=== page 1 === UNCLASSIFIED Department of War Fiscal Year (FY) 2027 Budget Estimates April 2026 Air Force Justification Book Volume 1 of 1 Other Procurement, Air Force UNCLASSIFIED === page 2 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED === page 3 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Table of Volumes Air Force - 3080................................................................................................................................................................. Volume 1 UNCLASSIFIED Volume 1 - i === page 4 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - ii === page 5 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Volume 1 Table of Contents Introduction and Explanation of Contents................................................................................................................Volume 1 - v Comptroller Exhibit P-1.............................................................................................................................................Volume 1 - vii Master Line Item Table of Contents (by Appropriation then Line Number)....................................................... Volume 1 - xvii Master Line Item Table of Contents (Alphabetically by Line Item Title)............................................................Volume 1 - xxiii Executive Summary...............................................................................................................................................Volume 1 - xxvii Acronyms................................................................................................................................................................ Volume 1 - xxix Exhibit P-40s................................................................................................................................................................ Volume 1 - 1 UNCLASSIFIED Volume 1 - iii === page 6 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - iv === page 7 === UNCLASSIFIED Appropriation Language Fiscal Year (FY) 2027 President’s Budget Other Procurement, Air Force For procurement and modification of equipment (including ground guidance and electronic control equipment, and ground electronic and communication equipment), and supplies, materials, and spare parts therefor, not otherwise provided for; the purchase of passenger motor vehicles for replacement only; lease of passenger motor vehicles; and expansion of public and private plants, Government-owned equipment and installation thereof in such plants, erection of structures, and acquisition of land, for the foregoing purposes, and such lands and interests therein, may be acquired, and construction prosecuted thereon, prior to approval of title; reserve plant and Government and contractorowned equipment layaway, $39,199,963,000, to remain available for obligation until September 30, 2029, of which $52,672,000 shall be available for the Air National Guard and the Air Force Reserve. UNCLASSIFIED Volume 1 - v === page 8 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - vi === page 9 === UNCLASSIFIED Department Of War FY 2027 President's Budget Exhibit P-1 Total Obligation Authority DoW Component Summary (Dollars in Thousands) FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total Appropriation Summary FY 2025 Actuals Other Procurement, Air Force 31,035,504 32,605,147 448,300 33,053,447 39,199,963 39,199,963 Total Department of the Air Force 31,035,504 32,605,147 448,300 33,053,447 39,199,963 39,199,963 Grand Total Department Of War 31,035,504 32,605,147 448,300 33,053,447 39,199,963 39,199,963 UNCLASSIFIED Volume 1 - vii === page 10 === UNCLASSIFIED Department Of the Air Force FY 2027 President's Budget Exhibit P-1 Total Obligation Authority Air Force Summary (Dollars in Thousands) FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total FY 2027 Discretionary Request FY 2027 Mandatory Request Appropriation Summary FY 2025 Actuals Other Procurement, Air Force 31,035,504 32,605,147 448,300 33,053,447 39,199,963 39,199,963 31,035,504 32,605,147 448,300 33,053,447 39,199,963 39,199,963 Total Department of the Air Force UNCLASSIFIED FY 2027 Total Volume 1 - viii === page 11 === UNCLASSIFIED Department Of the Air Force FY 2027 President's Budget Exhibit P-1 Total Obligation Authority 3080F Budget Activity Summary (Dollars in Thousands) Appropriation: Other Procurement, Air Force FY 2025 Actuals FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total Budget Activity 02. Vehicular equipment 414,868 319,665 30,000 349,665 545,328 545,328 03. Electronics and telecommunications equipment 2,417,312 2,158,338 130,300 2,288,638 5,048,242 5,048,242 04. Other base maintenance and support equipment 28,195,250 30,111,720 288,000 30,399,720 33,583,607 33,583,607 15,424 22,786 22,786 448,300 33,053,447 39,199,963 39,199,963 05. Spare and repair parts Total Other Procurement, Air Force 8,074 15,424 31,035,504 32,605,147 UNCLASSIFIED Volume 1 - ix === page 12 === UNCLASSIFIED Department Of the Air Force FY 2027 President's Budget Exhibit P-1 Total Obligation Authority 3080F Detail (Dollars in Thousands) Appropriation: 3080 Other Procurement, Air Force Line No Item Nomenclature FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals Ident Code Qty Cost Qty Cost Qty Cost FY 2026 Total Qty Cost FY 2027 Discretionary Request FY 2027 Mandatory Request Qty Qty Cost Cost FY 2027 Total Qty Cost Budget Activity 02: Vehicular equipment Passenger Carrying Vehicles 1 Passenger Carrying Vehicles A 6,677 5,557 5,557 Cargo and Utility Vehicles 2 Medium Tactical Vehicle A 5,248 3,938 3,938 3 Cap Vehicles A 2,000 3,300 3,300 4 Cargo and Utility Vehicles A 70,873 57,155 600 57,755 Special Purpose Vehicles 5 Joint Light Tactical Vehicle A 59,483 62,202 62,202 6 Security And Tactical Vehicles A 438 129 129 7 Special Purpose Vehicles A 92,982 69,408 A 57,234 59,498 A 18,359 18,722 7,400 26,122 7,000 103,304 103,304 2,132 2,132 76,408 Fire Fighting Equipment 8 Fire Fighting/Crash Rescue Vehicles 59,498 Materials Handling Equipment 9 Materials Handling Vehicles Base Maintenance Support 10 Runway Snow Remov And Cleaning Equ A 8,780 11,045 1,000 12,045 11 Base Maintenance Support Vehicles A 92,686 28,711 14,000 42,711 Mission Support Vehicles UNCLASSIFIED Volume 1 - x === page 13 === UNCLASSIFIED Department Of the Air Force FY 2027 President's Budget Exhibit P-1 Total Obligation Authority 3080F Detail (Dollars in Thousands) Appropriation: 3080 Other Procurement, Air Force Line No Item Nomenclature 12 FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals Ident Code Qty Cost Qty Cost Qty Cost FY 2026 Total Qty Cost Mission Support Vehicles FY 2027 Discretionary Request FY 2027 Mandatory Request Qty Qty Cost Cost FY 2027 Total Qty Cost 439,892 439,892 349,665 545,328 545,328 123,850 123,850 374,613 374,613 Cancelled Account Adjustments 13 Cancelled Account Adjustments (Bpa A Total Vehicular equipment 108 414,868 319,665 30,000 Budget Activity 03: Electronics and telecommunications equipment Comm Security Equipment(Comsec) 14 Comsec Equipment A 75,880 15 STRATEGIC MICROELECTRONIC SUPPLY SYSTEM A 313,667 Intelligence Programs 16 International Intel Tech & Architectures A 5,616 5,833 5,833 19,060 19,060 17 Intelligence Training Equipment A 5,146 5,273 5,273 5,531 5,531 18 Intelligence Comm Equipment A 36,449 36,428 36,428 37,717 37,717 58,313 58,313 Electronics Programs 19 Air Traffic Control & Landing Sys A 43,820 26,390 26,390 20 National Airspace System A 13,443 11,810 11,810 21 Battle Control System - Fixed 13,658 16,592 16,592 3,391 3,391 22 Theater Air Control Sys Improvemen A 56,143 27,650 27,650 11,640 11,640 23 3D Expeditionary Long-Range Radar A 96,022 103,226 103,226 430,607 430,607 UNCLASSIFIED Volume 1 - xi === page 14 === UNCLASSIFIED Department Of the Air Force FY 2027 President's Budget Exhibit P-1 Total Obligation Authority 3080F Detail (Dollars in Thousands) Appropriation: 3080 Other Procurement, Air Force Line No Item Nomenclature FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals Ident Code Qty Cost Qty Cost Qty Cost FY 2026 Total Qty Cost FY 2027 Discretionary Request FY 2027 Mandatory Request Qty Qty Cost Cost FY 2027 Total Qty Cost 24 Weather Observation Forecast A 31,056 31,516 31,516 33,111 33,111 25 Strategic Command And Control A 53,480 82,912 82,912 89,931 89,931 26 Cheyenne Mountain Complex A 8,028 22,021 22,021 7,434 7,434 27 Mission Planning Systems A 18,474 18,722 18,722 23,927 23,927 28 Strategic Mission Planning & Execution System A 7,376 6,383 6,383 9,435 9,435 234,417 234,417 1,770,698 1,770,698 17,641 17,641 Spcl Comm-Electronics Projects 29 General Information Technology A 161,928 172,085 172,085 30 Af Global Command & Control Sys A 1,946 1,947 1,947 31 Battlefield Airborne Control Node (BACN) A 5 32 Mobility Command And Control A 11,435 11,648 11,648 33 Air Force Physical Security System A 381,317 314,365 34 Samtec Communications A 35 Combat Training Ranges A 286,432 158,396 158,396 94,378 94,378 36 Minimum Essential Emergency Comm N A 55,317 51,463 51,463 279,516 279,516 37 Wide Area Surveillance (WAS) A 13,945 29,617 29,617 17,000 17,000 38 C3 Countermeasures A 90,347 116,410 116,410 163,127 163,127 39 Defense Enterprise Accounting & Mgt Sys A 698 698 40 Theater Battle Mgt C2 System A 442 442 460 460 433 96,900 UNCLASSIFIED 411,265 Volume 1 - xii === page 15 === UNCLASSIFIED Department Of the Air Force FY 2027 President's Budget Exhibit P-1 Total Obligation Authority 3080F Detail (Dollars in Thousands) Appropriation: 3080 Other Procurement, Air Force Line No Item Nomenclature 41 Air & Space Operations Center (AOC) FY 2025 Actuals Ident Code Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost FY 2027 Discretionary Request FY 2027 Mandatory Request Qty Qty Cost Cost FY 2027 Total Qty Cost A 20,545 22,785 22,785 23,778 23,778 Air Force Communications 42 Base Information Transpt Infrast (BITI) Wired A 50,320 79,091 79,091 125,702 125,702 43 AFNET A 132,507 282,907 282,907 325,839 325,839 44 Joint Communications Support Element (JCSE) A 5,821 5,930 5,930 16,267 16,267 45 USCENTCOM A 20,698 14,919 14,919 15,328 15,328 46 USSTRATCOM A 4,797 4,788 4,788 5,013 5,013 47 USSPACECOM A 79,783 32,633 32,633 195,370 195,370 139,076 145,829 177,829 162,835 162,835 80,321 80,321 50,730 36,874 36,874 1,400 68,415 158,113 158,113 76,034 220,855 220,855 130,300 2,288,638 5,048,242 5,048,242 Organization and Base 48 Tactical C-E Equipment A 49 Next Generation Survival Radio (NGSR) A 50 Combat Survivor Evader Locater A 1,778 51 Radio Equipment A 43,512 50,730 52 Base Comm Infrastructure A 63,965 67,015 32,000 Modifications 53 Comm Elect Mods A Total Electronics and telecommunications equipment 73,147 76,034 2,417,312 2,158,338 Budget Activity 04: Other base maintenance and support equipment Personal Safety & Rescue Equip UNCLASSIFIED Volume 1 - xiii === page 16 === UNCLASSIFIED Department Of the Air Force FY 2027 President's Budget Exhibit P-1 Total Obligation Authority 3080F Detail (Dollars in Thousands) Appropriation: 3080 Other Procurement, Air Force Line No Item Nomenclature 54 FY 2025 Actuals Ident Code Personal Safety and Rescue Equipment Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost FY 2027 Discretionary Request FY 2027 Mandatory Request Qty Qty Cost Cost FY 2027 Total Qty Cost A 109,595 81,782 81,782 87,994 87,994 Depot Plant+Mtrls Handling Eq 55 POWER CONDITIONING EQUIPMENT A 13,443 13,711 13,711 14,444 14,444 56 Mechanized Material Handling Equip A 20,459 21,928 21,928 24,594 24,594 Base Support Equipment 57 Base Procured Equipment A 75,054 109,592 109,592 81,686 81,686 58 Engineering and EOD Equipment A 203,531 258,799 258,799 247,989 247,989 59 Mobility Equipment A 69,528 126,200 41,000 167,200 288,930 288,930 60 Fuels Support Equipment (FSE) A 24,563 34,794 29,000 63,794 81,066 81,066 61 Base Maintenance and Support Equipment A 58,105 97,431 97,431 68,127 68,127 Special Support Projects 63 DARP RC135 A 29,524 30,136 30,136 31,496 31,496 64 DCGS-AF A 51,594 87,044 87,044 316,157 316,157 66 Special Update Program A 1,518,290 1,282,297 218,000 1,500,297 5,099,420 5,099,420 27,968,006 27,241,704 27,241,704 288,000 30,399,720 33,583,607 33,583,607 1,075 8,657 8,657 Classified Programs 999 Classified Programs Total Other base maintenance and support equipment 26,021,564 27,968,006 28,195,250 30,111,720 1,056 1,075 Budget Activity 05: Spare and repair parts Spares and Repair Parts 67 Spares and Repair Parts (Cyber) A UNCLASSIFIED Volume 1 - xiv === page 17 === UNCLASSIFIED Department Of the Air Force FY 2027 President's Budget Exhibit P-1 Total Obligation Authority 3080F Detail (Dollars in Thousands) Appropriation: 3080 Other Procurement, Air Force Line No Item Nomenclature 68 Spares And Repair Parts Total Spare and repair parts Total Other Procurement, Air Force FY 2025 Actuals Ident Code A Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost FY 2027 Discretionary Request FY 2027 Mandatory Request Qty Qty Cost Cost FY 2027 Total Qty Cost 7,018 14,349 14,349 14,129 14,129 8,074 15,424 15,424 22,786 22,786 31,035,504 32,605,147 33,053,447 39,199,963 39,199,963 448,300 UNCLASSIFIED Volume 1 - xv === page 18 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - xvi === page 19 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Master Line Item Table of Contents (by Appropriation then Line Number) Appropriation 3080F: Other Procurement, Air Force Line # BA BSA Line Item Number Line Item Title Page 1 02 01 821800 Passenger Carrying Vehicles.................................................................................................................Volume 1 - 1 2 02 02 822230 Medium Tactical Vehicle........................................................................................................................ Volume 1 - 3 3 02 02 822910 Cap Vehicles.......................................................................................................................................... Volume 1 - 5 4 02 02 822990 Cargo and Utility Vehicles..................................................................................................................... Volume 1 - 7 5 02 03 823210 Joint Light Tactical Vehicle.................................................................................................................... Volume 1 - 9 6 02 03 823230 Security And Tactical Vehicles............................................................................................................ Volume 1 - 19 7 02 03 823990 Special Purpose Vehicles.................................................................................................................... Volume 1 - 21 8 02 04 824010 Fire Fighting/Crash Rescue Vehicles.................................................................................................. Volume 1 - 23 9 02 05 825990 Materials Handling Vehicles.................................................................................................................Volume 1 - 25 10 02 06 826210 Runway Snow Remov And Cleaning Equ........................................................................................... Volume 1 - 27 11 02 06 826990 Base Maintenance Support Vehicles................................................................................................... Volume 1 - 29 12 02 07 827000 Mission Support Vehicles.....................................................................................................................Volume 1 - 31 UNCLASSIFIED Volume 1 - xvii === page 20 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Appropriation 3080F: Other Procurement, Air Force Line # BA BSA Line Item Number Line Item Title Page 14 03 01 831010 Comsec Equipment..............................................................................................................................Volume 1 - 51 15 03 01 831020 STRATEGIC MICROELECTRONIC SUPPLY SYSTEM......................................................................Volume 1 - 65 16 03 02 832050 International Intel Tech & Architectures...............................................................................................Volume 1 - 69 17 03 02 832060 Intelligence Training Equipment...........................................................................................................Volume 1 - 77 18 03 02 832070 Intelligence Comm Equipment............................................................................................................. Volume 1 - 85 19 03 03 833010 Air Traffic Control & Landing Sys...................................................................................................... Volume 1 - 113 20 03 03 833020 National Airspace System..................................................................................................................Volume 1 - 153 21 03 03 833030 Battle Control System - Fixed............................................................................................................Volume 1 - 163 22 03 03 833040 Theater Air Control Sys Improvemen................................................................................................ Volume 1 - 171 23 03 03 833060 3D Expeditionary Long-Range Radar................................................................................................ Volume 1 - 175 24 03 03 833070 Weather Observation Forecast.......................................................................................................... Volume 1 - 185 25 03 03 833140 Strategic Command And Control....................................................................................................... Volume 1 - 197 26 03 03 833160 Cheyenne Mountain Complex............................................................................................................Volume 1 - 221 27 03 03 833170 Mission Planning Systems................................................................................................................. Volume 1 - 227 28 03 03 833570 Strategic Mission Planning & Execution System............................................................................... Volume 1 - 237 29 03 04 834010 General Information Technology........................................................................................................Volume 1 - 247 UNCLASSIFIED Volume 1 - xviii === page 21 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Appropriation 3080F: Other Procurement, Air Force Line # BA BSA Line Item Number Line Item Title Page 30 03 04 834040 Af Global Command & Control Sys................................................................................................... Volume 1 - 313 31 03 04 834050 Battlefield Airborne Communication Node (BACN)............................................................................Volume 1 - 317 32 03 04 834070 Mobility Command And Control......................................................................................................... Volume 1 - 321 33 03 04 834130 Air Force Physical Security System...................................................................................................Volume 1 - 325 34 03 04 834180 Samtec Communications................................................................................................................... Volume 1 - 359 35 03 04 834190 Combat Training Ranges................................................................................................................... Volume 1 - 371 36 03 04 834210 Minimum Essential Emergency Comm N.......................................................................................... Volume 1 - 385 37 03 04 834240 Wide Area Surveillance (WAS)..........................................................................................................Volume 1 - 415 38 03 04 834320 C3 Countermeasures......................................................................................................................... Volume 1 - 423 39 03 04 834470 Defense Enterprise Accounting & Mgt Sys........................................................................................Volume 1 - 449 40 03 04 834520 Theater Battle Mgt C2 System.......................................................................................................... Volume 1 - 459 41 03 04 834530 Air & Space Operations Center (AOC)..............................................................................................Volume 1 - 465 42 03 05 835060 Base Information Transpt Infrast (BITI) Wired................................................................................... Volume 1 - 481 43 03 05 835080 AFNET................................................................................................................................................Volume 1 - 489 44 03 05 835110 Joint Communications Support Element (JCSE)............................................................................... Volume 1 - 497 45 03 05 835140 USCENTCOM.................................................................................................................................... Volume 1 - 501 46 03 05 835160 USSTRATCOM.................................................................................................................................. Volume 1 - 507 47 03 05 835210 USSPACECOM.................................................................................................................................. Volume 1 - 515 UNCLASSIFIED Volume 1 - xix === page 22 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Appropriation 3080F: Other Procurement, Air Force Line # BA BSA Line Item Number Line Item Title Page 48 03 07 837100 Tactical C-E Equipment..................................................................................................................... Volume 1 - 523 49 03 07 837140 Next Generation Survival Radio (NGSR)...........................................................................................Volume 1 - 551 50 03 07 837170 Combat Survivor Evader Locater.......................................................................................................Volume 1 - 559 51 03 07 837190 Radio Equipment................................................................................................................................Volume 1 - 563 52 03 07 837300 Base Comm Infrastructure................................................................................................................. Volume 1 - 579 53 03 08 838010 Comm Elect Mods............................................................................................................................. Volume 1 - 605 Appropriation 3080F: Other Procurement, Air Force Line # BA BSA Line Item Number Line Item Title Page 54 04 02 842990 Personal Safety and Rescue Equipment........................................................................................... Volume 1 - 645 55 04 03 843040 POWER CONDITIONING EQUIPMENT............................................................................................Volume 1 - 663 56 04 03 843050 Mechanized Material Handling Equip................................................................................................ Volume 1 - 673 57 04 05 845010 Base Procured Equipment................................................................................................................. Volume 1 - 685 58 04 05 845100 Engineering and EOD Equipment......................................................................................................Volume 1 - 697 59 04 05 845420 Mobility Equipment.............................................................................................................................Volume 1 - 709 60 04 05 845550 Fuels Support Equipment (FSE)........................................................................................................Volume 1 - 731 UNCLASSIFIED Volume 1 - xx === page 23 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Appropriation 3080F: Other Procurement, Air Force Line # BA BSA Line Item Number Line Item Title Page 61 04 05 845990 Base Maintenance and Support Equipment...................................................................................... Volume 1 - 745 63 04 06 846070 DARP RC135..................................................................................................................................... Volume 1 - 751 64 04 06 846080 DCGS-AF........................................................................................................................................... Volume 1 - 757 66 04 06 846510 Special Update Program....................................................................................................................Volume 1 - 773 Appropriation 3080F: Other Procurement, Air Force Line # BA BSA Line Item Number Line Item Title Page 67 05 01 861350 Spares and Repair Parts (Cyber)...................................................................................................... Volume 1 - 775 68 05 01 861900 Spares And Repair Parts...................................................................................................................Volume 1 - 779 UNCLASSIFIED Volume 1 - xxi === page 24 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - xxii === page 25 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Master Line Item Table of Contents (Alphabetically by Line Item Title) Line Item Title Line Item Number Line # BA BSA Page 3D Expeditionary Long-Range Radar 833060 23 03 03................... Volume 1 - 175 AFNET 835080 43 03 05................... Volume 1 - 489 Af Global Command & Control Sys 834040 30 03 04................... Volume 1 - 313 Air & Space Operations Center (AOC) 834530 41 03 04................... Volume 1 - 465 Air Force Physical Security System 834130 33 03 04................... Volume 1 - 325 Air Traffic Control & Landing Sys 833010 19 03 03................... Volume 1 - 113 Base Comm Infrastructure 837300 52 03 07................... Volume 1 - 579 Base Information Transpt Infrast (BITI) Wired 835060 42 03 05................... Volume 1 - 481 Base Maintenance Support Vehicles 826990 11 02 06..................... Volume 1 - 29 Base Maintenance and Support Equipment 845990 61 04 05................... Volume 1 - 745 Base Procured Equipment 845010 57 04 05................... Volume 1 - 685 Battle Control System - Fixed 833030 21 03 03................... Volume 1 - 163 Battlefield Airborne Communication Node (BACN) 834050 31 03 04................... Volume 1 - 317 C3 Countermeasures 834320 38 03 04................... Volume 1 - 423 Cap Vehicles 822910 3 02 02....................... Volume 1 - 5 Cargo and Utility Vehicles 822990 4 02 02....................... Volume 1 - 7 Cheyenne Mountain Complex 833160 26 03 03................... Volume 1 - 221 UNCLASSIFIED Volume 1 - xxiii === page 26 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Combat Survivor Evader Locater 837170 50 03 07................... Volume 1 - 559 Combat Training Ranges 834190 35 03 04................... Volume 1 - 371 Comm Elect Mods 838010 53 03 08................... Volume 1 - 605 Comsec Equipment 831010 14 03 01..................... Volume 1 - 51 DARP RC135 846070 63 04 06................... Volume 1 - 751 DCGS-AF 846080 64 04 06................... Volume 1 - 757 Defense Enterprise Accounting & Mgt Sys 834470 39 03 04................... Volume 1 - 449 Engineering and EOD Equipment 845100 58 04 05................... Volume 1 - 697 Fire Fighting/Crash Rescue Vehicles 824010 8 02 04..................... Volume 1 - 23 Fuels Support Equipment (FSE) 845550 60 04 05................... Volume 1 - 731 General Information Technology 834010 29 03 04................... Volume 1 - 247 Intelligence Comm Equipment 832070 18 03 02..................... Volume 1 - 85 Intelligence Training Equipment 832060 17 03 02..................... Volume 1 - 77 International Intel Tech & Architectures 832050 16 03 02..................... Volume 1 - 69 Joint Communications Support Element (JCSE) 835110 44 03 05................... Volume 1 - 497 Joint Light Tactical Vehicle 823210 5 02 03....................... Volume 1 - 9 Materials Handling Vehicles 825990 9 02 05..................... Volume 1 - 25 Mechanized Material Handling Equip 843050 56 04 03................... Volume 1 - 673 Medium Tactical Vehicle 822230 2 02 02....................... Volume 1 - 3 Minimum Essential Emergency Comm N 834210 36 03 04................... Volume 1 - 385 UNCLASSIFIED Volume 1 - xxiv === page 27 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Mission Planning Systems 833170 27 03 03................... Volume 1 - 227 Mission Support Vehicles 827000 12 02 07..................... Volume 1 - 31 Mobility Command And Control 834070 32 03 04................... Volume 1 - 321 Mobility Equipment 845420 59 04 05................... Volume 1 - 709 National Airspace System 833020 20 03 03................... Volume 1 - 153 Next Generation Survival Radio (NGSR) 837140 49 03 07................... Volume 1 - 551 POWER CONDITIONING EQUIPMENT 843040 55 04 03................... Volume 1 - 663 Passenger Carrying Vehicles 821800 1 02 01....................... Volume 1 - 1 Personal Safety and Rescue Equipment 842990 54 04 02................... Volume 1 - 645 Radio Equipment 837190 51 03 07................... Volume 1 - 563 Runway Snow Remov And Cleaning Equ 826210 10 02 06..................... Volume 1 - 27 STRATEGIC MICROELECTRONIC SUPPLY SYSTEM 831020 15 03 01..................... Volume 1 - 65 Samtec Communications 834180 34 03 04................... Volume 1 - 359 Security And Tactical Vehicles 823230 6 02 03..................... Volume 1 - 19 Spares And Repair Parts 861900 68 05 01................... Volume 1 - 779 Spares and Repair Parts (Cyber) 861350 67 05 01................... Volume 1 - 775 Special Purpose Vehicles 823990 7 02 03..................... Volume 1 - 21 Special Update Program 846510 66 04 06................... Volume 1 - 773 Strategic Command And Control 833140 25 03 03................... Volume 1 - 197 Strategic Mission Planning & Execution System 833570 28 03 03................... Volume 1 - 237 UNCLASSIFIED Volume 1 - xxv === page 28 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Tactical C-E Equipment 837100 48 03 07................... Volume 1 - 523 Theater Air Control Sys Improvemen 833040 22 03 03................... Volume 1 - 171 Theater Battle Mgt C2 System 834520 40 03 04................... Volume 1 - 459 USCENTCOM 835140 45 03 05................... Volume 1 - 501 USSPACECOM 835210 47 03 05................... Volume 1 - 515 USSTRATCOM 835160 46 03 05................... Volume 1 - 507 Weather Observation Forecast 833070 24 03 03................... Volume 1 - 185 Wide Area Surveillance (WAS) 834240 37 03 04................... Volume 1 - 415 UNCLASSIFIED Volume 1 - xxvi === page 29 === Executive Summary for Other Procurement, Air Force Table 1: Funding Overview FY 2025 ($K) FY 2026 ($K) FY 2027 ($K) Discretionary $31,034,304 $32,605,147 $39,199,963 Mandatory $1,200 $448,300 $0 Total $31,035,504 $33,053,447 $39,199,963 Table 2: Detailed Mandatory Breakout BLI Reconciliation Bin Title 822990 INDOPACOM Capabilities $600 823990 INDOPACOM Capabilities $7,000 825990 INDOPACOM Capabilities $7,400 826210 INDOPACOM Capabilities $1,000 826990 INDOPACOM Capabilities $14,000 834130 Low-Cost Weapons $96,900 835140 Low-Cost Weapons 837100 Low-Cost Weapons $32,000 837300 Nuclear $1,400 845420 INDOPACOM Capabilities $41,000 845550 INDOPACOM Capabilities $29,000 846510 Air Superiority $218,000 Mandatory Total FY 2025 ($K) FY 2026 ($K) FY 2027 ($K) $1,200 $1,200 $448,300 $0 Volume 1 - xxvii === page 30 === MANDATORY FUNDING JUSTIFICATION: The FY 2027 request for Air Force Other Procurement includes $39,199,963 thousand of discretionary and no mandatory for a total of $39,199,963. The FY 2026 spend plan amount for Air Force Other Procurement includes $32,605,147 thousand of discretionary and $448,330 thousand of mandatory (reconciliation) for a total of $33,053,447. The FY 2025 spend plan amount for Air Force Other Procurement includes $31,034,304 thousand of discretionary and $1,200 thousand of mandatory (reconciliation) for a total of $31,035,504. Volume 1 - xxviii === page 31 === UNCLASSIFIED ACRONYMS GENERAL ACRONYMS A&AS ABIDES ACAT ACTD AGM AIM AIS ACMI AMRAAM APPN ATD BA BES BY C3 CFE CONOPS CONUS CPMS CPT CRA CTS CY ECCM ECM ECO EOQ ECP EPA EW EWAISP FLIR - Advisory & Assistance Services - Automated Budget Interactive Data Environment System - Acquisition Category - Advanced Concept Technology Demonstration - Air-to-Ground Missile - Air Intercept Missile - Avionics Intermediate Shop - Aircraft Combat Maneuvering Instrumentation - Advanced Medium-Range Air-to-Air Missile - Appropriation - Advanced Technology Development - Budget Activity - Budget Estimate Submission - Budget Year - Command, Control, and Communication System - Contractor Furnished Equipment - Concept of Operation - Continental United States - Comprehensive Power Management System - Cockpit Procedures Trainer - Continuing Resolution Authority - Countermeasures Test Set - Current Year - Electronic Counter Counter-Measures - Electronic Counter Measures - Engineering Change Orders - Economic Order Quantity - Engineering Change Proposal - Economic Price Adjustment - Electronic Warfare - Electronic Warfare Avionics Integration Support Facility - Forward Looking Infra Red UNCLASSIFIED Volume 1 - xxix === page 32 === UNCLASSIFIED FOT&E FOC FLTS FPIF FPIS FY GANS GATM GFE GFP GPS GSE ICS IOC IT JUON MAIS MDAP METS MYP NAVWAR NMC Rate OCO OOC OT&E OWRM PAGEL PB PBR PMA PMC PNO PR PRCP PTT PY - Follow-on Test and Evaluation - Fully Operational Capability - Flight Line Test Set - Fixed Price Incentive Firm - Fixed Price Incentive Fee, Successive Targets - Fiscal Year - Global Access Navigation & Safety - Global Air Traffic Management - Government Furnished Equipment - Government Furnished Property - Global Positioning System - Ground Support Equipment - Interim Contractor Support - Initial Operating Capability - Information Technology - Joint Urgent Operational Need - Major Automated Information System Program - Major Defense Acquisition Program - Mobile Electronic Test Stations - Multiyear Procurement - Navigation Warfare - Not Mission Capable Rate - Overseas Contingency Operations - Overseas Operations Costs - Operational Test and Evaluation - Other War Reserve Material - Priced Aerospace Ground Equipment List - President's Budget - Program Budget Review - Program Management Administration - Procurement Method Code - Acquisition Program Number (MDAP Codes) - Purchase Request - Program Resource Collection Process - Part Task Trainer - Prior Year UNCLASSIFIED Volume 1 - xxx === page 33 === UNCLASSIFIED R&M RAA RDT&E RWR ROM SS SOF TAF TCAS TEWS TISS TOA WCF WRM WST UAV XML - Reliability and Maintainability - Rapid Acquisition Authority - Research, Development, Test and Evaluation - Radar Warning Receiver - Rough Order of Magnitude - Sole Source - Special Operation Force - Tactical Air Force - Traffic Collision Alert and Avoidance System - Tactical Electronic Warfare System - TEWS Intermediate Support System - Total Obligation Authority - Working Capital Fund - War Reserve Material - Weapon System Trainer - Unmanned Aerial Vehicle - Extensible Markup Language BASE / ORGANIZATIONAL ACRONYMS ACC - Air Combat Command AETC - Air Education & Training Command AFCAO - Air Force Computer Acquisition Office AFCESA - Air Force Civil Engineering Support Agency AFCIC - AF Communications & Information Center AFCSC - Air Force Cryptologic Service Center AFESC - Air Force Engineering Services Center AFGWC - Air Force Global Weather Central AFIT - Air Force Institute of Technology AFLCMC - Air Force Life Cycle Management Center AFMC - Air Force Materiel Command AFMETCAL - Air Force Metrology and Calibration Office AFMLO - Air Force Medical Logistics Office AFOSI - Air Force Office of Special Investigation AFOTEC - Air Force Operational Test & Evaluation Center AFPC - Air Force Personnel Center UNCLASSIFIED Volume 1 - xxxi === page 34 === UNCLASSIFIED AFPSL AFR AFSOC AFSPC AIA ALC AMC ANG ASC AETC AU AWS CIA DGSC DLA DOE DPSC DSCC DTIC ER ESC FAA FBI GSA JCS NATO OSW PACAF USAF USAFA USAFE USCENTCOM USEUCOM USMC USSTRATCOM WP AFB - AF Primary Standards Lab - Air Force Reserve - AF Special Operations Command - Air Force Space Command - Air Intelligence Agency - Air Logistics Center - Air Mobility Command - Air National Guard - Aeronautical Systems Center - Air Education Training Command - Air University - Air Weather Service - Central Intelligence Agency - Defense General Support Center - Defense Logistics Center - Department of Energy - Defense Personnel Support Center - Defense Supply Center, Columbus - Defense Technical Information Center - Eastern Range - Electronic Systems Center - Federal Aviation Agency - Federal Bureau of Investigation - General Services Administration - Joint Chiefs of Staff - North Atlantic Treaty Organization - Office of the Secretary of War - Pacific Air Forces - United States Air Force - United States Air Force Academy - United States Air Force Europe - United States Central Command - United States European Command - United States Marine Corps - United States Strategic Command - Wright-Patterson AFB, OH UNCLASSIFIED Volume 1 - xxxii === page 35 === UNCLASSIFIED CONTRACT METHOD / TYPE ACRONYMS C - Competitive BA - Basic Agreement BOA - Basic Ordering Agreement BPA - Blanket Purchasing Agreement CS - Cost Sharing IDDQ - Indefinite Delivery, Definite Quantity IDIQ - Indefinite Delivery, Indefinite Quantity IDRT - Indefinite Delivery, Requirements Letter - Letter LH - Labor-hour MIPR - Military Interdepartmental Purchase Request MIPR-C - Military Interdepartmental Purchase Request - Competitive MIPR-OPT - Military Interdepartmental Purchase Request - Option MIPR-OTH - Military Interdepartmental Purchase Request – Other MIPR-SS - Military Interdepartmental Purchase Request - Sole Source OPT - Option OTH - Other PO - Project Order REQN - Requisition SS - Sole Source T&M - Time and Materials UCA - Undefinitized Contract Action WP - Work Project CONTRACTED BY ACRONYMS 11 WING - 11th Support Wing, Washington, DC ACC - Air Combat Command, Langley AFB, VA AEDC - Arnold Engineering Development Center, Arnold AFB, TN AAC - Air Armament Center, Eglin AFB, FL AEDC - Arnold Engineering Development Center, Arnold AFB, TN AETC - Air Education and Training Command, Randolph AFB, TX AFCIC - Air Force Communications and Information Center, Washington, DC AFCESA - Air Force Civil Engineering Support Agency, Tyndall AFB, FL UNCLASSIFIED Volume 1 - xxxiii === page 36 === UNCLASSIFIED AFFTC AFLCMC AFMC AFMETCAL AFMLO AIA AMC ASC AFWA DGSC DPSC ER ESC HSC OC-ALC OO-ALC SMC US STRATCOM WACC WR WR-ALC AFSPC HQ ANG USAFE USAFA - Air Force Flight Test Center, Edwards AFB, CA - Air Force Life Cycle Management Center, Wright-Patterson AFB, OH - Air Force Materiel Command, Wright-Patterson AFB, OH - Air Force Metrology and Calibration Office, Heath, Ohio - Air Force Medical Logistics Office, Ft Detrick, MD - Air Intelligence Agency, Kelly AFB, TX - Air Mobility Command, Scott AFB, IL - Aeronautical Systems Center, Wright-Patterson AFB, OH & Eglin AFB, FL - Air Force Weather Agency, Offutt AFB, NE - Defense General Support Center, Richmond, VA - Defense Personnel Support Center, Philadelphia, PA - Eastern Range, Patrick SFB, FL - Electronic Systems Center, Hanscom AFB, MA - Human Services Center, Brook AFB, TX - Oklahoma City Air Logistics Center, Tinker AFB, OK - Ogden Air Logistics Center, Hill AFB, UT - Space & Missile Systems Center, Los Angeles AFB, CA - US Strategic Command, Offutt AFB, NE - Washington Area Contracting Center, Washington DC - Western Range, Vandenberg SFB, CA - Warner-Robins Air Logistics Center, Robins AFB, GA - Air Force Space Command, Peterson AFB, CO - Headquarters, Air National Guard, Washington, DC - United States Air Force Europe, Ramstein AB, GE - United States Air Force Academy, Colorado Springs, CO IDENTIFICATION CODES Code “A” - Line items of material which have been approved for Air Force service use. Code “B” - Line items of material that have not been approved for Service use OBAN - Operating Budget Account Number, 2-digit code for unit allocated funds UNCLASSIFIED Volume 1 - xxxiv === page 37 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 821800 / Passenger Carrying Vehicles Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 1: Passenger Carrying Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 6.677 5.557 0.000 - 0.000 0.000 0.000 0.000 0.000 - 12.234 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 6.677 5.557 0.000 - 0.000 0.000 0.000 0.000 0.000 - 12.234 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 6.677 5.557 0.000 - 0.000 0.000 0.000 0.000 0.000 - 12.234 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: This Budget Line Item (BLI) was consolidated for the FY27 President's Budget (PB). The new BLI, 827000, improves transparency, execution, and long‑term planning. Passenger Carrying Vehicles includes the procurement of sedans, law enforcement sedans, ambulances, armored sedans, small buses, transit buses, large buses, intra-city motorcoach, and work buses. These vehicles are general in nature, but they fulfill unique and distinct needs commensurate with their design. Sedans are available in compact, mid-size, and large, and are used to support a variety of functions and missions at all levels of the Air Force. A portion of these sedans is dedicated for use by the Office of Special Investigations (OSI). Law Enforcement Sedans (LE Sedans) come equipped with a heavy-duty component package for law enforcement and security missions. Security forces personnel use this type of vehicle for emergency response, traffic control, patrol duties, and base security operations. Ambulances include both bus ambulances and modular ambulances used for medical evacuation operations. The bus ambulance is a 44-passenger bus converted to accommodate massive patient transport for medical emergency situations and humanitarian/disaster relief operations. The modular models are standard commercial ambulances available in 4x2 and 4x4 configurations. They are used for the movement of patients under field conditions, aircraft crash rescue operations, and routine transportation of patients to and from medical facilities. Buses include a variety of commercial vehicles that support a broad range of mass transit requirements. Bus sizes range from the 16-passenger shuttle bus to the 52-passenger bus. These vehicles support Air Education and Training Command (AETC) training units, Air Force band organizations, protocol offices, and several other missions. FIAR Compliance Statement: - "This requirement (or modification) supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. In direct support of SECWAR direction to increase readiness across the DoW, efforts within this PEC will be prioritized based on the National Defense Authorization Act (NDAA), USAF Force Design, Agile Combat Employment (ACE), and the Defense Planning Guide (DPG). These efforts will support work and collaboration efforts across the Combat Readiness Directorate in PEs 78051F, 71212F, 72833F, 64706F, 65827F, 22834F, 52834F, 28031F, 41135F and 27521F -- to increase readiness across the Air Force Enterprise. LI 821800 - Passenger Carrying Vehicles Air Force UNCLASSIFIED Page 1 of 2 P-1 Line #1 Volume 1 - 1 === page 38 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 821800 / Passenger Carrying Vehicles Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 1: Passenger Carrying Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Secondary Distribution AF Quantity Total Obligation Authority AFNG Quantity Total Obligation Authority AFR Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 51 37 0 0 0 - - - - 6.485 5.327 0.000 0.000 0.000 - - - - 1 1 0 0 0 - - - - 0.192 0.230 0.000 0.000 0.000 - - - - 0 0 0 0 0 - - - - 0.000 0.000 0.000 0.000 0.000 - - - - 52 38 0 0 0 - - - - 6.677 5.557 0.000 0.000 0.000 - - - - Justification: BASIS FOR FY 2027 BUDGET REQUEST: This Budget Line Item (BLI) was consolidated for the FY27 President's Budget (PB). The new BLI, 827000, improves transparency, execution, and long‑term planning. LI 821800 - Passenger Carrying Vehicles Air Force UNCLASSIFIED Page 2 of 2 P-1 Line #1 Volume 1 - 2 === page 39 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 2: Cargo and Utility Vehicles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 822230 / Medium Tactical Vehicle Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 5.248 3.938 0.000 - 0.000 0.000 0.000 0.000 0.000 - 9.186 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 5.248 3.938 0.000 - 0.000 0.000 0.000 0.000 0.000 - 9.186 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 5.248 3.938 0.000 - 0.000 0.000 0.000 0.000 0.000 - 9.186 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: This Budget Line Item (BLI) was consolidated for the FY27 President's Budget (PB). The new BLI, 827000, improves transparency, execution, and long‑term planning. The Medium Tactical Vehicle portfolio contains a broad class of medium and heavy military specification vehicles with the capability to operate in austere and adverse terrain. They include, but are not limited to Cargo Trucks, Wreckers, Dump Trucks, Tractors, Mobilizers, and Medium and Heavy Tactical Trailers. They provide a range of capabilities such as line haul, mobility, resupply, maintenance, recovery, construction and civil engineering support. They can be ordered with armor and winch systems. These tactical vehicles are used by Combat Communication Units, Air Support Operation Squadrons (ASOS), Explosive Ordinance Disposal units (EOD), and other direct mission support units throughout the Air Force. FIAR Compliance Statement: - "This requirement (or modification) supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Secondary Distribution AF Quantity Total Obligation Authority AFNG Quantity Total Obligation Authority AFR Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 822230 - Medium Tactical Vehicle Air Force FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 19 15 0 0 0 - - - - 3.063 2.032 0.000 0.000 0.000 - - - - 12 9 0 0 0 - - - - 1.941 1.906 0.000 0.000 0.000 - - - - 4 0 0 0 0 - - - - 0.244 0.000 0.000 0.000 0.000 - - - - 35 24 0 0 0 - - - - 5.248 3.938 0.000 0.000 0.000 - - - - UNCLASSIFIED Page 1 of 2 P-1 Line #2 Volume 1 - 3 === page 40 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 2: Cargo and Utility Vehicles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 822230 / Medium Tactical Vehicle Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Justification: BASIS FOR FY 2027 BUDGET REQUEST: This Budget Line Item (BLI) was consolidated for the FY27 President's Budget (PB). The new BLI, 827000, improves transparency, execution, and long‑term planning. LI 822230 - Medium Tactical Vehicle Air Force UNCLASSIFIED Page 2 of 2 P-1 Line #2 Volume 1 - 4 === page 41 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 2: Cargo and Utility Vehicles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 822910 / Cap Vehicles Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 2.000 3.300 0.000 - 0.000 0.000 0.000 0.000 0.000 - 5.300 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 2.000 3.300 0.000 - 0.000 0.000 0.000 0.000 0.000 - 5.300 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 2.000 3.300 0.000 - 0.000 0.000 0.000 0.000 0.000 - 5.300 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: This Budget Line Item (BLI) was consolidated for the FY27 President's Budget (PB). The new BLI, 827000, improves transparency, execution, and long‑term planning. The Civil Air Patrol (CAP) is a Congressionally chartered non-profit corporation that serves as the Auxiliary of the Air Force. CAP uses federally provided resources to provide assistance requested by the Department of War (DoW), federal, state or local government authorities and non-governmental organizations (NGOs) to perform emergency or non-emergency public purpose missions and activities. Pursuant to US Code (Title 10 & 36) the purpose of CAP Corporation is to encourage and aid citizens of the US in contributing their efforts, services, and resources in developing aviation and in maintaining air supremacy; and to encourage and develop, by example, the voluntary contribution of private citizens to the public welfare. Vehicle procurements enable the Civil Air Patrol (CAP) to provide rapid deployment of emergency essential ground teams who are capable of providing critical communications and humanitarian support during national emergencies and disasters. CAP's procurement processes/standards are described in Department of Defense Grant & Agreement Regulations. Program element associated with this P-1 Line is: 0901223F Justification: This Budget Line Item (BLI) was consolidated for the FY27 President's Budget (PB). The new BLI, 827000, improves transparency, execution, and long‑term planning. LI 822910 - Cap Vehicles Air Force UNCLASSIFIED Page 1 of 1 P-1 Line #3 Volume 1 - 5 === page 42 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 6 === page 43 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 2: Cargo and Utility Vehicles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 822990 / Cargo and Utility Vehicles Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Procurement Quantity (Units in Each) - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 70.873 57.155 0.000 - 0.000 0.000 0.000 0.000 0.000 - Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 70.873 57.155 0.000 - 0.000 0.000 0.000 0.000 0.000 - Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 70.873 57.155 0.000 - 0.000 0.000 0.000 0.000 0.000 - Total 128.028 128.028 128.028 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: This Budget Line Item (BLI) was consolidated for the FY27 President's Budget (PB). The new BLI, 827000, improves transparency, execution, and long‑term planning. This vehicle group consists of pickup trucks, trailers, semi-trailers, trucks, vans, utility trucks, maintenance, armored utility vehicles, cargo truck, truck tractors, armored sport utility vehicles, sport utility vehicles, and facility vehicles essential to base and flying operations. Assets are vital to the Air Force mission and are essential to flight line operations (aircraft maintenance), depot maintenance, component routing to depot back shops and airfield maintenance, and Air Base Civil Engineers performing base housing maintenance and repairs. These items are critical across the spectrum of functional users throughout the Air Force and provide multi-purpose capabilities. These vehicles also support mission needs for light to heavy cargo transport, as well as transportation for air/flight crew personnel. Cargo utility vehicles also provide heavy cargo movement for civil engineering and construction projects. Without the procurement of these replacement vehicles, the Air Force will not have the ability to support broad spectrum Air Force operations. The FY 2026 spend plan amount for 3080 includes 57,155 thousand of discretionary and 600 thousand of mandatory (reconciliation) for a total of 57,755 thousand. FIAR Compliance Statement: - "This requirement (or modification) supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Secondary Distribution AF Quantity Total Obligation Authority AFNG Quantity Total Obligation Authority AFR Quantity Total Obligation Authority Total: Quantity LI 822990 - Cargo and Utility Vehicles Air Force FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 495 378 0 0 0 - - - - 57.827 47.666 0.000 0.000 0.000 - - - - 126 103 0 0 0 - - - - 8.496 6.603 0.000 0.000 0.000 - - - - 79 50 0 0 0 - - - - 4.550 2.886 0.000 0.000 0.000 - - - - 700 531 0 0 0 - - - - UNCLASSIFIED Page 1 of 2 P-1 Line #4 Volume 1 - 7 === page 44 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 2: Cargo and Utility Vehicles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 822990 / Cargo and Utility Vehicles Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Secondary Distribution Secondary Distribution Total Obligation Authority FY 2025 70.873 FY 2026 57.155 FY 2027 Base FY 2027 OOC 0.000 0.000 FY 2027 Total FY 2028 0.000 FY 2029 - FY 2030 - FY 2031 - - Justification: - BASIS FOR FY 2027 BUDGET REQUEST: This Budget Line Item (BLI) was consolidated for the FY27 President's Budget (PB). The new BLI, 827000, improves transparency, execution, and long‑term planning. LI 822990 - Cargo and Utility Vehicles Air Force UNCLASSIFIED Page 2 of 2 P-1 Line #4 Volume 1 - 8 === page 45 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 3: Special 823210 / Joint Light Tactical Vehicle Purpose Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 71.150 64.340 57.226 58.321 - Procurement Quantity (Units in Each) - - - Gross/Weapon System Cost ($ in Millions) - 59.483 62.202 Less PY Advance Procurement ($ in Millions) - - - Net Procurement (P-1) ($ in Millions) - 59.483 62.202 Plus CY Advance Procurement ($ in Millions) - - - Total Obligation Authority ($ in Millions) - 59.483 62.202 103.304 103.304 103.304 - 103.304 103.304 103.304 To FY 2031 Complete - - - - - 71.150 64.340 57.226 58.321 - - - - - - 71.150 64.340 57.226 58.321 - Total 476.026 476.026 476.026 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The Joint Light Tactical Vehicle (JLTV) Family of Vehicles (FoV) has been chosen by the Department of War (DoW) as the multi-service (Marine Corps, Army, Navy, and Air Force) tactical vehicle replacement for the Up-Armored High Mobility Multipurpose-Wheeled Vehicle (UAHMMWV). The Army has been assigned lead service responsibilities for the JLTV and established a Joint Program Office (JPO). All JLTVs must be acquired through the Army-led JPO contract. The JLTV provides major operational improvements in Force Protection (FP), payload, mobility, fuel efficiency and reliability, along with the growth potential to meet future mission requirements. The JLTV also has a companion trailer that is available with the vehicle to replace the HMMWV trailer (M1101/M1102). Air Force (USAF) investment in JLTVs began in FY2017 and FY2018 under Weapons System Code (WSC) 823230 Security and Tactical Vehicles. Starting in FY2019, JLTV procurement changed to WSC 823210. Currently, the USAF intends to purchase 2,351 JLTVs and 1,105 trailers. Planned USAF JLTV quantities were adjusted following completion of an equipment posture review by the Tactical Air Control Party user community which spanned the second half of 2025 and into early 2026. USAF JLTVs span 3 different vehicle variants consisting of 9 different mission configurations and a JLTV trailer. The 4 primary functional users for the Air Force are Security Forces, Explosive Ordnance Disposal, Tactical Air Control Party, and Special Operations. Additional modernized configurations are continuously being developed through Work Directives generated and coordinated through the JPO. General Purpose (GP) JLTV - The GP JLTV is the base vehicle that carries a 4 person-crew with a payload of 3,500 lbs. Current/projected users: Air Combat Command (ACC), Air Force Materiel Command (AFMC), Air Mobility Command (AMC), Pacific Air Forces (PACAF), US Air Forces Europe (USAFE). Utility (UTL) JLTV - The Utility JLTV carries a 2 person-crew for cargo delivery or shelter carrier. It supports a payload of 5,100 lbs. Current/projected users: ACC, AFMC, AMC, PACAF. Heavy Guns Carrier (HGC) JLTV - The HGC JLTV carries a 4 person-crew and a Gunner in Turret or Common Remotely Operated Weapon System (CROWS). It supports crew served weapons with an Overhead Gunner's Protection Kit (OGPK) or Common Remotely Operated Weapon Station (CROWS). Current/projected users: Air Education & Training Command (AETC), Air Forces Central (AFCENT), Air Force Global Strike Command (AFGSC), AMC, PACAF, USAFE, United States Space Force (USSF). JLTV Trailer - The JLTV Trailer is capable of meeting similar mobility characteristics to the prime mover and is capable of safely carrying payload of 5500 lbs. Current/projected users: AETC, AFCENT, AFGSC, AMC, PACAF, USAFE, USSF. LI 823210 - Joint Light Tactical Vehicle Air Force UNCLASSIFIED Page 1 of 9 P-1 Line #5 Volume 1 - 9 === page 46 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 3: Special 823210 / Joint Light Tactical Vehicle Purpose Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Contractor Furnished Equipment (CFE) Kits: These are options that come fully installed and integrated into the vehicle during production. CFE kits include, but are not limited to, armor kits, intercom kits, run flat tires, combat bumpers, and expansion kits. Expansion Kits: These kits are installed during vehicle production and provide all necessary cabling (power, signal, Radio Frequency), connectors, and hardware to enable installation of Mission Specific Equipment above and beyond the Contractor furnished Base Vehicle Platform Infrastructure. These expansion kits include, but are not limited to, Original Equipment Manager (OEM) installed bracketry, cabling and wiring to host Mission Specific Equipment designated by user community requirements i.e. Bumper, winch, Smart Display Systems, Fording, Flat Tow, Run Flats, Shelters, Driver's Vision Enhance, Vehicular Radio Communications (VRC) radio kits, Improvised Explosive Device (IED) jamming kits, Driver Vision Enhancement (DVE) kits, and gunshot detection kits. Government Furnished Equipment (GFE): This consists of overhead equipment for the JLTV. Currently, the only Overhead GFE approved for procurement funds includes the M1114 Turret Ring and Hatch, OGPK, Improved Turret Drive System (ITDS), and the CROWS systems. The M1114 will apply to all HGC JLTV configurations, while OGPK, ITDS or CROWS applies to their respective HGC configurations. Integration and Field Service Representative (FSR) Support: Original Equipment Manufacturer (OEM) and/or contractor FSR support is required to provide de-processing (acceptance inspections) when the vehicles are delivered. During integration and delivery to final destinations, FSR's will install and function check Mission Support Equipment and additional overhead GFE as required. Work Directives: Studies and engineering tasks performed by the Army Joint Program Office or OEM engineers to ensure compatibility and operability on any new AF specific requirements that will be added to the JLTV based on user requirements. FIAR Compliance Statement: - This requirement (or modification) supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Increase/Decrease narrative: FY27 funding increased 41.102 million over FY26 including 5.930 million for JLTVs supporting air base defense, 1.894 million for JLTVs supporting missile field defense, and 2.561 million for the necessary mission support equipment (MSE) to deliver turn-key/mission-ready JLTVs to the customer. FY27 funding also contains 33.518 million for ANG Space Remissioning intended for Contingency Response. ANG is working to have the funds removed from the JLTV portfolio; they are included as a separate cost element. **Funding for this exhibit contained in PEs: 0101113F, 0207588F, 0208047F, 0502831F, 0504123F, 0507831F, 0702831F, and 0804731F. In direct support of SECWAR direction to increase readiness across the Department of War (DoW), efforts within this PEC will be prioritized based on the National Defense Authorization Act (NDAA), USAF Force Design, Agile Combat Employment (ACE), and the Defense Planning Guide (DPG). These efforts will support work and collaboration efforts across the Combat Readiness Directorate in PEs 0708051F, 0701212F, 0702833F, 0604706F, 0605827F, 0202834F, 0502834F, 0208031F, 0401135F and 0207521F -- to increase readiness across the Air Force Enterprise. LI 823210 - Joint Light Tactical Vehicle Air Force UNCLASSIFIED Page 2 of 9 P-1 Line #5 Volume 1 - 10 === page 47 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 3: Special 823210 / Joint Light Tactical Vehicle Purpose Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Joint Light Tactical Vehicle P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 59.483 - / 62.202 - / 103.304 - / - - / 103.304 - / - - / 59.483 - / 62.202 - / 103.304 - / - - / 103.304 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: - BASIS FOR FY 2027 BUDGET REQUEST: FY 2027 procurement dollars in the amount of 103.304 million will procure, but not be limited to 95 vehicles, 11 trailers in support of installation and unit mission requirements for Air Force personnel. Quantities are based on current requirements provided by the 441 Vehicle Support Chain Operations Squadron (VSCOS) IAW the process outlined in AFI 24-302, Vehicle Management. The procurement priorities are generated from functional community input, and the priority buy model that is used to support the Planning, Programming, Budgeting and Execution (PPBE) process. The model calculates vehicle requirements by fund year by WSC using end of life projections based on depreciation and service life of the vehicle, cumulative sustainment cost and mission priority. Quantity and type of vehicle/trailer procured is also based on the amount of funding authorized each fiscal year. Authorized funding below requested amount will cause reduced JLTV/trailer procurement, resulting in prolonged fielding of UAHMMWVs vehicles past the end of their service life, driving increased costs associated with keeping legacy UAHMMWVs serviceable until replacement is accomplished and inflated JLTV prices in future years. Quantities reflected show current requirements for each year supporting Active Duty, Air Force Reserve Center (AFRC), Air National Guard (ANG), Rapid Airfield Damage Repair (RADR), Regional Base Cluster Prepositioning Kits (RBCP), Gen Skills, Anti-Terrorism, Air Base Ground for Pacific Command (PACOM), US Air Forces in Europe (USAFE), US Central Command (CENTCOM) and other initiatives as they arise. Unit Cost is subject to change from year-to-year based on buy quantities of each Joint Light Tactical Vehicle (JLTV) variant and user Contractor Furnished Equipment (CFE) requirements based on their mission needs. Unit cost is also subject to change based on fluctuations in contract pricing. Unit cost is provided by the Joint Program Office at TACOM (Army). Common Remotely Operated Weapon Station (CROWS), Overhead Gunner Protection Kit (OGPK)s, and Field Service Representative (FSR)s are included in part of government furnished equipment (GFE). General Purpose (GP), Utility (UTL), and Heavy Guns Carrier (HGC) base unit costs written to match Army contract prices. LI 823210 - Joint Light Tactical Vehicle Air Force UNCLASSIFIED Page 3 of 9 P-1 Line #5 Volume 1 - 11 === page 48 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 823210 / Joint Light Tactical Vehicle Appropriation / Budget Activity / Budget Sub Activity: 3080F / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Joint Light Tactical Vehicle MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 Procurement Quantity (Units in Each) - - - Gross/Weapon System Cost ($ in Millions) - 59.483 62.202 Less PY Advance Procurement ($ in Millions) - - - Net Procurement (P-1) ($ in Millions) - 59.483 62.202 Plus CY Advance Procurement ($ in Millions) - - - Total Obligation Authority ($ in Millions) - 59.483 62.202 FY 2027 Base FY 2027 OOC - - 103.304 FY 2027 Total - - - 103.304 - 103.304 - - - 103.304 - 103.304 - - 103.304 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Vehicles - Joint Light Tactical Vehicle Cost Non Recurring Cost PMA: CONTRACTOR SERVICES (Work Directives, FSRs, ECPs, & Training) - - - - - 2.312 - - 2.815 - - 3.600 - - - - - 3.600 CONTRACTOR FURNISHED EQUIPMENT (CFE) - - - - - 14.969 - - 13.288 - - 15.099 - - - - - 15.099 JLTV TRAILER - - - 0.062 15 0.930 0.063 0.567 0.067 11 0.737 - - - 0.067 11 0.737 PMA OTHER GOVERNMENT COSTS(Travel, Admin, Studies, A&AS, & Tech Orders) - - - - - 0.900 - - 0.932 - - 1.810 - - - - - 1.810 NIWC Integration(AGBD) - - - - - 7.100 - - 8.000 - - 10.330 - - - - - 10.330 (†) - - - 0.329 57 18.753 0.338 68 22.984 0.338 70 23.660 - - - 0.338 70 23.660 GOVERNMENT FURNISHED EQUIPMENT (GFE) KITS - - - - - 5.000 - - 4.802 - - 6.100 - - - - - 6.100 JLTV, UTILITY (UT) - - - 0.318 2 0.636 - - - - - - - - - - - - - - - 0.329 27 8.883 0.339 26 8.814 0.338 25 8.450 - - - 0.338 25 8.450 JLTV, HEAVY GUNS CARRIER (HGC) JLTV, GENERAL (†) PURPOSE (GP) W LI 823210 - Joint Light Tactical Vehicle Air Force 9 UNCLASSIFIED Page 4 of 9 P-1 Line #5 Volume 1 - 12 === page 49 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 823210 / Joint Light Tactical Vehicle Appropriation / Budget Activity / Budget Sub Activity: 3080F / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Joint Light Tactical Vehicle MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements ANG Space Remission/ Contingency Response Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) - - - - - - - - - - - 33.518 - - - - - 33.518 Subtotal: Non Recurring Cost - - - - - 59.483 - - 62.202 - - 103.304 - - - - - 103.304 Subtotal: Vehicles - Joint Light Tactical Vehicle Cost - - - - - 59.483 - - 62.202 - - 103.304 - - - - - 103.304 Gross/Weapon System Cost - - - - - 59.483 - - 62.202 - - 103.304 - - - - - 103.304 Remarks: Industry standards such as inflation, cost of building materials (i.e. chassis, electronic components) and supply shortages are seen across the board for BPAC 823210 and all acquisition efforts. Note: FY27 PB Top Line contains $33.518 million for ANG Space Remissioning intended for Contingency Response. ANG is working to have the funds removed from the JLTV portfolio; they are included as a separate cost element. (†) indicates the presence of a P-5a LI 823210 - Joint Light Tactical Vehicle Air Force UNCLASSIFIED Page 5 of 9 P-1 Line #5 Volume 1 - 13 === page 50 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 02 / 3 Cost Elements JLTV, HEAVY GUNS CARRIER (†) (HGC) JLTV, HEAVY GUNS CARRIER (†) (HGC) JLTV, HEAVY GUNS CARRIER (HGC) JLTV, GENERAL PURPOSE (GP) (†) W JLTV, GENERAL PURPOSE (GP) (†) W JLTV, GENERAL PURPOSE (GP) W (†) O O C P-1 Line Item Number / Title: 823210 / Joint Light Tactical Vehicle Item Number / Title [DODIC]: Joint Light Tactical Vehicle FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) 2025 AMG / South Bend IN MIPR ARMY/ACC Feb 2025 Jan 2027 57 0.329 Y 2026 AMG / South Bend IN MIPR ARMY/ACC Feb 2026 Jan 2027 68 0.338 Y 2027 AMG / South Bend IN MIPR ARMY/ACC Feb 2026 Jan 2027 70 0.338 Y 2025 AMG / South Bend IN MIPR ARMY/ACC Feb 2025 Jan 2027 27 0.329 Y 2026 AMG / South Bend IN MIPR ARMY/ACC Feb 2026 Jan 2027 26 0.339 Y 2027 AMG / South Bend IN MIPR ARMY/ACC Feb 2026 Jan 2027 25 0.338 Y Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 823210 - Joint Light Tactical Vehicle Air Force UNCLASSIFIED Page 6 of 9 P-1 Line #5 Volume 1 - 14 === page 51 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 823210 / Joint Light Tactical Vehicle Appropriation / Budget Activity / Budget Sub Activity: 3080F / 02 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Joint Light Tactical Vehicle Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P JLTV, HEAVY GUNS CARRIER (HGC) 1 2025 AF 57 0 57 1 2026 AF 68 0 68 A - - - - - - - - - - - - - - - - - - - - 57 A - - - - - - - - 68 - - - - - - - - 27 A - - - - - - - - 26 JLTV, GENERAL PURPOSE (GP) W 2 2025 AF 27 0 27 2 2026 AF 26 0 26 A O C T LI 823210 - Joint Light Tactical Vehicle Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 9 S E P O C T N O V D E C J A N F E B P-1 Line #5 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 15 === page 52 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 823210 / Joint Light Tactical Vehicle Appropriation / Budget Activity / Budget Sub Activity: 3080F / 02 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Joint Light Tactical Vehicle Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E JLTV, HEAVY GUNS CARRIER (HGC) 1 2025 AF 57 0 57 - - - 57 0 1 2026 AF 68 0 68 - - - 67 1 0 JLTV, GENERAL PURPOSE (GP) W 2 2025 AF 27 0 27 - - - 27 2 2026 AF 26 0 26 - - - 24 O C T LI 823210 - Joint Light Tactical Vehicle Air Force N O V D E C J A N 2 F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 9 S E P O C T N O V D E C J A N F E B P-1 Line #5 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 16 === page 53 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 823210 / Joint Light Tactical Vehicle Appropriation / Budget Activity / Budget Sub Activity: 3080F / 02 / 3 Item Number / Title [DODIC]: Joint Light Tactical Vehicle Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 AMG - South Bend IN 2 2 68 0 0 0 0 1 5 11 16 2 AMG - South Bend IN 2 2 26 0 0 0 0 1 5 11 16 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 823210 - Joint Light Tactical Vehicle Air Force UNCLASSIFIED Page 9 of 9 P-1 Line #5 Volume 1 - 17 === page 54 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 18 === page 55 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 3: Special 823230 / Security And Tactical Vehicles Purpose Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 0.438 0.129 0.000 - 0.000 0.000 0.000 0.000 0.000 - 0.567 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 0.438 0.129 0.000 - 0.000 0.000 0.000 0.000 0.000 - 0.567 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 0.438 0.129 0.000 - 0.000 0.000 0.000 0.000 0.000 - 0.567 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: This Budget Line Item (BLI) was consolidated for the FY27 President's Budget (PB). The new BLI, 827000, improves transparency, execution, and long‑term planning. Funding provides for a variety of security and tactical vehicles essential to strategic military operations. Includes a broad class of vehicles such as trailers, combat vehicles and small unit support vehicles for security & tactical use. Designed for austere environment and adverse terrains. Provides broad range of capabilities such as base/airfield security, special tactics, tactical air control, explosive ordinance disposal, line haul, mobility, resupply and civil engineering support. Portfolio includes but is not limited to the High Mobility Multipurpose Wheeled Vehicle (HMMWV), Cold Weather All-Terrain Vehicle, Guardian Angel Air-Deployable Rescue Vehicle (GAARV), M1297 Ground Mobility Vehicle (GMV) 1.1, Bearcat, Commercial Armored Tactical Vehicles, and companion tactical trailers. Can be ordered weaponized, armored, unarmored and with or without winch systems. M1101 and M1102 light tactical trailers: The M1101 and M1102 are single axle, two-wheel trailers designed to be towed by a HMMWV. The trailers have the same tires, wheels, and track width as the HMMWV. The only difference between the M1101 and the M1102 trailer is the model information and payload capacity. The trailers have various applications and provide the forces with a light, nimble, rugged trailer built primarily for hauling cargo. FIAR Compliance Statement: - This requirement (or modification) supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Secondary Distribution AF Quantity Total Obligation Authority AFNG Quantity Total Obligation Authority AFR Quantity Total Obligation Authority LI 823230 - Security And Tactical Vehicles Air Force FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 0 0 0 0 0 - - - - 0.303 0.003 0.000 0.000 0.000 - - - - 5 3 0 0 0 - - - - 0.135 0.126 0.000 0.000 0.000 - - - - 0 0 0 0 0 - - - - 0.000 0.000 0.000 0.000 0.000 - - - - UNCLASSIFIED Page 1 of 2 P-1 Line #6 Volume 1 - 19 === page 56 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 3: Special 823230 / Security And Tactical Vehicles Purpose Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Secondary Distribution Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 5 3 0 0 0 - - - - 0.438 0.129 0.000 0.000 0.000 - - - - Justification: - BASIS FOR FY 2027 BUDGET REQUEST: This Budget Line Item (BLI) was consolidated for the FY27 President's Budget (PB). The new BLI, 827000, improves transparency, execution, and long‑term planning. LI 823230 - Security And Tactical Vehicles Air Force UNCLASSIFIED Page 2 of 2 P-1 Line #6 Volume 1 - 20 === page 57 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 3: Special 823990 / Special Purpose Vehicles Purpose Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Procurement Quantity (Units in Each) - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 92.982 69.408 0.000 - 0.000 0.000 0.000 0.000 0.000 - Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 92.982 69.408 0.000 - 0.000 0.000 0.000 0.000 0.000 - Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 92.982 69.408 0.000 - 0.000 0.000 0.000 0.000 0.000 - Total 162.390 162.390 162.390 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: This Budget Line Item (BLI) was consolidated for the FY27 President's Budget (PB). The new BLI, 827000, improves transparency, execution, and long‑term planning. The Special Purpose Vehicles group consists of various vehicles for flightline, maintenance, and facility operations used for a variety of purposes. Examples of these vehicles include an assortment of wreckers and refuse trucks, potable and non-potable water distribution trucks, refueling vehicles, deicers, staircase trucks, lavatory service trucks, high reach maintenance trucks, glycol recovery vehicles, disabled patient vehicles, high lift trucks, specialized trailers, fuel trailers, digger derrick trucks, liquid/nitrogen trucks/trailers and tow tractors. Tow tractors are used to tow aircraft, munition trailers, and ground support equipment. The wreckers are used to move disabled vehicles, haul vehicles or to deploy a heavy-duty winch. The refuse trucks in this group include one which tilts and dumps a payload and one which compacts refuse prior to discharge. Aircraft refueling vehicles refuel and defuel all military aircraft. Potable water distribution trucks provide drinking water to personnel; non-potable water distribution trucks are used primarily to wet down and control dust at construction sites. The FY 2026 spend plan amount for 3080 includes 69,408 thousand of discretionary and 7,000 thousand of mandatory (reconciliation) for a total of 76,408 thousand. FIAR Compliance Statement: - This requirement (or modification) supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Secondary Distribution AF Quantity Total Obligation Authority AFNG Quantity Total Obligation Authority AFR Quantity Total Obligation Authority LI 823990 - Special Purpose Vehicles Air Force FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 370 228 0 0 0 - - - - 85.311 58.873 0.000 0.000 0.000 - - - - 26 25 0 0 0 - - - - 5.766 5.817 0.000 0.000 0.000 - - - - 8 17 0 0 0 - - - - 1.905 4.718 0.000 0.000 0.000 - - - - UNCLASSIFIED Page 1 of 2 P-1 Line #7 Volume 1 - 21 === page 58 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 3: Special 823990 / Special Purpose Vehicles Purpose Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Secondary Distribution Total: Secondary Distribution Quantity Total Obligation Authority FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 404 270 0 0 0 - - - - 92.982 69.408 0.000 0.000 0.000 - - - - Justification: - BASIS FOR FY 2027 BUDGET REQUEST: This Budget Line Item (BLI) was consolidated for the FY27 President's Budget (PB). The new BLI, 827000, improves transparency, execution, and long‑term planning. LI 823990 - Special Purpose Vehicles Air Force UNCLASSIFIED Page 2 of 2 P-1 Line #7 Volume 1 - 22 === page 59 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 4: Fire Fighting Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 824010 / Fire Fighting/Crash Rescue Vehicles Program Elements for Code B Items: N/A Other Related Program Elements: 0202834F, 0901279F Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Procurement Quantity (Units in Each) - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 57.234 59.498 0.000 - 0.000 0.000 0.000 0.000 0.000 - Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 57.234 59.498 0.000 - 0.000 0.000 0.000 0.000 0.000 - Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 57.234 59.498 0.000 - 0.000 0.000 0.000 0.000 0.000 - Total 116.732 116.732 116.732 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: This Budget Line Item (BLI) was consolidated for the FY27 President's Budget (PB). The new BLI, 827000, improves transparency, execution, and long‑term planning. This P-1 line procures a variety of critical firefighting and crash rescue vehicles. Vehicles typically include, but are not limited to, the following: -- The P-19 Crash Truck is an Air Rescue and Fire Fighting (ARFF) vehicle that is a first response vehicle on the scene of an aircraft fire emergency. It equips bases with the capability to rapidly extinguish aircraft fires. This truck is a mandatory flight line operations safety requirement and is essential at bases with a flying mission. The P-19 also provides fire fighting capability for Air National Guard and Air Force Reserve installations located at municipal airports. An installation's P-19 requirement is determined by the type of aircraft frequenting the aerial facility and the resulting gallons per minute of fire fighting agent required. This vehicle provides aircrew, passenger, weapons, and airframe fire protection at a crash site. -- The P-21 Aerial Lift Truck is a fire fighting vehicle with a 105 foot aerial ladder. It provides improved agent delivery over older model vehicles, as well as the capability to provide elevated delivery of agent involving high rise buildings and warehouse facilities. -- The P-22 4x2 and P-24 4x4 Pumper Trucks are designed primarily to fight structural fires. The trucks have a 750-gallon water tank and a 50-gallon Aqueous FilmFoam class "A" foam tank and are capable of applying 1250 gallons per minute. P-24 is built on a rugged 4x4 chassis that equips forces with limited off-road/rugged terrain capability. The P-22 4x2 Pumper Truck has the same fire fighting capability as the P-24, but is used in urban areas. -- The P-23 Crash Truck is a larger version of the P-19 ARFF truck and has a larger fire suppression capacity. It is primarily assigned at transport, bomber, depot, and cargo aircraft bases. -- The P-26 Water Tanker Truck is a 4000-gallon resupply truck used to support the ARFF vehicles, fight wild land fires, and provide mutual assistance to communities. -- The P-29 Wild Land Firefighting Truck is a four-person crew cab truck which contains a modular agent and pump and roll delivery system as well as firefighting tools and equipment. This truck is outfitted with a Compressed Air Foam System (CAFS) and has a 500 gallon water tank. The truck is intended to combat wild land and brush type fires. LI 824010 - Fire Fighting/Crash Rescue Vehicles Air Force UNCLASSIFIED Page 1 of 2 P-1 Line #8 Volume 1 - 23 === page 60 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 4: Fire Fighting Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 824010 / Fire Fighting/Crash Rescue Vehicles Program Elements for Code B Items: N/A Other Related Program Elements: 0202834F, 0901279F Line Item MDAP/MAIS Code: N/A -- The P-30 is a Medium Rescue Vehicle. It is designed to bring equipment, lighting, a winch, and a generator to the scene of a rescue event. This vehicle has 450 cubic feet of storage space and affords easy equipment access and improved storage compartments. This truck is assigned to the larger industrial bases. -- The P-31 Hazardous Material Vehicle is a dual purpose vehicle that stows and transports hazardous material response equipment for the purpose of mitigating chemical leaks, spills, and releases. This vehicle also provides an incident command workstation area for the purpose of research, command, control, and communications during containment/cleanup operations. -- The P-33 Quint Truck is a fire fighting truck with a 75 foot aerial ladder. It provides improved agent delivery over older models as well as the capability to provide elevated delivery of agent involving high rise and warehouse facilities. -- The P-34 is a first response Air Rescue and Fire Fighting (ARFF) vehicle which equips forces with initial "knock down" capability. The P-34 is the first fire truck to employ Ultra High Pressure (UHP) technology which allows the vehicle to discharge a mixture of water and foam at 1350 psi. This UHP technology makes the vehicle three times more effective than a conventional ARFF truck. The truck has a 400 gallon water tank and a 50 gallon foam tank along with a bumper turret and 200 feet of hand line all mounted on an F-550 chassis. -- The Rapid Intervention Vehicle (RIV) is a first response aircraft fire truck; it is the newest addition to the Air Force's fleet of crash response vehicles. The RIV is the first vehicle in the AF to use new Ultra High Pressure (UHP) fire fighting technology which makes this truck 3 to 3.5 times more efficient at knock-down than conventional ARFF vehicles. This feature increases the length of time the vehicle can remain on the scene without having to be resupplied. Perched on an F550 chassis, the RIV is equipped with a 4-wheel drive train; it provides seating for four, equips fire fighters with limited storage for rescue equipment; has a bumper turret, a 200 ft hand line and a winch. Because of its size, speed and agility this truck can get to a crash scene quickly and perform fire fighting operations until the larger trucks can arrive at the scene. These vehicles are all built to meet the performance standards of the National Fire Protection Association (NFPA), Occupational Safety and Health Administration (OSHA), Federal Aviation Administration (FAA), and Air Force safety regulations. "This requirement [or modification] supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D "Audits: audit of financial statements of Department of War components by independent external auditors. In accordance with Section 1815 of the FY2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. Justification: This Budget Line Item (BLI) was consolidated for the FY27 President's Budget (PB). The new BLI, 827000, improves transparency, execution, and long‑term planning. LI 824010 - Fire Fighting/Crash Rescue Vehicles Air Force UNCLASSIFIED Page 2 of 2 P-1 Line #8 Volume 1 - 24 === page 61 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 825990 / Materials Handling Vehicles Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 5: Materials Handling Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 18.359 18.722 2.132 - 2.132 0.000 0.000 0.000 0.000 - 39.213 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 18.359 18.722 2.132 - 2.132 0.000 0.000 0.000 0.000 - 39.213 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 18.359 18.722 2.132 - 2.132 0.000 0.000 0.000 0.000 - 39.213 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: This Budget Line Item (BLI) was consolidated for the FY27 President's Budget (PB). The new BLI, 827000, improves transparency, execution, and long‑term planning. This program includes various material handling vehicles with an individual item procurement value of less than 5M. These vehicles consist of Forklifts, Container Handlers, Baggage Conveyors, Warehouse Tugs and Warehouse Cranes critical to Depot and Base Supply Operations. Locomotive procurement is accomplished on an as needed basis to assist in DoW's mission to replace the ones nearing end of service and to modernize the aging railroad infrastructure. The FY 2026 spend plan amount for 3080 includes 18,722 thousand of discretionary and 7,400 thousand of mandatory (reconciliation) for a total of 26,122 thousand. The remaining 2,132 thousand in BPAC 825990 reflects a Defense Logistics Agency (DLA) adjustment. These funds will be realigned to the correct BPAC (827000) in the execution year. FIAR Compliance Statement: - This requirement (or modification) supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Secondary Distribution AF Quantity Total Obligation Authority AFNG Quantity Total Obligation Authority AFR Quantity Total Obligation Authority Total: Quantity LI 825990 - Materials Handling Vehicles Air Force FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 97 135 27 0 27 - - - - 18.359 17.738 2.132 0.000 2.132 - - - - 0 6 0 0 0 - - - - 0.000 0.984 0.000 0.000 0.000 - - - - 0 0 0 0 0 - - - - 0.000 0.000 0.000 0.000 0.000 - - - - 97 141 27 0 27 - - - - UNCLASSIFIED Page 1 of 2 P-1 Line #9 Volume 1 - 25 === page 62 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 825990 / Materials Handling Vehicles Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 5: Materials Handling Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Secondary Distribution Secondary Distribution Total Obligation Authority FY 2025 18.359 FY 2026 18.722 FY 2027 Base FY 2027 OOC 2.132 0.000 FY 2027 Total FY 2028 2.132 FY 2029 - FY 2030 - FY 2031 - - Justification: - BASIS FOR FY 2027 BUDGET REQUEST: This Budget Line Item (BLI) was consolidated for the FY27 President's Budget (PB). The new BLI, 827000, improves transparency, execution, and long‑term planning. LI 825990 - Materials Handling Vehicles Air Force UNCLASSIFIED Page 2 of 2 P-1 Line #9 Volume 1 - 26 === page 63 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 826210 / Runway Snow Remov And Cleaning Equ Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 6: Base Maintenance Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 8.780 11.045 0.000 - 0.000 0.000 0.000 0.000 0.000 - 19.825 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 8.780 11.045 0.000 - 0.000 0.000 0.000 0.000 0.000 - 19.825 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 8.780 11.045 0.000 - 0.000 0.000 0.000 0.000 0.000 - 19.825 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: This Budget Line Item (BLI) was consolidated for the FY27 President's Budget (PB). The new BLI, 827000, improves transparency, execution, and long‑term planning. This program procures snow removal vehicles and commercial sweepers used on all airfield surfaces to remove snow and help prevent foreign object damage (FOD) to aircraft engines and tires. Snow removal equipment includes front mounted brooms, multi-purpose blowers, and plows. These vehicles provide critical mission support to airfield operations because fighter aircraft cannot land or take off with ice on the runway. Multi-purpose vacuum sweepers maintain airfields, roads, and grounds. Vacuum sweepers provide equally important support at all air bases due to the high cost of FOD and the potential for loss in FOD-related engine accidents. These assets are critical to the Air Force mission. They are the primary equipment used for snow, ice, and debris removal from runways and taxiways year-round. The vital functions of these vehicles prevent the closing of airfields due to debris and/or snow and ice buildup. The FY 2026 spend plan amount for 3080 includes 11,045 thousand of discretionary and 1,000 thousand of mandatory (reconciliation) for a total of 12,045 thousand. FIAR Compliance Statement: - This requirement (or modification) supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Secondary Distribution AF FY 2025 Quantity Total Obligation Authority AFNG Quantity Total Obligation Authority AFR Quantity Total Obligation Authority LI 826210 - Runway Snow Remov And Cleaning Equ Air Force FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 16 14 0 0 0 - - - - 7.468 7.501 0.000 0.000 0.000 - - - - 1 3 0 0 0 - - - - 0.445 1.772 0.000 0.000 0.000 - - - - 2 3 0 0 0 - - - - 0.867 1.772 0.000 0.000 0.000 - - - - UNCLASSIFIED Page 1 of 2 P-1 Line #10 Volume 1 - 27 === page 64 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 826210 / Runway Snow Remov And Cleaning Equ Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 6: Base Maintenance Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Secondary Distribution Total: Secondary Distribution FY 2025 Quantity Total Obligation Authority FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 19 20 0 0 0 - - - - 8.780 11.045 0.000 0.000 0.000 - - - - Justification: - BASIS FOR FY 2027 BUDGET REQUEST: This Budget Line Item (BLI) was consolidated for the FY27 President's Budget (PB). The new BLI, 827000, improves transparency, execution, and long‑term planning. LI 826210 - Runway Snow Remov And Cleaning Equ Air Force UNCLASSIFIED Page 2 of 2 P-1 Line #10 Volume 1 - 28 === page 65 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 826990 / Base Maintenance Support Vehicles Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 6: Base Maintenance Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Procurement Quantity (Units in Each) - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 92.686 28.711 0.000 - 0.000 0.000 0.000 0.000 0.000 - Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 92.686 28.711 0.000 - 0.000 0.000 0.000 0.000 0.000 - Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 92.686 28.711 0.000 - 0.000 0.000 0.000 0.000 0.000 - Total 121.397 121.397 121.397 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: This Budget Line Item (BLI) was consolidated for the FY27 President's Budget (PB). The new BLI, 827000, improves transparency, execution, and long‑term planning. This vehicle group consists of armored loaders and dozers, water distribution trucks, and heavy construction equipment (dozers, large cranes, large dump trucks, rock crushers, motorized scrapers, well-drilling vehicles, compactors, wheel loaders, graders, cement mixers, paving machines, excavators, sewer trucks, refuse trucks, trenches and backhoes). The assets are critical to the Air Force mission and are crucial to keeping sortie generation/sortie sustainment missions supported and operational. The types of items contained in this category document are critical (deployed) assets used in direct support of Air Force units engaged in contingency operations. The FY 2026 spend plan amount for 3080 includes 28,711 thousand of discretionary and 14,000 thousand of mandatory (reconciliation) for a total of 42,711 thousand. FIAR Compliance Statement: - This requirement (or modification) supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Secondary Distribution AF Quantity Total Obligation Authority AFNG Quantity Total Obligation Authority AFR Quantity Total Obligation Authority Total: Quantity LI 826990 - Base Maintenance Support Vehicles Air Force FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 57 105 0 0 0 - - - - 91.705 27.391 0.000 0.000 0.000 - - - - 6 6 0 0 0 - - - - 0.693 1.320 0.000 0.000 0.000 - - - - 2 0 0 0 0 - - - - 0.288 0.000 0.000 0.000 0.000 - - - - 65 111 0 0 0 - - - - UNCLASSIFIED Page 1 of 2 P-1 Line #11 Volume 1 - 29 === page 66 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 826990 / Base Maintenance Support Vehicles Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 6: Base Maintenance Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Secondary Distribution Secondary Distribution Total Obligation Authority FY 2025 92.686 FY 2026 28.711 FY 2027 Base FY 2027 OOC 0.000 0.000 FY 2027 Total FY 2028 0.000 FY 2029 - FY 2030 - FY 2031 - - Justification: - BASIS FOR FY 2027 BUDGET REQUEST: This Budget Line Item (BLI) was consolidated for the FY27 President's Budget (PB). The new BLI, 827000, improves transparency, execution, and long‑term planning. LI 826990 - Base Maintenance Support Vehicles Air Force UNCLASSIFIED Page 2 of 2 P-1 Line #11 Volume 1 - 30 === page 67 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 827000 / Mission Support Vehicles Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 7: Mission Support Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 Procurement Quantity (Units in Each) - - - 1,740 - 1,740 345 6 Gross/Weapon System Cost ($ in Millions) - 0.000 0.000 439.892 - 439.892 375.035 389.748 Less PY Advance Procurement ($ in Millions) - - - Net Procurement (P-1) ($ in Millions) - 0.000 0.000 Plus CY Advance Procurement ($ in Millions) - - - Total Obligation Authority ($ in Millions) - 0.000 0.000 - - 439.892 - - 439.892 - 439.892 439.892 375.035 375.035 389.748 389.748 481.836 481.836 481.836 To FY 2031 Complete 380.838 380.838 380.838 Total - 2,091 - 2,067.349 - 2,067.349 - 2,067.349 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - 0.253 - 0.253 1.087 64.958 - - - 0.989 Description: This Budget Line Item (BLI) was consolidated for the FY27 President's Budget (PB). The exhibit includes funding from BLIs 821800, 822230, 822910, 822990, 823230, 823990, 824010, 825990, 826210, 826990. The new BLI, 827000, improves transparency, execution, and long-term planning. BLI 827000 funds procurement of Tactical and non-Tactical vehicles used to support multiple functions and missions at all levels of the Air Force. Without the procurement of these vehicles, the Air Force will not have the ability to support the broad spectrum of Air Force operations. - Passenger Carrying Vehicles (PCV) include the procurement of sedans, law enforcement sedans, ambulances, armored sedans, small buses, transit buses, large buses, intra-city motorcoaches, and work buses. These vehicles are general in nature, but they fulfill unique and distinct needs commensurate with their design. Specific uses for Passenger Carrying Vehicles include, but are not limited to, sedans used by the Office of Special Investigations (OSI); law enforcement sedans used by security forces personnel for emergency response, traffic control, patrol duties, and base security operations; ambulances used for the movement of patients under field conditions, aircraft crash rescue operations, and routine transportation of patients to and from medical facilities; and buses used to support Air Education and Training Command (AETC) training units, Air Force band organizations, protocol offices, and several other missions. - Medium Tactical Vehicles (MTV) include a broad class of medium and heavy military specification vehicles with the capability to operate in austere and adverse terrain. They include, but are not limited to Cargo Trucks, Wreckers, Dump Trucks, Tractors, Mobilizers, and Medium and Heavy Tactical Trailers. They provide a range of capabilities such as line haul, mobility, resupply, maintenance, recovery, construction and civil engineering support. They can be ordered with armor and winch systems. These tactical vehicles are used by Combat Communication Units, Air Support Operations Squadrons (ASOS), Explosive Ordinance Disposal units (EOD), and other direct mission support units throughout the Air Force. - Civil Air Patrol (CAP) vehicle procurements support the Civil Air Patrol—a Congressionally chartered non‑profit corporation that serves as the Auxiliary of the Air Force—in executing emergency and non‑emergency public‑purpose missions for the Department of War and federal, state, local, and non‑governmental authorities. CAP maintains a fleet of approximately 1,060 vehicles supporting 58,000 volunteers, including ground teams that provide critical communications, search and rescue support for 90 percent of Air Force SAR missions under the National Search and Rescue Plan, disaster relief operations, and humanitarian assistance. Vehicles also enable transportation and program execution for more than 26,000 cadets participating in Aerospace Education and Cadet Program activities authorized under 36 U.S.C. §403 and 10 U.S.C. §9442. Forty‑two percent of CAP's fleet exceeds the average Air Force vehicle age, and vehicle procurement costs have increased nearly 200 percent since CAP's baseline was established in 2006. Vehicle types and quantities may vary in the year of execution due to market availability, cost fluctuations, mission requirements, and organizational needs. CAP procurements are executed under Department of War Grant and Agreement Regulations (DoWGARs); standard Air Force central procurement processes do not apply. LI 827000 - Mission Support Vehicles Air Force UNCLASSIFIED Page 1 of 20 P-1 Line #12 Volume 1 - 31 === page 68 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 7: Mission Support Vehicles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 827000 / Mission Support Vehicles Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A - Cargo and Utility Vehicles (CUV): Items Less Than 5M include pickup trucks, trailers, semi-trailers, trucks, vans, utility trucks, maintenance vehicles, armored utility vehicles, cargo truck, truck tractors, armored sport utility vehicles, sport utility vehicles, and facility vehicles essential to base and flying operations. These assets are vital to the Air Force mission and are essential to flight line operations (aircraft maintenance), depot maintenance, component routing to depot back shops and airfield maintenance, and Air Base Civil Engineers performing base housing maintenance and repairs. These items are critical across the spectrum of functional users throughout the Air Force and provide multi-purpose capabilities. These vehicles also support light to heavy cargo transport mission needs as well as transportation of air/ flight crew personnel. Cargo utility vehicles also provide heavy cargo movement for civil engineering and construction projects. - Special Purpose Vehicles (SPV): Security and Tactical Vehicles include a broad class of vehicles such as trailers, combat vehicles and small unit support vehicles for security & tactical use. Designed for austere environment and adverse terrains, these vehicles support a broad range of capabilities such as base/airfield security, special tactics, tactical air control, explosive ordinance disposal, line haul, mobility, resupply and civil engineering support. The portfolio includes but is not limited to the High Mobility Multipurpose Wheeled Vehicle (HMMWV), Cold Weather All-Terrain Vehicle, Guardian Angel Air-Deployable Rescue Vehicle (GAARV), M1297 Ground Mobility Vehicle (GMV) 1.1, Bearcat, Commercial Armored Tactical Vehicles, and companion tactical trailers. These assets can be ordered weaponized, armored, unarmored and with or without winch systems. This class includes M1101 and M1102 light tactical trailers. The M1101 and M1102 are single axle, two-wheel trailers designed to be towed by a HMMWV. The trailers have the same tires, wheels, and track width as the HMMWV. The only difference between the M1101 and the M1102 trailer is the model information and payload capacity. The trailers have various applications and provide the forces with a light, nimble, rugged trailer built primarily for hauling cargo. - Special Purpose Vehicles (SPV): Items Less Than 5M include various vehicles for flightline, maintenance, and facility operations used for a variety of purposes. Examples of these vehicles include an assortment of wreckers and refuse trucks, potable and non-potable water distribution trucks, refueling vehicles, deicers, staircase trucks, lavatory service trucks, high reach maintenance trucks, glycol recovery vehicles, disabled patient vehicles, high lift trucks, specialized trailers, fuel trailers, digger derrick trucks, liquid/nitrogen trucks/trailers and tow tractors. Tow tractors are used to tow aircraft, munition trailers, and ground support equipment. The wreckers are used to move disabled vehicles, haul vehicles or to deploy a heavy-duty winch. The refuse trucks in this group include both tilts-and-dump and compaction models. Aircraft refueling vehicles refuel and defuel all military aircraft. Potable water distribution trucks provide drinking water to personnel; non-potable water distribution trucks are used primarily to wet down and control dust at construction sites. - Fire Fighting Equipment: Fire Fighting/Crash Rescue Vehicles include a variety of critical firefighting and crash rescue vehicles. These vehicles are all built to meet the performance standards of the National Fire Protection Association (NFPA), Occupational Safety and Health Administration (OSHA), Federal Aviation Administration (FAA), and Air Force safety regulations. Vehicles typically include, but are not limited to: o The P-19 Crash Truck - an Air Rescue and Fire Fighting (ARFF) vehicle that is the first response vehicle on the scene of an aircraft fire emergency o The P-21 Aerial Lift Truck - a fire fighting vehicle with a 105-foot aerial ladder o The P-22 4x2 and P-24 4x4 Pumper Trucks - designed primarily to fight structural fires o The P-23 Crash Truck - a larger version of the P-19 ARFF truck and has a larger fire suppression capacity o The P-26 Water Tanker Truck - a 4000-gallon resupply truck used to support the ARFF vehicles, fight wild land fires, and provide mutual assistance to communities o The P-29 Wild Land Firefighting Truck - a four-person crew cab truck which contains a modular agent and pump and roll delivery system as well as firefighting tools and equipment o The P-30 Medium Rescue Vehicle - designed to bring equipment, lighting, a winch, and a generator to the scene of a rescue event o The P-31 Hazardous Material Vehicle - a dual-purpose vehicle that stows and transports hazardous material response equipment for the purpose of mitigating chemical leaks, spills, and releases o The P-33 Quint Truck - a firefighting truck with a 75-foot aerial ladder that provides improved agent delivery over older models as well as the capability to provide elevated delivery of agent involving high rise and warehouse facilities o The P-34 first response Air Rescue and Fire Fighting (ARFF) vehicle - equips forces with initial "knock down" capability. The P-34 is the first fire truck to employ Ultra High Pressure (UHP) technology o The Rapid Intervention Vehicle (RIV) - a first response aircraft fire truck; it is the newest addition to the Air Force's fleet of crash response vehicles. The RIV is the first vehicle in the AF to use new Ultra High Pressure (UHP) firefighting technology which makes this truck 3 to 3.5 times more efficient at knock-down than conventional ARFF vehicles These vehicles are all built to meet the performance standards of the National Fire Protection Association (NFPA), Occupational Safety and Health Administration (OSHA), Federal Aviation Administration (FAA), and Air Force safety regulations. LI 827000 - Mission Support Vehicles Air Force UNCLASSIFIED Page 2 of 20 P-1 Line #12 Volume 1 - 32 === page 69 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 827000 / Mission Support Vehicles Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 7: Mission Support Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A In accordance with Section 1815 of the FY2008 National Defense Authorization Act (P.L. 110-181), these items are necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. - Materials Handling Equipment (MHE): Items Less Than 5M includes various material handling vehicles with an individual item procurement value of less than 5M. These vehicles consist of forklifts, container handlers, baggage conveyors, warehouse tugs and warehouse cranes critical to depot and base supply operations. Locomotive procurement is accomplished on an as needed basis to assist in DoW's mission to replace the ones nearing end of service and to modernize the aging railroad infrastructure. - Base Maintenance Support (BMS) Runway Snow Removal and Cleaning includes snow removal vehicles and commercial sweepers used on all airfield surfaces to remove snow and help prevent foreign object damage (FOD) to aircraft engines and tires. Snow removal equipment includes front mounted brooms, multi-purpose blowers, and plows. These vehicles provide critical mission support to airfield operations because fighter aircraft cannot land or take off with ice on the runway. Multi-purpose vacuum sweepers maintain airfields, roads, and grounds. Vacuum sweepers provide equally important support at all air bases due to the high cost of FOD and the potential for loss in FOD-related engine accidents. These assets are critical to the Air Force mission. They are the primary equipment used for snow, ice, and debris removal from runways and taxiways year-round. The vital functions of these vehicles prevent the closing of airfields due to debris and/or snow and ice buildup. - Base Maintenance Support (BMS): Items Less Than 5M includes armored loaders and dozers, water distribution trucks, and heavy construction equipment (dozers, large cranes, large dump trucks, rock crushers, motorized scrapers, well-drilling vehicles, compactors, wheel loaders, graders, cement mixers, paving machines, excavators, sewer trucks, refuse trucks, trenches and backhoes). The assets are critical to the Air Force mission and are crucial to keeping sortie generation/sortie sustainment missions supported and operational. The types of items contained in this category are critical (deployed) assets used in direct support of Air Force units engaged in contingency operations. FIAR Compliance Statement: - "This requirement (or modification) supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D." **Funding for this exhibit contained in PEs: 0101113F, 0204424F, 0207142F, 0207430F, 0207597F, 0208028F, 0208853F, 0404011F, 0502831F, 0507831F, 0702831F, 0804701F, 0901223F, and 0901279F In direct support of SECWAR direction to increase readiness across the Department of War (DoW), efforts within this PEC will be prioritized based on the National Defense Authorization Act (NDAA), USAF Force Design, Agile Combat Employment (ACE), and the Defense Planning Guide (DPG). These efforts will support work and collaboration efforts across the Combat Readiness Directorate in PEs 0708051F, 0701212F, 0702833F, 0604706F, 0605827F, 0202834F, 0502834F, 0208031F, 0401135F and 0207521F -- to increase readiness across the Air Force Enterprise. Secondary Distribution AF Quantity Total Obligation Authority AFNG Quantity Total Obligation Authority AFR Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 827000 - Mission Support Vehicles Air Force FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 0 0 1,482 0 1,482 - - - - 0.000 0.000 396.651 0.000 396.651 - - - - 0 0 201 0 201 - - - - 0.000 0.000 31.709 0.000 31.709 - - - - 0 0 57 0 57 - - - - 0.000 0.000 11.532 0.000 11.532 - - - - 0 0 1,740 0 1,740 - - - - 0.000 0.000 439.892 0.000 439.892 - - - - UNCLASSIFIED Page 3 of 20 P-1 Line #12 Volume 1 - 33 === page 70 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 827000 / Mission Support Vehicles Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 7: Mission Support Vehicles ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Mission Support Vehicles - / - - / 0.000 - / 0.000 P-40 Total Gross/Weapon System Cost - / - - / 0.000 - / 0.000 / 439.892 - / - 1,740 / 439.892 - - / - - / 439.892 1,740 / 439.892 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: BASIS FOR FY 2027 BUDGET REQUEST: - FY2027 procurement dollars in the amount of 439.892 million will be to procure, but not limited to, 1,740 vehicles in support of installation and unit mission requirements for Air Force personnel. Due to a Defense Logistics Agency (DLA) adjustment, this BLI will receive 2,132 thousand currently in BPAC 825990. These funds will be realigned in the execution year. Subcategories regrouped to provide more accurate average costs. Quantities are based on current requirements provided by the 441 Vehicle Support Chain Operations Squadron (VSCOS) IAW the process outlined in AFI 24-302, Vehicle Management. The requirements are generated from the priority buy model that is used to support the Planning, Programming, Budgeting and Execution (PPBE) process. The model calculates vehicle requirements by fund year by Budget & Program Activity Code (BPAC) using end of life projections based on depreciation and service life of the vehicle, cumulative sustainment cost and mission priority. Quantities will vary year by year based on endof-life projections. As the priority buy model applies the life expectancy/sustainment cost/mission priority logic in generating procurement requirements, there can be gaps in individual vehicle type procurement from year-to-year. Quantities reflected on the Procurement Document (PDOC) show current requirements for each year supporting Active Duty, Air Force Reserve Center (AFRC), Air National Guard (ANG), Rapid Airfield Damage Repair (RADR), Regional Base Cluster Prepositioning Kits (RBCP) for Pacific Command (PACOM), and other initiatives as they arise. Unit costs are subject to change year-to-year based on buy quantities, contiguous United States/outside the contiguous United States (CONUS/OCONUS) delivery locations, inflation and additional requirements (options required by users). Specific examples of options include, but are not limited to, specialized trailer towing packages, export (non-Ultra Low Sulfur Diesel) engines, and mission-specific specialized attachments for construction vehicles. Unit costs are also subject to change based on fluctuations in contract pricing. Funding constraints significantly affect the ability to procure required vehicles and trailers. Consequently, quantities and types of vehicles/trailers procured are based on the amount of funding authorized each fiscal year. Authorized funding below requested amount will cause reduced vehicle/trailer procurements, resulting in prolonged fielding of vehicles past the end of their service life, driving increased maintenance costs associated with keeping legacy vehicles serviceable until replacement is accomplished and inflated vehicle prices in future years. PDI Statement: - Fiscal Year (FY) 2027 Pacific Deterrence Initiative (PDI) funding accounted for in the Base budget totals 487 thousand and supports Civil Engineering Squadron Heavy Repair (RED HORSE) air base construction and other heavy construction needs. Increase/Decrease narratives: LI 827000 - Mission Support Vehicles Air Force UNCLASSIFIED Page 4 of 20 P-1 Line #12 Volume 1 - 34 === page 71 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 02: Vehicular Equipment / BSA 7: Mission Support Vehicles ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 827000 / Mission Support Vehicles Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Unit cost increases for all FY27 vehicle acquisition efforts are attributed to parts shortages, import fees on vehicle manufacturers and subcomponent producers, and importation of raw materials, inflation, and rising transportation/delivery costs associated with increased fuel prices. In addition, continued higher demand for a smaller pool of finished vehicles due to a shortage of vehicles from stagnant production during the pandemic also played a key role. These factors also reduced the number of viable competitors in the marketplace which also drove up costs. In addition, a significant decline of technically acceptable quotes from some vendors, to include "No Quotes" and non-responsiveness have diminished competition in the acquisition process, further contributed to higher unit prices. Vehicles purchased through DLA contracts have also seen price increases averaging 10% due to inflation, far above forecast inflation projections of 3-5%. For Medium Tactical and Security and Tactical Vehicles, the Air Force follows the Primary Inventory Control Agency (Army) procurement process and procurement of the most current model/design is made through a TACOM (Army) contract. The Army, which is the Primary Inventory Control Activity (PICA), anticipates an increase in vehicle prices on the Family of Medium Tactical Vehicles (FMTV) for the 3-year contract extension set. With several contracts due to expire in the outyears, higher costs over the FYDP are expected as contracts expire and are re-competed/awarded. The following vehicles have seen a 6% or higher increase in unit costs: - Passenger Carrying Vehicles (PCV) - Intra City Motorcoaches (14%). - Medium Tactical Vehicles (MTV) - M Series Trucks (12%), and Trailers (9%). - Cargo and Utility Vehicles (CUV): Items Less Than 5M - Vans/Multi-stops (9%), Truck Stake & Platforms (7%), SUVs (13%), Law Enforcement Patrol & Military Working Dog Vehicles (8%), Small Trailers (53%) and Large Trailers (9%). - Special Purpose Vehicles (SPV): Security and Tactical Vehicles - Cargo Trailer (7%). FY27 request was reduced to 0 for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, implementing the President's Department of Government Efficiency Cost Efficiency Initiatives. - Special Purpose Vehicles (SPV): Items Less Than 5M - Truck Refuelers (21%), Truck Digger Derricks (15%), Trucks High Reach (19%), Trucks Lavatory (45%), and Trucks Maint Small (29%). - Fire Fighting Equipment: Fire Fighting/Crash Rescue Vehicles - FFGT Pumpers (61%), FFGT Water Tankers (33%) and ARFF (35%). We continue to monitor vendor availability and its effect on cost. In particular, the Air Transportable P-19C, with the highest price point in the portfolio, has only one certified vendor on contract. - Materials Handling Equipment (MHE): Items Less Than 5M - Forklifts 4-6K (7%), Forklift 10K Nuke (34%), Forklifts 10-15K Diesel (36%), Forklifts 10K Telehandler (7%), Forklifts 20-25K Rough Terrain (59%) and Conveyor Belts (28%). - Base Maintenance Support (BMS) Runway Snow Removal and Cleaning - While no single asset saw cost growth exceeding 6% for FY27, unit prices continue to be elevated following a 12%-14% unit price increase for snowplows spanning FY23-FY25 and a 35% unit price increase for runway sweepers since FY25. - Base Maintenance Support (BMS): Items Less Than 5M - Farm Tractors (148%), Dozers (9%), Large Dump Trucks (7%), Excavators (12%), Graders (32%). LI 827000 - Mission Support Vehicles Air Force UNCLASSIFIED Page 5 of 20 P-1 Line #12 Volume 1 - 35 === page 72 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 827000 / Mission Support Vehicles Appropriation / Budget Activity / Budget Sub Activity: 3080F / 02 / 7 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: Mission Support Vehicles FY 2026 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Cargo & Utility Vehicles - 822990 Pacific Resilient Distributed Air Basing A - - - - - - - AF - AFNG - - - - - - - - 0.000 - 0.000 - - - - - - - - - - - - - 0.000 - 0.000 - - - - - - - - - - - - - - - - - - - - - - - - Secondary Distribution AF TRUCK CARGO A - - - - - 33 4.290 - 32 4.160 - - 1 0.130 - 63 18.900 - - - - - - 0.130 - - - 33 4.290 - 32 4.160 - 1 0.130 63 18.900 0.130 Secondary Distribution ARMORED UTILITY VEHICLES A - - - 0.300 - 0.300 Secondary Distribution AF EOD RESPONSE VEHICLE A - - - 63 18.900 0.102 11 1.122 11 1.122 - - - - - - 8 0.880 - - 63 18.900 0.102 11 1.122 11 1.122 - - - - - - 0.110 Secondary Distribution AF - - - - - - - - 0.000 - - - - - - - - - - - - - - - - 0.110 AF - - - - - - 4 0.440 - AFNG - - - - - - 4 0.440 - - - - - - - 30 7.050 - - - - - - - - 30 7.050 - - - - - - - - 127 6.350 - - AF - - - - - - 107 5.350 - AFNG - - - - - - 14 0.700 - AFR - - - - - - 6 0.300 - - - - - - 87 4.785 AF - - - - - - 60 AFNG - - - - - - 19 Ukraine Offset Supplemental A TRUCK MIL SPEC & F450 A 8 0.880 - 4 0.440 - 4 0.440 30 7.050 30 7.050 127 6.350 - 107 5.350 - 14 0.700 - - 6 0.300 - - 87 4.785 3.300 - - 60 3.300 1.045 - - 19 1.045 Secondary Distribution TRUCK TRACTORS A - - - 0.235 - 0.235 Secondary Distribution AF PASSENGER CARRYING TRUCKS 4X2 A - - - 0.050 - 0.050 Secondary Distribution PASSENGER CARRYING TRUCKS 4X4 A - - - 0.055 - 0.055 Secondary Distribution LI 827000 - Mission Support Vehicles Air Force UNCLASSIFIED Page 6 of 20 P-1 Line #12 Volume 1 - 36 === page 73 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 827000 / Mission Support Vehicles Appropriation / Budget Activity / Budget Sub Activity: 3080F / 02 / 7 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) AFR FY 2025 Total Cost Unit Cost ($ M) ($ M) - - - - 0.000 - - - AF - AFNG - AFR Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($ M) - - - - - - - - - - - - - - - - 0.000 - - - AF - AFNG - AFR TRUCKS, SPECIAL DESIGN 4X4 A VANS / MULTISTOPS A Aggregated Items Title: Mission Support Vehicles Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) 8 ($ M) - - 0.440 - - - - - - - - - 0.058 105 6.090 - - - 56 - - - 36 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) - - 8 0.440 - - - - - - - - - 0.058 105 6.090 3.248 - - 56 3.248 2.088 - - 36 2.088 13 0.754 - - 13 0.754 - - - - - - - - - 0.079 85 6.715 - - - 0.079 85 6.715 - 70 5.530 - - 70 5.530 - 10 0.790 - - 10 0.790 - - 5 0.395 - - 5 0.395 - - 1 0.051 - - 1 0.051 1 0.051 1 0.051 Secondary Distribution TRUCK CARRYALLS A TRUCK STAKE AND PLATFORMS A Secondary Distribution SPORTS UTILITY VEHICLES A - - - 0.051 - 0.051 Secondary Distribution AF - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - - - - - - - - 0.080 29 2.320 - - - 0.080 29 2.320 AF - - - - - - 28 2.240 - - 28 2.240 AFR - - - - - - 1 0.080 - - 1 0.080 - - - - - - 0.061 8 0.488 - - 0.061 8 0.488 - - - - - - 8 0.488 - - 8 0.488 - - - - - - 0.072 67 4.824 - - 0.072 67 4.824 AF - - - - - - 47 3.384 - - 47 3.384 AFNG - - - - - - 20 1.440 - - 20 1.440 - - - - - - - 0.020 - - - 0.020 - - - - - - - 0.020 - - - 0.020 ARMORED SPORTS UTILITY VEHICLES A LAW ENFORCEMENT PATROL & MILITARY WORKING DOG VEHICLES A Secondary Distribution TRAILERS, SMALL A - A - - - - Secondary Distribution AF TRAILERS, LARGE - - - Secondary Distribution PMA Other Govt Costs A - - - - - - Secondary Distribution AF LI 827000 - Mission Support Vehicles Air Force UNCLASSIFIED Page 7 of 20 P-1 Line #12 Volume 1 - 37 === page 74 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 827000 / Mission Support Vehicles Appropriation / Budget Activity / Budget Sub Activity: 3080F / 02 / 7 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Subtotal: Cargo & Utility Vehicles 822990 Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: Mission Support Vehicles FY 2026 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ M) - - - - - 0.000 - - 0.000 - - - - - - - - - - 0.179 AF - - - - - AFR - - - - - - - - - - - AF - - - - - AFNG - - - - - AFR - - - - - - - - AF - - - AFNG - - - AFR - - - - 0.000 - - - FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) - ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) 63.885 - - - - 9 1.611 - - - 0.179 - 6 1.074 - - 3 0.537 - 36 9.612 - - - 32 8.544 - - 2 0.534 - - - 2 0.534 - - 40 4.680 - - - 36 - - - 3 - - - - 1 - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - 0.830 - - - - - - - - - - - - AF - - - - - AFNG - - - - - AFR - - - - Total Cost Qty (Each) ($ M) - 63.885 Special Purpose Vehicles - 823990 MB-4 TOW TRACTORS A 9 1.611 - 6 1.074 - 3 0.537 36 9.612 - 32 8.544 - 2 0.534 - - 2 0.534 - - 40 4.680 4.212 - - 36 4.212 0.351 - - 3 0.351 0.117 - - 1 0.117 - - - - - - - - - - - - - 12 9.960 - - - 0.830 12 9.960 12 9.960 - - 12 9.960 20 12.000 - - 20 12.000 - 11 6.600 - - 11 6.600 - 4 2.400 - - 4 2.400 - - 5 3.000 - - 5 3.000 Secondary Distribution MB-2 TOW TRACTORS A - - - 0.267 - 0.267 Secondary Distribution FLIGHT LINE TOW TRACTORS A - - - 0.117 - 0.117 Secondary Distribution Ukraine Support Supplemental A Pacific Resilient Distributed Air Basing A DEICERS EXTENDED REACH A Secondary Distribution AF DEICERS TRUCK MOUNTED A - - - 0.600 - 0.600 Secondary Distribution TRUCK FUEL AVGAS A - - 0.000 - - - - - - - - - - - - - - - TRUCK REFUELERS A - - - - - - - - - 0.405 213 86.265 - - - 0.405 213 86.265 AF - - - - - - 203 82.215 - - 203 82.215 AFNG - - - - - - 7 2.835 - - 7 2.835 AFR - - - - - - 3 1.215 - - 3 1.215 Secondary Distribution LI 827000 - Mission Support Vehicles Air Force UNCLASSIFIED Page 8 of 20 P-1 Line #12 Volume 1 - 38 === page 75 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 827000 / Mission Support Vehicles Appropriation / Budget Activity / Budget Sub Activity: 3080F / 02 / 7 Prior Years MDAP/ Item Number / Title [DODIC] ID CD TRUCK REFUELER LARGE CAPACITY A TOW TRACTORS LARGE A TOW TRACTORS SMALL A TOW TRACTORS U-30 A MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: Mission Support Vehicles FY 2026 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - - - - - - - - 0.385 1 0.385 - - - 0.385 - - - - - - 1 0.385 - - - - - - - - 1 0.550 - - - - - - - - 1 0.550 - - - - - - - - 9 3.438 - - AF - - - - - - 7 2.674 - AFR - - - - - - 2 0.764 - - - 0.000 - - - - - - - - - - - - - - - - - - - - - - - - 0.530 10 5.300 - - - 0.530 10 5.300 AF - - - - - - 8 4.240 - - 8 4.240 AFR - - - - - - 2 1.060 - - 2 1.060 - - - - - - 7 3.640 - - 7 3.640 - - - - - - 7 3.640 - - 7 3.640 - - - - - - 1 0.200 - - 1 0.200 - - - - - - 1 0.200 - - 1 0.200 - - 0.000 - - - - - - - - - - - - - - - - 0.080 1 0.385 1 0.385 1 0.550 1 0.550 9 3.438 - 7 2.674 - 2 0.764 Secondary Distribution AF TRUCK DIGGER DERRICKS A - - - 0.550 - 0.550 Secondary Distribution AFNG TRUCK HIGH REACH A - - - 0.382 - 0.382 Secondary Distribution TRUCK HI-REACH MAINTENANCE PLATFORM A TRUCK LAVATORY SERVICE A Secondary Distribution TRUCK SPECIALIZED LARGE A - - - 0.520 - 0.520 Secondary Distribution AF TRUCK SPECIALIZED SMALL A - - - 0.200 - 0.200 Secondary Distribution AF TRUCK MAINTENANCE LARGE A TRUCK MAINTENANCE SMALL A LI 827000 - Mission Support Vehicles Air Force UNCLASSIFIED Page 9 of 20 - 8 - - - - - 0.640 - - - 0.080 P-1 Line #12 - - 8 0.640 Volume 1 - 39 === page 76 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 827000 / Mission Support Vehicles Appropriation / Budget Activity / Budget Sub Activity: 3080F / 02 / 7 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: Mission Support Vehicles FY 2026 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Secondary Distribution AF - - - - - - 3 0.240 - - 3 0.240 AFNG - - - - - - 5 0.400 - - 5 0.400 - - - - - - 0.335 7 2.345 - - 0.335 7 2.345 - - - - - - 7 2.345 - - 7 2.345 - - - - - - 0.250 15 3.750 - - 0.250 15 3.750 15 3.750 - - 15 3.750 - - - - - - - - 3 0.633 - - - 0.211 3 0.633 - - TRUCK STAIRCASE A - - - - Secondary Distribution AF TRUCK TANK FUELS 1200GAL A - - - - Secondary Distribution AF - - - - - - - - 0.000 - - - - - - - - - - - - - - - - 0.211 - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - - - - - - - - - - 0.020 - - - - - 0.020 - - - - - - - 0.020 - - - 0.020 - - 0.000 - - - - - - - - - - - - - - - - - - - - - - - - - - 145.029 - - - - - A - - - - - - - - - 0.045 3 0.135 - - - 0.045 - - - - 3 0.135 - - A - - - - - - - TRUCK TANK FUELS 250GAL A TRUCK WRECKERS A 3 0.633 3 0.633 Secondary Distribution AF TRAILER CABLE REEL LARGE A TRAILER CABLE REEL SMALL A TRAILER COMPRESSED GAS A TRAILER FUEL SERVICING A VC-25B (PE 0401319F) A FLTT 4X4 A PMA Other Govt Costs A Secondary Distribution AF PMA Contractor Services A Subtotal: Special Purpose Vehicles 823990 145.029 Security & Tactical Vehicles - 823230 CARGO TRAILER 3 0.135 3 0.135 Secondary Distribution AFNG CARR CGO SNOW LI 827000 - Mission Support Vehicles Air Force - - - 0.000 - - UNCLASSIFIED Page 10 of 20 - - - P-1 Line #12 - - - - Volume 1 - 40 === page 77 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 827000 / Mission Support Vehicles Appropriation / Budget Activity / Budget Sub Activity: 3080F / 02 / 7 Prior Years MDAP/ Item Number / Title [DODIC] ID CD HIGH MOBILITY TRAILER, LIGHT M1101 A HMMWV TRAILERS A GUARDIAN ANGEL AIR-DEPLOYABLE RESCUE VEHICLE (GAARV) A PMA OTHER GOVERNMENT COSTS A PMA CONTRACTOR SERVICES A MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: Mission Support Vehicles FY 2026 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - - - - - - - - - - 0.135 - - - - - 0.135 - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - - - - - - - - 0.341 13 4.433 - - - 0.341 13 4.433 AF - - - - - - 11 3.751 - - 11 3.751 AFNG - - - - - - 2 0.682 - - 2 0.682 - - - - - - 4 0.780 - - 4 0.780 - - - - - - 4 0.780 - - 4 0.780 - - - - - - 7 4.585 - - 7 4.585 AF - - - - - - 5 3.275 - - 5 3.275 AFR - - - - - - 2 1.310 - - 2 1.310 - - - - - - 7 4.032 - - 7 4.032 AF - - - - - - 4 2.304 - - 4 2.304 AFNG - - - - - - 2 1.152 - - 2 1.152 AFR - - - - - - 1 0.576 - - 1 0.576 Subtotal: Security & Tactical Vehicles - 823230 Runway Snow Removal - 826210 Pacific Resilient Distributed Air Basing A Ukraine Support Supplemental A CLEANER, VAC MULTIPURPOSE (2438) A RUNWAY SWEEPERS A Secondary Distribution ROTARY SWEEPERS A - - - 0.195 - 0.195 Secondary Distribution AF SNOW REMOVAL VEHICLES A - - - 0.655 - 0.655 Secondary Distribution SNOW PLOW VEHICLES A - - - 0.576 - 0.576 Secondary Distribution LI 827000 - Mission Support Vehicles Air Force UNCLASSIFIED Page 11 of 20 P-1 Line #12 Volume 1 - 41 === page 78 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 827000 / Mission Support Vehicles Appropriation / Budget Activity / Budget Sub Activity: 3080F / 02 / 7 Prior Years MDAP/ Item Number / Title [DODIC] ID CD SNOW BROOM & BLOWER VEHICLES A MAIS Code Unit Cost ($ M) Qty (Each) - - FY 2025 Total Cost Unit Cost ($ M) ($ M) - - Qty (Each) Aggregated Items Title: Mission Support Vehicles FY 2026 Total Cost Unit Cost ($ M) ($ M) - - - Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ M) - - FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) 0.735 ($ M) 4 2.940 4 2.940 - Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) - - Total Cost Qty (Each) ($ M) 0.735 4 2.940 4 2.940 Secondary Distribution AF - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - - - - - - - - - - 16.770 - - - - - 16.770 A - - - - - - - - - 0.023 8 0.184 - - - 0.023 - - - - - - - - A - - - - - - - - - - - - - - - - - A - - - - - - - - - - - - - - - - - A - - - - - - - - - 45K REVERSIBLE PLOW (1944) A PMA OTHER GOVERMENT COSTS A Subtotal: Runway Snow Removal 826210 Civil Air Patrol - 822910 SEDAN 8 0.184 Secondary Distribution AF SUV - - 8 0.184 0.040 1 0.040 1 0.040 0.045 19 0.855 19 0.855 3 0.150 3 0.150 - 8 0.184 0.040 1 0.040 1 0.040 0.045 19 0.855 19 0.855 3 0.150 3 0.150 Secondary Distribution AF 12 PAX VAN - - - Secondary Distribution AF PICK-UP - - 0.050 - 0.050 Secondary Distribution AF - - - - - - - - - - - - - - - - - - - - - - - - - 0.283 - - - - - - - - - - - - - - - - - - - - - - - - AF - - - - - AFNG - - - - - - 0.000 - - - - Subtotal: Civil Air Patrol - 822910 - - 1.229 - - - - 4 1.132 - - - 0.283 - - - - - - - - - - 1.229 Base Maintenance Support - 826990 Back Hoe, Air Transportable A 4 1.132 Secondary Distribution AF Compact Track Loader A - - - 4 1.132 0.150 8 1.200 8 1.200 0.248 15 3.720 - 13 3.224 - - 2 0.496 - - - 4 1.132 0.150 8 1.200 8 1.200 0.248 15 3.720 - 13 3.224 - 2 0.496 Secondary Distribution AF FARM TRACTOR A - - - - Secondary Distribution Ukraine Effort A - LI 827000 - Mission Support Vehicles Air Force - - UNCLASSIFIED Page 12 of 20 - - - P-1 Line #12 - - - - Volume 1 - 42 === page 79 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 827000 / Mission Support Vehicles Appropriation / Budget Activity / Budget Sub Activity: 3080F / 02 / 7 Prior Years MDAP/ Item Number / Title [DODIC] ID CD ASPHALT / CONCRETE VEHICLES A MAIS Code Unit Cost ($ M) Qty (Each) - FY 2025 Total Cost Unit Cost ($ M) ($ M) - - - - - - - - - - - Qty (Each) Aggregated Items Title: Mission Support Vehicles FY 2026 Total Cost Unit Cost ($ M) ($ M) - - - - - - - - - - - Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ M) - - - - - - - - - - FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) 0.275 ($ M) 1 0.275 1 0.275 1 0.487 1 0.487 0.947 17 16.099 - Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) - - - - - - - - - - Total Cost Qty (Each) ($ M) 0.275 1 0.275 1 0.275 1 0.487 1 0.487 0.947 17 16.099 Secondary Distribution AFNG Pacific Resilient Distributed Air Basing A - - - 0.487 - 0.487 Secondary Distribution AF ARMORED LOADERS A - - - - Secondary Distribution AF - - - - - - 17 16.099 - - 17 16.099 - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - - - - - - - - 0.340 2 0.680 - - - 0.340 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - AF - - - - - AFNG - - - - - ARMORED DOZERS A ASPHALT BATCH PLANTS A ASPHALT RECYCLERS A 2 0.680 Secondary Distribution AF CONCRETE MIXERS A - A - - - 2 0.680 0.209 2 0.418 2 0.418 0.585 18 10.530 - 12 7.020 - - 6 3.510 - - 2 0.680 0.209 2 0.418 2 0.418 0.585 18 10.530 - 12 7.020 - 6 3.510 Secondary Distribution AF CRANES, LARGE - - - Secondary Distribution CRANES, SMALL A - - 0.000 - - - - - - - - - - - - - - - CRAWLERS A - - 0.000 - - - - - - - - - - - - - - - CRUSHING / SCREENING PLANTS A - - - - - - - - - 0.089 2 0.178 - - - 0.089 - - - - - - 2 0.178 - - - - - - - - 2 0.432 - - - - - - - - 2 0.432 - - - - - - - - 4 0.416 - - 2 0.178 2 0.178 2 0.432 2 0.432 4 0.416 Secondary Distribution AF DISTR WATER TRUCKS A - - - 0.216 - 0.216 Secondary Distribution AF DISTR WATER TRAILERS A - LI 827000 - Mission Support Vehicles Air Force - - UNCLASSIFIED Page 13 of 20 0.104 P-1 Line #12 - 0.104 Volume 1 - 43 === page 80 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 827000 / Mission Support Vehicles Appropriation / Budget Activity / Budget Sub Activity: 3080F / 02 / 7 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: Mission Support Vehicles FY 2026 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Secondary Distribution AF - - - - - - - - AF - AFNG - - - - - - - - - - - - - - - - - AF - AFR - - - - - - - - - AF - AFNG - - - - - AFR - - - - AF - AFNG - - AF - AFNG - - AF - AFNG - - - - DITCHING MACHINES A - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 4 0.416 4 0.400 - 3 - 1 5 3.830 5 3.830 2 0.220 - 1 - 1 22 4.730 - 20 - 1 - - - - - - - - - - - - - - - - - - - - - - - - - - 0.300 - 0.100 - - - - - - 0.110 - 0.110 - - 4.300 - 0.215 - 1 0.215 21 7.035 - 18 - 3 7 3.500 - 6 - 1 30 6.300 - 16 - 14 24 5.688 24 5.688 0.100 4 0.416 4 0.400 - 3 0.300 - 1 0.100 5 3.830 5 3.830 2 0.220 - 1 0.110 - 1 0.110 22 4.730 - 20 4.300 - 1 0.215 - - 1 0.215 - - 21 7.035 6.030 - - 18 6.030 1.005 - - 3 1.005 - - 7 3.500 3.000 - - 6 3.000 0.500 - - 1 0.500 - - 30 6.300 3.360 - - 16 3.360 2.940 - - 14 2.940 - - 24 5.688 - - 24 5.688 - 0.100 Secondary Distribution DOZERS A - - - 0.766 - 0.766 Secondary Distribution AF DUMP TRUCKS, SMALL A - - - 0.110 - 0.110 Secondary Distribution DUMP TRUCKS, LARGE A - - - 0.215 - 0.215 Secondary Distribution EXCAVATORS A - - - 0.335 - 0.335 Secondary Distribution GRADERS A - - - 0.500 - 0.500 Secondary Distribution LOADERS LESS THAN 2 CY A - - - 0.210 - 0.210 Secondary Distribution LOADERS GREATER THAN 2 CY A - - - 0.237 - 0.237 Secondary Distribution AF LI 827000 - Mission Support Vehicles Air Force UNCLASSIFIED Page 14 of 20 P-1 Line #12 Volume 1 - 44 === page 81 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 827000 / Mission Support Vehicles Appropriation / Budget Activity / Budget Sub Activity: 3080F / 02 / 7 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MIXERS BITUMINOUS A PAVING MACHINES A ROLLERS MOTORIZED A MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: Mission Support Vehicles FY 2026 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ M) - - 0.000 - - - - - - - - 0.000 - - - - - - - - - - - - - AF - - - - - AFNG - - - - - - - - - - - FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) - - - - - 0.235 ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) - - - - - - - - 11 2.585 - - - 7 1.645 - - 4 0.940 - 3 0.210 - - 3 0.210 Total Cost Qty (Each) ($ M) - - - - - - - - 0.235 11 2.585 - 7 1.645 - 4 0.940 3 0.210 3 0.210 Secondary Distribution ROLLERS VIBRATING A - - - 0.070 - 0.070 Secondary Distribution AF SCRAPERS A SEWER & MANHOLE VEHICLES A TRACTOR WHEELED INDUSTRIAL A TRAILERS DITCH TILT A TRUCK SEWER CENTRIFUGAL A - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - - - - - - - - 0.584 17 9.928 - - - 0.584 17 9.928 - - - - - - 17 9.928 - - 17 9.928 - - - - - - 4 0.828 - - 4 0.828 - - - - - - 4 0.828 - - 4 0.828 - - - - - - - - Secondary Distribution AF TRUCK WATER WASTE A - - - 0.207 - 0.207 Secondary Distribution AFNG PMA Other Govt Costs A - - - - - 0.012 - - - 0.012 Secondary Distribution AF - - - - - - - 0.012 - - - 0.012 - - - - - - - - - - - 80.833 - - - - - 80.833 - - - - - - - - - 0.080 43 3.440 - - - 0.080 43 3.440 AF - - - - - - 28 2.240 - - 28 2.240 AFNG - - - - - - 15 1.200 - - 15 1.200 - - - - - - 1 0.228 - - 1 0.228 Subtotal: Base Maintenance Support - 826990 Material Handling Equipment - 825990 F/L 4-6K A Secondary Distribution F/L 20K TO 25K A - - - 0.228 - 0.228 Secondary Distribution LI 827000 - Mission Support Vehicles Air Force UNCLASSIFIED Page 15 of 20 P-1 Line #12 Volume 1 - 45 === page 82 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 827000 / Mission Support Vehicles Appropriation / Budget Activity / Budget Sub Activity: 3080F / 02 / 7 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) AF FY 2025 Total Cost Unit Cost ($ M) ($ M) - - - - AF - AFNG - - 0.000 - - - Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($ M) - - - - - - - - - - 0.000 - - - 0.000 - - - - - - - - AF - AFNG - - 0.000 - - - AF - AFR - - - - - - - - - - - - - - F/L 10K NUKE A - Aggregated Items Title: Mission Support Vehicles Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1.525 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.125 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1 0.228 44 13.200 - 39 - 5 Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) - - - - 11.700 - 1.500 - - - - - - - - - - - - - - - - - - - - - 21 32.025 - - - 1.525 21 32.025 21 32.025 - - 21 32.025 2 0.114 - - 2 0.114 - 1 0.057 - - 1 0.057 - 1 0.057 - - 1 0.057 0.300 - 1 0.228 44 13.200 - 39 11.700 - 5 1.500 0.300 Secondary Distribution TRK CNTR LIFT SIDELODR A Pacific Resilient Distributed Air Basing A Ukraine Support Supplemental A Halvorsen 25K Loader A Secondary Distribution AF FORKLIFTS, 2-6K ELECTRIC A - - - 0.057 - 0.057 Secondary Distribution FORKLIFTS, 4-6K DIESEL A FORKLIFTS, 4-6K COMMERCIAL A - - - - - - 8 1.000 - - - 0.125 - 7 0.875 - - 1 0.125 - 14 2.674 - - - - - - - - - - - - - - - 8 1.000 - 7 0.875 - 1 0.125 14 2.674 Secondary Distribution FORKLIFTS, 10-15K DIESEL A - - - 0.191 - 0.191 Secondary Distribution AF FORKLIFTS, 10-13K ALL TERRAIN A - - - 0.228 14 2.674 50 11.400 50 11.400 16 4.192 16 4.192 4 1.644 - 0.228 14 2.674 50 11.400 50 11.400 16 4.192 16 4.192 4 1.644 Secondary Distribution AF FORKLIFTS, 10K TELEHANDLERS A - - - 0.262 - 0.262 Secondary Distribution AF FORKLIFTS, 20-25K ROUGH TERRAIN A - LI 827000 - Mission Support Vehicles Air Force - - UNCLASSIFIED Page 16 of 20 0.411 P-1 Line #12 - 0.411 Volume 1 - 46 === page 83 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 827000 / Mission Support Vehicles Appropriation / Budget Activity / Budget Sub Activity: 3080F / 02 / 7 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: Mission Support Vehicles FY 2026 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Secondary Distribution AF - - - - - - - - AF - AFNG - - - - - - 0.000 - - - WAREHOUSE TUGS, 2-4K A - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.055 - 4 1.644 4 0.300 4 0.300 7 0.728 - 5 - 2 1 0.398 1 0.398 0.075 - - - - - - - - 0.520 - 0.208 - - - - - - - - - - - - - - - 0.055 - 4 1.644 4 0.300 4 0.300 7 0.728 - 5 0.520 - 2 0.208 1 0.398 1 0.398 0.075 Secondary Distribution AF CONVEYOR BELTS A - - - 0.104 - 0.104 Secondary Distribution CONTAINER HANDLERS A - - - 0.398 - 0.398 Secondary Distribution AF WAREHOUSE CRANES A PMA OTHER GOVERNMENT COSTS A Secondary Distribution AF Subtotal: Material Handling Equipment - 825990 - - - - - - - 0.055 - - - 0.055 - - - - - - - - - - - 71.398 - - - - - 71.398 - - 0.000 - - - - - - - - - - - - - - - - - - - - - - - - 1.081 4 4.324 - - - 1.081 - - - - - - 4 4.324 - - - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - Fire Fighting & Crash Rescue - 824010 Pacific Resilient Distributed Air Basing A FFGT CRASH RESCUE ULTRA HIGH PRESSURE A 4 4.324 4 4.324 Secondary Distribution AF FFGT CRASH RESCUE HIGH REACH EXTENDABLE TURRET A FFGT QUINT A FFGT RAPID INTERVENTION VEHICLE A FFGT HAZARDOUS MATERIAL A LI 827000 - Mission Support Vehicles Air Force UNCLASSIFIED Page 17 of 20 P-1 Line #12 Volume 1 - 47 === page 84 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 827000 / Mission Support Vehicles Appropriation / Budget Activity / Budget Sub Activity: 3080F / 02 / 7 Prior Years MDAP/ Item Number / Title [DODIC] ID CD FFGT HIGH REACH (AERIALS) A FFGT MEDIUM RESCUE A MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: Mission Support Vehicles FY 2026 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ M) - - 0.000 - - - - - - - - - - - - - - - - 0.592 - - - - - - - - - - - - - - - - - - - - - - - - FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) - ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) - - - - - 2 1.184 - - - 0.592 2 1.184 - - 6 6.396 - - 6 6.396 - - 0.759 10 7.590 - - Total Cost Qty (Each) ($ M) - 2 1.184 2 1.184 6 6.396 6 6.396 0.759 10 7.590 10 7.590 Secondary Distribution AF FFGT PUMPERS A - - - 1.066 - 1.066 Secondary Distribution AF FFGT WATER TANKERS A - - - - Secondary Distribution - - - - - - 10 7.590 - - FFGT WILDLAND AF A - - 0.000 - - - - - - - - - - - - - - - ARFF A - - - - - - - - - 1.500 13 19.500 - - - 1.500 13 19.500 - - - - - - 13 19.500 - - 13 19.500 - - - - - - - 0.003 - - - 0.003 - - - - - - - 0.003 - - - 0.003 - - - - - - - - - - - 38.997 - - - - - 38.997 - - - - - - - - - 0.405 15 6.075 - - - 0.405 15 6.075 AF - - - - - - 11 4.455 - - 11 4.455 AFNG - - - - - - 4 1.620 - - 4 1.620 - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - - - - - - - - 0.075 2 0.150 - - - 0.075 - - - - - - 2 0.150 - - - - - - - - 1 0.275 - - - - - - - - 1 0.275 - - Secondary Distribution AF PMA OTHER GOVERNMENT COSTS A - - - - - - Secondary Distribution AF Subtotal: Fire Fighting & Crash Rescue - 824010 Medium Tactical Vehicles - 822230 M SERIES TRUCKS A Secondary Distribution M SERIES TRACTORS A M SERIES DUMP TRUCKS A M SERIES TRAILERS A 2 0.150 2 0.150 1 0.275 1 0.275 Secondary Distribution AF M SERIES WRECKERS A - - - 0.275 - 0.275 Secondary Distribution AFNG LI 827000 - Mission Support Vehicles Air Force UNCLASSIFIED Page 18 of 20 P-1 Line #12 Volume 1 - 48 === page 85 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 827000 / Mission Support Vehicles Appropriation / Budget Activity / Budget Sub Activity: 3080F / 02 / 7 Prior Years MDAP/ Item Number / Title [DODIC] ID CD M SERIES WATER TRAILERS A MAIS Code Unit Cost ($ M) Qty (Each) - FY 2025 Total Cost Unit Cost ($ M) ($ M) - - AF - AFNG - - - - - - AF - AFNG - - - - - - 0.000 - - - - Qty (Each) Aggregated Items Title: Mission Support Vehicles FY 2026 Total Cost Unit Cost ($ M) ($ M) - - - - - - - - - - - - - - - - - - - - - - - - - 0.000 - - - - - Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ M) - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.051 FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) 55 2.805 - 54 - 1 3 0.264 3 0.264 7 0.756 - 6 - 1 - Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) - - 2.754 - 0.051 - - - - - - 0.648 - 0.108 - - - - 0.051 Total Cost Qty (Each) ($ M) 55 2.805 - 54 2.754 - 1 0.051 3 0.264 3 0.264 7 0.756 - 6 0.648 - 1 0.108 Secondary Distribution M SERIES ISO CONTAINER TRAILERS A - - - 0.088 - 0.088 Secondary Distribution AF DOLLYSETS A - - - 0.108 - 0.108 Secondary Distribution PMA OTHER GOVERNMENT COST A - - - - - 0.009 - - 0.009 - - - - - - - - - 10.334 - - - - - - - - - - 0.135 1 0.135 - 1 0.135 - - 0.009 - 0.009 - - - - - - 10.334 - - - - - - - 0.135 Secondary Distribution AF PMA CONTRACTOR SUPPORT A Subtotal: Medium Tactical Vehicles 822230 Passenger Carrying Vehicles - 821800 UKRAINE SUPPORT SUPPLEMENTAL A TRANSIT BUS A - - - - - - - - - 23 PAX BUS 3919 A - - 0.000 - - - - - - - - - - - - - - - PMA OTHER GOVT COSTS A - - - - - - - - - - - 0.030 - - - - - 0.030 - - - - - - - 0.030 - - - 0.030 - - - - - - 16 0.592 - - 16 0.592 - - - - - - 16 0.592 - - 16 0.592 - - - - - - 1 0.845 - - 1 0.845 1 0.135 1 0.135 Secondary Distribution AF Secondary Distribution AF SEDANS A - - - 0.037 - 0.037 Secondary Distribution AF INTRA-CITY MOTORCOACH A - - - 0.845 - 0.845 Secondary Distribution LI 827000 - Mission Support Vehicles Air Force UNCLASSIFIED Page 19 of 20 P-1 Line #12 Volume 1 - 49 === page 86 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 827000 / Mission Support Vehicles Appropriation / Budget Activity / Budget Sub Activity: 3080F / 02 / 7 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) AF FY 2025 Total Cost Unit Cost ($ M) ($ M) - - - - AF - AFNG - - WORK BUSES A - Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($ M) - - - - - - - - - - Aggregated Items Title: Mission Support Vehicles Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ M) - - - - - - - - - - FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) 1 0.845 40 8.360 - 39 - 1 4 0.188 4 0.188 0.209 Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) - - - - 8.151 - 0.209 - - - Total Cost Qty (Each) ($ M) 1 0.845 40 8.360 - 39 8.151 - 1 0.209 4 0.188 4 0.188 0.209 Secondary Distribution LAW ENFORCEMENT SEDANS A - - - 0.047 - 0.047 Secondary Distribution - - - - - - - - ARMORED SEDANS AF A - - 0.000 - - - - - - - - - - - - - - - BUSES - SMALL A - - 0.000 - - - - - - - - - - - - - - - BUSES - LARGE A - - 0.000 - - - - - - - - - - - - - - AMBULANCES A - - - - - - - - - 0.283 1.132 - - - 0.283 - - - - - - - - Subtotal: Passenger Carrying Vehicles - 821800 - - - - - - - - - - - 11.282 - - - - - 11.282 Total - - - - - 0.000 - - 0.000 - - 439.892 - - - - - 439.892 4 4 1.132 Secondary Distribution AF Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. LI 827000 - Mission Support Vehicles Air Force UNCLASSIFIED Page 20 of 20 4 1.132 P-1 Line #12 4 1.132 Volume 1 - 50 === page 87 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 831010 / Comsec Equipment Equip / BSA 1: Comm Security Equipment(Comsec) ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - Procurement Quantity (Units in Each) - - Gross/Weapon System Cost ($ in Millions) - 75.880 Less PY Advance Procurement ($ in Millions) - - Net Procurement (P-1) ($ in Millions) - 75.880 Plus CY Advance Procurement ($ in Millions) - - Total Obligation Authority ($ in Millions) - 75.880 123.850 123.850 123.850 374.613 - - 374.613 - - 374.613 - 374.613 374.613 374.613 556.936 556.936 556.936 558.642 558.642 558.642 329.385 329.385 329.385 To FY 2031 Complete 335.969 335.969 335.969 Total - 2,355.275 - 2,355.275 - 2,355.275 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: These programs support Cyberspace Activities. PE 0303135F PUBLIC KEY INFRASTRUCTURE (PKI) This program centrally funds procurement of PKI Identity Management (IDM) as part of the Department of War (DoW) Identity Credential and Access Management (ICAM) program to support warfighter requirements. Department of the Air Force (DAF) IDM programs align with DoW ICAM efforts and support DoW ICAM Roadmap and Strategic Plan and the DAF ICAM Technology Roadmap. PKI provides the fundamental framework implemented within DoW to ensure information system's security. It provides the capability to attach digital signatures to electronic documents for IDM, to encrypt and decrypt electronic documents for secure transmission, and to support physical and logical access control solutions. PKI-enabled applications afford confidentiality and authentication services to communications and/or network transactions, as well as verification of the data integrity and non-repudiation of those transactions. PKI is one of many security solutions used to protect information and provide attributes enabling authorization access to critical resources in the Air Force Information Networks (AFIN) and used concurrently with other solutions. PE also includes Air Force Identity (AFID) services, which is the single source of consolidated authoritative IDM enabling secure smart card logon to DAF clients and applications supporting both Air Force and Space Force. AFID ensures that DAF user identities are common and synchronized across directories and information stores of various networks, systems, and applications. AFID eliminates the disparity of maintaining stove-piped systems and, using directory technology, alleviates latency associated with the sharing/replication of identity data attributes. AFID supports delivery of an enterprise security service and backbone for DAF networks, by providing DAF user credentials to the DAF Network Enterprise and DAF system applications. Requirements essential for the operations of the Program Management Office (PMO) include but are not limited to program support requirements for management, oversight, and basic operations. PE 0303140F INFORMATION SYSTEMS SECURITY PROGRAM (ISSP) This program centrally funds procurement of Communications Security (COMSEC) equipment, ancillary encryption/decryption devices, and related equipment used to ensure confidentiality, integrity, and availability and to enable the secure transport of information. ISSP delivers on rising national, DoW, and DAF (includes Space Force ground networks) priorities to address cybersecurity threats and increasing warfighter dependence on cyberspace. DAF and DoW require the capability to collect, process, and disseminate an uninterrupted flow of information while denying an adversary the ability to intercept, collect, destroy, interpret, or manipulate our information flows. Secure communication allows the DoW to achieve and maintain decision superiority, the key to successful application of the military instrument of national power in modern, high-tempo, full spectrum operations. DAF COMSEC equipment protects information such as, warfighter positions, mission planning, target strikes, commander's orders, intelligence, force LI 831010 - Comsec Equipment Air Force UNCLASSIFIED Page 1 of 13 P-1 Line #14 Volume 1 - 51 === page 88 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 831010 / Comsec Equipment Equip / BSA 1: Comm Security Equipment(Comsec) ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A strength, and force readiness. When an adversary is capable of interpretation, manipulation, or destruction of the information used by the warfighter, Department of War (DoW) military forces may suffer devastating mission degradation that can result in loss of life and resources and/or exceptionally grave damage to national security. The Communications Security (COMSEC) program includes equipment upgrades and replacements which incorporate the best technologies mandated to provide mission critical warfighter secure voice and data communications in tactical, strategic, and network applications for our globally deployed COMSEC crypto assets supporting Department of the Air Force (DAF) (including Space Force ground networks), and DoW missions. Details of the assets are included in each section's narrative. Funding for this exhibit contained in PE 0303135F; PE 0303140F. LI 831010 - Comsec Equipment Air Force UNCLASSIFIED Page 2 of 13 P-1 Line #14 Volume 1 - 52 === page 89 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 831010 / Comsec Equipment Equip / BSA 1: Comm Security Equipment(Comsec) ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Public Key Infrastructure (PKI) P-5 Information Systems Security Program P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) A - / - - / 4.796 / 5.715 - / - A - / - - / 71.084 - - / 118.962 / 4.888 - - / 368.898 - / - - - / 368.898 / 5.715 - / - - / 75.880 - / 123.850 - / 374.613 - / - - / 374.613 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: PE 0303135F PUBLIC KEY INFRASTRUCTURE (PKI) 1. EVOLUTIONARY PKI END USER EQUIPMENT: PKI provides identity management (IDM) services as part of the Department of War (DoW) Identity Credential and Access Management (ICAM) program to support warfighter requirements. Department of the Air Force (DAF) IDM programs align with DoW ICAM efforts and support DoW ICAM Roadmap and Strategic Plan and the DAF ICAM Technology Roadmap. PKI provides the fundamental framework and services implemented within DoW to ensure information systems security. It provides the capability to attach digital signatures to electronic documents for IDM, to encrypt and decrypt electronic documents for secure transmission, and to support physical and logical access control solutions. PKI-enabled applications afford confidentiality and authentication services to communications and/or network transactions, as well as verification of the data integrity and non-repudiation of those transactions. PKI is one of many security solutions used to protect information and provide attributes enabling authorization access to critical resources in the Air Force Information Networks (AFIN) and is used concurrently with other solutions. Funding supports several different requirement areas to procure infrastructure equipment for the field in support of AFIN, PKI, Evolutionary PKI End User Equipment to include multifactor authentication technologies and authorization services, Less Than Medium Assurance (LTMA) capabilities and services, cloud/ mobile support, claims-based authorization, attribute-based access control, federation to support mission partners, and non-person entities management. The current DoW PKI token (DoW Common Access Card (CAC)) is undergoing a gradual evolution towards a higher assurance token. Additionally, Homeland Security Presidential Directive-12 (HSPD-12) mandates a common identification card across the Federal Government. Based on the HSPD-12 requirements, the National Institute of Standards and Technology (NIST) developed Federal Information Processing Standard 201 (FIPS 201) which adds security requirements to the identification card. Requirements essential for the operations of the Program Management Office (PMO) include but are not limited to program support requirements for management, oversight, and basic operations. 2. AIR FORCE IDENTITY SERVICES (AFID): AFID is the Department of the Air Force (DAF) enterprise-level directory service and attribute store which provides the single source of consolidated authoritative identity management data that enables secure smart card logon to both Air Force and Space Force clients and applications, facilitating global net-centric operations. As part of the DoW/DAF Identity Solutions Branch and integral part of Identity Credential Access Management (ICAM), AFID capabilities include identity data directory (IDD), automated Air Force Network (AFNET) account provisioning, exchange contact information synchronization (ECIS) also known as Global Access List (GAL) synchronization and Dynamic Distribution List Creation and Management and reduces the redundancy of directory services and disparate databases and security stores currently deployed across the DAF. AFID ensures that DAF user identities are common and synchronized across directories and information stores of various networks, systems, and applications. AFID eliminates the inefficiencies of maintaining stove-piped systems and using directory technology, and alleviates latency associated with the sharing/replication of identity data attributes. AFID supports delivery of an enterprise security service and backbone for DAF networks (both in-garrison and tactical), by providing DAF user credentials to the DAF Network Enterprise and DAF system applications. AFID leverages and provides a core meta-directory service that "joins" and synchronizes personal identity data attributes from authoritative DAF and DoW repositories for use by all DAF systems and applications. Funds will support procurement of identity and credential solutions for mobile platforms and DAF systems and applications to meet DoW and DAF ICAM requirements as well as procure hardware, software and contractor supported upgrades. Funds will procure hardware, software, and support upgrades. Requirements essential for the operations of the Program Management Office (PMO) include but are not limited to program support requirements for management, oversight, and basic operations. PE 0303140F INFORMATION SYSTEMS SECURITY PROGRAM LI 831010 - Comsec Equipment Air Force UNCLASSIFIED Page 3 of 13 P-1 Line #14 Volume 1 - 53 === page 90 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 831010 / Comsec Equipment Equip / BSA 1: Comm Security Equipment(Comsec) ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A 1. AIR AND GROUND (A&G) COMMUNICATIONS SECURITY (COMSEC) PROGRAM: The A&G COMSEC Program procures and supports a wide range of secure encryption products supporting Department of the Air Force (DAF) (including Space Force ground networks), inter-service, and various Department of War (DoW) agency customers; and includes items approved under the National Security Agency (NSA) Commercial COMSEC Evaluation Program (CCEP) such as KIV-7M, Tactical Fast Lane (TACLANE), and other High Assurance Internet Protocol Encryptor (HAIPE) devices. The program includes equipment upgrades and replacements that incorporate state-of-the-art technologies for mission-critical warfighter secure voice and data communications. The program continues to support tactical, strategic, and network applications for globally deployed cryptologic assets supporting DAF (includes Space Force ground networks) and DoW. Funding is also needed to perform required repairs and meet contractual commitments to sustain the more than 3000 National Stock Numbers and systems and keep pace with the warfighter's requirements. Supported systems fall within DAF Information Systems Security and Information Assurance arenas. The program provides needed upgrades to encryption devices in FY 2027 to comply with NSA's Advanced Cryptographic Capabilities (ACC) directives. a. IN-LINE NETWORK ENCRYPTORS (INE): Previously called Network Encryption Systems. INEs are the mainstay for securing communications used in classified terrestrial and airborne communications networks. The new INEs feature robust data encryption improvements included in the HAIPE Interoperability Specification (HAIPE IS) as well as Internet Protocol (IP) Version 6 capability that will improve security and expand the bandwidth of DAF secure IP networks (includes unclassified, secret, and top secret). The FY 2027 funding of INEs ramps up a threat-driven overhaul of the entire DAF inventory (over 60,000 devices) and is required to maintain confidentiality, data integrity, and non-repudiation of classified communications. Funding increase of $226.2M supports equipment that addresses security vulnerabilities and advances in quantum computing by adversaries that enable decryption of years of collected classified data, installation of malware, unfettered access to information, and loss of U.S. information dominance. b. AIR AND GROUND COMSEC CONSOLIDATED: The Air and Ground COMSEC line is an aggregation of numerous items: Secure Telephones, COMSEC Acquisition Reform (CAR), Peculiar Support Equipment, Secure Communications Voice/Data, Embedded Encryption Devices, Telemetry Encryption Devices and Air Force Key Management Infrastructure (KMI) Tier 1 and Tier 3 hardware (to include transitioning from Electronic Key Management System Tier 1 to KMI). Each year the types and quantities of items utilized to meet requirements vary; an average unit cost is based on number/type of units planned for purchase. FY 2027 funds procure secure voice/data equipment, latest generation Tier 3 devices (such as key loaders), testing and support equipment, embedded COMSEC modules, and telemetry devices and Link-16. 