=== page 1 === FISCAL YEAR (FY) 2027 BUDGET ESTIMATES April 2026 CHEMICAL AGENTS AND MUNITIONS DESTRUCTION, DEFENSE i === page 2 === This page is intentionally left blank === page 3 === [OCR text: machine-read from a scanned page; the PDF governs] Appropriation Summary Chemical Agents and Munitions Destruction, Total Department of the Army Grand Total Department Of War Defense UNCLASSIFIED Department Of War FY 2027 President's Budget Exhibit P-1 Total Obligational Authority Apr 2026 DoD Component Summary (Dollars in Thousands) FY 2026 FY 2025 Discretionary FY 2026 PL 119-21 Actuals Enacted Spend Plan FY 2026 Total 772,007 213,282 213,282 772,007 213,282 213,282 772,007 213,282 213,282 Page 1 UNCLASSIFIED === page 4 === [OCR text: machine-read from a scanned page; the PDF governs] Appropriation Summary Chemical Agents and Munitions Destruction, Defense Total Department of the Army Grand Total Department Of War UNCLASSIFIED Department Of War FY 2027 President's Budget Exhibit P-1 Total Obligational Authority DoD Component Summary {Dollars in Thousands) FY 2027 FY 2027 Discretionary Mandatory Request Request FY 2027 Total 55,972 55,972 55,972 55,972 55,972 55,972 UNCLASSIFIED Apr 2026 Page 2 === page 5 === [OCR text: machine-read from a scanned page; the PDF governs] UNCLASSIFIED Department of the Army FY 2027 President's Budget Exhibit P-1 Total Obligational Authority Apr 2026 Army Summary (Dollars in Thousands) FY 2026 FY 2025 Discretionary FY 2026 PL 119-21 Appropriation Summary Actuals Enacted Spend Plan FY 2026 Total Chemical Agents and Munitions Destruction, Defense 772,007 213,282 213,282 772,007 213,282 213,282 Total Department of the Army Page 3 UNCLASSIFIED === page 6 === [OCR text: machine-read from a scanned page; the PDF governs] Appropriation Summary Chemical Agents and Munitions Destruction, Defense Total Department of the Army UNCLASSIFIED Department of the Army FY 2027 President's Budget Exhibit P-1 Total Obligational Authority Army Summary (Dollars in Thousands) FY 2027 FY 2027 Discretionary Mandatory Request Request FY 2027 Total 55,972 55,972 55,972 55,972 UNCLASSIFIED Apr 2026 Page 4 === page 7 === [OCR text: machine-read from a scanned page; the PDF governs] FY 2026 Appropriation: Chemical Agente and Munitions Destruction, Defense Actuals Enacted Budget Activity Ol. Operation and maintenance 17/245 3,243 02. Research, Development, Test, and Evaluation 194,762 210,039 Total Chemical Agents and Munitions Destruction, Defense 772,007 213,282 UNCLASSIFIED Department of the Army FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 0390D Budget Activity Summary (Dollars in Thousands) FY 2025 Discretionary FY 2026 PL 119-21 FY 2026 Total UNCLASSIFIED Apr 2026 Page § === page 8 === [OCR text: machine-read from a scanned page; the PDF governs] UNCLASSIFIED Department of the Army FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 0390D Budget Activity Summary (Dollars in Thousands) FY 2027 FY 2027 Discretionary Mandatory Appropriation: Chemical Agents and Munitions Destruction, Defense Request Request FY 2027 Total Budget Activity Q1. Operation and maintenance 02. Research, Development, Test, and Evaluation 55,972 $5,972 Total Chemical Agents and Munitions Destruction, Defense $5,972 55,972 UNCLASSIFIED Apr 2026 Page 6 === page 9 === [OCR text: machine-read from a scanned page; the PDF governs] UNCLASSIFIED Department of the Army FY 2027 President's Budget Exhibit P-1 Total Obligational Authority Apr 2026 0390D Detail (Dollars in Thousands) Appropriation: 0390 Chemical Agents and FY 2026 Discretionary FY 2026 PL 119-21 Spend Munitions Destruction, Defense FY 2025 Actuals Enacted Plan FY 2026 Total Line Ident No Item Nomenclature Code Sec Qty Cost Qty Cost Oty Cost Qty Cost Budget Activity 01: Operation and maintenance Operation & Maintenance 1 Chem Demilitarization - O&M U 17,245 3,243 3,243 Total Operation and maintenance 17,245 3,243 3,243 Budget Activity 02: Research, Develo nt, Test, and Evaluation RDT&E 2 Chem Demilitarization - RDT&E U 754,762 210,039 210,039 Total Research, Development, Test, and Evaluation 754,762 210,039 210,039 Total Chemical Agents and Munitions Destruction, Defense 772,007 213,282 213,282 Page 7 UNCLASSIFIED === page 10 === [OCR text: machine-read from a scanned page; the PDF governs] UNCLASSIFIED Department of the Army FY 2027 President's