=== page 1 === UNCLASSIFIED Department of War Fiscal Year (FY) 2027 Budget Estimates April 2026 Army Justification Book Volume 1 of 1 Aircraft Procurement, Army UNCLASSIFIED === page 2 === === page 3 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Volume 1 Table of Contents Introduction and Explanation of Contents................................................................................................................Volume 1 - ii Comptroller Exhibit P-1..............................................................................................................................................Volume 1 - iv Line Item Table of Contents (by Appropriation then Line Number).................................................................... Volume 1 - xxi Line Item Table of Contents (Alphabetically by Line Item Title)........................................................................ Volume 1 - xxiv Exhibit P-1M, Procurement Programs - Modification Summary........................................................................ Volume 1 - xxvi Exhibit P-40s................................................................................................................................................................ Volume 1 - 1 UNCLASSIFIED Volume 1 - i === page 4 === === page 5 === Cost Statement The following Justification Books were prepared at a cost of $337,499.00: Aircraft (ACFT), Missile (MSLS), Weapons & Tracked Combat Vehicles (WTCV), Ammunition (AMMO), Other Procurement Army (OPA) 1 - Tactical & Support Vehicles, Other Procurement Army (OPA) 2 - Communications & Electronics, Other Procurement Army (OPA) 3 & 4 - Other Support Equipment & Spares, Research, Development, Test and Evaluation (RDTE) for: Budget Activity 1, Budget Activity 2, Budget Activity 3, Budget Activity 4A, Budget Activity 4B, Budget Activity 5A, Budget Activity 5B, Budget Activity 5C, Budget Activity 5D, Budget Activity 6, Budget Activity 7 and Budget Activity 8. Volume 1 - ii === page 6 === AIRCRAFT PROCUREMENT, ARMY Appropriation Language For construction, procurement, production, and modification of aircraft, equipment, including ordnance, spare parts, and accessories therefore; specialized equipment and training devices; expansion of public and private plants, including the land necessary therefore, for the foregoing purposes, and such lands and interests therein, may be acquired, and construction prosecuted thereon prior to approval of title; and procurement and installation of equipment, appliances, and machine tools in public and private plants; reserve plant and government and contractor-owned equipment layaway; and other expenses necessary for the foregoing purposes, $1,933,769,000 to remain available for obligation until September 30, 2029. Volume 1 - iii === page 7 === Volume 1 - iv === page 8 === Volume 1 - v === page 9 === Volume 1 - vi === page 10 === Volume 1 - vii === page 11 === Volume 1 - viii === page 12 === Volume 1 - ix === page 13 === Volume 1 - x === page 14 === Volume 1 - xi === page 15 === Volume 1 - xii === page 16 === Volume 1 - xiii === page 17 === Volume 1 - xiv === page 18 === Volume 1 - xv === page 19 === Volume 1 - xvi === page 20 === Volume 1 - xvii === page 21 === Volume 1 - xviii === page 22 === Volume 1 - xix === page 23 === 012345672ÿ94 ÿÿ 63 5ÿ342 25ÿ ÿÿ ÿ )*+,-./*012-3ÿ ?21@2/0-3ÿ 5ÿ  2ÿÿÿ46ÿ72762ÿ ÿ !ÿ"#$%ÿ ÿ 'ÿ"#$%ÿ ÿ (ÿ"#$%ÿ 456757689:ÿ 456;<765<=ÿ 4:6>5569;>ÿ 48ÿ 4==86:58ÿ 48ÿ #A!A!(ÿ #B'!B!Bÿ #CAA('Cÿ  2ÿÿD2562ÿE 5 ÿF 2G45ÿ FHIÿ J2336656ÿF6ÿ652ÿ ÿ !ÿ"#$%ÿ L , 2M*1NÿO0PQ,0+/ÿR.2S01+ÿ >;9;9VK:<788ÿ L,2M*1N*1ÿO0 48ÿ /0ÿT-0@U,/*01ÿ =9=V6888ÿ 4:;6:58ÿ #BB A ÿ ÿ (ÿ"#$%ÿ 48ÿ 48ÿ 48ÿ 48ÿ #ÿ ÿ _`ab`cdefÿhiabjakÿlimcjhjn`cjdaoÿÿÿ cpqÿhfÿrsrtÿuvqwxÿvyzwÿz{|}w~ÿ|€ÿ̀€‚€z~ÿƒ€|‚}€q{qw~„ÿ`€{ ÿw‚y}xquÿ†‡„trˆ„‡r‰ÿ~p|}uzwxÿ|ÿxu‚€q~|wz€ÿzwxÿ†‰‰s„Їsÿ ~p|}uzwxÿ|ÿ{zwxz~|€ÿ‹€q‚|w‚yz~|wŒÿ|€ÿzÿ~|~zyÿ|ÿ†‰„stˆ„‰ˆ‰ÿ~p|}uzwxÿ ÿ ÿ Volume 1 - xx === page 24 === === page 25 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (by Appropriation then Line Number) Appropriation 2031A: Aircraft Procurement, Army Line # BA BSA Line Item Number Line Item Title Page 1 01 10 9670A00005 MQ-1 UAV..............................................................................................................................................Volume 1 - 1 2 01 10 9672A00510 Future UAS Family................................................................................................................................ Volume 1 - 2 3 01 10 9678A12500 SMALL UNMANNED AIRCRAFT SYSTEMS........................................................................................ Volume 1 - 4 4 01 10 9681A14000 UNMANNED AIRCRAFT SYSTEMS (UAS)........................................................................................ Volume 1 - 12 5 01 10 9697A12400 HADES PLATFORM, PAYLOADS/PED, AND INTEGRATION........................................................... Volume 1 - 17 6 01 20 4742A05001 UH-72 LAKOTA LIGHT UTILITY HELICOPTER................................................................................. Volume 1 - 28 7 01 20 5757A05111 AH-64 Apache Block IIIA Reman........................................................................................................ Volume 1 - 29 8 01 20 6761A12000 Future Vertical Lift FAMILY OF SYSTEMS......................................................................................... Volume 1 - 34 9 01 20 6761A12000 Future Vertical Lift FAMILY OF SYSTEMS, Advance Procurement.................................................... Volume 1 - 38 10 01 20 6771AA0005 UH-60 Blackhawk M Model (MYP)...................................................................................................... Volume 1 - 42 11 01 20 6771AA0005 UH-60 Blackhawk M Model (MYP), Advance Procurement.................................................................Volume 1 - 52 12 01 20 6775A05101 CH-47 Helicopter..................................................................................................................................Volume 1 - 56 13 01 20 6775A05101 CH-47 Helicopter, Advance Procurement............................................................................................Volume 1 - 69 14 01 20 9990A19900 Spectrum Army SUAS......................................................................................................................... Volume 1 - 73 UNCLASSIFIED Volume 1 - xxi === page 26 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Appropriation 2031A: Aircraft Procurement, Army Line # BA BSA Line Item Number Line Item Title Page 15 02 10 0023A01001 MQ-1 PAYLOAD.................................................................................................................................. Volume 1 - 74 16 02 10 0756AA6601 Gray Eagle Mods2............................................................................................................................... Volume 1 - 77 17 02 10 2706AA6605 AH-64 MODS....................................................................................................................................... Volume 1 - 79 18 02 10 2724A12700 SCALABLE CONTROL INTERFACE (SCI)....................................................................................... Volume 1 - 106 19 02 10 3264AA0252 CH-47 Cargo Helicopter Mods (MYP)............................................................................................... Volume 1 - 107 20 02 10 6949AA0480 Utility Helicopter Mods....................................................................................................................... Volume 1 - 127 21 02 10 8658AA0712 Network And Mission Plan.................................................................................................................Volume 1 - 137 22 02 10 8659AA0723 Comms, Nav Surveillance..................................................................................................................Volume 1 - 150 23 02 10 8660A00713 Degraded Visual Environment........................................................................................................... Volume 1 - 170 24 02 10 8662A01006 Aviation ASSURED PNT....................................................................................................................Volume 1 - 172 25 02 10 8859AA0711 GATM Rollup......................................................................................................................................Volume 1 - 182 26 02 10 9556A01002 UAS MODS........................................................................................................................................ Volume 1 - 184 UNCLASSIFIED Volume 1 - xxii === page 27 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Appropriation 2031A: Aircraft Procurement, Army Line # BA BSA Line Item Number Line Item Title Page 27 04 10 3632AZ3504 Aircraft Survivability Equipment......................................................................................................... Volume 1 - 186 28 04 10 5397AZ3517 CMWS................................................................................................................................................ Volume 1 - 201 29 04 10 5399AZ3537 Common Infrared Countermeasures (CIRCM).................................................................................. Volume 1 - 209 30 04 30 5212AZ3100 Common Ground Equipment............................................................................................................. Volume 1 - 220 31 04 30 6380AZ3110 Aircrew Integrated Systems............................................................................................................... Volume 1 - 224 32 04 30 6818AA0050 Air Traffic Control...............................................................................................................................Volume 1 - 228 33 04 30 9154A50100 Launcher, 2.75 Rocket.......................................................................................................................Volume 1 - 233 34 04 30 9157J01200 Launcher Guided Missile: Longbow Hellfire XM299.......................................................................... Volume 1 - 234 UNCLASSIFIED Volume 1 - xxiii === page 28 === === page 29 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Line Item Table of Contents (Alphabetically by Line Item Title) Line Item Title Line Item Number Line # BA BSA Page AH-64 Apache Block IIIA Reman 5757A05111 7 01 20..................... Volume 1 - 29 AH-64 MODS 2706AA6605 17 02 10..................... Volume 1 - 79 Air Traffic Control 6818AA0050 32 04 30................... Volume 1 - 228 Aircraft Survivability Equipment 3632AZ3504 27 04 10................... Volume 1 - 186 Aircrew Integrated Systems 6380AZ3110 31 04 30................... Volume 1 - 224 Aviation ASSURED PNT 8662A01006 24 02 10................... Volume 1 - 172 CH-47 Cargo Helicopter Mods (MYP) 3264AA0252 19 02 10................... Volume 1 - 107 CH-47 Helicopter 6775A05101 12 01 20..................... Volume 1 - 56 CH-47 Helicopter, Advance Procurement 6775A05101 13 01 20..................... Volume 1 - 69 CMWS 5397AZ3517 28 04 10................... Volume 1 - 201 Common Ground Equipment 5212AZ3100 30 04 30................... Volume 1 - 220 Common Infrared Countermeasures (CIRCM) 5399AZ3537 29 04 10................... Volume 1 - 209 Comms, Nav Surveillance 8659AA0723 22 02 10................... Volume 1 - 150 Degraded Visual Environment 8660A00713 23 02 10................... Volume 1 - 170 Future UAS Family 9672A00510 2 01 10....................... Volume 1 - 2 Future Vertical Lift FAMILY OF SYSTEMS 6761A12000 8 01 20..................... Volume 1 - 34 Future Vertical Lift FAMILY OF SYSTEMS, Advance Procurement 6761A12000 9 01 20..................... Volume 1 - 38 UNCLASSIFIED Volume 1 - xxiv === page 30 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page GATM Rollup 8859AA0711 25 02 10................... Volume 1 - 182 Gray Eagle Mods2 0756AA6601 16 02 10..................... Volume 1 - 77 HADES PLATFORM, PAYLOADS/PED, AND INTEGRATION 9697A12400 5 01 10..................... Volume 1 - 17 Launcher Guided Missile: Longbow Hellfire XM299 9157J01200 34 04 30................... Volume 1 - 234 Launcher, 2.75 Rocket 9154A50100 33 04 30................... Volume 1 - 233 MQ-1 PAYLOAD 0023A01001 15 02 10..................... Volume 1 - 74 MQ-1 UAV 9670A00005 1 01 10....................... Volume 1 - 1 Network And Mission Plan 8658AA0712 21 02 10................... Volume 1 - 137 SCALABLE CONTROL INTERFACE (SCI) 2724A12700 18 02 10................... Volume 1 - 106 SMALL UNMANNED AIRCRAFT SYSTEMS 9678A12500 3 01 10....................... Volume 1 - 4 Spectrum Army SUAS 9990A19900 14 01 20..................... Volume 1 - 73 UAS MODS 9556A01002 26 02 10................... Volume 1 - 184 UH-60 Blackhawk M Model (MYP) 6771AA0005 10 01 20..................... Volume 1 - 42 UH-60 Blackhawk M Model (MYP), Advance Procurement 6771AA0005 11 01 20..................... Volume 1 - 52 UH-72 LAKOTA LIGHT UTILITY HELICOPTER 4742A05001 6 01 20..................... Volume 1 - 28 UNMANNED AIRCRAFT SYSTEMS (UAS) 9681A14000 4 01 10..................... Volume 1 - 12 Utility Helicopter Mods 6949AA0480 20 02 10................... Volume 1 - 127 UNCLASSIFIED Volume 1 - xxv === page 31 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Exhibit P-1M, Procurement Programs - Modification Summary (Listing by Model) Lookup Matrix by Model Model: Longbow Apache P-3a Individual Modifications Modification Number AA6606 Modification Title AH-64 APACHE MODS Applies to Multiple Models No Model: CH-47 P-3a Individual Modifications Modification Number AA0252 Modification Title CH-47 Cargo Helicopter Mods (MYP) Applies to Multiple Models No Model: UH-60 P-3a Individual Modifications Modification Number AA0492 Modification Title UTILITY HELICOPTER MODS Applies to Multiple Models Yes Model: UH-72 P-3a Individual Modifications Modification Number Modification Title Applies to Multiple Models AA0492 UTILITY HELICOPTER MODS Yes AA0712 Network And Mission Plan Yes UNCLASSIFIED Exhibit P-1M, Procurement Programs - Modification Summary Page 1 of 5 Volume 1 - xxvi === page 32 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Exhibit P-1M, Procurement Programs - Modification Summary (Listing by Model) Model: AH-64D/E P-3a Individual Modifications Modification Number Modification Title Applies to Multiple Models AA0712 Network And Mission Plan Yes AA0723 Comms, Nav Surveillance Yes A01006 Aviation ASSURED PNT Yes Model: CH-47D/F P-3a Individual Modifications Modification Number AA0712 Modification Title Network And Mission Plan Applies to Multiple Models Yes Model: UH-60A/L/M/Q/V P-3a Individual Modifications Modification Number AA0712 Modification Title Network And Mission Plan Applies to Multiple Models Yes Model: HH-60L/M P-3a Individual Modifications Modification Number AA0712 Modification Title Network And Mission Plan Applies to Multiple Models Yes UNCLASSIFIED Exhibit P-1M, Procurement Programs - Modification Summary Page 2 of 5 Volume 1 - xxvii === page 33 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Exhibit P-1M, Procurement Programs - Modification Summary (Listing by Model) Model: EMARSS P-3a Individual Modifications Modification Number AA0712 Modification Title Network And Mission Plan Applies to Multiple Models Yes Model: UAS P-3a Individual Modifications Modification Number Modification Title Applies to Multiple Models AA0712 Network And Mission Plan Yes AA0723 Comms, Nav Surveillance Yes A01006 Aviation ASSURED PNT Yes Model: UH/HH-60A/L P-3a Individual Modifications Modification Number AA0723 Modification Title Comms, Nav Surveillance Applies to Multiple Models Yes Model: UH/HH/MH-60M P-3a Individual Modifications Modification Number Modification Title Applies to Multiple Models AA0723 Comms, Nav Surveillance Yes A01006 Aviation ASSURED PNT Yes UNCLASSIFIED Exhibit P-1M, Procurement Programs - Modification Summary Page 3 of 5 Volume 1 - xxviii === page 34 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Exhibit P-1M, Procurement Programs - Modification Summary (Listing by Model) Model: CH-47D P-3a Individual Modifications Modification Number Modification Title Applies to Multiple Models AA0723 Comms, Nav Surveillance Yes A01006 Aviation ASSURED PNT Yes Model: CH/MH-47F P-3a Individual Modifications Modification Number Modification Title Applies to Multiple Models AA0723 Comms, Nav Surveillance Yes A01006 Aviation ASSURED PNT Yes Model: LUH P-3a Individual Modifications Modification Number AA0723 Modification Title Comms, Nav Surveillance Applies to Multiple Models Yes Model: UH/HH-60A/L/V P-3a Individual Modifications Modification Number A01006 Modification Title Aviation ASSURED PNT Applies to Multiple Models Yes UNCLASSIFIED Exhibit P-1M, Procurement Programs - Modification Summary Page 4 of 5 Volume 1 - xxix === page 35 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Exhibit P-1M, Procurement Programs - Modification Summary (Listing by Model) Model: FW P-3a Individual Modifications Modification Number A01006 Modification Title Aviation ASSURED PNT Applies to Multiple Models Yes UNCLASSIFIED Exhibit P-1M, Procurement Programs - Modification Summary Page 5 of 5 Volume 1 - xxx === page 36 === UNCLASSIFIED Army • Budget Estimates FY 2027 • Procurement Exhibit P-1M, Procurement Programs - Modification Summary (Funding for Modifications) Funding ($ M) P-3a Modification Title PYS FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 Exhibit P-3a AH-64 APACHE MODS 9,505.674 93.826 131.236 251.645 - 251.645 265.581 265.547 265.548 265.637 CH-47 Cargo Helicopter Mods (MYP) 11,219.436 38.925 17.709 108.408 - 108.408 85.833 86.831 90.853 126.734 UTILITY HELICOPTER MODS 1,857.099 39.565 38.659 120.013 - 120.013 152.950 85.347 114.551 128.451 Network And Mission Plan 1,141.419 49.862 43.472 29.235 - 29.235 35.471 30.657 38.076 55.236 Comms, Nav Surveillance 1,342.909 61.362 11.566 14.384 - 14.384 12.796 13.766 13.652 13.789 Aviation ASSURED PNT 233.048 69.161 49.475 55.055 - 55.055 54.886 53.922 53.597 54.134 25,299.585 352.701 292.117 578.740 0.000 578.740 607.517 536.070 576.277 643.981 Totals (Total Obligation Authority) Total Obligation Authority UNCLASSIFIED Exhibit P-1M, Procurement Programs - Modification Summary Page 1 of 1 Volume 1 - xxxi === page 37 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 9670A00005 / MQ-1 UAV Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 10: Fixed Wing ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0305204A, 0305219A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total 8 8 - - - - - - - - 314 4,211.987 240.000 240.000 - - - - - - - - 4,691.987 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4,211.987 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2026 298 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2025 4,211.987 - - 240.000 240.000 - - 240.000 240.000 4,691.987 4,691.987 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 14,134.185 30,000.000 30,000.000 14,942.634 Description: The MQ-1C Gray Eagle provides the Army with an Extended Range, Multi-Purpose (ERMP) Uncrewed Aircraft System (UAS) in Multi-Domain Operations (MDO); capable of executing reconnaissance, security, attack, and intelligence collection missions in Range of Military Operations (ROMO). Sensors/Payloads include an Electro-Optical/Infrared/Laser Designator (EO/IR/LD), Synthetic Aperture Radar/Moving Target Indicator (SAR/MTI), Signals Intelligence (SIGINT), and HELLFIRE missiles providing long range, deep sense/attack with standoff. The MQ-1C Gray Eagle system consists of Aircraft (Modernized Extended Range), Single/Multi-Band Satellite Communication (SATCOM) Air Data Terminals (SB/MB-SADTs), Ground Expeditionary Equipment (Control Stations), Universal Ground Data Terminals (UGDTs), Single/Multi-Band SATCOM Ground Data Terminals (SB/MB-SGDTs), and Ground Based Sense And Avoid (GBSAA). Payloads include ElectroOptical/Infrared Laser Range Finder/Laser Designator (EO/IR/LD HD), Synthetic Aperture Radar/Ground Moving Target Indicator (SAR/GMTI), and Communication Relay to provide an operational ready capability. 4 May 2017, the Army approved an Army Acquisition Objective (AAO) adjustment to bring the total requirement to 204 MQ-1C Gray Eagle aircraft. Secondary Distribution ANG Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 8 8 - - - - - - - 240.000 240.000 - - - - - - - 8 8 - - - - - - - 240.000 240.000 - - - - - - - Justification: There is no FY 2027 funding programmed for MQ-1 UAV. LI 9670A00005 - MQ-1 UAV Army UNCLASSIFIED Page 1 of 1 P-1 Line #1 Volume 1 - 1 === page 38 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 9672A00510 / Future UAS Family Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 10: Fixed Wing Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - 47 - - - - - - - Continuing Gross/Weapon System Cost ($ in Millions) 13.200 57.902 71.459 - - - - - - - Continuing Less PY Advance Procurement ($ in Millions) - - - - - - - - - - 13.200 57.902 71.459 - - - - - - - Resource Summary Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years To FY 2031 Complete Total Continuing Continuing Continuing Continuing - - - - - - - - - - - - 13.200 57.902 71.459 - - - - - - - Continuing Continuing - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - 1,520.404 Continuing Continuing Description: The FY 2026 spend plan amount for Future UAS Family includes $71,459K of discretionary and $26,000K of mandatory (reconciliation) for a total of $97,459K. Unmanned Aerial Systems (UAS) Family provides enhanced capabilities by fostering innovation and accelerated deployment of promising technology. Funding in this portfolio will be directed towards enhanced warfighting effectiveness and combating limitations from the pace and proliferation of technological change. UASs are critical systems in the cross-domain capabilities concept that will employ multi-domain operation capabilities at all echelons and allow ground-based forces to project power from land into other domains to defeat highly capable enemies, secure terrain, and consolidate gains. UAS encompass an array of capabilities from platoon Soldiers to Division Commanders. The Brigade (BDE) UAS initiative will rapidly deliver critical capabilities to Brigade Combat Teams (BCTs) and the Army Transformation and Training Command (T2COM), addressing identified gaps in RSTA, communications, lethality, and electronic warfare. Leveraging a readily available VTOL platform with MMPs, the BDE UAS provides sustained, multi-role operational capacity in challenging environments. Ultra Long Endurance (ULE) UAS provides an organic solution capable of long endurance aerial tier network extension with deep sensing and effects needed for highly dispersed, Anti-Access/Area Denial environments. ULE-UAS meets COCOM persistent Intelligence, Surveillance, and Reconnaissance coverage and loiter capability, increased communications relay, and Assured Position, Timing, and Navigation, deep sensing and aerial tier network extension critical capability gaps within the Southern border and other requiring COCOMs. Launched Effects (LE) extends the speed, range, lethality and survivability of maneuver formations through the integration of air vehicles, mission systems, payloads, and behaviors. LE will provides Army formations with the ability to expedite and strengthening the kill web, facilitate the penetration and dis-integration the enemy's Anti-Access Area Denial (A2AD) environment and extend the maneuver force's reach, lethality, and survivability. LE efforts are based on requirements from an AROC approved Abbreviated-Capability Development Document (A-CDD) approved 08 July 2024. The UAS Marketplace expands the Defense Industrial Base, expedites capability delivery, and provides warfighters with vetted, flexible solutions to meet mission requirements. The UAS Marketplace operationalizes a streamlined acquisition framework for both Programs of Record (PoR) and emerging capabilities, while also serving as the mechanism to demonstrate, assess and perform verifications on a range of UAS solutions. The UAS Marketplace empowers the warfighter at the tactical edge, providing the flexibility to procure vetted, mission-specific UAS solutions. The PM UAS will leverage this centralized marketplace to execute UAS procurements and deliveries, ensuring soldiers are equipped through a modern, efficient, scalable, and capability-validated marketplace. LI 9672A00510 - Future UAS Family Army UNCLASSIFIED Page 1 of 2 P-1 Line #2 Volume 1 - 2 === page 39 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 9672A00510 / Future UAS Family Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 10: Fixed Wing Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 - 57.902 FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 47 - - - - - - - 71.459 - - - - - - - 47 - - - - - - - 71.459 - - - - - - - 57.902 FY 2027 OOC Justification: PM will inform Congress of any quantity changes between products in the next update. FY 2027 funding realigned to A14000 UAS Family. In accordance with section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110 - 181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities LI 9672A00510 - Future UAS Family Army UNCLASSIFIED Page 2 of 2 P-1 Line #2 Volume 1 - 3 === page 40 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 9678A12500 / SMALL UNMANNED AIRCRAFT SYSTEMS Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 10: Fixed Wing Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 868 391 1,717 590 - 590 498 433 641 635 Continuing Gross/Weapon System Cost ($ in Millions) 83.061 190.914 426.029 291.472 - 291.472 281.576 284.994 281.158 288.317 Continuing Less PY Advance Procurement ($ in Millions) - Resource Summary Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 83.061 83.061 190.914 190.914 426.029 426.029 291.472 291.472 - 291.472 291.472 281.576 281.576 284.994 284.994 281.158 281.158 To FY 2031 Complete 288.317 Continuing - Continuing 288.317 Total Continuing Continuing - - Continuing Continuing - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 95.692 488.271 248.124 494.020 - 494.020 565.414 658.185 438.624 454.043 Continuing Continuing Description: The FY 2026 spend plan amount for SMALL UNMANNED AIRCRAFT SYSTEMS includes $426,029K of discretionary and $300,000K of mandatory (reconciliation) for a total of $726,029K. The Family of Small Uncrewed Aircraft systems are critical to the Army's Transformation in Contact. The Joint Small Uncrewed Aircraft System sUAS Capability Development Document (J-sUAS CDD) solves current and emergent operational gaps by incorporating Modular Open Systems Approach (MOSA) including swappable payloads, advanced autonomy and software scalability. These systems provide battalion and below ground maneuver elements with critical situational awareness and enhanced force protection as well as responsive reconnaissance and targeting capability with real-time Full Motion Video and sensor data. Each system will include aircraft, ground support equipment, ground control station and Uncrewed Vehicle Control (UVC) software. The Short Range Reconnaissance (SRR) provides organic maneuver platoons an uncrewed air vehicle designed to support Reconnaissance, Surveillance, and Target Acquisition (RSTA). The system has an aircraft weight of less than 5 lbs, a range of 3-5 km, and an endurance greater than 30 minutes. The system includes modular payloads, obstacle avoidance, target recognition, automated following, and networked capability. The Medium Range Reconnaissance (MRR) system, informed by the Company Level Directed Requirement (SUAS DR), provides organic RSTA capability within the Maneuver Company of Brigade Combat Teams. The systems will have 10km range and 8-hour endurance. System will include Assured Positioning, Navigation and Timing (APNT), Electro-Optical/Infra-Red (EO/IR), laser targeting, and kinetic architectures in a contested environment. The Long Range Reconnaissance (LRR) System provides organic maneuver battalions an uncrewed air vehicle designed to support RSTA efforts. The systems have an aircraft weight of less than 55 lbs., a range of 40-60 km and endurance of 5-10 hours. System includes APNT, EO/IR, laser targeting, and kinetic architectures in a contested environment. The Joint Tactical Autonomous Aerial Resupply System (JTAARS) is an autonomous aerial cargo delivery system, organic to the maneuver commander, that provides options for rapid and agile sustainment of highly mobile tactical combat forces, operating in a widely dispersed manner in the tactical support and close areas. JTAARS enables maneuver by reducing the tactical force's dependence on ground lines of communication and sustainment, reducing threats to manned convoys and manned aerial systems, lightening Soldier load, and shrinking the supply chain. JTAARS provides a lift capability of 125 lbs over 13 km one way (26 km round trip). LI 9678A12500 - SMALL UNMANNED AIRCRAFT SYSTEMS Army UNCLASSIFIED Page 1 of 8 P-1 Line #3 Volume 1 - 4 === page 41 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 9678A12500 / SMALL UNMANNED AIRCRAFT SYSTEMS Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 10: Fixed Wing Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Purpose Built Attritable System (PBAS) provides organic maneuver platoons an uncrewed air vehicle designed to support the ability to achieve lethal effects. PBAS shall have a range of at least 2 km and 15 minutes of endurance. The PBAS system consists of First Person Viewer (FPV) goggles, controller, leader display, up to two 10" air vehicles and four 5" air vehicles with modular payload(s) to include ability to integrate and employ a variety of lethal/non-lethal armaments and munitions. Expands the Defense Industrial Base, expedites capability delivery, and provides warfighters with vetted, flexible solutions to meet mission requirements. The UAS Marketplace will be used as the means for units to procure these systems utilizing program funding. The UAS Marketplaces operationalizes a streamlined acquisition framework for both Programs of Record (PoR) and emerging capabilities, while also serving as the mechanism to demonstrate, assess and perform verifications on a range of UAS solutions. The UAS Marketplace empowers the warfighter at the tactical edge, providing the flexibility to procure vetted, mission-specific UAS solutions. The PM UAS will leverage this centralized marketplace to execute UAS procurements and deliveries, ensuring soldiers are equipped through a modern, efficient, scalable, and capability-validated marketplace. AMC Advanced Manufacturing Initiative for UAS (Sky Foundry) is an Army Material Command (AMC) initiative to create a scalable production ecosystem for rapidly equipping U.S. forces with low-cost small Uncrewed Aircraft System (sUAS) capabilities. The initiative is divided into two main objectives. AMC is leading the implementation of the first objective where various Army depots and arsenals will perform specific roles based on their core capabilities ranging from sUAS component production and final assembly to innovation. The Assistant Secretary of the Army (Acquisition, Logistics, and Technology) (ASA(ALT)) is leading the second objective creating a comprehensive, vertically integrated sUAS production ecosystem which is complimentary to the first objective. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 391 1,717 590 - 590 498 433 641 635 190.914 426.029 291.472 - 291.472 281.576 284.994 281.158 288.317 391 1,717 590 - 590 498 433 641 635 190.914 426.029 291.472 - 291.472 281.576 284.994 281.158 288.317 LI 9678A12500 - SMALL UNMANNED AIRCRAFT SYSTEMS Army UNCLASSIFIED Page 2 of 8 P-1 Line #3 Volume 1 - 5 === page 42 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 9678A12500 / SMALL UNMANNED AIRCRAFT SYSTEMS Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 10: Fixed Wing ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 868 / 83.061 391 / 190.914 1,573 / 217.790 482 / 48.083 - / - 482 / 48.083 144 / 208.239 108 / 92.403 - / - 108 / 92.403 - / 150.986 - / - - 590 / 291.472 - / - 590 / 291.472 P-5 A12511 / SHORT RANGE RECONNAISSANCE P-5 A12513 / LONG RANGE RECONNAISSANCE - / - - / - P-5 A12514 / SKY FOUNDRY - / - - / - P-40 Total Gross/Weapon System Cost 868 / 83.061 391 / 190.914 - / - 1,717 / 426.029 / 150.986 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 procurement dollars support UAS Marketplace, Short Range Reconnaissance (SRR), Company Level SUAS Directed Requirement (Co Lvl SUAS DR), Medium Range Reconnaissance (MRR), Long Range Reconnaissance (LRR), Joint Tactical Autonomous Aerial Resupply System (JTAARS) and Purpose Built Attritable System (PBAS). This funding also includes AMC Advanced Manufacturing Initiative for UAS (Sky Foundry). AMC Advanced Manufacturing Initiative for UAS (Sky Foundry) will be used to scale drone production within the U.S. through establishing improvements to mitigate production deficiencies in both Organic and Commercial Industrial bases. Battalion and below systems will be procured based on Soldier demand, with base procurement quantity of 590 systems. PM will inform Congress of any quantity changes between products in the next update. Battalion and below includes SRR, PBAS, MRR, LRR, and JTAARS. Unit costs range from $0.044M to $2.250M per system. In accordance with section 1815 of the FY08 National Defense Authorization Act (P.L.110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses and providing military support to civil authorities. LI 9678A12500 - SMALL UNMANNED AIRCRAFT SYSTEMS Army UNCLASSIFIED Page 3 of 8 P-1 Line #3 Volume 1 - 6 === page 43 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 9678A12500 / SMALL UNMANNED AIRCRAFT SYSTEMS Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: A12511 / SHORT RANGE RECONNAISSANCE MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) FY 2025 FY 2026 482 - 482 83.061 190.914 217.790 48.083 - 48.083 - - 190.914 - Total Obligation Authority ($ in Millions) FY 2027 Total 1,573 83.061 Plus CY Advance Procurement ($ in Millions) FY 2027 OOC 391 - Net Procurement (P-1) ($ in Millions) FY 2027 Base 868 217.790 - 83.061 - - - 48.083 - 48.083 - 190.914 217.790 - - - 48.083 - 48.083 - - - 99.757 - 99.757 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 95.692 - 488.271 138.455 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost SUAS Fielding/ Initial Spares & Reparables - - 4.108 - - 9.487 - - 13.172 - - 1.898 - - - - - 1.898 SUAS New Equipment Training - - 6.700 - - 2.976 - - 5.062 - - 1.392 - - - - - 1.392 SUAS SEPM - - 3.666 - - 1.942 - - 13.337 - - 2.167 - - - - - 2.167 SUAS Development and Qualification - - - - - - - - 2.581 - - 2.634 - - - - - 2.634 PBAS SEPM - - - - - - - - 1.404 - - 1.395 - - - - - 1.395 PBAS Fielding/Spares - - - - - - - - 1.527 - - 0.724 - - - - - 0.724 PBAS NET/NEF - - - - - - - - 1.411 - - 2.873 - - - - - 2.873 Subtotal: Recurring Cost - - 14.474 - - 14.405 - - 38.494 - - 13.083 - - - - - 13.083 - - 14.474 - - 14.405 - - 38.494 - - 13.083 - - - - - 13.083 Short Range Reconnaissance (SRR) Systems - - 37.942 - - 17.550 65.014 1,078 70.085 64.804 56 3.629 - - - 64.804 56 3.629 Directed Requirement Uncrewed Aircraft Systems - - 16.945 - - 11.559 615.116 138 84.886 - - - - - - - - - Subtotal: Flyaway Cost Hardware Cost Recurring Cost LI 9678A12500 - SMALL UNMANNED AIRCRAFT SYSTEMS Army UNCLASSIFIED Page 4 of 8 P-1 Line #3 Volume 1 - 7 === page 44 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 9678A12500 / SMALL UNMANNED AIRCRAFT SYSTEMS Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: A12511 / SHORT RANGE RECONNAISSANCE MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) Medium Range Reconnaissance Systems - - FPV/PBAS Systems - Subtotal: Recurring Cost - 3-D Printers (Congressional Add) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) - - - - - - - 54.887 - - - 1.200 SUAS Replenishment Funding - - PBAS Replenishment Funding - Subtotal: Non Recurring Cost ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) - - - - - 68.137 - 29.109 - - - - - - - - - - - 12.500 - - ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - 557.211 19 10.587 - - - 557.211 19 10.587 357 24.325 51.066 407 20.784 - - - 51.066 407 20.784 - 179.296 - - 35.000 - - - - - 35.000 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Non Recurring Cost 147.400 - - - 13.700 - - 147.400 - - - - - - - - - - - Subtotal: Hardware Cost - - 68.587 - - 176.509 - - 179.296 - - 35.000 - - - - - 35.000 Gross/Weapon System Cost 95.692 868 83.061 391 190.914 1,573 217.790 99.757 482 48.083 - - - 99.757 482 48.083 488.271 138.455 Remarks: Battalion and below systems will be procured based on Soldier demand, with base procurement quantity of 482 systems. PM will inform Congress of any quantity changes between products in the next update. Battalion and below includes SRR, PBAS, and MRR. Unit costs range from $0.044M to $0.455M per system. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 9678A12500 - SMALL UNMANNED AIRCRAFT SYSTEMS Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total 391 1,573 482 - 482 190.914 217.790 48.083 - 48.083 391 1,573 482 - 482 190.914 217.790 48.083 - 48.083 UNCLASSIFIED Page 5 of 8 P-1 Line #3 Volume 1 - 8 === page 45 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 9678A12500 / SMALL UNMANNED AIRCRAFT SYSTEMS Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: A12513 / LONG RANGE RECONNAISSANCE MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) - - 144 108 - 108 Gross/Weapon System Cost ($ in Millions) - - 208.239 92.403 - 92.403 Less PY Advance Procurement ($ in Millions) - - Net Procurement (P-1) ($ in Millions) - - Plus CY Advance Procurement ($ in Millions) - - Total Obligation Authority ($ in Millions) - - 208.239 - - - 92.403 - 92.403 208.239 - - - 92.403 - 92.403 - - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - Gross/Weapon System Unit Cost ($ in Thousands) - - 1,446.104 855.583 - - 855.583 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost LRR/JTAARS Fielding - - - - - - - - 23.947 - - 10.511 - - - - - 10.511 LRR/JTAARS NET/ NEF - - - - - - - - 3.957 - - 1.737 - - - - - 1.737 LRR/JTAARS Systems Engineering and Program Management - - - - - - - - 16.659 - - 7.312 - - - - - 7.312 Subtotal: Recurring Cost - - - - - - - - 44.563 - - 19.560 - - - - - 19.560 - - - - - - - - 44.563 - - 19.560 - - - - - 19.560 Long Range Reconnaissance Production - - - - - - 1,329.549 102 135.614 1,327.643 28 37.174 - - - 1,327.643 28 37.174 JTAARS Production - - - - - - 618.571 42 25.980 434.438 80 34.755 - - - 434.438 80 34.755 Subtotal: Recurring Cost - - - - - - - - 161.594 - - 71.929 - - - - - 71.929 - - - - - - - - 161.594 - - 71.929 - - - - - 71.929 - - - - - - - - 2.082 - - 0.914 - - - - - 0.914 Subtotal: Flyaway Cost Hardware Cost Recurring Cost Subtotal: Hardware Cost Software Cost Recurring Cost LRR/JTAARS Software Maintenance LI 9678A12500 - SMALL UNMANNED AIRCRAFT SYSTEMS Army UNCLASSIFIED Page 6 of 8 P-1 Line #3 Volume 1 - 9 === page 46 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 9678A12500 / SMALL UNMANNED AIRCRAFT SYSTEMS Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: A12513 / LONG RANGE RECONNAISSANCE MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Subtotal: Recurring Cost Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - - - - - - - 2.082 - - 0.914 - - - - - Subtotal: Software Cost - - - - - - - - 2.082 - - 0.914 - - - - - 0.914 Gross/Weapon System Cost - - - - - - 144 208.239 108 92.403 - - - 108 92.403 1,446.104 855.583 855.583 0.914 Remarks: Battalion and below systems will be procured based on Soldier demand, with base procurement quantity of 108 systems. PM will inform Congress of any quantity changes between products in the next update. Battalion and below includes LRR and JTAARS. Unit costs range from $0.474M to $2.250M per system. Secondary Distribution Army Total: Secondary Distribution FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total Quantity - 144 108 - 108 Total Obligation Authority - 208.239 92.403 - 92.403 Quantity - 144 108 - 108 Total Obligation Authority - 208.239 92.403 - 92.403 LI 9678A12500 - SMALL UNMANNED AIRCRAFT SYSTEMS Army UNCLASSIFIED Page 7 of 8 P-1 Line #3 Volume 1 - 10 === page 47 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 9678A12500 / SMALL UNMANNED AIRCRAFT SYSTEMS Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: A12514 / SKY FOUNDRY MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 Procurement Quantity (Units in Each) - - - Gross/Weapon System Cost ($ in Millions) - - - Less PY Advance Procurement ($ in Millions) - - - Net Procurement (P-1) ($ in Millions) - - - Plus CY Advance Procurement ($ in Millions) - - - Total Obligation Authority ($ in Millions) - - - FY 2027 Base FY 2027 OOC - - 150.986 FY 2027 Total - - - 150.986 - 150.986 - - - 150.986 - 150.986 - - 150.986 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost Sky Foundry - - - - - - - - - - - 150.986 - - - - - 150.986 - - - - - - - - - - - 150.986 - - - - - 150.986 Subtotal: Flyaway Cost - - - - - - - - - - - 150.986 - - - - - 150.986 Gross/Weapon System Cost - - - - - - - - - - - 150.986 - - - - - 150.986 Subtotal: Recurring Cost Secondary Distribution Army Total: Secondary Distribution FY 2025 FY 2027 Base FY 2026 Quantity - - Total Obligation Authority - - Quantity - - Total Obligation Authority - - LI 9678A12500 - SMALL UNMANNED AIRCRAFT SYSTEMS Army UNCLASSIFIED Page 8 of 8 FY 2027 OOC 150.986 150.986 P-1 Line #3 FY 2027 Total - 150.986 150.986 Volume 1 - 11 === page 48 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 9681A14000 / UNMANNED AIRCRAFT SYSTEMS (UAS) Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 10: Fixed Wing Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - 8 - 8 145 97 114 114 - 478 Gross/Weapon System Cost ($ in Millions) - - - 52.398 - 52.398 280.130 265.464 269.450 279.154 - 1,146.596 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - - 52.398 - 52.398 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - - 52.398 - 52.398 280.130 280.130 265.464 265.464 269.450 269.450 279.154 279.154 - 1,146.596 - 1,146.596 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - 6,549.750 - 6,549.750 1,931.931 2,736.742 2,363.596 2,448.719 - 2,398.736 Description: Funding in FY 2027 was realigned from A00510 Future UAS Family to A14000 Unmanned Aircraft Systems (UAS). A14011 Launched Effects is not a new start. Funding was realigned from A00511 Air Launched Effects to A14011 Launched Effects. Unmanned Aircraft Systems (UAS) Family provides enhanced capabilities by fostering innovation and accelerated deployment of promising technology. Funding in this portfolio will be directed towards enhanced warfighting effectiveness and combating limitations from the pace and proliferation of technological change. UASs are critical systems in the cross-domain capabilities concept that will employ multi-domain operation capabilities at all echelons and allow ground-based forces to project power from land into other domains to defeat highly capable enemies, secure terrain, and consolidate gains. UAS encompass an array of capabilities from platoon Soldiers to Division Commanders. Launched Effects (LE) extends the speed, range, lethality and survivability of maneuver formations through the integration of air vehicles, mission systems, payloads, and behaviors. LE will provides Army formations with the ability to expedite and strengthening the kill web, facilitate the penetration and dis-integration the enemy's Anti-Access Area Denial (A2AD) environment and extend the maneuver force's reach, lethality, and survivability. The Brigade (BDE) UAS initiative will rapidly deliver critical capabilities to Brigade Combat Teams (BCTs) and the Army Transformation and Training Command (T2COM), addressing identified gaps in RSTA, communications, lethality, and electronic warfare. Leveraging a readily available VTOL platform with MMPs, the BDE UAS provides sustained, multi-role operational capacity in challenging environments. Group 4+ UAS S/VTOL provides a short/vertical takeoff and landing, expeditionary, extended range reconnaissance, surveillance, target acquisition (RSTA) with multiple sensors, communications, lethality and electromagnetic warfare capability. UAS supports Human Machine Integrated Formations (HMIF) and provides the opportunity to learn, fail, refine requirements, and develop solutions faster than our adversaries. UAS incorporates soldier feedback from materiel solution(s) to enhance survivability in an MDO environment through modular payloads to facilitate upgraded communication, encryption, and lethality at the pace of technology. UAS provides enhanced transportability, rapid deployability, expeditionary maneuver, and mobility for adaptive and agile operations. One system consists of multiple air vehicles with Modular Mission Payloads (MMPs), ground control stations, and ancillary equipment. The aircraft subsystem includes the airframe, propulsion system, avionics, communications, navigation, and software systems. Aircraft-specific ground support equipment includes power generation, transportation, command and control equipment, aircraft software and MMPs. LI 9681A14000 - UNMANNED AIRCRAFT SYSTEMS (UAS) Army UNCLASSIFIED Page 1 of 5 P-1 Line #4 Volume 1 - 12 === page 49 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 9681A14000 / UNMANNED AIRCRAFT SYSTEMS (UAS) Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 10: Fixed Wing Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A The UAS Marketplace expands the Defense Industrial Base, expedites capability delivery, and provides warfighters with vetted, flexible solutions to meet mission requirements. The UAS Marketplace operationalizes a streamlined acquisition framework for both Programs of Record (PoR) and emerging capabilities, while also serving as the mechanism to demonstrate, assess and perform verifications on a range of UAS solutions. The UAS Marketplace empowers the warfighter at the tactical edge, providing the flexibility to procure vetted, mission-specific UAS solutions. The PM UAS will leverage this centralized marketplace to execute UAS procurements and deliveries, ensuring soldiers are equipped through a modern, efficient, scalable, and capability-validated marketplace. Secondary Distribution Army Total: Secondary Distribution FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 Quantity - - 8 - 8 145 97 114 114 Total Obligation Authority - - 52.398 - 52.398 280.130 265.464 269.450 279.154 Quantity - - 8 - 8 145 97 114 114 Total Obligation Authority - - 52.398 - 52.398 280.130 265.464 269.450 279.154 LI 9681A14000 - UNMANNED AIRCRAFT SYSTEMS (UAS) Army UNCLASSIFIED Page 2 of 5 P-1 Line #4 Volume 1 - 13 === page 50 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 9681A14000 / UNMANNED AIRCRAFT SYSTEMS (UAS) Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 10: Fixed Wing ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 A14011 / LAUNCHED EFFECTS - / - - / - - / - 8 / 5.478 - / - 8 / 5.478 P-5 A14012 / ECHELONS ABOVE BRIGADE (EAB) UAS - / - - / - - / - - / 46.920 - / - - P-40 Total Gross/Weapon System Cost - / - - / - - / - 8 / 52.398 - / - 8 / 52.398 / 46.920 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Funding in FY 2027 was realigned from A00510 Future UAS Family to A14000 Unmanned Aircraft Systems (UAS). FY 2027 procurement dollars will support recurring production and fielding of all Launched Effects variants to Army divisions and will also support force protection for UAS. The UAS Marketplace expands the Defense Industrial Base, expedites capability delivery, and provides warfighters with vetted, flexible solutions to meet mission requirements. The UAS Marketplace operationalizes a streamlined acquisition framework for both Programs of Record (PoR) and emerging capabilities, while also serving as the mechanism to demonstrate, assess and perform verifications on a range of UAS solutions. The UAS Marketplace empowers the warfighter at the tactical edge, providing the flexibility to procure vetted, mission-specific UAS solutions. The PM UAS will leverage this centralized marketplace to execute UAS procurements and deliveries, ensuring soldiers are equipped through a modern, efficient, scalable, and capability-validated marketplace. LI 9681A14000 - UNMANNED AIRCRAFT SYSTEMS (UAS) Army UNCLASSIFIED Page 3 of 5 P-1 Line #4 Volume 1 - 14 === page 51 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 9681A14000 / UNMANNED AIRCRAFT SYSTEMS (UAS) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: A14011 / LAUNCHED EFFECTS MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) - - - 8 - 8 Gross/Weapon System Cost ($ in Millions) - - - 5.478 - 5.478 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - - 5.478 - 5.478 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - - 5.478 - 5.478 - - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - 684.750 - - 684.750 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost Qty ($ K) FY 2027 Total Total Cost (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost System Integration/ Manufacturing - - - - - - - - - - - 4.875 - - - - - 4.875 Subtotal: Recurring Cost - - - - - - - - - - - 4.875 - - - - - 4.875 System Engineering and Program Management - - - - - - - - - - - 0.603 - - - - - 0.603 Subtotal: Non Recurring Cost - - - - - - - - - - - 0.603 - - - - - 0.603 Subtotal: Flyaway Cost - - - - - - - - - - - 5.478 - - - - - Gross/Weapon System Cost - - - - - - - - - 