=== page 1 === UNCLASSIFIED Department of War Fiscal Year (FY) 2027 Budget Estimates April 2026 Air Force Justification Book Volume 1 of 1 Aircraft Procurement, Air Force Vol 1 UNCLASSIFIED === page 2 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED === page 3 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Table of Volumes Air Force - 3010................................................................................................................................................................. Volume 1 UNCLASSIFIED Volume 1 - i === page 4 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - ii === page 5 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Volume 1 Table of Contents Introduction and Explanation of Contents................................................................................................................Volume 1 - v Comptroller Exhibit P-1.............................................................................................................................................Volume 1 - vii Master Line Item Table of Contents (by Appropriation then Line Number)........................................................Volume 1 - xix Master Line Item Table of Contents (Alphabetically by Line Item Title)............................................................Volume 1 - xxiii Executive Summary...............................................................................................................................................Volume 1 - xxvii Acronyms................................................................................................................................................................ Volume 1 - xxix Exhibit P-40s................................................................................................................................................................ Volume 1 - 1 UNCLASSIFIED Volume 1 - iii === page 6 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - iv === page 7 === UNCLASSIFIED Appropriation Language Fiscal Year (FY) 2027 President’s Budget Aircraft Procurement, Air Force For construction, procurement, and modification of aircraft and equipment, including armor and armament, specialized ground handling equipment, and training devices, spare parts, and accessories therefor; specialized equipment; expansion of public and private plants, Government-owned equipment and installation thereof in such plants, erection of structures, and acquisition of land, for the foregoing purposes, and such lands and interests therein, may be acquired, and construction prosecuted thereon prior to approval of title; reserve plant and Government and contractor-owned equipment layaway; and other expenses necessary for the foregoing purposes including rents and transportation of things, $26,985,236,000, to remain available for obligation until September 30, 2029, of which $407,836,000 shall be available for the Air National Guard and the Air Force Reserve. UNCLASSIFIED Volume 1 - v === page 8 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - vi === page 9 === UNCLASSIFIED Department Of War FY 2027 President's Budget Exhibit P-1 Total Obligation Authority DoW Component Summary (Dollars in Thousands) FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total Appropriation Summary FY 2025 Actuals Aircraft Procurement, Air Force 19,792,490 19,964,954 10,171,671 30,136,625 26,985,236 3,655,951 30,641,187 Total Department of the Air Force 19,792,490 19,964,954 10,171,671 30,136,625 26,985,236 3,655,951 30,641,187 Grand Total Department Of War 19,792,490 19,964,954 10,171,671 30,136,625 26,985,236 3,655,951 30,641,187 UNCLASSIFIED Volume 1 - vii === page 10 === UNCLASSIFIED Department Of the Air Force FY 2027 President's Budget Exhibit P-1 Total Obligation Authority Air Force Summary (Dollars in Thousands) FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total Appropriation Summary FY 2025 Actuals Aircraft Procurement, Air Force 19,792,490 19,964,954 10,171,671 30,136,625 26,985,236 3,655,951 30,641,187 19,792,490 19,964,954 10,171,671 30,136,625 26,985,236 3,655,951 30,641,187 Total Department of the Air Force UNCLASSIFIED Volume 1 - viii === page 11 === UNCLASSIFIED Department Of the Air Force FY 2027 President's Budget Exhibit P-1 Total Obligation Authority 3010F Budget Activity Summary (Dollars in Thousands) Appropriation: Aircraft Procurement, Air Force FY 2025 Actuals FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan FY 2026 Total FY 2027 Discretionary Request FY 2027 Mandatory Request FY 2027 Total 2,338,058 12,562,605 Budget Activity 01. Combat aircraft 9,381,454 7,404,719 7,306,792 14,711,511 10,224,547 02. Airlift aircraft 3,193,623 3,940,974 287,060 4,228,034 4,157,210 4,157,210 03. Trainer aircraft 20,780 362,083 362,083 599,154 599,154 04. Other aircraft 914,044 988,389 210,300 1,198,689 1,240,988 1,240,988 05. Modification of inservice aircraft 3,406,544 4,300,085 1,027,199 5,327,284 6,205,122 185,600 6,390,722 06. Aircraft spares and repair parts 982,491 1,193,535 1,030,740 2,224,275 1,441,052 1,132,293 2,573,345 07. Aircraft support equipment and facilities 1,893,554 1,775,169 309,580 2,084,749 3,117,163 Total Aircraft Procurement, Air Force 19,792,490 19,964,954 10,171,671 30,136,625 26,985,236 UNCLASSIFIED 3,117,163 3,655,951 30,641,187 Volume 1 - ix === page 12 === UNCLASSIFIED Department Of the Air Force FY 2027 President's Budget Exhibit P-1 Total Obligation Authority 3010F Detail (Dollars in Thousands) Appropriation: 3010 Aircraft Procurement, Air Force Line No Item Nomenclature FY 2025 Actuals Ident Code Qty Cost FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan Qty Qty Cost FY 2026 Total Qty Cost FY 2027 Discretionary Request Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Budget Activity 01: Combat aircraft Strategic Offensive 1 B-21 Raider A (2,586,868) Less: Advance Procurement (PY) (4,500,000) (-708,000) 1,878,868 2 4,500,000 (7,191,616) (3,092,615) (3,092,615) (-721,600) (-862,000) (-862,000) 6,470,016 2,230,615 2,230,615 862,000 1,005,667 1,005,667 (1,005,667) (1,005,667) B-21 Raider Advance Procurement (CY) 721,600 C (FY 2025 for FY 2026) (M) (721,600) C (FY 2026 for FY 2027) (M) (862,000) C (FY 2027 for FY 2028) (M) Tactical Forces 3 F-35 A Less: Advance Procurement (PY) 4 40 (4,808,515) 24 24 (4,323,677) 24 (2,942,679) 14 (2,338,058) 38 (5,280,737) (-318,585) (-410,200) (-548,956) 4,489,930 3,913,477 2,393,723 (-548,956) 482,584 531,241 738,103 738,103 C (FY 2027 for FY 2028) (M) (657,934) (657,934) C (FY 2027 for FY 2029) (M) (80,169) (80,169) 996,528 996,528 2,338,058 4,731,781 F-35 Advance Procurement (CY) C (FY 2025 for FY 2026) (M) (410,200) C (FY 2025 for FY 2027) (M) (72,384) C (FY 2026 for FY 2027) (M) (476,572) C (FY 2026 for FY 2028) (M) (54,669) 5 Collaborative Combat Aircraft 6 Collaborative Combat Aircraft A UNCLASSIFIED Volume 1 - x === page 13 === UNCLASSIFIED Department Of the Air Force FY 2027 President's Budget Exhibit P-1 Total Obligation Authority 3010F Detail (Dollars in Thousands) Appropriation: 3010 Aircraft Procurement, Air Force Line No Item Nomenclature FY 2025 Actuals Ident Code Qty Cost FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan Qty Qty Cost FY 2026 Total Qty Cost FY 2027 Discretionary Request Qty Advance Procurement (CY) C (FY 2027 for FY 2028) (M) 7 F-15EX A 18 Less: Advance Procurement (PY) 9 Joint Simulation Environment (2,036,472) 1 21 (2,806,792) 22 (2,921,792) 24 Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 150,500 150,500 (150,500) (150,500) (2,656,716) 24 (2,656,716) (-228,000) 1,808,472 2,806,792 2,921,792 12,985 52,695 9,381,454 7,306,792 14,711,511 10,224,547 A Total Combat aircraft 2,656,716 2,656,716 52,695 2,338,058 12,562,605 Budget Activity 02: Airlift aircraft Tactical Airlift 10 KC-46A MDAP A 15 A 1 2,779,618 15 414,005 7 15 2,749,974 15 3,520,530 15 3,520,530 Other Airlift 11 C-130J Total Airlift aircraft 1 3,193,623 287,060 8 287,060 1,478,060 636,680 636,680 4,228,034 4,157,210 4,157,210 Budget Activity 03: Trainer aircraft UPT Trainers 12 Advanced Pilot Training T-7A 13 Advanced Pilot Training T-7A A 20,780 14 14 362,083 Advance Procurement (CY) C (FY 2027 for FY 2028) (M) Total Trainer aircraft 20,780 362,083 23 529,464 23 529,464 69,690 69,690 (69,690) (69,690) 599,154 599,154 Budget Activity 04: Other aircraft UNCLASSIFIED Volume 1 - xi === page 14 === UNCLASSIFIED Department Of the Air Force FY 2027 President's Budget Exhibit P-1 Total Obligation Authority 3010F Detail (Dollars in Thousands) Appropriation: 3010 Aircraft Procurement, Air Force Line No Item Nomenclature FY 2025 Actuals Ident Code Qty Cost FY 2026 Discretionary Enacted FY 2026 PL 119-21 Spend Plan Qty Qty Cost FY 2026 Total Qty Cost FY 2027 Discretionary Request Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Helicopters 14 MH-139A A 8 279,095 2 15 Combat Rescue Helicopter A 4 355,185 2 6 210,300 8 277,728 2 207,500 4 252,949 4 69,395 252,949 69,395 Mission Support Aircraft 16 C-37A A 17 C-40 Fleet Expansion A 10,000 18 Civil Air Patrol A/C A 15,000 5,900 1 1 1 208,000 1 208,000 250,000 17,800 3,219 3,219 Other Aircraft 19 Pale Ale A 20 Target Drones A 21 Compass Call A E-7 A 22 14 37,581 20 20 34,224 10 31,912 10 31,912 2 2 400,000 3 660,000 3 660,000 15,513 6 200,000 Less: Advance Procurement (PY) 23 (-200,000) E-7 Advance Procurement (CY) 200,000 C (FY 2025 for FY 2026) (M) 24 RQ-20B Puma Total Other aircraft (200,000) A 6 11,283 6 914,044 6 210,300 UNCLASSIFIED 11,437 1,198,689 6 1,240,988 15,513 1,240,988 Volume 1 - xii === page 15 === UNCLASSIFIED Department Of the Air Force FY 2027 President's Budget Exhibit P-1 Total Obligation Authority 3010F Detail (Dollars in Thousands) Appropriation: 3010 Aircraft Procurement, Air Force Line No Item Nomenclature FY 2025 Actuals Ident Code Qty Cost FY 2026 Discretionary Enacted Qty FY 2026 PL 119-21 Spend Plan Qty Cost FY 2026 Total Qty Cost FY 2027 Discretionary Request Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Budget Activity 05: Modification of inservice aircraft Strategic Aircraft 25 B-2A A 60,707 76,906 178,668 178,668 26 B-1B A 13,406 73,893 146,862 146,862 27 B-52 A 77,527 158,234 422,399 28 Large Aircraft Infrared Countermeasures A 52,117 35,165 66,638 66,638 15,948 822 822 23,600 445,999 Tactical Aircraft 29 Collaborative Combat Aircraft Mods A 30 E-11 BACN/HAG A 72,387 28,797 31 F-15 A 38,247 102,168 140,204 140,204 32 F-15EX A 224,350 224,350 214,176 214,176 33 F-16 Modifications A 194,805 92,500 509,126 946,747 946,747 34 F-22A A 817,256 96,000 1,041,526 1,052,088 1,052,088 35 F-35 Modifications A 394,454 277,264 335,973 36 F-15 EPAW A 227,342 213,872 141,233 141,233 37 KC-46A MDAP A 24,954 19,344 85,515 85,515 900 UNCLASSIFIED 162,000 497,973 Volume 1 - xiii === page 16 === UNCLASSIFIED Department Of the Air Force FY 2027 President's Budget Exhibit P-1 Total Obligation Authority 3010F Detail (Dollars in Thousands) Appropriation: 3010 Aircraft Procurement, Air Force Line No Item Nomenclature FY 2025 Actuals Ident Code Qty Cost FY 2026 Discretionary Enacted Qty FY 2026 PL 119-21 Spend Plan Qty Cost FY 2026 Total Qty Cost FY 2027 Discretionary Request Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost Airlift Aircraft 38 C-5 A 43,370 39 C-17A A 85,674 40 C-32A A 6,422 41 C-37A A 9,146 42 OSA-EA Modifications A 114,640 25,878 10,308 10,308 124,493 59,867 59,867 50,850 136,786 136,786 Trainer Aircraft 43 Glider Mods A 2,679 159 164 164 44 T-6 A 49,281 135,988 131,747 131,747 45 T-1 A 2,205 137 46 T-38 A 112,650 85,381 84,452 84,452 297 297 44,041 23,546 23,546 173,840 315,308 315,308 Other Aircraft 47 U-2 Mods 48 VC-25A Mod A 11,388 49 C-40 A 7,114 50 C-130 A 28,257 51 C-130J Mods A 161,086 32,840 UNCLASSIFIED Volume 1 - xiv === page 17 === UNCLASSIFIED Department Of the Air Force FY 2027 President's Budget Exhibit P-1 Total Obligation Authority 3010F Detail (Dollars in Thousands) Appropriation: 3010 Aircraft Procurement, Air Force Line No Item Nomenclature FY 2025 Actuals Ident Code Qty Cost FY 2026 Discretionary Enacted Qty FY 2026 PL 119-21 Spend Plan Qty Cost FY 2026 Total Qty Cost FY 2027 Discretionary Request Qty FY 2027 Mandatory Request Cost Qty Cost FY 2027 Total Qty Cost 52 C-135 A 111,647 41,000 165,368 158,715 158,715 53 Compass Call A 94,654 334,969 469,204 506,265 506,265 54 CVR (Connon ULF Receiver) Inc 2 A 18 18 55 RC-135 A 242,066 256,001 252,846 252,846 56 E-3 A 68,192 17,291 841 841 57 E-4 A 24,828 45,232 30,779 30,779 58 H-1 A 2,097 17,899 17,872 17,872 59 MH-139A Mod A 5,010 4,992 5,021 5,021 60 H-60 A 2,035 1,749 61 HH60W Modifications A 18,911 9,150 46,662 46,662 62 HC/MC-130 Modifications A 208,461 365,086 257,742 257,742 63 Other Aircraft A 55,122 263,902 102,052 102,052 64 MQ-9 Mods A 12,351 100,923 105,966 105,966 65 Software Defined User Equipment B 25,847 25,847 66 Senior Leader C3 System - Aircraft A 32,654 32,654 23,501 24,414 UNCLASSIFIED Volume 1 - xv === page 18 === UNCLASSIFIED Department Of the Air Force FY 2027 President's Budget Exhibit P-1 Total Obligation Authority 3010F Detail (Dollars in Thousands) Appropriation: 3010 Aircraft Procurement, Air Force FY 2025 Actuals Line No Item Nomenclature Ident Code CV-22 Mods A 67 Qty Total Modification of inservice aircraft Cost FY 2026 Discretionary Enacted Qty FY 2026 PL 119-21 Spend Plan Qty Cost FY 2026 Total Qty Cost FY 2027 Discretionary Request Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 45,195 90,000 168,713 168,042 3,406,544 1,027,199 5,327,284 6,205,122 185,600 6,390,722 168,042 982,491 23,940 1,217,475 1,441,052 1,132,293 2,573,345 1,000,000 1,000,000 1,132,293 2,573,345 Budget Activity 06: Aircraft spares and repair parts Aircraft Spares and Repair Parts 68 Initial Spares/Repair Parts A 69 F-35 A 70 F-16 A Total Aircraft spares and repair parts 982,491 6,800 6,800 1,030,740 2,224,275 1,441,052 156,776 252,808 252,808 18,969 95,457 95,457 Budget Activity 07: Aircraft support equipment and facilities Common Support Equipment 71 Aircraft Replacement Support Equip A 162,813 Post Production Support 72 B-2A A 1,885 73 B-2B A 15,709 74 B-52 A 111 114 114 75 C-17A A 2,672 3,027 3,027 76 CV-22 Post Production Support A 5,088 5,088 9,604 UNCLASSIFIED Volume 1 - xvi === page 19 === UNCLASSIFIED Department Of the Air Force FY 2027 President's Budget Exhibit P-1 Total Obligation Authority 3010F Detail (Dollars in Thousands) Appropriation: 3010 Aircraft Procurement, Air Force Line No Item Nomenclature FY 2025 Actuals Ident Code Qty Cost FY 2026 Discretionary Enacted Qty 77 Compass Call Post Prod A 78 F-15 A 79 F-15EX A 80 F-16 Post Production Support A 62,368 81 HC/MC-130 Post Prod A 18,604 82 Joint Simulation Environment Post Production Support A 83 MQ-9 Post Prod A FY 2026 PL 119-21 Spend Plan Qty Cost 25,200 FY 2026 Total Qty Cost FY 2027 Discretionary Request Qty Cost FY 2027 Mandatory Request Qty Cost FY 2027 Total Qty Cost 25,200 5,112 5,200 16,930 16,930 23,602 57,781 57,781 17,986 20,415 20,415 15,365 15,365 28,524 Industrial Preparedness 84 Industrial Responsiveness A 20,004 19,998 20,590 20,590 A 25,908 26,323 85,387 85,387 279,180 1,741,470 2,528,401 2,528,401 18,006 15,800 15,800 309,580 2,084,749 3,117,163 3,117,163 War Consumables 85 War Consumables Other Production Charges 86 Other Production Charges A 1,559,926 88 Cancelled Acct Adjustments A 374 Total Aircraft support equipment and facilities 1,893,554 Classified Programs 999 Classified Programs 16,359 UNCLASSIFIED Volume 1 - xvii === page 20 === UNCLASSIFIED Department Of the Air Force FY 2027 President's Budget Exhibit P-1 Total Obligation Authority 3010F Detail (Dollars in Thousands) Appropriation: 3010 Aircraft Procurement, Air Force Line No Item Nomenclature Total Aircraft Procurement, Air Force FY 2025 Actuals Ident Code Qty Cost FY 2026 Discretionary Enacted Qty FY 2026 PL 119-21 Spend Plan Qty 19,792,490 Cost 10,171,671 UNCLASSIFIED FY 2026 Total Qty Cost 30,136,625 FY 2027 Discretionary Request Qty Cost 26,985,236 FY 2027 Mandatory Request Qty Cost 3,655,951 FY 2027 Total Qty Cost 30,641,187 Volume 1 - xviii === page 21 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Master Line Item Table of Contents (by Appropriation then Line Number) Appropriation 3010F: Aircraft Procurement, Air Force Line # BA BSA Line Item Number Line Item Title Page 1 01 01 B02100 B-21 Raider AP......................................................................................................................................Volume 1 - 1 2 01 01 B02100 B-21 Raider AP, Advance Procurement................................................................................................ Volume 1 - 5 3 01 03 ATA000 F-35........................................................................................................................................................ Volume 1 - 9 4 01 03 ATA000 F-35, Advance Procurement................................................................................................................ Volume 1 - 21 5 01 03 CCA000 Collaborative Combat Aircraft AP........................................................................................................ Volume 1 - 25 6 01 03 CCA000 Collaborative Combat Aircraft AP, Advance Procurement...................................................................Volume 1 - 29 7 01 03 F015EX F-15EX................................................................................................................................................. Volume 1 - 33 9 01 03 JSE000 Joint Simulation Environment.............................................................................................................. Volume 1 - 45 Appropriation 3010F: Aircraft Procurement, Air Force Line # BA BSA Line Item Number Line Item Title Page 10 02 02 KC046A KC-46A MDAP..................................................................................................................................... Volume 1 - 53 11 02 03 C130J0 C-130J..................................................................................................................................................Volume 1 - 69 UNCLASSIFIED Volume 1 - xix === page 22 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Appropriation 3010F: Aircraft Procurement, Air Force Line # BA BSA Line Item Number Line Item Title Page 12 03 01 APT000 Advanced Pilot Training T-7A AP........................................................................................................ Volume 1 - 73 13 03 01 APT000 Advanced Pilot Training T-7A AP, Advance Procurement...................................................................Volume 1 - 81 Appropriation 3010F: Aircraft Procurement, Air Force Line # BA BSA Line Item Number Line Item Title Page 14 04 01 H0106O MH-139A.............................................................................................................................................. Volume 1 - 85 15 04 01 H060WH Combat Rescue Helicopter.................................................................................................................. Volume 1 - 95 16 04 04 C03700 C-37A................................................................................................................................................. Volume 1 - 109 17 04 04 C0400D C-40 Fleet Expansion........................................................................................................................ Volume 1 - 113 18 04 04 CAPAC0 Civil Air Patrol A/C............................................................................................................................. Volume 1 - 115 20 04 05 10TRGT Target Drones.................................................................................................................................... Volume 1 - 117 21 04 05 CALL00 Compass Call.....................................................................................................................................Volume 1 - 127 22 04 05 E00700 E-7......................................................................................................................................................Volume 1 - 131 23 04 05 E00700 E-7, Advance Procurement......................................................................................................................................... UNCLASSIFIED Volume 1 - xx === page 23 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Appropriation 3010F: Aircraft Procurement, Air Force Line # BA BSA Line Item Number Line Item Title 24 04 05 RQ-20B Puma....................................................................................................................................Volume 1 - 133 Q020BR Page Appropriation 3010F: Aircraft Procurement, Air Force Line # BA BSA Line Item Number Line Item Title 68 06 10 Initial Spares/Repair Parts................................................................................................................. Volume 1 - 135 000999 Page Appropriation 3010F: Aircraft Procurement, Air Force Line # BA BSA Line Item Number Line Item Title Page 71 07 01 000071 Aircraft Replacement Support Equip................................................................................................. Volume 1 - 139 72 07 02 B00200 B-2A................................................................................................................................................... Volume 1 - 147 73 07 02 B002B0 B-2B................................................................................................................................................... Volume 1 - 183 74 07 02 B05200 B-52....................................................................................................................................................Volume 1 - 185 75 07 02 C01700 C-17A................................................................................................................................................. Volume 1 - 189 76 07 02 C0V220 CV-22 Post Production Support.........................................................................................................Volume 1 - 191 UNCLASSIFIED Volume 1 - xxi === page 24 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Appropriation 3010F: Aircraft Procurement, Air Force Line # BA BSA Line Item Number Line Item Title Page 78 07 02 F01500 F-15.................................................................................................................................................... Volume 1 - 193 79 07 02 F015EX F-15EX............................................................................................................................................... Volume 1 - 197 80 07 02 F0160P F-16 Post Production Support........................................................................................................... Volume 1 - 199 81 07 02 HCMC00 HC/MC-130 Post Prod....................................................................................................................... Volume 1 - 203 82 07 02 JSE000 Joint Simulation Environment Post Production Support.................................................................... Volume 1 - 207 83 07 02 PRDTB5 MQ-9 Post Prod................................................................................................................................. Volume 1 - 211 84 07 03 000073 Industrial Responsiveness................................................................................................................. Volume 1 - 213 85 07 04 000074 War Consumables..............................................................................................................................Volume 1 - 217 86 07 05 000075 Other Production Charges................................................................................................................. Volume 1 - 221 UNCLASSIFIED Volume 1 - xxii === page 25 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Master Line Item Table of Contents (Alphabetically by Line Item Title) Line Item Title Line Item Number Line # BA BSA Page Advanced Pilot Training T-7A AP APT000 12 03 01..................... Volume 1 - 73 Advanced Pilot Training T-7A AP, Advance Procurement APT000 13 03 01..................... Volume 1 - 81 Aircraft Replacement Support Equip 000071 71 07 01................... Volume 1 - 139 B-21 Raider AP B02100 1 01 01....................... Volume 1 - 1 B-21 Raider AP, Advance Procurement B02100 2 01 01....................... Volume 1 - 5 B-2A B00200 72 07 02................... Volume 1 - 147 B-2B B002B0 73 07 02................... Volume 1 - 183 B-52 B05200 74 07 02................... Volume 1 - 185 C-130J C130J0 11 02 03..................... Volume 1 - 69 C-17A C01700 75 07 02................... Volume 1 - 189 C-37A C03700 16 04 04................... Volume 1 - 109 C-40 Fleet Expansion C0400D 17 04 04................... Volume 1 - 113 CV-22 Post Production Support C0V220 76 07 02................... Volume 1 - 191 Civil Air Patrol A/C CAPAC0 18 04 04................... Volume 1 - 115 Collaborative Combat Aircraft AP CCA000 5 01 03..................... Volume 1 - 25 Collaborative Combat Aircraft AP, Advance Procurement CCA000 6 01 03..................... Volume 1 - 29 Combat Rescue Helicopter H060WH 15 04 01..................... Volume 1 - 95 UNCLASSIFIED Volume 1 - xxiii === page 26 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page Compass Call CALL00 21 04 05................... Volume 1 - 127 E-7 E00700 22 04 05................... Volume 1 - 131 E-7, Advance Procurement E00700 23 04 05............................................ F-15 F01500 78 07 02................... Volume 1 - 193 F-15EX F015EX 7 01 03..................... Volume 1 - 33 F-15EX F015EX 79 07 02................... Volume 1 - 197 F-16 Post Production Support F0160P 80 07 02................... Volume 1 - 199 F-35 ATA000 3 01 03....................... Volume 1 - 9 F-35, Advance Procurement ATA000 4 01 03..................... Volume 1 - 21 HC/MC-130 Post Prod HCMC00 81 07 02................... Volume 1 - 203 Industrial Responsiveness 000073 84 07 03................... Volume 1 - 213 Initial Spares/Repair Parts 000999 68 06 10................... Volume 1 - 135 Joint Simulation Environment JSE000 9 01 03..................... Volume 1 - 45 Joint Simulation Environment Post Production Support JSE000 82 07 02................... Volume 1 - 207 KC-46A MDAP KC046A 10 02 02..................... Volume 1 - 53 MH-139A H0106O 14 04 01..................... Volume 1 - 85 MQ-9 Post Prod PRDTB5 83 07 02................... Volume 1 - 211 Other Production Charges 000075 86 07 05................... Volume 1 - 221 RQ-20B Puma Q020BR 24 04 05................... Volume 1 - 133 Target Drones 10TRGT 20 04 05................... Volume 1 - 117 UNCLASSIFIED Volume 1 - xxiv === page 27 === UNCLASSIFIED Air Force • Budget Estimates FY 2027 • Procurement Line Item Title Line Item Number Line # BA BSA Page War Consumables 000074 85 07 04................... Volume 1 - 217 UNCLASSIFIED Volume 1 - xxv === page 28 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - xxvi === page 29 === Executive Summary for Aircraft Procurement, Air Force Table 1: Funding Overview FY 2025 ($K) FY 2026 ($K) FY 2027 ($K) Discretionary $19,792,490 $19,964,954 $26,985,236 Mandatory $0 $10,171,671 $3,655,951 $19,792,490 $30,136,625 $30,641,187 Total Table 2: Detailed Mandatory Breakout BLI Reconciliation Bin Title FY 2025 ($K) FY 2026 ($K) 000075 Air Superiority $279,180 000999 Air Superiority $23,940 000999 Air Superiority ATA000 Readiness ATA000 Air Superiority FY 2027 ($K) $1,132,293 $1,000,000 $2,338,058 B02100 Nuclear B05200 Air Superiority $4,500,000 C01700 Air Superiority $111,590 C01700 Low-Cost Weapons $3,050 C1300J Air Superiority $7,940 C1300J Low-Cost Weapons $24,900 C130J0 Air Superiority $287,060 C13500 Air Superiority $41,000 CALL00 Air Superiority $334,969 CALL00 Air Superiority $25,200 $23,600 Volume 1 - xxvii === page 30 === CCA00M Air Superiority $900 F015EX Air Superiority $3,031,142 F01600 Air Superiority $6,800 F01600 Air Superiority $92,500 F0160P Air Superiority $5,200 F02200 Air Superiority $96,000 F03500 Air Superiority H0106O Nuclear $210,300 V02200 Readiness $90,000 Mandatory Total $162,000 $10,171,671 $3,655,951 MANDATORY FUNDING JUSTIFICATION: The FY 2027 request for Air Force Aircraft Procurement includes $26,985,236 thousand of discretionary and $3,655,951 thousand of mandatory for a total of $30,641,187. F-35 Procurement: The $1,707 million procures 14 additional F-35A aircraft for the Air Force F-35 Sustainment: The $1,351 million procures initial spares, depot activation/material lay-in, and funds audit support. F-35 Procurement Full Funding: The $412.4 million fully funds aircraft quantities to the annual cost estimate 2025 cost position. F-35 Go-to-War Development Funding: The $162 million accelerates the Joint Program Office go-to-war development efforts. B-52 Bomber Resilient Operational Capabilities Suite: The $23.6 million provides funds to develop and field the Resilient Operational Capabilities Suite to provide hybrid satellite communications capability for the B-52 bomber. This fully funds the program's first year of EMD efforts to include design reviews, and test asset hardware buys. The FY 2026 spend plan amount for Air Force Aircraft Procurement includes $19,964,954 thousand of discretionary and $10,171,671 thousand of mandatory (reconciliation) for a total of $30,136,625. The FY 2025 spend plan amount for Air Force Aircraft Procurement includes $19,792,490 thousand of discretionary and no mandatory (reconciliation) for a total of $19,792,490. Volume 1 - xxviii === page 31 === UNCLASSIFIED ACRONYMS GENERAL ACRONYMS A&AS ABIDES ACAT ACTD AGM AIM AIS ACMI AMRAAM APPN ATD BA BES BY C3 CFE CONOPS CONUS CPMS CPT CRA CTS CY ECCM ECM ECO EOQ ECP EPA EW EWAISP FLIR - Advisory & Assistance Services - Automated Budget Interactive Data Environment System - Acquisition Category - Advanced Concept Technology Demonstration - Air-to-Ground Missile - Air Intercept Missile - Avionics Intermediate Shop - Aircraft Combat Maneuvering Instrumentation - Advanced Medium-Range Air-to-Air Missile - Appropriation - Advanced Technology Development - Budget Activity - Budget Estimate Submission - Budget Year - Command, Control, and Communication System - Contractor Furnished Equipment - Concept of Operation - Continental United States - Comprehensive Power Management System - Cockpit Procedures Trainer - Continuing Resolution Authority - Countermeasures Test Set - Current Year - Electronic Counter Counter-Measures - Electronic Counter Measures - Engineering Change Orders - Economic Order Quantity - Engineering Change Proposal - Economic Price Adjustment - Electronic Warfare - Electronic Warfare Avionics Integration Support Facility - Forward Looking Infra Red UNCLASSIFIED Volume 1 - xxix === page 32 === UNCLASSIFIED FOT&E FOC FLTS FPIF FPIS FY GANS GATM GFE GFP GPS GSE ICS IOC IT JUON MAIS MDAP METS MYP NAVWAR NMC Rate OCO OOC OT&E OWRM PAGEL PB PBR PMA PMC PNO PR PRCP PTT PY - Follow-on Test and Evaluation - Fully Operational Capability - Flight Line Test Set - Fixed Price Incentive Firm - Fixed Price Incentive Fee, Successive Targets - Fiscal Year - Global Access Navigation & Safety - Global Air Traffic Management - Government Furnished Equipment - Government Furnished Property - Global Positioning System - Ground Support Equipment - Interim Contractor Support - Initial Operating Capability - Information Technology - Joint Urgent Operational Need - Major Automated Information System Program - Major Defense Acquisition Program - Mobile Electronic Test Stations - Multiyear Procurement - Navigation Warfare - Not Mission Capable Rate - Overseas Contingency Operations - Overseas Operations Costs - Operational Test and Evaluation - Other War Reserve Material - Priced Aerospace Ground Equipment List - President's Budget - Program Budget Review - Program Management Administration - Procurement Method Code - Acquisition Program Number (MDAP Codes) - Purchase Request - Program Resource Collection Process - Part Task Trainer - Prior Year UNCLASSIFIED Volume 1 - xxx === page 33 === UNCLASSIFIED R&M RAA RDT&E RWR ROM SS SOF TAF TCAS TEWS TISS TOA WCF WRM WST UAV XML - Reliability and Maintainability - Rapid Acquisition Authority - Research, Development, Test and Evaluation - Radar Warning Receiver - Rough Order of Magnitude - Sole Source - Special Operation Force - Tactical Air Force - Traffic Collision Alert and Avoidance System - Tactical Electronic Warfare System - TEWS Intermediate Support System - Total Obligation Authority - Working Capital Fund - War Reserve Material - Weapon System Trainer - Unmanned Aerial Vehicle - Extensible Markup Language BASE / ORGANIZATIONAL ACRONYMS ACC - Air Combat Command AETC - Air Education & Training Command AFCAO - Air Force Computer Acquisition Office AFCESA - Air Force Civil Engineering Support Agency AFCIC - AF Communications & Information Center AFCSC - Air Force Cryptologic Service Center AFESC - Air Force Engineering Services Center AFGWC - Air Force Global Weather Central AFIT - Air Force Institute of Technology AFLCMC - Air Force Life Cycle Management Center AFMC - Air Force Materiel Command AFMETCAL - Air Force Metrology and Calibration Office AFMLO - Air Force Medical Logistics Office AFOSI - Air Force Office of Special Investigation AFOTEC - Air Force Operational Test & Evaluation Center AFPC - Air Force Personnel Center UNCLASSIFIED Volume 1 - xxxi === page 34 === UNCLASSIFIED AFPSL AFR AFSOC AFSPC AIA ALC AMC ANG ASC AETC AU AWS CIA DGSC DLA DOE DPSC DSCC DTIC ER ESC FAA FBI GSA JCS NATO OSW PACAF USAF USAFA USAFE USCENTCOM USEUCOM USMC USSTRATCOM WP AFB - AF Primary Standards Lab - Air Force Reserve - AF Special Operations Command - Air Force Space Command - Air Intelligence Agency - Air Logistics Center - Air Mobility Command - Air National Guard - Aeronautical Systems Center - Air Education Training Command - Air University - Air Weather Service - Central Intelligence Agency - Defense General Support Center - Defense Logistics Center - Department of Energy - Defense Personnel Support Center - Defense Supply Center, Columbus - Defense Technical Information Center - Eastern Range - Electronic Systems Center - Federal Aviation Agency - Federal Bureau of Investigation - General Services Administration - Joint Chiefs of Staff - North Atlantic Treaty Organization - Office of the Secretary of War - Pacific Air Forces - United States Air Force - United States Air Force Academy - United States Air Force Europe - United States Central Command - United States European Command - United States Marine Corps - United States Strategic Command - Wright-Patterson AFB, OH UNCLASSIFIED Volume 1 - xxxii === page 35 === UNCLASSIFIED CONTRACT METHOD / TYPE ACRONYMS C - Competitive BA - Basic Agreement BOA - Basic Ordering Agreement BPA - Blanket Purchasing Agreement CS - Cost Sharing IDDQ - Indefinite Delivery, Definite Quantity IDIQ - Indefinite Delivery, Indefinite Quantity IDRT - Indefinite Delivery, Requirements Letter - Letter LH - Labor-hour MIPR - Military Interdepartmental Purchase Request MIPR-C - Military Interdepartmental Purchase Request - Competitive MIPR-OPT - Military Interdepartmental Purchase Request - Option MIPR-OTH - Military Interdepartmental Purchase Request – Other MIPR-SS - Military Interdepartmental Purchase Request - Sole Source OPT - Option OTH - Other PO - Project Order REQN - Requisition SS - Sole Source T&M - Time and Materials UCA - Undefinitized Contract Action WP - Work Project CONTRACTED BY ACRONYMS 11 WING - 11th Support Wing, Washington, DC ACC - Air Combat Command, Langley AFB, VA AEDC - Arnold Engineering Development Center, Arnold AFB, TN AAC - Air Armament Center, Eglin AFB, FL AEDC - Arnold Engineering Development Center, Arnold AFB, TN AETC - Air Education and Training Command, Randolph AFB, TX AFCIC - Air Force Communications and Information Center, Washington, DC AFCESA - Air Force Civil Engineering Support Agency, Tyndall AFB, FL UNCLASSIFIED Volume 1 - xxxiii === page 36 === UNCLASSIFIED AFFTC AFLCMC AFMC AFMETCAL AFMLO AIA AMC ASC AFWA DGSC DPSC ER ESC HSC OC-ALC OO-ALC SMC US STRATCOM WACC WR WR-ALC AFSPC HQ ANG USAFE USAFA - Air Force Flight Test Center, Edwards AFB, CA - Air Force Life Cycle Management Center, Wright-Patterson AFB, OH - Air Force Materiel Command, Wright-Patterson AFB, OH - Air Force Metrology and Calibration Office, Heath, Ohio - Air Force Medical Logistics Office, Ft Detrick, MD - Air Intelligence Agency, Kelly AFB, TX - Air Mobility Command, Scott AFB, IL - Aeronautical Systems Center, Wright-Patterson AFB, OH & Eglin AFB, FL - Air Force Weather Agency, Offutt AFB, NE - Defense General Support Center, Richmond, VA - Defense Personnel Support Center, Philadelphia, PA - Eastern Range, Patrick SFB, FL - Electronic Systems Center, Hanscom AFB, MA - Human Services Center, Brook AFB, TX - Oklahoma City Air Logistics Center, Tinker AFB, OK - Ogden Air Logistics Center, Hill AFB, UT - Space & Missile Systems Center, Los Angeles AFB, CA - US Strategic Command, Offutt AFB, NE - Washington Area Contracting Center, Washington DC - Western Range, Vandenberg SFB, CA - Warner-Robins Air Logistics Center, Robins AFB, GA - Air Force Space Command, Peterson AFB, CO - Headquarters, Air National Guard, Washington, DC - United States Air Force Europe, Ramstein AB, GE - United States Air Force Academy, Colorado Springs, CO IDENTIFICATION CODES Code “A” - Line items of material which have been approved for Air Force service use. Code “B” - Line items of material that have not been approved for Service use OBAN - Operating Budget Account Number, 2-digit code for unit allocated funds UNCLASSIFIED Volume 1 - xxxiv === page 37 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 01: Combat Aircraft / BSA 1: Strategic Offensive ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: B02100 / B-21 Raider AP Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 437 Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 4,011.535 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 4,011.535 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 2,586.868 2,691.616 3,092.615 - To FY 2031 Complete - 3,092.615 5,539.123 7,222.806 9,464.697 10,352.156 Total - 708.000 721.600 862.000 - 862.000 1,005.667 1,149.333 1,149.333 1,149.346 1,878.868 1,970.016 2,230.615 - 2,230.615 4,533.456 6,073.473 8,315.364 9,202.810 1,149.333 - 44,961.416 7,894.612 37,066.804 708.000 721.600 862.000 1,005.667 - 1,005.667 1,149.333 1,149.333 1,149.346 1,149.333 - 7,894.612 4,719.535 2,600.468 2,832.016 3,236.282 - 3,236.282 5,682.789 7,222.806 9,464.710 10,352.143 - 44,961.416 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Funding may include, but not limited to aircraft flyaway costs, producibility improvements/incentives towards the active management strategy, modernization, support equipment, alternate mission equipment, training, spares, tooling, depot standup, engineering change orders, retrofits, and other government costs such as program support costs. In addition, funding may support Diminishing Manufacturing Sources and Material Shortages (DMSMS) and/or obsolescence issues. DMSMS activities may include, but are not limited to, bridge buys, life of type buys, buys to protect production schedule, and minor engineering efforts. The FY 2026 spend plan amount for Aircraft Procurement includes 2,832,016 thousand of discretionary and 4,500,000 thousand of mandatory (reconciliation) for a total of 7,332,016 thousand. The reconciliation funding supports the acceleration of B-21 combat capabilities and the increase of production capacity. This program is reported in accordance with Title 10, United States Code, Section 119(a)(1) in the Special Access Program Annual Report to Congress. For further information, please contact the Director of Special Programs, OUSD(A&S)/DSP. The FY 2027 budget request includes two years/two phases of Advance Procurement for long-lead materials/labor to support established Airframe build, Engine, and/or Modernization long-lead parts. Funding for this exhibit contained in PE 0101110F. LI B02100 - B-21 Raider AP Air Force UNCLASSIFIED Page 1 of 3 P-1 Line #1 Volume 1 - 1 === page 38 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 01: Combat Aircraft / BSA 1: Strategic Offensive ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: B02100 / B-21 Raider AP Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 437 Exhibits Schedule Exhibit Type Title* P-5 B-21 Raider AP P-40 Total Gross/Weapon System Cost Subexhibits ID CD A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 4,011.535 - / 2,586.868 - / 2,691.616 - / 3,092.615 - / - - / 3,092.615 - / 4,011.535 - / 2,586.868 - / 2,691.616 - / 3,092.615 - / - - / 3,092.615 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: This program is reported in accordance with Title 10, United States Code, Section 119(a)(1) in the Special Access Program Annual Report to Congress. For further information, please contact the Director of Special Programs, OUSD(A&S)/DSP. LI B02100 - B-21 Raider AP Air Force UNCLASSIFIED Page 2 of 3 P-1 Line #1 Volume 1 - 2 === page 39 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: B02100 / B-21 Raider AP Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 1 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: B-21 Raider AP MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) FY 2025 - Gross/Weapon System Cost ($ in Millions) 4,011.535 Less PY Advance Procurement ($ in Millions) 4,011.535 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2027 OOC - - - 2,586.868 - Net Procurement (P-1) ($ in Millions) FY 2026 - 2,691.616 3,092.615 - FY 2027 Total 3,092.615 708.000 721.600 862.000 - 862.000 1,878.868 1,970.016 2,230.615 - 2,230.615 708.000 721.600 862.000 1,005.667 - 1,005.667 4,719.535 2,600.468 2,832.016 3,236.282 - 3,236.282 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Flyaway - B-21 Raider Cost Recurring Cost B21 Raider - - 3,490.343 - - 1,878.868 - - 1,970.016 - - 2,230.615 - - - - - Long Lead - - 521.192 - - 708.000 - - 721.600 - - 862.000 - - - - - 862.000 - - 4,011.535 - - 2,586.868 - - 2,691.616 - - 3,092.615 - - - - - 3,092.615 Subtotal: Flyaway - B-21 Raider Cost - - 4,011.535 - - 2,586.868 - - 2,691.616 - - 3,092.615 - - - - - 3,092.615 Gross/Weapon System Cost - - 4,011.535 - - 2,586.868 - - 2,691.616 - - 3,092.615 - - - - - 3,092.615 Subtotal: Recurring Cost 2,230.615 Remarks: The FY 2027 budget request includes two years/two phases of Advance Procurement for long-lead materials/labor to support established Airframe build, Engine and/or Modernization long-lead parts. LI B02100 - B-21 Raider AP Air Force UNCLASSIFIED Page 3 of 3 P-1 Line #1 Volume 1 - 3 === page 40 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 4 === page 41 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 01: Combat Aircraft / BSA 1: Strategic Offensive P-1 Line Item Number / Title: B02100 / B-21 Raider AP Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 437 Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Gross/Weapon System Cost ($ in Millions) 708.000 721.600 862.000 1,005.667 - 1,005.667 1,149.333 1,149.333 1,149.346 1,149.333 - 7,894.612 Net Procurement (P-1) ($ in Millions) 708.000 721.600 862.000 1,005.667 - 1,005.667 1,149.333 1,149.333 1,149.346 1,149.333 - 7,894.612 Total Obligation Authority ($ in Millions) 708.000 721.600 862.000 1,005.667 - 1,005.667 1,149.333 1,149.333 1,149.346 1,149.333 - 7,894.612 Description: This program is reported in accordance with Title 10, United States Code, Section 119(a)(1) in the Special Access Program Annual Report to Congress. For further information, please contact the Director of Special Programs, OUSD(A&S)/DSP. The FY 2027 budget requests Advance Procurement (AP) for long-lead materials/labor to support Airframe build, Engine and/or Modernization long-lead parts. Due to Inter-company Work Order/Supplier span times and maturing manufacturing assumptions, longer Advance Procurement timelines led to a 2-year AP funding profile realignment necessary to protect delivery schedules. Funding for this exhibit contained in PE 0101110F. LI B02100 - B-21 Raider AP Air Force UNCLASSIFIED Page 1 of 4 P-1 Line #2 Volume 1 - 5 === page 42 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 01: Combat Aircraft / BSA 1: Strategic Offensive P-1 Line Item Number / Title: B02100 / B-21 Raider AP Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 437 Exhibits Schedule Exhibit Type Title* ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-10 B-21 Raider AP - / 708.000 - / 721.600 - / 862.000 - / 1,005.667 - / - - / 1,005.667 P-40 Total Gross/Weapon System Cost - / 708.000 - / 721.600 - / 862.000 - / 1,005.667 - / - - / 1,005.667 *Title represents the P-10 Title for Advance Procurement. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: This program is reported in accordance with Title 10, United States Code, Section 119(a)(1) in the Special Access Program Annual Report to Congress. For further information, please contact the Director of Special Programs, OUSD(A&S)/DSP. LI B02100 - B-21 Raider AP Air Force UNCLASSIFIED Page 2 of 4 P-1 Line #2 Volume 1 - 6 === page 43 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Air Force Date: April 2026 P-1 Line Item Number / Title: B02100 / B-21 Raider AP Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 1 First System (2027) Award Date: April 2026 First System (2027) Completion Date: April 2026 B-21 Raider AP Production Leadtime Interval Between Systems: 0 Months Prior Years (Months) P-5 Number / Title: B-21 Raider AP FY 2025 (Each) Quantity Cost Elements When Required Prior Years (Months) FY 2026 (Each) FY 2025 ($ M) FY 2027 (Each) (Each) FY 2026 ($ M) FY 2027 ($ M) ($ M) CFE (†) 708.000 721.600 862.000 1,005.667 Total: CFE 708.000 721.600 862.000 1,005.667 Total Advance Procurement/Obligation Authority 708.000 721.600 862.000 1,005.667 Long Lead: Various LI B02100 - B-21 Raider AP Air Force 0 UNCLASSIFIED Page 3 of 4 P-1 Line #2 Volume 1 - 7 === page 44 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Air Force Date: April 2026 Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 1 P-1 Line Item Number / Title: B02100 / B-21 Raider AP P-5 Number / Title: B-21 Raider AP FY 2027 Cost Elements Production Leadtime QPA (Months) (Each) Unit Cost ($ M) Contract Forecast Date 2027 Qty (Each) For FY Total Cost Request ($ M) CFE Long Lead: Various (†) - 1,005.667 Total: CFE 1,005.667 Total Advance Procurement/Obligation Authority 1,005.667 Description: The FY 2027 budget requests includes two years/two phases of Advance Procurement for long-lead materials/labor to support Airframe build, Engine and/or Modernization long-lead parts necessary to protect delivery schedules. Further details are reported in accordance with Title 10, United States Code, Section 119(a)(1) in the Special Access Program Annual Report to Congress. For further information, please contact the Director of Special Programs, OUSD(A&S)/DSP. (†) indicates the presence of Contract Data presented in the associated P-5 Item's P-5a exhibit. LI B02100 - B-21 Raider AP Air Force UNCLASSIFIED Page 4 of 4 P-1 Line #2 Volume 1 - 8 === page 45 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 01: Combat Aircraft / BSA 3: Tactical Forces ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: ATA000 / F-35 Program Elements for Code B Items: N/A Other Related Program Elements: 0604840F Line Item MDAP/MAIS Code: 198 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete 592 40 24 24 - 24 42 46 48 48 885 1,749 72,444.197 4,808.515 4,323.677 2,942.679 - 2,942.679 5,476.208 6,082.385 6,257.729 6,230.719 137,383.129 245,949.238 Total Less PY Advance Procurement ($ in Millions) 6,768.531 318.585 410.200 548.956 - 548.956 712.603 801.949 848.121 854.263 21,187.096 32,450.304 Net Procurement (P-1) ($ in Millions) 65,675.666 4,489.930 3,913.477 2,393.723 - 2,393.723 4,763.605 5,280.436 5,409.608 5,376.456 116,196.033 213,498.934 Plus CY Advance Procurement ($ in Millions) 7,124.116 482.584 531.241 738.103 - 738.103 805.798 848.675 867.248 1,009.352 20,043.187 32,450.304 Total Obligation Authority ($ in Millions) 72,799.782 4,972.514 4,444.718 3,131.826 - 3,131.826 5,569.403 6,129.111 6,276.856 6,385.808 136,239.220 245,949.238 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 4,426.558 438.246 531.759 269.528 - 269.528 901.664 1,290.492 989.825 760.057 Flyaway Unit Cost ($ in Millions) 107.808 99.172 127.153 72.403 - 72.403 111.421 113.379 115.590 111.262 143.228 - 9,608.129 125.854 Gross/Weapon System Unit Cost ($ in Millions) 122.372 120.213 180.153 122.612 - 122.612 130.386 132.226 130.369 129.807 155.235 140.623 Description: Joint Strike Fighter (JSF) program will enhance and field a family of aircraft that meets the needs of DoW and allies with three air vehicle variants including: the F-35A Conventional Take Off and Landing (CTOL) variant, the F-35B Short Take-Off and Vertical Landing (STOVL) variant, and the F-35C Carrier Variant (CV) delivering commonality among the three variants to minimize life cycle costs. This is a joint program with no executive service. Service Acquisition Executive (SAE) authority alternates between the Department of the Navy (DoN) and the Department of the Air Force (DAF) and currently resides with the Department of the Air Force. The F-35 is the next generation of strike fighters and provides increased aero-performance, stealth signature, and countermeasures. Its advanced avionics, data links, and adverse weather precision targeting incorporates the latest technology available. The F-35 has increased range with internal fuel tanks and can employ superior weaponry over existing aircraft. The highly supportable, affordable, state of the art aircraft commands and maintains global air superiority. The production cost and quantities are interdependent due to sole source air vehicle and propulsion contracts. United States Air Force (USAF) regular procurement commenced in FY2007, DoN regular procurement commenced in FY2008. Funding for this exhibit contained in PE 0207142F. Notes: USAF Initial Operational Capability (IOC) occurred on 2 August 2016 and the Full Rate Production (FRP) occurred on 12 March 2024. LI ATA000 - F-35 Air Force UNCLASSIFIED Page 1 of 12 P-1 Line #3 Volume 1 - 9 === page 46 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 01: Combat Aircraft / BSA 3: Tactical Forces ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: ATA000 / F-35 Program Elements for Code B Items: N/A Other Related Program Elements: 0604840F Line Item MDAP/MAIS Code: 198 Exhibits Schedule Exhibit Type Title* P-5 F-35 P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 592 / 72,444.197 40 / 4,808.515 24 / 4,323.677 24 / 2,942.679 - / - 24 / 2,942.679 592 / 72,444.197 40 / 4,808.515 24 / 4,323.677 24 / 2,942.679 - / - 24 / 2,942.679 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY2027 budget provides funding for F-35A Aircraft, Engines and associated non-recurring and ancillary mission equipment to support production and delivery. The budget request supports aircraft procurement and support requirements for squadron standup and associated training and logistical efforts. Non-Recurring flyaway costs for FY2027 include costs for tooling required to support full production capacity