2. CRYPTOGRAPHIC MODERNIZATION 2 (CM2): The DoW is transforming its existing operational capabilities to realize a seamless, Joint network of information and engagement grids that securely link sensors, command and control cells, and tactical units to support current and future warfighting capabilities. This includes cryptographic devices that are more robust, modular, scalable, capable, net-centric, and durable--allowing more effective and efficient performance including reduced inventory, expanded data rates, simplified upgrades, reduced costs, and ensured Global Information Grid (GIG) compatibility. The GIG requires a transformed cryptographic inventory. The DoW CM2 Initiative delivers that inventory, ensuring a strong security posture for national security and tactical communications systems by providing transparent cryptographic capabilities consistent with National Security Agency (NSA) mandates, and mission environments. The future inventory will provide security devices that ease logistics, support Joint and coalition interoperability, enable network-centric and transparent key/equipment management, and allow effective future upgrades. These CM2 programs enable information dominance by developing and procuring communications security devices that deter and deny known and emerging threats, while accommodating significantly increased bandwidths and processing speeds, without increasing communication transient and information holding risk. Current CM2 programs will ensure modernized, secure communications capability to Vinson/Advanced Narrowband Digital Voice Terminal (ANDVT) devices. Current programs will replace/upgrade over 49,000 devices out of the Air Force's more than 300,000 crypto devices and provided over 100,000 new devices where none were previously available. Other programs, such as Identification Friend or Foe (IFF), and Classified Data At Rest (CDAR), are undergoing development under the auspices of other lines in this PE in order to meet emerging COMSEC requirements for KMI compatibility, as well as various enterprise-wide technological upgrades mandated under the NSA assessments and Policy #3-9 "Cryptographic Modernization Initiative Requirements for Type 1 Cryptographic Products." a. IDENTIFICATION FRIEND OR FOE (IFF) MODE 5 CM: This program developed and in FY 2027 is procuring devices to encrypt and decrypt IFF Mode 5 interrogator and transponder operations. These devices, built to Air Traffic Control Radar Beacon System (ATCRBS), IFF, Mark XIIA, System (AIMS) 04-900 Cryptographic Interface Standard, are integrated into all airborne platforms and ground radar applications to provide critical, immediate tactical aircraft identification data to ground and airborne systems. Modernization of the IFF Mode 5 KIV-78A devices will enable the warfighter to engage and accurately identify friendly or enemy forces as friend or foe. It will prevent fratricide during target engagements and provide authentication and encryption/decryption services. The modernized devices will be quantum resilient and prevent enemy disruption of IFF functions and enhance the needed security for interrogations and response. Procurement of the two primary devices, KIV-78A and KIV-77A are being assessed annually in coordination with HQ ACC/CCC Crypto Requirements Office for any platform requirement changes that drive procurement actions. b. VINSON/ADVANCED NARROWBAND DIGITAL VOICE TERMINAL (ANDVT) CRYPTOGRAPHIC MODERNIZATION (VACM): Full Rate Production of devices to fulfill Department of the Air Force (DAF), Navy, other Department of War (DoW), U.S. Government agency and Foreign Military Sales (FMS) partner orders. Program will execute Engineering Change Proposal (ECP) to correct Deficiency Reports for LI 831010 - Comsec Equipment Air Force UNCLASSIFIED Page 4 of 13 P-1 Line #14 Volume 1 - 54 === page 91 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 831010 / Comsec Equipment Equip / BSA 1: Comm Security Equipment(Comsec) ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A platforms proceeding with integration to ensure adherence to mandates. Additionally, the Program will need to fund production shutdown, culminating the 8-year production effort. Program will execute ECPs for Crypto Modernization 2 (CM2) needed to thwart emerging information assurance vulnerabilities posed by quantum computing. Program will execute the ECP for Tactical Secure Voice Crypto Interoperability Specification (TSVCIS) that ensures North Atlantic Treaty Organization interoperability by incorporating the Secure Tactical Communications - Interoperability Specification. VACM is an element within the AF Cryptographic Modernization Program. This program is developed and is procuring devices designed to replace the legacy capability on VINSON/ANDVT secure voice communications on aircraft, ships, and ground fixed and mobile platforms including critical Nuclear Command, Control, and Communications (NC3) and other Top Secret and Secret networks (Devices: KY-57/58, KY-99/100 and USC-43). The VACM Remote Control Unit (RCU) project is a permanent system modification effort that will augment and replace legacy Z-ANP RCU inventory. RCU is necessary to control VACM End Crypto Units (ECUs) on DoW platforms where the VACM ECU is not easily accessible during operations. FY 2027 funds will be used to procure RCU devices via the RCU production contract. These devices support critical AF VACM users. (1) VACM DEVICES: No Budget Year FY 2027 funding requested. (2) REMOTE CONTROL UNIT (RCU): FY 2027 funding supports production of the modernized Z-ANP RCU, a permanent system modification project that will provide a form fit replacement and backward capability with legacy devices. This effort fixes existing sustainment challenges. c. CLASSIFIED DATA AT REST (CDAR): The CDAR Program includes two National Security Agency (NSA) High Assurance Certified development/procurement efforts, armed with quantum resistant algorithms, quantum resilience and interface agility, to eliminate policy shortfalls and protect classified data at rest on 45 Air Force platforms/systems via one of the first DAF CM2-compliant encryption devices: 1) KSV-270 Single-channel Inline Media Encryptor which is designed to protect data classified up to Top Secret on size, weight and power constrained platforms. 2) KSV-271 Multi-channel Inline Media Encryptor is a larger, more robust device, which is designed to protect data up to Top Secret on large, manned platforms that require more capability than the KSV-270 Single-channel encryptor can process. The CDAR Program Quantum Resilient Inline Media Encryptor (IME) with interface agility provides warfighter platforms a certified enterprise solution to protect Top Secret and Below data at rest data, preventing data vulnerability across platforms. KSV-270 will use FY 2027 - FY 2029 funds to procure 3,300 encryptors for 14 Air Force platforms/systems designated by HAF/A2. d. Nuclear Command and Control (NC2) Crypto: The KG-3XA Program is comprised of two efforts, the embeddable KG-3XA Cryptographic Module (KGV-363), which will support Very Low Frequency (VLF) receivers and transmitters and the KG-3XA Host (KG-333M). KG-3XA provides a form, fit, function modernization of cryptographic capabilities required by Minimum Essential Emergency Communication Networks (MEECN) and Fixed Submarined Broadcast System (FSBS), employed in various airborne and ground equipment for processing of Emergency Action Messages in the nuclear triad, and some tactical applications. e. RRK-NG (Black Arrow): The RRK-NG program is a key distribution/management system providing the transmission of key material to control sites and unmanned remote sites. It is an NSA approved modernized cryptographic solution for use by the North American Aerospace Defense Command (NORAD) Tactical Air Defense mission, the Federal Aviation Administration (FAA) Air Traffic Control Mission, with the capability to be releasable for foreign military sales. Plan to enter Production phase in FY 2028. f. PROGRAM SUPPORT COSTS (PSC): FY 2027 program support administration funding supports management with engineering and technical expertise in support of procurement activities. 3. AIR FORCE (AF) KEY MANAGEMENT INFRASTRUCTURE (KMI): AF KMI Tier 1 and Tier 3 moved to 1. b. AIR AND GROUND COMSEC CONSOLIDATED. a. KMI HARDWARE (Tier 2): FY 2027 funds Tier 2 hardware to include KMI Management Clients (MGCs) that provide the user interface. LI 831010 - Comsec Equipment Air Force UNCLASSIFIED Page 5 of 13 P-1 Line #14 Volume 1 - 55 === page 92 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 831010 / Comsec Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 1 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Public Key Infrastructure (PKI) MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 4.796 4.888 5.715 - 5.715 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 4.796 4.888 5.715 - 5.715 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 4.796 4.888 5.715 - 5.715 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.000 0.000 0.000 - 0.000 Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - 0303135F COMSEC Cost Recurring Cost 1. EVOLUTIONARY PKI END USER EQUIPMENT - - - 0.000 75,529 3.796 0.000 81,115 4.040 0.000 81,655 3.423 - - - 0.000 81,655 3.423 2. AIR FORCE IDENTITY SERVICES (AFID) formerly known as AIR FORCE DIRECTORY SERVICES (AFDS) - - - 0.146 5 0.730 0.135 4 0.538 0.211 7 1.474 - - - 0.211 7 1.474 3. LESS THAN MEDIUM ASSURANCE PKI - - - 0.027 10 0.270 0.028 11 0.310 0.028 29 0.818 - - - 0.028 29 0.818 Subtotal: Recurring Cost - - - - - 4.796 - - 4.888 - - 5.715 - - - - - 5.715 Subtotal: Hardware 0303135F COMSEC Cost - - - - - 4.796 - - 4.888 - - 5.715 - - - - - 5.715 Gross/Weapon System Cost - - - - - 4.796 - - 4.888 - - 5.715 - - - - - 5.715 LI 831010 - Comsec Equipment Air Force UNCLASSIFIED Page 6 of 13 P-1 Line #14 Volume 1 - 56 === page 93 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 831010 / Comsec Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 1 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Information Systems Security Program MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 Procurement Quantity (Units in Each) - - Gross/Weapon System Cost ($ in Millions) - 71.084 Less PY Advance Procurement ($ in Millions) - - Net Procurement (P-1) ($ in Millions) - 71.084 Plus CY Advance Procurement ($ in Millions) - - Total Obligation Authority ($ in Millions) - 71.084 FY 2027 Base FY 2027 OOC - - 118.962 368.898 - 368.898 - 368.898 - - - 118.962 - - - 118.962 FY 2027 Total 368.898 - 368.898 - - 368.898 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Qty Total Cost (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Qty Total Cost (Each) ($ M) Hardware - 1. AIR and GROUND COMSEC (PE 0303140F) Cost Recurring Cost a. IN-LINE NETWORK - - - 0.013 1,948 25.307 0.013 2,978 38.712 0.013 20,911 264.930 - - - 0.013 20,911 264.930 - - - 0.010 3,748 37.480 0.010 4,269 42.686 0.010 4,430 44.627 - - - 0.010 4,430 44.627 Subtotal: Recurring Cost - - - - - 62.787 - - 81.398 - - 309.557 - - - - - 309.557 Subtotal: Hardware - 1. AIR and GROUND COMSEC (PE 0303140F) Cost - - - - - 62.787 - - 81.398 - - 309.557 - - - - - 309.557 (†) ENCRYPTORS b. AIR AND GROUND (†) CONSOLIDATED Hardware - 2. CRYPTOGRAPHIC MODERNIZATION (PE 0303140F) Cost Recurring Cost a. IDENTIFICATION FRIEND OR FOE CM2 KIV-78/77 - - - 0.004 59 0.236 0.004 1,417 5.668 0.004 5,046 20.184 - - - 0.004 5,046 20.184 b. (1) VINSON/ANDVT CRYPTOGRAPHIC MODERNIZATION (VACM) DEVICES - - - 0.011 172 1.892 0.011 9 0.100 - - - - - - - - - b. (2) REMOTE CONTROL UNIT (RCU) - - - 0.018 74 1.332 0.018 168 3.024 0.018 197 3.552 - - - 0.018 197 3.552 c. CLASSIFIED DATA AT REST (CDAR) - - - - - 0.100 0.020 1,048 20.963 0.020 1,382 27.645 - - - 0.020 1,382 27.645 d. NC2 CRYPTO - - - - - - - - - - - 0.000 - - - - - 0.000 LI 831010 - Comsec Equipment Air Force UNCLASSIFIED Page 7 of 13 P-1 Line #14 Volume 1 - 57 === page 94 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 831010 / Comsec Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 1 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Information Systems Security Program MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) e. RRK- NG (BLACK ARROW) - - - - - - - - - - - 0.000 - - - - - 0.000 f. PROGRAM SUPPORT COSTS (PSC) CONTRACTOR SERVICES AND OTHER GOVERNMENT COSTS - - - - - 1.500 - - 4.500 - - 4.500 - - - - - 4.500 Subtotal: Recurring Cost - - - - - 5.060 - - 34.255 - - 55.881 - - - - - 55.881 - - - - - 5.060 - - 34.255 - - 55.881 - - - - - 55.881 Subtotal: Hardware 2. CRYPTOGRAPHIC MODERNIZATION (PE 0303140F) Cost Hardware - 3. AF KMI (PE 0303140F) Cost Recurring Cost a. KMI HARDWARE - - - 0.004 809 3.237 0.004 827 3.309 0.004 865 3.460 - - - 0.004 865 3.460 Subtotal: Recurring Cost - - - - - 3.237 - - 3.309 - - 3.460 - - - - - 3.460 Subtotal: Hardware - 3. AF KMI (PE 0303140F) Cost - - - - - 3.237 - - 3.309 - - 3.460 - - - - - 3.460 Gross/Weapon System Cost - - - - - 71.084 - - 118.962 - - 368.898 - - - - - 368.898 Remarks: COMSEC Equipment is procured as a centrally managed item using 3080. Various units have various price-per-unit values. Average Unit Cost used. 3. Air Force Key Management Infrastructure (AF KMI), a. Key Management Infrastructure (KMI) Hardware here is Tier 2 hardware. The FY27 funding increase allows production of Quantum Resilience modernization to meet NSA-mandated decertification dates for virtually all Air and Ground platforms and networks in DAF with some support for other Services, and multinational and interagency partners. Modernization will secure an uninterrupted flow of national security information while denying adversaries the ability to exploit, interpret, and manipulate that information. Addresses the near peer pacing quantum threat. (†) indicates the presence of a P-5a LI 831010 - Comsec Equipment Air Force UNCLASSIFIED Page 8 of 13 P-1 Line #14 Volume 1 - 58 === page 95 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 1 Cost Elements O O C a. IN-LINE NETWORK ENCRYPTORS (†) a. IN-LINE NETWORK ENCRYPTORS (†) a. IN-LINE NETWORK ENCRYPTORS (†) b. AIR AND GROUND (†) CONSOLIDATED b. AIR AND GROUND (†) CONSOLIDATED b. AIR AND GROUND (†) CONSOLIDATED (†) P-1 Line Item Number / Title: 831010 / Comsec Equipment Item Number / Title [DODIC]: Information Systems Security Program FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery 2025 General Dynamics / Various Various NSA Nov 2024 Jan 2026 1,948 0.013 Y 2026 General Dynamics / Various Various NSA Nov 2025 Jan 2027 2,978 0.013 Y 2027 General Dynamics / Various Various NSA Nov 2026 Jan 2028 20,911 0.013 Y 2025 Raytheon / Florida Various CPSG Mar 2025 Apr 2026 3,748 0.010 Y 2026 BAE Systems / Indiana Various CPSG Mar 2026 Apr 2027 4,269 0.010 Y 2027 BAE Systems / Indiana Various CPSG Mar 2027 Apr 2028 4,430 0.010 Y Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($ M) RFP Issue Date indicates the presence of a P-21 LI 831010 - Comsec Equipment Air Force UNCLASSIFIED Page 9 of 13 P-1 Line #14 Volume 1 - 59 === page 96 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 831010 / Comsec Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Information Systems Security Program Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P a. IN-LINE NETWORK ENCRYPTORS 1 2025 AF 1.948 .000 1.948 1 2026 AF 2.978 .000 2.978 1 2027 AF 20.911 .000 20.911 A - - - - - - - - - - - - - - 1.948 A - - - .000 - - - - - - - - 2.978 20.911 b. AIR AND GROUND CONSOLIDATED 2 2025 AF 3.748 .000 3.748 3 2026 AF 4.269 .000 4.269 3 2027 AF 4.430 .000 4.430 A - - - - - - - - - - - - 3.748 A - - .000 - - - - - 4.269 4.430 O C T LI 831010 - Comsec Equipment Air Force - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #14 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 60 === page 97 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 831010 / Comsec Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Information Systems Security Program Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P a. IN-LINE NETWORK ENCRYPTORS 1 2025 AF 1.948 1.948 .000 1 2026 AF 2.978 .000 2.978 1 2027 AF 20.911 .000 20.911 .000 - - - 2.978 A - - - - - - .000 - - - - - 4.269 A - - - - - - - - - - 11.000 - - - - - - - - 9.911 b. AIR AND GROUND CONSOLIDATED 2 2025 AF 3.748 3.748 .000 3 2026 AF 4.269 .000 4.269 3 2027 AF 4.430 .000 4.430 .000 O C T LI 831010 - Comsec Equipment Air Force N O V D E C J A N F E B M A R A P R .000 M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #14 M A R 4.430 A P R .000 M A Y J U N J U L A U G S E P Volume 1 - 61 === page 98 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 831010 / Comsec Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 1 Cost Elements (Units in Thousands) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Information Systems Security Program Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E a. IN-LINE NETWORK ENCRYPTORS 1 2025 AF 1.948 1.948 .000 1 2026 AF 2.978 2.978 .000 1 2027 AF 20.911 11.000 9.911 .000 .000 - - - 9.911 .000 b. AIR AND GROUND CONSOLIDATED 2 2025 AF 3.748 3.748 .000 .000 3 2026 AF 4.269 4.269 .000 .000 3 2027 AF 4.430 4.430 .000 .000 O C T LI 831010 - Comsec Equipment Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #14 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 62 === page 99 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 831010 / Comsec Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 1 Item Number / Title [DODIC]: Information Systems Security Program Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1,000 1,000 11,000 1 General Dynamics - Various 2 Raytheon - Florida 3 BAE Systems - Indiana 650 650 5,500 ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 0 0 0 0 4,000 2 14 0 0 0 0 0 0 0 16 0 0 0 0 0 4,340 6 13 19 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 831010 - Comsec Equipment Air Force UNCLASSIFIED Page 13 of 13 P-1 Line #14 Volume 1 - 63 === page 100 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 64 === page 101 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 831020 / STRATEGIC MICROELECTRONIC SUPPLY SYSTEM Equip / BSA 1: Comm Security Equipment(Comsec) ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) - Gross/Weapon System Cost ($ in Millions) - Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) - Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) - FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 - 313.667 313.667 313.667 To FY 2031 Complete Total 313.667 313.667 313.667 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Funds procurement of commercial microelectronics items within the FYDP. LI 831020 - STRATEGIC MICROELECTRONIC SUPPLY SYSTEM Air Force UNCLASSIFIED Page 1 of 3 P-1 Line #15 Volume 1 - 65 === page 102 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 831020 / STRATEGIC MICROELECTRONIC SUPPLY SYSTEM Equip / BSA 1: Comm Security Equipment(Comsec) ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 STRATEGIC MICROELECTRONIC SUPPLY SYSTEM P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code A Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 313.667 - / 0.000 - / 0.000 - / - - / 0.000 - / - - / 313.667 - / 0.000 - / 0.000 - / - - / 0.000 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Strategic Microelectronic Supply Items FY25 funding will support procurement of commercial microelectronic items within the Future Year Defense Program (FYDP). Procurement of these items is necessary to ensure assets are available for ongoing Department of War acquisition programs; to avoid breaks in program schedule or production quantities. This line item includes the Life of Type Buys of critical microelectronic components in advance of commercial manufacturing line closures. Detailed information is classified and will be provided on a need-to-know basis. LI 831020 - STRATEGIC MICROELECTRONIC SUPPLY SYSTEM Air Force UNCLASSIFIED Page 2 of 3 P-1 Line #15 Volume 1 - 66 === page 103 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 831020 / STRATEGIC MICROELECTRONIC SUPPLY SYSTEM Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 1 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: STRATEGIC MICROELECTRONIC SUPPLY SYSTEM MDAP/MAIS Code: Resource Summary Prior Years FY 2025 Procurement Quantity (Units in Each) - Gross/Weapon System Cost ($ in Millions) - Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) - Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) - FY 2026 FY 2027 Base FY 2027 OOC - - - - 0.000 0.000 - 0.000 - - - - 0.000 0.000 - 0.000 - - - - 0.000 0.000 - 0.000 313.667 313.667 313.667 FY 2027 Total (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - STRATEGIC MICROELECTRONIC SUPPLY SYSTEM Cost Non Recurring Cost Classified, details provided on need to know basis - - - Subtotal: Non Recurring Cost - - - - Subtotal: Hardware - STRATEGIC MICROELECTRONIC SUPPLY SYSTEM Cost - - - Gross/Weapon System Cost - - - 313.667 1 313.667 - - - - - - - - - - - - - 313.667 - - - - - - - - - - - - - - 313.667 - - - - - - - - - - - - - - 313.667 - - 0.000 - - 0.000 - - - - - 0.000 Remarks: Funds procurement of commercial microelectronic items within the Future Year Defense Program (FYDP). Procurement of these items is necessary to ensure assets are available for ongoing Department of War acquisition programs; to avoid breaks in program schedule or production quantities. This line item includes the Life of Type Buys of critical microelectronic components in advance of commercial manufacturing line closures. Detailed information is classified and will be provided on a need to know basis. LI 831020 - STRATEGIC MICROELECTRONIC SUPPLY SYSTEM Air Force UNCLASSIFIED Page 3 of 3 P-1 Line #15 Volume 1 - 67 === page 104 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 68 === page 105 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 832050 / International Intel Tech & Architectures Equip / BSA 2: Intelligence Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0305600F Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 5.616 5.833 19.060 - 19.060 6.166 6.265 6.383 6.511 - 55.834 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 5.616 5.833 19.060 - 19.060 6.166 6.265 6.383 6.511 - 55.834 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 5.616 5.833 19.060 - 19.060 6.166 6.265 6.383 6.511 - 55.834 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: International Intelligence Technology and Architectures (IITA) oversees, manages, and provides the United States (US) component of the multi-national Battlefield Information Collection and Exploitation Systems (BICES) with a collaborative environment and intelligence sharing enterprise required for processing and dissemination critical intelligence information between and among US, North Atlantic Treaty Organization (NATO), allied and coalition forces. The US BICES program procures communications and electronic equipment, support equipment, accessories, and specialized equipment to deliver a more mature, robust and dynamic suite of capabilities for intelligence information sharing across US BICES, US BICES Extended (US BICES-X), and the Trusted Network Environment (TNE). US BICES-X is a multi-level, secure system that uses releasable elements of the Defense Intelligence Information Enterprise framework, and functions to support the full spectrum of intelligence operations and dissemination across Department of War (DoW), Combat Support Agencies (CSA), and multiple Combatant Commands (CCMD) for the Office of the Under Secretary of War, Intelligence and Security (OUSW(I&S)). The TNE is an Enterprise Cross Domain Solution (ECDS) that connects 65+ network, 85+ partner nations and 69+ Communities of interest (COI) within four operational TNEs. US BICES/US BICES-X has been designated the enduring intelligence and information sharing component to the Mission Partner Environment (MPE). The FY 2027 funding procures hardware and software to support the rationalization, consolidation and modernization of US BICES, US BICES-X and the TNE as a core infrastructure and enterprise for the US BICES Extended Enterprise. In FY27 PROC ($13M) resources will support a classified line item; details can be shared at a higher classification level. Funding for this exhibit contained in PE 0305600F. LI 832050 - International Intel Tech & Architectures Air Force UNCLASSIFIED Page 1 of 8 P-1 Line #16 Volume 1 - 69 === page 106 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 832050 / International Intel Tech & Architectures Equip / BSA 2: Intelligence Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0305600F Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Subexhibits ID CD P-5a, P-21 A Title* P-5 International Intel Tech & Architectures P-40 Total Gross/Weapon System Cost MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 5.616 - / 5.833 - / 19.060 - / - - / 19.060 - / - - / 5.616 - / 5.833 - / 19.060 - / - - / 19.060 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: PE 0305600F IITA - FY2027 funding will procure hardware and software to support operations for Mission Partner Environment (MPE) capabilities focused on sharing information and intelligence, Battlefield Information Collection and Exploitation Systems (BICES), US (BICES), US (BICES-X) and the Trusted Network Environment (TNE). These MPE capabilities share information and intelligence in a secret and below releasable environment. MPE enables secure sharing of operational intelligence and enhances collaboration between the US forces, and trusted allies and other multinational partners. This effort also increases overall combat effectiveness by leveraging capabilities and information from all partners. Procurement may include hardware/software/services required to provide system capability improvements such as, cross-domain solutions, communications infrastructure, network equipment, storage and backup, encryption equipment, and software licenses necessary to modify US BICES-X capabilities, as the core infrastructure and enterprise for the intelligence component of the DoW MPE. In FY27 PROC +$13M resources will also support a classified line item, details shared at a higher classification level. LI 832050 - International Intel Tech & Architectures Air Force UNCLASSIFIED Page 2 of 8 P-1 Line #16 Volume 1 - 70 === page 107 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 832050 / International Intel Tech & Architectures Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: International Intel Tech & Architectures MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 5.616 5.833 19.060 - 19.060 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 5.616 5.833 19.060 - 19.060 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 5.616 5.833 19.060 - 19.060 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - International Intel Tech & Architectures Cost Non Recurring Cost Non-DWCF Investment Electronic and Telecommunication - - - 5.116 - - - - - - - - 1 5.116 5.833 - 5.116 - - 5.116 1 5.833 19.060 - 5.833 - - - 5.833 0.500 - - 1 19.060 - - - 19.060 1 19.060 - 19.060 - - - - - 19.060 - - 19.060 - - - - - 19.060 - - - - - - - - - - (†) equipment Subtotal: Non Recurring Cost Subtotal: Hardware International Intel Tech & Architectures Cost Support - International Intel Tech & Architectures Cost Non-DWCF Investment Electronic and Telecommunication equipment - - - 0.500 Subtotal: Support International Intel Tech & Architectures Cost - - - - - 0.500 - - - - - - - - - - - - Gross/Weapon System Cost - - - - - 5.616 - - 5.833 - - 19.060 - - - - - 19.060 1 Remarks: The FY 2027 $6.06M funding procures hardware and software to support the rationalization, consolidation and modernization of Battlefield Information Collection and Exploitation System (BICES), (US BICES), (US BICES-X) and the Trusted Network Environment (TNE) as a core infrastructure and enterprise for the intelligence component of the DoW MPE. LI 832050 - International Intel Tech & Architectures Air Force UNCLASSIFIED Page 3 of 8 P-1 Line #16 Volume 1 - 71 === page 108 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 P-1 Line Item Number / Title: 832050 / International Intel Tech & Architectures ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: International Intel Tech & Architectures MDAP/MAIS Code: In FY27 $13.0M PROC resources will support a classified line item; details can be shared at a higher classification level. (†) indicates the presence of a P-5a LI 832050 - International Intel Tech & Architectures Air Force UNCLASSIFIED Page 4 of 8 P-1 Line #16 Volume 1 - 72 === page 109 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 Cost Elements Non-DWCF Investment Electronic and Telecommunication (†) equipment Non-DWCF Investment Electronic and Telecommunication (†) equipment Non-DWCF Investment Electronic and Telecommunication equipment (†) O O C P-1 Line Item Number / Title: 832050 / International Intel Tech & Architectures Item Number / Title [DODIC]: International Intel Tech & Architectures FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) 2025 GDIT / Falls Church, VA C / FFP AA-CDM Jul 2026 Aug 2027 1 5.116 Y 2026 GDIT / Falls Church, VA C / FFP AA-CDM Jul 2026 Aug 2028 1 5.833 Y 2027 GDIT / Falls Church, VA C / FFP AA-CDM Jul 2027 Aug 2029 1 19.060 Y Qty (Each) RFP Issue Date indicates the presence of a P-21 Remarks: The FY 2027 6.06M funding procures hardware and software to support the rationalization, consolidation and modernization of Battlefield Information Collection and Exploitation System (BICES), (US BICES), (US BICES-X) and the Trusted Network Environment (TNE) as a core infrastructure and enterprise for the intelligence component of the DoW MPE. In FY27 $13.0M PROC resources will support a classified line item; details can be shared at a higher classification level. LI 832050 - International Intel Tech & Architectures Air Force UNCLASSIFIED Page 5 of 8 P-1 Line #16 Volume 1 - 73 === page 110 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 832050 / International Intel Tech & Architectures Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: International Intel Tech & Architectures Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Non-DWCF Investment Electronic and Telecommunication equipment 1 2025 AF 1 0 1 A - - - - - - - - - - - - - 1 2026 AF 1 0 1 A - - - - - - - - - - - - - O C T N O V D E C LI 832050 - International Intel Tech & Architectures Air Force J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 8 S E P O C T N O V D E C J A N F E B P-1 Line #16 M A R A P R M A Y J U N J U L 1 0 A U G S E P Volume 1 - 74 1 === page 111 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 832050 / International Intel Tech & Architectures Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: International Intel Tech & Architectures Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Non-DWCF Investment Electronic and Telecommunication equipment 1 2025 AF 1 1 0 1 2026 AF 1 0 1 0 O C T N O V D E C LI 832050 - International Intel Tech & Architectures Air Force J A N F E B M A R A P R M A Y J U N J U L 1 A U G UNCLASSIFIED Page 7 of 8 0 S E P O C T N O V D E C J A N F E B P-1 Line #16 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 75 === page 112 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 P-1 Line Item Number / Title: 832050 / International Intel Tech & Architectures Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: International Intel Tech & Architectures Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 1 GDIT - Falls Church, VA MAX For 2027 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 10 25 Total After Oct 1 ALT Prior to Oct 1 35 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 Remarks: The FY 2027 funding procures hardware and software to support the rationalization, consolidation and modernization of Battlefield Information Collection and Exploitation Systems (BICES), (US BICES), (US BICES-X) and the Trusted Network Environment (TNE) as a core infrastructure and enterprise for the intelligence component of the DoW MPE. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 832050 - International Intel Tech & Architectures Air Force UNCLASSIFIED Page 8 of 8 P-1 Line #16 Volume 1 - 76 0 === page 113 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 832060 / Intelligence Training Equipment Equip / BSA 2: Intelligence Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 5.146 5.273 5.531 - 5.531 5.648 5.753 5.862 5.980 - 39.193 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 5.146 5.273 5.531 - 5.531 5.648 5.753 5.862 5.980 - 39.193 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 5.146 5.273 5.531 - 5.531 5.648 5.753 5.862 5.980 - 39.193 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The Intelligence Training Equipment P-1 line procures equipment for use in entry level, intermediate, and advanced training in the General Intelligence and Cryptologic and Signals Intelligence related career fields. The equipment supports training for intelligence officers, geospatial analysts, targeteers, operations analysts, ground and airborne language analysts, airborne intelligence, surveillance, and reconnaissance analysts, network analysts, and all communications (except communications security) and electronic intelligence analysts. The systems support multiple intelligence, surveillance, and reconnaissance applications. The major focus of the systems is to provide the sole source for functional training on the newest generation of intelligence systems with an emphasis on computer-based training systems through modeling and simulation, as well as live, virtual, and constructive capabilities. This equipment is critical in preparing military intelligence personnel to support warfighting commanders and the National Intelligence Program (NIP). The equipment supports enterprise-wide intelligence training for Air Force (AF), Department of War (DoW), Department of Homeland Security (DHS), and Joint/Coalition partner personnel at Goodfellow Air Force Base (GAFB), Texas. PE 0804733F GENERAL INTELLIGENCE SKILL TRAINING (GIST) GOODFELLOW INTELLIGENCE TRAINING ARCHITECTURE (GITA) UPGRADE: Continues to incorporate new equipment to support the development of the enterprise architecture, consolidating multiple networks and systems into a single, integrated GITA for training. Funding for this exhibit contained in PE 0804733F. PE 0804733F GENERAL INTELLIGENCE SKILL TRAINING LI 832060 - Intelligence Training Equipment Air Force UNCLASSIFIED Page 1 of 7 P-1 Line #17 Volume 1 - 77 === page 114 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 832060 / Intelligence Training Equipment Equip / BSA 2: Intelligence Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Intelligence Training Equipment P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 5.146 - / 5.273 - / 5.531 - / - - / 5.531 - / - - / 5.146 - / 5.273 - / 5.531 - / - - / 5.531 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: PE 0804733F GENERAL INTELLIGENCE SKILL TRAINING GOODFELLOW INTELLIGENCE TRAINING ARCHITECTURE (GITA) FY2027 funding will be used on the GITA infrastructure to modernize/upgrade the training network backbone and delivery systems supporting over 8,500 students annually. Upgrades ensure that GITA meets/exceeds the latest in cyber security requirements at each security level. GITA provides lifecycle support of the hardware and software required to deliver training designed to meet operational customer requirements. GITA encompasses the following: student workstations, network, servers, storage solutions, thin client technology, scenariobased modeling and simulation models (to include live, virtual, and constructive capabilities), courseware development software, delivery servers, application hardware, and networking equipment. GITA aligns technologies with advanced teaching techniques, increases system capabilities to support ever-evolving operational intelligence tools, and addresses uncertainty in continued sustainment capabilities to reduce failure rates and outages. LI 832060 - Intelligence Training Equipment Air Force UNCLASSIFIED Page 2 of 7 P-1 Line #17 Volume 1 - 78 === page 115 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 832060 / Intelligence Training Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Intelligence Training Equipment MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 5.146 5.273 5.531 - 5.531 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 5.146 5.273 5.531 - 5.531 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 5.146 5.273 5.531 - 5.531 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Software - Intelligence Training Equipment Cost Recurring Cost Equipment (†) Modernization Subtotal: Recurring Cost - - - 5.146 1 5.146 5.273 1 5.273 5.531 1 5.531 - - - 5.531 1 5.531 - - - - - 5.146 - - 5.273 - - 5.531 - - - - - 5.531 Subtotal: Software Intelligence Training Equipment Cost - - - - - 5.146 - - 5.273 - - 5.531 - - - - - 5.531 Gross/Weapon System Cost - - - - - 5.146 - - 5.273 - - 5.531 - - - - - 5.531 Remarks: Procurement funds are for an IT system architecture and not individual units. The exhibit will not reflect unit price. (†) indicates the presence of a P-5a LI 832060 - Intelligence Training Equipment Air Force UNCLASSIFIED Page 3 of 7 P-1 Line #17 Volume 1 - 79 === page 116 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 O O C Item Number / Title [DODIC]: Intelligence Training Equipment FY Contractor and Location Method/Type or Funding Vehicle (†) 2025 Various / Various Various AETC May 2025 Nov 2025 1 5.146 Y Feb 2025 (†) 2026 Various / Various Various AETC May 2026 Nov 2026 1 5.273 Y Feb 2026 (†) 2027 Various / Various Various AETC May 2027 Nov 2027 1 5.531 Y Feb 2027 Cost Elements Equipment Modernization Equipment Modernization Equipment Modernization (†) P-1 Line Item Number / Title: 832060 / Intelligence Training Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 832060 - Intelligence Training Equipment Air Force UNCLASSIFIED Page 4 of 7 P-1 Line #17 Volume 1 - 80 === page 117 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 832060 / Intelligence Training Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Intelligence Training Equipment Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Equipment Modernization 1 2025 AF 1 0 1 1 2026 AF 1 0 1 1 2027 AF 1 0 1 A - - - - - - 1 0 A - - - - - 1 1 O C T N O V LI 832060 - Intelligence Training Equipment Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 5 of 7 S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 81 === page 118 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 832060 / Intelligence Training Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Intelligence Training Equipment Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Equipment Modernization 1 2025 AF 1 1 0 1 2026 AF 1 0 1 1 2027 AF 1 0 1 0 - 1 0 A - O C T N O V LI 832060 - Intelligence Training Equipment Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 7 S E P O C T 1 N O V 0 D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 82 === page 119 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 832060 / Intelligence Training Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: Intelligence Training Equipment Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Various - Various MSR For 2027 1-8-5 For 2027 MAX For 2027 1 1 1 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 1 Manufacturing PLT 8 Total After Oct 1 6 14 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 832060 - Intelligence Training Equipment Air Force UNCLASSIFIED Page 7 of 7 P-1 Line #17 Volume 1 - 83 === page 120 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 84 === page 121 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 832070 / Intelligence Comm Equipment Equip / BSA 2: Intelligence Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Procurement Quantity (Units in Each) - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 36.449 36.428 37.717 - 37.717 34.786 35.362 36.014 36.737 0.000 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 36.449 36.428 37.717 - 37.717 34.786 35.362 36.014 36.737 0.000 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 36.449 36.428 37.717 - 37.717 34.786 35.362 36.014 36.737 0.000 Total 253.493 253.493 253.493 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: PE 0207431F Combat Air Intelligence System Activities - P-40A CAIS PROC funds in Intelligence communications Equipment is used for the procuring of Unit Level Intelligence (ULI) systems, Enhanced Geospatial Product Library (eGPL) products, and Joint Targeting Tool (JTT) systems for the targeting enterprise. UNIT LEVEL INTELLIGENCE (ULI) SYSTEMS & Center of Excellence (COE): ULI fields the Toolkit for Intelligence Targeting Analysis (TITAN) and Targeting Application Workstation (TAW) systems which are used by intelligence analysts to produce Targeting and Mission Planning materials. The ULI COE provides reach back support for the field units on hardware and software issues. The COE also provides MX/IA patch development and distribution services. Enhanced GEOSPATIAL PRODUCT LIBRARY (eGPL): eGPL provides all AF units access to digital GEOINT and targeting data products in support of targeting, intelligence and mission planning processes, including support to units deploying to Southwest Asia and North Africa. It provides the sole resource to store and immediately retrieve large digital files and mission essential GEOINT data required to conduct AF mission sets. This storage includes tape drives to ensure data survivability and rapid back-up/restoration 20 times faster than network technology, freeing units critical time to support mission tasks. JOINT TARGETING TOOLBOX (JTT): Provides JTT servers for interfacing programs to test against. Servers are needed on Unclassified, Secret, and TS/SCI environments and will require software licenses to support operations. Targeting and Geospatial-Intelligence (T&G) Program Management Office (PMO): Provides the infrastructure that enables the agile development, sustainment, and fielding of new T&G capabilities, and ensures that the technical baseline is established and controlled by the Government. Sustainment includes help desk support, documentation, information assurance, STIGs/TCNOs, software patches and fixes. Fielding supports ULI, eGPL, JTT, Marauder, and any new T&G capability not fielded via other paths. This program is part of the overarching Kessel Run portfolio. Starting in FY25, all PE 0207431F funding will be transferred to ACC/A2. PE 0305249F AF JWICS Enterprise - Provides funding for purchase of the AF SCI Deployable Intelligence Communications Equipment (DICE) Kits. Procurement package provides COTS equipment, systems, virtual tools, and instructions to establish functional T-SCIFs containing classified systems, communications, power, and VTC capabilities to enable intelligence and operational functions. The system permits LI 832070 - Intelligence Comm Equipment Air Force UNCLASSIFIED Page 1 of 28 P-1 Line #18 Volume 1 - 85 === page 122 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 832070 / Intelligence Comm Equipment Equip / BSA 2: Intelligence Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A wings/units to receive, process, send, and use SCI data and intelligence to support their mission from either highly austere "bare-base stand-alone location(s), or to fall-in on existing main operating bases/ locations. With the creation of the new PE 0305249F (AF JWICS Enterprise), the 3080 funding for DICE kits moved to 0305249F beginning in FY26. PE 0305022F ISR Modernization & Automation Dvmt (IMAD) - P-40A IMAD develops and demonstrates technology required to implement automation and machine intelligence on ISR systems. It is an innovation-driven fund which enables new technologies, capabilities, and Airman ideas to receive "kick-start funding. SECAF directed the AF to invest in a more automated environment to relieve strain on manpower in the out years. IMAD was started to create ISR enterprise-wide effects using machine intelligence. PE 0305146F Defense Joint Counterintelligence Activities - P-40A Enables Cyber Counterintelligence and Technical Surveillance/Technical Surveillance Countermeasures (TSCM} support to counterintelligence operations conducted by the Air Force Office of Special Investigations (AFOSI) for AF and DoW entities, to detect and deter covert activities conducted by Foreign Intelligence Services seeking to compromise classified or sensitive information. The technical equipment required for these investigations is unique and complex, and is a part of the formally designated USAF TSCM weapons system and/or the Cyber Counterintelligence suite of tools. PE 0305179F Integrated Broadcast Service (IBS) - P-40A INTEGRATED BROADCAST SERVICE (IBS): The IBS is a system-of-systems designed to disseminate integrated threat warnings, blue force tracking, and intelligence information, derived from multiple sensors and sources for 24/7/365 data coverage worldwide. IBS is a joint program with the Services, National Agencies, and collaborating nations with the Air Force designated the lead service. IBS provides intelligence producers and information sources the means to analyze and disseminate strategic, operational, tactical intelligence, high priority threat warnings, and friendly force tracking time-critical, safety of life information directly to the warfighter. The IBS operational baseline represents the migration, integration, and consolidation of existing tactical data dissemination into a future common architecture message format. Modernization efforts are executing to increase IBS performance and resilience and shorten the kill chain by expanding the broadcast to UHF SATCOM Wide-band Code Division Multiple Access (WCDMA) and other alternate broadcasts, integrating next generation terminals at Common Integrated Broadcast Uplink sites, transitioning legacy IBS network services to a hybrid cloud architecture, updating existing Communications Security (COMSEC) devices, and developing testing tools to perform adequate verification and validation before new capabilities are operationally fielded. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. Funding for this exhibit contained in PE 0305179F. PE 0305192F Military Intelligence Program (MIP) Activities - P-40A Will fund information recovery technology for Enterprise Service Centers increasing resiliency of the network and enabling failover to ensure data survivability. FY26 procurement funding will be used to procure servers, storage devices, associated hardware upgrades, and installation costs to ensure a robust recovery system. Funding for this exhibit contained in PE 0305192F. PE 0305221F Network-Centric Collaborative Targeting - P-40A Network Centric Collaborative Targeting (NCCT) is the Department of the Air Force's (DAF) program of record performing platform agnostic, tactical, cooperative geolocation against time sensitive targets. At its core, NCCT is a cloud-based, Joint, multi-intelligence (multi-INT) sensor network which provides the warfighter fused target locations and enables sensor command and control (C2) through machine-to-machine interfaces. Operationally, NCCT is currently deployed on a variety of DAF aircraft, the DCGS, and other DoW assets. NCCT's utilization of intelligent sensor mesh networks, multi-INT fusion, and its cross-domain information sharing and sensor C2 are key contributions to the Sensing Grid's sensing, sense making, integration, and global orchestration thrusts. NCCT includes network management software, a network messaging standard, correlation and fusion software, software supporting tactical-to-national Signals Intelligence (SIGINT) Concept of Operations (CONOPS), multi-level security hardware and software items, and operator interfaces. NCCT procurement funding supports hardware, software, software licenses, and maintenance agreements for hardware and LI 832070 - Intelligence Comm Equipment Air Force UNCLASSIFIED Page 2 of 28 P-1 Line #18 Volume 1 - 86 === page 123 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 832070 / Intelligence Comm Equipment Equip / BSA 2: Intelligence Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A software refreshes required to ensure on-going NCCT operations of NCCT software and program-owned hardware, and global web-enabled services, while satisfying DoW standards and Information Assurance (IA) requirements. Funding for this exhibit contained in PE 0305221F. LI 832070 - Intelligence Comm Equipment Air Force UNCLASSIFIED Page 3 of 28 P-1 Line #18 Volume 1 - 87 === page 124 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 832070 / Intelligence Comm Equipment Equip / BSA 2: Intelligence Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 Combat Air Intelligence System Activities A - / - - / 12.066 - / 7.158 - / 7.198 - / - - / 7.198 P-5 Defense Joint Counterintelligence Activities A - / - - / 2.415 - / 2.943 - / 2.850 - / - - / 2.850 P-5 Integrated Broadcast Service (IBS) P-5a, P-21 A - / - - / 12.041 - / 10.780 - / 9.327 - / - - / 9.327 P-5 Military Intelligence Program (MIP) Activities P-5a, P-21 A - / - - / 7.089 - / 1.947 - / 8.181 - / - - / 8.181 P-5 Network-Centric Collaborative Targeting P-5a, P-21 A - / - - / 2.838 - / 3.872 - / 3.559 - / - - / 3.559 P-5 AF JWICS Enterprise A - / - - / 0.000 - / 9.728 - / 6.602 - / - - / 6.602 P-40 Total Gross/Weapon System Cost - / - - / 36.449 - / 36.428 - / 37.717 - / - - / 37.717 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: PE 0207431F Combat Air Intelligence System Activities ENHANCED GEOSPATIAL PRODUCT LIBRARY (EGPL): Funding provides for the capital equipment replacement of EGPL servers, drives, and associated equipment to ensure current, dependable data repository for intelligence threat assessment and combat mission planning support at over 260 units worldwide. UNIT LEVEL INTELLIGENCE (ULI) SYSTEMS & Center of Excellence (COE): Funding provides for the capital equipment replacement of ULI systems providing crucial capabilities to the Warfighter to include Intelligence Preparation of the Operational Environment (IPOE), data gathering and compilation, support to mission execution, intelligence reporting, targeting, weapon systems video processing, and postmission assessment support at over 327 units worldwide. The COE is critical to the ULI mission performing all system integration work, functional testing, cyber security scans, MX/IA releases, help desk support, and fields the hardware and software components needed to successfully employ the Targeting Applications Workstation and the Toolkit for Intelligence Targeting Analysis. JOINT TARGETING TOOLBOX (JTT): Funding will be used to provide software sustainment and fielding support for existing JTT operational instances. This includes Help Desk, training, and MX/IA patch updates. In addition, funding will support the testing and fielding of the JTT software into a non-GCCS stand alone cloud environment for greater accessibility and maintenance response capability. Targeting and Geospatial Intelligence (T&G) PMO: Funding will be used to ensure the T&G PMO maintains management oversight of both the technical and programmatic aspects of existing T&G capabilities. Starting in FY25, all PE 0207431F funding will be transferred to ACC/A2. PE 0305249F AF SCI Enterprise - DICE kits enable sustained air operations delivering platform agnostic forward base intelligence operations in decentralized, high-risk environments while executing distributed Contingency Intelligence Network (CIN) operations and Mission Task Orders (MTO). DICE kits can be rapidly deployed in support of deployed warfighters providing remote network connectivity to the AFSCI enterprise network. With the creation of the new PE 0305249F (AF JWICS Enterprise), the 3080 funding for DICE kits moved to PE 0305249F beginning in FY26. PE 0305022F ISR Modernization & Automation Dvmt (IMAD) - Starting in FY24 IMAD has requested to re-align procurement funding to meet increasing requirements for research and development activities. No funding requested for FY 2027. PE 0305146F Defense Joint Counterintelligence Activities - LI 832070 - Intelligence Comm Equipment Air Force UNCLASSIFIED Page 4 of 28 P-1 Line #18 Volume 1 - 88 === page 125 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 832070 / Intelligence Comm Equipment Equip / BSA 2: Intelligence Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A FY2024 funding procures the periodic refresh of equipment to provide state of the art capabilities to detect and neutralize foreign intelligence entity (FIE) and criminal activities targeted against sensitive and classified AF and DoW information and activities. PE 0305179F Integrated Broadcast Service (IBS) IBS procurement funding utilized for equipment and support focused in the following areas: IBS Over the Air (OTA) Modernization (utilizing Primary, Alternate, Contingency, and Emergency (PACE) broadcast communications pathways), Enhancements to existing baseline OTA broadcast capabilities, IBS-Network Services (IBS-NS) Modernization (enabling increased throughput, timeliness, and portability of critical intelligence data), IBS-NS Baseline Enhancements, and IBS Enterprise Support. Funding also procures portable radio communication equipment and radio receivers/transmitters. FY 2027 funding supports: 1. IBS OTA Modernization: Modernization efforts include other broadcast communications pathways in support of IBS PACE plan. This funding will provide fielding of IBS-Low Earth Orbit (IBS-L) and IBS-Mobile User Objective System (MUOS) equipment. Funding procures cross domain solutions (CDS) equipment required to sanitize data and dedicated multi-protocol labeled switching (MPLS) lines for IBS-Coalition Beyond FVEY capabilities. In addition, funding procures enhancements to other broadcast communication pathways in support of the developing IBS PACE plan including diplexers and high gain directional antennas. In response to operational threats or events, additional or higher priority Primary, Alternate, Contingency, and Emergency (PACE) communications paths (e.g., IBS MUOS UHF Legacy Extension (IBSMX), L-Band Tactical Satellite (LTAC), High Frequency (HF) capability, Starshield, Line of Sight (LOS), Beyond FVEY, etc.) equipment may be procured. 2. IBS OTA Baseline Enhancements: Efforts include cryptographic updates for IBS-Alternative Path (IBS-A) and IBS-L. The FY 2027 request was reduced by $1.521M because in FY 2027 IBS-NS Modernization focuses on development efforts. PE 0305192F Military Intelligence Program (MIP) Activities FY2027 funding will enable procurement information recovery technology for Enterprise Service Centers to increase resiliency of the network and enable failover to ensure data survivability. Funds will be used to implement development support hardware through the procurement of servers, storage devices, associated hardware upgrades, and installation costs. Funding will enable USAFE/USAFA Remote Core Service (RSC) hardware infrastructure to support remote ESC locations, add resiliency and new equipment to ensure recovery and failover operations. PE 0307577F Intelligence Mission Data (IMD) - P-40A IMD procurement activities were completed in FY22. No funding requested for FY 2026. PE 0305221F Network-Centric Collaborative Targeting FY 2027 funding will be utilized to procure additional data guard equipment and update cross domain solutions for the purpose of storage, analysis, and sharing of intelligence data on a cloud computing infrastructure at the TOP SECRET/Sensitive Compartmented Information (TS/SCI), SECRET, and UNCLASSIFIED levels. FY 2027 funding will support continued integration of new multi-intelligence (multi-INT) use cases, the continuation of rapid software deliveries and installs, and continued participation in Joint demonstrations and exercises as necessary. Due to the rapidly changing threat environment, NCCT's DevSecOps processes, and operational demand from platforms leveraging NCCT capabilities, the acquisition program manager has the authority to redirect funding as necessary to meet currently stated and/or emerging operational requirements. NCCT efforts include, but are not limited to, fielding activities such as associated system integration, assembly, test and checkout; certification; non-developmental mission system upgrades, software integration and updates, software licenses, systems engineering, test and evaluation, support equipment, and Program Support Costs (PSC). PE 0208288F IDA LI 832070 - Intelligence Comm Equipment Air Force UNCLASSIFIED Page 5 of 28 P-1 Line #18 Volume 1 - 89 === page 126 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 832070 / Intelligence Comm Equipment Equip / BSA 2: Intelligence Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A No funding requested for FY 2027. PE 1203400F Space Superiority Intelligence No funding requested for FY 2026. LI 832070 - Intelligence Comm Equipment Air Force UNCLASSIFIED Page 6 of 28 P-1 Line #18 Volume 1 - 90 === page 127 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 832070 / Intelligence Comm Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Combat Air Intelligence System Activities MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 12.066 7.158 7.198 - 7.198 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 12.066 7.158 7.198 - 7.198 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 12.066 7.158 7.198 - 7.198 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Combat Air Intelligence System Activities Cost Recurring Cost ULI/eGPL Equipment Systems - - - 0.011 475 5.044 5.829 Deployable JWICS - - - 0.120 39 4.664 - USAFE Comm equipment TACLANEs - - - 0.022 6 0.129 0.380 Subtotal: Recurring Cost - - - - - 9.837 - MILCON Fitout - - - - - 0.000 USAFE Comm Equipment - - - 1.715 1.715 NASIC Tech SIGINT equip - - - - - 0.000 0.399 Subtotal: Non Recurring Cost - - - - - 1.715 - - - - - - 11.552 - 0.514 0.550 0.514 - 1 5.829 - - 5.905 - - - - - 5.905 0.000 - - 0.000 - - - - - 0.000 0.380 - - 0.386 - - - - - 0.386 - 6.209 - - 6.291 - - - - - 6.291 - - 0.000 - - 0.000 - - - - - 0.000 - - - - - - - - - - - - 0.399 - - - - - - - - - - 0.399 - - 0.000 - - - - - 0.000 - 6.608 - - 6.291 - - - - - 6.291 0.550 - - 0.907 - - - - - 0.907 0.550 - - 0.907 - - - - - 0.907 1 Non Recurring Cost Subtotal: Hardware Combat Air Intelligence System Activities Cost 1 1 Support - Combat Air Intelligence System Activities Cost Advisory & Assistance Services (DMS) - - - 0.514 Subtotal: Support - Combat Air Intelligence System Activities Cost - - - - LI 832070 - Intelligence Comm Equipment Air Force 1 - 1 - UNCLASSIFIED Page 7 of 28 P-1 Line #18 Volume 1 - 91 === page 128 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 832070 / Intelligence Comm Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Combat Air Intelligence System Activities MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Gross/Weapon System Cost Unit Cost ($ M) - FY 2025 Total Cost Qty (Each) Unit Cost ($ M) - LI 832070 - Intelligence Comm Equipment Air Force ($ M) - - FY 2026 Total Cost Qty (Each) ($ M) - 12.066 Unit Cost ($ M) - FY 2027 Base Total Cost Qty (Each) ($ M) - 7.158 UNCLASSIFIED Page 8 of 28 Unit Cost ($ M) - FY 2027 OOC Total Cost Qty (Each) ($ M) - 7.198 Unit Cost ($ M) - P-1 Line #18 FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) - ($ M) - - Total Cost Qty (Each) ($ M) - 7.198 Volume 1 - 92 === page 129 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 832070 / Intelligence Comm Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Defense Joint Counterintelligence Activities MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 2.415 2.943 2.850 - 2.850 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 2.415 2.943 2.850 - 2.850 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 2.415 2.943 2.850 - 2.850 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Counterintelligence Cyber Activities Cost Recurring Cost CCA - - - 1.885 1.885 2.396 2.396 2.289 2.289 - - - 2.289 - - - - - 1.885 - - 2.396 - - 2.289 - - - - - 2.289 - - - - - 1.885 - - 2.396 - - 2.289 - - - - - 2.289 - - - 0.031 17 0.530 0.032 17 0.547 0.033 17 0.561 - - - 0.033 17 0.561 - - - - - 0.530 - - 0.547 - - 0.561 - - - - - 0.561 Subtotal: Hardware Technical Surveillance Activities Cost - - - - - 0.530 - - 0.547 - - 0.561 - - - - - 0.561 Gross/Weapon System Cost - - - - - 2.415 - - 2.943 - - 2.850 - - - - - 2.850 Subtotal: Recurring Cost Subtotal: Hardware Counterintelligence Cyber Activities Cost 1 1 1 1 2.289 Hardware - Technical Surveillance Activities Cost Recurring Cost TSA Subtotal: Recurring Cost LI 832070 - Intelligence Comm Equipment Air Force UNCLASSIFIED Page 9 of 28 P-1 Line #18 Volume 1 - 93 === page 130 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 832070 / Intelligence Comm Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Integrated Broadcast Service (IBS) MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 12.041 10.780 9.327 - 9.327 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 12.041 10.780 9.327 - 9.327 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 12.041 10.780 9.327 - 9.327 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - IBS OTA Modernization Cost Non Recurring Cost PRC-117G MUOS Purchase (†) (Refurbished) Cross Domain Servers (†) Radiant Mercury Build (†) Multi-Protocol Labeled Switching (MPLS) Lines (†) Frequency Converters for ENTR V4 Tactical (†) Terminal KG-175D Cryptographic (†) Devices Report Controller (†) Equipment PRC-117G Purchase (†) (New) Diplexers and High Gain Directional Antennas (†) - - - 0.024 14 0.333 - - - - - - - 0.175 - - - - - - - - - - - - - - - - - - - - - - - - 2 0.350 0.035 0.250 2 0.500 - 0.075 2 - - 0.049 - - - - - - - - - - - - LI 832070 - Intelligence Comm Equipment Air Force - 0.000 - - - - 2 0.070 - - - 0.035 2 0.070 0.200 1 0.200 - - - 0.200 1 0.200 0.150 0.065 1 0.065 - - - 0.065 1 0.065 10 0.487 - - - - - - - - - - - 0.000 0.036 12 0.430 - - - 0.036 12 0.430 - - - - 0.011 14 0.160 - - - 0.011 14 0.160 - - - - - 0.058 12 0.700 - - - 0.058 12 0.700 - - - - - 0.009 44 0.375 - - - 0.009 44 0.375 UNCLASSIFIED Page 10 of 28 - P-1 Line #18 - 0.000 Volume 1 - 94 === page 131 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 832070 / Intelligence Comm Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Integrated Broadcast Service (IBS) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) Subtotal: Non Recurring Cost FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) - - - - - 0.333 - - 1.487 - - 2.000 - - - - - 2.000 - - - - - 0.333 - - 1.487 - - 2.000 - - - - - 2.000 - - - - - - 0.162 0.648 0.188 20 3.768 - - - 0.188 20 3.768 - - - - - - - - 0.648 - - 3.768 - - - - - 3.768 - - - - - - - - 0.648 - - 3.768 - - - - - 3.768 - - - 0.091 12 1.090 0.093 33 3.055 - - - - - - - - - Subtotal: Non Recurring Cost - - - - - 1.090 - - 3.055 - - - - - - - - - Subtotal: Hardware - IBS-NS Modernization Cost - - - - - 1.090 - - 3.055 - - - - - - - - - Subtotal: Hardware - IBS OTA Modernization Cost Hardware - IBS OTA Baseline Enhancements Cost Non Recurring Cost KIV-7M Replacement Cryptographic (†) Devices Subtotal: Non Recurring Cost Subtotal: Hardware - IBS OTA Baseline Enhancements Cost 4 Hardware - IBS-NS Modernization Cost Non Recurring Cost IBS-NS Modernization Cloud Enablement (†) (Dell Servers) Hardware - Integrated Broadcast Service (IBS) Enterprise Support Cost Non Recurring Cost JTT-Next Generation (†) Radio Triplexers Subtotal: Non Recurring Cost Subtotal: Hardware Integrated Broadcast Service (IBS) Enterprise Support Cost - - - - - - 0.015 25 0.386 - - - - - - - - - - - - - - - - - 0.386 - - - - - - - - - - - - - - - - - 0.386 - - - - - - - - - 1.370 2.700 2.700 - - - - - - - - - 1.370 - 2.700 - - - - - - - - - Support - Integrated Broadcast Service (IBS) Enterprise Support Cost Enterprise Support - - - 1.370 Subtotal: Support Integrated Broadcast Service (IBS) Enterprise Support Cost - - - - 1 - 1 - Support - Integrated Broadcast Service (IBS) Program Support Cost (PSC) Cost LI 832070 - Intelligence Comm Equipment Air Force UNCLASSIFIED Page 11 of 28 P-1 Line #18 Volume 1 - 95 === page 132 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 832070 / Intelligence Comm Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Integrated Broadcast Service (IBS) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements PSC Contractor Services Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) - - - 9.248 Subtotal: Support Integrated Broadcast Service (IBS) Program Support Cost (PSC) Cost - - - - Gross/Weapon System Cost - - - - (†) FY 2026 Total Cost Qty (Each) ($ M) 1 Unit Cost ($ M) 9.248 2.504 - 9.248 - - 12.041 - FY 2027 Base Total Cost Qty (Each) ($ M) 1 Unit Cost ($ M) 2.504 3.559 - 2.504 - - 10.780 - FY 2027 OOC Total Cost Qty (Each) ($ M) 1 Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) 3.559 - - - 3.559 1 3.559 - 3.559 - - - - - 3.559 - 9.327 - - - - - 9.327 indicates the presence of a P-5a LI 832070 - Intelligence Comm Equipment Air Force UNCLASSIFIED Page 12 of 28 P-1 Line #18 Volume 1 - 96 === page 133 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 O O C Item Number / Title [DODIC]: Integrated Broadcast Service (IBS) FY Contractor and Location Method/Type or Funding Vehicle 2025 OGA / N/A MIPR AFLCMC/C3BM (†) 2026 OGA / N/A MIPR AFLCMC/C3BM Oct 2025 Apr 2026 2 0.175 Y (†) 2027 OGA / N/A MIPR AFLCMC/C3BM Mar 2027 Sep 2027 2 0.035 Y (†) 2026 OGA / N/A MIPR AFLCMC/C3BM Oct 2025 Apr 2026 2 0.250 Y (†) Radiant Mercury Build 2027 OGA / N/A MIPR AFLCMC/C3BM Mar 2027 Sep 2027 1 0.200 Y Multi-Protocol Labeled Switching (MPLS) Lines 2026 OGA / N/A MIPR AFLCMC/C3BM Oct 2025 Apr 2026 2 0.075 Y Multi-Protocol Labeled Switching (MPLS) Lines 2027 OGA / N/A MIPR AFLCMC/C3BM Mar 2027 Sep 2027 1 0.065 Y 2026 OGA / N/A MIPR AFLCMC/C3BM Nov 2025 Apr 2026 10 0.049 Y Cost Elements PRC-117G MUOS Purchase (†) (Refurbished) Cross Domain Servers Cross Domain Servers Radiant Mercury Build Frequency Converters for ENTR V4 Tactical Terminal (†) (†) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Jul 2025 Feb 2026 14 0.024 Y Qty (Each) 2027 OGA / N/A MIPR AFLCMC/C3BM Mar 2027 Sep 2027 12 0.036 Y (†) 2027 OGA / N/A MIPR AFLCMC/C3BM Mar 2027 Sep 2027 14 0.011 Y (†) 2027 OGA / N/A MIPR AFLCMC/C3BM Mar 2027 Sep 2027 12 0.058 Y 2027 OGA / N/A MIPR AFLCMC/C3BM Mar 2027 Sep 2027 44 0.009 Y (†) 2026 DRS / Beavercreek, OH PO AFLCMC/C3BM Oct 2025 Apr 2026 4 0.162 Y (†) 2027 DRS / Beavercreek, OH PO AFLCMC/C3BM Apr 2027 Oct 2027 20 0.188 Y 2025 CACI / Reston, VA PO AFLCMC/C3BM Feb 2026 Jul 2026 12 0.091 Y (†) 2026 CACI / Reston, VA PO AFLCMC/C3BM Sep 2026 Jan 2027 33 0.093 Y JTT-Next Generation Radio Triplexers 2026 MEG / Fairfax, VA PO AFLCMC/C3BM Jun 2026 Sep 2026 25 0.015 Y KG-175D Cryptographic Devices Report Controller Equipment PRC-117G Purchase (New) Diplexers and High Gain Directional Antennas KIV-7M Replacement Cryptographic Devices KIV-7M Replacement Cryptographic Devices IBS-NS Modernization Cloud Enablement (Dell Servers) IBS-NS Modernization Cloud Enablement (Dell Servers) (†) P-1 Line Item Number / Title: 832070 / Intelligence Comm Equipment RFP Issue Date indicates the presence of a P-21 LI 832070 - Intelligence Comm Equipment Air Force UNCLASSIFIED Page 13 of 28 P-1 Line #18 Volume 1 - 97 === page 134 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 832070 / Intelligence Comm Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Integrated Broadcast Service (IBS) Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P PRC-117G MUOS Purchase (Refurbished) 1 2025 AF 14 0 14 A - - - - - - - 14 A - - - - - 0 Cross Domain Servers 2 2026 AF 2 0 2 2 2027 AF 2 0 2 - 2 0 2 Radiant Mercury Build 3 2026 AF 2 0 2 3 2027 AF 1 0 1 A - - - - - - 2 0 1 Frequency Converters for ENTR V4 Tactical Terminal 4 2026 AF 10 0 10 A - - - - - 5 - - - - - 5 12 0 12 12 14 0 14 14 12 0 12 12 KG-175D Cryptographic Devices 5 2027 AF Report Controller Equipment 6 2027 AF PRC-117G Purchase (New) 7 2027 AF KIV-7M Replacement Cryptographic Devices 8 2026 AF 4 0 4 8 2027 AF 20 0 20 A - - - - - - 4 0 20 IBS-NS Modernization Cloud Enablement (Dell Servers) 9 2026 AF 33 0 33 A O C T LI 832070 - Intelligence Comm Equipment Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 28 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G 33 S E P Volume 1 - 98 === page 135 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 832070 / Intelligence Comm Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Integrated Broadcast Service (IBS) Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E PRC-117G MUOS Purchase (Refurbished) 1 2025 AF 14 14 0 0 Cross Domain Servers 2 2026 AF 2 2 0 2 2027 AF 2 0 2 0 A - - - - - - 1 A - - - - - - 1 1 Radiant Mercury Build 3 2026 AF 2 2 0 3 2027 AF 1 0 1 0 0 Frequency Converters for ENTR V4 Tactical Terminal 4 2026 AF 10 5 5 - - - - - - 5 0 12 0 12 A - - - - - - 5 7 14 0 14 A - - - - - - 2 12 12 0 12 A - - - - - - 12 0 A - - - - - - KG-175D Cryptographic Devices 5 2027 AF Report Controller Equipment 6 2027 AF PRC-117G Purchase (New) 7 2027 AF KIV-7M Replacement Cryptographic Devices 8 2026 AF 4 4 0 8 2027 AF 20 0 20 0 14 6 IBS-NS Modernization Cloud Enablement (Dell Servers) 9 2026 AF 33 0 33 O C T LI 832070 - Intelligence Comm Equipment Air Force N O V D E C 20 J A N 13 F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 28 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 99 === page 136 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 832070 / Intelligence Comm Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: Integrated Broadcast Service (IBS) Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 OGA - N/A 1 8 14 6 10 7 17 0 0 0 0 2 OGA - N/A 1 1 3 0 0 0 0 2 6 6 12 3 OGA - N/A 1 2 2 0 0 0 0 1 6 6 12 4 OGA - N/A 1 1 10 5 2 5 7 0 0 0 0 5 OGA - N/A 1 5 12 5 6 6 12 0 0 0 0 6 OGA - N/A 1 5 12 1 6 6 12 0 0 0 0 7 OGA - N/A 1 8 14 0 0 0 0 6 6 6 12 8 DRS - Beavercreek, OH 1 10 20 0 0 0 0 4 7 6 13 9 CACI - Reston, VA 1 10 20 0 0 0 0 1 12 4 16 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 832070 - Intelligence Comm Equipment Air Force UNCLASSIFIED Page 16 of 28 P-1 Line #18 Volume 1 - 100 === page 137 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 832070 / Intelligence Comm Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Military Intelligence Program (MIP) Activities MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 7.089 1.947 8.181 - 8.181 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 7.089 1.947 8.181 - 8.181 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 7.089 1.947 8.181 - 8.181 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Military Intelligence Program (MIP) Activities Cost Recurring Cost (†) - - - 7.089 7.089 1.947 1.947 8.181 8.181 - - - 8.181 Subtotal: Recurring Cost - - - - - 7.089 - - 1.947 - - 8.181 - - - - - 8.181 Subtotal: Hardware - Military Intelligence Program (MIP) Activities Cost - - - - - 7.089 - - 1.947 - - 8.181 - - - - - 8.181 Gross/Weapon System Cost - - - - - 7.089 - - 1.947 - - 8.181 - - - - - 8.181 MIP Activities (†) 1 1 1 1 8.181 indicates the presence of a P-5a LI 832070 - Intelligence Comm Equipment Air Force UNCLASSIFIED Page 17 of 28 P-1 Line #18 Volume 1 - 101 === page 138 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 Cost Elements (†) O O C P-1 Line Item Number / Title: 832070 / Intelligence Comm Equipment FY Contractor and Location Method/Type or Funding Vehicle Item Number / Title [DODIC]: Military Intelligence Program (MIP) Activities Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date MIP Activities (†) 2025 Various / Various Various Hanscom AFB Jan 2025 Jan 2025 1 7.089 Y Nov 2024 MIP Activities (†) 2026 Various / Various Various Hanscom AFB Jan 2026 Jan 2026 1 1.947 Y Nov 2025 MIP Activities (†) 2027 Various / Various Various Hanscom AFB Jan 2027 Jan 2027 1 8.181 Y Nov 2026 indicates the presence of a P-21 LI 832070 - Intelligence Comm Equipment Air Force UNCLASSIFIED Page 18 of 28 P-1 Line #18 Volume 1 - 102 === page 139 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 832070 / Intelligence Comm Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Military Intelligence Program (MIP) Activities Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Fiscal Year 2026 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E MIP Activities 1 2025 AF 1 0 1 1 2026 AF 1 0 1 1 2027 AF 1 0 1 A1 0 A1 0 1 O C T LI 832070 - Intelligence Comm Equipment Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 19 of 28 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 103 === page 140 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 832070 / Intelligence Comm Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Military Intelligence Program (MIP) Activities Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E MIP Activities 1 2025 AF 1 1 0 1 2026 AF 1 1 0 1 2027 AF 1 0 1 0 0 A1 O C T LI 832070 - Intelligence Comm Equipment Air Force N O V D E C J A N 0 F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 20 of 28 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 104 === page 141 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 832070 / Intelligence Comm Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: Military Intelligence Program (MIP) Activities Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Various - Various MSR For 2027 1-8-5 For 2027 MAX For 2027 1 1 1 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 1 Manufacturing PLT 4 Total After Oct 1 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 832070 - Intelligence Comm Equipment Air Force UNCLASSIFIED Page 21 of 28 P-1 Line #18 Volume 1 - 105 4 === page 142 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 832070 / Intelligence Comm Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Network-Centric Collaborative Targeting MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 2.838 3.872 3.559 - 3.559 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 2.838 3.872 3.559 - 3.559 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 2.838 3.872 3.559 - 3.559 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Network-Centric Collaborative Targeting Cost Non Recurring Cost Computer Servers & - - - 1.218 Subtotal: Non Recurring Cost - - - - Subtotal: Hardware - Network-Centric Collaborative Targeting Cost - - - - (†) Data Guards 1 1.218 1.953 - 1.218 - - 1.218 - 0.411 0.968 1 1.953 1.494 - 1.953 - - 1.953 - 0.968 0.372 1 1.494 - - - 1.494 1 1.494 - 1.494 - - - - - 1.494 - 1.494 - - - - - 1.494 0.372 - - - 0.372 Software - Network-Centric Collaborative Targeting Cost Non Recurring Cost (†) - - - 0.411 Subtotal: Non Recurring Cost - - - - - 0.411 - - 0.968 - - 0.372 - - - - - 0.372 Subtotal: Software - Network-Centric Collaborative Targeting Cost - - - - - 0.411 - - 0.968 - - 0.372 - - - - - 0.372 1.209 0.951 0.951 1.693 1.693 - - - 1.693 1.209 - 0.951 - 1.693 - - - - Software Licenses 1 1 1 1 0.372 Support - Network-Centric Collaborative Targeting Cost Program Support Costs (PSC) Contractor Services (†) Subtotal: Support - NetworkCentric Collaborative Targeting Cost - - - 1.209 - - - - LI 832070 - Intelligence Comm Equipment Air Force 1 - 1 - UNCLASSIFIED Page 22 of 28 1 - P-1 Line #18 1 - 1.693 1.693 Volume 1 - 106 === page 143 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 832070 / Intelligence Comm Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Network-Centric Collaborative Targeting MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Gross/Weapon System Cost (†) Unit Cost ($ M) - FY 2025 Total Cost Qty (Each) Unit Cost ($ M) - ($ M) - - FY 2026 Total Cost Qty (Each) ($ M) - 2.838 Unit Cost ($ M) - FY 2027 Base Total Cost Qty (Each) ($ M) - 3.872 Unit Cost ($ M) - FY 2027 OOC Total Cost Qty (Each) ($ M) - 3.559 Unit Cost ($ M) - FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) - ($ M) - - Total Cost Qty (Each) ($ M) - 3.559 indicates the presence of a P-5a LI 832070 - Intelligence Comm Equipment Air Force UNCLASSIFIED Page 23 of 28 P-1 Line #18 Volume 1 - 107 === page 144 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 Cost Elements Computer Servers & Data (†) Guards Computer Servers & Data (†) Guards Computer Servers & Data (†) Guards (†) O O C P-1 Line Item Number / Title: 832070 / Intelligence Comm Equipment Item Number / Title [DODIC]: Network-Centric Collaborative Targeting FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) 2025 L3 Harris / Rockwall, TX Various AFLCMC/WI - ISR & SOF Feb 2025 Mar 2025 1 1.218 Y Dec 2024 2026 L3 Harris / Rockwall, TX Various AFLCMC/WI - ISR & SOF Feb 2026 Mar 2026 1 1.953 Y Dec 2025 2027 L3 Harris / Rockwall, TX Various AFLCMC/WI - ISR & SOF Feb 2027 Mar 2027 1 1.494 Y Dec 2026 Qty (Each) RFP Issue Date Software Licenses (†) 2025 L3 Harris / Rockwall, TX Various AFLCMC/WI - ISR & SOF Feb 2025 Mar 2025 1 0.411 Y Dec 2024 Software Licenses (†) 2026 L3 Harris / Rockwall, TX Various AFLCMC/WI - ISR & SOF Feb 2026 Mar 2026 1 0.968 Y Dec 2025 Software Licenses (†) 2027 L3 Harris / Rockwall, TX Various AFLCMC/WI - ISR & SOF Feb 2027 Mar 2027 1 0.372 Y Dec 2026 Program Support Costs (PSC) Contractor Services 2025 L3 Harris / Rockwall, TX Various AFLCMC/WI - ISR & SOF Feb 2025 Mar 2025 1 1.209 Y Dec 2024 Program Support Costs (PSC) Contractor Services 2026 L3 Harris / Rockwall, TX Various AFLCMC/WI - ISR & SOF Feb 2026 Mar 2026 1 0.951 Y Dec 2025 Program Support Costs (PSC) Contractor Services 2027 L3 Harris / Rockwall, TX Various AFLCMC/WI - ISR & SOF Feb 2027 Mar 2027 1 1.693 Y Dec 2026 indicates the presence of a P-21 LI 832070 - Intelligence Comm Equipment Air Force UNCLASSIFIED Page 24 of 28 P-1 Line #18 Volume 1 - 108 === page 145 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 832070 / Intelligence Comm Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Network-Centric Collaborative Targeting Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Fiscal Year 2026 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Computer Servers & Data Guards 1 2025 AF 1 0 1 1 2026 AF 1 0 1 1 2027 AF 1 0 1 A - 1 0 A - 1 0 1 Software Licenses 2 2025 AF 1 0 1 2 2026 AF 1 0 1 2 2027 AF 1 0 1 A - 1 0 A - 1 0 1 O C T LI 832070 - Intelligence Comm Equipment Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 25 of 28 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 109 === page 146 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 832070 / Intelligence Comm Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Network-Centric Collaborative Targeting Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Computer Servers & Data Guards 1 2025 AF 1 1 0 1 2026 AF 1 1 0 1 2027 AF 1 0 1 0 0 A - 1 0 Software Licenses 2 2025 AF 1 1 0 2 2026 AF 1 1 0 2 2027 AF 1 0 1 0 0 A O C T LI 832070 - Intelligence Comm Equipment Air Force N O V D E C J A N F E B 1 M A R 0 A P R M A Y J U N J U L A U G UNCLASSIFIED Page 26 of 28 S E P O C T N O V D E C J A N F E B P-1 Line #18 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 110 === page 147 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 832070 / Intelligence Comm Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: Network-Centric Collaborative Targeting Procurement Leadtime (Months) Initial ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 L3 Harris - Rockwall, TX 1 1 1 0 0 0 0 1 5 1 6 2 L3 Harris - Rockwall, TX 1 1 1 0 0 0 0 1 5 1 6 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 832070 - Intelligence Comm Equipment Air Force UNCLASSIFIED Page 27 of 28 P-1 Line #18 Volume 1 - 111 === page 148 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 832070 / Intelligence Comm Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: AF JWICS Enterprise MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 0.000 9.728 6.602 - 6.602 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.000 9.728 6.602 - 6.602 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.000 9.728 6.602 - 6.602 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - AF JWICS Enterprise Cost Recurring Cost ACC Deployable JWICS - - - - - 0.000 0.284 27 7.680 0.264 25 6.602 - - - 0.264 25 6.602 Subtotal: Recurring Cost - - - - - 0.000 - - 7.680 - - 6.602 - - - - - 6.602 AMC Deployable JWICS - - - - - 0.000 0.110 7 0.768 - - 0.000 - - - - - 0.000 ULI Systems - - - - - - 0.020 64 1.280 - - - - - - - - - Non Recurring Cost Subtotal: Non Recurring Cost - - - - - 0.000 - - 2.048 - - 0.000 - - - - - 0.000 Subtotal: Hardware - AF JWICS Enterprise Cost - - - - - 0.000 - - 9.728 - - 6.602 - - - - - 6.602 Gross/Weapon System Cost - - - - - 0.000 - - 9.728 - - 6.602 - - - - - 6.602 Remarks: Since this program was not slated to receive funding in FY 2026 and deployable intelligence communications equipment (DICE) kits have a six-to-eight-month manufacturing lead time, a portion of DICE kits were purchased in FY 2025 out of the Combat Air Intelligence Systems (CAIS) program. The DICE kits were prioritized in 2025 and some CAIS requirements were deferred to 2026. The portion of funds listed under ULI Systems funds Target Application Workstation systems, which are the main system used for basic intermediate, and advanced target development. It also funds Toolkit for Intelligence Targeting and Analysis mission systems that provide intelligence support to mission planning at flying units. LI 832070 - Intelligence Comm Equipment Air Force UNCLASSIFIED Page 28 of 28 P-1 Line #18 Volume 1 - 112 === page 149 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833010 / Air Traffic Control & Landing Sys Equip / BSA 3: Electronics Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 43.820 26.390 58.313 - 58.313 65.950 67.488 61.051 62.272 - - Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 43.820 26.390 58.313 - 58.313 65.950 67.488 61.051 62.272 - Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 43.820 26.390 58.313 - 58.313 65.950 67.488 61.051 62.272 - 385.284 385.284 385.284 - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - 1.304 1.350 0.326 1.676 1.386 1.072 0.689 0.703 - 6.830 Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Air Traffic Control and Landing Systems (ATCALS) centrally manages the Air Force's Air Traffic Control (ATC) capability to ensure ATC facilities/equipment can safely and expeditiously support enroute and terminal operations in benign and combat areas of responsibility. Major ATCALS systems include, but are not limited to, tactical radars, tactical and fixed-base navigation aids (NAVAIDS), instrument landing systems, and air-to-ground communication radios. These systems enable air traffic controllers to provide advisory, sequencing, separation, and landing guidance services to all aircraft in assigned airspace. ATCALS must also be inter-operable with systems operated by other services, the Federal Aviation Administration (FAA), or host nations. When possible, contracts with other services or the FAA are used. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. FY 2027 funding supports the programs below. 1. ATCALS FIXED BASE (FB) NAVIGATIONAL AIDS (NAVAIDS) Family of Systems (FOS): This FOS includes Tactical Navigation (TACAN), Very High Frequency (VHF) Omnidirectional Ranging (VOR) and combined VOR and TACAN (VORTAC) systems as well as a remote maintenance and monitoring (RMM) capability. A total 121 systems are in operation at Continental United Stated (CONUS) and Outside the CONUS (OCONUS) bases. These systems provide aircraft with point-to-point navigation and airfield landing approach guidance and are critical to mission success in adverse weather conditions and Global Positioning System (GPS) denied operations. FY 2027 FB NAVAID FOS effort replace analog VORTACs with Doppler VORTACs at four Air Education and Training Command (AETC) bases and upgrade of the remote maintenance monitoring system analog dial up infrastructure to digital capability and compliance with the 2023 Department of War (DoW) Chief Information Officer (CIO) mandated analog-to-digital conversion. The DVORs are needed as analog VORs at these locations no longer provide reliable radials due to encroachment (powerlines and buildings). This results in increased pilot training costs and throughput times as instrument training must be conducted at alternate bases. 2. FIXED BASE (FB) INSTRUMENT LANDING SYSTEM (ILS): FB-ILS consists of two subsystems which provide horizontal (localizer) and vertical (glide slope) guidance to enable aircraft to make an instrument precision approach to a runway in inclement weather. A total of seven FB-ILS systems will be procured. Six systems replace two end-of-life systems at Spangdahlem Air Base (AB) and four systems at Ramstein AB. One system will be installed on the new runway at Joint Reserve Base New Orleans. LI 833010 - Air Traffic Control & Landing Sys Air Force UNCLASSIFIED Page 1 of 39 P-1 Line #19 Volume 1 - 113 === page 150 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833010 / Air Traffic Control & Landing Sys Equip / BSA 3: Electronics Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A 3. MAN-PORTABLE (MP) TACTICAL AIR NAVIGATION (TACAN): The MP-TACAN provides aircraft with point-to-point navigating and instrument flight approaches to operating sites/landing zones and is critical to mission success in adverse weather conditions and Global Positioning System (GPS) denied operations. It replaces 1980s-era legacy systems which are no longer supportable. Five first article systems are on contract and in production. Full rate production will begin in FY 2027. A total of 76 systems will be procured (66 for the Active Duty and 10 for the Air National Guard). 4. EXPEDITIONARY SCALABLE MOBILE AIR TRAFFIC SYSTEM: This system includes a Multi-Capable Radar (MCR) with operator shelters and Control Towers (CT). These systems provide Africa Command (AFRICOM) a suite of capabilities including ATC radar surveillance, tactical command and control, Integrated Air and Missile Defense tracking and prediction, and counter small UAS detection. The system is cyber hardened, and Mode-5 (Identification Friend or Foe)/Mode-S (Surveillance) capable. The MCR shelter supports ATC controller positions and has available rack space for Ultra High Frequency (UHF)/Very High Frequency (VHF) radios and communication equipment. The system is transportable by vehicle or airlift (C-130, C-17, or CH-47). Three MCRs/CTs are being procured. 5. DEPLOYABLE RADAR APPROACH CONTROL SYSTEM (D-RAPCON)/LIGHTWEIGHT DEPLOYABLE GROUND CONTROLLED APPROACH (LD-GCA): This program refurbished two Army Air Traffic Navigation, Integration, and Coordination Systems (ATNAVICS). These systems provide terminal area, Air Traffic Control (ATC) radar surveillance and communications during adverse weather and night conditions. LD-GCA was a Middle Tier of Acquisition Rapid Fielding program completed in Sep 2025. Starting in FY 2026, the D-RAPCON program will be referred to as the "Air Traffic Navigation, Integration, and Coordination System (ATNAVICS)". ATNAVICS is now in sustainment and being supported in the Comm Electronic Modification Weapon System Code 838010. Note: The legacy (1970's-era) material solution for this requirement was a fleet of 7 AN/TPN-19 and 10 AN/MPN-14K mobile ATC systems. All of the AN/TPN-19 systems have been decommissioned. The 10 AN/MPN-14K systems will be decommissioned by FY 2028. The two ATNAVICS, along with the three U.S. Africa Command (AFRICOM) Expeditionary Scalable MCRs/ATC Operator Shelters will provide a limited capability until the Multi-Function Tactical Radar System (MTRS) and Tactical ATC Command and Control Operations System (TACOS) RDT&E development systems become available (IOC 2031/FOC 2035 timeframe). 6. National Airspace System (NAS) Air Traffic Control (ATC) Voice Recorder Replacement (VRR): The ATC VRR replaces end-of-life Digital Audio Legal Recorder (DALR) that is no longer supported by the original equipment manufacturer. Recording of ATC controller-to-pilot and ATC tower communications is required to support accident investigations, near misses, runway incursions, etc. Voice recorders are in all Air Force ATC towers/Radar Approach Control (RAPCON) facilities. Replacement recorders are being procured though a Federal Aviation Administration (FAA) fixed-price contract with production options through FY 2030. The FAA will also be the lead agency for Operational Safety, Suitability and Effectiveness (OSS&E) and lifecycle support. An estimated 160 ATC VRRs will be procured through FY 2024-2030. Funding for this exhibit is contained in PE 0305137F. Beginning in FY 2027, Budget Line Item 833020 is consolidated with the ATCALS Budget Line Item 833010. 7. NAS ATC Voice Switch Replacement: (NAS ATC VSR): The ATC VSR replaces the 25+ year old Enhanced Terminal Voice Switch (ETVS) systems which provide analog radio and telephone ATC voice communications. These legacy, analog systems are experiencing multiple support issues, diminishing manufacturing source constraints and do not meet the Department of War (DoW) Chief Information Officer (CIO) mandated transition to digital Internet Protocol (IP) capability. ATC controller-to-pilot communications are the heart of ATC capability and critical to safety of flight in the airfield terminal area. The FAA is also replacing the same legacy ETVS voice switches and have awarded contracts to two vendors. These contracts do not have options for the DoW. The Air Force is awarding contracts to the same FAA vendors to maintain system commonality and logistics support and ensure acquisition of systems certified by the FAA for use in the National Airspace System. Up to 150 production systems will be procured beginning in FY 2027. Funding for this exhibit is contained in PE 0305137F. Beginning in FY 2027, Budget Line Item 833020 is consolidated with the ATCALS Budget Line Item 833010. Funding increase due to consolidation of the NAS Budget Line Item (BLI) 833020 to the ATCALS BLI 833010. BLI 303020 added 29.548 million to the ATCALS BLI for the NAS ATC VSR and the NAS ATC VRR. Funds in this Budget Line Item (BLI) were included in a BLI consolidation for the FY27 PB. The exhibit includes funding from BLI, 833020. This BLI consolidation improves transparency, execution, and long term planning. Funding for this exhibit is contained in PE 0305114F and PE 0305137F. LI 833010 - Air Traffic Control & Landing Sys Air Force UNCLASSIFIED Page 2 of 39 P-1 Line #19 Volume 1 - 114 === page 151 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833010 / Air Traffic Control & Landing Sys Equip / BSA 3: Electronics Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Secondary Distribution AF Quantity Total Obligation Authority AFNG Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 833010 - Air Traffic Control & Landing Sys Air Force FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total 13 33 39 - 43.820 26.390 58.313 0.000 FY 2028 FY 2029 FY 2030 FY 2031 39 28 26 27 14 58.313 64.897 67.488 61.051 62.272 - - - - - - - - 0.000 0.000 0.000 - 0.000 1.053 0.000 - - 13 33 39 - 39 29 26 27 14 43.820 26.390 58.313 58.313 65.950 67.488 61.051 62.272 UNCLASSIFIED Page 3 of 39 0.000 1 P-1 Line #19 Volume 1 - 115 === page 152 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833010 / Air Traffic Control & Landing Sys Equip / BSA 3: Electronics Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 D-RAPCON/LD-GCA A - / - - P-5 Expeditionary Scalable Mobile Air Traffic System P-5a, P-21 A - / - 1 / 24.313 / 2.186 - P-5 FB NAVAIDs FOS TACAN/VORTAC P-5a, P-21 A - / - 12 / 11.869 P-5 Fixed Base Instrument Landing System P-5a, P-21 A - / - P-5 Man-Portable TACAN P-5a, P-21 A - / - P-5 NAS ATC Voice Recorder Replacement P-5a, P-21 A - / - - / - - / - - / 7.142 - / - - / 7.142 P-5 NAS ATC Voice Switch Replacement P-5a, P-21 A - / - - / - - / - - / 22.406 - / - - / 22.406 P-40 Total Gross/Weapon System Cost - / - / 26.390 - / 58.313 - / - - / 58.313 - - - / / 0.635 - / - - / - - / - / 0.650 - / 0.000 - / 0.650 14 / 11.084 13 / 7.371 14 / 11.084 - / 0.000 / - 7 / 6.614 12 / 4.719 - / 0.000 12 / 4.719 / 5.452 13 / 11.770 13 / 12.312 - / 0.000 13 / 12.312 / 43.820 - *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY27 Funds purchase doppler VHF Omni-directional Ranging (dVOR) systems, Man-Portable Tactical Navigation (MP-TACAN) systems, Fixed-Base Instrument Landing Systems, as well as maintenance monitoring equipment and program support costs for continued support to the delivery and installation of previously purchased ATCALS. 1. ATCALS FIXED BASE (FB) NAVIGATIONAL AIDS (NAVAIDS) FAMILY OF SYSTEMS (FOS): FY 2027 funds procure, prepare site, and install 2 dVOR system, 12 remote maintenance and monitoring systems and fund Program Support Costs. 2. FIXED BASE INSTRUMENT LANDING SYSTEM (FB-ILS): FY 2027 funds procure 12 FB-ILS shelters. 3. MAN-PORTABLE (MP) TACAN (TACAN): FY 2027 funds procure 13 MP-TACANs and fund Program Support Costs. 4. DEPLOYABLE RADAR APPROACH CONTROL (D-RAPCON)/LIGHTWEIGHT DEPLOYABLE GROUND CONTROLLED APPROACH (LD-GCA): No budget year FY 2027 funds are requested. 5. EXPEDITIONARY SCALABLE MOBILE AIR TRAFFIC SYSTEM: FY 2027 funds Program Support Costs. 6. NATIONAL AIRSPACE SYSTEM (NAS) AIR TRAFFIC CONTROL (ATC) VOICE RECORDER REPLACEMENT (VRR): FY 2027 funds procure 25 VRRs, and fund program support costs. 7. NAS ATC VOICE SWITCH REPLACEMENT (VSR): FY 2027 funds procure 14 VSRs and fund program support costs. Note: FY 2026 PB request included procurement of two Fixed Base Instrument Landing Systems (FB-ILS) and one doppler Very High Frequency Omni-Directional Range (DVOR) each year in FY 2026 through FY 2029. The FY 2027 PB request procures seven FB-ILSs in FY 2026, 12 FB-ILS shelters and two DVORs in FY 2027. This realignment was necessary as the FB-ILS vendor production line ends in FY 2026. The total required number of FB-ILSs was also reduced from eight systems to seven. LI 833010 - Air Traffic Control & Landing Sys Air Force UNCLASSIFIED Page 4 of 39 P-1 Line #19 Volume 1 - 116 === page 153 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: D-RAPCON/LD-GCA MDAP/MAIS Code: FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - - Gross/Weapon System Cost ($ in Millions) - 2.186 - - - - Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 2.186 - - - - Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 2.186 - - - - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Support - D-RAPCON Cost Direct Mission Support - - - - - 0.332 - - - - - - - - - - - - Program Support Cost - - - - - 0.347 - - - - - - - - - - - - Interim Contractor Support - - - - - 1.507 - - - - - - - - - - - - Subtotal: Support - DRAPCON Cost - - - - - 2.186 - - - - - - - - - - - - Gross/Weapon System Cost - - - - - 2.186 - - - - - - - - - - - - Secondary Distribution AF Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 833010 - Air Traffic Control & Landing Sys Air Force FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total - - - - - 2.186 - - - - - - - - - 2.186 - - - - UNCLASSIFIED Page 5 of 39 P-1 Line #19 Volume 1 - 117 === page 154 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Expeditionary Scalable Mobile Air Traffic System MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC - - - FY 2027 Total - 0.635 0.650 0.000 0.650 Procurement Quantity (Units in Each) - 1 Gross/Weapon System Cost ($ in Millions) - 24.313 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 24.313 0.635 0.650 0.000 0.650 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 24.313 0.635 0.650 0.000 0.650 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - 24.313 - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Expeditionary Scalable Mobile Air Traffic System - MCR Cost Recurring Cost Multi-Capable Radar - - - 19.152 Subtotal: Recurring Cost - - - - Subtotal: Hardware Expeditionary Scalable Mobile Air Traffic System MCR Cost - - - (MCR) (†) 1 19.152 - - - - - - - - - - - - - 19.152 - - - - - - - - - - - - - - 19.152 - - - - - - - - - - - - Logistics - Expeditionary Scalable Mobile Air Traffic System Cost Non Recurring Cost GFE - - - - - 2.348 - - - - - - - - - - - - Program Support Costs - - - - - 2.813 - - 0.635 - - 0.650 - - 0.000 - - 0.650 Subtotal: Non Recurring Cost - - - - - 5.161 - - 0.635 - - 0.650 - - 0.000 - - 0.650 Subtotal: Logistics Expeditionary Scalable Mobile Air Traffic System Cost - - - - - 5.161 - - 0.635 - - 0.650 - - 0.000 - - 0.650 Gross/Weapon System Cost - - - 24.313 24.313 - - 0.635 - - 0.650 - - 0.000 - - 0.650 LI 833010 - Air Traffic Control & Landing Sys Air Force 1 UNCLASSIFIED Page 6 of 39 P-1 Line #19 Volume 1 - 118 === page 155 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys ID Code (A=Service Ready, B=Not Service Ready) : A Secondary Distribution AF Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority Item Number / Title [DODIC]: Expeditionary Scalable Mobile Air Traffic System MDAP/MAIS Code: FY 2025 FY 2027 Base FY 2026 1 24.313 1 24.313 FY 2027 OOC FY 2027 Total - - - - 0.635 0.650 0.000 0.650 - - - - 0.635 0.650 0.000 0.650 indicates the presence of a P-5a LI 833010 - Air Traffic Control & Landing Sys Air Force UNCLASSIFIED Page 7 of 39 P-1 Line #19 Volume 1 - 119 === page 156 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 O O C Cost Elements (†) Multi-Capable Radar (MCR) (†) P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys FY Contractor and Location Method/Type or Funding Vehicle 2025 SAAB United States / Washington, DC C / FFP Item Number / Title [DODIC]: Expeditionary Scalable Mobile Air Traffic System Location of PCO Award Date Date of First Delivery AFRICOM Jun 2025 Jul 2027 Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) 1 19.152 RFP Issue Date Y indicates the presence of a P-21 Remarks: Hardware contracts will be awarded under the BAE Instrumentation Range Support Program (IRSP) contract. This (BAE) contract is an Indefinite Delivery Indefinite Quantity (IDIQ) contract. Contract award and delivery dates reported on FY24PB P-DOC reflect the date of the MIPR to BAE and execution through the IRSP contract. Revised dates reported here, reflect anticipated contract award and delivery dates to the hardware vendors for the mobile tower and mobile Air Traffic Control (ATC) surveillance radar. LI 833010 - Air Traffic Control & Landing Sys Air Force UNCLASSIFIED Page 8 of 39 P-1 Line #19 Volume 1 - 120 === page 157 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Expeditionary Scalable Mobile Air Traffic System Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT B A L A N C E Fiscal Year 2026 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R M A Y O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Multi-Capable Radar (MCR) 1 2025 AF 1 0 1 A - LI 833010 - Air Traffic Control & Landing Sys Air Force J U N J U L A U G UNCLASSIFIED Page 9 of 39 S E P O C T N O V D E C J A N F E B P-1 Line #19 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 121 1 === page 158 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Expeditionary Scalable Mobile Air Traffic System Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Multi-Capable Radar (MCR) 1 2025 AF 1 0 1 O C T N O V LI 833010 - Air Traffic Control & Landing Sys Air Force D E C J A N F E B M A R A P R M A Y J U N 1 J U L 0 UNCLASSIFIED Page 10 of 39 P-1 Line #19 Volume 1 - 122 === page 159 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: Expeditionary Scalable Mobile Air Traffic System Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 SAAB United States Washington, DC MSR For 2027 1-8-5 For 2027 MAX For 2027 1 3 3 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 2 Manufacturing PLT 9 Total After Oct 1 25 34 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 833010 - Air Traffic Control & Landing Sys Air Force UNCLASSIFIED Page 11 of 39 P-1 Line #19 Volume 1 - 123 === page 160 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: FB NAVAIDs FOS TACAN/VORTAC MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) - 12 13 14 - Gross/Weapon System Cost ($ in Millions) - 11.869 7.371 11.084 14 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 11.869 7.371 11.084 0.000 11.084 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 11.869 7.371 11.084 0.000 11.084 0.000 11.084 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - 0.370 0.380 - 0.380 Gross/Weapon System Unit Cost ($ in Millions) - 0.989 0.567 0.792 - 0.792 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - FB NAVAIDs FOS TACAN/VORTAC Cost Non Recurring Cost Remote Maintenance and Monitoring Equipment/ - - - 0.545 12 6.537 0.558 12 6.700 0.525 12 6.300 - - 0.000 0.525 12 6.300 - - - - - - - - 0.000 1.950 2 3.900 - - 0.000 1.950 2 3.900 - - - - - 6.537 - - 6.700 - - 10.200 - - 0.000 - - 10.200 - - - - - 6.537 - - 6.700 - - 10.200 - - 0.000 - - 10.200 (†) Installation Doppler-VOR (D(†) VOR) Subtotal: Non Recurring Cost Subtotal: Hardware - FB NAVAIDs FOS TACAN/ VORTAC Cost Support - FB NAVAIDs FOS TACAN/VORTAC Cost RMM - Program Support Costs - - - - - 0.816 - - 0.671 - - 0.378 - - 0.000 - - 0.378 dVOR - Program Support Costs - - - - - - - - 0.000 - - 0.506 - - 0.000 - - 0.506 dVOR - Depot Stand Up - - - - - - - - - - - 0.000 - - 0.000 - - 0.000 FB-TACAN Windows 11 Upgrade - - - - - 1.556 - - - - - - - - - - - - RMM - Cyber Security Service Provider - - - - - 0.600 - - - - - - - - - - - - RMM - Depot Stand Up - - - - - 2.360 - - - - - - - - - - - - LI 833010 - Air Traffic Control & Landing Sys Air Force UNCLASSIFIED Page 12 of 39 P-1 Line #19 Volume 1 - 124 === page 161 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: FB NAVAIDs FOS TACAN/VORTAC MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) ($ M) Unit Cost ($ M) Total Cost Qty (Each) ($ M) Subtotal: Support - FB NAVAIDs FOS TACAN/ VORTAC Cost - - - - - 5.332 - - 0.671 - - 0.884 - - 0.000 - - 0.884 Gross/Weapon System Cost - - - 0.989 12 11.869 0.567 13 7.371 0.792 14 11.084 - - 0.000 0.792 14 11.084 Remarks: FY26 increase due to initial procurement of 4 doppler VOR systems. Secondary Distribution AF Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC 12 13 14 11.869 7.371 11.084 12 13 14 11.869 7.371 11.084 FY 2027 Total 0.000 0.000 14 11.084 14 11.084 indicates the presence of a P-5a LI 833010 - Air Traffic Control & Landing Sys Air Force UNCLASSIFIED Page 13 of 39 P-1 Line #19 Volume 1 - 125 === page 162 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 O O C FY Contractor and Location (†) 2025 555th SWES / Tinker AFB, OK PO AFLCMC Tinker AFB Jan 2025 Jul 2025 12 0.545 Y (†) 2026 555th SWES / Tinker AFB, OK PO AFLCMC Tinker AFB Jan 2026 Jul 2026 12 0.558 Y (†) 2027 555th SWES / Tinker AFB, OK PO AFLCMC Tinker AFB Jan 2027 Jul 2027 12 0.525 Y 2027 Thales / Overland Park, KS SS / FFP AFLCMC Tinker AFB Jan 2027 Apr 2027 2 1.950 Y Monitoring Equipment/Installation Remote Maintenance and Monitoring Equipment/Installation Remote Maintenance and Monitoring Equipment/Installation Doppler-VOR (D-VOR) (†) (†) Item Number / Title [DODIC]: FB NAVAIDs FOS TACAN/VORTAC Method/Type or Funding Vehicle Cost Elements Remote Maintenance and P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date Oct 2024 indicates the presence of a P-21 LI 833010 - Air Traffic Control & Landing Sys Air Force UNCLASSIFIED Page 14 of 39 P-1 Line #19 Volume 1 - 126 === page 163 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: FB NAVAIDs FOS TACAN/VORTAC Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Remote Maintenance and Monitoring Equipment/Installation 1 2025 AF 12 0 12 1 2026 AF 12 0 12 1 2027 AF 12 0 12 2 0 2 A - - - - - - 1 1 1 1 1 1 1 1 A - 1 - 1 - 1 - 1 - 0 - 1 1 1 9 12 Doppler-VOR (D-VOR) 2 2027 AF 2 O C T N O V LI 833010 - Air Traffic Control & Landing Sys Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 39 S E P O C T N O V D E C J A N F E B P-1 Line #19 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 127 === page 164 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: FB NAVAIDs FOS TACAN/VORTAC Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Remote Maintenance and Monitoring Equipment/Installation 1 2025 AF 12 12 0 1 2026 AF 12 3 9 1 2027 AF 12 0 12 2 0 2 0 1 1 1 1 1 A - 1 - 1 - 1 - 1 - 0 - 1 1 1 1 1 1 1 1 1 1 1 1 0 Doppler-VOR (D-VOR) 2 2027 AF A O C T N O V LI 833010 - Air Traffic Control & Landing Sys Air Force D E C J A N F E B M A R 1 A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 39 1 S E P 0 O C T N O V D E C J A N F E B P-1 Line #19 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 128 === page 165 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: FB NAVAIDs FOS TACAN/VORTAC Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 555th SWES - Tinker AFB, OK 1 16 20 0 0 0 0 1 4 6 10 2 Thales - Overland Park, KS 1 2 3 1 4 3 7 0 4 3 7 Remarks: MSR is one system per year. Only one VDATS funded (FY23 - delivered in FY24). "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 833010 - Air Traffic Control & Landing Sys Air Force UNCLASSIFIED Page 17 of 39 P-1 Line #19 Volume 1 - 129 === page 166 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Fixed Base Instrument Landing System MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) - - 7 12 - 12 Gross/Weapon System Cost ($ in Millions) - - 6.614 4.719 0.000 4.719 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - 6.614 4.719 0.000 4.719 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - 6.614 4.719 0.000 4.719 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - 0.311 0.319 0.326 0.645 Gross/Weapon System Unit Cost ($ in Millions) - - 0.945 0.393 - 0.393 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Fixed Base ILS Cost Recurring Cost Fixed Base ILS - - - - - - 0.875 (†) - - - - - - - Subtotal: Recurring Cost - - - - - - Subtotal: Hardware - Fixed Base ILS Cost - - - - - Direct Mission Support - - - - Program Support Cost - - - - Subtotal: Support - Fixed Base ILS Cost - - - Gross/Weapon System Cost - - - Electronics System (†) Fixed Base ILS Shelter 7 6.125 - - - - - 0.000 - - 0.000 - 0.000 0.350 12 4.200 - - - 0.350 12 4.200 - - 6.125 - - 4.200 - - 0.000 - - 4.200 - - - 6.125 - - 4.200 - - 0.000 - - 4.200 - - - - 0.202 - - 0.280 - - 0.000 - - 0.280 - - - - 0.287 - - 0.239 - - 0.000 - - 0.239 - - - - - 0.489 - - 0.519 - - 0.000 - - 0.519 - - - 0.945 6.614 0.393 12 4.719 - - 0.000 0.393 12 4.719 Support - Fixed Base ILS Cost Secondary Distribution AF Total: 7 FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total Quantity - 7 12 - 12 Total Obligation Authority - 6.614 4.719 0.000 4.719 Quantity - 7 12 - 12 LI 833010 - Air Traffic Control & Landing Sys Air Force UNCLASSIFIED Page 18 of 39 P-1 Line #19 Volume 1 - 130 === page 167 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys ID Code (A=Service Ready, B=Not Service Ready) : A Secondary Distribution Secondary Distribution (†) Total Obligation Authority Item Number / Title [DODIC]: Fixed Base Instrument Landing System MDAP/MAIS Code: FY 2025 FY 2027 Base FY 2026 - 6.614 FY 2027 OOC 4.719 FY 2027 Total 0.000 4.719 indicates the presence of a P-5a LI 833010 - Air Traffic Control & Landing Sys Air Force UNCLASSIFIED Page 19 of 39 P-1 Line #19 Volume 1 - 131 === page 168 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements Fixed Base ILS Electronics System (†) Fixed Base ILS Shelter (†) (†) O O C P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Item Number / Title [DODIC]: Fixed Base Instrument Landing System FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) 2026 Indra / Overland Park, KS MIPR NAVAIR Jun 2026 Jan 2027 7 0.875 Y 2027 TBD / TBD C / FFP TBD Jan 2027 Jun 2027 12 0.350 Y Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 833010 - Air Traffic Control & Landing Sys Air Force UNCLASSIFIED Page 20 of 39 P-1 Line #19 Volume 1 - 132 === page 169 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Fixed Base Instrument Landing System Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Fixed Base ILS Electronics System 1 2026 AF 7 0 7 12 0 12 A - - - - - - - 1 1 1 1 1 1 1 0 Fixed Base ILS Shelter 2 2027 AF A O C T N O V LI 833010 - Air Traffic Control & Landing Sys Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 21 of 39 S E P O C T N O V D E C J A N F E B P-1 Line #19 M A R A P R M A Y 1 J U N 1 J U L 1 A U G 1 S E P Volume 1 - 133 8 === page 170 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Fixed Base Instrument Landing System Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Fixed Base ILS Electronics System 1 2026 AF 7 7 0 12 4 8 0 Fixed Base ILS Shelter 2 2027 AF 1 O C T 1 N O V LI 833010 - Air Traffic Control & Landing Sys Air Force 2 D E C 2 J A N 2 F E B 0 M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 22 of 39 S E P O C T N O V D E C J A N F E B P-1 Line #19 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 134 === page 171 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: Fixed Base Instrument Landing System Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Indra - Overland Park, KS 2 4 12 3 9 7 16 0 0 0 0 2 TBD - TBD 2 4 12 3 4 5 9 0 0 0 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 833010 - Air Traffic Control & Landing Sys Air Force UNCLASSIFIED Page 23 of 39 P-1 Line #19 Volume 1 - 135 === page 172 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Man-Portable TACAN MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC 13 13 11.770 12.312 FY 2027 Total Procurement Quantity (Units in Each) - - - Gross/Weapon System Cost ($ in Millions) - 5.452 13 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 5.452 11.770 12.312 0.000 12.312 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 5.452 11.770 12.312 0.000 12.312 0.000 12.312 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - 0.623 0.651 - 0.651 Gross/Weapon System Unit Cost ($ in Millions) - - 0.905 0.947 - 0.947 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Manportable TACAN Cost Recurring Cost (†) - - - - - - 0.801 13 10.408 0.848 13 11.023 - - 0.000 0.848 13 11.023 - - - - - - - - 10.408 - - 11.023 - - 0.000 - - 11.023 - - - - - - - - 10.408 - - 11.023 - - 0.000 - - 11.023 Program Support Cost - - - - - 1.694 - - 0.860 - - 0.900 - - 0.000 - - 0.900 Direct Mission Support - - - - - 0.250 - - - - - - - - - - - - Readiness Support Kits - - - - - - - - - - - 0.389 - - 0.000 - - 0.389 Technical Data and Training Material - - - - - - - - 0.502 - - - - - - - - - MP-TACAN First Article Testing/E-Scan Antenna Integration - - - - - 3.508 - - - - - - - - - - - - Subtotal: Support Manportable TACAN Cost - - - - - 5.452 - - 1.362 - - 1.289 - - 0.000 - - 1.289 Gross/Weapon System Cost - - - - - 5.452 0.905 13 11.770 0.947 13 12.312 - - 0.000 0.947 13 12.312 MP-TACAN Subtotal: Recurring Cost Subtotal: Hardware Manportable TACAN Cost Support - Manportable TACAN Cost Remarks: FY26 funding increase for technical data and training materials. LI 833010 - Air Traffic Control & Landing Sys Air Force UNCLASSIFIED Page 24 of 39 P-1 Line #19 Volume 1 - 136 === page 173 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys ID Code (A=Service Ready, B=Not Service Ready) : A Secondary Distribution AF Quantity Total Obligation Authority AFNG Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority Item Number / Title [DODIC]: Man-Portable TACAN MDAP/MAIS Code: FY 2025 FY 2027 Base FY 2026 5.452 FY 2027 OOC FY 2027 Total 13 13 11.770 12.312 0.000 - 13 12.312 - - - - - 0.000 0.000 0.000 - 0.000 5.452 13 13 11.770 12.312 0.000 13 12.312 indicates the presence of a P-5a LI 833010 - Air Traffic Control & Landing Sys Air Force UNCLASSIFIED Page 25 of 39 P-1 Line #19 Volume 1 - 137 === page 174 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (†) MP-TACAN (†) MP-TACAN (†) O O C P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Method/Type or Funding Vehicle Item Number / Title [DODIC]: Man-Portable TACAN Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty FY Contractor and Location 2026 Indra Air Traffic, Inc / Overland Park, KS C / FFP AFLCMC Tinker AFB Jun 2026 Jan 2027 13 0.801 Y 2027 Indra Air Traffic, Inc / Overland Park, KS C / FFP AFLCMC Tinker AFB Jun 2027 Jan 2028 13 0.848 Y (Each) RFP Issue Date indicates the presence of a P-21 LI 833010 - Air Traffic Control & Landing Sys Air Force UNCLASSIFIED Page 26 of 39 P-1 Line #19 Volume 1 - 138 === page 175 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Man-Portable TACAN Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P MP-TACAN 1 2026 AF 13 0 13 1 2027 AF 13 0 13 A - - - - - - - 1 1 1 1 1 1 1 A O C T N O V LI 833010 - Air Traffic Control & Landing Sys Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 27 of 39 S E P O C T N O V D E C J A N F E B P-1 Line #19 M A R A P R M A Y J U N 1 J U L 1 A U G - 4 13 S E P Volume 1 - 139 === page 176 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Man-Portable TACAN Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E MP-TACAN 1 2026 AF 13 9 4 1 2027 AF 13 0 13 1 1 O C T 2 N O V LI 833010 - Air Traffic Control & Landing Sys Air Force 0 D E C 1 J A N 1 F E B 1 M A R 1 A P R 1 M A Y 1 J U N 1 J U L 1 A U G UNCLASSIFIED Page 28 of 39 1 S E P 1 O C T 1 N O V 2 D E C 0 J A N F E B P-1 Line #19 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 140 === page 177 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: Man-Portable TACAN Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Indra Air Traffic, Inc Overland Park, KS MSR For 2027 1-8-5 For 2027 MAX For 2027 5 12 60 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 3 Manufacturing PLT 9 Total After Oct 1 7 16 Remarks: Break in production from Aug 25 to Jun 26 is due to time required for first article testing and approval prior to full rate production. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 833010 - Air Traffic Control & Landing Sys Air Force UNCLASSIFIED Page 29 of 39 P-1 Line #19 Volume 1 - 141 === page 178 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: NAS ATC Voice Recorder Replacement MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - - 7.142 - 7.142 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - - 7.142 - 7.142 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - - 7.142 - 7.142 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - NAS ATC Voice Recorder Replacement Cost Recurring Cost Voice Recorder Equipment Costs (†) Subtotal: Recurring Cost Subtotal: Hardware NAS ATC Voice Recorder Replacement Cost - - - - - - - - - 0.233 25 5.825 - - - 0.233 25 5.825 - - - - - - - - - - - 5.825 - - - - - 5.825 - - - - - - - - - - - 5.825 - - - - - 5.825 Support - NAS ATC Voice Recorder Replacement Cost Program support Costs (PSC) - - - - - - - - - - - 0.751 - - - - - 0.751 Direct Mission Support - - - - - - - - - - - 0.566 - - - - - 0.566 Subtotal: Support - NAS ATC Voice Recorder Replacement Cost - - - - - - - - - - - 1.317 - - - - - 1.317 Gross/Weapon System Cost - - - - - - - - - - - 7.142 - - - - - 7.142 Secondary Distribution AF Total: FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total Quantity - - - - - Total Obligation Authority - - 7.142 - 7.142 Quantity - - - - - LI 833010 - Air Traffic Control & Landing Sys Air Force UNCLASSIFIED Page 30 of 39 P-1 Line #19 Volume 1 - 142 === page 179 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys ID Code (A=Service Ready, B=Not Service Ready) : A Secondary Distribution Secondary Distribution (†) Total Obligation Authority Item Number / Title [DODIC]: NAS ATC Voice Recorder Replacement MDAP/MAIS Code: FY 2025 FY 2027 Base FY 2026 - - FY 2027 OOC 7.142 FY 2027 Total - 7.142 indicates the presence of a P-5a LI 833010 - Air Traffic Control & Landing Sys Air Force UNCLASSIFIED Page 31 of 39 P-1 Line #19 Volume 1 - 143 === page 180 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 O O C Cost Elements (†) Voice Recorder Equipment Costs (†) P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys FY Contractor and Location Method/Type or Funding Vehicle 2027 Nice Sys Inc / Hoboken, NJ C / FFP Item Number / Title [DODIC]: NAS ATC Voice Recorder Replacement Location of PCO Award Date Date of First Delivery AFLCMC Tinker AFB Jan 2027 May 2027 Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) 25 0.233 RFP Issue Date Y indicates the presence of a P-21 LI 833010 - Air Traffic Control & Landing Sys Air Force UNCLASSIFIED Page 32 of 39 P-1 Line #19 Volume 1 - 144 === page 181 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: NAS ATC Voice Recorder Replacement Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P M A Y J U N J U L A U G S E P B A L A N C E Voice Recorder Equipment Costs 1 2027 AF (1) 25 0 25 A - LI 833010 - Air Traffic Control & Landing Sys Air Force J A N F E B M A R A P R 3 M A Y 2 J U N 2 J U L 2 A U G UNCLASSIFIED Page 33 of 39 2 S E P 2 O C T 2 N O V 2 D E C 2 J A N 2 F E B P-1 Line #19 2 M A R 2 A P R 0 Volume 1 - 145 === page 182 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: NAS ATC Voice Recorder Replacement Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Nice Sys Inc - Hoboken, NJ MSR For 2027 1-8-5 For 2027 MAX For 2027 12 24 32 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 3 Manufacturing PLT 4 Total After Oct 1 4 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (1) Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. LI 833010 - Air Traffic Control & Landing Sys Air Force UNCLASSIFIED Page 34 of 39 P-1 Line #19 Volume 1 - 146 8 === page 183 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: NAS ATC Voice Switch Replacement MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - - 22.406 - 22.406 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - - 22.406 - 22.406 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - - 22.406 - 22.406 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - NAS ATC Voice Switch System Replacement Cost Recurring Cost Fixed-Base Voice Switch (†) Subtotal: Recurring Cost Subtotal: Hardware - NAS ATC Voice Switch System Replacement Cost - - - - - - - - - 1.370 14 19.176 - - - 1.370 14 19.176 - - - - - - - - - - - 19.176 - - - - - 19.176 - - - - - - - - - - - 19.176 - - - - - 19.176 Support - NAS ATC Voice Switch Replacement Cost Direct Mission Support (DMS) - - - - - - - - - - - 0.910 - - - - - 0.910 DoD Requirements Design/Integration, Testing, ECPs, Tech Orders - - - - - - - - - - - 1.043 - - - - - 1.043 Program Support Costs (PSC) - - - - - - - - - - - 1.277 - - - - - 1.277 Subtotal: Support NAS ATC Voice Switch Replacement Cost - - - - - - - - - - - 3.230 - - - - - 3.230 Gross/Weapon System Cost - - - - - - - - - - - 22.406 - - - - - 22.406 LI 833010 - Air Traffic Control & Landing Sys Air Force UNCLASSIFIED Page 35 of 39 P-1 Line #19 Volume 1 - 147 === page 184 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys ID Code (A=Service Ready, B=Not Service Ready) : A Secondary Distribution AF Total: Secondary Distribution (†) Item Number / Title [DODIC]: NAS ATC Voice Switch Replacement MDAP/MAIS Code: FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total Quantity - - - - - Total Obligation Authority - - 22.406 - 22.406 Quantity - - - - - Total Obligation Authority - - 22.406 - 22.406 indicates the presence of a P-5a LI 833010 - Air Traffic Control & Landing Sys Air Force UNCLASSIFIED Page 36 of 39 P-1 Line #19 Volume 1 - 148 === page 185 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (†) Fixed-Base Voice Switch (†) O O C P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys FY Contractor and Location Method/Type or Funding Vehicle 2027 TBD / TBD TBD Item Number / Title [DODIC]: NAS ATC Voice Switch Replacement Location of PCO Award Date Date of First Delivery AFLCMC Tinker AFB Mar 2027 Jul 2027 Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) 14 1.370 RFP Issue Date Y indicates the presence of a P-21 Remarks: The Voice Switch Replacement will be awarded on a sole-source contract to two vendors supplying the FAA contract. This selection ensures configuration control and interoperability within the National Airspace System. LI 833010 - Air Traffic Control & Landing Sys Air Force UNCLASSIFIED Page 37 of 39 P-1 Line #19 Volume 1 - 149 === page 186 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: NAS ATC Voice Switch Replacement Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P J U L A U G S E P B A L A N C E Fixed-Base Voice Switch 1 2027 AF 14 0 14 A - LI 833010 - Air Traffic Control & Landing Sys Air Force M A R A P R M A Y J U N 1 J U L 1 A U G UNCLASSIFIED Page 38 of 39 1 S E P 1 O C T 1 N O V 1 D E C 1 J A N 1 F E B P-1 Line #19 1 M A R 1 A P R 2 M A Y 2 J U N 0 Volume 1 - 150 === page 187 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833010 / Air Traffic Control & Landing Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: NAS ATC Voice Switch Replacement Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 TBD - TBD MSR For 2027 1-8-5 For 2027 MAX For 2027 12 24 34 ALT Prior to Oct 1 ALT After Oct 1 1 Reorder Manufacturing PLT 6 4 Total After Oct 1 ALT Prior to Oct 1 10 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 833010 - Air Traffic Control & Landing Sys Air Force UNCLASSIFIED Page 39 of 39 P-1 Line #19 Volume 1 - 151 0 === page 188 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 152 === page 189 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833020 / National Airspace System Equip / BSA 3: Electronics Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 13.443 11.810 0.000 - 0.000 0.000 0.000 0.000 0.000 - 25.253 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 13.443 11.810 0.000 - 0.000 0.000 0.000 0.000 0.000 - 25.253 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 13.443 11.810 0.000 - 0.000 0.000 0.000 0.000 0.000 - 25.253 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.380 0.750 - - - - - - - - 1.130 Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: PE 0305137F NATIONAL AIRSPACE SYSTEM (NAS) The NAS program modernizes and sustains the Department of War (DoW) Air Traffic Control (ATC) system in concert with the Federal Aviation Administration (FAA). NAS increases safety of flight, provides systems and facilities interoperable with FAA, replaces aging DoW ATC systems, provides identical service to military and civilian aircraft, and reduces DoW flight cancellations/delays and maintenance. NAS includes two programs: the ATC Voice Recorder Replacement (VRR) and the ATC Voice Switch Replacement (VSR). The ATC VRR replaces end-of-life Digital Audio Legal Recorder (DALR) that is no longer supported by the original equipment manufacturer. Recording of ATC controller-to-pilot and ATC tower communications is required to support accident investigations, near misses, runway incursions, etc. VRRs are in all Air Force ATC towers/Radar Approach Control (RAPCON) facilities. Replacement recorders are being procured though a Federal Aviation Administration (FAA) fixed-price contract with production options through FY 2030. The FAA will also be the lead agency for Operational Safety, Suitability and Effectiveness (OSS&E) and lifecycle support. An estimated 160 ATC VRRs will be procured through FY 2024-2030. The ATC VSR replaces the 25+ year old Enhanced Terminal Voice Switch (ETVS) systems which provide analog radio and telephone voice communications for ATC voice communications. These legacy, analog systems are experiencing multiple support issues and part constraints and do not meet the Department of War (DoW) Chief Information Officer (CIO) mandated transition to digital Internet Protocol (IP) capability. ATC controller-to-pilot communications are the heart of ATC capability and critical to safety of flight in the airfield terminal area. The FAA is also replacing ETVS voice switches and has awarded two contracts under their Brand New Air Traffic Control System program. These contracts to not include options for DoW. To ensure commonality and logistics support with the FAA, the Air Force will procure FAA certified ETVS replacement systems with the FAA vendors on separate contracts. A total of 150 VSRs are required. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), these items are necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. Funding for this exhibit is contained in Program Element (PE) 0305137FRRs LI 833020 - National Airspace System Air Force UNCLASSIFIED Page 1 of 10 P-1 Line #20 Volume 1 - 153 === page 190 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833020 / National Airspace System Equip / BSA 3: Electronics Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Secondary Distribution AF Quantity Total Obligation Authority AFNG AFR FY 2027 Base FY 2026 24 19 12.579 10.034 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - 0.000 - 0.000 0.000 0.000 0.000 0.000 Quantity - 4 - - - - - - - Total Obligation Authority - 1.332 - - - 0.000 0.000 0.000 - 1 2 - - - - - - - 0.864 0.444 - - - 0.000 0.000 0.000 - 25 25 - - - - - - - 13.443 11.810 0.000 - 0.000 0.000 0.000 0.000 0.000 Quantity Total Obligation Authority Total: Secondary Distribution FY 2025 Quantity Total Obligation Authority LI 833020 - National Airspace System Air Force UNCLASSIFIED Page 2 of 10 P-1 Line #20 Volume 1 - 154 === page 191 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833020 / National Airspace System Equip / BSA 3: Electronics Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 NAS ATC Voice Recorder Replacement P-5 NAS ATC Voice Switch Replacement P-40 Total Gross/Weapon System Cost MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Subexhibits ID CD P-5a, P-21 A - / - 25 / 6.662 25 / 6.787 - / 0.000 - / - - / 0.000 A - / - - / 6.781 - / 5.023 - / 0.000 - / - - / 0.000 - / - - / 13.443 - / 11.810 - / 0.000 - / - - / 0.000 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: NAS ATC Voice Recorder Replacement (VRR): No FY 2027 funds requested. The NAS 833020 Budget Line Item was consolidated with the Air Traffic Control Landing System (ATCALS) 833010 Budget Line Item starting in FY 2027. ATC Voice Switch Replacement (VSR): No FY 2027 funds requested. The NAS 833020 Budget Line Item was consolidated with the Air Traffic Control Landing System (ATCALS) 833010 Budget Line Item starting in FY 2027. LI 833020 - National Airspace System Air Force UNCLASSIFIED Page 3 of 10 P-1 Line #20 Volume 1 - 155 === page 192 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 833020 / National Airspace System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: NAS ATC Voice Recorder Replacement MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 25 FY 2026 25 - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 6.662 6.787 0.000 - 0.000 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 6.662 6.787 0.000 - 0.000 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 6.662 6.787 0.000 - 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.380 0.390 - - - Gross/Weapon System Unit Cost ($ in Millions) - 0.266 0.271 - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - NAS ATC Voice Recorder Replacement Cost Recurring Cost Voice Recorder Equipment Costs (†) Subtotal: Recurring Cost Subtotal: Hardware NAS ATC Voice Recorder Replacement Cost - - - 0.216 25 5.409 0.222 25 5.552 - - 0.000 - - - - - 0.000 - - - - - 5.409 - - 5.552 - - 0.000 - - - - - 0.000 - - - - - 5.409 - - 5.552 - - 0.000 - - - - - 0.000 Support - NAS ATC Voice Recorder Replacement Cost Program Support Costs (PSC) - - - - - 0.754 - - 0.720 - - 0.000 - - - - - 0.000 Direct Mission Support - - - - - 0.499 - - 0.515 - - 0.000 - - - - - 0.000 Subtotal: Support - NAS ATC Voice Recorder Replacement Cost - - - - - 1.253 - - 1.235 - - 0.000 - - - - - 0.000 Gross/Weapon System Cost - - - 0.266 25 6.662 0.271 25 6.787 - - 0.000 - - - - - 0.000 Secondary Distribution AF Quantity Total Obligation Authority AFNG FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total 24 19 - - - 5.798 5.011 0.000 - 0.000 Quantity - 4 - - - Total Obligation Authority - 1.332 - - - LI 833020 - National Airspace System Air Force UNCLASSIFIED Page 4 of 10 P-1 Line #20 Volume 1 - 156 === page 193 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 P-1 Line Item Number / Title: 833020 / National Airspace System ID Code (A=Service Ready, B=Not Service Ready) : A Secondary Distribution AFR Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority Item Number / Title [DODIC]: NAS ATC Voice Recorder Replacement MDAP/MAIS Code: FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total 1 2 - - - 0.864 0.444 - - - 25 25 - - - 6.662 6.787 0.000 - 0.000 indicates the presence of a P-5a LI 833020 - National Airspace System Air Force UNCLASSIFIED Page 5 of 10 P-1 Line #20 Volume 1 - 157 === page 194 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 O O C Item Number / Title [DODIC]: NAS ATC Voice Recorder Replacement FY Contractor and Location Method/Type or Funding Vehicle (†) 2025 Nice Sys Inc / Hoboken, NJ C / FFP AFLCMC Tinker AFB Jan 2025 May 2025 25 0.216 Y (†) 2026 Nice Sys Inc / Hoboken, NJ C / FFP AFLCMC Tinker AFB Jan 2026 May 2026 25 0.222 Y Cost Elements Voice Recorder Equipment Costs Voice Recorder Equipment Costs (†) P-1 Line Item Number / Title: 833020 / National Airspace System Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 833020 - National Airspace System Air Force UNCLASSIFIED Page 6 of 10 P-1 Line #20 Volume 1 - 158 === page 195 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833020 / National Airspace System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: NAS ATC Voice Recorder Replacement Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Voice Recorder Equipment Costs 1 2025 AF 25 0 25 1 2026 AF 25 0 25 A - - - - 2 2 2 2 2 2 2 2 2 2 A O C T LI 833020 - National Airspace System Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 10 S E P O C T N O V D E C J A N 2 F E B P-1 Line #20 3 M A R 0 A P R 2 M A Y 2 J U N 2 J U L 2 A U G 2 15 S E P Volume 1 - 159 === page 196 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833020 / National Airspace System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: NAS ATC Voice Recorder Replacement Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Voice Recorder Equipment Costs 1 2025 AF 25 25 0 1 2026 AF 25 10 15 0 2 O C T LI 833020 - National Airspace System Air Force 2 N O V 2 D E C 2 J A N 2 F E B 2 M A R 3 A P R 0 M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #20 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 160 === page 197 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 P-1 Line Item Number / Title: 833020 / National Airspace System Item Number / Title [DODIC]: NAS ATC Voice Recorder Replacement Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1 Nice Sys Inc - Hoboken, NJ 1-8-5 For 2027 MAX For 2027 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 0 Manufacturing PLT 4 Total After Oct 1 4 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 833020 - National Airspace System Air Force UNCLASSIFIED Page 9 of 10 P-1 Line #20 Volume 1 - 161 8 === page 198 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 833020 / National Airspace System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: NAS ATC Voice Switch Replacement MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 6.781 5.023 0.000 - 0.000 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 6.781 5.023 0.000 - 0.000 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 6.781 5.023 0.000 - 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - 0.360 - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Support - ATC Voice Switch Replacement Cost DoD requirements design/Integration, testing, engineering change proposals, technical orders - - - - - 5.423 - - 3.064 - - 0.000 - - - - - 0.000 Program Support Costs (PSC) - - - - - 1.098 - - 1.400 - - 0.000 - - - - - 0.000 Direct Mission Support (DMS) - - - - - 0.260 - - 0.559 - - 0.000 - - - - - 0.000 Subtotal: Support - ATC Voice Switch Replacement Cost - - - - - 6.781 - - 5.023 - - 0.000 - - - - - 0.000 Gross/Weapon System Cost - - - - - 6.781 - - 5.023 - - 0.000 - - - - - 0.000 Secondary Distribution AF Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 833020 - National Airspace System Air Force FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total - - - - - 6.781 5.023 0.000 - 0.000 - - - - - 6.781 5.023 0.000 - 0.000 UNCLASSIFIED Page 10 of 10 P-1 Line #20 Volume 1 - 162 === page 199 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833030 / Battle Control System - Fixed Equip / BSA 3: Electronics Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 22.764 16.592 3.391 - 3.391 3.463 3.528 3.592 3.663 - 56.993 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 22.764 16.592 3.391 - 3.391 3.463 3.528 3.592 3.663 - 56.993 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 22.764 16.592 3.391 - 3.391 3.463 3.528 3.592 3.663 - 56.993 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Battle Control System-Fixed (BCS-F) supports the North American Aerospace Defense Command/ Northern Command (NORAD/NORTHCOM) homeland defense and air sovereignty mission for fixed Air Defense Sectors. BATTLE CONTROL SYSTEM-FIXED (BCS-F): BCS-F is a bi-national program with Canada. The BCS-F Program is an AF Homeland Defense battle management command and control system with the capability to integrate data from existing and future civil and military defense surveillance systems into a comprehensive air picture. BCS-F provides tactical communications and data link capabilities with other military and civil systems responsible for planning, directing, coordinating and controlling forces for air surveillance, air defense, and control of sovereign US air space. This integrated air picture enhances the capability to conduct peacetime air sovereignty operations, and transition to active air defense operations in the event of aggression. Life cycle replacement will be required to prevent system obsolescence, account for new cyber security requirements and posture the program to seamlessly integrate future capabilities. Provides for capital equipment replacement activities at the fixed Air Defense Sectors, which include, but are not limited to: infrastructure upgrades, future Diminishing Manufacturing Sources (DMS), and replacement of other equipment that does not qualify for Centralized Asset Management (CAM) funding. NATIONAL CAPITOL REGION - INTEGRATED AIR DEFENSE SYSTEM (NCR-IADS): NCR-IADS is a post-September 11, 2001 rapidly fielded capability that provides ground-based air defense of the NCR airspace by delivering an integrated air picture, air defense weapons, Enhanced Regional Situational Awareness (ERSA), and forensic data collection capabilities. Life cycle replacement will be required to prevent system obsolescence, account for new cyber security requirements, infrastructure upgrades, and to posture the program to seamlessly integrate future capabilities. FY 2027 request was reduced by $0.009 million for Advisory and Assistance Services to promote efficiencies and advance the policies of the Administration in alignment with Executive Order 14222, implementing the President's Department of Government Efficiency Cost Efficiency Initiatives. FY25 BCS-F Funding does not reflect $9.106M congressional recission. Funding for this exhibit is contained in PE 0102326F. LI 833030 - Battle Control System - Fixed Air Force UNCLASSIFIED Page 1 of 8 P-1 Line #21 Volume 1 - 163 === page 200 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833030 / Battle Control System - Fixed Equip / BSA 3: Electronics Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Region/Sector Operation Control Center Modernization Program P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 22.764 - / 16.592 - / 3.391 - / - - / 3.391 - / - - / 22.764 - / 16.592 - / 3.391 - / - - / 3.391 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 decrease is a result of completion of the Enhanced Regional Situational Awareness (ERSA) modernization procurement that replaced end-of-life systems. BATTLE CONTROL SYSTEM-FIXED (BCS-F): While the Cloud-Based Command and Control (CBC2) system is scheduled for Operational Acceptance in 4QFY26, FY27 funding for BCS-F is critical to bridge the operational gap and mitigate risks during its potential deprecation period. This funding serves as a vital safeguard for the homeland defense mission; should unforeseen issues arise in FY27 or if Operational Acceptance is not realized as planned, this appropriation is essential for continued mission capability. These funds will ensure the system's viability by supporting hardware upgrades for new sensor integration, non-CAM hardware and spares, site configuration updates, and maintaining the mandated cyber security posture and Authority to Operate (ATO) requirements through the transition. NATIONAL CAPITAL REGION - INTEGRATED AIR DEFENSE SYSTEM (NCR-IADS): FY 2027 funds will support, but are not limited to, hardware and software upgrades to seamlessly integrate new and emerging sensors and technologies, hardware and software upgrades and spares that do not qualify for Centralized Asset Management (CAM) funding, and hardware and software to maintain the mandated cyber security posture and Authority to Operate (ATO) requirements. PROGRAM SUPPORT COSTS (PSC): FY 2027 funds for PSC will support the management, engineering and technical support for the program office. This funding request supports potential Diminishing Manufacturing Sources (DMS) and obsolescence solutions, to support if optimal, life of type buys or bridge buys limited to the program of record quantity. LI 833030 - Battle Control System - Fixed Air Force UNCLASSIFIED Page 2 of 8 P-1 Line #21 Volume 1 - 164 === page 201 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 833030 / Battle Control System - Fixed Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Region/Sector Operation Control Center Modernization Program MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 22.764 16.592 3.391 - 3.391 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 22.764 16.592 3.391 - 3.391 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 22.764 16.592 3.391 - 3.391 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Battle Control System Fixed Cost Recurring Cost BCS-F Tech Refresh - - - - - 9.106 - - 1.500 - - 1.011 - - - - - 1.011 Subtotal: Recurring Cost - - - - - 9.106 - - 1.500 - - 1.011 - - - - - 1.011 Subtotal: Hardware - Battle Control System Fixed Cost - - - - - 9.106 - - 1.500 - - 1.011 - - - - - 1.011 - - - 1.792 10.753 2.024 12.142 - - - - - - - - - NCR-IADS Tech Refresh - - - - - 1.075 - - 0.766 - - - - - - - - - Subtotal: Recurring Cost - - - - - 11.828 - - 12.908 - - - - - - - - - Subtotal: Hardware - NCRIADS Cost - - - - - 11.828 - - 12.908 - - - - - - - - - Hardware - NCR-IADS Cost Recurring Cost NCR-IADS ERSA Camera (†) Modernization 6 6 Support - Battle Control System Fixed Cost Contractor Services Support - - - - - 1.165 - - 1.689 - - 2.365 - - - - - 2.365 Direct Mission Support - - - - - 0.015 - - 0.015 - - 0.015 - - - - - 0.015 Subtotal: Support - Battle Control System Fixed Cost - - - - - 1.180 - - 1.704 - - 2.380 - - - - - 2.380 Support - NCR-IADS Cost LI 833030 - Battle Control System - Fixed Air Force UNCLASSIFIED Page 3 of 8 P-1 Line #21 Volume 1 - 165 === page 202 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 833030 / Battle Control System - Fixed Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Region/Sector Operation Control Center Modernization Program MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Contractor Support Services - - - - - 0.650 - - 0.300 - - - - - - - - - Direct Mission Support - - - - - - - - 0.180 - - - - - - - - - Subtotal: Support - NCRIADS Cost - - - - - 0.650 - - 0.480 - - - - - - - - - Gross/Weapon System Cost - - - - - 22.764 - - 16.592 - - 3.391 - - - - - 3.391 Remarks: FY25 BCS-F Funding does not reflect $9.106M congressional recission. Recission is reflected in the BCSF FY25 Hardware Tech Refresh line. (†) indicates the presence of a P-5a LI 833030 - Battle Control System - Fixed Air Force UNCLASSIFIED Page 4 of 8 P-1 Line #21 Volume 1 - 166 === page 203 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements NCR-IADS ERSA Camera (†) Modernization NCR-IADS ERSA Camera (†) Modernization (†) O O C P-1 Line Item Number / Title: 833030 / Battle Control System - Fixed Item Number / Title [DODIC]: Region/Sector Operation Control Center Modernization Program FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) 2025 Various / Various C / Various AFLCMC Hanscom AFB Aug 2025 Dec 2025 6 1.792 Y Feb 2023 2026 Various / Various C / Various AFLCMC Hanscom AFB Mar 2026 Jun 2026 6 2.024 Y Feb 2023 Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 833030 - Battle Control System - Fixed Air Force UNCLASSIFIED Page 5 of 8 P-1 Line #21 Volume 1 - 167 === page 204 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833030 / Battle Control System - Fixed Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Region/Sector Operation Control Center Modernization Program Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P NCR-IADS ERSA Camera Modernization 1 2025 AF 6 0 6 1 2026 AF 6 0 6 A - - - - 1 1 1 1 1 A O C T LI 833030 - Battle Control System - Fixed Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 8 S E P O C T N O V D E C J A N F E B P-1 Line #21 M A R 1 A P R 0 M A Y 1 J U N 1 J U L 1 A U G 1 S E P Volume 1 - 168 2 === page 205 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833030 / Battle Control System - Fixed Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Region/Sector Operation Control Center Modernization Program Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E NCR-IADS ERSA Camera Modernization 1 2025 AF 6 6 0 1 2026 AF 6 4 2 0 1 O C T LI 833030 - Battle Control System - Fixed Air Force 1 N O V 0 D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 8 S E P O C T N O V D E C J A N F E B P-1 Line #21 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 169 === page 206 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833030 / Battle Control System - Fixed Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Item Number / Title [DODIC]: Region/Sector Operation Control Center Modernization Program Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Various - Various MSR For 2027 1-8-5 For 2027 MAX For 2027 6 6 6 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 6 Manufacturing PLT 6 Total After Oct 1 3 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 833030 - Battle Control System - Fixed Air Force UNCLASSIFIED Page 8 of 8 P-1 Line #21 Volume 1 - 170 9 === page 207 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833040 / Theater Air Control Sys Improvemen Equip / BSA 3: Electronics Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Procurement Quantity (Units in Each) - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 56.143 27.650 11.640 - 11.640 39.258 39.998 40.752 41.566 - Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 56.143 27.650 11.640 - 11.640 39.258 39.998 40.752 41.566 - Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 56.143 27.650 11.640 - 11.640 39.258 39.998 40.752 41.566 - Total 257.007 257.007 257.007 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The AN/TSY-7 Control and Reporting Center (CRC) is a mobile, ground-based battle management command and control (BMC2) theater air control system (TACS). It is a modular, transportable, and persistent tactical level weapon system which provides direct command and control to air assets in an assigned Area of Responsibility (AOR) and reports back to the Joint Force Air Component Commander (JFACC). The CRC is composed of the following subsystems: AN/TYQ-23A(V)1 Tactical Air Operations Module (TAOM), the AN/TSC-250 communication Data Link System (CDLS), the AN/TRC-213/214 Remote Radio Secure Voice System (RRSVS), the AN/TPS-75 organic sensor, and associated mission support equipment. The CRC Capability Roadmap provides for the modernization of the CRC subsystems and will be programmed into phased updates through 2037 to further advance current and future battlespace awareness and tactical battle management command and control capabilities. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. Funding for this exhibit contained in PE 0207412F. Efforts within this PE align with USAF investment in ABMS (0604003F) and Air Base Air Defense Systems (0207522F) to deliver a common hardware and software baseline for DAF BATTLE NETWORK deployable systems. LI 833040 - Theater Air Control Sys Improvemen Air Force UNCLASSIFIED Page 1 of 3 P-1 Line #22 Volume 1 - 171 === page 208 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833040 / Theater Air Control Sys Improvemen Equip / BSA 3: Electronics Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Theater Air Control System Improvement P-40 Total Gross/Weapon System Cost Subexhibits ID CD A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 56.143 - / 27.650 - / 11.640 - / - - / 11.640 - / - - / 56.143 - / 27.650 - / 11.640 - / - - / 11.640 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: In FY 2027, the CRC will continue to align and integrate the Department of the Air Force (DAF) Battle Network efforts to modernize and standardize deployable data flows, provide agnostic communications capabilities, and incorporate modern Advanced Battle Management System (ABMS) standards and components. These efforts include, but not limited to, the purchase of radios and M Code timing source to support upgrade of tactical data links, the procurement and integration of MILSATCOM and Proliferated Low Earth Orbit Commercial Satellite Communication (PLEO SATCOM) systems, and procurement of prime movers. The FY 2027 overall funding level is reduced due to the planned procurement profile of the Remote Radio Secure Voice System (RRSVS) modernization effort. The majority of this procurement occurred in FY 2025 and FY2026. This investment supports the future Joint Force digital infrastructure by eliminating legacy system obsolescence, incorporating Advanced Battle Management System (ABMS) standards and components, and meeting other critical operational mandates. LI 833040 - Theater Air Control Sys Improvemen Air Force UNCLASSIFIED Page 2 of 3 P-1 Line #22 Volume 1 - 172 === page 209 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 833040 / Theater Air Control Sys Improvemen Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Theater Air Control System Improvement MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 56.143 27.650 11.640 - 11.640 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 56.143 27.650 11.640 - 11.640 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 56.143 27.650 11.640 - 11.640 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Theater Air Control System Improvement Cost Recurring Cost CRC Networking and Data Transport - - - - - 21.944 - - 15.354 - - 2.765 - - - - - 2.765 Remote Radio Secure Voice System Major Release 2 (MR2) - - - - - 31.500 - - - - - - - - - - - - CRC Modernization - - - - - - - - 7.949 - - 8.875 - - - - - 8.875 Program Support - - - - - - - - 3.352 - - - - - - - - - Subtotal: Recurring Cost - - - - - 53.444 - - 26.655 - - 11.640 - - - - - 11.640 Remote Radio Secure Voice System Delivery and Install - - - - - 2.699 - - 0.995 - - - - - - - - - Subtotal: Non Recurring Cost - - - - - 2.699 - - 0.995 - - - - - - - - - Subtotal: Hardware Theater Air Control System Improvement Cost - - - - - 56.143 - - 27.650 - - 11.640 - - - - - 11.640 Gross/Weapon System Cost - - - - - 56.143 - - 27.650 - - 11.640 - - - - - 11.640 Non Recurring Cost Remarks: FY26 funding for Remote Radio Secure Voice Systems Delivery and Install in the amount of $.995M is funding for USAFE in support of the Battle Management Command and Control (BMC2) Center. LI 833040 - Theater Air Control Sys Improvemen Air Force UNCLASSIFIED Page 3 of 3 P-1 Line #22 Volume 1 - 173 === page 210 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 174 === page 211 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833060 / 3D Expeditionary Long-Range Radar Equip / BSA 3: Electronics Programs ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0207455F Other Related Program Elements: 0207455F Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 13.169 13.432 - - - - 13.169 13.432 - 148.065 148.065 148.065 96.022 96.022 96.022 103.226 103.226 103.226 430.607 430.607 430.607 - 430.607 430.607 430.607 392.929 392.929 392.929 419.114 419.114 419.114 To FY 2031 Complete - - - 13.169 13.432 - Total 1,616.564 1,616.564 1,616.564 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The Three-Dimensional Expeditionary Long-Range Radar (3DELRR) program develops the AN/TPY-4 system which is the designated replacement for the AN/TPS-75 radar. The 3DELRR system will be the United States Air Force's (USAF's) principal long-range, ground-based sensor for detecting, identifying, tracking, and reporting aerial tracks for the Joint Force Air Component Commander (JFACC). The 3DELRR system consists of the AN/TPY-4 radar and associated Direct Mission Support (DMS) ground equipment which includes Prime Movers, Generators, and other smaller mission support items such as necessary crypto and prime mover diagnostic equipment. The 3DELRR system will provide multiple benefits and increased capabilities to the USAF and the Joint Services, including: the ability to detect and track modern and emerging highly maneuverable, small radar cross-section airborne targets; greater battlefield and battlespace awareness through a precise, real-time air picture of sufficient quality to control individual aircraft under a wide range of environmental and operational conditions; and increased reliability, operational availability, maintainability, transportability, survivability, and sustainability. FY 2027 funding will continue the procurement of 3DELRR systems and provide Interim Contractor Support (ICS) to the fielded operational units as well as begin effort to stand up an organic depot. