=== page 1 === UNCLASSIFIED Department of War Fiscal Year (FY) 2027 Budget Estimates April 2026 Air Force Justification Book Volume 1 of 1 Missile Procurement, Air Force UNCLASSIFIED === page 2 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED === page 3 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Table of Volumes Air Force - 3020................................................................................................................................................................. Volume 1 UNCLASSIFIED Volume 1 - i === page 4 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - ii === page 5 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Volume 1 Table of Contents Introduction and Explanation of Contents................................................................................................................Volume 1 - v Comptroller Exhibit P-1.............................................................................................................................................Volume 1 - vii Master Line Item Table of Contents (by Appropriation then Line Number)........................................................Volume 1 - xiii Master Line Item Table of Contents (Alphabetically by Line Item Title).............................................................Volume 1 - xvii Executive Summary..................................................................................................................................................Volume 1 - xix Acronyms................................................................................................................................................................ Volume 1 - xxiii Exhibit P-40s................................................................................................................................................................ Volume 1 - 1 UNCLASSIFIED Volume 1 - iii === page 6 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - iv === page 7 === UNCLASSIFIED Appropriation Language Fiscal Year (FY) 2027 President’s Budget Missile Procurement, Air Force For construction, procurement, and modification of missiles, rockets, and related equipment, including spare parts and accessories therefor; ground handling equipment, and training devices; expansion of public and private plants, Government owned equipment and installation thereof in such plants, erection of structures, and acquisition of land, for the foregoing purposes, and such lands and interests therein, may be acquired, and construction prosecuted thereon prior to approval of title; reserve plant and Government and contractor-owned equipment layaway; and other expenses necessary for the foregoing purposes including rents and transportation of things, $6,811,174,000, to remain available for obligation until September 30, 2029. UNCLASSIFIED Volume 1 - v === page 8 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - vi === page 9 === UNCLASSIFIED Department Of War FY 2027 President's Budget Exhibit P-1 Total Obligation Authority DoW Component Summary (Dollars in Thousands) Appropriation Summary Missile Procurement, Air Force FY 2025 Actuals FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total 5,313,624 3,963,961 2,340,000 6,303,961 6,811,174 4,566,669 11,377,843 Total Department of the Air Force 5,313,624 3,963,961 2,340,000 6,303,961 6,811,174 4,566,669 11,377,843 Grand Total Department Of War 5,313,624 3,963,961 2,340,000 6,303,961 6,811,174 4,566,669 11,377,843 UNCLASSIFIED Volume 1 - vii === page 10 === UNCLASSIFIED Department Of the Air Force FY 2027 President's Budget Exhibit P-1 Total Obligation Authority Air Force Summary (Dollars in Thousands) FY 2026 PL 119-21 Spend Plan FY 2026 Discretionary Enacted FY 2026 Total FY 2027 Discretionary Request FY 2027 Mandatory Request Appropriation Summary FY 2025 Actuals Missile Procurement, Air Force 5,313,624 3,963,961 2,340,000 6,303,961 6,811,174 4,566,669 11,377,843 5,313,624 3,963,961 2,340,000 6,303,961 6,811,174 4,566,669 11,377,843 Total Department of the Air Force UNCLASSIFIED FY 2027 Total Volume 1 - viii === page 11 === UNCLASSIFIED Department Of the Air Force FY 2027 President's Budget Exhibit P-1 Total Obligation Authority 3020F Budget Activity Summary (Dollars in Thousands) Appropriation: Missile Procurement, Air Force FY 2025 Actuals FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total Budget Activity 01. Ballistic missiles 02. Other missiles 63,489 37,282 176,000 213,282 134,608 1,837,600 4,615,359 5,536,310 175,373 210,019 210,019 115,473 138,845 138,845 3,620,739 2,777,759 03. Modification of inservice missiles 202,606 175,373 04. Spares and repair parts 111,150 114,073 05. Other support Total Missile Procurement, Air Force 1,400 1,315,640 859,474 325,000 1,184,474 791,392 5,313,624 3,963,961 2,340,000 6,303,961 6,811,174 UNCLASSIFIED 134,608 4,566,669 10,102,979 791,392 4,566,669 11,377,843 Volume 1 - ix === page 12 === UNCLASSIFIED Department Of the Air Force FY 2027 President's Budget Exhibit P-1 Total Obligation Authority 3020F Detail (Dollars in Thousands) Appropriation: 3020 Missile Procurement, Air Force Line No Item Nomenclature FY 2025 Actuals Ident Code Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost FY 2027 Discretionary Request Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Budget Activity 01: Ballistic missiles Missile Replacement Equipment - Ballistic 1 2 Missile Replacement Eq-Ballistic A 37,333 35,116 35,116 27,006 27,006 (176,742) (110,822) (110,822) (-742) (-3,220) (-3,220) 176,000 176,000 107,602 107,602 176,000 213,282 134,608 134,608 Missile Replacement Eq-Ballistic Advance Procurement (CY) C (FY 2026 for FY 2028) (M) 2,166 2,166 (2,166) (2,166) Ballistic Missiles 3 Ground Based Strategic Deterrent A (742) Less: Advance Procurement (PY) 4 Mk21A Reentry Vehicle (176,000) (-742) A Total Ballistic missiles 26,156 63,489 37,282 (70,335) (131,372) Budget Activity 02: Other missiles Strategic 5 Long Range Stand-Off Weapon A (131,372) Less: Advance Procurement (PY) 6 (646,047) (646,047) (-140,000) (-140,000) 70,335 131,372 131,372 506,047 506,047 140,000 210,000 210,000 456,810 456,810 (210,000) (210,000) (456,810) (456,810) 23,575 23,575 Long Range Stand-Off Weapon Advance Procurement (CY) C (FY 2025 for FY 2027) (M) (140,000) C (FY 2026 for FY 2028) (M) C (FY 2027 for FY 2029) (M) Tactical 7 Replac Equip & War Consumables 8 Advanced Precision Kill Weapon System (APKWS) Missile A 6,533 12,436 1,000 12,436 85,428 1,000 UNCLASSIFIED 85,428 Volume 1 - x === page 13 === UNCLASSIFIED Department Of the Air Force FY 2027 President's Budget Exhibit P-1 Total Obligation Authority 3020F Detail (Dollars in Thousands) Appropriation: 3020 Missile Procurement, Air Force Line No Item Nomenclature Ident Code 9 AGM-183A Air-Launched Rapid Response Weapon 10 Family of Affordable Mass Missile (FAMM) 11 Hypersonic Attack Cruise Missile A 12 Joint Air-Surface Standoff Missile A Qty Joint Advanced Tactical Missile 14 Joint Strike Missile 15 LRASM0 Cost Qty A Cost Qty Cost 1,000 A FY 2027 Discretionary Request FY 2026 Total Qty 362,155 335,000 1,000 Cost Qty Cost FY 2027 Mandatory Request Qty 362,155 452,035 335,000 55,000 1,000 Cost FY 2027 Total Qty 577 40 172 Less: Advance Procurement (PY) 16 Sidewinder (AIM-9X) A 579 17 AMRAAM A 411 Less: Advance Procurement (PY) (1,192,469) 144 (510,499) (-222,418) (-182,418) 970,051 328,081 368,593 150,909 (589,076) 93 (319,369) (-24,967) (-24,968) 564,109 294,401 306,159 173 100,352 (637,494) 237 (382,125) 237 (490,000) 381 300,000 1,000 491 (1,150,284) 355,000 403,974 330 (1,029,448) 821 (2,179,732) (-182,418) (-182,418) 490,000 818,081 967,866 1,029,448 1,997,314 225,000 593,593 608,743 1,055,876 1,664,619 100 377,000 100 21 (112,000) 114 112,000 186 (1,000,499) Cost 452,035 403,974 Less: Advance Procurement (PY) 13 FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan FY 2025 Actuals (298,600) 377,000 100 384,607 (431,369) 111 (525,884) (-24,968) (-24,968) 406,401 500,916 173 100,352 648 423 (680,725) 38 (-182,418) 45 (236,389) 384,607 156 (762,273) (-24,968) 236,389 419,238 (115,856) 1,279 100 737,305 648 419,238 (1,944,956) 1,317 (2,060,812) (-53,103) 584,391 382,125 298,600 680,725 115,856 1,944,956 2,060,812 18 Predator Hellfire Missile A 19 Small Diameter Bomb A 1,237 261,681 511 41,510 511 41,510 220 44,596 220 44,596 20 SMALL DIAMETER BOMB II A 1,228 407,222 806 307,743 806 307,743 373 194,509 373 194,509 21 Stand-In Attack Weapon (SIAW) A 152,646 75 152,646 75 152,646 155 401,607 155 401,607 5,790 Industrial Facilities 22 Industrial Preparedness/Pol Prevention A Total Other missiles 913 917 3,620,739 2,777,759 1,837,600 917 931 4,615,359 5,536,310 931 4,566,669 10,102,979 Budget Activity 03: Modification of inservice missiles UNCLASSIFIED Volume 1 - xi === page 14 === UNCLASSIFIED Department Of the Air Force FY 2027 President's Budget Exhibit P-1 Total Obligation Authority 3020F Detail (Dollars in Thousands) Appropriation: 3020 Missile Procurement, Air Force Line No Item Nomenclature FY 2025 Actuals Ident Code Qty Cost FY 2026 Discretionary FY 2026 PL 119-21 Spend Enacted Plan Qty Cost Qty Cost FY 2026 Total Qty Cost FY 2027 Discretionary Request Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Class IV 23 ICBM FUZE MOD A Less: Advance Procurement (PY) 24 (153,569) (157,049) (157,049) (197,847) (197,847) (-35,507) (-37,673) (-37,673) (-28,100) (-28,100) 118,062 119,376 119,376 169,747 169,747 14,604 14,604 9,865 9,865 ICBM FUZE MOD Advance Procurement (CY) 26,313 C (FY 2025 for FY 2028) (M) (26,313) 25 MM III Modifications A 26 Air Launch Cruise Missile (ALCM) A Total Modification of inservice missiles 24,212 34,019 41,393 41,393 30,407 30,407 202,606 175,373 175,373 210,019 210,019 6,956 5,824 1,400 7,224 15,621 15,621 Budget Activity 04: Spares and repair parts Missile Spares and Repair Parts 27 Msl Sprs/Repair Parts (Initial) A 28 Msl Sprs/Repair Parts (Replen) A Total Spares and repair parts 104,194 108,249 108,249 123,224 123,224 111,150 114,073 1,400 115,473 138,845 138,845 628,436 221,199 325,000 546,199 168,578 168,578 Budget Activity 05: Other support Special Programs 30 Special Update Programs A Classified Programs 999 Classified Programs 687,204 638,275 638,275 622,814 622,814 Total Other support 1,315,640 859,474 325,000 1,184,474 791,392 791,392 Total Missile Procurement, Air Force 5,313,624 3,963,961 2,340,000 6,303,961 6,811,174 UNCLASSIFIED 4,566,669 11,377,843 Volume 1 - xii === page 15 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Master Line Item Table of Contents (by Appropriation then Line Number) Appropriation 3020F: Missile Procurement, Air Force Line # BA BSA Line Item Number Line Item Title Page 1 01 03 00099L Missile Replacement Eq-Ballistic........................................................................................................... Volume 1 - 1 2 01 03 00099L Missile Replacement Eq-Ballistic, Advance Procurement......................................................................Volume 1 - 9 3 01 04 MGBSD0 Ground Based Strategic Deterrent...................................................................................................... Volume 1 - 13 4 01 04 MK21A0 Mk21A Reentry Vehicle....................................................................................................................... Volume 1 - 17 Appropriation 3020F: Missile Procurement, Air Force Line # BA BSA Line Item Number Line Item Title Page 5 02 01 MLRSO1 Long Range Stand-Off Weapon.......................................................................................................... Volume 1 - 21 6 02 01 MLRSO1 Long Range Stand-Off Weapon, Advance Procurement..................................................................... Volume 1 - 27 7 02 02 222000 Replac Equip & War Consumables..................................................................................................... Volume 1 - 31 8 02 02 APKWS0 Advanced Precision Kill Weapon System (APKWS) Missile............................................................... Volume 1 - 35 9 02 02 ARRW00 AGM-183A Air-Launched Rapid Response Weapon...........................................................................Volume 1 - 37 10 02 02 FAMM00 Family of Affordable Mass Missile (FAMM)......................................................................................... Volume 1 - 41 UNCLASSIFIED Volume 1 - xiii === page 16 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Appropriation 3020F: Missile Procurement, Air Force Line # BA BSA Line Item Number Line Item Title Page 11 02 02 HACM00 Hypersonic Attack Cruise Missile........................................................................................................ Volume 1 - 45 12 02 02 JASSM0 Joint Air-Surface Standoff Missile........................................................................................................Volume 1 - 49 13 02 02 JATM00 Joint Advanced Tactical Missile...........................................................................................................Volume 1 - 61 14 02 02 JSM000 Joint Strike Missile............................................................................................................................... Volume 1 - 63 15 02 02 LRASM0 LRASM0............................................................................................................................................... Volume 1 - 73 16 02 02 M09HAI Sidewinder (AIM-9X)............................................................................................................................ Volume 1 - 85 17 02 02 MAMRA0 AMRAAM............................................................................................................................................Volume 1 - 101 18 02 02 PRDTA2 Predator Hellfire Missile..................................................................................................................... Volume 1 - 113 19 02 02 SDB000 Small Diameter Bomb........................................................................................................................ Volume 1 - 115 20 02 02 SDB002 Small Diameter Bomb II.....................................................................................................................Volume 1 - 127 21 02 02 SIAW24 Stand-In Attack Weapon (SIAW)....................................................................................................... Volume 1 - 149 22 02 05 000042 Industrial Preparedness/Pol Prevention.............................................................................................Volume 1 - 161 Appropriation 3020F: Missile Procurement, Air Force Line # BA BSA Line Item Number Line Item Title 23 03 01 ICBM FUZE MOD.............................................................................................................................. Volume 1 - 163 M30FLH Page UNCLASSIFIED Volume 1 - xiv === page 17 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Appropriation 3020F: Missile Procurement, Air Force Line # BA BSA Line Item Number Line Item Title Page 24 03 01 M30FLH ICBM FUZE MOD, Advance Procurement........................................................................................ Volume 1 - 171 25 03 01 M30MLG MM III Modifications........................................................................................................................... Volume 1 - 175 26 03 01 MALCBG Air Launch Cruise Missile (ALCM).....................................................................................................Volume 1 - 181 Appropriation 3020F: Missile Procurement, Air Force Line # BA BSA Line Item Number Line Item Title Page 27 04 10 00098A Msl Sprs/Repair Parts (Initial)............................................................................................................ Volume 1 - 193 28 04 10 00098K Msl Sprs/Repair Parts (Replen)......................................................................................................... Volume 1 - 197 Appropriation 3020F: Missile Procurement, Air Force Line # BA BSA Line Item Number Line Item Title 30 05 04 Special Update Programs.................................................................................................................. Volume 1 - 201 MSPPRG Page UNCLASSIFIED Volume 1 - xv === page 18 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - xvi === page 19 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Master Line Item Table of Contents (Alphabetically by Line Item Title) Line Item Title Line Item Number Line # BA BSA Page AGM-183A Air-Launched Rapid Response Weapon ARRW00 9 02 02..................... Volume 1 - 37 AMRAAM MAMRA0 17 02 02................... Volume 1 - 101 Advanced Precision Kill Weapon System (APKWS) Missile APKWS0 8 02 02..................... Volume 1 - 35 Air Launch Cruise Missile (ALCM) MALCBG 26 03 01................... Volume 1 - 181 Family of Affordable Mass Missile (FAMM) FAMM00 10 02 02..................... Volume 1 - 41 Ground Based Strategic Deterrent MGBSD0 3 01 04..................... Volume 1 - 13 Hypersonic Attack Cruise Missile HACM00 11 02 02..................... Volume 1 - 45 ICBM FUZE MOD M30FLH 23 03 01................... Volume 1 - 163 ICBM FUZE MOD, Advance Procurement M30FLH 24 03 01................... Volume 1 - 171 Industrial Preparedness/Pol Prevention 000042 22 02 05................... Volume 1 - 161 Joint Advanced Tactical Missile JATM00 13 02 02..................... Volume 1 - 61 Joint Air-Surface Standoff Missile JASSM0 12 02 02..................... Volume 1 - 49 Joint Strike Missile JSM000 14 02 02..................... Volume 1 - 63 LRASM0 LRASM0 15 02 02..................... Volume 1 - 73 Long Range Stand-Off Weapon MLRSO1 5 02 01..................... Volume 1 - 21 Long Range Stand-Off Weapon, Advance Procurement MLRSO1 6 02 01..................... Volume 1 - 27 MM III Modifications M30MLG 25 03 01................... Volume 1 - 175 UNCLASSIFIED Volume 1 - xvii === page 20 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Missile Replacement Eq-Ballistic 00099L 1 01 03....................... Volume 1 - 1 Missile Replacement Eq-Ballistic, Advance Procurement 00099L 2 01 03....................... Volume 1 - 9 Mk21A Reentry Vehicle MK21A0 4 01 04..................... Volume 1 - 17 Msl Sprs/Repair Parts (Initial) 00098A 27 04 10................... Volume 1 - 193 Msl Sprs/Repair Parts (Replen) 00098K 28 04 10................... Volume 1 - 197 Predator Hellfire Missile PRDTA2 18 02 02................... Volume 1 - 113 Replac Equip & War Consumables 222000 7 02 02..................... Volume 1 - 31 Sidewinder (AIM-9X) M09HAI 16 02 02..................... Volume 1 - 85 Small Diameter Bomb SDB000 19 02 02................... Volume 1 - 115 Small Diameter Bomb II SDB002 20 02 02................... Volume 1 - 127 Special Update Programs MSPPRG 30 05 04................... Volume 1 - 201 Stand-In Attack Weapon (SIAW) SIAW24 21 02 02................... Volume 1 - 149 UNCLASSIFIED Volume 1 - xviii === page 21 === Executive Summary for Missile Procurement, Air Force Table 1: Funding Overview Discretionary FY 2025 ($K) FY 2026 ($K) FY 2027 ($K) $5,313,624 $3,963,961 $6,811,174 $2,340,000 $4,566,669 $6,303,961 $11,377,843 Mandatory Total $5,313,624 Table 2: Detailed Mandatory Breakout BLI Reconciliation Bin Title FY 2025 ($K) FY 2026 ($K) 00098A Munitions & Supply Chain $1,400 FAMM00 Low-Cost Weapons $335,000 FAMM00 Munitions JASSM0 Munitions & Supply Chain JASSM0 Munitions JATM00 Munitions & Supply Chain JATM00 Munitions JSM000 Low-Cost Weapons FY 2027 ($K) $300,000 $490,000 $1,029,448 $225,000 $1,055,876 $283,000 JSM000 Munitions & Supply Chain $94,000 LRASM0 Munitions & Supply Chain $112,000 LRASM0 Munitions MAMRA0 Munitions & Supply Chain MAMRA0 Munitions MGBSD0 Nuclear $236,389 $298,600 $1,944,956 $176,000 Volume 1 - xix === page 22 === MSPPRG Munitions & Supply Chain Mandatory Total $325,000 0 2,340,000 4,566,669 MANDATORY FUNDING JUSTIFICATION: The FY 2027 request for Air Force Missile Procurement includes $6,811,174 thousand of discretionary and $4,566,669 thousand of mandatory for a total of $11,377,843. Munitions Acceleration Council (MAC) Long Range Anti-Ship Missile (LRASM) Procurement: The $236.4 million procures 45 missiles to complete the Long-Range Anti-Ship Missile (LRASM) annual maximum lot buy quantity of 318 all up rounds. Munitions Acceleration Council (MAC) Maximized JASSM-ER Procurement: The $1,029 million for the Air Force procures 330 missiles to complete Joint Air-to-Surface Standoff Missile (JASSM) annual maximum lot buy quantity total of 860 all up rounds. Munitions Acceleration Council (MAC) Low Cost Cruise Missile Development & Procurement: Provides $300 million for the Air Force to procure up to 1,000 units and expand the Family of Affordable Mass Missiles (FAMM) production rates. Munitions Acceleration Council (MAC) Joint Advanced Tactical Missile (JATM) Procurement: The $900 million supports the procurement of JATM. Details are available at a higher level. Munitions Acceleration Council (MAC) Advanced Medium-Range Air-to-Air Missile (AMRAAM) Procurement: The FY27 mandatory request of $953 million procures 618 Advanced Medium-Range Air-to-Air Missiles. Munitions Acceleration Council (MAC) FY 2026 Procurement: The $1,058 million provides funds ($992M AMRAAM and $66M JATM) to address the current incremental costs to initiate the Department’s efforts to accelerate the delivery and drive munitions industrial base investments of critical munitions. Volume 1 - xx === page 23 === The FY 2025 spend plan amount for Air Force Missile Procurement includes $5,479,937 thousand of discretionary and no mandatory (reconciliation) for a total of $5,479,937. Volume 1 - xxi === page 24 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - xxii === page 25 === UNCLASSIFIED ACRONYMS GENERAL ACRONYMS A&AS ABIDES ACAT ACTD AGM AIM AIS ACMI AMRAAM APPN ATD BA BES BY C3 CFE CONOPS CONUS CPMS CPT CRA CTS CY ECCM ECM ECO EOQ ECP EPA EW EWAISP FLIR - Advisory & Assistance Services - Automated Budget Interactive Data Environment System - Acquisition Category - Advanced Concept Technology Demonstration - Air-to-Ground Missile - Air Intercept Missile - Avionics Intermediate Shop - Aircraft Combat Maneuvering Instrumentation - Advanced Medium-Range Air-to-Air Missile - Appropriation - Advanced Technology Development - Budget Activity - Budget Estimate Submission - Budget Year - Command, Control, and Communication System - Contractor Furnished Equipment - Concept of Operation - Continental United States - Comprehensive Power Management System - Cockpit Procedures Trainer - Continuing Resolution Authority - Countermeasures Test Set - Current Year - Electronic Counter Counter-Measures - Electronic Counter Measures - Engineering Change Orders - Economic Order Quantity - Engineering Change Proposal - Economic Price Adjustment - Electronic Warfare - Electronic Warfare Avionics Integration Support Facility - Forward Looking Infra Red UNCLASSIFIED Volume 1 - xxiii === page 26 === UNCLASSIFIED FOT&E FOC FLTS FPIF FPIS FY GANS GATM GFE GFP GPS GSE ICS IOC IT JUON MAIS MDAP METS MYP NAVWAR NMC Rate OCO OOC OT&E OWRM PAGEL PB PBR PMA PMC PNO PR PRCP PTT PY - Follow-on Test and Evaluation - Fully Operational Capability - Flight Line Test Set - Fixed Price Incentive Firm - Fixed Price Incentive Fee, Successive Targets - Fiscal Year - Global Access Navigation & Safety - Global Air Traffic Management - Government Furnished Equipment - Government Furnished Property - Global Positioning System - Ground Support Equipment - Interim Contractor Support - Initial Operating Capability - Information Technology - Joint Urgent Operational Need - Major Automated Information System Program - Major Defense Acquisition Program - Mobile Electronic Test Stations - Multiyear Procurement - Navigation Warfare - Not Mission Capable Rate - Overseas Contingency Operations - Overseas Operations Costs - Operational Test and Evaluation - Other War Reserve Material - Priced Aerospace Ground Equipment List - President's Budget - Program Budget Review - Program Management Administration - Procurement Method Code - Acquisition Program Number (MDAP Codes) - Purchase Request - Program Resource Collection Process - Part Task Trainer - Prior Year UNCLASSIFIED Volume 1 - xxiv === page 27 === UNCLASSIFIED R&M RAA RDT&E RWR ROM SS SOF TAF TCAS TEWS TISS TOA WCF WRM WST UAV XML - Reliability and Maintainability - Rapid Acquisition Authority - Research, Development, Test and Evaluation - Radar Warning Receiver - Rough Order of Magnitude - Sole Source - Special Operation Force - Tactical Air Force - Traffic Collision Alert and Avoidance System - Tactical Electronic Warfare System - TEWS Intermediate Support System - Total Obligation Authority - Working Capital Fund - War Reserve Material - Weapon System Trainer - Unmanned Aerial Vehicle - Extensible Markup Language BASE / ORGANIZATIONAL ACRONYMS ACC - Air Combat Command AETC - Air Education & Training Command AFCAO - Air Force Computer Acquisition Office AFCESA - Air Force Civil Engineering Support Agency AFCIC - AF Communications & Information Center AFCSC - Air Force Cryptologic Service Center AFESC - Air Force Engineering Services Center AFGWC - Air Force Global Weather Central AFIT - Air Force Institute of Technology AFLCMC - Air Force Life Cycle Management Center AFMC - Air Force Materiel Command AFMETCAL - Air Force Metrology and Calibration Office AFMLO - Air Force Medical Logistics Office AFOSI - Air Force Office of Special Investigation AFOTEC - Air Force Operational Test & Evaluation Center AFPC - Air Force Personnel Center UNCLASSIFIED Volume 1 - xxv === page 28 === UNCLASSIFIED AFPSL AFR AFSOC AFSPC AIA ALC AMC ANG ASC AETC AU AWS CIA DGSC DLA DOE DPSC DSCC DTIC ER ESC FAA FBI GSA JCS NATO OSW PACAF USAF USAFA USAFE USCENTCOM USEUCOM USMC USSTRATCOM WP AFB - AF Primary Standards Lab - Air Force Reserve - AF Special Operations Command - Air Force Space Command - Air Intelligence Agency - Air Logistics Center - Air Mobility Command - Air National Guard - Aeronautical Systems Center - Air Education Training Command - Air University - Air Weather Service - Central Intelligence Agency - Defense General Support Center - Defense Logistics Center - Department of Energy - Defense Personnel Support Center - Defense Supply Center, Columbus - Defense Technical Information Center - Eastern Range - Electronic Systems Center - Federal Aviation Agency - Federal Bureau of Investigation - General Services Administration - Joint Chiefs of Staff - North Atlantic Treaty Organization - Office of the Secretary of War - Pacific Air Forces - United States Air Force - United States Air Force Academy - United States Air Force Europe - United States Central Command - United States European Command - United States Marine Corps - United States Strategic Command - Wright-Patterson AFB, OH UNCLASSIFIED Volume 1 - xxvi === page 29 === UNCLASSIFIED CONTRACT METHOD / TYPE ACRONYMS C - Competitive BA - Basic Agreement BOA - Basic Ordering Agreement BPA - Blanket Purchasing Agreement CS - Cost Sharing IDDQ - Indefinite Delivery, Definite Quantity IDIQ - Indefinite Delivery, Indefinite Quantity IDRT - Indefinite Delivery, Requirements Letter - Letter LH - Labor-hour MIPR - Military Interdepartmental Purchase Request MIPR-C - Military Interdepartmental Purchase Request - Competitive MIPR-OPT - Military Interdepartmental Purchase Request - Option MIPR-OTH - Military Interdepartmental Purchase Request – Other MIPR-SS - Military Interdepartmental Purchase Request - Sole Source OPT - Option OTH - Other PO - Project Order REQN - Requisition SS - Sole Source T&M - Time and Materials UCA - Undefinitized Contract Action WP - Work Project CONTRACTED BY ACRONYMS 11 WING - 11th Support Wing, Washington, DC ACC - Air Combat Command, Langley AFB, VA AEDC - Arnold Engineering Development Center, Arnold AFB, TN AAC - Air Armament Center, Eglin AFB, FL AEDC - Arnold Engineering Development Center, Arnold AFB, TN AETC - Air Education and Training Command, Randolph AFB, TX AFCIC - Air Force Communications and Information Center, Washington, DC AFCESA - Air Force Civil Engineering Support Agency, Tyndall AFB, FL UNCLASSIFIED Volume 1 - xxvii === page 30 === UNCLASSIFIED AFFTC AFLCMC AFMC AFMETCAL AFMLO AIA AMC ASC AFWA DGSC DPSC ER ESC HSC OC-ALC OO-ALC SMC US STRATCOM WACC WR WR-ALC AFSPC HQ ANG USAFE USAFA - Air Force Flight Test Center, Edwards AFB, CA - Air Force Life Cycle Management Center, Wright-Patterson AFB, OH - Air Force Materiel Command, Wright-Patterson AFB, OH - Air Force Metrology and Calibration Office, Heath, Ohio - Air Force Medical Logistics Office, Ft Detrick, MD - Air Intelligence Agency, Kelly AFB, TX - Air Mobility Command, Scott AFB, IL - Aeronautical Systems Center, Wright-Patterson AFB, OH & Eglin AFB, FL - Air Force Weather Agency, Offutt AFB, NE - Defense General Support Center, Richmond, VA - Defense Personnel Support Center, Philadelphia, PA - Eastern Range, Patrick SFB, FL - Electronic Systems Center, Hanscom AFB, MA - Human Services Center, Brook AFB, TX - Oklahoma City Air Logistics Center, Tinker AFB, OK - Ogden Air Logistics Center, Hill AFB, UT - Space & Missile Systems Center, Los Angeles AFB, CA - US Strategic Command, Offutt AFB, NE - Washington Area Contracting Center, Washington DC - Western Range, Vandenberg SFB, CA - Warner-Robins Air Logistics Center, Robins AFB, GA - Air Force Space Command, Peterson AFB, CO - Headquarters, Air National Guard, Washington, DC - United States Air Force Europe, Ramstein AB, GE - United States Air Force Academy, Colorado Springs, CO IDENTIFICATION CODES Code “A” - Line items of material which have been approved for Air Force service use. Code “B” - Line items of material that have not been approved for Service use OBAN - Operating Budget Account Number, 2-digit code for unit allocated funds UNCLASSIFIED Volume 1 - xxviii === page 31 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 00099L / Missile Replacement Eq-Ballistic Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 01: Ballistic Missiles / BSA 3: Missile Replacement Equipment - Ballistic ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0101213F Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 37.333 35.116 27.006 - 27.006 50.469 58.337 4.631 4.721 - - Less PY Advance Procurement ($ in Millions) - 0.000 0.000 0.000 - 0.000 2.166 0.000 0.000 0.000 - 2.166 Net Procurement (P-1) ($ in Millions) - 37.333 35.116 27.006 - 27.006 48.303 58.337 4.631 4.721 - 215.447 Plus CY Advance Procurement ($ in Millions) - 0.000 2.166 0.000 - 0.000 0.000 0.000 0.000 0.000 - 2.166 Total Obligation Authority ($ in Millions) - 37.333 37.282 27.006 - 27.006 48.303 58.337 4.631 4.721 - 217.613 217.613 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The Minuteman III (MMIII) Missile Replacement Equipment effort consists of multiple projects required to sustain the weapon systems capabilities that support equipment for all out-of-production ballistic missile systems. Equipment procured is used for missile weapon systems maintenance and testing at organizational/intermediate (base/field) launch control facilities, as well as, missile testing facilities, equipment, and qualified minor construction costs related to depot activation. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. Related Research, Development, Test & Evaluation, Air Force funding is contained in PE 0101213F. • Ballistic Missile Items Less Than 5 million: This procures low-cost new, modified, or replacement support equipment, to include facilities and other equipment to support programmed depot maintenance capability activation. Support equipment procurement activities replace and modernize unavailable or unsupportable aged and obsolete equipment which cannot be procured using operations and maintenance funding. These costs also fall below the threshold of $5 million for a stand-alone MMIII program. The list of activities includes but is not limited to critical BGRC support equipment buys, inline circuit tester for infrastructure efforts, GPC purchases, shipping MORDs, motor generator test stands, Little Mountain Test Facility (LMTF) buys under 5M, dozens of initiatives which are accomplished in priority order given available funds. • Payload Transporter Replacement (PTR): Procures 48 nuclear certified tractor (24) and trailer (24) to emplace, extract, and transport the reentry system, the Propulsion System Rocket Engine, and the guidance system. Replaces current payload transporter to meet USSTRATCOM security requirements and addresses supportability issues required to sustain MM III operations through fielding of LGM-35A Sentinel Weapon System. This requirement (or modification) supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. • Higher Authority Command Test System (HACTS) 2.0 Program replaces obsolete/unsupportable communication system test equipment. This effort adds the Weapon System Control Element (WSCE) simulator, moves to DoW mandated OS standard, and pushes through an Authority to Operate (ATO) with cybersecurity. • Little Mountain Test Facility (LMTF) Support Equipment funding ensures the testing site can support MMIII and Sentinel radiation test activities. Support equipment investments will increase as aging and obsolescent equipment is identified that cannot last until LGM-35A Sentinel's later than expected deployment date. The integrity of LMTF's operational testing is jeopardized by critical radiation testing equipment that has aged beyond its expected lifespan, creating significant vulnerabilities. Funding to replace this aging equipment is essential to avoid schedule slippage and ensure LMTF's continued ability to perform its mission, safeguarding long-term program viability. LI 00099L - Missile Replacement Eq-Ballistic Air Force UNCLASSIFIED Page 1 of 8 P-1 Line #1 Volume 1 - 1 === page 32 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 01: Ballistic Missiles / BSA 3: Missile Replacement Equipment - Ballistic ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 00099L / Missile Replacement Eq-Ballistic Program Elements for Code B Items: N/A Other Related Program Elements: 0101213F Line Item MDAP/MAIS Code: N/A FY25 rescission of $4.338 million is not reflected in this budget documentation. Funding for this exhibit contained in PE 0101213F. LI 00099L - Missile Replacement Eq-Ballistic Air Force UNCLASSIFIED Page 2 of 8 P-1 Line #1 Volume 1 - 2 === page 33 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 01: Ballistic Missiles / BSA 3: Missile Replacement Equipment - Ballistic ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 00099L / Missile Replacement Eq-Ballistic Program Elements for Code B Items: N/A Other Related Program Elements: 0101213F Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Ballistic Missile Items Less Than $5 Million P-5 Higher Authority Communications Test System (HACTS 2.0) P-40a Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - / 15.912 - / 26.732 - / - - / - - / 0.000 Higher Authority Communications Test System (HACTS 2.0) - / - - / - P-40a Little Mountain Test Facility (LMTF) Supt/Eqp - / - - / 6.700 P-40a Payload Transporter Replacement (PTR) - / - - / 14.721 P-40 Total Gross/Weapon System Cost - / - - / 37.333 A - - - / 16.206 - / - / - - / - - / 16.206 - / - / - - / 0.500 - / - - / 0.500 - / 7.000 - / 10.000 - / - - / 10.000 - / 1.384 - / 0.300 - / - - / 0.300 - / 35.116 - / 27.006 - / - - / 27.006 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding provides replacement support equipment items for an aging inventory of equipment which has become increasingly costly to maintain. These items will increase ballistic missile system reliability and maintainability by providing state-of-the-art maintenance repair and testing capability. The items are required to bridge the gap to the National Defense Strategy and National Military Strategy directed nuclear force modernization activities. Requirements are jointly determined by Headquarters United States Air Force (HQ USAF), Air Force Materiel Command (AFMC) and Air Force Global Strike Command (AFGSC) and are based on established allowance standards. Items requested in FY 2027 are displayed on the attached P-40A. Items procured during execution may change based on critical equipment needed to support current and emerging Air Force mission requirements. • Ballistic Missile Items Less Than 5 million: FY2027 will procure low-cost support equipment required to sustain MMIII operations through fielding of the LGM-35A Sentinel Weapons System. This effort provides support equipment to enable refurbishment efforts for component and system life extensions to maintain the MMIII weapon system effectiveness and reliability until Sentinel fields. Support equipment investments will increase as aging and obsolescent equipment is identified that cannot last until Sentinel's later than expected deployment date. • Higher Authority Communications Test System (HACTS 2.0): FY2027 funds production activities such as labor, fees and production/installation costs for 13 test systems. Production will also include refurbishment of 2 EMD units to configuration. FY2027 request is for $.500 million and does not print due to line being under $5 million. • PTR: FY 2027 funds fielding and training requirements (labor, material, fees), Field Service Representative (FSR) support, materials, inflation, and margin for uncertainty. • Little Mountain Test Facility (LMTF) Support Equipment FY 2027 funding ensures the testing site can support LGM-30G MMIII and LGM-35A Sentinel radiation, electromagnetic effects, shock and vibration, and other test activities required at the facility, to include lab equipment and associated materials to keep equipment functioning, supportable, and on schedule for customers such as the Large Flash X-Ray (LFXR), oscilloscopes, data acquisition systems, temperature regulation, power supplies, acoustic chambers, test controllers, vibrometers, and other critical test equipment. Support equipment investments will increase as aging and obsolescent equipment is identified which must be replaced before Sentinel's deployment date. LI 00099L - Missile Replacement Eq-Ballistic Air Force UNCLASSIFIED Page 3 of 8 P-1 Line #1 Volume 1 - 3 === page 34 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 00099L / Missile Replacement Eq-Ballistic Appropriation / Budget Activity / Budget Sub Activity: 3020F / 01 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2026 Total Cost ($ M) Unit Cost ($ M) Qty (Each) Aggregated Items Title: Ballistic Missile Items Less Than $5 Million FY 2027 Base Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) Various HACTS 2.0 (non-AP) A - - - - - 4.338 - - - - - - - - - - - - Various A - - - - - 11.574 - - 26.732 - - 16.206 - - - - - 16.206 Subtotal: Various - - - - - 15.912 - - 26.732 - - 16.206 - - - - - 16.206 Total - - - - - 15.912 - - 26.732 - - 16.206 - - - - - 16.206 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: For FY 2027, Support Equipment Less Than 5M procures low cost new, modified, or replacement support equipment, to include facilities and other equipment to support programmed depot maintenance capability activation. These support equipment procurement activities cover replacement and modernization of unavailable or unsupportable aged and obsolete equipment which cannot be procured using operations and maintenance funding. These costs also fall below the threshold for a stand-alone MMIII programs. This effort provides support equipment to enable refurbishment efforts for component and system life extensions to maintain the MMIII weapon system effectiveness and reliability until LGM-35A Sentinel fields. Support equipment investments will increase as aging and obsolescent equipment is identified that cannot last until Sentinel's deployment date. LI 00099L - Missile Replacement Eq-Ballistic Air Force UNCLASSIFIED Page 4 of 8 P-1 Line #1 Volume 1 - 4 === page 35 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 00099L / Missile Replacement Eq-Ballistic Appropriation / Budget Activity / Budget Sub Activity: 3020F / 01 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Higher Authority Communications Test System (HACTS 2.0) MDAP/MAIS Code: FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - - Gross/Weapon System Cost ($ in Millions) - - 0.000 - - - Less PY Advance Procurement ($ in Millions) - - 0.000 - - - Net Procurement (P-1) ($ in Millions) - - 0.000 - - - Plus CY Advance Procurement ($ in Millions) - - 2.166 - - - Total Obligation Authority ($ in Millions) - - 2.166 - - - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Higher Authority Communications Test System (HACTS 2.0) Cost Non Recurring Cost Circuit Card Assembly - - - - - - - - 0.000 - - - - - - - - - Subtotal: Non Recurring Cost - - - - - - - - 0.000 - - - - - - - - - Subtotal: Hardware - Higher Authority Communications Test System (HACTS 2.0) Cost - - - - - - - - 0.000 - - - - - - - - - Gross/Weapon System Cost - - - - - - - - 0.000 - - - - - - - - - Remarks: AP remark on P-10 LI 00099L - Missile Replacement Eq-Ballistic Air Force UNCLASSIFIED Page 5 of 8 P-1 Line #1 Volume 1 - 5 === page 36 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 00099L / Missile Replacement Eq-Ballistic Appropriation / Budget Activity / Budget Sub Activity: 3020F / 01 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: Higher Authority Communications Test System (HACTS 2.0) FY 2027 Base Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) HACTS 2.0 HACTS 2.0 Production A - - - - - - - - - - - 0.500 - - - - - 0.500 Subtotal: HACTS 2.0 - - - - - - - - - - - 0.500 - - - - - 0.500 Total - - - - - - - - - - - 0.500 - - - - - 0.500 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: - Higher Authority Communications Test System (HACTS 2.0): Program replaces obsolete/unsupportable communication system test equipment. This effort adds the Weapon System Control Element (WSCE) simulator, moves to DoW mandated OS standard, and pushes through an Authority to Operate (ATO) with cybersecurity - FY2026 Advanced Procurement funding is for purchase of long lead items. Up to 81 week lead time - FY2027 funds production activities such as labor, fees and production/installation costs for 13 test systems. Production will also include refurbishment of 2 EMD units to configuration - This requirement (or modification) supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D LI 00099L - Missile Replacement Eq-Ballistic Air Force UNCLASSIFIED Page 6 of 8 P-1 Line #1 Volume 1 - 6 === page 37 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 00099L / Missile Replacement Eq-Ballistic Appropriation / Budget Activity / Budget Sub Activity: 3020F / 01 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2026 Total Cost ($ M) Unit Cost ($ M) Qty (Each) Aggregated Items Title: Little Mountain Test Facility (LMTF) Supt/ Eqp FY 2027 Base Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) Little Mountain Test Facility (LMTF) Support Equipment Little Mountain Test Facility (LMTF) Support Equipment A - - - - - 6.700 - - 7.000 - - 10.000 - - - - - 10.000 Subtotal: Little Mountain Test Facility (LMTF) Support Equipment - - - - - 6.700 - - 7.000 - - 10.000 - - - - - 10.000 Total - - - - - 6.700 - - 7.000 - - 10.000 - - - - - 10.000 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: - The integrity of Little Mountain Test Facility's (LMTF) operational testing is jeopardized by critical radiation, electromagnetic, and shock and vibration testing equipment that has aged beyond its expected lifespan, creating significant vulnerabilities. Funding to replace this aging equipment is essential to avoid schedule slippage and ensure LMTF's continued ability to perform its mission, safeguarding long-term program viability - FY2026 funding for LMTF Support Equipment Replacement, to include equipment for the radiation lab, including Large Flash X- Ray (LFXR) with SLEP one integration and fielding by end of FY26. Round 2 LFXR SLEP to award by EOY FY26 (integration and fielding ~late FY28) followed by rounds 3 and 4 to execute in ~late FY27 and FY29. - FY2027 planned equipment updates, replacements, and service life extensions include and are not limited to Shaker test stand updates, electromagnetic pulse test stand acquisitions, and environmental test chamber updates and acquisitions. - This requirement (or modification) supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D LI 00099L - Missile Replacement Eq-Ballistic Air Force UNCLASSIFIED Page 7 of 8 P-1 Line #1 Volume 1 - 7 === page 38 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 00099L / Missile Replacement Eq-Ballistic Appropriation / Budget Activity / Budget Sub Activity: 3020F / 01 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2026 Total Cost ($ M) Unit Cost ($ M) Qty (Each) Aggregated Items Title: Payload Transporter Replacement (PTR) FY 2027 Base Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) LGM-30G LGM-30G Payload Transporter Replacement (PTR) A - - - - - 14.721 - - 1.384 - - 0.300 - - - - - 0.300 Subtotal: LGM-30G - - - - - 14.721 - - 1.384 - - 0.300 - - - - - 0.300 Total - - - - - 14.721 - - 1.384 - - 0.300 - - - - - 0.300 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: The PTR program provides a nuclear certified tractor and trailer to emplace, extract, and transport the reentry system, Propulsion System Rocket Engine, and guidance systems. Replaces the current payload transporter to meet United States Strategic Command (USSTRATCOM) security requirements and addresses supportability issues. The PTR program will update existing drawings, specifications, and technical orders to eliminate parts obsolescence and address the intended usage through fielding of the Sentinel Weapons System. PTR achieved RAA/IOC on 17 Dec 24. Delivery schedule for units 21 through 24: Unit 21: Accepted Feb 26; Delivery to Minot AFB Apr 26 Unit 22: Acceptance expected May 26; Delivery to Vandenberg SFB Aug 26 Unit 23: Acceptance expected Jul 26; Delivery to Vandenberg SFB Aug 26 Unit 24: Acceptance expected Nov 26; Delivery to Minot AFB Dec 26 This requirement (or modification) supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. LI 00099L - Missile Replacement Eq-Ballistic Air Force UNCLASSIFIED Page 8 of 8 P-1 Line #1 Volume 1 - 8 === page 39 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 01: Ballistic Missiles / BSA 3: Missile Replacement Equipment - Ballistic P-1 Line Item Number / Title: 00099L / Missile Replacement Eq-Ballistic Program Elements for Code B Items: N/A Other Related Program Elements: 0101213F Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Gross/Weapon System Cost ($ in Millions) - 0.000 2.166 0.000 - 0.000 0.000 0.000 0.000 0.000 - 2.166 Net Procurement (P-1) ($ in Millions) - 0.000 2.166 0.000 - 0.000 0.000 0.000 0.000 0.000 - 2.166 Total Obligation Authority ($ in Millions) - 0.000 2.166 0.000 - 0.000 0.000 0.000 0.000 0.000 - 2.166 Description: Higher Authority Command Test System (HACTS) 2.0 Program replaces obsolete/unsupportable communication system test equipment. This effort adds the Weapon System Control Element (WSCE) simulator, moves to DoD mandated OS standard enabling Authority to Operate (ATO) with cybersecurity, and for advance procurement of long-lead materials to meet hardware assembly. In order to save 81 weeks of schedule, HACTS 2.0 requested FY2026 AP to order long lead materials prior to EMD completion and begin assembly as forecasted in 1QFY28. Lead times range from 31-81 weeks, any items not procured with AP will result in a minimum of 12 months delay. LI 00099L - Missile Replacement Eq-Ballistic Air Force UNCLASSIFIED Page 1 of 4 P-1 Line #2 Volume 1 - 9 === page 40 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 01: Ballistic Missiles / BSA 3: Missile Replacement Equipment - Ballistic P-1 Line Item Number / Title: 00099L / Missile Replacement Eq-Ballistic Program Elements for Code B Items: N/A Other Related Program Elements: 0101213F Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-10 Higher Authority Communications Test System (HACTS 2.0) - / - P-40 Total Gross/Weapon System Cost - / - - / - - / 2.166 / 0.000 - / 2.166 - / - - / - / 0.000 - / - - / / 0.000 *Title represents the P-10 Title for Advance Procurement. