=== page 1 === DEPARTMENT OF THE ARMY ARMY NATIONAL GUARD ),6&$/<($5 (FY) 207 %8'*(7(67,0$7( MILITARY CONSTRUCTION -867,),&$7,21'$7$68%0,77('72CONGRESS APRIL 2026 === page 2 === === page 3 === TABLE OF CONTENTS ARMY NATIONAL GUARD TAB DESCRIPTION --- ------------ PAGE NUMBER ----------- 1. TABLE OF CONTENTS..................................... 2. STATE LIST............................................ 3. MILCON FUNDING EXHIBIT................................ 4. APPROPRIATION LANGUAGE................................ 5. ARNG FYDP............................................. i iii vii xi xiii 6. FLORIDA............................................... IDAHO................................................. LOUISIANA............................................. MASSACHUSETTS......................................... NEW YORK.............................................. OKLAHOMA.............................................. WASHINGTON............................................ WEST VIRGINIA......................................... WORLDWIDE VARIOUS..................................... 1 9 15 23 29 35 41 47 55 The estimated cost of this report for the Department of War is approximately $8,678.80 for fiscal year 2026. This includes $594.27 in expenses and $8,084.53 in DoW Labor. PAGE NO. i === page 4 === THIS PAGE INTENTIONALLY LEFT BLANK PAGE NO. ii === page 5 === DEPARTMENT OF THE ARMY MILITARY CONSTRUCTION PROGRAM FY 2027 ARMY NATIONAL GUARD STATE ----- PROJECT NUMBER ------- Florida CITY/INSTALLATION ----------------PROJECT TITLE ------------- AUTHORIZATION REQUEST ------------- NEW/ APPROPRIATION CURRENT REQUEST MISSION ------------- ------- PAGE ---- Camp Blanding Maneuver Training Center 120342 Automated Multipurpose Training Range (MPTR) 28,000 28,000 Subtotal Camp Blanding Maneuver Training Center $ 28,000 28,000 * TOTAL MCNG FOR Florida $ 28,000 28,000 27,000 27,000 C 1 C 9 C 15 C 23 C 29 Camp Orchard Cantonment Area Idaho 160175 Louisiana 220161 Massachusetts 250148 Mission Training Complex (Small) Subtotal Camp Orchard Cantonment Area $ 27,000 27,000 * TOTAL MCNG FOR Idaho $ 27,000 27,000 23,000 23,000 Abbeville RC NATIONAL GUARD READINESS CENTER Subtotal Abbeville RC $ 23,000 23,000 * TOTAL MCNG FOR Louisiana $ 23,000 23,000 43,000 43,000 MTA Camp Edwards NATIONAL GUARD READINESS CENTER Subtotal MTA Camp Edwards $ 43,000 43,000 * TOTAL MCNG FOR Massachusetts $ 43,000 43,000 0 90,000 Colonie New York 360211 National Guard Readiness Center Subtotal Colonie $ 0 90,000 * TOTAL MCNG FOR New York $ 0 90,000 PAGE NO. iii === page 6 === DEPARTMENT OF THE ARMY MILITARY CONSTRUCTION PROGRAM FY 2027 ARMY NATIONAL GUARD STATE ----- PROJECT NUMBER ------- Oklahoma CITY/INSTALLATION ----------------PROJECT TITLE ------------- NEW/ APPROPRIATION CURRENT REQUEST MISSION ------------- ------- PAGE ---- 18,500 18,500 C 35 C 41 C 47 AUTHORIZATION REQUEST ------------- Tulsa 401302 Washington 531804 West Virginia 540071 Worldwide Various 990033 Aircraft Maintenance Bay Subtotal Tulsa $ 18,500 18,500 * TOTAL MCNG FOR Oklahoma $ 18,500 18,500 18,000 18,000 Yakima Training Center Dining Facility Subtotal Yakima Training Center $ 18,000 18,000 * TOTAL MCNG FOR Washington $ 18,000 18,000 NATIONAL GUARD READINESS CENTER ADDITION/ALTERATION 20,000 20,000 Martinsburg Readiness Center Subtotal Martinsburg Readiness Center $ 20,000 20,000 * TOTAL MCNG FOR West Virginia $ 20,000 20,000 0 71,909 0 71,909 0 19,500 Design Design Subtotal Design $ 57 Minor Construction 990022 Unspecified Minor Construction Subtotal Minor Construction $ 0 19,500 * TOTAL MCNG FOR Worldwide Various $ 0 91,409 $ 177,500 358,909 ** ARMY NATIONAL GUARD TOTAL 55 PAGE NO. iv === page 7 === DEPARTMENT OF THE ARMY MILITARY CONSTRUCTION PROGRAM FY 2027 ARMY NATIONAL GUARD STATE ----- PROJECT NUMBER ------- CITY/INSTALLATION ----------------PROJECT TITLE ------------- AUTHORIZATION REQUEST ------------- NEW/ APPROPRIATION CURRENT REQUEST MISSION ------------- ------- Total Cost of New Mission Projects (0) $ 0 Total Cost of Current Mission Projects (8) $ 267,500 Total Cost of other line items (2) $ 91,409 Total Cost of FY 2027 MCNG Projects (10) $ 358,909 PAGE ---- PAGE NO. v === page 8 === THIS PAGE INTENTIONALLY LEFT BLANK PAGE NO. vi === page 9 === DISCRETIONARY AND MANDITORY FUNDING EXHIBIT MILITARY CONSTRUCTION, ARMY NATIONAL GUARD PAGE NO. vii === page 10 === THIS PAGE INTENTIONALLY LEFT BLANK PAGE NO. viii === page 11 === PAGE NO. ix $0 $358,909 $0 $0 $419,489 $288,430 $358,909 $288,430 FY 2027 ($K) $419,489 FY 2026 ($K) The FY 2026 amount for Military Construction, Army National Guard includes $288,430 thousand of discretionary funding and no mandatory (reconciliation) funding for a total of $288,430 thousand. MANDATORY FUNDING JUSTIFICATION: The FY 2027 request for Army National Guard Military Construction includes $358,909 thousand of discretionary funding and no mandatory (reconciliation) funding for a total of $358,909 thousand. Discretionary Military Construction, Army National Guard Mandatory Military Construction, Army National Guard Total Table 1: Funding Overview FY 2025 ($K) FY 2027 Summary Discretionary and Mandatory Funding ($ in thousands) === page 12 === THIS PAGE INTENTIONALLY LEFT BLANK PAGE NO. x === page 13 === APPROPRIATION LANGUAGE MILITARY CONSTRUCTION, ARMY NATIONAL GUARD For construction, acquisition, expansion, rehabilitation, and conversion of facilities for the training and administration of the Army National Guard, and contiguous therefore, as authorized by Chapter 1803 of Title 10, United States Code, as amended, and Military Construction Authorization Acts $358,909,000 to remain available until 30 September 2031. Provided, that of the amount appropriated, not to exceed $71,909,000 shall be available for study, planning, design, and architect and engineer services, as authorized by law, unless the Director of the Army National Guard determines that additional obligations are necessary for such purposed and notifies the Committees on Appropriations of both Houses of Congress of the determination and the reasons therefor. PAGE NO. xi === page 14 === THIS PAGE INTENTIONALLY LEFT BLANK PAGE NO. xii === page 15 === ARNG FYDP MILITARY CONSTRUCTION, ARMY NATIONAL GUARD PAGE NO. xiii === page 16 === THIS PAGE INTENTIONALLY LEFT BLANK PAGE NO. xiv === page 17 === PAGE NO. xv IN LA MA NY OK OR OR PA VT WA WV WI ZZZ ZZZ 2027 2027 2027 2027 2027 2027 2027 2027 2027 2027 2027 2027 2027 Fort Indiantown Gap; RPSUID: 5015 NG Ethan Allen AFB MTA; RPSUID: 6455 Yakima Training Center; RPSUID:7984 Martinsburg Readiness Center; RPSUID: 194738 Black River Falls; RPSUID: 4056 Various Various Tulsa; RPSUID: 7637 Linn County Readiness Center; RPSUID: 170728 NAVWPNSYSTRAFAC BRDMAN: RPSUID: 1015 Camp Atterbury; RPSUID: 4230 Abbeville RC; RPSUID: 195002 Camp Edwards; RPSUID: 6313 Colonie; RPSUID: 195455 Unspecified Minor Construction Design Total FY 2027 Program Request National Guard Readiness Center National Guard Readiness Center Add/Alt Dining Facility National Guard/Reserve Center Building Addition Automated Multipurpose Machine Gun Range Automated Multipurpose Machine Gun Range Aircraft Maintenance Bay National Guard Readiness Center National Guard Readiness Center National Guard Readiness Center National Guard Readiness Center Automated Multipurpose Machine Gun Range State Town or Installation Project Title 2027 2027 2027 FL MTC Camp Blanding; Automated Multipurpose Training Range (formerly RPSUID: 6326 Scout RECCE Gunnery Complex) ID Camp Orchard Cantonment Mission Training Complex (Small) Area; RPSUID: 6649 2027 2027 Year 2027 2027 19,500 71,909 358,909 0 20,000 18,000 0 0 0 18,500 0 90,000 43,000 23,000 0 27,000 28,000 Budgeted Amount 25,941 17,747 217,563 20,000 19,500 0 23,000 16,500 13,000 0 25,000 0 0 22,275 10,600 0 24,000 FYDP PB25 Explanation (20,000) Project removed. Project was appropriated, but not authorized for FY26. (6,441) 54,162 141,346 500 Increased cost for rounding. 18,000 Project inserted. (23,000) Project removed. (16,500) Training program moved project 2027 to 2030. Cost increase. (13,000) Training program moved project 2027 to 2029. Cost increase. Project was authorized and appropriated for FY26. 90,000 Project inserted. Project was authorized but not appropriated for FY26. 18,500 Project inserted. (25,000) Project removed. 43,000 Project inserted. 725 Increased cost for rounding. (10,600) Training program moved project 2027 to 2029. Cost increase. 27,000 Training program project inserted. 4,000 Increased cost. Change from FY25 to FY27 Military Construction Army National Guard, Future Years Defense Program FY 2027- FY 2031 990022 990033 550180 540071 531804 500058 420519 410133 401302 410056 360211 250148 220161 180162 160175 Proj No 2027 120342 109735 109736 85554 95881 93761 90317 91326 92139 85580 92138 90307 86606 90208 85627 92651 106919 Pax No E315 E314 ERVC ERVC ERVC ERVC ERVC ERVC TFMS TFML MDEP === page 18 === PAGE NO. xvi FL GA KS KY MT NJ PA VA WA ZZZ ZZZ 2028 2028 2028 2028 2028 2028 2028 2028 2028 2028 Various Various 2028 Unspecified Minor Construction Design Total FY 2028 Program Request Fort Riley; RPSUID: 5044 National Guard Readiness Center FMS Jackson; RPSUID: National Guard Vehicle Maintenance Shop 194830 MTA Fort William Henry Collective Training, Unaccompanied Housing, Harrison; RPSUID: 6321 Open Bay Newark; RPSUID: 6414 National Guard Readiness Center Fort Indiantown Gap; National Guard Readiness Center RPSUID: 5015 Sandston RC & FMS 1; Aircraft Maintenance Hangar Addition RPSUID: 7162 Tumwater; RPSUID: 190215 National Guard Vehicle Maintenance Shop MTC Camp Blanding; National Guard Readiness Center RPSUID: 6326 Fort Gordon; RPSUID: 5006 National Guard/Reserve Center Building State Town or Installation Project Title 2028 2028 DE Cheswold; RPSUID: 193088 National Guard Readiness Center 2028 Year 2028 2028 0 19,709 261,209 35,000 31,000 29,000 27,000 0 27,000 18,500 33,000 20,000 21,000 Budgeted Amount 6,286 12,998 260,907 35,000 30,750 28,980 26,450 20,000 27,000 0 32,643 20,000 20,800 FYDP PB25 Explanation (6,286) 6,711 302 0 250 Cost increase to comply with rounding rules. 20 Cost increase to comply with rounding rules. 550 Cost increase to comply with rounding rules. (20,000) Project removed. 0 18,500 Project inserted. 357 Cost increase to comply with rounding rules. 0 200 Cost increase to comply with rounding rules. Change from FY25 to FY27 Military Construction Army National Guard, Future Years Defense Program FY 2027- FY 2031 990022 990033 530130 511020 340167 420625 300252 200152 210029 130125 120321 Proj No 2028 100083 88239 95878 93794 102768 104734 92084 92084 88237 88236 90218 Pax No E315 E314 ERVC ERVC ERVC ERVC ERVC ERVC ERVC ERVC ERVC MDEP === page 19 === PAGE NO. xvii ZZZ ZZZ Unspecified Minor Construction Design Total FY 2029 Program Request Aircraft Maintenance Hangar Addition 2029 2029 Sandston RC & FMS 1; RPSUID: 7162 Various Various VA 2029 2029 2029 2029 2029 2029 2029 2029 2029 2029 2029 State Town or Installation Project Title 2029 2029 2029 AZ Rita Road (Tucson); National Guard Vehicle Maintenance Shop RPSUID: 192669 CO Westminster; RPSUID: National Guard Readiness Center 195040 FL MTC Camp Blanding; Training Support Center RPSUID: 6326 GU GUARNG Barrigada National Guard Readiness Center Alteration Complex; RPSUID: 5305 ID Idaho Falls TS; RPSUID: National Guard Readiness Center 5525 IN Camp Atterbury; RPSUID: Automated Multipurpose Machine Gun Range 4230 IA Waterloo Armory FMS: National Guard Readiness Center Add/Alt RPSUID: 7800 ME Camp Keyes Training Site; Combined Support Maintenance Shop RPSUID: 4264 Ready Building MD Aberdeen Prvg Grd (Edgewood Enclave); RPSUID: 3702 MI Detroit Olympia; RPSUID: National Guard Readiness Center Add/Alt 4716 OR NAVWPNSYSTRAFAC Automated Multipurpose Machine Gun Range BRDMAN: RPSUID: 1015 Year 2029 2029 24,510 59,335 314,845 0 18,000 58,833 18,618 260,851 31,100 0 33,600 14,700 0 34,000 19,300 16,200 0 31,100 12,500 0 0 24,900 FYDP PB25 19,500 16,500 16,000 31,000 20,000 20,000 31,000 25,000 Budgeted Amount Explanation (34,323) 40,717 53,994 (31,100) Project removed. 18,000 Training program moved project 2027 to 2029. Cost increase. Project was authorized and appropriated for FY26. 400 Cost increase to comply with rounding rules. (14,700) Project removed. 200 Cost increase to comply with rounding rules. 300 Cost increase to comply with rounding rules. 16,000 Training program moved project 2027 to 2029. Cost increase. (100) Cost reduction to comply with rounding rules. 7,500 Cost increase. 20,000 Training program project insertion. 31,000 Project moved 2026 to 2029. Cost increase. 100 Cost increase to comply with rounding rules. Change from FY25 to FY27 Military Construction Army National Guard, Future Years Defense Program FY 2027- FY 2031 990022 990033 511019 410133 260282 240166 230043 190004 180162 160134 140062 120231 082416 Proj No 2029 040993 85548 92139 95791 95860 85436 92214 85627 92128 90745 92278 85563 92501 Pax No E315 E314 TFML ERVC ERVC ERVC TFML ERVC ERVC TFMS ERVC ERVC MDEP === page 20 === PAGE NO. xviii PA SD TN UT WY ZZZ ZZZ 2030 2030 2030 2030 2030 2030 2030 Unspecified Minor Construction Design Total FY 2030 Program Request 28,213 55,687 289,400 42,000 Collective Training, Unaccompanied Housing; Open-Bay 30,000 26,000 39,000 30,000 17,500 21,000 2030 Budgeted Amount National Guard Readiness Center Add/Alt National Guard Vehicle Maintenance Shop National Guard Vehicle Maintenance Shop Automated Multipurpose Machine Gun Range National Guard Vehicle Maintenance Shop OH 2030 Camp Perry Joint Training Center; RPSUID: 4280 Fort Indiantown Gap; RPSUID: 5015 Sturgis Armory; RPSUID: 7455 Lebanon; RPSUID: 5849 Manti Readiness Center; RPSUID: 190131 Camp Guernsey Joint Training Center; RPSUID: 6329 Various Various State Town or Installation Project Title 2030 2030 MS Carthage; RPSUID: 192861 National Guard Readiness Center Year 2030 2030 FYDP PB25 0 0 0 0 0 0 0 0 0 0 Explanation 28,213 55,687 289,400 42,000 Accelerated from Infrastruture Requirements Plan 17,500 Accelerated from Infrastruture Requirements Plan 21,000 Accelerated from Infrastruture Requirements Plan 30,000 Accelerated from Infrastruture Requirements Plan 26,000 Training program moved project 2027 to 2030. Cost increase. 