Budget Exhibit P-1 Total Obligational Authority 0390D Detail {Dollars in Thousands) Appropriation: 0390 Chemical Agents and FY 2027 Discretionary FY 2027 Mandatory Munitions Destruction, Defense Request Request. FY 2027 Total Line Ident. No Item Nomenclature Code Sec Qty Cost Qty Cost Qty Cost Budget Activity 01: Operation and maintenance Operation & Maintenance 1 Chem Demilitarization - O&M U Total Operation and maintenance Budget Activity 02: Research, Devel: nt, Test, and Evaluation RDTSE 2 Chem Demilitarization - RDT&E U 55,972 55,972 Total Research, Development, Test, and Evaluation 55,972 55,972 Total Chemical Agents and Munitions Destruction, Defense 55,972 55,972 UNCLASSIFIED Apr 2026 Page 8 === page 11 === FISCAL YEAR (FY) 2027 BUDGET ESTIMATES CHEMICAL AGENTS AND MUNITIONS DESTRUCTION, DEFENSE TABLE OF CONTENTS PAGE NO APPROPRIATION LANGUAGE.......................................................... 1 APPROPRIATION JUSTIFICATION..................................................... 2 PART I - PURPOSE AND SCOPE PART II - JUSTIFICATION OF FUNDS REQUIRED PART III - MILESTONES BUDGET ACTIVITY 1: OPERATIONS AND MAINTENANCE ................................. 8 PURPOSE AND SCOPE JUSTIFICATION OF FUNDS REQUIRED JUSTIFICATION BY PROGRAM EXHIBIT OP-5 EXHIBIT OP-32 BUDGET ACTIVITY 2: RESEARCH, DEVELOPMENT, TEST, AND EVALUATION ............... 18 PURPOSE AND SCOPE JUSTIFICATION OF FUNDS REQUIRED FUNDED FINANCIAL SUMMARY JUSTIFICATION BY PROGRAM EXHIBIT R-1 EXHIBIT R-2 === page 12 === CHEMICAL AGENTS AND MUNITIONS DESTRUCTION, DEFENSE APPROPRIATION LANGUAGE Fiscal Year 2027 For expenses not otherwise provided for, necessary for the destruction of the United States stockpile of lethal chemical agents and munitions in accordance with the provisions of Section 1412 of the Department of Defense Authorization Act for Fiscal Year 1986 (50 U.S.C. 1521), $55,972,000 of which: (1) $0 shall be for operations and maintenance for the Chemical Stockpile Emergency Preparedness Program (CSEPP); and (2) $55,972,000 to remain available until September 30, 2027, shall be for research, development, test, and evaluation, and shall only be for the Assembled Chemical Weapons Alternatives (ACWA) Program. 1 === page 13 === JUSTIFICATION OF BUDGET ESTIMATE SUBMISSION CHEMICAL AGENTS AND MUNITIONS DESTRUCTION, DEFENSE APPROPRIATION JUSTIFICATION (In Thousands of Dollars) FY 2027 Estimate $55,972 FY 2026 Request $213,282 FY 2025 Actual $772,007 Part I – Purpose and Scope The Chemical Demilitarization Program is a national program of high significance to the Army, the Departments of War and State, the Administration, the Congress, and the international community. This is a congressionally mandated program. The objective of the Chemical Demilitarization Program is to destroy the United States (U.S.) inventory of lethal chemical agents and munitions and related material, thus avoiding future risks and costs associated with its continued storage; this objective was achieved in July 2023. The Chemical Demilitarization Program supports the international initiatives to rid the world of chemical weapons, as outlined in the Chemical Weapons Convention (CWC). The Chemical Demilitarization Program is this nation’s response to the mandate of public law and commitments under the CWC. The program is established by and subject to the provisions outlined in title 50, United States Code (U.S.C.), Section 1521 (as amended), which mandates that the U.S. chemical weapons stockpile must be destroyed by the deadline established by the CWC and under no circumstances later than December 31, 2023. The United States ratified the CWC on April 25, 1997. The CWC is an international treaty banning development, production, stockpiling and use of chemical weapons. Under the treaty, chemical weapons were to be destroyed by April 29, 2007, with a possible one-time extension until April 29, 2012. The Secretary of Defense notified Congress on April 10, 2006, that the United States would request an extension of the destruction deadline to April 29, 2012. The notification also stated that the United States would not achieve that milestone based on the current schedules, but that the Department of Defense would continue requesting resources needed to complete destruction as close to the 2012 deadline as 2 === page 14 === practicable. A formal request