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: • Higher Authority Communication Test System (HACTS) 2.0 FY2026 Advance Procurement funding will allow HACTS 2.0 to purchase production material that have up to 81 weeks lead times. Material is identified on the following P-10. No FY2027 Advance Procurement is requested. LI 00099L - Missile Replacement Eq-Ballistic Air Force UNCLASSIFIED Page 2 of 4 P-1 Line #2 Volume 1 - 10 === page 41 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Air Force Date: April 2026 P-1 Line Item Number / Title: 00099L / Missile Replacement Eq-Ballistic Appropriation / Budget Activity / Budget Sub Activity: 3020F / 01 / 3 First System (2027) Award Date: March 2026 First System (2027) Completion Date: February 2028 Higher Authority Communications Test System (HACTS 2.0) Production Leadtime Quantity Interval Between Systems: 8 Months Prior Years (Months) FY 2025 (Each) 3 Cost Elements When Required FY 2026 (Each) Prior Years (Months) P-5 Number / Title: Higher Authority Communications Test System (HACTS 2.0) FY 2025 ($ M) FY 2027 (Each) (Each) FY 2026 ($ M) FY 2027 ($ M) ($ M) CFE Circuit Card Assembly 19 - - 0.213 - Card Cage Enclosure 19 - - 0.338 - C/A EL- Signal 19 - - 0.057 - Miscelanous 19 - - 1.558 - Total: CFE - - 2.166 - Total Advance Procurement/Obligation Authority - - 2.166 - LI 00099L - Missile Replacement Eq-Ballistic Air Force UNCLASSIFIED Page 3 of 4 P-1 Line #2 Volume 1 - 11 === page 42 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Air Force Date: April 2026 Appropriation / Budget Activity / Budget Sub Activity: 3020F / 01 / 3 P-1 Line Item Number / Title: 00099L / Missile Replacement Eq-Ballistic P-5 Number / Title: Higher Authority Communications Test System (HACTS 2.0) FY 2027 Cost Elements Production Leadtime QPA (Months) (Each) Unit Cost ($ M) Contract Forecast Date 2027 Qty (Each) For FY Total Cost Request ($ M) CFE Circuit Card Assembly - - Card Cage Enclosure - - C/A EL- Signal - - Miscelanous - - Total: CFE - Total Advance Procurement/Obligation Authority - Description: No Advance Procurement funding is required in FY 2027. In order to save 81 weeks of schedule, HACTS 2.0 requested FY2026 AP to order long lead materials prior to EMD completion and begin assembly as forecasted in 1QFY28. Lead times range from 31-81 weeks. Advance procurement is urgently needed to maintain the operational status of the current HACTS system, the platform for certifying mandated bi-annual Launch Control Center (LCC) updates. Failure to do so will result in LCCs operating with out-of-date software, potentially leading to target synchronization errors, inability to decrypt launch execution messages and misalignment with the Nuclear Triad. Delaying procurement of Cables, Terminal Boards, and Connectors introduces significant obsolescence risk, potentially requiring a costly system redesign, impacting targeting capabilities and timing requirements, thus jeopardizing national security. LI 00099L - Missile Replacement Eq-Ballistic Air Force UNCLASSIFIED Page 4 of 4 P-1 Line #2 Volume 1 - 12 === page 43 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 01: Ballistic Missiles / BSA 4: Ballistic Missiles ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: MGBSD0 / Ground Based Strategic Deterrent Program Elements for Code B Items: 0101233F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 493 Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - Procurement Quantity (Units in Each) - - - Gross/Weapon System Cost ($ in Millions) - 0.000 0.742 Less PY Advance Procurement ($ in Millions) - 0.000 Net Procurement (P-1) ($ in Millions) - 0.000 7.182 0.000 - 0.000 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 110.822 - 110.822 243.234 1,377.948 0.742 3.220 - 3.220 3.220 0.000 0.000 107.602 - 107.602 240.014 1,377.948 0.000 0.000 - 0.000 0.000 0.000 0.000 107.602 - 107.602 240.014 1,377.948 1,916.165 To FY 2031 Complete - Total - - 2,804.152 0.000 6,453.063 0.000 0.000 0.000 7.182 1,916.165 2,804.152 0.000 6,445.881 0.000 0.000 0.000 7.182 1,916.165 2,804.152 0.000 6,453.063 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The Secretary of War's Nunn-McCurdy decision on July 8, 2024, recertified the LGM-35A Sentinel program. The Milestone Decision Authority rescinded the 2020 Milestone B decision which allows the Program Office to focus on the reassessment and refinement of requirements as they translate to system specifications, technical maturation of the system design, and cost and schedule risk mitigation strategies. The Program Office is working with stakeholders to update program requirements, quantities, and milestones to align with the outcomes of the reassessments and refinements. The GBSD program has been designated as the LGM-35A Sentinel. The LGM-35A Sentinel weapon system, being developed in the Sentinel Systems Program Office of the ICBM Systems Directorate, incorporates the Sentinel weapon system which is called out in related ICBM Systems Directorate portfolio programs that includes Intercontinental Ballistic Missile (ICBM) Reentry Vehicles and ICBM Fuze Modernization. The LGM-35A Sentinel will produce and deploy a replacement for the current Minuteman III (MM III) Intercontinental Ballistic Missile (ICBM) weapon system to maintain a safe, secure, reliable, and effective nuclear deterrent. The LGM-35A Sentinel program delivers a fully integrated weapon system to lower lifecycle costs and to close key capability gaps and vulnerabilities identified in the LGM-35A Sentinel Capabilities Based Assessment, LGM-35A Sentinel Capabilities Development Document, and the LGM-35A Sentinel Analysis of Alternatives. Sentinel mitigates ground based deterrent degradation due to MM III component age-out and attrition. The LGM-35A Sentinel program includes prime contractor development of applicable support equipment, data, flight test hardware and infrastructure, and training systems material, as well as examination and mitigation of risk during the MM III to LGM-35A Sentinel transition. This program includes nuclear surety certification and system vulnerability assessments. The LGM-35A Sentinel AVE consists of a boost propulsion subsystem; a post-boost propulsion subsystem; a guidance, navigation, and control (GN&C) subsystem; and a re-entry subsystem. The boost propulsion subsystem is comprised of a 3-stage solid rocket booster. The post-boost propulsion subsystem (PBPS) is comprised of a liquid-fueled rocket propulsion system integrated into a post-boost attitude control module (PBACM) structure, as well as all guidance, navigation, and control components. The LGM-35A Sentinel program will procure weapon system launch capabilities which are fully integrated into LGM-35A Sentinel facilities, ensuring full operational readiness. These capabilities include the procurement of weapon system components for the launch silos, launch centers, and other key weapon system command and launch requirements. Milestone dates are subject to change due to acquisition strategy revisions. The event schedule updates will be provided once the revisions are completed. The FY 2026 spend plan amount for GBSD includes $0 thousand of discretionary and $176,000 thousand of mandatory (reconciliation) for a total of $176,000 thousand. The FY 2026 mandatory funding is designated for the life-of-program-buy (LOPB) for the purchase and processing of rayon fabric for use on Sentinel's solid rocket motor nozzles. LI MGBSD0 - Ground Based Strategic Deterrent Air Force UNCLASSIFIED Page 1 of 4 P-1 Line #3 Volume 1 - 13 === page 44 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 01: Ballistic Missiles / BSA 4: Ballistic Missiles ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: MGBSD0 / Ground Based Strategic Deterrent Program Elements for Code B Items: 0101233F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 493 Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. Funding for this exhibit is contained in PE 0101233F. LI MGBSD0 - Ground Based Strategic Deterrent Air Force UNCLASSIFIED Page 2 of 4 P-1 Line #3 Volume 1 - 14 === page 45 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 01: Ballistic Missiles / BSA 4: Ballistic Missiles ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: MGBSD0 / Ground Based Strategic Deterrent Program Elements for Code B Items: 0101233F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 493 Exhibits Schedule Exhibit Type Title* P-5 Ground Based Strategic Deterrent P-40 Total Gross/Weapon System Cost Subexhibits ID CD B MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 0.000 - / 0.742 - / 110.822 - / - - / 110.822 - / - - / 0.000 - / 0.742 - / 110.822 - / - - / 110.822 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding is required to conduct initial site activities for the F.E. Warren Air Force Base Operational Wing Workforce Hub Operational Site Activation (OSA) as the LGM-35A Sentinel prepares for its weapon system deployment. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues identified during further weapon system design refinement. LI MGBSD0 - Ground Based Strategic Deterrent Air Force UNCLASSIFIED Page 3 of 4 P-1 Line #3 Volume 1 - 15 === page 46 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: MGBSD0 / Ground Based Strategic Deterrent Appropriation / Budget Activity / Budget Sub Activity: 3020F / 01 / 4 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: Ground Based Strategic Deterrent MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 Procurement Quantity (Units in Each) - - - Gross/Weapon System Cost ($ in Millions) - 0.000 0.742 Less PY Advance Procurement ($ in Millions) - 0.000 Net Procurement (P-1) ($ in Millions) - 0.000 7.182 0.000 - 0.000 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - - FY 2027 Total - 110.822 - 110.822 0.742 3.220 - 3.220 0.000 107.602 - 107.602 0.000 0.000 - 0.000 0.000 107.602 - 107.602 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - LGM-35A Sentinel Cost Recurring Cost LGM-35A Sentinel - - - - - 0.000 - - 0.742 - - 110.822 - - - - - 110.822 Subtotal: Recurring Cost - - - - - 0.000 - - 0.742 - - 110.822 - - - - - 110.822 Subtotal: Hardware LGM-35A Sentinel Cost - - - - - 0.000 - - 0.742 - - 110.822 - - - - - 110.822 Gross/Weapon System Cost - - - - - 0.000 - - 0.742 - - 110.822 - - - - - 110.822 LI MGBSD0 - Ground Based Strategic Deterrent Air Force UNCLASSIFIED Page 4 of 4 P-1 Line #3 Volume 1 - 16 === page 47 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 01: Ballistic Missiles / BSA 4: Ballistic Missiles ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: MK21A0 / Mk21A Reentry Vehicle Program Elements for Code B Items: 0101328F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 576 Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - Total Procurement Quantity (Units in Each) - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 26.156 0.000 0.000 - 0.000 0.000 0.000 65.390 Less PY Advance Procurement ($ in Millions) - 0.000 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Net Procurement (P-1) ($ in Millions) - 26.156 0.000 0.000 - 0.000 0.000 0.000 65.390 136.744 2,312.810 2,541.100 Plus CY Advance Procurement ($ in Millions) - 0.000 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 0.000 0.000 Total Obligation Authority ($ in Millions) - 26.156 0.000 0.000 - 0.000 0.000 0.000 65.390 136.744 2,312.810 2,541.100 119.020 136.744 426 426 2,312.810 2,541.100 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - 7.463 12.191 12.428 86.938 Flyaway Unit Cost ($ in Millions) - - - - - - - - - - 5.095 - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - 5.429 5.965 Description: The Mk21A Reentry Vehicle (RV) program will design, develop, produce, and deploy an integrated RV capable of delivering the W87-1 warhead when released from the LGM-35A Sentinel weapon system. The Mk21A program will provide needed performance and security enhancements over the Mk21 RV to meet the upgraded requirements for the Department of Energy/National Nuclear Security Administration W87-1 warhead, while ensuring the time-certain delivery of both the W87-1 and Mk21A programs. The Mk21A will also meet the requirements laid out in the LGM-35A Sentinel weapon system Capability Development Document (CDD) as directed by Air Force Global Strike Command. The Mk21A RV includes: shape stable nose tip; high impulse transducer; arming and fuzing subsystem (AFS); aeroshell forward section, body section, and rear cover; radio frequency subsystem with antennas; RV spin subsystem; in-flight disconnect cable; and other electrical cables. Heatshield Life of Type Buy (LOTB): In FY 2025, the Air Force executed a LOTB to procure and process the heatshield materials to reduce supplier risks in the industrial base. Funding for this exhibit contained in PE 0101328F. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. LI MK21A0 - Mk21A Reentry Vehicle Air Force UNCLASSIFIED Page 1 of 3 P-1 Line #4 Volume 1 - 17 === page 48 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 01: Ballistic Missiles / BSA 4: Ballistic Missiles ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: MK21A0 / Mk21A Reentry Vehicle Program Elements for Code B Items: 0101328F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 576 Exhibits Schedule Exhibit Type Title* P-5 Mk21A Reentry Vehicle P-40 Total Gross/Weapon System Cost Subexhibits ID CD B MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 26.156 - / 0.000 - / 0.000 - / - - / 0.000 - / - - / 26.156 - / 0.000 - / 0.000 - / - - / 0.000 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: No FY2027 funding requested LI MK21A0 - Mk21A Reentry Vehicle Air Force UNCLASSIFIED Page 2 of 3 P-1 Line #4 Volume 1 - 18 === page 49 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: MK21A0 / Mk21A Reentry Vehicle Appropriation / Budget Activity / Budget Sub Activity: 3020F / 01 / 4 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: Mk21A Reentry Vehicle MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 26.156 0.000 0.000 - 0.000 Less PY Advance Procurement ($ in Millions) - 0.000 0.000 0.000 - 0.000 Net Procurement (P-1) ($ in Millions) - 26.156 0.000 0.000 - 0.000 Plus CY Advance Procurement ($ in Millions) - 0.000 0.000 0.000 - 0.000 Total Obligation Authority ($ in Millions) - 26.156 0.000 0.000 - 0.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.000 0.000 0.000 - 0.000 Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Flyaway - Mk21A Reentry Vehicle Cost Recurring Cost - - - - - - - - 0.000 - - 0.000 - - - - - 0.000 Subtotal: Recurring Cost Mk21A - - - - - - - - 0.000 - - 0.000 - - - - - 0.000 Subtotal: Flyaway - Mk21A Reentry Vehicle Cost - - - - - - - - 0.000 - - 0.000 - - - - - 0.000 Hardware - Mk21A Reentry Vehicle Cost Non Recurring Cost Heatshield Material - - - - - 26.156 - - - - - - - - - - - - Subtotal: Non Recurring Cost - - - - - 26.156 - - - - - - - - - - - - Subtotal: Hardware - Mk21A Reentry Vehicle Cost - - - - - 26.156 - - - - - - - - - - - - Gross/Weapon System Cost - - - - - 26.156 - - 0.000 - - 0.000 - - - - - 0.000 LI MK21A0 - Mk21A Reentry Vehicle Air Force UNCLASSIFIED Page 3 of 3 P-1 Line #4 Volume 1 - 19 === page 50 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 20 === page 51 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: MLRSO1 / Long Range Stand-Off Weapon Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 1: Strategic ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0101238F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 489 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - 98.270 70.335 131.372 646.047 - 646.047 855.662 1,729.190 To FY 2031 Complete - Total - - 2,071.236 3,031.164 3,127.374 11,760.650 - 0.000 0.000 140.000 - 140.000 210.000 456.810 832.544 1,073.431 1,656.033 4,368.818 98.270 70.335 131.372 506.047 - 506.047 645.662 1,272.380 1,238.692 1,957.733 1,471.341 7,391.832 - 140.000 210.000 456.810 - 456.810 832.544 1,073.431 1,086.478 569.555 98.270 210.335 341.372 962.857 - 962.857 1,478.206 2,345.811 2,325.170 2,527.288 1,471.341 4,368.818 11,760.650 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The purpose of this program is to conduct and support United States Air Force (USAF) and Joint Department of War (DoW) / Department of Energy (DOE) acquisition activities for the modernization of nuclear weapons. The Long Range Stand-Off (LRSO) Cruise Missile is a long-range survivable stand-off weapon capable of delivering lethal nuclear effect on strategic targets. The LRSO weapon system will replace the currently fielded Air Launched Cruise Missile (ALCM) and will be integrated on both legacy and future bomber aircraft. The LRSO weapon system will be capable of penetrating and surviving advanced Integrated Air Defense Systems (IADS) from significant stand-off range to prosecute strategic targets in support of the Air Forces global attack capability and strategic deterrence core function. Threshold and objective aircraft are defined in the programs Capabilities Development Document (CDD) approved by the Joint Requirements Oversight Council (JROC) in August 2020. Funds may be used to address emerging or short-notice Diminishing Manufacturing Sources and Material Shortage (DMSMS), and supply chain issues. The program is conducting Engineering and Manufacturing Development (EMD) tasks to meet validated requirements to support Developmental and Operational Testing and Production Readiness. The LRSO program will include prime contractor development and production /delivery of cruise missiles, applicable support equipment, data, flight test hardware and infrastructure, and training systems while examining and mitigating risk during the ALCM to LRSO transition. The program includes necessary nuclear surety and certification activities, and vulnerability assessments. FY2027 procurement funds are required to purchase ancillary equipment, warhead support equipment and field trainers required to be in place for Initial Nuclear Surety Inspection (INSI). The INSI must be accomplished prior to fielding the weapon system and attaining Initial Operational Capability. FY2027 procurement funds will be used to purchase components required for Radiation Lot Acceptance Testing (RLAT) in conjunction with the long lead components purchased with Advance Procurement. Additionally, FY2027 procurement funds will be used for activities related to RLAT and Advance Procurement. FY2027 funds will be used for the first and second modification ship-sets of Bomber Weapon Interface Equipment (BWIE). The BWIE is aircraft support equipment for LRSO integration on the threshold platform to enable operational employment. FY2026 Advanced Procurement funding also address RLAT and BWIE efforts. LI MLRSO1 - Long Range Stand-Off Weapon Air Force UNCLASSIFIED Page 1 of 5 P-1 Line #5 Volume 1 - 21 === page 52 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 1: Strategic ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: MLRSO1 / Long Range Stand-Off Weapon Program Elements for Code B Items: 0101238F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 489 The engineering change order (ECO) costs are associated with addressing known and unknown DMSMS and supply chain issues. Advance procurement is required for the purchase of long lead items for the LRSO cruise missile prior to entry into Milestone C. Funding for this exhibit contained in PE 0101238F. LI MLRSO1 - Long Range Stand-Off Weapon Air Force UNCLASSIFIED Page 2 of 5 P-1 Line #5 Volume 1 - 22 === page 53 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 1: Strategic ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: MLRSO1 / Long Range Stand-Off Weapon Program Elements for Code B Items: 0101238F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 489 Exhibits Schedule Exhibit Type Title* P-5 Long Range Stand-Off Weapon P-40 Total Gross/Weapon System Cost Subexhibits ID CD B MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 98.270 - / 70.335 - / 131.372 - / 646.047 - / - - / 646.047 - / 98.270 - / 70.335 - / 131.372 - / 646.047 - / - - / 646.047 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 procurement funds will award Lot 1 contract to include remaining components not procured by advance procurement, as well as ancillary equipment, warhead support equipment and field trainers required to be in place for initial Nuclear Surety Inspection (INSI). The INSI must be accomplished prior to fielding the weapon system and attaining Initial Operational Capability. Funds may be used to address emerging or short notice Diminishing Manufacturing Sources and Material Shortage (DMSMS), and supply chain issues. The Air Force is making a Life of Program Buy through the Department of Energy (DOE) for support equipment and handling items associated with the warhead. Additional detailed information is classified and can be provided at higher classification levels. LI MLRSO1 - Long Range Stand-Off Weapon Air Force UNCLASSIFIED Page 3 of 5 P-1 Line #5 Volume 1 - 23 === page 54 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: MLRSO1 / Long Range Stand-Off Weapon Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: Long Range Stand-Off Weapon MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 - - 98.270 70.335 FY 2027 Base FY 2027 OOC - - - FY 2027 Total - 131.372 646.047 - 646.047 - 0.000 0.000 140.000 - 140.000 98.270 70.335 131.372 506.047 - 506.047 - 140.000 210.000 456.810 - 456.810 98.270 210.335 341.372 962.857 - 962.857 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Long Range Stand-Off Weapon Cost Recurring Cost All-UP-Round - - - - - - - - - - - 262.035 - - - - - 262.035 - - - - - - - - - - - 262.035 - - - - - 262.035 Engineering Change Orders - - 38.847 - - 19.288 - - - - - 65.478 - - - - - 65.478 RLAT - - - - - 5.044 - - - - - - - - - - - - Subtotal: Non Recurring Cost - - 38.847 - - 24.332 - - - - - 65.478 - - - - - 65.478 Subtotal: Hardware - Long Range Stand-Off Weapon Cost - - 38.847 - - 24.332 - - - - - 327.513 - - - - - 327.513 Subtotal: Recurring Cost Non Recurring Cost Ancillary Equipment - Long Range Stand-Off Weapon Cost Non Recurring Cost Warhead Trainers and Support Equipment - - 59.423 - - 35.447 - - 12.648 - - 52.022 - - - - - 52.022 Missile Trainers - - - - - - - - - - - 20.905 - - - - - 20.905 Peculiar Support Equipment - - - - - - - - - - - 16.584 - - - - - 16.584 Tooling & Test Equipment - - - - - 3.657 - - - - - 117.216 - - - - - 117.216 Bomber Weapon Interface Equipment (BWIE) - - - - - - - - - - 44.465 - - - - - 44.465 LI MLRSO1 - Long Range Stand-Off Weapon Air Force 102.511 UNCLASSIFIED Page 4 of 5 P-1 Line #5 Volume 1 - 24 === page 55 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: MLRSO1 / Long Range Stand-Off Weapon Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 1 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: Long Range Stand-Off Weapon MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Subtotal: Non Recurring Cost Subtotal: Ancillary Equipment - Long Range Stand-Off Weapon Cost Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) - - 59.423 - - 39.104 - - 115.159 - - 251.192 - - - - - 251.192 - - 59.423 - - 39.104 - - 115.159 - - 251.192 - - - - - 251.192 Support - Long Range Stand-Off Weapon Cost Program Support - - - - - 1.702 - - 0.110 - - 8.722 - - - - - 8.722 Contractor Support - - - - - 5.197 - - 16.103 - - 58.620 - - - - - 58.620 Subtotal: Support - Long Range Stand-Off Weapon Cost - - - - - 6.899 - - 16.213 - - 67.342 - - - - - 67.342 Gross/Weapon System Cost - - 98.270 - - 70.335 - - 131.372 - - 646.047 - - - - - 646.047 Remarks: Bomber Weapon Interface Equipment (BWIE) was identified in the incorrect Funding Category. Moved from Hardware Non-Recurring to Ancillary Equipment Non-Recurring. LI MLRSO1 - Long Range Stand-Off Weapon Air Force UNCLASSIFIED Page 5 of 5 P-1 Line #5 Volume 1 - 25 === page 56 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 26 === page 57 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 1: Strategic P-1 Line Item Number / Title: MLRSO1 / Long Range Stand-Off Weapon Program Elements for Code B Items: 0101238F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 489 Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Gross/Weapon System Cost ($ in Millions) - 140.000 210.000 456.810 - 456.810 832.544 1,073.431 1,086.478 569.555 - 4,368.818 Net Procurement (P-1) ($ in Millions) - 140.000 210.000 456.810 - 456.810 832.544 1,073.431 1,086.478 569.555 - 4,368.818 Total Obligation Authority ($ in Millions) - 140.000 210.000 456.810 - 456.810 832.544 1,073.431 1,086.478 569.555 - 4,368.818 Description: The purpose of this program is to conduct and support United States Air Force (USAF) and Joint Department of War (DoW) / Department of Energy (DOE) acquisition activities for the modernization of nuclear weapons. The Long Range Stand-Off (LRSO) Cruise Missile is a long-range survivable stand-off weapon capable of delivering lethal nuclear effect on strategic targets. The LRSO weapon system will replace the currently fielded Air Launched Cruise Missile (ALCM) and will be integrated on both legacy and future bomber aircraft. The LRSO weapon system will be capable of penetrating and surviving advanced Integrated Air Defense Systems (IADS) from significant stand-off range to prosecute strategic targets in support of the Air Force's global attack capability and strategic deterrence core function. FY2027 Advance Procurement (AP) needed to acquire critical components to support Lot 3 production schedule. Threshold and objective aircraft are defined in the program's Capabilities Development Document (CDD) approved by the Joint Requirements Oversight Council (JROC) in August 2020. Funds may be used to address emerging or short-notice Diminishing Manufacturing Sources and Material Shortage (DMSMS), and supply chain issues. The program is conducting Engineering and Manufacturing Development (EMD) tasks to meet validated requirements to support Developmental and Operational Testing and Production Readiness. The LRSO program will include prime contractor development and production/delivery of cruise missiles, applicable support equipment, data, flight test hardware and infrastructure, and training systems while examining and mitigating risk during the ALCM to LRSO transition. The program includes necessary nuclear surety and certification activities, and vulnerability assessments. "Full funding for every end item requesting advance procurement is included in the budget submission. Funding for this exhibit contained in PE 0101238F. LI MLRSO1 - Long Range Stand-Off Weapon Air Force UNCLASSIFIED Page 1 of 4 P-1 Line #6 Volume 1 - 27 === page 58 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 1: Strategic P-1 Line Item Number / Title: MLRSO1 / Long Range Stand-Off Weapon Program Elements for Code B Items: 0101238F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 489 Exhibits Schedule Exhibit Type Title* ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-10 Long Range Stand-Off Weapon - / - - / 140.000 - / 210.000 - / 456.810 - / - - / 456.810 P-40 Total Gross/Weapon System Cost - / - - / 140.000 - / 210.000 - / 456.810 - / - - / 456.810 *Title represents the P-10 Title for Advance Procurement. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The LRSO program has achieved MS B and has entered Engineering and Manufacturing Development (EMD). This program is conducting EMD tasks to verify and validate requirements prior to production initiation and includes necessary nuclear surety and certification activities and vulnerability assessments. FY2027 long-lead purchases are required for Lot 3 production award planned for FY2029, as well as subsequent nuclear certification activities required prior to IOC. Additional detailed information is classified and can be provided at higher classification levels. For further information, please contact SAF/AQPN. LI MLRSO1 - Long Range Stand-Off Weapon Air Force UNCLASSIFIED Page 2 of 4 P-1 Line #6 Volume 1 - 28 === page 59 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Air Force Date: April 2026 P-1 Line Item Number / Title: MLRSO1 / Long Range Stand-Off Weapon Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 1 First System (2027) Award Date: February 2027 First System (2027) Completion Date: April 2029 Long Range Stand-Off Weapon Production Leadtime Quantity Interval Between Systems: 1 Months Prior Years (Months) FY 2025 (Each) 24 When Required Cost Elements FY 2026 (Each) Prior Years (Months) P-5 Number / Title: Long Range Stand-Off Weapon FY 2025 ($ M) FY 2027 (Each) (Each) FY 2026 ($ M) FY 2027 ($ M) ($ M) CFE (†) 24 - 27.017 40.525 88.153 24 - 23.019 34.529 75.109 24 - 6.900 10.349 22.513 24 - 55.433 83.149 180.872 24 - 27.631 41.448 90.163 Total: CFE - 140.000 210.000 456.810 Total Advance Procurement/Obligation Authority - 140.000 210.000 456.810 MLRSO1 AP: Airframe MLRSO1 AP: Propulsion (†) MLRSO1 AP: Power and Distribution (†) MLRSO1 AP: Guidance Navigation Control MLRSO1 AP: Classified Components (†) (†) LI MLRSO1 - Long Range Stand-Off Weapon Air Force UNCLASSIFIED Page 3 of 4 P-1 Line #6 Volume 1 - 29 === page 60 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Air Force Date: April 2026 Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 1 P-1 Line Item Number / Title: MLRSO1 / Long Range Stand-Off Weapon P-5 Number / Title: Long Range Stand-Off Weapon FY 2027 Cost Elements Production Leadtime QPA (Months) (Each) Unit Cost ($ M) Contract Forecast Date 2027 Qty (Each) For FY Total Cost Request ($ M) CFE MLRSO1 AP: Airframe (†) MLRSO1 AP: Propulsion (†) MLRSO1 AP: Power and Distribution (†) MLRSO1 AP: Guidance Navigation Control MLRSO1 AP: Classified Components (†) (†) - 2029 88.153 - 2029 75.109 - 2029 22.513 - 2029 180.872 - 2029 90.163 Total: CFE 456.810 Total Advance Procurement/Obligation Authority 456.810 Description: Advance procurement is required for the purchase of long lead items for the LRSO cruise missile prior to year of contract award. The production lead time for long lead components varies from 18-24 months. The advance procurement funding for all components has a forecasted contract award date of March 2027 (FY2027 AP). Due to classification level, we are unable to provide all data in this document. Additional details provided upon request through appropriate channels. (†) indicates the presence of Contract Data presented in the associated P-5 Item's P-5a exhibit. LI MLRSO1 - Long Range Stand-Off Weapon Air Force UNCLASSIFIED Page 4 of 4 P-1 Line #6 Volume 1 - 30 === page 61 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 222000 / Replac Equip & War Consumables Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 6.533 12.436 23.575 - 23.575 1.517 1.545 1.573 1.604 - 48.783 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 6.533 12.436 23.575 - 23.575 1.517 1.545 1.573 1.604 - 48.783 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 6.533 12.436 23.575 - 23.575 1.517 1.545 1.573 1.604 - 48.783 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Common Munitions BIT Reprogramming Equipment (CMBRE) Cyber Enhanced (CE) is a critical program replacing a legacy system fielded in the 1990s utilizing floppy drives and a DOS/Win XP operating system. The CMBRE CE program will mitigate the effects and risk associated with a growing list of 20+ obsolete components, outdated technology, and insufficient cybersecurity outlined in Red Team and POA&M findings in order to sustain current capabilities. CMBRE SLEP will effectively support the 20+ smart munitions and weapon systems currently fielded for the warfighter today, as well as advanced systems currently in development. CMBRE SLEP is needed to verify weapons built-in test status, reprogram operational flight data, and up/download mission and GPS data. Cruise Missile Automatic Test System (CM-ATS) The CM-ATS is a nuclear certified tester designed to test the AGM-86 Cruise Missile fleet, the B-2 RLA, and associated Carrier Aircraft Equipment (CAE) used to launch missiles. Funding for this exhibit is contained in PE 0701212F. FY 2027 Funds are required for the Common Munitions BIT Reprogramming Equipment (CMBRE) Cyber Enhanced (CE) Program and the Cruise Missile Automatic Test System (CM-ATS). FY 2027 funding increase is due to increase in production hardware kits. The cost of Munitions Application Programs (MAPs) an average cost increase of 500K per Munitions Application Program (MAP) for established munitions and increases of up to 2M or more advanced/newer munitions. CMBRE system procurement costs have increased from originally estimated costs due to the inflated costs of CCA components, digital controller unit components, and assembly labor costs. Funds will be used to procure and recapitalize the ATS Product Group which consists of: Armament and Stores ATS and Software Loader/Verifier and Built-in-Test ATS to include proven commercial and/or Government off-the-shelf ATS to replace legacy and obsolete systems to ensure persistent logistics and enable agile combat employment. In direct support of SecWar's direction to increase readiness across the DoW, efforts within this PEC will be prioritized based on the National Defense Authorization Act (NDAA), USAF Force Design, Agile Combat Employment (ACE), and the Defense Planning Guide (DPG) These efforts will support work and collaboration efforts across the Combat Readiness Directorate in PE's 0708051F, 0701212F, 0702833F, 0604706F, 0605827F, 0202834F, 0502834F, 0502844F, 0208031F, 0401135F and 0207521F) -- to increase readiness across the Air Force Enterprise LI 222000 - Replac Equip & War Consumables Air Force UNCLASSIFIED Page 1 of 4 P-1 Line #7 Volume 1 - 31 === page 62 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 222000 / Replac Equip & War Consumables Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Replac Equip & War Consumables - / - - / 6.533 - / 12.436 - / 23.575 - / - - / 23.575 P-40 Total Gross/Weapon System Cost - / - - / 6.533 - / 12.436 - / 23.575 - / - - / 23.575 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 Funds are required for the Common Munitions BIT Reprogramming Equipment (CMBRE) Cyber Enhanced (CE) Program and the Cruise Missile Automatic Test System (CM-ATS). FY 2027 funding increase is due to increase in production hardware kits. The cost of Munitions Application Programs (MAPs) an average cost increase of $500 thousand per Munitions Application Program (MAP) for established munitions and increases of up to $2 million or more for advanced/newer munitions. CMBRE system procurement costs have increased from originally estimated costs due to the inflated costs of CCA components, digital controller unit components, and assembly labor costs. LRIP Production costs have also increased from what was originally estimated. Estimates from the Prototype Integration Facility (PIF) to complete production and slight increases in MAP procurement cost have caused FY26/27 numbers to increase. Funds will be used to procure and recapitalize the ATS Product Group which consists of: Armament and Stores ATS and Software Loader/Verifier and Built-in-Test ATS to include proven commercial and/or Government off-the-shelf ATS to replace legacy and obsolete systems to ensure persistent logistics and enable agile combat employment. Funds are required in order to upgrade the CMBRE CE and CM-ATS system. CMBRE is comprised of three major components that must be replaced: Digital Computer System Assembly (DCSA), Test Adapter Unit (TAU), and ADU. There will be no test capability for smart munitions and Bomber Rack Unit, BRU-61, for fighter aircraft if upgrades are not complete. CMBRE Tester is used to initiate built-in test (BIT), reprogram the Operational Flight Programs (OFPs) for MIL-STD-1760/Non-1760 smart bombs and missiles, upload mission planning, and upload/download Global Positioning System (GPS) crypto keys. CMBRE SLEP breaks vendor lock, allowing the Government to own full data rights and the technical data package (TDP). It also addresses obsolescence and cyber security issues. The CM-ATS is a nuclear certified tester designed to test the AGM-86 Cruise Missile fleet, the B-2 Rotary Launcher Assembly (RLA), and associated Carrier Aircraft Equipment (CAE) used to launch missiles. Funds will be utilized to procure common automatic test/support equipment items, Program Management Administration (PMA), and other government associated costs in support of installation and unit mission requirements for Air Force personnel. In direct support of SecWar's direction to increase readiness across the DoW, efforts within this PEC will be prioritized based on the National Defense Authorization Act (NDAA), USAF Force Design, Agile Combat Employment (ACE), and the Defense Planning Guide (DPG) These efforts will support work and collaboration efforts across the Combat Readiness Directorate in PE's 0708051F, 0701212F, 0702833F, 0604706F, 0605827F, 0202834F, 0502834F, 0502844F, 0208031F, 0401135F and 0207521F) -- to increase readiness across the Air Force Enterprise LI 222000 - Replac Equip & War Consumables Air Force UNCLASSIFIED Page 2 of 4 P-1 Line #7 Volume 1 - 32 === page 63 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 222000 / Replac Equip & War Consumables Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Replac Equip & War Consumables Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) ARMAMENT AND STORES CRUISE MISSILE ATS A Subtotal: ARMAMENT AND STORES - - - 0.991 - - - - 1 0.991 1.010 - 0.991 - - - - 1 1.010 - - 0.991 - - - - - 0.991 - 1.010 - - 0.991 - - - - - 0.991 - - 22.584 22.584 - - - 22.584 11.426 - - - - - - - - - SOFTWARE LOADER VERIFIER AUTOMATIC TEST SYSTEMS DCSA PRODUCTION UNITS (CMBRE CE / SLEP) A LRIP PRODUCTION A Munition Application Program (MAPs) (CMBFRE CE/SLEP) A ICS (CMBRE CE/ SLEP) A Program Management Administration (PMA) A CMBRE CONGRESSIONAL ADD A - - - - - - - 1.542 1 1.542 11.426 - - - 3.500 1 3.500 - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - 0.500 0.500 - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - Subtotal: SOFTWARE LOADER VERIFIER AUTOMATIC TEST SYSTEMS - - - - - 5.542 - - 11.426 - - 22.584 - - - - - 22.584 Total - - - - - 6.533 - - 12.436 - - 23.575 - - - - - 23.575 1 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. 