for hardware associated with delivering Block 4 capabilities. Non-Recurring costs also include funding to address Diminishing Manufacturing Sources (DMS) which includes costs to manage DMS issues, procurement of bridge or life-of-type buys, and if cost-benefit analysis supports non-recurring engineering to implement DMS redesigns within the performance envelope to the production line. Other non-recurring costs include but are not limited to chase support for government acceptance flights, Engineering Change Proposal Integration Contracts, systems engineering for production line efforts and production readiness reviews to address program risks and cost reduction initiatives. Support costs in FY2027 include costs that are fixed in nature and costs that fluctuate based on squadron/site stand up requirements. Support cost supports the procurement of airframe, engine, avionics peculiar ground support equipment (PGSE), and training equipment to support squadron and site stand-ups. The program will continue implementing the strategy to transition from the Autonomic Logistics Information System (ALIS) to the F-35 Operational Data Integrated Network (ODIN), a modern F-35 logistics information system. Hardware being procured is compatible with both ALIS and ODIN software. Depot activation efforts continue in FY2027, increasing repair capacity necessary for long-term sustainment of F-35 aircraft in support of the Global Sustainment Strategy (GSS) Reset. FY2027 request includes equipment and material to support establishment of depot repair capability, capacity and cyber compliance for components/sub-components across all U.S. Depots, support equipment for air vehicle modification dock expansion and Block 4 depot repair capability. FY2027 includes funding for propulsion depot standup to include module repair activities to meet expanding fleet repair requirements. The FY2027 request for Aircraft Procurement includes $3,131,826 thousand of discretionary and $2,338,058 thousand of mandatory for a total of $5,469,884 thousand. FY2027 total funding collectively supports the procurement of 38 (24 discretionary/14 mandatory)F-35As and supporting non-recurring flyaway and support efforts. LI ATA000 - F-35 Air Force UNCLASSIFIED Page 2 of 12 P-1 Line #3 Volume 1 - 10 === page 47 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: ATA000 / F-35 Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: F-35 MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total 592 40 24 24 - 24 72,444.197 4,808.515 4,323.677 2,942.679 - 2,942.679 Less PY Advance Procurement ($ in Millions) 6,768.531 318.585 410.200 548.956 - 548.956 Net Procurement (P-1) ($ in Millions) 65,675.666 4,489.930 3,913.477 2,393.723 - 2,393.723 Plus CY Advance Procurement ($ in Millions) 7,124.116 482.584 531.241 738.103 - 738.103 Total Obligation Authority ($ in Millions) 72,799.782 4,972.514 4,444.718 3,131.826 - 3,131.826 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 4,426.558 438.246 531.759 269.528 - 269.528 122.372 120.213 180.153 122.612 - 122.612 Gross/Weapon System Unit Cost ($ in Millions) Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Flyaway - Flyaway End Item Cost Recurring Cost (†) (1) 63.487 594 37,711.395 63.543 40 2,541.715 74.190 24 1,780.550 24.000 38 912.017 - - - 24.000 38 912.017 (2) 17.192 594 10,211.809 13.948 40 557.937 14.472 24 347.334 5.658 38 215.022 - - - 5.658 38 215.022 - - - - - - - - 0.000 8.813 38 334.897 - - - 8.813 38 334.897 - - - 0.824 40 32.976 0.115 24 2.770 0.047 38 1.799 - - - 0.047 38 1.799 14.022 594 8,328.774 15.800 40 632.000 18.898 24 453.543 6.416 38 243.826 - - - 6.416 38 243.826 2.150 594 1,277.046 0.100 40 4.000 - - 57,529.024 - - - - 3,762.273 - - - 2,530.803 - Subtotal: Non Recurring Cost - - 6,293.076 Subtotal: Flyaway - Flyaway End Item Cost - - (9) - (10) - Airframe/CFE CFE Electronics Other GFE - Radar (†) (3) Other GFE (4) (†) Engines/Eng ACC (5) ECO (6) Subtotal: Recurring Cost 1.819 24 43.652 0.792 38 30.113 - - - 0.792 38 30.113 3,768.628 - - 2,627.849 - - 1,737.674 - - - - - 1,737.674 - 57.922 - - 209.107 - - 0.000 - - - - - 0.000 - 140.323 - - 214.727 - - 0.000 - - - - - 0.000 - - 198.245 - - 423.834 - - 0.000 - - - - - 0.000 63,822.100 - - 3,966.873 - - 3,051.683 - - 1,737.674 - - - - - 1,737.674 - 1,125.103 - - 55.402 - - 151.679 - - 166.233 - - - - - 166.233 - 134.872 - - 3.743 - - 5.331 - - 5.568 - - - - - 5.568 Non Recurring Cost Non-Recurring Cost Ancillary Equip (7) (8) Support - Support End Item Cost Airframe PGSE Engine PGSE LI ATA000 - F-35 Air Force UNCLASSIFIED Page 3 of 12 P-1 Line #3 Volume 1 - 11 === page 48 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: ATA000 / F-35 Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: F-35 MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Unit Cost Cost Elements Avionics PGSE ($ M) (11) Peculiar Training Equipment (12) Full Mission Simulators (13) ODIN / PUBS / TECH DATA/ MPE (14) Other ILS Production (15) Production Eng Support (16) Fixed JPO Support Depot Standup (17) (18) Depot Standup Software (19) Depot Standup Air Vehicle (20) Depot Standup Propulsion JRE (21) (22) Subtotal: Support - Support End Item Cost Gross/Weapon System Cost (†) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) - - 647.242 - - 0.992 - - 17.190 - - 17.852 - - - - - 17.852 - - 619.182 - - 84.616 - - 237.580 - - 254.026 - - - - - 254.026 - - 755.041 - - 37.398 - - 37.240 - - 88.435 - - - - - 88.435 - - 225.982 - - 10.455 - - 36.169 - - 36.502 - - - - - 36.502 - - 1,469.740 - - 78.510 - - 121.121 - - 153.905 - - - - - 153.905 - - 1,266.835 - - 51.246 - - 83.032 - - 121.600 - - - - - 121.600 - - 342.776 - - 78.450 - - 87.246 - - 95.626 - - - - - 95.626 - - 915.149 - - 0.000 - - 0.000 - - - - - - - - - - - 125.364 - - 14.433 - - 79.182 - - 77.048 - - - - - 77.048 - - 584.512 - - 355.404 - - 386.479 - - 139.316 - - - - - 139.316 - - 410.299 - - 70.993 - - 29.144 - - 48.277 - - - - - 48.277 - - 0.000 - - - - - 0.601 - - 0.617 - - - - - 0.617 - - 8,622.097 - - 841.642 - - 1,271.994 - - 1,205.005 - - - - - 1,205.005 592 72,444.197 40 4,808.515 24 4,323.677 24 2,942.679 - - - 24 2,942.679 122.372 120.213 180.153 122.612 122.612 indicates the presence of a P-5a Footnotes: (1) Airframe Unit Recurring Flyaway (URF) price is directly affected by a number of cost pressures including the USAF, DoN, Partner, and Foreign Military Sales (FMS) quantity profiles. Unit Recurring Flyaway (URF) costs account for configuration updates, capability increments as well as inflation related cost pressures. FY2027 includes $912,017 thousand discretionary funding including PY AP, combined with the mandatory funding of $907,720 thousand for a total procurement of 38 F-35As. (2) CFE Electronics URF price is directly affected by a number of cost pressures including the USAF, DoN, Partners, and FMS quantity profiles. URF costs account for configuration updates, supplier escalation, as well as inflation related cost pressures. FY2027 includes $215,022 thousand discretionary funding including PY AP, combined with the mandatory funding of $214,009 thousand for a total procurement of 38 F-35As. (3) APG-85 cost continues the procurement of APG-85 radar's which replaces the existing APG-81 radar in United States versions of F-35 aircraft. APG-85 just in time advance procurement for long lead materials is required two years in advance due to APG-85 manufacturing timelines and F-35 aircraft lot insertion schedules. See Adv Procurement P-40 and P-10 for additional details. FY2027 accounts for Prior LI ATA000 - F-35 Air Force UNCLASSIFIED Page 4 of 12 P-1 Line #3 Volume 1 - 12 === page 49 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 P-1 Line Item Number / Title: ATA000 / F-35 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: F-35 MDAP/MAIS Code: year Advance Procurement and Budget year funding. FY2027 includes $334,897 thousand discretionary funding including PY AP, and does not include any mandatory funding for a total procurement of 38 F-35A Radars. (4) Other Government Furnished Equipment (GFE) captures non-prime contract URF costs, such as Cost Reduction Initiatives, GFE Workload, and Countermeasure efforts. FY2027 includes $1,799 thousand discretionary funding including PY AP, combined with the mandatory funding of $1,790 thousand for a total procurement of 38 F-35As. (5) Engine Unit Recurring Flyaway (URF) price is directly affected by a number of cost pressures including USAF, DoN, Partner, and FMS quantity profiles and inflationary pressures. URF costs account for configuration updates, supplier escalation, as well as inflation related cost pressures. FY2027 includes $243,826 thousand discretionary funding including PY AP, combined with the mandatory funding of $242,678 thousand for a total procurement of 38 F-35As. (6) ECO URF price is directly affected by a number of cost pressures including the USAF, DoN, Partners, and FMS quantity profiles. ECO costs account for configuration updates and capability increments as well as inflation related cost pressures. FY2027 includes $30,113 thousand discretionary funding including PY AP, combined with the mandatory funding of $29,972 thousand for a total procurement of 38 F-35As. (7) Non-recurring Costs include items such as USAF share of Production Non-Recurring Tooling necessary to capacitize the supply chain to build new Block 4 capabilities and maintain planned production schedules. Funding includes requirements for Diminishing Manufacturing Sources (DMS) "Life-of-type" part buys, management, and non-recurring redesign engineering, acceptance chase support, Engineering Change Proposal Integration Contracts, and technical assistance. This cost element includes variable (aircraft quantity driven) and fixed costs. Non-Recurring Engineering execution timelines are directly influenced by the aircraft and engine production Lot negotiation pricing and award timelines. FY2027 costs are primarily driven by DMS Aircraft redesign increases for TR-3 Integrated Core Processor and Panoramic Cockpit Display Electronic Unit requirements. Additionally, funding accounts for production line tooling increases, canopy tooling to enable the manufacturer to up keep with the production line. Funding also accounts for Engineering Change Proposal Integration to help accelerate 8,000-flight-hour redesigns, as well as an expected increase in the need for design changes and improvements driven by discoveries from the growing fleet and the increased population of older aircraft, to include corrosion findings. FY2027 does not include any discretionary funding, but does include mandatory funding of $434,275 thousand. (8) Ancillary Equip: Equipment required to deliver fully mission capable aircraft. Costs are affected primarily by pilot throughput and turnover, and to a lesser degree, aircraft quantities. Costs vary by FY based on mission capabilities and aircraft configurations. Equipment and hardware includes Launcher Kits, Bomb Racks, Missile Launchers, Adapter Kits, Pylon Kits, Rail Launcher, Gun Pods, Magazine, Umbilical Cable, Pilot Flight Equipment (PFE), Helmet Mounted Display (HMD), Portable Memory Device (PMD), and Countermeasures. FY2027 requirements account for new requirements, such as Organic Light Emitting Diode (OLED) helmet mounted displays, low observable armament pylons and bomb rack. Additional cost driver is due to a significant increase in customer helmet requirements, aligning to pilot growth and overall throughput. FY2027 does not include any discretionary funding, but does include mandatory funding of $288,944 thousand. (9) Airframe Peculiar Ground Support Equipment (PGSE): This element provides the projected costs for the procurement and delivery of airframe F-35 Support Equipment (SE) for On- and Off-Equipment maintenance tasks at the Organizational level. On-equipment maintenance supports on-aircraft sortie generation tasks, to include inspections, servicing, handling, weapons/stores loading, launch and recovery, aircraft turn around, component removal and replacement, and repairs by operations unit personnel. Off-equipment maintenance includes those tasks that cannot be effectively accomplished on the aircraft or end item. Organizational off-equipment maintenance may require the removal of the component to a maintenance facility. Off-equipment maintenance includes specific support equipment repair and servicing tasks. FY2027 includes: Aircraft Arrival (Moody AFB OPS 12-1, Tyndall AFB OPS 8-3) - All of the initial SE components must be available when that first aircraft arrives in order to properly maintain and sustain the fleet. Additionally, funds fielded squadrons operational backfills for deferred SE not available during squadron stand up. (10) Engine PGSE: This element provides the projected costs for the procurement and delivery of propulsion F-35 Support Equipment (SE) for On- and Off-Equipment maintenance tasks at the Organizational level. On-equipment maintenance supports on-aircraft sortie generation tasks, to include inspections, servicing, handling, weapons/stores loading, launch and recovery, aircraft turn around, component removal and replacement, and repairs by operations unit personnel. Off-equipment maintenance includes those tasks that cannot be effectively accomplished on the aircraft or end item. Organizational off-equipment maintenance may require the removal of the component to a maintenance facility. Off-equipment maintenance includes specific support equipment repair and servicing tasks. FY2027 includes: Aircraft Arrival (Moody AFB OPS 12-1, Tyndall AFB OPS 8-3) - All of the initial SE components must be available when that first aircraft arrives in order to properly maintain and sustain the fleet. Additionally, funds fielded squadrons operational backfills for deferred SE not available during squadron stand up. (11) Avionics PGSE: This element provides the projected costs for the procurement and delivery of avionics F-35 Support Equipment (SE) for On- and Off-Equipment maintenance tasks at the Organizational level. On-equipment maintenance supports on-aircraft sortie generation tasks, to include inspections, servicing, handling, weapons/stores loading, launch and recovery, aircraft turn around, component removal and replacement, and repairs by operations unit personnel. Off-equipment maintenance includes those tasks that cannot be effectively accomplished on the aircraft or end item. Organizational off-equipment maintenance may require the removal of the component to a maintenance facility. Off-equipment maintenance includes specific support equipment repair and servicing tasks. FY2027 includes: Aircraft Arrival (Moody AFB OPS 12-1, Tyndall AFB OPS 8-3) - All of the initial SE components must be available when that first aircraft arrives in order to properly maintain and sustain the fleet. Additionally, funds fielded squadrons operational backfills for deferred SE not available during squadron stand up. LI ATA000 - F-35 Air Force UNCLASSIFIED Page 5 of 12 P-1 Line #3 Volume 1 - 13 === page 50 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 P-1 Line Item Number / Title: ATA000 / F-35 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: F-35 MDAP/MAIS Code: (12) Peculiar Training Equipment: Costs directly support the procurement of additional peculiar training equipment at training and operational sites (Moody AFB, Misawa AFB). Supports training device Block 4 integration. Supports requirements for USAF bed down plan in order to meet the pilot throughput and the JSE Operations Enclave (JOE) hardware and software procurement, shipping, installation, calibration, operations, and maintenance. (13) Full Mission Sims (FMS): Costs support Initial Pilot Training Devices for Kingsley Field Modified Mission Rehearsal Trainers (MMRTs), PACAF OPS-11 Full Mission Simulator (FM Sim); and Supplemental Pilot Training Devices for Luke AFB. Requirements for USAF bed down plan in order to meet the pilot throughput. (14) ODIN/PUB/TECH DATA/MPE: Cost support ODIN/ALIS equipment, mission planning environment (MPE) equipment, site activation support. The program will continue to procure and field MPE Next-Gen Mission Planning (NGMP) hardware/software, to fully replace obsolete Ground Data Receptacles (GDRs) and server racks (SOU-C) with MPE Squadron Kits (MSKs), Inline field encryption devices (IFEDs) and cross-domain solutions (CDSs), and will continue to procure equipment for the Joint Reprogramming Enterprise U.S. Reprogramming Lab (USRL) to maintain air-system alignment and provide the latest rapid reprogramming capabilities. Year to year changes in ODIN are a result of investments required to support site and squadron stand-ups. FY2027 supports ALIS/ODIN Squadron and Deployment Kits (Tyndall AFB OPS 8-3, Hill AFB Ogden ALC 309 AMXG, Misawa AFB OPS 11-2); Shared Tech Data for Provisioning. (15) Integrated Logistics Support (ILS): Shared Maintenance Planning (LM Aero, BAE, NGC Heads), Government Property Management, Unique Site Activation Planning, Professional Flight Equipment (PFE) Chemical/Biological Procurement, PFE Ancillary Pool, and WIN7 to WIN10 migration. FY2027 supports Technical Data provisioning and cataloging, Crew systems Site Activation Planning, and Post Ejection Survival Planning. (16) Production Engineering Support bridges the gap between the initial design and the ongoing manufacturing process. It addresses challenges and opportunities that arise during the production phase, aiming to optimize the manufacturing process, resolve technical issues, and maintain product quality. It is cost-shared with F-35 partners, ensuring equitable contributions across the F-35 enterprise. FY2027 costs support increases in manpower training to improve processes that drive for more cost-effective manufacturing and assembly in efforts to address the F-35 GSS Reset. (17) Fixed JPO Support: Starting in FY2022, Fixed JPO Support was broken out into a separate cost element from Production Engineering Support. Fixed JPO support costs are cost shared across the US and Partner participants and cost shares are balanced at the aggregate across all Services and appropriations. This cost element includes funds for the JPO program operations and administrative requirements at the enterprise level. Efforts in this cost element include working capital technical SME labor/civilian pay, program office Contractor Support Services, Arlington, VA and Dayton, OH program unique off-base lease costs, travel, supplies, program office IT and software/hardware applications, cybersecurity, studies (to include audit and affordability studies), and program office oversight of property management. These costs are not programmed, budgeted, or funded as part of base operating support and are not associated with Headquarters level support. The F-35 JPO continues to review program office civilian pay and contractor support and FY2027 reflects the latest program projections for program support labor. (18) (19) Starting in FY2022, Depot Standup is broken down in detail in Depot Standup Software, Depot Standup Air Vehicle, and Depot Standup Propulsion Organic Software Center (Depot) Standup: This initiative activates organic software centers at Hill AFB and Warner Robins AFB to enable independent software development and integration across the F-35 fleet for core software and infrastructure domains. Funding supports a range of government and industry activities, including hardware procurement and sustainment, licensing, and OEM support and training. The core infrastructure domain is System Integration Lab (SIL) at Hill AFB. Core software domains are distributed across all the sites: Hill AFB manages Pilot Software Systems, Core Processing Software, System Design, and Build & Release, and shares Prognostic and Health Management with NAWCWD China Lake. Warner Robins AFB oversees the APG-81 Radar, External Data Links (XCOM), Electro-Optical Training Systems, and the Distributed Aperture System. (20) Depot Standup Air Vehicle: Costs support shared planning and activation for component-level capability and airframe depots, including Line Replaceable Unit, Tech refresh; Dock Expansions; and Depot Support Equipment. Activation, and Ogden Scruff and Refresh facilities in efforts to address the F-35 GSS Reset. FY2027 includes $139,316 thousand discretionary funding combined with the mandatory funding for $218,671 thousand. (21) (22) Depot Standup Propulsion: Shared planning, activation, and capacity for Oklahoma City Air Logistics Center and Fleet Readiness Center East and Southeast. Joint Reprogramming Environment (JRE): Hardware Procurement for United States Research Laboratory. LI ATA000 - F-35 Air Force UNCLASSIFIED Page 6 of 12 P-1 Line #3 Volume 1 - 14 === page 51 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 Item Number / Title [DODIC]: F-35 FY Contractor and Location Method/Type or Funding Vehicle (†) 2023 Lockheed Martin / Fort Worth, TX SS / FPIF NAVAIR Apr 2023 Jul 2025 43 56.379 Y Jan 2020 (†) 2024 Lockheed Martin / Fort Worth, TX SS / FPIF NAVAIR Dec 2024 Mar 2026 51 56.439 Y Mar 2023 (†) 2025 Lockheed Martin / Fort Worth, TX SS / FPIF NAVAIR Jun 2025 Mar 2027 40 63.543 Y Mar 2023 (†) 2026 Lockheed Martin / Fort Worth, TX SS / TBD NAVAIR Dec 2026 Nov 2027 24 74.190 Y Jan 2025 (†) Airframe/CFE 2027 Lockheed Martin / Fort Worth, TX SS / TBD NAVAIR Dec 2026 Apr 2028 38 24.000 Y Jan 2025 Other GFE - Radar 2027 Northrop Grumman / Baltimore, MD SS / FFP NAVAIR Nov 2026 Apr 2028 38 8.813 Y Mar 2026 (†) 2023 Pratt & Whitney / East Hartford, CT SS / FPIF NAVAIR Jun 2023 Mar 2025 43 12.654 Y Mar 2020 (†) 2024 Pratt & Whitney / East Hartford, CT SS / FPIF NAVAIR Aug 2025 Dec 2025 51 14.169 Y May 2023 (†) 2025 Pratt & Whitney / East Hartford, CT SS / FPIF NAVAIR Apr 2026 Nov 2026 40 15.800 Y May 2023 (†) 2026 Pratt & Whitney / East Hartford, CT SS / TBD NAVAIR Apr 2027 Aug 2027 24 18.898 Y Mar 2025 (†) 2027 Pratt & Whitney / East Hartford, CT SS / TBD NAVAIR Jun 2027 Feb 2028 38 6.416 Y Mar 2025 Airframe/CFE: Long Lead Material 2027 Lockheed Martin / Fort Worth, TX SS / TBD NAVAIR Dec 2026 Apr 2028 42 7.419 Y Jan 2025 Other GFE - Radar: APG-85 Radar - two year lead time AP 2027 Northrop Grumman / Baltimore, MD SS / FFP NAVAIR Nov 2026 Apr 2028 46 1.743 Y Mar 2026 Other GFE - Radar: APG-85 Radar - one year lead time AP 2027 Northrop Grumman / Baltimore, MD SS / FFP NAVAIR Nov 2026 Apr 2028 42 7.138 Y Mar 2026 Engines/Eng ACC: Mount Signal Conditioning Unit 2027 Pratt & Whitney / East Hartford, CT SS / TBD NAVAIR Jun 2027 Feb 2028 42 0.003 Y Mar 2025 Engines/Eng ACC: IDMS Ring, Forward 2027 Pratt & Whitney / East Hartford, CT SS / TBD NAVAIR Jun 2027 Feb 2028 42 0.005 Y Mar 2025 Engines/Eng ACC: IDMS Ring, Rear 2027 Pratt & Whitney / East Hartford, CT SS / TBD NAVAIR Jun 2027 Feb 2028 42 0.005 Y Mar 2025 Engines/Eng ACC: Advance Acquisition Contracts 2027 Pratt & Whitney / East Hartford, CT SS / TBD NAVAIR Jun 2027 Feb 2028 42 1.095 Y Mar 2025 Cost Elements Airframe/CFE Airframe/CFE Airframe/CFE Airframe/CFE Engines/Eng ACC Engines/Eng ACC Engines/Eng ACC Engines/Eng ACC Engines/Eng ACC O O C P-1 Line Item Number / Title: ATA000 / F-35 Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date Advance Procurement (†) indicates the presence of a P-21 Remarks: F-35A production capacity is influenced by total F-35 production quantities. Maximum combined production including partners for F-35A is 110 per year. F-35 is actively re-evaluating the contract type for Airframe contracts and at this time, it is currently undetermined which contract vehicle will be utilized moving forward. LI ATA000 - F-35 Air Force UNCLASSIFIED Page 7 of 12 P-1 Line #3 Volume 1 - 15 === page 52 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: ATA000 / F-35 Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 Cost Elements (Units in Each) O O C M F R # FY Airframe/CFE SERVICE PROC QTY Item Number / Title [DODIC]: F-35 Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 500 1 2023 AF 43 0 43 1 2024 AF 51 0 51 51 1 2025 AF 40 0 40 40 1 2026 AF 24 0 24 24 1 2027 AF 38 0 38 38 Engines/Eng ACC A - - - - - - - - - - - - - - - - - - 43 (5) Prior Years Deliveries: 500 2 2023 AF 43 0 43 2 2024 AF 51 0 51 A - 51 2 2025 AF 40 0 40 40 2 2026 AF 24 0 24 24 2 2027 AF 38 0 38 - - - - - - - - - - - - - - 43 38 O C T LI ATA000 - F-35 Air Force - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #3 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 16 === page 53 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: ATA000 / F-35 Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 Cost Elements (Units in Each) O O C M F R # FY Airframe/CFE SERVICE PROC QTY Item Number / Title [DODIC]: F-35 Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N Calendar Year 2026 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 500 1 2023 AF 43 0 43 1 2024 AF 51 0 51 1 2025 AF 40 0 40 1 2026 AF 24 0 24 24 1 2027 AF 38 0 38 38 Engines/Eng ACC - - - - - - - - - A - - - - - - - - 4 - 3 - 10 - 7 - 4 - 5 - 3 - 5 A - - - - - - - - - 2 0 4 4 - 4 - 4 - 4 - 4 - 4 - - 23 40 (5) Prior Years Deliveries: 500 2 2023 AF 43 0 43 2 2024 AF 51 0 51 2 2025 AF 40 0 40 2 2026 AF 24 0 24 2 2027 AF 38 0 38 - - - - 4 3 5 11 3 7 4 A - 5 - 1 - 0 - 2 3 8 5 2 4 A - 7 - 3 - 6 - 5 - - 6 40 24 38 O C T LI ATA000 - F-35 Air Force - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #3 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 17 === page 54 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: ATA000 / F-35 Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 Cost Elements (Units in Each) O O C M F R # FY Airframe/CFE SERVICE PROC QTY Item Number / Title [DODIC]: F-35 Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P (1) Prior Years Deliveries: 500 1 2023 AF 43 43 0 1 2024 AF 51 28 23 1 2025 AF 40 0 40 1 2026 AF 24 0 1 2027 AF 38 Engines/Eng ACC 0 4 4 - 4 - 4 4 3 0 - - - 3 4 3 3 3 3 3 3 24 A - - - - - - - - - - - 0 38 A - - - - - - - - - - - 3 3 3 3 3 3 2 7 7 5 - - - - 0 0 - 3 3 6 2 1 5 18 (5) Prior Years Deliveries: 500 2 2023 AF 43 43 0 2 2024 AF 51 45 6 2 2025 AF 40 0 40 2 2026 AF 24 0 24 2 2027 AF 38 0 38 0 6 4 4 4 4 4 4 4 A O C T LI ATA000 - F-35 Air Force 0 - N O V D E C J A N F E B M A R A P R 4 M A Y 4 - - A - - J U N J U L 4 0 1 3 A U G UNCLASSIFIED Page 10 of 12 3 S E P 3 O C T 3 N O V 3 D E C J A N F E B P-1 Line #3 2 2 2 2 3 3 3 3 M A R A P R M A Y 0 4 J U N 4 J U L 3 A U G 3 12 S E P Volume 1 - 18 === page 55 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: ATA000 / F-35 Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 Cost Elements (Units in Each) O O C M F R # FY Airframe/CFE SERVICE PROC QTY Item Number / Title [DODIC]: F-35 Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E (1) Prior Years Deliveries: 500 1 2023 AF 43 43 0 0 1 2024 AF 51 51 0 0 1 2025 AF 40 40 0 0 1 2026 AF 24 24 0 1 2027 AF 38 20 18 Engines/Eng ACC 0 3 3 3 3 3 3 0 (5) Prior Years Deliveries: 500 2 2023 AF 43 43 0 0 2 2024 AF 51 51 0 0 2 2025 AF 40 40 0 0 2 2026 AF 24 24 0 2 2027 AF 38 26 12 0 3 O C T LI ATA000 - F-35 Air Force 3 N O V 3 D E C 3 J A N 0 F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #3 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 19 === page 56 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: ATA000 / F-35 Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 Item Number / Title [DODIC]: F-35 Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Lockheed Martin - Fort Worth, TX 24 48 60 0 0 0 0 21 3 16 19 2 Pratt & Whitney - East Hartford, CT 24 48 60 0 0 0 0 19 9 8 17 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI ATA000 - F-35 Air Force UNCLASSIFIED Page 12 of 12 P-1 Line #3 Volume 1 - 20 === page 57 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 01: Combat Aircraft / BSA 3: Tactical Forces P-1 Line Item Number / Title: ATA000 / F-35 Program Elements for Code B Items: N/A Other Related Program Elements: 0604840F Line Item MDAP/MAIS Code: 198 Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Gross/Weapon System Cost ($ in Millions) 7,124.116 482.584 531.241 738.103 - 738.103 805.798 848.675 867.248 1,009.352 20,043.187 32,450.304 Net Procurement (P-1) ($ in Millions) 7,124.116 482.584 531.241 738.103 - 738.103 805.798 848.675 867.248 1,009.352 20,043.187 32,450.304 Total Obligation Authority ($ in Millions) 7,124.116 482.584 531.241 738.103 - 738.103 805.798 848.675 867.248 1,009.352 20,043.187 32,450.304 Description: Joint Strike Fighter (JSF) program is developing and fielding a family of aircraft that meets the needs of DoW and allies, with the F-35A Conventional Take Off and Landing (CTOL) variant, F-35B Short Take-Off and Vertical Landing (STOVL) variant and F-35C Carrier Variant (CV). The aircraft will have commonality among the three variants to minimize life cycle costs. This is a joint program with no executive service. Service Acquisition Executive (SAE) authority alternates between Department of Navy (DoN) and Department of Air Force (DAF) and currently resides with the Department of the Air Force. The F-35 is next generation of strike fighters to command and maintain global air superiority. FY 2027 Advance procurement funding will support Aircraft and Engine Termination Liability and long-lead parts and materials necessary to protect delivery schedule. FY 2027 AP procures Other GFE APG-85 Radar for U.S. Aircraft. Funding for this exhibit is contained in PE 0207142F. LI ATA000 - F-35 Air Force UNCLASSIFIED Page 1 of 4 P-1 Line #4 Volume 1 - 21 === page 58 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 01: Combat Aircraft / BSA 3: Tactical Forces P-1 Line Item Number / Title: ATA000 / F-35 Program Elements for Code B Items: N/A Other Related Program Elements: 0604840F Line Item MDAP/MAIS Code: 198 Exhibits Schedule Exhibit Type Title* ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-10 F-35 592 / 7,124.116 40 / 482.584 24 / 531.241 24 / 738.103 - / - 24 / 738.103 P-40 Total Gross/Weapon System Cost 592 / 7,124.116 40 / 482.584 24 / 531.241 24 / 738.103 - / - 24 / 738.103 *Title represents the P-10 Title for Advance Procurement. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 budget requests Advance Procurement for long lead materials to support Airframe and Engine long-lead parts necessary to protect delivery schedules. Full funding for long lead end items requesting advance procurement is included in the budget submission. FY 2027 budget exhibits include funding to support the procurement of Other GFE - APG-85 radar to replace the APG-81 radar in United States versions of F-35 aircraft. Due to extra-long lead times, the APG-85 requires advance procurement for long-lead materials and radar completion for on-time install into the aircraft. The first year of APG-85 adv procurement procures radar long-lead materials and the second year of AP continues material buys, to manufacture and deliver the APG-85 for integration onto US-only aircraft. Funding for this exhibit is contained in PE 0207142F. LI ATA000 - F-35 Air Force UNCLASSIFIED Page 2 of 4 P-1 Line #4 Volume 1 - 22 === page 59 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Air Force Date: April 2026 P-1 Line Item Number / Title: ATA000 / F-35 Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 First System (2027) Award Date: January 2026 First System (2027) Completion Date: January 2028 Production Leadtime F-35 Quantity Interval Between Systems: 0 Months Prior Years (Months) FY 2025 (Each) When Required 592 Prior Years (Months) FY 2026 (Each) 24 Cost Elements P-5 Number / Title: F-35 40 FY 2025 ($ M) FY 2027 (Each) (Each) 24 FY 2026 ($ M) 24 FY 2027 ($ M) ($ M) CFE Airframe/CFE: Long Lead Material (†) 18 Total: CFE 5,789.151 340.466 247.225 311.586 5,789.151 340.466 247.225 311.586 0.000 72.384 66.527 80.169 0.000 - 164.216 299.790 GFE Other GFE - Radar: APG-85 Radar - two year lead time AP (†) 36 Other GFE - Radar: APG-85 Radar - one year lead time AP (†) 18 Engines/Eng ACC: Long Lead Material Engines/Eng ACC: Mount Signal Conditioning Unit Engines/Eng ACC: IDMS Ring, Forward Engines/Eng ACC: IDMS Ring, Rear (†) (†) (†) Engines/Eng ACC: Advance Acquisition Contracts (†) 24 1,168.605 0.000 0.000 0.000 24 0.353 0.151 0.141 0.143 24 0.544 0.210 0.214 0.218 24 0.528 0.210 0.214 0.218 24 164.935 69.163 52.704 45.979 Total: GFE 1,334.965 142.118 284.016 426.517 Total Advance Procurement/Obligation Authority 7,124.116 482.584 531.241 738.103 LI ATA000 - F-35 Air Force UNCLASSIFIED Page 3 of 4 P-1 Line #4 Volume 1 - 23 === page 60 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Air Force Date: April 2026 Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 P-1 Line Item Number / Title: ATA000 / F-35 P-5 Number / Title: F-35 FY 2027 Production Leadtime QPA Cost Elements Unit Cost (Months) (Each) ($ M) Contract Forecast Date 2027 Qty For FY (Each) Total Cost Request ($ M) CFE Airframe/CFE: Long Lead Material (†) - 18 7.419 Dec 2026 42 Total: CFE 311.586 311.586 GFE Other GFE - Radar: APG-85 Radar - two year lead time AP (†) - 36 1.743 Nov 2026 46 80.169 Other GFE - Radar: APG-85 Radar - one year lead time AP (†) - 18 7.138 Nov 2026 42 299.790 Engines/Eng ACC: Long Lead Material - Engines/Eng ACC: Mount Signal Conditioning Unit Engines/Eng ACC: IDMS Ring, Forward Engines/Eng ACC: IDMS Ring, Rear (†) (†) (†) Engines/Eng ACC: Advance Acquisition Contracts (†) 0.000 - 24 0.003 Jun 2027 42 0.143 - 24 0.005 Jun 2027 42 0.218 - 24 0.005 Jun 2027 42 0.218 - 24 1.095 Jun 2027 42 45.979 Total: GFE 426.517 Total Advance Procurement/Obligation Authority 738.103 Description: F-35 Advance Procurement. CFE-Airframe: AP funding will be used towards the following Air Vehicle suppliers/systems based on the lead time associated with the material such as: TR-3 Components (Integrated Core Processor, Aircraft Memory System, Panoramic Cockpit Display); Bulkhead forgings; Collins Landing Gear; BAE Electronic Warfare components; IAI Outer Wing Box; BAE Aft Fuselage components; Northrop Grumman Center Fuselage, Communication, Navigation & Identification (CNI), Block 4 components, EW Drop 13, and Radar components; ATK Wing Skins; Curtiss-Wright Controls Leading Edge Flap Drive System (LEFDS); Ball Aerospace CNI Integrated Body Apertures; Heroux-Devtek Flight Opening Door Uplock System (FODUS); Fokker Flaperons; Arkwin Industries Actuators; and Leonardo Wing. GFE-Engines Long Lead: Advance Acquisition Contracts (AAC) will be awarded for long-lead items on a termination liability basis to protect delivery schedule. AP funding will be used towards the following Propulsion suppliers/systems based on lead time associated with material(s): Engine Hardware (High Pressure Turbine (HPT), Low Pressure Turbine (LPT), Turbine Exhaust, Compressor Rotors and Stators, Nozzle, Liners and Seals) and Collins Inlet Debris Monitor Signal Conditioning Units (IDMS SCUs). GFE-APG85 Radar: The budget request includes two years/two phases of advance procurement to procure the APG-85 radar which replaces the existing APG-81 radar in United States versions of F-35 aircraft. The two-year AP supports suppliers/systems based on lead time associated with the materials: microcircuits, connectors, magnet assembly, transceiver kits, inductor chips, forward housing assembly, signal processors, radiator structures, amplifiers, and chassis assembly. The FY27 one year lead time AP cost has been adjusted based on the prior two year lead time AP cost to capture the total APG-85 AP requirement. (†) indicates the presence of Contract Data presented in the associated P-5 Item's P-5a exhibit. LI ATA000 - F-35 Air Force UNCLASSIFIED Page 4 of 4 P-1 Line #4 Volume 1 - 24 === page 61 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 01: Combat Aircraft / BSA 3: Tactical Forces ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: CCA000 / Collaborative Combat Aircraft AP Program Elements for Code B Items: 0207147F Other Related Program Elements: 0207179F Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - Procurement Quantity (Units in Each) - - - Gross/Weapon System Cost ($ in Millions) - 0.000 0.000 Less PY Advance Procurement ($ in Millions) - 0.000 Net Procurement (P-1) ($ in Millions) - 0.000 Plus CY Advance Procurement ($ in Millions) - 0.000 Total Obligation Authority ($ in Millions) - 0.000 996.528 - 996.528 2,196.932 1,981.046 0.000 0.000 - 0.000 150.500 0.000 0.000 996.528 - 996.528 2,046.432 1,981.046 0.000 150.500 - 150.500 0.000 0.000 0.000 1,147.028 - 1,147.028 2,046.432 1,981.046 2,077.911 To FY 2031 Complete - Total - - 2,259.734 - 9,512.151 0.000 0.000 - 150.500 2,077.911 2,259.734 - 9,361.651 0.000 0.000 - 150.500 2,077.911 2,259.734 - 9,512.151 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Collaborative Combat Aircraft (CCA) are uncrewed weapon systems capable of enhancing crewed weapon systems ability to achieve air superiority. Key CCA capabilities include mission-integrated autonomy, multi-platform interoperability, and collaborative lethality enhancement with those interoperable platforms. CCA will contribute to multiple mission requirements and provide Combatant Commanders (CCDR) with options for enhancing manned-platform capability in Highly Contested Environments (HCE). The FY27 budget request initiates the procurement of Collaborative Combat Aircraft (CCA), an uncrewed system. This funding will support the procurement of the initial air vehicles, ground control systems, and the integration of mission systems and autonomy packages. Specifically, funds will be allocated to air vehicle production, government-furnished equipment (GFE), and program management to ensure the establishment of a robust production line and to support initial operational testing and evaluation activities. CCA will procure air vehicle prime mission equipment (PME) and alternate mission equipment (AME) based on operational requirements, threat evolution, and/or technological opportunities. PME and AME opportunities may include, but are not limited to, communication, electronic warfare, radio frequency, and infrared mission systems. This requirement supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. In accordance with Section 1815 of the FY2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. Funding for this exhibit contained in PE 0207147F. LI CCA000 - Collaborative Combat Aircraft AP Air Force UNCLASSIFIED Page 1 of 4 P-1 Line #5 Volume 1 - 25 === page 62 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 01: Combat Aircraft / BSA 3: Tactical Forces ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: CCA000 / Collaborative Combat Aircraft AP Program Elements for Code B Items: 0207147F Other Related Program Elements: 0207179F Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Collaborative Combat Aircraft AP P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a B MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 0.000 - / 0.000 - / 996.528 - / - - / 996.528 - / - - / 0.000 - / 0.000 - / 996.528 - / - - / 996.528 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: This program is a new start. LI CCA000 - Collaborative Combat Aircraft AP Air Force UNCLASSIFIED Page 2 of 4 P-1 Line #5 Volume 1 - 26 === page 63 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: CCA000 / Collaborative Combat Aircraft AP Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: Collaborative Combat Aircraft AP MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 Procurement Quantity (Units in Each) - - - Gross/Weapon System Cost ($ in Millions) - 0.000 0.000 Less PY Advance Procurement ($ in Millions) - 0.000 Net Procurement (P-1) ($ in Millions) - 0.000 Plus CY Advance Procurement ($ in Millions) - 0.000 Total Obligation Authority ($ in Millions) - 0.000 FY 2027 Base FY 2027 OOC - - FY 2027 Total - 996.528 - 996.528 0.000 0.000 - 0.000 0.000 996.528 - 996.528 0.000 150.500 - 150.500 0.000 1,147.028 - 1,147.028 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Vehicles - Collaborative Combat Aircraft Cost Recurring Cost Aircraft - - - - - 0.000 - - 0.000 - - 996.528 - - - - - 996.528 - - - - - 0.000 - - 0.000 - - 996.528 - - - - - 996.528 Subtotal: Vehicles Collaborative Combat Aircraft Cost - - - - - 0.000 - - 0.000 - - 996.528 - - - - - 996.528 Gross/Weapon System Cost - - - - - 0.000 - - 0.000 - - 996.528 - - - - - 996.528 Subtotal: Recurring Cost Remarks: Details of contract data are not shown due to level of security classification. Procurement funds (to include Advance Procurement funding) may include, but are not limited to, purchase of air vehicles, engines, autonomy, spares, support equipment, interim contractor support, training systems, ground segments, and other support, equipment, or government costs as required for CCA. LI CCA000 - Collaborative Combat Aircraft AP Air Force UNCLASSIFIED Page 3 of 4 P-1 Line #5 Volume 1 - 27 === page 64 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 Cost Elements O O C P-1 Line Item Number / Title: CCA000 / Collaborative Combat Aircraft AP FY Contractor and Location Method/Type or Funding Vehicle 2027 TBD / TBD TBD Item Number / Title [DODIC]: Collaborative Combat Aircraft AP Location of PCO Award Date Date of First Delivery TBD Feb 2027 Mar 2027 Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date Advance Procurement Aircraft LI CCA000 - Collaborative Combat Aircraft AP Air Force UNCLASSIFIED Page 4 of 4 P-1 Line #5 1 150.500 Volume 1 - 28 === page 65 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 01: Combat Aircraft / BSA 3: Tactical Forces P-1 Line Item Number / Title: CCA000 / Collaborative Combat Aircraft AP Program Elements for Code B Items: 0207147F Other Related Program Elements: 0207179F Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Gross/Weapon System Cost ($ in Millions) - 0.000 0.000 150.500 - 150.500 0.000 0.000 0.000 0.000 - 150.500 Net Procurement (P-1) ($ in Millions) - 0.000 0.000 150.500 - 150.500 0.000 0.000 0.000 0.000 - 150.500 Total Obligation Authority ($ in Millions) - 0.000 0.000 150.500 - 150.500 0.000 0.000 0.000 0.000 - 150.500 Description: Collaborative Combat Aircraft (CCA) are uncrewed weapon systems capable of enhancing crewed weapon systems ability to achieve air superiority. Key CCA capabilities include mission-integrated autonomy, multi-platform interoperability, and collaborative lethality enhancement with those interoperable platforms. The FY27 request for CCA includes 150,500 thousands of Advanced Procurement. The FY27 budget request initiates the procurement of Collaborative Combat Aircraft (CCA), an uncrewed system. This funding will support the procurement of the initial air vehicles, ground control systems, and the integration of mission systems and autonomy packages. Specifically, funds will be allocated to air vehicle production, government-furnished equipment (GFE), and program management to ensure the establishment of a robust production line and to support initial operational testing and evaluation activities. Funding includes aircraft flyaway costs, producibility improvement/incentives towards the active management strategy, support equipment, alternate mission equipment, training, spares, depot standup, engineering change orders and other government costs, such as program support costs. Funding may also be used to resolve Diminishing Manufacturing Sources and Material Shortages (DMSMS) and/or obsolescence issues. DMSMS activities may include, but are not limited to, bridge buys, life of type buys, buys to protect production schedule, and minor engineering efforts. This program is reported in accordance with Title 10, United States Code, Section 119(a)(1) in the Special Access Program Annual Report to Congress. For further information, please contact the Director of Special Programs, OUSD(A&AS)/DSP. Funding for this exhibit is contained in PE 0207147F. LI CCA000 - Collaborative Combat Aircraft AP Air Force UNCLASSIFIED Page 1 of 4 P-1 Line #6 Volume 1 - 29 === page 66 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 01: Combat Aircraft / BSA 3: Tactical Forces P-1 Line Item Number / Title: CCA000 / Collaborative Combat Aircraft AP Program Elements for Code B Items: 0207147F Other Related Program Elements: 0207179F Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-10 Collaborative Combat Aircraft AP - / - - / 0.000 - / 0.000 - / 150.500 - / - - / 150.500 P-40 Total Gross/Weapon System Cost - / - - / 0.000 - / 0.000 - / 150.500 - / - - / 150.500 *Title represents the P-10 Title for Advance Procurement. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Full funding for every end item requesting advanced procurement is included in the budget submission. LI CCA000 - Collaborative Combat Aircraft AP Air Force UNCLASSIFIED Page 2 of 4 P-1 Line #6 Volume 1 - 30 === page 67 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Air Force Date: April 2026 P-1 Line Item Number / Title: CCA000 / Collaborative Combat Aircraft AP Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 First System (2027) Award Date: January 2027 First System (2027) Completion Date: July 2028 Collaborative Combat Aircraft AP Production Leadtime Quantity Interval Between Systems: 1 Months Prior Years (Months) FY 2025 (Each) 0 Cost Elements When Required FY 2026 (Each) Prior Years (Months) P-5 Number / Title: Collaborative Combat Aircraft AP FY 2025 ($ M) FY 2027 (Each) (Each) FY 2026 ($ M) FY 2027 ($ M) ($ M) CFE Aircraft (†) - 0 - - 150.500 Total: CFE - - - 150.500 Total Advance Procurement/Obligation Authority - 0.000 0.000 150.500 LI CCA000 - Collaborative Combat Aircraft AP Air Force UNCLASSIFIED Page 3 of 4 P-1 Line #6 Volume 1 - 31 === page 68 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Air Force Date: April 2026 Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 P-1 Line Item Number / Title: CCA000 / Collaborative Combat Aircraft AP P-5 Number / Title: Collaborative Combat Aircraft AP FY 2027 Cost Elements Production Leadtime QPA Unit Cost (Months) (Each) ($ M) Contract Forecast Date 2027 Qty For FY (Each) Total Cost Request ($ M) CFE Aircraft (†) - 0 150.500 Feb 2027 150.500 1 Total: CFE 150.500 Total Advance Procurement/Obligation Authority 150.500 Description: Specific contract details are not provide to comply with Security Classification Guide. The FY 2027 budget requests includes Advance Procurement for long-lead materials/labor to support Airframe build, Engine and/or Modernization long-lead parts necessary to protect delivery schedules. Further details are reported in accordance with Title 10, United States Code, Section 119(a)(1) in the Special Access Program Annual Report to Congress. For further information, please contact the Director of Special Programs, OUSD(A&S)/DSP. (†) indicates the presence of Contract Data presented in the associated P-5 Item's P-5a exhibit. LI CCA000 - Collaborative Combat Aircraft AP Air Force UNCLASSIFIED Page 4 of 4 P-1 Line #6 Volume 1 - 32 === page 69 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 01: Combat Aircraft / BSA 3: Tactical Forces ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: F015EX / F-15EX Program Elements for Code B Items: 0207146F Other Related Program Elements: 0207134F Line Item MDAP/MAIS Code: 725 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete 72 18 1 24 - 24 24 28 36 36 7,854.679 2,036.472 115.000 2,656.716 - 2,656.716 2,758.000 3,262.510 4,535.950 4,762.750 0.000 Total - 239 27,982.077 545.419 228.000 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 0.000 773.419 7,309.260 1,808.472 115.000 2,656.716 - 2,656.716 2,758.000 3,262.510 4,535.950 4,762.750 0.000 27,208.658 773.419 0.000 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 0.000 773.419 8,082.679 1,808.472 115.000 2,656.716 - 2,656.716 2,758.000 3,262.510 4,535.950 4,762.750 0.000 27,982.077 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 336.582 43.104 30.400 - 30.400 - 410.086 Flyaway Unit Cost ($ in Millions) 96.661 103.029 115.000 - 101.495 - 101.495 105.438 - 108.151 - 119.156 - 125.251 - - 107.625 Gross/Weapon System Unit Cost ($ in Millions) 109.093 113.137 115.000 110.697 - 110.697 114.917 116.518 125.999 132.299 - 117.080 Description: The F-15EX is a new multirole-capable fighter jet based on the 2-seat F-15QA (Qatar) configuration upgraded with advanced capabilities, including the Eagle Passive Active Warning Survivability System (EPAWSS) and the USAF F-15 Continuous Delivery & Integration (CD&I) Operational Flight Program (OFP) software. The F-15EX platform provides significant operational flexibility, enabling it to perform a wide range of mission sets with one or two aircrew. The F-15EX aircraft will be used predominantly in defensive and offensive counter-air missions at both Air National Guard (ANG) and Air Combat Command (ACC) operational squadrons. F-15EX will perform the Homeland Defense mission and provide Combatant Commanders (CCDR) with strike packages capable of operating in Highly Contested Environments (HCE). In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. Funding may be used to resolve Diminishing Manufacturing Sources and Material Shortages (DMSMS) and/or obsolescence issues. DMSMS activities may include, but are not limited to, bridge buys, life of type buys, buys to protect production schedule, and minor engineering efforts. Funding for this exhibit is contained in PE 0207146F. This exhibit does not include the eight (8) aircraft in Lot 1 which were funded outside this exhibit in FY 2020 (two test aircraft were purchased with RDT&E funds (PE 0207134F); four operationally representative test aircraft and two operational aircraft were purchased with procurement funds (F015E0, Line #3)). The Totals column does not include the eight (8) Lot 1 aircraft included in PEs 0207134F and 0207146F, nor the twenty one (21) Lot 7 aircraft included in the One Big Beautiful Bill reconciliation funding which would increase the total aircraft Procurement Quantity in this budget exhibit to 268. The FY 2026 spend plan amount for Aircraft Procurement includes 115,000 thousand of discretionary (qty 1) and 2,806,792 thousand of mandatory (qty 21) (reconciliation) for a total of 2,921,792 thousand (qty 22). LI F015EX - F-15EX Air Force UNCLASSIFIED Page 1 of 12 P-1 Line #7 Volume 1 - 33 === page 70 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 01: Combat Aircraft / BSA 3: Tactical Forces ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: F015EX / F-15EX Program Elements for Code B Items: 0207146F Other Related Program Elements: 0207134F Line Item MDAP/MAIS Code: 725 Exhibits Schedule Exhibit Type Title* P-5 F-15EX P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 B MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 72 / 7,854.679 18 / 2,036.472 1 / 115.000 24 / 2,656.716 - / - 24 / 2,656.716 72 / 7,854.679 18 / 2,036.472 1 / 115.000 24 / 2,656.716 - / - 24 / 2,656.716 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: BASIS FOR FY 2027 BUDGET REQUEST: The FY 2027 budget provides funding for twenty-four F-15EX Lot 8 aircraft and associated support equipment, training systems, depot activation, initial spares, production non-recurring engineering and related items required to manufacture the aircraft, operational conversion support, logistics and sustainment activities, and program support to manage and execute F-15EX efforts. Lot 6 was awarded on 22 Jan 2025. The negotiated values of Lots 4, 5 and 6 contracts are reflected in the cost element budget values of Prior Years and FY 2025. LI F015EX - F-15EX Air Force UNCLASSIFIED