for the extension was presented to the Organization for the Prohibition of Chemical Weapons (OPCW), which is the international organization overseeing implementation of the CWC provisions and approved by OPCW in December 2006. All nations that are party to the CWC must comply with international law and are subject to a stringent inspection regime conducted by the OPCW. The Department’s policy is to safely and efficiently destroy the U.S. lethal chemical stockpile as soon as possible. The Chemical Demilitarization Program previously consisted of two Acquisition Category 1D Major Defense Acquisition Programs (MDAP)–- Chemical Demilitarization-U.S. Army Chemical Materials Activity (CMA) and Chemical Demilitarization-Assembled Chemical Weapons Alternatives (ACWA). Both MDAPs are currently inactive because of completing destruction of the nine chemical weapons stockpiles. The Army has responsibility for oversight and management of CMA with the Director of the CMA providing management of the Chemical Stockpile Elimination (CSE) Project, which was responsible for completing destruction of nearly 90 percent of the U.S. chemical weapons stockpile at seven sites in 2012 and completing facility closure and closure of environmental permits and contracts in 2015; and execution of the Chemical Stockpile Emergency Preparedness Program (CSEPP). In accordance with U.S. law, OSD has direct oversight of the ACWA Program, which is responsible for neutralization destruction facilities in Colorado and Kentucky including the operations and closure phases. With the complete destruction of the declared U.S. chemical weapons stockpile, which occurred in July 2023, the final phase of the Chemical Demilitarization Program is underway, Closure. Closure includes decontamination and decommissioning, followed by demolition. PEO ACWA is nearly complete the decontamination and decommissioning of the destruction facilities, and will begin demolition at both sites in FY 2026. 3 === page 15 === The Chemical Stockpile Emergency Preparedness Program (CSEPP): The CSEPP is a complementary effort to the Assembled Chemical Weapons Alternatives Program to enhance protection of the civilian population during storage and disposal of the U.S. chemical weapons stockpile in Kentucky. CSEPP operations and requirements at the Alabama, Arkansas, Maryland, Indiana, Oregon, Utah, and Colorado locations have been completed with the elimination of the stockpiles at these sites. With the destruction of the U.S. chemical weapons stockpile in Kentucky, the U.S. Army and the Department of Homeland Security/Federal Emergency Management Agency (DHS/FEMA) will complete the closeout of CSEPP. The Army has the responsibility for closing out the on-post portion of CSEPP which will be concluded, and the program terminated by the end of FY 2026 and therefore requires no additional funding after FY 2026. DHS/FEMA has total responsibility and accountability for closing out the off-post portion of CSEPP which will be concluded and the program terminated by the end of FY 2027 using FY 2026 2-Year O&M funding. Therefore, no additional off-post funding is required after FY 2026. The Assembled Chemical Weapons Alternatives (ACWA) Program: The Omnibus Consolidated Appropriation Act for FY 1997 (Public Law 104-208) directed that the Under Secretary of Defense for Acquisition, Technology and Logistics (USD(AT&L)), conduct a program to identify and demonstrate not fewer than two alternatives to the baseline incineration process for the demilitarization of assembled chemical munitions. In 2002, Public Law 107-248 assigned the Program Manager (PM) ACWA the responsibility for the destruction of the chemical weapons stockpiles at the Pueblo Chemical Depot in Colorado and the Blue Grass Army Depot in Kentucky. In June 2011, DoD certified a restructured ACWA program pursuant to title 10, U.S.C., section 2433a. In February 2012, the Program Manager position was changed to a Program Executive Officer position. In March 2012, the ACWA program received Milestone B approval and an approved Acquisition Program Baseline (APB) that reflected revised cost and schedule estimates. In July 2012, permanent orders were signed to re-designate the U.S. Army Element, ACWA to the Program Executive Office (PEO), ACWA effective October 1, 2012. In March 2015, the ACWA program commenced