6 11 17 3 TO BE SELECTED - TBS01 500 8,000 24,000 6 6 11 17 6 6 11 17 4 TO BE SELECTED - TBS02 500 8,000 24,000 6 6 11 17 6 6 11 17 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army UNCLASSIFIED Page 11 of 32 P-1 Line #14 Volume 1 - 398 === page 431 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E73400 / CTG, 120mm Tank TPCSDS-T, M865 [CA69] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) - 3,160.021 Less PY Advance Procurement ($ in Millions) 156.277 - Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) 158.986 - - - 127.179 158.986 - 158.986 - 156.277 FY 2027 Total - - 127.179 - 3,160.021 - - 156.277 - Total Obligation Authority ($ in Millions) FY 2027 OOC - 127.179 - 3,160.021 FY 2027 Base - 158.986 - 158.986 - - 158.986 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years FY 2025 ($) Qty (Each) Total Cost (†) 790.21 3,902,790 3,084.008 Subtotal: Recurring Cost - - 3,084.008 - - 3,084.008 First Article Test - - Acceptance Test - - Subtotal: Support Acceptance Testing Cost - Reliability Production Qualification Test FY 2026 Qty Total Cost 51,575 146.422 - - 146.422 - - 146.422 1.139 - - 5.224 - - - 6.363 - - - 13.125 - - Safety - Production Verification Test - Subtotal: Support - Product Improvement Cost Cost Elements FY 2027 Base Qty Total Cost 38,560 117.608 - - 117.608 - - 117.608 0.336 - - 2.062 - - - 2.398 - - - 3.361 0.394 - - - 10.723 - - 0.061 - - - 24.303 - - 45.087 Unit Cost ($ M) FY 2027 OOC FY 2027 Total Qty Total Cost 44,321 147.596 - - - - - 147.596 - - - - - 147.596 - - - 0.333 - - - - - 0.748 - - 0.643 - - - 1.081 - - 0.643 - - - - - - 0.466 - - - - - - - - - - - - - - - - - - - - 3.361 - - - - - 4.036 - - 8.459 Unit Cost ($) (Each) Unit Cost ($ M) ($) (Each) Qty Total Cost 44,321 147.596 - - 147.596 - - 147.596 - - - - - - - 0.643 - - - - 0.643 - - - - - 0.466 - - - - - - - - 0.250 - - - - - 0.250 - - - - - - - - - - 0.716 - - - - - 0.716 - - 10.002 - - - - - 10.002 Unit Cost ($ M) ($) (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) Unit Cost ($ M) ($) (Each) ($ M) Hardware Cost Recurring Cost COMPLETE ROUND Subtotal: Hardware Cost 2,839.01 3,050.00 3,330.15 3,330.15 Support - Acceptance Testing Cost Support - Product Improvement Cost Support - Production Engineering Cost Production Engineering LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army UNCLASSIFIED Page 12 of 32 P-1 Line #14 Volume 1 - 399 === page 432 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E73400 / CTG, 120mm Tank TPCSDS-T, M865 [CA69] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Subtotal: Support Production Engineering Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 45.087 - - 4.036 - - 8.459 - - 10.002 - - - - - 10.002 Quality Assurance - - 0.076 - - 0.060 - - 0.031 - - 0.029 - - - - - 0.029 Subtotal: Support - Quality Assurance Cost - - 0.076 - - 0.060 - - 0.031 - - 0.029 - - - - - 0.029 Support - Quality Assurance Cost Support - Study & Analysis Cost - - 0.184 - - - - - - - - - - - - - - - Subtotal: Support - Study & Analysis Cost Study & Analysis - - 0.184 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 3,160.021 - - - - - - - - - - - 156.277 127.179 158.986 158.986 Remarks: Price differences FY 2025 through FY 2027 are due to step ladder pricing matrices based on quantity ranges, as well as negotiated Economic Price Adjustments (EPA), and decisions to change the percentage executed between competing vendors determined during execution. (†) indicates the presence of a P-5a LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army UNCLASSIFIED Page 13 of 32 P-1 Line #14 Volume 1 - 400 === page 433 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: E73400 / CTG, 120mm Tank TPCSDS-T, M865 [CA69] Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 GENERAL DYNAMICS ORD AND TACT SYS / ST PETERSBURG, FL Option / FFP ROCK ISLAND ARSENAL, IL Jun 2025 Jun 2026 20,630 2,839.01 Y 2025 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP ROCK ISLAND ARSENAL, IL Jun 2025 Jun 2026 30,945 2,839.01 Y 2026 GENERAL DYNAMICS ORD AND TACT SYS / ST PETERSBURG, FL Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 15,424 3,050.00 Y 2026 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP ROCK ISLAND ARSENAL, IL May 2026 May 2027 23,136 3,050.00 Y 2027 TO BE SELECTED / TBS02 C / FFP ROCK ISLAND ARSENAL, IL May 2027 May 2028 26,593 3,330.15 Y 2027 TO BE SELECTED / TBS01 C / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 17,728 3,330.15 Y (Each) RFP Issue Date indicates the presence of a P-21 Remarks: Complete round is an average unit cost between two contractors. The quantity split will be determined between the two contractors in the year of execution. FY 2027 will be a new contract. LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army UNCLASSIFIED Page 14 of 32 P-1 Line #14 Volume 1 - 401 === page 434 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E73400 / CTG, 120mm Tank TPCSDS-T, M865 [CA69] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 3902790 1 2025 ARMY 20.630 .000 20.630 A - - - - - - - - - - - - 1.721 1.719 1.719 1.719 13.752 2 2025 ARMY 30.945 .000 30.945 A - - - - - - - - - - - - 2.583 2.578 2.578 2.578 20.628 1 2026 ARMY 15.424 .000 15.424 A - - - - - - - 15.424 2 2026 ARMY 23.136 .000 23.136 A - - - - - 23.136 3 2027 ARMY 26.593 .000 26.593 4 2027 ARMY 17.728 .000 17.728 26.593 17.728 O C T N O V D E C J A N F E B LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 32 S E P O C T N O V D E C J A N F E B P-1 Line #14 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 402 === page 435 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E73400 / CTG, 120mm Tank TPCSDS-T, M865 [CA69] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND Prior Years Deliveries: 3902790 1 2025 ARMY 20.630 6.878 13.752 1.719 1.719 1.719 1.719 1.719 1.719 1.719 1.719 2 2025 ARMY 30.945 10.317 20.628 2.578 2.578 2.578 2.578 2.578 2.578 2.578 2.582 1 2026 ARMY 15.424 .000 15.424 - - - - - 1.289 1.285 1.285 1.285 1.285 1.285 1.285 1.285 1.285 1.285 1.285 1.285 2 2026 ARMY 23.136 .000 23.136 - - - - - - - 1.928 1.928 1.928 1.928 1.928 1.928 1.928 1.928 1.928 1.928 1.928 1.928 3 2027 ARMY 26.593 .000 26.593 A - - - - - - - - - - - - 2.216 2.216 2.216 2.216 2.216 15.513 4 2027 ARMY 17.728 .000 17.728 - 1.477 1.477 1.477 1.477 1.477 1.477 1.477 M A R A P R M A Y J U N J U L A U G S E P A O C T N O V D E C J A N F E B LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army M A R A P R .000 .000 M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 32 S E P O C T N O V D E C J A N F E B P-1 Line #14 .000 .000 7.389 Volume 1 - 403 === page 436 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E73400 / CTG, 120mm Tank TPCSDS-T, M865 [CA69] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND Prior Years Deliveries: 3902790 1 2025 ARMY 20.630 20.630 .000 .000 2 2025 ARMY 30.945 30.945 .000 .000 1 2026 ARMY 15.424 15.424 .000 .000 2 2026 ARMY 23.136 23.136 .000 3 2027 ARMY 26.593 11.080 15.513 2.216 2.216 2.216 2.216 2.216 4 2027 ARMY 17.728 10.339 1.477 1.477 1.477 1.477 1.481 O C T N O V D E C J A N F E B 7.389 .000 LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army 2.216 2.217 M A R A P R .000 .000 M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 32 S E P O C T N O V D E C J A N F E B P-1 Line #14 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 404 === page 437 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E73400 / CTG, 120mm Tank TPCSDS-T, M865 [CA69] Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 GENERAL DYNAMICS ORD AND TACT SYS - ST PETERSBURG, FL 500 8,000 24,000 6 6 12 18 6 6 12 18 2 NORTHROP GRUMMAN SYSTEMS CORP PLYMOUTH, MN 500 8,000 24,000 6 6 12 18 6 8 12 20 3 TO BE SELECTED - TBS02 500 8,000 24,000 6 8 12 20 6 8 12 20 4 TO BE SELECTED - TBS01 500 8,000 24,000 6 6 12 18 6 6 12 18 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army UNCLASSIFIED Page 18 of 32 P-1 Line #14 Volume 1 - 405 === page 438 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E88105 / CTG, 120MM TANK, HEMP-T, M1147 [CA71] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 63.409 80.416 69.605 - 69.605 - Gross/Weapon System Cost ($ in Millions) 300.282 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 300.282 Plus CY Advance Procurement ($ in Millions) - - - - - 63.409 80.416 69.605 - 69.605 - Total Obligation Authority ($ in Millions) 300.282 FY 2027 Total - - - - - 63.409 80.416 69.605 - 69.605 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years FY 2025 Qty Total Cost 14,002 152.817 - - 152.817 - - 152.817 First Article Test - - Acceptance Test - - Subtotal: Support Acceptance Testing Cost - Cost Elements Unit Cost ($) (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE 3,881 56.663 - - 56.663 - - 56.663 20.064 - - 11.062 - - - 31.126 - - - 25.000 - - Reliability - Safety - ROUND (†) 10,913.93 Subtotal: Recurring Cost Subtotal: Hardware Cost 14,600.00 15,976.19 4,632 74.002 - - 74.002 - - 74.002 - - - - - - - - - - - - 25.000 - - - 28.062 - - 0.438 - - - 28.500 - - 16.117 16,295.71 3,756 61.207 - - - - - 61.207 - - - - - 61.207 - - - - - - 0.384 - - - - - - - - - - - - 0.384 - - - - - - - - - - - - - - 1.616 - - - - - - - - - - - - 1.616 - - - - - 5.130 - - 6.414 16,295.71 3,756 61.207 - - 61.207 - - 61.207 - - - 0.384 - - - - - - - - 0.384 - - - - - - - - - - - - - - 0.208 - - - - - 0.208 - - - - - - - - - - 0.208 - - - - - 0.208 - - 7.806 - - - - - 7.806 Support - Acceptance Testing Cost Support - Non-Recurring Support Cost Facilitization Subtotal: Support - NonRecurring Support Cost Support - Product Improvement Cost Subtotal: Support - Product Improvement Cost Support - Production Engineering Cost Production Engineering LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army UNCLASSIFIED Page 19 of 32 P-1 Line #14 Volume 1 - 406 === page 439 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E88105 / CTG, 120MM TANK, HEMP-T, M1147 [CA71] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Subtotal: Support Production Engineering Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 16.117 - - 5.130 - - 6.414 - - 7.806 - - - - - 7.806 Support - Study & Analysis Cost - - 46.722 - - - - - - - - - - - - - - - Subtotal: Support - Study & Analysis Cost Study & Analysis - - 46.722 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 300.282 - - 63.409 - - 80.416 - - 69.605 - - - - - 69.605 Remarks: Ammunition costs have increased greater than the historical inflation rates of 2-3%, due to significant increases to metals, manufacturing labor costs, and market volatility. (†) indicates the presence of a P-5a LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army UNCLASSIFIED Page 20 of 32 P-1 Line #14 Volume 1 - 407 === page 440 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: E88105 / CTG, 120MM TANK, HEMP-T, M1147 [CA71] Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN C / FFP PICATINNY ARSENAL, NJ Aug 2025 Aug 2026 3,881 14,600.00 N 2026 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP PICATINNY ARSENAL, NJ Mar 2026 Mar 2027 4,632 15,976.19 N 2027 NORTHROP GRUMMAN INNOVATION SYSTEMS / PLYMOUTH, MN Option / FFP PICATINNY ARSENAL, NJ Mar 2027 Mar 2028 3,756 16,295.71 N (Each) RFP Issue Date indicates the presence of a P-21 LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army UNCLASSIFIED Page 21 of 32 P-1 Line #14 Volume 1 - 408 === page 441 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 Cost Elements (Units in Each) O O C M F R # FY SERVICE Item Number / Title [DODIC]: E88105 / CTG, 120MM TANK, HEMP-T, M1147 [CA71] Fiscal Year 2025 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 14002 1 2025 ARMY 3,881 0 3,881 1 2026 ARMY 4,632 0 4,632 2 2027 ARMY 3,756 0 3,756 A - - - - - - - - - - - - 328 323 3,230 A - - - - - - - 4,632 3,756 O C T N O V D E C J A N F E B LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 22 of 32 S E P O C T N O V D E C J A N F E B P-1 Line #14 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 409 === page 442 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E88105 / CTG, 120MM TANK, HEMP-T, M1147 [CA71] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND Prior Years Deliveries: 14002 1 2025 ARMY 3,881 651 3,230 323 323 323 323 323 323 323 323 323 323 1 2026 ARMY 4,632 0 4,632 - - - - - 386 386 386 386 386 386 386 386 386 386 386 386 2 2027 ARMY 3,756 0 3,756 - - - - - - - - - - - A O C T N O V D E C J A N F E B LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army M A R A P R M A Y J U N J U L 0 A U G UNCLASSIFIED Page 23 of 32 S E P O C T N O V D E C J A N F E B P-1 Line #14 0 313 313 313 313 313 313 313 M A R A P R M A Y J U N J U L A U G S E P 1,565 Volume 1 - 410 === page 443 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E88105 / CTG, 120MM TANK, HEMP-T, M1147 [CA71] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND Prior Years Deliveries: 14002 1 2025 ARMY 3,881 3,881 0 1 2026 ARMY 4,632 4,632 0 2 2027 ARMY 3,756 2,191 1,565 0 0 313 313 313 313 313 O C T N O V D E C J A N F E B LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army 0 M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 24 of 32 S E P O C T N O V D E C J A N F E B P-1 Line #14 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 411 === page 444 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E88105 / CTG, 120MM TANK, HEMP-T, M1147 [CA71] Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 NORTHROP GRUMMAN SYSTEMS CORP PLYMOUTH, MN 100 500 2,000 6 9 12 21 6 6 12 18 2 NORTHROP GRUMMAN INNOVATION SYSTEMS PLYMOUTH, MN 100 500 2,000 6 6 12 18 6 6 12 18 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army UNCLASSIFIED Page 25 of 32 P-1 Line #14 Volume 1 - 412 === page 445 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E88106 / CTG, 120mm Tank APFSDS-T, M829A4 [CA64] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) - 490.452 Less PY Advance Procurement ($ in Millions) 69.713 - Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) 128.037 - - - 109.687 128.037 - 128.037 - 69.713 FY 2027 Total - - 109.687 - 490.452 - - 69.713 - Total Obligation Authority ($ in Millions) FY 2027 OOC - 109.687 - 490.452 FY 2027 Base - 128.037 - 128.037 - - 128.037 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years FY 2025 Qty Total Cost 25,678 388.824 - - 388.824 - - 388.824 First Article Test - - Acceptance Test - - Subtotal: Support Acceptance Testing Cost - Value Engineering Subtotal: Support - NonRecurring Support Cost Cost Elements Unit Cost ($) (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE 2,266 61.763 - - 61.763 - - 61.763 5.756 - - 1.367 - - - 7.123 - - - 6.030 - - Production Verification Test - - Safety - Reliability - ROUND (†) 15,142.29 Subtotal: Recurring Cost Subtotal: Hardware Cost 27,256.34 31,085.68 3,131 97.329 - - 97.329 - - 97.329 0.506 - - - - - - 0.506 - - - - 6.030 - - 3.210 - - - 7.718 - - 16.448 - - 27.376 - 31,707.39 3,744 118.712 - - - - - 118.712 - - - - - 118.712 - - - 0.506 - - - - - - - - 0.518 - - - 0.506 - - 0.518 - - - - - - - - - - - - - - - - - - - - - - - - 1.553 - - 3.034 - 1.553 - - 3.034 31,707.39 3,744 118.712 - - 118.712 - - 118.712 - - - - - - - 0.518 - - - - 0.518 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Support - Acceptance Testing Cost Support - Non-Recurring Support Cost Support - Product Improvement Cost Subtotal: Support - Product Improvement Cost LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army UNCLASSIFIED Page 26 of 32 P-1 Line #14 Volume 1 - 413 === page 446 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E88106 / CTG, 120mm Tank APFSDS-T, M829A4 [CA64] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Support - Production Engineering Cost Production Engineering - - 56.878 - - 5.891 - - 8.818 - - 8.807 - - - - - 8.807 Subtotal: Support Production Engineering Cost - - 56.878 - - 5.891 - - 8.818 - - 8.807 - - - - - 8.807 - - 0.301 - - - - - - - - - - - - - - - - - 0.301 - - - - - - - - - - - - - - - Support - Staging and Transportation Cost Staging and Transportation Subtotal: Support - Staging and Transportation Cost Support - Study & Analysis Cost - - 3.920 - - - - - - - - - - - - - - - Subtotal: Support - Study & Analysis Cost Study & Analysis - - 3.920 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 490.452 - - 69.713 - - - - - - - - - 109.687 128.037 128.037 Remarks: Increase to the budget request between FY 2025 and FY 2026/FY 2027 to meet war reserve requirement. Increase in Production Engineering between FY 2025 and FY 2026/FY 2027 is commensurate with increase in procurement quantity. (†) indicates the presence of a P-5a LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army UNCLASSIFIED Page 27 of 32 P-1 Line #14 Volume 1 - 414 === page 447 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: E88106 / CTG, 120mm Tank APFSDS-T, M829A4 [CA64] Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 GENERAL DYNAMICS ORD AND TACT SYS / ST PETERSBURG, FL C / FFP PICATINNY ARSENAL, NJ Jun 2025 Aug 2026 2,266 27,256.34 Y 2026 GENERAL DYNAMICS ORD AND TACT SYS / ST PETERSBURG, FL Option / FFP PICATINNY ARSENAL, NJ Mar 2026 May 2027 3,131 31,085.68 Y 2027 TO BE SELECTED / TBS02 C / FFP PICATINNY ARSENAL, NJ Mar 2027 Jun 2028 3,744 31,707.39 Y (Each) RFP Issue Date indicates the presence of a P-21 LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army UNCLASSIFIED Page 28 of 32 P-1 Line #14 Volume 1 - 415 === page 448 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 Cost Elements (Units in Each) O O C M F R # FY SERVICE Item Number / Title [DODIC]: E88106 / CTG, 120mm Tank APFSDS-T, M829A4 [CA64] Fiscal Year 2025 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 25678 1 2025 ARMY 2,266 0 2,266 1 2026 ARMY 3,131 0 3,131 2 2027 ARMY 3,744 0 3,744 A - - - - - - - - - - - - - - 189 189 1,888 A - - - - - - - 3,131 3,744 O C T N O V D E C J A N F E B LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 29 of 32 S E P O C T N O V D E C J A N F E B P-1 Line #14 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 416 === page 449 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E88106 / CTG, 120mm Tank APFSDS-T, M829A4 [CA64] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND Prior Years Deliveries: 25678 1 2025 ARMY 2,266 378 1,888 189 189 189 189 189 189 189 189 188 188 1 2026 ARMY 3,131 0 3,131 - - - - - - - 266 260 260 260 260 260 260 260 260 260 260 265 2 2027 ARMY 3,744 0 3,744 A - - - - - - - - - - - - - - O C T N O V D E C J A N F E B LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army M A R A P R M A Y J U N J U L 0 A U G UNCLASSIFIED Page 30 of 32 S E P O C T N O V D E C J A N F E B P-1 Line #14 M A R A P R 0 M A Y 312 312 312 312 J U N J U L A U G S E P 2,496 Volume 1 - 417 === page 450 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E88106 / CTG, 120mm Tank APFSDS-T, M829A4 [CA64] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND Prior Years Deliveries: 25678 1 2025 ARMY 2,266 2,266 0 1 2026 ARMY 3,131 3,131 0 2 2027 ARMY 3,744 1,248 2,496 0 0 312 312 312 312 312 312 312 312 O C T N O V D E C J A N F E B M A R A P R M A Y LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army 0 J U N J U L A U G UNCLASSIFIED Page 31 of 32 S E P O C T N O V D E C J A N F E B P-1 Line #14 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 418 === page 451 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 1120E22203 / Cartridges, Tank, 105MM And 120MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 35 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E88106 / CTG, 120mm Tank APFSDS-T, M829A4 [CA64] Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 GENERAL DYNAMICS ORD AND TACT SYS - ST PETERSBURG, FL 1,000 3,000 5,000 6 6 15 21 6 6 15 21 2 TO BE SELECTED - TBS02 1,000 3,000 5,000 6 6 15 21 6 6 15 21 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 1120E22203 - Cartridges, Tank, 105MM And 120MM, All T... Army UNCLASSIFIED Page 32 of 32 P-1 Line #14 Volume 1 - 419 === page 452 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 37: Artillery Ammunition P-1 Line Item Number / Title: 0530E15101 / Artillery Cartridges, 75MM & 105MM, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 3,087.644 3,087.644 3,087.644 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 59.711 80.780 48.841 - 48.841 40.379 50.131 38.150 38.702 - - - - - - - - - - - 59.711 80.780 48.841 - 48.841 40.379 50.131 38.150 38.702 - - - - - - - - - - - 59.711 80.780 48.841 - 48.841 40.379 50.131 38.150 38.702 - Total 3,444.338 3,444.338 3,444.338 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: (E15101) Artillery Cartridges, 75mm And 105mm, All Types This budget line includes Cartridge, Artillery, 75mm & 105mm, All Types. (E21501) CTG, ARTY, 105mm HE, M1 W/O FUZE The 105mm M1 High Explosive (HE) cartridge contains an HE fill and is used primarily for training although some cartridges are expended in combat operations for fragmentation and blast. The cartridge is loaded with an M67 propellant charge, consisting of seven numbered increment bags sewn together in numerical order. Projectile function is dependent upon the fuze used and may function on impact (instantaneous or delay), above ground at a predetermined height or in proximity to the target area. Fuze function detonates the HE projectile filler resulting in projectile fragmentation and blast. Range varies from 3.5 to 11.3 kilometers, depending on the number of charge bags used. The program remanufactures/recapitalizes the remaining unserviceable cartridges through replacement of M67 Prop Charge and Primer at a reduced cost over new production to provide a cost-effective training cartridge. This item is Code A, approved for service use. (E22002) CTG, ARTY, 105mm SMOKE HC, M84 W/O FUZE The 105mm M84 Hexachloroethane (HC) Zinc Oxide Smoke compatible with the M762 series Electronic Time (ET) Fuze is a semi-fixed smoke cartridge which is comprised of the M14 Cartridge Case, M28Percussion Primer, M67 Propellant Charge, and a projectile that contains the pinned base plug, a black powder expelling charge and three HC smoke canisters. Each metal canister contains a core igniter flash tube, a first fire mix and the HC smoke composition. When ignited, HC composition produces a caustic white smoke. The M84A1 Cartridge is loaded and fired in a conventional manner. As the round approaches the target area, the fuze ignites the black powder expelling charge which simultaneously ignites and expels the three HC canisters from the base of the carrier. The smoke canisters fall to the ground producing billowing clouds of smoke which last from 40 to 90 seconds. The HC Smoke is less toxic and less incendiary than White Phosphorous (WP) and can be used on ranges that that prohibit WP rounds for training due to environmental restrictions. This item is Code A, approved for service use. LI 0530E15101 - Artillery Cartridges, 75MM & 105MM, All ... Army UNCLASSIFIED Page 1 of 18 P-1 Line #15 Volume 1 - 420 === page 453 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 37: Artillery Ammunition P-1 Line Item Number / Title: 0530E15101 / Artillery Cartridges, 75MM & 105MM, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD P-5 E21501 / CTG, 105mm ARTY HE, M1 w/o Fuze [C445] P-5a, P-21 A P-5 E22002 / CTG, ARTY, 105MM SMOKE HC M84 W/O FUZE P-5a, P-21 A P-40 Total Gross/Weapon System Cost MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 3,087.155 - / 58.402 - / 63.241 - / 37.340 - / - - / 37.340 / 0.489 - / 1.309 - / 17.539 - / 11.501 - / - - / 11.501 / 3,087.644 - / 59.711 - / 80.780 - / 48.841 - / - - / 48.841 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Base Budget supports critical Army Title 10 war reserve/operational, training, and test requirements IAW DoD Instruction 3000.04 (Munitions Requirements Process) and AR 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War (OSW) approved Combatant Commander operational plans, homeland defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. FY 2027 Total Base dollars in the amount of $48.841 million supports the production of 26,195 M1 high explosive cartridges and 4,448 M84 smoke cartridges. (E21501) CTG, ARTY, 105mm HE, M1 W/O FUZE This program will remanufacture/recapitalize unserviceable rounds in the inventory. This is a training standard item used in both training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army procurement goals. FY 2027 total base dollars in the amount of $37.340 million supports the procurement of 26,195 M1 High Explosive cartridges. TYPE CLASSIFICATION DATE: 1966 (E22002) CTG, ARTY, 105mm SMOKE HC, M84 W/O FUZE This is a training standard item used in both training and combat. The FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army procurement goals. FY 2027 total base dollars in the amount of $11.501 million supports the procurement of 4,448 M84 smoke cartridges. TYPE CLASSIFICATION DATE: 1978 LI 0530E15101 - Artillery Cartridges, 75MM & 105MM, All ... Army UNCLASSIFIED Page 2 of 18 P-1 Line #15 Volume 1 - 421 === page 454 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0530E15101 / Artillery Cartridges, 75MM & 105MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E21501 / CTG, 105mm ARTY HE, M1 w/ o Fuze [C445] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 58.402 63.241 37.340 - 37.340 - Gross/Weapon System Cost ($ in Millions) 3,087.155 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 3,087.155 Plus CY Advance Procurement ($ in Millions) - - - - - 58.402 63.241 37.340 - 37.340 - Total Obligation Authority ($ in Millions) 3,087.155 FY 2027 Total - - - - - 58.402 63.241 37.340 - 37.340 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements FY 2025 Total Cost Qty Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty ($) (Each) (Each) ($ M) 120.62 743,526 89.680 401.92 80,001 32.154 660.58 50,506 33.363 726.54 26,195 19.032 - - - 726.54 26,195 19.032 41.47 57,820 2.398 115.19 67,353 7.758 118.75 51,516 6.118 121.24 26,718 3.239 - - - 121.24 26,718 3.239 104.68 638,052 66.791 244.42 82,236 20.100 270.94 51,516 13.958 276.55 26,718 7.389 - - - 276.55 26,718 7.389 21.90 606,887 13.291 26.70 82,654 2.207 44.76 51,516 2.306 46.11 26,718 1.232 - - - 46.11 26,718 1.232 44.53 370,107 16.481 71.82 33,016 2.371 73.97 25,253 1.868 75.52 13,097 0.989 - - - 75.52 13,097 0.989 Hardware Cost Recurring Cost LOAD, ASSEMBLE, (†) PACK (LAP) CONTAINER AMMUNITION FIBER PA55 (†) M67 PROP CHARGE (†) PRIMER PERCUSSION (†) M28B2 BOX, PACKING (†) AMMO SUPPLEMENTARY (†) CHARGE,PROJECTILE WOODEN PALLETS (†) COMP B TYPE I GRADE A (†) Subtotal: Recurring Cost Subtotal: Hardware Cost - - - 13.47 15,301 0.206 - - - 21.88 26,718 0.585 - - - 21.88 26,718 0.585 132.50 31,554 4.181 170.83 1,395 0.238 - - - - - - - - - - - - - - - 15.10 340,020 5.134 - - - - - - - - - - - - - - 192.822 - - 70.169 - - 57.612 - - 32.466 - - - - - 32.466 - - 192.822 - - 70.169 - - 57.612 - - 32.466 - - - - - 32.466 LI 0530E15101 - Artillery Cartridges, 75MM & 105MM, All ... Army UNCLASSIFIED Page 3 of 18 P-1 Line #15 Volume 1 - 422 === page 455 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0530E15101 / Artillery Cartridges, 75MM & 105MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E21501 / CTG, 105mm ARTY HE, M1 w/ o Fuze [C445] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Support - Acceptance Testing Cost Acceptance Test - - 1.511 - - 0.762 - - - - - 0.150 - - - - - 0.150 First Article Test - - 10.432 - - 0.647 - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 11.943 - - 1.409 - - - - - 0.150 - - - - - 0.150 - - 6.092 - - 0.352 - - - - - - - - - - - - - - 6.092 - - 0.352 - - - - - - - - - - - - - - -1.655 - - -24.154 - - - - - - - - - - - - - - -1.655 - - -24.154 - - - - - - - - - - - - Facilitization - - 2.044 - - - - - - - - - - - - - - - Value Engineering - - - - - 5.500 - - - - - - - - - - - - Subtotal: Support - NonRecurring Support Cost - - 2.044 - - 5.500 - - - - - - - - - - - - Insensitive Munitions - - 0.340 - - - - - - - - - - - - - - - Production Qualification Test - - - - - 1.042 - - - - - - - - - - - - Subtotal: Support - Product Improvement Cost - - 0.340 - - 1.042 - - - - - - - - - - - - Production Engineering - - 13.088 - - 4.085 - - 5.627 - - 4.724 - - - - - 4.724 Subtotal: Support Production Engineering Cost - - 13.088 - - 4.085 - - 5.627 - - 4.724 - - - - - 4.724 Recapitalization - - 2,862.086 - - - - - - - - - - - - - - - Subtotal: Support Recapitalization Cost - - 2,862.086 - - - - - - - - - - - - - - - Support - Engineering Change Proposals Cost Engineering Change Proposals Subtotal: Support Engineering Change Proposals Cost Support - Government Furnished Materials Cost Government Furnished Materials Subtotal: Support Government Furnished Materials Cost Support - Non-Recurring Support Cost Support - Product Improvement Cost Support - Production Engineering Cost Support - Recapitalization Cost Support - System Engineering Cost LI 0530E15101 - Artillery Cartridges, 75MM & 105MM, All ... Army UNCLASSIFIED Page 4 of 18 P-1 Line #15 Volume 1 - 423 === page 456 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0530E15101 / Artillery Cartridges, 75MM & 105MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E21501 / CTG, 105mm ARTY HE, M1 w/ o Fuze [C445] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) System Engineering - - 0.395 - - - - - - - - - - - - - - - Subtotal: Support - System Engineering Cost - - 0.395 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 3,087.155 - - 58.402 - - 63.241 - - 37.340 - - - - - 37.340 Remarks: 105mm HE M1 Re-cap pricing to sunset in FY 2027. FY 2026 additional funding attributes to increased costs associated with a first time production contract to be awarded and associated support costs. (†) indicates the presence of a P-5a LI 0530E15101 - Artillery Cartridges, 75MM & 105MM, All ... Army UNCLASSIFIED Page 5 of 18 P-1 Line #15 Volume 1 - 424 === page 457 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 O O C Cost Elements P-1 Line Item Number / Title: 0530E15101 / Artillery Cartridges, 75MM & 105MM, All Types Method/Type or Funding Vehicle Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 BLUE GRASS ARMY DEPOT (BGAD) / RICHMOND, KY PO PICATINNY ARSENAL, NJ Mar 2025 Jun 2027 65,000 150.65 Y 2025 GEN DYNAMICS ORD & TAC SYS CANADA / LE GARDEUR, CANADA C / IDIQ ROCK ISLAND ARSNEAL, IL Jun 2025 Jun 2027 15,001 1,490.71 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Mar 2028 50,506 660.58 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 26,195 726.54 Y CONTAINER AMMUNITION FIBER PA55 2025 GOVERNMENT FURNISHED MATERIAL / STOCK ISSUE, GFM ROCK ISLAND ARSENAL, IL Jun 2025 Jun 2026 67,353 115.19 Y CONTAINER AMMUNITION FIBER PA55 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 51,516 118.75 Y CONTAINER AMMUNITION FIBER PA55 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 26,718 121.24 Y 2025 GEN DYNAMICS ORD & TAC SYS CANADA / LE GARDEUR, CANADA SS / IDIQ PICATINNY ARSENAL, NJ Jul 2025 Nov 2026 82,236 244.42 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Jul 2027 51,516 270.94 Y 2027 GEN DYNAMICS ORD & TAC SYS CANADA / LE GARDEUR, CANADA SS / IDDQ PICATINNY ARSENAL, NJ Mar 2027 Jul 2028 26,718 276.55 Y 2025 DAY & ZIMMERMANN LONE STAR LLC / TEXARKANA, TX SS / IDIQ ROCK ISLAND ARSENAL, IL Jul 2025 Jan 2027 82,654 26.70 Y 2026 DAY & ZIMMERMANN LONE STAR LLC / TEXARKANA, TX Option / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 51,516 44.76 Y 2027 DAY & ZIMMERMANN LONE STAR LLC / TEXARKANA, TX SS / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 26,718 46.11 Y 2025 GOVERNMENT FURNISHED MATERIAL / STOCK ISSUE, GFM ROCK ISLAND ARSENAL, IL Jun 2025 Feb 2027 33,016 71.82 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL May 2026 Nov 2027 25,253 73.97 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 13,097 75.52 Y SUPPLEMENTARY CHARGE,PROJECTILE 2025 ACCURATE ENERGETIC SYSTEMS, LLC / MC EWEN, TN C / IDIQ ROCK ISLAND ARSENAL, IL Jun 2025 Dec 2026 5,101 13.47 N SUPPLEMENTARY CHARGE,PROJECTILE 2025 SPECTRA TECHNOLOGIES LLC / CAMDEN, AR C / IDIQ ROCK ISLAND ARSENAL, IL Jun 2025 Dec 2026 10,200 13.47 N SUPPLEMENTARY CHARGE,PROJECTILE 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 26,718 21.88 Y LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) M67 PROP CHARGE M67 PROP CHARGE M67 PROP CHARGE PRIMER PERCUSSION M28B2 PRIMER PERCUSSION M28B2 PRIMER PERCUSSION M28B2 BOX, PACKING AMMO BOX, PACKING AMMO BOX, PACKING AMMO LI 0530E15101 - Artillery Cartridges, 75MM & 105MM, All ... Army Location of PCO Award Date Item Number / Title [DODIC]: E21501 / CTG, 105mm ARTY HE, M1 w/ o Fuze [C445] UNCLASSIFIED Page 6 of 18 P-1 Line #15 (Each) RFP Issue Date Volume 1 - 425 === page 458 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements WOODEN PALLETS COMP B TYPE I GRADE A (†) O O C P-1 Line Item Number / Title: 0530E15101 / Artillery Cartridges, 75MM & 105MM, All Types Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: E21501 / CTG, 105mm ARTY HE, M1 w/ o Fuze [C445] Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 MCALESTER ARMY AMMUNITION PLANT / MCALESTER, OK PO ROCK ISLAND ARSENAL, IL Mar 2025 Sep 2026 1,395 170.83 Y 2025 BAE SYSTEMS ORDNANCE SYSTEMS INC / KINGSPORT, TN Option / IDIQ ROCK ISLAND ARSENAL, IL Aug 2025 Aug 2026 340,020 15.10 Y (Each) RFP Issue Date indicates the presence of a P-21 Remarks: In FY 2027, cost increase is attributed to new production of 105MM HE M1. Recapitalization concludes in FY 2026. LI 0530E15101 - Artillery Cartridges, 75MM & 105MM, All ... Army UNCLASSIFIED Page 7 of 18 P-1 Line #15 Volume 1 - 426 === page 459 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0530E15101 / Artillery Cartridges, 75MM & 105MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Item Number / Title [DODIC]: E21501 / CTG, 105mm ARTY HE, M1 w/ o Fuze [C445] Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 743526 1 2025 ARMY 65.000 .000 65.000 3 2025 ARMY 15.001 .000 15.001 2 2026 ARMY 50.506 .000 50.506 2 2027 ARMY 26.195 .000 26.195 A - - - - - - - - - - - - - - - - - - - 65.000 A - - - - - - - - - - - - - - - - 15.001 A - - - - - - - 50.506 26.195 O C T N O V D E C J A N F E B LI 0530E15101 - Artillery Cartridges, 75MM & 105MM, All ... Army M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #15 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 427 === page 460 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0530E15101 / Artillery Cartridges, 75MM & 105MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Item Number / Title [DODIC]: E21501 / CTG, 105mm ARTY HE, M1 w/ o Fuze [C445] Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y Calendar Year 2028 J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N 5.416 5.416 5.416 5.416 5.416 5.416 5.416 5.416 5.416 5.424 J U L A U G S E P B A L A N C E LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 743526 1 2025 ARMY 65.000 .000 65.000 - - - - - - - - 5.416 5.416 3 2025 ARMY 15.001 .000 15.001 - - - - - - - - 10.000 5.001 2 2026 ARMY 50.506 .000 50.506 - - - - - - - - - - - - - - - - - 2 2027 ARMY 26.195 .000 26.195 A - - - - - - - - - - - - O C T N O V D E C J A N F E B LI 0530E15101 - Artillery Cartridges, 75MM & 105MM, All ... Army M A R A P R M A Y J U N J U L .000 A U G UNCLASSIFIED Page 9 of 18 .000 S E P O C T N O V D E C J A N F E B P-1 Line #15 10.000 10.000 10.000 10.000 10.506 M A R A P R M A Y J U N .000 J U L A U G 2.182 24.013 S E P Volume 1 - 428 === page 461 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0530E15101 / Artillery Cartridges, 75MM & 105MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Item Number / Title [DODIC]: E21501 / CTG, 105mm ARTY HE, M1 w/ o Fuze [C445] Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 743526 1 2025 ARMY 65.000 65.000 .000 .000 3 2025 ARMY 15.001 15.001 .000 .000 2 2026 ARMY 50.506 50.506 .000 2 2027 ARMY 26.195 2.182 24.013 .000 2.182 2.182 2.182 2.182 2.182 2.182 2.182 2.182 2.182 2.182 2.193 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G LI 0530E15101 - Artillery Cartridges, 75MM & 105MM, All ... Army UNCLASSIFIED Page 10 of 18 .000 S E P O C T N O V D E C J A N F E B P-1 Line #15 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 429 === page 462 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0530E15101 / Artillery Cartridges, 75MM & 105MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E21501 / CTG, 105mm ARTY HE, M1 w/ o Fuze [C445] Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 5,000 12,000 20,000 6 6 18 24 6 6 18 24 2 TO BE SELECTED - TO BE SELECTED 500 1,200 4,500 6 6 36 42 6 6 18 24 3 GEN DYNAMICS ORD & TAC SYS - CANADA - LE GARDEUR, CANADA 500 1,200 4,500 6 6 24 30 6 6 18 24 1 BLUE GRASS ARMY DEPOT (BGAD) RICHMOND, KY "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0530E15101 - Artillery Cartridges, 75MM & 105MM, All ... Army UNCLASSIFIED Page 11 of 18 P-1 Line #15 Volume 1 - 430 === page 463 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0530E15101 / Artillery Cartridges, 75MM & 105MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E22002 / CTG, ARTY, 105MM SMOKE HC M84 W/O FUZE MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 0.489 1.309 17.539 11.501 - 11.501 - - - - - - 0.489 1.309 17.539 11.501 - 11.501 - - - - - - 0.489 1.309 17.539 11.501 - 11.501 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) - - 0.000 - - - Subtotal: Recurring Cost - - - - - - - - - - - - Acceptance Test - - 0.000 - - First Article Test - - 0.000 - - Subtotal: Support Acceptance Testing Cost - - - - Production Engineering - - - Subtotal: Support Production Engineering Cost - - ROUND Subtotal: Hardware Cost 1,837.80 6,769 12.440 - - 12.440 - - 12.440 - - - - - - - - - - - 1.309 - - - 1,893.80 4,448 8.424 - - - - - 8.424 - - - - - 8.424 - - - 0.125 - - 0.175 - - 0.800 - - - - - - 0.925 - - 0.175 - - - 4.174 - - 2.902 1.309 - - 4.174 - - 1,893.80 4,448 8.424 - - 8.424 - - 8.424 - - - 0.175 - - - - - - - - 0.175 - - - - - 2.902 2.902 - - - - - 2.902 Support - Acceptance Testing Cost Support - Production Engineering Cost Support - System Engineering Cost System Engineering - - 0.489 - - - - - - - - - - - - - - - Subtotal: Support - System Engineering Cost - - 0.489 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 0.489 - - 1.309 - - 17.539 - - 11.501 - - - - - 11.501 LI 0530E15101 - Artillery Cartridges, 75MM & 105MM, All ... Army UNCLASSIFIED Page 12 of 18 P-1 Line #15 Volume 1 - 431 === page 464 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 P-1 Line Item Number / Title: 0530E15101 / Artillery Cartridges, 75MM & 105MM, All Types ID Code (A=Service Ready, B=Not Service Ready) : A (†) Item Number / Title [DODIC]: E22002 / CTG, ARTY, 105MM SMOKE HC M84 W/O FUZE MDAP/MAIS Code: indicates the presence of a P-5a LI 0530E15101 - Artillery Cartridges, 75MM & 105MM, All ... Army UNCLASSIFIED Page 13 of 18 P-1 Line #15 Volume 1 - 432 === page 465 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 0530E15101 / Artillery Cartridges, 75MM & 105MM, All Types Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: E22002 / CTG, ARTY, 105MM SMOKE HC M84 W/O FUZE Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 PINE BLUFF ARSENAL / PINE BLUFF, AR PO PICATINNY ARSENAL, NJ Mar 2026 Mar 2029 6,769 1,837.80 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Mar 2030 4,448 1,893.80 Y (Each) RFP Issue Date indicates the presence of a P-21 LI 0530E15101 - Artillery Cartridges, 75MM & 105MM, All ... Army UNCLASSIFIED Page 14 of 18 P-1 Line #15 Volume 1 - 433 === page 466 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0530E15101 / Artillery Cartridges, 75MM & 105MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Each) O O C M F R # FY SERVICE Fiscal Year 2026 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Item Number / Title [DODIC]: E22002 / CTG, ARTY, 105MM SMOKE HC M84 W/O FUZE Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND 1 2026 ARMY 6,769 0 6,769 2 2027 ARMY 4,448 0 4,448 A O C T N O V D E C J A N F E B LI 0530E15101 - Artillery Cartridges, 75MM & 105MM, All ... Army M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #15 - - - - - - - 6,769 A - - - - - - - 4,448 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 434 === page 467 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0530E15101 / Artillery Cartridges, 75MM & 105MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Each) O O C M F R # FY SERVICE Fiscal Year 2028 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Item Number / Title [DODIC]: E22002 / CTG, ARTY, 105MM SMOKE HC M84 W/O FUZE Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND 1 2026 ARMY 6,769 0 6,769 - - - - - - - - - - - - - - - - - 6,769 2 2027 ARMY 4,448 0 4,448 - - - - - - - - - - - - - - - - - - O C T N O V D E C J A N F E B LI 0530E15101 - Artillery Cartridges, 75MM & 105MM, All ... Army M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #15 M A R 0 A P R M A Y J U N J U L A U G - 4,448 S E P Volume 1 - 435 === page 468 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0530E15101 / Artillery Cartridges, 75MM & 105MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Item Number / Title [DODIC]: E22002 / CTG, ARTY, 105MM SMOKE HC M84 W/O FUZE Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND 1 2026 ARMY 6,769 6,769 0 2 2027 ARMY 4,448 0 4,448 0 O C T N O V D E C J A N F E B LI 0530E15101 - Artillery Cartridges, 75MM & 105MM, All ... Army 4,448 M A R 0 A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #15 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 436 === page 469 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0530E15101 / Artillery Cartridges, 75MM & 105MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E22002 / CTG, ARTY, 105MM SMOKE HC M84 W/O FUZE Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 PINE BLUFF ARSENAL PINE BLUFF, AR 2,000 3,500 5,000 6 6 36 42 6 6 36 42 2 TO BE SELECTED - TO BE SELECTED 2,000 3,500 5,000 6 6 36 42 6 6 36 42 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0530E15101 - Artillery Cartridges, 75MM & 105MM, All ... Army UNCLASSIFIED Page 18 of 18 P-1 Line #15 Volume 1 - 437 === page 470 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 37: Artillery Ammunition P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 123 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 5,779.727 5,779.727 5,779.727 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 171.657 216.777 171.657 216.777 171.657 216.777 120.703 - - 120.703 - - 120.703 - 120.703 120.703 120.703 610.423 610.423 610.423 620.715 620.715 620.715 739.780 739.780 739.780 To FY 2031 Complete 730.306 730.306 730.306 Total - 8,990.088 - 8,990.088 - 8,990.088 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: E89500 ARTILLERY PROJECTILE, 155mm ALL TYPES A portion of this budget line is directly aligned to Army Long Range Precision Fire Modernization Priorities. (E27121) - PROJ, ARTY, 155mm HE RAP XM1210 (formerly XM1113 ER) The XM1210 (formerly XM1113 ER) HE, Rocket Assisted Projectile (RAP) will be optimized for Self-Propelled Howitzer (SPH) weapon systems with cannon lengths greater than or equal to 52-caliber and allow commanders to provide accurate cannon artillery fires at ranges of 70km and greater. The XM1210 incorporates Insensitive Munitions (IM) technologies that reduces vulnerability from unplanned stimuli e.g., fire/heat, shock and impact, while maintaining or exceeding the same level of effectiveness in combat. The 155mm XM1210 has a high fragmentation steel (HF1) body projectile filled with 12 pounds of IMX104 Explosive fill, PBXN-9 Supplementary Charge, and Meltable Fuze Plug. Extended ranges are achieved with 12 pounds of rocket grain propellant. The projectile is optimized with the next generation precision course correcting fuze. It is used for conventional fire support for harassment and interdiction, fragmentation and blast effect. The XM1210 projectile is employed against personnel, trucks, electronic surveillance and target acquisition devices, supply points, command and control and communications (C3) installations, and mechanized and armored forces. This item is Code B, not approved for service use. (E21618) PROJ, ARTY, 155mm Extended Range Spotting, M1121 The 155mm Extended Range Spotting M1121 round utilizes projectile bodies generated from the ongoing M483 Dual-Purpose Improved Conventional Munition (DPICM) demilitarization program. It incorporates a more producible white phosphorus (WP) bulk-filled canister with 11.0 lbs. of WP, providing smoke spotting capability up to 22.5 kilometers and enhancing operational effectiveness and training. This item is Code A, approved for service use. (E26900) PROJ, ARTY, 155mm VL ILLUM M1124 The 155mm M1124 Visual Light (VL) Illumination Projectile is fired from 155mm howitzers and is used to illuminate the battlefield to a maximum range of 22.5 kilometers. The M1124 utilizes projectile bodies and bases generated from an on-going M483A1 Dual Purpose Improved Conventional Munition (DPICM) demilitarization program and leverages the payload configuration contained in the 155mm M485A2 VL Illuminating Projectile. The M1124 contains a Canister Loading Assembly, Expulsion Charge, and numerous spacers. The Canister Loading Assembly consists of a VL Illuminating Candle, Main Parachute, Drogue Parachute, Delay, and Secondary Expulsion Charge. The outer shell of the canister is fitted with three longitudinal fins. The projectile uses an M762 series Electronic Time Fuze. When the fuze functions, the primary expelling charge ignites, forcing the drogue parachute and canister assembly against the base plate, rupturing the base pins and expelling the canister and parachute. The drogue parachute then deploys and the canister fins extend. The expelling charge also ignites the delay element in the canister nose. The delay element ignites the secondary expelling charge within the canister LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army UNCLASSIFIED Page 1 of 31 P-1 Line #16 Volume 1 - 438 === page 471 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 37: Artillery Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 123 after 6.5 - 9 seconds, igniting the candle and expelling the main parachute. With the main parachute open, the illumination candle descends at 15 feet per second and burns for 75 seconds minimum producing approximately 1,000,000 candlepower. This item is Code A, approved for service use. (E66501) PROJ, ARTY, 155mm HE RAP XM1113 The XM113 High Explosive (HE), Rocket Assisted Projectile (RAP) is an extended range munition for warfare operations with maximum range of 40 kilometers (km) in 39 caliber weapon systems and 60km in 50+ caliber weapon systems. The XM1113 incorporates Insensitive Munitions (IM) technologies that reduces vulnerability from unplanned stimuli e.g., fire/heat, shock and impact, while maintaining or exceeding the same level of effectiveness in combat. The 155mm XM1113 has a high fragmentation steel (HF1) body projectile filled with 12 pounds of IMX104 Explosive fill, PBXN-9 Supplementary Charge, and Meltable Fuze Plug. Extended ranges are achieved with 12 pounds of rocket grain propellant. The projectile can use several different conventional fuzes (impact, mechanical time, electronic time and short intrusion proximity) as well as Precision Guidance Kit (PGK). It is used for conventional fire support for harassment and interdiction, fragmentation and blast effect. The XM1113 projectile is employed against personnel, trucks, electronic surveillance and target acquisition devices, supply points, command and control and communications (C3) installations, and mechanized and armored forces. This item is Code B, not approved for service use. (E66800) PROJ, ARTY, 155mm HE, M795 The M795 High Explosive (HE) Projectile is the round used for both combat operations and training with maximum range of 22.5 kilometers. The M795 consists of two DODIC variants, the DA54 which incorporates Insensitive Munitions (IM) technologies that reduces vulnerability from unplanned stimuli e.g., fire/heat, shock and impact, while maintaining or exceeding the same level of effectiveness in combat; the D529 which utilizes a lower cost TNT explosive fill primarily used for training. The 155mm M795 has a high fragmentation steel (HF1) body projectile filled with 23.8 pounds of explosive fill, and Supplementary Charge. The projectile can use several different fuzes (impact, mechanical time, electronic time and short intrusion proximity). It is used for conventional fire support for harassment and interdiction, fragmentation, and blast effect. The M795 projectile is employed against personnel, trucks, electronic surveillance and target acquisition devices, supply points, command and control and communications (C3) installations, and mechanized and armored forces. This item is Code A, approved for service use. (E67802) PROJ, ARTY, 155mm, HE W/ BASEBLEED M1128 The M1128 Extended Range High Explosive (HE) projectile is intended as a replacement for the M795 projectile as the primary HE round for warfare operations utilizing current 39 caliber weapon systems. The M1128 will have a maximum range of 30km compared to 22.5km with current M795 and incorporate Insensitive Munitions (IM) technologies that reduces vulnerability from unplanned stimuli (e.g., fire/heat, shock and impact), while maintaining or exceeding the same level of effectiveness in combat. The 155mm M1128 consists of a high fragmentation (HF-1) steel body with a streamlined ogive and a base bleed to reduce drag and extend range. The main payload is 20 pounds of IMX-104. The projectile will be compatible with our conventional fuzes (impact, mechanical time, electronic time, proximity) and Precision Guidance Kit. It will be used for conventional fire support for harassment and interdiction, fragmentation, and blast effect. The M1128 can be employed against personnel, trucks, electronic surveillance and target acquisition devices, supply points, command and control and communications (C3) installations, and mechanized and armored forces. This item is Code B and not approved for service use. (E68604) PROJ, ARTY, 155mm C-DAEM INCREMENT II The Cannon-Delivered Area Effects Munitions (C-DAEM) Dual Purpose Improved Conventional Munition (DPICM) Replacement (formerly known as C-DAEM Increment II) is one of two 155mm projectiles identified to replace the current Department of War (DoW) unexploded ordnance (UXO) policy non-compliant stockpile of 155mm DPICM projectiles. It is a 155mm 39 caliber area effects cargo carrying projectile with maximum range of approximately 18km and will provide U.S. ground forces with a capability to effectively engage area (personnel/soft skinned) targets while denying threat forces full operational freedom within the operational area. C-DAEM DPICM Replacement enables multi-domain operations (MDO) in the Penetration, Dis-integration, and Exploitation phases by providing the combatant commander an additional option of ammunition for field artillery fires. C-DAEM DPICM Replacement is also a key mitigating capability for five Extremely High-Risk Capability Needs Analysis (CNA) Gaps. This item is Code B, not approved for service use. LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army UNCLASSIFIED Page 2 of 31 P-1 Line #16 Volume 1 - 439 === page 472 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 37: Artillery Ammunition P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 123 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD P-5 E21618 / PROJ, ARTY, 155mm Extended Range Spotting, M1121 [DA66] A P-5 E26900 / PROJ, 155mm ARTY VL ILLUM, M485 / M1124 Series [DA57] A P-5 E27121 / PROJ, 155MM ARTY HE RAP, M1210 [DZ19] P-5a B P-5 E66501 / PROJ, 155mm ARTY HE RAP, XM1113 [DA72] P-5a B P-5 E66800 / PROJ, 155mm ARTY HE, M795 [D529] P-5a A P-5 E67802 / PROJ, 155mm ARTY HE-BB, XM1128 [DA70] P-5a, P-21 B P-5 E68604 / PROJ, ARTY, 155MM C-DAEM INCREMENT II P-5a, P-21 B P-40 Total Gross/Weapon System Cost MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 36.753 - - / - - / 0.002 - / - - / - - / - / 347.312 - / 0.264 - / - - / - - / - - / - / - - / 3.554 - / - - / - - / - - / - / 189.240 - / 23.363 / 72.343 - / - - / - - / - - / 3,607.882 - / 53.973 / - - / - - / - - - / 1,224.778 - / 68.275 / 109.241 - / - - - - / 94.896 - - / / 109.241 / 373.762 - / 22.228 - / 49.536 - / 11.462 - / - - / 11.462 / 5,779.727 - / 171.657 - / 216.777 - / 120.703 - / - - / 120.703 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Base Budget supports critical Army Title 10 war reserve/operational, training, and test requirements IAW DoD Instruction 3000.04 (Munitions Requirements Process) and AR 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War (OSW) approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Re-serve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. FY 2027 Total Base dollars in the amount of $120.703 million supports procurement of 23,209 rounds. (E21618) PROJ, ARTY, 155mm Extended Range Spotting, M1121 This is a war reserve item used in combat. There is no FY 2027 budget request for this funding line. TYPE CLASSIFICATION DATE: 2017 (E26900) PROJ, ARTY, 155mm VL ILLUM, M485 / M1124 This is a training standard item used in training and combat. The request supports annual training and builds a war reserve inventory level in accordance with Army's procurement goals. There is no FY 2027 budget request for this funding line. TYPE CLASSIFICATION DATE: 1970 (E27121) PROJ, 155mm ARTY HE RAP, M1210 This is a training standard item used in training and combat. The request supports annual training and builds a war reserve inventory level in accordance with Army's procurement goals. There is no FY 2027 budget request for this funding line. TYPE CLASSIFICATION DATE: Planned FY 2026 LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army UNCLASSIFIED Page 3 of 31 P-1 Line #16 Volume 1 - 440 === page 473 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 37: Artillery Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 123 (E66501) PROJ, ARTY, 155mm HE RAP XM1113 This is a war reserve item used in combat. There is no FY 2027 budget request for this funding line. TYPE CLASSIFICATION: Planned FY 2028 (E66800) PROJ, ARTY, 155mm HE, M795 This item is a training standard item used in training and combat. The request supports annual training and builds a war reserve inventory level in accordance with Army's procurement goals. There is no FY 2027 budget request for this funding line. TYPE CLASSIFICATION DATE: 1982 (E67802) PROJ, ARTY, 155mm, HE W/ BASEBLED M1128 This is a war reserve item used in combat. The FY 2027 request builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Total Base dollars in the amount of $109.241 million supports the procurement of 22,649 rounds. TYPE CLASSIFICATION DATE: 2023 (E68604) PROJ, ARTY, 155mm C-DAEM INCREMENT II This is a war reserve item used in combat. The FY 2027 request directly supports the Army's requirement to fulfill the Office of Secretary of War (OSW) directive to replace Dual Purpose Improved Conventional Munition (DPICM) stockpile. FY 2027 Total Base dollars in the amount of $11.462 million supports the procurement of 560 C-DAEM DPICM Replacement projectiles. TYPE CLASSIFICATION DATE: 2025 LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army UNCLASSIFIED Page 4 of 31 P-1 Line #16 Volume 1 - 441 === page 474 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E21618 / PROJ, ARTY, 155mm Extended Range Spotting, M1121 [DA66] MDAP/MAIS Code: Resource Summary Prior Years FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - - Gross/Weapon System Cost ($ in Millions) 36.753 - 0.002 - - - Less PY Advance Procurement ($ in Millions) - - - - - - 36.753 - 0.002 - - - - - - - - - 36.753 - 0.002 - - - Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost *WOODEN PALLET, IMX 141.07 648 0.091 - - - - - - - - - - - - - - - LOAD, ASSEMBLE, PACK (LAP) 510.16 13,983 7.134 - - - - - - - - - - - - - - - MELTABLE FUZE PLUG 8.00 14,263 0.114 - - - - - - - - - - - - - - - CANNISTER METAL PART SET 650.39 14,263 9.276 - - - - - - - - - - - - - - - MODIFIED SUPPLEMENTAL CHARGE, PBXN9 59.50 14,263 0.849 - - - - - - - - - - - - - - - WOODEN PALLET, IMX 139.28 1,170 0.163 - - - - - - - - - - - - - - - MODIFIED PROJECTILE BODY 230.44 14,263 3.287 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 20.914 - - - - - - - - - - - - - - - - - 20.914 - - - - - - - - - - - - - - - Acceptance Test - - 2.300 - - - - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 2.300 - - - - - - - - - - - - - - - Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Production Engineering Cost LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army UNCLASSIFIED Page 5 of 31 P-1 Line #16 Volume 1 - 442 === page 475 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E21618 / PROJ, ARTY, 155mm Extended Range Spotting, M1121 [DA66] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Production Engineering - - 13.539 - - - - - 0.002 - - - - - - - - - Subtotal: Support Production Engineering Cost - - 13.539 - - - - - 0.002 - - - - - - - - - Gross/Weapon System Cost - - 36.753 - - - - - 0.002 - - - - - - - - - LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army UNCLASSIFIED Page 6 of 31 P-1 Line #16 Volume 1 - 443 === page 476 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E26900 / PROJ, 155mm ARTY VL ILLUM, M485 / M1124 Series [DA57] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC FY 2027 Total - FY 2026 - - - - 0.264 - - - - - - - - - 0.264 - - - - - - - - - 0.264 - - - - - Gross/Weapon System Cost ($ in Millions) 347.312 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 347.312 Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) 347.312 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost *WOODEN PALLET, IMX 141.07 956 0.135 - - - - - - - - - - - - - - - LOAD, ASSEMBLE, PACK (LAP) 350.23 35,723 12.511 - - - - - - - - - - - - - - - DELAY ELEMENT, 155mm ILLUM 82.81 36,437 3.017 - - - - - - - - - - - - - - - M10 EXPULSION CHARGE ASSEMBLY 24.45 36,437 0.891 - - - - - - - - - - - - - - - PARACHUTE MAIN, 155mm ILLUM 40.17 36,437 1.464 - - - - - - - - - - - - - - - PARACHUTE MAIN SUPPORTS, 155mm ILUM 6.11 145,750 0.890 - - - - - - - - - - - - - - - PARACHUTE DROGUE ASSEMBLY, 155mm ILLUM 17.80 36,437 0.648 - - - - - - - - - - - - - - - VL ILLUM CANNISTER 383.30 36,437 13.966 - - - - - - - - - - - - - - - CANISTER MPTS ASSY, 155mm ILLUM 66.28 36,437 2.415 - - - - - - - - - - - - - - - CANISTER BASE ASSY, 155mm ILLUM 24.45 36,437 0.891 - - - - - - - - - - - - - - - LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army UNCLASSIFIED Page 7 of 31 P-1 Line #16 Volume 1 - 444 === page 477 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E26900 / PROJ, 155mm ARTY VL ILLUM, M485 / M1124 Series [DA57] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) METAL PARTS SETS 331.19 36,156 11.975 - - - - - - - - - - - - - - - DOWNLOAD, CLEAN AND INSPECT 95.18 37,381 3.558 - - - - - - - - - - - - - - - WOODEN PALLET, IMX 119.22 3,688 0.440 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 52.801 - - - - - - - - - - - - - - - - - 52.801 - - - - - - - - - - - - - - - First Article Test - - 0.010 - - - - - - - - - - - - - - - Acceptance Test - - 1.138 - - - - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 1.148 - - - - - - - - - - - - - - - - - -0.135 - - - - - - - - - - - - - - - - - -0.135 - - - - - - - - - - - - - - - - - 0.389 - - - - - - - - - - - - - - - - - 0.389 - - - - - - - - - - - - - - - Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Government Furnished Materials Cost Government Furnished Materials Subtotal: Support Government Furnished Materials Cost Support - Product Improvement Cost Reliability Subtotal: Support - Product Improvement Cost Support - Production Engineering Cost Production Engineering - - 293.109 - - 0.264 - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - 293.109 - - 0.264 - - - - - - - - - - - - Gross/Weapon System Cost - - 347.312 - - 0.264 - - - - - - - - - - - - LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army UNCLASSIFIED Page 8 of 31 P-1 Line #16 Volume 1 - 445 === page 478 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E27121 / PROJ, 155MM ARTY HE RAP, M1210 [DZ19] MDAP/MAIS Code: FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - - Gross/Weapon System Cost ($ in Millions) - 3.554 - - - - Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 3.554 - - - - Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 3.554 - - - - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) - - - Subtotal: Recurring Cost - - - - - - Acceptance Test - - Subtotal: Support Acceptance Testing Cost - ROUND Subtotal: Hardware Cost 12,088.63 205 2.478 - - - - - - - - - - - - - - 2.478 - - - - - - - - - - - - - - 2.478 - - - - - - - - - - - - - - - 0.525 - - - - - - - - - - - - - - - - 0.525 - - - - - - - - - - - - Support - Acceptance Testing Cost Support - Production Engineering Cost Production Engineering - - - - - 0.551 - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - - - - 0.551 - - - - - - - - - - - - Gross/Weapon System Cost - - - - - 3.554 - - - - - - - - - - - - Remarks: The M1210 is the new nomenclature for the XM1113ER. (†) indicates the presence of a P-5a LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army UNCLASSIFIED Page 9 of 31 P-1 Line #16 Volume 1 - 446 === page 479 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements COMPLETE ROUND O O C FY Contractor and Location 2025 TO BE SELECTED / TO BE SELECTED LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Method/Type or Funding Vehicle SS / CPFF Location of PCO PICATINNY ARSENAL, NJ UNCLASSIFIED Page 10 of 31 Award Date Date of First Delivery May 2026 May 2027 P-1 Line #16 Item Number / Title [DODIC]: E27121 / PROJ, 155MM ARTY HE RAP, M1210 [DZ19] Qty (Each) 205 Specs Date Unit Cost Avail Revision Now? Available ($) 12,088.63 RFP Issue Date Y Volume 1 - 447 === page 480 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E66501 / PROJ, 155mm ARTY HE RAP, XM1113 [DA72] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC FY 2027 Total - FY 2026 - - - - 23.363 72.343 - - - - - - - - 23.363 72.343 - - - - - - - - 23.363 72.343 - - - - Gross/Weapon System Cost ($ in Millions) 189.240 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 189.240 Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) 189.240 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years FY 2025 Qty Total Cost 16,165 152.698 - - 152.698 - - 152.698 First Article Test - - Acceptance Test - - Subtotal: Support Acceptance Testing Cost - Cost Elements Unit Cost ($) (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE ROUND (†) 9,446.20 Subtotal: Recurring Cost Subtotal: Hardware Cost 9,178.77 2,062 18.927 - - 18.927 - - 18.927 1.251 - - 0.473 - - - 1.724 - - - - 22.701 - - - 22.701 9,371.52 6,958 65.207 - - - - - - - - - - - 65.207 - - - - - - - - - - - 65.207 - - - - - - - - - - - - - - - - - - - - - - 0.403 - - 0.408 - - - - - - - - - 0.403 - - 0.408 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Support - Acceptance Testing Cost Support - Non-Recurring Support Cost Facilitization Subtotal: Support - NonRecurring Support Cost Support - Production Engineering Cost Production Engineering - - 12.117 - - 4.033 - - 6.728 - - - - - - - - - Subtotal: Support Production Engineering Cost - - 12.117 - - 4.033 - - 6.728 - - - - - - - - - Gross/Weapon System Cost - - 189.240 - - 23.363 - - 72.343 - - - - - - - - - LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army UNCLASSIFIED Page 11 of 31 P-1 Line #16 Volume 1 - 448 === page 481 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types ID Code (A=Service Ready, B=Not Service Ready) : B (†) Item Number / Title [DODIC]: E66501 / PROJ, 155mm ARTY HE RAP, XM1113 [DA72] MDAP/MAIS Code: indicates the presence of a P-5a LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army UNCLASSIFIED Page 12 of 31 P-1 Line #16 Volume 1 - 449 === page 482 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Method/Type or Funding Vehicle Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 TO BE SELECTED / TO BE SELECTED C / CPIF PICATINNY ARSENAL, NJ Mar 2026 Mar 2028 2,062 9,178.77 Y 2026 TO BE SELECTED / TO BE SELECTED C / CPIF PICATINNY ARSENAL, NJ Mar 2026 Mar 2028 6,958 9,371.52 Y LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army Location of PCO Award Date Item Number / Title [DODIC]: E66501 / PROJ, 155mm ARTY HE RAP, XM1113 [DA72] UNCLASSIFIED Page 13 of 31 P-1 Line #16 (Each) RFP Issue Date Volume 1 - 450 === page 483 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E66800 / PROJ, 155mm ARTY HE, M795 [D529] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - 53.973 - - - - - - - - - 53.973 - - - - - - - - - 53.973 - - - - - Gross/Weapon System Cost ($ in Millions) 3,607.882 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 3,607.882 Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) 3,607.882 FY 2026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost TNT TYPE I FLAKE (TRINITROTOLUENE) 7.69 12,836,192 98.710 - - - - - - - - - - - - - - - WOODEN PALLETS 124.42 57,439 7.146 - - - - - - - - - - - - - - - 381.58 2,324,556 887.000 484.34 39,383 19.075 - - - - - - - - - - - - 681.09 1,954,296 1,331.055 727.64 40,171 29.230 - - - - - - - - - - - - 20.74 1,907,728 39.557 13.18 40,171 0.529 - - - - - - - - - - - - LOAD, ASSEMBLE, (†) PACK (LAP) 155mm METAL BODY (†) PARTS SUPPLEMENTARY CHARGE PROJECTILE (†) Subtotal: Recurring Cost - - 2,363.468 - - 48.834 - - - - - - - - - - - - - - 2,363.468 - - 48.834 - - - - - - - - - - - - First Article Test - - 13.509 - - - - - - - - - - - - - - - Acceptance Test - - 4.055 - - 0.349 - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 17.564 - - 0.349 - - - - - - - - - - - - Facilitization - - 443.428 - - - - - - - - - - - - - - - Value Engineering - - 0.152 - - - - - - - - - - - - - - - Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Non-Recurring Support Cost LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army UNCLASSIFIED Page 14 of 31 P-1 Line #16 Volume 1 - 451 === page 484 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E66800 / PROJ, 155mm ARTY HE, M795 [D529] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) Subtotal: Support - NonRecurring Support Cost FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 443.580 - - - - - - - - - - - - - - - Production Engineering - - 774.349 - - 4.790 - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - 774.349 - - 4.790 - - - - - - - - - - - - Support - Production Engineering Cost Support - Staging and Transportation Cost Staging and Transportation - - 8.921 - - - - - - - - - - - - - - - Subtotal: Support - Staging and Transportation Cost - - 8.921 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 3,607.882 - - 53.973 - - - - - - - - - - - - (†) indicates the presence of a P-5a LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army UNCLASSIFIED Page 15 of 31 P-1 Line #16 Volume 1 - 452 === page 485 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements LOAD, ASSEMBLE, PACK (LAP) 155mm METAL BODY PARTS SUPPLEMENTARY CHARGE PROJECTILE O O C P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Method/Type or Funding Vehicle Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 AMERICAN ORDNANCE LLC (IAAAP) / MIDDLETOWN, IA C / IDIQ ROCK ISLAND ARSENAL, IL Sep 2025 Sep 2027 39,383 484.34 Y 2025 GENERAL DYNAMICS ORD & TAC SYS / WILKES BARRE, PA C / IDIQ PICATINNY ARSENAL, NJ Mar 2025 Sep 2026 40,171 727.64 Y 2025 SPECTRA TECHNOLOGIES LLC / CAMDEN, AR C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2025 Sep 2026 40,171 13.18 Y LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army Location of PCO Award Date Item Number / Title [DODIC]: E66800 / PROJ, 155mm ARTY HE, M795 [D529] UNCLASSIFIED Page 16 of 31 P-1 Line #16 (Each) RFP Issue Date Volume 1 - 453 === page 486 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E67802 / PROJ, 155mm ARTY HE-BB, XM1128 [DA70] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) 1,224.778 Less PY Advance Procurement ($ in Millions) - - 68.275 94.896 - Net Procurement (P-1) ($ in Millions) 1,224.778 Plus CY Advance Procurement ($ in Millions) - - 68.275 94.896 - Total Obligation Authority ($ in Millions) 1,224.778 - - 68.275 94.896 FY 2027 Base FY 2027 OOC - - 109.241 FY 2027 Total - - - 109.241 - 109.241 - - - 109.241 - 109.241 - - 109.241 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements FY 2025 FY 2026 ($) Qty (Each) Total Cost 2,299.34 180,037 413.967 2,292.34 15,428 35.366 145.69 1,093 0.159 173.05 1,958 0.339 1,123.02 201,042 225.774 1,073.74 17,995 19.322 27.62 4,246,038 117.288 25.95 349,904 8.50 183,916 1.563 9.03 24.52 183,916 4.509 Unit Cost ($ M) Unit Cost ($) Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, (†) PACK (LAP) WOODEN PALLET, IMX (†) METAL PART, (†) M1128 EXPLOSIVE FILL (†) IMX-104 MELTABLE FUZE PLUG (†) SUPPLEMENTAL (†) CHARGE, PBXN9 Subtotal: Recurring Cost 2,292.34 20,841 47.775 22,649 51.919 - - - - - - - - - - 1,073.73 21,883 23.496 1,073.73 23,781 25.534 - - - 9.080 29.57 541,866 16.023 30.14 588,874 17.749 - - 16,896 0.153 15.44 21,257 0.328 15.76 23,101 0.364 - 26.13 16,896 0.441 32.74 21,257 0.696 33.41 23,101 0.772 - 2,292.34 - 2,292.34 22,649 51.919 - - 1,073.73 23,781 25.534 - 30.14 588,874 17.749 - - 15.76 23,101 0.364 - - - 33.41 23,101 0.772 - - - 763.260 - - 64.701 - - 88.318 - - 96.338 - - - - - 96.338 - - 763.260 - - 64.701 - - 88.318 - - 96.338 - - - - - 96.338 First Article Test - - 66.311 - - - - - - - - - - - - - - - Acceptance Test - - 7.923 - - 0.157 - - 0.500 - - 0.500 - - - - - 0.500 Subtotal: Support Acceptance Testing Cost - - 74.234 - - 0.157 - - 0.500 - - 0.500 - - - - - 0.500 Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Non-Recurring Support Cost LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army UNCLASSIFIED Page 17 of 31 P-1 Line #16 Volume 1 - 454 === page 487 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E67802 / PROJ, 155mm ARTY HE-BB, XM1128 [DA70] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) Facilitization Subtotal: Support - NonRecurring Support Cost FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 120.473 - - - - - - - - - - - - - - - - - 120.473 - - - - - - - - - - - - - - - Support - Production Engineering Cost Production Engineering - - 266.811 - - 3.417 - - 6.078 - - 12.402 - - - - - 12.402 Subtotal: Support Production Engineering Cost - - 266.811 - - 3.417 - - 6.078 - - 12.402 - - - - - 12.402 Gross/Weapon System Cost - - 1,224.778 - - 68.275 - - 94.896 - - 109.241 - - - - - 109.241 Remarks: Increase in Production Engineering Support from FY 2026 to FY2027 is due to increase in delivery quantities. (†) indicates the presence of a P-5a LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army UNCLASSIFIED Page 18 of 31 P-1 Line #16 Volume 1 - 455 === page 488 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 O O C Cost Elements Method/Type or Funding Vehicle Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) Contractor and Location 2025 AMERICAN ORDNANCE LLC (IAAAP) / MIDDLETOWN, IA C / FFP PICATINNY ARSENAL, NJ Dec 2024 Dec 2026 7,714 2,292.34 Y 2025 GEN DYNAMICS ARMNT & TECH PRODUCTS / MCHENRY, MS C / FFP ROCK ISLAND ARSENAL, IL Mar 2025 Mar 2027 7,714 2,292.34 Y 2026 TO BE SELECTED / TO BE SELECTED C / FFP PICATINNY ARSENAL, NJ May 2026 May 2029 20,841 2,292.34 Y 2027 TO BE SELECTED / TO BE SELECTED C / FFP PICATINNY ARSENAL, NJ May 2027 May 2030 22,649 2,292.34 Y 2025 KNOX CNTY ASSOC REMARKABLE / VINCENNES, IN Option / IDIQ ROCK ISLAND ARSENAL, IL Feb 2025 Feb 2026 1,958 173.05 Y 2025 IMT DEFENSE CORP / WESTERVILLE, OH C / FFP ROCK ISLAND ARSENAL, IL Mar 2025 Sep 2026 17,995 1,073.74 Y 2026 TO BE SELECTED / TO BE SELECTED C / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Jun 2027 21,883 1,073.73 Y 2027 TO BE SELECTED / TO BE SELECTED C / FFP ROCK ISLAND ARSENAL, IL Feb 2027 Jun 2028 23,781 1,073.73 Y 2025 BAE SYSTEMS ORDNANCE SYSTEMS / KINGSPORT, TN C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2025 Mar 2026 349,904 25.95 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 541,866 29.57 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 588,874 30.14 Y 2025 IMT DEFENSE CORP / WESTERVILLE, OH C / IDIQ PICATINNY ARSENAL, NJ Feb 2025 Aug 2026 16,896 9.03 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Aug 2027 21,257 15.44 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Feb 2027 Aug 2027 23,101 15.76 Y SUPPLEMENTAL CHARGE, PBXN9 2025 SPECTRA TECHNOLOGIES LLC / CAMDEN, AR C / IDIQ ROCK ISLAND ARSENAL, IL Jun 2025 Dec 2026 16,896 26.13 Y SUPPLEMENTAL CHARGE, PBXN9 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Aug 2027 21,257 32.74 Y SUPPLEMENTAL CHARGE, PBXN9 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Feb 2027 Aug 2027 23,101 33.41 Y LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) METAL PART, M1128 METAL PART, M1128 METAL PART, M1128 EXPLOSIVE FILL IMX-104 EXPLOSIVE FILL IMX-104 EXPLOSIVE FILL IMX-104 MELTABLE FUZE PLUG MELTABLE FUZE PLUG MELTABLE FUZE PLUG Location of PCO Award Date Item Number / Title [DODIC]: E67802 / PROJ, 155mm ARTY HE-BB, XM1128 [DA70] FY WOODEN PALLET, IMX (†) P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types (Each) RFP Issue Date indicates the presence of a P-21 LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army UNCLASSIFIED Page 19 of 31 P-1 Line #16 Volume 1 - 456 === page 489 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E67802 / PROJ, 155mm ARTY HE-BB, XM1128 [DA70] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 180037 2 2025 ARMY 7.714 .000 7.714 3 2025 ARMY 7.714 .000 7.714 1 2026 ARMY 20.841 .000 20.841 1 2027 ARMY 22.649 .000 22.649 A - - - - - - - - - - - - - - - - - - - - - - A - - - - - - - - - - - - - - - - - - - 7.714 7.714 A - - - - - 20.841 22.649 O C T N O V D E C J A N F E B LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 20 of 31 S E P O C T N O V D E C J A N F E B P-1 Line #16 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 457 === page 490 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E67802 / PROJ, 155mm ARTY HE-BB, XM1128 [DA70] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B B A L A N C E Fiscal Year 2028 Calendar Year 2028 M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 180037 2 2025 ARMY 7.714 .000 7.714 - - .642 .642 .642 .642 .642 .642 .642 .642 .642 .642 .642 .652 3 2025 ARMY 7.714 .000 7.714 - - - - - .642 .642 .642 .642 .642 .642 .642 .642 .642 .642 .642 .652 1 2026 ARMY 20.841 .000 20.841 - - - - - - - - - - - - - - - - - 1 2027 ARMY 22.649 .000 22.649 A O C T N O V D E C J A N F E B LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 21 of 31 S E P O C T .000 N O V D E C J A N .000 - F E B P-1 Line #16 - M A R - A P R - M A Y - J U N - J U L A U G - 20.841 - 22.649 S E P Volume 1 - 458 === page 491 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E67802 / PROJ, 155mm ARTY HE-BB, XM1128 [DA70] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 180037 2 2025 ARMY 7.714 7.714 .000 3 2025 ARMY 7.714 7.714 .000 .000 1 2026 ARMY 20.841 .000 20.841 - - - - - - - 1.739 1.739 1.739 1.739 1.739 1.739 1.739 1.739 1.739 1.739 1.739 1.712 1 2027 ARMY 22.649 .000 22.649 - - - - - - - - - - - - - - - - - - - .000 O C T N O V D E C J A N F E B LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 22 of 31 S E P O C T N O V D E C J A N F E B P-1 Line #16 M A R A P R .000 1.887 1.887 1.887 1.887 1.887 13.214 M A Y J U N J U L A U G S E P Volume 1 - 459 === page 492 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2031 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2030 1 OCT Item Number / Title [DODIC]: E67802 / PROJ, 155mm ARTY HE-BB, XM1128 [DA70] Fiscal Year 2032 Calendar Year 2031 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2032 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 180037 2 2025 ARMY 7.714 7.714 .000 .000 3 2025 ARMY 7.714 7.714 .000 .000 1 2026 ARMY 20.841 20.841 .000 1 2027 ARMY 22.649 9.435 13.214 .000 1.887 1.887 1.887 1.887 1.887 1.887 1.892 O C T N O V D E C J A N F E B M A R A P R LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army .000 M A Y J U N J U L A U G UNCLASSIFIED Page 23 of 31 S E P O C T N O V D E C J A N F E B P-1 Line #16 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 460 === page 493 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E67802 / PROJ, 155mm ARTY HE-BB, XM1128 [DA70] Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 TO BE SELECTED - TO BE SELECTED 5,000 5,000 5,000 6 8 36 44 6 8 36 44 2 AMERICAN ORDNANCE LLC (IAAAP) MIDDLETOWN, IA 5,000 5,000 5,000 6 8 36 44 6 8 36 44 3 GEN DYNAMICS ARMNT & TECH PRODUCTS MCHENRY, MS 4,000 10,000 15,000 6 8 30 38 6 8 24 32 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army UNCLASSIFIED Page 24 of 31 P-1 Line #16 Volume 1 - 461 === page 494 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E68604 / PROJ, ARTY, 155MM C-DAEM INCREMENT II MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 22.228 49.536 11.462 - 11.462 - Gross/Weapon System Cost ($ in Millions) 373.762 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 373.762 Plus CY Advance Procurement ($ in Millions) - - - - - 22.228 49.536 11.462 - 11.462 - Total Obligation Authority ($ in Millions) 373.762 FY 2027 Total - - - - - 22.228 49.536 11.462 - 11.462 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE 7,603 135.858 - - 135.858 - - 135.858 First Article Test - - Acceptance Test - - Subtotal: Support Acceptance Testing Cost - Technical Publications Subtotal: Support - Data Cost ROUND (†) 17,869.00 Subtotal: Recurring Cost Subtotal: Hardware Cost 17,860.70 1,065 19.022 - - 19.022 - - 19.022 2.425 - - 3.035 - - - 5.460 - - - - 83.416 - - - 83.416 - - - - 20,000.00 2,400 48.000 - - 48.000 - - 48.000 - - - 0.594 - - 0.594 - - - - - - - - 5.000 - - 5.000 - - 17,860.70 560 10.002 - - - - - 10.002 - - - - - 10.002 - - - - - - - - - 0.103 - - 0.110 - - 0.103 - - 0.110 - - - - - - - - - - - - - - - - - - - - - 17,860.70 560 10.002 - - 10.002 - - 10.002 - - - - - - - 0.110 - - - - 0.110 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Support - Acceptance Testing Cost Support - Data Cost Support - Engineering Change Proposals Cost Engineering Change Proposals Subtotal: Support Engineering Change Proposals Cost Support - Industrial Facilities Cost LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army UNCLASSIFIED Page 25 of 31 P-1 Line #16 Volume 1 - 462 === page 495 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E68604 / PROJ, ARTY, 155MM C-DAEM INCREMENT II MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Equipment Acquisition or Modernization - - 108.810 - - - - - - - - - - - - - - - Subtotal: Support - Industrial Facilities Cost - - 108.810 - - - - - - - - - - - - - - - Production Verification Test - - 25.507 - - 0.594 - - - - - - - - - - - - Subtotal: Support - Product Improvement Cost - - 25.507 - - 0.594 - - - - - - - - - - - - Production Engineering - - 7.833 - - 1.556 - - 1.433 - - 1.350 - - - - - 1.350 Subtotal: Support Production Engineering Cost - - 7.833 - - 1.556 - - 1.433 - - 1.350 - - - - - 1.350 - - 0.082 - - - - - - - - - - - - - - - - - 0.082 - - - - - - - - - - - - - - - Support - Product Improvement Cost Support - Production Engineering Cost Support - Program Management Cost Government Management Subtotal: Support - Program Management Cost Support - System Engineering Cost System Engineering - - 1.796 - - 0.462 - - - - - - - - - - - - Subtotal: Support - System Engineering Cost - - 1.796 - - 0.462 - - - - - - - - - - - - Gross/Weapon System Cost - - 373.762 - - 22.228 - - 49.536 - - 11.462 - - - - - 11.462 Remarks: Initial production contract awarded in September 2025. Pricing for each year will be based on a linear pricing curve with decreasing prices for higher quantities. It is a sliding scale with lower unit costs as quantities increase and higher unit costs as quantities decrease. In FY 2026, program received a $10.000M Congressional Add. (†) indicates the presence of a P-5a LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army UNCLASSIFIED Page 26 of 31 P-1 Line #16 Volume 1 - 463 === page 496 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types FY Contractor and Location Method/Type or Funding Vehicle 2025 TOMER / TEL AVIV- JAFFA, ISRAEL C / IDIQ PICATINNY ARSENAL, NJ Sep 2025 Sep 2027 1,065 17,860.70 Y 2026 TOMER / TEL AVIV- JAFFA, ISRAEL Option / IDIQ PICATINNY ARSENAL, NJ May 2026 May 2028 2,400 20,000.00 Y 2027 TOMER / TEL AVIV- JAFFA, ISRAEL Option / IDIQ PICATINNY ARSENAL, NJ May 2027 May 2029 560 17,860.70 Y Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: E68604 / PROJ, ARTY, 155MM C-DAEM INCREMENT II Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date indicates the presence of a P-21 Remarks: Contract Awarded 30SEP25 Tomer 5748A LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army UNCLASSIFIED Page 27 of 31 P-1 Line #16 Volume 1 - 464 === page 497 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Each) O O C M F R # FY SERVICE Item Number / Title [DODIC]: E68604 / PROJ, ARTY, 155MM C-DAEM INCREMENT II Fiscal Year 2025 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 7603 1 2025 ARMY 1,065 0 1,065 A - - - - - - - - - - - - - 1,065 1 2025 MC (‡) 1,332 0 1,332 A - - - - - - - - - - - - - 1,332 1 2025 Total 2,397 0 2,397 - - - - - - - - - - - - - 2,397 1 2026 ARMY 2,400 0 2,400 A - - - - - 2,400 1 2026 MC (‡) 2,842 0 2,842 A - - - - - 2,842 1 2026 Total 5,242 0 5,242 - - - - - 5,242 1 2027 ARMY 560 0 560 560 1 2027 MC (‡) 5,665 0 5,665 5,665 1 2027 Total 6,225 0 6,225 6,225 O C T N O V D E C J A N F E B LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 28 of 31 S E P O C T N O V D E C J A N F E B P-1 Line #16 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 465 === page 498 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Each) O O C M F R # FY SERVICE Item Number / Title [DODIC]: E68604 / PROJ, ARTY, 155MM C-DAEM INCREMENT II Fiscal Year 2027 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 7603 1 2025 ARMY 1,065 0 1,065 - - - - - - - - - - - 1,065 1 2025 MC (‡) 1,332 0 1,332 - - - - - - - - - - - 1,332 1 2025 Total 2,397 0 2,397 - - - - - - - - - - - 2,397 - - - - - - - - - - - - 1 2026 ARMY 2,400 0 2,400 - - - - - - - - - - - - - - - - - - - 200 200 200 200 200 1,400 1 2026 MC (‡) 2,842 0 2,842 - - - - - - - - - - - - - - - - - - - 238 237 237 237 237 1,656 1 2026 Total 5,242 0 5,242 - - - - - - - - - - - - - - - - - - - 438 437 437 437 437 3,056 1 2027 ARMY 560 0 560 A - - - - - - - - - - - - - - - - - 560 1 2027 MC (‡) 5,665 0 5,665 A - - - - - - - - - - - - - - - - - 5,665 1 2027 Total 6,225 0 6,225 - 6,225 O C T N O V D E C J A N F E B LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 29 of 31 0 0 S E P O C T N O V D E C J A N F E B P-1 Line #16 M A R A P R M A Y J U N J U L A U G 0 S E P Volume 1 - 466 === page 499 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E68604 / PROJ, ARTY, 155MM C-DAEM INCREMENT II Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 7603 1 2025 ARMY 1,065 1,065 0 1 2025 MC (‡) 1,332 1,332 0 1 2025 Total 2,397 2,397 0 1 2026 ARMY 2,400 1,000 1 2026 MC (‡) 2,842 1 2026 Total 1 2027 1 2027 MC 1 2027 0 0 - - - - - - - 1,400 200 200 200 200 200 200 200 1,186 1,656 237 237 237 237 237 237 234 5,242 2,186 3,056 437 437 437 437 437 437 434 - - - - - ARMY 560 0 560 - - - - - - - 560 - - - - (‡) 5,665 0 5,665 - - - - - - - 2,224 1,000 1,000 1,000 441 Total 6,225 0 6,225 - - - - - - - 2,784 1,000 1,000 1,000 441 M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army M A R A P R - - - - - - - - - - - - - - - - - 0 0 0 UNCLASSIFIED Page 30 of 31 - - - - - - - - - - - - 0 0 0 O C T N O V D E C J A N F E B P-1 Line #16 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 467 0 === page 500 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3102E89500 / ARTILLERY PROJECTILE, 155MM, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E68604 / PROJ, ARTY, 155MM C-DAEM INCREMENT II Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 TOMER - TEL AVIV- JAFFA, ISRAEL MSR For 2027 1-8-5 For 2027 MAX For 2027 1,000 5,000 10,000 ALT Prior to Oct 1 ALT After Oct 1 8 Reorder Manufacturing PLT 8 24 Total After Oct 1 ALT Prior to Oct 1 32 ALT After Oct 1 8 Manufacturing PLT 8 Total After Oct 1 24 32 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 3102E89500 - ARTILLERY PROJECTILE, 155MM, All Types Army UNCLASSIFIED Page 31 of 31 P-1 Line #16 Volume 1 - 468 === page 501 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 37: Artillery Ammunition P-1 Line Item Number / Title: 6635F90100 / PRECISION ARTILLERY MUNITIONS Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 854 706.905 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 706.905 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 706.905 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 854 37.318 21.095 - - - - - - - - 765.318 - - - - - - - - - - 37.318 21.095 - - - - - - - - - - - - - - - - - - 37.318 21.095 - - - - - - - - Total 765.318 765.318 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 827.758 896.157 Description: The Precision Artillery Munitions funding lines support programs of interest aligned to the Army's Cannon Transformation Strategy. This budget line includes the Excalibur and Cannon-Delivered Area Effects Munitions (C-DAEM) Armor munitions. (F90111) Excalibur is a Precision Guided Extended Range 155mm Artillery projectile providing Brigade Combat Teams an organic precision fires capability. Excalibur is currently fielded and in use. Excalibur is an International Cooperative Development program, teamed with the Kingdom of Sweden (KoS), which contributed resources towards the development in accordance with an established Project Agreement. Excalibur provides improved fire support capability due to its increased range of 40.5 kilometers from the current 39 caliber systems (M777A2 Lightweight 155mm Howitzer (LW155), the M109A6 Paladin Howitzer, the M109A7 Paladin Integrated Management Howitzer and the Swedish Archer Howitzer) and demonstrated 70 kilometers from the 58-caliber XM1299 Extended Range Cannon Artillery (ERCA) Self Propelled Howitzer (SPH). The projectile has a demonstrated accuracy of less than 2 meters radial miss distances, which enables a first-round effect on target reducing the number of rounds required while reducing collateral damage. Excalibur Shaped Trajectory configuration enables user defined angle of attack and angle of fall to maximize effect on target. Excalibur is resistant to Global Positioning System (GPS) jamming. Due to its mature compartmented design configuration, Excalibur has significant upgrade potential and provides growth opportunities to support the Army's Cannon Transformation Strategy range and lethality requirements. This item is Code A, approved for service use. (F90112) Cannon-Delivered Area Effects Munitions (C-DAEM) Armor is one of two 155mm projectiles identified to replace the current Department of Defense (DoD) unexploded ordnance (UXO) policy noncompliant stockpile of 155mm Dual Purpose Improved Conventional Munition (DPICM) projectiles. It is a 155mm cannon munition designed to address the cannon artillery area targets, from light to heavy armor, whether precisely or imprecisely located, moving or moved. C-DAEM Armor will provide U.S. ground forces with a capability to effectively engage, destroy, neutralize, and/or suppress threat formations. The projectile provides a hit-to-kill capability, enabling it to effectively engage area and point armored/mechanized targets at extended ranges. The projectile also includes a seeker, shape charged warhead, and Military Code (M-Code) GPS to provide an anti-armor capability out to 70km and beyond while maintaining compatibility with the existing inventory of 155mm platforms. This program has a long-term strategy for integrating increased capability, such as a datalink for round-to-round communications and inflight targeting updates and increased range. This item is Code B, not approved for service use. LI 6635F90100 - PRECISION ARTILLERY MUNITIONS Army UNCLASSIFIED Page 1 of 2 P-1 Line #17 Volume 1 - 469 === page 502 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 37: Artillery Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 6635F90100 / PRECISION ARTILLERY MUNITIONS Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Justification: (F90111) Projectile 155mm Extended Range M982 Excalibur This is a war reserve item used in combat. This program does not have a FY 2027 budget request. TYPE CLASSIFICATION DATE: May 2014 (F90112) PROJ, ARTY, 155mm C-DAEM ARMOR This is a war reserve item used in combat. This program does not have a FY 2027 budget request. TYPE CLASSIFICATION DATE: Planned FY 2030 Efforts resourced within this Budget Line Item support critical Army Title 10 war reserve/operational, training, and test requirements in accordance with Department of Defense Instruction 3000.04 (Munitions Requirements Process) and Army Regulation 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War (OSW) approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 6635F90100 - PRECISION ARTILLERY MUNITIONS Army UNCLASSIFIED Page 2 of 2 P-1 Line #17 Volume 1 - 470 === page 503 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 37: Artillery Ammunition P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 7,923.619 7,923.619 7,923.619 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 573.947 573.947 573.947 168.737 431.328 168.737 - - 431.328 168.737 - - - 431.328 - 431.328 431.328 431.328 414.830 414.830 414.830 412.330 412.330 412.330 311.664 311.664 311.664 To FY 2031 Complete 336.921 336.921 336.921 Total - 10,573.376 - 10,573.376 - 10,573.376 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: (E27501) Artillery Propellants, Fuzes and Primers, All Types. A portion of this funding line is directly aligned to the Army's Cannon Transformation Strategy. (E27319) M119 RED BAG PROPELLING CHARGE The M119 Propelling Charge is a "High Zone" red bag charge for firing in 155mm Howitzers containing M185 and M199 cannon tubes. It is a single increment charge and contains 20.9 pounds of M6 propellant, lead foil, flash reducer and a base igniter pad comprised of Clean Burning Ignitor (CBI) powder and a center spot of black powder. It is designed to achieve ranges from 10 to 18 kilometers. This item is Code A, approved for service use. (E27502) ARTY, 155mm PROP CHG, MACS M231 SERIES The Modular Artillery Charge System (MACS), M231 "Low Zone" is intended for use with all US 155mm cannon field artillery systems in use and development. The M231 is a "low-zone" increment designed to achieve ranges from 3 to 12 kilometers. Each MACS increment includes propellant, an ignition system, and a combustible case. Packaging permits long-term storage and helps protect the items from unplanned stimuli. This item is Code A, approved for service use. (E27513) 155mm EXTENDED RANGE MODULAR CHARGE The Extended Range Modular Charge (ERMC) "High Zone" is intended for use with all current and future United States 155mm cannon field artillery systems. The ERMC "High Zone" increment is optimized to achieve extended ranges from the longer 52-caliber howitzers to 50+ kilometers. Each increment includes novel high-energy propellant, an ignition system, a combustible case and performance enhancing additives. Packaging permits long-term storage and helps protect the items from unplanned stimuli. (E27514) 155mm EXTENDED RANGE PRIMER The Extended Range Primer (ERP) is intended for use with all current and future United States 155mm cannon field artillery systems. The ERP is a Percussion Primer that is used to initiate the burning of propellant charges including bag charges, modular charges, and supercharges. The ERP will be improved to survive higher forces associated with modern propellants and mechanical feed mechanisms. The ERP consists of a cylindrical brass case with an extraction flange, which contains an internal plunger, an ignition element, and a container loaded with energetics. LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 1 of 53 P-1 Line #18 Volume 1 - 471 === page 504 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 37: Artillery Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A (E62208) ARTY, FUZE PD M739A1 The M739A1 Point Detonating (PD) and Delay Fuze is the Army's preferred, primary fuze for 105mm and 155mm projectiles to address point detonating/delay artillery functions. The M739A1 fuze contains an Impact Delay Module (IDM) assembly. The IDM provides fuze initiation delay based upon the completion of mechanical actions caused by projectile deceleration and will function immediately after passing through the target. This item is Code A, approved for service use. (E63000), PRIMER, 155mm ARTY PERCUSSION, M82 SERIES The M82 Percussion Primer is intended for use with all United States 155mm cannon field artillery systems. The M82 Series Percussion Primer is used to initiate the burning of propellant charges and consists of a cylindrical brass case with an extraction flange, which contains a base plunger, an ignition element which contains Primer #34 and a container loaded with 22 grains of black powder. This item is Code A, approved for service use. (E99200) FUZE, 155mm ARTY ELECTRIC TIME (ET), M762 SERIES The M762A1 Electronic Time (ET) Fuze is used with the 105mm and 155mm cargo carrying artillery projectiles. The M762A1 retains the existing dual setting capability: (1) Handset without need for any tool, and (2) remote inductive setting for higher rates of fire. In addition to the US requirements, the fuze complies with NATO Rationalization, Standardization and Interoperability (RSI) agreements for artillery weapon systems. This item is code A, approved for service use. (E99250) ARTY, FUZE, PRECISION GUIDANCE KIT (PGK) The Precision Guidance Kit (PGK) is a course correcting fuze that provides precision accuracy and efficiency for 155mm M795, M549A1, and M1128 High Explosive (HE) projectiles by eliminating a portion of the inherent errors associated with ballistic firing solutions which effectively reduces the number of projectiles required to execute fire missions. PGK utilizes a Global Positioning System (GPS) receiver and internal Guidance and Navigation Computer to accomplish its mission with point detonating and proximity fuzing functions. PGK is compatible with the M777A2 Lightweight 155mm Howitzer (LW155), the M109A6 Paladin Howitzer, and the M109A7 Paladin PIM Howitzer. The PGK M1156A1 adds XM1113 compatibility and is Military Code (M-Code) capable. M1156A1 has been qualified for use by Foreign Military Sales (FMS) customers in 52 caliber weapon systems. The M1156E5, to become M1156A2 post Type Classification (TC), will include anti-jam (AJ) capability in a degraded GPS environment. PGK supports the Army's Cannon Transformation Strategy and future 155mm projectiles. This item is Code A, approved for service use. (E99909) ARTY, FUZE MOFA M782 SERIES The Multi-Option Fuze for Artillery (MOFA) is compatible with all bursting ammunition fired from all 105mm and 155mm cannon systems including M119, M109, and M777 series firing platforms and cannon assemblies. The MOFA provides proximity, precision time, delay and impact functions in a single fuze. The inductive fuze set feature optimizes MOFA for use with automated ammunition handling equipment. The MOFA combines proven subassemblies such as the safe and arm device with reserve batteries and a proximity sensor technology to affordably achieve enhanced performance, predictability, and safety. This item is Code A, approved for service use. (ER8021) ARTY, 155mm PROP CHG, MACS M232 SERIES The Modular Artillery Charge System (MACS) M232 "High Zone" is intended for use with all United States 155mm cannon field artillery systems. The M232 "High Zone" increment is designed to achieve ranges from 10 to 40 kilometers. Each MACS increment includes propellant, an ignition system, and a combustible case. Performance enhancing additives are included in the M232 "High Zone" increment. Packaging permits long-term storage and helps protect the items from unplanned stimuli. This item is Code A, approved for service use. LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 2 of 53 P-1 Line #18 Volume 1 - 472 === page 505 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 37: Artillery Ammunition P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 E27319 / M119 RED BAG PROPELLING CHARGE P-5a P-5 E27502 / PROP CHG, 155mm ARTY MACS, M231 Series [DA12] P-5a, P-21 P-5 E27513 / 155MM EXTENDED RANGE MODULAR CHARGE - / - - / - P-5 E27514 / 155MM EXTENDED RANGE PRIMER - / - - / - P-5 E62208 / FUZE,155mm ARTY Point Detonating (PD), M739 Series [N340] P-5a, P-21 A - / 584.600 - / 32.853 P-5 E63000 / PRIMER,155mm ARTY Percussion, M82 Series [N523] P-5a A - / 102.571 - / 13.113 P-5 E99200 / ARTY, FUZE, ELECTRONIC TIME, M762A1 P-5a A - / 166.266 - / 49.356 P-5 E99250 / FUZE,155mm ARTY Precision Guidance Kit (PGK) [NA37] P-5a, P-21 A / 1,306.789 - P-5 E99909 / Multi-Option Fuze, Artillery M782 [NA09] P-5a, P-21 A P-5 ER8021 / PROP CHG, 155mm ARTY MACS, M232 Series [DA67] P-5a, P-21 A P-40 Total Gross/Weapon System Cost A / 1,568.330 - / 198.968 / 380.971 - / 45.745 - - - / - - / - - / - / 116.689 - / - - - / 52.842 - / - - / 52.842 - / 2.516 - / - - / 2.516 - / 37.434 - - / - - / / 8.761 - - - / 8.990 - / - / - - / - - / - - - / 19.910 - / - - / - - / 61.419 - / 39.653 / 63.105 - / - - - / / 116.689 - / 8.990 / / / 63.105 / 174.096 - / 19.088 - / 32.137 - / 27.000 - / - - / 27.000 - / 3,639.996 - / 153.405 - / 30.842 - / 160.186 - / - - / 160.186 - / 7,923.619 - / 573.947 - / 168.737 - / 431.328 - / - - / 431.328 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Base Budget supports critical Army Title 10 war reserve/operational, training, and test requirements in accordance with Department of Defense Instruction 3000.04 (Munitions Requirements Process) and Army Regulation 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War (OSW) approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. FY 2027 Total Base dollars in the amount of $431.328 million supports the procurement of 62,777 fuzes, 53,000 primers and 699,183 propelling charges. (E27319) M119 RED BAG PROPELLING CHARGE This is a training standard item used in training and combat. There is no FY 2027 budget request for this item. (E27502) ARTY, 155MM PROP CHG, MACS M231 Series This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Total Base dollars in the amount of $116.689 million supports the procurement of 218,477 charges. TYPE CLASSIFICATION DATE: 1999 (E27513) 155MM EXTENDED RANGE MODULAR CHARGE This is a training standard item used in training and combat. FY 2027 request supports operational assessment for mobile tactical cannon, annual training and builds a war reserve inventory in accordance with LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 3 of 53 P-1 Line #18 Volume 1 - 473 === page 506 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 37: Artillery Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A the Army's procurement goals. FY 2027 Total Base dollars in the amount of $52.842 million supports production of 109,000 charges. This program is a new start in FY 2027 (E27514) 155MM EXTENDED RANGE PRIMER This is a training standard item used in training and combat. FY 2027 request supports operational assessment for mobile tactical cannon, annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Total Base dollars in the amount of $2.516 million supports production of 53,000 Primers. This program is a new start in FY 2027 (E62208) ARTY, FUZE PD M739 Series This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Total Base dollars in the amount of $8.990 million supports production of 54,950 fuzes. TYPE CLASSIFICATION: 1982 (E63000), PRIMER, 155MM ARTY PERCUSSION, M82 SERIES This is a training standard item used in training and combat. There is no FY 2027 budget request for this item (E99200) FUZE, 155MM ARTY ELECTRIC TIME (ET), M762 SERIES This is a training standard item used in training and combat. There is no FY 2027 budget request for this item TYPE CLASSIFICATION DATE: 1988 (E99250) ARTY, FUZE, PRECISION GUIDANCE KIT (PGK) This is a critical munition and war reserve item used in both training and combat. FY 2027 request builds a war reserve inventory and supports annual training in accordance with Army's procurement goals. FY 2027 Total Base dollars in the amount of $63.105 million supports the production of 1,009 Precision Guidance Kits that have anti-jam capability in a Global Positioning System (GPS) degraded environment. TYPE CLASSIFICATION DATE: 2015 (E99909) ARTY, FUZE MOFA M782 SERIES This is a training standard item used in training and combat. The FY2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY2027 Total Base dollars in the amount of $27.000 million supports the procurement of 6,818 fuzes. TYPE CLASSIFICATION: 1999 (ER8021) ARTY, 155MM PROP CHG, MACS M232 SERIES This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Total Base dollars in the amount of $160.186 million supports the production of 371,706 charges. TYPE CLASSIFICATION DATE: 2001 LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 4 of 53 P-1 Line #18 Volume 1 - 474 === page 507 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: E27319 / M119 RED BAG PROPELLING CHARGE MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 - Gross/Weapon System Cost ($ in Millions) 1,568.330 Less PY Advance Procurement ($ in Millions) 198.968 - Net Procurement (P-1) ($ in Millions) - 1,568.330 Plus CY Advance Procurement ($ in Millions) 198.968 - Total Obligation Authority ($ in Millions) FY 2026 - - 1,568.330 198.968 FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - - - - - - - - - - - - - - - - - - - - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements FY 2025 ($) Qty (Each) Total Cost 1,825.52 778,327 1,420.852 Unit Cost ($ M) Unit Cost ($) FY 2026 FY 2027 Base 84,344 129.692 - - - - - - - - - - - - (Each) ($ M) ($) Qty (Each) Unit Cost ($ M) ($) Total Cost FY 2027 Total Qty Unit Cost Total Cost FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE ROUND (†) Subtotal: Recurring Cost 1,537.65 - - 1,420.852 - - 129.692 - - - - - - - - - - - - - - 1,420.852 - - 129.692 - - - - - - - - - - - - Acceptance Test - - 30.343 - - 4.312 - - - - - - - - - - - - First Article Test - - 11.276 - - 0.358 - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 41.619 - - 4.670 - - - - - - - - - - - - - - 0.339 - - - - - - - - - - - - - - - - - 0.339 - - - - - - - - - - - - - - - Value Engineering - - 2.390 - - - - - - - - - - - - - - - Facilitization - - 81.236 - - 60.698 - - - - - - - - - - - - - - 83.626 - - 60.698 - - - - - - - - - - - - Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Engineering Change Proposals Cost Engineering Change Proposals Subtotal: Support Engineering Change Proposals Cost Support - Non-Recurring Support Cost Subtotal: Support - NonRecurring Support Cost Support - Production Engineering Cost LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 5 of 53 P-1 Line #18 Volume 1 - 475 === page 508 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: E27319 / M119 RED BAG PROPELLING CHARGE MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Production Engineering - - 21.894 - - 3.908 - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - 21.894 - - 3.908 - - - - - - - - - - - - Gross/Weapon System Cost - - 1,568.330 - - 198.968 - - - - - - - - - - - - (†) indicates the presence of a P-5a LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 6 of 53 P-1 Line #18 Volume 1 - 476 === page 509 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All FY Contractor and Location Method/Type or Funding Vehicle 2025 NAMMO PERRY INC. / PERRY, FL C / IDIQ PICATINNY ARSENAL, NJ Sep 2025 Sep 2028 59,672 1,537.65 Y 2025 GENERAL DYNAMICS ORD AND TACT SYS / ST PETERSBURG, FL C / IDIQ PICATINNY ARSENAL, NJ Sep 2025 Sep 2028 24,672 1,537.65 Y LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army Location of PCO UNCLASSIFIED Page 7 of 53 Award Date Date of First Delivery Item Number / Title [DODIC]: E27319 / M119 RED BAG PROPELLING CHARGE P-1 Line #18 Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date Volume 1 - 477 === page 510 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E27502 / PROP CHG, 155mm ARTY MACS, M231 Series [DA12] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) 380.971 Less PY Advance Procurement ($ in Millions) - - 45.745 37.434 - Net Procurement (P-1) ($ in Millions) 380.971 Plus CY Advance Procurement ($ in Millions) - - 45.745 37.434 - Total Obligation Authority ($ in Millions) 380.971 - - 45.745 37.434 FY 2027 Base FY 2027 OOC - - 116.689 FY 2027 Total - - - 116.689 - 116.689 - - - 116.689 - 116.689 - - 116.689 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years FY 2025 FY 2026 ($) Qty (Each) Total Cost 1,848.11 188,640 348.628 241.67 83,800 20.252 350.77 68,701 82.41 194,391 16.020 92.99 86,346 8.029 120.18 106.83 49,363 5.273 115.01 21,792 2.506 15.13 12,300 0.186 30.50 5,500 - - 370.108 - - - 370.108 - Acceptance Test - - 3.131 First Article Test - - 0.500 Subtotal: Support Acceptance Testing Cost - - Production Engineering - Subtotal: Support Production Engineering Cost - Unit Cost Cost Elements ($ M) Unit Cost ($) Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) FY 2027 OOC Total Cost Qty Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty ($) (Each) (Each) 24.098 358.04 218,477 78.224 - - 70,762 8.504 122.67 225,031 27.605 - 135.00 17,862 2.411 137.80 56,804 7.828 0.168 35.50 4,397 0.156 36.23 13,982 - 30.955 - - 35.170 - - 30.955 - - 35.170 - - - 3.643 - - 0.186 - - 6.646 - - - 3.631 - - 10.289 - - - 7.233 - - 4.501 - - 7.233 - - 4.501 - Unit Cost ($ M) Total Cost Qty ($) (Each) ($ M) - 358.04 218,477 78.224 - - 122.67 225,031 27.605 - - - 137.80 56,804 7.828 0.507 - - - 36.23 13,982 0.507 - 114.162 - - - - - 114.162 - 114.162 - - - - - 114.162 - - 0.173 - - - - - 0.173 - - - - - - - - - 0.186 - - 0.173 - - - - - 0.173 - 2.078 - - 2.352 - - - - - 2.352 - 2.078 - - 2.352 - - - - - 2.352 Hardware Cost Recurring Cost LOAD, ASSEMBLE, (†) PACK (LAP) COMBUSTIBLE CASES - M231 (†) CONTAINER, M231 (†) IGNITION PROPELLANT, (†) MACS Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Production Engineering Cost LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 8 of 53 P-1 Line #18 Volume 1 - 478 === page 511 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E27502 / PROP CHG, 155mm ARTY MACS, M231 Series [DA12] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Gross/Weapon System Cost Unit Cost ($) - FY 2025 Total Cost Qty (Each) ($ M) - 380.971 Unit Cost ($) Qty (Each) - FY 2026 Total Cost ($ M) - 45.745 Unit Cost ($) - FY 2027 Base Total Cost Qty (Each) ($ M) - 37.434 Unit Cost ($) - FY 2027 OOC Total Cost Qty (Each) ($ M) - 116.689 Unit Cost ($) - FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) - ($) - - Total Cost Qty (Each) ($ M) - 116.689 Remarks: FY2026 to FY2027 costs include a component breakout strategy with several multiple award IDIQ's that are based on competition, utilizing best value (technical and cost). Unit cost increases are driven by materials and labor. (†) indicates the presence of a P-5a LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 9 of 53 P-1 Line #18 Volume 1 - 479 === page 512 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 O O C Cost Elements LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) COMBUSTIBLE CASES - M231 COMBUSTIBLE CASES - M231 COMBUSTIBLE CASES - M231 COMBUSTIBLE CASES - M231 CONTAINER, M231 CONTAINER, M231 CONTAINER, M231 CONTAINER, M231 IGNITION PROPELLANT, MACS IGNITION PROPELLANT, MACS IGNITION PROPELLANT, MACS IGNITION PROPELLANT, MACS (†) P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: E27502 / PROP CHG, 155mm ARTY MACS, M231 Series [DA12] Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 GENERAL DYNAMICSOTS, INC. / HAMPTON, AR C / IDIQ PICATINNY ARSENAL, NJ Sep 2025 Jul 2029 72,600 241.67 Y 2025 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Jan 2032 11,200 241.67 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Jan 2032 68,701 350.77 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Jan 2033 218,477 358.04 Y 2025 TO BE SELECTED / TO BE SELECTED Option / FFP PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 11,568 92.99 Y 2025 ARMTEC DEFENSE PRODUCTS CO / COACHELLA, CA Option / FFP PICATINNY ARSENAL, NJ Sep 2025 Dec 2026 74,778 92.99 Y 2026 ARMTEC DEFENSE PRODUCTIONS CO. / COACHELLA, CA Option / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Sep 2027 70,762 120.18 Y 2027 TO BE SELECTED / TO BE SELECTED C / FFP PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 225,031 122.67 Y 2025 TO BE SELECTED / TO BE SELECTED Option / FFP PICATINNY ARSENAL, NJ Mar 2026 Mar 2027 2,916 115.01 Y 2025 CONCO INC. / LOUISVILLE, KY Option / FFP PICATINNY ARSENAL, NJ Jul 2025 Jun 2026 18,876 115.01 Y 2026 CONCO INC. / LOUISVILLE, KY Option / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Mar 2027 17,862 135.00 Y 2027 TO BE SELECTED / TO BE SELECTED Option / FFP PICATINNY ARSENAL, NJ Mar 2027 Mar 2028 56,804 137.80 Y 2025 TO BE SELECTED / TO BE SELECTED Option / FFP PICATINNY ARSENAL, NJ Mar 2026 Mar 2027 800 30.50 N 2025 ST. MARKS POWDER INC. / CRAWFORDVILLE, FL Option / FFP PICATINNY ARSENAL, NJ Jul 2025 Jun 2026 4,700 30.50 Y 2026 ST. MARKS POWDER INC. / CRAWFORDVILLE, FL Option / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Mar 2027 4,397 35.50 Y 2027 TO BE SELECTED / TO BE SELECTED C / FFP PICATINNY ARSENAL, NJ Aug 2027 Mar 2028 13,982 36.23 Y (Each) RFP Issue Date indicates the presence of a P-21 LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 10 of 53 P-1 Line #18 Volume 1 - 480 === page 513 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E27502 / PROP CHG, 155mm ARTY MACS, M231 Series [DA12] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 188640 1 2025 ARMY 72.600 .000 72.600 A - - - - - - - - - - - - - 1 2025 MC (‡) 7.920 .000 7.920 A - - - - - - - - - - - - - 72.600 7.920 1 2025 Total 80.520 .000 80.520 - - - - - - - - - - - - - 80.520 2 2025 ARMY 11.200 .000 11.200 A - - - - - - - 11.200 2 2025 MC (‡) 7.962 .000 7.962 A - - - - - - - 7.962 2 2025 Total 19.162 .000 19.162 - - - - - - - 19.162 2 2026 ARMY 68.701 .000 68.701 A - - - - - - - 68.701 2 2026 MC (‡) 127.222 .000 127.222 A - - - - - - - 127.222 2 2026 Total 195.923 .000 195.923 - - - - - - - 195.923 2 2027 ARMY 218.477 .000 218.477 218.477 2 2027 MC (‡) 172.991 .000 172.991 172.991 2 2027 Total 391.468 .000 391.468 391.468 O C T N O V D E C J A N LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 53 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 481 === page 514 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E27502 / PROP CHG, 155mm ARTY MACS, M231 Series [DA12] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 188640 1 2025 ARMY 72.600 .000 72.600 - - - - - - - - - - - - - - - - - - - - - - - - 1 2025 MC (‡) 7.920 .000 7.920 - - - - - - - - - - - - - - - - - - - - - - - - 7.920 1 2025 Total 80.520 .000 80.520 - - - - - - - - - - - - - - - - - - - - - - - - 80.520 2 2025 ARMY 11.200 .000 11.200 - - - - - - - - - - - - - - - - - - - - - - - - 11.200 2 2025 MC (‡) 7.962 .000 7.962 - - - - - - - - - - - - - - - - - - - - 7.962 - - - .000 2 2025 Total 19.162 .000 19.162 - - - - - - - - - - - - - - - - - - - - 7.962 - - - 11.200 2 2026 ARMY 68.701 .000 68.701 - - - - - - - - - - - - - - - - - - - - - - - - 68.701 2 2026 MC (‡) 127.222 .000 127.222 - - - - - - - - - - - - - - - - - - - - - - - - 127.222 2 2026 Total 195.923 .000 195.923 - - - - - - - - - - - - - - - - - - - - - - - - 195.923 2 2027 ARMY 218.477 .000 218.477 A - - - - - - - - - - - - - - - - - - - 218.477 2 2027 MC (‡) 172.991 .000 172.991 A - - - - - - - - - - - - - - - - - - - 172.991 2 2027 Total 391.468 .000 391.468 - - - - - - - - - - - - - - - - - - - 391.468 O C T N O V D E C J A N LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 53 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G 72.600 S E P Volume 1 - 482 === page 515 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E27502 / PROP CHG, 155mm ARTY MACS, M231 Series [DA12] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 188640 1 2025 ARMY 72.600 .000 72.600 - - - - - - - - - 10.760 30.000 31.840 1 2025 MC (‡) 7.920 .000 7.920 - - - - - - - - - 3.960 1 2025 Total 80.520 .000 80.520 - - - - - - - - - 14.720 33.960 31.840 2 2025 ARMY 11.200 .000 11.200 - - - - - - - - - - - 2 2025 MC (‡) 7.962 7.962 .000 - - - - - - - - - - 2 2025 Total 19.162 7.962 11.200 - - - - - - - - - - 2 2026 ARMY 68.701 .000 68.701 - - - - - - - - - 2 2026 MC (‡) 127.222 .000 127.222 - - - - - - - - - 2 2026 Total 195.923 .000 195.923 - - - - - - - - 2 2027 ARMY 218.477 .000 218.477 - - - - - - - - 2 2027 MC (‡) 172.991 .000 172.991 - - - - - - - 2 2027 Total 391.468 .000 391.468 - - - - - - - O C T N O V D E C J A N LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army F E B M A R A P R M A Y 3.960 .000 - .000 - - - - - - - - - - - - .000 - - - - - - - - - - - - - 11.200 - - - - - - - - - - - - - - .000 - - - - - - - - - - - - - - 11.200 - - - - - - - - - - - - - - - 68.701 - - - - - - - - - - - - - - - 127.222 - - - - - - - - - - - - - - - - 195.923 - - - - - - - - - - - - - - - - 218.477 - - - - - - - - - - - - - - - - - 172.991 - - - - - - - - - - - - - - - - - 391.468 J U N J U L A U G UNCLASSIFIED Page 13 of 53 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 483 === page 516 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E27502 / PROP CHG, 155mm ARTY MACS, M231 Series [DA12] Fiscal Year 2031 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2030 1 OCT Calendar Year 2031 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2032 M A Y J U N J U L Calendar Year 2032 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 188640 1 2025 ARMY 72.600 72.600 .000 1 2025 MC (‡) 7.920 7.920 .000 .000 1 2025 Total 80.520 80.520 .000 - - - - - - - - - - - - - - - - - - - 2 2025 ARMY 11.200 .000 11.200 - - - - - - - - - - - - - - - 3.000 3.000 3.000 2.200 2 2025 MC (‡) 7.962 7.962 .000 - - - - - - - - - - - - - - - - - - - 2 2025 Total 19.162 7.962 11.200 - - - - - - - - - - - - - - - 3.000 3.000 3.000 2.200 - - - - 2 2026 ARMY 68.701 .000 68.701 - - - - - - - - - - - - - - - 5.751 5.751 5.751 5.751 5.751 5.751 5.751 5.751 2 2026 MC (‡) 127.222 .000 127.222 - - - - - - - - - - - - - - - 10.611 10.611 10.611 10.611 10.611 10.611 10.611 10.611 10.611 31.723 2 2026 Total 195.923 .000 195.923 - - - - - - - - - - - - - - - 16.362 16.362 16.362 16.362 16.362 16.362 16.362 16.362 16.362 48.665 2 2027 ARMY 218.477 .000 218.477 - - - - - - - - - - - - - - - - - - - - - - - - 218.477 2 2027 MC (‡) 172.991 .000 172.991 - - - - - - - - - - - - - - - - - - - - - - - - 172.991 2 2027 Total 391.468 .000 391.468 - - - - - - - - - - - - - - - - - - - - - - - - 391.468 .000 O C T N O V D E C J A N LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 53 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R - - - - - .000 .000 .000 M A Y J U N J U L A U G - .000 5.751 16.942 S E P Volume 1 - 484 === page 517 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E27502 / PROP CHG, 155mm ARTY MACS, M231 Series [DA12] Fiscal Year 2033 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2032 1 OCT Calendar Year 2033 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2034 M A Y J U N J U L Calendar Year 2034 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 188640 1 2025 ARMY 72.600 72.600 .000 1 2025 MC (‡) 7.920 7.920 .000 .000 1 2025 Total 80.520 80.520 .000 2 2025 ARMY 11.200 11.200 .000 2 2025 MC (‡) 7.962 7.962 .000 2 2025 Total 19.162 19.162 .000 2 2026 ARMY 68.701 51.759 16.942 2 2026 MC (‡) 127.222 95.499 31.723 10.611 10.611 10.501 2 2026 Total 195.923 147.258 48.665 16.362 16.362 15.941 2 2027 ARMY 218.477 .000 218.477 - - - 18.211 18.206 18.206 18.206 18.206 18.206 18.206 18.206 18.206 18.206 18.206 18.206 2 2027 MC (‡) 172.991 .000 172.991 - - - 24.715 24.715 24.712 24.712 24.712 24.712 24.713 2 2027 Total 391.468 .000 391.468 - - - 42.926 42.921 42.918 42.918 42.918 42.918 42.919 18.206 18.206 18.206 18.206 18.206 .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 .000 .000 - - - 5.751 5.751 5.440 O C T N O V D E C - - - - - - - - - - - - - - - - - - - - - .000 .000 .000 - J A N LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army - F E B - M A R - A P R - M A Y - J U N - J U L - - A U G UNCLASSIFIED Page 15 of 53 - S E P - O C T - N O V - - - - - - - - - .000 D E C .000 .000 J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G - .000 S E P Volume 1 - 485 === page 518 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E27502 / PROP CHG, 155mm ARTY MACS, M231 Series [DA12] Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 GENERAL DYNAMICS-OTS, INC. - HAMPTON, AR 30,000 50,000 125,000 6 6 36 42 6 6 36 42 2 TO BE SELECTED - TO BE SELECTED 30,000 60,000 100,000 6 6 36 42 6 6 70 76 Remarks: Extended delivery times are due to limited suppliers for components and increased volume of prior year orders due to world conflicts. (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 16 of 53 P-1 Line #18 Volume 1 - 486 === page 519 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: E27513 / 155MM EXTENDED RANGE MODULAR CHARGE MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - - 52.842 - 52.842 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - - 52.842 - 52.842 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - - 52.842 - 52.842 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) FY 2027 OOC Total Cost Qty ($) (Each) ($ M) 109,000 Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) Total Cost Qty ($) (Each) ($ M) 109,000 Hardware Cost Recurring Cost 155mm Extended Range Modular Charge - - - - - - - - - 415.61 Subtotal: Recurring Cost - - - - - - - - - - - - - - - - - - - - First Article Test - - - - - - - - - Acceptance Test - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - - - - - - - Production Engineering - - - - - - - Subtotal: Support Production Engineering Cost - - - - - - - Subtotal: Hardware Cost 45.301 - - - 415.61 45.301 - 45.301 - - - - - 45.301 - 45.301 - - - - - 45.301 - - 1.050 - - - - - 1.050 - - 1.088 - - - - - 1.088 - - - 2.138 - - - - - 2.138 - - - - 3.903 - - - - - 3.903 - - - - 3.903 - - - - - 3.903 Support - Acceptance Testing Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - - - - - - - - - - 1.500 - - - - - 1.500 Subtotal: Support - Quality Assurance Cost - - - - - - - - - - - 1.500 - - - - - 1.500 Gross/Weapon System Cost - - - - - - - - - - - 52.842 - - - - - 52.842 LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 17 of 53 P-1 Line #18 Volume 1 - 487 === page 520 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: E27514 / 155MM EXTENDED RANGE PRIMER MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - - 2.516 - 2.516 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - - 2.516 - 2.516 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - - 2.516 - 2.516 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost 155mm Extended Range Primer - - - - - - - - - 37.52 53,000 1.989 - - - 37.52 53,000 1.989 Subtotal: Recurring Cost - - - - - - - - - - - 1.989 - - - - - 1.989 - - - - - - - - - - - 1.989 - - - - - 1.989 Acceptance Test - - - - - - - - - - - 0.336 - - - - - 0.336 Subtotal: Support Acceptance Testing Cost - - - - - - - - - - - 0.336 - - - - - 0.336 Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Production Engineering Cost Production Engineering - - - - - - - - - - - 0.191 - - - - - 0.191 Subtotal: Support Production Engineering Cost - - - - - - - - - - - 0.191 - - - - - 0.191 Gross/Weapon System Cost - - - - - - - - - - - 2.516 - - - - - 2.516 LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 18 of 53 P-1 Line #18 Volume 1 - 488 === page 521 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E62208 / FUZE,155mm ARTY Point Detonating (PD), M739 Series [N340] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 32.853 8.761 8.990 - 8.990 - Gross/Weapon System Cost ($ in Millions) 584.600 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 584.600 Plus CY Advance Procurement ($ in Millions) - - - - - 32.853 8.761 8.990 - 8.990 - Total Obligation Authority ($ in Millions) 584.600 FY 2027 Total - - - - - 32.853 8.761 8.990 - 8.990 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost FY 2025 Total Cost Qty ($) (Each) ($ M) (†) 179.64 2,800,641 Subtotal: Recurring Cost - Acceptance Test - First Article Test - Subtotal: Support Acceptance Testing Cost Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE ROUND Subtotal: Hardware Cost 503.099 86.31 - 503.099 - - 503.099 - - 1.456 - 76.385 - - 267,571 23.094 101.87 55,408 5.644 105.85 54,950 5.816 - - - 105.85 54,950 5.816 - 23.094 - - 5.644 - - 5.816 - - - - - 5.816 - 23.094 - - 5.644 - - 5.816 - - - - - 5.816 - - 0.849 - - 0.281 - - 0.281 - - - - - 0.281 - - 6.327 - - - - - - - - - - - - 77.841 - - 7.176 - - 0.281 - - 0.281 - - - - - 0.281 Support - Acceptance Testing Cost Support - Production Engineering Cost Production Engineering - - 3.660 - - 2.583 - - 2.836 - - 2.893 - - - - - 2.893 Subtotal: Support Production Engineering Cost - - 3.660 - - 2.583 - - 2.836 - - 2.893 - - - - - 2.893 Gross/Weapon System Cost - - 584.600 - - 32.853 - - 8.761 - - 8.990 - - - - - 8.990 Remarks: FY2026 New base contract. FY2025 to FY2027 costs include a component breakout strategy with several multiple award Indefinite Dollar Indefinite Quantity's (IDIQ's) that are based on competition, utilizing best value (technical and cost). Unit cost increases are driven by materials and labor. LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 19 of 53 P-1 Line #18 Volume 1 - 489 === page 522 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All ID Code (A=Service Ready, B=Not Service Ready) : A (†) Item Number / Title [DODIC]: E62208 / FUZE,155mm ARTY Point Detonating (PD), M739 Series [N340] MDAP/MAIS Code: indicates the presence of a P-5a LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 20 of 53 P-1 Line #18 Volume 1 - 490 === page 523 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E62208 / FUZE,155mm ARTY Point Detonating (PD), M739 Series [N340] Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 ACTION MANUFACTURING COMPANY INC / BRISTOL, PA C / IDIQ PICATINNY ARSENAL, NJ Jun 2025 Jun 2028 267,571 86.31 Y 2026 TO BE SELECTED / TO BE SELECTED Option / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Mar 2029 55,408 101.87 Y 2027 TO BE SELECTED / TO BE SELECTED Option / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Mar 2030 54,950 105.85 Y RFP Issue Date indicates the presence of a P-21 LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 21 of 53 P-1 Line #18 Volume 1 - 491 === page 524 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E62208 / FUZE,155mm ARTY Point Detonating (PD), M739 Series [N340] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 2800641 2 2025 ARMY 267.571 .000 267.571 1 2026 ARMY 55.408 .000 55.408 1 2027 ARMY 54.950 .000 54.950 A - - - - - - - - - - - - - - - - 267.571 A - - - - - - - 55.408 54.950 O C T N O V D E C J A N LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 22 of 53 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 492 === page 525 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E62208 / FUZE,155mm ARTY Point Detonating (PD), M739 Series [N340] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 2800641 2 2025 ARMY 267.571 .000 267.571 - - - - - - - - - - - - - - - - - - - - 1 2026 ARMY 55.408 .000 55.408 - - - - - - - - - - - - - - - - - - - - - - - - 55.408 1 2027 ARMY 54.950 .000 54.950 A - - - - - - - - - - - - - - - - - - - 54.950 O C T N O V D E C J A N LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 23 of 53 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y 35.000 35.000 35.000 35.000 127.571 J U N J U L A U G S E P Volume 1 - 493 === page 526 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E62208 / FUZE,155mm ARTY Point Detonating (PD), M739 Series [N340] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND Prior Years Deliveries: 2800641 2 2025 ARMY 267.571 1 2026 ARMY 55.408 140.000 127.571 35.000 35.000 35.000 22.571 .000 55.408 - - - - - 1 2027 ARMY 54.950 .000 54.950 - - - - - O C T N O V D E C J A N LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army .000 F E B 29.978 25.430 M A R .000 A P R M A Y J U N J U L A U G UNCLASSIFIED Page 24 of 53 S E P O C T N O V D E C J A N F E B P-1 Line #18 21.302 21.302 12.346 M A R A P R M A Y .000 J U N J U L A U G S E P Volume 1 - 494 === page 527 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E62208 / FUZE,155mm ARTY Point Detonating (PD), M739 Series [N340] Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 TO BE SELECTED - TO BE SELECTED 20,000 35,000 50,000 7 7 36 43 10 10 36 46 2 ACTION MANUFACTURING COMPANY INC - BRISTOL, PA 20,000 35,000 50,000 10 10 36 46 10 10 36 46 Remarks: Gap in delivery schedule for FY 2027 is order is due to scheduled award in March 2027 and PLT. Delivery schedule can shift once award is made to limit gap in deliveries. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 25 of 53 P-1 Line #18 Volume 1 - 495 === page 528 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E63000 / PRIMER,155mm ARTY Percussion, M82 Series [N523] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - 13.113 - - - - - - - - - 13.113 - - - - - - - - - 13.113 - - - - - Gross/Weapon System Cost ($ in Millions) 102.571 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 102.571 Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) 102.571 FY 2026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 53.46 78.870 18.23 Subtotal: Recurring Cost - - 78.869 - - 78.869 - Acceptance Test - First Article Test - - 3.321 - 14.892 Subtotal: Support Acceptance Testing Cost - - Production Verification Test - Subtotal: Support - Product Improvement Cost ROUND Subtotal: Hardware Cost 1,475,187 414,865 7.563 - - - - - - - - - - - - - 7.563 - - - - - - - - - - - - - 7.563 - - - - - - - - - - - - - - 1.350 - - - - - - - - - - - - - - 1.500 - - - - - - - - - - - - 18.213 - - 2.850 - - - - - - - - - - - - - - - - 0.350 - - - - - - - - - - - - - - - - - 0.350 - - - - - - - - - - - - Support - Acceptance Testing Cost Support - Product Improvement Cost Support - Production Engineering Cost Production Engineering - - 5.488 - - 2.350 - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - 5.488 - - 2.350 - - - - - - - - - - - - Gross/Weapon System Cost - - 102.571 - - 13.113 - - - - - - - - - - - - LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 26 of 53 P-1 Line #18 Volume 1 - 496 === page 529 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All ID Code (A=Service Ready, B=Not Service Ready) : A (†) Item Number / Title [DODIC]: E63000 / PRIMER,155mm ARTY Percussion, M82 Series [N523] MDAP/MAIS Code: indicates the presence of a P-5a LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 27 of 53 P-1 Line #18 Volume 1 - 497 === page 530 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements COMPLETE ROUND O O C FY Contractor and Location 2025 SECURITY SIGNALS INC / CORDOVA, TN LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Method/Type or Funding Vehicle C / IDIQ Location of PCO ROCK ISLAND ARSENAL, IL UNCLASSIFIED Page 28 of 53 Item Number / Title [DODIC]: E63000 / PRIMER,155mm ARTY Percussion, M82 Series [N523] Award Date Date of First Delivery (Each) Jul 2025 Jul 2028 414,865 P-1 Line #18 Qty Specs Date Unit Cost Avail Revision Now? Available ($) 18.23 RFP Issue Date Y Volume 1 - 498 === page 531 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E99200 / ARTY, FUZE, ELECTRONIC TIME, M762A1 MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC FY 2027 Total - FY 2026 - - - - 49.356 19.910 - - - - - - - - 49.356 19.910 - - - - - - - - 49.356 19.910 - - - - Gross/Weapon System Cost ($ in Millions) 166.266 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 166.266 Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) 166.266 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years FY 2025 FY 2026 (Each) (†) 487.06 319,000 155.372 487.06 85,050 41.424 809.22 23,450 18.976 - - - - - - - - - Subtotal: Recurring Cost - - 155.372 - - 41.424 - - 18.976 - - - - - - - - - - - 155.372 - - 41.424 - - 18.976 - - - - - - - - - Acceptance Test - - - - - - - - 0.136 - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - - - - - - - 0.136 - - - - - - - - - Production Qualification Test - - 3.125 - - 5.491 - - - - - - - - - - - - Subtotal: Support - Product Improvement Cost - - 3.125 - - 5.491 - - - - - - - - - - - - ($ M) ($) Qty (Each) Unit Cost ($ M) ($) Qty (Each) Unit Cost ($ M) ($) Total Cost FY 2027 Total ($) Cost Elements Unit Cost Total Cost FY 2027 OOC Qty Unit Cost Total Cost FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE ROUND Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Product Improvement Cost Support - Production Engineering Cost Production Engineering - - 7.769 - - 2.441 - - 0.798 - - - - - - - - - Subtotal: Support Production Engineering Cost - - 7.769 - - 2.441 - - 0.798 - - - - - - - - - Gross/Weapon System Cost - - 166.266 - - 49.356 - - 19.910 - - - - - - - - - (†) indicates the presence of a P-5a LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 29 of 53 P-1 Line #18 Volume 1 - 499 === page 532 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Method/Type or Funding Vehicle Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 L-3 FUZING & ORDANCE SYSTEMS INC / CINCINNATI, OH SS / IDIQ PICATINNY ARSENAL, NJ Apr 2025 Sep 2028 85,050 487.06 Y 2026 L-3 FUZING & ORDANCE SYSTEMS INC / CINCINNATI, OH SS / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2028 23,450 809.22 Y LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army Location of PCO Award Date Item Number / Title [DODIC]: E99200 / ARTY, FUZE, ELECTRONIC TIME, M762A1 UNCLASSIFIED Page 30 of 53 P-1 Line #18 (Each) RFP Issue Date Volume 1 - 500 === page 533 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E99250 / FUZE,155mm ARTY Precision Guidance Kit (PGK) [NA37] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 61.419 39.653 63.105 - 63.105 - Gross/Weapon System Cost ($ in Millions) 1,306.789 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 1,306.789 Plus CY Advance Procurement ($ in Millions) - - - - - 61.419 39.653 63.105 - 63.105 - Total Obligation Authority ($ in Millions) 1,306.789 FY 2027 Total - - - - - 61.419 39.653 63.105 - 63.105 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements FY 2025 ($) Qty (Each) Total Cost 7,332.22 141,595 1,038.205 Unit Cost ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE ROUND (†) Subtotal: Recurring Cost 7,887.63 6,722 53.021 26,975.00 1,235 33.314 56,861.50 1,009 57.373 - - - 56,861.50 1,009 57.373 - - 1,038.205 - - 53.021 - - 33.314 - - 57.373 - - - - - 57.373 GPS Receiver Obsolescence (MCode Compliance) - - 16.614 - - - - - - - - - - - - - - - Melody II ASIC Chips - - 46.447 - - - - - - - - - - - - - - - M762A1 Safe & Arm PBXW14 - - 10.509 - - - - - - - - - - - - - - - Melody II Qual - - 15.969 - - - - - - - - - - - - - - - - - 89.539 - - - - - - - - - - - - - - - - - 1,127.744 - - 53.021 - - 33.314 - - 57.373 - - - - - 57.373 Acceptance Test - - 27.542 - - 3.500 - - 0.500 - - 0.500 - - - - - 0.500 Subtotal: Support Acceptance Testing Cost - - 27.542 - - 3.500 - - 0.500 - - 0.500 - - - - - 0.500 - 68.058 - - - - - 1.839 - - - - - - - - - Non Recurring Cost Subtotal: Non Recurring Cost Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Engineering Change Proposals Cost Engineering Change Proposals - LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 31 of 53 P-1 Line #18 Volume 1 - 501 === page 534 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E99250 / FUZE,155mm ARTY Precision Guidance Kit (PGK) [NA37] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) Subtotal: Support Engineering Change Proposals Cost FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 68.058 - - - - - 1.839 - - - - - - - - - Production Qualification Test - - 4.038 - - - - - - - - - - - - - - - Reliability - - 9.567 - - - - - - - - - - - - - - - - - 13.605 - - - - - - - - - - - - - - - Support - Product Improvement Cost Subtotal: Support - Product Improvement Cost Support - Production Engineering Cost Production Engineering - - 69.840 - - 4.898 - - 4.000 - - 5.232 - - - - - 5.232 Subtotal: Support Production Engineering Cost - - 69.840 - - 4.898 - - 4.000 - - 5.232 - - - - - 5.232 Gross/Weapon System Cost - - 1,306.789 - - 61.419 - - 39.653 - - 63.105 - - - - - 63.105 Remarks: FY 2026 funding is supporting the initial procurement of the M1156E5 Precision Guidance Kit (PGK-E5), which will become M1156A2 post Type Classification (TC) and will include anti-jam (AJ) capability in a Global Positioning System (GPS) degraded environment. FY 2026 thru FY 2027 unit cost is based on most recent Independent Government Cost Estimates (IGCEs) performed in preparation for production contract award. Pricing for each year will be based on a linear pricing curve with decreasing prices for higher quantities. It is a sliding scale with lower unit costs as quantities increase and higher unit costs as quantities decrease. (†) indicates the presence of a P-5a LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 32 of 53 P-1 Line #18 Volume 1 - 502 === page 535 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: E99250 / FUZE,155mm ARTY Precision Guidance Kit (PGK) [NA37] Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN Option / FFP PICATINNY ARSENAL, NJ Jul 2025 Jul 2027 6,722 7,887.63 Y 2026 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN SS / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Mar 2028 1,235 26,975.00 Y 2027 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN SS / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Mar 2029 1,009 56,861.50 Y (Each) RFP Issue Date indicates the presence of a P-21 LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 33 of 53 P-1 Line #18 Volume 1 - 503 === page 536 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E99250 / FUZE,155mm ARTY Precision Guidance Kit (PGK) [NA37] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 141595 1 2025 ARMY 6,722 0 6,722 1 2026 ARMY 1,235 0 1,235 1 2027 ARMY 1,009 0 1,009 A - - - - - - - - - - - - - - - 6,722 A - - - - - - - 1,235 1,009 O C T N O V D E C J A N LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 34 of 53 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 504 === page 537 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E99250 / FUZE,155mm ARTY Precision Guidance Kit (PGK) [NA37] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L 614 A U G S E P COMPLETE ROUND Prior Years Deliveries: 141595 1 2025 ARMY 6,722 0 6,722 - - - - - - - - - 614 614 614 614 614 581 - 615 614 614 614 1 2026 ARMY 1,235 0 1,235 - - - - - - - - - - - - - - - - - 415 415 405 1 2027 ARMY 1,009 0 1,009 A - - - - - - - - - - - - - - - O C T N O V D E C J A N LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 35 of 53 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y 0 0 J U N J U L A U G - 1,009 S E P Volume 1 - 505 === page 538 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E99250 / FUZE,155mm ARTY Precision Guidance Kit (PGK) [NA37] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND Prior Years Deliveries: 141595 1 2025 ARMY 6,722 6,722 0 1 2026 ARMY 1,235 1,235 0 1 2027 ARMY 1,009 0 1,009 0 0 O C T N O V D E C J A N LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army F E B 333 333 333 M A R A P R M A Y 10 J U N 0 J U L A U G UNCLASSIFIED Page 36 of 53 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 506 === page 539 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E99250 / FUZE,155mm ARTY Precision Guidance Kit (PGK) [NA37] Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 NORTHROP GRUMMAN SYSTEMS CORP PLYMOUTH, MN MSR For 2027 1-8-5 For 2027 MAX For 2027 ALT Prior to Oct 1 333 333 1,008 13 ALT After Oct 1 Reorder Manufacturing PLT 9 24 Total After Oct 1 ALT Prior to Oct 1 33 ALT After Oct 1 3 Manufacturing PLT 6 Total After Oct 1 24 30 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 37 of 53 P-1 Line #18 Volume 1 - 507 === page 540 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E99909 / Multi-Option Fuze, Artillery M782 [NA09] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 19.088 32.137 27.000 - 27.000 - Gross/Weapon System Cost ($ in Millions) 174.096 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 174.096 Plus CY Advance Procurement ($ in Millions) - - - - - 19.088 32.137 27.000 - 27.000 - Total Obligation Authority ($ in Millions) 174.096 FY 2027 Total - - - - - 19.088 32.137 27.000 - 27.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost (†) 74,036 154.146 6,600 12.246 11,203 26.887 6,818 22.288 - - - 6,818 22.288 - - 154.146 - - 12.246 - - 26.887 - - 22.288 - - - - - 22.288 - - 154.146 - - 12.246 - - 26.887 - - 22.288 - - - - - 22.288 First Article Test - - 1.250 - - - - - - - - - - - - - - - Acceptance Test - - 16.912 - - 2.700 - - 0.300 - - 0.466 - - - - - 0.466 Subtotal: Support Acceptance Testing Cost - - 18.162 - - 2.700 - - 0.300 - - 0.466 - - - - - 0.466 Production Verification Test - - - - - 1.739 - - - - - - - - - - - - Subtotal: Support - Product Improvement Cost - - - - - 1.739 - - - - - - - - - - - - Complete Round 2,082.04 Subtotal: Recurring Cost Subtotal: Hardware Cost 1,855.44 2,400.00 3,268.97 3,268.97 Support - Acceptance Testing Cost Support - Product Improvement Cost Support - Production Engineering Cost Production Engineering - - 1.788 - - 2.403 - - 4.950 - - 4.246 - - - - - 4.246 Subtotal: Support Production Engineering Cost - - 1.788 - - 2.403 - - 4.950 - - 4.246 - - - - - 4.246 Gross/Weapon System Cost - - 174.096 - - 19.088 - - 32.137 - - 27.000 - - - - - 27.000 LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 38 of 53 P-1 Line #18 Volume 1 - 508 === page 541 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All ID Code (A=Service Ready, B=Not Service Ready) : A (†) Item Number / Title [DODIC]: E99909 / Multi-Option Fuze, Artillery M782 [NA09] MDAP/MAIS Code: indicates the presence of a P-5a LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 39 of 53 P-1 Line #18 Volume 1 - 509 === page 542 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (†) Complete Round (†) Complete Round (†) Complete Round (†) O O C P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: E99909 / Multi-Option Fuze, Artillery M782 [NA09] Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 NORTHROP GRUMMAN SYSTEMS CORP / ROCKET CENTER, WV SS / IDIQ ROCK ISLAND ARSENAL, IL Aug 2025 Aug 2027 6,600 1,855.44 Y 2026 NORTHROP GRUMMAN SYSTEMS CORP / ROCKET CENTER, WV SS / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2028 11,203 2,400.00 Y 2027 NORTHROP GRUMMAN SYSTEMS CORP / ROCKET CENTER, WV SS / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2030 6,818 3,268.97 Y (Each) RFP Issue Date indicates the presence of a P-21 LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 40 of 53 P-1 Line #18 Volume 1 - 510 === page 543 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E99909 / Multi-Option Fuze, Artillery M782 [NA09] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Complete Round Prior Years Deliveries: 74036 1 2025 ARMY 6.600 .000 1 2026 ARMY 11.203 .000 11.203 6.600 1 2027 ARMY 6.818 .000 A - - - - - - - - - - - - - - 6.600 A - - - - - - - 11.203 6.818 6.818 O C T N O V D E C J A N LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 41 of 53 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 511 === page 544 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E99909 / Multi-Option Fuze, Artillery M782 [NA09] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Complete Round Prior Years Deliveries: 74036 1 2025 ARMY 6.600 .000 6.600 - - - - - - - - - - 2.000 2.000 2.000 .600 1 2026 ARMY 11.203 .000 11.203 - - - - - - - - - - - - - - - - - 1.870 1.870 1.870 1.870 1.870 1.853 1 2027 ARMY 6.818 .000 A - - - - - - - - - - - - - - - - - - 6.818 O C T N O V D E C J A N LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 42 of 53 S E P O C T N O V .000 D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G .000 - 6.818 S E P Volume 1 - 512 === page 545 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E99909 / Multi-Option Fuze, Artillery M782 [NA09] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Complete Round Prior Years Deliveries: 74036 1 2025 ARMY 6.600 6.600 .000 1 2026 ARMY 11.203 11.203 .000 1 2027 ARMY 6.818 .000 6.818 .000 .000 O C T N O V D E C J A N LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 43 of 53 S E P O C T N O V D E C J A N F E B P-1 Line #18 4.000 2.818 M A R A P R .000 M A Y J U N J U L A U G S E P Volume 1 - 513 === page 546 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E99909 / Multi-Option Fuze, Artillery M782 [NA09] Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 NORTHROP GRUMMAN SYSTEMS CORP - ROCKET CENTER, WV MSR For 2027 1-8-5 For 2027 MAX For 2027 2,000 8,000 12,000 ALT Prior to Oct 1 ALT After Oct 1 6 Reorder Manufacturing PLT 6 24 Total After Oct 1 ALT Prior to Oct 1 30 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 24 30 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 44 of 53 P-1 Line #18 Volume 1 - 514 === page 547 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: ER8021 / PROP CHG, 155mm ARTY MACS, M232 Series [DA67] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) - 3,639.996 Less PY Advance Procurement ($ in Millions) 153.405 - Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) 160.186 - - - 30.842 160.186 - 160.186 - 153.405 FY 2027 Total - - 30.842 - 3,639.996 - - 153.405 - Total Obligation Authority ($ in Millions) FY 2027 OOC - 30.842 - 3,639.996 FY 2027 Base - 160.186 - 160.186 - - 160.186 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost FY 2025 Total Cost Qty ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty ($) (Each) (Each) 119.11 5,954,876 709.299 56.69 349,515 19.815 84.33 74,004 79.29 6,071,603 481.387 108.45 57,651 6.252 113.33 25.21 28,736,687 724.341 23.59 1,579,350 37.257 117.55 1,275,134 149.890 116.79 73,399 19.98 369,449 7.382 30.50 Unit Cost ($ M) FY 2027 OOC Total Cost Qty Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty ($) (Each) (Each) 6.241 122.04 371,706 45.363 - - 76,224 8.638 115.67 382,857 44.285 - 30.10 356,699 10.737 30.72 1,791,622 55.039 8.573 137.92 15,540 2.143 140.78 78,057 22,400 0.683 35.50 4,810 0.171 36.23 Unit Cost ($ M) Total Cost Qty ($) (Each) ($ M) - 122.04 371,706 45.363 - - 115.67 382,857 44.285 - - - 30.72 1,791,622 55.039 10.989 - - - 140.78 78,057 10.989 24,161 0.875 - - - 36.23 24,161 0.875 Hardware Cost Recurring Cost LOAD, ASSEMBLE, (†) PACK (LAP) CTG CASE COMBUSTIBLE F/155mm (†) PROPELLANT, (†) M31A2 CONTAINER, M232A1 (†) IGNITION PROPELLANT, (†) MACS Subtotal: Recurring Cost - - 2,072.293 - - 72.579 - - 27.930 - - 156.551 - - - - - 156.551 - - 2,072.293 - - 72.579 - - 27.930 - - 156.551 - - - - - 156.551 Acceptance Test - - 13.967 - - 28.253 - - 0.160 - - 0.739 - - - - - 0.739 First Article Test - - 1,292.564 - - 29.001 - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 1,306.531 - - 57.254 - - 0.160 - - 0.739 - - - - - 0.739 Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Engineering Change Proposals Cost LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 45 of 53 P-1 Line #18 Volume 1 - 515 === page 548 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: ER8021 / PROP CHG, 155mm ARTY MACS, M232 Series [DA67] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) Engineering Change Proposals FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 30.670 - - 3.006 - - - - - - - - - - - - - - 30.670 - - 3.006 - - - - - - - - - - - - Value Engineering - - 2.673 - - - - - - - - - - - - - - - Facilitization - - 207.195 - - - - - - - - - - - - - - - - - 209.868 - - - - - - - - - - - - - - - Subtotal: Support Engineering Change Proposals Cost Support - Non-Recurring Support Cost Subtotal: Support - NonRecurring Support Cost Support - Production Engineering Cost Production Engineering - - 20.628 - - 20.567 - - 2.752 - - 2.896 - - - - - 2.896 Subtotal: Support Production Engineering Cost - - 20.628 - - 20.567 - - 2.752 - - 2.896 - - - - - 2.896 Gross/Weapon System Cost - - 3,639.996 - - 153.405 - - 30.842 - - 160.186 - - - - - 160.186 (†) indicates the presence of a P-5a LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 46 of 53 P-1 Line #18 Volume 1 - 516 === page 549 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 O O C Cost Elements Method/Type or Funding Vehicle Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) Contractor and Location 2025 GENERAL DYNAMICSOTS, INC. / HAMPTON, AR C / IDIQ PICATINNY ARSENAL, NJ Sep 2025 Apr 2030 276,240 56.76 Y 2025 AMERICAN ORDNANCE LLC (IAAAP) / MIDDLETOWN, IA Option / IDIQ PICATINNY ARSENAL, NJ Mar 2025 Mar 2030 73,275 56.44 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Mar 2031 74,004 84.33 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ PICATINNY ARSENAL, NJ Mar 2027 Jan 2032 371,706 122.04 Y CTG CASE COMBUSTIBLE F/155mm 2025 ARMTEC DEFENSE PRODUCTS CO / COACHELLA, CA Option / IDIQ PICATINNY ARSENAL, NJ Mar 2025 Mar 2026 57,651 108.45 Y CTG CASE COMBUSTIBLE F/155mm 2026 ARMTEC DEFENSE PRODUCTS CO / COACHELLA, CA Option / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Mar 2027 76,224 113.33 Y CTG CASE COMBUSTIBLE F/155mm 2027 TO BE SELECTED / TO BE SELECTED C / FFP PICATINNY ARSENAL, NJ Jun 2027 Mar 2028 382,857 115.67 Y 2025 GEN DYNAMICS ORDNANCE AND TACTICAL / SALABERRYDE-VALLEYFIELD, CANADA Option / FFP PICATINNY ARSENAL, NJ Aug 2025 Jan 2027 1,579,350 23.59 Y 2026 GEN DYNAMICS ORDNANCE AND TACTICAL / SALABERRYDE-VALLEYFIELD, CANADA Option / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Nov 2027 356,699 30.10 Y 2027 TO BE SELECTED / TO BE SELECTED C / FFP PICATINNY ARSENAL, NJ Jun 2027 Nov 2028 1,791,622 30.72 Y 2025 CONCO INC. / LOUISVILLE, KY Option / IDIQ PICATINNY ARSENAL, NJ Jul 2025 Mar 2026 73,399 116.79 Y 2026 CONCO INC. / LOUISVILLE, KY Option / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Mar 2027 15,540 137.92 Y 2027 TO BE SELECTED / TO BE SELECTED C / FFP PICATINNY ARSENAL, NJ Mar 2027 Mar 2028 78,057 140.78 Y 2025 ST. MARKS POWDER INC. / CRAWFORDVILLE, FL Option / FFP PICATINNY ARSENAL, NJ Jul 2025 Jun 2026 22,400 30.50 Y 2026 ST. MARKS POWDER INC. / CRAWFORDVILLE, FL Option / IDIQ PICATINNY ARSENAL, NJ Mar 2026 Mar 2027 4,810 35.50 Y 2027 TO BE SELECTED / TO BE SELECTED C / FFP PICATINNY ARSENAL, NJ Aug 2027 Mar 2028 24,161 36.23 Y LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) PROPELLANT, M31A2 PROPELLANT, M31A2 CONTAINER, M232A1 CONTAINER, M232A1 CONTAINER, M232A1 IGNITION PROPELLANT, MACS IGNITION PROPELLANT, MACS IGNITION PROPELLANT, MACS Location of PCO Item Number / Title [DODIC]: ER8021 / PROP CHG, 155mm ARTY MACS, M232 Series [DA67] FY PROPELLANT, M31A2 (†) P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All RFP Issue Date indicates the presence of a P-21 LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 47 of 53 P-1 Line #18 Volume 1 - 517 === page 550 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: ER8021 / PROP CHG, 155mm ARTY MACS, M232 Series [DA67] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 5954876 2 2025 ARMY 276.240 .000 276.240 A - - - - - - - - - - - - - 2 2025 MC (‡) 34.050 .000 34.050 A - - - - - - - - - - - - - 34.050 2 2025 Total 310.290 .000 310.290 - - - - - - - - - - - - - 310.290 3 2025 ARMY 73.275 .000 73.275 - - - - - - - - - - - - - 73.275 1 2026 ARMY 74.004 .000 74.004 A - - - - - - - 74.004 1 2026 MC (‡) 44.291 .000 44.291 A - - - - - - - 44.291 1 2026 Total 118.295 .000 118.295 - - - - - - - 118.295 1 2027 ARMY 371.706 .000 371.706 1 2027 MC (‡) 39.884 .000 39.884 39.884 1 2027 Total 411.590 .000 411.590 411.590 A - - - - - - 276.240 371.706 O C T N O V D E C J A N LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 48 of 53 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 518 === page 551 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: ER8021 / PROP CHG, 155mm ARTY MACS, M232 Series [DA67] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 5954876 2 2025 ARMY 276.240 .000 276.240 - - - - - - - - - - - - - - - - - - - - - - - - 2 2025 MC (‡) 34.050 .000 34.050 - - - - - - - - - - - - - - - - - - - - - - - - 34.050 2 2025 Total 310.290 .000 310.290 - - - - - - - - - - - - - - - - - - - - - - - - 310.290 3 2025 ARMY 73.275 .000 73.275 - - - - - - - - - - - - - - - - - - - - - - - - 73.275 1 2026 ARMY 74.004 .000 74.004 - - - - - - - - - - - - - - - - - - - - - - - - 74.004 1 2026 MC (‡) 44.291 .000 44.291 - - - - - - - - - - - - - - - - - - - - - - - - 44.291 1 2026 Total 118.295 .000 118.295 - - - - - - - - - - - - - - - - - - - - - - - - 118.295 1 2027 ARMY 371.706 .000 371.706 A - - - - - - - - - - - - - - - - - - - 371.706 1 2027 MC (‡) 39.884 .000 39.884 A - - - - - - - - - - - - - - - - - - - 39.884 1 2027 Total 411.590 .000 411.590 - - - - - - - - - - - - - - - - - - - 411.590 O C T N O V D E C J A N LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 49 of 53 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G 276.240 S E P Volume 1 - 519 === page 552 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: ER8021 / PROP CHG, 155mm ARTY MACS, M232 Series [DA67] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 5954876 2 2025 ARMY 276.240 .000 276.240 - - - - - - - - - - - - - - - - - - 20.240 32.000 32.000 32.000 32.000 32.000 96.000 2 2025 MC (‡) 34.050 .000 34.050 - - - - - - - - - - - - - - - - - - 11.025 11.025 12.000 2 2025 Total 310.290 .000 310.290 - - - - - - - - - - - - - - - - - - 31.265 43.025 44.000 32.000 32.000 32.000 96.000 3 2025 ARMY 73.275 .000 73.275 - - - - - - - - - - - - - - - - - 1 2026 ARMY 74.004 .000 74.004 - - - - - - - - - - - - - - - - - - - - - - - - 1 2026 MC (‡) 44.291 .000 44.291 - - - - - - - - - - - - - - - - - - - - - - - - 44.291 1 2026 Total 118.295 .000 118.295 - - - - - - - - - - - - - - - - - - - - - - - - 118.295 1 2027 ARMY 371.706 .000 371.706 - - - - - - - - - - - - - - - - - - - - - - - - 371.706 1 2027 MC (‡) 39.884 .000 39.884 - - - - - - - - - - - - - - - - - - - - - - - - 39.884 1 2027 Total 411.590 .000 411.590 - - - - - - - - - - - - - - - - - - - - - - - - 411.590 O C T N O V D E C J A N LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 50 of 53 S E P O C T N O V D E C J A N F E B P-1 Line #18 - - - 24.425 24.425 24.425 M A R A P R M A Y .000 .000 J U N J U L A U G 74.004 S E P Volume 1 - 520 === page 553 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: ER8021 / PROP CHG, 155mm ARTY MACS, M232 Series [DA67] Fiscal Year 2031 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2030 1 OCT Calendar Year 2031 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2032 M A Y J U N J U L Calendar Year 2032 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 5954876 2 2025 ARMY 276.240 180.240 96.000 32.000 32.000 32.000 2 2025 MC (‡) 34.050 34.050 2 2025 Total 310.290 214.290 96.000 32.000 32.000 32.000 3 2025 ARMY 73.275 73.275 1 2026 ARMY 74.004 .000 74.004 - - 1 2026 MC (‡) 44.291 .000 44.291 - 1 2026 Total 118.295 .000 118.295 1 2027 ARMY 371.706 1 2027 MC (‡) 1 2027 Total .000 - - .000 - .000 - - - - - - - - - 12.000 12.000 34.000 16.004 - - - - 22.145 22.146 - - - - - 34.145 34.146 34.000 16.004 .000 371.706 - - - - - - - - 39.884 .000 39.884 - - - - - - - 411.590 .000 411.590 - - - - - - - - - - - - - - - - - - - - - - .000 .000 .000 O C T N O V D E C J A N LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army F E B M A R A P R - M A Y .000 - .000 - - - - - - - - - - - - - - - - - - - - - 3.670 - - - - - - - - 34.651 34.621 34.621 34.621 34.621 34.621 34.621 34.621 34.621 99.971 J U N J U L A U G UNCLASSIFIED Page 51 of 53 S E P O C T N O V D E C - - - - - - - - - .000 30.981 30.975 30.975 30.975 30.975 30.975 30.975 30.975 30.975 92.925 J A N 3.646 F E B P-1 Line #18 3.646 M A R 3.646 A P R 3.646 M A Y 3.646 J U N 3.646 J U L 3.646 A U G 3.646 7.046 S E P Volume 1 - 521 === page 554 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: ER8021 / PROP CHG, 155mm ARTY MACS, M232 Series [DA67] Fiscal Year 2033 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2032 1 OCT Calendar Year 2033 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2034 M A Y J U N J U L Calendar Year 2034 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 5954876 2 2025 ARMY 276.240 276.240 .000 2 2025 MC (‡) 34.050 34.050 .000 2 2025 Total 310.290 310.290 .000 3 2025 ARMY 73.275 73.275 .000 .000 1 2026 ARMY 74.004 74.004 .000 .000 1 2026 MC (‡) 44.291 44.291 .000 1 2026 Total 118.295 118.295 .000 1 2027 ARMY 371.706 278.781 92.925 30.975 30.975 30.975 1 2027 MC (‡) 39.884 32.838 1 2027 Total 411.590 311.619 99.971 34.621 34.375 30.975 7.046 .000 .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 .000 3.646 O C T - - 3.400 N O V - - - - - - - - - - - - - - - - - - - - - .000 D E C .000 .000 J A N LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 52 of 53 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G - .000 S E P Volume 1 - 522 === page 555 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8750E27501 / Artillery Propellants, Fuzes and Primers, All Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 37 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: ER8021 / PROP CHG, 155mm ARTY MACS, M232 Series [DA67] Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 TO BE SELECTED - TO BE SELECTED 30,000 50,000 125,000 6 6 60 66 6 6 60 66 2 GENERAL DYNAMICS-OTS, INC. - HAMPTON, AR 30,000 50,000 125,000 6 6 60 66 6 6 60 66 3 AMERICAN ORDNANCE LLC (IAAAP) MIDDLETOWN, IA 30,000 50,000 125,000 6 6 60 66 6 6 60 66 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 8750E27501 - Artillery Propellants, Fuzes and Primers... Army UNCLASSIFIED Page 53 of 53 P-1 Line #18 Volume 1 - 523 === page 556 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 43: Mines P-1 Line Item Number / Title: 0442EA0800 / Mines & Clearing Charges, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 93.925 42.748 47.012 - 47.012 52.899 53.851 43.762 44.223 - 677.502 677.502 - - - - - - - - - - 93.925 42.748 47.012 - 47.012 52.899 53.851 43.762 44.223 - 677.502 To FY 2031 Complete - - - - - - - - - - 93.925 42.748 47.012 - 47.012 52.899 53.851 43.762 44.223 - Total 1,055.922 1,055.922 1,055.922 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line includes Mines and Mine Clearing Charges, All Types. (E39315) The M18A1 Claymore Mine is used when a directional, fixed, fragmentation mine is required for the defense of bivouac areas, outposts, and against infiltration tactics. It is also used against thin-skinned vehicles. This item is Code A, approved for service use. (E72194) The M88 Volcano Practice Mine canister contains an explosive expulsion charge and six inert weighted simulants for the M87 & M87A1 tactical mines. The use of four M88 canisters in the four corners of the M139 Volcano System provide Warfighters a live fire effect by expelling the six inert mine simulants, marking the start and end of a training mine field. Firing the M88 expels the six inert mine simulants at the same distance and distributions of density to represent similar emplacement of a tactical obstacle field. The M88 canisters are a one-time use Class V ammo item. This item is Code A, approved for service use. (E72800) The Anti-Personnel Obstacle Breaching System (APOBS) is used by dismounted troops in combat operations to clear a lane through wire obstacles and anti-personnel mines. This item is a lightweight, self-contained, 1 shot expendable system that is transported and deployed by a 2-man team. It consists of a line charge/fuze assembly and a rocket motor assembly. APOBS uses the MK126 Mod 0 rocket motor to propel a line charge over the obstacle. The line is then detonated, clearing a lane. The APOBS System is being actively used in Combat Engineering Operations. This item is Code A, approved for service use. (E75101) M58A4 Linear Demolition Charge, commonly called the Mine Clearing Line Charge (MICLIC), is deployed by the MK22 Mod 4 rocket from a MK155 launcher mounted to a M200A1 trailer or from the M1150 Assault Breacher Vehicle. Once deployed over the target minefield by the rocket, it is command detonated, clearing a vehicle width lane 100 meter long. The MICLIC is effective against single impulse, pressure fuzed mines. The M58A4 is less effective against blast hardened or complex fused mines. The M58A4 is being actively used in Combat Engineering Operations. This item is Code A, approved for service use. (E75102) Line Charge Inert M68A2 F/MICLIC is the training ammunition for the M58 Linear Demolition Charge. It is identical to the M58 except all explosive components have been replaced with non-explosive components of identical weight. It can be recovered after deployment by the MK22 MOD 4 rocket and used up to three times. This item is Code A, approved for service use. (E76900) The MK22 rocket is used to deploy the M58 Linear Demolition Charge or the M68A2 Inert Line Charge over a target obstacle. One rocket is used with each M58 and up to 3 can be used with each M68A2. This item is Code A, approved for service use. LI 0442EA0800 - Mines & Clearing Charges, All Types Army UNCLASSIFIED Page 1 of 24 P-1 Line #19 Volume 1 - 524 === page 557 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 43: Mines P-1 Line Item Number / Title: 0442EA0800 / Mines & Clearing Charges, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 E39315 / MINE, AP M18A1 w/Non-Elec Ignition System P-5a A - / 21.070 P-5 E72194 / MINE, Practice, M88 (VOLCANO) [K042] P-5a A - / 44.901 P-5 E72800 / Anti-Pers Obstacle Breachng Sys(APOBS), MK7 w/Mods [MN79] P-5a, P-21 A - / 189.541 P-5 E75101 / Line Charge, M58 Series Mine Clearing f/MICLIC [M913] P-5a A - / 214.862 P-5 E75102 / LINE CHARGE INERT M68A2 F/MICLIC [M914] P-5a A - P-5 E76900 / ROCKET, Motor 5 in, MK22 MOD 4 f/MICLIC [J143] P-5a A P-40 Total Gross/Weapon System Cost - / 3.423 - / 1.643 - / 3.237 - / - - / 3.237 / - - / 2.177 - / 2.245 - / - - / 2.245 - / 17.423 - / 26.555 - / 27.404 - / - - / 27.404 - / 38.471 - / 3.068 - / 13.229 - / - - / 13.229 / 81.388 - / 8.177 - / 0.487 - / 0.002 - / - - / 0.002 - / 125.740 - / 26.431 - / 8.818 - / 0.895 - / - - / 0.895 - / 677.502 - / 93.925 - / 42.748 - / 47.012 - / - - / 47.012 - *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Base Budget supports critical Army Title 10 war reserve/operational, training, and test requirements IAW DoDI 3000.04 (Munitions Requirements Process) and AR 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War (OSW)-approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. The FY 2027 Total Base dollars in the amount of $47.012 million supports the procurement of 6 variants of Mines and Mine Clearing Charges. (E39315) MINE, AP M18A1 w/Non-Elec Ignition System This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $3.237 million supports production of 7,069 Claymores. Type Classification Date: 1960 (E72194) Practice M88 Volcano - This is a training standard item used in functional training. FY 2027 request supports annual training builds war reserve inventory in accordance with the Army's procurement goal. FY 2027 Base procurement dollars in the amount of $2.245 million supports production of 267 M88 Practice Mine Canisters. Type Classification Date: 1989 (E72800) Anti-Personnel Obstacle Breaching Sys (APOBS) This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $27.404 million supports the procurement of 1,231 APOBS. Rocket Motor Grains and PBXN-10 explosive are provided as Government Furnished Material. Naval Surface Warfare Center Indian Head produces rocket motor grains. PBXN-10 is currently sourced from Holston Army Ammunition Plant. Type Classification Date: 2001 (E75101) Mine Clearing Line Charge M58 Series (MICLIC) LI 0442EA0800 - Mines & Clearing Charges, All Types Army UNCLASSIFIED Page 2 of 24 P-1 Line #19 Volume 1 - 525 === page 558 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 43: Mines ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 0442EA0800 / Mines & Clearing Charges, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $13.229 million supports the procurement of 25 MICLICs and the recapitalization of 700 M58A4s to update stocks with new electronic safe and arm device (ESAD) fuzes to address persistent detonation reliability issues. Load Assembly Pack (LAP) is conducted by American Ordnance at Iowa Army Ammunition Plant. C4 explosive is provided as Government Furnished Material and sourced from Holston Army Ammunition Plant. Type Classification Date: 1985 (E75102) Line Charge Inert M68A2 F/MICLIC This is a training standard item used in training and combat. FY 2027 Base procurement dollars in the amount of $0.002 million supports engineering for items in production. Type Classification Date: 1985 (E76900) MICLIC 5 In Rocket Motor MK 22 MOD 4 - This is a training standard item used in training and combat. FY 2027 Base procurement dollars in the amount of $0.895 million supports engineering for items in production. Type Classification Date: 1985 LI 0442EA0800 - Mines & Clearing Charges, All Types Army UNCLASSIFIED Page 3 of 24 P-1 Line #19 Volume 1 - 526 === page 559 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0442EA0800 / Mines & Clearing Charges, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 43 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E39315 / MINE, AP M18A1 w/Non-Elec Ignition System MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 21.070 3.423 1.643 3.237 - 3.237 - - - - - - 21.070 3.423 1.643 3.237 - 3.237 - - - - - - 21.070 3.423 1.643 3.237 - 3.237 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, (†) PACK (LAP) COMP C-4 CLASS 3 (†) 230.03 77,945 17.930 245.47 9,837 2.415 277.18 2,869 0.795 286.86 7,069 2.028 - - - 286.86 7,069 2.028 17.96 136,674 2.455 19.00 10,946 0.208 19.40 4,733 0.092 19.80 11,663 0.231 - - - 19.80 11,663 0.231 Subtotal: Recurring Cost - - 20.384 - - 2.623 - - 0.887 - - 2.259 - - - - - 2.259 - - 20.384 - - 2.623 - - 0.887 - - 2.259 - - - - - 2.259 Production Engineering - - 0.686 - - 0.779 - - 0.750 - - 0.978 - - - - - 0.978 Subtotal: Support Production Engineering Cost - - 0.686 - - 0.779 - - 0.750 - - 0.978 - - - - - 0.978 Subtotal: Hardware Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - - - - 0.021 - - 0.006 - - - - - - - - - Subtotal: Support - Quality Assurance Cost - - - - - 0.021 - - 0.006 - - - - - - - - - Gross/Weapon System Cost - - 21.070 - - 3.423 - - 1.643 - - 3.237 - - - - - 3.237 Remarks: FY 2026 to FY 2027 funding increase reflects procurement of ammunition needed to meet training and depot level requirements. FY 2026 to FY 2027 unit price increase is due to current contract pricing matrix negotiated with vendor. LI 0442EA0800 - Mines & Clearing Charges, All Types Army UNCLASSIFIED Page 4 of 24 P-1 Line #19 Volume 1 - 527 === page 560 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 43 P-1 Line Item Number / Title: 0442EA0800 / Mines & Clearing Charges, All Types ID Code (A=Service Ready, B=Not Service Ready) : A (†) Item Number / Title [DODIC]: E39315 / MINE, AP M18A1 w/Non-Elec Ignition System MDAP/MAIS Code: indicates the presence of a P-5a LI 0442EA0800 - Mines & Clearing Charges, All Types Army UNCLASSIFIED Page 5 of 24 P-1 Line #19 Volume 1 - 528 === page 561 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 43 Cost Elements LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) COMP C-4 CLASS 3 COMP C-4 CLASS 3 COMP C-4 CLASS 3 O O C P-1 Line Item Number / Title: 0442EA0800 / Mines & Clearing Charges, All Types Method/Type or Funding Vehicle Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 ACCURATE ENERGETIC SYSTEMS, LLC / MC EWEN, TN Option / FFP ROCK ISLAND ARSENAL, IL May 2025 Sep 2026 9,837 245.47 Y 2026 ACCURATE ENERGETIC SYSTEMS, LLC / MC EWEN, TN Option / FFP ROCK ISLAND ARSENAL, IL May 2026 Sep 2027 2,869 277.18 Y 2027 ACCURATE ENERGETIC SYSTEMS, LLC / MC EWEN, TN Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Jun 2028 7,069 286.86 Y 2025 BAE SYSTEMS ORDNANCE SYSTEMS / KINGSPORT, TN C / FFP ROCK ISLAND ARSENAL, IL Jun 2025 Jun 2026 10,946 19.00 Y 2026 BAE SYSTEMS ORDNANCE SYSTEMS / KINGSPORT, TN Option / FFP ROCK ISLAND ARSENAL, IL Jun 2026 Jun 2027 4,733 19.40 Y 2027 TO BE SELECTED / TO BE SELECTED Option / FFP ROCK ISLAND ARSENAL, IL Jun 2027 Jun 2028 11,663 19.80 Y LI 0442EA0800 - Mines & Clearing Charges, All Types Army Location of PCO Award Date Item Number / Title [DODIC]: E39315 / MINE, AP M18A1 w/Non-Elec Ignition System UNCLASSIFIED Page 6 of 24 P-1 Line #19 (Each) RFP Issue Date Volume 1 - 529 === page 562 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0442EA0800 / Mines & Clearing Charges, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 43 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E72194 / MINE, Practice, M88 (VOLCANO) [K042] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 44.901 - 2.177 2.245 - 2.245 - - - - - - 44.901 - 2.177 2.245 - 2.245 - - - - - - 44.901 - 2.177 2.245 - 2.245 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE 7,096 36.524 - - - - - 36.524 - - - - - 36.524 - - - First Article Test - - 0.139 - - Acceptance Test - - 0.110 - - Subtotal: Support Acceptance Testing Cost - - 0.249 - ROUND (†) 5,147.12 Subtotal: Recurring Cost Subtotal: Hardware Cost 5,665.00 283 1.603 - - 1.603 - - 1.603 - - - - - - - - - - 5,782.43 267 1.544 - - - - - 1.544 - - - - - 1.544 - - - - - - - - - 0.055 - - 0.056 - - 0.055 - - 0.056 - 5,782.43 267 1.544 - - 1.544 - - 1.544 - - - - - - - 0.056 - - - - 0.056 Support - Acceptance Testing Cost Support - Production Engineering Cost Production Engineering - - 8.128 - - - - - 0.519 - - 0.645 - - - - - 0.645 Subtotal: Support Production Engineering Cost - - 8.128 - - - - - 0.519 - - 0.645 - - - - - 0.645 Gross/Weapon System Cost - - 44.901 - - - - - 2.177 - - 2.245 - - - - - 2.245 (†) indicates the presence of a P-5a LI 0442EA0800 - Mines & Clearing Charges, All Types Army UNCLASSIFIED Page 7 of 24 P-1 Line #19 Volume 1 - 530 === page 563 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 43 Cost Elements COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 0442EA0800 / Mines & Clearing Charges, All Types Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: E72194 / MINE, Practice, M88 (VOLCANO) [K042] Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 TO BE SELECTED / TO BE SELECTED C / FFP PICATINNY ARSENAL, NJ May 2027 Aug 2028 283 5,665.00 Y 2027 TO BE SELECTED / TO BE SELECTED C / FFP PICATINNY ARSENAL, NJ May 2027 Aug 2028 267 5,782.43 Y (Each) RFP Issue Date Remarks: New contract award planned for May 2027. The use of FY 2026 and FY 2027 on the base award will produce a more economical unit cost. LI 0442EA0800 - Mines & Clearing Charges, All Types Army UNCLASSIFIED Page 8 of 24 P-1 Line #19 Volume 1 - 531 === page 564 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0442EA0800 / Mines & Clearing Charges, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 43 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E72800 / Anti-Pers Obstacle Breachng Sys(APOBS), MK7 w/Mods [MN79] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 17.423 26.555 27.404 - 27.404 - Gross/Weapon System Cost ($ in Millions) 189.541 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 189.541 Plus CY Advance Procurement ($ in Millions) - - - - - 17.423 26.555 27.404 - 27.404 - Total Obligation Authority ($ in Millions) 189.541 FY 2027 Total - - - - - 17.423 26.555 27.404 - 27.404 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, (†) PACK (LAP) 24,734.06 6,241 154.365 14,142.98 944 13.351 14,969.26 1,364 20.418 16,840.50 1,231 20.731 - - - 16,840.50 1,231 20.731 (†) 28.15 15,599 0.439 31.53 2,360 0.074 33.06 4,092 0.135 34.75 3,693 0.128 - - - 34.75 3,693 0.128 (†) 23.92 303,537 7.261 18.34 47,200 0.866 23.46 75,020 1.760 24.65 67,705 1.669 - - - 24.65 67,705 1.669 555.65 6,663 3.702 694.36 1,133 0.787 632.98 1,704 1.079 709.49 1,538 1.091 - - - 709.49 1,538 1.091 - - 165.767 - - 15.078 - - 23.392 - - 23.619 - - - - - 23.619 - - 165.767 - - 15.078 - - 23.392 - - 23.619 - - - - - 23.619 First Article Test - - 1.159 - - - - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 1.159 - - - - - - - - - - - - - - - - - 0.600 - - - - - - - - - - - - - - - - - 0.600 - - - - - - - - - - - - - - - PBXN-10 TYPE 2 PBXN-10 TYPE 1 PROPELLANT GRAIN (†) (ROCKET) Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Engineering Change Proposals Cost Engineering Change Proposals Subtotal: Support Engineering Change Proposals Cost Support - Product Improvement Cost LI 0442EA0800 - Mines & Clearing Charges, All Types Army UNCLASSIFIED Page 9 of 24 P-1 Line #19 Volume 1 - 532 === page 565 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0442EA0800 / Mines & Clearing Charges, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 43 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E72800 / Anti-Pers Obstacle Breachng Sys(APOBS), MK7 w/Mods [MN79] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Production Qualification Test - - 0.694 - - - - - - - - - - - - - - - Production Verification Test - - 0.564 - - - - - - - - - - - - - - - Subtotal: Support - Product Improvement Cost - - 1.258 - - - - - - - - - - - - - - - Production Engineering - - 10.628 - - 2.333 - - 3.150 - - 3.769 - - - - - 3.769 Subtotal: Support Production Engineering Cost - - 10.628 - - 2.333 - - 3.150 - - 3.769 - - - - - 3.769 Quality Assurance - - 10.059 - - 0.012 - - 0.013 - - 0.016 - - - - - 0.016 Subtotal: Support - Quality Assurance Cost - - 10.059 - - 0.012 - - 0.013 - - 0.016 - - - - - 0.016 Support - Production Engineering Cost Support - Quality Assurance Cost Support - Staging and Transportation Cost Staging and Transportation - - 0.070 - - - - - - - - - - - - - - - Subtotal: Support - Staging and Transportation