Page 2 of 12 P-1 Line #7 Volume 1 - 34 === page 71 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: F015EX / F-15EX Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: F-15EX MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2027 Base FY 2027 OOC FY 2027 Total 1 24 - 24 7,854.679 2,036.472 115.000 2,656.716 - 2,656.716 545.419 228.000 0.000 0.000 - 0.000 7,309.260 1,808.472 115.000 2,656.716 - 2,656.716 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2026 18 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2025 72 773.419 0.000 0.000 0.000 - 0.000 8,082.679 1,808.472 115.000 2,656.716 - 2,656.716 30.400 - 30.400 110.697 - 110.697 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 336.582 43.104 Gross/Weapon System Unit Cost ($ in Millions) 109.093 113.137 115.000 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Flyaway - F-15EX Cost Recurring Cost (†) 79.239 72 5,705.189 83.985 18 1,511.733 88.842 1 88.842 84.295 24 2,023.086 - - - 84.295 24 2,023.086 9.427 72 678.745 9.581 18 172.454 9.636 1 9.636 9.693 24 232.643 - - - 9.693 24 232.643 AME - - 185.487 - - 65.907 - - 8.606 - - 29.757 - - - - - 29.757 GFE - - 333.118 - - 92.154 - - 7.424 - - 138.657 - - - - - 138.657 Pilot Gear - - 22.655 - - 5.540 - - 0.346 - - 8.212 - - - - - 8.212 SEPM - - 34.401 - - 6.736 - - 0.146 - - 3.513 - - - - - 3.513 Subtotal: Recurring Cost - - 6,959.595 - - 1,854.524 - - 115.000 - - 2,435.868 - - - - - 2,435.868 Subtotal: Flyaway - F-15EX Cost - - 6,959.595 - - 1,854.524 - - 115.000 - - 2,435.868 - - - - - 2,435.868 Other Support Costs - - 242.920 - - 81.251 - - - - - 69.581 - - - - - 69.581 Training - - 151.597 - - 33.821 - - - - - 31.910 - - - - - 31.910 Support Equipment - - 145.654 - - 23.772 - - - - - 30.400 - - - - - 30.400 Initial Spares - - 336.582 - - 43.104 - - - - - 88.957 - - - - - 88.957 Depot Activation - - 18.331 - - 0.000 - - - - - - - - - - - - Retrofits - - - - - 0.000 - - - - - - - - - - - - - - 895.084 - - 181.948 - - - - - 220.848 - - - - - 220.848 72 7,854.679 18 2,036.472 24 2,656.716 - - - 24 2,656.716 Airframe Engines (2) (†) Support - F-15EX Cost Subtotal: Support - F-15EX Cost Gross/Weapon System Cost LI F015EX - F-15EX Air Force 109.093 113.137 115.000 1 115.000 UNCLASSIFIED Page 3 of 12 110.697 P-1 Line #7 110.697 Volume 1 - 35 === page 72 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 P-1 Line Item Number / Title: F015EX / F-15EX ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: F-15EX MDAP/MAIS Code: Remarks: The Air Force awarded Lot 6 was on 22 Jan 2025. The negotiated values of Lots 4, 5 and 6 contracts are reflected in the cost element budget values of Prior Years and FY 2025. The Lot 5 and 6 negotiated contract values form the basis for inflation adjustments to FY2027 requirements. Recurring costs: -- Airframe costs include Eagle Passive Active Warning Survivability System (EPAWSS) procurement and Production Non-Recurring Engineering (NRE) for 24 F-15EX Lot 8 aircraft. -- Engine procurement quantities represent one set (two) General Electric F110-GE-129 engines per aircraft. -- Alternate Mission Equipment (AME) includes the procurement of pylons, miscellaneous aircraft equipment and Conformal Fuel Tanks (CFTs) for 24 F-15EX Lot 8 aircraft. -- Government Furnished Equipment (GFE) includes costs for Raytheon APG-82 radars, and multiple radios and components provided by the government to the Boeing production line. -- SEPM costs are based upon the F-15EX Services contract which awarded in March 2024 with four option years. Support costs: -- Other Support Costs include program office support, Interim Contractor Support (ICS) & Field Support Representatives (FSR), Logistics Management and Diminishing Manufacturing Source (DMS) efforts for Airframe, Engines and GFE. -- Training costs include the procurement of training devices for one operational squadron that had not previously received new F-15EX training devices. -- Support Equipment and Spares costs include the F-15EX unique hardware required to support 24 F-15EX Lot 8 aircraft to existing F-15EX operational bases for aircraft, engine and other subsystem components. Cost Variation Explanations: --There is a gap in the Cost Elements due to qty 21 airframe/engines funded with FY26 reconciliation (mandatory) bill funding which is not included in this document. -- Variation in procurement quantity requirements and advanced procurement funding levels across FYs creates variation in Gross Weapon System Unit Costs across FYs. -- Support Cost variations primarily result from strategic basing decisions, requirements at selected locations, and the lead times associated with procuring equipment. The cost magnitude of support requirements procured with each lot contract are influenced more by basing requirements than by aircraft quantities. (†) indicates the presence of a P-5a (†) indicates the presence of a P-5a LI F015EX - F-15EX Air Force UNCLASSIFIED Page 4 of 12 P-1 Line #7 Volume 1 - 36 === page 73 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 FY Contractor and Location (†) 2021 Boeing / St. Louis, MO SS / FPIF AFLCMC/WA Nov 2021 (†) 2022 Boeing / St. Louis, MO SS / FFP AFLCMC/WA Dec 2022 Jul 2026 12 79.361 Y Sep 2022 (†) 2023 Boeing / St. Louis, MO SS / FPIF AFLCMC/WA Sep 2023 Apr 2027 24 76.828 Y Dec 2022 (†) 2024 Boeing / St. Louis, MO SS / FPIF AFLCMC/WA Jul 2024 Apr 2028 24 82.433 Y Jun 2023 (†) 2025 Boeing / St. Louis, MO SS / FPIF AFLCMC/WA Jan 2025 Apr 2029 18 83.985 Y Jun 2023 (†) 2026 Boeing / St. Louis, MO SS / FPIF AFLCMC/WA Sep 2026 Dec 2030 1 88.842 Y Feb 2026 Airframe Airframe Airframe Airframe Airframe Airframe (†) Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Mar 2025 12 76.941 Y Oct 2020 Qty (Each) RFP Issue Date 2027 Boeing / St. Louis, MO SS / FPIF AFLCMC/WA Jan 2027 Jan 2031 24 84.295 Y Jan 2026 Engines (2) (†) 2021 General Electric / Cincinnati, OH C / FFP AFLCMC/WA Oct 2021 Dec 2024 12 9.378 Y Feb 2021 Engines (2) (†) 2022 General Electric / Cincinnati, OH C / FFP AFLCMC/WA Sep 2022 Jan 2026 12 9.385 Y Feb 2021 Engines (2) (†) 2023 General Electric / Cincinnati, OH C / FFP AFLCMC/WA Jun 2023 Oct 2026 24 9.409 Y Feb 2021 Engines (2) (†) 2024 General Electric / Cincinnati, OH C / FFP AFLCMC/WA Jul 2024 Oct 2027 24 9.490 Y Feb 2021 Engines (2) (†) 2025 General Electric / Cincinnati, OH C / FFP AFLCMC/WA Jan 2025 Oct 2028 18 9.581 Y Feb 2021 Engines (2) (†) 2026 General Electric / Cincinnati, OH C / FFP AFLCMC/WA Jan 2026 Jun 2030 1 9.636 Y Feb 2021 Engines (2) (†) 2027 General Electric / Cincinnati, OH C / FFP AFLCMC/WA Jan 2027 Jul 2030 24 9.693 Y Feb 2021 Airframe (†) Item Number / Title [DODIC]: F-15EX Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: F015EX / F-15EX indicates the presence of a P-21 Remarks: There is a gap in the airframe/engine deliveries due to qty 21 airframe/engines funded with FY26 reconciliation bill funding which is not included in this document. The FY25 contract which funded Lot 6 aircraft has been awarded. The F-15EX engine contract was competitively sourced to General Electric in Oct 2021. The contract includes option years for up to nine lots. Engines through Lot 7 have been awarded. LI F015EX - F-15EX Air Force UNCLASSIFIED Page 5 of 12 P-1 Line #7 Volume 1 - 37 === page 74 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: F015EX / F-15EX Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 Cost Elements (Units in Each) O O C M F R # PROC QTY Item Number / Title [DODIC]: F-15EX Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P FY SERVICE 1 2021 AF 12 0 12 1 2022 AF 12 0 12 1 2023 AF 24 0 24 1 2024 AF 24 0 24 24 1 2025 AF 18 0 18 18 1 2026 AF 1 0 1 1 1 2027 AF 24 0 24 24 Airframe A - - - - - - - - - - - - - - - - - - - - - - - 12 A - - - - - - - - - - 12 A - 24 Engines (2) 2 2021 AF 12 0 12 2 2022 AF 12 0 12 A - 2 2023 AF 24 0 24 2 2024 AF 24 0 24 24 2 2025 AF 18 0 18 18 2 2026 AF 1 0 1 1 2 2027 AF 24 0 24 24 O C T LI F015EX - F-15EX Air Force - N O V - D E C - J A N - F E B - M A R - A P R - M A Y - J U N - J U L - A U G UNCLASSIFIED Page 6 of 12 - - - - - - - - - - - - - 12 A - - - - - - - - - - - - - 12 A - - - - 24 S E P O C T N O V D E C J A N F E B P-1 Line #7 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 38 === page 75 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: F015EX / F-15EX Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 Cost Elements (Units in Each) O O C M F R # PROC QTY Item Number / Title [DODIC]: F-15EX Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P FY SERVICE 1 2021 AF 12 0 12 - - - - - - - - - - - - - - - - - - 6 1 2022 AF 12 0 12 - - - - - - - - - - - - - - - - - - - - - - - - 12 1 2023 AF 24 0 24 - - - - - - - - - - - - - - - - - - - - - - - - 24 1 2024 AF 24 0 24 A - - - - - - - - - - - - - - - 24 1 2025 AF 18 0 18 A - - - - - - - - - 18 1 2026 AF 1 0 1 1 1 2027 AF 24 0 24 24 Airframe 1 1 1 1 1 1 Engines (2) 2 2021 AF 12 0 12 - - - - - - - - - - - - - - 2 2022 AF 12 0 12 - - - - - - - - - - - - - - - - - - - - - - - - 12 2 2023 AF 24 0 24 - - - - - - - - - - - - - - - - - - - - - - - - 24 2 2024 AF 24 0 24 A - - - - - - - - - - - - - - - 24 2 2025 AF 18 0 18 A - - - - - - - - - 18 2 2026 AF 1 0 1 1 2 2027 AF 24 0 24 24 O C T LI F015EX - F-15EX Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 12 S E P O C T N O V 1 D E C 1 J A N 1 F E B P-1 Line #7 1 M A R 1 A P R 1 M A Y 2 J U N 1 J U L 1 A U G 2 0 S E P Volume 1 - 39 === page 76 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: F015EX / F-15EX Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 Cost Elements (Units in Each) O O C M F R # PROC QTY Item Number / Title [DODIC]: F-15EX Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P FY SERVICE 1 2021 AF 12 6 6 - - - 1 2022 AF 12 0 12 - - - - - - - - - 1 2023 AF 24 0 24 - - - - - - - - - - - - - - - - - - 1 2024 AF 24 0 24 - - - - - - - - - - - - - - - - - - - - - - - - 24 1 2025 AF 18 0 18 - - - - - - - - - - - - - - - - - - - - - - - - 18 1 2026 AF 1 0 1 A - - - - - - - - - - - - - 1 1 2027 AF 24 0 24 A - - - - - - - - - 24 Airframe 1 1 1 1 1 1 0 1 1 2 1 2 1 2 1 1 0 2 2 2 2 2 2 12 Engines (2) 2 2021 AF 12 12 0 2 2022 AF 12 0 12 - - - 0 2 2023 AF 24 0 24 - - - - - - - - - - - - 2 2024 AF 24 0 24 - - - - - - - - - - - - - - - - - - - - - - - - 24 2 2025 AF 18 0 18 - - - - - - - - - - - - - - - - - - - - - - - - 18 2 2026 AF 1 0 1 A - - - - - - - - - - - - - - - - - - - - - 1 2 2027 AF 24 0 24 A - - - - - - - - - 24 O C T LI F015EX - F-15EX Air Force N O V D E C 1 J A N 1 F E B 2 M A R 1 A P R 2 M A Y 1 J U N 2 J U L 1 A U G UNCLASSIFIED Page 8 of 12 1 S E P 0 2 O C T 2 N O V 2 D E C 2 J A N 2 F E B P-1 Line #7 2 M A R 2 A P R 2 M A Y 2 J U N 2 J U L 2 A U G 2 0 S E P Volume 1 - 40 === page 77 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: F015EX / F-15EX Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 Cost Elements (Units in Each) O O C M F R # PROC QTY Item Number / Title [DODIC]: F-15EX Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P FY SERVICE 1 2021 AF 12 12 0 1 2022 AF 12 12 0 1 2023 AF 24 12 12 1 2024 AF 24 0 24 - - - - - - 1 2025 AF 18 0 18 - - - - - - - - - - - - - - - - - - 1 2026 AF 1 0 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 1 2027 AF 24 0 24 - - - - - - - - - - - - - - - - - - - - - - - - 24 Airframe 0 0 2 2 2 2 2 2 0 2 2 2 2 2 2 2 2 2 2 2 2 0 2 2 2 2 2 2 6 Engines (2) 2 2021 AF 12 12 0 0 2 2022 AF 12 12 0 0 2 2023 AF 24 24 0 2 2024 AF 24 0 24 2 2025 AF 18 0 18 - - - - - - - - - - - - 2 2026 AF 1 0 1 - - - - - - - - - - - - - - - - - - - - - - - - 1 2 2027 AF 24 0 24 - - - - - - - - - - - - - - - - - - - - - - - - 24 0 2 O C T LI F015EX - F-15EX Air Force 2 N O V 2 D E C 2 J A N 2 F E B 2 M A R 2 A P R 2 M A Y 2 J U N 2 J U L 2 A U G UNCLASSIFIED Page 9 of 12 2 S E P 0 2 O C T 2 N O V 2 D E C 2 J A N 2 F E B P-1 Line #7 2 M A R 2 A P R 2 M A Y 2 J U N 0 J U L A U G S E P Volume 1 - 41 === page 78 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: F015EX / F-15EX Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 Cost Elements (Units in Each) O O C M F R # PROC QTY Item Number / Title [DODIC]: F-15EX Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2031 M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P FY SERVICE 1 2021 AF 12 12 0 0 1 2022 AF 12 12 0 0 1 2023 AF 24 24 0 0 1 2024 AF 24 24 0 1 2025 AF 18 12 6 1 2026 AF 1 0 1 - - - - - - - - - - - - - - 1 2027 AF 24 0 24 - - - - - - - - - - - - - - Airframe 0 2 2 2 0 1 0 - 2 2 2 2 2 2 2 2 2 6 Engines (2) 2 2021 AF 12 12 0 0 2 2022 AF 12 12 0 0 2 2023 AF 24 24 0 0 2 2024 AF 24 24 0 0 2 2025 AF 18 18 0 2 2026 AF 1 0 1 - - - - - - - - 2 2027 AF 24 0 24 - - - - - - - - 0 O C T LI F015EX - F-15EX Air Force N O V D E C J A N F E B M A R A P R M A Y 1 0 J U N 2 J U L 2 A U G UNCLASSIFIED Page 10 of 12 2 S E P 2 O C T 2 N O V 2 D E C 2 J A N 2 F E B P-1 Line #7 2 M A R 2 A P R 2 M A Y 2 J U N 0 J U L A U G S E P Volume 1 - 42 === page 79 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: F015EX / F-15EX Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 Cost Elements (Units in Each) O O C M F R # PROC QTY Item Number / Title [DODIC]: F-15EX Fiscal Year 2032 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2031 1 OCT Fiscal Year 2033 Calendar Year 2032 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2033 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E FY SERVICE 1 2021 AF 12 12 0 0 1 2022 AF 12 12 0 0 1 2023 AF 24 24 0 0 1 2024 AF 24 24 0 0 1 2025 AF 18 18 0 0 1 2026 AF 1 1 0 1 2027 AF 24 18 6 Airframe 0 2 2 2 0 Engines (2) 2 2021 AF 12 12 0 0 2 2022 AF 12 12 0 0 2 2023 AF 24 24 0 0 2 2024 AF 24 24 0 0 2 2025 AF 18 18 0 0 2 2026 AF 1 1 0 0 2 2027 AF 24 24 0 0 O C T LI F015EX - F-15EX Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 12 S E P O C T N O V D E C J A N F E B P-1 Line #7 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 43 === page 80 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: F015EX / F-15EX Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 Item Number / Title [DODIC]: F-15EX Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial ALT Prior to Oct 1 ALT After Oct 1 Reorder Manufacturing PLT Total After Oct 1 ALT Prior to Oct 1 ALT After Oct 1 Manufacturing PLT Total After Oct 1 Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Boeing - St. Louis, MO 12 18 24 3 4 48 52 0 0 0 0 2 General Electric - Cincinnati, OH 12 18 24 3 4 42 46 0 0 0 0 Remarks: There is a gap in the airframe/engine deliveries due to qty 21 airframe/engines funded with FY26 reconciliation bill funding which is not included in this document. Engine procurement quantities represent one set (two engines) per aircraft. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI F015EX - F-15EX Air Force UNCLASSIFIED Page 12 of 12 P-1 Line #7 Volume 1 - 44 === page 81 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 01: Combat Aircraft / BSA 3: Tactical Forces ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: JSE000 / Joint Simulation Environment Program Elements for Code B Items: 0207606F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - Procurement Quantity (Units in Each) - - - - - - Gross/Weapon System Cost ($ in Millions) - 0.000 12.985 52.695 - 52.695 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.000 12.985 52.695 - 52.695 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.000 12.985 52.695 - 52.695 120.688 120.688 120.688 121.299 121.299 121.299 53.136 53.136 53.136 To FY 2031 Complete 176.268 176.268 176.268 Total - 537.071 - 537.071 - 537.071 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Funding is for procurement of various Platform-in-a-Box (PIAB) and platform specific battlestation training equipment to include, but not limited to, hardware, software, licenses, peripheral equipment and subsystems, visual display system, initial spares, install, and integration of those systems into the Joint Simulation Environment (JSE) battlespace. PIABs are High-fidelity Operational Flight Program (OFP)-based, JSE-compliant/native simulators, featuring OEM-produced OFP-equivalent mission system & sensor software models capable of faithfully representing airborne platform performance. PIABs and battlestations will be used at various Joint Integrated Test & Training Center (JITTC) locations including but not limited to; Nellis AFB and Joint Base Elmendorf-Richardson, leveraging the JSE. PIABs and battlestations will support training operations, large force exercises, and local small force events. The intent is to replicate and expand the current digital test & training range capabilities allowing multiple dissimilar PIABs and battlestations to operate in a common environment without concern for airspace constraints, threat density, and outside surveillance, while protecting friendly capability Tactics, Techniques, and Procedures (TTPs) and future capabilities. Funding also procures the cockpits and interfaces to host Virtual Airborne Threat Solution - a virtual (operator-in-the-loop) threat representation capability enabling opposition force (OPFOR) to represent a broad selection of adversary aircraft based upon the particular test or training scenario. This capability incorporates Intel Center-developed, authoritative threat models with a USG-developed aircraft simulation architecture which enables aircraft capabilities and performance characteristics to be mapped to a single platform-agnostic cockpit and set of pilot-vehicle interfaces (PVI). JSE leverages 5th+ Generation Operational Test and Evaluation capability to improve TTPs in an operationally relevant environment. JITTCs support large force exercises and the United States Air Force Warfare Center, Weapons Instructor Course syllabus through Weapon School Integration. The high-fidelity simulator training to be provided by JSE improves the throughput capacity of Formal Training Unit and joint warfighter tactical readiness. Funding may also be used to address Diminishing Manufacturing Sources issues, obsolescence resolution and similar emerging requirements, as well as overarching programmatic support. This requirement (or modification) supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Funding for this exhibit is contained in PE 0207606F. LI JSE000 - Joint Simulation Environment Air Force UNCLASSIFIED Page 1 of 7 P-1 Line #9 Volume 1 - 45 === page 82 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 01: Combat Aircraft / BSA 3: Tactical Forces ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: JSE000 / Joint Simulation Environment Program Elements for Code B Items: 0207606F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Joint Simulation Environment P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 B MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 0.000 - / 12.985 - / 52.695 - / - - / 52.695 - / - - / 0.000 - / 12.985 - / 52.695 - / - - / 52.695 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Fiscal year 2027 Joint Simulation Environment (JSE) funds support the procurement of various Platform-in-a-box (PIAB) and platform specific battlestation entities to include, but not limited to, F-35, F-22, F-16, Virtual Airborne Threat System (VATS), and general hardware to support use of the PIABs and battlestations at the Joint Integrated Test & Training Centers. Funds also support the procurement of supporting battlestation hardware including but not limited to, control and reporting center, battle control center, and tactical operations center. JSE supports virtual training capability in support of joint warfighter readiness requirements across test, tactical, operational, and strategic levels. Funding in this PE invests in programs to meet Office of the Secretary of War and Chief of Staff of the Air Force initiatives to improve operational training against peer/near-peer threats for combat-coded operational units, as well as supporting High-End Advanced Tactics, Training, and Testing capability. Beginning in FY 2027, Joint Simulation Environment, Project JSE000, BA07, Aircraft support equipment and facilities, Post Production Support, Program 0207606F efforts were realigned to Joint Simulation Environment, Project JSE000 - BA01, Combat Aircraft, Joint Simulation Environment, Project 0207606F, in order to properly execute the funding for the program based on the Program's execution status within the Software Acquisition Pathway. LI JSE000 - Joint Simulation Environment Air Force UNCLASSIFIED Page 2 of 7 P-1 Line #9 Volume 1 - 46 === page 83 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: JSE000 / Joint Simulation Environment Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: Joint Simulation Environment MDAP/MAIS Code: FY 2027 Base FY 2027 OOC Procurement Quantity (Units in Each) Resource Summary Prior Years - FY 2025 - FY 2026 - - - FY 2027 Total - Gross/Weapon System Cost ($ in Millions) - 0.000 12.985 52.695 - 52.695 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.000 12.985 52.695 - 52.695 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.000 12.985 52.695 - 52.695 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Platform-in-a-Box Cost Non Recurring Cost Joint Simulation Battlestations - - - - - 0.000 - - - 0.253 14 3.543 - - - 0.253 14 3.543 - - - - - 0.000 0.590 22 12.985 2.731 18 49.152 - - - 2.731 18 49.152 - - - - - 0.000 - - 12.985 - - 52.695 - - - - - 52.695 Subtotal: Hardware Platform-in-a-Box Cost - - - - - 0.000 - - 12.985 - - 52.695 - - - - - 52.695 Gross/Weapon System Cost - - - - - 0.000 - - 12.985 - - 52.695 - - - - - 52.695 Blue Platforms and Red Air Platforms Ina-Box (†) Subtotal: Non Recurring Cost Remarks: The unit cost for Blue Platforms and Red Air Platforms In-a-Box increased to meet urgent user requirements for higher fidelity visual systems for the F-35 platform. This is critical for effective training to replicate the complexities of modern combat scenarios. The F-22 platform also demands more costly, specialized hardware and software licensing than previous simulators purchased due to the complexity and immense computing power required to perform effective training. (†) indicates the presence of a P-5a LI JSE000 - Joint Simulation Environment Air Force UNCLASSIFIED Page 3 of 7 P-1 Line #9 Volume 1 - 47 === page 84 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 Cost Elements Blue Platforms and Red Air (†) Platforms In-a-Box Blue Platforms and Red Air (†) Platforms In-a-Box (†) O O C P-1 Line Item Number / Title: JSE000 / Joint Simulation Environment Item Number / Title [DODIC]: Joint Simulation Environment FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) 2026 Various / Various Various WPAFB, OH Jan 2026 Sep 2026 22 0.590 N Oct 2025 Jan 2026 2027 Various / Various Various WPAFB, OH Jul 2027 Jan 2028 18 2.731 N Jul 2026 Jul 2026 Qty (Each) RFP Issue Date indicates the presence of a P-21 Remarks: Sole Source (SS) procurement is required for platforms due to its reliance on proprietary hardware and unique Operational Flight Programs (OFP), for which the incumbent vendors hold exclusive data rights and existing contractual agreements. LI JSE000 - Joint Simulation Environment Air Force UNCLASSIFIED Page 4 of 7 P-1 Line #9 Volume 1 - 48 === page 85 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: JSE000 / Joint Simulation Environment Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Joint Simulation Environment Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Blue Platforms and Red Air Platforms In-a-Box 1 2026 AF 22 0 22 1 2027 AF 18 0 18 A O C T LI JSE000 - Joint Simulation Environment Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 5 of 7 20 S E P O C T N O V D E C J A N F E B P-1 Line #9 M A R A P R M A Y J U N - - A - - J U L A U G 2 - 0 18 S E P Volume 1 - 49 === page 86 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: JSE000 / Joint Simulation Environment Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Joint Simulation Environment Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Fiscal Year 2029 Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Blue Platforms and Red Air Platforms In-a-Box 1 2026 AF 22 22 0 1 2027 AF 18 0 18 0 O C T LI JSE000 - Joint Simulation Environment Air Force N O V D E C 18 J A N 0 F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 7 S E P O C T N O V D E C J A N F E B P-1 Line #9 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 50 === page 87 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: JSE000 / Joint Simulation Environment Appropriation / Budget Activity / Budget Sub Activity: 3010F / 01 / 3 Item Number / Title [DODIC]: Joint Simulation Environment Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Various - Various MSR For 2027 1-8-5 For 2027 MAX For 2027 1 1 18 ALT Prior to Oct 1 ALT After Oct 1 1 Reorder Manufacturing PLT 10 6 Total After Oct 1 ALT Prior to Oct 1 16 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI JSE000 - Joint Simulation Environment Air Force UNCLASSIFIED Page 7 of 7 P-1 Line #9 Volume 1 - 51 0 === page 88 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 52 === page 89 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 02: Airlift Aircraft / BSA 2: Tactical Airlift KC046A / KC-46A MDAP ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0401221F Other Related Program Elements: 0605221F Line Item MDAP/MAIS Code: 387 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 139 15 15 15 - 15 18 18 18 18 3 259 22,701.808 2,779.618 2,749.974 3,520.530 - 3,520.530 6,011.690 6,116.345 6,174.432 6,296.780 1,742.100 58,093.277 22,701.808 22,701.808 2,779.618 2,779.618 2,749.974 2,749.974 - - 3,520.530 - - 3,520.530 - 3,520.530 - 3,520.530 6,011.690 6,011.690 6,116.345 6,116.345 6,174.432 - To FY 2031 Complete 6,296.780 - 6,174.432 6,296.780 Total 1,742.100 58,093.277 - - 1,742.100 