destruction of the remaining 10.25 percent of the U.S. chemical weapons stockpile using the Pueblo Chemical Agent-Destruction Pilot Plant (PCAPP) Explosive Destruction System (EDS) in Colorado. On September 7, 2016, the PCAPP Main Plant commenced destruction operations. On June 7, 2019, the Static Detonation Chamber (SDC) 1200, which was previously referred to as the Explosive Destruction Technology (EDT) for the 4 === page 16 === mustard-filled 155mm projectiles destruction campaign, at Blue Grass Chemical AgentDestruction Pilot Plant (BGCAPP) started operations. On January 17, 2020, the BGCAPP Main Plant started operations. On March 22, 2022, the Milestone Decision Authority signed the Acquisition Decision Memorandum approving a revised APB for PEO ACWA due to numerous fact of life changes that include: changing the processing approach for 67% of the munitions, the addition of two SDCs and changes in waste handling at BGCAPP; the use of the EDS and three SDCs for problematic munitions at PCAPP; and the refinement of the closure methodology for both sites. On February 19, 2022, the PCAPP SDCs began processing mustard-filled mortars. On March 30, 2022, the Anniston SDC began disposing of non-contaminated rocket motors, a secondary waste from processing rockets at BGCAPP, which completed on April 3, 2025. The BGCAPP SDC 2000 which has been operational since Jan. 27, 2023, completed secondary waste disposal of the GB (Sarin) drained containerized rocket warheads (CRW)on August 11,2025. The BGCAPP SDC 1200, which has been operational since Oct. 25, 2023, completed secondary waste disposal of the VX drained CRWs on Sep. 11, 2025. The ACWA Program completed destruction of the remaining U.S. chemical weapons stockpiles at PCAPP and BGCAPP. The PCAPP Main Plant completed destruction on June 16, 2023. The PCAPP SDCs completed destruction on June 22, 2023. The BGCAPP Main Plant completed destruction on July 7, 2023. Both sites are in the closure phase, which is expected to continue into FY 2028 through administrative closure of environmental permits and contracts. Part II - Justification of Funds Required The funds requested in this budget submission are required to carry out the congressional mandate of title 50, U.S.C., section 1521 and the commitments of this nation under the Chemical Weapons Convention (CWC). This document provides justification for FY 2027 financial requirements in support of the Chemical Demilitarization Program, which is budgeted in the Chemical Agents and Munitions Destruction, Defense appropriation. The following paragraphs provide a summary of the activities planned for FY 2027 that require funding. 5 === page 17 === The Chemical Stockpile Emergency Preparedness Program (CSEPP) has completed support of closeout at the Blue Grass Army Depot (BGAD), where chemical weapons were stored, and in the off-post community surrounding the storage facility and therefore requires no funding for FY 2027. The Assembled Chemical Weapons Alternatives (ACWA) program activities at the Pueblo Chemical Agent-Destruction Pilot Plant (PCAPP) will include the following efforts: completion of demolition of the Main Plant, and initiation of final sampling and report development for permit closeout. The ACWA program activities at the Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP) will include the following efforts: completion of demolition at the Main Plant, SDC 1200, and SDC 2000; and initiation of permit and contract closeout at the Main Plant, SDC 1200 and SDC 2000. Part III – Milestones Major Milestone for the Chemical Stockpile Emergency Preparedness Program are as follows: - Completion of closeout at Blue Grass Chemical Activity, Kentucky and CMA CSEPP Support Office - Completion of closeout at Commonwealth of Kentucky - Completion of closeout at Federal Emergency Management Agency CSEPP Support Office 6 FY 2026 FY 2026 FY 2027 === page 18 === Major Milestones for the Assembled Chemical Weapons Alternatives Program are as follows: PCAPP: - Main Plant: Completion of demolition of the Main Plant; and initiation of final sampling and report development for permit closeout FY 2027 BGCAPP: - Main Plant: completion of demolition of the Main Plant; and initiation of permit and contract closeout - BGCAPP SDC 1200: completion of demolition of SDC 1200; and initiation of permit and