Cost - - 0.070 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 189.541 - - 17.423 - - 26.555 - - 27.404 - - - - - 27.404 Remarks: FY 2026 to FY 2027 funding increase reflects procurement of ammunition needed to meet training and depot level requirements. FY 2027 will be the first year of procurement on a new contract. (†) indicates the presence of a P-5a LI 0442EA0800 - Mines & Clearing Charges, All Types Army UNCLASSIFIED Page 10 of 24 P-1 Line #19 Volume 1 - 533 === page 566 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 43 O O C Cost Elements LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) LOAD, ASSEMBLE, PACK (LAP) (†) PBXN-10 TYPE 2 PBXN-10 TYPE 2 PBXN-10 TYPE 2 PBXN-10 TYPE 1 PBXN-10 TYPE 1 PBXN-10 TYPE 1 PROPELLANT GRAIN (ROCKET) PROPELLANT GRAIN (ROCKET) PROPELLANT GRAIN (ROCKET) (†) P-1 Line Item Number / Title: 0442EA0800 / Mines & Clearing Charges, All Types FY Contractor and Location Method/Type or Funding Vehicle 2025 NAMMO PERRY INC. / PERRY, FL C / FFP ROCK ISLAND ARSENAL, IL Sep 2025 May 2027 944 14,142.98 Y 2026 NAMMO PERRY INC. / PERRY, FL C / FFP ROCK ISLAND ARSENAL, IL Mar 2026 May 2028 1,364 14,969.26 Y 2027 TO BE SELECTED / TO BE SELECTED C / FFP ROCK ISLAND ARSENAL, IL May 2027 May 2029 1,231 16,840.50 Y 2025 BAE SYSTEMS ORDNANCE SYSTEMS / KINGSPORT, TN C / FFP ROCK ISLAND ARSENAL, IL Sep 2025 May 2026 2,360 31.53 Y 2026 BAE SYSTEMS ORDNANCE SYSTEMS / KINGSPORT, TN Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 4,092 33.06 Y 2027 TO BE SELECTED / TO BE SELECTED C / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 3,693 34.75 Y 2025 BAE SYSTEMS ORDNANCE SYSTEMS / KINGSPORT, TN C / FFP ROCK ISLAND ARSENAL, IL Sep 2025 May 2026 47,200 18.34 Y 2026 BAE SYSTEMS ORDNANCE SYSTEMS / KINGSPORT, TN Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Sep 2027 75,020 23.46 Y 2027 TO BE SELECTED / TO BE SELECTED C / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 67,705 24.65 Y 2025 Naval Surface Warfare Center / Indian Head, MD PO ROCK ISLAND ARSENAL, IL Dec 2025 May 2026 1,133 694.36 Y 2026 Naval Surface Warfare Center / Indian Head, MD PO ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 1,704 632.98 Y 2027 TO BE SELECTED / TO BE SELECTED C / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 1,538 709.49 Y Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: E72800 / Anti-Pers Obstacle Breachng Sys(APOBS), MK7 w/Mods [MN79] Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date indicates the presence of a P-21 LI 0442EA0800 - Mines & Clearing Charges, All Types Army UNCLASSIFIED Page 11 of 24 P-1 Line #19 Volume 1 - 534 === page 567 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0442EA0800 / Mines & Clearing Charges, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 43 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E72800 / Anti-Pers Obstacle Breachng Sys(APOBS), MK7 w/Mods [MN79] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 6241 1 2025 ARMY 944 0 944 1 2026 ARMY 1,364 0 1,364 A - - - - - - - - - - - - - 944 A - - - - - - - 1,364 2 2027 ARMY 1,231 0 1,231 2 2027 MC (‡) 75 0 75 75 2 2027 Total 1,306 0 1,306 1,306 1,231 O C T N O V D E C J A N LI 0442EA0800 - Mines & Clearing Charges, All Types Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #19 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 535 === page 568 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0442EA0800 / Mines & Clearing Charges, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 43 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E72800 / Anti-Pers Obstacle Breachng Sys(APOBS), MK7 w/Mods [MN79] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 6241 1 2025 ARMY 944 0 944 - - - - - - - 79 79 79 79 79 79 79 79 79 79 79 75 1 2026 ARMY 1,364 0 1,364 - - - - - - - - - - - - - - - - - - - 113 120 113 113 113 792 2 2027 ARMY 1,231 0 1,231 A - - - - - - - - - - - - - - - - - 1,231 2 2027 MC (‡) 75 0 75 A - - - - - - - - - - - - - - - - - 75 2 2027 Total 1,306 0 1,306 - - - - - - - - - - - - - - - - - 1,306 O C T N O V D E C J A N LI 0442EA0800 - Mines & Clearing Charges, All Types Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #19 M A R A P R 0 M A Y J U N J U L A U G S E P Volume 1 - 536 === page 569 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0442EA0800 / Mines & Clearing Charges, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 43 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E72800 / Anti-Pers Obstacle Breachng Sys(APOBS), MK7 w/Mods [MN79] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P LOAD, ASSEMBLE, PACK (LAP) Prior Years Deliveries: 6241 1 2025 ARMY 944 944 0 1 2026 ARMY 1,364 572 792 113 113 113 113 113 113 113 1 0 2 2027 ARMY 1,231 0 1,231 - - - - - - - 109 102 102 102 102 102 102 102 102 102 102 102 2 2027 MC (‡) 75 0 75 - - - - - - - 9 6 6 6 6 6 6 6 6 6 6 6 2 2027 Total 1,306 0 1,306 - - - - - - - 118 108 108 108 108 108 108 108 108 108 108 108 M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R O C T N O V D E C J A N LI 0442EA0800 - Mines & Clearing Charges, All Types Army F E B M A R A P R 0 UNCLASSIFIED Page 14 of 24 P-1 Line #19 0 0 M A Y J U N J U L A U G S E P Volume 1 - 537 0 === page 570 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 0442EA0800 / Mines & Clearing Charges, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 43 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E72800 / Anti-Pers Obstacle Breachng Sys(APOBS), MK7 w/Mods [MN79] Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 NAMMO PERRY INC. PERRY, FL 25 130 576 8 8 24 32 6 6 18 24 2 TO BE SELECTED - TO BE SELECTED 50 130 400 8 8 24 32 6 6 18 24 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 0442EA0800 - Mines & Clearing Charges, All Types Army UNCLASSIFIED Page 15 of 24 P-1 Line #19 Volume 1 - 538 === page 571 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0442EA0800 / Mines & Clearing Charges, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 43 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E75101 / Line Charge, M58 Series Mine Clearing f/MICLIC [M913] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 38.471 3.068 13.229 - 13.229 - Gross/Weapon System Cost ($ in Millions) 214.862 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 214.862 Plus CY Advance Procurement ($ in Millions) - - - - - 38.471 3.068 13.229 - 13.229 - Total Obligation Authority ($ in Millions) 214.862 FY 2027 Total - - - - - 38.471 3.068 13.229 - 13.229 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, (†) PACK (LAP) 26,949.10 ESAD FUZE (FOR - (†) MICLIC) COMP C-4 CLASS 5,876 - 158.353 - 33,149.21 419 13.890 14,917.50 419 6.250 581,559 54,949.83 28 1.539 57,771.62 25 1.444 - - - 57,771.62 25 1.444 - - - 14,917.50 25 0.373 - - - 14,917.50 25 0.373 11.050 19.40 51,852 1.006 19.80 46,296 0.917 - - - 19.80 46,296 0.917 7,084.49 28 0.198 - - - - - - - - - - - 2.734 - - - - - 2.734 700 10.000 - - - 700 10.000 18.20 1,783,445 32.452 19.00 6,627.83 986 6.535 - - - - - 197.347 - - 31.190 - - 2.743 Fuze Recapitalization Effort - - - - - - - - - Subtotal: Non Recurring Cost - - - - - - - - - - - 10.000 - - - - - 10.000 - - 197.347 - - 31.190 - - 2.743 - - 12.734 - - - - - 12.734 Acceptance Test - - 0.071 - - 0.039 - - 0.010 - - 0.016 - - - - - 0.016 First Article Test - - 0.200 - - - - - 0.097 - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 0.271 - - 0.039 - - 0.107 - - 0.016 - - - - - 0.016 3 (†) FUZE, DEMOLITION KIT: M1134A4 (FOR (†) MICLIC) Subtotal: Recurring Cost Non Recurring Cost Subtotal: Hardware Cost 14,285.71 14,285.71 Support - Acceptance Testing Cost LI 0442EA0800 - Mines & Clearing Charges, All Types Army UNCLASSIFIED Page 16 of 24 P-1 Line #19 Volume 1 - 539 === page 572 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0442EA0800 / Mines & Clearing Charges, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 43 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E75101 / Line Charge, M58 Series Mine Clearing f/MICLIC [M913] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Support - Product Improvement Cost Production Verification Test - - 2.342 - - 2.214 - - - - - - - - - - - - Subtotal: Support - Product Improvement Cost - - 2.342 - - 2.214 - - - - - - - - - - - - Production Engineering - - 14.898 - - 5.025 - - 0.216 - - 0.479 - - - - - 0.479 Subtotal: Support Production Engineering Cost - - 14.898 - - 5.025 - - 0.216 - - 0.479 - - - - - 0.479 Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.011 - - 0.003 - - 0.003 - - - - - - - - - Subtotal: Support - Quality Assurance Cost - - 0.011 - - 0.003 - - 0.003 - - - - - - - - - Gross/Weapon System Cost - - 214.862 - - 38.471 - - 3.068 - - 13.229 - - - - - 13.229 Remarks: FY 2026 to FY 2027 funding increase reflects procurement of ammunition needed to meet training and depot level requirements. FY 2026 to FY 2027 unit cost increases due to risk associated with a new contract. $10M of FY27 funding is for the costs related to the Fuze Recapitalization effort. Costs for the new ESAD Fuze are estimates at this point and could fluctuate until the steady production process and acquisition strategy are established. FY 2025 include costs to be incurred related to the Non-Recurring Engineering (NRE) effort of qualifying a reliable and producible replacement Fuze for the M58 MICLIC Line Charge. (†) indicates the presence of a P-5a LI 0442EA0800 - Mines & Clearing Charges, All Types Army UNCLASSIFIED Page 17 of 24 P-1 Line #19 Volume 1 - 540 === page 573 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 43 Cost Elements LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) ESAD FUZE (FOR MICLIC) ESAD FUZE (FOR MICLIC) COMP C-4 CLASS 3 COMP C-4 CLASS 3 COMP C-4 CLASS 3 FUZE, DEMOLITION KIT: M1134A4 (FOR MICLIC) O O C P-1 Line Item Number / Title: 0442EA0800 / Mines & Clearing Charges, All Types Method/Type or Funding Vehicle Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2025 AMERICAN ORDNANCE LLC (IAAAP) / MIDDLETOWN, IA Option / FFP ROCK ISLAND ARSENAL, IL Jan 2026 May 2027 419 33,149.21 Y 2026 AMERICAN ORDNANCE LLC (IAAAP) / MIDDLETOWN, IA Option / FFP ROCK ISLAND ARSENAL, IL May 2026 May 2028 28 54,949.83 Y 2027 TO BE SELECTED / TO BE SELECTED Option / FFP ROCK ISLAND ARSENAL, IL May 2027 Nov 2028 25 57,771.62 Y 2025 TO BE SELECTED / TO BE SELECTED C / FFP ROCK ISLAND ARSENAL, IL Sep 2026 May 2027 419 14,917.50 N 2027 TO BE SELECTED / TO BE SELECTED Option / FFP ROCK ISLAND ARSENAL, IL Jun 2027 Jul 2028 25 14,917.50 N 2025 BAE SYSTEMS ORDNANCE SYSTEMS / KINGSPORT, TN Option / FFP ROCK ISLAND ARSENAL, IL Jan 2026 Apr 2026 581,559 19.00 Y 2026 BAE SYSTEMS ORDNANCE SYSTEMS / KINGSPORT, TN Option / FFP ROCK ISLAND ARSENAL, IL Jun 2026 Sep 2026 51,852 19.40 Y 2027 TO BE SELECTED / TO BE SELECTED Option / FFP ROCK ISLAND ARSENAL, IL Jun 2027 Sep 2027 46,296 19.80 Y 2026 TO BE SELECTED / TO BE SELECTED Option / FFP ROCK ISLAND ARSENAL, IL Jun 2026 Jun 2027 28 7,084.49 Y LI 0442EA0800 - Mines & Clearing Charges, All Types Army Location of PCO Award Date Item Number / Title [DODIC]: E75101 / Line Charge, M58 Series Mine Clearing f/MICLIC [M913] UNCLASSIFIED Page 18 of 24 P-1 Line #19 (Each) RFP Issue Date Volume 1 - 541 === page 574 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0442EA0800 / Mines & Clearing Charges, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 43 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E75102 / LINE CHARGE INERT M68A2 F/MICLIC [M914] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 81.388 8.177 0.487 0.002 - 0.002 - - - - - - 81.388 8.177 0.487 0.002 - 0.002 - - - - - - 81.388 8.177 0.487 0.002 - 0.002 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE 977 41.292 - - 41.292 - - 41.292 First Article Test - - Subtotal: Support Acceptance Testing Cost - Production Engineering Subtotal: Support Production Engineering Cost ROUND (†) 42,264.04 Subtotal: Recurring Cost Subtotal: Hardware Cost 40,896.20 165 6.748 - - - - - - - - - - - - - - 6.748 - - - - - - - - - - - - - - 6.748 - - - - - - - - - - - - 0.250 - - - - - - - - - - - - - - - - 0.250 - - - - - - - - - - - - - - - - - 39.828 - - 1.429 - - 0.487 - - 0.002 - - - - - 0.002 - - 39.828 - - 1.429 - - 0.487 - - 0.002 - - - - - 0.002 Support - Acceptance Testing Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.018 - - - - - - - - - - - - - - - Subtotal: Support - Quality Assurance Cost - - 0.018 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 81.388 - - 8.177 - - 0.487 - - 0.002 - - - - - 0.002 Remarks: FY 2026 to FY 2027 funding decrease reflects decreased engineering costs needed to support program in FY 2027. LI 0442EA0800 - Mines & Clearing Charges, All Types Army UNCLASSIFIED Page 19 of 24 P-1 Line #19 Volume 1 - 542 === page 575 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 43 P-1 Line Item Number / Title: 0442EA0800 / Mines & Clearing Charges, All Types ID Code (A=Service Ready, B=Not Service Ready) : A (†) Item Number / Title [DODIC]: E75102 / LINE CHARGE INERT M68A2 F/MICLIC [M914] MDAP/MAIS Code: indicates the presence of a P-5a LI 0442EA0800 - Mines & Clearing Charges, All Types Army UNCLASSIFIED Page 20 of 24 P-1 Line #19 Volume 1 - 543 === page 576 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 43 Cost Elements COMPLETE ROUND O O C FY Contractor and Location 2025 AMERICAN ORDNANCE LLC (IAAAP) / MIDDLETOWN, IA LI 0442EA0800 - Mines & Clearing Charges, All Types Army P-1 Line Item Number / Title: 0442EA0800 / Mines & Clearing Charges, All Types Method/Type or Funding Vehicle Option / FFP Location of PCO ROCK ISLAND ARSENAL, IL UNCLASSIFIED Page 21 of 24 Award Date Date of First Delivery Aug 2025 Jun 2027 P-1 Line #19 Item Number / Title [DODIC]: E75102 / LINE CHARGE INERT M68A2 F/MICLIC [M914] Qty (Each) 165 Specs Date Unit Cost Avail Revision Now? Available ($) 40,896.20 RFP Issue Date Y Volume 1 - 544 === page 577 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0442EA0800 / Mines & Clearing Charges, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 43 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E76900 / ROCKET, Motor 5 in, MK22 MOD 4 f/MICLIC [J143] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 26.431 8.818 0.895 - 0.895 - Gross/Weapon System Cost ($ in Millions) 125.740 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 125.740 Plus CY Advance Procurement ($ in Millions) - - - - - 26.431 8.818 0.895 - 0.895 - Total Obligation Authority ($ in Millions) 125.740 FY 2027 Total - - - - - 26.431 8.818 0.895 - 0.895 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, PACK (LAP) 14,955.26 1,670 24.975 - - - - - - - - - - - - - - - PROPELLANT N-5 15.93 133,622 2.129 - - - - - - - - - - - - - - - EC INHIBITING TAPE 61.35 2,332 0.143 - - - - - - - - - - - - - - - 42,244.21 803 33.922 492 25.293 148 7.768 - - - - - - - - - - - 61.169 - - 25.293 - - 7.768 - - - - - - - - - - - 61.169 - - 25.293 - - 7.768 - - - - - - - - - First Article Test - - 0.090 - - - - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 0.090 - - - - - - - - - - - - - - - Production Engineering - - 64.465 - - 1.138 - - 1.043 - - 0.882 - - - - - 0.882 Subtotal: Support Production Engineering Cost - - 64.465 - - 1.138 - - 1.043 - - 0.882 - - - - - 0.882 Quality Assurance - - 0.016 - - - - - 0.007 - - 0.013 - - - - - 0.013 Subtotal: Support - Quality Assurance Cost - - 0.016 - - - - - 0.007 - - 0.013 - - - - - 0.013 COMPLETE ROUND (†) Subtotal: Recurring Cost Subtotal: Hardware Cost 51,407.82 52,487.39 Support - Acceptance Testing Cost Support - Production Engineering Cost Support - Quality Assurance Cost LI 0442EA0800 - Mines & Clearing Charges, All Types Army UNCLASSIFIED Page 22 of 24 P-1 Line #19 Volume 1 - 545 === page 578 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 0442EA0800 / Mines & Clearing Charges, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 43 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E76900 / ROCKET, Motor 5 in, MK22 MOD 4 f/MICLIC [J143] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Gross/Weapon System Cost Unit Cost ($) - FY 2025 Total Cost Qty (Each) ($ M) - 125.740 Unit Cost ($) - FY 2026 Total Cost Qty (Each) ($ M) - 26.431 Unit Cost ($) - FY 2027 Base Total Cost Qty (Each) ($ M) - 8.818 Unit Cost ($) - FY 2027 OOC Total Cost Qty (Each) ($ M) - 0.895 Unit Cost ($) - FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) - ($) - - Total Cost Qty (Each) ($ M) - 0.895 Remarks: FY 2026 to FY 2027 funding decrease reflects decreased engineering costs needed to support program in FY 2027. (†) indicates the presence of a P-5a LI 0442EA0800 - Mines & Clearing Charges, All Types Army UNCLASSIFIED Page 23 of 24 P-1 Line #19 Volume 1 - 546 === page 579 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 43 Cost Elements COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 0442EA0800 / Mines & Clearing Charges, All Types Method/Type or Funding Vehicle Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 Naval Surface Warfare Center / Indian Head, MD PO ROCK ISLAND ARSENAL, IL Oct 2025 Oct 2027 492 51,407.82 Y 2026 Naval Surface Warfare Center / Indian Head, MD PO ROCK ISLAND ARSENAL, IL May 2026 May 2028 148 52,487.39 Y LI 0442EA0800 - Mines & Clearing Charges, All Types Army Location of PCO Award Date Item Number / Title [DODIC]: E76900 / ROCKET, Motor 5 in, MK22 MOD 4 f/MICLIC [J143] UNCLASSIFIED Page 24 of 24 P-1 Line #19 (Each) RFP Issue Date Volume 1 - 547 === page 580 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 43: Mines ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0612E76740 / Close Terrain Shaping Obstacle Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 31.283 39.283 7.860 - - - - - 29.882 30.523 - - - - - - - - - - - - 31.283 39.283 7.860 - - - - - 29.882 30.523 - - - - - - - - - - - - 31.283 39.283 7.860 - - - - - 29.882 30.523 - Total 138.831 138.831 138.831 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: This budget line includes Close Terrain Shaping Obstacle, All Types. (F76740) The XM343 Standoff Activated Volcano Obstacle (SAVO) meets the requirements of United States Army Europe (USAREUR) Operational Needs Statement (ONS) 18-22702. It provides a new delivery capability for fielded Volcano mine canisters utilizing initiation systems, which are the M7 Spider Networked Munition System, the MK152/M156 Remote Activation Munition Systems (RAMS), the CD450-4J Blasting Machine, or the XM204 Interim Top Attack. The primary item is the SAVO base plate which is placed on the ground and has four ports to connect the Volcano canisters and electrical terminals for wires to connect to the selected initiation system for manual initiation. The base plate is packaged with ancillary components to aid in emplacement such as initiation wire, stabilizing ground stakes, sandbags, and canister carrying straps. This item provides a U.S. Anti-Personnel Landmine Policy compliant capability to address the Army's directed close tactical obstacle capability gap and has been identified as part of the Army Modernization priorities in support of the National Defense Strategy. This item is Code A, approved for service use. SAVO Full Task Trainer (FTT) will reflect the form, fit, function, and weight of the tactical XM343 SAVO base plate. FTT will produce sight and sound effects, upon receipt of a launch signal from a fielded initiation system, which effectively represents the XM343 SAVO obstacle's mine launch and armed status functionality. The SAVO Trainers will include the same packaging and ancillary components as the tactical SAVO. The SAVO Partial Task Trainer (PTT) will reflect the same form, fit and weight of tactical XM343 SAVO base plate and can be utilized in conjunction with the SAVO FTT for a more wide-scale collective training experience at Home Station and the Combat Training Centers. This item is Code A, approved for service use. Justification: Procurement supports critical Army Title 10 war reserve/operational, training, and test requirements in accordance with DoDI 3000.04 (Munitions Requirements Process) and AR 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War (OSW)-approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life-cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. (F76740) Standoff Activated Volcano Obstacle (SAVO), XM343 - This is a training standard item used in training and combat. The request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. There is no FY 2027 budget request for this item. LI 0612E76740 - Close Terrain Shaping Obstacle Army UNCLASSIFIED Page 1 of 2 P-1 Line #20 Volume 1 - 548 === page 581 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 43: Mines ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 0612E76740 / Close Terrain Shaping Obstacle Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Type Classification Date: N/A LI 0612E76740 - Close Terrain Shaping Obstacle Army UNCLASSIFIED Page 2 of 2 P-1 Line #20 Volume 1 - 549 === page 582 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 43: Mines P-1 Line Item Number / Title: 7920E72501 / MINE, AT, VOLCANO, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 0.501 - 4.026 - 4.026 5.029 - - - - 9.556 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 0.501 - 4.026 - 4.026 5.029 - - - - 9.556 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 0.501 - 4.026 - 4.026 5.029 - - - - 9.556 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: (E72501) The M87A1 Volcano Tactical Mine canister contains an aluminum tube and breech assembly containing six antitank tactical mines. The canister contains six transmitter coils, attached to a dispersion strap, and a propulsion system. The M87A1 Volcano canister provides Maneuver Commander with a situational tactical Anti-Vehicular (AV) obstacle capability. This item provides a U.S. Anti-Personnel Landmine Policy compliant capability. The M87A1 is a force multiplier, enabling joint forces to fight outnumbered & win against peer enemies while reducing friendly casualties. The M87A1 canister is a onetime use class V ammunition item. This item is Code A, approved for service use. Justification: Base Budget supports critical Army Title 10 war reserve/operational, training, and test requirements IAW DoD Instruction 3000.04 (Munitions Requirements Process) and AR 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support OSW-approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. (E94000) MINE, AT, VOLCANO, All Types This is a war reserve item used in combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base Procurement dollars in the amount of $4.026 million addresses the M87A1 obsolescence to restart production after 20 year plus dormancy. Type Classification Date: 24 Mar 1997 LI 7920E72501 - MINE, AT, VOLCANO, All Types Army UNCLASSIFIED Page 1 of 1 P-1 Line #21 Volume 1 - 550 === page 583 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 45: Rockets P-1 Line Item Number / Title: 2348EA4000 / Shoulder Launched Munitions, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 78.791 34.922 50.235 - 50.235 55.934 61.295 61.489 62.155 - 769.924 769.924 - - - - - - - - - - 78.791 34.922 50.235 - 50.235 55.934 61.295 61.489 62.155 - 769.924 To FY 2031 Complete - - - - - - - - - - 78.791 34.922 50.235 - 50.235 55.934 61.295 61.489 62.155 - Total 1,174.745 1,174.745 1,174.745 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line includes Shoulder Launched Munitions, All Types. (E36101) Launcher and Cartridge 84MM M136A1 (AT4CS-RS) - The AT4CS-RS is the Army's primary shoulder launched, lightweight, anti-armor weapon in support of the joint, multi-domain, high intensity conflicts and near-peer threats. The AT4CS-RS is a one-shot disposable system consisting of a self-contained launch tube and a free-flight, fin-stabilized 84mm high explosive Anti-Armor warhead with the ability to defeat light armor targets. The AT4CS-RS can be fired from a protected area or enclosed space during close combat operations. This item is Code A, approved for service use. (E36406) CTG, Gun, TGT PRAC-TR 141, 84MM CARL GUSTAF (MAAWS) - The 84 MM TPT 141 (Target Practice Tracer) is an inert full caliber training round that is aerodynamically stabilized in flight and fitted with a tracer that is visible throughout the flight up to 400 meters. This item is Code A, approved for service use. (E36412) SHOULDER LAUNCHED INDIVIDUAL ASSAULT MUNITION (IAM): The Individual Assault Munition (IAM) consists of the tactical XM919 IAM munition and training devices including the XM922 subcaliber trainer (SCT), sub-caliber tracer ammunition (SCT Ammo), and the Field Handling Trainer (FHT) in addition to Synthetic Training Environment Live Training System (STE LTS) and Soldier Virtual Trainers (SVT) to be managed by CPE Simulation, Training and Instrumentation (CPE STRI). The tactical XM919 IAM supports the close fight in urban and complex terrain, allowing Soldiers a fire-from-enclosure (FFE) capability to defeat field expedient structures such as earth and timber bunkers, reinforced concrete, adobe and triple brick walls with behind the wall lethality effects as well as defeating light armored vehicles. The IAM training devices provide training capability to increase the Soldier's proficiency and integration of the XM919 tactical system into combat operations. The XM919 IAM enables Soldier lethality by providing multi-target capability and reducing training & logistics burden associated with two systems, extending overmatch against peer/near-peer adversaries in a joint, multi-domain, high-intensity conflict. This item will be Code A, approved for service use. Type Classification-Standard is scheduled for 3QFY26. (E36516) TRAINING DEVICE SLM IAM FIELD HANDLING TRAINER (FHT): The XM919 Field Handling Trainer (FHT) is a specially constructed inert XM919 containing the same form, fit and operator function of the XM919 IAM for the purposes of supporting individual and collective training for the XM919 IAM. The FHT provides a safe and effective means to perform XM919 IAM operator tasks as well as use in collective training at the squad and higher unit level. The FHT is intended to be fielded to installation Training Support Centers globally to support the warfighter. This item is be Code A. Type ClassificationStandard is scheduled for 3QFY26. (E36521) CTG, 9MM PRAC F/IAM SUB-CAL: The XM922 9MM SCT tracer cartridge has a lighter powder charge training cartridge which enables it to closely duplicate the trajectory of the XM919 tactical round at ranges out to 200 meters. The XM919 cartridge also has a tracer element to enable the firer to compare the impact of the cartridge with the sight picture. The firer can see the tracer out to 200 meters. The XM922 SCT AMMO is intended to be distributed throughout Army installation ammunition supply points (ASPs) to support unit training needs. This item is be Code A. LI 2348EA4000 - Shoulder Launched Munitions, All Types Army UNCLASSIFIED Page 1 of 21 P-1 Line #22 Volume 1 - 551 === page 584 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 45: Rockets ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 2348EA4000 / Shoulder Launched Munitions, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A (E36901) ROCKET, PRACTICE, 21MM SUBCALIBER - The 21MM Subcaliber for Shoulder Launched Munitions (SLM) simulates the firing of unguided shoulder fired munitions and is an enabler for Shoulder Launch Munition. The 21MM Subcaliber supports the Army's modernization priorities in support of the National Defense Strategy. The 21MM Subcaliber training round simulates the tactical munitions flight trajectory, but with less noise and back blast. It is currently used by Navy and Marine Corps to simulate the M72 Light Anti-tank Weapon System (LAW). It has also been adapted to the M141 Bunker Defeat Munition (BDM) and issued in New Equipment Training (NET)/Mobile Training Teams (MTT). This item is Code A, approved for service use. (E36914) TRAINING DEVICE SLM IAM SUBCALIBER LAUNCHER: The XM922 SCT is a specially constructed XM919 for the purposes of familiarization and qualification training. The XM922 SCT fires a subcaliber tracer round ballistically matched to mimic the XM919 round to impact a sighted target. The XM922 SCT provides a cost-effective means to provide operator training at initial entry and home station to infantry, cavalry and engineer squad gunners. It is designed to accept a special rifle barrel that fires a reduced load sub-caliber (9MM) tracer cartridge which may be fired at stationary or moving targets. The trainer has a (9mm) submachine gun barrel, a breech assembly, and a bolt. The XM922 SCT is intended to be fielded to installation Training Support Centers globally to support the warfighter. This item is be Code A. Type Classification-Standard is scheduled for 3QFY26. (E88401) BUNKER DEFEAT MUNITION (BDM) - The Bunker Defeat Munition (BDM) is a single-shot, disposable, shoulder launched rocket propelled munition used to defeat earth and timber field fortifications (bunkers) out to 250 meters utilized in support of the joint, multi-domain, high intensity conflict and near-peer threats. The system is also capable of defeating lightly armored vehicles and breaches masonry walls using its 83-millimeter high explosive, dual-purpose rocket. The item is Code A, approved for service use. LI 2348EA4000 - Shoulder Launched Munitions, All Types Army UNCLASSIFIED Page 2 of 21 P-1 Line #22 Volume 1 - 552 === page 585 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 45: Rockets P-1 Line Item Number / Title: 2348EA4000 / Shoulder Launched Munitions, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 E36101 / MUNITION, 84mm Shldr Lnchd, AT-4CS(Confined Space) [CA30] P-5 E36406 / CTG, 84mm Gun, TGT PRAC-TR 141, CARLGSTF (MAAWS) [CA10] P-5a A P-5 E36412 / SHOULDER LAUNCHED INDIVIDUAL ASSAULT MUNITION(IAM) P-5a, P-21 A P-5 E36516 / IAM FIELD HANDLING TRAINER (FHT) P-5a A - / - - P-5 E36521 / CTG, XXMM PRAC F/IAM SUB-CAL P-5a A - / - - / - P-5 E36901 / ROCKET, 21mm Subcaliber Practice Trainer, f/SLM [HA21] / 0.002 P-5 E36914 / TRAINING DEVICE SLM IAM SUBCALIBER LAUNCHER P-5 E88401 / MUNITION, 83mm Bunker Defeat(BDM), Rkt&Lnchr, M141 [HA08] P-40 Total Gross/Weapon System Cost A P-5a - / 299.947 - / 0.041 - / 0.030 - / 0.030 - / - - / 0.030 - / 14.460 - / 0.013 - / 2.902 - / 3.184 - / - - / 3.184 / 69.192 - / 78.720 - / 31.890 - / 37.546 - / - - / 37.546 / - - / 0.050 - / 3.458 - / - - / 3.458 - / - - / 0.655 - / - - / 0.655 - / - - / 0.002 - / - - / 0.002 / 0.050 - / 5.360 - / - - / 5.360 / - - / - / 50.235 - / - - - A A / 13.036 - - / - - / - - / 373.289 - / 0.015 - / 769.924 - / 78.791 - / / 34.922 - - / / 50.235 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Base Budget supports critical Army Title 10 war reserve/operational, training, and test requirements IAW Department of War Instruction 3000.04 (Munitions Requirements Process) and AR 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support OSW-approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. FY 2027 Total Base dollars in the amount of $50.235 million supports the procurement of seven Shoulder Launched Munitions items. (E36101) Launcher and Cartridge 84MM M136A1 (AT4CS-RS) - This is a training standard item used in both training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goal. FY 2027 Base procurement dollars in the amount of $0.030 million supports engineering for items in production. Type Classification Date: 2009 (E36406) CTG, Gun, TGT PRAC-TR 141, 84MM CARL GUSTAF (MAAWS) - This is a training unique item not used in combat. FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $3.184 million supports the procurement of 762 rounds. Type Classification Date: 2017 (E36412) SHOULDER LAUNCHED INDIVIDUAL ASSAULT MUNITION (IAM) - This is a training standard item used in both training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goal. FY 2027 Base procurement dollars in the amount of $37.546 million supports the procurement of 3,413 IAMs. Type Classification Date: 3QFY26 LI 2348EA4000 - Shoulder Launched Munitions, All Types Army UNCLASSIFIED Page 3 of 21 P-1 Line #22 Volume 1 - 553 === page 586 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 45: Rockets ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 2348EA4000 / Shoulder Launched Munitions, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A (E36516) TRAINING DEVICE SLM IAM FIELD HANDLING TRAINER (FHT): This is a training unique item not used in combat. FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $3.458 million supports the procurement of 580 field handling trainers. Type Classification Date: 3QFY26 (E36521) CTG, 9MM PRAC F/IAM SUB-CAL: This is a training unique item not used in combat. FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $0.655 million supports the procurement of 122,811 SCT tracer cartridges. E36521 is a New Start in FY 2027. Type Classification Date: 3QFY26 (E36901) ROCKET, PRACTICE, 21MM SUBCALIBER for Shoulder Launched Munitions (SLM): This is a training unique item not used in combat. FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $0.002 million supports engineering for items in production. Type Classification Date: 1993 (E36914) TRAINING DEVICE SLM IAM SUBCALIBER LAUNCHER: This is a training unique item not used in combat. FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $5.360 million supports the procurement of 627 IAM Subcaliber launchers. Type Classification Date: 3QFY26 (E88401) BUNKER DEFEAT MUNITION, 83mm Rocket & Launcher, M141 - This is a training standard item used in both training and combat. The request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goal. There is no FY 2027 budget request for this funding line. Type Classification Date: 2008 LI 2348EA4000 - Shoulder Launched Munitions, All Types Army UNCLASSIFIED Page 4 of 21 P-1 Line #22 Volume 1 - 554 === page 587 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2348EA4000 / Shoulder Launched Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E36101 / MUNITION, 84mm Shldr Lnchd, AT-4CS(Confined Space) [CA30] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 0.041 0.030 0.030 - 0.030 - Gross/Weapon System Cost ($ in Millions) 299.947 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 299.947 Plus CY Advance Procurement ($ in Millions) - - - - - 0.041 0.030 0.030 - 0.030 - Total Obligation Authority ($ in Millions) 299.947 FY 2027 Total - - - - - 0.041 0.030 0.030 - 0.030 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE ROUND 4,950.81 56,482 279.632 - - - - - - - - - - - - - - - - - 279.632 - - - - - - - - - - - - - - - - - 279.632 - - - - - - - - - - - - - - - Acceptance Test - - 0.133 - - - - - - - - - - - - - - - First Article Test - - 0.211 - - - - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 0.344 - - - - - - - - - - - - - - - Production Qualification Test - - 0.064 - - - - - - - - - - - - - - - Subtotal: Support - Product Improvement Cost - - 0.064 - - - - - - - - - - - - - - - Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Product Improvement Cost Support - Production Engineering Cost Production Engineering - - 19.907 - - 0.041 - - 0.030 - - 0.030 - - - - - 0.030 Subtotal: Support Production Engineering Cost - - 19.907 - - 0.041 - - 0.030 - - 0.030 - - - - - 0.030 Gross/Weapon System Cost - - 299.947 - - 0.041 - - 0.030 - - 0.030 - - - - - 0.030 LI 2348EA4000 - Shoulder Launched Munitions, All Types Army UNCLASSIFIED Page 5 of 21 P-1 Line #22 Volume 1 - 555 === page 588 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2348EA4000 / Shoulder Launched Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E36406 / CTG, 84mm Gun, TGT PRACTR 141, CARLGSTF (MAAWS) [CA10] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 14.460 0.013 2.902 3.184 - 3.184 - - - - - - 14.460 0.013 2.902 3.184 - 3.184 - - - - - - 14.460 0.013 2.902 3.184 - 3.184 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 517.00 23,764 12.286 - - - Subtotal: Recurring Cost - - 12.286 - - - - - 12.286 - - - Acceptance Test - - 0.109 - - Subtotal: Support Acceptance Testing Cost - - 0.109 - ROUND Subtotal: Hardware Cost 3,534.96 698 2.467 - - 2.467 - - 2.467 - - - - - - 3,566.13 762 2.717 - - - - - 2.717 - - - - - 2.717 - - - - - - - - - - - - - - - 3,566.13 762 2.717 - - 2.717 - - 2.717 - - - - - - - - - Support - Acceptance Testing Cost Support - Production Engineering Cost Production Engineering - - 2.065 - - 0.013 - - 0.435 - - 0.467 - - - - - 0.467 Subtotal: Support Production Engineering Cost - - 2.065 - - 0.013 - - 0.435 - - 0.467 - - - - - 0.467 Gross/Weapon System Cost - - 14.460 - - 0.013 - - 2.902 - - 3.184 - - - - - 3.184 Remarks: FY 2026 to FY 2027 unit price increase due to option year increases in contract pricing matrix. (†) indicates the presence of a P-5a LI 2348EA4000 - Shoulder Launched Munitions, All Types Army UNCLASSIFIED Page 6 of 21 P-1 Line #22 Volume 1 - 556 === page 589 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 Cost Elements COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 2348EA4000 / Shoulder Launched Munitions, All Types Method/Type or Funding Vehicle Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 SAAB DYNAMICS AKTIEBOLAG / KARLSKOGA, SWEDEN Option / FFP PICATINNY ARSENAL, NJ Mar 2026 Mar 2027 698 3,534.96 Y 2027 SAAB DYNAMICS AKTIEBOLAG / KARLSKOGA, SWEDEN Option / FFP PICATINNY ARSENAL, NJ Mar 2027 Mar 2028 762 3,566.13 Y LI 2348EA4000 - Shoulder Launched Munitions, All Types Army Location of PCO Award Date Item Number / Title [DODIC]: E36406 / CTG, 84mm Gun, TGT PRACTR 141, CARLGSTF (MAAWS) [CA10] UNCLASSIFIED Page 7 of 21 P-1 Line #22 (Each) RFP Issue Date Volume 1 - 557 === page 590 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2348EA4000 / Shoulder Launched Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E36412 / SHOULDER LAUNCHED INDIVIDUAL ASSAULT MUNITION(IAM) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 69.192 78.720 31.890 37.546 - 37.546 - - - - - - 69.192 78.720 31.890 37.546 - 37.546 - - - - - - 69.192 78.720 31.890 37.546 - 37.546 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE ROUND (†) 6,625.00 Subtotal: Recurring Cost - 9,711 64.335 - 64.335 6,745.94 11,440 77.174 - - 77.174 7,578.91 3,478 26.359 - - 26.359 8,203.43 3,824 31.370 - - - - - 31.370 - - - 8,203.43 3,824 31.370 - - 31.370 Non Recurring Cost First Article Test (FAT) Hardware 6,625.00 40 0.265 - - - - - - - - - - - - - - - Production Verification Test (PVT) Hardware 6,625.00 523 3.465 - - - - - - - - - - - - - - - - - 3.730 - - - - - - - - - - - - - - - - - 68.065 - - 77.174 - - 26.359 - - 31.370 - - - - - 31.370 First Article Test - - 0.250 - - - - - - - - - - - - - - - Acceptance Test - - 0.267 - - 0.558 - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 0.517 - - 0.558 - - - - - - - - - - - - Production Engineering - - 0.610 - - 0.988 - - 5.531 - - 6.176 - - - - - 6.176 Subtotal: Support Production Engineering Cost - - 0.610 - - 0.988 - - 5.531 - - 6.176 - - - - - 6.176 Subtotal: Non Recurring Cost Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Production Engineering Cost LI 2348EA4000 - Shoulder Launched Munitions, All Types Army UNCLASSIFIED Page 8 of 21 P-1 Line #22 Volume 1 - 558 === page 591 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2348EA4000 / Shoulder Launched Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E36412 / SHOULDER LAUNCHED INDIVIDUAL ASSAULT MUNITION(IAM) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Gross/Weapon System Cost Unit Cost ($) - FY 2025 Total Cost Qty (Each) ($ M) - 69.192 Unit Cost ($) Qty (Each) - FY 2026 Total Cost ($ M) - 78.720 Unit Cost ($) - FY 2027 Base Total Cost Qty (Each) ($ M) - 31.890 Unit Cost ($) - FY 2027 OOC Total Cost Qty (Each) ($ M) - 37.546 Unit Cost ($) - FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) - ($) - - Total Cost Qty (Each) ($ M) - 37.546 Remarks: FY 2026 to FY 2027 unit price increase reflects contract pricing matrix accounting for inflation and exchange rates. Saab Inc. (East Syracuse, NY) will onshore XM919 production to Grayling, MI beginning in FY 2027. (†) indicates the presence of a P-5a LI 2348EA4000 - Shoulder Launched Munitions, All Types Army UNCLASSIFIED Page 9 of 21 P-1 Line #22 Volume 1 - 559 === page 592 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 2348EA4000 / Shoulder Launched Munitions, All Types FY Contractor and Location Method/Type or Funding Vehicle 2026 SAAB INC / Syracuse, New York Option / FFP PICATINNY ARSENAL, NJ May 2026 Aug 2027 3,478 7,578.91 Y 2027 SAAB INC / Syracuse, New York Option / FFP PICATINNY ARSENAL, NJ Mar 2027 Aug 2028 3,824 8,203.43 Y Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: E36412 / SHOULDER LAUNCHED INDIVIDUAL ASSAULT MUNITION(IAM) Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date indicates the presence of a P-21 LI 2348EA4000 - Shoulder Launched Munitions, All Types Army UNCLASSIFIED Page 10 of 21 P-1 Line #22 Volume 1 - 560 === page 593 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2348EA4000 / Shoulder Launched Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 Cost Elements (Units in Each) O O C M F R # FY SERVICE Item Number / Title [DODIC]: E36412 / SHOULDER LAUNCHED INDIVIDUAL ASSAULT MUNITION(IAM) Fiscal Year 2026 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 9711 1 2026 ARMY 3,478 0 3,478 1 2027 ARMY 3,824 0 3,824 A O C T N O V D E C J A N LI 2348EA4000 - Shoulder Launched Munitions, All Types Army F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 21 S E P O C T N O V D E C J A N F E B P-1 Line #22 - - - - - 265 256 2,957 A - - - - - - - 3,824 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 561 === page 594 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2348EA4000 / Shoulder Launched Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E36412 / SHOULDER LAUNCHED INDIVIDUAL ASSAULT MUNITION(IAM) Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND Prior Years Deliveries: 9711 1 2026 ARMY 3,478 521 2,957 256 256 256 256 256 256 256 256 256 256 397 1 2027 ARMY 3,824 0 3,824 - - - - - - - - - - 500 500 500 500 500 500 413 411 A U G S E P O C T N O V D E C J A N F E B M A R O C T N O V D E C J A N LI 2348EA4000 - Shoulder Launched Munitions, All Types Army F E B M A R A P R M A Y J U N J U L UNCLASSIFIED Page 12 of 21 0 P-1 Line #22 0 A P R M A Y J U N J U L A U G S E P Volume 1 - 562 === page 595 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 2348EA4000 / Shoulder Launched Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: E36412 / SHOULDER LAUNCHED INDIVIDUAL ASSAULT MUNITION(IAM) Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 SAAB INC - Syracuse, New York MSR For 2027 1-8-5 For 2027 MAX For 2027 500 5,000 15,000 ALT Prior to Oct 1 ALT After Oct 1 8 Reorder Manufacturing PLT 8 15 Total After Oct 1 ALT Prior to Oct 1 23 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 12 18 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 2348EA4000 - Shoulder Launched Munitions, All Types Army UNCLASSIFIED Page 13 of 21 P-1 Line #22 Volume 1 - 563 === page 596 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2348EA4000 / Shoulder Launched Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E36516 / IAM FIELD HANDLING TRAINER (FHT) MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - 0.050 3.458 - 3.458 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - 0.050 3.458 - 3.458 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - 0.050 3.458 - 3.458 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) - - - - - - - - - Subtotal: Recurring Cost - - - - - - - - - - - - - - - - - - ROUND Subtotal: Hardware Cost 4,577.54 580 2.655 - - - - - 2.655 - - - - - 2.655 - - - 4,577.54 580 2.655 - - 2.655 - - 2.655 Support - Production Engineering Cost Production Engineering - - - - - - - - 0.050 - - 0.803 - - - - - 0.803 Subtotal: Support Production Engineering Cost - - - - - - - - 0.050 - - 0.803 - - - - - 0.803 Gross/Weapon System Cost - - - - - - - - 0.050 - - 3.458 - - - - - 3.458 (†) indicates the presence of a P-5a LI 2348EA4000 - Shoulder Launched Munitions, All Types Army UNCLASSIFIED Page 14 of 21 P-1 Line #22 Volume 1 - 564 === page 597 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 Cost Elements COMPLETE ROUND O O C P-1 Line Item Number / Title: 2348EA4000 / Shoulder Launched Munitions, All Types FY Contractor and Location Method/Type or Funding Vehicle 2027 SAAB INC / Syracuse, New York Option / FFP LI 2348EA4000 - Shoulder Launched Munitions, All Types Army Location of PCO PICATINNY ARSENAL, NJ UNCLASSIFIED Page 15 of 21 Award Date Date of First Delivery Mar 2027 Sep 2028 P-1 Line #22 Item Number / Title [DODIC]: E36516 / IAM FIELD HANDLING TRAINER (FHT) Qty (Each) 580 Specs Date Unit Cost Avail Revision Now? Available ($) 4,577.54 RFP Issue Date Y Volume 1 - 565 === page 598 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2348EA4000 / Shoulder Launched Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E36521 / CTG, XXMM PRAC F/IAM SUB-CAL MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - - 0.655 - 0.655 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - - 0.655 - 0.655 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - - 0.655 - 0.655 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) - - - - - - - - - 4.10 Subtotal: Recurring Cost - - - - - - - - - - - - - - - - - - - - ROUND Subtotal: Hardware Cost 122,811 0.504 - - - 4.10 122,811 0.504 - 0.504 - - - - - 0.504 - 0.504 - - - - - 0.504 Support - Production Engineering Cost Production Engineering - - - - - - - - - - - 0.151 - - - - - 0.151 Subtotal: Support Production Engineering Cost - - - - - - - - - - - 0.151 - - - - - 0.151 Gross/Weapon System Cost - - - - - - - - - - - 0.655 - - - - - 0.655 (†) indicates the presence of a P-5a LI 2348EA4000 - Shoulder Launched Munitions, All Types Army UNCLASSIFIED Page 16 of 21 P-1 Line #22 Volume 1 - 566 === page 599 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 Cost Elements COMPLETE ROUND O O C P-1 Line Item Number / Title: 2348EA4000 / Shoulder Launched Munitions, All Types FY Contractor and Location Method/Type or Funding Vehicle 2027 SAAB INC / Syracuse, NY Option / FFP LI 2348EA4000 - Shoulder Launched Munitions, All Types Army Location of PCO PICATINNY ARSENAL, NJ UNCLASSIFIED Page 17 of 21 Item Number / Title [DODIC]: E36521 / CTG, XXMM PRAC F/IAM SUB-CAL Award Date Date of First Delivery (Each) Mar 2027 Aug 2028 122,811 P-1 Line #22 Qty Specs Date Unit Cost Avail Revision Now? Available ($) 4.10 RFP Issue Date N Volume 1 - 567 === page 600 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2348EA4000 / Shoulder Launched Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E36901 / ROCKET, 21mm Subcaliber Practice Trainer, f/SLM [HA21] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 13.036 0.002 - 0.002 - 0.002 - - - - - - 13.036 0.002 - 0.002 - 0.002 - - - - - - 13.036 0.002 - 0.002 - 0.002 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Complete Round 245.10 44,725 10.962 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 10.962 - - - - - - - - - - - - - - - - - 10.962 - - - - - - - - - - - - - - - Subtotal: Hardware Cost Support - Production Engineering Cost Production Engineering - - 2.074 - - 0.002 - - - - - 0.002 - - - - - 0.002 Subtotal: Support Production Engineering Cost - - 2.074 - - 0.002 - - - - - 0.002 - - - - - 0.002 Gross/Weapon System Cost - - 13.036 - - 0.002 - - - - - 0.002 - - - - - 0.002 LI 2348EA4000 - Shoulder Launched Munitions, All Types Army UNCLASSIFIED Page 18 of 21 P-1 Line #22 Volume 1 - 568 === page 601 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2348EA4000 / Shoulder Launched Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E36914 / TRAINING DEVICE SLM IAM SUBCALIBER LAUNCHER MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - 0.050 5.360 - 5.360 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - 0.050 5.360 - 5.360 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - 0.050 5.360 - 5.360 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) - - - - - - - - - Subtotal: Recurring Cost - - - - - - - - - - - - - - - - - - ROUND Subtotal: Hardware Cost 6,567.10 627 4.118 - - - - - 4.118 - - - - - 4.118 - - - 6,567.10 627 4.118 - - 4.118 - - 4.118 Support - Production Engineering Cost Production Engineering - - - - - - - - 0.050 - - 1.242 - - - - - 1.242 Subtotal: Support Production Engineering Cost - - - - - - - - 0.050 - - 1.242 - - - - - 1.242 Gross/Weapon System Cost - - - - - - - - 0.050 - - 5.360 - - - - - 5.360 (†) indicates the presence of a P-5a LI 2348EA4000 - Shoulder Launched Munitions, All Types Army UNCLASSIFIED Page 19 of 21 P-1 Line #22 Volume 1 - 569 === page 602 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 Cost Elements COMPLETE ROUND O O C P-1 Line Item Number / Title: 2348EA4000 / Shoulder Launched Munitions, All Types FY Contractor and Location Method/Type or Funding Vehicle 2027 SAAB INC / Syracuse, New York Option / FFP LI 2348EA4000 - Shoulder Launched Munitions, All Types Army Location of PCO PICATINNY ARSENAL, NJ UNCLASSIFIED Page 20 of 21 Award Date Date of First Delivery Mar 2027 Sep 2028 P-1 Line #22 Item Number / Title [DODIC]: E36914 / TRAINING DEVICE SLM IAM SUBCALIBER LAUNCHER Qty (Each) 627 Specs Date Unit Cost Avail Revision Now? Available ($) 6,567.10 RFP Issue Date Y Volume 1 - 570 === page 603 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2348EA4000 / Shoulder Launched Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E88401 / MUNITION, 83mm Bunker Defeat(BDM), Rkt&Lnchr, M141 [HA08] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC FY 2027 Total - FY 2026 - - - - 0.015 - - - - - - - - - 0.015 - - - - - - - - - 0.015 - - - - - Gross/Weapon System Cost ($ in Millions) 373.289 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 373.289 Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) 373.289 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost BUNKER DEFEAT MUNITION (BDM) 38,516.00 Subtotal: Recurring Cost Subtotal: Hardware Cost 9,540 367.443 - - - - - - - - - - - - - - - - - 367.443 - - - - - - - - - - - - - - - - - 367.443 - - - - - - - - - - - - - - - Support - Production Engineering Cost Production Engineering - - 5.846 - - 0.015 - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - 5.846 - - 0.015 - - - - - - - - - - - - Gross/Weapon System Cost - - 373.289 - - 0.015 - - - - - - - - - - - - LI 2348EA4000 - Shoulder Launched Munitions, All Types Army UNCLASSIFIED Page 21 of 21 P-1 Line #22 Volume 1 - 571 === page 604 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 45: Rockets ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3246E37300 / Rocket, Hydra 70, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 1,699.505 1,699.505 1,699.505 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 34.836 92.772 - 92.772 92.683 93.341 93.254 - - - - - - - 34.836 92.772 - 92.772 92.683 93.341 93.254 - - - - - - - 34.836 92.772 - 92.772 92.683 93.341 93.254 110.082 110.082 110.082 To FY 2031 Complete 94.184 Continuing - Continuing - 94.184 Continuing - Total - Continuing - - 94.184 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Aviation Rockets and Small Guided Munitions Product Office is the executive procurement agent for all services and Foreign Military customers, for all variants of aviation rockets. This budget line procures all aviation rockets and small guided munition types in support of Army operational, training and war reserve requirements. The systems provide combat overmatch capability and ensure the availability of munitions to support combat operations. Aviation rockets and small guided munitions are used on manned and unmanned platforms by Army, Navy, Air Force, Special Operations and Foreign Military aircraft. The unguided systems perform a number of roles including anti-materiel, anti-personnel, air-to-ground suppression and illumination. The guided systems are used to provide increased accuracy over the unguided munitions in precision strikes against lightly armored and soft point targets enabling better conformance to restricted rules of engagement. This Hydra-70 rocket funding supports the entire aviation rocket system and small guided munitions to include resolution of obsolescence, safety, insensitive munitions, reliability, weapon integration activities, test sets, engineering changes, production issues, lifetime buys of obsolete components, guidance section testing and repair kits, and emerging requirements. LI 3246E37300 - Rocket, Hydra 70, All Types Army UNCLASSIFIED Page 1 of 13 P-1 Line #23 Volume 1 - 572 === page 605 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 45: Rockets ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 3246E37300 / Rocket, Hydra 70, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits P-5 E37412 / AMMO-Hydra, Aviation Rocket Procurement, Unguided P-5a, P-21 P-5 E37413 / Aviation Rocket Procurement, Guided P-5a P-40 Total Gross/Weapon System Cost ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 1,156.724 - - - / 542.781 / 1,699.505 - / 109.342 - / 34.096 - / 87.374 - / - - / 0.740 - / 0.740 - / 5.398 - / - - / 87.374 / 5.398 / 110.082 - / 34.836 - / 92.772 - / - - / 92.772 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 Budget supports critical Army Title 10 war reserve/operational, training, and test requirements in accordance with Department of Defense Instruction 3000.04 (Munitions Requirements Process) and Army Regulation 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War (OSW) approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout the life cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. FY 2027 Hydra-70 Base funding of $92.772 million will procure 22,173 Unguided Hydra-70 rockets and 140 Guided Hydra-70 rockets. The Army intends to convert any price advantage created through contract negotiations, other service procurement, and/or Foreign Military Sales (FMS) to increase procurement of Hydra-70 rockets, and/or address safety, reliability, affordability, and/or obsolescence. LI 3246E37300 - Rocket, Hydra 70, All Types Army UNCLASSIFIED Page 2 of 13 P-1 Line #23 Volume 1 - 573 === page 606 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3246E37300 / Rocket, Hydra 70, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: E37412 / AMMO-Hydra, Aviation Rocket Procurement, Unguided MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) 1,156.724 Less PY Advance Procurement ($ in Millions) 109.342 - Net Procurement (P-1) ($ in Millions) 109.342 - Total Obligation Authority ($ in Millions) FY 2027 OOC - - - 34.096 87.374 - 87.374 - - - - 34.096 87.374 - 87.374 - - - - 34.096 87.374 - 87.374 - 1,156.724 Plus CY Advance Procurement ($ in Millions) FY 2027 Base - - - 1,156.724 109.342 FY 2027 Total (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements FY 2025 ($) Qty (Each) Total Cost 1,030.46 842,765 868.436 Unit Cost ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost Complete Round (†) Radford Army Ammunition Plant (AAP) Industrial Facilities - - Recurring Engineering - Subtotal: Recurring Cost - 1,911.10 40,964 78.286 14.553 3,477.23 4,366 15.182 - - 1.875 3,245.91 22,173 71.972 - - - - - - - - - 3,245.91 22,173 71.972 - - - 130.421 - - - 4.056 - - - - - - - - - - - - - - - - 1,002.913 - - 92.839 - - 17.056 - - 71.972 - - - - - 71.972 - - 1,002.913 - - 92.839 - - 17.056 - - 71.972 - - - - - 71.972 Radford Army Ammunition Plant (AAP) - - 44.485 - - - - - - - - - - - - - - - Subtotal: Support - Industrial Facilities Cost - - 44.485 - - - - - - - - - - - - - - - Production Engineering - - 63.895 - - 7.402 - - 7.546 - - 5.721 - - - - - 5.721 Subtotal: Support Production Engineering Cost - - 63.895 - - 7.402 - - 7.546 - - 5.721 - - - - - 5.721 - - 45.430 - - 9.100 - - 9.494 - - 9.681 - - - - - 9.681 Subtotal: Flyaway Cost Support - Industrial Facilities Cost Support - Production Engineering Cost Support - Program Management Cost Government Management LI 3246E37300 - Rocket, Hydra 70, All Types Army UNCLASSIFIED Page 3 of 13 P-1 Line #23 Volume 1 - 574 === page 607 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3246E37300 / Rocket, Hydra 70, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: E37412 / AMMO-Hydra, Aviation Rocket Procurement, Unguided MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Subtotal: Support - Program Management Cost - - 45.430 - - 9.100 - - 9.494 - - 9.681 - - - - - 9.681 Gross/Weapon System Cost - - 1,156.724 - - 109.342 - - 34.096 - - 87.374 - - - - - 87.374 Remarks: The Program Office is under a Section 806 of the National Defense Authorization Act for Fiscal Year 1999 (Public Law 105-261) restriction to procure MK90 Propellant Grain from Radford Army Ammunition Plant to maintain a facility, producer, manufacturer, or supplier for an essential item of ammunition. Customers, including Hydra-70 guided and unguided rocket motor grains/propellant procurement, are no longer directly funding RFAAP PWS costs. These costs are expected to be resourced through a separate and independent funding line from customer procurement funds. While the Hydra-70 overall Production Engineering and Program Management costs maintain a consistent level of effort each year, these costs are allocated to all services on a pro-rata share of quantities procured. This can result in a year-to-year fluctuation of the Army's share. Support - Production Engineering Cost are shared between E37412 / AMMO-Hydra, Aviation Rocket Procurement, Unguided and E37413 / Aviation Rocket Procurement, Guided baby lines. FY 2025 PROC AMMO Unguided reflects receipt of $38.4 million of Ukraine Supplemental Funding (Tranche 27); Additional 15,264 quantity. FY 2025 PROC AMMO Unguided reflects receipt of $37.4 million of Indo-Pacific Supplemental Funding (Tranche 27); Additional 9,579 quantity. (†) indicates the presence of a P-5a LI 3246E37300 - Rocket, Hydra 70, All Types Army UNCLASSIFIED Page 4 of 13 P-1 Line #23 Volume 1 - 575 === page 608 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 Cost Elements O O C (†) Complete Round (†) Complete Round (†) Complete Round (†) Complete Round (†) ✓ P-1 Line Item Number / Title: 3246E37300 / Rocket, Hydra 70, All Types Item Number / Title [DODIC]: E37412 / AMMO-Hydra, Aviation Rocket Procurement, Unguided FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery (Each) 2024 General Dynamics / Williston, VT C / FFP Redstone Arsenal, AL Mar 2024 Sep 2025 102,390 1,083.27 Y Aug 2018 2025 General Dynamics / Williston, VT SS / FFP Redstone Arsenal, AL Jul 2025 Jan 2027 40,964 1,911.10 Y Aug 2024 2026 General Dynamics / Williston, VT SS / FFP Redstone Arsenal, AL Jun 2026 Dec 2027 4,366 3,477.23 Y Aug 2024 2027 General Dynamics / Williston, VT SS / FFP Redstone Arsenal, AL Jun 2027 Dec 2028 22,173 3,245.91 Y Aug 2024 Qty Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date indicates the presence of a P-21 Remarks: - QTY EA for delivery schedule for the P-5a. - Contractor minimum sustainment rate for the total of all variants is 125,000 rockets annually. - The Aviation Rockets and Small Guided Munitions Product Office is the executive procurement agent for all services and Foreign Military customers, for all variants of aviation rockets. - Other services and FMS customers are shown on the P-21 delivery schedule. - SS / FFP: Sole Source / Firm Fixed Price LI 3246E37300 - Rocket, Hydra 70, All Types Army UNCLASSIFIED Page 5 of 13 P-1 Line #23 Volume 1 - 576 === page 609 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3246E37300 / Rocket, Hydra 70, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E37412 / AMMO-Hydra, Aviation Rocket Procurement, Unguided Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Complete Round Prior Years Deliveries: 740375 ✓ 1 2024 AF (‡) 15.538 .000 15.538 A - - - - - - - - - - - - - - - - - - 1.295 14.243 1 2024 ARMY 102.390 .000 102.390 A - - - - - - - - - - - - - - - - - - 8.533 93.857 1 2024 NAVY 34.450 .000 34.450 A - - - - - - - - - - - - - - - - - - 2.871 31.579 1 2024 Total 152.378 .000 152.378 - - - - - - - - - - - - - - - - - - 12.699 139.679 1 2025 ARMY 40.964 .000 40.964 A - - - 40.964 1 2025 NAVY 13.163 .000 13.163 A - - - 13.163 1 2025 Total 54.127 .000 54.127 - - - 54.127 1 2026 ARMY 4.366 .000 4.366 4.366 1 2027 ARMY 22.173 .000 22.173 22.173 1 2027 NAVY 16.545 .000 16.545 16.545 1 2027 Total Base 38.718 .000 38.718 (‡) (‡) (‡) 38.718 O C T N O V LI 3246E37300 - Rocket, Hydra 70, All Types Army D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #23 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 577 === page 610 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3246E37300 / Rocket, Hydra 70, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E37412 / AMMO-Hydra, Aviation Rocket Procurement, Unguided Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT B A L A N C E Fiscal Year 2027 Calendar Year 2026 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Complete Round Prior Years Deliveries: 740375 ✓ 1 2024 AF (‡) 15.538 1.295 14.243 1.295 1.295 1.295 1.295 1.295 1.295 1.295 1.295 1.295 1.295 1.293 .000 1 2024 ARMY 102.390 8.533 93.857 8.533 8.533 8.533 8.533 8.533 8.532 8.532 8.532 8.532 8.532 8.532 .000 1 2024 NAVY 34.450 2.871 31.579 2.871 2.871 2.871 2.871 2.871 2.871 2.871 2.871 2.871 2.871 2.869 1 2024 Total 152.378 12.699 139.679 12.699 12.699 12.699 12.699 12.699 12.698 12.698 12.698 12.698 12.698 12.694 1 2025 ARMY 40.964 .000 40.964 - - - - - - - - - - 1 2025 NAVY 13.163 .000 13.163 - - - - - - - - - 1 2025 Total 54.127 .000 54.127 - - - - - - - - - 1 2026 ARMY 4.366 .000 A - 1 2027 ARMY 22.173 .000 22.173 1 2027 NAVY 16.545 .000 16.545 1 2027 Total Base 38.718 .000 38.718 (‡) (‡) (‡) 4.366 O C T N O V LI 3246E37300 - Rocket, Hydra 70, All Types Army D E C J A N F E B M A R A P R M A Y J U N .000 - - - - - - - - - - - - - - - - - 3.413 3.413 3.413 3.413 3.414 3.414 3.414 3.414 3.414 10.242 - - - - - 1.097 1.097 1.097 1.097 1.097 1.097 1.097 1.097 1.097 1.097 - - - - - 1.097 4.510 4.510 4.510 4.510 4.511 4.511 4.511 4.511 4.511 12.435 - - - - - - - - - - - - - - - 4.366 A - - - - 22.173 A - - - - 16.545 - - - - 38.718 J U L A U G UNCLASSIFIED Page 7 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #23 M A R A P R M A Y J U N J U L A U G - .000 2.193 S E P Volume 1 - 578 === page 611 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3246E37300 / Rocket, Hydra 70, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E37412 / AMMO-Hydra, Aviation Rocket Procurement, Unguided Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Complete Round Prior Years Deliveries: 740375 ✓ 1 2024 AF (‡) 15.538 15.538 .000 .000 1 2024 ARMY 102.390 102.390 .000 .000 1 2024 NAVY 34.450 34.450 .000 1 2024 Total 152.378 152.378 .000 1 2025 ARMY 40.964 1 2025 NAVY 1 2025 1 (‡) .000 - - - 30.722 10.242 3.414 3.414 3.414 13.163 10.970 2.193 1.097 1.096 - Total 54.127 41.692 12.435 4.511 4.510 3.414 - - - - - - - - - - - 2026 ARMY 4.366 .000 4.366 - - .364 .364 .364 .364 .364 .364 .364 .364 .364 .364 .363 .363 1 2027 ARMY 22.173 .000 22.173 - - - - - - - - - - - - - 1 2027 NAVY 16.545 .000 16.545 - - - - - - - - - - - - 1 2027 Total Base 38.718 .000 38.718 - - - - - - - - - - - - (‡) (‡) O C T N O V LI 3246E37300 - Rocket, Hydra 70, All Types Army D E C - - - - - - - - - - - - - - - - - - - - - .000 .000 .000 J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 13 S E P O C T - - - - - - - - - - .000 - 1.848 1.848 1.848 1.848 1.848 1.848 1.848 1.848 1.848 1.847 3.694 - - 1.379 1.379 1.379 1.379 1.379 1.379 1.379 1.379 1.379 1.378 2.756 - - 3.227 3.227 3.227 3.227 3.227 3.227 3.227 3.227 3.227 3.225 6.450 D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P N O V .000 P-1 Line #23 Volume 1 - 579 === page 612 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3246E37300 / Rocket, Hydra 70, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E37412 / AMMO-Hydra, Aviation Rocket Procurement, Unguided Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2031 M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Complete Round Prior Years Deliveries: 740375 ✓ 1 2024 AF (‡) 15.538 15.538 .000 .000 1 2024 ARMY 102.390 102.390 .000 .000 1 2024 NAVY 34.450 34.450 .000 1 2024 Total 152.378 152.378 .000 1 2025 ARMY 40.964 40.964 .000 1 2025 NAVY 13.163 13.163 .000 1 2025 Total 54.127 54.127 .000 1 2026 ARMY 4.366 4.366 .000 1 2027 ARMY 22.173 18.479 1 2027 NAVY 16.545 1 2027 Total Base 38.718 (‡) (‡) (‡) .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 .000 .000 - - 3.694 1.847 1.847 13.789 2.756 1.378 1.378 32.268 6.450 3.225 3.225 O C T N O V - - - - - - - - - - - - - - - - - - - - - - .000 .000 LI 3246E37300 - Rocket, Hydra 70, All Types Army .000 .000 D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #23 M A R A P R M A Y J U N J U L A U G - .000 S E P Volume 1 - 580 === page 613 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3246E37300 / Rocket, Hydra 70, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: E37412 / AMMO-Hydra, Aviation Rocket Procurement, Unguided Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 General Dynamics - Williston, VT MSR For 2027 1-8-5 For 2027 MAX For 2027 125,000 330,000 330,000 ALT Prior to Oct 1 ALT After Oct 1 7 Reorder Manufacturing PLT 6 18 Total After Oct 1 ALT Prior to Oct 1 24 ALT After Oct 1 7 Manufacturing PLT 6 Total After Oct 1 18 24 Remarks: MSR will not be achieved in FY 2026. Continuing procurements below MSR are increasing unit cost and uncertainty in the industrial base. Multiple years of procurement below MSR limits the ability of the industrial base to surge production to meet wartime requirements due to reduction in workforce, loss of facility capacity, and reduction in qualified vendors. A DCMA study conducted in FY 2022 established an MSR of 125,000. (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 3246E37300 - Rocket, Hydra 70, All Types Army UNCLASSIFIED Page 10 of 13 P-1 Line #23 Volume 1 - 581 === page 614 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3246E37300 / Rocket, Hydra 70, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: E37413 / Aviation Rocket Procurement, Guided MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 0.740 0.740 5.398 - 5.398 - Gross/Weapon System Cost ($ in Millions) 542.781 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 542.781 Plus CY Advance Procurement ($ in Millions) - - - - - 0.740 0.740 5.398 - 5.398 - Total Obligation Authority ($ in Millions) 542.781 FY 2027 Total - - - - - 0.740 0.740 5.398 - 5.398 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements FY 2025 FY 2026 20,450 452.043 30,039.00 20 0.601 31,773.00 19 0.604 32,888.00 140 4.604 - - - 32,888.00 140 4.604 2,011.46 17,881 35.967 6,552.09 20 0.131 6,749.48 19 0.128 5,669.14 140 0.794 - - - 5,669.14 140 0.794 3.343 - - 0.008 - - 0.008 - - - - - - - - - (Each) ($ M) ($) Qty (Each) Unit Cost ($ M) ($) Qty (Each) Unit Cost ($ M) ($) Total Cost FY 2027 Total 22,104.77 ($) Unit Cost Total Cost FY 2027 OOC Qty Unit Cost Total Cost FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost Complete Round, (†) Guidance Section Complete Round, Unguided Section Radford Army Ammunition Plant (AAP) - Industrial Facilities - - Recurring Engineering - - 0.253 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 491.605 - - 0.740 - - 0.740 - - 5.398 - - - - - 5.398 - - 491.605 - - 0.740 - - 0.740 - - 5.398 - - - - - 5.398 Radford Army Ammunition Plant (AAP) - - 7.011 - - - - - - - - - - - - - - - Equipment Acquisition or Modernization - - 0.342 - - - - - - - - - - - - - - - Subtotal: Support - Industrial Facilities Cost - - 7.353 - - - - - - - - - - - - - - - Production Engineering - - 25.734 - - - - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - 25.734 - - - - - - - - - - - - - - - Subtotal: Flyaway Cost Support - Industrial Facilities Cost Support - Production Engineering Cost LI 3246E37300 - Rocket, Hydra 70, All Types Army UNCLASSIFIED Page 11 of 13 P-1 Line #23 Volume 1 - 582 === page 615 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3246E37300 / Rocket, Hydra 70, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: E37413 / Aviation Rocket Procurement, Guided MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Support - Program Management Cost Government Management - - 18.088 - - - - - - - - - - - - - - - Subtotal: Support - Program Management Cost - - 18.088 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 542.781 - - 0.740 - - 0.740 - - 5.398 - - - - - 5.398 Remarks: The Program Office is under a Section 806 of the National Defense Authorization Act for Fiscal Year 1999 (Public Law 105-261) restriction to procure MK90 Propellant Grain from Radford Army Ammunition Plant to maintain a facility, producer, manufacturer, or supplier for an essential item of ammunition. The Radford Army Ammunition Plant (AAP) Industrial Facilities costs fund the operation and maintenance of the plant to include requirements for maintenance, security, safety, utilities, environmental compliance, and etc. These costs are part of the price of the MK90 grain used in the Hydra rocket motor; therefore, these costs fluctuate as quantities fluctuate. Support - Production Engineering Cost and Support - Program Management Cost are captured on E37412 / AMMO-Hydra, Aviation Rocket Procurement, Unguided line. The Guided unit cost decrease from FY 2026 to FY 2027 is due to higher quantities procured. (†) indicates the presence of a P-5a LI 3246E37300 - Rocket, Hydra 70, All Types Army UNCLASSIFIED Page 12 of 13 P-1 Line #23 Volume 1 - 583 === page 616 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 45 Item Number / Title [DODIC]: E37413 / Aviation Rocket Procurement, Guided FY Contractor and Location Method/Type or Funding Vehicle Complete Round, Guidance Section 2024 BAE Systems / Nashua, NH SS / FFP Pax River, MD Dec 2023 Feb 2025 714 24,345.66 Y Jul 2018 Complete Round, Guidance Section 2025 BAE Systems / Nashua, NH SS / FFP Pax River, MD Aug 2025 Jul 2026 20 30,039.00 Y Sep 2023 2026 BAE Systems / Nashua, NH SS / FFP Pax River, MD May 2026 Apr 2027 19 31,773.00 Y Sep 2023 2027 BAE Systems / Nashua, NH SS / FFP Pax River, MD May 2027 Apr 2028 140 32,888.00 Y Sep 2023 Cost Elements Complete Round, Guidance Section O O C P-1 Line Item Number / Title: 3246E37300 / Rocket, Hydra 70, All Types ✓ Complete Round, Guidance Section Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date Remarks: - QTY EA for delivery schedule. - Contract managed by Navy - SS / FFP: Sole Source / Firm Fixed Price LI 3246E37300 - Rocket, Hydra 70, All Types Army UNCLASSIFIED Page 13 of 13 P-1 Line #23 Volume 1 - 584 === page 617 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition P-1 Line Item Number / Title: 2420E61000 / CAD/PAD, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 183.908 183.908 183.908 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 6.571 12.543 11.615 - 11.615 11.602 11.664 11.654 11.770 - - - - - - - - - - - 6.571 12.543 11.615 - 11.615 11.602 11.664 11.654 11.770 - - - - - - - - - - - 6.571 12.543 11.615 - 11.615 11.602 11.664 11.654 11.770 - Total 261.327 261.327 261.327 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line is for safety critical Cartridge Actuated Devices (CAD) and Propellant Actuated Devices (PAD), which are used on rotary winged Army aircraft. CAD/PADs support aircraft escape, fire suppression, and jettison systems. Items are subject to shelf and service life restrictions and, therefore, require replacement at specified intervals. CAD/PAD devices are procured in accordance with their shelf/service life and are made up of, but not limited to: MS81-87 Shielded Det Cord; MS94-97 Canopy Egress Assembly; MS91-92 Flexible Det Cord; MT06/DWEA Initiator Cartridge; SP02/03 Det Cord Assembly; WB53/MT20/TY60 Fire Bottle Cartridge; MD66/JM92 Stores Release Cartridge; MJ20 Thruster Assembly and Cartridge; MJ20 Inert Thruster without Cartridge; MJ21 Impulse Cartridge; MU02 Hoist Cutter Cartridge; MU34 Hoist Refire Kit; M514 Hoist Cutter Cartridge; DWGS Cable Cutter Assembly; JM96 Chinook Impulse Cartridge; MD65 Initiator Cartridge Air Volcano stores release. CAD/PAD Procurements are awarded by the Navy Contracting Center in Mechanicsburg, PA, the Army Contracting Command in Rock Island, IL, and the Naval Surface Warfare Center (NSWC) in Indian Head. LI 2420E61000 - CAD/PAD, All Types Army UNCLASSIFIED Page 1 of 8 P-1 Line #24 Volume 1 - 585 === page 618 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition P-1 Line Item Number / Title: 2420E61000 / CAD/PAD, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 EA0003 / CAD/PAD, All Other P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 183.908 - / 6.571 - / 12.543 - / 11.615 - / - - / 11.615 - / 183.908 - / 6.571 - / 12.543 - / 11.615 - / - - / 11.615 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 Budget supports critical Army Title 10 war reserve/operational, training, and test requirements in accordance with DoDI 3000.04 (Munitions Requirements Process) and Army Regulation 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War (OSW) approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), these items are necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. FY 2027 Total Base procurement dollars of $11.615 million will be used for procurement of various CAD/PADs that need replacement due to limited shelf life and/or install life. The FY 2027 program is required to ensure availability of replacement items when needed or for mandatory "time-change" procedures for already installed devices to avoid grounding aircraft or rendering aircraft partially mission capable. This funding is required to support fleet requirements that take into account the aircraft inventory, maintenance cycle, shelf/install life, procurement lead-times, and expenditures. Due to the variability of these factors, actual CAD/PAD end items and the quantities procured may vary. LI 2420E61000 - CAD/PAD, All Types Army UNCLASSIFIED Page 2 of 8 P-1 Line #24 Volume 1 - 586 === page 619 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2420E61000 / CAD/PAD, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: EA0003 / CAD/PAD, All Other MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 6.571 12.543 11.615 - 11.615 - Gross/Weapon System Cost ($ in Millions) 183.908 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 183.908 Plus CY Advance Procurement ($ in Millions) - - - - - 6.571 12.543 11.615 - 11.615 - Total Obligation Authority ($ in Millions) 183.908 FY 2027 Total - - - - - 6.571 12.543 11.615 - 11.615 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost MS81 Shielded Det 1,179.65 675 0.796 2,190.00 90 0.197 - - - 1,143.10 800 0.914 2,190.00 90 0.197 - - - 1,160.67 725 0.841 2,190.00 90 0.197 - - - 1,143.10 800 0.914 - - - - - 1,161.35 726 0.843 2,190.00 90 0.197 - - - 1,161.35 726 0.843 2,190.00 90 0.197 100 0.270 JN79 Canopy Egress Assembly 9,622.73 132 1.270 - - - - - - JN80 Canopy Egress Assembly 9,622.73 132 1.270 - - - - - JN81 Canopy Egress Assembly 9,622.73 132 1.270 - - - - JN82 Canopy Egress Assembly 9,622.73 132 1.270 - - - XW55 Delay Initiator 1,251.56 751 0.940 - - - Cord (†) MS82 Shielded Det Cord (†) MS83 Shielded Det Cord (†) MS85 Shielded Det Cord MS86 Shielded Det Cord (†) MS87 Shielded Det Cord (†) LI 2420E61000 - CAD/PAD, All Types Army - 100 0.297 - - - - - - - - 100 0.297 - - - - - - - - 2,970.00 100 0.297 - - - 2,970.00 200 0.594 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2,700.00 UNCLASSIFIED Page 3 of 8 2,970.00 2,970.00 - 100 0.297 - - 100 0.297 - - 2,970.00 100 0.297 2,970.00 200 0.594 - - - - - - - - - - - - - - - - - - - - - - - - P-1 Line #24 2,970.00 2,970.00 - Volume 1 - 587 === page 620 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2420E61000 / CAD/PAD, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: EA0003 / CAD/PAD, All Other MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements MJ21 Impulse Unit Cost ($) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) 446.60 800 0.357 1,171.00 144 0.169 3,351.87 724 2.427 7,497.16 80 0.600 3,433.35 836 2.870 - - 3,497.97 831 2.907 - 3,651.00 758 2.767 872.84 630 0.550 (†) 1,722.44 600 1.033 (†) 1,452.94 1,050 (†) 799.32 TY60 Chinook Fire Bottle Cartridge SP02/03 UEES Det Cord Assembly Cartridge (†) MS94 Window Cutting Assembly (†) MS95 Window Cutting Assembly (†) MS96 Window Cutting Assembly (†) MS97 Window Cutting Assembly (†) DWEA Initiator Cartridge MS91 Canopy Removal FCDC MS92 Canopy Removal FCDC JM96 Chinook Impulse Cartridge MT06 Initiator (†) JAU-59A MT20 Ctg Aircraft Fire (†) Extinguisher WB53 Ctg Aircraft Fire (†) Extinguisher MD65 Release Cartridge - FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) (Each) ($ M) ($) Total Cost Qty (Each) ($ M) 0.322 - - - 1,288.10 250 0.322 7,497.16 250 1.874 8,246.88 120 0.990 - - - 8,246.88 120 0.990 - 7,497.16 200 1.499 8,246.88 120 0.990 - - - 8,246.88 120 0.990 - - 7,497.16 200 1.499 8,246.88 120 0.990 - - - 8,246.88 120 0.990 - - - 7,497.16 200 1.499 8,246.88 120 0.990 - - - 8,246.88 120 0.990 - - - - - - - - - - - - - 5,993.00 172 1.031 - - - 6,690.09 100 0.669 - - - 6,690.09 100 0.669 1.526 5,340.50 72 0.385 654 3.493 5,874.55 300 1.762 - - - 5,874.55 300 1.762 1,086 0.868 988.88 50 0.049 - - - - - - - - - - - - 600.00 225 0.135 - - - - - - - - - - - - - - - 988.61 163 0.161 - - - - - - - - - - - - - - - 1,708.38 830 1.418 2,447.00 100 0.245 - - - - - - - - - - - - 500.00 418 0.209 811.70 550 0.446 - - - 892.87 300 0.268 - - - 892.87 300 0.268 397.81 2,370 0.943 434.00 570 0.247 477.40 300 0.143 525.14 300 0.158 - - - 525.14 300 0.158 - - - - - - - - - - - - - - - 5,340.50 1,292.95 376 0.486 2,909.50 200 0.582 2,909.50 200 0.582 (†) 1,365.44 376 0.513 3,575.00 200 0.715 3,575.00 200 0.715 52.20 500 0.026 - - - 120.00 2,000 0.240 MS94 Window Cutting Assembly - DO1 4,649.00 100 0.465 - - - - - MS95 Window Cutting Assembly - DO1 4,649.00 100 0.465 - - - - - (†) ($) Unit Cost 250 0.035 Cartridge ($ M) Qty 1,288.10 1,700 MD66 Release (Each) Unit Cost - 20.46 SP03 TLX Line Qty FY 2027 Total Total Cost - (†) SP02 TLX Line FY 2027 OOC Total Cost LI 2420E61000 - CAD/PAD, All Types Army - - - - - 200 0.787 - - - - - - - - - - - - - - - - - - - - - UNCLASSIFIED Page 4 of 8 - 3,932.50 P-1 Line #24 - - - - 200 0.787 - - - - - - - - - - - 3,932.50 Volume 1 - 588 === page 621 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2420E61000 / CAD/PAD, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: EA0003 / CAD/PAD, All Other MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) MS96 Window Cutting Assembly - DO1 4,649.00 100 0.465 - - - - - - - - - - - - - - - MS97 Window Cutting Assembly - DO1 4,649.00 100 0.465 - - - - - - - - - - - - - - - WB53 Ctg Aircraft Fire Extinguisher - DO5 413.00 301 0.124 - - - - - - - - - - - - - - - WB53 Ctg Aircraft Fire Extinguisher - DO6 427.45 350 0.150 - - - - - - - - - - - - - - - MS92 Canopy Removal FCDC - DO2 2,676.35 50 0.134 - - - - - - - - - - - - - - - MS94 Window Cutting Assembly - DO3 6,500.40 30 0.195 - - - - - - - - - - - - - - - MS95 Window Cutting Assembly - DO3 6,500.40 50 0.325 - - - - - - - - - - - - - - - MS97 Window Cutting Assembly - DO3 6,500.40 50 0.325 - - - - - - - - - - - - - - - - - - - - 50 0.164 - - - - - - - - - DWGS Cable Cutter Assembly (†) - 3,283.04 MS94 Window Cutting Assembly - Option #1 6,196.00 95 0.589 - - - - - - - - - - - - - - - MS95 Window Cutting Assembly - Option #1 6,196.00 75 0.465 - - - - - - - - - - - - - - - MS96 Window Cutting Assembly - Option #1 6,196.00 75 0.465 - - - - - - - - - - - - - - - 6,196.00 13 0.081 62 0.384 - - - - - - - - - - - - - - - - - - - - - 768.65 400 0.307 - - - 768.65 400 0.307 (†) - - - - - - - - - 2,508.60 250 0.627 - - - 2,508.60 250 0.627 Subtotal: Recurring Cost - - 35.117 - - 5.838 - - 11.980 - - 10.343 - - - - - 10.343 Prior Years (Multiple DODICs) - - 132.250 - - - - - - - - - - - - - - - MJ20/MJ21 Decoupling Project - - 0.487 - - - - - - - - - - - - - - - MD66 PIP for JM92 - - 0.212 - - - - - - - - - - - - - - - JN79-82 Startup Costs - - 1.142 - - - - - - - - - - - - - - - MS97 Window Cutting Assembly - Option #1 (†) JM92 - Impulse Cartridge (†) MJ20 - Inert Thruster 6,196.00 Non Recurring Cost LI 2420E61000 - CAD/PAD, All Types Army UNCLASSIFIED Page 5 of 8 P-1 Line #24 Volume 1 - 589 === page 622 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2420E61000 / CAD/PAD, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: EA0003 / CAD/PAD, All Other MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) UEES PIP Procurements - - 3.071 - - - - - - - - - - - - - - - JM96 & MJ20 Fixtures - - 0.075 - - 0.520 - - - - - - - - - - - - FCDC MS91/92 and SP02/03 - - - - - 0.120 - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 137.237 - - 0.640 - - - - - - - - - - - - - - 172.354 - - 6.478 - - 11.980 - - 10.343 - - - - - 10.343 - - 3.466 - - - - - - - - - - - - - - - - - 3.466 - - - - - - - - - - - - - - - Hardware Analysis - - 0.803 - - - - - - - - - - - - - - - Subtotal: Support Hardware Analysis Cost - - 0.803 - - - - - - - - - - - - - - - Subtotal: Hardware Cost Support - Congressional Adjustments Cost Congressional Rescission Subtotal: Support Congressional Adjustments Cost Support - Hardware Analysis Cost Support - Production Engineering Cost Production Engineering - - 7.286 - - 0.093 - - 0.563 - - 1.272 - - - - - 1.272 Subtotal: Support Production Engineering Cost - - 7.286 - - 0.093 - - 0.563 - - 1.272 - - - - - 1.272 Gross/Weapon System Cost - - 183.908 - - 6.571 - - 12.543 - - 11.615 - - - - - 11.615 Remarks: All CAD/PADs requirements are determined by analyzing number of Army aircraft, on-hand inventory, actual expenditures, shelf life, install life, expiration dates, procurement lead times, and projected contract delivery dates. The number of CAD/PADs procured is to ensure adequate assets are available for fleet support and operational readiness. Footnotes: 1) Production Engineering funding provided to Naval Surface Warfare Center - Indian Head Explosive Ordinance Disposal Technology Division. (†) indicates the presence of a P-5a LI 2420E61000 - CAD/PAD, All Types Army UNCLASSIFIED Page 6 of 8 P-1 Line #24 Volume 1 - 590 === page 623 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Item Number / Title [DODIC]: EA0003 / CAD/PAD, All Other FY Contractor and Location Method/Type or Funding Vehicle MS81 Shielded Det Cord 2025 Pacific Scientic / Hollister, CA Option / FFP NAVSUP Jul 2025 Jul 2026 90 2,190.00 Y MS81 Shielded Det Cord 2027 TBD / TBD C / FFP NAVSUP Mar 2027 Mar 2028 100 2,970.00 Y MS82 Shielded Det Cord 2025 Pacific Scientic / Hollister, CA Option / FFP NAVSUP Jul 2025 Jul 2026 90 2,190.00 Y MS83 Shielded Det Cord 2025 Pacific Scientic / Hollister, CA Option / FFP NAVSUP Jul 2025 Jul 2026 90 2,190.00 Y MS83 Shielded Det Cord 2027 TBD / TBD C / FFP NAVSUP Mar 2027 Mar 2028 100 2,970.00 Y MS86 Shielded Det Cord 2025 Pacific Scientic / Hollister, CA Option / FFP NAVSUP Jul 2025 Jul 2026 90 2,190.00 Y MS86 Shielded Det Cord 2027 TBD / TBD C / FFP NAVSUP Mar 2027 Mar 2028 100 2,970.00 Y MS87 Shielded Det Cord 2025 Pacific Scientic / Hollister, CA Option / FFP NAVSUP Jul 2025 Jul 2026 90 2,190.00 Y MS87 Shielded Det Cord 2026 TBD / TBD C / FFP NAVSUP Dec 2026 Dec 2027 100 2,700.00 Y MS87 Shielded Det Cord 2027 TBD / TBD C / FFP NAVSUP Mar 2027 Mar 2028 200 2,970.00 Y MJ21 Impulse Cartridge 2025 Pacific Scientic / Hollister, CA C / FFP NAVSUP Feb 2026 Feb 2027 144 1,171.00 N MJ21 Impulse Cartridge 2027 TBD / TBD C / FFP NAVSUP Mar 2027 Mar 2028 250 1,288.10 Y MS94 Window Cutting Assembly 2025 TBD / TBD C / FFP NAVSUP Nov 2026 Nov 2027 80 7,497.16 Y MS94 Window Cutting Assembly 2026 TBD / TBD C / FFP NAVSUP Nov 2026 Nov 2027 250 7,497.16 Y MS94 Window Cutting Assembly 2027 TBD / TBD C / FFP NAVSUP Mar 2027 Mar 2028 120 8,246.88 Y MS95 Window Cutting Assembly 2026 TBD / TBD C / FFP NAVSUP Nov 2026 Nov 2027 200 7,497.16 Y MS95 Window Cutting Assembly 2027 TBD / TBD C / FFP NAVSUP Mar 2027 Mar 2028 120 8,246.88 Y MS96 Window Cutting Assembly 2026 TBD / TBD C / FFP NAVSUP Nov 2026 Nov 2027 200 7,497.16 Y MS96 Window Cutting Assembly 2027 TBD / TBD C / FFP NAVSUP Mar 2027 Mar 2028 120 8,246.88 Y MS97 Window Cutting Assembly 2026 TBD / TBD C / FFP NAVSUP Nov 2026 Nov 2027 200 7,497.16 Y MS97 Window Cutting Assembly 2027 TBD / TBD C / FFP NAVSUP Mar 2027 Mar 2028 120 8,246.88 Y MS91 Canopy Removal FCDC 2025 TBD / TBD C / FFP ACC-RI Dec 2026 Dec 2027 172 5,993.00 Y MS91 Canopy Removal FCDC 2027 TBD / TBD C / FFP ACC-RI Mar 2027 Mar 2028 100 6,690.09 Y MS92 Canopy Removal FCDC 2025 TBD / TBD C / FFP ACC-RI Dec 2026 Dec 2027 72 5,340.50 Y MS92 Canopy Removal FCDC 2026 TBD / TBD C / FFP ACC-RI Dec 2026 Dec 2027 654 5,340.50 Y MS92 Canopy Removal FCDC 2027 TBD / TBD C / FFP ACC-RI Mar 2027 Mar 2028 300 5,874.55 Y 2025 Applied Energy Technology Corp. / Burton, TX C / FFP NAVSUP Jan 2026 Jan 2027 50 988.88 N 2025 Rockwell Collins Inc. / Cedar Rapids, IA C / FFP NAVSUP Dec 2025 Dec 2026 100 2,447.00 N MT20 Ctg Aircraft Fire Extinguisher 2025 TBD / TBD C / FFP ACC-RI Sep 2026 Sep 2027 550 811.70 Y MT20 Ctg Aircraft Fire Extinguisher 2027 TBD / TBD C / FFP ACC-RI