=== page 1 === DEPARTMENT OF THE ARMY Fiscal Year 2027 BUDGET ESTIMATES April 2026 MILITARY CONSTRUCTION, ARMY RESERVE === page 2 === TABLE OF CONTENTS TAB DESCRIPTION --- ------------ 1. TABLE OF CONTENTS..................................... 2. STATE LIST............................................ 3. BUDGET APPENDIX EXTRACT............................... BUDGET SUMMARY...................................... APPROPRIATION LANGUAGE.............................. 4. SPECIAL PROGRAM CONSIDERATIONS........................ 5. INSIDE THE UNITED STATES.............................. Colorado............................................ Illinois............................................ Virginia............................................ 6. WORLDWIDE UNSPECIFIED................................. Design.............................................. Minor Construction.................................. PAGE NUMBER ----------- i v viii viii ix x 1 1 6 11 16 16 17 PAGE NO. i === page 3 === THIS PAGE INTENTIONALLY LEFT BLANK PAGE NO. ii === page 4 === FY 2027 Summary Discretionary and Mandatory Funding ($ in thousands) Table 1: Funding Overview FY 2025 ($K) Discretionary Military Construction, Army Reserve Mandatory Military Construction, Army Reserve Total FY 2026 ($K) FY 2027 ($K) $295,032 $107,239 $209,913 $0 $295,032 $0 $0 $209,913 $107,239 MANDATORY FUNDING JUSTIFICATION: The FY 2027 request for Army Reserve Military Construction includes $209,913 thousand of discretionary and no mandatory funding requested. The FY 2026 amount for Military Construction Army Reserve includes $107,239 thousand of discretionary and $0 of mandatory (reconciliation) for a total of $107,239 thousand. PAGE NO. iii === page 5 === THIS PAGE INTENTIONALLY LEFT BLANK PAGE NO. iv === page 6 === DEPARTMENT OF THE ARMY FISCAL YEAR 2027 MILITARY CONSTRUCTION, ARMY RESERVE (DOLLARS ARE IN THOUSANDS) INSIDE THE UNITED STATES STATE ----- PROJECT NUMBER ------- Colorado 96099 Illinois 93228 Virginia 90035 INSTALLATION/CITY (COMMAND) ----------------PROJECT TITLE ------------- AUTHORIZATION REQUEST ------------- NEW/ APPROPRIATION CURRENT REQUEST MISSION ------------- ------- PAGE ---- Fort Carson (USAR) 1 Equipment Concentration Site 92,000 92,000 ------------- ------------- Subtotal Fort Carson $ 92,000 92,000 * TOTAL MCAR FOR Colorado $ 92,000 92,000 38,000 38,000 ------------- ------------- C 1 C 6 C 11 Fort Sheridan (USAR) 6 Area Maintenance Support Activity Subtotal Fort Sheridan $ 38,000 38,000 * TOTAL MCAR FOR Illinois $ 38,000 38,000 48,000 48,000 ------------- ------------- Richmond (USAR) 11 Army Reserve Center Subtotal Richmond $ 48,000 48,000 * TOTAL MCAR FOR Virginia $ 48,000 48,000 $ 178,000 178,000 ** TOTAL INSIDE THE UNITED STATES FOR MCAR PAGE NO. v === page 7 === DEPARTMENT OF THE ARMY FISCAL YEAR 2027 MILITARY CONSTRUCTION, ARMY RESERVE (DOLLARS ARE IN THOUSANDS) WORLDWIDE STATE ----- PROJECT NUMBER ------- Worldwide Unspecified 98343 INSTALLATION/CITY (COMMAND) ----------------PROJECT TITLE ------------- AUTHORIZATION REQUEST ------------- NEW/ APPROPRIATION CURRENT REQUEST MISSION ------------- ------- Design (DESIGN) 16 Design Subtotal Design 0 10,413 ------------- ------------- 0 10,413 0 21,500 ------------- ------------- $ Minor Construction (MINOR) 96476 $ 0 21,500 * TOTAL MCAR FOR Worldwide Unspecified $ 0 31,913 ** TOTAL WORLDWIDE FOR MCAR $ 0 31,913 MILITARY CONSTRUCTION, ARMY RESERVE TOTAL $ 178,000 209,913 vi 16 17 Unspecified Minor Construction Subtotal Minor Construction PAGE NO. PAGE ---- Total Cost of New Mission Projects (0) $ 0 Total Cost of Current Mission projects (3) $ 178,000 Total Cost of other line items (2) $ 31,913 Total Cost of FY 2027 MCAR Projects (5) $ 209,913 17 === page 8 === THIS PAGE INTENTIONALLY LEFT BLANK PAGE NO. vii === page 9 === MILITARY CONSTRUCTION, ARMY RESERVE FISCAL YEAR 2027 BUDGET SUMMARY The military construction program for the Army Reserve shown in the schedules of this title is summarized in the following tabulation: FISCAL YEAR MILITARY CONSTRUCTION, ARMY RESERVE 2027 $209,913,000 1. Major Construction. The MCAR major construction program is one of the most visible means of improving Army Reserve facility working conditions. This program provides funding for military construction projects in the United States and Territories as authorized in the Military Construction Acts and in this year’s request for Authorization and Appropriations. This request funds the Army Reserve's most critical facility needs within the context of the Army's facility strategy. 2. Minor Construction. Provision is made for the construction of future unspecified projects that have not been individually authorized by law but are determined to be urgent requirements and do not cost more than the amounts specified in 10 U.S.C. 2805. Projects awarded with these funds must cost more than $4,000,000 and may not exceed $9,000,000. If located in the United States, or its territories, commonwealths, and possessions, the cost may be adjusted according to DoW published local construction cost index not to exceed $14,000,000. 