39,000 Accelerated from Infrastruture Requirements Plan 30,000 Accelerated from Infrastruture Requirements Plan Change from FY25 to FY27 Military Construction Army National Guard, Future Years Defense Program FY 2027- FY 2031 990022 990033 562002 470329 491302 465045 420519 392003 Proj No 2030 280240 108695 108540 92141 108694 91326 109703 108102 Pax No E315 E314 E4H7 ERVC ERVC ERVC TFML ERVC ERVC MDEP === page 21 === PAGE NO. xiv Various Various 2031 Unspecified Minor Construction Design Total FY 2031 Program Request ZZZ ZZZ 2031 2031 2031 2031 2031 2031 2031 State Town or Installation Project Title 2031 2031 CO Pueblo West; RPSUID: National Guard Vehicle Maintenance Shop 194333 ID Ada County Readiness National Guard Readiness Center Center; RPSUID: 192953 LA Hammond Airport; RPSUID: National Guard Readiness Center 5336 National Guard Readiness Center NC Rocky Mount Fountain School Road North; RPSUID: 193231 OH Lima Readiness Center; National Guard Readiness Center RPSUID: 194675 TX Beaumont; RPSUID: 191230 National Guard Readiness Center Year 2031 2031 41,087 53,792 265,879 23,000 31,000 0 0 0 0 0 0 27,000 0 0 0 FYDP PB25 27,000 29,000 34,000 Budgeted Amount Explanation 41,087 53,792 265,879 23,000 Accelerated from Infrastruture Requirements Plan 31,000 Accelerated from Infrastruture Requirements Plan 27,000 Accelerated from Infrastruture Requirements Plan 27,000 Accelerated from Infrastruture Requirements Plan 29,000 Accelerated from Infrastruture Requirements Plan 34,000 Accelerated from Infrastruture Requirements Plan Change from FY25 to FY27 Military Construction Army National Guard, Future Years Defense Program FY 2027- FY 2031 990022 990033 481301 390130 371605 220315 160166 Proj No 2031 080310 Pax No E315 E314 ERVC ERVC ERVC ERVC ERVC ERVC MDEP === page 22 === THIS PAGE INTENTIONALLY LEFT BLANK PAGE NO. xx === page 23 === 1. COMPONENT FY 2027 GUARD AND RESERVE ARNG MILITARY CONSTRUCTION 2. DATE APRIL 2026 3. INSTALLATION AND LOCATION 4. AREA CONSTRUCTION Camp Blanding Maneuver Training Center; RPSUID: 6326 COST INDEX .86 Florida 5. FREQUENCY AND TYPE OF UTILIZATION Reservists: 7 nights/week Reservist Full-Time Personnel: 7 days/week. 1 Weekend/Month 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS ARNG Starke, FL 7.00 miles Readiness Cneter 0 (0 SF) 1967 ARNG Jacksonville-Cecil F 40.00 miles Aviation Facility 10,765 m2 (115,871 SF) 1987 ARNG Jacksonville-Syder, 45.00 miles Readiness Cneter 3,190 m2 (34,336 SF) 1973 7. PROJECTS REQUESTED IN THIS PROGRAM CATEGORY SCOPE Automated Multipurpose Training Range 17865 DESIGN STATUS COST PROJECT TITLE CODE 25 FP (25 FP) ($000) START CMPL 28,000 OCT 2024 OCT 2026 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 16 FEB 2023 FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. 9. LAND ACQUISITION REQUIRED NONE 0 (Number of acres) 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY CODE COST PROJECT TITLE SCOPE ($000) NONE A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. 11. PERSONNEL STRENGTH AS OF 22 SEP 2022 PERMANENT GUARD/RESERVE TOTAL OFFICER ENLISTED CIVILIAN TOTAL OFFICER ENLISTED AUTHORIZED 81 2 11 68 151 24 127 ACTUAL 81 2 11 68 151 24 127 UIC TPSN MTOE/TDA AUTHORIZED W7Q6AA 66755 NGW7Q6AA 151 151 151 151 12. RESERVE UNIT DATA STRENGTH UNIT DESIGNATION (ACT CAMP BLANDING TNG) ACTUAL Assigned/Authorized: 100% DD FORM MAY 78 1390s1 PREVIOUS EDITION MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 1 === page 24 === 1. COMPONENT FY 2027 GUARD AND RESERVE ARNG MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION 2. DATE APRIL 2026 4. AREA CONSTRUCTION Camp Blanding Maneuver Training Center; RPSUID: 6326 COST INDEX Florida .86 13. MAJOR EQUIPMENT AND AIRCRAFT AUTHORIZED ACTUAL WHEELED TYPE 26 26 TRAILERS 1 1 TRACKED 1 1 EQUIPMENT>30 FT 4 4 FUEL & M977 HEMTT 0 0 FUEL & M977 HEMTT 0 0 TOTALS 32 32 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) DD A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 FORM MAY 78 1390s2 PREVIOUS EDITION MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 2 === page 25 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Camp Blanding Maneuver Training Center; RPSUID: 6326 Florida Automated Multipurpose Training Range (MPTR) 5. PROGRAM ELEMENT 0505896A 6. CATEGORY CODE 7. PROJECT NUMBER 17865 8. PROJECT COST ($000) 120342 28,000 Approp 9. COST ESTIMATES ITEM PRIMARY FACILITY 17865 Automated Multipurp Tng Range 17897 Inf. Plt Battle Course Overlay 17971 Range Control Tower 17122 Range Ops & Strg 17122 Ammo Brkdwn Bldg Total from Continuation page(s) SUPPORTING FACILITIES Electric Service Water, Sewer, Gas Paving, Walks, Curbs And Gutters Site Imp(136) Demo( ) Information Systems Other UM (M/E) QUANTITY UNIT COST LS LS FA m2 (SF) m2 (SF) --578 -167.23 ( 16.72 ( --1,161 3,656 7,871 LS LS LS LS LS LS ------- 1,800) 180) ------- COST($000) 24,530 (13,230) (778) (671) (611) (132) (9,108) 1,407 (229) (36) (28) (136) (103) (875) ESTIMATED CONTRACT COST CONTINGENCY (5.00%) SUBTOTAL SUPV, INSP & OVERHEAD (3.00%) TOTAL REQUEST TOTAL FEDERAL REQUEST TOTAL FEDERAL REQUEST (ROUNDED) INSTALLED EQT-OTHER APPROP 25,937 1,297 27,234 817 28,051 28,051 28,000 (8,163) 10. Description of Proposed Construction A standard designed Multipurpose Training Range (MPTR) with an Infantry Platoon Battle Course (IPBC) overlay of permanent construction. The MPTR with the IPBC overlay range complex includes the following items that are integral to the facility: Range Control Tower, Range Operations and Storage, Ammunition Breakdown Building, Latrines (wet), Bleacher Enclosure, Covered Mess Shelter, Camera Towers, Range After Action Review (AAR) Building, Military equipment Parking, Bivouac Area, Moving Armored Target (MAT) Emplacements, Stationary Armored Target (SAT) Emplacements, Moving Infantry Target (MIT) Emplacements, Stationary Infantry Target (SIT) Emplacements, Hasty Battle Positions, Machine Gun Bunkers, Turret Down Battle Positions, Trench Complex, Urban Cluster, Facades, and Sustainability/Energy Measures. Comprehensive design services are requested. This facility will be designed to meet Industry Standards as well as all local, State, and Federal building codes and as per 42 U.S.C. 4154. Construction will include all utility services, information systems, fire detection and alarm systems, roads, walks, site improvements, and automated target systems to train and test teams and sections of armor on the skills necessary to detect, identify, engage and defeat stationary/moving infantry and stationary/moving armor targets in a tactica 1 array. Facilities will be designed to a minimum life of 50 years in accordance with DoW's Unified Facilities Code (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance as per ASA(IE&E) Sustainable Design and Development Policy updated 2017. Access for individuals with disabilities will be DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 3 === page 26 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Camp Blanding Maneuver Training Center; RPSUID: 6326 Florida Automated Multipurpose Training Range (MPTR) 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 0505896A 17865 9. COST ESTIMATES (CONTINUED) 8. PROJECT COST ($000) 120342 ITEM UM (M/E) PRIMARY FACILITY (CONTINUED) 73075 Latrine m2 (SF) 75061 Bleacher Enclosure m2 (SF) 17139 Mess shelter m2 (SF) 17123 Range AAR Building m2 (SF) 17804 Camera Tower (FLIR) EA 17804 Urban Cluster (7 Bldgs.) EA 17804 Range Marker-Outer Limit Rm-1 FP 17804 Range Marker-Interior Limit RM-2 FP 17804 SIT Empl -0.50 cal Berm EA 17804 MIT-15m- 0.50 cal Berm EA 17804 SAT Frontal - 0.50 cal Berm EA 17804 SAT Flank - 0.50 cal Berm EA 17804 MAT-350M -0.50 cal Berm EA 17804 Facade EA 17804 Trench Complex (2@300LF) m (LF) 17804 Rev Slope/Hasty Battle Position EA 17804 Turret-Down Battle Position EA 17804 Machine Gun Bunker EA Sustainability/Energy Measures LS Building Information Systems LS 28,000 Approp UNIT COST QUANTITY 51.10 ( 67.45 ( 74.32 ( 98.85 ( 2 -1 -12 -12 -137 -4 -24 -6 -6 -5 -182.88 ( 6 -4 -2 ---- 550) 726) 800) 1,064) 12,274 2,975 2,145 3,339 51,998 248,429 1,472 818.50 3,856 25,893 18,807 28,102 702,349 31,178 600) 3,520 74,025 139,285 35,490 --Total COST ($000) (627) (201) (159) (330) (104) (248) (18) (10) (528) (104) (451) (169) (4,214) (156) (644) (444) (557) (71) (32) (41) 9,108 DESCRIPTION OF PROPOSED CONSTRUCTION: (CONTINUED) provided. Antiterrorism measures in accordance with the DoW Minimum Antiterrorism for building standards will be provided. This project will comply with the Army 1 SQFT for 1 SQFT disposal policy through the disposal of 5,698 SQFT. Mission: Current A/C Tonnage: 20 Disposal of 1 building at Daytona Beach Armed Forces Reserve Center, FL (Total 186 m2/2,000 SF), and 5 buildings at Camp Blanding Maneuver Training Center, FL (Total 508 m2/5,469 SF). 11. REQ: 24 FP ADQT: NONE SUBSTD: NONE PROJECT: The project has been validated by ARNG-TR and approved to construct a Multipurpose Training Range (MPTR) with an Infantry Platoon Battle Course (IPBC) overlay that supports the training and testing requirements of the FLARNG. The MPTR complex supports dismounted infantry tactical live fire operations independently of, or simultaneously with supporting vehicles. A convoy live fire route can include the use of crossover roads. All targets are fully automated, with event specific target scenarios that are computer driven from the range control tower. When properly equipped and manned, this range can replicate a complex operational environment better enabling units to train multi-domain operations (MDO). Targets will receive and transmit digital data from the range control tower. The captured data are then compiled and available to the unit during the After Action Review (AAR). The IPBC overlay is designed for the training and DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 4 === page 27 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Camp Blanding Maneuver Training Center; RPSUID: 6326 Automated Multipurpose Training Range (MPTR) Florida 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) 0505896A 17865 120342 Approp 28,000 PROJECT: (CONTINUED) qualification requirements of infantry platoons, either mounted or dismounted, on movement techniques and operations. This course is used to train and test platoons on the skills necessary to conduct tactical movement techniques and to detect, identify, engage, and defeat stationary and moving armor and infantry targets in a tactical array. The range complex tests crews, teams, sections of armor, and infantry units on the skills necessary to detect, identify, engage, and defeat stationary and moving infantry and armor targets in a tactical array. The project has been validated by ARNG-TR and approved. This facility will be built on State land. (Current Mission) (Current Mission) REQUIREMENT: This facility is designed to meet Multipurpose Training Range (MPTR) with an Infantry Platoon Battle Course (IPBC) overlay skill requirements. Range will train and test crews, teams, sections of armor, and infantry units on the skills necessary to detect, identify, engage, and defeat stationary and moving infantry and armor targets in a tactical array collective tasks as outlined in TC 90-1. All targets are fully automated, and the event-specific target scenario will be computer driven and scored from the range operations center. There are currently no equivalent range in the FLARNG inventory to support the specific training mission. The Army Range Requirements Model (ARRM) listed units scheduling range: WQV8AA 53rd IBCT PAX 127 , WP5NAA 1-124th IN PAX 640, WPW2AA 2-124th IN PAX 640, WY22AA 1-153rd CAV PAX 355, WPWOAA 2-116th FA PAX 548, WPMWAA 753rd BEB PAX 430, WPWZAA 53rd SPT BN PAX 773, WQFYAA 146th SC BN PAX 450, WQV7AA 153rd FI PAX 23, WS9YAA 1153rd FI PAX 25, WPZSAA 2153rd FI PAX 25, WPZTAA 3153rd FI PAX 25, WPWYAA 914 QM PAX 62, WPXBAA 907th QM PAX 77 WQYEAA 631st MAINT PAX 146, WX6DAA 856th QM PAX 121, WP5BAA 356th QM PAX 121, WTUDAA 927th CSSB PAX 66, WYR3AA 260th MI PAX 234, WPKMAA 160th TC PAX 159, WQH2AA 144th TC PAX 156, WPYXAA 138th TC PAX 156, WP9FAA 1218th TC PAX 157, WP9HAA 254th TC PAX 46, WPQTAA 930th DLD PAX 30, WTVAAA 50th RSG PAX 79, WP8LAA 715th MP PAX 159, WX7AAA 3116th FSC PAX 124, WYKSAA 3-256th ADA PAX 381, WV47AA 3116th FA PAX 235, WYKVAA 1-256th ADA PAX 381, WP5VAA 164th ADA PAX 157, WPS6AA 3-54th SFAB CAV PAX 175, WPS0AA 2-54th SFAB IN PAX 175, WYDZAA 221st EOD PAX 33, WPJAAA 669th EN PAX 12, WYLUAA 269th EN PAX 10, WPJ8AA 868th EN PAX 153, WPJFAA 870th EN PAX 93, WPGCAA 1448th CHEM PAX 97, WPFQAA 448th CHEM PAX 68, WQREAA 2-lllth AV PAX 64, WX90B4 B/351st AV PAX 90, WP7SB0 2-151st AV PAX 51, 1-185th AV PAX 79, WYDGAA 1-lllth AV PAX 291, W788AA 83rd TC PAX 32, WTPEAA 3-20th SF PAX 432. This will save in annual training costs and time. CURRENT SITUATION: This project is critical to the state of Florida due to the current situation of no Multipurpose Training Range (MPTR) or Infantry Platoon Battle Course (IPBC) within 200 miles travel distance limit, specified in NGB/FORSCOM Regulation 350-2, that meet qualification standards making it difficult for units to be trained in combat arms operations. The project has been validated by ARNG-TR. The site for this project is in the possession of the State of Florida. Currently, the State of Florida has completed the environmental assessment on this project. There currently is no facility to complete the mission. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 5 === page 28 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Camp Blanding Maneuver Training Center; RPSUID: 6326 Florida Automated Multipurpose Training Range (MPTR) 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 0505896A 17865 CURRENT SITUATION: (CONTINUED) Site Site Cat FACNO Code UID Code 12A01 17865 120342 ISR-I Year F Rating 8. PROJECT COST ($000) 28,000 Approp Q Rating C Rating C4 Local Name NONE IMPACT IF NOT PROVIDED: If this project is not provided, it will be impossible for assigned units to acquire and maintain the proficiency required for combat units. This proficiency can only result from realistic training under simulated combat training. Traveling to an alternate facility will result in increased cost and loss of valuable collective training time normally reserved for annual training. Overall readiness will be degraded regardless of the alternative used. Safety concerns will continue to rise due to the amount of travel needed to train to standard and retention will decrease due to Soldiers not being able to train in their home installation. ADDITIONAL: Required assessments have been made for supporting facilities and the project is not in a 100-year floodplain in-accordance-with Executive Order 11988. This project has been coordinated with the installation physical security plan, and all physical security measures are included. All required antiterrorism protection measures are included. An economic analysis has been prepared and utilized in evaluating this project. This project is the best method to satisfy the requirement. The Deputy Assistant Secretary of the Army (Installations, Housing and Partnerships) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. 12. SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-bid-build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis performed: (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE OCT/2024 35% 65% OCT/2026 2,559 YES YES MAR/2027 MAY/2027 MAY/2029 PAGE NO. 6 === page 29 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Camp Blanding Maneuver Training Center; RPSUID: 6326 Automated Multipurpose Training Range (MPTR) Florida 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) 0505896A 17865 120342 Approp 28,000 12. SUPPLEMENTAL DATA (CONTINUED..) B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) FF&E IPBC Targets UXO MPTR Targets Info Sys - ISC Component POC: DD FORM 1391C, JUL 1999 OPA OPA OMNG OPA OPA 2028 2028 2025 2028 2028 80 2,784 3,175 2,085 39 ARNG MILCON Budget Officer PREVIOUS EDITION IS OBSOLETE PAGE NO. 7 === page 30 === THIS PAGE INTENTIONALLY LEFT BLANK PAGE NO. 8 === page 31 === 1. COMPONENT FY 2027 GUARD AND RESERVE ARNG MILITARY CONSTRUCTION 2. DATE APRIL 2026 3. INSTALLATION AND LOCATION 4. AREA CONSTRUCTION Camp Orchard Cantonment Area; RPSUID: 6649 COST INDEX 1.04 Idaho 5. FREQUENCY AND TYPE OF UTILIZATION Support logistical and operational activities for training 365 days/year. 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS ARNG Nampa, ID 17.00 miles Readiness Center 1,230 m2 (13,240 SF) 1957 ARNG Caldwell, ID 27.00 miles Readiness Center 1,944 m2 (20,928 SF) 1963 ARNG Edgemeade, ID 45.00 miles Readiness Center 494 m2 (5,320 SF) 1981 7. PROJECTS REQUESTED IN THIS PROGRAM PROJECT TITLE CATEGORY Complex (Small) 17213 DESIGN STATUS COST Mission Training CODE 4,279 m2 SCOPE ($000) START CMPL (46,060 SF) 27,000 DEC 2024 MAR 2026 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 22 MAR 2023 FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. 9. LAND ACQUISITION REQUIRED None 0 (Number of acres) 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY CODE COST PROJECT TITLE SCOPE ($000) NONE A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. 11. PERSONNEL STRENGTH AS OF 06 JUN 2025 PERMANENT GUARD/RESERVE TOTAL OFFICER ENLISTED CIVILIAN TOTAL OFFICER ENLISTED AUTHORIZED 13 2 11 0 138 23 115 ACTUAL 44 2 11 31 138 23 115 UIC TPSN 12. RESERVE UNIT DATA STRENGTH UNIT DESIGNATION (ACT INST SPT UNIT GOW) W7XEAA MTOE/TDA AUTHORIZED NGW7XEAA 138 ACTUAL 138 138 138 Assigned/Authorized: 100% 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE DD FORM MAY 78 AUTHORIZED ACTUAL WHEELED 71 71 TRAILERS 6 6 TRACKED 1 1 EQUIPMENT > 30 FT 6 6 Fuel Truck 1 1 HET 0 0 TOTALS 85 85 1390s1 PREVIOUS EDITION MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 9 === page 32 === 1. COMPONENT FY 2027 GUARD AND RESERVE ARNG MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION 2. DATE APRIL 2026 4. AREA CONSTRUCTION Camp Orchard Cantonment Area; RPSUID: 6649 COST INDEX 1.04 Idaho 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) DD A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 FORM MAY 78 1390s2 PREVIOUS EDITION MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 10 === page 33 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Camp Orchard Cantonment Area; Idaho 5. PROGRAM ELEMENT 0505896A RPSUID: 6649 Mission Training Complex (Small) 6. CATEGORY CODE 7. PROJECT NUMBER 17213 8. PROJECT COST ($000) 160175 27,000 Approp 9. COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY 17213 Mission Command Trng Center m2 (SF) Sustainability/Energy Measures LS SUPPORTING FACILITIES Electric Service Water, Sewer, Gas Paving, Walks, Curbs And Gutters Storm Drainage Site Imp(684) Demo( ) Information Systems Antiterrorism Measures Other QUANTITY 4,279 ( -- LS LS LS LS LS LS LS LS UNIT COST 46,060) --------- 5,221 -- COST($000) 22,786 (22,339) (447) 2,054 (210) (86) (385) (50) (684) (120) (85) (434) --------- ESTIMATED CONTRACT COST CONTINGENCY (5.00%) SUBTOTAL SUPV, INSP & OVERHEAD (3.52%) TOTAL REQUEST TOTAL FEDERAL REQUEST TOTAL FEDERAL REQUEST (ROUNDED) INSTALLED EQT-OTHER APPROP 24,840 1,242 26,082 918 27,000 27,000 27,000 (2,828) 10. Description of Proposed Construction A standard design Mission Training Complex (Small) of permanent construction. The Simulations Center includes the following items that are integral to the facility: specific building information systems for simulation system. Comprehensive interior design services are requested. This facility will be designed to meet Industry Standards as well as all local, State, and Federal building codes and as per 42 U.S.C. 4154. Construction will include all utility services, information systems, fire detection and alarm systems, roads, walks, curbs, gutters, storm drainage, parking areas and site improvements. Facilities will be designed to a minimum life of 50 years in accordance with DoW's Unified Facilities Code (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance as per ASA(IE&E) Sustainable Design and Development Policy Updated 2017. Access for individuals with disabilities will be provided. Antiterrorism measures in accordance with the DoW Minimum Antiterrorism for building standards will be provided. This project will comply with the Army 1 SQFT for 1 SQFT disposal policy through the disposal of 27,982 SQFT. Air Conditioning (Estimated 542 kW/154 Tons). 11. REQ: 4,279 m2 ADQT: NONE SUBSTD: NONE PROJECT: To construct a 46,060 SQFT standard design Mission Training Complex (Small) that supports training, administrative, and logistical requirements for the IDARNG. The underlying land of the planned location is owned by the State of Idaho. (Current Mission) REQUIREMENT: This project is required to support individual and collective digital DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 11 === page 34 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Camp Orchard Cantonment Area; Idaho 5. PROGRAM ELEMENT RPSUID: 6649 6. CATEGORY CODE Mission Training Complex (Small) 7. PROJECT NUMBER 8. PROJECT COST ($000) 0505896A 17213 160175 Approp 27,000 REQUIREMENT: (CONTINUED) training and battle staff training using constructive simulations with command, control, communications, computers and intelligence (C4I) interoperability. This project is required to provide effective training in the command and control of individual, and combined operations in a simulated tactical environment. This project is required to support several different levels of battle command training for contingency force units and various additional combat, combat support, and combat service support units. Battle simulations and command post exercises are conducted at Company, Battalion, Brigade, Division, Corps and Joint levels. Size and complexity of battle command training using simulations and C4I systems have increased significantly. CURRENT SITUATION: This project is critical to the state of ID due to the current situation of MTC Orchard was nominated to compete as the first ARNG MTC to receive an TSS-E standard design MTC due to the increased projected on-site training to be conducted at Orchard Training Area with the ABCT/SBCTs ARNG 4.0 readiness requirements including enhanced XCTC MC capabilities. OTC could be charged as the primary training MTC for all ABCT/SBCTs in the ARNG along with the other 11 states, 1 DIV, 19 BCT/BDEs, 76 BNs/total 107 OTC already supports. The site for this project is in the possession of the state of ID. Currently, the state of ID has begun the environmental assessment on this project. This project will mitigate the event of having an undersized facility to support the training and readiness of Soldiers of the IDARNG. Being that there currently is four undersized and aging facilities to accomplish the mission objectives. The probability of impacting training is "PROBABLE". The result of not having an adequate facility will cause a "MINOR" threat to the safety and well-being of the Soldiers of the IDARNG. Site Code 16A20 Site UID Cat Code 17213 FACNO ISR-I Year F Q C Local Rating Rating Rating Name NO FACILITY Some of the current facilities that are used are lacking in current building codes. Outdated electrical systems, non compliant ADA, and lack of latrines are just a few of the deficiencies. As no facility exists to perform this mission the MTC must use other facilities when available to perform the mission. These facilities are often WWII warehouse facilities in order to accommodate the space required. These facilities are often red or black in ISR as they are past their design life, failing facilities, and do not meet the current space requirements of NG PAM 415-12. These facilities do not meet current standards, lack communications, latrines, administrative space, and storage space. The facilities do not comply with current ADA standards. IMPACT IF NOT PROVIDED: If this project is not provided, the IDARNG will not have adequate Battle Command Training and Simulation Enhanced Facilities for individual and collective digital and battle staff training. The quality of battle command and staff simulation exercises and unit C4I expertise will decline. Essential training and skill DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 12 === page 35 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Camp Orchard Cantonment Area; Idaho 5. PROGRAM ELEMENT 6. CATEGORY CODE RPSUID: 6649 Mission Training Complex (Small) 7. PROJECT NUMBER 8. PROJECT COST ($000) 0505896A 17213 160175 Approp 27,000 IMPACT IF NOT PROVIDED: (CONTINUED) development will not be able to keep pace with mission demands. ADDITIONAL: Sustainable principles will be integrated into the design, development, and construction of the project in accordance with Executive Order 13423 and other applicable laws and Executive Orders. PHYSICAL SECURITY: This project has been coordinated with the installation physical security plan and all physical security measures are included. ANTITERRORISM/FORCE PROTECTION: This project has been coordinated with the installation antiterrorism plan. Risk and threat analyses have been performed in accordance with DA Pam 190-51 and TM 5-853-1, respectively. Protective measures required by regulation and the minimum standards as required by UFC 4-010-01 (Department of War Minimum Antiterrorism Standards for Buildings) are needed. These requirements are included in the description of construction and cost estimate. ECONOMIC ANALYSIS: Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. JOINT USE CERTIFICATION: The Deputy Assistant Secretary of the Army (Installations and Housing) certifies that this project has been considered for joint use potential. This facility will be available for use by other components. Required assessments have been made for supporting facilities and the project is not in a 100-year floodplain in accordance with Executive Order 11988. 12. SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-bid-build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis performed: (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE DEC/2024 60% 95% MAR/2026 2,352 NO YES OCT/2026 NOV/2026 OCT/2028 PAGE NO. 13 === page 36 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Camp Orchard Cantonment Area; Idaho 5. PROGRAM ELEMENT RPSUID: 6649 6. CATEGORY CODE Mission Training Complex (Small) 7. PROJECT NUMBER 8. PROJECT COST ($000) 0505896A 17213 160175 Approp 27,000 12. SUPPLEMENTAL DATA (CONTINUED..) B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) F F & E Info Sys - ISC Info Sys - PROP Component POC: DD FORM 1391C, JUL 1999 OMNG OPA OMNG 2028 2028 2028 840 37 1,951 ARNG MILCON Budget Officer PREVIOUS EDITION IS OBSOLETE PAGE NO. 14 === page 37 === 1. COMPONENT FY 2027 GUARD AND RESERVE ARNG MILITARY CONSTRUCTION 2. DATE APRIL 2026 3. INSTALLATION AND LOCATION Abbeville RC; 4. AREA CONSTRUCTION RPSUID: 195002 COST INDEX Louisiana .82 5. FREQUENCY AND TYPE OF UTILIZATION Administration 5 days/week, with 2-day training assembly 2-3 times/month. 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS ARNG New Iberia, LA 18.00 miles Readiness Center 1,757 m2 (18,917 SF) 1973 ARNG Lafayette, LA 24.00 miles Readiness Center 4,629 m2 (49,831 SF) 1949 ARNG Lafayette, LA 24.00 miles Maintenance Facility 787 m2 (8,470 SF) 1990 7. PROJECTS REQUESTED IN THIS PROGRAM CATEGORY PROJECT TITLE CODE NATIONAL GUARD READINESS CENTER 17180 DESIGN STATUS COST 4,485 m2 SCOPE ($000) START CMPL (48,279 SF) 23,000 OCT 2023 JAN 2027 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 31 JUL 2025 FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. 9. LAND ACQUISITION REQUIRED None 0 (Number of acres) 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY CODE COST PROJECT TITLE SCOPE ($000) NONE A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. 