Mar 2027 Mar 2028 300 892.87 Y 2025 AMETEK AMERON, LLC / Baldwin Park, CA C / FFP NAVSUP Sep 2025 Sep 2026 570 434.00 Y 2026 TBD / TBD C / FFP NAVSUP Aug 2026 Aug 2027 300 477.40 Y Cost Elements JM96 Chinook Impulse Cartridge MT06 Initiator JAU-59A WB53 Ctg Aircraft Fire Extinguisher WB53 Ctg Aircraft Fire Extinguisher O O C P-1 Line Item Number / Title: 2420E61000 / CAD/PAD, All Types LI 2420E61000 - CAD/PAD, All Types Army Location of PCO UNCLASSIFIED Page 7 of 8 Award Date Date of First Delivery P-1 Line #24 Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date Volume 1 - 591 === page 624 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Item Number / Title [DODIC]: EA0003 / CAD/PAD, All Other FY Contractor and Location Method/Type or Funding Vehicle WB53 Ctg Aircraft Fire Extinguisher 2027 TBD / TBD C / FFP NAVSUP Mar 2027 Mar 2028 300 525.14 Y SP02 TLX Line 2025 TBD / TBD C / FFP NAVSUP Jun 2026 Jun 2027 200 2,909.50 Y SP02 TLX Line 2026 TBD / TBD C / FFP ACC-RI Aug 2026 Aug 2027 200 2,909.50 Y SP03 TLX Line 2025 TBD / TBD C / FFP NAVSUP Jun 2026 Jun 2027 200 3,575.00 Y SP03 TLX Line 2026 TBD / TBD C / FFP ACC-RI Aug 2026 Aug 2027 200 3,575.00 Y SP03 TLX Line 2027 TBD / TBD C / FFP ACC-RI Mar 2027 Mar 2028 200 3,932.50 Y MD66 Release Cartridge 2026 TBD / TBD C / FFP ACC-RI Oct 2026 Oct 2027 2,000 120.00 Y DWGS Cable Cutter Assembly 2026 TBD / TBD C / FFP NAVSUP May 2026 May 2027 50 3,283.04 N MS97 Window Cutting Assembly Option #1 2025 Pacific Scientic / Hollister, CA Option / FFP NAVSUP Aug 2025 Aug 2026 62 6,196.00 N JM92 - Impulse Cartridge 2027 TBD / TBD C / FFP NAVSUP Mar 2027 Mar 2028 400 768.65 Y MJ20 - Inert Thruster 2027 TBD / TBD C / FFP NAVSUP Mar 2027 Mar 2028 250 2,508.60 Y Cost Elements O O C P-1 Line Item Number / Title: 2420E61000 / CAD/PAD, All Types Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty (Each) RFP Issue Date Remarks: Contract award and First Delivery projections provided by Naval Surface Warfare Center (NSWC) at Indian Head which awards all procurement contracts for this program. This funding is required to support fleet requirements that take into account the aircraft inventory, maintenance cycle, shelf/install life, procurement lead-times, and expenditures. Due to the variability of these factors, actual CAD/PAD end items procured may vary. FY2025 contract award for MS91-92 Canopy Removal FCDC slated for DEC 26 to achieve economies of scale/better buying power with FY2026 requirements. FY2025 contract award for MS94 Window Cutting Assembly slated for NOV 26 to achieve economies of scale/better buying power with FY2026 requirements. LI 2420E61000 - CAD/PAD, All Types Army UNCLASSIFIED Page 8 of 8 P-1 Line #24 Volume 1 - 592 === page 625 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 21.409 21.691 - 21.691 19.517 14.955 14.580 14.230 - - - - - - - - - - 21.409 21.691 - 21.691 19.517 14.955 14.580 14.230 - - - - - - - - - - 21.409 21.691 - 21.691 19.517 14.955 14.580 14.230 - 832.372 832.372 832.372 148.171 148.171 148.171 To FY 2031 Complete Total 1,086.925 1,086.925 1,086.925 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line includes Demolition Munitions, All Types. (E45404) The M17A1 Receiver, Radio Frequency Remote Activation Munition System (RF-RAMS) is a single use item, which is capable of functioning non-electric blasting caps or detonation cord. The M17A1 provides the un-tethered capability to wirelessly function/initiate demolition charges or munitions up to and beyond 5 KM line-of-sight/non-line-of-sight, once it receives the correct programmed coded signal from the RF-RAMS transmitter. The Receiver is programmed in the field by an RF-RAMS Transmitter and subsequently responds only to that transmitter. This item is Code A, approved for service use. (E50601) Charge Demolition Block Comp C-4 1-1/4 LB M112 is the primary demolition explosive used by the U.S. Army. The M112 Demolition Block is used for general demolition and, in particular, for destruction of captured enemy ammunition. The block demolition charge consists of 1-1/4 pounds of composition C-4 plastic explosive packed in a mylar-film bag. Pressure sensitive adhesive tape is provided on one of the rectangular surfaces, allowing quick emplacement by the individual soldier on the object to be destroyed. The explosive may be cut and/or removed from its wrapper and hand molded into a desired shape suited to the target. Upon detonation, the shock wave destroys the target by cutting, breaching or cratering. This item is Code A, approved for service use. (E50703) Bangalore Torpedo 2.5 FT M1A3 is used to clear paths through barbed wire entanglements and minefields. Bangalore torpedoes are also used for clearing heavy undergrowth of bamboo and may also be used as a cratering charge, especially in connection with shaped charges against reinforced concrete targets. The Bangalore Torpedo consist of eight (8) 2.5-foot tubes with eight (8 ea) connecting sleeves and two (2 ea) nose sleeves. Each tube is filled with a main charge of approximately 5.25 pounds of Composition B-4 explosive and a booster assembly, located at each end of the tube, contains 0.5 pounds of Composition A-3. The tubes are joined end-to-end by connecting sleeves until the desired length is attained. The total system length is 20 feet. This item is Code A, approved for service use. (E50800) 1/4 LB TNT (Tri Nitro Toluene) Block Demolition Charge is one of three TNT charges. TNT demolition charges have a high detonating velocity and are particularly well suited to cutting or breaching hard surface materials. When a charge is detonated, the explosive is converted into compressed gas. The gas exerts pressure in the form of a shock wave which demolishes the target by cutting, breaching, or cratering. The type of demolition achieved depends on the placement of the charge in relation to the target. Unlike the 1 pound and 1/2-pound versions, which are rectangular, the 1/4-pound block is issued in a cylindrical, waterproof, olive-drab cardboard container or an alternative plastic cylindrical container. The cardboard container design has metal ends with a threaded cap well in one end. The plastic designs also have one end with a threaded cap well in one end. This item is Code A, approved for service use. (E50804) / TRAINER, SELECTABLE LTWT ATTK MUNIT(SLAM) The M320A1 Selectable Lightweight Attack Munition (SLAM) Trainer is an inert, functional training device that replicates the operational characteristics of the M4A1 SLAM. The M4A1 is a hand-emplaced, multipurpose munition designed for portability and use against a variety of targets. The M320A1 is an interactive trainer that realistically LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 1 of 63 P-1 Line #25 Volume 1 - 593 === page 626 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A simulates the arming sequences and operational modes of the live M4A1 munition. It provides real-time feedback on arming and functioning status through an integrated user interface. This allows personnel to develop proficiency in SLAM employment procedures in a safe, controlled environment. By enabling repeated practice, the trainer optimizes training effectiveness and conserves the inventory of tactical M4A1 SLAM munitions. This item is Code A, approved for service use. (E51000) CHARGE, Demo Blk TNT 1 lb - TNT demolition charges have a high detonating velocity and are particularly well suited to cutting or breaching hard surface materials. When a charge is detonated, the explosive is converted into compressed gas. The gas exerts pressure in the form of a shock wave which demolishes the target by cutting, breaching, or cratering. The type of demolition achieved depends on the placement of the charge in relation to the target. The 1-pound block is issued in a rectangular, waterproof, olive-drab plastic cylindrical container. The plastic designs have one end with a threaded cap well in one end. This item is Code A, approved for service use. (E51300) 40LB Cratering Demolition Block Charge is a demolition charge designed to destroy roads, bridge abutments, runways, buildings, fortifications and other concrete structures. It uses a low velocity explosive which destroys by a lifting and heaving motion rather than the cutting action of high velocity charges. The 40 lb. Cratering Charge contains 39 pounds of Composition H-6 Explosive loaded in a steel cylinder. It is approximately 7 inches in diameter and 20 inches tall and packed in an M18A2 container. The H-6 explosive has a relatively low detonating velocity and is therefore unsuitable for cutting and breaching operations. This item is Code A, approved for service use (E51400) M186 Demolition Charge is a 50-foot roll of flexible explosive. It is 3 inches wide and 1/4 inch thick. It can be easily cut and formed into various shapes and is primarily used as a cutting charge. This item is Code A, approved for service use. (E52000) The M4A1 Selectable Light Weight Attack Munition (SLAM) is a multipurpose munition designed to be readily portable and hand-emplaced against lightly armored vehicles, parked aircraft, wheeled or tracked support vehicles, and ammunition or fuel storage sites. The SLAM can be used either day or night during all weather conditions. Man-in-the-loop is required in all attack modes. The improved M4A1 SLAM has several producibility and safety enhancements; these include charges to the mode/time selector switch, housing base and cover assembly and passive sensor assembly. A battery bleed resistor was added for improved safety. This item is Code A, approved for service use. (E52400) Inert Non-Electric Blasting Caps are used for demonstration and for training in demolition work requiring nonelectric blasting cap. Its only purpose is for demonstration and to give the operator the feel and training in the use of blasting caps. This item is Code A, approved for service use. (E52500) Cap Blasting Electric M6 is used to initiate high explosives. It is initiated by an electrical charge from a blasting machine or other source of electric power. Blasting cap M6 consists of a base charge of Rapid Detonating Explosive (RDX), an intermediate charge of lead azide and an ignition charge of smokeless powder, potassium chlorate and lead salt of dinitro cresol in an aluminum alloy cup. Two 12-foot lead wires, connected by a bridge wire in the ignition charge, extend through a rubber plug assembly in the open end of the cup. This item is Code A, approved for service use. (E52600) Cap Blasting M7 is used to initiate high explosives. The M7 consists of an aluminum alloy cup containing an ignition charge of lead styphnate, an intermediate charge of lead azide, and a base charge of RDX. The M7 is initiated with time blasting fuse and a M81 Igniter. This item is Code A, approved for service use. (E53100) Charge Demolition Shaped M2 15 pound are shaped so as to concentrate their explosive force in a particular direction. It is used to blast craters in paved and unpaved roads and to bore holes in metals, masonry or concrete. It contains a 6-inch stand-off, 11.5-pound Composition B explosive main charge and 0.11-pound Composition A3 booster. This item is Code A, approved for service use. (E53200) Charge Demolition Shaped M3 40 pound are shaped so as to concentrate their explosive force in a particular direction. It is used to blast craters in paved and unpaved roads and to bore holes in metals, masonry or concrete. It contains a 15-inch stand-off, 29.5-pound Comp B main charge and a 0.11-pound Comp A3 booster. This item is Code A, approved for service use. (E54100) Detonating Cord is used to prime and detonate explosive charges. Unlike the time fuze, which burns slowly, detonating cord burns almost instantaneously. It is used to link a series of near simultaneous charges. The Type 1, Class E detonating cord consists of a core of high velocity explosive in a seamless textile tube. The tube is covered with a thin layer of asphalt and sheathed in an outer cover of plastic-coated textile. The plastic outer cover is smooth and colored olive drab. This item is Code A, approved for service use. LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 2 of 63 P-1 Line #25 Volume 1 - 594 === page 627 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A (E54200) CORD DETONATING INERT - The M458 Inert Detonating Cord is similar to the M456 Type 1E in construction and external appearance, consists of an asphalt-coated cotton tube sheathed in an outer cover of smooth plastic-coated rayon. The Inert cord differs from the service cord in that the cord of the training item is inert loaded with poly-vinyl chloride (PVC) filler and the plastic outer is blue. This item is Code A, approved for service use. (E60200) Cutter CTG Actuated 2 Sec Delay M21 is a cartridge actuated device that is used in aerial delivery systems for cargo. It severs a reefing line which allows a parachute to fully deploy. The cutter is installed in a mounting bracket which is attached to the parachute. Major components consist of a case, firing pin assembly, lanyard, knife assembly, delay assembly, and cotter pin. This item is Code A, approved for service use. (E78201) Charge Demolition M980 Sheet Explosive, PBXW-202 is a 20 pound, 38 foot roll of flexible explosive. It is 10 inches wide and .083 inches thick. It can be easily cut and formed into various shapes and is primarily used as a cutting charge. This item is Code A, approved for service use. (E81302) Cap Blasting Non-Elec, W/30 ft. Shock Tube is part of the family of Modernized Demolition Initiators (MDI). It consists of a blasting cap which is factory sealed to a length of shock tube. The tube is activated using an M81 igniter. A shock wave travels the length of the tube, with a delay measured in milliseconds, and ignites the blasting cap which in turn initiates the main charge. The MDI is not susceptible to electrostatic discharge or Radio Frequency (RF) jamming. The 30-foot length is generally used as a linking charge for a series of demolitions. This item is Code A, approved for service use. (E81305) ) Non-Elec Delay Blast Cap M14 is part of the family of Modernized Demolition Initiators (MDI). This item is used as a branch line to a primed charge or as a transmission line to facilitate the blast wave. The M11 can be used to ignite the M11/M16, M12/M13, M151/M152 or detonating cord. It is a high strength cap (equal to or better than #12 commercial cap) factory crimped to a 30 foot length of shock tube. The opposite end has a factory sealed crimp to protect it from moisture. The M11 has two flags; a YELLOW flag (2 meters from the cap) and a RED flag (1 meter from the cap). The M11 also has a special plastic connector (called a "J" hook), which facilitates quick and easy attachment onto a detonating cord (e.g., a ring main). This item is Code A, approved for service use. (E81307) Igniter, Time Fuse and Shock Tube, M81 is part of the family of Modernized Demolition Initiators (MDI). The M81 is a device, hand held by the individual Soldier, with a small primer charge that will activate the M700 Time Fuse as well as a shock tube. It is the primary device for all non-electrical demolition initiation. This item is Code A, approved for service use. (E83411) The Canine Explosive Scent Kit (CESK) consists of eight (8 ea.) energetics and will provide an enhanced training capability for Military Working Dog (MWD) Teams. The energetics/scents will be stored/ transported individually within a Pelican 1150 case. The Pelican 1150 case will have three (3ea) Training Aid Delivery Devices (TADDs) for that particular energetic. There will be eight (8 ea) Pelican 1150 cases in one (1 ea) Pelican iM2875 case. For replenishment of the energetics/scents, the individual energetics/scents will be stored/transported within an M19A1 metal container. The CESK provides Military Working Dog (MWD) teams relevant materials used to construct explosive devices employed against U.S. Forces. This item is Code A, approved for service use. (E99901) Cap, Blasting, Non-Electric, 200 Ft Minitube, M19 is part of the family of Modernized Demolition Initiators (MDI). It consists of a dual initiating component used to activate standard military explosives and demolition devices. The MDI is not susceptible to electrostatic discharge or Radio Frequency (RF) jamming. This item is Code A, approved for service use. (E99903) Blast Cap, Non-Elec: 500Ft Minitube, M21 is part of the family of Modernized Demolition Initiators (MDI). It consists of an initiating component used to activate standard military explosives and demolition devices. The MDI is not susceptible to electrostatic discharge or Radio Frequency (RF) jamming. This item is Code A, approved for service use. (E99905) Blast Cap, Non-Elec, 1000Ft Minitube, M23 is part of the family of Modernized Demolition Initiators (MDI). It consists of an initiating component used to activate standard military explosives and demolition devices. The MDI is not susceptible to electrostatic discharge or Radio Frequency (RF) jamming. This item is Code A, approved for service use. LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 3 of 63 P-1 Line #25 Volume 1 - 595 === page 628 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 E45404 / Receiver, Radio Firing-Remote Actv MunSys(RF-RAMS) [MP47] P-5a A P-5 E50601 / CHARGE, Demo Blk Comp C-4 1-1/4 lb, M112 [M023] P-5a A P-5 E50703 / DEMO KIT, BANGALORE TORPEDO, M1A3 (2.5 foot) [MP03] P-5a A P-5 E50800 / CHARGE, Demo Blk TNT 1/4 lb [M030] P-5a A P-5 E50804 / TRAINER, SELECTABLE LTWT ATTK MUNIT(SLAM), M320A1 [MZ40] P-5 E51000 / CHARGE, Demo Blk TNT 1 lb P-5a A P-5 E51300 / CHARGE, Demo Cratering 40 lb [M039] P-5a P-5 E51400 / CHARGE, Demo, (50ft), Sheet Explosive, M186 [M060] P-5 E52000 / MUNITION, Selectable Lightweight Attack (SLAM), M4 [MP12] P-5a A P-5 E52400 / CAP BLASTING NON-ELEC INERT P-5a A - / 0.717 P-5 E52500 / CAP, Blasting Elec, M6 [M130] P-5a A - / 21.501 - / 1.627 P-5 E52600 / CAP BLASTING NON-ELEC M7 P-5a A - / 11.653 - / 0.978 - / 0.588 - P-5 E53100 / CHARGE, Demo Shaped 15 lb, M2 P-5a A - / 27.265 / - - / 1.438 - P-5 E53200 / CHARGE, Demo Shaped 40 lb, M3 P-5a A - / 31.400 - / 0.800 - / 2.280 - P-5 E54100 / CORD, Detonating Type 1 [M456] P-5a A - / 47.728 - / 2.592 - / 2.570 P-5 E54200 / CORD DETONATING INERT P-5a A - / 1.672 - / 0.206 - P-5 E60200 / CUTTER, Cartridge Actuated, M21, 2 Second Delay [M500] P-5a A - / 62.130 / - - P-5 E78201 / CHARGE, Demo (38FT) Sheet Explosive, PBXW-202 [M980] P-5a A - / 12.199 - / 1.221 P-5 E81302 / CAP, Blasting Non-Elec, w/30Ft Shock Tube [ML47] P-5a A - / 12.841 - / 0.222 P-5 E81305 / CAP BLASTING NON-ELEC, DELAY, M14 [MN06] P-5a A - / 15.248 - / 0.975 P-5 E81307 / IGNITER, Time Fuze and Shock Tube, M81 [MN08] P-5a A - / 25.954 - / 0.575 - P-5 E83411 / SCENT KIT, CANINE: EXPLOSIVE (CESK) P-5a A / - - P-5 E99901 / Cap, Blasting, Non-Electric, 200 Ft Minitube, M19 P-5a A - / 8.569 - / 0.266 - / - - P-5 E99903 / CAP, Blasting Non-Elec, w/500Ft Minitube, M21 [MN88] P-5a A - / 33.894 - / 3.922 - / - - P-5 E99905 / CAP, Blast, Non-Elec, 1000Ft Minitube, M23 [MN90] P-5a A - / 31.994 - / 0.935 - / - P-40 Total Gross/Weapon System Cost - / 832.372 / 21.409 - / 33.057 - / 0.829 - / 241.032 - / 84.992 - / 0.961 - / 1.978 - / 6.713 - / 1.879 - / - - - / 4.219 - / 4.914 - / - - / 7.261 - / 4.938 - / - A - / 64.694 - / 5.479 - / 2.765 A - / 24.357 - / 0.064 - / 0.063 - / 105.313 - A - - - - - - / 28.779 - / - - / - / 148.171 - / - - / - - / - / - - / - - / - - / - / 3.256 - / - / - - / - - / - - / - - / - - / - - / - - / - - - / 4.506 - / - - / 4.506 - / 0.063 - / - - / 0.063 / 3.185 - - - - / 3.256 / - - / - - / - / - - / - / 0.923 - / - - / 0.923 / 6.580 - / - - / 6.580 / 1.939 - / - - / 1.939 - / 2.635 - / - - / 2.635 / 0.105 - / 0.244 - / - - / 0.244 / 0.077 - / 0.182 - / - - / - - / - / 0.081 - / - - / - - / - - / - - - / - / 0.662 / 1.640 - - / / 0.391 - - / 5.363 - / / 0.662 - / - / 0.182 - - / / 0.081 / - - / - / 0.109 - / - - / 0.384 - / - - / - - / - - / - - / - - - / 0.127 - / - - / 0.127 - / 21.691 - / - - / 21.691 / 0.494 - / 0.450 - - / / 0.109 / 0.384 / / - *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 4 of 63 P-1 Line #25 Volume 1 - 596 === page 629 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A The FY 2027 Budget supports critical Army Title 10 war reserve/operational, training, and test requirements in accordance with Department of War Instruction 3000.04 (Munitions Requirements Process) and Army Regulation 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War (OSW) approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. FY 2027 Total Base dollars in the amount of $21.691 million supports procurement of fourteen variants of Demolitions. E45404 M17A1 Receiver, Radio Frequency Remote Activation Munition System (RF-RAMS) [MP47] This is a training standard item used in training and combat. The request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. There is no FY 2027 budget request for this item. TYPE CLASSIFICATION DATE: 2006 E50601 / CHARGE, Demo Blk Comp C-4 1-1/4 lb, M112 [M023] This is a training standard item used in training and combat. The request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. There is no FY 2027 budget request for this item. TYPE CLASSIFICATION DATE: 1964 E50703 DEMO KIT, BANGALORE TORPEDO, M1A3 (2.5 foot) [MP03] This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $3.256 million supports the production of 1,218 systems. FY 2026 to FY 2027 funding increase reflects procurement of ammunition needed to meet training and depot level requirements. TYPE CLASSIFICATION DATE: 1958 E50800 CHARGE, Demo Blk TNT 1/4 lb [M030] This is a training standard item used in training and combat. The request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. There is no FY 2027 budget request for this item. TYPE CLASSIFICATION DATE: 1958 E50804 / TRAINER, SELECTABLE LTWT ATTK MUNIT(SLAM) [MZ40] This is a training unique item, not used in combat. The request supports annual training and builds a depot level in accordance with the Army's procurement goal. There is no FY 2027 budget request for this item. TYPE CLASSIFICATION DATE: 2011 E51000 CHARGE, Demo Blk TNT 1 lb [M032] This is a training standard item used in training and combat. The request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. There is no FY 2027 budget request for this item. TYPE CLASSIFICATION DATE: 1958 E51300 40LB Cratering Demolition Block Charge [M039] LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 5 of 63 P-1 Line #25 Volume 1 - 597 === page 630 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $4.506 million supports the production of 1,747 systems. FY 2026 to FY 2027 funding increase reflects procurement of ammunition needed to meet training and depot level requirements. TYPE CLASSIFICATION DATE: 1958 E51400 M186 Demolition Charge [M060] This is a training standard item used in training and combat. FY 2027 request supports engineering for items in production. FY 2027 Base procurement dollars in the amount of $0.063 million provides engineering support for items in production. TYPE CLASSIFICATION DATE: 1968 E52000 / MUNITION, Selectable Lightweight Attack (SLAM), M4 [MP12] This is a training standard item used in training and combat. The request supports annual training and builds a depot level in accordance with the Army's procurement goal. There is no FY 2027 budget request for this item. TYPE CLASSIFICATION DATE: 2011 E52400 Blasting Cap Non-Elec Inert [M097] This is a training unique item, not used in combat. The FY 2027 request supports annual training and builds a depot level in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $0.662 million supports production of 25,247 caps. FY 2026 to FY 2027 funding increase reflects procurement of ammunition needed to meet training and depot level requirements. TYPE CLASSIFICATION DATE: 1978 E52500 / CAP, Blasting Elec, M6 [M130] This is a training standard item used in training and combat. The request supports annual training and builds a depot level in accordance with the Army's procurement goal. There is no FY 2027 budget request for this item. TYPE CLASSIFICATION DATE: January 1960 E52600 / CAP BLASTING NON-ELEC M7 [M131] This is a training standard item used in training and combat. The FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $0.923 million supports production of 18,821 caps. FY 2026 to FY 2027 funding increase reflects procurement of ammunition needed to meet training and depot level requirements. TYPE CLASSIFICATION DATE: 1960 E53100 15 lb. M2 Shaped Charge [M420] This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $6.580 million supports the production of 3,688 Demolition Shaped Charges. FY 2026 to FY 2027 funding increase reflects procurement of ammunition needed to meet training and depot level requirements. TYPE CLASSIFICATION DATE: 1967 E53200 Charge Demolition Shaped M3 [M421] This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $1.939 million supports the production of 662 Demolition Shaped Charges. FY 2026 to FY 2027 funding decrease reflects procurement of ammunition needed to meet training and depot level requirements. LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 6 of 63 P-1 Line #25 Volume 1 - 598 === page 631 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A TYPE CLASSIFICATION DATE: 1967 E54100 Detonating Cord, Type 1 [M456] This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $2.635 million supports the production of 4,724,700 feet of Detonating Cord. FY 2026 to FY 2027 funding increase reflects procurement of ammunition needed to meet training and depot level requirements. TYPE CLASSIFICATION DATE: 1958 E54200 CORD DETONATING INERT [M458] This is a training unique item not used in combat. The FY 2027 request supports annual training and builds a depot level inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $0.244 million supports the production of 380,652 feet of Detonating Cord INERT. FY 2026 to FY 2027 funding increase reflects procurement of ammunition needed to meet training and depot level requirements. TYPE CLASSIFICATION DATE: 1958 E60200 Cutter CTG Actuated 2 Sec delay M21 [M500] This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $0.182 million supports the production of 215 Cutters. FY 2026 to FY 2027 funding increase reflects procurement of ammunition needed to meet training and depot level requirements. TYPE CLASSIFICATION DATE: 1980 E78201 / CHARGE, Demo (38FT) Sheet Explosive, PBXW-202 [M980] This is a training standard item used in training and combat. The request supports annual training and builds a depot level in accordance with the Army's procurement goal. There is no FY 2027 budget request for this item. TYPE CLASSIFICATION DATE: EOD Item Navy Configured E81302 / CAP, Blasting Non-Elec, w/30Ft Shock Tube [ML47] This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $0.081 million provides engineering support for items in production. TYPE CLASSIFICATION DATE: April 1996 E81305 / CAP BLASTING NON-ELEC, DELAY, M14 [MN06] This is a training standard item used in training and combat. The request supports annual training and builds a depot level in accordance with the Army's procurement goal. There is no FY 2027 budget request for this item. TYPE CLASSIFICATION DATE: April 1996 E81307 Igniter, Time Fuze and Shock Tube, M81 [MN08] This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $0.109 million supports production of 3,057 Igniters. FY 2026 to FY 2027 funding decrease reflects procurement of ammunition needed to meet training and depot level requirements. TYPE CLASSIFICATION DATE: April 1996 E83411 Scent Kit, Canine: Explosive (CESK) LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 7 of 63 P-1 Line #25 Volume 1 - 599 === page 632 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A This is a training unique item not used in combat. FY 2027 request supports annual training and builds a depot level inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $0.384 million supports the production of 134 Canine Explosive Scent Kits. FY 2026 to FY 2027 funding decrease reflects procurement of ammunition needed to meet training and depot level requirements. Type Classification Date: N/A E99901 / Cap, Blasting, Non-Electric, 200 Ft Minitube, M19 [MN86] This is a training standard item used in training and combat. The request supports annual training and builds a depot level in accordance with the Army's procurement goal. There is no FY 2027 budget request for this item. TYPE CLASSIFICATION DATE: April 1996 E99903 Blast Cap, Non-Elec: 500Ft Minitube, M21 [MN88] This is a training standard item used in training and combat. The request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. There is no FY 2027 budget request for this item. TYPE CLASSIFICATION DATE: April 1996 E99905 Blast Cap, Non-Elec, 1000Ft Minitube, M23 (MN90) This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $0.127 million provides engineering support for items in production. E99905 is a New Start in FY 2027. TYPE CLASSIFICATION DATE: April 1996 LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 8 of 63 P-1 Line #25 Volume 1 - 600 === page 633 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E45404 / Receiver, Radio Firing-Remote Actv MunSys(RF-RAMS) [MP47] MDAP/MAIS Code: Resource Summary Prior Years FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - - Gross/Weapon System Cost ($ in Millions) 33.057 0.829 5.363 - - - Less PY Advance Procurement ($ in Millions) - - - - - - 33.057 0.829 5.363 - - - - - - - - - 33.057 0.829 5.363 - - - Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE 5,345 25.705 - - - - - 25.705 - - - - - 25.705 - - - First Article Test - - 0.327 - - Subtotal: Support Acceptance Testing Cost - - 0.327 - ROUND (†) 4,809.17 Subtotal: Recurring Cost Subtotal: Hardware Cost 5,611.50 733 4.113 - - - - - - - - - - - 4.113 - - - - - - - - - - - 4.113 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Support - Acceptance Testing Cost Support - Production Engineering Cost Production Engineering - - 7.025 - - 0.829 - - 1.250 - - - - - - - - - Subtotal: Support Production Engineering Cost - - 7.025 - - 0.829 - - 1.250 - - - - - - - - - Gross/Weapon System Cost - - 33.057 - - 0.829 - - 5.363 - - - - - - - - - (†) indicates the presence of a P-5a LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 9 of 63 P-1 Line #25 Volume 1 - 601 === page 634 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements COMPLETE ROUND O O C P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types FY Contractor and Location Method/Type or Funding Vehicle 2026 MNEMONICS, INC / MELBOURNE, FL Option / FFP LI 2790E55400 - Demolition Munitions, All Types Army Location of PCO PICATINNY ARSENAL, NJ UNCLASSIFIED Page 10 of 63 Item Number / Title [DODIC]: E45404 / Receiver, Radio Firing-Remote Actv MunSys(RF-RAMS) [MP47] Award Date Date of First Delivery Jan 2026 Sep 2027 P-1 Line #25 Qty (Each) 733 Specs Date Unit Cost Avail Revision Now? Available ($) 5,611.50 RFP Issue Date Y Volume 1 - 602 === page 635 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E50601 / CHARGE, Demo Blk Comp C-4 1-1/4 lb, M112 [M023] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - 84.992 - - - - - - - - - 84.992 - - - - - - - - - 84.992 - - - - - Gross/Weapon System Cost ($ in Millions) 241.032 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 241.032 Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) 241.032 FY 2026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost FY 2025 Total Cost Qty Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty ($) (Each) (Each) ($ M) 106.64 137,029 14.613 10.93 1,945,213 21.261 - - - - - - - - - - - - 1,198.27 180,879 216.742 23.89 2,567,681 61.342 - - - - - - - - - - - - Hardware Cost Recurring Cost LOAD, ASSEMBLE, (†) PACK (LAP) COMP C-4 CLASS 3 (†) Subtotal: Recurring Cost - - 231.355 - - 82.603 - - - - - - - - - - - - - - 231.355 - - 82.603 - - - - - - - - - - - - - - - - - 1.142 - - - - - - - - - - - - - - - - - 1.142 - - - - - - - - - - - - First Article Test - - 0.107 - - - - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 0.107 - - - - - - - - - - - - - - - Production Engineering - - 9.553 - - 1.247 - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - 9.553 - - 1.247 - - - - - - - - - - - - - - 0.017 - - - - - - - - - - - - - - - Subtotal: Hardware Cost Support Cost No Support Cost Element Selected for CE#1 Subtotal: Support Cost Support - Acceptance Testing Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 11 of 63 P-1 Line #25 Volume 1 - 603 === page 636 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E50601 / CHARGE, Demo Blk Comp C-4 1-1/4 lb, M112 [M023] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Subtotal: Support - Quality Assurance Cost - - 0.017 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 241.032 - - 84.992 - - - - - - - - - - - - (†) indicates the presence of a P-5a LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 12 of 63 P-1 Line #25 Volume 1 - 604 === page 637 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements LOAD, ASSEMBLE, PACK (LAP) COMP C-4 CLASS 3 O O C P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 AMERICAN ORDNANCE LLC (IAAAP) / MIDDLETOWN, IA Option / FFP ROCK ISLAND ARSENAL, IL Jun 2025 Jun 2026 1,945,213 10.93 Y 2025 BAE SYSTEMS ORDNANCE SYSTEMS INC / KINGSPORT, TN Option / FFP ROCK ISLAND ARSENAL, IL May 2025 Aug 2025 2,567,681 23.89 Y LI 2790E55400 - Demolition Munitions, All Types Army Location of PCO Item Number / Title [DODIC]: E50601 / CHARGE, Demo Blk Comp C-4 1-1/4 lb, M112 [M023] UNCLASSIFIED Page 13 of 63 P-1 Line #25 RFP Issue Date Volume 1 - 605 === page 638 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E50703 / DEMO KIT, BANGALORE TORPEDO, M1A3 (2.5 foot) [MP03] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 0.961 1.978 3.185 3.256 - 3.256 - - - - - - 0.961 1.978 3.185 3.256 - 3.256 - - - - - - 0.961 1.978 3.185 3.256 - 3.256 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE ROUND (†) 1,641.03 Subtotal: Recurring Cost Subtotal: Hardware Cost 274 0.450 - - 0.450 - - 0.450 1,738.17 721 1.253 - - 1.253 - - 1.253 1,777.99 1,391 2.473 - - 2.473 - - 2.473 1,814.84 1,218 2.210 - - - - - 2.210 - - - - - 2.210 - - - 1,814.84 1,218 2.210 - - 2.210 - - 2.210 Support - Production Engineering Cost Production Engineering - - 0.511 - - 0.725 - - 0.712 - - 1.046 - - - - - 1.046 Subtotal: Support Production Engineering Cost - - 0.511 - - 0.725 - - 0.712 - - 1.046 - - - - - 1.046 Gross/Weapon System Cost - - 0.961 - - 1.978 - - 3.185 - - 3.256 - - - - - 3.256 Remarks: FY 2026 to FY 2027 funding increase reflects procurement of ammunition needed to meet training and depot level requirements. The unit price increase from FY 2026 to FY 2027 reflects the terms of the current pricing matrix based on the latest independent government cost estimate. (†) indicates the presence of a P-5a LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 14 of 63 P-1 Line #25 Volume 1 - 606 === page 639 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements COMPLETE ROUND COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 TO BE SELECTED / TO BE SELECTED Option / FFP PICATINNY ARSENAL, NJ Mar 2026 Mar 2027 721 1,738.17 Y 2026 TO BE SELECTED / TO BE SELECTED C / FFP PICATINNY ARSENAL, NJ Mar 2026 Mar 2027 1,391 1,777.99 Y 2027 TO BE SELECTED / TO BE SELECTED Option / FFP PICATINNY ARSENAL, NJ Mar 2027 Mar 2028 1,218 1,814.84 Y LI 2790E55400 - Demolition Munitions, All Types Army Location of PCO Item Number / Title [DODIC]: E50703 / DEMO KIT, BANGALORE TORPEDO, M1A3 (2.5 foot) [MP03] UNCLASSIFIED Page 15 of 63 P-1 Line #25 (Each) RFP Issue Date Volume 1 - 607 === page 640 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E50800 / CHARGE, Demo Blk TNT 1/4 lb [M030] MDAP/MAIS Code: Resource Summary Prior Years FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - - Gross/Weapon System Cost ($ in Millions) 6.713 1.879 - - - - Less PY Advance Procurement ($ in Millions) - - - - - - 6.713 1.879 - - - - - - - - - - 6.713 1.879 - - - - Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 47.07 5.610 12.70 Subtotal: Recurring Cost - - 5.610 - - 5.610 - Acceptance Test Subtotal: Support Acceptance Testing Cost - - 0.075 - - Production Engineering - Subtotal: Support Production Engineering Cost - ROUND Subtotal: Hardware Cost 119,184 124,125 1.576 - - - - - - - - - - - - - 1.576 - - - - - - - - - - - - - 1.576 - - - - - - - - - - - - - - 0.024 - - - - - - - - - - - - 0.075 - - 0.024 - - - - - - - - - - - - - 1.015 - - 0.278 - - - - - - - - - - - - - 1.015 - - 0.278 - - - - - - - - - - - - Support - Acceptance Testing Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.013 - - - - - - - - - - - - - - - Subtotal: Support - Quality Assurance Cost - - 0.013 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 6.713 - - 1.879 - - - - - - - - - - - - (†) indicates the presence of a P-5a LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 16 of 63 P-1 Line #25 Volume 1 - 608 === page 641 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements COMPLETE ROUND O O C P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types FY Contractor and Location 2025 ACCURATE ENERGETIC SYSTEMS, LLC / MC EWEN, TN LI 2790E55400 - Demolition Munitions, All Types Army Method/Type or Funding Vehicle C / IDIQ Location of PCO ROCK ISLAND ARSENAL, IL UNCLASSIFIED Page 17 of 63 Item Number / Title [DODIC]: E50800 / CHARGE, Demo Blk TNT 1/4 lb [M030] Award Date Date of First Delivery (Each) May 2025 May 2026 124,125 P-1 Line #25 Qty Specs Date Unit Cost Avail Revision Now? Available ($) 12.70 RFP Issue Date Y Volume 1 - 609 === page 642 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E50804 / TRAINER, SELECTABLE LTWT ATTK MUNIT(SLAM), M320A1 [MZ40] MDAP/MAIS Code: Resource Summary Prior Years FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - - Gross/Weapon System Cost ($ in Millions) 4.219 4.914 - - - - Less PY Advance Procurement ($ in Millions) - - - - - - 4.219 4.914 - - - - - - - - - - 4.219 4.914 - - - - Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE ROUND - - 4.219 25 1.322 - - - - - - - - - - - - Subtotal: Recurring Cost - - 4.219 - - 1.322 - - - - - - - - - - - - - - 4.219 - - 1.322 - - - - - - - - - - - - Subtotal: Hardware Cost 52,892.00 Support - Acceptance Testing Cost Acceptance Test - - - - - 3.592 - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - - - - 3.592 - - - - - - - - - - - - Gross/Weapon System Cost - - 4.219 - - 4.914 - - - - - - - - - - - - LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 18 of 63 P-1 Line #25 Volume 1 - 610 === page 643 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E51000 / CHARGE, Demo Blk TNT 1 lb MDAP/MAIS Code: Resource Summary Prior Years FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - - Gross/Weapon System Cost ($ in Millions) 7.261 4.938 - - - - Less PY Advance Procurement ($ in Millions) - - - - - - 7.261 4.938 - - - - - - - - - - 7.261 4.938 - - - - Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost TNT TYPE I FLAKE (TRINITROTOLUENE) LOAD, ASSEMBLE, 6.28 271,851 1.706 - 13.99 261,505 - - - - - - - - - - - - - 3.658 27.87 3.617 - - - - - - - - - - - - - - 5.365 - - 3.617 - - - - - - - - - - - - - - 5.365 - - 3.617 - - - - - - - - - - - - Acceptance Test - - - - - 0.023 - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - - - - 0.023 - - - - - - - - - - - - (†) PACK (LAP) Subtotal: Recurring Cost Subtotal: Hardware Cost 129,781 - Support - Acceptance Testing Cost Support - Production Engineering Cost Production Engineering - - 1.896 - - 1.298 - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - 1.896 - - 1.298 - - - - - - - - - - - - Gross/Weapon System Cost - - 7.261 - - 4.938 - - - - - - - - - - - - (†) indicates the presence of a P-5a LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 19 of 63 P-1 Line #25 Volume 1 - 611 === page 644 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements LOAD, ASSEMBLE, PACK (LAP) O O C P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types FY Contractor and Location 2025 ACCURATE ENERGETIC SYSTEMS, LLC / MC EWEN, TN LI 2790E55400 - Demolition Munitions, All Types Army Method/Type or Funding Vehicle C / IDIQ Location of PCO ROCK ISLAND ARSENAL, IL UNCLASSIFIED Page 20 of 63 Item Number / Title [DODIC]: E51000 / CHARGE, Demo Blk TNT 1 lb Award Date Date of First Delivery (Each) May 2025 May 2026 129,781 P-1 Line #25 Qty Specs Date Unit Cost Avail Revision Now? Available ($) 27.87 RFP Issue Date Y Volume 1 - 612 === page 645 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E51300 / CHARGE, Demo Cratering 40 lb [M039] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 64.694 5.479 2.765 4.506 - 4.506 - - - - - - 64.694 5.479 2.765 4.506 - 4.506 - - - - - - 64.694 5.479 2.765 4.506 - 4.506 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, (†) PACK (LAP) COMP B TYPE I GRADE A (†) 1,375.40 16,476 22.661 1,024.79 2,801 2.870 640.06 1,556 0.996 1,346.89 1,747 2.353 - - - 1,346.89 1,747 2.353 43.32 600,321 26.003 14.12 67,889 0.959 13.79 56,669 0.781 14.05 63,625 0.894 - - - 14.05 63,625 0.894 ALUMINUM POWDER - - - - - - 6.50 16,446 0.107 6.63 18,465 0.122 - - - 6.63 18,465 0.122 274.38 41,637 11.424 16.89 4,711 0.080 26.52 3,930 0.104 27.07 4,412 0.119 - - - 27.07 4,412 0.119 - - 60.088 - - 3.909 - - 1.989 - - 3.489 - - - - - 3.489 - - 60.088 - - 3.909 - - 1.989 - - 3.489 - - - - - 3.489 Production Engineering - - 4.594 - - 1.565 - - 0.765 - - 1.010 - - - - - 1.010 Subtotal: Support Production Engineering Cost - - 4.594 - - 1.565 - - 0.765 - - 1.010 - - - - - 1.010 FLAKED (†) COMP D-2 (†) Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.012 - - 0.005 - - 0.011 - - 0.007 - - - - - 0.007 Subtotal: Support - Quality Assurance Cost - - 0.012 - - 0.005 - - 0.011 - - 0.007 - - - - - 0.007 Gross/Weapon System Cost - - 64.694 - - 5.479 - - 2.765 - - 4.506 - - - - - 4.506 LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 21 of 63 P-1 Line #25 Volume 1 - 613 === page 646 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E51300 / CHARGE, Demo Cratering 40 lb [M039] MDAP/MAIS Code: Remarks: FY 2026 to FY 2027 funding increase reflects procurement of ammunition needed to meet training and depot level requirements. The unit price increase from FY 2026 to FY 2027 reflects the terms of the current contract pricing matrix negotiated with the vendor. (†) indicates the presence of a P-5a LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 22 of 63 P-1 Line #25 Volume 1 - 614 === page 647 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) COMP B TYPE I GRADE A COMP B TYPE I GRADE A COMP B TYPE I GRADE A COMP B TYPE I GRADE A ALUMINUM POWDER FLAKED ALUMINUM POWDER FLAKED COMP D-2 COMP D-2 COMP D-2 COMP D-2 O O C P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 AMERICAN ORDNANCE LLC (IAAAP) / MIDDLETOWN, IA C / IDIQ ROCK ISLAND ARSENAL, IL May 2025 Nov 2026 2,801 1,024.79 Y 2026 AMERICAN ORDNANCE LLC (IAAAP) / MIDDLETOWN, IA Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Jun 2027 1,556 640.06 Y 2027 AMERICAN ORDNANCE LLC (IAAAP) / MIDDLETOWN, IA Option / FFP ROCK ISLAND ARSENAL, IL May 2027 Nov 2028 1,747 1,346.89 Y 2025 BAE SYSTEMS ORDNANCE SYSTEMS INC / KINGSPORT, TN Option / IDIQ ROCK ISLAND ARSENAL, IL Mar 2025 Mar 2026 45,926 15.29 Y 2025 BAE SYSTEMS ORDNANCE SYSTEMS INC / KINGSPORT, TN Option / FFP ROCK ISLAND ARSENAL, IL Aug 2025 Aug 2026 21,963 15.10 Y 2026 BAE SYSTEMS ORDNANCE SYSTEMS INC / KINGSPORT, TN Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 56,669 13.79 Y 2027 BAE SYSTEMS ORDNANCE SYSTEMS INC / KINGSPORT, TN Option / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 63,625 14.05 Y 2026 TO BE SELECTED / TO BE SELECTED C / TBD ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 16,446 6.50 Y 2027 TO BE SELECTED / TO BE SELECTED C / TBD ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 18,465 6.63 Y 2025 BAE SYSTEMS ORDNANCE SYSTEMS INC / KINGSPORT, TN C / FFP ROCK ISLAND ARSENAL, IL Mar 2025 Mar 2026 3,186 16.42 Y 2025 BAE SYSTEMS ORDNANCE SYSTEMS INC / KINGSPORT, TN C / FFP ROCK ISLAND ARSENAL, IL Aug 2025 Aug 2026 1,525 16.89 Y 2026 BAE SYSTEMS ORDNANCE SYSTEMS INC / KINGSPORT, TN Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 3,930 26.52 Y 2027 BAE SYSTEMS ORDNANCE SYSTEMS INC / KINGSPORT, TN Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Jun 2027 4,412 27.07 Y LI 2790E55400 - Demolition Munitions, All Types Army Location of PCO Item Number / Title [DODIC]: E51300 / CHARGE, Demo Cratering 40 lb [M039] UNCLASSIFIED Page 23 of 63 P-1 Line #25 (Each) RFP Issue Date Volume 1 - 615 === page 648 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E51400 / CHARGE, Demo, (50ft), Sheet Explosive, M186 [M060] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 24.357 0.064 0.063 0.063 - 0.063 - - - - - - 24.357 0.064 0.063 0.063 - 0.063 - - - - - - 24.357 0.064 0.063 0.063 - 0.063 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Complete Round 55.21 19.800 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 19.800 - - - - - - - - - - - - - - - - - 19.800 - - - - - - - - - - - - - - - First Article Test - - 0.448 - - - - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 0.448 - - - - - - - - - - - - - - - Production Engineering - - 4.089 - - 0.060 - - 0.063 - - 0.063 - - - - - 0.063 Subtotal: Support Production Engineering Cost - - 4.089 - - 0.060 - - 0.063 - - 0.063 - - - - - 0.063 Subtotal: Hardware Cost 358,615 Support - Acceptance Testing Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.020 - - 0.004 - - - - - - - - - - - - Subtotal: Support - Quality Assurance Cost - - 0.020 - - 0.004 - - - - - - - - - - - - Gross/Weapon System Cost - - 24.357 - - 0.064 - - 0.063 - - 0.063 - - - - - 0.063 LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 24 of 63 P-1 Line #25 Volume 1 - 616 === page 649 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E52000 / MUNITION, Selectable Lightweight Attack (SLAM), M4 [MP12] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - 28.779 - - - - - - - - - 28.779 - - - - - - - - - 28.779 - - - - - Gross/Weapon System Cost ($ in Millions) 105.313 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 105.313 Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) 105.313 FY 2026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost (†) 13,969 91.017 5,216 21.625 - - - - - - - - - - - - - - 91.017 - - 21.625 - - - - - - - - - - - - - - 91.017 - - 21.625 - - - - - - - - - - - - Acceptance Test - - 0.893 - - - - - - - - - - - - - - - First Article Test - - 2.506 - - 4.311 - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 3.399 - - 4.311 - - - - - - - - - - - - Production Qualification Test - - 0.300 - - - - - - - - - - - - - - - Subtotal: Support - Product Improvement Cost - - 0.300 - - - - - - - - - - - - - - - Complete Round 6,515.64 Subtotal: Recurring Cost Subtotal: Hardware Cost 4,145.98 Support - Acceptance Testing Cost Support - Product Improvement Cost Support - Production Engineering Cost Production Engineering - - 10.597 - - 2.843 - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - 10.597 - - 2.843 - - - - - - - - - - - - Gross/Weapon System Cost - - 105.313 - - 28.779 - - - - - - - - - - - - LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 25 of 63 P-1 Line #25 Volume 1 - 617 === page 650 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types ID Code (A=Service Ready, B=Not Service Ready) : A (†) Item Number / Title [DODIC]: E52000 / MUNITION, Selectable Lightweight Attack (SLAM), M4 [MP12] MDAP/MAIS Code: indicates the presence of a P-5a LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 26 of 63 P-1 Line #25 Volume 1 - 618 === page 651 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements Complete Round O O C P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types FY Contractor and Location 2025 NORTHROP GRUMMAN SYSTEMS CORP / PLYMOUTH, MN LI 2790E55400 - Demolition Munitions, All Types Army Method/Type or Funding Vehicle Option / IDIQ Item Number / Title [DODIC]: E52000 / MUNITION, Selectable Lightweight Attack (SLAM), M4 [MP12] Location of PCO Award Date Date of First Delivery Picatinny Arsenal Mar 2025 Mar 2026 UNCLASSIFIED Page 27 of 63 P-1 Line #25 Qty (Each) 5,216 Specs Date Unit Cost Avail Revision Now? Available ($) 4,145.98 RFP Issue Date N Volume 1 - 619 === page 652 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E52400 / CAP BLASTING NON-ELEC INERT MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 0.717 - 0.391 0.662 - 0.662 - - - - - - 0.717 - 0.391 0.662 - 0.662 - - - - - - 0.717 - 0.391 0.662 - 0.662 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 27.00 10,020 0.271 - - - 20.23 15,364 0.311 19.18 25,247 0.484 - - - 19.18 25,247 0.484 Subtotal: Recurring Cost - - 0.271 - - - - - 0.311 - - 0.484 - - - - - 0.484 - - 0.271 - - - - - 0.311 - - 0.484 - - - - - 0.484 Production Engineering - - 0.441 - - - - - 0.075 - - 0.173 - - - - - 0.173 Subtotal: Support Production Engineering Cost - - 0.441 - - - - - 0.075 - - 0.173 - - - - - 0.173 ROUND Subtotal: Hardware Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.005 - - - - - 0.005 - - 0.004 - - - - - 0.004 Subtotal: Support - Quality Assurance Cost - - 0.005 - - - - - 0.005 - - 0.004 - - - - - 0.004 Gross/Weapon System Cost - - 0.717 - - - - - 0.391 - - 0.662 - - - - - 0.662 Remarks: FY 2026 to FY 2027 funding increase reflects procurement of ammunition needed to meet training and depot level requirements. (†) indicates the presence of a P-5a LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 28 of 63 P-1 Line #25 Volume 1 - 620 === page 653 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 R. STRESAU LABORATORY, INC. / SPOONER, WI Option / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Aug 2027 15,364 20.23 Y 2027 R. STRESAU LABORATORY, INC. / SPOONER, WI Option / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Aug 2028 25,247 19.18 Y LI 2790E55400 - Demolition Munitions, All Types Army Location of PCO Item Number / Title [DODIC]: E52400 / CAP BLASTING NON-ELEC INERT UNCLASSIFIED Page 29 of 63 P-1 Line #25 (Each) RFP Issue Date Volume 1 - 621 === page 654 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E52500 / CAP, Blasting Elec, M6 [M130] MDAP/MAIS Code: Resource Summary Prior Years FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - - Gross/Weapon System Cost ($ in Millions) 21.501 1.627 - - - - Less PY Advance Procurement ($ in Millions) - - - - - - 21.501 1.627 - - - - - - - - - - 21.501 1.627 - - - - Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost (†) 19.984 76.22 21,346 1.627 - - - - - - - - - - - - - - 19.984 - - 1.627 - - - - - - - - - - - - - - 19.984 - - 1.627 - - - - - - - - - - - - Production Engineering - - 1.508 - - 0.000 - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - 1.508 - - - - - - - - - - - - - - - Complete Round 27.75 Subtotal: Recurring Cost Subtotal: Hardware Cost 720,250 Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.010 - - - - - - - - - - - - - - - Subtotal: Support - Quality Assurance Cost - - 0.010 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 21.501 - - 1.627 - - - - - - - - - - - - (†) indicates the presence of a P-5a LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 30 of 63 P-1 Line #25 Volume 1 - 622 === page 655 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements Complete Round O O C FY Contractor and Location 2025 R. STRESAU LABORATORY, INC. / SPOONER, WI LI 2790E55400 - Demolition Munitions, All Types Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Method/Type or Funding Vehicle Option / IDIQ Location of PCO ROCK ISLAND ARSENAL, IL UNCLASSIFIED Page 31 of 63 Item Number / Title [DODIC]: E52500 / CAP, Blasting Elec, M6 [M130] Award Date Date of First Delivery Mar 2025 Mar 2026 P-1 Line #25 Qty (Each) 21,346 Specs Date Unit Cost Avail Revision Now? Available ($) 76.22 RFP Issue Date Y Volume 1 - 623 === page 656 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E52600 / CAP BLASTING NON-ELEC M7 MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 11.653 0.978 0.588 0.923 - 0.923 - - - - - - 11.653 0.978 0.588 0.923 - 0.923 - - - - - - 11.653 0.978 0.588 0.923 - 0.923 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 25.13 Subtotal: Recurring Cost - Production Engineering Subtotal: Support Production Engineering Cost ROUND Subtotal: Hardware Cost 418,772 10.523 32.06 19,800 0.635 34.30 13,838 0.475 36.02 18,821 0.678 - - - 36.02 18,821 0.678 - 10.523 - - 0.635 - - 0.475 - - 0.678 - - - - - 0.678 - 10.523 - - 0.635 - - 0.475 - - 0.678 - - - - - 0.678 - - 1.130 - - 0.343 - - 0.113 - - 0.242 - - - - - 0.242 - - 1.130 - - 0.343 - - 0.113 - - 0.242 - - - - - 0.242 Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - - - - - - - - - - 0.003 - - - - - 0.003 Subtotal: Support - Quality Assurance Cost - - - - - - - - - - - 0.003 - - - - - 0.003 Gross/Weapon System Cost - - 11.653 - - 0.978 - - 0.588 - - 0.923 - - - - - 0.923 Remarks: FY 2026 to FY 2027 funding increase reflects procurement of ammunition needed to meet training and depot level requirements. (†) indicates the presence of a P-5a LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 32 of 63 P-1 Line #25 Volume 1 - 624 === page 657 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements COMPLETE ROUND COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 R. STRESAU LABORATORY, INC. / SPOONER, WI Option / IDIQ ROCK ISLAND ARSENAL, IL Jun 2025 Apr 2027 19,800 32.06 Y 2026 R. STRESAU LABORATORY, INC. / SPOONER, WI Option / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Mar 2027 13,838 34.30 Y 2027 R. STRESAU LABORATORY, INC. / SPOONER, WI Option / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 18,821 36.02 Y LI 2790E55400 - Demolition Munitions, All Types Army Location of PCO Item Number / Title [DODIC]: E52600 / CAP BLASTING NON-ELEC M7 UNCLASSIFIED Page 33 of 63 P-1 Line #25 (Each) RFP Issue Date Volume 1 - 625 === page 658 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E53100 / CHARGE, Demo Shaped 15 lb, M2 MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 27.265 - 1.438 6.580 - 6.580 - - - - - - 27.265 - 1.438 6.580 - 6.580 - - - - - - 27.265 - 1.438 6.580 - 6.580 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, 9,865 23.676 - - - 709.66 1,208 0.857 1,247.40 3,688 4.600 - - - 1,247.40 3,688 4.600 - - - - - - 3.58 181 0.001 3.64 553 0.002 - - - 3.64 553 0.002 - - - - - - 13.79 15,704 0.217 14.05 47,944 0.674 - - - 14.05 47,944 0.674 - - 23.676 - - - - - 1.074 - - 5.276 - - - - - 5.276 - - 23.676 - - - - - 1.074 - - 5.276 - - - - - 5.276 Acceptance Test - - - - - - - - - - - 0.351 - - - - - 0.351 Subtotal: Support Acceptance Testing Cost - - - - - - - - - - - 0.351 - - - - - 0.351 (†) PACK (LAP) 2,400.00 (†) COMP A-3 COMP B TYPE I GRADE A (†) Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Production Engineering Cost Production Engineering - - 3.589 - - - - - 0.363 - - 0.953 - - - - - 0.953 Subtotal: Support Production Engineering Cost - - 3.589 - - - - - 0.363 - - 0.953 - - - - - 0.953 Gross/Weapon System Cost - - 27.265 - - - - - 1.438 - - 6.580 - - - - - 6.580 Remarks: FY 2026 to FY 2027 funding increase reflects procurement of ammunition needed to meet training and depot level requirements. LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 34 of 63 P-1 Line #25 Volume 1 - 626 === page 659 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E53100 / CHARGE, Demo Shaped 15 lb, M2 MDAP/MAIS Code: The unit price increase from FY 2026 to FY 2027 reflects the terms of the current pricing matrix based on the latest independent government cost estimate. (†) indicates the presence of a P-5a LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 35 of 63 P-1 Line #25 Volume 1 - 627 === page 660 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) COMP A-3 COMP A-3 COMP B TYPE I GRADE A COMP B TYPE I GRADE A O O C P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 TO BE SELECTED / TO BE SELECTED Option / IDIQ ROCK ISLAND ARSENAL, IL Jun 2026 Jun 2027 1,208 709.66 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Jun 2027 Jun 2028 3,688 1,247.40 Y 2026 TO BE SELECTED / TO BE SELECTED TBD ROCK ISLAND ARSENAL, IL Mar 2026 Jun 2026 181 3.58 Y 2027 TO BE SELECTED / TO BE SELECTED Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Jun 2027 553 3.64 Y 2026 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL Jun 2026 Jun 2027 15,704 13.79 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL May 2027 May 2028 47,944 14.05 Y LI 2790E55400 - Demolition Munitions, All Types Army Location of PCO Item Number / Title [DODIC]: E53100 / CHARGE, Demo Shaped 15 lb, M2 UNCLASSIFIED Page 36 of 63 P-1 Line #25 (Each) RFP Issue Date Volume 1 - 628 === page 661 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E53200 / CHARGE, Demo Shaped 40 lb, M3 MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 31.400 0.800 2.280 1.939 - 1.939 - - - - - - 31.400 0.800 2.280 1.939 - 1.939 - - - - - - 31.400 0.800 2.280 1.939 - 1.939 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, 17,105.28 1,774 30.345 - - - 1,206.86 1,034 1.248 1,589.76 662 1.052 - - - 1,589.76 662 1.052 13.33 56,768 0.757 - - - 13.79 33,088 0.456 14.05 21,184 0.298 - - - 14.05 21,184 0.298 3.23 200 0.001 - - - - - - 2.57 75 *.*** - - - 2.57 75 *.*** - - - - - - 2.57 117 *.*** - - - - - - - - - - - 31.102 - - - - - 1.704 - - 1.350 - - - - - 1.350 - - 31.102 - - - - - 1.704 - - 1.350 - - - - - 1.350 Acceptance Test - - - - - - - - - - - 0.307 - - - - - 0.307 Subtotal: Support Acceptance Testing Cost - - - - - - - - - - - 0.307 - - - - - 0.307 - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - 0.295 - - 0.800 - - 0.576 - - 0.282 - - - - - 0.282 (†) PACK (LAP) COMP B TYPE I GRADE A (†) COMP A-3 (†) *COMP A-3 Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Government Furnished Materials Cost Government Furnished Materials Subtotal: Support Government Furnished Materials Cost Support - Production Engineering Cost Production Engineering LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 37 of 63 P-1 Line #25 Volume 1 - 629 === page 662 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E53200 / CHARGE, Demo Shaped 40 lb, M3 MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Subtotal: Support Production Engineering Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 0.295 - - 0.800 - - 0.576 - - 0.282 - - - - - 0.282 Support - Quality Assurance Cost Quality Assurance - - 0.002 - - - - - - - - - - - - - - - Subtotal: Support - Quality Assurance Cost - - 0.002 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 31.400 - - 0.800 - - 2.280 - - 1.939 - - - - - 1.939 Remarks: The unit price increase from FY 2026 to FY 2027 reflects the terms of the current pricing matrix based on the latest independent government cost estimate. *.*** represents funding below $1,000.00 (†) indicates the presence of a P-5a LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 38 of 63 P-1 Line #25 Volume 1 - 630 === page 663 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) COMP B TYPE I GRADE A COMP B TYPE I GRADE A *COMP A-3 O O C P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 TO BE SELECTED / TO BE SELECTED C / TBD ROCK ISLAND ARSENAL, IL Jun 2026 Jun 2027 1,034 1,206.86 Y 2027 TO BE SELECTED / TO BE SELECTED C / TBD ROCK ISLAND ARSENAL, IL Jun 2027 Jun 2028 662 1,589.76 Y 2026 BAE SYSTEMS ORDNANCE SYSTEMS / KINGSPORT, TN Option / IDIQ ROCK ISLAND ARSENAL, IL May 2026 May 2027 33,088 13.79 Y 2027 TO BE SELECTED / TO BE SELECTED C / IDIQ ROCK ISLAND ARSENAL, IL May 2027 May 2028 21,184 14.05 Y 2026 GOVERNMENT FURNISHED MATERIAL / STOCK ISSUE, GFM ROCK ISLAND ARSENAL, IL Sep 2026 Sep 2026 117 2.57 N LI 2790E55400 - Demolition Munitions, All Types Army Location of PCO Item Number / Title [DODIC]: E53200 / CHARGE, Demo Shaped 40 lb, M3 UNCLASSIFIED Page 39 of 63 P-1 Line #25 (Each) RFP Issue Date Volume 1 - 631 === page 664 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E54100 / CORD, Detonating Type 1 [M456] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 47.728 2.592 2.570 2.635 - 2.635 - - - - - - 47.728 2.592 2.570 2.635 - 2.635 - - - - - - 47.728 2.592 2.570 2.635 - 2.635 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost (†) 44.241 0.50 2.204 0.44 2.172 0.46 2.173 - - - 0.46 - - 44.237 - - 2.204 - - 2.172 - - 2.173 - - - - - 2.173 - - 44.237 - - 2.204 - - 2.172 - - 2.173 - - - - - 2.173 First Article Test - - 0.024 - - - - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 0.024 - - - - - - - - - - - - - - - Production Engineering - - 3.514 - - 0.384 - - 0.395 - - 0.456 - - - - - 0.456 Subtotal: Support Production Engineering Cost - - 3.514 - - 0.384 - - 0.395 - - 0.456 - - - - - 0.456 Complete Round Subtotal: Recurring Cost Subtotal: Hardware Cost 0.34 128,971K 4,407,819 4,936,630 4,724,700 4,724,700 2.173 Support - Acceptance Testing Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.021 - - 0.004 - - 0.003 - - 0.006 - - - - - 0.006 Subtotal: Support - Quality Assurance Cost - - 0.021 - - 0.004 - - 0.003 - - 0.006 - - - - - 0.006 Gross/Weapon System Cost - - 47.728 - - 2.592 - - 2.570 - - 2.635 - - - - - 2.635 Remarks: FY 2026 to FY 2027 funding increase reflects procurement of ammunition needed to meet training and depot level requirements. LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 40 of 63 P-1 Line #25 Volume 1 - 632 === page 665 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types ID Code (A=Service Ready, B=Not Service Ready) : A (†) Item Number / Title [DODIC]: E54100 / CORD, Detonating Type 1 [M456] MDAP/MAIS Code: indicates the presence of a P-5a LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 41 of 63 P-1 Line #25 Volume 1 - 633 === page 666 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements Complete Round Complete Round Complete Round O O C P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 ENSIGN-BICKFORD AEROSPACE & DEFENSE / SIMSBURY, CT Option / FFP ROCK ISLAND ARSENAL, IL Jun 2025 Mar 2026 4,407,819 0.50 Y 2026 ENSIGN-BICKFORD AEROSPACE & DEFENSE / SIMSBURY, CT Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Oct 2026 4,936,630 0.44 Y 2027 ENSIGN-BICKFORD AEROSPACE & DEFENSE / SIMSBURY, CT Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Dec 2027 4,724,700 0.46 Y LI 2790E55400 - Demolition Munitions, All Types Army Location of PCO Item Number / Title [DODIC]: E54100 / CORD, Detonating Type 1 [M456] UNCLASSIFIED Page 42 of 63 P-1 Line #25 RFP Issue Date Volume 1 - 634 === page 667 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E54200 / CORD DETONATING INERT MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 1.672 0.206 0.105 0.244 - 0.244 - - - - - - 1.672 0.206 0.105 0.244 - 0.244 - - - - - - 1.672 0.206 0.105 0.244 - 0.244 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 0.93 Subtotal: Recurring Cost - ROUND Subtotal: Hardware Cost 609,899 0.570 0.48 - 0.570 - - 0.570 - 372,000 0.179 0.62 - 0.179 - - 0.179 - 143,345 0.089 0.53 - 0.089 - - 0.089 - 380,652 0.202 - - - 0.53 380,652 0.202 - 0.202 - - - - - 0.202 - 0.202 - - - - - 0.202 Support - Production Engineering Cost Production Engineering - - 1.102 - - 0.027 - - 0.016 - - 0.042 - - - - - 0.042 Subtotal: Support Production Engineering Cost - - 1.102 - - 0.027 - - 0.016 - - 0.042 - - - - - 0.042 Gross/Weapon System Cost - - 1.672 - - 0.206 - - 0.105 - - 0.244 - - - - - 0.244 Remarks: FY 2026 to FY 2027 funding increase reflects procurement of ammunition needed to meet training and depot level requirements. (†) indicates the presence of a P-5a LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 43 of 63 P-1 Line #25 Volume 1 - 635 === page 668 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements COMPLETE ROUND COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 ENSIGN-BICKFORD AEROSPACE & DEFENSE / SIMSBURY, CT Option / FFP PICATINNY ARSENAL, NJ Jun 2025 Jun 2026 372,000 0.48 Y 2026 ENSIGN-BICKFORD AEROSPACE & DEFENSE / SIMSBURY, CT Option / FFP PICATINNY ARSENAL, NJ Mar 2026 Dec 2026 143,345 0.62 Y 2027 ENSIGN-BICKFORD AEROSPACE & DEFENSE / SIMSBURY, CT Option / FFP PICATINNY ARSENAL, NJ Mar 2027 Mar 2028 380,652 0.53 Y LI 2790E55400 - Demolition Munitions, All Types Army Location of PCO Item Number / Title [DODIC]: E54200 / CORD DETONATING INERT UNCLASSIFIED Page 44 of 63 P-1 Line #25 RFP Issue Date Volume 1 - 636 === page 669 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E60200 / CUTTER, Cartridge Actuated, M21, 2 Second Delay [M500] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 62.130 - 0.077 0.182 - 0.182 - - - - - - 62.130 - 0.077 0.182 - 0.182 - - - - - - 62.130 - 0.077 0.182 - 0.182 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Complete Round (†) 1,770.09 Subtotal: Recurring Cost Subtotal: Hardware Cost 34,279 60.677 - - - 702.44 101 0.071 771.20 215 0.166 - - - 771.20 215 0.166 - - 60.677 - - - - - 0.071 - - 0.166 - - - - - 0.166 - - 60.677 - - - - - 0.071 - - 0.166 - - - - - 0.166 Support - Production Engineering Cost Production Engineering - - 1.453 - - - - - 0.006 - - 0.016 - - - - - 0.016 Subtotal: Support Production Engineering Cost - - 1.453 - - - - - 0.006 - - 0.016 - - - - - 0.016 Gross/Weapon System Cost - - 62.130 - - - - - 0.077 - - 0.182 - - - - - 0.182 Remarks: FY 2026 to FY 2027 funding increase reflects procurement of ammunition needed to meet training and depot level requirements. Unit cost varies annually based on projected pricing provided by Indian Head Naval Service Warfare Center. (†) indicates the presence of a P-5a LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 45 of 63 P-1 Line #25 Volume 1 - 637 === page 670 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements Complete Round Complete Round O O C P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 NAVAL SURF WARFARE CNTR INDIAN HEAD / LEONARDTOWN, MD Option / IDIQ ROCK ISLAND ARSENAL, IL Mar 2026 Jun 2027 101 702.44 Y 2027 NAVAL SURF WARFARE CNTR INDIAN HEAD / LEONARDTOWN, MD PO OTHER Mar 2027 Mar 2028 215 771.20 Y LI 2790E55400 - Demolition Munitions, All Types Army Location of PCO Item Number / Title [DODIC]: E60200 / CUTTER, Cartridge Actuated, M21, 2 Second Delay [M500] UNCLASSIFIED Page 46 of 63 P-1 Line #25 (Each) RFP Issue Date Volume 1 - 638 === page 671 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E78201 / CHARGE, Demo (38FT) Sheet Explosive, PBXW-202 [M980] MDAP/MAIS Code: Resource Summary Prior Years FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - - Gross/Weapon System Cost ($ in Millions) 12.199 1.221 - - - - Less PY Advance Procurement ($ in Millions) - - - - - - 12.199 1.221 - - - - - - - - - - 12.199 1.221 - - - - Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 35.32 Subtotal: Recurring Cost - Production Engineering Subtotal: Support Production Engineering Cost ROUND Subtotal: Hardware Cost 334,010 11.797 23.42 47,352 1.109 - - - - - - - - - - - - - 11.797 - - 1.109 - - - - - - - - - - - - - 11.797 - - 1.109 - - - - - - - - - - - - - - 0.394 - - 0.112 - - - - - - - - - - - - - - 0.394 - - 0.112 - - - - - - - - - - - - Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.008 - - - - - - - - - - - - - - - Subtotal: Support - Quality Assurance Cost - - 0.008 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 12.199 - - 1.221 - - - - - - - - - - - - (†) indicates the presence of a P-5a LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 47 of 63 P-1 Line #25 Volume 1 - 639 === page 672 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements COMPLETE ROUND O O C P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types FY Contractor and Location 2025 ENSIGN-BICKFORD AEROSPACE & DEFENSE / SIMSBURY, CT LI 2790E55400 - Demolition Munitions, All Types Army Method/Type or Funding Vehicle Option / FFP Location of PCO ROCK ISLAND ARSENAL, IL UNCLASSIFIED Page 48 of 63 Item Number / Title [DODIC]: E78201 / CHARGE, Demo (38FT) Sheet Explosive, PBXW-202 [M980] Award Date Date of First Delivery Mar 2025 Dec 2026 P-1 Line #25 Qty (Each) 47,352 Specs Date Unit Cost Avail Revision Now? Available ($) 23.42 RFP Issue Date Y Volume 1 - 640 === page 673 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E81302 / CAP, Blasting Non-Elec, w/30Ft Shock Tube [ML47] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 12.841 0.222 1.640 0.081 - 0.081 - - - - - - 12.841 0.222 1.640 0.081 - 0.081 - - - - - - 12.841 0.222 1.640 0.081 - 0.081 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Complete Round (†) 23.78 Subtotal: Recurring Cost Subtotal: Hardware Cost 11.820 26.65 7,320 0.195 26.13 32,910 0.860 - - - - - - - - - - 497,142 - 11.820 - - 0.195 - - 0.860 - - - - - - - - - - - 11.820 - - 0.195 - - 0.860 - - - - - - - - - Support - Production Engineering Cost Production Engineering - - 1.021 - - 0.027 - - 0.780 - - 0.081 - - - - - 0.081 Subtotal: Support Production Engineering Cost - - 1.021 - - 0.027 - - 0.780 - - 0.081 - - - - - 0.081 Gross/Weapon System Cost - - 12.841 - - 0.222 - - 1.640 - - 0.081 - - - - - 0.081 (†) indicates the presence of a P-5a LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 49 of 63 P-1 Line #25 Volume 1 - 641 === page 674 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements Complete Round Complete Round O O C P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 ENSIGN-BICKFORD AEROSPACE & DEFENSE / SIMSBURY, CT Option / FFP PICATINNY ARSENAL, NJ Apr 2025 Apr 2026 7,320 26.65 N 2026 ENSIGN-BICKFORD AEROSPACE & DEFENSE / SIMSBURY, CT Option / FFP PICATINNY ARSENAL, NJ May 2026 Aug 2027 32,910 26.13 Y LI 2790E55400 - Demolition Munitions, All Types Army Location of PCO Item Number / Title [DODIC]: E81302 / CAP, Blasting Non-Elec, w/30Ft Shock Tube [ML47] UNCLASSIFIED Page 50 of 63 P-1 Line #25 (Each) RFP Issue Date Volume 1 - 642 === page 675 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E81305 / CAP BLASTING NON-ELEC, DELAY, M14 [MN06] MDAP/MAIS Code: Resource Summary Prior Years FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - - Gross/Weapon System Cost ($ in Millions) 15.248 0.975 - - - - Less PY Advance Procurement ($ in Millions) - - - - - - 15.248 0.975 - - - - - - - - - - 15.248 0.975 - - - - Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost (†) 15.166 22.87 32,360 0.740 - - - - - - - - - - - - - - 15.166 - - 0.740 - - - - - - - - - - - - - - 15.166 - - 0.740 - - - - - - - - - - - - First Article Test - - 0.035 - - - - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 0.035 - - - - - - - - - - - - - - - Complete Round 17.04 Subtotal: Recurring Cost Subtotal: Hardware Cost 889,847 Support - Acceptance Testing Cost Support - Production Engineering Cost Production Engineering - - 0.046 - - 0.235 - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - 0.046 - - 0.235 - - - - - - - - - - - - Gross/Weapon System Cost - - 15.248 - - 0.975 - - - - - - - - - - - - (†) indicates the presence of a P-5a LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 51 of 63 P-1 Line #25 Volume 1 - 643 === page 676 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements Complete Round O O C P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types FY Contractor and Location 2025 ENSIGN-BICKFORD AEROSPACE & DEFENSE / SIMSBURY, CT LI 2790E55400 - Demolition Munitions, All Types Army Method/Type or Funding Vehicle Option / FFP Location of PCO PICATINNY ARSENAL, NJ UNCLASSIFIED Page 52 of 63 Item Number / Title [DODIC]: E81305 / CAP BLASTING NON-ELEC, DELAY, M14 [MN06] Award Date Date of First Delivery Apr 2025 Mar 2026 P-1 Line #25 Qty (Each) 32,360 Specs Date Unit Cost Avail Revision Now? Available ($) 22.87 RFP Issue Date Y Volume 1 - 644 === page 677 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E81307 / IGNITER, Time Fuze and Shock Tube, M81 [MN08] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 25.954 0.575 0.494 0.109 - 0.109 - - - - - - 25.954 0.575 0.494 0.109 - 0.109 - - - - - - 25.954 0.575 0.494 0.109 - 0.109 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost (†) 23.086 7.04 49,680 0.350 8.31 31,175 0.259 8.54 3,057 0.026 - - - 8.54 3,057 0.026 - - 23.086 - - 0.350 - - 0.259 - - 0.026 - - - - - 0.026 - - 23.086 - - 0.350 - - 0.259 - - 0.026 - - - - - 0.026 First Article Test - - 0.018 - - - - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 0.018 - - - - - - - - - - - - - - - - - 0.021 - - - - - - - - - - - - - - - - - 0.021 - - - - - - - - - - - - - - - Production Qualification Test - - 0.013 - - - - - - - - - - - - - - - Subtotal: Support - Product Improvement Cost - - 0.013 - - - - - - - - - - - - - - - - - 2.814 - - 0.225 - - 0.235 - - 0.083 - - - - - 0.083 Complete Round 24.01 Subtotal: Recurring Cost Subtotal: Hardware Cost 961,612 Support - Acceptance Testing Cost Support - Initial Spares and Repair Parts Cost Initial Spares and Repair Parts Subtotal: Support - Initial Spares and Repair Parts Cost Support - Product Improvement Cost Support - Production Engineering Cost Production Engineering LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 53 of 63 P-1 Line #25 Volume 1 - 645 === page 678 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E81307 / IGNITER, Time Fuze and Shock Tube, M81 [MN08] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Subtotal: Support Production Engineering Cost - - 2.814 - - 0.225 - - 0.235 - - 0.083 - - - - - 0.083 Gross/Weapon System Cost - - 25.954 - - 0.575 - - 0.494 - - 0.109 - - - - - 0.109 (†) indicates the presence of a P-5a LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 54 of 63 P-1 Line #25 Volume 1 - 646 === page 679 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements Complete Round Complete Round Complete Round O O C P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Item Number / Title [DODIC]: E81307 / IGNITER, Time Fuze and Shock Tube, M81 [MN08] FY Contractor and Location Method/Type or Funding Vehicle 2025 UDC USA, INC. / TAMPA, FL Option / FFP PICATINNY ARSENAL, NJ Jun 2025 Jun 2026 49,680 7.04 N 2026 UDC USA, INC. / TAMPA, FL Option / FFP PICATINNY ARSENAL, NJ Mar 2026 Mar 2027 31,175 8.31 Y 2027 UDC USA, INC. / TAMPA, FL Option / FFP PICATINNY ARSENAL, NJ Mar 2027 Mar 2028 3,057 8.54 Y LI 2790E55400 - Demolition Munitions, All Types Army Location of PCO UNCLASSIFIED Page 55 of 63 Award Date Date of First Delivery P-1 Line #25 Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date Volume 1 - 647 === page 680 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E83411 / SCENT KIT, CANINE: EXPLOSIVE (CESK) MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - 0.450 0.384 - 0.384 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - 0.450 0.384 - 0.384 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - 0.450 0.384 - 0.384 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) - - - - - - Subtotal: Recurring Cost - - - - - - - - - - - - Acceptance Test - - - - - Subtotal: Support Acceptance Testing Cost - - - - Production Engineering - - - Subtotal: Support Production Engineering Cost - - - ROUND Subtotal: Hardware Cost 2,552.50 78 0.199 - - 0.199 - - 0.199 - - - - - - - - - - - - 2,605.13 134 0.349 - - - - - 0.349 - - - - - 0.349 - - - 0.085 - - - - - - 0.085 - - - - - - 0.034 - - 0.035 - - 0.034 - - 0.035 2,605.13 134 0.349 - - 0.349 - - 0.349 - - - - - - - - - - - - - - 0.035 - - - - - 0.035 Support - Acceptance Testing Cost Support - Production Engineering Cost Support - Recapitalization Cost Recapitalization - - - - - - - - 0.132 - - - - - - - - - Subtotal: Support Recapitalization Cost - - - - - - - - 0.132 - - - - - - - - - Gross/Weapon System Cost - - - - - - - - 0.450 - - 0.384 - - - - - 0.384 (†) indicates the presence of a P-5a LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 56 of 63 P-1 Line #25 Volume 1 - 648 === page 681 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($) Qty FY Contractor and Location 2026 TO BE SELECTED / TO BE SELECTED TBD ROCK ISLAND ARSENAL, IL May 2026 Nov 2027 78 2,552.50 Y 2027 TO BE SELECTED / TO BE SELECTED TBD ROCK ISLAND ARSENAL, IL Mar 2027 Sep 2028 134 2,605.13 Y LI 2790E55400 - Demolition Munitions, All Types Army Location of PCO Item Number / Title [DODIC]: E83411 / SCENT KIT, CANINE: EXPLOSIVE (CESK) UNCLASSIFIED Page 57 of 63 P-1 Line #25 (Each) RFP Issue Date Volume 1 - 649 === page 682 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E99901 / Cap, Blasting, Non-Electric, 200 Ft Minitube, M19 MDAP/MAIS Code: Resource Summary Prior Years FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - - Gross/Weapon System Cost ($ in Millions) 8.569 0.266 - - - - Less PY Advance Procurement ($ in Millions) - - - - - - 8.569 0.266 - - - - - - - - - - 8.569 0.266 - - - - Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 89.48 81,416 7.285 92.62 1,880 0.174 - - - - - - - - - - - - Subtotal: Recurring Cost - - 7.285 - - 0.174 - - - - - - - - - - - - - - 7.285 - - 0.174 - - - - - - - - - - - - ROUND Subtotal: Hardware Cost Support - Production Engineering Cost Production Engineering - - 1.284 - - 0.092 - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - 1.284 - - 0.092 - - - - - - - - - - - - Gross/Weapon System Cost - - 8.569 - - 0.266 - - - - - - - - - - - - (†) indicates the presence of a P-5a LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 58 of 63 P-1 Line #25 Volume 1 - 650 === page 683 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements COMPLETE ROUND O O C P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types FY Contractor and Location 2025 ENSIGN-BICKFORD AEROSPACE & DEFENSE / SIMSBURY, CT LI 2790E55400 - Demolition Munitions, All Types Army Method/Type or Funding Vehicle C / FFP Location of PCO PICATINNY ARSENAL, NJ UNCLASSIFIED Page 59 of 63 Item Number / Title [DODIC]: E99901 / Cap, Blasting, Non-Electric, 200 Ft Minitube, M19 Award Date Date of First Delivery Apr 2025 Dec 2025 P-1 Line #25 Qty (Each) 1,880 Specs Date Unit Cost Avail Revision Now? Available ($) 92.62 RFP Issue Date N Volume 1 - 651 === page 684 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E99903 / CAP, Blasting Non-Elec, w/500Ft Minitube, M21 [MN88] MDAP/MAIS Code: Resource Summary Prior Years FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - - Gross/Weapon System Cost ($ in Millions) 33.894 3.922 - - - - Less PY Advance Procurement ($ in Millions) - - - - - - 33.894 3.922 - - - - - - - - - - 33.894 3.922 - - - - Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost (†) 28.629 60.37 50,776 3.065 - - - - - - - - - - - - - - 28.629 - - 3.065 - - - - - - - - - - - - - - 28.629 - - 3.065 - - - - - - - - - - - - First Article Test - - 0.100 - - - - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 0.100 - - - - - - - - - - - - - - - Complete Round 112.04 Subtotal: Recurring Cost Subtotal: Hardware Cost 255,516 Support - Acceptance Testing Cost Support - Production Engineering Cost Production Engineering - - 5.166 - - 0.857 - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - 5.166 - - 0.857 - - - - - - - - - - - - Gross/Weapon System Cost - - 33.894 - - 3.922 - - - - - - - - - - - - (†) indicates the presence of a P-5a LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 60 of 63 P-1 Line #25 Volume 1 - 652 === page 685 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements Complete Round O O C P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types FY Contractor and Location 2025 ENSIGN-BICKFORD AEROSPACE & DEFENSE / SIMSBURY, CT LI 2790E55400 - Demolition Munitions, All Types Army Method/Type or Funding Vehicle Option / FFP Location of PCO PICATINNY ARSENAL, NJ UNCLASSIFIED Page 61 of 63 Item Number / Title [DODIC]: E99903 / CAP, Blasting Non-Elec, w/500Ft Minitube, M21 [MN88] Award Date Date of First Delivery Apr 2025 Feb 2027 P-1 Line #25 Qty (Each) 50,776 Specs Date Unit Cost Avail Revision Now? Available ($) 60.37 RFP Issue Date Y Volume 1 - 653 === page 686 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E99905 / CAP, Blast, Non-Elec, 1000Ft Minitube, M23 [MN90] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 31.994 0.935 - 0.127 - 0.127 - - - - - - 31.994 0.935 - 0.127 - 0.127 - - - - - - 31.994 0.935 - 0.127 - 0.127 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost (†) 28.298 94.77 8,240 0.781 - - - - - - - - - - - - - - 28.298 - - 0.781 - - - - - - - - - - - - - - 28.298 - - 0.781 - - - - - - - - - - - - First Article Test - - 0.100 - - - - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 0.100 - - - - - - - - - - - - - - - Complete Round 231.95 Subtotal: Recurring Cost Subtotal: Hardware Cost 122,001 Support - Acceptance Testing Cost Support - Production Engineering Cost Production Engineering - - 3.596 - - 0.154 - - - - - 0.127 - - - - - 0.127 Subtotal: Support Production Engineering Cost - - 3.596 - - 0.154 - - - - - 0.127 - - - - - 0.127 Gross/Weapon System Cost - - 31.994 - - 0.935 - - - - - 0.127 - - - - - 0.127 (†) indicates the presence of a P-5a LI 2790E55400 - Demolition Munitions, All Types Army UNCLASSIFIED Page 62 of 63 P-1 Line #25 Volume 1 - 654 === page 687 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements Complete Round O O C P-1 Line Item Number / Title: 2790E55400 / Demolition Munitions, All Types FY Contractor and Location 2025 ENSIGN-BICKFORD AEROSPACE & DEFENSE / SIMSBURY, CT LI 2790E55400 - Demolition Munitions, All Types Army Method/Type or Funding Vehicle Option / FFP Location of PCO PICATINNY ARSENAL, NJ UNCLASSIFIED Page 63 of 63 Item Number / Title [DODIC]: E99905 / CAP, Blast, Non-Elec, 1000Ft Minitube, M23 [MN90] Award Date Date of First Delivery Apr 2025 Apr 2026 P-1 Line #25 Qty (Each) 8,240 Specs Date Unit Cost Avail Revision Now? Available ($) 94.77 RFP Issue Date N Volume 1 - 655 === page 688 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 1,406.499 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 1,406.499 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 1,406.499 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 69.867 58.530 66.845 - 66.845 67.417 69.417 70.545 71.464 - - - - - - - - - - - 69.867 58.530 66.845 - 66.845 67.417 69.417 70.545 71.464 - - - - - - - - - - - 69.867 58.530 66.845 - 66.845 67.417 69.417 70.545 71.464 - Total 1,880.584 1,880.584 1,880.584 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line includes Grenades, All Types. (E00500) GRENADE 66MM VEH LNCHD WHITE SMK SCREENING TNG M82 M82 Simulant Smoke Grenade is a 66mm fielded grenade used to train in the usage and deployment of the M76 infra-red, M81 graphite, brass flake and L8 Red Phosphorus grenades. M82 contains the same internal and external components of the tactical M76 grenade except for a new fill material (titanium dioxide in place of the brass flake powder) along with a reduction in the amount of black powder contained in the propellant. The grenade is electrically initiated and propellant-launched to disseminate a visual screen cloud at a distance of roughly 30 meters away from the combat equipped vehicle. This item is code A, approved for service use. (E31900) FUZE GRENADE HAND PRAC M228 Fuze Grenade Hand Practice M228 is a pyrotechnic delay-igniting fuze (delay time of 4 to 5.5 seconds) used with the M69 practice grenade body. The grenade is identical in size, shape and weight to the M67 fragmentation hand grenade. It is used to learn about the grenade as well to practice grenade throwing skills; thereby improving warfighter knowledge and use of it. The fuze contains a primer, a pyrotechnic delay column and a black powder output charge (to generate an audible report). A striker, striker spring, safety lever, safety pin with pull ring, safety clip, and igniter assembly are assembled to the body. This item is Code A, approved for service use. (E31911) GRENADE, HAND SMOKE SCREENING, M330 M330 is an improved obscurant grenade that provides the warfighter with screening performance equivalent to the legacy AN-M8 smoke grenade. M330 will replace the toxic carcinogen fill used in the ANM8 smoke grenade with a environmentally friendly formulation. The legacy AN-M8 has been restricted to use in contingency operations due to its toxic effects. The M83 training smoke grenade currently used in lieu of AN-M8, in both training and tactical operations, does not give the screening performance comparable to the legacy AN-M8. Soldiers must also use three M83 grenades to produce obscuration effects comparable to a single AN-M8 grenade. M330 will not only reduce the Soldier's combat load but will also provide sufficient tactical obscuration compared to M83 thereby increasing Soldier mobility and survivability during operations under enemy fire. (E32000) GRENADE HAND FRAG DELAY M67 Grenade Hand Fragmentation Delay M67 consists of a 2.5-inch diameter steel sphere that is designed to burst into numerous fragments when detonated. The grenade body is filled with approximately 5.4 ounces of high explosive Composition B. Each grenade is fitted with an M213 fuze that initiates the explosive charge within 4 to 5.5 seconds after the release of the safety lever. M67 Hand Grenade provides the Soldier LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 1 of 47 P-1 Line #26 Volume 1 - 656 === page 689 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A with the capability to conduct pre-mobilization training and close combat operations. M67 is an enabler for Soldier Lethality as it provides Soldiers with a highly effective capability that is easy to throw and can produce casualties to enemy combatants via a 15- meter fragmentation radius. This capability allows for increased lethality of dismounted Soldiers making the unit more efficient and lethal. This item is Code A, approved for service use. (E33010) GRENADE HAND OFFENSIVE M111 M111 Offensive Hand Grenade (OHG) consists of a plastic octagonal-shape body designed to provide lethal blast overpressures that are effective in indoor and close combat environments where fragments are not desired to reduce collateral damage. Each grenade is filled with PAX-3 pressed explosive and is fitted with a M213 pyrotechnical delay fuze that initiates the explosive charge. The M111 OHG is an enabler for Soldier lethality as it produces blast overpressures against enemy troops in indoor areas, bunkers, trench lines, and tunnels. This capability allows for increased lethality of dismounted Soldiers making the unit more efficient and lethal. The M111 OHG is a environmentally friendly replacement for the MK3A2 OHG, which contains asbestos. This item is Code A, approved for service use and was approved for Full Material Release in October 2025. (E34001) GRENADE HAND SMOKE GREEN M18 The M18 is an enabler for Soldier Lethality as it provides the Warfighter with multi-functional capability that provides both effective marking and screening allowing the unit to be more efficient and effective in combat operations. Grenade Hand Smoke Green M18 is used by the Soldier for ground-to-air or ground-to-ground signaling while conducting training and combat operations. Each grenade will emit smoke for 50 to 90 seconds. The grenade body is made of a thin sheet metal filled with starter patches and a green smoke composition. The Hand Grenade Fuze (M201A1) is a pyrotechnic delay-igniting fuze. The body contains a primer, first-fire mix, pyrotechnic delay column, and ignition mixture. Assembled to the body are a striker, striker spring, safety lever and safety pin with pull ring. This item is Code A, approved for service use. (E34002) GRENADE HAND SMOKE YELLOW M18 The M18 is an enabler for Soldier Lethality as it provides the Warfighter with multi-functional capability that provides both effective marking and screening allowing the unit to be more efficient and effective in combat operations. Grenade Hand Smoke Yellow M18 is used by the Warfighter for ground-to-air or ground-to-ground signaling while conducting training and combat operations. Each grenade will emit smoke for 50 to 90 seconds. The grenade body is made of a thin sheet metal, filled with starter patches and a yellow smoke composition. The Hand Grenade Fuze (M201A1) is a pyrotechnic delay-igniting fuze. The body contains a primer, first-fire mix, pyrotechnic delay column, and ignition mixture. Assembled to the body are a striker, striker spring, safety lever, and safety pin with pull ring. This item is Code A, approved for service use. (E34003) GRENADE HAND SMOKE RED M18 The M18 is an enabler for Soldier Lethality as it provides the Warfighter with multi-functional capability that provides both effective marking and screening allowing the unit to be more efficient and effective in combat operations. Grenade Hand Smoke Red M18 is used by the Warfighter for ground-to-air or ground-to-ground signaling while conducting training and combat operations. Each grenade will emit smoke for 50 to 90 seconds. The grenade body is made of a thin sheet metal filled with starter patches and a red smoke composition. The Hand Grenade Fuze (M201A1) is a pyrotechnic delay-igniting fuze. The body contains a primer, first-fire mix, pyrotechnic delay column, and ignition mixture. Assembled to the body are a striker, striker spring, safety lever, and safety pin with pull ring. This item is Code A, approved for service use. (E34004) GRENADE HAND SMOKE VIOLET M18 The M18 is an enabler for Soldier Lethality as it provides the Warfighter with multi-functional capability that provides both effective marking and screening allowing the unit to be more efficient and effective in combat operations. Grenade Hand Smoke Violet M18 is used by the Warfighter for ground-to-air or ground-to-ground signaling while conducting training and combat operations. Each grenade will emit smoke for 50 to 90 seconds. The grenade body is made of a thin sheet metal filled with starter patches and a violet smoke composition. The Hand Grenade (Fuze M201A1) is a pyrotechnic delay-igniting fuze. The body contains a primer, first-fire mix, pyrotechnic delay column and ignition mixture. Assembled to the body are a striker, striker spring, safety lever, and safety pin with pull ring. This item is Code A, approved for service use. (E34005) HAND SMOKE VISUAL RESTRICTED TERRAIN M106 The M106 is an enabler to Soldier Lethality as it provides the Warfighter with an instant screening capability which will increase self-protection and maneuver during crucial times allowing the Warfighter to be more efficient and effective in combat operations. Grenade Hand Smoke Visual Restricted M106 rapidly produces a short duration obscurant cloud LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 2 of 47 P-1 Line #26 Volume 1 - 657 === page 690 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A that provides the Warfighter the capability to obscure the light visible spectrum within restrictive terrain, such as caves and urban structures. It is non-toxic and designed to be safer than current smoke grenades. The fill is non-combustible Titanium Dioxide. This item is code B, not approved for service use (E35801) BODY GRENADE HAND PRAC M112 The M112 Practice Offensive Hand Grenade (POHG) is a reloadable training grenade for the M111 OHG. It consists of a steel octagonal-shape body with the M228 practice grenade fuze to simulate the visual and audible sounds of the M111 OHG. The M112 POHG is identical in size, shape and weight to the M111 OHG. Its purpose is to familiarize Soldiers with the components, characteristics and functioning of the M111 OHG as well as provide realistic training on arming and employing the munition. This item is Code A, approved for service use and was approved for Full Material Release in October 2025. (E69300) GRENADE HAND SMOKE WHITE M83 Grenade Hand Smoke (White) M83 provides the Warfighter the capability to generate white smoke for screening activities while conducting small unit operations in both training and tactical combat operations. It is also used for ground-to-air signaling. This grenade is the tactical interim replacement for the M8 HC Smoke Grenade, which was found to be carcinogenic. The duration of smoke screen or signal is 25 to 70 seconds, average burn time. The grenade body is a cylinder of thin sheet metal. It is filled with non-toxic smoke mixture topped with a starter patch. The Hand Grenade Fuze (M201A1) is a pyrotechnic delayigniting fuze. The body contains a primer, first-fire mix, pyrotechnic delay column, and ignition mixture. Assembled to the body are a striker, striker spring, safety lever, and safety pin with pull ring. This item is Code A, approved for service use. LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 3 of 47 P-1 Line #26 Volume 1 - 658 === page 691 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD P-5a A P-5 E00500 / GRENADE 66MM VEH LNCHD WHITE SMK SCREENING TNG M82 [G978] P-5 E31900 / FUZE, Grenade, Hand, Practice, M228 [G878] P-5 E31911 / GRENADE, HAND:SMOKE, SCREENING, M330 P-5a A P-5 E32000 / GRENADE, Hand, Frag, Delay, M67 [G881] P-5a, P-21 A P-5 E32200 / GRENADE HAND INCENDIARY M14 [G900] P-5 E33010 / GRENADE, HAND OFFENSIVE, M111 P-5a, P-21 P-5 E34001 / GRENADE, Hand, Smoke, Green, M18 [G940] P-5 E34002 / GRENADE, Hand, Smoke, Yellow, M18 [G945] P-5 MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 51.623 - / 16.395 - / 2.933 - / 2.998 - / - - / 2.998 - / 296.181 - / 3.723 - / 2.276 - / 3.274 - / - - / 3.274 / 2.968 - / 0.100 - / 3.033 - / 3.084 - / - - / 3.084 - / 383.613 - / 7.522 - / 10.643 - / 15.761 - / - - / 15.761 A - / 35.454 - / 0.970 / - - / - A - / 41.190 - / 11.498 - / 18.730 - / 20.790 - / - - / 20.790 P-5a A - / 185.787 - / 6.092 - / 3.054 - / 3.432 - / - - / 3.432 P-5a A - / 117.080 - / 5.827 - / 1.549 - / 1.626 - / - - / 1.626 E34003 / GRENADE, Hand, Smoke, Red, M18 P-5a A - / 65.875 - / 7.893 - / 4.465 - / 3.468 - / - - / 3.468 P-5 E34004 / GRENADE, Hand, Smoke, Violet, M18 [G955] P-5a A - / 71.273 - / 5.657 - / 4.287 - / 3.526 - / - - / 3.526 P-5 E34005 / GRENADE, Hand Smoke Visual Restricted Terrain M106 [GG25] - / 31.083 - / 1.000 / - - / - P-5 E35801 / BODY, PRACTICE HAND GRENADE, OFFENSIVE, M112 [GG38] P-5a A P-5 E69300 / GRENADE, Hand, Smoke, White, M83 [G982] P-5a A P-40 Total Gross/Weapon System Cost A - B - / 5.175 - - - / - - / - - - - / - / - / - - / 3.600 - / 4.747 - / - - / 119.197 - / 3.190 - / 3.960 - / 4.139 - / - - / 4.747 / 4.139 / 1,406.499 - / 69.867 - / 58.530 - / 66.845 - / - - / 66.845 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 base budget supports critical Army Title 10 war reserve/operational, training, and test requirements in accordance with DoDI Instruction 3000.04 (Munitions Requirements Process) and Army Regulation (AR) 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War (OSW) approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. FY 2027 Total Base dollars in the amount of $66.845 million supports procurement of eleven variants of Grenades. (E00500) GRENADE 66M VEH LNCHD WHITE SMK SCREENING TNG M82 This training unique item is not used in combat. FY 2027 request supports annual training and builds a depot level in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $2.998 million supports the procurement of 2,035 grenades. Effort is performed at Pine Bluff Arsenal (Pine Bluff, Arkansas). TYPE CLASSIFICATION DATE: July 1992 LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 4 of 47 P-1 Line #26 Volume 1 - 659 === page 692 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A (E31900) FUZE GRENADE HAND PRAC M228 This training unique item is not used in combat. FY 2027 request supports annual training and builds a depot level in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $3.274 million supports the procurement of 88,753 fuzes. TYPE CLASSIFICATION DATE: March 1971. (E31911) GRENADE, HAND SMOKE SCREENING, M330 This war reserve item is only used in combat. FY 2027 request builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $3.084 million supports the procurement of 3,669 grenades. TYPE CLASSIFICATION DATE: June 2026 (E32000) GRENADE HAND FRAG DELAY M67 This is a training standard item used in both training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $15.761 million supports the procurement of 158,045 grenades. TYPE CLASSIFICATION DATE: March 1970 (E33010) GRENADE HAND OFFENSIVE M111 This is a training standard item used in both training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $20.790 million supports the procurement of 55,495 grenades. TYPE CLASSIFICATION DATE: March 2020 (E34001) GRENADE HAND SMOKE GREEN M18 This is a training standard item used in both training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $3.432 million supports the procurement of 22,548 grenades. Effort is performed at Pine Bluff Arsenal (Pine Bluff, Arkansas). TYPE CLASSIFICATION DATE: September 1943 (E34002) GRENADE HAND SMOKE YELLOW M18 This is a training standard item used in both training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $1.626 million supports the procurement of 9,733 grenades. Effort is performed at Pine Bluff Arsenal (Pine Bluff, Arkansas). TYPE CLASSIFICATION DATE: September 1943 (E34003) GRENADE HAND SMOKE RED M18 This is a training standard item used in both training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $3.468 million supports the procurement of 20,763 grenades. Effort is performed at Pine Bluff Arsenal (Pine Bluff, Arkansas). TYPE CLASSIFICATION DATE: September 1943. (E34004) GRENADE HAND SMOKE VIOLET M18 This is a training standard item used in both training and in combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $3.526 million supports the procurement of 22,088 grenades. Effort is performed at Pine Bluff Arsenal (Pine Bluff, Arkansas). TYPE CLASSIFICATION DATE: September 1943 (E35801) GRENADE HAND BODY PRACTICE OFFENSIVE M112 LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 5 of 47 P-1 Line #26 Volume 1 - 660 === page 693 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A This is a training unique item not used in combat. FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $4.747 million supports the procurement of 52,601 grenades. TYPE CLASSIFICATION DATE: March 2020 (E69300) GRENADE HAND SMOKE WHITE M83 This is a training standard item used in both training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $4.139 million supports the procurement of 30,851 grenades. Effort is performed at Pine Bluff Arsenal (Pine Bluff, Arkansas). TYPE CLASSIFICATION DATE: July 1994 LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 6 of 47 P-1 Line #26 Volume 1 - 661 === page 694 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E00500 / GRENADE 66MM VEH LNCHD WHITE SMK SCREENING TNG M82 [G978] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 51.623 16.395 2.933 2.998 - 2.998 - - - - - - 51.623 16.395 2.933 2.998 - 2.998 - - - - - - 51.623 16.395 2.933 2.998 - 2.998 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 478.93 49,162 23.545 583.90 28,078 16.395 581.66 3,164 1.840 765.55 2,035 1.558 - - - 765.55 2,035 1.558 Subtotal: Recurring Cost - - 23.545 - - 16.395 - - 1.840 - - 1.558 - - - - - 1.558 - - 23.545 - - 16.395 - - 1.840 - - 1.558 - - - - - 1.558 First Article Test - - 0.195 - - - - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 0.195 - - - - - - - - - - - - - - - - - 0.731 - - - - - - - - - - - - - - - - - 0.731 - - - - - - - - - - - - - - - Production Engineering - - 26.938 - - - - - 1.093 - - 1.440 - - - - - 1.440 Subtotal: Support Production Engineering Cost - - 26.938 - - - - - 1.093 - - 1.440 - - - - - 1.440 - - 0.023 - - - - - - - - - - - - - - - ROUND Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Product Improvement Cost Reliability Subtotal: Support - Product Improvement Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 7 of 47 P-1 Line #26 Volume 1 - 662 === page 695 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E00500 / GRENADE 66MM VEH LNCHD WHITE SMK SCREENING TNG M82 [G978] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Subtotal: Support - Quality Assurance Cost ($) - FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - 0.023 - - - - - - - - - - - - - - - - - 0.030 - - - - - - - - - - - - - - - - - 0.030 - - - - - - - - - - - - - - - Support - Staging and Transportation Cost Staging and Transportation Subtotal: Support - Staging and Transportation Cost Support - Study & Analysis Cost - - 0.161 - - - - - - - - - - - - - - - Subtotal: Support - Study & Analysis Cost Study & Analysis - - 0.161 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 51.623 - - 16.395 - - 2.933 - - 2.998 - - - - - 2.998 Remarks: FY 2026 to FY 2027 funding increase reflects procurement of ammunition needed to meet training and depot level requirements. FY 2027 hardware unit price increase due to updated depot rates. Production engineering cost fluctuations across FY 2026 to FY 2027 due to changes support required and reflects the pro-rated share of support costs within the BLIN. (†) indicates the presence of a P-5a LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 8 of 47 P-1 Line #26 Volume 1 - 663 === page 696 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements COMPLETE ROUND COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 PINE BLUFF ARSENAL / PINE BLUFF, AR Option / FFP ROCK ISLAND ARSENAL, IL Aug 2025 Aug 2026 28,078 583.90 Y 2026 PINE BLUFF ARSENAL / PINE BLUFF, AR Option / FFP ROCK ISLAND ARSENAL, IL May 2026 May 2027 3,164 581.66 Y 2027 PINE BLUFF ARSENAL / PINE BLUFF, AR Option / FFP ROCK ISLAND ARSENAL, IL May 2027 May 2028 2,035 765.55 Y LI 4582E34000 - Grenades, All Types Army Location of PCO Item Number / Title [DODIC]: E00500 / GRENADE 66MM VEH LNCHD WHITE SMK SCREENING TNG M82 [G978] UNCLASSIFIED Page 9 of 47 P-1 Line #26 (Each) RFP Issue Date Volume 1 - 664 === page 697 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E31900 / FUZE, Grenade, Hand, Practice, M228 [G878] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 3.723 2.276 3.274 - 3.274 - Gross/Weapon System Cost ($ in Millions) 296.181 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 296.181 Plus CY Advance Procurement ($ in Millions) - - - - - 3.723 2.276 3.274 - 3.274 - Total Obligation Authority ($ in Millions) 296.181 FY 2027 Total - - - - - 3.723 2.276 3.274 - 3.274 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE ROUND 14.81 16.29 125,622 2.046 16.86 78,480 1.323 24.59 88,753 2.182 - - - 24.59 88,753 3.23 211,863 0.684 - - - - - - - - - - - - - 2.731 - - 1.323 - - 2.182 - - - - - 2.182 - - 2.731 - - 1.323 - - 2.182 - - - - - 2.182 0.014 - - - - - - - - - - - - - - - 0.083 - - - - - - - - - - - - - - - - 0.097 - - - - - - - - - - - - - - - - - 0.497 - - - - - - - - - - - - - - - - - 0.115 - - - - - - - - - - - - - - - - - 0.612 - - - - - - - - - - - - - - - Production Engineering - - 7.213 - - 0.981 - - 0.953 - - 1.078 - - - - - 1.078 Subtotal: Support Production Engineering Cost - - 7.213 - - 0.981 - - 0.953 - - 1.078 - - - - - 1.078 - - 0.074 - - 0.012 - - - - - 0.013 - - - - - 0.013 RECAP 18,921,541 280.266 - - - - 280.266 - - - 280.266 Acceptance Test - - First Article Test - - Subtotal: Support Acceptance Testing Cost - Safety Reliability Subtotal: Recurring Cost Subtotal: Hardware Cost - 2.182 Support - Acceptance Testing Cost Support - Product Improvement Cost Subtotal: Support - Product Improvement Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 10 of 47 P-1 Line #26 Volume 1 - 665 === page 698 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E31900 / FUZE, Grenade, Hand, Practice, M228 [G878] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Subtotal: Support - Quality Assurance Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 0.074 - - 0.012 - - - - - 0.013 - - - - - 0.013 Recapitalization - - 7.433 - - - - - - - - - - - - - - - Subtotal: Support Recapitalization Cost - - 7.433 - - - - - - - - - - - - - - - - - 0.191 - - - - - - - - - - - - - - - - - 0.191 - - - - - - - - - - - - - - - Support - Recapitalization Cost Support - Staging and Transportation Cost Staging and Transportation Subtotal: Support - Staging and Transportation Cost Support - Study & Analysis Cost - - 0.289 - - - - - - - - - - - - - - - Subtotal: Support - Study & Analysis Cost Study & Analysis - - 0.289 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 296.181 - - 3.723 - - 2.276 - - 3.274 - - - - - 3.274 Remarks: FY 2026 to FY 2027 funding increase reflects procurement of ammunition needed to meet training and depot level requirements. FY 2027 hardware unit price is based on latest government independent cost estimate. Production engineering cost fluctuations across FY 2026 to FY 2027 due to changes support required and reflects the pro-rated share of support costs within the BLIN. LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 11 of 47 P-1 Line #26 Volume 1 - 666 === page 699 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E31911 / GRENADE, HAND:SMOKE, SCREENING, M330 MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 2.968 0.100 3.033 3.084 - 3.084 - - - - - - 2.968 0.100 3.033 3.084 - 3.084 - - - - - - 2.968 0.100 3.033 3.084 - 3.084 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, 204.63 12,336 2.524 - - - 213.31 8,284 1.767 217.71 3,669 0.799 - - - 217.71 3,669 0.799 13.61 12,829 0.175 - - - 14.44 8,615 0.124 15.92 3,815 0.061 - - - 15.92 3,815 0.061 1.18 13,323 0.016 - - - 1.49 8,946 0.013 1.29 3,962 0.005 - - - 1.29 3,962 0.005 1.18 13,323 0.016 - - - 1.49 8,946 0.013 1.41 3,962 0.006 - - - 1.41 3,962 0.006 - - 2.730 - - - - - 1.918 - - 0.870 - - - - - 0.870 - - 2.730 - - - - - 1.918 - - 0.870 - - - - - 0.870 Production Engineering - - 0.238 - - 0.097 - - 1.112 - - 2.214 - - - - - 2.214 Subtotal: Support Production Engineering Cost - - 0.238 - - 0.097 - - 1.112 - - 2.214 - - - - - 2.214 (†) PACK (LAP) FUZE,HAND GRENADE M201 TOP, GREN (†) (†) (†) BODY, GREN Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - - - - 0.003 - - 0.003 - - - - - - - - - Subtotal: Support - Quality Assurance Cost - - - - - 0.003 - - 0.003 - - - - - - - - - Gross/Weapon System Cost - - 2.968 - - 0.100 - - 3.033 - - 3.084 - - - - - 3.084 Remarks: LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 12 of 47 P-1 Line #26 Volume 1 - 667 === page 700 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E31911 / GRENADE, HAND:SMOKE, SCREENING, M330 MDAP/MAIS Code: FY 2026 to FY 2027 funding increase due to ramping up production after program achieves Type Classification Standard in FY 2026. Production engineering cost fluctuations across FY 2025 to FY 2027 due to changes support required and reflects the pro-rated share of support costs within the BLIN. (†) indicates the presence of a P-5a LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 13 of 47 P-1 Line #26 Volume 1 - 668 === page 701 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) FUZE,HAND GRENADE M201 FUZE,HAND GRENADE M201 TOP, GREN TOP, GREN BODY, GREN BODY, GREN O O C P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL Feb 2027 Apr 2028 8,284 213.31 Y 2027 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL Feb 2027 Apr 2028 3,669 217.71 Y 2026 DAY & ZIMMERMANN LONE STAR / TEXARKANA, TX Option / FFP ROCK ISLAND ARSENAL, IL Feb 2027 Apr 2028 8,615 14.44 Y 2027 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL Feb 2027 Apr 2028 3,815 15.92 Y 2026 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL Feb 2027 Apr 2028 8,946 1.49 N 2027 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL Feb 2027 Apr 2028 3,962 1.29 Y 2026 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL Feb 2027 Apr 2028 8,946 1.49 N 2027 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL Feb 2027 Apr 2028 3,962 1.41 Y LI 4582E34000 - Grenades, All Types Army Location of PCO Item Number / Title [DODIC]: E31911 / GRENADE, HAND:SMOKE, SCREENING, M330 UNCLASSIFIED Page 14 of 47 P-1 Line #26 (Each) RFP Issue Date Volume 1 - 669 === page 702 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E32000 / GRENADE, Hand, Frag, Delay, M67 [G881] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 7.522 10.643 15.761 - 15.761 - Gross/Weapon System Cost ($ in Millions) 383.613 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 383.613 Plus CY Advance Procurement ($ in Millions) - - - - - 7.522 10.643 15.761 - 15.761 - Total Obligation Authority ($ in Millions) 383.613 FY 2027 Total - - - - - 7.522 10.643 15.761 - 15.761 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) GRENADE 67.35 Subtotal: Recurring Cost 5,420,460 365.079 45.09 151,712 6.841 58.05 141,993 8.243 75.79 158,045 11.978 - - - 75.79 158,045 11.978 - - 365.079 - - 6.841 - - 8.243 - - 11.978 - - - - - 11.978 - - 365.079 - - 6.841 - - 8.243 - - 11.978 - - - - - 11.978 - - 0.030 - - - - - - - - - - - - - - - - - 0.030 - - - - - - - - - - - - - - - Production Verification Test - - 0.709 - - - - - - - - - - - - - - - Safety - - 0.023 - - - - - - - - - - - - - - - Reliability - - 0.282 - - - - - - - - - - - - - - - - - 1.014 - - - - - - - - - - - - - - - Production Engineering - - 17.336 - - 0.681 - - 2.389 - - 3.768 - - - - - 3.768 Subtotal: Support Production Engineering Cost - - 17.336 - - 0.681 - - 2.389 - - 3.768 - - - - - 3.768 Subtotal: Hardware Cost Support - Demilitarization Cost TRANSPORTATION Subtotal: Support Demilitarization Cost Support - Product Improvement Cost Subtotal: Support - Product Improvement Cost Support - Production Engineering Cost Support - Quality Assurance Cost LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 15 of 47 P-1 Line #26 Volume 1 - 670 === page 703 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E32000 / GRENADE, Hand, Frag, Delay, M67 [G881] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Quality Assurance - - 0.105 - - - - - 0.011 - - 0.013 - - - - - 0.013 Subtotal: Support - Quality Assurance Cost - - 0.105 - - - - - 0.011 - - 0.013 - - - - - 0.013 Support - Study & Analysis Cost - - 0.049 - - - - - - - - - - - - - - - Subtotal: Support - Study & Analysis Cost Study & Analysis - - 0.049 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 383.613 - - 7.522 - - 10.643 - - 15.761 - - - - - 15.761 Remarks: FY 2026 to FY 2027 funding increase due to additional procurement of ammunition to meet training and war reserve requirements. FY 2027 hardware unit price is based on latest government independent cost estimate. Production engineering cost fluctuations across FY 2026 to FY 2027 due to changes in planned procurement and reflects the pro-rated share of support costs within the BLIN. (†) indicates the presence of a P-5a LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 16 of 47 P-1 Line #26 Volume 1 - 671 === page 704 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements (†) COMPLETE GRENADE (†) COMPLETE GRENADE (†) COMPLETE GRENADE (†) O O C P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E32000 / GRENADE, Hand, Frag, Delay, M67 [G881] Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 DAY & ZIMMERMAN LONE STAR / TEXARKANA, TX Option / FPIF ROCK ISLAND ARSENAL, IL Sep 2025 Sep 2026 151,712 45.09 Y 2026 DAY & ZIMMERMAN LONE STAR / TEXARKANA, TX Option / FFP ROCK ISLAND ARSENAL, IL May 2026 May 2027 141,993 58.05 Y 2027 DAY & ZIMMERMAN LONE STAR / TEXARKANA, TX Option / FPIF ROCK ISLAND ARSENAL, IL May 2027 May 2028 158,045 75.79 Y RFP Issue Date indicates the presence of a P-21 LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 17 of 47 P-1 Line #26 Volume 1 - 672 === page 705 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E32000 / GRENADE, Hand, Frag, Delay, M67 [G881] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE GRENADE Prior Years Deliveries: 5420460 1 2025 ARMY 151.712 .000 151.712 1 2026 ARMY 141.993 .000 141.993 1 2027 ARMY 158.045 .000 158.045 A - - - - - - - - - - - A - - - - 15.000 136.712 - 141.993 158.045 O C T LI 4582E34000 - Grenades, All Types Army - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 18 of 47 S E P O C T N O V D E C J A N F E B P-1 Line #26 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 673 === page 706 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E32000 / GRENADE, Hand, Frag, Delay, M67 [G881] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE GRENADE Prior Years Deliveries: 5420460 1 2025 ARMY 151.712 1 2026 ARMY 141.993 15.000 136.712 15.000 15.000 15.000 15.000 15.000 15.000 15.000 15.000 15.000 .000 141.993 1 2027 ARMY 158.045 .000 158.045 - - - - - - N O V D E C J A N F E B M A R A P R 1.712 .000 41.993 50.000 50.000 A - O C T LI 4582E34000 - Grenades, All Types Army - M A Y J U N .000 J U L A U G UNCLASSIFIED Page 19 of 47 S E P O C T N O V D E C J A N F E B P-1 Line #26 M A R A P R 58.045 50.000 50.000 M A Y J U N J U L .000 A U G S E P Volume 1 - 674 === page 707 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Item Number / Title [DODIC]: E32000 / GRENADE, Hand, Frag, Delay, M67 [G881] Production Rates (Each / Month) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 DAY & ZIMMERMAN LONE STAR - TEXARKANA, TX MSR For 2027 1-8-5 For 2027 MAX For 2027 30,000 50,000 100,000 ALT Prior to Oct 1 ALT After Oct 1 8 Reorder Manufacturing PLT 6 18 Total After Oct 1 ALT Prior to Oct 1 24 ALT After Oct 1 8 Manufacturing PLT 6 Total After Oct 1 12 18 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 20 of 47 P-1 Line #26 Volume 1 - 675 === page 708 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E32200 / GRENADE HAND INCENDIARY M14 [G900] MDAP/MAIS Code: Resource Summary Prior Years FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - - Gross/Weapon System Cost ($ in Millions) 35.454 0.970 - - - - Less PY Advance Procurement ($ in Millions) - - - - - - 35.454 0.970 - - - - - - - - - - 35.454 0.970 - - - - Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost FY 2025 Total Cost Qty ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty ($) (Each) (Each) ($ M) Load, Assemble, Pack (Lap) 144.33 137,488 19.843 - - - - - - - - - - - - - - - FUZE,HAND GRENADE M201 12.96 184,925 2.397 - - - - - - - - - - - - - - - TOP, GREN 1.17 168,040 0.196 - - - - - - - - - - - - - - - BODY, GREN 1.17 168,040 0.196 - - - - - - - - - - - - - - - Hardware Cost Recurring Cost Subtotal: Recurring Cost - - 22.631 - - - - - - - - - - - - - - - - - 22.631 - - - - - - - - - - - - - - - Equipment Acquisition or Modernization - - 0.757 - - - - - - - - - - - - - - - Subtotal: Support - Industrial Facilities Cost - - 0.757 - - - - - - - - - - - - - - - Production Engineering - - 12.048 - - 0.970 - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - 12.048 - - 0.970 - - - - - - - - - - - - Quality Assurance - - 0.017 - - - - - - - - - - - - - - - Subtotal: Support - Quality Assurance Cost - - 0.017 - - - - - - - - - - - - - - - Subtotal: Hardware Cost Support - Industrial Facilities Cost Support - Production Engineering Cost Support - Quality Assurance Cost LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 21 of 47 P-1 Line #26 Volume 1 - 676 === page 709 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E32200 / GRENADE HAND INCENDIARY M14 [G900] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Gross/Weapon System Cost Unit Cost ($) - FY 2025 Total Cost Qty (Each) ($ M) - LI 4582E34000 - Grenades, All Types Army 35.454 Unit Cost ($) - FY 2026 Total Cost Qty (Each) ($ M) - 0.970 Unit Cost ($) - FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) - ($) - UNCLASSIFIED Page 22 of 47 - FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) - ($) - - P-1 Line #26 FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) - ($) - - Total Cost Qty (Each) ($ M) - - Volume 1 - 677 === page 710 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E33010 / GRENADE, HAND OFFENSIVE, M111 MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 41.190 11.498 18.730 20.790 - 20.790 - - - - - - 41.190 11.498 18.730 20.790 - 20.790 - - - - - - 41.190 11.498 18.730 20.790 - 20.790 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost FY 2025 Total Cost Qty ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($) (Each) ($ M) ($) 170.20 127,772 21.746 720.00 348 0.251 - - - - 119.67 15,400 1.843 93.30 16,574 1.546 61.67 - - 23.840 - - 8.418 - - - 23.840 - - 8.418 - - 0.051 - - - - 0.051 - Production Verification Test - - 1.609 Insensitive Munitions - - Production Qualification Test - - Safety - FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Complete Round M111 (†) BDNPA/F Binder PAX 3 (†) (†) Subtotal: Recurring Cost Subtotal: Hardware Cost 175.74 39,104 6.872 233.93 51,426 12.030 238.55 55,495 13.238 - - - 238.55 55,495 13.238 - - 44,739 2.759 85.73 7,214 0.618 - - - 62.94 48,280 3.039 - - - 85.73 7,214 0.618 62.94 48,280 - 14.789 - - 16.896 - - 3.039 - - - 16.896 - - 14.789 - - 16.896 - - - - - 16.896 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.100 3.000 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.126 - - - - - 4.835 - - - - - - - - - - - - - - - - - - - - - - - - - Support - Demilitarization Cost TRANSPORTATION Subtotal: Support Demilitarization Cost Support - Product Improvement Cost Subtotal: Support - Product Improvement Cost Support - Production Engineering Cost LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 23 of 47 P-1 Line #26 Volume 1 - 678 === page 711 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E33010 / GRENADE, HAND OFFENSIVE, M111 MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Production Engineering - - 12.327 - - 3.080 - - 3.941 - - 3.895 - - - - - 3.895 Subtotal: Support Production Engineering Cost - - 12.327 - - 3.080 - - 3.941 - - 3.895 - - - - - 3.895 Quality Assurance - - 0.005 - - - - - - - - - - - - - - - Subtotal: Support - Quality Assurance Cost - - 0.005 - - - - - - - - - - - - - - - - - 0.001 - - - - - - - - - - - - - - - - - 0.001 - - - - - - - - - - - - - - - Support - Quality Assurance Cost Support - Staging and Transportation Cost Staging and Transportation Subtotal: Support - Staging and Transportation Cost Support - Study & Analysis Cost - - 0.131 - - - - - - - - - - - - - - - Subtotal: Support - Study & Analysis Cost Study & Analysis - - 0.131 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 41.190 - - 11.498 - - 18.730 - - 20.790 - - - - - 20.790 Remarks: FY2026 to FY2027 funding increase due to additional procurement of ammunition to meet training and war reserve requirements. A new competitive firm fixed price contract will be awarded in FY 2027. FY 2027 hardware unit price is based on latest government independent cost estimate prior to contract award. To ensure supply chain resilience for the critical PAX-3 explosive binder, BDNPA/F (Bis(2,2-dinitropropyl) Acetal/Formal), a low-cost Outside the Continental United State (OCONUS) second source has been qualified. The Government will direct BDNPA/F sourcing for each M111 OHG procurement ensuring both the primary CONUS supplier and the second source remain available despite the higher cost of domestic supply. Production engineering cost fluctuations across FY 2026 to FY 2027 due to changes in planned procurement and reflects the pro-rated share of support costs within the BLIN. (†) indicates the presence of a P-5a LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 24 of 47 P-1 Line #26 Volume 1 - 679 === page 712 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements (†) Complete Round - M111 (†) Complete Round - M111 (†) Complete Round - M111 BDNPA/F Binder PAX 3 PAX 3 (†) O O C P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Method/Type or Funding Vehicle Item Number / Title [DODIC]: E33010 / GRENADE, HAND OFFENSIVE, M111 Location of PCO Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 DAY & ZIMMERMANN LONE STAR LLC / TEXARKANA, TX Option / FFP Rock Island, IL Aug 2025 Nov 2026 39,104 175.74 N 2026 DAY & ZIMMERMANN LONE STAR LLC / TEXARKANA, TX Option / FPIF Rock Island, IL May 2026 Aug 2027 51,426 233.93 N 2027 TO BE SELECTED / TBS01 C / FFP Rock Island, IL May 2027 Aug 2028 55,495 238.55 N Mar 2027 Mar 2028 7,214 85.73 N (Each) 2027 BAE - BDNPA/F / Kingsport, TN Option / IDIQ ROCK ISLAND ARSENAL, IL 2025 BAE SYSTEMS ORDNANCE SYSTEMS / KINGSPORT, TN Option / IDDQ ROCK ISLAND ARSENAL, IL Aug 2025 Aug 2026 16,574 93.30 N 2027 BAE SYSTEMS ORDNANCE SYSTEMS / KINGSPORT, TN Option / IDIQ ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 48,280 62.94 N RFP Issue Date indicates the presence of a P-21 LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 25 of 47 P-1 Line #26 Volume 1 - 680 === page 713 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E33010 / GRENADE, HAND OFFENSIVE, M111 Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Complete Round - M111 Prior Years Deliveries: 127772 1 2025 ARMY 39.104 .000 39.104 1 2026 ARMY 51.426 .000 51.426 2 2027 ARMY 55.495 .000 55.495 A - - - - - - - - - - - - - 39.104 A - - - - - 51.426 55.495 O C T LI 4582E34000 - Grenades, All Types Army - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 26 of 47 S E P O C T N O V D E C J A N F E B P-1 Line #26 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 681 === page 714 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E33010 / GRENADE, HAND OFFENSIVE, M111 Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Complete Round - M111 Prior Years Deliveries: 127772 1 2025 ARMY 39.104 .000 39.104 - 1 2026 ARMY 51.426 .000 51.426 - 2 2027 ARMY 55.495 .000 55.495 O C T LI 4582E34000 - Grenades, All Types Army 10.000 10.000 10.000 N O V D E C 9.104 J A N .000 F E B M A R A P R - - - A - - - M A Y J U N J U L 11.000 10.426 10.000 10.000 10.000 A U G UNCLASSIFIED Page 27 of 47 S E P O C T N O V .000 D E C J A N F E B P-1 Line #26 M A R A P R M A Y J U N J U L 10.000 10.000 35.495 A U G S E P Volume 1 - 682 === page 715 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E33010 / GRENADE, HAND OFFENSIVE, M111 Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Complete Round - M111 Prior Years Deliveries: 127772 1 2025 ARMY 39.104 39.104 .000 1 2026 ARMY 51.426 51.426 .000 2 2027 ARMY 55.495 20.000 35.495 10.000 10.000 10.000 5.495 O C T J A N LI 4582E34000 - Grenades, All Types Army .000 .000 N O V D E C .000 F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 28 of 47 S E P O C T N O V D E C J A N F E B P-1 Line #26 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 683 === page 716 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Item Number / Title [DODIC]: E33010 / GRENADE, HAND OFFENSIVE, M111 Production Rates (Each / Month) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 DAY & ZIMMERMANN LONE STAR LLC - TEXARKANA, TX 400 1,000 15,000 8 6 24 30 6 6 18 24 2 TO BE SELECTED - TBS01 400 1,000 15,000 8 8 24 32 6 6 18 24 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 29 of 47 P-1 Line #26 Volume 1 - 684 === page 717 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E34001 / GRENADE, Hand, Smoke, Green, M18 [G940] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 6.092 3.054 3.432 - 3.432 - Gross/Weapon System Cost ($ in Millions) 185.787 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 185.787 Plus CY Advance Procurement ($ in Millions) - - - - - 6.092 3.054 3.432 - 3.432 - Total Obligation Authority ($ in Millions) 185.787 FY 2027 Total - - - - - 6.092 3.054 3.432 - 3.432 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Load, Assemble, Pack (Lap) (†) FUZE,HAND GRENADE M201 TOP, GREN (†) 51.74 3,404,701 176.159 67.73 61,296 4.152 71.22 26,351 1.877 97.81 22,548 2.205 - - - 97.81 22,548 2.205 12.74 250,001 3.185 13.90 64,115 0.891 14.44 27,405 0.396 15.92 23,449 0.373 - - - 15.92 23,449 0.373 1.18 225,067 0.266 1.18 67,669 0.080 1.49 28,459 0.042 1.30 24,351 0.032 - - - 1.30 24,351 0.032 1.18 225,067 (†) (†) 0.266 1.32 67,669 0.089 1.49 28,459 0.042 1.42 24,351 0.035 - - - 1.42 24,351 0.035 - - 179.875 - - 5.212 - - 2.357 - - 2.645 - - - - - 2.645 - - 179.875 - - 5.212 - - 2.357 - - 2.645 - - - - - 2.645 First Article Test - - 0.365 - - - - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 0.365 - - - - - - - - - - - - - - - Safety - - 0.271 - - - - - - - - - - - - - - - Reliability - - 0.065 - - - - - - - - - - - - - - - - - 0.336 - - - - - - - - - - - - - - - - - 4.980 - - 0.880 - - 0.697 - - 0.781 - - - - - 0.781 BODY, GREN Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Product Improvement Cost Subtotal: Support - Product Improvement Cost Support - Production Engineering Cost Production Engineering LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 30 of 47 P-1 Line #26 Volume 1 - 685 === page 718 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E34001 / GRENADE, Hand, Smoke, Green, M18 [G940] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Subtotal: Support Production Engineering Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 4.980 - - 0.880 - - 0.697 - - 0.781 - - - - - 0.781 Quality Assurance - - 0.036 - - - - - - - - 0.006 - - - - - 0.006 Subtotal: Support - Quality Assurance Cost - - 0.036 - - - - - - - - 0.006 - - - - - 0.006 - - 0.002 - - - - - - - - - - - - - - - - - 0.002 - - - - - - - - - - - - - - - Support - Quality Assurance Cost Support - Staging and Transportation Cost Staging and Transportation Subtotal: Support - Staging and Transportation Cost Support - Study & Analysis Cost - - 0.211 - - - - - - - - - - - - - - - Subtotal: Support - Study & Analysis Cost Study & Analysis - - 0.211 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 185.787 - - 6.092 - - 3.054 - - 3.432 - - - - - 3.432 Remarks: FY 2026 to FY 2027 funding increase reflects procurement of ammunition needed to meet training and war reserve requirements. FY 2027 hardware unit price increase due to updated depot rates. Production engineering cost fluctuations across FY 2026 to FY 2027 due to changes in planned procurement and reflects the pro-rated share of support costs within the BLIN. (†) indicates the presence of a P-5a LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 31 of 47 P-1 Line #26 Volume 1 - 686 === page 719 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements Load, Assemble, Pack (Lap) Load, Assemble, Pack (Lap) Load, Assemble, Pack (Lap) FUZE,HAND GRENADE M201 FUZE,HAND GRENADE M201 FUZE,HAND GRENADE M201 TOP, GREN TOP, GREN TOP, GREN BODY, GREN BODY, GREN BODY, GREN O O C P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL May 2025 Aug 2026 61,296 67.73 Y 2026 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL May 2026 Aug 2027 26,351 71.22 Y 2027 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL Mar 2027 Jun 2028 22,548 97.81 Y 2025 DAY & ZIMMERMANN LONE STAR / TEXARKANA, TX Option / FFP ROCK ISLAND ARSENAL, IL May 2025 May 2026 64,115 13.90 Y 2026 DAY & ZIMMERMANN LONE STAR / TEXARKANA, TX Option / FFP ROCK ISLAND ARSENAL, IL May 2026 May 2027 27,405 14.44 Y 2027 TO BE SELECTED / TO BE SELECTED Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 23,449 15.92 Y 2025 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL May 2025 May 2026 67,669 1.18 Y 2026 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL May 2026 May 2027 28,459 1.49 Y 2027 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 24,351 1.30 Y 2025 TOOL MASTERS INC. / TUSCUMBIA, AL Option / TBD ROCK ISLAND ARSENAL, IL May 2025 May 2026 67,669 1.32 Y 2026 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL May 2026 May 2027 28,459 1.49 Y 2027 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 24,351 1.42 Y LI 4582E34000 - Grenades, All Types Army Location of PCO Item Number / Title [DODIC]: E34001 / GRENADE, Hand, Smoke, Green, M18 [G940] UNCLASSIFIED Page 32 of 47 P-1 Line #26 (Each) RFP Issue Date Volume 1 - 687 === page 720 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E34002 / GRENADE, Hand, Smoke, Yellow, M18 [G945] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 5.827 1.549 1.626 - 1.626 - Gross/Weapon System Cost ($ in Millions) 117.080 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 117.080 Plus CY Advance Procurement ($ in Millions) - - - - - 5.827 1.549 1.626 - 1.626 - Total Obligation Authority ($ in Millions) 117.080 FY 2027 Total - - - - - 5.827 1.549 1.626 - 1.626 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Load, Assemble, Pack (Lap) (†) FUZE,HAND GRENADE M201 TOP, GREN (†) 65.51 1,637,471 107.263 66.26 57,120 3.785 106.32 8,736 0.929 111.64 9,733 1.087 - - - 111.64 9,733 1.087 12.73 345,060 4.393 13.90 59,406 0.826 14.44 9,084 0.131 15.92 10,122 0.161 - - - 15.92 10,122 0.161 1.18 303,911 0.358 1.18 61,448 0.073 1.29 9,435 0.012 1.29 10,511 0.014 - - - 1.29 10,511 0.014 1.18 303,911 (†) (†) 0.358 1.32 61,448 0.081 1.39 9,435 0.013 1.42 10,511 0.015 - - - 1.42 10,511 0.015 - - 112.371 - - 4.764 - - 1.085 - - 1.276 - - - - - 1.276 - - 112.371 - - 4.764 - - 1.085 - - 1.276 - - - - - 1.276 - - 0.517 - - - - - - - - - - - - - - - - - 0.517 - - - - - - - - - - - - - - - Production Engineering - - 3.922 - - 1.059 - - 0.463 - - 0.350 - - - - - 0.350 Subtotal: Support Production Engineering Cost - - 3.922 - - 1.059 - - 0.463 - - 0.350 - - - - - 0.350 Quality Assurance - - 0.039 - - 0.003 - - - - - - - - - - - - Subtotal: Support - Quality Assurance Cost - - 0.039 - - 0.003 - - - - - - - - - - - - BODY, GREN Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Product Improvement Cost Reliability Subtotal: Support - Product Improvement Cost Support - Production Engineering Cost Support - Quality Assurance Cost LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 33 of 47 P-1 Line #26 Volume 1 - 688 === page 721 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E34002 / GRENADE, Hand, Smoke, Yellow, M18 [G945] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Support - Study & Analysis Cost - - 0.232 - - - - - - - - - - - - - - - Subtotal: Support - Study & Analysis Cost Study & Analysis - - 0.232 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 117.080 - - 5.827 - - 1.549 - - 1.626 - - - - - 1.626 Remarks: FY2026 to FY2027 funding increase reflects procurement of ammunition needed to meet training and depot level requirements. FY 2027 hardware unit price increase due to updated depot rates. Production engineering cost fluctuations across FY2026 to FY2027 due to changes in planned procurement and reflects the pro-rated share of support costs within the BLIN. (†) indicates the presence of a P-5a LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 34 of 47 P-1 Line #26 Volume 1 - 689 === page 722 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements Load, Assemble, Pack (Lap) Load, Assemble, Pack (Lap) Load, Assemble, Pack (Lap) FUZE,HAND GRENADE M201 FUZE,HAND GRENADE M201 FUZE,HAND GRENADE M201 TOP, GREN TOP, GREN TOP, GREN BODY, GREN BODY, GREN BODY, GREN O O C P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL May 2025 Aug 2026 57,120 66.26 Y 2026 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL May 2026 Aug 2027 8,736 106.32 Y 2027 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL Mar 2027 Jun 2028 9,733 111.64 Y 2025 DAY & ZIMMERMANN LONE STAR / TEXARKANA, TX Option / FFP ROCK ISLAND ARSENAL, IL May 2025 May 2026 59,406 13.90 Y 2026 DAY & ZIMMERMANN LONE STAR / TEXARKANA, TX Option / FFP ROCK ISLAND ARSENAL, IL May 2026 May 2027 9,084 14.44 Y 2027 DAY & ZIMMERMANN LONE STAR / TEXARKANA, TX Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 10,122 15.92 Y 2025 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL May 2025 May 2026 61,448 1.18 Y 2026 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL May 2026 May 2027 9,435 1.29 Y 2027 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 10,511 1.29 Y 2025 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL May 2025 May 2026 61,448 1.32 Y 2026 TOOL MASTERS INC. / TUSCUMBIA, AL C / FFPLOE ROCK ISLAND ARSENAL, IL May 2026 May 2027 9,435 1.39 Y 2027 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 10,511 1.42 Y LI 4582E34000 - Grenades, All Types Army Location of PCO Item Number / Title [DODIC]: E34002 / GRENADE, Hand, Smoke, Yellow, M18 [G945] UNCLASSIFIED Page 35 of 47 P-1 Line #26 (Each) RFP Issue Date Volume 1 - 690 === page 723 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E34003 / GRENADE, Hand, Smoke, Red, M18 MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 65.875 7.893 4.465 3.468 - 3.468 - - - - - - 65.875 7.893 4.465 3.468 - 3.468 - - - - - - 65.875 7.893 4.465 3.468 - 3.468 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, (†) PACK (LAP) FUZE,HAND GRENADE M201 TOP, GREN (†) 89.99 670,050 60.298 72.57 73,275 5.318 106.60 28,256 3.012 111.36 20,763 2.312 - - - 111.36 20,763 2.312 13.16 279,507 3.677 13.90 76,794 1.067 14.44 29,386 0.424 15.92 21,593 0.344 - - - 15.92 21,593 0.344 1.17 243,087 0.284 1.18 79,124 0.093 1.29 30,516 0.039 1.30 22,424 0.029 - - - 1.30 22,424 0.029 1.17 243,087 (†) (†) 0.284 1.32 79,124 0.104 1.39 30,516 0.042 1.42 22,424 0.032 - - - 1.42 22,424 0.032 - - 64.543 - - 6.583 - - 3.518 - - 2.717 - - - - - 2.717 - - 64.543 - - 6.583 - - 3.518 - - 2.717 - - - - - 2.717 Production Engineering - - 1.329 - - 1.307 - - 0.942 - - 0.746 - - - - - 0.746 Subtotal: Support Production Engineering Cost - - 1.329 - - 1.307 - - 0.942 - - 0.746 - - - - - 0.746 BODY, GREN Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.002 - - 0.004 - - 0.006 - - 0.005 - - - - - 0.005 Subtotal: Support - Quality Assurance Cost - - 0.002 - - 0.004 - - 0.006 - - 0.005 - - - - - 0.005 Gross/Weapon System Cost - - 65.875 - - 7.893 - - 4.465 - - 3.468 - - - - - 3.468 Remarks: LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 36 of 47 P-1 Line #26 Volume 1 - 691 === page 724 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types ID Code (A=Service Ready, B=Not Service Ready) : A MDAP/MAIS Code: FY 2027 hardware unit price changes due to updated depot rates. (†) Item Number / Title [DODIC]: E34003 / GRENADE, Hand, Smoke, Red, M18 indicates the presence of a P-5a LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 37 of 47 P-1 Line #26 Volume 1 - 692 === page 725 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) FUZE,HAND GRENADE M201 FUZE,HAND GRENADE M201 FUZE,HAND GRENADE M201 TOP, GREN TOP, GREN TOP, GREN BODY, GREN BODY, GREN BODY, GREN O O C P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL May 2025 Aug 2026 73,275 72.57 Y 2026 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL May 2026 Aug 2027 28,256 106.60 Y 2027 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL Mar 2027 Jun 2028 20,763 111.36 Y 2025 DAY & ZIMMERMANN LONE STAR / TEXARKANA, TX Option / FFP ROCK ISLAND ARSENAL, IL May 2025 May 2026 76,794 13.90 Y 2026 DAY & ZIMMERMANN LONE STAR / TEXARKANA, TX Option / FFP ROCK ISLAND ARSENAL, IL May 2026 May 2027 29,386 14.44 Y 2027 DAY & ZIMMERMANN LONE STAR / TEXARKANA, TX Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 21,593 15.92 Y 2025 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL May 2025 May 2026 79,124 1.18 Y 2026 TOOL MASTERS INC. / TUSCUMBIA, AL TBD ROCK ISLAND ARSENAL, IL May 2026 May 2027 30,516 1.29 Y 2027 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 22,424 1.30 Y 2025 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL May 2025 May 2026 79,124 1.32 Y 2026 TOOL MASTERS INC. / TUSCUMBIA, AL TBD ROCK ISLAND ARSENAL, IL May 2026 May 2027 30,516 1.39 Y 2027 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 22,424 1.42 Y LI 4582E34000 - Grenades, All Types Army Location of PCO Item Number / Title [DODIC]: E34003 / GRENADE, Hand, Smoke, Red, M18 UNCLASSIFIED Page 38 of 47 P-1 Line #26 (Each) RFP Issue Date Volume 1 - 693 === page 726 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E34004 / GRENADE, Hand, Smoke, Violet, M18 [G955] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 71.273 5.657 4.287 3.526 - 3.526 - - - - - - 71.273 5.657 4.287 3.526 - 3.526 - - - - - - 71.273 5.657 4.287 3.526 - 3.526 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Load, Assemble, Pack (Lap) (†) FUZE,HAND GRENADE M201 TOP, GREN (†) 65.71 979,049 64.337 74.89 51,478 3.855 78.63 37,200 2.925 104.64 22,088 2.311 - - - 104.64 22,088 2.311 13.06 202,868 2.649 13.90 53,538 0.744 14.44 38,688 0.559 15.92 22,971 0.366 - - - 15.92 22,971 0.366 1.16 192,381 0.223 1.18 55,596 0.066 1.49 40,176 0.060 1.30 23,855 0.031 - - - 1.30 23,855 0.031 1.16 192,381 (†) (†) 0.223 1.32 55,596 0.073 1.49 40,178 0.060 1.42 23,855 0.034 - - - 1.42 23,855 0.034 - - 67.433 - - 4.738 - - 3.603 - - 2.742 - - - - - 2.742 - - 67.433 - - 4.738 - - 3.603 - - 2.742 - - - - - 2.742 Production Verification Test - - 0.017 - - - - - - - - - - - - - - - Subtotal: Support - Product Improvement Cost - - 0.017 - - - - - - - - - - - - - - - Production Engineering - - 3.801 - - 0.919 - - 0.683 - - 0.779 - - - - - 0.779 Subtotal: Support Production Engineering Cost - - 3.801 - - 0.919 - - 0.683 - - 0.779 - - - - - 0.779 - - 0.023 - - - - - - - - 0.005 - - - - - 0.005 BODY, GREN Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Product Improvement Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 39 of 47 P-1 Line #26 Volume 1 - 694 === page 727 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E34004 / GRENADE, Hand, Smoke, Violet, M18 [G955] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Subtotal: Support - Quality Assurance Cost - - 0.023 - - - - - - - - 0.005 - - - - - 0.005 Gross/Weapon System Cost - - 71.273 - - 5.657 - - 4.287 - - 3.526 - - - - - 3.526 Remarks: FY 2027 hardware unit price changed due to updated depot rates. Production engineering cost fluctuations across FY 2026 to FY 2027 due to changes in planned procurement and reflects the pro-rated share of support costs within the BLIN. (†) indicates the presence of a P-5a LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 40 of 47 P-1 Line #26 Volume 1 - 695 === page 728 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements Load, Assemble, Pack (Lap) Load, Assemble, Pack (Lap) Load, Assemble, Pack (Lap) FUZE,HAND GRENADE M201 FUZE,HAND GRENADE M201 FUZE,HAND GRENADE M201 TOP, GREN TOP, GREN TOP, GREN BODY, GREN BODY, GREN BODY, GREN O O C P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL May 2025 Aug 2026 51,478 74.89 Y 2026 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL May 2026 Aug 2027 37,200 78.63 Y 2027 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL Mar 2027 Jun 2028 22,088 104.64 Y 2025 DAY & ZIMMERMANN LONE STAR / TEXARKANA, TX Option / FFP ROCK ISLAND ARSENAL, IL May 2025 May 2026 53,538 13.90 Y 2026 DAY & ZIMMERMANN LONE STAR / TEXARKANA, TX Option / FFP ROCK ISLAND ARSENAL, IL May 2026 May 2027 38,688 14.44 Y 2027 DAY & ZIMMERMANN LONE STAR / TEXARKANA, TX Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 22,971 15.92 Y 2025 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL May 2025 May 2026 55,596 1.18 Y 2026 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL May 2026 May 2027 40,176 1.49 Y 2027 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 23,855 1.30 Y 2025 TO BE SELECTED / TO BE SELECTED Option / FFP ROCK ISLAND ARSENAL, IL May 2025 May 2026 55,596 1.32 Y 2026 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL May 2026 May 2027 40,178 1.49 Y 2027 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 23,855 1.42 Y LI 4582E34000 - Grenades, All Types Army Location of PCO Item Number / Title [DODIC]: E34004 / GRENADE, Hand, Smoke, Violet, M18 [G955] UNCLASSIFIED Page 41 of 47 P-1 Line #26 (Each) RFP Issue Date Volume 1 - 696 === page 729 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E34005 / GRENADE, Hand Smoke Visual Restricted Terrain M106 [GG25] MDAP/MAIS Code: Resource Summary Prior Years FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - - Gross/Weapon System Cost ($ in Millions) 31.083 1.000 - - - - Less PY Advance Procurement ($ in Millions) - - - - - - 31.083 1.000 - - - - - - - - - - 31.083 1.000 - - - - Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Complete Round 155.31 22.805 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 22.805 - - - - - - - - - - - - - - - - - 22.805 - - - - - - - - - - - - - - - First Article Test - - 0.104 - - - - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 0.104 - - - - - - - - - - - - - - - - - 0.914 - - - - - - - - - - - - - - - - - 0.914 - - - - - - - - - - - - - - - Subtotal: Hardware Cost 146,839 Support - Acceptance Testing Cost Support - Product Improvement Cost Safety Subtotal: Support - Product Improvement Cost Support - Production Engineering Cost Production Engineering - - 7.260 - - 1.000 - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - 7.260 - - 1.000 - - - - - - - - - - - - Gross/Weapon System Cost - - 31.083 - - 1.000 - - - - - - - - - - - - LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 42 of 47 P-1 Line #26 Volume 1 - 697 === page 730 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E35801 / BODY, PRACTICE HAND GRENADE, OFFENSIVE, M112 [GG38] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 5.175 - 3.600 4.747 - 4.747 - - - - - - 5.175 - 3.600 4.747 - 4.747 - - - - - - 5.175 - 3.600 4.747 - 4.747 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 38.85 98,976 3.845 - - - 40.82 70,424 2.875 69.36 52,601 3.648 - - - 69.36 52,601 3.648 Subtotal: Recurring Cost - - 3.845 - - - - - 2.875 - - 3.648 - - - - - 3.648 - - 3.845 - - - - - 2.875 - - 3.648 - - - - - 3.648 ROUND Subtotal: Hardware Cost Support - Production Engineering Cost Production Engineering - - 1.330 - - - - - 0.725 - - 1.099 - - - - - 1.099 Subtotal: Support Production Engineering Cost - - 1.330 - - - - - 0.725 - - 1.099 - - - - - 1.099 Gross/Weapon System Cost - - 5.175 - - - - - 3.600 - - 4.747 - - - - - 4.747 Remarks: FY2026 to FY2027 funding increase due to additional procurement of ammunition to meet training and depot level requirements. FY 2027 hardware unit price is based on latest government independent cost estimate. Production engineering cost fluctuations across FY 2026 to FY 2027 due to changes in planned procurement and reflects the pro-rated share of support costs within the BLIN. (†) indicates the presence of a P-5a LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 43 of 47 P-1 Line #26 Volume 1 - 698 === page 731 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 DAY & ZIMMERMANN LONE STAR / TEXARKANA, TX Option / FFP ROCK ISLAND ARSENAL, IL May 2026 Jul 2027 70,424 40.82 Y 2027 DAY & ZIMMERMANN LONE STAR / TEXARKANA, TX Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 May 2028 52,601 69.36 Y LI 4582E34000 - Grenades, All Types Army Location of PCO Item Number / Title [DODIC]: E35801 / BODY, PRACTICE HAND GRENADE, OFFENSIVE, M112 [GG38] UNCLASSIFIED Page 44 of 47 P-1 Line #26 (Each) RFP Issue Date Volume 1 - 699 === page 732 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E69300 / GRENADE, Hand, Smoke, White, M83 [G982] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 3.190 3.960 4.139 - 4.139 - Gross/Weapon System Cost ($ in Millions) 119.197 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 119.197 Plus CY Advance Procurement ($ in Millions) - - - - - 3.190 3.960 4.139 - 4.139 - Total Obligation Authority ($ in Millions) 119.197 FY 2027 Total - - - - - 3.190 3.960 4.139 - 4.139 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, 52.35 2,202,129 115.277 52.60 39,104 2.057 77.52 34,576 2.680 81.40 30,851 2.511 - - - 81.40 30,851 2.511 1.91 258,869 0.494 - - - - - - - - - - - - - - - 13.03 133,112 1.735 13.90 31,250 0.434 14.44 35,989 0.520 15.92 32,084 0.511 - - - 15.92 32,084 0.511 1.18 39,060 0.046 1.18 32,451 0.038 1.27 37,342 0.047 1.30 33,319 0.043 - - - 1.30 33,319 0.043 1.18 39,060 0.046 1.32 32,451 0.043 1.40 37,342 0.052 1.42 33,319 0.047 - - - 1.42 33,319 0.047 - - 117.598 - - 2.572 - - 3.300 - - 3.113 - - - - - 3.113 - - 117.598 - - 2.572 - - 3.300 - - 3.113 - - - - - 3.113 Production Engineering - - 1.567 - - 0.618 - - 0.655 - - 1.020 - - - - - 1.020 Subtotal: Support Production Engineering Cost - - 1.567 - - 0.618 - - 0.655 - - 1.020 - - - - - 1.020 (†) PACK (LAP) GRENADE, METAL PARTS SET FUZE,HAND GRENADE M201 TOP, GREN (†) (†) (†) BODY, GREN Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.032 - - - - - 0.006 - - 0.006 - - - - - 0.006 Subtotal: Support - Quality Assurance Cost - - 0.032 - - - - - 0.006 - - 0.006 - - - - - 0.006 Gross/Weapon System Cost - - 119.197 - - 3.190 - - 3.960 - - 4.139 - - - - - 4.139 LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 45 of 47 P-1 Line #26 Volume 1 - 700 === page 733 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E69300 / GRENADE, Hand, Smoke, White, M83 [G982] MDAP/MAIS Code: Remarks: FY 2026 to FY 2027 funding increase due to additional procurement of ammunition to meet training and war reserve requirements. FY 2027 hardware unit price changes due to updated depot rates. Production engineering cost fluctuations across FY 2026 to FY 2027 due to changes in planned procurement and reflects the pro-rated share of support costs within the BLIN. (†) indicates the presence of a P-5a LI 4582E34000 - Grenades, All Types Army UNCLASSIFIED Page 46 of 47 P-1 Line #26 Volume 1 - 701 === page 734 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) FUZE,HAND GRENADE M201 FUZE,HAND GRENADE M201 FUZE,HAND GRENADE M201 TOP, GREN TOP, GREN TOP, GREN BODY, GREN BODY, GREN BODY, GREN O O C P-1 Line Item Number / Title: 4582E34000 / Grenades, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL May 2025 Aug 2026 39,104 52.60 Y 2026 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL May 2026 Aug 2027 34,576 77.52 Y 2027 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL Mar 2027 Jun 2028 30,851 81.40 Y 2025 DAY & ZIMMERMANN LONE STAR / TEXARKANA, TX Option / FFP ROCK ISLAND ARSENAL, IL May 2025 May 2026 31,250 13.90 Y 2026 DAY & ZIMMERMANN LONE STAR / TEXARKANA, TX Option / FFP ROCK ISLAND ARSENAL, IL May 2026 May 2027 35,989 14.44 Y 2027 DAY & ZIMMERMANN LONE STAR / TEXARKANA, TX Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 32,084 15.92 Y 2025 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL May 2025 May 2026 32,451 1.18 Y 2026 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL May 2026 May 2027 37,342 1.27 Y 2027 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 33,319 1.30 Y 2025 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL May 2025 May 2026 32,451 1.32 Y 2026 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL May 2026 May 2027 37,342 1.40 Y 2027 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Mar 2028 33,319 1.42 Y LI 4582E34000 - Grenades, All Types Army Location of PCO Item Number / Title [DODIC]: E69300 / GRENADE, Hand, Smoke, White, M83 [G982] UNCLASSIFIED Page 47 of 47 P-1 Line #26 (Each) RFP Issue Date Volume 1 - 702 === page 735 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 22.758 36.846 44.927 - 44.927 42.408 49.155 49.267 49.826 - 762.030 762.030 762.030 To FY 2031 Complete - - - - - - - - - - 22.758 36.846 44.927 - 44.927 42.408 49.155 49.267 49.826 - - - - - - - - - - - 22.758 36.846 44.927 - 44.927 42.408 49.155 49.267 49.826 - Total 1,057.217 1,057.217 1,057.217 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line includes Signals, All Types. (E46400) Signal, Hand Held Red Star Cluster M158 The Family of Hand Held Signals are individually launched pyrotechnics used for signaling and illumination. The payload is launched by a small, fin stabilized rocket and reaches a height of 725 feet. M158 is a red star cluster signal used primarily for signaling and illuminating missions. The payload is a cluster of five flares that burn for approximately 10 seconds. This item is Code A, approved for service use. (E46500) Signal, Hand Held White Star Cluster M159 The Family of Hand Held Signals are individually launched pyrotechnics used for signaling and illumination. The payload is launched by a small, fin stabilized rocket and reaches a height of 725 feet. M159 is a white star cluster signal used primarily for signaling and illuminating missions. The payload is a cluster of five flares that burn for approximately 10 seconds. This item is Code A, approved for service use. E46700 / Signal, Hand Held Red Parachute Flare M126A1 [LA80] The M126A1 is a red parachute flare used for nighttime illumination, surface-to-air, and surface -to-ground signaling. The payload is launched by a small fin stabilized rocket and reaches a height of 725 feet. The flare burns for approximately 50 seconds. This is a Code A, approved for service use. (E46800) Signal, Hand Held White Parachute Flare M127A1 The Family of Hand Held Signals are individually launched pyrotechnics used for signaling and illumination. The payload is launched by a small, fin stabilized rocket and reaches a height of 725 feet. The M127A1 is a white parachute flare used primarily for nighttime battlefield illumination, surface-to-air & surface-to-ground signaling. The flare burns for approximately 50 seconds. This item is Code A, approved for service use. (E47000) Signal, Hand Held Green Star Cluster M125A1 The Family of Hand Held Signals are individually launched pyrotechnics used for signaling and illumination. The payload is launched by a small, fin stabilized rocket and reaches a height of 725 feet. M125A1 is a green star cluster signal used for signaling and illuminating missions. The payload is a cluster of five flares that burn for approximately 10 seconds. This item is Code A, approved for service use. (E48300) Signal, Hand Held Green Parachute Flare M195 LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 1 of 45 P-1 Line #27 Volume 1 - 703 === page 736 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A The M126A1 is a green parachute flare used for nighttime illumination, surface-to-air, and surface -to-ground signaling. The payload is launched by a small fin stabilized rocket and reaches a height of 725 feet. The flare burns for approximately 50 seconds. This is a Code A, approved for service use. (E49100) Flare, AC Countermeasure, M206 Magnesium Teflon IR The M206 flare is part of the family of advance Infrared Countermeasure flares/decoys designed to protect Army helicopters and fixed wing aircraft against infrared seeking missile threats. The M206 flare is in a 1"x1"x8" form factor in an aluminum case. The flare consists of magnesium, Teflon, Viton (MTV) composition that is wrapped in an aluminum filament and inserted into the aluminum case that is then closed with a felt spacer and sealed with a plastic end cap. The M206 composition is ignited and expelled by the BBU-35B/M796 impulse cartridge from the Common Missile Warning System (CMWS). This is a Code A, approved for service use. (E49101) Flare, Aircraft Countermeasure, RF (Passive) XM20 The XM20 is a next generation Radio Frequency (RF) expendable countermeasure that provides effective coverage against current and advanced Surface-to-Air missiles (SAM), and advance guided missiles in the RF frequency bands. This is a Code B, not approved for service use pending type classification (E49102) Flare, Aircraft Countermeasures, XM215 The XM215 is a next generation Infrared (IR) expendable countermeasure that provides effective coverage against current and. advanced Man-Portable Air-Defense Systems (MANPADS) and advance guided missiles in the muti-electro optical bands. This is a Code B, not approved for service use pending type classification (E62900) SMOKE POT PRACTICE M8 The M8 Floating Practice Smoke Pot is a five-gallon metal pail containing roughly 25 pounds of environmentally acceptable smoke mixture. It is initiated by a pyrotechnic delay igniting fuse. After ignition and roughly 8 to 12 second fuze delay, dense smoke cloud is produced for screening purposes to conceal troop, vehicle, or other march movements, particularly at river crossings. It is deployed in a similar manner as the M4 and M5 series service smoke pot. It is used by the individual Soldier in squad, company and battalion units. This item is Code A, approved for service use. (E88900) Flare AC Countermeasure M211 Pyrophoric Msl IR Decoy The M211 decoy is part of the family of advance Infrared Countermeasure flares/decoys designed to protect Army helicopters and fixed wing aircraft against infrared seeking missile threats. The M211 decoy is in a 1"x1"x8" form factor in an aluminum case. The decoy consists of a piston, special material payload foils that are inserted into the aluminum case and sealed with a metal end cap. The special material is pyrophoric iron that reacts with oxygen when exposed to air when expelled by the BBU-35B/M796 impulse cartridge from the Common Missile Warning System (CMWS). This is a Code A, approved for service use. LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 2 of 45 P-1 Line #27 Volume 1 - 704 === page 737 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 E46400 / Signal, Hand Held Red Star Cluster M158 P-5a A - / 39.419 / 5.233 - / 0.850 - / 0.807 - / - - / 0.807 P-5 E46500 / Signal, Hand Held White Star Cluster M159 [L307] P-5a A - / 36.211 - / - - / 1.674 - / 1.727 - / - - / 1.727 P-5 E46700 / Signal, Hand Held Red Parachute Flare M126A1 [LA80] P-5a, P-21 A - / 27.115 - / - - / 7.616 - / 7.568 - / - - / 7.568 P-5 E46800 / Signal, Hand Held White Parachute Flare M127A1 [L312] P-5a A - / 149.942 - / - - / 2.660 - / 2.736 - / - - / 2.736 P-5 E47000 / Signal, Hand Held Green Star Cluster M125A1 [L314] P-5a A - / 63.831 - / - - / 1.897 - / 1.912 - / - - / 1.912 P-5 E48300 / Signal, Hand Held Green Parachute Flare M195 P-5a A - / 17.123 - / - - / 0.945 - / 0.974 - / - - / 0.974 P-5 E49100 / Flare, AC Countermeasure, M206 Magnesium Teflon IR [L410] P-5a, P-21 A / - - / 4.578 - / 6.464 - / - - / 6.464 P-5 E49101 / Flare, Aircraft Countermeasure, RF (Passive) P-5a, P-21 B - / - - / 9.849 - / 2.539 - / 8.649 - / - - P-5 E49102 / Flare, Aircraft Countermeasure, XM215 B - / - - / 0.862 P-5 E62900 / SMOKE POT, Practice, M8 [K511] P-5a A - / 99.220 - / 6.814 P-5 E88900 / Flare AC Cntermeasure M211 Pyrophoric Msl IR Decoy P-5a, P-21 A - / 253.400 P-40 Total Gross/Weapon System Cost - / 762.030 - - / 75.769 - - - / 8.649 / - - / - - / - - - / 6.401 - / - - / - - / - / - - / 7.686 - / 14.090 - / - - / 14.090 / 22.758 - / 36.846 - / 44.927 - / - - / 44.927 / - *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 base budget supports critical Army Title 10 war reserve/operational, training, and test requirements in accordance with DoDI 3000.04 (Munitions Requirements Process) and AR 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War (OSW)-approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life-cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities." FY 2027 Total Base dollars in the amount of $44.927 million supports the procurement of nine variants of signals. (E46400) Signal, Handheld Red Star Cluster M158 This is a training standard item used in both training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $0.807 million supports the procurement of 7,910 signals. TYPE CLASSIFICATION DATE: 1983 (E46500) Signal, Handheld White Star Cluster M159 This is a training standard item used in both training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $1.727 million supports the procurement of 16,927 signals. TYPE CLASSIFICATION DATE: 1999 LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 3 of 45 P-1 Line #27 Volume 1 - 705 === page 738 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A (E46700) Signal, Handheld Red Parachute Flare M126A1 This is a training standard item used in both training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $7.568 million supports the procurement of 68,569 signals. TYPE CLASSIFICATION DATE: 1983 (E46800) Signal, Handheld White Parachute Flare M127A1 This is a training standard item used in both training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $2.736 million supports the procurement of 24,812 signals. TYPE CLASSIFICATION DATE: 1983 (E47000) Signal, Handheld Green Star Cluster M125A1 This is a training standard item used in both training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $1.912 million supports the procurement of 18,741 signals. TYPE CLASSIFICATION DATE: 1983 (E48300) Signal, Handheld Green Parachute Flare M195 This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $0.974 million supports the procurement of 8,702 signals. TYPE CLASSIFICATION DATE: TBD (E49100) Flare, AC Countermeasure, M206 Magnesium Teflon IR (L410) This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 procurement dollars in the amount of $6.464 million supports the procurement of 64,399 signals. . TYPE CLASSIFICATION DATE: TBD (E49101) Flare, Aircraft Countermeasure, RF (Passive), XM20 This is a war reserve item used in combat. FY 2027 request builds a war reserve inventory in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $8.649 million supports the procurement of 34,682 signals. TYPE CLASSIFICATION DATE: TBD (E49102) Flare, Aircraft Countermeasures, XM215 This is a war reserve item used in combat. The request builds a war reserve inventory in accordance with Army's procurement goals. There is no FY 2027 budget request for this item. TYPE CLASSIFICATION DATE: TBD (E62900) Smoke Pot Practice M8 This is a training standard item used in training and combat. The request builds a war reserve inventory in accordance with Army's procurement goals. There is no FY 2027 budget request for this item. TYPE CLASSIFICATION DATE: 1994 (E88900) Flare AC Countermeasure M211 Pyrophoric Msl IR Decoy This is a training standard item used in training and combat. FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 procurement dollars in the amount of $14.090 million supports the procurement of 101,310 signals. LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 4 of 45 P-1 Line #27 Volume 1 - 706 === page 739 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A TYPE CLASSIFICATION DATE: TBD LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 5 of 45 P-1 Line #27 Volume 1 - 707 === page 740 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E46400 / Signal, Hand Held Red Star Cluster M158 MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 39.419 5.233 0.850 0.807 - 0.807 - - - - - - 39.419 5.233 0.850 0.807 - 0.807 - - - - - - 39.419 5.233 0.850 0.807 - 0.807 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, 29.847 86.07 49,553 4.265 86.07 8,270 0.712 86.07 7,910 0.681 - - - 86.07 7,910 0.681 20,318 1.094 58.53 2,086 0.122 59.76 363 0.022 57.57 333 0.019 - - - 57.57 333 0.019 - 30.941 - - 4.387 - - 0.733 - - 0.700 - - - - - 0.700 - - 30.941 - - 4.387 - - 0.733 - - 0.700 - - - - - 0.700 Production Engineering - - 8.338 - - 0.834 - - 0.096 - - 0.107 - - - - - 0.107 Subtotal: Support Production Engineering Cost - - 8.338 - - 0.834 - - 0.096 - - 0.107 - - - - - 0.107 (†) PACK (LAP) BOX METAL M548 (†) 64.93 459,665 53.83 - Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.139 - - 0.012 - - 0.020 - - - - - - - - - Subtotal: Support - Quality Assurance Cost - - 0.139 - - 0.012 - - 0.020 - - - - - - - - - Gross/Weapon System Cost - - 39.419 - - 5.233 - - 0.850 - - 0.807 - - - - - 0.807 Remarks: Production engineering cost fluctuations across FY 2025 to FY 2027 due to changes in planned procurement and reflects the pro-rated share of support costs within the BLIN. (†) indicates the presence of a P-5a LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 6 of 45 P-1 Line #27 Volume 1 - 708 === page 741 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) BOX METAL M548 BOX METAL M548 BOX METAL M548 O O C P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 TO BE SELECTED / TO BE SELECTED C / FFP ROCK ISLAND ARSENAL, IL May 2026 Nov 2027 49,553 86.07 Y 2026 TO BE SELECTED / TO BE SELECTED Option / FFP ROCK ISLAND ARSENAL, IL May 2026 Nov 2027 8,270 86.07 Y 2027 TO BE SELECTED / TO BE SELECTED Option / FFP ROCK ISLAND ARSENAL, IL May 2027 Nov 2028 7,910 86.07 Y 2025 TO BE SELECTED / TO BE SELECTED C / FFP ROCK ISLAND ARSENAL, IL May 2026 May 2027 2,086 58.53 Y 2026 TO BE SELECTED / TO BE SELECTED Option / FFP ROCK ISLAND ARSENAL, IL May 2026 May 2027 363 59.76 Y 2027 TO BE SELECTED / TO BE SELECTED Option / FFP ROCK ISLAND ARSENAL, IL May 2027 May 2028 333 57.57 Y LI 6038E46900 - Signals, All Types Army Location of PCO Item Number / Title [DODIC]: E46400 / Signal, Hand Held Red Star Cluster M158 UNCLASSIFIED Page 7 of 45 P-1 Line #27 (Each) RFP Issue Date Volume 1 - 709 === page 742 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E46500 / Signal, Hand Held White Star Cluster M159 [L307] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 36.211 - 1.674 1.727 - 1.727 - - - - - - 36.211 - 1.674 1.727 - 1.727 - - - - - - 36.211 - 1.674 1.727 - 1.727 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Load, Assemble, Pack 34.752 - - - 86.07 16,738 1.441 86.07 16,927 1.457 - - - 86.07 16,927 1.457 2,955 0.197 - - - 59.76 719 0.043 57.57 712 0.041 - - - 57.57 712 0.041 - 34.950 - - - - - 1.484 - - 1.498 - - - - - 1.498 - - 34.950 - - - - - 1.484 - - 1.498 - - - - - 1.498 Production Engineering - - 1.255 - - - - - 0.190 - - 0.229 - - - - - 0.229 Subtotal: Support Production Engineering Cost - - 1.255 - - - - - 0.190 - - 0.229 - - - - - 0.229 (Lap) (†) Box Metal M548 (†) 610.29 56,944 66.80 - Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.007 - - - - - - - - - - - - - - - Subtotal: Support - Quality Assurance Cost - - 0.007 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 36.211 - - - - - 1.674 - - 1.727 - - - - - 1.727 Remarks: Production engineering cost fluctuations across FY 2025 to FY 2027 due to changes in planned procurement and reflects the pro-rated share of support costs within the BLIN. (†) indicates the presence of a P-5a LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 8 of 45 P-1 Line #27 Volume 1 - 710 === page 743 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements Load, Assemble, Pack (Lap) Load, Assemble, Pack (Lap) Box Metal M548 Box Metal M548 O O C P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 TO BE SELECTED / TO BE SELECTED C / FFP ROCK ISLAND ARSENAL, IL May 2026 Nov 2027 16,738 86.07 Y 2027 TO BE SELECTED / TO BE SELECTED Option / FFP ROCK ISLAND ARSENAL, IL May 2027 Nov 2028 16,927 86.07 Y 2026 TO BE SELECTED / TO BE SELECTED C / FFP ROCK ISLAND ARSENAL, IL May 2026 May 2027 719 59.76 Y 2027 TO BE SELECTED / TO BE SELECTED Option / FFP ROCK ISLAND ARSENAL, IL May 2027 May 2028 712 57.57 Y LI 6038E46900 - Signals, All Types Army Location of PCO Item Number / Title [DODIC]: E46500 / Signal, Hand Held White Star Cluster M159 [L307] UNCLASSIFIED Page 9 of 45 P-1 Line #27 (Each) RFP Issue Date Volume 1 - 711 === page 744 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E46700 / Signal, Hand Held Red Parachute Flare M126A1 [LA80] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 27.115 - 7.616 7.568 - 7.568 - - - - - - 27.115 - 7.616 7.568 - 7.568 - - - - - - 27.115 - 7.616 7.568 - 7.568 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Load, Assemble, Pack 25.901 - - - 91.74 71,886 6.595 93.59 68,569 6.417 - - - 93.59 68,569 6.417 2,354 0.384 - - - 59.76 3,026 0.181 57.57 2,886 0.166 - - - 57.57 2,886 0.166 - 26.285 - - - - - 6.776 - - 6.584 - - - - - 6.584 - - 26.285 - - - - - 6.776 - - 6.584 - - - - - 6.584 Production Engineering - - 0.830 - - - - - 0.840 - - 0.978 - - - - - 0.978 Subtotal: Support Production Engineering Cost - - 0.830 - - - - - 0.840 - - 0.978 - - - - - 0.978 (Lap) (†) Box Metal M548 (†) 463.15 55,924 163.00 - Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - - - - - - - - - - 0.007 - - - - - 0.007 Subtotal: Support - Quality Assurance Cost - - - - - - - - - - - 0.007 - - - - - 0.007 Gross/Weapon System Cost - - 27.115 - - - - - 7.616 - - 7.568 - - - - - 7.568 Remarks: Unit cost increase across FY 2026 to FY 2027 is based on current government estimate pricing matrix. New contract award in FY 2026. Production engineering cost fluctuations across FY 2025 to FY 2027 due to changes in planned procurement and reflects the pro-rated share of support costs within the BLIN. LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 10 of 45 P-1 Line #27 Volume 1 - 712 === page 745 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 P-1 Line Item Number / Title: 6038E46900 / Signals, All Types ID Code (A=Service Ready, B=Not Service Ready) : A (†) Item Number / Title [DODIC]: E46700 / Signal, Hand Held Red Parachute Flare M126A1 [LA80] MDAP/MAIS Code: indicates the presence of a P-5a LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 11 of 45 P-1 Line #27 Volume 1 - 713 === page 746 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 O O C Cost Elements (†) Load, Assemble, Pack (Lap) (†) Load, Assemble, Pack (Lap) Box Metal M548 Box Metal M548 (†) P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E46700 / Signal, Hand Held Red Parachute Flare M126A1 [LA80] Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 TO BE SELECTED / TO BE SELECTED C / FFP ROCK ISLAND ARSENAL, IL May 2026 Nov 2027 71,886 91.74 N 2027 TO BE SELECTED / TO BE SELECTED Option / FFP ROCK ISLAND ARSENAL, IL May 2027 Nov 2028 68,569 93.59 Y 2026 TO BE SELECTED / TO BE SELECTED C / FFP ROCK ISLAND ARSENAL, IL May 2026 Jan 2027 3,026 59.76 Y 2027 TO BE SELECTED / TO BE SELECTED Option / FFP ROCK ISLAND ARSENAL, IL May 2027 Jan 2028 2,886 57.57 Y (Each) RFP Issue Date indicates the presence of a P-21 LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 12 of 45 P-1 Line #27 Volume 1 - 714 === page 747 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE Item Number / Title [DODIC]: E46700 / Signal, Hand Held Red Parachute Flare M126A1 [LA80] Fiscal Year 2026 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Load, Assemble, Pack (Lap) Prior Years Deliveries: 55924 1 2026 ARMY 71.886 .000 71.886 1 2027 ARMY 68.569 .000 68.569 A O C T LI 6038E46900 - Signals, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 45 S E P O C T N O V D E C J A N F E B P-1 Line #27 M A R A P R - - - - - 71.886 A - - - - - 68.569 M A Y J U N J U L A U G S E P Volume 1 - 715 === page 748 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE Item Number / Title [DODIC]: E46700 / Signal, Hand Held Red Parachute Flare M126A1 [LA80] N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 5.715 5.714 5.714 5.714 5.714 5.714 5.714 5.714 5.714 5.714 5.714 5.714 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Fiscal Year 2028 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T Load, Assemble, Pack (Lap) Prior Years Deliveries: 55924 1 2026 ARMY 71.886 .000 71.886 - 5.996 5.990 5.990 5.990 5.990 5.990 5.990 5.990 5.990 5.990 5.990 5.990 1 2027 ARMY 68.569 .000 68.569 - - - - - - - - - - - - - O C T LI 6038E46900 - Signals, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 45 S E P O C T .000 P-1 Line #27 Volume 1 - 716 === page 749 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E46700 / Signal, Hand Held Red Parachute Flare M126A1 [LA80] Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Load, Assemble, Pack (Lap) Prior Years Deliveries: 55924 1 2026 ARMY 71.886 71.886 .000 1 2027 ARMY 68.569 62.855 5.714 .000 5.714 O C T LI 6038E46900 - Signals, All Types Army .000 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 45 S E P O C T N O V D E C J A N F E B P-1 Line #27 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 717 === page 750 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Item Number / Title [DODIC]: E46700 / Signal, Hand Held Red Parachute Flare M126A1 [LA80] Production Rates (Each / Month) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 TO BE SELECTED - TO BE SELECTED MSR For 2027 1-8-5 For 2027 MAX For 2027 5,000 32,000 64,000 ALT Prior to Oct 1 ALT After Oct 1 8 Reorder Manufacturing PLT 8 18 Total After Oct 1 ALT Prior to Oct 1 26 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 15 21 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 16 of 45 P-1 Line #27 Volume 1 - 718 === page 751 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E46800 / Signal, Hand Held White Parachute Flare M127A1 [L312] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) 149.942 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 149.942 Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) 149.942 FY 2027 Base FY 2027 OOC - - - - FY 2027 Total - - 2.660 2.736 - 2.736 - - - - - - 2.660 2.736 - 2.736 - - - - - - 2.660 2.736 - 2.736 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years FY 2025 FY 2026 (Each) 1,220.88 121,037 147.772 - - - 91.74 24,977 2.291 93.59 24,812 2.322 - - - 93.59 24,812 2.322 81.97 5,096 0.418 - - - 59.76 1,051 0.063 57.57 1,044 0.060 - - - 57.57 1,044 0.060 - - 148.189 - - - - - 2.354 - - 2.382 - - - - - 2.382 - - 148.189 - - - - - 2.354 - - 2.382 - - - - - 2.382 Production Engineering - - 1.725 - - - - - 0.293 - - 0.354 - - - - - 0.354 Subtotal: Support Production Engineering Cost - - 1.725 - - - - - 0.293 - - 0.354 - - - - - 0.354 ($ M) ($) Qty (Each) Unit Cost ($ M) ($) Qty (Each) ($ M) Unit Cost ($) Total Cost FY 2027 Total ($) Cost Elements Unit Cost Total Cost FY 2027 OOC Qty Unit Cost Total Cost FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Load, Assemble, Pack (Lap) (†) Box Metal M548 (†) Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.027 - - - - - 0.013 - - - - - - - - - Subtotal: Support - Quality Assurance Cost - - 0.027 - - - - - 0.013 - - - - - - - - - Gross/Weapon System Cost - - 149.942 - - - - - 2.660 - - 2.736 - - - - - 2.736 Remarks: Unit cost increase across FY 2026 to FY 2027 is based on current government estimate pricing matrix. New contract award in FY 2026. Production engineering cost fluctuations across FY 2025 to FY 2027 due to changes in planned procurement and reflects the pro-rated share of support costs within the BLIN. LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 17 of 45 P-1 Line #27 Volume 1 - 719 === page 752 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 P-1 Line Item Number / Title: 6038E46900 / Signals, All Types ID Code (A=Service Ready, B=Not Service Ready) : A (†) Item Number / Title [DODIC]: E46800 / Signal, Hand Held White Parachute Flare M127A1 [L312] MDAP/MAIS Code: indicates the presence of a P-5a LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 18 of 45 P-1 Line #27 Volume 1 - 720 === page 753 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements Load, Assemble, Pack (Lap) Load, Assemble, Pack (Lap) Box Metal M548 Box Metal M548 O O C P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 TO BE SELECTED / TO BE SELECTED C / FFP ROCK ISLAND ARSENAL, IL May 2026 Nov 2027 24,977 91.74 Y 2027 TO BE SELECTED / TO BE SELECTED Option / FFP ROCK ISLAND ARSENAL, IL May 