5.478 - - - Non Recurring Cost Secondary Distribution Army Total: Secondary Distribution FY 2025 684.750 8 FY 2027 Base FY 2026 684.750 FY 2027 OOC 5.478 8 5.478 FY 2027 Total Quantity - - 8 - 8 Total Obligation Authority - - 5.478 - 5.478 Quantity - - 8 - 8 Total Obligation Authority - - 5.478 - 5.478 LI 9681A14000 - UNMANNED AIRCRAFT SYSTEMS (UAS) Army UNCLASSIFIED Page 4 of 5 P-1 Line #4 Volume 1 - 15 === page 52 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 9681A14000 / UNMANNED AIRCRAFT SYSTEMS (UAS) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: A14012 / ECHELONS ABOVE BRIGADE (EAB) UAS MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - - 46.920 - 46.920 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - - 46.920 - 46.920 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - - 46.920 - 46.920 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Hardware Cost Non Recurring Cost Long Lead Government Furnished Equipment - - - - - - - - - - - 46.920 - - - - - 46.920 Subtotal: Non Recurring Cost - - - - - - - - - - - 46.920 - - - - - 46.920 Subtotal: Hardware Cost - - - - - - - - - - - 46.920 - - - - - 46.920 Gross/Weapon System Cost - - - - - - - - - - - 46.920 - - - - - 46.920 Secondary Distribution Army Total: Secondary Distribution FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total Quantity - - - - - Total Obligation Authority - - 46.920 - 46.920 Quantity - - - - - Total Obligation Authority - - 46.920 - 46.920 LI 9681A14000 - UNMANNED AIRCRAFT SYSTEMS (UAS) Army UNCLASSIFIED Page 5 of 5 P-1 Line #4 Volume 1 - 16 === page 53 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 9697A12400 / HADES PLATFORM, PAYLOADS/PED, AND INTEGRATION Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 10: Fixed Wing Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total 193 - 193 1 1 1 1 Continuing 227.569 - 227.569 310.036 363.256 465.327 469.818 Continuing Procurement Quantity (Units in Each) - - - Gross/Weapon System Cost ($ in Millions) - - 26.850 Less PY Advance Procurement ($ in Millions) - - - Net Procurement (P-1) ($ in Millions) - - 26.850 Plus CY Advance Procurement ($ in Millions) - - - Total Obligation Authority ($ in Millions) - - 26.850 - - 227.569 - - - 227.569 - 227.569 - - 227.569 FY 2028 FY 2029 310.036 310.036 To FY 2031 Complete FY 2030 363.256 363.256 465.327 465.327 469.818 Continuing - Continuing 469.818 Total Continuing Continuing - - Continuing Continuing - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - 1,179.114 - 1,179.114 310,036.000 363,256.000 465,327.000 469,818.000 Continuing Continuing Description: High Accuracy Detection and Exploitation System (HADES) is the Army's first priority in the Multi-Domain Sensing System (MDSS) portfolio of systems and is the centerpiece of the Army's Aerial Intelligence, Surveillance, and Reconnaissance (A-ISR) transformation strategy. HADES is a commercial jet modified for military use with complex Outer Mold Line (OML) aerodynamic modifications and integrated with sensors which provide Communications Intelligence (COMINT), Electronics Intelligence (ELINT), and Synthetic Aperture Radar/Moving Target Indicator (SAR/MTI) (i.e. RADAR) capabilities, Aircraft Survivability Equipment (ASE), and other military mission equipment utilizing open system standards. HADES allows the Army to fly higher, faster, and farther, which directly impacts the warfighter's ability to see and sense deeper, delivering an organic capability in line with the Army's operational imperative for deep sensing. HADES provides advanced aerial intelligence sensing capabilities for Multi-Domain Operations (MDO) against peer and near-peer adversaries, addressing the Army's deep sensing needs in all phases of operations and throughout the depth of the future battlefield. With higher airspeed, range and endurance, HADES will facilitate A-ISR coverage for a much larger geographical area than current capability and will facilitate global deployment within days instead of the current transitional period of several weeks for legacy aircraft. This will adversely affect our adversaries' ability to plan and maneuver. This is also aligned with the Headquarters Department of the Army Deputy Chief of Staff (HQDA DCS) G2 strategy that lethality begins with intelligence. HADES provides highly mobile, long endurance converged deep sensing through the collection of COMINT, ELINT, and SAR/MTI data. Subsequent increment upgrades can host Electronic Warfare (EW), Radio Frequency (RF)-enabled Cyber, and Launched Effects (LE) as well as additional system improvements. Aircraft performance and a Modular Open Systems Approach (MOSA) increases flexibility in rapid global deployment and postures to meet emerging operational needs. AAO: N/A Quantity is defined as the purchase of a Global 6500 aircraft. Project office is utilizing the Middle Tier Acquisition (MTA) authority for Rapid Prototyping including Special User Demonstration (SUD) throughout the process to help refine the requirements. The Army Acquisition Executive (AAE) approved a transition plan from Rapid Prototyping to Rapid Fielding on 02 April 2025. HADES requirements are identified in the HADES Abbreviated Capability Description Document (A-CDD) approved by the Army Requirements Oversight Council (AROC) on 26 August 2020 and signed by the Commanding General, Army Futures Command (AFC) on 18 September 2020. Micro High-Altitude Balloons (MHABs) and Payloads provide designated formations with semi-reusable, often attritable high-altitude capabilities. MHABs are low-cost, high-altitude, low observable platforms quickly launched by tactical units providing situational awareness, and communications extension. Tactical MHABs can launch in adverse weather conditions at the tactical edge (higher winds & frozen precipitation). MHAB Tactical Operations require minimal manpower and materiel support. MHABs include multi-function sensor capabilities (e.g. COMINT, ELINT, SAR/MTI, Electro-Optical / Infrared (EO/IR) and glide vehicles (Launched Effects)) with additional sensor capabilities to be incorporated in the future. This funding line addresses the gap in large scale combat operations regarding deep sensing in support of Long-Range Precision Fires. LI 9697A12400 - HADES PLATFORM, PAYLOADS/PED, AND INTEGR... Army UNCLASSIFIED Page 1 of 11 P-1 Line #5 Volume 1 - 17 === page 54 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 9697A12400 / HADES PLATFORM, PAYLOADS/PED, AND INTEGRATION Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 10: Fixed Wing Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Secondary Distribution Army Total: Secondary Distribution FY 2025 FY 2027 Base FY 2026 Quantity - - Total Obligation Authority - 26.850 Quantity - - Total Obligation Authority - 26.850 LI 9697A12400 - HADES PLATFORM, PAYLOADS/PED, AND INTEGR... Army FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 193 - 193 1 1 1 1 227.569 - 227.569 310.036 363.256 465.327 469.818 193 - 193 1 1 1 1 227.569 - 227.569 310.036 363.256 465.327 469.818 UNCLASSIFIED Page 2 of 11 P-1 Line #5 Volume 1 - 18 === page 55 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 9697A12400 / HADES PLATFORM, PAYLOADS/PED, AND INTEGRATION Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 10: Fixed Wing Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD P-5a, P-21 MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 A12411 / HADES PLATFORM AND INTEGRATION - / - - / - P-5 A12412 / HADES PAYLOADS AND PED - / - - / - P-40a A12413 / MHABS AND PAYLOADS - / - - / - P-40 Total Gross/Weapon System Cost - / - - / - - / - 1 / 131.657 - / - / 26.850 - / 80.587 - / - 1 / 131.657 - / - 192 / 15.325 - / - 192 / 15.325 / 26.850 193 / 227.569 - / - 193 / 227.569 / 80.587 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Item numbers A12411: HADES Platform and Integration and A12413: MHABS and Payloads are new starts in FY 2027. FY 2027 procurement dollars in the amount of $227.569 million fund the procurement of HADES aircraft, sensors, and integration support; and the MHAB program as outlined below: A12411 / HADES PLATFORM AND INTEGRATION - $131.657 million Procures one Global 6500 aircraft, long lead avionic components, Aircraft Survivability Equipment (ASE), Aircraft Ground Support Equipment (AGSE) and integrates avionic and sensor components into one (1) aircraft. Provides associated program management support for Project Manager Fixed Wing to include acquisition, logistics, testing and airworthiness for HADES #1. A12412 / HADES PAYLOADS AND PED - $80.587 million Supports procurement of long-lead sensor suites, support, spares for HADES #1 and #2. Provides associated program management support for Project Director Sensors Aerial Intelligence to include acquisition, logistics, engineering and test for HADES #1. A12413 / MHABS and PAYLOADS - $15.325 million See classified quad chart for more information. FY 2026 to FY 2027 funding increase is due to the initiation of procurement of Rapid Fielding assets with the first unit in FY 2027. LI 9697A12400 - HADES PLATFORM, PAYLOADS/PED, AND INTEGR... Army UNCLASSIFIED Page 3 of 11 P-1 Line #5 Volume 1 - 19 === page 56 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 9697A12400 / HADES PLATFORM, PAYLOADS/PED, AND INTEGRATION Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: A12411 / HADES PLATFORM AND INTEGRATION MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) - - - 1 - 1 Gross/Weapon System Cost ($ in Millions) - - - 131.657 - 131.657 Less PY Advance Procurement ($ in Millions) - - - Net Procurement (P-1) ($ in Millions) - - - Plus CY Advance Procurement ($ in Millions) - - - Total Obligation Authority ($ in Millions) - - - - - 131.657 - - - 131.657 - 131.657 - - 131.657 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - 131,657.000 - - 131,657.000 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Platform (Aircraft) Procurement and Integration (†) Subtotal: Recurring Cost Subtotal: Hardware Cost - - - - - - - - - 125,688.000 - - - - - - - - - - - - - - - - - - - - 1 125.688 - - - 125,688.000 1 125.688 - 125.688 - - - - - 125.688 - 125.688 - - - - - 125.688 Support - Program Management Cost Government Management - - - - - - - - - - - 5.969 - - - - - 5.969 Subtotal: Support - Program Management Cost - - - - - - - - - - - 5.969 - - - - - 5.969 Gross/Weapon System Cost - - - - - - - - - 131.657 - - - 131,657.000 1 131,657.000 1 131.657 Remarks: Justification: A12411 / HADES PLATFORM AND INTEGRATION - $131.657 million in FY2027 A12411: HADES Platform and Integration is a new start in FY 2027. LI 9697A12400 - HADES PLATFORM, PAYLOADS/PED, AND INTEGR... Army UNCLASSIFIED Page 4 of 11 P-1 Line #5 Volume 1 - 20 === page 57 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 10 P-1 Line Item Number / Title: 9697A12400 / HADES PLATFORM, PAYLOADS/PED, AND INTEGRATION ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: A12411 / HADES PLATFORM AND INTEGRATION MDAP/MAIS Code: Procures one Global 6500 aircraft, long lead avionic components, Aircraft Survivability Equipment (ASE), Aircraft Ground Support Equipment (AGSE) and associated program management support for Project Manager Fixed Wing (PM FW) to include acquisition, logistics, testing and airworthiness for HADES #1. Secondary Distribution Army Total: Secondary Distribution (†) FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total Quantity - - 1 - 1 Total Obligation Authority - - 131.657 - 131.657 Quantity - - 1 - 1 Total Obligation Authority - - 131.657 - 131.657 indicates the presence of a P-5a LI 9697A12400 - HADES PLATFORM, PAYLOADS/PED, AND INTEGR... Army UNCLASSIFIED Page 5 of 11 P-1 Line #5 Volume 1 - 21 === page 58 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 10 Cost Elements Platform (Aircraft) Procurement and Integration (†) Platform (Aircraft) Procurement and Integration (†) O O C P-1 Line Item Number / Title: 9697A12400 / HADES PLATFORM, PAYLOADS/PED, AND INTEGRATION Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: A12411 / HADES PLATFORM AND INTEGRATION FY Contractor and Location Method/Type or Funding Vehicle 2027 Bombardier Learjet, Inc / Wichita, KS SS / IDIQ ACC-Redstone Arsenal Nov 2026 Nov 2027 1 79,066.114 N Sep 2026 2027 SNC, LLC / Hagerstown, MD C / FFP ACC-Redstone Arsenal Aug 2027 Jan 2029 0 46,621.886 N Jun 2027 Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($ K) RFP Issue Date indicates the presence of a P-21 Remarks: The HADES IDIQ contract is sole source, because Bombardier Learjet, Inc. is the only manufacturer of the Global 6500 aircraft. Cost of platform includes the procurement of the base Global 6500 aircraft ($62.465 million) and Supplemental Type Certification (STC) modifications to the platform ($16.601 million) in FY 2027. The quantity of zero displayed for the SNC line item is accurate, as this contract covers the integration of Global 6500 aircraft originally procured from Bombardier Learjet, Inc. into one HADES system. LI 9697A12400 - HADES PLATFORM, PAYLOADS/PED, AND INTEGR... Army UNCLASSIFIED Page 6 of 11 P-1 Line #5 Volume 1 - 22 === page 59 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 9697A12400 / HADES PLATFORM, PAYLOADS/PED, AND INTEGRATION Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Item Number / Title [DODIC]: A12411 / HADES PLATFORM AND INTEGRATION Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Platform (Aircraft) Procurement and Integration 1 2027 ARMY 1 0 1 A O C T N O V D E C J A N F E B LI 9697A12400 - HADES PLATFORM, PAYLOADS/PED, AND INTEGR... Army M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 11 S E P O C T 1 N O V 0 P-1 Line #5 Volume 1 - 23 === page 60 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 9697A12400 / HADES PLATFORM, PAYLOADS/PED, AND INTEGRATION Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 10 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: A12411 / HADES PLATFORM AND INTEGRATION Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Bombardier Learjet, Inc Wichita, KS MSR For 2027 1-8-5 For 2027 MAX For 2027 1 1 3 ALT Prior to Oct 1 ALT After Oct 1 1 Reorder Manufacturing PLT 1 12 Total After Oct 1 ALT Prior to Oct 1 13 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 9697A12400 - HADES PLATFORM, PAYLOADS/PED, AND INTEGR... Army UNCLASSIFIED Page 8 of 11 P-1 Line #5 Volume 1 - 24 0 === page 61 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 9697A12400 / HADES PLATFORM, PAYLOADS/PED, AND INTEGRATION Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: A12412 / HADES PAYLOADS AND PED MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - 26.850 80.587 - 80.587 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - 26.850 80.587 - 80.587 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - 26.850 80.587 - 80.587 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost Sensor Payload Procurement and Support - - - - - - - - 24.165 - - 75.209 - - - - - 75.209 Subtotal: Recurring Cost - - - - - - - - 24.165 - - 75.209 - - - - - 75.209 - - - - - - - - 24.165 - - 75.209 - - - - - 75.209 - - - - - - - - 2.685 - - 5.378 - - - - - 5.378 Subtotal: Support - Program Management Cost - - - - - - - - 2.685 - - 5.378 - - - - - 5.378 Gross/Weapon System Cost - - - - - - - - 26.850 - - 80.587 - - - - - 80.587 Subtotal: Hardware Cost Support - Program Management Cost Government Management Remarks: Justification: A12412 / HADES PAYLOADS AND PED - $80.587 million in FY 2027 Supports procurement of long-lead sensor suites, support, spares, and associated program management support for Project Director Sensors Aerial Intelligence (PD SAI) to include acquisition, logistics, engineering and test for HADES #1 and #2. LI 9697A12400 - HADES PLATFORM, PAYLOADS/PED, AND INTEGR... Army UNCLASSIFIED Page 9 of 11 P-1 Line #5 Volume 1 - 25 === page 62 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 10 P-1 Line Item Number / Title: 9697A12400 / HADES PLATFORM, PAYLOADS/PED, AND INTEGRATION ID Code (A=Service Ready, B=Not Service Ready) : Secondary Distribution Army Total: Secondary Distribution Item Number / Title [DODIC]: A12412 / HADES PAYLOADS AND PED MDAP/MAIS Code: FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total Quantity - - - - - Total Obligation Authority - 26.850 80.587 - 80.587 Quantity - - - - - Total Obligation Authority - 26.850 80.587 - 80.587 LI 9697A12400 - HADES PLATFORM, PAYLOADS/PED, AND INTEGR... Army UNCLASSIFIED Page 10 of 11 P-1 Line #5 Volume 1 - 26 === page 63 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Army P-1 Line Item Number / Title: 9697A12400 / HADES PLATFORM, PAYLOADS/PED, AND INTEGRATION Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 10 Prior Years MDAP/ Item Number / Title [DODIC] A12413 / MHABS AND PAYLOADS ID CD MAIS Code Unit Cost ($ K) - Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ K) - - - - - - Qty (Each) - FY 2026 Total Cost Unit Cost ($ M) ($ K) - - - - - - - Qty (Each) Aggregated Items Title: A12413 / MHABS AND PAYLOADS FY 2027 Base Total Cost Unit Cost ($ M) ($ K) - - - - - - 79.818 Qty (Each) FY 2027 OOC Total Cost ($ M) 192 15.325 192 15.325 - 15.325 Unit Cost ($ K) - Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) - - - - - - 79.818 Qty (Each) Total Cost ($ M) 192 15.325 192 15.325 - 15.325 Secondary Distribution Army Total - - Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. LI 9697A12400 - HADES PLATFORM, PAYLOADS/PED, AND INTEGR... Army - UNCLASSIFIED Page 11 of 11 - P-1 Line #5 - - Volume 1 - 27 === page 64 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 4742A05001 / UH-72 LAKOTA LIGHT UTILITY HELICOPTER Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 20: Rotary Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 479 3,214.254 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 3,214.254 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 3,214.254 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 479 10.000 - - - - - - - - - 3,224.254 - - - - - - - - - - 10.000 - - - - - - - - - - - - - - - - - - - 10.000 - - - - - - - - - Total 3,224.254 3,224.254 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 6,710.342 6,731.219 Description: The FY 2026 spend plan amount for UH-72 LAKOTA LIGHT UTILITY HELICOPTER includes $0 of discretionary and $98,000K of mandatory (reconciliation) for a total of $98,000K. The UH-72 platform will provide the flexibility to respond to Homeland Security (HLS) requirements, conduct civil search and rescue operations, support damage assessment, support test and training centers, perform generating force missions, augment the HH-60 Medical Evacuation (MEDEVAC) aircraft, and provide support to CONUS counterdrug operations. The UH-72 will conduct general support utility helicopter missions and execute tasks as part of an integrated effort with other joint services, government agencies, and non-governmental organizations. The UH-72 provides time-sensitive transport of supplies or key personnel, air mobility to assist civil authorities through the execution of search and rescue or disaster relief operations, advanced warning/detection of external threats to include threats to our borders, augmentation of air ambulance capabilities, and limited command and control operations in the conduct of HLS. As part of the Aviation Restructure Initiative (ARI) the UH-72 became the primary training aircraft at the US Army Aviation Center of Excellence (USAACE) in Fort Rucker. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 10.000 - - - - - - - - - - - - - - - - - 10.000 - - - - - - - - Justification: UH-72 LAKOTA LIGHT UTILITY HELICOPTER has no FY 2027 funding request. LI 4742A05001 - UH-72 LAKOTA LIGHT UTILITY HELICOPTER Army UNCLASSIFIED Page 1 of 1 P-1 Line #6 Volume 1 - 28 === page 65 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 5757A05111 / AH-64 Apache Block IIIA Reman Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 20: Rotary Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 202 Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 582 31 7 Gross/Weapon System Cost ($ in Millions) 12,010.345 667.759 361.669 Less PY Advance Procurement ($ in Millions) 2,294.424 110.360 Net Procurement (P-1) ($ in Millions) 9,715.921 557.399 Plus CY Advance Procurement ($ in Millions) 2,404.784 Total Obligation Authority ($ in Millions) 12,120.705 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - 1.552 - 1.552 1.551 0.554 0.554 - - - - - - 1.552 - 1.552 1.551 0.554 0.554 - - - - - - 1.552 - 1.552 1.551 0.554 361.669 - - 557.399 361.669 To FY 2031 Complete - Total Continuing Continuing 0.561 Continuing Continuing - Continuing Continuing 0.561 Continuing Continuing - Continuing Continuing 0.554 0.561 Continuing Continuing 0.000 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 119.715 7.979 0.000 0.000 - 0.000 0.000 0.000 0.000 Flyaway Unit Cost ($ in Thousands) 41.840 21.280 0.000 - - - - - - - Continuing Continuing 20,636.332 21,540.613 51,667.000 - - - - - - - Continuing Continuing Gross/Weapon System Unit Cost ($ in Thousands) Description: AH-64E Reman is a complete remanufacture using a new airframe and meets all the requirements for Army and Joint interoperability goals for the future and adds significant combat capability while addressing obsolescence issues, ensuring the aircraft remains a viable combat multiplier beyond its lifecycle. The Army's only heavy attack helicopter, the AH-64E is fully digital with the latest technologies, which adds significant combat capability to the aircraft. The AH-64E Apache is implementing an incremental design and fielding strategy as noted in the approved Capability Production Document (CPD). AH-64E Capability Version 1 includes Improved Drive and Propulsion System, Composite Main Rotor Blades (CMRB), Unmanned Aircraft System (UAS) Level III-IV Control, Improved Communications Suite, Improved Electronics / Modular Open Systems Approach, and Radar Electronics Unit (REU). Capability Version 4 includes Link 16, Air to Air to Ground (AAG) Video Relay, System Level Embedded Diagnostics (SLED), and provisions for Reduced-Size Crashworthy External Fuel Systems (RCEFS). Capability Version 6 includes Fire Control Radar (FCR) enhancements, Maritime Targeting Mode, Expanded Link-16, Image Blending, MultiMode Laser (MML), and Interactive Electronic Technical Manual (IETM) Upgrades. Production Lots 1-4 are Version 1 capable, Production Lots 5-8 are Version 4 capable, and Version 6 is included into the remaining Production Lots beginning with Production Lot 9. Upgrades are integrated as incremental block modifications. Other associated Government Furnished Equipment (GFE) such as the GEN2 Radar Frequency Interferometer (G2RFI), Radar Electronics Unit (REU), and Manned/Unmanned Teaming Extended Capability (MUMT-X) will be procured and provided in accordance with the basis of issue plan. The program addresses operational shortfalls identified during real-world combat missions, meets Apache Capability Production Document (CPD) requirements for modernization, and provides necessary training, initial spares, and Peculiar Ground Support Equipment (PGSE). AH-64E aircraft entered the fleet in 2012. Secondary Distribution Army FY 2025 Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 5757A05111 - AH-64 Apache Block IIIA Reman Army FY 2027 Base FY 2026 31 7 557.399 361.669 31 7 557.399 361.669 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - 1.552 - 1.552 1.551 0.554 0.554 0.561 - - - - - - - 1.552 - 1.552 1.551 0.554 0.554 0.561 UNCLASSIFIED Page 1 of 5 P-1 Line #7 Volume 1 - 29 === page 66 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 5757A05111 / AH-64 Apache Block IIIA Reman Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 20: Rotary Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 202 Exhibits Schedule Exhibit Type Title* P-5 A05111 / AH-64 Apache Block IIIA Reman P-40 Total Gross/Weapon System Cost Subexhibits P-5a ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 582 / 12,010.345 31 / 667.759 7 / 361.669 - / 1.552 - / - - / 1.552 582 / 12,010.345 31 / 667.759 7 / 361.669 - / 1.552 - / - - / 1.552 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 procurement dollars supports production line activities, airworthiness, and safety support of AH-64E Remanufacture aircraft deliveries. The program was restructured in 2010 from the single AH-64E Apache (A05111) into two separate programs: AH-64E Apache Reman (A05111) and AH-64E Apache New Build (A05133). In FY 2026 the Apache Project Managers Office (PM Apache) received a Congressional Increase for the procurement of additional AH-64E Remanufacture aircraft. The FY 2026 to FY 2027 funding decrease is due to the completion of AH-64E Remanufacture aircraft procurements. The current AH-64E Apache Remanufacture and New Build Army Procurement Objective (APO) is 791 Aircraft. The total AH-64E (Remanufacture and New Build) Army Acquisition Objective (AAO) is 812 Aircraft. The Apache Reman Program quantities and associated funding include Multi-Year contracts from FY 2017-FY 2021 and FY 2022-FY 2025. Currently, the total lead time (time from when first materials must be committed to aircraft delivery) is in excess of 36 months. The Cost Assessment and Program Evaluation (CAPE) Independent Cost Estimate (ICE) utilized 18% to 22% for Advance Procurement (AP). Each year's AP can be divided into two segments: 1) Government Furnished Equipment (GFE) such as: engines, sensors and avionics and 2) Contractor Furnished Equipment (CFE) such as: production components to support deliveries, provisioning material, pre-modification effort, and any potential termination liability costs. Long lead items include, but are not limited to, Main Rotor Drive Shaft, Composite Main Rotor Blade, Improved Drive System, and Composite Stabilator IAW Financial Management Regulation (FMR) 7000.14-R. LI 5757A05111 - AH-64 Apache Block IIIA Reman Army UNCLASSIFIED Page 2 of 5 P-1 Line #7 Volume 1 - 30 === page 67 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 5757A05111 / AH-64 Apache Block IIIA Reman Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: A05111 / AH-64 Apache Block IIIA Reman MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 582 31 7 Gross/Weapon System Cost ($ in Millions) 12,010.345 667.759 361.669 Less PY Advance Procurement ($ in Millions) 2,294.424 110.360 Net Procurement (P-1) ($ in Millions) 9,715.921 557.399 Plus CY Advance Procurement ($ in Millions) 2,404.784 Total Obligation Authority ($ in Millions) 12,120.705 FY 2027 Base FY 2027 OOC - - - 1.552 - 1.552 361.669 - - 557.399 361.669 FY 2027 Total - - - 1.552 - 1.552 - - - 1.552 - 1.552 - - - - - - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 20,636.332 - 21,540.613 51,667.000 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2026 Total Cost Unit Cost 51,428.571 ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost CFE (†) GFE 15,269.309 586 8,947.815 15,801.258 31 489.839 - - - - - - - - - 3,105.399 586 1,819.764 3,264.065 31 101.186 - - 7 360.000 - - - - - - - - - - Non-Recurring Costs - - 253.288 - - 2.000 - - - - - - - - - - - Support Equipment - - 168.477 - - - - - - - - - - - - - - - Other Costs - - 701.286 - - 66.755 - - 1.669 - - 1.552 - - - - - 1.552 Initial Spares - - 119.715 - - 7.979 - - - - - - - - - - - - - - 12,010.345 - - 667.759 - - 361.669 - - 1.552 - - - - - 1.552 - - 12,010.345 - - 667.759 - - 361.669 - - 1.552 - - - - - 1.552 582 12,010.345 31 667.759 361.669 - - 1.552 - - - - - 1.552 Subtotal: Recurring Cost Subtotal: Flyaway Cost Gross/Weapon System Cost 20,636.332 21,540.613 51,667.000 7 Remarks: The Prior Year quantity of 586 that is reported under the Flyaway Recurring Cost elements for CFE and GFE are correct. The Gross/Weapon System Cost quantity of 582 is being pulled from the P40 and cannot be updated. Other Costs are inclusive of the Apache PM cost share that is allocated by percentage across each funding line. Yearly adjustments in Other Costs correspond to increases or decreases across all Apache PM funding lines. These costs are for personnel that perform duties associated with Safety, Compliance, Training, Product Support, Engineering Services, and Logistics. LI 5757A05111 - AH-64 Apache Block IIIA Reman Army UNCLASSIFIED Page 3 of 5 P-1 Line #7 Volume 1 - 31 === page 68 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 P-1 Line Item Number / Title: 5757A05111 / AH-64 Apache Block IIIA Reman ID Code (A=Service Ready, B=Not Service Ready) : Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority Item Number / Title [DODIC]: A05111 / AH-64 Apache Block IIIA Reman MDAP/MAIS Code: FY 2025 FY 2027 Base FY 2026 31 7 557.399 361.669 31 7 557.399 361.669 FY 2027 OOC FY 2027 Total - - - 1.552 - 1.552 - - - 1.552 - 1.552 indicates the presence of a P-5a LI 5757A05111 - AH-64 Apache Block IIIA Reman Army UNCLASSIFIED Page 4 of 5 P-1 Line #7 Volume 1 - 32 === page 69 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 Item Number / Title [DODIC]: A05111 / AH-64 Apache Block IIIA Reman FY Contractor and Location Method/Type or Funding Vehicle CFE 2014 The Boeing Company / Mesa, AZ SS / FPIF AMCOM Mar 2014 Feb 2015 35 15,570.229 Y Jul 2012 CFE 2015 The Boeing Company / Mesa, AZ SS / FPIF AMCOM Mar 2015 Feb 2016 53 14,679.510 Y Aug 2014 CFE 2016 The Boeing Company / Mesa, AZ SS / FPIF AMCOM Mar 2016 Jan 2017 64 13,759.470 Y Aug 2014 CFE 2017 The Boeing Company / Mesa, AZ SS / FFP AMCOM Mar 2017 Jan 2019 52 13,565.810 Y Aug 2015 CFE 2018 The Boeing Company / Mesa, AZ SS / FFP AMCOM Mar 2018 Jul 2019 48 12,956.958 Y Aug 2015 CFE 2019 The Boeing Company / Mesa, AZ SS / FFP AMCOM Mar 2019 Jul 2020 48 13,794.229 Y Aug 2015 CFE 2020 The Boeing Company / Mesa, AZ SS / FFP AMCOM Mar 2020 May 2021 49 13,969.796 Y Aug 2015 CFE 2021 The Boeing Company / Mesa, AZ SS / FFP AMCOM Mar 2021 Jun 2022 50 13,915.120 Y Aug 2015 CFE 2022 The Boeing Company / Mesa, AZ SS / FFP AMCOM Mar 2022 Aug 2024 24 17,217.083 Y Feb 2020 CFE 2023 The Boeing Company / Mesa, AZ SS / FFP AMCOM Mar 2023 Apr 2025 38 15,836.105 Y Feb 2020 CFE 2024 The Boeing Company / Mesa, AZ SS / FFP AMCOM Mar 2024 Feb 2026 37 16,379.486 Y Feb 2020 CFE 2025 The Boeing Company / Mesa, AZ SS / FFP AMCOM Mar 2025 Jan 2027 31 15,801.258 Y Feb 2020 CFE 2026 The Boeing Company / Mesa, AZ SS / FFP AMCOM Dec 2026 Jul 2029 7 51,428.571 Y Sep 2026 Cost Elements O O C P-1 Line Item Number / Title: 5757A05111 / AH-64 Apache Block IIIA Reman Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date Remarks: Major Contractor Furnished Equipment (CFE) cost drivers include, but are not limited to: Fuselage, Transmission, and Composite Main Rotor Blades. Major Government Furnished Equipment (GFE) include: engines, Embedded Global Positioning System Inertial Navigation Systems (EGIs), Radar Electronics Unit (REU), GEN2 Target Acquisition Designation System (TADS)/Pilot Night Vision System (PNVS) and Manned/Unmanned Teaming Extended Capability (MUMTX). Other Cost includes Support Equipment, Peculiar Ground Support Equipment (PGSE), and Government Program Management Support. Delivery schedules appear to extend beyond the 12 month period for the following reasons: yearly procurement consist of AH-64E Remanufactured and New Build aircraft. Both variants are awarded on different contract line items. While each of these efforts deliver all of their aircraft within a 12 month span, they do not deliver within the same 12 month time period. In FY 2022 supply chain delivery delays experienced during the COVID-19 global pandemic delayed the initial deliveries and increased production lead time by approximately one year. Subsequently, the Army and Boeing adjusted the production capacity downward (from 98 to 82 A/C per year) with a bilateral agreement which was negotiated as part of the MYII contract awarded in March 2023. There is no gap between MYI and MYII deliveries. FY 2022 deliveries started in Aug 2024, FY 2023 deliveries started in Apr 2025, FY 2024 deliveries will start in Feb 2026, and FY 2025 deliveries will start in Jan 2027. LI 5757A05111 - AH-64 Apache Block IIIA Reman Army UNCLASSIFIED Page 5 of 5 P-1 Line #7 Volume 1 - 33 === page 70 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 6761A12000 / Future Vertical Lift FAMILY OF SYSTEMS Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 20: Rotary Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 To FY 2031 Complete FY 2029 FY 2030 8 12 20 27 Continuing Continuing 3,021.022 Continuing Continuing Procurement Quantity (Units in Each) - - - - - - Gross/Weapon System Cost ($ in Millions) - - - 0.000 - 0.000 873.960 1,640.187 2,523.506 Less PY Advance Procurement ($ in Millions) - - - - - - 127.217 209.456 328.025 Net Procurement (P-1) ($ in Millions) - - - 0.000 - 0.000 746.743 1,430.731 2,195.481 Plus CY Advance Procurement ($ in Millions) - - - 127.217 - 127.217 209.456 328.025 466.564 Total Obligation Authority ($ in Millions) - - - 127.217 - 127.217 956.199 1,758.756 2,662.045 466.564 Total Continuing Continuing 2,554.458 Continuing Continuing 672.844 Continuing Continuing 3,227.302 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - 109,245.000 136,682.250 126,175.300 111,889.704 Continuing Continuing Description: The Future Long Range Assault Aircraft (FLRAA) Project's funding provides Combatant Commanders with deterrence, power projection, and tactical capabilities at operational and strategic distances. The MV-75 FLRAA will retain the Army's ability to project combat power with significantly increased range, speed, mobility, and payload over current Army and Special Operations Command (SOCOM) aircraft. MV-75 FLRAA is the next generation vertical lift aircraft designed to conduct air assault, urban assault/security, maritime interdiction, medical evacuation, humanitarian assistance/disaster relief, tactical resupply, direct action, noncombatant evacuation operations, and combat search and rescue operations. FLRAA will support the Army, including Special Operations Command (USSOCOM) and the Joint Force, in a contested, near peer threat environment. The MV-75 is the first Army vertical lift aircraft purpose-built using a Modular Open Systems Approach (MOSA) and an intellectual property strategy to only obtain the data rights necessary to maintain the Army's right to repair and upgrade the weapon system, better utilizing a more robust supply chain and the defense industrial base than previous weapon systems. In FY 2024, FLRAA achieved a successful Milestone B decision allowing the program to enter into the Engineering and Manufacturing Development (EMD) phase. In FY 2025, the Secretary of the Army directed the acceleration of production and fielding the MV-75 FLRAA weapon system to ensure the long-range air assault and aeromedical evacuation capabilities will be available for any potential future conflicts in the Indo-Pacific region or eastern Europe. Secondary Distribution Army Total: Secondary Distribution FY 2025 FY 2027 Base FY 2026 Quantity - - Total Obligation Authority - - Quantity - - Total Obligation Authority - - LI 6761A12000 - Future Vertical Lift FAMILY OF SYSTEMS Army FY 2027 OOC - 127.217 127.217 UNCLASSIFIED Page 1 of 4 FY 2027 Total - FY 2028 - 127.217 FY 2030 FY 2031 8 12 20 27 956.199 1,758.756 2,662.045 3,227.302 127.217 FY 2029 8 12 20 27 956.199 1,758.756 2,662.045 3,227.302 P-1 Line #8 Volume 1 - 34 === page 71 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 6761A12000 / Future Vertical Lift FAMILY OF SYSTEMS Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 20: Rotary ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 A12002 / Future Long Range Assault Aircraft (FLRAA) P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code 550 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / - - / - - / 0.000 - / - - / 0.000 - / - - / - - / - - / 0.000 - / - - / 0.000 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Future Vertical Lift Family of Systems is an FY 2027 New start The FY 2027 budget request of $127.217 million procures the long-lead materials and Government Furnished Equipment (GFE) to support the first lot of Low Rate Initial Production (LRIP) of eight (8) MV-75 Future Long Range Assault Aircraft (FLRAA), which are planned for procurement in FY 2028. This represents a one-year acceleration from planned procurement as required to meet Secretary of the Army goals in preparation for future potential near-peer or peer-peer conflicts. Advance Procurement authority is required to procure critical components with manufacturing lead times that would otherwise create a delay to the accelerated production schedule requested by the Secretary of the Army. The urgent need for the capability offered by the MV-75 has driven the Army to pursue a production schedule one year earlier than previously planned, compressing build times and requiring both CFE and GFE acquisitions early in the production process. Key CFE components for the MV-75 involve complex manufacturing tooling and materials, some of which have estimated lead times in excess of twenty four months. These include the high-performance RollsRoyce AE 1107 engines, specialized composite materials for the airframe and wing, and advanced titanium alloys used structural components and landing gear. Long-lead GFE, particularly the Degraded Visual Environment Pilotage System (DVEPS) and tactical communications suites have lead times in excess of 24 months and also require procurement on an accelerated timeline to ensure they are available for assembly, integration, test and checkout for accelerated MV-75 delivery. LI 6761A12000 - Future Vertical Lift FAMILY OF SYSTEMS Army UNCLASSIFIED Page 2 of 4 P-1 Line #8 Volume 1 - 35 === page 72 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6761A12000 / Future Vertical Lift FAMILY OF SYSTEMS Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: A12002 / Future Long Range Assault Aircraft (FLRAA) MDAP/MAIS Code: 550 FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - - 0.000 - 0.000 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - - 0.000 - 0.000 Plus CY Advance Procurement ($ in Millions) - - - 127.217 - 127.217 Total Obligation Authority ($ in Millions) - - - 127.217 - 127.217 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost Airframe/CFE - - - - - - - - - - - - - - - - - 0.000 Engines - - - - - - - - - - - - - - - - - 0.000 CFE Avionics - - - - - - - - - - - - - - - - - 0.000 GFE Avionics - - - - - - - - - - - - - - - - - 0.000 Engineering Change Orders (Recurring) - - - - - - - - - - - - - - - - - 0.000 Subtotal: Recurring Cost - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Technical Publications - - - - - - - - - - - - - - - - - 0.000 Subtotal: Support - Data Cost - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.000 Non Recurring Cost Tooling Subtotal: Non Recurring Cost Subtotal: Flyaway Cost Support - Data Cost Support - Initial Spares and Repair Parts Cost Initial Spares and Repair Parts - LI 6761A12000 - Future Vertical Lift FAMILY OF SYSTEMS Army UNCLASSIFIED Page 3 of 4 P-1 Line #8 Volume 1 - 36 === page 73 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6761A12000 / Future Vertical Lift FAMILY OF SYSTEMS Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: A12002 / Future Long Range Assault Aircraft (FLRAA) MDAP/MAIS Code: 550 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) Subtotal: Support - Initial Spares and Repair Parts Cost FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - - - - - - - - - - - - - - - - - Integrated Logistics Support - - - - - - - - - - - - - - - - - 0.000 Subtotal: Support - Logistics Cost - - - - - - - - - - - - - - - - - - Support - Logistics Cost Support - Peculiar Support Equipment Cost Support and Handling Equipment - - - - - - - - - - - - - - - - - 0.000 Subtotal: Support - Peculiar Support Equipment Cost - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - - Support - Program Management Cost Government Management Subtotal: Support - Program Management Cost Support - Training Cost - - - - - - - - - - - - - - - - - 0.000 Subtotal: Support - Training Cost Equipment - - - - - - - - - - - - - - - - - - Gross/Weapon System Cost - - - - - - - - - - - 0.000 - - - - - 0.000 Remarks: The FY 2027 Budget Request supports Advance Procurement required for meeting FY 2029 fielding of Low Rate Initial Production (LRIP) aircraft planned for procurement in FY 2028. Secondary Distribution Army Total: Secondary Distribution FY 2025 FY 2027 Base FY 2026 Quantity - - Total Obligation Authority - - Quantity - - Total Obligation Authority - - LI 6761A12000 - Future Vertical Lift FAMILY OF SYSTEMS Army UNCLASSIFIED Page 4 of 4 FY 2027 OOC 127.217 127.217 P-1 Line #8 FY 2027 Total - 127.217 127.217 Volume 1 - 37 === page 74 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 20: Rotary P-1 Line Item Number / Title: 6761A12000 / Future Vertical Lift FAMILY OF SYSTEMS Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Gross/Weapon System Cost ($ in Millions) - - - 127.217 - 127.217 209.456 328.025 466.564 672.844 Continuing Continuing Net Procurement (P-1) ($ in Millions) - - - 127.217 - 127.217 209.456 328.025 466.564 672.844 Continuing Continuing Total Obligation Authority ($ in Millions) - - - 127.217 - 127.217 209.456 328.025 466.564 672.844 Continuing Continuing Description: The Future Long Range Assault Aircraft (FLRAA) Project's funding provides Combatant Commanders with deterrence, power projection, and tactical capabilities at operational and strategic distances. The Multimission Vertical takeoff (MV)-75 FLRAA will retain the Army's ability to project combat power with significantly increased range, speed, mobility, and payload over current Army and Special Operations Command (SOCOM) aircraft. MV-75 FLRAA is the next generation vertical lift aircraft designed to conduct air assault, urban assault/security, maritime interdiction, medical evacuation, humanitarian assistance/disaster relief, tactical resupply, direct action, noncombatant evacuation operations, and combat search and rescue operations. FLRAA will support the Army, including Special Operations Command (USSOCOM) and the Joint Force, in a contested, near peer threat environment. The MV-75 is the first Army vertical lift aircraft purpose built using a Modular Open Systems Approach (MOSA) and an intellectual property strategy to obtain the data rights necessary to maintain the Army's right to repair and upgrade the weapon system, better utilizing a more robust supply chain and the defense industrial base than previous weapon systems. In FY 2024, FLRAA achieved a successful Milestone B decision allowing the program to enter into the Engineering and Manufacturing Development (EMD) phase. In FY 2025, the Secretary of the Army directed the acceleration of production and fielding the MV-75 FLRAA weapon system as part of the Secretary of the Army direction to accelerate MV-75 production and fielding to ensure the long-range air assault and aeromedical evacuation capabilities will be available for any potential future near-peer or peer-peer conflicts. LI 6761A12000 - Future Vertical Lift FAMILY OF SYSTEMS Army UNCLASSIFIED Page 1 of 4 P-1 Line #9 Volume 1 - 38 === page 75 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 20: Rotary P-1 Line Item Number / Title: 6761A12000 / Future Vertical Lift FAMILY OF SYSTEMS Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-10 A12002 / Future Long Range Assault Aircraft (FLRAA) - / - - / - - / - - / 127.217 - / - - / 127.217 P-40 Total Gross/Weapon System Cost - / - - / - - / - - / 127.217 - / - - / 127.217 *Title represents the P-10 Title for Advance Procurement. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 budget request of $127.217 million procures the long-lead materials and Government Furnished Equipment (GFE) to support the first lot of Low Rate Initial Production (LRIP) of eight (8) MV-75 Future Long Range Assault Aircraft (FLRAA), which are planned for procurement in FY 2028. This represents a one-year acceleration from planned procurement as required to meet Army Transformation Initiative (ATI) goals. LI 6761A12000 - Future Vertical Lift FAMILY OF SYSTEMS Army UNCLASSIFIED Page 2 of 4 P-1 Line #9 Volume 1 - 39 === page 76 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Army P-1 Line Item Number / Title: 6761A12000 / Future Vertical Lift FAMILY OF SYSTEMS Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 Date: April 2026 P-5 Number / Title: A12002 / Future Long Range Assault Aircraft (FLRAA) MDAP/MAIS Code: 550 First System (2027) Award Date: November 2026 First System (2027) Completion Date: April 2029 Future Long Range Assault Aircraft (FLRAA) Production Leadtime Interval Between Systems: 2 Months Prior Years (Months) FY 2025 (Each) Quantity Cost Elements When Required Prior Years (Months) FY 2026 (Each) FY 2025 ($ M) FY 2027 (Each) (Each) FY 2026 ($ M) FY 2027 ($ M) ($ M) CFE MV-75 Long Lead CFE - - - - 121.554 - - - 121.554 - - - 5.663 Total: GFE - - - 5.663 Total Advance Procurement/Obligation Authority - - - 127.217 Total: CFE GFE MV-75 Long Lead GFE LI 6761A12000 - Future Vertical Lift FAMILY OF SYSTEMS Army - UNCLASSIFIED Page 3 of 4 P-1 Line #9 Volume 1 - 40 === page 77 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 P-1 Line Item Number / Title: 6761A12000 / Future Vertical Lift FAMILY OF SYSTEMS Date: April 2026 P-5 Number / Title: A12002 / Future Long Range Assault Aircraft (FLRAA) FY 2027 Cost Elements Production Leadtime QPA (Months) (Each) Unit Cost ($ K) Contract Forecast Date 2027 Qty (Each) For FY Total Cost Request ($ M) CFE MV-75 Long Lead CFE 1 2028 Total: CFE 121.554 121.554 GFE MV-75 Long Lead GFE 1 2028 Total: GFE 5.663 5.663 Total Advance Procurement/Obligation Authority 127.217 Description: The Future Long Range Assault Aircraft (FLRAA) Project's funding provides Combatant Commanders with deterrence, power projection, and tactical capabilities at operational and strategic distances. FLRAA will retain the Army's ability to project combat power with significantly increased range, speed, mobility, and payload over current Army and Special Operations Command (SOCOM) aircraft. FLRAA is the next generation vertical lift aircraft designed to conduct air assault, urban assault/security, maritime interdiction, medical evacuation, humanitarian assistance/disaster relief, tactical resupply, direct action, noncombatant evacuation operations, and combat search and rescue operations. FLRAA will support the Army, including Special Operations Command (USSOCOM) and the Joint Force, in a contested, near peer threat environment. In FY 2024, FLRAA achieved a successful Milestone B decision allowing the program to enter into the Engineering and Manufacturing Development (EMD) phase. In FY 2025, the Secretary of the Army directed the acceleration of production and fielding the MV-75 FLRAA weapon system as part of the Secretary of the Army direction to accelerate MV-75 production and fielding to ensure the long-range air assault and aeromedical evacuation capabilities will be available for any potential future near-peer or peer-peer conflicts. LI 6761A12000 - Future Vertical Lift FAMILY OF SYSTEMS Army UNCLASSIFIED Page 4 of 4 P-1 Line #9 Volume 1 - 41 === page 78 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 6771AA0005 / UH-60 Blackhawk M Model (MYP) Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 20: Rotary Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2027 Base FY 2027 OOC FY 2027 Total FY 2026 1,257 26 29 1 - 1 1 1 1 Gross/Weapon System Cost ($ in Millions) 24,190.569 861.548 971.230 104.257 - 104.257 39.233 39.229 39.229 Less PY Advance Procurement ($ in Millions) 4,672.871 92.494 58.170 65.000 - 65.000 - - - Net Procurement (P-1) ($ in Millions) 19,517.698 769.054 913.060 39.257 - 39.257 39.233 39.229 39.229 Plus CY Advance Procurement ($ in Millions) 4,765.365 58.170 65.000 - - - - - - Total Obligation Authority ($ in Millions) 24,283.063 827.224 978.060 39.257 - 39.257 39.233 39.229 39.229 Procurement Quantity (Units in Each) FY 2028 FY 2029 To FY 2031 Complete FY 2025 FY 2030 1 Total Continuing Continuing 39.229 Continuing Continuing - Continuing Continuing 39.229 Continuing Continuing - Continuing Continuing 39.229 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 19,244.685 33,136.462 33,490.690 104,257.000 - 104,257.000 39,233.000 39,229.000 39,229.000 39,229.000 Continuing Continuing Description: The Utility Helicopter (UH)-60M Black Hawk Helicopter serves as the Army's utility helicopter for the near and midterm force and is in line with the Army's Modernization Strategy, the National Military Strategy, and the National Defense Strategy. The UH-60M Black Hawk is a digital networked platform with greater range and lift to support maneuver Commanders through air assault, general support command and control, and aeromedical evacuation. Full rate production for this new build helicopter began in 2007. The current UH-60 Army Acquisition Objective (AAO) is 1957 which will be obtained by continued procurement of UH-60M. The HH-60M is a version of the UH-60M that includes an integrated Medical Evacuation (MEDEVAC) Mission Equipment Package (MEP). The HH-60M provides the joint services with an aeromedical evacuation capability enabling the Critical Care Flight Paramedic (CCFP) to provide lifesaving, enroute medical treatment to casualties who have suffered survivable wounds. Aeromedical evacuation builds the morale of the warfighter while clearing the battlefield allowing the tactical commander to continue the mission. Secondary Distribution Army FY 2025 Quantity Total Obligation Authority ANG Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 6771AA0005 - UH-60 Blackhawk M Model (MYP) Army FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 9 23 1 - 1 1 1 1 1 277.111 790.250 39.257 - 39.257 39.233 39.229 39.229 39.229 - 17 6 - - - - - - 550.113 187.810 - - - - - - 26 29 1 - 1 1 1 1 1 827.224 978.060 39.257 - 39.257 39.233 39.229 39.229 39.229 UNCLASSIFIED Page 1 of 10 P-1 Line #10 - Volume 1 - 42 === page 79 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 6771AA0005 / UH-60 Blackhawk M Model (MYP) Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 20: Rotary Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 A05002 / UH-60 BLACK HAWK (MYP) P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 1,257 / 24,190.569 26 / 861.548 29 / 971.230 1 / 104.257 - / - 1 / 104.257 1,257 / 24,190.569 26 / 861.548 29 / 971.230 1 / 104.257 - / - 1 / 104.257 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 President's Budget request included a total of $104.257M. These funds include $39.257M in UH-60 Blackhawk M Model (MYP) and a $65.000M congressional add in Advanced Procurement. The $65.000M congressional add will be utilized to procure long lead items in support of the new H-60M production contract. FY 2026 to FY 2027 decrease is due to less quantities of A/C procured. In accordance with section 1815 of the FY 2008 NDAA (Public Law (P.L.) 110-118), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 6771AA0005 - UH-60 Blackhawk M Model (MYP) Army UNCLASSIFIED Page 2 of 10 P-1 Line #10 Volume 1 - 43 === page 80 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6771AA0005 / UH-60 Blackhawk M Model (MYP) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: A05002 / UH-60 BLACK HAWK (MYP) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total 1,257 26 29 1 - 1 24,190.569 861.548 971.230 104.257 - 104.257 Less PY Advance Procurement ($ in Millions) 4,672.871 92.494 58.170 65.000 - 65.000 Net Procurement (P-1) ($ in Millions) 19,517.698 769.054 913.060 39.257 - 39.257 Plus CY Advance Procurement ($ in Millions) 4,765.365 58.170 65.000 - - - Total Obligation Authority ($ in Millions) 24,283.063 827.224 978.060 39.257 - 39.257 - - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 19,244.685 - 33,136.462 33,490.690 104,257.000 - - 104,257.000 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($ K) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost (†) Airframes/CFE Engines/Accessories 13,231.443 1,261 16,684.849 22,396.500 26 582.309 22,970.310 29 666.139 71,322.000 1 71.322 - - - 71,322.000 1 756.979 2,522 1,909.101 1,327.938 48 63.741 1,321.466 58 76.645 1,321.500 2 2.643 - - - 1,321.500 2 871.250 - - 23.726 - - 23.611 - - 15.598 - - - - - 71.322 2.643 Avionics (GFE) - - Other GFE - - 471.071 - - 11.715 - - 11.658 - - 7.702 - - - - - 7.702 - - 19,936.271 - - 681.491 - - 778.053 - - 97.265 - - - - - 97.265 ECO (All FLYAWAY Components) - - 684.355 - - 26.331 - - 26.202 - - 1.090 - - - - - 1.090 Other Costs (Mission Equipment) - - 964.122 - - 37.708 - - 37.524 - - 1.564 - - - - - 1.564 Tooling Equipment - - 108.462 - - 0.568 - - 0.566 - - - - - - - - - Other Nonrecurring Cost - - 90.757 - - 0.603 - - 14.600 - - 0.025 - - - - - 0.025 Subtotal: Non Recurring Cost - - 1,847.696 - - 65.210 - - 78.892 - - 2.679 - - - - - 2.679 - - 21,783.967 - - 746.701 - - 856.945 - - 99.944 - - - - - 99.944 Technical Publications - - 59.493 - - 5.259 - - 5.233 - - - - - - - - - Subtotal: Support - Data Cost - - 59.493 - - 5.259 - - 5.233 - - - - - - - - - Subtotal: Recurring Cost 15.598 Non Recurring Cost Subtotal: Flyaway Cost Support - Data Cost Support - Fielding Cost LI 6771AA0005 - UH-60 Blackhawk M Model (MYP) Army UNCLASSIFIED Page 3 of 10 P-1 Line #10 Volume 1 - 44 === page 81 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6771AA0005 / UH-60 Blackhawk M Model (MYP) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: A05002 / UH-60 BLACK HAWK (MYP) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) Fielding Subtotal: Support - Fielding Cost FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) Qty ($ K) FY 2027 Total Total Cost (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - 1,104.986 - - 64.929 - - 64.612 - - 2.692 - - - - - 2.692 - - 1,104.986 - - 64.929 - - 64.612 - - 2.692 - - - - - 2.692 - - 662.514 - - 39.061 - - 38.871 - - 1.620 - - - - - 1.620 - - 662.514 - - 39.061 - - 38.871 - - 1.620 - - - - - 1.620 - - 579.609 - - 5.598 - - 5.569 - - - - - - - - - - - 579.609 - - 5.598 - - 5.569 - - - - - - - - - 1,257 24,190.569 26 861.548 - - - Support - Program Management Cost Government Management Subtotal: Support - Program Management Cost Support - Training Cost Equipment Subtotal: Support - Training Cost Gross/Weapon System Cost 19,244.685 33,136.462 Secondary Distribution Army Quantity Total Obligation Authority ANG Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority 33,490.690 29 971.230 104,257.000 FY 2025 1 104.257 FY 2027 Base FY 2026 104,257.000 FY 2027 OOC 1 104.257 FY 2027 Total 9 23 1 - 1 277.111 790.250 39.257 - 39.257 17 6 - - - 550.113 187.810 - - - 26 29 1 - 1 827.224 978.060 39.257 - 39.257 indicates the presence of a P-5a LI 6771AA0005 - UH-60 Blackhawk M Model (MYP) Army UNCLASSIFIED Page 4 of 10 P-1 Line #10 Volume 1 - 45 === page 82 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 FY Contractor and Location (†) 2022 Sikorsky Aircraft / Stratford CT SS / FFP ACC-Redstone Dec 2021 Jul 2022 31 20,616.226 Y Aug 2018 (†) 2023 Sikorsky Aircraft / Stratford CT SS / FFP ACC-Redstone Dec 2022 Jul 2023 35 21,792.886 Y Aug 2018 (†) 2024 Sikorsky Aircraft / Stratford CT SS / FFP ACC-Redstone Dec 2023 Jul 2024 26 21,179.308 Y Aug 2018 (†) 2025 Sikorsky Aircraft / Stratford CT SS / FFP ACC-Redstone Dec 2024 Jul 2025 26 22,396.500 Y Aug 2018 (†) 2026 Sikorsky Aircraft / Stratford CT SS / FFP ACC-Redstone Dec 2025 Jul 2026 29 22,970.310 Y Aug 2018 (†) 2027 Sikorsky Aircraft / Stratford CT SS / FFP ACC-Redstone Jun 2027 Jan 2028 1 71,322.000 Y Jul 2024 Airframes/CFE Airframes/CFE Airframes/CFE Airframes/CFE Airframes/CFE Airframes/CFE (†) Item Number / Title [DODIC]: A05002 / UH-60 BLACK HAWK (MYP) Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 6771AA0005 / UH-60 Blackhawk M Model (MYP) Location of PCO Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($ K) RFP Issue Date indicates the presence of a P-21 LI 6771AA0005 - UH-60 Blackhawk M Model (MYP) Army UNCLASSIFIED Page 5 of 10 P-1 Line #10 Volume 1 - 46 === page 83 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6771AA0005 / UH-60 Blackhawk M Model (MYP) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: A05002 / UH-60 BLACK HAWK (MYP) Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Airframes/CFE Prior Years Deliveries: 1169 1 2022 ARMY 31 0 31 1 2023 ARMY 35 0 35 A - - - - - - - 2 2 2 2 2 3 3 1 2024 ARMY 26 0 26 26 1 2025 ARMY 26 0 26 26 1 2026 ARMY 29 0 29 29 1 2027 ARMY 1 0 1 A - 3 - 3 - 3 - 3 - 3 - 0 - 3 3 3 26 1 O C T N O V D E C LI 6771AA0005 - UH-60 Blackhawk M Model (MYP) Army J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 47 === page 84 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6771AA0005 / UH-60 Blackhawk M Model (MYP) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: A05002 / UH-60 BLACK HAWK (MYP) Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Airframes/CFE Prior Years Deliveries: 1169 1 2022 ARMY 31 31 0 1 2023 ARMY 35 9 26 1 2024 ARMY 26 0 26 1 2025 ARMY 26 0 26 1 2026 ARMY 29 0 29 1 2027 ARMY 1 0 1 0 3 3 3 3 A - 3 - 3 - 3 - 3 - 2 - 0 - 3 3 3 3 3 3 3 A - 3 - 2 - 0 - - - - 2 2 2 20 29 1 O C T N O V D E C LI 6771AA0005 - UH-60 Blackhawk M Model (MYP) Army J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 48 === page 85 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6771AA0005 / UH-60 Blackhawk M Model (MYP) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: A05002 / UH-60 BLACK HAWK (MYP) Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Airframes/CFE Prior Years Deliveries: 1169 1 2022 ARMY 31 31 0 0 1 2023 ARMY 35 35 0 0 1 2024 ARMY 26 26 0 1 2025 ARMY 26 6 20 1 2026 ARMY 29 0 29 1 2027 ARMY 1 0 1 0 2 2 2 2 A - 2 - 2 - 2 - 2 - 2 - 2 - 0 2 2 2 2 2 2 2 2 2 2 2 2 5 A O C T N O V D E C LI 6771AA0005 - UH-60 Blackhawk M Model (MYP) Army J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 49 1 === page 86 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6771AA0005 / UH-60 Blackhawk M Model (MYP) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: A05002 / UH-60 BLACK HAWK (MYP) Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Airframes/CFE Prior Years Deliveries: 1169 1 2022 ARMY 31 31 0 0 1 2023 ARMY 35 35 0 0 1 2024 ARMY 26 26 0 0 1 2025 ARMY 26 26 0 0 1 2026 ARMY 29 24 5 1 2027 ARMY 1 0 1 5 O C T N O V D E C LI 6771AA0005 - UH-60 Blackhawk M Model (MYP) Army 1 J A N 0 F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 50 === page 87 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6771AA0005 / UH-60 Blackhawk M Model (MYP) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: A05002 / UH-60 BLACK HAWK (MYP) Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Sikorsky Aircraft - Stratford CT MSR For 2027 1-8-5 For 2027 MAX For 2027 18 72 72 ALT Prior to Oct 1 ALT After Oct 1 8 Reorder Manufacturing PLT 3 6 Total After Oct 1 ALT Prior to Oct 1 9 ALT After Oct 1 0 Manufacturing PLT 3 Total After Oct 1 6 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 6771AA0005 - UH-60 Blackhawk M Model (MYP) Army UNCLASSIFIED Page 10 of 10 P-1 Line #10 Volume 1 - 51 9 === page 88 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 20: Rotary P-1 Line Item Number / Title: 6771AA0005 / UH-60 Blackhawk M Model (MYP) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Gross/Weapon System Cost ($ in Millions) 4,765.365 58.170 65.000 - - - - - - - Continuing Continuing Net Procurement (P-1) ($ in Millions) 4,765.365 58.170 65.000 - - - - - - - Continuing Continuing Total Obligation Authority ($ in Millions) 4,765.365 58.170 65.000 - - - - - - - Continuing Continuing Description: The Advance Procurement (AP) for the H-60M Black Hawk is separated into two main components: 1. Government Furnished Equipment (GFE) and 2. Contractor Furnished Equipment (CFE). 1. The GFE AP includes turbo-shaft engines, multi-function displays, Embedded Global Positioning System Inertial Navigation System (EGI), Heads Up Display (HUD) Aviation Night Vision Imaging System (AN/ AVS-7) communication and navigation avionics, radios, antennas, radio receiver transmitters, speech security equipment, H-60M flyaway equipment. These GFE components are H-60M direct procurement items. The GFE AP provided by PM Aviation Mission Systems and Architecture (AMSA) includes the AN/ARC-231 receiver/transmitter, Improved Data Modem (IDM), and signal comparator. 2. The CFE AP includes long lead material, parts, components, any potential termination liability cost, and effort for long lead items to maintain production schedule. Efforts include but are not limited to provisioning, material handling, component assembly, and direct labor. LI 6771AA0005 - UH-60 Blackhawk M Model (MYP) Army UNCLASSIFIED Page 1 of 4 P-1 Line #11 Volume 1 - 52 === page 89 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 20: Rotary P-1 Line Item Number / Title: 6771AA0005 / UH-60 Blackhawk M Model (MYP) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-10 A05002 / UH-60 BLACK HAWK (MYP) 1,257 / 4,765.365 26 / 58.170 29 / 65.000 1/ - - / - 1/ - P-40 Total Gross/Weapon System Cost 1,257 / 4,765.365 26 / 58.170 29 / 65.000 1/ - - / - 1/ - *Title represents the P-10 Title for Advance Procurement. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Current available funds may be utilized to procure long lead items in support of H-60M continued production. LI 6771AA0005 - UH-60 Blackhawk M Model (MYP) Army UNCLASSIFIED Page 2 of 4 P-1 Line #11 Volume 1 - 53 === page 90 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Army P-1 Line Item Number / Title: 6771AA0005 / UH-60 Blackhawk M Model (MYP) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 First System (2027) Award Date: May 2005 First System (2027) Completion Date: June 2006 UH-60 BLACK HAWK (MYP) Production Leadtime FY 2025 (Each) 1,257 When Required Prior Years (Months) FY 2026 (Each) Quantity Cost Elements P-5 Number / Title: A05002 / UH-60 BLACK HAWK (MYP) Interval Between Systems: 18 Months Prior Years (Months) Date: April 2026 26 FY 2025 ($ M) FY 2027 (Each) (Each) 29 FY 2026 ($ M) 1 FY 2027 ($ M) ($ M) Other Prior Year - 2,531.426 - - - 1,025.176 19.167 43.170 - - - - 30.484 2.643 - 4.737 10.669 - 0.889 2.002 - - - - 1.282 2.887 - 0.120 0.271 - 0.471 1.061 - Airframe - Contractor Furnished Equipment (CFE) 6 Auxiliary Power Unit (APU) 3 49.990 Engines 3 897.960 Embedded GPS Inertial (EGI) 3 140.781 Heads Up Display (HUD) AVS-7 3 42.022 Avionics - Communication / Navigation 3 66.202 Blade Fold Kits 3 5.233 Seat Pallets 3 0.493 Multi-Function Operator Seat (MFOS) 3 1.923 Signal Data Converter (SDC) 3 4.159 1.020 2.297 - Total: Other 4,765.365 58.170 65.000 - Total Advance Procurement/Obligation Authority 4,765.365 58.170 65.000 - LI 6771AA0005 - UH-60 Blackhawk M Model (MYP) Army UNCLASSIFIED Page 3 of 4 P-1 Line #11 Volume 1 - 54 === page 91 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 P-1 Line Item Number / Title: 6771AA0005 / UH-60 Blackhawk M Model (MYP) Date: April 2026 P-5 Number / Title: A05002 / UH-60 BLACK HAWK (MYP) FY 2027 Cost Elements Production Leadtime QPA (Months) (Each) Unit Cost ($ K) Contract Forecast Date 2027 Qty (Each) For FY Total Cost Request ($ M) Other Prior Year - - Airframe - Contractor Furnished Equipment (CFE) 1 - Auxiliary Power Unit (APU) 1 - Engines 2 - Embedded GPS Inertial (EGI) 2 - Heads Up Display (HUD) AVS-7 2 - Avionics - Communication / Navigation 1 - Blade Fold Kits 2 - Seat Pallets 1 - Multi-Function Operator Seat (MFOS) 2 - Signal Data Converter (SDC) 1 - Total: Other - Total Advance Procurement/Obligation Authority - Description: FY 2025 Advance Procurement was the last request for the Multi-Year X contract. LI 6771AA0005 - UH-60 Blackhawk M Model (MYP) Army UNCLASSIFIED Page 4 of 4 P-1 Line #11 Volume 1 - 55 === page 92 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 6775A05101 / CH-47 Helicopter Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 20: Rotary Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0607137A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2027 Base FY 2027 OOC FY 2027 Total FY 2026 207 11 11 5 - 5 1 1 1 Gross/Weapon System Cost ($ in Millions) 6,390.491 718.634 628.798 272.066 - 272.066 87.822 89.120 88.113 Less PY Advance Procurement ($ in Millions) 756.117 18.936 61.421 - 61.421 - - - 5,634.374 699.698 210.645 - 210.645 87.822 89.120 88.113 - - - 87.822 89.120 88.113 Procurement Quantity (Units in Each) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 775.053 6,409.427 699.698 628.798 61.421 690.219 - - 210.645 FY 2028 - - 210.645 FY 2029 To FY 2031 Complete FY 2025 FY 2030 1 Total Continuing Continuing 55.322 Continuing Continuing - Continuing Continuing 55.322 Continuing Continuing - Continuing Continuing 55.322 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 30,871.937 65,330.364 57,163.455 54,413.200 - 54,413.200 87,822.000 89,120.000 88,113.000 55,322.000 Continuing Continuing Description: The CH-47F Chinook, the Army's only heavy lift helicopter, is critical to achieving the heavy lift capability in support of Transformation in Contact (TiC) and Continuous Transformation objectives. The CH-47F Block II provides additional capability to the field with increased payload, extended reach, improved sustainability, and an increased maximum gross weight to 54,000 pounds. The CH-47F is a critical component of the Aviation Campaign objective of Modernization, Equipping, and Sustaining the Army aviation portfolio. The Chinook fleet has multiple missions: transporting troops (air assault); supply and resupply weapons and equipment; Casualty Evacuation (CASEVAC) and performing other cargo operations. The Chinook operates in support roles throughout the theater in combat. Secondary missions include aircraft recovery, parachute drops, disaster relief, and search and rescue. The CH-47F is vital to our nation's Overseas Contingency Operations and Homeland Security needs. The Army fields these aircraft to heavy lift companies within Combat Aviation Brigades (CAB) and Special Operations Aviation units. The Army currently expects the CH-47F and MH-47G aircraft to remain the Army's lone heavy lift helicopter for the next several decades. The CH-47F Digital Cockpit Support & Sustainment (DCSS) funding maintains aircraft readiness by procuring the necessary hardware, software, and services to address several key areas. This funding manages aircraft obsolescence, integrates needed technology insertions and improvements, and supports solutions from common equipment providers. These solutions include Assured Positioning, Navigation, and Timing (APNT), crypto modernization, and enhanced and integrated Aircraft Survivability Equipment (ASE). The funding also advances the "Approach to X" autopilot capability towards greater autonomy and strengthens cybersecurity measures. The CH-47F Block II program upgrades existing CH-47F aircraft and procures common hardware for the CH-47F and MH-47G. The CH-47F Block II upgrades include strengthened airframe modifications, improved fuel, electrical, rotor, and drive system updates. The program also updates the Common Avionics Architecture System and Digital Advanced flight Control System and addresses avionics obsolescence by incorporating avionics upgrades introduced in the final CH-47F production aircraft. The Army initiated the CH-47F Block II Middle Tier Acquisition Rapid Fielding (MTA RF) on 12 September 2025 for completion in 2030. Through the RF pathway, the project office will field up to 24 aircraft to include the necessary logistics support and training equipment to two CABs. This Budget Line Item (BLI) utilized FY 2025 $465.231 million and FY 2026 $425.439 million in APA for the CH-47F Block II MTA RF requirement. H-47 Block II Renew and New Build programs rebuild or replace 69 MH-47G Special Operations Aircraft and 24 CH-47F aircraft to the Block II configuration. PM Cargo procurement funding lines provided are for the Army common component portion for the MH-47G. The modernization Product Office, in conjunction with Technology Applications Program Office (TAPO), is replacing the aging fleet of MH-47G aircraft that has airframe components dating back more than 45 years. The MH-47G program, while complementary to the CH-47F Block II program, is separately managed by the TAPO Army Special Operations Aviation Command (ARSOAC) program with a stand-alone Acquisition Strategy. The approved Army Acquisition Objective (AAO) is 501 aircraft (432 CH-47F/69 MH-47G). LI 6775A05101 - CH-47 Helicopter Army UNCLASSIFIED Page 1 of 13 P-1 Line #12 Volume 1 - 56 === page 93 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 6775A05101 / CH-47 Helicopter Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 20: Rotary Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0607137A Line Item MDAP/MAIS Code: N/A Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 6775A05101 - CH-47 Helicopter Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 11 11 5 - 5 1 1 1 1 699.698 690.219 210.645 - 210.645 87.822 89.120 88.113 55.322 11 11 5 - 5 1 1 1 1 699.698 690.219 210.645 - 210.645 87.822 89.120 88.113 55.322 UNCLASSIFIED Page 2 of 13 P-1 Line #12 Volume 1 - 57 === page 94 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 6775A05101 / CH-47 Helicopter Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 20: Rotary Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0607137A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 A05105 / CH-47 SLEP P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 207 / 6,390.491 11 / 718.634 11 / 628.798 5 / 272.066 - / - 5 / 272.066 207 / 6,390.491 11 / 718.634 11 / 628.798 5 / 272.066 - / - 5 / 272.066 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Procurement dollars in the amount of $193,954 million support the Army common material for five (5) MH-47G. FY 2027 Procurement dollars in the amount of $16,691 million supports the CH-47F Digital Cockpit Support & Sustainment. FY 2026 to FY 2027 decrease is due to the Army's shift in priorities. In accordance with section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110 - 181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 6775A05101 - CH-47 Helicopter Army UNCLASSIFIED Page 3 of 13 P-1 Line #12 Volume 1 - 58 === page 95 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6775A05101 / CH-47 Helicopter Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: A05105 / CH-47 SLEP MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2026 FY 2027 OOC FY 2027 Total 11 5 - 5 6,390.491 718.634 628.798 272.066 - 272.066 61.421 - 61.421 210.645 - 210.645 756.117 18.936 5,634.374 699.698 Plus CY Advance Procurement ($ in Millions) 775.053 Total Obligation Authority ($ in Millions) FY 2027 Base 11 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2025 207 628.798 - 6,409.427 61.421 699.698 - 690.219 - 210.645 - - 210.645 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 30,871.937 - 65,330.364 - 57,163.455 - 54,413.200 - - 54,413.200 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements FY 2025 FY 2026 Unit Cost 41 1,026.295 39,065.800 - - 18.936 - - 18.936 - - - - - - - Unit Cost ($ K) Qty (Each) ($ M) ($ K) Qty (Each) Total Cost Unit Cost 195.329 34,252.800 FY 2027 Base Total Cost ($ M) ($ K) Qty (Each) Total Cost Unit Cost 171.264 38,790.800 ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost MH-47G Block I to Block II Army (†) Common Funding MH-47G Block II Army Common Funding Advanced Procurement MH-47G Block II Retrofits CH-47 Block II CFE 25,031.585 16,809.875 8 5 5 5 193.954 - - - 38,790.800 5 - - - - - - 193.954 - 71.770 - - - - - - - - - - - - - - - 134.479 - - - - - - - - 61.421 - - - - - 61.421 CH-47 Block II GFE - - 19.533 - - 29.000 - - 28.691 - - - - - - - - - CH-47 Block II Initial Spares - - 1.916 - - 41.422 - - 4.461 - - - - - - - - - CH-47 Block II Other Costs - - 5.772 - - 8.365 - - 4.528 - - - - - - - - - Block II Software Support - - - - - 12.298 - - 1.898 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - CH-47D to CH-47F Conversion Subtotal: Recurring Cost 28,909.695 154 4,452.093 - - - - 5,730.794 - - 305.350 - - 210.842 - - - - 0.500 - - 7.638 - - 5.147 - - 255.375 255.375 Non Recurring Cost CH-47 Block II Support Equipment LI 6775A05101 - CH-47 Helicopter Army UNCLASSIFIED Page 4 of 13 - P-1 Line #12 - Volume 1 - 59 === page 96 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6775A05101 / CH-47 Helicopter Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: A05105 / CH-47 SLEP MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) Qty (Each) Unit Cost ($ M) CH-47 Block II NRE - - Subtotal: Non Recurring Cost - Subtotal: Flyaway Cost FY 2025 Total Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) 1.100 - - - 1.600 - - 5,732.394 - ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) 4.396 - - - 12.034 - - 317.384 - ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) 7.260 - - - 12.407 - - - 223.249 - - 329.585 - - ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - - - - - - - - - - - - - - - - - - - - - - - 255.375 255.375 Hardware Cost Non Recurring Cost (†) CH-47 Block II 54,181.000 8 433.448 52,598.167 6 315.589 54,930.833 6 CH-47 Avionics (Advanced Procurement) - - 43.400 - - - - - - - - - - - - - - - CH-47 Airframe (Advanced Procurement) - - 65.100 - - - - - - - - - - - - - - - CH47F Block II Logistics - - 44.450 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 586.398 - - 315.589 - - 329.585 - - - - - - - - - - - 586.398 - - 315.589 - - 329.585 - - - - - - - - - CH-47F Digital Block I Cockpit Support & Sustainment - - 35.358 - - 39.138 - - 32.095 - - 16.691 - - - - - 16.691 CH-47F Cockpit Software Support - - 22.141 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 57.499 - - 39.138 - - 32.095 - - 16.691 - - - - - 16.691 - - 57.499 - - 39.138 - - 32.095 - - 16.691 - - - - - 16.691 Contractor Management - - 14.200 - - 46.523 - - 41.544 - - - - - - - - - Subtotal: Support - Program Management Cost - - 14.200 - - 46.523 - - 41.544 - - - - - - - - - Subtotal: Hardware Cost Software Cost Non Recurring Cost Subtotal: Software Cost Support - Program Management Cost Support - System Test and Evaluation Cost Test and Evaluation Support - - - - - - - - 2.325 - - - - - - - - - Subtotal: Support - System Test and Evaluation Cost - - - - - - - - 2.325 - - - - - - - - - 11 628.798 - - - Gross/Weapon System Cost 30,871.937 207 LI 6775A05101 - CH-47 Helicopter Army 6,390.491 65,330.364 11 718.634 57,163.455 UNCLASSIFIED Page 5 of 13 54,413.200 5 272.066 P-1 Line #12 54,413.200 5 272.066 Volume 1 - 60 === page 97 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 P-1 Line Item Number / Title: 6775A05101 / CH-47 Helicopter ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: A05105 / CH-47 SLEP MDAP/MAIS Code: Remarks: The production line for Chinook combines three separate products: CH-47F Block II production, MH-47G Block II (common production funding including retrofits and advanced procurement), and CH47F Digital Cockpit Support and Sustainment (base procurement). The Gross Weapon System Cost cannot be calculated by dividing quantities by the total of these lines. CH-47F: The CH-47F Digital Cockpit Support & Sustainment (DCSS) funding maintains aircraft readiness by procuring necessary hardware, software and services to address aircraft obsolescence, needed technology insertions and improvements, integration of common equipment provider solutions including crypto modernization, Assured Positioning Navigation Timing (APNT), enhanced and integrated Aircraft Survivability Equipment (ASE), and cyber security. The DCSS funding focuses on critical capabilities and operational readiness across all COMPOs. The funding ensures the safety and relevancy of the aircraft, crew and mission in all combat operational environments. MH-47G Block II: MH-47G Block II procurement quantities reduced from 6 per year to 4 per year for FY2023 and from 6 per year to 5 per year in FY2024 -FY2026 and 5 per year in FY2027. The quantity changes are due to increased production costs resulting from post-COVID production impacts, ongoing global supply chain uncertainties, and recent increases in contractor labor rates. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total 11 11 5 - 5 699.698 690.219 210.645 - 210.645 11 11 5 - 5 699.698 690.219 210.645 - 210.645 indicates the presence of a P-5a LI 6775A05101 - CH-47 Helicopter Army UNCLASSIFIED Page 6 of 13 P-1 Line #12 Volume 1 - 61 === page 98 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 FY Contractor and Location MH-47G Block I to Block II Army Common Funding 2023 Boeing / Philadelphia PA SS / FFP Fort Eustis Dec 2023 Dec 2025 4 28,665.000 Y MH-47G Block I to Block II Army Common Funding 2024 Boeing / Philadelphia PA SS / FFP Fort Eustis Mar 2024 Jun 2026 5 28,975.000 Y 2025 Boeing / Philadelphia PA SS / FFP Fort Eustis Jan 2025 Aug 2027 5 39,065.800 Y 2026 Boeing / Philadelphia PA SS / FFP Fort Eustis Jun 2026 Aug 2029 5 34,252.800 Y 2027 Boeing / Philadelphia PA SS / FFP Fort Eustis Mar 2027 Aug 2030 5 38,790.800 Y CH-47 Block II 2022 Boeing / Philadelphia PA SS / FPIF Redstone Arsenal AL Sep 2022 Mar 2025 2 44,314.500 Y Aug 2022 CH-47 Block II 2023 Boeing / Philadelphia PA SS / FFP Redstone Arsenal, AL Nov 2024 Sep 2025 3 45,214.800 Y Apr 2024 CH-47 Block II 2024 Boeing / Philadelphia PA SS / FFP Redstone Arsenal, AL Sep 2025 May 2028 3 45,390.600 Y Jul 2024 CH-47 Block II 2025 Boeing / Philadelphia PA SS / FFP Redstone Arsenal, AL Sep 2025 Apr 2029 6 52,598.167 Y Jul 2025 CH-47 Block II 2026 Boeing / Philadelphia PA SS / FFP Redstone Arsenal, AL Apr 2026 Oct 2029 6 54,930.833 Y Jul 2025 MH-47G Block I to Block II Army (†) Common Funding MH-47G Block I to Block II Army (†) Common Funding MH-47G Block I to Block II Army (†) Common Funding (†) Item Number / Title [DODIC]: A05105 / CH-47 SLEP Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 6775A05101 / CH-47 Helicopter Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 6775A05101 - CH-47 Helicopter Army UNCLASSIFIED Page 7 of 13 P-1 Line #12 Volume 1 - 62 === page 99 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6775A05101 / CH-47 Helicopter Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: A05105 / CH-47 SLEP Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Fiscal Year 2023 Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E MH-47G Block I to Block II Army Common Funding Prior Years Deliveries: 32 1 2025 ARMY 5 0 5 5 1 2026 ARMY 5 0 5 5 1 2027 ARMY 5 0 5 5 O C T LI 6775A05101 - CH-47 Helicopter Army N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #12 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 63 === page 100 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6775A05101 / CH-47 Helicopter Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: A05105 / CH-47 SLEP Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P MH-47G Block I to Block II Army Common Funding Prior Years Deliveries: 32 1 2025 ARMY 5 0 5 1 2026 ARMY 5 0 5 1 2027 ARMY 5 0 5 A - - - - - - - - 5 5 5 O C T LI 6775A05101 - CH-47 Helicopter Army - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #12 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 64 === page 101 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6775A05101 / CH-47 Helicopter Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: A05105 / CH-47 SLEP Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P MH-47G Block I to Block II Army Common Funding Prior Years Deliveries: 32 1 2025 ARMY 5 0 5 1 2026 ARMY 5 0 5 1 2027 ARMY 5 0 5 - O C T LI 6775A05101 - CH-47 Helicopter Army - N O V - D E C - J A N - F E B - M A R - A P R - M A Y - - - - - - - - - - - - - - - 4 A - - - - - - - - - - - - - - - - 5 A - - - - - - - 5 J U N J U L A U G UNCLASSIFIED Page 10 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #12 M A R A P R M A Y J U N J U L 1 A U G S E P Volume 1 - 65 === page 102 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6775A05101 / CH-47 Helicopter Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: A05105 / CH-47 SLEP Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P MH-47G Block I to Block II Army Common Funding Prior Years Deliveries: 32 1 2025 ARMY 5 1 4 - - - - - - - - - - - - 1 2026 ARMY 5 0 5 - - - - - - - - - - - - - - - - - - - - - - 1 2027 ARMY 5 0 5 - - - - - - - - - - - - - - - - - - - - - - O C T LI 6775A05101 - CH-47 Helicopter Army N O V 1 D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 13 S E P O C T 1 N O V - D E C 1 J A N - F E B P-1 Line #12 1 M A R 0 A P R M A Y J U N J U L 1 A U G - 4 - 5 S E P Volume 1 - 66 === page 103 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6775A05101 / CH-47 Helicopter Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: A05105 / CH-47 SLEP Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E MH-47G Block I to Block II Army Common Funding Prior Years Deliveries: 32 1 2025 ARMY 5 5 0 1 2026 ARMY 5 1 4 1 2027 ARMY 5 0 5 0 1 O C T LI 6775A05101 - CH-47 Helicopter Army - 1 N O V - D E C 1 J A N - F E B 1 M A R 0 A P R M A Y J U N J U L 1 A U G UNCLASSIFIED Page 12 of 13 S E P 1 O C T N O V 1 D E C J A N 1 F E B P-1 Line #12 M A R 1 A P R 0 M A Y J U N J U L A U G S E P Volume 1 - 67 === page 104 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 6775A05101 / CH-47 Helicopter Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 Item Number / Title [DODIC]: A05105 / CH-47 SLEP Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 ALT Prior to Oct 1 1 Boeing - Philadelphia PA 18 18 36 11 ALT After Oct 1 Reorder Manufacturing PLT 10 25 Total After Oct 1 ALT Prior to Oct 1 35 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 Remarks: Note: FMS compensates for Minimum Sustainment Rate (MSR). Procurement funding and production schedules currently support the Army common portion of funding to rebuild or replace MH-47G Special Operations Aircraft and the CH-47F Block II. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 6775A05101 - CH-47 Helicopter Army UNCLASSIFIED Page 13 of 13 P-1 Line #12 Volume 1 - 68 0 === page 105 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 20: Rotary P-1 Line Item Number / Title: 6775A05101 / CH-47 Helicopter Program Elements for Code B Items: N/A Other Related Program Elements: 0607137A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Gross/Weapon System Cost ($ in Millions) 775.053 - 61.421 - - - - - - - Continuing Continuing Net Procurement (P-1) ($ in Millions) 775.053 - 61.421 - - - - - - - Continuing Continuing Total Obligation Authority ($ in Millions) 775.053 - 61.421 - - - - - - - Continuing Continuing Description: The CH-47F Block II program upgrades existing CH-47F aircraft and procures common hardware for the CH-47F and MH-47G. The CH-47F Block II upgrades include strengthened airframe modifications, improved fuel, electrical, rotor, and drive system updates. The program also updates the Common Avionics Architecture System and Digital Advanced flight Control System and addresses avionics obsolescence by incorporating avionics upgrades introduced in the final CH-47F production aircraft. The Army initiated the CH-47F Block II Middle Tier Acquisition Rapid Fielding (MTA RF) on 12 September 2025 for completion in 2030. Through the RF pathway, the product office will field up to 24 aircraft to include the necessary logistics support and training equipment to two CABs. This Budget Line Item (BLI) utilized FY2025 $465.231 million and FY2026 $425.439 million in APA for the CH-47F Block II MTA RF requirement. LI 6775A05101 - CH-47 Helicopter Army UNCLASSIFIED Page 1 of 4 P-1 Line #13 Volume 1 - 69 === page 106 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 20: Rotary P-1 Line Item Number / Title: 6775A05101 / CH-47 Helicopter Program Elements for Code B Items: N/A Other Related Program Elements: 0607137A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-10 A05105 / CH-47 SLEP 207 / 775.053 11 / - 11 / 61.421 5/ - - / - 5/ - P-40 Total Gross/Weapon System Cost 207 / 775.053 11 / - 11 / 61.421 5/ - - / - 5/ - *Title represents the P-10 Title for Advance Procurement. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: LI 6775A05101 - CH-47 Helicopter Army UNCLASSIFIED Page 2 of 4 P-1 Line #13 Volume 1 - 70 === page 107 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Army P-1 Line Item Number / Title: 6775A05101 / CH-47 Helicopter Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 First System (2027) Award Date: December 2003 First System (2027) Completion Date: December 2006 CH-47 SLEP Production Leadtime P-5 Number / Title: A05105 / CH-47 SLEP Interval Between Systems: 2 Months Prior Years (Months) FY 2025 (Each) 207 When Required Prior Years (Months) FY 2026 (Each) Quantity Cost Elements Date: April 2026 11 FY 2025 ($ M) FY 2027 (Each) (Each) 11 FY 2026 ($ M) 5 FY 2027 ($ M) ($ M) CFE MH-47 Avionics 16 322.507 - 7.768 - MH-47 Airframe 14 424.546 - 11.653 - CH-47 Avionics - 11.200 - 16.800 - CH-47 Airframe - 16.800 - 25.200 - Total: CFE 775.053 - 61.421 - Total Advance Procurement/Obligation Authority 775.053 - 61.421 - LI 6775A05101 - CH-47 Helicopter Army UNCLASSIFIED Page 3 of 4 P-1 Line #13 Volume 1 - 71 === page 108 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 01 / 20 P-1 Line Item Number / Title: 6775A05101 / CH-47 Helicopter Date: April 2026 P-5 Number / Title: A05105 / CH-47 SLEP FY 2027 Cost Elements Production Leadtime QPA (Months) (Each) Unit Cost ($ K) Contract Forecast Date 2027 Qty (Each) For FY Total Cost Request ($ M) CFE MH-47 Avionics 1 - MH-47 Airframe 1 - CH-47 Avionics - - CH-47 Airframe - - Total: CFE - Total Advance Procurement/Obligation Authority - Description: N/A LI 6775A05101 - CH-47 Helicopter Army UNCLASSIFIED Page 4 of 4 P-1 Line #13 Volume 1 - 72 === page 109 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 9990A19900 / Spectrum Army SUAS Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 01: Aircraft / BSA 20: Rotary Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 457.858 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 457.858 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 457.858 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 1.824 - - - - - - - - - - - - - - - - - - - 1.824 - - - - - - - - - - - - - - - - - - - 1.824 - - - - - - - - - Total 459.682 459.682 459.682 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Spectrum funding is not included the AVN PB request, it is requested by the Spectrum office. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 1.824 - - - - - - - - - - - - - - - - - 1.824 - - - - - - - - Justification: Spectrum funding is not included the AVN PB request, it is requested by the Spectrum office. LI 9990A19900 - Spectrum Army SUAS Army UNCLASSIFIED Page 1 of 1 P-1 Line #14 Volume 1 - 73 === page 110 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 0023A01001 / MQ-1 PAYLOAD Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 334.707 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 334.707 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 334.707 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 14.086 - 53.190 - 53.190 54.560 54.895 54.841 - - - - - - - - 14.086 - 53.190 - 53.190 54.560 54.895 54.841 - - - - - - - - 14.086 - 53.190 - 53.190 54.560 54.895 54.841 To FY 2031 Complete - Total - 55.388 Continuing - Continuing - 55.388 Continuing - Continuing - - 55.388 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The MQ-1 Payload (MIP) budget line supports procurement of Aerial Intelligence, Surveillance and Reconnaissance (A-ISR) payload systems for Divisions and Echelons Above Division Unmanned Aircraft Systems (UAS). Funding in this budget line supports a Sensor Centric approach for sensors onboard the Gray Eagle MQ-1C UAS, high-altitude platforms (including Micro High-Altitude Balloons (mHAB)), medium altitude manned systems, and unmanned stratospheric A-ISR systems.. Funding in this budget line also supports, but is not limited to, emerging UAS sensor requirements such as Electro Optic/Infrared/ Laser Designator (EO/IR/LD), Signals Intelligence (SIGINT), Hyper Spectral Imagery (HSI), and Synthetic Aperture Radar (SAR). The Common Sensor Payload (CSP) is an EO/IR/LD sensor that provides an advanced state-of-the-art sensor suite that can be used to collect critical information across the visible and infrared portions of the electromagnetic spectrum for Battlefield Commanders. The CSP is required for MQ-1C Gray Eagle (GE) Unmanned Aircraft System (UAS) operation and serves as the "eyes" of the UAS by providing highdefinition imagery in day or night conditions for detection and classification of targets/threats. The CSP also provides a targeting capability for laser-guided munitions, to include air-to-ground AGM-114 Hellfire missiles. The Target Location Accuracy (TLA) capability inherent to CSP Version 3 (v3) enables precision, near-real time engagements with Coordinate Seeking Weapons (CSWs) by reducing the sensor-toshooter process from minutes to seconds. Electronics Intelligence (ELINT) and Electronic Support Measures (ESM) capabilities provide high precision direction finding and geolocation with 360-degree instantaneous field of view coverage from the nose, tail, port, and starboard sides of the UAS. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 0023A01001 - MQ-1 PAYLOAD Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 14.086 - 53.190 - 53.190 54.560 54.895 54.841 55.388 - - - - - - - - - 14.086 - 53.190 - 53.190 54.560 54.895 54.841 55.388 UNCLASSIFIED Page 1 of 3 P-1 Line #15 Volume 1 - 74 === page 111 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 0023A01001 / MQ-1 PAYLOAD Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a A01005 / CSP FMV 25 / 334.707 7 / 14.086 - / - 7 / 53.190 - / - 7 / 53.190 P-40 Total Gross/Weapon System Cost - - - / - - - / - - / 334.707 / 14.086 / 53.190 / 53.190 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding for Common Sensor Payload (CSP) is $53.190 million. See classified quad chart for more information. In accordance with section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110 - 181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 0023A01001 - MQ-1 PAYLOAD Army UNCLASSIFIED Page 2 of 3 P-1 Line #15 Volume 1 - 75 === page 112 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Army P-1 Line Item Number / Title: 0023A01001 / MQ-1 PAYLOAD Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 Prior Years MDAP/ Item Number / Title [DODIC] A01005 / CSP FMV ID CD MAIS Code Unit Cost ($ K) 13,388.280 FY 2025 Total Cost Qty (Each) Unit Cost ($ M) 25 ($ K) 334.707 (Each) 2,012.286 FY 2026 Total Cost Qty Aggregated Items Title: A01005 / CSP FMV ($ M) 7 14.086 7 14.086 Unit Cost ($ K) - Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ K) - - - - - - Qty (Each) 7,598.571 FY 2027 OOC Total Cost ($ M) 7 53.190 7 53.190 Unit Cost ($ K) - Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ K) - - - - - - Total Cost Qty (Each) 7,598.571 ($ M) 7 53.190 7 53.190 Secondary Distribution Army Total - - 334.707 - - Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. LI 0023A01001 - MQ-1 PAYLOAD Army 14.086 - UNCLASSIFIED Page 3 of 3 - - 53.190 P-1 Line #15 - - - 53.190 Volume 1 - 76 === page 113 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 0756AA6601 / Gray Eagle Mods2 Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0305219A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 635.099 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 635.099 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 635.099 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 23.865 12.351 2.556 - 2.556 4.533 4.637 4.637 - - - - - - - - 23.865 12.351 2.556 - 2.556 4.533 4.637 4.637 - - - - - - - - 23.865 12.351 2.556 - 2.556 4.533 4.637 4.637 To FY 2031 Complete - Total - 4.683 Continuing - Continuing - 4.683 Continuing - Continuing - - 4.683 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The MQ-1C Gray Eagle provides the Army with an Extended Range, Multi-Purpose (ERMP) Uncrewed Aircraft System (UAS) in Multi-Domain Operations (MDO); capable of executing reconnaissance, security, attack, and intelligence collection missions in Range of Military Operations (ROMO). Sensors/Payloads include an Electro-Optical/Infrared/Laser Designator (EO/IR/LD), Synthetic Aperture Radar/Moving Target Indicator (SAR/MTI), Signals Intelligence (SIGINT), and HELLFIRE missiles providing long range, deep sense/attack with standoff. The MQ-1C Gray Eagle Modification/Product Improvement Program (PIP) funding is required to address obsolescence while maintaining a MDO-ready capability. This effort involves the procurement of expeditionary ground equipment (control stations), datalinks (new single/multi-band satellite communication & line of sight terminals), avionics (increased processing power, M-Code navigators), payloads, and aircraft systems (Modernized Extended Range) in a Modular Open System Architecture (MOSA) supported by partitioned flight/mission software. Funding supports multi-phased integration efforts of hardware and software procurement in support of Army Assured-Positioning Navigation and Timing (A-PNT) requirements to allow the MQ-1C Gray Eagle to survive, persist, and operate effectively in GPS denied environments resulting in the fielding of M-Code navigators as required by Public Law 111-383. Procurement of new engine propulsion systems is necessary to maintain operational readiness for the enduring MQ-1C Gray Eagle fleet and provides the -25M Weapon Systems with a viable propulsion system. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing defense support to civil authorities. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 23.865 12.351 2.556 - 2.556 4.533 4.637 4.637 4.683 - - - - - - - - - 23.865 12.351 2.556 - 2.556 4.533 4.637 4.637 4.683 Justification: LI 0756AA6601 - Gray Eagle Mods2 Army UNCLASSIFIED Page 1 of 2 P-1 Line #16 Volume 1 - 77 === page 114 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 0756AA6601 / Gray Eagle Mods2 Program Elements for Code B Items: N/A Other Related Program Elements: 0305219A Line Item MDAP/MAIS Code: N/A FY 2027 Procurement dollars supports the procurement of hardware components to support A-PNT kits for Vision Based Navigation (VBN). This critical technology provides a GPS-independent navigation capability, using video imagery to allow the aircraft to continue its vital reconnaissance, intelligence, and surveillance missions during GPS denial or disruption. Funding VBN is a necessary investment to increase the probability of mission success and enhance the survivability of this key asset in contested environments. FY 2026 to FY 2027 funding decrease is due to the shift in Army priorities. LI 0756AA6601 - Gray Eagle Mods2 Army UNCLASSIFIED Page 2 of 2 P-1 Line #16 Volume 1 - 78 === page 115 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 9,505.674 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 93.826 180.439 - 9,325.235 93.826 180.439 - 9,505.674 93.826 131.236 251.645 - - - 131.236 - 251.645 - - - - 131.236 251.645 251.645 - 251.645 - - 251.645 265.581 265.547 - 265.637 - 265.547 265.637 - 265.547 Continuing 265.637 Continuing Continuing - 265.548 Total - - 265.548 - 265.581 - 265.548 - 265.581 To FY 2031 Complete 180.439 Continuing - 180.439 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The AH-64E is the premier attack helicopter of the Army's current and future force. The AH-64E is the Army's only attack aviation platform delivering critical attack, reconnaissance, close air support, and deep strike capability supporting large scale combat operations and delivering transformation in contact. AA6605 AH-64 MODS is the only means to maintain and operate the Apache fielded fleet. The AH-64 MODS Program allows for near-term operationally driven improvements to the Apache fleet, focusing on deployment lessons learned, and reliability improvements. AA6605 AH-64 MODS funding will be utilized for V6.5 hardware/software procurement, fielding and new equipment training to bring all E model aircraft to common baseline. V6.5 fielding will also require operator and maintainer devices, and courseware in the V6.5 configuration; Ongoing aviation survivability improvement blade paint activities for composite main rotor blades and touch up requirements; contractor logistics services funding required to ensure Spike NonLine Of Sight can be maintained in the field; Consolidated warehouse supporting warehouse space and inventory management; Smart Tool for Aviation Maintenance Picture (STAMP) logistics support; and Fielding requirement for the new Oil Cooled Generator (OCG) will provide increased reliability and alleviation of safety issues. Fielding Requirement for Improved Tail Rotor Blades will provide increased damage tolerance, structural confidence, and increased thrust capability. Maintainer Training Device provides updates, training support and courseware development to ensure proper maintainer proficiency. Longbow Crew Trainer (LCT) obsolescence mitigation and maintenance provides continual obsolescence, maintenance, and tech support to ensure LCT operability of current fleet. LCT V6.5 updates and obsolescence refresh upgrades are required to ensure training equipment concurrency through V6.5 fielding. These modernization efforts are required to ensure the Apache remains a ready and relevant Warfighter weapon system. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 2706AA6605 - AH-64 MODS Army FY 2025 FY 2027 Base FY 2026 - 93.826 93.826 131.236 131.236 FY 2027 OOC - 251.645 251.645 UNCLASSIFIED Page 1 of 27 FY 2027 Total - FY 2028 - FY 2029 - 251.645 265.581 - - 251.645 265.581 P-1 Line #17 FY 2030 - 265.547 265.547 FY 2031 - - 265.548 - 265.637 - 265.548 265.637 Volume 1 - 79 === page 116 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a AA6606 / AH-64 APACHE MODS (Operational & Reliability Improvements and Resolve Obsolescence Issues) - / 9,505.674 - / 93.826 - / 131.236 - / 251.645 - / - - P-40 Total Gross/Weapon System Cost - / 9,505.674 - / 93.826 - / 131.236 - / 251.645 - / - - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code / 251.645 / 251.645 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Continuing Continuing Continuing Continuing P-3a AA6606 / AH-64 APACHE MODS (Operational & Reliability Improvements and Resolve Obsolescence Issues) - / 265.581 - / 265.547 - / 265.548 - / 265.637 P-40 Total Gross/Weapon System Cost - / 265.581 - / 265.547 - / 265.548 - / 265.637 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 procurement dollars supports modifications and service life extension efforts for the Aircraft Software, Airframe, Communications, Contractor Logistics Support (CLS), Drive Systems, Integrated Logistics Support (ILS), Peculiar Support Equipment, Sensors, Systems Engineering & Program Management, Systems Test & Evaluation, and Training Systems. FY 2026 to FY 2027 funding amounts were increased due to prioritization and leadership decisions to address the following AH-64E operational and maintainability issues: Improved Tail Rotor Blade (ITRB) development. The current Apache (AAH) tail rotor metal blade has multiple reliability issues that prohibit the blade from reaching its design life of 6404 hours. The ITRB qualification objective is to design, test, integrate and produce a structurally qualified blade that provides greater damage tolerance and performance compared to the existing metallic tail rotor blade. Additional benefits include improved producibility, improved damage inspection/repair criteria, erosion protection, and maintainability and reliability enhancements over that of the legacy design to meet the AH-64E (AVNSPRF-10750) system specification requirements. The function of the Tail Rotor Drive System is to transfer torque from the Main Transmission to the Tail Rotor Gearbox while accommodating structural deflections of the tail-boom. The current legacy Apache drive system is not structurally adequate to support increased thrust capability and additional torque required by the ITRB without being pitch-limited. Improved Tail Rotor Drive System (ITRDS) as an upgraded subsystem of the AH-64E platform is a key component to structurally accounting for full thrust capability from the ITRB along with increased power from integration of future T-901 engines. The ITRDS will also maximize component time on wing and component mean time between removals, while reducing maintenance when compared to continued use of the existing legacy aircraft tail rotor drive system components. Funding for the ITRDS supports a comprehensive upgrade to the tail rotor drive system and potential airframe reinforcement to fully utilize the ITRB, maintain a safe directional control margin, and maximize the aircraft's combat effectiveness. Development of a new AAH Oil Cooled Generator (OCG) addresses the current air-cooled generator which has experienced reliability issues over the last two decades. There have been numerous on-wing generator failures resulting in both partial and complete power loss along with instances of smoke infiltrating the cockpit. As the directed OCG material solution, AA6605 MODS supports a significant increase in reliability, reduce failures in the field, and alleviates safety concerns posed by the current air-cooled generator failures. Coyote Modem fielding supports the execution of modification work orders to install current inventory of Coyote Modems to newly upgraded V6.5 AH-64E fielded aircraft. As part of the Manned/Unmanned Teaming-eXpanded (MUMT-X) surveillance and threat detection capabilities of the AH-64E, the Coyote Modem addresses near-term communications security obsolescence with the current Rover-6 modems LI 2706AA6605 - AH-64 MODS Army UNCLASSIFIED Page 2 of 27 P-1 Line #17 Volume 1 - 80 === page 117 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A while also achieving size, weight, and power savings, reduced battery maintenance and modernized common data link requirements needed to ensure continued support of Counter Uncrewed Aircraft Systems (CUAS) and Launched Effects (LE) missions. Longbow Crew Trainer (LCT) efforts provide concurrency to Maintainer Training Devices, Training Services and Courseware Development. This effort procures training material, courseware, and training devices to ensure proper maintainer proficiency. LCT obsolescence mitigation and maintenance ensures LCT operability of current fleet. Upgrades are required to ensure training equipment concurrency through V6.5 fielding. Spike Non-Line of Sight (NLOS) Contractor Logistics Support (CLS) funding ensures that the Spike system can be maintained in the field. Without CLS, Spike NLOS units will eventually become inoperable due to parts obsolescence and lack of Contractor Field Service Representative (CFSR) support. V6.5 fielding kits consist of V6.5 hardware and software procurement and fielding to bring all AH-64E model aircraft to a common baseline and will increase capability and commonality, positively affecting maintenance, training, and lethality. LI 2706AA6605 - AH-64 MODS Army UNCLASSIFIED Page 3 of 27 P-1 Line #17 Volume 1 - 81 === page 118 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: AA6606 / AH-64 APACHE MODS MDAP/MAIS Code: Prior Years 9,505.674 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 93.826 180.439 - 9,325.235 93.826 180.439 - 9,505.674 93.826 131.236 131.236 131.236 251.645 - - 251.645 - - 251.645 - 251.645 265.581 251.645 265.581 251.645 265.581 265.547 265.547 265.547 265.548 265.548 265.548 To FY 2031 Complete 265.637 Continuing 265.637 Continuing Continuing 265.637 Total - 180.439 Continuing - 180.439 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Aircraft Software includes V6.5 hardware and software procurement and fielding to bring all AH-64E model aircraft to common baseline. This will increase capability and commonality, positively affecting maintenance, training, and lethality. Airframe includes ongoing Apache Survivability Product Improvement (ASPI) paint activities for the Composite Main Rotor Blade (CMRB). Communications include the sustainment and upgrades of communication systems required to maintain appropriate levels of MIL-STD and system requirements in support of the AH-64E Apache platform. Contractor Logistics Support (CLS) includes activities to ensure Spike Non-Line of Sight (NLOS) systems can be maintained in the field. Drives include the design, procurement and integration of all systems, mechanical and other, used to provide mechanical power to the main transmission and subsequent drivetrain components. AH-64 MODS supports the procurement for initial production, spares, and upgrades in support of the AH-64E Apache platform. Electrical Subsystem modifications support the fielding requirement for the new Oil Cooled Generator (OCG) that will alleviate safety and reliability issues with current air cooled generator. Integrated Logistics Support (ILS) is the storage and transportation of hardware. This includes warehouse support efforts to ensure the availability of storage space and inventory management; packing, unpacking, shipping, receiving and limited depopulation and repair of crash damaged assets. Additionally, this includes the effort to ensure the transportation of V6.5 hardware from units to original equipment manufacturers for upgrades. Peculiar Support Equipment includes the sustainment of the Smart Tool for Aviation Maintenance Picture (STAMP) system software and Authority to Operate. Rotor modifications support the fielding requirement for the Improved Tail Rotor Blades (ITRB). ITRBs will provide increased damage tolerance, structural confidence, and increased thrust capability for the AH-64E Apache aircraft. Sensors include modifications, operational improvements, obsolescence, and/or mitigation of capability issues to the Apache Sensors suite, which includes: the TADS/PNVS, Fire Control Radar (FCR), Manned/ Unmanned Teaming - eXpanded (MUMT-X) and the Generation 2 Radar Frequency Interferometer (G2RFI), providing for the necessary sensing, protection and survival from kinetic and non-kinetic threats to the aircraft. The TADS/PNVS system incorporates upgraded software and continues flight testing in support of hardware/software modifications and weapons testing. MUMT-X supports annual software updates for current and future OFP updates and cyber security requirements along with maintenance and support for all required MUMT-X diagnostic testing assets to meet interoperability requirements. LI 2706AA6605 - AH-64 MODS Army UNCLASSIFIED Page 4 of 27 P-1 Line #17 Volume 1 - 82 === page 119 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA6606 / AH-64 APACHE MODS MDAP/MAIS Code: Systems Engineering and Program Management include the technical and management efforts of directing and controlling a totally integrated modification program to include: Safety, Compliance, Training, Contracting, Product Support, Software, Engineering Management, Programmatic Management, and Logistics. System Test and Evaluation includes the continued support of the Apache Test Fleet to include scheduled and unscheduled maintenance, qualification of pilots, and travel in support of project test events. This additionally provides support to integration labs for the Apache Interoperability Station and Engineering Analysis Cockpit. Training Systems include all the hardware and deliverable training services required to train and maintain AH64D/E Pilots currency. The Longbow Crew Trainer (LCT) is the operator training device and is the sole flight simulator used to train AH64 D/E pilots. It consists of 35 Directorate of Simulation (DOS) accredited devices in multiple configurations to match the fielded aircraft configuration to ensure pilot currency. Maintainer Training Devices are comprised of a suite of 129 hardware devices that require technical refreshes and update to the current AH-64E V6 and future AH-64E V6.5 configurations for the respective training institutions. Courseware and devices include Virtual Training Suite (VTS) development concurrency and sustainment of courseware to include hosting of other training content within the Virtual Training Environment (VTE). Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 2706AA6605 - AH-64 MODS Army FY 2025 FY 2027 Base FY 2026 - 93.826 93.826 131.236 131.236 FY 2027 OOC - 251.645 251.645 UNCLASSIFIED Page 5 of 27 FY 2027 Total - FY 2028 - FY 2029 - 251.645 265.581 - - 251.645 265.581 P-1 Line #17 FY 2030 - 265.547 265.547 FY 2031 - - 265.548 - 265.637 - 265.548 265.637 Volume 1 - 83 === page 120 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Longbow Apache Modification Type: Operational & Reliability Improvements and Resolve Obsolescence Issues Prior Years Financial Plan Modification Number / Title: AA6606 / AH-64 APACHE MODS FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 17: Aircraft Software A Kits Recurring V6.5 Fielding Subtotal: Recurring Subtotal: Aircraft Software - / - - / - - / - 120 / 23.869 - / - 120 / 23.869 96 / 16.750 84 / 17.717 84 / 18.007 84 / 18.302 Continuing Continuing - / - - / - - / - 120 / 23.869 - / - 120 / 23.869 96 / 16.750 84 / 17.717 84 / 18.007 84 / 18.302 Continuing Continuing - / - - / - - / - 120 / 23.869 - / - 120 / 23.869 96 / 16.750 84 / 17.717 84 / 18.007 84 / 18.302 Continuing Continuing Modification Item 2 of 17: Airframe A Kits Recurring Health Monitoring System RESET / MEP Kits - Other Support - Armament - Airframe Subtotal: Airframe / 25.318 - Drive System Subtotal: Recurring / 85.878 - / 195.970 - / 0.148 / 77.436 - / 13.674 - / 13.266 - - / - - / 1.003 / 15.624 - / - - / - - / - - / - - / - - / - - / - - / - - / 2.051 - / - - / - - / - - / - - / - - / - - / - - / - - / 19.830 - / - - / - - / - - / - - / - - / - - / - - / - - / 0.050 - / 0.050 - / - - / - - / - - / - - / - - / - - / - - / - / 28.116 - / 6.565 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 115.176 / 199.024 - / 58.414 - - / 0.248 / 112.117 / - - / 0.281 - / - - / 0.281 - / 0.287 - / 0.293 - / 0.298 - / 0.179 - / - - / 384.750 - / 56.109 - / 44.120 - / 0.281 - / - - / 0.281 - / 0.287 - / 0.293 - / 0.298 - / 0.179 - / - - - / 486.317 / 1.338 - / 384.750 - / 56.109 - / 44.120 - / 0.281 - / - - / 0.281 - / 0.287 - / 0.293 - / 0.298 - / 0.179 - / - - / 486.317 Modification Item 3 of 17: Communications A Kits Recurring Communications - / - - / - - / - - / 0.259 - / - - / 0.259 - / 0.264 - / 0.268 - / 0.272 - / 0.277 Continuing Continuing Subtotal: Recurring - / - - / - - / - - / 0.259 - / - - / 0.259 - / 0.264 - / 0.268 - / 0.272 - / 0.277 Continuing Continuing STT KOR-24A - / - - / - - / - 96 / 6.977 - / - 96 / 6.977 96 / 6.502 50 / 5.837 - / 0.523 - / - - / - Subtotal: Recurring - / - - / - - / - 96 / 6.977 - / - 96 / 6.977 96 / 6.502 50 / 5.837 - / 0.523 - / - - / - - / - - / - - / - 96 / 7.236 - / - 96 / 7.236 96 / 6.766 50 / 6.105 - / 0.795 / 0.277 Continuing B Kits Recurring Subtotal: Communications - 242 / 19.839 242 / 19.839 Continuing Modification Item 4 of 17: Contractor Logistics Support (CLS) A Kits LI 2706AA6605 - AH-64 MODS Army UNCLASSIFIED Page 6 of 27 P-1 Line #17 Volume 1 - 84 === page 121 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Longbow Apache Modification Type: Operational & Reliability Improvements and Resolve Obsolescence Issues Prior Years Financial Plan Modification Number / Title: AA6606 / AH-64 APACHE MODS FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Recurring Contractor Logistics Support - / - - / - - / - - / 5.851 - / - - / 5.851 - / 6.020 - / 6.195 - / - - / - - / - - / 18.066 - / - - / - - / - - / 5.851 - / - - / 5.851 - / 6.020 - / 6.195 - / - - / - - / - - / 18.066 - / - - / - - / - - / 5.851 - / - - / 5.851 - / 6.020 - / 6.195 - / - - / - - / - - / 18.066 ITRDS Fielding - / - - / - - / - - / - - / - - / - - / - 24 / 6.825 48 / 13.914 96 / 28.405 Continuing Continuing Subtotal: Recurring - / - - / - - / - - / - - / - - / - - / - 24 / 6.825 48 / 13.914 96 / 28.405 Continuing Continuing - / - - / - - / - - / 3.464 - / - - / 3.464 - / 4.636 - / 5.136 - / 2.550 - / - - / - - / 15.786 - / - - / - - / - - / 3.464 - / - - / 3.464 - / 4.636 - / 5.136 - / 2.550 - / - - / - - / 15.786 - / - - / - - / - - / 3.464 - / - - / 3.464 - / 4.636 24 / 11.961 48 / 16.464 96 / 28.405 Continuing Continuing Subtotal: Recurring Subtotal: Contractor Logistics Support (CLS) Modification Item 5 of 17: Drives A Kits Recurring Non-Recurring Drives Subtotal: Non-Recurring Subtotal: Drives Modification Item 6 of 17: Electrical Subsystem A Kits Recurring - / - - / - - / - - / - - / - - / - - / - 24 / 6.335 48 / 12.920 96 / 26.342 Continuing Continuing Subtotal: Recurring Oil Cooled Generator (OCG) - / - - / - - / - - / - - / - - / - - / - 24 / 6.335 48 / 12.920 96 / 26.342 Continuing Continuing Subtotal: Electrical Subsystem - / - - / - - / - - / - - / - - / - - / - 24 / 6.335 48 / 12.920 96 / 26.342 Continuing Continuing - / - - / - - / - - / 1.543 - / - - / 1.543 - / 1.571 - / 1.600 - / 1.628 - / 1.656 Continuing Continuing - / - - / - - / - - / 1.543 - / - - / 1.543 - / 1.571 - / 1.600 - / 1.628 - / 1.656 Continuing Continuing - / - - / - - / - - / 1.543 - / - - / 1.543 - / 1.571 - / 1.600 - / 1.628 - / 1.656 Continuing Continuing - / - - / - - / - - / 1.941 - / - - / 1.941 - / 1.982 - / 1.699 - / 1.734 - / 1.768 Continuing Continuing - / - - / - - / - - / 1.941 - / - - / 1.941 - / 1.982 - / 1.699 - / 1.734 - / 1.768 Continuing Continuing Modification Item 7 of 17: Integrated Logistics Support (ILS) A Kits Recurring Integrated Logistics Support (ILS) Subtotal: Recurring Subtotal: Integrated Logistics Support (ILS) Modification Item 8 of 17: Peculiar Support Equipment A Kits Recurring Peculiar Support Equipment Subtotal: Recurring LI 2706AA6605 - AH-64 MODS Army UNCLASSIFIED Page 7 of 27 P-1 Line #17 Volume 1 - 85 === page 122 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Longbow Apache Modification Type: Operational & Reliability Improvements and Resolve Obsolescence Issues Prior Years Financial Plan Modification Number / Title: AA6606 / AH-64 APACHE MODS FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Subtotal: Peculiar Support Equipment - / - - / - - / - / 1.941 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - - / - - / - - / 6.000 - / - - / 6.000 - / - - - / - - / - - / 6.000 - / - - / 1.699 Continuing Continuing - / - - / - - / 7.593 - / - - / - - / 7.593 - / 1.982 - / - - / 7.593 - / - - / - - / - - / 7.593 - / - - / - / - - / - - / - 120 / 45.262 120 / 46.136 120 / 47.094 Continuing Continuing / - - / - - / - 120 / 45.262 120 / 46.136 120 / 47.094 Continuing Continuing - / - - / - / 7.593 120 / 45.262 120 / 46.136 120 / 47.094 Continuing Continuing - / 1.734 / 1.768 / 1.941 - - - Modification Item 9 of 17: Rotors A Kits Non-Recurring Improved Tail Rotor Blade (ITRB) Subtotal: Non-Recurring B Kits Recurring Improved Tail Rotor Blade (ITRB) Subtotal: Recurring Subtotal: Rotors - Modification Item 10 of 17: Sensors A Kits Recurring Other Support - / 29.716 - / 1.267 - / 5.333 Sensor Modernization - / 10.778 - / 4.091 - / 6.533 V6.5 Fielding - Coyote Modem Subtotal: Recurring Subtotal: Sensors - / - - / - - - / - - / - / 5.658 - / - - / - - / 5.658 - / - - / 8.744 - / - - / 8.623 - / - - / 8.564 - - / - - / - - / - - / 36.316 / 8.021 Continuing Continuing / - 120 / 7.649 - / - 120 / 7.649 96 / 7.658 13 / 0.864 / - Continuing Continuing - / 40.494 - / 5.358 - / 11.866 120 / 13.307 - / - 120 / 13.307 96 / 16.402 13 / 9.487 - / 8.564 - / 8.021 Continuing Continuing - / 40.494 - / 5.358 - / 11.866 120 / 13.307 - / - 120 / 13.307 96 / 16.402 13 / 9.487 - / 8.564 - / 8.021 Continuing Continuing Modification Item 11 of 17: Systems Engineering / Program Management (SEPM) A Kits Recurring Systems Engineering & Program Management Subtotal: Recurring Subtotal: Systems Engineering / Program Management (SEPM) - / - - / - - / - - / 83.107 - / - - / 83.107 - / 84.006 - / 76.800 - / 86.310 - / 76.327 Continuing Continuing - / - - / - - / - - / 83.107 - / - - / 83.107 - / 84.006 - / 76.800 - / 86.310 - / 76.327 Continuing Continuing - / - - / - - / - - / 83.107 - / - - / 83.107 - / 84.006 - / 76.800 - / 86.310 - / 76.327 Continuing Continuing Modification Item 12 of 17: Systems Test and Evaluation A Kits Recurring LI 2706AA6605 - AH-64 MODS Army UNCLASSIFIED Page 8 of 27 P-1 Line #17 Volume 1 - 86 === page 123 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Longbow Apache Modification Type: Operational & Reliability Improvements and Resolve Obsolescence Issues Prior Years Financial Plan Modification Number / Title: AA6606 / AH-64 APACHE MODS FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) System Test & Evaluation Subtotal: Recurring Subtotal: Systems Test and Evaluation - / - - / - - / - - / 18.705 - / - - / 18.705 - / 22.039 - / 19.704 - / 20.096 - / 20.505 Continuing Continuing - / - - / - - / - - / 18.705 - / - - / 18.705 - / 22.039 - / 19.704 - / 20.096 - / 20.505 Continuing Continuing - / - - / - - / - - / 18.705 - / - - / 18.705 - / 22.039 - / 19.704 - / 20.096 - / 20.505 Continuing Continuing Modification Item 13 of 17: Training Systems A Kits Recurring Maintainer Devices - / 51.778 - / 5.820 - / 15.867 - / - - / - - / - - / - - / - - / - - / - - / - - Other Support - / 14.859 - / 2.350 - / 14.678 - / - - / - - / - - / - - / - - / - - / - - / - - / 3.342 - / 1.769 / 2.112 - / - - / - - / - - / - - / - - / - - / - - / - Courseware and Devices - Training Equipment & Services LCT Concurrence & Obsolescence Subtotal: Recurring Subtotal: Training Systems - / - - / - - - / / - / 73.465 / 31.887 - / 7.223 - / - - / 41.699 - / - - / 41.699 - / 45.376 - / 18.107 - / 13.203 - / 4.268 - / - - / 122.653 - / - - / 50.642 - / - - / 50.642 - / 47.363 - / 10.932 - / 10.304 - / 4.579 - / - - / 123.820 - / 69.979 - / 9.939 - / 32.657 - / 92.341 - / - - / 92.341 - / 92.739 - / 29.039 - / 23.507 - / 8.847 - / - - / 359.048 - / 69.979 - / 9.939 - / 32.657 - / 92.341 - / - - / 92.341 - / 92.739 - / 29.039 - / 23.507 - / 8.847 - / - - / 359.048 / 17.119 - / 20.146 - / - - / - - / - - / - - / - - / - - / - - / - - / 5.301 - / 16.447 - / - - / - - / - - / - - / - - / - - / - - / - Modification Item 14 of 17: Mission Command A Kits Recurring Processors - Other Support / 160.684 - - / 16.342 - / 197.949 - / 38.090 Subtotal: Recurring - / 177.026 - / 22.420 - / 36.593 - / - - / - - / - - / - - / - - / - - / - - / - - / 236.039 Subtotal: Mission Command - / 177.026 - / 22.420 - / 36.593 - / - - / - - / - - / - - / - - / - - / - - / - - / 236.039 Modification Item 15 of 17: Hellfire Missile Launchers A Kits Recurring Hellfire Missile Launchers Subtotal: Recurring Subtotal: Hellfire Missile Launchers - / 50.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 50.000 - / 50.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 50.000 - / 50.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 50.000 / 8,710.755 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Modification Item 16 of 17: AH-64 Mods Prior Year Cost A Kits Recurring AH-64 Mods Prior Year Cost LI 2706AA6605 - AH-64 MODS Army - UNCLASSIFIED Page 9 of 27 P-1 Line #17 - / 8,710.755 Volume 1 - 87 === page 124 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: Longbow Apache Modification Type: Operational & Reliability Improvements and Resolve Obsolescence Issues Prior Years Financial Plan Subtotal: Recurring Subtotal: AH-64 Mods Prior Year Cost Modification Number / Title: AA6606 / AH-64 APACHE MODS FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) - / 8,710.755 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 8,710.755 - / 8,710.755 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 8,710.755 21 / 35.237 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 21 / 35.237 21 / 35.237 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 21 / 35.237 18 / 37.433 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 18 / 37.433 18 / 37.433 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 18 / 37.433 39 / 72.670 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 131.236 336 / 251.645 - / - 336 / 251.645 Modification Item 17 of 17: Spike Non-Line of Sight (NLOS) Integration A Kits Recurring Spike NLOS Integration Subtotal: Recurring B Kits Recurring Spike NLOS Hardware Subtotal: Recurring Subtotal: Spike Non-Line of Sight (NLOS) Integration Subtotal: Procurement, All Modification Items 39 / 9,505.674 - / 93.826 - 288 / 260.791 315 / 232.197 300 / 236.459 396 / 237.723 24 / 4.790 120 / 26.167 24 / 20.839 84 / 19.154 Continuing 39 / 72.670 Continuing Installation Modification Item 1 of 17: Aircraft Software - Modification Item 2 of 17: Airframe / - - / - - / - - / - - / - - / - 1/ - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 252 / 70.950 1/ - Modification Item 5 of 17: Drives - / - - / - - / - - / - - / - - / - - / - - / - Modification Item 6 of 17: Electrical Subsystem - / - - / - - / - - / - - / - - / - - / - - / - - / - 24 / 2.489 - / - 24 / 2.489 Modification Item 9 of 17: Rotors - / - - / - - / - - / - - / - - / - - / - - / - - / - 120 / 0.583 - / - 120 / 0.583 Modification Item 10 of 17: Sensors 96 / 5.860 13 / 0.809 726 / 13.852 48 / 4.879 96 / 9.948 168 / 17.217 497 / - - / - - / - - / - - / - - / - - / - - / - Modification Item 13 of 17: Training Systems 1/ - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1/ - Modification Item 14 of 17: Mission Command 1/ - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1/ - Modification Item 15 of 17: Hellfire Missile Launchers 1/ - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1/ - Modification Item 16 of 17: AH-64 Mods Prior Year Cost 1/ - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1/ - 502 / - - / - - / - - / - - / - - / - 24 / 4.790 240 / 33.350 144 / 29.089 289 / 27.914 251.645 265.581 265.547 265.548 265.637 Subtotal: Installation 120 / 7.183 24 / 2.390 96 / 9.948 1,295 / 105.091 Total Total Cost (Procurement + Support + Installation) LI 2706AA6605 - AH-64 MODS Army 9,505.674 93.826 131.236 251.645 - UNCLASSIFIED Page 10 of 27 P-1 Line #17 Continuing Continuing Volume 1 - 88 === page 125 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA6606 / AH-64 APACHE MODS MDAP/MAIS Code: Modification Item 1 of 17: Aircraft Software Manufacturer Information Manufacturer Name: The Boeing Company Manufacturer Location: Mesa, Arizona Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 21 FY 2025 FY 2026 Contract Dates FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Dec 2026 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Dec 2028 Dec 2029 Dec 2030 Delivery Dates Installation Information Method of Implementation: V6.5 Field Retrofits Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - 24 / 4.790 - / - - / - - / - - / - 24 / 4.790 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 120 / 26.167 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 24 / 20.839 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 84 / 19.154 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - 120 / 26.167 24 / 4.790 24 / 20.839 120 / 26.167 84 / 19.154 24 / 20.839 84 / 19.154 252 / 70.950 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - 30 30 30 30 24 24 24 24 21 21 21 21 21 21 21 21 21 21 21 21 - 468 Out - - - - - - - - - - - - - - - - - 30 30 30 30 24 24 24 24 21 21 21 21 168 468 LI 2706AA6605 - AH-64 MODS Army UNCLASSIFIED Page 11 of 27 P-1 Line #17 Volume 1 - 89 === page 126 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA6606 / AH-64 APACHE MODS MDAP/MAIS Code: Modification Item 2 of 17: Airframe Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): Dates Production Leadtime (in Months): FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Modifications Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 1 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.000 FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 1 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.000 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 Out 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 LI 2706AA6605 - AH-64 MODS Army UNCLASSIFIED Page 12 of 27 P-1 Line #17 Volume 1 - 90 === page 127 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA6606 / AH-64 APACHE MODS MDAP/MAIS Code: Modification Item 3 of 17: Communications Manufacturer Information Manufacturer Name: ViaSat Manufacturer Location: Florida Administrative Leadtime (in Months): 3 Dates FY 2025 Contract Dates Delivery Dates Production Leadtime (in Months): 9 FY 2026 FY 2027 FY 2028 FY 2029 Dec 2026 Dec 2027 Dec 2028 Dec 2027 Dec 2028 FY 2030 FY 2031 Dec 2029 Installation Information Method of Implementation (Organic): Field Retrofit LI 2706AA6605 - AH-64 MODS Army Installation Quantity: 0 UNCLASSIFIED Page 13 of 27 P-1 Line #17 Volume 1 - 91 === page 128 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA6606 / AH-64 APACHE MODS MDAP/MAIS Code: Modification Item 4 of 17: Contractor Logistics Support (CLS) Manufacturer Information Manufacturer Name: Lockheed Martin Manufacturer Location: Orlando, Florida Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Field Retrofit LI 2706AA6605 - AH-64 MODS Army Installation Quantity: 0 UNCLASSIFIED Page 14 of 27 P-1 Line #17 Volume 1 - 92 === page 129 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA6606 / AH-64 APACHE MODS MDAP/MAIS Code: Modification Item 5 of 17: Drives Manufacturer Information Manufacturer Name: The Boeing Company Manufacturer Location: Mesa, AZ Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 9 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates FY 2029 FY 2030 FY 2031 Dec 2028 Dec 2029 Dec 2030 Dec 2029 Dec 2030 Delivery Dates Installation Information Method of Implementation: ITRDS Field Retrofit Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 24 / 2.390 - / - - / - 24 / 2.390 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 48 / 4.879 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 96 / 9.948 96 / 9.948 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - - / - 48 / 4.879 24 / 2.390 - 48 / 4.879 / - 96 / 9.948 - / - 168 / 17.217 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - 6 6 6 6 12 12 12 12 24 24 24 24 96 264 Out - - - - - - - - - - - - - - - - - 6 6 6 6 12 12 12 12 192 264 LI 2706AA6605 - AH-64 MODS Army UNCLASSIFIED Page 15 of 27 - - - - P-1 Line #17 Volume 1 - 93 === page 130 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA6606 / AH-64 APACHE MODS MDAP/MAIS Code: Modification Item 6 of 17: Electrical Subsystem Manufacturer Information Manufacturer Name: The Boeing Company Manufacturer Location: Mesa, AZ Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 21 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates FY 2029 FY 2030 FY 2031 Dec 2028 Dec 2029 Dec 2030 Delivery Dates Dec 2030 Installation Information Method of Implementation: Oil Cooled Generator (OCG) Field Retrofit Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 24 / 2.489 - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - - / - - / - 24 / 2.489 - / - 24 / 2.489 24 / 2.489 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - 6 6 6 6 12 12 12 12 24 24 24 24 96 264 Out - - - - - - - - - - - - - - - - - - - - - 6 6 6 6 240 264 LI 2706AA6605 - AH-64 MODS Army UNCLASSIFIED Page 16 of 27 - - - - P-1 Line #17 Volume 1 - 94 === page 131 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA6606 / AH-64 APACHE MODS MDAP/MAIS Code: Modification Item 7 of 17: Integrated Logistics Support (ILS) Manufacturer Information Manufacturer Name: Various Manufacturer Location: Redstone Arsenal, AL Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Field Retrofit LI 2706AA6605 - AH-64 MODS Army Installation Quantity: 0 UNCLASSIFIED Page 17 of 27 P-1 Line #17 Volume 1 - 95 === page 132 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA6606 / AH-64 APACHE MODS MDAP/MAIS Code: Modification Item 8 of 17: Peculiar Support Equipment Manufacturer Information Manufacturer Name: Various Manufacturer Location: Redstone Arsenal, AL Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Field Retrofit LI 2706AA6605 - AH-64 MODS Army Installation Quantity: 0 UNCLASSIFIED Page 18 of 27 P-1 Line #17 Volume 1 - 96 === page 133 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA6606 / AH-64 APACHE MODS MDAP/MAIS Code: Modification Item 9 of 17: Rotors Manufacturer Information Manufacturer Name: The Boeing Company Manufacturer Location: Mesa, AZ Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 21 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates FY 2029 FY 2030 FY 2031 Dec 2028 Dec 2029 Dec 2030 Delivery Dates Dec 2030 Installation Information Method of Implementation: ITRB Field Retrofit Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 120 / 0.583 120 / 0.583 120 / 0.583 120 / 0.583 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - - - - - - - - - - - - - - 30 30 30 30 30 30 30 30 30 30 30 30 120 480 Out - - - - - - - - - - - - - - - - - - - - - - - - - 30 30 30 30 360 480 LI 2706AA6605 - AH-64 MODS Army UNCLASSIFIED Page 19 of 27 P-1 Line #17 Volume 1 - 97 === page 134 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA6606 / AH-64 APACHE MODS MDAP/MAIS Code: Modification Item 10 of 17: Sensors Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 21 FY 2025 FY 2026 Contract Dates FY 2027 FY 2028 FY 2029 Dec 2026 Dec 2027 Dec 2028 Delivery Dates Dec 2028 FY 2030 FY 2031 Dec 2029 Dec 2030 Installation Information Method of Implementation: Coyote Modem Modifications Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 487 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 487 / 0.000 FY 2025 7 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 7 / 0.000 FY 2026 3 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 3 / 0.000 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 120 / 7.183 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 96 / 5.860 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - 13 / 0.809 - / - 13 / 0.809 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 13 / 0.809 - / - Total 497 / 0.000 120 / 7.183 96 / 5.860 120 / 7.183 96 / 5.860 726 / 13.852 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 521 - - - - - - - - 30 30 30 30 24 24 24 24 13 - - - - - - - - - - - - 750 Out 518 - - - - - - - - - - - - - - - 30 30 30 30 24 24 24 24 13 - - - - 750 3 LI 2706AA6605 - AH-64 MODS Army UNCLASSIFIED Page 20 of 27 P-1 Line #17 Volume 1 - 98 === page 135 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA6606 / AH-64 APACHE MODS MDAP/MAIS Code: Modification Item 11 of 17: Systems Engineering / Program Management (SEPM) Manufacturer Information Manufacturer Name: Program Office Support Manufacturer Location: Redstone Arsenal, AL Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Program Office Support LI 2706AA6605 - AH-64 MODS Army Installation Quantity: 0 UNCLASSIFIED Page 21 of 27 P-1 Line #17 Volume 1 - 99 === page 136 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA6606 / AH-64 APACHE MODS MDAP/MAIS Code: Modification Item 12 of 17: Systems Test and Evaluation Manufacturer Information Manufacturer Name: Various Manufacturer Location: Redstone Arsenal, AL Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Test & Evaluation Support LI 2706AA6605 - AH-64 MODS Army Installation Quantity: 0 UNCLASSIFIED Page 22 of 27 P-1 Line #17 Volume 1 - 100 === page 137 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA6606 / AH-64 APACHE MODS MDAP/MAIS Code: Modification Item 13 of 17: Training Systems Manufacturer Information Manufacturer Name: Boeing / Logistic Services International, Inc. Manufacturer Location: St. Louis, MO / Jacksonville, FL Administrative Leadtime (in Months): Dates Production Leadtime (in Months): FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Field Retrofits Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 1 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.000 FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 1 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.000 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 Out 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 LI 2706AA6605 - AH-64 MODS Army UNCLASSIFIED Page 23 of 27 P-1 Line #17 Volume 1 - 101 === page 138 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA6606 / AH-64 APACHE MODS MDAP/MAIS Code: Modification Item 14 of 17: Mission Command Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): Dates Production Leadtime (in Months): FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: . Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 1 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.000 FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 1 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.000 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 Out 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 LI 2706AA6605 - AH-64 MODS Army UNCLASSIFIED Page 24 of 27 P-1 Line #17 Volume 1 - 102 === page 139 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA6606 / AH-64 APACHE MODS MDAP/MAIS Code: Modification Item 15 of 17: Hellfire Missile Launchers Manufacturer Information Manufacturer Name: Lockheed Martin Missiles and Fire Control Manufacturer Location: Orlando, Florida Administrative Leadtime (in Months): Dates Production Leadtime (in Months): FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Armament Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 1 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.000 FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 1 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.000 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 Out 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 LI 2706AA6605 - AH-64 MODS Army UNCLASSIFIED Page 25 of 27 P-1 Line #17 Volume 1 - 103 === page 140 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA6606 / AH-64 APACHE MODS MDAP/MAIS Code: Modification Item 16 of 17: AH-64 Mods Prior Year Cost Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): Dates Production Leadtime (in Months): FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Modifications Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 1 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.000 FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 1 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.000 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 Out 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 LI 2706AA6605 - AH-64 MODS Army UNCLASSIFIED Page 26 of 27 P-1 Line #17 Volume 1 - 104 === page 141 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 P-1 Line Item Number / Title: 2706AA6605 / AH-64 MODS ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA6606 / AH-64 APACHE MODS MDAP/MAIS Code: Modification Item 17 of 17: Spike Non-Line of Sight (NLOS) Integration Manufacturer Information Manufacturer Name: Lockheed Martin Manufacturer Location: Orlando, Florida Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): 16 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Modifications LI 2706AA6605 - AH-64 MODS Army Installation Quantity: 0 UNCLASSIFIED Page 27 of 27 P-1 Line #17 Volume 1 - 105 === page 142 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 2724A12700 / SCALABLE CONTROL INTERFACE (SCI) Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 Procurement Quantity (Units in Each) - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - - 1.257 2.061 - 2.061 0.789 0.806 0.823 Less PY Advance Procurement ($ in Millions) - - - - - - - - - Net Procurement (P-1) ($ in Millions) - - 1.257 2.061 - 2.061 0.789 0.806 0.823 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - Total Obligation Authority ($ in Millions) - - 1.257 2.061 - 2.061 0.789 0.806 0.823 To FY 2031 Complete - Total - 0.831 Continuing - Continuing - 0.831 Continuing - Continuing - - 0.831 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Uncrewed Vehicle Control (UVC) Scalable Control Interface (SCI) is a permissions-based software control suite used by Soldiers to simultaneously control multiple, disparate types of uncrewed or optionallymanned aircraft and payloads through a universal interface with scalable levels of authority. SCI distributes UAS capabilities by greatly enabling more control devices available to Soldiers, Commanders, and Battle Staff. SCI provides simultaneous employment of multiple aircraft/payloads from a single control node. SCI leverages a Modular Open System Approach (MOSA) to software in order to reduce time and cost to integrate new hardware and software in response to the dynamic future operating environment. Deployment of SCI includes devices in the Mobile/Handheld Computing Environment (such as Nett Warrior), Mounted Computing Environment such as Mounted Family of Computer Systems (MFoCS), Command Post Computing Environment such as Tactical Services Infrastructure (TSI), fixed wing aircraft, and rotary wing aircraft. UVC will integrate decision aiding, autonomy, and artificial intelligence improvements as they technically mature, in order to support Multi-Domain Operations and reduce cognitive workload. Secondary Distribution Army Total: Secondary Distribution FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 Quantity - - - - - - - - - Total Obligation Authority - 1.257 2.061 - 2.061 0.789 0.806 0.823 0.831 Quantity - - - - - - - - - Total Obligation Authority - 1.257 2.061 - 2.061 0.789 0.806 0.823 0.831 Justification: FY 2027 procurement dollars supports training integration, platform fielding, and user reach back support. This funding prioritizes SCI training, fielding, and integration on Small Unmanned Aerial Systems (SUAS) and Launched Effects. LI 2724A12700 - SCALABLE CONTROL INTERFACE (SCI) Army UNCLASSIFIED Page 1 of 1 P-1 Line #18 Volume 1 - 106 === page 143 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 3264AA0252 / CH-47 Cargo Helicopter Mods (MYP) Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 278 Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 11,219.436 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 38.925 17.709 85.833 86.831 90.853 Less PY Advance Procurement ($ in Millions) 1,168.857 - - Net Procurement (P-1) ($ in Millions) 10,050.579 38.925 17.709 Plus CY Advance Procurement ($ in Millions) 1,168.857 - - Total Obligation Authority ($ in Millions) 11,219.436 38.925 17.709 108.408 - - 108.408 - 108.408 - - - 108.408 - 108.408 - - 108.408 - - - 85.833 86.831 90.853 - - - 85.833 86.831 90.853 To FY 2031 Complete 126.734 Continuing 126.734 Continuing Continuing 126.734 Total - 1,168.857 Continuing - 1,168.857 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The CH-47F Chinook, the Army's only heavy lift helicopter, is the enduring platform that supports Army Continuous Transformation Initiative. The CH-47F is a critical component of Transformation in Contact units to conduct Multi-Domain Operations (MDO) and Defense Support to Civil Authorities (DSCA) such as firefighting, flood rescue, and disaster relief successfully. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution FY 2025 - - 38.925 17.709 Quantity Total Obligation Authority FY 2027 Base FY 2026 - - 38.925 17.709 LI 3264AA0252 - CH-47 Cargo Helicopter Mods (MYP) Army FY 2027 OOC - 108.408 108.408 UNCLASSIFIED Page 1 of 20 FY 2027 Total - FY 2028 - 108.408 FY 2030 FY 2031 - - 85.833 86.831 90.853 108.408 FY 2029 - - - 85.833 86.831 90.853 P-1 Line #19 126.734 126.734 Volume 1 - 107 === page 144 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 3264AA0252 / CH-47 Cargo Helicopter Mods (MYP) Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 278 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a AA0252 / CH-47 Cargo Helicopter Mods (MYP) (Unclassified) - / 11,219.436 - / 38.925 - / 17.709 - / 108.408 - / - - P-40 Total Gross/Weapon System Cost - / 11,219.436 - / 38.925 - / 17.709 - / 108.408 - / - - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code / 108.408 / 108.408 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a AA0252 / CH-47 Cargo Helicopter Mods (MYP) (Unclassified) - / 85.833 - / 86.831 - / 90.853 - / 126.734 Continuing Continuing P-40 Total Gross/Weapon System Cost - / 85.833 - / 86.831 - / 90.853 - / 126.734 Continuing Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding supports the interim sustainment of the CH-47F fleet and enables future fielding of production aircraft. Funding procures critical avionics updates and safety improvements to maintain the CH-47F Avionics and Software systems, insert technologies such as Health and Usage Monitoring Systems (HUMS), Improved Vibration Control System (IVCS), communication security improvements, cyber security improvements, Assured Position Navigation and Timing (APNT) and the future common enterprise cockpit architecture. These will address obsolescence, needed tech insertions and updates, address improvements in aircraft handling qualities, Modular Open Systems Approach (MOSA), and provide integration opportunities for common equipment providers to insert technology improvements through development, integration, testing, and fielding by way of the Common Avionics Architecture System (CAAS) and Digital Advanced Flight Control System (DAFCS) MOSA interfaces. FY 2026 to FY 2027 funding increase is to address hardware obsolescence issues, such as Multi End Roving Glass (MERG), Cruise Guide Indicator (CGI), Data Concentrator Unit (DCU), Cockpit Voice and Data Reporter (CVDR), and integrate obsolescence solutions as a tech refresh into the platform itself and, as applicable, integrate those solutions into the platform software. Additionally, this funding supports critical software and hardware upgrades required to maintain fleet viability, prevent capability degradation due to obsolete components (e.g., Data Transfer Unit-7100), and improve interoperability across the platform through efforts such as EAGLE-M, Multi-Platform Anti-Jamming GPS Navigation Antenna (MAGNA), and CAAS 10.2.2. This increase also accounts for increased expenses in system safety, airworthiness support, software integration labs infrastructure, CAAS and DAFCS support, and other associated engineering and integration efforts. *Note: EAGLE-M is not an acronym. It is the name of an embedded GPS Navigation System with an M-Code cape. LI 3264AA0252 - CH-47 Cargo Helicopter Mods (MYP) Army UNCLASSIFIED Page 2 of 20 P-1 Line #19 Volume 1 - 108 === page 145 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 3264AA0252 / CH-47 Cargo Helicopter Mods (MYP) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Modification Number / Title: AA0252 / CH-47 Cargo Helicopter Mods (MYP) 11,219.436 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 38.925 17.709 85.833 86.831 90.853 Less PY Advance Procurement ($ in Millions) 1,168.857 - - Net Procurement (P-1) ($ in Millions) 10,050.579 38.925 17.709 Plus CY Advance Procurement ($ in Millions) 1,168.857 - - Total Obligation Authority ($ in Millions) 11,219.436 38.925 17.709 108.408 - - 108.408 - 108.408 - - - 108.408 - 108.408 - - 108.408 - - - 85.833 86.831 90.853 - - - 85.833 86.831 90.853 To FY 2031 Complete - Total - 126.734 Continuing - - 126.734 Continuing - 1,168.857 Continuing - 126.734 Continuing 1,168.857 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The significant modifications to the CH-47F include: Improving cyber security, communication security (COMSEC), aircraft handling qualities through iterative development, integration, testing and fielding to the Common Avionics Architecture System (CAAS) and the Digital Automatic Flight Control System (DAFCS); integrating and fielding capability to the remaining fleet with Improved Vibration Control System (IVCS) and Health and Usage Monitoring Systems (HUMS) maintaining currency and certification of fleet Training Aids Devices Simulators and Simulations (TADSS); refreshing avionics software to address cyber security threats and safety improvements; replacing obsolete parts critical for aircraft operation and unavailable hardware and equipment. The modifications support requirements driven by rapid changes in the commercial electronics hardware market, heavy industry market, evolving cyber security threats, military interoperability, and civil airspace navigation. These modifications require software systems updates, testing, integration, training, and logistics support. The funding priorities are developing, testing, and fielding improvements in cyber security, aircraft handling qualities, obsolescence, HUMS, COMSEC, IVCS, Assured Positioning Navigation Timing (APNT), improved multi-core processors, and expansion of the flexibility provided by the CAAS Modular Open Systems Approach (MOSA) to maintain capability as well as insert new capabilities. Secondary Distribution Army FY 2025 Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 3264AA0252 - CH-47 Cargo Helicopter Mods (MYP) Army FY 2027 Base FY 2026 - - 38.925 17.709 - - 38.925 17.709 FY 2027 OOC - 108.408 108.408 UNCLASSIFIED Page 3 of 20 FY 2027 Total - FY 2028 - 108.408 FY 2030 FY 2031 - - 85.833 86.831 90.853 108.408 FY 2029 - - - 85.833 86.831 90.853 P-1 Line #19 126.734 126.734 Volume 1 - 109 === page 146 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 3264AA0252 / CH-47 Cargo Helicopter Mods (MYP) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: CH-47 Modification Type: Unclassified Prior Years Financial Plan Modification Number / Title: AA0252 / CH-47 Cargo Helicopter Mods (MYP) FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 12: Block I Hardware/Software Obsolescence and Upgrades A Kits Non-Recurring Avionics Updates (CAAS, DAFCS, CPHE) - Safety Impr (SW Corrections, Cyber) / 45.872 - Subtotal: Non-Recurring - / 8.867 / 0.292 - - / 10.908 / - - - / 54.739 - / 0.292 - / 12.747 - / 3.131 - / 12.747 - / 3.131 - / 67.486 - / 3.423 - / 25.000 - / - - - / 25.000 - / - - - / 25.000 - / - / 1,854.411 - 30 / 356.518 - - / - / 88.398 - / - - / - - / - - / 88.398 - - / 77.250 / - - - / 78.148 / - - / 81.768 / - - / - Continuing Continuing - / - Continuing Continuing / 114.061 Continuing Continuing / 88.398 - / - - / 88.398 - / 3.134 - / 10.840 - / - - / 10.840 - / 8.583 - / 8.683 - / 9.085 - / 12.673 Continuing Continuing - / 3.134 - / 10.840 - / - - / 10.840 - / 8.583 - / 8.683 - / 9.085 - / 12.673 Continuing Continuing / 14.042 - / 99.238 - / - - / 99.238 / 126.734 Continuing Continuing / - - / - - / - - / - - / - - / - - / - - / - - / - - / 25.000 / - - / - - / - - / - - / - - / - - / - - / - - / - - / 25.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 25.000 / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 81.768 / 114.061 - - / 78.148 - / 10.908 - / 77.250 - - - B Kits Recurring PM Support Subtotal: Recurring Subtotal: Block I Hardware/Software Obsolescence and Upgrades - - / 85.833 - / 86.831 - / 90.853 - Modification Item 2 of 12: Degraded Visual Environment A Kits Non-Recurring CH-47 degraded visual environments Subtotal: Non-Recurring Subtotal: Degraded Visual Environment Modification Item 3 of 12: Block I COOLS & COOLS BPS A Kits Recurring Cargo Handling Floor System Ballistic Protection System (BPS) - PM Support Cargo Handling Floor System (OCO) PM Support (OCO) Subtotal: Recurring Subtotal: Block I COOLS & COOLS BPS - / 6.658 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 29.300 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1,854.411 30 / 356.518 - / 6.658 / 29.300 / 8.010 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 30 / 2,254.897 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 30 / 2,254.897 30 / 2,254.897 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 30 / 2,254.897 LI 3264AA0252 - CH-47 Cargo Helicopter Mods (MYP) Army UNCLASSIFIED Page 4 of 20 P-1 Line #19 - / 8.010 Volume 1 - 110 === page 147 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 3264AA0252 / CH-47 Cargo Helicopter Mods (MYP) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: CH-47 Modification Type: Unclassified Prior Years Financial Plan Modification Number / Title: AA0252 / CH-47 Cargo Helicopter Mods (MYP) FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Modification Item 4 of 12: Block I Cargo Platform Health Environment (CPHE) / HUMS A Kits Recurring Kits Type 1 CPHE Software Upgrade Services 131 / 3,078.617 - / 595.796 - / - / 9.170 - / - / 9.170 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing / 61.108 - / 7.100 / 1.656 - / 0.796 131 / 3,737.177 - / 7.896 PM Support Subtotal: Recurring - - - / 3.211 - / / 3.211 - - - / - - / - / 9.170 - / - - - Continuing - / - Continuing - / 595.796 / - - / - - / - - / - - / - Continuing Continuing / 9.170 - / - - / - - / - - / - Continuing Continuing Non-Recurring NRE Subtotal: Non-Recurring Subtotal: Block I Cargo Platform Health Environment (CPHE) / HUMS - / 6.751 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 6.751 - / 6.751 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 6.751 / 9.170 - / - / 9.170 - / - - / - - / - - / - Continuing Continuing 131 / 3,743.928 / 7.896 - / 3.211 - - - Modification Item 5 of 12: Block I CH-47 Safety Mods $5M or Less A Kits Recurring Voltage Standing Wave Ratio (VSWR) - / 2.239 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FCTS (FADEC Continuity Test Set) - / 6.430 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 15.592 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Misc Mods - Swashplate Assembly / 0.575 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Hook Load Measuring System - / 10.