58,093.277 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 1,254.708 206.754 343.430 266.748 - 266.748 372.880 342.870 323.230 289.750 59.300 3,459.670 Flyaway Unit Cost ($ in Millions) 150.288 171.455 169.628 199.760 - 199.760 321.917 323.513 324.367 324.159 318.367 205.594 Gross/Weapon System Unit Cost ($ in Millions) 163.322 185.308 183.332 234.702 - 234.702 333.983 339.797 343.024 349.821 580.700 224.298 Description: Replacement of the legacy tanker fleet will take place in several stages. The initial tanker replacement increment of KC-46s will replace roughly a third of the current capability. Future programs will ultimately recapitalize the entire tanker fleet over a period of more than 30 years. The Air Force completed an Analysis of Alternatives (AoA) in Apr 2006 to determine the most appropriate strategy to recapitalize the aging fleet of aerial refueling aircraft. Based on this analysis, the Air Force concluded a strategy of full and open competition to select a commercial derivative replacement tanker aircraft would result in a best value tanker contract. To initiate the first phase of the tanker replacement, the KC-46 program released a final Request for Proposal (RFP) on 24 Feb 2010, and entered source selection on 9 Jul 2010. The KC-46 program held a Milestone B (MS B) Defense Acquisition Board (DAB) on 23 Feb 2011, received approval to enter Engineering and Manufacturing Development (EMD) from the Undersecretary of Defense (Acquisition, Technology and Logistics) (USD(AT&L)) on 24 Feb 2011, and awarded the KC-46 EMD contract to Boeing on 24 Feb 2011 to develop and procure 179 KC-46 aircraft. The program is procuring four RDT&E aircraft for integration and demonstration of capability which will ultimately be operationally fielded. During production and with the recent program of record increase, the program plans to procure 184 aircraft through 13 lots. The KC-46 program held a MS C DAB on 12 Aug 2016 and received approval to enter Low Rate Initial Production (LRIP). The program awarded LRIP Lots 1 and 2 on 18 Aug 2016, LRIP Lot 3 on 27 Jan 2017, LRIP Lot 4 on 10 Sep 2018, and LRIP Lot 5 on 27 Sep 2019. Lot 6 awarded on 12 Jan 2021, Lot 7 awarded on 20 Jan 2021, Lot 8 awarded 31 Aug 2022, Lot 9 awarded 27 Jan 2023, Lot 10 awarded 23 Nov 2023, Lot 11 on 21 Nov 2024, and Lot 12 on 25 Nov 2025 bringing the total number of aircraft on production contract to 169. Initial sustainment effort was provided via Interim Contractor Support (ICS) as the program is transitioning to organic sustainment. KC-46 funding also supports Training Systems, Support Equipment, Operational Site Activation, Depot Stand-Up, Alternate Mission Equipment (AME), Direct Mission Support, Program Support Costs (PSC) activities, Other Government Costs (OGC), various studies and analyses (i.e. future efficiency and energy efficiency initiatives), future tanker replacement planning activities, long lead items, and potential Diminishing Manufacturing Sources (DMS) and obsolescence planning activities. The KC-46A has been validated at the Joint Requirements Oversight Council (JROC) multiple times from Nov 04 to Jun 25, and is a critical force extender in our Joint Warfighting Concept. In addition to its air refueling capability, the KC-46 is planned to be a key joint and coalition communications node. The KC-46 will provide the capability to fuel joint and coalition receivers via a boom or drogue system on every mission and will also augment the airlift fleet with cargo, passenger, and aeromedical evacuation capabilities. The KC-46 will operate in day, night, and adverse weather conditions to enable deployment, employment, sustainment, and redeployment of U.S. joint, allied, and coalition forces. The KC-46 will have communication, navigation, and surveillance equipment for world-wide operations; the capability to perform missions in chemical and biological environments; the ability to operate in up to medium threat environments with self-defense/protection (both active and passive) capabilities; and the necessary battle space awareness to mitigate survivability threats. The first DD250 was signed on 10 Jan 2019. The Air Force delivered the first KC-46 to McConnell Air Force Base on 25 Jan 2019. As of 3 April 2026, 105 aircraft have been delivered to the Air Force via DD250. Mobility Air Forces Connectivity Efforts: Aircraft Connectivity is a requirement for Line-of-Sight (LOS) and Beyond-Line-of-Sight (BLOS) connectivity capability on the KC-46A to provide the communications resiliency and bandwidth via integration of Multi-band, Multi-orbit SATCOM terminal and array installation to allow the selective movement between satellite constellations, resulting in higher Mbps required for the data rate pace needed for C2 in a near-peer fight. This will enable maximum Mobility Air Forces (MAF) connectivity and real-time secure command and control for aircrew situational awareness. LI KC046A - KC-46A MDAP Air Force UNCLASSIFIED Page 1 of 16 P-1 Line #10 Volume 1 - 53 === page 90 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 02: Airlift Aircraft / BSA 2: Tactical Airlift KC046A / KC-46A MDAP ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0401221F Other Related Program Elements: 0605221F Line Item MDAP/MAIS Code: 387 The Aircrew Training System (ATS) and Maintenance Training System (MTS) are being procured using KC-46 funding. The ATS contract was awarded on 1 May 2013 to Flight Safety Services Corporation, now known as Flight Safety International - Defense. The ATS contract will provide Aircrew Training Devices (ATDs), to include Weapon System Trainers (WSTs), Boom Operator Trainers (BOTs), Fuselage Trainers (FuTs), Part-Task Trainers (PTTs), and emerging technologies to meet validated Air Mobility Command (AMC) aircrew training requirements at each Main Operating Base (MOB) and the Formal Training Unit (FTU). The ATS contract will also support Distributed Mission Operations (DMO), provide aircrew instruction, develop courseware, provide logistics support, acquire a technical data package to support future competition efforts, and manage training device/courseware concurrency with the aircraft. The first nine ATS production options were exercised on 19 Aug 2015, 31 May 2017, 30 Apr 2018, 31 Mar 2019, 27 Feb 2020, 4 Mar 2021, 24 Feb 2022, 02 Feb 2023, and 30 Jan 2024. ATS definitized production option 10 in August 2024. The MTS contract was awarded 6 Jul 2016 to The Boeing Company. The MTS acquisition focuses on designing, developing, testing, producing, and fielding an optimized training system for KC-46 maintainers by integrating various forms of training media and Maintenance Training Devices (MTDs) into a "blended" solution. This blended solution includes the appropriate mix of hardware and software, "high-fidelity" Augmented Hardware Training Devices (AHTDs), Part Task Trainers (PTTs), Interactive Multimedia Instruction (IMI), and emerging technologies to meet validated AMC maintenance training requirements. An MTS initial production option for 19 Virtual Maintenance Training Systems (VMTS) classrooms was exercised on 15 Jun 2017 in support of Main Operating Base (MOB) #1's ready for training dates. In addition, on 5 Aug 2019 an option was exercised to acquire the remaining two Flight Deck Avionics Trainers (FDAT) to complete the compliment of hardware training devices for McConnell AFB (MOB #1). Advanced Wiring and Electrical Repair Training Device (AWERT) for McGuire AFB (MOB 4a) was awarded on 03 March 2023. Flight Deck/Avionics Maintenance Training Device (FDAT) and Engine/APU Maintenance Training (EAPU) for MOB 4a and 4b were awarded on 12 December 2022. DD250s for all the classrooms at MOB1 were signed and delivery was made in December 2018. MTS awarded Aerial Refueling Maintenance Training Device (ART) and Flight Controls Maintenance Training Device (FCT) options in 25 August 2023 for Joint Base McGuire-Dix-Lakehurst AFB (MOB 4a) and Travis AFB (MOB 4b). The MS B acquisition strategy planned for two LRIP lots followed by 11 Full-Rate Production (FRP) lots for a total procurement of 175 production aircraft. An update to the acquisition strategy occurred in support of MS C that increased LRIP from two to four lots, with the total aircraft buy remaining at 175 production aircraft. Various other Acquisition Decision Memorandums (ADM) have converted Lots 5-11 to LRIP as the FRP Decision has been delayed due to schedule slips to Remote Vision System and stiff boom deficiency resolution. In the FY25 President's Budget (PB), four additional production aircraft were added; the FY26 PB added five more aircraft bringing the total number of production aircraft to 184 (188 including the four EMD). Note: Initial Spares were procured with Aircraft Procurement, Air Force (APAF), Aircraft Weapon System funding in FY 2015 and transitioned to APAF, Aircraft Initial Spares and Repairs funding in FY 2016. Spare engines are included within the Initial Spares line. KC-46 is code B as it has not yet completed a Full Rate Production decision. The KC-46 program successfully completed Critical Design Review (CDR) in Aug 2013. Live Fire Testing began in Apr 2011 and completed in FY 2016. KC-46 First Flight occurred on 25 Sep 2015. Developmental Test and Evaluation (DT&E) completed in the first quarter of FY 2019 with the use of LRIP aircraft. Initial Operational Test and Evaluation (IOT&E) formally began in Oct 2019 and is still-ongoing, with completion projected in FY28, after relevant performance deficiencies are resolved, and necessary test and reporting is accomplished; as of 16 March 2026. The Tanker Production Extension will procure additional KC-46A beyond the current Program of Record's contract. Delivery of Lot 14 aircraft is expected to begin by start of Q3 FY31. The Joint Requirements Oversight Council (JROC) validated a quantity increase of the KC-46A Capability Production Document in June 2025 to support procuring up to 75 aircraft under the Tanker Production Extension effort. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), the KC-46 is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. Funding for this exhibit is contained in PE 0401221F. This requirement (or modification) supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D LI KC046A - KC-46A MDAP Air Force UNCLASSIFIED Page 2 of 16 P-1 Line #10 Volume 1 - 54 === page 91 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 02: Airlift Aircraft / BSA 2: Tactical Airlift KC046A / KC-46A MDAP ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0401221F Other Related Program Elements: 0605221F Line Item MDAP/MAIS Code: 387 Exhibits Schedule Exhibit Type Title* P-5 KC-46A MDAP P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 B MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 139 / 22,701.808 15 / 2,779.618 15 / 2,749.974 15 / 3,520.530 - / - 15 / 3,520.530 139 / 22,701.808 15 / 2,779.618 15 / 2,749.974 15 / 3,520.530 - / - 15 / 3,520.530 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 budget request supports the procurement of 15 KC-46A aircraft along with other necessary associated expenses to deliver, sustain, and maintain the Lot 13 aircraft, to include Support Equipment, Operational Site Activation, Depot Stand-Up, Interim Contractor Support, Alternate Mission Equipment (e.g., Thermal Curtains, Palletized Seating), and Direct Mission Support. It is anticipated that Lot 13 aircraft unit pricing will be higher than in previous lots due to Variation In Quantity (VIQ) pricing as well as Economic Price Adjustment (EPA) triggered by a period of higher than usual inflation. It also funds continued production of low-technical risk parts of the corrected Boom Telescope Actuator kits that require approximately 30 months to manufacture; this enables depot kit installs starting in FY 2028 during regular Cchecks. Lastly FY 2027 includes the LAIRCM GFE for Lot 14 aircraft to begin KC-46 Production Extension procurement. Program support costs activities for contractor services and other government costs are included in the FY 2027 funding. The FY 2027 funding will also support studies and analyses, potential diminishing manufacturing sources, and obsolescence solutions, to include if optimal, life of type buys or bridge buys limited to the program of record quantity. The KC-46 FY 2027 funding will include aircrew training system procurement of aircrew training devices and compulsory elements required to support aircrew training throughput levels as identified by Air Mobility Command. LI KC046A - KC-46A MDAP Air Force UNCLASSIFIED Page 3 of 16 P-1 Line #10 Volume 1 - 55 === page 92 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: KC046A / KC-46A MDAP Appropriation / Budget Activity / Budget Sub Activity: 3010F / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: KC-46A MDAP MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2026 FY 2027 Total 15 15 - 15 22,701.808 2,779.618 2,749.974 3,520.530 - 3,520.530 - - 22,701.808 Plus CY Advance Procurement ($ in Millions) - 2,779.618 - Total Obligation Authority ($ in Millions) FY 2027 OOC 15 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2027 Base 139 - 22,701.808 - 2,749.974 - 2,779.618 - 3,520.530 - 2,749.974 - - 3,520.530 - - 3,520.530 - 3,520.530 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 1,254.708 206.754 343.430 266.748 - 266.748 163.322 185.308 183.332 234.702 - 234.702 Gross/Weapon System Unit Cost ($ in Millions) Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Flyaway - Flyaway End Item Cost Non Recurring Cost (†) 139 20,105.687 - - 134.250 - - 0.000 - - 0.000 - Boom Telescope Actuator - - 56.872 1.724 63 108.643 4.449 11 48.941 AWL - - 101.263 - - 0.000 - - GFE (LAIRCM) - - 467.752 5.560 11 61.162 4.900 AME (Other) - - 24.178 - - 0.614 - RVS 2.0 Pan Sensor Hardware - - 0.000 - - 0.000 Subtotal: Non Recurring Cost - - 20,890.002 - - Subtotal: Flyaway - Flyaway End Item Cost - - 20,890.002 - Init. Spares - - 168.686 Aircrew Training Systems (ATS) - - Maintenance Training Systems (MTS) - Support Equipment - Airframe AME Wing Aerial Refueling Pod (WARP) kits 144.645 160.093 15 2,401.400 164.580 15 2,468.703 190.268 15 2,854.019 - - - 190.268 15 2,854.019 - 0.000 - - - - - 0.000 - - 69.708 - - - - - 69.708 0.000 - - 0.000 - - - - - 0.000 24.500 5.161 13 67.095 - - - 5.161 13 67.095 - 0.837 - - 5.583 - - - - - 5.583 - - 1.445 - - 0.000 - - - - - 0.000 2,571.819 - - 2,544.426 - - 2,996.405 - - - - - 2,996.405 - 2,571.819 - - 2,544.426 - - 2,996.405 - - - - - 2,996.405 - - 0.000 - - 0.000 - - 0.000 - - - - - 0.000 309.580 - - 21.576 - - 0.000 - - 117.965 - - - - - 117.965 - 43.342 - - 2.141 - - 4.683 - - 0.000 - - - - - 0.000 - 243.623 - - 15.788 - - 19.862 - - 107.432 - - - - - 107.432 5 Support - Support End Item Cost LI KC046A - KC-46A MDAP Air Force UNCLASSIFIED Page 4 of 16 P-1 Line #10 Volume 1 - 56 === page 93 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: KC046A / KC-46A MDAP Appropriation / Budget Activity / Budget Sub Activity: 3010F / 02 / 2 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: KC-46A MDAP MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Operational Site Activation - - 7.291 - - 0.000 - - 1.311 - - 1.372 - - - - - 1.372 Depot Stand-Up - - 410.195 - - 99.014 - - 123.892 - - 198.614 - - - - - 198.614 Interim Contractor Support - - 345.106 - - 0.439 - - 1.300 - - 3.631 - - - - - 3.631 Direct Mission Support - - 60.836 - - 16.046 - - 5.394 - - 19.276 - - - - - 19.276 PSC - Contractor Services - - 123.807 - - 32.385 - - 23.525 - - 27.225 - - - - - 27.225 PSC - Other Government Costs - - 99.340 - - 20.410 - - 25.581 - - 18.610 - - - - - 18.610 Aeromedical Evacuation Cargo Compartment Trainer - - 0.000 - - 0.000 - - 0.000 - - 0.000 - - - - - 0.000 Diminishing Manufacturing Sources and Material Shortages - - - - - 0.000 - - 0.000 - - 30.000 - - - - - 30.000 Subtotal: Support - Support End Item Cost - - 1,811.806 - - 207.799 - - 205.548 - - 524.125 - - - - - 524.125 139 22,701.808 15 2,779.618 15 2,749.974 15 3,520.530 - - - 15 3,520.530 Gross/Weapon System Cost 163.322 185.308 183.332 234.702 234.702 Remarks: Initial Spares were procured with Aircraft Procurement, Air Force (APAF), Aircraft Weapons System funding in FY 2015 and transitioned to APAF, Aircraft Initial Spares and Repairs funding in FY 2016. Spare engines are included within the Initial Spares line. Depot Source of Repair (DSOR) #06-038 determined Oklahoma City-Air Logistics Complex as DSOR for KC-46 in 2006. The depot will conduct aircraft maintenance checks, software maintenance, engine maintenance, and commodities maintenance. Transition to Organic Sustainment began in Summer 2022, but depot standup will continue along with a gradual transition period. The timing of the increase in depot standup funding correlates to the timing of aircraft deliveries, which began in Jan 2019. The Depot Stand-up line contains funding for Depot support equipment and Initial Operating Equipment, Software Sustainment Organic Capability Standup (SSOCS)/Government Software Integration Lab (GSIL), and Commodities Activations. Depot standup efforts increased significantly in FY 2024 primarily driven by the SSOCS/G-SIL and Commodities Activations. The G-SIL is required for organic software sustainment of the KC-46A program. The four major components of the G-SIL are defined as the software development environment (SDE), aerial refueling software development (ARSDL), unclassified government software development laboratories (GSDL), and classified GSDL which require procurement of hardware and software to emulate the KC-46 in an operational configuration and environment. Each software code update must process through the full G-SIL (SDE, ARSDL and the two GSDLs) before being authorized to upload to the aircraft. Due to program delays, Interim Contractor Support (ICS) Period 1 was extended at no cost to the government. Efforts increased significantly in FY 2027 primarily driven by the continued need for KC-46 mission support software updates. LI KC046A - KC-46A MDAP Air Force UNCLASSIFIED Page 5 of 16 P-1 Line #10 Volume 1 - 57 === page 94 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F / 02 / 2 P-1 Line Item Number / Title: KC046A / KC-46A MDAP ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: KC-46A MDAP MDAP/MAIS Code: AMC's current operational strategy is for all KC-46 aircraft to be capable of utilizing Wing Aerial Refueling Pods (WARPs), but there is currently no requirement to procure an equal number of WARPs to aircraft. Instead, the WARPs will be used on select missions, as needed. The program was initially going to procure a total of 42 WARP kits but has since reduced the requirement to 29 shipsets, adhering to a 2 Jun 2022 memo from AMC/A5/8. Flyaway cost elements (Boom Telescope Actuator, Air Worthiness Limitations (AWL), LAIRCM, & AME) have been broken out to show a lower level of detail to accurately reflect the acquisition strategy and execution of these requirements. Air Worthiness Limitations Activity are efforts to relieve limitations driven by FAA Air Worthiness Supplemental Type Certification (STC), as the STC did not adequately incorporate aerial refueling usage profiles with KC-46A acting as a receiver aircraft. This has limited the allowed hours in close proximity and number of refueling receptacle contacts when onloading fuel from another tanker's boom. AWL Activity will increase allowed hours in close proximity from 500 to 5,000 hours and receptacle contacts from 2,000 to 40,000, and the number of body fuel tank vent cycles from 1,000 to 2,400 hours. Boom Telescope Actuator funding is for the procurement of kits and installation of Category I Deficiency Correction actuators and associated components for fielded aircraft. Funding the correction of this deficiency was directed by SAF/AQ when approving the Boom Telescope Actuator Redesign (BTAR) EMD Acquisition Strategy in Mar 2019. BTAR kits require approximately 30 months to manufacture which enables installs to occur in FY 2028 during scheduled C-checks. Time to retrofit the aircraft is expected to take 5 - 7 days. The Support cost element Data, which existed in previous budget documentation, has been removed. The contract currently allows for Data as Not Separately Priced (NSP) Options which will be exercised along with each Aircraft Lot buy. Unit Cost Variations: The Airframe unit cost is based on the aircraft not to exceed (NTE) amount negotiated during the KC-46 competition. These prices and projected escalation vary from year to year, leading to variability in the unit cost. In addition, fluctuations are driven by non-recurring contract costs associated with the Production of the aircraft. (†) indicates the presence of a P-5a LI KC046A - KC-46A MDAP Air Force UNCLASSIFIED Page 6 of 16 P-1 Line #10 Volume 1 - 58 === page 95 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F / 02 / 2 FY Contractor and Location (†) 2015 Boeing / Everett C / FFP AFLCMC/WK - Tankers Aug 2016 Jan 2019 7 160.387 N Apr 2016 (†) 2016 Boeing / Everett C / FFP AFLCMC/WK - Tankers Aug 2016 Jan 2019 12 143.335 N Apr 2016 Feb 2016 (†) 2017 Boeing / Everett C / FFP AFLCMC/WK - Tankers Jan 2017 Jan 2019 15 138.367 N Apr 2016 Nov 2015 (†) 2018 Boeing / Everett C / FFP AFLCMC/WK - Tankers Sep 2018 Aug 2019 18 142.878 N May 2018 Oct 2016 (†) 2019 Boeing / Everett C / FFP AFLCMC/WK - Tankers Sep 2019 Oct 2021 15 141.502 N May 2018 Dec 2017 (†) 2020 Boeing / Everett C / FFP AFLCMC/WL - Mobiity Jan 2021 Oct 2022 12 141.864 N May 2018 Oct 2018 (†) 2021 Boeing / Everett C / FFP AFLCMC/WL - Mobiity Jan 2021 Sep 2023 16 143.416 N May 2018 Oct 2018 (†) 2022 Boeing / Everett C / FFP AFLCMC/WL - Mobiity Aug 2022 May 2025 14 149.066 N May 2018 Jul 2020 (†) 2023 Boeing / Everett C / FFP AFLCMC/WL - Mobiity Jan 2023 Apr 2026 15 150.305 N May 2018 Jul 2020 (†) 2024 Boeing / Everett C / FFP AFLCMC/WL - Mobiity Nov 2023 Apr 2027 15 155.206 N May 2018 Mar 2023 (†) 2025 Boeing / Everett C / FFP AFLCMC/WL - Mobiity Nov 2024 Feb 2028 15 160.093 N May 2018 Mar 2023 (†) 2026 Boeing / Everett C / FFP AFLCMC/WL - Mobiity Nov 2025 Dec 2028 15 164.580 N May 2018 Mar 2023 (†) 2027 Boeing / Everett C / FFP AFLCMC/WL - Mobiity Jan 2027 Oct 2029 15 190.268 N May 2018 Mar 2023 Airframe Airframe Airframe Airframe Airframe Airframe Airframe Airframe Airframe Airframe Airframe Airframe Airframe (†) Item Number / Title [DODIC]: KC-46A MDAP Method/Type or Funding Vehicle Cost Elements O O C P-1 Line Item Number / Title: KC046A / KC-46A MDAP Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date Feb 2016 indicates the presence of a P-21 Remarks: Specs Available Now: These lots are pre-negotiated options to the KC-46 EMD contract based on the current aircraft system specification. The initial product baseline established at CDR supported the MS C decision and LRIP. Boeing is responsible for the correction of any deficiencies discovered in the KC-46 weapon system components (e.g., air vehicle, support equipment, training) during EMD to include the periods of integrated test (DT, OT, FAA, AR Cert) through IOT&E or after collection of receiver certification data for seventeen (17) receiver aircraft pairings during Phase 3 AR Cert, whichever occurs later. This product baseline will be finalized and validated at the Physical Configuration Audit Update. Unit Cost Variations: The Airframe unit cost is based on the aircraft not to exceed (NTE) amount negotiated during the KC-46 competition. These prices and projected escalation vary from year to year, leading to variability in the unit cost. In addition, fluctuations are driven by non-recurring contract costs associated with the production of the aircraft. 