2027 Nov 2028 24,812 93.59 Y 2026 TO BE SELECTED / TO BE SELECTED C / FFP ROCK ISLAND ARSENAL, IL May 2026 May 2027 1,051 59.76 Y 2027 TO BE SELECTED / TO BE SELECTED Option / FFP ROCK ISLAND ARSENAL, IL May 2027 May 2028 1,044 57.57 Y LI 6038E46900 - Signals, All Types Army Location of PCO Item Number / Title [DODIC]: E46800 / Signal, Hand Held White Parachute Flare M127A1 [L312] UNCLASSIFIED Page 19 of 45 P-1 Line #27 (Each) RFP Issue Date Volume 1 - 721 === page 754 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E47000 / Signal, Hand Held Green Star Cluster M125A1 [L314] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 63.831 - 1.897 1.912 - 1.912 - - - - - - 63.831 - 1.897 1.912 - 1.912 - - - - - - 63.831 - 1.897 1.912 - 1.912 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost FY 2025 Total Cost Qty ($) (Each) ($ M) 317.05 193,981 49.43 - Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Load, Assemble, Pack 61.501 - - - 84.36 19,355 1.633 86.07 18,741 1.613 - - - 86.07 18,741 1.613 7,518 0.372 - - - 59.76 814 0.049 57.57 788 0.045 - - - 57.57 788 0.045 - 61.872 - - - - - 1.681 - - 1.658 - - - - - 1.658 - - 61.872 - - - - - 1.681 - - 1.658 - - - - - 1.658 Production Engineering - - 1.933 - - - - - 0.215 - - 0.254 - - - - - 0.254 Subtotal: Support Production Engineering Cost - - 1.933 - - - - - 0.215 - - 0.254 - - - - - 0.254 (Lap) (†) Box Metal M548 (†) Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.026 - - - - - - - - - - - - - - - Subtotal: Support - Quality Assurance Cost - - 0.026 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 63.831 - - - - - 1.897 - - 1.912 - - - - - 1.912 Remarks: FY 2026 to FY 2027 unit cost increase due to current government estimate pricing matrix. New contract award in FY 2026. Production engineering cost fluctuations across FY 2025 to FY 2027 due to changes in planned procurement and reflects the pro-rated share of support costs within the BLIN. LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 20 of 45 P-1 Line #27 Volume 1 - 722 === page 755 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 P-1 Line Item Number / Title: 6038E46900 / Signals, All Types ID Code (A=Service Ready, B=Not Service Ready) : A (†) Item Number / Title [DODIC]: E47000 / Signal, Hand Held Green Star Cluster M125A1 [L314] MDAP/MAIS Code: indicates the presence of a P-5a LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 21 of 45 P-1 Line #27 Volume 1 - 723 === page 756 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements Load, Assemble, Pack (Lap) Load, Assemble, Pack (Lap) Box Metal M548 Box Metal M548 O O C P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 TO BE SELECTED / TO BE SELECTED C / FFP ROCK ISLAND ARSENAL, IL May 2026 Nov 2027 19,355 84.36 Y 2027 TO BE SELECTED / TO BE SELECTED Option / FFP ROCK ISLAND ARSENAL, IL May 2027 Nov 2028 18,741 86.07 Y 2026 TO BE SELECTED / TO BE SELECTED C / FFP ROCK ISLAND ARSENAL, IL May 2026 May 2027 814 59.76 Y 2027 TO BE SELECTED / TO BE SELECTED Option / FFP ROCK ISLAND ARSENAL, IL May 2027 May 2028 788 57.57 Y LI 6038E46900 - Signals, All Types Army Location of PCO Item Number / Title [DODIC]: E47000 / Signal, Hand Held Green Star Cluster M125A1 [L314] UNCLASSIFIED Page 22 of 45 P-1 Line #27 (Each) RFP Issue Date Volume 1 - 724 === page 757 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E48300 / Signal, Hand Held Green Parachute Flare M195 MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 17.123 - 0.945 0.974 - 0.974 - - - - - - 17.123 - 0.945 0.974 - 0.974 - - - - - - 17.123 - 0.945 0.974 - 0.974 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements FY 2025 Total Cost Qty ($) (Each) 100.75 134,501 Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, (†) PACK (LAP) 13.551 - - - 91.74 8,919 0.818 93.59 8,702 0.814 - - - 93.59 8,702 0.814 (†) - - - - - - 59.76 375 0.022 57.57 366 0.021 - - - 57.57 366 0.021 Subtotal: Recurring Cost - - 13.551 - - - - - 0.841 - - 0.835 - - - - - 0.835 - - 13.551 - - - - - 0.841 - - 0.835 - - - - - 0.835 Production Engineering - - 3.572 - - - - - 0.104 - - 0.125 - - - - - 0.125 Subtotal: Support Production Engineering Cost - - 3.572 - - - - - 0.104 - - 0.125 - - - - - 0.125 BOX METAL M548 Subtotal: Hardware Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - - - - - - - - - - 0.013 - - - - - 0.013 Subtotal: Support - Quality Assurance Cost - - - - - - - - - - - 0.013 - - - - - 0.013 Gross/Weapon System Cost - - 17.123 - - - - - 0.945 - - 0.974 - - - - - 0.974 Remarks: FY 2026 to FY 2027 unit cost increase due to current government estimate pricing matrix. New contract award in FY 2026. Production engineering cost fluctuations across FY 2025 to FY 2027 due to changes in planned procurement and reflects the pro-rated share of support costs within the BLIN. LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 23 of 45 P-1 Line #27 Volume 1 - 725 === page 758 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 P-1 Line Item Number / Title: 6038E46900 / Signals, All Types ID Code (A=Service Ready, B=Not Service Ready) : A (†) Item Number / Title [DODIC]: E48300 / Signal, Hand Held Green Parachute Flare M195 MDAP/MAIS Code: indicates the presence of a P-5a LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 24 of 45 P-1 Line #27 Volume 1 - 726 === page 759 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) BOX METAL M548 BOX METAL M548 O O C P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 TO BE SELECTED / TO BE SELECTED C / FFP ROCK ISLAND ARSENAL, IL May 2026 Nov 2027 8,919 91.74 N 2027 TO BE SELECTED / TO BE SELECTED Option / FFP ROCK ISLAND ARSENAL, IL May 2027 Nov 2028 8,702 93.59 Y 2026 TO BE SELECTED / TO BE SELECTED C / FFP ROCK ISLAND ARSENAL, IL May 2026 May 2026 375 59.76 Y 2027 TO BE SELECTED / TO BE SELECTED Option / FFP ROCK ISLAND ARSENAL, IL May 2027 May 2028 366 57.57 Y LI 6038E46900 - Signals, All Types Army Location of PCO Item Number / Title [DODIC]: E48300 / Signal, Hand Held Green Parachute Flare M195 UNCLASSIFIED Page 25 of 45 P-1 Line #27 (Each) RFP Issue Date Volume 1 - 727 === page 760 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E49100 / Flare, AC Countermeasure, M206 Magnesium Teflon IR [L410] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 75.769 - 4.578 6.464 - 6.464 - - - - - - 75.769 - 4.578 6.464 - 6.464 - - - - - - 75.769 - 4.578 6.464 - 6.464 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE 28,834 74.890 - - - 84.42 48,469 4.092 84.42 64,399 5.437 - - - 84.42 64,399 5.437 - - 74.890 - - - - - 4.092 - - 5.437 - - - - - 5.437 - - 74.890 - - - - - 4.092 - - 5.437 - - - - - 5.437 Production Engineering - - 0.869 - - - - - 0.486 - - 1.014 - - - - - 1.014 Subtotal: Support Production Engineering Cost - - 0.869 - - - - - 0.486 - - 1.014 - - - - - 1.014 ROUND (†) 2,597.28 Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.010 - - - - - - - - 0.013 - - - - - 0.013 Subtotal: Support - Quality Assurance Cost - - 0.010 - - - - - - - - 0.013 - - - - - 0.013 Gross/Weapon System Cost - - 75.769 - - - - - 4.578 - - 6.464 - - - - - 6.464 Remarks: FY 2026 to FY 2027 funding increase to maintain training and depot level requirements for program. Production engineering cost fluctuations from FY 2026 to FY 2027 due to changes in planned procurement and reflects the pro-rated share of support costs within the BLIN. LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 26 of 45 P-1 Line #27 Volume 1 - 728 === page 761 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 P-1 Line Item Number / Title: 6038E46900 / Signals, All Types ID Code (A=Service Ready, B=Not Service Ready) : A (†) Item Number / Title [DODIC]: E49100 / Flare, AC Countermeasure, M206 Magnesium Teflon IR [L410] MDAP/MAIS Code: indicates the presence of a P-5a LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 27 of 45 P-1 Line #27 Volume 1 - 729 === page 762 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E49100 / Flare, AC Countermeasure, M206 Magnesium Teflon IR [L410] Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 ARMTEC COUNTERMEASURES / COACHELLA, CA Option / FFP ROCK ISLAND ARSENAL, IL Oct 2026 Jan 2028 48,469 84.42 N 2027 ARMTEC COUNTERMEASURES / COACHELLA, CA Option / FFP ROCK ISLAND ARSENAL, IL May 2027 Aug 2028 64,399 84.42 N (Each) RFP Issue Date indicates the presence of a P-21 LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 28 of 45 P-1 Line #27 Volume 1 - 730 === page 763 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE Item Number / Title [DODIC]: E49100 / Flare, AC Countermeasure, M206 Magnesium Teflon IR [L410] Fiscal Year 2027 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT O C T A - Fiscal Year 2028 Calendar Year 2027 N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND Prior Years Deliveries: 28834 1 2026 ARMY 48.469 .000 48.469 1 2027 ARMY 64.399 .000 64.399 O C T LI 6038E46900 - Signals, All Types Army N O V D E C J A N F E B M A R A P R - - - - - - - - 4.039 4.039 4.039 4.039 4.039 4.039 4.039 4.039 4.039 12.118 A - - - - - - - - - - - - - - - 5.367 5.367 53.665 A U G S E P M A Y J U N J U L A U G UNCLASSIFIED Page 29 of 45 S E P O C T N O V D E C J A N F E B P-1 Line #27 M A R A P R M A Y J U N J U L Volume 1 - 731 === page 764 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE Item Number / Title [DODIC]: E49100 / Flare, AC Countermeasure, M206 Magnesium Teflon IR [L410] Fiscal Year 2029 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT O C T N O V D E C Fiscal Year 2030 Calendar Year 2029 J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE ROUND Prior Years Deliveries: 28834 1 2026 ARMY 48.469 36.351 12.118 4.039 4.039 4.040 1 2027 ARMY 64.399 10.734 53.665 5.367 5.367 5.367 5.367 5.367 5.366 5.366 5.366 5.366 5.366 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L LI 6038E46900 - Signals, All Types Army .000 .000 A U G UNCLASSIFIED Page 30 of 45 S E P O C T N O V D E C J A N F E B P-1 Line #27 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 732 === page 765 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Item Number / Title [DODIC]: E49100 / Flare, AC Countermeasure, M206 Magnesium Teflon IR [L410] Production Rates (Each / Month) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 ARMTEC COUNTERMEASURES COACHELLA, CA MSR For 2027 1-8-5 For 2027 MAX For 2027 10,000 77,000 168,000 ALT Prior to Oct 1 ALT After Oct 1 8 Reorder Manufacturing PLT 8 15 Total After Oct 1 ALT Prior to Oct 1 23 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 12 18 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 31 of 45 P-1 Line #27 Volume 1 - 733 === page 766 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E49101 / Flare, Aircraft Countermeasure, RF (Passive) MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 9.849 2.539 8.649 - 8.649 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 9.849 2.539 8.649 - 8.649 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 9.849 2.539 8.649 - 8.649 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost (†) - - - 208.52 41,295 8.611 208.52 9,027 1.882 212.69 34,682 7.377 - - - 212.69 34,682 7.377 Subtotal: Recurring Cost - - - - - 8.611 - - 1.882 - - 7.377 - - - - - 7.377 - - - - - 8.611 - - 1.882 - - 7.377 - - - - - 7.377 COMPLETE FLARE Subtotal: Hardware Cost Support - Production Engineering Cost Production Engineering - - - - - 1.238 - - 0.657 - - 1.272 - - - - - 1.272 Subtotal: Support Production Engineering Cost - - - - - 1.238 - - 0.657 - - 1.272 - - - - - 1.272 Gross/Weapon System Cost - - - - - 9.849 - - 2.539 - - 8.649 - - - - - 8.649 Remarks: FY 2026 to FY 2027 unit cost increase due to current government estimate pricing matrix. Production engineering cost fluctuations from FY 2026 to FY 2027 due to changes in planned procurement and reflects the pro-rated share of support costs within the BLIN. (†) indicates the presence of a P-5a LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 32 of 45 P-1 Line #27 Volume 1 - 734 === page 767 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements (†) COMPLETE FLARE (†) COMPLETE FLARE (†) COMPLETE FLARE (†) O O C P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E49101 / Flare, Aircraft Countermeasure, RF (Passive) Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 TO BE SELECTED / TO BE SELECTED TBD PICATINNY ARSENAL, NJ May 2026 Nov 2027 41,295 208.52 Y 2026 TO BE SELECTED / TO BE SELECTED TBD PICATINNY ARSENAL, NJ May 2026 Nov 2027 9,027 208.52 Y 2027 TO BE SELECTED / TO BE SELECTED TBD PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 34,682 212.69 Y (Each) RFP Issue Date indicates the presence of a P-21 LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 33 of 45 P-1 Line #27 Volume 1 - 735 === page 768 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE Item Number / Title [DODIC]: E49101 / Flare, Aircraft Countermeasure, RF (Passive) Fiscal Year 2026 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE FLARE 1 2025 ARMY 41.295 .000 41.295 A - - - - - - - - - - - - - - - - - 1 2026 ARMY 9.027 .000 A - - - - - - - - - - - - - - - - - 9.027 1 2027 ARMY 34.682 .000 34.682 A - - - - - - - 34.682 9.027 O C T LI 6038E46900 - Signals, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 34 of 45 S E P O C T N O V D E C J A N F E B P-1 Line #27 M A R A P R M A Y J U N J U L A U G 41.295 S E P Volume 1 - 736 === page 769 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE Item Number / Title [DODIC]: E49101 / Flare, Aircraft Countermeasure, RF (Passive) Fiscal Year 2028 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T Calendar Year 2029 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE FLARE 1 2025 ARMY 41.295 .000 41.295 - 3.444 3.441 3.441 3.441 3.441 3.441 3.441 3.441 3.441 3.441 3.441 3.441 .000 1 2026 ARMY 9.027 .000 9.027 - .755 .752 .752 .752 .752 .752 .752 .752 .752 .752 .752 .752 .000 1 2027 ARMY 34.682 .000 34.682 - - - - - - - - - - - O C T LI 6038E46900 - Signals, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 35 of 45 11.562 11.560 11.560 S E P O C T N O V .000 D E C J A N F E B P-1 Line #27 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 737 === page 770 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Item Number / Title [DODIC]: E49101 / Flare, Aircraft Countermeasure, RF (Passive) Production Rates (Each / Month) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 TO BE SELECTED - TO BE SELECTED MSR For 2027 1-8-5 For 2027 MAX For 2027 10,000 20,000 40,000 ALT Prior to Oct 1 ALT After Oct 1 8 Reorder Manufacturing PLT 6 18 Total After Oct 1 ALT Prior to Oct 1 24 ALT After Oct 1 8 Manufacturing PLT 6 Total After Oct 1 15 21 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 36 of 45 P-1 Line #27 Volume 1 - 738 === page 771 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: E49102 / Flare, Aircraft Countermeasure, XM215 MDAP/MAIS Code: FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - - Gross/Weapon System Cost ($ in Millions) - 0.862 - - - - Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.862 - - - - Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.862 - - - - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE FLARE - - - 275.00 2,860 0.787 - - - - - - - - - - - - Subtotal: Recurring Cost - - - - - 0.787 - - - - - - - - - - - - - - - - - 0.787 - - - - - - - - - - - - Subtotal: Hardware Cost Support - Production Engineering Cost Production Engineering - - - - - 0.075 - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - - - - 0.075 - - - - - - - - - - - - Gross/Weapon System Cost - - - - - 0.862 - - - - - - - - - - - - LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 37 of 45 P-1 Line #27 Volume 1 - 739 === page 772 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E62900 / SMOKE POT, Practice, M8 [K511] MDAP/MAIS Code: Resource Summary Prior Years FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - - Gross/Weapon System Cost ($ in Millions) 99.220 6.814 6.401 - - - Less PY Advance Procurement ($ in Millions) - - - - - - 99.220 6.814 6.401 - - - - - - - - - 99.220 6.814 6.401 - - - Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost LOAD, ASSEMBLE, 2,078.27 31,349 65.152 798.49 4,162 3.323 889.42 3,372 2.999 - - - - - - - - - 116.32 20,574 2.393 110.95 4,329 0.480 118.26 3,506 0.415 - - - - - - - - - 104.31 35,943 3.749 121.54 4,787 0.582 112.62 3,877 0.437 - - - - - - - - - 89.99 35,943 3.234 102.33 4,787 0.490 104.63 3,877 0.406 - - - - - - - - - 99.99 35,942 3.594 159.75 4,787 0.765 149.52 3,877 0.580 - - - - - - - - - - - 78.123 - - 5.640 - - 4.836 - - - - - - - - - - - 78.123 - - 5.640 - - 4.836 - - - - - - - - - First Article Test - - 0.218 - - - - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 0.218 - - - - - - - - - - - - - - - - - 0.305 - - - - - - - - - - - - - - - (†) PACK (LAP) FUZE,SMOKE POT, FLOATING M208 (†) INNER COVER ASSEMBLY (†) OUTER COVER ASSEMBLY (†) CONTAINER, USED ON SMOKE POT (†) M8 Subtotal: Recurring Cost Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Product Improvement Cost Production Verification Test LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 38 of 45 P-1 Line #27 Volume 1 - 740 === page 773 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E62900 / SMOKE POT, Practice, M8 [K511] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) Safety FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 0.591 - - - - - - - - - - - - - - - - - 0.896 - - - - - - - - - - - - - - - Production Engineering - - 19.923 - - 1.170 - - 1.565 - - - - - - - - - Subtotal: Support Production Engineering Cost - - 19.923 - - 1.170 - - 1.565 - - - - - - - - - Subtotal: Support - Product Improvement Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.061 - - 0.004 - - - - - - - - - - - - Subtotal: Support - Quality Assurance Cost - - 0.061 - - 0.004 - - - - - - - - - - - - Gross/Weapon System Cost - - 99.220 - - 6.814 - - 6.401 - - - - - - - - - (†) indicates the presence of a P-5a LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 39 of 45 P-1 Line #27 Volume 1 - 741 === page 774 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements O O C P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL May 2025 Jul 2027 4,162 798.49 Y 2026 PINE BLUFF ARSENAL / PINE BLUFF, AR PO ROCK ISLAND ARSENAL, IL May 2026 Jul 2028 3,372 889.42 Y FUZE,SMOKE POT, FLOATING M208 2025 DAY & ZIMMERMANN LONE STAR / TEXARKANA, TX Option / FFP ROCK ISLAND ARSENAL, IL May 2025 Mar 2026 4,329 110.95 Y FUZE,SMOKE POT, FLOATING M208 2026 DAY & ZIMMERMANN LONE STAR / TEXARKANA, TX Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Jan 2027 3,506 118.26 Y 2025 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL May 2025 Feb 2026 4,787 121.54 Y 2026 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL May 2026 Aug 2027 3,877 112.62 Y 2025 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL May 2025 Feb 2026 4,787 102.33 Y 2026 TO BE SELECTED / TBS01 Option / FFP ROCK ISLAND ARSENAL, IL May 2026 Aug 2027 3,877 104.63 Y CONTAINER, USED ON SMOKE POT M8 2025 TOOL MASTERS INC. / TUSCUMBIA, AL Option / FFP ROCK ISLAND ARSENAL, IL May 2025 Feb 2026 4,787 159.75 Y CONTAINER, USED ON SMOKE POT M8 2026 TO BE SELECTED / TBS01 Option / FFP ROCK ISLAND ARSENAL, IL May 2026 Aug 2027 3,877 149.52 Y LOAD, ASSEMBLE, PACK (LAP) LOAD, ASSEMBLE, PACK (LAP) INNER COVER ASSEMBLY INNER COVER ASSEMBLY OUTER COVER ASSEMBLY OUTER COVER ASSEMBLY LI 6038E46900 - Signals, All Types Army Location of PCO Item Number / Title [DODIC]: E62900 / SMOKE POT, Practice, M8 [K511] UNCLASSIFIED Page 40 of 45 P-1 Line #27 (Each) RFP Issue Date Volume 1 - 742 === page 775 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E88900 / Flare AC Cntermeasure M211 Pyrophoric Msl IR Decoy MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) 253.400 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 253.400 Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) 253.400 FY 2027 Base FY 2027 OOC - - - - FY 2027 Total - - 7.686 14.090 - 14.090 - - - - - - 7.686 14.090 - 14.090 - - - - - - 7.686 14.090 - 14.090 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost (†) - - - - - - 120.02 56,572 6.790 123.02 12.463 - - - 123.02 Subtotal: Recurring Cost - - - - - - - - 6.790 - - 12.463 - - - - - 12.463 - - - - - - - - 6.790 - - 12.463 - - - - - 12.463 COMPLETE FLARE Subtotal: Hardware Cost 101,310 101,310 12.463 Support - Production Engineering Cost Production Engineering - - 253.400 - - - - - 0.896 - - 1.627 - - - - - 1.627 Subtotal: Support Production Engineering Cost - - 253.400 - - - - - 0.896 - - 1.627 - - - - - 1.627 Gross/Weapon System Cost - - 253.400 - - - - - 7.686 - - 14.090 - - - - - 14.090 Remarks: FY 2026 to FY 2027 funding increase due to additional procurement of ammunition to meet training and war reserve requirements. (†) indicates the presence of a P-5a LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 41 of 45 P-1 Line #27 Volume 1 - 743 === page 776 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements (†) COMPLETE FLARE (†) COMPLETE FLARE (†) O O C P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E88900 / Flare AC Cntermeasure M211 Pyrophoric Msl IR Decoy Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 TO BE SELECTED / TO BE SELECTED C / FPIF PICATINNY ARSENAL, NJ May 2026 Aug 2027 56,572 120.02 N 2027 TO BE SELECTED / TO BE SELECTED C / FPIF PICATINNY ARSENAL, NJ May 2027 Aug 2028 101,310 123.02 N (Each) RFP Issue Date indicates the presence of a P-21 LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 42 of 45 P-1 Line #27 Volume 1 - 744 === page 777 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE Item Number / Title [DODIC]: E88900 / Flare AC Cntermeasure M211 Pyrophoric Msl IR Decoy Fiscal Year 2026 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE FLARE 1 2026 ARMY 56.572 .000 56.572 1 2027 ARMY 101.310 .000 101.310 A O C T LI 6038E46900 - Signals, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 43 of 45 S E P O C T N O V D E C J A N F E B P-1 Line #27 M A R A P R - - - 4.715 A - - - - M A Y J U N J U L A U G 4.715 47.142 - 101.310 S E P Volume 1 - 745 === page 778 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE Item Number / Title [DODIC]: E88900 / Flare AC Cntermeasure M211 Pyrophoric Msl IR Decoy Fiscal Year 2028 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L 8.443 8.443 8.443 8.443 8.443 8.443 8.442 8.442 8.442 8.442 8.442 8.442 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E COMPLETE FLARE 1 2026 ARMY 56.572 9.430 47.142 4.715 4.715 4.714 4.714 4.714 4.714 4.714 4.714 4.714 4.714 1 2027 ARMY 101.310 .000 101.310 - - - - - - - - - - O C T LI 6038E46900 - Signals, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L .000 UNCLASSIFIED Page 44 of 45 P-1 Line #27 .000 A U G S E P Volume 1 - 746 === page 779 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6038E46900 / Signals, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Item Number / Title [DODIC]: E88900 / Flare AC Cntermeasure M211 Pyrophoric Msl IR Decoy Production Rates (Each / Month) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 TO BE SELECTED - TO BE SELECTED MSR For 2027 1-8-5 For 2027 MAX For 2027 5,000 6,000 80,000 ALT Prior to Oct 1 ALT After Oct 1 8 Reorder Manufacturing PLT 8 15 Total After Oct 1 ALT Prior to Oct 1 23 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 12 18 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 6038E46900 - Signals, All Types Army UNCLASSIFIED Page 45 of 45 P-1 Line #27 Volume 1 - 747 === page 780 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 340.885 340.885 340.885 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 13.735 10.821 11.508 - 11.508 11.878 12.073 12.115 - - - - - - - - 13.735 10.821 11.508 - 11.508 11.878 12.073 12.115 - - - - - - - - 13.735 10.821 11.508 - 11.508 11.878 12.073 12.115 To FY 2031 Complete 12.239 Continuing - Continuing - 12.239 Continuing - Total - Continuing - - 12.239 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line includes Simulators, All Types. (E48413) SIMULATOR, INDOOR WEAPONS FIRE (MICRO) is an indoor weapon effects simulator for booby traps and gunfire. There are multiple shots per item. This item is Code A, approved for service use. (E48415) SIMULATOR, INCOMING ROCKET PROPELLED GRENADE (RPG) simulates a rocket propelled grenade in training environments. The simulator produces rocket smoke trail guided on a wire. This item is Code A, approved for service use. (E48416) SIMULATOR, HIGH ORDER BLAST EFFECT (HIOBE) simulates a high order blast effect or explosion. The simulator creates a reddish-orange ball of flame and airborne debris. This item is Code A, approved for service use. (E48417) SIMULATOR, TARGET KILL, XM175 simulates a destroyed vehicle burning on the battlefield; black smoke with a burn time of 20 seconds. This item is Code A, approved for service use. (E48418) SIMULATOR, SMALL ARMS TRACER FIRE - BACK is designed to simulate the effect from a hostile small arms and crew served weapons fire. This item is Code A, approved for service use. (E49700) SIMULATOR, Projectile Ground Burst, M115A2 is a hand thrown device that is used in training to simulate battlefield noise and effects (shell in flight and ground explosion) during troop maneuvers. The simulator has a 6-10 second delay followed by a 2-4 second whistle ending with a flash and loud report; the surface danger zone is 35 meters. This item is Code A, approved for service use. (E50200) SIMULATOR, Hand Grenade, M116A1 is a hand-thrown device used in Force-on-Force training to simulate battlefield noise and effects of a hand grenade during troop maneuvers. It has a 5 to 10 second delay and a 15- meter surface danger zone. This item is Code A, approved for service use. (E50311) SIMULATOR, CHEM ATTACK, YELLOW SMOKE simulates a nuclear, biological, radiological, or chemical (NBRC) attack on the battlefield; yellow smoke with a burn time of 10 seconds. This item is Code A, approved for service use. LI 8278E51200 - Simulators, All Types Army UNCLASSIFIED Page 1 of 40 P-1 Line #28 Volume 1 - 748 === page 781 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A (E70600) M22 Anti-Tank Weapon Effect Signature Simulator (ATWESS) Guided Missile (GM) Rocket Simulator is used to simulate the TOW, DRAGON or VIPER, including report, flash and smoke through use of an adapter. It is compatible with the Multiple Integrated Laser Engagement System (MILES). This item is Code A, approved for service use. (E88119) SIMULATOR, M34 Hostile Fire Simulator produces a flash and white smoke for simulation of tank gunfire at a distance. The cartridge is fired by the Omega 60 and the BES II launchers during Forceon-Target training scenarios. This item is Code A, approved for service use. (E88125) SIMULATOR, M35 Target Hit, White Star Simulator produces a sound and white star for simulation of a target being hit by tank or artillery fire. The cartridge is fired by the Omega 60 and BES II launchers during Force-on-Target training scenarios. The cartridge produces a bang of 125 +/- 15 dB at a distance of 20 meters, expels about 8-12 burning stars visible at 1800 meters. This item is Code A, approved for service use. (E91114) SIMULATOR, LAUNCHING, ANTITANK GUIDED MISSILE simulates the visible plume of a surface to air missile or shoulder launched rocket; has a visual signature of 1 burning star with white smoke trail which reaches 140 ft. before self-consuming. This item is Code A, approved for service use. (E91116) SIMULATOR, PROJECTILE AIR BURST, EXPLOSIVE: XM181 simulates indirect artillery fire; emits a paper projectile which whistles while ascending to a height of 100 - 150 ft. and has a visual flash and smoke report. This item is Code A, approved for service use. LI 8278E51200 - Simulators, All Types Army UNCLASSIFIED Page 2 of 40 P-1 Line #28 Volume 1 - 749 === page 782 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 E48413 / SIMULATOR, INDOOR WEAPONS FIRE P-5a A - / - - / - P-5 E48414 / SIMULATOR, OUTDOOR WEAPONS FIRE P-5a A - / - - / - P-5 E48415 / SIMULATOR, INCOMING ROCKET PROPELLED GRENADE (RPG) P-5a A - / - - / - P-5 E48416 / SIMULATOR, HIGH ORDER BLAST EFFECT (HIOBE) P-5a A - / - - / - P-5 E48417 / SIMULATOR, TARGET KILL, XM175 P-5a A / 0.742 P-5 E48418 / SIMULATOR, SMALL ARMS TRACER FIRE-BACK P-5a A P-5 E49700 / SIMULATOR, Projectile Ground Burst, M115A2 [L594] P-5a, P-21 A - / 152.105 - / 5.001 P-5 E50200 / SIMULATOR, Hand Grenade, M116A1 [L601] P-5a A - / 111.380 - P-5 E50311 / SIMULATOR, CHEM ATTACK, YELLOW SMOKE P-5a A - / 0.383 P-5 E70600 / SIMULATOR, Rocket, Antitank GM Lnchd, M22 (ATWESS) [LA77] - P-5 E88119 / SIMULATOR, Hostile Fire, M34 P-5a A - P-5 E88125 / SIMULATOR, Target Hit, M35 (White Star) P-5a A - P-5 E91112 / SIMULATOR, PROJECTILE GROUND BURST: MINI BLAST: XM P-5a A P-5 E91114 / SIMULATOR, LAUNCHING, ANTITANK GUIDED MISSILE AND P-5a A P-5 E91116 / SIMULATOR, PROJECTILE AIR BURST, EXPLOSIVE: XM181 P-5a A P-40 Total Gross/Weapon System Cost A - - / 0.129 - / 0.157 - / - - / 0.157 / - - / 0.182 - / - - / 0.182 - / 0.301 - / 0.307 - / - - / 0.307 - / 0.556 - / 0.565 - / - - / 0.565 - / 0.576 - / 0.230 - / - - / 0.230 / - - / 0.405 - / - - / 0.405 - / 5.582 - / 6.103 - / - - / 6.103 / 2.312 - / 1.057 - / 1.214 - / - - / 1.214 - / 0.065 - / 0.046 - / 0.067 - / - - / 0.067 / 60.701 - / 1.249 / - - / - / 7.359 - / 1.969 - / 1.628 - / 1.246 - / - - / 1.246 / 6.465 - / 1.206 - / 0.721 - / 0.803 - / - - / 0.803 / - - / 0.225 - / 0.229 - / - - / 0.229 / - - / - / - - / - / 11.508 - / - / 1.337 - / - - / / 0.560 - - / - - - / 0.891 / 0.595 - / 0.300 / 340.885 - / 13.735 - / - - / - - / / 10.821 - - - / - / / / 11.508 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 base budget supports critical Army Title 10 war reserve/operational, training, and test requirements in accordance with DoDI 3000.04 (Munitions Requirements Process) and AR 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War (OSW)-approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life-cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. FY 2027 Total Base dollars in the amount of $11.508 million supports the procurement of twelve variants of simulators. (E48413) / SIMULATOR, INDOOR WEAPONS FIRE (MICRO) LI 8278E51200 - Simulators, All Types Army UNCLASSIFIED Page 3 of 40 P-1 Line #28 Volume 1 - 750 === page 783 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A This is a training unique item not used in combat. The FY 2027 request supports annual training and builds depot levels in accordance with Army procurement goals. Procurement dollars in the amount of $0.157 million supports the production of 1,801 simulators. TYPE CLASSIFICATION DATE: TBD (E48414) / SIMULATORS, OUTDOOR WEAPONS FIRE This is a training unique item not used in combat. The FY 2027 request supports annual training and builds depot levels in accordance with Army procurement goals. Procurement dollars in the amount of $0.182 million supports the production of 1,266 simulators. E48414 is a new start in FY 2027. TYPE CLASSIFICATION DATE: TBD (E48415) / SIMULATOR, INCOMING ROCKET PROPELLED GRENADE (RPG) XM185 This is a training unique item not used in combat. The FY 2027 request supports annual training and builds depot levels in accordance with Army procurement goals. Procurement dollars in the amount of $0.307 million supports the production of 1,567 simulators. TYPE CLASSIFICATION DATE: SEP 2026 (E48416) / SIMULATOR, HIGH ORDER BLAST EFFECT (HIOBE) This is a training unique item not used in combat. The FY 2027 request supports annual training and builds depot levels in accordance with Army procurement goals. Procurement dollars in the amount of $0.565 million supports the production of 681 simulators. TYPE CLASSIFICATION DATE: SEP 2027 (E48417) / SIMULATOR, TARGET KILL, M175 Black Smoke This is a training unique item not used in combat. FY 2027 request supports annual training and builds a depot level in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $0.230 million supports the production of 7,690 Simulators. TYPE CLASSIFICATION DATE: AUG 2024 (E48418) / SIMULATOR, SMALL ARMS TRACER FIRE - BACK This is a training unique item not used in combat. The FY 2027 request supports annual training and builds depot levels in accordance with Army procurement goals. Procurement dollars in the amount of $0.405 million supports the production of 1,032 simulators. E48418 is a new start in FY 2027. TYPE CLASSIFICATION DATE: TBD (E49700) / SIMULATOR, PROJ GND BURST M115A2 This is a training unique item not used in combat. FY 2027 request supports annual training and builds a depot level in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $6.103 million supports the production of 128,459 Ground Burst Simulators. TYPE CLASSIFICATION DATE: 1962 (E50200) / SIMULATOR, HAND GRENADE M116A1 This is a training unique item not used in combat. FY 2027 request supports annual training and builds a depot level in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $1.214 million supports production of 31,929 M116A1 Simulator Hand Grenades. TYPE CLASSIFICATION DATE: 1960 (E50311) / SIMULATOR, CHEM ATTACK, YELLOW SMOKE This is a training unique item not used in combat. FY 2027 request supports annual training and builds a depot level in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $0.067 million supports production of 1,849 Chem Attack Yellow Smoke Simulators. LI 8278E51200 - Simulators, All Types Army UNCLASSIFIED Page 4 of 40 P-1 Line #28 Volume 1 - 751 === page 784 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A TYPE CLASSIFICATION DATE: AUG 2024 (E70600) / SIMULATOR, Rocket, Antitank GM Lnchd, M22 This is a training unique item not used in combat. The request builds a war reserve inventory in accordance with Army's procurement goals. There is no FY 2027 budget request for this item. TYPE CLASSIFICATION DATE: TBD (E88119) / SIMULATOR, HOSTILE FIRE SIMULATOR M34 This is a training unique item not used in combat. FY 2027 request supports annual training and builds a depot level in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $1.246 million supports production of 43,200 simulators. TYPE CLASSIFICATION DATE: October 2006 (E88125) / SIMULATOR, TARGET HIT (White Star) M35 This is a training unique item not used in combat. FY 2027 request supports annual training and builds a depot level in accordance with Army's procurement goals. FY 2027 Base procurement dollars in the amount of $0.803 million supports production of 46,910 simulators. TYPE CLASSIFICATION DATE: October 2006 (E91112) / SIMULATOR, PROJECTILE GROUND BURST: MINI BLAST XM183 This is a training unique item not used in combat. The FY 2027 request supports annual training and builds depot levels in accordance with Army procurement goals. Procurement dollars in the amount of $0.229 million supports the production of 2,849 simulators. TYPE CLASSIFICATION DATE: JULY 2025 (E91114) / SIMULATOR, LAUNCHING, ANTITANK GUIDED MISSILE This is a training unique item not used in combat. The request builds a war reserve inventory in accordance with Army's procurement goals. There is no FY 2027 budget request for this item. TYPE CLASSIFICATION DATE: OCTOBER 2022 (E91116) / SIMULATOR, PROJECTILE AIR BURST, EXPLOSIVE: XM181 This is a training unique item not used in combat. The request builds a war reserve inventory in accordance with Army's procurement goals. There is no FY 2027 budget request for this item. TYPE CLASSIFICATION DATE: OCTOBER 2022 LI 8278E51200 - Simulators, All Types Army UNCLASSIFIED Page 5 of 40 P-1 Line #28 Volume 1 - 752 === page 785 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E48413 / SIMULATOR, INDOOR WEAPONS FIRE MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - 0.129 0.157 - 0.157 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - 0.129 0.157 - 0.157 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - 0.129 0.157 - 0.157 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) - - - - - - 32.83 585 0.019 33.41 1,801 0.060 - - - 33.41 1,801 0.060 Subtotal: Recurring Cost - - - - - - - - 0.019 - - 0.060 - - - - - 0.060 - - - - - - - - 0.019 - - 0.060 - - - - - 0.060 ROUND Subtotal: Hardware Cost Support - Production Engineering Cost Production Engineering - - - - - - - - 0.110 - - 0.097 - - - - - 0.097 Subtotal: Support Production Engineering Cost - - - - - - - - 0.110 - - 0.097 - - - - - 0.097 Gross/Weapon System Cost - - - - - - - - 0.129 - - 0.157 - - - - - 0.157 (†) indicates the presence of a P-5a LI 8278E51200 - Simulators, All Types Army UNCLASSIFIED Page 6 of 40 P-1 Line #28 Volume 1 - 753 === page 786 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 TO BE SELECTED / TO BE SELECTED TBD PICATINNY ARSENAL, NJ May 2026 Nov 2027 585 32.83 N 2027 TO BE SELECTED / TO BE SELECTED TBD PICATINNY ARSENAL, NJ Mar 2027 Jun 2028 1,801 33.41 Y LI 8278E51200 - Simulators, All Types Army Location of PCO Item Number / Title [DODIC]: E48413 / SIMULATOR, INDOOR WEAPONS FIRE UNCLASSIFIED Page 7 of 40 P-1 Line #28 (Each) RFP Issue Date Volume 1 - 754 === page 787 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E48414 / SIMULATOR, OUTDOOR WEAPONS FIRE MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - - 0.182 - 0.182 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - - 0.182 - 0.182 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - - 0.182 - 0.182 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) - - - - - - - - - 55.02 1,266 0.070 - - - 55.02 1,266 0.070 Subtotal: Recurring Cost - - - - - - - - - - - 0.070 - - - - - 0.070 - - - - - - - - - - - 0.070 - - - - - 0.070 ROUND Subtotal: Hardware Cost Support - Production Engineering Cost Production Engineering - - - - - - - - - - - 0.112 - - - - - 0.112 Subtotal: Support Production Engineering Cost - - - - - - - - - - - 0.112 - - - - - 0.112 Gross/Weapon System Cost - - - - - - - - - - - 0.182 - - - - - 0.182 (†) indicates the presence of a P-5a LI 8278E51200 - Simulators, All Types Army UNCLASSIFIED Page 8 of 40 P-1 Line #28 Volume 1 - 755 === page 788 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements COMPLETE ROUND O O C FY Contractor and Location 2027 TO BE SELECTED / TO BE SELECTED LI 8278E51200 - Simulators, All Types Army P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Method/Type or Funding Vehicle TBD Location of PCO PICATINNY ARSENAL, NJ UNCLASSIFIED Page 9 of 40 Item Number / Title [DODIC]: E48414 / SIMULATOR, OUTDOOR WEAPONS FIRE Award Date Date of First Delivery Mar 2027 Sep 2028 P-1 Line #28 Qty (Each) 1,266 Specs Date Unit Cost Avail Revision Now? Available ($) 55.02 RFP Issue Date Y Volume 1 - 756 === page 789 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E48415 / SIMULATOR, INCOMING ROCKET PROPELLED GRENADE (RPG) MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - 0.301 0.307 - 0.307 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - 0.301 0.307 - 0.307 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - 0.301 0.307 - 0.307 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) - - - - - - 75.09 605 0.045 75.09 1,567 0.118 - - - 75.09 1,567 0.118 Subtotal: Recurring Cost - - - - - - - - 0.045 - - 0.118 - - - - - 0.118 - - - - - - - - 0.045 - - 0.118 - - - - - 0.118 ROUND Subtotal: Hardware Cost Support - Production Engineering Cost Production Engineering - - - - - - - - 0.256 - - 0.189 - - - - - 0.189 Subtotal: Support Production Engineering Cost - - - - - - - - 0.256 - - 0.189 - - - - - 0.189 Gross/Weapon System Cost - - - - - - - - 0.301 - - 0.307 - - - - - 0.307 Remarks: Production engineering cost fluctuations from FY 2026 to FY 2027 due to changes in planned procurement and reflects the pro-rated share of support costs within the BLIN. (†) indicates the presence of a P-5a LI 8278E51200 - Simulators, All Types Army UNCLASSIFIED Page 10 of 40 P-1 Line #28 Volume 1 - 757 === page 790 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 TO BE SELECTED / TO BE SELECTED TBD PICATINNY ARSENAL, NJ May 2026 Nov 2027 605 75.09 N 2027 TO BE SELECTED / TO BE SELECTED TBD PICATINNY ARSENAL, NJ Mar 2027 Jun 2028 1,567 75.09 Y LI 8278E51200 - Simulators, All Types Army Location of PCO Item Number / Title [DODIC]: E48415 / SIMULATOR, INCOMING ROCKET PROPELLED GRENADE (RPG) UNCLASSIFIED Page 11 of 40 P-1 Line #28 (Each) RFP Issue Date Volume 1 - 758 === page 791 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E48416 / SIMULATOR, HIGH ORDER BLAST EFFECT (HIOBE) MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - 0.556 0.565 - 0.565 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - 0.556 0.565 - 0.565 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - 0.556 0.565 - 0.565 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) - - - - - - 318.08 260 0.083 318.08 681 0.217 - - - 318.08 681 0.217 Subtotal: Recurring Cost - - - - - - - - 0.083 - - 0.217 - - - - - 0.217 - - - - - - - - 0.083 - - 0.217 - - - - - 0.217 ROUND Subtotal: Hardware Cost Support - Production Engineering Cost Production Engineering - - - - - - - - 0.473 - - 0.348 - - - - - 0.348 Subtotal: Support Production Engineering Cost - - - - - - - - 0.473 - - 0.348 - - - - - 0.348 Gross/Weapon System Cost - - - - - - - - 0.556 - - 0.565 - - - - - 0.565 Remarks: Production engineering cost fluctuations from FY 2026 to FY 2027 due to changes in planned procurement and reflects the pro-rated share of support costs within the BLIN. (†) indicates the presence of a P-5a LI 8278E51200 - Simulators, All Types Army UNCLASSIFIED Page 12 of 40 P-1 Line #28 Volume 1 - 759 === page 792 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 TO BE SELECTED / TO BE SELECTED C / FFP PICATINNY ARSENAL, NJ May 2026 Nov 2027 260 318.08 N 2027 TO BE SELECTED / TO BE SELECTED Option / FFP PICATINNY ARSENAL, NJ Mar 2027 Mar 2028 681 318.08 Y LI 8278E51200 - Simulators, All Types Army Location of PCO Item Number / Title [DODIC]: E48416 / SIMULATOR, HIGH ORDER BLAST EFFECT (HIOBE) UNCLASSIFIED Page 13 of 40 P-1 Line #28 (Each) RFP Issue Date Volume 1 - 760 === page 793 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E48417 / SIMULATOR, TARGET KILL, XM175 MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 1.337 0.742 0.576 0.230 - 0.230 - - - - - - 1.337 0.742 0.576 0.230 - 0.230 - - - - - - 1.337 0.742 0.576 0.230 - 0.230 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 16.72 45,646 0.763 15.52 31,225 0.485 17.54 23,845 0.418 20.49 7,690 0.158 - - - 20.49 7,690 0.158 Subtotal: Recurring Cost - - 0.763 - - 0.485 - - 0.418 - - 0.158 - - - - - 0.158 - - 0.763 - - 0.485 - - 0.418 - - 0.158 - - - - - 0.158 ROUND Subtotal: Hardware Cost Support - Production Engineering Cost Production Engineering - - 0.574 - - 0.257 - - 0.158 - - 0.072 - - - - - 0.072 Subtotal: Support Production Engineering Cost - - 0.574 - - 0.257 - - 0.158 - - 0.072 - - - - - 0.072 Gross/Weapon System Cost - - 1.337 - - 0.742 - - 0.576 - - 0.230 - - - - - 0.230 Remarks: FY 2026 to FY 2027 unit price increase is due to current contract pricing matrix negotiated with vendor. Production engineering cost fluctuations across FY 2025 to FY 2027 due to changes in planned procurement and reflects the pro-rated share of support costs within the BLIN. (†) indicates the presence of a P-5a LI 8278E51200 - Simulators, All Types Army UNCLASSIFIED Page 14 of 40 P-1 Line #28 Volume 1 - 761 === page 794 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements COMPLETE ROUND COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Item Number / Title [DODIC]: E48417 / SIMULATOR, TARGET KILL, XM175 FY Contractor and Location Method/Type or Funding Vehicle 2025 UDC USA, INC. / TAMPA, FL C / FFP PICATINNY ARSENAL, NJ Apr 2025 Oct 2026 31,225 15.52 Y 2026 UDC USA, INC. / TAMPA, FL Option / FFP PICATINNY ARSENAL, NJ May 2026 Aug 2027 23,845 17.54 Y 2027 UDC USA, INC. / TAMPA, FL Option / FFP PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 7,690 20.49 Y LI 8278E51200 - Simulators, All Types Army Location of PCO UNCLASSIFIED Page 15 of 40 Award Date Date of First Delivery P-1 Line #28 Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date Volume 1 - 762 === page 795 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E48418 / SIMULATOR, SMALL ARMS TRACER FIRE-BACK MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - - 0.405 - 0.405 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - - 0.405 - 0.405 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - - 0.405 - 0.405 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) - - - - - - - - - 150.10 1,032 0.155 - - - 150.10 1,032 0.155 Subtotal: Recurring Cost - - - - - - - - - - - 0.155 - - - - - 0.155 - - - - - - - - - - - 0.155 - - - - - 0.155 ROUND Subtotal: Hardware Cost Support - Production Engineering Cost Production Engineering - - - - - - - - - - - 0.250 - - - - - 0.250 Subtotal: Support Production Engineering Cost - - - - - - - - - - - 0.250 - - - - - 0.250 Gross/Weapon System Cost - - - - - - - - - - - 0.405 - - - - - 0.405 (†) indicates the presence of a P-5a LI 8278E51200 - Simulators, All Types Army UNCLASSIFIED Page 16 of 40 P-1 Line #28 Volume 1 - 763 === page 796 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements COMPLETE ROUND O O C FY Contractor and Location 2027 TO BE SELECTED / TO BE SELECTED LI 8278E51200 - Simulators, All Types Army P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Method/Type or Funding Vehicle TBD Location of PCO PICATINNY ARSENAL, NJ UNCLASSIFIED Page 17 of 40 Item Number / Title [DODIC]: E48418 / SIMULATOR, SMALL ARMS TRACER FIRE-BACK Award Date Date of First Delivery May 2027 Nov 2028 P-1 Line #28 Qty (Each) 1,032 Specs Date Unit Cost Avail Revision Now? Available ($) 150.10 RFP Issue Date Y Volume 1 - 764 === page 797 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E49700 / SIMULATOR, Projectile Ground Burst, M115A2 [L594] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 5.001 5.582 6.103 - 6.103 - Gross/Weapon System Cost ($ in Millions) 152.105 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 152.105 Plus CY Advance Procurement ($ in Millions) - - - - - 5.001 5.582 6.103 - 6.103 - Total Obligation Authority ($ in Millions) 152.105 FY 2027 Total - - - - - 5.001 5.582 6.103 - 6.103 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years FY 2025 ($) Qty (Each) Total Cost (†) 161.45 901,108 145.481 33.92 Subtotal: Recurring Cost - - 145.481 - - - 145.481 - First Article Test - - 0.150 Acceptance Test - - 0.107 Subtotal: Support Acceptance Testing Cost - - Production Engineering - Subtotal: Support Production Engineering Cost Cost Elements Unit Cost ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE ROUND Subtotal: Hardware Cost 120,610 4.091 36.14 - 4.091 - - 4.091 - - - - - - - 0.257 - - - 6.332 - - - 6.332 132,727 4.797 39.87 - 4.797 - - 4.797 - - - - - - - - - - - 0.906 - - - 0.906 128,459 5.122 - - - 39.87 128,459 5.122 - 5.122 - - - - - 5.122 - 5.122 - - - - - 5.122 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.778 - - 0.970 - - - - - 0.970 - - 0.778 - - 0.970 - - - - - 0.970 Support - Acceptance Testing Cost Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.035 - - 0.004 - - 0.007 - - 0.011 - - - - - 0.011 Subtotal: Support - Quality Assurance Cost - - 0.035 - - 0.004 - - 0.007 - - 0.011 - - - - - 0.011 Gross/Weapon System Cost - - 152.105 - - 5.001 - - 5.582 - - 6.103 - - - - - 6.103 Remarks: LI 8278E51200 - Simulators, All Types Army UNCLASSIFIED Page 18 of 40 P-1 Line #28 Volume 1 - 765 === page 798 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types ID Code (A=Service Ready, B=Not Service Ready) : A FY 2026 to FY 2027 unit price increase is due to current contract pricing matrix negotiated with vendor. Item Number / Title [DODIC]: E49700 / SIMULATOR, Projectile Ground Burst, M115A2 [L594] MDAP/MAIS Code: FY 2026 to FY 2027 funding increase reflects procurement of ammunition needed to meet training and depot level requirements. (†) indicates the presence of a P-5a LI 8278E51200 - Simulators, All Types Army UNCLASSIFIED Page 19 of 40 P-1 Line #28 Volume 1 - 766 === page 799 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements (†) COMPLETE ROUND (†) COMPLETE ROUND (†) COMPLETE ROUND (†) O O C P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: E49700 / SIMULATOR, Projectile Ground Burst, M115A2 [L594] Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 PYROTECHNIQUE BY GRUCCI INC / RADFORD, VA Option / FFP ROCK ISLAND ARSENAL, IL Jun 2025 Jun 2026 120,610 33.92 Y 2026 PYROTECHNIQUE BY GRUCCI INC / RADFORD, VA Option / FFP ROCK ISLAND ARSENAL, IL Jun 2026 Jun 2027 132,727 36.14 Y 2027 PYROTECHNIQUE BY GRUCCI INC / RADFORD, VA Option / FFP ROCK ISLAND ARSENAL, IL May 2027 May 2028 128,459 39.87 Y RFP Issue Date indicates the presence of a P-21 LI 8278E51200 - Simulators, All Types Army UNCLASSIFIED Page 20 of 40 P-1 Line #28 Volume 1 - 767 === page 800 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E49700 / SIMULATOR, Projectile Ground Burst, M115A2 [L594] Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R J U N J U L A U G S E P B A L A N C E .701 .691 .691 .691 5.528 Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y COMPLETE ROUND Prior Years Deliveries: 901108 1 2025 AF (‡) 8.302 8.302 A - - - - - - - - - - - - 1 2025 ARMY 120.610 .000 120.610 A - - - - - - - - - - - - 1 2025 MC (‡) 105.599 .000 105.599 A - - - - - - - - - - - - 8.810 1 2025 Total 234.511 .000 234.511 - - - - - - - - - - - - 19.566 19.545 19.540 19.540 156.320 1 2026 AF (‡) 7.670 7.670 A - - - - 7.670 1 2026 ARMY 132.727 .000 132.727 A - - - - 132.727 1 2026 MC (‡) 73.787 .000 73.787 A - - - - 73.787 1 2026 Total 214.184 .000 214.184 - - - - 214.184 1 2027 AF (‡) 16.137 .000 16.137 16.137 1 2027 ARMY 128.459 .000 128.459 128.459 1 2027 MC (‡) 66.164 .000 66.164 66.164 (‡) 14.086 .000 14.086 14.086 Total 224.846 .000 224.846 1 2027 1 2027 NAVSEA .000 .000 10.055 10.055 10.050 10.050 80.400 8.799 8.799 8.799 70.392 224.846 O C T LI 8278E51200 - Simulators, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 21 of 40 S E P O C T N O V D E C J A N F E B P-1 Line #28 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 768 === page 801 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E49700 / SIMULATOR, Projectile Ground Burst, M115A2 [L594] Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT B A L A N C E Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y .691 .691 .691 .691 .691 .691 .691 J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 901108 1 2025 AF (‡) 8.302 .691 .000 1 2025 ARMY 120.610 40.210 80.400 10.050 10.050 10.050 10.050 10.050 10.050 10.050 10.050 .000 1 2025 MC (‡) 105.599 35.207 70.392 1 2025 Total 234.511 78.191 156.320 19.540 19.540 19.540 19.540 19.540 19.540 19.540 19.540 1 2026 AF (‡) 7.670 1 2026 ARMY 1 2026 MC 1 2.774 8.799 8.799 8.799 8.799 8.799 8.799 8.799 8.799 .000 - - - - - - - - - - - - - - - - .641 .639 .639 .639 .639 .639 .639 .639 .639 .639 .639 .639 .000 .000 .000 7.670 - - - - - - - - 132.727 .000 132.727 - - - - - - - - 11.067 11.060 11.060 11.060 11.060 11.060 11.060 11.060 11.060 11.060 11.060 11.060 (‡) 73.787 .000 73.787 - - - - - - - - 6.159 2026 Total 214.184 .000 214.184 - - - - - - - - 17.867 17.847 17.847 17.847 17.847 17.847 17.847 17.847 17.847 17.847 17.847 17.847 1 2027 AF (‡) 16.137 .000 16.137 A - - - - - 1.344 1.344 1.344 1.344 1.344 1.344 - 1.353 1 2027 ARMY 128.459 .000 128.459 A - - - - - - - - - - - - 10.715 10.704 10.704 10.704 10.704 74.928 1 2027 MC (‡) 66.164 .000 66.164 A - - - - - - - - - - - - 5.521 5.513 5.513 5.513 5.513 38.591 (‡) 14.086 .000 14.086 A - - - - - - - - - - - - 1.183 1.173 1.173 1.173 1.173 Total 224.846 .000 224.846 - 1.344 1.344 1.344 1.344 1.344 1.344 - 18.772 18.734 18.734 18.734 18.734 123.074 O C T N O V D E C J A N F E B M A R 1 2027 1 2027 NAVSEA .000 5.528 O C T LI 8278E51200 - Simulators, All Types Army N O V D E C J A N F E B M A R A P R M A Y 6.148 J U N 6.148 J U L 6.148 A U G UNCLASSIFIED Page 22 of 40 S E P 6.148 6.148 6.148 6.148 6.148 P-1 Line #28 6.148 6.148 A P R 6.148 M A Y .000 - - - - .000 1.344 1.344 1.344 1.344 1.344 J U N J U L A U G 8.211 S E P Volume 1 - 769 === page 802 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: E49700 / SIMULATOR, Projectile Ground Burst, M115A2 [L594] Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P COMPLETE ROUND Prior Years Deliveries: 901108 1 2025 AF (‡) 8.302 8.302 .000 .000 1 2025 ARMY 120.610 120.610 .000 .000 1 2025 MC (‡) 105.599 105.599 .000 1 2025 Total 234.511 234.511 .000 1 2026 AF (‡) 7.670 7.670 .000 .000 1 2026 ARMY 132.727 132.727 .000 .000 1 2026 MC (‡) 73.787 73.787 .000 1 2026 Total 214.184 214.184 .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 1 2027 AF (‡) 16.137 14.793 1.344 - - - - - - - - - - - - - - - - - - - - - - - 1.344 .000 1 2027 ARMY 128.459 53.531 74.928 10.704 10.704 10.704 10.704 10.704 10.704 10.704 - - - - - - - - - - - - - - - - - .000 1 2027 MC (‡) 66.164 27.573 38.591 5.513 5.513 5.513 5.513 5.513 5.513 5.513 - - - - - - - - - - - - - - - - - .000 (‡) 14.086 5.875 1.173 1.173 1.173 1.173 1.173 1.173 - - - - - - - - - - - - - - - - - 1.173 .000 Total 224.846 - 2.517 .000 1 2027 1 2027 NAVSEA 8.211 .000 - - - - - - - - - - - - - - - - - - - - - - - - .000 .000 101.772 123.074 17.390 17.390 17.390 17.390 17.390 17.390 16.217 O C T LI 8278E51200 - Simulators, All Types Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 23 of 40 S E P O C T N O V D E C J A N F E B P-1 Line #28 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 770 === page 803 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Item Number / Title [DODIC]: E49700 / SIMULATOR, Projectile Ground Burst, M115A2 [L594] Production Rates (Each / Month) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 PYROTECHNIQUE BY GRUCCI INC - RADFORD, VA MSR For 2027 1-8-5 For 2027 MAX For 2027 10,000 65,000 100,000 ALT Prior to Oct 1 ALT After Oct 1 8 Reorder Manufacturing PLT 8 18 Total After Oct 1 ALT Prior to Oct 1 26 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 12 18 (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 8278E51200 - Simulators, All Types Army UNCLASSIFIED Page 24 of 40 P-1 Line #28 Volume 1 - 771 === page 804 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E50200 / SIMULATOR, Hand Grenade, M116A1 [L601] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 2.312 1.057 1.214 - 1.214 - Gross/Weapon System Cost ($ in Millions) 111.380 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 111.380 Plus CY Advance Procurement ($ in Millions) - - - - - 2.312 1.057 1.214 - 1.214 - Total Obligation Authority ($ in Millions) 111.380 FY 2027 Total - - - - - 2.312 1.057 1.214 - 1.214 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years FY 2025 FY 2026 (Each) (†) 204.99 496,771 101.833 28.49 69,902 1.992 30.37 29,410 0.893 31.00 31,929 0.990 - - - 31.00 31,929 0.990 Subtotal: Recurring Cost - - 101.833 - - 1.992 - - 0.893 - - 0.990 - - - - - 0.990 - - 101.833 - - 1.992 - - 0.893 - - 0.990 - - - - - 0.990 First Article Test - - 0.382 - - - - - - - - - - - - - - - Subtotal: Support Acceptance Testing Cost - - 0.382 - - - - - - - - - - - - - - - Production Verification Test - - 0.110 - - - - - - - - - - - - - - - Subtotal: Support - Product Improvement Cost - - 0.110 - - - - - - - - - - - - - - - Production Engineering - - 8.592 - - 0.315 - - 0.160 - - 0.214 - - - - - 0.214 Subtotal: Support Production Engineering Cost - - 8.592 - - 0.315 - - 0.160 - - 0.214 - - - - - 0.214 Quality Assurance - - 0.033 - - 0.006 - - 0.004 - - 0.010 - - - - - 0.010 Subtotal: Support - Quality Assurance Cost - - 0.033 - - 0.006 - - 0.004 - - 0.010 - - - - - 0.010 ($ M) ($) Qty (Each) Unit Cost ($ M) ($) Qty (Each) Unit Cost ($ M) ($) Total Cost FY 2027 Total ($) Cost Elements Unit Cost Total Cost FY 2027 OOC Qty Unit Cost Total Cost FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE ROUND Subtotal: Hardware Cost Support - Acceptance Testing Cost Support - Product Improvement Cost Support - Production Engineering Cost Support - Quality Assurance Cost LI 8278E51200 - Simulators, All Types Army UNCLASSIFIED Page 25 of 40 P-1 Line #28 Volume 1 - 772 === page 805 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E50200 / SIMULATOR, Hand Grenade, M116A1 [L601] MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Support - Study & Analysis Cost - - 0.430 - - - - - - - - - - - - - - - Subtotal: Support - Study & Analysis Cost Study & Analysis - - 0.430 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 111.380 - - 2.312 - - 1.057 - - 1.214 - - - - - 1.214 Remarks: FY 2026 to FY 2027 unit price increase is due to current contract pricing matrix negotiated with vendor. FY 2026 to FY 2027 funding increase reflects procurement of ammunition needed to meet training and depot level requirements. (†) indicates the presence of a P-5a LI 8278E51200 - Simulators, All Types Army UNCLASSIFIED Page 26 of 40 P-1 Line #28 Volume 1 - 773 === page 806 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements COMPLETE ROUND COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 PYROTECHNIQUE BY GRUCCI INC / RADFORD, VA Option / FFP ROCK ISLAND ARSENAL, IL Jun 2025 Jun 2026 69,902 28.49 Y 2026 PYROTECHNIQUE BY GRUCCI INC / RADFORD, VA Option / FFP ROCK ISLAND ARSENAL, IL Jun 2026 Jun 2027 29,410 30.37 Y 2027 PYROTECHNIQUE BY GRUCCI INC / RADFORD, VA Option / FFP ROCK ISLAND ARSENAL, IL May 2027 May 2028 31,929 31.00 Y LI 8278E51200 - Simulators, All Types Army Location of PCO Item Number / Title [DODIC]: E50200 / SIMULATOR, Hand Grenade, M116A1 [L601] UNCLASSIFIED Page 27 of 40 P-1 Line #28 (Each) RFP Issue Date Volume 1 - 774 === page 807 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E50311 / SIMULATOR, CHEM ATTACK, YELLOW SMOKE MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 0.383 0.065 0.046 0.067 - 0.067 - - - - - - 0.383 0.065 0.046 0.067 - 0.067 - - - - - - 0.383 0.065 0.046 0.067 - 0.067 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 15.00 12,158 0.182 - - - 17.54 1,904 0.033 25.18 1,849 0.047 - - - 25.18 1,849 0.047 Subtotal: Recurring Cost - - 0.182 - - - - - 0.033 - - 0.047 - - - - - 0.047 - - 0.182 - - - - - 0.033 - - 0.047 - - - - - 0.047 ROUND Subtotal: Hardware Cost Support - Production Engineering Cost Production Engineering - - 0.201 - - 0.065 - - 0.013 - - 0.020 - - - - - 0.020 Subtotal: Support Production Engineering Cost - - 0.201 - - 0.065 - - 0.013 - - 0.020 - - - - - 0.020 Gross/Weapon System Cost - - 0.383 - - 0.065 - - 0.046 - - 0.067 - - - - - 0.067 Remarks: FY 2026 to FY 2027 unit price increase is due to current contract pricing matrix negotiated with vendor. Production engineering cost fluctuations across FY 2025 to FY 2027 due to changes in planned procurement and reflects the pro-rated share of support costs within the BLIN. (†) indicates the presence of a P-5a LI 8278E51200 - Simulators, All Types Army UNCLASSIFIED Page 28 of 40 P-1 Line #28 Volume 1 - 775 === page 808 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 ULTRA DEFENSE CORPORATION (UDC) / MARSHALL, TX Option / FFP PICATINNY ARSENAL, NJ May 2026 Aug 2027 1,904 17.54 Y 2027 ULTRA DEFENSE CORPORATION (UDC) / MARSHALL, TX Option / FFP PICATINNY ARSENAL, NJ Mar 2027 Mar 2028 1,849 25.18 Y LI 8278E51200 - Simulators, All Types Army Location of PCO Item Number / Title [DODIC]: E50311 / SIMULATOR, CHEM ATTACK, YELLOW SMOKE UNCLASSIFIED Page 29 of 40 P-1 Line #28 (Each) RFP Issue Date Volume 1 - 776 === page 809 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E70600 / SIMULATOR, Rocket, Antitank GM Lnchd, M22 (ATWESS) [LA77] MDAP/MAIS Code: Resource Summary Prior Years FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - - Gross/Weapon System Cost ($ in Millions) 60.701 1.249 - - - - Less PY Advance Procurement ($ in Millions) - - - - - - 60.701 1.249 - - - - - - - - - - 60.701 1.249 - - - - Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Complete Round 70.58 54.648 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 54.649 - - - - - - - - - - - - - - - - - 54.649 - - - - - - - - - - - - - - - Production Engineering - - 6.030 - - 1.238 - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - 6.030 - - 1.238 - - - - - - - - - - - - Subtotal: Hardware Cost 774,267 Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.023 - - 0.011 - - - - - - - - - - - - Subtotal: Support - Quality Assurance Cost - - 0.023 - - 0.011 - - - - - - - - - - - - Gross/Weapon System Cost - - 60.701 - - 1.249 - - - - - - - - - - - - LI 8278E51200 - Simulators, All Types Army UNCLASSIFIED Page 30 of 40 P-1 Line #28 Volume 1 - 777 === page 810 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E88119 / SIMULATOR, Hostile Fire, M34 MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 7.359 1.969 1.628 1.246 - 1.246 - - - - - - 7.359 1.969 1.628 1.246 - 1.246 - - - - - - 7.359 1.969 1.628 1.246 - 1.246 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 29.55 Subtotal: Recurring Cost - ROUND Subtotal: Hardware Cost 178,484 5.275 9.22 - 5.275 - - 5.275 - - - 0.365 - - 161,262 1.487 8.75 - 1.487 - - 1.487 - - - - 0.365 - - 110,693 0.969 13.46 43,200 0.581 - - - 13.46 43,200 0.581 - 0.969 - - 0.581 - - - - - 0.581 - 0.969 - - 0.581 - - - - - 0.581 - - - - - - - - - - - - - - - - - - - - - - - - - Support - Product Improvement Cost Reliability Subtotal: Support - Product Improvement Cost Support - Production Engineering Cost Production Engineering - - 1.719 - - 0.482 - - 0.659 - - 0.665 - - - - - 0.665 Subtotal: Support Production Engineering Cost - - 1.719 - - 0.482 - - 0.659 - - 0.665 - - - - - 0.665 Gross/Weapon System Cost - - 7.359 - - 1.969 - - 1.628 - - 1.246 - - - - - 1.246 Remarks: FY 2026 to FY 2027 unit price increase is due to current contract pricing matrix negotiated with vendor. (†) indicates the presence of a P-5a LI 8278E51200 - Simulators, All Types Army UNCLASSIFIED Page 31 of 40 P-1 Line #28 Volume 1 - 778 === page 811 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements COMPLETE ROUND COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 ULTRA DEFENSE CORPORATION (UDC) / MARSHALL, TX C / FFP PICATINNY ARSENAL, NJ Sep 2025 Mar 2027 161,262 9.22 Y 2026 ULTRA DEFENSE CORPORATION (UDC) / MARSHALL, TX Option / FFP PICATINNY ARSENAL, NJ Sep 2026 Apr 2028 110,693 8.75 Y 2027 ULTRA DEFENSE CORPORATION (UDC) / MARSHALL, TX Option / FFP PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 43,200 13.46 Y LI 8278E51200 - Simulators, All Types Army Location of PCO Item Number / Title [DODIC]: E88119 / SIMULATOR, Hostile Fire, M34 UNCLASSIFIED Page 32 of 40 P-1 Line #28 RFP Issue Date Volume 1 - 779 === page 812 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E88125 / SIMULATOR, Target Hit, M35 (White Star) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 6.465 1.206 0.721 0.803 - 0.803 - - - - - - 6.465 1.206 0.721 0.803 - 0.803 - - - - - - 6.465 1.206 0.721 0.803 - 0.803 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 33.60 Subtotal: Recurring Cost - ROUND Subtotal: Hardware Cost 171,741 5.770 7.59 - 5.770 - - 5.770 - 130,650 0.992 8.45 50,805 0.429 8.52 46,910 0.400 - - - 8.52 46,910 0.400 - 0.992 - - 0.429 - - 0.400 - - - - - 0.400 - 0.992 - - 0.429 - - 0.400 - - - - - 0.400 Support - Production Engineering Cost Production Engineering - - 0.695 - - 0.214 - - 0.292 - - 0.403 - - - - - 0.403 Subtotal: Support Production Engineering Cost - - 0.695 - - 0.214 - - 0.292 - - 0.403 - - - - - 0.403 Gross/Weapon System Cost - - 6.465 - - 1.206 - - 0.721 - - 0.803 - - - - - 0.803 Remarks: FY 2026 to FY 2027 unit price increase is due to current contract pricing matrix negotiated with vendor. (†) indicates the presence of a P-5a LI 8278E51200 - Simulators, All Types Army UNCLASSIFIED Page 33 of 40 P-1 Line #28 Volume 1 - 780 === page 813 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements COMPLETE ROUND COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 ULTRA DEFENSE CORPORATION (UDC) / MARSHALL, TX C / FFP PICATINNY ARSENAL, NJ Sep 2025 Mar 2027 130,650 7.59 Y 2026 ULTRA DEFENSE CORPORATION (UDC) / MARSHALL, TX Option / FFP PICATINNY ARSENAL, NJ Sep 2026 Apr 2029 50,805 8.45 Y 2027 ULTRA DEFENSE CORPORATION (UDC) / MARSHALL, TX Option / FFP PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 46,910 8.52 Y LI 8278E51200 - Simulators, All Types Army Location of PCO Item Number / Title [DODIC]: E88125 / SIMULATOR, Target Hit, M35 (White Star) UNCLASSIFIED Page 34 of 40 P-1 Line #28 RFP Issue Date Volume 1 - 781 === page 814 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E91112 / SIMULATOR, PROJECTILE GROUND BURST: MINI BLAST: XM MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - 0.225 0.229 - 0.229 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - 0.225 0.229 - 0.229 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - 0.225 0.229 - 0.229 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) - - - - - - 30.00 1,116 0.033 30.90 2,849 0.088 - - - 30.90 2,849 0.088 Subtotal: Recurring Cost - - - - - - - - 0.033 - - 0.088 - - - - - 0.088 - - - - - - - - 0.033 - - 0.088 - - - - - 0.088 ROUND Subtotal: Hardware Cost Support - Production Engineering Cost Production Engineering - - - - - - - - 0.192 - - 0.141 - - - - - 0.141 Subtotal: Support Production Engineering Cost - - - - - - - - 0.192 - - 0.141 - - - - - 0.141 Gross/Weapon System Cost - - - - - - - - 0.225 - - 0.229 - - - - - 0.229 (†) indicates the presence of a P-5a LI 8278E51200 - Simulators, All Types Army UNCLASSIFIED Page 35 of 40 P-1 Line #28 Volume 1 - 782 === page 815 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2026 TO BE SELECTED / TO BE SELECTED C / FFP PICATINNY ARSENAL, NJ May 2026 Nov 2027 1,116 30.00 N 2027 TO BE SELECTED / TO BE SELECTED Option / FFP PICATINNY ARSENAL, NJ Mar 2027 Sep 2028 2,849 30.90 Y LI 8278E51200 - Simulators, All Types Army Location of PCO Item Number / Title [DODIC]: E91112 / SIMULATOR, PROJECTILE GROUND BURST: MINI BLAST: XM UNCLASSIFIED Page 36 of 40 P-1 Line #28 (Each) RFP Issue Date Volume 1 - 783 === page 816 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E91114 / SIMULATOR, LAUNCHING, ANTITANK GUIDED MISSILE AND MDAP/MAIS Code: Resource Summary Prior Years FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - - Gross/Weapon System Cost ($ in Millions) 0.560 0.891 - - - - Less PY Advance Procurement ($ in Millions) - - - - - - 0.560 0.891 - - - - - - - - - - 0.560 0.891 - - - - Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 19.04 20,781 0.396 15.94 23,099 0.368 - - - - - - - - - - - - Subtotal: Recurring Cost - - 0.396 - - 0.368 - - - - - - - - - - - - - - 0.396 - - 0.368 - - - - - - - - - - - - ROUND Subtotal: Hardware Cost Support - Production Engineering Cost Production Engineering - - 0.164 - - 0.523 - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - 0.164 - - 0.523 - - - - - - - - - - - - Gross/Weapon System Cost - - 0.560 - - 0.891 - - - - - - - - - - - - (†) indicates the presence of a P-5a LI 8278E51200 - Simulators, All Types Army UNCLASSIFIED Page 37 of 40 P-1 Line #28 Volume 1 - 784 === page 817 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements COMPLETE ROUND O O C P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types FY Contractor and Location 2025 ULTRA DEFENSE CORPORATION (UDC) / MARSHALL, TX LI 8278E51200 - Simulators, All Types Army Method/Type or Funding Vehicle C / FFP Location of PCO PICATINNY ARSENAL, NJ UNCLASSIFIED Page 38 of 40 Item Number / Title [DODIC]: E91114 / SIMULATOR, LAUNCHING, ANTITANK GUIDED MISSILE AND Award Date Date of First Delivery Sep 2025 Apr 2028 P-1 Line #28 Qty (Each) 23,099 Specs Date Unit Cost Avail Revision Now? Available ($) 15.94 RFP Issue Date Y Volume 1 - 785 === page 818 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E91116 / SIMULATOR, PROJECTILE AIR BURST, EXPLOSIVE: XM181 MDAP/MAIS Code: Resource Summary Prior Years FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - - Gross/Weapon System Cost ($ in Millions) 0.595 0.300 - - - - Less PY Advance Procurement ($ in Millions) - - - - - - 0.595 0.300 - - - - - - - - - - 0.595 0.300 - - - - Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 15.61 35,602 0.556 16.05 12,628 0.203 - - - - - - - - - - - - Subtotal: Recurring Cost - - 0.556 - - 0.203 - - - - - - - - - - - - - - 0.556 - - 0.203 - - - - - - - - - - - - ROUND Subtotal: Hardware Cost Support - Production Engineering Cost Production Engineering - - 0.039 - - 0.097 - - - - - - - - - - - - Subtotal: Support Production Engineering Cost - - 0.039 - - 0.097 - - - - - - - - - - - - Gross/Weapon System Cost - - 0.595 - - 0.300 - - - - - - - - - - - - (†) indicates the presence of a P-5a LI 8278E51200 - Simulators, All Types Army UNCLASSIFIED Page 39 of 40 P-1 Line #28 Volume 1 - 786 === page 819 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 47 Cost Elements COMPLETE ROUND O O C P-1 Line Item Number / Title: 8278E51200 / Simulators, All Types FY Contractor and Location 2025 ULTRA DEFENSE CORPORATION (UDC) / MARSHALL, TX LI 8278E51200 - Simulators, All Types Army Method/Type or Funding Vehicle C / FFP Location of PCO PICATINNY ARSENAL, NJ UNCLASSIFIED Page 40 of 40 Item Number / Title [DODIC]: E91116 / SIMULATOR, PROJECTILE AIR BURST, EXPLOSIVE: XM181 Award Date Date of First Delivery Sep 2025 Apr 2028 P-1 Line #28 Qty (Each) 12,628 Specs Date Unit Cost Avail Revision Now? Available ($) 16.05 RFP Issue Date Y Volume 1 - 787 === page 820 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 9847E97900 / REACTIVE ARMOR TILES Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 76.342 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 76.342 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 76.342 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 214.418 214.418 214.418 To FY 2031 Complete Total 290.760 290.760 290.760 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Reactive armor is an add-on armor to the base vehicle configuration. This armor reacts based on the impact of a threat, reducing or eliminating the damage to the protected vehicle, thus increasing its survivability. Reactive armor tiles vary based on the platform installation design, vehicle threat requirements, and weight margins of the supported platform. (ES97911) - PROJ, Combat Vehicle Reactive Armor Tile The RAT Program was designated as a Program of Record in August 2018 in support of US Government developed tile configurations. Initial production of the US government developed tiles will support achieving the Directed Requirement (DR) for Reactive Armor Tiles and Installation Kits for five (5) armored brigade combat teams consisting of multiple combat platform types. Additionally, these tiles will be painted with the new signature management paint. Newly procured tiles will be painted at the production site, and legacy tiles will be painted as part of the refurbishment process and on site if tiles have already been placed in Army Pre-Positioned Stock. Production beyond the Directed Requirement will take place to meet the Total Munitions Requirements established by G-3/5/7 and to replace consumed tiles. The Vehicle Protection System office is the centralized manager of RAT for the ground combat systems responsible for the accountability and acquisition of tiles. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 - 214.418 214.418 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Justification: In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. There is no FY 2027 request for this program. LI 9847E97900 - REACTIVE ARMOR TILES Army UNCLASSIFIED Page 1 of 2 P-1 Line #29 Volume 1 - 788 === page 821 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 47: Other Ammunition ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 9847E97900 / REACTIVE ARMOR TILES Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A LI 9847E97900 - REACTIVE ARMOR TILES Army UNCLASSIFIED Page 2 of 2 P-1 Line #29 Volume 1 - 789 === page 822 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 0684EB0016 / Ammo Components, All Types Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 50: Miscellaneous Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 3.268 4.084 4.109 - 4.109 4.106 4.148 4.163 4.206 - 744.003 744.003 744.003 To FY 2031 Complete - - - - - - - - - - 3.268 4.084 4.109 - 4.109 4.106 4.148 4.163 4.206 - - - - - - - - - - - 3.268 4.084 4.109 - 4.109 4.106 4.148 4.163 4.206 - Total 772.087 772.087 772.087 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line includes the Components and Renovation (C&R) of Field Stock effort as well as Weapon Components in support of Proof Acceptance Testing (PAT). The C&R effort supports renovation for unserviceable training and combat ammunition, returning unserviceable items to issuable serviceable condition at a lower cost when compared with procuring new ammunition. The testing efforts include funding to support the Army Test and Evaluation Command (ATEC) at Aberdeen and Yuma Test Centers. Funded testing includes Special Tests, First Article Tests (FAT), Renovation of Field Stocks, and PAT for training and combat ammunition. Justification: FY 2027 Base procurement dollars in the amount of $2.477 million support the Components and Renovation of Field Stock (C&R) effort. C&R supports the renovation of unserviceable training and combat ammunition, returning unserviceable items to issuable, serviceable condition at a substantial cost savings to the Army when compared to costs to demilitarize and procure new, replacement stock. Proposed C&R efforts undergo cost analysis to compare proposed renovation costs or rework efforts to the cost associated with demilitarization and new procurement to ensure efforts conducted under C&R result in a cost savings to the Army. The efforts are primarily focused on condition codes E and F within Army inventory. FY 2027 Base procurement dollars in the amount of $1.632 million, in addition to previous years procurement dollars, supports several initiatives at Aberdeen Test Center (ATC) and Yuma Test Center (YTC). At ATC, continue a replacement and procurement program for weapons and weapon components that are worn during testing of production ammunition items. Typical purchases include: rifle/carbine/machine gun barrels, receivers, and parts; large caliber barrels; small and medium caliber Mann-type test barrels, mortar barrels and bipod/baseplates. At YTC, continue to acquire and replace weapon components required for continued support of the Production Acceptance Test (PAT) as part of the indirect fire test mission. Purchases include components such as breeches and tubes for medium to large caliber mortars and cannons. At YTC, continue to procure replacement parts for both large and small caliber direct fire weapon systems for production-based support. The primary items to be purchased are recoils, breeches, cradles, and gun tubes for both 120mm M256 and 105mm M68 cannons. In addition, spares will be obtained for 25mm and small arms weapon systems, along with other supporting equipment such as solenoids and bore-sighting equipment. LI 0684EB0016 - Ammo Components, All Types Army UNCLASSIFIED Page 1 of 1 P-1 Line #30 Volume 1 - 790 === page 823 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 2624EA0055 / Items Less Than $5 Million (AMMO) Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 50: Miscellaneous ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 18.797 16.799 16.290 - 16.290 14.126 12.633 12.225 12.346 - 254.609 254.609 - - - - - - - - - - 18.797 16.799 16.290 - 16.290 14.126 12.633 12.225 12.346 - 254.609 To FY 2031 Complete - - - - - - - - - - 18.797 16.799 16.290 - 16.290 14.126 12.633 12.225 12.346 - Total 357.825 357.825 357.825 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This budget line includes Miscellaneous Ammunition Items Under $5 million. (E00100) CTG 10 Gauge Blank is a is a training unique item used in ceremonies. E00100 is a new start within the Items Less Than $5 Million (AMMO) program in FY 2026. This item is Code A, approved for service use. (E00300) CTG 12 Gauge Shotgun 7 1/2 CHILLED SHOT is a 12 gauge 2 3/4-inch round with #7 1/2 pellets (approximately 2.39mm (0.094") diameter and weighs about 1.25 grains each) and can be fired out of the M26, M1014, Mossberg Model 500/590, and Remington 870/MCS shotguns. This item is Code A, approved for service use. (E01700) CTG, .22cal Ball Long Rifle Match, f/Rifle [A091] is used for military marksmanship training. This item is Code A, approved for service use. (E03001) CTG, CAL .30 BLANK is used for salute ceremonies by Veteran Organizations in the M1 Garand rifles without being equipped with a firing adapter. It can be identified by the absence of a bullet and a rosette crimped case-mouth. This item is Code A, approved for service use. (E03710) CTG, .338cal Norma Magnum, AP, M1162 f/Rifle procurement supports the Mk22 Precision Sniper Rifle (PSR). It is composed of a standard brass cartridge case, propellant, percussion primer and armor piercing projectile. This item is Code A, approved for service use. (E03715) CTG, .300cal Norma Magnum, M1163 f/Rifle procurement supports the Mk22 Precision Sniper Rifle (PSR). It is composed of a standard brass cartridge case, propellant, percussion primer and copper jacketed projectile. This item is Code A, approved for service use. (E99101) SPECIAL TRAINING AMMO includes procurement of nonstandard and commercially-available specialty munitions and energetic materiel in support of United States Army troop training requirements defined by the Standards in Training Commission (STRAC) and set forth in Unit Programs of Instruction (POIs). Requirements and authorizations issued by HQDA G-3/5/7 TRA are in accordance with Army Regulation (AR) 5-13 and are vetted through the Army Munitions Requirements Working Group and Council of Colonels. Unit requirements funded by this program include the US Army Military District of Washington, National Guard Bureau and Army Reserve, National and Joint Readiness Training Centers, and US Army Parachute Team as well as other specialized unit training requirements submitted for consideration during fiscal year execution. LI 2624EA0055 - Items Less Than $5 Million (AMMO) Army UNCLASSIFIED Page 1 of 20 P-1 Line #31 Volume 1 - 791 === page 824 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 50: Miscellaneous ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2624EA0055 / Items Less Than $5 Million (AMMO) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A (E99222) Foreign Weapons Training Ammunition. Foreign weapons ammunition procures munitions that have not been Type Classified, Materiel Released or Fielded for standard use by United States Army or other Department of War (DoW) services. It is not stocked/procured in standard DoW supply system. Funds will be used to purchase foreign (Non-NATO) standard munitions, training devices and materials, conduct safety and quality assessments, and ship the munitions to their required destination. This funding also procures nonstandard ammunition training requirements identified by U.S. Army training units and centers and authorized by HQDA G-3/5/7 TRA IAW AR 5-13. (EA0600) Ammunition Program Support - The Ammunition Program Support effort enhances the management of ammunition and provides systems and services which the Army is required to provide as the Single Manager for Conventional Ammunition in accordance with DODI 5160.68. Funding is used to enhance the efficiency and effectiveness of ammunition management across the lifecycle through process improvements, generation of metrics and decision support analysis. (EA0960) USAMTU FT BENNING (United States Army Marksmanship Training Unit). This budget line funds procurement of nonstandard and commercially available specialty munitions and energetic materiel in support of US Army Marksmanship Unit training requirements. Requirements and authorizations issued by Army G-3 are in accordance with Army Regulation (AR) 5-13 and are vetted through the Army Munitions Requirements Working Group and Council of Colonels. LI 2624EA0055 - Items Less Than $5 Million (AMMO) Army UNCLASSIFIED Page 2 of 20 P-1 Line #31 Volume 1 - 792 === page 825 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 2624EA0055 / Items Less Than $5 Million (AMMO) Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 50: Miscellaneous ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD P-5 E00100 / CTG 10 GAUGE BLANK P-5 E00300 / CARTRIDGE 12 GAUGE SHOTGUN 7 1/2 CHILLED SHOT [A014] P-5a A P-5 E01700 / CTG, .22cal Ball Long Rifle Match, f/Rifle [A091] P-5a A P-5 E03001 / CTG, .30cal Blank, M1909, Single [A222] P-5a P-5 E03710 / CTG, .338CAL NORMA MAGNUM, AP, M1162 F/RIFLE P-5 E03715 / CTG, .300CAL NORMA MAGNUM, M1163 F/RIFLE P-5 MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) A - / 1.613 - / 0.225 - - / 0.339 - / 0.007 - - / 7.661 - / 0.043 A - / 35.085 - / 1.945 P-5a A - / 13.112 - P-5a A - / 14.201 E99101 / Special Training Ammo: A - P-5 E99222 / Foreign Weapons Training Ammunition A P-5 / 0.800 - / - - / - - / - / 0.007 - / 0.013 - / - - / 0.013 / - - / 0.103 - / - - / 0.103 - / 1.976 - / 1.440 - / - - / 1.440 / 5.631 - / 3.267 - / 3.321 - / - - / 3.321 - / 3.847 - / 3.976 - / 3.353 - / - - / 3.353 / 37.659 - / 0.761 - / 0.759 - / 0.764 - / - - / 0.764 - / 3.403 - / 0.515 - / 0.512 - / 0.515 - / - - / 0.515 EA0600 / AMMUNITION PROGRAM SUPPORT - / 95.493 - / 4.287 - / 3.974 - / 5.242 - / - - / 5.242 P-5 EA0960 / USAMTU FT BENNING - / 46.043 - / 1.536 - / 1.528 - / 1.539 - / - - / 1.539 P-40 Total Gross/Weapon System Cost - / 254.609 - / 18.797 - / 16.799 - / 16.290 - / - - / 16.290 - *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 base budget supports critical Army Title 10 war reserve/operational, training, and test requirements in accordance with DoDI 3000.04 (Munitions Requirements Process) and AR 5-13 (Total Army Munitions Requirements Process and Prioritization System). War reserve requirements support Office of the Secretary of War (OSW)-approved Combatant Commander Operational Plans, Homeland Defense, and other OSW-directed missions. Training requirements support individual and collective training of Active and Reserve Component forces at Army schools, home station, and the combined training centers. Test requirements support the development, fielding, safety, and quality assurance of Army munitions and equipment throughout their life-cycle. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), these items are necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. FY 2027 Total dollars in the amount of $16.290 million supports the procurement of 3.590 million cartridges. (E00100) / CTG 10 Gauge Blank is a training unique item not used in combat. There is no FY 2027 budget request for this funding line. Type Classification date: (E00300) CTG 12 Gauge Shotgun 7.5 Chilled Shot is a war reserve item used in combat. The FY 2027 request builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $0.013 million support the procurement of 0.019 million 12 Gauge Shotgun 7.5 Chilled cartridges. Type Classification date: November 1975. (E01700) CTG, .22cal Ball Long Rifle Match, f/Rifle is a training standard item and is used for military marksmanship training. The FY 2027 request builds a war reserve inventory in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $0.103 million support the procurement of 0.429 million 22cal Ball Long Rifle Match, f/Rifle. The 22cal Ball Long Rifle Match round is procured via a skip-year acquisition strategy. LI 2624EA0055 - Items Less Than $5 Million (AMMO) Army UNCLASSIFIED Page 3 of 20 P-1 Line #31 Volume 1 - 793 === page 826 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 50: Miscellaneous ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 2624EA0055 / Items Less Than $5 Million (AMMO) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Type Classification Guide: January 1990. (E03001) CTG, CAL .30 BLANK, M1909 is a training unique item not used in combat. The FY 2027 request supports annual training and builds a depot level in accordance with the Army's procurement goals. FY 2027 Base procurement dollars in the amount of $1.440 million supports the procurement of 1.507 million .30 Caliber Blank M1909 cartridges. Type classification date: 1917 (E03710) CTG, .338cal Norma Magnum, AP, M1162 f/Rifle is a training standard item used in both training and combat. The FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. The FY 2027 Base procurement dollars in the amount of $3.321 million supports the procurement of 0.276 million, M1162 f/Rifle cartridges. Type classification date: May 2024 (E03715) CTG, .300cal Norma Magnum, M1163 f/Rifle is a training standard item used in both training and combat. The FY 2027 request supports annual training and builds a war reserve inventory in accordance with the Army's procurement goals. The FY 2027 Base procurement dollars in the amount of $3.353 million supports the procurement of 1.069 million, M1163 f/Rifle cartridges. Type classification date: May 2024 (E99101) Special Training Ammunition - FY 2027 funds procure nonstandard and commercially-available specialty munitions and energetic materiel in support of FY 2027 US Army troop training requirements in accordance with DA G3/7-TRA authorizations. FY 2027 base funds in the amount of $0.764 million procures U.S. Army troop training ammunition requirements defined by the Standards in Training Commission (STRAC) and set forth in unit Programs of Instruction (POIs). Requirements and authorizations issued by HQDA G-3/5/7 are in accordance with AR 5-13 and are vetted through the Army Munitions Requirements Working Group and Council of Colonels. Special Training Ammunition supports specialized unit training requirements that cannot be accomplished with standard issue U.S. Army ammunition stock. (E99222) Foreign Weapons Training Ammunition. FY 2027 funds will be used to procure Non-DOW Standard Ammunition (NSA), related Non-DOW Standard Weapons Systems (NSWS), as well as related training aids for Army units supporting the Regionally Aligned Forces (RAF) mission. Army units will conduct preparation training with Non-standard weapons and munitions before deployment in order to be trained to support requirements, including operational missions, bilateral and multilateral military exercises and security cooperation activities. The FY 2027 Base procurement dollars in the amount of $0.515 million supports the procurement of 0.290 million, Non-Standard Ammunition rounds. (EA0600) Ammunition Program Support - FY 2027 funds in the amount of $5.242 million provide critical support to efficiently and effectively manage ammunition across the portfolio. Funds support systems and services which are required to be provided by the Army as the Single Manager for Conventional Ammunition in accordance with DODI 5160.68. (EA0960) USAMTU FT Benning - FY 2027 funds in the amount of $1.539 million procures nonstandard and commercially-available specialty munitions and energetic materiel in support of U.S. Army Marksmanship Training Unit (USAMTU) training requirements. Requirements and authorizations issued by HQDA G-3/5/7 are in accordance with AR 5-13 and are vetted through the Army Munitions Requirements Working Group and Council of Colonels. USAMTU funds support specialized unit training requirements that cannot be accomplished with standard issue U.S. Army ammunition stock. Such requirements are submitted to and authorized by HQDA G-3/5/7 on an annual basis in accordance with AR 5-13. LI 2624EA0055 - Items Less Than $5 Million (AMMO) Army UNCLASSIFIED Page 4 of 20 P-1 Line #31 Volume 1 - 794 === page 827 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2624EA0055 / Items Less Than $5 Million (AMMO) Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 50 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E00100 / CTG 10 GAUGE BLANK MDAP/MAIS Code: Resource Summary Prior Years FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - - Gross/Weapon System Cost ($ in Millions) 1.613 0.225 0.800 - - - Less PY Advance Procurement ($ in Millions) - - - - - - 1.613 0.225 0.800 - - - - - - - - - 1.613 0.225 0.800 - - - Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE ROUND 0.90 1.371 2.31 50,000 0.116 4.50 0.717 - - - - - - - - - Subtotal: Recurring Cost - - 1.371 - - 0.116 - - 0.717 - - - - - - - - - - - 1.371 - - 0.116 - - 0.717 - - - - - - - - - Subtotal: Hardware Cost 1,523,388 159,438 Support - Production Engineering Cost Production Engineering - - 0.242 - - 0.110 - - 0.083 - - - - - - - - - Subtotal: Support Production Engineering Cost - - 0.242 - - 0.110 - - 0.083 - - - - - - - - - Gross/Weapon System Cost - - 1.613 - - 0.225 - - 0.800 - - - - - - - - - Remarks: FY 2026 was a One-time buy to satisfy inventory obsolescence on CTG 10 Gauge Blank. LI 2624EA0055 - Items Less Than $5 Million (AMMO) Army UNCLASSIFIED Page 5 of 20 P-1 Line #31 Volume 1 - 795 === page 828 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2624EA0055 / Items Less Than $5 Million (AMMO) Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 50 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E00300 / CARTRIDGE 12 GAUGE SHOTGUN 7 1/2 CHILLED SHOT [A014] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 0.339 0.007 0.007 0.013 - 0.013 - - - - - - 0.339 0.007 0.007 0.013 - 0.013 - - - - - - 0.339 0.007 0.007 0.013 - 0.013 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 0.32 Subtotal: Recurring Cost - ROUND Subtotal: Hardware Cost 696,184 0.225 0.42 12,240 0.005 0.42 9,818 0.004 0.42 19,138 0.008 - - - 0.42 19,138 0.008 - 0.225 - - 0.005 - - 0.004 - - 0.008 - - - - - 0.008 - 0.225 - - 0.005 - - 0.004 - - 0.008 - - - - - 0.008 Support - Production Engineering Cost Production Engineering - - 0.114 - - 0.002 - - 0.003 - - 0.005 - - - - - 0.005 Subtotal: Support Production Engineering Cost - - 0.114 - - 0.002 - - 0.003 - - 0.005 - - - - - 0.005 Gross/Weapon System Cost - - 0.339 - - 0.007 - - 0.007 - - 0.013 - - - - - 0.013 Remarks: FY 2027 request increased to meet munitions / war stock requirement. (†) indicates the presence of a P-5a LI 2624EA0055 - Items Less Than $5 Million (AMMO) Army UNCLASSIFIED Page 6 of 20 P-1 Line #31 Volume 1 - 796 === page 829 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 50 Cost Elements COMPLETE ROUND COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 2624EA0055 / Items Less Than $5 Million (AMMO) Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 OLIN WINCHESTER LLC / EAST ALTON, IL Option / FFP ROCK ISLAND ARSENAL, IL Jul 2025 Dec 2025 12,240 0.42 Y 2026 OLIN WINCHESTER LLC / EAST ALTON, IL Option / FFP ROCK ISLAND ARSENAL, IL Jun 2026 Dec 2026 9,818 0.42 Y 2027 TO BE SELECTED / TO BE SELECTED C / FFP ROCK ISLAND ARSENAL, IL Jun 2027 Dec 2027 19,138 0.42 Y LI 2624EA0055 - Items Less Than $5 Million (AMMO) Army Location of PCO Item Number / Title [DODIC]: E00300 / CARTRIDGE 12 GAUGE SHOTGUN 7 1/2 CHILLED SHOT [A014] UNCLASSIFIED Page 7 of 20 P-1 Line #31 (Each) RFP Issue Date Volume 1 - 797 === page 830 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2624EA0055 / Items Less Than $5 Million (AMMO) Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 50 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E01700 / CTG, .22cal Ball Long Rifle Match, f/Rifle [A091] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 7.661 0.043 - 0.103 - 0.103 - - - - - - 7.661 0.043 - 0.103 - 0.103 - - - - - - 7.661 0.043 - 0.103 - 0.103 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Qty ($) FY 2025 Total Cost (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 0.29 Subtotal: Recurring Cost - Production Engineering Subtotal: Support Production Engineering Cost ROUND Subtotal: Hardware Cost 21,727,808 6.389 0.20 70,000 0.014 - - - 0.23 - 6.388 - - 0.014 - - - - - 6.388 - - 0.014 - - - - - - 1.258 - - 0.024 - - - - - 1.258 - - 0.024 - - 429,279 0.098 - - - 0.23 429,279 0.098 - 0.098 - - - - - 0.098 - 0.098 - - - - - 0.098 - - 0.005 - - - - - 0.005 - - - 0.005 - - - - - 0.005 Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.014 - - 0.005 - - - - - - - - - - - - Subtotal: Support - Quality Assurance Cost - - 0.014 - - 0.005 - - - - - - - - - - - - Gross/Weapon System Cost - - 7.661 - - 0.043 - - - - - 0.103 - - - - - 0.103 Remarks: FY 2027 request increased to meet munitions / war stock requirement. Item procured via a skip-year acquisition strategy. (†) indicates the presence of a P-5a LI 2624EA0055 - Items Less Than $5 Million (AMMO) Army UNCLASSIFIED Page 8 of 20 P-1 Line #31 Volume 1 - 798 === page 831 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 50 Cost Elements COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 2624EA0055 / Items Less Than $5 Million (AMMO) Method/Type or Funding Vehicle Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Jun 2025 Apr 2026 70,000 0.20 Y 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Oct 2027 429,279 0.23 Y LI 2624EA0055 - Items Less Than $5 Million (AMMO) Army Location of PCO Item Number / Title [DODIC]: E01700 / CTG, .22cal Ball Long Rifle Match, f/Rifle [A091] UNCLASSIFIED Page 9 of 20 P-1 Line #31 (Each) RFP Issue Date Volume 1 - 799 === page 832 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2624EA0055 / Items Less Than $5 Million (AMMO) Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 50 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E03001 / CTG, .30cal Blank, M1909, Single [A222] MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 35.085 1.945 1.976 1.440 - 1.440 - - - - - - 35.085 1.945 1.976 1.440 - 1.440 - - - - - - 35.085 1.945 1.976 1.440 - 1.440 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Qty ($) FY 2025 Total Cost (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 3.94 Subtotal: Recurring Cost - Production Engineering Subtotal: Support Production Engineering Cost ROUND Subtotal: Hardware Cost 8,242,155 32.502 0.50 - 32.499 - - 32.499 - - - 2.314 - - 3,189,280 1.602 0.54 - 1.602 - - 1.602 - - - 0.338 2.314 - - 2,347,406 1.268 0.55 - 1.268 - - 1.268 - - - 0.698 0.338 - - 1,507,015 0.829 - - - 0.55 1,507,015 0.829 - 0.829 - - - - - 0.829 - 0.829 - - - - - 0.829 - - 0.606 - - - - - 0.606 0.698 - - 0.606 - - - - - 0.606 Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.275 - - 0.005 - - 0.005 - - 0.005 - - - - - 0.005 Subtotal: Support - Quality Assurance Cost - - 0.275 - - 0.005 - - 0.005 - - 0.005 - - - - - 0.005 Gross/Weapon System Cost - - 35.085 - - 1.945 - - 1.976 - - 1.440 - - - - - 1.440 (†) indicates the presence of a P-5a LI 2624EA0055 - Items Less Than $5 Million (AMMO) Army UNCLASSIFIED Page 10 of 20 P-1 Line #31 Volume 1 - 800 === page 833 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 50 Cost Elements COMPLETE ROUND COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 2624EA0055 / Items Less Than $5 Million (AMMO) Method/Type or Funding Vehicle Award Date Date of First Delivery (Each) Qty Specs Date Unit Cost Avail Revision Now? Available ($) FY Contractor and Location 2025 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Jun 2025 Oct 2025 3,189,280 0.50 Y 2026 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2026 Oct 2026 2,347,406 0.54 Y 2027 OLIN WINCHESTER, LLC LCAAP / INDEPENDENCE, MO Option / FFP ROCK ISLAND ARSENAL, IL Mar 2027 Oct 2027 1,507,015 0.55 Y LI 2624EA0055 - Items Less Than $5 Million (AMMO) Army Location of PCO Item Number / Title [DODIC]: E03001 / CTG, .30cal Blank, M1909, Single [A222] UNCLASSIFIED Page 11 of 20 P-1 Line #31 RFP Issue Date Volume 1 - 801 === page 834 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2624EA0055 / Items Less Than $5 Million (AMMO) Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 50 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E03710 / CTG, .338CAL NORMA MAGNUM, AP, M1162 F/RIFLE MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 13.112 5.631 3.267 3.321 - 3.321 - - - - - - 13.112 5.631 3.267 3.321 - 3.321 - - - - - - 13.112 5.631 3.267 3.321 - 3.321 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 10.01 12.353 10.03 Subtotal: Recurring Cost - - 12.353 - - 12.353 - Production Engineering Subtotal: Support Production Engineering Cost - - 0.740 - - Quality Assurance - Subtotal: Support - Quality Assurance Cost - ROUND Subtotal: Hardware Cost 1,233,711 541,130 5.428 10.54 - 5.428 - - 5.428 - - - 0.203 0.740 - - - 0.018 - - 0.018 - 288,718 3.043 10.76 - 3.043 - - 3.043 - - - 0.222 0.203 - - - - - - - - 275,630 2.967 - - - 10.76 275,630 2.967 - 2.967 - - - - - 2.967 - 2.967 - - - - - 2.967 - - 0.354 - - - - - 0.354 0.222 - - 0.354 - - - - - 0.354 - - - - - - - - - - - - - - - - - - - - - - Support - Production Engineering Cost Support - Quality Assurance Cost Support - Undistributed Procurement Cost Undistributed Procurement - - 0.001 - - - - - - - - - - - - - - - Subtotal: Support Undistributed Procurement Cost - - 0.001 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 13.112 - - 5.631 - - 3.267 - - 3.321 - - - - - 3.321 LI 2624EA0055 - Items Less Than $5 Million (AMMO) Army UNCLASSIFIED Page 12 of 20 P-1 Line #31 Volume 1 - 802 === page 835 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 50 P-1 Line Item Number / Title: 2624EA0055 / Items Less Than $5 Million (AMMO) ID Code (A=Service Ready, B=Not Service Ready) : A (†) Item Number / Title [DODIC]: E03710 / CTG, .338CAL NORMA MAGNUM, AP, M1162 F/RIFLE MDAP/MAIS Code: indicates the presence of a P-5a LI 2624EA0055 - Items Less Than $5 Million (AMMO) Army UNCLASSIFIED Page 13 of 20 P-1 Line #31 Volume 1 - 803 === page 836 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 50 Cost Elements COMPLETE ROUND COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 2624EA0055 / Items Less Than $5 Million (AMMO) Item Number / Title [DODIC]: E03710 / CTG, .338CAL NORMA MAGNUM, AP, M1162 F/RIFLE FY Contractor and Location Method/Type or Funding Vehicle 2025 SIG SAUER, INC. / NEWINGTON, NH Option / FFP PICATINNY ARSENAL, NJ Jun 2025 Mar 2026 541,130 10.03 Y 2026 SIG SAUER, INC. / NEWINGTON, NH Option / FFP PICATINNY ARSENAL, NJ Mar 2026 Oct 2026 288,718 10.54 Y 2027 SIG SAUER, INC. / NEWINGTON, NH Option / FFP PICATINNY ARSENAL, NJ Jun 2027 Mar 2028 275,630 10.76 Y LI 2624EA0055 - Items Less Than $5 Million (AMMO) Army Location of PCO UNCLASSIFIED Page 14 of 20 Award Date Date of First Delivery (Each) P-1 Line #31 Qty Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date Volume 1 - 804 === page 837 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2624EA0055 / Items Less Than $5 Million (AMMO) Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 50 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E03715 / CTG, .300CAL NORMA MAGNUM, M1163 F/RIFLE MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 14.201 3.847 3.976 3.353 - 3.353 - - - - - - 14.201 3.847 3.976 3.353 - 3.353 - - - - - - 14.201 3.847 3.976 3.353 - 3.353 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Qty ($) FY 2025 Total Cost (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost COMPLETE (†) 2.56 Subtotal: Recurring Cost - Production Engineering Subtotal: Support Production Engineering Cost ROUND Subtotal: Hardware Cost 5,081,546 13.009 2.63 - 13.009 - - 13.009 - - - 1.182 - - 1,234,200 3.246 2.77 - 3.246 - - 3.246 - - - 0.601 1.182 - - 1,250,468 3.464 2.83 - 3.464 - - 3.464 - - - 0.512 0.601 - - 1,069,307 3.026 - - - 2.83 1,069,307 3.026 - 3.026 - - - - - 3.026 - 3.026 - - - - - 3.026 - - 0.327 - - - - - 0.327 0.512 - - 0.327 - - - - - 0.327 Support - Production Engineering Cost Support - Quality Assurance Cost Quality Assurance - - 0.013 - - - - - - - - - - - - - - - Subtotal: Support - Quality Assurance Cost - - 0.013 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 14.201 - - 3.847 - - 3.976 - - 3.353 - - - - - 3.353 (†) indicates the presence of a P-5a LI 2624EA0055 - Items Less Than $5 Million (AMMO) Army UNCLASSIFIED Page 15 of 20 P-1 Line #31 Volume 1 - 805 === page 838 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 50 Cost Elements COMPLETE ROUND COMPLETE ROUND COMPLETE ROUND O O C P-1 Line Item Number / Title: 2624EA0055 / Items Less Than $5 Million (AMMO) Item Number / Title [DODIC]: E03715 / CTG, .300CAL NORMA MAGNUM, M1163 F/RIFLE FY Contractor and Location Method/Type or Funding Vehicle 2025 SIG SAUER, INC. / NEWINGTON, NH Option / FFP PICATINNY ARSENAL, NJ Jun 2025 Mar 2026 1,234,200 2.63 Y 2026 SIG SAUER, INC. / NEWINGTON, NH Option / FFP PICATINNY ARSENAL, NJ Jun 2026 Mar 2027 1,250,468 2.77 Y 2027 SIG SAUER, INC. / NEWINGTON, NH Option / FFP PICATINNY ARSENAL, NJ Jun 2027 Mar 2028 1,069,307 2.83 Y LI 2624EA0055 - Items Less Than $5 Million (AMMO) Army Location of PCO UNCLASSIFIED Page 16 of 20 Award Date Date of First Delivery (Each) Qty P-1 Line #31 Specs Date Unit Cost Avail Revision Now? Available ($) RFP Issue Date Volume 1 - 806 === page 839 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2624EA0055 / Items Less Than $5 Million (AMMO) Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 50 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E99101 / Special Training Ammo: MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 37.659 0.761 0.759 0.764 - 0.764 - - - - - - 37.659 0.761 0.759 0.764 - 0.764 - - - - - - 37.659 0.761 0.759 0.764 - 0.764 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Support - Training Cost - - 37.659 - - 0.761 - - 0.759 - - 0.764 - - - - - 0.764 Subtotal: Support - Training Cost Services - - 37.659 - - 0.761 - - 0.759 - - 0.764 - - - - - 0.764 Gross/Weapon System Cost - - 37.659 - - 0.761 - - 0.759 - - 0.764 - - - - - 0.764 Remarks: FY 2027 base funds in the amount of $0.764 million support Unit training requirements across various Army Units. Authorizations issued under this program vary on an annual basis and are reviewed/updated during semi-annual Army Munitions Requirements Working Groups and Councils of Colonels. LI 2624EA0055 - Items Less Than $5 Million (AMMO) Army UNCLASSIFIED Page 17 of 20 P-1 Line #31 Volume 1 - 807 === page 840 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2624EA0055 / Items Less Than $5 Million (AMMO) Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 50 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: E99222 / Foreign Weapons Training Ammunition MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 3.403 0.515 0.512 0.515 - 0.515 - - - - - - 3.403 0.515 0.512 0.515 - 0.515 - - - - - - 3.403 0.515 0.512 0.515 - 0.515 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Hardware 2.564 1.16 0.356 1.18 0.351 1.20 0.348 - - - 1.20 - - 2.564 - - 0.356 - - 0.351 - - 0.348 - - - - - 0.348 - - 2.564 - - 0.356 - - 0.351 - - 0.348 - - - - - 0.348 Acceptance Test - - 0.653 - - 0.107 - - 0.109 - - 0.111 - - - - - 0.111 Subtotal: Support Acceptance Testing Cost - - 0.653 - - 0.107 - - 0.109 - - 0.111 - - - - - 0.111 Subtotal: Recurring Cost Subtotal: Hardware Cost 1.09 2,348,310 306,810 297,236 289,594 289,594 0.348 Support - Acceptance Testing Cost Support - Production Engineering Cost Production Engineering - - 0.186 - - 0.051 - - 0.052 - - 0.056 - - - - - 0.056 Subtotal: Support Production Engineering Cost - - 0.186 - - 0.051 - - 0.052 - - 0.056 - - - - - 0.056 Gross/Weapon System Cost - - 3.403 - - 0.515 - - 0.512 - - 0.515 - - - - - 0.515 Remarks: FY 2027 base funds in the amount of $0.515M procures and tests Foreign (Non-NATO) Weapons Training Ammunition in support of Regionally Aligned Forces (RAF). LI 2624EA0055 - Items Less Than $5 Million (AMMO) Army UNCLASSIFIED Page 18 of 20 P-1 Line #31 Volume 1 - 808 === page 841 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2624EA0055 / Items Less Than $5 Million (AMMO) Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 50 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: EA0600 / AMMUNITION PROGRAM SUPPORT MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 95.493 4.287 3.974 5.242 - 5.242 - - - - - - 95.493 4.287 3.974 5.242 - 5.242 - - - - - - 95.493 4.287 3.974 5.242 - 5.242 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Support - Single Manager for Conventional Ammunition (SMCA) Cost SMCA Management - - 95.493 - - 4.287 - - 3.974 - - 5.242 - - - - - 5.242 Subtotal: Support - Single Manager for Conventional Ammunition (SMCA) Cost - - 95.493 - - 4.287 - - 3.974 - - 5.242 - - - - - 5.242 Gross/Weapon System Cost - - 95.493 - - 4.287 - - 3.974 - - 5.242 - - - - - 5.242 Remarks: FY 2027 funds provides mission essential systems and services which are required to be provided by the Army as the Single Manager for Conventional Ammunition. LI 2624EA0055 - Items Less Than $5 Million (AMMO) Army UNCLASSIFIED Page 19 of 20 P-1 Line #31 Volume 1 - 809 === page 842 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 2624EA0055 / Items Less Than $5 Million (AMMO) Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 50 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: EA0960 / USAMTU FT BENNING MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 46.043 1.536 1.528 1.539 - 1.539 - - - - - - 46.043 1.536 1.528 1.539 - 1.539 - - - - - - 46.043 1.536 1.528 1.539 - 1.539 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Support - Training Cost - - 46.043 - - 1.536 - - 1.528 - - 1.539 - - - - - 1.539 Subtotal: Support - Training Cost Services - - 46.043 - - 1.536 - - 1.528 - - 1.539 - - - - - 1.539 Gross/Weapon System Cost - - 46.043 - - 1.536 - - 1.528 - - 1.539 - - - - - 1.539 Remarks: FY 2027 funds procures non-standard and commercially available specialty munitions and energetic materiel in support of Army Marksmanship Unit training requirements. LI 2624EA0055 - Items Less Than $5 Million (AMMO) Army UNCLASSIFIED Page 20 of 20 P-1 Line #31 Volume 1 - 810 === page 843 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 4370EA0575 / Ammunition Peculiar Equipment Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 50: Miscellaneous Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 3.283 16.219 14.007 - 14.007 17.638 15.213 13.933 13.717 - 419.389 419.389 419.389 To FY 2031 Complete - - - - - - - - - - 3.283 16.219 14.007 - 14.007 17.638 15.213 13.933 13.717 - - - - - - - - - - - 3.283 16.219 14.007 - 14.007 17.638 15.213 13.933 13.717 - Total 513.399 513.399 513.399 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Ammunition Peculiar Equipment (APE) program provides a vast array of equipment and support for ammunition operations including surveillance, demilitarization, maintenance, refurbishment, modification, packaging, and preservation per Army Regulation 700-20. This program is developed, acquired, and supervised through the Single Manager for Conventional Ammunition per DoDI 5160.68. APE provides equipment items specifically designed, fabricated, procured, tested, and adopted for use in worldwide United States military ammunition depot operations on conventional ammunition. APE maintains a central source of standard, modern, safe, efficient, reliable, and environmentally acceptable equipment for ammunition operations. The APE mission is critical to all Organic Demilitarization Operations, and is utilized to demilitarize ammunition items into components, sorts and removes hazardous materials to reduce human interaction and improves personnel safety. Demilitarization APE items perform disassembly, incineration, deformation, shredding and other processes. APE supporting Maintenance is designed to perform cleaning and renovation functions on ammunition subjected to deterioration effects (rust, corrosion, weathering, etc.) during its storage life. APE supporting Surveillance are key to stockpile sampling and functional testing of the items to assure readiness for combat or training. The APE program also supports warehouse operations at the APE National Inventory Control Point (NICP), executing the movement (receiving and shipment) of APE equipment worldwide. LI 4370EA0575 - Ammunition Peculiar Equipment Army UNCLASSIFIED Page 1 of 4 P-1 Line #32 Volume 1 - 811 === page 844 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 4370EA0575 / Ammunition Peculiar Equipment Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 50: Miscellaneous ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 EA0575 / Ammunition Peculiar Equipment - / 419.389 - / 3.283 - / 16.219 - / 14.007 - / - - / 14.007 P-40 Total Gross/Weapon System Cost - / 419.389 - / 3.283 - / 16.219 - / 14.007 - / - - / 14.007 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Base procurement dollars in the amount of $14.007 million will be used to procure, repair, modify and refurbish Ammunition Peculiar Equipment (APE) to assist in the maintenance, surveillance, and demilitarization missions at United States depots worldwide. APE is required to support the Ammunition Stockpile Reliability Program, Surveillance Program, equipment for worldwide maintenance and demilitarization, and Government-Owned, Contractor-Operated plants as Government Furnished Equipment. APE items maintain and verify the quality of the ammunition stockpile; thereby saving the cost of purchasing new replacement ammunition. APE proficiently executes the ammunition demilitarization mission to safely perform disassembly, destruction, or removal processes with an emphasis on recycling, reutilization and preserving demilitarization assets in a manner that supports ammunition sustainment, safety, and environmental compliance. The APE program provides global support to the US Military Services for ammunition sustainment and demilitarization operations, including deployment, operations, and support of the Ammunition Supply Points (ASP) suites. The ASP suites include APE, which will increase the efficiency of the receipt, inspection, and issuance of ammunition to the warfighter. Deployment of APE to support ASP suites increases efficiencies for ammunition sustainment operations by reducing logistics burdens and related risks. This allows for better primary mission readiness, enhanced hazardous operations safety and more efficient operating conditions requiring less ammunition retrograde/demilitarization by providing capability to preserve ammunition assets to increase warfighter readiness and reduce waste. LI 4370EA0575 - Ammunition Peculiar Equipment Army UNCLASSIFIED Page 2 of 4 P-1 Line #32 Volume 1 - 812 === page 845 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4370EA0575 / Ammunition Peculiar Equipment Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 50 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: EA0575 / Ammunition Peculiar Equipment MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 3.283 16.219 14.007 - 14.007 - Gross/Weapon System Cost ($ in Millions) 419.389 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 419.389 Plus CY Advance Procurement ($ in Millions) - - - - - 3.283 16.219 14.007 - 14.007 - Total Obligation Authority ($ in Millions) 419.389 FY 2027 Total - - - - - 3.283 16.219 14.007 - 14.007 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Support - Contractor Logistics Support (CLS) Cost Oversight Subtotal: Support Contractor Logistics Support (CLS) Cost - - 10.869 - - 1.096 - - 2.217 - - 2.016 - - - - - 2.016 - - 10.869 - - 1.096 - - 2.217 - - 2.016 - - - - - 2.016 - - 21.828 - - 0.764 - - 3.771 - - 4.215 - - - - - 4.215 - - 21.828 - - 0.764 - - 3.771 - - 4.215 - - - - - 4.215 - - 57.393 - - 0.358 - - 1.030 - - 1.865 - - - - - 1.865 - - 57.393 - - 0.358 - - 1.030 - - 1.865 - - - - - 1.865 Support - Fielding Cost Fielding Subtotal: Support - Fielding Cost Support - Initial Spares and Repair Parts Cost Initial Spares and Repair Parts Subtotal: Support - Initial Spares and Repair Parts Cost Support - Peculiar Support Equipment Cost Test and Measurement Equipment - - 61.307 - - 0.543 - - 2.989 - - 4.030 - - - - - 4.030 Support and Handling Equipment - - - - - - - - 4.525 - - - - - - - - - Subtotal: Support - Peculiar Support Equipment Cost - - 61.307 - - 0.543 - - 7.514 - - 4.030 - - - - - 4.030 - - 9.785 - - 0.522 - - 1.687 - - 0.500 - - - - - 0.500 Support - Product Improvement Cost Safety LI 4370EA0575 - Ammunition Peculiar Equipment Army UNCLASSIFIED Page 3 of 4 P-1 Line #32 Volume 1 - 813 === page 846 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4370EA0575 / Ammunition Peculiar Equipment Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 50 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: EA0575 / Ammunition Peculiar Equipment MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Subtotal: Support - Product Improvement Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - 9.785 - - 0.522 - - 1.687 - - 0.500 - - - - - 0.500 Recapitalization - - 232.189 - - - - - - - - 0.690 - - - - - 0.690 Subtotal: Support Recapitalization Cost - - 232.189 - - - - - - - - 0.690 - - - - - 0.690 Support - Recapitalization Cost Support - Staging and Transportation Cost Staging and Transportation - - 26.018 - - - - - - - - 0.691 - - - - - 0.691 Subtotal: Support - Staging and Transportation Cost - - 26.018 - - - - - - - - 0.691 - - - - - 0.691 Gross/Weapon System Cost - - 419.389 - - 3.283 - - 16.219 - - 14.007 - - - - - 14.007 LI 4370EA0575 - Ammunition Peculiar Equipment Army UNCLASSIFIED Page 4 of 4 P-1 Line #32 Volume 1 - 814 === page 847 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 4758EA0550 / First Destination Transportation (AMMO) Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 50: Miscellaneous Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 1,070.916 1,070.916 1,070.916 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 19.514 18.600 18.712 - 18.712 18.693 18.861 18.841 19.031 - - - - - - - - - - - 19.514 18.600 18.712 - 18.712 18.693 18.861 18.841 19.031 - - - - - - - - - - - 19.514 18.600 18.712 - 18.712 18.693 18.861 18.841 19.031 - Total 1,203.168 1,203.168 1,203.168 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: First Destination Transportation (FDT), as outlined in the Department of War's Financial Management Regulation (FMR) 7000.14-R Volume 2A, Chapter 1, Para 010205, is that "transportation required to deliver new, an upgraded model, or recapitalized production items from the manufacturer's plant or source of procurement to the first point of delivery where the Military Service or Defense Agency takes possession and/ or ownership of that item. The procurement source, as used herein, is any supplier outside the DoW supply system or any DoW industrial activity that fabricates new materiel. The procurement source or the first point of delivery may be in the Continental United States (CONUS) or overseas." LI 4758EA0550 - First Destination Transportation (AMMO) Army UNCLASSIFIED Page 1 of 3 P-1 Line #33 Volume 1 - 815 === page 848 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 4758EA0550 / First Destination Transportation (AMMO) Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 50: Miscellaneous ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 EA0550 / First Destination Transportation (AMMO) - / 1,070.916 - / 19.514 - / 18.600 - / 18.712 - / - - / 18.712 P-40 Total Gross/Weapon System Cost - / 1,070.916 - / 19.514 - / 18.600 - / 18.712 - / - - / 18.712 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 base funding of $18.712 million is required to support the distribution of Army ammunition end items and components in accordance with FMR 7000.14-R, Volume 2A, Chapter 1, Para 010205 (Interim Transportation). Distribution originates from and to CONUS and overseas manufacturing plants/contractors and/or assembly points (e.g., Army Ammunition Plants, Arsenals, Depots, Contract Management Centers to include Off-shore Procurement Contractors shipping under Free On-board (FOB) shipping origin terms). Requirements are either destined for CONUS depots for acceptance into the Army Supply System, to CONUS customers, to CONUS Arsenals, or to ports of embarkation in support of the Call Forward Program (i.e., Training, War Reserve, or the Overseas Contingency Operations). Funding requirements for this effort promotes readiness and are forecasted based on the overall hardware procurement projections across the Army in a given fiscal year along with associated shipping costs. Funding promotes readiness and supports planned Army Ammunition procurements to avoid failing to meet FOB Origin delivery terms across ammunition contracts. LI 4758EA0550 - First Destination Transportation (AMMO) Army UNCLASSIFIED Page 2 of 3 P-1 Line #33 Volume 1 - 816 === page 849 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4758EA0550 / First Destination Transportation (AMMO) Appropriation / Budget Activity / Budget Sub Activity: 2034A / 01 / 50 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: EA0550 / First Destination Transportation (AMMO) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 19.514 18.600 18.712 - 18.712 - Gross/Weapon System Cost ($ in Millions) 1,070.916 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 1,070.916 Plus CY Advance Procurement ($ in Millions) - - - - - 19.514 18.600 18.712 - 18.712 - Total Obligation Authority ($ in Millions) 1,070.916 FY 2027 Total - - - - - 19.514 18.600 18.712 - 18.712 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Support - Staging and Transportation Cost Staging and Transportation - - 1,070.916 - - 19.514 - - 18.600 - - 18.712 - - - - - 18.712 Subtotal: Support - Staging and Transportation Cost - - 1,070.916 - - 19.514 - - 18.600 - - 18.712 - - - - - 18.712 Gross/Weapon System Cost - - 1,070.916 - - 19.514 - - 18.600 - - 18.712 - - - - - 18.712 Remarks: FY 2027 funding is necessary to support planned Army Ammunition procurements; while helping to avoid penalties and impacts such as failing to meet Free On-Board (FOB) origin delivery terms across ammunition contracts, contract cost growth due to increased storage penalties exceeding shipment costs, and production shutdowns at contractor facilities due to shipment bottlenecks. LI 4758EA0550 - First Destination Transportation (AMMO) Army UNCLASSIFIED Page 3 of 3 P-1 Line #33 Volume 1 - 817 === page 850 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 9615EA8500 / Closeout Liabilities Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 01: Ammunition / BSA 50: Miscellaneous Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 0.978 0.082 0.102 0.101 - 0.101 0.102 0.102 0.102 0.103 - 1.672 Total - - - - - - - - - - - - 0.978 0.082 0.102 0.101 - 0.101 0.102 0.102 0.102 0.103 - 1.672 - - - - - - - - - - - - 0.978 0.082 0.102 0.101 - 0.101 0.102 0.102 0.102 0.103 - 1.672 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: Funding will pay contract termination cost and operational losses/claims at ammunition plants. This funding ensures unanticipated future contract liabilities can be satisfied in accordance with Army Contract Review Board (ACRB) approved actions. Justification: FY 2027 base procurement dollars of $0.101 million are required to pay contingent liabilities such as contract termination cost, e.g., unfunded pension liabilities, severance pay, and other claims approved by the ACRB. LI 9615EA8500 - Closeout Liabilities Army UNCLASSIFIED Page 1 of 1 P-1 Line #34 Volume 1 - 818 === page 851 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 02: Ammunition Production Base Support / BSA 10: Production Base Support P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 15,170.002 15,170.002 15,170.002 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 1,225.605 1,225.605 1,225.605 2,045.845 2,045.845 2,045.845 2,331.763 - - 2,331.763 - 2,331.763 - - 2,331.763 - 2,331.763 - 2,331.763 1,397.004 1,397.004 1,397.004 1,416.070 1,416.070 1,416.070 1,574.735 1,574.735 1,574.735 To FY 2031 Complete 1,411.163 1,411.163 1,411.163 Total - 26,572.187 - 26,572.187 - 26,572.187 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The FY 2026 spend plan amount for Industrial Facilities includes $2,045,845 thousand of discretionary and $257,000 thousand of mandatory (reconciliation) for a total of $2,302,845 thousand. This budget line provides funding for modernization, construction and rehabilitation efforts at Government-Owned, Contractor-Operated (GOCO) Army Ammunition Plants (AAPs) and commercial facilities as well as Government-Owned, Government-Operated (GOGO) facilities that produce conventional ammunition. This budget line also provides funding for the preservation of inactive production lines at the AAPs. The AAPs were constructed during World War II; the facilities have served and supported numerous theater operations, providing the warfighter with expansive ammunition requirements. Due to their age, the facilities and infrastructure experience frequent failures, and the production lines operate with outdated technology processes and equipment. The Industrial Facilities (IF) budget line consists of three separate programs, Provision of Industrial Facilities (PIF), Layaway of Industrial Facilities (LIF) and Maintenance of Inactive Facilities (MIF). Its mission includes replacement of obsolete or worn production equipment, correction of deficiencies and upgrades to infrastructures. This line represents an enduring, exhaustive mission to modernize and equip the Army's Ammunition Plants and provide decisive advantage of the warfighter's conventional ammunition, explosives and propellant requirements, without delay and at optimal cost. Project Lead (PL) Joint Services, under Joint Capability Program Executive Ammunition and Energetics, manages the Industrial Facilities budget line. The Provision of Industrial Facilities program (PIF), SSN EP1200, establishes, augments and improves ammunition production capabilities through strategic modernization efforts, expands production capacity, maintains regulatory compliance, and improves quality of work environment and safety at ammunition plants. It also addresses emergency modernization and associated construction to mitigate production disruptions at various sites and rapidly accelerate replenishment of critical munitions stocks provided to US allies. This budget line provides funding for preservation, storage and movement of real property facilities and equipment required for anticipated future requirements at active and inactive Army ammunition installations including the Quad Cities Cartridge Case Facility (QCCCF) and Government-Owned, Government-Operated (GOGO) AAPs, also known as Layaway of Industrial Facilities (LIF) activities, SSN EP2000. Funding will also support consolidation of layaway production equipment and redistribution of production equipment that cannot be stored on-site. Layaway efforts also include retaining critical operational and technical knowledge of production equipment, such as engineering designs, process data and control manufacturing practices. Layaway program also includes safety-related decontamination, disposal and demolition of production equipment and facilities, and site assessments. Procurement funds also support the Maintenance of Inactive Facilities (MIF), SSN EP1500, to include utilities, buildings, plant equipment, special tooling, and special test equipment being retained to support future production requirements at GOCO and GOGO AAPs and QCCCF. Additional efforts include support of associated MIF costs such as grounds maintenance, fire protection, equipment security, and administrative support. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 1 of 62 P-1 Line #35 Volume 1 - 819 === page 852 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 02: Ammunition Production Base Support / BSA 10: Production Base Support Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Project Schedule Exhibit Type Project Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) - 1,225.605 2,045.845 2,331.763 - 2,331.763 Holston Army Ammunition Plant - 106.368 384.800 770.000 - 770.000 P-25 5262992 - Facility Electrical Upgrades - - 11.400 - - - P-25 5XX3214 - Treatment Technology Alternatives to Open Burning - - 3.000 17.000 - 17.000 P-25 5273667 - Building Ventilation, Scrubber, and Containment Improvements - - - 24.000 - 24.000 P-25 5273668 - Sewer System Line Replacement Phase III - - - 13.644 - 13.644 P-25 5263928 - River Water Outfall 40 and Reservoir Modification - - 24.000 - - - P-25 5263981 - Wastewater General Upgrades - - 18.000 - - - P-25 5263982 - Sanitary Sewer Infrastructure Upgrades - - 11.000 - - - P-25 5263985 - IWWTF (Hydrogen Sulfide Emissions Treatment) - - 28.800 - - - P-25 5263986 - RDX Wastewater - Pump Station Upgrades - - 55.200 - - - P-25 5265096 - ANSOL Thermal Destruction, Construction - - 200.000 - - - P-25 5265114 - Lacquer Prep Facility Sustainment - - 1.600 - - - P-25 5XX5167 - Consolidated Compressed Air Facility, Construction - 12.900 24.000 - - P-25 5275267 - New Lacquer Prep Facility Design Build - - - P-25 5265285 - G-10 Process Improvements - - 7.800 - - - P-25 5255288 - PAX - 3 Production G Building Modernization & Construction - 8.050 - - - - P-25 5255289 - Secondary Process River Water Intake Facility Construction - 85.418 - - - - P-25 5275291 - Water Distribution Modernization - - - 50.356 - 50.356 (Uncategorized) P-25 5265293 - Explosive Production Modernization and Resiliency - Iowa Army Ammunition Plant - P-25 5263411 - Tank Line (Line 2) Sustainment - Phase II - P-25 5XX5030 - Future Artillery Complex - P-25 5275124 - Critical Yard C Upgrades - P-25 5265241 - Line 3A Sustainment P-25 5275247 - AMP and Hellfire Modernization, Phase 2 P-25 - 145.000 - 145.000 - 520.000 - 520.000 10.672 57.900 - 57.900 3.444 3.900 - 3.900 2.500 - - - - - 12.300 - 12.300 - - 4.728 - - - - - - 41.700 - 41.700 - - 313.650 280.650 5255304 - Relocation of 40mm Grenade and Spitback Pressing Operations - 33.000 Lake City Army Ammunition Plant - 258.585 476.745 235.209 - 235.209 P-25 5XX3356 - Small Caliber Modernization, 6.8mm Ammunition Production Facility - 161.345 236.800 132.420 - 132.420 P-25 5253360 - 7.62MM Reduced Range Ammunition Process Modernization and Construction - 55.290 - - - P-25 5253361 - New One Way Luminescence Ammo Facility Construction & Equipment - 33.950 - - - - P-25 5273777 - HVAC Instrument and Control Modernization - - - 2.789 - 2.789 P-25 5245233 - Automated Contaminated Waste Plant - 8.000 - - P-25 5265236 - Energetic Waste Incinerator: Construction - - LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 2 of 62 - 239.945 P-1 Line #35 100.000 - - - 100.000 Volume 1 - 820 === page 853 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 02: Ammunition Production Base Support / BSA 10: Production Base Support Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Project Schedule Exhibit Type Project Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Quad Cities Cartridge Case Facility - - - 6.500 - 5275414 - Batch Production Furnace Upgrades - - - 6.500 - 6.500 Radford Army Ammunition Plant - 56.200 860.725 - 860.725 P-25 5263557 - Electrical Distribution System Upgrades Phase IV - - 27.800 - - P-25 5265113 - Tie-Line Modernization - - 28.400 - - - P-25 5273847 - New NC Facility Hammer Mill Phase II - - - 30.000 - 30.000 P-25 5255328 - Hurricane Helene Restoration - 125.100 - - - - P-25 5253741 - Water Intake Pump Upgrades, Ph 2 - 20.894 - - - P-25 5275398 - Radford Operations & Performance Work Statements - - - 120.000 - 120.000 P-25 P-25 145.994 6.500 - - 5273801 - Radford New Operating Contractor Desired Upgrades - - - 710.725 - 710.725 Scranton Army Ammunition Plant - 6.026 4.500 23.200 - 23.200 P-25 5XX2985 - Electrical Upgrades Phase II - 2.766 - 15.000 - 15.000 P-25 5273144 - A-Bay (DC) Crane Replacement - - - 1.200 - 1.200 P-25 5275150 - Infrastructure Repairs - - - 7.000 - 7.000 P-25 5265193 - Forge Shop - Roof Repairs, Smog Hog Removal, & Rainwater Collection System - - 4.500 - - - P-25 5255185 - XM1113/1210 Modernization Upgrades - 3.260 - - - Various Army Ammunition Plants - 131.754 1,035.487 156.728 - 156.728 P-25 5XX0000 - Planning & Design in Support of Provision of Industrial Facilities - 86.601 90.987 124.428 - 124.428 P-25 5XX5405 - Quality of Work Environment Upgrades - 3.500 4.000 7.000 - 7.000 P-25 5XX5406 - Major Maintenance at GOCO AAPs - 31.653 37.500 25.300 - 25.300 P-25 5255172 - Alternative and Advanced Manufacturing Technology (AAMT) Efficiencies - 10.000 - - - - P-25 5265450 - Energetics Center of Excellence - - 903.000 - - - Yuma Proving Ground / Aberdeen Test Center - 0.794 0.795 0.798 - 0.798 P-25 - 5XX5060 - Replace Test Instrumentation in Production Acceptance Testing (Ammunition) - 0.794 0.795 0.798 - 0.798 Blue Grass Army Depot - 248.000 - 127.720 - 127.720 P-25 5255343 - Modular Artillery Production Facility - 248.000 - P-25 5275344 - Modernization and Infrastructure Upgrades - - - 127.720 - 127.720 McAlester Army Ammunition Plant - - - 30.000 - 30.000 5275351 - B-Line East Cast-Cure Mixer Systems - - - 30.000 - 30.000 Pine Bluff Arsenal - - - 14.349 - 14.349 5275345 - Infrastructure Upgrades and Improvements - - - 14.349 - 14.349 Various Army Ammunition Plants (GOGOs) - - 59.960 30.000 - 30.000 P-25 5275352 - Ammunition Operations and Production Sustainment at GOGOs - - - 30.000 - 30.000 P-25 5265451 - Resilient Energetics Manufacturing Capability - - 59.960 - - - P-25 P-25 LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 3 of 62 P-1 Line #35 - - - Volume 1 - 821 === page 854 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 02: Ammunition Production Base Support / BSA 10: Production Base Support Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Project Schedule Exhibit Type P-25 P-25 Project Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Maintenance of Inactive Facilities - 4.977 6.634 6.716 - 5XX4073 - Maintenance of Inactive Facilities - 4.977 6.634 6.716 - 6.716 Layaway Of Industrial Facilities - 9.457 10.052 11.918 - 11.918 5XX8000 - Layaway of Industrial Facilities - 9.457 10.052 11.918 - 11.918 - 1,225.605 2,045.845 2,331.763 - 2,331.763 Total Gross/Weapon System Cost 6.716 *For the P-17 and P-25, the Project column displays a three-level indentation: Project Category (e.g., Environmental), followed by the Facility, followed by the Project Name. Exhibits with no Project Category are included under the "Uncategorized" category. For the P-26, the Project column displays a two-level indentation: Project Type (e.g., Inactive Plants, Inactive Lines at Contractor Plants and Inactive Lines at Active Plants), followed by the Facility. Note also that although all P-17, P-25 and P-26 projects are shown in the project schedule, not all projects will have a corresponding exhibit. A P-17 or P-25 exhibit is only included if data beyond the Project Number, Project Title and Cost are included (for example: for the P-17, Description, Manufacturer, etc.; for the P-25, Narrative Explanation, Cost Elements, Principle Milestones, etc.). A P-26 exhibit is only included if data beyond Project Type and Total Cost are included (for example, Description, Contractor, Maintenance/Recurring/Environmental/Other costs, etc.). Justification: FY 2027 procurement dollars in the amount of $2,331.763 million will support modernization projects to include procurement and installation of a Nitrocellulose Hammermill at Radford Army Ammunition Plant (AAP); procurement of production equipment for the 6.8mm Ammunition Production Facility at Lake City AAP; and Relocate Advanced Multi-Purpose and Hellfire production at Iowa AAP. Program will also fund infrastructure improvements at all five (5) GOCOs to maintain production continuity. Additional efforts include, but not limited to, design, work environment projects, improvements for personnel safety and health, and emergent maintenance for all GOCOs, as well as Government-Owned, Government-Operated (GOGO) facilities that produce conventional ammunition. Funds will provide engineering support of industrial facilities, pre-design efforts for future-year modernization projects. FY 2027 funding also supports the protection and preservation of industrial facilities at active and inactive Army ammunition installations and equipment that is no longer required for current production but must be retained for future production needs. Funds support the decontamination and demolition of excess production equipment and facilities buildings at Holston, Iowa, Lake City, and Radford Army Ammunition Plants, and Pine Bluff Arsenal. FY 2027 funding supports the care and maintenance of layaway equipment and facilities at active and inactive ammunition installations. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 4 of 62 P-1 Line #35 Volume 1 - 822 === page 855 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Facility Electrical Upgrades Project Number: 5262992 Project Category: End Item Supported Model: Research Develop Expl (RDX), High Melt Expl (HMX), Insensitive Mun Expl (IMX) FY 2027 Base FY 2027 OOC FY 2027 Total Annual Capacity Before / After (1-8-5): / A. Construction Cost - 0.975 - - - Facility Name: Holston Army Ammunition Plant Facility Location: Kingsport, Tennessee Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - 8.350 - - - Principal Milestones Month & Year C. Equipment Installation Cost - 2.075 - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - Mar 2026 Mar 2028 Mar 2028 G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost - 11.400 - - - Cost Elements ($ in Millions) FY 2025 FY 2026 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 Base request. Procurement dollars supports facility electrical upgrades at Holston Army Ammunition Plant. Holston Army Ammunition Plant's main 138kV substation is facing significant challenges due to aging infrastructure with equipment dating back to the 1940s and voltage instability from the local utility. This results in both over- and under-voltage conditions impacting plant operations and potentially damaging sensitive equipment, including installed technology. Current primary fuses lack critical features like three-phase tripping, reset-ability, and remote operation, hindering efficient maintenance and increasing risk. The new substation transformers would include an integral load tap changers (LTC) which would automatically adjust the voltage to the appropriate value before feeding the 13.8kV distribution bus. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 5 of 62 P-1 Line #35 Volume 1 - 823 === page 856 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Treatment Technology Alternatives to Open Burning Project Number: 5XX3214 Project Category: End Item Supported Model: Research Develop Expl(RDX),High Melt Expl(HMX),Insensitive Mun Expl(IMX) FY 2027 Base FY 2027 OOC Annual Capacity Before / After (1-8-5): / FY 2027 Total A. Construction Cost - 1.500 4.500 - Facility Name: Holston Army Ammunition Plant Facility Location: Kingsport, Tennessee 4.500 Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - 1.500 8.000 - 8.000 Principal Milestones Month & Year C. Equipment Installation Cost - - 1.500 - D. Contractor Support Cost - - 1.500 - E. Corps of Engineers Support Cost - - 1.500 - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - 1.500 Concept Design Complete: 1.500 Final Design Complete: Initial/Final Project Award: 1.500 Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Apr 2023 Mar 2021 / Feb 2027 Jul 2027 Jul 2027 Aug 2027 Jan 2028 Total Project Cost - 3.000 17.000 - 17.000 Cost Elements ($ in Millions) FY 2025 FY 2026 Project Number Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars in the amount of $17.000 million supports equipping the lab for the Explosive Decomposition Chamber and Flashing Furnace operations at Holston Army Ammunition Plant (HSAAP). This project supports the Army's investments in explosive waste treatment capabilities at HSAAP that provide an alternative to open burning. These explosives contaminated materials are currently open burned at the installation. HSAAP is required to significantly reduce open burning of Material Potentially Presenting an Explosive Hazard (MPPEH) in compliance with Tennessee Department of Environment and Conservation (TDEC) requirements. The new Flashing Furnace facility will dispose of explosive waste generated during the explosives manufacturing process and thermally treats various explosives contaminated materials and some explosive wastes. In addition, this project supports the commissioning of a new Explosive Decomposition Chamber facility to provide environmental alternative to treat bulk explosives produced at HSAAP. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 6 of 62 P-1 Line #35 Volume 1 - 824 === page 857 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Building Ventilation, Scrubber, and Containment Improvements Project Number: 5273667 Project Category: End Item Supported Model: Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC FY 2027 Total FY 2025 FY 2026 A. Construction Cost - - 5.000 - Facility Name: Holston Army Ammunition Plant Facility Location: Kingsport, Tennessee 5.000 Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - 10.000 - 10.000 Principal Milestones C. Equipment Installation Cost - - 5.000 - D. Contractor Support Cost - - 4.000 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - 5.000 Concept Design Complete: 4.000 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 24.000 - 24.000 Cost Elements ($ in Millions) Project Number Month & Year Title Jun 2028 Mar 2027 Jan 2030 Jan 2030 Mar 2030 Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars in the amount of $24.000 improves ventilation and scrubber systems along with improving building containment of explosives materials. The particulate scrubber systems currently in use in various buildings at Holston Army Ammunition Plant (AAP) are outdated and require upgrades to ensure effective capture of explosive particulates. Implementing advanced scrubber technologies and improved ducting will enhance safety and minimize compliance risks within production buildings. Additionally, improving the containment of explosive materials is critical, as water is extensively used on production facility floors for hazard reduction and equipment washdowns. Upgrades to existing curbing and aprons, along with the construction of new containment systems, will better collect explosivecontaminated wastewater, mitigating safety concerns and preventing environmental release. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 7 of 62 P-1 Line #35 Volume 1 - 825 === page 858 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Sewer System Line Replacement Phase III Project Number: 5273668 Project Category: End Item Supported Model: Artillery and Mortars Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC FY 2027 Total FY 2025 FY 2026 A. Construction Cost - - 4.444 - Facility Name: Holston Army Ammunition Plant Facility Location: Kingsport, Tennessee 4.444 Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - 4.700 - 4.700 Principal Milestones Month & Year C. Equipment Installation Cost - - 3.700 - D. Contractor Support Cost - - 0.800 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - 3.700 Concept Design Complete: 0.800 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Feb 2027 Dec 2026 Sep 2028 Sep 2028 Sep 2028 Oct 2028 Total Project Cost - - 13.644 - 13.644 Cost Elements ($ in Millions) Project Number Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars in the amount of $13.644 million supports the Sewer System Line Replacement Phase III project at Holston Army Ammunition Plant (AAP). This overall, multi-phased project is a comprehensive modernization effort to rehabilitate and replace aging portions of the industrial and sanitary sewer systems at Holston AAP. This effort ensures reliable and safe conveyance of wastewater, preventing sanitary sewer overflows and potential environmental contamination. Phase I executed a comprehensive systems assessment, while Phase II targeted repairs completed in Phase I (addressing 30% of subsurface and 100% of surface defects). Phase III strategically focuses on additional critical repairs identified in the initial Sewer System Evaluation Survey. This phase expands the scope of work to include a wider range of pipe diameters and increased manhole rehabilitation. A key distinction of Phase III is the prioritization of repairs based on potential impact to production, ensuring the most critical vulnerabilities are addressed first. Proactively addressing these infrastructure deficiencies will reduce risks to personnel and the environment, avoid costly emergency repairs and operational disruptions, and ensure the long-term sustainability of wastewater management at Holston AAP. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 8 of 62 P-1 Line #35 Volume 1 - 826 === page 859 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: River Water Outfall 40 and Reservoir Modification Project Number: 5263928 Project Category: End Item Supported Model: Research Develop Expl (RDX), High Melt Expl (HMX), Insensitive Mun Expl (IMX) FY 2027 Base FY 2027 OOC FY 2027 Total Annual Capacity Before / After (1-8-5): / A. Construction Cost - 18.000 - - - Facility Name: Holston Army Ammunition Plant Facility Location: Kingsport, Tennessee Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - 5.000 - - - Principal Milestones Month & Year C. Equipment Installation Cost - 1.000 - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - Sep 2026 Sep 2027 Sep 2027 G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost - 24.000 - - - Cost Elements ($ in Millions) FY 2025 FY 2026 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 Base request. Procurement dollars supports construction modifications of the River Water Outfall 40 and upgrades to the River Water Reservoir system at Holston AAP. The reservoir stores water to provide back pressure to the River Water system and enable safe shutdown of operations in the event of an interruption of the River Water supply. Outfall 40 transports cooling water from the production buildings back to the Arnott Branch of the Holston River. The requirement for this change stipulates an Outfall cannot affect temperature of US waters by more than three degrees Celsius and as production capacity expands, the degree requirement will be exceeded. This effort will include creating a concrete channel parallel to Outfall 40, redirecting the pathway of Outfall 40 from feeding into the Arnott Branch of the Holston River and upgrade the river water reservoir system. This project will maintain compliance with the Clean Water Act and assure resiliency in supply of river water to production operations. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 9 of 62 P-1 Line #35 Volume 1 - 827 === page 860 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Wastewater General Upgrades Project Number: 5263981 Project Category: End Item Supported Model: Research Develop Expl (RDX), High Melt Expl (HMX), Insensitive Mun Expl (IMX) FY 2027 Base FY 2027 OOC FY 2027 Total Annual Capacity Before / After (1-8-5): / A. Construction Cost - 2.450 - - - Facility Name: Holston Army Ammunition Plant Facility Location: Kingsport, Tennessee Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - 11.500 - - - Principal Milestones Month & Year C. Equipment Installation Cost - 4.050 - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - Mar 2026 Sep 2027 Sep 2027 G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost - 18.000 - - - Cost Elements ($ in Millions) FY 2025 FY 2026 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 Base request. Procurement dollars supports modernization and upgrades to the Wastewater Treatment Facility at Holston Army Ammunition Plant (AAP). Project upgrades various areas within the Industrial Wastewater Treatment Facility (IWWTF) system to include point source treatment, upgrading equipment/ infrastructure, and replacing existing infrastructure that has reached its end of life, with an objective of maintaining effluent compliance. These efforts include installation of composite samplers across the Plant, upgrades to the electrical switch gear in the IWWTF, and infrastructure improvements in and around the IWWTF. This project will support increased explosive production, maintain environmental compliance, and ensure production continuity across all explosives at Holston AAP. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 10 of 62 P-1 Line #35 Volume 1 - 828 === page 861 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Sanitary Sewer Infrastructure Upgrades Project Number: 5263982 Project Category: End Item Supported Model: Research Develop Expl (RDX), High Melt Expl (HMX), Insensitive Mun Expl (IMX) FY 2027 Base FY 2027 OOC FY 2027 Total Annual Capacity Before / After (1-8-5): / A. Construction Cost - 3.100 - - - Facility Name: Holston Army Ammunition Plant Facility Location: Kingsport, Tennessee Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - 6.500 - - - Principal Milestones C. Equipment Installation Cost - 1.400 - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost - 11.000 - - - Cost Elements ($ in Millions) FY 2025 FY 2026 Month & Year Mar 2027 Sep 2028 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 Base request. Procurement dollars support sanitary sewer infrastructure upgrades at Holston Army Ammunition Plant (HSAAP). This project will upgrade the interconnection of a sewer pipeline from the existing sanitary wastewater collection system, redirecting the waste stream to the existing industrial sewer system for further treatment. HSAAP's IWWTF will benefit from additional organic material in the effluent, which is currently provided by supplemental carbon and can be provided by sanitary waste streams, to improve IWWTF bacteria development and improve overall wastewater treatment processes. This will also provide pretreatment of the sanitary waste before it is sent onward to the Industrial Wastewater Treatment Facility (IWWTF). LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 11 of 62 P-1 Line #35 Volume 1 - 829 === page 862 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: IWWTF (Hydrogen Sulfide Emissions Treatment) Project Number: 5263985 Project Category: End Item Supported Model: Research Develop Expl (RDX), High Melt Expl (HMX), Insensitive Mun Expl (IMX) FY 2027 Base FY 2027 OOC FY 2027 Total Annual Capacity Before / After (1-8-5): / A. Construction Cost - 12.500 - - - Facility Name: Holston Army Ammunition Plant Facility Location: Kingsport, Tennessee Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - 14.500 - - - Principal Milestones C. Equipment Installation Cost - 1.800 - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost - 28.800 - - - Cost Elements ($ in Millions) FY 2025 FY 2026 Month & Year Mar 2026 Sep 2029 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 Base request. Procurement dollars supports modernization upgrades to the Industrial Wastewater Treatment Facility at Holston Army Ammunition Plant, treating and mitigating hydrogen sulfide emissions. Protective covers will be installed, as well as heating, ventilation, and air conditioning equipment. Protective covers will be installed, as well as Hydrogen Sulfide Emission collection equipment. The purpose of the Hydrogen Sulfide Emission collection equipment will be to capture and transfer the hydrogen sulfide to a thermal oxidizer, which will burn and safely treat disperse the gas emissions. These modernization upgrades will improve personnel safety, electrical system and component failures, infrastructure corrosion, and outside boundary line odor as well as assuring regulatory compliance and supporting resiliency of the treatment facilities. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 12 of 62 P-1 Line #35 Volume 1 - 830 === page 863 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: RDX Wastewater - Pump Station Upgrades Project Number: 5263986 Project Category: End Item Supported Model: Research Develop Expl (RDX), Insensitive Mun Expl (IMX) FY 2027 Base FY 2027 OOC FY 2027 Total Annual Capacity Before / After (1-8-5): / A. Construction Cost - 32.000 - - - Facility Name: Holston Army Ammunition Plant Facility Location: Kingsport, Tennessee Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - 17.000 - - - Principal Milestones Month & Year C. Equipment Installation Cost - 6.200 - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - Aug 2026 Aug 2028 Aug 2028 G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost - 55.200 - - - Cost Elements ($ in Millions) FY 2025 FY 2026 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 base request. Procurement dollars supports modernization upgrades to the current Wastewater Pump Station at Holston Army Ammunition Plant. The existing explosive service pumps have exceeded their service life and are challenged to maintain adequate capacity during high flow periods. The controls systems, transformers, and switchgear are vintage equipment, and thus are not capable of remote communication and operation via the Industrial Wastewater Treatment Facility control room. This project will assure sufficient waterflow as Holston AAP achieves increased facility production capacity of RDX and IMX energetics. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 13 of 62 P-1 Line #35 Volume 1 - 831 === page 864 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: ANSOL Thermal Destruction, Construction Project Number: 5265096 Project Category: End Item Supported Model: Research Develop Expl (RDX), High Melt Expl (HMX), FY 2027 Base FY 2027 OOC FY 2027 Total Annual Capacity Before / After (1-8-5): / A. Construction Cost - 90.000 - - - Facility Name: Holston Army Ammunition Plant Facility Location: Kingsport, Tennessee Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - 70.000 - - - Principal Milestones C. Equipment Installation Cost - 30.000 - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - 10.000 - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost - 200.000 - - - Cost Elements ($ in Millions) FY 2025 FY 2026 Month & Year May 2027 Apr 2026 Apr 2029 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 Base request. Procurement dollars supports the design and construction of an onsite thermal treatment system for the destruction of Ammonium Nitrate Solution (ANSOL) that is generated as a by-product of RDX and HMX explosives production at Holston Army Ammunition Plant. The ANSol by-product cannot be stored on site longer than 90 days and if it is not disposed of within the appropriate timeframe has the potential to shut down RDX and HMX production at HSAAP. This effort will mitigate the reliance on an off-site disposal solution for ANSOL while supporting the RDX and HMX capacity requirements to increase resiliency within the Defense Industrial Base ammunition production. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 14 of 62 P-1 Line #35 Volume 1 - 832 === page 865 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Lacquer Prep Facility Sustainment Project Number: 5265114 Project Category: End Item Supported Model: Plastic Bonded Explosive (PBX) Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - 0.350 - - - Facility Name: Holston Army Ammunition Plant Facility Location: Kingsport, Tennessee Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - 0.850 - - - Principal Milestones C. Equipment Installation Cost - 0.400 - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost - 1.600 - - - Cost Elements ($ in Millions) FY 2025 FY 2026 Month & Year Feb 2026 Feb 2028 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 Base request. Procurement dollars supports sustainment of the Lacquer Preparation Facility at Holston Army Ammunition Plant. The Lacquer Preparation Facility provides a critical function in the manufacture of plastic bonded explosive (PBX) formulations used in the U.S. Department of War (DoW) weapon systems. In this facility, polymeric materials are dissolved in solvents to form a lacquer. The lacquer is used in coating the explosives to form various explosive formulations that are mainly pressed into warheads, boosters, or extruded. The Lacquer Preparation Facility is the origin for all Insensitive Munitions (IM). This project will provide necessary improvements and refurbishment to sustain production in the existing facility until a new, modern facility is designed and constructed. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 15 of 62 P-1 Line #35 Volume 1 - 833 === page 866 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Consolidated Compressed Air Facility, Construction Project Number: 5XX5167 Project Category: End Item Supported Model: Research Develop Expl (RDX), High Melt Expl (HMX), Insensitive Mun Expl (IMX) FY 2027 Base FY 2027 OOC FY 2027 Total Annual Capacity Before / After (1-8-5): / A. Construction Cost 2.502 3.850 - - - Facility Name: Holston Army Ammunition Plant Facility Location: Kingsport, Tennessee Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost 9.275 18.500 - - - Principal Milestones Month & Year C. Equipment Installation Cost 1.123 1.650 - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: May 2026 Jan 2029 Mar 2028 Jan 2029 Mar 2029 Total Project Cost 12.900 24.000 - - - Cost Elements ($ in Millions) FY 2025 FY 2026 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 Base request. Procurement dollars supports the second phase of this project, which will design and construct a new compressed air facility in the western area of Holston Army Ammunition Plant (AAP). The existing compressed air facility has compressors with operating voltages that will be phased out in the future, creating maintenance and replacement challenges. The relocation of the new facility will be outside the explosive manufacturing area to reduce the chance of damage by an accidental detonation. Phase 1 and Phase 2 will achieve enhanced reliability associated with two independent facilities. Compressed air is necessary for numerous manufacturing and energetics operations for reliable, quick, and safe energy source for various industrial applications. It powers machinery, automation, control system valves, assembly, cleaning, and quality control processes as well as supports material transfers via pipelines. Replacement of the compressors and compressed air facility will ensure production continuity for all explosives at Holston AAP. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 16 of 62 P-1 Line #35 Volume 1 - 834 === page 867 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: New Lacquer Prep Facility Design Build Project Number: 5275267 Project Category: End Item Supported Model: Research Develop Expl (RDX), High Melt Expl (HMX), Plastic Bonded Expl (PBX) FY 2027 Base FY 2027 OOC Annual Capacity Before / After (1-8-5): / FY 2027 Total FY 2025 FY 2026 A. Construction Cost - - 70.000 - Facility Name: Holston Army Ammunition Plant Facility Location: Kingsport, Tennessee 70.000 Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - 50.000 - 50.000 Principal Milestones Month & Year C. Equipment Installation Cost - - 15.000 - D. Contractor Support Cost - - 10.000 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - Aug 2027 Aug 2028 Mar 2027 Sep 2030 G. Total Facility Project Cost - - - - H. Other Costs - - - - 15.000 Concept Design Complete: 10.000 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - - 145.000 Cost Elements ($ in Millions) 145.000 Project Number Title Oct 2030 Mar 2031 Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 base procurement dollars in the amount of $145.300 million supports the replacement of the legacy Lacquer Preparation Facility at Holston Army Ammunition Plant (AAP). This project provides a critical function in the manufacture of plastic bonded explosive (PBX) formulations used in the U.S. Department of War (DoW) weapon systems. This will also replace the solvent tank farm, which is necessary to support overall production throughout HSAAP. In this facility, polymeric materials are dissolved in solvents to form a lacquer. The lacquer is used in coating the explosives to form various explosive formulations that are mainly pressed into warheads, boosters, or extruded. This project will provide necessary improvements and refurbishment to sustain production in the existing facility until a new, modern facility is designed and constructed. This a new start. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 17 of 62 P-1 Line #35 Volume 1 - 835 === page 868 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: G-10 Process Improvements Project Number: 5265285 Project Category: End Item Supported Model: Triaminotrinitrobenzene (TATB) Operations; TATB Capacity Increase Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Holston Army Ammunition Plant Facility Location: Kingsport, Tennessee Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - - - - Principal Milestones Month & Year C. Equipment Installation Cost - - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - 7.800 - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Mar 2026 Mar 2028 Mar 2028 Apr 2028 May 2028 Total Project Cost - 7.800 - - - Cost Elements ($ in Millions) Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 Base request. Procurement dollars supports modernization upgrades to the G-10 Agile Manufacturing Facility at Holston Ammunition Plant. G-10 produces TATB which is a critical component of plastic bonded explosive formulations. This project will improve toluene emissions controls by replacing the dated GH-21 condenser with a GH-21 condenser that complies with industry requirements, enabling additional TATB explosives production for Department of War (DoW) and Department of Energy (DoE) while reducing safety risks. The project also improves building infrastructure systems, such as electrical and mechanical systems, HVAC and ventilation systems, fire suppression and safety systems, and lighting and electrical distribution systems. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 18 of 62 P-1 Line #35 Volume 1 - 836 === page 869 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: PAX - 3 Production G Building Modernization & Construction Project Number: 5255288 Project Category: End Item Supported Model: Grenades and Tank Ammunition Annual Capacity Before / After (1-8-5): / FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost 7.350 - - - - Facility Name: Holston Army Ammunition Plant Facility Location: Kingsport, Tennessee Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost - - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs 0.700 - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost 8.050 - - - - Cost Elements ($ in Millions) FY 2025 Month & Year Dec 2025 Feb 2027 Mar 2028 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 Base request. Procurement dollars supports the modernization and construction of additional Picatinny Arsenal Explosive-3 (PAX) capacity at Holston Army Ammunition Plant. PAX-3 is currently produced at the pilot plant which cannot support the anticipated production requirements and other cost supports the commissioning materials and labor. The pilot plant has been used recently to produce PAX-3 in small quantities up to a few thousand pounds annually. Additional production would significantly interfere with other operations for which the building is intended. Moving the PAX-3 process relocates operations from a temporary, shared facility to a more dedicated space designed for long-term efficiency and worker safety. This move allows for the integration of automation and ergonomic improvements, addressing mechanical and health hazards. Shifting production to a new facility will increase production, improving efficiency to meet the anticipated future requirements. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 19 of 62 P-1 Line #35 Volume 1 - 837 === page 870 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Secondary Process River Water Intake Facility Construction Project Number: 5255289 Project Category: End Item Supported Model: Research Develop Expl(RDX),High Melt Expl(HMX),Insensitive Mun Expl(IMX) FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Annual Capacity Before / After (1-8-5): / A. Construction Cost 82.855 - - - - Facility Name: Holston Army Ammunition Plant Facility Location: Kingsport, Tennessee Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost - - - - - D. Contractor Support Cost - - - - - 2.563 - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost 85.418 - - - - Cost Elements ($ in Millions) FY 2025 E. Corps of Engineers Support Cost Month & Year Dec 2024 Mar 2025 / Feb 2026 Jan 2029 Dec 2028 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 Base request. Procurement dollars supports the construction of a secondary process river water intake facility at Holston Army Ammunition Plant. The filtered water plant supplies process water to production, deluge systems & fire protection, safety showers, eyewashes, and the steam plant. The new River Water Pump House and Intake Facility will increase redundancy and improve capability. This project will create an additional river water intake facility, eliminating the aging intake structure and will function as the primary river water intake. In addition, the current river water intake was found to be noncompliant with the Clean Water Act section 316(b) provisions regarding the velocity of intake water through the traveling screens and the possibility to impinge aquatic life. The secondary process river water intake facility is both a critical input for chemical synthesis and a necessary cooling resource, making it indispensable for HSAAP's mission to produce high-quality explosives reliably, safely, and sustainably. Its operational presence safeguards production continuity, worker safety, and compliance with environmental standards. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 20 of 62 P-1 Line #35 Volume 1 - 838 === page 871 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Water Distribution Modernization Project Number: 5275291 Project Category: End Item Supported Model: Research Develop Expl (RDX), High Melt Expl (HMX), Insensitive Mun Expl (IMX) FY 2027 Base FY 2027 OOC Annual Capacity Before / After (1-8-5): / FY 2027 Total FY 2025 FY 2026 A. Construction Cost - - 30.000 - Facility Name: Holston Army Ammunition Plant Facility Location: Kingsport, Tennessee 30.000 Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - 10.000 - 10.000 Principal Milestones C. Equipment Installation Cost - - 6.000 - D. Contractor Support Cost - - 4.356 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - 6.000 Concept Design Complete: 4.356 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 50.356 - 50.356 Cost Elements ($ in Millions) Project Number Month & Year Title Mar 2027 Jan 2029 Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement funding of $50.356 million supports the Water Distribution Modernization project, which will replace aging and degraded main river and filtered water distribution headers at the facility. A recent water distribution study identified critical deficiencies and risk of failure in the decades-old infrastructure, including internal corrosion and material stress. Failure of these systems would halt high explosives production, causing significant delays and disrupting the Department of War's (DoW) munitions supply chain. This project is essential to maintain operational readiness, ensure production continuity, and support the plant's mission of supplying high explosives to the DoW. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 21 of 62 P-1 Line #35 Volume 1 - 839 === page 872 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Explosive Production Modernization and Resiliency Project Number: 5265293 Project Category: End Item Supported Model: RDX, HMX, Production By-Product Management FY 2027 Base FY 2027 OOC Annual Capacity Before / After (1-8-5): / FY 2027 Total FY 2025 FY 2026 A. Construction Cost - - 224.376 - Facility Name: Holston Army Ammunition Plant Facility Location: Kingsport, Tennessee 224.376 Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - 178.654 - 178.654 Principal Milestones Month & Year C. Equipment Installation Cost - - 98.765 - D. Contractor Support Cost - - 4.563 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - Jan 2028 Jan 2029 Aug 2027 Feb 2031 G. Total Facility Project Cost - - - - H. Other Costs - - 13.642 - 98.765 Concept Design Complete: 4.563 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: 13.642 Total Project Cost - - 520.000 - 520.000 Cost Elements ($ in Millions) Project Number Title Mar 2031 Mar 2032 Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: The FY27 Base Procurement funding allocation of $520.000 million supports plant-wide upgrades essential for ensuring the resilience and sustainability of operations, including the management and treatment of by-products from energetic production, and increasing production input supplies and product capacities at Holston Army Ammunition Plant. This funding will enable the implementation of advanced treatment systems and infrastructure improvements that enhance the facility's ability to process, reuse, treat, and dispose of hazardous by-products including ANSol (Ammonium Nitrate Solution), spend acids and other by-products generated during energetic material manufacturing in accordance with federal regulations and safety standards. This includes upgrades to acids area pre-treatment, containment infrastructure, strong nitric acid (SNA) pipeline infrastructure, and monitoring technologies to ensure the proper handling of materials that pose risks to personnel, equipment, and the surrounding environment. This investment supports the modernization of production processes to reduce the generation of by-products or recycling by-products and modernization of infrastructure including cooling water infrastructure. By integrating modern technologies, the facility will be better equipped to recycle or repurpose certain by-products, to include spend acids, contributing to a more sustainable and cost-effective operation. Additionally, upgrades under this project will bolster the facility's ability to respond to increased production demands and will enhance the facility's ability to maintain readiness and support critical ammunition production. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 22 of 62 P-1 Line #35 Volume 1 - 840 === page 873 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Tank Line (Line 2) Sustainment - Phase II Project Number: 5263411 Project Category: End Item Supported Model: 105mm and 120mm Tank Ammunition FY 2027 Base Annual Capacity Before / After (1-8-5): / FY 2027 OOC FY 2027 Total A. Construction Cost - 2.444 2.550 - Facility Name: Iowa Army Ammunition Plant Facility Location: Middletown, Iowa 2.550 Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - 0.750 1.075 - 1.075 Principal Milestones C. Equipment Installation Cost - 0.250 0.275 - D. Contractor Support Cost - - - - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - 0.275 Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - 3.444 3.900 - 3.900 Cost Elements ($ in Millions) FY 2025 FY 2026 Project Number Month & Year Title Mar 2026 / Mar 2027 Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars in the amount of $3.900 million supports Tank Line (Line 2) sustainment Phase II at Iowa Army Ammunition Plant. Line 2 is the Load Assembly and Packout (LAP) for 120mm (M1 Abrams series) and 105mm tank ammunition. This includes both training and tactical ammunition for both calibers. Line 2 has been in operation for over 70 years and requires sustainment and repairs to assure production availability. Phase II will include projects to replace obsolete automated assembly equipment that can no longer be used and manual processes have been reintroduced to maintain production. This would include replacing and updating conveyors, carts and barcode scanning systems, updating material handling equipment more suited to the modern, heavier projectile assemblies and adding redundance testing equipment so tactical products assembled in 2-10 do not need to be transported to 2-12 for final air testing. Additionally, the project will maintain regulatory compliance and mitigate health and safety impacts to allow for continued operations. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 23 of 62 P-1 Line #35 Volume 1 - 841 === page 874 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Future Artillery Complex Project Number: 5XX5030 Project Category: End Item Supported Model: Artillery and Mortars Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost 240.650 1.000 - - - Facility Name: Iowa Army Ammunition Plant Facility Location: Middletown, Iowa Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost 26.000 - - - - Principal Milestones Month & Year C. Equipment Installation Cost 10.000 - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs 4.000 1.500 - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Aug 2026 Sep 2019 / Apr 2027 Oct 2028 Oct 2028 Nov 2028 Jul 2029 Total Project Cost 280.650 2.500 - - - Cost Elements ($ in Millions) FY 2025 FY 2026 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 Base request. Procurement dollars supports commissioning of a modern artillery production facility at Iowa Army Ammunition Plant. The existing melt pour operation is a WWII era facility designed for mass production quantities and does not meet modern requirements. The existing facility is limited by process constraints resulting in low rates of production not meeting current demand and surge. The existing process is laborious and time consuming, with limited process controls and antiquated equipment and infrastructure. This modernization project will relocate and reduce the overall footprint of the artillery melt pour process and mortar line production operations. This modernization effort improves the load, assembly and pack-out process and reduces the cost of munitions. This new artillery production facility will achieve efficient manufacturing operations, automation for operator safety improvements, graceful degradation by separation of facilities explosive arcs and duplicate production lines, improve quality control, improve on energy efficiencies and allow for production of next generation artillery all while being capable of scaling capacity for both peace and war production requirements. This project supports artillery (155mm M795, XM1113, and M1128) and mortar (120mm, 81mm, and 60mm) production programs. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 24 of 62 P-1 Line #35 Volume 1 - 842 === page 875 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Critical Yard C Upgrades Project Number: 5275124 Project Category: End Item Supported Model: Tank, warheads, mortars, artillery, medium caliber, C4 FY 2027 Base FY 2027 OOC Annual Capacity Before / After (1-8-5): / FY 2027 Total FY 2025 FY 2026 A. Construction Cost - - 2.300 - Facility Name: Iowa Army Ammunition Plant Facility Location: Middletown, Iowa 2.300 Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - 8.000 - 8.000 Principal Milestones C. Equipment Installation Cost - - 2.000 - D. Contractor Support Cost - - - - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - 2.000 Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 12.300 - 12.300 Cost Elements ($ in Millions) Project Number Month & Year Title Mar 2027 May 2029 Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars in the amount of $12.300 million supports Critical Yard C Upgrades at Iowa Army Ammunition Plant (AAP). This project addresses repairs and replaces the deficient rail infrastructure at Yard C, which is the main storage facility for items such as TNT, M795 finished goods, and category II munitions. This project will enable UFC 4-860-03, Railroad Track Maintenance and Safety Standards compliance with rail lengths and conditions. UFC 4-860-03 is essential for ensuring the safety, reliability, and operational efficiency of railroad infrastructure on Department of War installations. By providing clear maintenance and safety standards, it helps prevent accidents, reduces downtime, and supports mission-critical transportation needs. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 25 of 62 P-1 Line #35 Volume 1 - 843 === page 876 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Line 3A Sustainment Project Number: 5265241 Project Category: End Item Supported Model: Artillery and Mortars Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - 0.750 - - - Facility Name: Iowa Army Ammunition Plant Facility Location: Middletown, Iowa Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - 2.985 - - - Principal Milestones Month & Year C. Equipment Installation Cost - 0.993 - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Mar 2026 Dec 2027 Mar 2028 Mar 2028 May 2028 Total Project Cost - 4.728 - - - Cost Elements ($ in Millions) FY 2025 FY 2026 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 Base request. Procurement dollars supports repairs and upgrades to Line 3A production operations at Iowa Army Ammunition Plant. Line 3A provides melt pour operations of artillery and mortar munitions and has been in operation for over eighty years. Sustainment efforts are required for continued production and to extend the life of the line by several years to continue to meet production demand. Some of the efforts include multiple line efficiency improvements, improved recycle and reuse of explosives and metal parts, and improved energetic screening. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 26 of 62 P-1 Line #35 Volume 1 - 844 === page 877 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: AMP and Hellfire Modernization, Phase 2 Project Number: 5275247 Project Category: End Item Supported Model: Hellfire, Javelin, 120mm Tank, and warheads FY 2027 Base FY 2027 OOC Annual Capacity Before / After (1-8-5): / FY 2027 Total FY 2025 FY 2026 A. Construction Cost - - 39.850 - Facility Name: Iowa Army Ammunition Plant Facility Location: Middletown, Iowa 39.850 Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - 1.235 - 1.235 Principal Milestones Month & Year C. Equipment Installation Cost - - 0.615 - D. Contractor Support Cost - - - - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - 0.615 Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Nov 2025 Feb 2027 Feb 2026 / May 2027 Jun 2028 Oct 2028 Nov 2028 Feb 2029 Total Project Cost - - 41.700 - 41.700 Cost Elements ($ in Millions) Project Number Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars in the amount of $41.700 million supports modernization and expansion of 120mm M1147 Advanced Multi-Purpose round (AMP) production to meet current explosive safety requirements at Iowa Army Ammunition Plant (AAP). AMP is the Army's tactical, go-to-war, next generation 120mm tank round that delivers overmatch lethality for the Abrams Main Battle Tank (MBT). The project was funded with prior year dollars to complete construction and secures full commissioning and prove-out of the new facility. This follow-on project addresses critical safety and operational requirements to separate and relocate Hellfire and AMP warhead pressing operations from their current co-located space to comply with safety regulations. This project encompasses three phases: construction and relocation, equipment procurement and installation, and commissioning/qualification. This project also provides the ancillary benefit of modernizing and sustaining uninterrupted production of Hellfire missile warheads, which are utilized for anti-armor targets and precision counter drone strikes. This relocation strengthens the domestic industrial base for critical missile components, reducing reliance on foreign sources and bolstering national security. Furthermore, the modernized facilities will provide increased surge capacity and adaptability to accommodate evolving warfighter needs and future weapon system development. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 27 of 62 P-1 Line #35 Volume 1 - 845 === page 878 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Relocation of 40mm Grenade and Spitback Pressing Operations Project Number: 5255304 Project Category: End Item Supported Model: 40mm Grenades Annual Capacity Before / After (1-8-5): / FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost 23.000 - - - - Facility Name: Iowa Army Ammunition Plant Facility Location: Middletown, Iowa Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost 8.000 - - - - Principal Milestones Month & Year C. Equipment Installation Cost 2.000 - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - Dec 2025 / May 2025 Dec 2028 Jun 2027 G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost 33.000 - - - - Cost Elements ($ in Millions) FY 2025 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 Base request. Procurement dollars supports design and build a new 40mm pressing facility and provide 40mm pressing equipment at the Iowa Army Ammunition Plant (IAAAP) that alleviates the Deviation Approval and Risk Acceptance Document (DARAD). The new building will support 40mm M430A1 grenade and spitback pressing operations. This will include installation of new presses, screening table, and all associated controls and support equipment for the manufacture of 40mm grenades and spitback loading assemblies at IAAAP. The procured equipment will provide required protection from over pressure in the event of a high order incident, as well as reduce in-plant transportation requirements for grenade components, implement press improvements to enhance 40mm grenade quality, and reorient the spitback pressing operations to meet requirements. The newly acquired building, press, utilities and support equipment will have the capability to support the assembly of 8,880 units of M430A1, per ten (10) hour shift. Received $33.000 million of FY 2025 Congressional funding to support this effort. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 28 of 62 P-1 Line #35 Volume 1 - 846 === page 879 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Small Caliber Modernization, 6.8mm Ammunition Production Facility Project Number: 5XX3356 Project Category: End Item Supported Model: 6.8mm Cost Elements ($ in Millions) Annual Capacity Before / After (1-8-5): / FY 2025 A. Construction Cost - FY 2026 - FY 2027 Base FY 2027 OOC FY 2027 Total - Facility Name: Lake City Army Ammunition Plant Facility Location: Independence, Missouri Facility Type (GOGO, GOCO, COCO): GOCO - - B. Equipment Cost 140.000 162.864 99.315 - 99.315 Principal Milestones C. Equipment Installation Cost 19.000 61.568 30.605 - D. Contractor Support Cost Month & Year 2.345 2.368 2.500 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - 10.000 - - 30.605 Concept Design Complete: 2.500 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - - 132.420 Total Project Cost 161.345 236.800 132.420 Project Number Title Dec 2017 / Apr 2027 Dec 2028 Dec 2032 Jan 2027 Sep 2032 Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars in the amount of $132.420 million supports purchase of production equipment for the 6.8mm Ammunition Production facility at Lake City Army Ammunition Plant (AAP). Effort includes the ammunition production equipment purchase and installation as well as design, validation and proveout of cartridge manufacturing equipment to support initial production volumes. The equipment will support production capacity to achieve the Total Army Munitions Requirement (TAMR) for training, combat, and war reserve. The new facility will provide a state-of-the-art safe manufacturing capability to Lake City AAP. The equipping phases will ensure the 6.8mm ammunition production facility utilizes modern manufacturing systems and equipment for producing cutting edge small caliber ammunition products and will include systems capable of manufacturing 6.8mm projectiles, cartridge cases, and finished cartridges. Production disciplines may include metal and polymer parts manufacturing as well as energetic operations for charging, priming, and loading ammunition. Additionally, classified manufacturing, charging, priming, and loading capability will also be established. Cartridge packing areas, process quality controls including testing laboratories, maintenance operations, and general use administrative area including shipping and receiving of raw materials and finished products to support large-scale production to meet Army requirements will be included. The manufacturing processes will have a significant level of automation with advanced safety and environmental sustainable material handling operations ensuring graceful degradation, operational resilience, and isolation of mass energetics from people. The production building and process support systems will be designed to accommodate best practice manufacturing methodologies, processes, and equipment that provide flexible, maintainable, and sustainable operations to ensure manufacturing readiness to meet future requirements and technology advancements. The production facility will be able to produce a suite of 6.8mm training and combat cartridges. Selection of Lake City AAP as the 6.8mm ammunition production facility will promote long-term security of supply for 6.8mm ammunition by integrating the loading, assembly, and pack out processes with the production of major ammunition LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 29 of 62 P-1 Line #35 Volume 1 - 847 === page 880 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Small Caliber Modernization, 6.8mm Ammunition Production Facility Project Number: 5XX3356 Project Category: End Item Supported Model: 6.8mm Annual Capacity Before / After (1-8-5): / subcomponents, such as cartridge case manufacturing, and projectile forming. Capability Program Executive (CPE), Ammunition and Energetics (A&E) is the agency lead for the development of this requirement to provide a new squad weapon ammunition round to increase Soldier lethality. Lake City AAP was identified as the production site for the Next Generation Squad Weapon round due to its existing ammunition production support infrastructure and its ability to retain highly qualified, expert small caliber ammunition manufacturing personnel. There is currently no high capacity 6.8mm ammunition manufacturing facilities in the National Technology Industrial Base (NTIB). This program will deliver light weight, performance enhanced small-caliber ammunition to Warfighters for improved mission readiness and assured overmatch capability. At completion, Lake City AAP will provide high-volume capability within the organic industrial base to produce 6.8mm ammunition. Lake City AAP will have state-of-theart manufacturing equipment, processes, facilities, and infrastructure to achieve the Army's annual production requirement, with no impact to current production capacity for legacy small caliber ammunition under a surge scenario. Received $161.345 million in FY 2025 from an approved reprogramming action. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 30 of 62 P-1 Line #35 Volume 1 - 848 === page 881 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: 7.62MM Reduced Range Ammunition Process Modernization and Construction Project Number: 5253360 Project Category: End Item Supported Model: 7.62mm Annual Capacity Before / After (1-8-5): / FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost 36.500 - - - - Facility Name: Lake City Army Ammunition Plant Facility Location: Independence, Missouri Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost 15.290 - - - - Principal Milestones Month & Year C. Equipment Installation Cost 3.500 - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Mar 2025 Sep 2026 Nov 2025 Oct 2027 Aug 2027 Apr 2027 Dec 2027 Total Project Cost 55.290 - - - - Cost Elements ($ in Millions) FY 2025 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 Base request. Procurement dollars supports modernization and construction of facilities, and process modernization improvements of a new 7.62mm Reduced Range Ammunition production capabilities at Lake City Army Ammunition Plant (AAP). There is currently no Reduced Range Ammunition production at Lake City AAP. This new technology for reduced range ammunition has reached a level of maturity for implementation into a high-speed manufacturing environment. This project supports subsonic ammunition, specifically designed to lower muzzle velocity, preserve training facilities, and allow for training in existing facilities which are not conducive to the current ammunition. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 31 of 62 P-1 Line #35 Volume 1 - 849 === page 882 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: New One Way Luminescence Ammo Facility Construction & Equipment Project Number: 5253361 Project Category: End Item Supported Model: Small Caliber Ammunition Annual Capacity Before / After (1-8-5): / FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost 25.800 - - - - Facility Name: Lake City Army Ammunition Plant Facility Location: Independence, Missouri Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost 7.050 - - - - Principal Milestones Month & Year C. Equipment Installation Cost 1.100 - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Mar 2025 May 2025 Nov 2025 Dec 2026 Aug 2027 Apr 2028 Dec 2028 Total Project Cost 33.950 - - - - Cost Elements ($ in Millions) FY 2025 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 Base request. Procurement dollars supports the modernization and construction of facilities, equipment, and process modernization improvements of the One Way Luminescence (OWL) Ammunition capability at Lake City Army Ammunition Plant (AAP). This project establishes a new production capability at Lake City AAP that will produce the OWL. The OWL tracer is one part of a suite of next generation small caliber ammunition which includes the XM1161 and XM1201 cartridges. The OWL tracer improves Soldier capabilities with reduced risk to personnel and the environment. New OWL technology brings in a completely new set of requirements for production. New OWL technology brings in a completely new set of requirements for production. Existing manufacturing technology is incapable of producing the OWL projectiles. Total costs include procurement of new equipment, installation, and improvements to existing facilities to ensure reliable and resilient support infrastructure. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 32 of 62 P-1 Line #35 Volume 1 - 850 === page 883 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: HVAC Instrument and Control Modernization Project Number: 5273777 Project Category: End Item Supported Model: Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC FY 2027 Total FY 2025 FY 2026 A. Construction Cost - - 1.750 - Facility Name: Lake City Army Ammunition Plant Facility Location: Independence, Missouri 1.750 Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - 0.750 - 0.750 Principal Milestones C. Equipment Installation Cost - - 0.289 - D. Contractor Support Cost - - - - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - 0.289 Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 2.789 - 2.789 Cost Elements ($ in Millions) Project Number Month & Year Title Mar 2028 Mar 2027 May 2029 May 2029 Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars in the amount of $2.789 million supports HVAC instrument and control modernization for the mix houses. The primer mix houses for ammunition production currently have outdated HVAC systems that use phased-out refrigerants and fail to provide adequate temperature, humidity, and airflow control. These deficiencies create unsafe working conditions, compromise production quality, and pose risks to personnel and facility operations. Immediate replacement of the HVAC systems is essential to preserve production capacity, ensure safe handling of energetic materials, and maintain environmental conditions conducive to primer production within quality tolerances. Upgrades will include new industrial-grade air handlers, ductwork, exhaust systems, and precision controls integrated into the plantwide monitoring system to ensure reliable and efficient operation. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 33 of 62 P-1 Line #35 Volume 1 - 851 === page 884 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Automated Contaminated Waste Plant Project Number: 5245233 Project Category: End Item Supported Model: 5.56mm, 7.62mm, and .50 Cal Annual Capacity Before / After (1-8-5): / FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost 2.000 - - - - Facility Name: Lake City Army Ammunition Plant Facility Location: Independence, Missouri Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost 4.000 - - - - Principal Milestones Month & Year C. Equipment Installation Cost 1.500 - - - - D. Contractor Support Cost - - - - - 0.500 - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Apr 2023 Feb 2025 Jun 2021 / Aug 2026 Aug 2028 Aug 2027 Sep 2028 Aug 2029 Total Project Cost 8.000 - - - - Cost Elements ($ in Millions) FY 2025 E. Corps of Engineers Support Cost Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 Base request. Procurement dollars supports construction of a new Automated Contaminated Waste Plant at Lake City Army Ammunition Plant. This new facility will provide the capability for decontamination of various plant production equipment and items which have been contaminated with propellant, explosives, and pyrotechnic compounds. The new facility will provide liquid (wet-kill) decontamination bays as well as a decontamination verification car-bottom oven. The facility will also include necessary waste collection, treatment, and neutralization provisions. In addition, this project will include in-process material staging areas, building upgrades, and equipment to support the two buildings/operations as well as the replacement of 160C Explosive Lift Station. Received $8.000 million of FY 2025 Congressional funding to support this effort. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 34 of 62 P-1 Line #35 Volume 1 - 852 === page 885 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Energetic Waste Incinerator: Construction Project Number: 5265236 Project Category: End Item Supported Model: 5.56mm, 7.62mm, 6.8mm, .50 Cal, 20mm FY 2027 Base Annual Capacity Before / After (1-8-5): / FY 2027 OOC FY 2027 Total A. Construction Cost - 45.564 47.160 - Facility Name: Lake City Army Ammunition Plant Facility Location: Independence, Missouri 47.160 Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - 147.516 35.880 - 35.880 Principal Milestones Month & Year C. Equipment Installation Cost - 30.832 10.460 - D. Contractor Support Cost - - - - E. Corps of Engineers Support Cost - 9.866 6.500 - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - 6.167 - - 10.460 Concept Design Complete: Final Design Complete: Initial/Final Project Award: 6.500 Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Jun 2026 Mar 2026 / Aug 2026 Dec 2029 Dec 2029 Jan 2030 Aug 2030 Total Project Cost - 239.945 - 100.000 Cost Elements ($ in Millions) FY 2025 FY 2026 100.000 Project Number Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars in the amount of $100.000 million supports construction of a new Energetic Waste Incinerator (EWI) at Lake City Army Ammunition Plant (AAP). The current EWI incinerates scrap material, to include energetics, during production of legacy and next generation ammunition products. The equipment residing in the current EWI complex has exceeded its' expected life expectancy and requires repairs and modifications to continue operating. This is a single point of failure due to limitations on stockpiling explosive waste material at Lake City AAP. In addition, the current EWI will not be able to handle full rate production of new 6.8mm ammunition, which includes new chemical compounds to the existing manufacturing base. This project will replace the existing EWI, associated feed system, air pollution control equipment, and support facilities to maintain the capability to process the current scrap from conventional small caliber munitions. The new equipment will not be as susceptible to failure as the old equipment, which is in poor condition and is prone to malfunctions and downtime and will also result in improvements in operational efficiency. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 35 of 62 P-1 Line #35 Volume 1 - 853 === page 886 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Batch Production Furnace Upgrades Project Number: 5275414 Project Category: End Item Supported Model: Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC - - - - 6.000 - 6.000 Principal Milestones - - 0.500 - D. Contractor Support Cost - - - - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - 0.500 Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 6.500 - 6.500 Cost Elements FY 2025 FY 2026 A. Construction Cost - B. Equipment Cost - C. Equipment Installation Cost ($ in Millions) FY 2027 Total - Facility Name: Quad Cities Cartridge Case Facility Facility Location: Rock Island, IL Facility Type (GOGO, GOCO, COCO): GOCO Project Number Month & Year Title Mar 2027 Dec 2027 Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars in the amount of $6.500 million supports the procurement and installation of a new batch production furnace for the Quad Cities Cartridge Case Facility (QCCCF). This project enhances the facility's operational efficiency by enabling batch-mode heat-treat cycles required for manufacturing Army 105mm and Navy 5-inch cartridge cases, including the M148A1B1 105mm Steel Direct Fire Case, M150 105mm Steel Direct Fire Case, M14 105mm Brass Indirect Fire Case, MK109 Navy 57-inch Brass Case, Navy 76mm Brass Case, and Bofors 40mm L60 and L70 Brass Cases. The existing continuous conveyor annealing furnace is highly inefficient during periods of reduced production and prone to frequent failures during start-up and shut-down operations. This initiative will significantly improve operational efficiency, provide a flexible and adaptable annealing process, and offer a scalable solution to meet both current and future production demands for deepdrawn cartridge cases at the facility. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 36 of 62 P-1 Line #35 Volume 1 - 854 === page 887 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Electrical Distribution System Upgrades Phase IV Project Number: 5263557 Project Category: End Item Supported Model: Electrical Distribution System Upgrades Phase IV Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - 2.750 - - - Facility Name: Radford Army Ammunition Plant Facility Location: Radford, Virginia Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - 15.770 - - - Principal Milestones Month & Year C. Equipment Installation Cost - 7.840 - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - 1.440 - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Sep 2026 Jan 2026 Mar 2028 Apr 2028 Jun 2028 Jul 2028 Total Project Cost - 27.800 - - - Cost Elements ($ in Millions) FY 2025 FY 2026 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 Base request. Procurement dollars supports automation upgrades to the Electrical Distribution System at Radford Army Ammunition Plant. Phase IV of this project provides upgrades and modernization of the electrical distribution system supporting the solvent propellant facility. This project will establish a dependable 69 kV electrical distribution loop to support the electrical requirements of RFAAP. This electrical distribution loop (~6 miles long) consists of aerial transmission lines that connect a series of substations which feed all areas of the facility. The substations step the primary loop 69kV power down to 2.4 kV and 12.4kV which then feeds power to transformers at the building and/or process level. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 37 of 62 P-1 Line #35 Volume 1 - 855 === page 888 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Tie-Line Modernization Project Number: 5265113 Project Category: End Item Supported Model: Propellants for Large, Medium, and Small Cal Munitions FY 2027 Base FY 2027 OOC FY 2027 Total Annual Capacity Before / After (1-8-5): / A. Construction Cost - 2.807 - - - Facility Name: Radford Army Ammunition Plant Facility Location: Radford, Virginia Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - 16.093 - - - Principal Milestones Month & Year C. Equipment Installation Cost - 8.000 - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - 1.500 - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: May 2026 Jan 2026 Apr 2027 May 2027 Jun 2027 Jul 2027 Total Project Cost - 28.400 - - - Cost Elements ($ in Millions) FY 2025 FY 2026 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 Base request. Procurement dollars supports the Tie-Line Modernization effort at Radford Army Ammunition Plant. This program will ensure a stable and dependable connection to the commercial electrical grid via a 3.1-mile transmission line. To improve resiliency, a new parallel transmission line will be constructed, and the existing line will be upgraded with new poles and components. This modernization is crucial, as the plant's operations would be severely limited if the tie-line were damaged, resulting in a power deficiency of around 60% of required power, and potentially disrupting critical missions and environmental compliance. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 38 of 62 P-1 Line #35 Volume 1 - 856 === page 889 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: New NC Facility Hammer Mill Phase II Project Number: 5273847 Project Category: End Item Supported Model: Mortars and Artillery Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC - - - - 16.000 - 16.000 Principal Milestones - - 10.800 - D. Contractor Support Cost - - 3.200 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - 10.800 Concept Design Complete: 3.200 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 30.000 - 30.000 Cost Elements FY 2025 FY 2026 A. Construction Cost - B. Equipment Cost - C. Equipment Installation Cost ($ in Millions) FY 2027 Total - Facility Name: Radford Army Ammunition Plant Facility Location: Radford, Virginia Facility Type (GOGO, GOCO, COCO): GOCO Project Number Month & Year Title Apr 2027 Oct 2028 Nov 2028 Jan 2029 Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars in the amount of $30.000 million supports new Hammer Mill equipment which is critical in Nitrocellulose (NC) production at Radford AAP. This advanced equipment technology is designed to enhance the quality of nitrocellulose (NC) fibers required for high-performance NC-based propellants. The project will improve the producibility and processing of NC, including precision cutting, and will support the production of triple-base propellants and combustible cartridge cases for mortars and artillery, particularly for 155mm systems. By increasing efficiencies and delivering higher-quality NC with tighter tolerances, the project ensures compliance with Military Specification (MILSPEC) standards for the triple-base propellant used in Modular Artillery Charge Systems (MACS). This phase of the initiative will focus on the procurement of long-lead equipment and its installation. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 39 of 62 P-1 Line #35 Volume 1 - 857 === page 890 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Hurricane Helene Restoration Project Number: 5255328 Project Category: End Item Supported Model: Propellants for Large, Medium, and Small Cal Munitions FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Annual Capacity Before / After (1-8-5): / A. Construction Cost 71.850 - - - - Facility Name: Radford Army Ammunition Plant Facility Location: Radford, Virginia Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost 47.000 - - - - Principal Milestones Month & Year C. Equipment Installation Cost - - - - - D. Contractor Support Cost 0.750 - - - - E. Corps of Engineers Support Cost 4.000 - - - - F. Other In-House Support Cost - - - - - Apr 2025 / Jun 2026 Apr 2028 Sep 2027 G. Total Facility Project Cost - - - - - H. Other Costs 1.500 - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost 125.100 - - - - Cost Elements ($ in Millions) FY 2025 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 Base request. Procurement dollars in prior years supported post Hurricane Helene storm restoration at Radford Army Ammunition Plant (AAP). These projects provided permanent repairs and upgrades to critical infrastructure and maintained resiliency and production continuity. The approach was divided into two phases, leveraging their contractual vehicles and bandwidth for the United States Army Corps of Engineers (USACE) and the facility operator. By utilizing this method, each subtask was executed by the respective organization, capitalizing on their core capabilities and ultimately accelerating the overall project timeline. Subtasks included the operator repairing the following: BioPlant, Water Buildings, Fourth Rolled Powder, Recovery, River Garage, perimeter security fencing, and various infrastructure locations. USACE constructed storage warehouses outside the floodplain. All these buildings/infrastructures were severely damaged during the Hurricane Helene Flood event. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 40 of 62 P-1 Line #35 Volume 1 - 858 === page 891 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Water Intake Pump Upgrades, Ph 2 Project Number: 5253741 Project Category: End Item Supported Model: Propellants for Large, Medium, and Small Cal Munitions FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Annual Capacity Before / After (1-8-5): / A. Construction Cost 15.600 - - - - Facility Name: Radford Army Ammunition Plant Facility Location: Radford, Virginia Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost 3.000 - - - - Principal Milestones C. Equipment Installation Cost 1.094 - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Cost Elements ($ in Millions) FY 2025 D. Contractor Support Cost - - - - - 1.200 - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Total Project Cost 20.894 - - - - E. Corps of Engineers Support Cost Month & Year Apr 2025 / Sep 2026 Sep 2028 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 Base request. Procurement dollars supports the upgrades to water intake at Radford Army Ammunition Plant. The current river water intake was built in the 1940's and has served the Radford Army Ammunition Plant with minimal upgrades during the past seventy years. Raw water is taken directly from the New River, and pumped to where it is filtered for use as process, drinking, and fire suppression water. The phase 1 effort of this program installed new intake pumps, variable frequency drives, new switches, and traveling screens in order to improve water intake capacity, efficiency, resiliency, and to bring RFAAP into environmental compliance regarding wildlife safety. However, despite the upgrades to the primary systems responsible for plant water intake, the surrounding support infrastructure was mostly untouched. The aging infrastructure surrounding the upgraded equipment places the phase 1 investments at risk of degradation due to inadequate protection. As a result, the scope in this phase 2 effort contains both the items that were noted as deficient or in need of replacement during inspections prior to phase 1 activities and as well as the items uncovered after phase 1 construction concluded such as the leaking of rainwater on the new pumps and the new control cabinets. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 41 of 62 P-1 Line #35 Volume 1 - 859 === page 892 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Radford Operations & Performance Work Statements Project Number: 5275398 Project Category: End Item Supported Model: Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Radford Army Ammunition Plant Facility Location: Radford, Virginia Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost - - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - H. Other Costs - - 120.000 - 120.000 Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost - - 120.000 - 120.000 Cost Elements ($ in Millions) - Month & Year Dec 2026 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars in the amount of $120.000 million supports the execution of indirect Performance Work Statements (PWS) for Radford Army Ammunition Plant ( AAP). PWS outlines the operational and maintenance requirements for the facility, which is critical for producing nitrocellulose, propellants, and rocket grains for the Department of War (DoW). Direct funding will improve budget forecasting, reduce pricing volatility caused by production volume changes, and eliminate the lengthy year-end reconciliation process. This strategy is essential to modernize aging infrastructure and ensure the continuity of operations at Radford AAP. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 42 of 62 P-1 Line #35 Volume 1 - 860 === page 893 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Radford New Operating Contractor Desired Upgrades Project Number: 5273801 Project Category: End Item Supported Model: Propellants Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC FY 2027 Total FY 2025 FY 2026 A. Construction Cost - - 265.303 - Facility Name: Radford Army Ammunition Plant Facility Location: Radford, Virginia 265.303 Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - 227.740 - 227.740 Principal Milestones Month & Year C. Equipment Installation Cost - - 93.682 - D. Contractor Support Cost - - - - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - Jun 2027 Jun 2030 Sep 2030 G. Total Facility Project Cost - - - - H. Other Costs - - 124.000 - 93.682 Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: 124.000 Total Project Cost - - 710.725 - 710.725 Cost Elements ($ in Millions) Project Number Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 base procurement funding of $710.725 million supports the modernization of Radford Army Ammunition Plant (AAP) facilities, to be executed in accordance with strategic facility investment proposals from the New Operating Contractor (NOC). These funds support facility reset including plant-wide improvements or the construction of new modernized facilities, based on priorities established by the NOC. Requirements include utility upgrades, infrastructure enhancements, plant waste disposal, or the design and construction of facilities to support the production of solvent and solventless propellant. Providing the NOC with flexibility in utilizing these funds ensures uninterrupted production and allows them to address critical issues within the plant as needed. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 43 of 62 P-1 Line #35 Volume 1 - 861 === page 894 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Electrical Upgrades Phase II Project Number: 5XX2985 Project Category: End Item Supported Model: 155mm Metal Parts Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost 0.866 - 1.000 - Facility Name: Scranton Army Ammunition Plant Facility Location: Scranton, Pennsylvania 1.000 Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost 1.900 - 11.500 - 11.500 Principal Milestones C. Equipment Installation Cost - - 2.500 - D. Contractor Support Cost - - - - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - 2.500 Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost 2.766 - 15.000 - 15.000 Cost Elements ($ in Millions) FY 2025 FY 2026 Project Number Month & Year Title May 2025 / Mar 2027 Mar 2028 Feb 2029 Mar 2029 Mar 2029 Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars in the amount of $15.000 million supports modernization of the at Scranton Army Ammunition Plant (AAP). 13KVA and 69KV equipment and construction. The electrical distribution system, installed in the 1950s and technologically obsolete since the 1980s, poses significant risks due to the difficulty in sourcing spare parts and repairs, with failures potentially causing prolonged shutdowns. These upgrades will ensure production continuity and enhance safety across the facility. Upward adjustment to definitize Phase I LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 44 of 62 P-1 Line #35 Volume 1 - 862 === page 895 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: A-Bay (DC) Crane Replacement Project Number: 5273144 Project Category: End Item Supported Model: Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC FY 2027 Total FY 2025 FY 2026 A. Construction Cost - - 0.250 - Facility Name: Scranton Army Ammunition Plant Facility Location: Scranton, Pennsylvania 0.250 Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - 0.650 - 0.650 Principal Milestones C. Equipment Installation Cost - - 0.200 - D. Contractor Support Cost - - 0.100 - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - 0.200 Concept Design Complete: 0.100 Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 1.200 - 1.200 Cost Elements ($ in Millions) Project Number Month & Year Title Apr 2027 Oct 2027 May 2028 Jun 2028 Jul 2028 Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars in the amount of $1.200 million supports modernization of the A-Bay (DC) Crane at Scranton Army Ammunition Plant (AAP). This will remove the obsolete DC-powered crane in A-Bay and install a new 480V AC 25T crane to support machine shop and production requirements. The scope includes inspecting, repairing, and aligning the rails as needed to ensure proper functionality. Upgrading the crane is critical to meet future production demands and prevent operational interruptions. Bay cranes are routinely used to relocate equipment within the bay, aid in maintenance and repair tasks, and remove full chip hoppers. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 45 of 62 P-1 Line #35 Volume 1 - 863 === page 896 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Infrastructure Repairs Project Number: 5275150 Project Category: End Item Supported Model: 155mm Metal Parts Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC FY 2027 Total FY 2025 FY 2026 A. Construction Cost - - 6.500 - Facility Name: Scranton Army Ammunition Plant Facility Location: Scranton, Pennsylvania 6.500 Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - 0.350 - 0.350 Principal Milestones Month & Year C. Equipment Installation Cost - - 0.150 - D. Contractor Support Cost - - - - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - Mar 2027 Mar 2029 Mar 2029 G. Total Facility Project Cost - - - - H. Other Costs - - - - 0.150 Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - 7.000 - 7.000 Cost Elements ($ in Millions) Project Number Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars in the amount of $7.000 million supports modernization of the Infrastructure at Scranton Army Ammunition Plant (AAP). This will stabilize and repair structural damage to the Administrative, Forge, and Production Shop buildings at the Scranton AAP, which have deteriorated due to age and freezethaw cycles since its construction in 1908. Immediate repairs are needed to replace concrete caps, address deteriorating subway arches, and restore brick and mortar in critical areas to prevent safety hazards such as falling debris. These repairs are essential to ensure a safe workplace for employees and maintain the integrity of the facility. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 46 of 62 P-1 Line #35 Volume 1 - 864 === page 897 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Forge Shop - Roof Repairs, Smog Hog Removal, & Rainwater Collection System Project Number: 5265193 Project Category: End Item Supported Model: Artillery Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - 2.900 - - - Facility Name: Scranton Army Ammunition Plant Facility Location: Scranton, Pennsylvania Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - 0.750 - - - Principal Milestones C. Equipment Installation Cost - 0.850 - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost - 4.500 - - - Cost Elements ($ in Millions) FY 2025 FY 2026 Month & Year Mar 2026 Mar 2027 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY2027 Base request. Procurement dollars in the amount of $4.500 million supports Forge Shop roof repairs, smog hog removal, and modernization of a rainwater collection system at Scranton Army Ammunition Plant (AAP). This project will remove the obsolete smog hog system located on the Forge Shop roof, repair the roof, and install additional gutters to stop water leakage into the forge production area. These repairs enhance the operational workforce and mitigate risk of injury. This project will also modernize the rainwater collection system to reduce the amount of municipal water used in the Forge Chiller system, providing economic benefit by reducing municipal water consumption. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 47 of 62 P-1 Line #35 Volume 1 - 865 === page 898 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: XM1113/1210 Modernization Upgrades Project Number: 5255185 Project Category: End Item Supported Model: XM113/XM1210 Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Scranton Army Ammunition Plant Facility Location: Scranton, Pennsylvania Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost 2.700 - - - - Principal Milestones Month & Year C. Equipment Installation Cost 0.560 - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - Sep 2022 / Sep 2025 Sep 2024 Apr 2026 G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost 3.260 - - - - Cost Elements ($ in Millions) Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 Base request. Procurement dollars supports modernization of the XM1113/XM1210 production line and completes installation of production equipment at Scranton Army Ammunition Plant (AAP). The Army has developed extended-range artillery projectiles to support its long-range, precision fires modernization objective. These new 155mm projectile metal parts will enter Full Rate Production (FRP). Current low-rate production is handled utilizing small batch type Flexible Manufacturing Cells and the M795 Rough Turn and Finish Turn lines. This equipment is unable to meet anticipated FRP quantities, and its use interferes with M795 production. This line will be a modern, robust and expandable manufacturing line capable of economically meeting anticipated XM1113/XM1210 production requirements at Scranton AAP. Funding supports modernization of the XM1113 and XM1210 production line. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 48 of 62 P-1 Line #35 Volume 1 - 866 === page 899 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Planning & Design in Support of Provision of Industrial Facilities Project Number: 5XX0000 Project Category: End Item Supported Model: Multiple Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Various Army Ammunition Plants Facility Location: Various Army Ammunition Plants Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost - - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - H. Other Costs 86.601 90.987 124.428 - 124.428 Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost 86.601 90.987 124.428 - 124.428 Cost Elements ($ in Millions) - Month & Year Oct 2024 / Sep 2027 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars in the amount of $124.428 million supports various engineering studies, digital engineering and analysis, preliminary and final designs in support of the Army Ammunition Plants (AAPs) at Holston, Iowa, Lake City, Radford, Scranton, Quad City Cartridge Case Facility, and Milan. Final design increases fidelity of cost estimates ensuring project continuity during construction. Two critical design projects to be awarded in FY 2027 include a new Bioplant at Radford AAP and an Industrial Wastewater Plant Upgrade and Distribution Replacement at Lake City AAP. These are critical infrastructure projects necessary to support operations at their respective plants while maintaining continuity during production. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 49 of 62 P-1 Line #35 Volume 1 - 867 === page 900 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Quality of Work Environment Upgrades Project Number: 5XX5405 Project Category: End Item Supported Model: Multiple Cost Elements ($ in Millions) Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Facility Name: Various Army Ammunition Plants Facility Location: Various Army Ammunition Plants 7.000 Facility Type (GOGO, GOCO, COCO): GOCO A. Construction Cost 3.500 4.000 7.000 - B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost - - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost 3.500 4.000 7.000 - 7.000 Month & Year Dec 2024 / Mar 2027 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars in the amount of $7.000 million supports quality of work environment upgrades to munition production lines and administrative/ operations buildings at various Army Ammunition Plants (AAPs). The AAPs, to include Holston, Lake City, Radford, Iowa, and Scranton, were constructed in the 1940s. While various modernization initiatives have upgrade antiquated production lines, the Plants continue to lack modernized support facilities. This effort will fund quality of work environment upgrades for production operations personnel. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 50 of 62 P-1 Line #35 Volume 1 - 868 === page 901 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Major Maintenance at GOCO AAPs Project Number: 5XX5406 Project Category: End Item Supported Model: Multiple Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Various Army Ammunition Plants Facility Location: Various Army Ammunition Plants Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost - - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs 31.653 37.500 25.300 - 25.300 Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost 31.653 37.500 25.300 - 25.300 Cost Elements ($ in Millions) Month & Year Oct 2024 / May 2027 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars in the amount of $25.300 million support major maintenance upgrades at various Army Ammunition Plants (AAPs), to include Holston, Lake City, Radford, Iowa, and Scranton. The major maintenance upgrades include, but are not limited to, repair of storage tanks to remediate environmental hazardous, replacement of deteriorated roofs, repair of infrastructure to maintain safe egress of ammunition and munitions components, and repairs to administrative/operations buildings. Additionally, project will replace outdated equipment and support replacement and upgrade of existing industrial operations information technology and operational technology systems at various AAPs. Program increase to repair and update facilities serving critical production capabilities. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 51 of 62 P-1 Line #35 Volume 1 - 869 === page 902 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Alternative and Advanced Manufacturing Technology (AAMT) Efficiencies Project Number: 5255172 Project Category: End Item Supported Model: 155mm Artillery and Components Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Various Army Ammunition Plants Facility Location: Various Army Ammunition Plants Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost 8.700 - - - - Principal Milestones C. Equipment Installation Cost 1.300 - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost 10.000 - - - - Cost Elements ($ in Millions) Month & Year Jul 2025 / Jan 2026 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 base request. Procurement funding addresses the urgent need to implement Alternative and Advanced Manufacturing Technology (AAMT) solutions to improve production efficiency and safety at Army Ammunition Plants (AAPs). This investment supports initiatives such as digital data capture, process automation, and environmental monitoring, tackling critical issues like process variability, outdated systems, and production bottlenecks. These advancements align with strategic goals to accelerate 155mm munitions production, including the Modular Artillery Charge System (MACS) and explosives, by addressing production challenges such as environmental sensitivity, material tracking, and process control. Furthermore, the phased implementation and integration of advanced technologies deliver sustainable benefits for maintaining and expanding production capabilities over the long term, ensuring operational continuity and enhanced efficiency. Received $10.000 million in FY 2025 from an approved reprogramming action. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 52 of 62 P-1 Line #35 Volume 1 - 870 === page 903 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Energetics Center of Excellence Project Number: 5265450 Project Category: End Item Supported Model: Propellants Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - 483.988 - - - Facility Name: Various Army Ammunition Plants Facility Location: Various Army Ammunition Plants Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - 134.412 - - - Principal Milestones C. Equipment Installation Cost - 270.877 - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - 13.723 - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost - - - - Cost Elements ($ in Millions) FY 2025 FY 2026 903.000 Month & Year Aug 2027 Sep 2026 / Mar 2027 Feb 2030 May 2029 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 Base request. Procurement dollars in the amount of $903.000 million supports a new Energetics Center of Excellence (ECE). This initiative aims to design, construct, commission, and operate a state-of-the-art, comprehensive, and efficient facility dedicated to advancing novel energetics. The primary objective is to create a domestic, Government-Owned (GO) or organic campus that will focus on increasing lethality and range for ordnance, propulsion, and weapon systems, ensuring overmatch lethality for the joint warfighter. The envisioned ECE will serve as a central hub within the organic industrial base for testing, scale-up, and production of nextgeneration energetic materials. This effort represents a critical step in maintaining technological superiority and enhancing the capabilities of the joint warfighter through innovative advancements in energetics. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 53 of 62 P-1 Line #35 Volume 1 - 871 === page 904 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Replace Test Instrumentation in Production Acceptance Testing (Ammunition) Project Number: 5XX5060 Project Category: End Item Supported Model: Initial Production Acceptance & Product Improvements for Ammunition Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Yuma Proving Ground / Aberdeen Test Center Facility Location: Yuma, Arizona / Aberdeen, Maryland Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost - - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs 0.794 0.795 0.798 - 0.798 Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost 0.794 0.795 0.798 - 0.798 Cost Elements ($ in Millions) Month & Year Dec 2024 / Sep 2027 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars in the amount of $0.798 million continues to support test mission activities at Aberdeen Test Center (ATC) and Yuma Test Center (YTC). Supports the procurement of ammunition/weapons components including gun mounts, gun tubes, breech assemblies, and other main weapon system components. These components are required to support proof and acceptance testing at ATC and Yuma Test Center YTC. Without these components, the Army will be unable to conduct the testing required to accept ammunition end items into its inventory and to mitigate operational risk due to ammunition shortfalls across the Army. At ATC, continues replacement and procurement for Weapon and Weapon Components which have experienced wear and tear during repetitive testing of production ammunition items. Typical purchases include: rifle/carbine/machine gun barrels, receivers, and parts; large caliber barrels; small and medium caliber Mann-type test barrels, mortar barrels and bipod/baseplates. Timely replacement of worn or unserviceable weapons/components will permit test execution without delays for acquisition of supporting equipment. At YTC, procures Ammo Components to continue support Production Acceptance Test (PAT) of artillery and mortar ammunition components at YTC throughout the year. Also procures replacement parts for large and small caliber direct fire weapon systems for production based support, which will improve weapon reliability and reduce potential testing downtime if sudden repairs are needed. This project increases test efficiencies and decreases costs and risks to Army Program Managers. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 54 of 62 P-1 Line #35 Volume 1 - 872 === page 905 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Modular Artillery Production Facility Project Number: 5255343 Project Category: End Item Supported Model: Artillery Annual Capacity Before / After (1-8-5): / FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost 162.500 - - - - Facility Name: Blue Grass Army Depot Facility Location: Richmond, KY Facility Type (GOGO, GOCO, COCO): GOGO B. Equipment Cost 75.000 - - - - Principal Milestones Month & Year C. Equipment Installation Cost 8.000 - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs 2.500 - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Apr 2026 / Oct 2026 Oct 2028 Jul 2028 Aug 2028 Apr 2029 Total Project Cost 248.000 - - - - Cost Elements ($ in Millions) FY 2025 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 Base request. Procurement dollars supports the establishment of a modular artillery production facility at Blue Grass Army Depot. The project will provide manufacturing capabilities for the XM1208 Cannon-Delivered Area Effects Munitions (C-DAEM), which serve as replacements for Dual Purpose Improved Conventional Munition (DPICM) artillery projectiles. The XM1208 is a critical solution addressing four Extremely High-Risk Capability Needs Analysis (CNA) gaps. It is the only 155mm projectile that complies with the Department of War's Cluster Munitions Policy, achieving a less than 1% unexploded ordnance (UXO) rate. Additionally, the XM1208 will replenish the current DPICM stockpile. The facility will also support future program variants with enhanced range and lethality. This effort will create a Continental United States (CONUS) capability within the Organic Industrial Base. Received $248.000 million of FY 2025 Congressional funding to support this effort. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 55 of 62 P-1 Line #35 Volume 1 - 873 === page 906 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Modernization and Infrastructure Upgrades Project Number: 5275344 Project Category: End Item Supported Model: Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC FY 2027 Total FY 2025 FY 2026 A. Construction Cost - - 89.404 - Facility Name: Blue Grass Army Depot Facility Location: Richmond, KY 89.404 Facility Type (GOGO, GOCO, COCO): GOGO B. Equipment Cost - - 25.544 - 25.544 Principal Milestones C. Equipment Installation Cost - - 12.772 - D. Contractor Support Cost - - - - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - - - 12.772 Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: - Total Project Cost - - - 127.720 Cost Elements ($ in Millions) 127.720 Project Number Month & Year Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars in the amount of $127.720 million supports modernization and infrastructure upgrades to ammunition production operations at Blue Grass Army Depot. The infrastructure modernization and upgrades to the Blue Grass Army Depot project aim to establish critical production capabilities while ensuring the facility meets modern operational standards. These efforts will include the installation of advanced equipment and systems to support the handling, storage, and production of energetics, enhancing safety and efficiency. By modernizing the plant, the project will strengthen the depot's ability to support the Army's munitions requirements and sustain readiness for future missions. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 56 of 62 P-1 Line #35 Volume 1 - 874 === page 907 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: B-Line East Cast-Cure Mixer Systems Project Number: 5275351 Project Category: End Item Supported Model: Cast-Cure filled Bombs Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC FY 2027 Total FY 2025 FY 2026 A. Construction Cost - - 2.735 - Facility Name: McAlester Army Ammunition Plant Facility Location: McAlester, OK 2.735 Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - 20.575 - 20.575 Principal Milestones C. Equipment Installation Cost - - 4.934 - D. Contractor Support Cost - - - - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - 1.756 - 4.934 Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: 1.756 Total Project Cost - - 30.000 - 30.000 Cost Elements ($ in Millions) Project Number Month & Year Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars in the amount of $30.000 million supports B-Line East Cast-Cure Mixer Systems upgrades at McAlester Army Ammunition Plant. This project will procure and install two high-shear mixers along with supporting ancillary equipment including screeners, conveyors, drum dumpers, scrubbers, and hot water power washers. Equipment will be installed in a new layout to improve operations. This project addresses a current single point failure of a single mixer and will increase manufacturing safety, readiness, production capacity, and surge capability while reducing operational costs for bomb programs supported by B-Line East. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 57 of 62 P-1 Line #35 Volume 1 - 875 === page 908 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Infrastructure Upgrades and Improvements Project Number: 5275345 Project Category: End Item Supported Model: Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC FY 2027 Total FY 2025 FY 2026 A. Construction Cost - - 9.554 - Facility Name: Pine Bluff Arsenal Facility Location: White Hall, AR 9.554 Facility Type (GOGO, GOCO, COCO): GOGO B. Equipment Cost - - 2.772 - 2.772 Principal Milestones C. Equipment Installation Cost - - 1.274 - D. Contractor Support Cost - - - - E. Corps of Engineers Support Cost - - - - F. Other In-House Support Cost - - - - G. Total Facility Project Cost - - - - H. Other Costs - - 0.749 - 1.274 Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: 0.749 Total Project Cost - - 14.349 - 14.349 Cost Elements ($ in Millions) Project Number Month & Year Title Related Projects FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars in the amount of $14.349 million supports infrastructure upgrades and improvements to ammunition production operations at Pine Bluff Arsenal. The infrastructure modernization and upgrades to Pine Bluff Arsenal aim to re-establish critical production capabilities while ensuring the facility meets modern operational standards. These efforts will include the installation of advanced equipment and systems to support the handling, storage, and production of energetics, enhancing safety and efficiency. By modernizing the plant, the project will strengthen the Army's ability to support munitions requirements and sustain readiness for future missions. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 58 of 62 P-1 Line #35 Volume 1 - 876 === page 909 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Ammunition Operations and Production Sustainment at GOGOs Project Number: 5275352 Project Category: End Item Supported Model: Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC FY 2027 Total FY 2025 FY 2026 A. Construction Cost - - 21.250 - Facility Name: Various Army Ammunition Plants (GOGOs) Facility Location: Various Army Ammunition Plants (GOGOs) 21.250 Facility Type (GOGO, GOCO, COCO): GOGO B. Equipment Cost - - 4.250 - 4.250 Principal Milestones C. Equipment Installation Cost - - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - 4.500 - 4.500 Total Project Cost - - 30.000 - 30.000 Cost Elements ($ in Millions) Month & Year Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars in the amount of $30.000 million supports sustainment for ammunition production operations at various Government Owned Government Operated facilities. Funding supports Government-owned, government-operated (GOGO) facilities to include, but not limited to Blue Grass Army Depot, Pine Bluff Arsenal, Crane Army Ammunition Activity, and McAlester Army Ammunition Plant. These GOGO facilities play a critical role in the production and procurement of ammunition to meet national defense requirements. These facilities ensure the reliable manufacturing of munitions while adhering to stringent safety and quality standards. Funding allocated to these operations will be used for sustainment activities, including infrastructure maintenance, and modernization of equipment to support long-term mission readiness. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 59 of 62 P-1 Line #35 Volume 1 - 877 === page 910 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Resilient Energetics Manufacturing Capability Project Number: 5265451 Project Category: End Item Supported Model: Advanced Energetics Annual Capacity Before / After (1-8-5): / FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - 11.992 - - - Facility Name: Various Army Ammunition Plants (GOGOs) Facility Location: Various Army Ammunition Plants (GOGOs) Facility Type (GOGO, GOCO, COCO): GOGO B. Equipment Cost - 38.974 - - - Principal Milestones C. Equipment Installation Cost - 8.994 - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs - - - - - Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost - 59.960 - - - Cost Elements ($ in Millions) FY 2025 FY 2026 Month & Year Feb 2028 Aug 2026 / Mar 2027 Aug 2029 Mar 2029 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: There is no FY 2027 Base request. Procurement dollars in the amount of $59.960 million supports resilient energetics manufacturing capability. The Resilient Energetics Manufacturing Capability project focuses on strengthening the Army's ammunition production and supply chain to ensure readiness and operational superiority. This project focuses on constructing and utilizing earth covered magazine (ECM) to use as flexible "processing cells" or "nano factories" to mature advanced energetic operations as an agile, low cost and low risk alternative to traditional "bricks and mortar" manufacturing sites. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 60 of 62 P-1 Line #35 Volume 1 - 878 === page 911 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Maintenance of Inactive Facilities Project Number: 5XX4073 Project Category: End Item Supported Model: Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Maintenance of Inactive Facilities Facility Location: Various AAPs Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost - - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs 4.977 6.634 6.716 - 6.716 Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost 4.977 6.634 6.716 - 6.716 Cost Elements ($ in Millions) Month & Year Nov 2024 / Apr 2027 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars in the amount $6.716 million supports the care and maintenance of laid-away equipment and facilities at active and inactive Army ammunition installations. This funding supports facilities that are no longer utilized for current production but are being retained for their additional capacity or capabilities. Maintenance activities include, but not limited to, inspection and corrective maintenance of lighting protection, fire suppression, utilities, sump pumps, friable asbestos, and pest control, and vegetation control. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 61 of 62 P-1 Line #35 Volume 1 - 879 === page 912 === UNCLASSIFIED Date: April 2026 Exhibit P-25, Production Support and Industrial Facilities Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 P-1 Line Item Number / Title: 0572EP1000 / Industrial Facilities Project Title: Layaway of Industrial Facilities Project Number: 5XX8000 Project Category: End Item Supported Model: Annual Capacity Before / After (1-8-5): / FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total A. Construction Cost - - - - - Facility Name: Layaway Of Industrial Facilities Facility Location: Various AAPs Facility Type (GOGO, GOCO, COCO): GOCO B. Equipment Cost - - - - - Principal Milestones C. Equipment Installation Cost - - - - - D. Contractor Support Cost - - - - - E. Corps of Engineers Support Cost - - - - - F. Other In-House Support Cost - - - - - G. Total Facility Project Cost - - - - - H. Other Costs 9.457 10.052 11.918 - 11.918 Concept Design Complete: Final Design Complete: Initial/Final Project Award: Construction Complete: Equipment Installation Complete: Prove Out Begins: Prove Out Complete: Total Project Cost 9.457 10.052 11.918 - 11.918 Cost Elements ($ in Millions) Month & Year Oct 2024 / May 2027 Related Projects Project Number Title FY & Appn Value ($ M) Facing Start Date Compl Date Narrative Explanation: FY 2027 Base procurement dollars in the amount of $11.918 million supports the protection and preservation of industrial facilities at active and inactive Army ammunition installations to include, but not limited to, Government-Owned Contractor-Operated (GOCO) facilities such as Holston, Iowa, Lake City, Milan, Radford, and Scranton Army Ammunition Plants (AAP), Pine Bluff Arsenal, and Quad Cities Cartridge Case Facility. Funds support layaway of facilities and equipment that are no longer required for current production but must be retained for future peacetime or emergency production needs. Funds also supports the decontamination and demolition of excess production equipment and facilities buildings. LI 0572EP1000 - Industrial Facilities Army UNCLASSIFIED Page 62 of 62 P-1 Line #35 Volume 1 - 880 === page 913 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 02: Ammunition Production Base Support / BSA 10: Production Base Support P-1 Line Item Number / Title: 4099EP1700 / Conventional Munitions Demilitarization Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 4,119.350 4,119.350 4,119.350 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 135.649 135.649 135.649 155.050 155.050 155.050 161.179 161.179 161.179 - 161.179 161.179 161.179 169.417 169.417 169.417 169.074 169.074 169.074 169.963 169.963 169.963 To FY 2031 Complete 172.048 172.048 172.048 Total - 5,251.730 - 5,251.730 - 5,251.730 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Conventional Munitions Demilitarization Program provides for the demilitarization (demil) and disposal of conventional ammunition and missiles that are unserviceable, obsolete, or excess to need for all Military Services per DoDD 5160.65 and DoDI 5160.68. The program accomplishes demil using open burning/open detonation (OB/OD) processes or closed disposal technologies (CDT) with primary emphasis on resource recovery and recycling (R3). This program also provides technical support and services; packaging, crating, handling, and transportation (PCHT) of ammunition for demil projects at United States Army depots, plants and activities; commercial contracts that provide closed disposal technologies demil support and services and associated packaging, crating, handling, and transportation; and international operations, which include the European and Pacific Theaters. LI 4099EP1700 - Conventional Munitions Demilitarization Army UNCLASSIFIED Page 1 of 8 P-1 Line #36 Volume 1 - 881 === page 914 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 02: Ammunition Production Base Support / BSA 10: Production Base Support P-1 Line Item Number / Title: 4099EP1700 / Conventional Munitions Demilitarization Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 EP1800 / Conventional Ammunition Demilitarization (SMCA) / 3,342.425 - / 104.093 - / 122.994 / 130.036 - / - P-5 EP1801 / Other Non-Army Service Demil Items (non-SMCA) - / 125.791 - / 12.374 - / 10.189 - / 8.489 - / - - / 8.489 P-5 EP1802 / Army Missile Demilitarization - / 587.028 - / 14.011 - / 11.902 - / 12.590 - / - - / 12.590 P-5 EP1803 / Non-Army Missile Demilitarization P-40 Total Gross/Weapon System Cost - - / 64.106 / 4,119.350 - / 5.171 / 135.649 - - - / 130.036 / 9.965 - / 10.064 - / - - / 10.064 / 155.050 - / 161.179 - / - - / 161.179 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Base procurement dollars in the amount of $161.179 million will support the United States demilitarization (demil) and disposition of 26,617 tons of conv ammo and 4,858 tons of missile/components. This work is to be accomplished in both Continental United States (CONUS) and Outside the Continental United States (OCONUS). CONUS demil operations are performed by a combination of Government Owned, Government Operated (GOGO) facilities, Government Owned, Contractor Operated (GOCO) facilities as well as commercial contractors. Demil operations will focus on reducing the munitions with most tonnage, such as, Depleted Uranium (DU) munitions, 155mm High Explosive Anti-Personnel projectiles (ICM M449E1/E2), Anti-Personnel Landmines, Cluster Bomb munitions (CBU), Small Arm munitions, Various Missiles, Rocket Motors and Multiple Launch Rocket Motors. OCONUS demil operations are performed at Demilitarization Facilities in Japan as well as commercial contractors in the European Union. Cost increases in the various categories of the P-5 Cost Analysis Forms reflect decreases in quantities and tonnage of munitions being destroyed within those cost categories, and transportation to relocate munitions to sites with the capability to properly demilitarize and dispose. As of 4 December 2025, the Single Manager for Conventional Ammunition (SMCA) Resource, Recovery and Disposition Account (B5A) contained 296,534 tons of ammunition in storage consisting of 246,681 tons of conventional ammunition and 49,853 tons of Missile Components. Reduction of the B5A account provides mission readiness to access munition, storage management efficiency of serviceable items, and available storage for newly produced munitions. Safety and environmental risks associated with emergency demil will increase with aging stockpile resulting in increased risk due to degrading munitions and increased costs to maintain required safety in storage inspections. Demil and Disposal of Conventional Munitions reduces the Demil stockpile, which allows for storage of newly produced ammunition. Stockpile generations are forecast to increase over FY27-31 and increased demil tonnage will be required. LI 4099EP1700 - Conventional Munitions Demilitarization Army UNCLASSIFIED Page 2 of 8 P-1 Line #36 Volume 1 - 882 === page 915 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4099EP1700 / Conventional Munitions Demilitarization Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: EP1800 / Conventional Ammunition Demilitarization (SMCA) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) - 3,342.425 Less PY Advance Procurement ($ in Millions) 104.093 - Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) 130.036 - - - 122.994 130.036 - 130.036 - 104.093 FY 2027 Total - - 122.994 - 3,342.425 - - 104.093 - Total Obligation Authority ($ in Millions) FY 2027 OOC - 122.994 - 3,342.425 FY 2027 Base - 130.036 - 130.036 - - 130.036 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Support - Demilitarization Cost WHITE PHOSPHORUS - - 102.229 - - - - - - - - - - - - - - - DEMOLITION MATERIAL - - 6.214 - - - - - - - - 10.000 - - - - - 10.000 HE DETONATORS/ BOOSTERS - - 5.334 - - - - - - - - - - - - - - - HE BOMBS - - 49.067 - - 1.674 - - 2.750 - - 1.341 - - - - - 1.341 HE CARTRIDGES - - 184.478 - - 1.422 - - 6.156 - - - - - - - - - GRENADES - - 5.140 - - - - - - - - - - - - - - - HE DEPTH CHARGES - - 17.572 - - - - - - - - - - - - - - - CLUSTER BOMBS/ ICM; ANTI-TANK & PERSONNEL - - 377.895 - - 16.172 - - 9.385 - - 39.752 - - - - - 39.752 HE LAND MINES - - 90.317 - - - - - - - - - - - - - - - INERT - - 40.246 - - - - - - - - - - - - - - - MULTIPLE FAMILY - - 539.223 - - 6.181 - - 11.647 - - 8.662 - - - - - 8.662 BULK HIGH EXPLOSIVES - - 127.180 - - - - - - - - - - - - - - - PROPELLANT CHARGES/INCREMENT CHARGES - - 158.803 - - 0.456 - - - - - - - - - - - - TARGET PRACTICES/ 40MM ANTI-AIRCRAFT - - 52.158 - - 2.937 - - - - - - - - - - - - SMALL ARMS AMMO THRU 20MM - - 47.024 - - 6.006 - - 2.553 - - 5.541 - - - - - 5.541 LI 4099EP1700 - Conventional Munitions Demilitarization Army UNCLASSIFIED Page 3 of 8 P-1 Line #36 Volume 1 - 883 === page 916 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4099EP1700 / Conventional Munitions Demilitarization Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: EP1800 / Conventional Ammunition Demilitarization (SMCA) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) INCINERABLE MUNITIONS/ MISCELLANEOUS - - FUZES - TRANSPORTATION - MUNITIONS CHARACTERIZATION OCONUS DEMIL EUCOM ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) Qty (Each) Unit Cost ($ M) 84.956 - - 1.503 - - 1.392 - - - 55.862 - - 2.157 - - 0.951 - - 240.162 - - 8.381 - - 9.228 - - - 93.245 - - 2.813 - - 3.328 - - 49.187 - - 0.054 - - OCONUS DEMIL PACOM - - 12.029 - - 0.300 - CONTRACT - CONUS DEMIL - - 881.151 - - 37.129 DU Cartridges - - 35.384 - - ROCKET MOTORS - - 2.674 - - Smoke Illum - - 1.948 - SMOKE/RIOT CONTROL - - - - - - Subtotal: Support - Program Management Cost Gross/Weapon System Cost Subtotal: Support Demilitarization Cost FY 2027 OOC Total Cost ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) - - - - - - - - - - - - - - - - 6.585 - - - - - 6.585 - - 3.000 - - - - - 3.000 - - - 0.100 - - - - - 0.100 - 0.372 - - 0.300 - - - - - 0.300 - - 31.148 - - 33.214 - - - - - 33.214 10.036 - - 15.798 - - 16.836 - - - - - 16.836 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3.434 - - - - - 2.705 - - - - - 2.705 3,259.478 - - 100.655 - - 94.708 - - 128.036 - - - - - 128.036 - 82.947 - - 3.438 - - 28.286 - - 2.000 - - - - - 2.000 - - 82.947 - - 3.438 - - 28.286 - - 2.000 - - - - - 2.000 - - 3,342.425 - - 104.093 - - 122.994 - - 130.036 - - - - - 130.036 Support - Program Management Cost Government Management Remarks: Cost increases in the various categories of the P-5 Cost Analysis Forms reflect adjustments in quantities and tonnage of munitions being destroyed within those cost categories, and transportation to relocate munitions to sites with the capability to properly demilitarize and dispose. LI 4099EP1700 - Conventional Munitions Demilitarization Army UNCLASSIFIED Page 4 of 8 P-1 Line #36 Volume 1 - 884 === page 917 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4099EP1700 / Conventional Munitions Demilitarization Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: EP1801 / Other Non-Army Service Demil Items (non-SMCA) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 12.374 10.189 8.489 - 8.489 - Gross/Weapon System Cost ($ in Millions) 125.791 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 125.791 Plus CY Advance Procurement ($ in Millions) - - - - - 12.374 10.189 8.489 - 8.489 - Total Obligation Authority ($ in Millions) 125.791 FY 2027 Total - - - - - 12.374 10.189 8.489 - 8.489 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Support - Demilitarization Cost TORPEDOES - - 44.885 - - - - - - - - - - - - - - - SONOBUOYS - - 4.733 - - - - - - - - - - - - - - - CONTRACT - CONUS DEMIL - - 31.372 - - - - - - - - - - - - - - - TRANSPORTATION - - 4.190 - - - - - - - - - - - - - - - MULTIPLE FAMILY - - 1.503 - - - - - 3.189 - - - - - - - - - HE BOMBS - - 1.097 - - - - - 1.000 - - - - - - - - - CLUSTER BOMBS/ ICM; ANTI-TANK & PERSONNEL - - 19.093 - - 12.374 - - 6.000 - - 8.489 - - - - - 8.489 DU Cartridges - - 18.918 - - - - - - - - - - - - - - - Subtotal: Support Demilitarization Cost - - 125.791 - - 12.374 - - 10.189 - - 8.489 - - - - - 8.489 Gross/Weapon System Cost - - 125.791 - - 12.374 - - 10.189 - - 8.489 - - - - - 8.489 Remarks: Cost increases in the various categories of the P-5 Cost Analysis Forms reflect adjustments in quantities and tonnage of munitions being destroyed within those cost categories. LI 4099EP1700 - Conventional Munitions Demilitarization Army UNCLASSIFIED Page 5 of 8 P-1 Line #36 Volume 1 - 885 === page 918 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4099EP1700 / Conventional Munitions Demilitarization Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: EP1802 / Army Missile Demilitarization MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 14.011 11.902 12.590 - 12.590 - Gross/Weapon System Cost ($ in Millions) 587.028 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 587.028 Plus CY Advance Procurement ($ in Millions) - - - - - 14.011 11.902 12.590 - 12.590 - Total Obligation Authority ($ in Millions) 587.028 FY 2027 Total - - - - - 14.011 11.902 12.590 - 12.590 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Support - Demilitarization Cost MULTIPLE LAUNCH ROCKET SYSTEM - - 257.312 - - 1.900 - - 4.346 - - 1.179 - - - - - 1.179 ROCKET MOTORS - - 11.742 - - 0.594 - - 1.278 - - 0.307 - - - - - 0.307 TOW CD/R3 - - 42.050 - - 0.014 - - 0.014 - - 0.020 - - - - - 0.020 HELLFIRE - - 0.676 - - 0.009 - - 0.033 - - 0.030 - - - - - 0.030 STINGER - - 2.596 - - - - - - - - - - - - - - - PATRIOT - - 5.544 - - 0.907 - - 0.673 - - 0.727 - - - - - 0.727 HONEST JOHN - - 2.522 - - 0.757 - - 0.080 - - 0.328 - - - - - 0.328 MISSILE COMPONENTS - - 74.243 - - 0.911 - - 0.652 - - 0.709 - - - - - 0.709 HAWK MOTORS - - 4.994 - - - - - 0.280 - - - - - - - - - DEMIL PROCESS IMPROVEMENTS - - 100.671 - - 1.275 - - 0.750 - - 0.750 - - - - - 0.750 TRANSPORTATION - - 28.713 - - 1.168 - - 1.296 - - 2.010 - - - - - 2.010 MULTIPLE FAMILY - - 8.935 - - - - - - - - - - - - - - - CONTRACT - CONUS DEMIL - - 2.241 - - 3.656 - - - - - 3.758 - - - - - 3.758 - - 542.239 - - 11.191 - - 9.402 - - 9.818 - - - - - 9.818 - - 44.789 - - 2.820 - - 2.500 - - 2.772 - - - - - 2.772 - - 44.789 - - 2.820 - - 2.500 - - 2.772 - - - - - 2.772 Subtotal: Support Demilitarization Cost Support - Program Management Cost Government Management Subtotal: Support - Program Management Cost LI 4099EP1700 - Conventional Munitions Demilitarization Army UNCLASSIFIED Page 6 of 8 P-1 Line #36 Volume 1 - 886 === page 919 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4099EP1700 / Conventional Munitions Demilitarization Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: EP1802 / Army Missile Demilitarization MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Gross/Weapon System Cost Unit Cost ($) - FY 2025 Total Cost Qty (Each) ($ M) - 587.028 Unit Cost ($) Qty (Each) - FY 2026 Total Cost ($ M) - 14.011 Unit Cost ($) - FY 2027 Base Total Cost Qty (Each) ($ M) - 11.902 Unit Cost ($) - FY 2027 OOC Total Cost Qty (Each) ($ M) - 12.590 Unit Cost ($) - FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) - ($) - - Total Cost Qty (Each) ($ M) - 12.590 Remarks: Cost increases in the various categories of the P-5 Cost Analysis Forms reflect adjustments in quantities and tonnage of munitions being destroyed within those cost categories, and transportation to relocate munitions to sites with the capability to properly demilitarize and dispose. LI 4099EP1700 - Conventional Munitions Demilitarization Army UNCLASSIFIED Page 7 of 8 P-1 Line #36 Volume 1 - 887 === page 920 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 4099EP1700 / Conventional Munitions Demilitarization Appropriation / Budget Activity / Budget Sub Activity: 2034A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: EP1803 / Non-Army Missile Demilitarization MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 64.106 5.171 9.965 10.064 - 10.064 - - - - - - 64.106 5.171 9.965 10.064 - 10.064 - - - - - - 64.106 5.171 9.965 10.064 - 10.064 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($) Total Cost Qty (Each) ($ M) Support - Demilitarization Cost HE MISSILES - - 40.307 - - 0.300 - - 1.270 - - 3.198 - - - - - 3.198 ROCKET MOTORS - - 9.134 - - 2.142 - - 2.500 - - 3.605 - - - - - 3.605 MISSILE COMPONENTS - - 5.463 - - 0.815 - - 3.152 - - 1.246 - - - - - 1.246 Demilitarization - - 1.021 - - - - - 0.029 - - - - - - - - - Maverick Missile - - 4.444 - - 0.399 - - 1.499 - - 0.500 - - - - - 0.500 Tomahawk - - 3.737 - - 1.515 - - 1.515 - - 1.515 - - - - - 1.515 Subtotal: Support Demilitarization Cost - - 64.106 - - 5.171 - - 9.965 - - 10.064 - - - - - 10.064 Gross/Weapon System Cost - - 64.106 - - 5.171 - - 9.965 - - 10.064 - - - - - 10.064 Remarks: Cost increases in the various categories of the P-5 Cost Analysis Forms reflect adjustments in quantities and tonnage of munitions being destroyed within those cost categories. LI 4099EP1700 - Conventional Munitions Demilitarization Army UNCLASSIFIED Page 8 of 8 P-1 Line #36 Volume 1 - 888 === page 921 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2034A: Procurement of Ammunition, Army / BA 02: Ammunition Production Base Support / BSA 10: Production Base Support P-1 Line Item Number / Title: 4150EP2500 / ARMS Initiative Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 385.119 385.119 385.119 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 4.140 3.885 3.935 - 3.935 4.040 4.081 4.104 4.145 - - - - - - - - - - - 4.140 3.885 3.935 - 3.935 4.040 4.081 4.104 4.145 - - - - - - - - - - - 4.140 3.885 3.935 - 3.935 4.040 4.081 4.104 4.145 - Total 413.449 413.449 413.449 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: The Armament Retooling and Manufacturing Support (ARMS) program reuses idle capacity at active and inactive Government-Owned, Contractor-Operated (GOCO) Army Ammunition Plants and the GOCO Hawthorne Army Depot through commercialization. Congress enacted this program in the FY 1993 Defense Authorization Act (Public Law (PL) 102-484) and codified in FY 2000 (10 U.S.C. 7551-7555). ARMS resources are used for facility strategic reuse plans, marketing plans, building renovation and recapitalization, equipment purchase, relocation, or consolidation, as well as environmental baseline studies and site surveys to encourage commercial use of underutilized Army assets, to include underutilized land available for greenfield construction. The ARMS objectives include sustaining critical manufacturing capabilities and critical skills; reducing facility operating and maintenance costs; decreasing product cost; providing opportunities for small business; and accelerating private sector economic development, employment and investment. The ARMS program allows the Army to manage portions of the ammunition infrastructure as a commercial business without encumbering production operations in support of DOW Joint Warfighter ammunition requirements. This management concept has allowed the Army to apply overhead costs across multiple commercial contracts to reduce operating costs. Justification: FY 2027 Base procurement dollars in the amount of $3.935 million supports financial and marketing investments to attract revenue-producing tenants to locate on Government-Owned Contractor-Operated (GOCO) Army Ammunition Plants and the GOCO Hawthorne Army Depot. The ARMS program reduces Army cost of ownership and maintains critical munitions industrial base skills. Revenues collected will be utilized to reduce overhead and total annual operating costs, improve and maintain existing buildings for current tenants, and perform improvements to other vacant buildings to entice potential tenants. LI 4150EP2500 - ARMS Initiative Army UNCLASSIFIED Page 1 of 1 P-1 Line #37 Volume 1 - 889