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Engine Air Particle Separator (EAPS) - / 21.195 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - PM Support - / 11.776 - / - - / - - / - - / - - / - - / - - / - - / - - / - Frangible Fuel Fitting - / 10.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - - / 77.807 - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Critical Safety Issues 1 / 7.414 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Subtotal: Non-Recurring 1 / 7.414 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 85.221 - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Subtotal: Recurring - Continuing / - - / 2.239 / 6.430 / 15.592 - / 0.575 - / 10.000 - / 21.195 Continuing - / 10.000 Continuing Non-Recurring Subtotal: Block I CH-47 Safety Mods $5M or Less LI 3264AA0252 - CH-47 Cargo Helicopter Mods (MYP) Army UNCLASSIFIED Page 5 of 20 P-1 Line #19 1 / 7.414 1 / 7.414 Continuing Volume 1 - 111 === page 148 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 3264AA0252 / CH-47 Cargo Helicopter Mods (MYP) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: CH-47 Modification Type: Unclassified Prior Years Financial Plan Modification Number / Title: AA0252 / CH-47 Cargo Helicopter Mods (MYP) FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Modification Item 6 of 12: Block I Improved Vibration Control System (IVCS) A Kits Recurring Kits 251 / 133.534 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 2.025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 251 / 135.559 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 251 / 135.559 251 / 135.559 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 251 / 135.559 PM Support Subtotal: Recurring Subtotal: Block I Improved Vibration Control System (IVCS) - 251 / 133.534 - / 2.025 Modification Item 7 of 12: Improved Troop Seats (ITS) A Kits Recurring Installation Kits - / 14.653 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 14.653 Subtotal: Recurring - / 14.653 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 14.653 - / 14.653 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 14.653 Subtotal: Improved Troop Seats (ITS) Modification Item 8 of 12: Block I Adjustable Pitch Change Link A Kits Recurring Pitch Change Links - / 2.311 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 2.311 PM Support - / 0.158 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.158 - / 2.469 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 2.469 - / 15.582 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 15.582 - / 15.582 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 15.582 - / 18.051 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 18.051 - / 45.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 45.000 / 4,495.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Subtotal: Recurring Non-Recurring NRE Subtotal: Non-Recurring Subtotal: Block I Adjustable Pitch Change Link Modification Item 9 of 12: Block I Engine Improvements A Kits Recurring T55 Engine Control Unit Prog (ECU) New Engines - LI 3264AA0252 - CH-47 Cargo Helicopter Mods (MYP) Army UNCLASSIFIED Page 6 of 20 P-1 Line #19 - / 4,495.000 Volume 1 - 112 === page 149 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 3264AA0252 / CH-47 Cargo Helicopter Mods (MYP) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: CH-47 Modification Type: Unclassified Prior Years Financial Plan Modification Number / Title: AA0252 / CH-47 Cargo Helicopter Mods (MYP) FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) P3 Check Valve - Next Generation Torque System - Logistics - / 4.900 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 14.500 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - - / 4.900 / 14.500 / 39.953 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - ECU Upgrade - / 5.760 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 5.760 RIMFIRE - / 2.159 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 2.159 PM Admin Support - / 4.613 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 4.613 / 4,611.885 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - ECP NRE/Incorporation - / 1.062 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1.062 Subtotal: Non-Recurring - / 1.062 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1.062 / 4,612.947 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Component Markings - / 37.506 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 37.506 Subtotal: Non-Recurring - / 37.506 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 37.506 - / 37.506 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 37.506 - / 7.853 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 7.853 - / 7.853 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 7.853 - / 157.065 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 157.065 - / 157.065 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 157.065 - / 164.918 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 164.918 Subtotal: Recurring - / 39.953 / 4,611.885 - Non-Recurring Subtotal: Block I Engine Improvements - / 4,612.947 - Modification Item 10 of 12: Block I Aircraft Component Parts-Marking (UID) A Kits Non-Recurring Subtotal: Block I Aircraft Component Parts-Marking (UID) Modification Item 11 of 12: Block I Systems Optimization & Payload Restoration A Kits Recurring PM Support Subtotal: Recurring Non-Recurring NRE Subtotal: Non-Recurring Subtotal: Block I Systems Optimization & Payload Restoration Modification Item 12 of 12: Block I Light Weight COOLS BPS (LBPS) LI 3264AA0252 - CH-47 Cargo Helicopter Mods (MYP) Army UNCLASSIFIED Page 7 of 20 P-1 Line #19 Volume 1 - 113 === page 150 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 3264AA0252 / CH-47 Cargo Helicopter Mods (MYP) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: CH-47 Modification Type: Unclassified Prior Years Financial Plan Modification Number / Title: AA0252 / CH-47 Cargo Helicopter Mods (MYP) FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) A Kits Recurring Lightweight ballistic protection systems 15 / 15.000 9 / 8.100 - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing 15 / 15.000 9 / 8.100 - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing 15 / 15.000 9 / 8.100 - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing 428 / 11,175.166 9 / 19.419 / 108.408 - / - / 126.734 Continuing Continuing 264 / 34.567 41 / 15.000 / - - / - - / - - / - Modification Item 4 of 12: Block I Cargo Platform Health Environment (CPHE) / HUMS 83 / 7.470 24 / 4.506 15 / 0.456 - / - - / - - / - Modification Item 6 of 12: Block I Improved Vibration Control System (IVCS) 23 / 2.233 Subtotal: Recurring Subtotal: Block I Light Weight COOLS BPS (LBPS) Subtotal: Procurement, All Modification Items - / 17.253 - - / 108.408 - / 85.833 - / 86.831 - / 90.853 - Installation Modification Item 3 of 12: Block I COOLS & COOLS BPS Modification Item 12 of 12: Block I Light Weight COOLS BPS (LBPS) Subtotal: Installation - / - - - - / 6/ - - / - - / - - / - - / - 305 / 49.567 24 / - 24 / - - / - Continuing Continuing Continuing Continuing / - - / - - / - - / - - / - - / - - / - - / - - / - 9/ - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 6/ - 24 / - 24 / - - / - Continuing Continuing 108.408 85.833 86.831 90.853 126.734 Continuing Continuing 370 / 44.270 74 / 19.506 15 / 0.456 11,219.436 38.925 17.709 - / - 9/ - Total Total Cost (Procurement + Support + Installation) LI 3264AA0252 - CH-47 Cargo Helicopter Mods (MYP) Army 108.408 - UNCLASSIFIED Page 8 of 20 P-1 Line #19 Volume 1 - 114 === page 151 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 P-1 Line Item Number / Title: 3264AA0252 / CH-47 Cargo Helicopter Mods (MYP) ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0252 / CH-47 Cargo Helicopter Mods (MYP) MDAP/MAIS Code: Modification Item 1 of 12: Block I Hardware/Software Obsolescence and Upgrades Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): TBD LI 3264AA0252 - CH-47 Cargo Helicopter Mods (MYP) Army Installation Quantity: 0 UNCLASSIFIED Page 9 of 20 P-1 Line #19 Volume 1 - 115 === page 152 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 P-1 Line Item Number / Title: 3264AA0252 / CH-47 Cargo Helicopter Mods (MYP) ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0252 / CH-47 Cargo Helicopter Mods (MYP) MDAP/MAIS Code: Modification Item 2 of 12: Degraded Visual Environment Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): TBD LI 3264AA0252 - CH-47 Cargo Helicopter Mods (MYP) Army Installation Quantity: 0 UNCLASSIFIED Page 10 of 20 P-1 Line #19 Volume 1 - 116 === page 153 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 3264AA0252 / CH-47 Cargo Helicopter Mods (MYP) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0252 / CH-47 Cargo Helicopter Mods (MYP) MDAP/MAIS Code: Modification Item 3 of 12: Block I COOLS & COOLS BPS Manufacturer Information Manufacturer Name: Boeing Manufacturer Location: Ridley Park, PA Administrative Leadtime (in Months): 1 Dates Production Leadtime (in Months): 1 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Various Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - - / - - / - - / - - / - - / - - / - - / - - / - - / - 264 / 34.567 - / - - / - - / - - / - - / - - / - - / - - / - - / - 41 / 15.000 Prior Years 264 / 34.567 - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total / - / - FY 2025 41 / 15.000 264 / 34.567 41 / 15.000 305 / 49.567 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 305 - - - 41 - - - - - - - - - - - - - - - - - - - - - - - - - 346 Out 305 - - - 41 - - - - - - - - - - - - - - - - - - - - - - - - - 346 LI 3264AA0252 - CH-47 Cargo Helicopter Mods (MYP) Army UNCLASSIFIED Page 11 of 20 P-1 Line #19 Volume 1 - 117 === page 154 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 3264AA0252 / CH-47 Cargo Helicopter Mods (MYP) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0252 / CH-47 Cargo Helicopter Mods (MYP) MDAP/MAIS Code: Modification Item 4 of 12: Block I Cargo Platform Health Environment (CPHE) / HUMS Manufacturer Information Manufacturer Name: Boeing Manufacturer Location: Ridley Park, PA Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 37 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Various Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing 24 / 4.506 - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing 15 / 0.456 - / - - / - - / - - / - - / - - / - - / - Continuing Prior Years 83 / 7.470 FY 2025 - / - FY 2026 - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2028 - / - - / - - / - - / - - / - - / - 6 / 0.000 - / - - / - - / - - / - 6 / 0.000 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 24 / 0.000 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 24 / 0.000 - / - - / - 24 / 0.000 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 15 / 0.456 - / - - / - - / - 6 / 0.000 24 / 0.000 - / - Total 83 / 7.470 24 / 4.506 24 / 0.000 24 / 0.000 Continuing 247 / 22.230 Continuing / - - / - 247 / 22.230 Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 161 6 6 6 6 - - - - - - - - - - - - - - - - - - - - - - - - 145 330 Out 83 - - - - - - - - - - - - - - - - - - - - - - - - 247 330 - - - - LI 3264AA0252 - CH-47 Cargo Helicopter Mods (MYP) Army UNCLASSIFIED Page 12 of 20 P-1 Line #19 Volume 1 - 118 === page 155 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 P-1 Line Item Number / Title: 3264AA0252 / CH-47 Cargo Helicopter Mods (MYP) ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0252 / CH-47 Cargo Helicopter Mods (MYP) MDAP/MAIS Code: Modification Item 5 of 12: Block I CH-47 Safety Mods $5M or Less Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Various LI 3264AA0252 - CH-47 Cargo Helicopter Mods (MYP) Army Installation Quantity: 0 UNCLASSIFIED Page 13 of 20 P-1 Line #19 Volume 1 - 119 === page 156 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 3264AA0252 / CH-47 Cargo Helicopter Mods (MYP) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0252 / CH-47 Cargo Helicopter Mods (MYP) MDAP/MAIS Code: Modification Item 6 of 12: Block I Improved Vibration Control System (IVCS) Manufacturer Information Manufacturer Name: Boeing Manufacturer Location: Ridley Park PA Administrative Leadtime (in Months): Dates Production Leadtime (in Months): FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Various Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Continuing Continuing Prior Years 23 / 2.233 - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 23 / 2.233 - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 271 / 11.585 Continuing 271 / 11.585 Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 251 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 251 Out 251 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 251 LI 3264AA0252 - CH-47 Cargo Helicopter Mods (MYP) Army UNCLASSIFIED Page 14 of 20 P-1 Line #19 Volume 1 - 120 === page 157 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 P-1 Line Item Number / Title: 3264AA0252 / CH-47 Cargo Helicopter Mods (MYP) ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0252 / CH-47 Cargo Helicopter Mods (MYP) MDAP/MAIS Code: Modification Item 7 of 12: Improved Troop Seats (ITS) Manufacturer Information Manufacturer Name: Boeing Manufacturer Location: Ridley Park, PA Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Various LI 3264AA0252 - CH-47 Cargo Helicopter Mods (MYP) Army Installation Quantity: 0 UNCLASSIFIED Page 15 of 20 P-1 Line #19 Volume 1 - 121 === page 158 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 P-1 Line Item Number / Title: 3264AA0252 / CH-47 Cargo Helicopter Mods (MYP) ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0252 / CH-47 Cargo Helicopter Mods (MYP) MDAP/MAIS Code: Modification Item 8 of 12: Block I Adjustable Pitch Change Link Manufacturer Information Manufacturer Name: Boeing Manufacturer Location: Ridley Park, PA Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): User Installed LI 3264AA0252 - CH-47 Cargo Helicopter Mods (MYP) Army Installation Quantity: 0 UNCLASSIFIED Page 16 of 20 P-1 Line #19 Volume 1 - 122 === page 159 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 P-1 Line Item Number / Title: 3264AA0252 / CH-47 Cargo Helicopter Mods (MYP) ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0252 / CH-47 Cargo Helicopter Mods (MYP) MDAP/MAIS Code: Modification Item 9 of 12: Block I Engine Improvements Manufacturer Information Manufacturer Name: Honeywell Inc Manufacturer Location: Phoenix, AZ Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Various LI 3264AA0252 - CH-47 Cargo Helicopter Mods (MYP) Army Installation Quantity: 0 UNCLASSIFIED Page 17 of 20 P-1 Line #19 Volume 1 - 123 === page 160 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 P-1 Line Item Number / Title: 3264AA0252 / CH-47 Cargo Helicopter Mods (MYP) ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0252 / CH-47 Cargo Helicopter Mods (MYP) MDAP/MAIS Code: Modification Item 10 of 12: Block I Aircraft Component Parts-Marking (UID) Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Various LI 3264AA0252 - CH-47 Cargo Helicopter Mods (MYP) Army Installation Quantity: 0 UNCLASSIFIED Page 18 of 20 P-1 Line #19 Volume 1 - 124 === page 161 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 P-1 Line Item Number / Title: 3264AA0252 / CH-47 Cargo Helicopter Mods (MYP) ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0252 / CH-47 Cargo Helicopter Mods (MYP) MDAP/MAIS Code: Modification Item 11 of 12: Block I Systems Optimization & Payload Restoration Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Various LI 3264AA0252 - CH-47 Cargo Helicopter Mods (MYP) Army Installation Quantity: 0 UNCLASSIFIED Page 19 of 20 P-1 Line #19 Volume 1 - 125 === page 162 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 3264AA0252 / CH-47 Cargo Helicopter Mods (MYP) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0252 / CH-47 Cargo Helicopter Mods (MYP) MDAP/MAIS Code: Modification Item 12 of 12: Block I Light Weight COOLS BPS (LBPS) Manufacturer Information Manufacturer Name: Boeing Manufacturer Location: Ridley Park, PA Administrative Leadtime (in Months): 1 Dates Production Leadtime (in Months): 2 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Various Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - 9 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - 9 / 0.000 FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - 9 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - 9 / 0.000 / - / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In - - - - 9 - - - - - - - - - - - - - - - - - - - - - - - - - 9 Out - - - - 9 - - - - - - - - - - - - - - - - - - - - - - - - - 9 LI 3264AA0252 - CH-47 Cargo Helicopter Mods (MYP) Army UNCLASSIFIED Page 20 of 20 P-1 Line #19 Volume 1 - 126 === page 163 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 6949AA0480 / Utility Helicopter Mods Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 1,857.099 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 39.565 38.659 13.500 - - 1,843.599 39.565 38.659 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 13.500 - - 1,857.099 39.565 38.659 120.013 - - 120.013 - 120.013 - - - 120.013 - 120.013 - - 120.013 152.950 85.347 - 128.451 - 85.347 128.451 - 85.347 Continuing 128.451 Continuing Continuing - 114.551 Total - - 114.551 - 152.950 - 114.551 - 152.950 To FY 2031 Complete 13.500 Continuing - 13.500 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Utility Helicopter Mods include modifications to the UH-60 Black Hawk and the UH-72 Lakota helicopters. The UH-60 Black Hawk helicopter is the Army's utility helicopter for the near and midterm force. It is a twin engine, single rotor, four bladed utility helicopter used for air assault, general support, command & control, and aero-medical evacuations (MEDEVAC). The UH-60 is joint force capable, providing 24 hour/ day support including operations at night and in adverse weather conditions. The UH-60 is designed to carry a crew of four plus eleven combat equipped troops or an external load up to 9,000 pounds. The UH-60 Black Hawk was fielded in 1978 as a replacement for the UH-1. From 1978 to 1988, UH-60As were produced. In 1989 production of UH-60Ls with improved engines and drive train began. In 2007, full rate production of UH-60Ms began which provided a digital cockpit, digital Flight Management System (FMS), improved engine, and wide-cord main rotor blades. The UH-72 Lakota helicopter provides general aviation support for aviation units in the active and reserve components. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 6949AA0480 - Utility Helicopter Mods Army FY 2025 FY 2027 Base FY 2026 - - 39.565 38.659 - - 39.565 38.659 FY 2027 OOC - 120.013 120.013 UNCLASSIFIED Page 1 of 10 FY 2027 Total - FY 2028 - FY 2029 - 120.013 152.950 - - 120.013 152.950 P-1 Line #20 FY 2030 - 85.347 85.347 FY 2031 - 114.551 114.551 128.451 128.451 Volume 1 - 127 === page 164 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 6949AA0480 / Utility Helicopter Mods Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a AA0492 / UTILITY HELICOPTER MODS (Operational) - / 1,857.099 - / 39.565 - / 38.659 - / 120.013 - / - - P-40 Total Gross/Weapon System Cost - / 1,857.099 - / 39.565 - / 38.659 - / 120.013 - / - - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code / 120.013 / 120.013 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a AA0492 / UTILITY HELICOPTER MODS (Operational) - / 152.950 - / 85.347 - / 114.551 - / 128.451 Continuing Continuing P-40 Total Gross/Weapon System Cost - / 152.950 - / 85.347 - / 114.551 - / 128.451 Continuing Continuing *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding will procure and install Mission Equipment Upgrades with launched effects, avionic upgrades to support Modular Open Systems Approach (MOSA) Avionics Architecture Solution (AAS) and survivability upgrades with Upturned Exhaust System (UES) II and mission equipment with the 60kVA Generator to provide additional power for future system upgrades. FY 2026 to FY 2027 Funding Increase will support MOSA, Digital Engineering, and Software Modernization/Sustainment. LI 6949AA0480 - Utility Helicopter Mods Army UNCLASSIFIED Page 2 of 10 P-1 Line #20 Volume 1 - 128 === page 165 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 6949AA0480 / Utility Helicopter Mods Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: AA0492 / UTILITY HELICOPTER MODS MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 1,857.099 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 39.565 38.659 13.500 - - 1,843.599 39.565 38.659 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 13.500 - - 1,857.099 39.565 38.659 120.013 - - 120.013 - 120.013 - - - 120.013 - 120.013 - - 120.013 152.950 85.347 - - Continuing - 114.551 13.500 Continuing - 128.451 Continuing - 128.451 - 85.347 Continuing - 114.551 Total - 128.451 - 85.347 152.950 - 114.551 - 152.950 To FY 2031 Complete 13.500 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: FY 2027 dollars will procure and install, Air Vehicle Improvements, Avionics Upgrades, Survivability & Safety Upgrades, and Mission Equipment Upgrades to include Federated Launched Effects. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 6949AA0480 - Utility Helicopter Mods Army FY 2025 FY 2027 Base FY 2026 - - 39.565 38.659 - - 39.565 38.659 FY 2027 OOC - 120.013 120.013 UNCLASSIFIED Page 3 of 10 FY 2027 Total - FY 2028 - FY 2029 - 120.013 152.950 - - 120.013 152.950 P-1 Line #20 FY 2030 - 85.347 85.347 FY 2031 - 114.551 114.551 128.451 128.451 Volume 1 - 129 === page 166 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 6949AA0480 / Utility Helicopter Mods Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: UH-60, UH-72 Modification Type: Operational Prior Years Financial Plan Modification Number / Title: AA0492 / UTILITY HELICOPTER MODS FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 4: Air Vehicle Improvements A Kits Recurring Generator A-Kits 2,299 / 27.868 - / - - / - - / - - / - - / - - / - - / - - / - - / - Engine Inlet Barrier Filter (EIBF) 30 / 0.840 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 30 / 0.840 UH-60A to UH-60L Conversion 276 / 375.248 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 276 / 375.248 2,605 / 403.956 - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing Continuing Continuing Subtotal: Recurring Continuing Continuing Non-Recurring UH-60A to UH-60L Conversion - UH-60M Weight Reduction - Tail Rotor Sys Subtotal: Non-Recurring / 967.939 - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 11.000 - - / 5.000 - / - - / - - / - - / - - / - - / - - / - - / - - / 978.939 - / 5.000 - / - - / - - / - - / - - / - - / - - / - - / - Continuing 20 / 4.260 20 / 6.692 / - - / 16.000 Continuing B Kits Recurring Generator B-Kits Engine Inlet Barrier Filter (EIBF) Subtotal: Recurring Subtotal: Air Vehicle Improvements 380 / 54.436 - / - - / - 50 / 5.500 - / - - / - 430 / 59.936 - / - - / 5.000 3,035 / 1,442.831 - - / - / - - / - / - 20 / 4.260 - / - 20 / 4.260 20 / 4.626 20 / 5.128 - / - 20 / 4.260 - / - 20 / 4.260 20 / 4.626 20 / 5.128 - 20 / 4.260 - 20 / 4.626 / - - 20 / 5.128 / - - 20 / 5.799 - / - / - - / - 50 / 5.500 20 / 5.799 20 / 6.692 - / - 530 / 86.441 20 / 5.799 20 / 6.692 Continuing / - - / - - 480 / 80.941 Continuing Modification Item 2 of 4: Avionics Upgrades A Kits Recurring Backup Altitude Indicators Electronic Standby Instrument Sys (ESIS) Subtotal: Recurring 265 / 14.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 33 / 4.877 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 265 / 14.000 33 / 4.877 298 / 18.877 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 298 / 18.877 Non-Recurring Avionics Modernization - / - - / - - / - - / 61.008 - / - - / 61.008 - / 70.060 - / 46.957 - / 5.638 - / 10.347 Continuing Continuing Subtotal: Non-Recurring - / - - / - - / - - / 61.008 - / - - / 61.008 - / 70.060 - / 46.957 - / 5.638 - / 10.347 Continuing Continuing 26 / 4.804 - / - - / - - / - - / - - / - - / - / 27.398 - / - B Kits Recurring Electronic Standby Instrument Sys (ESIS) Avionics Modernization LI 6949AA0480 - Utility Helicopter Mods Army - / - - UNCLASSIFIED Page 4 of 10 - / - / 27.398 - / - / 17.842 - / - 45 / 18.949 P-1 Line #20 - / - 185 / 88.515 - / - 185 / 96.521 - / - Continuing 26 / 4.804 Continuing Volume 1 - 130 === page 167 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 6949AA0480 / Utility Helicopter Mods Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: UH-60, UH-72 Modification Type: Operational Prior Years Financial Plan Modification Number / Title: AA0492 / UTILITY HELICOPTER MODS FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Subtotal: Recurring 26 / 4.804 - / - - / - - / 27.398 - / - - / 27.398 - / 17.842 45 / 18.949 185 / 88.515 185 / 96.521 Continuing Continuing Subtotal: Avionics Upgrades 324 / 23.681 - / - - / - - / 88.406 - / - - / 88.406 - / 87.902 45 / 65.906 185 / 94.153 185 / 106.868 Continuing Continuing Crashworthy External Fuel System (CEFS) 1,295 / 139.920 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1,295 / 139.920 Enhanced Ballistic Armor Protection Sys 375 / 40.640 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 375 / 40.640 / 5.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1,670 / 185.560 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Modification Item 3 of 4: Survivability and Safety Upgrades A Kits Recurring EBAPS (Other) Subtotal: Recurring - - / 5.000 1,670 / 185.560 Non-Recurring UH-72 Sustainability Improvements Subtotal: Non-Recurring - / 10.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 10.000 - / 10.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 10.000 - / - - / - - / - - / - - / - B Kits Recurring UES II B Kit Recurring UES Subtotal: Recurring 155 / 42.560 19 / 3.732 103 / 29.829 97 / 28.722 174 / 46.292 103 / 29.829 97 / 28.722 90 / 23.182 - / - 90 / 23.182 90 / 23.182 - / - 90 / 23.182 45 / 11.848 - / - 45 / 11.848 45 / 12.086 - / - 45 / 12.086 45 / 12.374 - / - 45 / 12.374 45 / 12.621 - / - 45 / 12.621 Continuing Continuing Continuing Continuing Continuing Continuing Non-Recurring UES Subtotal: Non-Recurring Subtotal: Survivability and Safety Upgrades - / 1.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1.000 - / 1.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1.000 - / - 1,844 / 242.852 103 / 29.829 97 / 28.722 90 / 23.182 90 / 23.182 45 / 11.848 45 / 12.086 45 / 12.374 45 / 12.621 Continuing Continuing Modification Item 4 of 4: Mission Equipment Modifications A Kits Recurring External High Speed Hoist 285 / 82.321 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 17 / 46.394 - / - - / - - / - - / - 17 / 46.394 285 / 82.321 - / - - / - - / - - / - - / - 17 / 46.394 - / - - / - - / - - / - 302 / 128.715 Load Stability System (LSS) 11 / 16.500 - / - 15 / 5.000 - / - - / - - / - - / - - / - - / - - / - - / - 26 / 21.500 Powered Ascenders - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Fedrated LE Subtotal: Recurring - / - - / - 285 / 82.321 Non-Recurring LI 6949AA0480 - Utility Helicopter Mods Army / 2.500 - / - UNCLASSIFIED Page 5 of 10 P-1 Line #20 / 2.500 Volume 1 - 131 === page 168 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 6949AA0480 / Utility Helicopter Mods Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: UH-60, UH-72 Modification Type: Operational Prior Years Financial Plan Subtotal: Non-Recurring Modification Number / Title: AA0492 / UTILITY HELICOPTER MODS FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) 11 / 19.000 - / - 15 / 5.000 - / - - / - - / - Subtotal: Mission Equipment Modifications 296 / 101.321 - / - 15 / 5.000 - / - - / - - / - Subtotal: Procurement, All Modification Items 5,499 / 1,810.685 103 / 34.829 112 / 33.722 110 / 115.848 - / - 110 / 115.848 82 / 150.770 110 / 83.120 250 / 112.326 250 / 126.181 Continuing Continuing Modification Item 1 of 4: Air Vehicle Improvements 591 / 8.036 56 / 0.382 95 / 0.652 20 / 0.140 20 / 0.140 20 / 0.143 20 / 0.146 20 / 0.149 20 / 0.152 Modification Item 2 of 4: Avionics Upgrades 234 / 25.310 Modification Item 3 of 4: Survivability and Safety Upgrades 518 / 13.068 104 / 4.354 1,343 / 46.414 1,857.099 - / - 17 / 46.394 - / - - / - - / - - / - 26 / 24.000 - / - - / - - / - - / - 328 / 152.715 Installation Subtotal: Installation - / - / - - / - 98 / 4.285 90 / 4.025 - / - 90 / 4.025 45 / 2.037 45 / 2.081 160 / 4.736 193 / 4.937 110 / 4.165 - / - 110 / 4.165 65 / 2.180 39.565 38.659 120.013 - 120.013 152.950 - / - - / - - - / - - / - Continuing Continuing / - Continuing Continuing 45 / 2.076 45 / 2.118 Continuing Continuing 65 / 2.227 65 / 2.225 65 / 2.270 Continuing Continuing 85.347 114.551 128.451 Continuing Continuing - / - - / - - Total Total Cost (Procurement + Support + Installation) LI 6949AA0480 - Utility Helicopter Mods Army UNCLASSIFIED Page 6 of 10 P-1 Line #20 Volume 1 - 132 === page 169 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 6949AA0480 / Utility Helicopter Mods Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0492 / UTILITY HELICOPTER MODS MDAP/MAIS Code: Modification Item 1 of 4: Air Vehicle Improvements Manufacturer Information Manufacturer Name: Honeywell Aerospace - Various Manufacturer Location: Tucson, AZ - Various Administrative Leadtime (in Months): Dates Production Leadtime (in Months): FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Various Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - / - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing 56 / 0.382 - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing 95 / 0.652 - / - - / - - / - - / - - / - - / - - / - Continuing 20 / 0.140 - / - 20 / 0.140 - / - - / - - / - - / - - / - 20 / 0.140 20 / 0.143 - / - - / - - / - - / - 20 / 0.143 20 / 0.146 - / - - / - - / - 20 / 0.146 20 / 0.149 - / - - / - 20 / 0.149 20 / 0.152 - / - 20 / 0.152 - / - Prior Years 591 / 8.036 FY 2025 - / - FY 2026 - / - - / - FY 2027 - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - 20 / 0.140 - / - Total 591 / 8.036 56 / 0.382 95 / 0.652 20 / 0.140 20 / 0.143 20 / 0.146 - 20 / 0.149 / - 20 / 0.152 Continuing Continuing - / - Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 Out 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 LI 6949AA0480 - Utility Helicopter Mods Army UNCLASSIFIED Page 7 of 10 P-1 Line #20 Volume 1 - 133 === page 170 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 6949AA0480 / Utility Helicopter Mods Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0492 / UTILITY HELICOPTER MODS MDAP/MAIS Code: Modification Item 2 of 4: Avionics Upgrades Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): Dates Production Leadtime (in Months): FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Various Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Continuing Continuing Prior Years 234 / 25.310 - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 234 / 25.310 Continuing Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 172 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 172 Out 172 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 172 LI 6949AA0480 - Utility Helicopter Mods Army UNCLASSIFIED Page 8 of 10 P-1 Line #20 Volume 1 - 134 === page 171 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 6949AA0480 / Utility Helicopter Mods Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0492 / UTILITY HELICOPTER MODS MDAP/MAIS Code: Modification Item 3 of 4: Survivability and Safety Upgrades Manufacturer Information Manufacturer Name: Sikorsky - Various Manufacturer Location: Stratford, CT - Various Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Various Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing - / - - / - - / - - / - - / - - / - - / - - / - Continuing Continuing 98 / 4.285 - / - - / - - / - - / - - / - - / - - / - Continuing 90 / 4.025 - / - 90 / 4.025 - / - - / - - / - - / - 45 / 2.037 - / - - / - - / - Continuing Continuing - / - - / - Continuing Continuing 45 / 2.076 - / - Continuing Continuing 45 / 2.118 Continuing Prior Years 518 / 13.068 / - FY 2025 - / - FY 2026 - / - - / - FY 2027 - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - 90 / 4.025 - / - Total 104 / 4.354 518 / 13.068 104 / 4.354 98 / 4.285 90 / 4.025 45 / 2.081 45 / 2.037 45 / 2.081 - 45 / 2.076 - / - - 45 / 2.118 Continuing / - 90 / 4.025 Continuing / - Continuing - / - Continuing Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 Out 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 LI 6949AA0480 - Utility Helicopter Mods Army UNCLASSIFIED Page 9 of 10 P-1 Line #20 Volume 1 - 135 === page 172 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 P-1 Line Item Number / Title: 6949AA0480 / Utility Helicopter Mods ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0492 / UTILITY HELICOPTER MODS MDAP/MAIS Code: Modification Item 4 of 4: Mission Equipment Modifications Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Various LI 6949AA0480 - Utility Helicopter Mods Army Installation Quantity: 0 UNCLASSIFIED Page 10 of 10 P-1 Line #20 Volume 1 - 136 === page 173 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 8658AA0712 / Network And Mission Plan Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0604201A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 1,141.419 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 1,141.419 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 1,141.419 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 49.862 43.472 29.235 - 29.235 35.471 30.657 38.076 - - - - - - - - 49.862 43.472 29.235 - 29.235 35.471 30.657 38.076 - - - - - - - - 49.862 43.472 29.235 - 29.235 35.471 30.657 38.076 To FY 2031 Complete - Total - 55.236 Continuing - Continuing - 55.236 Continuing - Continuing - - 55.236 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Aviation Mission Planning System (AMPS) supports pre-mission planning including route planning, communications planning, and aircraft configuration. It receives data from multiple sources and provides that data digitally to aircraft platforms to support aviation missions. That data is loaded onto the aircraft platforms utilizing a Data Transfer Device initializing the communication, navigation, and weapons systems on the aircraft. The Improved Data Modem (IDM) Open System Remanufacture (OSR) will be an obsolescence replacement for the IDM 401. It will enable multi-core processing to meet requirements for air-to-air and air-toground communications. The IDM OSR will be a remove and replace for the current IDM 401. It will serve as a steppingstone to a longer-term solution, the General-Purpose Computing Platform (GPCP). The GPCP is a capability upgrade for the current Army IDM 401 and IDM OSR. It will provide the ability to rapidly apply technology upgrades utilizing a Modular Open Systems Approach (MOSA) with a nonproprietary Open Systems Architecture (OSA) to keep pace with evolving threats in the Multi-Domain Battlefield. The GPCP enables the hosting of applications to communicate, navigate, sense and deploy weapon systems across the Joint Force in support of Army Transformation in Contact and future aviation operations. It supports the future Common Digital Backbone for the enduring and future Army Aviation fleets with the ability to host flight critical capabilities and Next Generation Command and Control (NGC2) data forms. GPCP is required to host multiple applications and reduce the number of Line Replaceable Units in the aircraft. FY 2026 Congressional Add for Flight Scheduling Software (Aviation Status Dashboard) will support the procurement of software that incorporates a set of tools to help automate redundant tasks in support of flight operations. Secondary Distribution Army Quantity Total Obligation Authority ANG Quantity Total Obligation Authority AR Quantity LI 8658AA0712 - Network And Mission Plan Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 31.234 28.428 17.797 - 17.797 20.662 17.856 22.177 32.172 - - - - - - - - - 16.558 13.612 10.349 - 10.349 13.399 11.582 14.385 20.867 - - - - - - - - - UNCLASSIFIED Page 1 of 13 P-1 Line #21 Volume 1 - 137 === page 174 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 8658AA0712 / Network And Mission Plan Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0604201A Line Item MDAP/MAIS Code: N/A Secondary Distribution Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 8658AA0712 - Network And Mission Plan Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 2.070 1.432 1.089 - 1.089 1.410 1.219 1.514 - - - - - - - - - 49.862 43.472 29.235 - 29.235 35.471 30.657 38.076 55.236 UNCLASSIFIED Page 2 of 13 P-1 Line #21 2.197 Volume 1 - 138 === page 175 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 8658AA0712 / Network And Mission Plan Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: 0604201A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a AA0712 / Network And Mission Plan (Rationalization, Standardization, Interoperability, Compatibility, Simplification) - / 1,141.419 - / 49.862 - / 43.472 - / 29.235 - / - - P-40 Total Gross/Weapon System Cost - / 1,141.419 - / 49.862 - / 43.472 - / 29.235 - / - - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code / 29.235 / 29.235 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Continuing Continuing Continuing Continuing P-3a AA0712 / Network And Mission Plan (Rationalization, Standardization, Interoperability, Compatibility, Simplification) - / 35.471 - / 30.657 - / 38.076 - / 55.236 P-40 Total Gross/Weapon System Cost - / 35.471 - / 30.657 - / 38.076 - / 55.236 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Funding supports Aviation Mission Planning System (AMPS) capability efforts, Improved Data Modem (IDM) fielding, and software integration activities to include cybersecurity compliance. FY 2026 to FY 2027 funding for the IDM Open System Remanufacture (OSR) decreased to support Army directive (Enabling Modern Software Development and Acquisition Practices). FY 2026 to FY 2027 funding for the AMPS decreased to support the integration of Mission Command System requirements and transition efforts for deployment of Next Generation Command and Control (NGC2). In accordance with section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110 - 181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 8658AA0712 - Network And Mission Plan Army UNCLASSIFIED Page 3 of 13 P-1 Line #21 Volume 1 - 139 === page 176 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 8658AA0712 / Network And Mission Plan Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: AA0712 / Network And Mission Plan MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 1,141.419 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 1,141.419 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 1,141.419 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 49.862 43.472 29.235 - 29.235 35.471 30.657 38.076 - - - - - - - - 49.862 43.472 29.235 - 29.235 35.471 30.657 38.076 - - - - - - - - 49.862 43.472 29.235 - 29.235 35.471 30.657 38.076 To FY 2031 Complete - Total - 55.236 Continuing - Continuing - 55.236 Continuing - Continuing - - 55.236 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Aviation Mission Planning System (AMPS) supports pre-mission planning and rehearsal, including route planning, communications planning, and aircraft configuration. It receives data from multiple sources and provides that data digitally to aircraft platforms to support aviation missions. That data is loaded onto the aircraft platforms utilizing a Data Transfer Device initializing the communication, navigation, and weapons systems on the aircraft. The Improved Data Modem (IDM) Open System Remanufacture (OSR) will be an obsolescence replacement for the IDM 401. It will enable multi-core processing to meet requirements for air to ground communications. The IDM OSR will be a remove and replace for the current IDM 401. It will serve as a steppingstone to a longer-term solution, the General-Purpose Computing Platform (GPCP). To meet the Next Generation Command and Control (NGC2) requirements as specified in the infrastructure annex of the NGC2 Initial Capabilities Document, specifically, a software control plane so the compute environment is agnostic to the hardware and hardware that meets the Open-Source Container Initiative, a General-Purpose Computing Platform (GPCP) will be developed. The Improved Data Modem (IDM), Remanufacture effort cannot incorporate the NGC2 requirements in time to mitigate obsolescence issues or meet the requirement to remove and replace the IDM 401 with the IDM OSR. Secondary Distribution Army Quantity Total Obligation Authority ANG Quantity Total Obligation Authority AR Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 8658AA0712 - Network And Mission Plan Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 31.234 28.428 17.797 - 17.797 20.662 17.856 22.177 32.172 - - - - - - - - - 16.558 13.612 10.349 - 10.349 13.399 11.582 14.385 20.867 - - - - - - - - - 2.070 1.432 1.089 - 1.089 1.410 1.219 1.514 2.197 - - - - - - - - - 49.862 43.472 29.235 - 29.235 35.471 30.657 38.076 55.236 UNCLASSIFIED Page 4 of 13 P-1 Line #21 Volume 1 - 140 === page 177 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 8658AA0712 / Network And Mission Plan Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: AH-64D/E, CH-47D/F, UH-60A/L/M/Q/V, HH-60L/M, EMARSS, UH-72, UAS Prior Years Financial Plan Modification Number / Title: AA0712 / Network And Mission Plan Modification Type: Rationalization, Standardization, Interoperability, Compatibility, Simplification FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 6: Aviation Mission Planning System (AMPS) B Kits Recurring Kit Quantity- (Computer) 7,780 / 33.247 ECPs - - / - / 185.293 - / 2.632 - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 7,780 / 33.247 / - - / - - / - - / - - / - - / - - / - - / - - / - - / 31.566 / 0.191 - / - / 0.191 - / - - / - - / - - / - - / - - / 19.346 / - - / - / - - / - - / - - / - - / - - / - - / 82.404 - / 26.381 - / 190.312 Systems Engineering - / 29.917 - / 1.649 System Test and Eval - / 17.775 - / 0.879 - / 0.501 Fielding/Training - / 79.680 - / 2.176 - / 0.548 Systems Engineering / Program Management - / 22.223 - / 1.131 - / 1.216 - / 1.811 - / - - / 1.811 - / - - / - - / - - / - - / - 7,780 / 368.135 - / 8.467 - / 4.652 - / 2.002 - / - - / 2.002 - / - - / - - / - - / - - / - 7,780 / 383.256 7,780 / 368.135 - / 8.467 - / 4.652 - / 2.002 - / - - / 2.002 - / - - / - - / - - / - - / - 7,780 / 383.256 5,781 / 160.424 Subtotal: Recurring Subtotal: Aviation Mission Planning System (AMPS) - / / 2.387 - - - Modification Item 2 of 6: Improved Data Modem B Kits Recurring Kit Quantity- IDM 5,781 / 160.424 Other- PM Admin - IDM - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 32.576 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 169.950 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Aircraft Integration - IDM - - System Test & Eval - IDM - / 75.547 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Systems Engineering - IDM - / 26.516 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 105.593 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - ECP (SW) - IDM - Kit Quantity - IDM OSR - / - Cybersecurity - IDM OSR - / - - / - - / 0.201 Other- PM Admin - IDM OSR - / - - / - - / 5.837 System Test & Eval - IDM OSR - / - - / 9.015 Systems Engineering - IDM OSR - / - - / 9.755 Subtotal: Recurring 5,781 / 570.606 10 / 1.232 10 / 20.002 50 / 8.197 - / - - / - - / 5.064 - / - - / 5.064 - / 5.009 - / 5.916 - / 5.348 - / 5.797 Continuing Continuing / 14.698 - / 1.884 - / - - / 1.884 - / 2.017 - / 2.058 - / 1.728 - / 1.973 Continuing Continuing / 6.486 - / 5.629 - / - - / 5.629 - / 6.165 - / 6.277 - / 5.292 - / 5.025 Continuing Continuing 121 / 25.865 - / - Continuing Continuing 50 / 35.419 - 185 / 19.923 / - 121 / 25.865 - 134 / 14.937 / - 185 / 33.114 - 204 / 23.229 / - 134 / 29.188 - 338 / 36.782 / - 204 / 35.597 - / - 338 / 49.577 Continuing / 26.516 / 105.593 - - 121 / 13.288 / 75.547 / - - 121 / 13.288 - / 32.576 / 169.950 - / - Continuing - / 0.201 Non-Recurring Fielding and Training - IDM - / 1.144 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1.144 Kit Quantity - IDM - / 9.776 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 9.776 / 0.428 - / - / 0.437 - / - - / - - / - - / - - / 1.982 IDM 401 ILS - IDM LI 8658AA0712 - Network And Mission Plan Army - / - - / 0.716 - / 0.401 - UNCLASSIFIED Page 5 of 13 - / 0.428 - P-1 Line #21 Volume 1 - 141 === page 178 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 8658AA0712 / Network And Mission Plan Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: AH-64D/E, CH-47D/F, UH-60A/L/M/Q/V, HH-60L/M, EMARSS, UH-72, UAS Prior Years Financial Plan Modification Type: Rationalization, Standardization, Interoperability, Compatibility, Simplification FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Fielding and Training - IDM OSR - Subtotal: Non-Recurring Subtotal: Improved Data Modem Modification Number / Title: AA0712 / Network And Mission Plan / - / 10.920 - 5,781 / 581.526 - / / 0.716 - 10 / 20.718 - / - - / 0.940 - / - - / 0.940 - / 1.920 - / 1.469 - / 2.479 - / 5.659 Continuing Continuing / 0.401 - / 1.368 - / - - / 1.368 - / 2.357 - / 1.469 - / 2.479 - / 5.659 Continuing Continuing 121 / 27.233 - / - 338 / 55.236 Continuing Continuing 50 / 35.820 121 / 27.233 185 / 35.471 134 / 30.657 204 / 38.076 Modification Item 3 of 6: Aviation Data Exploitation Capability (ADEC) B Kits Recurring Kit Quantity- Workstation 452 / 1.035 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Kit Quantity- Server 50 / 0.763 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 50 / 0.763 ECP (SW) - / 1.186 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1.186 Data - / 0.843 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.843 Systems Engineering - / 4.362 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 4.362 System Test & Eval - / 0.304 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.304 Fielding/Training - / 4.972 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 4.972 Other- PM Admin - / 7.170 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 7.170 502 / 20.635 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 502 / 20.635 502 / 20.635 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 502 / 20.635 - / 12.234 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.781 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 11.582 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Subtotal: Recurring Subtotal: Aviation Data Exploitation Capability (ADEC) 452 / 1.035 Modification Item 4 of 6: Aircraft Notebook (ACN) B Kits Recurring ECP (SW) Data Systems Engineering - System Test Fielding/Training - Other- PM Admin Subtotal: Recurring Subtotal: Aircraft Notebook (ACN) - / 1.849 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 43.430 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 12.234 - - / 0.781 / 11.582 - / 1.849 / 43.430 / 4.774 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 74.650 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - - / 74.650 / 4.774 - / 74.650 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 74.650 Modification Item 5 of 6: Aviation Mission Common Server (AMCS) B Kits Recurring LI 8658AA0712 - Network And Mission Plan Army UNCLASSIFIED Page 6 of 13 P-1 Line #21 Volume 1 - 142 === page 179 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 8658AA0712 / Network And Mission Plan Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: AH-64D/E, CH-47D/F, UH-60A/L/M/Q/V, HH-60L/M, EMARSS, UH-72, UAS Prior Years Financial Plan Modification Number / Title: AA0712 / Network And Mission Plan Modification Type: Rationalization, Standardization, Interoperability, Compatibility, Simplification FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) System Engineering - System Test and Evaluation / 30.731 - - / 9.142 / 11.555 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 9.122 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 24.992 / 20.677 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 76.420 - - / 42.286 - / 9.142 Other - PM Admin - / 15.870 Subtotal: Recurring - / 55.743 AMCS Aircraft Integration - / 13.697 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 13.697 AMCS SW App ECP - / 26.283 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 26.283 Subtotal: Non-Recurring - / 39.980 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - - / 95.723 / 20.677 - / - - / - - / - - / - - / - - / - - / - - / - - / - - Non-Recurring Subtotal: Aviation Mission Common Server (AMCS) - / 39.980 / 116.400 - Modification Item 6 of 6: Aviation Status Dashboard Congressional Add B Kits Non-Recurring Software Subtotal: Non-Recurring Subtotal: Aviation Status Dashboard Congressional Add Subtotal: Procurement, All Modification Items - / 0.750 - / - - / 3.000 - / - - / - - / - - / - - / - - / - - / - - / - - / 3.750 - / 0.750 - / - - / 3.000 - / - - / - - / - - / - - / - - / - - / - - / - - / 3.750 - / 0.750 - / - - / 3.000 - / - - / - - / - - / - - / - - / - - / - - / - - / 3.750 - / - 14,063 / 1,141.419 10 / 49.862 50 / 43.472 121 / 29.235 121 / 29.235 185 / 35.471 134 / 30.657 204 / 38.076 338 / 55.236 Continuing Continuing Installation Modification Item 3 of 6: Aviation Data Exploitation Capability (ADEC) 1/ - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1/ - Modification Item 4 of 6: Aircraft Notebook (ACN) 1/ - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1/ - Subtotal: Installation 2/ - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2/ - 55.236 Continuing Continuing Total Total Cost (Procurement + Support + Installation) LI 8658AA0712 - Network And Mission Plan Army 1,141.419 49.862 43.472 29.235 - UNCLASSIFIED Page 7 of 13 29.235 35.471 30.657 P-1 Line #21 38.076 Volume 1 - 143 === page 180 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 P-1 Line Item Number / Title: 8658AA0712 / Network And Mission Plan ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0712 / Network And Mission Plan MDAP/MAIS Code: Modification Item 1 of 6: Aviation Mission Planning System (AMPS) Manufacturer Information Manufacturer Name: Getac Manufacturer Location: Irvine, CA Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Not applicable LI 8658AA0712 - Network And Mission Plan Army Installation Quantity: 0 UNCLASSIFIED Page 8 of 13 P-1 Line #21 Volume 1 - 144 === page 181 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 P-1 Line Item Number / Title: 8658AA0712 / Network And Mission Plan ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0712 / Network And Mission Plan MDAP/MAIS Code: Modification Item 2 of 6: Improved Data Modem Manufacturer Information Manufacturer Name: DEVCOM S3I / North Atlantic Industries NAI Manufacturer Location: Redstone Arsenal, AL / Long Island NY Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): 9 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): NETT LI 8658AA0712 - Network And Mission Plan Army Installation Quantity: 0 UNCLASSIFIED Page 9 of 13 P-1 Line #21 Volume 1 - 145 === page 182 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 8658AA0712 / Network And Mission Plan Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0712 / Network And Mission Plan MDAP/MAIS Code: Modification Item 3 of 6: Aviation Data Exploitation Capability (ADEC) Manufacturer Information Manufacturer Name: AMRDEC Software Engineering Directorate Manufacturer Location: Redstone Arsenal, AL Administrative Leadtime (in Months): Dates Production Leadtime (in Months): FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Not Applicable Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 1 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.000 FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 1 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.000 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 Out 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 LI 8658AA0712 - Network And Mission Plan Army UNCLASSIFIED Page 10 of 13 P-1 Line #21 Volume 1 - 146 === page 183 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 8658AA0712 / Network And Mission Plan Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0712 / Network And Mission Plan MDAP/MAIS Code: Modification Item 4 of 6: Aircraft Notebook (ACN) Manufacturer Information Manufacturer Name: AMRDEC Software Engineering Directorate Manufacturer Location: Redstone Arsenal, AL Administrative Leadtime (in Months): Dates Production Leadtime (in Months): FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Not Applicable Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 1 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.000 FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 1 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.000 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 Out 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 LI 8658AA0712 - Network And Mission Plan Army UNCLASSIFIED Page 11 of 13 P-1 Line #21 Volume 1 - 147 === page 184 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 P-1 Line Item Number / Title: 8658AA0712 / Network And Mission Plan ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0712 / Network And Mission Plan MDAP/MAIS Code: Modification Item 5 of 6: Aviation Mission Common Server (AMCS) Manufacturer Information Manufacturer Name: Mercury Systems Manufacturer Location: Phoenix, AZ Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Product will not go into production LI 8658AA0712 - Network And Mission Plan Army Installation Quantity: 0 UNCLASSIFIED Page 12 of 13 P-1 Line #21 Volume 1 - 148 === page 185 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 P-1 Line Item Number / Title: 8658AA0712 / Network And Mission Plan ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0712 / Network And Mission Plan MDAP/MAIS Code: Modification Item 6 of 6: Aviation Status Dashboard Congressional Add Manufacturer Information Manufacturer Name: Lulius Innovation Inc Manufacturer Location: Reno NV Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Software Install LI 8658AA0712 - Network And Mission Plan Army Installation Quantity: 0 UNCLASSIFIED Page 13 of 13 P-1 Line #21 Volume 1 - 149 === page 186 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 8659AA0723 / Comms, Nav Surveillance Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0604201A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 1,342.909 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 1,342.909 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 1,342.909 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 61.362 11.566 14.384 - 14.384 12.796 13.766 13.652 - - - - - - - - 61.362 11.566 14.384 - 14.384 12.796 13.766 13.652 - - - - - - - - 61.362 11.566 14.384 - 14.384 12.796 13.766 13.652 To FY 2031 Complete - Total - 13.789 Continuing - Continuing - 13.789 Continuing - Continuing - - 13.789 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Funding for the Army Navigation Systems programs was realigned to the new Budget Line Item 8662A01006, Aviation Assured-Position, Navigation, and Timing (A-PNT) in FY 2021. Aviation Tactical Communication Systems (ATCS) program supports two of the Army's modernization priorities: Future Vertical Lift (FVL) and Network (Unified Network). ATCS procures, integrates, and fields AKits and B-Kits to meet Army Aviation's Command and Control (C2) requirements, including C2 Fix and Next Generation C2 (NGC2) capabilities. The current ATCS program, featuring the Multi-mode Aviation Radio Set (MARS) ARC-231A system, enables secure communication with DoW and multi-national forces through crypto-modernized algorithms and secure waveforms. The ARC-231A system is the primary Air Traffic Control communications radio, ensuring aircrew and passenger safety through reliable Air-to-Air Secure Communications and Air-to-Ground Communications. Within the C2 Fix architecture, it facilitates integration, deconfliction, and execution of airspace clearance, supporting Transformation in Contact (TiC) initiatives. The software-defined radio allows for rapid fielding and adaptability, keeping pace with Army modernization efforts. By leveraging these advanced communication capabilities, Army Aviation enhances operational effectiveness, improves situational awareness, and maintains a competitive edge in emerging threats. The Blue Force Tracking - 2 (BFT-2) contributes to two of the Army's modernization priorities: FVL and Network (Unified Network). BFT-2 is critical to C2 Fix Brigade and below providing a medium for C2 functions to be delivered via the Integrated Tactical Network. It provides deliberate FVL air-to-ground and air-to air messaging capabilities in a complex operational environment and enables position location information of FVL enabling integration of unmanned crew vehicles and air launched effects in a large-scale combat operational environment. BFT-2 also provides the commander a near real-time Beyond-Lineof-Sight Blue/Red Situational Awareness picture. The Unified Network underpins the Army's efforts to transform and reimagine command and control and is the capability that delivers the resilient and secure communications to ensure that aviation assets have secure access to information. Secondary Distribution Army Quantity Total Obligation Authority ANG Quantity Total Obligation Authority AR Quantity LI 8659AA0723 - Comms, Nav Surveillance Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 33.822 5.783 7.192 - 7.192 6.436 6.923 6.866 6.935 - - - - - - - - - 24.480 4.626 5.754 - 5.754 5.088 5.474 5.429 5.483 - - - - - - - - - UNCLASSIFIED Page 1 of 20 P-1 Line #22 Volume 1 - 150 === page 187 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 8659AA0723 / Comms, Nav Surveillance Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0604201A Line Item MDAP/MAIS Code: N/A Secondary Distribution Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 8659AA0723 - Comms, Nav Surveillance Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 3.060 1.157 1.438 - 1.438 1.272 1.369 1.357 - - - - - - - - - 61.362 11.566 14.384 - 14.384 12.796 13.766 13.652 13.789 UNCLASSIFIED Page 2 of 20 P-1 Line #22 1.371 Volume 1 - 151 === page 188 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 8659AA0723 / Comms, Nav Surveillance Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: 0604201A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a AA0723 / Comms, Nav Surveillance (New or Improved Operational Capability) - / 1,342.909 - / 61.362 - / 11.566 - / 14.384 - / - - P-40 Total Gross/Weapon System Cost - / 1,342.909 - / 61.362 - / 11.566 - / 14.384 - / - - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code / 14.384 / 14.384 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Continuing Continuing Continuing Continuing P-3a AA0723 / Comms, Nav Surveillance (New or Improved Operational Capability) - / 12.796 - / 13.766 - / 13.652 - / 13.789 P-40 Total Gross/Weapon System Cost - / 12.796 - / 13.766 - / 13.652 - / 13.789 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Funding supports the requirements for ARC-231A radio procurement and aircraft modification requirements, fielding and essential system test and evaluation as well as critical software integration efforts to support crypto-modernization. FY 2026 to FY 2027 funding increased to support hardware and software integration to include certification/qualification testing requirements. In accordance with section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110 - 181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 8659AA0723 - Comms, Nav Surveillance Army UNCLASSIFIED Page 3 of 20 P-1 Line #22 Volume 1 - 152 === page 189 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 8659AA0723 / Comms, Nav Surveillance Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: AA0723 / Comms, Nav Surveillance MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 1,342.909 1,342.909 1,342.909 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 61.362 11.566 14.384 - 14.384 12.796 13.766 13.652 - - - - - - - - 61.362 11.566 14.384 - 14.384 12.796 13.766 13.652 - - - - - - - - 61.362 11.566 14.384 - 14.384 12.796 13.766 13.652 To FY 2031 Complete - Total - 13.789 Continuing - Continuing - 13.789 Continuing - Continuing - - 13.789 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Funding for the Army Navigation Systems programs was realigned to the new Budget Line Item 8662A01006, Aviation Assured-Position, Navigation, and Timing (A-PNT) in FY 2021. Aviation Tactical Communication Systems (ATCS) program supports two of the Army's modernization priorities: Future Vertical Lift (FVL) and Network (Unified Network). ATCS procures, integrates, and fields AKits and B-Kits to meet Army Aviation's Command and Control (C2) requirements, including C2 Fix and Next Generation C2 (NGC2) capabilities. The current ATCS program, featuring the Multi-mode Aviation Radio Set (MARS) ARC-231A system, enables secure communication with DoW and multi-national forces through crypto-modernized algorithms and secure waveforms. The ARC-231A system is the primary Air Traffic Control communications radio, ensuring aircrew and passenger safety through reliable Air to Air Secure Communications and Air to Ground Communications. Within the C2 Fix architecture, it facilitates integration, deconfliction, and execution of airspace clearance, supporting Transformation in Contact (TiC) initiatives. The software-defined radio allows for rapid fielding and adaptability, keeping pace with Army modernization efforts. By leveraging these advanced communication capabilities, Army Aviation enhances operational effectiveness, improves situational awareness, and maintains a competitive edge in emerging threats. The Blue Force Tracking - 2 (BFT-2) contributes to two of the Army's modernization priorities: FVL and Network (Unified Network). BFT-2 is critical to C2 Fix Brigade and below providing a medium for C2 functions to be delivered via the Integrated Tactical Network. It provides deliberate FVL air-to-ground and air-to air messaging capabilities in a complex operational environment and enables position location information of FVL enabling integration of unmanned crew vehicles and air launched effects in a large-scale combat operational environment. BFT-2 also provides the commander a near real-time Beyond-Lineof-Sight Blue/Red Situational Awareness Picture. The Unified Network underpins the Army's efforts to transform and reimagine command and control and is the capability that delivers the resilient and secure communications to ensure that aviation assets have secure access to information. Secondary Distribution Army Quantity Total Obligation Authority ANG Quantity Total Obligation Authority AR Quantity Total Obligation Authority Total: Quantity LI 8659AA0723 - Comms, Nav Surveillance Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 33.822 5.783 7.192 - 7.192 6.436 6.923 6.866 6.935 - - - - - - - - - 24.480 4.626 5.754 - 5.754 5.088 5.474 5.429 5.483 - - - - - - - - - 3.060 1.157 1.438 - 1.438 1.272 1.369 1.357 1.371 - - - - - - - - - UNCLASSIFIED Page 4 of 20 P-1 Line #22 Volume 1 - 153 === page 190 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 P-1 Line Item Number / Title: 8659AA0723 / Comms, Nav Surveillance ID Code (A=Service Ready, B=Not Service Ready) : Secondary Distribution Secondary Distribution Total Obligation Authority LI 8659AA0723 - Comms, Nav Surveillance Army Modification Number / Title: AA0723 / Comms, Nav Surveillance MDAP/MAIS Code: FY 2025 61.362 FY 2026 11.566 FY 2027 Base FY 2027 OOC 14.384 UNCLASSIFIED Page 5 of 20 FY 2027 Total - FY 2028 14.384 12.796 P-1 Line #22 FY 2029 13.766 FY 2030 FY 2031 13.652 13.789 Volume 1 - 154 === page 191 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 8659AA0723 / Comms, Nav Surveillance Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: UH/HH-60A/L, UH/HH/ MH-60M, CH-47D, CH/MH-47F, AH-64D/E, LUH, UAS Prior Years Financial Plan Modification Number / Title: AA0723 / Comms, Nav Surveillance Modification Type: New or Improved Operational Capability FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 9: DGNS (AN/ASN-128D) P3I A Kits Recurring Engineering Change Orders - / 2.800 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 2.800 Data - / 1.712 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1.712 Training Equipment 46 / 6.800 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 46 / 6.800 Systems Engineering - / 8.930 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 8.930 Other - PM Admin - / 1.500 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1.500 46 / 21.742 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 46 / 21.742 46 / 21.742 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 46 / 21.742 450 / 29.759 450 / 29.759 Subtotal: Recurring Subtotal: DGNS (AN/ASN-128D) P3I Modification Item 2 of 9: DGNS (AN/ASN-128D) CDU/ SW Upgrade ECP B-Kit B Kits Recurring Upgraded CDU - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Fielding - / 9.836 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 9.836 Systems Eng / Program Management - / 7.967 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 7.967 450 / 47.562 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Subtotal: Recurring 450 / 47.562 Non-Recurring Data / Training Aircraft Integration - Systems Test & Evaluation - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 3.349 / 12.335 / 5.078 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 20.762 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - 450 / 68.324 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 450 / 68.324 GPS Anti Jam Antenna 235 / 7.748 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 235 / 7.748 Systems Engineering / Program Management - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Subtotal: Non-Recurring Subtotal: DGNS (AN/ASN-128D) CDU/SW Upgrade ECP B-Kit - / 3.349 / 12.335 - - / 5.078 / 20.762 Modification Item 3 of 9: DGNS (AN/ASN-128D) CDU/ SW Upgrade ECP A-Kit A Kits Recurring LI 8659AA0723 - Comms, Nav Surveillance Army / 2.430 UNCLASSIFIED Page 6 of 20 P-1 Line #22 / 2.430 Volume 1 - 155 === page 192 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 8659AA0723 / Comms, Nav Surveillance Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: UH/HH-60A/L, UH/HH/ MH-60M, CH-47D, CH/MH-47F, AH-64D/E, LUH, UAS Prior Years Financial Plan Modification Number / Title: AA0723 / Comms, Nav Surveillance Modification Type: New or Improved Operational Capability FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Systems Test & Evaluation Subtotal: Recurring / 3.930 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 235 / 14.108 - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 3.930 235 / 14.108 Non-Recurring Integration & NRE - / 1.002 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1.002 - / 1.002 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1.002 235 / 15.110 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 235 / 15.110 EGI EAGLE-M Shipsets 131 / 23.001 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 131 / 23.001 EGI EAGLE SOA Shipsets 51 / 8.493 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 51 / 8.493 Fielding - / 1.365 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 23.011 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - 182 / 55.870 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 182 / 55.870 - - Subtotal: Non-Recurring Subtotal: DGNS (AN/ASN-128D) CDU/SW Upgrade ECP A-Kit Modification Item 4 of 9: Embedded GPS Inertial Nav System (EGI) P3I B-Kit B Kits Recurring Systems Engineering / Program Management Subtotal: Recurring - / 1.365 / 23.011 Non-Recurring Aircraft Integration / 10.211 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Systems Test & Evaluation - / 7.853 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Training / Data / Support Equipment - / 3.553 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 21.617 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - 182 / 77.487 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 182 / 77.487 153 / 11.722 153 / 11.722 Subtotal: Non-Recurring Subtotal: Embedded GPS Inertial Nav System (EGI) P3I B-Kit - / 10.211 / 7.853 / 3.553 / 21.617 Modification Item 5 of 9: Embedded GPS Inertial Nav System (EGI) P3I A-Kit A Kits Recurring GPS Anti Jam Antenna - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 5.389 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 153 / 17.111 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 153 / 17.111 - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Systems Engineering / Program Management Subtotal: Recurring - - / 5.389 Non-Recurring Aircraft Integration LI 8659AA0723 - Comms, Nav Surveillance Army / 46.145 UNCLASSIFIED Page 7 of 20 P-1 Line #22 / 46.145 Volume 1 - 156 === page 193 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 8659AA0723 / Comms, Nav Surveillance Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: UH/HH-60A/L, UH/HH/ MH-60M, CH-47D, CH/MH-47F, AH-64D/E, LUH, UAS Prior Years Financial Plan Modification Number / Title: AA0723 / Comms, Nav Surveillance Modification Type: New or Improved Operational Capability FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Systems Test & Evaluation - / 5.837 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Productionization - / 2.074 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 54.056 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - 153 / 71.167 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 153 / 71.167 Kit Quantity-A-Kit 415 / 12.956 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 415 / 12.956 Systems Engineering / Program Management - / 46.417 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - System Test & Evaluation - / 10.107 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1.366 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 16.922 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - 415 / 87.768 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 415 / 87.768 - / 95.887 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 95.887 - / 95.887 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 95.887 Kit Quantity-B-Kit (ARC-231) Shipsets 1,230 / 185.502 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Kit Quantity-B-Kit (ARC201D) Shipsets 777 / 46.465 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 777 / 46.465 2,007 / 231.967 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2,007 / 231.967 2,422 / 415.622 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2,422 / 415.622 Subtotal: Non-Recurring - Subtotal: Embedded GPS Inertial Nav System (EGI) P3I A-Kit / 5.837 / 2.074 / 54.056 Modification Item 6 of 9: Aviation Tactical Comm Systems (ATCS) - Alt Comms A Kits Recurring Training / Data / Support Equipment - Fielding - Subtotal: Recurring / 46.417 / 10.107 - / 1.366 / 16.922 Non-Recurring Aircraft Integration Subtotal: Non-Recurring B Kits Recurring Subtotal: Recurring Subtotal: Aviation Tactical Comm Systems (ATCS) - Alt Comms 1,230 / 185.502 Modification Item 7 of 9: Aviation Tactical Comm Systems (ATCS) - MARS A Kits Recurring Systems Engineering / Program Management - / 78.228 System Test & Evaluation - / 23.053 Subtotal: Recurring LI 8659AA0723 - Comms, Nav Surveillance Army - / 101.281 - / 10.707 - / 2.154 - / 2.955 - / - - / 2.955 - / 2.514 - / 2.906 / 5.683 - / 1.064 - / 4.074 - / - - / 4.074 - / 1.418 - / 1.446 / 16.390 - / 3.218 - / 7.029 - / - - / 7.029 - / 3.932 - / 4.352 UNCLASSIFIED Page 8 of 20 P-1 Line #22 - / 2.846 - / 2.791 Continuing Continuing / - - / 1.505 Continuing Continuing / 2.846 - / 4.296 Continuing Continuing Volume 1 - 157 === page 194 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 8659AA0723 / Comms, Nav Surveillance Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: UH/HH-60A/L, UH/HH/ MH-60M, CH-47D, CH/MH-47F, AH-64D/E, LUH, UAS Prior Years Financial Plan Modification Number / Title: AA0723 / Comms, Nav Surveillance Modification Type: New or Improved Operational Capability FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Non-Recurring SINCGARS NRE / 2.327 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - - / 39.012 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 39.012 - / 41.339 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 41.339 Kit Shipset B-Kit (ARC-231A) - PIM 26 / 5.408 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 26 / 5.408 Kit Shipset B-Kit (ARC 231) - Rotable 428 / 55.765 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 428 / 55.765 Kit Shipset B-Kit (ARC-231A) - AMAM 1,918 / 115.495 10 / 2.819 10 / 2.924 - / - 10 / 2.924 10 / 3.115 10 / 3.293 10 / 3.482 10 / 3.681 Continuing Continuing - / 1.548 - / 1.250 - / - - / 1.250 - / 2.746 - - - Continuing Continuing / - - / 0.865 - / - - / 0.865 - / 0.830 / 3.586 - / 1.636 - / - - / 1.636 - / 1.874 10 / 7.953 10 / 6.675 - / - 10 / 6.675 10 / 8.565 10 / 9.004 Aircraft Integration Subtotal: Non-Recurring - / 2.327 B Kits Recurring Fielding - Training/Data - Software Change Product Subtotal: Recurring - 381 / 41.982 / 12.645 - / 1.988 / 0.900 - / 0.252 / 32.521 - / 0.750 2,372 / 222.734 381 / 44.972 - / 2.918 - - / / 2.793 / 3.042 - - / / 2.975 / 3.174 - - / - - / - - / 2.847 / 0.710 Continuing Continuing 10 / 9.499 10 / 7.565 Continuing Continuing Non-Recurring ECP - Non-Recurring - / 57.275 - / - - / 0.125 - / 0.680 - / - - / 0.680 - / 0.299 - / 0.410 - / 1.307 - / 1.905 Continuing Continuing Subtotal: Non-Recurring - / 57.275 - / - - / 0.125 - / 0.680 - / - - / 0.680 - / 0.299 - / 0.410 - / 1.307 - / 1.905 Continuing Continuing 10 / 14.384 - / - 10 / 14.384 10 / 13.766 Continuing Continuing Subtotal: Aviation Tactical Comm Systems (ATCS) MARS 2,372 / 422.629 381 / 61.362 10 / 11.296 10 / 12.796 10 / 13.766 10 / 13.652 Modification Item 8 of 9: Airborne Maritime Fixed (AMF-A) Radio Integration A Kits Recurring Kit Quantity - A-Kit - Production Line - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Support Equipment - / 2.030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - System Test and Evaluation - / 1.910 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 12.074 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - 148 / 29.480 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 148 / 29.480 NRE Aircraft Integration - / 18.594 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 18.594 Subtotal: Non-Recurring - / 18.594 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 18.594 148 / 48.074 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 148 / 48.074 System Eng/Prog Mgmt (SEPM) Subtotal: Recurring 148 / 13.466 - 148 / 13.466 / 2.030 / 1.910 / 12.074 Non-Recurring Subtotal: Airborne Maritime Fixed (AMF-A) Radio Integration LI 8659AA0723 - Comms, Nav Surveillance Army UNCLASSIFIED Page 9 of 20 P-1 Line #22 Volume 1 - 158 === page 195 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 8659AA0723 / Comms, Nav Surveillance Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: UH/HH-60A/L, UH/HH/ MH-60M, CH-47D, CH/MH-47F, AH-64D/E, LUH, UAS Prior Years Financial Plan Modification Number / Title: AA0723 / Comms, Nav Surveillance Modification Type: New or Improved Operational Capability FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Modification Item 9 of 9: Blue Force Tracking-Aviation (BFT-A) A Kits Recurring BFT-A A-Kits (MWO) 2,459 / 29.153 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - BFT-A A Kit Spares 25 / 0.270 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 25 / 0.270 Test / Engineering - / 4.518 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Fielding / Training - / 4.884 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 40.222 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 3.924 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2,484 / 82.971 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Systems Engineering / Program Management Misc HW Procurement Subtotal: Recurring - 2,459 / 29.153 - / 4.518 / 4.884 / 40.222 - / 3.924 2,484 / 82.971 Non-Recurring NRE-Test / Engineering - / 4.747 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 4.747 Subtotal: Non-Recurring - / 4.747 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 4.747 2,484 / 87.718 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Subtotal: Blue Force Tracking-Aviation (BFT-A) Subtotal: Procurement, All Modification Items 8,492 / 1,227.873 381 / 61.362 10 / 11.296 10 / 14.384 10 / 14.384 10 / 12.796 10 / 13.766 10 / 13.652 10 / 13.766 Continuing 2,484 / 87.718 Continuing Installation Modification Item 1 of 9: DGNS (AN/ASN-128D) P3I 46 / 0.296 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 46 / 0.296 Modification Item 2 of 9: DGNS (AN/ASN-128D) CDU/ SW Upgrade ECP B-Kit 450 / 4.070 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 450 / 4.070 Modification Item 3 of 9: DGNS (AN/ASN-128D) CDU/ SW Upgrade ECP A-Kit 235 / 1.260 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 235 / 1.260 Modification Item 4 of 9: Embedded GPS Inertial Nav System (EGI) P3I B-Kit 51 / 0.447 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 51 / 0.447 Modification Item 5 of 9: Embedded GPS Inertial Nav System (EGI) P3I A-Kit 153 / 0.551 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 153 / 0.551 Modification Item 6 of 9: Aviation Tactical Comm Systems (ATCS) - Alt Comms 415 / 19.416 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 415 / 19.416 Modification Item 7 of 9: Aviation Tactical Comm Systems (ATCS) - MARS 1,237 / 3.283 - / - - / - - / - - / - - / - - / - - / - 10 / 0.023 3,995 / 11.234 5,375 / 14.810 Modification Item 9 of 9: Blue Force Tracking-Aviation (BFT-A) 2,459 / 85.713 - / - - / - - / - - / - - / - - / - - / - - 2,459 / 85.713 LI 8659AA0723 - Comms, Nav Surveillance Army 133 / 0.270 - / - UNCLASSIFIED Page 10 of 20 P-1 Line #22 - / - / - Volume 1 - 159 === page 196 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 8659AA0723 / Comms, Nav Surveillance Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: UH/HH-60A/L, UH/HH/ MH-60M, CH-47D, CH/MH-47F, AH-64D/E, LUH, UAS Prior Years Financial Plan Modification Number / Title: AA0723 / Comms, Nav Surveillance Modification Type: New or Improved Operational Capability FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Subtotal: Installation 5,046 / 115.036 - / - 133 / 0.270 - / - - / - - / - - / - - / - - / - 10 / 0.023 13.652 13.789 3,995 / 11.234 9,184 / 126.563 Total Total Cost (Procurement + Support + Installation) LI 8659AA0723 - Comms, Nav Surveillance Army 1,342.909 61.362 11.566 14.384 - UNCLASSIFIED Page 11 of 20 14.384 12.796 13.766 P-1 Line #22 Continuing Continuing Volume 1 - 160 === page 197 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 8659AA0723 / Comms, Nav Surveillance Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0723 / Comms, Nav Surveillance MDAP/MAIS Code: Modification Item 1 of 9: DGNS (AN/ASN-128D) P3I Manufacturer Information Manufacturer Name: BAE International Incorporated Manufacturer Location: Wayne, NJ Administrative Leadtime (in Months): Dates Production Leadtime (in Months): FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Prototype Assets Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 46 / 0.296 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 46 / 0.296 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 46 / 0.296 46 / 0.296 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 46 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 46 Out 46 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 46 LI 8659AA0723 - Comms, Nav Surveillance Army UNCLASSIFIED Page 12 of 20 P-1 Line #22 Volume 1 - 161 === page 198 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 8659AA0723 / Comms, Nav Surveillance Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0723 / Comms, Nav Surveillance MDAP/MAIS Code: Modification Item 2 of 9: DGNS (AN/ASN-128D) CDU/SW Upgrade ECP B-Kit Manufacturer Information Manufacturer Name: BAE International Incorporated Manufacturer Location: Wayne, NJ Administrative Leadtime (in Months): 2 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Modification Work Order (MWO) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 450 / 4.070 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 450 / 4.070 450 / 4.070 450 / 4.070 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 450 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 450 Out 450 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 450 LI 8659AA0723 - Comms, Nav Surveillance Army UNCLASSIFIED Page 13 of 20 P-1 Line #22 Volume 1 - 162 === page 199 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 8659AA0723 / Comms, Nav Surveillance Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0723 / Comms, Nav Surveillance MDAP/MAIS Code: Modification Item 3 of 9: DGNS (AN/ASN-128D) CDU/SW Upgrade ECP A-Kit Manufacturer Information Manufacturer Name: Mayflower Communications, Inc. Manufacturer Location: Boston, MA Administrative Leadtime (in Months): 2 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: MWO Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 235 / 1.260 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 235 / 1.260 235 / 1.260 235 / 1.260 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 235 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 235 Out 235 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 235 LI 8659AA0723 - Comms, Nav Surveillance Army UNCLASSIFIED Page 14 of 20 P-1 Line #22 Volume 1 - 163 === page 200 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 8659AA0723 / Comms, Nav Surveillance Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0723 / Comms, Nav Surveillance MDAP/MAIS Code: Modification Item 4 of 9: Embedded GPS Inertial Nav System (EGI) P3I B-Kit Manufacturer Information Manufacturer Name: Honeywell, Incorporated Manufacturer Location: Clearwater, FL Administrative Leadtime (in Months): 2 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: MWO Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 51 / 0.447 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 51 / 0.447 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 51 / 0.447 51 / 0.447 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 51 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 51 Out 51 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 51 LI 8659AA0723 - Comms, Nav Surveillance Army UNCLASSIFIED Page 15 of 20 P-1 Line #22 Volume 1 - 164 === page 201 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 8659AA0723 / Comms, Nav Surveillance Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0723 / Comms, Nav Surveillance MDAP/MAIS Code: Modification Item 5 of 9: Embedded GPS Inertial Nav System (EGI) P3I A-Kit Manufacturer Information Manufacturer Name: Honeywell, Incorporated Manufacturer Location: Clearwater, FL Administrative Leadtime (in Months): 2 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: MWO Installation Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 153 / 0.551 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 153 / 0.551 153 / 0.551 153 / 0.551 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 153 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 153 Out 153 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 153 LI 8659AA0723 - Comms, Nav Surveillance Army UNCLASSIFIED Page 16 of 20 P-1 Line #22 Volume 1 - 165 === page 202 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 8659AA0723 / Comms, Nav Surveillance Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0723 / Comms, Nav Surveillance MDAP/MAIS Code: Modification Item 6 of 9: Aviation Tactical Comm Systems (ATCS) - Alt Comms Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 2 Dates Production Leadtime (in Months): 10 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Modification Work Order (MWO) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 415 / 19.416 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 415 / 19.416 415 / 19.416 415 / 19.416 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 415 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 415 Out 415 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 415 LI 8659AA0723 - Comms, Nav Surveillance Army UNCLASSIFIED Page 17 of 20 P-1 Line #22 Volume 1 - 166 === page 203 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 8659AA0723 / Comms, Nav Surveillance Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0723 / Comms, Nav Surveillance MDAP/MAIS Code: Modification Item 7 of 9: Aviation Tactical Comm Systems (ATCS) - MARS Manufacturer Information Manufacturer Name: BAE Systems Manufacturer Location: Largo, FL / FT Wayne IN Administrative Leadtime (in Months): 1 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 Contract Dates Aug 2025 Mar 2026 Mar 2027 Mar 2028 Mar 2029 Mar 2030 FY 2031 Delivery Dates Sep 2026 Feb 2027 Feb 2028 Feb 2029 Feb 2030 Feb 2031 Installation Information Method of Implementation: Equipment Swap Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 1,237 / 3.283 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 10 / 0.023 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete Total 1,237 / 3.283 133 / 0.270 133 / 0.270 - 1,237 / 3.283 - / - 133 / 0.270 10 / 0.023 / - 3,995 / 11.234 3,995 / 11.234 10 / 0.023 3,995 / 11.234 5,375 / 14.810 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC In 1,498 - - - 420 34 33 33 33 - 10 - - - 10 - - - 10 - - - 10 - - - 10 - - 2,363 4,464 Out 1,440 58 - - - 105 34 33 33 185 - 10 - - - 10 - - - 10 - - - 10 - - - 10 - 2,526 4,464 LI 8659AA0723 - Comms, Nav Surveillance Army UNCLASSIFIED Page 18 of 20 P-1 Line #22 Tot Volume 1 - 167 === page 204 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 P-1 Line Item Number / Title: 8659AA0723 / Comms, Nav Surveillance ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0723 / Comms, Nav Surveillance MDAP/MAIS Code: Modification Item 8 of 9: Airborne Maritime Fixed (AMF-A) Radio Integration Manufacturer Information Manufacturer Name: TBD Manufacturer Location: TBD Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Modification Work Order (MWO) - Contractor LI 8659AA0723 - Comms, Nav Surveillance Army Installation Quantity: 0 UNCLASSIFIED Page 19 of 20 P-1 Line #22 Volume 1 - 168 === page 205 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 8659AA0723 / Comms, Nav Surveillance Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: AA0723 / Comms, Nav Surveillance MDAP/MAIS Code: Modification Item 9 of 9: Blue Force Tracking-Aviation (BFT-A) Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 1 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Modification Work Order (MWO) - Contractor Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 2,459 / 85.713 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2,459 / 85.713 FY 2025 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 0 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2,459 / 85.713 Total 2,459 / 85.713 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 2,459 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2,459 Out 2,459 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2,459 LI 8659AA0723 - Comms, Nav Surveillance Army UNCLASSIFIED Page 20 of 20 P-1 Line #22 Volume 1 - 169 === page 206 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 8660A00713 / Degraded Visual Environment Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - 99.532 3.839 33.000 - - - - - - - - Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) - - - - - - - - - - - 99.532 3.839 33.000 - - - - - - - - Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) To FY 2031 Complete - - - - - - - - - - - 99.532 3.839 33.000 - - - - - - - - Total 136.371 136.371 136.371 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Army's current Degraded Visual Environment (DVE) solution is the Degraded Visual Environment Pilotage System (DVEPS). DVEPS provides the aircrew with a visual representation of the physical environment forward of the aircraft (A/C) through a multi-sensor, fused image of terrain and obstacles for hazard avoidance in austere conditions during all phases of flight. DVE Directed Requirement (DR) #1 (signed 2017): A joint effort between PEO AVN and SOCOM that fielded DVEPS to 15 HH-60M A/C. DVE DR #1 provided aviators with a visual representation of the physical environment forward of the A/C during take-off and landing in brown out conditions. A/C were fielded in FY 2021 and continue to collect flight data to inform reliability, availability and maintainability analysis to evaluate and optimize asset performance. DVE Inc 1 Abbreviated Capability Development Document (A-CDD) (signed 2022): Will enable rapid prototype delivery of enhanced DVE, Modular Open Systems Approach (MOSA) and Future Airborne Capability Environment (FACE) compliant systems for the enduring fleet while informing system development requirements for the future fleet (Future Long-Range Assault Aircraft). Transformation in Contract (TiC) 2.0 EXORD FRAGO 3 (signed 2025): Requires the integration of DVEPS into 12 UH-60M A/C from the 101st Airborne Division. This effort is resourced with the remaining funding after the cancellation of the Helmet Display and Tracking System/Long-Wave Infrared Directed Requirement. Secondary Distribution Army Quantity Total: Secondary Distribution FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 3.839 30.000 - - - - - - - Quantity - - - - - - - - - Total Obligation Authority - 3.000 - - - - - - - Quantity - - - - - - - - - 3.839 33.000 - - - - - - - Total Obligation Authority ANG FY 2025 Total Obligation Authority LI 8660A00713 - Degraded Visual Environment Army UNCLASSIFIED Page 1 of 2 P-1 Line #23 Volume 1 - 170 === page 207 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 8660A00713 / Degraded Visual Environment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Justification: No FY 2027 Request for Degraded Visual Environment. LI 8660A00713 - Degraded Visual Environment Army UNCLASSIFIED Page 2 of 2 P-1 Line #23 Volume 1 - 171 === page 208 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 8662A01006 / Aviation ASSURED PNT Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 233.048 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 233.048 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 233.048 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 69.161 49.475 55.055 - 55.055 54.886 53.922 53.597 - - - - - - - - 69.161 49.475 55.055 - 55.055 54.886 53.922 53.597 - - - - - - - - 69.161 49.475 55.055 - 55.055 54.886 53.922 53.597 To FY 2031 Complete - Total - 54.134 Continuing - Continuing - 54.134 Continuing - Continuing - - 54.134 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 143.238 220.258 377.672 154.649 - 154.649 354.103 247.349 190.737 241.670 Continuing Continuing Description: Assured-Position, Navigation, and Timing (A-PNT) provides Army Aviation with unhindered access to trusted Position, Navigation, and Timing (PNT) information within contested environments. To meet near term A-PNT modernization requirements, Army Aviation is currently pursuing critical near-term capabilities for the enduring fleet. A-PNT will enable aircrews to access and trust PNT information required to conduct PNT dependent tasks and ultimately provide alternate, contingency, or emergency PNT solutions to allow the aircrew to complete the mission or recover safely. To provide the most robust solution, platform level A-PNT includes layers of assurance such as modernized Global Positioning System (GPS) receivers, improved resiliency functions in GPS receivers, navigation equipment, and anti-jam antenna systems. Alternate PNT (ALT-PNT) capabilities (non-GPS) and/or complimentary PNT solutions will be evaluated and implemented into the Embedded GPS Inertial Navigation System (EGI)/Enhanced Aviation Global air-traffic management (GATM) Localizer Performance with Vertical Guidance (LPV) EGI (EAGLE)/EAGLE-M as standalone or blended navigation functions. The implementation will be configurable to accept position, velocity, and time measurements from other PNT solutions. EAGLE-M integration and procurement introduces the capability to receive and process the new military code (M-Code) GPS signal security, significantly enhancing A-PNT capability. It supports the requirement to maintain A-PNT throughout operations and requires assessment and follow-on upgrade to the EGI navigation system. EAGLE-M will support future capabilities such as ALT-PNT and additional system upgrades enabling Multi-Domain Operations (MDO) in contested GPS environments. EAGLE-M enables LPV allowing precision navigation and approach capabilities in the national airspace. The Multi-platform Anti-jam GPS Navigation Antenna (MAGNA) integration and procurement introduces a GPS anti-jam adaptive antenna system capability that receives legacy and modernized GPS satellite signals. The MAGNA reduces the effect of GPS jamming by rejecting the interfering signals before they disrupt the GPS receiver enabling the Warfighter continued access to GPS-provided PNT in a GPS degraded environment. This exhibit is for a budget line that procures multiple items and does not have a single Army Acquisition Objective. Secondary Distribution Army Quantity Total Obligation Authority ANG Quantity LI 8662A01006 - Aviation ASSURED PNT Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 41.497 27.211 30.281 - 30.281 30.334 29.799 29.619 29.916 - - - - - - - - - UNCLASSIFIED Page 1 of 10 P-1 Line #24 Volume 1 - 172 === page 209 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 8662A01006 / Aviation ASSURED PNT Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Secondary Distribution Total Obligation Authority AR Total: Secondary Distribution FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 27.664 19.790 22.022 - 22.022 21.824 21.443 21.314 Quantity - - - - - - - - - Total Obligation Authority - 2.474 2.752 - 2.752 2.728 2.680 2.664 2.691 Quantity Total Obligation Authority LI 8662A01006 - Aviation ASSURED PNT Army 21.527 - - - - - - - - - 69.161 49.475 55.055 - 55.055 54.886 53.922 53.597 54.134 UNCLASSIFIED Page 2 of 10 P-1 Line #24 Volume 1 - 173 === page 210 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 8662A01006 / Aviation ASSURED PNT Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a A01006 / Aviation ASSURED PNT (New or Improved Operational Capability) - / 233.048 - / 69.161 - / 49.475 - / 55.055 - / - - P-40 Total Gross/Weapon System Cost - / 233.048 - / 69.161 - / 49.475 - / 55.055 - / - - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code / 55.055 / 55.055 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Continuing Continuing Continuing Continuing P-3a A01006 / Aviation ASSURED PNT (New or Improved Operational Capability) - / 54.886 - / 53.922 - / 53.597 - / 54.134 P-40 Total Gross/Weapon System Cost - / 54.886 - / 53.922 - / 53.597 - / 54.134 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding supports procurement of MAGNA-GPS Anti Jam antennas, Embedded GPS Inertial Navigation System (EGI) EAGLE-M B Kits, aircraft integration and system evaluation into air vehicles. The EAGLE-M product line is procured in three core baseline configurations. These EAGLE-M configurations vary in cost based on system capabilities and enhanced air vehicle functionality. Subject to funding availability, this line also supports the procurement of EAGLE-M retrofit kits. The retrofit kit acquisition approach enables recurring realized cost savings, which aids in the procurement of increased EAGLE-M quantities. The MAGNA funds A-kit/B-Kit procurement and integration for this product which varies in cost by platform type, due to individual platform requirements. Costs for MAGNA B Kits are based on the quantities being procured. In accordance with Section 913 of the FY 2011 National Defense Authorization Act (P.L. 111-383), DoW limits the use of funds for purchasing GPS user equipment beyond FY 2017 unless the equipment is capable of receiving M-Code. FY 2026 to FY 2027 funding increase reflects the increase in procurement of MAGNA A-kits and B-kits and the associated installation cost of those units in support of platform requirements. LI 8662A01006 - Aviation ASSURED PNT Army UNCLASSIFIED Page 3 of 10 P-1 Line #24 Volume 1 - 174 === page 211 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 8662A01006 / Aviation ASSURED PNT Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Resource Summary Modification Number / Title: A01006 / Aviation ASSURED PNT MDAP/MAIS Code: Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 233.048 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 233.048 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 233.048 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 69.161 49.475 55.055 - 55.055 54.886 53.922 53.597 - - - - - - - - 69.161 49.475 55.055 - 55.055 54.886 53.922 53.597 - - - - - - - - 69.161 49.475 55.055 - 55.055 54.886 53.922 53.597 To FY 2031 Complete - Total - 54.134 Continuing - Continuing - 54.134 Continuing - Continuing - - 54.134 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) 143.238 - - 220.258 - 377.672 - 154.649 - - 154.649 - - 354.103 - 247.349 - 190.737 - 241.670 Continuing Continuing Description: Assured-Position, Navigation, and Timing (A-PNT) provides Army aviation with unhindered access to trusted Position, Navigation, and Timing (PNT) information within contested environments. To meet near term A-PNT modernization requirements, Army Aviation is currently pursuing critical near-term capabilities for the enduring fleet. A-PNT will enable aircrews to access and trust PNT information required to conduct PNT dependent tasks and ultimately provide alternate, contingency, or emergency PNT solutions to allow the aircrew to complete the mission or recover safely. To provide the most robust solution, platform level A-PNT includes layers of assurance such as modernized Global Navigation Satellite System (GNSS) Global Positioning System (GPS) receivers, improved resiliency functions in GPS receivers, navigation equipment, and anti-jam antenna systems. Alternate capabilities (non-GPS) and/or complimentary PNT solutions will be investigated, evaluated, and implemented as standalone or blended navigation functions. The implementation will be configurable to accept position, velocity, and time measurements from other PNT solutions. Embedded GPS Inertial Navigation System (EGI)/Enhanced Aviation Global air-traffic management (GATM) Localizer Performance with Vertical Guidance (LPV) EGI (EAGLE)/EAGLE-M integration and procurement introduce the capability to receive and process the new military code (M-Code) GPS signal security, significantly enhancing A-PNT capability. It supports the requirement to maintain A-PNT throughout operations and requires assessment and follow-on upgrade