3. Design. This provides for the necessary pre-award activities for military construction projects including surveys, studies, maintaining standards and criteria, design and cost estimates, and other related activities. In general, design funds requested in Fiscal Year 2027 will be used to design projects in the Army Reserve's Fiscal Years 2028, 2029, and 2030 programs. All new construction projects are designed to a minimum life of 40 years in accordance with DoW Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. PAGE NO. viii === page 10 === MILITARY CONSTRUCTION, ARMY RESERVE FISCAL YEAR 2027 BUDGET ESTIMATE APPROPRIATION LANGUAGE For acquisition, construction, expansion, rehabilitation, and conversion of facilities for the training and administration of the Army Reserve as authorized by Chapter 1803 of Title 10, United States Code and Military Construction Authorization Act, $209,913,000 to remain available until September 30, 2031: Provided, that, of such amount, not to exceed $10,413,000 shall be available for design, and architect and engineer services, as authorized by law, unless the Chief of the Army Reserve determines that additional obligations are necessary for such purposes and notifies the Committees on Appropriations of both Houses of Congress of the determination and the reasons therefore. PAGE NO. ix === page 11 === MILITARY CONSTRUCTION, ARMY RESERVE FISCAL YEAR 2027 BUDGET ESTIMATE SPECIAL PROGRAM CONSIDERATIONS Pollution Abatement Military construction projects proposed in this program will be designed to meet environmental standards. Projects proposed primarily for abatement of existing pollution problems have been reviewed to ensure that corrective design is accomplished in accordance with specific standards and criteria. This submission contains no projects specific to pollution abatement. Energy Conservation Military construction projects specifically for energy conservation have been developed, reviewed, and selected with prioritization by energy savings per investment cost. Any project proposed primarily for energy conservation includes improvements to existing facilities and utilities systems to upgrade design, eliminate waste, and install energy savings devices. Projects are designed for minimum energy consumption. Flood Plain Management and Wetlands Protection Proposed land acquisitions, disposals, and installation construction projects have been planned to allow for the proper management of flood plains and the protection of wetlands by avoiding long and short term adverse degradation of wetlands. Project planning is in accordance with the requirements of Executive Order Nos. 11988 and 11990. Design for Accessibility of Physically Handicapped Personnel In accordance with Public Law 90-480, provision for physically handicapped personnel will be provided for, where appropriate in the design of facilities included in this program. Environmental Protection In accordance with Section 102 (2) (c) of the National Environmental Policy Act of 1969 (PL 91-190), the environmental impact analysis process has been completed or is actively underway for all projects in the Military Construction Program. PAGE NO. x === page 12 === SPECIAL PROGRAM CONSIDERATIONS (Continued) Reserve Potential/Placement of Reserve Component Units in Local Communities The Reserve potential to meet and maintain authorized strengths of all Reserve flying/nonflying units in those areas in which these facilities are to be located has been reviewed. It has been determined, in coordination with all other Services having Reserve flying/nonflying units in these areas, that the number of units of the Reserve Components of the Armed forces presently located in those areas, and those which have been allocated to the areas for future activation, is not and will not be larger than the number that reasonably can be expected to be maintained at authorized strength considering the number of persons living in the areas who are qualified for membership in those Reserve units. Preservation of Historical Sites and Structures Facilities included in this program do not directly or indirectly affect a district, site, building, structure, object, or setting listed in the National Register of Historical Places, except as noted on DD Form 1391. Use of Excess Schools and Other Buildings Considerations were made to utilize available commercial or academic buildings but none were suitable except as identified by specific projects in this request. Congressionally Directed Projects No projects were directed by any Congressional committee for inclusion in the FY 2027 budget. Other Congressional – Design No considerations are made for directed design projects in the FY 2027 budget. PAGE NO. xi === page 13 === THIS PAGE INTENTIONALLY LEFT BLANK PAGE NO. xii === page 14 === 1. COMPONENT FY 2027 GUARD AND RESERVE AR 2. DATE MILITARY CONSTRUCTION 01 APR 2026 3. INSTALLATION AND LOCATION 4. AREA CONSTRUCTION Fort Carson COST INDEX Colorado 1.07 5. FREQUENCY AND TYPE OF UTILIZATION Reservist - 3 weekends/month Full-Time Personnel - 0 nights/week 5 days/week 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS Army Fort Carson, CO 0.00 miles Installation ARNG Colorado Springs, CO 4.25 miles Readiness Center ARNG Colorado Springs, CO 9.25 miles Readiness Center Space F Peterson SFB, CO 10.00 miles Installation Space F Schriever SFB, CO 14.00 miles Installation 7. PROJECTS REQUESTED IN THIS PROGRAM CATEGORY DESIGN STATUS COST CODE PROJECT TITLE 21418 Equip Concentration Site 4,982 m2 SCOPE ($000) START CMPL (53,624 SF) 92,000 MAR 2025 OCT 2026 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 12 FEB 2025 FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. 9. LAND ACQUISITION REQUIRED To be constructed on land master planned for the Army Reserve by Fort Carson. 0 (Number of acres) 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY CODE COST PROJECT TITLE SCOPE ($000) NONE DEFERRED SUSTAINMENT, RESTORATION, AND MODERNIZATION (SRM): 0 A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. 