11. PERSONNEL STRENGTH AS OF 29 MAY 2025 PERMANENT GUARD/RESERVE TOTAL OFFICER ENLISTED CIVILIAN TOTAL OFFICER ENLISTED AUTHORIZED 23 4 19 0 125 19 106 ACTUAL 23 4 19 0 125 19 106 UIC TPSN 12. RESERVE UNIT DATA STRENGTH UNIT DESIGNATION MTOE/TDA AUTHORIZED ACTUAL 98 HHC (BN INF BN (IBCT)) WPQQT0 07215KNG09 98 Co G (Bn Bde Spt Bn W/ FSC) WQP1G1 63035KNG68 8 8 106 106 Assigned/Authorized: 100% 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE DD FORM MAY 78 AUTHORIZED ACTUAL WHEELED 28 28 TRAILERS 32 32 TRACKED 0 0 EQUIPMENT > 30 FT 1 1 Fuel Truck 0 0 HET 0 0 TOTALS 61 61 1390s1 PREVIOUS EDITION MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 15 === page 38 === 1. COMPONENT FY 2027 GUARD AND RESERVE ARNG MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION Abbeville RC; 2. DATE APRIL 2026 4. AREA CONSTRUCTION RPSUID: 195002 COST INDEX .82 Louisiana 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) DD A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 FORM MAY 78 1390s2 PREVIOUS EDITION MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 16 === page 39 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION Abbeville RC; Louisiana 5. PROGRAM ELEMENT 0505896A 4. PROJECT TITLE RPSUID: 195002 NATIONAL GUARD READINESS CENTER 6. CATEGORY CODE 17180 7. PROJECT NUMBER 220161 8. PROJECT COST ($000) Approp 23,000 9. COST ESTIMATES ITEM UM (M/E) QUANTITY UNIT COST COST($000) PRIMARY FACILITY 24,252 17180 Readiness Center m2 (SF) 3,867 ( 41,622) 5,350 (20,686) 21411 Detached General Purpose Trainin m2 (SF) 388.52 ( 4,182) 4,198 (1,631) 44224 Unheated Storage Building m2 (SF) 135.17 ( 1,455) 2,099 (284) 44228 Controlled Waste Facility m2 (SF) 30.66 ( 330) 1,722 (53) 44240 Flammable Materials Facility m2 (SF) 10.22 ( 110) 1,722 (18) Total from Continuation page(s) (1,580) SUPPORTING FACILITIES 3,989 Electric Service LS --(100) Water, Sewer, Gas LS --(472) Steam/Chilled Water Distribution LS --(138) Paving, Walks, Curbs And Gutters LS --(1,238) Storm Drainage LS --(264) Site Imp(749) Demo( ) LS --(749) Information Systems LS --(83) Antiterrorism Measures LS --(332) Other LS --(613) ESTIMATED CONTRACT COST 28,241 1,412 CONTINGENCY (5.00%) SUBTOTAL 29,653 SUPV, INSP & OVERHEAD (3.42%) 1,014 TOTAL REQUEST 30,667 State Share 7,667 TOTAL FEDERAL REQUEST 23,000 TOTAL FEDERAL REQUEST (ROUNDED) 23,000 INSTALLED EQT-OTHER APPROP (1,551) 10. Description of Proposed Construction A specially designed National Guard Readiness Center of permanent construction. The National Guard Readiness Center includes the following items that are integral to the facility: Backup/Emergency Generator, Organizational Vehicle Parking (Paved), Controlled Waste Facility, Flammable Materials Facility, Unheated Storage Building, Detached General Purpose Training Bay, Overhead Protection, and Electric Power, Photovoltaic. Comprehensive Interior Design services are requested. This facility will be designed to meet industry standards as well as all Local, State, and Federal Building codes as per 42 U.S. Code 4154. Construction will include all utility services, information systems, fire detection and alarm systems, roads, walks, curbs, gutters, storm drainage, parking areas and site improvements. Facilities will be designed to a minimum life of 50 years in accordance with DoW's Unified Facilities Code (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance as per ASA (IE&E) Sustainable Design and Development Policy updated 2017. Access for individuals with disabilities will be provided. Antiterrorism measures in accordance with the DoW Minimum Antiterrorism for building standards will be provided. This project will comply with the Army 1 SQFT for 1 SQFT disposal policy through the disposal of 48,283 SQFT. Disposal of 3 buildings at Abbeville Readiness Center, LA (Total 1,541 m2/16,585 SF), 1 building at Lafayette Readiness Center, LA (Total 840 m2/9,046 SF), 6 buildings at Camp Minden Training Site, LA (Total 258 m2/2,777 SF), 17 buildings DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 17 === page 40 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION Abbeville RC; Louisiana 4. PROJECT TITLE RPSUID: 195002 5. PROGRAM ELEMENT NATIONAL GUARD READINESS CENTER 6. CATEGORY CODE 7. PROJECT NUMBER 0505896A 17180 9. COST ESTIMATES (CONTINUED) 8. PROJECT COST ($000) 220161 ITEM UM (M/E) PRIMARY FACILITY (CONTINUED) 81160 Backup/Emergency Generator 85210 Rigid Pavement for MEP 14179 Overhead Protection Sustainability/Energy Measures Antiterrorism Measures EA m2 (SY) m2 (SF) LS LS 23,000 Approp UNIT COST QUANTITY 1 -2,717 ( 53.88 ( --- 3,250) 580) COST ($000) 224,000 167.44 713.70 --Total (224) (455) (38) (304) (559) 1,580 DESCRIPTION OF PROPOSED CONSTRUCTION: (CONTINUED) at Camp Beauregard, LA (Total 637 m2/6,855 SF), and 1 building at Winnfield Readiness Center, LA (Total 1,148 m2/12,357 SF). Air Conditioning (Estimated 478 kW/136 Tons). 11. REQ: 4,485 m2 ADQT: NONE SUBSTD: NONE PROJECT: To construct a 48,279 SQFT National Guard Readiness Center that supports training, administrative and logistical requirements for the LAARNG. The underlying land of the planned location is owned by the State of Louisiana. (Current Mission) REQUIREMENT: This facility is required to station the HHC(-) 2/256IN BN (WPQQTO) and the Det 1, Co G, 199 ESB (HHC 2-156). No other facilities are available to support these units. The facility is required to house the units mentioned above for peace-time training and ensure the equipment is prepared for mobilizations. The current facility is aged, lacks proper layout space for missions and is severely undersized in building and land. This 6 acre site is shared with an FMS. This project will be built on a different 6-parcel site, which is currently vacant, across the street from the existing site. The space where the existing Readiness Center now stands, once it is demolished, will serve to improve the operations of the FMS still on the current parcel. CURRENT SITUATION: This project is critical to the state of Louisiana due to the current situation of soldiers working in a building which does not meet codes or criteria. Renovation is not a viable alternative because the 6 acre site is also shared with an FMS. The current facility only meets 40% of authorized space. The existing building is also located 43 feet from the town of Abbeville's main thoroughfare. The original RC was built in 1955 and most of the facility's major building systems such as MEP are failing and in need of total replacement. The footprint of the facility limits the ability to prepare convoys. Storage space is very limited. There is a severe deficiency in administrative offices and the existing space falls short in technology. Many offices do not have phone / data lines. The facility latrines are diminished in functionality due to size and fixture arrangement. The parking areas flood during rain event and drain slowly. The site is too small for compliance with ATFP requirements. The site for this project is State owned and State Accountable. The state of Louisiana has begun the environmental assessment on this project. The facility where the current operations are being conducted was constructed in 1955. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 18 === page 41 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION Abbeville RC; Louisiana 4. PROJECT TITLE RPSUID: 195002 5. PROGRAM ELEMENT NATIONAL GUARD READINESS CENTER 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) 0505896A 17180 220161 Approp 23,000 CURRENT SITUATION: (CONTINUED) This project will mitigate the "probability" of accidents due to severely outdated electrical systems, mold growth, termite damage and asbestos. A new facility will help reduce health issues such as headaches and fatigue due to inadequate lighting, exposed electrical wiring and mold. The power supply has outdated panels and insufficient wire to support power requirements. Heat can be felt from electrical boxes in latrine area. These issues generated a RAC code of 2 which is a "high" threat to the safety and wellbeing of the soldiers of the LAARNG. The inadequate electrical system and outdated panels cause issues with power supply. Temporary wiring plugged into non GFCI recepticles, in the kitchen area, can cause electrical hazards. In the male latrine the A/C unit junction box is warm to the touch and makes loud noise while the unit is in operation. This box is located next to a water source: showers. The cost to repair the existing facility will exceed SRM allowances and the site will not support new requirements. Site Code 22A05 Site UID 3696 Cat Code 17180 FACNO 00001 ISR-I Year 2024 F Q C Local Rating Rating Rating Name F4 Q4 C3 Abbeville The existing facility does not comply with the NG Pam 415-12 dated 25 Jan. 2015 criteria, Installation Status Report (ISR) Mission and Quality, current code requirements, ATFP and ADA and lacks adequate training areas, administration space, supply room space, kitchen space, toilets/showers, physical fitness space, locker room space, privately owned vehicle parking, military parking and unheated storage space. IMPACT IF NOT PROVIDED: If this project is not provided, the assigned units' ability to meet readiness and training objectives will continue to be adversely impacted. Delays in the funding of this project will force the continued use of an unsafe, inadequate facility and the space deficiencies will continue to negatively impact mission readiness and morale. The lack of proper and adequate training, logistical and administrative areas will continue to impair the attainment and sustainment of required readiness levels. Construction of this facility will reduce the Louisiana Army Guard's overall shortfall in 17180 space identified in the Army's Real Property Planning and Analysis System (RPLANS). The amount of O&M money required to bring to an ISR F2, Q2 rating would far exceed the cost of new construction. The 6 acre site, which is shared with an FMS, is so small that the facility does not meet ATFP requirements. The Abbeville area, has experienced growth over the past few years and the surrounding neighborhoods continue to encroach the existing Readiness Center site. ADDITIONAL: Sustainable principles, to include life cycle cost effective practices, will be integrated into the design, development and construction of the project and will follow the guidance detailed in the Army Sustainable Design and Development Policy complying with applicable laws and executive orders. PHYSICAL SECURITY: This project has been coordinated with the installation physical security plan, and all physical security measures are included. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 19 === page 42 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION Abbeville RC; Louisiana 5. PROGRAM ELEMENT 4. PROJECT TITLE RPSUID: 195002 NATIONAL GUARD READINESS CENTER 6. CATEGORY CODE 0505896A ADDITIONAL: (CONTINUED) 17180 7. PROJECT NUMBER 220161 8. PROJECT COST ($000) Approp 23,000 ANTITERRORISM/FORCE PROTECTION: This project has been coordinated with the installation antiterrorism plan. Risk and threat analyses have been performed in accordance with DA Pam 190-51 and TM 5-853-1, respectively. Protective measures required by regulation and the minimum standards as required by UFC 4-010-01 (Department of War Minimum Antiterrorism Standards for Buildings) are needed. These requirements are included in the description of construction and cost estimate. ECONOMIC ANALYSIS: Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. JOINT USE CERTIFICATION: The Deputy Assistant Secretary of the Army (Installations and Housing) certifies that this project has been considered for joint use potential. This facility will be available for use by other components. Required assessments have been made for supporting facilities and the project is not in a 100-year floodplain in accordance with Executive Order 11988. 12. SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-bid-build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis performed: (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE OCT/2023 35% 65% JAN/2027 1,904 NO NO MAR/2027 MAY/2027 MAR/2029 PAGE NO. 20 === page 43 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION Abbeville RC; Louisiana 5. PROGRAM ELEMENT 4. PROJECT TITLE RPSUID: 195002 NATIONAL GUARD READINESS CENTER 6. CATEGORY CODE 7. PROJECT NUMBER 8. PROJECT COST ($000) 0505896A 17180 220161 Approp 23,000 12. SUPPLEMENTAL DATA (CONTINUED..) B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) F F & E ESS Kitchen Equip (Type C) Info Sys - ISC Info Sys - PROP Component POC: DD FORM 1391C, JUL 1999 OMNG OPA OMNG OPA OMNG 2028 2028 2028 2028 2028 626 22 125 437 341 ARNG Budget Officer PREVIOUS EDITION IS OBSOLETE PAGE NO. 21 === page 44 === THIS PAGE INTENTIONALLY LEFT BLANK PAGE NO. 22 === page 45 === 1. COMPONENT FY 2027 GUARD AND RESERVE ARNG MILITARY CONSTRUCTION 2. DATE APRIL 2026 3. INSTALLATION AND LOCATION 4. AREA CONSTRUCTION MTA Camp Edwards; RPSUID: 6313 COST INDEX 1.17 Massachusetts 5. FREQUENCY AND TYPE OF UTILIZATION Administration 5 days/week, with 2-day training assembly 2-3 times/month. 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS ARNG Bourne, MA 8.00 miles Readiness Center 1,772 m2 (19,078 SF) 1957 ARNG Middleboro, MA 25.00 miles Readiness Center 1,707 m2 (18,376 SF) 1952 ARNG Hingham, MA 26.00 miles Readiness Center 3,720 m2 (40,037 SF) 1910 7. PROJECTS REQUESTED IN THIS PROGRAM CATEGORY PROJECT TITLE READINESS CENTER 17180 DESIGN STATUS COST NATIONAL GUARD CODE 4,503 m2 SCOPE ($000) START CMPL (48,469 SF) 43,000 APR 2022 MAY 2026 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 18 JUN 2024 FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. 9. LAND ACQUISITION REQUIRED None 0 (Number of acres) 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY CODE COST PROJECT TITLE SCOPE ($000) NONE A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. 