=== page 1 === DEPARTMENT OF WAR BASE REALIGNMENT AND CLOSURE ARMY Fiscal Year (FY) 2027 Budget Estimates JUSTIFICATION DATA SUBMITTED TO CONGRESS April 2026 === page 2 === DEPARTMENT OF WAR BASE REALIGNMENT AND CLOSURE ARMY Fiscal Year (FY) 2027 Budget Estimates JUSTIFICATION DATA SUBMITTED TO CONGRESS April 2026 The estimated cost of this report for the Department of War is approximately $15,774 for fiscal year 2026. This includes $12,639 in expenses and $3,135 in DoW labor. === page 3 === TABLE OF CONTENTS I. Base Realignment and Closure (BRAC) Overview Page Fiscal Year 2027 1 II. Financial Summary 3 III. BRAC Recommendations Detail -- By State TAB a. Alabama Alabama Army Ammunition Plant (1988) Ft. McClellan (1995) 1 2 b. Arkansas Ft. Chaffee (1991 & 1995) 3 c. California Branch US Disciplinary Barracks Lompoc (1995) Ft. Ord (1991) Oakland Army Base (1995) Riverbank Army Ammunition Plant (2005) Sacramento Army Depot (1991) 4 5 6 7 8 d. Colorado Pueblo Army Depot (1988) 9 e. Connecticut Stratford Army Engine Plant (1995) 10 f. District of Columbia Walter Reed National Military Medical Center (2005) g. Georgia Ft. Gillem (2005) Ft. McPherson (2005) 12 13 h. Illinois Ft. Sheridan (1988) Savanna Army Depot Activity (1995) 14 15 i. Maryland Ft. Meade (1988 & 1995) Ft. Ritchie (1995) 16 17 i 11 === page 4 === j. Massachusetts Army Material Technology Laboratory Watertown (1988) Ft. Devens (1988 & 1991) Sudbury Training Annex (1995) 18 19 20 k. Michigan Detroit Arsenal(1995) 21 l. Mississippi Mississippi Army Ammunition Plant (2005) 22 m. New Jersey Camp Kilmer (1995) Camp Pedricktown (1995) Ft. Monmouth (1993 & 2005) 23 24 25 n. New Mexico Ft. Wingate (1988) 26 o. New York Seneca Army Depot (1995) 27 p. Oregon Umatilla Chemical Depot (1988 & 2005) 28 q. Pennsylvania Letterkenny Army Depot (1991 & 1995) 29 r. Tennessee Defense Distribution Depot Memphis (1995) 30 s. Texas Lone Star Army Ammunition Plant (2005) Red River Army Depot (1995 & 2005) 31 32 t. Utah Defense Distribution Depot Ogden (1995) Tooele Army Depot (1993) 33 34 u. Virginia Army Research Laboratory Woodbridge (1991) Ft. Monroe (2005) Ft. Pickett (1995) Vint Hill Farms (1993) 35 36 37 38 ii === page 5 === v. Multiple States Army Program Management iii 39 === page 6 === FY 2027 BASE REALIGNMENT AND CLOSURE DATA ARMY OVERVIEW The Army has successfully completed the implementation of BRAC 1988, 1991, 1993, 1995 and 2005 rounds. These BRAC rounds were previously resourced through two separate Treasury accounts. To improve the BRAC program’s overall efficiency and effectiveness, Congress established a single Department of War Base Closure Account that became effective 26 December 2013; for fiscal year (FY) 2014. The DoW Base Closure Account serves as the sole source of funds for environmental restoration, property management and disposal, and caretaker costs at closed BRAC installations. The account also covers costs associated with supervision, inspection, overhead, engineering and design, and claims related to military construction projects undertaken before 30 September 2014. Finally, the account is available to record, adjust and liquidate obligations properly chargeable to closed DoW Base Closure Accounts. This FY 2027 budget submission represents the costs and savings of implementing all previous BRAC rounds; and the costs to continue caretaking functions and environmental restoration at the remaining BRAC properties through FY 2027. The Army continues to cleanup properties to support property disposal as quickly as available resources allow and remains committed to protecting both human health and our environment. I. Fiscal Year 2027: A. MAJOR EVENTS SCHEDULE. 1. Environmental. The majority of the budget request in FY 2027 is for environmental restoration. The program focuses on protecting human health and the environment through execution of projects that result in transferring acreage and achieving goals for remedy in place/response complete (RIP/RC). In addition to achieving program goals and objectives, these projects seek to provide beneficial reuse of property, and meet legally enforceable requirements. 2. Operation & Maintenance. The Army will fund all caretaking functions at remaining BRAC properties from the consolidated DoW Base Closure Account. These functions include minimum maintenance, utilities, and security at remaining BRAC installations necessary to Exhibit BC-01 BRAC Service Overview 1 === page 7 === FY 2027 BASE REALIGNMENT AND CLOSURE DATA ARMY OVERVIEW protect life, safety and health until properties are conveyed. 3. Revenues from Land Sales. The Army does not expect to receive land sales or revenues to offset the FY 2027 budget request. 4. Prior Year Financing. The Army does not expect to have prior year funding to offset the FY 2027 budget request. B. APPROPRIATION REQUEST FY 2027 ($M): BRAC CONTINUING ENVIRONMENTAL AND CARETAKER COSTS: ARMY FY 2027 Environmental Operation and Maintenance 131.881 19.412 Total Obligation Authority Revenues From Land Sales (-) Prior Year Financing Budget Authority Request 151.293 0.000 0.000 151.293 C. MISSION IMPACTS. Planned actions will have no adverse impact on the missions of affected organizations. D. CONJUNCTIVELY FUNDED PROJECTS. None. Exhibit BC-01 BRAC Service Overview 2 === page 8 === Base Realignment and Closure Account - 1988 Financial Summary Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Overall Summary 3 FY 1990 FY 1991 FY 1992 FY 1993 FY 1994 FY 1995 FY 1990-1995 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation and Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs 121.619 0.000 0.000 0.000 38.566 0.000 8.925 0.000 169.110 137.511 0.000 0.051 166.610 80.348 0.000 13.251 0.000 397.771 183.375 0.000 0.490 185.215 35.117 0.000 3.330 0.000 407.527 122.060 0.000 0.000 100.453 31.047 0.000 12.691 0.000 266.251 12.830 0.000 0.000 0.000 0.000 0.000 0.000 0.000 12.830 0.000 0.000 0.000 88.830 0.000 0.000 0.000 0.000 88.830 577.395 0.000 0.541 541.108 185.078 0.000 38.197 0.000 1,342.319 Revenues From Land Sales (-) Budget Authority Request (4.337) 164.773 (4.159) 393.612 (40.597) 366.930 (12.680) 253.571 0.000 12.830 (3.940) 84.890 (65.713) 1,276.606 One-Time Costs Funded Outside of the Account Military Construction Family Housing - Construction - Operations Environmental Operation and Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 16.675 0.000 0.000 0.066 16.741 0.000 0.000 0.000 0.000 0.040 0.000 0.054 0.094 0.000 0.000 0.000 0.000 1.915 0.000 0.032 1.947 0.000 0.000 0.000 0.000 1.489 0.000 0.018 1.507 0.000 0.000 0.000 0.000 22.727 0.000 0.007 22.734 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 16.675 26.171 0.000 0.177 43.023 Grand Total One-Time Implementation Costs 181.514 393.706 368.877 255.078 35.564 84.890 1,319.629 Exhibit BC-02 BRAC Implementation Cost and Savings === page 9 === Base Realignment and Closure Account - 1988 Financial Summary Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Overall Summary One-Time Savings Military Construction Family Housing - Construction - Operations Operation and Maintenance Military Personnel - PCS Other Total One-Time Savings 4 FY 1990 FY 1991 FY 1992 FY 1993 FY 1994 FY 1995 FY 1990-1995 9.200 0.000 0.000 1.556 (0.538) 0.000 10.218 15.300 0.000 15.033 3.576 0.868 0.000 34.777 19.300 0.000 17.257 4.341 15.403 0.000 56.301 19.400 0.000 18.683 20.735 60.969 0.000 119.787 19.400 0.000 44.259 89.312 87.346 0.000 240.317 19.400 0.000 40.137 122.403 77.671 0.000 259.611 102.000 0.000 135.369 241.923 241.719 0.000 721.011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total Savings 10.218 34.777 56.301 119.787 240.317 259.611 721.011 0 0 (20) (145) (27) (975) (1,474) (1,644) (2,845) (2,075) (3,371) (2,201) (3,371) (2,201) 171.296 358.929 312.576 135.291 (204.753) (174.721) 598.618 Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues Exhibit BC-02 BRAC Implementation Cost and Savings === page 10 === Base Realignment and Closure Account - 1991 Financial Summary Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Overall Summary 5 FY 1992 FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1992-1997 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation and Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs 23.600 0.000 0.000 35.650 0.050 0.000 0.000 0.000 59.300 140.979 0.000 0.934 53.099 146.427 0.000 17.382 0.000 358.821 264.444 0.000 0.334 69.031 56.412 0.000 1.303 0.000 391.524 97.985 0.000 0.000 54.095 23.323 0.000 2.798 0.000 178.201 31.640 0.000 0.081 236.494 53.842 0.000 40.840 0.000 362.897 0.000 0.000 0.000 3.804 3.388 0.000 10.590 0.000 17.782 558.648 0.000 1.349 452.173 283.442 0.000 72.913 0.000 1,368.525 Revenues From Land Sales (-) Budget Authority Request 0.000 59.300 0.000 358.821 (0.057) 391.467 (0.162) 178.039 (4.824) 358.073 (17.549) 0.233 (22.592) 1,345.933 One-Time Costs Funded Outside of the Account Military Construction Family Housing - Construction - Operations Environmental Operation and Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 7.477 0.000 0.000 0.000 44.728 4.139 0.125 56.469 0.000 0.000 0.160 0.000 11.559 0.000 0.186 11.905 0.000 0.000 0.000 0.000 20.713 0.000 0.454 21.167 0.000 0.000 0.000 0.000 1.041 0.890 0.947 2.878 0.000 0.000 0.000 0.000 9.009 0.000 2.300 11.309 0.000 0.000 0.000 0.000 0.728 0.000 2.300 3.028 7.477 0.000 0.160 0.000 87.778 5.029 6.312 106.756 Grand Total One-Time Implementation Costs 115.769 370.726 412.634 180.917 369.382 3.261 1,452.689 Exhibit BC-02 BRAC Implementation Cost and Savings === page 11 === Base Realignment and Closure Account - 1991 Financial Summary Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Overall Summary One-Time Savings Military Construction Family Housing - Construction - Operations Operation and Maintenance Military Personnel - PCS Other Total One-Time Savings 6 FY 1992 FY 1993 FY 1994 FY 1995 FY 1996 FY 1997 FY 1992-1997 0.000 0.000 0.000 55.068 0.000 0.000 55.068 0.000 0.000 0.000 105.463 0.000 0.000 105.463 0.000 0.000 0.000 198.934 0.000 0.000 198.934 0.000 0.000 0.000 241.312 0.000 0.000 241.312 0.000 0.000 0.000 276.599 0.000 0.000 276.599 0.000 0.000 2.080 301.745 0.000 0.000 303.825 0.000 0.000 2.080 1,179.121 0.000 0.000 1,181.201 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total Savings 55.068 105.463 198.934 241.312 276.599 303.825 1,181.201 Civilian ES Military ES (1,357) 0 (2,296) 0 (418) 0 (4,704) 0 (5,317) 0 (5,648) 0 (5,648) 0 Net Implementation Costs Less Estimated Land Revenues 60.701 265.263 213.700 (60.395) 92.783 (300.564) 271.488 Exhibit BC-02 BRAC Implementation Cost and Savings === page 12 === Base Realignment and Closure Account - 1993 Financial Summary Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Overall Summary 7 FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999 FY 1994-1999 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation and Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs 11.751 0.000 0.000 11.070 11.170 0.000 2.416 0.000 36.407 63.368 0.000 0.000 17.245 42.929 0.000 6.181 0.000 129.723 12.898 0.000 0.000 25.337 24.248 0.000 5.802 0.000 68.285 0.000 0.000 0.000 16.492 9.463 0.000 0.000 0.000 25.955 2.983 0.000 0.000 15.278 0.423 0.000 0.079 0.000 18.763 0.000 0.000 0.000 5.819 0.000 0.000 0.000 0.000 5.819 91.000 0.000 0.000 91.241 88.233 0.000 14.478 0.000 284.952 Revenues From Land Sales (-) Budget Authority Request 0.000 36.407 (0.715) 129.008 0.000 68.285 0.000 25.955 (0.046) 18.717 (0.037) 5.782 (0.798) 284.154 One-Time Costs Funded Outside of the Account Military Construction Family Housing - Construction - Operations Environmental Operation and Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 11.059 0.000 0.014 11.073 0.000 0.000 0.000 0.000 1.069 2.113 0.000 3.182 0.000 0.000 0.000 0.000 2.676 0.384 0.000 3.060 0.000 0.000 0.000 0.000 4.959 0.919 0.000 5.878 0.000 0.000 0.000 0.000 2.597 0.061 0.000 2.658 0.000 0.000 0.000 0.000 0.229 0.000 0.000 0.229 0.000 0.000 0.000 0.000 22.589 3.477 0.014 26.080 Grand Total One-Time Implementation Costs 47.480 132.190 71.345 31.833 21.375 6.011 310.234 Exhibit BC-02 BRAC Implementation Cost and Savings === page 13 === Base Realignment and Closure Account - 1993 Financial Summary Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Overall Summary One-Time Savings Military Construction Family Housing - Construction - Operations Operation and Maintenance Military Personnel - PCS Other Total One-Time Savings 8 Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 FY 1999 FY 1994-1999 12.750 0.000 (1.282) (0.572) 0.000 0.000 10.896 0.000 0.000 (5.280) 3.684 0.000 0.000 (1.596) 0.000 0.000 0.000 19.902 0.000 0.418 20.320 0.000 0.000 0.000 47.739 0.000 0.790 48.529 0.000 0.000 0.409 59.677 0.000 0.930 61.016 0.000 0.000 1.668 64.565 0.000 1.494 67.727 12.750 0.000 (4.485) 194.995 0.000 3.632 206.892 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 10.896 (1.596) 20.320 48.529 61.016 67.727 206.892 0 0 (136) 0 (28) 0 (86) 0 (1,091) 0 (1,113) 0 (1,113) 0 36.584 133.786 51.025 (16.696) (39.641) (61.716) 103.342 Exhibit BC-02 BRAC Implementation Cost and Savings === page 14 === Base Realignment and Closure Account - 1995 Financial Summary Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Overall Summary 9 FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 84.631 0.000 0.000 59.062 80.920 0.000 6.023 0.000 230.636 0.000 0.000 230.636 255.162 0.489 0.001 60.944 116.451 0.000 5.916 0.000 438.963 0.000 0.000 438.963 90.973 0.000 0.390 196.308 113.588 0.000 8.118 0.000 409.377 0.000 (16.605) 392.772 28.360 2.008 0.256 314.180 153.529 0.000 3.666 0.000 501.999 0.000 (16.124) 485.875 39.260 0.000 0.000 107.258 24.770 0.000 0.000 0.000 171.288 0.771 (21.360) 150.699 0.000 0.000 0.000 257.437 24.367 0.000 0.000 0.000 281.804 6.373 0.000 288.177 498.386 2.497 0.647 995.189 513.625 0.000 23.723 0.000 2,034.068 7.144 (54.089) 1,987.123 One-Time Costs Funded Outside of the Account Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 17.413 0.000 0.000 17.413 0.000 0.000 0.000 0.000 16.343 0.000 0.000 16.343 0.000 0.000 0.000 0.000 21.397 0.000 0.000 21.397 0.000 0.000 0.000 0.000 2.690 0.000 0.000 2.690 0.000 0.000 0.000 0.000 2.163 0.000 0.000 2.163 0.000 0.000 0.000 0.000 2.092 0.000 0.000 2.092 0.000 0.000 0.000 0.000 62.098 0.000 0.000 62.098 Grand Total One-Time Implementation Costs 248.049 455.306 414.169 488.565 152.862 290.269 2,049.221 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request Exhibit BC-02 BRAC Implementation Cost and Savings === page 15 === Base Realignment and Closure Account - 1995 Financial Summary Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Overall Summary One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings 10 FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 19.910 0.000 0.000 19.910 0.000 0.000 0.230 28.297 0.000 0.000 28.527 0.000 0.000 2.716 135.646 0.000 0.000 138.362 0.000 0.000 4.184 194.694 0.000 0.000 198.878 0.000 0.000 6.943 273.658 0.000 0.000 280.601 0.000 0.000 7.666 304.947 0.000 0.000 312.613 0.000 0.000 21.739 957.152 0.000 0.000 978.891 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total Savings 19.910 28.527 138.362 198.878 280.601 312.613 978.891 62 0 2,434 2 4,431 5 4,919 5 5,269 5 6,330 5 6,330 5 228.139 426.780 275.807 289.687 (127.739) (22.344) 1,070.330 Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues Exhibit BC-02 BRAC Implementation Cost and Savings === page 16 === Base Realignment and Closure Account - 2005 Financial Summary Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Overall Summary 11 FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2006-2011 788.147 0.000 0.000 38.522 45.461 0.000 0.752 0.000 872.882 0.000 0.000 872.882 3,358.050 0.000 0.000 16.111 192.882 0.000 39.092 0.000 3,606.135 0.000 0.000 3,606.135 3,655.970 0.000 0.000 17.668 216.632 0.000 97.459 0.000 3,987.729 0.000 0.000 3,987.729 3,772.211 0.000 0.000 39.831 316.152 0.000 195.785 0.000 4,323.979 0.000 0.000 4,323.979 1,901.964 0.000 0.000 147.693 1,462.676 0.000 436.714 0.000 3,949.047 0.000 0.000 3,949.047 0.000 0.000 0.000 71.940 887.231 0.000 51.678 0.000 1,010.849 0.000 0.000 1,010.849 13,476.342 0.000 0.000 331.765 3,121.034 0.000 821.480 0.000 17,750.621 0.000 0.000 17,750.621 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 145.152 0.000 0.000 145.152 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 145.152 0.000 0.000 145.152 Grand Total One-Time Implementation Costs 872.882 3,606.135 3,987.729 4,469.131 3,949.047 1,010.849 17,895.773 0.000 0.000 0.000 0.000 0.152 0.000 0.000 0.152 247.209 31.942 5.377 284.528 502.680 117.840 8.894 629.415 704.053 160.839 29.691 894.584 808.716 196.070 33.831 1,038.618 2,262.811 506.692 77.793 2,847.297 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request Recurring Costs (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs (memo