1 1 1 22.584 Remarks: FY26-27 funds will be utilized to procure 200 CMBRE CE production kits. Prices range from 112K to 180K per kit and to finish Low-Rate Initial Production. Funds will also be utilized to procure and recapitalize the ATS Product Group which consists of: Armament and Stores ATS and Software Loader/Verifier and Built-in-Test ATS to include proven commercial and/or Government off-the-shelf ATS to replace legacy and obsolete systems to ensure persistent logistics and enable agile combat employment. Testers include Common Munitions BIT Reprogramming Equipment Plus (CMBRE), Common Munitions Built in Test Reprogramming Equipment Cyber Enhanced / Service Life Extension Program (CMBRE CE/ CMBRE SLEP), Cruise Missile Automatic Test Systems and any program management administration (PMA) or procurement efforts associated with this product group. Funds increased due to an average cost increase of 500K per Munitions Application Program (MAP) for established munitions and increases of up to 2M for more advanced/newer munitions. CMBRE system procurement costs have increased from originally estimated costs due to the inflated costs of CCA components, digital controller unit components, and assembly labor costs. Funds increased also due to the cost increases associated with the tech refresh on the Cruise Missile ATS program. Congressional Add funds received in FY24 for the Ebbing Field Beddown effort. Common Munitions BIT Reprogramming Equipment (CMBRE) Service Life Extension Program / has involved into the CMBRE Cyber Enhanced (SLEP/CE) test and is utilized to initiate BIT and reprogram MIL-STD-1760/Non-1760 smart bombs and missiles. Provides BIT status, upload/download and verification of applicable software including: Operational Flight Programs (OFPs), mission planning and/or Global Positioning System (GPS) crypto keys, preflight of smart munitions. The Cruise Missile - Automatic Test System is a nuclear certified tester designed to test the AGM-86 Cruise Missile fleet, the B-2 RLA, and associated Carrier Aircraft Equipment (CAE) used to launch missiles. LI 222000 - Replac Equip & War Consumables Air Force UNCLASSIFIED Page 3 of 4 P-1 Line #7 Volume 1 - 33 === page 64 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 P-1 Line Item Number / Title: 222000 / Replac Equip & War Consumables Aggregated Items Title: Replac Equip & War Consumables FY26-27 funds will be utilized to procure common automatic test/support equipment items, Program Management Administration (PMA), and other government associated costs in support of installation and unit mission requirements for Air Force personnel. CMBRE CE's production costs have increased from what was originally POM'd. Estimates from the Prototype Integration Facility (PIF) to complete production and slight increases in MAP procurement cost have caused FY26/27 numbers to increase. In direct support of SecWar's direction to increase readiness across the DoW, efforts within this PEC will be prioritized based on the National Defense Authorization Act (NDAA), USAF Force Design, Agile Combat Employment (ACE), and the Defense Planning Guide (DPG) These efforts will support work and collaboration efforts across the Combat Readiness Directorate in PE's 0708051F, 0701212F, 0702833F, 0604706F, 0605827F, 0202834F, 0502834F, 0502844F, 0208031F, 0401135F and 0207521F) -- to increase readiness across the Air Force Enterprise LI 222000 - Replac Equip & War Consumables Air Force UNCLASSIFIED Page 4 of 4 P-1 Line #7 Volume 1 - 34 === page 65 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: APKWS0 / Advanced Precision Kill Weapon System (APKWS) Missile Program Elements for Code B Items: 0207161F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - 1,000 - - - 750 750 750 750 - 4,000 Gross/Weapon System Cost ($ in Millions) - 0.000 85.428 0.000 - 0.000 30.000 29.999 29.969 30.552 - 205.948 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 0.000 85.428 0.000 - 0.000 30.000 29.999 29.969 30.552 - Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 0.000 85.428 0.000 - 0.000 30.000 29.999 29.969 30.552 - 205.948 205.948 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - 0.085 - - - 0.040 0.040 0.040 0.041 - 0.051 Description: The Advanced Precision Kill Weapon System II (APKWS II) with Fixed-Wing Air-Launched Counter Unmanned Aerial Systems (C-UAS) Ordnance (FALCO) software is employed on the A-10, F-15 and F-16 aircraft. The FALCO system is intended for air-to-air engagement of UAS; however, it remains effective in any terrain, including, but not limited to, urban, desert and mountainous. It provides an ability to engage and destroy moving and transient targets. FALCO offers greater precision, reduced collateral damage, and increased standoff range to enhance crew survivability. FALCO All-Up-Round (AUR) is composed of an proximity fuse, M151 warhead, a WGU-59 guidance and control section, and a MK66 rocket motor launched from a LAU-131A/A rocket launcher. These items are procured by AFLCMC/EBH through the U.S. Army Missile Command, Tactical Air to Ground Munitions (TAGM), PEO Missiles and Space at Redstone Arsenal Alabama, and/or the U.S. Navy PMA-242 at Patuxent River Naval Air Station. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. The FALCO guidance section is a mid-body, semi-active laser guidance and control kit that converts an unguided 2.75-inch rocket into a precision laser-guided rocket. The FALCO guidance sections are compatible with new and existing inventories of rocket motors, warheads, and launchers. The guidance sections are procured through Department of the Navy PMA-242 at Patuxent River Naval Air Station. Procurement quantities can change based on negotiated options/pricing bands and available funding, in accordance with Title 10, U.S Code Section 2308 BUY-TO-BUDGET ACQUISITION. Funds may be used to address production Diminishing Manufacturing Sources (DMS)/Material Shortages/Obsolescence issues through studies, bridge buys, life of type buys, supplier/parts re-placement, to include electronic components used commercially and in short supply, and qualification activities to preserve future production capabilities and capacities. These funds may also procure inventoried items which may not be procured on an annual basis and could be required on an emerging basis. Variations to cover critical shortfalls to inventory objectives as well as actual and planned expenditures will be addressed during execution year. Procurements for the execution year may vary due to changes in inventory objectives. Combatant commanders' requirements for Operational Plans influence these objectives, which are updated throughout the year. This program leverages Digital acquisition tenets of open, agile, and digital. Invests in analytical, information management, data management, digital environments, networks, facilities, and security infrastructure upgrades directly supporting development and sustainment of this program's capabilities, while leveraging the Department of War (DoW) and the Department of the Air Force (DAF) enterprise IT solutions. LI APKWS0 - Advanced Precision Kill Weapon System (A... Air Force UNCLASSIFIED Page 1 of 2 P-1 Line #8 Volume 1 - 35 === page 66 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: APKWS0 / Advanced Precision Kill Weapon System (APKWS) Missile Program Elements for Code B Items: 0207161F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A FY2025 funded in 3011 PE 0208030F. Justification: No FY 2027 funds are requested in the 3020 APKWS0 line. LI APKWS0 - Advanced Precision Kill Weapon System (A... Air Force UNCLASSIFIED Page 2 of 2 P-1 Line #8 Volume 1 - 36 === page 67 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: ARRW00 / AGM-183A Air-Launched Rapid Response Weapon Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - Procurement Quantity (Units in Each) - - Gross/Weapon System Cost ($ in Millions) - 0.000 Less PY Advance Procurement ($ in Millions) - - Net Procurement (P-1) ($ in Millions) - 0.000 Plus CY Advance Procurement ($ in Millions) - - Total Obligation Authority ($ in Millions) - 0.000 362.155 362.155 362.155 452.035 - - - 452.035 - - - 452.035 - 452.035 452.035 452.035 556.265 556.265 556.265 621.094 621.094 621.094 616.036 616.036 616.036 To FY 2031 Complete 596.636 596.636 596.636 Total - 3,204.221 - 3,204.221 - 3,204.221 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The Air-Launched Rapid Response Weapon (ARRW) provides an operational hypersonic, conventional prompt strike capability from stand-off ranges. It's a lethal capability against high-value time-sensitive targets in Anti-Access/Area-Denial (A2/AD) environments. Quantities will vary due to a buy-to-budget strategy and are Controlled Unclassified Information (CUI). ARRW procurement funding supports the entire weapon system to include resolution of obsolescence, end-of-life buys, bridge buys, supplier/parts replacement, to include electronic components used commercially and in short supply, and qualification activities to preserve and increase future production capabilities and capacity. Funding may be used to address Diminishing Manufacturing Sources (DMS) and obsolescence issues. Funding for this exhibit contained in PE 0101101F. The RDT&E activities of ARRW were developed in PE 0604033F. LI ARRW00 - AGM-183A Air-Launched Rapid Response Wea... Air Force UNCLASSIFIED Page 1 of 4 P-1 Line #9 Volume 1 - 37 === page 68 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: ARRW00 / AGM-183A Air-Launched Rapid Response Weapon Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 AGM-183A Air-Launched Rapid Response Weapon P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) A - / - - / 0.000 - / 362.155 - / 452.035 - / - - / 452.035 - / - - / 0.000 - / 362.155 - / 452.035 - / - - / 452.035 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funds will procure ARRW AGM-183A weapon systems and associated support costs. Quantities are Controlled Unclassified Information (CUI). Note: Procurement quantities can change based on negotiated options/pricing curve and available funding, in accordance with Title 10, U.S. Code Section 2308 Buy-To-Budget Acquisition. Buy-to-budget units will cause variations in the AUR unit costs. LI ARRW00 - AGM-183A Air-Launched Rapid Response Wea... Air Force UNCLASSIFIED Page 2 of 4 P-1 Line #9 Volume 1 - 38 === page 69 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: Item Number / Title [DODIC]: ARRW00 / AGM-183A Air-Launched Rapid Response Weapon AGM-183A Air-Launched Rapid Response Weapon Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 Procurement Quantity (Units in Each) - - Gross/Weapon System Cost ($ in Millions) - 0.000 Less PY Advance Procurement ($ in Millions) - - Net Procurement (P-1) ($ in Millions) - 0.000 Plus CY Advance Procurement ($ in Millions) - - Total Obligation Authority ($ in Millions) - 0.000 FY 2027 Base FY 2027 OOC - - 362.155 452.035 - 452.035 - 452.035 - - - 362.155 - - - 362.155 FY 2027 Total 452.035 - 452.035 - - 452.035 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Flyaway - AGM-183A Air-Launched Rapid Response Weapon Cost Recurring Cost ARRW AGM-183A - - - - - 0.000 - - 262.538 - - 351.684 - - - - - 351.684 Subtotal: Recurring Cost - - - - - 0.000 - - 262.538 - - 351.684 - - - - - 351.684 - - - - - 0.000 - - 262.538 - - 351.684 - - - - - 351.684 3.490 - - 20.773 - - - - - 20.773 Subtotal: Flyaway AGM-183A Air-Launched Rapid Response Weapon Cost Support - Air-launched Rapid Response Weapon (ARRW) Cost Program Management Administration (PMA) - - - - - 0.000 - - Test & Integration - - - - - 0.000 - - 0.000 - - 21.971 - - - - - 21.971 Reliability/DMS/Other - - - - - 0.000 - - 10.341 - - 27.344 - - - - - 27.344 Production Restart - - - - - 0.000 - - 55.604 - - 0.000 - - - - - 0.000 Engineering and Logistic support - - - - - 0.000 - - 30.182 - - 30.263 - - - - - 30.263 Subtotal: Support - Airlaunched Rapid Response Weapon (ARRW) Cost - - - - - 0.000 - - 99.617 - - 100.351 - - - - - 100.351 Gross/Weapon System Cost - - - - - 0.000 - - 362.155 - - 452.035 - - - - - 452.035 Remarks: Rapid Fielding MTA pre-decisional pending approval. LI ARRW00 - AGM-183A Air-Launched Rapid Response Wea... Air Force UNCLASSIFIED Page 3 of 4 P-1 Line #9 Volume 1 - 39 === page 70 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 P-1 Line Item Number / Title: Item Number / Title [DODIC]: ARRW00 / AGM-183A Air-Launched Rapid Response Weapon AGM-183A Air-Launched Rapid Response Weapon ID Code (A=Service Ready, B=Not Service Ready) : A MDAP/MAIS Code: Quantities will vary due to a buy-to-budget strategy and are Controlled Unclassified Information (CUI). In FY 2026, funding decreased $24.9 million from Congressional reduction: "Cost Excess to Need." Increase from FY2026 to FY2027 Test and Integration are planned for updates to configuration for affordability, obsolescence, diminishing manufacturing sources, etc., that may drive requirement for flights. Increase from FY2026 to FY2027 Program Management Administration (PMA) increase of contractor and other program support for facilitation and affordability to support increase quantities. Decrease from FY2026 to FY2027 Production restart is due to non-recurring production line start-up cost as a one time cost in FY2026 for lot 1. Increase from FY2026 to FY2027 Reliability/DMS/Other are planned for obsolescence, diminishing manufacturing sources, minor upgrades, and improvements incorporated to future lot buys. LI ARRW00 - AGM-183A Air-Launched Rapid Response Wea... Air Force UNCLASSIFIED Page 4 of 4 P-1 Line #9 Volume 1 - 40 === page 71 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: FAMM00 / Family of Affordable Mass Missile (FAMM) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 5,300 5,920 7,700 7,990 - 26,910 1,850.397 2,298.328 4,029.299 4,130.193 - 12,363.217 Procurement Quantity (Units in Each) - - - - - - Gross/Weapon System Cost ($ in Millions) - 0.000 0.000 55.000 - 55.000 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.000 0.000 55.000 - 55.000 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.000 0.000 55.000 - 55.000 1,850.397 1,850.397 2,298.328 2,298.328 4,029.299 4,029.299 To FY 2031 Complete 4,130.193 4,130.193 Total - 12,363.217 - 12,363.217 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - 0.349 0.388 0.523 0.517 - 0.459 Description: The Department of War is requesting FY 2027 Multiyear Procurement (MYP) authorization for the FAMM program. FAMM-P and FAMM-L programs will further develop Beyond Line-of-Sight capability for both weapon systems and integrate FAMM-L onto the F16 using three vendors (Zone 5 Technologies, CoAspire and Anduril Industries). Additionally, the FAMM program office will continue development activities for an affordable Extended Range capability with a range of over 1,000nm. The Air Force will continue FAMM-P and FAMM-L procurement, and is seeking a 7-year Multi-Year Production contract to stabilize the industrial base and maximize weapons production. The Adaptive Weapons program element (0604041F) modernizes the weapons acquisition process through the Modular Weapon Series (M-Series) paradigm using open and common hardware and software interface standards to increase acquisition agility, lower costs of weapon development and modification, and be rapidly upgradeable to respond to adversary actions. This program element will be utilized for additional classes of Adaptive Weapons as new Budget Program Activity Codes are incorporated into the PE. The first Adaptive Weapons class is the Family of Affordable Mass Missiles (FAMM) which provides a low-cost, standoff cruise missile designed to provide long range affordable mass to overwhelm enemy defenses and deplete adversary defensive weapons inventories, operating as a complement to more complex and more expensive weapons. The first variant of FAMM missiles is a palletized baseline configuration and will be followed by a lugged variant both with weapon-weapon communications. Future increments will be defined based upon user demand and are likely to include a Beyond Line-of-Sight (BLOS), Extended Range (ER), Long-Range Kill Chain (LRKC) communications, different payloads, sub-systems or employment options, etc. This program element will be utilized to further execute component level development for modular implementation into future increments of FAMM. In addition to procuring FAMM All-Up-Rounds (AUR), funds in this exhibit will be used for production tooling & equipment and addressing Diminishing Manufacturing Sources and Material Shortages (DMSMS) issues through studies, bridge buys, lifetime buys, and supplier/parts replacement. This requirement supports performance of a full financial audit as required by Title 10 U.S.C. Charter 9A, Sec 240D. Funding for this exhibit is contained in PE 0604041F. The FY 2027 request for FAMM includes $55,000 thousand of discretionary and $300,000 thousand of mandatory (Qty 1,000) for a total of $355,000 thousand (Qty 1,000). The mandatory funds for FAMM will be used to procure 1,000 All-Up-Rounds (AUR) of palletized and lugged FAMM weapon systems. The FY 2027 funds will continue efforts from FY 2026 to fund FAMM procurement of 1000 AURs. The $55,000 thousand in discretionary funds will be used for the Extended Range variant; funding details are available at a higher classification upon request. The FY 2026 spend plan amount for Missile Procurement includes $0 thousand of discretionary and $335,000 thousand (Qty 1,000) of mandatory (reconciliation) for a total of $335,000 thousand (Qty 1,000). LI FAMM00 - Family of Affordable Mass Missile (FAMM) Air Force UNCLASSIFIED Page 1 of 3 P-1 Line #10 Volume 1 - 41 === page 72 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: FAMM00 / Family of Affordable Mass Missile (FAMM) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Family of Affordable Mass Missile (FAMM) P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code A Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 0.000 - / 0.000 - / 55.000 - / - - / 55.000 - / - - / 0.000 - / 0.000 - / 55.000 - / - - / 55.000 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Details on FY 2027 discretionary funds will be provided at a higher classification level Note: Procurement quantities can change based on negotiated options/pricing bands and available funding, in accordance with Title 10, U.S. Code Section 3069 BUY-TO-BUDGET ACQUISITION. LI FAMM00 - Family of Affordable Mass Missile (FAMM) Air Force UNCLASSIFIED Page 2 of 3 P-1 Line #10 Volume 1 - 42 === page 73 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: FAMM00 / Family of Affordable Mass Missile (FAMM) Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Family of Affordable Mass Missile (FAMM) MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 0.000 0.000 55.000 - 55.000 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.000 0.000 55.000 - 55.000 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.000 0.000 55.000 - 55.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - FAMM Cost Recurring Cost FAMM-P - - - - - 0.000 - - 0.000 - - 55.000 - - - - - 55.000 FAMM-L - - - - - 0.000 - - 0.000 - - 0.000 - - - - - 0.000 Containers - - - - - 0.000 - - 0.000 - - 0.000 - - - - - 0.000 Pallets - - - - - 0.000 - - 0.000 - - 0.000 - - - - - 0.000 Subtotal: Recurring Cost - - - - - 0.000 - - 0.000 - - 55.000 - - - - - 55.000 Subtotal: Hardware - FAMM Cost - - - - - 0.000 - - 0.000 - - 55.000 - - - - - 55.000 Program Support Costs (PSC) - Other Government Costs - - - - - 0.000 - - 0.000 - - 0.000 - - - - - 0.000 Engineering Change Order (ECO)/ Obsolescence - - - - - 0.000 - - 0.000 - - 0.000 - - - - - 0.000 Subtotal: Support - FAMM Cost - - - - - 0.000 - - 0.000 - - 0.000 - - - - - 0.000 Gross/Weapon System Cost - - - - - 0.000 - - 0.000 - - 55.000 - - - - - 55.000 Support - FAMM Cost LI FAMM00 - Family of Affordable Mass Missile (FAMM) Air Force UNCLASSIFIED Page 3 of 3 P-1 Line #10 Volume 1 - 43 === page 74 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 44 === page 75 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: HACM00 / Hypersonic Attack Cruise Missile Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - Procurement Quantity (Units in Each) - - - Gross/Weapon System Cost ($ in Millions) - 0.000 0.000 Less PY Advance Procurement ($ in Millions) - - - Net Procurement (P-1) ($ in Millions) - 0.000 0.000 Plus CY Advance Procurement ($ in Millions) - - - Total Obligation Authority ($ in Millions) - 0.000 0.000 403.974 - - - 403.974 - - - 403.974 - 403.974 403.974 403.974 614.283 614.283 614.283 635.431 635.431 635.431 680.679 680.679 680.679 To FY 2031 Complete 693.929 693.929 693.929 Total - 3,028.296 - 3,028.296 - 3,028.296 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Hypersonic Attack Cruise Missile (HACM) is a Middle Tier Acquisition (MTA) Rapid Prototyping (RP) effort in (RDT&E) Program Element (PE) 0604183F, Project 644183. HACM is a hypersonic air-launched weapon that will enable the U.S. to hold fixed, high value, time-sensitive targets at risk in contested environments from standoff distances. Initial fielding and operational use of HACM will be on the F-15E aircraft. The RDT&E effort will design, develop, manufacture, and test production-ready missiles. US quantities will vary due to a buy to budget strategy and are Controlled Unclassified Information (CUI). HACM procurement funding supports the entire weapon system to include resolution of obsolescence, end-of-life buys, supplier/parts replacement, to include electronic components used commercially and in short supply, and qualification activities to preserve and increase future production capabilities and capacity. Funding may be used to address Diminishing Manufacturing Sources (DMS) and obsolescence issues. Funding for this exhibit contained in PE 0101101F. LI HACM00 - Hypersonic Attack Cruise Missile Air Force UNCLASSIFIED Page 1 of 3 P-1 Line #11 Volume 1 - 45 === page 76 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: HACM00 / Hypersonic Attack Cruise Missile Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Hypersonic Attack Cruise Missile P-40 Total Gross/Weapon System Cost Subexhibits ID CD A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 0.000 - / 0.000 - / 403.974 - / - - / 403.974 - / - - / 0.000 - / 0.000 - / 403.974 - / - - / 403.974 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: This program is a new start. FY 2027 funding will procure HACM AUR missiles, containers, and associated support equipment. Note: Procurement quantities can change based on negotiated options/pricing curve and available funding, in accordance with Title 10, U.S. Code Section 2308 Buy-To-Budget Acquisition. Buy-to-budget units will cause variations in the AUR unit costs. Unit costs are based on preliminary data. As the government and contractor update the system design to optimize for manufacturability, we anticipate decreasing unit costs in subsequent lots. LI HACM00 - Hypersonic Attack Cruise Missile Air Force UNCLASSIFIED Page 2 of 3 P-1 Line #11 Volume 1 - 46 === page 77 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: HACM00 / Hypersonic Attack Cruise Missile Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Hypersonic Attack Cruise Missile MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 Procurement Quantity (Units in Each) - - - Gross/Weapon System Cost ($ in Millions) - 0.000 0.000 Less PY Advance Procurement ($ in Millions) - - - Net Procurement (P-1) ($ in Millions) - 0.000 0.000 Plus CY Advance Procurement ($ in Millions) - - - Total Obligation Authority ($ in Millions) - 0.000 0.000 FY 2027 Base FY 2027 OOC - - 403.974 FY 2027 Total - - - 403.974 - 403.974 - - - 403.974 - 403.974 - - 403.974 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Flyaway - Hypersonic Attack Cruise Missile Cost Recurring Cost HACM Msl All-Up Round (AUR) - - - - - 0.000 - - 0.000 - - 365.928 - - - - - 365.928 Subtotal: Recurring Cost - - - - - 0.000 - - 0.000 - - 365.928 - - - - - 365.928 - - - - - 0.000 - - 0.000 - - 365.928 - - - - - 365.928 Subtotal: Flyaway Hypersonic Attack Cruise Missile Cost Support - Hypersonic Attack Cruise Missile Cost Product Support - - - - - 0.000 - - 0.000 - - 12.562 - - - - - 12.562 Program Management Administration (PMA) - - - - - 0.000 - - 0.000 - - 17.478 - - - - - 17.478 ECO/Affordability/DMS - - - - - 0.000 - - 0.000 - - 8.006 - - - - - 8.006 Subtotal: Support Hypersonic Attack Cruise Missile Cost - - - - - 0.000 - - 0.000 - - 38.046 - - - - - 38.046 Gross/Weapon System Cost - - - - - 0.000 - - 0.000 - - 403.974 - - - - - 403.974 Remarks: No procurement quantities in prior years. US quantities are not reflected due to classification of Controlled Unclassified Information (CUI). Additional details can be provided in a higher classification setting. Product Support Costs (PSC) include Contractor Services: Advisory and Assistance Services (A&AS) and Other Government Costs (OGC) for contract support. Program Management Administration (PMA) Costs include: Engineering, Professional, and Administrative Support Services (EPASS) Travel and Government Purchase Card (GPC). LI HACM00 - Hypersonic Attack Cruise Missile Air Force UNCLASSIFIED Page 3 of 3 P-1 Line #11 Volume 1 - 47 === page 78 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 48 === page 79 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: JASSM0 / Joint Air-Surface Standoff Missile Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 555 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 6,709 577 144 491 - 491 896 860 860 860 - 11,397 8,617.376 1,192.469 510.499 1,150.284 - 1,150.284 2,238.625 2,113.195 2,171.667 2,231.587 - 20,225.702 222.418 182.418 182.418 - 182.418 182.418 0.000 0.000 0.000 - 769.672 970.051 328.081 967.866 - 967.866 2,056.207 2,113.195 2,171.667 2,231.587 - 19,456.030 8,617.376 To FY 2031 Complete Total 769.672 0.000 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 - 769.672 9,387.048 970.051 328.081 967.866 - 967.866 2,056.207 2,113.195 2,171.667 2,231.587 - 20,225.702 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 3.493 0.491 0.495 0.506 - 0.506 0.517 0.527 0.536 0.547 - 7.112 Flyaway Unit Cost ($ in Millions) 1.086 1.707 2.967 2.165 - 2.165 2.394 2.344 2.413 2.481 - 1.591 Gross/Weapon System Unit Cost ($ in Millions) 1.284 2.067 3.545 2.343 - 2.343 2.498 2.457 2.525 2.595 - 1.775 Description: The Department of War is requesting FY 2027 Multiyear Procurement (MYP) authorization for the JASSM program. In the FY 2024 budget request, the Department initiated a Multiyear Procurement (MYP) strategy for AMRAAM; JASSM; LRASM; and STANDARD MISSILE-6, under the Large Lot Procurement (LLP) concept in which individual MYPs would be executed in a concurrent and overlapping multiyear strategy so that synergies in production across different but related programs can generate efficiencies and result in greater production capacity, accelerated delivery, and lower unit costs. LLP represents an evolution of the existing MYP contracting and financing strategy, that leverages the savings generated through the use of Economic Order Quantities (EOQ) financing to procure additional lots of missiles under a Buy-to-Budget concept, to further improve efficiencies and yields. The Joint Air-to-Surface Standoff Missile (JASSM) is an ACAT 1C program. This program provides a long range, conventional air-to-surface, autonomous, precision guided, standoff cruise missile compatible with fighter and bomber aircraft able to attack a variety of fixed or relocatable targets. The JASSM family of missiles includes JASSM Baseline (JASSM-BL/AGM-158A) and JASSM Extended Range (JASSM-ER/ AGM-158B, JASSM-ER/ AGM-158B-2, JASSM-ER/ AGM-158B-3, and JASSM-ER/ AGM-158D). The AGM-158A and AGM-158B are no longer in production. The AGM-158B-2 is currently in production in Lot 21. The AGM-158A, B, and B-2 are fielded. The AGM-158B-3 and D are in development. The variants in development will be gradually inserted into the production line as a new missile build once ready. Missiles accepted by the Air Force will not be returned for modification to the newest variant. The AGM-158B-2 replaces obsolete components and provides a new electronic fuze, a new Global Positioning System (GPS) receiver, an upgraded Missile Control Unit (MCU) Unit, and enhanced software. The AGM-158B-2 began low-rate initial production (LRIP) in Lot 19/FY 2021 funding year. The AGM-158B-2 is now in full rate production in Lot 21/ FY 2023. The AGM-158B-3 provides GPS M-Code capability and a terminal sensor. It begins LRIP in Lot 22/FY 2024 funding year. The AGM-158D provides Weapon Data Link (WDL) capability to re-target the missile, post-launch, against relocatable or higher priority targets during mission execution. AGM-158D was originally planned for a Lot 20/FY 2022 cut-in but was restructured to begin production in Lot 23/FY 2025 funding year to support joint interoperability requirements. Efforts also include, but are not limited to, production cut-in of alternate communication methods, architectures, and waveforms to advance missile capabilities against emerging threats. In prior years, FY 2024 Procurement fully funded Lot 22 as well as AGM-158B-3 Low-Rate Initial Production (LRIP), provided advanced procurement for Lot 23, and Economic Order Quantities for Lots 22-26 under the MYP strategy. FY 2025 Procurement funded Lot 23. FY 2026 Procurement funds Lot 24 in the third year of the MYP. FY 2027 Procurement will fund Lot 25 in the 4th year of the MYP. LI JASSM0 - Joint Air-Surface Standoff Missile Air Force UNCLASSIFIED Page 1 of 11 P-1 Line #12 Volume 1 - 49 === page 80 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: JASSM0 / Joint Air-Surface Standoff Missile Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 555 In addition to procuring JASSM All Up Rounds, funding may be used to address Diminishing Manufacturing Sources and Material Shortages (DMSMS) issues through studies, bridge buys, life of type buys, supplier/parts replacement) to include electronic components used commercially and in short supply and qualification and reliability activities to preserve future production capabilities and capacities. Threshold aircraft is the B-1 and the objective aircraft are the B-52, F-16, B-2, F-15E, and F-35A. Aircraft integration for JASSM-BL/AGM-158A and JASSM-ER/AGM-158B is complete on the B-52H, F-16 (Block 40-52), B-1, B-2, and F-15E. JASSM Lots 2-10 are covered under an Original Equipment Manufacture (OEM) warranty. Lots 11 and beyond are covered under a Contractor Logistics Support (CLS) contract, and missile initial/replenishment spares program funds are required to fill the spare parts pipeline under this program. Procurement quantities are estimates only and fall within a range of quantities based on negotiations for each specific lot contract. The FY 2027 request for Joint Air-to-Surface Standoff Missile (JASSM0) includes 967,866 thousand (Qty 491) of discretionary and 1,029,448 thousand (Qty 330) of mandatory (reconciliation) funding for a total of 1,997,314 thousand (Qty 821). The mandatory funds for the Joint Air-to-Surface Standoff Missile (JASSM0) will be used to procure and additional 330 All Up Rounds needed to reach JASSM's Annual Lot buy quantity. The FY 2027 mandatory funds continue efforts from FY 2026 to procure JASSM All Up Rounds at maximum capacity. The FY 2026 spend plan amount for Joint Air-to-Surface Standoff Missile (JASSM0) includes 328,081 thousand (Qty 144) of discretionary and 490,000 thousand (Qty 237) of mandatory (reconciliation) funding for a total of 818,081 thousand (Qty 381). This requirement supports performance of a full financial audit as required by Title 10 U.S.C. Chapter 9A, Sec 240-D. Funding for this exhibit contained in PE 0207325F LI JASSM0 - Joint Air-Surface Standoff Missile Air Force UNCLASSIFIED Page 2 of 11 P-1 Line #12 Volume 1 - 50 === page 81 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: JASSM0 / Joint Air-Surface Standoff Missile Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 555 Exhibits Schedule Exhibit Type Title* P-5 Joint Air-Surface Standoff Missile P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 6,709 / 8,617.376 577 / 1,192.469 144 / 510.499 491 / 1,150.284 - / - 491 / 1,150.284 6,709 / 8,617.376 577 / 1,192.469 144 / 510.499 491 / 1,150.284 - / - 491 / 1,150.284 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding (combined with the FY 2024 Advance Procurement amount $182.418 million supporting Lot 25) provides $1,150.284 million to procure 491 missiles. FY 2026 funding (combined with the FY 2024 Advance Procurement amount $182.418 million supporting Lot 24) provides $510.499 million to procure 144 missiles. FY 2025 funding (combined with the FY 2024 Advance Procurement amount $222.418 million supporting Lot 23) provides $1,192.469 million to procure 577 missiles. Full funding for every end item requesting advance procurement is included in the budget submission. Variant mix totals in all Fiscal Years are above Minimum Sustainment Rate. Note: Procurement quantities can change based on negotiated options/pricing bands and available funding, in accordance with Title 10, U.S. Code Section 3069 BUY-TO-BUDGET ACQUISITION. LI JASSM0 - Joint Air-Surface Standoff Missile Air Force UNCLASSIFIED Page 3 of 11 P-1 Line #12 Volume 1 - 51 === page 82 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: JASSM0 / Joint Air-Surface Standoff Missile Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Joint Air-Surface Standoff Missile MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2027 OOC FY 2027 Total 144 491 - 491 8,617.376 1,192.469 510.499 1,150.284 - 1,150.284 - 222.418 182.418 182.418 - 182.418 8,617.376 970.051 328.081 967.866 - 967.866 769.672 0.000 0.000 0.000 - 0.000 9,387.048 970.051 328.081 967.866 - 967.866 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base 577 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2026 6,709 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 3.493 0.491 0.495 0.506 - 0.506 Gross/Weapon System Unit Cost ($ in Millions) 1.284 2.067 3.545 2.343 - 2.343 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Flyaway - Flyaway End Item Cost Recurring Cost AGM-158B 1.099 2,650 2,913.227 - - - - - - - - - - - - - - - - - 126.094 - - 43.332 - - 53.148 - - 71.060 - - - - - 71.060 AGM-158B-2 1.311 1,847 2,422.049 1.481 219 324.380 - - - (†) 2.529 135 341.360 2.361 110 259.710 2.598 144 357.620 - - - - Engineering Change Orders/ Tooling/Equipment Maintenance/Repairs/ M&S Support AGM-158D (†) - - - - - - - - 1.898 362 687.010 - - - 1.898 362 687.010 - 2.365 129 305.060 - - - 2.365 129 305.060 - - - - - - - - 374.140 - 2.182 30 65.460 1.442 248 0.698 2,034 1,420.038 - - Subtotal: Recurring Cost - - 7,288.228 - - 985.042 - - 427.288 - - 1,063.130 - - - - - 1,063.130 Subtotal: Flyaway - Flyaway End Item Cost - - 7,288.228 - - 985.042 - - 427.288 - - 1,063.130 - - - - - 1,063.130 AGM-158B-3 AGM-158A - - - Support - Joint Air-Surface Standoff Missile Cost Program Support Costs (PSC) Contractor Services - - 79.166 - - 10.532 - - 7.621 - - 7.367 - - - - - 7.367 Program Support Costs (PSC) Other Government Costs - - 41.262 - - 2.400 - - 6.481 - - 6.428 - - - - - 6.428 Test Support/Reliability/ Obsolescence - - 763.491 - - 31.775 - - 55.651 - - 55.684 - - - - - 55.684 Prime Contractor Support - - 178.816 - - - - - 13.458 - - 17.675 - - - - - 17.675 LI JASSM0 - Joint Air-Surface Standoff Missile Air Force UNCLASSIFIED Page 4 of 11 P-1 Line #12 Volume 1 - 52 === page 83 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: JASSM0 / Joint Air-Surface Standoff Missile Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Joint Air-Surface Standoff Missile MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ M) Qty (Each) Unit Cost ($ M) Facilitization - - 216.887 - - New Factory/Ramp-up - - 49.526 - - Subtotal: Support - Joint AirSurface Standoff Missile Cost - - 1,329.148 - - 1.284 6,709 8,617.376 2.067 577 Gross/Weapon System Cost FY 2026 Total Cost ($ M) 162.720 FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) - - - - - - - - - - - - - - - - - - - - - - - - 207.427 - - 83.211 - - 87.154 - - - - - 87.154 1,192.469 3.545 144 510.499 2.343 491 1,150.284 - - - 2.343 491 1,150.284 - Remarks: JASSM (+ 9.816 million) larger increase from FY 2025 to FY 2026 Engineering Change Orders/Tooling/Maintenance and the (+ 17.912 million) increase from FY 2026 to FY 2027 is due to the cut-in of the AGM-158B-3 and AGM-158D. The increase in Prime Contractor Support from FY 2026 to FY 2027 is two-fold. First, it will support engineering and manufacturing practices to increase producibility, capability, and affordability for existing and future unit. Second, it will provide the funding necessary to support the acquisition of baseline and supplemental quantities sourced through Presidential Drawdown Authority tranche funds and will cover the higher hardware costs associated with a more expensive variant. The allocated funding for Test Support/Reliability/Obsolescence is projected to increase from FY 2025 through FY 2027 to accommodate Weapon System Evaluations, test instrumentation kits, and batteries. These totals include an increase in obsolescence associated with the production of the new AGM-158B-3 and AGM-158D variants, which add Weapon Data Link Radio, antenna, terminal sensor, and fuel tanks. As the overall weapon inventory increases, a corresponding and proportional cost increase in obsolescence cost is expected. Other Program Support includes funding for labor, travel, and support functions for mission related items, including cybersecurity support. (†) indicates the presence of a P-5a LI JASSM0 - Joint Air-Surface Standoff Missile Air Force UNCLASSIFIED Page 5 of 11 P-1 Line #12 Volume 1 - 53 === page 84 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements AGM-158D (†) AGM-158D (†) AGM-158D (†) AGM-158D (†) AGM-158B-3 (†) AGM-158B-3 (†) O O C P-1 Line Item Number / Title: JASSM0 / Joint Air-Surface Standoff Missile Item Number / Title [DODIC]: Joint Air-Surface Standoff Missile FY Contractor and Location Method/Type or Funding Vehicle 2024 Lockheed Martin / Troy, Alabama SS / FFP AFLCMC/PK Eglin AFB, FL Mar 2026 Mar 2029 135 2.306 Y Aug 2023 2025 Lockheed Martin / Troy, Alabama SS / FPIF AFLCMC/PK Eglin AFB, FL Mar 2025 Mar 2028 110 2.361 Y Aug 2023 2026 Lockheed Martin / Troy, Alabama SS / FPIF AFLCMC/PK Eglin AFB, FL Mar 2026 Mar 2029 144 2.598 Y Aug 2023 2027 Lockheed Martin / Troy, Alabama SS / FPIF AFLCMC/PK Eglin AFB, FL Mar 2027 Mar 2030 362 1.898 Y 2025 Lockheed Martin / Troy, Alabama SS / FPIF AFLCMC/PK Eglin AFB, FL Mar 2025 Mar 2028 248 1.442 Y 2027 Lockheed Martin / Troy, Alabama SS / FPIF AFLCMC/PK Eglin AFB, FL Mar 2027 Mar 2030 129 2.365 Y Location of PCO Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($ M) RFP Issue Date indicates the presence of a P-21 Remarks: The variants in development will be gradually inserted into the production line as a new missile build once ready. Missiles accepted by the Air Force will not be returned for modification to the newest variant. The Lot 22 Undefinitized Contract Action (UCA) was awarded in Sept 2024 and was later definitized in Jul 2025. A contract modification to change 40 of the AGM-158B-2 missiles to AGM-158B-3s is projected in FY 2026. A contract modification to change 10 of the AGM-158B-3 missiles to AGM-158D is projected in FY 2026. FY 2024 Ukraine Presidential Drawdown Authority, Tranche 25, and JASSM UKR WPN plus up funds includes 238 B-2 Lot 22. It also funds 135 Ds in Lot 24. The Lot 23 is part of Large Lot Procurement (LLP). Includes 219 AGM-158B-2s, 248 AGM-158B-3s, and 110 AGM-158Ds. The Lot 24 is part of LLP. Includes 144 AGM-158Ds. The Lot 25 is part of LLP. Includes 129 AGM-158 B-3s and 362 AGM-158Ds. LMMFC is the only contractor able to fulfill the Government's requirements listed in the J&A as cited below in this section. The original business strategy for the JASSM Baseline program included a full and open competition with two (2) contracts awarded to McDonnell Douglas (now The Boeing Company) and Lockheed Martin Integrated Systems (now Lockheed Martin Missile and Fire Control (LMMFC)). During a rolling down-select in the PDRR phase, the Program Office conducted a down select to one (1) contractor (winner take all) for completion of development and production of an estimated 2,400 JASSM Baseline units. In April 1998, the Government selected Lockheed Martin as the best value offer to be the JASSM Baseline prime contractor. The competitive acquisition plan included any upgrades to the JASSM Baseline system, such as the extended range capability. It would cost the USG at least $4.96 billion to attain the level of production currently realized in the present day by JASSM and its variants. Based on Government estimates, if the remaining JASSM requirements including all future quantities were re-competed, the nearly $5 billion investment would not be recovered. Accordingly, LMMFC is the only firm capable of providing the supplies and services described in the Justification and Approval for other than Full and Open Competition document, Section Ill without DoW and FMS customers experiencing substantial duplication of cost that are not expected to be recovered through competition. LI JASSM0 - Joint Air-Surface Standoff Missile Air Force UNCLASSIFIED Page 6 of 11 P-1 Line #12 Volume 1 - 54 === page 85 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: JASSM0 / Joint Air-Surface Standoff Missile Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Joint Air-Surface Standoff Missile Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P AGM-158D 1 2025 AF 110 0 110 1 2026 AF 144 0 144 1 2027 AF 362 0 362 A - - - - - - - - - - - - - - - - - - - 110 A - - - - - - - 144 362 AGM-158B-3 Prior Years Deliveries: 30 2 2025 AF 248 0 248 2 2027 AF 129 0 129 A - - - - - - - - - - - - - - - - - - - 248 129 O C T N O V LI JASSM0 - Joint Air-Surface Standoff Missile Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #12 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 55 === page 86 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: JASSM0 / Joint Air-Surface Standoff Missile Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Joint Air-Surface Standoff Missile Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P AGM-158D 1 2025 AF 110 0 110 - - - - - - - - - - - - - - - - - 10 10 10 10 10 10 1 2026 AF 144 0 144 - - - - - - - - - - - - - - - - - - - - - - - - 9 144 41 1 2027 AF 362 0 362 A - - - - - - - - - - - - - - - - - - - 362 - - - - - - - - - - - - 21 21 21 21 21 21 21 101 A - - - - - - - - - - - - - - - - - - - 129 AGM-158B-3 Prior Years Deliveries: 30 2 2025 AF 248 0 248 2 2027 AF 129 0 129 O C T N O V LI JASSM0 - Joint Air-Surface Standoff Missile Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #12 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 56 === page 87 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: JASSM0 / Joint Air-Surface Standoff Missile Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Joint Air-Surface Standoff Missile Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P AGM-158D 1 2025 AF 110 69 41 1 2026 AF 144 0 144 - 9 - 8 - 8 - 8 - 8 12 12 12 12 12 12 12 12 12 12 12 12 0 1 2027 AF 362 0 362 - - - - - - - - - - - - - - - - - 32 33 33 33 33 33 33 132 - - - - - - - - - - - - 10 10 10 11 11 11 11 55 0 AGM-158B-3 Prior Years Deliveries: 30 2 2025 AF 248 147 101 21 20 20 20 20 2 2027 AF 129 0 129 - - - - - O C T N O V LI JASSM0 - Joint Air-Surface Standoff Missile Air Force D E C J A N F E B 0 M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #12 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 57 === page 88 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: JASSM0 / Joint Air-Surface Standoff Missile Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Joint Air-Surface Standoff Missile Fiscal Year 2031 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2030 1 OCT Fiscal Year 2032 Calendar Year 2031 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2032 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E AGM-158D 1 2025 AF 110 110 0 1 2026 AF 144 144 0 1 2027 AF 362 230 132 0 0 33 33 33 33 11 11 11 11 0 AGM-158B-3 Prior Years Deliveries: 30 2 2025 AF 248 248 0 2 2027 AF 129 74 55 0 O C T N O V LI JASSM0 - Joint Air-Surface Standoff Missile Air Force D E C J A N 11 F E B 0 M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #12 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 58 === page 89 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: JASSM0 / Joint Air-Surface Standoff Missile Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: Joint Air-Surface Standoff Missile Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Lockheed Martin - Troy, Alabama 143 143 860 0 0 0 0 1 6 36 42 2 Lockheed Martin - Troy, Alabama 143 143 860 0 0 0 0 1 6 36 42 Remarks: Minimum Sustained Rate (MSR) increased due to new operational production facility. LRASM and JASSM missiles are procured on the same LLP contract. LRASM and JASSM missiles currently share the same assembly line and are procured on the same contract. JASSM MSR is 286 in Facility P72 and 50 in Facility P14, which leaves a LRASM capacity of 60 in Facility P14 for a total of 396 for FY 2027. Each shift is 1-10-4 in both buildings. Reference LRASM0 PE Line item 0207325F document, page 10 of 14, Exhibit P-21. Variant mix quantity totals in all fiscal years are above MSR. LRASM AGM-158C-3 JASSM AGM-158B-3 and AGM-158D "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI JASSM0 - Joint Air-Surface Standoff Missile Air Force UNCLASSIFIED Page 11 of 11 P-1 Line #12 Volume 1 - 59 === page 90 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 60 === page 91 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical P-1 Line Item Number / Title: JATM00 / Joint Advanced Tactical Missile Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - Procurement Quantity (Units in Each) - - Gross/Weapon System Cost ($ in Millions) - 0.000 Less PY Advance Procurement ($ in Millions) - - Net Procurement (P-1) ($ in Millions) - 0.000 Plus CY Advance Procurement ($ in Millions) - - Total Obligation Authority ($ in Millions) - 0.000 368.593 368.593 368.593 608.743 608.743 608.743 - 608.743 608.743 608.743 1,605.628 1,605.628 1,605.628 2,013.178 2,013.178 2,013.178 To FY 2031 Complete 1,858.467 1,858.467 1,858.467 1,838.553 1,838.553 1,838.553 - Total 8,293.162 8,293.162 8,293.162 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The details of this budget justification are classified, per Executive Order 13526, Sec 1.4 (a) and are submitted annually to Congress in the classified budget justification book. Funding for this exhibit contained in PE 0207172F. Air Force is the Lead Service for this Joint Program with the Navy. Justification: The details of this budget justification are classified, per Executive Order 13526, Sec 1.4 (a) and are