11. PERSONNEL STRENGTH AS OF 24 APR 2024 PERMANENT GUARD/RESERVE TOTAL OFFICER ENLISTED CIVILIAN TOTAL OFFICER ENLISTED AUTHORIZED 8 0 8 0 214 11 203 ACTUAL 5 0 5 0 189 11 178 12. RESERVE UNIT DATA STRENGTH UNIT DESIGNATION UIC TPSN MTOE/TDA AUTHORIZED (CO VERTICAL CONSTRUCT) WX0LAA 30545 ACTUAL 05418RNG39 155 CO E (BN GEN SPT AVN BN (EC) WPNVE0 04742 140 01435KNG07 59 49 214 189 Assigned/Authorized: 88% 13. MAJOR EQUIPMENT AND AIRCRAFT AUTHORIZED ACTUAL WHEELED TYPE 81 81 TRAILERS 40 40 TRACKED 6 6 EQUIPMENT > 30 FT 8 8 Fuel Truck 1 1 HET 0 0 136 136 TOTALS DD FORM MAY 78 1390s1 PREVIOUS EDITION MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 23 === page 46 === 1. COMPONENT FY 2027 GUARD AND RESERVE ARNG MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION MTA Camp Edwards; RPSUID: 6313 2. DATE APRIL 2026 4. AREA CONSTRUCTION COST INDEX Massachusetts 1.17 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) DD A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 FORM MAY 78 1390s2 PREVIOUS EDITION MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 24 === page 47 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MTA Camp Edwards; RPSUID: 6313 Massachusetts 5. PROGRAM ELEMENT 0505896A NATIONAL GUARD READINESS CENTER 6. CATEGORY CODE 7. PROJECT NUMBER 17180 8. PROJECT COST ($000) 250148 43,000 Approp 9. COST ESTIMATES ITEM PRIMARY FACILITY 17180 Readiness Center 44224 Unheated Storage Building 44228 Controlled Waste Facility 44240 Flammable Materials Facility 81160 Backup/Emergency Generator Total from Continuation page(s) SUPPORTING FACILITIES Electric Service Water, Sewer, Gas Paving, Walks, Curbs And Gutters Storm Drainage Site Imp(1,842) Demo( ) Information Systems Antiterrorism Measures Other UM (M/E) QUANTITY m2 (SF) m2 (SF) m2 (SF) m2 (SF) EA 3,762 ( 689.43 ( 30.66 ( 20.44 ( 1 -- LS LS LS LS LS LS LS LS UNIT COST 40,498) 7,421) 330) 220) --------- 10,148 6,107 1,453 3,552 500,000 --------- COST($000) 45,596 (38,181) (4,210) (45) (73) (500) (2,587) 6,820 (2,150) (304) (1,401) (530) (1,842) (31) (446) (116) ESTIMATED CONTRACT COST CONTINGENCY (5.00%) SUBTOTAL SUPV, INSP & OVERHEAD (3.70%) TOTAL REQUEST State Share TOTAL FEDERAL REQUEST TOTAL FEDERAL REQUEST (ROUNDED) INSTALLED EQT-OTHER APPROP 52,416 2,621 55,037 2,036 57,073 14,250 42,823 43,000 (1,959) 10. Description of Proposed Construction A standard design National Guard Readiness Center of permanent construction. The National Guard Readiness Center includes the following items that are integral to the facility; Backup/Emergency Generator, Organizational Vehicle Parking (Paved), Controlled Waste Facility, Flammable Materials Facility, and Photovotaic. Comprehensive interior design services are requested. This facility will be designed to meet Industry Standards as well as all local, State, and Federal building codes and as per Public Law 90-480. Construction will include all utility services, information systems, fire detection and alarm systems, roads, walks, curbs, gutters, storm drainage, parking areas and site improvements. Facilities will be designed to a minimum life of 50 years in accordance with DoW's Unified Facilities Code (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance as per ASA(IE&E) Sustainable Design and Development Policy 2017. Access for individuals with disabilities will be provided. Antiterrorism measures in accordance with the DoW Minimum Antiterrorism for building standards will be provided. This project will comply with the Army 1 SQFT for 1 SQFT disposal policy through the disposal of 63,796 SQFT. Disposal of 1 building at Worcester Readiness Center, MA (Total 5,216 m2/56,146 SF). Air Conditioning (Estimated 668 kW/190 Tons). 11. REQ: 4,503 m2 DD FORM 1391, JUL 1999 ADQT: NONE PREVIOUS EDITION IS OBSOLETE SUBSTD: NONE PAGE NO. 25 === page 48 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MTA Camp Edwards; RPSUID: 6313 Massachusetts 5. PROGRAM ELEMENT NATIONAL GUARD READINESS CENTER 6. CATEGORY CODE 7. PROJECT NUMBER 0505896A 17180 9. COST ESTIMATES (CONTINUED) 8. PROJECT COST ($000) 250148 ITEM UM (M/E) PRIMARY FACILITY (CONTINUED) 85210 Rigid Pavement for MEP 00000 Cyber Security Measures Sustainability/Energy Measures m2 (SY) LS LS 43,000 Approp UNIT COST QUANTITY 6,083 ( --- 7,275) 135.15 --Total COST ($000) (822) (1,000) (765) 2,587 PROJECT: To construct a National Guard Readiness Center of 48,469 SQFT that supports training, administrative, and logistical requirements for the ARNG. This facility will be built on Federal land. (Current Mission) REQUIREMENT: This facility is designed to meet DA directed MTOE changes for the listed units authorized soldiers, within the transformed force structure of the MA ARNG, to address facility shortages and inadequacies as defined in the ISR-I. CURRENT SITUATION: This project is critical to the state of Massachusetts due to the current situation of the unit to occupy this National Guard Readiness Center is currently housed in inadequate facilities that do no offer the required assembly, storage, administrative, or parking necessary. The 181st EN CO is stationed in a shared facility with the Directorate of Facility Engineering (DFE). They only have 7,200 SQFT of administrative and storage space, an 82% deficiency in their required need. Currently they share 19,000 SQFT of POV parking with no dedicated organizational parking. The unit stores its military vehicles at the Camp Edwards training site. This inhibits the units ability to properly secure and maintain their equipment. The site for this project is in the possession of the state of Massachusetts. Currently, the state of Massachusetts has begun the environmental assessment on this project. The facility where the current operations are being conducted was constructed in 1973. Site Code 25175 25175 Site UID 6313 6313 Cat Code 17180 17180 FACNO 02808 2822 ISR-I Year 2016 2016 F Q C Local Rating Rating Rating Name F4 Q3 C3 DFE F4 Q3 C3 IMPACT IF NOT PROVIDED: If this project is not provided, the present facility's lack of adequate space will reduce maintenance efficiency, training and mobilization readiness standards. The 181 EN and E CO's lack of space requires their equipment to be stored improperly forcing equipment to be stored outdoors leading to potential damage and accountability issues. Lack of storage and training space requires travel to several other facilities negatively impacting OPTEMPO and retention by requiring additional travel time which should be used for training. Lack of adequate space for storage creates to a safety issue forcing soldiers to store equipment and OCIE in cramped storage and satellite facilities. Their lack of any classroom type space forces the unit to compete with other organizations for required space at the training site. Neither unit has DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 26 === page 49 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION 4. PROJECT TITLE MTA Camp Edwards; RPSUID: 6313 Massachusetts 5. PROGRAM ELEMENT 6. CATEGORY CODE NATIONAL GUARD READINESS CENTER 7. PROJECT NUMBER 8. PROJECT COST ($000) 0505896A 17180 250148 Approp 43,000 IMPACT IF NOT PROVIDED: (CONTINUED) sufficient parking available for Military vehicles or POV's. Current facilities do not meet required ATFP standards. ADDITIONAL: Required assessments have been made for supporting facilities and the project is not in a 100-year floodplain in-accordance-with Executive Order 11988. This project has been coordinated with the installation physical security plan, and all physical security measures are included. All required antiterrorism protection measures are included. Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. The Deputy Assistant Secretary of the Army (Installations, Housing and Partnerships) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. Sustainable principles, to include life cycle cost effective practices, will be integrated into the design, development and construction of the project and will follow the guidance detailed in the Army Sustainable Design and Development Policy - complying with applicable laws and executive orders. 12. SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-bid-build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis performed: (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: APR/2022 60% 60% MAY/2026 3,671 YES NO MAR/2027 APR/2027 APR/2029 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Nomenclature Appropriation Or Requested Cost ($000) F F & E Kitchen Equipment (Type C) ESS (171R) Info Sys - ISC Info Sys - PROP 1,200 50 54 274 381 Component POC: DD FORM 1391C, JUL 1999 OMNG OMNG OPA OPA OMNG 2028 2028 2028 2028 2028 ARNG MILCON Budget Officer PREVIOUS EDITION IS OBSOLETE PAGE NO. 27 === page 50 === THIS PAGE INTENTIONALLY LEFT BLANK PAGE NO. 28 === page 51 === 1. COMPONENT FY 2027 GUARD AND RESERVE ARNG MILITARY CONSTRUCTION 2. DATE APRIL 2026 3. INSTALLATION AND LOCATION Colonie; 4. AREA CONSTRUCTION RPSUID: 195455 COST INDEX New York 1.05 5. FREQUENCY AND TYPE OF UTILIZATION Administration 5 days/week, with 2-day training assembly 2-3 times/month. 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS ARNG LATHAM, NY 2.00 miles Readiness Center 14,141 m2 (152,212 SF) 1986 ARNG LATHAM, NY 2.00 miles Aviation Facility 2,634 m2 (28,354 SF) 1977 ARNG Queensbury, NY 50.00 miles Readiness Center 4,169 m2 (44,876 SF) 7. PROJECTS REQUESTED IN THIS PROGRAM CATEGORY PROJECT TITLE CODE National Guard Readiness Center 17180 DESIGN STATUS COST SCOPE 13,845 m2 (149,023 SF) ($000) START CMPL 90,000 AUG 2024 JAN 2027 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 30 MAY 2024 FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. 9. LAND ACQUISITION REQUIRED Site Acquired 21.20 (Number of acres) 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY CODE COST PROJECT TITLE SCOPE ($000) NONE A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. 11. PERSONNEL STRENGTH AS OF 15 JUL 2024 PERMANENT GUARD/RESERVE TOTAL OFFICER ENLISTED CIVILIAN TOTAL OFFICER ENLISTED AUTHORIZED 64 21 43 0 629 224 405 ACTUAL 64 21 43 0 629 224 405 UIC TPSN 12. RESERVE UNIT DATA STRENGTH UNIT DESIGNATION MTOE/TDA AUTHORIZED ACTUAL HHC (HHC DIV HQ AND HQ BN) WPR7T0 87000KNG40 263 263 SIG, INTEL, & SUS (SIS) CO (DIV) WPR7A0 87000KNG40 228 228 MCP-OD (DIV) WPR7B0 87000KNG40 89 89 DET, 1501st QM CO WP46A1 10450KNG01 49 49 629 629 Assigned/Authorized: 100% DD FORM MAY 78 1390s1 PREVIOUS EDITION MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 29 === page 52 === 1. COMPONENT FY 2027 GUARD AND RESERVE ARNG MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION Colonie; 2. DATE APRIL 2026 4. AREA CONSTRUCTION RPSUID: 195455 COST INDEX 1.05 New York 13. MAJOR EQUIPMENT AND AIRCRAFT AUTHORIZED ACTUAL WHEELED TYPE 153 153 TRAILERS 88 88 TRACKED 0 0 EQUIPMENT > 30 FT 5 5 Fuel Truck 0 0 HET 0 0 246 246 TOTALS 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) DD A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 FORM MAY 78 1390s2 PREVIOUS EDITION MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 30 === page 53 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION Colonie; New York 4. PROJECT TITLE RPSUID: 195455 National Guard Readiness Center 5. PROGRAM ELEMENT 0505896A 6. CATEGORY CODE 7. PROJECT NUMBER 17180 8. PROJECT COST ($000) 360211 90,000 Approp 9. COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY 17180 National Guard Readiness Center m2 (SF) 14171 Secure Operations Facility m2 (SF) 44224 Unheated Storage Building Additi m2 (SF) 81160 Backup/Emergency Generator EA 85210 Rigid Pavement for MEP m2 (SY) Total from Continuation page(s) SUPPORTING FACILITIES Electric Service LS Water, Sewer, Gas LS Paving, Walks, Curbs And Gutters LS Storm Drainage LS Site Imp(3,023) Demo( ) LS Information Systems LS Antiterrorism Measures LS Other LS QUANTITY UNIT COST 12,824 ( 138,032) 7,050 678.94 ( 7,308) 7,479 342.16 ( 3,683) 1,764 1 -500,000 6,689 ( 8,000) 261.92 --------- --------- COST($000) 102,549 (90,411) (5,078) (604) (500) (1,752) (4,204) 7,759 (477) (262) (2,528) (782) (3,023) (175) (311) (201) ESTIMATED CONTRACT COST CONTINGENCY (5.00%) SUBTOTAL SUPV, INSP & OVERHEAD (3.61%) TOTAL REQUEST State Share TOTAL FEDERAL REQUEST TOTAL FEDERAL REQUEST (ROUNDED) INSTALLED EQT-OTHER APPROP 110,308 5,515 115,823 4,181 120,004 30,000 90,004 90,000 (3,985) 10. Description of Proposed Construction A specially designed National Guard Readiness Center of permanent construction. The National Guard Readiness Center includes the following items that are integral to the facility; Backup/Emergency Generator, Organizational Vehicle Parking (Paved). Comprehensive interior design services are requested. This facility designed to meet Industry Standards as well as all local, State, and Federal will be building codes and as per 42 U.S. Code 4154. Construction will include all utility services, information systems, fire detection and alarm systems, roads, walks, curbs, gutters, storm drainage, parking areas and site improvements. Facilities will be designed to a minimum life of 50 years in accordance with DoW's Unified Facilities Code (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance as per ASA(IE&E) Sustainable Design and Development Policy updated 2017. Access for individuals with disabilities will be provided. Antiterrorism measures in accordance with the DoW Minimum Antiterrorism for building standards will be provided. This project will comply with the Army 1 SQFT for 1 SQFT disposal policy through the disposal of 150,287 SQFT. Disposal of 1 building at Culver Rd Readiness Center, NY (Total 6,780 m2/72,980 SF). Air Conditioning (Estimated 1,199 kW/341 Tons). 