11. PERSONNEL STRENGTH AS OF 12 FEB 2026 PERMANENT DD GUARD/RESERVE TOTAL OFFICER ENLISTED CIVILIAN TOTAL OFFICER ENLISTED AUTHORIZED 60 9 37 14 930 208 722 ACTUAL 37 2 13 22 798 224 574 FORM MAY 78 1390s1 PREVIOUS EDITION MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 1 === page 15 === 1. COMPONENT FY 2027 GUARD AND RESERVE AR 2. DATE MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION 01 APR 2026 4. AREA CONSTRUCTION Fort Carson COST INDEX Colorado 1.07 12. RESERVE UNIT DATA AUTHORIZED 86% STRENGTH UNIT DESIGNATION AUTHORIZED ACTUAL Det 6 (Co F), 1st BN (BCT), 415th R 22 36 Detachment 3, USAR Element DISA 18 26 DET 2, 1st Space Brigade 34 43 87th Legal Operations DET, Team 4 4 5 87th Legal Operations DET, Team 11 4 3 22d Legal Operations DET, Team 5 5 4 22d Legal Operations DET, Team 16 3 3 Detachment 1, 3d Space Company 6 7 Detachment 2, 3d Space Company 6 9 Detachment 3, 3d Space Company 6 9 Detachment 4, 3d Space Company 6 4 Detachment 5, 3d Space Company 6 7 HHC, 3d Space Company 6 8 Detachment 1, 5th Space Company 6 8 Detachment 2, 5th Space Company 6 10 Detachment 3, 5th Space Company 6 13 Detachment 4, 5th Space Company 6 8 Detachment 5, 5th Space Company 6 12 HHC, 5th Space Company 6 8 Company A, 440th Civil Affairs BN 32 33 Company B, 440th Civil Affairs BN 32 25 Company C, 440th Civil Affairs BN 32 29 Company D, 440th Civil Affairs BN 32 24 HHC, 440th Civil Affairs BN 75 89 308th Military Police Company 123 77 UNITS NOT SHOWN 442 298 Totals 930 798 Total Units Not Shown = 11 ECS-42 supports 2,060 military vehicles and 2,000 items of equipment assigned to 83 Army Reserve units. 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE AUTHORIZED ACTUAL TRACKED 12 8 TRAILER 93 71 130 WHEELED 189 EQUIPMENT > 30 59 36 TOTALS 353 245 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) PAGE NO. 2 A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 PREVIOUS EDITION MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM MAY 78 1390s2 === page 16 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AR 01 APR 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Fort Carson Colorado Equipment Concentration Site 5. PROGRAM ELEMENT 6. CATEGORY CODE 0532292A 7. PROJECT NUMBER 8. PROJECT COST ($000) 92,000 92,000 Auth Approp 96099 21418 9. COST ESTIMATES ITEM UM (M/E) QUANTITY PRIMARY FACILITY 21418 Area Maintenance Support Activit m2 (SF) 44220 General Purpose Warehouse m2 (SF) 00000 Cybersecurity Measures EA Sustainability/Energy Measures LS 2,630 ( 2,352 ( 3 --- SUPPORTING FACILITIES Electric Service Water, Sewer, Gas Paving, Walks, Curbs And Gutters Storm Drainage Site Imp(22,594) Demo( ) Information Systems Other LS LS LS LS LS LS LS UNIT COST 28,307) 25,317) -------- COST($000) 9,268 9,268 264,000 -- 47,450 (24,373) (21,798) (792) (487) -------- 34,753 (1,110) (1,135) (6,049) (2,565) (22,594) (443) (857) ESTIMATED CONTRACT COST CONTINGENCY (5.00%) SUBTOTAL SUPV, INSP & OVERHEAD (6.50%) TOTAL REQUEST TOTAL REQUEST (ROUNDED) TOTAL RELATED FURNITURE & EQUIP 82,203 4,110 86,313 5,610 91,923 92,000 (2,281) 10. Description of Proposed Construction Construct an Equipment Concentration Site (ECS) on Fort Carson, CO. Primary facilities include an Area Maintenance Support Activity (AMSA) shop and General Purpose (GP) Warehouse. Facilities will be designed in accordance with the Army Reserve Design Guide. Supporting facilities include land clearing, general site improvements, organizational parking, non-organizational parking, concrete parking, concrete aprons, vehicle wash rack/platform, bi-level equipment loading ramp, fencing, walks, signage, curbs and gutters, storm drainage, SATS Trailer canopy, information systems, and utility connections. Supporting Facilities costs are higher than average due to special building foundations, extensive pavements, improved surfaces, site clearing, and excavation costs associated with developing the 48-acre parcel of land. Sustainability/Energy and cybersecurity measures are included. All fixtures, furnishings, and equipment will be provided. Antiterrorism force protection and physical security measures will be incorporated into the design including minimum standoff distances from roads, parking areas and vehicle unloading areas. Access for individuals with disabilities will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoW Unified Facilities Criteria 1-200-02 including energy efficiencies, building envelope and integrated building systems performance. Previously demolished buildings will meet the One-In-One-Out Guidance. 11. REQ: 2,630 m2 ADQT: NONE SUBSTD: 1,673 m2 PROJECT: Provide an AMSA shop and ECS GP Warehouse at Fort Carson. (Current Mission) REQUIREMENT: ECS-42 is located at Fort Carson, CO and supports the maintenance (AMSA) DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 3 === page 17 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AR 01 APR 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Fort Carson Colorado 5. PROGRAM ELEMENT Equipment Concentration Site 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) Auth 92,000 96099 Approp 92,000 0532292A 21418 REQUIREMENT: (CONTINUED) and storage of military vehicles (organizational parking) and unit equipment (GP warehouse) organic to Army Reserve units stationed within the region. The operational readiness of military equipment is essential for both training Army Reserve Soldiers and equipping units from which the Active component will draw upon for critical warfighting capabilities inherent to deployable combat forces. ECS-42 provides maintenance and storage support with civilian personnel to 83 Army Reserve units in the geographical area around Fort Carson. Supported units include engineer, military police, transportation, medical, ordinance, quartermaster, civil affairs, veterinarian, public affairs, and chaplain. The ECS stores 2,060 vehicles in the organizational parking area and 2,000 pieces of military equipment in the warehouse. The ECS mission requires facilities built to modern standards to conduct maintenance and repair on today's technologically advanced and specialized military equipment. This project combines maintenance, organizational parking, and equipment storage for all the Army Reserve units assigned to Fort Carson and the ECS onto one central site. Combining the requirements provides efficiencies and reduces future construction. This project meets 100 percent of the Army Reserve maintenance, MEP, and storage requirements on Fort Carson. This project will be constructed on land master