contract closeout - BGCAPP SDC 2000: completion of demolition of SDC 2000; and initiation of permit and contract closeout 7 FY 2027 FY 2027 FY 2027 === page 19 === BUDGET ACTIVITY 1: OPERATIONS AND MAINTENANCE (In Thousands of Dollars) FY 2027 Estimate $0.00 FY 2026 Request $3,243 FY 2025 Actual $17,245 Purpose and Scope This budget activity requires no funding since closeout activities for the Chemical Stockpile Emergency Preparedness Program (CSEPP) will be completed and the program terminated with FY 2026 funding. Justification of Funds Required No funds are requested in FY 2027 as the Chemical Stockpile Emergency Preparedness Program (CSEPP) will have completed closeout and terminated the program using FY 2026 funding. Justification by Program Chemical Stockpile Emergency Preparedness Program: On-Post Program Management ($0.00K): There is no FY 2027 budget request for this program. On-Post Mission ($0.00K): There is no FY 2027 budget request for this program. Off-Post Mission ($0.00K): There is no FY 2027 budget request for this program. 8 === page 20 === BUDGET ACTIVITY 1: OPERATIONS AND MAINTENANCE 9 === page 21 === BUDGET ACTIVITY 1: OPERATIONS AND MAINTENANCE 10 === page 22 === BUDGET ACTIVITY 1: OPERATIONS AND MAINTENANCE 11 === page 23 === BUDGET ACTIVITY 1: OPERATIONS AND MAINTENANCE 12 === page 24 === BUDGET ACTIVITY 1: OPERATIONS AND MAINTENANCE 13 === page 25 === BUDGET ACTIVITY 1: OPERATIONS AND MAINTENANCE 14 === page 26 === BUDGET ACTIVITY 1: OPERATIONS AND MAINTENANCE 15 === page 27 === BUDGET ACTIVITY 1: OPERATIONS AND MAINTENANCE 16 === page 28 === BUDGET ACTIVITY 1: OPERATIONS AND MAINTENANCE 17 === page 29 === BUDGET ACTIVITY 2: RESEARCH, DEVELOPMENT, TEST AND EVALUATION (In Thousands of Dollars) FY 2027 Estimate $55,972 FY 2026 Request $210,039 FY 2025 Actual $754,762 Purpose and Scope This budget activity provides resources for the design, construction, systemization, operations, and closure of two full-scale pilot plants, PCAPP and BGCAPP, as well as the alternative destruction technologies selected for both sites. The budget activity also provides for the preparation of the necessary environmental permitting documentation to support construction, and operation of the two pilot plants, SDCs, as well as public outreach and other program management activities. Costs for design and construction of pilot plants and SDCs are included in the Chemical Demilitarization Construction, Defense account. Justification of Funds Required The Assembled Chemical Weapons Alternatives (ACWA) program activities at the Pueblo Chemical Agent-Destruction Pilot Plant (PCAPP) will include the following efforts: completion of demolition of the Main Plant; and initiation of final sampling and report development for permit closeout. The ACWA program activities at the Blue Grass Chemical Agent-Destruction Pilot Plant (BGCAPP) will include the following efforts: completion of demolition at the Main Plant, SDC 1200, and SDC 2000; and initiation of permit and contract closeout at the Main Plant, SDC 1200 and SDC 2000. 18 === page 30 === BUDGET ACTIVITY 2: RESEARCH, DEVELOPMENT, TEST AND EVALUATION Funded Financial Summary (In Thousands of Dollars) FY 2025 Actual Assembled Chemical Weapons Alternative Program (ACWA) Program Management 340,999 Pueblo, CO 413,763 Blue Grass, KY 754,762 Total ACWA Funded FY 2026 Request 106,046 103,993 210,039 FY 2027 Estimate 20,317 35,655 55,972 Note: In 1st quarter FY 2026, a reprogramming action for a decrease of $103.622M in FY 2025 RDT&E for the ACWA program was approved and funding was utilized by the Department for higher priorities. The FY 2025 RDT&E funding allocation will be adjusted in the database to reflect the reprogramming prior to the next President’s Budget Request. 