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. Funding for this exhibit is contained in PE 0207455F. LI 833060 - 3D Expeditionary Long-Range Radar Air Force UNCLASSIFIED Page 1 of 9 P-1 Line #23 Volume 1 - 175 === page 212 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833060 / 3D Expeditionary Long-Range Radar Equip / BSA 3: Electronics Programs ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0207455F Other Related Program Elements: 0207455F Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 3D Expeditionary Long-Range Radar P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 B MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 148.065 - / 96.022 - / 103.226 - / 430.607 - / - - / 430.607 - / 148.065 - / 96.022 - / 103.226 - / 430.607 - / - - / 430.607 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 increase allows the procurement of an additional twelve (12) The Three-Dimensional Expeditionary Long-Range Radar (3DELRR) systems on the basis of the pre-negotiated firm fixed price cost structure of the procurement contract and scales up the interim contractor support to accommodate the additional fielded systems until an organic USAF support capability is established. This investment will allow for the replacement of AN/TPS-75 and ARSR-4 radars and provides the warfighter with a reliable and threat relevant long range radar system. Production Units: FY 2027 funds will procure twelve (12) 3DELRR systems, to include the necessary logistics and program support associated with the delivery of the system. Direct Mission Support (DMS) Equipment: FY 2027 funds will procure equipment associated with the 3DELRR systems. Equipment includes Prime Movers, Generators, and support equipment. Prime Movers and generators are sent directly to the operational units. The remaining equipment is sent to Lockheed Martin as Government Furnished Property (GFP) for integration with the TPY-4. ARSR-4 Site Prep: FY 2027 funds will support site preparations for the replacement of ARSR-4 radars at fixed sites. Organic Depot Standup: FY 2027 funds will begin standup of an organic depot for 3DELRR systems. Interim Contractor Support (ICS): FY 2027 funds will provide ICS to fielded units. LI 833060 - 3D Expeditionary Long-Range Radar Air Force UNCLASSIFIED Page 2 of 9 P-1 Line #23 Volume 1 - 176 === page 213 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 833060 / 3D Expeditionary Long-Range Radar Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: 3D Expeditionary Long-Range Radar MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) - 148.065 Less PY Advance Procurement ($ in Millions) 96.022 - Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) 430.607 - - - 103.226 430.607 - 430.607 - 96.022 FY 2027 Total - - 103.226 - 148.065 - - 96.022 - Total Obligation Authority ($ in Millions) FY 2027 OOC - 103.226 - 148.065 FY 2027 Base - 430.607 - 430.607 - - 430.607 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - 3D Expeditionary Long-Range Radar Cost Recurring Cost Production Units (†) Subtotal: Recurring Cost 22.194 - 3 - 66.582 24.798 74.393 22.233 88.931 21.694 12 260.322 - - - 21.694 12 260.322 66.582 - - 3 74.393 - - 4 88.931 - - 260.322 - - - - - 260.322 81.483 - - - - - - - - - - - - - - - - - - - - - - Non Recurring Cost NORAD NORTHCOM Production Units (†) 20.371 4 Subtotal: Non Recurring Cost - - 81.483 - - - - - - - - Subtotal: Hardware - 3D Expeditionary Long-Range Radar Cost - - 148.065 - - 74.393 - - 88.931 - - 260.322 - - - - - 260.322 0.040 13.604 13.604 Support - 3D Expeditionary Long-Range Radar Cost Program Support Costs - - - - - (1) - - (2) - - (3) - - - - - Direct Mission Support - - - - - 1.791 - - 2.465 - - 7.550 - - - - - 7.550 Prime Mover - - - - - - - - - - - 39.511 - - - - - 39.511 ARSR-4 Site Prep - - - - - - - - - - - 68.629 - - - - - 68.629 Interim Contractor Support - - - - - 7.933 - - 11.790 - - 16.874 - - - - - 16.874 Organic Depot Standup - - - - - - - - - - - 24.117 - - - - - 24.117 Subtotal: Support - 3D Expeditionary Long-Range Radar Cost - - - - - 21.629 - - 14.295 - - 170.285 - - - - - 170.285 LI 833060 - 3D Expeditionary Long-Range Radar Air Force 11.905 UNCLASSIFIED Page 3 of 9 P-1 Line #23 Volume 1 - 177 === page 214 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 833060 / 3D Expeditionary Long-Range Radar Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: 3D Expeditionary Long-Range Radar MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Gross/Weapon System Cost Unit Cost ($ M) - FY 2025 Total Cost Qty (Each) ($ M) - Unit Cost ($ M) 148.065 - FY 2026 Total Cost Qty (Each) ($ M) - 96.022 Unit Cost ($ M) Qty (Each) - FY 2027 Base Total Cost ($ M) - 103.226 Unit Cost ($ M) Qty (Each) - FY 2027 OOC Total Cost ($ M) - 430.607 Unit Cost ($ M) - FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) - ($ M) - - Total Cost Qty (Each) ($ M) - 430.607 Remarks: Change from FY27BES due to purchasing an additional radar in FY26, and moving some DMS and program costs to FY25 and FY27. Direct Mission Support (DMS) supports the procurement of the required equipment for AN/TPY-4 radars which includes: Prime Movers, Generators, and smaller support equipment. FY 2025, FY 2026 and FY27 unit costs are based on pre-negotiated pricing. FY 2025 and FY 2026 Program Support Costs (PSC) are allocated to both the production program and the RDT&E funded capability development. Costs increase as all RDT&E funding supports the current year's capability development program. Economies of scale in pricing create cost savings. Lower quantity buys force higher per unit cost. FY27 Support Cost increase is due to shuffling of the prime mover requirements from prior years into FY27. This move was done due to a review of the vehicle chosen as the prime mover as well as to free up funding in FY26 for an additional radar. The prime mover requirement is not tied to full funding of the radar system. This large increase is also due to the ARSR-4 replacement requiring additional site prep. (†) indicates the presence of a P-5a Footnotes: (1) (2) (3) In order to purchase an additional radar in FY26, program costs were moved to FY25 and FY27. In order to purchase an additional radar in FY26, program costs were moved to FY25 and FY27. In order to purchase an additional radar in FY26, program costs were moved to FY25 and FY27. LI 833060 - 3D Expeditionary Long-Range Radar Air Force UNCLASSIFIED Page 4 of 9 P-1 Line #23 Volume 1 - 178 === page 215 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements Production Units (†) Production Units (†) Production Units (†) Production Units (†) NORAD NORTHCOM Production (†) Units (†) O O C P-1 Line Item Number / Title: 833060 / 3D Expeditionary Long-Range Radar Item Number / Title [DODIC]: 3D Expeditionary Long-Range Radar FY Contractor and Location Method/Type or Funding Vehicle 2024 Lockheed Martin / Syracuse New York C / FFP AFLCMC/HB Battle Management Jan 2024 Aug 2026 3 22.194 N Aug 2021 2025 Lockheed Martin / Syracuse New York C / FFP AFLCMC/HB Battle Management Jan 2025 Mar 2027 3 24.798 N Aug 2021 2026 Lockheed Martin / Syracuse New York C / FFP AFLCMC/HB Battle Management Jan 2026 Jan 2028 4 22.233 N Aug 2021 2027 Lockheed Martin / Syracuse New York C / FFP AFLCMC/HB Battle Management Jan 2027 Jan 2029 12 21.694 N Aug 2021 2024 Lockheed Martin / Syracuse New York C / FFP AFLCMC/HB Battle Management Jun 2024 Nov 2026 4 20.371 N Aug 2021 Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date Oct 2023 Mar 2024 indicates the presence of a P-21 Remarks: Major Capability Acquisition (MCA) transition planned in FY 2027. LI 833060 - 3D Expeditionary Long-Range Radar Air Force UNCLASSIFIED Page 5 of 9 P-1 Line #23 Volume 1 - 179 === page 216 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833060 / 3D Expeditionary Long-Range Radar Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 3D Expeditionary Long-Range Radar Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Production Units 1 2024 AF 3 0 3 1 2025 AF 3 0 3 A - - - - - - - - - - - - - - - - - - - - - 3 A - - - - - - - - - 1 2026 AF 4 0 4 3 4 1 2027 AF 12 0 12 12 0 4 NORAD NORTHCOM Production Units 2 2024 AF 4 A O C T N O V D E C LI 833060 - 3D Expeditionary Long-Range Radar Air Force J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 9 S E P O C T N O V D E C J A N F E B P-1 Line #23 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 180 4 === page 217 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833060 / 3D Expeditionary Long-Range Radar Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 3D Expeditionary Long-Range Radar Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Production Units 1 2024 AF 3 0 3 - - - - - - - - - - 1 2025 AF 3 0 3 - - - - - - - - - - - 1 - 1 - - 1 - - - 0 1 2026 AF 4 0 4 A - - - - - - - - - - - - - - - - - - - - - 4 1 2027 AF 12 0 12 A - - - - - - - - - 12 0 4 1 1 1 0 NORAD NORTHCOM Production Units 2 2024 AF 4 O C T N O V D E C LI 833060 - 3D Expeditionary Long-Range Radar Air Force J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 9 S E P O C T 1 N O V 1 D E C 1 J A N F E B P-1 Line #23 1 M A R 0 A P R M A Y J U N J U L A U G S E P Volume 1 - 181 === page 218 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833060 / 3D Expeditionary Long-Range Radar Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: 3D Expeditionary Long-Range Radar Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Production Units 1 2024 AF 3 3 0 1 2025 AF 3 3 0 0 1 2026 AF 4 0 4 - - - 1 2027 AF 12 0 12 - - - 4 0 0 1 1 - 1 - 1 - 0 - - - - - - - - - 2 2 - 2 2 - 2 2 0 NORAD NORTHCOM Production Units 2 2024 AF 4 0 O C T N O V D E C LI 833060 - 3D Expeditionary Long-Range Radar Air Force J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 9 S E P O C T N O V D E C J A N F E B P-1 Line #23 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 182 === page 219 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833060 / 3D Expeditionary Long-Range Radar Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: 3D Expeditionary Long-Range Radar Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Lockheed Martin - Syracuse New York 1 12 12 0 0 0 0 9 4 24 28 2 Lockheed Martin - Syracuse New York 1 4 4 0 0 0 0 4 9 29 38 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 833060 - 3D Expeditionary Long-Range Radar Air Force UNCLASSIFIED Page 9 of 9 P-1 Line #23 Volume 1 - 183 === page 220 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 184 === page 221 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833070 / Weather Observation Forecast Equip / BSA 3: Electronics Programs Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0305111F Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Procurement Quantity (Units in Each) - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 31.056 31.516 33.111 - 33.111 33.573 34.205 34.846 35.543 - Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 31.056 31.516 33.111 - 33.111 33.573 34.205 34.846 35.543 - Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 31.056 31.516 33.111 - 33.111 33.573 34.205 34.846 35.543 - Total 233.850 233.850 233.850 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: PE 0305111F WEATHER SERVICE DESCRIPTION The Weather Observation Forecast (WOF) procurement line acquires fixed-base and tactical meteorological equipment, and meteorological information systems supporting the 2026 National Defense Strategy's (NDS) lines of effort. WOF procurement also ensures a dependable environmental observing and sensing network which was identified as one of the key layers in the blueprint for the sensing grid that enables joint all-domain command and control (JADC2). This funding rebuilds readiness for a more lethal and resilient force by procuring and upgrading fixed and tactical equipment for observing and forecasting terrestrial impacts in support of global Air Force (AF), Army, Special Operations Forces (SOF), Space Force (USSF), combatant commands, the Intelligence Community (IC), and other government agencies. Funding to procure and upgrade information systems to process, store, analyze, and disseminate decision-grade weather information enables accurate prediction of environmental impacts to optimize mission planning and execution, targeting, weaponeering, and battle damage assessment, while also enhancing the effectiveness and survivability of AF and Army weapon systems, precision munitions, and AF, USSF, and government agency space systems. Alliances are strengthened through weather system technological upgrades to ensure critical interoperability with Department of War (DoW), allies, and interagency partners in support of joint all-domain combat operations. Funding for WOF also ensures greater performance and affordability through improvements to architecture and system efficiency as well as the retirement of legacy equipment. WOF activities align under two capability areas: Weather Data Collection and Weather Forecasting. This alignment ensures an integrated and systems-oriented approach to program management decisions. Procurement funding for terrestrial impact forecasting is addressed by APPN 3080, PE 0305111F, Weather Observation Forecast. 1. Weather Data Collection Systems: Provides automated atmospheric environmental sensing capabilities at fixed and deployed locations worldwide. The data gathered by multiple sensor systems is exploited for environmental battlespace awareness, characterization, safety of flight and resource protection. A. Fixed Based Weather Systems (FBWS) - The FBWS program is responsible for the management of 394 fixed base automated weather sensor systems consisting of commercially available weather sensors across 265 AF and Army bases. FBWS provides the capability to collect weather elements for aviation surface report generation and dissemination. FBWS sensor data is essential for safe and efficient aviation operations of critical DoW assets, and integration into command and control (C2) systems and nodes as part of a joint all-domain sensing capability. FBWS program is the consolidated acquisition effort of four fixed base weather system technical baselines and sensor collection appliances to create a common sensor baseline and consolidate contract sustainment costs. B. Next-Generation Radar (NEXRAD) - NEXRAD is a Tri-agency (National Weather Service, AF, and Federal Aviation Administration) program that manages 158 Doppler weather radars. It provides networked radar data that is essential for safe and efficient aviation operations; resource protection of critical DoW, government, and commercial assets; and integration into C2 systems and nodes as part of a joint alldomain sensing capability. The AF owns and maintains 24 NEXRAD systems worldwide and performs program actions on these systems to include capital equipment replacement of components reaching end of life. LI 833070 - Weather Observation Forecast Air Force UNCLASSIFIED Page 1 of 12 P-1 Line #24 Volume 1 - 185 === page 222 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833070 / Weather Observation Forecast Equip / BSA 3: Electronics Programs ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: 0305111F Line Item MDAP/MAIS Code: N/A C. Expeditionary Weather (ExMET) - ExMET provides a "first-in/on-the-move" weather solution in the tactical and near-peer environments in support of the 2026 NDS. ExMET delivers a scalable, integrated system of components for sensing, forecasting, and communications capabilities aligning to Operation Plans and contingency Unit Type Codes (UTCs) for agile combat employment of weather Airmen and weather operations. ExMET includes tactical sensors to include the TMQ-53, the Micro/Advanced-Micro Weather Sensor (MWS/AMWS), a next-gen tactical Integrated Weather Observing System (IWOS), as well as solutions for forecasting/data caching/processing workstations that leverages deployed communications capabilities. D. Portable Doppler RADAR/Portable Weather RADAR (PDR/PWR) - PDR/PWR provides tactical weather radar capabilities aligning to Operation Plans and contingency UTCs. PDR will be systematically replaced by the updated PWR systems starting in FY27. 2. Weather Forecasting: Weather Forecasting includes activities for terrestrial physics and AI/ML-based environmental modeling, which provides warfighters with increased global environmental battlespace awareness for use in strategic, operational, and tactical mission planning, rehearsal, and execution through advanced scientific numerical weather prediction capabilities. Provides improvements to specific weather modeling compute and IT hardware capability gaps. A. Numerical Weather Modeling (NWM) - Provides global and regional advanced scientific numerical weather and extreme weather physics and AI/ML-based prediction capabilities for automated, high-resolution forecast products supporting mission planning and operations execution in unclassified and classified enclaves with an emphasis on clouds, theater scale weather, aerosol/chemical constituents, and hydrology. Funding for this exhibit is contained in PE 0305111F. This requirement supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Management services costs include Federally Funded Research and Development Centers (FFRDCs) and Advisory and Assistance Services (A&AS). Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. LI 833070 - Weather Observation Forecast Air Force UNCLASSIFIED Page 2 of 12 P-1 Line #24 Volume 1 - 186 === page 223 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833070 / Weather Observation Forecast Equip / BSA 3: Electronics Programs Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0305111F Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Weather Data Collection Systems P-5 FBWS P-5 Numerical Weather Modeling P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) A - / - - / 9.881 - / 16.667 - / 12.117 - / - - / 12.117 A - / - - / 5.070 - / 8.486 - / 17.384 - / - - / 17.384 A - / - - / 16.105 - / 6.363 - / 3.610 - / - - / 3.610 - / - - / 31.056 - / 31.516 - / 33.111 - / - - / 33.111 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: PE 0305111F WEATHER SERVICE JUSTIFICATION 1. Weather Data Collection Systems: A. FBWS: FY 2027 funding will procure additional fixed-base weather sensor systems, additional sensor components, and communication and dissemination equipment for weather sensing at AF and Army installations, expeditionary airfields, and joint/coalition force locations. Funding for fleet sensor modernization to improve sensing and system efficiency while mitigating components obsolescence will include procurement of a new multi-function aerosol sensor to replace multiple legacy sensors, a replacement lightning sensor, and retrofit of unsupportable wind sensors. B. NEXRAD: FY 2027 funding will continue the procurement of capital equipment replacement items including a power management system and communications components. C. ExMET: FY 2027 funding will procure low-latency weather data dissemination equipment for research and development advanced algorithms for on-site analysis of meteorological and other environmental data and explore AI/ML integration to provide predictive analysis in data-limited/denied environments. D. PDR/PWR: FY 2027 funding will be for the procurement of Portable Weather Radar systems, replacing legacy systems. 2. Weather Forecasting: A. NWM: FY 2027 funding increased as program continues HPC System 11 service life extension and addition of Graphical Processing Units (GPUs) and expanded storage. LI 833070 - Weather Observation Forecast Air Force UNCLASSIFIED Page 3 of 12 P-1 Line #24 Volume 1 - 187 === page 224 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 833070 / Weather Observation Forecast Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Weather Data Collection Systems MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 9.881 16.667 12.117 - 12.117 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 9.881 16.667 12.117 - 12.117 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 9.881 16.667 12.117 - 12.117 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Weather Data Collection Systems Cost Recurring Cost NEXRAD - - - 2.136 1 2.136 1.586 1 1.586 2.090 Expeditionary Weather Tactical Weather Sensor Systems - - - 0.103 62 6.388 0.106 140 14.792 - Portable Weather Radars - - - - - 0.000 0.000 1 0.000 Expeditionary Weather Other Prime - - - 1.106 1.106 - - Subtotal: Recurring Cost - - - - - 9.630 - - - - - - 9.630 - 0.251 0.289 Subtotal: Hardware Weather Data Collection Systems Cost 1 1 2.090 - - - 2.090 1 2.090 - - - - - - - - 0.525 17 8.924 - - - 0.525 17 8.924 - 0.816 1 0.816 - - - 0.816 1 0.816 - 16.378 - - 11.830 - - - - - 11.830 - 16.378 - - 11.830 - - - - - 11.830 0.289 0.287 0.287 - - - 0.287 Support - Weather Data Collection Systems Cost ASSISTANCE AND ADVISORY SERVICE A&AS - - - 0.251 Subtotal: Support - Weather Data Collection Systems Cost - - - - - 0.251 - - 0.289 - - 0.287 - - - - - 0.287 Gross/Weapon System Cost - - - - - 9.881 - - 16.667 - - 12.117 - - - - - 12.117 1 1 1 1 0.287 Remarks: LI 833070 - Weather Observation Forecast Air Force UNCLASSIFIED Page 4 of 12 P-1 Line #24 Volume 1 - 188 === page 225 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 P-1 Line Item Number / Title: 833070 / Weather Observation Forecast ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Weather Data Collection Systems MDAP/MAIS Code: FY25 Recission withhold returned in February 2026 and due to delay in fielding decision and technical maturation of the tactical weather sensor systems, funding was realigned within PE 35111F/BPAC 833070 from Expeditionary Weather to NEXRAD, Fixed Based Weather Systems, and Numerical Weather Modeling shifting requirement needs between Fiscal years. LI 833070 - Weather Observation Forecast Air Force UNCLASSIFIED Page 5 of 12 P-1 Line #24 Volume 1 - 189 === page 226 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 833070 / Weather Observation Forecast Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: FBWS MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 5.070 8.486 17.384 - 17.384 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 5.070 8.486 17.384 - 17.384 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 5.070 8.486 17.384 - 17.384 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Hardware End Item Cost Recurring Cost (†) - - - 1.949 1.949 7.007 7.007 15.294 15.294 - - - 15.294 - - - - - 1.949 - - 7.007 - - 15.294 - - - - - 15.294 - - - - - 1.949 - - 7.007 - - 15.294 - - - - - 15.294 TESTING - - - 0.151 0.151 - - - - - - - - - - - - DIRECT MISSION SUPPORT CONTRACTOR SERVICES - - - - - - - - 0.614 1 0.614 - - - 0.614 1 0.614 PROGRAM SUPPORT COSTS CONTRACTOR SERVICES - - - 2.813 1 2.813 1.140 1 1.140 1.103 1 1.103 - - - 1.103 1 1.103 PROGRAM SUPPORT COSTS OTHER GOVERNMENT COSTS - - - 0.157 1 0.157 0.339 1 0.339 0.373 1 0.373 - - - 0.373 1 0.373 Subtotal: Support - Support End Item Cost - - - - - 3.121 - - 1.479 - - 2.090 - - - - - 2.090 Gross/Weapon System Cost - - - - - 5.070 - - 8.486 - - 17.384 - - - - - 17.384 FBWS Subtotal: Recurring Cost Subtotal: Hardware Hardware End Item Cost 1 1 1 1 15.294 Support - Support End Item Cost 1 - Remarks: Note: Actual number of systems procured will be dependent on location and site requirements. LI 833070 - Weather Observation Forecast Air Force UNCLASSIFIED Page 6 of 12 P-1 Line #24 Volume 1 - 190 === page 227 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 P-1 Line Item Number / Title: 833070 / Weather Observation Forecast ID Code (A=Service Ready, B=Not Service Ready) : A (†) Item Number / Title [DODIC]: FBWS MDAP/MAIS Code: indicates the presence of a P-5a LI 833070 - Weather Observation Forecast Air Force UNCLASSIFIED Page 7 of 12 P-1 Line #24 Volume 1 - 191 === page 228 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (†) FBWS (†) FBWS (†) FBWS (†) O O C P-1 Line Item Number / Title: 833070 / Weather Observation Forecast Method/Type or Funding Vehicle Item Number / Title [DODIC]: FBWS Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty RFP Issue Date FY Contractor and Location 2025 Mesotech International, Inc / Sacramento, CA Various AFLCMC Hanscom AFB Jan 2025 May 2025 1 1.949 Y Jul 2024 2026 Mesotech International, Inc / Sacramento, CA Various AFLCMC Hanscom AFB Jan 2026 Jun 2026 1 7.007 Y May 2025 2027 Mesotech International, Inc / Sacramento, CA Various AFLCMC Hanscom AFB Jan 2027 May 2027 1 15.294 Y (Each) indicates the presence of a P-21 LI 833070 - Weather Observation Forecast Air Force UNCLASSIFIED Page 8 of 12 P-1 Line #24 Volume 1 - 192 === page 229 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833070 / Weather Observation Forecast Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # PROC QTY Item Number / Title [DODIC]: FBWS Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT FY SERVICE 1 2025 AF 1 0 1 1 2026 AF 1 0 1 1 2027 AF 1 0 1 Fiscal Year 2026 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E FBWS A - - - - 1 0 A - - - - - 1 0 1 O C T LI 833070 - Weather Observation Forecast Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #24 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 193 === page 230 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833070 / Weather Observation Forecast Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # PROC QTY Item Number / Title [DODIC]: FBWS Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT FY SERVICE 1 2025 AF 1 1 0 1 2026 AF 1 1 0 1 2027 AF 1 0 1 Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E FBWS 0 0 A O C T LI 833070 - Weather Observation Forecast Air Force N O V D E C J A N F E B M A R A P R 1 M A Y 0 J U N J U L A U G UNCLASSIFIED Page 10 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #24 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 194 === page 231 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833070 / Weather Observation Forecast Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: FBWS Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Mesotech International, Inc Sacramento, CA MSR For 2027 1-8-5 For 2027 MAX For 2027 1 1 1 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 1 Manufacturing PLT 4 Total After Oct 1 4 Remarks: Reorder Prior to 1 Oct is required is N/A as items aren't delivered prior to the fiscal year beginning "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 833070 - Weather Observation Forecast Air Force UNCLASSIFIED Page 11 of 12 P-1 Line #24 Volume 1 - 195 8 === page 232 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 833070 / Weather Observation Forecast Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Numerical Weather Modeling MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 16.105 6.363 3.610 - 3.610 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 16.105 6.363 3.610 - 3.610 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 16.105 6.363 3.610 - 3.610 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Hardware End Item Cost Recurring Cost Numerical Weather Modeling - - - 15.954 15.954 6.258 6.258 3.502 3.502 - - - 3.502 Subtotal: Recurring Cost - - - - - 15.954 - - 6.258 - - 3.502 - - - - - 3.502 - - - - - 15.954 - - 6.258 - - 3.502 - - - - - 3.502 PROGRAM SUPPORT COSTS OTHER GOVERNMENT COSTS - - - 0.151 0.151 0.105 0.105 0.108 0.108 - - - 0.108 Subtotal: Support - Support End Item Cost - - - - - 0.151 - - 0.105 - - 0.108 - - - - - 0.108 Gross/Weapon System Cost - - - - - 16.105 - - 6.363 - - 3.610 - - - - - 3.610 Subtotal: Hardware Hardware End Item Cost 1 1 1 1 3.502 Support - Support End Item Cost LI 833070 - Weather Observation Forecast Air Force 1 1 UNCLASSIFIED Page 12 of 12 1 P-1 Line #24 1 0.108 Volume 1 - 196 === page 233 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833140 / Strategic Command And Control Equip / BSA 3: Electronics Programs Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Procurement Quantity (Units in Each) - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 53.480 82.912 89.931 - 89.931 69.994 50.073 38.997 39.973 - Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 53.480 82.912 89.931 - 89.931 69.994 50.073 38.997 39.973 - Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 53.480 82.912 89.931 - 89.931 69.994 50.073 38.997 39.973 - Total 425.360 425.360 425.360 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: This procurement document supports multiple programs. PE 0101127F, B-2: B-2 SUPPORT: The B-2 weapon system relies heavily on C2 equipment to meet its operational capability. Funding is used to replace obsolete computer equipment, backbone infrastructure hardware and software, and long haul communications equipment at the Weapon System Support Center (WSSC) Ground Test Facility (GTF), and contractor laboratories. This includes commercial off-the-shelf (COTS) items such as computers, displays, printers, disk and tape drives, software (e.g. computer-aided design (CAD) and analysis software) as well as engineering and logistical support. Funds also procure specialized computers that provide on-line access to B-2 aircraft data and low observable analysis capabilities. Unique B-2 security and communication infrastructure needs are also addressed. The B-2 WSSC GTF, located at Oklahoma Air Logistics Center, Tinker AFB, OK, supports two critical functions: aircraft software development and maintenance/support, plus systems engineering support for the fielded weapon system. Software maintenance fixes to aircraft systems include flight controls, flight management, navigation systems, weapons/armament and the defensive management system. These software fixes are accomplished and tested with the use of the WSSC software development system and integration/test laboratory complex by analyzing and designing fixes to the existing aircraft software. The WSSC GTF also provides engineering support with specialized computer systems that provide online access to B-2 aircraft data. This data consists of items such as engineering and organic low observable analysis, manufacturing, aircraft design data used to help solve technical issues on the B-2. Locations where this data is used include Tinker AFB, Whiteman AFB, Wright-Patterson AFB, Northrop-Grumman in Palmdale, CA and forward operating locations (FOL). Funding for this exhibit contained in PE 0101127F. PE 0101316F, Worldwide Joint Strategic Communications: Emergency Action Messages (EAMs) are highly structured, authenticated messages primarily used in the command and control of nuclear forces. They are disseminated over numerous survivable and nonsurvivable communication systems including terrestrial and space systems. Programmed funds procure system components, spares, software, and necessary support services for systems such as the Strategic Automated Command and Control System (SACCS), Phoenix Air-to-Ground Communication Network (PAGCN), and Defense Injection Reception EAM C2 Terminals (DIRECT). LI 833140 - Strategic Command And Control Air Force UNCLASSIFIED Page 1 of 24 P-1 Line #25 Volume 1 - 197 === page 234 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833140 / Strategic Command And Control Equip / BSA 3: Electronics Programs ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A SACCS is a secure Nuclear Command, Control, and Communications (NC3) system that directly supports National Command Authority (NCA) communications in the command and control of strategic and nonstrategic forces. SACCS enables the NCA to disseminate Higher Authority Command Messages, Force Direction Messages, EAMs, and automated intercontinental ballistic missile (ICBM) re-targeting data to the USAF's two legs (ICBM and bomber fleets) of the nuclear triad; the reconnaissance, tanker, USAFE munitions, and Special Operations communities; and to other Active Duty, Guard, and Reserve DoW users worldwide. DIRECT includes the hardware and software to enable the NCA to transmit nuclear and non-nuclear EAMs and other time-critical messages to strategic and non-strategic forces. The specific items procured may vary depending upon available technology at the time of procurement. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. PAGCN is a critical component of the Senior Leadership Command, Control and Communications System (SLC3S) that extends terrestrial Defense Information Systems Network (DISN) connectivity via an airto-ground line-of-sight (LoS) communications path to select Airborne and Ground Mobile platforms, and provides an air-to-air LoS communications path between PAGCN-equipped platforms. The FY2018 NDAA directed the transfer of the PAGCN program from the Defense Information Systems Agency (DISA) to the Air Force Program Executive Officer for Nuclear Command, Control and Communications (AFPEO NC3); the program office transition from DISA to the Air Force was completed on 1 Oct 2020. FY 2027 funds will be used to procure 2 new Ground Entry Points, initial spares and repair parts for each new site (2 sites per year) as they come online in order to build the PAGCN capability to the level required by the Joint Requirements Oversight Council (JROC)-validated Capability Production Document (CPD). Funding will also be used for MRT2 Retrofit: Effort started to mitigate Diminishing Manufacturing Sources and Material Shortages (DMSMS) however it expanded to increase capability. Additional information can be provided at higher classification levels. Development funding for this exhibit contained in PE 0101316F. PE 0304115F, Joint All Domain Command & Control (JADC2): PE 0304115F supports the United States Air Force's (USAF) Advanced Battle Management System (ABMS) Battle Lab to provide a warfighter-centric environment for experimentation, innovation, and Tactics Techniques and Procedures (TTP) development for multiple Advanced Battle Management/Joint All Domain Command & Control (ABMS/JADC2) events and capabilities. The mission of the ABMS Battle Lab is to evolve Joint All-Domain Operations (JADO) concepts and architectures to accelerate delivery of agile, resilient, and integrated joint Command & Control (C2) capabilities. This program builds the USAF's Distributed ABMS/CJADC2 Battle Lab communication and information technology Secret and Secret//Releasable architecture to support ABMS experimentation and integration activities required to evaluate advanced technologies from agencies such as Defense Advanced Research Projects Agency (DARPA), Air Force Research Laboratory (AFRL), Missile Defense Agency (MDA), Air Combat Command (ACC),and other leading intel, air, space, and cyber C2 capabilities being developed for possible inclusion into the Battle Management Command & Control (BMC2) ecosystem. PE 0304115F also supports the United States Air Forces Europe and Africa (U-A) C2 architecture, which requires a high-quality, robust, secure, and resilient radiofrequency (RF) voice communication platform that extends ground-to-air radio coverage in theater and enhances theater C2 capability. US tactical C2 nodes in theater are unable to maintain positive control of assigned air assets due to lack of ground-to-air radio coverage in theater. A highly accessible radio network, consisting of ultra high frequency (UHF/VHF), high frequency (HF), tactical satellite (TACSAT), and Link-16 with Over The Air Encryption capability emplaced on US controlled and Partner facilities will close RF communication gaps in the United States European Command (EUCOM) theater. The capability must also be postured for network accreditation to enable quick implementation to enable agile/dispersed tactical command and control (i.e. Agile Battle Management Command and Control (BMC2) mission employment). Increased ground-to-air coverage enhances the ability to distribute recognized air picture and improve overall theater indications and warning, safety of flight, and situational awareness across mission sets. Funding for this exhibit contained in PE 0304115F PE 0303248F, All Domain Common Platform (ADCP): The ADCP is an extensible cloud-based Infrastructure and Platform as a Service (IaaS/PaaS) hosting medium built to deliver highly resilient Command and Control (C2) mission applications and data to Airmen deployed around the world. ADCP is a warfighting capability that enables on-boarded users to build, deploy and monitor mission applications to the end state of production. Having applications operational in various environments ensures data is accessible as it is needed across United States Air Force (USAF) mission sets. The ADCP's collection of technologies, services, and tooling enables warfighter outcomes by abstracting away technical complexity and enabling the deployment of products onto its infrastructure. LI 833140 - Strategic Command And Control Air Force UNCLASSIFIED Page 2 of 24 P-1 Line #25 Volume 1 - 198 === page 235 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833140 / Strategic Command And Control Equip / BSA 3: Electronics Programs ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A The ADCP is the primary path to production for modernized C2 software-intensive systems. Platform customers include the Air Operations Center (AOC), Intelligence Programs, and others. ADCP is USAF's contributing platform to the DAF Battle Network and Joint All-Domain Command and Control (JADC2), meeting system resiliency requirements through the escalating phases of warfare. Funding supports hardware technology refresh of Application Transformation (AppTx) and Maven Smart Systems (MSS) and procurement of networking and compute/store equipment required to support distributed and disconnected operations requirements. Funding for this exhibit contained in PE 0303248F. LI 833140 - Strategic Command And Control Air Force UNCLASSIFIED Page 3 of 24 P-1 Line #25 Volume 1 - 199 === page 236 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833140 / Strategic Command And Control Equip / BSA 3: Electronics Programs Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 B-2 Squadrons A - / - 1 / 0.578 1 / 0.589 1 / 0.614 - / - 1 / 0.614 P-5 Worldwide Joint Strategic Communications P-5a, P-21 B - / - - / 32.181 - / 45.696 - / 61.818 - / - - / 61.818 P-5 Joint All Domain Command & Control (JADC2) P-5a, P-21 A - / - - / 15.353 - / 34.772 - / 25.585 - / - - / 25.585 P-5 All Domain Common Platform P-5a, P-21 A - / - - / 5.368 - / 1.855 - / 1.914 - / - - / 1.914 P-40 Total Gross/Weapon System Cost - / - - / 53.480 - / 82.912 - / 89.931 - / - - / 89.931 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: PE 0101127F B-2 Squadrons: FY2027 funding will procure B-2 Weapon System Support Center software. FY 2027 funding includes a 21,000 increase to offset the impact of inflation. PE 0101316F Worldwide Joint Strategic: PAGCN: FY 2027 funds will be used to procure 2 new Ground Entry Points as to build the PAGCN capability to the level required by the Joint Requirements Oversight Council (JROC)-validated Capability Production Document (CPD). Additional information can be provided at higher classification levels. PE 0304115F Joint All Domain Command & Control (JADC2): FY 2027 procurement funds will be used to continue advancing the US Air Force's Distributed Air Battle Management System (ABMS)/Joint All Domain Command and Control (JADC2) Battle Lab communications and infrastructure technology architecture to support ABMS experimentation and integration activities required to evaluate advanced technologies such as ABMS transformation model experimentation (Decision Advantage Sprint for Human-Machine-Teaming [DASH] events), ACC Project Nexus & MTE series, ShOC-N Capstone, USAFWC Bamboo Eagle, Army Project Convergence, and pending Point Defense experimentation requirements. Planned and ongoing procurements include: a. Dynamic mission replanning and instrumentation hardware, software, and support b. Impact Level 6 (IL-6) Network Infrastructure modernization of Battle Lab components reaching end-of-life/end-of-support c. Unclassified Battle Lab for the DevSecOps Environment and Transformational Model -Decision Advantage Sprint for Human-Machine-Teaming (DASH) events d. Multiclassification Storage Capability to serve as a repository of data from the Experiments, Events, and Capstones hosted by the ShOC-N FY 2027 procurement funds also supports the United States Air Forces Europe and Africa (U-A) C2 architecture. European Command (EUCOM)/United States Air Forces in Europe (USAFE) requires the ability to detect and track airborne assets across the theater, both friendly and adversarial, and report the status to the EUCOM/North Atlantic Treaty Organization (NATO) leadership chains. The Sensor Fusion and Processing Hub will give USAFE the ability to ingest both partner nation and US sensors to create a Recognizable Air Picture for enhanced Air Domain Awareness and provide an early warning capability. The capability will close multiple gaps that exist across the EUCOM theater with a lack of US-controlled sensors. These funds will procure 4 additional communication nodes across EUCOM to reduce voice and data capability gaps. FY 2027 funding decreased by -9.187 million due to the reduced number of Ground to Air Transmit Receive sites procured in FY 2027. LI 833140 - Strategic Command And Control Air Force UNCLASSIFIED Page 4 of 24 P-1 Line #25 Volume 1 - 200 === page 237 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833140 / Strategic Command And Control Equip / BSA 3: Electronics Programs ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A PE 0303248F, All Domain Common Platform (ADCP) In FY 2027, funds will be used for tech refresh of Application Transformation (AppTx) and Maven Smart Systems (MSS). As part of the AOC modernization path, AppTx integrates legacy on-premise capabilities with emerging cloud-native solutions, and it leverages DoW cloud infrastructure to enhance software delivery pipelines, improve security and configuration enforcement, and ensure mission continuity. Maven Smart System is a commercial off the shelf (COTS) solution that provides Artificial Intelligence (AI)-driven workflows and data connections that enable high functioning cross-platform interoperability for the modern Air Operations Center (AOC), capabilities required for success in Major Theater War and critical to out-pacing adversaries by replacing legacy systems. Funds will also be used for procurement of networking and compute/store equipment required to support distributed and disconnected operations requirements. FY 2026 funding decreases to account for a reduced equipment requirements during ADCP's customers' migration to a cloud-based infrastructure. ADCP FY 2027 funding increased by 0.059 million due to inflationary increases. Overall P-doc funding increases in FY 2027 by 7.019 million due to increased requirements within PE 0101316F, Worldwide Joint Strategic Communications. LI 833140 - Strategic Command And Control Air Force UNCLASSIFIED Page 5 of 24 P-1 Line #25 Volume 1 - 201 === page 238 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 833140 / Strategic Command And Control Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: B-2 Squadrons MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) - 1 1 1 - 1 Gross/Weapon System Cost ($ in Millions) - 0.578 0.589 0.614 - 0.614 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.578 0.589 0.614 - 0.614 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.578 0.589 0.614 - 0.614 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.000 0.000 0.000 0.000 0.000 Gross/Weapon System Unit Cost ($ in Millions) - 0.578 0.589 0.614 - 0.614 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Software - B-2 Squadrons Cost Recurring Cost Solftware Update - - - 0.460 0.460 0.541 0.541 0.580 1 0.580 - - - 0.580 1 0.580 PMA - - - - - 0.118 - - 0.048 0.034 1 0.034 - - - 0.034 1 0.034 - - - - - 0.578 - - 0.589 - - 0.614 - - - - - 0.614 Subtotal: Software - B-2 Squadrons Cost - - - - - 0.578 - - 0.589 - - 0.614 - - - - - 0.614 Gross/Weapon System Cost - - - 0.578 0.578 0.589 0.589 0.614 0.614 - - - 0.614 Subtotal: Recurring Cost 1 1 1 1 1 1 0.614 Remarks: Annual budgets below $600K are normally below the threshold of requiring a P-5A. Gross/Weapon System Cost Unit Cost and Unit Total amounts not listed in Resource Summary Unit Cost/Total Cost section. LI 833140 - Strategic Command And Control Air Force UNCLASSIFIED Page 6 of 24 P-1 Line #25 Volume 1 - 202 === page 239 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 833140 / Strategic Command And Control Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: Worldwide Joint Strategic Communications MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 32.181 45.696 61.818 - 61.818 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 32.181 45.696 61.818 - 61.818 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 32.181 45.696 61.818 - 61.818 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Worldwide Joint Strategic Communications Cost Non Recurring Cost Defense Injection/ Reception Emergency Action Message Command and Control Terminal (DIRECT) Phoenix Air-to-Ground Communications Network (PAGCN)/ - - - 0.271 1 0.271 0.275 1 0.275 0.286 1 0.286 - - - 0.286 1 0.286 - - - 15.955 2 31.910 22.710 2 45.421 18.090 2 36.180 - - - 18.090 2 36.180 - - - - - - - - - 19.876 1 19.876 - - - 19.876 1 19.876 - - - - - - - - - 5.476 1 5.476 - - - 5.476 1 5.476 (†) GEPs Phoenix Air-to-Ground Communications Network (PAGCN)/ MRT2 (†) Phoenix Air-to-Ground Communications Network (PAGCN)/ (†) Test Assets Subtotal: Non Recurring Cost - - - - - 32.181 - - 45.696 - - 61.818 - - - - - 61.818 Subtotal: Hardware Worldwide Joint Strategic Communications Cost - - - - - 32.181 - - 45.696 - - 61.818 - - - - - 61.818 Gross/Weapon System Cost - - - - - 32.181 - - 45.696 - - 61.818 - - - - - 61.818 LI 833140 - Strategic Command And Control Air Force UNCLASSIFIED Page 7 of 24 P-1 Line #25 Volume 1 - 203 === page 240 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 P-1 Line Item Number / Title: 833140 / Strategic Command And Control ID Code (A=Service Ready, B=Not Service Ready) : B (†) Item Number / Title [DODIC]: Worldwide Joint Strategic Communications MDAP/MAIS Code: indicates the presence of a P-5a LI 833140 - Strategic Command And Control Air Force UNCLASSIFIED Page 8 of 24 P-1 Line #25 Volume 1 - 204 === page 241 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 FY Contractor and Location 2025 L3 Harris / Salt Lake City, UT SS / FFP AFMC Dec 2024 Dec 2026 2 15.955 N Sep 2024 2026 L3 Harris / Salt Lake City, UT SS / FFP AFMC Dec 2025 Dec 2027 2 22.710 N Sep 2025 2027 L3 Harris / Salt Lake City, UT SS / FFP AFMC Dec 2026 Dec 2028 2 18.090 N Sep 2026 Phoenix Air-to-Ground Communications Network (PAGCN)/MRT2 2027 L3 Harris / Salt Lake City, UT SS / FFP AFMC Dec 2026 Dec 2028 1 19.876 N Sep 2026 Phoenix Air-to-Ground Communications Network (PAGCN)/Test Assets 2027 L3 Harris / Salt Lake City, UT SS / FFP AFMC Dec 2026 Dec 2028 1 5.476 N Sep 2026 Phoenix Air-to-Ground Communications Network (PAGCN)/GEPs (†) Phoenix Air-to-Ground Communications Network (PAGCN)/GEPs (†) Phoenix Air-to-Ground Communications Network (PAGCN)/GEPs (†) Item Number / Title [DODIC]: Worldwide Joint Strategic Communications Method/Type or Funding Vehicle Cost Elements (†) O O C P-1 Line Item Number / Title: 833140 / Strategic Command And Control Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 833140 - Strategic Command And Control Air Force UNCLASSIFIED Page 9 of 24 P-1 Line #25 Volume 1 - 205 === page 242 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833140 / Strategic Command And Control Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Worldwide Joint Strategic Communications Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Phoenix Air-to-Ground Communications Network (PAGCN)/GEPs 1 2025 AF 2 0 2 1 2026 AF 2 0 2 1 2027 AF 2 0 2 A - - - - - - - - - - - - - - - - - - - - - - 2 A - - - - - - - - - - 2 2 O C T N O V LI 833140 - Strategic Command And Control Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #25 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 206 === page 243 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833140 / Strategic Command And Control Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Worldwide Joint Strategic Communications Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Phoenix Air-to-Ground Communications Network (PAGCN)/GEPs 1 2025 AF 2 0 2 - - 1 2026 AF 2 0 2 - - 1 2027 AF 2 0 2 O C T N O V LI 833140 - Strategic Command And Control Air Force 2 0 - - - - - - - - - - - - A - - - - - - - - - - - - D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 24 S E P O C T N O V 2 0 D E C J A N F E B P-1 Line #25 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 207 2 === page 244 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833140 / Strategic Command And Control Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Worldwide Joint Strategic Communications Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Phoenix Air-to-Ground Communications Network (PAGCN)/GEPs 1 2025 AF 2 2 0 1 2026 AF 2 2 0 1 2027 AF 2 0 2 0 0 O C T N O V LI 833140 - Strategic Command And Control Air Force 2 D E C 0 J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #25 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 208 === page 245 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833140 / Strategic Command And Control Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: Worldwide Joint Strategic Communications Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 L3 Harris - Salt Lake City, UT MSR For 2027 1-8-5 For 2027 MAX For 2027 2 2 2 ALT Prior to Oct 1 ALT After Oct 1 2 Reorder Manufacturing PLT 3 24 Total After Oct 1 ALT Prior to Oct 1 27 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 Remarks: FY 2027 PAGCN Procurement funding will be executed on existing IDIQ contract immediately upon receipt of funds. Site is operational 18-24 months after contract award, pending specific site requirements. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 833140 - Strategic Command And Control Air Force UNCLASSIFIED Page 13 of 24 P-1 Line #25 Volume 1 - 209 0 === page 246 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 833140 / Strategic Command And Control Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Joint All Domain Command & Control (JADC2) MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 15.353 34.772 25.585 - 25.585 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 15.353 34.772 25.585 - 25.585 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 15.353 34.772 25.585 - 25.585 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Joint All Domain Command & Control (JADC2) - ShadowOC Cost Non Recurring Cost Dynamic Mission Replanning (DMR) hardware/software - - - 4.279 1 4.279 - - - - - - - - - - - - - - - 1.284 1 1.284 - - - - - - - - - - - - - - - - - - 2.500 1 2.500 - - - - - - - - - - - - - - - 2.007 1 2.007 - - - - - - - - - - - - - - - - - - 1.233 1 1.233 - - - 1.233 1 1.233 - - - - - - - - - 3.464 1 3.464 - - - 3.464 1 3.464 (†) solutions Instrumentation hardware/software/ support (†) Unclassified Battle Lab for the DevSecOps Environment and Transformational (†) Model DASH events IL-6 Core Network Infrastructure Capital Equipment Refresh (CER) (†) Modernization Multiclassification Storage Capability (†) IL-6 Core Network InfrastructureCapital Equipment Refresh (CER) (†) Modernization LI 833140 - Strategic Command And Control Air Force UNCLASSIFIED Page 14 of 24 P-1 Line #25 Volume 1 - 210 === page 247 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 833140 / Strategic Command And Control Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Joint All Domain Command & Control (JADC2) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Subtotal: Non Recurring Cost - - - - - 5.563 - - 4.507 - - 4.697 - - - - - 4.697 Subtotal: Hardware - Joint All Domain Command & Control (JADC2) ShadowOC Cost - - - - - 5.563 - - 4.507 - - 4.697 - - - - - 4.697 9.790 5.044 30.265 5.222 20.888 - - - 5.222 Hardware - Joint All Domain Command & Control (JADC2) Cost Non Recurring Cost Ground to Air Transmit - - - 4.895 Subtotal: Non Recurring Cost - - - - - 9.790 - - 30.265 - - 20.888 - - - - - 20.888 Subtotal: Hardware - Joint All Domain Command & Control (JADC2) Cost - - - - - 9.790 - - 30.265 - - 20.888 - - - - - 20.888 Gross/Weapon System Cost - - - - - 15.353 - - 34.772 - - 25.585 - - - - - 25.585 (†) Receive (GATR) (†) 2 6 4 4 20.888 indicates the presence of a P-5a LI 833140 - Strategic Command And Control Air Force UNCLASSIFIED Page 15 of 24 P-1 Line #25 Volume 1 - 211 === page 248 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 O O C Cost Elements Dynamic Mission Replanning (DMR) hardware/software solutions (†) Instrumentation hardware/software/ support (†) Unclassified Battle Lab for the DevSecOps Environment and Transformational Model DASH P-1 Line Item Number / Title: 833140 / Strategic Command And Control Item Number / Title [DODIC]: Joint All Domain Command & Control (JADC2) FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) 2025 Palantir / Nellis AFB MIPR N/A Apr 2025 Jul 2025 1 4.279 Y 2025 Aptima / Multiple MIPR N/A May 2025 Aug 2025 1 1.284 Y 2026 Multiple / Nellis AFB, NV Various N/A May 2026 Oct 2027 1 2.500 Y 2026 Dell / Nellis AFB, NV PO N/A Jun 2026 Nov 2027 1 2.007 Y 2027 TBD/Various / Nellis AFB, NV TBD TBD Jan 2027 May 2027 1 1.233 Y 2027 TBD/Various / Nellis AFB, NV TBD TBD Jan 2027 May 2027 1 3.464 Y 2025 Parsons / Charlotte, NC TBD USAFE Nov 2024 Feb 2025 2 4.895 Y 2026 Parsons / Charlotte, NC TBD USAFE Nov 2025 Feb 2026 6 5.044 Y 2027 Parsons / Charlotte, NC TBD USAFE Nov 2026 Feb 2027 4 5.222 Y Qty (Each) RFP Issue Date (†) events IL-6 Core Network Infrastructure Capital Equipment Refresh (CER) (†) Modernization Multiclassification Storage (†) Capability IL-6 Core Network InfrastructureCapital Equipment Refresh (CER) Modernization (†) Ground to Air Transmit Receive (GATR) (†) Ground to Air Transmit Receive (GATR) (†) Ground to Air Transmit Receive (GATR) (†) (†) indicates the presence of a P-21 LI 833140 - Strategic Command And Control Air Force UNCLASSIFIED Page 16 of 24 P-1 Line #25 Volume 1 - 212 === page 249 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833140 / Strategic Command And Control Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Joint All Domain Command & Control (JADC2) Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Dynamic Mission Replanning (DMR) hardware/software solutions 1 2025 AF 1 0 1 0 1 A - - - A - - 1 0 Instrumentation hardware/software/support 2 2025 AF 1 - 1 0 Unclassified Battle Lab for the DevSecOps Environment and Transformational Model DASH events 3 2026 AF 1 0 1 A - - - - - 1 A - - - - 1 IL-6 Core Network Infrastructure Capital Equipment Refresh (CER) Modernization 4 2026 AF 1 0 1 0 1 Multiclassification Storage Capability 5 2027 AF 1 1 IL-6 Core Network InfrastructureCapital Equipment Refresh (CER) Modernization 6 2027 AF 1 0 1 1 Ground to Air Transmit Receive (GATR) 7 2025 AF 2 0 2 7 2026 AF 6 0 6 7 2027 AF 4 0 4 A - - - 1 - - 1 0 A - - - 6 0 4 O C T N O V LI 833140 - Strategic Command And Control Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #25 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 213 === page 250 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833140 / Strategic Command And Control Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Joint All Domain Command & Control (JADC2) Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Dynamic Mission Replanning (DMR) hardware/software solutions 1 2025 AF 1 1 0 0 1 0 0 Instrumentation hardware/software/support 2 2025 AF 1 Unclassified Battle Lab for the DevSecOps Environment and Transformational Model DASH events 3 2026 AF 1 0 1 - - - - - - - - - - - - 1 0 - - - - - - - - - A - - - - 1 0 A - - - - 1 0 IL-6 Core Network Infrastructure Capital Equipment Refresh (CER) Modernization 4 2026 AF 1 0 1 0 1 - - - - 1 0 Multiclassification Storage Capability 5 2027 AF 1 IL-6 Core Network InfrastructureCapital Equipment Refresh (CER) Modernization 6 2027 AF 1 0 1 Ground to Air Transmit Receive (GATR) 7 2025 AF 2 2 0 7 2026 AF 6 6 0 7 2027 AF 4 0 4 0 0 A O C T N O V LI 833140 - Strategic Command And Control Air Force D E C J A N 2 F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 18 of 24 S E P 2 O C T 0 N O V D E C J A N F E B P-1 Line #25 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 214 === page 251 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833140 / Strategic Command And Control Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: Joint All Domain Command & Control (JADC2) Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Palantir - Nellis AFB 1 1 1 1 7 3 10 0 0 0 0 2 Aptima - Multiple 1 1 1 1 8 3 11 0 0 0 0 3 Multiple - Nellis AFB, NV 1 1 1 1 8 17 25 0 0 0 0 4 Dell - Nellis AFB, NV 1 1 1 1 9 17 26 0 0 0 0 5 TBD/Various - Nellis AFB, NV 1 1 1 1 4 4 8 0 0 0 0 6 TBD/Various - Nellis AFB, NV 1 1 1 1 4 4 8 0 0 0 0 7 Parsons - Charlotte, NC 1 2 2 2 2 3 5 0 0 0 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 833140 - Strategic Command And Control Air Force UNCLASSIFIED Page 19 of 24 P-1 Line #25 Volume 1 - 215 === page 252 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 833140 / Strategic Command And Control Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: All Domain Common Platform MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 5.368 1.855 1.914 - 1.914 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 5.368 1.855 1.914 - 1.914 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 5.368 1.855 1.914 - 1.914 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - All Domain Common Platform Cost Non Recurring Cost Tech Refresh (†) - - - 5.368 Subtotal: Non Recurring Cost - - - - Subtotal: Hardware - All Domain Common Platform Cost - - - Gross/Weapon System Cost - - - Materials (†) 1 5.368 1.855 - 5.368 - - - 5.368 - - 5.368 1 1.855 1.914 - 1.855 - - - 1.855 - - 1.855 1 1.914 - - - 1.914 1 1.914 - 1.914 - - - - - 1.914 - - 1.914 - - - - - 1.914 - - 1.914 - - - - - 1.914 indicates the presence of a P-5a LI 833140 - Strategic Command And Control Air Force UNCLASSIFIED Page 20 of 24 P-1 Line #25 Volume 1 - 216 === page 253 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (†) O O C P-1 Line Item Number / Title: 833140 / Strategic Command And Control FY Contractor and Location Method/Type or Funding Vehicle Item Number / Title [DODIC]: All Domain Common Platform Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) Tech Refresh Materials (†) 2025 Various / Various Various Hanscom AFB May 2025 Jun 2025 1 5.368 Y Tech Refresh Materials (†) 2026 Various / Various Various Hanscom AFB Jan 2026 Feb 2026 1 1.855 Y Tech Refresh Materials (†) 2027 TBD / Various TBD Hanscom AFB Apr 2027 Jun 2027 1 1.914 Y RFP Issue Date indicates the presence of a P-21 LI 833140 - Strategic Command And Control Air Force UNCLASSIFIED Page 21 of 24 P-1 Line #25 Volume 1 - 217 === page 254 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833140 / Strategic Command And Control Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: All Domain Common Platform Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Fiscal Year 2026 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Tech Refresh Materials 1 2025 AF 1 0 1 1 2026 AF 1 0 1 2 2027 AF 1 0 1 A - 1 0 A - 1 0 1 O C T N O V LI 833140 - Strategic Command And Control Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 22 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #25 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 218 === page 255 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833140 / Strategic Command And Control Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: All Domain Common Platform Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Tech Refresh Materials 1 2025 AF 1 1 0 1 2026 AF 1 1 0 2 2027 AF 1 0 1 0 0 A O C T N O V LI 833140 - Strategic Command And Control Air Force D E C J A N F E B M A R A P R M A Y 1 J U N 0 J U L A U G UNCLASSIFIED Page 23 of 24 S E P O C T N O V D E C J A N F E B P-1 Line #25 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 219 === page 256 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833140 / Strategic Command And Control Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: All Domain Common Platform Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 1 1 1 Various - Various 2 TBD - Various ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 0 0 0 0 0 0 0 0 1 7 2 9 0 0 0 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 833140 - Strategic Command And Control Air Force UNCLASSIFIED Page 24 of 24 P-1 Line #25 Volume 1 - 220 === page 257 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833160 / Cheyenne Mountain Complex Equip / BSA 3: Electronics Programs ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0305903F Other Related Program Elements: 0305903F Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - 56.510 8.028 22.021 7.434 - 7.434 7.633 7.815 8.001 8.201 0.000 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) - - - - - - - - - - - 56.510 8.028 22.021 7.434 - 7.434 7.633 7.815 8.001 8.201 0.000 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) To FY 2031 Complete - - - - - - - - - - - 56.510 8.028 22.021 7.434 - 7.434 7.633 7.815 8.001 8.201 0.000 Total 125.643 125.643 125.643 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Cheyenne Mountain Complex (CMC) systems provide real-time ballistic missile warning, air defense, force management, battle management and command, control and communications for the North American Air Defense (NORAD) missions. PE 0305903F - Mobile Command and Control System (MC2S) Modification for the COMBATANT COMMANDER (CCDR), Mobile Command and Control System (MC2S); The CCDR's MC2S provides command capabilities to accomplish directed missions in the event of a national level emergency. It provides resilient command, control, communications, computers, and intelligence (C4I) capability accomplishing directed COCOM missions. The MC2S provides C4I for Homeland Support/Homeland Defense (HLS/HLD) and U.S. Northern Command (USNORTHCOM). MC2S Mod 08 Block 06 will execute MC2S Block 06 modifications which include but are not limited to: 1) Communication system upgrades; 2) Mission and support asset upgrades; 3) Cyber security modernization; 4) Network upgrades; 5) Environmental and Filtration system upgrades along with and including initial spares and test facility updates required by the fielding of these modifications. FY26 increase is funding efforts to include Integrated Base Defense Security System (IBDSS) which is a replacement of security system components (intrusion detection system, access control system, closed-circuit television system, annunciator, cameras, sensors) for the MC2S in-garrison location at the 253 CACG on F.E. Warren AFB and a funding increase for classified effort and can be addressed via proper classification channels. Decrease to FY27 levels is a return to baseline funding profile. MC2S Mod 09 Block 07 will execute MC2S Block 07 modifications which include but are not limited to: 1) Communication system upgrades; 2) Mission and support asset upgrades; 3) Cyber security modernization; 4) Network upgrades; 5) Environmental and Filtration system upgrades along with and including initial spares and test facility updates required by the fielding of these modifications. MC2S Block 08 modifications include but are not limited to: 1) Communication system upgrades; 2) Mission and support asset upgrades; 3) Cyber security modernization; 4) Network upgrades; 5) Environmental and Filtration system upgrades along with and including initial spares and test facility updates required by the fielding of these modifications. Due to the limited spares demand rate and indefinite system lifespan, Life of Type buys may be required to support weapon system modifications across the active MC2S Block Programs. Additionally, program will fund PMA support for the MC2S Block 08 program. PMA costs fund acquisition support strategy as well as engineering and technical expertise associated with procurement activities. In addition, PMA costs will also support equipment test, travel, and other program related costs associated with install of procurement equipment. Funding for this effort is in Program Element 0305903F and is funded under IAW full funding policy. Block 08 is a continuation of Block 07. LI 833160 - Cheyenne Mountain Complex Air Force UNCLASSIFIED Page 1 of 5 P-1 Line #26 Volume 1 - 221 === page 258 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833160 / Cheyenne Mountain Complex Equip / BSA 3: Electronics Programs ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0305903F Other Related Program Elements: 0305903F Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-3a 008 / Mobile Command and Control Systems Upgrade Block 06 (Reliability & Maintainability) P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code B Exhibits Schedule Exhibit Type Title* P-3a 008 / Mobile Command and Control Systems Upgrade Block 06 (Reliability & Maintainability) P-40 Total Gross/Weapon System Cost Subexhibits ID CD B MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 0.000 - / 8.028 - / 22.021 - / 7.434 - / 56.510 - / 8.028 - / 22.021 - / 7.434 - / 0.000 - / - - / 7.434 / 7.434 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 0.000 - / 7.633 - / / 7.815 - / / 8.001 - / / 8.201 - / - - / 37.483 / 0.000 - / 125.643 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: PE 0305903F - Mobile Command and Control System (MC2S) FY 2027 justification is provided on applicable P-3As. The CCDR's Mobile Command and Control System (MC2S) provides a resilient command, control, communications, computers, intelligence (C4I), reliability and maintainability capability while accomplishing directed COCOM missions. MC2S provides C4I for Homeland Security Support/Homeland Defense (HLS/HLD) and USNORTHCOM missions. MC2S modification efforts funded in this line include upgrading MC2S shelters and incorporating additional C4I system capabilities via mobile Information Technology and Communication Upgrade projects; ensuring the platform's ability to rapidly deploy, re-constitute and operate. Different blocks do not signify a new start but rather is an internal tracking system. Blocks 06 and 07 modifications will include but are not limited to: 1) Communication system upgrades; 2) Mission and support asset upgrades; 3) Cyber security modernization, 4) Network upgrades; and 5) Environmental and Filtration system upgrades along with and including initial spares and test facility updates required by the fielding of these modification. Due to the limited spares demand rate, and indefinite system lifespan, Life of Type buys may be required to support weapons system modifications across the active MC2S Block Programs. Program funding will also provide Program Management Administration (PMA) support for the MC2S Block 06 and Block 07 Programs. PMA includes acquisition support/strategy, engineering and technical expertise associated with procurement; support services, test, travel and other program related costs associated with install of procurement equipment. MC2S Block 06 will execute MC2S Block 06 modifications which include but are not limited to: 1) Communication system upgrades; 2) Mission and support asset upgrades; 3) Cyber security modernization; 4) Network upgrades; 5) Environmental and Filtration system upgrades along with and including initial spares and test facility updates required by the fielding of these modifications. Block 06 will also execute PMA acquisition support/strategy, engineering and technical expertise associated with procurement; support services, test, travel and other program related costs associated with install of procurement equipment. LI 833160 - Cheyenne Mountain Complex Air Force UNCLASSIFIED Page 2 of 5 P-1 Line #26 Volume 1 - 222 === page 259 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 P-1 Line Item Number / Title: 833160 / Cheyenne Mountain Complex ID Code (A=Service Ready, B=Not Service Ready) : B Resource Summary MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - - 0.000 8.028 22.021 7.434 0.000 7.434 0.000 - - - - 37.483 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) To FY 2031 Complete Total - - - - - - - - - - - - 0.000 8.028 22.021 7.434 0.000 7.434 0.000 - - - - 37.483 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 008 / Mobile Command and Control Systems Upgrade Block 06 - - - - - - - - - - - - 0.000 8.028 22.021 7.434 0.000 7.434 0.000 - - - - 37.483 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: COMBATANT COMMANDER (COCOM) Mobile Command and Control System (MC2S): The COCOM's MC2S provides a resilient command, control, communications, computers, intelligence (C4I), reliability and maintainability capability while accomplishing directed COCOM missions. The MC2S provides C4I for Homeland Security Support/Homeland Defense (HLS/HLD) and USNORTHCOM missions. MC2S modification efforts funded in this line include upgrading MC2S shelters and incorporating additional C4I systems capabilities via mobile Information Technology and Communication Upgrade projects; ensuring the platform's ability to rapidly deploy, re-constitute and operate. FY 2026 efforts will continue to fund MC2S Block 06 modifications. MC2S Block 06 modifications include but are not limited to increased requirements in: 1) Communication system upgrades; 2) Mission and support asset upgrades; 3) Cyber security modernization; 4) Network upgrades; 5) Environmental and Filtration system upgrades along with and including initial spares and test facility updates required by the fielding of these modifications. Due to the limited spares demand rate and indefinite system lifespan, Life of Type buys may be required to support weapon system modifications across the active MC2S Block Programs. Additionally, FY 2026 will fund PMA support for the MC2S Block 06 program initiated with FY2024 funding. PMA costs fund acquisition support strategy as well as engineering and technical expertise associated with procurement activities. In addition, PMA costs will also support equipment test, travel, and other program related costs associated with install of procurement equipment. Funding for this effort is in Program Element 0305903F and is funded IAW full funding policy. Block 06 is a continuation of Block 05. In addition to FY26, critical efforts include Integrated Base Defense Security System (IBDSS) which is a replacement of security system components (intrusion detection system, access control system, closed-circuit television system, annunciator, cameras, sensors) for the MC2S in-garrison location at the 253 CACG on F.E. Warren AFB. Funding for this effort is in program element 0305903F and is funded under IAW full funding policy. FY 2027 efforts will continue to fund MC2S Block 06 modifications as listed above with the exception of IBDSS requirement. Milestone/Development Status System is in operations and sustainment with no system development activities. LI 833160 - Cheyenne Mountain Complex Air Force UNCLASSIFIED Page 3 of 5 P-1 Line #26 Volume 1 - 223 === page 260 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 833160 / Cheyenne Mountain Complex Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : B MDAP/MAIS Code: Modification Type: Reliability & Maintainability Models of Systems Affected: CheyenneMountainComplex Prior Years Financial Plan Modification Number / Title: 008 / Mobile Command and Control Systems Upgrade Block 06 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: MC2S (7) B Kits Recurring MC2S:EQUIPMENT Group B (Active) - / - 1 / 3.853 - / - 1 / 3.853 - / - - / - - / - - / - - / - - / - - / 5.612 - / 9.572 - / 3.853 - / - - / 3.853 - / - - / - - / - - / - - / - - / 19.037 - / - - / 5.612 - / 9.572 - / 3.853 - / - - / 3.853 - / - - / - - / - - / - - / - - / 19.037 - / - - / 5.612 - / 9.572 - / 3.853 - / - - / 3.853 - / - - / - - / - - / - - / - - / 19.037 GROUP B: TOTAL NONRECURRING - / - / - - / 8.931 / - - / - / - - / - - / - - / - - / - - / - - PMA - Contractor Services - / - - / 0.709 - / 1.774 - / 1.800 - / - - / 1.800 - / - - / - - / - - / - - / - - - / - - / 0.709 / 10.705 - / 1.800 - / - - / 1.800 - / - - / - - / - - / - - / - Modification Item 1 of 1: MC2S (7) - / - 1 / 1.707 1 / 1.744 1 / 1.781 - / - 1 / 1.781 - / - - / - - / - - / - - / - 3 / 5.232 Subtotal: Installation - / - 1 / 1.707 1 / 1.744 1 / 1.781 - / - 1 / 1.781 - / - - / - - / - - / - - / - 3 / 5.232 0.000 8.028 22.021 7.434 0.000 7.434 - 37.483 Subtotal: Recurring Subtotal: MC2S (7) Subtotal: Procurement, All Modification Items 1 / 5.612 1 / 9.572 3 / 19.037 Support (All Modification Items) Subtotal: Support - - - - - / 8.931 / 4.283 / 13.214 Installation Total Total Cost (Procurement + Support + Installation) LI 833160 - Cheyenne Mountain Complex Air Force UNCLASSIFIED Page 4 of 5 0.000 - P-1 Line #26 - - Volume 1 - 224 === page 261 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 833160 / Cheyenne Mountain Complex Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: 008 / Mobile Command and Control Systems Upgrade Block 06 MDAP/MAIS Code: Modification Item 1 of 1: MC2S (7) Manufacturer Information Manufacturer Name: L-3 National Security Solution, Inc Manufacturer Location: Albuquerque, NM Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 8 Dates FY 2025 FY 2026 FY 2027 Contract Dates Jan 2025 Jan 2026 Jan 2027 Delivery Dates Sep 2025 Sep 2026 Sep 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Contract Field Team Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - 1 / 1.707 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 1.707 FY 2026 - / - - / - 1 / 1.744 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 1.744 FY 2027 - / - - / - - / - 1 / 1.781 - / - 1 / 1.781 - / - - / - - / - - / - - / - 1 / 1.781 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - 1 / 1.707 1 / 1.781 - / - 1 / 1.781 - / - - / - - / - - / - - / - 3 / 5.232 1 / 1.744 / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 0 - - 1 - - - 1 - - - 1 - - - - - - - - - - - - - - - - - 0 3 Out 0 - - 1 - - - 1 - - - 1 - - - - - - - - - - - - - - - - - 0 3 LI 833160 - Cheyenne Mountain Complex Air Force UNCLASSIFIED Page 5 of 5 P-1 Line #26 Volume 1 - 225 === page 262 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 226 === page 263 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833170 / Mission Planning Systems Equip / BSA 3: Electronics Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0208006F Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 12.646 18.474 18.722 23.927 - 23.927 19.962 20.340 20.717 21.130 - - - - - - - - - - - - 12.646 18.474 18.722 23.927 - 23.927 19.962 20.340 20.717 21.130 - - - - - - - - - - - - 12.646 18.474 18.722 23.927 - 23.927 19.962 20.340 20.717 21.130 - Total 155.918 155.918 155.918 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The Mission Planning Systems (MPS) Hardware program includes two main efforts; (1) in support of MPS software development and (2) in support of Precision Airdrop System (PADS) development sustainment, and modernization. The program equips U.S. Air Force (USAF) Active Duty, Air National Guard, and Air Force Reserve flying units with hardware required for mission planning and airdrop operations. 1. MPS HARDWARE: Equips USAF operational flying units with hardware required to perform mission planning and integrate information with aircraft data transfer device systems. Aircraft supported include: Air Combat Command (ACC): F-15, F-16, F-22, F-35, A-10, E-3, E-4, E-7, RC/OC-135, HH-60, HC-130, EC-130, U-2, RQ-4, EA-37 Air Mobility Command (AMC): C-5, C-17, C-130, KC-10, KC-135, KC-46 Air Force Global Strike Command (AFGSC): B-1, B-2, B-21, B-52, UH-1 Air Education and Training Command (AETC): T-38, T-7A, T-1, T-6 MPS provides a mission data management system that seamlessly interfaces with other planning systems and aircraft avionics, offering a flexible, configurable, and cost-effective range of capabilities to meet peacetime, contingency, and wartime planning needs. Mission planning enables aircrews and planners to electronically receive mission information, such as tasking orders, intelligence data, target coordinates, imagery, and other relevant details from USAF Command, Control, Computers, Communications, Cyber, Intelligence, Surveillance, Reconnaissance, Position, Navigation, and Timing (C5ISRC-PNT) systems. The information is used to prepare mission plans that include data for equipment and personnel airdrop, weapons planning, maps, charts, imagery, flight logs, radar predictions, and navigation. The data is electronically transferred to the aircraft and/or precision-guided weapons. Streamlining mission planning and data transfer helps increase sortie rates, improve aircrew and aircraft survivability, and enhance aircrew readiness. This hardware and software combination enables aircrews and planners to plan safe and effective operational missions in a timely manner. As the mission planning enterprise modernizes into an open mission systems architecture, the program will provide end items that support enterprise infrastructure, software development, and deployment. The mission planning hardware includes essential equipment such as commercial-based personal computers (PCs), laptops, tablets, printers, storage devices, servers, displays, peripherals, software, software licenses, and support services. By leveraging technological advancements, the program enables high-end computing on smaller, mission-oriented devices that provide the necessary availability, survivability, processing power, and memory for modern mission planning. The design requirements balance performance with portability, ensuring the program evolves alongside software modernization efforts. These assets LI 833170 - Mission Planning Systems Air Force UNCLASSIFIED Page 1 of 10 P-1 Line #27 Volume 1 - 227 === page 264 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833170 / Mission Planning Systems Equip / BSA 3: Electronics Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0208006F Line Item MDAP/MAIS Code: N/A provide aircrews with a portable, customizable, available, survivable, and network-capable system that integrates with mission planning software and ensures data interoperability with C4ISRC-PNT systems. Additionally, components can be networked and tailored to support specific mission planning environments. Changes in aircraft and weapons deployment, along with evolving operational concepts, continuously shape mission planning hardware requirements, necessitating adaptive system design and procurement. To address Diminishing Manufacturing Source (DMS) issues, MPS hardware is procured on a four-year life-cycle replacement schedule, with centralized management post-acquisition. All equipment will be centrally managed and distributed by the Mission Planning Systems Support Facility (MPSSF) and the Defense Logistics Agency (DLA). 2. Precision Airdrop System (PADS) enables precision airdrop for logistical resupply and the delivery of diverse payloads including Palletized Effects. Key hardware components for procurement include Antenna Control Units (ACUs), Ultra High Frequency Receivers (UHFs), Modular Air Guidance Units (MAGUs), and dropsondes. PADS delivers cargo accurately using ACUs and UHFs for guidance and communication, while MAGUs steer cargo precisely with on-board intelligence. Dropsondes provide real-time weather data, enabling optimal precision. Dropsondes provide real-time weather data, enabling optimal precision. Replacement of outdated Block 3.0 (UHFs and ACUs) systems with Block 4.1 systems (each consisting of one ACU and one UHF) is required to maintain compliance with Department of War (DoW) standards and address parts obsolescence. Essential for precision airdrop operations, these components are designed for roll-on/roll-off functionality where they can be easily loaded and unloaded from aircraft as needed for precision airdrop operations. AMC requires 170 new systems (163 replacements and 7 spares), totaling 340 subsystems (1 ACU and 1 UHF per system), by FY2028 to replace aging equipment and ensure mission readiness for precision airdrop. The upgrade is required to keep mobility aircraft equipped with reliable, repairable, and compliant equipment for precision airdrop capabilities. Costs for ACUs and UHFs average 40 thousand and 120 thousand per unit respectively. Cost increases each year are driven by rising production costs and parts obsolescence. The requested funding for FY2027 will support the ongoing modernization and readiness of our airdrop capabilities. Upgrading to Block 4.1 PADS systems (ACUs and UHFs) is necessary to ensure our aircraft can continue to perform these vital missions in compliance with Military Standard (MILSTD)-810H and MIL-STD-704F requirements, and Operational Safety, Suitability, and Effectiveness (OSS&E) requirements in Air Force Materiel Command Instruction (AFMCI) 63-1201. Additionally, FY2027 funding will procure essential PADS hardware to sustain operational readiness. To ensure successful fielding and system execution, the following items are also required: systems required for prototyping, testing, evaluation, demonstrations; portable data storage units; engineering/technical support; equipment storage; associated hardware warranties; and components for technical refreshes and Diminishing Manufacturing Source & Material Shortage (DMSMS) resolutions. Lastly, there are associated costs for testing upgraded hardware to ensure form, fit, function, and capabilities. Systems include parachute suspended guided/unguided and powered/unpowered delivery vehicles (e.g., drones, para-gliders). This funding request will continue to support potential solutions to address DMS and obsolescence, to include if optimal, life of type buys or bridge buys limited to the program of record quantity. Funding for this exhibit contained in program element 0208006F. LI 833170 - Mission Planning Systems Air Force UNCLASSIFIED Page 2 of 10 P-1 Line #27 Volume 1 - 228 === page 265 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833170 / Mission Planning Systems Equip / BSA 3: Electronics Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0208006F Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Mission Planning Systems P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 12.646 - / 18.474 - / 18.722 - / 23.927 - / - - / 23.927 - / 12.646 - / 18.474 - / 18.722 - / 23.927 - / - - / 23.927 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: 1. MPS HARDWARE: Equips USAF operational flying units with hardware required to perform mission planning and integrate information with aircraft data transfer device systems. Aircraft supported include: Air Combat Command (ACC): F-15, F-16, F-22, F-35, A-10, E-3, E-4, E-7, RC/OC-135, HH-60, HC-130, EC-130, U-2, RQ-4, EA-37 Air Mobility Command (AMC): C-5, C-17, C-130, KC-10, KC-135, KC-46 Air Force Global Strike Command (AFGSC): B-1, B-2, B-21, B-52, UH-1 Air Education and Training Command (AETC): T-38, T-7A, T-1, T-6 MPS provides a mission data management system that seamlessly interfaces with other planning systems and aircraft avionics, offering a flexible, configurable, and cost-effective range of capabilities to meet peacetime, contingency, and wartime planning needs. Mission planning enables aircrews to electronically receive mission information, such as tasking orders, intelligence data, target coordinates, imagery, and other relevant details from USAF Command, Control, Communications, Computers, and Intelligence (C4I) systems. The information is used to prepare mission plans that include data for equipment and personnel airdrop, weapons planning, maps, charts, imagery, flight logs, radar predictions, and navigation. The data is electronically transferred to the aircraft and/or precision-guided weapons. Streamlining mission planning and data transfer helps increase sortie rates, improve aircrew and aircraft survivability, and enhance aircrew readiness. This hardware and software combination enables aircrews and planners to plan safe and effective operational missions in a timely manner. As the mission planning enterprise modernizes into an open mission systems architecture, the program will provide end items that support enterprise infrastructure, software development, and deployment. The mission planning hardware includes essential equipment such as commercial-based personal computers (PCs), laptops, tablets, printers, storage devices, servers, displays, peripherals, software, software licenses, and support services. By leveraging technological advancements, the program enables high-end computing on smaller, mission-oriented devices that provide the necessary availability, survivability, processing power, and memory for modern mission planning. The design requirements balance performance with portability, ensuring the program evolves alongside software modernization efforts. These assets provide aircrews with a portable, customizable, and network-capable system that integrates with mission planning software and ensures data interoperability with C4I systems. Additionally, components can be networked and tailored to support specific mission planning environments. Changes in aircraft and weapons deployment, along with evolving operational concepts, continuously shape mission planning hardware requirements, necessitating adaptive system design and procurement. To address Diminishing Manufacturing Source (DMS) issues, MPS hardware is procured on a four-year life-cycle replacement schedule, with centralized management post-acquisition. All equipment will be centrally managed and distributed by the Mission Planning Systems Support Facility (MPSSF) and the Defense Logistics Agency (DLA). 2. Precision Airdrop System (PADS) Precision Airdrop System (PADS) enables precision airdrop for logistical resupply and the delivery of diverse payloads including Palletized Effects. LI 833170 - Mission Planning Systems Air Force UNCLASSIFIED Page 3 of 10 P-1 Line #27 Volume 1 - 229 === page 266 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833170 / Mission Planning Systems Equip / BSA 3: Electronics Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0208006F Line Item MDAP/MAIS Code: N/A Key hardware components for procurement include Antenna Control Units (ACUs), Ultra High Frequency Receivers (UHFs), Modular Air Guidance Units (MAGUs), and dropsondes. PADS delivers cargo accurately using ACUs and UHFs for guidance and communication, while MAGUs steer cargo precisely with on-board intelligence. Dropsondes provide real-time weather data, enabling optimal precision. Replacement of outdated Block 3.0 (UHFs and ACUs) systems with Block 4.1 systems (each consisting of one ACU and one UHF) is required to maintain compliance with Department of War (DoW) standards and address parts obsolescence. Essential for precision airdrop operations, these components are designed for roll-on/roll-off functionality where they can be easily loaded and unloaded from aircraft as needed for precision airdrop operations. AMC requires 170 new systems (163 replacements and 7 spares), totaling 340 subsystems (1 ACU and 1 UHF per system), by FY2028 to replace aging equipment and ensure mission readiness for precision airdrop. The upgrade is required to keep mobility aircraft equipped with reliable, repairable, and compliant equipment for precision airdrop capabilities. Costs for ACUs and UHFs average 40 thousand and 120 thousand per unit respectively. Cost increases each year are driven by rising production costs and parts obsolescence. The requested funding for FY2027 will support the ongoing modernization and readiness of our airdrop capabilities. Upgrading to Block 4.1 PADS systems (ACUs and UHFs) is necessary to ensure our aircraft can continue to perform these vital missions in compliance with Military Standard (MILSTD)-810H and MIL-STD-704F requirements, and Operational Safety, Suitability, and Effectiveness (OSS&E) requirements in Air Force Materiel Command Instruction (AFMCI) 63-1201. Additionally, FY2027 funding will procure essential PADS hardware to sustain operational readiness. To ensure successful fielding and system execution, the following items are also required: systems required for prototyping, testing, evaluation, demonstrations; portable data storage units; engineering/technical support; equipment storage; associated hardware warranties; and components for technical refreshes and Diminishing Manufacturing Source & Material Shortage (DMSMS) resolutions. Lastly, there are associated costs for testing upgraded hardware to ensure form, fit, function, and capabilities. Systems include parachute suspended guided/unguided and powered/unpowered delivery vehicles (e.g., drones, para-gliders). 3. PROGRAM SUPPORT COSTS: FY2027 funding provides program office, engineering, and other contractor support for the MPS and PADS procurement program. LI 833170 - Mission Planning Systems Air Force UNCLASSIFIED Page 4 of 10 P-1 Line #27 Volume 1 - 230 === page 267 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 833170 / Mission Planning Systems Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Mission Planning Systems MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 12.646 18.474 18.722 23.927 - 23.927 - - - - - - 12.646 18.474 18.722 23.927 - 23.927 - - - - - - 12.646 18.474 18.722 23.927 - 23.927 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Mission Planning Systems Cost Recurring Cost MPS Hardware (†) 9.625 1 9.625 10.413 1 10.413 10.510 1 10.510 15.370 1 15.370 - - - 15.370 1 15.370 MPS JPADS Antenna Control 0.040 19 0.760 0.044 23 1.008 0.043 39 1.677 0.043 40 1.720 - - - 0.043 40 1.720 0.119 19 2.261 0.129 23 2.976 0.126 39 4.930 0.127 40 5.080 - - - 0.127 40 5.080 PADS Systems Engineering & Logistical Support - - - - - 0.976 - - 1.006 - - 1.006 - - - - - 1.006 PADS Support Services - - - - - 0.601 - - 0.599 - - 0.751 - - - - - 0.751 (†) - - - 2.500 2.500 - - - - - - - - - - - - Unit (†) MPS JPADS - Ultra High Frequency (†) Receivers Dropsonde Tech Refresh 1 Subtotal: Recurring Cost - - 12.646 - - 18.474 - - 18.722 - - 23.927 - - - - - 23.927 Subtotal: Hardware - Mission Planning Systems Cost - - 12.646 - - 18.474 - - 18.722 - - 23.927 - - - - - 23.927 Gross/Weapon System Cost - - 12.646 - - 18.474 - - 18.722 - - 23.927 - - - - - 23.927 (†) indicates the presence of a P-5a LI 833170 - Mission Planning Systems Air Force UNCLASSIFIED Page 5 of 10 P-1 Line #27 Volume 1 - 231 === page 268 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 FY Contractor and Location (†) 2024 Multiple / Multiple Various AFLCMC Hanscom AFB (†) 2025 Multiple / Multiple Various AFLCMC Hanscom AFB Jun 2025 Apr 2026 1 10.413 Y (†) 2026 Multiple / Multiple Various AFLCMC Hanscom AFB Nov 2025 Aug 2027 1 10.510 Y (†) MPS Hardware 2027 Multiple / Multiple Various AFLCMC Hanscom AFB Nov 2026 Aug 2027 1 15.370 Y MPS JPADS - Antenna Control Unit 2025 QinetiQ / West Virginia MIPR AFLCMC Hanscom AFB Jun 2025 Jun 2026 23 0.044 Y MPS JPADS - Antenna Control Unit 2026 QinetiQ / West Virginia MIPR AFLCMC Hanscom AFB Jun 2026 Jun 2027 39 0.043 Y MPS JPADS - Antenna Control Unit 2027 QinetiQ / West Virginia MIPR AFLCMC Hanscom AFB Jun 2027 Jun 2028 40 0.043 Y 2024 QinetiQ / West Virginia MIPR AFLCMC Hanscom AFB Jun 2024 Jun 2025 19 0.119 Y 2025 QinetiQ / West Virginia MIPR AFLCMC Hanscom AFB Jun 2025 Jun 2026 23 0.129 Y 2026 QinetiQ / West Virginia MIPR AFLCMC Hanscom AFB Jun 2026 Jun 2027 39 0.126 Y 2027 QinitiQ / West Virginia MIPR AFLCMC Hanscom AFB Jun 2027 Jun 2028 40 0.127 Y 2025 Multiple / Multiple Various AFLCMC Hanscom AFB Jun 2025 Jun 2026 1 2.500 Y MPS Hardware MPS Hardware MPS Hardware MPS JPADS - Ultra High (†) Frequency Receivers MPS JPADS - Ultra High (†) Frequency Receivers MPS JPADS - Ultra High (†) Frequency Receivers MPS JPADS - Ultra High (†) Frequency Receivers Dropsonde Tech Refresh (†) Item Number / Title [DODIC]: Mission Planning Systems Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 833170 / Mission Planning Systems Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) May 2024 Aug 2025 1 9.625 Y Qty (Each) RFP Issue Date Apr 2022 Jul 2022 Jul 2022 indicates the presence of a P-21 Remarks: Minor increase in unit cost due to inflation. LI 833170 - Mission Planning Systems Air Force UNCLASSIFIED Page 6 of 10 P-1 Line #27 Volume 1 - 232 === page 269 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833170 / Mission Planning Systems Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Mission Planning Systems Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P MPS Hardware 1 2024 AF 1 0 1 1 2025 AF 1 0 1 A - - - - - - - - - - - - - - - A - - 1 0 1 2026 AF 1 0 1 1 1 2027 AF 1 0 1 1 - - 1 MPS JPADS - Ultra High Frequency Receivers 2 2024 AF 19 0 19 2 2025 AF 23 0 23 2 2026 AF 39 0 39 3 2027 AF 40 0 40 A - - - - - - - - - - - - 19 0 A - - - - 23 39 40 O C T LI 833170 - Mission Planning Systems Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #27 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 233 === page 270 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833170 / Mission Planning Systems Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Mission Planning Systems Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P MPS Hardware 1 2024 AF 1 1 0 1 2025 AF 1 0 1 1 2026 AF 1 0 1 1 2027 AF 1 0 1 0 - - - - - - A - - - - - 1 0 - - - - - - - - - - - - - - - - 1 0 A - - - - - - - - - 1 0 MPS JPADS - Ultra High Frequency Receivers 2 2024 AF 19 19 0 2 2025 AF 23 0 23 2 2026 AF 39 0 39 3 2027 AF 40 0 40 0 - - - - - - - - 23 0 A - - - - - - - - - - - - 39 0 A O C T LI 833170 - Mission Planning Systems Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #27 M A R A P R M A Y J U N J U L A U G - 40 S E P Volume 1 - 234 === page 271 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833170 / Mission Planning Systems Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Mission Planning Systems Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E MPS Hardware 1 2024 AF 1 1 0 0 1 2025 AF 1 1 0 0 1 2026 AF 1 1 0 0 1 2027 AF 1 1 0 0 MPS JPADS - Ultra High Frequency Receivers 2 2024 AF 19 19 0 0 2 2025 AF 23 23 0 0 2 2026 AF 39 39 0 3 2027 AF 40 0 40 0 O C T LI 833170 - Mission Planning Systems Air Force N O V D E C J A N F E B M A R A P R M A Y 40 J U N 0 J U L A U G UNCLASSIFIED Page 9 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #27 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 235 === page 272 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833170 / Mission Planning Systems Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Item Number / Title [DODIC]: Mission Planning Systems Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Multiple - Multiple MSR For 2027 1-8-5 For 2027 MAX For 2027 1 1 1 2 QinetiQ - West Virginia 3 QinitiQ - West Virginia 40 40 40 ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 0 0 0 0 1 2 9 0 0 0 0 0 0 0 11 0 0 0 0 0 40 9 12 21 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 833170 - Mission Planning Systems Air Force UNCLASSIFIED Page 10 of 10 P-1 Line #27 Volume 1 - 236 === page 273 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833570 / Strategic Mission Planning & Execution System Equip / BSA 3: Electronics Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 2.484 7.376 6.383 9.435 - 9.435 7.473 10.076 10.268 10.473 - 63.968 Total - - - - - - - - - - - - 2.484 7.376 6.383 9.435 - 9.435 7.473 10.076 10.268 10.473 - 63.968 - - - - - - - - - - - - 2.484 7.376 6.383 9.435 - 9.435 7.473 10.076 10.268 10.473 - 63.968 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: This budget line funds Strategic Mission Planning and Execution System (SMPES) Program Element (PE). Legacy PEs 0101324F Integrated Strategic Planning & Analysis Network (ISPAN) and 0301112F Nuclear Planning & Execution System (NPES) / National Leadership Command Capability (NLCC) Decision Support Service (DSS) have been consolidated into one SMPES PE 0304100F. SMPES is an integrated enterprise solution software system providing the U.S. Air Force (USAF) and U.S. strategic nuclear forces' principal nuclear planning and analysis tools; including tools for consequence analysis and deliberate, adaptive, and crisis action planning for strategic deterrence. SMPES consolidates the following six independently managed programs into one system: 1) Mission Planning and Analysis System (MPAS); 2) Global Adaptive Planning Collaborative Information Environment (GAP-CIE); 3) NLCC DSS - Nuclear Command and Control (NC2) conference module component; 4) NPES Recapitalization (NPES Recap); 5) Force Status Readiness (FSR); and 6) Force Survivability Analysis and Management (FSAM). SMPES includes automated data processing equipment (ADPE); multiple networks; software, training, and associated deployable and distributed data processing nodes; a test/development environment; and subsidiary systems. SMPES develops software to facilitate Nuclear Command and Control (NC2) adaptive planning and execution at fixed and mobile sites in real time, and provides communication interfaces with software development, data management, software re-engineering, and operations to include requirements validation and training (formerly known as Nuclear Planning and Execution System Recapitalization [NPES Recap]). SMPES Data Visualizer is a web-based, collaborative, joint operation planning (JOP) application that enables combatant commanders and strategic leaders to rapidly coordinate on course of action development. The SMPES Data Visualizer planning environment provides deliberative planning, crisis action planning, decision support tools, and the Global Situational Awareness Tool (GSAT), supporting combatant commanders' visual of geospatial, temporal, and relational planning data (formerly GAP-CIE). SMPES will use a four-year life-cycle replacement plan for Cyber Investments to procure required Commercial Off-The-Shelf (COTS) hardware (e.g. servers, storage devices, workstations, peripherals and other network components) for installation at all fixed/distributed nodes. SMPES FY27 amount increase due to rephasing to align with mission requirements. LI 833570 - Strategic Mission Planning & Execution S... Air Force UNCLASSIFIED Page 1 of 9 P-1 Line #28 Volume 1 - 237 === page 274 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833570 / Strategic Mission Planning & Execution System Equip / BSA 3: Electronics Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Funding for this exhibit contained in PE 0304100F. LI 833570 - Strategic Mission Planning & Execution S... Air Force UNCLASSIFIED Page 2 of 9 P-1 Line #28 Volume 1 - 238 === page 275 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 833570 / Strategic Mission Planning & Execution System Equip / BSA 3: Electronics Programs ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Strategic Mission Planning & Execution System P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 2.484 - / 7.376 - / 6.383 - / 9.435 - / - - / 9.435 - / 2.484 - / 7.376 - / 6.383 - / 9.435 - / - - / 9.435 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY2027 funds will procure hardware, software, and Program Management Administration (PMA) support for Strategic Mission Planning and Execution System (SMPES). Command and Control Facility (C2F), the Extended Air Defense Simulation (EADSIM), Special Access Program (SAP) / Special Access Required (SAR) (ESS) / PRISM systems - ESS / PRISM Systems (TS/ C and SAP SAR) - provides Mission Critical capabilities to SMPES. The system is deployed in the USSTRATCOM C2F and at alternate locations. The ESS/PRISM system provides the capability to conduct necessary Nuclear Command, Control, and Communications (NC3) mission requirements. C2F High Speed Guard System - Automated secure transfer of data between networks of different security classifications required to complete SMPES mission planning. B-Net High Speed Guard System - Securely transfers Aircraft planning data required for Aircraft mission planning between networks of different security classifications; essential for SMPES to complete its mission planning requirement. NPES Legacy Test System - This is the system where software code updates are validated against the current system - work is performed in a closed stand-alone environment. LI 833570 - Strategic Mission Planning & Execution S... Air Force UNCLASSIFIED Page 3 of 9 P-1 Line #28 Volume 1 - 239 === page 276 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 833570 / Strategic Mission Planning & Execution System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Strategic Mission Planning & Execution System MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 2.484 7.376 6.383 9.435 - 9.435 - - - - - - 2.484 7.376 6.383 9.435 - 9.435 - - - - - - 2.484 7.376 6.383 9.435 - 9.435 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Strategic Mission Planning & Execution System Cost Non Recurring Cost GAP CIE production system on SIPR, JWICS, and at alternate location NPES systems at distributed locations (†) EADSIM on TS/C - - - 2.484 5.121 - - 3.622 1 5.121 - 1 2.255 - 1 3.622 - - - - - - - - - 2.484 1 - - - - - - - - - - - - - - - - - - - - - - 2.761 - - - - - - - - - (†) - - - 2.255 (†) - - - - - - 2.761 - - - - - - - - - 3.500 1 3.500 - - - 3.500 1 3.500 - - - - - - - - - 1.762 1 1.762 - - - 1.762 1 1.762 - - - - - - - - - 0.450 1 0.450 - - - 0.450 1 0.450 - - - - - - - - - 3.723 1 3.723 - - - 3.723 1 3.723 Network PRISM - (†) C2F ESS / PRISM Systems (TS/C and SAP SAR) (†) C2F High Speed (†) Guard System B-Net High Speed (†) Guard System NPES Legacy Software Maintenance Environment System 1 (†) LI 833570 - Strategic Mission Planning & Execution S... Air Force UNCLASSIFIED Page 4 of 9 P-1 Line #28 Volume 1 - 240 === page 277 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 833570 / Strategic Mission Planning & Execution System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Strategic Mission Planning & Execution System MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Subtotal: Non Recurring Cost - - 2.484 - - 7.376 - - 6.383 - - 9.435 - - - - - 9.435 Subtotal: Hardware Strategic Mission Planning & Execution System Cost - - 2.484 - - 7.376 - - 6.383 - - 9.435 - - - - - 9.435 Gross/Weapon System Cost - - 2.484 - - 7.376 - - 6.383 - - 9.435 - - - - - 9.435 (†) indicates the presence of a P-5a LI 833570 - Strategic Mission Planning & Execution S... Air Force UNCLASSIFIED Page 5 of 9 P-1 Line #28 Volume 1 - 241 === page 278 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 O O C FY Contractor and Location 2026 General Dynamics / Offutt AFB, NE PO AFNWC Jan 2026 Mar 2026 1 3.622 Y 2024 Northrop Grumman / Offutt AFB, NE PO AFLCMC/HB Battle Management Dec 2023 Jan 2024 1 2.484 Y 2025 Northrop Grumman / Offutt AFB, NE PO AFNWC Dec 2024 Jan 2025 1 5.121 Y 2025 Perspecta Enterprise Solutions LLC / Offutt AFB, NE PO AFNWC Jan 2025 Mar 2025 1 2.255 Y PRISM 2026 General Dynamics / Offutt AFB, NE PO AFNWC Jan 2026 Mar 2026 1 2.761 Y C2F ESS / PRISM Systems (TS/C and SAP SAR) 2027 General Dynamics / Offutt AFB, NE PO AFNWC Feb 2027 Apr 2027 1 3.500 Y C2F High Speed Guard System 2027 General Dynamics / Offutt AFB, NE PO AFNWC Jan 2027 Mar 2027 1 1.762 Y B-Net High Speed Guard System 2027 General Dynamics / Offutt AFB, NE PO AFNWC Jan 2027 Mar 2027 1 0.450 Y NPES Legacy Software Maintenance Environment System 2027 General Dynamics / Offutt AFB, NE PO AFNWC Dec 2026 Feb 2027 1 3.723 Y GAP CIE production system on SIPR, JWICS, and at alternate location (†) NPES systems at distributed locations NPES systems at distributed locations (†) EADSIM on TS/C Network (†) (†) Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: Strategic Mission Planning & Execution System Method/Type or Funding Vehicle Cost Elements (†) P-1 Line Item Number / Title: 833570 / Strategic Mission Planning & Execution System Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) Nov 2023 RFP Issue Date Nov 2023 indicates the presence of a P-21 LI 833570 - Strategic Mission Planning & Execution S... Air Force UNCLASSIFIED Page 6 of 9 P-1 Line #28 Volume 1 - 242 === page 279 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833570 / Strategic Mission Planning & Execution System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Strategic Mission Planning & Execution System Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Fiscal Year 2025 Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E GAP CIE production system on SIPR, JWICS, and at alternate location 1 2026 AF 1 0 1 1 0 1 1 NPES systems at distributed locations 2 2025 AF A - 1 0 EADSIM on TS/C Network 3 2025 AF 1 0 1 2026 AF 1 0 1 A - - 1 0 PRISM 4 1 O C T N O V D E C J A N LI 833570 - Strategic Mission Planning & Execution S... Air Force F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 9 S E P O C T N O V D E C J A N F E B P-1 Line #28 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 243 === page 280 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833570 / Strategic Mission Planning & Execution System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Strategic Mission Planning & Execution System Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Fiscal Year 2027 Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E GAP CIE production system on SIPR, JWICS, and at alternate location 1 2026 AF 1 0 1 A - - 1 0 1 1 0 0 0 NPES systems at distributed locations 2 2025 AF EADSIM on TS/C Network 3 2025 AF 1 1 0 2026 AF 1 0 1 PRISM 4 A O C T N O V D E C J A N LI 833570 - Strategic Mission Planning & Execution S... Air Force F E B 1 M A R 0 A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 9 S E P O C T N O V D E C J A N F E B P-1 Line #28 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 244 === page 281 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 833570 / Strategic Mission Planning & Execution System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 3 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: Strategic Mission Planning & Execution System Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 General Dynamics - Offutt AFB, NE 1 1 1 1 4 2 6 0 0 0 0 2 Northrop Grumman - Offutt AFB, NE 1 1 1 1 3 1 4 0 0 0 0 3 Perspecta Enterprise Solutions LLC - Offutt AFB, NE 1 1 1 1 4 2 6 0 0 0 0 4 General Dynamics - Offutt AFB, NE 1 1 1 1 4 2 6 0 0 0 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 833570 - Strategic Mission Planning & Execution S... Air Force UNCLASSIFIED Page 9 of 9 P-1 Line #28 Volume 1 - 245 === page 282 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 246 === page 283 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834010 / General Information Technology Equip / BSA 4: Spcl Comm-Electronics Projects Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 0.587 0.587 0.587 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 161.928 161.928 161.928 172.085 172.085 172.085 234.417 - - 234.417 - - 234.417 - 234.417 234.417 234.417 331.524 331.524 331.524 148.793 148.793 148.793 132.969 132.969 132.969 To FY 2031 Complete 225.112 225.112 225.112 Total - 1,407.415 - 1,407.415 - 1,407.415 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: PE 0201130F US Northern Command Communications - P-40A a. NORAD AND USNORTHCOM INTEROPERABLE COMMUNICATIONS: This includes mission specific communications enhancements to support extension of Public Switched Telephone Network (PSTN), Commercial Internet and Cellular-Wireless/First Responder Network 4G LTE to Civil Authorities from the DoW Satellite Teleports either directly to the Civil Authorities' communications systems or through DoW communications systems. This program combines the Interoperable Communications and Joint Tactical Radio System (JTRS) compliant radio handsets to enable the Defense Support of Civil Authorities mission. b. DEPLOYABLE COMMUNICATIONS CAPABILITIES SYSTEM LIFE CYCLE MANAGEMENT: The USNORTHCOM Deployable Communications Fleet consists of Emergency Response Vehicles (ERV) Mobile Command Platforms (MCP), Rapid Response Kits (RRK) and fly-away communications systems, in expeditionary modular and scalable form factors that can be flown on commercial airlines or military aircraft to a nationally declared disaster. (NC J6 DCCS combined the previously approved and funded Cellular System Technical Refresh and Emergency Response Communications System into one consolidated effort). PE 0207253F Compass Call - P-40A Compass Call is the Air Force's wide-area, standoff, Airborne Electromagnetic Attack (AEA) Command and Control Warfare/Information Operations (C2W/IO) weapon system. The employment of this weapon system interrupts the adversary's use of the electromagnetic battlespace and is a key active component in the information battlespace and prosecution of current ground and airborne threats. Compass Call's sophisticated electromagnetic attack system is capable of surgical denial and/or disruption of adversary Radio Frequency (RF) communications, radar and sensor systems. PE 0207407F Electromagnetic Battle Management (EMBM) - P-40A The Department of the Air Force (DAF) Electromagnetic Battle Management (EMBM) program is an automated family of systems/applications linked by common architectures, standards and data that will expeditiously receive, analyze, display, employ, and securely distribute friendly, neutral, and adversary Electromagnetic Spectrum (EMS) information. DAF EMBM will consist of five component capabilities; the ability to attain, maintain, and monitor the spectrum for EMS Situational Awareness (SA), assessment, and mission planning, decision support with command and control, and training interfaces to all levels of EMS Operations (EMSO). DAF EMBM will feed into USSTRATCOM's EMBM-Joint (EMBM-J) at the Combatant Command-level enabling synchronization of Joint Non-Kinetic Fires and enabling resilient decision advantage in contested EM environments. PE 0207439F Electronic Warfare Integrated Reprogramming (EWIR) - P-40A DISTRIBUTED MISSION OPERATIONS AND THREAT CHANGE ANALYSIS: Conducted by the 453rd Electronic Warfare Squadron (453 EWS), EWIR provides analytical capabilities and reachback support for DoW acquisition, planning and mission execution activities. These capabilities ensure electronic warfare (EW) systems and integrated combat platforms correctly recognize and respond to enemy, friendly LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 1 of 66 P-1 Line #29 Volume 1 - 247 === page 284 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834010 / General Information Technology Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A and noncombatant systems operating within the electromagnetic environment. The effort includes funds used to procure specialized information technology systems used to identify electromagnetic spectrum emitter changes that impact combat defensive and electronic warfare systems and to conduct detailed analyses in support of operational mission planning, tactics, techniques and procedures (TTP) development, acquisition and test and evaluation. These analyses provide the means to understand the performance of their systems in hostile environments, directly impacting the survivability of combat-coded USAF aircraft and aircrews. Funding for this exhibit contained in PE 0207439F. PE 0207448F C2ISR Tactical Data Link - P-40A Tactical Data Links (TDLs) are critical components of aerial layer networks used in both peacetime and combat to exchange vital information. This information includes formatted messages, radar tracks, target data, platform status, imagery, free-text messages, and command assignments. TDLs provide essential interoperability, local/global connectivity, and enhanced situational awareness, enabling users to train and fight effectively in dynamic operational environments. Specifically, TDLs increase mission effectiveness through improved air domain awareness, positive combat identification, sensor data fusion, and digital sharing of target/threat information, facilitating time-critical targeting and other critical mission tasks. TDLs consist of both the hardware, support equipment, and the enabled communications network such as Link 16, Link 11, Link 22, Situational Awareness Data Link (SADL), Variable Message Format (VMF), Intra-Flight Data Link (IFDL), and other Advanced TDL Link technologies, such as Tactical Targeting Network Technology (TTNT), Common Data Link (CDL), and Multifunction Advanced Data Link (MADL). This program element provides for the expansion of Link 16 Alaska (LAK), procuring the necessary hardware, integration, assembly, and testing to add six additional sites to the LAK network. This expansion is critical as current LAK sites do not meet current and future threat predictions, and significant gaps in coverage across key areas limit essential digital and voice connectivity in the Alaska Area of Responsibility. Additionally, this program element supports the expansion of Pocket-J, which resolves an immediate warfighter need for North American Aerospace Defense Command (NORAD) by providing a clear air picture for defense against hostile aircraft over the Continental United States (CONUS). These remotely operated coverage areas, referred to as "pockets," enable the Air Defense Sectors (ADS) to provide multi-TDL coverage over key metropolitan areas. Tactical Data Link (TDL) enterprise efforts include equipment, fielding support, and associated contract support for the fielded Family of Gateways, as well as capability enhancements to TDLs, gateways, and AF contributions to the Joint Aerial Layer Network (JALN) such as Scalable Portable Integrated Data Router (SPIDR) software and ancillary equipment, and SATURN/SEDR waveform licenses. These tactical data networking systems enable combat forces to exchange information quickly and accurately by bridging discrete airborne, terrestrial, maritime, and space-based C4ISR networks. Tactical Data Link (TDL) Planning, Analysis and Monitoring (PAM) systems will allow Joint Interface Control Officers to dynamically manage Joint Multi-Tactical Data Link Networks and provide decision quality information to the warfighter. The TDL PAM tool delivers needed analysis and management capabilities to AoCs, CRCs, and Air Defense Sectors. Enterprise efforts include other tactical data links management systems such as the Link Management and Monitoring Tool (LMMT), and replacements for both the Joint Air Defense System Integrator (JADSI) and Joint Range Extension (JRE) with Tactical Equipment Package (JTEP) with SPIDR equipment, and Link 16 Alaska system expansion. Enterprise comm equipment and ancillary systems in support of ABMS/JADC2 networking and connectivity operations which provide situational awareness in the contested environment. These systems will add capability to modernize CONUS/OCONUS ground based strike decisions in the hostile environment. Funding for this exhibit contained in PE 0207448F. PE 0207573F National Technical Nuclear Forensics - P-40A Continues efforts previously funded by OSW for Prompt Diagnostics. Procures terrestrial-based sensors and communications for prompt diagnostics, collection, analysis, and evaluation of a nuclear detonation. Funding also includes procurement of technical data and any required initial system support as well as initial installation costs. PE 0207605F Wargaming and Simulation Centers - P-40A Enables the USAFE-AFAFRICA Warfare Center (UAWC) to conduct and support integrated and distributed Live, Virtual, and Constructive (LVC) warfighter training for Joint and Combined partners in the European and African theaters. PE 0207701F Full Combat Mission Training - P-40A Enables the USAFE-AFAFRICA Warfare Center (UAWC) to conduct and support integrated and distributed Live, Virtual, and Constructive (LVC) warfighter training for Joint and Combined partners in the European and African theaters. PE 0207606F Joint Simulation Environment - P-40A LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 2 of 66 P-1 Line #29 Volume 1 - 248 === page 285 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834010 / General Information Technology Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A The Joint Simulation Environment (JSE) is the Air Force's integrated digital test and training range solution. JSE provides a physics-based synthetic environment, including relevant weapons and threats to support High-End Advanced Tactics, Training and Testing. JSE supports operational plan rehearsals, large force exercises, and aircrew training events. The high-fidelity simulator training to be provided by JSE improves throughput capacity of Formal Training Units and increases joint warfighter tactical readiness. Funding will cover required hardware, software, integration, and procurement of peripheral equipment and systems including, but not limited to, facility Information Technology upgrades, fiber connectivity, labor, battle-stations, as well as initial spares. Additionally, funding may be used to procure, but is not limited to, both hardware, software and infrastructure to execute day-to-day operations of the system, brief and debrief of executed training, as well as long term storage, analysis, and data processing. Funding may be used to address Diminishing Manufacturing Source issues, as well as for overarching programmatic support. This requirement (or modification) supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Funding for this exhibit contained in PE 0207606F. PE 0207697F Distributed Training and Exercises - P-40A AIR FORCE DISTRICT WASHINGTON: Wargaming analysis suites, hardware, and software in direct support of the Wargaming Informational Environment (WIE), which is distributed across the National Capitol Region, United States Air Force, and Combatant Commands worldwide. The WIE is employed in wargames to inform Department of the Air Force (DAF) budgeting and programming choices needed to fully implement and align with the National Defense Strategy. Funding for this exhibit contained in PE 0207697F. PE 0208288F Intel Data Applications - P-40A Funds support the purchase, installation, and integration of communication infrastructure systems required to support the processing and extraction of multiple types of intelligence data. This infrastructure will enable application of signal processing techniques, process automation, data triage, and artificial intelligence (AI) and machine learning (AI/ML). Provides intel funding for automated data processing, software coding, data analytics, project management, and overall Air Force and Joint Intelligence processes and systems. Funding for this exhibit contained in PE 0208288F. PE 0305128F Security and Investigative Activities - P-40A The Air Force Office of Special Investigation (AFOSI) Directorate of Warfighting Integration is responsible for the delivery of Information Technology (IT) services, both unclassified and classified, to over 250 locations, world-wide. The directorate also has the responsibility for continually identifying and implementing advanced applications, tools and IT technology that improve AFOSI's ability to manage investigative activity for Air Force leaders. It accomplishes this mission through the management and oversight of personnel, products and systems associated with unclassified, Secret, special access, law enforcement sensitive (LES) and Top Secret/SCI computers and information systems, long-haul, communications circuits, official records, Privacy Act, Freedom of Information Act, publication and forms, and official mail to achieve the command's operational objectives in support of the AF and Office of the Secretary of Defense as well as to achieve Executive mandates to improve information sharing within and between the law enforcement and intelligence communities. PE 0305601F Mission Partner Environments - P-40A FY 2027 Mission Partner Environment requirements and resources transition from United States Air Force to DISA. Funds supported the legacy MPE capabilities including PEGASUS, the Combined Federated Battle Labs Network (CFBLNet), Command, Control, Communications, Computers, and Interoperability (C4I) Services Operations Group CSOG. PE 0604281F Tactical Data Networks Enterprise - P-40A Requirement and funding for the exhibit re-aligned to 0207448F PE 0708012F Logistics Support Activities - P-40A GUNTER AIR FORCE BASE NETWORK SERVICES provide unique local area network (LAN) hardware to the population at Maxwell Air Force (MAFB)-Gunter Annex, AL including equipment for web access, file storage backup, information security, and application testing for AF programs worldwide hosted at MAFB-Gunter Annex, AL. LAN equipment enables MAFB-Gunter Annex to manage/support 122 programs and systems worldwide. MAFB-Gunter Annex exceeds the standard Base Information Transport Infrastructure (BITI) environment, therefore no funding is provided by BITI. PE 0801380 AF LVC Operational Training (LVC-OT) - P-40A LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 3 of 66 P-1 Line #29 Volume 1 - 249 === page 286 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834010 / General Information Technology Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A SIMULATORS COMMON ARCHITECTURE REQUIREMENTS AND STANDARDS (SCARS): An initiative to establish a common open-system, government reference architecture for United States Air Force simulators that provides a common foundation for training systems to move away from unique, "stove-piped" solutions. Effort establishes government owned standards to allow for leveraging common applications and reduce redundancy and costs by enabling the sharing of applications and data across multiple simulator platforms (examples include, but are not limited to, weapon models and image generators). Effort supports rapid streamlined updates to weapon systems' training capabilities to ensure concurrency with aircraft Operational Flight Program, centrally managed controls to ensure cybersecurity vulnerabilities are identified and mitigated, and minimized life-cycle costs by leveraging virtualization and containerization. Effort also includes, but is not limited to, leveraging and integrating on-premise equipment with existing training environments, including Joint Simulation Environment as well as other related program support activities. PE 0804711F Recruit Training Units - P-40A BASIC MILITARY TRAINING (BMT) SURVEILLANCE SECURITY SYSTEM: Basic Military Training sustains the combat capability of the Air Force (Active duty, Air National Guard and Air Force Reserve Command) with trained airmen. Military Training Instructor (MTI) Misconduct-Restore The Trust /Requirements associated with MTI misconduct issues at BMT. Due to the sexual misconduct by MTIs at BMT, AETC/CC directed a Commander Directed Investigation (CDI) to identify issues that place Airmen at risk in their training environment. SECAF/CSAF support findings and recommended actions to "Eliminate Detection Weakness". This effort continues the purchase, installation, and integration of a surveillance system covering common areas of the BMT facilities at JBSA-Lackland AFB for the deterrence and prosecution of misconduct. It includes hardware, system engineering/test and evaluation, site survey, infrastructure installation and support. Detailed requirements include: network switch, network storage device/upgrade package, computer monitor, site license, channel expansion license, hard drive, uninterruptable power supply, extended battery, digital monitor, cameras, and camera communication cable. PE 0804721F Service Academies - P-40A AIR FORCE ACADEMY: FIX AIR FORCE ACADEMY MISSION NET: USAFA is executing a multi-year project to fix disconnects/deficiencies in its University-wide WiFi system on its primary mission network. Most buildings were built in the 1960s (governed by historic preservation rules/restrictions), and either do not have any WiFi at all, or have sub-standard WiFi coverage insufficient to meet USAFA's mission requirements for academics, military training, aviation/airmanship, and NCAA athletics. PEC 84721 IT Investment funds (3080) are sole source of funding for this multi-year program to fix these disconnects/ deficiencies, and ensure we are able to meet our 10 U.S.C Section 9453 requirement to graduate and commission approximately 1,000 2Lt's each year. The lack of WiFi is a direct, causal and imminent risk to USAFA's accreditation as a degree-granting university. PE 0804731F General Skill Training - P-40A GENERAL SKILL TRAINING: General Skills Training supports initial, advanced and supplemental training associated with all Air Force career fields taught or managed under Goodfellow, Keesler, Vandenberg, Sheppard, Lackland, and Fort Sam. This includes classroom and field training operations, management systems for students and faculty, and other requirements directly supporting Technical Training Groups, detachments, and various operating locations. TECHNICAL TRAINING MANAGEMENT SYSTEM (TTMS): TTMS provides AETC personnel and other users a suite of integrated and customized Commercial Off-The-Shelf (COTS)/Government Off-The-Shelf (GOTS) software products implemented in a centralized, enterprise-wide, web-based architecture for the development and administration of basic military and technical training. TTMS supports nine functions: student management, course design and development (for AETC and METC), student evaluation, statistical analysis and reporting, surveys, assessments and testing, Airman Interactive Management System (AIMS) for Military Training Leaders, Job Match/Seat Bank, and TTMS BMT for student processing. PE 0804751F Professional Military Education - P-40A Air University (AU) Education Technology (ET) Program funds the cradle-to-grave lifecycle management of IT systems, services, and resources that comprise AU Enterprise ET/IT portfolio. The primary systems under AU IT are the Course Development, Student Administration and Registrar System (CDSAR), Student Transcript, Admin, and Record system (STARS), Student Information System (AUSIS), Student Record Information System (AUSRIS), Registrar Education Program Management (AUREPM), and Student Management System (AUSMS). This portfolio provides enrollment, content delivery, and student administration capabilities critical to all AU resident and non-resident courses. At the Air Force level, A6 provides the system of record capability for all AF PME/PCE; a system crucial to ensuring a fully prepared (trained and educated) expeditionary force. As AU aggressively pursues the enhancement of processes by which educational products are delivered to students, ET/IT demands will increase in frequency and complexity. Quickly revising software and inserting technology into those processes in a timeframe adequate to realize return on investment dollars or educational benefits requires an appropriately resourced A6 organization. PE 0804752F Other Professional Education - P-40A LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 4 of 66 P-1 Line #29 Volume 1 - 250 === page 287 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834010 / General Information Technology Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Air Force Institute of Technology (AFIT) Lab Equipment procurement for AFIT's accredited graduate engineering programs (to include graduate student thesis / dissertations research, and USAF/DoW research needs). The Graduate School provides degrees and certificates in engineering, applied science, mathematics and management. Its in-residence and distance learning degree programs serve military and civilian students across the U.S. Air and Space Forces, Department of War, other government agencies, International partners, and government contractors. This lab equipment provides AFIT's students with several significant advantages, including a more personalized educational experience; academic programs with a defense-related focus; and research on high-priority defense problems. Faculty and students are directly engaged in game-changing technologies from being able to use of this equipment to research and study Hypersonics, Directed Energy, Data Analytics, Autonomy, Digital Engineering, Defense Innovation, and Artificial Intelligence. PE 0901410F CONTRACTING INFORMATION TECHNOLOGY SYSTEM - P-40A The Contracting Information Technology (CON-IT) system enables the Department of the Air Force (DAF) to accomplish its mission effectively and securely in today's rapidly changing and increasingly contested cyber domain. The Air and Space Forces require a single, 21st century contract management solution to enable DAF mission execution, from acquiring and sustaining weapon system platforms, to supporting contingency operations overseas. CON-IT supplies this single solution by consolidating and replacing numerous aging and increasingly unsupportable, legacy contract writing and management systems, while enabling the Air and Space Forces to procure vital capability faster and with increased data accuracy through built-in automation. Specifically, CON-IT's functionality provides contract data sharing interoperability across all DAF contracting communities and external business partners such as Defense Contract Management Agency, Defense Finance and Accounting Service, and industry partners. In addition, CONIT facilitates the execution of the DAF's 200+ billion annual budget, ensuring global procurement operations are timely, auditable, and secure. This requirement supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Funding for this exhibit contained in PE 0901410F. LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 5 of 66 P-1 Line #29 Volume 1 - 251 === page 288 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834010 / General Information Technology Equip / BSA 4: Spcl Comm-Electronics Projects Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD P-5a MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 US Northern Command Communications A - / - - / 4.142 - / 4.044 - / 21.611 - / - - P-5 Compass Call A - / - - / 0.000 - / 0.000 - / 5.000 - / - - / 5.000 P-5 Electromagnetic Battle Management (EMBM) A - / - - / 0.000 - / 0.000 - / 10.000 - / - - / 10.000 P-5 Electromagnetic Warfare Int Reprog (EWIR) A - / - - / 1.587 - / 2.019 - / 55.898 - / - - / 55.898 P-5 C2ISR Tactical Data Link A - / - - / 5.539 - / 10.837 - / 17.082 - / - - / 17.082 P-5 National Technical Nuclear Forensics P-5a, P-21 A / 0.587 - / 6.779 - / 3.285 - / 3.577 - / - - / 3.577 P-5 Joint Simulation Environment (JSE) P-5a, P-21 A - / - - / 79.535 / 105.610 - / 10.497 - / - - / 10.497 P-5 Distributed Training and Exercises P-5a, P-21 A - / - - / 0.356 / 0.346 - / 0.365 - / - - / 0.365 P-5 Full Combat Mission Training B - / - 1 / 0.849 9 / 7.762 - / 69.671 - / - - / 69.671 P-5 Intel Data Applications A - / - - - / 7.641 - / 7.904 - / - - / 7.904 P-5 Security and Investigative Activities B - / - 1 / 5.030 1 / 5.125 - / 5.344 - / - - / 5.344 P-5 Mission Partner Environments A - / - - / 20.093 - / 2.086 - / 0.000 - / - - / 0.000 P-5 Communications and Information Technology A - / - - / 2.067 - / 0.184 - / 0.192 - / - - / 0.192 P-5 Tactical Data Networks Enterprise A - / - - / 4.727 - / 0.000 - / 0.000 - / - - / 0.000 P-5 Logistics Support Activities A - / - - / 2.335 - / 2.378 - / 2.482 - / - - / 2.482 P-5 AF LVC Operational Training (LVC-OT) A - / - - / 12.107 - / 12.339 - / 12.866 - / - - / 12.866 P-5 Recruit Training Units A - / - - / 0.900 - / 0.916 - / 0.956 - / - - / 0.956 P-5 Service Academies A - / - 1 / 4.532 1 / 2.799 1 / 2.870 - / - 1 / 2.870 P-5 General Skill Training A - / - - / 0.744 - / 0.757 - / 0.788 - / - - / 0.788 P-5 Professional Military Education A - / - - / 1.082 - / 1.104 - / 1.151 - / - - / 1.151 P-5 Other Professional Education A - / - - / 0.522 - / 0.532 - / 0.555 - / - - / 0.555 P-5 Air Force Studies and Analysis Agency A - / - - / 0.000 - / 0.000 - / 5.608 - / - - / 5.608 P-5 Contracting Information Technology System A - / - 1 / 1.509 1 / 2.321 - / 0.000 - / - - P-40 Total Gross/Weapon System Cost / 234.417 - / - P-5a, P-21 P-5a, P-21 P-5a P-5a, P-21 - - / 0.587 - - / 7.493 / 161.928 - / 172.085 - - / 21.611 / 0.000 / 234.417 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: This program, PE 0207253F P-5, is a new start. This program, PE 0207407F P-5, is a new start. PE 0201130F US Northern Command Communications - NORAD AND USNORTHCOM INTEROPERABLE COMMUNICATIONS: FY 25 funding will ensure system life cycle support of the Deployable Communications Fleet, as well as the lifecycle maintenance of these USNORTHCOM deployable communication systems. A centralized managed construct to enable the configuration management of deployable communication systems. LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 6 of 66 P-1 Line #29 Volume 1 - 252 === page 289 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834010 / General Information Technology Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A PE 0207253F Compass Call - FY 2027 funding procures environmental protection ground equipment including sunshades for EA-37B Compass Call mission support equipment for the 55th ECG at DavisMontham AFB. Environmental protection equipment is forecasted to significantly increase lifespan of ground support equipment currently under intense light exposure. PE 0207407F Electromagnetic Battle Management - Fy27 funding will procure the hardware, software, and licenses for the Early Operational Capability ground unit to be installed in the participating Air Operations Center as a test bed for advanced operational testing. Further funding will be used for the EMS IT modernization efforts and required system architecture required to link the system into DAF Battle Network and STRATCOM's EMBM-J system. PE 0207439F Electronic Warfare Integrated Reprogramming (EWIR) - FY2026 Funding will be used to replace capital equipment for the electronic warfare (EW) Threat Change Analysis and Distributed Mission Operations infrastructure and databases. Specific equipment items and quantities may change due to mission needs. PE 0207448F FY27 Funds will be used to procure equipment, fielding support, and associated contract support for the fielded gateways, as well as capability enhancements to TDLs, gateways, and Air Force contributions to the DAF Battle Network. These funds will procure the Link Monitoring and Management Tool (LMMT) and Scalable Portable Integrated Data Router (SPIDR) software. LMMT and SPIDR combined are being used to replace the legacy, unsupportable Joint Air Defense System Integrator (JADSI) and are being considered for the future consolidation of other legacy gateways. This combined capability will allow Joint Interface Control Officers (JICOs) to dynamically manage Joint Multi-Tactical Data Link Networks and provide decision-quality information to the warfighter by bridging discrete airborne, terrestrial, maritime, and space-based C4ISR networks. The investment in Link 22 is crucial as it provides a long-range, beyond-line-of-sight (BLOS) data link for situations where SATCOM is unavailable, ensuring interoperability between various air, surface, subsurface, and ground-based tactical data systems used by the U.S. Navy, NATO, and coalition partners. Link 22 is the designated replacement for Link 11, as directed by the DoW CIO. Funding for this exhibit contained in PE 0207448F. PE 0207573F National Technical Nuclear Forensics - FY 2025 funding procures terrestrial-based nodes/sensors for signal detection, collection, analysis, and evaluation of a nuclear detonation. Funding also includes procurement of technical data required for production and any required initial system support as well as initial installation costs. PE 0207701F Full Combat Mission Training - FY 2027 funding increase enables USAFE-AFAFRICA Warfare Center (UAWC) to lead USAFE and AFAFRICA toward full integration of Live, Virtual, and Constructive (LVC) capabilities with our Coalition partners and assures capital equipment replacement and network system upgrades for the command and control, warfighting, and support training systems at the tactical and operational levels of warfare, as well as supports expanding and upgrading F-35 Distributed Mission Operations. FY27 funding increases USAFE-AFAFRICA Warfare Center's ability to replicate adversary environments through procurement of multiple radar threat systems to present a signal dense, contested environment for training with Joint and Coalition partners. PE 0207606F Joint Simulation Environment (JSE) - FY 2027 funds support efforts to build a network and infrastructure with multiple security levels, including, but not limited to, the JSE battlespace environment, threat simulation procurement, brief and de-brief equipment, programmatic support, initial spares, and all peripheral equipment, commercial off-the-shelf Software, and systems for JSE-enabled sites supporting training. Funding also covers required site facility updates and labor for all funding items. Provides virtual training capability in support of the Office of the Secretary of War readiness objectives. Joint warfighter readiness across test, tactical, operational, and strategic levels are enabled through operationally representative training in a seamless and connected virtual environment. FY27 decrease reflects near complete standup of Joint Integrated Test and Training Center - Nellis battlespace in FY26. PE 0207697F Distributed Training and Exercises - FY 2027 funding will be used to procure hardware, software and licensing to complete and instantiate the latest version of the Wargame Information Environment in support of CSAF and AFMAJCOMs objective priorities for Air Force Wargaming Enterprise. Develop and assimilate tools that capture consequences of alternative force structures and capabilities employed in wargames to inform Department of the Air Force (DAF) budgeting and programming choices needed to fully implement and align with the National Defense Strategy. Continue to expand and develop the Headquarters USAF (HAF) Wargaming Information Environment (WIE) by integrating the latest technology and tools that will support of a more flexible, robust, and agile wargaming enterprise that is quicker to respond and tailorable for a wider range of wargaming. LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 7 of 66 P-1 Line #29 Volume 1 - 253 === page 290 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834010 / General Information Technology Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A PE 0208288F Intel Data Applications - FY 2027 Funding supports the purchase, installation, and integration of communication infrastructure systems required to support the processing and extraction of multiple types of intelligence data. This infrastructure will enable application of signal processing techniques, process automation, data triage, and artificial intelligence (AI) and machine learning (AI/ML). Funds will support the application of Intelligence data as datasets/databases, model and simulations, and analysis for combat and combat support users. Provides for the communications infrastructures required to support Intelligence data applications. PE 0305128F Security and Investigative Activities - FY2025 funds will provide AFOSI Server Virtualization, which will increase efficiency of limited system administrative staff and reduce future capital investment costs of new hardware. The virtual server environment also delivers new capability not available in a non-virtual server environment, such as rapid Information Assurance patching, automatic error detection, failover and disaster recovery of critical applications, reduce footprint from both a physical space and energy perspective. These funds will enable AFOSI standard IT equipment and specialized investigative equipment to provide the latest capabilities of specialized investigative support to DoD/USAF investigations/operations both in-garrison and in support of wartime operations, for over 3,000 AFOSI personnel in more than 250 worldwide locations. PE 0305601F Mission Partner Environments - P-40A FY 2027 Mission Partner Environment requirements and resources transition from United States Air Force to DISA. Funds supported the legacy MPE capabilities including PEGASUS, the Combined Federated Battle Labs Network (CFBLNet), Command, Control, Communications, Computers, and Interoperability (C4I) Services Operations Group CSOG. PE 0308611F Electromagnetic Spectrum Visualization and Reporting System (EVRS) - HQ USAFE-AFAFRICA Electromagnetic Spectrum Visualization and Reporting System (EVRS) is a comprehensive communication and spectrum monitoring system in Europe and Africa. This system is responsible for monitoring and managing radio frequency (RF) spectrum compliance, ensuring users adhere to assigned spectrum licenses, geolocating rogue emitters, mitigating unwanted RF interference, identifying, and locating offenders, and providing and additional sensor for detecting and tracking drones. These functions collectively enhance communication security, airspace management, and support various DoW and Air Force priorities in the region. PE 0604281F Tactical Data Networks Enterprise Requirement and funding re-aligned to PE 0207448F for FY 2026 and beyond. PE 0708012F Logistics Support Activities - FY2027 funding will continue to update hardware resources for the Gunter LAN to deliver full network support. This infrastructure enables continued operational testing of the Universal Desktop Configuration (UDC) and other Microsoft products. Continues efforts for AFLCMC/GB programs (Logistics systems including EDCL) to ensure seamless integration of new capabilities w/ o harm to operational systems and negative impact to personnel across the AF PE 0801380 AF LVC Operational Training (LVC-OT) SIMULATOR COMMON ARCHITECTURE REQUIREMENTS AND STANDARDS (SCARS): FY2027 efforts include, but are not limited to, establishing and maintaining system site connections to the Security Operations Centers (SOCs) to centrally provide cybersecurity maintenance (e.g., scanning, patching, vulnerability assessments), helping to mitigate cybersecurity vulnerabilities, address cybersecurity requirements, and meet Authority to Operate requirements. FY2027 may also include the hardware and software for the SCARS SOCs, supporting the transition to a Government SOC able to support programs at multiple classification levels. Additionally, FY2027 efforts may include the purchase of equipment and software licenses to expand capabilities at training system integration labs and operational training sites. FY2027 efforts may also include, but are not limited to, the deployment of hardware to support training system virtualization into the SCARS Common Architecture enhancing the ability of aircraft Training Systems to maintain concurrency with aircraft Operational Flight Program updates, ease modernization of training systems, and reduce vendor hardware dependencies. Hardware and software will include, but is not limited to, tools that improve SCARS effectiveness and Air Force training systems operations by enabling delivery and integration of capabilities and promote the use of standardization and automation. Efforts may also support procurement of common applications such as a geospatial data repository for use across Training Systems. Funding may also be used to address Diminishing Manufacturing Source (DMS) issues, obsolescence resolution and similar emerging requirements, and program support activities. PE 0804711F Recruit Training Units - FY2025 funding will procure general information technology equipment for BASIC MILITARY TRAINING (BMT) SURVEILLANCE SECURITY SYSTEM: Basic Military Training sustains the combat capability of the Air Force (Active duty, Air National Guard and Air Force Reserve Command) with trained airmen. Detailed requirements include: network switch, network storage device/upgrade package, computer monitor, site license, channel expansion license, hard drive, uninterruptable power supply, extended battery, digital monitor, cameras, and camera communication cable. LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 8 of 66 P-1 Line #29 Volume 1 - 254 === page 291 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834010 / General Information Technology Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A PE 0804721F Service Academies - AIR FORCE ACADEMY: FY2025 funding will be used for the FIX AIR FORCE ACADEMY MISSION NET effort. This effort specifically provides WIFI system components across the academic mission area. PEC 84721 FY22 funds (3080) are mission-critical for USAFA's multi-year project to fix disconnects/deficiencies in its University-wide WiFi systems on its mission network. PE 0804731F General Skill Training - FY2025 funding will support procurement of electronic and telecom equipment supporting the General Skills Training enterprise, and primarily includes video equipment and training management systems equipment (other than TTMS). PE 0804752F Other Professional Education - FY2026 funding Supports: AFIT's Engineering Graduate School maintains a strong applied-research focus through seven multi-disciplinary research centers: Autonomy and Navigation Technology Center, Center for Cyberspace Research, Center for Directed Energy, Center for Space Research and Assurance, Center for Technical Intelligence Studies and Research, Homeland Security Community of Best Practices, and the Nuclear Expertise for Advancing Technologies Center. Additionally, AFIT is designated as the Air Force's Cyberspace Technical Center of Excellence and is the home of the Scientific Test and Analysis Techniques Center of Excellence, which delivers independent, tailored application of STAT to support test and evaluation teams across the Department of War of Homeland Security. The Graduate School equipment requirements vary each year based on the research projects being requested. A more specific example of the types of equipment this funding supports is to procure a 5-axis Computerized Numerical Control milling machine used to create custom research test fixtures and research apparatuses for AFIT students and faculty members conducting advanced DOD-focused research across multiple disciplines (for example: hypersonics, aerodynamics, custom devices for fundamental physics exploration, and a host of other technical applications). Additionally, AFIT will procure a high-speed, hyper-spectral, thermal imaging system that operates in the long-wave infrared (LWIR) band that will enable AFIT to conduct research that couldn't be done previously (for example, long-wave hyperspectral imaging of fast events such as explosion dynamics). PE 0901410F CONTRACTING INFORMATION TECHNOLOGY SYSTEM - FY 2027 requires no Procurement funding. In FY27, licenses will be converting from a perpetual license model to a subscription-based license model requiring future license costs to be funded with O&M. LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 9 of 66 P-1 Line #29 Volume 1 - 255 === page 292 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: US Northern Command Communications MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 4.142 4.044 21.611 - 21.611 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 4.142 4.044 21.611 - 21.611 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 4.142 4.044 21.611 - 21.611 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - US Northern Command Communications Cost Recurring Cost Deployable Comms Infrastructure/ - - - 1.452 1 1.452 - - 4.044 21.611 (†) - - - 0.641 1 0.641 - - - - Subtotal: Recurring Cost - - - - - 2.093 - - 4.044 - - - - - 2.093 - - 2.049 - (†) Equipment Rapid Response Kit Level 1 Subtotal: Hardware US Northern Command Communications Cost 1 21.611 - - - 21.611 1 21.611 - - - - - - - - - - 21.611 - - - - - 21.611 4.044 - - 21.611 - - - - - 21.611 - - - - - - - - - - - Vehicles - US Northern Command Communications Cost Recurring Cost ERV / MCP Mobile Comms Systems (†) Lifecycle Subtotal: Recurring Cost - - - 2.049 1 - - - - - 2.049 - - - - - - - - - - - - Subtotal: Vehicles - US Northern Command Communications Cost - - - - - 2.049 - - - - - - - - - - - - Gross/Weapon System Cost - - - - - 4.142 - - 4.044 - - 21.611 - - - - - 21.611 (†) indicates the presence of a P-5a LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 10 of 66 P-1 Line #29 Volume 1 - 256 === page 293 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Item Number / Title [DODIC]: US Northern Command Communications FY Contractor and Location Method/Type or Funding Vehicle Deployable Comms Infrastructure/ Equipment 2025 Varied / Varied Various ARMY/ACC Mar 2025 Mar 2026 1 1.452 Y Deployable Comms Infrastructure/ Equipment 2027 Varied / Varied Various ARMY/ACC Mar 2026 Mar 2027 1 21.611 Y Rapid Response Kit Level 1 2025 Varied / Varied Various ARMY/ACC Mar 2025 Mar 2026 1 0.641 Y ERV / MCP Mobile Comms Systems Lifecycle 2025 Varied / Varied Various ARMY/ACC Mar 2025 Mar 2026 1 2.049 Y Cost Elements O O C P-1 Line Item Number / Title: 834010 / General Information Technology Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date Remarks: Current contract W15P7T-13-D-0015/W15P7T-18-F-0086; Current vendor: DataPath; Current PoP ends 25Mar22 Contract vehicle in new acquisition / re-compete process; Forecasted award: March 2022 LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 11 of 66 P-1 Line #29 Volume 1 - 257 === page 294 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Compass Call MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 0.000 0.000 5.000 - 5.000 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.000 0.000 5.000 - 5.000 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.000 0.000 5.000 - 5.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Support - Compass Call Cost Environmental Protection Support - - - - - 0.000 - - 0.000 5.000 Subtotal: Support - Compass Call Cost - - - - - 0.000 - - 0.000 - Gross/Weapon System Cost - - - - - 0.000 - - 0.000 - LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 12 of 66 1 5.000 - - - 5.000 - 5.000 - - - - - 5.000 - 5.000 - - - - - 5.000 P-1 Line #29 1 5.000 Volume 1 - 258 === page 295 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Electromagnetic Battle Management (EMBM) MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 0.000 0.000 10.000 - 10.000 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.000 0.000 10.000 - 10.000 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.000 0.000 10.000 - 10.