planned for the Army Reserve by Fort Carson. CURRENT SITUATION: ECS-42 currently operates in Building 8930 on Fort Carson. Constructed in 1982, the facility no longer supports the maintenance requirements of the larger and more advanced equipment now in the Army's inventory. The aging facilities are in failing condition, crowded, and do not support the assigned mission as documented in the systems of record. Lacking work and inspection bays, the maintenance building is operating at a utilization three times the standard. To compensate for the work bay shortage, mechanics use three work areas located at the Colorado Springs Army Reserve Center (45-minute drive from Fort Carson). The vehicle exhaust system in the work bays is substandard and does not meet American Conference of Governmental Industrial Hygienists exhaust standards for working on turbo diesel engines. Work bay doors are too narrow for many Army vehicles resulting in mechanics working on equipment outside in the winter months. Organizational parking lots separated by twenty minutes driving time from Building 8930 directly impacts productivity. The primary organizational parking lot is located on the top of a landfill and acts as an asphalt landfill cap that restricts its use to only light vehicles such as Humvees, trailers, and tactical vehicles. Commercial access to the parking area is limited because low-boy trailers are unable to traverse the crest of the steep access drives. Upgrading and expanding the current facility is not cost effective and will not resolve all the operational impacts. Upon completion of the project Building 8930 will be returned to Fort Carson for disposal. IMPACT IF NOT PROVIDED: If this project is not provided, ECS-42 maintenance personnel at Fort Carson will continue to operate in maintenance facilities that are undersized and severely over-utilized. Scheduled maintenance will lapse, repair backlogs will grow, and Reserve units will be unable to access equipment for training, directly degrading readiness. Buildings and systems will continue to fail, and a disproportionate amount of maintenance dollars will be expended to keep the facilities operational. Overcrowded and poor working conditions will continue to have a negative impact on the quality of life, morale, and overall readiness of the force. ADDITIONAL: Required assessments have been made for supporting facilities and the project is not in a 100-year floodplain in-accordance-with Executive Order 11988. This project has been coordinated with the installation physical security plan, and all PAGE NO. 4 PREVIOUS EDITION IS OBSOLETE DD FORM 1391C, JUL 1999 === page 18 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AR 01 APR 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Fort Carson Colorado 5. PROGRAM ELEMENT Equipment Concentration Site 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) Auth 92,000 96099 Approp 92,000 0532292A 21418 ADDITIONAL: (CONTINUED) physical security measures are included. All required antiterrorism protection measures are included. Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. The Deputy Assistant Secretary of the Army (Installations, Housing and Partnerships) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. A parametric cost estimate based upon project engineering design was used to develop this budget estimate. Sustainable principles, to include life cycle cost effective practices, will be integrated into the design, development and construction of the project and will follow the guidance detailed in the Army Sustainable Design and Development Policy - complying with applicable laws and executive orders. 12. SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-bid-build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis performed: (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: MAR/2025 35% 65% OCT/2026 4,150 YES NO MAR/2027 APR/2027 APR/2030 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Nomenclature Appropriation Or Requested Cost ($000) Future Request Future Request Future Request Future Request Future Request 1,000 750 50 164 317 Collateral Equipment Furniture IDS Info Sys - ISC Info Sys - PROP Component POC: DD FORM 1391C, JUL 1999 Army Reserve OMAR OMAR OPA OPA OMAR Phone Number: 703-806-6729 PREVIOUS EDITION IS OBSOLETE PAGE NO. 5 === page 19 === 1. COMPONENT FY 2027 GUARD AND RESERVE AR 2. DATE MILITARY CONSTRUCTION 01 APR 2026 3. INSTALLATION AND LOCATION 4. AREA CONSTRUCTION Fort Sheridan COST INDEX Illinois 1.23 5. FREQUENCY AND TYPE OF UTILIZATION Reservist - 0 weekends/month Full-Time Personnel - 0 nights/week 5 days/week 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS USAR Lake Forest, IL NAVY Great Lakes, IL 1.00 miles Center 7.00 miles Station ARNG Waukegan, IL 12.00 miles Readiness Center USAR Arlington Heights, I 14.00 miles Center 7. PROJECTS REQUESTED IN THIS PROGRAM CATEGORY DESIGN STATUS COST CODE PROJECT TITLE 21418 Area Maint Sprt Activity 1,765 m2 SCOPE ($000) START CMPL (19,000 SF) 38,000 SEP 2022 OCT 2026 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 03 MAY 2024 FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. 9. LAND ACQUISITION REQUIRED To be constructed on land owned by the Army Reserve at the Philip H. Sheridan 0 Armed Forces Reserve Center. (Number of acres) 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY CODE COST PROJECT TITLE SCOPE ($000) NONE DEFERRED SUSTAINMENT, RESTORATION, AND MODERNIZATION (SRM): 0 A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. 