submitted annually to Congress in the classified budget justification book. LI JATM00 - Joint Advanced Tactical Missile Air Force UNCLASSIFIED Page 1 of 1 P-1 Line #13 Volume 1 - 61 === page 92 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 62 === page 93 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: JSM000 / Joint Strike Missile Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 102 40 - 100 - 100 41 - - - - 333.511 150.909 384.607 - 384.607 179.563 0.000 0.000 0.000 0.000 333.511 333.511 150.909 150.909 0.000 0.000 0.000 - - 384.607 - - 384.607 - 384.607 384.607 179.563 179.563 To FY 2031 Complete - - - - 0.000 0.000 0.000 0.000 - - - - 0.000 0.000 0.000 0.000 Total 283 1,048.590 1,048.590 1,048.590 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) 2.802 3.278 - 3.408 - 3.408 3.531 - - - - 3.189 Gross/Weapon System Unit Cost ($ in Millions) 3.270 3.773 - 3.846 - 3.846 4.380 - - - - 3.705 Description: Joint Strike Missile (JSM) is a near-term solution for long range precision strike capability against maritime surface and land targets in highly contested environments. JSM provides long-range standoff for platform survivability, performance in GPS denied environments, survivability against advanced threat systems, and internal carriage in F-35A weapons bay. Initial fielding and operational use will be on the F-35A. Integration on other platforms may occur during this time-frame as directed by ACC. Norwegian defense contractor, Kongsberg Defense & Aerospace (KDA), has completed development of JSM. Royal Norwegian Air Force (RNoAF) funded F-35A test and integration is ongoing and is required to support delta integration for USAF JSM on the F-35A. USAF will leverage the RNoAF test and integration efforts to gain confidence of JSM performance on F-35A and improve timeline for fielding. Additionally, USAF will perform additional tests needed for USAF fielding that include service specific test and integration, regression, and qualification activities as well as cyber security compliance. The JSM procurement funding supports the entire weapon system to include resolution of obsolescence, end-of-life buys, bridge buys, test assets, simulators, COMSEC components, GPS receivers, supplier/ parts replacement, to include electronic components used commercially and in short supply, and qualification activities to preserve and increase future production capabilities and capacity. Procurement funding also supports engineering and technical support needed to produce, test, modify and field the JSM and support mission planning activities. Funding may be used to perform the USAF specific test and integration, regression, and qualification activities. Funding may also be used to address Diminishing Manufacturing Sources (DMS) issues and cyber security compliance requirements. USAF JSM Operational Test and Evaluation (OT&E) is projected to begin Oct 2027 (subject to completion of F-35 JPO/RNoAF JSM Development Test and Evaluation (DT&E) - currently projected for Dec 2026). No items are being replaced. Comparative info (e.g., range, speed) is TBD: will be assessed throughout F-35 JPO/RNoAF DT&E effort; once available, key performance characteristics are expected to be classified. USAF JSM effort heavily leverages ongoing F-35 JPO/RNoAF JSM DT&E effort. FY27 budget request includes the Tactical Network (Tacnet) Radio and retrofit effort. This requirement supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Funding for this exhibit is contained in PE 0207335F. LI JSM000 - Joint Strike Missile Air Force UNCLASSIFIED Page 1 of 10 P-1 Line #14 Volume 1 - 63 === page 94 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: JSM000 / Joint Strike Missile Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Joint Strike Missile P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 102 / 333.511 40 / 150.909 - / 0.000 100 / 384.607 - / - 100 / 384.607 102 / 333.511 40 / 150.909 - / 0.000 100 / 384.607 - / - 100 / 384.607 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 budget request includes funding for JSM All Up Rounds (AURs), weapon containers, under the Lot 4 contract with KDA, TacNet radio, retrofit & program support. FY 2027 budget request will procure up to 100 AURs The FY 2026 spend plan amount for JSM includes $0 thousand of discretionary and $377,000 thousand of mandatory (reconciliation) for a total of $377,000 thousand. Note: Procurement quantities can change based on negotiated options/pricing bands and available funding, in accordance with Title 10, U.S Code Section 2308 BUY-TO-BUDGET ACQUISITION. LI JSM000 - Joint Strike Missile Air Force UNCLASSIFIED Page 2 of 10 P-1 Line #14 Volume 1 - 64 === page 95 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: JSM000 / Joint Strike Missile Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Joint Strike Missile MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) FY 2025 FY 2026 102 40 333.511 150.909 - Net Procurement (P-1) ($ in Millions) 100 384.607 - 384.607 - 384.607 - 150.909 - - - 0.000 FY 2027 Total - - 0.000 - 333.511 FY 2027 OOC 100 - 150.909 - Total Obligation Authority ($ in Millions) 0.000 - 333.511 Plus CY Advance Procurement ($ in Millions) FY 2027 Base - 384.607 - 384.607 - - 384.607 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) - - - - - - 3.270 3.773 - 3.846 - 3.846 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Flyaway - Joint Strike Missile Cost Recurring Cost JSM Msl All Up Round (†) (AUR) 2.782 102 283.765 3.231 40 129.250 - - 0.000 3.257 100 325.700 - - - 3.257 100 325.700 - - 283.765 - - 129.250 - - 0.000 - - 325.700 - - - - - 325.700 - - 283.765 - - 129.250 - - 0.000 - - 325.700 - - - - - 325.700 Subtotal: Recurring Cost Subtotal: Flyaway - Joint Strike Missile Cost Flyaway - Ancillary Equipment Cost Cost Non Recurring Cost Containers - - 2.056 - - 1.869 - - 0.000 - - 6.540 - - - - - 6.540 Tacnet Radio Retrofit - - - - - 0.000 - - - - - 8.588 - - - - - 8.588 Subtotal: Non Recurring Cost - - 2.056 - - 1.869 - - 0.000 - - 15.128 - - - - - 15.128 Subtotal: Flyaway - Ancillary Equipment Cost Cost - - 2.056 - - 1.869 - - 0.000 - - 15.128 - - - - - 15.128 PSC Other Government Costs - - 4.689 - - 5.343 - - 0.000 - - 8.562 - - - - - 8.562 PSC Contractor Services - - 1.176 - - 2.215 - - 0.000 - - 3.403 - - - - - 3.403 Loading Cradle - - 0.324 - - 0.532 - - 0.000 - - 0.000 - - - - - 0.000 Test and Integration - - 32.492 - - 1.975 - - 0.000 - - 15.704 - - - - - 15.704 Cybersecurity - - 0.400 - - 1.987 - - 0.000 - - 0.325 - - - - - 0.325 Engineering & Technical Support - - 8.609 - - 7.738 - - 0.000 - - 9.953 - - - - - 9.953 Support - Support End Item Cost Cost LI JSM000 - Joint Strike Missile Air Force UNCLASSIFIED Page 3 of 10 P-1 Line #14 Volume 1 - 65 === page 96 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: JSM000 / Joint Strike Missile Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Joint Strike Missile MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Interim Contract Support (ICS) - - - - - - - - - - - 5.832 - - - - - 5.832 Subtotal: Support - Support End Item Cost Cost - - 47.690 - - 19.790 - - 0.000 - - 43.779 - - - - - 43.779 Gross/Weapon System Cost 3.270 102 333.511 3.773 40 150.909 - - 0.000 3.846 100 384.607 - - - 3.846 100 384.607 Remarks: Note: JSM quantities are estimated and were based on program office estimates only. The actual quantities the USAF can procure will be based upon the negotiated prices. JSM will utilize buy to budget authority and negotiation efficiencies to obtain the maximum quantity in each FY PSC Other Government Costs: Travel and Government Purchase Card (GPC). PSC Contractor Services: Advisory and Assistance Services (A&AS) and Other Government Costs (OGC) for contract support. 2025-2027 increases: 1)Containers; FY2025 was a lower number due to most containers being bought with FY2024 2)PSC Other Gov't Costs; FY2025 to FY2027 increase in mission support bills mirrors budget increase 3)Test & Integration Costs; additional testing in FY2027 in comparison to FY2025 NOTE: FY2024 actual 111 (Lot 1 64 + Lot 2 47) FY2025 actual 33 (Lot 2) (†) indicates the presence of a P-5a LI JSM000 - Joint Strike Missile Air Force UNCLASSIFIED Page 4 of 10 P-1 Line #14 Volume 1 - 66 === page 97 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 O O C Cost Elements (†) JSM Msl All Up Round (AUR) (†) JSM Msl All Up Round (AUR) (†) JSM Msl All Up Round (AUR) (†) P-1 Line Item Number / Title: JSM000 / Joint Strike Missile Item Number / Title [DODIC]: Joint Strike Missile FY Contractor and Location Method/Type or Funding Vehicle 2024 KDA / Kongsberg, Norway SS / UCA AFLCMC/PK Eglin AFB, FL May 2024 Jun 2026 102 3.113 Y Dec 2023 2025 KDA / Kongsberg, Norway TBD AFLCMC/PK Eglin AFB, FL Nov 2025 Dec 2027 40 3.231 Y Dec 2023 2027 KDA / Kongsberg, Norway TBD AFLCMC/PK Eglin AFB, FL May 2027 Feb 2030 100 3.257 Y Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date indicates the presence of a P-21 LI JSM000 - Joint Strike Missile Air Force UNCLASSIFIED Page 5 of 10 P-1 Line #14 Volume 1 - 67 === page 98 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: JSM000 / Joint Strike Missile Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Joint Strike Missile Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P JSM Msl All Up Round (AUR) 1 2024 AF 102 0 102 1 2025 AF 40 0 40 A - 40 1 2027 AF 100 0 100 100 O C T LI JSM000 - Joint Strike Missile Air Force N O V D E C J A N F E B M A R A P R M A Y - J U N - J U L - A U G UNCLASSIFIED Page 6 of 10 - S E P - O C T - N O V - D E C - J A N - F E B P-1 Line #14 - M A R - A P R - M A Y - J U N - J U L - A U G - 102 S E P Volume 1 - 68 === page 99 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: JSM000 / Joint Strike Missile Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Joint Strike Missile Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P JSM Msl All Up Round (AUR) 1 2024 AF 102 0 102 1 2025 AF 40 0 40 1 2027 AF 100 0 100 - - - - - - - - - - - - - 8 8 - 8 - 8 - 8 - 8 - 9 - 9 - 9 - 9 - 9 - 9 - 0 - - A O C T LI JSM000 - Joint Strike Missile Air Force A N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #14 M A R A P R M A Y - J U N - J U L A U G - 40 - 100 S E P Volume 1 - 69 === page 100 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: JSM000 / Joint Strike Missile Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Joint Strike Missile Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P JSM Msl All Up Round (AUR) 1 2024 AF 102 102 0 1 2025 AF 40 0 40 - - 0 1 2027 AF 100 0 100 - - O C T LI JSM000 - Joint Strike Missile Air Force N O V 3 3 D E C 3 J A N 3 F E B 3 M A R 3 A P R 3 M A Y 3 J U N 4 J U L A U G UNCLASSIFIED Page 8 of 10 4 4 S E P 4 O C T 0 N O V D E C J A N F E B P-1 Line #14 M A R A P R M A Y J U N J U L A U G - 100 S E P Volume 1 - 70 === page 101 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: JSM000 / Joint Strike Missile Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Joint Strike Missile Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E JSM Msl All Up Round (AUR) 1 2024 AF 102 102 0 1 2025 AF 40 40 0 1 2027 AF 100 0 100 0 0 O C T LI JSM000 - Joint Strike Missile Air Force N O V D E C J A N 8 F E B 8 M A R 8 A P R 8 M A Y 8 J U N 8 J U L 8 A U G UNCLASSIFIED Page 9 of 10 8 S E P 9 O C T 9 N O V 9 D E C 9 J A N 0 F E B P-1 Line #14 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 71 === page 102 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: JSM000 / Joint Strike Missile Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Item Number / Title [DODIC]: Joint Strike Missile Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 50 50 100 1 KDA - Kongsberg, Norway ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 1 Manufacturing PLT 8 Total After Oct 1 33 41 Remarks: Actuals and Buy-to-Budget Profile: Lot 1 Awarded May 2025: 64 AURs, all FY2024$, delivery Jun 26 to May 27 Lot 2 Awarded Dec 2025: 80 AURs, 47 AURs w/FY2024$ and 33 AURs w/FY2025$ = Total 80 AURs, delivery Dec 27 to Nov 28 Lot 3 Planned Award May 2026: 100 AURs FY2025$ RECON, delivery Feb 30 - Jan 31 Note FY2026$ was distributed in FY2025$ RECON funds (25/29 life) Lot 4 Planned Award May 2027: 100 AURs FY2027$, delivery Feb 30 - Jan 31 Lot 5 Planned Award May 2028: 41 AURs FY2028$, delivery Mar 31 - Feb 32 Note: Procurement quantities can change based on negotiated options/pricing bands and available funding, in accordance with Title 10, U.S Code Section 2308 BUY-TO-BUDGET ACQUISITION. In the delivery schedule an "A" indicates either an Authority to Proceed event or the definitized Contract Award Date. Production rates and procurement lead times are estimated; better insight will be obtained after contract award. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI JSM000 - Joint Strike Missile Air Force UNCLASSIFIED Page 10 of 10 P-1 Line #14 Volume 1 - 72 === page 103 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: LRASM0 / LRASM0 Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 449 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 245 172 93 111 - 111 156 152 152 145 833.969 589.076 319.369 525.884 - 525.884 774.121 775.188 786.371 751.022 0.000 833.969 To FY 2031 Complete Total - 1,226 5,355.000 24.967 24.968 24.968 - 24.968 24.968 0.000 0.000 0.000 0.000 99.871 564.109 294.401 500.916 - 500.916 749.153 775.188 786.371 751.022 0.000 5,255.129 Plus CY Advance Procurement ($ in Millions) 99.871 0.000 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 0.000 99.871 Total Obligation Authority ($ in Millions) 933.840 564.109 294.401 500.916 - 500.916 749.153 775.188 786.371 751.022 0.000 5,355.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Flyaway Unit Cost ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) 0.524 0.526 0.520 0.520 - 0.520 0.531 0.541 0.550 0.561 - - - - - - - - - - - - 4.273 - 3.404 3.425 3.434 4.738 - 4.738 4.962 5.100 5.173 5.179 - 4.368 Description: The Department of War is requesting FY 2027 Multiyear Procurement (MYP) authorization for the LRASM program. In the FY 2024 budget request, the Department initiated a Multiyear Procurement (MYP) strategy for AMRAAM; JASSM; LRASM; and STANDARD MISSILE-6, under the Large Lot Procurement (LLP) concept in which individual MYPs would be executed in a concurrent and overlapping multiyear strategy so that synergies in production across different but related programs can generate efficiencies and result in greater production capacity, accelerated delivery, and lower unit costs. LLP represents an evolution of the existing MYP contracting and financing strategy, that leverages the savings generated through the use of Economic Order Quantities (EOQ) financing to procure additional lots of missiles under a Buy-to-Budget concept, to further improve efficiencies and yields. The Long-Range Anti-Ship Missile (LRASM) is an ACAT 1C program and increment 1 of the Offensive Anti-Surface Warfare (OASuW) weapon development program. LRASM (AGM-158C) addresses an airlaunch capability gap by providing flexible, long-range, advanced, anti-surface capability against high-threat maritime targets. LRASM achieved Early Operational Capability (EOC) in December 2018 on the United States Air Force (USAF) B-1 Lancer and EOC on the United States (USN) F/A-18E/F Super Hornet in November 2019. The USN is the lead service for the LRASM program. LRASM is highly leveraged on the design of the Joint Air-to-Surface Standoff Missile-Extended Range (JASSM-ER). LRASM and JASSM-ER have over 70% hardware commonality and share the same production assembly line. The USAF and USN jointly procure LRASMs via a USAF contract that benefits from cost savings when aligned with JASSM-ER procurements. LRASM All Up Round (AUR) unit cost and quantities in this Program Element (PE) are dependent on USN LRASM PE 0204167N and USAF JASSM PE 0207325F. FY 2027 aligns the third year of MYP and LRASM Lot 11. The USAF will procure the LRASM (AGM-158C-3), a baseline-derived capability to enhance long-range strike and existing OASuW capability. The LRASM C-3 will be an Engineering Change Proposal (ECP) to the LRASM baseline program. The milestone target for LRASM C-3 EOC on the USN F/A-18E/F is planned for the 4th quarter of FY 2026 while USAF C-3 integration on the B-1B and F-15E/EX is planned by 4th quarter FY 2029. In addition to procuring LRASM All Up Rounds, funds in this exhibit will be used for production tooling & equipment and to address Diminishing Manufacturing Sources and Material Shortages (DMSMS) issues through studies, bridge buys, lifetime buys, and supplier/parts replacement. This requirement supports performance of a full financial audit as required by Title 10 U.S.C. Charter 9A, Sec 240D. The FY 2026 spend plan amount for the Long-Range Anti-Ship Missile (LRASM) includes 294,401 thousand (Qty 93) of discretionary and 112,000 thousand (Qty 21) of mandatory (reconciliation) funding for a total of 406,401 thousand (Qty 114). LI LRASM0 - LRASM0 Air Force UNCLASSIFIED Page 1 of 11 P-1 Line #15 Volume 1 - 73 === page 104 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: LRASM0 / LRASM0 Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 449 The FY 2027 request for the Long-Range Anti-Ship Missile (LRASM0) includes 500,916 thousand (Qty 111) of discretionary and 236,389 thousand (Qty 45) of mandatory funding for a total of 737,305 thousand (Qty 156). The mandatory funds for the Long-Range Anti-Ship Missile (LRASM0) will be used to procure an additional 45 All Up Rounds needed to reach LRASM's Annual Lot buy quantity. The FY 2027 mandatory funds continue efforts from FY 2026 to procure LRASM AURs at maximum capacity. Funding for this exhibit is contained in PE 0207325F. LI LRASM0 - LRASM0 Air Force UNCLASSIFIED Page 2 of 11 P-1 Line #15 Volume 1 - 74 === page 105 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: LRASM0 / LRASM0 Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 449 Exhibits Schedule Exhibit Type Title* P-5 LRASM0 P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 245 / 833.969 172 / 589.076 93 / 319.369 111 / 525.884 - / - 111 / 525.884 245 / 833.969 172 / 589.076 93 / 319.369 111 / 525.884 - / - 111 / 525.884 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding (combined with the FY 2024 Advance Procurement amount $24.968 million supporting Lot 11) provides $525.884 million to procure 111 missiles. FY 2026 funding (combined with the FY 2024 Advance Procurement amount $24.968 million supporting Lot 10) provides $319.369 million to procure 93 missiles. FY 2025 funding (combined with the FY 2024 Advance Procurement amount $24.968 million supporting Lot 9) provides $589.076 million to procure 172 missiles. Note: Procurement quantities can change based on negotiated options/pricing bands and available funding, in accordance with Title 10, U.S. Code Section 3069 BUY-TO-BUDGET ACQUISITION. (advanced Procurement funding). LI LRASM0 - LRASM0 Air Force UNCLASSIFIED Page 3 of 11 P-1 Line #15 Volume 1 - 75 === page 106 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: LRASM0 / LRASM0 Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: LRASM0 MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) FY 2025 FY 2027 Base FY 2027 OOC FY 2027 Total 172 93 111 - 111 833.969 589.076 319.369 525.884 - 525.884 - Net Procurement (P-1) ($ in Millions) FY 2026 245 833.969 24.967 24.968 24.968 - 24.968 564.109 294.401 500.916 - 500.916 Plus CY Advance Procurement ($ in Millions) 99.871 0.000 0.000 0.000 - 0.000 Total Obligation Authority ($ in Millions) 933.840 564.109 294.401 500.916 - 500.916 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 0.524 0.526 0.520 0.520 - 0.520 Gross/Weapon System Unit Cost ($ in Millions) 3.404 3.425 3.434 4.738 - 4.738 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - LRASM Cost Recurring Cost AGM-158C Tooling/Production NRE 3.260 217 707.391 3.034 151 458.077 3.089 83 256.387 - - - - - - - - - - - 5.815 - - 14.275 - - 11.937 - - 15.207 - - - - - 15.207 4.186 28 117.220 5.400 21 113.400 4.124 10 41.240 4.493 111 498.723 - - - 4.493 111 498.723 - - 830.426 - - 585.752 - - 309.564 - - 513.930 - - - - - 513.930 - - 830.426 - - 585.752 - - 309.564 - - 513.930 - - - - - 513.930 Program Support Costs (PSC) Other Government Costs - - 1.907 - - 1.885 - - 7.177 - - 9.120 - - - - - 9.120 Engineering Change Order (ECO)/ Obsolescence - - 1.636 - - 1.439 - - 2.628 - - 2.834 - - - - - 2.834 Subtotal: Support - LRASM Cost - - 3.543 - - 3.324 - - 9.805 - - 11.954 - - - - - 11.954 Gross/Weapon System Cost 3.404 245 833.969 3.425 172 589.076 3.434 93 319.369 4.738 111 525.884 - - - 4.738 111 525.884 (†) AGM-158C-3 Subtotal: Recurring Cost Subtotal: Hardware LRASM Cost Support - LRASM Cost Remarks: The tooling increase starting in FY 2025 compared to prior years is due to the addition of the AGM-158C-3 variant; it also accounts for the increased hardware cost to support a more expensive variant. LI LRASM0 - LRASM0 Air Force UNCLASSIFIED Page 4 of 11 P-1 Line #15 Volume 1 - 76 === page 107 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 P-1 Line Item Number / Title: LRASM0 / LRASM0 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: LRASM0 MDAP/MAIS Code: The increase in Program Support Costs (PSC) from FY 2025 to FY 2027 is to fund additional manpower and program support infrastructure required to support the Air Force ramp of AGM-158C and AGM-158C-3 quantities. The increase in Engineering Change Order (ECO)/Obsolescence from FY 2025 to FY 2027 is to fund increased obsolescence cases for both AGM-158C and AGM-158C-3 to include lifetime buys (LTBs), redesigns, and qualifications. (†) indicates the presence of a P-5a LI LRASM0 - LRASM0 Air Force UNCLASSIFIED Page 5 of 11 P-1 Line #15 Volume 1 - 77 === page 108 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 FY Contractor and Location (†) 2024 Lockheed Martin / Troy, AL SS / FFP Eglin AFB Mar 2025 Jul 2028 28 4.186 Y Jan 2021 (†) 2025 Lockheed Martin / Troy, AL SS / FPIF Eglin AFB Mar 2025 Jul 2027 21 5.400 Y Aug 2023 (†) 2026 Lockheed Martin / Troy, AL SS / FPIF Eglin AFB Mar 2026 Jul 2028 10 4.124 Y Aug 2023 (†) 2027 Lockheed Martin / Troy, AL SS / FPIF Eglin AFB Mar 2027 Jul 2029 111 4.493 Y Aug 2023 AGM-158C-3 AGM-158C-3 AGM-158C-3 AGM-158C-3 (†) Item Number / Title [DODIC]: LRASM0 Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: LRASM0 / LRASM0 Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date indicates the presence of a P-21 Remarks: Lot 8 (FY 2024) procured 90 AGM-158Cs for the USAF. FY 2024 funds will also procure 28 AGM-158C-3 for Lot 10 (FY 2026). Lot 9 (FY 2025) is part of the Large Lot Procurement (LLP) Program. Includes 151 AGM-158Cs and 21 AGM-158C-3s. Lot 10 (FY 2026) is part of LLP. Includes 83 AGM-158Cs and 10 AGM-158C-3s. Lot 11 (FY 2027) is part of LLP. Includes 111 AGM-158C-3s. LI LRASM0 - LRASM0 Air Force UNCLASSIFIED Page 6 of 11 P-1 Line #15 Volume 1 - 78 === page 109 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: LRASM0 / LRASM0 Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: LRASM0 Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P AGM-158C-3 1 2024 AF 1 2024 NAVY 28 0 28 A - - - - - - - - - - - - - - - - - - - 28 10 0 10 A - - - - - - - - - - - - - - - - - - - 1 2024 10 Total 38 0 38 - - - - - - - - - - - - - - - - - - - 1 38 2025 AF 21 0 21 A - - - - - - - - - - - - - - - - - - - 21 1 2025 NAVY 30 0 30 A - - - - - - - - - - - - - - - - - - - 30 1 2025 Total 51 0 51 - - - - - - - - - - - - - - - - - - - 51 1 2026 AF 10 0 10 A - - - - - - - 10 1 2026 NAVY 108 0 108 A - - - - - - - 108 1 2026 Total 118 0 118 - - - - - - - 1 2027 AF 111 0 111 111 1 2027 NAVY 117 0 117 117 1 2027 Total 228 0 228 (‡) (‡) (‡) (‡) 228 O C T LI LRASM0 - LRASM0 Air Force 118 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #15 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 79 === page 110 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: LRASM0 / LRASM0 Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: LRASM0 Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P AGM-158C-3 1 2024 AF 1 2024 NAVY 28 0 28 - - - - - - - - - - - - - 10 0 10 - - - - - 1 - 1 1 1 2 2 2 - - - - - - - - 1 2024 Total 38 0 38 - - - - - 1 - 1 1 1 2 2 2 - - - - - - - - 1 2025 AF 21 0 21 - - - - - - - - - 1 1 1 2 1 2025 NAVY 30 0 30 - - - - - - - - - 1 2025 Total 51 0 51 - - - - - - - - - 1 2026 AF 10 0 10 - - - - - - - - - - - - - - - - - - - - - 1 2026 NAVY 108 0 108 - - - - - - - - - - - - - - - - - - - - - 1 2026 Total 118 0 118 - - - - - - - - - - - - - - - - - - - - - 1 2027 AF 111 0 111 A - - - - - - - - - - - - - - - - - - - 111 1 2027 NAVY 117 0 117 A - - - - - - - - - - - - - - - - - - - 117 1 2027 Total 228 0 228 - - - - - - - - - - - - - - - - - - - 228 (‡) (‡) (‡) (‡) O C T LI LRASM0 - LRASM0 Air Force N O V D E C J A N F E B - M A R - A P R - M A Y - J U N - - - - 1 J U L 1 A U G UNCLASSIFIED Page 8 of 11 - 1 S E P 2 - 2 O C T 2 - 2 N O V 2 - 2 D E C 2 - 2 J A N 2 2 2 F E B P-1 Line #15 2 M A R 2 A P R 2 M A Y 2 J U N 9 - 9 2 2 9 - 9 0 0 10 0 - - - 0 - - - 30 - 1 1 - 1 A U G 30 1 1 J U L 10 - 7 108 1 115 S E P Volume 1 - 80 === page 111 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: LRASM0 / LRASM0 Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: LRASM0 Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P AGM-158C-3 1 2024 AF 1 2024 NAVY 28 28 0 10 10 0 1 2024 Total 38 38 0 - - - - - - - - - - - - - - - 1 2025 AF 21 21 0 - - - - - - - - - - - - - - - 1 2025 NAVY 30 0 30 - - - - - - - - - 5 5 5 5 5 5 1 2025 Total 51 21 30 - - - - - - - - - 5 5 5 5 5 5 1 2026 AF 10 3 7 - - 1 2026 NAVY 108 0 108 - - 1 2026 Total 118 3 115 - - 1 2027 AF 111 0 111 - - - - - - - - - 1 2027 NAVY 117 0 117 - - - - - - - - - 1 2027 Total 228 0 228 (‡) (‡) (‡) (‡) 0 0 O C T LI LRASM0 - LRASM0 Air Force 1 - 1 A P R 1 1 M A R 1 1 F E B 1 1 J A N 1 1 D E C 1 1 N O V 1 1 M A Y - - - - - - - - 0 0 0 - - - - - - - - - 0 - - - - - - - - - - - - - - - 0 - - - - - - - - - - - - 12 12 12 72 - - - 12 12 12 72 10 10 10 - - - 0 - - - - - - 117 - 117 - 9 9 - J U N - 9 J U L 9 A U G 9 9 J A N 9 9 D E C 9 9 N O V 9 9 O C T 9 9 S E P 9 - UNCLASSIFIED Page 9 of 11 9 9 F E B P-1 Line #15 9 M A R 10 A P R 10 M A Y 10 J U N J U L A U G S E P Volume 1 - 81 === page 112 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: LRASM0 / LRASM0 Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: LRASM0 Fiscal Year 2031 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2030 1 OCT Calendar Year 2031 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2032 M A Y J U N J U L Calendar Year 2032 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P AGM-158C-3 1 2024 AF 1 2024 NAVY 28 28 0 10 10 0 1 2024 Total 38 38 0 1 2025 AF 21 21 0 1 2025 NAVY 30 30 0 1 2025 Total 51 51 0 - - - - - - - 1 2026 AF 10 10 0 - - - - - - - 1 2026 NAVY 108 36 72 12 10 10 10 10 10 10 1 2026 Total 118 46 72 12 10 10 10 10 10 10 - - - - - - - - - - - - - - 1 2027 AF 111 111 0 - - - - - - - - - - - - - - - - - - - - - 1 2027 NAVY 117 0 117 - - - - - - - - - 10 10 10 10 10 9 9 9 10 10 10 10 1 2027 Total 228 111 117 - - - - - - - - - 10 10 10 10 10 9 9 9 10 10 10 10 (‡) (‡) (‡) (‡) 0 0 - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 O C T LI LRASM0 - LRASM0 Air Force - N O V D E C J A N F E B M A R A P R - - - - - - - - - - - - - - - - - 0 0 0 M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #15 M A R A P R M A Y J U N - - - 0 0 0 J U L A U G S E P Volume 1 - 82 0 === page 113 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: LRASM0 / LRASM0 Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Item Number / Title [DODIC]: LRASM0 Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Lockheed Martin - Troy, AL MSR For 2027 1-8-5 For 2027 MAX For 2027 60 110 320 ALT Prior to Oct 1 ALT After Oct 1 1 Reorder Manufacturing PLT 6 28 Total After Oct 1 ALT Prior to Oct 1 34 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 Remarks: LRASM and JASSM missiles share the same assembly line and are procured on the same Large Lot Procurement (LLP) contract. Total available for LRASM capacity is split 50/50 between the USAF and USN. The AGM-158C variant quantities may fluctuate between the Services but will not exceed the 320 quantity profile. LRASM AUR assembly is exclusively performed in building P14 of Lockheed Martin Pike County, AL facility. The LRASM Minimum Sustainment Rate (MSR) is 60 units. This production rate is predicated on the utilization of a 1-10-4 shift schedule and the concurrent manufacturing of at least 50 Joint Air-to-Surface Standoff Missiles (JASSM) within the same period. The LRASM production capacity is shared 50/50 between USN and USAF. Reference JASSM0 PE 0207325F, page 10 of 14, Exhibit P-21. (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI LRASM0 - LRASM0 Air Force UNCLASSIFIED Page 11 of 11 P-1 Line #15 Volume 1 - 83 0 === page 114 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 84 === page 115 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: M09HAI / Sidewinder (AIM-9X) Program Elements for Code B Items: N/A Other Related Program Elements: 0207161F Line Item MDAP/MAIS Code: 442 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 4,455 579 173 648 - 648 447 215 228 210 189 7,144 1,793.738 306.159 100.352 419.238 - 419.238 283.144 135.441 134.099 136.709 128.296 3,437.176 1,793.738 1,793.738 306.159 306.159 100.352 100.352 - - 419.238 - - 419.238 - 419.238 283.144 419.238 283.144 135.441 135.441 134.099 - To FY 2031 Complete 136.709 - Total 128.296 3,437.176 - - 134.099 136.709 128.296 3,437.176 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 40.226 2.079 2.090 2.125 - 2.125 2.169 2.212 2.255 2.300 4.890 60.346 Flyaway Unit Cost ($ in Millions) 0.355 0.505 0.486 0.622 - 0.622 0.596 0.551 0.512 0.567 0.584 0.433 Gross/Weapon System Unit Cost ($ in Millions) 0.403 0.529 0.580 0.647 - 0.647 0.633 0.630 0.588 0.651 0.679 0.481 Description: The AIM-9X Block II/II+ Sidewinder (AIM-9X Blk II/II+) continues the evolution of the AIM-9 series of missiles. This missile program delivers a launch and leave, air combat munition that uses passive Infrared (IR) energy to acquire and track enemy air targets and complements the radar guided Advanced Medium Range Air-to-Air Missile (AMRAAM). The inner-boundry missile provides first shot, first kill opportunities while conducting air combat maneuvering which is essential for aircrew survival. The AIM-9X provides these opportunities with unmatched offensive and defensive capabilities against threats within the inner boundary, even when IR countermeasures are employed. The AIM-9X also provides air superiority in the Beyond Visual Range (BVR) air-to-air battle. Anti-tamper features have been incorporated to protect improvements inherent in this design. The AIM-9X Block II missile is critical for projecting power and winning decisively against current and emerging threats. AIM-9X is a Post Milestone C, Acquisition Category IC (ACAT-IC) joint service program led by the Department of the Navy (DoN). In June 2011, the Milestone Decision Authority (MDA) established the AIM-9X Block II missile program which was approved for entry at Milestone C for Low Rate Initial Production (LRIP). The Block I program ended with the Sec 2366 A/B certification and Acquisition Program Baseline (APB) for AIM-9X Block II approval on December 23, 2011. In August 2015, the program received approval for Full Rate Production (FRP), and the APB was re-established. In December 2017, the program began to procure a third variant of the missile labeled the AIM-9X Block II PLUS (Block II+) to satisfy the requirements of the Joint Strike Fighter platform. This version of the missile is being produced on the same production line as the AIM-9X Block II missile. For contracting purposes, the nomenclature of the AIM-9X Block II missile is identified as AIM-9X-2 or AIM-9X-4 and the AIM-9X Block II+ missile is identified as AIM-9X-3. The AIM-9X-4 variants are the System Improvement Program (SIP) III configuration with upgraded hardware for obsolescence that cut into Lot 21. In February 2019, the APB for DoN and USAF was revised to increase total missile procurements from 6,000 to 11,635 missiles and to extend USAF missile procurements through 2035. The current APB quantity of 11,635 missiles is made up of 5,326 DoN missiles and 6,309 USAF missiles. Funding for this exhibit contained in PE 0207161F. Funding may be used to address Diminishing Manufacturing Source (DMS) issues. This requirement supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Differences in USAF and USN All-Up Rounds (AUR) unit cost is the result of the variations in procurement of missile types by each service. LI M09HAI - Sidewinder (AIM-9X) Air Force UNCLASSIFIED Page 1 of 16 P-1 Line #16 Volume 1 - 85 === page 116 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: M09HAI / Sidewinder (AIM-9X) Program Elements for Code B Items: N/A Other Related Program Elements: 0207161F Line Item MDAP/MAIS Code: 442 Exhibits Schedule Exhibit Type Subexhibits ID CD P-5a, P-21 A Title* P-5 Sidewinder (AIM-9X) P-40 Total Gross/Weapon System Cost MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 4,455 / 1,793.738 579 / 306.159 173 / 100.352 648 / 419.238 - / - 648 / 419.238 4,455 / 1,793.738 579 / 306.159 173 / 100.352 648 / 419.238 - / - 648 / 419.238 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 provides funding to procure the thirteenth lot of FRP AIM-9X Block II (Blk II) missiles for the Air Force. The program unit costs are based on quantities procured by the DoN, USAF, and Army, as well as Foreign Military Sales (FMS) customers. Total Program quantity by service includes a mix of AUR missiles and Captive Air Training Missiles (CATM). In FY 2027, the Air Force will procure 809 missiles. Specifically, 791 AURs and 18 CATMs. Following budget database lock, SAF received an updated FY2027 Unit Cost projection of $474 thousand which is expected to result in a revised FY2027 Procurement Qty of 809. Funding may be used to resolve production Diminishing Manufacturing Sources (DMS)/Material Shortages/Obsolescence issues through studies, bridge buys, life of type buys, supplier/parts replacement and qualification activities to preserve future production capabilities and capacities. Note: Procurement quantities can change based on negotiated options/pricing bands and available funding, in accordance with Title 10, U.S Code Section 3069 BUY-TO-BUDGET ACQUISITION. Tranche funding received via FY 2025 reprogramming actions: • Ukraine Tranche 28: 81.7M for Lot 25 AURs (177 AUR) • Israel Tranches 3 & 4: 23.0M for Lot 25 AURs (50 AUR) • Israel Tranches 6: 4.668M for Lot 26 AURs (10 AUR) LI M09HAI - Sidewinder (AIM-9X) Air Force UNCLASSIFIED Page 2 of 16 P-1 Line #16 Volume 1 - 86 === page 117 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: M09HAI / Sidewinder (AIM-9X) Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Sidewinder (AIM-9X) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2026 FY 2027 Total 173 648 - 648 1,793.738 306.159 100.352 419.238 - 419.238 - - 1,793.738 Plus CY Advance Procurement ($ in Millions) - 306.159 - Total Obligation Authority ($ in Millions) FY 2027 OOC 579 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2027 Base 4,455 - 1,793.738 - 100.352 - 306.159 - 419.238 - 100.352 - - 419.238 - - 419.238 - 419.238 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 40.226 2.079 2.090 2.125 - 2.125 Gross/Weapon System Unit Cost ($ in Millions) 0.403 0.529 0.580 0.647 - 0.647 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Flyaway - Flyaway End Item Cost Recurring Cost All Up Round - Block (†) 0.376 3,271 1,229.896 0.469 559 262.171 0.447 144 64.379 0.474 791 374.974 - - - 0.474 791 374.974 Captive Air Training Missile (CATM) - Block II 0.225 944 212.400 0.238 59 14.042 0.261 24 6.260 0.246 18 4.428 - - - 0.246 18 4.428 Engineering Change Orders - Block II - - 2.038 - - 0.000 - - 1.839 - - 7.760 - - - - - 7.760 Diminishing Manufacturing Sources - - 48.667 - - 11.248 - - 10.830 - - 12.395 - - - - - 12.395 Government Cost (GFE & Testing) Block II - - 1.191 - - 0.110 - - 0.038 - - 0.052 - - - - - 0.052 Special Test/Special Tooling Equipment Block II - - 13.943 - - 0.000 - - 0.000 - - 0.000 - - - - - 0.000 Missile Containers Block II 0.018 1,137 20.466 0.017 146 2.482 0.015 42 0.647 0.016 203 3.336 - - - 0.016 203 3.336 Non-Recurring Engineering - Block II - - 53.817 - - 2.054 - - 0.000 - - 0.000 - - - - - 0.000 All Up Round - Block II Plus - - - - - 0.000 - - 0.000 - - 0.000 - - - - - 0.000 All Up Round - Block II - No GU - - - - - 0.000 - - 0.000 - - 0.000 - - - - - 0.000 II LI M09HAI - Sidewinder (AIM-9X) Air Force UNCLASSIFIED Page 3 of 16 P-1 Line #16 Volume 1 - 87 === page 118 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: M09HAI / Sidewinder (AIM-9X) Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Sidewinder (AIM-9X) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Subtotal: Recurring Cost - - 1,582.418 - - 292.107 - - 83.993 - - 402.945 - - - - - 402.945 Subtotal: Flyaway - Flyaway End Item Cost - - 1,582.418 - - 292.107 - - 83.993 - - 402.945 - - - - - 402.945 Production Tech Support - - 109.316 - - 6.432 - - 8.656 - - 9.059 - - - - - 9.059 Peculiar Support Equipment - Block II - - 1.243 - - 0.000 - - 0.055 - - 0.176 - - - - - 0.176 Test Equipment - Block II - - 16.340 - - 0.000 - - 0.000 - - 0.000 - - - - - 0.000 Program Support Costs (PSC) Contractor Services - Block II - - 14.199 - - 1.395 - - 0.669 - - 0.890 - - - - - 0.890 PSC Other Government Costs - Block II - - 69.175 - - 6.025 - - 6.928 - - 6.116 - - - - - 6.116 Training Support - Block II - - 1.047 - - 0.200 - - 0.051 - - 0.052 - - - - - 0.052 Subtotal: Support - Support End Item Cost - - 211.320 - - 14.052 - - 16.359 - - 16.293 - - - - - 16.293 Gross/Weapon System Cost 0.403 4,455 1,793.738 0.529 579 306.159 0.580 173 100.352 0.647 648 419.238 - - - 0.647 648 419.238 Support - Support End Item Cost Remarks: The program is in production and any changes that will occur, prior to or after fielding, are software changes. Hardware specs are available and being used to manufacture the missile. Baseline software specs are known. In FY 2027, the Air Force will procure 809 missiles. Specifically, 791 AURs and 18 CATMs. (†) indicates the presence of a P-5a LI M09HAI - Sidewinder (AIM-9X) Air Force UNCLASSIFIED Page 4 of 16 P-1 Line #16 Volume 1 - 88 === page 119 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements O O C (†) All Up Round - Block II (†) All Up Round - Block II (†) All Up Round - Block II (†) All Up Round - Block II (†) All Up Round - Block II (†) All Up Round - Block II (†) All Up Round - Block II (†) P-1 Line Item Number / Title: M09HAI / Sidewinder (AIM-9X) Method/Type or Funding Vehicle Item Number / Title [DODIC]: Sidewinder (AIM-9X) Location of PCO Award Date Date of First Delivery Qty Specs Date Unit Cost Avail Revision Now? Available ($ M) RFP Issue Date FY Contractor and Location 2021 Raytheon Missile Systems / Tucson, AZ SS / FPIF NAVAIR Jun 2021 Aug 2023 214 0.377 Y Jan 2020 2022 Raytheon Missile Systems / Tucson, AZ SS / FPIF NAVAIR Mar 2022 Aug 2024 148 0.436 Y Jan 2021 2023 Raytheon Missile Systems / Tucson, AZ SS / FPIF NAVAIR Jun 2023 Aug 2025 448 0.404 Y Jan 2022 2024 Raytheon Missile Systems / Tucson, AZ SS / FPIF NAVAIR Sep 2024 Aug 2026 256 0.467 Y Jan 2023 2025 Raytheon Missile Systems / Tucson, AZ SS / FPIF NAVAIR Jun 2025 Aug 2027 559 0.469 Y Jan 2024 2026 Raytheon Missile Systems / Tucson, AZ SS / FPIF NAVAIR May 2026 Aug 2028 144 0.447 Y Jan 2025 2027 Raytheon Missile Systems / Tucson, AZ SS / FPIF NAVAIR Jun 2027 Aug 2029 791 0.474 Y Jun 2026 (Each) indicates the presence of a P-21 LI M09HAI - Sidewinder (AIM-9X) Air Force UNCLASSIFIED Page 5 of 16 P-1 Line #16 Volume 1 - 89 === page 120 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: M09HAI / Sidewinder (AIM-9X) Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Sidewinder (AIM-9X) Fiscal Year 2021 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT Calendar Year 2021 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2022 M A Y J U N J U L Calendar Year 2022 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P All Up Round - Block II Prior Years Deliveries: 2205 1 2021 1 2021 AF (1) FMS (‡) (2) (‡) (3) 214 0 214 A - - - - - - - - - - - - - - - - 214 84 0 84 A - - - - - - - - - - - - - - - - 84 1 2021 NAVY 217 0 217 A - - - - - - - - - - - - - - - - 217 1 2021 Total 515 0 515 - - - - - - - - - - - - - - - - 515 1 2022 AF (4) 148 0 148 A - - - - - - - 148 104 0 104 A - - - - - - - 104 157 0 157 A - - - - - - - 157 1 2022 1 2022 ARMY (‡) (5) FMS (‡) (6) (‡) (7) 1 2022 NAVY 1 2022 Total 1 2023 AF 1 2023 ARMY 1 2023 FMS (‡) 1 2023 NAVY 1 2023 Total 1 2024 AF 1 2024 ARMY 1 2024 FMS (‡) 1 2024 NAVY 1 2024 Total 1 2025 AF 1 2025 ARMY 1 2025 FMS (‡) 1 2025 NAVY 1 2025 Total 1 2026 AF 1 2026 ARMY (‡) (‡) (‡) (‡) (‡) (‡) (‡) 85 0 85 A - - - - - - - 85 494 0 494 - - - - - - - 494 448 0 448 448 12 0 12 12 118 0 118 118 84 0 84 84 662 0 662 662 256 0 256 256 34 0 34 34 577 0 577 577 94 0 94 94 961 0 961 961 559 0 559 559 288 0 288 288 907 0 907 907 116 0 116 116 1,870 0 1,870 1,870 144 0 144 144 76 0 76 76 O C T LI M09HAI - Sidewinder (AIM-9X) Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #16 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 90 === page 121 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: M09HAI / Sidewinder (AIM-9X) Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1 2026 FMS 1 2026 NAVY 1 2026 Total 1 2027 AF 1 2027 ARMY 1 2027 FMS 1 2027 NAVY 1 2027 Total (‡) (‡) (‡) (‡) (‡) PROC QTY Item Number / Title [DODIC]: Sidewinder (AIM-9X) Fiscal Year 2021 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT Fiscal Year 2022 Calendar Year 2021 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2022 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 634 0 634 96 0 96 634 96 950 0 950 950 791 0 791 791 476 0 476 476 358 0 358 358 277 0 277 277 1,902 0 1,902 1,902 O C T LI M09HAI - Sidewinder (AIM-9X) Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #16 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 91 === page 122 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: M09HAI / Sidewinder (AIM-9X) Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Sidewinder (AIM-9X) Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P All Up Round - Block II Prior Years Deliveries: 2205 1 2021 1 2021 AF (1) FMS (‡) (2) (‡) (3) 214 0 214 - - - - - - - - - - 178 - - - - - - - - - - - - - 36 84 0 84 - - - - - - - - - - 70 - - - - - - - - - - - - - 14 38 1 2021 NAVY 217 0 217 - - - - - - - - - - 179 - - - - - - - - - - - - - 1 2021 Total 515 0 515 - - - - - - - - - - 427 - - - - - - - - - - - - - 88 1 2022 AF (4) 148 0 148 - - - - - - - - - - - - - - - - - - - - - - 32 - 116 1 2022 104 0 104 - - - - - - - - - - - - - - - - - - - - - - 18 - 86 1 2022 157 0 157 - - - - - - - - - - - - - - - - - - - - - - 27 - 130 ARMY (‡) (5) FMS (‡) (6) (‡) (7) 1 2022 NAVY 1 2022 Total 1 2023 AF 1 2023 ARMY 1 2023 FMS (‡) 1 2023 NAVY 1 2023 Total 1 2024 AF 1 2024 ARMY 1 2024 FMS (‡) 1 2024 NAVY 1 2024 Total 1 2025 AF 1 2025 ARMY 1 2025 FMS (‡) 1 2025 NAVY 1 2025 Total 1 2026 AF 1 2026 ARMY (‡) (‡) (‡) (‡) (‡) (‡) (‡) 85 0 85 - - - - - - - - - - - - - - - - - - - - - - 15 - 70 494 0 494 - - - - - - - - - - - - - - - - - - - - - - 92 - 402 448 0 448 A - - - - - - - - - - - - - - - - 448 12 0 12 A - - - - - - - - - - - - - - - - 12 118 0 118 A - - - - - - - - - - - - - - - - 118 84 0 84 A - - - - - - - - - - - - - - - - 84 662 0 662 - - - - - - - - - - - - - - - - 662 256 0 256 A - 256 34 0 34 A - 34 577 0 577 A - 577 94 0 94 A - 94 961 0 961 - 961 559 0 559 559 288 0 288 288 907 0 907 907 116 0 116 116 1,870 0 1,870 1,870 144 0 144 144 76 0 76 76 O C T LI M09HAI - Sidewinder (AIM-9X) Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #16 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 92 === page 123 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: M09HAI / Sidewinder (AIM-9X) Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1 2026 FMS 1 2026 NAVY 1 2026 Total 1 2027 AF 1 2027 ARMY 1 2027 FMS 1 2027 NAVY 1 2027 Total (‡) (‡) (‡) (‡) (‡) PROC QTY Item Number / Title [DODIC]: Sidewinder (AIM-9X) Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Fiscal Year 2024 Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 634 0 634 96 0 96 634 96 950 0 950 950 791 0 791 791 476 0 476 476 358 0 358 358 277 0 277 277 1,902 0 1,902 1,902 O C T LI M09HAI - Sidewinder (AIM-9X) Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #16 