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Electromagnetic Battle Management (EMBM) Cost Non Recurring Cost - - - - - 0.000 - - 0.000 - - 10.000 - - - - - 10.000 Subtotal: Non Recurring Cost 4 - - - - - 0.000 - - 0.000 - - 10.000 - - - - - 10.000 Subtotal: Hardware Electromagnetic Battle Management (EMBM) Cost - - - - - 0.000 - - 0.000 - - 10.000 - - - - - 10.000 Gross/Weapon System Cost - - - - - 0.000 - - 0.000 - - 10.000 - - - - - 10.000 LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 13 of 66 P-1 Line #29 Volume 1 - 259 === page 296 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Electromagnetic Warfare Int Reprog (EWIR) MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 1.587 2.019 55.898 - 55.898 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 1.587 2.019 55.898 - 55.898 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 1.587 2.019 55.898 - 55.898 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - EWIR Hardware Cost Recurring Cost Client PCs - - - 0.223 1 0.223 0.326 1 0.326 4.351 1 4.351 - - - 4.351 1 4.351 Computer Server - - - 0.638 1 0.638 0.753 1 0.753 5.809 1 5.809 - - - 5.809 1 5.809 Data Storage System - - - 0.503 1 0.503 0.615 1 0.615 6.662 1 6.662 - - - 6.662 1 6.662 Network Infrastructure - - - 0.223 1 0.223 0.325 1 0.325 15.350 1 15.350 - - - 15.350 1 15.350 Subtotal: Recurring Cost - - - - - 1.587 - - 2.019 - - 32.172 - - - - - 32.172 Subtotal: Hardware - EWIR Hardware Cost - - - - - 1.587 - - 2.019 - - 32.172 - - - - - 32.172 Support - Electromagnetic Warfare Int Reprog (EWIR) Cost - - - - - - - - - - - 23.726 - - - - - 23.726 Subtotal: Support Electromagnetic Warfare Int Reprog (EWIR) Cost Lab Infrastructure - - - - - - - - - - - 23.726 - - - - - 23.726 Gross/Weapon System Cost - - - - - 1.587 - - 2.019 - - 55.898 - - - - - 55.898 LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 14 of 66 P-1 Line #29 Volume 1 - 260 === page 297 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: C2ISR Tactical Data Link MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 5.539 10.837 17.082 - 17.082 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 5.539 10.837 17.082 - 17.082 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 5.539 10.837 17.082 - 17.082 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - C2ISR Tactical Data Link Cost Recurring Cost TDL PAM LMMT (Active) PE 0207448F - - - - - - 0.191 8 1.526 0.197 27 5.312 - - - 0.197 27 5.312 JADSI SPIDR (Active) PE 0207448F - - - - - - 0.062 45 2.769 - - - - - - - - - JRE/JTEP SPIDR (Active) PE 0207448F - - - - - - 0.053 50 2.660 - - - - - - - - - Link 22 (Active) PE 0207448F - - - - - - - - - 9.020 9.020 - - - 9.020 Pocket J SPIDR (Active) PE 0207488F - - - - - - 0.376 1.882 - - - - - - - - - Subtotal: Recurring Cost - - - - - - - - 8.837 - - 14.332 - - - - - 14.332 Subtotal: Hardware - C2ISR Tactical Data Link Cost - - - - - - - - 8.837 - - 14.332 - - - - - 14.332 Other Government Support - - - 2.912 1 2.912 2.000 2.000 2.750 2.750 - - - 2.750 C2ISR Engineering/ Integration Support - - - 2.627 1 2.627 - - - - - - - - - - - - Subtotal: Support - C2ISR Tactical Data Link Cost - - - - - 5.539 - - 2.000 - - 2.750 - - - - - 2.750 Gross/Weapon System Cost - - - - - 5.539 - - 10.837 - - 17.082 - - - - - 17.082 5 1 1 9.020 Support - C2ISR Tactical Data Link Cost LI 834010 - General Information Technology Air Force 1 UNCLASSIFIED Page 15 of 66 1 P-1 Line #29 1 2.750 Volume 1 - 261 === page 298 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: National Technical Nuclear Forensics MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 0.587 6.779 3.285 3.577 - 3.577 - - - - - - 0.587 6.779 3.285 3.577 - 3.577 - - - - - - 0.587 6.779 3.285 3.577 - 3.577 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - National Technical Nuclear Forensics Sensors Cost Non Recurring Cost (†) - - - 0.290 Subtotal: Non Recurring Cost - - - - Subtotal: Hardware National Technical Nuclear Forensics Sensors Cost - - - Sensor Type 7 6 1.740 - - - - - - - - - - - - - 1.740 - - - - - - - - - - - - - - 1.740 - - - - - - - - - - - - 0.587 - - - - - - - - - - - - - - - Hardware - NTNF Site Installations Cost Non Recurring Cost Installation of Sensors 7 (†) Installation of Sensors 8 (†) Installation of Sensors 9 (†) Installation of Sensors 10 (†) Installation of Sensors 11 (†) Installation of Sensors 12 (†) Installation of Sensors 13 (†) 0.587 1 - - - 0.431 1 0.431 - - - - - - - - - - - - - - - 0.458 1 0.458 - - - - - - - - - - - - - - - 0.472 1 0.472 - - - - - - - - - - - - - - - 0.480 1 0.480 - - - - - - - - - - - - - - - 0.480 1 0.480 - - - - - - - - - - - - - - - 0.480 1 0.480 - - - - - - - - - - - - LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 16 of 66 P-1 Line #29 Volume 1 - 262 === page 299 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: National Technical Nuclear Forensics MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Detailed Installation Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) - - - 0.164 - - - - - - - 0.167 - - - - - - - - - (†) - Program Support Costs (PSC) Other Government Costs (†) Plan 14 Installation of Sensors 14 (†) Detailed Installation (†) Plan 15 Installation of Sensors 15 (†) Detailed Installation (†) Plan 16 Detailed Installation (†) Plan 17 Detailed Installation Plan 18 Minor Install / Site (†) Upgrade 1 Minor Install / Site (†) Upgrade 2 Minor Install / Site (†) Upgrade 3 Detailed Installation (†) Plan 19 Detailed Installation (†) Plan 20 Minor Install / Site (†) Upgrade 4 Minor Install / Site (†) Upgrade 5 Minor Install / Site (†) Upgrade 6 Minor Install / Site (†) Upgrade 7 Minor Install / Site (†) Upgrade 8 FY 2026 Total Cost Qty (Each) Unit Cost ($ M) 0.164 - - 0.500 0.167 - - - 0.500 - - - - - - - - - - - - - 1.697 - - - - - - Qty (Each) Unit Cost ($ M) Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) - - - - - - - - - 0.500 - - - - - - - - - - - - - - - - - - - 1 0.500 - - - - - - - - - 0.150 1 0.150 - - - - - - - - - - 0.150 1 0.150 - - - - - - - - - - 0.150 1 0.150 - - - - - - - - - 1 1.697 0.753 1 0.753 0.379 0.379 - - - 0.379 0.070 1 0.070 - - - - - - - - - - - - - 0.070 1 0.070 - - - - - - - - - - - - - - 0.070 1 0.070 - - - - - - - - - - - - - - - - - - 0.150 0.150 - - - - - - - - - - - - - - - - - 0.150 0.150 - - - 0.150 - - - - - - 0.072 1 0.072 - - - - - - - - - - - - - - - 0.072 1 0.072 - - - - - - - - - - - - - - - 0.072 1 0.072 - - - - - - - - - - - - - - - 0.072 1 0.072 - - - - - - - - - - - - - - - 0.072 1 0.072 - - - - - - - - - 1 - ($ M) FY 2027 OOC Total Cost - LI 834010 - General Information Technology Air Force 1 ($ M) FY 2027 Base Total Cost 1 - 1 - UNCLASSIFIED Page 17 of 66 1 1 P-1 Line #29 1 1 0.379 0.150 Volume 1 - 263 === page 300 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: National Technical Nuclear Forensics MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Minor Install / Site (†) Upgrade 9 Detailed Installation (†) Plan 21 Detailed Installation (†) Plan 22 Installation of Sensors 16 (†) Installation of Sensors 17 (†) Installation of Sensors 18 (†) Installation of Sensors 19 (†) Installation of Sensors 20 (†) Installation of Sensors 21 (†) Installation of Sensors Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) - - - - - - 0.072 - - - - - - - - - - - - - - - - - - - - 0.500 - - - - - - - - - - - - - - - - - - - - - - - - - FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) 1 ($ M) 0.072 - - - 0.150 - - 0.150 0.500 - - - 0.458 - - - - - - - - - - - - FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) - - - - - 1 0.150 - - - 0.150 1 0.150 1 0.150 - - - 0.150 1 0.150 - - - - - 1 0.458 - - - 0.458 1 0.458 0.458 1 0.458 - - - 0.458 1 0.458 - 0.458 1 0.458 - - - 0.458 1 0.458 - - 0.458 1 0.458 - - - 0.458 1 0.458 - - - 0.458 1 0.458 - - - 0.458 1 0.458 1 0.458 - - - 0.458 1 0.458 1 - ($ M) FY 2027 Total Total Cost - - - - - - - - - - - - - - 0.458 Subtotal: Non Recurring Cost - - 0.587 - - 5.039 - - 3.285 - - 3.577 - - - - - 3.577 Subtotal: Hardware - NTNF Site Installations Cost - - 0.587 - - 5.039 - - 3.285 - - 3.577 - - - - - 3.577 Gross/Weapon System Cost - - 0.587 - - 6.779 - - 3.285 - - 3.577 - - - - - 3.577 22 (†) (†) indicates the presence of a P-5a LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 18 of 66 P-1 Line #29 Volume 1 - 264 === page 301 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 O O C Cost Elements Sensor Type 7 (†) Installation of Sensors 7 (†) Installation of Sensors 8 (†) Installation of Sensors 9 (†) Installation of Sensors 10 (†) Installation of Sensors 11 (†) Installation of Sensors 12 (†) Installation of Sensors 13 (†) (†) Detailed Installation Plan 14 Installation of Sensors 14 (†) (†) Detailed Installation Plan 15 Installation of Sensors 15 (†) (†) Detailed Installation Plan 16 (†) Detailed Installation Plan 17 (†) Detailed Installation Plan 18 Minor Install / Site Upgrade 1 (†) Minor Install / Site Upgrade 2 (†) Minor Install / Site Upgrade 3 (†) (†) Detailed Installation Plan 19 (†) Detailed Installation Plan 20 P-1 Line Item Number / Title: 834010 / General Information Technology Method/Type or Funding Vehicle Item Number / Title [DODIC]: National Technical Nuclear Forensics Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty RFP Issue Date FY Contractor and Location 2025 Honeywell FM&T, LLC / Kansas City, MO MIPR AFLCMC/WI - ISR & SOF Aug 2025 Sep 2026 6 0.290 Y 2023 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Jul 2025 Jul 2026 1 0.567 Y Apr 2025 2025 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Dec 2025 Nov 2026 1 0.431 Y Apr 2025 2025 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Dec 2025 Nov 2026 1 0.458 Y Dec 2024 2025 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Jan 2026 Dec 2026 1 0.472 Y 2025 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Feb 2026 Feb 2027 1 0.480 Y 2025 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Apr 2026 Apr 2027 1 0.480 Y 2025 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Jun 2026 Jun 2027 1 0.480 Y 2025 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Apr 2025 Aug 2025 1 0.164 Y 2026 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Jul 2026 Jul 2027 1 0.500 Y 2025 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Sep 2025 Jan 2026 1 0.167 Y 2026 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Aug 2026 Aug 2027 1 0.500 Y 2026 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Jan 2026 Apr 2026 1 0.150 Y 2026 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Jan 2026 Apr 2026 1 0.150 Y 2026 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Mar 2026 Jun 2026 1 0.150 Y 2025 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Feb 2026 Apr 2026 1 0.070 Y 2025 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF May 2026 Jul 2026 1 0.070 Y 2025 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Jul 2026 Sep 2026 1 0.070 Y 2026 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Jun 2026 Sep 2026 1 0.150 Y 2027 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Oct 2026 Feb 2027 1 0.150 Y LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 19 of 66 P-1 Line #29 (Each) Volume 1 - 265 === page 302 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 O O C Cost Elements Minor Install / Site Upgrade 4 (†) Minor Install / Site Upgrade 5 (†) Minor Install / Site Upgrade 6 (†) Minor Install / Site Upgrade 7 (†) Minor Install / Site Upgrade 8 (†) Minor Install / Site Upgrade 9 (†) (†) Detailed Installation Plan 21 (†) Detailed Installation Plan 22 (†) Installation of Sensors 16 (†) Installation of Sensors 17 (†) Installation of Sensors 18 (†) Installation of Sensors 19 (†) Installation of Sensors 20 (†) Installation of Sensors 21 (†) Installation of Sensors 22 (†) P-1 Line Item Number / Title: 834010 / General Information Technology Method/Type or Funding Vehicle Item Number / Title [DODIC]: National Technical Nuclear Forensics Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty FY Contractor and Location 2026 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Oct 2026 Dec 2026 1 0.072 Y 2026 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Dec 2026 Feb 2027 1 0.072 Y 2026 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Jan 2027 Mar 2027 1 0.072 Y 2026 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Mar 2027 May 2027 1 0.072 Y 2026 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF May 2027 Jul 2027 1 0.072 Y 2026 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Jul 2027 Sep 2027 1 0.072 Y 2027 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Dec 2026 Apr 2027 1 0.150 Y 2027 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Feb 2027 Jun 2027 1 0.150 Y 2026 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Sep 2026 Sep 2027 1 0.500 Y 2027 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Oct 2026 Oct 2027 1 0.458 Y 2027 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Dec 2026 Dec 2027 1 0.458 Y 2027 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Mar 2027 Mar 2028 1 0.458 Y 2027 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Jul 2027 Jul 2028 1 0.458 Y 2027 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Aug 2027 Aug 2028 1 0.458 Y 2027 Applied Research Associates, Inc. / Albuquerque, NM SS / FPIF AFLCMC/WI - ISR & SOF Sep 2027 Sep 2028 1 0.458 Y (Each) RFP Issue Date indicates the presence of a P-21 Remarks: USPDS is a follow-on effort to the Discreet Oculus (DO) program. ARA and Weston Geophysical Corp. successfully installed all sensor nodes for the DO program. Weston Geophysical Corp., was acquired by ARA, March 2019. Experience with engineering support for nuclear phenomena sensor and communications deployment to field sites is critical to the success of the overall installation process. ARA has this specialized experience and used it to reduce the duration of installations by more than 50% since the beginning of the DO program. Due to the unique nature of these sensors and time constraints to accomplish the installations, ARA was selected for the installation process. LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 20 of 66 P-1 Line #29 Volume 1 - 266 === page 303 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: National Technical Nuclear Forensics Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Sensor Type 7 1 2025 AF 6 0 6 A - - - - - - - - - - - 1 0 1 1 0 1 - - 1 5 - - - - - - - - - - - 1 A - - - - - - - - - - 1 0 1 A - - - - - - - - - - 1 1 0 1 A - - - - - - - - - 1 1 0 1 A - - - - - - - - 1 1 0 1 A - - - - - - 1 1 0 1 A - - - - 1 1 0 1 1 0 1 1 0 1 1 0 1 1 0 1 A - - - 1 0 1 0 1 A - - - 1 0 1 0 1 1 0 1 Installation of Sensors 7 2 2023 AF A - 1 0 Installation of Sensors 8 3 2025 AF Installation of Sensors 9 4 2025 AF Installation of Sensors 10 5 2025 AF Installation of Sensors 11 6 2025 AF Installation of Sensors 12 7 2025 AF Installation of Sensors 13 8 2025 AF Detailed Installation Plan 14 9 2025 AF A - - - - 1 0 Installation of Sensors 14 10 2026 AF A - - - 1 Detailed Installation Plan 15 11 2025 AF A - - - - 1 0 Installation of Sensors 15 12 2026 AF A - - 1 Detailed Installation Plan 16 13 2026 AF Detailed Installation Plan 17 14 2026 AF Detailed Installation Plan 18 15 2026 AF A - - - 1 0 Minor Install / Site Upgrade 1 16 2025 AF A - - 1 0 Minor Install / Site Upgrade 2 O C T N O V LI 834010 - General Information Technology Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 21 of 66 S E P O C T N O V D E C J A N F E B P-1 Line #29 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 267 === page 304 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY 17 2025 SERVICE AF PROC QTY Item Number / Title [DODIC]: National Technical Nuclear Forensics Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N A - J U L A U G - S E P 1 0 1 1 0 1 0 1 1 0 1 1 0 1 1 1 0 1 1 1 0 1 1 1 0 1 1 1 0 1 1 1 0 1 1 1 0 1 1 1 0 1 1 1 0 1 1 1 0 1 1 0 1 1 1 0 1 1 1 0 1 1 1 0 1 Minor Install / Site Upgrade 3 18 2025 AF A - - 1 0 - - 1 0 Detailed Installation Plan 19 19 2026 AF A - Detailed Installation Plan 20 20 2027 AF Minor Install / Site Upgrade 4 21 2026 AF Minor Install / Site Upgrade 5 22 2026 AF Minor Install / Site Upgrade 6 23 2026 AF Minor Install / Site Upgrade 7 24 2026 AF Minor Install / Site Upgrade 8 25 2026 AF Minor Install / Site Upgrade 9 26 2026 AF Detailed Installation Plan 21 27 2027 AF Detailed Installation Plan 22 28 2027 AF Installation of Sensors 16 29 2026 AF A - 1 Installation of Sensors 17 30 2027 AF Installation of Sensors 18 31 2027 AF Installation of Sensors 19 32 2027 AF Installation of Sensors 20 33 2027 AF 1 O C T N O V LI 834010 - General Information Technology Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 22 of 66 S E P O C T N O V D E C J A N F E B P-1 Line #29 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 268 === page 305 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: National Technical Nuclear Forensics Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Fiscal Year 2026 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Installation of Sensors 21 34 2027 AF 1 0 1 1 0 1 1 Installation of Sensors 22 35 2027 AF 1 O C T N O V LI 834010 - General Information Technology Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 23 of 66 S E P O C T N O V D E C J A N F E B P-1 Line #29 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 269 === page 306 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: National Technical Nuclear Forensics Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Sensor Type 7 1 2025 AF 6 1 5 - - 1 - 1 - 1 - - 1 - 1 0 1 1 0 1 0 1 - 1 0 1 0 1 - 1 0 1 0 1 - - 1 0 1 - - - - 1 0 1 - - - - - - 1 0 1 - - - - - - 1 1 0 1 0 1 1 1 0 1 0 1 1 1 0 0 1 1 0 0 1 1 0 0 1 1 0 0 Installation of Sensors 7 2 2023 AF 0 Installation of Sensors 8 3 2025 AF Installation of Sensors 9 4 2025 AF Installation of Sensors 10 5 2025 AF 1 0 Installation of Sensors 11 6 2025 AF 1 0 Installation of Sensors 12 7 2025 AF 1 0 Installation of Sensors 13 8 2025 AF - - 1 0 Detailed Installation Plan 14 9 2025 AF 0 Installation of Sensors 14 10 2026 AF - - - - - - - - - 1 0 Detailed Installation Plan 15 11 2025 AF 0 Installation of Sensors 15 12 2026 AF - - - - - - - - - - 1 0 Detailed Installation Plan 16 13 2026 AF Detailed Installation Plan 17 14 2026 AF Detailed Installation Plan 18 15 2026 AF Minor Install / Site Upgrade 1 16 2025 AF Minor Install / Site Upgrade 2 O C T N O V LI 834010 - General Information Technology Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 24 of 66 S E P O C T N O V D E C J A N F E B P-1 Line #29 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 270 === page 307 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY 17 2025 SERVICE AF PROC QTY Item Number / Title [DODIC]: National Technical Nuclear Forensics Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1 1 0 0 1 1 0 0 1 1 0 0 1 0 1 A - - 1 0 1 A - - 1 0 1 1 0 1 1 0 1 1 0 1 1 0 1 1 0 1 1 0 1 1 0 1 - - - 1 0 1 A - - 1 0 1 1 0 1 1 0 1 Minor Install / Site Upgrade 3 18 2025 AF Detailed Installation Plan 19 19 2026 AF Detailed Installation Plan 20 20 2027 AF - - 1 0 Minor Install / Site Upgrade 4 21 2026 AF 1 0 Minor Install / Site Upgrade 5 22 2026 AF A - - 1 0 Minor Install / Site Upgrade 6 23 2026 AF A - - 1 0 Minor Install / Site Upgrade 7 24 2026 AF A - - 1 0 Minor Install / Site Upgrade 8 25 2026 AF A - - 1 0 Minor Install / Site Upgrade 9 26 2026 AF A - - 1 0 Detailed Installation Plan 21 27 2027 AF A - - - - 1 0 A - - - - - - - - - - - - - - - - - - - - - - A - - - - - - - - - - - - A - - - - - - - - - Detailed Installation Plan 22 28 2027 AF 1 0 Installation of Sensors 16 29 2026 AF 1 0 Installation of Sensors 17 30 2027 AF 1 0 Installation of Sensors 18 31 2027 AF 1 0 Installation of Sensors 19 32 2027 AF - - - 1 0 Installation of Sensors 20 33 2027 AF A O C T N O V LI 834010 - General Information Technology Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 25 of 66 S E P O C T N O V D E C J A N F E B P-1 Line #29 M A R A P R M A Y J U N 1 J U L 0 A U G S E P Volume 1 - 271 === page 308 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: National Technical Nuclear Forensics Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Installation of Sensors 21 34 2027 AF 1 0 1 1 0 1 A - - - - - - - - - - - - 1 0 Installation of Sensors 22 35 2027 AF A O C T N O V LI 834010 - General Information Technology Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 26 of 66 S E P O C T N O V D E C J A N F E B P-1 Line #29 M A R A P R M A Y J U N J U L A U G 1 S E P Volume 1 - 272 0 === page 309 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: National Technical Nuclear Forensics Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Honeywell FM&T, LLC Kansas City, MO 1 6 6 0 0 0 0 30 11 13 24 2 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 30 34 12 46 0 0 0 0 3 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 30 15 11 26 0 0 0 0 4 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 30 15 11 26 0 0 0 0 5 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 30 16 11 27 0 0 0 0 6 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 30 17 12 29 0 0 0 0 7 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 30 19 12 31 0 0 0 0 8 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 30 21 12 33 0 0 0 0 9 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 30 7 4 11 0 0 0 0 10 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 30 10 12 22 0 0 0 0 11 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 30 12 4 16 0 0 0 0 12 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 30 11 12 23 0 0 0 0 13 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 30 4 3 7 0 0 0 0 14 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 30 4 3 7 0 0 0 0 LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 27 of 66 P-1 Line #29 Volume 1 - 273 === page 310 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: National Technical Nuclear Forensics Procurement Leadtime (Months) Initial MSR For 2027 1-8-5 For 2027 MAX For 2027 15 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 30 6 3 9 0 0 0 0 16 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 30 17 2 19 0 0 0 0 17 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 30 20 2 22 0 0 0 0 18 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 30 22 2 24 0 0 0 0 19 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 30 9 3 12 0 0 0 0 20 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 0 1 4 5 0 0 0 0 21 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 30 13 2 15 0 0 0 0 22 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 30 15 2 17 0 0 0 0 23 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 30 16 2 18 0 0 0 0 24 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 30 18 2 20 0 0 0 0 25 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 30 20 2 22 0 0 0 0 26 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 30 22 2 24 0 0 0 0 27 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 0 3 4 7 0 0 0 0 LI 834010 - General Information Technology Air Force ALT After Oct 1 Reorder ALT Prior to Oct 1 Manufacturer Name - Location Manufacturing PLT UNCLASSIFIED Page 28 of 66 Total After Oct 1 ALT Prior to Oct 1 P-1 Line #29 ALT After Oct 1 Manufacturing PLT Total After Oct 1 Volume 1 - 274 === page 311 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: National Technical Nuclear Forensics Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 28 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 0 5 4 9 0 0 0 0 29 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 30 12 12 24 0 0 0 0 30 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 0 1 12 13 0 0 0 0 31 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 0 3 12 15 0 0 0 0 32 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 0 6 12 18 0 0 0 0 33 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 0 10 12 22 0 0 0 0 34 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 0 11 12 23 0 0 0 0 35 Applied Research Associates, Inc. Albuquerque, NM 1 1 1 0 12 12 24 0 0 0 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 29 of 66 P-1 Line #29 Volume 1 - 275 === page 312 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Joint Simulation Environment (JSE) MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 Procurement Quantity (Units in Each) - - Gross/Weapon System Cost ($ in Millions) - 79.535 Less PY Advance Procurement ($ in Millions) - - Net Procurement (P-1) ($ in Millions) - 79.535 Plus CY Advance Procurement ($ in Millions) - - Total Obligation Authority ($ in Millions) - 79.535 FY 2027 Base FY 2027 OOC - - - 10.497 - 10.497 105.610 105.610 - - - 10.497 - 10.497 105.610 FY 2027 Total - - - 10.497 - 10.497 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Joint Simulation Environment (JSE) Cost Non Recurring Cost Physical Hardware (Network Infrastructure, Storage, Computer) - - - 66.459 1 66.459 91.982 1 91.982 - - - - 13.076 1 13.076 13.628 1 13.628 10.497 Subtotal: Non Recurring Cost - - - - - 79.535 - - 105.610 - Subtotal: Hardware - Joint Simulation Environment (JSE) Cost - - - - - 79.535 - - 105.610 Gross/Weapon System Cost - - - - - 79.535 - - 105.610 Joint Integrated Test and Training Center (†) Infrastructure (†) - - - - - - 10.497 - - - 10.497 - 10.497 - - - - - 10.497 - - 10.497 - - - - - 10.497 - - 10.497 - - - - - 10.497 1 - - 1 10.497 indicates the presence of a P-5a LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 30 of 66 P-1 Line #29 Volume 1 - 276 === page 313 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements Joint Integrated Test and Training Center Infrastructure (†) Joint Integrated Test and Training Center Infrastructure (†) Joint Integrated Test and Training Center Infrastructure (†) (†) O O C P-1 Line Item Number / Title: 834010 / General Information Technology Item Number / Title [DODIC]: Joint Simulation Environment (JSE) FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) 2025 DLA / DLA MIPR AFLCMC/WN - Training Jun 2025 Jan 2026 1 13.076 Y 2026 DLA / DLA MIPR AFLCMC/WN - Training May 2026 Dec 2026 1 13.628 Y 2027 DLA / DLA MIPR AFLCMC/WN - Training Jan 2027 Sep 2027 1 10.497 Y Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 31 of 66 P-1 Line #29 Volume 1 - 277 === page 314 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Joint Simulation Environment (JSE) Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Joint Integrated Test and Training Center Infrastructure 1 2025 AF 1 0 1 1 2026 AF 1 0 1 1 2027 AF 1 0 1 A - - - - - - - 1 0 A - - - - - 1 1 O C T N O V LI 834010 - General Information Technology Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 32 of 66 S E P O C T N O V D E C J A N F E B P-1 Line #29 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 278 === page 315 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Joint Simulation Environment (JSE) Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Joint Integrated Test and Training Center Infrastructure 1 2025 AF 1 1 0 1 2026 AF 1 0 1 1 2027 AF 1 0 1 0 - - 1 0 A - O C T N O V LI 834010 - General Information Technology Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 33 of 66 1 S E P 0 O C T N O V D E C J A N F E B P-1 Line #29 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 279 === page 316 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: Joint Simulation Environment (JSE) Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 DLA - DLA MSR For 2027 1-8-5 For 2027 MAX For 2027 1 1 1 ALT Prior to Oct 1 ALT After Oct 1 1 Reorder Manufacturing PLT 4 8 Total After Oct 1 ALT Prior to Oct 1 12 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 34 of 66 P-1 Line #29 Volume 1 - 280 0 === page 317 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Distributed Training and Exercises MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 0.356 0.346 0.365 - 0.365 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.356 0.346 0.365 - 0.365 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.356 0.346 0.365 - 0.365 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Distributed Training and Exercises Cost Recurring Cost Wargaming Information (†) Environment (WIE) Subtotal: Recurring Cost - - - 0.356 1 0.356 0.346 1 0.346 0.365 1 0.365 - - - 0.365 1 0.365 - - - - - 0.356 - - 0.346 - - 0.365 - - - - - 0.365 Subtotal: Hardware Distributed Training and Exercises Cost - - - - - 0.356 - - 0.346 - - 0.365 - - - - - 0.365 Gross/Weapon System Cost - - - - - 0.356 - - 0.346 - - 0.365 - - - - - 0.365 (†) indicates the presence of a P-5a LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 35 of 66 P-1 Line #29 Volume 1 - 281 === page 318 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements Wargaming Information Environment (WIE) (†) Wargaming Information Environment (WIE) (†) Wargaming Information Environment (WIE) (†) (†) O O C P-1 Line Item Number / Title: 834010 / General Information Technology Item Number / Title [DODIC]: Distributed Training and Exercises FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) 2025 Blue Force Inc. / JB Andrews PO AFDW Oct 2025 Nov 2025 1 0.356 Y 2026 TBD / JB Andrews TBD AFDW Oct 2026 Nov 2026 1 0.346 Y 2027 TBD / JB Andrews TBD AFDW Sep 2026 Nov 2027 1 0.365 Y Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 36 of 66 P-1 Line #29 Volume 1 - 282 === page 319 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Distributed Training and Exercises Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Wargaming Information Environment (WIE) 1 2025 AF 1 0 1 2 2026 AF 1 0 1 2 2027 AF 1 0 1 A - 1 0 A A - O C T N O V LI 834010 - General Information Technology Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 37 of 66 S E P 1 O C T 0 N O V D E C J A N F E B P-1 Line #29 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 283 1 === page 320 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Distributed Training and Exercises Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Wargaming Information Environment (WIE) 1 2025 AF 1 1 0 2 2026 AF 1 1 0 2 2027 AF 1 0 1 0 0 O C T 1 N O V LI 834010 - General Information Technology Air Force 0 D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 38 of 66 S E P O C T N O V D E C J A N F E B P-1 Line #29 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 284 === page 321 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: Distributed Training and Exercises Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 1 1 1 Blue Force Inc. - JB Andrews 2 TBD - JB Andrews ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 0 0 0 0 0 0 0 0 0 0 0 0 1 0 14 14 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 39 of 66 P-1 Line #29 Volume 1 - 285 === page 322 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: Full Combat Mission Training MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC - - - 69.671 - 69.671 - - - - 7.762 69.671 - 69.671 - - - - 7.762 69.671 - 69.671 Procurement Quantity (Units in Each) - 1 9 Gross/Weapon System Cost ($ in Millions) - 0.849 7.762 Less PY Advance Procurement ($ in Millions) - - Net Procurement (P-1) ($ in Millions) - 0.849 Plus CY Advance Procurement ($ in Millions) - - Total Obligation Authority ($ in Millions) - 0.849 FY 2027 Total (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - 0.849 0.862 - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Full Combat Mission Training Cost Non Recurring Cost Expanding and Upgrading F-35 Distributed Mission Operations - - - 0.849 Subtotal: Non Recurring Cost 1 0.849 0.862 9 7.762 - - 69.671 - - - - - 69.671 - - - - - 0.849 - - 7.762 - - 69.671 - - - - - 69.671 Subtotal: Hardware - Full Combat Mission Training Cost - - - - - 0.849 - - 7.762 - - 69.671 - - - - - 69.671 Gross/Weapon System Cost - - - 0.849 0.849 0.862 7.762 - - 69.671 - - - - - 69.671 LI 834010 - General Information Technology Air Force 1 9 UNCLASSIFIED Page 40 of 66 P-1 Line #29 Volume 1 - 286 === page 323 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Intel Data Applications MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 7.493 7.641 7.904 - 7.904 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 7.493 7.641 7.904 - 7.904 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 7.493 7.641 7.904 - 7.904 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Software - Intel Data Applications Cost Non Recurring Cost Intel Data Applications - - - - - 7.493 - - 7.641 - - 7.904 - - - - - 7.904 Subtotal: Non Recurring Cost - - - - - 7.493 - - 7.641 - - 7.904 - - - - - 7.904 Subtotal: Software - Intel Data Applications Cost - - - - - 7.493 - - 7.641 - - 7.904 - - - - - 7.904 Gross/Weapon System Cost - - - - - 7.493 - - 7.641 - - 7.904 - - - - - 7.904 LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 41 of 66 P-1 Line #29 Volume 1 - 287 === page 324 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: Security and Investigative Activities MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC - - - 5.344 - 5.344 - - - - 5.125 5.344 - 5.344 - - - - 5.125 5.344 - 5.344 Procurement Quantity (Units in Each) - 1 1 Gross/Weapon System Cost ($ in Millions) - 5.030 5.125 Less PY Advance Procurement ($ in Millions) - - Net Procurement (P-1) ($ in Millions) - 5.030 Plus CY Advance Procurement ($ in Millions) - - Total Obligation Authority ($ in Millions) - 5.030 FY 2027 Total (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.000 0.000 - - - Gross/Weapon System Unit Cost ($ in Millions) - 5.030 5.125 - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Software - Security and Investigative Activities Cost Recurring Cost (†) - - - 5.030 5.030 5.125 5.125 5.344 5.344 - - - 5.344 Subtotal: Recurring Cost - - - - - 5.030 - - 5.125 - - 5.344 - - - - - 5.344 Subtotal: Software - Security and Investigative Activities Cost - - - - - 5.030 - - 5.125 - - 5.344 - - - - - 5.344 Gross/Weapon System Cost - - - 5.030 5.030 5.125 5.125 - - 5.344 - - - - - 5.344 28588007 (†) 1 1 1 1 1 1 5.344 indicates the presence of a P-5a LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 42 of 66 P-1 Line #29 Volume 1 - 288 === page 325 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (†) O O C P-1 Line Item Number / Title: 834010 / General Information Technology FY Contractor and Location Method/Type or Funding Vehicle Item Number / Title [DODIC]: Security and Investigative Activities Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) 28588007 (†) 2025 Various / Various Various Hanscom AFB Jan 2025 Jan 2025 1 5.030 N Dec 2024 28588007 (†) 2026 Various / Various Various Hanscom AFB Jan 2026 Jan 2026 1 5.125 N Dec 2025 28588007 (†) 2027 Various / Various Various Hanscom AFB Jan 2027 Jan 2027 1 5.344 N Dec 2026 RFP Issue Date indicates the presence of a P-21 LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 43 of 66 P-1 Line #29 Volume 1 - 289 === page 326 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Security and Investigative Activities Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Fiscal Year 2026 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 28588007 1 2025 AF 1 0 1 1 2026 AF 1 0 1 1 2027 AF 1 0 1 A1 0 A1 0 1 O C T N O V LI 834010 - General Information Technology Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 44 of 66 S E P O C T N O V D E C J A N F E B P-1 Line #29 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 290 === page 327 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Security and Investigative Activities Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 28588007 1 2025 AF 1 1 0 1 2026 AF 1 1 0 1 2027 AF 1 0 1 0 0 A1 O C T N O V LI 834010 - General Information Technology Air Force D E C J A N 0 F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 45 of 66 S E P O C T N O V D E C J A N F E B P-1 Line #29 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 291 === page 328 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: Security and Investigative Activities Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Various - Various MSR For 2027 1-8-5 For 2027 MAX For 2027 1 1 5 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 1 Manufacturing PLT 4 Total After Oct 1 0 Remarks: None "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 46 of 66 P-1 Line #29 Volume 1 - 292 4 === page 329 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Mission Partner Environments MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 20.093 2.086 0.000 - 0.000 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 20.093 2.086 0.000 - 0.000 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 20.093 2.086 0.000 - 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Mission Partner Environments Cost Recurring Cost Non-DWCF Electronic and Telecommunication Equipment - - - 20.093 1 20.093 2.086 1 2.086 0.000 1 0.000 - - - 0.000 1 0.000 Subtotal: Recurring Cost - - - - - 20.093 - - 2.086 - - 0.000 - - - - - 0.000 Subtotal: Hardware - Mission Partner Environments Cost - - - - - 20.093 - - 2.086 - - 0.000 - - - - - 0.000 Gross/Weapon System Cost - - - - - 20.093 - - 2.086 - - 0.000 - - - - - 0.000 Remarks: The FY 2027 funding procures hardware and software to support the rationalization, consolidation and modernization of current or future operational MPE Capabilities in support of C2 and intelligence information-sharing. LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 47 of 66 P-1 Line #29 Volume 1 - 293 === page 330 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Communications and Information Technology MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 2.067 0.184 0.192 - 0.192 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 2.067 0.184 0.192 - 0.192 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 2.067 0.184 0.192 - 0.192 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Communications and Information Technology Cost Recurring Cost Communications and Information Technology - - - - - 2.067 - - 0.184 0.191 1 0.192 - - - 0.192 1 0.192 Subtotal: Recurring Cost - - - - - 2.067 - - 0.184 - - 0.192 - - - - - 0.192 Subtotal: Hardware Communications and Information Technology Cost - - - - - 2.067 - - 0.184 - - 0.192 - - - - - 0.192 Gross/Weapon System Cost - - - - - 2.067 - - 0.184 - - 0.192 - - - - - 0.192 LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 48 of 66 P-1 Line #29 Volume 1 - 294 === page 331 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Tactical Data Networks Enterprise MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 4.727 0.000 0.000 - 0.000 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 4.727 0.000 0.000 - 0.000 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 4.727 0.000 0.000 - 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - TDL - PAM Cost Non Recurring Cost - - - 0.163 29 4.727 - - 0.000 - - 0.000 - - - - - 0.000 Subtotal: Non Recurring Cost TDL-PAM - - - - - 4.727 - - 0.000 - - 0.000 - - - - - 0.000 Subtotal: Hardware - TDL PAM Cost - - - - - 4.727 - - 0.000 - - 0.000 - - - - - 0.000 Gross/Weapon System Cost - - - - - 4.727 - - 0.000 - - 0.000 - - - - - 0.000 LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 49 of 66 P-1 Line #29 Volume 1 - 295 === page 332 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Logistics Support Activities MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 2.335 2.378 2.482 - 2.482 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 2.335 2.378 2.482 - 2.482 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 2.335 2.378 2.482 - 2.482 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Logistics Support Activities Cost Recurring Cost Network Hardware Network Power Hardware (†) - - - 1.786 1 1.786 - - 2.378 - - 2.482 - - - - - 2.482 - - - 0.549 1 0.549 - - - - - - - - - - - - Subtotal: Recurring Cost - - - - - 2.335 - - 2.378 - - 2.482 - - - - - 2.482 Subtotal: Hardware Logistics Support Activities Cost - - - - - 2.335 - - 2.378 - - 2.482 - - - - - 2.482 Gross/Weapon System Cost - - - - - 2.335 - - 2.378 - - 2.482 - - - - - 2.482 (†) indicates the presence of a P-5a LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 50 of 66 P-1 Line #29 Volume 1 - 296 === page 333 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 O O C Cost Elements (†) Network Power Hardware (†) P-1 Line Item Number / Title: 834010 / General Information Technology FY Contractor and Location Method/Type or Funding Vehicle 2025 TBD / TBD C / TBD Location of PCO AFLCMC/HI - Business & Enterprise Systems Item Number / Title [DODIC]: Logistics Support Activities Award Date Date of First Delivery Mar 2025 Apr 2025 Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) 1 0.549 Y RFP Issue Date Feb 2025 indicates the presence of a P-21 LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 51 of 66 P-1 Line #29 Volume 1 - 297 === page 334 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Logistics Support Activities Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Fiscal Year 2026 Calendar Year 2025 O C T N O V D E C J A N F E B O C T N O V D E C J A N F E B M A R A P R Calendar Year 2026 M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Network Power Hardware 1 2025 AF 1 0 1 A - LI 834010 - General Information Technology Air Force M A R 1 A P R 0 UNCLASSIFIED Page 52 of 66 P-1 Line #29 Volume 1 - 298 === page 335 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: Logistics Support Activities Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 TBD - TBD MSR For 2027 1-8-5 For 2027 MAX For 2027 1 1 1 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 1 Manufacturing PLT 6 Total After Oct 1 1 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 53 of 66 P-1 Line #29 Volume 1 - 299 7 === page 336 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: AF LVC Operational Training (LVC-OT) MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 12.107 12.339 12.866 - 12.866 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 12.107 12.339 12.866 - 12.866 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 12.107 12.339 12.866 - 12.866 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - AF LVC Operational Training LVC-OT Cost Non Recurring Cost Operations Center Equipment - - - - - 12.000 - - - - - - - - - - - - Training System Integration Equipment - - - - - - - - 12.259 - - 1.161 - - - - - 1.161 On Premise Equipment - - - - - - - - - 0.547 21 11.487 - - - 0.547 21 11.487 - - - - - 12.000 - - 12.259 - - 12.648 - - - - - 12.648 - - - - - 12.000 - - 12.259 - - 12.648 - - - - - 12.648 Subtotal: Non Recurring Cost Subtotal: Hardware - AF LVC Operational Training LVC-OT Cost Support - AF LVC Operational Training LVC-OT Cost Program Support Costs (PSC) Other Government Costs - - - - - 0.107 - - 0.080 - - 0.218 - - - - - 0.218 Subtotal: Support - AF LVC Operational Training LVCOT Cost - - - - - 0.107 - - 0.080 - - 0.218 - - - - - 0.218 Gross/Weapon System Cost - - - - - 12.107 - - 12.339 - - 12.866 - - - - - 12.866 Remarks: SIMULATOR COMMON ARCHITECTURE REQUIREMENTS AND STANDARDS (SCARS): FY2027 efforts include, but are not limited to, establishing and maintaining system site connections to the Security Operations Centers (SOCs) to centrally provide cybersecurity maintenance (e.g., scanning, patching, vulnerability assessments), helping to mitigate cybersecurity vulnerabilities, address cybersecurity LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 54 of 66 P-1 Line #29 Volume 1 - 300 === page 337 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 P-1 Line Item Number / Title: 834010 / General Information Technology ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: AF LVC Operational Training (LVC-OT) MDAP/MAIS Code: requirements, and meet Authority to Operate requirements. FY2027 may also include the hardware and software for the SCARS SOCs, supporting the transition to a Government SOC able to support programs at multiple classification levels. Additionally, FY2027 efforts may include the purchase of equipment and software licenses to expand capabilities at training system integration labs and operational training sites. FY2027 efforts may also include, but are not limited to, the deployment of hardware to support training system virtualization into the SCARS Common Architecture enhancing the ability of aircraft Training Systems to maintain concurrency with aircraft Operational Flight Program updates, ease modernization of training systems, and reduce vendor hardware dependencies. Hardware and software will include, but is not limited to, tools that improve SCARS effectiveness and Air Force training systems operations by enabling delivery and integration of capabilities and promote the use of standardization and automation. Efforts may also support procurement of common applications such as a geospatial data repository for use across Training Systems. Funding may also be used to address Diminishing Manufacturing Source (DMS) issues, obsolescence resolution and similar emerging requirements, and program support activities. Funding for this exhibit contained in PE 0801380F. LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 55 of 66 P-1 Line #29 Volume 1 - 301 === page 338 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Recruit Training Units MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 0.900 0.916 0.956 - 0.956 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.900 0.916 0.956 - 0.956 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.900 0.916 0.956 - 0.956 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Recruit Training Units Cost Recurring Cost Recruit Training (†) Units - - - 0.900 1 0.900 0.916 1 0.916 - - 0.956 - - - - - 0.956 Subtotal: Recurring Cost - - - - - 0.900 - - 0.916 - - 0.956 - - - - - 0.956 Subtotal: Hardware - Recruit Training Units Cost - - - - - 0.900 - - 0.916 - - 0.956 - - - - - 0.956 Gross/Weapon System Cost - - - - - 0.900 - - 0.916 - - 0.956 - - - - - 0.956 (†) indicates the presence of a P-5a LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 56 of 66 P-1 Line #29 Volume 1 - 302 === page 339 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements Recruit Training Units Recruit Training Units O O C P-1 Line Item Number / Title: 834010 / General Information Technology Method/Type or Funding Vehicle Item Number / Title [DODIC]: Recruit Training Units Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty RFP Issue Date FY Contractor and Location 2025 Red Peak Technical Services, LLC / JBSA Lackland Various AETC Aug 2024 Aug 2024 1 0.900 Y Jun 2024 2026 Red Peak Technical Services, LLC / JBSA Lackland Various AETC Aug 2025 Aug 2025 1 0.916 Y Jun 2025 LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 57 of 66 P-1 Line #29 (Each) Volume 1 - 303 === page 340 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Service Academies MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) - 1 1 1 - 1 Gross/Weapon System Cost ($ in Millions) - 4.532 2.799 2.870 - 2.870 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 4.532 2.799 2.870 - 2.870 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 4.532 2.799 2.870 - 2.870 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - 4.532 2.799 2.870 - 2.870 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Service Academies Cost Non Recurring Cost USAFA WIFI Expansion - - - 4.532 Subtotal: Non Recurring Cost - - - - Subtotal: Hardware - Service Academies Cost - - - - Gross/Weapon System Cost - - - 4.532 LI 834010 - General Information Technology Air Force 1 4.532 - - 2.799 2.870 - 4.532 - - 2.799 - - 4.532 - - 2.799 - 4.532 2.799 2.799 2.870 1 1 UNCLASSIFIED Page 58 of 66 1 2.870 - - - 2.870 - 2.870 - - - - - 2.870 - 2.870 - - - - - 2.870 2.870 - - - 2.870 1 P-1 Line #29 1 1 2.870 2.870 Volume 1 - 304 === page 341 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: General Skill Training MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 0.744 0.757 0.788 - 0.788 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.744 0.757 0.788 - 0.788 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.744 0.757 0.788 - 0.788 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Software - General Skill Training Cost Recurring Cost General Skill Training - - - 0.744 0.744 0.757 0.757 - - 0.788 - - - - - 0.788 Subtotal: Recurring Cost - - - - - 0.744 - - 0.757 - - 0.788 - - - - - 0.788 Subtotal: Software - General Skill Training Cost - - - - - 0.744 - - 0.757 - - 0.788 - - - - - 0.788 Gross/Weapon System Cost - - - - - 0.744 - - 0.757 - - 0.788 - - - - - 0.788 LI 834010 - General Information Technology Air Force 1 1 UNCLASSIFIED Page 59 of 66 P-1 Line #29 Volume 1 - 305 === page 342 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Professional Military Education MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 1.082 1.104 1.151 - 1.151 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 1.082 1.104 1.151 - 1.151 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 1.082 1.104 1.151 - 1.151 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Professional Military Education Cost Recurring Cost IT System - - - 0.135 1.082 - - 1.104 - - 1.151 - - - - - 1.151 - - - - - 1.082 - - 1.104 - - 1.151 - - - - - 1.151 Subtotal: Hardware Professional Military Education Cost - - - - - 1.082 - - 1.104 - - 1.151 - - - - - 1.151 Gross/Weapon System Cost - - - - - 1.082 - - 1.104 - - 1.151 - - - - - 1.151 Subtotal: Recurring Cost LI 834010 - General Information Technology Air Force 8 UNCLASSIFIED Page 60 of 66 P-1 Line #29 Volume 1 - 306 === page 343 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Other Professional Education MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 0.522 0.532 0.555 - 0.555 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.522 0.532 0.555 - 0.555 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.522 0.532 0.555 - 0.555 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Software - Other Professional Education Cost Recurring Cost - - - - - 0.522 - - 0.532 - - 0.555 - - - - - 0.555 Subtotal: Recurring Cost Software - - - - - 0.522 - - 0.532 - - 0.555 - - - - - 0.555 Subtotal: Software - Other Professional Education Cost - - - - - 0.522 - - 0.532 - - 0.555 - - - - - 0.555 Gross/Weapon System Cost - - - - - 0.522 - - 0.532 - - 0.555 - - - - - 0.555 LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 61 of 66 P-1 Line #29 Volume 1 - 307 === page 344 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Air Force Studies and Analysis Agency MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 0.000 0.000 5.608 - 5.608 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.000 0.000 5.608 - 5.608 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.000 0.000 5.608 - 5.608 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Support - Air Force Studies and Analysis Agency Cost Air Force Studies and Analysis Agency - - - - - 0.000 - - 0.000 - - 5.608 - - - - - 5.608 Subtotal: Support - Air Force Studies and Analysis Agency Cost - - - - - 0.000 - - 0.000 - - 5.608 - - - - - 5.608 Gross/Weapon System Cost - - - - - 0.000 - - 0.000 - - 5.608 - - - - - 5.608 LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 62 of 66 P-1 Line #29 Volume 1 - 308 === page 345 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Contracting Information Technology System MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC - - - 0.000 - 0.000 - - - - 2.321 0.000 - 0.000 - - - - 2.321 0.000 - 0.000 Procurement Quantity (Units in Each) - 1 1 Gross/Weapon System Cost ($ in Millions) - 1.509 2.321 Less PY Advance Procurement ($ in Millions) - - Net Procurement (P-1) ($ in Millions) - 1.509 Plus CY Advance Procurement ($ in Millions) - - Total Obligation Authority ($ in Millions) - 1.509 FY 2027 Total (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - 1.509 2.321 - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Software - Contracting Information Technology System Cost Non Recurring Cost (†) - - - 1.509 Subtotal: Non Recurring Cost - - - - Subtotal: Software Contracting Information Technology System Cost - - - - Gross/Weapon System Cost - - - 1.509 Software Licenses 1 1.509 2.321 - 1.509 - - 1.509 - 1.509 2.321 1 1 2.321 - - 0.000 - - - - - 0.000 - 2.321 - - 0.000 - - - - - 0.000 - 2.321 - - 0.000 - - - - - 0.000 2.321 - - 0.000 - - - - - 0.000 1 Remarks: FY 2026 funds support the acquisition of approximately 775 end user licenses. (†) indicates the presence of a P-5a LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 63 of 66 P-1 Line #29 Volume 1 - 309 === page 346 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (†) O O C P-1 Line Item Number / Title: 834010 / General Information Technology FY Contractor and Location Method/Type or Funding Vehicle Item Number / Title [DODIC]: Contracting Information Technology System Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date Software Licenses (†) 2025 Appian Corporation / Reston,VA SS / FFP WPAFB, OH Nov 2024 Feb 2025 1 1.509 Y Oct 2024 Software Licenses (†) 2026 Appian Corporation / Reston,VA SS / FFP WPAFB, OH Nov 2025 Feb 2026 1 2.321 Y Oct 2025 indicates the presence of a P-21 Remarks: FY 2027 requires $0 Procurement funding. LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 64 of 66 P-1 Line #29 Volume 1 - 310 === page 347 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Contracting Information Technology System Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Fiscal Year 2026 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Software Licenses 1 2025 AF 1 0 1 1 2026 AF 1 0 1 A - - - 1 0 A - O C T N O V LI 834010 - General Information Technology Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 65 of 66 S E P O C T N O V D E C J A N 1 F E B P-1 Line #29 0 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 311 === page 348 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834010 / General Information Technology Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: Contracting Information Technology System Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 1 1 1 Appian Corporation Reston,VA ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 1 Manufacturing PLT 2 Total After Oct 1 3 Remarks: FY 2027 requires $0 Procurement funding. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 834010 - General Information Technology Air Force UNCLASSIFIED Page 66 of 66 P-1 Line #29 Volume 1 - 312 5 === page 349 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834040 / Af Global Command & Control Sys Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 3.275 1.946 1.947 0.000 - 0.000 0.000 0.000 0.000 0.000 - 7.168 Total - - - - - - - - - - - - 3.275 1.946 1.947 0.000 - 0.000 0.000 0.000 0.000 0.000 - 7.168 - - - - - - - - - - - - 3.275 1.946 1.947 0.000 - 0.000 0.000 0.000 0.000 0.000 - 7.168 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: GLOBAL COMMAND AND CONTROL SYSTEM AIR FORCE (GCCS-AF): The GCCS-AF program provides the common AF infrastructure hardware and software necessary to pass AF command and control (C2) data among commands, their components, and the joint GCCS. This program procures GCCS components which include, but are not limited to, items such as servers, commercial-off-the-shelf (COTS) software, and associated peripherals to provide users with the full suite of joint baseline capability (including the common operating picture and Integrated Imagery & Intelligence). GCCS-AF is integrated at the following locations to establish full joint connectivity and operational capability across the spectrum of intelligence, operations, war planning, manpower, and logistics: AF-supported war-fighting commands, AF critical sites, Headquarters United States Air Force, Major Command headquarters (MAJCOM), Numbered Air Forces, Wings, Air National Guard (ANG) bases, Air Force Reserve (AFR) bases, and remote sites. Each site will comply with current Air Force and Department of War (DoW) network initiatives by employing a standardized interface among AF base-level classified C2 networks, AF base-level network control centers, and the joint Defense Information Systems Agency (DISA) Secret Internet Protocol Router Network (SIPRNET). This program provides a flexible open system and distributed C2 architecture necessary to support the joint GCCS. GCCS supports AF operations by installing and upgrading a site's classified C2 system through extensive use of COTS technology that adheres to AF command and control, communications, and computer architectures and standards. The 3.51M increase in FY27 allows for the procurement of additional server hardware to meet the tech refresh cycle requirements and ensure GCCS-AF sites are maintained on the GCCS-J baseline. Budget line-item consolidation (BLI): WSC 834040 moved to WSC 834180 in FY2027 Funding for the exhibit contained in PE 0303150F: GLOBAL COMMAND AND CONTROL SYSTEM LI 834040 - Af Global Command & Control Sys Air Force UNCLASSIFIED Page 1 of 3 P-1 Line #30 Volume 1 - 313 === page 350 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834040 / Af Global Command & Control Sys Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Global Command and Control System P-40 Total Gross/Weapon System Cost Subexhibits ID CD A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 3.275 - / 1.946 - / 1.947 - / 0.000 - / - - / 0.000 - / 3.275 - / 1.946 - / 1.947 - / 0.000 - / - - / 0.000 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: GLOBAL COMMAND AND CONTROL SYSTEM AIR FORCE (GCCS-AF): Funding in FY2027 will procure additional hardware servers to support the continued multi-year replacement of hardware to meet the DISA-J software support requirements for the GCCS C2 system. LI 834040 - Af Global Command & Control Sys Air Force UNCLASSIFIED Page 2 of 3 P-1 Line #30 Volume 1 - 314 === page 351 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834040 / Af Global Command & Control Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Global Command and Control System MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 3.275 1.946 1.947 0.000 - 0.000 - - - - - - 3.275 1.946 1.947 0.000 - 0.000 - - - - - - 3.275 1.946 1.947 0.000 - 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Global Command and Control System Cost Recurring Cost GCCS-AF Server Replacement - - 0.693 - - - - - - - - 0.000 - - - - - 0.000 Subtotal: Recurring Cost - - 0.693 - - - - - - - - 0.000 - - - - - 0.000 Subtotal: Hardware - Global Command and Control System Cost - - 0.693 - - - - - - - - 0.000 - - - - - 0.000 Support - Global Command and Control System Cost PSC Contractor Services - - 2.384 - - 1.824 - - 1.828 - - 0.000 - - - - - 0.000 PSC Other Government Costs - - 0.198 - - 0.122 - - 0.119 - - 0.000 - - - - - 0.000 Subtotal: Support - Global Command and Control System Cost - - 2.582 - - 1.946 - - 1.947 - - 0.000 - - - - - 0.000 Gross/Weapon System Cost - - 3.275 - - 1.946 - - 1.947 - - 0.000 - - - - - 0.000 Remarks: Funding requirements will support the continued installation and support of HW Servers for GCCS-AF. LI 834040 - Af Global Command & Control Sys Air Force UNCLASSIFIED Page 3 of 3 P-1 Line #30 Volume 1 - 315 === page 352 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 316 === page 353 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834050 / Battlefield Airborne Communication Node (BACN) Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 0.005 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 - 0.005 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 0.005 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 - 0.005 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 0.005 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 - 0.005 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Battlefield Airborne Communication Node (BACN) provides a flexible, long-endurance, responsive airborne communications capability. BACN provides a dedicated airborne capability to conduct voice bridge translation, Tactical Data Link (TDL) gateway and TDL relay functions for beyond-line-of-sight (BLOS) data communications. The BACN airborne payload is currently controlled by ground stations that are comprised of multiple support elements: a Payload Control Element - Launch (PCE-L) and Payload Control Element - Mission (PCEM). The Rapidly Deployable Payload Control Element (RD-PCE) shelter equipment procurement has shifted to a more modular palletized equipment procurement. This equipment includes, but is not limited to, power generators, NIPR/SIPR connectivity, lightweight mobile shelters, HVAC system, various radios, antennas, Tactical Common Data Link equipment, and ancillary equipment. This effort meets Agile Combat Employment (ACE) concept for rapid employment in austere environments. The RD-PCE provides a capability that is lightweight, transportable, and is in a rapidly deployable configuration. The RD-PCE is designed to meet worldwide deployability which meets the needs of Combatant Commanders in any AoR. RD-PCE components are tailored for each individual deployment and can be easily adjusted for each mission set. Funding for this exhibit contained in PE PE 0207238F - E-11A; PE 0207610F - Battlefield Abn Comm Node (BACN); PE 0604281F - Tactical Data Networks Enterprise LI 834050 - Battlefield Airborne Communication Node ... Air Force UNCLASSIFIED Page 1 of 3 P-1 Line #31 Volume 1 - 317 === page 354 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834050 / Battlefield Airborne Communication Node (BACN) Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Tactical Data Networks Enterprise P-40 Total Gross/Weapon System Cost Subexhibits ID CD A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 0.005 - / 0.000 - / 0.000 - / - - / 0.000 - / - - / 0.005 - / 0.000 - / 0.000 - / - - / 0.000 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: This effort procures Rapidly Deployable Payload Control Element (RD-PCE) hardware/software and other equipment modifications as well as shelters and equipment required to build out, support and secure or modify BACN Payload control necessary to meet operational requirements. No budget year FY 2027 funds are requested. LI 834050 - Battlefield Airborne Communication Node ... Air Force UNCLASSIFIED Page 2 of 3 P-1 Line #31 Volume 1 - 318 === page 355 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834050 / Battlefield Airborne Communication Node (BACN) Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Tactical Data Networks Enterprise MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 0.005 0.000 0.000 - 0.000 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.005 0.000 0.000 - 0.000 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.005 0.000 0.000 - 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Tactical Data Networks Enterprise Cost Non Recurring Cost - - - 0.005 Subtotal: Non Recurring Cost None - - - - Subtotal: Hardware - Tactical Data Networks Enterprise Cost - - - Gross/Weapon System Cost - - - 0.005 - - 0.000 - - 0.000 - - - - - 0.000 - 0.005 - - 0.000 - - 0.000 - - - - - 0.000 - - 0.005 - - 0.000 - - 0.000 - - - - - 0.000 - - 0.005 - - 0.000 - - 0.000 - - - - - 0.000 LI 834050 - Battlefield Airborne Communication Node ... Air Force 1 UNCLASSIFIED Page 3 of 3 P-1 Line #31 Volume 1 - 319 === page 356 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 320 === page 357 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834070 / Mobility Command And Control Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 11.435 11.648 0.000 - 0.000 0.000 0.000 0.000 0.000 - 23.083 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 11.435 11.648 0.000 - 0.000 0.000 0.000 0.000 0.000 - 23.083 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 11.435 11.648 0.000 - 0.000 0.000 0.000 0.000 0.000 - 23.083 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: In FY 2027, PE 0401840F AMC Command and Control, WSC 834070 Mobility Command and Control efforts were transferred to WSC 834180 Samtec Communications as part of the Budget Line-Item Consolidation effort. PE 0401840F AMC Command and Control System GLOBAL MOBILITY COMMAND AND CONTROL (C2) ARCHITECTURE AIR MOBILITY COMMAND (AMC): The AMC C2 architecture is an integrated, command-wide program that supports US Air Force airlift/air refueling missions around the globe with centralized control/decentralized execution. To execute America's Global Reach mission, Air Mobility Command's 618th Air Operations Center (AOC) plans, schedules, and directs a fleet of more than 1,100 mobility aircraft. The 618th AOC operates combat delivery, strategic airlift, air refueling, and aeromedical evacuation operations around the world. MOBILITY AIR FORCE (MAF) COMMAND AND CONTROL (C2) INFRASTRUCTURE: Provides base wired/wireless infrastructure equipment supporting AMC's 618th AOC and AMC's 11 bases to assure connectivity to AMC's command and control (C2) systems and to ensure they remain operational at AMC bases and operating locations. MAF C2 Infrastructure ensures connectivity with critical Air Force systems such as the Information Transport System (ITS), Global Combat Support System (GCSS), and the Global Decision Support System (GDSS). Funding for this exhibit contained in PE 0401840F. LI 834070 - Mobility Command And Control Air Force UNCLASSIFIED Page 1 of 3 P-1 Line #32 Volume 1 - 321 === page 358 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834070 / Mobility Command And Control Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 AMC COMMAND AND CONTROL SYSTEM P-40 Total Gross/Weapon System Cost Subexhibits ID CD A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 11.435 - / 11.648 - / - - / 11.435 - / 11.648 - / - - / - / 0.000 - / - - / / 0.000 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: PE 0401840F AMC Command and Control System MOBILITY AIR FORCE (MAF) COMMAND AND CONTROL (C2) INFRASTRUCTURE: FY 2027 funding continues procurement of wired and wireless base network infrastructure equipment, including cabling, routers, bridges, hubs, repeaters, and switches. These upgrades ensure that information technology remains current and maintains interoperability with AMC C2 systems, meeting the needs of the warfighter and AMC's worldwide mobility mission. These upgrades include modernization efforts to SIPRNet to allow for cross-domain capabilities and allowing access to sensitive compartmented information, procuring warfighter NIPRNet & SIPRNet mobile laptops and zero client workstations, and procuring fiber installs, premise wiring, equipment racks, and licensing. LI 834070 - Mobility Command And Control Air Force UNCLASSIFIED Page 2 of 3 P-1 Line #32 Volume 1 - 322 === page 359 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834070 / Mobility Command And Control Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: AMC COMMAND AND CONTROL SYSTEM MDAP/MAIS Code: FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - - Gross/Weapon System Cost ($ in Millions) - 11.435 11.648 - - - Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 11.435 11.648 - - - Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 11.435 11.648 - - - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - AMC COMMAND AND CONTROL SYSTEM Cost Recurring Cost Base Network Infrastructure Equipment - - - 11.435 1 11.435 11.648 1 11.648 - - - - - - - - - Subtotal: Recurring Cost - - - - - 11.435 - - 11.648 - - - - - - - - - Subtotal: Hardware - AMC COMMAND AND CONTROL SYSTEM Cost - - - - - 11.435 - - 11.648 - - - - - - - - - Gross/Weapon System Cost - - - - - 11.435 - - 11.648 - - - - - - - - - Remarks: In FY 2027, PE 0401840F AMC Command and Control, WSC 834070 Mobility Command and Control efforts were transferred to WSC 834180 Samtec Communications as part of the Budget Line-Item Consolidation effort. LI 834070 - Mobility Command And Control Air Force UNCLASSIFIED Page 3 of 3 P-1 Line #32 Volume 1 - 323 === page 360 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 324 === page 361 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834130 / Air Force Physical Security System Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0207589F, 0604287F Line Item MDAP/MAIS Code: None Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 137.436 137.436 137.436 381.317 381.317 381.317 314.365 314.365 314.365 1,770.698 - - 1,770.698 - 1,770.698 - - 1,770.698 - 1,770.698 - 1,770.698 1,330.083 1,330.083 1,330.083 493.586 493.586 493.586 348.663 348.663 348.663 To FY 2031 Complete 354.364 354.364 354.364 Total - 5,130.512 - 5,130.512 - 5,130.512 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The Air Force Physical Security System (AFPSS) program consists of program elements that procure force protection equipment, as well as support the installation, integration and acceptance testing for base defense physical security systems, such as Integrated Base Defense Security System (IBDSS), Counter Small Unmanned Aircraft Systems (C-sUAS), and Counter-Rockets, Artillery and Mortar (C-RAM) systems, for the purpose of delivering modern and secure base defense solutions to protect people, infrastructure, facilities and the Nation's most critical war fighting assets, both in the homeland and overseas. The FY 2026 spend plan amount for Other Procurement, Air Force includes 314,365 thousand of discretionary and 96,000 thousand of mandatory (reconciliation) for a total of 411,265. AFPSS encompasses the following PEs: PE 0101110F - B-21 Raider includes Electronic Security System projects that procure commodity security equipment such as intrusion detection sensors, alarm annunciators, and surveillance systems required for B-21 Raider Special Access Program facilities. PE 0101122F - AIR LAUNCHED CRUISE MISSILE (ALCM) SECURITY SYSTEMS include commodity security equipment such as intrusion detection sensors, alarm annunciators, and surveillance systems required for nuclear warhead storage locations. PE 0101213F - MINUTEMAN SQUADRONS: No FY26 funding requested. PE 0101233F - LGM-35A SENTINEL SQUADRONS: Funds the physical security systems and associated equipment for LGM-35A Sentinel facilities to include, but not limited to, intrusion detection sensors, alarm annunciators, and surveillance systems required for Special Access Program facilities. The FY 2026 President's Budget request included 0.00 of mandatory funding. The FY 2027 request includes 0.00 of mandatory funding. PE 0101238F - LONG RANGE STANDOFF (LRSO) includes commodity security equipment such as intrusion detection sensors, alarm annunciators, and surveillance systems required for nuclear warhead storage and Special Access Programs locations. LI 834130 - Air Force Physical Security System Air Force UNCLASSIFIED Page 1 of 34 P-1 Line #33 Volume 1 - 325 === page 362 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834130 / Air Force Physical Security System Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0207589F, 0604287F Line Item MDAP/MAIS Code: None PE 0207522F - AIRBASE AIR DEFENSE SYSTEMS (ABADS) Counter Small Unmanned Aircraft System (C-sUAS) is required to provide C-sUAS system capability & continued support at existing, fielded installations to ensure the ability to detect, track, identify and defeat small unmanned aircraft systems and other rockets, artillery, and mortar threats, or other air base threats to ensure capabilities exist and remain effective. The capabilities & support procured protect AF installations, personnel, critical infrastructure at fixed sites, mobile and austere locations, and contingency and non-contingency locations worldwide. PE 0207522F- AIRBASE AIR DEFENSE SYSTEMS (ABADS) Missile Defense (MD) was originally designed as a configurable combination of Commercial Off the Shelf (COTS)/Government Off the Shelf (GOTS) sensor and Non-Kinetic Effector (NKE) technologies integrated with tailored Battle Management Command and Control (BMC2) subsystem that leverages GOTS products and Advanced Battle Management System (ABMS) systems to provide adaptive, resilient, and dedicated air defense capability. FY27 adds the integration of kinetic effectors, additional non-kinetic effectors, and active radar systems. The ABADS MD system is designed to operate independently or in concert with other local and distributed capabilities to form a multi-layered defense-in-depth, improving airbase defense and airbase resiliency. PE 0207588F - AIR BASE GROUND DEFENSE (ABGD) will procure Integrated Base Defense & expeditionary equipment that is required to provide robust force protection capabilities worldwide for: Perimeter defense, flight-line security, aircraft, intelligence, surveillance, and reconnaissance assets, critical infrastructure, sustained sortie generation and air operations. This Program Element Code (PEC) procures advanced technology force multipliers to include: night vision and thermal imagery equipment, counter sniper/battery capabilities, ground weapons, target acquisition radar, interoperable tactical communications, required command, control, & communications (C3) and protective standoff equipment for wheeled tactical (active/passive), armored, and un-armored vehicles, tactical security system, and unit/personnel protective field equipment. PE 0207589F - BASE PHYSICAL SECURITY SYSTEMS (BPSS) Integrated Base Defense Security System (IBDSS) programs and various acquisition blocks. These activities reduce the risk to AF and USSF personnel, Protection Level 1-Nuclear (PL-1N), and non-nuclear (PL-1 through PL-4) assets, (weapon systems, aircraft, command & control systems, etc.) and facilities at AF, USSF and ANG installations globally. Force Protection BPSS projects support long-term physical security requirements that allow installation commanders and security forces to adapt and counter enduring and emergent threats to high priority assets in accordance with home station, Aerospace Expeditionary Force concepts, and DOW Nuclear Weapons Security Standards where applicable. BPSS will procure tactical/expeditionary equipment that is required to provide robust force protection capabilities worldwide of flight-line security, aircraft, intelligence, surveillance, and reconnaissance assets, critical infrastructure, sustained sortie generation and air operations, integrated and interoperable C3 platform & components, and unit/personnel protective field equipment. The Defender Multi-Domain Command, Control and Communications (DMDC3) initiative will rapidly field a platform that integrates the computing power, the means of communication, and the tools for situational awareness to enable the protection of base personnel and base assets. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. PE 208047F - This Program Element Code (PEC) procures equipment and vehicles associated with the Air Force Antiterrorism program. PE 0205671F - Joint Counter RCIED (Remote Control Improvised Explosive Devices) Electronic Warfare (JCREW) is modernized system replacing legacy quick reaction capability CREW systems that cannot defeat advanced RCIED threats. I1B1 is the current fielded system that is a multi-mission capable system that defeats RCIED (explosive devices) and UAS (drones) threats. I1B1 systems are equipped for mounted and dismounted variants, providing force protection during AF forward basing, outside the wire security missions, and terminal attack control. LI 834130 - Air Force Physical Security System Air Force UNCLASSIFIED Page 2 of 34 P-1 Line #33 Volume 1 - 326 === page 363 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834130 / Air Force Physical Security System Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0207589F, 0604287F Line Item MDAP/MAIS Code: None Exhibits Schedule Exhibit Type Title* Subexhibits ID CD P-5a, P-21 MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 B-21 Raider A - / - 4 / 6.206 2 / 2.991 7 / 9.771 - / - 7 / 9.771 P-5 GBSD Squadrons A - / - 4 / 0.000 4 / 5.119 - / 2.518 - / - - / 2.518 P-5 Long Range Standoff (LRSO) A - / - - / 0.000 - / 0.947 - / 4.000 - / - - / 4.000 P-5 Joint Counter RCIED Electronic Warfare A - / - - / 0.000 - / 0.000 - / 5.000 - / - - / 5.000 P-5 Airbase Air Defense Systems (ABADS) A - / - 18 / 186.215 - / - P-5 Air Base Ground Defense A - / - - / 51.323 - / 68.609 P-3a 2 / IBDSS-4 (Capability Improvement) A - / - - / - - / 109.374 P-5 Base Physical Security Systems A - / - - / - P-5 Antiterrorism P-40 Total Gross/Weapon System Cost P-5a, P-21 P-5a, P-21 A - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD P-5a, P-21 MDAP/ MAIS Code / - - / 137.436 31 / 125.309 - / 2.021 - / 381.317 - 142 / 1,529.452 - / / 314.365 / 0.000 - / - / 143.537 - 42 / 74.317 - / - - / 2.103 - / - / 1,770.698 - / - - - / 0.000 42 / 74.317 / 2.016 - / 143.537 - 142 / 1,529.452 / 0.000 - / 2.103 / 1,770.698 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 B-21 Raider A - / - - / - - / - - / - - / - - / - P-5 GBSD Squadrons A - / - - / - - / - - / - - / - - / - P-5 Long Range Standoff (LRSO) A - / - - / - - / - - / - - / - - / - P-5 Joint Counter RCIED Electronic Warfare A - / - - / - - / - - / - - / - - / - P-5 Airbase Air Defense Systems (ABADS) A - / - - / - - / - - / - - / - - / - P-5 Air Base Ground Defense A - / - - / - - / - - / - - / - - P-3a 2 / IBDSS-4 (Capability Improvement) A / 0.000 - / - - / - - / - P-5 Base Physical Security Systems P-5 Antiterrorism P-40 Total Gross/Weapon System Cost P-5a, P-21 P-5a, P-21 - / 0.000 - - / / 109.374 A - / - - / - - / - - / - - / - - / - A - / - - / - - / - - / - - / - - / - / 354.364 - / - - / 1,330.083 - / 493.586 - / 348.663 - - / 5,130.512 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: PE 0101110F B-21 Raider Funding in FY 2027 will procure Electronic Security Systems. PE 0101122F AIR LAUNCHED CRUISE MISSILE (ALCM) Security Systems No FY 2026 funding requested. PE 0101213F MINUTEMAN SQUADRONS LI 834130 - Air Force Physical Security System Air Force UNCLASSIFIED Page 3 of 34 P-1 Line #33 Volume 1 - 327 === page 364 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834130 / Air Force Physical Security System Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0207589F, 0604287F Line Item MDAP/MAIS Code: None No FY 2026 funding requested. PE 0101233F - LGM-35A SENTINEL SQUADRONS Funding in FY27 will fund physical security system equipment in order for Sentinel facilities to be accredited for beneficial occupancy. PE 0101238F - LONG RANGE STANDOFF (LRSO) Funding in FY27 will fund physical security systems/associated equipment for LRSO facilities. This includes, but is not limited to: intrusion detection sensors, alarm annunciators, and surveillance systems required for nuclear weapon and Special Access Programs facilities. The physical security system is critical for the deployment of LRSO to meet nuclear certification and weapon system deployment timelines. PE 0207522F AIRBASE AIR DEFENSE SYSTEMS (ABADS) Counter Small Unmanned Aircraft System (C-sUAS) The primary system for C-sUAS capabilities will be the Small Unmanned Air Defense System (SUADS), supported by Medusa 3.0 command & control system [previously identified as the ACE pallet]. Funding will also be utilized to procure and field systems to additional locations and to further implementation of evolved Command, Control, Communication, Computers, and Intelligence [C4I] systems, thus improving the performance of the fielded Medusa Command and Control and System of Systems. Updates will include integration and installation of cyber fixes, OEM component upgrades, deficiency resolution, artificial intelligence for operator task automation, closed-loop training system for operator certification and proficiency, track fusion updates, Link 16 capability integration, Advanced Battle Management System [ABMS] interoperability, Universal Command & Control (UC2) implementation, Electronic Warfare upgrades and other C2 systems. Funding in FY 2027 will address continued proliferation of layered C-sUAS capability to priority DAF sites, procuring twelve (12) systems. Funding elements expected to support the Joint Interagency Task Force (JIATF) 401's consolidated Domestic Shield fielding initiative. PE 0207522F AIRBASE AIR DEFENSE SYSTEMS (ABADS) Missile Defense (MD) FY2027 funds will be used to procure the Commercial Off the Shelf (COTS)/Government Off the Shelf (GOTS) passive and active sensors, kinetic and non-kinetic effector technologies integrated with tailored Battle Management Command and Control (BMC2) subsystem to provide adaptive, resilient, and dedicated air defense capability. Funding is necessary to field defense capabilities for air bases and other critical infrastructure against air and missile threats. It contributes to the Point Defense mission set by providing organic Integrated Air and Missile Defense (IAMD) capability, combined with other local and distributed assets, to create a multi-layered defense-in-depth system that improves airbase defense and resiliency. The funds will be critical to fielding up to 47 kits in INDOPACOM, NORTHCOM, and EUCOM by FY28. Funding in FY2027 will continue procurement of ABADS MD combat capability in support of INDOPACOM and EUCOM. FY27 plans include procurement of BMC2 systems, organic Air Force-configured ALPS sensors, Integrated Battle Management Systems (IBCS) Systems, Sensor Transports, and Non-Kinetic Effectors (NKEs). Additionally, ABADS MD will begin procurement of Advanced Precision Kill Weapon System (APKWS), Active Radars, and a mix of short to medium range kinetic effector systems in FY 2027. PE 0207588F AIR BASE GROUND DEFENSE (ABGD) FY2027 funding to Air Force Materiel Command (AFMC)/Air Force Installation Mission and Support Center (AFIMSC) procures Air Force Tactical Security Equipment supporting procurement of tactical/ expeditionary equipment to provide robust force protection capabilities worldwide; flight-line security, advanced technology force multipliers to include: night vision and thermal imagery equipment, counter sniper/ battery capabilities, ground weapons, target acquisition radar, and inter operable tactical communications to satisfy Security Forces early warning requirements. Additionally, FY2027 funding continues to fund replenishment and stocking of necessary Log Det materiel to support Global Force Management/Air Force Force Generation (AFFORGEN)/Agile Combat Employment (ACE) constructs and provide off the shelf capability to respond to contingency operations both CONUS and OCONUS. Funding in FY 2027 to Air Force Installation Mission and Support Center (AFIMSC)/Log Det will replenish and refresh 1 legacy C2 system deployed to Air Forces Africa (AFAFRICA), Pacific Defense Initiative (PDI), and additional required War Readiness Material (WRM) in support of Global Force Management/Air Force Force Generation (AFFORGEN)/Agile Combat Employment (ACE) constructs. This will provide off the shelf capability to respond to contingency operations both CONUS and OCONUS. Overseas Operations Costs (OOC) funds this requirement in FY 2027. LI 834130 - Air Force Physical Security System Air Force UNCLASSIFIED Page 4 of 34 P-1 Line #33 Volume 1 - 328 === page 365 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834130 / Air Force Physical Security System Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0207589F, 0604287F Line Item MDAP/MAIS Code: None Funding in FY 2027 to USAFE will procure 12 interoperable command, control, security operations tactical radio/satellite communications equipment and battlespace/geospatial joint friendly forces tracking systems to support mounted (e.g., armored/unarmored tactical vehicles) and dismounted combat and defensive operations; ground and air tactical sensor/ radar systems; electronic countermeasure warfare systems; ground & air kinetic/non-kinetic weapons and support equipment in support of Global Force Management/AFFORGEN and ACE constructs. "Fiscal Year (FY) 2025 European Deterrence Initiative (EDI) funding accounted for in the Base budget total 30.794M and supports Air Base Ground Defense USAFE programs Funding in FY 2026 for Security Force Command and Control (C2) Equipment will be used to procure 1 Base Defense Operations Center (See LOGDET requirement), to include communications equipment, to support security forces deployed OCONUS. Air Base Ground Defense received a Congressional add for FY2026 32.000 million for "Program Increase, NASAMS" in support of AFRICOM UPL. Upon Congressional spend plan approval, an Internal Reprogramming (IR) will be processed aligning the funding to PE0207522F for proper execution. PE 0207589F BASE PHYSICAL SECURITY SYSTEMS [BPSS] Funding in FY 2027 for Integrated Base Defense Security System (IBDSS-4) will support force protection installs of Weapons Generation Facilities (WGFs), and non-nuclear (PL-1,2,3,4) assets (weapon systems, aircraft, command & control systems, etc.) and facilities (hangars, SCIFs, etc.) at AF, USSF and installations globally and Interim Contractor Support at AF and USSF bases. IBDSS systems will be cloud enabled and integrated to a common operating picture by integrating electronic security systems with Physical Security Information Managers (PSIM). Due to world-wide operational mission events, quantities are subject to change. IBDSS-4 will procure Tactical Security Systems (TSS) and other tactical/expeditionary equipment that is required to provide robust force protection capabilities worldwide. FY2027 procurement features fourteen (14) IBDSS-4 modernization installs, ten (10) Physical Security Information Managers (PSIM), and eighteen (18) TSS. PE 0208047 ANTITERRORRORISM [AT]. Funding in FY 2027 regarding BPAC 834130 Electronic Security Systems (ESS) will procure a Containerized Weapons System and 3 (three) Joint Light Tactical Vehicles for the AFAFRICA mission. PE 0205671 Joint Counter Remote Control Improvised Explosive Devices (RCIED) Electronic Warfare (JCREW). Funding in FY27 will fund Navy-led, joint Navy/AF program to replace legacy quick reaction capability CREW systems that cannot defeat advanced RCIED threats. I1B1 is the new fielded system that is a multimission capable system that defeats RCIED (explosive devices) and UAS (drones) threats. Efforts with funding starting in FY 2025 through FY 2028 are summarized on the P-40. The following cost deltas reflect funding for all 834130 Budget Program Activity Code (BPAC) PEs in the years FY26-29 except for PE 0207589F (Base Physical Security Systems). Base Physical Security Systems PE uses a P-3a through FY26 because it was categorized as a modification. All other 834130 PEs are not modifications and therefore use P-5s. Base Physical Security Systems PE is transitioning to a P-5 exhibit starting in Budget Year (2027) to support identification of end-item deliveries, to include the Tactical Security System (TSS). Efforts with funding starting in FY 2028 through FY 2031 are summarized on the P-40. Not all details of this funding are included in this P-40 exhibit set. A summary of the excepted details is as follows: (a) (b) (c) (d) (e) LI 834130 - Air Force Physical Security System Air Force FY 2028 Cost Delta: 1,330.083 million FY 2029 Cost Delta: 493.586 million FY 2030 Cost Delta: 348.663 million FY 2031 Cost Delta: 354.364 million FY Total Cost Delta: 4,748.150 million UNCLASSIFIED Page 5 of 34 P-1 Line #33 Volume 1 - 329 === page 366 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834130 / Air Force Physical Security System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: B-21 Raider MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) - 4 2 7 - 7 Gross/Weapon System Cost ($ in Millions) - 6.206 2.991 9.771 - 9.771 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 6.206 2.991 9.771 - 9.771 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 6.206 2.991 9.771 - 9.771 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.000 0.000 0.000 - 0.000 Gross/Weapon System Unit Cost ($ in Millions) - 1.552 1.496 1.396 - 1.396 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - B-21 Raider Cost Recurring Cost Electronic Security System (†) - - - 1.552 4 6.206 1.496 2 2.991 1.396 7 9.771 - - - 1.396 7 9.771 Subtotal: Recurring Cost - - - - - 6.206 - - 2.991 - - 9.771 - - - - - 9.771 Subtotal: Hardware - B-21 Raider Cost - - - - - 6.206 - - 2.991 - - 9.771 - - - - - 9.771 Gross/Weapon System Cost - - - 1.552 6.206 1.496 2.991 1.396 9.771 - - - 1.396 (†) 4 2 7 7 9.771 indicates the presence of a P-5a LI 834130 - Air Force Physical Security System Air Force UNCLASSIFIED Page 6 of 34 P-1 Line #33 Volume 1 - 330 === page 367 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 O O C Cost Elements (†) P-1 Line Item Number / Title: 834130 / Air Force Physical Security System FY Contractor and Location Method/Type or Funding Vehicle Item Number / Title [DODIC]: B-21 Raider Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Nov 2024 May 2025 4 1.552 Y Jan 2024 Qty (Each) RFP Issue Date Electronic Security System (†) 2025 Various / Ellsworth AFB Various AFGSC Electronic Security System (†) 2026 Various / Ellsworth AFB Various AFGSC Apr 2026 Jul 2026 2 1.496 Y Nov 2025 Electronic Security System (†) 2027 Various / Various Various AFGSC Feb 2027 May 2027 7 1.396 Y Dec 2026 indicates the presence of a P-21 LI 834130 - Air Force Physical Security System Air Force UNCLASSIFIED Page 7 of 34 P-1 Line #33 Volume 1 - 331 === page 368 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834130 / Air Force Physical Security System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: B-21 Raider Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Fiscal Year 2026 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Electronic Security System 1 2025 AF 4 0 4 1 2026 AF 2 0 2 2 2027 AF 7 0 7 A - - - - - - 4 0 A - - - 2 0 7 O C T N O V LI 834130 - Air Force Physical Security System Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 34 S E P O C T N O V D E C J A N F E B P-1 Line #33 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 332 === page 369 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834130 / Air Force Physical Security System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: B-21 Raider Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Electronic Security System 1 2025 AF 4 4 0 1 2026 AF 2 2 0 2 2027 AF 7 0 7 0 0 A O C T N O V LI 834130 - Air Force Physical Security System Air Force D E C J A N F E B M A R A P R 2 M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 34 S E P O C T 1 N O V D E C J A N 4 F E B P-1 Line #33 0 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 333 === page 370 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834130 / Air Force Physical Security System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: B-21 Raider Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 7 7 7 1 Various - Ellsworth AFB 2 Various - Various ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 0 0 0 0 0 0 0 0 1 5 3 8 0 0 0 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 834130 - Air Force Physical Security System Air Force UNCLASSIFIED Page 10 of 34 P-1 Line #33 Volume 1 - 334 === page 371 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834130 / Air Force Physical Security System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: GBSD Squadrons MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC - - - 2.518 - 2.518 - - - - 5.119 2.518 - 2.518 - - - - 5.119 2.518 - 2.518 Procurement Quantity (Units in Each) - 4 4 Gross/Weapon System Cost ($ in Millions) - 0.000 5.119 Less PY Advance Procurement ($ in Millions) - - Net Procurement (P-1) ($ in Millions) - 0.000 Plus CY Advance Procurement ($ in Millions) - - Total Obligation Authority ($ in Millions) - 0.000 FY 2027 Total (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - 0.000 1.280 - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - LGM-35A Sentinel Squadrons Cost Recurring Cost Facility Security Equipment - - - - - 0.000 1.280 5.119 - - 2.518 - - - - - 2.518 Subtotal: Recurring Cost - - - - - 0.000 - - 5.119 - - 2.518 - - - - - 2.518 Subtotal: Hardware - LGM-35A Sentinel Squadrons Cost - - - - - 0.000 - - 5.119 - - 2.518 - - - - - 2.518 Gross/Weapon System Cost - - - 0.000 0.000 1.280 5.119 - - 2.518 - - - - - 2.518 LI 834130 - Air Force Physical Security System Air Force 4 4 4 UNCLASSIFIED Page 11 of 34 P-1 Line #33 Volume 1 - 335 === page 372 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834130 / Air Force Physical Security System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Long Range Standoff (LRSO) MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 0.000 0.947 4.000 - 4.000 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.000 0.947 4.000 - 4.000 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.000 0.947 4.000 - 4.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Long Range Standoff (LRSO) Cost Recurring Cost Long Range Standoff (LRSO) - - - - - 0.000 - - 0.947 - - 4.000 - - - - - 4.000 Subtotal: Recurring Cost - - - - - 0.000 - - 0.947 - - 4.000 - - - - - 4.000 Subtotal: Hardware - Long Range Standoff (LRSO) Cost - - - - - 0.000 - - 0.947 - - 4.000 - - - - - 4.000 Gross/Weapon System Cost - - - - - 0.000 - - 0.947 - - 4.000 - - - - - 4.000 LI 834130 - Air Force Physical Security System Air Force UNCLASSIFIED Page 12 of 34 P-1 Line #33 Volume 1 - 336 === page 373 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834130 / Air Force Physical Security System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Joint Counter RCIED Electronic Warfare MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 0.000 0.000 5.000 - 5.000 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.000 0.000 5.000 - 5.000 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.000 0.000 5.000 - 5.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Joint Counter RCIED Electronic Warfare Cost Recurring Cost - - - - - 0.000 - - 0.000 0.200 25 5.000 - - - 0.200 25 5.000 Subtotal: Recurring Cost I1B1 - - - - - 0.000 - - 0.000 - - 5.000 - - - - - 5.000 Subtotal: Hardware - Joint Counter RCIED Electronic Warfare Cost - - - - - 0.000 - - 0.000 - - 5.000 - - - - - 5.000 Gross/Weapon System Cost - - - - - 0.000 - - 0.000 - - 5.000 - - - - - 5.000 LI 834130 - Air Force Physical Security System Air Force UNCLASSIFIED Page 13 of 34 P-1 Line #33 Volume 1 - 337 === page 374 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834130 / Air Force Physical Security System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Airbase Air Defense Systems (ABADS) MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) - 18 31 142 - 142 Gross/Weapon System Cost ($ in Millions) - 186.215 125.309 1,529.452 - 1,529.452 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) - Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) - - - 186.215 - 125.309 - - 186.215 - 1,529.452 - 125.309 - - 1,529.452 - 1,529.452 - - 1,529.452 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - 10.345 4.042 10.771 - 10.771 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - AIRBASE AIR DEFENSE SYSTEMS (ABADS) C-sUAS Cost Non Recurring Cost (†) ABADS C-sUAS - - - 2.001 Support to AFRICOM UPL - - - - - Domestic Shield - - - - - Subtotal: Non Recurring Cost - - - - - 120.005 - - - - - Subtotal: Hardware AIRBASE AIR DEFENSE SYSTEMS (ABADS) CsUAS Cost 4 8.005 5.177 10 51.766 2.421 12 29.056 - - - 2.421 12 29.056 112.000 - - - - - - - - - - - - - - - - - 57.000 - - - - - 57.000 - - 51.766 - - 86.056 - - - - - 86.056 120.005 - - 51.766 - - 86.056 - - - - - 86.056 28.665 8.200 24.600 8.900 3 26.700 - - - 8.900 3 26.700 - 8.900 12 106.800 - - - 8.900 12 106.800 17.000 3.500 18 63.000 - - - 3.500 18 63.000 - Hardware - AIRBASE AIR DEFENSE SYSTEMS (ABADS) MD Cost Non Recurring Cost ABADS MD - Battle Management Command & Control (BMC2) - - - 7.166 4 - - - - - - - - - - 3.300 10 33.000 3.400 3 (†) ABADS MD - Battle Management Command & Control (BMC2) Homeland ABADS MD (†) Sensors - (†) LI 834130 - Air Force Physical Security System Air Force 5 UNCLASSIFIED Page 14 of 34 P-1 Line #33 Volume 1 - 338 === page 375 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834130 / Air Force Physical Security System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Airbase Air Defense Systems (ABADS) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements ABADS MD - Sensors Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) - - - - - - - - - 3.500 54 189.000 - - - 3.500 54 189.000 ABADS MD - NonKinetic Effector Baseline - - - - - - - - - - - 95.900 - - - - - 95.900 ABADS MD - NonKinetic Effector 2 - - - - - - - - - - - 60.000 - - - - - 60.000 ABADS MD - Kinetic Effectors - - - - - - - - - - - 720.800 - - - - - 720.800 - - - - - - 0.800 10 8.000 0.856 26 22.256 - - - 0.856 26 22.256 (†) - - - - - - 2.870 3 8.610 3.000 8 24.000 - - - 3.000 8 24.000 ABADS MD - X-bar Radar - - - - - - - - - 10.500 9 94.500 - - - 10.500 9 94.500 Subtotal: Non Recurring Cost - - - - - 61.665 - - 58.210 - - 1,402.956 - - - - - 1,402.956 - - - - - 61.665 - - 58.210 - - 1,402.956 - - - - - 1,402.956 (†) Homeland ABADS MD - Data (†) Transport ABADS MD - IBCS Hardware Subtotal: Hardware AIRBASE AIR DEFENSE SYSTEMS (ABADS) MD Cost Support - AIRBASE AIR DEFENSE SYSTEMS (ABADS) C-sUAS Cost Program Support Costs (PSC) Other Government Costs Subtotal: Support AIRBASE AIR DEFENSE SYSTEMS (ABADS) CsUAS Cost - - - - - 1.545 - - 3.125 - - 3.200 - - - - - 3.200 - - - - - 1.545 - - 3.125 - - 3.200 - - - - - 3.200 Support - AIRBASE AIR DEFENSE SYSTEMS (ABADS) MD Cost Program Support Costs - - - - - 3.000 - - 5.000 - - 10.000 - - - - - 10.000 Integrated Battle Command System (IBCS) Interim Contractor Support - - - - - - - - 7.208 - - 27.240 - - - - - 27.240 Subtotal: Support AIRBASE AIR DEFENSE SYSTEMS (ABADS) MD Cost - - - - - 3.000 - - 12.208 - - 37.240 - - - - - 37.240 Gross/Weapon System Cost - - - 10.345 18 186.215 4.042 31 125.309 10.771 142 1,529.452 - - - 10.771 142 1,529.452 LI 834130 - Air Force Physical Security System Air Force UNCLASSIFIED Page 15 of 34 P-1 Line #33 Volume 1 - 339 === page 376 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 P-1 Line Item Number / Title: 834130 / Air Force Physical Security System ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Airbase Air Defense Systems (ABADS) MDAP/MAIS Code: Remarks: ABADS C-sUAS FY25 quantities of one (1) system refresh at OCONUS location and three (3) Electronic Warfare systems. ABADS C-sUAS FY25 includes funding supporting U.S. Africa Command (USAFRICOM) UPL (112M) pending execution pathway. ABADS C-sUAS FY26 quantities of two (2) system refreshes and eight (8) Rapidly-Deployable Small Unmanned Air Defense Systems (SUADS) to support expeditionary operations. ABADS C-sUAS FY27 quantities of twelve (12) systems. Funding elements expected to support the Joint Interagency Task Force (JIATF) 401's consolidated Domestic Shield fielding initiative. ABADS MD Production Quantities: An ABADS MD kit contains Battle Management Command and Control (BMC2) sub-system, Integrated Battle Command System (IBCS), multiple sensors and Non-Kinetic Effectors (NKE). The IBCS contains the IBCS hardware, IBCS relay, and sensor transport. Updating quantity format from Prior Year Exhibit to reflect total subsystem procurement and provide fidelity and continuity on a year-by-year basis. ABADS MD FY27 production of sub-systems, to include ABADS BMC2 sub-systems, ALPS sensors, NKEs, IBCS systems, Advanced Precision Kill Weapon System (APKWS), Active Radars, a mix of short to medium range kinetic effectors, gun weapons systems, to support DAF requirements in INDOPACOM and EUCOM. (†) indicates the presence of a P-5a LI 834130 - Air Force Physical Security System Air Force UNCLASSIFIED Page 16 of 34 P-1 Line #33 Volume 1 - 340 === page 377 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 O O C Item Number / Title [DODIC]: Airbase Air Defense Systems (ABADS) FY Contractor and Location Method/Type or Funding Vehicle (†) 2025 Multiple / Multiple Various Hanscom AFB (†) 2026 Multiple / Multiple Various Hanscom AFB Apr 2026 Oct 2026 10 5.177 Y (†) 2027 Multiple / Multiple Various Hanscom AFB Jan 2027 Oct 2027 12 2.421 Y 2025 Multiple / Multiple Various Hanscom AFB May 2025 Jul 2026 4 7.166 Y 2026 Multiple / Multiple Various Hanscom AFB Nov 2025 Jan 2027 3 8.200 Y 2027 Multiple / Multiple Various Hanscom AFB Nov 2026 Jan 2028 3 8.900 Y ABADS MD - Battle Management Command & Control (BMC2) Homeland 2027 Multiple / Multiple Various Hanscom AFB Nov 2026 Jan 2028 12 8.900 Y ABADS MD - Sensors Cost Elements ABADS C-sUAS ABADS C-sUAS ABADS C-sUAS ABADS MD - Battle Management (†) Command & Control (BMC2) ABADS MD - Battle Management (†) Command & Control (BMC2) ABADS MD - Battle Management (†) Command & Control (BMC2) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) May 2025 Sep 2025 4 2.001 Y Qty (Each) 2025 Leidos / Huntsville, AL Various Redstone Arsenal, AL May 2025 Nov 2026 10 3.300 Y (†) 2026 Leidos / Huntsville, AL Various Redstone Arsenal, AL Dec 2025 Jun 2027 5 3.400 Y (†) ABADS MD - Sensors 2027 Leidos / Huntsville, AL Various Redstone Arsenal, AL Dec 2026 Jun 2028 18 3.500 Y ABADS MD - Sensors Homeland 2027 Leidos / Huntsville, AL Various Redstone Arsenal, AL Dec 2026 Jun 2028 54 3.500 Y ABADS MD - Data Transport 2026 Various / Various Various Redstone Arsenal, AL Dec 2025 Jun 2028 10 0.800 Y ABADS MD - Data Transport 2027 Various / Various Various Redstone Arsenal, AL Dec 2026 Jan 2029 26 0.856 Y ABADS MD - IBCS Hardware 2026 Northrop Grumman / Huntsville, AL Various Redstone Arsenal, AL Aug 2026 Aug 2027 3 2.870 Y ABADS MD - IBCS Hardware 2027 Northrop Grumman / Huntsville, AL Various Redstone Arsenal, AL Aug 2027 Aug 2028 8 3.000 Y ABADS MD - Sensors (†) P-1 Line Item Number / Title: 834130 / Air Force Physical Security System RFP Issue Date indicates the presence of a P-21 LI 834130 - Air Force Physical Security System Air Force UNCLASSIFIED Page 17 of 34 P-1 Line #33 Volume 1 - 341 === page 378 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834130 / Air Force Physical Security System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Airbase Air Defense Systems (ABADS) Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P ABADS C-sUAS 1 2025 AF 4 0 4 1 2026 AF 10 0 10 1 2027 AF 12 0 12 A - - - - 1 - - - - - - - - A - - 3 0 - - - - 10 12 ABADS MD - Battle Management Command & Control (BMC2) 2 2025 AF 4 0 4 2 2026 AF 3 0 3 2 2027 AF 3 0 3 A - - - - - - - - - - - - - - A - - - - - - - - 1 3 - 0 - - 3 3 ABADS MD - Sensors 3 2026 AF 5 0 5 3 2027 AF 18 0 18 A - - - - - - - - - - 5 18 O C T N O V LI 834130 - Air Force Physical Security System Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 18 of 34 S E P O C T N O V D E C J A N F E B P-1 Line #33 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 342 === page 379 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834130 / Air Force Physical Security System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Airbase Air Defense Systems (ABADS) Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E ABADS C-sUAS 1 2025 AF 4 4 0 1 2026 AF 10 0 10 1 2027 AF 12 0 12 0 2 1 2 2 2 A - 1 - 0 - - - - - - - 1 1 2 2 2 2 2 0 ABADS MD - Battle Management Command & Control (BMC2) 2 2025 AF 4 4 0 2 2026 AF 3 0 3 2 2027 AF 3 0 3 0 - - - 1 2 A - - - - - - - 0 - - - - - - A - - - - - - - - - - - - - - - - - - - 2 1 ABADS MD - Sensors 3 2026 AF 5 0 5 3 2027 AF 18 0 18 O C T N O V LI 834130 - Air Force Physical Security System Air Force D E C J A N F E B M A R A P R M A Y 5 0 J U N J U L A U G UNCLASSIFIED Page 19 of 34 S E P O C T N O V D E C J A N F E B P-1 Line #33 M A R A P R M A Y 5 J U N 5 J U L 2 A U G 6 S E P Volume 1 - 343 === page 380 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834130 / Air Force Physical Security System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: Airbase Air Defense Systems (ABADS) Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Multiple - Multiple 1 15 60 1 4 9 13 0 0 0 0 2 Multiple - Multiple 2 4 20 2 2 14 16 0 0 0 0 3 Leidos - Huntsville, AL 2 4 100 2 3 18 21 0 0 0 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 834130 - Air Force Physical Security System Air Force UNCLASSIFIED Page 20 of 34 P-1 Line #33 Volume 1 - 344 === page 381 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834130 / Air Force Physical Security System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Air Base Ground Defense MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 Procurement Quantity (Units in Each) - - - Gross/Weapon System Cost ($ in Millions) - 51.323 68.609 Less PY Advance Procurement ($ in Millions) - - - Net Procurement (P-1) ($ in Millions) - 51.323 68.609 Plus CY Advance Procurement ($ in Millions) - - - Total Obligation Authority ($ in Millions) - 51.323 68.609 FY 2027 Base FY 2027 OOC - - 143.537 FY 2027 Total - - - 143.537 - 143.537 - - - 143.537 - 143.537 - - 143.537 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - ABGD Cost Recurring Cost Air Force Tactical Security Equipment - - - 4.632 1 4.632 2.639 2.639 12.229 12.229 - - - 12.229 EDI - - - 2.566 12 30.794 - - - - - - - - - - - - Log Det - - - 4.919 1 4.919 - - - - - - - - - - - - C-sUAS Equipment - - - 10.200 1 10.200 - - - - - - - - - - - - USAFE - - - - - - 2.831 12 33.970 3.221 16 51.538 - - - 3.221 16 51.538 CSTR Equipment - - - - - - - - - 13.295 6 79.770 - - - 13.295 6 79.770 Support to AFRICOM UPL - - - - - - - - 32.000 - - - - - - - - Subtotal: Recurring Cost - - - - - 50.545 - - 68.609 - - 143.537 - - - - - 143.537 Subtotal: Hardware - ABGD Cost - - - - - 50.545 - - 68.609 - - 143.537 - - - - - 143.537 Program Support Costs (Air Force Tactical Security Equipment) - - - 0.778 0.778 - - - - - - - - - - - - Subtotal: Support - ABGD Cost - - - - - 0.778 - - - - - - - - - - - - Gross/Weapon System Cost - - - - - 51.323 - - 68.609 - - - - - - - 1 1 1 12.229 - Support - ABGD Cost 1 143.537 143.537 Remarks: LI 834130 - Air Force Physical Security System Air Force UNCLASSIFIED Page 21 of 34 P-1 Line #33 Volume 1 - 345 === page 382 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 P-1 Line Item Number / Title: 834130 / Air Force Physical Security System ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Air Base Ground Defense MDAP/MAIS Code: Air Base Ground Defense: These funds will be used to procure tactical/expeditionary equipment that is required to provide robust force protection capabilities worldwide; flight-line security, aircraft, intelligence, surveillance, and reconnaissance assets, critical infrastructure, sustained sortie generation and air operations, advanced technology force multipliers to include: night vision and thermal imagery equipment, counter sniper/battery capabilities, ground weapons, target acquisition radar, inter operable tactical communications, [required command, control, & communication (C3) and protective standoff equipment for] wheeled tactical [non-tactical], armored [un-armored] vehicles, tactical sensors systems, and unit/personnel protective field equipment. Additionally, ABGD will procure all required Technology Integration Management (TIM) and associated integration and interoperability efforts. Air Base Ground Defense received a Congressional add for FY2026 32.000 million for "Program Increase, NASAMS" in support of AFRICOM UPL. Upon Congressional spend plan approval, an Internal Reprogramming (IR) will be processed aligning the funding to PE0207522F for proper execution. LI 834130 - Air Force Physical Security System Air Force UNCLASSIFIED Page 22 of 34 P-1 Line #33 Volume 1 - 346 === page 383 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 P-1 Line Item Number / Title: 834130 / Air Force Physical Security System ID Code (A=Service Ready, B=Not Service Ready) : A Resource Summary Modification Number / Title: 2 / IBDSS-4 MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 0.000 0.000 0.000 0.000 0.000 - - - Procurement Quantity (Units in Each) - - Gross/Weapon System Cost ($ in Millions) - - Less PY Advance Procurement ($ in Millions) - - Net Procurement (P-1) ($ in Millions) - - Plus CY Advance Procurement ($ in Millions) - - Total Obligation Authority ($ in Millions) - - 109.374 109.374 109.374 To FY 2031 Complete - - - - - - - - 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - - - 0.000 0.000 0.000 0.000 0.000 - - - Total 109.374 109.374 109.374 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: INTEGRATED BASE DEFENSE SECURITY SYSTEM (IBDSS-4): Reduces the risk to AF and USSF personnel; nuclear (PL-1N), and non-nuclear (PL 1-4) assets (weapon systems, aircraft, command & control systems, etc.) and facilities (hangars, SCIFs, etc.) at AF, USSF and ANG installations globally. DoW downsizing, reductions in forward basing, and aircraft technology advances evolved AF weapons systems into increasingly valuable national power projection capabilities. However, the security afforded most AF aircraft, weapon systems, other critical resources, and associated personnel and facilities in terms of equipment or manpower has not kept pace with the changing world environment, state-of-the-art technology and potential threats. The emergence of Remotely Piloted Aircraft (RPA) and Unmanned Aerial Vehicles (UAV) has led to additional command, control and communications nodes that require commensurate protection level security efforts to enable effective Air Force power projection. Force Protection IBDSS projects deliver capacity and resiliency to a commander's operational capabilities by deterring, detecting, assessing, responding and controlling assets to neutralize and deny risks from adversaries. In garrison the protection of flightlines, base assets (the force and mission equipment) and weapons storage (nuclear and conventional) as well as nodes for air operations and nuclear command and control is essential in delivery of global strike and air superiority. Palletized and fly away capabilities increase resiliency as operations and command and control extend to contingency and austere locations that have a role in power projection and rapid mobility. This same deter, detect, deny capability is established to protect ground nodes for early warning and intel collection. This continuing effort was previously named Base Physical Security Systems and is not a New Start. INTEGRATED BASE DEFENSE SECURITY SYSTEM (IBDSS-4): Funding in FY 2026 will provide for procurement, design & engineering, modeling & simulation, infrastructure and allied support, installation, integration, training, acceptance testing, Interim Contractor Support (ICS), and interim spares for IBDSS-4 Intrusion Detection Systems (IDS). The funding also procures, installs and sustains a variety of electronic security alarms, sensors, and related systems to detect and provide early warning of potential threats against Air Force Protection Level (PL) 1,2,3, and 4 mission critical assets. Funding also supports the Nuclear (PL-1N) Weapon Storage Areas (WSAs) and Weapons Generation Facilities (WGFs) located throughout the CONUS and vault storage areas at main operating bases in Europe to meet long term physical security requirements in the face of enduring and emerging threats. This also includes upgrading existing system to ensure required capability for vault storage areas and associated intrusion detection, access control and assessment systems requirements, In Accordance With (IAW) USAF, EUCOM and NATO/SHAPE requirements. The funds also provide for upgrades, refurbishment, replacement or installation of new fences (required for sensor platforms) and/or lighting systems (to support the surveillance/assessment functions). Due to world-wide operational mission events, quantities are subject to change. IBDSS-4 will procure Tactical Security Systems (TSS) and other tactical/expeditionary equipment that is required to provide robust force protection capabilities worldwide; flight-line security, aircraft, intelligence, surveillance, and reconnaissance assets, critical infrastructure, sustained sortie generation and air operations, advanced technology force multipliers to include: night vision and thermal imagery equipment, counter sniper/battery capabilities, ground weapons, target acquisition radar, inter operable tactical communications, [required C3 and protective standoff equipment for] wheeled tactical [non-tactical], armored [un-armored] vehicles, tactical sensors systems, and unit/personnel protective field equipment. Additionally, IBDSS-4 will procure all required Technology Integration Management (TIM) and associated integration and interoperability efforts. FY2026 procurement features 15 IBDSS-4 modernization installs, one WGF install, 19 TSS, and continued DMDC3 rollouts. Milestone/Development Status LI 834130 - Air Force Physical Security System Air Force UNCLASSIFIED Page 23 of 34 P-1 Line #33 Volume 1 - 347 === page 384 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 P-1 Line Item Number / Title: 834130 / Air Force Physical Security System ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: 2 / IBDSS-4 MDAP/MAIS Code: For Force Protection Commercial Off The Shelf (FP COTS) market research, evaluation and testing. The FP COTS testing applies to all available technologies (delay, denial, detection, assessment, communication display, access control and power) which are considered effective for AF physical security use. This program supports the maintenance and test support at Site C 3 and the Cold Weather Test Site (CWTS), as annotated in DoD Directive 3200.11, listing the 46th Test Wing (TW) as a Major Range and Test facility, conducting developmental and operational testing as the primary mission. Continuing COTS and Modified COTS for system equipment as it becomes obsolete. LI 834130 - Air Force Physical Security System Air Force UNCLASSIFIED Page 24 of 34 P-1 Line #33 Volume 1 - 348 === page 385 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 834130 / Air Force Physical Security System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A MDAP/MAIS Code: Models of Systems Affected: Bases Related RDT&E PEs: 0207589F, 0604287F Modification Type: Capability Improvement Prior Years Financial Plan Modification Number / Title: 2 / IBDSS-4 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 2: IBDSS-4 B Kits Recurring IBDSS-4:EQUIPMENT Group B (Active) - / - - / - 15 / 30.014 - / - - / - - / - - / - - / - - / - - / - - / - 15 / 30.014 - / - - / - - / 30.014 - / - - / - - / - - / - - / - - / - - / - - / - - / 30.014 - / - - / - - / 30.014 - / - - / - - / - - / - - / - - / - - / - - / - - / 30.014 - / - - / - 1 / 17.009 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 17.009 - / - - / - - / - - / - - / - - / - - / - - / - - / 17.009 - / - - / - - / 17.009 - / - - / - - / - - / - - / - - / - - / - - / - - / 17.009 - / - - / - - / 47.023 - / - - / - - / - - / - - / - - / - - / - - / - - / 47.023 Modification Item 1 of 2: IBDSS-4 - / - - / - 15 / 43.677 - / - - / - - / - - / - - / - - / - - / - - / - 15 / 43.677 Modification Item 2 of 2: Weapons Generation Facility (WGF) - / - - / - 1 / 18.674 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 18.674 Subtotal: Installation - / - - / - 16 / 62.351 - / - - / - - / - - / - - / - - / - - / - - / - 16 / 62.351 - 109.374 - 109.374 Subtotal: Recurring Subtotal: IBDSS-4 Modification Item 2 of 2: Weapons Generation Facility (WGF) B Kits Recurring Weapons Generation Facility (WGF):EQUIPMENT Group B (Active) Subtotal: Recurring Subtotal: Weapons Generation Facility (WGF) Subtotal: Procurement, All Modification Items 1 / 17.009 Installation Total Total Cost (Procurement + Support + Installation) LI 834130 - Air Force Physical Security System Air Force - 0.000 0.000 UNCLASSIFIED Page 25 of 34 0.000 0.000 0.000 P-1 Line #33 - - Volume 1 - 349 === page 386 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 834130 / Air Force Physical Security System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: 2 / IBDSS-4 MDAP/MAIS Code: Modification Item 1 of 2: IBDSS-4 Manufacturer Information Manufacturer Name: Multiple Manufacturer Location: Various Administrative Leadtime (in Months): 1 Dates Production Leadtime (in Months): 8 FY 2025 FY 2026 Contract Dates Jan 2026 Delivery Dates Sep 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Contract Field Team Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Installation Cost 15 / 43.677 15 / 43.677 15 / 43.677 15 / 43.677 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 0 - - - - 15 - - - - - - - - - - - - - - - - - - - - - - - 0 15 Out 0 - - - - 3 - - - - - - - - - - - - - - - - - - - - 0 15 4 4 LI 834130 - Air Force Physical Security System Air Force 4 UNCLASSIFIED Page 26 of 34 P-1 Line #33 Volume 1 - 350 === page 387 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 834130 / Air Force Physical Security System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: 2 / IBDSS-4 MDAP/MAIS Code: Modification Item 2 of 2: Weapons Generation Facility (WGF) Manufacturer Information Manufacturer Name: TBD Manufacturer Location: Various Administrative Leadtime (in Months): 1 Dates Production Leadtime (in Months): 5 FY 2025 FY 2026 Contract Dates Apr 2026 Delivery Dates Sep 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Contract Field Team Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - 1 / 18.674 - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - 1 / 18.674 - / - - / - - / - - / - - / - - / - - / - - / - Installation Cost 1 / 18.674 1 / 18.674 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 0 - - - - - - 1 - - - - - - - - - - - - - - - - - - - - - 0 1 Out 0 - - - - - - 1 - - - - - - - - - - - - - - - - - - - - - 0 1 LI 834130 - Air Force Physical Security System Air Force UNCLASSIFIED Page 27 of 34 P-1 Line #33 Volume 1 - 351 === page 388 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834130 / Air Force Physical Security System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Base Physical Security Systems MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) - - - 42 - 42 Gross/Weapon System Cost ($ in Millions) - - - 74.317 - 74.317 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - - 74.317 - 74.317 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - - 74.317 - 74.317 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - 1.769 - 1.769 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Base Physical Security Systems Cost Non Recurring Cost Modernization - - - - - - - - - 2.464 14 34.495 - - - 2.464 14 34.495 (†) - - - - - - - - - 0.839 18 15.102 - - - 0.839 18 15.102 PSIM - - - - - - - - - 0.497 10 4.970 - - - 0.497 10 4.970 Subtotal: Non Recurring Cost - - - - - - - - - - - 54.567 - - - - - 54.567 Subtotal: Hardware - Base Physical Security Systems Cost - - - - - - - - - - - 54.567 - - - - - 54.567 (†) Installs TSS Support - Base Physical Security Systems Cost Program Support Costs (PSC) Contractor Services - - - - - - - - - - - 16.850 - - - - - 16.850 Direct Mission Support (DMS) - - - - - - - - - - - 2.900 - - - - - 2.900 Subtotal: Support - Base Physical Security Systems Cost - - - - - - - - - - - 19.750 - - - - - 19.750 Gross/Weapon System Cost - - - - - - - - - 1.769 42 74.317 - - - 1.769 42 74.317 Remarks: FY26 funding for IBDSS-4 was reported on the P-3a and is being continued on this document. LI 834130 - Air Force Physical Security System Air Force UNCLASSIFIED Page 28 of 34 P-1 Line #33 Volume 1 - 352 === page 389 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 P-1 Line Item Number / Title: 834130 / Air Force Physical Security System ID Code (A=Service Ready, B=Not Service Ready) : A (†) Item Number / Title [DODIC]: Base Physical Security Systems MDAP/MAIS Code: indicates the presence of a P-5a LI 834130 - Air Force Physical Security System Air Force UNCLASSIFIED Page 29 of 34 P-1 Line #33 Volume 1 - 353 === page 390 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements Modernization Installs (†) (†) TSS (†) O O C P-1 Line Item Number / Title: 834130 / Air Force Physical Security System Item Number / Title [DODIC]: Base Physical Security Systems FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) 2027 Multiple / Multiple Various Hanscom AFB Feb 2027 Feb 2029 14 2.464 Y 2027 Clear Align LLC / Nashua NH TBD Hanscom AFB Jan 2027 Jul 2027 18 0.839 Y Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 834130 - Air Force Physical Security System Air Force UNCLASSIFIED Page 30 of 34 P-1 Line #33 Volume 1 - 354 === page 391 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834130 / Air Force Physical Security System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Base Physical Security Systems Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Modernization Installs 1 2027 AF 14 0 14 2027 AF 18 0 18 A - - - - - - - - - - - - - - - - - - - - 14 TSS 2 A O C T N O V LI 834130 - Air Force Physical Security System Air Force D E C J A N F E B M A R A P R M A Y J U N 2 J U L 2 A U G UNCLASSIFIED Page 31 of 34 2 S E P 2 O C T 2 N O V 2 D E C 2 J A N 2 F E B P-1 Line #33 2 M A R 0 A P R M A Y J U N J U L A U G S E P Volume 1 - 355 === page 392 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834130 / Air Force Physical Security System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Base Physical Security Systems Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Modernization Installs 1 2027 AF 14 0 14 2027 AF 18 18 0 - - - - 1 - - 2 2 2 2 2 1 - - 2 0 TSS 2 0 O C T N O V LI 834130 - Air Force Physical Security System Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 32 of 34 S E P O C T N O V D E C J A N F E B P-1 Line #33 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 356 === page 393 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834130 / Air Force Physical Security System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: Base Physical Security Systems Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Multiple - Multiple 4 12 14 1 5 24 29 0 0 0 0 2 Clear Align LLC - Nashua NH 1 1 24 0 0 0 0 1 4 6 10 Remarks: The Period of Performance for Modernization Installs is 24 months. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 834130 - Air Force Physical Security System Air Force UNCLASSIFIED Page 33 of 34 P-1 Line #33 Volume 1 - 357 === page 394 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834130 / Air Force Physical Security System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Antiterrorism MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 2.021 2.016 2.103 - 2.103 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 2.021 2.016 2.103 - 2.103 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 2.021 2.016 2.103 - 2.103 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Vehicles - Antiterrorism Cost Non Recurring Cost AFAFRICA Vehicles - - - 0.500 Subtotal: Non Recurring Cost - - - - - - - - AFAFRICA Support Equipment - - - 0.521 Subtotal: Non Recurring Cost - - - - Subtotal: Ancillary Equipment - Antiterrorism Cost - - - Gross/Weapon System Cost - - - Subtotal: Vehicles Antiterrorism Cost 3 1.500 0.672 - 1.500 - - 1.500 3 2.016 0.701 - 2.016 - - - 2.016 0.521 - - - 0.521 - - - 0.521 - - 2.021 3 2.103 - - - 0.701 3 2.103 - 2.103 - - - - - 2.103 - - 2.103 - - - - - 2.103 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2.016 - - 2.103 - - - - - 2.103 Ancillary Equipment - Antiterrorism Cost Non Recurring Cost 1 Remarks: FY2026 funding will be used to procure 3 Joint Light Tactical Vehicles (JLTV) in support of the AFAFRICA mission. LI 834130 - Air Force Physical Security System Air Force UNCLASSIFIED Page 34 of 34 P-1 Line #33 Volume 1 - 358 === page 395 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834180 / Samtec Communications Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - - 3.275 0.000 0.000 17.641 - 17.641 18.012 18.351 18.696 19.070 - 95.045 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Total - - - - - - - - - - - - 3.275 0.000 0.000 17.641 - 17.641 18.012 18.351 18.696 19.070 - 95.045 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) To FY 2031 Complete - - - - - - - - - - - - 3.275 0.000 0.000 17.641 - 17.641 18.012 18.351 18.696 19.070 - 95.045 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: PE 0303150F GLOBAL COMMAND AND CONTROL SYSTEM AIR FORCE (GCCS-AF): In FY 2027, PE 0303150F Global Command and Control System Air Force, WSC 834040 AF Global Command & Control System efforts were transferred to WSC 83410 Samtec Communications as part of the Budget Line-Item (BLI) Consolidation effort. The GCCS-AF program provides the common Air Force (AF) infrastructure hardware and software necessary to pass Air Force command and control (C2) data among commands, their components, and the Joint GCCS. This program procures GCCS components which include, but are not limited to, items such as servers, commercial-off-the-shelf (COTS) software, and associated peripherals to provide users with the full suite of joint baseline capability (including the common operating picture and Integrated Imagery & Intelligence). GCCS-AF is integrated at the following locations to establish full joint connectivity and operational capability across the spectrum of intelligence, operations, war planning, manpower, and logistics: AF-supported war-fighting commands, AF critical sites, Headquarters United States Air Force, Major Command headquarters (MAJCOM), Numbered Air Forces, Wings, Air National Guard (ANG) bases, Air Force Reserve (AFR) bases, and remote sites. Each site will comply with current Air Force and Department of War (DoW) network initiatives by employing a standardized interface among AF base-level classified C2 networks, AF base-level network control centers, and the joint Defense Information Systems Agency (DISA) Secret Internet Protocol Router Network (SIPRNET). This program provides a flexible open system and distributed C2 architecture necessary to support the joint GCCS. GCCS supports AF operations by installing and upgrading a site's classified C2 system through extensive use of COTS technology that adheres to AF command and control, communications, and computer architectures and standards. The 3.55 million increase in FY2027 allows for the procurement of additional server hardware to meet the tech refresh cycle requirements and ensure GCCS-AF sites are maintained on the GCCS-J baseline. Funding for the exhibit contained in PE 0303150F. PE 0401840F AMC Command and Control System LI 834180 - Samtec Communications Air Force UNCLASSIFIED Page 1 of 11 P-1 Line #34 Volume 1 - 359 === page 396 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834180 / Samtec Communications Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A In FY 2027, PE 0401840F AMC Command and Control, WSC 834070 Mobility Command and Control efforts were transferred to WSC 834180 Samtec Communications as part of the Budget Line-Item Consolidation effort. GLOBAL MOBILITY COMMAND AND CONTROL (C2) ARCHITECTURE AIR MOBILITY COMMAND (AMC): The AMC C2 architecture is an integrated, command-wide program that supports US Air Force airlift/air refueling missions around the globe with centralized control/decentralized execution. To execute America's Global Reach mission, Air Mobility Command's 618th Air Operations Center (AOC) plans, schedules, and directs a fleet of more than 1,100 mobility aircraft. The 618th AOC operates combat delivery, strategic airlift, air refueling, and aeromedical evacuation operations around the world. MOBILITY AIR FORCE (MAF) COMMAND AND CONTROL (C2) INFRASTRUCTURE: Provides base wired/wireless infrastructure equipment supporting AMC's 618th AOC and AMC's 11 bases to assure connectivity to AMC's command and control (C2) systems and to ensure they remain operational at AMC bases and operating locations. MAF C2 Infrastructure ensures connectivity with critical Air Force systems such as the Information Transport System (ITS), Global Combat Support System (GCSS), and the Global Decision Support System (GDSS). Funding for this exhibit contained in PE 0401840F. Funds in this Budget Line Item (BLI) were included in a BLI consolidation for the FY27 PB. The exhibit includes funding from BLIs, 834040 and 834070. This BLI consolidation improves transparency, execution, and long-term planning. LI 834180 - Samtec Communications Air Force UNCLASSIFIED Page 2 of 11 P-1 Line #34 Volume 1 - 360 === page 397 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834180 / Samtec Communications Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD P-5 Global Command and Control System P-5a, P-21 A P-5 AMC Command and Control System P-5a, P-21 A P-40 Total Gross/Weapon System Cost MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 3.275 - / 0.000 - / 0.000 - / 5.497 - / - - / 5.497 / - - / 0.000 - / 0.000 - / 12.144 - / - - / 12.144 / 3.275 - / 0.000 - / 0.000 - / 17.641 - / - - / 17.641 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: PE 0303150F Global Command and Control System Air Force GLOBAL COMMAND AND CONTROL SYSTEM AIR FORCE (GCCS-AF): Funding in FY2027 will procure additional hardware servers to support the continued multi-year replacement of hardware to meet the DISA-J software support requirements for the GCCS C2 system. PE 0401840F AMC Command and Control System MOBILITY AIR FORCE (MAF) COMMAND AND CONTROL (C2) INFRASTRUCTURE: FY 2027 funding continues procurement of wired and wireless base network infrastructure equipment, including cabling, routers, bridges, hubs, repeaters, and switches. These upgrades ensure that information technology remains current and maintains interoperability with AMC C2 systems, meeting the needs of the warfighter and AMC's worldwide mobility mission. These upgrades include modernization efforts to SIPRNet to allow for cross-domain capabilities and allowing access to sensitive compartmented information, procuring warfighter NIPRNet & SIPRNet mobile laptops and zero client workstations, and procuring fiber installs, premise wiring, equipment racks, and licensing. LI 834180 - Samtec Communications Air Force UNCLASSIFIED Page 3 of 11 P-1 Line #34 Volume 1 - 361 === page 398 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834180 / Samtec Communications Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Global Command and Control System MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 3.275 0.000 0.000 5.497 - 5.497 - - - - - - 3.275 0.000 0.000 5.497 - 5.497 - - - - - - 3.275 0.000 0.000 5.497 - 5.497 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Global Command and Control System Cost Recurring Cost GCCS-AF Server - - 0.693 - - 0.000 - - 0.000 0.029 119 3.451 - - - 0.029 119 3.451 Subtotal: Recurring Cost - - 0.693 - - 0.000 - - 0.000 - - 3.451 - - - - - 3.451 Subtotal: Hardware - Global Command and Control System Cost - - 0.693 - - 0.000 - - 0.000 - - 3.451 - - - - - 3.451 Replacement (†) Support - Global Command and Control System Cost PSC Contractor Services - - 2.384 - - - - - - - - 2.029 - - - - - 2.029 PSC Other Government Costs - - 0.198 - - - - - - - - 0.017 - - - - - 0.017 Subtotal: Support - Global Command and Control System Cost - - 2.582 - - - - - - - - 2.046 - - - - - 2.046 Gross/Weapon System Cost - - 3.275 - - 0.000 - - 0.000 - - 5.497 - - - - - 5.497 (†) indicates the presence of a P-5a LI 834180 - Samtec Communications Air Force UNCLASSIFIED Page 4 of 11 P-1 Line #34 Volume 1 - 362 === page 399 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 O O C Cost Elements GCCS-AF Server Replacement (†) (†) P-1 Line Item Number / Title: 834180 / Samtec Communications FY Contractor and Location Method/Type or Funding Vehicle 2027 TBD / TBD C / Various Item Number / Title [DODIC]: Global Command and Control System Location of PCO Award Date Date of First Delivery Hanscom AFB Jul 2027 Jan 2028 Qty (Each) 119 Specs Date Unit Cost Avail Revision Now? Available ($ M) 0.029 RFP Issue Date Y indicates the presence of a P-21 LI 834180 - Samtec Communications Air Force UNCLASSIFIED Page 5 of 11 P-1 Line #34 Volume 1 - 363 === page 400 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834180 / Samtec Communications Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Global Command and Control System Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P J U N J U L A U G S E P B A L A N C E GCCS-AF Server Replacement 1 2027 AF 119 0 119 LI 834180 - Samtec Communications Air Force A J U L A U G UNCLASSIFIED Page 6 of 11 S E P O C T N O V D E C 25 J A N 25 F E B P-1 Line #34 25 M A R 25 A P R 19 M A Y 0 Volume 1 - 364 === page 401 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834180 / Samtec Communications Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Item Number / Title [DODIC]: Global Command and Control System Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 200 1,000 1 TBD - TBD ALT Prior to Oct 1 ALT After Oct 1 1 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 834180 - Samtec Communications Air Force UNCLASSIFIED Page 7 of 11 P-1 Line #34 Volume 1 - 365 0 === page 402 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834180 / Samtec Communications Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: AMC Command and Control System MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 0.000 0.000 12.144 - 12.144 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.000 0.000 12.144 - 12.144 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.000 0.000 12.144 - 12.144 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - AMC Command and Control System Cost Recurring Cost Base Network Infrastructure (†) Equipment - - - - - 0.000 - - 0.000 12.144 1 12.144 - - - 12.144 1 12.144 Subtotal: Recurring Cost - - - - - 0.000 - - 0.000 - - 12.144 - - - - - 12.144 Subtotal: Hardware - AMC Command and Control System Cost - - - - - 0.000 - - 0.000 - - 12.144 - - - - - 12.144 Gross/Weapon System Cost - - - - - 0.000 - - 0.000 - - 12.144 - - - - - 12.144 Remarks: In FY 2027, PE 0401840F AMC Command and Control, WSC 834070 Mobility Command and Control efforts were transferred to WSC 834180 Samtec Communications as part of the Budget Line-Item Consolidation effort. (†) indicates the presence of a P-5a LI 834180 - Samtec Communications Air Force UNCLASSIFIED Page 8 of 11 P-1 Line #34 Volume 1 - 366 === page 403 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements Base Network Infrastructure (†) Equipment (†) O O C P-1 Line Item Number / Title: 834180 / Samtec Communications FY Contractor and Location Method/Type or Funding Vehicle 2027 GSA / Scott AFB SS / Various Item Number / Title [DODIC]: AMC Command and Control System Location of PCO Award Date Date of First Delivery AMC Oct 2026 Jan 2027 Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) 1 12.144 Y RFP Issue Date Nov 2025 indicates the presence of a P-21 LI 834180 - Samtec Communications Air Force UNCLASSIFIED Page 9 of 11 P-1 Line #34 Volume 1 - 367 === page 404 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834180 / Samtec Communications Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: AMC Command and Control System Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N Calendar Year 2028 F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Base Network Infrastructure Equipment 1 2027 AF 1 0 1 A O C T LI 834180 - Samtec Communications Air Force N O V D E C 1 J A N 0 UNCLASSIFIED Page 10 of 11 P-1 Line #34 Volume 1 - 368 === page 405 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834180 / Samtec Communications Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Item Number / Title [DODIC]: AMC Command and Control System Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 1 1 1 GSA - Scott AFB ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 1 Manufacturing PLT 1 Total After Oct 1 3 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 834180 - Samtec Communications Air Force UNCLASSIFIED Page 11 of 11 P-1 Line #34 Volume 1 - 369 4 === page 406 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 370 === page 407 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834190 / Combat Training Ranges Equip / BSA 4: Spcl Comm-Electronics Projects Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) - Gross/Weapon System Cost ($ in Millions) - Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) - Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) - FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 94.378 - 94.378 286.432 286.432 286.432 158.396 158.396 158.396 - - - 94.378 - 94.378 - - - 94.378 - 94.378 256.030 256.030 256.030 247.297 247.297 247.297 245.409 245.409 245.409 To FY 2031 Complete 249.856 249.856 249.856 Total - 1,537.798 - 1,537.798 - 1,537.798 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: PE 0207429F: COMBAT TRAINING RANGES (CTR) program procures electronic telecommunication and instrumentation equipment and threat systems for training ranges worldwide to satisfy air combat and electronic warfare (EW) test and training capability requirements. It also procures range scoring systems and replacement equipment for electronics no longer logistically supportable. Funds may be used to address production Diminishing Manufacturing Sources and Material Shortage (DMSMS)/Obsolescence issues through studies, bridge buys, life of type buys, supplier parts replacement and qualification activities to preserve future production capabilities and capacities. ADVANCED RADAR THREAT SYSTEM VARIANT 1 (ARTS-V1): The ARTS-V1 program is comprised of dual long-range strategic Surface to Air Missile (SAM) threat systems. ARTS-V1 is designed to be used at Department of War (DoW) training ranges for aircrew training and tactics development to increase combat effectiveness and aircrew survivability. While various aircraft platforms may train against ARTSV1, the focus of the program is to deliver realistic closed-loop threat replication meant to test 5th/6th generation aircraft capabilities against near-peer adversary capabilities. Funding will be used to support the installation, training, delivery, production, contractor support, sustainment buy-in, and retrofit of fielded articles. ADVANCED RADAR THREAT SYSTEM Variant 3 (ARTS- V3): ARTS-V3 is developing the most advanced ground-based radars in the US inventory using digital active electronically scanned radar technology that will be used to simulate the latest foreign peer adversary Surface-to-Air Missile (SAM) radar and Electronic Warfare (EW) threat systems. ARTS-V3 systems are a critical part of the Operational Training and Test Infrastructure (OTTI) plan for developing future Tactics, Techniques and Procedures (TTPs) for 5th/6th generation aircraft (F-35, B-21, F-47). ARTS-V3 systems are critical for the DoW's testing capabilities for validation of advanced airpower capabilities against threat-representative radar systems and validation of models used for the Joint Simulation Environment (JSE). ADVANCED RADAR THREAT SYSTEM TECH DEVELOPMENT: Procurement funds assigned to this element will be used to produce medium cost threat emitters/radars. Systems currently in consideration for production include the Combat Hazard Emitter for Engagement Training and Assessment (CHEETA), miniature radars from technology developed for ARTS V3, New Improved Near-peer Emitter Radar (NINER) and comparable technical alternatives. Funding will also be used to procure operational spares, engineering changes, and/or interim contract support. RADAR SIGNAL EMULATORS (RSE): The RSE program will procure advanced Surface-to-Air Missile (SAM) radar threat systems that can replicate multiple threats at the fidelity necessary for 5th generation and multi-domain training. LI 834190 - Combat Training Ranges Air Force UNCLASSIFIED Page 1 of 13 P-1 Line #35 Volume 1 - 371 === page 408 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834190 / Combat Training Ranges Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A P6 COMBAT TRAINING SYSTEMS (CTS): P6CTS will resolve existing critical training capability gaps and will enable comprehensive, realistic air combat training. Key upgrades include a trusted operating system, Multiple Independent Levels Security (MILS) architecture, Type 1 encryption of over-air data, and increased processing capability. P6CTS investment will support a robust Air-to-Air and Air-to-Ground combat training environment and provide a growth path to Blended Training capability. The P6CTS is comprised of airborne participant subsystem, ground system/subsystem and ancillary range communication infrastructure. The P5CTS is comprised of the P5 pod, communication links, and a ground station to support range safety, training execution, and aircrew debriefings. The system was in sustainment but with the P6CTS program's delayed acquisition the program has moved to the right with an estimated lifecycle through 2034. RANGE EQUIPMENT AIR COMBAT COMMAND (ACC): This effort delivers range infrastructure and equipment in order to monitor and control an extended, realistic target environment for simulated ordnance delivery and provide scoring, feedback and debriefing to the aircrew. This effort includes, but is not limited to, the Joint Advanced Weapon Scoring System (JAWSS) program, which consists of Navy-developed scoring and feedback systems that provide weapon impact and laser spot scoring on bombing and gunnery ranges, electronic warfare threat subsystems such as noise and spoofing jammers and ground based laser countermeasures and directed lasers as well as radar and detection systems, data link connectivity, target shells, simulations and concealments, integrated air combat training instrumentation for range-less and tethered ground systems, and Range Safety Systems (RSS). In addition, this effort includes replacing obsolete range and communication infrastructure equipment, including fiber optic cabling, microwave, radios and antennas, data links and repeater stations, power subsystems, and control systems. RANGE EQUIPMENT PACIFIC DETERRENCE INITIATIVE (PDI): The USAF is supporting US Indo-Pacific Command's Pacific Multi-domain Training and Experimentation Capability (PMTEC) initiative which includes enhancement of infrastructure and facilities in the vicinity of Guam and along the Second Island Chain (SIC) to build a live air-to-air training range that will support joint interoperability for maritime strike, war-at- sea, and high-end training. This initiative is designed to generate joint readiness, test emerging capabilities, and drive theater-appropriate requirements in a fully instrumented live, virtual, constructive training area. Funding for this effort in FY 2027 is shown under Range Equipment. LIVE MISSION OPERATIONS CAPABILITY (LMOC): LMOC is a government-owned command system serving as the training range equivalent of an Air Operations Center (AOC). Connecting all CAF ranges through a secure, dedicated network backbone, LMOC utilizes a long-term, modular, and scalable architecture to enable real-time mission planning, execution, and debriefing. This multi-domain, multi-security level environment facilitates the integration of 4th/5th/6th generation live-synthetic training by supporting blue/red/white force cells from pre-event preparations through live monitoring to post-event debriefing and data storage. LMOC features provisions for future Live, Virtual, and Constructive (LVC)/Blended and Joint interoperability test and training requirements enhancing warfighter capabilities. Funding for this exhibit contained in PE 0207429F Combat Training Ranges and PE 0207604 Readiness Training Ranges Operations and Maintenance. In FY 2025 3080 funding in PE 0207604F supporting Combat Training Ranges was transferred to PE 0207429F. LI 834190 - Combat Training Ranges Air Force UNCLASSIFIED Page 2 of 13 P-1 Line #35 Volume 1 - 372 === page 409 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834190 / Combat Training Ranges Equip / BSA 4: Spcl Comm-Electronics Projects Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Advanced Radar Threat System V1 P-5 P6 Combat Training System P-5 P-5 Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) B - / - - / 10.343 - / 6.350 - / 6.084 - / - - / 6.084 B - / - - / 14.849 - / 13.537 - / 13.851 - / - - / 13.851 Range Equipment A - / - - / 37.332 - / 115.133 - / 38.561 - / - - / 38.561 Radar Signal Emulator A - / - - / 4.379 / 4.549 - / 4.744 - / - - P-5 Combat Training Range Equipment A - / - - / 191.391 / - - / - P-5 Live Mission Operations Capability A - / - - / 28.138 - / 18.827 - / 31.138 - / - - / 31.138 P-40 Total Gross/Weapon System Cost - / - - / 286.432 - / 158.396 - / 94.378 - / - - / 94.378 P-5a P-5a - / - - / 4.744 - / - *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: ARTS-V1: FY2027 will fund system enhancements to the Production baseline to keep the system current with the latest intelligence assessments of the threats replicated by ARTS V1 as well as fund another year of Interim Contractor Support for the Production Representative Article fielded at the Nevada Test and Training Range. ARTS-V3: FY2027 will fund production of Digital Transmit and Receive Line Replicable Units (DTRL) end items that compose the building blocks of any configuration of an ARTS V3 radar ARTS Technical Development: 2027 funds will procure low and medium cost threat emitters for Test and Training purposes. LMOC: FY27 funding supports, but is not limited to, equipment required to field 2 LMOC expansions, 8 LMOC installs, a transportable LMOC system, an integration LMOC stack, and new security enclaves for 45 operational sites. It also supports integration efforts, travel, and install costs for the equipment. P6 Combat Training System (CTS): FY2027 funding supports, but is not limited to, the procurement of P6CTS ground systems/subsystems, spares and Remote Range Unit (RRU)s. Funds may also be used for site surveys, installations, training and Interim Contractor Support (ICS) to include Field Tech Representative (FTR) support. Range Equipment Air Combat Command (ACC): FY 2027 CAF funding supports continued procurement of Nellis Test and Training Range's (NTTR) network, cross domain, RF communications, and Range Interoperability Transport Architecture (RITA) infrastructure and the CAF's Live Mission Operations Network (LMON) & Digital Range Management System (DRMS), and supports the Utah Test and Training Range's (UTTR) telemetry system upgrade, and Joint Pacific Alaska Range's (JPARC) Passive Detection Radar, along with various other CAF Ranges' communication, power, facility, and target upgrades. Range Equipment Pacific Deterrence Initiative (PDI): FY 2027 Funding supports continued procurement of advanced threat emitters, fiber infrastructure, 5G SATCOM, and radio equipment for INDOPACOM's buildup of training range capabilities around Guam and the second island chain. FY 2027 PDI funding accounted for in the Base budget supports 4 Combat Training Range Equipment Programs. Decrease from FY 2026 to FY 2027 reflects contracted support for underwater survey and cable laying island-to-island anticipated to be complete in FY 2026. Radar Signal Emulator (RSE): FY 2027 funding is for RSE support for procured systems. LI 834190 - Combat Training Ranges Air Force UNCLASSIFIED Page 3 of 13 P-1 Line #35 Volume 1 - 373 === page 410 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834190 / Combat Training Ranges Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: Advanced Radar Threat System V1 MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 10.343 6.350 6.084 - 6.084 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 10.343 6.350 6.084 - 6.084 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 10.343 6.350 6.084 - 6.084 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Support - Advanced Radar Threat System V1 Cost Program Support Cost Other Government Costs - - - - - 1.910 - - 4.150 - - 4.000 - - - - - 4.000 Program Support Cost Contractor Services - - - - - 5.833 - - 1.200 - - 1.084 - - - - - 1.084 Interim Contract Support - - - - - 2.600 - - 1.000 - - 1.000 - - - - - 1.000 Subtotal: Support Advanced Radar Threat System V1 Cost - - - - - 10.343 - - 6.350 - - 6.084 - - - - - 6.084 Gross/Weapon System Cost - - - - - 10.343 - - 6.350 - - 6.084 - - - - - 6.084 Remarks: ARTS-V1 Program Support Costs. Program Support Costs are defined as direct, unique program costs (other than payroll costs for government personnel) required for the operation of a program office in its management and oversight role. The financing of program support costs must be consistent with: a) the type of work being performed; b) where the program resides within the acquisition phase (lifecycle); and c) existing regulatory and statutory doctrine, including coverage governing the purpose of an appropriation. (T-1). Program Support Cost Contractor Services will fund system enhancements to the Production baseline to keep the system current with the latest intelligence assessments of the threats replicated by ARTS-V1 as well as fund another year of Interim Contractor Support for the Production Representative Article fielded at the Neveda Test and Training Range. ARTS-V1 MAJCOM FM, FOA or DRU Offices will budget program support costs on an annual basis and reflect in the FY the requirement is projected to execute; requirements will be budgeted and executed in the weapon system or PEC within the procurement, RDT&E, or O&M appropriations. (T-1). For multi-year appropriations, execution of program support costs may occur in any year of funds currently available. LI 834190 - Combat Training Ranges Air Force UNCLASSIFIED Page 4 of 13 P-1 Line #35 Volume 1 - 374 === page 411 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834190 / Combat Training Ranges Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: P6 Combat Training System MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 14.849 13.537 13.851 - 13.851 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 14.849 13.537 13.851 - 13.851 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 14.849 13.537 13.851 - 13.851 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - P6CTS Ground Hardware Cost Recurring Cost Ground Hardware See Remarks (†) - - - - - 2.283 0.525 20 1 10.497 0.510 15 7.650 - - - 0.510 15 7.650 Spares - See Remarks - - - - - 7.399 0.540 0.540 - - - - - - - - - Subtotal: Recurring Cost - - - - - 9.682 - - 11.037 - - 7.650 - - - - - 7.650 Subtotal: Hardware - P6CTS Ground Hardware Cost - - - - - 9.682 - - 11.037 - - 7.650 - - - - - 7.650 Hardware - P5 Combat Training System Cost Non Recurring Cost Ground Equipment - - - - - 5.167 - - - - - - - - - - - - Subtotal: Non Recurring Cost - - - - - 5.167 - - - - - - - - - - - - - - - - - 5.167 - - - - - - - - - - - - Program Support Costs Other Government Costs - - - - - - - - 0.000 - - - - - - - - - Program Support Costs Contractor Services - - - - - - - - 2.500 - - 6.201 - - - - - 6.201 Subtotal: Support - P6CTS Support Costs Cost - - - - - - - - 2.500 - - 6.201 - - - - - 6.201 Gross/Weapon System Cost - - - - - 14.849 - - 13.537 - - 13.851 - - - - - 13.851 Subtotal: Hardware - P5 Combat Training System Cost Support - P6CTS Support Costs Cost LI 834190 - Combat Training Ranges Air Force UNCLASSIFIED Page 5 of 13 P-1 Line #35 Volume 1 - 375 === page 412 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 P-1 Line Item Number / Title: 834190 / Combat Training Ranges ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: P6 Combat Training System MDAP/MAIS Code: Remarks: P6 CTS Ground Hardware: Ground Hardware consisting of Common Ground Subsystems (CGSs) the Portable Support Equipment Subsystems (PSESs) and the Remote Range Units (RRUs) will vary from site to site based upon Range complexity. P6 CTS Spares: Spares consist of replacement parts, components and/or major subassemblies that make up the Common Ground Subsystem (CGS) the Portable Support Equipment Subsystem (PSES) and the Remote Range Unit (RRU). P6 CTS Contractor Services: Funds may also be used for site surveys, installations, training and Interim Contractor Support (ICS). P6 CTS Program Support Costs. Program Support Costs are defined as direct, unique program costs (other than payroll costs for government personnel) required for the operation of a program office in its management and oversight role. The financing of program support costs must be consistent with a) the type of work being performed; b) where the program resides within the acquisition phase (lifecycle); and c) existing regulatory and statutory doctrine, including coverage governing the purpose of an appropriation. (T-1). P6 CTS MAJCOM FM, FOA or DRU Offices will budget program support costs on an annual basis and reflect in the FY the requirement is projected to execute; requirements will be budgeted and executed in the weapon system or PEC within the procurement, RDT&E, or O&M appropriations. (T-1). For multi-year appropriations, execution of program support costs may occur in any year of funds currently available. Increase in funding from FY 2026 to FY 2027 procures additional P6 CTS Ground Hardware in support of planned fielding schedule. (†) indicates the presence of a P-5a LI 834190 - Combat Training Ranges Air Force UNCLASSIFIED Page 6 of 13 P-1 Line #35 Volume 1 - 376 === page 413 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Item Number / Title [DODIC]: P6 Combat Training System FY Contractor and Location Method/Type or Funding Vehicle Ground Hardware - See Remarks 2026 Collins Aerospace / Cedar Rapids, IA C / CPFF ACC Apr 2026 Apr 2028 20 0.525 N Sep 2025 Ground Hardware - See Remarks 2027 Collins Aerospace / Cedar Rapids, IA C / CPFF ACC Apr 2027 Apr 2029 15 0.510 N Sep 2026 Cost Elements O O C P-1 Line Item Number / Title: 834190 / Combat Training Ranges LI 834190 - Combat Training Ranges Air Force Location of PCO Award Date Date of First Delivery UNCLASSIFIED Page 7 of 13 P-1 Line #35 Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date Dec 2025 Volume 1 - 377 === page 414 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834190 / Combat Training Ranges Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Range Equipment MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 Procurement Quantity (Units in Each) - - Gross/Weapon System Cost ($ in Millions) - 37.332 Less PY Advance Procurement ($ in Millions) - - Net Procurement (P-1) ($ in Millions) - 37.332 Plus CY Advance Procurement ($ in Millions) - - Total Obligation Authority ($ in Millions) - 37.332 FY 2027 Base FY 2027 OOC - - - 38.561 - 38.561 115.133 115.133 - - - 38.561 - 38.561 115.133 FY 2027 Total - - - 38.561 - 38.561 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Range Equipment Cost Recurring Cost Range Equipment Upgrades - - - - - 37.332 - - 41.541 - - 31.186 - - - - - 31.186 Subtotal: Recurring Cost - - - - - 37.332 - - 41.541 - - 31.186 - - - - - 31.186 Non Recurring Cost PACAF Range Upgrade - - - - - - - - 73.592 - - 7.375 - - - - - 7.375 Subtotal: Non Recurring Cost - - - - - - - - 73.592 - - 7.375 - - - - - 7.375 Subtotal: Hardware - Range Equipment Cost - - - - - 37.332 - - 115.133 - - 38.561 - - - - - 38.561 Gross/Weapon System Cost - - - - - 37.332 - - 115.133 - - 38.561 - - - - - 38.561 Remarks: Range Equipment funding supports capabilities for legacy and 5th Generation aircraft training and readiness, sustainment and modernization of legacy and Operational Training & Test Infrastructure Investments (i.e. Link-16 radios, modeling, threat control, integrated air display, data aggregation etc.) and increased requirement to support advanced systems. LI 834190 - Combat Training Ranges Air Force UNCLASSIFIED Page 8 of 13 P-1 Line #35 Volume 1 - 378 === page 415 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834190 / Combat Training Ranges Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Radar Signal Emulator MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 4.379 4.549 4.744 - 4.744 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 4.379 4.549 4.744 - 4.744 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 4.379 4.549 4.744 - 4.744 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Radar Signal Emulator Cost Non Recurring Cost RSE Capability AddOns - - - - - 4.379 - - 4.549 - - 4.744 - - - - - 4.744 Subtotal: Non Recurring Cost - - - - - 4.379 - - 4.549 - - 4.744 - - - - - 4.744 Subtotal: Hardware - Radar Signal Emulator Cost - - - - - 4.379 - - 4.549 - - 4.744 - - - - - 4.744 Gross/Weapon System Cost - - - - - 4.379 - - 4.549 - - 4.744 - - - - - 4.744 Remarks: Radar Signal Emulators (RSEs) support Joint Pacific Alaska Range Complex (JPARC) and the Nevada Test and Training Range. RSE modification costs will vary each year based on frequency band, changes in threat characteristics, power upgrades, and required hardware differences between systems being procured. FY 2027 funding supports modification and updated threat characteristics of fielded systems. LI 834190 - Combat Training Ranges Air Force UNCLASSIFIED Page 9 of 13 P-1 Line #35 Volume 1 - 379 === page 416 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834190 / Combat Training Ranges Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Combat Training Range Equipment MDAP/MAIS Code: Resource Summary Prior Years FY 2025 Procurement Quantity (Units in Each) - Gross/Weapon System Cost ($ in Millions) - Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) - Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) - FY 2026 - 191.391 191.391 191.391 FY 2027 Base FY 2027 OOC FY 2027 Total - - - - - - - - - - - - - - - - - - - - - - - - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - PMTEC Combat Training Range Cost Recurring Cost Advanced Threat Emitters - - - - - 81.233 - - - - - - - - - - - - Fiber Infrastructure - - - - - 91.709 - - - - - - - - - - - - SATCOM/5G Infrastructure - - - - - 3.000 - - - - - - - - - - - - Mobile Radio Equipment - - - - - 1.000 - - - - - - - - - - - - Air-to-Air Training Pods - - - - - 14.449 - - - - - - - - - - - - Subtotal: Recurring Cost - - - - - 191.391 - - - - - - - - - - - - Subtotal: Hardware PMTEC Combat Training Range Cost - - - - - 191.391 - - - - - - - - - - - - Gross/Weapon System Cost - - - - - 191.391 - - - - - - - - - - - - Remarks: Starting in FY 2024, the USAF supported US Indo-Pacific Command's Pacific Multi-domain Training and Experimentation Capability (PMTEC) initiative which includes enhancement of infrastructure and facilities in the vicinity of Guam and along the Second Island Chain (SIC) to build a live air-to-air training range that will support joint interoperability for maritime strike, war-at-sea, high-end training, and LVC/live-synthetic requirements. This initiative is designed to generate joint readiness, test emerging capabilities, and drive theater-appropriate requirements in a fully instrumented live, virtual, constructive training area. FY 2026 funding and beyond for this effort will be captured under Range Equipment for simplicity of execution. LI 834190 - Combat Training Ranges Air Force UNCLASSIFIED Page 10 of 13 P-1 Line #35 Volume 1 - 380 === page 417 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834190 / Combat Training Ranges Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Live Mission Operations Capability MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 28.138 18.827 31.138 - 31.138 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 28.138 18.827 31.138 - 31.138 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 28.138 18.827 31.138 - 31.138 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - LMOC Cost Recurring Cost (†) - - - 2.625 18.372 2.600 7.800 2.661 21.287 - - - 2.661 LMOC Platform ECP - - - - - 1.232 - - - - - - - - - - - - Subtotal: Recurring Cost - - - - - 19.604 - - 7.800 - - 21.287 - - - - - 21.287 Subtotal: Hardware - LMOC Cost - - - - - 19.604 - - 7.800 - - 21.287 - - - - - 21.287 Program Support Cost Contractor Services - - - 0.398 3.579 0.260 30 7.800 0.265 30 7.950 - - - 0.265 30 7.950 Program Support Cost Other Government Costs - - - - - 1.345 - - 0.449 - - 0.391 - - - - - 0.391 Program Support Cost Other Government Costs - Corona - - - - - 3.610 - - 2.778 - - 1.510 - - - - - 1.510 Subtotal: Support - LMOC Cost - - - - - 8.534 - - 11.027 - - 9.851 - - - - - 9.851 Gross/Weapon System Cost - - - - - 28.138 - - 18.827 - - 31.138 - - - - - 31.138 LMOC Platform 7 3 8 8 21.287 Support - LMOC Cost 9 Remarks: LMOC Program Support Costs. Program Support Costs are defined as direct, unique program costs (other than payroll costs for government personnel) required for the operation of a program office in its management and oversight role. The financing of program support costs must be consistent with a) the type of work being performed; b) where the program resides within the acquisition phase (lifecycle); and c) existing regulatory and statutory doctrine, including coverage governing the purpose of an appropriation. (T-1). FY27 target installs is up to 8. LI 834190 - Combat Training Ranges Air Force UNCLASSIFIED Page 11 of 13 P-1 Line #35 Volume 1 - 381 === page 418 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 P-1 Line Item Number / Title: 834190 / Combat Training Ranges ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Live Mission Operations Capability MDAP/MAIS Code: LMOC MAJCOM FM, FOA or DRU Offices will budget program support costs on an annual basis and reflect in the FY the requirement is projected to execute; requirements will be budgeted and executed in the weapon system or PEC within the procurement, RDT&E, or O&M appropriations. (T-1). For multi-year appropriations, execution of program support costs may occur in any year of funds currently available. (†) indicates the presence of a P-5a LI 834190 - Combat Training Ranges Air Force UNCLASSIFIED Page 12 of 13 P-1 Line #35 Volume 1 - 382 === page 419 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements LMOC Platform LMOC Platform LMOC Platform O O C P-1 Line Item Number / Title: 834190 / Combat Training Ranges Method/Type or Funding Vehicle Item Number / Title [DODIC]: Live Mission Operations Capability Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty FY Contractor and Location 2025 Georgia Tech Research Institute / Atlanta, GA C / IDIQ Redstone Arsenal, AL Oct 2024 Dec 2024 7 2.625 Y 2026 Georgia Tech Research Institute / Atlanta, GA C / IDIQ Redstone Arsenal, AL Oct 2025 Dec 2025 3 2.600 Y 2027 Georgia Tech Research Institute / Atlanta, GA C / IDIQ Redstone Arsenal, AL Oct 2026 Dec 2026 8 2.661 Y (Each) RFP Issue Date Jul 2024 Remarks: LMOC Platform - the cost per installation is variable due to size of the site and whether it is a new install or an expansion of a previous install. LI 834190 - Combat Training Ranges Air Force UNCLASSIFIED Page 13 of 13 P-1 Line #35 Volume 1 - 383 === page 420 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 384 === page 421 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834210 / Minimum Essential Emergency Comm N Equip / BSA 4: Spcl Comm-Electronics Projects Program Elements for Code B Items: 0303131F ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0101125F, 1203001SF Line Item MDAP/MAIS Code: MDS Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 55.317 51.463 486.762 486.762 - - 55.317 51.463 486.762 - - 55.317 51.463 279.516 - - 279.516 - - 279.516 - 279.516 279.516 279.516 112.210 112.210 112.210 98.276 98.276 98.276 111.435 111.435 111.435 To FY 2031 Complete - - 96.182 0.000 - - 96.182 0.000 - - 96.182 0.000 Total 1,291.161 1,291.161 1,291.161 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The Minimum Essential Emergency Communications Network (MEECN) portfolio modernizes the systems necessary to effectively provide assured communications connectivity between the President and the strategic deterrence forces in stressed environments. FY27 funding increase supports multiple New Start programs and transfers to satisfy NC3 Upgrades. Programs described below detail the efforts and justify the increase in fund from FY26 to FY27 and include MMP Service Life Extension Program, Cyber Implementation Pilot (CIP), FAB-T Command Post Terminals (CPT), Presidential & National Voice Conferencing (PNVC) Integrator. The legacy Minuteman Minimum Essential Emergency Communications Network (MEECN) Program (MMP) provides the only survivable, secure, protected, and jam-resistant communications link to ensure the President can direct ICBM nuclear forces during all phases of a nuclear conflict. The MMP Service Life Extension Program (SLEP) is critical to ensure MMP stays functional until the follow-on system can be fielded. This happens though the replacement of inadequate and unsustainable strategic Extremely High Frequency (EHF) and Very Low Frequency (VLF) communications equipment as well as ensuring the spares availability issue is resolved. SLEP will ensure MMP interfaces and communicates with all newly fielded Nuclear Command, Control, and Communications (NC3) systems throughout the Department of War (DoW). The Cyber Instrumentation Pilot (CIP) suite of solutions provides in-depth situational awareness of NC3 operational health, performance, and cybersecurity posture. It also provides enhanced monitoring that will enable proactive identification and mitigation of system degradations and cyber threats, ensuring continuous, reliable, and secure operation of the nation's nuclear deterrent. Procurement enables the implementation and installation of Sensor Kits a critical effort to instrument and analyze key cyber terrain within the NC3 architecture, expanding existing cyberspace awareness on DoW networks and systems. The Family of Advanced Beyond Line-of-Sight Terminals (FAB-T) Command Post Terminals (CPT) program replaces legacy Milstar terminals and will provide Extremely High Frequency (EHF), protected high data rate communication for nuclear and conventional forces to include Presidential and National Voice Conferencing (PNVC). FY 2027 transfer of FAB-T CPT and PNVC programs from Space Force (PE 1203001SF / Weapon System Code (WSC) FBLOST / Appropriation 3022 / Procurement Space Force (PSF)) to Air Force (Program Element (PE 0303131F)) / WSC 834210 / Appropriation 3080 / Other Procurement (OPAF), Transfer Memo signed 18 Dec 2025. FAB-T CPT provides a new, highly secure, state-of-the-art capability for Department of War (DoW) platforms to include strategic platforms and airborne/ground command posts via Milstar, Advanced EHF (AEHF), and Evolved Strategic SATCOM (ESS) satellite constellations. FAB-T CPTs will also support the critical command and control (C2) of the Milstar, AEHF, and ESS satellite constellations. In June 2014, LI 834210 - Minimum Essential Emergency Comm N Air Force UNCLASSIFIED Page 1 of 29 P-1 Line #36 Volume 1 - 385 === page 422 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834210 / Minimum Essential Emergency Comm N Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: 0303131F Other Related Program Elements: 0101125F, 1203001SF Line Item MDAP/MAIS Code: MDS the Department of the Air Force down-selected to Raytheon for production of FAB-T CPT. Production contract options to produce CPT terminals were exercised after a successful Milestone C decision was approved September 1, 2015. In FY 2019, the FAB-T Program Management Office executed the final Low Rate Initial Production (LRIP) procurement to complete the total of 84 LRIP CPTs on contract. Research, Development, Test, and Evaluation (RDT&E) funding for the FAB-T CPT exhibit is contained in PE 0303131F. PNVC Integrator project is a critical element of the Nuclear Command, Control, and Communications (NC3) System. PNVC integrator replaces the Survivable Emergency Conferencing Network (SECN) capability, and will provide anti-jam, anti-scintillation, survivable, and enduring voice communications via the AEHF, and ESS satellite constellations for national and strategic users. Equipment upgrades required for this system include the development and production of several new components by other organizations, including the Baseband Interface Group (BIG) and Multi-Stream Summing Device (MSD III) for airborne users and the Baseband Kit (BBK) / PNVC Equipment enclosure for mobile users. The PNVC Integrator is responsible for all program elements and funding, including those related to the Defense Information Systems Agency (DISA) and National Security Agency (NSA) components of the PNVC system, in accordance with the transfer directed in the FY 2018 National Defense Authorization Act, Sec. 1661. PNVC funds were transferred from DISA to the Department of the Air Force (DAF) beginning in FY 2021, and the PNVC Integrator will continue to procure remaining PNVC equipment until all fielding is complete. In October 2021, PNVC completed Milestone B/C. RDT&E funding for the PNVC Integrator exhibit is contained in PE 0303131F. Global Aircrew Strategic Network Terminal (Global ASNT) replaces antiquated, unsustainable strategic communications equipment at bomber, tanker and reconnaissance Wing Command Posts (WCPs) and for Mobile Support Teams (MSTs). Global ASNT is a ground-based system that provides survivable, secure communication paths to receive Emergency Action Messages (EAMs), Force Management messages, and Force Direction messages and disseminates them to bomber, tanker, and reconnaissance aircrews. Global ASNT is being fielded in separate capability increments. Global ASNT Increment 1 fields required Extremely High Frequency/Advanced Extremely High Frequency (EHF/AEHF) capabilities and replaces antiquated, unsustainable strategic mobile and fixed-site Single Channel Anti-jam Man-Portable (SCAMP) terminals and Secure, Mobile, Anti-Jam, Reliable, Tactical - Terminal (SMART-T) equipment. Global ASNT Increment 1 has installed 88 terminals to date with 2 terminals remaining. The anticipated installation date for these 2 terminals is 4QTR FY2026. Full Operational Capability (FOC) was declared in 2QTR FY2026. Global ASNT Increment 2 Block 1 will field an Aircrew Alerting System (AAS) consisting of personal and general alerting equipment, and High Frequency (HF) and Ultra High Frequency (UHF) capabilities. Increment 2 replaces antiquated, unsustainable Electromagnetic Pulse Hardened Dispersal Communication (EHDC) systems and Aircrew Alerting Communications Electromagnetic Pulse (AACE) systems. Global ASNT Increment 2 Block 2 provides High Frequency (HF) Beyond Line of Sight (BLOS) capabilities for fixed ground and transportable units to communicate with bomber and tanker aircraft, and emerging NC3 platforms out of range of Ultra High Frequency (UHF) Line of Sight (LOS). RDT&E funding for the Global ASNT Increment 2 exhibit is contained in PE 0303131F. LI 834210 - Minimum Essential Emergency Comm N Air Force UNCLASSIFIED Page 2 of 29 P-1 Line #36 Volume 1 - 386 === page 423 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834210 / Minimum Essential Emergency Comm N Equip / BSA 4: Spcl Comm-Electronics Projects Program Elements for Code B Items: 0303131F ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0101125F, 1203001SF Line Item MDAP/MAIS Code: MDS Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 Minimum Essential Emergency Comm N B - / - / - - / 11.142 / - - P-3a 1 / MMP-SLEP (Service Life Extension) B - / - - / 0.000 - / 0.000 - / 16.000 - / 0.000 - / 16.000 P-3a 2 / CIP (Other) B - / - - / 0.000 - / 0.000 - / 100.000 - / 0.000 - / 100.000 P-3a 3 / GASNTi1 (Capability Improvement) A - / 443.865 - / 39.530 - / 12.746 - / 60.310 - / 0.000 - / 60.310 P-3a 4 / GASNTi2 (Capability Improvement) B - / 42.897 - / 15.787 - / 38.717 - / 92.064 - / 0.000 - / 92.064 P-40 Total Gross/Weapon System Cost - / 486.762 - / 55.317 - / 51.463 - / 279.516 / - - / 279.516 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code - / - - - - / 11.142 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 Minimum Essential Emergency Comm N B / - - / - P-3a 1 / MMP-SLEP (Service Life Extension) B - - / 16.000 / - - / 16.000 / - - / 16.000 / - - / 15.000 - / - - / 79.000 P-3a 2 / CIP (Other) B - / 0.000 - / 0.000 - / 0.000 - / 0.000 P-3a 3 / GASNTi1 (Capability Improvement) A - / 0.522 - / 1.390 - / 2.160 - / 2.204 P-3a 4 / GASNTi2 (Capability Improvement) B - / 91.674 - / 76.800 - / 89.100 - / 78.978 P-40 Total Gross/Weapon System Cost - / 112.210 - / 98.276 - / 111.435 - / 96.182 - - / - / - - / 100.000 / 0.000 - / 562.727 / - - / 0.000 - / 526.017 / 1,291.161 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: This program, P-3A Mod MEECN 3, MMP-SLEP, is a new start. This program, P-3A Mod MEECN 4, CIP, is a new start. MMP SLEP funds will support production and deployment requirements to include procurement, installation, checkout and initial spares of communications equipment. In FY2027 Cyber Instrumentation Pilot (CIP) funds support production activities including site surveys in advance of installations, procurement and installation of CIP systems (mostly comprised of commercial off the shelf (COTS) equipment), Engineering support, Integration engineering, Interface documentation, Minor configuration adjustments, Production testing, quality assurance testing, operational testing associated with quality assurance, interim contractor support, Initial spares, Program Office support, FFRDC, Government test support, and Other Government Costs (OGC). In FY 2027, FAB-T CPT will continue activities that ensure CPT terminal interoperability with the full AEHF satellite constellation, provide interim contractor support for the existing fielded terminals, sparing and repairs in preparation for long-term hardware, software, and crypto sustainment. In FY 2027, PNVC Integrator will continue to procure any remaining PNVC equipment required for fielding activities and provide support capability for fielded units. Note that FY 2027 is planned to be the last year for interim contractor support, after that contractor support will shift to the operations and maintenance budget. LI 834210 - Minimum Essential Emergency Comm N Air Force UNCLASSIFIED Page 3 of 29 P-1 Line #36 Volume 1 - 387 === page 424 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834210 / Minimum Essential Emergency Comm N Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: 0303131F Other Related Program Elements: 0101125F, 1203001SF Line Item MDAP/MAIS Code: MDS Activities may also include program office support, studies, technical analysis, prototyping, training, and mitigations to address Diminishing Manufacturing Sources and Material Shortages associated with production and fielding and sustainment of the AEHF family of terminals. Global ASNT Increment 1 funds support production activities including preparation and planning for depot standup, engineering activities, schedule preparation and planning, production configuration control, production roadmap activities, site installations, and Interim Contractor Support (ICS). FY2027 funds will support Interim Contractor Support (ICS), and Program Office activities including planning for depot standup, engineering activities, schedule preparation and planning, and production configuration and control. FY2027 funds may also be used to support initial Security Classification Guide (SCG) implementation activities. This program has overarching diminishing manufacturing sources (DMS) requirements and as such may need to use procurement funding to address these requirements, such as qualifying a second source for the Microwave Power Modules. Global ASNT Increment 2 Block 1 will field an Aircrew Alerting System (AAS) consisting of personal and general alerting equipment, and High Frequency (HF) and Ultra High Frequency (UHF) capabilities. Increment 2 replaces antiquated, unsustainable Electromagnetic Pulse Hardened Dispersal Communication (EHDC) systems and Aircrew Alerting Communications Electromagnetic Pulse (AACE) systems. Global ASNT Increment 2 Block 1 funds support production and deployment requirements including procurement, installation, and check-out of 20 non-High-Altitude Electromagnetic Pulse (HEMP) systems, 70 HEMP-hardened systems, and 20 HEMP systems to replace the non-HEMP systems; also included are hosting operator and maintainer training courses, site surveys in advance of installations, initial spares, ICS, Contractor Logistics Support (CLS), Program Office support, Government test support, and Other Government Costs (OGC). FY2027 funds will support ICS of non-HEMP systems and procurement of HEMP systems; funds will also support change orders, hosting operator and maintainer training courses, site surveys in advance of installations, initial spares, ICS, DMS hardware replacements, system modifications, Program Office Support, Government Test Support, and OGC. Global ASNT Increment 2 Block 2 funds support production activities including production standup, preparation and planning for depot standup, engineering activities, schedule preparation and planning, production configuration control, production roadmap activities, and site installations. Efforts with funding starting in FY 2028 through FY 2031 are summarized on the P-40. Not all details of this funding are included in this P-40 exhibit set. A summary of the excepted details is as follows: (a) (b) (c) (d) LI 834210 - Minimum Essential Emergency Comm N Air Force FY 2028 Cost Delta: 4.014 million FY 2029 Cost Delta: 4.086 million FY 2030 Cost Delta: 4.175 million FY Total Cost Delta: 23.417 million UNCLASSIFIED Page 4 of 29 P-1 Line #36 Volume 1 - 388 === page 425 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834210 / Minimum Essential Emergency Comm N Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: Minimum Essential Emergency Comm N MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - - - 11.142 - 11.142 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - - - 11.142 - 11.142 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - - - 11.142 - 11.142 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - FAB-T CPT Cost Recurring Cost FAB-T Terminals - - - - - - - - - - - 0.295 - - - - - 0.295 Technical Mission Analysis - - - - - - - - - - - 0.202 - - - - - 0.202 Subtotal: Recurring Cost - - - - - - - - - - - 0.497 - - - - - 0.497 Subtotal: Hardware - FAB-T CPT Cost - - - - - - - - - - - 0.497 - - - - - 0.497 Hardware - Presidential & National Voice Conferencing (PNVC) Cost Recurring Cost BBKs/PNVC Equipment - - - - - - - - - - - 1.454 - - - - - 1.454 Subtotal: Recurring Cost - - - - - - - - - - - 1.454 - - - - - 1.454 Subtotal: Hardware Presidential & National Voice Conferencing (PNVC) Cost - - - - - - - - - - - 1.454 - - - - - 1.454 Interim Contractor Support - - - - - - - - - - - 4.008 - - - - - 4.008 Logistics - FAB-T CPT Cost Recurring Cost Depot Activation - - - - - - - - - - - 3.288 - - - - - 3.288 Subtotal: Recurring Cost - - - - - - - - - - - 7.296 - - - - - 7.296 Subtotal: Logistics - FAB-T CPT Cost - - - - - - - - - - - 7.296 - - - - - 7.296 LI 834210 - Minimum Essential Emergency Comm N Air Force UNCLASSIFIED Page 5 of 29 P-1 Line #36 Volume 1 - 389 === page 426 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834210 / Minimum Essential Emergency Comm N Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: Minimum Essential Emergency Comm N MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Support - FAB-T CPT Cost FAB-T A&AS - - - - - - - - - - - 0.950 - - - - - 0.950 Other Support - - - - - - - - - - - 0.945 - - - - - 0.945 Subtotal: Support - FAB-T CPT Cost - - - - - - - - - - - 1.895 - - - - - 1.895 Gross/Weapon System Cost - - - - - - - - - - - 11.142 - - - - - 11.142 LI 834210 - Minimum Essential Emergency Comm N Air Force UNCLASSIFIED Page 6 of 29 P-1 Line #36 Volume 1 - 390 === page 427 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 834210 / Minimum Essential Emergency Comm N Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : B Resource Summary Modification Number / Title: 1 / MMP-SLEP MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 0.000 0.000 16.000 0.000 16.000 16.000 16.000 16.000 15.000 - 79.000 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 0.000 0.000 16.000 0.000 16.000 16.000 16.000 16.000 15.000 - 79.000 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 0.000 0.000 16.000 0.000 16.000 16.000 16.000 16.000 15.000 - 79.