11. PERSONNEL STRENGTH AS OF 12 FEB 2026 PERMANENT GUARD/RESERVE TOTAL OFFICER ENLISTED CIVILIAN TOTAL OFFICER ENLISTED AUTHORIZED 20 0 0 20 0 0 0 ACTUAL 20 0 0 20 0 0 0 12. RESERVE UNIT DATA AUTHORIZED STRENGTH UNIT DESIGNATION AUTHORIZED NONE AMSA-138 supports 615 vehicles. PAGE NO. 6 PREVIOUS EDITION MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM MAY 78 1390s1 ACTUAL === page 20 === 1. COMPONENT FY 2027 GUARD AND RESERVE AR 2. DATE MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION 01 APR 2026 4. AREA CONSTRUCTION Fort Sheridan COST INDEX Illinois 1.23 13. MAJOR EQUIPMENT AND AIRCRAFT AUTHORIZED ACTUAL WHEELED TYPE 595 595 TRACKED 20 20 TOTALS 615 615 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) DD A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 FORM MAY 78 1390s2 PREVIOUS EDITION MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 7 === page 21 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AR 01 APR 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Fort Sheridan Illinois Area Maintenance Support Activity 5. PROGRAM ELEMENT 6. CATEGORY CODE 0532292A 7. PROJECT NUMBER 8. PROJECT COST ($000) 38,000 38,000 Auth Approp 93228 21418 9. COST ESTIMATES ITEM UM (M/E) QUANTITY PRIMARY FACILITY 21418 Area Maintenance Support Activit m2 (SF) 93310 Building Demolition m2 (SF) 00000 Cybersecurity Measures EA Sustainability/Energy Measures LS 1,765 ( 2,494 ( 2 --- SUPPORTING FACILITIES Electric Service Water, Sewer, Gas Paving, Walks, Curbs And Gutters Storm Drainage Site Imp(3,333) Demo( ) Information Systems Other LS LS LS LS LS LS LS UNIT COST 19,000) 26,845) -------- COST($000) 11,910 501.06 250,000 -- 23,194 (21,024) (1,250) (500) (420) -------- 10,852 (2,150) (888) (2,437) (1,131) (3,333) (96) (817) ESTIMATED CONTRACT COST CONTINGENCY (5.00%) SUBTOTAL SUPV, INSP & OVERHEAD (6.50%) TOTAL REQUEST TOTAL REQUEST (ROUNDED) TOTAL RELATED FURNITURE & EQUIP 34,046 1,702 35,748 2,324 38,072 38,000 (839) 10. Description of Proposed Construction Construct an Area Maintenance Support Activity (AMSA) at the Philip H. Sheridan Armed Forces Reserve Center (AFRC), Fort Sheridan, IL. The primary facility is an AMSA shop. Facilities will be designed in accordance with the Army Reserve Design Guide. Supporting facilities include land clearing, general site improvements, organizational parking, concrete aprons, vehicle wash rack/platform, bilevel equipment loading ramp, fencing, walks, signage, curbs and gutters, storm drainage, building demolition, information systems, and utility connections. The supporting facilities costs for this project are higher than normal due to additional organizational parking provided for the collocated AFRC, utility infrastructure and connection requirements, and site improvement costs. Sustainability/Energy and cybersecurity measures are included. All fixtures, furnishings, and equipment will be provided. Antiterrorism force protection and physical security measures will be incorporated into the design including minimum standoff distances from roads, parking areas and vehicle unloading areas. Access for individuals with disabilities will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoW Unified Facilities Criteria 1-200-02 including energy efficiencies, building envelope and integrated building systems performance. Previously demolished buildings will meet the One-In-One-Out Guidance. Dispose/Demolish 1 building at Philip H. Sheridan Reserve Center, IL (Total 2,494 m2/26,845 SF). 11. REQ: 1,765 m2 PROJECT: Provide an AMSA shop at the Philip H. Sheridan AFRC. PAGE NO. 8 ADQT: NONE PREVIOUS EDITION IS OBSOLETE SUBSTD: 2,494 m2 (Current Mission) DD FORM 1391, JUL 1999 === page 22 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AR 01 APR 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Fort Sheridan Illinois 5. PROGRAM ELEMENT 0532292A PROJECT: (CONTINUED) Area Maintenance Support Activity 6. CATEGORY CODE 21418 7. PROJECT NUMBER 93228 8. PROJECT COST ($000) Auth Approp 38,000 38,000 REQUIREMENT: AMSA-138 is located at Fort Sheridan, IL and supports the maintenance of organic military vehicles assigned to Army Reserve units stationed within the region. The project's approved facility requirements are based on the 88th Readiness Division Real Property Master Plan. The operational readiness of military equipment is essential for both training Army Reserve Soldiers and equipping units from which the Active component will draw upon for critical warfighting capabilities inherent to deployable combat forces. AMSA-138 provides maintenance support with civilian personnel to 615 wheeled and track military vehicles. Services provided by AMSA-138 include preventive maintenance, non-scheduled repairs, and annual services. Units supported by the AMSA include transportation, cyber security, medical, military intelligence, veterinarian, and quartermaster. The AMSA mission requires facilities built to modern standards to conduct maintenance and repair on today's technologically advanced and specialized military equipment. This project will be constructed on land owned by the Army Reserve at the Philip H. Sheridan AFRC. CURRENT SITUATION: AMSA-138 currently operates in a facility on Fort Sheridan that was constructed in 1939. Although the facility's last major upgrade occurred in the 1950s, it no longer supports the maintenance requirements of the larger and more sophisticated equipment now in the Army's inventory. The aging facility is in failing condition, crowded, and does not support the assigned mission as documented in the systems of record. Wide-ranging facility deficiencies impede the throughput of equipment, creating scheduling delays and hindering productivity. AMSA-138 is lacking the required number of work and inspection bays necessary for the number of civilian personnel assigned, impacting maintenance productivity. The major building systems do not comply with current building codes, regulations, and life-safety standards. Building systems regularly break down causing production delays. Low repair bay ceiling heights and no overhead crane create time-consuming workarounds for performing maintenance operations. Upgrading and expanding the current facility is not cost effective and will not resolve all the