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 93 === page 124 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: M09HAI / Sidewinder (AIM-9X) Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Sidewinder (AIM-9X) Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P All Up Round - Block II Prior Years Deliveries: 2205 1 2021 1 2021 AF (1) FMS (‡) (2) (‡) (3) 214 178 36 36 0 84 70 14 14 0 1 2021 NAVY 217 179 38 38 1 2021 Total 515 427 88 88 - - - - - - - - - 1 2022 AF (4) 148 32 116 12 12 12 12 12 12 11 11 11 11 0 104 18 86 9 9 9 9 9 9 8 8 8 8 0 157 27 130 13 13 13 13 13 13 13 13 13 13 0 1 2022 1 2022 ARMY (‡) (5) FMS (‡) (6) (‡) (7) 0 - - - - - - - - - - - - - - 0 1 2022 NAVY 85 15 70 7 7 7 7 7 7 7 7 7 7 1 2022 Total 494 92 402 41 41 41 41 41 41 39 39 39 39 - - - - - - - - - - - - - 1 2023 AF 448 0 448 - - - - - - - - - - 35 35 35 35 35 35 35 35 35 34 34 34 31 0 1 2023 ARMY 12 0 12 - - - - - - - - - - 1 1 1 1 1 1 1 1 1 1 1 1 - 0 1 2023 FMS (‡) 118 0 118 - - - - - - - - - - 10 10 10 10 10 10 10 10 10 10 9 9 - 0 1 2023 NAVY 84 0 84 - - - - - - - - - - 7 7 7 7 7 7 7 7 7 7 7 7 - 1 2023 Total 662 0 662 - - - - - - - - - - 53 53 53 53 53 53 53 53 53 52 51 51 31 - 0 1 2024 AF 256 0 256 - - - - - - - - - - - - - - - - - - - - - - 21 22 213 1 2024 ARMY 34 0 34 - - - - - - - - - - - - - - - - - - - - - - 3 3 28 1 2024 FMS (‡) 577 0 577 - - - - - - - - - - - - - - - - - - - - - - 49 48 480 1 2024 NAVY 94 0 94 - - - - - - - - - - - - - - - - - - - - - - - 1 93 1 2024 Total 961 0 961 - - - - - - - - - - - - - - - - - - - - - - 73 74 814 1 2025 AF 559 0 559 A - - - - - - - - - - - - - - - - 559 1 2025 ARMY 288 0 288 A - - - - - - - - - - - - - - - - 288 1 2025 FMS (‡) 907 0 907 A - - - - - - - - - - - - - - - - 907 1 2025 NAVY 116 0 116 A - - - - - - - - - - - - - - - - 116 1 2025 Total 1,870 0 1,870 - - - - - - - - - - - - - - - - 1,870 1 2026 AF 144 0 144 A - - - - - 144 1 2026 76 0 76 A - - - - - 76 ARMY (‡) (‡) (‡) (‡) (‡) (‡) (‡) O C T LI M09HAI - Sidewinder (AIM-9X) Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L 0 A U G UNCLASSIFIED Page 10 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #16 M A R A P R M A Y J U N J U L A U G - 0 0 S E P Volume 1 - 94 === page 125 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: M09HAI / Sidewinder (AIM-9X) Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1 2026 FMS 1 2026 NAVY 1 2026 Total 1 2027 AF 1 2027 ARMY 1 2027 FMS 1 2027 NAVY 1 2027 Total (‡) (‡) (‡) (‡) (‡) PROC QTY Item Number / Title [DODIC]: Sidewinder (AIM-9X) Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 634 0 634 A - - - - - 96 0 96 A - - - - - 96 950 0 950 - - - - - 950 791 0 791 791 476 0 476 476 358 0 358 358 277 0 277 277 1,902 0 1,902 1,902 O C T LI M09HAI - Sidewinder (AIM-9X) Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #16 M A R A P R M A Y J U N J U L A U G 634 S E P Volume 1 - 95 === page 126 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: M09HAI / Sidewinder (AIM-9X) Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Sidewinder (AIM-9X) Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P All Up Round - Block II Prior Years Deliveries: 2205 1 2021 1 2021 AF (1) FMS (‡) (2) (‡) (3) 214 214 0 0 84 84 0 0 1 2021 NAVY 217 217 0 1 2021 Total 515 515 0 1 2022 AF (4) 148 148 0 0 104 104 0 0 157 157 0 0 1 2022 1 2022 ARMY (‡) (5) FMS (‡) (6) (‡) (7) 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 1 2022 NAVY 85 85 0 1 2022 Total 494 494 0 1 2023 AF 448 448 0 0 1 2023 ARMY 12 12 0 0 1 2023 FMS (‡) 118 118 0 0 1 2023 NAVY 84 84 0 1 2023 Total 662 662 0 - - - - - - - - - - - 1 2024 AF 256 43 213 22 22 22 22 21 21 21 21 21 20 - 0 1 2024 ARMY 34 6 28 3 3 3 3 3 3 3 3 2 2 - 0 1 2024 FMS (‡) 577 97 480 48 48 48 48 48 48 48 48 48 48 - 1 2024 NAVY 94 1 93 9 9 9 9 9 8 8 8 8 8 8 1 2024 Total 961 147 814 82 82 82 82 81 80 80 80 79 78 8 - - - - - - - - - - - 1 2025 AF 559 0 559 - - - - - - - - - - 47 47 47 47 47 47 47 46 46 46 46 46 0 1 2025 ARMY 288 0 288 - - - - - - - - - - 24 24 24 24 24 24 24 24 24 24 24 24 0 1 2025 FMS (‡) 907 0 907 - - - - - - - - - - 76 76 76 76 76 76 76 75 75 75 75 75 0 1 2025 NAVY 116 0 116 - - - - - - - - - - 10 10 10 10 10 10 10 10 9 9 9 9 1 2025 Total 1,870 0 1,870 - - - - - - - - - - 157 157 157 157 157 157 157 155 154 154 154 154 - - 0 1 2026 AF 144 0 144 - - - - - - - - - - - - - - - - - - - - - - 14 14 116 1 2026 ARMY 76 0 76 7 62 (‡) (‡) (‡) (‡) (‡) (‡) (‡) 0 - - - - - - - - - - - - - - - - - - - - - - - 0 0 O C T LI M09HAI - Sidewinder (AIM-9X) Air Force - N O V D E C J A N F E B M A R A P R M A Y J U N J U L - - - - - - - - - - - - 0 0 0 A U G UNCLASSIFIED Page 12 of 16 - S E P O C T N O V D E C J A N F E B P-1 Line #16 M A R A P R M A Y J U N - 0 0 J U L - 7 A U G S E P Volume 1 - 96 === page 127 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: M09HAI / Sidewinder (AIM-9X) Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1 2026 FMS 1 2026 NAVY 1 2026 Total 1 2027 AF 1 2027 ARMY 1 2027 FMS 1 2027 NAVY 1 2027 Total (‡) (‡) (‡) (‡) (‡) PROC QTY Item Number / Title [DODIC]: Sidewinder (AIM-9X) Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 634 0 634 - - - - - - - - - - - - - - - - - - - - - - 53 53 96 0 96 - - - - - - - - - - - - - - - - - - - - - - 8 8 80 950 0 950 - - - - - - - - - - - - - - - - - - - - - - 82 82 786 791 0 791 A - - - - - - - - - - - - - - - - 791 476 0 476 A - - - - - - - - - - - - - - - - 476 358 0 358 A - - - - - - - - - - - - - - - - 358 277 0 277 A - - - - - - - - - - - - - - - - 277 1,902 0 1,902 - - - - - - - - - - - - - - - - 1,902 O C T LI M09HAI - Sidewinder (AIM-9X) Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #16 M A R A P R M A Y J U N J U L A U G 528 S E P Volume 1 - 97 === page 128 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: M09HAI / Sidewinder (AIM-9X) Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Sidewinder (AIM-9X) Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P All Up Round - Block II Prior Years Deliveries: 2205 1 2021 1 2021 AF (1) FMS (‡) (2) (‡) (3) 214 214 0 0 84 84 0 0 1 2021 NAVY 217 217 0 1 2021 Total 515 515 0 1 2022 AF (4) 148 148 0 0 104 104 0 0 157 157 0 0 1 2022 1 2022 ARMY (‡) (5) FMS (‡) (6) (‡) (7) 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 1 2022 NAVY 85 85 0 1 2022 Total 494 494 0 1 2023 AF 448 448 0 0 1 2023 ARMY 12 12 0 0 1 2023 FMS (‡) 118 118 0 0 1 2023 NAVY 84 84 0 1 2023 Total 662 662 0 1 2024 AF 256 256 0 0 1 2024 ARMY 34 34 0 0 1 2024 FMS (‡) 577 577 0 0 1 2024 NAVY 94 94 0 1 2024 Total 961 961 0 1 2025 AF 559 559 0 0 1 2025 ARMY 288 288 0 0 1 2025 FMS (‡) 907 907 0 0 1 2025 NAVY 116 116 0 1 2025 Total 1,870 1,870 0 - - - - - - - - - 1 2026 AF 144 28 116 13 12 12 12 12 12 12 12 12 7 1 2026 76 14 62 7 7 6 6 6 6 6 6 6 6 ARMY (‡) (‡) (‡) (‡) (‡) (‡) (‡) 0 - - - - - - - - - - - - - - - - - - - - - - - 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 O C T LI M09HAI - Sidewinder (AIM-9X) Air Force - N O V D E C J A N F E B M A R A P R M A Y J U N - J U L - - - - - - - - - - - - - - 0 0 0 A U G UNCLASSIFIED Page 14 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #16 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 98 === page 129 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: M09HAI / Sidewinder (AIM-9X) Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1 2026 FMS 1 2026 NAVY 1 2026 1 (‡) PROC QTY Item Number / Title [DODIC]: Sidewinder (AIM-9X) Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 634 106 528 53 53 53 53 53 53 53 53 52 52 96 16 80 8 8 8 8 8 8 8 8 8 8 Total 950 164 786 81 80 79 79 79 79 79 79 78 73 - - - - - - - - - - - - 2027 AF 791 0 791 - - - - - - - - - - 66 66 66 66 66 66 66 66 66 66 66 65 0 1 2027 ARMY 476 0 476 - - - - - - - - - - 40 40 40 40 40 40 40 40 39 39 39 39 0 1 2027 FMS 358 0 358 - - - - - - - - - - 30 30 30 30 30 30 30 30 30 30 29 29 0 1 2027 NAVY 277 0 277 - - - - - - - - - - 24 23 23 23 23 23 23 23 23 23 23 23 1 2027 Total 1,902 0 1,902 - - - - - - - - - - 160 159 159 159 159 159 159 159 158 158 157 156 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L (‡) (‡) (‡) (‡) O C T LI M09HAI - Sidewinder (AIM-9X) Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L 0 0 UNCLASSIFIED Page 15 of 16 P-1 Line #16 - - 0 0 A U G S E P Volume 1 - 99 0 === page 130 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: M09HAI / Sidewinder (AIM-9X) Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Item Number / Title [DODIC]: Sidewinder (AIM-9X) Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 300 600 2,500 1 Raytheon Missile Systems Tucson, AZ ALT Prior to Oct 1 ALT After Oct 1 1 Reorder Manufacturing PLT 9 26 Total After Oct 1 ALT Prior to Oct 1 35 ALT After Oct 1 1 Manufacturing PLT 0 Total After Oct 1 0 Remarks: MSR for AURs is per agency. The minimum cumulative total is 300 missiles. MSR for CATMs does not exist, so a quantity of 1 was input to satisfy the IDECS requirement. Max is 2500 of any configuration of missiles for all agencies each year. (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (1) (2) (3) (4) (5) (6) (7) Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. LI M09HAI - Sidewinder (AIM-9X) Air Force UNCLASSIFIED Page 16 of 16 P-1 Line #16 Volume 1 - 100 0 === page 131 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: MAMRA0 / AMRAAM Program Elements for Code B Items: N/A Other Related Program Elements: 0207163F Line Item MDAP/MAIS Code: 185 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 11,619 411 237 38 - 38 720 720 720 720 - 15,185 11,661.915 637.494 382.125 115.856 - 115.856 1,181.283 1,173.283 1,206.135 1,239.907 - 17,597.998 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 11,661.915 To FY 2031 Complete Total 53.103 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 - 53.103 584.391 382.125 115.856 - 115.856 1,181.283 1,173.283 1,206.135 1,239.907 - 17,544.895 53.103 0.000 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 - 53.103 11,715.018 584.391 382.125 115.856 - 115.856 1,181.283 1,173.283 1,206.135 1,239.907 - 17,597.998 116.596 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 99.477 2.336 2.350 2.389 - 2.389 2.439 2.487 2.535 2.583 - - - - - - - - - - - - - 1.004 1.551 1.612 3.049 - 3.049 1.641 1.630 1.675 1.722 - 1.159 Flyaway Unit Cost ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) Description: AMRAAM (Advanced Medium Range Air-to-Air Missile) is a joint United States Air Force (USAF)/Department of Navy (DON), Acquisition Category 1C program with USAF as lead service. AMRAAM is the premier all-weather, all-environment radar guided missile with improved capabilities against very low and high-altitude targets in an electronic attack environment. The current AMRAAM AIM-120D3 variant delivers improved performance via Global Positioning System (GPS) aided navigation; two-way datalink capability for enhanced aircrew survivability and improved network compatibility; and incorporates new guidance software that improves kinematic performance and weapon effectiveness. The FY27 budget request includes Multiyear Procurement (MYP) in support of AMRAAM. This MYP strategy generates efficiencies that result in greater production capacity, accelerated delivery, and lower unit costs. The MYP contracting and financing strategy leverages savings generated through economic order quantities of material from sub-vendors, enabled by the establishment of steady and consistent total order quantities. Maintaining the total order quantities is critical to supporting the industrial base stability needed to achieve and sustain production capacity. Total order quantities of AMRAAM are funded across multiple budgets and customers including the U.S. Air Force, U.S. Navy, and FMS cases. Missile configurations may vary based on warfighter needs, which include assets used for training and Weapon System Evaluation Program (WSEP). Funding for this exhibit contained in PE 0207163F. LI MAMRA0 - AMRAAM Air Force UNCLASSIFIED Page 1 of 11 P-1 Line #17 Volume 1 - 101 === page 132 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: MAMRA0 / AMRAAM Program Elements for Code B Items: N/A Other Related Program Elements: 0207163F Line Item MDAP/MAIS Code: 185 Exhibits Schedule Exhibit Type Title* P-5 AMRAAM P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 11,619 / 11,661.915 411 / 637.494 237 / 382.125 38 / 115.856 - / - 38 / 115.856 11,619 / 11,661.915 411 / 637.494 237 / 382.125 38 / 115.856 - / - 38 / 115.856 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 request for Advanced Medium Range Air-to-Air Missile (AMRAAM) includes 115,856 thousand (Qty 38) of discretionary and 1,944,956 thousand (Qty 1,279) of mandatory for a total of 2,060,812 thousand (Qty 1,317). The mandatory funds provide 1,279 All-Up-Rounds (AURs), Schedule Incentive, Containers and Cables, Telemetry Kits, Tooling/Test Equipment, unknown Diminishing Manufacturing Sources and Material Shortages (DMSMS), and Other Government Costs. The FY 2027 funds continue efforts from FY 2026 to fund all AMRAAM procurement cost elements. The FY 2026 spend plan amount for 3020 Missile Procurement includes 382,125 thousand (Qty 237) of discretionary and 298,600 thousand (Qty 186) of mandatory (reconciliation) for a total of 680,725 thousand (Qty 423). The FY 2026 Enacted amount in the Resource Summary table reflects a 25,000 thousand Congressional Add for additional AURs to accelerate Multiyear Procurement ramp and a -8,000 thousand Congressional mark for FY 2025 carryover. The FY 2025 Actuals amount in the Resource Summary table does not reflect 77,450 thousand OSW Fallout funding for additional AURs. Funding received in FY 2026 via reprogramming actions. The FY 2025 Actuals amount in the Resource Summary table does not reflect 1,626 thousand reprogrammed from BP20 MAMRA0 to BP26 MAMRA0 Initial Spares. Funding may be used to address DMSMS issues. Funding provides test and technical production support, procurement of training equipment (including telemetry instrumentation units), and tooling/test equipment upgrades to support the AMRAAM configurations. Note: Procurement quantities can change based on negotiated options/pricing bands and available funding, in accordance with Title 10, US Code Section 3069 BUY-TO-BUDGET ACQUISITION. This requirement supports performance of a full financial audit as required by Title 10 U.S.C. Chapter 9A, Sec 240-D. LI MAMRA0 - AMRAAM Air Force UNCLASSIFIED Page 2 of 11 P-1 Line #17 Volume 1 - 102 === page 133 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: MAMRA0 / AMRAAM Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: AMRAAM MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2027 OOC FY 2027 Total 237 38 - 38 11,661.915 637.494 382.125 115.856 - 115.856 11,661.915 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base 411 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2026 11,619 53.103 0.000 0.000 - 0.000 584.391 382.125 115.856 - 115.856 53.103 0.000 0.000 0.000 - 0.000 11,715.018 584.391 382.125 115.856 - 115.856 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 99.477 2.336 2.350 2.389 - 2.389 Gross/Weapon System Unit Cost ($ in Millions) 1.004 1.551 1.612 3.049 - 3.049 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years FY 2025 FY 2026 11,135 9,920.557 1.178 411 483.964 1.169 237 277.012 1.449 38 55.062 - - - 1.449 38 55.062 0.619 484 299.416 - - 0.000 - - 0.000 - - - - - - - - - Warranty - - 70.328 - - 0.000 - - 0.000 - - - - - - - - - Diminishing Manufacturing Sources/Material Shortages (DMS/MS) - - 639.856 - - 39.769 - - 12.500 - - 10.184 - - - - - 10.184 Tooling and Test Equipment - - 146.823 - - 56.388 - - 26.327 - - 7.914 - - - - - 7.914 Engineering Change Orders - - 2.755 - - 0.000 - - 0.000 - - - - - - - - - Direct Charges AIM-120 Missile All Up Round (AUR) - - - 0.056 411 23.016 0.053 237 12.656 0.056 38 2.128 - - - 0.056 38 2.128 Subtotal: Recurring Cost - - 11,079.735 - - 603.137 - - 328.495 - - 75.288 - - - - - 75.288 - - 11,079.735 - - 603.137 - - 328.495 - - 75.288 - - - - - 75.288 15.580 - - 1.326 - - 1.353 - - 1.380 - - - - - 1.380 ($ M) (Each) ($ M) ($ M) Qty (Each) ($ M) Unit Cost ($ M) Qty (Each) ($ M) Unit Cost ($ M) Total Cost FY 2027 Total 0.891 Cost Elements Unit Cost Total Cost FY 2027 OOC Qty Unit Cost Total Cost FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Hardware End Item Cost Recurring Cost AIM-120 Missile All Up (†) Round (AUR) AIM-120 Missile Captive Air Training Missile (CATM) Subtotal: Hardware Hardware End Item Cost Ancillary Equipment - AncillaryEquipment End Item Cost Recurring Cost Containers and Cables LI MAMRA0 - AMRAAM Air Force - - UNCLASSIFIED Page 3 of 11 P-1 Line #17 Volume 1 - 103 === page 134 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: MAMRA0 / AMRAAM Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: AMRAAM MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Subtotal: Recurring Cost - - 15.580 - - 1.326 - - 1.353 - - 1.380 - - - - - 1.380 Subtotal: Ancillary Equipment AncillaryEquipment End Item Cost - - 15.580 - - 1.326 - - 1.353 - - 1.380 - - - - - 1.380 Production Test/Support - - 176.431 - - 10.584 - - 20.597 - - 13.300 - - - - - 13.300 Program Support Costs (PSC) Other Government Costs - - 45.614 - - 1.052 - - 5.127 - - 2.888 - - - - - 2.888 PSC Contractor Services - - 36.664 - - 3.000 - - 3.100 - - 3.200 - - - - - 3.200 Training Equipment - - 307.891 - - 18.395 - - 23.453 - - 19.800 - - - - - 19.800 Subtotal: Support - Support End Item Cost - - 566.600 - - 33.031 - - 52.277 - - 39.188 - - - - - 39.188 Gross/Weapon System Cost 1.004 11,619 11,661.915 1.551 411 637.494 1.612 237 382.125 3.049 38 115.856 - - - 3.049 38 115.856 Support - Support End Item Cost Remarks: 1) The FY 2027 request for AMRAAM includes 115,896 thousand of discretionary 952,956 thousand of mandatory for a total of 1,068,852 thousand. The Gross Weapon System Cost (GWSC) is not inclusive of mandatory funds. With mandatory funds, the GWSC would be 1,629 thousand. 2) FY 2028 - FY 2031 reflects funding to extend Program of Record. 3) FY 2026 reflects Congressional Markup of 25,000 thousand towards additional quantities along with an 8,000 thousand mark for FY 2025 carryover, net gain of 17,000 thousand for up to 11 AURs. 4) FY 2026 NDAA Sec 8010, Title 10 of USC provided authority to AMRAAM to enter into a MYP contract starting as early as FY 2026. 5) CRA 2025 Sec 8010 removed the MYP authority for AMRAAM, resulting in a single lot procurement contract action (UCA) in Jul 2025 with definitization in Feb 2026. Lot 39 procured 368 USAF D3 AURs. Lot 40 Option will procure up to 461 USAF D3 AURs. 6) FY 2026 request for AMRAAM included 365,125 thousand discretionary and 300,000 thousand mandatory (reconciliation) for a total of 665,125 thousand. The mandatory funds were provided as FT: KC, ESP: 62 funds as part of the One Big Beautiful Bill Act (OBBBA), P.L. 119-21, Section 20004, Line 12. The mandatory funds procure up to 186 AMRAAM AIM-120D3 AURs on Lot 40 Option (250,000 thousand) and Diminishing Manufacturing Sources and Material Shortages (DMSMS) requirements (50,000 thousand). 7) FY 2025 Total Obligation Authority (TOA) reflects a HAC-D mark of 57,603 thousand for FY 2024 Carryover. FY 2025 CRA removed MYP authority. 8) FY 2025 TOA includes tranche funding received via reprogramming actions for the following: - Ukraine Tranche 27: 12,500 thousand for obsolescence - Ukraine Tranche 28: 112,949 thousand for Lot 39 AURs (QTY: 85) - Israel Tranches 3 & 4: 69,172 thousand for Lot 39 AURs (QTY: 52) 9) FY 2024 Advanced Procurement funding, 53,100 thousand, was awarded in Jun 2025 for obsolete parts to support future lot buys. (†) indicates the presence of a P-5a LI MAMRA0 - AMRAAM Air Force UNCLASSIFIED Page 4 of 11 P-1 Line #17 Volume 1 - 104 === page 135 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements AIM-120 Missile All Up Round (†) (AUR) AIM-120 Missile All Up Round (†) (AUR) AIM-120 Missile All Up Round (†) (AUR) AIM-120 Missile All Up Round (†) (AUR) AIM-120 Missile All Up Round (†) (AUR) AIM-120 Missile All Up Round (†) (AUR) AIM-120 Missile All Up Round (†) (AUR) (†) O O C P-1 Line Item Number / Title: MAMRA0 / AMRAAM Method/Type or Funding Vehicle Item Number / Title [DODIC]: AMRAAM Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty RFP Issue Date FY Contractor and Location 2021 Raytheon Missile Systems / Tucson, AZ SS / FPIF Eglin AFB Aug 2022 Feb 2023 269 0.891 Y Sep 2018 2022 Raytheon Missile Systems / Tucson, AZ SS / FPIF Eglin AFB Aug 2022 Sep 2025 317 0.880 Y Sep 2018 2023 Raytheon Missile Systems / Tucson, AZ SS / FPIF Eglin AFB Jun 2023 Sep 2026 319 0.986 Y Sep 2021 2024 Raytheon Missile Systems / Tucson, AZ SS / FPIF Eglin AFB Sep 2024 Sep 2027 457 0.834 Y Jan 2024 2025 Raytheon Missile Systems / Tucson, AZ SS / FPIF AFLCMC/EB - Weapons Jul 2025 Sep 2028 411 1.178 Y Jun 2024 2026 Raytheon Missile Systems / Tucson, AZ SS / FPIF AFLCMC/EB - Weapons May 2026 Sep 2029 237 1.169 Y Jun 2025 2027 Raytheon Missile Systems / Tucson, AZ SS / FPIF AFLCMC/EB - Weapons Oct 2026 Sep 2030 38 1.449 Y May 2026 (Each) indicates the presence of a P-21 Remarks: Unit Cost is quantity dependent; changes in total quantity directly impact unit price for USAF, DoN, and Foreign Military Sales. Unit cost will be the same for each variant/service. LI MAMRA0 - AMRAAM Air Force UNCLASSIFIED Page 5 of 11 P-1 Line #17 Volume 1 - 105 === page 136 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: MAMRA0 / AMRAAM Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: AMRAAM Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N Calendar Year 2023 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P AIM-120 Missile All Up Round (AUR) Prior Years Deliveries: 9773 1 2021 1 2021 AF (1) NAVY (‡) (2) (‡) (3) 269 0 269 A - - - - - - 67 - - - - - - - 202 174 0 174 A - - - - - - 43 - - - - - - - 131 1 2021 FMS 164 0 164 A - - - - - - 41 - - - - - - - 123 1 2021 Total 607 0 607 - - - - - - 151 - - - - - - - 456 1 2022 AF 317 0 317 A - - - - - - - - - - - - - - 317 1 2022 547 0 547 A - - - - - - - - - - - - - - 547 FMS (‡) 1 2022 NAVY 1 2022 Total 1 2023 AF 1 2023 FMS 1 2023 NAVY 1 2023 1 (‡) 85 0 85 A - - - - - - - - - - - - - - 85 949 0 949 - - - - - - - - - - - - - - 949 319 0 319 A - - - - 319 364 0 364 A - - - - 364 306 0 306 A - - - - 306 Total 989 0 989 - - - - 989 2024 AF 457 0 457 457 1 2024 FMS 350 0 350 350 1 2024 NAVY 235 0 235 235 1 2024 Total 1,042 0 1,042 1,042 1 2025 AF 411 0 411 411 1 2025 FMS 725 0 725 725 1 2025 NAVY 185 0 185 185 1 2025 Total 1,321 0 1,321 1,321 1 2026 AF 237 0 237 237 1 2026 FMS 923 0 923 923 1 2026 NAVY 51 0 51 51 1 2026 Total 1,211 0 1,211 1,211 1 2027 AF 1 2027 FMS 1 2027 NAVY 1 2027 Total (‡) (‡) (‡) (‡) (‡) (‡) (‡) (‡) (‡) (‡) 38 0 38 38 700 0 700 700 131 0 131 131 869 0 869 869 O C T LI MAMRA0 - AMRAAM Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 106 === page 137 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: MAMRA0 / AMRAAM Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: AMRAAM Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P AIM-120 Missile All Up Round (AUR) Prior Years Deliveries: 9773 1 2021 1 2021 AF (1) NAVY (‡) (2) (‡) (3) 269 67 202 - - - - - - - - - - - - - - 67 - - 67 - - 68 0 174 43 131 - - - - - - - - - - - - - - 43 - - 44 - - 44 0 1 2021 FMS 164 41 123 - - - - - - - - - - - - - - 41 - - 41 - - 41 1 2021 Total 607 151 456 - - - - - - - - - - - - - - 151 - - 152 - - 153 - - - 0 1 2022 AF 317 0 317 - - - - - - - - - - - - - - - - - - - - - - - 79 238 1 2022 FMS 547 0 547 - - - - - - - - - - - - - - - - - - - - - - - 136 411 (‡) 1 2022 NAVY 1 2022 Total 1 2023 AF 1 2023 FMS 1 2023 NAVY 1 2023 1 (‡) 0 85 0 85 - - - - - - - - - - - - - - - - - - - - - - - 21 64 949 0 949 - - - - - - - - - - - - - - - - - - - - - - - 236 713 319 0 319 - - - - - - - - - - - - - - - - - - - - - - - - 319 364 0 364 - - - - - - - - - - - - - - - - - - - - - - - - 364 306 0 306 - - - - - - - - - - - - - - - - - - - - - - - - 306 Total 989 0 989 - - - - - - - - - - - - - - - - - - - - - - - - 989 2024 AF 457 0 457 A - - - - - - - - - - - - - 457 1 2024 FMS 350 0 350 A - - - - - - - - - - - - - 350 1 2024 NAVY 235 0 235 A - - - - - - - - - - - - - 235 1 2024 Total 1,042 0 1,042 - - - - - - - - - - - - - 1,042 1 2025 AF 411 0 411 A - - - 411 1 2025 FMS 725 0 725 A - - - 725 1 2025 NAVY 185 0 185 A - - - 185 1 2025 Total 1,321 0 1,321 - - - 1,321 1 2026 AF 237 0 237 237 1 2026 FMS 923 0 923 923 1 2026 NAVY 51 0 51 51 1 2026 Total 1,211 0 1,211 1,211 1 2027 AF 1 2027 FMS 1 2027 NAVY 1 2027 Total (‡) (‡) (‡) (‡) (‡) (‡) (‡) (‡) (‡) (‡) 38 0 38 38 700 0 700 700 131 0 131 131 869 0 869 869 O C T LI MAMRA0 - AMRAAM Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 107 === page 138 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: MAMRA0 / AMRAAM Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: AMRAAM Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P AIM-120 Missile All Up Round (AUR) Prior Years Deliveries: 9773 1 2021 1 2021 AF (1) NAVY (‡) (2) (‡) (3) 269 269 0 0 174 174 0 0 1 2021 FMS 164 164 0 1 2021 Total 607 607 0 - - - - - - - - - 1 2022 AF 317 79 238 - - 79 - - 79 - - 80 0 1 2022 547 136 411 - - 137 - - 137 - - 137 0 FMS (‡) (‡) 0 - - - - - - - - - - - - - - - 0 1 2022 NAVY 85 21 64 - - 21 - - 21 - - 22 1 2022 Total 949 236 713 - - 237 - - 237 - - 239 - - - - - - - - - - - - 1 2023 AF 319 0 319 - - - - - - - - - - - 79 - - 80 - - 80 - - 80 0 1 2023 FMS 364 0 364 - - - - - - - - - - - 91 - - 91 - - 91 - - 91 0 1 2023 NAVY 306 0 306 - - - - - - - - - - - 76 - - 76 - - 77 - - 77 1 2023 Total 989 0 989 - - - - - - - - - - - 246 - - 247 - - 248 - - 248 - - - 0 1 2024 AF 457 0 457 - - - - - - - - - - - - - - - - - - - - - - - 114 343 1 2024 FMS 350 0 350 - - - - - - - - - - - - - - - - - - - - - - - 88 262 1 2024 NAVY 235 0 235 - - - - - - - - - - - - - - - - - - - - - - - 58 177 1 2024 Total 1,042 0 1,042 - - - - - - - - - - - - - - - - - - - - - - - 260 782 1 2025 AF 411 0 411 - - - - - - - - - - - - - - - - - - - - - - - - 411 1 2025 FMS 725 0 725 - - - - - - - - - - - - - - - - - - - - - - - - 725 1 2025 NAVY 185 0 185 - - - - - - - - - - - - - - - - - - - - - - - - 185 1 2025 Total 1,321 0 1,321 - - - - - - - - - - - - - - - - - - - - - - - - 1,321 1 2026 AF 237 0 237 A - - - - - - - - - - - - - - - - - 237 1 2026 FMS 923 0 923 A - - - - - - - - - - - - - - - - - 923 1 2026 NAVY 51 0 51 A - - - - - - - - - - - - - - - - - 51 1 2026 Total 1,211 0 1,211 - - - - - - - - - - - - - - - - - 1,211 1 2027 AF 1 2027 FMS 1 2027 NAVY 1 2027 Total (‡) (‡) (‡) (‡) (‡) (‡) (‡) (‡) (‡) (‡) 0 - - - 0 0 38 0 38 A - - - - - - - - - - - - 38 700 0 700 A - - - - - - - - - - - - 700 131 0 131 A - - - - - - - - - - - - 131 869 0 869 - - - - - - - - - - - - 869 O C T LI MAMRA0 - AMRAAM Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 108 === page 139 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: MAMRA0 / AMRAAM Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: AMRAAM Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P AIM-120 Missile All Up Round (AUR) Prior Years Deliveries: 9773 1 2021 1 2021 AF (1) NAVY (‡) (2) (‡) (3) 269 269 0 0 174 174 0 0 1 2021 FMS 164 164 0 1 2021 Total 607 607 0 1 2022 AF 317 317 0 0 1 2022 547 547 0 0 FMS (‡) (‡) 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 1 2022 NAVY 85 85 0 1 2022 Total 949 949 0 1 2023 AF 319 319 0 0 1 2023 FMS 364 364 0 0 1 2023 NAVY 306 306 0 1 2023 Total 989 989 0 - - - - - - - - - 1 2024 AF 457 114 343 - - 114 - - 114 - - 115 0 1 2024 FMS 350 88 262 - - 88 - - 87 - - 87 0 1 2024 NAVY 235 58 177 - - 59 - - 59 - - 59 1 2024 Total 1,042 260 782 - - 261 - - 260 - - 261 - - - - - - - - - - - - 1 2025 AF 411 0 411 - - - - - - - - - - - 102 - - 103 - - 103 - - 103 0 1 2025 FMS 725 0 725 - - - - - - - - - - - 182 - - 181 - - 181 - - 181 0 1 2025 NAVY 185 0 185 - - - - - - - - - - - 47 - - 46 - - 46 - - 46 1 2025 Total 1,321 0 1,321 - - - - - - - - - - - 331 - - 330 - - 330 - - 330 - - - 0 1 2026 AF 237 0 237 - - - - - - - - - - - - - - - - - - - - - - - 59 178 1 2026 FMS 923 0 923 - - - - - - - - - - - - - - - - - - - - - - - 230 693 1 2026 NAVY 51 0 51 - - - - - - - - - - - - - - - - - - - - - - - 12 39 1 2026 Total 1,211 0 1,211 - - - - - - - - - - - - - - - - - - - - - - - 301 910 1 2027 AF 1 2027 FMS 1 2027 NAVY 1 2027 Total (‡) (‡) (‡) (‡) (‡) (‡) (‡) (‡) (‡) (‡) 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 - - - - - - - - - - - - - - - 0 0 - - - 0 0 38 0 38 - - - - - - - - - - - - - - - - - - - - - - - - 38 700 0 700 - - - - - - - - - - - - - - - - - - - - - - - - 700 131 0 131 - - - - - - - - - - - - - - - - - - - - - - - - 131 869 0 869 - - - - - - - - - - - - - - - - - - - - - - - - 869 O C T LI MAMRA0 - AMRAAM Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 109 === page 140 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: MAMRA0 / AMRAAM Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: AMRAAM Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2031 M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P AIM-120 Missile All Up Round (AUR) Prior Years Deliveries: 9773 1 2021 1 2021 AF (1) NAVY (‡) (2) (‡) (3) 269 269 0 0 174 174 0 0 1 2021 FMS 164 164 0 1 2021 Total 607 607 0 1 2022 AF 317 317 0 0 1 2022 547 547 0 0 FMS (‡) (‡) 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 1 2022 NAVY 85 85 0 1 2022 Total 949 949 0 1 2023 AF 319 319 0 0 1 2023 FMS 364 364 0 0 1 2023 NAVY 306 306 0 1 2023 Total 989 989 0 1 2024 AF 457 457 0 0 1 2024 FMS 350 350 0 0 1 2024 NAVY 235 235 0 1 2024 Total 1,042 1,042 0 1 2025 AF 411 411 0 0 1 2025 FMS 725 725 0 0 1 2025 NAVY 185 185 0 1 2025 Total 1,321 1,321 0 - - - - - - - - - 1 2026 AF 237 59 178 - - 59 - - 60 - - 59 0 1 2026 FMS 923 230 693 - - 231 - - 231 - - 231 0 1 2026 NAVY 51 12 39 - - 13 - - 13 - - 13 1 2026 Total 1,211 301 910 - - 303 - - 304 - - 303 - - 1 2027 AF 38 0 38 - - - - - - - - - - - 1 2027 700 0 700 - - - - - - - - - - - 131 0 131 - - - - - - - - - - 869 0 869 - - - - - - - - - - FMS (‡) (‡) (‡) (‡) (‡) (‡) (‡) (‡) (‡) 1 2027 NAVY 1 2027 Total (‡) 0 - - - - - - - - - - - - - - - - - - - - - - - 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 O C T LI MAMRA0 - AMRAAM Air Force - N O V D E C J A N F E B M A R A P R M A Y J U N - - - - - - - - - - - - - - - 0 0 J U L - - 9 - - 175 - - - 32 - - 216 - A U G UNCLASSIFIED Page 10 of 11 - S E P O C T N O V - - - - - - - 9 - - 10 - - 10 0 175 - - 175 - - 175 0 - 33 - - 33 - - 33 - 217 - - 218 - - 218 D E C J A N F E B P-1 Line #17 M A R A P R M A Y J U N - - - 0 0 J U L A U G S E P Volume 1 - 110 0 === page 141 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: MAMRA0 / AMRAAM Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Item Number / Title [DODIC]: AMRAAM Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Raytheon Missile Systems Tucson, AZ MSR For 2027 1-8-5 For 2027 MAX For 2027 400 1,200 1,200 ALT Prior to Oct 1 ALT After Oct 1 9 Reorder Manufacturing PLT 1 47 Total After Oct 1 ALT Prior to Oct 1 48 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 Remarks: Due to Service specific guidance, differences exist between USAF and DoN Initial and Reorder Procurement Leadtime. (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (1) (2) (3) Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. LI MAMRA0 - AMRAAM Air Force UNCLASSIFIED Page 11 of 11 P-1 Line #17 Volume 1 - 111 0 === page 142 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 112 === page 143 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: PRDTA2 / Predator Hellfire Missile Program Elements for Code B Items: N/A Other Related Program Elements: 0305219F Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 5.790 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 - 5.790 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 5.790 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 - 5.790 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 5.790 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 - 5.790 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: In FY2024, PRDTA2, Hellfire was completed and no future procurements were expected. In FY2025, PRDTA2, Hellfire received $5.79M of ESP coded funding for "O2--ISRAEL-HAMAS WAR DIRECT SUPPORT" for reprogramming efforts. The Army is the Lead Service for the HELLFIRE Missile program with Air Force missiles being procured through the Army's Redstone Arsenal. HELLFIRE missiles (all variants) provide precision-kill capability and has become a key weapon in overseas operations. Laser HELLFIRE uses semi-active laser terminal guidance. The latest variant provides for point target precision strike and is effective against countermeasures. The HELLFIRE missiles are used by the MQ-9 Reaper aircraft. HELLFIRE procurement funding supports the entire HELLFIRE system to include resolution of obsolescence, end-of-life buys, safety, insensitive munitions, reliability, weapon integration activities, test sets, engineering changes, modifications, facilitation, production ramp-up activities and production issues. HELLFIRE unit cost may vary based on procurement quantities of Lead Service, other Services and/or Foreign Military Sales (FMS) for HELLFIRE. Prior to FY08, HELLFIRE missiles were procured under the Predator PE 0305219F. Note: These funds may also procure inventoried items which may not be procured on an annual basis and could be required on an emerging basis. Variations to cover critical shortfalls to inventory objectives as well as actual and planned expenditures will be addressed during execution year. Procurement quantities can change based on negotiated options/pricing bands and available funding, in accordance with Title 10, U.S Code Section 2308 BUY-TO-BUDGET ACQUISITION. Procurements for the execution year may vary due to changes in inventory objectives. Combatant commanders' requirements for Operational Plans influence these objectives, which are updated throughout the year. Funds may be used to address production Diminishing Manufacturing Sources (DMS)/Material Shortages/Obsolescence issues through studies, bridge buys, life of type buys, supplier/parts replacement, to include electronic components used commercially and in short supply, and qualification activities to preserve future production capabilities and capacities. Funding for this exhibit contained in PE 0201109F. LI PRDTA2 - Predator Hellfire Missile Air Force UNCLASSIFIED Page 1 of 2 P-1 Line #18 Volume 1 - 113 === page 144 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: PRDTA2 / Predator Hellfire Missile Program Elements for Code B Items: N/A Other Related Program Elements: 0305219F Line Item MDAP/MAIS Code: N/A Justification: There is no FY27 budget request. LI PRDTA2 - Predator Hellfire Missile Air Force UNCLASSIFIED Page 2 of 2 P-1 Line #18 Volume 1 - 114 === page 145 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: SDB000 / Small Diameter Bomb Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 439 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 39,329 1,237 511 220 - 220 500 500 400 500 - 43,197 2,255.502 261.681 41.510 44.596 - 44.596 84.530 86.209 87.828 89.537 0.000 2,951.393 - - - - - - - - - 41.510 44.596 - 44.596 84.530 86.209 87.828 89.537 0.000 - - - - - - - - - 41.510 44.596 - 44.596 84.530 86.209 87.828 89.537 0.000 2,255.502 2,255.502 261.681 261.681 To FY 2031 Complete Total 2,951.393 2,951.393 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) 0.052 0.198 0.067 0.166 - 0.166 0.150 0.155 0.199 0.162 - 0.062 Gross/Weapon System Unit Cost ($ in Millions) 0.057 0.212 0.081 0.203 - 0.203 0.169 0.172 0.220 0.179 - 0.068 Description: GBU-39/B: Small Diameter Bomb Increment I (SDB I) is an Air Force ACAT II program providing increased kills per sortie on current and future aircraft platforms. SDB I addresses the following specific warfighter requirements: multiple kills per pass; multiple ordnance carriage; adverse weather; precision munitions capability; capability against fixed and stationary targets; reduced munitions footprint; increased weapons effectiveness; minimized potential for collateral damage; reduced susceptibility of munitions to countermeasures; and standoff or Close Air Support (CAS) operational capability. Threshold aircraft is the F-15E. Objective aircraft include: F-22A, F-16C/D Block 30/40/50, F-35A, B-1, A-10, B-52, B-21, MQ-9, and AC-130W/J. Integrated platforms include: F-15E, F-22A, AC-130W/J, F-16C/D Block 30/40/50, and F-35A. SDB I completed IOT&E in Jun 2006 and commenced Full Rate Production (FRP) in Dec 2006. GBU-39A/B: Small Diameter Bomb I Focused Lethality Munition (FLM) is a low collateral damage variant of SDB I. FLM has a carbon fiber warhead case which disintegrates upon fill detonation, minimizing fragmentation effects to personnel and property. GBU-39B/B: Laser SDB is a laser variant of the baseline SDB I. Laser SDB is a 250-pound class, air-launched weapon with deployable wings to achieve standoff range, has a laser seeker to self-target and a GPS-only mode, and has a Height-Of-Burst (HOB) fuze to provide selectable weapons effects. GBU-39E/B: The GBU-39E/B is a 250-pound GPS-aided munition with precise positioning services provided by M-Code, and it is a small, autonomous, day or night, adverse weather, conventional, air-to-ground precision glide weapon. BRU-61: The Bomb Rack Unit (BRU-61) is a four-place weapon carriage system used on aircraft for releasing GBU-39 weapons. It features a pneumatic ejector system and communicates with the aircraft and attached weapons through MIL-STD-1760 and JMMI interfaces, respectively. The two variants, BRU-61/A and BRU-61B/A, differ in their power supply and voltage handling. BRU-61/A uses 115 VAC aircraft power and converts it to 28 VDC for weapons. BRU-61B/A accepts either 115 VAC or 270 VDC aircraft power, converting it to either 28 or 32 VDC for weapons. SDB I weapons and weapon containers are procured together as a system. BRU-61 weapon carriage system and the container are procured together as well. Individual containers can be procured separately as requirements dictate. SDB I procurement supports current combat operations and replenishment of SDB I weapons and its variants used in these operations. It leverages common component development, in collaboration with other weapon systems, to reduce redundant costs between systems with similar subsystems requirements. Invests in analytical, information management, data management, digital environments, networks, facilities, and security infrastructure upgrades directly supporting development and sustainment of this program's capabilities, while leveraging DoW and DAF enterprise IT solutions. For example, the integration of a qualified M-Code capable GPS receivers. Funding may also be used to resolve performance deficiencies identified in the system. Funding may be used to address Diminishing LI SDB000 - Small Diameter Bomb Air Force UNCLASSIFIED Page 1 of 11 P-1 Line #19 Volume 1 - 115 === page 146 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: SDB000 / Small Diameter Bomb Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 439 Manufacturing Sources (DMS) issues. This will be accomplished through studies, bridge buys, life of type buys, supplier/parts replacement, and qualification (including flight/ground test activities) to preserve future production capabilities and capacities. Procurements for the execution year may vary due to changes in inventory objectives. Combatant commanders' requirements for Operational Plans influence these objectives, which are updated throughout the year. Funding for this exhibit is contained in PE 0207330F. Funding was contained in PE 0207327F for FY 2022 and prior. LI SDB000 - Small Diameter Bomb Air Force UNCLASSIFIED Page 2 of 11 P-1 Line #19 Volume 1 - 116 === page 147 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: SDB000 / Small Diameter Bomb Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 439 Exhibits Schedule Exhibit Type Title* P-5 Small Diameter Bomb P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 39,329 / 2,255.502 1,237 / 261.681 511 / 41.510 220 / 44.596 - / - 220 / 44.596 39,329 / 2,255.502 1,237 / 261.681 511 / 41.510 220 / 44.596 - / - 220 / 44.596 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funds procure SDB Increment I weapons, BRU-61, Operational Flight Program (OFP) updates and test, obsolescence contracts, integration efforts to support OFP, SMC-2, and PSC Other Government Costs: travel, Government Purchase Card (GPC), and other operational costs. FY25 actuals include $216.824 million of assets sold from stock to Foreign Military Sales (FMS) countries under 40 U.S.C. Section 503 and Arms Export Control Act Section 2, according to OMB Circular A-11, Section 83.5. The quantity associated with the assets sold from stock is projected to be 1,971. The significant increase in end item unit cost from FY 2026 to FY 2027 is due to the planned additional of M-code capability in the FY 2027 Lot buy (GBU-39E/B). This procurement will result in a drastic rise in unit pricing but will also provide a significant increase in warfighter capability. Procurement quantities will be combined with expected Foreign Military Sales (FMS) buys to meet minimum order quantity requirement. Procurement quantities can change based on negotiated options/pricing bands and available funding, in accordance with Title 10, U.S Code Section 2308 BUY-TO-BUDGET ACQUISITION. This program leverages Digital acquisition tenets of open, agile, and digital. Invests in analytical, information management, data management, digital environments, networks, facilities, and security infrastructure upgrades directly supporting development and sustainment of this program's capabilities, while leveraging Department of War (DoW) and Department of the Air Force (DAF) enterprise IT solutions. Funds may be used to address production Diminishing Manufacturing Sources (DMS)/Material Shortages/Obsolescence issues through studies, bridge buys, life of type buys, supplier/parts replacement, to include electronic components used commercially and in short supply, and qualification activities to preserve future production capabilities and capacities. These funds may also procure inventoried items which may not be procured on an annual basis and could be required on an emerging basis. Variations to cover critical shortfalls to inventory objectives as well as actual and planned expenditures will be addressed during execution year. LI SDB000 - Small Diameter Bomb Air Force UNCLASSIFIED Page 3 of 11 P-1 Line #19 Volume 1 - 117 === page 148 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: SDB000 / Small Diameter Bomb Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Small Diameter Bomb MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2026 FY 2027 Total 511 220 - 220 2,255.502 261.681 41.510 44.596 - 44.596 - - - - 41.510 44.596 - 44.596 - - - - 41.510 44.596 - 44.596 - - 2,255.502 Plus CY Advance Procurement ($ in Millions) 261.681 - Total Obligation Authority ($ in Millions) FY 2027 OOC 1,237 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2027 Base 39,329 - 2,255.502 261.681 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) - - - - - - 0.057 0.212 0.081 0.203 - 0.203 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Qty Total Cost 2,038.264 (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Flyaway - Flyaway End Item Cost Recurring Cost (†) 0.052 39,329 SDB Increment I FMS COLLECTIONS 0.067 414 27.841 0.067 511 34.285 0.166 220 36.411 - - - 0.166 220 36.411 - - 0.263 823 216.824 - - - - - - - - - - - - Subtotal: Recurring Cost - - Subtotal: Flyaway - Flyaway End Item Cost - - 2,038.264 - - 244.665 - - 34.285 - - 36.411 - - - - - 36.411 2,038.264 - - 244.665 - - 34.285 - - 36.411 - - - - - 36.411 Training Equipment - Operational Flight Program Updates & Test - 2.900 - - - - - - - - - - - - - - - - - 24.660 - - 0.000 - - 2.175 - - 2.300 - - - - - 2.300 Production Testing - - 51.117 - - 8.363 - - 0.000 - - 0.000 - - - - - 0.000 PSC Contractor Services - - 15.347 - - 1.850 - - 0.000 - - 1.900 - - - - - 1.900 PSC Other Government Costs - - 3.786 - - 0.860 - - 2.050 - - 0.485 - - - - - 0.485 Integration - - 63.971 - - 5.943 - - 3.000 - - 3.500 - - - - - 3.500 Logistics Support - - 0.714 - - - - - - - - - - - - - - - Obsolescence Contracts - - 54.743 - - - - - - - - - - - - - - - Subtotal: Support - Support Cost - - 217.238 - - 17.016 - - 7.225 - - 8.185 - - - - - 8.185 Gross/Weapon System Cost 0.057 39,329 2,255.502 0.212 1,237 261.681 0.081 511 41.510 0.203 220 44.596 - - - 0.203 220 44.596 SDB Increment I - Support - Support