to the EGI navigation system. EAGLE-M will support future capabilities such as Alternate PNT (ALT-PNT) and additional system upgrades enabling Multi-Domain Operations (MDO) in contested GPS environments. EAGLE-M enables LPV allowing precision navigation and approach capabilities in both civil and military airspace. The Multi-platform Anti-jam GPS Navigation Antenna (MAGNA) integration and procurement introduces a GPS anti-jam adaptive antenna system capability that receives legacy and modernized Navigation System with Timing and Ranging (NAVSTAR) GPS satellite signals. The MAGNA reduces the effect of GPS jamming by rejecting the interfering signals before they disrupt the GPS receiver enabling the Warfighter continued access to GPS-provided PNT in a GPS degraded environment. The Doppler Global Positioning System Navigation Set (DGNS) Upgrade program supports system engineering to reduce space, weight, and power as well as supports current and future Civil Airspace requirements. This exhibit is for a budget line that procures multiple items and does not have a single Army Acquisition Objective. Secondary Distribution Army Quantity Total Obligation Authority ANG Quantity Total Obligation Authority LI 8662A01006 - Aviation ASSURED PNT Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 41.497 27.211 30.281 - 30.281 30.334 29.799 29.619 29.916 - - - - - - - - - 27.664 19.790 22.022 - 22.022 21.824 21.443 21.314 21.527 UNCLASSIFIED Page 4 of 10 P-1 Line #24 Volume 1 - 175 === page 212 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 P-1 Line Item Number / Title: 8662A01006 / Aviation ASSURED PNT ID Code (A=Service Ready, B=Not Service Ready) : Secondary Distribution AR Total: Secondary Distribution Modification Number / Title: A01006 / Aviation ASSURED PNT MDAP/MAIS Code: FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 Quantity - - - - - - - - - Total Obligation Authority - 2.474 2.752 - 2.752 2.728 2.680 2.664 2.691 Quantity Total Obligation Authority LI 8662A01006 - Aviation ASSURED PNT Army - - - - - - - - - 69.161 49.475 55.055 - 55.055 54.886 53.922 53.597 54.134 UNCLASSIFIED Page 5 of 10 P-1 Line #24 Volume 1 - 176 === page 213 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 8662A01006 / Aviation ASSURED PNT Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: UH/HH-60A/L/V, UH/ HH/MH-60M, CH-47D, CH/MH-47F, AH-64D/E, FW, UAS Prior Years Financial Plan Modification Number / Title: A01006 / Aviation ASSURED PNT Modification Type: New or Improved Operational Capability FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 3: DGNS (AN/ASN-128D) CDU/ SW Upgrade ECP B-Kit B Kits Recurring Fielding - / 3.696 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 3.696 Shared Services - / 1.867 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1.867 Subtotal: Recurring - / 5.563 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 5.563 System Test & Evaluation - / 1.094 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1.094 Subtotal: Non-Recurring - / 1.094 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1.094 - / 6.657 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 6.657 Non-Recurring Subtotal: DGNS (AN/ASN-128D) CDU/ SW Upgrade ECP B-Kit Modification Item 2 of 3: MAGNA - GPS Anti Jam Antenna A Kits Recurring MAGNA - A-Kits 938 / 8.520 1,000 / 4.700 - / - 146 / 2.821 - / - 146 / 2.821 224 / 4.424 146 / 2.941 306 / 7.156 184 / 4.269 Continuing Continuing Subtotal: Recurring 938 / 8.520 1,000 / 4.700 - / - 146 / 2.821 - / - 146 / 2.821 224 / 4.424 146 / 2.941 306 / 7.156 184 / 4.269 Continuing Continuing 862 / 26.969 - / - 100 / 2.530 90 / 4.057 - / - 90 / 4.057 90 / 4.143 90 / 4.230 90 / 4.318 90 / 4.409 Continuing Continuing - / - - / 1.100 - / 1.040 - / - - / 1.040 - / 2.083 - / 1.085 - / 1.315 - / 1.131 Continuing Continuing / 2.063 - / 5.251 - / 5.660 - / - - / 5.660 - / 5.778 - / 5.900 - / 6.024 - / 6.336 Continuing Continuing 10 / 0.427 - / - 10 / 0.427 10 / 0.436 10 / 0.445 10 / 0.454 10 / 0.464 Continuing Continuing 100 / 11.184 - / - 100 / 11.184 100 / 12.440 100 / 11.660 100 / 12.111 100 / 12.340 Continuing Continuing B Kits Recurring MAGNA - GPS Anti Jam Antenna Systems Test & Eval Shared Services - / 4.531 / 15.676 - MAGNA - Spares 82 / 2.385 - / - - / - Subtotal: Recurring 944 / 49.561 - / 2.063 100 / 8.881 - / 24.452 - / 1.100 - / 1.007 - / 0.171 - / - - / 0.171 - / 0.174 - / 2.486 - / 0.504 - / - Continuing Continuing - / 24.452 - / 1.100 - / 1.007 - / 0.171 - / - - / 0.171 - / 0.174 - / 2.486 - / 0.504 - / - Continuing Continuing 246 / 14.176 - / - Continuing Continuing Non-Recurring Aircraft Integration Subtotal: Non-Recurring Subtotal: MAGNA - GPS Anti Jam Antenna LI 8662A01006 - Aviation ASSURED PNT Army 1,882 / 82.533 1,000 / 7.863 100 / 9.888 UNCLASSIFIED Page 6 of 10 246 / 14.176 324 / 17.038 246 / 17.087 P-1 Line #24 406 / 19.771 284 / 16.609 Volume 1 - 177 === page 214 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 8662A01006 / Aviation ASSURED PNT Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : MDAP/MAIS Code: Models of Systems Affected: UH/HH-60A/L/V, UH/ HH/MH-60M, CH-47D, CH/MH-47F, AH-64D/E, FW, UAS Prior Years Financial Plan Modification Number / Title: A01006 / Aviation ASSURED PNT Modification Type: New or Improved Operational Capability FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Modification Item 3 of 3: Embedded GPS Inertial Nav System (EGI) EAGLE-M B Kit B Kits Recurring EGI EAGLE-M 806 / 36.202 213 / 29.516 EAGLE M Retrofit 213 / 19.776 156 / 9.161 Shared Services - - / 19.377 / 5.282 30 / 5.000 - / 6.353 EAGLE-M Spares New 99 / 4.161 - / - - / - EAGLE-M Spares Retrofit 24 / 2.095 - / - - / - - / - - / - System Test and Eval Subtotal: Recurring - / 11.756 1,142 / 93.367 369 / 43.959 43 / 5.671 - / - / - - / - / 5.649 - / - - 40 / 5.275 - / - 40 / 5.275 / - - / - - / - - / - 43 / 5.671 - 55 / 8.518 / / 5.649 - / - - / - - / / 5.769 - 34 / 5.266 - / - - / - - / - 30 / 11.353 83 / 16.595 - / - 83 / 16.595 89 / 19.553 / - 118 / 7.939 / 5.888 - / - 181 / 11.460 - / 6.012 - / - - / - 1,147 / 84.907 71 / 7.286 Continuing Continuing - Continuing Continuing / 6.138 - / - - / - - / - - / - - / - - / - Continuing Continuing - / - - / - - / - 118 / 13.827 181 / 17.472 - / - 173 / 14.702 Continuing Continuing 71 / 13.424 Continuing Continuing Non-Recurring Aircraft Integration - System Test and Eval Subtotal: Non-Recurring Subtotal: Embedded GPS Inertial Nav System (EGI) EAGLE-M B Kit / 45.788 - / 6.760 - / 4.391 - / 2.771 - / - - / 2.771 - / 6.514 - / 4.919 - / 4.742 - / 3.636 Continuing Continuing - - / 8.879 - / 5.292 - / 1.459 - / - - / 1.459 - / 1.346 - / 1.395 - / 1.403 - / 1.455 Continuing Continuing / 15.639 - / 9.683 - / 4.230 - / - - / 4.230 - / 7.860 - / 6.314 - / 6.145 - / 5.091 Continuing Continuing / - / 45.788 - - 1,142 / 139.155 369 / 59.598 30 / 21.036 83 / 20.825 - / - 83 / 20.825 89 / 27.413 118 / 20.141 181 / 23.617 71 / 18.515 Continuing Continuing 3,024 / 228.345 1,369 / 67.461 130 / 30.924 329 / 35.001 - / - 329 / 35.001 413 / 44.451 364 / 37.228 587 / 43.388 355 / 35.124 Continuing Continuing Modification Item 2 of 3: MAGNA - GPS Anti Jam Antenna 180 / 4.378 48 / 1.400 160 / 18.316 334 / 19.412 - / - 334 / 19.412 146 / 9.793 224 / 16.595 146 / 10.209 306 / 18.672 Modification Item 3 of 3: Embedded GPS Inertial Nav System (EGI) EAGLE-M B Kit - - / 0.300 132 / 0.235 353 / 0.642 - / - 353 / 0.642 346 / 0.642 55 / 0.099 Subtotal: Installation 180 / 4.703 48 / 1.700 292 / 18.551 687 / 20.054 - / - 687 / 20.054 492 / 10.435 279 / 16.694 233.048 69.161 49.475 55.055 - 55.055 54.886 53.922 Subtotal: Procurement, All Modification Items Installation / 0.325 - / - 1,544 / 98.775 / 0.338 - / - 886 / 2.581 146 / 10.209 306 / 19.010 - / - 2,430 / 101.356 53.597 54.134 - / - - Total Total Cost (Procurement + Support + Installation) LI 8662A01006 - Aviation ASSURED PNT Army UNCLASSIFIED Page 7 of 10 P-1 Line #24 Continuing Continuing Volume 1 - 178 === page 215 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 P-1 Line Item Number / Title: 8662A01006 / Aviation ASSURED PNT ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: A01006 / Aviation ASSURED PNT MDAP/MAIS Code: Modification Item 1 of 3: DGNS (AN/ASN-128D) CDU/ SW Upgrade ECP B-Kit Manufacturer Information Manufacturer Name: BAE International Incorporated Manufacturer Location: Wayne, NJ Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Modification Work Order (MWO) LI 8662A01006 - Aviation ASSURED PNT Army Installation Quantity: 0 UNCLASSIFIED Page 8 of 10 P-1 Line #24 Volume 1 - 179 === page 216 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 8662A01006 / Aviation ASSURED PNT Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: A01006 / Aviation ASSURED PNT MDAP/MAIS Code: Modification Item 2 of 3: MAGNA - GPS Anti Jam Antenna Manufacturer Information Manufacturer Name: Mayflower Communications, Inc Manufacturer Location: Bedford, MA Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2024 Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Delivery Dates Nov 2025 Nov 2026 Nov 2027 Nov 2028 Nov 2029 Nov 2030 Nov 2031 Installation Information Method of Implementation: Modification Work Order (MWO) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 48 / 1.400 - / - - / - - / - - / - - / - - / - - / - - / - - / - 48 / 1.400 - / - - / - - / - - / - - / - - / - - / - - / - 160 / 18.316 - / - - / - - / - - / - - / - 334 / 19.412 - / - - / - - / - - / - 146 / 9.793 - / - - / - - / - 224 / 16.595 - / - - / - 146 / 10.209 - / - 306 / 18.672 - / - - - / - 1,544 / 98.775 Q4 TC Prior Years 180 / 4.378 FY 2025 - / - FY 2026 - / - - / - FY 2027 - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 180 / 4.378 160 / 18.316 334 / 19.412 48 / 1.400 160 / 18.316 334 / 19.412 334 / 19.412 146 / 9.793 334 / 19.412 224 / 16.595 146 / 9.793 146 / 10.209 224 / 16.595 306 / 18.672 - 146 / 10.209 / - 306 / 18.672 180 / 4.378 / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 In 459 47 47 48 48 46 46 47 47 59 59 59 59 62 62 62 62 55 55 55 55 51 51 51 51 77 77 76 76 2,449 4,498 Out 455 125 47 47 48 48 46 46 47 47 59 59 59 59 62 62 62 62 55 55 55 55 51 51 51 77 77 76 76 2,379 4,498 LI 8662A01006 - Aviation ASSURED PNT Army UNCLASSIFIED Page 9 of 10 P-1 Line #24 Tot Volume 1 - 180 === page 217 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Army P-1 Line Item Number / Title: 8662A01006 / Aviation ASSURED PNT Appropriation / Budget Activity / Budget Sub Activity: 2031A / 02 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Modification Number / Title: A01006 / Aviation ASSURED PNT MDAP/MAIS Code: Modification Item 3 of 3: Embedded GPS Inertial Nav System (EGI) EAGLE-M B Kit Manufacturer Information Manufacturer Name: Honeywell, Incorporated Manufacturer Location: Clearwater, FL Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2024 Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Delivery Dates Nov 2025 Nov 2026 Nov 2027 Nov 2028 Nov 2029 Nov 2030 Nov 2031 Installation Information Method of Implementation: Modification Work Order (MWO) Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 0 / 0.325 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - 0 / 0.300 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.300 FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 132 / 0.235 FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - 353 / 0.642 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 346 / 0.642 FY 2029 - / - - / - - / - - / - - / - - / - - / - 55 / 0.099 - / - - / - - / - 55 / 0.099 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 0 / 0.338 - / - 0 / 0.338 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 0 / 0.325 - / - 55 / 0.099 - / - 0 / 0.338 - / - 132 / 0.235 0 / 0.300 353 / 0.642 132 / 0.235 353 / 0.642 353 / 0.642 346 / 0.642 353 / 0.642 346 / 0.642 0 / 0.325 - / / - 886 / 2.581 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 In 50 79 79 79 79 33 33 33 33 88 88 88 89 86 87 86 87 74 74 74 74 64 65 65 65 31 31 31 31 3,730 5,606 Out 38 54 79 79 79 79 33 33 33 33 88 88 88 89 86 87 86 87 74 74 74 74 64 65 65 31 31 31 31 3,753 5,606 LI 8662A01006 - Aviation ASSURED PNT Army UNCLASSIFIED Page 10 of 10 P-1 Line #24 Q4 TC Tot Volume 1 - 181 === page 218 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 8859AA0711 / GATM Rollup Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 817.851 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 817.851 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 817.851 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 4.842 4.651 - - - - - - - - - - - - - - - - - - 4.842 4.651 - - - - - - - - - - - - - - - - - - 4.842 4.651 - - - - - - - - Total 827.344 827.344 827.344 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Global Air Traffic Management (GATM) provides the equipment, training, and procedures mandated by Civilian Air Traffic Control (ATC) authorities in order to operate within 21st century airspace. GATM requirements are driven by civil aviation authorities and are not under DoW control. Meeting the worldwide GATM requirement will entail the upgrade and procurement of the Common Transponder (CXP) for rotary wing and Unmanned Aircraft System fleets. GATM provides Army aircraft with improved capabilities to allow them to continue to operate in civil controlled airspace. Identification Friend or Foe (IFF) Mode 5 provides enhanced security and greatly improved performance and also improves compatibility with civil ATC by providing less interference. GATM is also necessary since Europe currently mandates Mode S, a Secondary Surveillance Radar process, and plans expansion of the ability for Air Traffic Controllers to communicate with more aircraft in controlled airspace in high volume traffic areas. Army aircraft will not be allowed to transit through or operate in European airspace affected by these mandates unless the necessary GATM upgrades are made. Benefits of GATM include allowing for operations in worldwide civil controlled airspace and improving safety and operational efficiency while meeting emerging security requirements. FY 2024 was the final year of APX-123A procurement. FY 2025/FY 2026 funding will integrate a backwards compatible next generation transponder. The Micro Common Transponder (MCX) will replace the legacy APX-123A, providing advanced technology while remaining backward compatible with current aircraft platforms. Future software updates of the MCX will incorporate new collision avoidance capabilities, deconflicting airspace for both manned and unmanned aircraft. Secondary Distribution Army Quantity Total Obligation Authority ANG Quantity Total Obligation Authority AR Quantity Total Obligation Authority Total: Quantity LI 8859AA0711 - GATM Rollup Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 2.663 2.558 - - - - - - - - - - - - - - - - 1.937 1.860 - - - - - - - - - - - - - - - - 0.242 0.233 - - - - - - - - - - - - - - - - UNCLASSIFIED Page 1 of 2 P-1 Line #25 Volume 1 - 182 === page 219 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 8859AA0711 / GATM Rollup Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Secondary Distribution Secondary Distribution Total Obligation Authority FY 2025 4.842 FY 2026 4.651 FY 2027 Base FY 2027 OOC - FY 2027 Total - FY 2028 - FY 2029 - FY 2030 - FY 2031 - - Justification: There is no FY 2027 funding request for GATM Rollup. LI 8859AA0711 - GATM Rollup Army UNCLASSIFIED Page 2 of 2 P-1 Line #25 Volume 1 - 183 === page 220 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: 9556A01002 / UAS MODS Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 95.401 2.265 - - - - - - - - - - - - - - - - - - 95.401 2.265 - - - - - - - - - - - - - - - - - - - - 95.401 2.265 - - - - - - - - Continuing Continuing Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) To FY 2031 Complete Total Continuing Continuing Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The One System Remote Video Terminal (OSRVT) Increment II consists of a base system with Remote Operations Video Enhanced Receiver (ROVER) 6 and 6S transceiver, tablet computer, Antennas, Type I encryption, Ku-Directional Antennas (KuDA) with an On-The-Move (OTM) capable variant, and an extended range Mobile Directional Antennas System (MDAS). OSRVT is a kit integrated with the ROVER 6 and upgraded ROVER 6S (R6S) transceiver that provides full motion video and telemetry data from multiple unmanned platforms: Gray Eagle, Shadow, Raven, Puma, Predator, Reaper, other UAS and crewed platforms [Apache, Fixed Wing, Litening/Sniper Pods]. Software supports decoding Telemetry Data from multiple Manned/Unmanned Aircraft Systems, provides Electro-Optical (EO)/Infrared (IR) payload control, and supports off-target calculations. In 1QFY24, the OSRVT began fielding the R6S variant to meet new spectrum frequency requirements and the system also includes a Soldier Portable OSRVT (SPOT) variant for dismounted users consisting of a wearable tablet computer and a Tactical Net ROVER 2 Encrypted (TNR 2E) transceiver. OSRVT supports current operations and future UAS (Launched Effects, Scalable Control Interface, and Future Tactical Uncrewed Aircraft System) requirements. The OSRVT MODS APE A000121000, began in FY 2017. Prior to FY 2017, OSRVT Procurement funds were provided via the SHADOW MODS APE A00018000. The UAS Marketplace expands the Defense Industrial Base, expedites capability delivery, and provides warfighters with vetted, flexible solutions to meet mission requirements. The UAS Marketplaces operationalizes a streamlined acquisition framework for both Programs of Record (PoR) and emerging capabilities. The UAS Marketplace empowers the warfighter at the tactical edge, providing the flexibility to procure vetted, mission-specific, UAS solutions. The PM UAS will leverage this centralized marketplace to execute all UAS procurements and deliveries, ensuring soldiers are equipped through a modern, efficient, and scalable marketplace. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 2.265 - - - - - - - - - - - - - - - - - 2.265 - - - - - - - - Justification: LI 9556A01002 - UAS MODS Army UNCLASSIFIED Page 1 of 2 P-1 Line #26 Volume 1 - 184 === page 221 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 02: Modification of Aircraft / BSA 10: Modification of Aircraft ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 9556A01002 / UAS MODS Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A No FY 2027 Funding request for UAS Mods LI 9556A01002 - UAS MODS Army UNCLASSIFIED Page 2 of 2 P-1 Line #26 Volume 1 - 185 === page 222 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 04: Support Equipment and Facilities / BSA 3632AZ3504 / Aircraft Survivability Equipment 10: Ground Support Avionics Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 1,203.109 11.565 1,191.544 11.565 1,203.109 139.331 139.331 139.331 145.297 145.297 145.297 125.050 - - 125.050 - 125.050 - - 125.050 - 125.050 - 125.050 102.280 102.280 102.280 124.574 124.574 124.574 To FY 2031 Complete 121.959 121.959 121.959 122.182 Continuing 122.182 122.182 Total - Continuing Continuing 11.565 Continuing - 11.565 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The FY 2026 spend plan amount for Aircraft Survivability Equipment includes $145,297K of discretionary and $16,130K of mandatory (reconciliation) for a total of $161,427K. The Aircraft Survivability Equipment (ASE) budget line includes ASE Laser Countermeasures (AZ3508) and ASE Radio Frequency Countermeasures (AZ3511). AZ3508 ASE Laser Countermeasures Army Procurement Objective (APO) = 1,988 (APO based on B-Kits) APO Ref: Approval of the Army Acquisition Objective /Army Procurement Objective Change Request Decision 25 Apr 2022 AN/AVR-2B Laser Detecting Set (LDS) installed on Army rotary-wing aircraft passively detects laser-aided weapons targeting the aircraft and alerts aircrews, allowing them to engage the threat or maneuver to break the targeting. The system detects aircraft illumination by laser rangefinders, laser target designators, and laser beam rider surface-to-air missiles. The system provides the aircrew with visual and aural warnings prioritized by threat lethality using 360 degree azimuth and 90 degree elevation field of view coverage. AN/AVR-2B is part of the suite of ASE mission equipment for Future Long-Range Assault Aircraft (FLRAA). AZ3511 Radio Frequency Countermeasures APO D(V)2 = 120 (APO based on B-Kits) APO E(V)2 = 1,200 (APO based on B-Kits) APO Ref: According to E(V)2 Acquisition Program Baseline (APB) dated 5 Jan 2020 AN/APR-39E(V)2, Modernized Radar Warning Receiver (MRWR), is an Army Engineering Change Proposal (ECP) to AN/APR-39D(V)2, and is approved in the Acquisition Decision Memorandum (ADM) signed June 24, 2019. This ECP enhances hardware and software upgrades to keep AN/APR-39 technically relevant against new and emerging agile threats faced by legacy platforms in a near peer contest. AN/ LI 3632AZ3504 - Aircraft Survivability Equipment Army UNCLASSIFIED Page 1 of 15 P-1 Line #27 Volume 1 - 186 === page 223 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 04: Support Equipment and Facilities / BSA 3632AZ3504 / Aircraft Survivability Equipment 10: Ground Support Avionics Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A APR-39E(V)2 is part of the suite of Aircraft Survivability Equipment (ASE) mission equipment for the Enduring Fleet and Multi-Mission Vertical Takeoff (MV)-75 Future Long-Range Assault Aircraft (FLRAA). Procurement dollars support A-Kit procurement, A-Kit installs, B-Kits, spares, systems engineering support, mission data sets (MDS), training, fielding, and systems engineering program management (SEPM). Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 3632AZ3504 - Aircraft Survivability Equipment Army FY 2025 FY 2027 Base FY 2026 - 139.331 139.331 145.297 145.297 FY 2027 OOC - 125.050 125.050 UNCLASSIFIED Page 2 of 15 FY 2027 Total - FY 2028 - FY 2029 - 125.050 102.280 - - 125.050 102.280 P-1 Line #27 FY 2030 - 124.574 124.574 FY 2031 - 121.959 121.959 122.182 122.182 Volume 1 - 187 === page 224 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 04: Support Equipment and Facilities / BSA 3632AZ3504 / Aircraft Survivability Equipment 10: Ground Support Avionics Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 AZ3508 / ASE Laser CM P-5a - / 488.487 - / 21.399 - / 35.996 / 9.261 - / - P-5 AZ3511 / Radio Frequency CM P-5a, P-21 - / 714.622 - / 117.932 - / 109.301 - / 115.789 - / - - / 115.789 P-40 Total Gross/Weapon System Cost / 1,203.109 - / 139.331 - / 145.297 - / 125.050 - / - - / 125.050 - - - / 9.261 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Fiscal Year 2027 Procurement funding will support the Laser Detecting Set (LDS) and Modernized Radar Warning Receiver (MRWR) programs. For the LDS (AZ3508), this funding provides for training, technical and sustainment support, government management, and A-kit installation on CH-47F aircraft to meet required operational capabilities. It also enables the integration of the AN/AVR-2B LDS with other Aircraft Survivability Equipment (ASE) systems to incorporate innovative solutions. For the MRWR (AZ3511), the funding will cover A-Kit procurement and installations, B-Kits, spares, systems engineering support, Mission Data Set (MDS) development, training, fielding, and Systems Engineering Program Management (SEPM). FY 2026 to FY 2027 funding decrease for ASE Laser Countermeasures (AZ3508) is due to less A-Kit installations. FY 2026 to FY 2027 funding increase for Radio Frequency Countermeasures (AZ3511) is due to increased B-Kit procurements to support AH-64 units and Future Long-Range Assault Aircraft (FLRAA). In accordance with section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110 - 181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 3632AZ3504 - Aircraft Survivability Equipment Army UNCLASSIFIED Page 3 of 15 P-1 Line #27 Volume 1 - 188 === page 225 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3632AZ3504 / Aircraft Survivability Equipment Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: AZ3508 / ASE Laser CM MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 21.399 35.996 9.261 - 9.261 - Gross/Weapon System Cost ($ in Millions) 488.487 FY 2027 Total Less PY Advance Procurement ($ in Millions) 11.565 - - - - - Net Procurement (P-1) ($ in Millions) 476.922 21.399 35.996 9.261 - 9.261 Plus CY Advance Procurement ($ in Millions) 11.565 - - - - - Total Obligation Authority ($ in Millions) 488.487 21.399 35.996 9.261 - 9.261 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost Non Recurring Engineering (A-Kit) - - 13.688 - - - - - - - - - - - - - - - A-Kit Procurement 46.436 1,226 56.931 90.558 86 7.788 - - - - - - - - - - - - A-Kit Installation UH-60L 74.568 760 56.672 - - - - - - - - - - - - - - - - - 18.529 - - - - - - - - - - - - - - - 1,332 195.708 - - - - - - - - - - - - - - - (†) A-Kit filters B-Kit Procurement 146.928 Systems Engineering - - 21.276 - - 1.020 - - 0.971 - - 0.281 - - - - - 0.281 Program Management - - 19.148 - - 0.595 - - 0.950 - - 0.610 - - - - - 0.610 Prime Contractor Prgm Mgt / Engr Spt - - 8.354 - - 0.523 - - 1.983 - - 1.035 - - - - - 1.035 Software - - 9.936 - - - - - - - - - - - - - - - Engineering Changes - - 0.638 - - - - - - - - - - - - - - - Systems Test and Evaluation - - 29.387 - - - - - - - - - - - - - - - Training / Logistics - - 28.236 - - - - - - - - - - - - - - - Depot / Field Support - - 6.938 - - - - - 3.023 - - 0.640 - - - - - 0.640 Fielding - - 2.900 - - - - - - - - - - - - - - - Other Procurement - - 0.218 - - - - - 0.030 - - - - - - - - - A-Kit Installation CH-47F 93.935 168 15.781 93.133 83 7.730 80 10.702 37 4.990 - - - 37 4.990 LI 3632AZ3504 - Aircraft Survivability Equipment Army 133.775 UNCLASSIFIED Page 4 of 15 134.865 P-1 Line #27 134.865 Volume 1 - 189 === page 226 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3632AZ3504 / Aircraft Survivability Equipment Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: AZ3508 / ASE Laser CM MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Tech Support - - 3.472 - - 2.977 - - 1.467 - - 0.965 - - - - - 0.965 Data- Threat Analysis - - 0.675 - - 0.766 - - 0.740 - - 0.740 - - - - - 0.740 Congressional Add - - - - - - - - 16.130 - - - - - - - - - Subtotal: Recurring Cost - - 488.487 - - 21.399 - - 35.996 - - 9.261 - - - - - 9.261 Subtotal: Flyaway Cost - - 488.487 - - 21.399 - - 35.996 - - 9.261 - - - - - 9.261 Gross/Weapon System Cost - - 488.487 - - 21.399 - - 35.996 - - 9.261 - - - - - 9.261 Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total - - - - - 21.399 35.996 9.261 - 9.261 - - - - - 21.399 35.996 9.261 - 9.261 indicates the presence of a P-5a LI 3632AZ3504 - Aircraft Survivability Equipment Army UNCLASSIFIED Page 5 of 15 P-1 Line #27 Volume 1 - 190 === page 227 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 10 Cost Elements A-Kit Procurement A-Kit Procurement A-Kit Procurement O O C P-1 Line Item Number / Title: 3632AZ3504 / Aircraft Survivability Equipment Method/Type or Funding Vehicle Item Number / Title [DODIC]: AZ3508 / ASE Laser CM Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty FY Contractor and Location 2023 Prototype Integration Facility / Redstone Arsenal, AL C / CPFF Redstone Arsenal, AL May 2023 Aug 2024 30 97.667 N 2024 Prototype Integration Facility / Redstone Arsenal, AL C / CPFF Redstone Arsenal, AL Sep 2024 Sep 2025 83 82.289 N 2025 Prototype Integration Facility / Redstone Arsenal, AL C / CPFF Redstone Arsenal, AL Sep 2025 Sep 2026 86 90.558 N LI 3632AZ3504 - Aircraft Survivability Equipment Army UNCLASSIFIED Page 6 of 15 P-1 Line #27 (Each) RFP Issue Date Volume 1 - 191 === page 228 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3632AZ3504 / Aircraft Survivability Equipment Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: AZ3511 / Radio Frequency CM MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) - 714.622 Less PY Advance Procurement ($ in Millions) 117.932 - Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) 115.789 - - - 109.301 115.789 - 115.789 - 117.932 FY 2027 Total - - 109.301 - 714.622 - - 117.932 - Total Obligation Authority ($ in Millions) FY 2027 OOC - 109.301 - 714.622 FY 2027 Base - 115.789 - 115.789 - - 115.789 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 7,852.989 - 2,742.605 - 3,643.367 - 3,859.633 - - 3,859.633 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Non Recurring Cost A-Kit NRE - - 128.890 - - - - - - - - - - - - - - - ATR-Reprogramming - - 42.341 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 171.231 - - - - - - - - - - - - - - - - - 171.231 - - - - - - - - - - - - - - - Subtotal: Flyaway Cost Hardware Cost Recurring Cost A-Kit Procurement 120.098 82 9.848 - - - - - - - - - - - - - - - A-Kit Installs 186.464 69 12.866 - - - - - - - - - - - - - - - B-Kit Procurement 438.966 89 39.068 - - - - - - - - - - - - - - - Replacement Flight Line Test Sets - - 9.169 - - - - - - - - - - - - - - - Retrofit - - 3.221 - - - - - - - - - - - - - - - B-Kit Spares - - 4.100 - - - - - - - - - - - - - - - 20 17.789 - - - - - - - - - - - - - - - - - 200.000 48 9.600 206.000 48 9.888 210.111 27 5.673 - - - 210.111 27 5.673 2,281.296 27 61.595 2,349.750 24 56.394 2,227.200 30 66.816 - - - 2,227.200 30 66.816 - 18.250 - 8.476 - 4.823 - - - - 4.823 D(V)2 Integration Assets A-Kit Procurement EV2 B-Kit Procurement (†) EV2 B-Kit Spares EV2 889.450 1,780.736 - 91 162.047 - 12.029 LI 3632AZ3504 - Aircraft Survivability Equipment Army - - UNCLASSIFIED Page 7 of 15 - P-1 Line #27 - Volume 1 - 192 === page 229 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3632AZ3504 / Aircraft Survivability Equipment Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: AZ3511 / Radio Frequency CM MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) A-Kit Installs E(V)2 - - Subtotal: Recurring Cost - - System Test and Evaluation - Other - Technology Insertion/ Hardware parts Withhold ($ K) - FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) - - - 270.137 - - 89.445 - 33.175 - - - 24.548 - - - - 0.601 - - - 1.652 - - 59.976 - - Mission Data Set (MDS) - Other Software Sustainment 104.417 FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) 48 5.012 - - 79.770 - - - - - - - - - - - - - - - 330.113 - - - 35.422 - - - 26.958 System Integration Lab (SIL) and RF Threat Generation - - Subtotal: Non Recurring Cost - 106.500 FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) 48 5.112 - - - - - 82.424 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 89.445 - - 79.770 - - - 4.014 - - 2.781 - - - - - - - 24.278 - - 0.710 - - - 86.658 - - 4.724 - - - 86.658 - - 4.724 Training - - 2.729 - - Fielding - - 4.585 - - ICLS/ICS - - - - - - 7.314 Other - - Support Equipment - - Subtotal: Non Recurring Cost - 106.500 Total Cost Qty (Each) ($ M) 48 5.112 - - 82.424 - - - - - - - - - - - - - - - - - - - - - - - - - 82.424 - - - - - 82.424 - 4.213 - - - - - 4.213 - - - - - - - - - 1.668 - - 2.063 - - - - - 2.063 - 4.449 - - 6.276 - - - - - 6.276 - - 4.449 - - 6.276 - - - - - 6.276 - - - 1.275 - - 1.528 - - - - - 1.528 - - - 0.901 - - 1.267 - - - - - 1.267 - 5.431 - - 4.275 - - 4.921 - - - - - 4.921 - - 5.431 - - 6.451 - - 7.716 - - - - - 7.716 1.980 - - - - - - - - - - - - - - - 2.957 - - 0.951 - - 0.939 - - 0.959 - - - - - 0.959 - 4.937 - - 0.951 - - 0.939 - - 0.959 - - - - - 0.959 - - 12.251 - - 6.382 - - 7.390 - - 8.675 - - - - - 8.675 - - 17.514 - - - - - - - - - - - - - - - Non Recurring Cost Subtotal: Non Recurring Cost Subtotal: Hardware Cost Software Cost Non Recurring Cost Subtotal: Software Cost Logistics Cost Recurring Cost Subtotal: Recurring Cost Non Recurring Cost Subtotal: Logistics Cost Support - Program Management Cost Contractor Management LI 3632AZ3504 - Aircraft Survivability Equipment Army UNCLASSIFIED Page 8 of 15 P-1 Line #27 Volume 1 - 193 === page 230 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 3632AZ3504 / Aircraft Survivability Equipment Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: AZ3511 / Radio Frequency CM MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) Government Management FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - 37.955 - - 7.300 - - 7.543 - - 7.710 - - - - - 7.710 - - 55.469 - - 7.300 - - 7.543 - - 7.710 - - - - - 7.710 System Engineering - - 58.900 - - 10.081 - - 10.149 - - 10.704 - - - - - 10.704 Subtotal: Support - System Engineering Cost - - 58.900 - - 10.081 - - 10.149 - - 10.704 - - - - - 10.704 - 714.622 - 117.932 - 109.301 - 115.789 - - - - 115.789 Subtotal: Support - Program Management Cost Support - System Engineering Cost Gross/Weapon System Cost 7,852.989 2,742.605 Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority 3,643.367 FY 2025 3,859.633 FY 2027 Base FY 2026 117.932 117.932 FY 2027 OOC 109.301 115.789 109.301 3,859.633 115.789 FY 2027 Total - 115.789 115.789 indicates the presence of a P-5a LI 3632AZ3504 - Aircraft Survivability Equipment Army UNCLASSIFIED Page 9 of 15 P-1 Line #27 Volume 1 - 194 === page 231 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 10 Cost Elements (†) B-Kit Procurement EV2 (†) B-Kit Procurement EV2 (†) B-Kit Procurement EV2 (†) B-Kit Procurement EV2 (†) B-Kit Procurement EV2 (†) O O C P-1 Line Item Number / Title: 3632AZ3504 / Aircraft Survivability Equipment Method/Type or Funding Vehicle Item Number / Title [DODIC]: AZ3511 / Radio Frequency CM Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty FY Contractor and Location 2023 Northrop Grumman / Rolling Meadow, IL C / CPIF Redstone Arsenal, AL Mar 2023 Mar 2025 48 1,800.000 N 2024 Northrop Grumman / Rolling Meadow, IL C / CPIF Redstone Arsenal, AL Jan 2024 Feb 2026 43 1,759.233 N 2025 Northrop Grumman / Rolling Meadow, IL SS / FFP Redstone Arsenal, AL Jan 2025 Feb 2027 27 2,281.296 N 2026 Northrop Grumman / Rolling Meadow, IL SS / FFP Redstone Arsenal, AL Jan 2026 Feb 2028 24 2,349.750 N 2027 Northrop Grumman / Rolling Meadow, IL SS / FFP Redstone Arsenal, AL Nov 2026 Feb 2029 30 2,227.200 N (Each) RFP Issue Date indicates the presence of a P-21 Remarks: Unit Cost increase is due to reduced quantity buy from quantity 48 to 24. LI 3632AZ3504 - Aircraft Survivability Equipment Army UNCLASSIFIED Page 10 of 15 P-1 Line #27 Volume 1 - 195 === page 232 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3632AZ3504 / Aircraft Survivability Equipment Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: AZ3511 / Radio Frequency CM Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B-Kit Procurement EV2 1 2023 ARMY 48 0 48 1 2024 ARMY 43 0 43 A - - - - - - - - - - - - - - - - - - - 48 A - - - - - - - - - 1 2025 ARMY 27 0 27 43 27 1 2026 ARMY 24 0 24 24 1 2027 ARMY 30 0 30 30 O C T N O V LI 3632AZ3504 - Aircraft Survivability Equipment Army D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #27 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 196 === page 233 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3632AZ3504 / Aircraft Survivability Equipment Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: AZ3511 / Radio Frequency CM Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B-Kit Procurement EV2 1 2023 ARMY 48 0 48 - - - - - 1 2024 ARMY 43 0 43 - - - - - - 6 - 6 - 4 - 4 - 4 - 4 - 4 - 4 - 4 - 4 1 2025 ARMY 27 0 27 A - - - - - - - - - - - - 1 2026 ARMY 24 0 24 1 2027 ARMY 30 0 30 4 0 - 4 4 4 4 4 4 4 3 12 - - - - - - - - - 27 A - - - - - - - - - 24 30 O C T N O V LI 3632AZ3504 - Aircraft Survivability Equipment Army D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #27 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 197 === page 234 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3632AZ3504 / Aircraft Survivability Equipment Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: AZ3511 / Radio Frequency CM Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B-Kit Procurement EV2 1 2023 ARMY 48 48 0 1 2024 ARMY 43 31 12 0 1 2025 ARMY 27 0 27 - - - - 1 2026 ARMY 24 0 24 - - - - - - - - - - - - - - - - 1 2027 ARMY 30 0 30 A - - - - - - - - - - - - - - - 3 O C T 3 N O V LI 3632AZ3504 - Aircraft Survivability Equipment Army 3 D E C 3 J A N 0 3 F E B 3 M A R 3 A P R 2 M A Y 2 J U N 2 J U L 2 A U G UNCLASSIFIED Page 13 of 15 2 S E P 2 O C T 2 N O V 2 D E C 2 J A N 0 2 2 F E B P-1 Line #27 2 M A R 2 A P R 2 M A Y 2 J U N 2 J U L 2 A U G - 8 30 S E P Volume 1 - 198 === page 235 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3632AZ3504 / Aircraft Survivability Equipment Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: AZ3511 / Radio Frequency CM Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E B-Kit Procurement EV2 1 2023 ARMY 48 48 0 0 1 2024 ARMY 43 43 0 0 1 2025 ARMY 27 27 0 1 2026 ARMY 24 16 8 1 2027 ARMY 30 0 30 0 2 2 O C T 2 N O V LI 3632AZ3504 - Aircraft Survivability Equipment Army 2 D E C 0 J A N 2 F E B 2 M A R 2 A P R 2 M A Y 2 J U N 2 J U L 3 A U G UNCLASSIFIED Page 14 of 15 3 S E P 3 O C T 3 N O V 3 D E C 3 J A N 0 F E B P-1 Line #27 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 199 === page 236 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 3632AZ3504 / Aircraft Survivability Equipment Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 10 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: AZ3511 / Radio Frequency CM Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Northrop Grumman - Rolling Meadow, IL MSR For 2027 1-8-5 For 2027 MAX For 2027 2 6 10 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 24 Total After Oct 1 ALT Prior to Oct 1 24 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 3632AZ3504 - Aircraft Survivability Equipment Army UNCLASSIFIED Page 15 of 15 P-1 Line #27 Volume 1 - 200 0 === page 237 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 04: Support Equipment and Facilities / BSA 5397AZ3517 / CMWS 10: Ground Support Avionics Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0605051A Line Item MDAP/MAIS Code: 219 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 1,655.176 1,655.176 1,655.176 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 51.646 38.419 21.511 - 21.511 13.383 13.434 13.347 13.480 29.323 - - - - - - - - - - 51.646 38.419 21.511 - 21.511 13.383 13.434 13.347 13.480 29.323 - - - - - - - - - - 51.646 38.419 21.511 - 21.511 13.383 13.434 13.347 13.480 29.323 Total 1,849.719 1,849.719 1,849.719 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Missile Warning (MW) Army Procurement Objective (APO) = 1,988 (B-Kits). On April 15, 2022 the Army Requirements Oversight Council (AROC) approved an APO increase for MW B-Kits from 1351 to 1988. APO will be achieved through a future modernization effort. Common Missile Warning System (CMWS): APO = 1,351 (B-Kits) The CMWS program is the legacy missile warning system that cues both flare and laser-based countermeasures to defeat incoming Infrared (IR)-seeking missiles and will alert aircrews to the presence of certain incoming munitions. CMWS provides protection to aircraft and aircrews against proliferated IR guided missile threats and will remain in the Army inventory until replaced. The B-Kit consists of the components which perform the missile detection and aircrew notification, munitions detection and aircrew notification, false alarm rejection, and countermeasure employment/cueing functions of the system. The CMWS Electronic Control Unit (ECU) receives ultraviolet (UV) missile detection data from Electro-Optic Missile Sensors (EOMS), which detect UV signals, and sends a missile alert signal to warn aircrews via on-board avionics. Tier 1 threat missiles detected and tracked by CMWS are subsequently defeated by a combination of missile seeker countermeasures, including decoy flares and Common Infrared Countermeasures (CIRCM). In addition, CMWS ECU receives hostile fire detection data from the EOMS which passes to the aircrew through aural and visual alerts. The aircrew then applies the appropriate Tactics, Techniques and Procedures (TTPs) to break contact or engage the enemy with own-ship ordnance. The A-Kit for CMWS includes mounting hardware, wiring harnesses, cables, and other components necessary to install and interface the mission kit on host aircraft. The A-Kit ensures the mission kit is functionally and physically operational with a specific host aircraft type and will be utilized by the ITDS to maximum extent to enable the integration of innovative solutions and technologies. Limited Interim Missile Warning System (LIMWS) QRC: APO = 399 (B-Kits) LI 5397AZ3517 - CMWS Army UNCLASSIFIED Page 1 of 8 P-1 Line #28 Volume 1 - 201 === page 238 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 04: Support Equipment and Facilities / BSA 5397AZ3517 / CMWS 10: Ground Support Avionics Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0605051A Line Item MDAP/MAIS Code: 219 LIMWS QRC addresses the Headquarters Department of the Army (HQDA) Directed Requirement to provide a greater capability than CMWS in an interim status, until the Improved Threat Detection System (ITDS) is fielded. LIMWS provides increased detection range, improved detection in clutter, more agile algorithms to rapidly respond to emerging threats, and eliminates the need for sensor alignments. References: - Joint Staff, J-8 Deputy Director for Requirements (DOR) memorandum, April 24, 2015 - SOCOM JUONs SO-0010, Joint Rapid Acquisition Cell (JRAC) memorandum, May 29, 2015 - Directed Requirement for the Phase 3 Advanced Threat Warner and Common Infrared Countermeasure Quick Reaction Capability (ATW/CIRCM QRC) to Support Joint Urgent Operational Need (JUON) SO-0010, CIRCM Critical Intelligence Parameters Breach, December 18, 2015 - Directed Requirement for Limited Interim Missile Warning System to Detect Enemy Man Portable Air Defense Systems, March 26, 2017 - Update to the Directed Requirement for the United States Special Operations Command Joint Urgent Operational Needs SO-0010 Threat Detection and Countermeasures to Enemy Man Portable Air Defense System Capability, November 16, 2018 - Directed Requirement for Limited Interim Missile Warning System to Detect Enemy Man Portable Air Defense Systems, November 16, 2018 - Aircraft Survivability Equipment (ASE) Modernization Fielding Guidance, Change 1, November 19, 2018 Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 5397AZ3517 - CMWS Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 51.646 38.419 21.511 - 21.511 13.383 13.434 13.347 13.480 - - - - - - - - - 51.646 38.419 21.511 - 21.511 13.383 13.434 13.347 13.480 UNCLASSIFIED Page 2 of 8 P-1 Line #28 Volume 1 - 202 === page 239 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 04: Support Equipment and Facilities / BSA 5397AZ3517 / CMWS 10: Ground Support Avionics Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0605051A Line Item MDAP/MAIS Code: 219 Exhibits Schedule Exhibit Type Title* P-5 AZ3517 / CMWS P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code P-5a Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 1,655.176 - / 51.646 - / 38.419 - / 21.511 - / - - / 21.511 - / 1,655.176 - / 51.646 - / 38.419 - / 21.511 - / - - / 21.511 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Procurement funding supports the Common Missile Warning System (CMWS) and the Limited Interim Missile Warning System (LIMWS). For CMWS, this includes software maintenance, system engineering, system of systems analysis, algorithm analysis, and System Test and Evaluation (ST&E) to ensure it continues to meet operational requirements. For the LIMWS Quick Reaction Capability (QRC), the funding supports direct combat support expenses in the Central Command (CENTCOM) Area of Responsibility (AOR) through software sustainment, contractor logistics, and product support. Request to Army Futures Command to assign a disposition official for LIMWS was requested on 31 March 2025 as outlined in AR 71-9 and the program is awaiting decision. FY 2026 to FY 2027 funding decrease is due to reduced LIMWS Sustainment Support. Additionally, CMWS/LIMWS supports rotational based capability for Army Aviation. LI 5397AZ3517 - CMWS Army UNCLASSIFIED Page 3 of 8 P-1 Line #28 Volume 1 - 203 === page 240 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 5397AZ3517 / CMWS Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: AZ3517 / CMWS MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 51.646 38.419 21.511 - 21.511 - Gross/Weapon System Cost ($ in Millions) 1,655.176 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 1,655.176 Plus CY Advance Procurement ($ in Millions) - - - - - 51.646 38.419 21.511 - 21.511 - Total Obligation Authority ($ in Millions) 1,655.176 FY 2027 Total - - - - - 51.646 38.419 21.511 - 21.511 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Hardware Cost Recurring Cost CMWS A-Kit Fixed Wing Installation 2,974.222 18 53.536 - - - - - - - - - - - - - - - CMWS A-Kit Rotary Wing Installation 657.000 10 6.570 - - - - - - - - - - - - - - - CMWS Gen 3 ECU Hardware 261.671 432 113.042 - - - - - - - - - - - - - - - CMWS Gen 3 User Data Module (UDM) - - 9.607 - - - - - - - - - - - - - - - CMWS Other Recurring Prod (Software/Engineer) - - 216.628 - - 11.704 - - 5.147 - - 5.485 - - - - - 5.485 CMWS Systems Engineering - - 36.643 - - 4.805 - - 3.945 - - 4.197 - - - - - 4.197 CMWS Program Management - - 35.164 - - 1.590 - - 1.373 - - 1.310 - - - - - 1.310 CMWS Systems Test and Evaluation - - 94.105 - - 3.847 - - 3.462 - - 2.370 - - - - - 2.370 JUONS SO-0010 A-Kit Procurement 432.174 69 29.820 - - - - - - - - - - - - - - - JUONS SO-0010 A-Kit Installation 376.406 69 25.972 - - - - - - - - - - - - - - - JUONS SO-0010 B-Kit Procurement 2,824.200 45 127.089 - - - - - - - - - - - - - - - LI 5397AZ3517 - CMWS Army UNCLASSIFIED Page 4 of 8 P-1 Line #28 Volume 1 - 204 === page 241 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 5397AZ3517 / CMWS Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: AZ3517 / CMWS MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) JUONS SO-0010 Systems Engineering - - 18.138 - - 0.318 - - - - - - - - - - - - JUONS SO-0010 Program Management - - 15.413 - - 0.102 - - - - - - - - - - - - JUONS SO-0010 Systems Test & Evaluation - - 12.538 - - - - - - - - - - - - - - - JUONS SO-0010 Fielding/FSR Support/ Depot/Demod - - 109.404 - - 3.538 - - - - - - - - - - - - JUONS SO-0010 Software/Engineering Support - - 26.723 - - - - - - - - - - - - - - - 64 64.982 - - - - - - - - - - - - - - - Phase 3 ATW/ CIRCM QRC B-Kit Procurement (†) 1,015.344 CIRCM QRC Systems Engineering - - 6.704 - - - - - - - - - - - - - - - CIRCM QRC Program Management - - 6.614 - - - - - - - - - - - - - - - 155 24.465 - - - - - - - - - - - - - - - - 5.920 - - - - - - - - - - - - - - - 378 56.086 - - 0.326 - - - - - - - - - - - - - 57.024 - - 2.321 - - 2.411 - - 0.798 - - - - - 0.798 436 253.050 - - - - - - - - - - - - - - - - 18.953 - - - - - - - - - - - - - - - CIRCM QRC A-Kit Installation 157.839 CIRCM QRC ST&E Phase 4 LIMWS AKit Procurement and (†) Install 148.376 LIMWS Systems Engineering Program Management Phase 4 LIMWS QRC (†) B-Kit Procurement 580.390 LIMWS QRC Additional B-Kit Hardware (ALE-47) - CIRCM QRC A-Kit Procurement 378.650 60 22.719 - - - - - - - - - - - - - - - CIRCM Additional Hardware-l Generators 50.550 20 1.011 - - - - - - - - - - - - - - - LIMWS Engineering Services - - 51.184 - - 7.817 - - 4.026 - - - - - - - - - LIMWS Systems Test & Evaluation - - 19.118 - - 5.260 - - 1.198 - - - - - - - - - LI 5397AZ3517 - CMWS Army UNCLASSIFIED Page 5 of 8 P-1 Line #28 Volume 1 - 205 === page 242 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 5397AZ3517 / CMWS Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: AZ3517 / CMWS MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) Subtotal: Recurring Cost FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - 1,518.222 - - 41.628 - - 21.562 - - 14.160 - - - - - 14.160 CMWS Other Modifications (5th Sensor and P3I) - - 5.805 - - - - - - - - - - - - - - - CMWS Other Procurement - - 3.176 - - - - - - - - - - - - - - - FY 2019 Rapid Prototyping Fund - - 0.613 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 9.594 - - - - - - - - - - - - - - - - - 1,527.816 - - 41.628 - - 21.562 - - 14.160 - - - - - 14.160 CIRCM ICS-CLS - - 8.060 - - - - - - - - - - - - - - - JUONS FIeldimg and ICS-CLS - - 3.108 - - - - - - - - - - - - - - - LIMWS ICS-CLS - - 56.689 - - 2.705 - - 12.546 - - 7.351 - - - - - 7.351 LIMWS Fielding - - 13.053 - - 7.313 - - 4.311 - - - - - - - - - Subtotal: Recurring Cost - - 80.910 - - 10.018 - - 16.857 - - 7.351 - - - - - 7.351 LIMWS Training/ Equipment - - 2.990 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 2.990 - - - - - - - - - - - - - - - - - 83.900 - - 10.018 - - 16.857 - - 7.351 - - - - - 7.351 - - 35.058 - - - - - - - - - - - - - - - - - 35.058 - - - - - - - - - - - - - - - Non Recurring Cost Subtotal: Hardware Cost Logistics Cost Recurring Cost Non Recurring Cost Subtotal: Logistics Cost Support - Fielding Cost Fielding Subtotal: Support - Fielding Cost Support - Training Cost - - 8.403 - - - - - - - - - - - - - - - Subtotal: Support - Training Cost Equipment - - 8.403 - - - - - - - - - - - - - - - Gross/Weapon System Cost - - 1,655.176 - - 51.646 - - 38.419 - - 21.511 - - - - - 21.511 LI 5397AZ3517 - CMWS Army UNCLASSIFIED Page 6 of 8 P-1 Line #28 Volume 1 - 206 === page 243 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 10 P-1 Line Item Number / Title: 5397AZ3517 / CMWS ID Code (A=Service Ready, B=Not Service Ready) : Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority Item Number / Title [DODIC]: AZ3517 / CMWS MDAP/MAIS Code: FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total - - - - - 51.646 38.419 21.511 - 21.511 - - - - - 51.646 38.419 21.511 - 21.511 indicates the