operational impacts. Prior to construction the existing AMSA building 137 will be demolished. IMPACT IF NOT PROVIDED: If this project is not provided, AMSA-138 maintenance personnel at Fort Sheridan will continue to operate in maintenance facilities that are undersized and severely over-utilized. Scheduled maintenance will lapse, repair backlogs will grow, and Reserve units will be unable to access equipment for training, directly degrading readiness. Buildings and systems will continue to fail, and a disproportionate amount of maintenance dollars will be expended to keep the facilities operational. Overcrowded and poor working conditions will continue to have a negative impact on the quality of life, morale, and overall readiness of the force. ADDITIONAL: Required assessments have been made for supporting facilities and the project is not in a 100-year floodplain in-accordance-with Executive Order 11988. This project has been coordinated with the installation physical security plan, and all physical security measures are included. All required antiterrorism protection measures are included. Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. The Deputy Assistant Secretary of the Army (Installations, Housing and Partnerships) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. A parametric cost estimate based upon project engineering design was used to develop this budget estimate. Sustainable DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 9 === page 23 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AR 01 APR 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Fort Sheridan Illinois 5. PROGRAM ELEMENT Area Maintenance Support Activity 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) Auth 38,000 93228 Approp 38,000 0532292A 21418 ADDITIONAL: (CONTINUED) principles, to include life cycle cost effective practices, will be integrated into the design, development and construction of the project and will follow the guidance detailed in the Army Sustainable Design and Development Policy - complying with applicable laws and executive orders. 12. SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-bid-build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis performed: (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: SEP/2022 35% 50% OCT/2026 4,300 YES NO MAR/2027 APR/2027 APR/2029 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Nomenclature Appropriation Or Requested Cost ($000) Future Request Future Request Future Request Future Request 500 250 57 32 Furniture Collateral Equipment Info Sys - ISC Info Sys - PROP Component POC: PAGE NO. 10 Army Reserve OMAR OMAR OPA OMAR Phone Number: 703-806-6729 PREVIOUS EDITION IS OBSOLETE DD FORM 1391C, JUL 1999 === page 24 === 1. COMPONENT FY 2027 GUARD AND RESERVE AR 2. DATE MILITARY CONSTRUCTION 01 APR 2026 3. INSTALLATION AND LOCATION 4. AREA CONSTRUCTION Richmond COST INDEX Virginia .89 5. FREQUENCY AND TYPE OF UTILIZATION Reservist - 3 weekends/month Full-Time Personnel - 0 nights/week 5 days/week 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS ARNG Richmond, VA ARNG Sandston, VA 6.50 miles VA ARNG HQ 8.92 miles Readiness Center ARNG Richmond, VA 10.22 miles Readiness Center 7. PROJECTS REQUESTED IN THIS PROGRAM CATEGORY DESIGN STATUS COST CODE PROJECT TITLE 17140 Army Reserve Center 5,379 m2 SCOPE ($000) START CMPL (57,895 SF) 48,000 MAY 2024 OCT 2026 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 14 AUG 2025 FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. 9. LAND ACQUISITION REQUIRED To be constructed on land permitted to the Army Reserve by Defense Logistics Agency, Defense Supply Center Richmond. 0 (Number of acres) 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY CODE COST PROJECT TITLE SCOPE ($000) NONE DEFERRED SUSTAINMENT, RESTORATION, AND MODERNIZATION (SRM): 0 A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. 11. PERSONNEL STRENGTH AS OF 12 FEB 2026 PERMANENT GUARD/RESERVE TOTAL OFFICER ENLISTED CIVILIAN TOTAL OFFICER ENLISTED AUTHORIZED 99 21 33 45 239 82 157 ACTUAL 91 17 30 44 244 84 160 12. RESERVE UNIT DATA AUTHORIZED 102% STRENGTH UNIT DESIGNATION DD AUTHORIZED ACTUAL 343rd Ground Ambulance Company 66 71 390th Finance Company 27 27 80th Training Command 146 146 Totals 239 244 FORM MAY 78 1390s1 PREVIOUS EDITION MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 11 === page 25 === 1. COMPONENT FY 2027 GUARD AND RESERVE AR 2. DATE MILITARY CONSTRUCTION 01 APR 2026 3. INSTALLATION AND LOCATION 4. AREA CONSTRUCTION Richmond COST INDEX Virginia .89 13. MAJOR EQUIPMENT AND AIRCRAFT AUTHORIZED ACTUAL TRAILER TYPE 19 12 WHEELED 34 21 TOTALS 53 33 * Not all authorized vehicles assigned permanent parking at this facility: remaining vehicles are assigned permanent parking at an Army Reserve Equipment Concentration Site. 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) PAGE NO. 12 A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 PREVIOUS EDITION MAY BE USED INTERNALLY UNTIL EXHAUSTED DD FORM MAY 78 1390s2 === page 26 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AR 01 APR 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Richmond Virginia Army Reserve Center 5. PROGRAM ELEMENT 6. CATEGORY CODE 0532292A 7. PROJECT NUMBER 8. PROJECT COST ($000) 48,000 48,000 Auth Approp 90035 17140 9. COST ESTIMATES ITEM UM (M/E) QUANTITY PRIMARY FACILITY 17140 Army Reserve Center Building 44224 Unheated Organizational Storage 00000 Cybersecurity Measures Sustainability/Energy Measures m2 (SF) m2 (SF) EA LS 5,266 ( 113.06 ( 2 --- SUPPORTING FACILITIES Electric Service Water, Sewer, Gas Paving, Walks, Curbs And Gutters Storm Drainage Site Imp(2,000) Demo( ) Information Systems Antiterrorism Measures LS LS LS LS LS LS LS UNIT COST 56,678) 1,217) -------- COST($000) 6,743 2,677 261,000 -- 37,038 (35,503) (303) (522) (710) -------- 6,090 (750) (961) (873) (1,222) (2,000) (203) (81) ESTIMATED