11. REQ: 13,845 m2 PROJECT: To construct a 138,032 SQFT National Guard Readiness Center and 7,308 SQFT DD FORM 1391, JUL 1999 ADQT: NONE PREVIOUS EDITION IS OBSOLETE SUBSTD: NONE PAGE NO. 31 === page 54 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION Colonie; New York 4. PROJECT TITLE RPSUID: 195455 National Guard Readiness Center 5. PROGRAM ELEMENT 6. CATEGORY CODE 7. PROJECT NUMBER 0505896A 17180 9. COST ESTIMATES (CONTINUED) 8. PROJECT COST ($000) 360211 ITEM UM (M/E) PRIMARY FACILITY (CONTINUED) 00000 Cyber Security Measures Sustainability/Energy Measures Antiterrorism Measures 90,000 Approp QUANTITY LS LS LS ---- UNIT COST ---Total COST ($000) (1,000) (1,294) (1,910) 4,204 PROJECT: (CONTINUED) Secure Operations Facility for a Division Headquarters with supporting structures that supports individual and collective training, administrative, automation and communications, and logistical requirements for the NYARNG. This facility will be built on State Land. (Current Mission) REQUIREMENT: This facility is designed to meet the administrative, logistical and operational requirements for the following units: WPR7T0 - 42nd HQ & SPT CO (DIV) WPR7A0 - SIG, INTEL, & SUS (SIS) CO (DIV) WPR8B0 - MCP-OD (DIV) WP46A1 - 1501st Quartermaster Company This facility will provide 149,023 SQFT of 176,740 SQFT of requirement as per NG PAM 41512 standards. CURRENT SITUATION: This project is critical to the State of New York due the Army Material Command (Component 1) issuing a notice to the New York National Guard to vacate the National Guard enclave at Watervliet Arsenal, NY. The Watervliet National Guard Enclave contains facilities occupied by a United States Property and Fiscal Office (USPFO) and a Central Issue Facility (CIF) of the New York National Guard. Thus, the USPFO and the CIF are being displaced. In accordance with DoWI 1225.08, the Army must provide reasonable replacement facilities for NYARNG missions. The NYARNG has proposed relocating the UPFO and the CIF (3 miles) to the 1971 built Glenmore Road Armory in Troy, whose current occupant is the 42nd Infantry Division Headquarters and associated units. Then the 42nd Infantry Headquarters and associated units would move (10 miles) to the subject of this project, a new National Guard Readiness Center in Colonie, NY. The facilities at the Watervliet National Guard Enclave were constructed in 1865, 1918, 1942 and 2004. The Glenmore Road Armory was built in 1971. The current lead levels at the Watervliet Enclave exceed the ARNG requirements of 40ppm. Site Code 36E30 Site UID 7594 Cat Code 17180 DD FORM 1391C, JUL 1999 RPUID FACNO 221126 0001 ISR-I Year 2024 F Q C Local Rating Rating Rating Name F4 Q2 C1 Glenmore Road Armory PREVIOUS EDITION IS OBSOLETE PAGE NO. 32 === page 55 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION Colonie; New York 4. PROJECT TITLE RPSUID: 195455 5. PROGRAM ELEMENT National Guard Readiness Center 6. CATEGORY CODE 0505896A 17180 CURRENT SITUATION: (CONTINUED) 7. PROJECT NUMBER 360211 8. PROJECT COST ($000) Approp 90,000 The site for this project is in the possession of Albany County, New York. The State of New York has begun the environmental assessment on this project. The State of New York has conducted a preliminary design on this project. IMPACT IF NOT PROVIDED: If not provided the units' ability to meet their readiness and training objectives will continue to be adversely impacted without an adequate facility. In addition, the units and Soldiers in the related facilities will continue to be negatively impacted by overcrowding in their facilities. Delays in the funding of this project will force the continued use of inadequate facilities and the space deficiencies will continue to negatively impact Soldier readiness and morale. The lack of proper and adequate training, storage and administrative areas will continue to impair the attainment and sustainment of required readiness levels. Currently NYARNG is the #1 Large State recruiter and overall, #1 recruiter making sustainment vital to its future. Delaying or denying this new facility can severely impact NYARNG's ability to continue its paramount efforts in preparedness. Furthermore, if the USPFO and CIF are unable to be relocated from the Watervliet National Guard Enclave facilities to the Glenmore Road Armory, the Active Army's plans for the site of the Watervliet National Guard Enclave will be adversely impacted. ADDITIONAL: Required assessments have been made for supporting facilities and the project is not in a 100-year floodplain in-accordance-with Executive Order 11988. This project has been coordinated with the installation physical security plan, and all physical security measures are included. All required antiterrorism protection measures are included. Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. The Deputy Assistant Secretary of the Army (Installations, Housing and Partnerships) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. Sustainable principles, to include life cycle cost effective practices, will be integrated into the design, development and construction of the project and will follow the guidance detailed in the Army Sustainable Design and Development Policy - complying with applicable laws and executive orders. 12. SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-bid-build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis performed: DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE AUG/2024 60% 65% JAN/2027 10,837 NO PAGE NO. 33 === page 56 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION Colonie; New York 4. PROJECT TITLE RPSUID: 195455 5. PROGRAM ELEMENT National Guard Readiness Center 6. CATEGORY CODE 7. PROJECT NUMBER 0505896A 17180 360211 12. SUPPLEMENTAL DATA (CONTINUED..) A. Estimated Execution Data: (CONTINUED..) (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: 8. PROJECT COST ($000) Approp NO MAR/2027 MAY/2027 DEC/2029 B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Nomenclature Appropriation Or Requested F F & E Kitchen Equipment (Type C) Info Sys - ISC Info Sys - PROP Component POC: DD FORM 1391C, JUL 1999 OMNG OMNG OPA OMNG 90,000 2028 2028 2028 2028 Cost ($000) 2,000 53 1,338 594 ARNG MILCON Budget Officer PREVIOUS EDITION IS OBSOLETE PAGE NO. 34 === page 57 === 1. COMPONENT FY 2027 GUARD AND RESERVE ARNG MILITARY CONSTRUCTION 2. DATE APRIL 2026 3. INSTALLATION AND LOCATION 4. AREA CONSTRUCTION RPSUID: 7637 Tulsa; COST INDEX Oklahoma .90 5. FREQUENCY AND TYPE OF UTILIZATION Support logistical and operational activities 5 days/week and 1-2 weekends/month. 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS ANG Tulsa, OK 10.00 miles Aviation Facility 1,394 m2 (15,000 SF) 1985 ARNG Broken Arrow, OK 25.00 miles Readiness Center 18,395 m2 (198,000 SF) 2011 ARNG Broken Arrow, OK 20.00 miles Readiness Center 2,231 m2 (24,012 SF) 1991 7. PROJECTS REQUESTED IN THIS PROGRAM CATEGORY DESIGN STATUS COST CODE PROJECT TITLE 21114 Aircraft Maintenance Bay 4,157 m2 SCOPE ($000) START CMPL (44,745 SF) 18,500 JUN 2023 SEP 2026 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 15 MAY 2025 FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. 9. LAND ACQUISITION REQUIRED None 0 (Number of acres) 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY CODE COST PROJECT TITLE SCOPE ($000) NONE A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. 11. PERSONNEL STRENGTH AS OF 14 MAY 2025 PERMANENT GUARD/RESERVE TOTAL OFFICER ENLISTED CIVILIAN TOTAL OFFICER ENLISTED AUTHORIZED 19 6 1 12 0 0 0 ACTUAL 19 6 1 12 0 0 0 12. RESERVE UNIT DATA STRENGTH UNIT DESIGNATION (EQP OK ARNG AVN SPT F) UIC TPSN MTOE/TDA W8QTAA AUTHORIZED ACTUAL 0 0 0 0 Assigned/Authorized: DD FORM MAY 78 1390s1 PREVIOUS EDITION MAY BE USED INTERNALLY UNTIL EXHAUSTED 0% PAGE NO. 35 === page 58 === 1. COMPONENT FY 2027 GUARD AND RESERVE ARNG MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION Tulsa; RPSUID: 7637 2. DATE APRIL 2026 4. AREA CONSTRUCTION COST INDEX Oklahoma .90 13. MAJOR EQUIPMENT AND AIRCRAFT AUTHORIZED ACTUAL WHEELED TYPE 8 8 TRAILERS 4 4 TRACKED 0 0 EQUIPMENT > 30 FT 0 0 Fuel Truck 0 0 HET 0 0 C-12D/F/R 0 0 C-12J 0 0 C-23 0 0 C-26 0 0 UC-35 0 0 OH-58 0 0 OH-58D 0 0 UH-1 0 0 AH-64 0 0 UH-60 10 10 UH-72A 0 4 CH-47 0 0 TOTALS 22 26 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) DD A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 FORM MAY 78 1390s2 PREVIOUS EDITION MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 36 === page 59 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Tulsa; RPSUID: 7637 Oklahoma 5. PROGRAM ELEMENT 0505896A Aircraft Maintenance Bay 6. CATEGORY CODE 7. PROJECT NUMBER 21114 8. PROJECT COST ($000) 401302 18,500 Approp 9. COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY 21114 Aircraft Maintenance Bay m2 (SF) 44263 Vehicle Storage Building, Instal m2 (SF) Sustainability/Energy Measures LS 21113 Aircraft Parts Storage m2 (SF) 00000 cybersecurity LS SUPPORTING FACILITIES Electric Service Water, Sewer, Gas Paving, Walks, Curbs And Gutters Storm Drainage Site Imp(300) Demo( ) Information Systems Antiterrorism Measures Exterior Fire Protection QUANTITY 3,545 ( 297.38 ( -314.20 ( -- LS LS LS LS LS LS LS LS UNIT COST 38,162) 3,201) 3,382) --------- 3,524 3,294 -4,084 -- COST($000) 15,297 (12,493) (980) (291) (1,283) (250) 1,090 (42) (124) (312) (211) (300) (24) (20) (57) --------- ESTIMATED CONTRACT COST CONTINGENCY (5.00%) SUBTOTAL SUPV, INSP & OVERHEAD (3.52%) DESIGN/BUILD-DESIGN COST (4.00%) TOTAL REQUEST TOTAL FEDERAL REQUEST TOTAL FEDERAL REQUEST (ROUNDED) INSTALLED EQT-OTHER APPROP 16,387 819 17,206 606 688 18,500 18,500 18,500 (0) 10. Description of Proposed Construction A specially designed Aircraft Storage Hangar of permanent construction. The Aircraft Storage includes the following items that are integral to the facility: Vehicle Storage Building, Installation Ground Support Equipment, Aircraft Parts Storage, Cybersecurity and Sustainability. Comprehensive interior design services are requested. This facility will be designed to meet Industry Standards as well as all local, State, and Federal building codes and as per 42 U.S. Code 4154. Construction will include all utility services, information systems, fire detection and alarm systems, roads, walks, curbs, gutters, storm drainage, parking areas and site improvements. Facilities will be designed to a minimum life of 50 years in accordance with DoW's Unified Facilities Code (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance as per ASA(IE&E) Sustainable Design and Development Policy updated 2017. Access for individuals with disabilities will be provided. Antiterrorism measures in accordance with the DoW Minimum Antiterrorism for building standards will be provided. this project will comply with the Army 1 SQFT for 1 SQFT disposal policy through the disposal of 45,130 SQFT. Air Conditioning (Estimated 11 kW/3 Tons). 11. REQ: 4,157 m2 ADQT: NONE SUBSTD: NONE PROJECT: To provide a 44,745 SF unheated aircraft storage hangar that supports logistical requirements for the OKARNG. The underlying land of the planned location is DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 37 === page 60 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Tulsa; RPSUID: 7637 Oklahoma 5. PROGRAM ELEMENT 6. CATEGORY CODE Aircraft Maintenance Bay 7. PROJECT NUMBER 8. PROJECT COST ($000) 0505896A 21114 401302 Approp 18,500 PROJECT: (CONTINUED) owned by the State of Oklahoma. (Current Mission) REQUIREMENT: This facility is designed to meet the critical equipment requirement for the proper storage of UH-60M and UH-72 aircrafts to protect the airframe and electronics components from the environment and reduce maintenance requirements. The facility will fill the deficit for Aircraft storage there is currently a shortage of 34,808 sf. The supported units are: UIC: W8QTAA EQP OK ARNG Avn Spt Facility UIC: WYDCC0 UIC: WYDCT1 UIC: WYDCD1 UIC: WYDCE1 UIC: WTKGC1 UIC: WPJPB0 CURRENT SITUATION: This project is critical to the state of Oklahoma due to the current situation of the UH-60M and UH-72s currently stored on the tarmac without any overhead protection. The Army Aviation Support Facility only has hangar space for aircraft in maintenance and is unable support storage of aircraft in the event of severe weather. Storage of aircraft on the tarmac does not provide protection for critical electronics of the aircraft causing an increase in maintenance cost in labor and parts. The estimated cost of one UH-60M aircraft is $21.3 million and this facility will support 10 aircraft at a total cost of $213 million in equipment storage. A similar instance of a hail storm caused $3.2 million in damage to aircraft and a downtime of 90 days in repairs. The site for this project is in the possession of the state of Oklahoma. Currently, the state of Oklahoma has begun the environmental assessment on this project. There currently is no facility to complete the mission. This project will mitigate the event of not having permanent aircraft storage facilities to store helicopters of the OKARNG from the ever-changing weather of Oklahoma. To begin with, there currently are no permanent facilities to accomplish the proper protection of the aircraft. The probability of impacting mission requirements is "LIKELY". The result of not having a permanent training facility is causing a "CATASTROPHIC" threat to the safety and well being of the citizens of Oklahoma in the event of a state emergency and to the aviation operations of the OKARNG. Currently helicopters are jammed into current aviation hanger that is not configured or large enough to accommodate all helicopters in the event of a significant storm. The actions to try to keep as many helicopters out of the weather does brings up many concerns of overloading the facility and may cause some safety concerns for personal moving aircraft around the hangar. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 38 === page 61 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Tulsa; RPSUID: 7637 Oklahoma 5. PROGRAM ELEMENT Aircraft Maintenance Bay 6. CATEGORY CODE 7. PROJECT NUMBER 0505896A 21114 CURRENT SITUATION: (CONTINUED) Site Site Cat FACNO ISR-I Code UID Code Year 40E32 7637 21114 401302 8. PROJECT COST ($000) Approp 18,500 F Q C Local Rating Rating Rating Name F4 Q4 C4 No facility exist Aircraft overloading of the maintenance hangar does not met the fire or egress codes. The current facility is not in compliance with space compliance, and is completely out of compliance of all DoW, Army and NG PAM 415-12 criteria. IMPACT IF NOT PROVIDED: If this project is not provided, UH-60M and UH-72 airframes and electronic maintenance will continue to rise at a time when operation and maintenance budgets are decreasing. Aircraft will spend more time in maintenance or waiting on parts, thus preventing pilots from achieving their required flight hours. The estimated cost of one UH-60M aircraft is $21.3 million and this facility will support 10 aircraft at a total cost of $213 million in equipment storage. A similar instance of a hail storm caused $3.2 million in damage to aircraft and a downtime of 90 days in repairs. ADDITIONAL: Sustainable principles, to include life cycle cost effective practices, will be integrated into the design, development and construction of the project and will follow the guidance detailed in the Army Sustainable Design and Development Policy complying with applicable laws and executive orders. PHYSICAL SECURITY: This project has been coordinated with the installation physical security plan, and all physical security measures are included. ANTITERRORISM/FORCE PROTECTION: This project has been coordinated with the installation antiterrorism plan. Risk and threat analyses have been performed in accordance with DA Pam 190-51 and TM 5-853-1, respectively. Protective measures required by regulation and the minimum standards as required by UFC 4-010-01 (Department of War Minimum Antiterrorism Standards for Buildings) are needed. These requirements are included in the description of construction and cost estimate. ECONOMIC ANALYSIS: Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. JOINT USE CERTIFICATION: The Deputy Assistant Secretary of the Army (Installation and Housing) certifies that this project has been considered for joint use potential. Mission requirements, operational considerations, and location are incompatible with use by other components. Required assessments have been made for supporting facilities and the project is not in a 100-year floodplain in-accordance-with Executive Order 11988. 12. SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-build (2) Design Data (a) Design or Request for Proposal(RFP) Started: DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE JUN/2023 PAGE NO. 39 === page 62 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Tulsa; RPSUID: 7637 Oklahoma 5. PROGRAM ELEMENT 6. CATEGORY CODE Aircraft Maintenance Bay 7. PROJECT NUMBER 8. PROJECT COST ($000) 0505896A 21114 401302 Approp 12. SUPPLEMENTAL DATA (CONTINUED..) A. Estimated Execution Data: (CONTINUED..) (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis performed: (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Nomenclature Appropriation Or Requested F F & E ESS (211A) Info Sys - ISC Info Sys - PROP Component POC: DD FORM 1391C, JUL 1999 OMNG OPA OPA OMNG 2028 2028 2028 2028 18,500 35% 65% SEP/2026 343 NO NO MAR/2027 MAY/2027 MAR/2029 Cost ($000) 457 65 76 46 ARNG MILCON Budget Officer PREVIOUS EDITION IS OBSOLETE PAGE NO. 40 === page 63 === 1. COMPONENT FY 2027 GUARD AND RESERVE ARNG MILITARY CONSTRUCTION 2. DATE APRIL 2026 3. INSTALLATION AND LOCATION Yakima Training Center; 4. AREA CONSTRUCTION RPSUID: 7984 COST INDEX Washington 1.05 5. FREQUENCY AND TYPE OF UTILIZATION Support logistical and operational activities for training 294 days/year. 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS ARNG Yakima Training Cent 0.00 miles Readiness Center AR Armed Forces Reserve 0.00 miles USAR Center DoW Yakima Training Cent 0.00 miles Base 2,399 m2 (25,821 SF) 1994 824 m2 (8,873 SF) 2010 9,290,300 m2 (99,999,999 SF)1940 7. PROJECTS REQUESTED IN THIS PROGRAM CATEGORY DESIGN STATUS COST CODE PROJECT TITLE 72210 Dining Facility 525 m2 SCOPE ($000) START CMPL (5,653 SF) 18,000 SEP 2023 AUG 2025 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 09 AUG 2023 FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. 9. LAND ACQUISITION REQUIRED None 0 (Number of acres) 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY CODE COST PROJECT TITLE SCOPE ($000) NONE A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. 11. PERSONNEL STRENGTH AS OF 27 MAY 2024 PERMANENT GUARD/RESERVE TOTAL OFFICER ENLISTED CIVILIAN TOTAL OFFICER ENLISTED AUTHORIZED 20 0 20 0 63 3 60 ACTUAL 20 0 20 0 63 3 60 UIC TPSN MTOE/TDA AUTHORIZED W8FFA1 66751 NGW8FFAA 63 63 63 63 12. RESERVE UNIT DATA STRENGTH UNIT DESIGNATION 1ST BN, 205TH (GS) RTI ACTUAL Assigned/Authorized: 100% 13. MAJOR EQUIPMENT AND AIRCRAFT TYPE DD FORM MAY 78 AUTHORIZED ACTUAL WHEELED 0 0 TRAILERS 0 0 TRACKED 0 0 EQUIPMENT > 30 FT 0 0 Fuel Truck 0 0 HET 0 0 TOTALS 0 0 1390s1 PREVIOUS EDITION MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 41 === page 64 === 1. COMPONENT FY 2027 GUARD AND RESERVE ARNG MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION Yakima Training Center; 2. DATE APRIL 2026 4. AREA CONSTRUCTION RPSUID: 7984 COST INDEX Washington 1.05 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) DD A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 FORM MAY 78 1390s2 PREVIOUS EDITION MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 42 === page 65 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Yakima Training Center; Washington 5. PROGRAM ELEMENT 0505896A RPSUID: 7984 Dining Facility 6. CATEGORY CODE 7. PROJECT NUMBER 72210 8. PROJECT COST ($000) 531804 18,000 Approp 9. COST ESTIMATES ITEM UM (M/E) PRIMARY FACILITY 72210 Dining Facility m2 (SF) Sustainability/Energy Measures LS SUPPORTING FACILITIES Electric Service Water, Sewer, Gas Paving, Walks, Curbs And Gutters Storm Drainage Site Imp(314) Demo( ) Information Systems Antiterrorism Measures Exterior Fire Protection QUANTITY 525.18 ( -- LS LS LS LS LS LS LS LS UNIT COST 5,653) --------- ESTIMATED CONTRACT COST CONTINGENCY (5.00%) SUBTOTAL SUPV, INSP & OVERHEAD (6.50%) TOTAL REQUEST TOTAL FEDERAL REQUEST TOTAL FEDERAL REQUEST (ROUNDED) INSTALLED EQT-OTHER APPROP COST($000) 26,449 -- 14,944 (13,890) (1,054) --------- 1,155 (70) (220) (117) (250) (314) (14) (100) (70) 16,099 805 16,904 1,099 18,003 18,003 18,000 (1,022) 10. Description of Proposed Construction A specially designed Dining Facility of permanent construction. Comprehensive interior design services are requested. This facility will be designed to meet Industry Standards as well as all local, State, and Federal building codes and as per 42 U.S. Code 4154. Construction will include all utility services, information systems, fire detection and alarm systems, roads, walks, curbs, gutters, storm drainage, parking areas and site improvements. Facilities will be designed to a minimum life of 50 years in accordance with DoW's Unified Facilities Code (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance as per ASA (IE&E) Sustainable Design and Development Policy updated 2017. Access for individuals with disabilities will be provided. Antiterrorism measures in accordance with the DoW Minimum Antiterrorism for building standards will be provided. This project will comply with the Army 1 SQFT for 1 SQFT disposal policy through the disposal of 5,785 SQFT. Disposal of 1 building at Fort George Wright, WA (Total 537 m2/5,785 SF). Air Conditioning (Estimated 155 kW/44 Tons). 11. REQ: 5,653 PN ADQT: 20,580 PN SUBSTD: NONE PROJECT: To construct a 5,653 SQFT Dining Facility (DFAC) to support the TRADOC requirements for the WAARNG Regional Training Institute. The underlying land of the planned location is Department of War-owned and licensed to the State of Washington for ARNG use. The USPFO for Washington holds accountability. (Current Mission) REQUIREMENT: This facility is designed to meet the needs of the training population at DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 43 === page 66 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Yakima Training Center; Washington 5. PROGRAM ELEMENT RPSUID: 7984 6. CATEGORY CODE Dining Facility 7. PROJECT NUMBER 8. PROJECT COST ($000) 0505896A 72210 531804 Approp 18,000 REQUIREMENT: (CONTINUED) 205th Regimental Training Institute. This facility will support COMPOs 1, 2, and 3 military personnel and authorized civilians from all over the country benefiting multiple States and supporting a peak habitual student load of 100+ personnel and the recently constructed 128 bed barracks facility collocated at the Yakima Installation. CURRENT SITUATION: This project is critical to the State of Washington due to the current lack of dedicated DFAC to feed RTI training population at Yakima. Not having a DFAC causes a significant loss of training time while increasing costs. Currently the unit (205th RTI) uses a combination of commercial catering, TDY meals, off-post dining, and the Garrison Training Site's DFAC (when available). With a peak student load of over 125 students, the commercial feeding option is expensive and significantly adds to the operational costs of the RTI, plus the Yakima area has a very high per diem rate for TDY. Furthermore, cadre lose valuable training time with students to facilitate transportation on and off post for feeding. Site Code Site UID Cat FACNO ISR-I F Q C Local Code Year Rating Rating Rating Name 72210 F4 Q4 C4 No Facility IMPACT IF NOT PROVIDED: If this project is not provided and constructed it will have adverse effects on the ability of the unit to accomplish its mission and to compete for courses it would otherwise be completely qualified to deliver. The WAARNG RTI will have to continue to use a combination of commercial facilities off-post, contract TDY meals, and temporary intermittent use of the active component Garrison Training DFAC to feed the student population year-round. All of this continues to add to already mounting operation costs. Logistically, a distractor and hindrance to training will continue, as additional time and funds are expended on twice a day transportation of students to and from feeding facilities that are not collocated with RTI. ADDITIONAL: Sustainable principles, to include life cycle cost effective practices, will be integrated into the design, development and construction of the project and will follow the guidance detailed in the Army Sustainable Design and Development Policy complying with applicable laws and executive orders. PHYSICAL SECURITY: This project has been coordinated with the installation physical security plan, and all physical security measures are included. ANTITERRORISM/FORCE PROTECTION: This project has been coordinated with the installation antiterrorism plans. Risk and threat analyses have been performed in accordance with DA Pam 190-51 and TM 5-853-1, respectively. Protective measures required by regulation and additional protective measures, above the minimum required by UFC 4-010-01 (Department of War Minimum Antiterrorism Standards for Buildings), are needed to mitigate the threat. These requirements are included in the description of construction and cost estimate. ECONOMIC ANALYSIS: Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 44 === page 67 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Yakima Training Center; Washington 5. PROGRAM ELEMENT RPSUID: 7984 6. CATEGORY CODE 0505896A ADDITIONAL: (CONTINUED) requirement. Dining Facility 7. PROJECT NUMBER 72210 531804 8. PROJECT COST ($000) Approp 18,000 JOINT USE CERTIFICATION: The Deputy Assistant Secretary of the Army (Installation and Housing) certifies that this project has been considered for joint use potential. The facility will be available for use by other components. Required assessments have been made for supporting facilities and the project is not in a 100-year floodplain in accordance with Executive Order 11988. 12. SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-bid-build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis performed: (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Nomenclature Appropriation Or Requested F F & E Kitchen Equipment (Type C) Info Sys - ISC Info Sys - PROP Component POC: DD FORM 1391C, JUL 1999 OMNG OMNG OPA OMNG 2028 2028 2028 2028 SEP/2023 100% 100% AUG/2025 340 NO NO NOV/2026 JAN/2027 MAR/2029 Cost ($000) 900 50 20 52 ARNG MILCON Budget Officer PREVIOUS EDITION IS OBSOLETE PAGE NO. 45 === page 68 === THIS PAGE INTENTIONALLY LEFT BLANK PAGE NO. 46 === page 69 === 1. COMPONENT FY 2027 GUARD AND RESERVE 2. DATE APRIL 2026 MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION 4. AREA CONSTRUCTION Martinsburg Readiness Center; RPSUID: 194738 COST INDEX West Virginia .95 5. FREQUENCY AND TYPE OF UTILIZATION Administration 5 days/week, with 2-day training assembly 2-3 times/month. 6. OTHER ACTIVE/GUARD/RESERVE INSTALLATIONS WITHIN 15 MILE RADIUS ARNG Martinsburg, WV 1.00 miles Readiness Center 1,468 m2 (15,798 SF) 1976 ARNG Moorefield, WV 82.00 miles Readiness Center 5,351 m2 (57,600 SF) 2013 ARNG Elkins, WV 165.00 miles Readiness Center 4,773 m2 (51,377 SF) 2012 7. PROJECTS REQUESTED IN THIS PROGRAM CATEGORY PROJECT TITLE READINESS CENTER ADD/ALT 17180 DESIGN STATUS COST NATIONAL GUARD CODE 7,328 m2 SCOPE ($000) START CMPL (78,875 SF) 20,000 AUG 2024 OCT 2026 8. STATE GUARD/RESERVE FORCES FACILITIES BOARD RECOMMENDATION FACILITIES IDENTIFIED IN ITEM #6 HAVE BEEN EXAMINED BY THE STATE RESERVE FORCES 26 JUN 2024 FACILITIES BOARD FOR POSSIBLE JOINT USE/EXPANSION. THE BOARD RECOMMENDATIONS ARE (Date) UNILATERAL CONSTRUCTION. 9. LAND ACQUISITION REQUIRED None 0 (Number of acres) 10. PROJECTS PLANNED IN NEXT FOUR YEARS CATEGORY CODE COST PROJECT TITLE SCOPE ($000) NONE A SITE SURVEY HAS BEEN COMPLETED AND THE SITE IS SUITABLE FOR CONSTRUCTION OF THE PROPOSED PROJECT AT THE ESTIMATED COST INDICATED. 11. PERSONNEL STRENGTH AS OF 14 MAY 2025 PERMANENT GUARD/RESERVE TOTAL OFFICER ENLISTED CIVILIAN TOTAL OFFICER ENLISTED AUTHORIZED 22 1 21 0 365 14 351 ACTUAL 22 1 21 0 315 14 301 UIC TPSN MTOE/TDA 157th MP Co WP4VAA 31902 922nd EN Det WPM1AA 1528th FSC WPWUAA 12. RESERVE UNIT DATA STRENGTH UNIT DESIGNATION AUTHORIZED ACTUAL 19463KNG45 159 145 30504 05413KNG09 53 51 46328 63868KNG01 153 119 365 315 Assigned/Authorized: DD FORM MAY 78 1390s1 PREVIOUS EDITION MAY BE USED INTERNALLY UNTIL EXHAUSTED 86% PAGE NO. 47 === page 70 === 1. COMPONENT FY 2027 GUARD AND RESERVE 2. DATE APRIL 2026 MILITARY CONSTRUCTION 3. INSTALLATION AND LOCATION 4. AREA CONSTRUCTION Martinsburg Readiness Center; RPSUID: 194738 COST INDEX West Virginia .95 13. MAJOR EQUIPMENT AND AIRCRAFT AUTHORIZED ACTUAL WHEELED TYPE 132 132 TRAILERS 72 72 TRACKED 0 0 EQUIPMENT > 30 FT 6 6 Fuel Truck 0 0 HET 0 0 210 210 TOTALS 14. OUTSTANDING POLLUTION AND SAFETY DEFICIENCIES ($000) DD A. AIR POLLUTION 0 B. WATER POLLUTION 0 C. OCCUPATIONAL SAFETY AND HEALTH 0 FORM MAY 78 1390s2 PREVIOUS EDITION MAY BE USED INTERNALLY UNTIL EXHAUSTED PAGE NO. 48 === page 71 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Martinsburg Readiness Center; West Virginia 5. PROGRAM ELEMENT 0505896A RPSUID: 194738 6. CATEGORY CODE NATIONAL GUARD READINESS CENTER ADDITION/ALTERATION 7. PROJECT NUMBER 17180 8. PROJECT COST ($000) 540071 20,000 Approp 9. COST ESTIMATES ITEM PRIMARY FACILITY 17180 Readiness Center Alteration 17180 Readiness Center Addition 81160 Backup/Emergency Generator 85210 Rigid Pavement for MEP 00000 Cyber Security Measures Total from Continuation page(s) SUPPORTING FACILITIES Electric Service Water, Sewer, Gas Paving, Walks, Curbs And Gutters Storm Drainage Site Imp(75) Demo( ) Information Systems Antiterrorism Measures Other UM (M/E) QUANTITY m2 (SF) m2 (SF) EA m2 (SY) LS 7,054 ( 273.88 ( 1 -10,075 ( -- LS LS LS LS LS LS LS LS --------- UNIT COST 75,927) 2,948) 2,268 6,269 150,000 12,050) 220.06 -- --------- COST($000) 21,789 (15,995) (1,717) (150) (2,217) (1,000) (710) 2,770 (125) (75) (1,778) (200) (75) (30) (205) (282) ESTIMATED CONTRACT COST CONTINGENCY (5.00%) SUBTOTAL SUPV, INSP & OVERHEAD (3.41%) TOTAL REQUEST State Share TOTAL FEDERAL REQUEST TOTAL FEDERAL REQUEST (ROUNDED) INSTALLED EQT-OTHER APPROP 24,559 1,228 25,787 879 26,666 6,667 19,999 20,000 (2,254) 10. Description of Proposed Construction A specially designed National Guard Readiness Center, addition/alteration of permanent construction. The National Guard Readiness Center includes the following items that are integral to the facility: Kitchen, Backup/ Emergency Generator and Organizational Vehicle Parking (Paved). Comprehensive interior design services are requested. This facility will be designed to meet Industry Standards as well as all local, State, and Federal building codes and as per 42 U.S. Code 4154. Construction will include all utility services, information systems, fire detection and alarm systems, roads, walks, curbs, gutters, storm drainage, parking areas and site improvements. Facilities will be designed to a minimum life of 50 years in accordance with DoW's Unified Facilities Code (UFC 1-200- 02) including energy efficiencies, building envelope and integrated building systems performance as per ASA(IE&E) Sustainable Design and Development Policy updated 2017. Access for individuals with disabilities will be provided. Antiterrorism measures in accordance with the DoW Minimum Antiterrorism for building standards will be provided. This project will comply with the Army 1 SQFT for 1 SQFT disposal policy through the disposal of 90,901 SQFT. Disposal of 1 building at Martinsburg Readiness Center, WV (Total 1,468 m2/15,798 SF), 4 buildings at Moundsville Readiness Center, WV (Total 3,571 m2/38,442 SF), and 4 buildings at Point Pleasant Readiness Center, WV (Total 3,406 m2/36,661 SF). Air Conditioning (Estimated 471 kW/134 Tons). DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 49 === page 72 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Martinsburg Readiness Center; West Virginia 5. PROGRAM ELEMENT RPSUID: 194738 6. CATEGORY CODE NATIONAL GUARD READINESS CENTER ADDITION/ALTERATION 7. PROJECT NUMBER 0505896A 17180 9. COST ESTIMATES (CONTINUED) 540071 ITEM UM (M/E) PRIMARY FACILITY (CONTINUED) Sustainability/Energy Measures Antiterrorism Measures 11. REQ: 7,328 m2 8. PROJECT COST ($000) ADQT: 20,000 Approp QUANTITY LS LS --- NONE SUBSTD: UNIT COST --Total COST ($000) (355) (355) 710 7,054 m2 PROJECT: To construct a 78,875 SQFT National Guard Readiness Center that supports individual and collective training, administrative, automation and communications, and logistical requirements for the WVARNG. The underlying land of the planned location is owned by the Eastern West Virginia Airport Authority and leased to the State of West Virginia through March 1, 2071. (Current Mission) REQUIREMENT: This facility is designed to meet the administrative, logistical and operational requirements for the following units: WP4VAA 157th MP Co WPM1AA 922nd En Det WPWUAA 1528th FSC This facility will provide 78,875 SQFT of 78,875 SQFT of requirement as per NG PAM 415-12 standards. CURRENT SITUATION: This project is critical to the State of West Virginia due to the current state of the facilities that support the previously listed units and 365 Soldiers of the WVARNG. The current building is inefficient to heat and provides no cooling. The cost per square foot for heating is the highest in the state among the older buildings in state inventory. The 1528th FSC is new force structure to the state and is currently sharing space with the 922nd in the existing undersized armory, further exacerbating the lack of adequate space. The current facility is landlocked and is being encroached upon by residential neighborhoods. Relocating this facility to a modern building will increase the units' ability to recruit, train, and maintain equipment and allow for adequate Force Protection. The facilities where the current operations take place was constructed in 1976. Site Code 54A85 Site UID 6099 Cat Code 17180 ISR-I Year 2025 F Q C Local Rating Rating Rating Name 4 3 2 Morgan-Morgan Armory Encroachment surrounding the site has created AT/FP issues on standoff and line of site. No room for expansion of the motor pool area to secure the military vehicles and equipment. The facilities are deficit for space requirement at 15,798 SQFT of 78,875 SQFT or 20% of requirement per NGB PAM 415-12. Due to the lack of space and functional configuration of the space, the facilities are short the following DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 50 === page 73 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Martinsburg Readiness Center; West Virginia 5. PROGRAM ELEMENT RPSUID: 194738 6. CATEGORY CODE NATIONAL GUARD READINESS CENTER ADDITION/ALTERATION 7. PROJECT NUMBER 8. PROJECT COST ($000) 0505896A 17180 540071 Approp 20,000 CURRENT SITUATION: (CONTINUED) functional areas in Administrative, Classroom, Work bays, Vaults, Cranes, Beds, Latrine, Storage, Kitchen and Assembly Hall. Currently, the state of West Virginia has begun the environmental assessment on this project. Hazards include exposure to lead which exceeds 200 micrograms per square foot, overcrowded spaces, lack of environmental climate control for both personnel and equipment. Personnel are exposed to humidity levels which do not meet the US Army Center for Health Promotion and Prevention Medicine of 30-60%, and humidity sensitive. The Martinsburg facility is cost inefficient to heat and provides no cooling. The cost per square foot for heating is the highest in the state among the older buildings. The hot water system uses two non-energy efficient heaters which add considerably to the cost of the facility and degrade reliability. Use of the drill floor for maintenance on vehicles due to lack of training bay increase risk to air quality and building air exchange rates violate safety requirements in OSHA: 1910.94. The site for this project is in possession of the State of West Virginia until 2071. IMPACT IF NOT PROVIDED: If the project is not provided, these units will continue to operate out of an ageing, obsolete facility that does not provide adequate space for operations, unit storage, or organizational parking. Decreases in unit readiness and retention are expected to occur. The current facility continues to be encroached upon by neighborhoods and is land locked making it increasingly cost prohibitive to meet AT/FP requirements without purchasing private residences. The current facility having been designed in 1976 is not energy efficient, which increases the operating and maintenance cost. The lack of existing space to conduct equipment maintenance creates a strain on the 24 mechanics assigned at this location. Inadequate ability to conduct user level maintenance due to the lack of multipurpose training bays or distance to organizational maintenance shops. Lost man-hours due to inefficient space and movement of equipment to other facilities or in and around to make space for maintenance operations and increased equipment backlogs on required maintenance. If this project is not provided units will continue using temporary storage solutions such as in containers that are outside in the elements, presenting increased equipment degradation, maintenance costs/backlog, physical security concerns, time lost moving equipment around. Units continued training in a lack of space degrades ability to conduct home station training and individual Soldier Readiness. Units lose valuable training time conducting training at alternate locations, the closest WVARNG facility will be 82 miles away. Due to the lack of vault space units will have to store their arms at other facilities across the state. Travel time to other locations will decrease the amount of time for training. Training in 20% of the required space reduces the quality and increases safety risk levels. DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 51 === page 74 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Martinsburg Readiness Center; West Virginia 5. PROGRAM ELEMENT RPSUID: 194738 6. CATEGORY CODE NATIONAL GUARD READINESS CENTER ADDITION/ALTERATION 7. PROJECT NUMBER 8. PROJECT COST ($000) 0505896A 17180 540071 Approp 20,000 ADDITIONAL: Sustainable principles, to include life cycle cost effective practices, will be integrated into the design, development and construction of the project and will follow the guidance detailed in the Army Sustainable Design and Development Policy complying with applicable laws and executive orders. PHYSICAL SECURITY: This project has been coordinated with the installation physical security plan, and all physical security measures are included. ANTITERRORISM/FORCE PROTECTION: This project has been coordinated with the installation antiterrorism plan. Risk and threat analyses have been performed in accordance with DA Pam 190-51 and TM 5-853-1, respectively. Protective measures required by regulation and the minimum standards as required by UFC 4- 010-01 (Department of War Minimum Antiterrorism Standards for Buildings) are needed. These requirements are included in the description of construction and cost estimate. ECONOMIC ANALYSIS: Alternative methods of meeting this requirement have been explored during project development. This project is the only feasible option to meet the requirement. JOINT USE CERTIFICATION: The Deputy Assistant Secretary of the Army Installations and Housing certifies that this project has been considered for joint use potential. This facility will not be available for use by other components. Required assessments have been made for supporting facilities and the project is not in a 100-year floodplain in accordance with Executive Order 11988. 12. SUPPLEMENTAL DATA: A. Estimated Execution Data: (1) Acquisition Strategy: Design-bid-build (2) Design Data (a) Design or Request for Proposal(RFP) Started: (b) Percent of Design Completed as of SEP 2025: (c) Percent of Design Completed as of JAN 2026: (d) Design or RFP Complete: (e) Total Design Cost ($000): (f) Energy Study and/or Life Cycle Cost Analysis performed: (g) Standard or Definitive Design Used? (3) Construction Data: (a) Contract Award: (b) Construction Start: (c) Construction Complete: DD FORM 1391C, JUL 1999 PREVIOUS EDITION IS OBSOLETE AUG/2024 35% 65% OCT/2026 2,600 NO NO MAR/2027 MAY/2027 MAR/2029 PAGE NO. 52 === page 75 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Martinsburg Readiness Center; West Virginia 5. PROGRAM ELEMENT RPSUID: 194738 6. CATEGORY CODE NATIONAL GUARD READINESS CENTER ADDITION/ALTERATION 7. PROJECT NUMBER 8. PROJECT COST ($000) 0505896A 17180 540071 Approp 20,000 12. SUPPLEMENTAL DATA (CONTINUED..) B. Equipment associated with this project which will be provided from other appropriations: Fiscal Year Equipment Procuring Appropriated Cost Nomenclature Appropriation Or Requested ($000) F F & E Kitchen Equipment (Type C) ESS Info Sys - ISC Info Sys - PROP Component POC: DD FORM 1391C, JUL 1999 OMNG OMNG OMNG OPA OMNG 2028 2028 2028 2028 2028 1,300 125 54 335 440 ARNG Budget Officer PREVIOUS EDITION IS OBSOLETE PAGE NO. 53 === page 76 === THIS PAGE INTENTIONALLY LEFT BLANK PAGE NO. 54 === page 77 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Minor Construction Worldwide Various Unspecified Minor Construction 5. PROGRAM ELEMENT 6. CATEGORY CODE 0505896A 7. PROJECT NUMBER 8. PROJECT COST ($000) 109735 990022 96200 19,500 Approp 9. COST ESTIMATES 1.0000 U.S. DOLLAR/US$ ITEM PRIMARY FACILITY 00000 Unspecified Minor Construction UM (M/E) QUANTITY LS -- UNIT COST -- COST($000) 19,500 (19,500) SUPPORTING FACILITIES ESTIMATED CONTRACT COST CONTINGENCY (0.00%) SUBTOTAL SUPV, INSP & OVERHEAD (0.00%) TOTAL REQUEST TOTAL FEDERAL REQUEST INSTALLED EQT-OTHER APPROP 19,500 0 19,500 0 19,500 19,500 (0) 10. Description of Proposed Construction Unspecified Minor Military Construction (UMMC) projects which have a funding cost of $9,000,000 or less, including construction, alteration, or conversion of permanent or temporary facilities as authorized under 10 USC 2805. 11. REQ: NONE ADQT: NONE SUBSTD: NONE PROJECT: For Unspecified Minor Military Construction (UMMC) projects REQUIREMENT: This line item is needed to provide for Unspecified Minor Military Construction (UMMC) Program projects for which the need cannot be reasonably foreseen nor justified in time to be included in this Military Construction, Army National Guard Program. CURRENT SITUATION: These unforeseen projects address high priorities such as critical mission requirements, environmental protection, and life, health, or safety threatening conditions. These projects cannot wait until the next budget submission. DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 55 === page 78 === THIS PAGE INTENTIONALLY LEFT BLANK PAGE NO. 56 === page 79 === 1. COMPONENT 2. DATE FY 2027 MILITARY CONSTRUCTION PROJECT DATA APRIL 2026 ARNG 3. INSTALLATION AND LOCATION 4. PROJECT TITLE Design Worldwide Various Design 5. PROGRAM ELEMENT 6. CATEGORY CODE 0505896A 7. PROJECT NUMBER 8. PROJECT COST ($000) 109736 990033 96100 71,909 Approp 9. COST ESTIMATES 1.0000 U.S. DOLLAR/US$ PRIMARY FACILITY 00000 Design ITEM UM (M/E) QUANTITY LS -- UNIT COST -- COST($000) 71,909 (71,909) SUPPORTING FACILITIES ESTIMATED CONTRACT COST CONTINGENCY (0.00%) SUBTOTAL SUPV, INSP & OVERHEAD (0.00%) TOTAL REQUEST TOTAL FEDERAL REQUEST INSTALLED EQT-OTHER APPROP 71,909 0 71,909 0 71,909 71,909 (0) 10. Description of Proposed Construction This item provides for: parametric, concept, and final design of major and unspecified minor construction projects; value engineering; and the development of standards and criteria for ARNG facilities 11. REQ: NONE ADQT: NONE SUBSTD: NONE PROJECT: Design funds. REQUIREMENT: These funds are required to provide Design funds for regular Army National Guard Military Construction (MCNG) and Unspecified Minor Military Construction projects. Included within the design and engineering services is value engineering, and continued development of design criteria and standard designs (conventional functional layouts). This account is dissimilar to any other line item in the Army National Guard MCNG budget in that it is reflective of an operations expense, versus a defined scope of a single construction project. Funds will be used for Architect-Engineer (A-E) contracts, and administrative support functions. These funds are required for accomplishment of final correction, review, reproduction and advertisement of projects in the FY 2027 program, for advancement to final design of projects in FY 2028 and for initiation of design of projects in FY 2029. The funds request for the annual Design requirement includes specially designs based on Army National Guard Criteria and Army regulations. DD FORM 1391, JUL 1999 PREVIOUS EDITION IS OBSOLETE PAGE NO. 57 === page 80 === === page 81 ===