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: This program, P-3A Mod MEECN 3, MMP-SLEP, is a new start. Minuteman Minimum Essential Emergency Communications (MEECN) Program (MMP) Service Life Extension Program (SLEP) required to bridge the gap between the current legacy system and the replacement program, SENTINEL currently in acquisition. The SLEP program will develop and modernize key MMP components designed to keep the current system viable until SENTINEL is fielded. The MMP SLEP will enable the legacy MMP System that is beyond end-of-life to continue to provide Intercontinental Ballistic Missile (ICBM) Forces with a survivable link for reception of Emergency Action Messages (EAMs) from the President and Secretary of War (SECWAR). MMP is a Command and Control (C2) system directly supporting the Chairman of the Joint Chiefs of Staff in the National Command Center and the Strategic Nuclear Command Centers. MMP provides super high-frequency (SHF) down-link/extremely high-frequency (EHF) up-link and very low-frequency (VLF)/low-frequency (LF) messaging support for Minuteman III ICBM Launch Control Centers (LCCs). The MMP SLEP is needed to support the Minuteman III weapon system, beyond its expected service life of 2030. The significant delay to the Sentinel requires life extension program of the current Minuteman III system, and subsystems that include MMP. Diminishing Manufacturing Sources and Material Shortages (DMSMS) have resulted in spare parts being in short supply. Without a SLEP, access to MMP spare parts will become increasingly difficult, resulting in extended system downtime and high repair costs. The MMP operational availability will continue to decrease, and future modifications will not be addressed creating a significant gap in capability, further reducing our nation's nuclear deterrence. Milestone/Development Status MMP has implemented Diminishing Manufacturing Sources and Material Shortage (DMSMS) risk reduction efforts utilizing Operations and Maintenance (O&M) funding for Operator Processing Units (OPU), Shop Replaceable Unit (SRU), and Solid-State Amplifier (SSA) allowing these requirements to proceed directly to procurement. VLF modification is an organic effort through the Naval Intelligence Warfare Center (NIWC)and will start with development utilizing RDT&E funding in the 3d quarter of FY27 and move into production in FY29. B-Kits: Each component requires fielding to 45 LCCs totaling 180 B-Kits. LI 834210 - Minimum Essential Emergency Comm N Air Force UNCLASSIFIED Page 7 of 29 P-1 Line #36 Volume 1 - 391 === page 428 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 834210 / Minimum Essential Emergency Comm N Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : B MDAP/MAIS Code: Models of Systems Affected: MMPSLEP Related RDT&E PEs: 0101125F Modification Type: Service Life Extension Prior Years Financial Plan Modification Number / Title: 1 / MMP-SLEP FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 4: OPU Re-Fresh B Kits Recurring - / - - / - - / - 23 / 2.625 - / - 23 / 2.625 22 / 2.000 - / - - / - - / - - / - 45 / 4.625 Subtotal: Recurring OPU Re-Fresh:EQUIPMENT Group B (Active) - / - - / - - / - - / 2.625 - / - - / 2.625 - / 2.000 - / - - / - - / - - / - - / 4.625 Subtotal: OPU Re-Fresh - / - - / - - / - - / 2.625 - / - - / 2.625 - / 2.000 - / - - / - - / - - / - - / 4.625 - / - - / - - / - 15 / 2.500 - / - 15 / 2.500 15 / 3.500 - / - - / - - / - 45 / 9.500 - / - - / - - / - - / 2.500 - / - - / 2.500 - / 3.500 - / 3.500 - / - - / - - / - - / 9.500 - / - - / - - / - - / 2.500 - / - - / 2.500 - / 3.500 - / 3.500 - / - - / - - / - - / 9.500 Modification Item 2 of 4: SRU Respin B Kits Recurring SRU Respin:EQUIPMENT Group B (Active) Subtotal: Recurring Subtotal: SRU Respin 15 / 3.500 Modification Item 3 of 4: SSA Re-Engineering B Kits Recurring - / - - / - - / - 9 / 9.875 - / - 9 / 14.000 - / - 45 / 50.875 Subtotal: Recurring SSA Re-Engineering:EQUIPMENT Group B (Active) - / - - / - - / - - / 9.875 - / - - 9 / 9.875 / 9.875 - 9 / 9.500 / 9.500 - 9 / 7.500 / 7.500 - 9 / 10.000 / 10.000 - / 14.000 - / - - / 50.875 Subtotal: SSA Re-Engineering - / - - / - - / - - / 9.875 - / - - / 9.875 - / 9.500 - / 7.500 - / 10.000 - / 14.000 - / - - / 50.875 - / - - / - - / - - / - - / - - / - - / - 22 / 4.000 23 / 5.000 - / - - / - 45 / 9.000 - / - - / - - / - - / - - / - - / - - / - - / 4.000 - / 5.000 - / - - / - - - / - - / - - / - - / - - / - - / - - / - - / 4.000 - / 5.000 - / - - / - - - / - - / - - / - / 15.000 - / - / 14.000 - / - - / - - / - - / - - / 1.000 - / - - / 1.000 - / 1.000 - / 1.000 - / 1.000 - / 1.000 - / - - / 5.000 - / - - / - - / - - / 1.000 - / - - / 1.000 - / 1.000 - / 1.000 - / 1.000 - / 1.000 - / - - / 5.000 - / - - / - - / - / - - / - / - - / - Modification Item 4 of 4: VLF Modification B Kits Recurring VLF Modification:EQUIPMENT Group B (Active) Subtotal: Recurring Subtotal: VLF Modification Subtotal: Procurement, All Modification Items - / 15.000 - / 15.000 - / 15.000 - / 15.000 - - / 9.000 / 9.000 / 74.000 - Support (All Modification Items) A&AS Subtotal: Support Installation Subtotal: Installation LI 834210 - Minimum Essential Emergency Comm N Air Force - UNCLASSIFIED Page 8 of 29 - / - - / - - / - P-1 Line #36 - / - - - / - Volume 1 - 392 === page 429 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 834210 / Minimum Essential Emergency Comm N Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : B MDAP/MAIS Code: Models of Systems Affected: MMPSLEP Related RDT&E PEs: 0101125F Modification Type: Service Life Extension Prior Years Financial Plan Modification Number / Title: 1 / MMP-SLEP FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Total Cost (Procurement + Support + Installation) - LI 834210 - Minimum Essential Emergency Comm N Air Force 0.000 0.000 16.000 0.000 UNCLASSIFIED Page 9 of 29 16.000 16.000 16.000 P-1 Line #36 16.000 15.000 - 79.000 Volume 1 - 393 === page 430 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 P-1 Line Item Number / Title: 834210 / Minimum Essential Emergency Comm N ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: 1 / MMP-SLEP MDAP/MAIS Code: Modification Item 1 of 4: OPU Re-Fresh Manufacturer Information Manufacturer Name: Collins (Raytheon) Manufacturer Location: Marlboro, MA Administrative Leadtime (in Months): 3 Dates FY 2025 Production Leadtime (in Months): 6 FY 2026 FY 2027 FY 2028 Contract Dates Mar 2027 Mar 2028 Delivery Dates Sep 2027 Sep 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation (Organic): Org/Intermediate LI 834210 - Minimum Essential Emergency Comm N Air Force Installation Quantity: 45 UNCLASSIFIED Page 10 of 29 P-1 Line #36 Volume 1 - 394 === page 431 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 P-1 Line Item Number / Title: 834210 / Minimum Essential Emergency Comm N ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: 1 / MMP-SLEP MDAP/MAIS Code: Modification Item 2 of 4: SRU Respin Manufacturer Information Manufacturer Name: Collins (Raytheon) Manufacturer Location: Marlboro, MA Administrative Leadtime (in Months): 3 Dates FY 2025 Production Leadtime (in Months): 8 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Mar 2027 Mar 2028 Mar 2029 Delivery Dates Nov 2027 Nov 2028 Nov 2029 FY 2030 FY 2031 Installation Information Method of Implementation (Organic): Org/Intermediate LI 834210 - Minimum Essential Emergency Comm N Air Force Installation Quantity: 45 UNCLASSIFIED Page 11 of 29 P-1 Line #36 Volume 1 - 395 === page 432 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 P-1 Line Item Number / Title: 834210 / Minimum Essential Emergency Comm N ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: 1 / MMP-SLEP MDAP/MAIS Code: Modification Item 3 of 4: SSA Re-Engineering Manufacturer Information Manufacturer Name: Collins (Raytheon) Manufacturer Location: Marlbor,MA Administrative Leadtime (in Months): 3 Dates FY 2025 Production Leadtime (in Months): 6 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2027 Mar 2028 Mar 2029 Mar 2030 Mar 2031 Delivery Dates Jul 2027 Sep 2028 Sep 2029 Sep 2030 Sep 2031 Installation Information Method of Implementation (Organic): Org/Intermediate LI 834210 - Minimum Essential Emergency Comm N Air Force Installation Quantity: 45 UNCLASSIFIED Page 12 of 29 P-1 Line #36 Volume 1 - 396 === page 433 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 P-1 Line Item Number / Title: 834210 / Minimum Essential Emergency Comm N ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: 1 / MMP-SLEP MDAP/MAIS Code: Modification Item 4 of 4: VLF Modification Manufacturer Information Manufacturer Name: Naval Intelligence Warfare Center (NIWC) Manufacturer Location: San Diego, CA Administrative Leadtime (in Months): 3 Dates FY 2025 Production Leadtime (in Months): 10 FY 2026 FY 2027 FY 2029 FY 2030 Contract Dates FY 2028 Mar 2029 Mar 2030 Delivery Dates Jan 2030 Jan 2031 FY 2031 Installation Information Method of Implementation (Organic): Org/Intermediate LI 834210 - Minimum Essential Emergency Comm N Air Force Installation Quantity: 45 UNCLASSIFIED Page 13 of 29 P-1 Line #36 Volume 1 - 397 === page 434 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 P-1 Line Item Number / Title: 834210 / Minimum Essential Emergency Comm N ID Code (A=Service Ready, B=Not Service Ready) : B Resource Summary Modification Number / Title: 2 / CIP MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 0.000 0.000 0.000 0.000 - Procurement Quantity (Units in Each) - - - Gross/Weapon System Cost ($ in Millions) - 0.000 0.000 Less PY Advance Procurement ($ in Millions) - - - Net Procurement (P-1) ($ in Millions) - 0.000 0.000 Plus CY Advance Procurement ($ in Millions) - - - Total Obligation Authority ($ in Millions) - 0.000 0.000 100.000 - 0.000 - 100.000 - 0.000 - 100.000 0.000 100.000 100.000 100.000 To FY 2031 Complete - - - - - 0.000 0.000 0.000 0.000 - - - - - - 0.000 0.000 0.000 0.000 - Total 100.000 100.000 100.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: This program, P-3A Mod MEECN 4, CIP, is a new start. The Minimum Essential Emergency Communications Network (MEECN) portfolio modernizes the systems necessary to effectively provide assured communications connectivity between the President and the strategic deterrence forces in stressed environments. The Cyber Instrumentation Pilot (CIP) originated as a USSTRATCOM-sponsored initiative, executed in partnership with USCC and other agencies, that demonstrates the capabilities of a suite of sensing and monitoring solutions on key DoW networks and systems. Service procurement of CIP solutions will enable maturation of capabilities by increasing scale and scope, and provide comprehensive sensing and monitoring capability for the Air Force's Nuclear Command, Control, and Communications (NC3) weapon system. The CIP suite of solutions provides in-depth situational awareness of NC3 operational health, performance, and cybersecurity posture. It also provides enhanced monitoring that will enable proactive identification and mitigation of system degradations and cyber threats, ensuring continuous, reliable, and secure operation of the nation's nuclear deterrent. Procurement directly supports and enables the implementation and installation of Sensor Kits a critical effort to instrument and analyze key cyber terrain within the NC3 architecture, expanding existing cyberspace awareness on Department of War (DoW) networks and systems. This capability will significantly strengthen the resilience and survivability of Air Force NC3 systems against emerging cyber threats and advance broader DoW initiatives to improve cybersecurity of critical national capabilities. CIP is a key component in modernizing our nuclear enterprise and guaranteeing the President's ability to command and control nuclear forces without failure. Milestone/Development Status The CIP prototype is a high-Technical Readiness Level (TRL) suite of mostly Commercial Off-The-Shelf (COTS) cyber sensing tools currently operating on live DoW networks, and has undergone some amount of testing in an operationally representative environment. Production and Deployment (P&D) requirements include procurement, installation, and check-out of 84 Sensor systems, 10 Mini-Security Operations Center (Mini-SOC) systems; also included are Contract SOC Manning, site surveys in advance of installations, Technical support for cyberspace operation and integration, weapon system configuration management, initial spares, Interim Contractor Support (ICS), Contractor Logistics Support (CLS), Program Office Support, Government Test Support, Other Government Costs (OGC) and initial Security Classification Guide (SCG) implementation activities. LI 834210 - Minimum Essential Emergency Comm N Air Force UNCLASSIFIED Page 14 of 29 P-1 Line #36 Volume 1 - 398 === page 435 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 834210 / Minimum Essential Emergency Comm N Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : B MDAP/MAIS Code: Models of Systems Affected: CIP Modification Type: Other Prior Years Financial Plan Modification Number / Title: 2 / CIP FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 3: CIP Sensor B Kits Recurring CIP Sensor:EQUIPMENT Group B (Active) - / - - / - - / - 84 / 57.320 - / - 84 / 57.320 - / - - / - - / - - / - - / - 84 / 57.320 - / - - / - - / - - / 57.320 - / - - / 57.320 - / - - / - - / - - / - - / - - / 57.320 - / - - / - - / - - / 57.320 - / - - / 57.320 - / - - / - - / - - / - - / - - / 57.320 - / - - / - - / - 94 / 1.676 - / - 94 / 1.676 - / - - / - - / - - / - - / - 94 / 1.676 - / - - / - - / - - / 1.676 - / - - / 1.676 - / - - / - - / - - / - - / - - / 1.676 - / - - / - - / - - / 1.676 - / - - / 1.676 - / - - / - - / - - / - - / - - / 1.676 - / - - / - - / - 10 / 6.337 - / - 10 / 6.337 - / - - / - - / - - / - - / - 10 / 6.337 - / - - / - - / - - / 6.337 - / - - / 6.337 - / - - / - - / - - / - - / - - - / - - / - - / - - / 6.337 - / - - / 6.337 - / - - / - - / - - / - - / - - - / - - / - - / - - / 65.333 - / - - / 65.333 - / - - / - - / - - / - - / - - SUPPORT-EQUIP - / - - / - - / - - / 19.367 - / - - / 19.367 - / - - / - - / - - / - - / - - Change Orders - / - - / - - / - - / 1.307 - / - - / 1.307 - / - - / - - / - - / - - / - - / 1.307 A&AS - / - - / - - / - - / 2.450 - / - - / 2.450 - / - - / - - / - - / - - / - - / 2.450 OTHER GOVT - / - - / - - / - - / 6.058 - / - - / 6.058 - / - - / - - / - - / - - / - - / 6.058 FFRDC - / - - / - - / - - / 5.485 - / - - / 5.485 - / - - / - - / - - / - - / - - - / - - / - - / - / 34.667 - / - / 34.667 - / - - / - - / - - / - - / - Modification Item 1 of 3: CIP Sensor - / - - / - - / - 25 / 0.000 - / - 25 / 0.000 47 / 0.000 12 / 0.000 - / - - / - - / - 84 / 0.000 Modification Item 3 of 3: Mini - SOC - / - - / - - / - 3 / 0.000 - / - 3 / 0.000 5 / 0.000 2 / 0.000 - / - - / - - / - 10 / 0.000 Subtotal: Installation - / - - / - - / - 28 / 0.000 - / - 28 / 0.000 52 / 0.000 14 / 0.000 - / - - / - - / - 94 / 0.000 Subtotal: Recurring Subtotal: CIP Sensor Modification Item 2 of 3: COMMON: Sensor-Mini SOC A Kits Recurring COMMON: Sensor-Mini SOC:INSTALL KITS Group A (Active) Subtotal: Recurring Subtotal: COMMON: Sensor-Mini SOC Modification Item 3 of 3: Mini - SOC B Kits Recurring Mini - SOC:EQUIPMENT Group B (Active) Subtotal: Recurring Subtotal: Mini - SOC Subtotal: Procurement, All Modification Items / 6.337 / 6.337 / 65.333 Support (All Modification Items) Subtotal: Support - - - / 19.367 / 5.485 / 34.667 Installation LI 834210 - Minimum Essential Emergency Comm N Air Force UNCLASSIFIED Page 15 of 29 P-1 Line #36 Volume 1 - 399 === page 436 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 834210 / Minimum Essential Emergency Comm N Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : B MDAP/MAIS Code: Models of Systems Affected: CIP Modification Type: Other Prior Years Financial Plan Modification Number / Title: 2 / CIP FY 2025 FY 2026 FY 2027 Base Related RDT&E PEs: FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Total Cost (Procurement + Support + Installation) - LI 834210 - Minimum Essential Emergency Comm N Air Force 0.000 0.000 100.000 0.000 UNCLASSIFIED Page 16 of 29 100.000 0.000 0.000 P-1 Line #36 0.000 0.000 - 100.000 Volume 1 - 400 === page 437 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 834210 / Minimum Essential Emergency Comm N Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: 2 / CIP MDAP/MAIS Code: Modification Item 1 of 3: CIP Sensor Manufacturer Information Manufacturer Name: TBD/options being evaluated Manufacturer Location: TBD Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 1 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Jan 2027 Delivery Dates Feb 2027 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Contract Field Team Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - 25 / 0.000 - / - 12 / 0.000 - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - 25 / 0.000 - / - 12 / 0.000 - / - - / - - / - Installation Cost 25 / 0.000 47 / 0.000 25 / 0.000 47 / 0.000 84 / 0.000 84 / 0.000 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 0 - - - - - - - - - 2 11 12 11 12 11 13 10 2 - - - - - - - - - - 0 84 Out 0 - - - - - - - - - 2 11 12 11 12 11 13 10 2 - - - - - - - - - - 0 84 LI 834210 - Minimum Essential Emergency Comm N Air Force UNCLASSIFIED Page 17 of 29 P-1 Line #36 Volume 1 - 401 === page 438 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 P-1 Line Item Number / Title: 834210 / Minimum Essential Emergency Comm N ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: 2 / CIP MDAP/MAIS Code: Modification Item 2 of 3: COMMON: Sensor-Mini SOC Manufacturer Information Manufacturer Name: N/A Manufacturer Location: N/A Administrative Leadtime (in Months): Dates FY 2025 Production Leadtime (in Months): FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Org/Intermediate LI 834210 - Minimum Essential Emergency Comm N Air Force Installation Quantity: 0 UNCLASSIFIED Page 18 of 29 P-1 Line #36 Volume 1 - 402 === page 439 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 834210 / Minimum Essential Emergency Comm N Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: 2 / CIP MDAP/MAIS Code: Modification Item 3 of 3: Mini - SOC Manufacturer Information Manufacturer Name: TBD/options being evaluated Manufacturer Location: TBD Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 1 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Jan 2027 Delivery Dates Feb 2027 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Contract Field Team Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - 3 / 0.000 - / - 3 / 0.000 5 / 0.000 2 / 0.000 - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - 3 / 0.000 - / - 3 / 0.000 2 / 0.000 - / - - / - - / - Installation Cost 5 / 0.000 10 / 0.000 10 / 0.000 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 0 - - - - - - - - - - 1 2 1 2 1 1 2 - - - - - - - - - - - 0 10 Out 0 - - - - - - - - - - 1 2 1 2 1 1 2 - - - - - - - - - - - 0 10 LI 834210 - Minimum Essential Emergency Comm N Air Force UNCLASSIFIED Page 19 of 29 P-1 Line #36 Volume 1 - 403 === page 440 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 P-1 Line Item Number / Title: 834210 / Minimum Essential Emergency Comm N ID Code (A=Service Ready, B=Not Service Ready) : A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 3 / GASNTi1 MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 39.530 12.746 60.310 0.000 60.310 0.522 1.390 2.160 2.204 0.000 443.865 443.865 - - - - - - - - - - 39.530 12.746 60.310 0.000 60.310 0.522 1.390 2.160 2.204 0.000 443.865 To FY 2031 Complete - - - - - - - - - - 39.530 12.746 60.310 0.000 60.310 0.522 1.390 2.160 2.204 0.000 Total 562.727 562.727 562.727 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The Minimum Essential Emergency Communications Network (MEECN) portfolio modernizes the systems necessary to effectively provide assured communications connectivity between the President and the strategic deterrence forces in stressed environments. Global Aircrew Strategic Network Terminal (Global ASNT) replaces antiquated, unsustainable strategic communications equipment at bomber and tanker Wing Command Posts (WCPs) and for Mobile Support Teams (MSTs). Global ASNT is a ground-based system that will provide survivable, secure communication paths to receive Emergency Action Messages (EAMs), Force Management messages, and Force Direction messages and disseminate them to bomber and tanker aircrews. Global ASNT is being fielded in separate capability increments. Global ASNT Increment 1 fields required Extremely High Frequency/Advanced Extremely High Frequency (EHF/AEHF) capabilities and replaces antiquated, unsustainable strategic mobile and fixed-site Single Channel Anti-jam Man-Portable (SCAMP) terminals and Secure, Mobile, Anti-Jam, Reliable, Tactical - Terminal (SMART-T) equipment. Production year 1 was 48 terminals and Production year 2 was 42 terminals for a total of 90 terminals. Global ASNT Increment 1 has installed 88 terminals to date with 2 terminals remaining. The anticipated installation date for these 2 terminals is 4QTR FY2026. Global ASNT Increment 1 funds support production activities including preparation and planning for depot standup, engineering activities, schedule preparation and planning, production configuration control, production roadmap activities, site installations, and Interim Contractor Support (ICS). FY2027 funds will support ICS, and Program Office activities including planning for depot standup, engineering activities, schedule preparation and planning, and production configuration and control. FY2027 funds may also be used to support initial Security Classification Guide (SCG) implementation activities. This program has overarching diminishing manufacturing sources (DMS) requirements and as such may need to use procurement funding to address these requirements, such as qualifying a second source for the Microwave Power Modules. Milestone/Development Status LI 834210 - Minimum Essential Emergency Comm N Air Force UNCLASSIFIED Page 20 of 29 P-1 Line #36 Volume 1 - 404 === page 441 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 P-1 Line Item Number / Title: 834210 / Minimum Essential Emergency Comm N ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: 3 / GASNTi1 MDAP/MAIS Code: Development and Full Rate Production complete. Fielding of terminals commenced in 2QTR FY2022, with 2 terminals remaining to be installed in 4QTR FY2026. Full Operational Capability (FOC) was declared in 2QTR FY2026. RDT&E funding for Global ASNT Increment 1 Modernization to support Evolved Strategic SATCOM (ESS) and Enterprise Terminal Crypto (ETC) development and integration commences in FY2027. LI 834210 - Minimum Essential Emergency Comm N Air Force UNCLASSIFIED Page 21 of 29 P-1 Line #36 Volume 1 - 405 === page 442 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 834210 / Minimum Essential Emergency Comm N Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A MDAP/MAIS Code: Models of Systems Affected: GASNTi1 Modification Type: Capability Improvement Prior Years Financial Plan Modification Number / Title: 3 / GASNTi1 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 2: GASNTi1 Fixed A Kits Recurring GASNTi1 Fixed:INSTALL KITS Group A (Active) Subtotal: Recurring 23 / 17.113 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 23 / 17.113 / 17.113 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - - / 17.113 B Kits Recurring 43 / 123.930 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 43 / 123.930 Subtotal: Recurring GASNTi1 Fixed:EQUIPMENT Group B (Active) - / 123.930 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 123.930 Subtotal: GASNTi1 Fixed - / 141.043 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 141.043 Modification Item 2 of 2: GASNTi1 Transportable B Kits Recurring GASNTi1 Transportable:EQUIPMENT Group B (Active) Subtotal: Recurring Subtotal: GASNTi1 Transportable Subtotal: Procurement, All Modification Items 47 / 135.648 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 47 / 135.648 - / 135.648 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 135.648 - / 135.648 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 135.648 - / 276.691 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 276.691 Support (All Modification Items) A&AS - / 25.005 / 3.347 - / 1.727 ICS-Labor - / 80.927 - / 18.616 - / 5.007 / 41.312 - / 16.384 / 147.244 - / 38.347 S/W Depot Standup Subtotal: Support - - - - / 5.526 / 12.260 / 5.443 - / - / 52.785 - / - - / 2.082 - / - / 60.310 - / - - / 5.443 / 52.785 - - / 2.082 / 60.310 / / 0.522 - / / 0.522 - - / / 1.390 - / / 1.390 - - / / 2.160 - / / 2.160 - - / - - / - / 2.204 - / - / - - / - / 2.204 - / - - / 35.522 / 163.611 / 65.304 / 264.437 Installation Modification Item 1 of 2: GASNTi1 Fixed 42 / 9.551 1 / 0.210 - / - - / - - / - - / - - / - - / - - / - - / - - / - 43 / 9.761 Modification Item 2 of 2: GASNTi1 Transportable 41 / 10.379 4 / 0.973 2 / 0.486 - / - - / - - / - - / - - / - - / - - / - - / - 47 / 11.838 Subtotal: Installation 83 / 19.930 5 / 1.183 2 / 0.486 - / - - / - - / - - / - - / - - / - - / - - / - 90 / 21.599 443.865 39.530 12.746 0.000 562.727 Total Total Cost (Procurement + Support + Installation) LI 834210 - Minimum Essential Emergency Comm N Air Force 60.310 0.000 UNCLASSIFIED Page 22 of 29 60.310 0.522 1.390 P-1 Line #36 2.160 2.204 Volume 1 - 406 === page 443 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 834210 / Minimum Essential Emergency Comm N Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: 3 / GASNTi1 MDAP/MAIS Code: Modification Item 1 of 2: GASNTi1 Fixed Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Largo, FL Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 16 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Contract Field Team Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 42 / 9.551 Prior Years 1 / 0.210 - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.210 - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 42 / 9.551 43 / 9.761 43 / 9.761 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 42 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - 0 43 Out 42 1 - - - - - - - - - - - - - - - - - - - - - - - - - - - 0 43 LI 834210 - Minimum Essential Emergency Comm N Air Force UNCLASSIFIED Page 23 of 29 P-1 Line #36 Volume 1 - 407 === page 444 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 834210 / Minimum Essential Emergency Comm N Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: 3 / GASNTi1 MDAP/MAIS Code: Modification Item 2 of 2: GASNTi1 Transportable Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Largo, FL Administrative Leadtime (in Months): 6 Dates Production Leadtime (in Months): 16 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Contract Field Team Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) 41 / 10.379 Prior Years 4 / 0.973 2 / 0.486 - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.486 - / - - / - - / - - / - - / - - / - - / - - / - Total 41 / 10.379 4 / 0.973 47 / 11.838 47 / 11.838 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 41 1 - - 3 - - 2 - - - - - - - - - - - - - - - - - - - - - 0 47 Out 41 1 - - 3 - - 2 - - - - - - - - - - - - - - - - - - - - - 0 47 LI 834210 - Minimum Essential Emergency Comm N Air Force UNCLASSIFIED Page 24 of 29 P-1 Line #36 Volume 1 - 408 === page 445 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 P-1 Line Item Number / Title: 834210 / Minimum Essential Emergency Comm N ID Code (A=Service Ready, B=Not Service Ready) : B Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 4 / GASNTi2 MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 42.897 15.787 38.717 92.064 0.000 92.064 91.674 76.800 89.100 78.978 - - - - - - - - - - - - 42.897 15.787 38.717 92.064 0.000 92.064 91.674 76.800 89.100 78.978 - - - - - - - - - - - - 42.897 15.787 38.717 92.064 0.000 92.064 91.674 76.800 89.100 78.978 - Total 526.017 526.017 526.017 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The Minimum Essential Emergency Communications Network (MEECN) portfolio modernizes the systems necessary to effectively provide assured communications connectivity between the President and the strategic deterrence forces in stressed environments. Global Aircrew Strategic Network Terminal (Global ASNT) replaces antiquated, unsustainable strategic communications equipment at bomber and tanker Wing Command Posts (WCPs), and for Mobile Support Teams (MSTs). Global ASNT is a ground-based system that will provide survivable, secure communication paths to receive Emergency Action Messages (EAMs), Force Management messages, and Force Direction messages and disseminate them to bomber and tanker aircrews. Global ASNT is being fielded in separate capability increments. Global ASNT Increment 2 Block 1 delivers an Aircrew Alerting System (AAS) consisting of personal and general alerting equipment, and High Frequency (HF) and Ultra High Frequency (UHF) capabilities. It replaces antiquated, unsustainable Electromagnetic Pulse Hardened Dispersal Communication (EHDC) systems and Aircrew Alerting Communications Electromagnetic Pulse (AACE) systems. The total cost of the Global Aircrew Strategic Network Terminal Increment 2 Block 1 Middle Tier of Acquisition (MTA) effort was 141.079M, including Research Development Test & Evaluation, Air Force (RDT&E, AF) and procurement of prototype units. Global ASNT Inc 2 Block 1 transitioned to a Major Capability Acquisition (MCA) FY26 Q2. Global ASNT Increment 2 Block 2 provides High Frequency (HF) Beyond Line of Sight (BLOS) capabilities for fixed ground and transportable units to communicate with bomber and tanker aircraft, and emerging NC3 Platforms out of range of Ultra High Frequency (UHF) Line of Sight (LOS). RDT&E funding for this exhibit is contained in PE 0303131F. Milestone/Development Status Global ASNT Increment 2 Block 1 Production and Deployment (P&D) requirements include procurement, installation, and check-out of 20 non-High-Altitude Electromagnetic Pulse (HEMP) systems, 70 HEMPhardened systems, and 20 HEMP Mod Kits to retrofit the non-HEMP systems; also included are hosting operator and maintainer training courses, site surveys in advance of installations, initial spares, Interim Contractor Support (ICS), Contractor Logistics Support (CLS), Program Office Support, Government Test Support, Other Government Costs (OGC) and initial Security Classification Guide (SCG) implementation activities. Global ASNT Increment 2 Block 2 procurement activities begin in FY2031. LI 834210 - Minimum Essential Emergency Comm N Air Force UNCLASSIFIED Page 25 of 29 P-1 Line #36 Volume 1 - 409 === page 446 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 834210 / Minimum Essential Emergency Comm N Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : B MDAP/MAIS Code: Models of Systems Affected: GASNTi2 Related RDT&E PEs: 0303131F Modification Type: Capability Improvement Prior Years Financial Plan Modification Number / Title: 4 / GASNTi2 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) RDT&E PE # 0303131F - / 28.023 - / 11.423 - / 7.960 - / 11.300 - / - - / 11.300 - / 10.800 - / 4.400 - / - - / - - / - - / 73.906 Procurement Modification Item 1 of 2: HEMP A Kits Recurring HEMP:INSTALL KITS Group A (Active) Subtotal: Recurring - / - - / - - / - - / 13.870 - / - - / 13.870 - / 14.686 - / 9.116 - / 11.897 - / 20.174 - / - - / 69.743 - / - - / - - / - - / 13.870 - / - - / 13.870 - / 14.686 - / 9.116 - / 11.897 - / 20.174 - / - - / 69.743 - / - - / - - / - 20 / 48.714 - / - 20 / 48.714 14 / 21.054 - / - 90 / 168.371 - / - - / - - / - - / 48.714 - / - - / 48.714 - / 39.929 - / 23.997 - / 34.677 - / 21.054 - / - - / 168.371 - / - - / - - / - - / 62.584 - / - - / 62.584 - / 54.615 - / 33.113 - / 46.574 - / 41.228 - / - - / 238.114 B Kits Recurring HEMP:EQUIPMENT Group B (Active) Subtotal: Recurring Subtotal: HEMP 18 / 39.929 16 / 23.997 22 / 34.677 Modification Item 2 of 2: Non-HEMP B Kits Recurring Non-HEMP:EQUIPMENT Group B (Active) Subtotal: Recurring Subtotal: Non-HEMP Subtotal: Procurement, All Modification Items 20 / 31.855 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 20 / 31.855 - / 31.855 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - - / 31.855 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - - / 31.855 - / - - / - / 62.584 - / - / 41.228 - / - - / 62.584 - / 54.615 - / 33.113 - / 46.574 - - / 31.855 / 31.855 / 269.969 - Support (All Modification Items) Change Orders - / 0.094 - / 0.199 / 10.306 - / 5.674 - / - - / 5.674 - / 2.514 - / 1.234 - / 4.946 A&AS - / 3.275 - / 3.612 - / 5.631 - / 7.430 - / - - / 7.430 - / 7.803 - / 8.250 - / 8.440 FFRDC - / 1.480 - / 1.010 - / 2.315 - / 4.262 - / - - / 4.262 - / 2.871 - / 2.937 - / 2.270 / - - / 4.228 - / - - / 4.228 - / 5.135 - / 5.362 - / 5.301 / 10.395 - / 5.944 Depot Activation - / - - - / - - / 2.344 - / - - / 27.311 / 12.336 - / - - / 56.777 / 4.194 - / - - / 21.339 - / - - / - - / 20.026 - / - - / - - / 44.760 - - ICS Labor - / 2.543 - / 7.653 - / 5.549 - / 5.673 - / - - / 5.673 - / 7.003 PMA - Contractor Services - / 1.514 - / 1.623 - / 0.963 - / 2.213 - / - - / 2.213 - / 2.745 - / 2.423 - / 2.116 - / 0.812 - / - / - - / 1.218 - / - - / - - / - - / 1.022 - / 1.516 - / 1.760 - / 2.830 - / - / 1.516 - / 7.260 - / - - / - - / - / - - / 1.169 - / - - / - - / - - / - / 5.185 - / - / 29.480 - / - / 28.870 - / - Type I Training - Prime Contractor Site Surveys - Prime Contractor ODCs Subtotal: Support - / - - / 1.815 - / 0.321 / 11.042 - / 0.174 / 15.787 - / 1.835 / 35.077 - - / 29.480 - - - / - - / 1.211 / 30.304 - / - - / 1.763 / 33.880 - / 2.754 / 33.531 - / 14.409 - - / 8.346 / 11.760 / 13.243 / 217.971 Installation LI 834210 - Minimum Essential Emergency Comm N Air Force UNCLASSIFIED Page 26 of 29 P-1 Line #36 Volume 1 - 410 === page 447 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 834210 / Minimum Essential Emergency Comm N Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : B MDAP/MAIS Code: Models of Systems Affected: GASNTi2 Related RDT&E PEs: 0303131F Modification Type: Capability Improvement Prior Years Financial Plan Modification Number / Title: 4 / GASNTi2 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Modification Item 1 of 2: HEMP - / - - / - / - - / - - / - - / - Modification Item 2 of 2: Non-HEMP - / - - / - 20 / 3.640 - / - - / - - / - Subtotal: Installation - / - - / - 20 / 3.640 - / - - / - - / - 12 / 6.755 20 / 9.807 15.787 38.717 92.064 91.674 76.800 - 12 / 6.755 - / - 20 / 9.807 - / - 29 / 8.995 - / - / - - / - 20 / 3.640 29 / 8.995 29 / 8.880 - / - 110 / 38.077 89.100 78.978 - 526.017 - / - 29 / 8.880 - 90 / 34.437 Total Total Cost (Procurement + Support + Installation) 42.897 LI 834210 - Minimum Essential Emergency Comm N Air Force 92.064 0.000 UNCLASSIFIED Page 27 of 29 P-1 Line #36 Volume 1 - 411 === page 448 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 834210 / Minimum Essential Emergency Comm N Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: 4 / GASNTi2 MDAP/MAIS Code: Modification Item 1 of 2: HEMP Manufacturer Information Manufacturer Name: General Dynamic Mission Systems Manufacturer Location: Taunton, MA Administrative Leadtime (in Months): 1 Dates Production Leadtime (in Months): 8 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2026 Feb 2028 Jan 2029 Nov 2029 Nov 2030 Delivery Dates Aug 2027 Oct 2028 Sep 2029 Jul 2030 Jul 2031 Installation Information Method of Implementation: Contractor Facility Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - 8 / 3.923 - / - - / - - / - 20 / 10.678 FY 2028 - / - - / - - / - - / - - / - - / - - / - 6 / 1.861 - / - - / - 18 / 7.745 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - 16 / 4.963 - / - - / - 16 / 4.963 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 7 / 2.171 15 / 4.593 - / - 22 / 6.764 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 14 / 4.287 - / - 14 / 4.287 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - / - - / - Total - / - - / - - / - - / - - / - - / - 29 / 8.880 - / - Installation Cost 12 / 6.755 12 / 5.884 12 / 6.755 20 / 9.807 - 29 / 8.995 - / - 90 / 34.437 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 0 - - - - - - - - - - - - - - 6 6 6 2 6 6 6 6 8 9 9 6 5 9 0 90 Out 0 - - - - - - - - - - - - - - 6 6 6 2 3 6 6 6 6 7 9 9 9 9 0 90 LI 834210 - Minimum Essential Emergency Comm N Air Force UNCLASSIFIED Page 28 of 29 P-1 Line #36 Volume 1 - 412 === page 449 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 834210 / Minimum Essential Emergency Comm N Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: 4 / GASNTi2 MDAP/MAIS Code: Modification Item 2 of 2: Non-HEMP Manufacturer Information Manufacturer Name: General Dynamic Mission Systems Manufacturer Location: Taunton, MA Administrative Leadtime (in Months): 1 Dates Production Leadtime (in Months): 25 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation: Contractor Facility Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - 20 / 3.640 - / - - / - - / - - / - - / - - / - - / - - / - Installation Cost 20 / 3.640 20 / 3.640 20 / 3.640 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 0 - - - - - 6 7 7 - - - - - - - - - - - - - - - - - - - - 0 20 Out 0 - - - - - 6 7 7 - - - - - - - - - - - - - - - - - - - - 0 20 LI 834210 - Minimum Essential Emergency Comm N Air Force UNCLASSIFIED Page 29 of 29 P-1 Line #36 Volume 1 - 413 === page 450 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 414 === page 451 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834240 / Wide Area Surveillance (WAS) Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0604445F Line Item MDAP/MAIS Code: 519 Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Procurement Quantity (Units in Each) - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 13.945 29.617 17.000 - 17.000 17.931 17.027 17.337 17.684 - Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 13.945 29.617 17.000 - 17.000 17.931 17.027 17.337 17.684 - Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 13.945 29.617 17.000 - 17.000 17.931 17.027 17.337 17.684 - Total 130.541 130.541 130.541 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The Wide Area Surveillance (WAS) program provides homeland defense sensors to North American Aerospace Defense Command/US Northern Command (NORAD/USNORTHCOM) for the National Capital Region (NCR). WAS consists of three advanced sensor systems, the Stateside Affordable Radar System (STARS), Scorpion, and Affordable Long Range Persistent Systems (ALPS). Based upon existing technological capabilities, WAS detects/tracks low, slow and other asymmetrical threats in the airspace and meets the user needs of sensing stressing airborne targets in complex environments with affordable sensors. The sensor outputs are incorporated into the Battle Control Systems-Fixed (BCS-F) air picture and utilized as the NORAD/USNORTHCOM Command and Control (C2) air surveillance system of record. The WAS strategy is an acquisition approach for full capability to produce and field highly capable and sustainable advanced sensors in the NCR. In FY27, the Air Force plans to award WAS Production Contract efforts for Scorpion or ALPS, as well as perform a technical refresh of fielded sites. In FY27, the Air Force continues to procure replenishment spares and repair parts. Some aspects of the WAS program are classified and information will be provided on a need-to-know basis. Funding for this exhibit is contained in PE 0604445F, Wide Area Surveillance. LI 834240 - Wide Area Surveillance (WAS) Air Force UNCLASSIFIED Page 1 of 7 P-1 Line #37 Volume 1 - 415 === page 452 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834240 / Wide Area Surveillance (WAS) Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0604445F Line Item MDAP/MAIS Code: 519 Exhibits Schedule Exhibit Type Title* P-5 Wide Area Surveillance P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 13.945 - / 29.617 - / 17.000 - / - - / 17.000 - / - - / 13.945 - / 29.617 - / 17.000 - / - - / 17.000 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY27 activities will include but are not limited to the following: Fielding operational sensors; addressing emerging sensor capabilities; updating system infrastructure such as a system integrated lab and system health and monitoring centralized data processing capability to support operations for NORAD/NORTHCOM; supporting technical refresh of fielded sites; upgrading hardware and software to seamlessly integrate new and emerging sensors, data, and technologies; procuring end items and spares that do not qualify for Centralized Asset Management (CAM) funding; funding program and direct mission support providing management, engineering, cost and technical support for the program office; supporting potential diminishing manufacturing sources, material shortages, obsolescence solutions, sparing, and recapitalization; and procuring key components of each site that require significant lead time items. LI 834240 - Wide Area Surveillance (WAS) Air Force UNCLASSIFIED Page 2 of 7 P-1 Line #37 Volume 1 - 416 === page 453 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834240 / Wide Area Surveillance (WAS) Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Wide Area Surveillance MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 13.945 29.617 17.000 - 17.000 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 13.945 29.617 17.000 - 17.000 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 13.945 29.617 17.000 - 17.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.000 0.000 0.000 - 0.000 Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Wide Area Surveillance Cost Recurring Cost (†) (1) - - - - - - 3.611 25.278 3.687 11.060 - - - 3.687 Subtotal: Recurring Cost - - - - - - - - 25.278 - - 11.060 - - - - - 11.060 Prime 7 3 3 11.060 Non Recurring Cost Prime Tech Refresh - - - - - 12.414 - - 2.661 - - 2.945 - - - - - 2.945 Subtotal: Non Recurring Cost - - - - - 12.414 - - 2.661 - - 2.945 - - - - - 2.945 Subtotal: Hardware - Wide Area Surveillance Cost - - - - - 12.414 - - 27.939 - - 14.005 - - - - - 14.005 DMS Support - - - - - 0.409 - - 0.862 - - 2.377 - - - - - 2.377 Program Support Costs - - - - - 1.122 - - 0.816 - - 0.618 - - - - - 0.618 Subtotal: Support - Wide Area Surveillance Cost - - - - - 1.531 - - 1.678 - - 2.995 - - - - - 2.995 Gross/Weapon System Cost - - - - - 13.945 - - 29.617 - - 17.000 - - - - - 17.000 Support - Wide Area Surveillance Cost (†) indicates the presence of a P-5a Footnotes: (1) DMS efforts include Production site lease payments, network support, site security guards and some facility support tasks LI 834240 - Wide Area Surveillance (WAS) Air Force UNCLASSIFIED Page 3 of 7 P-1 Line #37 Volume 1 - 417 === page 454 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (†) O O C P-1 Line Item Number / Title: 834240 / Wide Area Surveillance (WAS) FY Contractor and Location Method/Type or Funding Vehicle Item Number / Title [DODIC]: Wide Area Surveillance Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) Prime (†) 2026 Leidos / Huntsville, AL Various AFLCMC/C3BM May 2026 May 2027 7 3.611 Y Prime (†) 2027 Leidos / Huntsville, AL Various AFLCMC/C3BM Nov 2026 Nov 2027 3 3.687 Y RFP Issue Date indicates the presence of a P-21 LI 834240 - Wide Area Surveillance (WAS) Air Force UNCLASSIFIED Page 4 of 7 P-1 Line #37 Volume 1 - 418 === page 455 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834240 / Wide Area Surveillance (WAS) Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # PROC QTY Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT FY SERVICE 1 2026 AF 7 0 7 1 2027 AF 3 0 3 Prime Item Number / Title [DODIC]: Wide Area Surveillance Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) A O C T LI 834240 - Wide Area Surveillance (WAS) Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 5 of 7 S E P O C T - - - - - - A - - - - - - N O V D E C J A N F E B P-1 Line #37 M A R A P R 2 2 M A Y 2 J U N 1 J U L 0 A U G S E P Volume 1 - 419 3 === page 456 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834240 / Wide Area Surveillance (WAS) Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # PROC QTY Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT FY SERVICE 1 2026 AF 7 7 0 1 2027 AF 3 0 3 Prime Item Number / Title [DODIC]: Wide Area Surveillance Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) 0 O C T LI 834240 - Wide Area Surveillance (WAS) Air Force 2 N O V 1 D E C 0 J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 7 S E P O C T N O V D E C J A N F E B P-1 Line #37 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 420 === page 457 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834240 / Wide Area Surveillance (WAS) Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: Wide Area Surveillance Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Leidos - Huntsville, AL 3 3 3 ALT Prior to Oct 1 ALT After Oct 1 1 Reorder Manufacturing PLT 2 12 Total After Oct 1 ALT Prior to Oct 1 14 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 834240 - Wide Area Surveillance (WAS) Air Force UNCLASSIFIED Page 7 of 7 P-1 Line #37 Volume 1 - 421 0 === page 458 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 422 === page 459 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834320 / C3 Countermeasures Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 77.937 90.347 - - 77.937 90.347 - - 77.937 90.347 116.410 116.410 116.410 163.127 - - 163.127 - - 163.127 - 163.127 163.127 163.127 156.700 156.700 156.700 155.348 155.348 155.348 170.202 170.202 170.202 To FY 2031 Complete 153.511 153.511 153.511 Total - 1,083.582 - 1,083.582 - 1,083.582 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: PE 0208087F Distributed Cyber Warfare Operations (DCWO) Provides for the innovation, test, support, and deployment of cyberspace solutions in the form of materiel and non-materiel capabilities in support of USAF offensive cyberspace operations (OCO) to include but not limited to USAF OCO units, Combatant Commands (COCOMs), and other authorized agencies. Funding procures specialized hardware and software necessary for associated infrastructure and capability deployment across multiple OCO mission areas. Funding for this exhibit contained in PE 0208087F. PE 0208088F AF Defensive Cyberspace Operations (DCO) AF DCO procures commercial off the shelf (COTS) hardware for the Integrated Defensive Cyberspace System (IDCS). IDCS hardware is configured as mobile or fixed form factors. Mobile hardware is used to equip Mission Defense Teams (MDTs) and Air Force retained Cyber Protection Teams (CPTs). Fixed hardware is deployed to all 188 Department of the Air Force (DAF) bases to collect network logs and serve as critical nodes in the IDCS architecture providing situational awareness of the key cyberspace terrain essential to the projection of Air Power. Operational users of IDCS include USAF operational units -- predominantly Sixteenth Air Force (AFCYBER), 688th Cyber Security Service Provider (CSSP), and 67th Cyber Wing, Air Force CPTs, MDTs, and network defenders. The capabilities provided will process data from and protect USAF networks and systems at multiple classification levels. Funding also provides IDCS software components essential to protecting Department of War (DoW) network enclaves, mission/ weapon systems and control systems against unauthorized intrusion, exploitation, corruption, and/or destruction. Continued procurement and deployment of IDCS hardware and software will help meet the urgent need to deploy modernized, interconnected cyber defenses to deter near-peer aggression. AF DCO provides the DAF increased mission assurance through enhanced cyber defense and situational awareness over the systems and assets required to enable the movement of forces and employment of US Air Power. Funding for this exhibit contained in PE 0208088F. PE 0804762F Cyberspace Training and Ranges Cyberspace Training and Ranges provides solutions in the form of material and non-material cyberspace training platforms, threat representative networks, mission relevant cyber terrain, and multi-domain architecture to support training and exercises for DoW and AF cyber operations. This includes initial/mission qualification training (IQT/MQT), mission rehearsals, and exercises to support USAF Offensive and Defensive Cyber Operations and Network Operations units, Combatant Commands, and other authorized agencies. Funding for this exhibit contained in PE 0804762F. PE 0303166F Joint Information Operations Range (JIOR) LI 834320 - C3 Countermeasures Air Force UNCLASSIFIED Page 1 of 25 P-1 Line #38 Volume 1 - 423 === page 460 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834320 / C3 Countermeasures Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A The Joint Information Operations Range (JIOR) provides the Department of War (DoW) with a closed network that forms a global live-fire information operations range complex. JIOR uses encrypted tunneling over existing transport networks to conduct mission rehearsal, training, testing, concept development, and experimentation in support of Information Operations (IO), Electronic Warfare (EW), Offensive Cyber Operations (OCO), Defensive Cyber Operations (DCO), Spectrum Warfare, Space Operations, and Special Operations Forces mission areas in a realistic threat representative environment. JIOR provides the capability to train and certify Cyber Mission Forces (CMFs) on the full spectrum of cyber weapons/capabilities without risk of observation or fratricide. JIOR integrates available cyberspace ranges and capability providers with the training/test audience providing access to low density/high demand test and training resources including critical infrastructure, cyber targets, internet traffic, and opposing forces. JIOR supports Presidential policy and Chairman of the Joint Chiefs of Staff (CJCS) mandates for training, certification, and recertification of 6000+ cyber mission forces and DoW/Interagency cyber vulnerability assessments. Combatant Commands, Services, and Agencies (C/S/As) conduct hundreds of mission rehearsal, training, testing, and experimentation events on JIOR annually. Funding for this exhibit contained in PE 0303166F. PE 0208076F Mission Defense Teams (MDT) MDT program increases resiliency and survivability of Air Force Major Weapon systems and infrastructure critical to the execution of AF core missions utilizing Core functions conducted by Mission Assurance Cyber Coordination Element (MACCE), Functional communities, and 16AF support with the objectives to break the adversaries kill chain, provide decision advantage for the warfighters, and increase military lethality. The MACCE are essential for maintaining high-end readiness and mission assurance ensuring the Air Force's ability to de-fend its weapon systems and infrastructure against evolving threats. Funding for this exhibit contained in PE 0208076F. LI 834320 - C3 Countermeasures Air Force UNCLASSIFIED Page 2 of 25 P-1 Line #38 Volume 1 - 424 === page 461 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834320 / C3 Countermeasures Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD P-5 Distributed Cyber Warfare Operations P-5a, P-21 A P-5 AF Defensive Cyberspace Operations P-5a, P-21 A P-5 Cyberspace Training and Ranges P-5a, P-21 A P-5 Joint Information Operations Range P-5 Mission Defense Teams P-40 Total Gross/Weapon System Cost P-5a, P-21 MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 22.478 - / 30.035 - / 51.583 - / - - / 51.583 / 77.937 - / 36.473 - / 45.055 - / 68.367 - / - - / 68.367 - / - - / 30.143 - / 31.059 - / 31.285 - / - - / 31.285 A - / - - / 1.253 - / 1.276 - / 1.330 - / - - / 1.330 A - / - - / 0.000 - / 8.985 - / 10.562 - / - - / 10.562 / 77.937 - / 90.347 / 116.410 - / 163.127 - / - - / 163.127 - - - *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: PE 0208087F Distributed Cyber Warfare Operations (DCWO) Funding in FY2027 will continue investments in additional hardware, software, and recapitalization efforts for various systems. These efforts include procuring equipment supporting the USAF Urgent Operational Need and system deployment to the 179th Cyber Wing in Mansfield, OH to support Cyber Enabled Air Superiority (CEAS). The FY2026 to FY2027 increase of $21.548 Million is due to the additional funding to support the USAF Urgent Operational Need. PE 0208088F AF Defensive Cyberspace Operations (DCO) Funding in FY2027 will support USAF networks and systems at multiple classification levels by providing equipment in mobile and fixed configurations to protect and defend AF networks against attacks. Funding provides both hardware and software essential to protecting DoW network enclaves weapon, control, and associated computer systems, software applications, and sensitive operational information against unauthorized intrusion, corruption, and/or destruction. All hardware, software, fielding, integration, documentation, information assurance, and engineering/program management costs required for deployment are funded in this line. The FY2026 to FY2027 increase of $23.312 Million is due to additional sensor and cyber defense capabilities enabling cyber mission terrain mapping and continued operations during scenarios where network connectivity is Denied, Degraded, Intermittent, and/or Low-Bandwidth operations. PE 0804762F Cyberspace Training and Ranges Funding in FY2027 will procure student mission training systems (hardware, software, infrastructure, and facility modifications) supporting Information Warfare and Cyber Operations training needs. FY2027 funding continues investment to procure additional hardware and software to support training capacity increases to the AF Cyber Operations Forces Training Enterprise to meet its required pipeline of 1000 to approximately 3500 students/year. Includes essential training infrastructure consisting of cabling, switches, servers, storage, virtualization, and software to upgrade and maintain 15 Cyber classrooms. PE 0303116F Joint Information Operations Range (JIOR) Funding in FY2027 will support equipment and software modernization to enable the JIOR to extend service to 20 new sites while continuing support to the over 250 existing JIOR access points. Equipment will be procured annually for upgrades and new sites. LI 834320 - C3 Countermeasures Air Force UNCLASSIFIED Page 3 of 25 P-1 Line #38 Volume 1 - 425 === page 462 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834320 / C3 Countermeasures Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A PE 0208076F Mission Defense Teams (MDT) Funding in FY2027 will support capabilities that will process data from and protect USAF networks and systems at multiple classification levels. Funding also provides IDCS hardware components essential to protecting DoW network enclaves, mission/air gap weapon systems and control systems against unauthorized intrusion, exploitation, corruption, and/or destruction. Continued procurement and deployment of IDCS hardware and software will help meet the urgent need to deploy modernized, interconnected cyber defenses to deter near-peer aggression. LI 834320 - C3 Countermeasures Air Force UNCLASSIFIED Page 4 of 25 P-1 Line #38 Volume 1 - 426 === page 463 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834320 / C3 Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Distributed Cyber Warfare Operations MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 22.478 30.035 51.583 - 51.583 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 22.478 30.035 51.583 - 51.583 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 22.478 30.035 51.583 - 51.583 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Software - Distributed Cyber Warfare Operations Cost Recurring Cost Program Support Costs (PSC) Contractor Services - - - 1.183 Subtotal: Recurring Cost - - - - - - - 21.295 Subtotal: Non Recurring Cost - - - - Subtotal: Software Distributed Cyber Warfare Operations Cost - - - Gross/Weapon System Cost - - - 1 1.183 1.580 1.183 - 21.295 28.455 - 21.295 - - - 22.478 - - 22.478 - 1 1.580 2.714 1.580 - 28.455 48.869 - 28.455 - - - 30.035 - - 30.035 - 1 2.714 - - - 2.714 2.714 - - - - 48.869 - - - 48.869 - 48.869 - - - - - 48.869 - - 51.583 - - - - - 51.583 - - 51.583 - - - - - 51.583 - 1 - 2.714 2.714 Non Recurring Cost Distributed Cyber Warfare Operations (†) Cost 1 1 1 1 48.869 Remarks: DCWO system specifics are classified and will be provided on a need-to-know basis. (†) indicates the presence of a P-5a LI 834320 - C3 Countermeasures Air Force UNCLASSIFIED Page 5 of 25 P-1 Line #38 Volume 1 - 427 === page 464 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements O O C Distributed Cyber Warfare Operations Cost (†) Distributed Cyber Warfare Operations Cost (†) Distributed Cyber Warfare Operations Cost (†) (†) P-1 Line Item Number / Title: 834320 / C3 Countermeasures Item Number / Title [DODIC]: Distributed Cyber Warfare Operations FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) 2025 Various / Various Various AFLCMC/HN Nov 2024 Dec 2024 1 21.295 Y Feb 2024 2026 Various / Various Various AFLCMC/HN Nov 2025 Dec 2025 1 28.455 Y Feb 2025 2027 Various / Various Various AFLCMC/HN Nov 2026 Dec 2026 1 48.869 Y Feb 2026 Qty (Each) RFP Issue Date indicates the presence of a P-21 Remarks: The prior year quantities of one (1) listed for Distributed Cyber Warfare Operations (DCWO) represent the sum package of various information technology hardware software, and services required to support DCWO weapon system capabilities in a given year. The composition of procured items will vary from year-to-year and site-to-site to deliver DCWO capabilities. Multiple competitive contracts awarded procuring hardware in support of development in PE 0208087F, Distributed Cyber Warfare Operations LI 834320 - C3 Countermeasures Air Force UNCLASSIFIED Page 6 of 25 P-1 Line #38 Volume 1 - 428 === page 465 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834320 / C3 Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Distributed Cyber Warfare Operations Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Fiscal Year 2026 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Distributed Cyber Warfare Operations Cost 1 2025 AF 1 0 1 1 2026 AF 1 0 1 1 2027 AF 1 0 1 A - 0 A - 1 0 1 O C T LI 834320 - C3 Countermeasures Air Force 1 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #38 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 429 === page 466 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834320 / C3 Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Distributed Cyber Warfare Operations Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Distributed Cyber Warfare Operations Cost 1 2025 AF 1 1 0 1 2026 AF 1 1 0 1 2027 AF 1 0 1 0 0 A O C T LI 834320 - C3 Countermeasures Air Force N O V 1 D E C 0 J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #38 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 430 === page 467 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834320 / C3 Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Item Number / Title [DODIC]: Distributed Cyber Warfare Operations Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 1 1 1 Various - Various ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 1 Manufacturing PLT 2 Total After Oct 1 1 Remarks: Note: MSR, ECON, and MAX are Not Applicable. Items procured are Commercial Off The Shelf (COTS). "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 834320 - C3 Countermeasures Air Force UNCLASSIFIED Page 9 of 25 P-1 Line #38 Volume 1 - 431 3 === page 468 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834320 / C3 Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: AF Defensive Cyberspace Operations MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 77.937 36.473 45.055 68.367 - 68.367 - - - - - - 77.937 36.473 45.055 68.367 - 68.367 - - - - - - 77.937 36.473 45.055 68.367 - 68.367 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - AF Defensive Cyberspace Operations Cost Recurring Cost 1. Integrated DCS (†) Mobile Kits 2. Integrated DCS Fixed Systems (†) Subtotal: Recurring Cost 23.050 1 23.050 16.491 1 16.491 11.316 1 11.316 36.154 1 36.154 - - - 36.154 1 36.154 54.887 1 54.887 17.448 1 17.448 28.759 1 28.759 25.060 1 25.060 - - - 25.060 1 25.060 - - 77.937 - - 33.939 - - 40.075 - - 61.214 - - - - - 61.214 - - 77.937 - - 33.939 - - 40.075 - - 61.214 - - - - - 61.214 - - - 2.534 2.534 4.980 4.980 7.153 7.153 - - - 7.153 Subtotal: Support - AF Defensive Cyberspace Operations Cost - - - - - 2.534 - - 4.980 - - 7.153 - - - - - 7.153 Gross/Weapon System Cost - - 77.937 - - 36.473 - - 45.055 - - 68.367 - - - - - 68.367 Subtotal: Hardware - AF Defensive Cyberspace Operations Cost Support - AF Defensive Cyberspace Operations Cost Program Support Costs (PSC) Contractor Services 1 1 1 1 7.153 Remarks: Recurring Cost Element 1 Funding provides for continued fielding of the mobile configuration of the Integrated Defensive Cyberspace System including both hardware and associated SW to convert mobile kits into fully capable nodes of the Integrated Defensive Cyberspace System. This conversion builds on a modular approach, allowing mobile kits to be tailored to the data throughput, speed, and classification requirements of each specific LI 834320 - C3 Countermeasures Air Force UNCLASSIFIED Page 10 of 25 P-1 Line #38 Volume 1 - 432 === page 469 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 P-1 Line Item Number / Title: 834320 / C3 Countermeasures ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: AF Defensive Cyberspace Operations MDAP/MAIS Code: mission. FY2027 funding provides for initial procurement of the US Cyber Command Joint Cyber Hunt Kit. Multiple mobile kits are procured and configured in a given Fiscal Year, providing the single capability of IDCS. Recurring Cost Element 2 Funding provides for the continued deployment of modernized fixed network log collectors to 188 Air Force bases worldwide. Log collectors will be built from a common hardware basis allowing for the expansion of capabilities from log collectors to fully capable nodes of the Integrated Defensive Cyberspace System according to an operationally driven priority list beginning with locations in the Pacific Theater to deter near-peer aggression. Hardware includes servers, switches and associated lightweight sensors to be connected to end points unique to each AF Base to provide Cybersecurity and Situational Awareness of the entire cyber landscape. Sensor deployment will be tailored to operational function of the base, to include airfields, control centers, power, water and other supporting systems, as appropriate. Refinement of a base-by-base deployment plan began in FY23 and will be incrementally refined throughout the deployment process. Deployment will be conducted in collaboration with local commanders, OSI, and other stakeholders. DCO Cyber weapon systems are centrally managed. (†) indicates the presence of a P-5a LI 834320 - C3 Countermeasures Air Force UNCLASSIFIED Page 11 of 25 P-1 Line #38 Volume 1 - 433 === page 470 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 O O C Cost Elements 1. Integrated DCS - Mobile Kits FY Contractor and Location Method/Type or Funding Vehicle Item Number / Title [DODIC]: AF Defensive Cyberspace Operations Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) 2024 Dell / Round Rock, TX PO AFLCMC/HN Mar 2024 May 2024 1 23.050 Y 1. Integrated DCS - Mobile Kits (†) 2025 Dell / Round Rock, TX PO AFLCMC/HN Mar 2025 May 2025 1 16.491 Y 1. Integrated DCS - Mobile Kits (†) 2026 Dell / Round Rock, TX PO AFLCMC/HN Mar 2026 May 2026 1 11.316 Y 1. Integrated DCS - Mobile Kits (†) 2027 Dell / Round Rock, TX PO AFLCMC/HN Mar 2027 May 2027 1 36.154 Y 2024 Dell / Round Rock, TX PO AFLCMC/HN Mar 2024 May 2024 1 54.887 Y 2025 Dell / Round Rock, TX PO AFLCMC/HN Mar 2025 May 2025 1 17.448 Y 2026 Dell / Round Rock, TX PO AFLCMC/HN Mar 2026 May 2026 1 28.759 Y 2027 Dell / Round Rock, TX PO AFLCMC/HN Mar 2027 May 2027 1 25.060 Y 2. Integrated DCS - Fixed Systems 2. Integrated DCS - Fixed Systems (†) 2. Integrated DCS - Fixed Systems (†) 2. Integrated DCS - Fixed Systems (†) P-1 Line Item Number / Title: 834320 / C3 Countermeasures (†) RFP Issue Date Jan 2024 Jan 2024 indicates the presence of a P-21 LI 834320 - C3 Countermeasures Air Force UNCLASSIFIED Page 12 of 25 P-1 Line #38 Volume 1 - 434 === page 471 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834320 / C3 Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: AF Defensive Cyberspace Operations Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Fiscal Year 2025 Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1. Integrated DCS - Mobile Kits 1 2025 AF 1 0 1 1 2026 AF 1 0 1 A - - 1 0 1 1 2027 AF 1 0 1 1 2. Integrated DCS - Fixed Systems 2 2025 AF 1 0 1 2 2026 AF 1 0 1 2 2027 AF 1 0 1 A - 1 0 1 1 O C T LI 834320 - C3 Countermeasures Air Force - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #38 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 435 === page 472 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834320 / C3 Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: AF Defensive Cyberspace Operations Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Fiscal Year 2027 Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1. Integrated DCS - Mobile Kits 1 2025 AF 1 1 0 1 2026 AF 1 0 1 1 2027 AF 1 0 1 0 A - - 1 0 A - - 1 0 2. Integrated DCS - Fixed Systems 2 2025 AF 1 1 0 2 2026 AF 1 0 1 2 2027 AF 1 0 1 0 A - 1 0 A - O C T LI 834320 - C3 Countermeasures Air Force - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #38 M A R A P R 1 M A Y 0 J U N J U L A U G S E P Volume 1 - 436 === page 473 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834320 / C3 Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Item Number / Title [DODIC]: AF Defensive Cyberspace Operations Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Dell - Round Rock, TX 1 1 1 0 0 0 0 1 6 2 8 2 Dell - Round Rock, TX 1 1 1 0 0 0 0 1 6 2 8 Remarks: Note: MSR, ECON, and MAX are Not Applicable. Items procured are Commercial Off The Shelf (COTS). "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 834320 - C3 Countermeasures Air Force UNCLASSIFIED Page 15 of 25 P-1 Line #38 Volume 1 - 437 === page 474 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834320 / C3 Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Cyberspace Training and Ranges MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 30.143 31.059 31.285 - 31.285 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 30.143 31.059 31.285 - 31.285 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 30.143 31.059 31.285 - 31.285 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Cyberspace Training Cost Non Recurring Cost Cyber Multi-Domain Architecture Cyber Test and Training Range - - - 1.680 1 1.680 1.760 1 1.760 8.372 1 8.372 - - - 8.372 1 8.372 (†) - - - 16.637 1 16.637 18.174 1 18.174 16.737 1 16.737 - - - 16.737 1 16.737 (†) 1 11.826 11.125 1 11.125 6.176 1 6.176 - - - 6.176 1 6.176 Cyber IQT-MQT - - - 11.826 Subtotal: Non Recurring Cost - - - - - 30.143 - - 31.059 - - 31.285 - - - - - 31.285 Subtotal: Hardware Cyberspace Training Cost - - - - - 30.143 - - 31.059 - - 31.285 - - - - - 31.285 Gross/Weapon System Cost - - - - - 30.143 - - 31.059 - - 31.285 - - - - - 31.285 (†) indicates the presence of a P-5a LI 834320 - C3 Countermeasures Air Force UNCLASSIFIED Page 16 of 25 P-1 Line #38 Volume 1 - 438 === page 475 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 FY Contractor and Location Cyber Test and Training Range 2025 Various / Various TBD JBSA-Lackland Feb 2025 Mar 2025 1 16.637 Y Cyber Test and Training Range 2026 Various / Various TBD JBSA-Lackland Feb 2026 Mar 2026 1 18.174 Y Cyber Test and Training Range 2027 Various / Various TBD JBSA-Lackland Feb 2027 Mar 2027 1 16.737 Y (†) 2025 Various / Various TBD JBSA-Lackland Feb 2025 Mar 2025 1 11.826 Y (†) 2026 Various / Various TBD JBSA-Lackland Feb 2026 Mar 2026 1 11.125 Y (†) 2027 Various / Various TBD JBSA-Lackland Feb 2027 Mar 2027 1 6.176 Y Cyber IQT-MQT Cyber IQT-MQT Cyber IQT-MQT (†) Item Number / Title [DODIC]: Cyberspace Training and Ranges Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 834320 / C3 Countermeasures Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date indicates the presence of a P-21 Remarks: Quantities listed as one (1) for Cyberspace Training represent the sum package of various information technology hardware and software required to support the Cyberspace Training capabilities in a given year. The composition of procured items will vary from year-to-year and site-to-site to achieve the Cyberspace Training requirements. LI 834320 - C3 Countermeasures Air Force UNCLASSIFIED Page 17 of 25 P-1 Line #38 Volume 1 - 439 === page 476 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834320 / C3 Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Cyberspace Training and Ranges Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Fiscal Year 2026 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Cyber IQT-MQT 1 2025 AF 1 0 1 1 2026 AF 1 0 1 1 2027 AF 1 0 1 A - 0 A - 1 0 1 O C T LI 834320 - C3 Countermeasures Air Force 1 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 18 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #38 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 440 === page 477 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834320 / C3 Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Cyberspace Training and Ranges Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Cyber IQT-MQT 1 2025 AF 1 1 0 1 2026 AF 1 1 0 1 2027 AF 1 0 1 0 0 A O C T LI 834320 - C3 Countermeasures Air Force N O V D E C J A N F E B 1 M A R 0 A P R M A Y J U N J U L A U G UNCLASSIFIED Page 19 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #38 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 441 === page 478 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834320 / C3 Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Item Number / Title [DODIC]: Cyberspace Training and Ranges Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 1 1 1 Various - Various ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 1 Manufacturing PLT 5 Total After Oct 1 1 Remarks: Note: MSR, ECON, Max are not applicable. Items procured are Commercial Off The Shelf (COTS) items. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 834320 - C3 Countermeasures Air Force UNCLASSIFIED Page 20 of 25 P-1 Line #38 Volume 1 - 442 6 === page 479 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834320 / C3 Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Joint Information Operations Range MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 1.253 1.276 1.330 - 1.330 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 1.253 1.276 1.330 - 1.330 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 1.253 1.276 1.330 - 1.330 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Support to Information Operations (IO) Capabilities Cost Recurring Cost Enterprise Network Modernization - - - 1.253 1.253 1.276 1.276 1.330 1.330 - - - 1.330 Subtotal: Recurring Cost - - - - - 1.253 - - 1.276 - - 1.330 - - - - - 1.330 Subtotal: Hardware Support to Information Operations (IO) Capabilities Cost - - - - - 1.253 - - 1.276 - - 1.330 - - - - - 1.330 Gross/Weapon System Cost - - - - - 1.253 - - 1.276 - - 1.330 - - - - - 1.330 LI 834320 - C3 Countermeasures Air Force 1 1 UNCLASSIFIED Page 21 of 25 1 P-1 Line #38 1 1.330 Volume 1 - 443 === page 480 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834320 / C3 Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Mission Defense Teams MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 0.000 8.985 10.562 - 10.562 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.000 8.985 10.562 - 10.562 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.000 8.985 10.562 - 10.562 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Support - Mission Defense Teams Cost Mission Support - - - 0.000 Subtotal: Support - Mission Defense Teams Cost - - - - Gross/Weapon System Cost - - - - (†) Equipment (†) 1 0.000 8.985 - 0.000 - - 0.000 - 1 8.985 10.562 - 8.985 - - 8.985 - 1 10.562 - - - 10.562 1 10.562 - 10.562 - - - - - 10.562 - 10.562 - - - - - 10.562 indicates the presence of a P-5a LI 834320 - C3 Countermeasures Air Force UNCLASSIFIED Page 22 of 25 P-1 Line #38 Volume 1 - 444 === page 481 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 O O C Item Number / Title [DODIC]: Mission Defense Teams FY Contractor and Location Method/Type or Funding Vehicle Mission Support Equipment 2026 TBD / TBD TBD AFLCMC/HN Mar 2026 Mar 2026 1 8.985 Y Mission Support Equipment 2027 TBD / TBD TBD AFLCMC/HN Mar 2027 Mar 2027 1 10.562 Y Cost Elements (†) (†) P-1 Line Item Number / Title: 834320 / C3 Countermeasures Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 834320 - C3 Countermeasures Air Force UNCLASSIFIED Page 23 of 25 P-1 Line #38 Volume 1 - 445 === page 482 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834320 / C3 Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Mission Defense Teams Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Fiscal Year 2027 Calendar Year 2026 O C T N O V D E C J A N F E B M A R O C T N O V D E C J A N F E B M A R Calendar Year 2027 A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Mission Support Equipment 1 2026 AF 1 0 LI 834320 - C3 Countermeasures Air Force 1 A1 0 UNCLASSIFIED Page 24 of 25 P-1 Line #38 Volume 1 - 446 === page 483 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834320 / C3 Countermeasures Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Item Number / Title [DODIC]: Mission Defense Teams Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 1 1 1 TBD - TBD ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 1 Manufacturing PLT 6 Total After Oct 1 0 Remarks: Note: MSR, ECON, and MAX are Not Applicable. Items procured are Commercial Off The Shelf (COTS). "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 834320 - C3 Countermeasures Air Force UNCLASSIFIED Page 25 of 25 P-1 Line #38 Volume 1 - 447 6 === page 484 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 448 === page 485 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834470 / Defense Enterprise Accounting & Mgt Sys Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0901554F Line Item MDAP/MAIS Code: N87 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 3.219 0.000 0.698 0.000 - 0.000 0.000 0.000 0.000 0.000 0.000 3.917 Total - - - - - - - - - - - - 3.219 0.000 0.698 0.000 - 0.000 0.000 0.000 0.000 0.000 0.000 3.917 - - - - - - - - - - - - 3.219 0.000 0.698 0.000 - 0.000 0.000 0.000 0.000 0.000 0.000 3.917 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The Defense Enterprise Accounting & Management System (DEAMS) is an Enterprise Resource Planning (ERP) program built upon the commercial-off-the-shelf (COTS) Oracle e-Business Suite (EBS) solution. DEAMS is the Department of the Air Force's (DAF) core accounting solution providing a modern financial management capability with robust auditability at its core, making it fundamental to achieving the Secretary of War's (SECWAR) priority for a clean Pentagon audit. By enhancing the accuracy of financial data and strengthening internal controls, DEAMS delivers the accountability necessary to ensure fiscal accountability, the responsible use of taxpayer dollars, and maintain public trust. DEAMS uses critical financial data to enhance future program planning and execution and will provide greater transparency to defense spending, making it easier to track how funds are being used and identify potential areas for savings. FY2027 funding will support continued capability development and functionalities within the system. This includes the on-going efforts of making system improvements to maintain an unqualified System and Organizations Control (SOC) audit opinion, ensuring compliance with audit and transparency requirements. Additionally, the funding will be used to continue to enhance the Governmental-Invoicing (G-Invoicing) capability to standardize intragovernmental buy/sell transactions as well as enhance data integrity and automation by evolving the Treasury Direct Disbursement (TDD) capability. The program will also begin integrating the Foreign Military Sales (FMS) accounting systems with DEAMS for improved financial visibility and reconciliation. The funding will also be used to continue to modernize technology by upgrading the Oracle e-Business Suite (EBS) infrastructure and analytic products. These upgrades will enhance system performance, security, and scalability, enabling DEAMS to remain an auditable accounting system. This program element replaces numerous inefficient and/or obsolete legacy systems with a single, integrated platform that standardizes financial data across the DAF. The streamlined approach ensures data consistency and accuracy, critical for reliable financial reporting and informed decision-making. This program element supports the current 17,000 users across all United States Air Force (USAF) and United States Space Force (USSF) bases worldwide, serving all Air Force and Space Force Major Commands, and United States Transportation Command (USTRANSCOM). The DAF has future plans to deploy DEAMS to the acquisition community to include acquisition program executive offices, laboratories, test centers, and air logistics complexes. These deployments will add an additional 4,500 users for a total of 21,500 users. The Defense Enterprise Accounting & Management System (DEAMS) is compliant with the Clinger-Cohen Act and the DoD's Business Enterprise Architecture (BEA). This requirement supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. LI 834470 - Defense Enterprise Accounting & Mgt Sys Air Force UNCLASSIFIED Page 1 of 9 P-1 Line #39 Volume 1 - 449 === page 486 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834470 / Defense Enterprise Accounting & Mgt Sys Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0901554F Line Item MDAP/MAIS Code: N87 This program element included all necessary expenses required to manage, execute, and deliver weapon system capability. The use of such program funds would be in addition to the civilian pay expenses budgeted in program elements 0605829F, 0605831F, 0605833F, and 0605898F. This program is in Budget Activity 7, Operational System Development because this budget activity includes development efforts to upgrade systems that have been fielded or have received approval for full rate production and anticipate production funding in the current or subsequent fiscal year. Funding for this exhibit is contained in PE 0901554F. LI 834470 - Defense Enterprise Accounting & Mgt Sys Air Force UNCLASSIFIED Page 2 of 9 P-1 Line #39 Volume 1 - 450 === page 487 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834470 / Defense Enterprise Accounting & Mgt Sys Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0901554F Line Item MDAP/MAIS Code: N87 Exhibits Schedule Exhibit Type Title* P-5 Defense Enterprise Acntng and Mgt Sys (DEAMS) P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 3.219 - / 0.000 - / 0.698 - / 0.000 - / - - / 0.000 - / 3.219 - / 0.000 - / 0.698 - / 0.000 - / - - / 0.000 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: No FY2027 Budget Year funding requested. All planned acquisition buys for end-user licenses have been met as of FY2026. LI 834470 - Defense Enterprise Accounting & Mgt Sys Air Force UNCLASSIFIED Page 3 of 9 P-1 Line #39 Volume 1 - 451 === page 488 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834470 / Defense Enterprise Accounting & Mgt Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Defense Enterprise Acntng and Mgt Sys (DEAMS) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 3.219 0.000 0.698 0.000 - 0.000 - - - - - - 3.219 0.000 0.698 0.000 - 0.000 - - - - - - 3.219 0.000 0.698 0.000 - 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ M) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Software - Defense Enterprise Acntng and Mgt Sys (DEAMS) Cost Recurring Cost (†) Hardware/Software 0.001 3,219 3.219 - - 0.000 0.001 698 0.698 - - 0.000 - - - - - 0.000 Subtotal: Recurring Cost - - 3.219 - - 0.000 - - 0.698 - - 0.000 - - - - - 0.000 Subtotal: Software - Defense Enterprise Acntng and Mgt Sys (DEAMS) Cost - - 3.219 - - 0.000 - - 0.698 - - 0.000 - - - - - 0.000 Gross/Weapon System Cost - - 3.219 - - 0.000 - - 0.698 - - 0.000 - - - - - 0.000 Remarks: The decrease in funding from FY2026 to FY2027 reflects the current license count being adequate to support the planned deployment schedule. (†) indicates the presence of a P-5a LI 834470 - Defense Enterprise Accounting & Mgt Sys Air Force UNCLASSIFIED Page 4 of 9 P-1 Line #39 Volume 1 - 452 === page 489 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (†) Hardware/Software (†) Hardware/Software Hardware/Software (†) Hardware/Software (†) O O C P-1 Line Item Number / Title: 834470 / Defense Enterprise Accounting & Mgt Sys FY Contractor and Location Method/Type or Funding Vehicle 2021 V3GATE, LLC. / CO SS / FFP AFLCMC/HI - Business & Enterprise Systems Dec 2020 Feb 2021 22 0.001 Y Sep 2020 2022 V3GATE, LLC. / CO SS / FFP AFLCMC/HI - Business & Enterprise Systems Nov 2022 Feb 2023 3,081 0.001 Y Sep 2022 2023 V3GATE, LLC. / CO SS / FFP AFLCMC/HI - Business & Enterprise Systems Dec 2023 Feb 2024 116 0.001 Y Nov 2022 2026 DLT Solutions, LLC. / TBD SS / FFP AFLCMC/HI - Business & Enterprise Systems May 2026 Aug 2026 698 0.001 Y Feb 2026 Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: Defense Enterprise Acntng and Mgt Sys (DEAMS) Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date indicates the presence of a P-21 Remarks: The decrease of .698M in funding from FY2026 to FY2027 reflects the current anticipated license count being met in support of the planned deployment schedule. LI 834470 - Defense Enterprise Accounting & Mgt Sys Air Force UNCLASSIFIED Page 5 of 9 P-1 Line #39 Volume 1 - 453 === page 490 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834470 / Defense Enterprise Accounting & Mgt Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Defense Enterprise Acntng and Mgt Sys (DEAMS) Fiscal Year 2021 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT Fiscal Year 2022 Calendar Year 2021 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2022 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Hardware/Software 1 2021 AF (1) 22 0 22 1 2022 AF (2) 3,081 0 3,081 2 2026 AF 698 0 698 A - - 22 0 3,081 698 O C T N O V D E C LI 834470 - Defense Enterprise Accounting & Mgt Sys Air Force J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 9 S E P O C T N O V D E C J A N F E B P-1 Line #39 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 454 === page 491 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834470 / Defense Enterprise Accounting & Mgt Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Defense Enterprise Acntng and Mgt Sys (DEAMS) Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Fiscal Year 2024 Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Hardware/Software 1 2021 AF (1) 22 22 0 1 2022 AF (2) 3,081 0 3,081 2 2026 AF 698 0 698 0 A - - - 3,081 0 698 O C T N O V D E C LI 834470 - Defense Enterprise Accounting & Mgt Sys Air Force J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 9 S E P O C T N O V D E C J A N F E B P-1 Line #39 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 455 === page 492 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834470 / Defense Enterprise Accounting & Mgt Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Defense Enterprise Acntng and Mgt Sys (DEAMS) Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Fiscal Year 2026 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Hardware/Software 1 2021 AF (1) 22 22 0 1 2022 AF (2) 3,081 3,081 0 2 2026 AF 698 0 698 0 0 A O C T N O V D E C LI 834470 - Defense Enterprise Accounting & Mgt Sys Air Force J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 9 S E P O C T N O V D E C J A N F E B P-1 Line #39 M A R A P R M A Y J U N J U L 698 A U G 0 S E P Volume 1 - 456 === page 493 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834470 / Defense Enterprise Accounting & Mgt Sys Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Production Rates (Each / Month) MFR Ref # Item Number / Title [DODIC]: Defense Enterprise Acntng and Mgt Sys (DEAMS) Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 698 698 1 V3GATE, LLC. - CO 2 DLT Solutions, LLC. - TBD ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 0 0 0 0 0 0 0 0 0 0 0 0 698 8 3 11 Remarks: FY2021 - FY2026 funding procures COTS software licenses for developed software. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (1) (2) Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. LI 834470 - Defense Enterprise Accounting & Mgt Sys Air Force UNCLASSIFIED Page 9 of 9 P-1 Line #39 Volume 1 - 457 === page 494 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 458 === page 495 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834520 / Theater Battle Mgt C2 System Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - - 0.991 0.433 0.442 0.460 - 0.460 0.470 0.479 0.487 0.497 - 4.259 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Total - - - - - - - - - - - - 0.991 0.433 0.442 0.460 - 0.460 0.470 0.479 0.487 0.497 - 4.259 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) To FY 2031 Complete - - - - - - - - - - - - 0.991 0.433 0.442 0.460 - 0.460 0.470 0.479 0.487 0.497 - 4.259 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Personnel Recovery Command and Control (PRC2) Provides PRC2 services supporting all Combatant Commands, Joint Services and other government agencies. Capabilities include web-based access to isolated personnel reports for all Department of War (DoW) personnel, tools for performing command and control (C2) of recovery efforts for downed airmen/isolated ground troops, and rapid identification of personnel in distress. PRC2 is used within Air Operations Center (AOC)/Areas of Responsibility (AOR), Joint Personnel Recovery Centers, and Rescue Coordination Centers to provide the capabilities and services for planning and executing recovery of isolated personnel, and rapidly collaborate, disseminate, and store time-sensitive personnel recovery information. Funding in this exhibit contained in PE 0305984F, Personnel Recovery Command and Control (PRC2) LI 834520 - Theater Battle Mgt C2 System Air Force UNCLASSIFIED Page 1 of 5 P-1 Line #40 Volume 1 - 459 === page 496 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834520 / Theater Battle Mgt C2 System Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-3a 1 / PRC2 (Capability Improvement) P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code A Exhibits Schedule Exhibit Type Title* P-3a 1 / PRC2 (Capability Improvement) P-40 Total Gross/Weapon System Cost Subexhibits ID CD A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 0.991 - / 0.433 - / 0.442 - / 0.460 - / 0.991 - / 0.433 - / 0.442 - / 0.460 - / 0.000 - / - - / 0.460 / 0.460 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 0.470 - / 0.479 - / 0.487 - / 0.497 - / - - / 4.259 - / 0.470 - / 0.479 - / 0.487 - / 0.497 - / - - / 4.259 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Funding in FY 2027 will continue to provide Personnel Recovery Command and Control (PRC2) services supporting all Combatant Commands, Joint Services and other government agencies. The PRC2 program office utilizes organic labor from 517th Software Engineering Squadron (SWES) at Hill AFB, UT. FY 2027 funds will continue to sustain virtual data centers, developmental network data centers, and miscellaneous hardware and software sustainment and upgrades. FY 2027 funding will support capabilities to include web-based access to isolated personnel reports for all Department of War (DoW) personnel, Command and Control (C2) tools for performing command and control of recovery efforts for downed airmen/isolated ground troops, and rapid identification of personnel in distress. PRC2 is used within the Air Operations Center (AOC)/Areas of Responsibility (AOR), Joint Personnel Recovery Centers, and Rescue Coordination Centers to provide the capabilities and services for planning and executing recovery of isolated personnel. LI 834520 - Theater Battle Mgt C2 System Air Force UNCLASSIFIED Page 2 of 5 P-1 Line #40 Volume 1 - 460 === page 497 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 P-1 Line Item Number / Title: 834520 / Theater Battle Mgt C2 System ID Code (A=Service Ready, B=Not Service Ready) : A Resource Summary MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - - 0.991 0.433 0.442 0.460 0.000 0.460 0.470 0.479 0.487 0.497 - 4.259 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) To FY 2031 Complete Total - - - - - - - - - - - - 0.991 0.433 0.442 0.460 0.000 0.460 0.470 0.479 0.487 0.497 - 4.259 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / PRC2 - - - - - - - - - - - - 0.991 0.433 0.442 0.460 0.000 0.460 0.470 0.479 0.487 0.497 - 4.259 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Provides Personnel Recovery Command and Control (PRC2) services supporting all Combatant Commands, Joint Services and other government agencies. Capabilities include web-based access to isolated personnel reports for all Department of War (DoW) personnel, tools for performing C2 of recovery efforts for downed airmen/isolated ground troops, and rapid identification of personnel in distress. PRC2 is used within Air Operations Center (AOC)/Areas Of Responsibility (AOR), Joint Personnel Recovery Centers, and Rescue Coordination Centers to provide the capabilities and services for planning and executing recovery of isolated personnel, and rapidly collaborate, disseminate, and store time-sensitive personnel recovery information. PRC2 procurement funding satisfies the requirement of the hardware and software needs for the Development Network (DevNet) utilized by the Organic Depot that develops PRC2 applications. Additionally, PRC2 provides logistics support to manage the DevNet. Milestone/Development Status PRC2 is a cloud-based architecture providing database and web-based services and tools to host Personnel Recovery applications. PRC2 is a designated Platform Information Technology (PIT) system with two PIT software components. PRC2 has two major web applications designed to operate independently from each other: (1) Personnel Recovery Mission Software (PRMS); and (2) Personnel Recovery Mission Manager (PRMM). These applications perform a special-purpose war fighting mission that supports Personnel Recovery (PR) operations. The applications aid in rescuing Isolated Personnel (IP) from hostile forces. PRC2 resources consist of Commercial off-the-shelf (COTS) and Government off-the-shelf (GOTS) developed software. The PRC2 program office utilizes organic labor from 517th Software Engineering Squadron (SWES) at Hill AFB, UT. Funds will continue to sustain virtual data centers, developmental network data centers, and miscellaneous hardware and software sustainment and upgrades. LI 834520 - Theater Battle Mgt C2 System Air Force UNCLASSIFIED Page 3 of 5 P-1 Line #40 Volume 1 - 461 === page 498 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 834520 / Theater Battle Mgt C2 System Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A MDAP/MAIS Code: Models of Systems Affected: PRC2 Modification Type: Capability Improvement Prior Years Financial Plan Modification Number / Title: 1 / PRC2 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: PRC2 Hardware & COTS Software A Kits Recurring PRC2 Hardware & COTS Software:INSTALL KITS Group A (Active) Subtotal: Recurring Subtotal: PRC2 Hardware & COTS Software Subtotal: Procurement, All Modification Items - / 0.716 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.716 - / 0.716 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.716 - / 0.716 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.716 - / 0.716 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 0.716 - / 0.275 - / 0.433 - / 0.442 - / 0.460 - / - - / 0.460 - / 0.470 - / 0.479 - / 0.487 - / 0.497 - / - - / 3.543 - / 0.275 - / 0.433 - / 0.442 - / 0.460 - / - - / 0.460 - / 0.470 - / 0.479 - / 0.487 - / 0.497 - / - - / 3.543 / - - / - / - - / - Support (All Modification Items) GROUP A: TOTAL NONRECURRING Subtotal: Support Installation Subtotal: Installation - / - - / - - / - - - / - - / - - / - - / - - - / - Total Total Cost (Procurement + Support + Installation) LI 834520 - Theater Battle Mgt C2 System Air Force 0.991 0.433 0.442 0.460 0.000 UNCLASSIFIED Page 4 of 5 0.460 0.470 0.479 P-1 Line #40 0.487 0.497 - 4.259 Volume 1 - 462 === page 499 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 P-1 Line Item Number / Title: 834520 / Theater Battle Mgt C2 System ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: 1 / PRC2 MDAP/MAIS Code: Modification Item 1 of 1: PRC2 Hardware & COTS Software Manufacturer Information Manufacturer Name: 517th Software Engineering Squadron (517 SWES) Manufacturer Location: Hill AFB, UT Administrative Leadtime (in Months): 0 Dates FY 2025 Production Leadtime (in Months): 0 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Org/Intermediate LI 834520 - Theater Battle Mgt C2 System Air Force Installation Quantity: 0 UNCLASSIFIED Page 5 of 5 P-1 Line #40 Volume 1 - 463 === page 500 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 464 === page 501 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834530 / Air & Space Operations Center (AOC) Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Procurement Quantity (Units in Each) - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 20.545 22.785 23.778 - 23.778 24.284 24.745 25.200 25.703 - Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 20.545 22.785 23.778 - 23.778 24.284 24.745 25.200 25.703 - Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 20.545 22.785 23.778 - 23.778 24.284 24.745 25.200 25.703 - Total 167.040 167.040 167.040 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The Air Operations Center Weapon System (AOC WS), AN/USQ-163 Falconer, the senior element of the Theater Air Control System, is the weapon system that the Commander, Air Force Forces (COMAFFOR) provides the Combined/Joint Force Air Component Commander (C/JFACC) for monitoring, planning, executing and assessing theater-wide air and space operations in support of the air battle campaign to meet the Combined/Joint Force Commander's (C/JFC) objectives. AOC includes the fielded AOC 10.1 WS and modernized AOC WS. The Air Operations Center (AOC) 10.1 WS is a comprehensive "system of systems" - encompassing computer and network infrastructure, software, and radios - that serves as the critical foundation for 24/7 global air operations. Currently, AOC 10.1 provides the sustainment capabilities for infrastructure and baseline applications at 23 on-premise AOC locations. This Program Element (PE) funds the modernization of this existing on-premise architecture, enabling the decommissioning of outdated legacy systems, standardizing the AOC enterprise, and enhancing performance and interoperability to mitigate vulnerabilities that disrupt operations and impede WS re-accreditation. Funding for this exhibit contained in PE 0207410F, Air Operations Center Weapon System The All Domain Common Platform (ADCP) is an extensible cloud-based Infrastructure and Platform as a Service (IaaS/PaaS) hosting medium built to deliver highly resilient Command and Control (C2) mission applications and data to Airmen deployed around the world. ADCP is a warfighting capability that enables on-boarded users to build, deploy and monitor mission applications to the end state of production. Having applications operational in various environments ensures data is accessible as it is needed across United States Air Force (USAF) mission sets. The ADCP's collection of technologies, services, and tooling enables warfighter outcomes by abstracting away technical complexity and enabling the deployment of products onto its infrastructure. The ADCP is the primary path to production for modernized C2 software-intensive systems. Platform customers include the Air Operations Center (AOC), Intelligence Programs, the 309th Software Engineering Group, the 350th Spectrum Warfare Group, and others. ADCP is USAF's contributing platform to the DAF Battle Network and Joint All-Domain Command and Control (JADC2), meeting system resiliency requirements through the escalating phases of warfare. Funding for this exhibit contained in PE 0303248F, All Domain Common Platform (ADCP) Efforts within this program align with and depend upon USAF investment in Mission Planning Systems (PE 0208006F), Air Operations Center (PE 0207410F), Flight Operations (PE 0207461F), All Domain Common Platform (0303248F), Command and Control Incident Management Emergency Response Application (C2IMERA) (0305836F) and Advanced Battle Management System (ABMS) (0604003F) to deliver LI 834530 - Air & Space Operations Center (AOC) Air Force UNCLASSIFIED Page 1 of 16 P-1 Line #41 Volume 1 - 465 === page 502 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834530 / Air & Space Operations Center (AOC) Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A the Theater Air Planning System of Systems (TAP-SoS) architecture for the DAF BATTLE NETWORK. This program's efforts directly provide the development, infrastructure, and support necessary for each of these programs and TAP-SoS interdependencies, which provides the capabilities necessary for deliberate planning, dynamic mission replanning, friendly order of battle management, and mission tasking and execution. LI 834530 - Air & Space Operations Center (AOC) Air Force UNCLASSIFIED Page 2 of 16 P-1 Line #41 Volume 1 - 466 === page 503 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834530 / Air & Space Operations Center (AOC) Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 Air & Space Operations Center (AOC) P-5a, P-21 A - / - - / 20.034 - / 22.264 - / 23.234 - / - - P-5 All Domain Common Platform P-5a, P-21 A - / - - / 0.511 - / 0.521 - / 0.544 - / - - / 23.234 / 0.544 P-40 Total Gross/Weapon System Cost - / - - / 20.545 - / 22.785 - / 23.778 - / - - / 23.778 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: PE 0207410F Air Operations Center Weapon System: FY 2027 procurement funding for Air Operations Center Weapon System (AOC WS) Modifications support integration and fielding of improvements/upgrades of existing 3rd Party applications as well as newly developed replacement applications, capital equipment replacement (CER) to address commercial end-of-life/end-of-support/direct mission support components including components associated with C2 applications (3rd Party commercial and government off the shelf (COTS/GOTS)) and network infrastructure. Funding supports continuing to shift the AOC WS toward a cloud-based commercially managed infrastructure and platform as a service (IaaS/ PaaS). These AOC WS Modifications are required for the AOC to keep pace with evolving COTS/GOTS components, Department of War directives, changes in the underlying IT and network environment, and to remain interoperable, certified, supportable, and compliant through software engineering solutions, integration, testing, fielding, training, and sustainment of new capabilities and upgrades to the AOC WS. AOC Modifications will be accomplished through Agile Release Events, periodic maintenance upgrades, emergency fixes, cyber security improvements and other integration activities. FY 2027 procurement funds will also be used to support the planned acquisition of commercial IT equipment to implement Trusted Thin Client Phase Information Technology (II), which will incorporate additional networks into the Operational Support Facility's secure, internal/external multi-network architecture based on operational requirements. FY 2027 procurement funds will be used to evaluate and implement new Command and Control Enterprise Comm-IT capabilities. FY 2027 funds will also support Capital Equipment Replacement of the existing on-premise equipment in the Operational Support Facility and Combined AOC - Experimental (CAOC-X) site. FY 2027 procurement funds will be used to support multiple comm-IT equipment purchases for the CAOC-X experimentation activities is support of the AOC WS and Air Battle Management System (ABMS) Battle Lab environment. FY 2027 procurement funds may be used on projects to evaluate AOC Enterprise comm-IT capabilities such as: a. Zero Trust end-point technology b. Connectivity to the Mission Partner Environment for coalition support c. Internet-based secure communication using Commercial Solutions for Classified d. Support to Joint All Domain Command and Control operations using Multi-Level Security data transfer capabilities e. Integration within the Theater Air Planning System of Systems (TAP-SoS) architecture for the DAF BATTLE NETWORK FY 2027 procurement increases due to additional equipment required as part of the ongoing AOC modernization effort. PE 0303248F, All Domain Common Platform: LI 834530 - Air & Space Operations Center (AOC) Air Force UNCLASSIFIED Page 3 of 16 P-1 Line #41 Volume 1 - 467 === page 504 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 834530 / Air & Space Operations Center (AOC) Equip / BSA 4: Spcl Comm-Electronics Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Air Domain Common Platform (ADCP) enables AOC modernization by providing tools, infrastructure and technical expertise to build and deploy modern cloud-based apps across a global infrastructure at multiple classification levels. ADCP enables AOC to scale across the AOC enterprise and allows distributed operations. Distributed ops directly support the joint all domain command and control (JADC2) operational imperative and force resilience in major conflict. FY 2027 Procurement funds will fund lead command to build up the infrastructure and development for the Command-and-Control Network and Security Operations Center (C2NSOC) at Langley Air Force Base, VA. Planned procurement activities include: a. Infrastructure to build out the network and security operations center (C2NSOC) capability for 24/7/365 mission support b. Upgraded equipment to provide Cybersecurity and support to the DAF Battle Network through unparalleled command, control, and cyber defensive capabilities, ensuring the Air Components a resilient and efficient Global data exchange from the warfighter C2 network to the tactical edge c. Tools and engineering technical services to establish a capability to store and document all security incidents and provide centralized source of information for C2NSOC staff LI 834530 - Air & Space Operations Center (AOC) Air Force UNCLASSIFIED Page 4 of 16 P-1 Line #41 Volume 1 - 468 === page 505 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834530 / Air & Space Operations Center (AOC) Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Air & Space Operations Center (AOC) MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 20.034 22.264 23.234 - 23.234 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 20.034 22.264 23.234 - 23.234 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 20.034 22.264 23.234 - 23.234 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Air & Space Operations Center (AOC) Cost Recurring Cost 1.a.1. CAPTIAL EQUIPMENT REPLACEMENT: GEOGRAPHIC/ GLOBAL (formerly known as Functional) - - - 5.656 1 5.656 7.283 1 7.283 7.865 1 7.865 - - - 7.865 1 7.865 1.a.2. CAPITAL EQUIPMENT REPLACEMENT: AOC SUPPORT SITES - AD - - - 3.143 1 3.143 3.713 1 3.713 3.976 1 3.976 - - - 3.976 1 3.976 1.a.4. CAPITAL EQUIPMENT REPLACEMENT RESERVE - - - 1.257 1 1.257 1.485 1 1.485 1.875 1 1.875 - - - 1.875 1 1.875 1.a.5: CAPITAL EQUIPMENT REPLACEMENT GUARD - - - 3.143 1 3.143 3.714 1 3.714 3.296 1 3.296 - - - 3.296 1 3.296 1.c. FIELDING SPO SUPPORT - - - 2.018 1 2.018 1.601 1 1.601 1.695 1 1.695 - - - 1.695 1 1.695 AOC Deployable Mini Kit - - - 0.500 1 0.500 - - - - - - - - - - - - JADC2/ABMS Lab Experimentation - - - 0.640 1 0.640 - - - - - - - - - - - - (†) AOC - AD LI 834530 - Air & Space Operations Center (AOC) Air Force UNCLASSIFIED Page 5 of 16 P-1 Line #41 Volume 1 - 469 === page 506 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834530 / Air & Space Operations Center (AOC) Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Air & Space Operations Center (AOC) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) TRAX Suite - - - 0.400 1 0.400 - - - - - - - - - - - - Zero Trust Security - - - 0.854 1 0.854 - - - - - - - - - - - - Monitors Tech Refresh - - - - - - 0.400 1 0.400 - - - - - - - - - TTC Project 2X - - - - - - 0.350 1 0.350 - - - - - - - - - NIPRNET File Server Tech Refresh - - - - - - 0.100 1 0.100 - - - - - - - - - Red Had Open Shift - - - - - - 0.100 1 0.100 - - - - - - - - - Releasable Network AOC Suite - - - - - - 1.498 1 1.498 - - - - - - - - - Capital Equipment Replacement (CER) - - - - - - - - - 0.527 0.527 - - - 0.527 IT Infrastructure Equipment - - - - - - - - - 2.000 2.000 - - - 2.000 Subtotal: Recurring Cost - - - - - 17.611 - - 20.244 - - 21.234 - - - - - 21.234 Subtotal: Hardware - Air & Space Operations Center (AOC) Cost - - - - - 17.611 - - 20.244 - - 21.234 - - - - - 21.234 2.a. PROGRAM MANAGEMENT: PROGRAM SUPPORT - - - 2.423 2.423 2.020 2.020 2.000 2.000 - - - 2.000 Subtotal: Support - Support End Item Cost - - - - - 2.423 - - 2.020 - - 2.000 - - - - - 2.000 Gross/Weapon System Cost - - - - - 20.034 - - 22.264 - - 23.234 - - - - - 23.234 1 1 1 1 0.527 2.000 Support - Support End Item Cost 1 1 1 1 2.000 Remarks: 1). Due to different levels of complexity, differences in equipment to be updated, and length of required time necessary for modification, the total cost will fluctuate between fiscal years. 2). Differences in site specific setup (due to variations between mission specific needs and differences in site type i.e., Geographic vs. Global (formally known as Functional) vs. Associated Support Site vs. Air Reserve Component Sites) will drive differences in site specific requirements (e.g., time required, hardware required and software required). This makes quantification impossible, as there is no single baseline to produce a quantity against. Per DoD Financial Regulation 7000.14-R, Volume 2B, Chapter 4, Exhibit P-5 Instruction, the quantities in the P-5 would be left blank as there is no way to report applicable quantities however in order to generate the P5A and P21 each element has been marked as "1". 3). FY 2027 funds will support Capital Equipment Replenishment (CER) of the existing on-premise equipment in the Operational Support Facility (OSF) and Combined AOC - Experimental (CAOC-X) site. (†) indicates the presence of a P-5a LI 834530 - Air & Space Operations Center (AOC) Air Force UNCLASSIFIED Page 6 of 16 P-1 Line #41 Volume 1 - 470 === page 507 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements 1.a.1. CAPTIAL EQUIPMENT REPLACEMENT: GEOGRAPHIC/ GLOBAL (formerly known as O O C P-1 Line Item Number / Title: 834530 / Air & Space Operations Center (AOC) Item Number / Title [DODIC]: Air & Space Operations Center (AOC) FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) 2025 Various / Various Various Hanscom AFB Jul 2025 Aug 2025 1 5.656 Y 2026 Various / Various Various Hanscom AFB Jul 2026 Aug 2026 1 7.283 Y 2027 Various / Various Various Hanscom AFB Jul 2027 Aug 2027 1 7.865 Y Qty (Each) RFP Issue Date Jan 2025 (†) Functional) AOC - AD 1.a.1. CAPTIAL EQUIPMENT REPLACEMENT: GEOGRAPHIC/ GLOBAL (formerly known as (†) Functional) AOC - AD 1.a.1. CAPTIAL EQUIPMENT REPLACEMENT: GEOGRAPHIC/ GLOBAL (formerly known as (†) Functional) AOC - AD (†) indicates the presence of a P-21 Remarks: 1) Due to different levels of complexity, differences in equipment to be updated, and length of required time necessary for modification, the total cost will fluctuate between fiscal years. 2) Differences in site specific setup (due to variations between mission specific needs and differences in site type i.e., Geographic vs. Global (formally known as Functional) vs. Associated Support Site vs. Air Reserve Component Sites) will drive differences in site specific requirements (e.g., time required, hardware required and software required). This makes quantification impossible, as there is no single baseline to produce a quantity against. Per DoD Financial Regulation 7000.14-R, Volume 2B, Chapter 4, Exhibit P-5 Instruction, the quantities in the P-5 would be left blank as there is no way to report applicable quantities however in order to generate the P5A and P21 each element has been marked as "1". LI 834530 - Air & Space Operations Center (AOC) Air Force UNCLASSIFIED Page 7 of 16 P-1 Line #41 Volume 1 - 471 === page 508 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834530 / Air & Space Operations Center (AOC) Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Air & Space Operations Center (AOC) Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Fiscal Year 2026 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.a.1. CAPTIAL EQUIPMENT REPLACEMENT: GEOGRAPHIC/GLOBAL (formerly known as Functional) AOC - AD 1 2025 AF 1 0 1 1 2026 AF 1 0 1 1 2027 AF 1 0 1 A - 1 0 A - 1 0 1 O C T N O V D E C LI 834530 - Air & Space Operations Center (AOC) Air Force J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #41 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 472 === page 509 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834530 / Air & Space Operations Center (AOC) Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Air & Space Operations Center (AOC) Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 1.a.1. CAPTIAL EQUIPMENT REPLACEMENT: GEOGRAPHIC/GLOBAL (formerly known as Functional) AOC - AD 1 2025 AF 1 1 0 1 2026 AF 1 1 0 1 2027 AF 1 0 1 0 0 A O C T N O V D E C LI 834530 - Air & Space Operations Center (AOC) Air Force J A N F E B M A R A P R M A Y J U N J U L 1 A U G UNCLASSIFIED Page 9 of 16 0 S E P O C T N O V D E C J A N F E B P-1 Line #41 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 473 === page 510 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834530 / Air & Space Operations Center (AOC) Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: Air & Space Operations Center (AOC) Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Various - Various MSR For 2027 1-8-5 For 2027 MAX For 2027 1 1 1 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 1 Manufacturing PLT 10 Total After Oct 1 1 11 Remarks: 1) Due to different levels of complexity, differences in equipment to be updated, and length of required time necessary for modification, the total cost will fluctuate between fiscal years. 2) Differences in site specific setup (due to variations between mission specific needs and differences in site type i.e., Geographic vs. Global (formally known as Functional) vs. Associated Support Site vs. Air Reserve Component Sites) will drive differences in site specific requirements (e.g., time required, hardware required and software required). This makes quantification impossible, as there is no single baseline to produce a quantity against. Per DoD Financial Regulation 7000.14-R, Volume 2B, Chapter 4, Exhibit P-5 Instruction, the quantities in the P-5 would be left blank as there is no way to report applicable quantities however in order to generate the P5A and P21 each element has been marked as "1". "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 834530 - Air & Space Operations Center (AOC) Air Force UNCLASSIFIED Page 10 of 16 P-1 Line #41 Volume 1 - 474 === page 511 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 834530 / Air & Space Operations Center (AOC) Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: All Domain Common Platform MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 0.511 0.521 0.544 - 0.544 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.511 0.521 0.544 - 0.544 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.511 0.521 0.544 - 0.544 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - All Domain Common Platform Cost Recurring Cost Capital Equipment Replacement (End of - - - 0.511 - - - - - - - - - - Subtotal: Recurring Cost Subtotal: Hardware - All Domain Common Platform Cost Gross/Weapon System Cost (†) Life Components) Comm-IT Workstation procurement/ replacements (†) Capital Equipment Replacement (End of Life Components) Server Replacement/ 1 0.511 0.491 1 0.491 - - - - - - - - - - - 0.002 15 0.030 - - - - - - - - - - - - - - - 0.041 5 0.204 - - - 0.041 5 0.204 - - - - - - - 0.003 27 0.081 - - - 0.003 27 0.081 - - - - - - - - 0.029 9 0.259 - - - 0.029 9 0.259 - - - - - 0.511 - - 0.521 - - 0.544 - - - - - 0.544 - - - - - 0.511 - - 0.521 - - 0.544 - - - - - 0.544 - - - - - 0.511 - - 0.521 - - 0.544 - - - - - 0.544 (†) Outfitting Comm-IT (Workstation procurement/ replacements) (†) Capital Equipment Replacement (End of Life Components) (Network Equipment/ (†) Sustainment) LI 834530 - Air & Space Operations Center (AOC) Air Force UNCLASSIFIED Page 11 of 16 P-1 Line #41 Volume 1 - 475 === page 512 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 P-1 Line Item Number / Title: 834530 / Air & Space Operations Center (AOC) ID Code (A=Service Ready, B=Not Service Ready) : A (†) Item Number / Title [DODIC]: All Domain Common Platform MDAP/MAIS Code: indicates the presence of a P-5a LI 834530 - Air & Space Operations Center (AOC) Air Force UNCLASSIFIED Page 12 of 16 P-1 Line #41 Volume 1 - 476 === page 513 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 O O C Item Number / Title [DODIC]: All Domain Common Platform FY Contractor and Location Method/Type or Funding Vehicle 2025 TBD / Various MIPR ACC Feb 2025 Jun 2025 1 0.511 Y 2026 TBD / Various MIPR ACC Feb 2026 Aug 2026 1 0.491 Y 2026 TBD / various Various ACC Jan 2026 Mar 2026 15 0.002 Y Capital Equipment Replacement (End of Life Components) - Server Replacement/Outfitting 2027 TBD / Various Various ACC Jan 2027 Mar 2027 5 0.041 Y Comm-IT (Workstation procurement/replacements) 2027 TBD / Various Various ACC Jan 2027 Mar 2027 27 0.003 Y Capital Equipment Replacement (End of Life Components) (Network Equipment/Sustainment) 2027 TBD / Various Various ACC Jan 2027 Mar 2027 9 0.029 Y Cost Elements Capital Equipment Replacement (†) (End of Life Components) Capital Equipment Replacement (†) (End of Life Components) Comm-IT Workstation procurement/ (†) replacements (†) P-1 Line Item Number / Title: 834530 / Air & Space Operations Center (AOC) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 834530 - Air & Space Operations Center (AOC) Air Force UNCLASSIFIED Page 13 of 16 P-1 Line #41 Volume 1 - 477 === page 514 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834530 / Air & Space Operations Center (AOC) Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: All Domain Common Platform Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Fiscal Year 2026 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Capital Equipment Replacement (End of Life Components) 1 2025 AF 1 0 1 1 2026 AF 1 0 1 A - - - - 1 0 A - - - - - - 1 0 Comm-IT Workstation procurement/replacements 2 2026 AF 15 0 15 A O C T N O V D E C LI 834530 - Air & Space Operations Center (AOC) Air Force J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #41 15 M A R 0 A P R M A Y J U N J U L A U G S E P Volume 1 - 478 === page 515 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834530 / Air & Space Operations Center (AOC) Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: All Domain Common Platform Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Capital Equipment Replacement (End of Life Components) 1 2025 AF 1 1 0 0 1 2026 AF 1 1 0 0 Comm-IT Workstation procurement/replacements 2 2026 AF 15 15 0 0 O C T N O V D E C LI 834530 - Air & Space Operations Center (AOC) Air Force J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #41 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 479 === page 516 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 834530 / Air & Space Operations Center (AOC) Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 4 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: All Domain Common Platform Procurement Leadtime (Months) Initial Manufacturer Name - Location MAX For 2027 ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 1 TBD - Various 1 1 1 1 5 6 11 0 0 0 0 2 TBD - various 1 1 15 1 4 2 6 0 0 0 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 834530 - Air & Space Operations Center (AOC) Air Force UNCLASSIFIED Page 16 of 16 P-1 Line #41 Volume 1 - 480 === page 517 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 835060 / Base Information Transpt Infrast (BITI) Wired Equip / BSA 5: Air Force Communications ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N78 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 50.320 79.091 457.332 457.332 - - 50.320 79.091 457.332 - - 50.320 79.091 125.702 125.702 125.702 - 125.702 125.702 125.702 173.481 173.481 173.481 134.641 134.641 134.641 121.094 121.094 121.094 To FY 2031 Complete 123.514 123.514 123.514 Total - 1,265.175 - 1,265.175 - 1,265.175 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: BASE INFORMATION TRANSPORT INFRASTRUCTURE (BITI) procures base-level network infrastructure (e.g., routers, switches, access points, controllers, cables, and other IT-networking equipment / infrastructure components) for unclassified and classified Air Force intranet communications. Base Infrastructure Modernization (BIM), under the BITI Program Element (PE), delivers base-level Air Force cyberspace network and integrated information infrastructure for DAF installations (active duty, reserve, and Air National Guard (ANG)) and associated Geographically Separated Units (GSU) at approved locations. The BIM portion of the BITI PE encompasses base-level information transport systems, both Air Force Network (AFNET) non-secure intranet protocol router (NIPR) / secure intranet protocol router (SIPR) wired and wireless network, supporting base mission requirements for digital voice, data, and video systems. This includes commercial device connectivity, Unified Capabilities (UC), and the management systems necessary to manage, protect, and maintain DAF battle networks. BIM: Designs, procures, and delivers a modernized, commercial best-practice Enterprise Information Technology as a Service (EITaaS) network. This network provides a comprehensive, holistic wired and wireless BAN infrastructure, including inside and outside cabling, for the AFNet NIPR and SIPR. This supports the base-level Air and Space Force cyberspace network and integrated information infrastructure for DAF installations (Active Duty, Reserve, and ANG) and associated GSUs at approved locations. BIM supports the DAF initiative to utilize an EITaaS model for IT network operations, maintenance, and sustainment. BIM provides base network infrastructure to remediate current bandwidth and performance issues (improving user experience) DAF-wide. This supports growing Service IT demands and requirements for the AFNet NIPR and SIPR networks. BIM increases data-to-decision speeds, which is foundational to supporting emerging mission communication requirements. The FY2027 funding enables the modernization of 187 Active Duty, Space Force, Reserve, and Air National Guard main operating bases and associated GSUs including the procurement and installation of equipment upgrading the AFNET NIPR/SIPR wired and wireless base-level IT infrastructure. BIM modernization includes sustainment through communications squadron manpower augmentation, directly supporting the DAF's transition to EITaaS. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the armed forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. Funding for this exhibit is contained in PE 0303004F. LI 835060 - Base Information Transpt Infrast (BITI) ... Air Force UNCLASSIFIED Page 1 of 8 P-1 Line #42 Volume 1 - 481 === page 518 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 835060 / Base Information Transpt Infrast (BITI) Wired Equip / BSA 5: Air Force Communications ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N78 Exhibits Schedule Exhibit Type Title* P-5 Air Force Communications (AIRCOM) P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 457.332 - / 50.320 - / 79.091 - / 125.702 - / - - / 125.702 - / 457.332 - / 50.320 - / 79.091 - / 125.702 - / - - / 125.702 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY2027 funding allows for the continuation of the BAN equipment replacement strategy, as 31% of network equipment world-wide is reaching end-of-service (EOS) or end-of-life (EOL). This funding enables the procurement and installation of equipment to upgrade the wired and wireless base-level IT network infrastructure. The total number of bases modernized is driven by the DAF base priority, sizing/complexity (i.e. S, M, L, and XL), and location (Continental US (CONUS) and Outside CONUS (OCONUS)). The FY2026-FY2027 funding increase supports the accelerated completion of Zero Trust efforts. Investment in this PE continues replacement of BITI fielded systems for approved DAF installations. Funding is necessary for government ownership of critical network IT transport infrastructure, licensing, warrantees, etc. whose unit costs exceed expense threshold. Funding includes, but is not limited to, upgrades, design, and implementation of AFNet NIPR/SIPR, wired and wireless broadband and fiber-optic digital information transport networks. These networks provide mission-critical information transport capabilities at fixed DAF bases (Active Duty, Reserve, USSF, and ANG) and associated GSU locations. Procurement efforts include, but are not limited to, site surveys, designs, modernizations, installations, and Program Support Costs (PSC). LI 835060 - Base Information Transpt Infrast (BITI) ... Air Force UNCLASSIFIED Page 2 of 8 P-1 Line #42 Volume 1 - 482 === page 519 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 835060 / Base Information Transpt Infrast (BITI) Wired Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 5 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Air Force Communications (AIRCOM) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) 457.332 Less PY Advance Procurement ($ in Millions) - - 50.320 79.091 - Net Procurement (P-1) ($ in Millions) 457.332 Plus CY Advance Procurement ($ in Millions) - - 50.320 79.091 - Total Obligation Authority ($ in Millions) 457.332 - - 50.320 79.091 FY 2027 Base FY 2027 OOC - - 125.702 FY 2027 Total - - - 125.702 - 125.702 - - - 125.702 - 125.702 - - 125.702 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Air Force Communications (AIRCOM) Cost Recurring Cost (†) 5.521 67 369.889 1.458 31 45.201 2.690 22 59.173 4.595 23 105.688 - - - 4.595 23 105.688 BITI Recap: EQUIPMENT (Active) 0.895 31 27.757 0.734 6 4.406 - - 0.000 - - 0.000 - - - - - 0.000 BITI Recap: EQUIPMENT (Guard) 0.399 54 21.572 - - 0.000 - - 0.000 - - 0.000 - - - - - 0.000 BITI Recap: EQUIPMENT (Reserve) 0.511 5 2.553 - - 0.000 - - 0.000 - - 0.000 - - - - - 0.000 BIM Subtotal: Recurring Cost Subtotal: Hardware - Air Force Communications (AIRCOM) Cost - - 421.771 - - 49.607 - - 59.173 - - 105.688 - - - - - 105.688 - - 421.771 - - 49.607 - - 59.173 - - 105.688 - - - - - 105.688 Logistics - Air Force Communications (AIRCOM) Cost Non Recurring Cost Installation -- BIM - - - 0.000 31 0.000 0.000 0.000 0.000 0.000 - - - 0.000 Subtotal: Non Recurring Cost - - - - - 0.000 - - 0.000 - - 0.000 - - - - - 0.000 - - - - - 0.000 - - 0.000 - - 0.000 - - - - - 0.000 - 35.561 - - 0.713 - - 19.918 - - 20.014 - - - - - 20.014 Subtotal: Logistics - Air Force Communications (AIRCOM) Cost 3 3 3 0.000 Support - Air Force Communications (AIRCOM) Cost PSC - Other Government Costs - LI 835060 - Base Information Transpt Infrast (BITI) ... Air Force UNCLASSIFIED Page 3 of 8 P-1 Line #42 Volume 1 - 483 === page 520 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 835060 / Base Information Transpt Infrast (BITI) Wired Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 5 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Air Force Communications (AIRCOM) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Subtotal: Support - Air Force Communications (AIRCOM) Cost - - 35.561 - - 0.713 - - 19.918 - - 20.014 - - - - - 20.014 Gross/Weapon System Cost - - 457.332 - - 50.320 - - 79.091 - - 125.702 - - - - - 125.702 Remarks: Note: Unit Cost varies significantly depending on the size of the installation (†) indicates the presence of a P-5a LI 835060 - Base Information Transpt Infrast (BITI) ... Air Force UNCLASSIFIED Page 4 of 8 P-1 Line #42 Volume 1 - 484 === page 521 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 5 FY Contractor and Location BIM 2024 TBD/Multiple / Multiple Various Hanscom AFB Jul 2025 Jan 2026 29 4.567 Y BIM 2025 TBD/Multiple / Multiple Various Hanscom AFB Mar 2026 Sep 2026 31 1.458 Y BIM 2026 TBD/Multiple / TBD Various Hanscom AFB Apr 2026 Oct 2026 22 2.690 Y 2027 TBD/Multiple / TBD Various Hanscom AFB Oct 2026 Apr 2027 23 4.595 Y (†) BIM (†) Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: Air Force Communications (AIRCOM) Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 835060 / Base Information Transpt Infrast (BITI) Wired Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date Mar 2025 indicates the presence of a P-21 LI 835060 - Base Information Transpt Infrast (BITI) ... Air Force UNCLASSIFIED Page 5 of 8 P-1 Line #42 Volume 1 - 485 === page 522 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 835060 / Base Information Transpt Infrast (BITI) Wired Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Air Force Communications (AIRCOM) Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Fiscal Year 2026 Calendar Year 2025 Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E BIM Prior Years Deliveries: 38 1 2027 AF 23 0 23 23 LI 835060 - Base Information Transpt Infrast (BITI) ... Air Force UNCLASSIFIED Page 6 of 8 P-1 Line #42 Volume 1 - 486 === page 523 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 835060 / Base Information Transpt Infrast (BITI) Wired Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Air Force Communications (AIRCOM) Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT O C T 0 A - Fiscal Year 2028 Calendar Year 2027 N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P M A Y J U N J U L A U G S E P B A L A N C E BIM Prior Years Deliveries: 38 1 2027 AF 23 23 O C T N O V D E C LI 835060 - Base Information Transpt Infrast (BITI) ... Air Force J A N F E B M A R 1 A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 8 S E P 1 O C T N O V D E C J A N F E B P-1 Line #42 M A R 1 A P R 20 Volume 1 - 487 === page 524 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 835060 / Base Information Transpt Infrast (BITI) Wired Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 5 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: Air Force Communications (AIRCOM) Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 TBD/Multiple - TBD MSR For 2027 1-8-5 For 2027 MAX For 2027 3 3 3 ALT Prior to Oct 1 ALT After Oct 1 1 Reorder Manufacturing PLT 1 6 Total After Oct 1 ALT Prior to Oct 1 7 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 835060 - Base Information Transpt Infrast (BITI) ... Air Force UNCLASSIFIED Page 8 of 8 P-1 Line #42 Volume 1 - 488 0 === page 525 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 835080 / AFNET Equip / BSA 5: Air Force Communications ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0208088F, 0303089F, 0303112F Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 65.730 66.927 68.265 - 413.104 413.104 413.104 132.507 132.507 132.507 282.907 282.907 282.907 325.839 325.839 325.839 - 325.839 325.839 325.839 216.575 216.575 216.575 To FY 2031 Complete - - - - 65.730 66.927 68.265 - - - - - 65.730 66.927 68.265 - Total 1,571.854 1,571.854 1,571.854 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: PE 0303089F, CYBERSPACE OPERATIONS SYSTEMS Air Force Network (AFNET) provides Commercial Off-The-Shelf (COTS) solutions to implement, deliver, and upgrade the information technology (IT) equipment and technology (e.g., firewalls, routers, servers etc.) that constitutes the Air Force's Wide Area Network (WAN). The systems procured in this budget line provide the equipment and technology for Air Force Information Network Operations (AFINOps), which includes technology for network defense. This program includes the defense in depth cybersecurity capabilities critical to protecting Air Force Information Network (AFIN) data and the Air Force strategic entry points into the DoD Information Network (DODIN). This PE executes requirements for both Air Force Intranet Control (AFINC) and Cyberspace Security and Control System (CSCS) weapon systems. Funds may be used for other AFNET requirements if required. (1) AIR FORCE INTRANET CONTROL (AFINC): Procures and installs equipment for network operations, network defense and overall management of the AFNET Gateways (GWs), the Information Management Suite (IMS) and the base Service Delivery Point Routers as well as the Air Force discrete requirements associated with AFNET cybersecurity and will implement in accordance with Zero Trust principles. (2) CYBERSPACE SECURITY AND CONTROL SYSTEM (CSCS): Procures, installs, and hosts capabilities contributing to cyber mission assurance, including proactive defense and persistent network operations for the Air Force, the Air Force-provisioned portions of the DoD Information Network (DoDIN), and the Air Force Information Network (AFIN). CSCS modifications support the following activities: fault resolution to maintain operational capabilities; lead-in coordination activities at base-level Network Control Centers for necessary network security actions; monitoring of AF network services; managing of boundary protection devices and the Air Force network infrastructure; and continuous network situational awareness. The procurement efforts in this program budget line include, but are not limited to, system equipment, engineering/integration, certification and accreditation, deployment, testing, training equipment/systems, associated training and interim contractor support. All activities may incorporate support to other program elements across the Air Force Information Enterprise in accordance with Secretary of the Air Force, Chief Information Officer's direction. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 835080 - AFNET Air Force UNCLASSIFIED Page 1 of 8 P-1 Line #43 Volume 1 - 489 === page 526 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 835080 / AFNET Equip / BSA 5: Air Force Communications ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0208088F, 0303089F, 0303112F Line Item MDAP/MAIS Code: N/A Funding for this exhibit is contained in PE 0303089F. LI 835080 - AFNET Air Force UNCLASSIFIED Page 2 of 8 P-1 Line #43 Volume 1 - 490 === page 527 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 835080 / AFNET Equip / BSA 5: Air Force Communications ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0208088F, 0303089F, 0303112F Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Cyberspace Operations Systems P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 413.104 - / 132.507 - / 282.907 - / 325.839 - / - - / 325.839 - / 413.104 - / 132.507 - / 282.907 - / 325.839 - / - - / 325.839 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: PE 0303089F, CYBERSPACE OPERATIONS SYSTEMS The FY2027 AFNET funding increase is required to modernize and refresh the DAF's Wide Area Network (WAN), securely connecting all 187 DAF Main Operating Bases (MOBs) and all associated Geographically Separated Units (GSUs) around the globe, through equipment procured for the AFINC and CSCS Weapon Systems (WS). The AFINC WS will procure Next Generation Gateway (NGG) equipment to modernize 103 DAF locations. The CSCS WS will create a standardized baseline between NIPR and SIPR networks for more efficient network operations management and install equipment at 67 DAF locations while also prioritizing new technologies that will enhance capabilities and reduce lifecycle costs. DoW mandates the DAF's full implementation and compliance with Zero Trust cybersecurity capabilities by the end of FY2027. The AFINC WS will procure and install remaining Zero Trust Resource Protection Suites to expand full capability to all 187 DAF Bases, including but not limited to procurement of modernized routers, firewalls, hosting infrastructure and associated equipment. Additionally, the data transport infrastructure enabling the DAF's classified and unclassified logical networks (CSCS) also requires modernization, to ensure secure connections between devices operating on the networks and enable day-today network operations throughout the DAF. The AFNET PE provides a singular capability for the DAF that cannot be logically separated without degrading the DAF network for all users. Funding fluctuations are a result of end-of-life equipment replacements, and current modernization efforts to continue providing network defense capabilities. Each of the 187 DAF MOBs has a unique equipment requirement based on its complexity. Overall equipment quantities for AFNET end-items will shift over the FYDP as equipment is replaced or modernized. AFINC includes, but is not limited to, Gateway e-mail security/DNS upgrades, Dual Path Resiliency, Enclave NIPR Firewall and ASIM Sustainment (ENFASS) (previously under Air Force Cyberspace Defense (ACD)), base boundaries, SDP Router tech refresh, Information Management System Expansions, and Next Generation Gateway. CSCS includes, but is not limited to, Vulnerability Management, Area Processing Center and Regional Data Center Consolidations, Installation Service Nodes (ISNs), Comply-to-Connect, and Host Based Security System (HBSS). LI 835080 - AFNET Air Force UNCLASSIFIED Page 3 of 8 P-1 Line #43 Volume 1 - 491 === page 528 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 835080 / AFNET Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 5 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Cyberspace Operations Systems MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 - Gross/Weapon System Cost ($ in Millions) - 413.104 Less PY Advance Procurement ($ in Millions) 132.507 - Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) 325.839 - - - 282.907 325.839 - 325.839 - 132.507 FY 2027 Total - - 282.907 - 413.104 - - 132.507 - Total Obligation Authority ($ in Millions) FY 2027 OOC - 282.907 - 413.104 FY 2027 Base - 325.839 - 325.839 - - 325.839 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Cyberspace Operations Systems Cost Recurring Cost AFINC/CSCS WS (†) MODS Subtotal: Recurring Cost Subtotal: Hardware Cyberspace Operations Systems Cost 82.621 5 413.104 119.096 1 119.096 268.850 1 268.850 314.739 1 314.739 - - - 314.739 1 314.739 - - 413.104 - - 119.096 - - 268.850 - - 314.739 - - - - - 314.739 - - 413.104 - - 119.096 - - 268.850 - - 314.739 - - - - - 314.739 Support - Cyberspace Operations Systems Cost PMA Contractor Services - - - - - 12.761 - - 13.382 - - 10.400 - - - - - 10.400 PMA Other Government Costs - - - - - 0.650 - - 0.675 - - 0.700 - - - - - 0.700 Subtotal: Support Cyberspace Operations Systems Cost - - - - - 13.411 - - 14.057 - - 11.100 - - - - - 11.100 Gross/Weapon System Cost - - - - 132.507 - - 282.907 - - 325.839 - - - - - 325.839 (†) 413.104 indicates the presence of a P-5a LI 835080 - AFNET Air Force UNCLASSIFIED Page 4 of 8 P-1 Line #43 Volume 1 - 492 === page 529 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 5 O O C Item Number / Title [DODIC]: Cyberspace Operations Systems FY Contractor and Location Method/Type or Funding Vehicle AFINC/CSCS WS MODS 2024 Multiple / Multiple Various Hanscom AFB May 2024 Jul 2024 1 139.671 Y Feb 2024 AFINC/CSCS WS MODS 2025 Multiple / Multiple Various Hanscom AFB Mar 2025 May 2025 1 119.096 Y Feb 2025 (†) 2026 Multiple / Multiple Various Hanscom AFB Feb 2026 Apr 2026 1 268.850 Y Jan 2026 (†) 2027 Multiple / TBD Various Hanscom AFB Feb 2027 Apr 2027 1 314.739 Y Cost Elements AFINC/CSCS WS MODS AFINC/CSCS WS MODS (†) P-1 Line Item Number / Title: 835080 / AFNET Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 835080 - AFNET Air Force UNCLASSIFIED Page 5 of 8 P-1 Line #43 Volume 1 - 493 === page 530 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 835080 / AFNET Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Cyberspace Operations Systems Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Fiscal Year 2025 Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E AFINC/CSCS WS MODS Prior Years Deliveries: 4 1 2026 AF 1 0 1 2 2027 AF 1 0 1 1 1 O C T LI 835080 - AFNET Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 8 S E P O C T N O V D E C J A N F E B P-1 Line #43 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 494 === page 531 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 835080 / AFNET Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Cyberspace Operations Systems Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Fiscal Year 2027 Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E AFINC/CSCS WS MODS Prior Years Deliveries: 4 1 2026 AF 1 0 1 2 2027 AF 1 0 1 A - 1 0 A - O C T LI 835080 - AFNET Air Force - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 8 S E P O C T N O V D E C J A N F E B P-1 Line #43 M A R 1 A P R 0 M A Y J U N J U L A U G S E P Volume 1 - 495 === page 532 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 835080 / AFNET Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 5 Item Number / Title [DODIC]: Cyberspace Operations Systems Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 1 1 1 Multiple - Multiple 2 Multiple - TBD ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 0 0 0 0 0 0 0 0 1 5 2 7 0 0 0 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 835080 - AFNET Air Force UNCLASSIFIED Page 8 of 8 P-1 Line #43 Volume 1 - 496 === page 533 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 835110 / Joint Communications Support Element (JCSE) Equip / BSA 5: Air Force Communications ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0207422F Other Related Program Elements: 0207442F Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 5.380 5.821 5.930 16.267 - 16.267 16.704 16.982 17.108 17.503 - - - - - - - - - - - - 5.380 5.821 5.930 16.267 - 16.267 16.704 16.982 17.108 17.503 - - - - - - - - - - - - 5.380 5.821 5.930 16.267 - 16.267 16.704 16.982 17.108 17.503 - Total 101.695 101.695 101.695 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: JOINT COMMUNICATION SUPPORT ELEMENT (JCSE): Aligned under Joint Enabling Capabilities Command (JECC), US Transportation Command (USTRANSCOM) - is the Department of War's sole joint communications unit dedicated to supporting All-Domain Forces. A crisis response organization, JCSE develops technical solutions for modern military communications challenges. Its Modernization Program, provides life-cycle recapitalization of essential mission equipment. Authorized by the Director, Joint Staff, this unique program has enabled JCSE to modernize tactical Command, Control, Communications, Computers and Intelligence (C4I) systems with emerging technologies. This program is the key enabler that allows JCSE the mission flexibility to rapidly purchase, integrate, and field government and commercial off-the-shelf equipment to evolve and provide technical solutions to overcome tactical communication gaps. The Modernization Program, a non-program-of-record, provides JCSE the agility to procure cutting-edge technologies, adapt them for military use, and maintain a technological advantage. To ensure relevance and effectiveness, the Joint Enabling Capabilities Command (JECC) conducts program reviews with Combatant Commanders and Military Departments twice a year. These reviews serve multiple purposes: informing the joint force about emerging capabilities and their alignment with operational requirements; updating Military Departments on progress, and keeping the communication and innovation communities abreast of JCSE projects to encourage collaboration and unified solutions. Monthly procurement status reports are submitted to United States Transportation Command (USTRANSCOM), the organization tasked with overall responsibility of the JCSE Modernization Program. This comparatively small investment delivers substantial value to the Department of War by enabling JCSE to quickly validate concepts and technologies for joint warfighters, fill service capability gaps, and provide effective crisis support. JCSE is a vital component of numerous major contingency plans, including Homeland Defense and those addressing National Defense priorities. Moreover, JCSE maintains a comprehensive 24/7 reachback capability via its Global Enterprise Network, managed through its Global Network Operations Center (GNOC), providing access to a wide array of DOW and commercial networks. In FY2027, there is a budget neutral consolidation of Service JCSE funding into 835110. This is a budget neutral consolidation, not new spending: The $10 million increase in the Air Force's budget is a direct transfer of funds previously programmed by the Army and Navy. This is a zero-sum change for the Department of War, not an increase in overall spending. This consolidation is the result of a collaborative effort between USTRANSCOM, the Army, the Navy, and the Air Force to improve a vital joint capability. The Services are not withdrawing from the program; they are simply streamlining its management. Consolidating the procurement funding under a single service—the Air Force—streamlines program oversight, reduces administrative overhead, and allows for more efficient use of taxpayer dollars. Funding for this exhibit is contained in PE 0207422F, Deployable Command Control and Communications Systems. LI 835110 - Joint Communications Support Element (JC... Air Force UNCLASSIFIED Page 1 of 4 P-1 Line #44 Volume 1 - 497 === page 534 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 835110 / Joint Communications Support Element (JCSE) Equip / BSA 5: Air Force Communications ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0207422F Other Related Program Elements: 0207442F Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Joint Communications Support Element (JCSE) P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a B MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 5.380 - / 5.821 - / 5.930 - / 16.267 - / - - / 16.267 - / 5.380 - / 5.821 - / 5.930 - / 16.267 - / - - / 16.267 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Fiscal Year (FY) 2027 base funding procures communications equipment in concert with strategic planning guidance, Combined Joint All Domain Command and Control, Department of War Chief Information Strategy, and Combatant Commands Joint Task Force capability requests. Funding is allocated for the procurement of critical technologies aimed at modernizing tactical systems and enhancing overall mission effectiveness. A key priority is to sustain the mission by using these funds to acquire next-generation tactical infrastructure, including advanced power and environmental control systems. This investment will also maintain the mission at the operational edge by providing a secure Multi-domain Virtual Desktop Environment for reliable data storage and hosting. To enhance mission continuity, the FY2027 budget will procure Software-Defined Network tools, ensuring resilient network availability even in contested environments. Furthermore, the funding will diversify and protect the mission through the acquisition of secure communication links, such as software-defined and protected SATCOM modems, along with next-generation cryptography. To fortify mission security, the budget provides for Zero Trust Identity, Credential, and Access Management (ICAM) tools, establishing a robust cybersecurity posture. Finally, to accelerate mission tempo, these funds will be used to procure auto-provisioning tools that employ orchestration and automation, significantly improving the speed and efficiency of key operational tasks. In FY2027, There is a budget neutral consolidation of Service JCSE funding into 835110. This is a budget neutral consolidation, Not New Spending: The $10 million increase in the Air Force's budget is a direct transfer of funds previously programmed by the Army and Navy. This is a zero-sum change for the Department of War, not an increase in overall spending. This consolidation is the result of a collaborative effort between USTRANSCOM, the Army, the Navy, and the Air Force to improve a vital joint capability. The Services are not withdrawing from the program; they are simply streamlining its management. Enhancing Efficiency and Oversight: Consolidating the procurement funding under a single service—the Air Force—will streamline program oversight, reduce administrative overhead, and allow for more efficient use of taxpayer dollars. LI 835110 - Joint Communications Support Element (JC... Air Force UNCLASSIFIED Page 2 of 4 P-1 Line #44 Volume 1 - 498 === page 535 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 835110 / Joint Communications Support Element (JCSE) Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 5 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: Joint Communications Support Element (JCSE) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 5.380 5.821 5.930 16.267 - 16.267 - - - - - - 5.380 5.821 5.930 16.267 - 16.267 - - - - - - 5.380 5.821 5.930 16.267 - 16.267 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Joint Communications Support Element (JCSE) Cost Recurring Cost (†) 5.380 5.821 5.821 5.930 5.930 16.267 16.267 - - - 16.267 Subtotal: Recurring Cost - - 5.380 - - 5.821 - - 5.930 - - 16.267 - - - - - 16.267 Subtotal: Hardware - Joint Communications Support Element (JCSE) Cost - - 5.380 - - 5.821 - - 5.930 - - 16.267 - - - - - 16.267 Gross/Weapon System Cost - - 5.380 - - 5.821 - - 5.930 - - 16.267 - - - - - 16.267 Hardware 5.380 1 1 1 1 1 16.267 Remarks: In FY27, There is a budget neutral consolidation of Service JCSE funding into 835110. This is a Budget Neutral Consolidation, Not New Spending: The ~10 million increase in the Air Force's budget is a direct transfer of funds previously programmed by the Army and Navy. This is a zero-sum change for the Department of War, not an increase in overall spending. (†) indicates the presence of a P-5a LI 835110 - Joint Communications Support Element (JC... Air Force UNCLASSIFIED Page 3 of 4 P-1 Line #44 Volume 1 - 499 === page 536 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 5 Location of PCO Award Date Date of First Delivery Item Number / Title [DODIC]: Joint Communications Support Element (JCSE) FY Contractor and Location Method/Type or Funding Vehicle Hardware 2024 N/A / MacDill AFB Various AMC Jan 2024 May 2025 1 5.380 N Oct 2023 Jan 2024 Hardware 2025 N/A / MacDill AFB Various AMC Jan 2025 May 2026 1 5.821 N Dec 2024 Jan 2025 Hardware 2026 N/A / MacDill AFB Various AMC Jan 2026 May 2027 1 5.930 N Dec 2025 Jan 2026 Hardware 2027 N/A / MacDill AFB Various AMC Jan 2027 May 2028 1 16.267 N Dec 2026 Jan 2027 Cost Elements O O C P-1 Line Item Number / Title: 835110 / Joint Communications Support Element (JCSE) Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date Remarks: This is a Budget Neutral Consolidation, Not New Spending: The 10 million increase in the Air Force's budget is a direct transfer of funds previously programmed by the Army and Navy. This is a zero-sum change for the Department of War, not an increase in overall spending. LI 835110 - Joint Communications Support Element (JC... Air Force UNCLASSIFIED Page 4 of 4 P-1 Line #44 Volume 1 - 500 === page 537 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 835140 / USCENTCOM Equip / BSA 5: Air Force Communications ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Procurement Quantity (Units in Each) - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 20.698 14.919 15.328 - 15.328 15.657 15.858 16.171 16.495 - Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 20.698 14.919 15.328 - 15.328 15.657 15.858 16.171 16.495 - Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 20.698 14.919 15.328 - 15.328 15.657 15.858 16.171 16.495 - Total 115.126 115.126 115.126 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: PE 0201122F US Central Command (USCENTCOM) COMMUNICATIONS USCENTCOM directs and enables military operations and activities with allies and partners to increase regional security and stability in support of enduring U.S interests and countering violent extremist organizations, competing strategically. The Middle East is an area facing ongoing challenges from regional instability and violent extremists, making USCENTCOM's mission essential to mitigating Direct War Enduring Costs (DWEC). Procurement funding for PE 0201122F focuses on upgrading USCENTCOM's Command and Control (C2) Systems to maintain this critical information advantage. This includes replacing end-of-life C2 systems (thin clients, servers, etc.), Joint Information Environment (JIE) infrastructure, and classified and unclassified voice, data, and video dissemination systems. A key component of this upgrade involves modernizing Storage Area Network (SAN) infrastructure and bolstering mission partner networks. This includes, but is not limited to, the CENTCOM Partner Network (CPN), CENTCOM Partner Network Episodic (CPN-X), and Mission Partner Environment Information System (MPE-IS). These secure networks facilitate bilateral and multilateral information sharing up to the SECRET RELEASABLE level with coalition partners. USCENTCOM J6 requires sustained investment to deliver secure, resilient, and innovative IT services that enable operational advantage, strengthen coalition partnerships, and pre-serve freedom of action in the information domain. To further enhance C4 capabilities, procurement funding will also transition USCENTCOM's communication architecture to the Command's Collaborative Partner Environment (CPE). The CPE provides seamless access to data and applications across multiple devices and networks, directly enabling USCENTCOM's C2 capabilities and supports the accelerated decision-making and targeting cycles envisioned by the Combined Joint All Domain Command and Control (CJADC2) concepts. Funding for this exhibit contained in PE 0201122F. PE 0201131F Service Support to USCENTCOM - Communications LI 835140 - USCENTCOM Air Force UNCLASSIFIED Page 1 of 5 P-1 Line #45 Volume 1 - 501 === page 538 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 835140 / USCENTCOM Equip / BSA 5: Air Force Communications ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A This PE, also known as US Air Force Central (AFCENT) Communications, is a Service Component Command (SCC) directly supporting USCENTCOM air operations in their deployed theaters. The success of both USCENTCOM and AFCENT within this complex Area of Responsibility (AOR) relies heavily on robust C4 systems. These systems are crucial for achieving full-spectrum information superiority, enabling air domain awareness, and securing expeditionary bases and locations. The funding for this PE focuses on procuring and modernizing critical Command, Control, Communications and Computers (C4) systems. This includes replacing end-of-life Command & Control (C2) systems that enable air domain awareness, implementing zero-trust architecture and cloud-based IT management, and upgrading classified and unclassified voice, data, and video storage and dissemination systems. Funding for this exhibit contained in PE 0201131F. LI 835140 - USCENTCOM Air Force UNCLASSIFIED Page 2 of 5 P-1 Line #45 Volume 1 - 502 === page 539 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 835140 / USCENTCOM Equip / BSA 5: Air Force Communications ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 USCENTCOM Communications A - / - - / 5.758 - / 6.638 - / 6.852 - / - - P-5 Service Support to USCENTCOM - Communications A - / - - / 14.940 - / 8.281 - / 8.476 - / - - / 6.852 / 8.476 P-40 Total Gross/Weapon System Cost - / - - / 20.698 - / 14.919 - / 15.328 - / - - / 15.328 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: PE 0201122F US Central Command (USCENTCOM) Communications In FY 2027, USCENTCOM will transition from development to full operational capability of the Collaborative Partner Environment (CPE) with mission partners, enabling innovation, collaboration, and data-driven operations across USCENTCOM's coalition environment. Leveraging MAVEN Rel capabilities, CPE will empower partners with secure, scalable, and real-time access to mission relevant data. CPE also allows for accelerated operational decision-making while maintaining strict adherence to Zero Trust security and Identity, Credential, and Access Management (ICAM) standards. Investment in FY 2027 will also support enhanced resiliency in communication efforts, ensuring Information Technology (IT) services and Command and Control (C2) remain uninterrupted in all conditions, including contested cyber environments, severe weather events, or wartime scenarios. The CPE also aligns USCENTCOM's hybrid multi-cloud environment with DoW enterprise modernization strategies. PE 0201131F Service Support to USCENTCOM Communication In FY 2027 procurement funds for Service Support to USCENTCOM focus on modernizing key infrastructure and capabilities across the AOR. The Datalink communications network, crucial for maintaining air domain awareness across the AOR, requires advancement to comply with mandates from the National Security Agency, National Telecommunications and Information Agency, as well as Federal Aviation Agency for Crypto Modernization (including frequency remapping). Securing data usage across domains to expedite open-source intelligence, diverse data sources, and invest in UAS mission execution is an investment integral for mission assurance and warfighter advancement. For consistent communications, portable satellite communications systems integrated into specific mission areas will be paramount. Regarding Force Protection and Security evolution, security scanner communication devices will continue to offer a blanket of protection to protect lives in harm's way. Additional touchpoints with FY 2027 procurement funds involve radio and heightened comms, frequency bands dependent upon intended applications (VHF, UHF, etc.), antenna with varieties of improved ranges and signals, PTT adapters, weather-resistance cases and transportation equipment, as well as encryption modules for secure communications. Lastly, investing in Communications Container Weapons Systems as mechanisms inside standard intermodal shipping containers will enable covert transportation and deployment for advanced mobility and flexibility. LI 835140 - USCENTCOM Air Force UNCLASSIFIED Page 3 of 5 P-1 Line #45 Volume 1 - 503 === page 540 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 835140 / USCENTCOM Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 5 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: USCENTCOM Communications MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 5.758 6.638 6.852 - 6.852 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 5.758 6.638 6.852 - 6.852 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 5.758 6.638 6.852 - 6.852 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - USCENTCOM Communications Cost Recurring Cost USCENTCOM Collaborative Partner and Cloud Computing Environments - - - 5.758 Subtotal: Recurring Cost - - - - - - - - - Subtotal: Support - USCENTCOM Communications Cost - Gross/Weapon System Cost - Subtotal: Hardware - USCENTCOM Communications Cost 1 5.758 4.638 - 5.758 - - - 5.758 - - - - - 2.000 - - - - - - - - - - 5.758 - 1 4.638 4.852 - 4.638 - - 4.638 - 2.000 2.000 - 2.000 - - 6.638 - 1 4.852 - - - 4.852 1 4.852 - 4.852 - - - - - 4.852 - 4.852 - - - - - 4.852 2.000 - - - 2.000 - 2.000 - - - - - 2.000 - 6.852 - - - - - 6.852 Support - USCENTCOM Communications Cost Sustain and Transition Mission Partner Environment (MPE) Networks LI 835140 - USCENTCOM Air Force 1 UNCLASSIFIED Page 4 of 5 1 P-1 Line #45 1 2.000 Volume 1 - 504 === page 541 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 835140 / USCENTCOM Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 5 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Service Support to USCENTCOM Communications MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 14.940 8.281 8.476 - 8.476 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 14.940 8.281 8.476 - 8.476 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 14.940 8.281 8.476 - 8.476 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Support - Service Support to USCENTCOM - Communications Cost Command, Control, Communications, Computers, and Intelligence (C4I) Infrastructure Modernization - - - 14.940 Datalink/ISR Communications Systems/Sensors - - - - Communications Protective Measures - - - Subtotal: Support - Service Support to USCENTCOM Communications Cost - - Gross/Weapon System Cost - - LI 835140 - USCENTCOM Air Force 1 14.940 3.681 1 3.681 3.798 1 3.798 - - - 3.798 1 3.798 - - 2.400 1 2.400 2.478 1 2.478 - - - 2.478 1 2.478 - - - 2.200 1 2.200 2.200 1 2.200 - - - 2.200 1 2.200 - - - 14.940 - - 8.281 - - 8.476 - - - - - 8.476 - - - 14.940 - - 8.281 - - 8.476 - - - - - 8.476 UNCLASSIFIED Page 5 of 5 P-1 Line #45 Volume 1 - 505 === page 542 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 506 === page 543 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 835160 / USSTRATCOM Equip / BSA 5: Air Force Communications ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0303255F Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 4.797 4.788 5.013 - 5.013 5.125 5.227 5.311 5.417 - 35.678 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 4.797 4.788 5.013 - 5.013 5.125 5.227 5.311 5.417 - 35.678 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 4.797 4.788 5.013 - 5.013 5.125 5.227 5.311 5.417 - 35.678 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: USSTRATCOM procurement funding supports lifecycle management for Nuclear Command Control (NC2) Systems at USSTRATCOM Headquarters, remote locations, and platforms. LI 835160 - USSTRATCOM Air Force UNCLASSIFIED Page 1 of 7 P-1 Line #46 Volume 1 - 507 === page 544 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 835160 / USSTRATCOM Equip / BSA 5: Air Force Communications ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0303255F Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Command, Control, Communication, and Computers (C4) STRATCOM P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 4.797 - / 4.788 - / 5.013 - / - - / 5.013 - / - - / 4.797 - / 4.788 - / 5.013 - / - - / 5.013 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The COMMAND, CONTROL, COMMUNICATION, AND COMPUTERS (C4) funding supports lifecycle management of USSTRATCOM Headquarters, remote locations, and platforms. LI 835160 - USSTRATCOM Air Force UNCLASSIFIED Page 2 of 7 P-1 Line #46 Volume 1 - 508 === page 545 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 835160 / USSTRATCOM Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 5 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Command, Control, Communication, and Computers (C4) - STRATCOM MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 4.797 4.788 5.013 - 5.013 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 4.797 4.788 5.013 - 5.013 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 4.797 4.788 5.013 - 5.013 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Command, Control, Communication, and Computers (C4) - STRATCOM Cost Recurring Cost (†) - - - 4.797 4.797 4.788 4.788 5.013 5.013 - - - 5.013 - - - - - 4.797 - - 4.788 - - 5.013 - - - - - 5.013 Subtotal: Hardware Command, Control, Communication, and Computers (C4) STRATCOM Cost - - - - - 4.797 - - 4.788 - - 5.013 - - - - - 5.013 Gross/Weapon System Cost - - - - - 4.797 - - 4.788 - - 5.013 - - - - - 5.013 NC2 Lifecycle Subtotal: Recurring Cost 1 1 1 1 5.013 Remarks: The COMMAND, CONTROL, COMMUNICATION, AND COMPUTERS (C4) - STRATCOM exhibit supports lifecycle management of Nuclear Command Control (NC2) Systems and platforms. Detailed information is classified; additional information will be provided on a need to know basis. (†) indicates the presence of a P-5a LI 835160 - USSTRATCOM Air Force UNCLASSIFIED Page 3 of 7 P-1 Line #46 Volume 1 - 509 === page 546 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 5 FY Contractor and Location (†) 2025 Various / Various Reqn ACC Mar 2025 Mar 2026 1 4.797 Y (†) 2026 Various / Various Reqn ACC Mar 2026 Mar 2027 1 4.788 Y (†) 2027 Various / Various Reqn ACC Mar 2027 Mar 2028 1 5.013 Y NC2 Lifecycle NC2 Lifecycle NC2 Lifecycle (†) Item Number / Title [DODIC]: Command, Control, Communication, and Computers (C4) - STRATCOM Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 835160 / USSTRATCOM Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 835160 - USSTRATCOM Air Force UNCLASSIFIED Page 4 of 7 P-1 Line #46 Volume 1 - 510 === page 547 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 835160 / USSTRATCOM Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Command, Control, Communication, and Computers (C4) - STRATCOM Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P NC2 Lifecycle 1 2025 AF 1 0 1 1 2026 AF 1 0 1 1 2027 AF 1 0 1 A - - - - - - - - - - - 1 0 A - - - - - - - 1 1 O C T LI 835160 - USSTRATCOM Air Force - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 5 of 7 S E P O C T N O V D E C J A N F E B P-1 Line #46 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 511 === page 548 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 835160 / USSTRATCOM Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Command, Control, Communication, and Computers (C4) - STRATCOM Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E NC2 Lifecycle 1 2025 AF 1 1 0 1 2026 AF 1 0 1 1 2027 AF 1 0 1 0 - - - - 1 0 A O C T LI 835160 - USSTRATCOM Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 7 S E P O C T N O V D E C J A N F E B P-1 Line #46 1 M A R 0 A P R M A Y J U N J U L A U G S E P Volume 1 - 512 === page 549 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 835160 / USSTRATCOM Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 5 Item Number / Title [DODIC]: Command, Control, Communication, and Computers (C4) - STRATCOM Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 1 1 1 Various - Various ALT Prior to Oct 1 ALT After Oct 1 1 Reorder Manufacturing PLT 6 12 Total After Oct 1 ALT Prior to Oct 1 18 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 835160 - USSTRATCOM Air Force UNCLASSIFIED Page 7 of 7 P-1 Line #46 Volume 1 - 513 0 === page 550 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 514 === page 551 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 835210 / USSPACECOM Equip / BSA 5: Air Force Communications ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - Procurement Quantity (Units in Each) - - - Gross/Weapon System Cost ($ in Millions) - 79.783 32.633 Less PY Advance Procurement ($ in Millions) - - - Net Procurement (P-1) ($ in Millions) - 79.783 32.633 Plus CY Advance Procurement ($ in Millions) - - - Total Obligation Authority ($ in Millions) - 79.783 32.633 195.370 195.370 195.370 - 195.370 195.370 195.370 233.315 233.315 233.315 129.371 129.371 129.371 1,133.429 1,133.429 1,133.429 To FY 2031 Complete 915.497 915.497 915.497 Total - 2,719.398 - 2,719.398 - 2,719.398 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: United States Space Command (USSPACECOM) procurement is essential to operationalize two critical USSPACECOM facilities, ensuring our nation can deter conflict and secure superiority in the space domain. Procurement is required for the crucial fit-out of the Combined Space Operations Facility (CSOF) at Schriever SFB and the USSPACECOM headquarters Command and Control Facility (C2F) at Redstone Arsenal, AL. The CSOF requires procurement for the necessary mission systems, security infrastructure, and C4I equipment to support the National Space Defense Center's Orbital Warfare mission. The USSPACECOM C2F will equip a foundational, state-of-the-art weapon system that will underpin USSPACECOM's warfighting capabilities. C4IT fit for the C2F provides the environment for rapid decisionmaking and ensuring a superior kill chain against our adversaries. This investment is the bedrock upon which USSPACECOM will build the speed, precision, and decision advantage necessary to defend U.S. vital interests. LI 835210 - USSPACECOM Air Force UNCLASSIFIED Page 1 of 8 P-1 Line #47 Volume 1 - 515 === page 552 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 835210 / USSPACECOM Equip / BSA 5: Air Force Communications ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 USSPACECOM P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 79.783 - / 32.633 - / 195.370 - / - - / 195.370 - / - - / 79.783 - / 32.633 - / 195.370 - / - - / 195.370 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Funding provides the required command specific operational components to complete the Consolidated Space Operations Facility (CSOF) on Schriever, AFB and the Command and Control Facility (C2F) on Redstone Arsenal (RSA), Huntsville, AL. The CSOF supports the Orbital Warfare mission of United States Space Command's subordinate operations center, National Space Defense Center (NSDC), the U.S. Space Forces-Space (S4S) Combined Joint Force Space Component Commander (CJFSCC), and remote site operations for Combined Space Operations Center (CSpOC). The procurement request provides for the MILCON fit-out to enable NSDC to provide decision quality information to support the Commander, USSPACECOM. The facility will house current and future primary and alternate Space C2 systems. It will provide the environment to enable the development of future Space C2 systems and be the prototyping and integration location for USSPACECOM operations centers. Additionally, it will also provide isolated environments for modeling and simulation and as well as a cyber terrain range. The facility will be a critical component of the USSPACECOM C2 Space Warfighting Terrain. FY27 increase provides critical funding to support the relocation of USSPACECOM from Colorado to Alabama, ensuring a seamless transition to its new headquarters. The funding encompasses C4IT Fit-Out of USSPACECOM's C2F along with systems integration to establish a state-of-the-art operational environment, as well as advanced information technology services to maintain mission continuity. The C2F will be a state-of-the-art foundational weapon system that will underpin USSPACECOM's ability to execute its UCP-mandated responsibilities, ensuring mission success. The procurement request will enable USSPACECOM to fight and win in the contested environment of space. The facility will house current and future primary and alternate Space C2 systems and data from all USSPACECOM's component commands. It will provide the environment to enable rapid decision making to enable a superior kill chain beyond that of U.S. adversaries. Additionally, it will also provide isolated and HEMP hardened environments for orbital dynamics, modeling and simulation, and a cyber terrain range. LI 835210 - USSPACECOM Air Force UNCLASSIFIED Page 2 of 8 P-1 Line #47 Volume 1 - 516 === page 553 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 835210 / USSPACECOM Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 5 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: USSPACECOM MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 Procurement Quantity (Units in Each) - - - Gross/Weapon System Cost ($ in Millions) - 79.783 32.633 Less PY Advance Procurement ($ in Millions) - - - Net Procurement (P-1) ($ in Millions) - 79.783 32.633 Plus CY Advance Procurement ($ in Millions) - - - Total Obligation Authority ($ in Millions) - 79.783 32.633 FY 2027 Base FY 2027 OOC - - 195.370 FY 2027 Total - - - 195.370 - 195.370 - - - 195.370 - 195.370 - - 195.370 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - USSPACECOM Cost Non Recurring Cost CSOF Network Procurements - - - 46.581 1 46.581 1.293 1 1.293 1.193 1 1.193 - - - 1.193 1 1.193 - - - 6.491 1 6.491 5.946 1 5.946 5.000 1 5.000 - - - 5.000 1 5.000 CSOF Data Center & Server Room Procurements - - - 18.000 1 18.000 7.485 1 7.485 0.100 1 0.100 - - - 0.100 1 0.100 CSOF C4I/ IT Auditorium Procurements - - - - 0.000 0.524 1 0.524 0.529 1 0.529 - - - 0.529 1 0.529 CSOF Furniture - - - 0.276 1 0.276 0.085 1 0.085 0.085 1 0.085 - - - 0.085 1 0.085 USSPACECOM Modeling and Simulation Lab - - - 1.775 1 1.775 0.855 1 0.855 0.550 1 0.550 - - - 0.550 1 0.550 USSPACECOM Mission Systems - - - 5.284 1 5.284 15.852 1 15.852 0.852 1 0.852 - - - 0.852 1 0.852 USSPACECOM C2F C4IT Fit-Out - - - - - - - - - 33.461 1 33.461 - - - 33.461 1 33.461 C2F Systems Integration - - - - - - - - - 153.600 1 153.600 - - - 153.600 1 153.600 - - - - - 78.407 - - 32.040 195.370 - - - CSOF Operations Center Procurements (†) Subtotal: Non Recurring Cost LI 835210 - USSPACECOM Air Force - UNCLASSIFIED Page 3 of 8 - - P-1 Line #47 - - 195.370 Volume 1 - 517 === page 554 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 835210 / USSPACECOM Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 5 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: USSPACECOM MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost Subtotal: Hardware USSPACECOM Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) - - - - - - - 1.376 Subtotal: Support USSPACECOM Cost - - - - Gross/Weapon System Cost - - - - FY 2026 Total Cost Qty (Each) ($ M) - Unit Cost ($ M) 78.407 - 1.376 0.593 - 1.376 - - 79.783 - FY 2027 Base Total Cost Qty (Each) ($ M) - Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) 32.040 - - 0.593 - - - 0.593 - - - 32.633 - - ($ M) 195.370 FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) - - - - - 195.370 - - - - - - - - - - - - - - - - - - - Support - USSPACECOM Cost Pre-installation Test and Check Out (PITCO) (†) 1 1 195.370 195.370 indicates the presence of a P-5a LI 835210 - USSPACECOM Air Force UNCLASSIFIED Page 4 of 8 P-1 Line #47 Volume 1 - 518 === page 555 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 5 Cost Elements CSOF Operations Center Procurements (†) CSOF Operations Center Procurements (†) CSOF Operations Center Procurements (†) (†) O O C P-1 Line Item Number / Title: 835210 / USSPACECOM Item Number / Title [DODIC]: USSPACECOM FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) 2025 NIWC / Schriever, SFB Various TBD Oct 2024 Sep 2025 1 6.491 Y 2026 NIWC / Schriever, SFB Various TBD Oct 2025 Sep 2026 1 5.946 Y 2027 NIWC / Schriever, SFB Various TBD Oct 2026 Sep 2027 1 5.000 Y Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 835210 - USSPACECOM Air Force UNCLASSIFIED Page 5 of 8 P-1 Line #47 Volume 1 - 519 === page 556 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 835210 / USSPACECOM Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: USSPACECOM Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P CSOF Operations Center Procurements 1 2025 AF 1 0 1 1 2026 AF 1 0 1 1 2027 AF 1 0 1 A - - - - - - - - - - 1 0 A - - - - - - - - - - - 1 0 1 O C T LI 835210 - USSPACECOM Air Force - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 8 S E P O C T N O V D E C J A N F E B P-1 Line #47 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 520 === page 557 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 835210 / USSPACECOM Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: USSPACECOM Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E CSOF Operations Center Procurements 1 2025 AF 1 1 0 1 2026 AF 1 1 0 1 2027 AF 1 0 1 0 0 A O C T LI 835210 - USSPACECOM Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 8 1 S E P 0 O C T N O V D E C J A N F E B P-1 Line #47 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 521 === page 558 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 835210 / USSPACECOM Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 5 Item Number / Title [DODIC]: USSPACECOM Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 NIWC - Schriever, SFB 1 1 1 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 1 Manufacturing PLT 1 Total After Oct 1 11 12 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 835210 - USSPACECOM Air Force UNCLASSIFIED Page 8 of 8 P-1 Line #47 Volume 1 - 522 === page 559 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 837100 / Tactical C-E Equipment Equip / BSA 7: Organization and Base ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0207444F Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 0.000 0.000 0.000 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 139.076 139.076 139.076 145.829 145.829 145.829 162.835 - - 162.835 - - 162.835 - 162.835 162.835 162.835 144.618 144.618 144.618 161.881 161.881 161.881 164.704 164.704 164.704 To FY 2031 Complete 167.996 167.996 167.996 Total - 1,086.939 - 1,086.939 - 1,086.939 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: PE 0207418F TACTICAL AIRBORNE CONTROL SYSTEM EQUIPMENT (TACS): The Tactical Airborne Control System (TACS) provides a Distributed Mission Operations (DMO) capable, high-fidelity simulator for Special Warfare airmen, to include Tactical Air Control Party (TACP), Special Tactics Combat Control Team (CCT), Joint Terminal Attack Controller (JTAC), and Air Support Operations Center (ASOC) operations. The Tactical Airborne Control System (TACS) is essential in providing initial training, mission qualification training, continuation training, and currency control requirements to JTACs and Special Tactics personnel. JTAC control training is the only capability enabling JTACs to achieve and maintain minimum required training for both qualification and proficiency in accordance with the U.S and Partner Nation Memorandum of Agreement for JTAC certification and qualification. Funding for this exhibit is contained in program element (PE) 0207418F. PE 0207422F THEATER-DEPLOYABLE COMMUNICATIONS (TDC) PROGRAM: TDC is used to extend network data, voice and video services to expeditionary and battlefield forces. The TDC system provides stand-alone communications support for the full range of military operations and communications capability for Command and Control (C2) reach back, at and above, the tactical level for a variety of Air Force missions. TDC provides a rapidly deployable communication infrastructure package, which provides deployed users with secure and non-secure voice service, internet access, local area network, network management, information assurance, e-mail services (Non-classified Internet Protocol (IP) Router Network (NIPRNET)/Secret Internet Protocol Router Network (SIPRNET), and intra/inter-base connectivity services like those established on a fixed base. This program element funds both the procurement of large communications packages that support base size operation centers, and smaller communications packages that support smaller units on the move, as well as a wide variety of contingency operations in austere/isolated locations. The TDC packages also support Special Missions, to include noncombatant evacuation and disaster relief efforts, US Secret Service support, and Homeland Defense Operations. The Flexible Communications Package (FCP) consists of Satellite Communications (SATCOM), Integrated Communications Package (ICAP) and Network Control Center-Deployed (NCC-D) components. The Agile Communications Packages (ACP) or Fly Away Communications Terminal (FACT) (FACT is a partial ACP), will replace both the Communication Fly away kit and the Small Communications Package (SCP) and provide the Wing Communications Squadrons with communications to meet expeditionary operations requirements. The ACP baseband hardware will also replace the FCP NCC-D and Colorless core hardware so the program will have a single hardware baseline. The ACP will consist of ICAP and SATCOM capable equipment to provide a complete package to wing and combat communications squadrons that will allow for success of Agile Combat Employment (ACE). The TDC program reached full operational capability in 2008. TDC procures and installs end of life/end of support equipment to maintain full operational capability. Recapitalization addresses Diminishing Manufacturing Sources (DMS) issues associated with Commercial off the Shelf (COTS) components and ensures TDC maintains compliance with security mandates/directives and cryptographic standards. LI 837100 - Tactical C-E Equipment Air Force UNCLASSIFIED Page 1 of 27 P-1 Line #48 Volume 1 - 523 === page 560 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 837100 / Tactical C-E Equipment Equip / BSA 7: Organization and Base ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0207444F Line Item MDAP/MAIS Code: N/A Theater-Deployable Communications (TDC) procurements consist of Satellite Communications (SATCOM), Integrated Communications Package (ICAP) and Network Control Center- Deployed (NCC-D) components. Recapitalization cost is based on the quantity of equipment, number of users they support, and the configurations of the three components. Size of recapitalization packages vary from year to year. a. SATCOM (formerly HUB AND SPOKE SATELLITE TERMINALS): Satellite terminals provide two-way communications connectivity between expeditionary bases and reach back, through Defense Information System Agency (DISA) gateways/teleports, to the global information grid. These terminals provide Department of War (DoW) X band and Ka Band (Super High Frequency) resources. They provide access to Ku band commercial satellite services and commercial Low Earth Orbit (LEO) terminals allow connectivity through an alternate constellation. TDC's Small, Medium, and LEO satellite terminals improve the expeditionary workforce's bandwidth throughput for high-speed voice, data, video, and imagery transmissions. Small aperture SATCOM terminals supporting direct internet protocol connection capable of supporting multi-commercial and military transmission bands significantly reduce airlift requirements and provide flexibility during expeditionary operations. b. INTEGRATED COMMUNICATIONS ACCESS PACKAGE (ICAP): ICAP provides the distributed base backbone which includes hubs/routers, switches, secure/non-secure telephones capability, secure conferencing, WI-FI and timing equipment, and intra-base connectivity using fiber and/or point-to-point and point to multi-point radios to provide NIPR/SIPR connectivity around the deployed base. ICAP packages include accessories and configuration kits to tailor the capability of voice and data modules (i.e., cards to interface to the host nation postal telegraph and telephone). ICAP packages are modular, which allows assets to be deployed incrementally and provides the capability to expand the network as the base population increases. TDC provides a rapidly deployable communication infrastructure package, which provides deployed users with secure and non-secure voice service, internet access, local area network, network management, information assurance, e-mail services (Non-classified Internet Protocol (IP) Router Network (NIPRNET)/Secret Internet Protocol Router Network (SIPRNET), and intra/inter-base connectivity services similar to those established on a fixed base. c. ACP hardware will be used to replace the Network Control Center Deployed (NCC-D) running the data center software. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. Funding for this exhibit is contained in program element (PE) 0207422F. PE 0207423F ADVANCED COMMUNICATIONS SYSTEMS consists of Mobile User Objective System (MUOS) and Second-Generation Anti-Jam Tactical Ultra High Frequency Radio for NATO (SATURN) software for the PRC-117G handheld radio. These are commercial off the shelf software programmable tactical radios that provide voice, data, and video communications for military users in the air, on the ground, and at sea. Funding for this exhibit is contained in program element (PE) 0207423F. PE 0207444F TACTICAL AIR CONTROL PARTY-MODERNIZATION (TACP-M): All TACP-M programs execute effective interoperable communications with existing Command, Control, Communications, Computers, & Intelligence (C4I) equipment and must be interoperable with planned C4I equipment tying into the Department of the Air Force's Battle Network, Agile Combat Employment's Communication Packages, the joint force's All Domain Command and Control (JADC2) capabilities/networks, and joint Digitally Aided Close Air Support (DACAS) standards. To ensure survivable and effective C3 capabilities, TACP needs to develop equipment capable of: sensing (passive and active) enemy activity within the electromagnetic environment and deliver non-kinetic effects through ground-based EMSO capabilities; a passive IR sensor which will provide a 24/7 360 degree infrared imaging capability utilizing artificial intelligence for threat detection; procure and integrate High Capacity Beyond Line of Sight (BLOS) Baseband Backhaul and other communications support equipment; field advanced software defined waveforms (Low Probability of Intercept/Low Probability of Detection (LPI/LPD)); provide network architecture to move data across elements and echelons; as well as, procure Small Unmanned Aircraft Systems (sUAS) for communication and network extension. The purpose of Tactical Air Control Party - Modernization (TACP-M) programs is to provide TACPs with modernized Global Positioning System (GPS), laser targeting/designation devices, voice (handheld, manpack and Link-16 radios), data, and video communications (Full Motion Video Receivers/Transceivers), including diverse waveforms and software, advanced targeting equipment, and enhanced battlefield LI 837100 - Tactical C-E Equipment Air Force UNCLASSIFIED Page 2 of 27 P-1 Line #48 Volume 1 - 524 === page 561 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 837100 / Tactical C-E Equipment Equip / BSA 7: Organization and Base ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0207444F Line Item MDAP/MAIS Code: N/A awareness/management capabilities across all domains. Improved targeting and data communications capabilities improve kill chain timelines, defeat adversary systems through opening and closing kill webs, extended critical networks to the forward edge, and when required reduce the probability of fratricide or collateral damage. Tactical Air Control Party - Modernization (TACP-M) programs support includes addressing frequent TACP combat deployments that sometimes lead users to change equipment procurement priorities to support urgent operational needs and respond to evolving threat environments. TACP-M programs jointly develop and procure software, hardware and test assets with other Air Force Special Warfare (AFSPECWAR) programs to consolidate requirements that are common across the AFSPECWAR enterprise. This teaming arrangement helps standardize equipment, improves efficiency by consolidating acquisition efforts, enabling a common baseline, and reducing overall costs. TACP-M programs provide and modernize capabilities in the following five major areas: (1) Air Support Operations Center (ASOC)/Tactical Operational Center (TOC) systems; also known as TACP Command and Control, and communications (C3) (used in static, mobile and maneuverable operations centers), (2) Vehicle Mounted Systems (used in tactical vehicles) and for On-The-Move and At-The-Halt operations, (3) Dismounted Systems (used by TACPs in wearable configurations), (4) Joint all-Domain Command and Control (JADC2) software, and (5) Support distributed and resilient ground-based command and control teams that leverage airpower within the Theater Air Control System. The Air Support Operations Center (ASOC)-Mod TACP C3 (including TACP core computers and Electromagnetic Spectrum), Maneuver Gateway (MG), Beyond Line of Site (BLOS) Baseband Backhaul (BB/ BH), and Deployable Communications Package (DCP) projects are comprised of several Commercial off-the Shelf (COTs)/Government off-the Shelf (GOTs) hardware, software, improved power generation components and associated support. The gateway projects continue to expand Link-16, BLOS and Situational Awareness Data Link (SADL) capabilities for gateway operations (hardware and software) with products currently available to support further integration efforts to meet requirements and gain valuable feedback from other TACP-M programs, innovation sites and the User Engagement Site (UES). TACPM will continue executing C2 Shelter/Trailer procurement and integration to help ensure mobility and maneuver capability. The Tactical Laser Communications project includes the development of a Portable Optical Communication Terminal prototype, providing a Low Probability of Intercept/Low Probability of Detection, and highly anti-jammable communication capability. The Tactical Laser Communications project also includes the procurement and fielding associated test assets, development of supporting Tactical Grid Boundaries and/or networks, enabling global access into the Department of War Information Network, ensuring diverse and resilient pathways for data transmission for TACP military units in remote locations. TACP Mobile Communications System (MCS): Effort includes procuring, integrating, and fielding command and control communication kits for TACP MCS Block 2, TACP MCS Block 3, and TACP MCS Block 4, AN/GRC-259 Stryker as well as MCS Universal which integrates a vehicle-agnostic mobile communications suite of equipment onto legacy, current and future TACP vehicles. Items requested in FY 2027 as identified in this Exhibit are representative but not limited to the items to be procured. Items procured during execution may change based on critical equipment needed to support current Air Force mission requirements. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. Funding for this exhibit is contained in program element (PE) 0207444F. 0208534F COMMAND SUPPORT TACTICAL AIR FORCES: Includes manpower, contracts, peculiar and support equipment, and associated costs specifically identified and measurable to plan, manage, coordinate, and execute Command Support functions. Includes Management Analysis: strategic planning, requirements development. Also includes Finance and Procurement Operations: program/budget analysis/development, financial advisory services, budget execution support, purchasing, leasing, services, obtaining supplies, storage equipment, non-MILCON construction, contract operations. PE 0408011F SPECIAL TACTICS / COMBAT CONTROL: The Special Warfare Acquisition Growth and Refresh (SWAGR) program delivers a wide range of core capabilities/equipment for the Special Tactics (ST) operator to provide the Air Force and Joint Force with support across the following missions: Global Access, Precision Strike, and Personnel Recovery (PR); with additional focus on Electromagnetic Spectrum Operations (EMSO), Counter-Space, Counter-UAS, and Ground-based Suppression of Enemy Air Defenses (SEAD). Core capabilities addressed in this program element focus on delivering a stateof-the-art Command, Control, Communications, Computer, Intelligence, Surveillance and Reconnaissance (C4ISR) capability to include but not restricted to: Command and control (C2) communication systems, body-worn computing systems, power and data management systems, targeting devices, next-gen Visual Augmentation Systems, Electromagnetic Spectrum Operations (EMSO) defensive/offensive systems, LI 837100 - Tactical C-E Equipment Air Force UNCLASSIFIED Page 3 of 27 P-1 Line #48 Volume 1 - 525 === page 562 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 837100 / Tactical C-E Equipment Equip / BSA 7: Organization and Base ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0207444F Line Item MDAP/MAIS Code: N/A Low Probability of Intercept/Low Probability of Detection (LPI/LPD) systems, equipment capable of sensing (passive and active) enemy activity within the electromagnetic spectrum (Radio Frequency (RF) communication) and jamming effectiveness, and Small UAS supporting C4ISR, Personnel Recovery (PR) and Assault Zone missions. SWAGR also supports AFSOC Tactical Command and Control (TAC C2) enhanced communication systems and equipment essential for ST Combat Controller Teams (CCT), PR, Special Reconnaissance, and Tactical Air Control Party (TACP) to perform their mission and communicate Beyond Line of Site (BLOS) with rear echelon C2, to provide a joint operating picture. The ST CCT operators use Assault Zone equipment to gather and transmit assault zone suitability, ISR and weather data, perform Drop Zone/Landing Zone (DZ/LZ) operations, and to support precision/non-precision approaches into austere airfields using military ruggedized portable airfield lighting and navigational aids. AFSOC-assigned PR operators will also utilize portable mass casualty monitoring systems. Items include but are not limited to initial equipment purchases, training, spares, repairs and returns, software licenses and accessories and peripherals. Items requested in FY2027 as identified on the P-5 Exhibit are representative but not limited to the items to be procured. Items procured during execution may change based on critical equipment needed to support current Air Force mission requirements. Due to the rapidly changing threat environment, the acquisition program manager has the authority to redirect funding as necessary to meet current slated and emerging requirements for operational units. Funding for this exhibit is contained in program element (PE) 0408011F. LI 837100 - Tactical C-E Equipment Air Force UNCLASSIFIED Page 4 of 27 P-1 Line #48 Volume 1 - 526 === page 563 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 837100 / Tactical C-E Equipment Equip / BSA 7: Organization and Base ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0207444F Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 AFSPECWAR - TACP P-5 Deployable C3 Systems P-5 Advanced Communications Systems P-5 Tactical Air Control Party-Mod P-5 Command Support - Tactical Air Forces P-5 Special Tactics / Combat Control P-40 Total Gross/Weapon System Cost Subexhibits P-5a, P-21 P-5a, P-21 ID CD Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) A - / - - / 3.620 - / 5.645 - / 3.807 - / - - / 3.807 A - / - - / 58.734 - / 65.350 - / 75.962 - / - - / 75.962 A - / - - / 0.832 - / 0.802 - / 1.077 - / - - / 1.077 A - / - - / 51.076 - / 53.697 - / 60.020 - / - - / 60.020 A P-5a, P-21 MDAP/ MAIS Code - A - / 0.000 - / 0.000 - / 0.000 - / 0.604 - / - - / 0.604 / - - / 24.814 - / 20.335 - / 21.365 - / - - / 21.365 / 0.000 - / 139.076 - / 145.829 - / 162.835 - / - - / 162.835 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: PE 0207418F TACTICAL AIRBORNE CONTROL SYSTEM EQUIPMENT (TACS): FY 2027 funding supports the procurement of additional training devices as needed by the field, the fielding of new capabilities, to include Digitally Aided Close Air Support (DACAS) that implements Link16 messages utilized for CAS, and will also address emerging and short notice Diminishing Manufacturing and Material Shortage (DMSMS) issues. PE 0207423F ADVANCED COMMUNICATIONS SYSTEMS: FY27 funding will be dedicated to procuring Second-Generation Anti-Jam UHF Radio for NATO (SATURN) licenses. These SATURN licenses enable AF users to upgrade AF radios from the Have Quick II datalink to the SATURN datalink, and provide secure line of sight voice. PE 0207422F THEATER DEPLOYABLE COMMUNICATIONS: FY 2027 funding supports increased Air Combat Command (ACC) requirements. Funding will be used as directed by ACC to provide expeditionary communications capabilities to the Deployable Combat Wings. This includes, but is not limited to, providing Agile Communications Packages (ACPs) and Fly Away Communications Terminals (FACTs), to include Military Satellite Communications (SATCOM), multi point network extension mesh radios, and commercial SATCOM capabilities. PE 0207444F TACTICAL AIR CONTROL PARTY-MODERNIZATION (TACP-M): FY 2027 funding is planned to execute efforts to include but not limited to Air Support Operations Center Modernization (ASOCMod), TACP Command and Control (C2) (including procuring TACP core computers), procurement of equipment related to Maneuver Gateway (MG), Beyond Line of Site (BLOS) Baseband Backhaul (BB/ BH), Global Network Access, C2 Shelter/Trailer, Electromagnetic Spectrum (EMS), Tactical Laser Communications, TACP Mobile Communication System (MCS) Kits for TACP MCS Block 3 (Communication equipment integrated in Armored Multi-Purpose Vehicles) and TACP MCS Block 4 (Communication equipment integrated in Joint Light Tactical Vehicles), MCS Universal (MCS-U) activities, Deployable Communications Package (DCP), procurements supporting both Special Warfare Assault Kit (SWAK) and Tactical Assault Kit (TAKBox)(in support of dismounted efforts), and mounted/dismounted radios/ peripherals/targeting equipment/Global Positioning System (GPS)/etc., to include required Diminishing Manufacturing Sources (DMS)/testing and Naval Surface Warfare Center (NSWC) Crane support for all TACP-M programs, both mounted and dismounted. Items requested in FY2027 as identified on the P-5 Exhibit are representative but not limited to the items to be procured. Items procured during execution may change based on critical equipment needed to support current Air Force mission requirements. Due to the rapidly changing threat environment, the acquisition program manager has the authority to redirect funding as necessary to meet current slated and emerging requirements for operational units. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 837100 - Tactical C-E Equipment Air Force UNCLASSIFIED Page 5 of 27 P-1 Line #48 Volume 1 - 527 === page 564 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 837100 / Tactical C-E Equipment Equip / BSA 7: Organization and Base ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0207444F Line Item MDAP/MAIS Code: N/A 0208534F COMMAND SUPPORT TACTICAL AIR FORCES: FY27 funding will be used to procure a modular vault for storing CV-22 unit weapons/ammunitions/explosives at Davis Monthan airbase. PE 0408011F SPECIAL TACTICS/COMBAT CONTROL: FY 2027 funding includes but is not limited to Visual Augmentation Systems (VAS) Near Infrared (IR) and Short-Wave IR laser pointers, VAS laser target designator TLD163s, High Frequency (HF) and multi-band tactical antenna kits, commercial satellite communications for long range data/voice, low probability of detection/interception encrypted pass through radios, field computing device tablets, coded target acquisition markers, radar sensing equipment, small unmanned systems (short and medium range), handheld and manpack radio rechargeable batteries and battery chargers, Electromagnetic Spectrum Operations (EMSO) equipment, Android Tactical Awareness Kits (ATAK) wearables, Assault Zone (AZ) lighting systems, AZ survey tools and next generation airfield survey device. The FY 2026 spend plan amount for [Tactical C-E Equipment] includes [145,829] thousand of discretionary and [32,000) thousand of mandatory (reconciliation) for a total of [177,829]. Items requested in FY2027 as identified on the P-5 Exhibit are representative but not limited to the items to be procured. Items procured during execution may change based on critical equipment needed to support current Air Force mission requirements. Due to the rapidly changing threat environment, the acquisition program manager has the authority to redirect funding as necessary to meet current slated and emerging requirements for operational units. LI 837100 - Tactical C-E Equipment Air Force UNCLASSIFIED Page 6 of 27 P-1 Line #48 Volume 1 - 528 === page 565 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 837100 / Tactical C-E Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: AFSPECWAR - TACP MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 3.620 5.645 3.807 - 3.807 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 3.620 5.645 3.807 - 3.807 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 3.620 5.645 3.807 - 3.807 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - TACP Fixed Simulator - JTC TRS Cost Recurring Cost TACP Fixed Simulators - JTC TRS - - - 3.617 3.617 5.645 5.645 1.122 1.122 - - - 1.122 Subtotal: Recurring Cost - - - - - 3.617 - - 5.645 - - 1.122 - - - - - 1.122 Subtotal: Hardware - TACP Fixed Simulator - JTC TRS Cost - - - - - 3.617 - - 5.645 - - 1.122 - - - - - 1.122 - - - 0.003 0.003 - - - 2.685 2.685 - - - 2.685 Subtotal: Support - TACP SIM Support Cost - - - - - 0.003 - - - - - 2.685 - - - - - 2.685 Gross/Weapon System Cost - - - - - 3.620 - - 5.645 - - 3.807 - - - - - 3.807 1 1 1 1 1.122 Support - TACP SIM Support Cost Management Services Contractor Services and other Government Costs 1 1 1 2.685 Remarks: Program support costs are expected to rise in FY2027. LI 837100 - Tactical C-E Equipment Air Force UNCLASSIFIED Page 7 of 27 P-1 Line #48 Volume 1 - 529 === page 566 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 837100 / Tactical C-E Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Deployable C3 Systems MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 58.734 65.350 75.962 - 75.962 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 58.734 65.350 75.962 - 75.962 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 58.734 65.350 75.962 - 75.962 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Deployable C3 Systems Cost Recurring Cost TDC - Integrated Communications - - - 0.130 267 34.710 0.538 93 50.034 0.148 347 51.356 - - - 0.148 347 51.356 - - - 0.125 160 20.000 0.062 196 12.152 0.115 179 20.585 - - - 0.115 179 20.585 - - - - - 54.710 - - 62.186 - - 71.941 - - - - - 71.941 - - - - - 54.710 - - 62.186 - - 71.941 - - - - - 71.941 Program Support Costs Contractor Services - - - 3.137 1 3.137 2.194 1 2.194 3.034 1 3.034 - - - 3.034 1 3.034 Program Support Costs Other Government Costs 1 0.887 0.970 1 0.970 0.987 1 0.987 - - - 0.987 1 0.987 (†) Access Packages TDC - Satcom (†) Terminals Subtotal: Recurring Cost Subtotal: Hardware Deployable C3 Systems Cost Support - Deployable C3 Systems Cost - - - 0.887 Subtotal: Support Deployable C3 Systems Cost - - - - - 4.024 - - 3.164 - - 4.021 - - - - - 4.021 Gross/Weapon System Cost - - - - - 58.734 - - 65.350 - - 75.962 - - - - - 75.962 Remarks: FY2026 to FY2027 unit cost decreases are due to component changes to meet newly defined requirements. LI 837100 - Tactical C-E Equipment Air Force UNCLASSIFIED Page 8 of 27 P-1 Line #48 Volume 1 - 530 === page 567 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 P-1 Line Item Number / Title: 837100 / Tactical C-E Equipment ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Deployable C3 Systems MDAP/MAIS Code: DEPLOYABLE C3: FY 2027 funding supports increased Air Combat Command (ACC) requirements. Funding will be used as directed by ACC to provide expeditionary communications capabilities to the Deployable Combat Wings. This includes, but is not limited to, providing Agile Communications Packages (ACPs) and Fly Away Communications Terminals (FACTs), to include Military Satellite Communications (SATCOM), multi point network extension mesh radios, and commercial SATCOM capabilities (†) indicates the presence of a P-5a LI 837100 - Tactical C-E Equipment Air Force UNCLASSIFIED Page 9 of 27 P-1 Line #48 Volume 1 - 531 === page 568 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 FY Contractor and Location TDC - Integrated Communications Access Packages 2023 TBD / TBD C / FFP Hanscom AFB Feb 2023 Oct 2023 0 0.000 Y Dec 2022 TDC - Integrated Communications Access Packages 2024 TBD / TBD C / FFP Hanscom AFB Feb 2024 Aug 2024 0 0.000 Y Dec 2023 2025 TBD / TBD C / FFP Hanscom AFB Feb 2025 Aug 2025 267 0.130 Y 2026 TBD / TBD C / FFP Hanscom AFB Feb 2026 Aug 2026 93 0.538 Y 2027 TBD / TBD C / FFP Hanscom AFB Feb 2027 Aug 2027 347 0.148 Y TDC - Satcom Terminals 2023 TBD / TBD C / FFP Hanscom AFB Sep 2023 Oct 2023 0 0.000 Y Dec 2022 TDC - Satcom Terminals 2024 TBD / TBD C / FFP Hanscom AFB Aug 2024 May 2025 0 0.000 Y Dec 2023 TDC - Satcom Terminals (†) 2025 TBD / TBD C / FFP Hanscom AFB Jan 2025 Aug 2025 160 0.125 Y TDC - Satcom Terminals (†) 2026 TBD / TBD C / FFP Hanscom AFB May 2026 Jan 2027 196 0.062 Y TDC - Satcom Terminals (†) 2027 TBD / TBD C / FFP Hanscom AFB Jan 2027 Aug 2027 179 0.115 Y TDC - Integrated Communications (†) Access Packages TDC - Integrated Communications (†) Access Packages TDC - Integrated Communications (†) Access Packages (†) Item Number / Title [DODIC]: Deployable C3 Systems Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 837100 / Tactical C-E Equipment Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 837100 - Tactical C-E Equipment Air Force UNCLASSIFIED Page 10 of 27 P-1 Line #48 Volume 1 - 532 === page 569 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 837100 / Tactical C-E Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Deployable C3 Systems Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Fiscal Year 2024 Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E TDC - Integrated Communications Access Packages 1 2025 AF 267 0 267 1 2026 AF 93 0 93 267 93 1 2027 AF 347 0 347 347 TDC - Satcom Terminals 2 2025 AF 160 0 160 160 2 2026 AF 196 0 196 196 2 2027 AF 179 0 179 179 O C T LI 837100 - Tactical C-E Equipment Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 27 S E P O C T N O V D E C J A N F E B P-1 Line #48 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 533 === page 570 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 837100 / Tactical C-E Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Deployable C3 Systems Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P TDC - Integrated Communications Access Packages 1 2025 AF 267 0 267 1 2026 AF 93 0 93 1 2027 AF 347 0 347 A - - - - - - 50 50 50 50 50 17 0 A - - - - - - 50 30 13 347 TDC - Satcom Terminals 2 2025 AF 160 0 160 2 2026 AF 196 0 196 2 2027 AF 179 0 179 A - - - - - - 23 - - - - 25 26 - - - 30 30 26 A - - - - 0 - 196 179 O C T LI 837100 - Tactical C-E Equipment Air Force - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 27 S E P O C T N O V D E C J A N F E B P-1 Line #48 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 534 === page 571 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 837100 / Tactical C-E Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Deployable C3 Systems Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E TDC - Integrated Communications Access Packages 1 2025 AF 267 267 0 1 2026 AF 93 80 13 1 2027 AF 347 0 347 0 13 0 A - - - - - - 30 30 30 30 30 16 - - - - - - 50 50 50 50 50 50 47 0 TDC - Satcom Terminals 2 2025 AF 160 160 0 2 2026 AF 196 0 196 2 2027 AF 179 0 179 0 - - 30 A - O C T LI 837100 - Tactical C-E Equipment Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L 0 30 A U G UNCLASSIFIED Page 13 of 27 30 S E P 30 O C T 30 N O V 30 D E C 29 J A N 0 F E B P-1 Line #48 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 535 === page 572 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 837100 / Tactical C-E Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Item Number / Title [DODIC]: Deployable C3 Systems Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 TBD - TBD 1 1 347 0 0 0 0 1 5 6 11 2 TBD - TBD 1 1 179 0 0 0 0 1 4 7 11 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 837100 - Tactical C-E Equipment Air Force UNCLASSIFIED Page 14 of 27 P-1 Line #48 Volume 1 - 536 === page 573 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 837100 / Tactical C-E Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Advanced Communications Systems MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 0.832 0.802 1.077 - 1.077 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.832 0.802 1.077 - 1.077 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.832 0.802 1.077 - 1.077 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Software - Advanced Communications Systems Cost Recurring Cost MUOS Contracts - - - 0.050 SATURN Waveform Licenses 9 0.450 - - - - - - - - - - - - - - - Subtotal: Recurring Cost - - - 0.003 49 0.147 0.003 108 0.324 0.004 269 1.077 - - - 0.004 269 1.077 - - 0.597 - - 0.324 - - 1.077 - - - - - Subtotal: Software Advanced Communications Systems Cost 1.077 - - - - - 0.597 - - 0.324 - - 1.077 - - - - - 1.077 0.235 - - 0.478 - - - - - - - - - Support - Advanced Communications Systems Cost - - - 0.235 Subtotal: Support Advanced Communications Systems Cost Program Support 1 - - - - - 0.235 - - 0.478 - - - - - - - - - Gross/Weapon System Cost - - - - - 0.832 - - 0.802 - - 1.077 - - - - - 1.077 Remarks: FY 2027: The FY 2026 President's Budget submittal did not reflect FY 2027 through FY 2030 funding. Therefore, an explanation for the change between the two budget positions for FY 2027 cannot be made in a relevant manner. LI 837100 - Tactical C-E Equipment Air Force UNCLASSIFIED Page 15 of 27 P-1 Line #48 Volume 1 - 537 === page 574 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 837100 / Tactical C-E Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Tactical Air Control Party-Mod MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 51.076 53.697 60.020 - 60.020 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 51.076 53.697 60.020 - 60.020 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 51.076 53.697 60.020 - 60.020 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Hardware End Item Cost Recurring Cost TACP Mobile Communications Systems Universal - - - 1.667 3 5.000 1.667 1 1.667 1.038 1 1.038 - - - 1.038 1 1.038 TACP Mobile Communications Systems Block 3 - - - 0.235 6 1.411 1.633 2 3.266 0.655 6 3.927 - - - 0.655 6 3.927 TACP Mobile Communications Systems Block 4 - - - 0.373 10 3.726 0.253 22 5.563 - - - - - - - - - - - - - - - 1.042 11 11.462 1.038 26 26.994 - - - 1.038 26 26.994 Maneuver Gateway - - - - - - 0.655 22 14.400 - - - - - - - - - Subtotal: Recurring Cost - - - - - 10.137 - - 36.358 - - 31.959 - - - - - 31.959 - - - - - 10.137 - - 36.358 - - 31.959 - - - - - 31.959 TACP C2 Core Computers - - - 0.007 407 2.783 - - - 0.007 10 0.068 - - - 0.007 10 0.068 High Capacity Beyond Line of Sight (BLOS) Baseband Backhaul - - - 0.537 35 18.800 0.007 331 2.233 - - - - - - - - - Deployable Communications Package (DCP) (†) Subtotal: Hardware Hardware End Item Cost Hardware - Hardware end item Cost Non Recurring Cost LI 837100 - Tactical C-E Equipment Air Force UNCLASSIFIED Page 16 of 27 P-1 Line #48 Volume 1 - 538 === page 575 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 837100 / Tactical C-E Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Tactical Air Control Party-Mod MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Electromagnetic Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) - - - - - - - - - 0.387 35 13.537 - - - 0.387 35 13.537 Tactical Laser Communication - - - - - - - - - 0.400 1 0.400 - - - 0.400 1 0.400 AN/PRC-160 - - - 0.031 220 6.729 - - - 0.031 10 0.306 - - - 0.031 10 0.306 - - - - - 28.312 - - 2.233 - - 14.311 - - - - - 14.311 - - - - - 28.312 - - 2.233 - - 14.311 - - - - - 14.311 CRANE SUPPORT - - - - - 3.887 - - 5.426 - - 5.170 - - - - - 5.170 MANAGEMENT SERVICES CONTRACTOR SERVICES - - - - - 5.257 - - 6.941 - - 5.100 - - - - - 5.100 MANAGEMENT SERVICES - OTHER GOV'T COSTS - - - - - 2.563 - - 1.377 - - 1.580 - - - - - 1.580 TEST SUPPORT - - - - - 0.920 - - 1.227 - - 1.300 - - - - - 1.300 Joint Personal Edge Computing Device-TA - - - - - - - - 0.135 - - 0.600 - - - - - 0.600 Subtotal: Support 0207444F Cost - - - - - 12.627 - - 15.106 - - 13.750 - - - - - 13.750 Gross/Weapon System Cost - - - - - 51.076 - - 53.697 - - 60.020 - - - - - 60.020 Spectrum (EMS) (†) Subtotal: Non Recurring Cost Subtotal: Hardware Hardware end item Cost Support - 0207444F Cost Remarks: Recurring: Consistent Program Non-Recurring: Equipment Buys (†) indicates the presence of a P-5a LI 837100 - Tactical C-E Equipment Air Force UNCLASSIFIED Page 17 of 27 P-1 Line #48 Volume 1 - 539 === page 576 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 O O C Cost Elements Deployable Communications Package (DCP) (†) Deployable Communications Package (DCP) (†) (†) Electromagnetic Spectrum (EMS) (†) P-1 Line Item Number / Title: 837100 / Tactical C-E Equipment Item Number / Title [DODIC]: Tactical Air Control Party-Mod FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) 2026 TBD / TBD TBD TBD Jun 2026 Dec 2026 11 1.042 Y 2027 TBD / TBD TBD TBD Jun 2027 Dec 2027 26 1.038 Y 2027 TBD / TBD TBD TBD Jun 2027 Dec 2027 35 0.387 Y Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 837100 - Tactical C-E Equipment Air Force UNCLASSIFIED Page 18 of 27 P-1 Line #48 Volume 1 - 540 === page 577 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 837100 / Tactical C-E Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Tactical Air Control Party-Mod Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Deployable Communications Package (DCP) 1 2026 AF 11 0 11 1 2027 AF 26 0 26 35 0 35 A - - - - - - 6 5 0 A - - - - 26 - 35 Electromagnetic Spectrum (EMS) 2 2027 AF A O C T LI 837100 - Tactical C-E Equipment Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 19 of 27 S E P O C T N O V D E C J A N F E B P-1 Line #48 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 541 === page 578 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 837100 / Tactical C-E Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Tactical Air Control Party-Mod Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Deployable Communications Package (DCP) 1 2026 AF 11 11 0 1 2027 AF 26 0 26 35 0 35 0 - - 5 5 5 5 6 0 Electromagnetic Spectrum (EMS) 2 2027 AF O C T LI 837100 - Tactical C-E Equipment Air Force N O V 5 D E C 5 J A N 5 F E B 5 M A R 5 A P R 5 M A Y 5 J U N 0 J U L A U G UNCLASSIFIED Page 20 of 27 S E P O C T N O V D E C J A N F E B P-1 Line #48 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 542 === page 579 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 837100 / Tactical C-E Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Item Number / Title [DODIC]: Tactical Air Control Party-Mod Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 TBD - TBD 1 1 150 1 0 0 0 1 9 6 15 2 TBD - TBD 1 1 175 0 0 0 0 1 9 6 15 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 837100 - Tactical C-E Equipment Air Force UNCLASSIFIED Page 21 of 27 P-1 Line #48 Volume 1 - 543 === page 580 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 837100 / Tactical C-E Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Command Support - Tactical Air Forces MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 0.000 0.000 0.000 0.604 - 0.604 - - - - - - 0.000 0.000 0.000 0.604 - 0.604 - - - - - - 0.000 0.000 0.000 0.604 - 0.604 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Command Support - Tactical Air Forces Cost Recurring Cost - - 0.000 - - 0.000 - - 0.000 0.604 0.604 - - - 0.604 Subtotal: Recurring Cost xyz - - 0.000 - - 0.000 - - 0.000 - - 0.604 - - - - - 0.604 Subtotal: Hardware Command Support - Tactical Air Forces Cost - - 0.000 - - 0.000 - - 0.000 - - 0.604 - - - - - 0.604 Gross/Weapon System Cost - - 0.000 - - 0.000 - - 0.000 - - 0.604 - - - - - 0.604 LI 837100 - Tactical C-E Equipment Air Force UNCLASSIFIED Page 22 of 27 1 P-1 Line #48 1 0.604 Volume 1 - 544 === page 581 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 837100 / Tactical C-E Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Special Tactics / Combat Control MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 24.814 20.335 21.365 - 21.365 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 24.814 20.335 21.365 - 21.365 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 24.814 20.335 21.365 - 21.365 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Hardware End Item Cost Recurring Cost (†) - - - 0.013 1,700 22.100 0.013 1,133 14.729 0.013 1,208 15.704 - - - 0.013 1,208 15.704 Subtotal: Recurring Cost - - - - - 22.100 - - 14.729 - - 15.704 - - - - - 15.704 - - - - - 22.100 - - 14.729 - - 15.704 - - - - - 15.704 MANAGEMENT SERVICES CONTRACTOR SERVICES - - - - - 1.633 - - 4.055 - - 4.100 - - - - - 4.100 MANAGEMENT SERVICES - OTHER GOVERNMENT COSTS - - - - - 1.081 - - 1.551 - - 1.561 - - - - - 1.561 Subtotal: Support - Support End Item Cost - - - - - 2.714 - - 5.606 - - 5.661 - - - - - 5.661 Gross/Weapon System Cost - - - - - 24.814 - - 20.335 - - 21.365 - - - - - 21.365 SWAGR Subtotal: Hardware Hardware End Item Cost Support - Support End Item Cost (†) indicates the presence of a P-5a LI 837100 - Tactical C-E Equipment Air Force UNCLASSIFIED Page 23 of 27 P-1 Line #48 Volume 1 - 545 === page 582 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Cost Elements (†) SWAGR (†) SWAGR (†) SWAGR (†) O O C P-1 Line Item Number / Title: 837100 / Tactical C-E Equipment Item Number / Title [DODIC]: Special Tactics / Combat Control FY Contractor and Location Method/Type or Funding Vehicle 2025 Multiple / Multiple Various AFLCMC Wright Patterson AFB Nov 2024 Jul 2025 1,700 0.013 Y Oct 2024 2026 Multiple / Multiple Various AFLCMC Wright Patterson AFB Nov 2025 Jul 2026 1,133 0.013 Y Oct 2025 2027 Multiple / Multiple Various AFLCMC Wright Patterson AFB Nov 2026 Jul 2027 1,208 0.013 Y Oct 2026 Location of PCO Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($ M) RFP Issue Date indicates the presence of a P-21 LI 837100 - Tactical C-E Equipment Air Force UNCLASSIFIED Page 24 of 27 P-1 Line #48 Volume 1 - 546 === page 583 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 837100 / Tactical C-E Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Cost Elements (Units in Each) O O C M F R # Item Number / Title [DODIC]: Special Tactics / Combat Control Fiscal Year 2025 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT FY SERVICE 1 2025 AF 1,700 0 1,700 1 2026 AF 1,133 0 1,133 1 2027 AF 1,208 0 1,208 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N Calendar Year 2026 J U L A U G S E P O C T 160 160 160 160 N O V D E C J A N F E B M A R A P R M A Y J U N 160 150 150 150 150 150 150 - - - - - - J U L A U G S E P SWAGR A - - - - - - - A - 0 - 90 90 90 863 1,208 O C T LI 837100 - Tactical C-E Equipment Air Force - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 25 of 27 S E P O C T N O V D E C J A N F E B P-1 Line #48 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 547 === page 584 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 837100 / Tactical C-E Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Cost Elements (Units in Each) O O C M F R # PROC QTY Item Number / Title [DODIC]: Special Tactics / Combat Control Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT FY SERVICE 1 2025 AF 1,700 1,700 0 1 2026 AF 1,133 270 863 1 2027 AF 1,208 0 1,208 Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E SWAGR 0 90 A O C T LI 837100 - Tactical C-E Equipment Air Force 90 N O V D E C 90 90 90 90 90 90 73 70 - - - - - - - 100 100 100 100 101 101 101 101 101 101 101 101 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J A N F E B M A R A P R M A Y J U N 0 UNCLASSIFIED Page 26 of 27 P-1 Line #48 0 J U L A U G S E P Volume 1 - 548 === page 585 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 837100 / Tactical C-E Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Item Number / Title [DODIC]: Special Tactics / Combat Control Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Multiple - Multiple MSR For 2027 1-8-5 For 2027 MAX For 2027 1,208 1,208 1,208 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 396 ALT After Oct 1 Manufacturing PLT 2 Total After Oct 1 8 10 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 837100 - Tactical C-E Equipment Air Force UNCLASSIFIED Page 27 of 27 P-1 Line #48 Volume 1 - 549 === page 586 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 550 === page 587 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 837140 / Next Generation Survival Radio (NGSR) Equip / BSA 7: Organization and Base ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0207279F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 0.000 0.000 80.321 - 80.321 2.361 2.406 2.453 2.502 - 90.043 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 0.000 0.000 80.321 - 80.321 2.361 2.406 2.453 2.502 - 90.043 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 0.000 0.000 80.321 - 80.321 2.361 2.406 2.453 2.502 - 90.043 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - 6.870 - 6.870 - - - - - 6.870 Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The Next Generation Survivor Radio (NGSR) program is an Air Force led effort to replace the aging Combat Survivor Evader Locator (CSEL) Radio supporting the entire Joint force. The Department of War (DoW) plans for the NGSR Handheld Radio (HHR) system and support equipment to serve as the primary communications link for all DoW aircrew who become isolated personnel (IP). NGSR will replace legacy satellite communication and encryption methods to deliver communication capability in support of the Joint Personnel Recovery Agency (JPRA) Combat Search and Rescue (CSAR) mission to locate, authenticate, and communicate with Joint forces who become IPs. NGSR provides secure, over-the-horizon, two-way data communications and precise geo-positioning information to rescue forces. Additionally, NGSR is able to operate in anti-access/area denial (A2/AD) environments by providing a National Reconnaissance Office (NRO) approved low probability of intercept/low probability of detection communication pathway for IPs. NGSR is one node of an overall personnel recovery network which includes multiple on-orbit satellite constellations, geographically dispersed satellite ground stations, joint service CSAR communication devices, and a Joint Personnel Recovery Center (JPRC) cloud-based web application. NGSR plans to incorporate modern encryption technology to comply with current National Security Agency (NSA) cryptographic standards. This effort will replace the CSEL Ultra High Frequency Base Station (UBS) (AN/GRC-242A, Part Number 4866150-100-11) and the CSEL HHR Radio Sets (AN/PRQ-7, Part Number 4866112-101-11; and AN/ PRQ-7A, Part Number 4866113-101). Key milestone dates are projected for Developmental Test & Evaluation (DT&E) and Initial Operational Test & Evaluation (IOT&E) in August 2026, and Operational Test & Evaluation (OT&E) in January 2027. The Air Force will meet system objectives by executing a competitive Rapid Fielding effort to field an NGSR artifact. The NGSR fielding effort is a new start. Funding for this exhibit contained in PE 0207279F. LI 837140 - Next Generation Survival Radio (NGSR) Air Force UNCLASSIFIED Page 1 of 7 P-1 Line #49 Volume 1 - 551 === page 588 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 837140 / Next Generation Survival Radio (NGSR) Equip / BSA 7: Organization and Base ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0207279F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Next Generation Survival Radio (NGSR) P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 B MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 0.000 - / 0.000 - / 80.321 - / - - / 80.321 - / - - / 0.000 - / 0.000 - / 80.321 - / - - / 80.321 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: This program is a new start. The FY 2027 budget request goes toward procurement of 6,868 Handheld Radio units, spares, and associated support equipment. The FY 2027 cost of the Combat Survivor Evader Locator Next Generation Survival Radio Rapid Fielding under Middle Tier of Acquisition effort is reflected in the budget request, including RDT&E and procurement of prototype units. The Department will certify FYDP funding in a future budget submission. LI 837140 - Next Generation Survival Radio (NGSR) Air Force UNCLASSIFIED Page 2 of 7 P-1 Line #49 Volume 1 - 552 === page 589 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 837140 / Next Generation Survival Radio (NGSR) Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: Next Generation Survival Radio (NGSR) MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 0.000 0.000 80.321 - 80.321 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.000 0.000 80.321 - 80.321 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.000 0.000 80.321 - 80.321 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - 6.870 - 6.870 Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Next Generation Survival Radio (NGSR) Cost Recurring Cost Handheld Radio - - - - - 0.000 - - 0.000 0.010 6,868 68.680 - - - 0.010 6,868 68.680 Subtotal: Recurring Cost - - - - - 0.000 - - 0.000 - - 68.680 - - - - - 68.680 Subtotal: Hardware - Next Generation Survival Radio (NGSR) Cost - - - - - 0.000 - - 0.000 - - 68.680 - - - - - 68.680 10.956 - - - 10.956 Procurement (†) Logistics - Next Generation Survival Radio (NGSR) Cost Recurring Cost Handheld Radio (†) - - - - - - - - - 10.956 Subtotal: Recurring Cost - - - - - - - - - - - 10.956 - - - - - 10.956 Subtotal: Logistics - Next Generation Survival Radio (NGSR) Cost - - - - - - - - - - - 10.956 - - - - - 10.956 0.685 - - - 0.685 Support Equipment 1 1 10.956 Support - Next Generation Survival Radio (NGSR) Cost Program Support Costs - - - - - - - - - 0.685 Subtotal: Support - Next Generation Survival Radio (NGSR) Cost - - - - - - - - - - - 0.685 - - - - - 0.685 Gross/Weapon System Cost - - - - - 0.000 - - 0.000 - - 80.321 - - - - - 80.321 LI 837140 - Next Generation Survival Radio (NGSR) Air Force UNCLASSIFIED Page 3 of 7 1 P-1 Line #49 1 0.685 Volume 1 - 553 === page 590 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 P-1 Line Item Number / Title: 837140 / Next Generation Survival Radio (NGSR) ID Code (A=Service Ready, B=Not Service Ready) : B (†) Item Number / Title [DODIC]: Next Generation Survival Radio (NGSR) MDAP/MAIS Code: indicates the presence of a P-5a LI 837140 - Next Generation Survival Radio (NGSR) Air Force UNCLASSIFIED Page 4 of 7 P-1 Line #49 Volume 1 - 554 === page 591 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 O O C Cost Elements Handheld Radio Procurement Handheld Radio Support Equipment (†) (†) P-1 Line Item Number / Title: 837140 / Next Generation Survival Radio (NGSR) Method/Type or Funding Vehicle Item Number / Title [DODIC]: Next Generation Survival Radio (NGSR) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty FY Contractor and Location 2027 General Dynamics Mission Systems / Scottsdale, AZ TBD AFLCMC Hill AFB Oct 2026 Jun 2027 6,868 0.010 N Aug 2026 2027 General Dynamics Mission Systems / Scottsdale, AZ TBD AFLCMC Hill AFB Oct 2026 Jun 2027 1 10.956 N Aug 2026 (Each) RFP Issue Date indicates the presence of a P-21 LI 837140 - Next Generation Survival Radio (NGSR) Air Force UNCLASSIFIED Page 5 of 7 P-1 Line #49 Volume 1 - 555 === page 592 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 837140 / Next Generation Survival Radio (NGSR) Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Next Generation Survival Radio (NGSR) Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT O C T 0 A - Fiscal Year 2028 Calendar Year 2027 N O V D E C J A N F E B M A R A P R M A Y J U N Calendar Year 2028 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Handheld Radio Procurement 1 2027 AF 6,868 6,868 O C T N O V D E C LI 837140 - Next Generation Survival Radio (NGSR) Air Force J A N F E B M A R A P R M A Y 6,868 J U N 0 UNCLASSIFIED Page 6 of 7 P-1 Line #49 Volume 1 - 556 === page 593 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 837140 / Next Generation Survival Radio (NGSR) Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: Next Generation Survival Radio (NGSR) Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 General Dynamics Mission Systems - Scottsdale, AZ MSR For 2027 1-8-5 For 2027 MAX For 2027 5,000 6,868 7,000 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 1 8 Total After Oct 1 ALT Prior to Oct 1 9 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 837140 - Next Generation Survival Radio (NGSR) Air Force UNCLASSIFIED Page 7 of 7 P-1 Line #49 Volume 1 - 557 0 === page 594 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 558 === page 595 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 837170 / Combat Survivor Evader Locater Equip / BSA 7: Organization and Base ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 1203176F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 1.778 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 - 1.778 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 1.778 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 - 1.778 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 1.778 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 - 1.778 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The Combat Survivor Evader Locator (CSEL) System provides aircrews with end-to-end global satellite secure emergency communication capability during combat and peace-time flying operations. CSEL provides a hand held radio as part of the mandatory aircrew survival gear. CSEL is a joint program (Air Force, Army, Navy, and US Marine Corps) and is the DoW program of record for personnel recovery survival radios. CSEL supports four of five Personnel Mission Phases: Report, Locate, Support, and Recover. Funding for this exhibit contained in PE 1203176F. LI 837170 - Combat Survivor Evader Locater Air Force UNCLASSIFIED Page 1 of 3 P-1 Line #50 Volume 1 - 559 === page 596 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 837170 / Combat Survivor Evader Locater Equip / BSA 7: Organization and Base ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 1203176F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Combat Survivor Evader Locater P-40 Total Gross/Weapon System Cost Subexhibits ID CD B MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 1.778 - / 0.000 - / 0.000 - / - - / 0.000 - / - - / 1.778 - / 0.000 - / 0.000 - / - - / 0.000 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: No FY 2027 funding requested. Beginning in FY 2026, all efforts for PE 1203176F (Combat Survivor Evader Locator) Line Item 837170 (Combat Survivor Evader Locater) were reprogrammed to RDT&E, AF and will be executed from PE 0207279F (Isolated Personnel Survivability and Recovery) Project 654522 (CSAR EMD) in order to consolidate program efforts and reduce the quantity of program elements. This funding document is for the FY 2025 year of execution. LI 837170 - Combat Survivor Evader Locater Air Force UNCLASSIFIED Page 2 of 3 P-1 Line #50 Volume 1 - 560 === page 597 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 837170 / Combat Survivor Evader Locater Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: Combat Survivor Evader Locater MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 1.778 0.000 0.000 - 0.000 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 1.778 0.000 0.000 - 0.000 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 1.778 0.000 0.000 - 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Software - Combat Survivor Evader Locator Cost Non Recurring Cost Terminal Area Guidance Waveform - - - - - 1.778 - - 0.000 - - 0.000 - - - - - 0.000 Subtotal: Non Recurring Cost - - - - - 1.778 - - 0.000 - - 0.000 - - - - - 0.000 Subtotal: Software - Combat Survivor Evader Locator Cost - - - - - 1.778 - - 0.000 - - 0.000 - - - - - 0.000 Gross/Weapon System Cost - - - - - 1.778 - - 0.000 - - 0.000 - - - - - 0.000 Remarks: Beginning in FY 2026, all efforts for PE 1203176F (Combat Survivor Evader Locator) Line Item 837170 (Combat Survivor Evader Locater) were reprogrammed to RDT&E, AF and will be executed from PE 0207279F (Isolated Personnel Survivability and Recovery) Project 654522 (CSAR EMD) in order to consolidate program efforts and reduce the quantity of program elements. This funding document is for the FY 2025 year of execution. LI 837170 - Combat Survivor Evader Locater Air Force UNCLASSIFIED Page 3 of 3 P-1 Line #50 Volume 1 - 561 === page 598 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 562 === page 599 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 837190 / Radio Equipment Equip / BSA 7: Organization and Base ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Procurement Quantity (Units in Each) - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 43.512 50.730 36.874 - 36.874 37.648 38.358 39.079 39.861 - Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 43.512 50.730 36.874 - 36.874 37.648 38.358 39.079 39.861 - Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 43.512 50.730 36.874 - 36.874 37.648 38.358 39.079 39.861 - Total 286.062 286.062 286.062 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: PE 0303133F HIGH FREQUENCY GLOBAL COMMUNICATIONS SYSTEM (HFGCS) The High Frequency Global Communications System (HFGCS) program provides the Department of War (DoW) with a critical unique strategic asset: a global, high-power, high-frequency (HF) network. This network ensures resilient communication for both nuclear and non-nuclear command and control (NC3/C2), serving a wide range of users, including US Strategic Command (USSTRATCOM), Air Mobility Command, the White House Communications Agency, Navy submariner forces, and other government agencies like the Department of Homeland Security and the Federal Emergency Management Agency (FEMA). HFGCS is essential for disseminating critical information to global strategic forces, especially in contested environments where satellite communications might be compromised. The program leverages a network of 13 strategically located ground stations and two network control stations equipped with modern, commercially based, HF radio technology, ensuring beyond-line-of-sight communication with aircraft, ships, and land-based platforms. Procurement funding focuses on modernizing and maintaining this vital system by replacing outdated audio switching equipment, mitigating obsolescence issues, and enhancing cybersecurity. These upgrades will ensure HFGCS remains a reliable and resilient communication backbone for the DoW and its partners. Specifically, this funding supports six key modernization lines of effort: improving Arctic C2, implementing robust HF waveforms across the DoW, supporting Air Force HF modernization efforts, integrating Air Operations Center HF requirements, implementing a robust Pacific Air Forces (PACAF) HF strategy for the US Indo-Pacific Command (INDOPACOM) area of responsibility (AOR), and executing NC3 HF modernization. Additionally, it covers Direct Mission Support/Program Support Costs (DMS/PMA), System Engineering, Joint Interoperability Test Center (JITC) installation testing, and shipping. This funding also prioritizes the acquisition of controlled, critical protection items classified as essential military communication equipment. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. Funding for this exhibit contained in PE 0303133F PE 0305158F TACTICAL TERMINAL (TT) LI 837190 - Radio Equipment Air Force UNCLASSIFIED Page 1 of 15 P-1 Line #51 Volume 1 - 563 === page 600 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 837190 / Radio Equipment Equip / BSA 7: Organization and Base ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A The TT program provides Integrated Broadcast Service (IBS)-compatible terminals (radios) that access the IBS broadcast providing AF warfighters strategic, operational, and tactical intelligence and threat warning information. The TT family of systems provide both AF airborne and ground weapons systems transmit/receive and receive-only solutions. The TT program does not provide the IBS broadcast (PE 0305179F IBS provides the IBS broadcast). Funding for this exhibit contained in PE 0305158F. PE 0102325 ATMOSPHERIC EARLY WARNING SYSTEM The AEWS program integrates sensors and radios to execute key Homeland Defense missions. The current HF radios installed on AF aircraft & ground nodes have reached obsolescence and there is a compelling need to modernize HF capabilities. Beyond Line of Sight (BLOS) data link is often the only recourse NORAD has to conduct Homeland Defense. NORAD has an existing and enduring BLOS requirement. Impending sunset of Link 11 will eliminate NORAD's data link capable of fulfilling many of its mission operations. LI 837190 - Radio Equipment Air Force UNCLASSIFIED Page 2 of 15 P-1 Line #51 Volume 1 - 564 === page 601 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 837190 / Radio Equipment Equip / BSA 7: Organization and Base ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 Tactical Terminal P-5a, P-21 A - / - - / 6.258 - / 14.077 - / 0.000 - / - - / 0.000 P-5 High Frequency Radio Systems P-5a, P-21 A - / - - / 34.752 - / 35.355 - / 36.874 - / - - / 36.874 P-5 Atmospheric Early Warning System A - / - - / 2.502 - / 1.298 - / 0.000 - / - - / 0.000 P-40 Total Gross/Weapon System Cost - / - - / 43.512 - / 50.730 - / 36.874 - / - - / 36.874 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: PE 0303133F HIGH FREQUENCY GLOBAL COMMUNICATIONS SYSTEM (HFGCS) FY 2027 procurement funding for the High Frequency Global Communications System (HFGCS) focuses on modernizing the radio/network infrastructure and replacing aging antenna systems across its global network of 13 ground stations and two network control stations. The radio/network infrastructure modernization effort prioritizes replacing outdated components with commercially available technology to enhance capabilities and ensure long-term system viability. This includes upgrading the Unified Capabilities/Audio Communications Functionality (UC/ACF) to eliminate over 400 hardware items with a software capability, transitioning the HFGCS network to a more robust and flexible cloud environment. This also includes transitioning the HFGCS network from a point-to-point radio communications system to a more robust and flexible high frequency mesh network environment to provide simultaneous capability to the joint war fighter. Funding will also replace the current 30-year-old high power amplifiers (HPAs) with modern equipment to reduce sustainment costs, high failure rates, and incompatibility with advanced HF waveforms. HFGCS is also integrating a Link 22 capability to enable resilient comms to operation center decision makers using high frequency radio. Beyond these upgrades, FY 2027 funding will also support ongoing HF modernization efforts, including implementing robust waveforms and techniques to increase network resiliency and reliability. It will also address diminishing manufacturing sources and material shortages (DMSMS) and obsolescence by procuring replacements or identifying alternative solutions for aging or obsolete components. Finally, it will fund hardware updates and integration to meet mandated cybersecurity requirements. The High Frequency Global Antenna Replacement program replaces antennas across the enterprise that have degraded after over 35 years of operation in harsh climate conditions. This project prioritizes locations based on need and operational requirements while also addressing DMSMS and obsolescence for critical antenna components. Finally, FY 2027 funding will also cover program support costs including program management and administration, engineering, cybersecurity initiatives, travel, operational testing, and technical interchanges. PE 0305158F TACTICAL TERMINAL (TT) No FY 2027 funding requested. PE 0102325F Advanced Early Warning System (AEWS) FY25 funding is required to purchase equipment and infrastructure to enable new Satellite Communications waveform interoperability and Link-22 capable radios to ensure the smooth transition from the legacy Link-11 tactical data link capable of fulfilling many of its mission operations LI 837190 - Radio Equipment Air Force UNCLASSIFIED Page 3 of 15 P-1 Line #51 Volume 1 - 565 === page 602 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 837190 / Radio Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Tactical Terminal MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 6.258 14.077 0.000 - 0.000 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 6.258 14.077 0.000 - 0.000 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 6.258 14.077 0.000 - 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Tactical Terminal (TT) Cost Recurring Cost (†) - - - 0.156 34 5.304 0.160 53 8.480 - - 0.000 - - - - - 0.000 Subtotal: Recurring Cost - - - - - 5.304 - - 8.480 - - 0.000 - - - - - 0.000 Subtotal: Hardware - Tactical Terminal (TT) Cost - - - - - 5.304 - - 8.480 - - 0.000 - - - - - 0.000 2.537 - - - - - - - - - Tactical Terminal Software - Tactical Terminal (TT) Integration Cost Recurring Cost Tactical Receive Segment (TRS) Integration with Tactical Terminal - - - - - - 2.537 Subtotal: Recurring Cost - - - - - - - - 2.537 - - - - - - - - - Subtotal: Software - Tactical Terminal (TT) Integration Cost - - - - - - - - 2.537 - - - - - - - - - 0.954 3.060 3.060 - - - - - - - - - 1 Support - Tactical Terminal Support Cost Program Support Costs (PSC) - - - 0.954 Subtotal: Support - Tactical Terminal Support Cost - - - - - 0.954 - - 3.060 - - - - - - - - - Gross/Weapon System Cost - - - - - 6.258 - - 14.077 - - 0.000 - - - - - 0.000 (†) 1 1 indicates the presence of a P-5a LI 837190 - Radio Equipment Air Force UNCLASSIFIED Page 4 of 15 P-1 Line #51 Volume 1 - 566 === page 603 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Cost Elements (†) O O C P-1 Line Item Number / Title: 837190 / Radio Equipment FY Contractor and Location Method/Type or Funding Vehicle Item Number / Title [DODIC]: Tactical Terminal Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) Tactical Terminal (†) 2025 Various / Various MIPR AFLCMC Hanscom AFB Jan 2025 Apr 2026 34 0.156 Y Tactical Terminal (†) 2026 Various / Various MIPR AFLCMC Hanscom AFB Mar 2026 Dec 2026 53 0.160 Y RFP Issue Date indicates the presence of a P-21 LI 837190 - Radio Equipment Air Force UNCLASSIFIED Page 5 of 15 P-1 Line #51 Volume 1 - 567 === page 604 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 837190 / Radio Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Tactical Terminal Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Tactical Terminal 1 2025 AF 34 0 34 1 2026 AF 53 0 53 A - - - - - - - - - - - - - - 5 A O C T LI 837190 - Radio Equipment Air Force - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #51 M A R A P R M A Y 10 10 - J U N 9 0 J U L A U G - 53 S E P Volume 1 - 568 === page 605 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 837190 / Radio Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Tactical Terminal Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Tactical Terminal 1 2025 AF 34 34 0 1 2026 AF 53 0 53 0 O C T LI 837190 - Radio Equipment Air Force N O V 10 D E C 10 J A N 10 F E B 10 M A R 10 A P R 3 M A Y 0 J U N J U L A U G UNCLASSIFIED Page 7 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #51 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 569 === page 606 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 837190 / Radio Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Item Number / Title [DODIC]: Tactical Terminal Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 53 53 53 1 Various - Various ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 1 Manufacturing PLT 6 Total After Oct 1 9 15 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 837190 - Radio Equipment Air Force UNCLASSIFIED Page 8 of 15 P-1 Line #51 Volume 1 - 570 === page 607 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 837190 / Radio Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: High Frequency Radio Systems MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 34.752 35.355 36.874 - 36.874 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 34.752 35.355 36.874 - 36.874 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 34.752 35.355 36.874 - 36.874 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Hardware - Antenna Replacement Cost Cost Recurring Cost HFGCS Station Antenna - - - 2.370 Antenna Site Support - - - 0.425 Subtotal: Recurring Cost - - - - - - - - - Replacements (†) Subtotal: Hardware Hardware - Antenna Replacement Cost Cost 3 7.110 2.833 1 0.425 0.480 7.535 - - - 7.535 - - - - 0.250 3 8.500 3.489 3 1 0.480 0.125 8.980 - - 8.980 - - 1 0.250 0.850 1 3.658 2.250 - - 10.467 - - - 3.489 0.125 - - - 0.125 10.592 - - - - - 10.592 10.592 - - - - - 10.592 1 0.850 - - - 0.850 1 2.250 - - - 2.250 - - - - - 16.920 - - - 16.920 - - - - - 2.137 - - - 2.137 1 3 1 10.467 0.125 Hardware - Hardware - Scope Command/Radio Network Infrastructure Cost Cost Recurring Cost Unified Capabilities/Audio Communications Functionality (UC/ ACF) - - - - HF Modernization - - - 4.834 1 4.834 3.658 Scanning Receiver Modernization - - - 3.297 1 3.297 - HPA Replacement - - - 4.739 1 4.739 5.561 1 5.561 16.920 RT2200A Install/ Fielding - - - 10.305 1 10.305 13.792 1 13.792 - Link 22 Install/Fielding - - - - - - - 2.137 LI 837190 - Radio Equipment Air Force - - - UNCLASSIFIED Page 9 of 15 1 1 P-1 Line #51 1 0.850 1 2.250 - 1 - 16.920 - 1 2.137 Volume 1 - 571 === page 608 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 837190 / Radio Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: High Frequency Radio Systems MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) Electronic Data Access (EDA) Installation FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) - - - - - - - - - 0.250 - - - - - 23.175 - - 23.261 - - - - - - 23.175 - - 23.261 - Direct Mission Support (DMS) - - - - - 1.661 - - 1.331 1.373 Management Services Contractor Services - - - - - 1.797 - - 1.206 Management Services Other Government Costs - - - - - 0.584 - - Subtotal: Support - Support DMS/MS Cost Cost - - - - - 4.042 - Gross/Weapon System Cost - - - - - 34.752 - Subtotal: Recurring Cost Subtotal: Hardware - Hardware - Scope Command/Radio Network Infrastructure Cost Cost FY 2027 OOC Total Cost Qty (Each) ($ M) 1 Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) 0.250 - - - 0.250 1 0.250 - 22.407 - - - - - 22.407 - 22.407 - - - - - 22.407 1 1.373 - - - 1.373 1 1.373 1.508 1 1.508 - - - 1.508 1 1.508 0.577 0.994 1 0.994 - - - 0.994 1 0.994 - 3.114 - - 3.875 - - - - - 3.875 - 35.355 - - 36.874 - - - - - 36.874 Support - Support - DMS/MS Cost Cost Remarks: 1) Due to different levels of complexity, differences in equipment to be updated and length of required time necessary for modification the total cost will fluctuate between fiscal years. 2) Differences in site specific setup (due to variations between mission specific needs and differences in site type will drive differences in site specific requirements (e.g., time required, hardware required, and software required). This makes quantification impossible, as there is no single baseline to produce a quantity against. (†) indicates the presence of a P-5a LI 837190 - Radio Equipment Air Force UNCLASSIFIED Page 10 of 15 P-1 Line #51 Volume 1 - 572 === page 609 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Cost Elements O O C HFGCS Station Antenna (†) Replacements HFGCS Station Antenna (†) Replacements HFGCS Station Antenna (†) Replacements (†) P-1 Line Item Number / Title: 837190 / Radio Equipment Item Number / Title [DODIC]: High Frequency Radio Systems FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) 2025 Long Wave Inc. / Oklahoma City, OK Various AFLCMC Tinker AFB Oct 2024 Apr 2026 3 2.370 Y 2026 Long Wave Inc. / Oklahoma City, OK Various AFLCMC Tinker AFB Oct 2025 Apr 2027 3 2.833 Y 2027 Long Wave Inc. / Oklahoma City, OK Various AFLCMC Tinker AFB Oct 2026 Apr 2028 3 3.489 Y Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 837190 - Radio Equipment Air Force UNCLASSIFIED Page 11 of 15 P-1 Line #51 Volume 1 - 573 === page 610 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 837190 / Radio Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: High Frequency Radio Systems Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P HFGCS Station Antenna Replacements 1 2025 AF 3 0 3 1 2026 AF 3 0 3 1 2027 AF 3 0 3 A - - - - - - - - - - - - - - - - - A - - - - - - 3 0 - - - - - - 3 3 O C T LI 837190 - Radio Equipment Air Force - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #51 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 574 === page 611 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 837190 / Radio Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: High Frequency Radio Systems Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E HFGCS Station Antenna Replacements 1 2025 AF 3 3 0 1 2026 AF 3 0 3 - - - - - - 0 1 2027 AF 3 0 3 A - - - - - - O C T LI 837190 - Radio Equipment Air Force N O V D E C J A N F E B M A R 3 0 A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 15 S E P O C T N O V D E C J A N F E B P-1 Line #51 M A R 3 A P R 0 M A Y J U N J U L A U G S E P Volume 1 - 575 === page 612 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 837190 / Radio Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Item Number / Title [DODIC]: High Frequency Radio Systems Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 3 3 3 1 Long Wave Inc. - Oklahoma City, OK ALT Prior to Oct 1 ALT After Oct 1 1 Reorder Manufacturing PLT 1 18 Total After Oct 1 ALT Prior to Oct 1 19 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 Remarks: 1.) Differences in site specific setup (due to variations between mission specific needs and differences in site type will drive differences in site specific requirements (e.g., time required, hardware required, and software required). This makes quantification impossible as there is no single baseline to produce a quantity against. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 837190 - Radio Equipment Air Force UNCLASSIFIED Page 14 of 15 P-1 Line #51 Volume 1 - 576 0 === page 613 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 837190 / Radio Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Atmospheric Early Warning System MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 2.502 1.298 0.000 - 0.000 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 2.502 1.298 0.000 - 0.000 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 2.502 1.298 0.000 - 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Atmospheric Early Warning System Cost Recurring Cost - - - 0.069 36 2.502 - - 1.298 - - 0.000 - - - - - 0.000 Subtotal: Recurring Cost AEWS - - - - - 2.502 - - 1.298 - - 0.000 - - - - - 0.000 Subtotal: Hardware Atmospheric Early Warning System Cost - - - - - 2.502 - - 1.298 - - 0.000 - - - - - 0.000 Gross/Weapon System Cost - - - - - 2.502 - - 1.298 - - 0.000 - - - - - 0.000 LI 837190 - Radio Equipment Air Force UNCLASSIFIED Page 15 of 15 P-1 Line #51 Volume 1 - 577 === page 614 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 578 === page 615 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 837300 / Base Comm Infrastructure Equip / BSA 7: Organization and Base ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - Procurement Quantity (Units in Each) - - - Gross/Weapon System Cost ($ in Millions) - 63.965 67.015 Less PY Advance Procurement ($ in Millions) - - - Net Procurement (P-1) ($ in Millions) - 63.965 67.015 Plus CY Advance Procurement ($ in Millions) - - - Total Obligation Authority ($ in Millions) - 63.965 67.015 158.113 - - 158.113 - - 158.113 - 158.113 158.113 158.113 152.051 152.051 152.051 141.254 141.254 141.254 336.209 336.209 336.209 To FY 2031 Complete 347.595 347.595 347.595 - Total 1,266.202 1,266.202 1,266.202 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The FY 2026 spend plan amount for Other Procurement, Air Force includes 67,015 thousand of discretionary and 1,400 thousand of mandatory (reconciliation) for a total of 68,415. PE 0102325F Atmospheric Early Warning System (AEWS) - Joint Surveillance System (JSS) Funding provides procurement and installation of aging AN/FPS-117 radomes supporting the AEWS JSS. The AEWS provides continuous aircraft and cruise missile early warning against possible threats, Specific aircraft data position, detection from low-mid-high-altitude targets, Identification Friend or Foe (IFF) in support of Homeland Defense, PACOM, USNORTHCOM, NORAD and FAA missions. Radars are remotely monitored & controlled, Unattended/minimally attended. AEWS Program provides sustainment support for AN/FPS-117 Long Range Radar (250 NM range/100k alt) & AN/FPS-124 Short Range Radar (70 NM range/15k alt) systems to maintain the defense command and control for Alaska, Canada and Hawaii. PE 0102412F Atmospheric Early Warning System (AEWS) - North Warning System (NWS) Funding provides replacement of aging AN/FPS-117 and AN/FPS-124 radomes supporting the AEWS NWS. The AEWS provides continuous aircraft and cruise missile early warning against possible threats, Specific aircraft data position, detection from low-mid-high-altitude targets, Identification Friend or Foe (IFF) in support of Homeland Defense, PACOM, USNORTHCOM, NORAD and FAA missions. Radars are remotely monitored & controlled, Unattended/minimally attended. AEWS Program provides sustainment support for AN/FPS-117 Long Range Radar (250 NM range/100k alt) & AN/FPS-124 Short Range Radar (70 NM range/15k alt) systems to maintain the defense command and control for Alaska, Canada and Hawaii. PE 0207439F Electronic Warfare Integrated Reprogramming (EWIR) DISTRIBUTED MISSION OPERATIONS AND THREAT CHANGE ANALYSIS: New start. Conducted by the 453rd Electronic Warfare Squadron (453 EWS), EWIR provides analytical capabilities and reachback support for DoW acquisition , planning and mission execution activities. These capabilities ensure electromagnetic warfare (EW) systems and integrated combat platforms correctly recognize and respond to enemy, friendly and noncombatant systems operating within the electromagnetic environment. The effort includes funds used to procure specialized information technology systems used to identify electromagnetic spectrum emitter changes that impact combat defensive and electronic warfare systems and to conduct detailed analyses in support of operational mission planning, tactics, techniques and procedures (TTP) development, acquisition and test and evaluation. These analyses provide the means to understand the performance of their systems in hostile environments, directly impacting the survivability of combat-coded USAF aircraft and aircrews. PE 0208535F Collateral Equipment - Tactical Air Forces LI 837300 - Base Comm Infrastructure Air Force UNCLASSIFIED Page 1 of 25 P-1 Line #52 Volume 1 - 579 === page 616 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 837300 / Base Comm Infrastructure Equip / BSA 7: Organization and Base ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Collateral Equipment - Tactical Air Forces PE 0208535F/EIC FP15: This program procures equipment to support the European Infrastructure Consolidation (EIC), providing equipment to fit-out the Joint Intelligence Analytic Center/NATO Intelligence Fusion Center (JIAC/ NIFC)complex at RAF Molesworth. The JIAC/NIFC operational facilities at RAF Molesworth will consolidate European intelligence functions critical to the USEUCOM warfighting mission. Collateral Equipment was a FY23 new start. PE 0308611F Communications and Information Technology AFSPC Communications Infrastructure Equipment: Funds enable timely and assured delivery of data, video and voice communications supporting a wide range of Air Force organizations and decision makers, providing the space enterprise with a robust communications infrastructure. This funding supports life cycle management of space communications network(s) in order to maintain consistent, compatible, and interoperable capability in support of multi-domain operations. Funds are also needed to provide C4I support for military construction projects, a multitude of smaller, individual communications, computer, air traffic control and weather instrumentation connectivity needs. This funding will be executed by HQ AFSPC or associated space units. PE 0401319F VC-25B The VC-25B Program, formerly known as the Presidential Aircraft Recapitalization (PAR) Program, will replace the Presidential VC-25A fleet as it reaches the end of its planned 30-year life-cycle. The VC-25B Program Office will deliver a new fleet of aircraft to meet the requirements for the President to execute the duties of Commander-in-Chief, Head of State, and Chief Executive. PE 0804701F ADVANCED PILOT TRAINING T-7A Advanced Pilot Training (APT) T-7A (formerly known as T-X) Program will develop, test, acquire, and sustain an affordable, agile, and integrated APT System consisting of 351 aircraft, Ground Based Training System, Maintenance Training System, support, infrastructure, and personnel to meet Air Education and Training Command's (AETC) training needs. PE 0205219F MQ-9 UAV MQ-9 Reaper Squadron Operations Centers (SOCs) enable Remote Split Operations (RSO), provide critical mission data and tasking information to the aircrew and disseminate and/or exchange mission data with decision-makers and the intelligence community. PE 0303004F EIT CONNECT Air Combat Command (ACC) Lead Command Base Communications Infrastructure: E and I supports enterprise network capability and life cycle replacement of common user communications systems, AF Network Defensive capabilities, as well as Installation Emergency Management (IEM) infrastructure. E and I funds support communications availability and reliability, providing consistent, compatible, and interoperable capability through advanced technology and architecture. Installations include network communications infrastructure, fiber optic and copper cabling, and associated manhole duct systems for cable projects. In FY2021, PE 0207436F (Engineering and Installation Support AF), efforts were transferred to PE 0303004F (EIT Connect), in order to align resources under the Enterprise Information Technology portfolio. PE 0303005F EIT END USER DEVICES In FY2021, PE 0208550F (Information Technology Services Management - Tactical Air Forces), efforts were transferred to PE 0303005F (EIT End Devices), in order to align resources under the Enterprise Information Technology portfolio. In FY2021, PE 0305550F (Information Technology Services Management - Other), efforts were transferred to PE 0303005F (EIT End Devices), in order to align resources under the Enterprise Information Technology portfolio. a. Air Force District Washington (AFDW) Base Communications Network Equipment: Funds procure wide and local area network hardware (i.e., servers, routers, hubs and network systems) at Joint Base Anacostia-Bolling, Joint Base Andrews, and Headquarters Air Force. This program invests in office automation systems and computer networks in order to procure high-quality, high-speed connections to both public and classified network, and equipment required to react to emerging and emergency mission requirements in the National Capital Region (NCR). b.Air Force Materiel Command (AFMC) Base Communications infrastructure Equipment: Funding allows AFMC to support AF operations by sustaining critical cyber systems that provide timely and assured delivery of data and voice communications for organizations at nine AFMC installations with 100,000 personnel. Funding directly supports the warfighter on a 24/7 operational basis by providing AFMC the ability to deliver cyber capabilities to sustain aircraft sortie generation rates, weapon systems availability, system operational testing, and timely acquisition of equipment parts. This program is vital for AFMC's life cycle LI 837300 - Base Comm Infrastructure Air Force UNCLASSIFIED Page 2 of 25 P-1 Line #52 Volume 1 - 580 === page 617 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 837300 / Base Comm Infrastructure Equip / BSA 7: Organization and Base ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A management of network servers, service desk, repair of critical communications infrastructure, routers, ductwork, cables, Land Area Networks (LANs), voice and data switches, and Mass Notifications and Land Mobile Radio (LMR) systems. Funding allows for end-of-life replacement of end building node network, data and voice hardware that complies with AF cyber architecture enterprise standards. In FY2021, PE 0708550F (Information Technology Services Management - Logistics), efforts were transferred to PE 0303005F (EIT End Devices), in order to align resources under the Enterprise Information Technology portfolio. c.Air Force District Washington (AFDW) Base Communications Infrastructure Equipment: Funds support network infrastructure replacements and AFDW's classified and unclassified networks. These efforts directly support strategic decision making, execution of operations, and support to US senior leadership including the POTUS, SECWAR, CJCS, and the CSAF. This is a continuing requirement. In FY2021, PE 0408550F (Information Technology Services Management - Mobility Air Forces), efforts were transferred to PE 0303005F (EIT End Devices), in order to align resources under the Enterprise Information Technology portfolio. d. Air Force Special Operations Command (AFSOC) Base Communications Infrastructure Equipment: This equipment supports more than 18,000 AFSOC active-duty, Air Force Reserve, Air National Guard and civilian personnel and allow AFSOC to meet the mission of presenting combat ready forces to conduct and support global special operations missions. Funds end of life IT connect infrastructure to provide dial tone and Internet access across the AFSOC enterprise. This is a continuing requirement, where aging legacy components are no longer funded through other cyber portfolios and each MAJCOM must replace these critical components. e. Pacific Air Forces (PACAF) Base Communications Infrastructure Equipment: PACAF network equipment and life cycle replacement of base information technology systems supports base operations, command-wide connectivity, and transformation efforts. The large geographic separation between PACAF units significantly raises the importance of a robust communications infrastructure to ensure war fighter access to secure voice, data, and video systems. f. Air Combat Command (ACC) Base Communications Infrastructure Equipment: ACC base communications funds support life cycle management of network servers, routers, ductwork, cables, LANs, voice and data switches, Land Mobile Radio (LMR) systems, and end building node hardware. This infrastructure meets the requirements of ACC's 143,000 active-duty, Air Force Reserve, Air National Guard and civilian personnel at 11 major bases and 7 associated units throughout the United States. g. USAFE-AFAFRICA Base Communications Infrastructure Equipment: USAFE-AFAFRICA base communications funding supports the acquisition, and installation of base network infrastructures, especially C2 communications, located at USAFE-AFAFRICA Main Operating Bases (MOBs) and Geographically Separated Units (GSUs) consisting of a HQ, one numbered Air Force, seven MOBs and 137 GSUs. Specific critical base communications infrastructure provide support for Headquarters, Warfighting Numbered Air Force and Operational wings, flight support, emergency actions, and the operational planning, delivering, sustaining, integrating, and managing of USAF communications capabilities, networks, and applications in the USEUCOM and USAFRICOM theaters based on geographical combatant command orders and plans. Base communications infrastructure is required to support the European Infrastructure Consolidation (EIC) which is an OSW-directed process to restructure basing of forces within the European Command (EUCOM) Area of Responsibility (AOR). Base communications infrastructure is also required to support increased rotational presence of air, ground and sea forces throughout Europe, increased and added bilateral and multilateral exercises and training events with U.S. allies and partners in Europe, improved infrastructure to allow for greater responsiveness across Europe, enhanced prepositioning of U.S. equipment across Europe, and intensified our efforts to build partner capacity for newer NATO members and partners. h. Air Education and Training Command (AETC) Base Communications Infrastructure Equipment: Funds support base-approved and MAJCOM-validated communications requirements as identified in base communications blueprints. These requirements include flying and technical training, education, recruiting, and accession mission, command and control, as well as first responder services at all 11 AETC bases. This is a continuing requirement. PE 0505550F Information Technology Services Management - AFR Air Force Reserve Command (AFRC) Base Communications Infrastructure Equipment: Funds provide for recapitalization, and support of AFRC base communications infrastructure. AFRC is an AF MAJCOM consisting of a HQ, three Numbered Air Forces (NAFs), 45 flying wings/groups and more than 40 GSUs; Air Reserve Personnel Center (ARPC) and the Major Command Coordinating Center (MCCC). Funding supports AFR-wide programs providing base communications infrastructure consistency. Funding provides AFR-wide hardware and software purchases, thus ensuring the deployment of consistent, compatible, and interoperable technology and architecture. This is a continuing requirement. In accordance with Section 1815 of the FY2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the armed forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. PE 0508550F Information Technology Services Management - ANG LI 837300 - Base Comm Infrastructure Air Force UNCLASSIFIED Page 3 of 25 P-1 Line #52 Volume 1 - 581 === page 618 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 837300 / Base Comm Infrastructure Equip / BSA 7: Organization and Base ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Air National Guard (ANG) Base Communications Infrastructure Equipment: Funding supports the operations, maintenance, and sustainment of IT components, infrastructure, and processes enabling effective operations and defense of the ANG enterprise portion of the Air Force Network (AFNet). Funds provide for IT life cycle support for 90 ANG Main Operating Bases (MOB), 153 GSUs, and the 299th Cyber Security Control (CSCS) weapon system. Funds support ANG-wide base communications infrastructure projects consistent with AF IT standards and for compatibility of the ANG enterprise with the AF and Department of War (DoW) centralized networks. A major component of this funding is to support the procurement and implementation of a robust Installation Notification and Warning System (INWS) that provides Giant Voice, Indoor Alerts, Telephone call/text alerts, software for computer alerts, and other alerting methods to meet DoW and Federal warning requirements for all ANG bases. This is a continuing requirement. In accordance with Section 1815 of the FY2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the armed forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. PE 0305155F Theater Nuclear Weapons Storage and Security System The Weapon Storage and Security System (WS3) is a NATO funded, US maintained/operated system of systems for secure storage and sustainment of U.S. weapons deployed in Europe. The WS3 Service Life Extension Program addresses obsolescence issues with the Alarm Communication and Display (AC and D) system, updates the encryption algorithm to Advanced Encryption Standard (AES) 256 for communicating alarm messages to the monitoring facilities, replaces obsolete analogue components with modern Internet Protocol (IP)-based components (does NOT connect to the internet), replaces old communication cables with modern fiber optic cables capable of handling modern digital bandwidth, replaces out-of-production assessment cameras, replaces antiquated Monitoring Facility Operator trainers, adds video security capabilities, and improves sustainability; it will extend system service life to 2050. LI 837300 - Base Comm Infrastructure Air Force UNCLASSIFIED Page 4 of 25 P-1 Line #52 Volume 1 - 582 === page 619 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 837300 / Base Comm Infrastructure Equip / BSA 7: Organization and Base ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 Information Technology Services Management - Tactical Air Forces A - / - - / 1.351 - / 0.000 - / 0.000 - / - - / 0.000 P-5 EIT END USER DEVICES A - / - - / 23.507 - / 25.869 - / 16.528 - / - - / 16.528 P-5 Information Technology Services Management - AFR A - / - - / 0.380 - / 0.389 - / 0.405 - / - - / 0.405 P-5 Cyberspace Systems (ANG) A - / - - / 12.054 - / 11.964 - / 10.680 - / - - / 10.680 P-5 Collateral Equipment - Tactical Air Forces A - / - - / 0.000 - / 0.000 - / 92.423 - / - - / 92.423 P-5 Atmospheric Early Warning System A - / - - / 3.737 - / 4.614 - / 4.881 - / - - / 4.881 P-5 Theater Nuclear Weapon Storage & Security System P-5a A - / - - / 0.000 - / 0.000 - / 23.326 - / - - / 23.326 P-5 North Warning System (NWS) P-5a, P-21 A - / - - / 5.262 - / 6.180 - / 6.504 - / - - / 6.504 P-5 Engineering and Installation - 38th Group A - / - - / 17.674 - / 17.999 - / 3.366 - / - - P-40 Total Gross/Weapon System Cost - / - - / 63.965 - / 67.015 / 158.113 - / - P-5a, P-21 - - / 3.366 / 158.113 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: PE 0102325F Atmospheric Early Warning System (AEWS) - Joint Surveillance System (JSS) FY27 Funding provides procurement and installation of aging AN/FPS-117 radomes supporting the AEWS JSS. Replacement of the JSS portion of AN/FPS-117 fleet of radomes (16 total) within the PACAF theater with commercially available composite radomes is required. Funding supports procurement of manufacturing, installation/integration, site surveys, government acceptance, travel, shipping, over & above if required, spare hardware, technical reports, and contractor services personnel to support the logistics and validation of radomes. Existing radomes are 20 years beyond their design life, resulting in excessive delamination, increased maintenance costs, and risk to the radar systems. A prior radome collapse at an AEWS site due to snow underscores a catastrophic deficiency and personnel safety risk. Radome replacement is crucial to ensuring continued operational readiness and preventing potential loss of life. PE 0102412F Atmospheric Early Warning System (AEWS) - North Warning System (NWS) FY27 Funding provides replacement of aging AN/FPS-117 and AN/FPS-124 radomes supporting the AEWS NWS. Replacement of the NWS portion of AN/FPS-117 fleet of radomes (10 total) and AN/FPS-124 fleet of radomes (36 total) within the PACAF and Canadian theaters with commercially available composite radomes is required. Funding supports procurement of manufacturing, installation/integration, site surveys, government acceptance, travel, shipping, over & above if required, spare hardware, technical reports, and contractor services personnel to support the logistics and validation of radomes. Existing radomes are 20 years beyond their design life, resulting in excessive delamination, increased maintenance costs, and risk to the radar systems. A prior radome collapse at an Atmospheric Early Warning System (AEWS) site due to snow underscores a catastrophic deficiency and personnel safety risk. Radome replacement is crucial to ensuring continued operational readiness and preventing potential loss of life. PE 0804701F ADVANCED PILOT TRAINING T-7A - P-40A Advanced Pilot Training T-7A Facility Communication Equipment funding for an antenna farm for T-7A data links. No funding requested in FY 2025 and FY 2026. PE 0205219F MQ-9 UAV MQ-9 Reaper Remotely Piloted Aircraft (RPA) Squadron Operations Centers (SOC): LI 837300 - Base Comm Infrastructure Air Force No FY26 funds requested. UNCLASSIFIED Page 5 of 25 P-1 Line #52 Volume 1 - 583 === page 620 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 837300 / Base Comm Infrastructure Equip / BSA 7: Organization and Base ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A PE 0303004F EIT CONNECT Air Combat Command (ACC) Lead Command Base Communications Infrastructure: E and I supports enterprise network capability and life cycle replacement of common user communications systems, AF Network Defensive capabilities, as well as Installation Emergency Management (IEM) infrastructure. E and I funds support communications availability and reliability, providing consistent, compatible, and interoperable capability through advanced technology and architecture. Installations include network communications infrastructure, fiber optic and copper cabling, and associated manhole duct systems for cable projects. FY2024 funding procures equipment to support enterprise network capability and life cycle replacement of common user communication systems. No FY26 funds requested. PE 0303005F EIT END USER DEVICES FY 2026 funds supports: a. Air Force District Washington (AFDW) Base Communications Network Equipment: FY 2026 funds procure wide and local area network hardware (i.e., servers, routers, hubs and network systems) at Joint Base Anacostia-Boling, Joint Base Andrews, and Headquarters Air Force. This program invests in office automation systems and computer networks in order to procure high-quality, high-speed connections to both public and classified network, and equipment required to react to emerging and emergency mission requirements in the National Capital Region (NCR). b. Air Force Materiel Command (AFMC) Communications Infrastructure Equipment: FY 2026 funds supported command wide and base approved, MAJCOM validated communications requirements. These provide base life cycle management of AFMC's classified and unclassified network server consolidation, Land Mobile Radio (LMR) systems, routers, voice and data switches, ductwork, cabling, and end building node hardware that support UC and communications infrastructure. Procurements include VoIP solutions to replace the obsolete telephone switches and communications infrastructure. c. Air Force District Washington (AFDW) Base Communications Infrastructure Equipment: FY 2026 funds procured wide and local area network at Joint Base Anacostia-Bolling, Joint Base Andrews, and Headquarters Air Force. This program invests in office automation systems and computer networks to support high-quality, high-speed connections to public and classified networks in support of National Capitol Region (NCR) mission requirements. d. Air Force Special Operations Command (AFSOC) Base Communications Infrastructure Equipment: FY 2026 funds were used by AFSOC to recapitalize data, voice, and video equipment supporting AFSOC forces organized under three active-duty wings, one reserve wing, one National Guard wing, two overseas groups, and several direct reporting units. e. Pacific Air Forces (PACAF) Base Communications Infrastructure Equipment: FY 2025 funding supports PACAF's acquisition and installation of Unified Capabilities (UC) and communications infrastructure at remote and Geographically Separated Unit (GSU) locations. Procurements include VoIP solutions to replace the obsolete telephone switches and communications infrastructure supporting C2 for deploying squadrons at these (flex base) locations. This capability directly supports COMPACAF's flexible basing strategy for the Pacific region. f. Air Combat Command (ACC) Base Communications Infrastructure Equipment: FY 2026 funds continued life cycle support of base communications infrastructure at ACC bases and replaces outdated network voice and data equipment hardware to meet mission requirements of ACC's C2 and mission support users. g. USAFE-AFAFRICA Base Communications Infrastructure Equipment: FY 2026 funds replaced USAFE's outdated Land Mobile Radio distribution systems between intrabase communication networks/nodes thereby eliminating bottlenecks in trunking systems across USAFE-AFAFRICA Main Operating Bases (MOBs) and GSUs. Base network infrastructure procurements meet network communications requirements for USAFE-AFAFRICA users at MOBS and GSUs. Additionally, FY 2022 funds procure communications infrastructure in support of the EIC and procure equipment for additional long haul communication support to support increased rotational presence of air, ground and sea forces throughout Europe. h. Air Education and Training Command (AETC) Base Communications Infrastructure Equipment: FY 2026 funds were used to continue the process of replacing AETC legacy base LAN infrastructure originally designed to carry data only in order to comply with the increased reliability required under Assured Service LAN (ASLAN) as other services (e.g., voice, enterprise LMR) are transitioned to the LAN. FY24 Overseas Operational Requirements funding (3.458M) procure base communication infrastructure. PE 0505550F Information Technology Services Management - AFR Air Force Reserve Command (AFRC) Base Communications Infrastructure Equipment: LI 837300 - Base Comm Infrastructure Air Force UNCLASSIFIED Page 6 of 25 P-1 Line #52 Volume 1 - 584 === page 621 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 837300 / Base Comm Infrastructure Equip / BSA 7: Organization and Base ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A FY2026 funds support data, voice, and video projects to promote compatibility with the AF "Active" component architectures. In addition to funding AFR-wide programs. Funds also acquire equipment for life cycle support of critical base-level communications infrastructure requirements. PE 0508550F Information Technology Services Management - ANG Air National Guard (ANG) Base Communications Infrastructure Equipment: FY2026 funds continue to support installation of command purchased information technology and software to maintain a consistent, compatible, and interoperable infrastructure and architecture. This functionality ensures compatibility of ANG networks with the AF Enterprise. PE 0305155F Theater Nuclear Weapons Storage and Security System FY2027 funds implements national security presidential guidance and combatant commander recommendations following the 2018 Nuclear Posture Review. This program is tightly integrated with several high priority programs required for F-35 bed-down and requires full funding to meet program milestones. Additionally, this program is required to support NATO plans and the evolving threat environment. LI 837300 - Base Comm Infrastructure Air Force UNCLASSIFIED Page 7 of 25 P-1 Line #52 Volume 1 - 585 === page 622 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 837300 / Base Comm Infrastructure Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Information Technology Services Management - Tactical Air Forces MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 1.351 0.000 0.000 - 0.000 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 1.351 0.000 0.000 - 0.000 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 1.351 0.000 0.000 - 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Information Technology Services Management - Tactical Air Forces Cost Recurring Cost Base Communications Infrastructure Equipment for Tactical Air Forces - - - - - 1.351 - - 0.000 - - 0.000 - - - - - 0.000 Subtotal: Recurring Cost - - - - - 1.351 - - 0.000 - - 0.000 - - - - - 0.000 Subtotal: Hardware Information Technology Services Management Tactical Air Forces Cost - - - - - 1.351 - - 0.000 - - 0.000 - - - - - 0.000 Gross/Weapon System Cost - - - - - 1.351 - - 0.000 - - 0.000 - - - - - 0.000 LI 837300 - Base Comm Infrastructure Air Force UNCLASSIFIED Page 8 of 25 P-1 Line #52 Volume 1 - 586 === page 623 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 837300 / Base Comm Infrastructure Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: EIT END USER DEVICES MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 23.507 25.869 16.528 - 16.528 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 23.507 25.869 16.528 - 16.528 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 23.507 25.869 16.528 - 16.528 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - EIT END USER DEVICES - ACC Cost Recurring Cost EIT Package - ACC - - - - - 18.101 - - 20.034 - - 16.528 - - - - - 16.528 Subtotal: Recurring Cost - - - - - 18.101 - - 20.034 - - 16.528 - - - - - 16.528 Subtotal: Hardware - EIT END USER DEVICES - ACC Cost - - - - - 18.101 - - 20.034 - - 16.528 - - - - - 16.528 Hardware - EIT END USER DEVICES - AETC Cost Recurring Cost EIT Package - AETC - - - - - 5.406 - - 5.835 - - - - - - - - - Subtotal: Recurring Cost - - - - - 5.406 - - 5.835 - - - - - - - - - Subtotal: Hardware - EIT END USER DEVICES AETC Cost - - - - - 5.406 - - 5.835 - - - - - - - - - Gross/Weapon System Cost - - - - - 23.507 - - 25.869 - - 16.528 - - - - - 16.528 LI 837300 - Base Comm Infrastructure Air Force UNCLASSIFIED Page 9 of 25 P-1 Line #52 Volume 1 - 587 === page 624 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 837300 / Base Comm Infrastructure Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Information Technology Services Management - AFR MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 0.380 0.389 0.405 - 0.405 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.380 0.389 0.405 - 0.405 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.380 0.389 0.405 - 0.405 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Information Technology Services Management - AFR Cost Recurring Cost (†) - - - 0.380 0.380 0.389 0.389 0.405 0.405 - - - 0.405 Subtotal: Recurring Cost - - - - - 0.380 - - 0.389 - - 0.405 - - - - - 0.405 Subtotal: Hardware Information Technology Services Management - AFR Cost - - - - - 0.380 - - 0.389 - - 0.405 - - - - - 0.405 Gross/Weapon System Cost - - - - - 0.380 - - 0.389 - - 0.405 - - - - - 0.405 ITSM - AFR (†) 1 1 1 1 0.405 indicates the presence of a P-5a LI 837300 - Base Comm Infrastructure Air Force UNCLASSIFIED Page 10 of 25 P-1 Line #52 Volume 1 - 588 === page 625 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 FY Contractor and Location ITSM - AFR 2025 TBD / TBD MIPR AFRC Mar 2025 Jun 2025 1 0.380 Y Jan 2025 ITSM - AFR 2026 TBD / TBD MIPR AFRC Mar 2026 Jun 2026 1 0.389 Y Jan 2026 ITSM - AFR 2027 TBD / TBD MIPR AFRC Mar 2027 Jun 2027 1 0.405 Y Jan 2027 (†) (†) Item Number / Title [DODIC]: Information Technology Services Management - AFR Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 837300 / Base Comm Infrastructure Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 837300 - Base Comm Infrastructure Air Force UNCLASSIFIED Page 11 of 25 P-1 Line #52 Volume 1 - 589 === page 626 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 837300 / Base Comm Infrastructure Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Information Technology Services Management - AFR Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Fiscal Year 2026 Calendar Year 2025 O C T N O V D E C J A N F E B O C T N O V D E C J A N F E B M A R A P R M A Y J U N Calendar Year 2026 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E ITSM - AFR 1 2025 AF 1 0 1 A - LI 837300 - Base Comm Infrastructure Air Force M A R A P R M A Y 1 J U N 0 UNCLASSIFIED Page 12 of 25 P-1 Line #52 Volume 1 - 590 === page 627 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 837300 / Base Comm Infrastructure Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Information Technology Services Management - AFR Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E ITSM - AFR 1 2025 AF 1 1 0 0 LI 837300 - Base Comm Infrastructure Air Force UNCLASSIFIED Page 13 of 25 P-1 Line #52 Volume 1 - 591 === page 628 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 837300 / Base Comm Infrastructure Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Item Number / Title [DODIC]: Information Technology Services Management - AFR Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1 TBD - TBD 1-8-5 For 2027 MAX For 2027 1 1 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 837300 - Base Comm Infrastructure Air Force UNCLASSIFIED Page 14 of 25 P-1 Line #52 Volume 1 - 592 0 === page 629 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 837300 / Base Comm Infrastructure Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Cyberspace Systems (ANG) MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 12.054 11.964 10.680 - 10.680 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 12.054 11.964 10.680 - 10.680 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 12.054 11.964 10.680 - 10.680 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Information Technology Services Management - ANG Cost Recurring Cost Installation Notification Warning System (INWS) - - - 0.583 16 9.320 0.581 16 9.291 - - 9.602 - - - - - 9.602 Voice Switching Systems (VSS) - - - 0.547 5 2.734 - - 2.673 - - 1.078 - - - - - 1.078 Subtotal: Recurring Cost - - - - - 12.054 - - 11.964 - - 10.680 - - - - - 10.680 Subtotal: Hardware Information Technology Services Management ANG Cost - - - - - 12.054 - - 11.964 - - 10.680 - - - - - 10.680 Gross/Weapon System Cost - - - - - 12.054 - - 11.964 - - 10.680 - - - - - 10.680 LI 837300 - Base Comm Infrastructure Air Force UNCLASSIFIED Page 15 of 25 P-1 Line #52 Volume 1 - 593 === page 630 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 837300 / Base Comm Infrastructure Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Collateral Equipment - Tactical Air Forces MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 0.000 0.000 92.423 - 92.423 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.000 0.000 92.423 - 92.423 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.000 0.000 92.423 - 92.423 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Collateral Equipment - Tactical Air Forces Cost Recurring Cost Collateral Equipment Tactical Air Forces - - - - - 0.000 - - 0.000 - - 92.423 - - - - - 92.423 Subtotal: Recurring Cost - - - - - 0.000 - - 0.000 - - 92.423 - - - - - 92.423 Subtotal: Hardware Collateral Equipment Tactical Air Forces Cost - - - - - 0.000 - - 0.000 - - 92.423 - - - - - 92.423 Gross/Weapon System Cost - - - - - 0.000 - - 0.000 - - 92.423 - - - - - 92.423 LI 837300 - Base Comm Infrastructure Air Force UNCLASSIFIED Page 16 of 25 P-1 Line #52 Volume 1 - 594 === page 631 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 837300 / Base Comm Infrastructure Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Atmospheric Early Warning System MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 3.737 4.614 4.881 - 4.881 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 3.737 4.614 4.881 - 4.881 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 3.737 4.614 4.881 - 4.881 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Atmospheric Early Warning System Cost Recurring Cost AEWS JSS Radome Replacement - - - 3.737 3.737 1.500 4.500 1.622 4.866 - - - 1.622 Subtotal: Recurring Cost - - - - - 3.737 - - 4.500 - - 4.866 - - - - - 4.866 Subtotal: Hardware Atmospheric Early Warning System Cost - - - - - 3.737 - - 4.500 - - 4.866 - - - - - 4.866 1 3 3 3 4.866 Support - Atmospheric Early Warning System Cost - - - - - - - - 0.114 - - 0.015 - - - - - 0.015 Subtotal: Support Atmospheric Early Warning System Cost PMA - - - - - - - - 0.114 - - 0.015 - - - - - 0.015 Gross/Weapon System Cost - - - - - 3.737 - - 4.614 - - 4.881 - - - - - 4.881 LI 837300 - Base Comm Infrastructure Air Force UNCLASSIFIED Page 17 of 25 P-1 Line #52 Volume 1 - 595 === page 632 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 837300 / Base Comm Infrastructure Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Theater Nuclear Weapon Storage & Security System MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 0.000 0.000 23.326 - 23.326 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.000 0.000 23.326 - 23.326 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.000 0.000 23.326 - 23.326 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Theater Nuclear Weapon Storage & Security System Cost Recurring Cost Vault Modernization (†) - - - - - 0.000 - - 0.000 0.499 39 19.461 - - - 0.499 39 19.461 Subtotal: Recurring Cost - - - - - 0.000 - - 0.000 - - 19.461 - - - - - 19.461 Subtotal: Hardware Theater Nuclear Weapon Storage & Security System Cost - - - - - 0.000 - - 0.000 - - 19.461 - - - - - 19.461 Program (VMP) Kits Support - Theater Nuclear Weapon Storage and Security System Cost Program Management Administration - - - - - - - - - - - 3.865 - - - - - 3.865 Subtotal: Support - Theater Nuclear Weapon Storage and Security System Cost - - - - - - - - - - - 3.865 - - - - - 3.865 Gross/Weapon System Cost - - - - - 0.000 - - 0.000 - - 23.326 - - - - - 23.326 (†) indicates the presence of a P-5a LI 837300 - Base Comm Infrastructure Air Force UNCLASSIFIED Page 18 of 25 P-1 Line #52 Volume 1 - 596 === page 633 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Cost Elements Vault Modernization Program (VMP) Kits O O C P-1 Line Item Number / Title: 837300 / Base Comm Infrastructure FY Contractor and Location Method/Type or Funding Vehicle 2027 TBD / Kirtland Air Force Base Various LI 837300 - Base Comm Infrastructure Air Force Item Number / Title [DODIC]: Theater Nuclear Weapon Storage & Security System Location of PCO Award Date Date of First Delivery AFNWC Oct 2026 Sep 2028 UNCLASSIFIED Page 19 of 25 P-1 Line #52 Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) 39 0.499 RFP Issue Date Y Volume 1 - 597 === page 634 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 837300 / Base Comm Infrastructure Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: North Warning System (NWS) MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 5.262 6.180 6.504 - 6.504 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 