CONTRACT COST CONTINGENCY (5.00%) SUBTOTAL SUPV, INSP & OVERHEAD (6.50%) TOTAL REQUEST TOTAL REQUEST (ROUNDED) TOTAL RELATED FURNITURE & EQUIP 43,128 2,156 45,284 2,943 48,227 48,000 (2,099) 10. Description of Proposed Construction Construct a 300-member Army Reserve Center (ARC) at Defense Supply Center, Richmond, VA. Primary facilities include an Army Reserve Center and Unheated Storage Building. Facilities will be designed in accordance with the Army Reserve Design Guide. Supporting facilities include land clearing, general site improvements, lighting, walks, signage, curbs and gutters, storm drainage, paving, information systems, and utility connections. Sustainability/Energy and cybersecurity measures are included. All fixtures, furnishings, and equipment will be provided. Antiterrorism force protection and physical security measures will be incorporated into the design including minimum standoff distances from roads, parking areas and vehicle unloading areas. Access for individuals with disabilities will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoW Unified Facilities Criteria 1-200-02 including energy efficiencies, building envelope and integrated building systems performance. Previously demolished buildings will meet the One-In-OneOut Guidance. 11. REQ: 5,266 m2 ADQT: NONE SUBSTD: 6,842 m2 PROJECT: Provide a 300-member ARC at Defense Supply Center Richmond. (Current Mission) REQUIREMENT: The new ARC will provide the necessary infrastructure to train and equip Army Reserve Soldiers and leaders from which the Active component will draw upon for critical warfighting capabilities inherent to deployable combat forces. The ARC will support three Army Reserve units including a Ground Ambulance Company that provides ground evacuation within theater of operations and is designated as theater available in DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 13 === page 27 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AR 01 APR 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Richmond Virginia 5. PROGRAM ELEMENT Army Reserve Center 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) Auth 48,000 90035 Approp 48,000 0532292A 17140 REQUIREMENT: (CONTINUED) the Global Force Pool. A Finance Company currently assigned to Fort Lee is short on necessary facility space to train for its mission. The Army Reserve is consolidating the Training Command Headquarters in Charlotte, NC into the Training Command Headquarters in Richmond, VA. The new organizational structure will provide command and control over all Individual and Collective Training units across the Army Reserve. The ARC will allow the Two-star General Officer Command to conduct cohesive operations in the same facility. A modern training facility will increase readiness and sustainability in the long term for all units assigned. This project directly supports the Army Structure Memorandum 20282032 and is supported by the 2012 Richmond Metroplex allowing the consolidation of various units and providing economies of scale through the shared use of duplicate functional areas currently provided in four separate facilities. This project will be constructed on land permitted to the Army Reserve by Defense Logistics Agency, Defense Supply Center Richmond. CURRENT SITUATION: Richmond area Army Reserve units are currently assigned to two Army Reserve Centers and an Armed Forces Reserve Center. The 1LT Jimmie L. Monteith ARC was constructed in 1960 and is in failing condition and rated non-functional due to the lack of space and dated configuration. The COL Ernest H. Dervishian ARC was constructed in 1975 and is crowded and in failing condition. A shortage in space at the COL Ernest H. Dervishian ARC requires that a portion of the Training Command Headquarters in Richmond split-station into the AFRC. Neither ARC can be expanded due to site constraints. The intent is to dispose of both ARCs upon project completion. The Richmond AFRC was constructed in 1989 on U.S. Navy property and provides adequate capability for currently assigned Army Reserve units. The AFRC has capacity to house two additional Army Reserve units that are currently assigned to the above-mentioned ARCs which reduces the construction requirement for this project. The General Leonard T. Gerow ARC is experiencing an increase in assigned unit strength that requires a rebalancing of forces at Fort Lee, VA. The One-Star Training Division assigned to General Leonard T. Gerow ARC will increase significantly in full-time staff and weaponry to augment their capabilities. The relocation of the Finance Company to the new ARC at Defense Supply Center Richmond will allow the units remaining at Fort Lee to rebalance and ensure unit readiness. IMPACT IF NOT PROVIDED: If this project is not provided, the assigned units will be forced to operate and train in overcrowded and failing facilities. This will continue to have a negative impact on unit training, readiness, and Soldier retention. The ambulance unit will continue to travel through highly populated residential areas to conduct vehicle and equipment training. A two-star level training command will continue split operations between two locations due to the lack of space. Major repair projects will need to be conducted soon to improve the quality of the ARCs. ADDITIONAL: Required assessments have been made for supporting facilities and the project is not in a 100-year floodplain in-accordance-with Executive Order 11988. This project has been coordinated with the installation physical security plan, and all physical security measures are included. All required antiterrorism protection measures are included. An economic analysis has been prepared and utilized in evaluating this project. This project is the most cost-effective method to satisfy the requirement. The Deputy Assistant Secretary of the Army (Installations, Housing and Partnerships) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. A parametric cost estimate based upon PAGE NO. 14 PREVIOUS EDITION IS OBSOLETE DD FORM 1391C, JUL 1999 === page 28 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AR 01 APR 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Richmond Virginia 5. PROGRAM ELEMENT Army Reserve Center 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) Auth 48,000 90035 Approp 48,000 0532292A 17140 ADDITIONAL: (CONTINUED) project engineering design was used to develop this budget estimate. Sustainable principles, to include life cycle cost effective practices, will be integrated into the design, development and construction of the project and will follow the guidance detailed in the Army Sustainable Design and Development Policy - complying with applicable laws and executive orders. 12. SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-bid-build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis performed: (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: MAY/2024 35% 65% OCT/2026 5,710 YES NO MAR/2027 APR/2027 APR/2029 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Nomenclature Appropriation Or Requested Cost ($000) Future Request Future Request Future Request Future Request Future Request 1,350 150 50 490 59 Furniture Collateral Equipment IDS Info Sys - ISC Info Sys - PROP Component POC: DD FORM 1391C, JUL 1999 Army Reserve OMAR OMAR OPA OPA OMAR Phone Number: 703-806-6729 PREVIOUS EDITION IS OBSOLETE PAGE NO. 15 === page 29 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AR 01 APR 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Design Worldwide Various Design 5. PROGRAM ELEMENT 6. CATEGORY CODE 0532292A 7. PROJECT NUMBER 8. PROJECT COST ($000) 98343 96100 10,413 Approp 9. COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY 96100 Design QUANTITY LS -- UNIT COST -- COST($000) 10,413 (10,413) SUPPORTING FACILITIES 10,413 0 10,413 0 10,413 10,413 (0) 10. Description of Proposed Construction This item provides for: parametric, concept, and final design of major and unspecified minor construction projects; value engineering; and the development of standards and criteria for Army Reserve facilities. Facilities will be designed to a minimum life of 40 years in accordance with DoW Unified Facilities Criteria 1-200-02 including energy efficiencies, building envelope and integrated building systems performance. ESTIMATED CONTRACT COST CONTINGENCY (0.00%) SUBTOTAL SUPV, INSP & OVERHEAD (.00%) TOTAL REQUEST TOTAL REQUEST (ROUNDED) TOTAL RELATED FURNITURE & EQUIP 11. REQ: NONE ADQT: NONE SUBSTD: NONE PROJECT: Design funds. REQUIREMENT: This funding is required to provide design and engineering services for regular Military Construction, Army Reserve (MCAR) and Unspecified Minor projects. This account is dissimilar to any other line item in the MCAR budget in that it is reflective of an operations expense, versus a defined scope of a single construction project. Funds will be used by the United States Army Corps of Engineers districts for in-house designs, Architect-Engineer contracts, and administrative support functions. These funds are required for accomplishment of final correction, review, reproduction and advertisement of projects in the fiscal year 2027 program: for advancement to final design of projects in fiscal year 2028 and for initiation of design of projects in fiscal years 2029 and 2030. The funds request for the annual design requirement includes value engineering, the costs to update standards and criteria, guide specifications, technical manuals, and the cost to continue the Department of the Army Facility Standardization Program. PAGE NO. 16 PREVIOUS EDITION IS OBSOLETE DD FORM 1391, JUL 1999 === page 30 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA AR 01 APR 2026 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Minor Construction Worldwide Various Unspecified Minor Construction 5. PROGRAM ELEMENT 6. CATEGORY CODE 0532292A 7. PROJECT NUMBER 8. PROJECT COST ($000) 96476 96200 21,500 Approp 9. COST ESTIMATES ITEM PRIMARY FACILITY 96200 Minor Construction Facilities UM (M/E) QUANTITY LS -- UNIT COST -- COST($000) 21,500 (21,500) SUPPORTING FACILITIES 21,500 0 21,500 0 21,500 21,500 (5,620) ESTIMATED CONTRACT COST CONTINGENCY (0.00%) SUBTOTAL SUPV, INSP & OVERHEAD (.00%) TOTAL REQUEST TOTAL REQUEST (ROUNDED) TOTAL RELATED FURNITURE & EQUIP Provision is made for future unspecified minor construction projects including construction, alteration, or conversion of permanent or temporary facilities as authorized under Title 10 United States Code § 2805. Projects awarded with these funds must cost more than $4,000,000 while not exceeding $9,000,000. If located in the United States, or its territories, commonwealths, and possessions, the cost may be adjusted according to the DoW published local construction cost index not to exceed $14,000,000. Facilities will be designed to a minimum life of 40 years in accordance with DoW Unified Facilities Criteria 1-200-02 including energy efficiencies, building envelope and integrated building systems performance. 10. Description of Proposed Construction 11. REQ: NONE ADQT: NONE SUBSTD: NONE PROJECT: Minor Military Construction, Army Reserve. REQUIREMENT: This line item is required to provide for unspecified projects for which the need cannot reasonably be foreseen nor justified in time to be included in this Military Construction, Army Reserve program. CURRENT SITUATION: These urgent projects address high command priorities such as critical mission requirements, environmental protection, and unforeseen conditions. These projects cannot wait until the next annual budget submission. IMPACT IF NOT PROVIDED: The Army Reserve will be unable to address urgent and unforeseen requirements that arise during the year. DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 17