19 === page 31 === BUDGET ACTIVITY 2: RESEARCH, DEVELOPMENT, TEST AND EVALUATION Justification by Program A. DESCRIPTION OF ELEMENT: Assembled Chemical Weapons Alternatives (ACWA) Program: This budget activity will fund costs related to design, construction, systemization, operations, and closure of two full-scale pilot plants, PCAPP and BGCAPP, as well as the alternative destruction technologies selected for both sites. The budget activity also provides for the preparation of the necessary environmental permitting documentation to support construction, and operation of the two pilot plants, SDCs, as well as public outreach and other program management activities. Costs for design and construction of pilot plants and SDCs are included in the Chemical Demilitarization Construction, Defense account. B. PROGRAM ACCOMPLISHMENTS AND PLANS: Assembled Chemical Weapons Alternatives (ACWA) Program (See Exhibit R-2, ACWA): PCAPP: FY 2027 budget will fund the following efforts: PCAPP Main Plant – completion of demolition, and initiation of final sampling and report development for permit closeout. BGCAPP: FY 2027 budget will fund the following efforts: BGCAPP Main Plant – completion of demolition and initiation of permit and contract closeout; BGCAPP SDC 1200 completion of demolition and initiation of permit and contract closeout; BGCAPP SDC 2000 completion of demolition and initiation of permit and contract closeout. C. WORK PERFORMED BY: Assembled Chemical Weapons Alternatives (ACWA) Program: 20 === page 32 === BUDGET ACTIVITY 2: RESEARCH, DEVELOPMENT, TEST AND EVALUATION Aberdeen Proving Ground, Maryland, and is the management organization responsible for the implementation of alternatives to the baseline incineration process for the demilitarization of chemical munitions. A contract to design, build, test, systemize, operate, and close a pilot plant based on neutralization followed by bio-treatment at Pueblo Chemical Depot, Colorado was awarded to Bechtel National Incorporated in 2002. Bechtel National Incorporated completed destruction of the remaining U.S. chemical weapons stockpile in Colorado on June 22, 2023. A contract to design, build, test, systemize, operate, and close a pilot plant based on neutralization followed by supercritical water oxidation (SCWO) at Blue Grass Army Depot, Kentucky was awarded to the Bechtel Parsons Joint Venture in 2003. In August 2020, the PEO ACWA decided not to use the SCWO system due to safety and operational concerns. The BGCAPP contract has been modified to support the shipment and ultimate treatment of the neutralized agent by-product at an off-site treatment facility. Bechtel Parsons Joint Venture completed destruction of the remaining U.S. chemical weapons stockpile in Kentucky on July 7, 2023. The Anniston SDC completed disposal of energetics from PCAPP, and on March 30, 2022, began disposing of non-contaminated rocket motors, a secondary waste from processing rockets at BGCAPP, completing this mission on April 3, 2025. The BGCAPP SDC 2000 which has been operational since Jan. 27, 2023, completed secondary waste disposal of the GB (Sarin) drained containerized rocket warheads (CRW)on August 11,2025. The BGCAPP SDC 1200, which has been operational since Oct. 25, 2023, completed secondary waste disposal of the VX drained CRWs on Sep. 11, 2025. D. RELATED ACTIVITIES: Not applicable, since the completion of the declared U.S. chemical weapons stockpile occurred in July 2023. E. OTHER APPROPRIATION FUNDS: Not Applicable. 21 === page 33 === BUDGET ACTIVITY 2: RESEARCH, DEVELOPMENT, TEST AND EVALUATION Notes: (1) For FY 2025, Realignment of funding for the Recovered Chemical Warfare Material (RCWM) Program Support Functions from the Chemical Agents & Munitions Destruction, Defense (CAMD,D) appropriation account to the Office of the Under Secretary of War for Acquisition & Sustainment (OUSD(A&S)) for the management and oversight of the enduring RCWM program support functions in order to maintain these capabilities since the destruction of the U.S. chemical weapons stockpile, through the Assembled Chemical Weapons Alternatives (ACWA) program mission, was completed. (2) In 1st quarter FY 2026, a reprogramming action for a decrease of $103.622M in FY 2025 RDT&E for the ACWA program was approved and funding was utilized by the Department for higher priorities. The reduction to the FY 2025 RDT&E funding allocation will be adjusted in the database to reflect the reprogramming in the database prior to the next President’s Budget Request. 22 === page 34 === BUDGET ACTIVITY 2: RESEARCH, DEVELOPMENT, TEST AND EVALUATION 23 === page 35 === BUDGET ACTIVITY 2: RESEARCH, DEVELOPMENT, TEST AND EVALUATION 24 === page 36 === BUDGET ACTIVITY 2: RESEARCH, DEVELOPMENT, TEST AND EVALUATION 25 === page 37 === BUDGET ACTIVITY 2: RESEARCH, DEVELOPMENT, TEST AND EVALUATION 26 === page 38 === BUDGET ACTIVITY 2: RESEARCH, DEVELOPMENT, TEST AND EVALUATION 27