non-add) Exhibit BC-02 BRAC Implementation Cost and Savings === page 17 === Base Realignment and Closure Account - 2005 Financial Summary Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Overall Summary One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings 12 Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 48.152 0.000 0.000 0.000 11.233 0.000 59.385 0.000 0.000 0.000 0.000 23.617 4.269 27.886 0.000 0.000 0.000 0.000 17.385 37.079 54.464 0.000 0.000 0.000 0.000 7.244 37.594 44.838 0.000 0.000 0.000 0.000 12.365 17.087 29.452 48.152 0.000 0.000 0.000 71.844 96.029 216.025 0.000 0.000 25.543 93.821 246.412 344.308 710.084 0.000 0.000 0.000 0.000 0.000 0.000 15.354 31.673 30.575 69.954 173.578 68.044 159.443 444.790 116.709 198.183 589.660 138.329 442.935 1,239.700 353.658 0.000 0.000 0.000 0.000 0.000 0.000 0.186 0.000 0.000 29.486 37.270 32.260 0.000 91.012 55.915 170.379 1.963 114.821 78.007 222.386 2.902 129.419 81.561 255.960 4.865 364.738 252.940 680.985 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.186 31.389 5.922 3.124 242.596 39.909 15.593 44.938 823.142 48.453 28.109 92.236 1,553.330 56.356 40.125 127.466 1,964.270 176.107 89.749 267.764 4,583.525 0.000 59.571 270.482 877.607 1,598.168 1,993.722 4,799.550 0 0 49 60 (400) (812) (1,042) (3,496) (378) (1,900) (2,133) (2,020) (3,904) (8,168) 872.882 3,546.564 3,717.247 3,591.524 2,350.879 (982.873) 13,096.223 Exhibit BC-02 BRAC Implementation Cost and Savings === page 18 === FY 2027 Budget Estimates Base Realignment and Closure Account Financial Summary Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Overall Summary BRAC Continuing Environmental and Caretaker Costs ARMY Environmental Operation & Maintenance FY 2025 228.031 14.047 FY 2026 172.169 14.701 FY 2027 131.881 19.412 FY 2025-2027 532.081 48.160 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 242.078 0.000 0.000 242.078 186.870 0.000 0.000 186.870 151.293 0.000 0.000 151.293 580.241 0.000 0.000 580.241 Exhibit BC-04 === page 19 === TAB 1 === page 20 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Alabama Army Ammunition Plant, AL (1988) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request 0.000 0.000 0.000 2.351 0.097 0.000 0.000 0.000 2.448 0.000 0.000 2.448 0.000 0.000 0.000 1.131 0.083 0.000 0.000 0.000 1.214 0.000 0.000 1.214 0.000 0.000 0.000 35.436 0.174 0.000 0.000 0.000 35.610 0.000 (8.577) 27.033 0.000 0.000 0.000 94.446 0.353 0.000 0.000 0.000 94.799 0.000 (6.239) 88.560 0.000 0.000 0.000 23.241 0.061 0.000 0.000 0.000 23.302 0.000 (0.963) 22.339 0.000 0.000 0.000 86.225 0.348 0.000 0.000 0.000 86.573 0.000 0.000 86.573 0.000 0.000 0.000 242.830 1.116 0.000 0.000 0.000 243.946 0.000 (15.779) 228.167 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 2.448 1.214 27.033 88.560 22.339 86.573 228.167 Exhibit BC-02 BRAC Implementation Cost and Savings === page 21 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Alabama Army Ammunition Plant, AL (1988) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.448 1.214 27.033 88.560 22.339 86.573 228.167 Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues Exhibit BC-02 BRAC Implementation Cost and Savings === page 22 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Alabama Army Ammunition Plant, AL (1988) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 2.544 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 2.544 0.000 0.000 2.544 2.617 0.000 0.000 2.617 3.017 0.000 0.000 3.017 8.178 0.000 0.000 8.178 2.617 0.000 3.017 0.000 8.178 0.000 Exhibit BC-04 === page 23 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: (1988) Closure Package: Army/Alabama/Alabama Army Ammunition Plant Closure of Alabama Army Ammunition Plant, AL. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $3.017 million. Caretaker: None. Exhibit BC-03 === page 24 === TAB 2 === page 25 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. McClellan, AL (1995) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues from Land Sales (-) Budget Authority Request 0.000 0.000 0.000 4.064 0.758 0.000 0.000 0.000 4.822 0.000 0.000 4.822 197.413 0.489 0.000 4.261 0.713 0.000 0.000 0.000 202.876 0.000 0.000 202.876 28.311 0.000 0.000 13.281 15.327 0.000 1.759 0.000 58.678 0.000 0.000 58.678 5.511 0.000 0.000 39.507 33.377 0.000 1.151 0.000 79.546 0.000 0.000 79.546 15.196 0.000 0.000 19.223 0.966 0.000 0.000 0.000 35.385 0.000 (0.460) 34.925 0.000 0.000 0.000 17.036 0.205 0.000 0.000 0.000 17.241 0.000 0.000 17.241 246.431 0.489 0.000 97.372 51.346 0.000 2.910 0.000 398.548 0.000 (0.460) 398.088 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 4.822 202.876 58.678 79.546 34.925 17.241 398.088 Exhibit BC-02 BRAC Implementation Cost and Savings === page 26 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. McClellan, AL (1995) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.488 22.107 0.000 0.000 24.595 0.000 0.000 2.546 28.947 0.000 0.000 31.493 0.000 0.000 5.034 51.054 0.000 0.000 56.088 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 24.595 31.493 56.088 0 0 0 0 316 0 316 0 316 0 316 0 316 0 4.822 202.876 58.678 79.546 10.330 (14.252) 342.000 Exhibit BC-02 BRAC Implementation Cost and Savings === page 27 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Ft. McClellan, AL (1995) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 1.075 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 1.075 0.000 0.000 1.075 6.839 0.000 0.000 6.839 10.148 0.000 0.000 10.148 18.062 0.000 0.000 18.062 6.839 0.000 10.148 0.000 18.062 0.000 Exhibit BC-04 === page 28 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Army/Alabama/Ft. McClellan (1995) Closure Package: Closure of Fort McClellan, AL except minimum essential land and facilities for a Reserve Component enclave and minimum essential facilities, as necessary, to provide auxiliary support to the chemical demilitarization operation at Anniston Army Depot, AL. Relocate the U.S. Army Chemical and Military Police Schools to Fort Leonard Wood, MO upon receipt of the required permits. Relocate the Defense Polygraph Institute (DODPI) to Fort Jackson, SC. License Pelham Range and current Guard facilities to the Alabama Army National Guard. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Exhibit BC-03 === page 29 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Continuing Environmental and Caretaker Costs: Environmental: Long term monitoring of environmental sites is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $10.148 million. Caretaker: None. Exhibit BC-03 === page 30 === TAB 3 === page 31 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. Chaffee, AR (1991 & 1995) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues from Land Sales (-) Budget Authority Request FY 2001 FY 1996-2001 0.000 0.000 0.000 3.291 2.758 0.000 0.000 0.000 6.049 0.000 0.000 6.049 0.000 0.000 0.000 4.271 1.190 0.000 0.000 0.000 5.461 0.000 0.000 5.461 0.000 0.000 0.000 5.842 1.858 0.000 0.120 0.000 7.820 0.000 0.000 7.820 0.000 0.000 0.000 9.076 0.242 0.000 0.000 0.000 9.318 0.000 0.000 9.318 0.000 0.000 0.000 1.852 0.000 0.000 0.000 0.000 1.852 0.000 0.000 1.852 0.000 0.000 0.000 1.865 0.238 0.000 0.000 0.000 2.103 0.000 0.000 2.103 0.000 0.000 0.000 26.197 6.286 0.000 0.120 0.000 32.603 0.000 0.000 32.603 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 6.049 5.461 7.820 9.318 1.852 2.103 32.603 Exhibit BC-02 BRAC Implementation Cost and Savings === page 32 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. Chaffee, AR (1991 & 1995) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.851 0.000 0.000 1.851 0.000 0.000 0.000 (2.240) 0.000 0.000 (2.240) 0.000 0.000 0.000 (1.708) 0.000 0.000 (1.708) 0.000 0.000 0.000 1.588 0.000 0.000 1.588 0.000 0.000 0.000 (0.509) 0.000 0.000 (0.509) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total Savings 0.000 0.000 1.851 (2.240) (1.708) 1.588 (0.509) 0 0 0 0 0 0 191 0 191 0 191 0 191 0 6.049 5.461 5.969 11.558 3.560 0.515 33.112 Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues Exhibit BC-02 BRAC Implementation Cost and Savings === page 33 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Ft. Chaffee, AR (1991 & 1995) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 0.442 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 0.442 0.000 0.000 0.442 8.121 0.000 0.000 8.121 0.357 0.000 0.000 0.357 8.920 0.000 0.000 8.920 8.121 0.000 0.357 0.000 8.920 0.000 Exhibit BC-04 === page 34 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Army/Arkansas/Ft. Chaffee (1991 & 1995) Closure/Realignment Package: BRAC 91: Realign Fort Chaffee, AR to its semi-active status with an Active Component garrison to be used in support of Reserve Component training. Realign the Joint Readiness Training Center to Fort Polk, LA. BRAC 95: Change BRAC 91 realignment recommendation to close Fort Chaffee, AR and form a Reserve Component garrison to support training. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Exhibit BC-03 === page 35 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Continuing Environmental and Caretaker Costs: Environmental: Long term monitoring of environmental sites is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $0.357 million. Caretaker: None. Exhibit BC-03 === page 36 === TAB 4 === page 37 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Branch US Disciplinary Barracks, Lompoc, CA (1995) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request FY 2001 FY 1996-2001 0.000 0.000 0.000 2.154 0.204 0.000 0.000 0.000 2.358 0.000 0.000 2.358 0.000 0.000 0.000 6.318 0.168 0.000 0.000 0.000 6.486 0.000 0.000 6.486 11.943 0.000 0.390 3.365 0.420 0.000 0.026 0.000 16.144 0.000 0.000 16.144 0.000 0.000 0.256 5.277 0.715 0.000 0.101 0.000 6.349 0.000 0.000 6.349 0.000 0.000 0.000 5.177 0.025 0.000 0.000 0.000 5.202 0.000 0.000 5.202 0.000 0.000 0.000 4.017 0.207 0.000 0.000 0.000 4.224 0.000 0.000 4.224 11.943 0.000 0.646 26.308 1.739 0.000 0.127 0.000 40.763 0.000 0.000 40.763 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.049 0.000 0.000 0.049 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.049 0.000 0.000 0.049 Grand Total One-Time Implementation Costs 2.358 6.535 16.144 6.349 5.202 4.224 40.812 Exhibit BC-02 BRAC Implementation Cost and Savings === page 38 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Branch US Disciplinary Barracks, Lompoc, CA (1995) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.039 0.000 0.000 0.039 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.759 0.059 0.000 0.000 0.818 0.000 0.000 1.519 1.997 0.000 0.000 3.516 0.000 0.000 1.519 0.478 0.000 0.000 1.997 0.000 0.000 1.519 0.478 0.000 0.000 1.997 0.000 0.000 5.316 3.051 0.000 0.000 8.367 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.039 0.000 0.818 3.516 1.997 1.997 8.367 0 0 0 0 0 0 8 0 8 0 8 0 8 0 2.319 6.535 15.326 2.833 3.205 2.227 32.445 Exhibit BC-02 BRAC Implementation Cost and Savings === page 39 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Branch US Disciplinary Barracks, Lompoc, CA (1995) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 0.117 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 0.117 0.000 0.000 0.117 0.011 0.000 0.000 0.011 0.096 0.000 0.000 0.096 0.224 0.000 0.000 0.224 0.011 0.000 0.096 0.000 0.224 0.000 Exhibit BC-04 === page 40 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Barracks Lompoc (1995) Army/California/Branch US Disciplinary Closure Package: Close Branch US Disciplinary Barracks (USDB), Lompoc, CA. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring of environmental sites is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $0.096 million. Caretaker: None. Exhibit BC-03 === page 41 === TAB 5 === page 42 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. Ord, CA (1991) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues from Land Sales (-) Budget Authority Request 0.000 0.000 0.000 3.407 0.000 0.000 0.000 0.000 3.407 0.000 0.000 3.407 0.000 0.000 0.000 0.935 0.000 0.000 0.000 0.000 0.935 0.000 0.000 0.935 0.000 0.000 0.000 37.604 0.000 0.000 0.000 0.000 37.604 0.000 (3.964) 33.640 0.000 0.000 0.000 60.616 0.872 0.000 0.000 0.000 61.488 0.000 (2.800) 58.688 0.000 0.000 0.000 17.359 0.000 0.000 0.000 0.000 17.359 0.000 (1.128) 16.231 0.000 0.000 0.000 57.096 0.723 0.000 0.000 0.000 57.819 0.000 0.000 57.819 0.000 0.000 0.000 177.017 1.595 0.000 0.000 0.000 178.612 0.000 (7.892) 170.720 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 3.407 0.935 33.640 58.688 16.231 57.819 170.720 Exhibit BC-02 BRAC Implementation Cost and Savings === page 43 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. Ord, CA (1991) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.407 0.935 33.640 58.688 16.231 57.819 170.720 Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues Exhibit BC-02 BRAC Implementation Cost and Savings === page 44 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Ft. Ord, CA (1991) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 35.147 0.465 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 35.612 0.000 0.000 35.612 20.961 0.000 0.000 20.961 15.796 0.000 0.000 15.796 72.369 0.000 0.000 72.369 20.460 0.501 15.187 0.609 70.794 1.575 Exhibit BC-04 === page 45 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Army/California/Ft. Ord (1991) Closure Package: Close Fort Ord, CA, and relocate the 1st Brigade, 7th Infantry Division (Light) from Fort Ord, CA to Fort Lewis, WA. Deactivate the remainder of the division. Retain facilities to support a reserve center and the Defense Language Institute. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Exhibit BC-03 === page 46 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $15.187 million. Caretaker: These funds are for routine maintenance, repair, and utility requirements. Caretaker functions will continue until properties are conveyed. The FY 2027 budget estimate is $0.609 million. Exhibit BC-03 === page 47 === TAB 6 === page 48 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Oakland Army Base, CA (1995) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request FY 2001 FY 1996-2001 0.000 0.000 0.000 1.123 1.255 0.000 0.000 0.000 2.378 0.000 0.000 2.378 0.000 0.000 0.000 0.700 1.561 0.000 0.000 0.000 2.261 0.000 0.000 2.261 2.928 0.000 0.000 10.991 2.422 0.000 0.000 0.000 16.341 0.000 0.000 16.341 0.000 0.000 0.000 1.510 6.391 0.000 0.000 0.000 7.901 0.000 0.000 7.901 0.000 0.000 0.000 0.341 0.000 0.000 0.000 0.000 0.341 0.000 0.000 0.341 0.000 0.000 0.000 1.661 0.000 0.000 0.000 0.000 1.661 0.000 0.000 1.661 2.928 0.000 0.000 16.326 11.629 0.000 0.000 0.000 30.883 0.000 0.000 30.883 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 2.378 2.261 16.341 7.901 0.341 1.661 30.883 Exhibit BC-02 BRAC Implementation Cost and Savings === page 49 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Oakland Army Base, CA (1995) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.287 0.000 0.000 5.287 0.000 0.000 0.000 7.896 0.000 0.000 7.896 0.000 0.000 0.000 10.504 0.000 0.000 10.504 0.000 0.000 0.000 10.504 0.000 0.000 10.504 0.000 0.000 0.000 34.191 0.000 0.000 34.191 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.287 7.896 10.504 10.504 34.191 0 0 113 0 113 0 113 0 113 0 113 0 113 0 2.378 2.261 11.054 0.005 (10.163) (8.843) (3.308) Exhibit BC-02 BRAC Implementation Cost and Savings === page 50 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Oakland Army Base, CA (1995) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 0.035 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 0.035 0.000 0.000 0.035 0.120 0.000 0.000 0.120 0.277 0.000 0.000 0.277 0.432 0.000 0.000 0.432 0.120 0.000 0.277 0.000 0.432 0.000 Exhibit BC-04 === page 51 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Army/California/Oakland Army Base (1995) Closure Package: Closure of Oakland Army Base, CA. Relocate Military Traffic Management Command - Western Area Command Headquarters to form a new Deployment Support Command at Fort Eustis, VA. Relocate the 1302nd Major Port Command (now called the 834th US Army Transportation Battalion) to Naval Weapons Station-Concord, CA. Enclave Army Reserve elements. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: None. None. Other: None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Exhibit BC-03 === page 52 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Continuing Environmental and Caretaker Costs: Environmental: Long term monitoring of environmental sites is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $0.277 million. Caretaker: None. Exhibit BC-03 === page 53 === TAB 7 === page 54 === FY 2027 Budget Estimates Base Realignment and Closure Account - 2005 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Riverbank Army Ammunition Plant, CA (2005) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request FY 2011 FY 2006-2011 0.000 0.000 0.000 1.458 3.786 0.000 0.000 0.000 5.244 0.000 0.000 5.244 0.000 0.000 0.000 0.753 1.748 0.000 14.732 0.000 17.233 0.000 0.000 17.233 24.821 0.000 0.000 0.429 11.209 0.000 40.291 0.000 76.750 0.000 0.000 76.750 0.000 0.000 0.000 1.305 0.000 0.000 16.300 0.000 17.605 0.000 0.000 17.605 0.000 0.000 0.000 1.688 1.198 0.000 4.641 0.000 7.527 0.000 0.000 7.527 0.000 0.000 0.000 20.279 3.568 0.000 0.000 0.000 23.847 0.000 0.000 23.847 24.821 0.000 0.000 25.912 21.509 0.000 75.964 0.000 148.206 0.000 0.000 148.206 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.866 0.000 0.000 0.866 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.866 0.000 0.000 0.866 Grand Total One-Time Implementation Costs 5.244 17.233 76.750 18.471 7.527 23.847 149.072 Recurring Costs (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs (memo non-add) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Exhibit BC-02 BRAC Implementation Cost and Savings === page 55 === FY 2027 Budget Estimates Base Realignment and Closure Account - 2005 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Riverbank Army Ammunition Plant, CA (2005) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.147 0.300 0.447 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 4.741 0.000 0.000 0.000 4.864 0.000 0.000 0.000 4.966 0.000 1.393 0.000 14.571 0.000 1.393 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 4.741 0.000 0.000 0.000 5.011 0.000 0.000 0.000 6.659 0.000 0.000 0.000 16.411 0.000 0.000 0.000 4.741 5.011 6.659 16.411 0 0 0 0 0 0 0 0 (4) 0 0 0 (4) 0 5.244 17.233 76.750 13.730 2.516 17.188 132.661 Exhibit BC-02 BRAC Implementation Cost and Savings === page 56 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Riverbank Army Ammunition Plant, CA (2005) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 5.259 0.111 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 5.370 0.000 0.000 5.370 10.067 0.000 0.000 10.067 1.497 0.000 0.000 1.497 16.934 0.000 0.000 16.934 9.952 0.115 1.379 0.118 16.590 0.344 Exhibit BC-04 === page 57 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Plant (2005) Army/California/Riverbank Army Ammunition Closure Package: Closure of Riverbank Army Ammunition Plant, CA. Relocate the artillery cartridge case metal parts functions to Rock Island, IL. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $1.379 million. Caretaker: These funds are for routine maintenance, repair, and utility requirements. Caretaker functions will continue until properties are conveyed. The FY 2027 budget estimate is $0.118 million. Exhibit BC-03 === page 58 === TAB 8 === page 59 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Sacramento Army Depot, CA (1991) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request 0.000 0.000 0.000 3.407 0.000 0.000 0.000 0.000 3.407 0.000 0.000 3.407 0.000 0.000 0.000 0.935 0.000 0.000 0.000 0.000 0.935 0.000 0.000 0.935 0.000 0.000 0.000 37.604 0.000 0.000 0.000 0.000 37.604 0.000 (3.964) 33.640 0.000 0.000 0.000 60.616 0.872 0.000 0.000 0.000 61.488 0.000 (2.800) 58.688 0.000 0.000 0.000 17.359 0.000 0.000 0.000 0.000 17.359 0.000 (1.128) 16.231 0.000 0.000 0.000 57.096 0.723 0.000 0.000 0.000 57.819 0.000 0.000 57.819 0.000 0.000 0.000 177.017 1.595 0.000 0.000 0.000 178.612 0.000 (7.892) 170.720 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 3.407 0.935 33.640 58.688 16.231 57.819 170.720 Exhibit BC-02 BRAC Implementation Cost and Savings === page 60 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Sacramento Army Depot, CA (1991) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.407 0.935 33.640 58.688 16.231 57.819 170.720 Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues Exhibit BC-02 BRAC Implementation Cost and Savings === page 61 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Sacramento Army Depot, CA (1991) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 0.759 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 0.759 0.000 0.000 0.759 0.328 0.000 0.000 0.328 0.503 0.000 0.000 0.503 1.590 0.000 0.000 1.590 0.328 0.000 0.503 0.000 1.590 0.000 Exhibit BC-04 === page 62 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: (1991) Army/California/Sacramento Army Depot Closure Package: Close Sacramento Army Depot, CA. Realign workload via a public to public competition between Army depots and the Sacramento Air Logistics Center, CA. Realign the Communications Systems Test Activity to Fort Lewis, WA. Transfer the residual supply mission to the Defense Depot West at Sharpe Army Depot, CA or Tracy Army Depot, CA. Retain 50 acres for Reserve Component (RC) use. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Exhibit BC-03 === page 63 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $0.503 million. Caretaker: None. Exhibit BC-03 === page 64 === TAB 9 === page 65 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Pueblo Army Depot, CO (1988) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request 0.000 0.000 0.000 2.351 0.097 0.000 0.000 0.000 2.448 0.000 0.000 2.448 0.000 0.000 0.000 1.131 0.083 0.000 0.000 0.000 1.214 0.000 0.000 1.214 0.000 0.000 0.000 35.436 0.174 0.000 0.000 0.000 35.610 0.000 (8.577) 27.033 0.000 0.000 0.000 94.446 0.353 0.000 0.000 0.000 94.799 0.000 (6.239) 88.560 0.000 0.000 0.000 23.241 0.061 0.000 0.000 0.000 23.302 0.000 (0.963) 22.339 0.000 0.000 0.000 86.225 0.348 0.000 0.000 0.000 86.573 0.000 0.000 86.573 0.000 0.000 0.000 242.830 1.116 0.000 0.000 0.000 243.946 0.000 (15.779) 228.167 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 2.448 1.214 27.033 88.560 22.339 86.573 228.167 Exhibit BC-02 BRAC Implementation Cost and Savings === page 66 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Pueblo Army Depot, CO (1988) One-Time Savings Military Construction Family Housing - Construction . - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.448 1.214 27.033 88.560 22.339 86.573 228.167 Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues Exhibit BC-02 BRAC Implementation Cost and Savings === page 67 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Pueblo Army Depot, CO (1988) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 50.739 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 50.739 0.000 0.000 50.739 45.972 0.000 0.000 45.972 38.695 0.000 0.000 38.695 135.406 0.000 0.000 135.406 44.282 1.690 35.911 2.784 130.932 4.474 Exhibit BC-04 === page 68 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Army/Colorado/Pueblo Army Depot (1988) Realignment Package: Realign Pueblo Army Depot, CO to the maximum extent in order to facilitate closure as soon as the chemical demilitarization mission was completed. Relocate the supply mission to Tooele Army Depot, UT. Relocate ammunition mission to Red River Army Depot, TX. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Exhibit BC-03 === page 69 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $35.911 million. Caretaker: These funds are for routine maintenance, repair, and utility requirements. Caretaker functions will continue until properties are conveyed. The FY 2027 budget estimate is $2.784 million. Exhibit BC-03 === page 70 === TAB 10 === page 71 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Stratford Army Engine Plant, CT (1995) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request 0.000 0.000 0.000 0.413 0.017 0.000 0.000 0.000 0.430 0.000 0.000 0.430 0.000 0.000 0.000 1.682 2.930 0.000 0.000 0.000 4.612 0.000 0.000 4.612 0.000 0.000 0.000 3.130 5.462 0.000 0.000 0.000 8.592 0.000 (0.117) 8.475 0.000 0.000 0.000 10.467 1.871 0.000 0.000 0.000 12.338 0.000 (6.065) 6.273 0.000 0.000 0.000 0.170 0.250 0.000 0.000 0.000 0.420 0.000 (0.368) 0.052 0.000 0.000 0.000 0.283 1.598 0.000 0.000 0.000 1.881 0.000 0.000 1.881 0.000 0.000 0.000 16.145 12.128 0.000 0.000 0.000 28.273 0.000 (6.550) 21.723 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.602 0.000 0.000 0.602 0.000 0.000 0.000 0.604 0.000 0.000 0.604 0.000 0.000 0.000 0.613 0.000 0.000 0.613 0.000 0.000 0.000 0.618 0.000 0.000 0.618 0.000 0.000 0.000 0.624 0.000 0.000 0.624 0.000 0.000 0.000 3.061 0.000 0.000 3.061 Grand Total One-Time Implementation Costs 0.430 5.214 9.079 6.886 0.670 2.505 24.784 Exhibit BC-02 BRAC Implementation Cost and Savings === page 72 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Stratford Army Engine Plant, CT (1995) One-Time Savings Military Construction Family Housing - Construction . - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.977 0.000 0.000 5.977 0.000 0.000 0.000 5.977 0.000 0.000 5.977 0.000 0.000 0.000 5.977 0.000 0.000 5.977 0.000 0.000 0.000 5.977 0.000 0.000 5.977 0.000 0.000 0.000 23.908 0.000 0.000 23.908 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.977 5.977 5.977 5.977 23.908 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.430 5.214 3.102 0.909 (5.307) (3.472) 0.876 Exhibit BC-02 BRAC Implementation Cost and Savings === page 73 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Stratford Army Engine Plant, CT (1995) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 39.860 0.949 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 40.809 0.000 0.000 40.809 0.364 0.000 0.000 0.364 0.343 0.000 0.000 0.343 41.516 0.000 0.000 41.516 0.000 0.364 0.000 0.343 39.860 1.656 Exhibit BC-04 === page 74 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Plant (1995) Army/Connecticut/Stratford Army Engine Closure Package: Close Stratford Army Engine Plant, CT. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Continuing Environmental and Caretaker Costs: Environmental: None. Caretaker: These funds are for the technical oversight of Environmental Support Cooperative Agreements (ESCAs). The FY 2027 budget estimate is $0.343 million. Exhibit BC-03 === page 75 === TAB 11 === page 76 === FY 2027 Budget Estimates Base Realignment and Closure Account - 2005 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Walter Reed National Military Medical Center, DC (2005) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 0.000 0.000 0.000 0.750 0.000 0.000 0.000 0.000 0.750 0.000 0.000 0.750 0.000 0.000 0.000 0.023 0.017 0.000 0.000 0.000 0.040 0.000 0.000 0.040 27.600 0.000 0.000 0.704 0.681 0.000 0.000 0.000 28.985 0.000 0.000 28.985 87.341 0.000 0.000 0.120 0.876 0.000 0.039 0.000 88.376 0.000 0.000 88.376 27.842 0.000 0.000 3.686 45.243 0.000 3.804 0.000 80.575 0.000 0.000 80.575 0.000 0.000 0.000 0.953 77.973 0.000 1.812 0.000 80.738 0.000 0.000 80.738 142.783 0.000 0.000 6.236 124.790 0.000 5.655 0.000 279.464 0.000 0.000 279.464 One-Time Costs Funded Outside of the Account: Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account: 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.192 0.000 0.000 0.192 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.192 0.000 0.000 0.192 Grand Total One-Time Implementation Costs 0.750 0.040 28.985 88.568 80.575 80.738 279.656 Recurring Costs: (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs (memo non-add): 0.000 0.000 0.000 0.000 0.127 0.000 0.000 0.127 2.332 0.000 0.000 2.332 7.095 0.000 0.000 7.095 18.350 0.000 3.623 21.973 12.119 0.000 5.636 17.755 40.023 0.000 9.259 49.282 One-Time Implementation Costs: Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Estimated Land Revenues Budget Request FY 2011 FY 2006-2011 Exhibit BC-02 BRAC Implementation Cost and Savings === page 77 === FY 2027 Budget Estimates Base Realignment and Closure Account - 2005 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Walter Reed National Military Medical Center, DC (2005) One-Time Savings: Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings: Recurring Savings: Civilian Salary: Military Personnel Entitlements: Officer Salary Enlisted Salary Housing Allowance Overhead: Family Housing Operations Sustainment Recapitalization BOS Other: Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues: FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 48.152 0.000 0.000 0.000 0.000 0.000 48.152 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 48.152 0.000 0.000 0.000 0.000 0.000 48.152 0.000 0.000 1.346 3.871 5.292 5.403 15.912 0.000 0.000 0.000 0.000 0.000 0.000 0.928 0.609 0.409 1.984 1.411 0.892 3.268 2.408 1.913 4.324 3.366 3.190 10.504 7.794 6.404 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.458 0.000 8.750 0.000 11.194 0.000 19.352 0.000 17.226 0.000 30.107 0.000 17.587 0.000 33.870 0.000 51.465 0.000 92.079 0.000 48.152 8.750 19.352 30.107 33.870 140.231 0 0 1 0 (38) (29) (38) (29) 8 (37) (866) (255) (933) (350) 0.750 (48.112) 20.235 69.216 50.468 46.868 139.425 Exhibit BC-02 BRAC Implementation Cost and Savings === page 78 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Walter Reed National Military Medical Center, DC (2005) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 0.049 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 0.049 0.000 0.000 0.049 0.000 0.000 0.000 0.000 0.002 0.000 0.000 0.002 0.051 0.000 0.000 0.051 0.000 0.000 0.002 0.000 0.051 0.000 Exhibit BC-04 === page 79 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Army/Washington, DC/Walter Reed National Military Medical Center (2005) Closure Package: Realignment of Walter Reed Army Medical Center, Washington, DC, as follows: relocate all tertiary (subspecialty and complex care) medical services to National Naval Medical Center, Bethesda, MD, establishing it as the Walter Reed National Military Medical Center Bethesda, MD; relocate Legal Medicine to the new Walter Reed National Military Medical Center Bethesda, MD; relocate sufficient personnel to the new Walter Reed National Military Medical Center Bethesda, MD, to establish a Program Management Office that will coordinate pathology results, contract administration, and quality assurance and control of DoW second opinion consults worldwide; relocate all non-tertiary (primary and specialty) patient care functions to a new community hospital at Ft Belvoir, VA; relocate the Office of the Secretary of War supporting unit to Fort Belvoir, VA; disestablish all elements of the Armed Forces Institute of Pathology except the National Medical Museum and the Tissue Repository; relocate the Armed Forces Medical Examiner, DNA Registry, and Accident Investigation to Dover Air Force Base, DE; AFIP capabilities not specified in this recommendation will be absorbed into other DoW, Federal, or civilian facilities, as necessary; relocate enlisted histology technician training to Fort Sam Houston, TX; relocate the Combat Casualty Care Research sub-function(with the exception of those organizational elements performing neuro-protection research) of the Walter Reed Army Institute of Research (Forest Glen Annex) and the Combat Casualty Care Research sub-function of the Naval Medical Research Center (Forest Glen Annex) to the Army Institute of Surgical Research, Fort Sam Houston, TX; relocate Medical Biological Defense Research of the Walter Reed Army Institute of Research (Forest Glen Annex) and Naval Medical Research Center (Forest Glen Annex) to Fort Detrick, MD, and consolidate it with US Army Medical Research Institute of Infectious Diseases; relocate Medical Chemical Defense Research of the Walter Reed Army Institute of Research (Forest Glen Annex) to Aberdeen Proving Ground, MD, and consolidate it with the US Army Medical Research Institute of Chemical Defense; and close the main post. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: None. Exhibit BC-03 === page 80 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $0.002 million. Caretaker: None. Exhibit BC-03 === page 81 === TAB 12 === page 82 === FY 2027 Budget Estimates Base Realignment and Closure Account - 2005 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. Gillem, GA (2005) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request FY 2011 FY 2006-2011 0.000 0.000 0.000 1.475 0.017 0.000 0.000 0.000 1.492 0.000 0.000 1.492 8.987 0.000 0.000 0.412 0.395 0.000 0.000 0.000 9.794 0.000 0.000 9.794 0.000 0.000 0.000 0.124 0.744 0.000 0.020 0.000 0.888 0.000 0.000 0.888 39.076 0.000 0.000 3.079 0.399 0.000 0.310 0.000 42.864 0.000 0.000 42.864 33.766 0.000 0.000 3.294 42.250 0.000 9.953 0.000 89.263 0.000 0.000 89.263 0.000 0.000 0.000 1.192 27.124 0.000 0.733 0.000 29.049 0.000 0.000 29.049 81.829 0.000 0.000 9.576 70.929 0.000 11.016 0.000 173.350 0.000 0.000 173.350 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.582 0.000 0.000 0.582 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.582 0.000 0.000 0.582 Grand Total One-Time Implementation Costs 1.492 9.794 0.888 43.446 89.263 29.049 173.932 Recurring Costs (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs (memo non-add) 0.000 0.000 0.000 0.000 0.003 0.000 0.000 0.003 0.366 0.207 0.000 0.573 2.087 1.845 0.000 3.932 3.107 1.910 0.000 5.017 3.237 2.849 0.000 6.086 8.800 6.811 0.000 15.611 Exhibit BC-02 BRAC Implementation Cost and Savings === page 83 === FY 2027 Budget Estimates Base Realignment and Closure Account - 2005 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. Gillem, GA (2005) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.011 0.000 0.011 0.000 0.000 0.000 0.000 1.300 0.000 1.300 0.000 0.000 0.000 0.000 1.311 0.000 1.311 0.000 0.000 0.000 0.000 0.000 8.030 8.030 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.352 3.065 5.262 0.352 3.065 5.262 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.067 7.419 1.023 0.000 7.091 7.607 1.049 0.000 7.274 7.804 1.076 0.000 7.427 7.968 1.099 0.000 21.859 30.798 4.247 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 8.509 0.000 0.000 0.000 15.747 0.000 0.000 0.000 16.154 0.000 0.000 0.000 33.203 0.000 0.000 0.000 73.613 0.000 0.000 8.509 15.747 16.165 34.503 74.924 0 0 0 0 3 0 1 0 2 0 (211) (71) (205) (71) 1.492 9.794 (7.621) 27.699 73.098 (5.454) 99.008 Exhibit BC-02 BRAC Implementation Cost and Savings === page 84 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Ft. Gillem, GA (2005) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 0.450 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 0.450 0.000 0.000 0.450 0.425 0.000 0.000 0.425 0.627 0.000 0.000 0.627 1.502 0.000 0.000 1.502 0.425 0.000 0.627 0.000 1.502 0.000 Exhibit BC-04 === page 85 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Army/Georgia/Ft. Gillem (2005) Closure Package: a. Close Fort Gillem, GA. Relocate the Headquarters, 1st US Army to Rock Island Arsenal, IL. Relocate the 2d Recruiting Brigade to Redstone Arsenal, AL. Relocate the 52d Explosive Ordnance Disposal (EOD) Group to Fort Campbell, KY. Relocate the 81st RRC Equipment Concentration Site to Fort Benning, GA. Relocate the 3d US Army Headquarters support office to Shaw Air Force Base, SC. Relocate the Headquarters US Forces Command (FORSCOM) VIP Explosive Ordnance Support to Pope Air Force Base, NC. b. Close the Army-Air Force Exchange System (AAFES) Atlanta Distribution Center and establish a contiguous enclave for the Georgia Army National Guard, the remainder of the 81st RRC units and the Criminal Investigation Division (CID) Forensics Laboratory. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: Family Housing Operations: None. None. Exhibit BC-03 None. === page 86 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Operation and Maintenance: Military Personnel: Other: None. None. None. Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $0.627 million. Caretaker: None. Exhibit BC-03 === page 87 === TAB 13 === page 88 === FY 2027 Budget Estimates Base Realignment and Closure Account - 2005 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. McPherson, GA (2005) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request FY 2011 FY 2006-2011 0.000 0.000 0.000 0.788 0.000 0.000 0.000 0.000 0.788 0.000 0.000 0.788 0.000 0.000 0.000 0.302 0.082 0.000 0.000 0.000 0.384 0.000 0.000 0.384 25.000 0.000 0.000 0.761 0.231 0.000 0.603 0.000 26.595 0.000 0.000 26.595 241.422 0.000 0.000 3.652 17.639 0.000 16.210 0.000 278.923 0.000 0.000 278.923 166.126 0.000 0.000 0.567 129.980 0.000 113.312 0.000 409.985 0.000 0.000 409.985 0.000 0.000 0.000 0.189 96.505 0.000 1.655 0.000 98.349 0.000 0.000 98.349 432.548 0.000 0.000 6.259 244.437 0.000 131.780 0.000 815.024 0.000 0.000 815.024 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.484 0.000 0.000 1.484 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.484 0.000 0.000 1.484 Grand Total One-Time Implementation Costs 0.788 0.384 26.595 280.407 409.985 98.349 816.508 Recurring Costs (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs (memo non-add) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.348 2.975 0.000 8.323 7.241 12.228 0.000 19.469 21.266 21.176 13.027 55.469 21.867 21.634 13.301 56.802 55.722 58.013 26.328 140.064 Exhibit BC-02 BRAC Implementation Cost and Savings === page 89 === FY 2027 Budget Estimates Base Realignment and Closure Account - 2005 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. McPherson, GA (2005) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.074 1.777 1.851 0.000 0.000 0.000 0.000 7.131 1.861 8.992 0.000 0.000 0.000 0.000 7.205 3.638 10.843 0.000 0.000 0.000 0.000 48.606 49.668 98.273 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 6.348 22.018 23.175 6.481 22.480 23.662 12.829 44.498 46.837 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.153 4.178 23.649 0.000 5.262 4.266 24.146 0.000 10.415 8.444 47.794 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.290 134.417 0.000 4.707 2.676 143.347 0.000 4.707 3.966 277.764 0.000 0.000 0.000 0.000 136.268 152.339 288.607 0 0 0 0 0 0 0 0 (225) (90) (387) (198) (612) (288) 0.788 0.384 26.595 280.407 273.717 (53.990) 527.901 Exhibit BC-02 BRAC Implementation Cost and Savings === page 90 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Ft. McPherson, GA (2005) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 0.217 0.001 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 0.218 0.000 0.000 0.218 0.094 0.000 0.000 0.094 0.098 0.000 0.000 0.098 0.410 0.000 0.000 0.410 0.094 0.000 0.098 0.000 0.409 0.001 Exhibit BC-04 === page 91 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Army/Georgia/Ft. McPherson (2005) Closure Package: Close Fort McPherson, GA. Relocate the Headquarters US Army Forces Command (FORSCOM), and the Headquarters US Army Reserve Command (USARC) to Pope Air Force Base, NC. Relocate the Headquarters 3rd US Army to Shaw Air Force Base, SC. Relocate the Installation Management Agency (IMA) Southeastern Region Headquarters and the US Army Network Enterprise Technology Command (NETCOM) Southeastern Region Headquarters to Fort Eustis, VA. Relocate the Army Contracting Agency (ACA) Southern Region Headquarters to Fort Sam Houston, TX. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Exhibit BC-03 None. === page 92 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $0.098 million. Caretaker: None. Exhibit BC-03 === page 93 === TAB 14 === page 94 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. Sheridan, IL (1988) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request 0.000 0.000 0.000 2.351 0.097 0.000 0.000 0.000 2.448 0.000 0.000 2.448 0.000 0.000 0.000 1.131 0.083 0.000 0.000 0.000 1.214 0.000 0.000 1.214 0.000 0.000 0.000 35.436 0.174 0.000 0.000 0.000 35.610 0.000 (8.577) 27.033 0.000 0.000 0.000 94.446 0.353 0.000 0.000 0.000 94.799 0.000 (6.239) 88.560 0.000 0.000 0.000 23.241 0.061 0.000 0.000 0.000 23.302 0.000 (0.963) 22.339 0.000 0.000 0.000 86.225 0.348 0.000 0.000 0.000 86.573 0.000 0.000 86.573 0.000 0.000 0.000 242.830 1.116 0.000 0.000 0.000 243.946 0.000 (15.779) 228.167 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 2.448 1.214 27.033 88.560 22.339 86.573 228.167 Exhibit BC-02 BRAC Implementation Cost and Savings === page 95 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. Sheridan, IL (1988) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.448 1.214 27.033 88.560 22.339 86.573 228.167 Exhibit BC-02 BRAC Implementation Cost and Savings === page 96 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Ft. Sheridan, IL (1988) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 0.145 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 0.145 0.000 0.000 0.145 0.145 0.000 0.000 0.145 0.038 0.000 0.000 0.038 0.328 0.000 0.000 0.328 0.145 0.000 0.038 0.000 0.328 0.000 Exhibit BC-04 === page 97 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Army/Illinois/Ft. Sheridan (1988) Closure Package: Closure of Fort Sheridan, IL. Relocation of the Headquarters, Fourth Army, and Headquarters, United States Army Recruiting Command to Fort Benjamin Harrison, IN. Relocation of the United States Army Recruiting Battalion Chicago, IL, and United States Army Recruiting Brigade Midwest to leased space in Chicago, IL. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Exhibit BC-03 === page 98 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $0.038 million. Caretaker: None. Exhibit BC-03 === page 99 === TAB 15 === page 100 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Savanna Army Depot Activity, IL (1995) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request FY 2001 FY 1996-2001 0.000 0.000 0.000 2.722 7.145 0.000 0.000 0.000 9.867 0.000 0.000 9.867 14.121 0.000 0.000 5.118 0.295 0.000 1.108 0.000 20.642 0.000 0.000 20.642 8.702 0.000 0.000 11.314 10.846 0.000 0.000 0.000 30.862 0.000 0.000 30.862 1.338 0.000 0.000 15.187 17.966 0.000 0.000 0.000 34.491 0.000 (0.008) 34.483 0.000 0.000 0.000 1.067 0.000 0.000 0.000 0.000 1.067 0.000 0.000 1.067 0.000 0.000 0.000 19.822 0.248 0.000 0.000 0.000 20.070 0.000 0.000 20.070 24.161 0.000 0.000 55.230 36.500 0.000 1.108 0.000 116.999 0.000 (0.008) 116.991 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.212 0.000 0.000 0.212 0.000 0.000 0.000 0.013 0.000 0.000 0.013 0.000 0.000 0.000 0.013 0.000 0.000 0.013 0.000 0.000 0.000 0.008 0.000 0.000 0.008 0.000 0.000 0.000 0.005 0.000 0.000 0.005 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.251 0.000 0.000 0.251 Grand Total One-Time Implementation Costs 10.079 20.655 30.875 34.491 1.072 20.070 117.242 Exhibit BC-02 BRAC Implementation Cost and Savings === page 101 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Savanna Army Depot Activity, IL (1995) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.462 0.000 0.000 0.462 0.000 0.000 0.124 11.074 0.000 0.000 11.198 0.000 0.000 0.127 11.210 0.000 0.000 11.337 0.000 0.000 0.251 22.746 0.000 0.000 22.997 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.462 11.198 11.337 22.997 0 0 30 0 60 0 90 0 120 0 172 0 172 0 10.079 20.655 30.875 34.029 (10.126) 8.733 94.245 Exhibit BC-02 BRAC Implementation Cost and Savings === page 102 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Savanna Army Depot Activity, IL (1995) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 0.852 0.099 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 0.951 0.000 0.000 0.951 1.300 0.000 0.000 1.300 1.987 0.000 0.000 1.987 4.238 0.000 0.000 4.238 1.225 0.075 1.912 0.075 3.989 0.249 Exhibit BC-04 === page 103 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Activity (1995) Army/Illinois/Savanna Army Depot Closure Package: Closure of Savanna Army Depot Activity (ADA), IL. Relocate the United States Army Defense Ammunition Center and School (USADACS), IL to McAlester Army Ammunition Plant, OK. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Exhibit BC-03 === page 104 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $1.912 million. Caretaker: These funds are for routine maintenance, repair, and utility requirements. Caretaker functions will continue until properties are conveyed. The FY 2027 budget estimate is $0.075 million. Exhibit BC-03 === page 105 === TAB 16 === page 106 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. Meade, MD (1988 & 1995) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request 0.000 0.000 0.000 2.351 0.097 0.000 0.000 0.000 2.448 0.000 0.000 2.448 0.000 0.000 0.000 1.131 0.083 0.000 0.000 0.000 1.214 0.000 0.000 1.214 0.000 0.000 0.000 35.436 0.174 0.000 0.000 0.000 35.610 0.000 (8.577) 27.033 0.000 0.000 0.000 94.446 0.353 0.000 0.000 0.000 94.799 0.000 (6.239) 88.560 0.000 0.000 0.000 23.241 0.061 0.000 0.000 0.000 23.302 0.000 (0.963) 22.339 0.000 0.000 0.000 86.225 0.348 0.000 0.000 0.000 86.573 0.000 0.000 86.573 0.000 0.000 0.000 242.830 1.116 0.000 0.000 0.000 243.946 0.000 (15.779) 228.167 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 2.448 1.214 27.033 88.560 22.339 86.573 228.167 Exhibit BC-02 BRAC Implementation Cost and Savings === page 107 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. Meade, MD (1988 & 1995) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.448 1.214 27.033 88.560 22.339 86.573 228.167 Exhibit BC-02 BRAC Implementation Cost and Savings === page 108 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Ft. Meade, MD (1988 & 1995) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 0.607 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 0.607 0.000 0.000 0.607 0.313 0.000 0.000 0.313 0.024 0.000 0.000 0.024 0.944 0.000 0.000 0.944 0.313 0.000 0.024 0.000 0.944 0.000 Exhibit BC-04 === page 109 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Army/Maryland/Ft. Meade (1988 & 1995) Realignment Package: BRAC 88: Realign Fort Meade, MD by closing range and training areas, including the airfield; and relocating activities of the Criminal Investigation Command (CIDC) at Fort Meade, MD by moving it to Fort Belvoir, VA. BRAC 95: Realign Fort Meade, MD by reducing Kimbrough Army Community Hospital to a clinic by eliminating inpatient services. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Exhibit BC-03 === page 110 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Continuing Environmental and Caretaker Costs: Environmental: Continued funding of long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $0.024 million. Caretaker: None. Exhibit BC-03 === page 111 === TAB 17 === page 112 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. Ritchie, MD (1995) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request FY 2001 FY 1996-2001 20.488 0.000 0.000 2.113 0.139 0.000 0.428 0.000 23.168 0.000 0.000 23.168 11.454 0.000 0.000 0.520 1.326 0.000 0.344 0.000 13.644 0.000 0.000 13.644 0.754 0.000 0.000 4.356 4.043 0.000 0.328 0.000 9.481 0.000 (0.039) 9.442 2.589 0.000 0.000 6.154 2.308 0.000 0.000 0.000 11.051 0.000 (0.015) 11.036 0.000 0.000 0.000 0.561 0.305 0.000 0.000 0.000 0.866 0.000 0.000 0.866 0.000 0.000 0.000 0.263 0.245 0.000 0.000 0.000 0.508 0.000 0.000 0.508 35.285 0.000 0.000 13.967 8.366 0.000 1.100 0.000 58.718 0.000 (0.054) 58.664 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.572 0.000 0.000 0.572 0.000 0.000 0.000 0.292 0.000 0.000 0.292 0.000 0.000 0.000 0.212 0.000 0.000 0.212 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.076 0.000 0.000 1.076 Grand Total One-Time Implementation Costs 23.740 13.936 9.654 11.036 0.866 0.508 59.740 Exhibit BC-02 BRAC Implementation Cost and Savings === page 113 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. Ritchie, MD (1995) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.606 2.748 0.000 0.000 3.354 0.000 0.000 0.000 11.201 0.000 0.000 11.201 0.000 0.000 0.000 11.447 0.000 0.000 11.447 0.000 0.000 0.000 12.411 0.000 0.000 12.411 0.000 0.000 0.606 37.807 0.000 0.000 38.413 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total Savings 0.000 0.000 3.354 11.201 11.447 12.411 38.413 0 0 0 0 164 0 164 0 164 0 182 0 182 0 23.740 13.936 6.300 (0.165) (10.581) (11.903) 21.327 Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues Exhibit BC-02 BRAC Implementation Cost and Savings === page 114 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Ft. Ritchie, MD (1995) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 0.446 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 0.446 0.000 0.000 0.446 0.024 0.000 0.000 0.024 0.062 0.000 0.000 0.062 0.532 0.000 0.000 0.532 0.024 0.000 0.062 0.000 0.532 0.000 Exhibit BC-04 === page 115 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Army/Maryland/Ft. Ritchie (1995) Closure Package: Close Fort Ritchie, MD except for a National Guard enclave. Relocate the 1111th Signal Battalion and 1108th Signal Brigade to Fort Detrick, MD. Relocate Information Systems Engineering Command elements to Fort Huachuca, AZ. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Exhibit BC-03 === page 116 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $0.062 million. Caretaker: None. Exhibit BC-03 === page 117 === TAB 18 === page 118 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Army Material Technology Laboratory, Watertown, MA (1988) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request 0.000 0.000 0.000 2.351 0.097 0.000 0.000 0.000 2.448 0.000 0.000 2.448 0.000 0.000 0.000 1.131 0.083 0.000 0.000 0.000 1.214 0.000 0.000 1.214 0.000 0.000 0.000 35.436 0.174 0.000 0.000 0.000 35.610 0.000 (8.577) 27.033 0.000 0.000 0.000 94.446 0.353 0.000 0.000 0.000 94.799 0.000 (6.239) 88.560 0.000 0.000 0.000 23.241 0.061 0.000 0.000 0.000 23.302 0.000 (0.963) 22.339 0.000 0.000 0.000 86.225 0.348 0.000 0.000 0.000 86.573 0.000 0.000 86.573 0.000 0.000 0.000 242.830 1.116 0.000 0.000 0.000 243.946 0.000 (15.779) 228.167 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 2.448 1.214 27.033 88.560 22.339 86.573 228.167 Exhibit BC-02 BRAC Implementation Cost and Savings === page 119 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Army Material Technology Laboratory, Watertown, MA (1988) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.448 1.214 27.033 88.560 22.339 86.573 228.167 Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues Exhibit BC-02 BRAC Implementation Cost and Savings === page 120 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Army Material Technology Laboratory, Watertown, MA (1988) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 2.255 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 2.255 0.000 0.000 2.255 0.000 0.000 0.000 0.000 0.013 0.000 0.000 0.013 2.268 0.000 0.000 2.268 0.000 0.000 0.013 0.000 2.268 0.000 Exhibit BC-04 === page 121 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Army/Massachusetts/Army Material Technology Laboratory Watertown (1988) Closure Package: Close the Army Material Technology Laboratory (AMTL) Watertown, MA. AMTL Watertown, MA was closed in 1995 and various transfers of property over the next few years with the final property transfer in 2004. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $0.013 million. Caretaker: None. Exhibit BC-03 === page 122 === TAB 19 === page 123 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. Devens, MA (1988 & 1991) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request 0.000 0.000 0.000 3.407 0.000 0.000 0.000 0.000 3.407 0.000 0.000 3.407 0.000 0.000 0.000 0.935 0.000 0.000 0.000 0.000 0.935 0.000 0.000 0.935 0.000 0.000 0.000 37.604 0.000 0.000 0.000 0.000 37.604 0.000 (3.964) 33.640 0.000 0.000 0.000 60.616 0.872 0.000 0.000 0.000 61.488 0.000 (2.800) 58.688 0.000 0.000 0.000 17.359 0.000 0.000 0.000 0.000 17.359 0.000 (1.128) 16.231 0.000 0.000 0.000 57.096 0.723 0.000 0.000 0.000 57.819 0.000 0.000 57.819 0.000 0.000 0.000 177.017 1.595 0.000 0.000 0.000 178.612 0.000 (7.892) 170.720 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 3.407 0.935 33.640 58.688 16.231 57.819 170.720 Recurring Costs (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs: (memo non-add) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Exhibit BC-02 BRAC Implementation Cost and Savings === page 124 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. Devens, MA (1988 & 1991) One-Time Savings Military Construction Family Housing - Construction - Operations Operations & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues FY 1996 FY 1997 FY 1998 FY1999 FY2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.407 0.935 33.640 58.688 16.231 57.819 170.720 Exhibit BC-02 BRAC Implementation Cost and Savings === page 125 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Ft. Devens, MA (1988 & 1991) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 9.538 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 9.538 0.000 0.000 9.538 3.337 0.000 0.000 3.337 2.007 0.000 0.000 2.007 14.882 0.000 0.000 14.882 3.337 0.000 2.007 0.000 14.882 0.000 Exhibit BC-04 === page 126 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: 1991) Army/Massachusetts/Ft. Devens (1988 & Closure/Realignment Package: BRAC 88: a. Realign Fort Devens, MA and Fort Huachuca, AZ. Relocate the Intelligence School, Fort Devens, MA to Fort Huachuca, AZ and consolidate with the Intelligence Center and School. b. The following relocations were changed based on BRAC 91. Headquarters ISC will not relocate to Fort Devens, MA but will remain at Fort Huachuca, AZ. ISC units at Fort Belvoir, VA will not relocate to Fort Devens, MA, but will remain at Fort Belvoir, VA. BRAC 91: Close Fort Devens, MA, retaining only facilities to support Reserve Component training requirements. Create a small reserve enclave on Fort Devens, MA main post and retain approximately 4,600 acres for Reserve Component training; relocate the 10th Special Forces Group (SFG) (Airborne) from Fort Devens, MA to Fort Carson, CO. Essential facilities and training areas will be retained. Excess facilities and land will be sold. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Exhibit BC-03 === page 127 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $2.007 million. Caretaker: None. Exhibit BC-03 === page 128 === TAB 20 === page 129 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Sudbury Training Annex, MA (1995) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request FY 2001 FY 1996-2001 0.000 0.000 0.000 5.256 0.089 0.000 0.000 0.000 5.345 0.000 0.000 5.345 0.000 0.000 0.000 1.034 0.163 0.000 0.000 0.000 1.197 0.000 0.000 1.197 0.000 0.000 0.000 0.587 0.849 0.000 0.000 0.000 1.436 0.000 0.000 1.436 0.000 0.000 0.000 0.793 0.000 0.000 0.000 0.000 0.793 0.000 0.000 0.793 0.000 0.000 0.000 0.627 0.000 0.000 0.000 0.000 0.627 0.000 0.000 0.627 0.000 0.000 0.000 2.126 0.025 0.000 0.000 0.000 2.151 0.000 0.000 2.151 0.000 0.000 0.000 10.423 1.126 0.000 0.000 0.000 11.549 0.000 0.000 11.549 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.313 0.000 0.000 0.313 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.313 0.000 0.000 0.313 Grand Total One-Time Implementation Costs 5.345 1.510 1.436 0.793 0.627 2.151 11.862 Exhibit BC-02 BRAC Implementation Cost and Savings === page 130 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Sudbury Training Annex, MA (1995) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.037 0.096 0.000 0.000 0.133 0.000 0.000 0.000 0.096 0.000 0.000 0.096 0.000 0.000 0.000 0.500 0.000 0.000 0.500 0.000 0.000 0.000 0.500 0.000 0.000 0.500 0.000 0.000 0.037 1.192 0.000 0.000 1.229 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.133 0.096 0.500 0.500 1.229 0 0 0 0 117 0 117 0 117 0 117 0 117 0 5.345 1.510 1.303 0.697 0.127 1.651 10.633 Exhibit BC-02 BRAC Implementation Cost and Savings === page 131 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Sudbury Training Annex, MA (1995) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 0.201 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 0.201 0.000 0.000 0.201 0.406 0.000 0.000 0.406 0.039 0.000 0.000 0.039 0.646 0.000 0.000 0.646 0.406 0.000 0.039 0.000 0.646 0.000 Exhibit BC-04 === page 132 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Army/Massachusetts/Sudbury Training Annex (1995) Closure Package: Closure of Sudbury Training Annex, MA. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Continuing Environmental and Caretaker Costs: Environmental: Long term monitoring continues and is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $0.039 million. Caretaker: None. Exhibit BC-03 === page 133 === TAB 21 === page 134 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Detroit Arsenal, MI (1995) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 1.863 0.478 0.000 0.000 2.341 0.000 0.000 2.341 0.000 0.000 0.000 0.000 2.468 0.561 0.000 0.000 3.029 0.000 0.000 3.029 6.895 0.000 0.000 0.000 5.159 5.175 0.000 0.000 17.229 0.000 (3.715) 13.514 0.000 0.000 0.000 0.000 1.293 0.384 0.000 0.000 1.677 0.000 (0.600) 1.077 0.000 0.000 0.000 0.000 0.025 0.000 0.000 0.000 0.025 0.000 (1.609) (1.584) 0.000 0.000 0.000 0.000 0.054 0.000 0.000 0.000 0.054 0.000 0.000 0.054 6.895 0.000 0.000 0.000 10.862 6.598 0.000 0.000 24.355 0.000 (5.924) 18.431 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.366 0.000 0.000 0.366 0.000 0.000 0.000 0.321 0.000 0.000 0.321 0.000 0.000 0.000 0.379 0.000 0.000 0.379 0.000 0.000 0.000 0.386 0.000 0.000 0.386 0.000 0.000 0.000 0.393 0.000 0.000 0.393 0.000 0.000 0.000 1.845 0.000 0.000 1.845 Grand Total One-Time Implementation Costs 2.341 3.395 13.835 1.456 (1.198) 0.447 20.276 Exhibit BC-02 BRAC Implementation Cost and Savings === page 135 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Detroit Arsenal, MI (1995) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 (0.754) 0.000 0.000 (0.754) 0.000 0.000 0.000 (0.091) 0.000 0.000 (0.091) 0.000 0.000 0.000 1.944 0.000 0.000 1.944 0.000 0.000 0.000 2.345 0.000 0.000 2.345 0.000 0.000 0.000 2.873 0.000 0.000 2.873 0.000 0.000 0.000 6.317 0.000 0.000 6.317 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 (0.754) (0.091) 1.944 2.345 2.873 6.317 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.341 4.149 13.926 (0.488) (3.543) (2.426) 13.959 Exhibit BC-02 BRAC Implementation Cost and Savings === page 136 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Detroit Arsenal, MI (1995) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 1.868 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 1.868 0.000 0.000 1.868 1.481 0.000 0.000 1.481 0.053 0.000 0.000 0.053 3.402 0.000 0.000 3.402 1.481 0.000 0.053 0.000 3.402 0.000 Exhibit BC-04 === page 137 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Army/Michigan/Detroit Arsenal (1995) Realignment Package: Realign Detroit Arsenal, MI, by closing and disposing of the Detroit Army Tank Plant. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $0.053 million. Caretaker: None. Exhibit BC-03 === page 138 === TAB 22 === page 139 === FY 2027 Budget Estimates Base Realignment and Closure Account - 2005 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Mississippi Army Ammunition Plant, MS (2005) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request FY 2011 FY 2006-2011 0.000 0.000 0.000 0.779 0.649 0.000 0.000 0.000 1.428 0.000 0.000 1.428 0.000 0.000 0.000 0.050 0.000 0.000 0.000 0.000 0.050 0.000 0.000 0.050 0.000 0.000 0.000 0.118 0.000 0.000 0.000 0.000 0.118 0.000 0.000 0.118 0.000 0.000 0.000 1.330 0.977 0.000 0.000 0.000 2.307 0.000 0.000 2.307 0.000 0.000 0.000 1.773 0.196 0.000 0.000 0.000 1.969 0.000 0.000 1.969 0.000 0.000 0.000 0.069 0.061 0.000 0.000 0.000 0.130 0.000 0.000 0.130 0.000 0.000 0.000 4.119 1.883 0.000 0.000 0.000 6.002 0.000 0.000 6.002 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 1.428 0.050 0.118 2.307 1.969 0.130 6.002 Recurring Costs (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs: (memo non-add) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Exhibit BC-02 BRAC Implementation Cost and Savings === page 140 === FY 2027 Budget Estimates Base Realignment and Closure Account - 2005 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Mississippi Army Ammunition Plant, MS (2005) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.110 0.224 0.334 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 4.462 0.000 0.000 0.000 4.575 0.000 0.000 0.000 4.694 0.000 0.000 0.000 4.792 0.000 0.000 0.000 18.523 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 4.462 0.000 0.000 0.000 4.575 0.000 0.000 0.000 4.804 0.000 0.000 0.000 5.016 0.000 0.000 0.000 18.857 0.000 0.000 4.462 4.575 4.804 5.016 18.857 0 0 0 0 0 0 0 0 (3) 0 0 0 (3) 0 1.428 0.050 (4.344) (2.248) (2.835) (4.886) (12.835) Exhibit BC-02 BRAC Implementation Cost and Savings === page 141 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Mississippi Army Ammunition Plant, MS (2005) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 0.605 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 0.605 0.000 0.000 0.605 0.309 0.000 0.000 0.309 0.333 0.000 0.000 0.333 1.247 0.000 0.000 1.247 0.309 0.000 0.333 0.000 1.247 0.000 Exhibit BC-04 === page 142 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Plant, MS (2005) Army/Mississippi/Mississippi Army Ammunition Closure Package: Close Mississippi Army Ammunition Plant, MS. Relocate the 155MM ICM artillery metal parts functions to Rock Island Arsenal, IL. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Continuing Environmental and Caretaking Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $0.333 million. Caretaker: None. Exhibit BC-03 === page 143 === TAB 23 === page 144 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Camp Kilmer, NJ (1995) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request FY 2001 FY 1996-2001 0.000 0.000 0.000 1.143 0.107 0.000 0.000 0.000 1.250 0.000 0.000 1.250 0.000 0.000 0.000 2.039 0.282 0.000 0.000 0.000 2.321 0.000 0.000 2.321 0.000 0.000 0.000 1.040 0.039 0.000 0.000 0.000 1.079 0.000 0.000 1.079 0.000 0.000 0.000 1.335 0.011 0.000 0.000 0.000 1.346 0.000 0.000 1.346 0.000 0.000 0.000 2.960 0.000 0.000 0.000 0.000 2.960 0.000 0.000 2.960 0.000 0.000 0.000 0.107 0.117 0.000 0.000 0.000 0.224 0.000 0.000 0.224 0.000 0.000 0.000 8.624 0.556 0.000 0.000 0.000 9.180 0.000 0.000 9.180 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.177 0.000 0.000 0.177 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.177 0.000 0.000 0.177 Grand Total One-Time Implementation Costs 1.250 2.498 1.079 1.346 2.960 0.224 9.357 Exhibit BC-02 BRAC Implementation Cost and Savings === page 145 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Camp Kilmer, NJ (1995) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.400 0.000 0.000 0.400 0.000 0.000 0.000 0.400 0.000 0.000 0.400 0.000 0.000 0.000 0.400 0.000 0.000 0.400 0.000 0.000 0.000 0.400 0.000 0.000 0.400 0.000 0.000 0.000 1.600 0.000 0.000 1.600 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.400 0.400 0.400 0.400 1.600 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.250 2.498 0.679 0.946 2.560 (0.176) 7.757 Exhibit BC-02 BRAC Implementation Cost and Savings === page 146 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Camp Kilmer, NJ (1995) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 0.077 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 0.077 0.000 0.000 0.077 0.750 0.000 0.000 0.750 0.347 0.000 0.000 0.347 1.174 0.000 0.000 1.174 0.750 0.000 0.347 0.000 1.174 0.000 Exhibit BC-04 === page 147 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Army/New Jersey/Camp Kilmer (1995) Closure Package: Close Camp Kilmer, NJ, except an enclave for minimum necessary facilities to support the Reserve Components. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $0.347 million. Caretaker: None. Exhibit BC-03 === page 148 === TAB 24 === page 149 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Camp Pedricktown, NJ (1995) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 0.000 0.000 0.000 1.143 0.107 0.000 0.000 0.000 1.250 0.000 1.250 0.000 0.000 0.000 2.039 0.282 0.000 0.000 0.000 2.321 0.000 2.321 0.000 0.000 0.000 1.040 0.039 0.000 0.000 0.000 1.079 0.000 1.079 0.000 0.000 0.000 1.335 0.011 0.000 0.000 0.000 1.346 0.000 1.346 0.000 0.000 0.000 2.960 0.000 0.000 0.000 0.000 2.960 0.000 2.960 0.000 0.000 0.000 0.107 0.117 0.000 0.000 0.000 0.224 0.000 0.224 0.000 0.000 0.000 8.624 0.556 0.000 0.000 0.000 9.180 0.000 9.180 One-Time Costs Funded Outside of the Account: Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account: 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.177 0.000 0.000 0.177 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.177 0.000 0.000 0.177 Grand Total One-Time Implementation Costs 1.250 2.498 1.079 1.346 2.960 0.224 9.357 Recurring Costs: (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs (memo non-add): 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 One-Time Implementation Costs: Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Estimated Land Revenues Budget Request FY 2001 FY 1996-2001 Exhibit BC-02 BRAC Implementation Cost and Savings === page 150 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Camp Pedricktown, NJ (1995) One-Time Savings: Military Construction Family Housing - Construction - Operations Operations & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings: Recurring Savings: Civilian Salary: Military Personnel Entitlements: Officer Salary Enlisted Salary Housing Allowance Overhead: Family Housing Operations Sustainment Recapitalization BOS Other: Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues: FY 1996 FY 1997 FY 1998 FY1999 FY2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.400 0.000 0.000 0.400 0.000 0.000 0.000 0.400 0.000 0.000 0.400 0.000 0.000 0.000 0.400 0.000 0.000 0.400 0.000 0.000 0.000 0.400 0.000 0.000 0.400 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.400 0.400 0.400 0.400 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1.250 2.498 1.079 1.346 2.960 0.224 9.357 Exhibit BC-02 BRAC Implementation Cost and Savings === page 151 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Camp Pedricktown, NJ (1995) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 0.097 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 0.097 0.000 0.000 0.097 0.042 0.000 0.000 0.042 0.142 0.000 0.000 0.142 0.281 0.000 0.000 0.281 0.042 0.000 0.142 0.000 0.281 0.000 Exhibit BC-04 === page 152 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Army/New Jersey/Camp Pedricktown (1995) Closure Package: Close Camp Pedricktown, NJ which consists of approximately 82 acres and 260,000 square feet of facilities. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $0.142 million. Caretaker: None. Exhibit BC-03 === page 153 === TAB 25 === page 154 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. Monmouth, NJ (1993) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request FY 2001 FY 1996-2001 0.000 0.000 0.000 3.855 0.000 0.000 0.000 0.000 3.855 0.000 0.000 3.855 0.000 0.000 0.000 0.017 0.000 0.000 0.000 0.000 0.017 0.000 0.000 0.017 0.000 0.000 0.000 0.034 0.000 0.000 0.000 0.000 0.034 0.000 0.000 0.034 0.000 0.000 0.000 0.071 0.000 0.000 0.000 0.000 0.071 0.000 0.000 0.071 0.000 0.000 0.000 0.075 0.000 0.000 0.000 0.000 0.075 0.000 (0.992) (0.917) 0.000 0.000 0.000 0.021 0.000 0.000 0.000 0.000 0.021 0.000 0.000 0.021 0.000 0.000 0.000 4.073 0.000 0.000 0.000 0.000 4.073 0.000 (0.992) 3.081 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 3.855 0.017 0.034 0.071 (0.917) 0.021 3.081 Exhibit BC-02 BRAC Implementation Cost and Savings === page 155 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. Monmouth, NJ (1993) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.855 0.017 0.034 0.071 (0.917) 0.021 3.081 Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues Exhibit BC-02 BRAC Implementation Cost and Savings === page 156 === FY 2027 Budget Estimates Base Realignment and Closure Account - 2005 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. Monmouth, NJ (2005) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2006-2011 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request 0.000 0.000 0.000 2.082 0.000 0.000 0.000 0.000 2.082 0.000 0.000 2.082 178.000 0.000 0.000 1.124 12.827 0.000 0.018 0.000 191.969 0.000 0.000 191.969 392.319 0.000 0.000 0.690 23.231 0.000 0.598 0.000 416.838 0.000 0.000 416.838 320.120 0.000 0.000 0.998 56.102 0.000 36.605 0.000 413.825 0.000 0.000 413.825 165.790 0.000 0.000 2.389 445.432 0.000 53.177 0.000 666.788 0.000 0.000 666.788 0.000 0.000 0.000 0.098 125.235 0.000 0.710 0.000 126.043 0.000 0.000 126.043 1,056.229 0.000 0.000 7.381 662.827 0.000 91.108 0.000 1,817.545 0.000 0.000 1,817.545 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 42.972 0.000 0.000 42.972 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 42.972 0.000 0.000 42.972 Grand Total One-Time Implementation Costs 2.082 191.969 416.838 456.797 666.788 126.043 1,860.517 Recurring Costs (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs: (memo non-add) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.098 0.000 0.000 0.098 8.565 0.000 0.000 8.565 41.784 0.000 0.000 41.784 60.977 0.000 0.000 60.977 111.424 0.000 0.000 111.424 Exhibit BC-02 BRAC Implementation Cost and Savings === page 157 === FY 2027 Budget Estimates Base Realignment and Closure Account - 2005 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. Monmouth, NJ (2005) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.071 0.000 0.071 0.000 0.000 0.000 0.000 0.796 0.000 0.796 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.867 0.000 0.867 0.000 0.000 0.000 3.651 24.382 42.636 70.669 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.135 0.178 0.000 3.035 6.687 0.416 5.918 13.317 6.369 9.088 20.182 6.785 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.924 9.758 2.093 0.000 12.757 10.006 101.012 0.000 13.089 10.266 103.632 0.000 13.363 10.481 105.917 0.000 40.133 40.511 312.654 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 12.775 0.000 0.000 0.000 127.739 0.000 0.000 0.000 161.507 0.000 0.000 0.000 198.001 0.000 0.000 0.000 500.022 0.000 0.000 12.775 127.810 162.303 198.001 500.889 0 0 0 0 0 0 (86) (6) (120) (52) (132) (127) (338) (185) 2.082 191.969 404.063 328.987 504.485 (71.958) 1,359.628 Exhibit BC-02 BRAC Implementation Cost and Savings === page 158 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Ft. Monmouth, NJ (1993 & 2005) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 4.638 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 4.638 0.000 0.000 4.638 0.651 0.000 0.000 0.651 1.267 0.000 0.000 1.267 6.556 0.000 0.000 6.556 0.651 0.000 1.267 0.000 6.556 0.000 Exhibit BC-04 === page 159 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: 2005) Army/New Jersey/Ft. Monmouth (1993 & Closure/Realignment Package: BRAC 93: Realign Fort Monmouth, NJ. Move CECOM Headquarters out of the leased space and into space at Fort Monmouth, NJ vacated by the 513th Military Intelligence Brigade and the Chaplain School, or other suitable space as appropriate; relocate the Chaplain School to Fort Jackson, SC; consolidate activities to maximize utilization of main post Fort Monmouth, NJ; and dispose of excess facilities and real property at Evans and Charles Woods sub-posts, as well as main post Fort Monmouth, NJ. BRAC 05: a. Close Fort Monmouth, NJ. Relocate the US Army Military Academy Preparatory School to West Point, NY. Relocate the Joint Network Management System Program Office to Fort Meade, MD. Relocate the Budget/Funding, Contracting, Cataloging, Requisition Processing, Customer Services, Item Management, Stock Control, Weapon System Secondary Item Support, Requirements Determination, Integrated Materiel Management Technical Support Inventory Control Point functions for Consumable Items to Defense Supply Center Columbus, OH, and reestablish them as Defense Logistics Agency Inventory Control Point functions; relocate the procurement management and related support functions for Depot Level Reparable to Aberdeen Proving Ground, MD, and designate them as Inventory Control Point functions, detachment of Defense Supply Center Columbus, OH, and relocate the remaining integrated materiel management, user, and related support functions to Aberdeen Proving Ground, MD. Relocate Information Systems, Sensors, Electronic Warfare, and Electronics Research and Development & Acquisition (RDA) to Aberdeen Proving Ground, MD. Relocate the elements of the Program Executive Office for Enterprise Information Systems and consolidate into the Program Executive Office, Enterprise Information Systems at Fort Belvoir, VA. b. Realign Fort Belvoir, VA, by relocating and consolidating Sensors, Electronics, and Electronic Warfare Research, Development and Acquisition activities to Aberdeen Proving Ground, MD, except the Night Vision and Electronic Sensors Directorate (the Night Vision Lab) and the Project Manager Night Vision/Reconnaissance, Surveillance and Target Exhibit BC-03 === page 160 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Acquisition (PM NV/RSTA), and by relocating and consolidating Information Systems Research and Development and Acquisition (except for the Program Executive Office, Enterprise Information Systems) to Aberdeen Proving Ground, MD. c. Realign Army Research Institute, Fort Knox, KY, by relocating Human Systems Research to Aberdeen Proving Ground, MD. d. Realign Redstone Arsenal, AL, by relocating and consolidating Information Systems Development and Acquisition to Aberdeen Proving Ground, MD. e. Realign the PM Acquisition, Logistics and Technology Enterprise Systems and Services (ALTESS) facility at 2511 Jefferson Davis Hwy, Arlington, VA, a leased installation, by relocating and consolidating into the Program Executive Office, Enterprise Information Systems at Fort Belvoir, VA. f. The Secretary of War shall submit a report to the Congressional Committees of Jurisdiction, that movement of Organizations, functions, or activities from Fort Monmouth, NJ to Aberdeen Proving Ground, MD will be accomplished without disruption of their support to the Global War on Terrorism or other critical contingency operations, and that safeguards exist to ensure that necessary redundant capabilities are put in place to mitigate potential degradation of such support, and to ensure maximum retention of critical workforce. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Exhibit BC-03 === page 161 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $1.267 million. Caretaker: None. Exhibit BC-03 === page 162 === TAB 26 === page 163 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. Wingate, NM (1988) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request 0.000 0.000 0.000 2.351 0.097 0.000 0.000 0.000 2.448 0.000 0.000 2.448 0.000 0.000 0.000 1.131 0.083 0.000 0.000 0.000 1.214 0.000 0.000 1.214 0.000 0.000 0.000 35.436 0.174 0.000 0.000 0.000 35.610 0.000 (8.577) 27.033 0.000 0.000 0.000 94.446 0.353 0.000 0.000 0.000 94.799 0.000 (6.239) 88.560 0.000 0.000 0.000 23.241 0.061 0.000 0.000 0.000 23.302 0.000 (0.963) 22.339 0.000 0.000 0.000 86.225 0.348 0.000 0.000 0.000 86.573 0.000 0.000 86.573 0.000 0.000 0.000 242.830 1.116 0.000 0.000 0.000 243.946 0.000 (15.779) 228.167 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 2.448 1.214 27.033 88.560 22.339 86.573 228.167 Exhibit BC-02 BRAC Implementation Cost and Savings === page 164 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. Wingate, NM (1988) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.448 1.214 27.033 88.560 22.339 86.573 228.167 Exhibit BC-02 BRAC Implementation Cost and Savings === page 165 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Ft. Wingate, NM (1988) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 25.554 0.036 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 25.590 0.000 0.000 25.590 15.861 0.000 0.000 15.861 7.854 0.000 0.000 7.854 49.305 0.000 0.000 49.305 15.599 0.262 7.587 0.267 48.740 0.565 Exhibit BC-04 === page 166 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Army/New Mexico/Ft. Wingate (1988) Closure Package: Closure of Fort Wingate, NM. The activities at Fort Wingate, NM will be relocated to Hawthorne Army Ammunition Plant, NV. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $7.587 million. Exhibit BC-03 === page 167 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Caretaker: These funds are for routine maintenance, repair, and utility requirements. Caretaker functions will continue until properties are conveyed. The FY 2027 budget estimate is $0.267 million. Exhibit BC-03 === page 168 === TAB 27 === page 169 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Seneca Army Depot, NY (1995) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request FY 2001 FY 1996-2001 0.000 0.000 0.000 6.046 7.460 0.000 0.000 0.000 13.506 0.000 0.000 13.506 0.000 0.000 0.000 5.620 4.998 0.000 0.000 0.000 10.618 0.000 0.000 10.618 0.000 0.000 0.000 11.553 5.365 0.000 0.000 0.000 16.918 0.000 0.000 16.918 0.000 0.000 0.000 18.489 13.958 0.000 0.000 0.000 32.447 0.000 0.000 32.447 0.000 0.000 0.000 2.683 2.006 0.000 0.000 0.000 4.689 0.000 0.000 4.689 0.000 0.000 0.000 10.518 0.492 0.000 0.000 0.000 11.010 0.000 0.000 11.010 0.000 0.000 0.000 54.909 34.279 0.000 0.000 0.000 89.188 0.000 0.000 89.188 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.045 0.000 0.000 0.045 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.045 0.000 0.000 0.045 Grand Total One-Time Implementation Costs 13.506 10.618 16.963 32.447 4.689 11.010 89.233 Exhibit BC-02 BRAC Implementation Cost and Savings === page 170 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Seneca Army Depot, NY (1995) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 7.315 0.000 0.000 7.315 0.000 0.000 0.000 7.581 0.000 0.000 7.581 0.000 0.000 0.000 15.465 0.000 0.000 15.465 0.000 0.000 0.000 22.287 0.000 0.000 22.287 0.000 0.000 0.000 52.648 0.000 0.000 52.648 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 7.315 7.581 15.465 22.287 52.648 0 0 140 0 190 0 240 0 269 0 269 0 269 0 13.506 10.618 9.648 24.866 (10.776) (11.277) 36.585 Exhibit BC-02 BRAC Implementation Cost and Savings === page 171 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Seneca Army Depot, NY (1995) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 1.658 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 1.658 0.000 0.000 1.658 0.053 0.000 0.000 0.053 0.814 0.000 0.000 0.814 2.525 0.000 0.000 2.525 0.000 0.053 0.760 0.054 2.418 0.107 Exhibit BC-04 === page 172 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Army/New York/Seneca Army Depot (1995) Closure Package: Closure of Seneca Army Depot (SEAD), NY except an enclave to store hazardous material and ores. SEAD, NY closed on 30 September 2000. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2025 budget estimate is $0.760 million. Exhibit BC-03 === page 173 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Caretaker: These funds are for routine maintenance, repair, and utility requirements. Caretaker functions will continue until properties are conveyed. The FY 2027 budget estimate is $0.054 million. Exhibit BC-03 === page 174 === TAB 28 === page 175 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Umatilla Chemical Depot, OR (1988) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request 0.000 0.000 0.000 2.351 0.097 0.000 0.000 0.000 2.448 0.000 0.000 2.448 0.000 0.000 0.000 1.131 0.083 0.000 0.000 0.000 1.214 0.000 0.000 1.214 0.000 0.000 0.000 35.436 0.174 0.000 0.000 0.000 35.610 0.000 (8.577) 27.033 0.000 0.000 0.000 94.446 0.353 0.000 0.000 0.000 94.799 0.000 (6.239) 88.560 0.000 0.000 0.000 23.241 0.061 0.000 0.000 0.000 23.302 0.000 (0.963) 22.339 0.000 0.000 0.000 86.225 0.348 0.000 0.000 0.000 86.573 0.000 0.000 86.573 0.000 0.000 0.000 242.830 1.116 0.000 0.000 0.000 243.946 0.000 (15.779) 228.167 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 2.448 1.214 27.033 88.560 22.339 86.573 228.167 Exhibit BC-02 BRAC Implementation Cost and Savings === page 176 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Umatilla Chemical Depot, OR (1988) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Total One-Time Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2.448 1.214 27.033 88.560 22.339 86.573 228.167 Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues FY 2001 FY 1996-2001 Exhibit BC-02 BRAC Implementation Cost and Savings === page 177 === FY 2027 Budget Estimates Base Realignment and Closure Account - 2005 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Umatilla Chemical Depot, OR (2005) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2006-2011 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request 0.000 0.000 0.000 0.014 0.000 0.000 0.000 0.000 0.014 0.000 0.000 0.014 0.000 0.000 0.000 0.000 0.010 0.000 0.000 0.000 0.010 0.000 0.000 0.010 0.000 0.000 0.000 0.369 0.084 0.000 0.000 0.000 0.453 0.000 0.000 0.453 0.000 0.000 0.000 0.210 0.000 0.000 0.000 0.000 0.210 0.000 0.000 0.210 0.000 0.000 0.000 1.158 0.009 0.000 0.000 0.000 1.167 0.000 0.000 1.167 0.000 0.000 0.000 2.606 11.229 0.000 0.000 0.000 13.835 0.000 0.000 13.835 0.000 0.000 0.000 4.357 11.332 0.000 0.000 0.000 15.689 0.000 0.000 15.689 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.084 0.000 0.000 0.084 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.084 0.000 0.000 0.084 Grand Total One-Time Implementation Costs 0.014 0.010 0.453 0.294 1.167 13.835 15.773 Recurring Costs (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs: (memo non-add) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Exhibit BC-02 BRAC Implementation Cost and Savings === page 178 === FY 2027 Budget Estimates Base Realignment and Closure Account - 2005 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Umatilla Chemical Depot, OR (2005) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.014 0.010 0.453 0.294 1.167 13.835 15.773 Exhibit BC-02 BRAC Implementation Cost and Savings === page 179 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Umatilla Chemical Depot, OR (1988 & 2005) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 0.720 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 0.720 0.000 0.000 0.720 16.170 0.000 0.000 16.170 19.648 0.000 0.000 19.648 36.538 0.000 0.000 36.538 16.170 0.000 19.648 0.000 36.538 0.000 Exhibit BC-04 === page 180 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: (1988 & 2005) Army/Oregon/Umatilla Chemical Depot Closure/Realignment Package: BRAC 88: Realign Umatilla Army Depot, OR. Realign the conventional ammunition workload to Hawthorne Army Ammunition Plant, NV. Retain property and civilian personnel to support the Chemical Demilitarization Program through 1998. BRAC 05: Close Umatilla Chemical Depot, OR, on completion of the chemical demilitarization mission in accordance with Treaty obligations. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Exhibit BC-03 === page 181 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $19.648 million. Caretaker: None. Exhibit BC-03 === page 182 === TAB 29 === page 183 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Letterkenny Army Depot, PA (1991 & 1995) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request FY 2001 FY 1996-2001 0.000 0.000 0.000 2.367 6.800 0.000 0.104 0.000 9.271 0.000 0.000 9.271 0.000 0.000 0.000 1.899 11.942 0.000 2.600 0.000 16.441 0.000 0.000 16.441 0.000 0.000 0.000 7.919 18.642 0.000 2.085 0.000 28.646 0.000 0.000 28.646 1.097 0.000 0.000 3.243 26.742 0.000 0.633 0.000 31.715 0.000 0.000 31.715 6.490 0.000 0.000 2.492 2.798 0.000 0.000 0.000 11.780 0.000 0.000 11.780 0.000 0.000 0.000 4.431 0.288 0.000 0.000 0.000 4.719 0.000 0.000 4.719 7.587 0.000 0.000 22.351 67.212 0.000 5.422 0.000 102.572 0.000 0.000 102.572 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.603 0.000 0.000 0.603 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.603 0.000 0.000 0.603 Grand Total One-Time Implementation Costs 9.271 16.441 29.249 31.715 11.780 4.719 103.175 Exhibit BC-02 BRAC Implementation Cost and Savings === page 184 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Letterkenny Army Depot, PA (1991 & 1995) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 14.777 0.000 0.000 14.777 0.000 0.000 0.000 17.416 0.000 0.000 17.416 0.000 0.000 0.000 40.343 0.000 0.000 40.343 0.000 0.000 0.000 41.273 0.000 0.000 41.273 0.000 0.000 0.000 113.809 0.000 0.000 113.809 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Recurring Savings Civilian Salary: Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total Savings 0.000 0.000 14.777 17.416 40.343 41.273 113.809 62 0 80 2 293 5 293 5 293 5 1,281 5 1,281 5 9.271 16.441 14.472 14.299 (28.563) (36.554) (10.634) Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues Exhibit BC-02 BRAC Implementation Cost and Savings === page 185 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Letterkenny Army Depot, PA (1991 & 1995) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 0.057 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 0.057 0.000 0.000 0.057 0.092 0.000 0.000 0.092 0.093 0.000 0.000 0.093 0.242 0.000 0.000 0.242 0.092 0.000 0.093 0.000 0.242 0.000 Exhibit BC-04 === page 186 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Army/Pennsylvania/Letterkenny Army Depot (1991 & 1995) Realignment Package: BRAC 91: Realign Letterkenny Army Depot, PA by transferring Depot Systems Command and the Systems Integration Management Activity to Rock Island, IL to form the Industrial Operations Command. Additionally, transfer Materiel Readiness Support Activity and the Logistics Control Agency to Redstone Arsenal, AL. This is a revision to the BRAC 88 recommendation, which directed the Material Readiness Support Activity to relocate from Lexington-Bluegrass Army Depot, KY to Letterkenny Army Depot, PA. BRAC 95: Realign Letterkenny Army Depot, PA by transferring the towed and self propelled combat vehicle mission to Anniston Army Depot, AL. Retain an enclave for conventional ammunition storage and tactical missile disassembly and storage. Change the 1993 Commission’s decision regarding the consolidation of tactical missile maintenance at Letterkenny by transferring missile guidance system workload to Tobyhanna Army Depot, PA or private sector commercial activities. Note: This package included funding to disestablish the Defense Distribution Depot, Letterkenny, PA, by relocating to the Defense Distribution Depot-Susquehanna (formerly New Cumberland Army Depot), Susquehanna, PA, and to optimize storage space within the DoW Distribution System. This package also included funding for all BRAC 95 Defense Logistics Agency (DLA) actions supported by Army. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Exhibit BC-03 === page 187 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $0.093 million. Caretaker: None. Exhibit BC-03 === page 188 === TAB 30 === page 189 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Defense Distribution Depot Memphis, TN (1995) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Exhibit BC-02 BRAC Implementation Cost and Savings === page 190 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Defense Distribution Depot Memphis, TN (1995) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Recurring Savings Civilian Salary: Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues Exhibit BC-02 BRAC Implementation Cost and Savings === page 191 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Defense Distribution Depot Memphis, TN (1995) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 0.850 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 0.850 0.000 0.000 0.850 3.431 0.000 0.000 3.431 2.081 0.000 0.000 2.081 6.362 0.000 0.000 6.362 3.431 0.000 2.081 0.000 6.362 0.000 Exhibit BC-04 === page 192 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: (1995) Army/Defense Distribution Depot Memphis Closure Package: Pursuant to a Memorandum of Understanding between the Army and the Defense Logistics Agency (DLA) for the disposal of Army-owned DLA-operated properties, DLA transferred responsibility for the restoration program at the former Defense Distribution Depot Memphis, TN to the Army in 2011. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: None. None. Other: None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Exhibit BC-03 === page 193 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $2.081 million. Caretaker: None. Exhibit BC-03 === page 194 === TAB 31 === page 195 === FY 2027 Budget Estimates Base Realignment and Closure Account - 2005 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Lone Star Army Ammunition Plant, TX (2005) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request FY 2011 FY 2006-2011 0.000 0.000 0.000 1.178 6.101 0.000 0.000 0.000 7.279 0.000 0.000 7.279 0.000 0.000 0.000 3.089 1.296 0.000 0.000 0.000 4.385 0.000 0.000 4.385 3.125 0.000 0.000 0.738 3.916 0.000 0.000 0.000 7.779 0.000 0.000 7.779 0.000 0.000 0.000 3.552 3.060 0.000 11.500 0.000 18.112 0.000 0.000 18.112 0.000 0.000 0.000 37.311 3.933 0.000 0.000 0.000 41.244 0.000 0.000 41.244 0.000 0.000 0.000 0.599 0.926 0.000 0.000 0.000 1.525 0.000 0.000 1.525 3.125 0.000 0.000 46.467 19.232 0.000 11.500 0.000 80.324 0.000 0.000 80.324 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.818 0.000 0.000 1.818 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 1.818 0.000 0.000 1.818 Grand Total One-Time Implementation Costs 7.279 4.385 7.779 19.930 41.244 1.525 82.142 Recurring Costs: (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs: (memo non-add) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Exhibit BC-02 BRAC Implementation Cost and Savings === page 196 === FY 2027 Budget Estimates Base Realignment and Closure Account - 2005 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Lone Star Army Ammunition Plant, TX (2005) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.630 1.369 1.999 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.069 0.000 0.013 0.215 0.000 0.014 0.284 0.000 0.027 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 4.313 0.000 0.004 0.000 4.425 0.000 0.004 0.000 9.600 0.000 6.727 0.000 18.338 0.000 6.735 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 4.317 0.000 0.000 0.000 5.141 0.000 0.000 0.000 17.925 0.000 0.000 0.000 27.383 0.000 0.000 0.000 4.317 5.141 17.925 27.383 0 0 0 0 0 0 0 0 (18) (2) 0 0 (18) (2) 7.279 4.385 7.779 15.613 36.103 (16.400) 54.759 Exhibit BC-02 BRAC Implementation Cost and Savings === page 197 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Lone Star Army Ammunition Plant, TX (2005) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 17.722 0.735 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 18.457 0.000 0.000 18.457 20.162 0.000 0.000 20.162 15.915 0.000 0.000 15.915 54.534 0.000 0.000 54.534 17.761 2.401 13.352 2.563 48.835 5.699 Exhibit BC-04 === page 198 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Plant (2005) Army/Texas/Lone Star Army Ammunition Closure Package: Closure of Lone Star Army Ammunition Plant (AAP), TX. Relocate the Storage and Demilitarization functions to McAlester AAP, OK. Relocate the 105MM and 155MM ICM Artillery, MLRS Artillery, Hand Grenades, 60MM and 81MM Mortars functions to Milan AAP, TN. Relocate Mines and Detonators/Relays/Delays functions to Iowa AAP, IA. Relocate Demolition Charges functions to Crane Army Ammunition Activity (AAA), IN. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Exhibit BC-03 === page 199 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $13.352 million. Caretaker: These funds are for routine maintenance, repair, and utility requirements. Caretaker functions will continue until properties are conveyed. The FY 2027 budget estimate is $2.563 million. Exhibit BC-03 === page 200 === TAB 32 === page 201 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Red River Army Depot, TX (1995) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request FY 2001 FY 1996-2001 0.000 0.000 0.000 0.637 10.174 0.000 0.000 0.000 10.811 0.000 0.000 10.811 0.000 0.000 0.000 1.173 9.723 0.000 0.000 0.000 10.896 0.000 0.000 10.896 0.000 0.000 0.000 2.395 3.230 0.000 0.000 0.000 5.625 0.000 0.000 5.625 0.000 0.000 0.000 1.938 3.022 0.000 0.000 0.000 4.960 0.000 0.000 4.960 0.000 0.000 0.000 1.219 0.301 0.000 0.000 0.000 1.520 0.000 0.000 1.520 0.000 0.000 0.000 3.923 0.000 0.000 0.000 0.000 3.923 0.000 0.000 3.923 0.000 0.000 0.000 11.285 26.450 0.000 0.000 0.000 37.735 0.000 0.000 37.735 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.159 0.000 0.000 0.159 0.000 0.000 0.000 0.163 0.000 0.000 0.163 0.000 0.000 0.000 0.163 0.000 0.000 0.163 0.000 0.000 0.000 0.163 0.000 0.000 0.163 0.000 0.000 0.000 0.648 0.000 0.000 0.648 Grand Total One-Time Implementation Costs 10.811 10.896 5.784 5.123 1.683 4.086 38.383 Exhibit BC-02 BRAC Implementation Cost and Savings === page 202 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Red River Army Depot, TX (1995) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 7.589 0.000 0.000 7.589 0.000 0.000 0.000 8.112 0.000 0.000 8.112 0.000 0.000 0.000 7.513 0.000 0.000 7.513 0.000 0.000 0.000 8.557 0.000 0.000 8.557 0.000 0.000 0.000 31.771 0.000 0.000 31.771 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 7.589 8.112 7.513 8.557 31.771 0 0 133 0 386 0 595 0 595 0 595 0 595 0 10.811 10.896 (1.805) (2.989) (5.830) (4.471) 6.612 Exhibit BC-02 BRAC Implementation Cost and Savings === page 203 === FY 2027 Budget Estimates Base Realignment and Closure Account - 2005 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Red River Army Depot, TX (2005) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request FY 2011 FY 2006-2011 0.000 0.000 0.000 0.249 0.000 0.000 0.000 0.000 0.249 0.000 0.000 0.249 0.000 0.000 0.000 0.062 66.427 0.000 0.000 0.000 66.489 0.000 0.000 66.489 11.842 0.000 0.000 0.170 14.566 0.000 0.000 0.000 26.578 0.000 0.000 26.578 0.000 0.000 0.000 0.976 3.212 0.000 0.089 0.000 4.277 0.000 0.000 4.277 4.250 0.000 0.000 0.116 13.052 0.000 0.000 0.000 17.418 0.000 0.000 17.418 0.000 0.000 0.000 0.096 6.345 0.000 0.000 0.000 6.441 0.000 0.000 6.441 16.092 0.000 0.000 1.669 103.602 0.000 0.089 0.000 121.452 0.000 0.000 121.452 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 22.095 0.000 0.000 22.095 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 22.095 0.000 0.000 22.095 Grand Total One-Time Implementation Costs 0.249 66.489 26.578 26.372 17.418 6.441 143.547 Recurring Costs (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs (memo non-add) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.238 0.000 0.000 0.238 0.530 0.000 0.000 0.530 0.541 0.000 0.000 0.541 1.309 0.000 0.000 1.309 Exhibit BC-02 BRAC Implementation Cost and Savings === page 204 === FY 2027 Budget Estimates Base Realignment and Closure Account - 2005 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Red River Army Depot, TX (2005) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 4.875 4.875 0.000 0.000 0.000 0.000 0.000 4.986 4.986 0.000 0.000 0.000 0.000 0.000 9.861 9.861 0.000 0.000 0.000 1.080 4.993 8.098 14.171 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.756 8.577 0.570 0.000 5.905 8.799 0.585 0.000 6.029 8.984 0.598 0.000 17.691 26.361 1.753 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.512 16.496 0.000 0.000 1.368 21.650 0.000 0.000 1.396 25.105 0.000 0.000 3.275 63.251 0.000 0.000 0.000 16.496 26.525 30.091 73.112 0 0 0 0 0 0 (30) 0 (91) 0 0 0 (121) 0 0.249 66.489 26.578 9.876 (9.107) (23.650) 70.435 Exhibit BC-02 BRAC Implementation Cost and Savings === page 205 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Red River Army Depot, TX (1995 & 2005) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 0.881 0.016 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 0.897 0.000 0.000 0.897 0.250 0.000 0.000 0.250 0.546 0.000 0.000 0.546 1.693 0.000 0.000 1.693 0.227 0.023 0.534 0.012 1.642 0.051 Exhibit BC-04 === page 206 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: 2005) Army/Texas/Red River Army Depot (1995 & Realignment Package: BRAC 95: Realign Red River Army Depot, TX, by moving all maintenance missions, except for that related to the Bradley Fighting Vehicle Series to other depot maintenance activities including the private sector. Retain the conventional ammunition storage, intern training center, Rubber Production Facility, and civilian training education at Red River, TX. BRAC 05: Realign Red River Army Depot, TX. Relocate the storage and demilitarization functions of the Munitions Center to McAlester Army Ammunition Plant (AAP), OK. Relocate the munitions maintenance functions of the Munitions Center to McAlester AAP, OK, and Blue Grass Army Depot (AD), KY. Relocate the depot maintenance of Tactical Missiles to Letterkenny AD, PA. Disestablish the supply, storage, and distribution functions for tires, packaged Petroleum, Oil, and Lubricants, and compressed gases. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: Family Housing Operations: None. None. Exhibit BC-03 === page 207 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Operation and Maintenance: Military Personnel: Other: None. None. None. Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $0.534 million. Caretaker: These funds are for routine maintenance, repair, and utility requirements. Caretaker functions will continue until properties are conveyed. The FY 2027 budget estimate is $0.012 million. Exhibit BC-03 === page 208 === TAB 33 === page 209 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Defense Distribution Depot Ogden, UT (1995) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Exhibit BC-02 BRAC Implementation Cost and Savings === page 210 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Defense Distribution Depot Ogden, UT (1995) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Exhibit BC-02 BRAC Implementation Cost and Savings === page 211 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Defense Distribution Depot Ogden, UT (1995) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 2.827 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 2.827 0.000 0.000 2.827 0.474 0.000 0.000 0.474 0.038 0.000 0.000 0.038 3.339 0.000 0.000 3.339 0.474 0.000 0.038 0.000 3.339 0.000 Exhibit BC-04 === page 212 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Ogden (1995) Army/Utah/Defense Distribution Depot Closure Package: Pursuant to a Memorandum of Understanding between the Army and the Defense Logistics Agency (DLA) for the disposal of Army-owned DLA-operated properties, DLA transferred responsibility for the restoration program at the former Defense Distribution Depot Ogden, UT in 2002 to the Army. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Exhibit BC-03 === page 213 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $0.038 million. Caretaker: None. Exhibit BC-03 === page 214 === TAB 34 === page 215 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Tooele Army Depot, UT (1993) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request FY 2001 FY 1996-2001 0.000 0.000 0.000 3.855 0.000 0.000 0.000 0.000 3.855 0.000 0.000 3.855 0.000 0.000 0.000 0.017 0.000 0.000 0.000 0.000 0.017 0.000 0.000 0.017 0.000 0.000 0.000 0.034 0.000 0.000 0.000 0.000 0.034 0.000 0.000 0.034 0.000 0.000 0.000 0.071 0.000 0.000 0.000 0.000 0.071 0.000 0.000 0.071 0.000 0.000 0.000 0.075 0.000 0.000 0.000 0.000 0.075 0.000 (0.992) (0.917) 0.000 0.000 0.000 0.021 0.000 0.000 0.000 0.000 0.021 0.000 0.000 0.021 0.000 0.000 0.000 4.073 0.000 0.000 0.000 0.000 4.073 0.000 (0.992) 3.081 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 3.855 0.017 0.034 0.071 (0.917) 0.021 3.081 Exhibit BC-02 BRAC Implementation Cost and Savings === page 216 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Tooele Army Depot, UT (1993) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Recurring Savings Civilian Salary: Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.855 0.017 0.034 0.071 (0.917) 0.021 3.081 Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues Exhibit BC-02 BRAC Implementation Cost and Savings === page 217 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Tooele Army Depot, UT (1993) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 2.715 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 2.715 0.000 0.000 2.715 0.991 0.000 0.000 0.991 0.316 0.000 0.000 0.316 4.022 0.000 0.000 4.022 0.991 0.000 0.316 0.000 4.022 0.000 Exhibit BC-04 === page 218 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Army/Utah/Tooele Army Depot (1993) Realignment Package: Realign Tooele Army Depot (TEAD), UT by reducing it to a depot activity and placing it under the command and control of Red River Army Depot, TX. Retain conventional ammunition storage and the chemical demilitarization mission. The depot workload will move to other depot maintenance activities, including the private sector. The activities of the depot not associated with the remaining mission will be inactivated, transferred or eliminated, as appropriate. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Exhibit BC-03 === page 219 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $0.316 million. Caretaker: None. Exhibit BC-03 === page 220 === TAB 35 === page 221 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Army Research Laboratory, Woodbridge, VA (1991) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request 0.000 0.000 0.000 3.407 0.000 0.000 0.000 0.000 3.407 0.000 0.000 3.407 0.000 0.000 0.000 0.935 0.000 0.000 0.000 0.000 0.935 0.000 0.000 0.935 0.000 0.000 0.000 37.604 0.000 0.000 0.000 0.000 37.604 0.000 (3.964) 33.640 0.000 0.000 0.000 60.616 0.872 0.000 0.000 0.000 61.488 0.000 (2.800) 58.688 0.000 0.000 0.000 17.359 0.000 0.000 0.000 0.000 17.359 0.000 (1.128) 16.231 0.000 0.000 0.000 57.096 0.723 0.000 0.000 0.000 57.819 0.000 0.000 57.819 0.000 0.000 0.000 177.017 1.595 0.000 0.000 0.000 178.612 0.000 (7.892) 170.720 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 3.407 0.935 33.640 58.688 16.231 57.819 170.720 Exhibit BC-02 BRAC Implementation Cost and Savings === page 222 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Army Research Laboratory, Woodbridge, VA (1991) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.407 0.935 33.640 58.688 16.231 57.819 170.720 Exhibit BC-02 BRAC Implementation Cost and Savings === page 223 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Army Research Laboratory, Woodbridge, VA (1991) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 0.036 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 0.036 0.000 0.000 0.036 0.134 0.000 0.000 0.134 0.069 0.000 0.000 0.069 0.239 0.000 0.000 0.239 0.134 0.000 0.069 0.000 0.239 0.000 Exhibit BC-04 === page 224 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Woodbridge (1991) Army/Virginia/Army Research Laboratory Closure Package: Move the Harry Diamond Laboratories Woodbridge, VA Research Facility element to the Army Research Laboratory, Adelphi, MD and close/dispose of the Woodbridge, VA facility. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Exhibit BC-03 === page 225 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Continuing Environmental and Caretaker Costs: Environmental: Continued funding of long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $0.069 million. Caretaker: None. Exhibit BC-03 === page 226 === TAB 36 === page 227 === FY 2027 Budget Estimates Base Realignment and Closure Account - 2005 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. Monroe, VA (2005) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2006-2011 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request 0.000 0.000 0.000 0.977 0.000 0.000 0.000 0.000 0.977 0.000 0.000 0.977 0.000 0.000 0.000 0.305 0.091 0.000 0.006 0.000 0.402 0.000 0.000 0.402 0.000 0.000 0.000 1.290 0.742 0.000 0.000 0.000 2.032 0.000 0.000 2.032 90.321 0.000 0.000 5.684 7.610 0.000 5.757 0.000 109.372 0.000 0.000 109.372 34.623 0.000 0.000 0.791 20.442 0.000 71.692 0.000 127.548 0.000 0.000 127.548 0.000 0.000 0.000 1.704 25.403 0.000 4.892 0.000 31.999 0.000 0.000 31.999 124.944 0.000 0.000 10.751 54.288 0.000 82.347 0.000 272.330 0.000 0.000 272.330 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.557 0.000 0.000 0.557 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.557 0.000 0.000 0.557 Grand Total One-Time Implementation Costs 0.977 0.402 2.032 109.929 127.548 31.999 272.887 Recurring Costs (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs: (memo non-add) 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.526 0.000 0.000 2.526 11.075 0.000 0.000 11.075 11.309 0.000 0.000 11.309 24.910 0.000 0.000 24.910 Exhibit BC-02 BRAC Implementation Cost and Savings === page 228 === FY 2027 Budget Estimates Base Realignment and Closure Account - 2005 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. Monroe, VA (2005) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.049 0.000 0.049 0.000 0.000 0.000 0.000 0.472 0.000 0.472 0.000 0.000 0.000 0.000 0.521 0.000 0.521 0.000 0.000 0.000 0.000 0.000 11.052 11.052 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 2.449 3.916 1.414 2.449 3.916 1.414 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.031 0.124 5.232 0.170 0.679 2.196 5.342 14.439 0.710 2.320 10.574 14.609 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 5.557 0.000 0.000 0.000 41.487 0.000 0.000 0.000 47.044 0.000 0.000 0.000 0.000 5.606 41.959 47.565 0 0 0 0 0 0 0 0 0 0 (301) (257) (301) (257) 0.977 0.402 2.032 109.929 121.942 (9.960) 225.322 Exhibit BC-02 BRAC Implementation Cost and Savings === page 229 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Ft. Monroe, VA (2005) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 1.278 0.422 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 1.700 0.000 0.000 1.700 2.413 0.000 0.000 2.413 1.450 0.000 0.000 1.450 5.563 0.000 0.000 5.563 1.980 0.433 1.008 0.442 4.266 1.297 Exhibit BC-04 === page 230 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Army/Virginia/Ft. Monroe (2005) Closure Package: Close Fort Monroe, VA, and relocate the US Army Training & Doctrine Command (TRADOC) Headquarters, the Installation Management Command (IMCOM) Northeast Region Headquarters, the US Army Network Enterprise Technology Command (NETCOM) Northeast Region Headquarters and the Army Contracting Agency Northern Region Office to Fort Eustis, VA. Relocate the US Army Accessions Command and US Army Cadet Command to Fort Knox, KY. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Exhibit BC-03 === page 231 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) Continuing Environmental and Caretaker Costs: Environmental: Continued funding of environmental remedial actions and long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $1.008 million. Caretaker: These funds are for routine maintenance, repair, and utility requirements. Caretaker functions will continue until properties are conveyed. The FY 2027 budget estimate is $0.442 million. Exhibit BC-03 === page 232 === TAB 37 === page 233 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. Pickett, VA (1995) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request 0.000 0.000 0.000 1.114 1.235 0.000 0.000 0.000 2.349 0.000 0.000 2.349 0.000 0.000 0.000 1.768 2.253 0.000 0.000 0.000 4.021 0.000 0.000 4.021 0.000 0.000 0.000 2.642 0.056 0.000 0.000 0.000 2.698 0.000 0.000 2.698 2.696 0.000 0.000 3.190 0.626 0.000 0.000 0.000 6.512 0.000 0.000 6.512 0.000 0.000 0.000 1.484 0.020 0.000 0.000 0.000 1.504 0.000 0.000 1.504 0.000 0.000 0.000 1.300 8.235 0.000 0.000 0.000 9.535 0.000 0.000 9.535 2.696 0.000 0.000 11.498 12.425 0.000 0.000 0.000 26.619 0.000 0.000 26.619 One-Time Costs Funded Outside of the Account: Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.020 0.000 0.000 0.020 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.020 0.000 0.000 0.020 Grand Total One-Time Implementation Costs 2.349 4.041 2.698 6.512 1.504 9.535 26.639 Exhibit BC-02 BRAC Implementation Cost and Savings === page 234 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Ft. Pickett, VA (1995) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 4.688 0.000 0.000 4.688 0.000 0.000 0.088 4.789 0.000 0.000 4.877 0.000 0.000 0.088 4.894 0.000 0.000 4.982 0.000 0.000 0.088 6.907 0.000 0.000 6.995 0.000 0.000 0.264 21.278 0.000 0.000 21.542 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total Savings 0.000 0.000 4.688 4.877 4.982 6.995 21.542 0 0 267 0 267 0 267 0 267 0 267 0 267 0 2.349 4.041 (1.990) 1.635 (3.478) 2.540 5.097 Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues Exhibit BC-02 BRAC Implementation Cost and Savings === page 235 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Ft. Pickett, VA (1995) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 0.252 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 0.252 0.000 0.000 0.252 0.124 0.000 0.000 0.124 0.282 0.000 0.000 0.282 0.658 0.000 0.000 0.658 0.124 0.000 0.282 0.000 0.658 0.000 Exhibit BC-04 === page 236 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Army/Virginia/Ft. Pickett (1995) Closure Package: Close Fort Pickett, VA, except minimum essential ranges, facilities, and training areas as a Reserve Component training enclave to permit the conduct of individual and annual training. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Continuing Environmental and Caretaker Costs: Environmental: Continued funding of long term monitoring is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $0.282 million. Caretaker: None. Exhibit BC-03 === page 237 === TAB 38 === page 238 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Vint Hill Farms, VA (1993) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request 0.000 0.000 0.000 3.855 0.000 0.000 0.000 0.000 3.855 0.000 0.000 3.855 0.000 0.000 0.000 0.017 0.000 0.000 0.000 0.000 0.017 0.000 0.000 0.017 0.000 0.000 0.000 0.034 0.000 0.000 0.000 0.000 0.034 0.000 0.000 0.034 0.000 0.000 0.000 0.071 0.000 0.000 0.000 0.000 0.071 0.000 0.000 0.071 0.000 0.000 0.000 0.075 0.000 0.000 0.000 0.000 0.075 0.000 (0.992) (0.917) 0.000 0.000 0.000 0.021 0.000 0.000 0.000 0.000 0.021 0.000 0.000 0.021 0.000 0.000 0.000 4.073 0.000 0.000 0.000 0.000 4.073 0.000 (0.992) 3.081 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 3.855 0.017 0.034 0.071 (0.917) 0.021 3.081 Exhibit BC-02 BRAC Implementation Cost and Savings === page 239 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Vint Hill Farms, VA (1993) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3.855 0.017 0.034 0.071 (0.917) 0.021 3.081 Exhibit BC-02 BRAC Implementation Cost and Savings === page 240 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Vint Hill Farms, VA (1993) BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 1.200 0.000 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 1.200 0.000 0.000 1.200 0.000 0.000 0.000 0.000 0.054 0.000 0.000 0.054 1.254 0.000 0.000 1.254 0.000 0.000 0.054 0.000 1.254 0.000 Exhibit BC-04 === page 241 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Army/Virginia/Vint Hill Farms (1993) Closure Package: Close Vint Hill Farms, VA. Vint Hill Farms, VA was closed in 1997 and the last property was transferred in 2002. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Continuing Environmental and Caretaker Costs: Environmental: Long term monitoring continues and is required to comply with all applicable environmental laws and regulations. The FY 2027 budget estimate is $0.054 million. Caretaker: None. Exhibit BC-03 === page 242 === TAB 39 === page 243 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Program Management (1995) FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request 25.887 0.000 0.000 7.667 7.887 0.000 0.000 0.000 41.441 0.000 0.000 41.441 7.921 0.000 0.000 8.096 5.673 0.000 0.000 0.000 21.690 0.000 0.000 21.690 5.733 0.000 0.000 17.933 12.409 0.000 0.000 0.000 36.075 0.000 0.000 36.075 0.871 0.000 0.000 21.157 10.304 0.000 0.000 0.000 32.332 0.000 0.000 32.332 0.000 0.000 0.000 21.789 9.131 0.000 0.000 0.000 30.920 0.000 0.000 30.920 0.000 0.000 0.000 15.022 4.905 0.000 0.000 0.000 19.927 0.000 0.000 19.927 40.412 0.000 0.000 91.664 50.309 0.000 0.000 0.000 182.385 0.000 0.000 182.385 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 14.358 0.000 0.000 14.358 0.000 0.000 0.000 13.916 0.000 0.000 13.916 0.000 0.000 0.000 16.104 0.000 0.000 16.104 0.000 0.000 0.000 1.150 0.000 0.000 1.150 0.000 0.000 0.000 0.975 0.000 0.000 0.975 0.000 0.000 0.000 0.900 0.000 0.000 0.900 0.000 0.000 0.000 47.403 0.000 0.000 47.403 Grand Total One-Time Implementation Costs 55.799 35.606 52.179 33.482 31.895 20.827 229.788 Exhibit BC-02 BRAC Implementation Cost and Savings === page 244 === FY 2027 Budget Estimates Base Realignment and Closure Account - 1995 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Program Management (1995) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Civilian ES Military ES Net Implementation Costs Less Estimated Land Revenues FY 1996 FY 1997 FY 1998 FY 1999 FY 2000 FY 2001 FY 1996-2001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 55.799 35.606 52.179 33.482 31.895 20.827 229.788 Exhibit BC-02 BRAC Implementation Cost and Savings === page 245 === FY 2027 Budget Estimates Base Realignment and Closure Account - 2005 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Program Management (2005) FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 84.182 0.000 0.000 3.685 24.072 0.000 0.000 0.000 111.939 0.000 0.000 111.939 250.825 0.000 0.000 1.909 36.348 0.000 0.000 0.000 289.082 0.000 0.000 289.082 157.155 0.000 0.000 2.359 21.761 0.000 0.000 0.000 181.275 0.000 0.000 181.275 103.148 0.000 0.000 2.423 20.877 0.000 0.000 0.000 126.448 0.000 0.000 126.448 26.100 0.000 0.000 7.524 80.230 0.000 0.000 0.000 113.854 0.000 0.000 113.854 0.000 0.000 0.000 1.485 23.140 0.000 0.000 0.000 24.625 0.000 0.000 24.625 621.410 0.000 0.000 19.385 206.428 0.000 0.000 0.000 847.223 0.000 0.000 847.223 One-Time Costs Funded Outside of the Account Military Construction Family Housing Environmental Operation & Maintenance Other Homeowners Assistance Program Total One-Time Cost Outside of the Account 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Grand Total One-Time Implementation Costs 111.939 289.082 181.275 126.448 113.854 24.625 847.223 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 One-Time Implementation Costs Military Construction Family Housing - Construction - Operations Environmental Operation & Maintenance Military Personnel - PCS Other Homeowners Assistance Program Total One-Time Costs Homeowners Assistance Program Revenues From Land Sales (-) Budget Authority Request Recurring Costs (memo non-add) Operation & Maintenance Military Personnel Other Total Recurring Costs (memo non-add) FY 2011 FY 2006-2011 Exhibit BC-02 BRAC Implementation Cost and Savings === page 246 === FY 2027 Budget Estimates Base Realignment and Closure Account - 2005 Cost and Savings by Fiscal Year (Dollars in Millions) ARMY/Program Management (2005) One-Time Savings Military Construction Family Housing - Construction - Operations Operation & Maintenance Military PCS Cost Avoidance Other Total One-Time Savings Recurring Savings Civilian Salary Military Personnel Entitlements Officer Salary Enlisted Salary Housing Allowance Overhead Family Housing Operations Sustainment Recapitalization BOS Other Procurement Mission Activity Miscellaneous Total Recurring Savings Grand Total Savings Net Civilian Manpower Position Changes (+/-) Net Military Manpower Position Changes (+/-) Net Implementation Costs Less Estimated Land Revenues FY 2006 FY 2007 FY 2008 FY 2009 FY 2010 FY 2011 FY 2006-2011 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 111.939 289.082 181.275 126.448 113.854 24.625 847.223 Exhibit BC-02 BRAC Implementation Cost and Savings === page 247 === FY 2027 Budget Estimates Base Realignment and Closure Account Environmental and Caretaker Costs by Fiscal Year (Dollars in Millions) ARMY/Program Management BRAC Continuing Environmental and Caretaker Costs ARMY Environmental FY 2025 FY 2027 FY 2025-2027 Operation & Maintenance 4.731 11.213 FY 2026 Total Obligation Authority Revenues from Land Sales (-) Prior Year Financing Budget Authority 15.944 0.000 0.000 15.944 19.492 0.000 0.000 19.492 24.365 0.000 0.000 24.365 59.801 0.000 0.000 59.801 10.708 8.784 12.220 12.145 27.659 32.142 Exhibit BC-04 === page 248 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION Army/Location/Package: Army/Program Management Closure/Realignment Package: Program management and planning and design costs associated with all Army BRAC actions. One-Time Implementation Costs: Military Construction: None. Conjunctively-Funded Construction: Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. None. Revenues from Land Sales: None. Savings: Military Construction: None. Family Housing Construction: None. Family Housing Operations: None. Operation and Maintenance: None. Military Personnel: Other: None. None. Continuing Environmental and Caretaker Costs: Environmental: Costs include program management requirement associated with the execution of environmental restoration for all BRAC rounds (1988, 1991, 1993, 1995, and 2005) at the U.S. Army Corps of Engineers and the U.S. Army Environmental Center. Funding requirements relate to Restoration Advisory Board (RAB), Defense and State Memorandum of Agreements (DSMOA), and manpower Exhibit BC-03 === page 249 === BASE REALIGNMENT AND CLOSURE PACKAGE DESCRIPTION (Continued) requirements. The FY 2027 budget estimate is $12.220 million. Operation and Maintenance: Costs identified in this package are required by the U.S. Army Corps of Engineers for reimbursement costs associated with the management of BRAC real estate, and other program management requirements. The FY 2027 budget estimate is $12.145 million. Exhibit BC-03