Cost LI SDB000 - Small Diameter Bomb Air Force UNCLASSIFIED Page 4 of 11 P-1 Line #19 Volume 1 - 118 === page 149 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 P-1 Line Item Number / Title: SDB000 / Small Diameter Bomb ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Small Diameter Bomb MDAP/MAIS Code: Remarks: The increase in unit cost from FY 2026 to FY 2027 is due to the planned M-code purchase in FY 2027. This procurement will result in a significant rise in unit pricing but will also provide a significant increase in warfighter capability. End item procurements will bundle quantities with Foreign Military Sales (FMS) customers to meet minimum order quantity requirement. Unit costs fluctuate based on total lot quantity. IDIQ contract is currently undefinitized. Program Support Costs (PSC) Contractor Services: Engineering, Professional, and Administrative Support Services (EPASS) contract support. PSC Other Government Costs: Travel and Government Purchase Card (GPC). FY 2025 actuals include $216.824 million of direct collections of assets sold from stock to Foreign Military Sales (FMS) countries under 40 U.S.C. Section 503 and Arms Export Control Act Section 2, according to OMB Circular A-11, Section 83.5. The quantity associated with the assets sold from stock is projected to be 1,971. FY 2025 quantity (823) and unit cost (0.263 thousand) for SDB Increment I - assets sold from stock shown in the P5 is incorrect due to the erroneous addition of 1,237 total quantity in the "Resource Summary". The incorrect quantity skews the unit cost. Correct FY 2025 data should be: SDB Increment I (Appropriated): 414 qty x 0.067 thousand unit cost SDB Increment I - (Assets Sold From Stock): 1,971 qty x 0.110 thousand unit cost (higher due to projected M-Code pricing) (†) indicates the presence of a P-5a LI SDB000 - Small Diameter Bomb Air Force UNCLASSIFIED Page 5 of 11 P-1 Line #19 Volume 1 - 119 === page 150 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (†) O O C P-1 Line Item Number / Title: SDB000 / Small Diameter Bomb FY Contractor and Location Method/Type or Funding Vehicle Item Number / Title [DODIC]: Small Diameter Bomb Location of PCO Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($ M) RFP Issue Date SDB Increment I (†) 2023 Boeing / St Louis MO SS / FPIF AFLCMC Hill AFB May 2023 Jan 2026 1,190 0.041 Y Aug 2016 SDB Increment I (†) 2024 Boeing / St Louis MO SS / FPIF AFLCMC Hill AFB Sep 2024 Nov 2026 604 0.081 Y Aug 2022 SDB Increment I (†) 2025 Boeing / St Louis MO SS / FPIF AFLCMC Hill AFB Nov 2026 Nov 2027 414 0.067 Y Aug 2022 SDB Increment I (†) 2026 Boeing / St Louis MO SS / FPIF AFLCMC Hill AFB Nov 2026 Nov 2027 511 0.067 Y Aug 2022 SDB Increment I (†) 2027 Boeing / St Louis MO SS / FPIF AFLCMC Hill AFB Mar 2027 Mar 2028 220 0.166 Y Aug 2022 indicates the presence of a P-21 Remarks: - RFP issued Aug 2022 for follow on Indefinite Delivery/ Indefinite Quantity (IDIQ) contract with a 10-year ordering period consisting of an initial 5-year ordering period with pricing and an additional 5-year ordering period to be priced at a later date. LI SDB000 - Small Diameter Bomb Air Force UNCLASSIFIED Page 6 of 11 P-1 Line #19 Volume 1 - 120 === page 151 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: SDB000 / Small Diameter Bomb Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE Item Number / Title [DODIC]: Small Diameter Bomb Fiscal Year 2023 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P SDB Increment I Prior Years Deliveries: 37535 1 2023 AF 1,190 0 1,190 A - - - - - - - - - - - - - - - - - 1,190 1 2023 DCS (‡) 2,272 0 2,272 A - - - - - - - - - - - - - - - - - 2,272 1 2023 FMS (‡) 3,225 0 3,225 A - - - - - - - - - - - - - - - - - 3,225 1 2023 Total 6,687 0 6,687 - - - - - - - - - - - - - - - - - 6,687 1 2024 AF 604 0 604 A - 604 1 2025 AF 414 0 414 414 1 2026 AF 511 0 511 511 1 2027 AF 220 0 220 220 1 2027 FMS 1,000 0 1,000 1,000 1 2027 Total 1,220 0 1,220 (‡) 1,220 O C T LI SDB000 - Small Diameter Bomb Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #19 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 121 === page 152 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: SDB000 / Small Diameter Bomb Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE Item Number / Title [DODIC]: Small Diameter Bomb Fiscal Year 2025 PROC QTY ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P SDB Increment I Prior Years Deliveries: 37535 1 2023 AF 1,190 0 1,190 - - - - - - - - - - - - - - - 238 238 238 238 238 - - - - 0 1 2023 DCS (‡) 2,272 0 2,272 - - - - - - - - - - - - - - - - - - - - - - - - 2,272 1 2023 FMS (‡) 3,225 0 3,225 - - - - - - - - - - - - - - - - - - - - 645 645 645 645 645 1 2023 Total 6,687 0 6,687 - - - - - - - - - - - - - - - 238 238 238 238 238 645 645 645 645 2,917 1 2024 AF 604 0 604 - - - - - - - - - - - - - - - - - - - - - - - - 604 1 2025 AF 414 0 414 414 1 2026 AF 511 0 511 511 1 2027 AF 220 0 220 220 1 2027 FMS 1,000 0 1,000 1,000 1 2027 Total 1,220 0 1,220 (‡) 1,220 O C T LI SDB000 - Small Diameter Bomb Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #19 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 122 === page 153 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: SDB000 / Small Diameter Bomb Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Small Diameter Bomb Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P SDB Increment I Prior Years Deliveries: 37535 1 2023 AF 1,190 1,190 0 - - - - - - - - - - - - - - 0 1 2023 DCS (‡) 2,272 0 2,272 - - 189 189 189 189 189 189 189 189 190 190 190 190 0 1 2023 FMS (‡) 3,225 2,580 645 645 - - - - - - - - - - - - - 1 2023 Total 6,687 3,770 2,917 645 - 189 189 189 189 189 189 189 189 190 190 190 190 - - - - - - - - - - 0 1 2024 AF 604 0 604 - 604 1 2025 AF 414 0 414 A - - - - - - - - - - - - 34 34 34 34 34 34 35 35 35 35 35 35 1 2026 AF 511 0 511 A - - - - - - - - - - - - 42 42 42 42 42 43 43 43 43 43 43 43 1 2027 AF 220 0 220 A - - - - - - - - - - - - 18 18 18 18 18 18 18 94 1 2027 FMS 1,000 0 1,000 A - - - - - - - - - - - - 83 83 83 83 83 83 83 419 1 2027 Total 1,220 0 1,220 513 (‡) LI SDB000 - Small Diameter Bomb Air Force 0 O C T N O V 0 D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #19 101 101 101 101 101 101 101 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 123 === page 154 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: SDB000 / Small Diameter Bomb Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Small Diameter Bomb Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P SDB Increment I Prior Years Deliveries: 37535 1 2023 AF 1,190 1,190 0 0 1 2023 DCS (‡) 2,272 2,272 0 0 1 2023 FMS (‡) 3,225 3,225 0 1 2023 Total 6,687 6,687 0 1 2024 AF 604 604 0 1 2025 AF 414 379 35 35 1 2026 AF 511 468 43 43 1 2027 AF 220 126 94 18 19 19 19 19 1 2027 FMS 1,000 581 419 83 84 84 84 84 1 2027 Total 1,220 707 513 101 103 103 103 103 O C T N O V D E C J A N F E B (‡) LI SDB000 - Small Diameter Bomb Air Force 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 0 0 0 M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #19 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 124 0 === page 155 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: SDB000 / Small Diameter Bomb Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Item Number / Title [DODIC]: Small Diameter Bomb Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 500 10,000 10,000 1 Boeing - St Louis MO ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 9 Manufacturing PLT 6 Total After Oct 1 12 18 Remarks: (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. MSR of 500 includes Air Force and Foreign Military Sales (FMS) combined as a total lot buy. FY 2027 Air Force-only Production is below MSR, but the remaining production will be made up with Air Force Reimbursable Authority and FMS. (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI SDB000 - Small Diameter Bomb Air Force UNCLASSIFIED Page 11 of 11 P-1 Line #19 Volume 1 - 125 === page 156 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 126 === page 157 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: SDB002 / Small Diameter Bomb II Program Elements for Code B Items: 0207327F Other Related Program Elements: 0207327F Line Item MDAP/MAIS Code: 439 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 5,279 1,228 806 373 - 373 256 258 248 291 14,285 23,024 1,527.038 407.222 307.743 194.509 - 194.509 136.148 134.702 137.232 139.903 4,736.601 7,721.098 1,527.038 1,527.038 407.222 407.222 307.743 307.743 - - 194.509 - - 194.509 - 194.509 194.509 136.148 136.148 134.702 134.702 137.232 137.232 To FY 2031 Complete 139.903 139.903 Total 4,736.601 7,721.098 4,736.601 7,721.098 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 2.298 - - - - - - - - - - 2.298 Flyaway Unit Cost ($ in Millions) 0.207 0.247 0.277 0.289 - 0.289 0.288 0.291 0.297 0.285 0.275 0.259 Gross/Weapon System Unit Cost ($ in Millions) 0.289 0.332 0.382 0.521 - 0.521 0.532 0.522 0.553 0.481 0.332 0.335 Description: GBU-53 Small Diameter Bomb Increment II (SDB II) Stormbreaker is a United States Air Force (USAF)-led, joint interest ACAT-IC program with the Department of Navy (DoN). SDB II delivers and sustains GBU-53 weapons' capability for the warfighter to attack mobile and stationary targets at standoff and stand in ranges through all weather. SDB II addresses the following warfighter requirements: precision munitions capability, attack moving and stationary targets, adverse weather operations, multiple kills per pass, multiple ordnance carriage, reduced munitions footprint, increased weapons effectiveness, minimized potential for collateral damage, Military-code (M-code) Global Positioning System (GPS) and inertial navigation, reduced susceptibility to anti-jam / anti-spoofing countermeasures, and Network Enabled Weapon (NEW) capabilities via Link-16. SDB II is a key component of Air Force's Global Strike Task Force CONOPS. The threshold aircraft for the USAF is the F-15E and the threshold aircraft for the DoN are the F-35B and F-35C. Funding for integration of threshold aircraft for F-15E, F-35B, and F-35C is in the SDB II program. Because of delays to F-35 integration and test, DoN has funded F/A-18E/F integration and test as a directed objective platform in the SDB II program. Objective aircraft include the F/A-18E/F, F-15EX, F-35A, AC-130, F-16, F-22A, B-1B, B-2, B-52, A-10, and MQ-9. Funding for each objective aircraft is provided by that aircraft program. GBU-53 SDB II is compatible with the BRU-61 and BRU-55 miniature munitions carriages, the CNU-660/E weapon carriage container, the Common Munitions Bit and Reprogramming Equipment (CMBRE), and the Joint Mission Planning System (JMPS). The SDB II produces and fields GBU-53s in single-weapon USAF storage containers or dual-weapon DoN containers. SDB II completed competitive Risk Reduction in October 2009 and entered Milestone B Engineering and Manufacturing Development (EMD) in August 2010. A Fixed Price Incentive Firm (FPIF) EMD contract with five options for annual Low Rate Initial Production (LRIP) lots (FY 2015-FY 2019) was awarded in August 2010. SDB II received Milestone C approval to enter LRIP in June 2015 and completed an Acquisition Program Baseline (APB) update. Contract options for LRIP Lots 1 - 5 have been exercised, and subsequently, sole source SDB II production Lot 6 - 11 contracts have been awarded for additional weapons under LRIP. Initial Operational Test and Evaluation (IOT&E) started June 2018 and completed December 2019. SDB II achieved Initial Operational Capability (IOC) and was fielded for the F-15E in September 2020. AF delcared IOC on F-15E in Seotember 2022. DoN's first production weapons were procured in Lot 4 / FY 2019 to support IOC and fielding on the F/A-18E/F. F/A-18E/F IOT&E was completed in April 2025, and the DON published the Quick Reaction Assessment in July 2025. DoN declared IOC in January 2026. The Milestone Decision Authority approved APB updates in May 2022 and again in May 2025 which incorporated a new IO of 31,800 weapons for the USAF and DoN Inventory Objectives (IO). The program is proceeding to a Full Rate Production (FRP) decision in FY 2027. SDB II total procurement costs in this document only include USAF weapons, weapon containers, trainers, reliability captive/test vehicles, tactical to guided test vehicle (GTV) conversions for Air Combat Command's Weapon System Evaluation Program (WSEP), and SDB II product support. Funds may also be used for non-recurring engineering; All Up Round integration; test, qualification, flight test, and production readiness; Tech Refresh and operational readiness of engineering change proposals (ECP) to resolve safety, reliability, or other operational deficiencies; decrease weapon system cost; increase and preserve future production capabilities and capacities; and meet Congressional, National Agency, and War Department mandates. LI SDB002 - Small Diameter Bomb II Air Force UNCLASSIFIED Page 1 of 21 P-1 Line #20 Volume 1 - 127 === page 158 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: SDB002 / Small Diameter Bomb II Program Elements for Code B Items: 0207327F Other Related Program Elements: 0207327F Line Item MDAP/MAIS Code: 439 Funding may be used for parts obsolescence surveillance and to address Diminishing Manufacturing Sources & Material Shortages (DMSMS) issues to ensure a stable, continuous production line. These types of issues may be addressed through bridge buys, life-of-type buys, supplier/parts replacement, and component and sub-assambly re-qualification. This requirement supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Reference BP20 SDB000 for SDB II FY2015-FY2018. SDB II total procurement costs in this document only include 23,024 USAF weapons, the remaining 1,276 USAF weapons were procured in BP20 SDB000. Funding for this exhibit contained in PE 0207327F. NOTE: FY2025 procured: 1,250 (USAF) plus 250 (DoN) for a total Lot 11 quantity 1,500 AURs. LI SDB002 - Small Diameter Bomb II Air Force UNCLASSIFIED Page 2 of 21 P-1 Line #20 Volume 1 - 128 === page 159 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: SDB002 / Small Diameter Bomb II Program Elements for Code B Items: 0207327F Other Related Program Elements: 0207327F Line Item MDAP/MAIS Code: 439 Exhibits Schedule Exhibit Type Title* P-5 Small Diameter Bomb II P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 B MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 5,279 / 1,527.038 1,228 / 407.222 806 / 307.743 373 / 194.509 - / - 373 / 194.509 5,279 / 1,527.038 1,228 / 407.222 806 / 307.743 373 / 194.509 - / - 373 / 194.509 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 budget request includes funding for SDB II GBU-53 tactical weapons, weapon containers, production tooling and test equipment procurement and sustainment, training equipment required for weapon handling and maintenance, platform integration and flight test and training assets, tactical to GTV conversions for WSEP, support for reliability testing, software maintenance, product support, Tech Refresh for current technologies, hardware upgrades to meet Congressional, National Agency, or War Department mandates, integration and testing of changes to the All Up Round product baseline, and required DMSMS / cost reduction Non-Recurring Engineering (NRE). Training equipment includes Practical Explosive Ordnance Disposal System Trainers (PEST), Weapon Load Crew Trainers (WLCT), and Conventional Maintenance Munitions Trainers (CMMT). FY 2027 funding supports the sole source Lot 13 production contract as the first lot of Full Rate Production (FRP), following a planned 1st quarter FY 2027 FRP Milestone Decision. Lot 13 will be the second procurement lot for GBU-53A/B Configuration 2 SDB II weapons, which includes an M-Code GPS receiver and upgraded forward and aft electronics for exportability and obsolescence refresh. Additional FRP capacity for 2,240 AURs/year maybe available in FY29 for the Lot 13 contract delivery period, following the execution of production test equipment capacity initiative; planned to be awarded in 4QFY26. Lot 13 contract will include both USAF and DoN production quantities. SDB II GBU-53 FY 2027 quantity for the USAF is 373 AURs; FY 2027 quantity for DoN is 512 AURs; total Lot 13 quantities between USAF & DoN is 885 AURs (Buy-To-Budget). Note: Procurement quantities can change based on negotiated options, pricing bands and available funding, in accordance with Title 10, U.S. Code Section 2308 BUY-TO-BUDGET ACQUISITION. Reference BP20 SDB000 for SDB II FY 2015-2018. SDB II total procurement costs in this document only include 23,024 USAF weapons, the remaining 1,276 USAF weapons were procured in BP20 SDB000. LI SDB002 - Small Diameter Bomb II Air Force UNCLASSIFIED Page 3 of 21 P-1 Line #20 Volume 1 - 129 === page 160 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: SDB002 / Small Diameter Bomb II Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: Small Diameter Bomb II MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2026 FY 2027 Total 806 373 - 373 1,527.038 407.222 307.743 194.509 - 194.509 - - 1,527.038 Plus CY Advance Procurement ($ in Millions) - 407.222 - Total Obligation Authority ($ in Millions) FY 2027 OOC 1,228 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2027 Base 5,279 - 1,527.038 - 307.743 - 407.222 - 194.509 - 307.743 - - 194.509 - 194.509 - - 194.509 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 2.298 0.000 - - - - Gross/Weapon System Unit Cost ($ in Millions) 0.289 0.332 0.382 0.521 - 0.521 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Flyaway - Small Diameter Bomb II Cost Recurring Cost SDB Increment II All 0.206 5,279 0.239 1,228 293.602 0.265 806 213.590 0.274 373 102.202 - - - 0.274 373 102.202 Weapon Containers - - Test Vehicle - - 4.451 - - 9.756 - - 7.254 - - 3.357 - - - - - 3.357 - - - 0.498 - - 2.199 - - 2.250 - - - - - - - 2.250 1,090.433 - - 303.856 - - 223.043 - - 107.809 - - - - - 107.809 - - 1,090.433 - - 303.856 - - 223.043 - - 107.809 - - - - - 107.809 Training Equipment Operational Flight Program Updates & Test - - 3.010 - - 0.000 - - 0.000 - - 0.000 - - - - - 0.000 Logistics Support - - 22.346 - - 0.000 - - 0.000 - - 0.000 - - - - - 0.000 - - 2.163 - - 0.061 - - 0.075 - - 0.076 - - - - - 0.076 Production Testing/Lot Integration & Test - - 73.369 - - 22.862 - - 22.858 - - 21.450 - - - - - 21.450 PSC Contractor Services - - 18.743 - - 4.199 - - 4.154 - - 4.252 - - - - - 4.252 PSC Other Government Costs - - 37.605 - - 13.009 - - 9.822 - - 8.358 - - - - - 8.358 Product Support/ Obsolescence - - 279.369 - - 63.235 - - 47.791 - - 52.564 - - - - - 52.564 Subtotal: Support - Small Diameter Bomb II Cost - - 436.605 - - 103.366 - - 84.700 - - 86.700 - - - - - 86.700 (†) Up Round Weapon Subtotal: Recurring Cost Subtotal: Flyaway - Small Diameter Bomb II Cost 1,085.982 Support - Small Diameter Bomb II Cost LI SDB002 - Small Diameter Bomb II Air Force UNCLASSIFIED Page 4 of 21 P-1 Line #20 Volume 1 - 130 === page 161 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: SDB002 / Small Diameter Bomb II Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: Small Diameter Bomb II MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Gross/Weapon System Cost Unit Cost ($ M) 0.289 Qty (Each) 5,279 FY 2025 Total Cost ($ M) 1,527.038 Unit Cost ($ M) 0.332 Qty (Each) FY 2026 Total Cost ($ M) 1,228 407.222 Unit Cost ($ M) 0.382 Qty (Each) 806 FY 2027 Base Total Cost ($ M) 307.743 Unit Cost ($ M) 0.521 Qty (Each) 373 FY 2027 OOC Total Cost ($ M) 194.509 Unit Cost ($ M) - FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) - ($ M) - 0.521 Qty (Each) 373 Total Cost ($ M) 194.509 Remarks: Reference: SDB II AF P-Doc BP20 SDB000 FY2015 to FY2018 for 1,276 USAF weapons & $306.8 Million cost are not in this document. SDB II AF P-Doc BP20 SDB002 FY2019 to FY2042 for 23,024 weapons are referenced in this document. NOTE: FY25 ref incorrect quantity of 1,228 should be 1,250 (Lot 11 USAF buy) Obsolescence funding in support of DMSMS activities to include bridge buys, life-of-type buys, supplier/parts replacement, and re-qualification. Replace and integrate the obsolete seeker components and associated electronics to maintain the SDB II production line. The new seeker design will require ground and flight qualification, updated test equipment, updated computer integrated labs, and production readiness activities. FY26 to FY27 Increase/Decrease: -SDB II AUR Weapon: Decrease due to a 37% decrease between FY26 to FY27 Budget, effecting SDB II quantity to decrease. -SDB II Weapon Containers: Decrease due to a 37% decrease between FY26 to FY27 Budget. -Production Testing: Decrease of $1.408M mainly due to a lesser budget in FY27. -PSC Contractor Services: Slight Increase inflation on the dollar. -PSC Other Government Costs: Decrease of $1.464M factor in the lesser budget in FY27. -Product Support/Obsolescence: Increase due to addtional funds added to budget to cover upcoming FY27 Life Time Buys (LTB) to include a portential to buy more AURs. (†) indicates the presence of a P-5a LI SDB002 - Small Diameter Bomb II Air Force UNCLASSIFIED Page 5 of 21 P-1 Line #20 Volume 1 - 131 === page 162 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements SDB Increment II All Up Round Weapon (†) SDB Increment II All Up Round Weapon (†) SDB Increment II All Up Round Weapon (†) SDB Increment II All Up Round Weapon (†) SDB Increment II All Up Round Weapon (†) SDB Increment II All Up Round Weapon (†) SDB Increment II All Up Round Weapon (†) SDB Increment II All Up Round Weapon (†) SDB Increment II All Up Round Weapon (†) SDB Increment II All Up Round Weapon (†) (†) O O C P-1 Line Item Number / Title: SDB002 / Small Diameter Bomb II Item Number / Title [DODIC]: Small Diameter Bomb II FY Contractor and Location Method/Type or Funding Vehicle 2019 Raytheon / Tucson AZ SS / FFP AFLCMC/PK Eglin AFB, FL Dec 2018 Jun 2021 510 0.120 N Aug 2018 Oct 2009 2020 Raytheon / Tucson AZ SS / FPIF AFLCMC/PK Eglin AFB, FL Oct 2020 Jul 2022 747 0.199 N Aug 2019 Oct 2018 2021 Raytheon / Tucson AZ SS / FPIF AFLCMC/PK Eglin AFB, FL Apr 2021 Jan 2024 674 0.195 N Aug 2020 Oct 2019 2022 Raytheon / Tucson AZ SS / FPIF AFLCMC/PK Eglin AFB, FL Oct 2021 Nov 2024 976 0.193 N Aug 2021 Oct 2020 2023 Raytheon / Tucson AZ SS / FPIF AFLCMC/PK Eglin AFB, FL Mar 2023 Nov 2025 1,122 0.209 N Aug 2022 May 2021 2023 Raytheon / Tucson AZ SS / FPIF AFLCMC/PK Eglin AFB, FL Dec 2023 Nov 2026 481 0.234 N Aug 2023 May 2022 2024 Raytheon / Tucson AZ SS / FPIF AFLCMC/PK Eglin AFB, FL Dec 2023 Nov 2026 769 0.242 N Aug 2023 May 2022 2025 Raytheon / Tucson AZ SS / FPIF AFLCMC/PK Eglin AFB, FL Jan 2025 Nov 2027 1,228 0.239 N Aug 2024 May 2023 2026 Raytheon / Tucson AZ SS / FPIF AFLCMC/PK Eglin AFB, FL Apr 2026 Nov 2028 806 0.265 N Aug 2025 May 2024 2027 Raytheon / Tucson AZ SS / FPIF AFLCMC/PK Eglin AFB, FL Mar 2027 Nov 2029 373 0.274 N Aug 2026 Location of PCO Award Date Date of First Delivery Qty (Each) Specs Date Unit Cost Avail Revision Now? Available ($ M) RFP Issue Date indicates the presence of a P-21 Remarks: *SDB II Lots 1-5 are options on the current EMD contract with Raytheon Missile Systems, Tucson, AZ, which was competitively awarded in August 2010. SDB II specifications for Lot 1-5 are defined in the EMD contract. *SDB II Lots 4-5 (FY2018-FY2019) are Firm Fixed Price contracts. *SDB II Lot 6 (FY2020) awarded as FPIF contract. *SDB II Lot 7 (FY2021) awarded as FPIF contract. *SDB II Lot 8 (FY2022) awarded as FPIF contract. *SDB II Lot 9 (FY2023) awarded as FPIF contract. *SDB II Lot 10 (FY2024) awarded as FPIF contract. *SDB II Lot 11 (FY2025) awarded as FPIF contract. *SDB II Lot 12 (FY2026) to be negotiated as a FPIF contract. *SDB II Lot 13 (FY2027) to be negotiated as a FPIF Contract. *SDB II unit cost increased from Lot 5 (FY 2019) to Lot 6 (FY 2020) due to the end of the competitive business deal for Lots 1-5. Lot 6 was the first sole source lot and was negotiated using actual cost data available from prior lots. LI SDB002 - Small Diameter Bomb II Air Force UNCLASSIFIED Page 6 of 21 P-1 Line #20 Volume 1 - 132 === page 163 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: SDB002 / Small Diameter Bomb II Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Small Diameter Bomb II Fiscal Year 2019 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2018 1 OCT Calendar Year 2019 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2020 M A Y J U N J U L Calendar Year 2020 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P SDB Increment II All Up Round Weapon (1) 1 2019 AF 1 2019 NAVY 1 2019 Total 1 2020 AF 1 2020 NAVY 1 2020 FMS 1 2020 Total 1 2021 AF 1 2021 (‡) (2) (3) (‡) (4) (‡) (5) (6) NAVY (‡) (7) (‡) (8) 1 2021 FMS 1 2021 Total 1 2022 AF 1 2022 NAVY 1 2022 Total 1 2023 AF 1 2023 NAVY 1 2023 AF 1 2023 NAVY 1 2023 Total 1 2024 AF 1 2024 NAVY 1 2024 Total 1 2025 AF 1 2025 NAVY 1 2025 Total 1 2026 AF 1 2026 NAVY 1 2026 1 2027 510 0 510 A - - - - - - - - - - - - - - - - - - - - - - 750 0 750 A - - - - - - - - - - - - - - - - - - - - - - 510 750 1,260 0 1,260 - - - - - - - - - - - - - - - - - - - - - - 1,260 747 0 747 747 461 0 461 461 20 0 20 20 1,228 0 1,228 1,228 674 0 674 674 226 0 226 226 200 0 200 200 1,100 0 1,100 1,100 976 0 976 976 164 0 164 164 1,140 0 1,140 1,140 1,122 0 1,122 1,122 378 0 378 378 481 0 481 481 378 0 378 378 1,500 0 1,500 1,500 769 0 769 769 232 0 232 232 1,001 0 1,001 1,001 1,228 0 1,228 1,228 262 0 262 262 1,490 0 1,490 1,490 806 0 806 806 245 0 245 245 Total 1,051 0 1,051 1,051 AF 373 0 373 (‡) (‡) (‡) (‡) (‡) (‡) 373 O C T LI SDB002 - Small Diameter Bomb II Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 21 S E P O C T N O V D E C J A N F E B P-1 Line #20 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 133 === page 164 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: SDB002 / Small Diameter Bomb II Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1 2027 NAVY 1 2027 Total (‡) PROC QTY Item Number / Title [DODIC]: Small Diameter Bomb II Fiscal Year 2019 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2018 1 OCT 512 0 512 885 0 885 Calendar Year 2019 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2020 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 512 885 O C T LI SDB002 - Small Diameter Bomb II Air Force Fiscal Year 2020 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 21 S E P O C T N O V D E C J A N F E B P-1 Line #20 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 134 === page 165 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: SDB002 / Small Diameter Bomb II Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Small Diameter Bomb II Fiscal Year 2021 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT Calendar Year 2021 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2022 M A Y J U N J U L Calendar Year 2022 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P SDB Increment II All Up Round Weapon (1) 1 2019 AF 1 2019 NAVY 510 0 510 - - - - - - - - 510 750 0 750 - - - - - - - - 750 1 2019 Total 1,260 0 1,260 - - - - - - - - 1,260 - - - - - - - - - - - - - 1 2020 AF (3) 747 0 747 A - - - - - - - - - - - - - - - - - - - - - 747 1 2020 NAVY 0 461 0 461 A - - - - - - - - - - - - - - - - - - - - - 461 1 2020 FMS 0 20 0 20 A - - - - - - - - - - - - - - - - - - - - - 20 1 2020 Total 1,228 0 1,228 - - - - - - - - - - - - - - - - - - - - - 1,228 - - 1 2021 AF 0 (6) 674 0 674 A - - - - - - - - - - - - - - - - - - 674 1 2021 NAVY 226 0 226 A - - - - - - - - - - - - - - - - - - 226 (‡) (2) (‡) (4) (‡) (5) (‡) (7) (‡) (8) 1 2021 FMS 1 2021 Total 1 2022 AF 1 2022 NAVY 1 2022 Total 1 2023 AF 1 2023 NAVY 1 2023 AF 1 2023 NAVY 1 2023 Total 1 2024 AF 1 2024 NAVY 1 2024 Total 1 2025 AF 1 2025 NAVY 1 2025 Total 1 2026 AF 1 2026 NAVY 1 2026 1 2027 0 0 - - 0 0 200 0 200 A - - - - - - - - - - - - - - - - - - 200 1,100 0 1,100 - - - - - - - - - - - - - - - - - - 1,100 976 0 976 A - - - - - - - - - - - - 976 164 0 164 A - - - - - - - - - - - - 164 1,140 0 1,140 - - - - - - - - - - - - 1,140 1,122 0 1,122 1,122 378 0 378 378 481 0 481 481 378 0 378 378 1,500 0 1,500 1,500 769 0 769 769 232 0 232 232 1,001 0 1,001 1,001 1,228 0 1,228 1,228 262 0 262 262 1,490 0 1,490 1,490 806 0 806 806 245 0 245 245 Total 1,051 0 1,051 1,051 AF 373 0 373 (‡) (‡) (‡) (‡) (‡) (‡) 373 O C T LI SDB002 - Small Diameter Bomb II Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 21 S E P O C T N O V D E C J A N F E B P-1 Line #20 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 135 === page 166 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: SDB002 / Small Diameter Bomb II Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1 2027 NAVY 1 2027 Total (‡) PROC QTY Item Number / Title [DODIC]: Small Diameter Bomb II Fiscal Year 2021 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT 512 0 512 885 0 885 Calendar Year 2021 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2022 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 512 885 O C T LI SDB002 - Small Diameter Bomb II Air Force Fiscal Year 2022 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 21 S E P O C T N O V D E C J A N F E B P-1 Line #20 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 136 === page 167 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: SDB002 / Small Diameter Bomb II Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Small Diameter Bomb II Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P SDB Increment II All Up Round Weapon (1) 1 2019 AF 1 2019 NAVY 510 510 0 750 750 0 1 2019 Total 1,260 1,260 0 1 2020 AF (3) 747 747 0 1 2020 NAVY 0 461 461 0 1 2020 FMS 0 20 20 0 1 2020 Total 1,228 1,228 0 - - - - - - - - - - - - - - - - - - - - - - - - 1 2021 AF 0 (6) 674 0 674 - - - - - - - - - - - - - - - 606 - - - - - - - - 68 1 2021 NAVY 226 0 226 - - - - - - - - - - - - - - - 203 - - - - - - - - 23 (‡) (2) (‡) (4) (‡) (5) (‡) (7) (‡) (8) 1 2021 FMS 1 2021 Total 1 2022 AF 1 2022 NAVY 1 2022 Total 1 2023 AF 1 2023 NAVY 1 2023 AF 1 2023 NAVY 1 2023 Total 1 2024 AF 1 2024 NAVY 1 2024 Total 1 2025 AF 1 2025 NAVY 1 2025 Total 1 2026 AF 1 2026 NAVY 1 2026 1 2027 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 200 0 200 - - - - - - - - - - - - - - - 180 - - - - - - - - 20 1,100 0 1,100 - - - - - - - - - - - - - - - 989 - - - - - - - - 111 976 0 976 - - - - - - - - - - - - - - - - - - - - - - - - 976 164 0 164 - - - - - - - - - - - - - - - - - - - - - - - - 164 1,140 0 1,140 - - - - - - - - - - - - - - - - - - - - - - - - 1,140 1,122 0 1,122 A - - - - - - - - - - - - - - - - - - - 1,122 378 0 378 A - - - - - - - - - - - - - - - - - - - 378 481 0 481 A - - - - - - - - - - 481 378 0 378 A - - - - - - - - - - 378 1,500 0 1,500 - - - - - - - - - - 1,500 769 0 769 A - - - - - - - - - - 769 232 0 232 A - - - - - - - - - - 232 1,001 0 1,001 - - - - - - - - - - 1,001 1,228 0 1,228 262 0 262 262 1,490 0 1,490 1,490 806 0 806 806 245 0 245 245 Total 1,051 0 1,051 1,051 AF 373 0 373 (‡) (‡) (‡) (‡) (‡) (‡) - - - - - - - - 1,228 373 O C T LI SDB002 - Small Diameter Bomb II Air Force - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 21 S E P O C T N O V D E C J A N F E B P-1 Line #20 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 137 === page 168 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: SDB002 / Small Diameter Bomb II Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1 2027 NAVY 1 2027 Total (‡) PROC QTY Item Number / Title [DODIC]: Small Diameter Bomb II Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT 512 0 512 885 0 885 Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 512 885 O C T LI SDB002 - Small Diameter Bomb II Air Force Fiscal Year 2024 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 21 S E P O C T N O V D E C J A N F E B P-1 Line #20 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 138 === page 169 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: SDB002 / Small Diameter Bomb II Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Small Diameter Bomb II Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P SDB Increment II All Up Round Weapon (1) 1 2019 AF 1 2019 NAVY 510 510 0 750 750 0 1 2019 Total 1,260 1,260 0 1 2020 AF (3) 747 747 0 1 2020 NAVY 0 461 461 0 1 2020 FMS 0 20 20 0 1 2020 Total 1,228 1,228 0 - 1 2021 AF (6) 674 606 68 68 1 2021 0 226 203 23 23 0 (‡) (2) (‡) (4) (‡) (5) NAVY (‡) (7) (‡) (8) 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 - - - - - - - - - - - - - - - - - - - - - - - 0 1 2021 FMS 200 180 20 20 1 2021 Total 1,100 989 111 111 - - - - - - - - - - - - 1 2022 AF 976 0 976 - 81 81 81 81 81 81 81 81 82 82 82 82 1 2022 NAVY 164 0 164 - 13 13 13 13 14 14 14 14 14 14 14 14 1 2022 Total 1,140 0 1,140 - 94 94 94 94 95 95 95 95 96 96 96 96 - - - - - - - - - - - 0 1 2023 AF 1,122 0 1,122 - - - - - - - - - - - - - 94 94 94 94 94 94 93 93 93 93 93 93 1 2023 NAVY 378 0 378 - - - - - - - - - - - - - - - - - - - - - - - - 378 1 2023 AF 481 0 481 - - - - - - - - - - - - - - - - - - - - - - - - 481 1 2023 NAVY 378 0 378 - - - - - - - - - - - - - - - - - - - - - - - - 378 1 2023 Total 1,500 0 1,500 - - - - - - - - - - - - - 94 94 94 94 94 94 93 93 93 93 93 471 1 2024 AF 769 0 769 - - - - - - - - - - - - - - - - - - - - - - - - 769 1 2024 NAVY 232 0 232 - - - - - - - - - - - - - - - - - - - - - - - - 232 1 2024 Total 1,001 0 1,001 - - - - - - - - - - - - - - - - - - - - - - - - 1,001 1 2025 AF 1,228 0 1,228 A - - - - - - - - - - - - - - - - - - - - - 1,228 1 2025 NAVY 262 0 262 A - - - - - - - - - - - - - - - - - - - - - 262 1 2025 Total 1,490 0 1,490 - - - - - - - - - - - - - - - - - - - - - 1,490 1 2026 AF 806 0 806 A - - - - - - 806 1 2026 NAVY 245 0 245 A - - - - - - 245 1 2026 Total 1,051 0 1,051 - - - - - - 1,051 1 2027 AF 373 0 373 (‡) (‡) (‡) (‡) (‡) (‡) - - - - - - - - - - 0 0 0 373 O C T LI SDB002 - Small Diameter Bomb II Air Force 0 - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 13 of 21 S E P O C T N O V D E C J A N F E B P-1 Line #20 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 139 === page 170 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: SDB002 / Small Diameter Bomb II Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1 2027 NAVY 1 2027 Total (‡) PROC QTY Item Number / Title [DODIC]: Small Diameter Bomb II Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT 512 0 512 885 0 885 Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E 512 885 O C T LI SDB002 - Small Diameter Bomb II Air Force Fiscal Year 2026 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 14 of 21 S E P O C T N O V D E C J A N F E B P-1 Line #20 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 140 === page 171 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: SDB002 / Small Diameter Bomb II Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Small Diameter Bomb II Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P SDB Increment II All Up Round Weapon (1) 1 2019 AF 1 2019 NAVY 510 510 0 750 750 0 1 2019 Total 1,260 1,260 0 1 2020 AF (3) 747 747 0 1 2020 NAVY 0 461 461 0 1 2020 FMS 0 20 20 0 1 2020 Total 1,228 1,228 0 1 2021 AF (6) 674 674 0 1 2021 0 226 226 0 0 (‡) (2) (‡) (4) (‡) (5) NAVY (‡) (7) (‡) (8) 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 1 2021 FMS 200 200 0 1 2021 Total 1,100 1,100 0 1 2022 AF 976 976 0 1 2022 NAVY 164 164 0 1 2022 Total 1,140 1,140 0 - - - - - - - - - - - - - 1 2023 AF 1,122 1,029 93 93 - - - - - - - - - - - - 1 2023 NAVY 378 0 378 - 2 2 2 2 2 2 1 1 1 1 1 1 1 2023 AF 481 0 481 - 41 40 40 40 40 40 40 40 40 40 40 40 0 1 2023 NAVY 378 0 378 - 2 2 2 2 2 2 1 1 1 1 1 1 360 1 2023 Total 1,500 1,029 471 93 2 2 2 2 2 2 1 1 1 1 1 1 1 2024 AF 769 0 769 - 64 64 64 64 64 64 64 64 64 64 64 65 1 2024 NAVY 232 0 232 - 19 19 19 19 19 19 19 19 20 20 20 20 1 2024 Total 1,001 0 1,001 - 83 83 83 83 83 83 83 83 84 84 84 85 - - - - - - - - - - - 0 1 2025 AF 1,228 0 1,228 - - - - - - - - - - - - - 102 102 102 102 102 102 102 102 103 103 103 103 1 2025 NAVY 1 2025 Total 1 2026 AF 1 2026 NAVY 1 2026 1 2027 (‡) (‡) (‡) (‡) (‡) 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 - - - - - - - - - - - 0 0 360 - - - - - - - - - - - 360 0 0 262 0 262 - - - - - - - - - - - - - 23 23 23 23 23 23 23 23 22 22 22 12 1,490 0 1,490 - - - - - - - - - - - - - 125 125 125 125 125 125 125 125 125 125 125 115 806 0 806 - - - - - - - - - - - - - - - - - - - - - - - - 806 245 0 245 - - - - - - - - - - - - - - - - - - - - - - - - 245 Total 1,051 0 1,051 - - - - - - - - - - - - - - - - - - - - - - - - 1,051 AF 373 0 373 - 373 (‡) A O C T LI SDB002 - Small Diameter Bomb II Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 15 of 21 S E P O C T N O V D E C J A N F E B P-1 Line #20 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 141 === page 172 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: SDB002 / Small Diameter Bomb II Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1 2027 NAVY 1 2027 Total (‡) PROC QTY Item Number / Title [DODIC]: Small Diameter Bomb II Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 512 0 512 A - - - - - - - - - - - - - - - - - - - 512 885 0 885 - - - - - - - - - - - - - - - - - - - 885 O C T LI SDB002 - Small Diameter Bomb II Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 16 of 21 S E P O C T N O V D E C J A N F E B P-1 Line #20 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 142 === page 173 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: SDB002 / Small Diameter Bomb II Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Small Diameter Bomb II Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P SDB Increment II All Up Round Weapon (1) 1 2019 AF 1 2019 NAVY 510 510 0 750 750 0 1 2019 Total 1,260 1,260 0 1 2020 AF (3) 747 747 0 1 2020 NAVY 0 461 461 0 1 2020 FMS 0 20 20 0 1 2020 Total 1,228 1,228 0 1 2021 AF (6) 674 674 0 1 2021 0 226 226 0 0 (‡) (2) (‡) (4) (‡) (5) NAVY (‡) (7) (‡) (8) 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 1 2021 FMS 200 200 0 1 2021 Total 1,100 1,100 0 1 2022 AF 976 976 0 1 2022 NAVY 164 164 0 1 2022 Total 1,140 1,140 0 1 2023 AF 1,122 1,122 0 0 1 2023 NAVY 378 18 360 360 1 2023 AF 481 481 0 0 1 2023 NAVY 378 18 360 360 1 2023 Total 1,500 1,140 360 1 2024 AF 769 769 0 1 2024 NAVY 232 232 0 1 2024 Total 1,001 1,001 0 - 1 2025 AF 1,228 1,125 103 103 1 2025 NAVY 262 250 12 12 1 2025 Total 1,490 1,375 115 115 - - - - - - - - - - - - 1 2026 AF 806 0 806 - 67 67 67 67 67 67 67 67 67 67 68 68 1 2026 NAVY 245 0 245 - 20 20 20 20 20 20 20 20 20 20 20 25 1 2026 Total 1,051 0 1,051 - 87 87 87 87 87 87 87 87 87 87 88 93 - - - - - - - - - - - 0 1 2027 AF 373 0 373 - - - - - - - - - - - - - 31 31 31 31 31 31 31 31 31 31 31 32 (‡) (‡) (‡) (‡) (‡) (‡) 0 - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0 360 0 0 O C T LI SDB002 - Small Diameter Bomb II Air Force - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 17 of 21 S E P O C T - - - - - - - - - - - 0 0 0 N O V D E C J A N F E B P-1 Line #20 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 143 === page 174 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: SDB002 / Small Diameter Bomb II Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1 2027 NAVY 1 2027 Total (‡) PROC QTY Item Number / Title [DODIC]: Small Diameter Bomb II Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2030 M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 512 0 512 - - - - - - - - - - - - - 43 43 43 43 43 43 43 43 43 43 41 41 885 0 885 - - - - - - - - - - - - - 74 74 74 74 74 74 74 74 74 74 72 73 O C T LI SDB002 - Small Diameter Bomb II Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 18 of 21 S E P O C T N O V D E C J A N F E B P-1 Line #20 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 144 === page 175 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: SDB002 / Small Diameter Bomb II Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Small Diameter Bomb II Fiscal Year 2031 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2030 1 OCT Calendar Year 2031 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2032 M A Y J U N J U L Calendar Year 2032 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P SDB Increment II All Up Round Weapon (1) 1 2019 AF 1 2019 NAVY 510 510 0 750 750 0 1 2019 Total 1,260 1,260 0 1 2020 AF (3) 747 747 0 1 2020 NAVY 0 461 461 0 1 2020 FMS 0 20 20 0 1 2020 Total 1,228 1,228 0 1 2021 AF (6) 674 674 0 1 2021 0 226 226 0 0 (‡) (2) (‡) (4) (‡) (5) NAVY (‡) (7) (‡) (8) 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 1 2021 FMS 200 200 0 1 2021 Total 1,100 1,100 0 1 2022 AF 976 976 0 1 2022 NAVY 164 164 0 1 2022 Total 1,140 1,140 0 1 2023 AF 1,122 1,122 0 0 1 2023 NAVY 378 18 360 360 1 2023 AF 481 481 0 0 1 2023 NAVY 378 18 360 360 1 2023 Total 1,500 1,140 360 1 2024 AF 769 769 0 1 2024 NAVY 232 232 0 1 2024 Total 1,001 1,001 0 1 2025 AF 1,228 1,228 0 1 2025 NAVY 262 262 0 1 2025 Total 1,490 1,490 0 1 2026 AF 806 806 0 1 2026 NAVY 245 245 0 1 2026 Total 1,051 1,051 0 - 1 2027 AF 373 341 32 32 (‡) (‡) (‡) (‡) (‡) (‡) 0 - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0 360 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 - - - - - - - - - - - - - - - - - - - - - - - - 0 0 0 O C T LI SDB002 - Small Diameter Bomb II Air Force - - - - - - - - - - - - - - - - - - - - - - - - 0 0 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 19 of 21 S E P O C T N O V D E C J A N F E B P-1 Line #20 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 145 === page 176 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: SDB002 / Small Diameter Bomb II Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE 1 2027 NAVY 1 2027 Total (‡) PROC QTY Item Number / Title [DODIC]: Small Diameter Bomb II Fiscal Year 2031 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2030 1 OCT Calendar Year 2031 O C T N O V 512 471 41 41 885 812 73 73 O C T LI SDB002 - Small Diameter Bomb II Air Force D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2032 M A Y J U N J U L Calendar Year 2032 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P 0 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 20 of 21 S E P O C T N O V D E C J A N F E B P-1 Line #20 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 146 0 === page 177 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: SDB002 / Small Diameter Bomb II Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Item Number / Title [DODIC]: Small Diameter Bomb II Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Raytheon - Tucson AZ 1,140 1,925 2,100 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 1 Manufacturing PLT 6 Total After Oct 1 32 38 Remarks: 1. FY2025 USAF quantities reflected 1,228 is incorrect Lot 11 purchased 1,250 and the Navy procured 250 for a total of 1,500 units. 2. P-21 monthly delivery schedules do not reflect contractual agreements for Lots 1-6, which are based on quarterly AUR deliveries. Monthly delivery schedules began with the Lot 7 production contract. NOTE: Schedule has been updated to reflect quantity buys on limited budget profile for FY26-FY31, quantities referenced in this P-40 will not meet MSR with USAF and DoN quantities. (‡) Delivery rows marked with this symbol indicate that they are funded through a separate Line Item. See the respective components' exhibits for details, including the full delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (1) (2) (3) (4) (5) (6) (7) (8) Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. LI SDB002 - Small Diameter Bomb II Air Force UNCLASSIFIED Page 21 of 21 P-1 Line #20 Volume 1 - 147 === page 178 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 148 === page 179 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: SIAW24 / Stand-In Attack Weapon (SIAW) Program Elements for Code B Items: 0207328F Other Related Program Elements: 0207328F Line Item MDAP/MAIS Code: 439 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 56 119.922 119.922 119.922 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - 75 155 - 155 216 189 221 221 2,500 3,633 152.646 401.607 - 401.607 735.716 585.409 775.016 869.698 7,387.437 11,180.097 152.646 152.646 152.646 152.646 152.646 - - 401.607 - - 401.607 - 401.607 401.607 735.716 735.716 585.409 585.409 775.016 775.016 To FY 2031 Complete 869.698 869.698 Total 0.000 0.000 7,387.437 11,180.097 7,387.437 11,180.097 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) 1.639 - 1.792 1.850 - 1.850 2.315 2.594 2.560 3.019 2.557 2.554 Gross/Weapon System Unit Cost ($ in Millions) 2.141 - 2.035 2.591 - 2.591 3.406 3.097 3.507 3.935 2.955 3.077 Description: The Stand-in Attack Weapon (SiAW) is currently in development under the Middle Tier of Acquisition (MTA) pathway and is posturing for transition to the Major Capability Acquisition (MCA) pathway for production in FY2027. SiAW will provide capability to strike rapidly re-locatable targets that create the Anti-Access/Area Denial (A2/AD) environment for 5th Generation and Future Advanced Aircraft. SiAW targets include Theater Ballistic Missile Launchers, Land Attack and Anti-Ship Cruise Missile Launchers, Jammers, Anti-Satellite Systems, and Integrated Air Defense Systems. The SiAW missile system emphasizes agility and innovation by leveraging Digital Engineering (DE) and Weapon Open System Architecture (WOSA) approaches to quickly integrate future capabilities at reduced cost. Interim capability will be pursued through the Navy's Advanced Anti-Radiation Guided Missile-Extended Range (AARGM-ER) program with improved warhead/fuze and F-35 integration (including Universal Armament Interface [UAI] and Mission Planning). FY2027 funding increased to support procurement of SiAW quantities. The FY2027 weapon system cost (WSC) total quantity was not corrected prior to final database lock. The correct FY2027 total quantity is 78. FY2027 funding will procure 20 AARGM-ER AUR missiles, 58 SiAW AUR missiles, and associated support costs. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. Funding for this exhibit contained in PE 0207328F. Navy procurement of AARGM-ER is in PE 0204162N/0206138M. This requirement supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. LI SIAW24 - Stand-In Attack Weapon (SIAW) Air Force UNCLASSIFIED Page 1 of 11 P-1 Line #21 Volume 1 - 149 === page 180 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 2: Tactical ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: SIAW24 / Stand-In Attack Weapon (SIAW) Program Elements for Code B Items: 0207328F Other Related Program Elements: 0207328F Line Item MDAP/MAIS Code: 439 Exhibits Schedule Exhibit Type Title* P-5 Stand-In Attack Weapon (SIAW) P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 B MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 56 / 119.922 - / 152.646 75 / 152.646 155 / 401.607 - / - 155 / 401.607 56 / 119.922 - / 152.646 75 / 152.646 155 / 401.607 - / - 155 / 401.607 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY2027 funding increased to support procurement of SiAW quantities. The FY2027 WSC total quantity was not corrected prior to final database lock. The correct FY2027 total quantity is 78. FY2027 funding will procure 20 AARGM-ER AUR missiles, 58 SiAW AUR missiles, and associated support costs. AARGM-ER unit price provided by USN as lead AARGM-ER program office. Note: Procurement quantities can change based on negotiated options/pricing bands and available funding, in accordance with Title 10, U.S. Code Section 3069 BUY-TO-BUDGET ACQUISITION. LI SIAW24 - Stand-In Attack Weapon (SIAW) Air Force UNCLASSIFIED Page 2 of 11 P-1 Line #21 Volume 1 - 150 === page 181 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: SIAW24 / Stand-In Attack Weapon (SIAW) Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: Stand-In Attack Weapon (SIAW) MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 FY 2026 56 Gross/Weapon System Cost ($ in Millions) 119.922 Less PY Advance Procurement ($ in Millions) 152.646 - Net Procurement (P-1) ($ in Millions) - Total Obligation Authority ($ in Millions) - 155 152.646 401.607 - 401.607 - 152.646 - 119.922 - 401.607 - 152.646 FY 2027 Total 155 - 152.646 FY 2027 OOC 75 - 119.922 Plus CY Advance Procurement ($ in Millions) FY 2027 Base - - 152.646 - - 401.607 - - 401.607 - 401.607 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) - - - 0.000 - 0.000 2.141 - 2.035 2.591 - 2.591 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Flyaway - Stand-in Attack Weapon Cost Recurring Cost All Up Round - 1.614 56 90.365 - - 144.979 1.524 75 114.300 2.230 20 44.600 - - - 2.230 20 44.600 - - - - - 0.000 - - 0.000 3.787 58 219.649 - - - 3.787 58 219.649 Containers - - 1.437 - - 4.304 - - 1.354 - - 2.306 - - - - - 2.306 Engineering Change Orders - - - - - 0.000 - - 0.000 - - 14.600 - - - - - 14.600 All Up Round Classified - - 0.000 - - - - - 18.750 - - 5.667 - - - - - 5.667 Subtotal: Recurring Cost - - 91.802 - - 149.283 - - 134.404 - - 286.822 - - - - - 286.822 Subtotal: Flyaway - Stand-in Attack Weapon Cost - - 91.802 - - 149.283 - - 134.404 - - 286.822 - - - - - 286.822 (†) AARGM ER All Up Round (†) SiAW Support - Stand-In Attack Weapon (SIAW) Cost Program Support Costs Contractor Services - - 0.375 - - 0.000 - - 0.872 - - 9.954 - - - - - 9.954 Obsolescence - - 5.015 - - 0.000 - - 11.672 - - 6.085 - - - - - 6.085 Program Support Costs Other Government Costs - - 0.057 - - 0.107 - - 0.000 - - 7.254 - - - - - 7.254 Production Support Equipment - - 22.673 - - 3.256 - - 5.698 - - 91.492 - - - - - 91.492 Subtotal: Support - Stand-In Attack Weapon (SIAW) Cost - - 28.120 - - 3.363 - - 18.242 - - 114.785 - - - - - 114.785 LI SIAW24 - Stand-In Attack Weapon (SIAW) Air Force UNCLASSIFIED Page 3 of 11 P-1 Line #21 Volume 1 - 151 === page 182 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: SIAW24 / Stand-In Attack Weapon (SIAW) Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: Stand-In Attack Weapon (SIAW) MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Gross/Weapon System Cost Unit Cost ($ M) 2.141 FY 2025 Total Cost Qty (Each) ($ M) 56 Unit Cost 119.922 ($ M) - FY 2026 Total Cost Qty (Each) ($ M) - 152.646 Unit Cost ($ M) Qty (Each) 2.035 FY 2027 Base Total Cost ($ M) 75 152.646 Unit Cost ($ M) 2.591 Qty (Each) 155 FY 2027 OOC Total Cost ($ M) 401.607 Unit Cost ($ M) - FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) - ($ M) - 2.591 Qty (Each) 155 Total Cost ($ M) 401.607 Remarks: FY2024 was rescinded $41.189 million and is not reflected in this budget documentation. FY2025 was rescinded $152.646 million and is not reflected in this budget documentation. FY2027-FY2031 funding and quantities increased to account for SiAW production beginning in FY2027. (†) indicates the presence of a P-5a LI SIAW24 - Stand-In Attack Weapon (SIAW) Air Force UNCLASSIFIED Page 4 of 11 P-1 Line #21 Volume 1 - 152 === page 183 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 O O C Item Number / Title [DODIC]: Stand-In Attack Weapon (SIAW) FY Contractor and Location Method/Type or Funding Vehicle (†) 2023 Northrop Grumman / Northridge, CA MIPR NAVAIR (†) 2024 Northrop Grumman / Northridge, CA MIPR NAVAIR Jul 2025 Aug 2028 14 1.669 N Sep 2023 Sep 2023 (†) 2026 Northrop Grumman / Northridge, CA MIPR NAVAIR Jun 2026 Nov 2029 75 1.524 N Sep 2024 Apr 2024 (†) 2027 Northrop Grumman / Northridge, CA MIPR NAVAIR Mar 2027 Nov 2030 20 2.230 N Sep 2026 Sep 2026 2027 Northrop Grumman / Northridge, CA TBD AFLCMC/EB - Weapons Sep 2027 Sep 2030 58 3.787 N Aug 2026 Oct 2026 Cost Elements All Up Round - AARGM ER All Up Round - AARGM ER All Up Round - AARGM ER All Up Round - AARGM ER (†) All Up Round - SiAW (†) P-1 Line Item Number / Title: SIAW24 / Stand-In Attack Weapon (SIAW) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Nov 2023 Nov 2027 42 1.799 N Apr 2022 Apr 2022 Qty (Each) RFP Issue Date indicates the presence of a P-21 LI SIAW24 - Stand-In Attack Weapon (SIAW) Air Force UNCLASSIFIED Page 5 of 11 P-1 Line #21 Volume 1 - 153 === page 184 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: SIAW24 / Stand-In Attack Weapon (SIAW) Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Stand-In Attack Weapon (SIAW) Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P All Up Round - AARGM ER 1 2023 AF 42 0 42 1 2024 AF 14 0 14 A - - - - - - - - - - - - - - - - - - - - - - - 42 A - - - 1 2026 AF 75 0 75 14 75 1 2027 AF 20 0 20 20 58 0 58 All Up Round - SiAW 2 2027 AF 58 O C T N O V LI SIAW24 - Stand-In Attack Weapon (SIAW) Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #21 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 154 === page 185 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: SIAW24 / Stand-In Attack Weapon (SIAW) Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Stand-In Attack Weapon (SIAW) Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P All Up Round - AARGM ER 1 2023 AF 42 0 42 - - - - - - - - - - - - - - - - - - - - - - - - 42 1 2024 AF 14 0 14 - - - - - - - - - - - - - - - - - - - - - - - - 14 1 2026 AF 75 0 75 A - - - - - - - - - - - - - - - - 75 1 2027 AF 20 0 20 A - - - - - - - 20 58 0 58 A - 58 All Up Round - SiAW 2 2027 AF O C T N O V LI SIAW24 - Stand-In Attack Weapon (SIAW) Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #21 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 155 === page 186 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: SIAW24 / Stand-In Attack Weapon (SIAW) Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Stand-In Attack Weapon (SIAW) Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P All Up Round - AARGM ER 1 2023 AF 42 0 42 - 12 12 10 1 2024 AF 14 0 14 - - - - - 8 - - - - - 0 1 2026 AF 75 0 75 - - - - - - - - - - - - - - - - - - - - - - - - 75 1 2027 AF 20 0 20 - - - - - - - - - - - - - - - - - - - - - - - - 20 58 0 58 - 58 7 7 0 All Up Round - SiAW 2 2027 AF O C T N O V LI SIAW24 - Stand-In Attack Weapon (SIAW) Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #21 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 156 === page 187 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: SIAW24 / Stand-In Attack Weapon (SIAW) Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Stand-In Attack Weapon (SIAW) Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2031 M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P All Up Round - AARGM ER 1 2023 AF 42 42 0 1 2024 AF 14 14 0 0 1 2026 AF 75 0 75 - 1 2027 AF 20 0 20 - 58 0 58 0 7 6 - 6 - 6 - 6 - 6 - 6 - 6 - 6 - 6 - 7 - 7 - 0 - 1 2 2 2 2 2 2 2 1 1 1 2 All Up Round - SiAW 2 2027 AF O C T N O V LI SIAW24 - Stand-In Attack Weapon (SIAW) Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 11 5 S E P 5 O C T 5 N O V 4 D E C 4 J A N 5 F E B P-1 Line #21 5 M A R 5 A P R 5 M A Y 5 J U N 5 J U L 5 A U G 0 S E P Volume 1 - 157 === page 188 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: SIAW24 / Stand-In Attack Weapon (SIAW) Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Stand-In Attack Weapon (SIAW) Fiscal Year 2032 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2031 1 OCT Fiscal Year 2033 Calendar Year 2032 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2033 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E All Up Round - AARGM ER 1 2023 AF 42 42 0 0 1 2024 AF 14 14 0 0 1 2026 AF 75 75 0 1 2027 AF 20 18 2 58 58 0 0 2 0 All Up Round - SiAW 2 2027 AF 0 O C T N O V LI SIAW24 - Stand-In Attack Weapon (SIAW) Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 11 S E P O C T N O V D E C J A N F E B P-1 Line #21 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 158 === page 189 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: SIAW24 / Stand-In Attack Weapon (SIAW) Appropriation / Budget Activity / Budget Sub Activity: 3020F / 02 / 2 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: Stand-In Attack Weapon (SIAW) Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Northrop Grumman Northridge, CA 60 300 316 0 0 0 0 0 6 44 50 2 Northrop Grumman Northridge, CA 60 300 316 0 12 36 48 0 0 0 0 Remarks: Minimum Sustainment Rate is based on combined production of Navy/Air Force AARGM-ER and SiAW assets. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI SIAW24 - Stand-In Attack Weapon (SIAW) Air Force UNCLASSIFIED Page 11 of 11 P-1 Line #21 Volume 1 - 159 === page 190 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 160 === page 191 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 02: Other Missiles / BSA 5: Industrial Facilities ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: 000042 / Industrial Preparedness/Pol Prevention Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 0.913 0.917 0.931 - 0.931 0.954 0.974 0.994 1.013 - 6.696 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 0.913 0.917 0.931 - 0.931 0.954 0.974 0.994 1.013 - 6.696 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 0.913 0.917 0.931 - 0.931 0.954 0.974 0.994 1.013 - 6.696 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The Air Force Industrial Preparedness program element combines the resources of several appropriations (Aircraft Procurement, Missile Procurement, and Operation and Maintenance) which includes capital type rehabilitation (MPC 3000), industrial base concerns (MPC 6000), pollution prevention (MPC 6044), and environmental compliance (MPC 7000) to create a comprehensive program that aids in ensuring the defense industry can supply reliable, safe, affordable systems to operational commanders. The Air Force Industrial Preparedness program element Missile Procurement appropriation, MPC 7000 (environmental compliance) ensures the defense industry can supply reliable, safe, affordable systems to operational commanders through management and upkeep of Air Force Plant 44, Tucson, AZ. Funds are used to: 1) manage industrial plant assets via repair, minor construction, demolition, property appraisals, and energy conservation to ensure industrial plant operational safety, security, suitability, and effectiveness to meet the nation's missile production needs; 2) ensure compliance with environmental laws and regulations to avoid risk of shutdown due to non-compliance, clean-up costs, and civil fines and penalties; 3) achieve compliance through pollution prevention to reduce controlled emissions and hazardous waste generation through alternatives to using hazardous materials in armaments production. Air Force Plant 44 is the backbone of Department of War (DoW) weapon systems assembly and maintenance supporting Storm Breaker, AMRAAM, Javelin, Griffin, Phalanx, Sidewinder, Standard Missiles, Stinger, Tomahawk, and numerous other armaments programs. Funds are also provided within this appropriation to assess missile-related industrial base concerns (MPC 6000). Funding for this exhibit is contained in PE 78011F Justification: FY2027 funds missile-related industrial base assessments (MPC 6000), environmental compliance (MPC 7000) and capital type rehabilitation (MPC 3000) programs, at Air Force Plant 44, a unique defense asset which supports the production of several missile systems for the Air Force and the Navy. LI 000042 - Industrial Preparedness/Pol Prevention Air Force UNCLASSIFIED Page 1 of 1 P-1 Line #22 Volume 1 - 161 === page 192 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 162 === page 193 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 03: Modification of Inservice Missiles / BSA 1: Class IV ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: M30FLH / ICBM FUZE MOD Program Elements for Code B Items: 0604933F Other Related Program Elements: 0604933F Line Item MDAP/MAIS Code: 498 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Prior Years 388.965 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 151.985 0.991 0.718 0.732 0.000 1,051.856 153.569 157.049 197.847 - 197.847 To FY 2031 Complete Total - Less PY Advance Procurement ($ in Millions) 47.540 35.507 37.673 28.100 - 28.100 26.313 0.000 0.000 0.000 0.000 175.133 Net Procurement (P-1) ($ in Millions) 341.425 118.062 119.376 169.747 - 169.747 125.672 0.991 0.718 0.732 0.000 876.723 Plus CY Advance Procurement ($ in Millions) 148.820 26.313 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 0.000 175.133 Total Obligation Authority ($ in Millions) 490.245 144.375 119.376 169.747 - 169.747 125.672 0.991 0.718 0.732 0.000 1,051.856 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Prior year funding includes 18.4M which was executed in Program 0101213F, M30MLG, Minuteman III (MMIII) Modifications. Funding for this exhibit contained in Program 0101328F. Program Overview The Intercontinental Ballistic Missile (ICBM) Fuze Modernization program is designing and producing a functionally equivalent replacement for the current Mk21 fuze that will provide a 20-year threshold, 30year objective design life. Currently available Mk21/W87-0 fuze quantities do not meet United States Strategic Command's (USSTRATCOM) requirements and the current fuze is three times beyond its original ten year design life. The program will provide needed MMIII weapon system modifications, system testing, support/test equipment, data and training required to accommodate, field, and support the new Mk21 replacement fuze along with the W87-0 warhead as defined in the Air Force Global Strike Command (AFGSC) Requirements Traceability Memo dated 2 December 2013. In addition, the Joint Requirements Oversight Council (JROC) signed the program's JROC Memorandum validating the operational requirement for the program on 6 December 2016. A replacement Mk21/W87-0 fuze is urgently required to meet warfighter requirements and to ensure operational capability. The Mk21 reentry vehicle and fuze is designed to be deployed on the current MMIII and LGM-35A Sentinel weapon systems. Low Rate Initial Production The production units procured in FY22 through FY24 are considered Low Rate Initial Production (LRIP) units. The program completed Milestone C Decision on 4 October 2021 and approved for entrance into Full Rate Production (FRP) on 21 November 2024. Life of Type Buy (LOTB) The ICBM Fuze Modernization program procured Application Specific Integrated Circuit (ASIC), Heterojunction Bipolar Transistor (HBT), and power source components produced by the Department of Energy National Nuclear Security Administration (DOE/NNSA) as a LOTB through FY25. The DOE/NNSA Office of Stockpile Management (NA-12) procurement strategy for the ICBM Fuze Modernization program is structured to ensure the production schedule requirements are met. The DOE/NNSA required DoD funding that aligned with the planned production runs in order to meet DOE/NNSA's production commitments. This was the only viable approach because there is neither component availability nor process capacity within Kansas City National Security Campus (KCNSC). Purchasing components in a single production run or lot to support joint production activities was required to manage capacity and resource conflicts in the production workload within DOE/NNSA. DOE/NNSA has a large number of current and pending modernization activities necessitating careful planning and coordination among related programs that rely on the same vendors, components, and plant production space. Funding and building these components as a LOTB was critical to maintaining production line availability and schedule for the Mk21 ICBM Fuze Modernization, MK5/W88 Alt 370, B61-12 LEP, W87-1 Modification, and W80-4 LEP programs. LI M30FLH - ICBM FUZE MOD Air Force UNCLASSIFIED Page 1 of 8 P-1 Line #23 Volume 1 - 163 === page 194 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 03: Modification of Inservice Missiles / BSA 1: Class IV ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: M30FLH / ICBM FUZE MOD Program Elements for Code B Items: 0604933F Other Related Program Elements: 0604933F Line Item MDAP/MAIS Code: 498 Long Lead Production The ICBM Fuze Modernization program required advance procurement authority through FY25 to procure long-lead items (Model XI sensor hardware, Terminal Protection Device (TPD) connectors, cable assemblies, connector assemblies, and Commercial Off-the-Shelf (COTS) components for the Radar Module, Pathlength Module (PLM), Missile Interface & Controller Module (MICM), Firing Set Interface Module (FSIM), and Launch Safety Device (LSD)). Prior Year Activities Prior years funding includes Life of Type Buy (LOTB) procurements to affordably acquire qualified COTS parts for use during and after exposure to nuclear environments and to ensure commonality between the Air Force and the Navy. LOTB was executed jointly with the Navy to provide a pool of interchangeable, qualified, and certified parts for each Service's fuze. These parts will be delivered to DOE/NNSA's KCNSC for use in producing common component modules for the Air Force and Navy fuzes. Some component modules will be entirely interchangeable between the Services while others will have interchangeable subassemblies. FY27 funding continues Arming and Fuzing Assemblies (AFA) production, supporting a lot buy of 125 AFAs to support Full Rate Production (FRP) as well as continued LOTB procurements. These LOTB components were executed jointly with the Navy to provide a pool of interchangeable, qualified, and certified parts for each service's fuze. LI M30FLH - ICBM FUZE MOD Air Force UNCLASSIFIED Page 2 of 8 P-1 Line #23 Volume 1 - 164 === page 195 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 03: Modification of Inservice Missiles / BSA 1: Class IV ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: M30FLH / ICBM FUZE MOD Program Elements for Code B Items: 0604933F Other Related Program Elements: 0604933F Line Item MDAP/MAIS Code: 498 Exhibits Schedule Exhibit Type Title* P-3a 5915 / FUZE MODERNIZATION (Service Life Extension) P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code B Exhibits Schedule Exhibit Type Title* P-3a 5915 / FUZE MODERNIZATION (Service Life Extension) P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code B Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 388.965 - / 153.569 - / 157.049 - / 197.847 - / 388.965 - / 153.569 - / 157.049 - / 197.847 - / 0.000 - / - - / 197.847 / 197.847 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 151.985 - / 0.991 - / 0.718 - / 0.732 - / 0.000 - / 1,051.856 - / 151.985 - / 0.991 - / 0.718 - / 0.732 - / 0.000 - / 1,051.856 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Where applicable, justification for individual modification is provided in the P-3A exhibits. LI M30FLH - ICBM FUZE MOD Air Force UNCLASSIFIED Page 3 of 8 P-1 Line #23 Volume 1 - 165 === page 196 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F / 03 / 1 P-1 Line Item Number / Title: M30FLH / ICBM FUZE MOD ID Code (A=Service Ready, B=Not Service Ready) : B Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Modification Number / Title: 5915 / FUZE MODERNIZATION MDAP/MAIS Code: Prior Years 388.965 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 0.991 0.718 0.732 0.000 1,051.856 153.569 157.049 197.847 0.000 197.847 151.985 To FY 2031 Complete Total - Less PY Advance Procurement ($ in Millions) 47.540 35.507 37.673 40.216 - 40.216 26.313 - - - 0.000 187.249 Net Procurement (P-1) ($ in Millions) 341.425 118.062 119.376 157.631 0.000 157.631 125.672 0.991 0.718 0.732 0.000 864.607 Plus CY Advance Procurement ($ in Millions) 148.820 26.313 0.000 0.000 - 0.000 0.000 - - - 0.000 175.133 Total Obligation Authority ($ in Millions) 490.245 144.375 119.376 157.631 0.000 157.631 125.672 0.991 0.718 0.732 0.000 1,039.740 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Prior year funding includes 18.4M which was executed in Program 0101213F, M30MLG, MMIII Modifications. Funding for this exhibit contained in Program 0101328F. Program Overview The Intercontinental Ballistic Missile (ICBM) Fuze Modernization Program is designing and producing a functionally equivalent replacement for the current Mk21 fuze that will provide a 20-year threshold, 30year objective design life. Currently available Mk21/W87-0 fuze quantities do not meet United States Strategic Command (USSTRATCOM) requirements and the current fuze is three times beyond its original ten year design life. The program will provide needed MMIII weapon system modifications, system testing, support/test equipment, data and training required to accommodate, field, and support the new Mk21 replacement fuze along with the W87-0 warhead as defined in the Air Force Global Strike Command (AFGSC) Requirements Traceability Memo dated 2 December 2013. In addition, the Joint Requirements Oversight Council (JROC) signed the program's JROC Memorandum validating the operational requirement for the program on 6 December 2016. A replacement Mk21/W87-0 fuze is urgently required to meet warfighter requirements and to ensure operational capability. The Mk21 reentry vehicle and fuze is designed to be deployed on the current Minuteman III (MMIII) and LGM-35A Sentinel weapon systems. Low Rate Initial Production (LRIP) The production units procured in FY22 through FY24 are considered Low Rate Initial Production (LRIP) units. The program approved for entrance into Full Rate Production (FRP) on 21 November 2024. Life of Type Buy (LOTB) The ICBM Fuze Modernization program procured Application Specific Integrated Circuit (ASIC), Heterojunction Bipolar Transistor (HBT), and power source components produced by the Department of Energy National Nuclear Security Administration (DOE/NNSA) as a LOTB through FY25. The DOE/NNSA Office of Stockpile Management (NA-12) procurement strategy for the ICBM Fuze Modernization program was structured to ensure the production schedule requirements were met. The DOE/NNSA required DoD funding that was aligned with the planned production runs in order to meet DOE/ NNSA's production commitments. This was the only viable approach given there is neither component availability nor process capacity on any other schedule. Purchasing components in a single production run or lot to support joint production activities was required to manage capacity and resource conflicts in the production workload within DOE/NNSA. DOE/NNSA has a large number of current and pending modernization activities necessitating careful planning and coordination among related programs that rely on the same vendors, components, and plant production space. Funding and building these components as a LOTB was critical to maintaining production line availability and schedule for the Mk21 ICBM Fuze Modernization, MKS/W88 Alt 370, B61-12 LEP, W87-1 Modification, and W80-4 LEP programs. Long Lead Production LI M30FLH - ICBM FUZE MOD Air Force UNCLASSIFIED Page 4 of 8 P-1 Line #23 Volume 1 - 166 === page 197 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F / 03 / 1 P-1 Line Item Number / Title: M30FLH / ICBM FUZE MOD ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: 5915 / FUZE MODERNIZATION MDAP/MAIS Code: The ICBM Fuze Modernization program required advance procurement authority through FY25 to procure long lead items (Model XI sensor hardware, Terminal Protection Device (TPD) connectors, cable assemblies, connector assemblies, and Commercial Off-the-Shelf (COTS) components for the Radar Module, Pathlength Module (PLM), Missile Interface & Controller Module (MICM), Firing Set Interface Module (FSIM), and Launch Safety Device (LSD)). Prior Year Activities Prior Years funding includes LOTB procurements to affordably acquire qualified COTS parts for use during and after exposure to nuclear environments and to ensure commonality between the Air Force and the Navy. LOTB was executed jointly with the Navy to provide a pool of interchangeable, qualified, and certified parts for each service's fuze. Procured parts will be delivered to DOE/NNSA's KCNSC for use in producing common component modules for the Air Force and Navy fuzes. Some component modules will be entirely interchangeable between the Services while others will have interchangeable sub-assemblies. Current Year FY25 funds include procurement of 104 Arming and Fuzing Assemblies (AFAs) to support Full Rate Production (FRP) as well as continued LOTB procurements. These LOTB components were executed jointly with the Navy to provide a pool of interchangeable, qualified, and certified parts for each service's fuze. FY26 funding continues AFA production, supporting a lot buy of 110 AFAs to support FRP as well as continued LOTB procurements. These LOTB components were executed jointly with the Navy to provide a pool of interchangeable, qualified, and certified parts for each service's fuze. FY27 funding continues AFA production, supporting a lot buy of 125 AFAs to support FRP as well as continued LOTB procurements. These LOTB components were executed jointly with the Navy to provide a pool of interchangeable, qualified, and certified parts for each service's fuze. The cost of B kits increased from FY26 to FY27 due to standard hour increases and labor rate increases. Milestone/Development Status Milestone/Development Status The program entered phase 6.5 (first Production) on 6 March 2024. During Phase 6.5, the components and systems final design and process development are completed in preparation for system production readiness. Production Engineering stage activities include 1) verification of production readiness, 2) completion of qualification of processes, equipment, and product, 3) maturation of manufacturing processes and technology to a level sufficient for steady-state production and 4) completion of the formal documentation needed to move into steady-state production. The first flight test was performed in FY19, the second flight test was performed in FY20, the third in FY22, and the final flight test was completed on 4 June 2024. The program is tailored to use the joint Department of Defense - Department of Energy Phase 6.X processes for routine nuclear stockpile activities to align with Navy and DOE/NNSA operations. The Next Phase will be 6.6 Full Scale Production, program plans to enter Phase 6.6 2QFY2026. Research, Development, Test and Evaluation (RDT&E) is contained in Program Element 0604933F. Baseline Design Review (BDR) completed 23 May 2017. Final Design Review (FDR) completed 19 August 2020. Qualification Evaluation Release (QER) Completed 9 February 2024. Flight Unit 4 (FTU4) as part of GT249 launched 4 June 2024. Initial Operational Test & Evaluation (IOT&E) report released on 4 April 2025. The ICBM Fuze Mod Program discovered the need to de-couple Milestone C and Full Rate Production (FRP) from the DOE/NNSA Phase 6.x process Phase 6.5 and Phase 6.6 respectively. At the time of the initial baseline in 2014, Phase 6.5 and Phase 6.6 were selected as the surrogates for the DoD milestones. Differences between the DOE/NNSA Phase 6.x process and the DoDI 5000-Series instructions, as it relates to funding Title 10 programs, drove a de-coupling of these milestones into the Acquisition Program Baseline (APB). This program is still being managed according to the Phase 6.x process; however, Milestone C (completed October 2021) and the FRP Decision (completed 21 November 2024) were added as milestones to satisfy statutory requirements of a Major Defense Acquisition Program. LI M30FLH - ICBM FUZE MOD Air Force UNCLASSIFIED Page 5 of 8 P-1 Line #23 Volume 1 - 167 === page 198 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: M30FLH / ICBM FUZE MOD Appropriation / Budget Activity / Budget Sub Activity: 3020F / 03 / 1 ID Code (A=Service Ready, B=Not Service Ready) : B MDAP/MAIS Code: Models of Systems Affected: LGM-30G Related RDT&E PEs: 0604933F Modification Type: Service Life Extension Prior Years Financial Plan Modification Number / Title: 5915 / FUZE MODERNIZATION FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) RDT&E PE # 0604933F - / 1,417.775 - / - 199 / 272.287 104 / 145.458 - / 3.252 - / - - / - - 125 / 191.887 / - - / - - / - - / - - / - - / - - 117 / 147.099 / 1,421.027 Procurement Modification Item 1 of 2: ICBM Fuze B Kits Recurring ICBM Fuze:EQUIPMENT Group B (Active) Subtotal: Recurring Subtotal: ICBM Fuze - / - 125 / 191.887 - / - - / - - / - - / - 655 / 904.202 - / 272.287 - / 145.458 110 / 147.471 - / 147.471 - / 191.887 - / - - / 191.887 - / 147.099 - / - - / - - / - - / - - / 904.202 - / 272.287 - / 145.458 - / 147.471 - / 191.887 - / - - / 191.887 - / 147.099 - / - - / - - / - - / - - / 904.202 Modification Item 2 of 2: Life of Type Buy (NNSA) B Kits Recurring Life of Type Buy (NNSA):EQUIPMENT Group B (Active) Subtotal: Recurring Subtotal: Life of Type Buy (NNSA) Subtotal: Procurement, All Modification Items - / 50.765 - / 2.646 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 53.411 - / 50.765 - / 2.646 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 53.411 - / 50.765 - / 2.646 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 191.887 - / - / 147.099 - / - - / - - / - - / - - - / 323.052 - - / 148.104 - / 147.471 - - / 191.887 - / 53.411 / 957.613 - Support (All Modification Items) GROUP B: TOTAL NONRECURRING - / 51.619 - - / 3.248 SIM/TRAINER - / 2.885 - / - OTHER GOVT - / 0.007 - / - PSC - Other Gov't Costs - / 8.154 - / 65.913 - Subtotal: Support - - / - Change Orders / 1.392 - / / 1.031 - - / - - / - / 1.034 - / - - / / 1.034 - / - - / - - / - - / - - / - / 0.847 - / - - / - - / - - / - - / 51.619 / 7.552 / 2.885 / - - / - - / - - / - - / - - / - - / - - / - - / - - - / 3.954 - / - - / - - / - - / - - / - - / - - / - - / - - / 4.073 - / 4.593 - / 4.926 - / - - / 4.926 - / 4.039 - / 0.991 - / 0.718 - / 0.732 - / - - / 28.226 / 5.465 - / 9.578 - / 5.960 - / - - / 5.960 - / 4.886 - / 0.991 - / 0.718 - / 0.732 - / - - / 94.243 / - - / - - / - - / - 0.000 197.847 / 3.961 Installation Subtotal: Installation - / - - / - - / - - / - - / - - / - - / - - - / - Total Total Cost (Procurement + Support + Installation) LI M30FLH - ICBM FUZE MOD Air Force 388.965 153.569 157.049 197.847 UNCLASSIFIED Page 6 of 8 151.985 0.991 P-1 Line #23 0.718 0.732 0.000 1,051.856 Volume 1 - 168 === page 199 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F / 03 / 1 P-1 Line Item Number / Title: M30FLH / ICBM FUZE MOD ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: 5915 / FUZE MODERNIZATION MDAP/MAIS Code: Modification Item 1 of 2: ICBM Fuze Manufacturer Information Manufacturer Name: Kansas City National Security Campus Manufacturer Location: Kansas City, KS Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 30 Dates FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Dec 2024 Dec 2025 Dec 2026 Dec 2027 Delivery Dates Jun 2027 Jun 2028 Jun 2029 Jun 2030 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation (Organic): Org/Intermediate LI M30FLH - ICBM FUZE MOD Air Force Installation Quantity: 655 UNCLASSIFIED Page 7 of 8 P-1 Line #23 Volume 1 - 169 === page 200 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F / 03 / 1 P-1 Line Item Number / Title: M30FLH / ICBM FUZE MOD ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: 5915 / FUZE MODERNIZATION MDAP/MAIS Code: Modification Item 2 of 2: Life of Type Buy (NNSA) Manufacturer Information Manufacturer Name: National Nuclear Security Administration Manufacturer Location: Various Administrative Leadtime (in Months): 0 Dates FY 2025 Production Leadtime (in Months): 0 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 Contract Dates Delivery Dates Installation Information Method of Implementation (Organic): Org/Intermediate LI M30FLH - ICBM FUZE MOD Air Force Installation Quantity: 0 UNCLASSIFIED Page 8 of 8 P-1 Line #23 Volume 1 - 170 === page 201 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 03: Modification of Inservice Missiles / BSA 1: Class IV P-1 Line Item Number / Title: M30FLH / ICBM FUZE MOD Program Elements for Code B Items: 0604933F Other Related Program Elements: 0604933F Line Item MDAP/MAIS Code: 498 Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Gross/Weapon System Cost ($ in Millions) 148.820 26.313 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 0.000 175.133 Net Procurement (P-1) ($ in Millions) 148.820 26.313 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 0.000 175.133 Total Obligation Authority ($ in Millions) 148.820 26.313 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 0.000 175.133 Description: The ICBM Fuze Modernization program required Advance Procurement (AP), authority through FY25 to procure long-lead items (Model XI sensor hardware, Terminal Protection Device (TPD) connectors, cable assemblies, connector assemblies, and Commercial Off-the-Shelf (COTS) components for the Radar Module, Pathlength Module (PLM), Missile Interface & Controller Module (MICM), Firing Set Interface Module (FSIM), and Launch Safety Device (LSD)). AP enabled continuation of the program's manufacturing schedule established in FY20. The key component associated with the three-year advance procurement lead time was the Model XI sensor assembly, which was also the most expensive subcomponent in the Bill of Material. LI M30FLH - ICBM FUZE MOD Air Force UNCLASSIFIED Page 1 of 4 P-1 Line #24 Volume 1 - 171 === page 202 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 03: Modification of Inservice Missiles / BSA 1: Class IV P-1 Line Item Number / Title: M30FLH / ICBM FUZE MOD Program Elements for Code B Items: 0604933F Other Related Program Elements: 0604933F Line Item MDAP/MAIS Code: 498 Exhibits Schedule Exhibit Type Title* ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-10 5915 / FUZE MODERNIZATION - / 148.820 - / 26.313 - / 0.000 - / 0.000 - / - - P-40 Total Gross/Weapon System Cost - / 148.820 - / 26.313 - / 0.000 - / 0.000 - / - - Exhibits Schedule Exhibit Type Title* ID CD MDAP/ MAIS Code / 0.000 / 0.000 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-10 5915 / FUZE MODERNIZATION - / 0.000 P-40 Total Gross/Weapon System Cost - / 0.000 - / / 0.000 - / / 0.000 - / - - / 0.000 - / 175.133 / 0.000 - / 0.000 - / 175.133 *Title represents the P-10 Title for Advance Procurement. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: No FY27 Advance Procurement funds are requested The ICBM Fuze Modernization program requires advance procurement authority through FY25 to procure long-lead items (Model XI sensor hardware, Terminal Protection Device (TPD) connectors, cable assemblies, connector assemblies, and Commercial Off-the-Shelf (COTS) components for the Radar Module, Pathlength Module (PLM), Missile Interface & Controller Module (MICM), Firing Set Interface Module (FSIM), and Launch Safety Device (LSD)). LI M30FLH - ICBM FUZE MOD Air Force UNCLASSIFIED Page 2 of 4 P-1 Line #24 Volume 1 - 172 === page 203 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Air Force Date: April 2026 P-1 Line Item Number / Title: M30FLH / ICBM FUZE MOD Appropriation / Budget Activity / Budget Sub Activity: 3020F / 03 / 1 First System (2027) Award Date: December 2026 P-3a Number / Title: 5915 / FUZE MODERNIZATION First System (2027) Completion Date: June 2029 FUZE MODERNIZATION Interval Between Systems: 1 Months Production Leadtime Prior Years (Months) Quantity (Each) 30 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 To Complete - - - - - - - - FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 To Complete (Each) - (Each) (Each) (Each) (Each) (Each) (Each) (Each) Total (Each) - When Required Prior Years ICBM FUZE MOD Hardware: ICBM Fuze Mod Hardware 24 62.047 0.000 0.000 0.000 0.000 - - - 0.000 62.047 ICBM FUZE MOD Hardware: Radar COTS 24 1.803 0.625 0.000 0.000 0.000 - - - 0.000 2.428 ICBM FUZE MOD Hardware: MICM COTS 24 1.408 0.489 0.000 0.000 0.000 - - - 0.000 1.897 ICBM FUZE MOD Hardware: FSIM COTS 24 3.063 1.063 0.000 0.000 0.000 - - - 0.000 4.126 ICBM FUZE MOD Hardware: PLM COTS 24 0.199 0.069 0.000 0.000 0.000 - - - 0.000 0.268 ICBM FUZE MOD Hardware: Mod XI Sensor Assembly 24 68.436 19.952 0.000 0.000 0.000 - - - 0.000 88.388 ICBM FUZE MOD Hardware: TPD Connectors 24 0.843 0.293 0.000 0.000 0.000 - - - 0.000 1.136 ICBM FUZE MOD Hardware: LSDA Header Shell and Parts 24 3.555 1.234 0.000 0.000 0.000 - - - 0.000 4.789 ICBM FUZE MOD Hardware: Cable Assembly 24 1.977 0.685 0.000 0.000 0.000 - - - 0.000 2.662 ICBM FUZE MOD Hardware: Connector and Subassemblies 24 1.969 0.683 0.000 0.000 0.000 - - - 0.000 2.652 ICBM FUZE MOD Hardware: Other (Key Number and Misc Items) 24 3.520 1.220 0.000 0.000 0.000 - - - 0.000 4.740 Total: CFE 148.820 26.313 0.000 0.000 0.000 - - - 0.000 175.133 Total Advance Procurement/Obligation Authority 148.820 26.313 0.000 0.000 0.000 - - - 0.000 175.133 Cost Elements (Months) ($ M) ($ M) ($ M) ($ M) ($ M) ($ M) ($ M) ($ M) ($ M) Total ($ M) CFE LI M30FLH - ICBM FUZE MOD Air Force UNCLASSIFIED Page 3 of 4 P-1 Line #24 Volume 1 - 173 === page 204 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Air Force Date: April 2026 Appropriation / Budget Activity / Budget Sub Activity: 3020F / 03 / 1 P-1 Line Item Number / Title: M30FLH / ICBM FUZE MOD P-3a Number / Title: 5915 / FUZE MODERNIZATION FY 2027 Cost Elements Production Leadtime QPA Unit Cost (Months) (Each) ($ M) Contract Forecast Date 2027 Qty For FY (Each) Total Cost Request ($ M) CFE ICBM FUZE MOD Hardware: ICBM Fuze Mod Hardware - 30 0.000 Dec 2026 0 0.000 ICBM FUZE MOD Hardware: Radar COTS - 30 0.000 Dec 2026 0 0.000 ICBM FUZE MOD Hardware: MICM COTS - 30 0.000 Dec 2026 0 0.000 ICBM FUZE MOD Hardware: FSIM COTS - 30 0.000 Dec 2026 0 0.000 ICBM FUZE MOD Hardware: PLM COTS - 30 0.000 Dec 2026 0 0.000 ICBM FUZE MOD Hardware: Mod XI Sensor Assembly - 30 0.000 Dec 2026 0 0.000 ICBM FUZE MOD Hardware: TPD Connectors - 30 0.000 Dec 2026 0 0.000 ICBM FUZE MOD Hardware: LSDA Header Shell and Parts - 30 0.000 Dec 2026 0 0.000 ICBM FUZE MOD Hardware: Cable Assembly - 30 0.000 Dec 2026 0 0.000 ICBM FUZE MOD Hardware: Connector and Subassemblies - 30 0.000 Dec 2026 0 0.000 ICBM FUZE MOD Hardware: Other (Key Number and Misc Items) - 30 0.000 Dec 2026 0 0.000 Total: CFE 0.000 Total Advance Procurement/Obligation Authority 0.000 Description: The ICBM Fuze Modernization program required Advance Procurement authority through FY25 to procure long lead items (Model XI sensor hardware, Terminal Protection Device (TPD) connectors, cable assemblies, connector assemblies, and Commercial Off-the-Shelf (COTS) components for the Radar Module, Pathlength Module (PLM), Missile Interface & Controller Module (MICM), Firing Set Interface Module (FSIM), and Launch Safety Device (LSD)). LI M30FLH - ICBM FUZE MOD Air Force UNCLASSIFIED Page 4 of 4 P-1 Line #24 Volume 1 - 174 === page 205 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 03: Modification of Inservice Missiles / BSA 1: Class IV P-1 Line Item Number / Title: M30MLG / MM III Modifications Program Elements for Code B Items: 0101213F ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0101213F, 0303131F Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 513.059 513.059 513.059 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 24.212 14.604 9.865 - 9.865 11.547 0.389 0.397 0.000 - - - - - 24.212 14.604 9.865 - 9.865 - - - - - 24.212 14.604 9.865 - 9.865 431.891 431.891 431.891 To FY 2031 Complete - - - - 11.547 0.389 0.397 0.000 - - - - 11.547 0.389 0.397 0.000 Total 1,005.964 1,005.964 1,005.964 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: This line item funds modifications to the LGM-30G, Minuteman III (MM III) Intercontinental Ballistic Missile (ICBM) weapon system. The MM III is a strategic missile capable of delivering special weapons against a wide range of targets. The purpose of the modifications budgeted in FY2027 is to support the operational capability of the MM III ICBM through the completion of deployment of Sentinel. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. The modifications being performed on LGM-30 include: Minuteman Minimum Essential Emergency Communications Network (MEECN) modification, LGM-30G Low Cost Modifications (LCM), and Arm/Disarm Switch Replacement (ADSR). The Fast Rising B-Plug Energy Storage System-Replacement (FRBP ESS-R) has returned to Engineering & Manufacturing Development but with a greatly expedited schedule. Program had FY2025 funding, no FY2026 funding and now requires production funding for pre-production activities in 1QFY27 to continue this effort. The FRBP EMD effort ends in FY2029. RDT&E funding for modifications other than MEECN is contained in PE 0101213F (PE 0604851F prior to FY2015); MEECN is contained in PE 0303131F. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. The FY25 rescission of $12.818M is not reflected in this budget documentation. LI M30MLG - MM III Modifications Air Force UNCLASSIFIED Page 1 of 6 P-1 Line #25 Volume 1 - 175 === page 206 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 03: Modification of Inservice Missiles / BSA 1: Class IV ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: M30MLG / MM III Modifications Program Elements for Code B Items: 0101213F Other Related Program Elements: 0101213F, 0303131F Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a*** 5910 / MINUTEMAN MEECN MODIFICATION (Capability Improvement) - / 140.552 P-40a*** 5916 / ICBM Cryptography Upgrade Increment II (Capability Improvement) - / 160.575 - / - P-40a*** 5921 / MM LCC Block Upgrades (Service Life Extension) - / 40.591 - / - P-40a*** 5928 / T-9 Launch Facility Trainer Conversion (T-9) (Other) - / 44.463 - P-40a*** 5932 / LGM-30G Remote Visual Assessment Phase II (RVA II) (Other) - / 83.215 P-40a*** 5942 / LGM-30G Launch Control Center Break-In-Kit (LCCB) (Other) - P-40a*** 5948 / CMPT upgrade (Other) P-40a*** / 3.010 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 0.226 - / - - / - - / - - / - - / - - / 0.258 - / - - / - - / - - / - - / - 5949 / Fast Rising B-Plug Energy Storage System Replacement (FRBP ESS-R) (Service Life Extension) - / 20.861 - / 12.818 / - - / 1.700 - / - - / 1.700 P-40a*** 99999X / Low Cost Modifications (Other) - / 22.318 - / 6.655 - / 0.640 - / 1.000 - / - - / 1.000 P-3a 5947 / A/D Switch Replacement (Reliability & Maintainability) - / 0.000 - / 0.000 - / 10.954 - / 7.165 / 0.000 - / 7.165 P-40 Total Gross/Weapon System Cost / 513.059 - / 24.212 - / 14.604 - / 9.865 / - - B - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code - / 4.739 - - - / 9.865 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a*** 5910 / MINUTEMAN MEECN MODIFICATION (Capability Improvement) P-40a*** 5916 / ICBM Cryptography Upgrade Increment II (Capability Improvement) - / - - / - - / - P-40a*** 5921 / MM LCC Block Upgrades (Service Life Extension) - / - - / - - / - P-40a*** 5928 / T-9 Launch Facility Trainer Conversion (T-9) (Other) - / - - / - - P-40a*** 5932 / LGM-30G Remote Visual Assessment Phase II (RVA II) (Other) - / - - / - P-40a*** 5942 / LGM-30G Launch Control Center Break-In-Kit (LCCB) (Other) - / - - P-40a*** 5948 / CMPT upgrade (Other) - / - - P-40a*** 5949 / Fast Rising B-Plug Energy Storage System Replacement (FRBP ESS-R) (Service Life Extension) P-40a*** 99999X / Low Cost Modifications (Other) P-3a 5947 / A/D Switch Replacement (Reliability & Maintainability) P-40 Total Gross/Weapon System Cost - B / 5.000 - / 0.275 - / 422.813 - - / 0.078 - - / 0.387 / 0.395 - / - - / 149.436 - / - - / - - / 160.575 - / - - / - - / 40.591 / - - / - - / - - / 44.463 - / - - / - - / - - / 83.215 / - - / - - / - - / - - / 0.226 / - - / - - / - - / - - / 0.258 / 11.270 - / - - / - - / - - / 51.649 / - - / - - / - - / - - / 453.426 / 4.000 - / 0.000 - / 0.000 / 431.891 - / 11.547 - / 0.389 - - / / 0.397 - / / 0.000 - / 22.119 / 1,005.964 *** Although this is an Exhibit P-40a item, the actual exhibit is not included since all of the required information for this item is already being shown here. *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. LI M30MLG - MM III Modifications Air Force UNCLASSIFIED Page 2 of 6 P-1 Line #25 Volume 1 - 176 === page 207 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 03: Modification of Inservice Missiles / BSA 1: Class IV ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: M30MLG / MM III Modifications Program Elements for Code B Items: 0101213F Other Related Program Elements: 0101213F, 0303131F Line Item MDAP/MAIS Code: N/A Justification: FY 2027 funding requests include Minuteman MEECN Modification & MM III Low Cost Modifications. Where applicable, justification for individual modifications is provided in the P-3A exhibits. FRBP: Due to the number of Mission Impaired Capability Awaiting Parts (MICAPs) with the legacy system, great strides are being made to expedite the FRBP schedule. Recent schedule saving initiatives allow for production and fielding activities a year earlier, while still delivering a quality product to the Warfighter. The Energy Storage System (ESS) is further along in the engineering process and has been decoupled from the Support Equipment (SE) in the program schedule. ESS EMD to complete 1QFY28 and SE EMD to complete 1QFY29. LI M30MLG - MM III Modifications Air Force UNCLASSIFIED Page 3 of 6 P-1 Line #25 Volume 1 - 177 === page 208 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F / 03 / 1 P-1 Line Item Number / Title: M30MLG / MM III Modifications ID Code (A=Service Ready, B=Not Service Ready) : B Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 5947 / A/D Switch Replacement MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 0.000 0.000 10.954 7.165 0.000 7.165 4.000 0.000 0.000 - - 22.119 Total - - - - - - - - - - - - 0.000 0.000 10.954 7.165 0.000 7.165 4.000 0.000 0.000 - - 22.119 - - - - - - - - - - - - 0.000 0.000 10.954 7.165 0.000 7.165 4.000 0.000 0.000 - - 22.119 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) 0.000 - - - - - - - - - - 0.000 - - - - - - - - - - - - Description: The Arm/Disarm Switch Replacement (ADSR) program designs, develops, fabricates, and tests replacements for the aging Arm/Disarm (A/D) switches currently on the MM III missile fleet. The A/D switch is responsible for completing or interrupting ordnance electrical circuits. A/D switches are placed at five key locations in the system: Inter-stage I-II, Stage II Liquid Injection Thrust Vector Control (LITVC) and Roll Control, Inter-stage II-III, Propulsion System Rocket Engine (PSRE) Staging, and PSRE Isolation Valves. Aging and surveillance is an ongoing study to generate a tradeoff curve between reliability/availability and cost. Reliability/availability are monitored by periodic testing to discover unforeseen issues. All existing A/D switches cannot be repaired/refurbished, the number in inventory will eventually be inadequate to meet the need of the programmed depot maintenance (PDM)/Analytical Condition Inspection (ACI) cycle. Repair/refurbish is a reliable mitigation plan to meet the ongoing needs of the fleet while a manufacturer is selected and the manufacturing system is selected to develop a replacement A/D switch that meets requirements and PDM production quantities. ADSR is required to continue booster and PSRE PDMs/ACIs. Milestone/Development Status Key ADSR development activities include: ADSR EMD: 1Q FY 2025 - 4Q FY 2027 ADSR Milestone C: Aug 2027 ADSR Production and Deployment: 4Q FY 2027 - 3Q FY 2030 LI M30MLG - MM III Modifications Air Force UNCLASSIFIED Page 4 of 6 P-1 Line #25 Volume 1 - 178 === page 209 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: M30MLG / MM III Modifications Appropriation / Budget Activity / Budget Sub Activity: 3020F / 03 / 1 ID Code (A=Service Ready, B=Not Service Ready) : B MDAP/MAIS Code: Models of Systems Affected: LGM-30G Related RDT&E PEs: 0101213F Modification Type: Reliability & Maintainability Prior Years Financial Plan Modification Number / Title: 5947 / A/D Switch Replacement FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) RDT&E PE # 0101213F - / 17.110 - / - - / 3.476 - / - - / - 116 / 10.245 - / - - / - - / 10.245 - / - - / - - - / - - / - - - / - - / - - / 0.709 - / - - / - - / 0.709 - / - - / - / - - / 1.669 - / - - / 1.669 - / 0.200 - / - - / - - / - - / - - / 22.455 116 / 7.165 - / - 116 / 7.165 - / 4.000 - / - - / - - / - - / - 232 / 21.410 - / 7.165 - / - - / 7.165 - / 4.000 - / - - / - - / - - / - - / 21.410 / 10.245 - / 7.165 - / - - / 7.165 - / 4.000 - / - - / - - / - - / - - / 21.410 / 10.245 - / 7.165 - / - - / 7.165 - / 4.000 - / - - / - - / - - / - - / 21.410 - / - - / - - / - - / - - / - - / - - / - - / - - / 0.709 - / - - / - - / - - / - - / - - / - - / - - / - - / 0.709 - / - - / - - / - - / - - / - - / - - / - - / - Procurement Modification Item 1 of 1: ADSR B Kits Recurring ADSR:EQUIPMENT Group B (Active) Subtotal: Recurring Subtotal: ADSR Subtotal: Procurement, All Modification Items Support (All Modification Items) PMA - Other Gov't Costs Subtotal: Support Installation Subtotal: Installation - - / - Total Total Cost (Procurement + Support + Installation) LI M30MLG - MM III Modifications Air Force 0.000 0.000 10.954 7.165 0.000 UNCLASSIFIED Page 5 of 6 7.165 4.000 0.000 P-1 Line #25 0.000 - - 22.119 Volume 1 - 179 === page 210 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F / 03 / 1 P-1 Line Item Number / Title: M30MLG / MM III Modifications ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: 5947 / A/D Switch Replacement MDAP/MAIS Code: Modification Item 1 of 1: ADSR Manufacturer Information Manufacturer Name: Ensign-Bickford Aerospace & Defense (EBAD) Manufacturer Location: California Administrative Leadtime (in Months): 2 Dates FY 2025 Production Leadtime (in Months): 10 FY 2026 FY 2027 Contract Dates Aug 2027 Aug 2028 Delivery Dates Jun 2028 Jun 2029 FY 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation (Organic): Org/Intermediate LI M30MLG - MM III Modifications Air Force Installation Quantity: 232 UNCLASSIFIED Page 6 of 6 P-1 Line #25 Volume 1 - 180 === page 211 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 03: Modification of Inservice Missiles / BSA 1: Class IV P-1 Line Item Number / Title: MALCBG / Air Launch Cruise Missile (ALCM) Program Elements for Code B Items: 0101122F ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: 0101122F Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - 34.019 41.393 30.407 - 30.407 47.625 8.062 8.234 8.395 0.000 242.741 242.741 242.741 To FY 2031 Complete - - - - - - - - - - 34.019 41.393 30.407 - 30.407 47.625 8.062 8.234 8.395 0.000 - - - - - - - - - - 34.019 41.393 30.407 - 30.407 47.625 8.062 8.234 8.395 0.000 Total 420.876 420.876 420.876 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The AGM-86B, Air Launched Cruise Missile (ALCM), is a subsonic, air-to-surface strategic nuclear missile, operational since 1982. Armed with a W80 warhead, it is designed to evade air and ground-based defenses in order to strike targets at any location within any enemy's territory. ALCM was designed for both B-52H internal and external carriage. Funding for this exhibit is contained in PE 0101122F. Change Summary: All modification programs have been adjusted to reflect the current calendar year program office estimates (POE). POEs are based on a combination of actuals, proposals, rough order of magnitude estimates from contractors, and subject matter expert inputs. LI MALCBG - Air Launch Cruise Missile (ALCM) Air Force UNCLASSIFIED Page 1 of 11 P-1 Line #26 Volume 1 - 181 === page 212 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 03: Modification of Inservice Missiles / BSA 1: Class IV ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: MALCBG / Air Launch Cruise Missile (ALCM) Program Elements for Code B Items: 0101122F Other Related Program Elements: 0101122F Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a*** _0468 / AGM-86B Low Cost Mods (Other) - / 2.096 P-40a*** 860009 / AGM-86B CALCM/ALCM Test Instrumentation Kit (Capability Improvement) - / 47.644 - / 6.056 P-40a*** 860011 / Support Equipment (Reliability & Maintainability) - / 12.832 - / 0.285 - P-40a*** 860101 / AGM-86B Service Life Extension Program 1 (Service Life Extension) - / 26.763 - / 12.526 - P-40a*** 860103 / Warhead Arming Device (WAD) (Service Life Extension) - / 7.593 P-40a*** 860104 / Rotary Switch (RS) (Reliability & Maintainability) - / 51.393 - / 3.266 - P-40a*** 860105 / Guided Missile Flight Controller (GMFC) (Reliability & Maintainability) - / 14.185 - / 1.859 - P-40a*** 860106 / W-10 Cable (Service Life Extension) - / 2.759 - / 0.027 P-40a*** 860107 / Fuze Assembly (Service Life Extension) - / 10.608 - / 6.552 - / 0.000 P-40a*** 860110 / Voltage Regulator (Reliability & Maintainability) - / 0.432 - / 1.039 - P-40a*** 860111 / Elevon Actuator Controller (EAC) (Reliability & Maintainability) - / 4.201 - / 1.586 P-3a 860108 / Inertial Navigation Element (INE) (Reliability & Maintainability) B - / 60.493 - P-3a 860109 / Flight Data Transmitter (Service Life Extension) A - / 1.742 - P-40 Total Gross/Weapon System Cost - / 34.019 - Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code - - / 242.741 / - - / 0.001 - - / - - - / - - / - - / 0.032 - / - - / - - / - / 2.110 - / - - / 0.009 - / - - / - - / - - / 0.007 - / - - / 0.007 / 0.001 - / 2.444 - / - - / 2.444 - / 12.300 - / 3.972 - / - - / 3.972 / 0.823 - / 9.517 - / 9.959 - / 0.000 - / 9.959 / 0.000 - / 0.001 - / 11.864 - / 0.000 - / 11.864 - / 41.393 - / 30.407 / - - - / 0.378 - / 0.030 - / - - / 3.940 - / 15.225 - / - - - - / - / - - - - / 0.010 / - / - / - / / 0.010 / 0.032 - / / 2.110 / 0.009 - / - / 30.407 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a*** _0468 / AGM-86B Low Cost Mods (Other) - / - - / - - / - - / - - / - - / 2.097 P-40a*** 860009 / AGM-86B CALCM/ALCM Test Instrumentation Kit (Capability Improvement) - / - - / - - / - - / - - / - - / 53.700 P-40a*** 860011 / Support Equipment (Reliability & Maintainability) - / - - / - - / - - / - - / - - / 13.505 P-40a*** 860101 / AGM-86B Service Life Extension Program 1 (Service Life Extension) / 39.452 P-40a*** 860103 / Warhead Arming Device (WAD) (Service Life Extension) P-40a*** 860104 / Rotary Switch (RS) (Reliability & Maintainability) - P-40a*** 860105 / Guided Missile Flight Controller (GMFC) (Reliability & Maintainability) - / 11.110 P-40a*** 860106 / W-10 Cable (Service Life Extension) - / - P-40a*** 860107 / Fuze Assembly (Service Life Extension) - / - P-40a*** 860110 / Voltage Regulator (Reliability & Maintainability) LI MALCBG - Air Launch Cruise Missile (ALCM) Air Force - / 0.063 - - - / / 2.110 / 1.541 / 0.034 / 0.004 - / - - / - - / - - / - - / - - / - - / 7.593 / 0.005 - / - - / - - / - - / 62.824 - / - - / - - / - - / - - / 42.388 - / - - / - - / - - / - - / 2.786 - / - - / - - / - - / - - / 17.167 / 0.000 - / - - / - - / - - / 5.457 - - UNCLASSIFIED Page 2 of 11 - P-1 Line #26 Volume 1 - 182 === page 213 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 03: Modification of Inservice Missiles / BSA 1: Class IV ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: MALCBG / Air Launch Cruise Missile (ALCM) Program Elements for Code B Items: 0101122F Other Related Program Elements: 0101122F Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD P-40a*** 860111 / Elevon Actuator Controller (EAC) (Reliability & Maintainability) P-3a 860108 / Inertial Navigation Element (INE) (Reliability & Maintainability) B P-3a 860109 / Flight Data Transmitter (Service Life Extension) A P-40 Total Gross/Weapon System Cost MDAP/ MAIS Code FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 7.831 - / 8.023 - / 8.179 - / 8.273 - - / 12.502 - / 0.000 - / 0.051 - / 0.122 - - / 12.468 - / 0.000 - / 0.000 - / 0.000 - / 47.625 - / 8.062 - / 8.234 - / 8.395 - / 0.000 - / 54.365 / 0.000 - / 93.467 / - - / 26.075 / 0.000 - / 420.876 *** Although this is an Exhibit P-40a item, the actual exhibit is not included since all of the required information for this item is already being shown here. *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding will address modifications identified and described in the P40 and associated P-3As. LI MALCBG - Air Launch Cruise Missile (ALCM) Air Force UNCLASSIFIED Page 3 of 11 P-1 Line #26 Volume 1 - 183 === page 214 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F / 03 / 1 P-1 Line Item Number / Title: MALCBG / Air Launch Cruise Missile (ALCM) ID Code (A=Service Ready, B=Not Service Ready) : B Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 860108 / Inertial Navigation Element (INE) MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 60.493 0.823 9.517 9.959 0.000 9.959 12.502 0.000 0.051 0.122 0.000 93.467 Total - - - - - - - - - - - - 60.493 0.823 9.517 9.959 0.000 9.959 12.502 0.000 0.051 0.122 0.000 93.467 - - - - - - - - - - - - 60.493 0.823 9.517 9.959 0.000 9.959 12.502 0.000 0.051 0.122 0.000 93.467 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: AF Long Range Planning required the service life of the Air Launched Cruise Missile (ALCM) to be extended through Long Range Standoff (LRSO) Full Operational Capability continued support for Air Force Global Strike Command (AFGSC) and United States Strategic Command (USSTRATCOM) requirements. In order to satisfy the life extension requirement, several phases of the Service Life Extension program (SLEP) were implemented, for a proactive approach. Through studies and surveillance and analysis programs, various components were identified as candidates for replacement due to aging and obsolescence issues before they become fleet-wide problems. This modification executes a remanufacture of the Inertial Navigation Element (INE). The validated requirement for the INE SLEP is AF 1067 AFGSC 18-048. The INE deploys control surfaces and navigates the ALCM to the target. This modification is driven by multiple studies and addresses major aging concerns. The INE kit will be issued via a Time Compliance Technical Order (TCTO). The remanufactured INE TCTO will be available for installation at the organizational-level maintenance units for replacement of failed legacy INEs. The rate of installation is limited by remanufacture capacity at the contractor facility. The maximum remanufacture capacity is 40 per year. This effort is critical to meet AFGSC and USSTRATCOM operational needs. Funding adjustments made to reflect actual execution cost and future cost, reflecting variances from initial projections. Funds may be used to address emerging and short notice Diminishing Manufacturing and Material Shortage (DMSMS) issues. This modification supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Milestone/Development Status INE is currently in Phase 3 remanufacture/production. This phase produces the kits and includes TCTO installation. LI MALCBG - Air Launch Cruise Missile (ALCM) Air Force UNCLASSIFIED Page 4 of 11 P-1 Line #26 Volume 1 - 184 === page 215 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: MALCBG / Air Launch Cruise Missile (ALCM) Appropriation / Budget Activity / Budget Sub Activity: 3020F / 03 / 1 ID Code (A=Service Ready, B=Not Service Ready) : B MDAP/MAIS Code: Models of Systems Affected: AGM-86B Related RDT&E PEs: 0101122F Modification Type: Reliability & Maintainability Prior Years Financial Plan Modification Number / Title: 860108 / Inertial Navigation Element (INE) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) RDT&E PE # 0101122F - / 8.318 - / - - / - - / - - / - - / - - / - - - / - - / - - - / - - / - - 200 / 48.982 - / - 40 / 8.817 - / 48.982 - / - - / 8.817 - - / 48.982 - / - - / 8.817 - / 48.982 - / - - / 8.817 - / - - / - - / - - / - - / - - / - - / - 24 / 5.139 - / - 24 / 5.139 / - - / 5.139 - / - - / 5.139 - / - - / 5.139 - / - - / 5.139 - 16 / 3.426 - / - 16 / 3.426 / 3.426 - / - - / 3.426 - - / 3.426 - / - - / 3.426 - - / 8.565 - / - - / 8.565 / 8.318 48 / 6.721 - / - - / - - / - - / - 72 / 11.860 / 6.721 - / - - / - - / - - / - - / 11.860 / 6.721 - / - - / - - / - - / - - / 11.860 32 / 4.481 - / - - / - - / - - / - 288 / 65.706 / 4.481 - / - - / - - / - - / - - / 65.706 / 4.481 - / - - / - - / - - / - - / 65.706 / 11.202 - / - - / - - / - - / - - / 77.566 - Procurement Modification Item 1 of 2: INE - Depot A Kits Recurring INE - Depot:INSTALL KITS Group A (Active) Subtotal: Recurring Subtotal: INE - Depot Modification Item 2 of 2: INE - org / intermediate A Kits Recurring INE - org / intermediate:INSTALL KITS Group A (Active) Subtotal: Recurring Subtotal: INE - org / intermediate Subtotal: Procurement, All Modification Items - Support (All Modification Items) GROUP A: TOTAL NONRECURRING - / 4.428 / - - / - / - - / - PMA - Other Gov't Costs - / 7.083 - / 0.238 - / 0.100 - / 0.100 - / - - / 0.100 - / 0.100 - / - / - - / 0.585 - / 0.600 - / 1.294 - / - - / 1.294 - / 1.200 - / - / 11.511 - / 0.823 - / 0.700 - / 1.394 - / - - / 1.394 - / 1.300 - / - Change Orders Subtotal: Support - - / - - / - - - / - - / / 0.051 - / / 0.051 - / - - / - - / 4.428 / 0.122 - / - - / 7.794 / - - / - - / 0.122 - / - - / 3.679 / 15.901 Installation Modification Item 1 of 2: INE - Depot - / - - / - - / - - / - - / - - / - 12 / 0.000 24 / 0.000 24 / 0.000 12 / 0.000 - / - 72 / 0.000 Subtotal: Installation - / - - / - - / - - / - - / - - / - 12 / 0.000 24 / 0.000 24 / 0.000 12 / 0.000 - / - 72 / 0.000 9.959 12.502 0.000 0.051 0.122 0.000 93.467 Total Total Cost (Procurement + Support + Installation) LI MALCBG - Air Launch Cruise Missile (ALCM) Air Force 60.493 0.823 9.517 9.959 0.000 UNCLASSIFIED Page 5 of 11 P-1 Line #26 Volume 1 - 185 === page 216 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: MALCBG / Air Launch Cruise Missile (ALCM) Appropriation / Budget Activity / Budget Sub Activity: 3020F / 03 / 1 ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: 860108 / Inertial Navigation Element (INE) MDAP/MAIS Code: Modification Item 1 of 2: INE - Depot Manufacturer Information Manufacturer Name: Northrop Grumman Manufacturer Location: Salt Lake City, UT Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 12 FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Mar 2027 Mar 2028 Delivery Dates Mar 2028 Mar 2029 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Depot Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - 12 / 0.000 - / - - / - - / - 24 / 0.000 FY 2028 - / - - / - - / - - / - - / - - / - - / - 12 / 0.000 - / - 48 / 0.000 FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - 12 / 0.000 - / - Installation Cost 12 / 0.000 12 / 0.000 12 / 0.000 24 / 0.000 24 / 0.000 24 / 0.000 72 / 0.000 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 0 - - - - - - - - - - - - - - 6 6 6 6 6 6 6 6 6 6 6 6 - - 0 72 Out 0 - - - - - - - - - - - - - - 6 6 6 6 6 6 6 6 6 6 6 6 - - 0 72 LI MALCBG - Air Launch Cruise Missile (ALCM) Air Force UNCLASSIFIED Page 6 of 11 P-1 Line #26 Volume 1 - 186 === page 217 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F / 03 / 1 P-1 Line Item Number / Title: MALCBG / Air Launch Cruise Missile (ALCM) ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: 860108 / Inertial Navigation Element (INE) MDAP/MAIS Code: Modification Item 2 of 2: INE - org / intermediate Manufacturer Information Manufacturer Name: Northrop Grumman Manufacturer Location: Salt Lake City, UT Administrative Leadtime (in Months): 0 Dates FY 2025 Production Leadtime (in Months): 12 FY 2026 FY 2027 FY 2028 Contract Dates Mar 2026 Mar 2027 Mar 2028 Delivery Dates Mar 2027 Mar 2028 Mar 2029 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation (Organic): Org/Intermediate LI MALCBG - Air Launch Cruise Missile (ALCM) Air Force Installation Quantity: 288 UNCLASSIFIED Page 7 of 11 P-1 Line #26 Volume 1 - 187 === page 218 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F / 03 / 1 P-1 Line Item Number / Title: MALCBG / Air Launch Cruise Missile (ALCM) ID Code (A=Service Ready, B=Not Service Ready) : A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 860109 / Flight Data Transmitter MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - - 1.742 0.000 0.001 11.864 0.000 11.864 12.468 0.000 0.000 0.000 - 26.075 Total - - - - - - - - - - - - 1.742 0.000 0.001 11.864 0.000 11.864 12.468 0.000 0.000 0.000 - 26.075 - - - - - - - - - - - - 1.742 0.000 0.001 11.864 0.000 11.864 12.468 0.000 0.000 0.000 - 26.075 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: AF Long Range Planning required the service life of the Air Launched Cruise Missile (ALCM) to be extended through Long Range Standoff (LRSO) Full Operational Capability continued support for Air Force Global Strike Command (AFGSC) and United States Strategic Command (USSTRATCOM) requirements. In order to satisfy the life extension requirement, several phases of the Service Life Extension program (SLEP) were implemented, for a proactive approach. Through studies and surveillance and analysis programs, various components were identified as candidates for replacement due to aging and obsolescence issues before they become fleet-wide problems. This modification executes a remanufacture of the Flight Data Transmitter (FDT). The validated requirement for the FDT SLEP is AF 1067 AFGSC 19-018. The FDT measures rate of change in the ALCM attitude and provides data to the GMFC. Through analytical condition inspections and aging studies, the FDT was identified to have components that needed to be replaced in order to meet fleet-wide reliability and continued mission success. FDT has been executing preparatory work under support, however FY2028 begins actual kit procurement and initial installation. FY2027 efforts are for Phase 2 qualification. The ALCM cruise missile and its components are more than 30 years beyond their ten year service life. The non-recurring engineering of the FDT and update of the support equipment must happen in FY 2027 to ensure FDT procurement can start in FY 2028. If procurement is delayed, the reliability of the ALCM, the nation's sole nuclear cruise missile, will be jeopardized. The FDT kit will be issued via a Time Compliance Technical Order (TCTO). The remanufactured FDT TCTO will be available for installation at Hill AFB, Analytical Condition Inspection (ACI) at an annual rate of 24 kits. The FDT TCTO kit will also be available to the organizational-level maintenance units for installation at a rate of 70 per year in conjunction with scheduled maintenance activities. This effort is critical to meet AFGSC and USSTRATCOM operational needs. Funding adjustments made to reflect actual execution cost and future cost, reflecting variances from initial projections. Funds may be used to address emerging and short notice Diminishing Manufacturing and Material Shortage (DMSMS) issues. This modification supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Milestone/Development Status FDT is currently in Phase 2 qualification. This phase produces a tested/certified kit proof asset ready for production and validates the remanufacture approach to ensure readiness for production. LI MALCBG - Air Launch Cruise Missile (ALCM) Air Force UNCLASSIFIED Page 8 of 11 P-1 Line #26 Volume 1 - 188 === page 219 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: MALCBG / Air Launch Cruise Missile (ALCM) Appropriation / Budget Activity / Budget Sub Activity: 3020F / 03 / 1 ID Code (A=Service Ready, B=Not Service Ready) : A MDAP/MAIS Code: Models of Systems Affected: AGM-86B Modification Type: Service Life Extension Prior Years Financial Plan Modification Number / Title: 860109 / Flight Data Transmitter FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 2: FDT Kit - Depot A Kits Recurring - / - - / - - / - - / - - / - - / - 24 / 3.107 - / - - / - - / - - / - 24 / 3.107 Subtotal: Recurring FDT Kit - Depot:INSTALL KITS Group A (Active) - / - - / - - / - - / - - / - - / - - / 3.107 - / - - / - - / - - / - - / 3.107 Subtotal: FDT Kit - Depot - / - - / - - / - - / - - / - - / - - / 3.107 - / - - / - - / - - / - - / 3.107 Modification Item 2 of 2: FDT Kit - Organic A Kits Recurring - / - - / - - / - - / - - / - - / - 70 / 9.061 - / - - / - - / - - / - 70 / 9.061 Subtotal: Recurring FDT Kit - Organic:INSTALL KITS Group A (Active) - / - - / - - / - - / - - / - - / - - / 9.061 - / - - / - - / - - / - - Subtotal: FDT Kit - Organic - / - - / - - / - - / - - / - - / - - / 9.061 - / - - / - - / - - / - - - / - - / - - / - - / - - / - - / - / 12.168 - / - - / - - / - - / - - Subtotal: Procurement, All Modification Items - / 9.061 / 9.061 / 12.168 - Support (All Modification Items) GROUP A: TOTAL NONRECURRING PMA - Other Gov't Costs - SUPPORT-EQUIP Subtotal: Support - / - - / - / 1.742 - / - / - - / - / 1.742 - / - - / - - / 3.117 - / - - / 3.117 / 0.001 - / 0.247 - / - - / 0.247 / - - / 8.500 - / - - / 8.500 / 11.864 - / - / 0.001 - - - / 11.864 - / - - / - - / - - / - - / - - / 3.117 / 0.300 - / - - / - - / - - / - - / 2.290 / - - / - - / - - / - - / - - / 0.300 - / - - / - - / - - / - - / 8.500 / 13.907 Installation Modification Item 1 of 2: FDT Kit - Depot - / - - / - - / - - / - - / - - / - - / - 24 / 0.000 - / - - / - - / - 24 / 0.000 Subtotal: Installation - / - - / - - / - - / - - / - - / - - / - 24 / 0.000 - / - - / - - / - 24 / 0.000 - 26.075 Total Total Cost (Procurement + Support + Installation) LI MALCBG - Air Launch Cruise Missile (ALCM) Air Force 1.742 0.000 0.001 11.864 0.000 UNCLASSIFIED Page 9 of 11 11.864 12.468 0.000 P-1 Line #26 0.000 0.000 Volume 1 - 189 === page 220 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: MALCBG / Air Launch Cruise Missile (ALCM) Appropriation / Budget Activity / Budget Sub Activity: 3020F / 03 / 1 ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: 860109 / Flight Data Transmitter MDAP/MAIS Code: Modification Item 1 of 2: FDT Kit - Depot Manufacturer Information Manufacturer Name: Robins AFB Manufacturer Location: Warner Robins, GA Administrative Leadtime (in Months): 0 Dates Production Leadtime (in Months): 6 FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 Contract Dates Jun 2028 Delivery Dates Dec 2028 FY 2030 FY 2031 Installation Information Method of Implementation: Depot Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Prior Years - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2025 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2026 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2027 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - - / - 24 / 0.000 - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - Total - / - - / - - / - - / - - / - - / - - / - 24 / 0.000 - / - - / - - / - Installation Cost 24 / 0.000 24 / 0.000 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 0 - - - - - - - - - - - - - - - - 6 6 6 6 - - - - - - - - 0 24 Out 0 - - - - - - - - - - - - - - - - 6 6 6 6 - - - - - - - - 0 24 LI MALCBG - Air Launch Cruise Missile (ALCM) Air Force UNCLASSIFIED Page 10 of 11 P-1 Line #26 Volume 1 - 190 === page 221 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F / 03 / 1 P-1 Line Item Number / Title: MALCBG / Air Launch Cruise Missile (ALCM) ID Code (A=Service Ready, B=Not Service Ready) : A Modification Number / Title: 860109 / Flight Data Transmitter MDAP/MAIS Code: Modification Item 2 of 2: FDT Kit - Organic Manufacturer Information Manufacturer Name: Robins AFB Manufacturer Location: Warner Robins, GA Administrative Leadtime (in Months): 0 Dates FY 2025 Production Leadtime (in Months): 6 FY 2026 FY 2027 FY 2028 Contract Dates Jun 2028 Delivery Dates Dec 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation (Organic): Org/Intermediate LI MALCBG - Air Launch Cruise Missile (ALCM) Air Force Installation Quantity: 70 UNCLASSIFIED Page 11 of 11 P-1 Line #26 Volume 1 - 191 === page 222 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 192 === page 223 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 04: Spares and Repair Parts / BSA 10: Missile Spares and Repair Parts P-1 Line Item Number / Title: 00098A / Msl Sprs/Repair Parts (Initial) Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - - - - - 0.000 6.956 5.824 15.621 - 15.621 6.989 13.652 18.495 18.856 0.000 86.393 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Total - - - - - - - - - - - - 0.000 6.956 5.824 15.621 - 15.621 6.989 13.652 18.495 18.856 0.000 86.393 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) To FY 2031 Complete - - - - - - - - - - - - 0.000 6.956 5.824 15.621 - 15.621 6.989 13.652 18.495 18.856 0.000 86.393 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: AIM-260 Joint Advanced Tactical Missile (JATM) is an FY2027 new start MISSILE INITIAL SPARES. Missile Initial Spares are required to fill the initial spare parts pipeline or inventory for all new ballistic and non-ballistic missile systems, including modifications, support equipment, and other production categories. Initial spares include peculiar reparable and consumable components, assemblies, and subassemblies that must be available for issue at all levels of supply in time to support and maintain newly fielded end items. The FY 2026 spend plan amount for Missile procurement spares includes 5,824 thousand of discretionary and 1,400 thousand of mandatory (reconciliation) for a total of 7,224 thousand. Initial spares are funded in the two program segments described below. Working Capital Fund (WCF) Spares. Since FY 1994 most spares are purchased using obligation authority in the WCF. When the spares are delivered, this central procurement account reimburses the WCF. Types of spares in this program segment are Readiness Spares Packages, New Acquisition Spares, Modification Spares, Support Equipment, Other Production, and Consumables. Exempt Spares. This program segment finances spares that are not purchased through the WCF. The budget authority is a direct cite on the contract. Types of spares in this program segment are Contractor Logistics Support, Simulators/Trainers, Classified Equipment, and Munitions. The following Major Defense Acquisition Programs (MDAP) have funding in this line: AMRAAM, 185 AIM-9X Blk II, 442 JASSM, 555 LRASM, 449 This program has associated Research Development Test and Evaluation funding in PEs 11120F, 11213F, 27161F, 11122F,27172F, and 27163F. LI 00098A - Msl Sprs/Repair Parts (Initial) Air Force UNCLASSIFIED Page 1 of 3 P-1 Line #27 Volume 1 - 193 === page 224 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 04: Spares and Repair Parts / BSA 10: Missile Spares and Repair Parts ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 00098A / Msl Sprs/Repair Parts (Initial) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-18 Missile Spares/Repair Parts (Initial) P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 185 - / - - / 6.956 - / 5.824 - / 15.621 / 0.000 - / 6.956 - / 5.824 - / 15.621 - / 0.000 - / 15.621 / - - / 15.621 Title represents the P-18 Title for Spares. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: AGM-86 Air Launched Cruise Missile (ALCM): The FY 2027 ALCM funding request for initial spares supports multiple on-going Service Life Extension Programs (SLEPs) to ensure ALCM remains viable until replaced by the Long Range Stand Off (LRSO) missile. ALCM SLEP projects include SLEP 1 and component SLEPs for the Rotary Switch, Warhead Arming Device, Guided Missile Flight Control, W-10 cable, Fuze Assembly, Inertial Navigation Element, Flight Data Transmitter, Voltage Regulator and Elevon Actuator Controller. Joint Air-Surface Standoff Missile (JASSM): FY2027 JASSM missile initial spares program funds are required to fill the initial spares pipeline. Funding will procure critical initial spares for the JASSM and JASSM-ER programs. These parts include items such as seeker assemblies, missile control units (MCU), JASSM Anti-Jam GPS Receivers (JAGR), Electronic Safe and Arm Fuzes (ESAF), Bomb Impact Assessment (BIA) and other components to support and maintain fielded end items. These spares ensure JASSM meets Air Combat Command's materiel availability rates. Long Range Anti-Ship Missile (LRASM): FY2027 LRASM missile initial spares program funds are required to fill the initial spares pipeline. Funding will provide critical initial spare for the LRASM. These parts include items such as seeker assemblies, missile control units, LRASM Anti-Jam GPS receivers, electronic safe and arm fuzes, bomb impact assessment, and other components to support and maintain fielded end items. These spares ensure LRASM meets Air Combat Command's material availability rates. AIM-120 Advanced Medium Range Air to Air Missile: The FY 2027 request funds the procurement of components required to facilitate depot level post warranty repairs. AIM-9 Sidewinder/AIM-9X: FY 2027 funding for Missile Initial Spares program addresses depot level post warranty repairs. These spares are essential for repairs that do not have parts available MM III Modifications: No FY 2027 funding being requested SDB II: No FY 2027 funds are being requested AIM-260 Joint Advanced Tactical Missile (JATM): is an FY2027 new start. The details of this budget justification are classified, per Executive Order 13526, Sec 1.4 (a) and are submitted annually to Congress in the classified budget justification book. LI 00098A - Msl Sprs/Repair Parts (Initial) Air Force UNCLASSIFIED Page 2 of 3 P-1 Line #27 Volume 1 - 194 === page 225 === UNCLASSIFIED Date: April 2026 Exhibit P-18, Initial and Replenishment Spare and Repair Parts Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F / 04 / 10 End Item Line Item Number / Name [MDAP/MAIS] P-1 Line Item Number / Title: 00098A / Msl Sprs/Repair Parts (Initial) Prior Years FY 2025 ($ M) Title: Missile Spares/Repair Parts (Initial) FY 2026 ($ M) FY 2027 Base ($ M) ($ M) FY 2027 OOC ($ M) FY 2027 Total ($ M) Initial BA 04 - Spares and Repair Parts MALCBG / Air Launch Cruise Missile (ALCM) - 0.366 0.369 0.377 0.000 0.377 MAMRA0 / AMRAAM [185] - 2.336 2.350 2.404 0.000 2.404 JATM00 / Joint Advanced Tactical Missile Spares - - - 9.675 0.000 9.675 JASSM0 / JOINT AIR-SURFACE STANDOFF MISSILE - 1.017 1.015 0.506 0.000 0.506 LRASM / Long Range Anti-Ship Missile (LRASM) - - - 0.520 0.000 0.520 M09HAI / Sidewinder (AIM-9X) - 2.079 2.090 2.139 0.000 2.139 SDB002 / Small Diameter Bomb (SDB) - 1.158 - 0.000 0.000 0.000 Subtotal: Initial - 6.956 5.824 15.621 0.000 15.621 Total Cost (Initial + Replenishment) - 6.956 5.824 15.621 0.000 15.621 LI 00098A - Msl Sprs/Repair Parts (Initial) Air Force UNCLASSIFIED Page 3 of 3 P-1 Line #27 Volume 1 - 195 === page 226 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 196 === page 227 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 04: Spares and Repair Parts / BSA 10: Missile Spares and Repair Parts P-1 Line Item Number / Title: 00098K / Msl Sprs/Repair Parts (Replen) Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years 0.000 0.000 0.000 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 104.194 104.194 104.194 108.249 108.249 108.249 123.224 123.224 123.224 - 123.224 114.823 123.224 114.823 123.224 114.823 94.118 94.118 94.118 124.730 124.730 124.730 To FY 2031 Complete 136.575 136.575 136.575 Total 0.000 805.913 0.000 805.913 0.000 805.913 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Program Description: MISSILE REPLENISHMENT SPARES. The Missile Replenishment Spares program funds all ballistic and non-ballistic missile replenishment spares. The replenishment and repair spare parts are needed to support and maintain ballistic and non-ballistic missile systems. Replenishment spares include such items as rocket motors, cables, telemetry packages, and electronic components. Procurements will include spares with long production lead items. The following Major Defense Acquisition Programs (MDAP) have funding in this line: AMRAAM, 185 SDB II, 439 AIM-9X Blk II, 442 MM III, 401 This program has associated Research Development Test and Evaluation funding in PEs 11120F, 11213F, 27161F, 11122F, and 27163F. The MM III FY25 rescission of $13.643M is not reflected in this budget documentation. LI 00098K - Msl Sprs/Repair Parts (Replen) Air Force UNCLASSIFIED Page 1 of 3 P-1 Line #28 Volume 1 - 197 === page 228 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 04: Spares and Repair Parts / BSA 10: Missile Spares and Repair Parts ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 00098K / Msl Sprs/Repair Parts (Replen) Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-18 Msl Sprs/Repair Parts (Replen) P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 104.194 - / 108.249 - / 123.224 / 0.000 - / 104.194 - / 108.249 - / 123.224 - / 0.000 - / 123.224 / - - / 123.224 Title represents the P-18 Title for Spares. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: AGM-86 Air Launched Cruise Missile (ALCM): The FY 2027 ALCM funding request for replenishment spares supports multiple on-going Service Life Extension Programs (SLEPs) to ensure ALCM remains viable until replaced by the Long Range Stand Off (LRSO) missile. ALCM SLEP projects include SLEP 1 and component SLEPs for the Rotary Switch, Warhead Arming Device, Guided Missile Flight Control, W-10 cable, Fuze Assembly, Inertial Navigation Element, Flight Data Transmitter, Voltage Regulator and Elevon Actuator Controller. MM III Modifications: FY2027 replenishment spares funding will specifically procure items such as batteries, ordnance cables, antenna kits, telemetry packages, torque motors, and other electronic components supporting weapon system operations and operational test launches. The flight test, telemetry, and termination (FT3) program is also delivering kits with this funding. FT3 wafers enable Minuteman Flight tests which provide aging surveillance data critical to sustaining weapon system reliability ratings. These flight tests also demonstrate the United States' nuclear force capability, strengthening deterrence. FY2027 minor funding increase to align kit delivery schedule with flight test. The FT3 program consistently ensures FT3 systems are operational and ready for launch, resulting in 10 successful Air Force Global Strike Command (AFGSC) Minuteman III (MMIII) Operational Test Launch (OTL) missions to date. AIM-9 Sidewinder/AIM-9X: FY 2027 funding for Missile Replenishment Spares program funds repairs for CATMs and AURs. These repairs include items such as live and inert batteries, Control Actuation System (CAS) and Inert Measurement Units. HARM - FY 2027 funding is critical to the procurement of High-speed Anti-Radiation Missile (HARM) spare parts in support of Raytheon Missiles Defense System Factory repair of the Control and Guidance Sections for the AGM-88B/C/F All-Up-Rounds. AGM-88 missile is critical for the Suppression of Enemy Air Defenses. Additionally, funding is used for the procurement of Telemetry Sections used in Combat Air Forces Pilot Training and New Threat Analysis. SDB I - FY2027 Spares funds are required to support SDB I Guided Test Vehicles (GTV) modernization for the Weapon System Evaluation Program (WSEP). Spares funding will procure major sub-components such as flight termination and telemetry kits, and flight test recorders, to replace obsolete parts and convert GBU-39/B's into SDB I GTVs. Hellfire - FY2027 HELLFIRE missile replenishment spares funding is used to purchase parts not covered by warranty. The parts are used to support Industrial Base missile repairs completed by Lockheed Martin. AIM-120 Advanced Medium Range Air to Air Missile: The FY2027 Missile Replenishment Spares program funds AMRAAM field unit repairs and intermediate level repairs on Captive Air Training Missiles (CATM). These repairs include such items as filter rectifiers, harness assemblies, wings and fins. LI 00098K - Msl Sprs/Repair Parts (Replen) Air Force UNCLASSIFIED Page 2 of 3 P-1 Line #28 Volume 1 - 198 === page 229 === UNCLASSIFIED Date: April 2026 Exhibit P-18, Initial and Replenishment Spare and Repair Parts Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F / 04 / 10 End Item Line Item Number / Name [MDAP/MAIS] P-1 Line Item Number / Title: 00098K / Msl Sprs/Repair Parts (Replen) Prior Years FY 2025 ($ M) Title: Msl Sprs/Repair Parts (Replen) FY 2026 ($ M) FY 2027 Base ($ M) ($ M) FY 2027 OOC ($ M) FY 2027 Total ($ M) Replenishment BA 04 - Spares and Repair Parts MALCBG / AGM-86 Air Launched Cruise Missile (ALCM) - M88AAG / AGM-88A Tactical AGM Missile (HARM) - 6.890 M09HAI / AIM-9X - 16.798 M30MLG / LGM-30 MINUTEMAN (MM III) - 74.756 MAMRA0 / MAMRA0 - AIM-120 Advanced Medium Range Air to Air Missile (AMRAAM) - 1.323 PRDTA2 / Predator Hellfire Missile - 0.247 SDB000 / Small Diameter Bomb - 2.247 Subtotal: Replenishment - 104.194 Total Cost (Initial + Replenishment) - 104.194 LI 00098K - Msl Sprs/Repair Parts (Replen) Air Force 1.933 UNCLASSIFIED Page 3 of 3 2.648 3.406 0.000 6.926 7.081 0.000 7.081 16.888 17.257 0.000 17.257 71.500 77.186 0.000 77.186 0.977 1.301 0.000 1.301 - 0.457 0.000 0.457 9.310 16.536 0.000 16.536 108.249 123.224 0.000 123.224 108.249 123.224 0.000 123.224 P-1 Line #28 3.406 Volume 1 - 199 === page 230 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 200 === page 231 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3020F: Missile Procurement, Air Force / BA 05: Other Support / BSA 4: Special Programs ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: MSPPRG / Special Update Programs Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) - Gross/Weapon System Cost ($ in Millions) - Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) - Plus CY Advance Procurement ($ in Millions) - Total Obligation Authority ($ in Millions) - FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 628.436 628.436 628.436 221.199 221.199 221.199 168.578 168.578 168.578 - 168.578 168.578 168.578 482.008 898.701 482.008 898.701 482.008 898.701 1,247.811 1,247.811 1,247.811 To FY 2031 Complete 1,193.682 1,193.682 1,193.682 - Total 4,840.415 4,840.415 4,840.415 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: This program is reported in accordance with Title 10, United States Code, Section 119(a)(1) in the Special Access Program Annual Report to Congress. Justification: This program is reported in accordance with Title 10, United States Code, Section 119(a)(1) in the Special Access Program Annual Report to Congress. LI MSPPRG - Special Update Programs Air Force UNCLASSIFIED Page 1 of 1 P-1 Line #30 Volume 1 - 201 === page 232 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 202