5.262 6.180 6.504 - 6.504 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 5.262 6.180 6.504 - 6.504 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - North Warning System (NWS) Cost Recurring Cost AEWS NWS Radome - - - - - 5.262 1.025 Subtotal: Recurring Cost - - - - - 5.262 - Subtotal: Hardware - North Warning System (NWS) Cost - - - - - 5.262 Replacement (†) 6 6.150 1.197 - 6.150 - - - 6.150 5 5.984 - - - 1.197 5 5.984 - 5.984 - - - - - 5.984 - - 5.984 - - - - - 5.984 Support - North Warning System (NWS) Cost - - - - - - - - 0.030 - - 0.520 - - - - - 0.520 Subtotal: Support - North Warning System (NWS) Cost PMA - - - - - - - - 0.030 - - 0.520 - - - - - 0.520 Gross/Weapon System Cost - - - - - 5.262 - - 6.180 - - 6.504 - - - - - 6.504 Remarks: PMA covers two contractor position to support Rodomes effort. (†) indicates the presence of a P-5a LI 837300 - Base Comm Infrastructure Air Force UNCLASSIFIED Page 20 of 25 P-1 Line #52 Volume 1 - 598 === page 635 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Cost Elements AEWS NWS Radome (†) Replacement AEWS NWS Radome (†) Replacement (†) O O C P-1 Line Item Number / Title: 837300 / Base Comm Infrastructure Item Number / Title [DODIC]: North Warning System (NWS) FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) 2026 TBD / TBD TBD AFLCMC Hill AFB May 2026 Nov 2026 6 1.025 Y Jul 2025 2027 TBD / TBD TBD AFLCMC Hill AFB May 2027 Nov 2027 5 1.197 Y Oct 2026 Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 837300 - Base Comm Infrastructure Air Force UNCLASSIFIED Page 21 of 25 P-1 Line #52 Volume 1 - 599 === page 636 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 837300 / Base Comm Infrastructure Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: North Warning System (NWS) Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P AEWS NWS Radome Replacement 1 2026 AF 6 0 6 1 2027 AF 5 0 5 A - - - - - - 1 1 1 1 1 1 0 A - O C T LI 837300 - Base Comm Infrastructure Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 22 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #52 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 600 5 === page 637 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 837300 / Base Comm Infrastructure Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: North Warning System (NWS) Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E AEWS NWS Radome Replacement 1 2026 AF 6 6 0 1 2027 AF 5 0 5 0 O C T LI 837300 - Base Comm Infrastructure Air Force 1 N O V 1 D E C 1 J A N 1 F E B 1 M A R 0 A P R M A Y J U N J U L A U G UNCLASSIFIED Page 23 of 25 S E P O C T N O V D E C J A N F E B P-1 Line #52 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 601 === page 638 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 837300 / Base Comm Infrastructure Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 Item Number / Title [DODIC]: North Warning System (NWS) Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 TBD - TBD MSR For 2027 1-8-5 For 2027 MAX For 2027 2 4 6 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 5 Manufacturing PLT 8 Total After Oct 1 6 14 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 837300 - Base Comm Infrastructure Air Force UNCLASSIFIED Page 24 of 25 P-1 Line #52 Volume 1 - 602 === page 639 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 837300 / Base Comm Infrastructure Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 7 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Engineering and Installation - 38th Group MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 17.674 17.999 3.366 - 3.366 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 17.674 17.999 3.366 - 3.366 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 17.674 17.999 3.366 - 3.366 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Engineering and Installation - 38th Group Cost Recurring Cost Engineering and Installation - - - - - 17.674 - - 17.999 3.366 3.366 - - - 3.366 Subtotal: Recurring Cost - - - - - 17.674 - - 17.999 - - 3.366 - - - - - 3.366 Subtotal: Hardware Engineering and Installation - 38th Group Cost - - - - - 17.674 - - 17.999 - - 3.366 - - - - - 3.366 Gross/Weapon System Cost - - - - - 17.674 - - 17.999 - - 3.366 - - - - - 3.366 LI 837300 - Base Comm Infrastructure Air Force UNCLASSIFIED Page 25 of 25 1 P-1 Line #52 1 3.366 Volume 1 - 603 === page 640 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 604 === page 641 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 838010 / Comm Elect Mods Equip / BSA 8: Modifications Program Elements for Code B Items: 0305114F ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0305114F Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - 0.000 73.147 76.034 65.222 28.437 64.222 77.586 - - - - 0.000 73.147 76.034 - - - 0.000 73.147 76.034 220.855 - - 220.855 - - 220.855 - 220.855 220.855 220.855 To FY 2031 Complete - - - - - 65.222 28.437 64.222 77.586 - - - - - - 65.222 28.437 64.222 77.586 - Total 605.503 605.503 605.503 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: PE 0102412F Atmospheric Early Warning System (AEWS) of systems. Joint Surveillance System (JSS) and North Warning System (NWS) within the Atmospheric Early Warning System (AEWS) of systems, continue to age and require innovative solutions to be implemented to combat obsolescence. These solutions include Digital Array Row Transceivers (DARTs), DART cable mod kit, data register bypass cables, Radar Data Processor (RDP) (S7 and Second Edition), Frequency Synthesizer technical refresh, and Local Controller Control Unit (LCCU) technical refreshes. These efforts are necessary to reduce reliance to ensure operational availability and compliance with Authority To Operate (ATO) requirements by resolving obsolete components, mitigation of Diminishing Manufacturing Sources and Material Shortages (DMSMS) and subsequent system performance issues. Deployment of the Archer Remote Sensing System is underway and requires funding to move from prototype to production. Modernization efforts are necessary to mitigate risks associated with the use of Commercial Off The Shelf (COTS) components. A&AS personnel are also necessary to manage workload associated with the complexity of acquiring a program developed using rapid prototyping and fielding strategies. PE 0102325F Atmospheric Early Warning System (AEWS) of systems. Joint Surveillance System (JSS) and North Warning System (NWS) within the Atmospheric Early Warning System (AEWS) of systems, continue to age and require innovative solutions to be implemented to combat obsolescence. These solutions include Digital Array Row Transceivers (DARTs), data register bypass cables, and Mission Software technical refreshes. These efforts are necessary to reduce reliance to ensure operational availability and compliance with Authority To Operate (ATO) requirements by resolving obsolete components, mitigation of Diminishing Manufacturing Sources and Material Shortages (DMSMS) and subsequent system performance issues. PE 0305114F Air Traffic Control and Landing Systems (ATCALS) - Low Cost Modifications Fixed base and deployable ATCALS low cost modifications are initiated to resolve Diminishing Manufacturing Source (DMS) issues and minor system deficiencies/improvements identified through the ATCALS Weapon System Review-Executive Council (WSR-EC), policy TO 00-35D-54 Deficiency Reports, and Material Improvement initiatives. Supporting activities include, but are not limited to annual low cost modifications unforeseen sustainment activities, obsolescence scans, Diminishing Manufacturing Sources/Material Shortage studies/resolution, Technical Support Services (TSS) which includes Engineering Support, Site Specific Issue Resolution, Trouble Reports, Investigation Requests, and the Product Support Library. The return on investment for these low-cost modifications will be realized immediately through decreased unscheduled depot and field level maintenance, and enhanced performance and operational safety. Operational availability of the ATCALS system will no longer meet required uptime without these modifications. LI 838010 - Comm Elect Mods Air Force UNCLASSIFIED Page 1 of 40 P-1 Line #53 Volume 1 - 605 === page 642 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 838010 / Comm Elect Mods Equip / BSA 8: Modifications ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: 0305114F Other Related Program Elements: 0305114F Line Item MDAP/MAIS Code: N/A PE 030514F ATCALS - Air Traffic Navigation, Integration and Coordination System (ATNAVICS) ATNAVICS provides mobile, terminal area, air traffic control radar surveillance and communications during adverse weather and night conditions. The legacy (1970's-era) systems have has reached end-oflife and will be completely decommissioned by 2028. ATNAVICS will provide a limited material solution with two refurbished Army ATNAVICS systems until the 2035 timeframe when replacement by the Multifunction Tactical Radar System (MTRS), which is in development, is planned to reach FOC. During that timeframe ATNAVICS will require mitigation of obsolescence and diminishing manufacturing source issues. PE 0305137F National Airspace System (NAS) - Low-Cost Modifications NAS is a former ACAT IC Joint FAA and DoW program which transitioned from Production to the Operations and Support (O&S) phase in 2017. Since then, NAS has been responsible for the overall sustaining, maintaining, and modification efforts of NAS systems. NAS low-cost modifications are initiated to resolve DMS issues and system deficiencies/improvements identified through the Weapon System ReviewExecutive Council (WSR-EC), policy TO 00-35D-54 Deficiency Reports, and Material Improvement initiatives. Supporting activities include but are not limited to annual low-cost modifications for unforeseen sustainment activities, obsolescence scans, DMS/Material Shortage studies/resolution, Technical Support Services (TSS) which includes Engineering Support, Site Specific Issue Resolution, Trouble Reports, Investigation Requests, and the Product Support Library. PE 0305137F National Airspace System (NAS) Reliability and Maintainability Modifications The NAS program is a former ACAT IC Joint DoD/FAA program which entered the operations and support phase in 2017. The FAA is the overall lead for the NAS program and the Air Force is the lead for the DoW. Full rate production deliveries began in 2005 and completed in 2018. Program focus is now on mitigation of Diminishing Manufacturing Sources, Obsolescence issues, and implementation of system upgrades required to maintain standard configuration across the DoW and FAA. This allows the DoW to maintain a common baseline with the FAA and save support costs for a separate DoW baseline. NAS systems include the Digital Airport Surveillance Radar (DASR) and the DoW Advanced Automation System (DAAS) also known as the Standard Terminal Automation Replacement System (STARS). PE 0102417F Over the Horizon (OTHR) Backscatter Radar The Tactical Multi-Mission Over the Horizon Radar (TACMOR) program will consist of a complete Over-the-Horizon Radar (OTHR) system composed of a large-scale high power Transmit Array site, a Receiver Array site to receive the reflected energy from the Transmit Array, and instrumentation to measure ionospheric conditions to optimize performance. The majority of the radar system and components are acquired with RDT&E funding to develop and test the prototype system. The Joint Emerging/Urgent Operational Need (JEON) EC-0015 is a Request for Deep Persistent Warning and Surveillance. FY2027 identifies 137 million procurement funds for a second relocatable OTHR in EUCOM. A technical realignment of funds is required to execute the acquisition strategy to deliver the capability. A request will be submitted to realign 10 million procurement funds to RDT&E. PE 0201890F Service Support to Combatant HQ/HQ Support-NORTHCOM This project executes a comprehensive modernization of Army Airspace Command and Control (A2C2) and Joint Operations Center (JOC) radio architectures to ensure resilient, secure voice communications across all echelons within the Joint Operating Area (JOA) in support of critical national security missions. To meet the rigorous demands of current operations, this initiative overhauls legacy systems through the installation of necessary antennas, the strategic relocation of hardware and radio sets, and the integration of radio gateways. A critical component of this physical and network infrastructure upgrade is the integration of mission assurance hardware alongside high-speed commercial internet services, which are securely routed over a black core transport network. This includes transitioning its emission profile from a legacy Frequency Division Multiple Access (FDMA) framework to a more efficient and robust Time Division Multiple Access (TDMA) architecture. These technical enhancements directly bolster Command and Control (C2) capabilities by ensuring adequate Beyond Line of Sight (BLOS) secure voice communications, which are essential for maintaining an effective Primary, Alternate, Contingency, and Emergency (PACE) plan in support of assigned Operations Plans (OPLANs). To address command-directed priorities and mitigate identified Limiting Factors (LIMFACs), the modernization effort mandates the expansion of Headquarters-managed RO-X radios and the fielding of an advanced radio gateway solution LI 838010 - Comm Elect Mods Air Force UNCLASSIFIED Page 2 of 40 P-1 Line #53 Volume 1 - 606 === page 643 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 838010 / Comm Elect Mods Equip / BSA 8: Modifications Program Elements for Code B Items: 0305114F ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0305114F Line Item MDAP/MAIS Code: N/A to consolidate radio capabilities for streamlined C2 node access. These capabilities are necessary to enable and buttress the C2 requirements of dispersed subordinate joint units, providing the foundational communications infrastructure required to support Continuity of Government (COG), Continuity of Operations (COOP), Homeland Defense (HD), and Defense Support to Civil Authorities (DSCA) mission priorities. Funding in this Weapon System Code may also be used to fund NORAD/NOTHCOM, USINDOPACOM and EUCOM as required. Secondary Distribution AF Quantity Total Obligation Authority AFNG Quantity Total: Secondary Distribution FY 2027 Base FY 2026 - - 71.617 65.359 FY 2027 OOC - 214.615 FY 2027 Total - FY 2028 - 214.615 FY 2029 FY 2030 FY 2031 - - - - 35.741 20.412 20.779 21.195 - - - - - - - - - 1.530 4.160 4.160 - 4.160 2.080 - - - Quantity - - - - - - - - - Total Obligation Authority - 6.515 2.080 - 2.080 2.080 - - - Quantity - - - - - - - - - 73.147 76.034 39.901 20.412 20.779 21.195 Total Obligation Authority AFR FY 2025 Total Obligation Authority LI 838010 - Comm Elect Mods Air Force 220.855 UNCLASSIFIED Page 3 of 40 - 220.855 P-1 Line #53 Volume 1 - 607 === page 644 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 838010 / Comm Elect Mods Equip / BSA 8: Modifications Program Elements for Code B Items: 0305114F ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0305114F Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Subexhibits ID CD P-5a, P-21 A - / - - / 8.852 - / 5.990 - / 7.196 - / - - A - / - - / 6.196 - / 0.000 - / 0.813 - / - - / 0.813 B - / - - / 12.131 - / 9.489 - / 11.214 - / - - / 11.214 - - / 146.443 P-5 Atmospheric Early Warning System P-5 Communications - 416L P-5 North Warning System (NWS) P-5 Over-the-Horizon Backscatter Radar A - / - - / 0.000 - / 9.172 / 146.443 - / - P-5 Service Support to Combatant HQ/HQ Support - NORTHCOM A - / - - / 0.000 - / 0.000 - / 1.300 - / - - / 1.300 P-3a 2 / Air Traffic Navigation, Integration and Coordination System (ATNAVICS) (Reliability & Maintainability) B - / - / - - / 3.554 - / 3.566 - / 0.000 - / 3.566 P-3a 1 / ATCALS Low Cost Mods (PE 0305114F) (Reliability & Maintainability) A - / - - / 1.801 - / 2.068 - / 2.396 - / 0.000 - / 2.396 P-3a 1 / NAS Low Cost Mods (Reliability & Maintainability) A - / - - / 1.763 - / 2.031 - / 2.348 - / 0.000 - / 2.348 P-3a 3 / National Airspace System (NAS) Modifications (Reliability & Maintainability) (Reliability & Maintainability) A - / 0.000 - / 42.404 - / 43.730 - / 45.579 - P-40 Total Gross/Weapon System Cost - / 0.000 - / 73.147 - / 76.034 - / 220.855 P-5a, P-21 Exhibits Schedule Exhibit Type Title* MDAP/ MAIS Code - - / 7.196 / 0.000 - / 45.579 / - - / 220.855 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Subexhibits ID CD P-5a, P-21 A - / - - / - - / - - / - - / - - / - A - / - - / - - / - - / - - / - - / - B - / - - / - - / - - / - - / - - / - P-5 Atmospheric Early Warning System P-5 Communications - 416L P-5 North Warning System (NWS) P-5 Over-the-Horizon Backscatter Radar A - / - - / - - / - - / - - / - - / - P-5 Service Support to Combatant HQ/HQ Support - NORTHCOM A - / - - / - - / - - / - - / - - / - P-3a 2 / Air Traffic Navigation, Integration and Coordination System (ATNAVICS) (Reliability & Maintainability) B - / - - / - - / 11.706 P-3a 1 / ATCALS Low Cost Mods (PE 0305114F) (Reliability & Maintainability) A P-3a 1 / NAS Low Cost Mods (Reliability & Maintainability) A P-3a 3 / National Airspace System (NAS) Modifications (Reliability & Maintainability) (Reliability & Maintainability) A P-40 Total Gross/Weapon System Cost P-5a, P-21 - / 4.586 - / 0.000 - / 0.000 - / 2.204 - / 2.247 - / 2.289 - / 2.335 - / - - / 15.340 - / 2.161 - / 2.203 - / 2.245 - / 2.290 - / - - / 15.041 - / 30.950 - / 15.962 - / 16.245 - / 16.570 - / - - / 211.440 - / 65.222 - / 28.437 - / 64.222 - / 77.586 - / - - / 605.503 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: PE 0102412F Joint Surveillance System (JSS), North Warning System (NWS) and Archer within the Atmospheric Early Warning System (AEWS) of systems. - FY 2027 will fund technical refresh efforts and procurement of components needed for these systems to maintain required Operational Availability (Ao) and meet lifecycle requirements. LI 838010 - Comm Elect Mods Air Force UNCLASSIFIED Page 4 of 40 P-1 Line #53 Volume 1 - 608 === page 645 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 03: Electronics and Telecommunications 838010 / Comm Elect Mods Equip / BSA 8: Modifications ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: 0305114F Other Related Program Elements: 0305114F Line Item MDAP/MAIS Code: N/A PE 0102325F Joint Surveillance System (JSS) and North Warning System (NWS) within the Atmospheric Early Warning System (AEWS) of systems - FY 2027 will fund technical refresh efforts and procurement of components needed for these systems to maintain required Operational Availability (Ao) and meet lifecycle requirements. PE 0305114F Air Traffic Control and Landing Systems (ATCALS) - Low Cost Modifications - FY 2027 funds continue ATCALS low cost modifications, to include installation and program support, as prioritized by the program office and the Weapon System Review Executive Committee (WSR-EC). PE 0305114F ATCALS - ATNAVICS - FY2027 funds procure obsolescence and diminishing manufacturing source kits for two systems. Funding includes installation and program support. PE 0305137F National Airspace System (NAS) FY 2027 funds: - Continue low cost modifications, to include installation and program support, as prioritized by the program office and the WSR-EC. - Continue life cycle replacement of obsolete components and mitigation of diminishing manufacturing sources for the Digital Airport Surveillance Radar (DASR), Standard Terminal Automation Replacement System (STARS), and integration of Automatic Protocol Exchange (APEX) kits to allow interoperability with host nation automation systems. Funding includes hardware, program support costs, and installation when required - reference the P-3a exhibit for details. PE 0102417F Over the Horizon (OTHR) Backscatter Radar - FY 2027 initiates the acquisition and procurement of an OTHR system in support of JEON EC-0015 and provides supporting infrastructure for TACMOR site security requirements. - Significant funding increase due to EUCOM request to acquire a second site for the JEON EC-0015 requirement. PE 0604281F Tactical Data Networks Enterprise -No funds request for budget year FY 2027. PE 0201890F Service Support to Combatant HQ/HQ Support-NORTCOM - FY2027 funding mitigates operational risk and eliminates communication dead zones by upgrading LMR coverage, improving radio waveforms, and resolving HF shortages to guarantee secure Beyond Line of Sight (BLOS) redundancy. By achieving this vital mission assurance outcome, the command replaces fragile legacy systems with a resilient architecture, ensuring seamless joint and interagency interoperability across the multidomain environment. In accordance with Section 1815 of the FY2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. Efforts with funding starting in FY 2028 through FY 2031 are summarized on the P-40. Not all details of this funding are included in this P-40 exhibit set. A summary of the excepted details is as follows: (a) (b) (c) (d) (e) LI 838010 - Comm Elect Mods Air Force FY 2028 Cost Delta: 25.321 million FY 2029 Cost Delta: 8.025 million FY 2030 Cost Delta: 43.443 million FY 2031 Cost Delta: 56.391 million FY Total Cost Delta: 351.976 million UNCLASSIFIED Page 5 of 40 P-1 Line #53 Volume 1 - 609 === page 646 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 838010 / Comm Elect Mods Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Atmospheric Early Warning System MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 8.852 5.990 7.196 - 7.196 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 8.852 5.990 7.196 - 7.196 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 8.852 5.990 7.196 - 7.196 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Atmospheric Early Warning System Cost Recurring Cost (†) - - - - - 8.852 0.139 43 5.977 0.114 63 7.182 - - - 0.114 63 7.182 Subtotal: Recurring Cost - - - - - 8.852 - - 5.977 - - 7.182 - - - - - 7.182 Subtotal: Hardware Atmospheric Early Warning System Cost - - - - - 8.852 - - 5.977 - - 7.182 - - - - - 7.182 AEWS-DARTS Support - Atmospheric Early Warning System Cost - - - - - - - - 0.013 - - 0.014 - - - - - 0.014 Subtotal: Support Atmospheric Early Warning System Cost AEWS PMA - - - - - - - - 0.013 - - 0.014 - - - - - 0.014 Gross/Weapon System Cost - - - - - 8.852 - - 5.990 - - 7.196 - - - - - 7.196 Secondary Distribution AF Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total - - - - - 8.852 5.990 7.196 - 7.196 - - - - - 8.852 5.990 7.196 - 7.196 indicates the presence of a P-5a LI 838010 - Comm Elect Mods Air Force UNCLASSIFIED Page 6 of 40 P-1 Line #53 Volume 1 - 610 === page 647 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 P-1 Line Item Number / Title: 838010 / Comm Elect Mods ID Code (A=Service Ready, B=Not Service Ready) : A LI 838010 - Comm Elect Mods Air Force Item Number / Title [DODIC]: Atmospheric Early Warning System MDAP/MAIS Code: UNCLASSIFIED Page 7 of 40 P-1 Line #53 Volume 1 - 611 === page 648 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 FY Contractor and Location (†) 2026 Lockheed Martin / Syracuse, NY. Various AFLCMC Hill AFB Jan 2026 Feb 2028 43 0.139 Y (†) 2027 Lockheed Martin / Syracuse, NY. Various AFLCMC Hill AFB Dec 2026 Jan 2028 63 0.114 Y AEWS-DARTS AEWS-DARTS (†) Item Number / Title [DODIC]: Atmospheric Early Warning System Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 838010 / Comm Elect Mods Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 838010 - Comm Elect Mods Air Force UNCLASSIFIED Page 8 of 40 P-1 Line #53 Volume 1 - 612 === page 649 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 838010 / Comm Elect Mods Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Atmospheric Early Warning System Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P AEWS-DARTS 1 2026 AF 1 2027 AF (1) 43 0 43 63 0 63 A O C T LI 838010 - Comm Elect Mods Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 40 S E P O C T N O V - - - - - - - - - - 43 A - - - - - - - - - - 63 D E C J A N F E B P-1 Line #53 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 613 === page 650 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 838010 / Comm Elect Mods Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Atmospheric Early Warning System Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E AEWS-DARTS 1 2026 AF 1 2027 AF (1) 43 0 43 - - - - 63 0 63 - - - 40 O C T LI 838010 - Comm Elect Mods Air Force N O V D E C J A N 2 41 23 F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 40 S E P O C T N O V D E C J A N F E B P-1 Line #53 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 614 === page 651 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 838010 / Comm Elect Mods Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 Item Number / Title [DODIC]: Atmospheric Early Warning System Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 20 30 41 1 Lockheed Martin - Syracuse, NY. ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 1 Manufacturing PLT 3 Total After Oct 1 13 16 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (1) Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. LI 838010 - Comm Elect Mods Air Force UNCLASSIFIED Page 11 of 40 P-1 Line #53 Volume 1 - 615 === page 652 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 838010 / Comm Elect Mods Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Communications - 416L MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 6.196 0.000 0.813 - 0.813 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 6.196 0.000 0.813 - 0.813 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 6.196 0.000 0.813 - 0.813 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Communications - 416L Cost Recurring Cost Comms Equipment - - - - - 6.196 - - 0.000 - - 0.813 - - - - - 0.813 Subtotal: Recurring Cost - - - - - 6.196 - - 0.000 - - 0.813 - - - - - 0.813 Subtotal: Hardware Communications - 416L Cost - - - - - 6.196 - - 0.000 - - 0.813 - - - - - 0.813 Gross/Weapon System Cost - - - - - 6.196 - - 0.000 - - 0.813 - - - - - 0.813 Secondary Distribution AF Quantity Total Obligation Authority Total: Secondary Distribution LI 838010 - Comm Elect Mods Air Force Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total - - - - - 6.196 0.000 0.813 - 0.813 - - - - - 6.196 0.000 0.813 - 0.813 UNCLASSIFIED Page 12 of 40 P-1 Line #53 Volume 1 - 616 === page 653 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 838010 / Comm Elect Mods Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: North Warning System (NWS) MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 12.131 9.489 11.214 - 11.214 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 12.131 9.489 11.214 - 11.214 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 12.131 9.489 11.214 - 11.214 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - North Warning System NWS Cost Recurring Cost ARCHER - - - 0.149 3 0.447 0.172 3 0.517 0.199 3 0.596 - - - 0.199 3 0.596 - - - 0.079 147 11.684 0.139 43 5.977 0.113 62 7.011 - - - 0.113 62 7.011 RDP-SE - - - - - - 0.042 21 0.882 0.062 20 1.240 - - - 0.062 20 1.240 FS-SE - - - - - - 0.089 21 1.869 0.143 16 2.288 - - - 0.143 16 2.288 Subtotal: Recurring Cost - - - - - 12.131 - - 9.245 - - 11.135 - - - - - 11.135 Subtotal: Hardware - North Warning System NWS Cost - - - - - 12.131 - - 9.245 - - 11.135 - - - - - 11.135 NWS-DART (†) Support - North Warning System (NWS) Cost - - - - - - - - 0.244 - - 0.079 - - - - - 0.079 Subtotal: Support - North Warning System (NWS) Cost DARTS PMA - - - - - - - - 0.244 - - 0.079 - - - - - 0.079 Gross/Weapon System Cost - - - - - 12.131 - - 9.489 - - 11.214 - - - - - 11.214 Secondary Distribution AF Quantity Total Obligation Authority Total: LI 838010 - Comm Elect Mods Air Force Quantity FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total - - - - - 12.131 9.489 11.214 - 11.214 - - - - - UNCLASSIFIED Page 13 of 40 P-1 Line #53 Volume 1 - 617 === page 654 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 P-1 Line Item Number / Title: 838010 / Comm Elect Mods ID Code (A=Service Ready, B=Not Service Ready) : B Secondary Distribution Secondary Distribution (†) Total Obligation Authority Item Number / Title [DODIC]: North Warning System (NWS) MDAP/MAIS Code: FY 2025 FY 2027 Base FY 2026 12.131 9.489 FY 2027 OOC 11.214 FY 2027 Total - 11.214 indicates the presence of a P-5a LI 838010 - Comm Elect Mods Air Force UNCLASSIFIED Page 14 of 40 P-1 Line #53 Volume 1 - 618 === page 655 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 FY Contractor and Location (†) 2025 Lockheed Martin / Syracuse, NY Various AFLCMC Hill AFB (†) 2026 Lockheed Martin / Syracuse, NY Various AFLCMC Hill AFB Jan 2026 Feb 2028 43 0.139 N Jun 2025 (†) 2027 Lockheed Martin / Syracuse, NY Various AFLCMC Hill AFB Dec 2026 Jan 2030 62 0.113 N Jun 2025 NWS-DART NWS-DART NWS-DART (†) Item Number / Title [DODIC]: North Warning System (NWS) Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 838010 / Comm Elect Mods Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Sep 2025 Dec 2027 147 0.079 N Jun 2025 Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 838010 - Comm Elect Mods Air Force UNCLASSIFIED Page 15 of 40 P-1 Line #53 Volume 1 - 619 === page 656 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 838010 / Comm Elect Mods Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: North Warning System (NWS) Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P NWS-DART 1 2025 AF 147 0 147 1 2026 AF (2) 43 0 43 1 2027 AF (3) 62 0 62 A - - - - - - - - - - - - 147 A - - - - - - - - - 43 62 O C T LI 838010 - Comm Elect Mods Air Force - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 40 S E P O C T N O V D E C J A N F E B P-1 Line #53 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 620 === page 657 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 838010 / Comm Elect Mods Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: North Warning System (NWS) Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P NWS-DART 1 2025 AF 147 0 147 - - - - - - - - - - - - - - 12 12 12 12 12 12 12 12 12 13 26 1 2026 AF (2) 43 0 43 - - - - - - - - - - - - - - - - 1 - - - - - - - 42 1 2027 AF (3) 62 0 62 A - - - - - - - - - - - - - - - - - - - - - 62 O C T LI 838010 - Comm Elect Mods Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 40 S E P O C T N O V D E C J A N F E B P-1 Line #53 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 621 === page 658 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 838010 / Comm Elect Mods Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: North Warning System (NWS) Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E NWS-DART 1 2025 AF 147 121 26 13 13 1 2026 AF (2) 43 1 42 - - 1 2027 AF (3) 62 0 62 - - O C T LI 838010 - Comm Elect Mods Air Force N O V 0 4 4 D E C 4 J A N 4 F E B 4 M A R 4 A P R 4 M A Y 4 J U N 4 J U L 4 A U G UNCLASSIFIED Page 18 of 40 2 S E P 0 O C T N O V D E C 5 J A N 4 F E B P-1 Line #53 4 M A R 4 A P R 4 M A Y 1 J U N 40 J U L A U G S E P Volume 1 - 622 === page 659 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 838010 / Comm Elect Mods Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 Item Number / Title [DODIC]: North Warning System (NWS) Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 20 30 40 1 Lockheed Martin - Syracuse, NY ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 1 Manufacturing PLT 3 Total After Oct 1 37 40 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (2) (3) Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. LI 838010 - Comm Elect Mods Air Force UNCLASSIFIED Page 19 of 40 P-1 Line #53 Volume 1 - 623 === page 660 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 838010 / Comm Elect Mods Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Over-the-Horizon Backscatter Radar MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 Procurement Quantity (Units in Each) - - - Gross/Weapon System Cost ($ in Millions) - 0.000 9.172 Less PY Advance Procurement ($ in Millions) - - - Net Procurement (P-1) ($ in Millions) - 0.000 9.172 Plus CY Advance Procurement ($ in Millions) - - - Total Obligation Authority ($ in Millions) - 0.000 9.172 FY 2027 Base FY 2027 OOC - - 146.443 FY 2027 Total - - - 146.443 - 146.443 - - - 146.443 - 146.443 - - 146.443 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - JEON EC-0015 Cost Non Recurring Cost Transmitters/ Recievers - - - - - 0.000 - - - Subtotal: Non Recurring Cost 137.000 - - - - - 0.000 - - - - Subtotal: Hardware - JEON EC-0015 Cost - - - - - 0.000 - - - 1 137.000 - - - 137.000 1 137.000 - 137.000 - - - - - 137.000 - - 137.000 - - - - - 137.000 Hardware - Over the Horizon Backscatter Radar Cost Recurring Cost Transmit Spares - - - - - 0.000 - - - - - - - - - - - - Down range Sounder - - - - - - - - 0.000 - - - - - - - - - Subtotal: Recurring Cost - - - - - 0.000 - - 0.000 - - - - - - - - - Subtotal: Hardware - Over the Horizon Backscatter Radar Cost - - - - - 0.000 - - 0.000 - - - - - - - - - Ancillary Equipment - Over-the-Horizon Backscatter Radar Cost Non Recurring Cost Water treatment support equipment - - - - - - - - 1.434 - - 1.485 - - - - - 1.485 Perimeter security equipment and fence maintenance - - - - - - - - 1.384 - - 1.413 - - - - - 1.413 Telecommunications equipment - - - - - - - - 0.599 - - 0.611 - - - - - 0.611 LI 838010 - Comm Elect Mods Air Force UNCLASSIFIED Page 20 of 40 P-1 Line #53 Volume 1 - 624 === page 661 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 838010 / Comm Elect Mods Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Over-the-Horizon Backscatter Radar MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) infrastructure maintenance Electrical and power generation system component installation and maintenance - - - - - - - - 3.505 - - 3.579 - - - - - 3.579 Antenna Array Foundation bolt equipment installation and maintenance - - - - - - - - 1.155 - - 1.222 - - - - - 1.222 Secure Compound Fencing/Gates - - - - - - - - 1.095 - - 1.133 - - - - - 1.133 Subtotal: Non Recurring Cost - - - - - - - - 9.172 - - 9.443 - - - - - 9.443 Subtotal: Ancillary Equipment - Over-theHorizon Backscatter Radar Cost - - - - - - - - 9.172 - - 9.443 - - - - - 9.443 Gross/Weapon System Cost - - - - - 0.000 - - 9.172 - - 146.443 - - - - - 146.443 Remarks: Prior year FY23 funds executed in this WSC but associated with PE 0102412F North Warning systems and transitions to association with Over the Horizon Backscatter Radar in FY24. FY26 and FY27 Ancillary Equipment Infrastructure includes the procurement of Security Support Infrastructure, Fencing, Foundation/Slabs, Generators/Transformers, and Telecommunications. Secondary Distribution AF Quantity Total Obligation Authority Total: Secondary Distribution LI 838010 - Comm Elect Mods Air Force Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 - - 0.000 9.172 - - 0.000 9.172 UNCLASSIFIED Page 21 of 40 FY 2027 OOC 146.443 146.443 P-1 Line #53 FY 2027 Total - 146.443 146.443 Volume 1 - 625 === page 662 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 838010 / Comm Elect Mods Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Service Support to Combatant HQ/HQ Support - NORTHCOM MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 0.000 0.000 1.300 - 1.300 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.000 0.000 1.300 - 1.300 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.000 0.000 1.300 - 1.300 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Service Support to Combatant HQ/HQ Support - NORTHCOM Cost Recurring Cost Service Support - - - - - 0.000 - - 0.000 - - 1.300 - - - - - 1.300 Subtotal: Recurring Cost - - - - - 0.000 - - 0.000 - - 1.300 - - - - - 1.300 Subtotal: Hardware - Service Support to Combatant HQ/ HQ Support - NORTHCOM Cost - - - - - 0.000 - - 0.000 - - 1.300 - - - - - 1.300 Gross/Weapon System Cost - - - - - 0.000 - - 0.000 - - 1.300 - - - - - 1.300 Secondary Distribution AF Quantity Total Obligation Authority Total: Secondary Distribution LI 838010 - Comm Elect Mods Air Force Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total - - - - - 0.000 0.000 1.300 - 1.300 - - - - - 0.000 0.000 1.300 - 1.300 UNCLASSIFIED Page 22 of 40 P-1 Line #53 Volume 1 - 626 === page 663 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 838010 / Comm Elect Mods Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 ID Code (A=Service Ready, B=Not Service Ready) : B Resource Summary Modification Number / Title: 2 / Air Traffic Navigation, Integration and Coordination System (ATNAVICS) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - - 3.554 3.566 0.000 3.566 4.586 0.000 0.000 - - 11.706 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - - 3.554 3.566 0.000 3.566 4.586 0.000 0.000 - - 11.706 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - - 3.554 3.566 0.000 3.566 4.586 0.000 0.000 - - 11.706 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Justification DESCRIPTION: Air Traffic Control Navigation, Integration, and Coordination System (ATNAVICS) provides mobile, terminal area, air traffic control radar surveillance and communications during adverse weather and night conditions. The legacy (1970's-era) systems have has reached end-of-life and will be completely decommissioned in FY 2028. ATNAVICS provides a limited material solution with two refurbished Army systems. Modification funding supports modernization efforts and addresses diminishing manufacturing source issues necessary to keep these systems operational until the 2035 timeframe when the Multi-function Tactical Radar System (MTRS) is planned to reach Full Operational Capability. JUSTIFICATION: FY 2027 funds procure obsolescence and diminishing manufacturing source kits for two systems. Funding includes installation and program support. Milestone/Development Status ATNAVICS Version 10 is an upgraded version of Army system. System has completed testing and is now in sustainment and operational life cycle phase. Secondary Distribution AF Total: Secondary Distribution FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 Quantity - - - - - - - - - Total Obligation Authority - 3.554 3.566 - 3.566 4.586 - - - Quantity - - - - - - - - - Total Obligation Authority - 3.554 3.566 0.000 3.566 4.586 0.000 0.000 - LI 838010 - Comm Elect Mods Air Force UNCLASSIFIED Page 23 of 40 P-1 Line #53 Volume 1 - 627 === page 664 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 838010 / Comm Elect Mods Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 ID Code (A=Service Ready, B=Not Service Ready) : B MDAP/MAIS Code: Models of Systems Affected: ATCALS Modification Type: Reliability & Maintainability Prior Years Financial Plan Modification Number / Title: 2 / Air Traffic Navigation, Integration and Coordination System (ATNAVICS) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: Obsolescence/DMS Mitigation Kits A Kits Recurring Obsolescence/DMS Mitigation Kits:INSTALL KITS Group A (Active) - / - - / - - / - - / - - / 2.772 - / - - / - - / 2.772 - / - - / - - - / - - / - - / - - / - Modification Item 1 of 1: Obsolescence/DMS Mitigation Kits - / - - / - Subtotal: Installation - / - - Subtotal: Recurring Subtotal: Obsolescence/DMS Mitigation Kits Subtotal: Procurement, All Modification Items 2 / 2.772 2 / 2.747 - / - 2 / 2.747 2 / 3.708 - / - - / - - / - - / - - / 2.747 - / - - / 2.747 - / 2.747 - / - - / 2.747 / 2.772 - / 2.747 - / - - - / 0.429 - / 0.466 - / - - / 0.429 - / 0.466 - / - 2 / 0.353 2 / 0.353 - / - / - 2 / 0.353 2 / 0.353 - - 3.554 3.566 6 / 9.227 - / 3.708 - / - - / - - / - - / - - / 9.227 - / 3.708 - / - - / - - / - - / - - / 9.227 / 2.747 - / 3.708 - / - - / - - / - - / - - / 9.227 - / 0.466 - / 0.488 - / - - / - - / - - / - - / 1.383 - / 0.466 - / 0.488 - / - - / - - / - - / - - / 1.383 2 / 0.353 2 / 0.390 - / - - / - - / - - / - 6 / 1.096 / - 2 / 0.353 2 / 0.390 - / - - / - - / - - / - 6 / 1.096 0.000 3.566 4.586 - 11.706 Support (All Modification Items) A&AS Subtotal: Support Installation Total Total Cost (Procurement + Support + Installation) LI 838010 - Comm Elect Mods Air Force - UNCLASSIFIED Page 24 of 40 0.000 P-1 Line #53 0.000 - Volume 1 - 628 === page 665 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 838010 / Comm Elect Mods Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: 2 / Air Traffic Navigation, Integration and Coordination System (ATNAVICS) MDAP/MAIS Code: Modification Item 1 of 1: Obsolescence/DMS Mitigation Kits Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Marlborough, MA Administrative Leadtime (in Months): 3 Dates Production Leadtime (in Months): 5 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Jan 2026 Jan 2027 Jan 2028 Delivery Dates Jun 2026 Jun 2027 Jun 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Contract Field Team Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - 2 / 0.353 - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.353 FY 2027 - / - - / - - / - 2 / 0.353 - / - 2 / 0.353 - / - - / - - / - - / - - / - 2 / 0.353 FY 2028 - / - - / - - / - - / - - / - - / - 2 / 0.390 - / - - / - - / - - / - 2 / 0.390 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - 2 / 0.353 2 / 0.353 - / - 2 / 0.353 2 / 0.390 - / - - / - - / - - / - 6 / 1.096 Installation Cost Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 0 - - - - - 2 - - - 2 - - - 2 - - - - - - - - - - - - - - 0 6 Out 0 - - - - - - - - - - - - - - - - - 0 6 LI 838010 - Comm Elect Mods Air Force - - 2 - - - 2 - - - 2 UNCLASSIFIED Page 25 of 40 P-1 Line #53 Volume 1 - 629 === page 666 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 838010 / Comm Elect Mods Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 ID Code (A=Service Ready, B=Not Service Ready) : A Resource Summary Modification Number / Title: 1 / ATCALS Low Cost Mods (PE 0305114F) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 1.801 2.068 2.396 0.000 2.396 2.204 2.247 2.289 2.335 - 15.340 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 1.801 2.068 2.396 0.000 2.396 2.204 2.247 2.289 2.335 - 15.340 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 1.801 2.068 2.396 0.000 2.396 2.204 2.247 2.289 2.335 - 15.340 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: DESCRIPTION: Fixed base and deployable Air Traffic Control and Landing System (ATCALS) low cost modifications are initiated to resolve diminishing manufacturing source (DMS) issues and minor system deficiencies/ improvements identified through the ATCALS Weapon System Review-Executive Council (WSR-EC), policy TO 00-35D-54 Deficiency Reports, and Material Improvement initiatives. The implementation of these low-cost modifications decreases maintenance costs and improves system operational availability. The return on investment for these low-cost modifications will be realized immediately through decreased unscheduled depot and field level maintenance, enhanced performance, and operational safety. The operational availability of terminal navigational aids, national airspace systems, and precision approach and landing systems are at risk if low-dollar modifications are not provided to reverse unfavorable operational availability metrics. JUSTIFICATION: FY 2027 funds continue ATCALS low cost modifications, to include installation and program support, as prioritized by the program office and the Weapon System Review Executive Committee. Milestone/Development Status No development required. Low cost modifications are based on commercial off-the-shelf technology. Efforts generally include a first article for kit proofing. Secondary Distribution AF Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 838010 - Comm Elect Mods Air Force FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 1.801 2.068 2.396 - 2.396 2.204 2.247 2.289 2.335 - - - - - - - - - 1.801 2.068 2.396 0.000 2.396 2.204 2.247 2.289 2.335 UNCLASSIFIED Page 26 of 40 P-1 Line #53 Volume 1 - 630 === page 667 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 838010 / Comm Elect Mods Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 ID Code (A=Service Ready, B=Not Service Ready) : A MDAP/MAIS Code: Models of Systems Affected: ATCALS Modification Type: Reliability & Maintainability Prior Years Financial Plan Modification Number / Title: 1 / ATCALS Low Cost Mods (PE 0305114F) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: ATCALS Low Cost Mods B Kits Recurring ATCALS Low Cost Mods:EQUIPMENT Group B (Active) - / - 1 / 2.203 - / - 1 / 2.113 - / - - / - - / 1.617 - / 1.896 - / 2.203 - / - - / 2.203 - / 2.008 - / 2.043 - / 2.076 - / 2.113 - / - - / 13.956 - / - - / 1.617 - / 1.896 - / 2.203 - / - - / 2.203 - / 2.008 - / 2.043 - / 2.076 - / 2.113 - / - - / 13.956 - / - - / 1.617 - / 1.896 - / 2.203 - / - - / 2.203 - / 2.008 - / 2.043 - / 2.076 - / 2.113 - / - - / 13.956 - / - - / 0.115 - / 0.103 - / 0.124 - / - - / 0.124 - / 0.127 - / 0.135 - / 0.143 - / 0.148 - / - - / 0.895 - / - - / 0.115 - / 0.103 - / 0.124 - / - - / 0.124 - / 0.127 - / 0.135 - / 0.143 - / 0.148 - / - - / 0.895 Modification Item 1 of 1: ATCALS Low Cost Mods - / - 1 / 0.069 1 / 0.069 1 / 0.069 - / - 1 / 0.069 1 / 0.069 1 / 0.069 1 / 0.070 1 / 0.074 - / - 7 / 0.489 Subtotal: Installation - / - 1 / 0.069 1 / 0.069 1 / 0.069 - / - 1 / 0.069 1 / 0.069 1 / 0.069 1 / 0.070 1 / 0.074 - / - 7 / 0.489 - 1.801 2.068 2.396 0.000 2.396 2.204 2.247 2.289 2.335 - 15.340 Subtotal: Recurring Subtotal: ATCALS Low Cost Mods Subtotal: Procurement, All Modification Items 1 / 1.617 1 / 1.896 1 / 2.203 1 / 2.008 1 / 2.043 1 / 2.076 7 / 13.956 Support (All Modification Items) PSC - Other Gov't Costs Subtotal: Support Installation Total Total Cost (Procurement + Support + Installation) LI 838010 - Comm Elect Mods Air Force UNCLASSIFIED Page 27 of 40 P-1 Line #53 Volume 1 - 631 === page 668 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 838010 / Comm Elect Mods Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: 1 / ATCALS Low Cost Mods (PE 0305114F) MDAP/MAIS Code: Modification Item 1 of 1: ATCALS Low Cost Mods Manufacturer Information Manufacturer Name: Various Manufacturer Location: Tinker AFB Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 6 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jul 2025 Jul 2026 Jul 2027 Jul 2028 Jul 2029 Jul 2030 Jul 2031 Installation Information Method of Implementation: Contract Field Team Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - 1 / 0.069 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.069 FY 2026 - / - - / - 1 / 0.069 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.069 FY 2027 - / - - / - - / - 1 / 0.069 - / - 1 / 0.069 - / - - / - - / - - / - - / - 1 / 0.069 FY 2028 - / - - / - - / - - / - - / - - / - 1 / 0.069 - / - - / - - / - - / - 1 / 0.069 FY 2029 - / - - / - - / - - / - - / - - / - - / - 1 / 0.069 - / - - / - - / - 1 / 0.069 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.070 - / - - / - 1 / 0.070 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.074 - / - 1 / 0.074 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - 1 / 0.069 1 / 0.069 - / - 1 / 0.069 1 / 0.074 - / - 7 / 0.489 1 / 0.069 1 / 0.069 1 / 0.069 1 / 0.070 / - / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 0 - - 1 - - - 1 - - 0 1 - - 0 1 - - 0 1 - - - 1 - - - 1 - 0 7 Out 0 - - 1 - - - 1 - - 0 1 - - 0 1 - - 0 1 - - - 1 - - - 1 - 0 7 LI 838010 - Comm Elect Mods Air Force UNCLASSIFIED Page 28 of 40 P-1 Line #53 Volume 1 - 632 === page 669 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 838010 / Comm Elect Mods Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 ID Code (A=Service Ready, B=Not Service Ready) : A Resource Summary Modification Number / Title: 1 / NAS Low Cost Mods MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 1.763 2.031 2.348 0.000 2.348 2.161 2.203 2.245 2.290 - 15.041 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 1.763 2.031 2.348 0.000 2.348 2.161 2.203 2.245 2.290 - 15.041 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 1.763 2.031 2.348 0.000 2.348 2.161 2.203 2.245 2.290 - 15.041 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: DESCRIPTION: The National Airspace System (NAS) system configuration is centrally maintained and certified by the Federal Aviation Administration (FAA) which has system engineering responsibility for the NAS. NAS low cost modifications are initiated to resolve diminishing manufacturing source issues and system deficiencies/improvements identified through the NAS program office and Weapon System Review-Executive Council (WSR-EC), policy TO 00-35D-54 Deficiency Reports, and Material Improvement initiatives. Supporting activities include, but are not limited to annual low cost modification for planned and unforeseen sustainment activities, obsolescence scans, DMS/Material Shortage studies/resolution, Technical Support Services (TSS) which includes Engineering Support, Site Specific Issue Resolution, Trouble Reports, Investigation Requests, and the Product Support Library. JUSTIFICATION: FY 2027 funds continue NAS low cost modifications, to include installation and program support, as prioritized by the program office and the WSR-EC. Milestone/Development Status No development required. Low cost modifications are based on commercial off-the-shelf technology. Efforts generally include a first article for kit proofing. Secondary Distribution AF Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 838010 - Comm Elect Mods Air Force FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 1.763 2.031 2.348 - 2.348 2.161 2.203 2.245 2.290 - - - - - - - - - 1.763 2.031 2.348 0.000 2.348 2.161 2.203 2.245 2.290 UNCLASSIFIED Page 29 of 40 P-1 Line #53 Volume 1 - 633 === page 670 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 838010 / Comm Elect Mods Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 ID Code (A=Service Ready, B=Not Service Ready) : A MDAP/MAIS Code: Models of Systems Affected: NAS Related RDT&E PEs: 0305114F Modification Type: Reliability & Maintainability Prior Years Financial Plan Modification Number / Title: 1 / NAS Low Cost Mods FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: Low Cost Mod Kits B Kits Recurring - / - 1 / 1.936 - / - 1 / 1.849 - / - Subtotal: Recurring Low Cost Mod Kits:EQUIPMENT Group B (Active) - / - - / 1.365 - / 1.630 - / 1.936 - / - - / 1.936 - / 1.744 - / 1.774 - / 1.806 - / 1.849 - / - - / 12.104 Subtotal: Low Cost Mod Kits - / - - / 1.365 - / 1.630 - / 1.936 - / - - / 1.936 - / 1.744 - / 1.774 - / 1.806 - / 1.849 - / - - / 12.104 - / - - / 1.365 - / 1.630 - / 1.936 - / - - / 1.936 - / 1.744 - / 1.774 - / 1.806 - / 1.849 - / - - / 12.104 - / - - / 0.194 - / 0.190 - / 0.194 - / - - / 0.194 - / 0.192 - / 0.197 - / 0.200 - / 0.202 - / - - / 1.369 - / - - / 0.194 - / 0.190 - / 0.194 - / - - / 0.194 - / 0.192 - / 0.197 - / 0.200 - / 0.202 - / - - / 1.369 Modification Item 1 of 1: Low Cost Mod Kits - / - 1 / 0.204 1 / 0.211 1 / 0.218 - / - 1 / 0.218 1 / 0.225 1 / 0.232 1 / 0.239 1 / 0.239 - / - 7 / 1.568 Subtotal: Installation - / - 1 / 0.204 1 / 0.211 1 / 0.218 - / - 1 / 0.218 1 / 0.225 1 / 0.232 1 / 0.239 1 / 0.239 - / - 7 / 1.568 - 1.763 2.031 2.348 0.000 2.348 2.161 2.203 2.245 2.290 - 15.041 Subtotal: Procurement, All Modification Items 1 / 1.365 1 / 1.630 1 / 1.936 1 / 1.744 1 / 1.774 1 / 1.806 7 / 12.104 Support (All Modification Items) PMA - Other Gov't Costs Subtotal: Support Installation Total Total Cost (Procurement + Support + Installation) LI 838010 - Comm Elect Mods Air Force UNCLASSIFIED Page 30 of 40 P-1 Line #53 Volume 1 - 634 === page 671 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 838010 / Comm Elect Mods Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: 1 / NAS Low Cost Mods MDAP/MAIS Code: Modification Item 1 of 1: Low Cost Mod Kits Manufacturer Information Manufacturer Name: Various Manufacturer Location: Tinker AFB, OK Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 6 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2025 Jan 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jul 2025 Jul 2026 Jul 2027 Jul 2028 Jul 2029 Jul 2030 Jul 2031 Installation Information Method of Implementation: Contract Field Team Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - 1 / 0.204 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.204 FY 2026 - / - - / - 1 / 0.211 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.211 FY 2027 - / - - / - - / - 1 / 0.218 - / - 1 / 0.218 - / - - / - - / - - / - - / - 1 / 0.218 FY 2028 - / - - / - - / - - / - - / - - / - 1 / 0.225 - / - - / - - / - - / - 1 / 0.225 FY 2029 - / - - / - - / - - / - - / - - / - - / - 1 / 0.232 - / - - / - - / - 1 / 0.232 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.239 - / - - / - 1 / 0.239 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 0.239 - / - 1 / 0.239 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Total - / - 1 / 0.204 1 / 0.218 - / - 1 / 0.218 1 / 0.239 - / - 7 / 1.568 1 / 0.211 1 / 0.225 1 / 0.232 1 / 0.239 / - / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 0 - - - 1 - - - 1 - - - 1 - - - 1 - - - 1 - - - 1 - - - 1 0 7 Out 0 - - - 1 - - - 1 - - - 1 - - - 1 - - - 1 - - - 1 - - - 1 0 7 LI 838010 - Comm Elect Mods Air Force UNCLASSIFIED Page 31 of 40 P-1 Line #53 Volume 1 - 635 === page 672 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 P-1 Line Item Number / Title: 838010 / Comm Elect Mods ID Code (A=Service Ready, B=Not Service Ready) : A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 3 / National Airspace System (NAS) Modifications (Reliability & Maintainability) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 0.000 42.404 43.730 45.579 0.000 45.579 30.950 15.962 16.245 16.570 - - - - - - - - - - - - 0.000 42.404 43.730 45.579 0.000 45.579 30.950 15.962 16.245 16.570 - - - - - - - - - - - - 0.000 42.404 43.730 45.579 0.000 45.579 30.950 15.962 16.245 16.570 - Total 211.440 211.440 211.440 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: DESCRIPTION National Airspace System (NAS) Com Elec Mods PE 35137F The NAS program is a Joint Department of War (DoW)/Federal Aviation Administration (FAA) program which entered the operations and support (O&S) phase in 2017. The FAA is the overall lead for the NAS program and the Air Force is the lead for the DoW. Full rate production deliveries began in 2005, and the last planned delivery / install was completed in FY 2018. Program focus is now on mitigation of Diminishing Manufacturing Source (DMS) and material shortage (MS) issues and implementation of system upgrades required to maintain standard configuration across the DoW and FAA. This allows the DoW to maintain a common baseline with the FAA and save support costs for a separate DoW baseline. NAS systems include the Digital Airport Surveillance Radar (DASR), the DoW Advanced Automation System (DAAS) also known as the Standard Terminal Automation Replacement System (STARS), and the Automatic Protocol Exchanger (APEX) required to interface STARS with host-nation ATC systems in Japan, and Korea. JUSTIFICATION: FY 2027 funds continue the lifecycle modification program for DASR, STARS, and APEX (including hardware, installation, and program support costs) through FY 2031. FY 2027 funds procure/fund: DASR - 12 Mark3 (Mk3 Mono-pulse Secondary Surveillance Radar (MSSR) Kits (12 AD/0 ANG/0 AFR) and program support costs. STARS - 10 STARS sustainment kits (7 AD/2 ANG/1 AFR) and program support costs. APEX - 2 Host-Nation Protocol Exchange Kits (2 AD/0 ANG/0 AFR), installation, and program support costs. Milestone/Development Status System in sustainment phase. LI 838010 - Comm Elect Mods Air Force UNCLASSIFIED Page 32 of 40 P-1 Line #53 Volume 1 - 636 === page 673 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 P-1 Line Item Number / Title: 838010 / Comm Elect Mods ID Code (A=Service Ready, B=Not Service Ready) : A Secondary Distribution AF Quantity Total Obligation Authority AFNG Quantity Total: Secondary Distribution MDAP/MAIS Code: FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 40.874 33.055 39.339 - 39.339 26.790 15.962 16.245 16.570 - - - - - - - - - 1.530 4.160 4.160 - 4.160 2.080 - - - Quantity - - - - - - - - - Total Obligation Authority - 6.515 2.080 - 2.080 2.080 - - - Quantity - - - - - - - - - 42.404 43.730 45.579 0.000 45.579 30.950 15.962 16.245 16.570 Total Obligation Authority AFR Modification Number / Title: 3 / National Airspace System (NAS) Modifications (Reliability & Maintainability) Total Obligation Authority LI 838010 - Comm Elect Mods Air Force UNCLASSIFIED Page 33 of 40 P-1 Line #53 Volume 1 - 637 === page 674 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 838010 / Comm Elect Mods Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 ID Code (A=Service Ready, B=Not Service Ready) : A MDAP/MAIS Code: Models of Systems Affected: NAS Modification Type: Reliability & Maintainability Prior Years Financial Plan Modification Number / Title: 3 / National Airspace System (NAS) Modifications (Reliability & Maintainability) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 5: Automatic Protocol Exchanger (APEX) B Kits Recurring Automatic Protocol Exchanger (APEX):EQUIPMENT Group B (Active) - / - - / - - / 2.479 - / 2.480 - / - - / 2.479 - / 2.480 DASR Mark2 MSSR Mod Kits:EQUIPMENT Group B (Active) - / - 1 / 0.825 3 / 2.475 DASR Mark2 MSSR Mod Kits:EQUIPMENT Group B (Reserve) - / - - - / - - / 0.825 - / - - / 0.825 DASR RF Amplifier and Driver Sustainment:EQUIPMENT Group B (Active) - / - 6 / 4.590 DASR RF Amplifier and Driver Sustainment:EQUIPMENT Group B (Guard) - / - 2 / 1.530 - DASR RF Amplifier and Driver Sustainment:EQUIPMENT Group B (Reserve) - / - - - / - - / 6.120 - / - - / 6.120 Subtotal: Recurring Subtotal: Automatic Protocol Exchanger (APEX) 2 / 2.479 2 / 2.480 2 / 2.480 - / - 2 / 2.480 - / - - / - - / - - / - - / - - / 2.480 - / - - / 2.480 - / - - / - - / - 1 / 0.825 - / - - - / 3.300 - / - - / 3.300 - / - 10 / 7.650 - / - 6 / 7.439 - / 2.480 - / - - / - - / - - / - - / - - / 7.439 - / 2.480 - / - - / - - / - - / - - / - - / 7.439 - / - - / - - / - - / - - / - - / - 4 / 3.300 / - - / - - / - - / - - / - - / - - / - 1 / 0.825 - / - - / - - / - - / - - / - - / - - / - - / 4.125 - / - - / - - / - - / - - / - - / - - / - - / 4.125 / - - / - - / - - / - - / - - / - - / - - / - 16 / 12.240 - / - - / - - / - - / - - / - - / - - / - - / - 2 / 1.530 2 / 1.530 - / - - / - - / - - / - - / - - / - - / - - / - 2 / 1.530 - / 9.180 - / - - / - - / - - / - - / - - / - - / - - / - - / 15.300 - / 9.180 - / - - / - - / - - / - - / - - / - - / - - / - - / 15.300 Modification Item 2 of 5: DASR Mark2 MSSR Mod Kits B Kits Recurring Subtotal: Recurring Subtotal: DASR Mark2 MSSR Mod Kits / - Modification Item 3 of 5: DASR RF Amplifier and Driver Sustainment B Kits Recurring Subtotal: Recurring Subtotal: DASR RF Amplifier and Driver Sustainment / - Modification Item 4 of 5: Group B: Mk3 MSSR Kits LI 838010 - Comm Elect Mods Air Force UNCLASSIFIED Page 34 of 40 P-1 Line #53 Volume 1 - 638 === page 675 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 838010 / Comm Elect Mods Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 ID Code (A=Service Ready, B=Not Service Ready) : A MDAP/MAIS Code: Models of Systems Affected: NAS Modification Type: Reliability & Maintainability Prior Years Financial Plan Modification Number / Title: 3 / National Airspace System (NAS) Modifications (Reliability & Maintainability) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) B Kits Recurring Group B: Mk3 MSSR Kits:EQUIPMENT Group B (Active) - / - - / - - / - 12 / 20.880 - / - 12 / 20.880 - / - - / - - / - - / 20.880 - / - - / 20.880 - / 12.460 - / 7.280 - / 12.760 - / - - / - - / - - / 20.880 - / - - / 20.880 - / 12.460 - / 7.280 - / 12.760 STARS Sustainment Kits:EQUIPMENT Group B (Active) - / - 9 / 18.720 7 / 14.060 - / - 7 / 14.060 6 / 12.480 3 / 6.240 STARS Sustainment Kits:EQUIPMENT Group B (Guard) - / - - / - 2 / 4.160 2 / 4.160 - / - 2 / 4.160 1 / 2.080 - / - STARS Sustainment Kits:EQUIPMENT Group B (Reserve) - / - - / - 2 / 4.160 1 / 2.080 - / - 1 / 2.080 1 / 2.080 - / - - / - - / 31.200 - / 27.040 - / 20.300 - / - - / 20.300 - / 16.640 - / 6.240 - / 2.120 - / - - / 31.200 - / 27.040 - / 20.300 - / - - / 20.300 - / 16.640 - / 6.240 - / 2.120 - / - - / 40.624 - / 42.000 - / 43.660 - / - - / 43.660 - / 29.100 - / - - / 1.285 - / 1.083 - / 1.454 - / - - / 1.454 - / 1.850 - / 2.442 - / 1.365 - / - - / 1.285 - / 1.083 - / 1.454 - / - - / 1.454 - / 1.850 - / 2.442 - / 1.365 Modification Item 1 of 5: Automatic Protocol Exchanger (APEX) - / - 2 / 0.495 2 / 0.647 2 / 0.465 - / - 2 / 0.465 - / - - / - - / - Subtotal: Installation - / - 2 / 0.495 2 / 0.647 2 / 0.465 - / - 2 / 0.465 - / - - / - - / - 0.000 42.404 43.730 45.579 0.000 45.579 Subtotal: Recurring Subtotal: Group B: Mk3 MSSR Kits 7 / 12.460 4 / 7.280 7 / 12.760 4 / 7.600 - / - 34 / 60.980 - / 7.600 - / - - / 60.980 - / 7.600 - / - - / 60.980 1 / 2.120 3 / 6.480 - / - 44 / 91.300 - / - - / - - / - 5 / 10.400 - / - - / - - / - 4 / 8.320 - / 6.480 - / - - - / 6.480 - / - - / 110.020 / 14.080 - / - - / 197.864 - / 2.490 - / - - / 11.969 - / 2.490 - / - - / 11.969 - / - - / - 6 / 1.607 - / - - / - 6 / 1.607 - 211.440 Modification Item 5 of 5: STARS Sustainment Kits B Kits Recurring Subtotal: Recurring Subtotal: STARS Sustainment Kits Subtotal: Procurement, All Modification Items 15 / 31.200 / 13.520 - / 14.880 - - / 110.020 Support (All Modification Items) PMA - Other Gov't Costs Subtotal: Support Installation Total Total Cost (Procurement + Support + Installation) LI 838010 - Comm Elect Mods Air Force UNCLASSIFIED Page 35 of 40 30.950 15.962 P-1 Line #53 16.245 16.570 Volume 1 - 639 === page 676 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 838010 / Comm Elect Mods Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: 3 / National Airspace System (NAS) Modifications (Reliability & Maintainability) MDAP/MAIS Code: Modification Item 1 of 5: Automatic Protocol Exchanger (APEX) Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Marlborough, MA Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 3 Dates FY 2025 FY 2026 FY 2027 Contract Dates Jan 2025 Mar 2026 Mar 2027 FY 2028 Delivery Dates Apr 2025 Jun 2026 Jun 2027 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Contract Field Team Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - FY 2025 - / - 2 / 0.495 - / - - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.495 FY 2026 - / - - / - 2 / 0.647 - / - - / - - / - - / - - / - - / - - / - - / - 2 / 0.647 FY 2027 - / - - / - - / - 2 / 0.465 - / - 2 / 0.465 - / - - / - - / - - / - - / - 2 / 0.465 FY 2028 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - 2 / 0.495 2 / 0.465 - / - 2 / 0.465 - / - - / - - / - - / - - / - 6 / 1.607 2 / 0.647 / - Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 0 - 2 - - - 2 - - - 2 - - - - - - - - - - - - - - - - - - 0 6 Out 0 - - - - - - - - - - - - - - - - - 0 6 - - LI 838010 - Comm Elect Mods Air Force 2 - - - 2 - - - 2 UNCLASSIFIED Page 36 of 40 P-1 Line #53 Volume 1 - 640 === page 677 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 P-1 Line Item Number / Title: 838010 / Comm Elect Mods ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: 3 / National Airspace System (NAS) Modifications (Reliability & Maintainability) MDAP/MAIS Code: Modification Item 2 of 5: DASR Mark2 MSSR Mod Kits Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Marlborough, MA Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 Contract Dates Jan 2025 Jan 2026 Delivery Dates Jan 2026 Jan 2027 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation (Organic): Org/Intermediate LI 838010 - Comm Elect Mods Air Force Installation Quantity: 5 UNCLASSIFIED Page 37 of 40 P-1 Line #53 Volume 1 - 641 === page 678 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 P-1 Line Item Number / Title: 838010 / Comm Elect Mods ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: 3 / National Airspace System (NAS) Modifications (Reliability & Maintainability) MDAP/MAIS Code: Modification Item 3 of 5: DASR RF Amplifier and Driver Sustainment Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Marlborough, MA Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 Contract Dates Jan 2025 Jan 2026 Delivery Dates Jan 2026 Jan 2027 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation (Organic): Org/Intermediate LI 838010 - Comm Elect Mods Air Force Installation Quantity: 20 UNCLASSIFIED Page 38 of 40 P-1 Line #53 Volume 1 - 642 === page 679 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 P-1 Line Item Number / Title: 838010 / Comm Elect Mods ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: 3 / National Airspace System (NAS) Modifications (Reliability & Maintainability) MDAP/MAIS Code: Modification Item 4 of 5: Group B: Mk3 MSSR Kits Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Marlborough, MA Administrative Leadtime (in Months): 2 Dates FY 2025 Production Leadtime (in Months): 18 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Jul 2028 Jul 2029 Jul 2030 Jul 2031 Jul 2032 Installation Information Method of Implementation (Organic): Org/Intermediate LI 838010 - Comm Elect Mods Air Force Installation Quantity: 34 UNCLASSIFIED Page 39 of 40 P-1 Line #53 Volume 1 - 643 === page 680 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 03 / 8 P-1 Line Item Number / Title: 838010 / Comm Elect Mods ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: 3 / National Airspace System (NAS) Modifications (Reliability & Maintainability) MDAP/MAIS Code: Modification Item 5 of 5: STARS Sustainment Kits Manufacturer Information Manufacturer Name: Raytheon Manufacturer Location: Marlborough, MA Administrative Leadtime (in Months): 3 Production Leadtime (in Months): 12 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Aug 2025 Apr 2026 Jan 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Delivery Dates Aug 2026 Apr 2027 Jan 2028 Jan 2029 Jan 2030 Jan 2031 Jan 2032 Installation Information Method of Implementation (Organic): Org/Intermediate LI 838010 - Comm Elect Mods Air Force Installation Quantity: 53 UNCLASSIFIED Page 40 of 40 P-1 Line #53 Volume 1 - 644 === page 681 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 842990 / Personal Safety and Rescue Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 2: Personal Safety & Rescue Equip ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0207227F, 0604706F Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) - Gross/Weapon System Cost ($ in Millions) - Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) - Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) - FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 81.782 87.994 - 87.994 91.121 - - - - - 81.782 87.994 - 87.994 91.121 - - - - - 81.782 87.994 - 87.994 91.121 109.595 109.595 109.595 101.789 101.789 101.789 103.479 103.479 103.479 To FY 2031 Complete 105.546 105.546 105.546 Total - 681.306 - 681.306 - 681.306 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: This program provides a wide variety of base support and safety of flight items for warfighters with worldwide application that enhance warfighter performance, protection, and survivability. Guardian Angel: Guardian Angel is a family of systems (FoS) formulated to execute Air Force Combat Search and Rescue and Personnel Recovery operations. GA FoS is employed by three distinct Air Force Specialties: Pararescue men (PJ), Survival, Evasion, Resistance, and Escape (SERE) and Combat Rescue Officer (CRO). GA equipment is comprised of nine critical mission areas: Precision Aerial Insertion, Information Management, Maritime Rescue, Ground Mobility, Technical Recovery, Medical, Visual Augmentation (Night Vision/ Augmented Reality), and SERE. To stay aligned with DOW Focus Areas (C2 & Logistics mobility), funds will be used to obtain significant improvements in operational capability. Representative items include but are not limited to cargo & personnel parachute equipment, technical recovery equipment (items to perform rescue/recovery of personnel or sensitive items), information management systems (communication), software licenses, night vision and enhancement accessories, ground transportation, extended maritime open ocean boat & smaller boats for littoral, and training simulators (cognitive medical training, emergency parachute procedures, etc.) to supplement, augment, and optimize current training events, independent of aircraft availability. Procurement is required to meet mission needs through initial procurement or technical refresh for the next generation assets for GA dismounted operators. Items procured during execution may change based on critical equipment needed to support current Air Force mission requirements. This includes applicable training, spares, and repairs. This funding request will also support potential Diminishing Manufacturer Source (DMS) and obsolescence solutions, to include if optimal, life of type buys or bridge buys limited to the program of record quantity. Guardian Angel Air-Deployable Rescue Vehicle: Funding for GA FoS is in Program Element 0207227F. Items requested in FY2027 as identified on the P-5 Exhibit are representative but not limited to the items to be procured. Items procured during execution may change based on critical equipment needed to support current Air Force mission requirements. Due to the rapidly changing threat environment, the acquisition program manager has the authority to redirect funding as necessary to meet current slated and emerging requirements for operational units. Special Tactics: The Special Warfare Acquisition Growth and Refresh (SWAGR) program funds Air Force standardized equipment for Special Tactics combat controllers, pararescue personnel, Special Reconnaissance operators, and Tactical Air Control Party (TACP) to perform their Air Force Special Operations Command (AFSOC) missions. Representative items include but are not limited to training and simulators, aerial insertion, technical recovery, maritime rescue equipment, ground transportation and vehicular support equipment. Items requested in FY27 as identified on the P-5 Exhibit are representative but not limited to the items to be procured. Items procured during execution may change based on critical equipment needed to support current Air Force mission requirements. Due to the rapidly changing threat environment, the acquisition program manager has the authority to redirect funding as necessary to meet current slated and emerging requirements for operational units. This includes applicable training, spares, and repairs to LI 842990 - Personal Safety and Rescue Equipment Air Force UNCLASSIFIED Page 1 of 18 P-1 Line #54 Volume 1 - 645 === page 682 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 2: Personal Safety & Rescue Equip ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 842990 / Personal Safety and Rescue Equipment Program Elements for Code B Items: N/A Other Related Program Elements: 0207227F, 0604706F Line Item MDAP/MAIS Code: N/A manage, execute, and deliver Special Tactics weapon system capability. This funding request will support potential DMS and obsolescence solutions, to include if optimal, life of type buys or bridge buys limited to the program of record quantity. Funding for this effort is in program element 0408011F. Items requested in FY2027 as identified on the P-5 Exhibit are representative but not limited to the items to be procured. Items procured during execution may change based on critical equipment needed to support current Air Force mission requirements. Due to the rapidly changing threat environment, the acquisition program manager has the authority to redirect funding as necessary to meet current slated and emerging requirements for operational units. Items Less than $5M (Human Systems Program Office) This program procures aircrew flight equipment and other combat support equipment. Representative items include flight helmets and visors, oxygen breathing equipment, flame resistant/retardant and blast/ ballistic protective gear, laser eye protection, personnel locator beacons, nuclear flash blindness devices, personnel parachutes, ejection seats/equipment, post-ejection survival systems, night vision goggles, survival radios, associated test sets, life rafts, life preservers, anti-exposure coveralls, aircrew flight ensembles, physiological monitoring devices, test sets & Time Compliance Technical Order (TCTO) Kits and other air/ground crew equipment. Items procured during execution may change based on critical equipment needed to support current Air Force mission requirements. Next-Generation Fixed Wing Helmet (NGFWH) provides performance and sustainability upgrades to the current HGU-55P helmet, used by all USAF fixed-wing platforms other than the F-35. Current helmets are outdated and not optimized to be used in parallel with current helmet mounted display systems, which provide the warfighter day and night-time vision and cueing capabilities. NGFWH primary goals are to provide a helmet upgrade that will provide a more stable, balanced helmet, while still being compatible with current equipment used on the legacy helmet. In addition, the NGFWH will also provide improved noise and impact protection, endurance, all while decreasing the logistical footprint to maintain/sustain the helmet. Next Generation Ejection Seat (NGES) This effort includes the procurement, fielding, and installation of an upgraded ejection seat escape system for ACES II-equipped aircraft. The Next Generation Ejection Seat (NGES) safely accommodates greater variation in aircrew minimum/maximum weights, a minimum aircrew sitting height of 31 inches, the use of Helmet Mounted Displays, and delivers seat modularity to decreases maintenance costs. It reduces the risk of injuries to the arms and legs (especially limb flail), neck, and spinal column throughout the entire ejection event. Ground and Aircrew Night Vision Goggles (NVG) and Binocular Night Vision Devices (BNVD) with associated test sets and calibration kits. These types of NVGs include the monocular night vision device, which is a handheld, head-mounted, helmet-mounted, or weapon-mounted night vision system that enables walking, weapon firing, short-range surveillance, map reading, vehicle maintenance, and first-aid administration during moonlight and starlight conditions. Enterprise Select Class II funds Organizational Clothing and Individual Equipment procurement for deploying Airmen and Guardians. Funds procure new equipment to fill new deployment requirements, assess industry base readiness, and supplier quality assurances. Funds qualifying other Service's solutions, commercial-off-the-shelf (COTS) products for Department of the Airforce Organizational Clothing and Individual Equipment (OCIE) requirements. Previous successful efforts may evolve into enduring capabilities as other users and MAJCOMs seek to incorporate these assets into their operations and inventory and include Modular Scalable Vest (MSV), Female Body Armor, Vital Torso Protection, protective toe cold weather combat boots, cold/extreme cold weather headwear, and cold/extreme cold weather handwear. Funds may be used to address associated emerging ground crew requirements, and for program management activities. Funding for this effort is in program element 071200F. In direct support of Secretary of War direction to increase readiness across the DoW, efforts within this program element will be prioritized based on the National Defense Authorization Act (NDAA), USAF Force Design, Agile Combat Employment (ACE), and the Defense Planning Guide (DPG). These efforts will support work and collaboration efforts across the Combat Readiness Directorate in PE's 780651F, 71212F, 72833F, 64706F, 65827F, 22834F, 52834F, 28031F, 41135F and 27521F to increase readiness across the Air Force Enterprise Funding for this exhibit contained in PEs 0207227F, 0207433F, 0408011F, 0503113F, 0701200F and 0702833F. Projected allocations for component requirements are subject to total force demands and priorities. Funds may be used to address associated program management activities, emerging requirements, and short notice Diminishing Manufacturing Sources and Material Shortage (DMSMS) issues. LI 842990 - Personal Safety and Rescue Equipment Air Force UNCLASSIFIED Page 2 of 18 P-1 Line #54 Volume 1 - 646 === page 683 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 842990 / Personal Safety and Rescue Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 2: Personal Safety & Rescue Equip ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0207227F, 0604706F Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-5 Guardian Angel P-5a, P-21 A - / - - / 25.874 - / 24.434 - / 28.394 - / - - / 28.394 P-5 Items Less Than $5 Million P-5a, P-21 A - / - - / 78.663 - / 52.763 - / 55.904 - / - - / 55.904 P-5 Special Tactics/Combat Control Equipment A - / - - / 5.058 - / 4.585 - / 3.696 - / - - / 3.696 P-40 Total Gross/Weapon System Cost - / - / 109.595 - / 81.782 - / 87.994 - / - - / 87.994 - *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Guardian Angel funding procures these types of equipment: Technical and Personnel Rescue/Recovery including Maritime, Command & Control, Aerial Insertion, Vehicular, Locator of Personnel, SONAR, Mission Planning, Information Management Systems and Mobile Intercom System. FY 2027 Special Tactics/Combat Control Equipment funding procures these types of equipment: Aerial Insertion, Maritime Rescue, Technical and Personal Rescue/Recovery, and Ground Mobility systems. FY 2027 Items Less Than 5 Million increased in order to procure Next Generation Ejection Seats. Funding procures these types of equipment: Aircrew Laser Eye Protection Equipment, Night Vision Goggles, Aircrew Flight Equipment Testers, Parachutes, and Next Generation Ejection Seats. Items Less Than 5 Million also includes Enterprise Select Class II new equipment procurement funds Department of the Air Force deployers including Extreme Cold Weather Boots, Arctic Equipment, low signature infrared equipment, conformal body armor, rifle rated helmets, and other Organizational Clothing and Individual Equipment driven by Combatant Command Theater requirements. Items requested in FY2027 as identified on the P-5 Exhibit are representative but not limited to the items to be procured. Items procured during execution may change based on critical equipment needed to support current Air Force mission requirements. Due to the rapidly changing threat environment, the acquisition program manager has the authority to redirect funding as necessary to meet current slated and emerging requirements for operational units. LI 842990 - Personal Safety and Rescue Equipment Air Force UNCLASSIFIED Page 3 of 18 P-1 Line #54 Volume 1 - 647 === page 684 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 842990 / Personal Safety and Rescue Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Guardian Angel MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 25.874 24.434 28.394 - 28.394 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 25.874 24.434 28.394 - 28.394 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 25.874 24.434 28.394 - 28.394 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Guardian Angel Cost Recurring Cost Aerial Insertion Equipment - - - 0.015 227 3.405 0.015 160 2.400 0.015 185 2.775 - - - 0.015 185 2.775 Technical Recovery Equipment - - - 0.079 17 1.343 0.079 13 1.027 0.079 18 1.422 - - - 0.079 18 1.422 Medical Equipment - - - 0.020 3 0.060 0.020 1 0.020 0.020 1 0.020 - - - 0.020 1 0.020 Maritime Rescue Equipment - - - 0.026 129 3.354 0.026 71 1.846 0.026 139 3.614 - - - 0.026 139 3.614 - - - 0.020 737 14.740 0.020 740 14.800 0.020 800 16.000 - - - 0.020 800 16.000 SERE - - - 0.020 1 0.020 0.020 1 0.020 0.020 2 0.040 - - - 0.020 2 0.040 Guardian Angel Enhanced Night Vision Systems - - - 0.018 2 0.036 0.018 1 0.018 0.018 3 0.054 - - - 0.018 3 0.054 PMA Contractor Services - - - 2.886 1 2.886 4.055 1 4.055 4.105 1 4.105 - - - 4.105 1 4.105 Program Support - - - 0.030 1 0.030 0.248 1 0.248 0.364 1 0.364 - - - 0.364 1 Subtotal: Recurring Cost - - - - - 25.874 - - 24.434 - - 28.394 - - - - - 28.394 Subtotal: Hardware Guardian Angel Cost - - - - - 25.874 - - 24.434 - - 28.394 - - - - - 28.394 Gross/Weapon System Cost - - - - - 25.874 - - 24.434 - - 28.394 - - - - - 28.394 Information Management (†) Equipment LI 842990 - Personal Safety and Rescue Equipment Air Force UNCLASSIFIED Page 4 of 18 P-1 Line #54 0.364 Volume 1 - 648 === page 685 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 2 P-1 Line Item Number / Title: 842990 / Personal Safety and Rescue Equipment ID Code (A=Service Ready, B=Not Service Ready) : A (†) Item Number / Title [DODIC]: Guardian Angel MDAP/MAIS Code: indicates the presence of a P-5a LI 842990 - Personal Safety and Rescue Equipment Air Force UNCLASSIFIED Page 5 of 18 P-1 Line #54 Volume 1 - 649 === page 686 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 2 Cost Elements Information Management (†) Equipment Information Management (†) Equipment Information Management (†) Equipment (†) O O C P-1 Line Item Number / Title: 842990 / Personal Safety and Rescue Equipment Item Number / Title [DODIC]: Guardian Angel FY Contractor and Location Method/Type or Funding Vehicle 2025 Multiple / Multiple Various AFLCMC Wright Patterson AFB Jan 2025 Oct 2025 737 0.020 Y Dec 2024 2026 Multiple / Multiple Various AFLCMC Wright Patterson AFB Jan 2026 Oct 2026 740 0.020 Y Dec 2025 2027 Multiple / Multiple Various AFLCMC Wright Patterson AFB Jan 2027 Oct 2027 800 0.020 Y Dec 2026 Location of PCO Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($ M) RFP Issue Date indicates the presence of a P-21 LI 842990 - Personal Safety and Rescue Equipment Air Force UNCLASSIFIED Page 6 of 18 P-1 Line #54 Volume 1 - 650 === page 687 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 842990 / Personal Safety and Rescue Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Guardian Angel Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Information Management Equipment 1 2025 AF 737 0 737 1 2026 AF 740 0 740 1 2027 AF 800 0 800 A - - - - - - - - - 62 62 62 62 A - 62 62 62 62 62 62 62 55 0 - - - - - - - - 740 800 O C T N O V D E C LI 842990 - Personal Safety and Rescue Equipment Air Force J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #54 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 651 === page 688 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 842990 / Personal Safety and Rescue Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Guardian Angel Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Information Management Equipment 1 2025 AF 737 737 0 1 2026 AF 740 0 740 1 2027 AF 800 0 800 0 62 62 62 62 A - O C T N O V D E C LI 842990 - Personal Safety and Rescue Equipment Air Force J A N F E B 62 62 62 62 62 62 60 60 - - - - - - - - M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 18 S E P 0 66 O C T 66 N O V 66 D E C 66 J A N 66 F E B P-1 Line #54 66 M A R 66 A P R 66 M A Y 66 J U N 66 J U L 66 A U G 74 S E P Volume 1 - 652 0 === page 689 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 842990 / Personal Safety and Rescue Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 2 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: Guardian Angel Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Multiple - Multiple MSR For 2027 1-8-5 For 2027 MAX For 2027 1 1 800 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 1 Manufacturing PLT 4 Total After Oct 1 9 13 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 842990 - Personal Safety and Rescue Equipment Air Force UNCLASSIFIED Page 9 of 18 P-1 Line #54 Volume 1 - 653 === page 690 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 842990 / Personal Safety and Rescue Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Items Less Than $5 Million MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 78.663 52.763 55.904 - 55.904 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 78.663 52.763 55.904 - 55.904 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 78.663 52.763 55.904 - 55.904 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Ancillary Equipment - Items Less Than $5 Million Cost Recurring Cost Night Vision Goggles - - - 0.012 1,906 22.874 0.012 358 4.300 0.012 397 4.764 - - - 0.012 397 4.764 Aircrew Laser Eye Protection - - - - - - 0.001 8,500 8.500 0.001 4,000 4.000 - - - 0.001 4,000 4.000 Aircrew Flight Equipment - - - 0.019 380 7.249 - - - 0.009 489 4.400 - - - 0.009 489 4.400 (†) - - - 0.561 12 6.732 0.560 37 20.733 0.519 54 28.039 - - - 0.519 54 28.039 Aircrew Flight Equipment Test - - - 0.078 473 37.094 0.083 84 7.001 0.083 88 7.300 - - - 0.083 88 7.300 Aircrew Female Fitment Equipment - - - 0.043 8 0.347 - - - - - - - - - - - - Enterprise Select Class II - - - - - - - - 1.000 - - 1.007 - - - - - 1.007 Subtotal: Recurring Cost - - - - - 74.296 - - 41.534 - - 49.510 - - - - - 49.510 Next Gen Ejection Seat - - - - - - - - 8.532 - - - - - - - - - Subtotal: Non Recurring Cost - - - - - - - - 8.532 - - - - - - - - - - - - - - 74.296 - - 50.066 - - 49.510 - - - - - 49.510 Next Generation Ejection Seat (†) Equipment Non Recurring Cost Subtotal: Ancillary Equipment - Items Less Than $5 Million Cost LI 842990 - Personal Safety and Rescue Equipment Air Force UNCLASSIFIED Page 10 of 18 P-1 Line #54 Volume 1 - 654 === page 691 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 842990 / Personal Safety and Rescue Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Items Less Than $5 Million MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Support - Items Less Than $5 Million Cost Mission Support Personnel and Travel - - - - - 4.367 - - 2.697 - - 6.394 - - - - - 6.394 Subtotal: Support - Items Less Than $5 Million Cost - - - - - 4.367 - - 2.697 - - 6.394 - - - - - 6.394 Gross/Weapon System Cost - - - - - 78.663 - - 52.763 - - 55.904 - - - - - 55.904 Remarks: Items procured during execution may change based on critical equipment needed to support current Air Force mission requirements. (†) indicates the presence of a P-5a LI 842990 - Personal Safety and Rescue Equipment Air Force UNCLASSIFIED Page 11 of 18 P-1 Line #54 Volume 1 - 655 === page 692 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 2 O O C Cost Elements (†) Next Generation Ejection Seat (†) Next Generation Ejection Seat (†) Next Generation Ejection Seat Aircrew Flight Equipment Test (†) Equipment Aircrew Flight Equipment Test (†) Equipment Aircrew Flight Equipment Test (†) Equipment (†) P-1 Line Item Number / Title: 842990 / Personal Safety and Rescue Equipment Method/Type or Funding Vehicle Location of PCO Item Number / Title [DODIC]: Items Less Than $5 Million Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty RFP Issue Date FY Contractor and Location 2025 Collins Aerospace / Colorado Springs, CO SS / FFP AFLCMC/WN - Agile Combat Systems May 2026 Nov 2027 12 0.561 Y Mar 2025 2026 Collins Aerospace / Colorado Springs, CO SS / FFP AFLCMC/WN - Agile Combat Systems May 2026 Nov 2027 37 0.560 Y Mar 2025 2027 Collins Aerospace / Colorado Springs, CO SS / FFP AFLCMC/WN - Agile Combat Systems May 2027 Nov 2028 54 0.519 Y Sep 2026 2025 Chemring Energetic Devices / Downers Grove, ILL SS / FFP AFLCMC/WN - Agile Combat Systems Aug 2025 Mar 2026 473 0.078 Y May 2023 2026 Chemring Energetic Devices / Downers Grove, ILL SS / FFP AFLCMC/WN - Agile Combat Systems May 2026 Dec 2028 84 0.083 Y May 2023 2027 Chemring Energetic Devices / Downers Grove, ILL SS / FFP AFLCMC/WN - Agile Combat Systems May 2027 Dec 2029 88 0.083 Y May 2023 (Each) indicates the presence of a P-21 Remarks: Items procured during execution may change based on critical equipment needed to support current Air Force mission requirements. LI 842990 - Personal Safety and Rescue Equipment Air Force UNCLASSIFIED Page 12 of 18 P-1 Line #54 Volume 1 - 656 === page 693 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 842990 / Personal Safety and Rescue Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Items Less Than $5 Million Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Next Generation Ejection Seat 1 2025 AF 12 0 12 A - - - - - 12 1 2026 AF 37 0 37 A - - - - - 37 1 2027 AF 54 0 54 54 Aircrew Flight Equipment Test Equipment (1) 2 2025 AF 473 0 473 2 2026 AF 84 0 84 2 2027 AF 88 0 88 A - - - - - - - 75 - - - - - - 398 A - - - - - 84 88 O C T N O V D E C LI 842990 - Personal Safety and Rescue Equipment Air Force J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #54 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 657 === page 694 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 842990 / Personal Safety and Rescue Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Items Less Than $5 Million Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Next Generation Ejection Seat 1 2025 AF 12 0 12 - - - - - - - - - - - - - 12 1 2026 AF 37 0 37 - - - - - - - - - - - - - 37 1 2027 AF 54 0 54 A - - - - - - - 0 0 - - - - - - - - - - 54 Aircrew Flight Equipment Test Equipment (1) 2 2025 AF 473 75 398 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 15 38 2 2026 AF 84 0 84 - - - - - - - - - - - - - - - - - - - - - - - - 84 2 2027 AF 88 0 88 A - - - - - - - - - - - - - - - - - 88 O C T N O V D E C LI 842990 - Personal Safety and Rescue Equipment Air Force J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #54 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 658 === page 695 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 842990 / Personal Safety and Rescue Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Items Less Than $5 Million Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Next Generation Ejection Seat 1 2025 AF 12 12 0 1 2026 AF 37 37 0 1 2027 AF 54 0 54 0 0 - 50 4 0 Aircrew Flight Equipment Test Equipment (1) 2 2025 AF 473 435 38 15 15 8 2 2026 AF 84 0 84 - - 7 2 2027 AF 88 0 88 - - O C T N O V 0 7 D E C LI 842990 - Personal Safety and Rescue Equipment Air Force 7 J A N 7 F E B 7 M A R 7 A P R 7 M A Y 7 J U N 7 J U L 7 A U G UNCLASSIFIED Page 15 of 18 7 S E P 7 O C T 0 N O V 7 D E C 7 J A N 7 F E B P-1 Line #54 7 M A R 7 A P R 7 M A Y 7 J U N 7 J U L 7 A U G 7 18 S E P Volume 1 - 659 === page 696 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 842990 / Personal Safety and Rescue Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Items Less Than $5 Million Fiscal Year 2031 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2030 1 OCT Fiscal Year 2032 Calendar Year 2031 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2032 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Next Generation Ejection Seat 1 2025 AF 12 12 0 0 1 2026 AF 37 37 0 0 1 2027 AF 54 54 0 0 0 Aircrew Flight Equipment Test Equipment (1) 2 2025 AF 473 473 0 2 2026 AF 84 84 0 2 2027 AF 88 70 18 0 7 O C T 7 N O V 4 D E C LI 842990 - Personal Safety and Rescue Equipment Air Force 0 J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 18 S E P O C T N O V D E C J A N F E B P-1 Line #54 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 660 === page 697 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 842990 / Personal Safety and Rescue Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 2 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: Items Less Than $5 Million Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Collins Aerospace - Colorado Springs, CO 1 1 600 0 0 0 0 1 8 18 26 2 Chemring Energetic Devices - Downers Grove, ILL 1 7 180 0 0 0 0 1 8 31 39 Remarks: Aircrew Flight Equipment (AFE) contains varying quantities of Next Generation Fixed Wing Helmet, Night Vision Device Test Equipment, Heated Flight Clothing, Isolated Personnel Survival Aircrew Flight Equipment (IPSAFE), Nuclear Flash Blindness Goggles Modernization & parachutes. Aircrew Laser Eye Protection (ALEP) is composed of varying quantities/product lines including but not limited to ballistic spectacles, visors etc. Aircrew Flight Equipment Test Equipment: The original P-21 monthly delivery schedule was based on a 12-month production timeline. While the vendor's initial production capacity at contract award was not fully established, current projections indicate output will be lower than originally planned. The delivery rate is now expected to peak at approximately 15 units per month. However, the vendor was able to initiate deliveries 12 months earlier than anticipated, albeit at reduced production quantities. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (1) Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. LI 842990 - Personal Safety and Rescue Equipment Air Force UNCLASSIFIED Page 17 of 18 P-1 Line #54 Volume 1 - 661 === page 698 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 842990 / Personal Safety and Rescue Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Special Tactics/Combat Control Equipment MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 5.058 4.585 3.696 - 3.696 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 5.058 4.585 3.696 - 3.696 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 5.058 4.585 3.696 - 3.696 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Special Tactics/Combat Control Equipment Cost Recurring Cost Aerial Insertion Equipment - - - 0.015 77 1.155 0.015 60 0.900 0.015 31 0.465 - - - 0.015 31 0.465 Maritime Rescue Equipment - - - 0.026 108 2.808 0.026 100 2.600 0.026 72 1.872 - - - 0.026 72 1.872 Technical Recovery Equipment - - - 0.079 5 0.395 0.079 6 0.474 0.079 5 0.395 - - - 0.079 5 0.395 Vehicular Equipment - - - 0.296 2 0.592 0.296 2 0.592 0.296 3 0.888 - - - 0.296 3 0.888 Visual Augmentation Capabilities - - - 0.018 6 0.108 0.019 1 0.019 0.019 4 0.076 - - - 0.019 4 0.076 Subtotal: Recurring Cost - - - - - 5.058 - - 4.585 - - 3.696 - - - - - 3.696 Subtotal: Hardware - Special Tactics/Combat Control Equipment Cost - - - - - 5.058 - - 4.585 - - 3.696 - - - - - 3.696 Gross/Weapon System Cost - - - - - 5.058 - - 4.585 - - 3.696 - - - - - 3.696 LI 842990 - Personal Safety and Rescue Equipment Air Force UNCLASSIFIED Page 18 of 18 P-1 Line #54 Volume 1 - 662 === page 699 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 843040 / POWER CONDITIONING EQUIPMENT Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 3: Depot Plant+Mtrls Handling Eq ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Procurement Quantity (Units in Each) - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 13.443 13.711 14.444 - 14.444 14.727 14.890 15.170 15.473 - Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 13.443 13.711 14.444 - 14.444 14.727 14.890 15.170 15.473 - Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 13.443 13.711 14.444 - 14.444 14.727 14.890 15.170 15.473 - Total 101.858 101.858 101.858 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Mission Description: The Power Conditioning and Continuation Interfacing Equipment (PCCIE) program is critical to ensuring the quality, reliability, and continuity of electrical power supplied to essential Air Force systems. This program designs, develops, tests, and fields power conditioning and uninterruptible power supply (UPS) equipment necessary to support mission-critical assets such as communication systems, radar, data centers, hospitals, industrial processes, and command and control systems. The program replaces aging and legacy UPS units, ensuring operational resilience against electrical disturbances, outages, and environmental factors that compromise power integrity. As a multi-year effort, the PCCIE program addresses emergent requirements and supports ongoing modernization to meet growing demand and address legacy system obsolescence. Key Objectives: 1. Power Quality Improvement: Reduces harmonic distortion, voltage fluctuations, and electrical disturbances. 2. Operational Continuity: Provides uninterrupted power during outages or disturbances. 3. Efficiency and Reliability: Optimizes power efficiency, minimizes energy losses, and extends mean time between failures (MTBF). 4. UPS Modernization: Supports the transition to next-generation UPS systems, reducing maintenance costs and increasing system uptime. Program Components: • Power Conditioning Equipment: Procurement of voltage regulators, harmonic filters, and power factor correction devices. • Continuation Interfacing Equipment: UPS systems, transfer switches, and backup power systems. • Fielding and Installation: Deploys and installs UPS systems across Air Force bases, with flexibility for tailored installations to meet mission-specific needs. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. • Program elements associated with this are: 27510F, 52834F, and 52844F. • Funding for this exhibit contained in PE 0207510F Secondary Distribution AF FY 2025 Quantity Total Obligation Authority LI 843040 - POWER CONDITIONING EQUIPMENT Air Force FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 12.358 12.602 13.296 - 13.296 - - - - UNCLASSIFIED Page 1 of 9 P-1 Line #55 Volume 1 - 663 === page 700 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 843040 / POWER CONDITIONING EQUIPMENT Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 3: Depot Plant+Mtrls Handling Eq ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Secondary Distribution AFNG FY 2025 Quantity Total Obligation Authority AFR Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 843040 - POWER CONDITIONING EQUIPMENT Air Force FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 0.961 0.983 1.019 - 1.019 - - - - - - - - - - - - - 0.124 0.126 0.129 - 0.129 - - - - - - - - - - - - - 13.443 13.711 14.444 - 14.444 - - - - UNCLASSIFIED Page 2 of 9 P-1 Line #55 Volume 1 - 664 === page 701 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 843040 / POWER CONDITIONING EQUIPMENT Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 3: Depot Plant+Mtrls Handling Eq ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 POWER CONDITIONING EQUIPMENT P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 13.443 - / 13.711 - / 14.444 - / - - / 14.444 - / - - / 13.443 - / 13.711 - / 14.444 - / - - / 14.444 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Justification: The Power Conditioning and Continuation Interfacing Equipment (PCCIE) program addresses critical Air Force infrastructure needs by ensuring the quality and continuity of electrical power supplied to essential systems. The program mitigates risks associated with aging and obsolete Uninterruptible Power Supply (UPS) units that support mission-critical facilities, such as data centers, command and control systems, radar, and medical infrastructure. The PCCIE program prioritizes the replacement of aging UPS systems, focusing on units that have exceeded their operational lifespan of 12-15 years. The program ensures uninterrupted operations, reducing downtime caused by electrical disturbances and outages. Cost Justification: 1. Aging Equipment: Over 70% of UPS units in the Air Force inventory exceed 15 years of service, leading to increased failures and reduced reliability. The funding will enable the replacement of systems nearing or beyond their lifespan. 2. Operational Continuity: Failure of UPS systems can lead to mission-critical downtime. This procurement ensures operational readiness by providing uninterrupted power to essential facilities. 3. Cost Savings: Modern UPS systems offer improved energy efficiency and reduced maintenance costs, providing a 30-50% reduction in lifecycle sustainment expenses. 4. Scalability and Flexibility: Procurement addresses immediate replacement needs while supporting future expansion and upgrades aligned with mission growth. FY27 funding will be used to acquire, procure and deliver multiple UPS systems that directly support the DoW's power infrastructure and missions world-wide. LI 843040 - POWER CONDITIONING EQUIPMENT Air Force UNCLASSIFIED Page 3 of 9 P-1 Line #55 Volume 1 - 665 === page 702 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 843040 / POWER CONDITIONING EQUIPMENT Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: POWER CONDITIONING EQUIPMENT MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 13.443 13.711 14.444 - 14.444 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 13.443 13.711 14.444 - 14.444 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 13.443 13.711 14.444 - 14.444 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Power Conditioning Equipment Cost Recurring Cost (†) - - - 0.259 52 13.443 0.254 54 13.711 0.258 56 14.444 - - - 0.258 56 14.444 Subtotal: Recurring Cost - - - - - 13.443 - - 13.711 - - 14.444 - - - - - 14.444 Subtotal: Hardware - Power Conditioning Equipment Cost - - - - - 13.443 - - 13.711 - - 14.444 - - - - - 14.444 Gross/Weapon System Cost - - - - - 13.443 - - 13.711 - - 14.444 - - - - - 14.444 4E9B50 Remarks: The procurement efforts for mission-critical infrastructure, including the Power Conditioning and Continuation Interfacing Equipment (PCCIE) program, have evolved over multiple fiscal years to address operational sustainment and modernization objectives. Previous acquisitions focused on replacing legacy Uninterruptible Power Supply (UPS) units, maintaining a stable power environment for essential military operations, and ensuring compliance with Department of War (DoW) procurement regulations. The PCCIE program, operating under a Multiple Award Contract (MAC) framework, has executed procurement efforts allowing flexibility in cost allocation and risk management. Budget allocations from FY2025 and FY2026 supported both emergency and scheduled UPS replacements, with procurement cycles adjusted based on available funding and contractor readiness. Secondary Distribution AF Quantity Total Obligation Authority AFNG Quantity Total Obligation Authority LI 843040 - POWER CONDITIONING EQUIPMENT Air Force FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total - - - - - 12.358 12.602 13.296 - 13.296 - - - - - 0.961 0.983 1.019 - 1.019 UNCLASSIFIED Page 4 of 9 P-1 Line #55 Volume 1 - 666 === page 703 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 3 P-1 Line Item Number / Title: 843040 / POWER CONDITIONING EQUIPMENT ID Code (A=Service Ready, B=Not Service Ready) : A Secondary Distribution AFR Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority Item Number / Title [DODIC]: POWER CONDITIONING EQUIPMENT MDAP/MAIS Code: FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total - - - - - 0.124 0.126 0.129 - 0.129 - - - - - 13.443 13.711 14.444 - 14.444 indicates the presence of a P-5a LI 843040 - POWER CONDITIONING EQUIPMENT Air Force UNCLASSIFIED Page 5 of 9 P-1 Line #55 Volume 1 - 667 === page 704 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 3 FY Contractor and Location (†) 2025 Various / Various C / IDIQ AFLCMC Hill AFB Oct 2024 Jan 2025 52 0.259 Y (†) 2026 Various / Various C / IDIQ AFLCMC Hill AFB Oct 2025 Jan 2026 54 0.254 Y (†) 2027 Various / Various C / IDIQ AFLCMC Hill AFB Oct 2026 Jan 2027 56 0.258 Y 4E9B50 4E9B50 4E9B50 (†) Item Number / Title [DODIC]: POWER CONDITIONING EQUIPMENT Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 843040 / POWER CONDITIONING EQUIPMENT Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date indicates the presence of a P-21 Remarks: The PCCIE program utilizes a Multiple Award Contract (MAC) with four prime contractors: Eaton Corporation, M.C. Dean Inc., CSI Electrical Contractors Inc., and Allcom Electric Inc. These contractors bid for each UPS replacement project, ensuring competitive pricing and technological expertise. The acquisition process follows the Lowest Price Technically Acceptable (LPTA) approach to balance affordability with technical performance. LI 843040 - POWER CONDITIONING EQUIPMENT Air Force UNCLASSIFIED Page 6 of 9 P-1 Line #55 Volume 1 - 668 === page 705 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 843040 / POWER CONDITIONING EQUIPMENT Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 3 Cost Elements (Units in Each) O O C M F R # PROC QTY Item Number / Title [DODIC]: POWER CONDITIONING EQUIPMENT Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT O C T A - FY SERVICE 1 2025 AF 52 0 52 1 2026 AF 54 0 54 1 2027 AF 56 0 56 Calendar Year 2025 N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 4E9B50 - - 5 4 5 4 5 4 5 4 4 4 4 A - 4 - 0 - 4 5 4 5 4 5 4 5 4 14 56 O C T N O V D E C LI 843040 - POWER CONDITIONING EQUIPMENT Air Force J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 9 S E P O C T N O V D E C J A N F E B P-1 Line #55 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 669 === page 706 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 843040 / POWER CONDITIONING EQUIPMENT Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 3 Cost Elements (Units in Each) O O C M F R # PROC QTY Item Number / Title [DODIC]: POWER CONDITIONING EQUIPMENT Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT FY SERVICE 1 2025 AF 52 52 0 1 2026 AF 54 40 14 1 2027 AF 56 0 56 Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 4E9B50 0 5 4 A O C T 5 N O V 0 D E C LI 843040 - POWER CONDITIONING EQUIPMENT Air Force 5 J A N 4 F E B 5 M A R 4 A P R 5 M A Y 4 J U N 5 J U L 4 A U G UNCLASSIFIED Page 8 of 9 5 S E P 5 O C T 5 N O V 5 D E C 0 J A N F E B P-1 Line #55 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 670 === page 707 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 843040 / POWER CONDITIONING EQUIPMENT Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 3 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: POWER CONDITIONING EQUIPMENT Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Various - Various MSR For 2027 1-8-5 For 2027 MAX For 2027 8 8 60 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 1 Manufacturing PLT 1 Total After Oct 1 3 Remarks: Power Conditioning and Continuation Interfacing Equipment (PCCIE) Program Appropriation: 3080 (Other Procurement, Air Force) | Budget Year: FY2027 The PCCIE program ensures reliable Uninterruptible Power Supply (UPS) systems for mission-critical Air Force operations. Procurement follows a Multiple Award Contract (MAC) framework with vendors Eaton, MCDean, CSI, and AllCom. The FY2027 acquisition plan continues the replacement of aging infrastructure "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 843040 - POWER CONDITIONING EQUIPMENT Air Force UNCLASSIFIED Page 9 of 9 P-1 Line #55 Volume 1 - 671 4 === page 708 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 672 === page 709 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 843050 / Mechanized Material Handling Equip Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 3: Depot Plant+Mtrls Handling Eq ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 28.429 20.459 21.928 24.594 - 24.594 20.235 20.620 21.012 21.432 - - - - - - - - - - - - 28.429 20.459 21.928 24.594 - 24.594 20.235 20.620 21.012 21.432 - - - - - - - - - - - - 28.429 20.459 21.928 24.594 - 24.594 20.235 20.620 21.012 21.432 - Total 178.709 178.709 178.709 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The Mechanized Material Handling Equipment (MMHE) Program supports the Air Force's logistics and sustainment mission by providing efficient storage, handling, and distribution capabilities globally across Air Force installations. This program ensures readiness and operational continuity through modernization and automation of material handling processes. The MMHE program enhances supply chain operations, base-level aircraft maintenance functions, air transportation logistics, and warehouse management by deploying advanced materials handling solutions. The MMHE line provides funding for static and automated materials handling equipment to efficiently store, receive, and ship materiel at Air Force bases worldwide. MMHE involves the design and acquisition of mechanized and non-mechanized materials handling systems to modernize and enhance supply operations, base-level aircraft maintenance, air transportation missions, and other warehouse and storage processes. Most MMHE is one of the following equipment types: • Material Storage and Distribution Systems, which consists of equipment within a warehouse or aircraft hangar used to receive, store, and ship material. Common types of equipment include racks, shelving, modular cabinets, mezzanines, mobile aisle systems, conveyors, vertical lift modules, vertical carousels, narrow-aisle warehouse trucks, and overhead cranes. • Aerial Port Equipment for air transportation, which includes heavy-duty freight handling 463L pallet conveyors, pallet buildup/breakdown lift stations, cargo storage racks, and overhead bridge cranes for air freight terminal systems; roller conveyors and overhead cranes for aerial delivery systems; and inbound and outbound baggage conveyors and passenger boarding bridges for air passenger terminals. • External Aircraft Fuel Tank Storage Systems, which are used to store and access external aircraft fuel tanks. Adequately equipped facilities are essential to the storage and handling of weapon system components, mobility gear, supply items, and for rapid processing of personnel, freight, and baggage. Proper MMHE reduces pipeline time, reduces damage to weapon system components during handling and storage, and enhances personnel safety. MMHE provides enhanced Air Force capability to respond to crises and threats whenever they occur in the world. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. Funding for this exhibit is contained in PE 0207510F, 0207597F, 0401221F, 0502834F, 0502844F, and 0504120F. LI 843050 - Mechanized Material Handling Equip Air Force UNCLASSIFIED Page 1 of 11 P-1 Line #56 Volume 1 - 673 === page 710 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 843050 / Mechanized Material Handling Equip Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 3: Depot Plant+Mtrls Handling Eq ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Secondary Distribution AF Quantity Total Obligation Authority AFNG Quantity Total Obligation Authority AFR Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 843050 - Mechanized Material Handling Equip Air Force FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 17.134 19.378 22.324 - 22.324 - - - - - - - - - - - - - 2.375 1.875 2.270 - 2.270 - - - - - - - - - - - - - 0.950 0.675 0.000 - 0.000 - - - - - - - - - - - - - 20.459 21.928 24.594 - 24.594 - - - - UNCLASSIFIED Page 2 of 11 P-1 Line #56 Volume 1 - 674 === page 711 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 843050 / Mechanized Material Handling Equip Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 3: Depot Plant+Mtrls Handling Eq ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Mechanized Material Handling Equip P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 28.429 - / 20.459 - / 21.928 - / 24.594 - / - - / 24.594 - / 28.429 - / 20.459 - / 21.928 - / 24.594 - / - - / 24.594 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: This program is a new start. This program is a new start only for PE 0504120F. All other PEs continue from FY 2026 and are not new starts. FY 2027 procurement funds for Mechanized Material Handling Equipment (MMHE) increases the productivity of Air Force operations, enhances management control of assets, reduces multiple handling of logistics materiel by consolidating assets, enhances safety, reduces losses due to damage of materiel during storage and transport, and reduces congestion and delays in the receiving, storage and issue operations in supply, base-level aircraft maintenance, air transportation, and other warehouse and storage facilities. Aerial port MMHE is vital to maintain and enhance rapid deployment and sustainment capabilities. Funds will also procure MMHE to support the KC-46A program at various Main Operating Bases (MOBs). FY 2027 MMHE is to be purchased in the following quantities: • 21 material storage and distribution systems • 6 aerial port equipment systems Program Support Costs are included. LI 843050 - Mechanized Material Handling Equip Air Force UNCLASSIFIED Page 3 of 11 P-1 Line #56 Volume 1 - 675 === page 712 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 843050 / Mechanized Material Handling Equip Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Mechanized Material Handling Equip MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - FY 2025 - FY 2026 - - - FY 2027 Total - 28.429 20.459 21.928 24.594 - 24.594 - - - - - - 28.429 20.459 21.928 24.594 - 24.594 - - - - - - 28.429 20.459 21.928 24.594 - 24.594 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) Total Cost Qty ($ M) (Each) ($ M) Hardware - Mechanized Material Handling Equip Cost Non Recurring Cost MATERIAL STORAGE AND DISTRIBUTION SYSTEMS (†) AERIAL PORT (†) EQUIPMENT Subtotal: Non Recurring Cost Subtotal: Hardware Mechanized Material Handling Equip Cost 0.637 21 13.367 0.636 23 14.622 0.812 18 14.617 0.703 21 14.762 - - - 0.703 21 14.762 3.012 5 15.062 1.107 5 5.537 3.468 2 6.936 1.580 6 9.482 - - - 1.580 6 9.482 - - 28.429 - - 20.159 - - 21.553 - - 24.244 - - - - - 24.244 - - 28.429 - - 20.159 - - 21.553 - - 24.244 - - - - - 24.244 Support - Mechanized Material Handling Equip Cost Program Support Costs Other Government Costs - - - - - 0.150 - - 0.175 - - 0.200 - - - - - 0.200 Program Support Costs Contractor Services - - - - - 0.150 - - 0.200 - - 0.150 - - - - - 0.150 Subtotal: Support Mechanized Material Handling Equip Cost - - - - - 0.300 - - 0.375 - - 0.350 - - - - - 0.350 Gross/Weapon System Cost - - 28.429 - - 20.459 - - 21.928 - - 24.594 - - - - - 24.594 Remarks: FY 2025-2027 includes additional funding procure Mechanized Material Handling Equipment (MMHE) to support the bed down of the KC-46A program at various Main Operating Bases (MOBs). LI 843050 - Mechanized Material Handling Equip Air Force UNCLASSIFIED Page 4 of 11 P-1 Line #56 Volume 1 - 676 === page 713 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 3 P-1 Line Item Number / Title: 843050 / Mechanized Material Handling Equip ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Mechanized Material Handling Equip MDAP/MAIS Code: There is no standard system design. Each system of a given type of equipment is uniquely designed for a specific building or base and type of mission, so no two are alike. Unit cost is the average cost of all equipment of that type being installed at all bases within the FY. Therefore, it is not expected or desirable for unit cost to be approximately the same from year to year. Note: Totals or subtotals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Secondary Distribution AF Quantity Total Obligation Authority AFNG Quantity Total Obligation Authority AFR Quantity Total Obligation Authority Total: Secondary Distribution (†) Quantity Total Obligation Authority FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total - - - - - 17.134 19.378 22.324 - 22.324 - - - - - 2.375 1.875 2.270 - 2.270 - - - - - 0.950 0.675 0.000 - 0.000 - - - - - 20.459 21.928 24.594 - 24.594 indicates the presence of a P-5a LI 843050 - Mechanized Material Handling Equip Air Force UNCLASSIFIED Page 5 of 11 P-1 Line #56 Volume 1 - 677 === page 714 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 3 O O C Cost Elements MATERIAL STORAGE AND (†) DISTRIBUTION SYSTEMS MATERIAL STORAGE AND (†) DISTRIBUTION SYSTEMS MATERIAL STORAGE AND (†) DISTRIBUTION SYSTEMS MATERIAL STORAGE AND (†) DISTRIBUTION SYSTEMS MATERIAL STORAGE AND (†) DISTRIBUTION SYSTEMS (†) AERIAL PORT EQUIPMENT (†) AERIAL PORT EQUIPMENT (†) AERIAL PORT EQUIPMENT (†) AERIAL PORT EQUIPMENT (†) AERIAL PORT EQUIPMENT (†) AERIAL PORT EQUIPMENT (†) P-1 Line Item Number / Title: 843050 / Mechanized Material Handling Equip Item Number / Title [DODIC]: Mechanized Material Handling Equip FY Contractor and Location Method/Type or Funding Vehicle 2023 Various / Various Various AFLCMC Wright Patterson AFB Aug 2023 Aug 2024 10 0.583 Y 2024 Various / Various Various AFLCMC Wright Patterson AFB Aug 2024 May 2025 11 0.685 Y Feb 2024 Feb 2024 2025 Various / Various Various AFLCMC Wright Patterson AFB Aug 2025 May 2026 23 0.636 Y Feb 2025 Feb 2025 2026 Various / Various Various AFLCMC Wright Patterson AFB Aug 2026 May 2027 18 0.812 Y Feb 2026 Feb 2026 2027 Various / Various Various AFLCMC Wright Patterson AFB Aug 2027 May 2028 21 0.703 Y Feb 2027 Feb 2027 2022 RA Burch / Travis AFB C / FFP N/A Jan 2022 Oct 2025 1 7.694 Y Jun 2020 Aug 2023 Aug 2024 2 1.512 Y Apr 2023 Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date Dec 2022 2023 Various / Various Various AFLCMC Wright Patterson AFB 2024 Various / Various Various AFLCMC Wright Patterson AFB Aug 2024 Aug 2025 2 2.172 Y Feb 2024 Mar 2024 2025 Various / Various Various AFLCMC Wright Patterson AFB Aug 2025 Aug 2026 5 1.107 Y Feb 2025 Apr 2025 2026 Various / Various Various AFLCMC Wright Patterson AFB Aug 2026 Aug 2027 2 3.468 Y Feb 2026 Feb 2026 2027 Various / Various Various AFLCMC Wright Patterson AFB Aug 2027 Aug 2028 6 1.580 Y Feb 2027 Feb 2027 indicates the presence of a P-21 Remarks: There is no standard system design. Each system of a given type of equipment is uniquely designed for a specific mission and building. The result is that no two systems are alike. System cost is an average cost for all contracts of that type in a given year. Given the variation in types of projects, quantities of equipment required to meet mission requirements, and shipping and labor costs to various installations worldwide, no consistency in unit cost is expected from year to year. Nearly all projects are at a separate base and are put on separate contracts, so the response is 'Various' when the quantity is more than 1. Used the Air Force Life Cycle Management Center (AFLCMC) Wright Patterson Air Force Base (AFB) for location of Primary Contracting Office (PCO) because 'Various' is not an allowed option. Most buys are through that contracting office. Selected an average award date when the line refers to more than 1 project/contract. Selected an average date of first delivery when the line refers to more than 1 project/contract. Specs are not available at this time for future projects. Specifications will be developed following a design visit to the base receiving the equipment since the type, quantity, and configuration of the equipment depends on the mission requirements and facility constraints. LI 843050 - Mechanized Material Handling Equip Air Force UNCLASSIFIED Page 6 of 11 P-1 Line #56 Volume 1 - 678 === page 715 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 843050 / Mechanized Material Handling Equip Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Mechanized Material Handling Equip Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P MATERIAL STORAGE AND DISTRIBUTION SYSTEMS (1) 1 2023 AF 10 0 10 1 2024 AF 11 0 11 A - - 10 11 1 2025 AF 23 0 23 23 1 2026 AF 18 0 18 18 1 2027 AF 21 0 21 21 1 0 1 2 0 2 AERIAL PORT EQUIPMENT 2 2022 AF 3 2023 AF 3 2024 AF 2 0 2 2 3 2025 AF 5 0 5 5 3 2026 AF 2 0 2 2 3 2027 AF 6 0 6 (2) A - - - - - - - - - - - - - - - - - - - - - 1 A - - 2 6 O C T N O V D E C LI 843050 - Mechanized Material Handling Equip Air Force J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #56 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 679 === page 716 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 843050 / Mechanized Material Handling Equip Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Mechanized Material Handling Equip Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N Calendar Year 2025 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P MATERIAL STORAGE AND DISTRIBUTION SYSTEMS (1) 1 2023 AF 10 0 10 1 2024 AF 11 0 11 - - - - - - - - - - 2 - 1 2025 AF 23 0 23 1 2026 AF 18 0 18 18 1 2027 AF 21 0 21 21 1 0 1 - - - - - - - - - - 2 0 2 - - - - - - - - - - A - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 1 - 0 1 2 3 2 1 A - - 2 23 AERIAL PORT EQUIPMENT 2 2022 AF 3 2023 AF 3 2024 AF 2 0 2 3 2025 AF 5 0 5 3 2026 AF 2 0 2 3 2027 AF 6 0 6 (2) 1 A - - - - - - - - - - - - - - 1 - - - - - - - - - - - - - 1 - - - - - - - - - - - - 1 - 5 1 A - 2 6 O C T N O V D E C LI 843050 - Mechanized Material Handling Equip Air Force J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #56 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 680 === page 717 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 843050 / Mechanized Material Handling Equip Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Mechanized Material Handling Equip Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N Calendar Year 2027 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P MATERIAL STORAGE AND DISTRIBUTION SYSTEMS (1) 1 2023 AF 10 10 0 1 2024 AF 11 9 2 0 1 2025 AF 23 0 23 1 2026 AF 18 0 18 1 2027 AF 21 0 21 1 0 1 2 1 1 - - 1 1 - 0 - - - - - - 1 2 3 3 3 A - 3 - 2 - 2 - 2 - 1 - 1 - 0 - - 1 2 2 2 1 A - - 10 21 AERIAL PORT EQUIPMENT 2 2022 AF 3 2023 AF 3 2024 AF 2 1 1 - - 3 2025 AF 5 0 5 - - 3 2026 AF 2 0 2 3 2027 AF 6 0 6 (2) 1 0 - - 1 0 1 0 - - - - - - - - 1 1 A - 2 - 1 - 0 - - - - - - - - - 1 1 A O C T N O V D E C LI 843050 - Mechanized Material Handling Equip Air Force J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #56 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 681 0 6 === page 718 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 843050 / Mechanized Material Handling Equip Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Mechanized Material Handling Equip Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E MATERIAL STORAGE AND DISTRIBUTION SYSTEMS (1) 1 2023 AF 10 10 0 0 1 2024 AF 11 11 0 0 1 2025 AF 23 23 0 1 2026 AF 18 8 10 1 2027 AF 21 0 21 1 1 0 0 2 2 0 0 0 2 2 - 2 - 2 - 1 - 1 - 0 - - 1 2 3 3 3 3 3 2 1 0 AERIAL PORT EQUIPMENT 2 2022 AF 3 2023 AF 3 2024 AF 2 2 0 0 3 2025 AF 5 5 0 0 3 2026 AF 2 2 0 3 2027 AF 6 0 6 (2) 0 O C T N O V D E C LI 843050 - Mechanized Material Handling Equip Air Force J A N F E B M A R A P R M A Y J U N J U L 1 A U G UNCLASSIFIED Page 10 of 11 S E P 1 O C T N O V 1 D E C J A N 1 F E B P-1 Line #56 M A R 1 A P R M A Y 1 J U N 0 J U L A U G S E P Volume 1 - 682 === page 719 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 843050 / Mechanized Material Handling Equip Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 3 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: Mechanized Material Handling Equip Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Various - Various MSR For 2027 1-8-5 For 2027 MAX For 2027 21 21 30 2 RA Burch - Travis AFB 3 Various - Various 4 6 10 ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 1 11 9 20 0 0 0 0 0 0 0 0 0 0 0 0 1 11 12 23 0 0 0 0 Remarks: Mechanized Material Handling Equipment (MMHE) consists of commercial-off-the-shelf (COTS) items and will likely be awarded to multiple contractors. Therefore, production rates do not apply. Delivery schedules will vary by project/contract and are not standardized for this type of equipment. The decentralized procurement approach ensures that each system is tailored to meet unique mission and base requirements, supporting logistics operations without a fixed production cycle. The procurement timeline is determined on a case-by-case basis, with individual contracts reflecting specific Air Force base needs and operational requirements. The Air Force Life Cycle Management Center (AFLCMC) at Wright-Patterson Air Force Base (AFB) will oversee contracting efforts for most of these purchases. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (1) (2) Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. LI 843050 - Mechanized Material Handling Equip Air Force UNCLASSIFIED Page 11 of 11 P-1 Line #56 Volume 1 - 683 === page 720 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 684 === page 721 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 845010 / Base Procured Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 5: Base Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - 81.686 - 81.686 Procurement Quantity (Units in Each) - - Gross/Weapon System Cost ($ in Millions) - 75.054 Less PY Advance Procurement ($ in Millions) - - Net Procurement (P-1) ($ in Millions) - 75.054 Plus CY Advance Procurement ($ in Millions) - - Total Obligation Authority ($ in Millions) - 75.054 109.592 109.592 109.592 - - - 81.686 - 81.686 - - - 81.686 - 81.686 105.036 105.036 105.036 85.103 85.103 85.103 109.289 109.289 109.289 To FY 2031 Complete - - 81.914 - - - 81.914 - - - 81.914 - Total 647.674 647.674 647.674 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Base Procured Equipment: Organizations throughout the Air Force acquire authorized investment equipment from the General Services Administration, Defense Logistics Agency, and commercial sources when these items exceed 250,000 in cost or are unavailable through Air Force central procurement. Examples of equipment in this P-1 line typically include equipment and/or specialized tools for road and ground maintenance; vehicle maintenance; vehicle corrosion control; civil engineering maintenance; electrical and carpentry shops; specialized laboratories; kitchen and dining facilities; printing plants; microfilm, graphics support facilities; temporary relocatable facilities, training ranges; uninterruptible power supply systems, physiological trainers to include, but are not limited to Barney Chairs, Altitude Chambers, Spatial Disorientation Trainers, Hypoxia Familiarization Trainers and Part Task Trainers, Reduced Oxygen Breathing Devices, Terrain Boards, Parachuting Trainers, Aircrew Exercise Equipment, advanced manufacturing 3-D printers and cold spray machines, Rapid Sustainment Modernization (RSM) technologies to include automation and robotics equipment and Condition Based Maintenance Plus (CBM+) Sensor Based Algorithm (SBA) Vampire Boxes. Funding for this exhibit contained in PEs 0207142F, 0804741F, 0804701F, 0804731F, 0804752F, 0708051F, 0101233F, 0207410F, 0208007F, 0708051F, and 0208028F. Base Support Equipment: Organizations throughout the Air Force acquire authorized Support Equipment through Air Force central procurement. Examples of equipment in this P-1 line include equipment and/or specialized tools necessary for Aircraft Maintenance/Sustainment. Funding for this exhibit contained in PE 0804741F. USAFA Procured Equipment: Organizations throughout United States Air Force Academy (USAFA) require specialized academic equipment that allows USAFA to be the premier Military Service Academy and attract our nation's best and brightest students. To accomplish this, organizations across USAFA must be able to utilize 3080 (Procurement) funding to acquire authorized investment equipment from the General Services Administration, Defense Logistics Agency, and commercial sources when these items exceed 350,000 or are unavailable through Air Force central procurement. The USAFA Education, Training, and Operations Mission requires the purchase and maintenance of STEM Laboratory equipment to include, but not limited to, Artificial Intelligence clusters, High-Performance Computing clusters, Quantum Computing, nuclear magnetic resonance spectrometers, single crystal x-rays, coating systems, time-resolved 3D Particle Tracking Velocimetry systems, Instron Hydraulic high-capacity tension, compression, LI 845010 - Base Procured Equipment Air Force UNCLASSIFIED Page 1 of 11 P-1 Line #57 Volume 1 - 685 === page 722 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 5: Base Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 845010 / Base Procured Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A bend/flex, and shear testing grips, 5989 Universal Test System and network analyzers for numerous engineering and space laboratories. Furthermore, USAFA is responsible for the management and recruitment of a Division-1 National Collegiate Athletic Association (NCAA) program spanning 27 teams, 1,000+ student athletes, and hundreds of events annually across nine different athletic conferences. It is imperative that investment equipment be purchased, life cycle managed, and properly maintained to remain in compliance with NCAA & Conference principles / bylaws as per DAFI 36-3501. Examples of this equipment include, but are not limited to, Hyperoxic equipment to support the human-performance laboratory, Audio Visual systems, and miscellaneous training equipment to support athletic and summer cadet leadership programs per Title 10 USC 9462. Funding for this exhibit contained in PE 0804721F. Funding for PE 0804701F, procures Advanced Pilot Training System Equipment. The equipment includes 24 sunshades (covering 48 aircraft) required by AFI 21-101, AETC Supplement, to provide protection for the aircraft and personnel from the elements, including intense sun and damaging hail. Sunshades extend the service life of expensive, sensitive aircraft systems in the cockpit and protects the aircrews and ground crews servicing the aircraft as they perform pre-flight, thru-flight, and post-flight maintenance activities. FY26 funding also addresses a critical shortage of secure explosive storage for T-7A ejection seat and canopy systems at AETC UPT wings through procurement of ARMAG prefabricated structures. Each location lacks adequate storage, compounded by strict segregation requirements, which if unaddressed will lead to unacceptably high Non-Mission Capable (NMC) aircraft rates, hindering pilot production. The ARMAGs will provide the approximately 1,855 sq ft of critically required space, enabling timely maintenance and preventing mission failure. Failure to fund this request will significantly increase the risk of NMC aircraft, negatively impacting AETC's pilot training mission. The funding will ensure compliance with explosive storage regulations (T.O. 11A-1-61-1 and AFMAN 91-201). Funding for this exhibit contained in PE 0804701F. Funding for this exhibit contained in PE 0708051F. Funding for PE 070851F enables the Rapid Sustainment Modernization (RSM) program to rapidly modernize sustainment practices, enhance readiness, and cut costs by identifying, assessing, developing, validating, verifying, and deploying cutting-edge technologies across the sustainment enterprise. This funding will primarily procure hardware and equipment supporting the fielding and deployment of Advanced Manufacturing capabilities. Capabilities include, but are not limited to, Cold Spray (depot, mobile, and expeditionary), Directed Energy Deposition, 3D printing (depot, mobile, and expeditionary), Automation and Robotics to streamline logistics and remove the human element from hazardous duties (i.e., sanding and painting airframes), and deliver rapidly deployable tools, equipment, and structures in support of Agile Combat Employment. In direct support of the Secretary of War's direction to increase readiness across the Department of War, efforts within this program element code (PEC) will be prioritized based on the National Defense Authorization Act (NDAA), United States Air Force (USAF) Force Design, Agile Combat Employment (ACE), and the Defense Planning Guide (DPG). Funding for this exhibit contained in PE 0207410F. PE 0207410F: No FY 2027 funding required. Funding for this exhibit contained in PE 0208007F. Funding for PE 0208007F supports the Tactical Deception program (Tac-D). Tad-D is a Service program to provide a suite of technologies that will enable the USAF to minimize, distort, or create signatures. This includes technologies to confuse or mislead all major categories of adversary sensors. These capabilities can reduce confidence in adversary assessments, exhaust intelligence enterprises, and disrupt targeting cycles. In addition, these technologies and tactics techniques and procedures (TTPs) can be employed across the competition continuum for deterrence or advantage in conflict. Tac-D, Counter- Intelligence, Surveillance, and Reconnaissance (C-ISR) also supports all activities and costs needed to support the Air Force to further these types of development projects, as well as required program support costs (PSC). Funding for this exhibit contained in PE 0101233F. Shielded Enclosure in accordance with NSA standards to house Weapon System (WS) equipment for processing of critical information. Modular equipment option allows shielded enclosure design flexibility due LI 845010 - Base Procured Equipment Air Force UNCLASSIFIED Page 2 of 11 P-1 Line #57 Volume 1 - 686 === page 723 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 5: Base Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 845010 / Base Procured Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A to WS maturity. Stationary X-ray inspection system designed to scan vehicles and cargo for potential threats including organic materials, explosives, and contraband using top-down and dual-side fields of view. The system delivers high-resolution, easily interpretable images to support rapid threat detection and streamlined security operations. PE 0101233F (Sentinel): No FY2027 funding required. LI 845010 - Base Procured Equipment Air Force UNCLASSIFIED Page 3 of 11 P-1 Line #57 Volume 1 - 687 === page 724 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 845010 / Base Procured Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 5: Base Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Base Procured Equipment P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 75.054 - / 109.592 - / 81.686 - / - - / 81.686 - / - - / 75.054 - / 109.592 - / 81.686 - / - - / 81.686 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: PE 0708051F: FY 2027 funding procures Rapid Sustainment Modernization equipment including Advanced Manufacturing 3-D printers for depots and field units and directed energy deposition (DED) cold spray equipment for depots. Automation and Robotics funding procures Robotic Sheet Forming Machines. Approved Rapid Sustainment Improvement Process (RSIP) projects included in the PB. Advanced Manufacturing - FY 2027 increased compared to FY 2026 by 0.720 million due to expansion of various 3D printing and DED technologies requirements for depots and field-units. Automation and Robotics - FY 2027 increased compared to FY 2026 by 0.260 million due to inflation. Condition Based Maintenance Plus (CBM+) - FY 2027 decreased compared to FY 2026 by 0.999 million due to hardware requirement unit cost below cost threshold for Other Procurement, Air Force. Requirement funded in Operations and Maintenance (O&M) budget. PE 0207142F: FY 2027 funding procures F-35 Base Procured Equipment to include, a Lightning Modular Extendable Rigid Wall Shelter (LMERWS) which is a secure mobile facility for worldwide deployment that fulfills unique requirements for Autonomic Logistics Information System (ALIS)/Operational Data Integrated Network (ODIN), peripherals, F-35 intelligence operations, mission planning, Government Systems Security Officer (GSSO), Information Systems Security Officer (ISSO), and allows for pre/post-flight briefings. The F-35 is non-employable without LMERWS to perform mission planning, maintenance, and sortie generation. Aircraft Sunshades that provide the F-35 with lightning protection and enable all weather maintenance operations by protecting personnel from inclement and extreme weather conditions. Temporary Shelters are required in accordance with F-35 base Interim Operating Plans (IOP). Temporary Shelters allow for the timely delivery of the F-35 and for unit Initial Operating Capability independent of MILCON and FSRM project progress. Intrusion Detection Systems (IDS) for F-35 facilities in compliance with AFI 31-101 and ICD 705 requirements. Facilities without IDS cannot have PL resources stored, staged, or hangered without being continuously monitored by the owner/user of the facility. Secure spaces that do not meet ICD 705 requirements cannot be accredited and cannot be used to process classified information. IDS allows for the full operation and utilization of facilities required for F-35 mission success. PE 0804701F: FY 2027 funding procures Advanced Pilot Training System Equipment. After long delays, the first T-7 aircraft will arrive at pilot training bases across the Air Force beginning in FY26. Procurement of Sunshades are behind schedule for this arrival. Without Smart Sunshades technology vital training of new AF pilots will be lost with loss of ability to collect aircraft data for mission rehearsal and maintenance outbrief. The sunshades provide the the smart link between the aircraft and Maintenance and Operation Debrief Stations, and will aid in keeping the temperature of the electronics inside the aircraft to allow maintenance and pre-flight to occur. Without the sunshades, there could be loss of training due loss of debrief data transfer, overheating of the aircraft electronics, and subjecting aircrews and pilots from environmental impacts. PE 0804731F: FY 2027 funding procures a live fire burn-space trainer required to fulfill evolutions for structural fire, coordinated attack, and hose and sprinkler operations training objectives as required by DoDM 6055.6, the National Fire Protection Association (NFPA) Standard 1072 and 1000 series, the International Fire Services Accreditation Congress, and ProBoard for 1,300 DoW and International Fire Protection Students annually. Trainers provide ability to award 3 of the 6 required national certifications; Firefighter I, Firefighter II, and Airport Rescue Firefighter. The existing burn trainer was built in 1994 and is scheduled for demolition in FY25. In 2018, a NFPA 1403 (NFPA live-fire training structure evaluation) was conducted on the trainer and determined to be in extremely poor condition with a recommended to replace the trainer as soon as possible. Special Warfare investment equipment supporting the Pararescue/Combat Rescue Officer, Combat Controller/Special Tactics Officer, Tactical Air C2/Air Liaison, and Special Operations Weather career fields. PE 0804752F: FY 2027 funding procures Professional Training Equipment. AFIT's Engineering Graduate School maintains a strong applied-research focus through seven multi-disciplinary research centers: Autonomy and Navigation Technology Center, Center for Cyberspace Research, Center for Directed Energy, Center for Space Research and Assurance, Center for Technical Intelligence Studies and Research, LI 845010 - Base Procured Equipment Air Force UNCLASSIFIED Page 4 of 11 P-1 Line #57 Volume 1 - 688 === page 725 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 5: Base Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 845010 / Base Procured Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Homeland Security Community of Best Practices, and the Nuclear Expertise for Advancing Technologies Center. Additionally, AFIT is designated as the Air Force's Cyberspace Technical Center of Excellence and is the home of the Scientific Test and Analysis Techniques Center of Excellence, which delivers independent, tailored application of STAT to support test and evaluation teams across the Department of War and Department of Homeland Security. The Graduate School equipment requirements vary each year based on the research projects being requested. A more specific example of the types of equipment this funding supports is to procure a 5-axis Computerized Numerical Control milling machine used to create custom research test fixtures and research apparatuses for AFIT students and faculty members conducting advanced DOW-focused research across multiple disciplines (for example: hypersonics, aerodynamics, custom devices for fundamental physics exploration, and a host of other technical applications). Additionally, AFIT will procure a high-speed, hyper-spectral, thermal imaging system that operates in the long-wave infrared (LWIR) band that will enable AFIT to conduct research that couldn't be done previously (for example, long-wave hyperspectral imaging of fast events such as explosion dynamics). PE 0208007F: FY 2027 funding procures Tac-D assets in accordance with in-development MAJCOM and COCOM requirements. Due to the level of classification of these efforts, additional details will be provided upon request through the appropriate forum. PE 0804721F: FY 2027 funding procures 3 pieces of STEM lab equipment. PE 0207410F: No FY 2027 funding required. PE 0101233F: No FY 2027 funding required. LI 845010 - Base Procured Equipment Air Force UNCLASSIFIED Page 5 of 11 P-1 Line #57 Volume 1 - 689 === page 726 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 845010 / Base Procured Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Base Procured Equipment MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 Procurement Quantity (Units in Each) - - Gross/Weapon System Cost ($ in Millions) - 75.054 Less PY Advance Procurement ($ in Millions) - - Net Procurement (P-1) ($ in Millions) - 75.054 Plus CY Advance Procurement ($ in Millions) - - Total Obligation Authority ($ in Millions) - 75.054 FY 2027 Base FY 2027 OOC - - - 81.686 - 81.686 109.592 109.592 - - - 81.686 - 81.686 109.592 FY 2027 Total - - - 81.686 - 81.686 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Base Procured Equipment Cost Recurring Cost PE 0708051F RSM Advanced Manufacturing - 3D printers and Coldspray equipment - - - - - 14.472 - - 14.771 - - 15.491 - - - - - 15.491 PE 0708051F RSM Technologies and Automation and Robotics - - - - - 20.465 - - 6.901 - - 7.161 - - - - - 7.161 - - - 0.678 1 0.678 23.688 1 23.688 18.201 1 18.201 - - - 18.201 1 18.201 - - - 22.850 1 22.850 19.656 1 19.656 14.853 1 14.853 - - - 14.853 1 14.853 PE 0804731F Base Procured Training Equipment for General Skills Training - - - 3.979 1 3.979 4.059 1 4.059 4.244 1 4.244 - - - 4.244 1 4.244 PE 0804752F Professional Training Equipment - - - - - 3.575 - - 3.620 3.745 1 3.745 - - - 3.745 1 3.745 PE 0708051F RSM CBM+ SBA Vampire/ ADR Boxes. - - - - - 2.002 - - 0.999 - - - - - - PE 0207142F F-35 Base Procured (†) Equipment PE 0804701F Advanced Pilot Training System (†) Equipment LI 845010 - Base Procured Equipment Air Force UNCLASSIFIED Page 6 of 11 - P-1 Line #57 - - Volume 1 - 690 === page 727 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 845010 / Base Procured Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Base Procured Equipment MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) PE 0804721F Lab and Cadet Support Equipment - - - 0.575 PE 0101233F LGM-35A Sentinel Temporary Relocatable Facilities and Equipment - - - - PE 0401221F KC-46 Tanker Squadron - - - PE 0207410F STAOC IDS/ACS SYS - - PE 0207410F STAOC Cross Domain Data Delivery Solution - PE 0502625F Air Base Security Forces (ANG) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) 7 ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) 4.025 0.910 2 1.820 0.649 - - 23.923 1 23.923 - - - 1.008 - 1.170 - - - - 1.350 1 - - - - - 7.635 1 - - - - - 2.000 - PE 0208007F Tactical Deception - - - - - - PE 0208028F Contingency Operations - - - - - FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) 1.946 - - - 0.649 - - - - - - - - - - 1.275 - - - - - 1.275 1.350 - - 0.000 - - - - - 0.000 7.635 - - 0.000 - - - - - 0.000 - - - - - - - - - - - - - - - - 12.200 - - - - - 12.200 - - - - - - 2.570 - - - - - 2.570 - 3 ($ M) FY 2027 Total Total Cost 3 1.946 Subtotal: Recurring Cost - - - - - 75.054 - - 109.592 - - 81.686 - - - - - 81.686 Subtotal: Hardware - Base Procured Equipment Cost - - - - - 75.054 - - 109.592 - - 81.686 - - - - - 81.686 Gross/Weapon System Cost - - - - - 75.054 - - 109.592 - - 81.686 - - - - - 81.686 Remarks: PE 0804721F: STEM Lab equipment items for USAFA Dean of Faculty and other equipment supporting Cadets. (†) indicates the presence of a P-5a LI 845010 - Base Procured Equipment Air Force UNCLASSIFIED Page 7 of 11 P-1 Line #57 Volume 1 - 691 === page 728 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 O O C Cost Elements PE 0207142F F-35 Base Procured (†) Equipment PE 0207142F F-35 Base Procured (†) Equipment PE 0207142F F-35 Base Procured (†) Equipment PE 0804701F Advanced Pilot Training System Equipment (†) PE 0804701F Advanced Pilot Training System Equipment (†) PE 0804701F Advanced Pilot Training System Equipment (†) (†) P-1 Line Item Number / Title: 845010 / Base Procured Equipment Item Number / Title [DODIC]: Base Procured Equipment FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) 2025 Various / Various TBD TBD Jan 2025 Sep 2025 1 0.678 Y Nov 2024 2026 Various / Various TBD TBD Jan 2026 Sep 2026 1 23.688 Y Nov 2025 2027 Various / Various TBD TBD Jan 2027 Sep 2027 1 18.201 Y 2025 Various / Various TBD TBD Jan 2025 Sep 2025 1 22.850 Y Nov 2023 2026 Various / Various TBD TBD Jan 2026 Sep 2026 1 19.656 Y Nov 2023 2027 Various / Various TBD AFIMSC Jan 2027 Sep 2027 1 14.853 Y Nov 2023 Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 845010 - Base Procured Equipment Air Force UNCLASSIFIED Page 8 of 11 P-1 Line #57 Volume 1 - 692 === page 729 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 845010 / Base Procured Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Base Procured Equipment Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P PE 0207142F F-35 Base Procured Equipment 1 2025 AF 1 0 1 1 2026 AF 1 0 1 1 2027 AF 1 0 1 A - - - - - - - - 1 0 A - - - - - - - - 1 0 1 PE 0804701F Advanced Pilot Training System Equipment 2 2025 AF 1 0 1 2 2026 AF 1 0 1 2 2027 AF 1 0 1 A - - - - - - - - 1 0 A - - - - - - - - 1 0 1 O C T LI 845010 - Base Procured Equipment Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #57 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 693 === page 730 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 845010 / Base Procured Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Base Procured Equipment Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Fiscal Year 2028 Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E PE 0207142F F-35 Base Procured Equipment 1 2025 AF 1 1 0 1 2026 AF 1 1 0 1 2027 AF 1 0 1 0 0 A - - - - - - - - 1 0 PE 0804701F Advanced Pilot Training System Equipment 2 2025 AF 1 1 0 2 2026 AF 1 1 0 2 2027 AF 1 0 1 0 0 A O C T LI 845010 - Base Procured Equipment Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 11 1 S E P 0 O C T N O V D E C J A N F E B P-1 Line #57 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 694 === page 731 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 845010 / Base Procured Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 Item Number / Title [DODIC]: Base Procured Equipment Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Various - Various 1 1 1 1 4 8 12 0 0 0 0 2 Various - Various 1 1 1 1 4 8 12 0 0 0 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 845010 - Base Procured Equipment Air Force UNCLASSIFIED Page 11 of 11 P-1 Line #57 Volume 1 - 695 === page 732 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 696 === page 733 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 845100 / Engineering and EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 5: Base Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) - Gross/Weapon System Cost ($ in Millions) - Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) - Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) - FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 203.531 203.531 203.531 258.799 258.799 258.799 247.989 - - 247.989 - - 247.989 - 247.989 247.989 247.989 211.841 211.841 211.841 173.685 173.685 173.685 150.289 150.289 150.289 To FY 2031 Complete - - 98.505 - - - 98.505 - - - 98.505 - Total 1,344.639 1,344.639 1,344.639 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: This budget line funds the procurement of a multitude of Explosive Ordnance Disposal (EOD) and Engineering capabilities critical to the Air Force's ability to provide Integrated Base Response and Recovery (IBRR) and Air Base Resiliency in highly contested environments, both in-garrison and in support of contingency operations. IBRR is defined as the whole of installation effort to restore operational and support mission capabilities after a damaging wartime or peacetime event. Damaging wartime or peacetime events range from natural and man-made disasters to Chemical, Biological, Radiological, and Nuclear (CBRN), kinetic, and cyber attacks. Air Base Resiliency refers to the capability of operating locations to sustain the projection of combat power by protecting against, responding to, and reconstituting from deliberate, accidental, or naturally occurring events such as those previously listed. Procurements include the EOD identify, mitigate, and defeat Family of Systems (FoS), Chemical, Biological, Radiological, and Nuclear (CBRN) detection and identification systems, hardening, a portion of the Rapid Airfield Damage Recovery (RADR) FoS, and tactical communications packages for the Air Force Civil Engineer enterprise. EOD FoS includes systems and equipment needed for EOD personnel to operate in the full spectrum of the competition continuum by identifying, mitigating, and defeating explosive hazards from Unexploded Ordnance (UXO), Improvised Explosive Devices (IEDs), aerospace systems, conventional munitions, and Weapons of Mass Destruction (WMD). CBRN detection and identification systems include the Radiological Detection System (RDS), and Radioisotope Identification Device (RIID). These systems provide the capability to measure, identify, geo-locate, and transmit data on radiological and nuclear materials. Additionally, this budget line includes the Dismounted Reconnaissance Set, Kits, and Outfits (DR SKO) that provides on-site identification and personal protection from chemical and biological contamination. Hardening refers to the ability to protect critical assets from enemy attack. Within hardening, this budget line specifically funds the Expedient Small Asset Protection (ESAP) hardened shelter system. The ESAP system provides protection from specific munitions and is designed to house fighter aircraft and critical sortie generation equipment. The RADR FoS consists of capabilities that contribute to three distinct phases of airfield recovery; Rapid Damage Assessment (RDA), Rapid Explosive Hazard Mitigation (REHM), and Rapid Damage Repair (RDR). Within RDA, this budget line specifically funds the Rapid Airfield Damage Assessment System (RADAS), which consists of four Small Unmanned Aerial Systems (SuAS) equipped with Electro-optical (EO) and Long Wave Infrared (LWIR) sensors, switch and network cabling, and two mobile workstations. LI 845100 - Engineering and EOD Equipment Air Force UNCLASSIFIED Page 1 of 12 P-1 Line #58 Volume 1 - 697 === page 734 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 5: Base Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 845100 / Engineering and EOD Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Within REHM, this budget line specifically funds the Recovery of Airfield Denied By Ordnance (RADBO), which consists of the Mine Resistant Ambush Protected (MRAP) vehicle, the interrogation arm assembly and the Zeus IIA Directed Energy Weapon (DEW) system. The MRAP vehicles are not procured under this budget line. Within RDR, this budget line specifically funds Aluminum Mat-2 (AM-2) matting kits, Fiber Reinforced Polymer (FRP) matting kits, and Water and Fuels Expedient Repair System (WaFERS) kits. AM-2 matting kits may be used as a capping material for repairs or as an expedient expansion method on airfield aprons and low-speed taxiways. FRP matting kits may be used as a capping material for repairs may be used in a variety of airfield locations depending on aircraft type, and operations. WaFERS kits may be used as an expedient repair or recovery of mission essential water and fuel distribution systems and associated infrastructure. Tactical communication packages include a variety of systems, equipment, and accessories to provide Command, Control, and Communication (C3) for the Civil Engineer enterprise. This budget line also funds the procurement of capabilities required to bring six Combat Support Training Range (CSTR) locations to Full Operational Capability (FOC), critical to the Air Force's ability to increase and maintain the readiness of Air Expeditionary Wings (AEWs) to build a ready, lethal, and resilient fighting force. As governed by the forthcoming Air Expeditionary Wing TASKORD, the CSTR locations will enable the Air Force's Agile Combat Employment (ACE) scheme of maneuver by providing locations to conduct realistic and high-end training for Combat Support and Combat Service Support Airmen to increase the resiliency and survivability of Air Force power projection platforms in conflict against a peer and near-peer adversaries. The CSTR sites will give commanders the ability to conduct rigorous fieldcraft skills and combat training, ensuring Airmen will be able to execute their mission in a contested environment, while also developing Multi-Capable Airman (MCA) skills outside their core specialties to create increased survivability, redundancy, and flexibility. Maximizing realistic repetitions in training is critical to harnessing a warrior ethos in our Airmen and ensuring lethality and survivability for AEWs in a high-end fight. The CSTR sites will further provide the capability to train Combat Enhancement Teams (CETs) and Combat Generation Teams (CGTs), critical to the success of the AEW 2.0 force presentation model. These specialized teams provide specific capabilities to or increase scope and/or scale of an AEW, to ensure seamless AEW operations and power projection. Within CSTR, this budget line specifically funds non-vehicle equipment packages that enable realistic training of IBBR capabilities at the 6 sites, including EOD, CBRN, RADR, and Tactical Communication functions. Funding for this exhibit contained in PEs: 0204424F, 