presence of a P-5a LI 5397AZ3517 - CMWS Army UNCLASSIFIED Page 7 of 8 P-1 Line #28 Volume 1 - 207 === page 244 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 10 P-1 Line Item Number / Title: 5397AZ3517 / CMWS O O C Award Date Date of First Delivery FY Contractor and Location Phase 3 ATW/CIRCM QRC B-Kit Procurement ✓ 2018 Northrop Grumman / Rolling Meadows, IL SS / FFP AMCOM Contracting Command, RSA Dec 2017 Dec 2018 64 1,015.344 N Phase 4 LIMWS A-Kit Procurement and Install ✓ 2019 BAE Systems / Nashua, NH C / FFP AMCOM Contracting Command, RSA Nov 2018 Aug 2019 86 78.047 N Phase 4 LIMWS A-Kit Procurement and Install ✓ 2020 BAE Systems / Nashua, NH C / FFP AMCOM Contracting Command, RSA Oct 2019 Apr 2020 201 71.960 N Phase 4 LIMWS A-Kit Procurement and Install ✓ 2021 Tyonek / Huntsville, AL C / FFP AMCOM Contracting Command, RSA Jun 2021 Jan 2022 34 75.455 N Phase 4 LIMWS A-Kit Procurement and Install 2022 Tyonek / Huntsville, AL C / FFP AMCOM Contracting Command, RSA Dec 2021 Jun 2022 29 82.658 N Phase 4 LIMWS A-Kit Procurement and Install 2024 Tyonek / Huntsville, AL C / FFP AMCOM Contracting Command, RSA Feb 2024 Aug 2024 11 36.727 N Cost Elements Method/Type or Funding Vehicle Item Number / Title [DODIC]: AZ3517 / CMWS Location of PCO Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty (Each) Phase 4 LIMWS QRC B-Kit Procurement ✓ 2018 BAE Systems / Nashua, NH C / FFP AMCOM Contracting Command, RSA May 2018 Sep 2019 36 626.090 N Phase 4 LIMWS QRC B-Kit Procurement ✓ 2019 BAE Systems / Nashua, NH C / FFP AMCOM Contracting Command, RSA Mar 2020 Feb 2021 100 626.090 N Phase 4 LIMWS QRC B-Kit Procurement ✓ 2020 BAE Systems / Nashua, NH C / FFP AMCOM Contracting Command, RSA Jan 2020 Dec 2021 100 626.090 N Phase 4 LIMWS QRC B-Kit Procurement ✓ 2021 BAE Systems / Nashua, NH C / FFP AMCOM Contracting Command, RSA Jan 2021 Oct 2022 100 626.090 N 2022 BAE Systems / Nashua, NH C / FFP AMCOM Contracting Command, RSA Sep 2022 Aug 2023 100 626.090 N Phase 4 LIMWS QRC B-Kit Procurement LI 5397AZ3517 - CMWS Army UNCLASSIFIED Page 8 of 8 P-1 Line #28 RFP Issue Date Volume 1 - 208 === page 245 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 04: Support Equipment and Facilities / BSA 5399AZ3537 / Common Infrared Countermeasures (CIRCM) 10: Ground Support Avionics Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 446 Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 715 100 71 36 - 36 24 12 12 12 1,452.249 257.854 225.647 140.636 - 140.636 115.999 82.467 80.919 88.265 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 1,452.249 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 1,452.249 - - 257.854 - 225.647 - - 257.854 - 140.636 - 225.647 - - 140.636 - 140.636 - - 140.636 115.999 115.999 To FY 2031 Complete - - - 82.467 80.919 88.265 - - - 82.467 80.919 88.265 Total 1,160.780 982 3,604.816 1,160.780 3,604.816 1,160.780 3,604.816 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) 2,031.117 2,578.540 3,178.127 3,906.556 - 3,906.556 4,833.292 6,872.250 6,743.250 7,355.417 - 3,670.892 Description: Army Procurement Objective (APO) = 1,988 (B-Kits only) On April 15, 2022, the Army Requirements Oversight Council (AROC) approved an APO increase for CIRCM B-Kits from 1781 to 1988. CIRCM (AZ3537) CIRCM is the next generation lightweight, laser-based Infrared Countermeasure (IRCM) component that interfaces with both the Army's Common Missile Warning System (CMWS), Limited Interim Missile Warning System (LIMWS), Advanced Threat Warner (ATW), and future Improved Threat Detection System (ITDS) to defeat current and emerging missile threats that use multispectral technology for rotary-wing, tilt-rotor and small fixed-wing aircraft across the Department of War (DoW). CIRCM receives an angular bearing hand-off from the Missile Warning System (MWS), employs a pointing and tracking system which acquires the handed-over threat and tracks the incoming missile during and after motor burnout. CIRCM jams the missile by using modulated laser energy in the missile seeker band, thus degrading the tracking capability of the missile and causing it to miss the aircraft. CIRCM is utilizing Open Systems Architecture which allows flexibility with software and hardware refreshes to keep pace with future threats. CIRCM is part of the suite of Aircraft Survivability Equipment (ASE) Mission Equipment for Multi-Mission Vertical Takeoff (MV)-75 Future Long-Range Assault Aircraft (FLRAA). The CIRCM A-Kit includes mounting hardware, wiring harnesses, and other components necessary to install and interface the mission kit on host aircraft. The A-Kit ensures the mission kit is functionally and physically operational with a specific host aircraft type. The CIRCM B-Kit is the mission kit (laser, pointer tracker, and processor) required to achieve near spherical coverage for an aircraft. CIRCM Full Rate Production (FRP) Decision was approved April 13, 2021, and a five-year Indefinite Delivery Indefinite Quantity (IDIQ) contract was awarded to Northrop Grumman Systems Corporation (NGSC) on April 30, 2021 for up to 596 B-Kits with options for Engineering Services, Repairs, and Contractor Logistic Support Services. CIRCM has executed all five delivery orders for B-Kits under the FRP contract and deliveries have begun. The full rate production APB was approved July 2021, and the program completed the Initial Operational Capability (IOC) threshold date of September 2022. CIRCM is utilizing Original Equipment Manufacture (OEM) contractor logistics to support initial fielding of the system. The program is planning to transition to organic depot support through a Private-Public Partnership in FY 2027. Secondary Distribution Army Quantity Total Obligation Authority Total: Quantity FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 100 71 36 - 36 24 12 12 12 257.854 225.647 140.636 - 140.636 115.999 82.467 80.919 88.265 100 71 36 - 36 24 12 12 12 LI 5399AZ3537 - Common Infrared Countermeasures (CIRCM) Army UNCLASSIFIED Page 1 of 11 P-1 Line #29 Volume 1 - 209 === page 246 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 04: Support Equipment and Facilities / BSA 5399AZ3537 / Common Infrared Countermeasures (CIRCM) 10: Ground Support Avionics Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 446 Secondary Distribution Secondary Distribution Total Obligation Authority FY 2025 FY 2026 257.854 LI 5399AZ3537 - Common Infrared Countermeasures (CIRCM) Army 225.647 FY 2027 Base FY 2027 OOC 140.636 UNCLASSIFIED Page 2 of 11 FY 2027 Total - FY 2028 140.636 115.999 P-1 Line #29 FY 2029 82.467 FY 2030 FY 2031 80.919 88.265 Volume 1 - 210 === page 247 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 04: Support Equipment and Facilities / BSA 5399AZ3537 / Common Infrared Countermeasures (CIRCM) 10: Ground Support Avionics Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 446 Exhibits Schedule Exhibit Type Title* P-5 AZ3537 / Common Infrared Countermeasures (CIRCM) P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code P-5a, P-21 Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 715 / 1,452.249 100 / 257.854 71 / 225.647 36 / 140.636 - / - 36 / 140.636 715 / 1,452.249 100 / 257.854 71 / 225.647 36 / 140.636 - / - 36 / 140.636 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 dollars will fund procurement of CIRCM hardware, integration, testing, software updates, jam code updates, Systems Engineering Program Management (SEPM), fielding, and sustainment. FY 2026 to FY 2027 funding decrease due to reduction in procurement quantities. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 5399AZ3537 - Common Infrared Countermeasures (CIRCM) Army UNCLASSIFIED Page 3 of 11 P-1 Line #29 Volume 1 - 211 === page 248 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 5399AZ3537 / Common Infrared Countermeasures (CIRCM) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: AZ3537 / Common Infrared Countermeasures (CIRCM) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2026 FY 2027 Total 71 36 - 36 1,452.249 257.854 225.647 140.636 - 140.636 - - 1,452.249 Plus CY Advance Procurement ($ in Millions) - 257.854 - Total Obligation Authority ($ in Millions) FY 2027 OOC 100 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2027 Base 715 - 1,452.249 - 225.647 - 257.854 - 140.636 - 225.647 - - 140.636 - 140.636 - - 140.636 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 2,031.117 - 2,578.540 - 3,178.127 - 3,906.556 - - 3,906.556 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost CIRCM A-Kit Manufacturing/ (†) Installation CIRCM B-Kit Manufacturing (†) Other Recurring Production Phase 3 CIRCM QRC B-Kit Manufacturing CIRCM QRC A-Kit Manufacturing/Installs B-Kit Manufacturing to Support Phase 4 LIMWS QRC 63.217 1,770 111.894 169.050 160 27.048 105.749 187 19.775 150.779 172 25.934 - - - 150.779 172 25.934 1,163.261 629 731.691 1,641.650 100 164.165 1,717.583 84 144.277 1,888.444 36 67.984 - - - 1,888.444 36 67.984 - 92.052 - - 12.972 - - 11.594 - - 10.460 - - - - - 10.460 107 133.874 - - - - - - - - - - - - - - - - 27.125 - - - - - - - - - - - - - - - 11.439 - - - - - - - - - - - - - - - 1,251.159 1,271.000 9 CIRCM QRC SEPM - - 39.921 - - - - - - - - - - - - - - - CIRCM QRC Testing - - 15.634 - - - - - - - - - - - - - - - CIRCM QRC Training - - 5.693 - - - - - - - - - - - - - - - CIRCM QRC Fielding - - 41.411 - - - - - - - - - - - - - - - CIRCM QRC Software - - 3.458 - - - - - - - - - - - - - - - CIRCM QRC Rapid Prototyping Fund - - 0.033 - - - - - - - - - - - - - - - LI 5399AZ3537 - Common Infrared Countermeasures (CIRCM) Army UNCLASSIFIED Page 4 of 11 P-1 Line #29 Volume 1 - 212 === page 249 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 5399AZ3537 / Common Infrared Countermeasures (CIRCM) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: AZ3537 / Common Infrared Countermeasures (CIRCM) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) CIRCM QRC Engineering Changes - - 1.440 - - - - - - - - - - - Subtotal: Recurring Cost - - 1,215.665 - - 204.185 - - 175.646 - - 104.378 - - - - - 104.378 - - 3.302 - - 6.000 - - 11.513 - - 10.555 - - - - - 10.555 30 13.955 - - - - - - - - - - - - - - - - - 17.257 - - 6.000 - - 11.513 - - 10.555 - - - - - 10.555 - - 1,232.922 - - 210.185 - - 187.159 - - 114.933 - - - - - 114.933 Jam Code Updates/ Software Support - - 17.664 - - 2.276 - - 1.893 - - 1.500 - - - - - 1.500 Cyber Security - - 8.972 - - 1.052 - - 1.000 - - 1.000 - - - - - 1.000 - - 26.636 - - 3.328 - - 2.893 - - 2.500 - - - - - 2.500 - - 26.636 - - 3.328 - - 2.893 - - 2.500 - - - - - 2.500 Technical Publications - - 0.463 - - 0.276 - - 0.300 - - 0.300 - - - - - 0.300 Subtotal: Support - Data Cost - - 0.463 - - 0.276 - - 0.300 - - 0.300 - - - - - 0.300 - - - - - 0.351 - - 0.367 - - 0.325 - - - - - 0.325 - - - - - 0.351 - - 0.367 - - 0.325 - - - - - 0.325 - - 91.321 - - 16.280 - - 12.837 - - 8.428 - - - - - 8.428 - - 91.321 - - 16.280 - - 12.837 - - 8.428 - - - - - 8.428 System Engineering - - 80.179 - - 20.775 - - 17.991 - - 11.150 - - - - - 11.150 Subtotal: Support - System Engineering Cost - - 80.179 - - 20.775 - - 17.991 - - 11.150 - - - - - 11.150 - 17.252 - - 6.659 - - 4.100 - - 3.000 - - - - - 3.000 - - - - Non Recurring Cost Depot Stand-up CIRCM QRC Retrofit 465.167 Subtotal: Non Recurring Cost Subtotal: Flyaway Cost Software Cost Recurring Cost Subtotal: Recurring Cost Subtotal: Software Cost Support - Data Cost Support - Engineering Change Proposals Cost Engineering Change Proposals Subtotal: Support Engineering Change Proposals Cost Support - Fielding Cost Fielding Subtotal: Support - Fielding Cost Support - System Engineering Cost Support - System Test and Evaluation Cost Test and Evaluation Support - LI 5399AZ3537 - Common Infrared Countermeasures (CIRCM) Army UNCLASSIFIED Page 5 of 11 P-1 Line #29 Volume 1 - 213 === page 250 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 5399AZ3537 / Common Infrared Countermeasures (CIRCM) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 10 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: AZ3537 / Common Infrared Countermeasures (CIRCM) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Subtotal: Support - System Test and Evaluation Cost Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) - - 17.252 - - 6.659 - - 4.100 - - 3.000 - - - - - 3.000 - - 3.477 - - - - - - - - - - - - - - - - - 3.477 - - - - - - - - - - - - - - - - - - Support - Training Cost Services Subtotal: Support - Training Cost Gross/Weapon System Cost 2,031.117 715 1,452.249 2,578.540 100 257.854 3,178.127 71 225.647 3,906.556 36 140.636 3,906.556 36 140.636 Remarks: B-Kit manufacturing unit cost increase is due to loss of economies of scale due to buying less B-kits than the previous year. Additionally, the B-Kits will contain the next generation Jupiter Laser, which is more expensive than the legacy Solaris Laser. The Jupiter Laser adds enhanced protection capability for current and emerging threats. The Open Systems Architecture (OSA) of the program enabled this technology insertion in a more efficient manner than traditional methods. The program will buy fewer quantities annually in order to stay within the budgeted funding profile. A-Kit unit price varies year to year due to multiple factors. The costs in this element reflect both manufacturing, installation and the cost of pods for Apache aircraft, but the quantities reflect only the quantity of AKits purchased. A-Kit manufacturing costs vary greatly for different aircraft platforms and the number of installs across platforms changes from year to year due to aircraft availability and the Regionally Aligned Readiness and Modernization Model (ReARMM). Fielding decrease in FY 2027 (from FY 2026) is due to a decrease in Field Service Representative (FSR) support required and a decrease in repairs needed as the system reliability improves and the user becomes more familiar with the system. The Prior Year quantity of 745 that is reported under the Flyaway Recurring Cost elements for CIRCM B-Kit Manufacturing, Phase 3 CIRCM Quick Reaction Capability (QRC) B-Kit Manufacturing, and B-Kit Manufacturing to Support Phase 4 LIMWS QRC are correct. The Gross/Weapon System Cost quantity of 715 is being pulled from the P40 and cannot be updated. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total 100 71 36 - 36 257.854 225.647 140.636 - 140.636 100 71 36 - 36 257.854 225.647 140.636 - 140.636 indicates the presence of a P-5a LI 5399AZ3537 - Common Infrared Countermeasures (CIRCM) Army UNCLASSIFIED Page 6 of 11 P-1 Line #29 Volume 1 - 214 === page 251 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Army Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 10 O O C Cost Elements CIRCM A-Kit Manufacturing/ (†) Installation CIRCM A-Kit Manufacturing/ (†) Installation CIRCM A-Kit Manufacturing/ (†) Installation CIRCM A-Kit Manufacturing/ (†) Installation (†) CIRCM B-Kit Manufacturing (†) CIRCM B-Kit Manufacturing (†) CIRCM B-Kit Manufacturing (†) CIRCM B-Kit Manufacturing (†) P-1 Line Item Number / Title: 5399AZ3537 / Common Infrared Countermeasures (CIRCM) Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: AZ3537 / Common Infrared Countermeasures (CIRCM) Specs Date Unit Cost Avail Revision Now? Available ($ K) Qty FY Contractor and Location 2024 Logistics Support Facility (LSF) / Army Aviation Field Maintenance Facility (AFMD) / Redstone Arsenal MIPR HQ ACC, Redstone Arsenal, AL Jan 2024 Jun 2024 346 103.538 N 2025 Logistics Support Facility (LSF) / Army Aviation Field Maintenance Facility (AFMD) / Redstone Arsenal MIPR HQ ACC, Redstone Arsenal, AL Jan 2025 Jul 2025 160 169.050 N 2026 Logistics Support Facility (LSF) / Army Aviation Field Maintenance Facility (AFMD) / Redstone Arsenal MIPR HQ ACC, Redstone Arsenal, AL Jan 2026 Jul 2026 187 105.749 N 2027 Logistics Support Facility (LSF) / Army Aviation Field Maintenance Facility (AFMD) / Redstone Arsenal MIPR HQ ACC. Redstone Arsenal, AL Jan 2027 Jul 2027 172 150.779 N 2024 Northrop Grumman Systems Corp / Rolling Meadows C / FFP HQ ACC, Redstone Arsenal, AL Nov 2023 Sep 2025 125 1,201.328 N 2025 Northrop Grumman Systems Corp / Rolling Meadows C / FFP HQ ACC. Redstone Arsenal, AL Nov 2024 Sep 2026 100 1,641.650 N 2026 Northrop Grumman Systems Corp / Rolling Meadows C / FFP HQ ACC, Redstone Arsenal, AL Nov 2025 Aug 2027 84 1,717.583 N 2027 Northrop Grumman Systems Corp / Rolling Meadows C / FFP HQ ACC, Redstone Arsenal, AL Nov 2026 Aug 2028 36 1,888.444 N (Each) RFP Issue Date indicates the presence of a P-21 Remarks: FY 2023 - FRP Qty = 125 FY 2024 - FRP Qty = 125 FY 2025 - FRP Qty = 100 FY 2026 - FRP Qty = 84 FY 2027 - FRP Qty = 36 LI 5399AZ3537 - Common Infrared Countermeasures (CIRCM) Army UNCLASSIFIED Page 7 of 11 P-1 Line #29 Volume 1 - 215 === page 252 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 5399AZ3537 / Common Infrared Countermeasures (CIRCM) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: AZ3537 / Common Infrared Countermeasures (CIRCM) Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P CIRCM A-Kit Manufacturing/Installation Prior Years Deliveries: 1424 1 2024 ARMY 346 0 346 1 2025 ARMY 160 0 160 A - - - - - 20 20 20 20 20 20 20 20 1 2026 ARMY 187 0 187 187 1 2027 ARMY 172 0 172 172 A - 20 20 20 20 20 20 20 20 26 - - - - - 15 15 15 115 CIRCM B-Kit Manufacturing Prior Years Deliveries: 504 2 2024 ARMY 125 0 125 2 2025 ARMY 100 0 100 2 2026 ARMY 84 0 84 2 2027 ARMY 36 0 36 A - - - - - - - - - - - - - - - - - - - - - - 10 115 A - - - - - - - - - - - 100 84 36 O C T N O V D E C J A N F E B LI 5399AZ3537 - Common Infrared Countermeasures (CIRCM) Army M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #29 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 216 === page 253 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 5399AZ3537 / Common Infrared Countermeasures (CIRCM) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: AZ3537 / Common Infrared Countermeasures (CIRCM) Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P CIRCM A-Kit Manufacturing/Installation Prior Years Deliveries: 1424 1 2024 ARMY 346 320 26 20 6 1 2025 ARMY 160 45 115 15 15 1 2026 ARMY 187 0 187 1 2027 ARMY 172 0 172 0 15 15 A - 15 15 15 10 - - - - 0 - 15 15 15 15 15 15 15 A - 15 15 15 15 15 7 - - - - - 15 0 15 15 127 CIRCM B-Kit Manufacturing Prior Years Deliveries: 504 2 2024 ARMY 125 10 115 10 10 10 10 10 10 11 11 11 11 11 2 2025 ARMY 100 0 100 - - - - - - - - - - - 2 2026 ARMY 84 0 84 A - - - - - - - - - - 2 2027 ARMY 36 0 36 0 9 9 - 9 - 9 - - A O C T N O V D E C J A N F E B LI 5399AZ3537 - Common Infrared Countermeasures (CIRCM) Army M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 11 S E P O C T N O V 9 - D E C 9 - J A N 9 - F E B P-1 Line #29 9 - M A R 9 - A P R 9 - M A Y 10 J U N 0 - 7 J U L 7 A U G - 70 36 S E P Volume 1 - 217 === page 254 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 5399AZ3537 / Common Infrared Countermeasures (CIRCM) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 10 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Item Number / Title [DODIC]: AZ3537 / Common Infrared Countermeasures (CIRCM) Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E CIRCM A-Kit Manufacturing/Installation Prior Years Deliveries: 1424 1 2024 ARMY 346 346 0 0 1 2025 ARMY 160 160 0 0 1 2026 ARMY 187 187 0 1 2027 ARMY 172 45 127 0 15 15 15 15 15 15 15 15 7 0 CIRCM B-Kit Manufacturing Prior Years Deliveries: 504 2 2024 ARMY 125 125 0 2 2025 ARMY 100 100 0 2 2026 ARMY 84 14 70 2 2027 ARMY 36 0 36 0 0 7 7 O C T 8 N O V 8 D E C 8 J A N 8 F E B LI 5399AZ3537 - Common Infrared Countermeasures (CIRCM) Army 8 M A R 8 A P R 8 M A Y 0 J U N J U L 7 A U G UNCLASSIFIED Page 10 of 11 7 S E P 7 O C T 7 N O V 8 D E C 0 J A N F E B P-1 Line #29 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 218 === page 255 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Army P-1 Line Item Number / Title: 5399AZ3537 / Common Infrared Countermeasures (CIRCM) Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 10 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: AZ3537 / Common Infrared Countermeasures (CIRCM) Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Logistics Support Facility (LSF) / Army Aviation Field Maintenance Facility (AFMD) - Redstone Arsenal 10 15 20 0 0 12 12 0 0 4 4 2 Northrop Grumman Systems Corp - Rolling Meadows 7 11 20 0 0 14 14 0 0 14 14 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 5399AZ3537 - Common Infrared Countermeasures (CIRCM) Army UNCLASSIFIED Page 11 of 11 P-1 Line #29 Volume 1 - 219 === page 256 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 04: Support Equipment and Facilities / BSA 5212AZ3100 / Common Ground Equipment 30: Other Support Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0603801A, 0605830A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 1,407.698 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 1,407.698 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 1,407.698 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 31.937 37.489 29.778 - 29.778 30.710 23.427 23.279 23.511 - - - - - - - - - - - 31.937 37.489 29.778 - 29.778 30.710 23.427 23.279 23.511 - - - - - - - - - - - 31.937 37.489 29.778 - 29.778 30.710 23.427 23.279 23.511 - Total 1,607.829 1,607.829 1,607.829 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Aviation Ground Support Equipment (AGSE) Product Office develops, delivers and modernizes critical ground support equipment that enables the maintenance of both the Army's enduring fleet of rotary wing aircraft and the Future Long Range Assault Aircraft (FLRAA). This is accomplished by providing aircraft diagnostic, repair and servicing capabilities essential to support aircraft maintenance and operational readiness. Priority efforts in the near term include Aviation Ground Power Unit (AGPU 1.1) and the development of an AGPU 1.1 design/modification required to support FLRAA. The AGSE portfolio consists of 24 products (45 Line Item Numbers). Continued investments in AGSE enable Army Aviation to rapidly deploy, operate and sustain operations across the globe in a multi-domain environment, supporting the National Defense Strategy and National Military Strategy. Secondary Distribution Army Quantity Total: Secondary Distribution FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 31.937 37.489 17.240 - 17.240 30.710 23.427 23.279 23.511 Quantity - - - - - - - - - Total Obligation Authority - - 12.538 - 12.538 - - - - Quantity - - - - - - - - - 31.937 37.489 29.778 - 29.778 30.710 23.427 23.279 23.511 Total Obligation Authority ANG FY 2025 Total Obligation Authority LI 5212AZ3100 - Common Ground Equipment Army UNCLASSIFIED Page 1 of 4 P-1 Line #30 Volume 1 - 220 === page 257 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 04: Support Equipment and Facilities / BSA 5212AZ3100 / Common Ground Equipment 30: Other Support ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: 0603801A, 0605830A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 AZ3520 / AVIATION GROUND SUPPORT EQUIPMENT - / 1,407.698 - / 31.937 - / 37.489 - / 29.778 - / - - / 29.778 P-40 Total Gross/Weapon System Cost - / 1,407.698 - / 31.937 - / 37.489 - / 29.778 - / - - / 29.778 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Funding will procure Aviation Ground Power Unit (AGPU) 1.1 systems. The Army Requirement Oversight Committee (AROC) approved an Army Acquisition Objective (AAO) of 157 AGPU 1.1s to support a critical capability gap (maintenance/operational) for the CH-47 and AH-64 fleet. In accordance with section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110 - 181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 5212AZ3100 - Common Ground Equipment Army UNCLASSIFIED Page 2 of 4 P-1 Line #30 Volume 1 - 221 === page 258 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 5212AZ3100 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: AZ3520 / AVIATION GROUND SUPPORT EQUIPMENT MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 31.937 37.489 29.778 - 29.778 - Gross/Weapon System Cost ($ in Millions) 1,407.698 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 1,407.698 Plus CY Advance Procurement ($ in Millions) - - - - - 31.937 37.489 29.778 - 29.778 - Total Obligation Authority ($ in Millions) 1,407.698 FY 2027 Total - - - - - 31.937 37.489 29.778 - 29.778 - - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Thousands) - 56,307.920 - 1,596.850 1,874.450 1,567.263 - - 1,567.263 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost Aviation Ground Power Unit 1.1 (AGPU 1.1) - - 51.411 - - 31.181 - - 29.489 - - 29.778 - - - - - 29.778 Aviation Ground Power Unit 1.0 (AGPU 1.0) 124.664 8,246 1,027.979 - - - - - - - - - - - - - - - Avn Light Utility Mobile Maint 43.671 1,100 48.038 - - - - - - - - - - - - - - - Modernized Maintenance Stands - - 5.827 - - - - - - - - - - - - - - - Common Aviation Tool System 2.836 19,889 56.405 - - - - - - - - - - - - - - - 18,523.000 5 92.615 - - - - - - - - - - - - - - - 196.191 110 21.581 - - - - - - - - - - - - - - - - 14.584 - - - - - - - - - - - - - - - 62 30.162 - - - - - - - - - - - - - - - - 1.879 - - - - - - - - - - - - - - - Flexible Engine Diagnostics Sys SCAMP II Expeditionary Type 2 Unit Maint Aerial Recovery Kit Non-Destructive Test Equipment Tool Set, Aviation Intermediate Maintenance 486.484 - LI 5212AZ3100 - Common Ground Equipment Army UNCLASSIFIED Page 3 of 4 P-1 Line #30 Volume 1 - 222 === page 259 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 5212AZ3100 / Common Ground Equipment Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: AZ3520 / AVIATION GROUND SUPPORT EQUIPMENT MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Pitot Static Test Set Unit Cost ($ K) 300.257 FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) 183 54.947 - - - - - - - - - - - - - - - - - - - - 8.000 - - - - - - - - - 0.756 - - - - - - - - - - - - Non-Destructive Digital Inspection Tool - - - Standard Aircraft Towing System - - - Subtotal: Recurring Cost - - 1,405.428 - - 31.937 - - 37.489 - - 29.778 - - - - - 29.778 - - 1,405.428 - - 31.937 - - 37.489 - - 29.778 - - - - - 29.778 - - 2.285 - - - - - - - - - - - - - - - - - 2.285 - - - - - - - - - - - - - - - - 1,407.698 - 31.937 - 37.489 - 29.778 - - - - 29.778 Subtotal: Flyaway Cost 126.000 6 Support - Program Management Cost Government Management Subtotal: Support - Program Management Cost Gross/Weapon System Cost 56,307.920 1,596.850 Secondary Distribution Army Quantity Total: Secondary Distribution FY 2025 1,567.263 FY 2027 Base FY 2026 1,567.263 FY 2027 OOC FY 2027 Total - - - - - 31.937 37.489 17.240 - 17.240 Quantity - - - - - Total Obligation Authority - - 12.538 - 12.538 Total Obligation Authority ANG 1,874.450 Quantity Total Obligation Authority LI 5212AZ3100 - Common Ground Equipment Army - - - - - 31.937 37.489 29.778 - 29.778 UNCLASSIFIED Page 4 of 4 P-1 Line #30 Volume 1 - 223 === page 260 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 04: Support Equipment and Facilities / BSA 6380AZ3110 / Aircrew Integrated Systems 30: Other Support Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0603827A, 0604601A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 1,078.449 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 1,078.449 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 1,078.449 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 14.478 14.986 15.229 - 15.229 15.280 15.417 15.352 - - - - - - - - 14.478 14.986 15.229 - 15.229 15.280 15.417 15.352 - - - - - - - - 14.478 14.986 15.229 - 15.229 15.280 15.417 15.352 To FY 2031 Complete - Total - 15.506 Continuing - Continuing - 15.506 Continuing - Continuing - - 15.506 Continuing Continuing (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: Aircrew Integrated Systems funds Air Soldier System (Air SS). The Air Soldier system provides Army rotary wing aircrews with capabilities to enhance lethality through improved situational awareness and communication while also providing protective mission and survival equipment. Air SS consists of mission electronics integrated with the aircraft and clothing and individual equipment, that enable the aircrew member to successfully perform their missions while protecting, sustaining, and facilitating the safe return to friendly forces in the event of a downed aircraft scenario, all while providing a lethal aviation capability. Air SS is the phased replacement of the legacy Air Warrior (AW) system that addresses capability gaps while equipping Army aircrews with protective, survival, and personal mission equipment, including modernized mission electronics tools that improve aircrew Situational Awareness (SA) and reduced Soldier load through reductions in bulk and weight of mission and survival gear. These efforts support targeted modernization of the enduring Aviation fleet. Recent and future efforts are shifting from program- or platform-specific hardware and software solutions to common, integrated air and ground solutions that align with the Program Acquisition Executive (PAE) strategy and Transformation and Training Command (T2COM) priorities. Secondary Distribution Army Quantity Total Obligation Authority ANG Quantity Total Obligation Authority AR Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 6380AZ3110 - Aircrew Integrated Systems Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 10.828 9.826 15.229 - 15.229 15.280 15.417 15.352 15.506 - - - - - - - - - 2.738 4.224 - - - - - - - - - - - - - - - - 0.912 0.936 - - - - - - - - - - - - - - - - 14.478 14.986 15.229 - 15.229 15.280 15.417 15.352 15.506 UNCLASSIFIED Page 1 of 4 P-1 Line #31 Volume 1 - 224 === page 261 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 04: Support Equipment and Facilities / BSA 6380AZ3110 / Aircrew Integrated Systems 30: Other Support ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: 0603827A, 0604601A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 AZ3110 / Aircrew Integrated Systems - / 1,078.449 - / 14.478 - / 14.986 - / 15.229 - / - - / 15.229 P-40 Total Gross/Weapon System Cost - / 1,078.449 - / 14.478 - / 14.986 - / 15.229 - / - - / 15.229 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Funding in the amount of $15.229 million support Air SS requirements and continued production and fielding of Air SS capabilities to provide safety, sustainability, lethality, operations, and mission planning. Air SS provides improved capabilities for Transformation in Contact (TiC)/Next Generation Command and Control (NGC2), United States Southern Border, and Domestic Disaster Relief and First Responder missions to enhance lethality and Situational Awareness (SA). Procurement includes Nett Warrior-Aviation (NW-A) to replace paper DoW Flight Information Publications and aircraft publications, providing modernized SA and enabling air/ground convergence; Aircrew Combat Equipment (ACE) provides integrated and ergonomic next-generation flight survival vest and reductions in Soldier-worn bulk and weight, and improved flight helmets which provides lighter weight and improved functionality. These capabilities reduce Soldier load and enhance lethality, Situational Awareness, Safety, and Survivability. Funds also procure Air Soldier platform-mounted components necessary for airframe interface with the Air Soldier and installation of airframe integration kits. FY 2026 to FY 2027 Funding increase is due to the award of a competitive prime vendor contract. Prices and exercising option periods are based on actual cost. In accordance with Section 1815 of the 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the Active and Reserve Components of Armed Forces for homeland and defense missions, domestic emergency responses and providing military support to civil authorities. LI 6380AZ3110 - Aircrew Integrated Systems Army UNCLASSIFIED Page 2 of 4 P-1 Line #31 Volume 1 - 225 === page 262 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6380AZ3110 / Aircrew Integrated Systems Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: AZ3110 / Aircrew Integrated Systems MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 14.478 14.986 15.229 - 15.229 - Gross/Weapon System Cost ($ in Millions) 1,078.449 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 1,078.449 Plus CY Advance Procurement ($ in Millions) - - - - - 14.478 14.986 15.229 - 15.229 - Total Obligation Authority ($ in Millions) 1,078.449 FY 2027 Total - - - - - 14.478 14.986 15.229 - 15.229 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost Air SS Soldier Kits 4.751 16,088 76.433 8.620 1,342 11.568 8.754 1,404 12.290 9.035 1,426 12.884 - - - 9.035 1,426 12.884 Air Soldier System Airframe Kits 144.553 1,269 183.438 - - - - - - - - 0.296 - - - - - 0.296 Airframe Kit Install - - 25.823 - - - - - - - - 0.172 - - - - - 0.172 Manual - - 15.662 - - 0.165 - - 0.173 - - 0.135 - - - - - 0.135 New Equipment Training - - 6.815 - - 0.077 - - 0.081 - - 0.063 - - - - - 0.063 Initial Spares - - 19.838 - - 0.304 - - 0.318 - - 0.248 - - - - - 0.248 Support Equipment - - 10.828 - - 0.038 - - 0.040 - - 0.031 - - - - - 0.031 Systems Test and Evaluation - - 17.403 - - - - - - - - - - - - - - - Nonrecurring Engineering (NRE) - - 36.263 - - 0.062 - - 0.065 - - 0.051 - - - - - 0.051 Engineering Changes - - 14.942 - - 0.054 - - 0.056 - - 0.044 - - - - - 0.044 Systems Integration Engineering - - 14.069 - - 0.112 - - 0.117 - - 0.091 - - - - - 0.091 Program Management & Matrix Support - - 56.183 - - 1.440 - - 1.158 - - 0.903 - - - - - 0.903 Total Package Fielding - - 7.939 - - 0.612 - - 0.640 - - 0.274 - - - - - 0.274 Contract Logistics Support - - 9.954 - - 0.046 - - 0.048 - - 0.037 - - - - - 0.037 LI 6380AZ3110 - Aircrew Integrated Systems Army UNCLASSIFIED Page 3 of 4 P-1 Line #31 Volume 1 - 226 === page 263 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6380AZ3110 / Aircrew Integrated Systems Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: AZ3110 / Aircrew Integrated Systems MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Air Warrior ECPs Supporting Air SS Rqmts - - 18.158 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - 513.748 - - 14.478 - - 14.986 - - 15.229 - - - - - 15.229 Legacy/Air Wrrior Costs - - 564.701 - - - - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 564.701 - - - - - - - - - - - - - - - Subtotal: Flyaway Cost - - 1,078.449 - - 14.478 - - 14.986 - - 15.229 - - - - - 15.229 Gross/Weapon System Cost - - 1,078.449 - - 14.478 - - 14.986 - - 15.229 - - - - - 15.229 Non Recurring Cost Remarks: Unit Cost changes across the years reflect the different mix of subsystem components procured each year. The Air SS Soldier Kit component is the primary cost driver of the program, and fluctuations in quantities in a fiscal year can substantially change the overall program Unit Cost. The Air SS Aircraft Kit subsystem components and associated platform installation costs comprise the other bulk of hardware procured under this program, which also affects the overall program Unit Cost based on the quantities procured. The subsystem component quantities for each fiscal year are shown on the P-5 cost elements. Subsystem component procurement quantities are as follows: Aircrew Combat Equipment 2,400; Rotary Wing Helmet 2,250; Nett Warrior -Aviation HW 2,352; Mission Planning Adapters 156 FY2026 to FY2027 procurement cost increase are due to the award of a competitive prime vendor contract. Prices and exercising option periods are based on actual cost. Secondary Distribution Army Quantity Total Obligation Authority ANG Quantity Total Obligation Authority AR Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 6380AZ3110 - Aircrew Integrated Systems Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total - - - - - 10.828 9.826 15.229 - 15.229 - - - - - 2.738 4.224 - - - - - - - - 0.912 0.936 - - - - - - - - 14.478 14.986 15.229 - 15.229 UNCLASSIFIED Page 4 of 4 P-1 Line #31 Volume 1 - 227 === page 264 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 04: Support Equipment and Facilities / BSA 6818AA0050 / Air Traffic Control 30: Other Support Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0604633A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 1,795.253 1,795.253 1,795.253 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 27.428 24.213 11.044 - 11.044 9.782 9.880 9.867 9.966 - - - - - - - - - - - 27.428 24.213 11.044 - 11.044 9.782 9.880 9.867 9.966 - - - - - - - - - - - 27.428 24.213 11.044 - 11.044 9.782 9.880 9.867 9.966 - Total 1,897.433 1,897.433 1,897.433 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Tactical Airspace Integration System (TAIS) is the Army's program of record for Airspace Control (AC) and enroute Air Traffic Services (ATS). TAIS provides airspace management, planning, and dynamic execution capabilities at all echelons above Brigade, and enroute flight following ATS. TAIS is the only Army system with direct interface to the U.S. Air Force Air Operations Center (AOC) Weapon System for submission of the Army's requests for airspace from the Battlefield Coordination Detachment (BCD). Airspace Coordinating Measure Requests (ACMREQs) received from other mission command systems are passed to TAIS for approval or higher coordination. TAIS software supports Army commanders, airspace users, airspace managers, Army air traffic controllers, Joint Organizations, and Unified Action Partners (UAP) by providing digitized, multi-echelon planning and execution of airspace management and ATS. TAIS provides AC planning and enhanced AC execution; improved theater, intra-, and inter-Corps/Division ATS support; effective battlespace synchronization; and direct links to the Theater Air Ground System (TAGS) through interface with the automated airspace planning and communications systems of the Joint Force Air Component Commander (JFACC). TAIS is critical to commanders providing airspace control/management capabilities supporting Multi-Domain Operations, Next Generation Command and Control, and Fight Tonight. Funds in the Air Traffic Control (ATC) line support the acquisition of modernized Fixed Base ATC systems that provide real time airspace management and control that will ensure safety of aircraft operations. These ATC systems are required to maintain compliance with civil, military, domestic, and international ATC and combat identification requirements in accordance with federal mandates for systems operating within and transitioning through the National Airspace System (NAS) . Efforts include the Fixed Base systems, of which are the DoD Advanced Automation System (DAAS), the Digital Airport Surveillance Radar (DASR), and other navigational control aids that include the Army Airfield Automation System (AAAS), Interim Voice Switch Replacement (IVSR), Doppler VHF Omnidirectional Range (DVOR) system, NAS Voice Recorder (NVR), Precision Approach Radar (PAR2020), Flight Data In/Out (FDIO), and the Instrument Landing System (ILS) Program. Systems in the ATC portfolio ensure the Army has sufficient access to the airspace and equipment necessary to meet worldwide operational, training, exercise, test, and evaluation requirements for peacetime, contingency, and wartime operations as well as, support of international civil and military cooperation in the effective and efficient management of the NAS. Fixed Base ATC requirements will be met through the application of new technology solutions and Pre-Planned Product Improvement (P3I) of these systems resulting in highly reliable and safe ATC systems in accordance with the Joint DoD/Federal Aviation Administration (FAA) program to modernize the NAS and the FAA Next Gen program. It is imperative that the Army is funded to mirror the modernization effort of the FAA, as the Army and FAA rely on shared systems for safe control of airspace. Furthermore, the Department of War controls 20% of the national airspace. LI 6818AA0050 - Air Traffic Control Army UNCLASSIFIED Page 1 of 5 P-1 Line #32 Volume 1 - 228 === page 265 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 04: Support Equipment and Facilities / BSA 6818AA0050 / Air Traffic Control 30: Other Support Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0604633A Line Item MDAP/MAIS Code: N/A These airspace management systems align the Army in the comprehensive and cohesive effort to provide aviation security and defense of the US NAS in support of National Security Presidential Directive-47/ Homeland Security Presidential Directive-16 and the Strategy for Aviation Security, as described in Department of Defense Directive (DODD) 5030.19. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 6818AA0050 - Air Traffic Control Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 27.428 24.213 11.044 - 11.044 9.782 9.880 9.867 9.966 - - - - - - - - - 27.428 24.213 11.044 - 11.044 9.782 9.880 9.867 9.966 UNCLASSIFIED Page 2 of 5 P-1 Line #32 Volume 1 - 229 === page 266 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 04: Support Equipment and Facilities / BSA 6818AA0050 / Air Traffic Control 30: Other Support ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: 0604633A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 AA0050 / Air Traffic Control - / 1,795.253 - / 27.428 - / 24.213 - / 11.044 - / - - / 11.044 P-40 Total Gross/Weapon System Cost - / 1,795.253 - / 27.428 - / 24.213 - / 11.044 - / - - / 11.044 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding supports Tactical Airspace Integration System (TAIS) software production and deployment, DoD Advanced Automation System (DAAS) Pre-Planned Product Improvement (P3I) upgrade, and Digital Airport Surveillance Radar (DASR) Pre-Planned Product Improvement (P3I) upgrades. FY 2026 to FY 2027 funding decrease is due to Army reprioritization of funding. The ATC portfolio of products ensures the Army meets DODD 5030.19 requirements as well as FAA and host nation airspace compliance agreements preventing loss of Army controlled airspace affecting airfields, heliports, and restricted areas impacting training and readiness. These systems prevent degradation of operations and safety of flight for both military and civil air traffic. In accordance with section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110 - 181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 6818AA0050 - Air Traffic Control Army UNCLASSIFIED Page 3 of 5 P-1 Line #32 Volume 1 - 230 === page 267 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6818AA0050 / Air Traffic Control Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: AA0050 / Air Traffic Control MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2027 Base FY 2027 OOC - FY 2026 - - - - 27.428 24.213 11.044 - 11.044 - Gross/Weapon System Cost ($ in Millions) 1,795.253 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) 1,795.253 Plus CY Advance Procurement ($ in Millions) - - - - - 27.428 24.213 11.044 - 11.044 - Total Obligation Authority ($ in Millions) 1,795.253 FY 2027 Total - - - - - 27.428 24.213 11.044 - 11.044 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) Flyaway Cost Recurring Cost Fixed Base Precision Approach Radar (FBPAR) - - 89.918 - - - - - - - - - - - - - - - DoD Advanced Automation System (DAAS) - - 144.280 - - 0.716 - - 2.120 - - 1.282 - - - - - 1.282 Digital Airport Surveillance Radar (DASR) - - 97.715 - - 0.076 - - 9.204 - - 3.998 - - - - - 3.998 Tactical Airspace Integration Sys (TAIS) - - 482.954 - - 0.785 - - 1.225 - - 1.249 - - - - - 1.249 Air Traffic Navigation and Integration - - 450.272 - - - - - - - - - - - - - - - Navigational Control (AAAS, DVOR, NVS, NVR) - - 10.744 - - - - - - - - - - - - - - - Army Airfield Automation System (AAAS) - - 34.956 - - 2.806 - - 5.399 - - 4.515 - - - - - 4.515 Doppler VHF Omnidirectional Range (DVOR) - - 5.082 - - - - - - - - - - - - - - - National Airspace System Voice Switch (NVS) - - 79.387 - - - - - - - - - - - - - - - LI 6818AA0050 - Air Traffic Control Army UNCLASSIFIED Page 4 of 5 P-1 Line #32 Volume 1 - 231 === page 268 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Army P-1 Line Item Number / Title: 6818AA0050 / Air Traffic Control Appropriation / Budget Activity / Budget Sub Activity: 2031A / 04 / 30 ID Code (A=Service Ready, B=Not Service Ready) : Item Number / Title [DODIC]: AA0050 / Air Traffic Control MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ K) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ K) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ K) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ K) Total Cost Qty (Each) ($ M) National Airspace System Voice Recorder (NVR) - - 5.213 - - 0.903 - - 1.169 - - - - - - - - - Tactical Terminal Control System (TTCS) - - 91.038 - - - - - - - - - - - - - - - Mobile Tower System (MOTS) - - 223.067 - - - - - - - - - - - - - - - ATC Common Simulator (ACS) - - 51.523 - - - - - - - - - - - - - - - Precision Approach Radar (PAR) 2020 - - 10.773 - - - - - - - - - - - - - - - Instrument Landing System (ILS) - - 18.331 - - 22.142 - - 5.096 - - - - - - - - - Subtotal: Recurring Cost - - 1,795.253 - - 27.428 - - 24.213 - - 11.044 - - - - - 11.044 Subtotal: Flyaway Cost - - 1,795.253 - - 27.428 - - 24.213 - - 11.044 - - - - - 11.044 Gross/Weapon System Cost - - 1,795.253 - - 27.428 - - 24.213 - - 11.044 - - - - - 11.044 Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 6818AA0050 - Air Traffic Control Army FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total - - - - - 27.428 24.213 11.044 - 11.044 - - - - - 27.428 24.213 11.044 - 11.044 UNCLASSIFIED Page 5 of 5 P-1 Line #32 Volume 1 - 232 === page 269 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 04: Support Equipment and Facilities / BSA 9154A50100 / Launcher, 2.75 Rocket 30: Other Support Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 106.435 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 106.435 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 106.435 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 3.815 1.611 3.864 - 3.864 1.621 1.620 1.620 1.637 - - - - - - - - - - - 3.815 1.611 3.864 - 3.864 1.621 1.620 1.620 1.637 - - - - - - - - - - - 3.815 1.611 3.864 - 3.864 1.621 1.620 1.620 1.637 - Total 122.223 122.223 122.223 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: The Aviation Rockets and Small Guided Munitions Product Office is the executive procurement agent for all services and Foreign Military customers for all variants of 2.75 Inch Hydra-70 Rocket Launchers. The M261 19-tube analog launcher and the M260 7-tube analog launcher are used to fire 2.75 Inch Hydra-70 Guided / Unguided Rockets from the following platforms: AH-64 Apache, H-60 Blackhawk, and Special Operations aircraft. The analog launchers are non-repairable, yet durable enough to withstand at least 16 rocket firings per tube before being discarded. The empty weight of the M260 analog launcher is approximately 35 pounds and the empty weight of the M261 analog launcher is approximately 82 pounds. The analog launcher permits fuze-timing selections from the cockpit and will launch guided / unguided rockets using either the MK40 or the MK66 motors. 2.75 Inch Rocket Launcher procurement funding supports the launcher system to include resolution of obsolescence, safety, reliability, weapon integration activities, test sets, engineering changes, and production issues. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 3.815 1.611 3.864 - 3.864 1.621 1.620 1.620 1.637 - - - - - - - - - 3.815 1.611 3.864 - 3.864 1.621 1.620 1.620 1.637 Justification: FY 2027 funding of $3.864 million procures 287 M261 launchers for the Army. FY 2026 to FY 2027 funding increase due to unit price growth of range pricing on the contract. LI 9154A50100 - Launcher, 2.75 Rocket Army UNCLASSIFIED Page 1 of 1 P-1 Line #33 Volume 1 - 233 === page 270 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Army P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 2031A: Aircraft Procurement, Army / BA 04: Support Equipment and Facilities / BSA 9157J01200 / Launcher Guided Missile: Longbow Hellfire XM299 30: Other Support Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - - 12.964 22.023 - - - - - - - - - 34.987 - - - - - - - - - - - - 12.964 22.023 - - - - - - - - - 34.987 - - - - - - - - - - - - 12.964 22.023 - - - - - - - - - 34.987 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) To FY 2031 Complete Total (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Thousands) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Thousands) - - - - - - - - - - - - Description: 9157J01200 / Launcher Guided Missile: Longbow Hellfire XM299 has no funding for FY 2027. The M299 launchers are qualified to carry and fire the AGM-114 Family of Missiles. Each launcher contains: Launcher electronics assembly (LEA) that communicates with the aircraft via bus commands, provides missile launch sequencing, seeker type ID, missile "Hang fire/Misfire" determination, alternate laser code algorithm processing, and AC to DC power conversion for supplying missile DC power; Wiring harnesses that provide electrical connection from LEA to missile rails (not interchangeable with M272 harnesses); Holdback latch that retains missiles on rails and Safe/Arm switch that mechanically interrupts the arm power going to the LEA. The weight of the M299 launcher (4-Rail Launcher) is approximately 114 pounds and the length of the M299 is approximately 66.3 inches. Secondary Distribution Army Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 22.023 - - - - - - - - - - - - - - - - - 22.023 - - - - - - - - Justification: 9157J01200 / Launcher Guided Missile: Longbow Hellfire XM299 has no funding for FY 2027. LI 9157J01200 - Launcher Guided Missile: Longbow Hellfir... Army UNCLASSIFIED Page 1 of 1 P-1 Line #34 Volume 1 - 234