0207430F, 0207574F, 0207593F, 0207588F, and 0208028F. LI 845100 - Engineering and EOD Equipment Air Force UNCLASSIFIED Page 2 of 12 P-1 Line #58 Volume 1 - 698 === page 735 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 845100 / Engineering and EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 5: Base Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Engineering and EOD Equipment P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 203.531 - / 258.799 - / 247.989 - / - - / 247.989 - / - - / 203.531 - / 258.799 - / 247.989 - / - - / 247.989 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: This budget line has a net decrease compared to previous years. Within the budget line, the Combat Support Training Range program has received significant increases intended to support CSTR at full operational capability and procure critical combat support equipment required to train, certify, and employ mission ready units. The CSTR locations will enable the Air Force's Agile Combat Employment (ACE) scheme of maneuver by providing locations to conduct realistic and high-end training for Combat Support and Combat Service Support Airmen to increase the resiliency and survivability of Air Force power projection platforms in conflict against a peer and near-peer adversaries. The capabilities included in this portfolio enable maximizing realistic repetitions in training, which are critical to ensuring lethality and survivability for AEWs in a high-end fight. The Set the Theater program has decreased compared to previous years, but funding is still intended to support Set the Theater objectives in USINDOPACOM, due to the role of IBRR and Air Base Resiliency in operationalizing the Agile Combat Employment (ACE) concept in the Indo-Pacific. ACE is a proactive and reactive scheme of maneuver that shifts generation of airpower from large, fixed centralized bases, to networks of smaller dispersed bases. The capabilities provided within this budget line are part of the DAF's cost-effective mix of targeted investments designed to enable the distributed resilient basing needed to deter our adversaries and prevail in combat. Updates have been made to planned procurements across the program to align resources with the latest strategic guidance FY27 Funding of 3.927M in PEC 0204424F will procure EOD capabilities, including but not limited to Counter-Chemical/Explosive Improvised Weapon Transport, Point Target CREW System, Unmanned Systems (Small, Medium, and Large), Remote Firing Systems, Ordnance Locator Systems, Adaptive Basing Kits, and C4I Systems. FY27 Funding of 10.339M in PEC 0207430F will procure RED HORSE capabilities, including but not limited to Ultimate Building Machine (UBM) Packages, Beddown Equipment, and non-vehicle UTC equipment packages. FY27 Funding of 4.587M in PEC 0207593F will procure CBRN capabilities, including but not limited to Radiological Detection Family of Systems. FY27 Funding of 104.156M in PEC 0208028F will procure expeditionary engineering capabilities including but not limited to Rapid Damage Assessment systems, Rapid Explosive Hazard Mitigation Family of Systems, Aluminum Matting Kits, Fiber Reinforced Polymer Kits, Water and Fuels Expedient Repair System Kits, Tactical Communication Packages, and Expeditionary Airfield Lighting Systems (EAL-C). FY27 Funding of 4.376M in PEC 0207574F will procure Emergency Management Equipment in support of Full Operational Capability of 6 Combat Support Training Range sites, including but not limited to Sample Collection Equipment packages. FY27 Funding of 11.250M in PEC 0207588F will procure Protection equipment in support of Full Operational Capability of 6 Combat Support Training Range sites, including but not limited to JCREW equipment and Tactical Communication packages. LI 845100 - Engineering and EOD Equipment Air Force UNCLASSIFIED Page 3 of 12 P-1 Line #58 Volume 1 - 699 === page 736 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 5: Base Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 845100 / Engineering and EOD Equipment Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A FY27 Funding of 0.100M in PEC 0204424F will procure EOD equipment in support of Full Operational Capability of 6 Combat Support Training Range sites, including but not limited to First Found Ordnance packages. FY27 Funding of 25.000M in PEC 0208028F will procure Expeditionary Engineering equipment in support of Full Operational Capability of 6 Combat Support Training Range sites, including but not limited to AM2 kits, Firefighting communication packages, Fiber Reinforced Panel kits, Rapid Airfield Damage Assessment Systems, and Water and Fuels Expedient Repair System Kits. FY27 Funding of 89.100M in PEC 0208028F will procure equipment to Set the Theater in support of the Pacific Deterrence Initiative, including but not limited to Expedient Small Asset Protection (ESAP) Shelters, Fiber Reinforced Polymer (FRP) Kits, Hasty Aircraft Inflatable Large Shelters, and other infrastructure hardening assets. PMC OTHER GOVERNMENT COSTS: This line supports the operation of the program office in its management and oversight role via travel, studies, shipping costs, and procurement of supplies. **DISCLAIMER: Based on AF mission changes and/or AF mission priorities, NSNs and/or quantities may change during year of execution. Unit costs are also subject to change based on fluctuation in contract pricing. LI 845100 - Engineering and EOD Equipment Air Force UNCLASSIFIED Page 4 of 12 P-1 Line #58 Volume 1 - 700 === page 737 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 845100 / Engineering and EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Engineering and EOD Equipment MDAP/MAIS Code: Resource Summary Prior Years FY 2025 Procurement Quantity (Units in Each) - Gross/Weapon System Cost ($ in Millions) - Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) - Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) - FY 2026 - FY 2027 Base FY 2027 OOC - - - 203.531 258.799 - 247.989 - 203.531 - - - - 258.799 247.989 - 247.989 - 203.531 - - - 258.799 FY 2027 Total 247.989 - 247.989 - - 247.989 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Logistics - Engineering and EOD Equipment Cost Recurring Cost EOD - Counter Remote Controlled Improvised Explosive Device (RCIED) Electronic Warfare (CREW) System - - - - - - - - - 0.051 18 0.918 - - - 0.051 18 0.918 EOD - Unmanned Systems (Render Safe/Disrupt) - - - - - - - - - 0.178 8 1.424 - - - 0.178 8 1.424 EOD - Unmanned Systems (Reconnaisance) - - - 0.045 40 1.800 0.050 40 2.000 - - - - - - - - - EOD - Remote Firing Systems - - - 0.001 1,000 1.000 0.002 1,000 2.000 0.002 500 1.000 - - - 0.002 500 1.000 EOD - Ordnance Locator Systems - - - 0.026 120 3.120 0.030 120 3.600 - - 0.000 - - - - - 0.000 EOD - Night Vision Devices - - - 0.011 581 6.391 0.011 581 6.391 0.011 45 0.495 - - - 0.011 45 0.495 - - - 0.702 10 7.020 0.800 9 7.200 0.802 10 8.020 - - - 0.802 10 8.020 - - - - - - - - 0.200 30 6.000 - - - 0.200 30 6.000 RADR - Rapid Damage Assessment (†) (RDA) RADR - REHM Directed Energy Systems (RADBO Zeus Laser Maintenance) LI 845100 - Engineering and EOD Equipment Air Force - UNCLASSIFIED Page 5 of 12 P-1 Line #58 Volume 1 - 701 === page 738 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 845100 / Engineering and EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Engineering and EOD Equipment MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements RADR - Aluminum Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) (†) - - - 2.195 12 26.340 2.200 18 39.600 2.207 12 26.484 - - - 2.207 12 26.484 RADR - Fiber Reinforced Polymer - - - 0.665 16 10.640 0.680 68 46.240 0.682 48 32.736 - - - 0.682 48 32.736 - - - 2.165 3 6.495 2.201 6 13.206 2.208 7 15.456 - - - 2.208 7 15.456 CBRN - Radiological Detection Family of Systems (FoS) - - - 0.011 626 6.886 0.011 417 4.587 0.011 417 4.587 - - - 0.011 417 4.587 Expedient Small Asset Protection (ESAP) Shelters - - - 7.491 16 119.856 6.187 17 105.179 - - - - - - - - - - - - - - - - - - 6.229 14 87.206 - - - 6.229 14 87.206 Tactical Communication Packages - - - 0.043 100 4.300 0.050 100 5.000 0.050 37 1.850 - - - 0.050 37 1.850 Expeditionary Airfield Lighting Systems (EAL-C) - - - 2.300 2 4.600 2.300 4 9.200 2.307 3 6.921 - - - 2.307 3 6.921 RED HORSE Ultimate Building Machine (UBM) Package - - - - - - - - - 1.100 4 4.400 - - - 1.100 4 4.400 RED HORSE Beddown Equipment - - - - - - - - - 0.124 74 9.176 - - - 0.124 74 9.176 CSTR - Emergency Management Equipment - - - - - - - - - 0.729 6 4.374 - - - 0.729 6 4.374 CSTR - EOD Equipment - - - - - - - - - 0.017 6 0.102 - - - 0.017 6 0.102 CSTR - Expeditionary Engineering Equipment - - - - - - - - - 4.027 6 24.162 - - - 4.027 6 24.162 CSTR - Protection Equipment - - - - - - - - - 1.875 6 11.250 - - - 1.875 6 11.250 EOD - C4I Systems (bought out FY26) - - - 0.009 375 3.375 0.011 375 4.125 - - - - - - Matting (AM2) Kit (FRP) Kit (†) RADR - Water and Fuels Expedient Repair System (†) (WaFERS) Kit ESAP Type II (†) Shelters LI 845100 - Engineering and EOD Equipment Air Force UNCLASSIFIED Page 6 of 12 - P-1 Line #58 - - Volume 1 - 702 === page 739 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 845100 / Engineering and EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Engineering and EOD Equipment MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) EOD - Adaptive Basing Kits (bought out FY26) - - - 0.850 Extendable Panelized and Collapsible Shelter (E-PACS) - - - - PSC Program Support Costs - - - 0.008 Subtotal: Recurring Cost FY 2026 Total Cost Qty (Each) Unit Cost ($ M) 2 1 ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) 1.700 0.850 6 5.100 - - - - - - - - - - 0.150 33 4.950 - - - - - - - - - 0.008 0.421 1 0.421 1.428 1.428 - - - 1.428 1 1 1.428 - - - - - 203.531 - - 258.799 - - 247.989 - - - - - 247.989 Subtotal: Logistics Engineering and EOD Equipment Cost - - - - - 203.531 - - 258.799 - - 247.989 - - - - - 247.989 Gross/Weapon System Cost - - - - - 203.531 - - 258.799 - - 247.989 - - - - - 247.989 (†) indicates the presence of a P-5a LI 845100 - Engineering and EOD Equipment Air Force UNCLASSIFIED Page 7 of 12 P-1 Line #58 Volume 1 - 703 === page 740 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 O O C Cost Elements RADR - Rapid Damage (†) Assessment (RDA) RADR - Rapid Damage (†) Assessment (RDA) RADR - Rapid Damage (†) Assessment (RDA) RADR - Aluminum Matting (AM2) Kit (†) RADR - Aluminum Matting (AM2) Kit (†) RADR - Aluminum Matting (AM2) Kit (†) RADR - Fiber Reinforced Polymer (FRP) Kit (†) RADR - Fiber Reinforced Polymer (FRP) Kit (†) RADR - Fiber Reinforced Polymer (FRP) Kit (†) RADR - Water and Fuels Expedient (†) Repair System (WaFERS) Kit RADR - Water and Fuels Expedient (†) Repair System (WaFERS) Kit RADR - Water and Fuels Expedient (†) Repair System (WaFERS) Kit (†) ESAP Type II Shelters (†) P-1 Line Item Number / Title: 845100 / Engineering and EOD Equipment Item Number / Title [DODIC]: Engineering and EOD Equipment FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) 2025 TBD / TBD C / FFP AFCEC Jul 2025 Oct 2025 10 0.702 Y 2026 TBD / TBD C / FFP AFCEC Jul 2026 Oct 2026 9 0.800 Y 2027 TBD / TBD C / FFP AFCEC Jul 2027 Oct 2027 10 0.802 Y 2025 ALFAB / Enterprise, AL MIPR AFCEC Jul 2025 Mar 2026 12 2.195 Y 2026 ALFAB / Enterprise, AL MIPR AFCEC Jul 2026 Mar 2027 18 2.200 Y 2027 ALFAB / Enterprise, AL MIPR AFCEC Jul 2027 Mar 2028 12 2.207 Y 2025 AMS Industries, LLC. / Charlotte, NC C / IDIQ AFCEC Jun 2025 May 2026 16 0.665 Y 2026 AMS Industries, LLC. / Charlotte, NC C / IDIQ AFCEC Jun 2026 May 2027 68 0.680 Y 2027 AMS Industries, LLC. / Charlotte, NC C / IDIQ AFCEC Jun 2027 May 2028 48 0.682 Y 2025 Atlantic Diving Supply INC / Virginia Beach, VA C / BPA AFLCMC/WN - Agile Combat Systems Jul 2025 May 2026 3 2.165 Y 2026 Atlantic Diving Supply INC / Virginia Beach, VA C / BPA AFLCMC/WN - Agile Combat Systems Jul 2026 May 2027 6 2.201 Y 2027 Atlantic Diving Supply INC / Virginia Beach, VA C / BPA AFLCMC/WN - Agile Combat Systems Jul 2027 May 2028 7 2.208 Y 2027 Dogwood Industries, LLC / Woodinville, WA SS / BPA AFLCMC/WN - Agile Combat Systems Jul 2027 Jul 2028 14 6.229 Y Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 845100 - Engineering and EOD Equipment Air Force UNCLASSIFIED Page 8 of 12 P-1 Line #58 Volume 1 - 704 === page 741 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 845100 / Engineering and EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Engineering and EOD Equipment Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P RADR - Rapid Damage Assessment (RDA) 1 2025 AF 10 0 10 1 2026 AF 9 0 9 1 2027 AF 10 0 10 A - - - 1 1 1 1 1 1 1 1 1 1 0 A - - - 9 10 RADR - Aluminum Matting (AM2) Kit 2 2025 AF 12 0 12 2 2026 AF 18 0 18 2 2027 AF 12 0 12 A - - - - - - - - 2 2 2 2 2 1 A - 1 - - 0 18 12 RADR - Fiber Reinforced Polymer (FRP) Kit 3 2025 AF 16 0 16 3 2026 AF 68 0 68 3 2027 AF 48 0 48 A - - - - - - - - - - - 4 4 4 A - 4 - 0 - - 68 48 RADR - Water and Fuels Expedient Repair System (WaFERS) Kit 4 2025 AF 3 0 3 4 2026 AF 6 0 6 4 2027 AF 7 0 7 14 0 14 A - - - - - - - - - - 1 1 1 0 A - - - 6 7 ESAP Type II Shelters 5 2027 AF 14 O C T N O V LI 845100 - Engineering and EOD Equipment Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #58 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 705 === page 742 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 845100 / Engineering and EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Engineering and EOD Equipment Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P RADR - Rapid Damage Assessment (RDA) 1 2025 AF 10 10 0 1 2026 AF 9 0 9 1 2027 AF 10 0 10 0 1 1 1 1 1 1 1 1 1 0 A - - - 1 1 1 2 1 1 1 1 1 1 1 1 1 0 RADR - Aluminum Matting (AM2) Kit 2 2025 AF 12 12 0 2 2026 AF 18 0 18 2 2027 AF 12 0 12 0 - - - - - 2 2 2 2 2 2 A - 2 - - - - 0 - - - 2 2 6 4 2 2 1 1 1 1 RADR - Fiber Reinforced Polymer (FRP) Kit 3 2025 AF 16 16 0 3 2026 AF 68 0 68 3 2027 AF 48 0 48 0 - - - - - - - 4 6 6 A - 6 - 6 - 6 - 6 - 6 - 6 - 6 - - - 0 - 4 6 6 6 6 20 RADR - Water and Fuels Expedient Repair System (WaFERS) Kit 4 2025 AF 3 3 0 4 2026 AF 6 0 6 4 2027 AF 7 0 7 14 0 14 0 - - - - - - - 1 1 1 1 A - 1 - 1 - 0 - - - - - - - 1 1 1 1 1 2 2 8 ESAP Type II Shelters 5 2027 AF A O C T N O V LI 845100 - Engineering and EOD Equipment Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #58 M A R A P R M A Y J U N 2 J U L 2 A U G S E P Volume 1 - 706 === page 743 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 845100 / Engineering and EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Engineering and EOD Equipment Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E RADR - Rapid Damage Assessment (RDA) 1 2025 AF 10 10 0 0 1 2026 AF 9 9 0 0 1 2027 AF 10 10 0 0 0 RADR - Aluminum Matting (AM2) Kit 2 2025 AF 12 12 0 2 2026 AF 18 18 0 2 2027 AF 12 11 1 0 1 0 RADR - Fiber Reinforced Polymer (FRP) Kit 3 2025 AF 16 16 0 3 2026 AF 68 68 0 3 2027 AF 48 28 20 0 0 4 4 4 4 4 0 RADR - Water and Fuels Expedient Repair System (WaFERS) Kit 4 2025 AF 3 3 0 4 2026 AF 6 6 0 4 2027 AF 7 5 2 14 6 8 0 0 1 1 0 ESAP Type II Shelters 5 2027 AF 2 O C T 2 N O V LI 845100 - Engineering and EOD Equipment Air Force 2 D E C 1 J A N 1 F E B 0 M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #58 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 707 === page 744 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 845100 / Engineering and EOD Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: Engineering and EOD Equipment Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 1 TBD - TBD 1 2 100 0 0 0 0 1 10 3 13 2 ALFAB - Enterprise, AL 4 16 48 0 0 0 0 1 10 8 18 3 AMS Industries, LLC. Charlotte, NC 4 48 72 0 0 0 0 1 9 11 20 4 Atlantic Diving Supply INC Virginia Beach, VA 2 12 20 0 0 0 0 1 10 10 20 5 Dogwood Industries, LLC Woodinville, WA 6 18 24 0 0 0 0 1 10 12 22 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 845100 - Engineering and EOD Equipment Air Force UNCLASSIFIED Page 12 of 12 P-1 Line #58 Volume 1 - 708 === page 745 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 845420 / Mobility Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 5: Base Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) - Gross/Weapon System Cost ($ in Millions) - Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) - Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) - FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 115.880 115.880 115.880 126.200 126.200 126.200 288.930 - - 288.930 - - 288.930 - 288.930 288.930 288.930 428.713 428.713 428.713 515.980 515.980 515.980 651.318 651.318 651.318 To FY 2031 Complete 393.825 393.825 393.825 Total - 2,520.846 - 2,520.846 - 2,520.846 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The Mobility Equipment program is a critical component of the National Defense Strategy, essential for executing Geographic Combatant Commanders' Operational Plans (OPLANs) worldwide and supports beddown of deployed forces (personnel, aircraft, and support equipment). Funding will procure Expeditionary Airfield Basing prepositioned stocks, enabling rapid response to contingencies and sustained wartime operations, vital for projecting airpower, deterrence, and maintaining global presence. The FY 2026 spend plan total of $126,200 thousand of discretionary and $41,000 thousand mandatory (reconciliation) for a total of $167,200 thousand. Mandatory funds spend plan includes procurement of Airfield Lighting with MALSR (3 total) and Air Rapid Response Kits (14 A1s, 14 A3s, 16 A4s, and 16 A5s). This equipment is part of the Air Force's prepositioned war reserve materiel (PWRM) and will be managed in accordance with 10 U.S.C. Sec 2229, Strategic Policy on Prepositioning of Materiel and Equipment. Expeditionary Airfield Basing is composed of multiple air base capability packages or unit type codes (UTCs) to include feeding, hygiene, water purification, power production, airfield & base lighting, shelters, mobile aircraft arresting systems, and environmental support equipment. This program provides personnel and flightline support at forward operating sites (Establish the Base, Operate the Base). The program provides funding to procure new and replacement equipment items, and multimedia packages required to support BEAR training facilities at Silver Flag Sites, Regional Training Sites, Technical Schools, Technical Certification Centers, Services Combat Center Training, the 635th Materiel Maintenance Group, and Eagle Flag. Costs include inventory reconstitution, spares and consumables, repairs, and procurement of new equipment for upgrades or full UTC replacements. Air Rapid Response Kits (ARRK): The ARRK packages are turnkey, self-supporting deployable force support packages that can be quickly deployed or pre-positioned in remote, austere locations for use as Expeditionary Forward Operating Bases. The contents of the ARRK kits are all hand-transportable and can be positioned, erected, recovered, and stored without the use of any Material Handling Equipment or specialty tools. The entire J1 package is a self-supporting, turnkey 100-person bed-down UTC. The J2 package is Self-supporting Command and Control (C2) suite. The J3 - HVAC (Heating, Ventilation, and Air Conditioning) Support kit provides the J1 100-Person Beddown kit with HVAC assets while simultaneously providing power redundancy in the event of enemy attack, natural disaster and/or unforeseen asset inoperability. The J4 Fuel Support Kit provides extended operability of ARRK kit fuel consuming equipment including generators and shower/shave water heaters. The J5 - Water Purification Package is a selfcontained, desalination Water purification unit. Environmental - HVAC: Heat Pump to provide cooling, heating via reversing valve (heat pump) and supplemental heat via resistance heat strips. Heating, Ventilating, and Air Conditioning (HVAC) provides thermal comfort and acceptable indoor air quality. LI 845420 - Mobility Equipment Air Force UNCLASSIFIED Page 1 of 22 P-1 Line #59 Volume 1 - 709 === page 746 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 845420 / Mobility Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 5: Base Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Lighting: Expeditionary Airfield Lighting System (EALS) is a light emitting diode (LED) and incandescent runway lighting system designed to be rapidly installed at contingency airfields and at other locations that need temporary airfield lighting. The lighting kit for runways includes runway edge and threshold lights, precision approach path indicator (PAPI), and strobe approach lights, distance to go marker lamps, taxi way lamps and battery-operated obstruction lights. The EALS also includes the generators, cables, control cables, transformers and regulators. The entire system is packaged on six (6) mobile trailers. System will be replaced with a Next Generation System in future years. Lighting also includes base lighting through the Remote Area Lighting System (RALS), a self-contained, skid mounted, fully enclosed transportable lighting system. Hygiene: Hygiene includes Shower, Shave and Latrine, WH-400 water heaters for initial Hygiene fielding and Self-Help Laundry system which provides personal hygiene facilities. Feeding: Includes kitchen and all applicable equipment. The feeding system provides the capability to prepare, and then serve, 500 meals over a two-hour serving period, twice per day (24-hour period). The Feeding system is worldwide deployable and supports numerous basing options. This system supports initial mission requirements and follow-on high mobility feeding requirements for rapidly deployable mobility packages and other contingencies in all theaters of operation. Mobile Aircraft Arresting System (MAAS): The air transportable barrier arresting kit (BAK-12) mounted on a mobile trailer accommodates the recovery of fighter aircraft returning to battle damaged airfield. It is capable of arresting specified aircraft within a nominal 1,200 feet runout. The system is capable of being installed in soil, asphalt, or concrete and is used in non-permanent contingency situations. Mobile Runway Edge Sheaves (MRES): Designed to enhance capabilities of the MAAS by providing a low-profile runway edge sheave and is used in non-permanent contingency situations. Power Production: Consists of prime and secondary power equipment, such as Cable Reel Pallet Assemblies (CRPAs), providing the capability to generate and distribute power to billeting, feeding, flight line and industrial operations at forward deployed sites. The primary power source for bed-down locations is the Basic Expeditionary Airfield Resource (BEAR) Power Unit (BPU). The BPU is an 800 kilowatt (kW) Tier II compliant diesel generator. The power from the BPU is distributed through buried high voltage cabling and stepped down to facility power through the Secondary Distribution Center (SDC). The SDC is a 150 kilovolt-ampere (KVA) transformer capable of supporting twelve (12) billeting shelters via the Primary Distribution Panels (PDP). Shelters: Shelters vary in sizes and are needed for billeting, kitchen, hygiene, and aircraft and equipment maintenance. Includes lighting, electrical equipment, environmental control units, remote area lighting, shelter flies, flooring/matting for various shelter sizes, and shelter liners. 4K and 8K Domes (5000-8000 sq. ft. interiors) are designed for various uses, including maintenance space, general purpose and storage, training space, and are completely mobile/relocatable, deployable on any ground type. Water Production: Force Module Water System converts non-potable water into potable water. The system is modular and scalable in design and consists of Source Run, Water Production, Reverse Osmosis Water Purification Unit (ROWPU), Initial, Follow-on, and Industrial Operations, Flight line Extension, freeze protection, grey water recovery, pumping, piping, storage equipment, applicable fittings, and other components such as fluid control valves. Training/Multi-Media Training - Provides items for all Expeditionary Airfield Basing training sites and funds for all required multi-media training requirements. This requirement (or modification) supports performance of a full financial audit as required by 10 U.S.C. Chapter 9A, Sec 240-D. Funding for this exhibit is contained in Program Element 0401135F Expeditionary Airfield Basing Assets. LI 845420 - Mobility Equipment Air Force UNCLASSIFIED Page 2 of 22 P-1 Line #59 Volume 1 - 710 === page 747 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 845420 / Mobility Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 5: Base Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Mobility Equipment P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 115.880 - / 126.200 - / 288.930 - / - - / 288.930 - / - - / 115.880 - / 126.200 - / 288.930 - / - - / 288.930 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 total of $288,930 thousand for the procurement of Expeditionary Airfield Basing Assets; this includes an increase of $153,470 thousand to procure prepositioned airfield basing assets in direct support of increasing readiness, and posturing and sustaining a strong denial defense in the Indo-Pacific in alignment with the Agile Combat Employment concept and the National Defense Strategy. Items budgeted within this program include (but are not limited to) airfield lighting, bed-down kits, HVAC, power production, mobile aircraft arresting systems, personnel and maintenance shelters, and water production and storage. FY 2027 includes $135,460 thousand is for global prepositioning requirements to include increases for Homeland Defense and includes an increase of $12,888 thousand for a Defense Logistics Agency supply rate change. The FY 2026 spend plan total of $126,200 thousand of discretionary (including PDI $7,168) and $41,000 thousand mandatory (reconciliation) for a total of $167,200 thousand. Planned quantities could change due to price increases, inflation, and supply chain fluctuations. Mobility Equipment prepositioned stocks significantly impact Contested Logistics and provides a cost-effective mix of investments that operationalizes the Agile Combat Employment (ACE) concept (AFDN 1-21) in the Indo-Pacific. ACE is a proactive and reactive scheme of maneuver that shifts generation of airpower from large, fixed, centralized bases, to networks of smaller, dispersed bases. The Air Force continues to modernize major Expeditionary Airfield Basing Assets to replace obsolete and inefficient models (e.g., Power Generation, Hygiene, Refrigeration, Airfield Lighting, Mobile Aircraft Arresting Systems, Shelters, and Feeding). This program performs a critical role in the combatant commander's requirements to support 5 major Operations Plans (OPLANs) and ensures the 2026 National Defense Strategy objectives and lines of effort can be executed. The Mobility Equipment program adheres to: 10 U.S.C. 2229: Strategic policy on prepositioning of materiel and equipment. Chairmen of the Joint Chiefs of Staff Instruction (CJSCI) 4310.01F: Prepositioned capabilities, ashore and afloat, place military equipment and supplies at or near the point of planned use to ensure timely support of Expeditionary Air Forces and other specific forces during the initial phases of an operation. These assets provide combatant commanders with initial capabilities and materiel until establishment of a mature and sustained Strategic/Theater Distribution Network. LI 845420 - Mobility Equipment Air Force UNCLASSIFIED Page 3 of 22 P-1 Line #59 Volume 1 - 711 === page 748 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 845420 / Mobility Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Mobility Equipment MDAP/MAIS Code: Resource Summary Prior Years FY 2025 Procurement Quantity (Units in Each) - Gross/Weapon System Cost ($ in Millions) - Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) - Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) - FY 2026 - FY 2027 Base FY 2027 OOC - - - 115.880 126.200 - 288.930 - 115.880 - - - - 126.200 288.930 - 288.930 - 115.880 - - - 126.200 FY 2027 Total 288.930 - 288.930 - - 288.930 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Mobility Equipment Cost Recurring Cost BASE LIGHTING - REMOTE AREA (†) LIGHTING BEAR High Power (†) (BPU) AIRFIELD LIGHTING (†) With MALSR HYGIENE (†) WATER PRODUCTION- (†) SOURCE RUN MOBILE AIRCRAFT ARRESTING (†) SYSTEM POWER PRODUCTIONMEDIUM POWER GENERATORS - - - 0.053 12 0.636 0.048 8 0.384 0.049 8 0.392 - - - 0.049 8 0.392 - - - 1.039 27 28.053 1.081 13 14.053 1.208 16 19.328 - - - 1.208 16 19.328 - - - 2.354 18 42.372 2.897 3 8.691 2.969 2 5.938 - - - 2.969 2 5.938 - - - 0.465 5 2.325 0.587 12 7.044 0.587 13 7.631 - - - 0.587 13 7.631 - - - 0.630 2 1.260 0.673 6 4.038 0.689 7 4.823 - - - 0.689 7 4.823 - - - - - - 1.104 8 8.832 1.131 55 62.205 - - - 1.131 55 62.205 - - - 0.055 88 4.840 - - - 0.059 144 8.496 - - - 0.059 144 8.496 - - - 0.020 372 7.440 0.020 264 5.280 0.021 72 1.512 - - - 0.021 72 1.512 - - - 0.022 420 9.240 0.022 656 14.432 0.023 162 3.726 - - - 0.023 162 3.726 (†) 60Kw SHELTERS ESSS (†) ENVIRONMENTAL(†) HVAC UNITS LI 845420 - Mobility Equipment Air Force UNCLASSIFIED Page 4 of 22 P-1 Line #59 Volume 1 - 712 === page 749 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 845420 / Mobility Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Mobility Equipment MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements (†) Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) ARRK A1 Kit - - - - - - 1.066 9 9.594 1.093 29 31.697 - - - 1.093 29 31.697 POWER PRODUCTION - PDP - - - 0.004 48 0.192 0.004 34 0.136 0.004 30 0.120 - - - 0.004 30 0.120 - - - 0.187 17 3.179 0.194 4 0.776 0.199 10 1.990 - - - 0.199 10 1.990 - - - 0.065 9 0.585 0.068 21 1.428 0.070 10 0.700 - - - 0.070 10 0.700 - - - 0.432 2 0.864 0.428 4 1.712 - - - - - - - - - - - - 0.274 3 0.822 - - 0.284 38 10.792 - - - 0.284 38 10.792 - - - 0.853 2 1.706 0.851 4 3.404 0.873 8 6.984 - - - 0.873 8 6.984 - - - 0.450 2 0.900 0.471 2 0.942 0.483 6 2.898 - - - 0.483 6 2.898 - - - 0.027 34 0.918 0.029 35 1.015 0.029 30 0.870 - - - 0.029 30 0.870 - - - 0.014 68 0.952 0.015 63 0.945 0.015 165 2.475 - - - 0.015 165 2.475 - - - - - - 0.275 5 1.375 0.314 15 4.710 - - - 0.314 15 4.710 - - - 0.399 3 1.197 - - - - - - - - - - - - - - - 0.008 273 2.184 - - - 0.008 40 0.320 - - - 0.008 40 0.320 (†) UNITS POWER PRODUCTION CABLE REEL PALLET (†) ASSEMBLIES POWER PRODUCTION DISTRIBUTION (†) BOX 8K DOME MAINTENANCE SHELTERS (†) MOBILE RUNWAY EDGE SHEAVES (†) WATER PRODUCTION - SUPPLY DISTRIBUTION - (†) SYSTEM WATER PRODUCTION WATER FOLLOW-ON (†) SYSTEM FLIGHTLINE LIGHTING - TF-2 LIGHT CARTS (†) GENERATOR WHEEL (†) KITS LARGER AREA MAINTENANCE SHELTERS (†) REVERSE OSMOSIS WATER PURIFICATION UNITS ENVIRONMENTAL HEATER UNITS (†) LI 845420 - Mobility Equipment Air Force UNCLASSIFIED Page 5 of 22 P-1 Line #59 Volume 1 - 713 === page 750 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 845420 / Mobility Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Mobility Equipment MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ M) LAUNDRY FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) - - - 0.072 14 1.008 0.090 2 0.180 0.092 4 0.368 - - - 0.092 4 0.368 - - - 0.262 1 0.262 0.273 4 1.092 0.277 14 3.878 - - - 0.277 14 3.878 MEDIUM SHELTERS - - - 0.085 16 1.360 - - - - - - - - - - - - (†) - - - 0.003 164 0.492 0.004 50 0.200 0.004 54 0.216 - - - 0.004 54 0.216 - - - 0.127 7 0.889 0.180 9 1.620 0.185 10 1.850 - - - 0.185 10 1.850 - - - - - - 0.048 6 0.288 0.050 24 1.200 - - - 0.050 24 1.200 - - - - - - 2.221 8 17.768 2.276 17 38.692 - - - 2.276 17 38.692 (†) - - - - - - 1.200 2 2.400 1.230 13 15.990 - - - 1.230 13 15.990 (†) - - - - - - 0.851 9 7.659 0.873 32 27.936 - - - 0.873 32 27.936 (†) - - - - - - 0.207 9 1.863 0.206 38 7.828 - - - 0.206 38 7.828 (†) - - - - - - 0.271 9 2.439 0.278 40 11.120 - - - 0.278 40 11.120 Subtotal: Recurring Cost - - - - - 113.676 - - 119.590 - - 286.685 - - - - - 286.685 Subtotal: Hardware - Mobility Equipment Cost - - - - - 113.676 - - 119.590 - - 286.685 - - - - - 286.685 PMA-OTHER GOVERNMENT COSTS - - - - - - - - - - - - PMA-CONTRACTOR SERVICES - - - 1.254 SYSTEMS (†) WATER PRODUCTION PUMPING UNITS PDP 30Kw (†) POWER PRODUCTION SWITCHING UNITS (†) POWER PRODUCTION MEDIUM GENS (†) 30Kw AIRFIELD LIGHTING WITHOUT MALSR (†) ARRK A2 Kit ARRK A3 Kit ARRK A4 Kit ARRK A5 Kit Support - Mobility Equipment Cost - 4.630 1 4.630 - - 1 1.254 1.320 1 1.320 1.430 1 1.430 - - - 1.430 1 1.430 TRANSPORTATION - - - 0.005 190 0.950 0.005 132 0.660 0.005 163 0.815 - - - 0.005 163 0.815 Subtotal: Support - Mobility Equipment Cost - - - - - 2.204 - - 6.610 - - 2.245 - - - - - 2.245 Gross/Weapon System Cost - - - - - 115.880 - - 126.200 - - 288.930 - - - - - 288.930 Remarks: Unit Costs for FY 2027 are assumed and subject to change. PMA Other Contractor Services: This funding includes provisions for government contract oversight, technical expertise, and BEAR program support. LI 845420 - Mobility Equipment Air Force UNCLASSIFIED Page 6 of 22 P-1 Line #59 Volume 1 - 714 === page 751 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 P-1 Line Item Number / Title: 845420 / Mobility Equipment ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Mobility Equipment MDAP/MAIS Code: TRANSPORTATION: Includes cost to ship equipment from vendor to destination point. Requirements are subject to change based on shifts in Air Force priorities, operational requirements in the year of execution, contracts, and supply chain fluctuations. (†) indicates the presence of a P-5a LI 845420 - Mobility Equipment Air Force UNCLASSIFIED Page 7 of 22 P-1 Line #59 Volume 1 - 715 === page 752 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 O O C Cost Elements BASE LIGHTING - REMOTE AREA LIGHTING (†) BASE LIGHTING - REMOTE AREA LIGHTING (†) BASE LIGHTING - REMOTE AREA LIGHTING (†) BEAR High Power (BPU) (†) BEAR High Power (BPU) (†) BEAR High Power (BPU) (†) AIRFIELD LIGHTING With MALSR (†) AIRFIELD LIGHTING With MALSR (†) AIRFIELD LIGHTING With MALSR (†) HYGIENE (†) HYGIENE (†) HYGIENE (†) WATER PRODUCTION- SOURCE RUN (†) WATER PRODUCTION- SOURCE RUN (†) WATER PRODUCTION- SOURCE RUN (†) MOBILE AIRCRAFT ARRESTING SYSTEM (†) MOBILE AIRCRAFT ARRESTING SYSTEM (†) POWER PRODUCTION-MEDIUM (†) POWER GENERATORS 60Kw LI 845420 - Mobility Equipment Air Force P-1 Line Item Number / Title: 845420 / Mobility Equipment Item Number / Title [DODIC]: Mobility Equipment FY Contractor and Location Method/Type or Funding Vehicle 2025 GSA / Virginia C / BPA AFLCMC/WN - Agile Combat Systems Nov 2024 Feb 2025 12 0.053 Y 2026 GSA / Virginia C / BPA AFLCMC/WN - Agile Combat Systems Jan 2026 Jan 2026 8 0.048 Y 2027 GSA / Virginia C / BPA AFLCMC/WN - Agile Combat Systems Oct 2026 Dec 2026 8 0.049 Y 2025 Cummins / Wisconsin TBD AFLCMC/WN - Agile Combat Systems Dec 2024 Mar 2025 27 1.039 Y 2026 Cummins / Wisconsin MIPR AFLCMC/WN - Agile Combat Systems Jan 2026 Feb 2026 13 1.081 Y 2027 Cummins / Wisconsin MIPR AFLCMC/WN - Agile Combat Systems Oct 2026 Dec 2026 16 1.208 Y 2025 GSA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Jan 2025 Jul 2025 18 2.354 Y 2026 GSA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Sep 2025 Jan 2026 3 2.897 Y 2027 GSA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Jan 2027 Apr 2027 2 2.969 Y 2025 GSA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Oct 2024 Dec 2024 5 0.465 Y 2026 GSA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Jan 2026 Mar 2026 12 0.587 Y 2027 GSA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Jan 2027 Mar 2027 13 0.587 Y 2025 Highland Engineering / Howell MI MIPR AFLCMC/WN - Agile Combat Systems Oct 2025 Dec 2025 2 0.630 Y 2026 / Howell MI / Howell MI MIPR AFLCMC/WN - Agile Combat Systems Nov 2025 Jan 2026 6 0.673 Y 2027 / Howell MI / Howell MI MIPR AFLCMC/WN - Agile Combat Systems Sep 2026 Dec 2026 7 0.689 Y 2026 TBD / TBD TBD AFLCMC/WN - Agile Combat Systems Dec 2025 Sep 2026 8 1.104 Y 2027 TBD / TBD TBD AFLCMC/WN - Agile Combat Systems Oct 2026 Mar 2027 55 1.131 Y 2025 Cummins / Wisconsin MIPR AFLCMC/WN - Agile Combat Systems Feb 2025 Apr 2025 88 0.055 Y Location of PCO UNCLASSIFIED Page 8 of 22 Award Date Date of First Delivery P-1 Line #59 Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date Volume 1 - 716 === page 753 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 O O C Cost Elements POWER PRODUCTION-MEDIUM (†) POWER GENERATORS 60Kw (†) SHELTERS ESSS (†) SHELTERS ESSS (†) SHELTERS ESSS ENVIRONMENTAL- HVAC UNITS (†) ENVIRONMENTAL- HVAC UNITS (†) ENVIRONMENTAL- HVAC UNITS (†) ARRK A1 Kit (†) ARRK A1 Kit (†) POWER PRODUCTION - PDP UNITS (†) POWER PRODUCTION - PDP UNITS (†) POWER PRODUCTION - PDP UNITS (†) POWER PRODUCTION - CABLE REEL PALLET ASSEMBLIES (†) POWER PRODUCTION - CABLE REEL PALLET ASSEMBLIES (†) POWER PRODUCTION - CABLE REEL PALLET ASSEMBLIES (†) POWER PRODUCTION DISTRIBUTION BOX (†) POWER PRODUCTION DISTRIBUTION BOX (†) POWER PRODUCTION DISTRIBUTION BOX (†) LI 845420 - Mobility Equipment Air Force P-1 Line Item Number / Title: 845420 / Mobility Equipment Item Number / Title [DODIC]: Mobility Equipment FY Contractor and Location Method/Type or Funding Vehicle 2027 Cummins / Wisconsin MIPR AFLCMC/WN - Agile Combat Systems Oct 2026 Dec 2026 144 0.059 Y 2025 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Dec 2024 Jan 2025 372 0.020 Y 2026 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Mar 2026 Apr 2026 264 0.020 Y 2027 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Dec 2026 Feb 2027 72 0.021 Y 2025 GSA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Jan 2025 Mar 2025 420 0.022 Y 2026 GSA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Sep 2025 Oct 2025 656 0.022 Y 2027 GSA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Dec 2026 Jan 2027 162 0.023 Y 2026 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Oct 2025 Oct 2025 9 1.066 Y 2027 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Dec 2026 Feb 2027 29 1.093 Y 2025 ATAP / Virginia MIPR AFLCMC/WN - Agile Combat Systems Nov 2024 Dec 2024 48 0.004 Y 2026 SRC / Various Various AFLCMC/WN - Agile Combat Systems Nov 2025 Dec 2025 34 0.004 Y 2027 SRC / Various Various AFLCMC/WN - Agile Combat Systems Jan 2027 Mar 2027 30 0.004 Y 2025 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Oct 2024 Nov 2024 17 0.187 Y 2026 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Feb 2026 Mar 2026 4 0.194 Y 2027 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Jan 2027 Mar 2027 10 0.199 Y 2025 ATAP / Alabama MIPR AFLCMC/WN - Agile Combat Systems Jan 2025 Mar 2025 9 0.065 Y 2026 GSA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Sep 2025 Oct 2025 21 0.068 Y 2027 GSA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Jan 2027 Feb 2027 10 0.070 Y Location of PCO UNCLASSIFIED Page 9 of 22 Award Date Date of First Delivery P-1 Line #59 Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date Volume 1 - 717 === page 754 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 O O C Cost Elements 8K DOME MAINTENANCE (†) SHELTERS 8K DOME MAINTENANCE (†) SHELTERS MOBILE RUNWAY EDGE SHEAVES (†) MOBILE RUNWAY EDGE SHEAVES (†) WATER PRODUCTION - SUPPLY DISTRIBUTION SYSTEM (†) WATER PRODUCTION - SUPPLY DISTRIBUTION SYSTEM (†) WATER PRODUCTION - SUPPLY DISTRIBUTION SYSTEM (†) WATER PRODUCTION - WATER (†) FOLLOW-ON SYSTEM WATER PRODUCTION - WATER (†) FOLLOW-ON SYSTEM WATER PRODUCTION - WATER (†) FOLLOW-ON SYSTEM FLIGHTLINE LIGHTING - TF-2 LIGHT CARTS (†) FLIGHTLINE LIGHTING - TF-2 LIGHT CARTS (†) FLIGHTLINE LIGHTING - TF-2 LIGHT CARTS (†) GENERATOR WHEEL KITS (†) GENERATOR WHEEL KITS (†) GENERATOR WHEEL KITS (†) LARGER AREA MAINTENANCE (†) SHELTERS LARGER AREA MAINTENANCE (†) SHELTERS LI 845420 - Mobility Equipment Air Force P-1 Line Item Number / Title: 845420 / Mobility Equipment Item Number / Title [DODIC]: Mobility Equipment FY Contractor and Location Method/Type or Funding Vehicle 2025 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Dec 2024 Feb 2025 2 0.432 Y 2026 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Nov 2026 Mar 2027 4 0.428 Y 2025 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Dec 2024 Mar 2025 3 0.274 Y 2027 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Jan 2027 Apr 2027 38 0.284 Y 2025 Highland Engineering / Howell, MI MIPR AFLCMC/WN - Agile Combat Systems Dec 2024 Mar 2025 2 0.853 Y 2026 Highland Engineering / Howell, MI MIPR AFLCMC/WN - Agile Combat Systems Jan 2026 Feb 2026 4 0.851 Y 2027 Highland Engineering / Howell, MI MIPR AFLCMC/WN - Agile Combat Systems Jan 2027 Mar 2027 8 0.873 Y 2025 Highland Engineering / Howell, MI MIPR AFLCMC/WN - Agile Combat Systems Sep 2024 Nov 2024 2 0.450 Y 2026 Highland Engineering / Howell, MI MIPR AFLCMC/WN - Agile Combat Systems Sep 2025 Nov 2025 2 0.471 Y 2027 Highland Engineering / Howell, MI MIPR AFLCMC/WN - Agile Combat Systems Feb 2027 Apr 2027 6 0.483 Y 2025 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Dec 2024 Mar 2025 34 0.027 Y 2026 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Feb 2026 Mar 2026 35 0.029 Y 2027 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Jan 2027 Mar 2027 30 0.029 Y 2025 ATAP / Alabama MIPR AFLCMC/WN - Agile Combat Systems Oct 2024 Jan 2025 68 0.014 Y 2026 SRC / Various Various AFLCMC/WN - Agile Combat Systems Sep 2025 Oct 2025 63 0.015 Y 2027 SRC / Various Various AFLCMC/WN - Agile Combat Systems Oct 2026 Dec 2026 165 0.015 Y 2026 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Jan 2026 Apr 2026 5 0.275 Y 2027 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Dec 2026 Feb 2027 15 0.314 Y Location of PCO UNCLASSIFIED Page 10 of 22 Award Date Date of First Delivery P-1 Line #59 Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date Volume 1 - 718 === page 755 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 Cost Elements O O C ENVIRONMENTAL - HEATER UNITS (†) ENVIRONMENTAL - HEATER UNITS (†) (†) LAUNDRY SYSTEMS (†) LAUNDRY SYSTEMS (†) LAUNDRY SYSTEMS WATER PRODUCTION PUMPING UNITS (†) WATER PRODUCTION PUMPING UNITS (†) WATER PRODUCTION PUMPING UNITS (†) PDP 30Kw (†) PDP 30Kw (†) PDP 30Kw (†) POWER PRODUCTION SWITCHING UNITS (†) POWER PRODUCTION SWITCHING UNITS (†) POWER PRODUCTION SWITCHING UNITS (†) POWER PRODUCTION MEDIUM GENS 30Kw (†) POWER PRODUCTION MEDIUM GENS 30Kw (†) AIRFIELD LIGHTING WITHOUT MALSR (†) AIRFIELD LIGHTING WITHOUT MALSR (†) LI 845420 - Mobility Equipment Air Force P-1 Line Item Number / Title: 845420 / Mobility Equipment Item Number / Title [DODIC]: Mobility Equipment FY Contractor and Location Method/Type or Funding Vehicle 2025 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Sep 2024 Nov 2024 273 0.008 Y 2027 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Dec 2026 Feb 2027 40 0.008 Y 2025 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Jan 2025 Mar 2025 14 0.072 Y 2026 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Jan 2026 Apr 2026 2 0.090 Y 2027 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Dec 2026 Jan 2027 4 0.092 Y 2025 Highland Engineering / Howell, MI MIPR AFLCMC/WN - Agile Combat Systems Feb 2025 Apr 2025 1 0.262 Y 2026 Highland Engineering / Howell, MI MIPR AFLCMC/WN - Agile Combat Systems Jan 2026 Apr 2026 4 0.273 Y 2027 Highland Engineering / Howell, MI MIPR AFLCMC/WN - Agile Combat Systems Dec 2026 Feb 2027 14 0.277 Y 2025 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Sep 2024 Nov 2024 164 0.003 Y 2026 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Sep 2025 Nov 2025 50 0.004 Y 2027 SRC / Various Various AFLCMC/WN - Agile Combat Systems Nov 2026 Jan 2027 54 0.004 Y 2025 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Sep 2024 Oct 2024 7 0.127 Y 2026 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Sep 2025 Nov 2025 9 0.180 Y 2027 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Jan 2027 Feb 2027 10 0.185 Y 2026 Cummins / Wisconsin MIPR AFLCMC/WN - Agile Combat Systems Dec 2025 Jan 2026 6 0.048 Y 2027 Cummins / Wisconsin MIPR AFLCMC/WN - Agile Combat Systems Feb 2027 Mar 2027 24 0.050 Y 2026 GSA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Sep 2025 Nov 2025 8 2.221 Y 2027 GSA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Feb 2027 Apr 2027 17 2.276 Y Location of PCO UNCLASSIFIED Page 11 of 22 Award Date Date of First Delivery P-1 Line #59 Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date Volume 1 - 719 === page 756 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 Cost Elements (†) ARRK A2 Kit (†) ARRK A2 Kit (†) ARRK A3 Kit (†) ARRK A3 Kit (†) ARRK A4 Kit (†) ARRK A4 Kit (†) ARRK A5 Kit (†) ARRK A5 Kit (†) O O C P-1 Line Item Number / Title: 845420 / Mobility Equipment Item Number / Title [DODIC]: Mobility Equipment FY Contractor and Location Method/Type or Funding Vehicle 2026 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Jan 2026 Apr 2026 2 1.200 Y 2027 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Dec 2026 Feb 2027 13 1.230 Y 2026 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Jan 2026 Apr 2026 9 0.851 Y 2027 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Dec 2026 Feb 2027 32 0.873 Y 2026 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Jan 2026 Apr 2026 9 0.207 Y 2027 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Dec 2026 Feb 2027 38 0.206 Y 2026 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Jan 2026 Apr 2026 9 0.271 Y 2027 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Dec 2026 Feb 2027 40 0.278 Y Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date indicates the presence of a P-21 Remarks: Unit Costs are assumed and subject to change due to various factors including supply chain fluctuations. LI 845420 - Mobility Equipment Air Force UNCLASSIFIED Page 12 of 22 P-1 Line #59 Volume 1 - 720 === page 757 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 845420 / Mobility Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Mobility Equipment Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P BASE LIGHTING - REMOTE AREA LIGHTING 1 2025 AF 12 0 12 1 2026 AF 8 0 8 A - - - 2 2 2 2 2 2 0 8 1 2027 AF 8 0 8 8 BEAR High Power (BPU) 2 2025 AF 27 0 27 2 2026 AF 13 0 13 A - - - 3 4 4 4 4 4 4 13 0 2 2027 AF 16 0 16 16 AIRFIELD LIGHTING With MALSR 3 2025 AF 18 0 18 3 2026 AF 3 0 3 3 2027 AF 2 0 2 A - - - - - - 3 3 3 9 A - 3 2 HYGIENE 4 2025 AF 5 0 5 4 2026 AF 12 0 12 A - - 1 1 1 1 1 12 0 4 2027 AF 13 0 13 13 WATER PRODUCTION- SOURCE RUN 5 2025 AF 2 0 2 2 6 2026 AF 6 0 6 6 6 2027 AF 7 0 7 7 MOBILE AIRCRAFT ARRESTING SYSTEM 7 2026 AF 8 0 8 8 7 2027 AF 55 0 55 55 POWER PRODUCTION-MEDIUM POWER GENERATORS 60Kw 8 2025 AF 88 0 88 8 2027 AF 144 0 144 A - - 15 15 15 15 15 13 0 144 SHELTERS ESSS 9 2025 AF 372 0 372 9 2026 AF 264 0 264 A - 41 41 41 41 41 41 42 42 42 264 0 9 2027 AF 72 0 72 72 ENVIRONMENTAL- HVAC UNITS 10 2025 AF 420 0 420 10 2026 AF 656 0 656 A - 52 52 52 52 53 53 53 A - O C T LI 845420 - Mobility Equipment Air Force - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 22 S E P O C T N O V D E C J A N F E B P-1 Line #59 M A R A P R M A Y J U N J U L A U G 53 656 S E P Volume 1 - 721 === page 758 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 845420 / Mobility Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 Cost Elements (Units in Each) O O C M F R # FY 10 2027 SERVICE AF PROC QTY Item Number / Title [DODIC]: Mobility Equipment Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT 162 0 Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 162 162 ARRK A1 Kit 11 2026 AF 9 0 9 9 11 2027 AF 29 0 29 29 POWER PRODUCTION - PDP UNITS 12 2025 AF 48 0 48 13 2026 AF 34 0 34 A - 8 8 8 8 8 8 34 0 13 2027 AF 30 0 30 30 POWER PRODUCTION - CABLE REEL PALLET ASSEMBLIES 14 2025 AF 17 0 17 14 2026 AF 4 0 4 A - 2 2 2 2 2 2 2 3 0 4 14 2027 AF 10 0 10 10 POWER PRODUCTION - DISTRIBUTION BOX 15 2025 AF 9 0 9 16 2026 AF 21 0 21 16 2027 AF 10 0 10 A - - 2 2 2 2 1 0 A - 21 10 8K DOME MAINTENANCE SHELTERS 17 2025 AF 2 0 2 17 2026 AF 4 0 4 A - - 1 1 0 4 MOBILE RUNWAY EDGE SHEAVES 18 2025 AF 3 0 3 18 2027 AF 38 0 38 A - - - 1 1 1 0 38 WATER PRODUCTION - SUPPLY DISTRIBUTION SYSTEM 19 2025 AF 2 0 2 19 2026 AF 4 0 4 A - - - 1 1 0 4 19 2027 AF 8 0 8 8 WATER PRODUCTION - WATER FOLLOW-ON SYSTEM 20 2025 AF 2 0 2 20 2026 AF 2 0 2 20 2027 AF 6 0 6 A - - 1 1 0 A - 2 6 FLIGHTLINE LIGHTING - TF-2 LIGHT CARTS 21 2025 AF 34 0 34 21 2026 AF 35 0 35 A - - 4 5 5 5 5 5 5 0 35 O C T LI 845420 - Mobility Equipment Air Force - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 22 S E P O C T N O V D E C J A N F E B P-1 Line #59 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 722 === page 759 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 845420 / Mobility Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 Cost Elements (Units in Each) O O C M F R # FY 21 2027 SERVICE AF PROC QTY Item Number / Title [DODIC]: Mobility Equipment Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT 30 0 30 Fiscal Year 2025 Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 30 GENERATOR WHEEL KITS 22 2025 AF 68 0 68 23 2026 AF 63 0 63 23 2027 AF 165 0 165 A - - - 9 9 10 10 10 10 10 0 A - 63 165 LARGER AREA MAINTENANCE SHELTERS 24 2026 AF 5 0 5 5 24 2027 AF 15 0 15 15 ENVIRONMENTAL - HEATER UNITS 25 2025 AF 273 0 273 25 2027 AF 40 0 40 A - - 34 34 34 34 34 34 34 35 0 40 LAUNDRY SYSTEMS 26 2025 AF 14 0 14 26 2026 AF 2 0 2 A - - 2 2 2 2 3 3 0 2 26 2027 AF 4 0 4 4 WATER PRODUCTION PUMPING UNITS 27 2025 AF 1 0 1 27 2026 AF 4 0 4 A - - 1 0 4 27 2027 AF 14 0 14 14 28 2025 AF 164 0 164 28 2026 AF 50 0 50 28 2027 AF 54 0 54 PDP 30Kw A - - 20 20 20 20 21 21 21 21 0 A - 50 54 POWER PRODUCTION SWITCHING UNITS 29 2025 AF 7 0 7 29 2026 AF 9 0 9 29 2027 AF 10 0 10 A - 2 2 2 1 0 A - 9 10 POWER PRODUCTION MEDIUM GENS 30Kw 30 2026 AF 6 0 6 6 30 2027 AF 24 0 24 24 AIRFIELD LIGHTING WITHOUT MALSR 31 2026 AF 8 0 8 31 2027 AF 17 0 17 A O C T LI 845420 - Mobility Equipment Air Force 8 17 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 22 S E P O C T N O V D E C J A N F E B P-1 Line #59 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 723 === page 760 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 845420 / Mobility Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Mobility Equipment Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Fiscal Year 2025 Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E ARRK A2 Kit 32 2026 AF 2 0 2 2 32 2027 AF 13 0 13 13 ARRK A3 Kit 33 2026 AF 9 0 9 9 33 2027 AF 32 0 32 32 ARRK A4 Kit 34 2026 AF 9 0 9 9 34 2027 AF 38 0 38 38 ARRK A5 Kit 35 2026 AF 9 0 9 9 35 2027 AF 40 0 40 40 O C T LI 845420 - Mobility Equipment Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 22 S E P O C T N O V D E C J A N F E B P-1 Line #59 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 724 === page 761 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 845420 / Mobility Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Mobility Equipment Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P BASE LIGHTING - REMOTE AREA LIGHTING 1 2025 AF 12 12 0 1 2026 AF 8 0 8 1 2027 AF 8 0 8 0 A2 2 2 2 0 A - - 3 3 2 0 BEAR High Power (BPU) 2 2025 AF 27 27 0 2 2026 AF 13 0 13 2 2027 AF 16 0 16 0 A - 2 2 2 2 2 2 1 0 A - - 2 2 2 2 2 2 2 2 0 AIRFIELD LIGHTING With MALSR 3 2025 AF 18 9 9 3 2026 AF 3 0 3 3 2027 AF 2 0 2 3 3 - 3 - 0 - 1 1 1 0 A - - - 1 1 0 HYGIENE 4 2025 AF 5 5 0 4 2026 AF 12 0 12 4 2027 AF 13 0 13 0 A - - 2 2 3 3 2 0 A - - 2 3 2 2 2 2 0 WATER PRODUCTION- SOURCE RUN 5 2025 AF 2 0 2 6 2026 AF 6 0 6 6 2027 AF 7 0 7 A - - 1 A - 1 - 0 1 1 1 1 1 1 0 A - - - 1 1 1 1 1 1 1 1 0 MOBILE AIRCRAFT ARRESTING SYSTEM 7 2026 AF 8 0 8 7 2027 AF 55 0 55 A - - - - - - - - - 1 1 1 A - 1 - 1 - 1 - 1 - 7 8 8 8 8 0 A - - 18 18 18 18 18 18 18 18 8 8 0 POWER PRODUCTION-MEDIUM POWER GENERATORS 60Kw 8 2025 AF 88 88 0 8 2027 AF 144 0 144 0 0 SHELTERS ESSS 9 2025 AF 372 372 0 9 2026 AF 264 0 264 9 2027 AF 72 0 72 0 A - 44 44 44 44 44 44 0 A - - 12 12 12 12 12 12 0 ENVIRONMENTAL- HVAC UNITS 10 2025 AF 420 367 53 53 10 2026 AF 656 0 656 65 O C T LI 845420 - Mobility Equipment Air Force 0 65 N O V 65 D E C 65 J A N 66 F E B 66 M A R 66 A P R 66 M A Y 66 J U N 66 J U L 0 A U G UNCLASSIFIED Page 17 of 22 S E P O C T N O V D E C J A N F E B P-1 Line #59 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 725 === page 762 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 845420 / Mobility Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 Cost Elements (Units in Each) O O C M F R # FY 10 2027 SERVICE AF PROC QTY Item Number / Title [DODIC]: Mobility Equipment Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT 162 0 Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V 162 D E C J A N F E B M A R A P R M A Y J U N J U L A - 27 27 27 27 27 27 A - - 3 3 3 4 4 A U G S E P 0 ARRK A1 Kit 11 2026 AF 9 0 9 11 2027 AF 29 0 29 A3 3 3 0 4 4 4 0 POWER PRODUCTION - PDP UNITS 12 2025 AF 48 48 0 13 2026 AF 34 0 34 13 2027 AF 30 0 30 0 A - 5 5 5 5 5 5 4 0 A - - 6 6 6 6 6 0 POWER PRODUCTION - CABLE REEL PALLET ASSEMBLIES 14 2025 AF 17 17 0 14 2026 AF 4 0 4 14 2027 AF 10 0 10 0 A - 2 2 0 A - - 2 2 2 2 2 0 POWER PRODUCTION - DISTRIBUTION BOX 15 2025 AF 9 9 0 16 2026 AF 21 0 21 16 2027 AF 10 0 10 0 3 3 3 3 3 3 3 0 A - 2 2 2 2 2 1 1 1 1 6 6 6 0 8K DOME MAINTENANCE SHELTERS 17 2025 AF 2 2 0 17 2026 AF 4 0 4 0 A - - - - A - - 0 MOBILE RUNWAY EDGE SHEAVES 18 2025 AF 3 3 0 18 2027 AF 38 0 38 0 - 6 6 8 0 WATER PRODUCTION - SUPPLY DISTRIBUTION SYSTEM 19 2025 AF 2 2 0 19 2026 AF 4 0 4 19 2027 AF 8 0 8 0 A - 1 1 1 1 0 A - - 1 1 1 1 2 2 0 WATER PRODUCTION - WATER FOLLOW-ON SYSTEM 20 2025 AF 2 2 0 20 2026 AF 2 0 2 20 2027 AF 6 0 6 0 - 1 1 0 A - - 1 1 1 1 1 1 0 FLIGHTLINE LIGHTING - TF-2 LIGHT CARTS 21 2025 AF 34 34 0 21 2026 AF 35 0 35 0 A O C T LI 845420 - Mobility Equipment Air Force N O V D E C J A N F E B 5 M A R 5 A P R 5 M A Y 5 J U N 5 J U L 5 A U G UNCLASSIFIED Page 18 of 22 5 S E P 0 O C T N O V D E C J A N F E B P-1 Line #59 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 726 === page 763 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 845420 / Mobility Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 Cost Elements (Units in Each) O O C M F R # FY 21 2027 SERVICE AF PROC QTY Item Number / Title [DODIC]: Mobility Equipment Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT 30 0 Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N 30 F E B A - M A R A P R - 5 M A Y 5 J U N 5 J U L 5 A U G 5 S E P 5 0 GENERATOR WHEEL KITS 22 2025 AF 68 68 0 23 2026 AF 63 0 63 23 2027 AF 165 0 165 0 9 9 9 9 9 9 9 0 A - - 16 16 16 16 16 17 17 17 17 A - - 2 2 2 2 2 2 3 A - - 8 8 8 8 8 17 0 LARGER AREA MAINTENANCE SHELTERS 24 2026 AF 5 0 5 24 2027 AF 15 0 15 A - - - 1 1 1 1 1 0 0 ENVIRONMENTAL - HEATER UNITS 25 2025 AF 273 273 0 25 2027 AF 40 0 40 0 0 LAUNDRY SYSTEMS 26 2025 AF 14 14 0 26 2026 AF 2 0 2 26 2027 AF 4 0 4 0 A - - - 1 1 0 A - 1 1 1 1 0 WATER PRODUCTION PUMPING UNITS 27 2025 AF 1 1 0 27 2026 AF 4 0 4 27 2027 AF 14 0 14 28 2025 AF 164 164 0 28 2026 AF 50 0 50 28 2027 AF 54 0 54 0 A - - - 1 1 1 1 0 A - - 2 2 2 2 2 2 2 0 PDP 30Kw 0 - 8 8 8 8 9 9 0 A - - 7 7 8 8 8 8 8 0 POWER PRODUCTION SWITCHING UNITS 29 2025 AF 7 7 0 29 2026 AF 9 0 9 29 2027 AF 10 0 10 0 - 2 2 2 2 1 0 A - 2 2 2 2 2 0 4 4 4 4 4 4 3 3 3 3 3 POWER PRODUCTION MEDIUM GENS 30Kw 30 2026 AF 6 0 6 30 2027 AF 24 0 24 A - 2 2 2 0 A - 0 AIRFIELD LIGHTING WITHOUT MALSR 31 2026 AF 8 0 8 31 2027 AF 17 0 17 - 2 2 2 0 A - O C T LI 845420 - Mobility Equipment Air Force 2 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 19 of 22 S E P O C T N O V D E C J A N F E B P-1 Line #59 M A R A P R M A Y J U N J U L A U G 2 S E P Volume 1 - 727 0 === page 764 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 845420 / Mobility Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Mobility Equipment Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P ARRK A2 Kit 32 2026 AF 2 0 2 32 2027 AF 13 0 13 A - - - 1 1 0 A - - 2 2 2 2 2 2 1 0 A - - 4 4 4 5 5 5 5 A - - 4 4 5 5 5 5 5 5 A - - 5 5 5 5 5 5 5 5 ARRK A3 Kit 33 2026 AF 9 0 9 33 2027 AF 32 0 32 A - - - 1 2 2 2 2 0 0 ARRK A4 Kit 34 2026 AF 9 0 9 34 2027 AF 38 0 38 A - - - 1 2 2 2 2 0 0 ARRK A5 Kit 35 2026 AF 9 0 9 35 2027 AF 40 0 40 A O C T LI 845420 - Mobility Equipment Air Force N O V D E C J A N F E B M A R 2 A P R 2 M A Y 2 J U N 3 J U L 0 A U G UNCLASSIFIED Page 20 of 22 S E P O C T N O V D E C J A N F E B P-1 Line #59 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 728 0 === page 765 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 845420 / Mobility Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 Item Number / Title [DODIC]: Mobility Equipment Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 GSA - Virginia 2 16 24 0 0 0 0 1 1 2 3 2 Cummins - Wisconsin 1 12 24 0 0 0 0 1 1 2 3 3 GSA - Virginia 1 4 8 0 0 0 0 1 4 3 7 4 GSA - Virginia 2 10 20 0 0 0 0 1 4 2 6 0 0 0 0 0 0 0 0 5 Highland Engineering Howell MI 6 / Howell MI - Howell MI 1 7 14 0 0 0 0 1 0 3 3 7 TBD - TBD 8 36 60 1 1 5 6 0 0 0 0 8 Cummins - Wisconsin 1 100 200 0 0 0 0 1 1 2 3 9 DLA - Virginia 24 144 244 0 0 0 0 1 3 2 5 10 GSA - Virginia 100 700 1,200 0 0 0 0 1 3 1 4 11 DLA - Virginia 3 24 48 0 0 0 0 1 3 2 5 0 0 0 0 0 0 0 0 12 ATAP - Virginia 13 SRC - Various 1 48 96 0 0 0 0 1 4 2 6 14 DLA - Virginia 1 12 20 0 0 0 0 1 4 2 6 0 0 0 0 0 0 0 0 15 ATAP - Alabama 16 GSA - Virginia 1 10 20 0 0 0 0 1 4 1 5 17 DLA - Virginia 1 12 24 0 0 0 0 1 14 4 18 18 DLA - Virginia 1 10 40 0 0 0 0 1 4 3 7 19 Highland Engineering Howell, MI 1 6 12 0 0 0 0 1 4 2 6 20 Highland Engineering Howell, MI 1 6 16 0 0 0 0 1 5 2 7 21 DLA - Virginia 1 20 40 0 0 0 0 1 4 2 6 0 0 0 0 0 0 0 0 22 ATAP - Alabama 23 SRC - Various 1 100 200 0 0 0 0 1 1 2 3 24 SRC - Various 1 10 20 0 0 0 0 1 3 2 5 25 SRC - Various 5 40 75 0 0 0 0 1 3 2 5 26 SRC - Various 1 10 22 0 0 0 0 1 3 1 4 27 Highland Engineering Howell, MI 2 18 36 0 0 0 0 1 3 2 5 28 SRC - Various 2 40 100 0 0 0 0 1 2 2 4 29 SRC - Various 1 10 20 0 0 0 0 1 4 1 5 30 Cummins - Wisconsin 1 24 48 0 5 1 6 1 5 1 6 LI 845420 - Mobility Equipment Air Force UNCLASSIFIED Page 21 of 22 P-1 Line #59 Volume 1 - 729 === page 766 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 845420 / Mobility Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 Item Number / Title [DODIC]: Mobility Equipment Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 31 GSA - Virginia 1 6 25 0 0 0 0 1 5 2 7 32 DLA - Virginia 1 15 30 0 0 0 0 1 3 2 5 33 DLA - Virginia 2 40 80 0 0 0 0 1 3 2 5 34 DLA - Virginia 2 40 70 0 0 0 0 1 3 2 5 35 DLA - Virginia 2 40 80 0 0 0 0 1 3 2 5 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 845420 - Mobility Equipment Air Force UNCLASSIFIED Page 22 of 22 P-1 Line #59 Volume 1 - 730 === page 767 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 845550 / Fuels Support Equipment (FSE) Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 5: Base Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - Procurement Quantity (Units in Each) - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 24.563 34.794 81.066 - 81.066 73.067 75.606 Less PY Advance Procurement ($ in Millions) - - - - - - - - Net Procurement (P-1) ($ in Millions) - 24.563 34.794 81.066 - 81.066 73.067 75.606 Plus CY Advance Procurement ($ in Millions) - - - - - - - - Total Obligation Authority ($ in Millions) - 24.563 34.794 81.066 - 81.066 73.067 75.606 197.944 197.944 197.944 To FY 2031 Complete - - 74.534 - - - 74.534 - - - 74.534 - Total 561.574 561.574 561.574 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The Fuels Support Equipment (FSE) program funds for the procurement of Fuels Operational Readiness Capability Equipment (FORCE). It provides the capability to receive, store, and issue petroleum products and support aircraft generation in austere locations where fixed systems do not exist or which require augmentation. This equipment is part of the Air Force's prepositioned war reserve materiel (WRM) and will be managed in accordance with 10 U.S.C. 2229, Strategic Policy on Prepositioning of Materiel and Equipment. The FY 2026 spend plan amount includes $34,794 thousand of discretionary and $29,000 thousand mandatory (reconciliation) for a total of $63,794 thousand. Mandatory funds spend plan includes procurement of Force Servicing variations (6 of FS, 5 of RC), Aerial Bulk Fuel Delivery Systems/Agile Fueling Systems (20), R19 Fuel Separator Unit (11), R18 Fuel Pumping Assembly (17), R20 Servicing Platform (5), and Joint Spoke Refueler (19). 3K Collapsible Fuel Tanks (CFT) are specifically designed to be loaded on military aircraft and withstand the critical demands put on them during flight operations, in conjunction with the ABFDS they provide the ability to transfer fuel from the aircraft storage bladder while aircraft engines are running. Aerial Bulk Fuel Delivery System (ABFDS)/Agile Fueling System (AFS): Designed for aerial delivery of fuel to locations where other methods of transportation are impractical. It enables aircraft to rapidly transport fuel to locations close to or behind enemy lines and is a key component to the AF Special Operations community and their ability to complete Forward Area Refueling Point missions. All-Terrain Berm: Portable secondary containment system designed to be used with large primary fluid storage devices that do not have integral secondary containment capabilities such as Fuel Storage Bladders. It protects the surrounding environment from potential liquid spills that may contaminate the soil or water supply. These berms are quickly deployable, structurally supported liner systems providing temporary containment in harsh austere/semi-austere locations that do not allow permanent construction, especially in challenging environments. Fluid Powered Additive Injector Cart (FPAIC): allows injection of additives (corrosion inhibitor, static dissipater, and fuel system icing inhibitor) into commercial aviation grade fuel to convert it into military grade fuel in austere locations. FORCE Servicing (FS), Receipt (RC) and Sustainment (SC) is a deployable modular fuel system that can provide joint capability to fuel aircraft and support equipment at forward locations. The FORCE system can be configured to perform limited aircraft fueling missions or to sustain massive daily fueling requirements for months. FORCE is capable of receiving, transferring, and issuing fuel at a throughput rate of 900 Gallons per Minute (GPM). The individual pieces of equipment that comprise the FORCE system provide stand-alone or mix-and-match capability for almost any fuel transfer or aircraft refueling scenario. The full LI 845550 - Fuels Support Equipment (FSE) Air Force UNCLASSIFIED Page 1 of 14 P-1 Line #60 Volume 1 - 731 === page 768 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 845550 / Fuels Support Equipment (FSE) Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 5: Base Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A capability mission of the complete FORCE System, when used in conjunction with fabric fuel bladders, provides a deployable, above ground, constant pressure, flow-on demand fueling system for aircraft, i.e., a hydrant-type fueling system. FSE Lab Equipment contain a variety of high-tech equipment such as flash point testers, density meters, and oxidation stability analyzers to test samples from fuel tanks for contaminants. Fuel Bladders: Collapsible Fuel Tanks (CFT) or more commonly referred to as fuel bladders provide fuel storage capabilities at austere or forward operating locations where infrastructure is either inadequate or non-existent. Bladders sizes range from 10K, 50K and 210K gallons of fuel storage, these bladders are capable of holding a multitude of petroleum products to support both air and ground operations. Collapsible fuel tanks are used with Fuels Operational Readiness Capability Equipment (FORCE) to support various aircraft systems at forward operating locations. Fuels Pumping & Distribution provides multiple capabilities to receive and deliver petroleum products to initiate and sustain ground and air operations for both expeditionary and contingency operations. Ensures the ability to service smaller aircraft such as UAV's and base support vehicles and increases the distance that fuel loads can be safely distributed to the base up to 3 miles. Joint Spoke Refueler: A light and lean refueling capability to generate aircraft in any environment and can be paired with fuel bladders that range in volume from 10,000 to 210,000 gallons. LOX/Lin Tanks, are deployable liquid oxygen/liquid nitrogen storage tanks that can receive, store, and issue liquid oxygen or nitrogen products to service carts or smaller tanks. Provides bulk storage capacity and is used to fill smaller cryogenic equipment (8-Cylinder trailers, 50-Gallon LOX Tank) and aircraft. PMU-27M Pumping Assembly: A trailer-mounted, engine powered unit consisting of a 50-gpm pump, filter separator, with associated hoses, connections, nozzles and meter. It is used to service small aircraft or vehicles, or transfer fuel into or out of four 55-gallon drums simultaneously, pumping from an external source and defueling aircraft auxiliary tanks. The unit is also a ground fuels-dispensing unit. R-18 Fuel Pumping Assembly is a trailer-mounted pumping unit that provides self-priming and air-eliminating pump offloads to trucks at the base perimeter. It delivers fuel through 6-inch hose lines to interim storage systems and provides fuel flow at 900 gpm/150 psi at a distance of 10,000 feet to the R-20 Multi-Aircraft Servicing Platform. R-19 Fuel Separator is a mobile filtration system used for high-rate fueling in combat situations that require separation of particulate and water from fuel. It can flow upwards of 1,200 gallons per minute (gpm) when running in parallel or 600 gpm individually. Designed for reliability and ease of transport, the R19 is part of a 4-piece system that includes the R18, R20, and R21 carts. R-20 Multi-Aircraft Servicing Platform is the interface between one or two receiver aircraft. It has a combined fueling capability of 900 gpm through two 2.5-inch, 60-foot semi-collapsible servicing hoses (450 gpm through each hose). The R-20 is a trailer-mounted servicing platform and weighs about 4,600 lbs. Tactical Automated Service Station: TASS is a trailer-mounted automated ground fuel issue point for vehicles and support equipment at deployed locations. It is capable of delivering DF-2, JP-8 and MOGAS at a minimum rate of ten gallons per minute (10 GPM) through each dispensing nozzle. The TASS provides an interface between bulk fuel transport trailers or other fuel sources and vehicles/support equipment requiring ground fuel. This requirement supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Funding for this exhibit is contained in Program Element 0208031F War Reserve Materiel Equipment. LI 845550 - Fuels Support Equipment (FSE) Air Force UNCLASSIFIED Page 2 of 14 P-1 Line #60 Volume 1 - 732 === page 769 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 845550 / Fuels Support Equipment (FSE) Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 5: Base Support Equipment ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Fuels Support Equipment (FSE) P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 24.563 - / 34.794 - / 81.066 - / - - / 81.066 - / - - / 24.563 - / 34.794 - / 81.066 - / - - / 81.066 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 total of $81,066 thousand discretionary will fund procurement of Global Pre-Positioned War Reserve Materiel Fuels Support Equipment to provide the capability to receive, store, and issue petroleum products and support combat and mobility aircraft generation requirements in austere locations. The FY 2027 increase includes $39,648 thousand to procure prepositioned Fuels Support Equipment in direct support of increasing readiness, and posturing and sustaining a strong denial defense in the Indo-Pacific in alignment with the Agile Combat Employment concept and the National Defense Strategy. Items budgeted within this program include (but are not limited to) collapsible fuel tanks, Agile Fueling System -Air and -Ground, fuel pumping assemblies, fuel servicing platforms, ground fuel issuing service stations, additive injector equipment, and secondary containment systems (berms). These items enable aircraft weapon systems to refuel in austere ground environments. FY 2027 total also includes $3,647 thousand in support of non-WRM Operational Fuels Requirements. The FY 2026 spend plan amount includes $34,794 thousand of discretionary, of which $3,546 thousand is for non-WRM Operational Fuels Requirements, and $29,000 thousand mandatory (reconciliation) for a total of $63,794 thousand. The FY 2025 spend plan amount includes $24,546 thousand of discretionary funding. Planned quantities could change due to price increases, inflation, and supply chain fluctuations. Fuels Support Equipment assets significantly impact Contested Logistics and provide a cost-effective mix of investments that operationalize the Agile Combat Employment (ACE) concept (AFDN 1-21) in the Indo-Pacific. ACE is a proactive and reactive scheme of maneuver that shifts generation of airpower from large, fixed centralized bases to networks of smaller, dispersed bases. Prepositioned capabilities, ashore and afloat, place military equipment and supplies at or near the point of planned use to ensure timely support of Expeditionary Air Forces and other specific forces during the initial phases of an operation. These assets provide combatant commanders with initial capabilities and materiel until establishment of a mature and sustained Strategic/Theater Distribution Network (CJSCI 4310.01F). This program performs a critical role in Combatant Command (CCMD) requirements to support 5 major Operations Plans (OPLANs) and ensures the objectives of the National Defense Strategy can be executed. The Fuels Support Equipment program adheres to: 10 U.S.C. 2229, Strategic Policy on Prepositioning of Materiel and Equipment. LI 845550 - Fuels Support Equipment (FSE) Air Force UNCLASSIFIED Page 3 of 14 P-1 Line #60 Volume 1 - 733 === page 770 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 845550 / Fuels Support Equipment (FSE) Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Fuels Support Equipment (FSE) MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 24.563 34.794 81.066 - 81.066 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 24.563 34.794 81.066 - 81.066 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 24.563 34.794 81.066 - 81.066 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Fuels Support Equipment (FSE) Cost Recurring Cost FORCE SERVICING (FS) (†) 3k FUEL STORAGE BLADDERS (†) AERIAL BULK FUEL DELIVERY SYSTEM (ABFDS) / AGILE - - - 0.689 1 0.689 0.710 1 0.710 0.731 5 3.655 - - - 0.731 5 3.655 - - - 0.100 24 2.400 0.103 12 1.236 0.016 35 0.560 - - - 0.016 35 0.560 - - - 0.350 11 3.850 0.361 32 11.552 0.371 52 19.292 - - - 0.371 52 19.292 - - - - - - - - - 0.124 25 3.100 - - - 0.124 25 3.100 - - - 3.558 1 3.558 3.379 1 3.379 3.647 1 3.647 - - - 3.647 1 3.647 - - - 0.032 18 0.576 0.033 7 0.231 0.034 62 2.108 - - - 0.034 62 2.108 - - - 0.079 44 3.476 0.082 12 0.984 0.084 75 6.300 - - - 0.084 75 6.300 (†) FUELING SYSTEM FUELS PUMPING & DISTRIBUTION HOSE LINE (†) OPERATIONAL FSE FUNDING (NON(†) WRM ASSETS) 10 K All Terrain Berm (†) Storage System 50K All Terrain Berm (†) Storage System 210K All Terrain Berm - - - - - - 0.151 12 1.812 0.155 71 11.005 - - - 0.155 71 11.005 (†) - - - 0.012 15 0.180 0.013 11 0.143 0.016 42 0.672 - - - 0.016 42 0.672 (†) - - - 0.047 23 1.081 0.048 23 1.104 0.032 89 2.848 - - - 0.032 89 2.848 (†) Storage System 10K Fuel Bladders 50K Fuel Bladders LI 845550 - Fuels Support Equipment (FSE) Air Force UNCLASSIFIED Page 4 of 14 P-1 Line #60 Volume 1 - 734 === page 771 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 845550 / Fuels Support Equipment (FSE) Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Fuels Support Equipment (FSE) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) (†) - - - 0.090 46 4.140 0.092 13 1.196 0.095 28 2.660 - - - 0.095 28 2.660 FLUID POWERED ADDITIVE INJECTOR - - - 0.105 3 0.315 0.108 10 1.080 0.111 38 4.218 - - - 0.111 38 4.218 - - - 0.170 3 0.510 0.175 4 0.700 0.180 9 1.620 - - - 0.180 9 1.620 - - - 0.373 2 0.746 0.384 1 0.384 0.396 4 1.584 - - - 0.396 4 1.584 - - - - - 0.500 1 0.500 - - - - - - - - - - - - 0.242 6 1.452 0.249 4 0.996 0.256 15 3.840 - - - 0.256 15 3.840 - - - 0.360 1 0.360 - - 0.382 6 2.292 - - - 0.382 6 2.292 - - - 0.146 4 0.584 0.150 6 0.900 0.155 10 1.550 - - - 0.155 10 1.550 - - - - - - 0.375 19 7.125 0.366 25 9.150 - - - 0.366 25 9.150 Subtotal: Recurring Cost - - - - - 23.917 - - 34.032 - - 80.101 - - - - - 80.101 Subtotal: Hardware - Fuels Support Equipment (FSE) Cost - - - - - 23.917 - - 34.032 - - 80.101 - - - - - 80.101 210K Fuel Bladders (†) CART R19 Fuel Separator Unit (†) FORCE SERVICING (†) (RC) FORCE SERVICING (†) (SC) R18 FUEL PUMPIMG ASSEMBLY (†) R20 SERVICING (†) PLATFORM PMU 27 PUMP (†) JOINT SPOKE (†) REFUELER - - Support - Fuels Support Equipment (FSE) Cost PMA OTHER CONTRACTOR SERVICES (FORCE) - - - 0.541 1 0.541 0.502 1 0.502 0.575 1 0.575 - - - 0.575 1 0.575 TRANSPORTATION MOORD - - - 0.005 21 0.105 0.005 52 0.260 0.005 78 0.390 - - - 0.005 78 0.390 Subtotal: Support - Fuels Support Equipment (FSE) Cost - - - - - 0.646 - - 0.762 - - 0.965 - - - - - 0.965 Gross/Weapon System Cost - - - - - 24.563 - - 34.794 - - 81.066 - - - - - 81.066 Remarks: Unit Costs for FY 2027 are assumed and subject to change. The FY 2025 spend plan amount includes $24.563M discretionary and $29.0M mandatory (reconciliation) for a total of $53.563M. PMA Other Contractor Services: This funding includes provisions for government contract oversight, technical expertise, and FSE/FORCE program support. LI 845550 - Fuels Support Equipment (FSE) Air Force UNCLASSIFIED Page 5 of 14 P-1 Line #60 Volume 1 - 735 === page 772 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 P-1 Line Item Number / Title: 845550 / Fuels Support Equipment (FSE) ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Fuels Support Equipment (FSE) MDAP/MAIS Code: TRANSPORTATION: Includes cost to ship equipment from vendor to destination point. Requirements are subject to change based on shifts in Air Force priorities, operational requirements in the year of execution, contracts, and supply chain fluctuations. (†) indicates the presence of a P-5a LI 845550 - Fuels Support Equipment (FSE) Air Force UNCLASSIFIED Page 6 of 14 P-1 Line #60 Volume 1 - 736 === page 773 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 O O C P-1 Line Item Number / Title: 845550 / Fuels Support Equipment (FSE) Item Number / Title [DODIC]: Fuels Support Equipment (FSE) FY Contractor and Location Method/Type or Funding Vehicle 2025 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Nov 2024 Jan 2025 1 0.689 Y 2026 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Nov 2025 Feb 2026 1 0.710 Y 2027 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Jan 2027 Apr 2027 5 0.731 Y 2025 TBD / TBD TBD AFLCMC/WN - Agile Combat Systems Oct 2024 Feb 2025 24 0.100 Y 2026 TBD / TBD TBD AFLCMC/WN - Agile Combat Systems Jan 2026 Feb 2026 12 0.103 Y 3k FUEL STORAGE BLADDERS 2027 Various / Various MIPR AFLCMC/WN - Agile Combat Systems Dec 2026 Jan 2027 35 0.016 Y AERIAL BULK FUEL DELIVERY SYSTEM (ABFDS) / AGILE 2025 TBD / TBD MIPR AFLCMC/WN - Agile Combat Systems Oct 2024 Mar 2025 11 0.350 Y 2026 TBD / TBD TBD AFLCMC/WN - Agile Combat Systems Sep 2025 Oct 2025 32 0.361 Y 2027 Various / Various MIPR AFLCMC/WN - Agile Combat Systems Dec 2026 Feb 2027 52 0.371 Y 2027 DLA / VIrginia MIPR AFLCMC/WN - Agile Combat Systems Nov 2026 Jan 2027 25 0.124 Y 2025 TBD / TBD TBD AFLCMC/WN - Agile Combat Systems Jan 2025 Mar 2025 1 3.558 Y 2026 TBD / TBD TBD AFLCMC/WN - Agile Combat Systems Nov 2025 Dec 2025 1 3.379 Y 2027 Various / Various Various AFLCMC/WN - Agile Combat Systems Nov 2026 Apr 2027 1 3.647 Y 2025 TBD / TBD TBD AFLCMC/WN - Agile Combat Systems Feb 2025 May 2025 18 0.032 Y 2026 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Feb 2026 Apr 2026 7 0.033 Y 2027 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Nov 2026 Jan 2027 62 0.034 Y 2025 TBD / TBD TBD AFLCMC/WN - Agile Combat Systems Dec 2024 Mar 2025 44 0.079 Y Cost Elements FORCE SERVICING (FS) FORCE SERVICING (FS) FORCE SERVICING (FS) (†) 3k FUEL STORAGE BLADDERS (†) 3k FUEL STORAGE BLADDERS (†) FUELING SYSTEM (†) AERIAL BULK FUEL DELIVERY SYSTEM (ABFDS) / AGILE FUELING SYSTEM (†) AERIAL BULK FUEL DELIVERY SYSTEM (ABFDS) / AGILE FUELING SYSTEM (†) FUELS PUMPING & DISTRIBUTION HOSE LINE OPERATIONAL FSE FUNDING (†) (NON-WRM ASSETS) OPERATIONAL FSE FUNDING (†) (NON-WRM ASSETS) OPERATIONAL FSE FUNDING (†) (NON-WRM ASSETS) 10 K All Terrain Berm Storage System (†) 10 K All Terrain Berm Storage System (†) 10 K All Terrain Berm Storage System (†) 50K All Terrain Berm Storage System (†) LI 845550 - Fuels Support Equipment (FSE) Air Force Location of PCO UNCLASSIFIED Page 7 of 14 Award Date Date of First Delivery P-1 Line #60 Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date Volume 1 - 737 === page 774 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 Cost Elements 50K All Terrain Berm Storage System (†) 50K All Terrain Berm Storage System (†) 210K All Terrain Berm Storage System (†) 210K All Terrain Berm Storage System (†) (†) 10K Fuel Bladders (†) 10K Fuel Bladders (†) 10K Fuel Bladders (†) 50K Fuel Bladders (†) 50K Fuel Bladders (†) 50K Fuel Bladders 210K Fuel Bladders (†) 210K Fuel Bladders (†) 210K Fuel Bladders (†) FLUID POWERED ADDITIVE (†) INJECTOR CART FLUID POWERED ADDITIVE (†) INJECTOR CART FLUID POWERED ADDITIVE (†) INJECTOR CART R19 Fuel Separator Unit (†) R19 Fuel Separator Unit (†) R19 Fuel Separator Unit (†) O O C P-1 Line Item Number / Title: 845550 / Fuels Support Equipment (FSE) Item Number / Title [DODIC]: Fuels Support Equipment (FSE) FY Contractor and Location Method/Type or Funding Vehicle 2026 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Dec 2025 Mar 2026 12 0.082 Y 2027 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Feb 2027 Apr 2027 75 0.084 Y 2026 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Sep 2025 Oct 2025 12 0.151 Y 2027 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Nov 2026 Jan 2027 71 0.155 Y 2025 TBD / TBD TBD AFLCMC/WN - Agile Combat Systems Feb 2025 May 2025 15 0.012 Y 2026 SRC / Various Various AFLCMC/WN - Agile Combat Systems Sep 2025 Oct 2025 11 0.013 Y 2027 SRC / Various Various AFLCMC/WN - Agile Combat Systems Dec 2026 Mar 2027 42 0.016 Y 2025 TBD / TBD TBD AFLCMC/WN - Agile Combat Systems Mar 2025 May 2025 23 0.047 Y 2026 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Mar 2026 Jun 2026 23 0.048 Y 2027 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Jan 2027 Mar 2027 89 0.032 Y 2025 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Sep 2025 Dec 2025 46 0.090 Y 2026 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Mar 2026 May 2026 13 0.092 Y 2027 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Jan 2027 Mar 2027 28 0.095 Y 2025 DLA / DLA MIPR AFLCMC/WN - Agile Combat Systems Sep 2025 Dec 2025 3 0.105 Y 2026 DLA / DLA MIPR AFLCMC/WN - Agile Combat Systems Mar 2026 Jun 2026 10 0.108 Y 2027 DLA / Virginia MIPR AFLCMC/WN - Agile Combat Systems Dec 2026 Jan 2027 38 0.111 Y 2025 SRC / Various Various AFLCMC/WN - Agile Combat Systems Mar 2025 Apr 2025 3 0.170 Y 2026 SRC / Various Various AFLCMC/WN - Agile Combat Systems Mar 2026 Apr 2026 4 0.175 Y 2027 SRC / Various Various AFLCMC/WN - Agile Combat Systems Jan 2027 Mar 2027 9 0.180 Y LI 845550 - Fuels Support Equipment (FSE) Air Force Location of PCO UNCLASSIFIED Page 8 of 14 Award Date Date of First Delivery P-1 Line #60 Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date Volume 1 - 738 === page 775 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 O O C Cost Elements FORCE SERVICING (RC) (†) FORCE SERVICING (RC) (†) FORCE SERVICING (RC) (†) (†) FORCE SERVICING (SC) R18 FUEL PUMPIMG (†) ASSEMBLY R18 FUEL PUMPIMG (†) ASSEMBLY R18 FUEL PUMPIMG (†) ASSEMBLY R20 SERVICING PLATFORM R20 SERVICING PLATFORM (†) PMU 27 PUMP (†) PMU 27 PUMP (†) PMU 27 PUMP (†) JOINT SPOKE REFUELER (†) JOINT SPOKE REFUELER (†) P-1 Line Item Number / Title: 845550 / Fuels Support Equipment (FSE) Item Number / Title [DODIC]: Fuels Support Equipment (FSE) FY Contractor and Location Method/Type or Funding Vehicle 2025 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Sep 2025 Dec 2025 2 0.373 Y 2026 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Mar 2026 May 2026 1 0.384 Y 2027 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Oct 2026 Dec 2026 4 0.396 Y 2026 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Jan 2026 Apr 2026 1 0.500 Y 2025 SRC / Virginia MIPR AFLCMC/WN - Agile Combat Systems Apr 2025 Jun 2025 6 0.242 Y 2026 SRC / Virginia MIPR AFLCMC/WN - Agile Combat Systems Dec 2025 Mar 2026 4 0.249 Y 2027 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Feb 2027 Apr 2027 15 0.256 Y 2025 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Jan 2025 Mar 2025 1 0.360 Y 2027 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Apr 2027 Jun 2027 6 0.382 Y 2025 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Sep 2024 Nov 2024 4 0.146 Y 2026 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Sep 2025 Nov 2025 6 0.150 Y 2027 SRC / Various MIPR AFLCMC/WN - Agile Combat Systems Feb 2027 Apr 2027 10 0.155 Y 2026 TBD / Various MIPR AFLCMC/WN - Agile Combat Systems Feb 2026 Apr 2026 19 0.375 Y 2027 TBD / Various MIPR AFLCMC/WN - Agile Combat Systems Dec 2026 Feb 2027 25 0.366 Y Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date indicates the presence of a P-21 LI 845550 - Fuels Support Equipment (FSE) Air Force UNCLASSIFIED Page 9 of 14 P-1 Line #60 Volume 1 - 739 === page 776 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 845550 / Fuels Support Equipment (FSE) Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Fuels Support Equipment (FSE) Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 3k FUEL STORAGE BLADDERS 1 2025 AF 24 0 24 1 2026 AF 12 0 12 A - - - - 3 3 3 3 3 3 3 3 12 0 2 2027 AF 35 0 35 35 AERIAL BULK FUEL DELIVERY SYSTEM (ABFDS) / AGILE FUELING SYSTEM 3 2025 AF 11 0 11 3 2026 AF 32 0 32 4 2027 AF 52 0 52 A - - - - - 1 1 1 1 2 3 2 A - 0 32 52 OPERATIONAL FSE FUNDING (NON-WRM ASSETS) 5 2025 AF 1 0 1 5 2026 AF 1 0 1 A - - 1 0 1 6 2027 AF 1 0 1 1 10 K All Terrain Berm Storage System 7 2025 AF 18 0 18 8 2026 AF 7 0 7 A - - - 1 2 2 2 2 9 7 8 2027 AF 62 0 62 62 50K All Terrain Berm Storage System 2025 AF 44 0 44 10 2026 9 AF 12 0 12 A - - - 5 5 5 5 6 6 6 12 6 10 2027 AF 75 0 75 75 210K All Terrain Berm Storage System 11 2026 AF 12 0 12 11 2027 AF 71 0 71 A - 12 71 10K Fuel Bladders 12 2025 AF 15 0 15 13 2026 AF 11 0 11 13 2027 AF 42 0 42 A - - - 2 2 2 2 3 A - 4 11 42 50K Fuel Bladders 14 2025 AF 23 0 23 15 2026 AF 23 0 23 A - - 2 2 2 2 2 13 23 15 2027 AF 89 0 89 89 46 0 46 210K Fuel Bladders 16 2025 AF A O C T N O V LI 845550 - Fuels Support Equipment (FSE) Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 14 S E P O C T N O V D E C J A N F E B P-1 Line #60 M A R A P R M A Y J U N J U L A U G 46 S E P Volume 1 - 740 === page 777 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 845550 / Fuels Support Equipment (FSE) Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Fuels Support Equipment (FSE) Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 16 2026 AF 13 0 13 13 16 2027 AF 28 0 28 28 FLUID POWERED ADDITIVE INJECTOR CART 17 2025 AF 3 0 3 17 2026 AF 10 0 10 A - 10 3 18 2027 AF 38 0 38 38 R19 Fuel Separator Unit 19 2025 AF 3 0 3 19 2026 AF 4 0 4 A - 1 1 1 0 4 19 2027 AF 9 0 9 9 FORCE SERVICING (RC) 20 2025 AF 2 0 2 20 2026 AF 1 0 1 A - 2 1 20 2027 AF 4 0 4 4 1 0 1 1 FORCE SERVICING (SC) 21 2026 AF R18 FUEL PUMPIMG ASSEMBLY 22 2025 AF 6 0 6 22 2026 AF 4 0 4 A - - 1 1 2 2 0 4 23 2027 AF 15 0 15 15 PMU 27 PUMP 24 2025 AF 4 0 4 24 2026 AF 6 0 6 A - - 1 1 1 1 0 24 2027 AF 10 0 10 10 19 A - 6 JOINT SPOKE REFUELER 25 2026 AF 19 0 19 25 2027 AF 25 0 25 25 O C T N O V LI 845550 - Fuels Support Equipment (FSE) Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 14 S E P O C T N O V D E C J A N F E B P-1 Line #60 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 741 === page 778 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 845550 / Fuels Support Equipment (FSE) Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Fuels Support Equipment (FSE) Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 3k FUEL STORAGE BLADDERS 1 2025 AF 24 24 0 1 2026 AF 12 0 12 2 2027 AF 35 0 35 0 A - 2 2 2 2 2 2 0 A - 7 6 6 6 2 2 2 2 2 0 AERIAL BULK FUEL DELIVERY SYSTEM (ABFDS) / AGILE FUELING SYSTEM 3 2025 AF 11 11 0 3 2026 AF 32 0 32 4 2027 AF 52 0 52 0 3 3 3 3 3 3 3 3 4 4 0 A - - 7 7 7 7 6 6 6 6 0 OPERATIONAL FSE FUNDING (NON-WRM ASSETS) 5 2025 AF 1 1 0 5 2026 AF 1 0 1 6 2027 AF 1 0 1 0 A - 1 0 A - - - - - 1 0 10 K All Terrain Berm Storage System 7 2025 AF 18 9 9 8 2026 AF 7 0 7 8 2027 AF 62 0 62 3 3 3 0 A - - 1 1 1 2 2 0 A - - 8 8 8 8 8 8 7 7 0 50K All Terrain Berm Storage System 2025 AF 44 38 6 10 2026 9 AF 12 0 12 10 2027 AF 75 0 75 6 0 A - - - 3 3 2 2 2 0 A - - 15 15 15 12 12 12 11 15 15 0 210K All Terrain Berm Storage System 11 2026 AF 12 0 12 11 2027 AF 71 0 71 2 2 2 2 2 2 0 A - - 12 12 0 10K Fuel Bladders 12 2025 AF 15 11 4 2 2 13 2026 AF 11 0 11 2 2 13 2027 AF 42 0 42 0 2 2 2 1 0 A - - - 7 7 7 7 7 7 0 50K Fuel Bladders 14 2025 AF 23 10 13 15 2026 AF 23 0 23 15 2027 AF 89 0 89 46 0 46 2 2 2 2 2 1 1 A - 1 - 0 - 5 6 6 6 0 A - - 15 15 15 15 15 14 0 210K Fuel Bladders 16 2025 AF O C T N O V LI 845550 - Fuels Support Equipment (FSE) Air Force 5 D E C 5 J A N 5 F E B 5 M A R 5 A P R 5 M A Y 5 J U N 5 J U L 6 A U G UNCLASSIFIED Page 12 of 14 0 S E P O C T N O V D E C J A N F E B P-1 Line #60 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 742 === page 779 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 845550 / Fuels Support Equipment (FSE) Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Fuels Support Equipment (FSE) Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT 16 2026 AF 13 0 13 16 2027 AF 28 0 28 Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R A - B A L A N C E Fiscal Year 2027 M A Y J U N - 2 J U L 2 Calendar Year 2027 A U G 2 S E P 2 O C T 2 N O V D E C 2 J A N F E B M A R A P R M A Y J U N J U L A U G S E P 1 0 A - - 4 4 4 4 4 4 4 0 FLUID POWERED ADDITIVE INJECTOR CART 17 2025 AF 3 0 3 17 2026 AF 10 0 10 18 2027 AF 38 0 38 - - 1 1 1 0 A - - - 2 2 2 2 2 0 A - 6 7 6 6 6 6 1 0 R19 Fuel Separator Unit 19 2025 AF 3 3 0 19 2026 AF 4 0 4 19 2027 AF 9 0 9 0 A - 1 1 1 1 0 A - - 2 2 1 1 1 1 1 0 FORCE SERVICING (RC) 20 2025 AF 2 0 2 20 2026 AF 1 0 1 20 2027 AF 4 0 4 1 0 1 - - 1 1 0 A - - 1 0 A - - 1 1 1 1 0 FORCE SERVICING (SC) 21 2026 AF A - - - - - 1 0 R18 FUEL PUMPIMG ASSEMBLY 22 2025 AF 6 6 0 22 2026 AF 4 0 4 23 2027 AF 15 0 15 0 A - 1 1 1 1 0 A - - 3 3 3 3 3 0 PMU 27 PUMP 24 2025 AF 4 4 0 24 2026 AF 6 0 6 24 2027 AF 10 0 10 0 - 2 2 2 0 A - - 2 2 2 2 1 4 4 3 3 3 1 0 JOINT SPOKE REFUELER 25 2026 AF 19 0 19 25 2027 AF 25 0 25 A - - 4 3 3 3 3 3 0 A - O C T N O V LI 845550 - Fuels Support Equipment (FSE) Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 14 S E P O C T N O V D E C J A N 4 F E B P-1 Line #60 4 M A R A P R M A Y J U N J U L A U G 0 S E P Volume 1 - 743 === page 780 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 845550 / Fuels Support Equipment (FSE) Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: Fuels Support Equipment (FSE) Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 2 40 60 1 TBD - TBD 2 Various - Various 3 TBD - TBD 4 Various - Various 2 40 60 5 TBD - TBD 6 Various - Various 1 1 1 7 TBD - TBD 8 DLA - Virginia 2 40 70 9 TBD - TBD ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 0 0 0 0 0 0 0 0 0 0 0 0 1 3 1 4 0 0 0 0 0 0 0 0 0 0 0 0 1 3 2 5 0 0 0 0 0 0 0 0 0 0 0 0 1 2 5 7 0 0 0 0 0 0 0 0 1 0 0 0 1 2 2 4 0 0 0 0 0 0 0 0 10 DLA - Virginia 1 35 80 0 0 0 0 1 5 2 7 11 DLA - Virginia 2 40 80 0 0 0 0 1 2 2 4 0 0 0 0 0 0 0 0 0 0 0 0 1 3 3 6 0 0 0 0 0 0 0 0 12 TBD - TBD 13 SRC - Various 2 25 50 14 TBD - TBD 15 DLA - Virginia 5 50 90 0 0 0 0 1 4 2 6 16 SRC - Various 2 20 50 0 0 0 0 1 4 2 6 0 0 0 0 0 0 0 0 17 DLA - DLA 18 DLA - Virginia 2 20 40 0 0 0 0 1 3 1 4 19 SRC - Various 1 10 20 0 0 0 0 1 4 2 6 20 SRC - Various 2 10 15 0 0 0 0 1 1 2 3 21 SRC - Various 1 8 16 0 0 0 0 1 4 3 7 0 0 0 0 0 0 0 0 22 SRC - Virginia 23 SRC - Various 1 20 30 0 0 0 0 1 5 2 7 24 SRC - Various 1 6 12 0 0 0 0 1 5 2 7 25 TBD - Various 1 12 35 0 0 0 0 1 3 2 5 Remarks: Requirements are subject to change based on shifts in Department of War and Air Force priorities, operational requirements in the year of execution, contracts, and supply chain fluctuations. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 845550 - Fuels Support Equipment (FSE) Air Force UNCLASSIFIED Page 14 of 14 P-1 Line #60 Volume 1 - 744 === page 781 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 845990 / Base Maintenance and Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 5: Base Support Equipment ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0202834F Other Related Program Elements: 0202834F Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Procurement Quantity (Units in Each) - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 58.105 97.431 68.127 - 68.127 67.726 73.564 79.371 80.957 - Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 58.105 97.431 68.127 - 68.127 67.726 73.564 79.371 80.957 - Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 58.105 97.431 68.127 - 68.127 67.726 73.564 79.371 80.957 - Total 525.281 525.281 525.281 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: In direct support of the Secretary of War's direction to increase readiness across the Department of War, efforts within this Program Element Code (PEC) will be prioritized in alignment with the National Defense Authorization Act (NDAA), U.S. Air Force Force Design, Agile Combat Employment (ACE), and the Defense Planning Guidance (DPG). This portfolio program provides a wide variety of base support equipment items with worldwide application. Equipment includes, but is not limited to, Aircraft Arresting Systems (AAS), Base Logistics and Support Equipment (BLSE), Tools and Industrial Plant Equipment, Cargo Pallet and Net Systems, Base Generator Power Systems, and Deployable Debrief Facilities (DDF). This equipment provides prime support for all base missions. Lack of funding for these equipment items limits safe flight operations, aircraft maintenance and testing capabilities, anti-terrorism and security missions, communications capabilities, and the ability of Air Force units to meet deployment requirements. In direct support of SecWars direction to increase readiness across the DoW, efforts within this PEC will be prioritized based on the National Defense Authorization Act (NDAA), USAF Force Design, Agile Combat Employment (ACE), and the Defense Planning Guide (DPG). These efforts will support work and collaboration efforts across the Combat Readiness Directorate in PE's 78051F, 71212F, 72833F, 64706F, 65827F, 22834F, 52834F, 52844F, 28031F, 41135F and 27521F) -- to increase readiness across the Air Force Enterprise Funding for this exhibit contained in the following program elements: 0101110F, 0207521F, 0202834F, 0502834F, 0502844F, 0802834F, 0901279F. LI 845990 - Base Maintenance and Support Equipment Air Force UNCLASSIFIED Page 1 of 6 P-1 Line #61 Volume 1 - 745 === page 782 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 845990 / Base Maintenance and Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 5: Base Support Equipment ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0202834F Other Related Program Elements: 0202834F Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Base Maintenance and Support Equipment P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a B MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 58.105 - / 97.431 - / 68.127 - / - - / 68.127 - / - - / 58.105 - / 97.431 - / 68.127 - / - - / 68.127 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY27 will procure the following: Aircraft Arresting Systems (AAS): AAS are critical to safe flight operations and directly support USAF F-15, F-16, F-22, F-35, USN, and allied partner fighter aircraft equipped with a tailhook system. These systems are critical during an aborted take-off, In-Flight Emergency, or hydraulic/brake failures. AAS including but is not limited to Barrier Arresting Kit (BAK) BAK-14M Mobile Aircraft Arresting Systems (MAAS), and Type-H. AAS are required for all base and forward deployed operations, enabling the execution of the National Defense Strategy. Cargo Pallets and Nets (SE&V): Cargo Pallets & Nets provide an expedient means of loading and unloading cargo on transport aircraft across the DoW. Pallets & Nets also secure cargo to maintain aircraft balance which is crucial to safety of flight. 661 users across the DoW rely on Pallets & Nets to carry out their primary mission, through which capability and equipment are transported to all parts of the globe, enabling the execution of our National Defense Strategy. Small Munitions Trailers, Aircraft Engine Trailers (SE&V): These trailer programs support the loading, moving and shipping of all numerous verities of Munitions and aircraft Engines. Small Munitions Trailers program provides trailers (and associated accessories) capable of carrying up to 15,000 lbs of conventional munitions and up to 5,500 lbs of nuclear munitions in direct support to aircraft operations. These trailers carry bombs, missiles (Air-to-Air and Air-to-Ground), all calibers of ammunition, all countermeasures all decoys and practice bombs. Small Munitions Trailers directly support B-1, B-2, B-52, A-10, F-15, F16, F-22, C-5, C-17, C-130, AC-130, KC-46, KC-10 and KC-135 rated to carry munitions as cargo. The existing 40+ year old trailers have significant reliability and obsolescence issues as well as high overhaul repair costs. Currently, the cost to complete a depot overhaul of a legacy munition trailer is nearly twice the estimated procurement cost of a new trailer. Base Logistics and Support Equipment (BLSE) (SE&V): BLSE is critical to safe flight operations and necessary for in-garrison and forward deployed locations. If equipment is not readily available, it can cause mission stoppage and severe degradation of operations. BLSE includes, but is not limited to, Flightline Fire Extinguishers, Hydraulic Rescue and Salvaging Kits, Fuel Tank Seal Kits, Automatic Gas Alarms, Restricted Area Anti-Intrusion Alarms, Self-Contained Breathing Apparatus, High Pressure Storage Tanks, Pipeline Repair Kits and Concrete Mixing Plants. Base Calibration Standards (equipment) (AFMETCAL): Funds calibration standards (equipment) for the Air Force Primary Standards Laboratory and 65 Precision Measurement Laboratories (PMEL) AF wide. These standards ensure PMEL measurements are traceable through the AFPSL to the National Institute of Standards and Technology. This traceability is critical to safety-of flight and sustainment of all AF weapon systems/base ops to include vehicle ops, communications, civil engineering, biomedical, and mobility TMDE. Enabling support for over 673k TMDE items for airlift, fighter, missile, nuclear deterrence, and cyber defense missions. LI 845990 - Base Maintenance and Support Equipment Air Force UNCLASSIFIED Page 2 of 6 P-1 Line #61 Volume 1 - 746 === page 783 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 845990 / Base Maintenance and Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: Base Maintenance and Support Equipment MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 58.105 97.431 68.127 - 68.127 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 58.105 97.431 68.127 - 68.127 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 58.105 97.431 68.127 - 68.127 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Base Logistics Support Equipment Cost Recurring Cost AF - - - - - 5.455 - - 5.561 - - 5.808 - - - - - 5.808 AFR - - - - - 0.107 - - 0.109 - - 0.113 - - - - - 0.113 ANG - - - - - 1.674 - - 4.710 - - 8.334 - - - - - 8.334 Subtotal: Recurring Cost - - - - - 7.236 - - 10.380 - - 14.255 - - - - - 14.255 Subtotal: Hardware - Base Logistics Support Equipment Cost - - - - - 7.236 - - 10.380 - - 14.255 - - - - - 14.255 Hardware - Calibration Equipment Cost Recurring Cost - - - - - 14.410 - - 14.752 - - 15.371 - - - - - 15.371 Subtotal: Recurring Cost AFMETCAL - - - - - 14.410 - - 14.752 - - 15.371 - - - - - 15.371 Subtotal: Hardware Calibration Equipment Cost - - - - - 14.410 - - 14.752 - - 15.371 - - - - - 15.371 Hardware - Mechanized Material Handling Equipment Cost Recurring Cost AF - - - - - 0.376 - - - - - - - - - - - - ANG - - - - - 2.224 - - - - - - - - - - - - - - - - - 2.600 - - - - - - - - - - - - - - - - - 2.600 - - - - - - - - - - - - Subtotal: Recurring Cost Subtotal: Hardware Mechanized Material Handling Equipment Cost LI 845990 - Base Maintenance and Support Equipment Air Force UNCLASSIFIED Page 3 of 6 P-1 Line #61 Volume 1 - 747 === page 784 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 845990 / Base Maintenance and Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: Base Maintenance and Support Equipment MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - MHU-110/141 Cost Recurring Cost AF - - - - - European Deterrence Initiative 17.388 - - - - - - Subtotal: Recurring Cost - - - - - 1.267 - - 18.655 - - - - - - 18.655 Legacy Pallet - - Top Net - - - - - - - - - - - - Next Gen Pallet - - - Subtotal: Recurring Cost - - Subtotal: Hardware - Pallet & Net Cost - Subtotal: Hardware MHU-110/141 Cost 12.130 - - 12.689 - - - - - - - - - 12.130 - - - 12.130 8.526 0.002 5,500 1.845 0.001 2,983 - 3.773 0.001 - - - - - - - - - 12.689 - - - - - - - - - 12.689 - - - - - 12.689 - - 12.689 - - - - - 12.689 13.312 0.003 4,490 13.635 - - - 0.003 4,490 13.635 2.983 0.001 2,697 2.697 - - - 0.001 2,697 2.697 5,823 5.823 0.001 6,290 6.290 - - - 0.001 6,290 6.290 - - 0.000 - - - - - - - - - 14.144 - - 22.118 - - 22.622 - - - - - 22.622 - 14.144 - - 22.118 - - 22.622 - - - - - 22.622 Hardware - Pallet & Net Cost Recurring Cost (†) Low Profile Net (†) Hardware - Power Conditioning Equipment Cost Recurring Cost AF - - - - - 0.122 - - 0.000 - - - - - - - - - ANG - - - - - 0.928 - - 0.000 - - - - - - - - - Subtotal: Recurring Cost - - - - - 1.050 - - 0.000 - - - - - - - - - Subtotal: Hardware - Power Conditioning Equipment Cost - - - - - 1.050 - - 0.000 - - - - - - - - - Weigh in Motion System - - - - - - - - 10.000 - - - - - - - - - Subtotal: Recurring Cost - - - - - - - - 10.000 - - - - - - - - - Subtotal: Hardware - Project Kinetic Cargo Cost - - - - - - - - 10.000 - - - - - - - - - Hardware - Project Kinetic Cargo Cost Recurring Cost Hardware - Base Maintenance and Support Equipment Cost Recurring Cost LI 845990 - Base Maintenance and Support Equipment Air Force UNCLASSIFIED Page 4 of 6 P-1 Line #61 Volume 1 - 748 === page 785 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 845990 / Base Maintenance and Support Equipment Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: Base Maintenance and Support Equipment MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Expeditionary UAS manufacturing and employment - - - - - - - - 25.000 - - - - - - - - - Subtotal: Recurring Cost - - - - - - - - 25.000 - - - - - - - - - Subtotal: Hardware - Base Maintenance and Support Equipment Cost - - - - - - - - 25.000 - - - - - - - - - Support - Base Maintenance and Support Equipment Cost BAK-14M Modular Aircraft Arresting System - - - - - - 0.880 2 1.761 0.921 2 1.842 - - - 0.921 2 1.842 Type-H Aircraft Arresting System - - - - - - 0.638 2 1.276 0.666 2 1.333 - - - 0.667 2 1.333 - - - - - - - - 3.037 - - 3.175 - - - - - 3.175 Other Government Charges - - - - - 0.000 - - 0.009 - - 0.005 - - - - - 0.005 Subtotal: Support MHU-110/141 PMA Cost - - - - - 0.000 - - 0.009 - - 0.005 - - - - - 0.005 Other Government Charges - - - - - 0.010 - - 0.005 - - 0.010 - - - - - 0.010 Subtotal: Support - Pallet & Net PMA Cost - - - - - 0.010 - - 0.005 - - 0.010 - - - - - 0.010 Gross/Weapon System Cost - - - - - 58.105 - - 97.431 - - 68.127 - - - - - 68.127 Subtotal: Support - Base Maintenance and Support Equipment Cost Support - MHU-110/141 PMA Cost Support - Pallet & Net PMA Cost (†) indicates the presence of a P-5a LI 845990 - Base Maintenance and Support Equipment Air Force UNCLASSIFIED Page 5 of 6 P-1 Line #61 Volume 1 - 749 === page 786 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 5 FY Contractor and Location Legacy Pallet 2026 AAR Manufacturing INC / Cadillac, MI SS / FFP WR/ALC Apr 2026 May 2026 5,500 0.002 Y Legacy Pallet 2027 AAR Manufacturing INC / Cadilac, MI SS / FFP WR/ALC Mar 2026 Apr 2026 4,490 0.003 Y Low Profile Net 2026 TAC Industries / Springfield, OH SS / FFP WR/ALC Jul 2026 Jul 2026 5,823 0.001 Y Low Profile Net 2027 TAC Industries / Springfield, OH SS / FFP WR/ALC Mar 2026 Jun 2026 6,290 0.001 Y LI 845990 - Base Maintenance and Support Equipment Air Force Location of PCO UNCLASSIFIED Page 6 of 6 Award Date Date of First Delivery Item Number / Title [DODIC]: Base Maintenance and Support Equipment Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: 845990 / Base Maintenance and Support Equipment P-1 Line #61 Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($ M) RFP Issue Date Volume 1 - 750 === page 787 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 846070 / DARP RC135 Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 6: Special Support Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0305207F Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 265.544 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) 265.544 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 265.544 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 29.524 30.136 31.496 - 31.496 32.154 32.754 33.379 34.046 - - - - - - - - - - - 29.524 30.136 31.496 - 31.496 32.154 32.754 33.379 34.046 - - - - - - - - - - - 29.524 30.136 31.496 - 31.496 32.154 32.754 33.379 34.046 - Total 489.033 489.033 489.033 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: RC-135 procurement is executed by the Big Safari RC-135 Program Manager and is supported by various contractors. The contractors provide services including Program Depot Maintenance (PDM), prime mission equipment overhaul, special repair activity, in-plant support (sustainment engineering, software engineering, and program management), configuration management, Line Replaceble Unit (LRU) repair, and field service maintenance and training for special operational missions. The RC-135 Program Manager provides the full-range of weapons system management, acquisition oversight, program security and integrated logistics for the RC-135 aircraft, power plant, sensors and associated support and equipment. Due to the rapidly changing global threat environment, the Program Manager has the authority to redirect funding as necessary to meet current stated and emerging Combatant Commander and Intelligence Community (IC) requirements. Funding for this exhibit contained in PE 0305207F. LI 846070 - DARP RC135 Air Force UNCLASSIFIED Page 1 of 5 P-1 Line #63 Volume 1 - 751 === page 788 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 846070 / DARP RC135 Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 6: Special Support Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0305207F Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-3a 1 / DARP Modification (Capability Improvement) P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code A Exhibits Schedule Exhibit Type Title* P-3a 1 / DARP Modification (Capability Improvement) P-40 Total Gross/Weapon System Cost Subexhibits ID CD A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 265.544 - / 29.524 - / 30.136 - / 31.496 - / 265.544 - / 29.524 - / 30.136 - / 31.496 - / 0.000 - / - - / 31.496 / 31.496 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 32.154 - / 32.754 - / 33.379 - / 34.046 - / - - / 489.033 - / 32.154 - / 32.754 - / 33.379 - / 34.046 - / - - / 489.033 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 procurement funding acquires and installs various upgrade and enhancement modifications for ground support equipment associated with the RC-135 program. This ground support equipment is directly tied to fielded baselines of the RC-135 V/W RIVET JOINT, RC-135S COBRA BALL, and the RC-135U COMBAT SENT. The requirement to maintain commonality with fielded baselines necessitates the continuous modification and installation of upgrades concurrent with RC-135 aircraft entering operational status. These ground systems are critical to the post-mission processing of highly perishable intelligence information, and supporting aircrew proficiency training, virtual simulation exercises that contribute to distributed mission training initiatives, and provide support to indigenous maintenance during aircraft deployments to "bare-base locations. Additionally, all applicable ground support equipment is required to comply with NSA intelligence data recording formats and requirements due to the nature and sensitivity of the information. Ground support equipment includes, but is not limited to: RIVET JOINT Mission Trainer (RJMT), Ground Data Processing System (GDPS), Mission Crew Training System (MCTS), Modular Processing System (MPS), and the Airborne Capability Extension System (ACES). LI 846070 - DARP RC135 Air Force UNCLASSIFIED Page 2 of 5 P-1 Line #63 Volume 1 - 752 === page 789 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 6 P-1 Line Item Number / Title: 846070 / DARP RC135 ID Code (A=Service Ready, B=Not Service Ready) : A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / DARP Modification MDAP/MAIS Code: Prior Years 265.544 265.544 265.544 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 29.524 30.136 31.496 0.000 31.496 32.154 32.754 33.379 34.046 - - - - - - - - - - - 29.524 30.136 31.496 0.000 31.496 32.154 32.754 33.379 34.046 - - - - - - - - - - - 29.524 30.136 31.496 0.000 31.496 32.154 32.754 33.379 34.046 - Total 489.033 489.033 489.033 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: RC-135 procurement is executed by the Big Safari RC-135 Program Manager and is supported by various contractors. The contractors provide services including Program Depot Maintenance (PDM), prime mission equipment overhaul, special repair activity, in-plant support (sustainment engineering, software engineering, and program management), configuration management, LRU repair, and field service maintenance and training for special operational missions. The RC-135 Program Manager provides the full-range of weapons system management, acquisition oversight, program security and integrated logistics for the RC-135 aircraft, power plant, sensors and associated support and equipment. Due to the rapidly changing global threat environment, the Program Manager has the authority to redirect funding as necessary to meet current stated and emerging Combatant Commander and Intelligence Community (IC) requirements. FY 2027 procurement funding acquires and installs various upgrade and enhancement modifications for ground support equipment associated with the RC-135 program. This ground support equipment is directly tied to fielded baselines of the RC-135 V/W RIVET JOINT, RC-135S COBRA BALL, and the RC-135U COMBAT SENT. The requirement to maintain commonality with fielded baselines necessitates the continuous modification and installation of upgrades concurrent with RC-135 aircraft entering operational status. These ground systems are critical to the post-mission processing of highly perishable intelligence information, and supporting aircrew proficiency training, virtual simulation exercises that contribute to distributed mission training initiatives, and provide support to indigenous maintenance during aircraft deployments to "bare-base locations. Additionally, all applicable ground support equipment is required to comply with NSA intelligence data recording formats and requirements due to the nature and sensitivity of the information. Ground support equipment includes, but is not limited to: Ground Data Processing System (GDPS), Mission Crew Training System (MCTS), Modular Processing System (MPS), and the Airborne Capability Extension System (ACES). Milestone/Development Status Fully Fielded Systems LI 846070 - DARP RC135 Air Force UNCLASSIFIED Page 3 of 5 P-1 Line #63 Volume 1 - 753 === page 790 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 846070 / DARP RC135 Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 6 ID Code (A=Service Ready, B=Not Service Ready) : A MDAP/MAIS Code: Models of Systems Affected: RC-135 Related RDT&E PEs: 0305207F Modification Type: Capability Improvement Prior Years Financial Plan Modification Number / Title: 1 / DARP Modification FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: BL Ground Systems A Kits Recurring BL Ground Systems:INSTALL KITS Group A (Active) 9 / 57.441 Subtotal: Recurring - 1 / 6.987 / 57.441 - 1 / 7.226 / 6.987 - / 7.226 - 1 / 7.368 - / - / 7.368 - / - 1 / 7.368 - 1 / 7.463 / 7.368 - 1 / 7.580 / 7.463 - 1 / 7.731 / 7.580 - / 7.731 - 1 / 7.886 - / - 16 / 109.682 / 7.886 - / - - / 109.682 B Kits Recurring 1 / 22.897 - / - 1 / 24.829 - / - 16 / 360.765 Subtotal: Recurring BL Ground Systems:EQUIPMENT Group B (Active) - / 198.304 - / 21.361 - / 21.702 - / 22.897 - / - - / 22.897 - / 23.435 - / 23.894 - / 24.343 - / 24.829 - / - - / 360.765 Subtotal: BL Ground Systems - / 255.745 - / 28.348 - / 28.928 - / 30.265 - / - - / 30.265 - / 30.898 - / 31.474 - / 32.074 - / 32.715 - / - - / 470.447 - / 255.745 - / 28.348 - / 28.928 - / 30.265 - / - - / 30.265 - / 30.898 - / 31.474 - / 32.074 - / 32.715 - / - - / 470.447 Subtotal: Procurement, All Modification Items 9 / 198.304 1 / 21.361 1 / 21.702 1 / 22.897 1 / 23.435 1 / 23.894 1 / 24.343 Installation Modification Item 1 of 1: BL Ground Systems 9 / 9.799 1 / 1.176 1 / 1.208 1 / 1.231 - / - 1 / 1.231 1 / 1.256 1 / 1.280 1 / 1.305 1 / 1.331 - / - 16 / 18.586 Subtotal: Installation 9 / 9.799 1 / 1.176 1 / 1.208 1 / 1.231 - / - 1 / 1.231 1 / 1.256 1 / 1.280 1 / 1.305 1 / 1.331 - / - 16 / 18.586 265.544 29.524 30.136 31.496 0.000 31.496 32.154 32.754 33.379 34.046 - 489.033 Total Total Cost (Procurement + Support + Installation) LI 846070 - DARP RC135 Air Force UNCLASSIFIED Page 4 of 5 P-1 Line #63 Volume 1 - 754 === page 791 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 846070 / DARP RC135 Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 6 ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: 1 / DARP Modification MDAP/MAIS Code: Modification Item 1 of 1: BL Ground Systems Manufacturer Information Manufacturer Name: L3Harris Technologies Manufacturer Location: Greenville, TX Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 6 Dates FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Dec 2024 Dec 2025 Dec 2026 Dec 2027 Dec 2028 Dec 2029 Dec 2030 Delivery Dates Jun 2025 Jun 2026 Jun 2027 Jun 2028 Jun 2029 Jun 2030 Jun 2031 Installation Information Method of Implementation: Contractor Facility Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years 9 / 9.799 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 9 / 9.799 FY 2025 - / - 1 / 1.176 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 1.176 FY 2026 - / - - / - 1 / 1.208 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 1.208 FY 2027 - / - - / - - / - 1 / 1.231 - / - 1 / 1.231 - / - - / - - / - - / - - / - 1 / 1.231 FY 2028 - / - - / - - / - - / - - / - - / - 1 / 1.256 - / - - / - - / - - / - 1 / 1.256 FY 2029 - / - - / - - / - - / - - / - - / - - / - 1 / 1.280 - / - - / - - / - 1 / 1.280 FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - 1 / 1.305 - / - - / - 1 / 1.305 FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - 1 / 1.331 - / - 1 / 1.331 To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total 9 / 9.799 1 / 1.231 - / - 1 / 1.231 1 / 1.331 - / - 1 / 1.176 1 / 1.208 1 / 1.256 1 / 1.280 1 / 1.305 - / - 16 / 18.586 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 9 - 1 - - - 1 - - - 1 - - - 1 - - - 1 - - - 1 - - - 1 - - 0 16 Out 9 - 0 16 - - LI 846070 - DARP RC135 Air Force 1 - - - 1 - - - 1 - - - 1 UNCLASSIFIED Page 5 of 5 - - - 1 - - P-1 Line #63 - 1 - - - 1 Volume 1 - 755 === page 792 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 756 === page 793 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 846080 / DCGS-AF Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 6: Special Support Projects ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0305208F, 0305240F Other Related Program Elements: 0305208F, 0305240F Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 638.645 638.645 638.645 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 51.594 87.044 86.888 88.625 - - - - 86.888 88.625 - - - 51.594 87.044 - - 51.594 87.044 316.157 - - 316.157 - - 316.157 - 316.157 316.157 316.157 458.748 458.748 458.748 835.335 835.335 835.335 To FY 2031 Complete - - - 86.888 88.625 - Total 2,563.036 2,563.036 2,563.036 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Air Force Distributed Common Ground System (AF DCGS) weapon system (AN/GSQ-272) is the Combat Air Force (CAF)'s primary Command and Control, Intelligence, Surveillance, and Reconnaissance (C2ISR) node providing global orchestration, sense-making, tailored analysis (battlespace awareness, battlespace characterization, and targetable custody) at speed and scale to support C2-intel teaming and decision advantage across the competition continuum. The AF DCGS mission is to provide Joint Task Force (JTF) Commanders, Joint and Combined Air Component Commanders (JFACC/CFACC), Combatant Commands, and other-directed organizations with global, time-sensitive Intelligence, Surveillance and Reconnaissance (ISR) data and fused multi-Intelligence (Multi-INT) products across the continuum of conflict. The AF DCGS weapon system provides capabilities required to connect, direct, and exploit sensors, as well as transform the vast array of multi-source/multi-domain data from available ISR sensors/sources into actionable intelligence to find, fix, track and inform targeting of adversary forces and enable simultaneous kill chains. AF DCGS is also a major component of the DoW intelligence infrastructure and the AF's primary intelligence sense-making element and critical enabler for the Department of the Air Force (DAF) Battle Network. AF DCGS leveraging its robust, resilient transport and resilient, distributed cloud architecture to ensure survivable Command and Control (C2), robust communication capabilities, and rapid sensor integration to meet C/JFACC's operational objectives. AF DCGS is a Multi-INT, federated weapon system capable of exploiting intelligence data from manned platforms, Remotely Piloted Aircraft (RPA), non-traditional ISR platforms, national and commercial satellites, and other collection systems. AF DCGS, as the primary C2ISR node, has access to a multitude of sensors and data across the Intelligence Community, to include Publicly Available Information (PAI). AF DCGS Analysts use Artificial Intelligence (AI)/Machine Learning (ML), Automation and Augmentation (AAA) technologies to automate and focus their review/analysis of multi-source/multi-domain intelligence across the tactical/national sensor grid and within federated databases to enable target and problem centric, sensor-agnostic analysis and exploitation to address joint operational requirements. AF DCGS provides time-dominant and tailored fused intelligence to meet Air Operations Center (AOC) and targeting mission requirements and supports sensor to shooter and the kill chain activities across the continuum of conflict. The DCGS analysts use all available data sources and emerging capabilities to enhance their understanding of intelligence/targeting problem sets and provide the required intelligence. AF DCGS is a regionally aligned, globally networked ISR enterprise composed of eight core sites (two active duty OCONUS, three active duty CONUS and three Air National Guard CONUS), six SIGINT Distributed Mission Sites (four collocated with National Mission Partner sites), three Air National Guard full-motion video sites, and four integration and test environments connected by robust, resilient communications infrastructure. AF DCGS currently supports ongoing operations from in-garrison CONUS and OCONUS-based locations. AF DCGS' open, resilient, distributed cloud architecture enables the rapid incorporate modern technologies and tools, new/improved sensor capabilities, and GEOINT, SIGINT and multi-INT mission applications to meet emerging and urgent operational needs. Additionally, DCGS conforms with USW(I&S)'s efforts to improve data sharing through its Common Data Fabric (CDF), as well as the Space Force's efforts with LI 846080 - DCGS-AF Air Force UNCLASSIFIED Page 1 of 16 P-1 Line #64 Volume 1 - 757 === page 794 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 6: Special Support Projects ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: 846080 / DCGS-AF Program Elements for Code B Items: 0305208F, 0305240F Other Related Program Elements: 0305208F, 0305240F Line Item MDAP/MAIS Code: N/A its Unified Data Library (UDL). AF DCGS integrates commercial-off-the-shelf and government-off-the-shelf services and applications to fulfill operational requirements and data sharing requirements across the DoW DCGS community. In FY 2026, AF DCGS transitioned to one Software Acquisition Pathway (SWP) program (encompassing Mission Applications, Mission Data Services, and DCGS Operations Integration and Transformation) and maintained a single ACAT III for Network Infrastructure Transformation (NIT). Leveraging SWP for software-centric capabilities allows the program to be more responsive to warfighter requirements, streamlining acquisition processes to enable swift integration of emerging technologies and accelerated fielding of minimum viable products. Funding for this exhibit Line Item # 846080 is contained in PEs 0305208F and 0305240F. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. This modification supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Program Management Administration (PMA): FY 2027 funding permits the Program Management Office (PMO) to support the fielding and installation of new and developing capabilities. This includes the initial bed down and operability testing, technical interchange meetings, and events incident to fielding both hardware and software products, and maintaining configuration control of fielded products. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. LI 846080 - DCGS-AF Air Force UNCLASSIFIED Page 2 of 16 P-1 Line #64 Volume 1 - 758 === page 795 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 846080 / DCGS-AF Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 6: Special Support Projects ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0305208F, 0305240F Other Related Program Elements: 0305208F, 0305240F Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD P-3a 1 / AF DCGS SWP Program (Reliability & Maintainability) B P-3a 3 / Network Infrastructure Transformation (Reliability & Maintainability) B P-3a 1 / ISR Transport (Reliability & Maintainability) B P-3a 2 / ISR Transport and Processing (Reliability & Maintainability) B P-40 Total Gross/Weapon System Cost MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code / - - / 138.897 - / - - / - - / 9.253 - / 23.790 - / 0.000 - / 12.259 - / 39.479 - / 60.436 - / 0.000 - / 60.436 / - - / 190.200 - / 0.000 - / 190.200 - / - - - / 288.333 - / 34.840 - / 38.312 - / 41.731 - / 638.645 - / 51.594 - / 87.044 - / 316.157 - / 23.790 / 0.000 - / 41.731 / - - / 316.157 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-3a 1 / AF DCGS SWP Program (Reliability & Maintainability) B - / 18.913 - / 12.813 - / 9.600 - / 9.600 - / - - / 83.969 P-3a 3 / Network Infrastructure Transformation (Reliability & Maintainability) B - / 64.835 - / 72.522 - / 77.288 - / 79.025 - / - - / 544.741 P-3a 1 / ISR Transport (Reliability & Maintainability) B - / 375.000 - / 750.000 - / 0.000 - / 0.000 - / - P-3a 2 / ISR Transport and Processing (Reliability & Maintainability) B / 0.000 - / 0.000 - / 0.000 - / - P-40 Total Gross/Weapon System Cost / 835.335 - / 86.888 - / 88.625 - / - - / 0.000 / 458.748 - - / 1,315.200 - - / 403.216 / 2,563.036 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: This program, PE 0305240F DCGS-AF, P-3A Mod ISR Transport and Processing 2, ISR Transport, is a new start. Where applicable, justification for individual modifications is provided in the P-3A exhibits. LI 846080 - DCGS-AF Air Force UNCLASSIFIED Page 3 of 16 P-1 Line #64 Volume 1 - 759 === page 796 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 6 P-1 Line Item Number / Title: 846080 / DCGS-AF ID Code (A=Service Ready, B=Not Service Ready) : B Resource Summary Modification Number / Title: 1 / AF DCGS SWP Program MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - - 9.253 23.790 0.000 23.790 18.913 12.813 9.600 9.600 - 83.969 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - - 9.253 23.790 0.000 23.790 18.913 12.813 9.600 9.600 - 83.969 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - - 9.253 23.790 0.000 23.790 18.913 12.813 9.600 9.600 - 83.969 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Delivers mission-critical, end-user software applications required for analysts' global orchestration, sense-making, tailored analysis (battlespace awareness, battlespace characterization, and targetable custody) and data dissemination of a multitude of sensor data via Mission Applications, Mission Data Services, and Operations Integration & Transformation sections. The Software Acquisition Pathway (SWP) rapidly procures, integrates, tests, evaluates and fields new and updated GEOINT, SIGINT, & Multi-INT capabilities by leveraging Commercial off-the-Shelf (COTS)/Government off-the-Shelf (GOTS) Software, Spares, and Interim Contractor Support (ICS); enables quick/seamless integration of new sensors, data types, sensor planning, and Command and Control (C2) capabilities; and provides data link visualization capabilities on to the Air Force Distributed Common Ground System (AF DCGS) resilient, distributed cloud architecture (private on-premises and/or commercial cloud environments) to meet mission assured requirements. Breakout of categories under Software Acquisition Pathway are included below: Mission Applications - GEOINT efforts include procurement, and integration of sensor C2, planning, and management; mission management; GEOINT high-altitude and full motion video (FMV) processing, exploitation and workflow capabilities; and product dissemination to support DCGS analysts' global orchestration, sense-making, tailored analysis (battlespace awareness, battlespace characterization, and targetable custody) and integration and dissemination of a multitude of sensor data tasks, as well as the integration cyber security mandates and support to program Zero Trust efforts. Mission Applications - SIGINT efforts include procurement and integration of sensor C2, planning, and management; mission management; sensor data emulator; SIGINT processing, exploitation and workflow capabilities; and product dissemination to support DCGS analysts' global orchestration, sense-making, tailored analysis (battlespace awareness, battlespace characterization, and targetable custody) and integration of a multitude of sensor data tasks, as well as the integration cyber security mandates and support to program Zero Trust efforts. Mission Data Services efforts include procurement and integration of new and modernization of, voice and chat communications, collaboration, and situational awareness; Multi-INT tailored analytic capabilities; enterprise services and core shared services to include cross domain solutions; enterprise service bus data exchange and interoperability capabilities, ArcGIS common production environment/ disposition of forces initiatives as well as the integration cyber security mandates and support to program Zero Trust efforts. Ops Integration and Transformation efforts include management and funding for AF DCGS Dev/Sec/Ops Continuous Integration/Continuous Delivery (CI/CD) environment and agile software development, test, integration and deployment activities. CI/CD leverages both commercial cloud and on premises infrastructure. Funds and manages program office test and evaluation activities and Enterprise Cloud Test Environment. Manages and integrates Zero Trust solutions. Justification: FY 2027 Funding will: Mission Applications: LI 846080 - DCGS-AF Air Force UNCLASSIFIED Page 4 of 16 P-1 Line #64 Volume 1 - 760 === page 797 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 6 P-1 Line Item Number / Title: 846080 / DCGS-AF ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: 1 / AF DCGS SWP Program MDAP/MAIS Code: - Procure, integrate, test and field new and updated GEOINT capabilities on DCGS resilient, distributed cloud architecture (private on-premises and/or commercial cloud environments) to connect, direct, and exploit sensors, as well as transform the vast array of multi-source/multi-domain data from available ISR sensors/sources into actionable intelligence to find, fix, track and inform targeting of adversary forces and enable simultaneous kill chains - Procure, integrate, test and field new and updated capabilities to GEOINT-specific High Altitude (HA) and Full Motion Video (FMV) operational (workflow, exploitation, etc.) capabilities - Procure, integrate, test and field new and updated sensor agnostic ingest, management, planning and emulator capabilities - Procure , integrate, test and field new and updated SIGINT capabilities on DCGS resilient, distributed cloud architecture (private on-premises and/or commercial cloud environments) connect, direct, and exploit sensors, as well as transform the vast array of multi-source/multi-domain data from available ISR sensors/sources into actionable intelligence to find, fix, track and inform targeting of adversary forces and enable simultaneous kill chains - Procure, integrate, test and field new and updated capabilities to SIGINT-specific and Analysis and Exploitation Team (AET) operational (workflow, exploitation, etc.) capabilities - Procure, integrate, test and field SIGINT Sensor Data Ingest (SSDI) National Mission Partner Gateway (NMPG) capabilities at additional sites for improved resiliency - Procure, integrate, test and field new and updated sensor agnostic management, planning and emulator capabilities - Procure, integrate, test and field mandated cyber security capabilities/updates Mission Data Services - Procure, integrate, test and field new and updated Enterprise Services, Core Shared Services and Multi-INT capabilities on DCGS resilient, distributed cloud architecture (private on-premises and/or commercial cloud environments) connect, direct, and exploit sensors, as well as transform the vast array of multi-source/multi-domain data from available ISR sensors/sources into actionable intelligence to find, fix, track and inform targeting of adversary forces and enable simultaneous kill chains - Procure, integrate, test and field Raise the Bar Compliant Cross Domain capability - Procure, integrate, test and field new and updated Multi-INT, AAA, multi-INT fusion, and visualization/situational awareness, collaboration and data access capabilities - Procure, integrate, test and field new and updated ArcGIS Common production Environment capabilities - Procure, integrate, test and field new and updated Enterprise Services and Core Shared Services OI&T - Procure security assessor support required for cyber reviews and assessments - Procure test support to complete operational test events - Procure and Integrate Zero Trust solutions to ensure compliance with Zero Trust Policy The funding increase from FY 2026 to FY 2027 of 14.537M is due to support of new and emerging air and space-based sensor efforts to provide required ingest, catalog and exploitation capabilities. Milestone/Development Status AF DCGS is in the Operations and Sustainment phase of the acquisition cycle. The weapon system has reached Full Operational Capability (FOC) and all modifications are being implemented in accordance with AFI 63-101. LI 846080 - DCGS-AF Air Force UNCLASSIFIED Page 5 of 16 P-1 Line #64 Volume 1 - 761 === page 798 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 846080 / DCGS-AF Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 6 ID Code (A=Service Ready, B=Not Service Ready) : B MDAP/MAIS Code: Models of Systems Affected: DCGS Related RDT&E PEs: 0305208F Modification Type: Reliability & Maintainability Prior Years Financial Plan Modification Number / Title: 1 / AF DCGS SWP Program FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) RDT&E PE # 0305208F - / - - / - - / 5.400 - / - - / - - / 6.110 - / - - / - - - / - - / - - - / - - / - - / - - - / - - - / - - / - - / - - / - - / - - / - - / - - / - - / 16.377 - / - - / 16.377 - / 14.913 - / 8.813 - / 5.600 / 6.110 - / 16.377 - / - - / 16.377 - / 14.913 - / 8.813 - / 6.110 - / 16.377 - / - - / 16.377 - / 14.913 - / 8.813 - - / 6.110 - / 16.377 - / - - / 16.377 - / 14.913 - / 8.813 / - - / 3.143 - / 7.413 - / - - / 7.413 - / 4.000 - / - - / 3.143 - / 7.413 - / - - / 7.413 - / 4.000 - / - - / - - / - - / - - / 5.400 - / 5.600 - / - - / 57.413 / 5.600 - / 5.600 - / - - / 57.413 / 5.600 - / 5.600 - / - - / 57.413 - / 5.600 - / 5.600 - / - - / 57.413 / 4.000 - / 4.000 - / 4.000 - / - - / 26.556 / 4.000 - / 4.000 - / 4.000 - / - - / 26.556 / - - / - Procurement Modification Item 1 of 1: DCGS Software Acquisition Pathway B Kits Recurring DCGS Software Acquisition Pathway:EQUIPMENT Group B (Active) Subtotal: Recurring Subtotal: DCGS Software Acquisition Pathway Subtotal: Procurement, All Modification Items Support (All Modification Items) PMA - Contractor Services Subtotal: Support Installation Subtotal: Installation - / - - - / - - / - - / - - / - - - / - Total Total Cost (Procurement + Support + Installation) LI 846080 - DCGS-AF Air Force - - 9.253 23.790 0.000 UNCLASSIFIED Page 6 of 16 23.790 18.913 12.813 P-1 Line #64 9.600 9.600 - 83.969 Volume 1 - 762 === page 799 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 6 P-1 Line Item Number / Title: 846080 / DCGS-AF ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: 1 / AF DCGS SWP Program MDAP/MAIS Code: Modification Item 1 of 1: DCGS Software Acquisition Pathway Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 0 Dates FY 2025 Production Leadtime (in Months): 0 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Org/Intermediate LI 846080 - DCGS-AF Air Force Installation Quantity: 0 UNCLASSIFIED Page 7 of 16 P-1 Line #64 Volume 1 - 763 === page 800 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 6 P-1 Line Item Number / Title: 846080 / DCGS-AF ID Code (A=Service Ready, B=Not Service Ready) : B Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 3 / Network Infrastructure Transformation MDAP/MAIS Code: Prior Years 138.897 138.897 138.897 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 12.259 39.479 60.436 0.000 60.436 64.835 72.522 77.288 79.025 - - - - - - - - - - - 12.259 39.479 60.436 0.000 60.436 64.835 72.522 77.288 79.025 - - - - - - - - - - - 12.259 39.479 60.436 0.000 60.436 64.835 72.522 77.288 79.025 - Total 544.741 544.741 544.741 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Network Infrastructure Transformation: Modernizes and procures the AF DCGS network transport and resilient, distributed architecture (COTS/GOTS Hardware and Software, Spares, Interim Contractor Support (ICS)) to ensure a cyber resilient, open, scalable, commercial-based, architecture, and required data ingest, transfer, and storage capabilities, collaboration, and content driven discovery for critical reference data. AF DCGS Resilient, Distributed Architecture consists of a mix of on-premises infrastructure/private cloud environment and commercial cloud architecture to meet mission-assured requirements. AF DCGS leverages Unclassified, Secret and Top-Secret Air Force commercial cloud environments. Network infrastructure transformation also handles integration of any required ground line of sight capabilities supporting ISR airborne assets as well as ongoing/planned efforts to converge C2/ISR onto federated, digital infrastructure. Justification: FY 2027 funding will - Procure, integrate, test and field updates to the DCGS network transport systems and network/releasable enclave management capabilities - Procure, integrate, test and field updates Resilient, Distributed Architecture environments and end user devices (workstations, etc.) to include the cross domain data access SecureView capability - Procure, integrate, test and field updates, any required uninterrupted power supplies, and line of site capabilities - Procure, integrate, test and field additional connectivity to mission partner capabilities to include theater capabilities - Procure and field any required depot and on-site spares for the above systems/capabilities as well as ensure compliance with cyber security mandates The funding increase from FY 2026 to FY 2027 of $20.957M allows for the procurement and installation of additional resilient distributed architecture infrastructure hardware. Milestone/Development Status AF DCGS is in the Operations and Sustainment phase of the acquisition lifecycle. The weapon system has reached FOC and all modifications are being implemented in accordance with AFI 63-101. LI 846080 - DCGS-AF Air Force UNCLASSIFIED Page 8 of 16 P-1 Line #64 Volume 1 - 764 === page 801 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 846080 / DCGS-AF Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 6 ID Code (A=Service Ready, B=Not Service Ready) : B MDAP/MAIS Code: Models of Systems Affected: 0305208F Modification Type: Reliability & Maintainability Prior Years Financial Plan Modification Number / Title: 3 / Network Infrastructure Transformation FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Related RDT&E PEs: FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: Network Infrastructure B Kits Recurring - / 125.290 - / 8.009 - / 33.649 - / 52.856 - / - - / 52.856 - / 57.255 - / 64.942 - / 69.708 - / 71.445 - / - - / 483.154 Subtotal: Recurring Network Infrastructure:EQUIPMENT Group B (Active) - / 125.290 - / 8.009 - / 33.649 - / 52.856 - / - - / 52.856 - / 57.255 - / 64.942 - / 69.708 - / 71.445 - / - - / 483.154 Subtotal: Network Infrastructure - / 125.290 - / 8.009 - / 33.649 - / 52.856 - / - - / 52.856 - / 57.255 - / 64.942 - / 69.708 - / 71.445 - / - - / 483.154 - / 125.290 - / 8.009 - / 33.649 - / 52.856 - / - - / 52.856 - / 57.255 - / 64.942 - / 69.708 - / 71.445 - / - - / 483.154 - Subtotal: Procurement, All Modification Items Support (All Modification Items) PMA - Other Gov't Costs PMA - Contractor Services Subtotal: Support / 0.172 - / 0.080 - / 0.080 - / 0.080 - / - - / 0.080 - / 0.080 - / 0.080 - / 0.080 - / 0.080 - / - - / 13.435 - / 4.170 - / 5.750 - / 7.500 - / - - / 7.500 - / 7.500 - / 7.500 - / 7.500 - / 7.500 - / - - - / 60.855 / 0.732 - / 13.607 - / 4.250 - / 5.830 - / 7.580 - / - - / 7.580 - / 7.580 - / 7.580 - / 7.580 - / 7.580 - / - - / 61.587 / - - / - / - - / - Installation Subtotal: Installation - / - - / - - / - - - / - - / - - / - - / - - - / - Total Total Cost (Procurement + Support + Installation) LI 846080 - DCGS-AF Air Force 138.897 12.259 39.479 60.436 0.000 UNCLASSIFIED Page 9 of 16 60.436 64.835 72.522 P-1 Line #64 77.288 79.025 - 544.741 Volume 1 - 765 === page 802 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 6 P-1 Line Item Number / Title: 846080 / DCGS-AF ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: 3 / Network Infrastructure Transformation MDAP/MAIS Code: Modification Item 1 of 1: Network Infrastructure Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 0 Dates FY 2025 Production Leadtime (in Months): 0 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Org/Intermediate LI 846080 - DCGS-AF Air Force Installation Quantity: 0 UNCLASSIFIED Page 10 of 16 P-1 Line #64 Volume 1 - 766 === page 803 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 6 P-1 Line Item Number / Title: 846080 / DCGS-AF ID Code (A=Service Ready, B=Not Service Ready) : B Resource Summary Modification Number / Title: 1 / ISR Transport MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 0.000 0.000 - - - - 0.000 0.000 - Procurement Quantity (Units in Each) - - - Gross/Weapon System Cost ($ in Millions) - - - Less PY Advance Procurement ($ in Millions) - - - Net Procurement (P-1) ($ in Millions) - - - Plus CY Advance Procurement ($ in Millions) - - - Total Obligation Authority ($ in Millions) - - - 190.200 - 0.000 - 190.200 - 0.000 - 190.200 0.000 190.200 190.200 190.200 375.000 375.000 375.000 750.000 750.000 750.000 To FY 2031 Complete - - - 0.000 0.000 - Total 1,315.200 1,315.200 1,315.200 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: This program, PE 0305240F DCGS-AF, P-3A Mod ISR Transport and Processing 2, ISR Transport, is a new start. Intelligence, Surveillance and Reconnaissance (ITP) Transport is a DoW program for global ISR bi-directional data transport. Detailed information for this effort remains classified and will be provided on a needto-know basis. Milestone/Development Status N/A LI 846080 - DCGS-AF Air Force UNCLASSIFIED Page 11 of 16 P-1 Line #64 Volume 1 - 767 === page 804 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 846080 / DCGS-AF Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 6 ID Code (A=Service Ready, B=Not Service Ready) : B MDAP/MAIS Code: Models of Systems Affected: 0305240F Related RDT&E PEs: 0305240F Modification Type: Reliability & Maintainability Prior Years Financial Plan Modification Number / Title: 1 / ISR Transport FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: ISR Transport B Kits Recurring - / - - / - - / - - / 190.200 - / - - / 190.200 - / 375.000 - / 750.000 - / - - / - - / - - / 1,315.200 Subtotal: Recurring ISR Transport:EQUIPMENT Group B (Active) - / - - / - - / - - / 190.200 - / - - / 190.200 - / 375.000 - / 750.000 - / - - / - - / - - / 1,315.200 Subtotal: ISR Transport - / - - / - - / - - / 190.200 - / - - / 190.200 - / 375.000 - / 750.000 - / - - / - - / - - / 1,315.200 - / - - / - - / - - / 190.200 - / - - / 190.200 - / 375.000 - / 750.000 - / - - / - - / - - / 1,315.200 - / - - / - - / - / - - / - - / - - / - - / - - / - 0.000 190.200 Subtotal: Procurement, All Modification Items Installation Subtotal: Installation - / - - / - - - / - Total Total Cost (Procurement + Support + Installation) LI 846080 - DCGS-AF Air Force - - - 190.200 UNCLASSIFIED Page 12 of 16 375.000 750.000 P-1 Line #64 0.000 0.000 - 1,315.200 Volume 1 - 768 === page 805 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 6 P-1 Line Item Number / Title: 846080 / DCGS-AF ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: 1 / ISR Transport MDAP/MAIS Code: Modification Item 1 of 1: ISR Transport Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 0 Dates FY 2025 Production Leadtime (in Months): 0 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Org/Intermediate LI 846080 - DCGS-AF Air Force Installation Quantity: 0 UNCLASSIFIED Page 13 of 16 P-1 Line #64 Volume 1 - 769 === page 806 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 6 P-1 Line Item Number / Title: 846080 / DCGS-AF ID Code (A=Service Ready, B=Not Service Ready) : B Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 2 / ISR Transport and Processing MDAP/MAIS Code: Prior Years 288.333 288.333 288.333 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - 34.840 38.312 41.731 0.000 41.731 0.000 0.000 0.000 0.000 - - - - - - - - - - - 34.840 38.312 41.731 0.000 41.731 0.000 0.000 0.000 0.000 - - - - - - - - - - - 34.840 38.312 41.731 0.000 41.731 0.000 0.000 0.000 0.000 - Total 403.216 403.216 403.216 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Intelligence, Surveillance and Reconnaissance (ISR) Transport and Processing (ITP) is a DoW program for global ISR bi-directional data transport and processing. Detailed information for this effort remains classified and will be provided on a need-to-know basis. Starting in FY 2028, WSC 846080 DCGS-AF, ISR Transport and Processing efforts were transferred to WSC 834010 General Information Technology. These efforts will return to WSC 846080 DCGS-AF in the FY 2028 PB submission. Milestone/Development Status N/A LI 846080 - DCGS-AF Air Force UNCLASSIFIED Page 14 of 16 P-1 Line #64 Volume 1 - 770 === page 807 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 846080 / DCGS-AF Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 6 ID Code (A=Service Ready, B=Not Service Ready) : B MDAP/MAIS Code: Models of Systems Affected: 0305240F Related RDT&E PEs: 0305240F Modification Type: Reliability & Maintainability Prior Years Financial Plan Modification Number / Title: 2 / ISR Transport and Processing FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: ISR Transport and Processing B Kits Recurring ISR Transport and Processing:EQUIPMENT Group B (Active) Subtotal: Recurring - / 288.333 - / 34.840 - / 38.312 - / 41.731 - / - - / 41.731 - / - - / - - / - - / - - / - - / 403.216 - / 288.333 - / 34.840 - / 38.312 - / 41.731 - / - - / 41.731 - / - - / - - / - - / - - / - - / 403.216 Subtotal: ISR Transport and Processing - / 288.333 - / 34.840 - / 38.312 - / 41.731 - / - - / 41.731 - / - - / - - / - - / - - / - - / 403.216 Subtotal: Procurement, All Modification Items - / 288.333 - / 34.840 - / 38.312 - / 41.731 - / - - / 41.731 - / - - / - - / - - / - - / - - / 403.216 / - - / - / - - / - - / - - / - - / - - / - Installation Subtotal: Installation - / - - / - - / - - - - / - Total Total Cost (Procurement + Support + Installation) LI 846080 - DCGS-AF Air Force 288.333 34.840 38.312 41.731 0.000 UNCLASSIFIED Page 15 of 16 41.731 0.000 0.000 P-1 Line #64 0.000 0.000 - 403.216 Volume 1 - 771 === page 808 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 04 / 6 P-1 Line Item Number / Title: 846080 / DCGS-AF ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: 2 / ISR Transport and Processing MDAP/MAIS Code: Modification Item 1 of 1: ISR Transport and Processing Manufacturer Information Manufacturer Name: Various Manufacturer Location: Various Administrative Leadtime (in Months): 0 Dates FY 2025 Production Leadtime (in Months): 0 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Org/Intermediate LI 846080 - DCGS-AF Air Force Installation Quantity: 0 UNCLASSIFIED Page 16 of 16 P-1 Line #64 Volume 1 - 772 === page 809 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 846510 / Special Update Program Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 04: Other Base Maintenance and Support Equip / BSA 6: Special Support Projects ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) - Gross/Weapon System Cost ($ in Millions) - Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) - Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) - FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 1,518.290 1,518.290 1,518.290 1,282.297 1,282.297 1,282.297 5,099.420 5,099.420 5,099.420 - 5,099.420 - 5,099.420 - 5,099.420 1,599.429 1,300.844 1,599.429 1,300.844 1,599.429 1,300.844 1,036.782 1,036.782 1,036.782 To FY 2031 Complete 1,226.482 1,226.482 1,226.482 - Total 13,063.544 13,063.544 13,063.544 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Dollars) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Dollars) - - - - - - - - - - - - Description: This program is reported in accordance with Title 10, United States Code, Section 119(a)(1) in the Special Access Program Annual Report to Congress. Justification: This program is reported in accordance with Title 10, United States Code, Section 119(a)(1) in the Special Access Program Annual Report to Congress. LI 846510 - Special Update Program Air Force UNCLASSIFIED Page 1 of 1 P-1 Line #66 Volume 1 - 773 === page 810 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 774 === page 811 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 05: Spares and Repair Parts / BSA 1: Spares And Repair Parts P-1 Line Item Number / Title: 861350 / Spares and Repair Parts (Cyber) Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - - 0.000 1.056 1.075 8.657 - 8.657 9.163 9.985 1.189 1.212 0.000 32.337 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Total - - - - - - - - - - - - 0.000 1.056 1.075 8.657 - 8.657 9.163 9.985 1.189 1.212 0.000 32.337 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) To FY 2031 Complete - - - - - - - - - - - - 0.000 1.056 1.075 8.657 - 8.657 9.163 9.985 1.189 1.212 0.000 32.337 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: This program supports Cyberspace Activities. Initial Spares consist of reparable components, assemblies, subassemblies, and consumable items required as initial stock (including readiness spares package requirements) in support of newly fielded vehicles, communications electronics and telecommunications equipment, and other base maintenance and support equipment items. Requirements are determined by applying established factors against the acquisition cost of the end items. The factors are based on historical data of similar equipment, employment/deployment concepts, production schedules, and other related information. Funding for this exhibit contained in PE 0303140F. LI 861350 - Spares and Repair Parts (Cyber) Air Force UNCLASSIFIED Page 1 of 3 P-1 Line #67 Volume 1 - 775 === page 812 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 05: Spares and Repair Parts / BSA 1: Spares And Repair Parts ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 861350 / Spares and Repair Parts (Cyber) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-18 Spares and Repair Parts P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 1.056 - / 1.075 - / 8.657 / 0.000 - / 1.056 - / 1.075 - / 8.657 - / 0.000 - / 8.657 / - - / 8.657 Title represents the P-18 Title for Spares. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Information Systems Security Program (ISSP): FY 2027 funding is required to support Air and Ground (A&G) and Key Management Enterprise (KME) which supplies crypto devices to all Services/ Agencies to meet NSA cybersecurity mandates for warfighter air and ground networks. LI 861350 - Spares and Repair Parts (Cyber) Air Force UNCLASSIFIED Page 2 of 3 P-1 Line #67 Volume 1 - 776 === page 813 === UNCLASSIFIED Date: April 2026 Exhibit P-18, Initial and Replenishment Spare and Repair Parts Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 05 / 1 End Item Line Item Number / Name [MDAP/MAIS] P-1 Line Item Number / Title: 861350 / Spares and Repair Parts (Cyber) Prior Years FY 2025 ($ M) Title: Spares and Repair Parts FY 2026 ($ M) FY 2027 Base ($ M) ($ M) FY 2027 OOC ($ M) FY 2027 Total ($ M) Initial BA 05 - Spares and Repair Parts 861350 / Information Systems Security Programs - 1.056 1.075 8.657 0.000 8.657 Subtotal: Initial - 1.056 1.075 8.657 0.000 8.657 Total Cost (Initial + Replenishment) - 1.056 1.075 8.657 0.000 8.657 LI 861350 - Spares and Repair Parts (Cyber) Air Force UNCLASSIFIED Page 3 of 3 P-1 Line #67 Volume 1 - 777 === page 814 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 778 === page 815 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 05: Spares and Repair Parts / BSA 1: Spares And Repair Parts P-1 Line Item Number / Title: 861900 / Spares And Repair Parts Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 0.000 7.018 14.349 14.129 - 14.129 25.350 25.963 25.657 26.170 0.000 - - - - - - - - - - - 0.000 7.018 14.349 14.129 - 14.129 25.350 25.963 25.657 26.170 0.000 - - - - - - - - - - - 0.000 7.018 14.349 14.129 - 14.129 25.350 25.963 25.657 26.170 0.000 Total 138.636 138.636 138.636 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Initial Spares consist of reparable components, assemblies, subassemblies, and consumable items required as initial stock (including readiness spares package requirements) in support of newly fielded vehicles, communications electronics and telecommunications equipment, and other base maintenance and support equipment items. Requirements are determined by applying established factors against the acquisition cost of the end items. The factors are based on historical data of similar equipment, employment/deployment concepts, production schedules, and other related information. The following Programs have funding in this line: Air Traffic Control and Landing Systems (ATCALS) - PE 0305114F Combat Training Range Equipment Deployable C3 Expeditionary Airfield Basing Assets Information Systems Security Program (ISSP) National Airspace System (NAS) - PE 3050137F Wide Area Surveillance (WAS) LI 861900 - Spares And Repair Parts Air Force UNCLASSIFIED Page 1 of 3 P-1 Line #68 Volume 1 - 779 === page 816 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F: Other Procurement, Air Force / BA 05: Spares and Repair Parts / BSA 1: Spares And Repair Parts ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 861900 / Spares And Repair Parts Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-18 Spares and Repair Parts P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 7.018 - / 14.349 - / 14.129 / 0.000 - / 7.018 - / 14.349 - / 14.129 - / 0.000 - / 14.129 / - - / 14.129 Title represents the P-18 Title for Spares. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: ATCALS: FY 2027 funding (1.350 million) provides initial spares for the Man-Portable Tactical Air Navigation (TACAN) system (0.651 million), Fixed Base Navigational Aid Family of Systems (0.380 million), and FB-ILS (0.319 million). These systems replace legacy equipment that are beyond end of life and critical to aircraft safe aircraft landing during adverse weather conditions. Spares include but are not limited to single point failure components needed to insure sustained system operations in deployed environment. Combat Training Range Equipment: FY27 funds (6.935 million) funds will be used to purchase digital transmit and receive line replaceable units that will deliver just in time as initial spares for operational use of the ARTS V3 system. Spares include, but not limited to replacement components, equipment, and parts. NAS: FY 2027 funding (0.409 million) provides initial spares for replacement Air Traffic Control Voice Switch Recorders. The new recorders replace end of life units which are no longer being supported by the original equipment manufacturer. ATC Voice recorders are required to document pilot/controller communications in event of emergencies/accidents. Deployable C3: Deployable C3: FY27 funding (2.482 million) is required to support initial spares for the Agile Communications Package (ACP). These mission essential spare parts are unique and critical items required to be available for each individual fielding location and are procured utilizing this funding. Expeditionary Airfield Basing Assets: FY26 Baseline (2.525 million) funds mission readiness support kits for War Reserve Material (WRM) Unit Type Codes (UTC). These support kits include necessary components to ensure proper operation of equipment within UTC packages, which include but are not limited to, Power Production, Feeding, Water Production, Billeting, Maintenance Facilities, and HVAC. Also, mission essential spare parts are procured utilizing this funding. Expeditionary Airfield Basing Assets: - Fiscal Year (FY) 2025 European Deterrence Initiative (EDI) funding accounted for in the Base budget total 1,066 and supports Expeditionary Airfield Basing Assets. Zero OOC funds included in base FY26 budget. - FY24 European Defense Initiative (EDI) OCO funds (.994 million) mission readiness support kits for War Reserve Material (WRM) Unit Type Codes (UTC). These support kits include necessary components to ensure proper operation of equipment within UTC package. These UTC kits packages, but are not limited to, Power Production, Feeding, Water Production, Billeting, Maintenance Facilities, and HVAC. Also, mission essential spare parts are procured utilizing this funding. LI 861900 - Spares And Repair Parts Air Force UNCLASSIFIED Page 2 of 3 P-1 Line #68 Volume 1 - 780 === page 817 === UNCLASSIFIED Date: April 2026 Exhibit P-18, Initial and Replenishment Spare and Repair Parts Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3080F / 05 / 1 End Item Line Item Number / Name [MDAP/MAIS] P-1 Line Item Number / Title: 861900 / Spares And Repair Parts Prior Years FY 2025 ($ M) Title: Spares and Repair Parts FY 2026 ($ M) FY 2027 Base ($ M) ($ M) FY 2027 OOC ($ M) FY 2027 Total ($ M) Initial BA 05 - Spares and Repair Parts 861900 / Air Traffic Control, Approach, and Landing System (ATCALS) - - 1.758 1.350 0.000 1.350 861900 / Combat Training Range Equipment - 0.761 6.935 7.238 0.000 7.238 861900 / Deployable C3 Systems - 2.342 2.391 2.500 0.000 2.500 861900 / Expeditionary Airfield Basing Assets - 3.535 2.517 2.632 0.000 2.632 861900 / NATIONAL AIR SPACE SYSTEM (NAS) PLAN - 0.380 0.748 0.409 0.000 0.409 Subtotal: Initial - 7.018 14.349 14.129 0.000 14.129 Total Cost (Initial + Replenishment) - 7.018 14.349 14.129 0.000 14.129 LI 861900 - Spares And Repair Parts Air Force UNCLASSIFIED Page 3 of 3 P-1 Line #68 Volume 1 - 781 === page 818 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 782