15 aircraft were procured in Lot 8, of which 14 were procured with FY2022 funds, and 1 aircraft with FY2021 funds. As such, a total of 16 aircraft were procured with FY2021 funds, and 14 aircraft with FY2022 funds, as shown in these exhibits. However, in this P-21, the "Proc Qty" shown as awarded should be 15 aircraft awarded in 2021 (Lot 7), 15 aircraft awarded in 2022 (Lot 8) and 15 aircraft awarded in 2023 (Lot 9). In addition, the last delivery date of the 2021awarded aircraft should be November 2024, and the first delivery date of the 2022-awarded aircraft should be December 2024. LI KC046A - KC-46A MDAP Air Force UNCLASSIFIED Page 7 of 16 P-1 Line #10 Volume 1 - 59 === page 96 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: KC046A / KC-46A MDAP Appropriation / Budget Activity / Budget Sub Activity: 3010F / 02 / 2 Cost Elements (Units in Each) O O C M F R # PROC QTY Item Number / Title [DODIC]: KC-46A MDAP Fiscal Year 2016 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2015 1 OCT Calendar Year 2016 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2017 M A Y J U N Calendar Year 2017 J U L A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P FY SERVICE 1 2015 AF (1) 7 0 7 A - - - - - - - - - - - - - - 7 1 2016 AF (2) 12 0 12 A - - - - - - - - - - - - - - 12 1 2017 AF (3) 15 0 15 A - - - - - - - - - 15 1 2018 AF (4) 18 0 18 18 1 2019 AF (5) 15 0 15 15 12 0 12 12 16 0 16 16 Airframe 1 2020 AF (6) 1 2021 AF (7) 1 2022 AF 14 0 14 14 1 2023 AF 15 0 15 15 1 2024 AF 15 0 15 15 1 2025 AF 15 0 15 15 1 2026 AF 15 0 15 15 1 2027 AF 15 0 15 15 O C T LI KC046A - KC-46A MDAP Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 60 === page 97 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: KC046A / KC-46A MDAP Appropriation / Budget Activity / Budget Sub Activity: 3010F / 02 / 2 Cost Elements (Units in Each) O O C M F R # PROC QTY Item Number / Title [DODIC]: KC-46A MDAP Fiscal Year 2018 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2017 1 OCT Fiscal Year 2019 Calendar Year 2018 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2019 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E FY SERVICE 1 2015 AF (1) 7 0 7 - - - - - - - - - - - - - - - 7 0 1 2016 AF (2) 12 0 12 - - - - - - - - - - - - - - - 12 0 1 2017 AF (3) 15 0 15 - - - - - - - - - - - - - - - 15 1 2018 AF (4) 18 0 18 A - - - - - 1 2019 AF (5) 15 0 15 1 2020 AF (6) 12 0 12 12 1 2021 AF (7) 16 0 16 16 1 2022 AF 14 0 14 14 1 2023 AF 15 0 15 15 1 2024 AF 15 0 15 15 1 2025 AF 15 0 15 15 1 2026 AF 15 0 15 15 1 2027 AF 15 0 15 Airframe - - - - - 18 0 A - 15 15 O C T LI KC046A - KC-46A MDAP Air Force 0 - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 61 === page 98 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: KC046A / KC-46A MDAP Appropriation / Budget Activity / Budget Sub Activity: 3010F / 02 / 2 Cost Elements (Units in Each) O O C M F R # PROC QTY Item Number / Title [DODIC]: KC-46A MDAP Fiscal Year 2020 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2019 1 OCT Calendar Year 2020 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2021 M A Y J U N J U L Calendar Year 2021 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P FY SERVICE 1 2015 AF (1) 7 7 0 0 1 2016 AF (2) 12 12 0 0 1 2017 AF (3) 15 15 0 0 1 2018 AF (4) 18 18 0 1 2019 AF (5) 15 0 15 1 2020 AF (6) 12 0 1 2021 AF (7) 16 0 1 2022 AF 14 0 14 14 1 2023 AF 15 0 15 15 1 2024 AF 15 0 15 15 1 2025 AF 15 0 15 15 1 2026 AF 15 0 15 15 1 2027 AF 15 0 15 Airframe 0 - - - - - - - - - - 15 12 A - - - - - - - - - 12 16 A - - - - - - - - - 16 - - - - - - - - - - - - - 15 O C T LI KC046A - KC-46A MDAP Air Force - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 62 === page 99 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: KC046A / KC-46A MDAP Appropriation / Budget Activity / Budget Sub Activity: 3010F / 02 / 2 Cost Elements (Units in Each) O O C M F R # PROC QTY Item Number / Title [DODIC]: KC-46A MDAP Fiscal Year 2022 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2021 1 OCT Calendar Year 2022 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2023 M A Y J U N J U L Calendar Year 2023 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P FY SERVICE 1 2015 AF (1) 7 7 0 0 1 2016 AF (2) 12 12 0 0 1 2017 AF (3) 15 15 0 0 1 2018 AF (4) 18 18 0 1 2019 AF (5) 15 0 15 12 0 12 16 0 16 Airframe 0 6 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - A - - - - - - - - - - - - - - 9 - - - - - - - - - - - - - - - - - - - - - - - 14 A - - - - - - - - - 15 1 2020 AF (6) 1 2021 AF (7) 1 2022 AF 14 0 14 1 2023 AF 15 0 15 1 2024 AF 15 0 15 15 1 2025 AF 15 0 15 15 1 2026 AF 15 0 15 15 1 2027 AF 15 0 15 11 1 15 15 O C T LI KC046A - KC-46A MDAP Air Force 1 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 63 === page 100 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: KC046A / KC-46A MDAP Appropriation / Budget Activity / Budget Sub Activity: 3010F / 02 / 2 Cost Elements (Units in Each) O O C M F R # PROC QTY Item Number / Title [DODIC]: KC-46A MDAP Fiscal Year 2024 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2023 1 OCT Calendar Year 2024 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2025 M A Y J U N J U L Calendar Year 2025 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P FY SERVICE 1 2015 AF (1) 7 7 0 0 1 2016 AF (2) 12 12 0 0 1 2017 AF (3) 15 15 0 0 1 2018 AF (4) 18 18 0 1 2019 AF (5) 15 6 9 12 1 11 16 1 15 Airframe 0 - - - - - - - - - - - - - - - - - - 1 8 1 2020 AF (6) 1 2021 AF (7) 1 2022 AF 14 0 14 - - - - - - - - - - - - - - - - - - - 1 2023 AF 15 0 15 - - - - - - - - - - - - - - - - - - - - - - - - 15 1 2024 AF 15 0 15 A - - - - - - - - - - - - - - - - - - - - - - - 15 1 2025 AF 15 0 15 A - - - - - - - - - - - 15 1 2026 AF 15 0 15 1 2027 AF 15 0 15 11 15 2 1 1 1 8 15 15 O C T LI KC046A - KC-46A MDAP Air Force 1 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 12 of 16 S E P O C T N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 64 === page 101 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: KC046A / KC-46A MDAP Appropriation / Budget Activity / Budget Sub Activity: 3010F / 02 / 2 Cost Elements (Units in Each) O O C M F R # PROC QTY Item Number / Title [DODIC]: KC-46A MDAP Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P FY SERVICE 1 2015 AF (1) 7 7 0 0 1 2016 AF (2) 12 12 0 0 1 2017 AF (3) 15 15 0 0 1 2018 AF (4) 18 18 0 0 1 2019 AF (5) 15 7 8 8 12 1 11 11 16 1 15 Airframe 1 2020 AF (6) 1 2021 AF (7) 1 2022 AF 14 6 8 - 1 2023 AF 15 0 15 - - - - - - 1 2024 AF 15 0 15 - - - - - - - - - - - - - - - - - - 1 2025 AF 15 0 15 - - - - - - - - - - - - - - - - - - - - - - - - 15 1 2026 AF 15 0 15 A - - - - - - - - - - - - - - - - - - - - - - - 15 1 2027 AF 15 0 15 A - - - - - - - - - 15 15 O C T LI KC046A - KC-46A MDAP Air Force 1 N O V 2 D E C 1 J A N 2 F E B 1 M A R 1 0 1 A P R - M A Y 1 J U N 2 J U L 1 A U G UNCLASSIFIED Page 13 of 16 2 S E P 2 O C T 1 N O V 2 D E C 1 J A N 1 F E B P-1 Line #10 1 M A R 0 2 A P R - M A Y 2 J U N 2 J U L 1 A U G 2 6 S E P Volume 1 - 65 === page 102 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: KC046A / KC-46A MDAP Appropriation / Budget Activity / Budget Sub Activity: 3010F / 02 / 2 Cost Elements (Units in Each) O O C M F R # PROC QTY Item Number / Title [DODIC]: KC-46A MDAP Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P FY SERVICE 1 2015 AF (1) 7 7 0 0 1 2016 AF (2) 12 12 0 0 1 2017 AF (3) 15 15 0 0 1 2018 AF (4) 18 18 0 0 1 2019 AF (5) 15 7 8 8 12 1 11 11 16 1 15 15 0 Airframe 1 2020 AF (6) 1 2021 AF (7) 1 2022 AF 14 14 0 1 2023 AF 15 15 0 1 2024 AF 15 9 6 1 2025 AF 15 0 15 - - - - 1 2026 AF 15 0 15 - - - - - - - - - - - - 1 2027 AF 15 0 15 - - - - - - - - - - - - 0 2 O C T LI KC046A - KC-46A MDAP Air Force 1 N O V 2 D E C 1 J A N 0 2 F E B 1 M A R 2 A P R 1 M A Y 2 J U N 1 J U L 1 A U G UNCLASSIFIED Page 14 of 16 2 S E P 2 O C T - 1 - - 1 - N O V 0 1 D E C 2 J A N 1 F E B P-1 Line #10 2 M A R 1 A P R 2 M A Y 1 J U N 2 J U L 1 A U G - 1 15 S E P Volume 1 - 66 === page 103 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: KC046A / KC-46A MDAP Appropriation / Budget Activity / Budget Sub Activity: 3010F / 02 / 2 Cost Elements (Units in Each) O O C M F R # PROC QTY Item Number / Title [DODIC]: KC-46A MDAP Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E FY SERVICE 1 2015 AF (1) 7 7 0 0 1 2016 AF (2) 12 12 0 0 1 2017 AF (3) 15 15 0 0 1 2018 AF (4) 18 18 0 0 1 2019 AF (5) 15 7 8 8 12 1 11 11 16 1 15 15 Airframe 1 2020 AF (6) 1 2021 AF (7) 1 2022 AF 14 14 0 0 1 2023 AF 15 15 0 0 1 2024 AF 15 15 0 0 1 2025 AF 15 15 0 1 2026 AF 15 14 1 1 1 2027 AF 15 0 15 1 0 O C T LI KC046A - KC-46A MDAP Air Force 0 1 N O V 2 D E C 1 J A N 1 F E B 1 M A R 2 A P R 1 M A Y 1 J U N 1 J U L 1 A U G UNCLASSIFIED Page 15 of 16 2 S E P O C T N O V D E C J A N F E B P-1 Line #10 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 67 === page 104 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: KC046A / KC-46A MDAP Appropriation / Budget Activity / Budget Sub Activity: 3010F / 02 / 2 Item Number / Title [DODIC]: KC-46A MDAP Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 12 15 15 1 Boeing - Everett ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 Total After Oct 1 0 ALT Prior to Oct 1 0 ALT After Oct 1 0 Manufacturing PLT 4 Total After Oct 1 33 37 Remarks: Minimum Sustaining Rate (MSR) for production is 12 aircraft/year. Economic Rate does not reflect 1 shift of 8 hours 5 days a week; aligns to Boeing's operating plan (2 shifts of 8 hours each 5 days a week). Admin Lead Time to definitize Not to Exceed (NTE) production options is 18-24 months; definitization of NTE does not have to occur prior to option award. Aircraft acceptance dates in above schedule reflect date of DD Form 250, Material Inspection and Receiving Report, not date of ferry flight from vendor's production facility to Air Force assigned operating location. Production deliveries exceeding the 12 month period: Boeing made a business decision to build aircraft at risk, ahead of contract award, in order to meet original contract requirements to deliver Required Assets Available (RAA) of 18 aircraft by August 2017. These 18 aircraft are part of Lot 1, Lot 2, and Lot 3. Due to continued KC-46 design changes during development, aircraft in Lot 1 required significant change incorporation to bring them up to the production baseline. This change incorporation delayed Lot 1 aircraft deliveries. The first aircraft deliveries occurred on 25 Jan 2019. 15 aircraft were procured in Lot 8, of which 14 were procured with FY2022 funds, and 1 aircraft with FY2021 funds. As such, a total of 16 aircraft were procured with FY2021 funds, and 14 aircraft with FY2022 funds, as shown in these exhibits. However, in this P-21, the "Proc Qty" shown as awarded should be 15 aircraft awarded in 2021 (Lot 7), 15 aircraft awarded in 2022 (Lot 8), 15 aircraft awarded in 2023 (Lot 9), and 15 aircraft awarded in 2024 (Lot 10). In addition, the last delivery date of the 2021-awarded aircraft should be November 2024, and the first delivery date of the 2022-awarded aircraft should be December 2024. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (1) (2) (3) (4) (5) (6) (7) Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. LI KC046A - KC-46A MDAP Air Force UNCLASSIFIED Page 16 of 16 P-1 Line #10 Volume 1 - 68 === page 105 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 02: Airlift Aircraft / BSA 3: Other Airlift ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: C130J0 / C-130J Program Elements for Code B Items: N/A Other Related Program Elements: 0207224F, 0207230F, 0207237F Line Item MDAP/MAIS Code: 220 Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 226 1 7 21,673.121 414.005 1,191.000 21,673.121 21,673.121 414.005 414.005 1,191.000 1,191.000 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 0.000 0.000 0.000 0.000 636.680 636.680 636.680 - 636.680 636.680 636.680 115.100 115.100 115.100 To FY 2031 Complete Total 234 24,029.906 - - - 0.000 0.000 0.000 0.000 0.000 0.000 24,029.906 - - - 0.000 0.000 0.000 0.000 0.000 0.000 24,029.906 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - Flyaway Unit Cost ($ in Millions) 78.006 - 132.400 - 150.429 - - - - - - - - - 80.405 Gross/Weapon System Unit Cost ($ in Millions) 95.899 414.005 170.143 - - - - - - - - 102.692 Description: The C-130J is a medium-size transport aircraft capable of performing a variety of combat delivery (tactical airlift) operations across a broad range of mission environments. The C-130J aircraft, with its extended (by 15 ft) fuselage, provides additional cargo carrying capacity for the USAF combat delivery mission compared with legacy C-130E/Hs and the C-130J (short). Other variants of the USAF C-130J fleet are all short-bodied aircraft and include the WC-130J (weather reconnaissance), HC-130J (combat search and rescue), MC-130J (special operations), and the AC-130J (close air support and armed reconnaissance). The HC-130J, MC-130J, and AC-130J variants are addressed in their own budget documents. 17 C-130Js were procured with National Guard, Reserve Equipment Account (NGREA) funds early in the program. Program funding, including Congressional Add funding, includes efforts related to, but not limited to, Diminishing Manufacturing Sources (DMS), Depot Activation, Production cut-ins, Program Support Costs, Initial Spares, and Studies and/or Risk Reduction efforts for aircraft, readiness spares, engines and propellers. Material Improvement Program funds DMS solutions on productions to the fielded aircraft to ensure a homogenous C-130J fleet. This program includes costs for the following C-130J aircraft variants: C-130J stretch aircraft, C-130J short aircraft, WC-130J aircraft, and LC-130J aircraft. Funding for this exhibit is contained in PE 0401132F. The FY 2026 spend plan amount for Aircraft Procurement includes $1,191,000 thousand of discretionary and $287,060 thousand of mandatory (reconciliation) for a total of $1,478,060. Discretionary funding provides 6 C-130J and 1 LC-130J aircraft. Mandatory funding will procure 1 C-130J, Diminishing Manufacturing Sources (DMS) and spares (engine, propeller, and aircraft). Congress added 6 C-130Js in FY26 as well as 1 C-130J in FY25. This, in addition to the 1 reconciliation C-130J in FY26 will be one ANG squadron of 8 C-130Js, basing is TBD. LI C130J0 - C-130J Air Force UNCLASSIFIED Page 1 of 4 P-1 Line #11 Volume 1 - 69 === page 106 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 02: Airlift Aircraft / BSA 3: Other Airlift ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: C130J0 / C-130J Program Elements for Code B Items: N/A Other Related Program Elements: 0207224F, 0207230F, 0207237F Line Item MDAP/MAIS Code: 220 Exhibits Schedule Exhibit Type Title* P-5 C-130J P-40 Total Gross/Weapon System Cost Subexhibits ID CD A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 226 / 21,673.121 1 / 414.005 7 / 1,191.000 - / 636.680 - / - - / 636.680 226 / 21,673.121 1 / 414.005 7 / 1,191.000 - / 636.680 - / - - / 636.680 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY 2027 request includes funding for DMS, readiness kits, spares (engine, prop, aircraft) and a Weapon System Trainer. LI C130J0 - C-130J Air Force UNCLASSIFIED Page 2 of 4 P-1 Line #11 Volume 1 - 70 === page 107 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: C130J0 / C-130J Appropriation / Budget Activity / Budget Sub Activity: 3010F / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: C-130J MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2026 226 1 7 21,673.121 414.005 1,191.000 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) - 21,673.121 Plus CY Advance Procurement ($ in Millions) - 636.680 - - - 1,191.000 636.680 - 636.680 - 414.005 FY 2027 Total - - 1,191.000 - 21,673.121 FY 2027 OOC - - 414.005 - Total Obligation Authority ($ in Millions) FY 2027 Base 636.680 - 636.680 - - 636.680 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - Gross/Weapon System Unit Cost ($ in Millions) - 95.899 - 414.005 170.143 - - - - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Flyaway - Flyaway End Item Cost Recurring Cost Airframe 75.983 226 17,172.254 Other Government Furnished Equipment - - 457.167 LC-130J - - Subtotal: Recurring Cost - - Subtotal: Flyaway - Flyaway End Item Cost - Airframe Peculiar Ground Support Equipment (PGSE) 128.000 1 128.000 144.000 6 864.000 - - 0.000 - - - - - 0.000 - - - 4.400 4.000 6 24.000 - - - - - - - - - - - 165.000 1 165.000 - - - - - - - - - 17,629.421 - - 132.400 - - 1,053.000 - - 0.000 - - - - - 0.000 - 17,629.421 - - 132.400 - - 1,053.000 - - 0.000 - - - - - 0.000 - - 23.872 - - - - - 5.000 - - - - - - - - - Peculiar Training Equipment - - 319.524 - - - - - - - - - - - - - - - Engineering and Logistics Services - - 84.218 - - 6.000 - - 30.000 - - - - - - - - - Diminishing Manufacturing Sources (DMS) - - 733.249 - - 122.000 - - 50.000 - - - - - - - Interim Contractor Support (ICS) - - 103.904 - - - - - - - - - - - - - - - Interim Supply Support (ISS) (Spares) - - 1,046.835 - - 1.800 - - 24.000 - - - - - - - - - Post Delivery Support - - 183.450 - - 2.400 - - 9.000 - - - - - - - - - - Support - Support End Item Cost LI C130J0 - C-130J Air Force UNCLASSIFIED Page 3 of 4 201.750 P-1 Line #11 201.750 Volume 1 - 71 === page 108 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: C130J0 / C-130J Appropriation / Budget Activity / Budget Sub Activity: 3010F / 02 / 3 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: C-130J MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Organic Depot Support - - 34.110 - - - - - - - - - - - - - - - Program Support Costs - - 157.531 - - - - - 5.000 - - 5.000 - - - - - 5.000 Product/Other Support - - 4.363 - - - - - - - - - - - - - - - Alternate Mission Equipment - - 6.258 - - 1.100 - - 15.000 - - - - - - - - - Other - - 1,346.386 - - - - - - - - - - - - - - Engine/Propreller Spares - - - - - - - - - - 236.750 - - - - - Weapon Systems Trainers - - - - - - - - - - - 45.000 - - - - - 45.000 Readiness Spares - - - - - - - - - - - 118.180 - - - - - 118.180 Material Improvement Program - - - - - - - - - - - 30.000 - - - - - 30.000 Subtotal: Support - Support End Item Cost - - 4,043.700 - - - - 138.000 - - 636.680 - - - - - 636.680 Gross/Weapon System Cost 95.899 226 21,673.121 1,191.000 - - 636.680 - - - - - 636.680 414.005 148.305 281.605 1 414.005 170.143 7 236.750 Remarks: The LC-130J will be a short variant (15 feet less than the standard combat delivery C-130J). LI C130J0 - C-130J Air Force UNCLASSIFIED Page 4 of 4 P-1 Line #11 Volume 1 - 72 === page 109 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: APT000 / Advanced Pilot Training T-7A AP Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 03: Trainer Aircraft / BSA 1: UPT Trainers ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0804701F Other Related Program Elements: 0605223F Line Item MDAP/MAIS Code: 436 Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - 14 23 - 23 36 42 60 60 107 342 9.513 20.780 362.083 529.464 - 529.464 985.169 947.183 1,223.252 1,105.603 2,361.247 7,544.294 Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Total - 0.000 0.000 0.000 - 0.000 69.690 72.040 101.490 100.850 100.980 445.050 9.513 20.780 362.083 529.464 - 529.464 915.479 875.143 1,121.762 1,004.753 2,260.267 7,099.244 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) To FY 2031 Complete - 0.000 0.000 69.690 - 69.690 72.040 101.490 100.850 100.980 9.513 20.780 362.083 599.154 - 599.154 987.519 976.633 1,222.612 1,105.733 2,260.267 - 7,544.294 445.050 143.721 505.956 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 19.638 43.000 41.279 - 41.279 55.049 56.068 72.890 74.311 Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - 25.863 23.020 - 23.020 27.366 22.552 20.388 18.427 22.068 22.059 Description: The Advanced Pilot Training (APT)/ T-7A Red Hawk program will replace the Air Education Training Commands (AETC) aging T-38C fleet with new aircraft, Ground Based Training Systems (simulators, training devices, computer based training systems, academics, etc.), Maintenance Training Systems, and support infrastructure currently used in the Advanced Fighter/Bomber Fundamentals Course. The APT/T-7A Red Hawk program acquisition strategy was approved by OUSW (A&S) in early FY 2017 (December 2016). The Program completed source selection evaluations and Milestone B in September 2018 and awarded a Fixed Price Incentive Firm Indefinite Delivery /Indefinite Quantity contract to The Boeing Company on 27 September 2018. Critical Design Review was completed in August 2020. An updated acquisition strategy was approved by the Air Force Senior Acquisition Authority in February 2026 approving a strategy to persue Advance Procurement beginning in FY27. Milestone C is currently projected for 3Q FY 2026 with the first Low-Rate Initial Production deliveries anticipated in 3Q FY 2027. Funding Contained in this platform's documentation directly aids AETC flying training enterprise to continue its overall pilot production increase to reduce the USAF Pilot Shortage. This requirement supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Funding may be used to address Diminishing Manufacturing Sources/Material Shortage (DMSMS) issues. Funding for this exhibit contained in PE 0804701F. LI APT000 - Advanced Pilot Training T-7A AP Air Force UNCLASSIFIED Page 1 of 8 P-1 Line #12 Volume 1 - 73 === page 110 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: APT000 / Advanced Pilot Training T-7A AP Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 03: Trainer Aircraft / BSA 1: UPT Trainers ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0804701F Other Related Program Elements: 0605223F Line Item MDAP/MAIS Code: 436 Exhibits Schedule Exhibit Type Title* P-5 Advanced Pilot Training T-7A AP P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 B MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / 9.513 - / 20.780 14 / 362.083 23 / 529.464 - / - 23 / 529.464 - / 9.513 - / 20.780 14 / 362.083 23 / 529.464 - / - 23 / 529.464 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: The FY27 budget request procures 23 Low-Rate Initial Production (LRIP) Lot 2 aircraft and associated Ground Based Training System (GBTS). Funding also provides for essential program support, support equipment, other government costs, and interim contractor support to ensure a smooth transition and fielding. LI APT000 - Advanced Pilot Training T-7A AP Air Force UNCLASSIFIED Page 2 of 8 P-1 Line #12 Volume 1 - 74 === page 111 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: APT000 / Advanced Pilot Training T-7A AP Appropriation / Budget Activity / Budget Sub Activity: 3010F / 03 / 1 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: Advanced Pilot Training T-7A AP MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2025 FY 2026 - - 9.513 20.780 FY 2027 Base FY 2027 OOC FY 2027 Total 14 23 - 23 362.083 529.464 - 529.464 - 0.000 0.000 0.000 - 0.000 9.513 20.780 362.083 529.464 - 529.464 - 0.000 0.000 69.690 - 69.690 9.513 20.780 362.083 599.154 - 599.154 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) Gross/Weapon System Unit Cost ($ in Millions) 0.000 19.638 43.000 41.279 - 41.279 - - 25.863 23.020 - 23.020 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Vehicles - Advanced Trainer Replacement T-7A Cost Recurring Cost (†) Air Vehicle - - - - - - 21.688 14 303.630 15.763 23 362.553 - - - 15.763 23 Other Flyaway Costs - - - - - - - - 0.000 - - 3.348 - - - - - 3.348 Subtotal: Recurring Cost - - - - - - - - 303.630 - - 365.901 - - - - - 365.901 - - - - - - - - 303.630 - - 365.901 - - - - - 365.901 Subtotal: Vehicles - Advanced Trainer Replacement T-7A Cost 362.553 Support - Advanced Trainer Replacement T-7A Cost Training - - - - - 10.328 - - 4.588 - - 52.019 - - - - - 52.019 Other Government Costs - - 1.390 - - 0.825 - - 7.164 - - 30.438 - - - - - 30.438 Support Equipment - - 8.123 - - 9.627 - - 17.830 - - 31.588 - - - - - 31.588 Interim Contractor Support - - - - - - - - 28.871 - - 49.518 - - - - - 49.518 Subtotal: Support Advanced Trainer Replacement T-7A Cost - - 9.513 - - 20.780 - - 58.453 - - 163.563 - - - - - 163.563 Gross/Weapon System Cost - - 9.513 - - 20.780 25.863 14 362.083 23.020 23 529.464 - - - 23.020 23 529.464 (†) indicates the presence of a P-5a LI APT000 - Advanced Pilot Training T-7A AP Air Force UNCLASSIFIED Page 3 of 8 P-1 Line #12 Volume 1 - 75 === page 112 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F / 03 / 1 Item Number / Title [DODIC]: Advanced Pilot Training T-7A AP FY Contractor and Location Method/Type or Funding Vehicle (†) 2026 Boeing / St. Louis C / FPIF AFLCMC/WN - Training May 2026 Apr 2027 14 21.688 N Mar 2026 (†) 2027 Boeing / St. Louis C / FPIF AFLCMC/WN - Training Mar 2027 Mar 2029 23 15.763 N Mar 2026 2027 Boeing / St. Louis C / FPIF AFLCMC/WN - Training Mar 2027 Mar 2029 36 1.936 N Mar 2026 Cost Elements Air Vehicle Air Vehicle O O C P-1 Line Item Number / Title: APT000 / Advanced Pilot Training T-7A AP Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty (Each) RFP Issue Date Advance Procurement Air Vehicle: CFE: Long Lead Materials (†) indicates the presence of a P-21 LI APT000 - Advanced Pilot Training T-7A AP Air Force UNCLASSIFIED Page 4 of 8 P-1 Line #12 Volume 1 - 76 === page 113 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: APT000 / Advanced Pilot Training T-7A AP Appropriation / Budget Activity / Budget Sub Activity: 3010F / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Advanced Pilot Training T-7A AP Fiscal Year 2026 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2025 1 OCT Calendar Year 2026 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2027 M A Y J U N J U L Calendar Year 2027 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Air Vehicle 1 2026 AF 14 0 14 1 2027 AF 23 0 23 A - - - - - - - - - - - 1 A O C T N O V LI APT000 - Advanced Pilot Training T-7A AP Air Force D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 5 of 8 S E P O C T N O V D E C J A N F E B P-1 Line #12 M A R 1 A P R 2 M A Y 1 J U N 1 J U L 1 A U G - 7 23 S E P Volume 1 - 77 === page 114 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: APT000 / Advanced Pilot Training T-7A AP Appropriation / Budget Activity / Budget Sub Activity: 3010F / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Advanced Pilot Training T-7A AP Fiscal Year 2028 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2027 1 OCT Calendar Year 2028 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2029 M A Y J U N J U L Calendar Year 2029 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Air Vehicle 1 2026 AF 14 7 7 1 2027 AF 23 0 23 1 1 O C T 1 N O V LI APT000 - Advanced Pilot Training T-7A AP Air Force 1 D E C 2 J A N 1 F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 8 S E P O C T N O V D E C J A N F E B P-1 Line #12 1 M A R 2 A P R 2 M A Y 2 J U N 2 J U L 2 A U G 2 10 S E P Volume 1 - 78 === page 115 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: APT000 / Advanced Pilot Training T-7A AP Appropriation / Budget Activity / Budget Sub Activity: 3010F / 03 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Advanced Pilot Training T-7A AP Fiscal Year 2030 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2029 1 OCT Fiscal Year 2031 Calendar Year 2030 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2031 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Air Vehicle 1 2026 AF 14 13 1 1 2027 AF 23 13 10 1 2 O C T 2 N O V LI APT000 - Advanced Pilot Training T-7A AP Air Force 2 D E C 2 J A N 2 F E B 0 M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 8 S E P O C T N O V D E C J A N F E B P-1 Line #12 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 79 === page 116 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: APT000 / Advanced Pilot Training T-7A AP Appropriation / Budget Activity / Budget Sub Activity: 3010F / 03 / 1 Production Rates (Each / Year) MFR Ref # Item Number / Title [DODIC]: Advanced Pilot Training T-7A AP Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Boeing - St. Louis MSR For 2027 1-8-5 For 2027 MAX For 2027 12 23 23 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 ALT After Oct 1 7 Manufacturing PLT 6 Total After Oct 1 24 30 Remarks: Delivery schedule reflects contractual requirement for lot 1 and lot 2 aircraft deliveries. Lot 1 delivery dates are established in contract and reflected in the P-21 production schedule. Lot 2 aircraft will be delivered beginning 24 months after award. This creates a 13-month gap in the delivery schedule. "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI APT000 - Advanced Pilot Training T-7A AP Air Force UNCLASSIFIED Page 8 of 8 P-1 Line #12 Volume 1 - 80 === page 117 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 03: Trainer Aircraft / BSA 1: UPT Trainers P-1 Line Item Number / Title: APT000 / Advanced Pilot Training T-7A AP Program Elements for Code B Items: 0804701F Other Related Program Elements: 0605223F Line Item MDAP/MAIS Code: 436 Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Gross/Weapon System Cost ($ in Millions) - 0.000 0.000 69.690 - 69.690 72.040 101.490 100.850 100.980 - 445.050 Net Procurement (P-1) ($ in Millions) - 0.000 0.000 69.690 - 69.690 72.040 101.490 100.850 100.980 - 445.050 Total Obligation Authority ($ in Millions) - 0.000 0.000 69.690 - 69.690 72.040 101.490 100.850 100.980 - 445.050 Description: The Advanced Pilot Training (APT)/ T-7A Red Hawk program will replace the Air Education Training Commands (AETC) aging T-38C fleet with new aircraft, Ground Based Training Systems (simulators, training devices, computer based training systems, academics, etc.), Maintenance Training Systems (which will be procured via a separate contracting action), and support infrastructure currently used in the Advanced Fighter/Bomber Fundamentals Course. FY 2027 Advanced Pilot Training T-7A Advanced Procurement funding will support T-7A air vehicle long lead parts and materials necessary to protect delivery schedule. Advanced procurement funding will be used towards the air vehicle suppliers/systems based on the long lead time associated with material. This program, Advanced Pilot Training T-7A Advanced Procurement, is a new start. LI APT000 - Advanced Pilot Training T-7A AP Air Force UNCLASSIFIED Page 1 of 4 P-1 Line #13 Volume 1 - 81 === page 118 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 03: Trainer Aircraft / BSA 1: UPT Trainers P-1 Line Item Number / Title: APT000 / Advanced Pilot Training T-7A AP Program Elements for Code B Items: 0804701F Other Related Program Elements: 0605223F Line Item MDAP/MAIS Code: 436 Exhibits Schedule Exhibit Type Title* ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-10 Advanced Pilot Training T-7A AP - / - - / 0.000 14 / 0.000 23 / 69.690 - / - 23 / 69.690 P-40 Total Gross/Weapon System Cost - / - - / 0.000 14 / 0.000 23 / 69.690 - / - 23 / 69.690 *Title represents the P-10 Title for Advance Procurement. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 budget requests advanced procurement (AP) funding to be used towards Air Vehicle suppliers/systems based on the extended lead times associated with the materials for Lot 3 aircraft in FY 2028. LI APT000 - Advanced Pilot Training T-7A AP Air Force UNCLASSIFIED Page 2 of 4 P-1 Line #13 Volume 1 - 82 === page 119 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 1 - Budget Funding Justification): PB 2027 Air Force Date: April 2026 P-1 Line Item Number / Title: APT000 / Advanced Pilot Training T-7A AP Appropriation / Budget Activity / Budget Sub Activity: 3010F / 03 / 1 First System (2027) Award Date: March 2027 First System (2027) Completion Date: March 2030 Advanced Pilot Training T-7A AP Production Leadtime Quantity Interval Between Systems: 0 Months Prior Years (Months) FY 2025 (Each) 24 When Required Cost Elements FY 2026 (Each) Prior Years (Months) P-5 Number / Title: Advanced Pilot Training T-7A AP FY 2025 ($ M) FY 2027 (Each) (Each) 14 FY 2026 ($ M) 23 FY 2027 ($ M) ($ M) CFE Air Vehicle: CFE: Long Lead Materials (†) - 12 - - 69.690 Total: CFE - - - 69.690 Total Advance Procurement/Obligation Authority - 0.000 0.000 69.690 LI APT000 - Advanced Pilot Training T-7A AP Air Force UNCLASSIFIED Page 3 of 4 P-1 Line #13 Volume 1 - 83 === page 120 === UNCLASSIFIED Exhibit P-10, Advance Procurement Requirements Analysis (page 2 - Budget Funding Justification): PB 2027 Air Force Date: April 2026 Appropriation / Budget Activity / Budget Sub Activity: 3010F / 03 / 1 P-1 Line Item Number / Title: APT000 / Advanced Pilot Training T-7A AP P-5 Number / Title: Advanced Pilot Training T-7A AP FY 2027 Cost Elements Production Leadtime QPA Unit Cost (Months) (Each) ($ M) Contract Forecast Date 2027 Qty For FY (Each) Total Cost Request ($ M) CFE Air Vehicle: CFE: Long Lead Materials (†) - 12 1.936 Mar 2027 36 2028 69.690 Total: CFE 69.690 Total Advance Procurement/Obligation Authority 69.690 Description: 2027 AP funding will be used towards the following Air Vehicle suppliers/systems based on the lead time associated with the material such as: GE Engine; Saab T-7 Aft Fuselage; Qarbon Forward Fuselage Assembly, Stability Flap Actuator, Vertical Assembly, Horizonal Assembly, Wing Assembly; Collins Ejection Seat; Elbit Large Area Display, Heads Up Display (HUD), HUD Camera, HUD Tray, Up Front Control Display, Data Transfer Unit, Electronic Flight Display; Woodward Rudder Actuator, Controller Side Stick, Rudder Pedal Assembly; Rohde & Schwarz UHF/VHF Radio; Eaton Mission Systems On Board Oxygen Generating System Concentrator; L3Harris Computer (T3CAS); Honeywell Controller, Primary Heat Exchanger, Secondary Heat Exchanger; PPG Transparency, Blast Shield; Pacific Scientific Energetic Canopy Fracture System Kit. (†) indicates the presence of Contract Data presented in the associated P-5 Item's P-5a exhibit. LI APT000 - Advanced Pilot Training T-7A AP Air Force UNCLASSIFIED Page 4 of 4 P-1 Line #13 Volume 1 - 84 === page 121 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 04: Other Aircraft / BSA 1: Helicopters ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: H0106O / MH-139A Program Elements for Code B Items: 0102110F Other Related Program Elements: 0102110F Line Item MDAP/MAIS Code: 562 Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 8 2 4 - 4 7 3 553.190 279.095 67.428 252.949 - 252.949 310.278 146.005 553.190 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2027 Base FY 2026 20 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2025 553.190 279.095 279.095 67.428 - 67.428 - 252.949 - - 252.949 - 252.949 - 252.949 310.278 310.278 146.005 146.005 To FY 2031 Complete Total - - - 44 10.087 10.284 - 1,629.316 - - - 10.087 10.284 - 1,629.316 - - - 10.087 10.284 - 1,629.316 - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 31.567 34.393 4.888 0.973 - 0.973 1.900 12.053 25.272 25.777 - 136.823 Flyaway Unit Cost ($ in Millions) 18.953 18.081 28.510 22.340 - 22.340 19.886 21.271 - - - 20.106 Gross/Weapon System Unit Cost ($ in Millions) 27.660 34.887 33.714 63.237 - 63.237 44.325 48.668 - - - 37.030 Description: The MH-139A program will replace the Air Force fleet of UH-1N aircraft, which have significant capability gaps in speed, range, endurance, payload capacity, and aircraft self-protection. The program of record is 56 aircraft, including 8 total Aircrew Training Devices (ATDs), and associated support equipment. The replacement aircraft will provide a vertical airlift and support the requirements for Air Force Global Strike Command (AFGSC) and Air Force Reserve Command (AFRC). AFGSC is the Air Force lead command and operational capability requirements sponsor. This program is an element of the Air Force's nuclear enterprise reform initiatives. This requirement supports the performance of a full financial audit as required by Title 10 U.S.C. Chapter 9A, Sec 240-D Funding for this exhibit contained in PE 0102110F. Projected Milestone Dates are as follows: Full Rate Production: August 2026; Initial Operational Capability: August 2026 In accordance with Section 1815 of the FY08 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. Funding can be utilized to resolve issues related to Diminishing Manufacturing Sources (DMS). Depot Source Of Repair (DSOR) decision received Sep 2022. The decision outlines Fleet Readiness Center East for Dynamic and Structural hardware components; Ogden ALC, Warner Robbins ALC, and Oklahoma City ALC for LRU hardware and software; Warner Robins ALC for software sustainment; and finally, JBSA-Lackland for cryptographic hardware work. Additionally, the sustainment business case analysis shifted training systems to contractor performance. Depot gap analysis conducted in FY 2024-FY 2025; working with Item Managers to integrate common assets into existing depots in FY 2027 and activating hardware and software locations per DSOR. The FY 2026 spend plan amount for Aircraft Procurement includes 67,428 thousand of discretionary and 210,300 thousand of mandatory (reconciliation) for a total of 277,728 thousand. The FY 2026 spend plan mandatory (reconciliation) funding and will procure 6 MH-139As for a total of 8 in FY 2026. LI H0106O - MH-139A Air Force UNCLASSIFIED Page 1 of 10 P-1 Line #14 Volume 1 - 85 === page 122 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 04: Other Aircraft / BSA 1: Helicopters ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: H0106O / MH-139A Program Elements for Code B Items: 0102110F Other Related Program Elements: 0102110F Line Item MDAP/MAIS Code: 562 Exhibits Schedule Exhibit Type Title* P-5 MH-139A P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 B MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 20 / 553.190 8 / 279.095 2 / 67.428 4 / 252.949 - / - 4 / 252.949 20 / 553.190 8 / 279.095 2 / 67.428 4 / 252.949 - / - 4 / 252.949 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 will procure the full-rate production lot of four (4) aircraft with associated training, support equipment, site activation support, other government costs, program support costs, depot activation, interim supply support, and interim contractor support. LI H0106O - MH-139A Air Force UNCLASSIFIED Page 2 of 10 P-1 Line #14 Volume 1 - 86 === page 123 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: H0106O / MH-139A Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 1 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: MH-139A MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) FY 2025 FY 2026 4 - 4 553.190 279.095 67.428 252.949 - 252.949 - - 279.095 - Total Obligation Authority ($ in Millions) FY 2027 Total 2 553.190 Plus CY Advance Procurement ($ in Millions) FY 2027 OOC 8 - Net Procurement (P-1) ($ in Millions) FY 2027 Base 20 - 553.190 - 67.428 - 279.095 - 252.949 - 67.428 - - 252.949 - 252.949 - 252.949 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 31.567 34.393 4.888 0.973 - 0.973 Gross/Weapon System Unit Cost ($ in Millions) 27.660 34.887 33.714 63.237 - 63.237 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Flyaway - MH-139 Cost Recurring Cost Airframe/Contractor Furnished (†) Equipment 17.369 20 347.380 16.503 8 132.024 17.005 2 34.010 16.660 4 66.640 - - - 16.660 4 66.640 Other Flyaway Costs - - 31.680 - - 12.625 - - 23.010 - - 22.720 - - - - - 22.720 Subtotal: Recurring Cost - - 379.060 - - 144.649 - - 57.020 - - 89.360 - - - - - 89.360 Subtotal: Flyaway - MH-139 Cost - - 379.060 - - 144.649 - - 57.020 - - 89.360 - - - - - 89.360 Training - - 70.659 - - 24.490 - - - - - 5.080 - - - - - 5.080 Support Equipment - - 11.727 - - 12.004 - - 9.668 - - 38.900 - - - - - 38.900 Site Activation Support - - 0.445 - - 0.426 - - 0.740 - - 1.830 - - - - - 1.830 Other Government Costs - - 28.556 - - 13.778 - - - - - 5.020 - - - - - 5.020 Program Support Costs Contractor Services - - 23.452 - - 11.806 - - - - - 15.450 - - - - - 15.450 Depot Stand up Costs - - 1.791 - - 38.021 - - - - - 22.089 - - - - - 22.089 Interim Contractor Support - - 37.500 - - 33.921 - - - - - 75.220 - - - - - 75.220 Subtotal: Support - MH-139 Cost - - 174.130 - - 134.446 - - 10.408 - - 163.589 - - - - - 163.589 Gross/Weapon System Cost 27.660 20 553.190 34.887 279.095 33.714 67.428 63.237 252.949 - - - 63.237 Support - MH-139 Cost LI H0106O - MH-139A Air Force 8 2 UNCLASSIFIED Page 3 of 10 4 P-1 Line #14 4 252.949 Volume 1 - 87 === page 124 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 1 P-1 Line Item Number / Title: H0106O / MH-139A ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: MH-139A MDAP/MAIS Code: Remarks: Depot Source Of Repair (DSOR) decision received Sep 2022. The decision outlines Fleet Readiness Center East for Dynamic and Structural hardware components; Ogden ALC, Warner Robbins ALC, and Oklahoma City ALC for LRU hardware and software; Warner Robins ALC for software sustainment; and finally, JBSA-Lackland for cryptographic hardware work. Additionally, the sustainment business case analysis shifted training systems to contractor performance. Depot gap analysis conducted in FY 2024-FY 2025; working with Item Managers to integrate common assets into existing depots in FY 2027 and activating hardware and software locations per DSOR. (†) indicates the presence of a P-5a LI H0106O - MH-139A Air Force UNCLASSIFIED Page 4 of 10 P-1 Line #14 Volume 1 - 88 === page 125 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 1 Cost Elements Airframe/Contractor Furnished (†) Equipment Airframe/Contractor Furnished (†) Equipment Airframe/Contractor Furnished (†) Equipment Airframe/Contractor Furnished (†) Equipment Airframe/Contractor Furnished (†) Equipment Airframe/Contractor Furnished (†) Equipment (†) O O C P-1 Line Item Number / Title: H0106O / MH-139A Item Number / Title [DODIC]: MH-139A FY Contractor and Location Method/Type or Funding Vehicle Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) 2022 Boeing / Ridley Park, PA C / FFP AFLCMC/WI - ISR & SOF Mar 2023 Oct 2024 8 16.044 N Jan 2023 Jul 2017 2023 Boeing / Ridley Park, PA C / FFP AFLCMC/WI - ISR & SOF Mar 2023 May 2025 5 18.210 N Jan 2023 Jul 2017 2024 Boeing / Ridley Park, PA C / FFP AFLCMC/WI - ISR & SOF Mar 2024 Nov 2025 7 17.900 N Mar 2023 Jul 2017 2025 Boeing / Ridley Park, PA C / FFP AFLCMC/WI - ISR & SOF Sep 2025 Jul 2026 8 16.503 N Jan 2023 Jul 2017 2026 Boeing / Ridley Park, PA C / FFP AFLCMC/WI - ISR & SOF Jul 2026 Feb 2028 2 17.005 N Jan 2023 Jul 2017 2027 Boeing / Ridley Park, PA C / FFP AFLCMC/WI - ISR & SOF Mar 2027 Oct 2028 4 16.660 N Jan 2023 Jul 2017 Qty (Each) RFP Issue Date indicates the presence of a P-21 LI H0106O - MH-139A Air Force UNCLASSIFIED Page 5 of 10 P-1 Line #14 Volume 1 - 89 === page 126 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: H0106O / MH-139A Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: MH-139A Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Airframe/Contractor Furnished Equipment 1 2022 AF 8 0 8 A - - - - - - - - - - - - - - - - - - - 8 1 2023 AF 5 0 5 A - - - - - - - - - - - - - - - - - - - 5 1 2024 AF 7 0 7 A - - - - - - - 7 1 2025 AF 8 0 8 8 1 2026 AF 2 0 2 2 1 2027 AF 4 0 4 4 O C T LI H0106O - MH-139A Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #14 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 90 === page 127 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: H0106O / MH-139A Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: MH-139A Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Airframe/Contractor Furnished Equipment 1 2022 AF 8 0 8 1 2023 AF 5 0 5 - 1 - - - - - - 1 2024 AF 7 0 7 - - - - - - - 1 2025 AF 8 0 8 1 2026 AF 2 0 2 1 2027 AF 4 0 4 2 1 1 1 1 0 1 2 - - - 2 - 0 - - - A - - 2 1 - 1 - 1 - 1 - 1 - 0 - - - 1 1 A - 1 - - 5 2 4 O C T LI H0106O - MH-139A Air Force 1 N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #14 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 91 === page 128 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: H0106O / MH-139A Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: MH-139A Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Airframe/Contractor Furnished Equipment 1 2022 AF 8 8 0 0 1 2023 AF 5 5 0 0 1 2024 AF 7 7 0 1 2025 AF 8 3 5 1 2026 AF 2 0 2 1 2027 AF 4 0 4 0 1 O C T LI H0106O - MH-139A Air Force 1 - N O V 1 D E C 1 J A N 1 F E B 0 - - - - - - - - - - - A - - - - - - - - - - - M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 10 S E P O C T N O V D E C J A N 1 1 F E B P-1 Line #14 0 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 92 4 === page 129 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: H0106O / MH-139A Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: MH-139A Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Airframe/Contractor Furnished Equipment 1 2022 AF 8 8 0 0 1 2023 AF 5 5 0 0 1 2024 AF 7 7 0 0 1 2025 AF 8 8 0 0 1 2026 AF 2 2 0 1 2027 AF 4 0 4 0 1 O C T LI H0106O - MH-139A Air Force 1 N O V 2 D E C 0 J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 10 S E P O C T N O V D E C J A N F E B P-1 Line #14 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 93 === page 130 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: H0106O / MH-139A Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 1 Item Number / Title [DODIC]: MH-139A Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location MSR For 2027 1-8-5 For 2027 MAX For 2027 1 Boeing - Ridley Park, PA 2 16 16 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 6 19 Total After Oct 1 ALT Prior to Oct 1 25 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI H0106O - MH-139A Air Force UNCLASSIFIED Page 10 of 10 P-1 Line #14 Volume 1 - 94 0 === page 131 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 04: Other Aircraft / BSA 1: Helicopters ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: H060WH / Combat Rescue Helicopter Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 479 Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) 4 2 4,527.368 355.185 207.500 4,527.368 Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) FY 2026 85 Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) FY 2025 4,527.368 355.185 355.185 207.500 207.500 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - 91 69.395 - 69.395 0.000 0.000 0.000 0.000 - 5,159.448 Total - - - - - - - - 69.395 - 69.395 0.000 0.000 0.000 0.000 - - - - - - - - - - 69.395 - 69.395 0.000 0.000 0.000 0.000 - 5,159.448 100.523 5,159.448 - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 283.456 1.859 2.329 9.997 - 9.997 83.583 76.721 87.155 - 645.623 Flyaway Unit Cost ($ in Millions) 37.607 48.875 49.100 - - - - - - - - 38.354 Gross/Weapon System Unit Cost ($ in Millions) 53.263 88.796 103.750 - - - - - - - - 56.697 Description: The Combat Rescue Helicopter (HH-60W) program will replace the aging HH-60G in FY 2026. The primary mission of the HH-60W is to conduct day / night / marginal weather Combat Search and Rescue (CSAR) in order to recover downed aircrew or other isolated personnel in hostile or non-permissive environments. The HH-60W will be capable of employment day or night, in adverse weather, and across the full spectrum of threats to include chemical, biological, radiological, and nuclear. Onboard defensive capabilities will permit the HH-60W system to operate with less risk than legacy systems in an increased threat environment. An in-flight air refueling capability will provide an airborne alert capability and extend its combat mission range. The HH-60W system is capable of conducting combat search and rescue airborne mission commander duties. The aircraft will be self-supporting to the maximum extent practical. The HH-60W system may also conduct other collateral missions inherent in its capabilities to conduct Personnel Recovery, such as non-conventional assisted recovery, non-conventional evacuation operations, defense support to civil authorities, civil search and rescue, international aid, emergency aeromedical evacuation, disaster/humanitarian relief, counterdrug activities, support for National Aeronautics and Space Administration flight operations, and insertion/extraction of combat forces. The HH-60W program received approval to enter Engineering and Manufacturing Development (EMD) in June 2014. Subsequently, the Air Force awarded an EMD contract to Lockheed Martin - Sikorsky Aircraft Company to develop and procure up to 113 HH-60W aircraft, training systems and associated support. During production, the program plans to procure 89 aircraft throughout seven lots. HH-60W achieved a Milestone C decision in Sep 2019, authorizing Low-Rate Initial Production (LRIP) Lots 1-4, to procure 55 aircraft with FY 2019-FY 2022 funds. Full Rate Production (FRP) was achieved in Apr 2023 authorizing the purchase of 36 aircraft with FY 2023, FY 2024, FY 2025 and FY 2026 funds. Currently funding is available to procure 102 aircraft (includes four EMD, five system development test articles, and two modernization test aircraft). Initial aircraft sustainment efforts will be provided by the contractor. HH-60W funding also supports Training Systems, Support Equipment, Initial Spares, Operation Site Activation, Depot Stand-Up, Direct Mission Support, Program Support Costs (PSC) activities, Other Government Costs (OGC), various studies and analysis, upgrades, future HH-60W planning activities, and resolution of Diminishing Manufacturing Sources/Material Shortages (DMSMS) and/or obsolescence issues. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. DMSMS activities may include, but are not limited to, bridge buys, life of type buys, buys to protect production schedule, and engineering efforts for redesign. These funds may provide training, upgrades, enhancement packages, other program support costs, and resolution of Diminishing Manufacturing Sources/material Shortages (DMSMS) and/or obsolescence issues. DMSMS activities may include, but are not limited to, bridge buys, life of type buys, buys to protect production schedule, and engineering efforts for redesign. Programmed Depot Maintenance (PDM) Depot Source of Repair (DSOR) approved Dec 2022. System-level PDM will occur at Fleet Readiness Center-East, Cherry Point, NC. Commodity Depot Level Repairs will occur at the designated/approved DSOR location. The Deputy Assistant Secretary of War for Materiel Readiness and the Joint Services have concurred with this joint decision. LI H060WH - Combat Rescue Helicopter Air Force UNCLASSIFIED Page 1 of 13 P-1 Line #15 Volume 1 - 95 === page 132 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 04: Other Aircraft / BSA 1: Helicopters ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: H060WH / Combat Rescue Helicopter Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 479 The HH-60W program is acquiring a complete Training system to include motion and non-motion simulators, virtual reality/mixed reality trainers, and other aircrew and maintenance part task training devices. It also includes Type I training, aircrew and maintenance courseware, spares, Interim Contractor Support (ICS), and support equipment. Initial Spares were procured with Aircraft Procurement, Air Force (APAF) BA 4 funding in FY 2019, FY 2020, FY 2021, FY 2023 and FY 2024. Spare engines are included within the Initial Spares. Starting in FY 2021 Initial Spares are primarily being procured with APAF BA 6 while some BA 4 funding was required to fund initial spares for added OCO and congressional add aircraft. Procurement budget includes in-line production and enhancement packages/installs. These efforts may include, but are not limited to, the following: Infrared Counter Measure (IRCM) capability, a Degraded Visual Environment (DVE) system, Follow-on Capability Upgrade System (FOCUS) which includes Next Gen Crypto Mod Mobile User Objective System (MUOS) including Joint Range Extension Applications Protocol (JREAP) and Global Positioning System Anti-Jam/Anti-Spoof (GPS AJ), LINK 16, Personnel Locator System (PLS), Hybrid Satellite Communications (SATCOM), Joint Tactical Terminal (JTT), Air Force District of Washington (AFDW) mission requirement modifications and simulation trainer purchase, Electronic Flight Bags, and Automated Dependent Surveillance Broadcast-In Device. Capability Upgrades and modernization also support inclusion for mandates, hardware and software changes for diminishing manufacturing sources, spares, and component obsolescence issues for aircraft and training systems. Funding for this exhibit is contained in PE 0207229F. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. This requirement (or modification) supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. LI H060WH - Combat Rescue Helicopter Air Force UNCLASSIFIED Page 2 of 13 P-1 Line #15 Volume 1 - 96 === page 133 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 04: Other Aircraft / BSA 1: Helicopters ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: H060WH / Combat Rescue Helicopter Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: 479 Exhibits Schedule Exhibit Type Title* P-5 Combat Rescue Helicopter P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 85 / 4,527.368 4 / 355.185 2 / 207.500 - / 69.395 - / - - / 69.395 85 / 4,527.368 4 / 355.185 2 / 207.500 - / 69.395 - / - - / 69.395 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding will procure Interim Contractor Support (ICS) for training systems, program support costs, other government costs, depot standup activities, resolution of Diminishing Manufacturing Sources/ material Shortages (DMSMS) and/or obsolescence issues, including Windows 11 update mandate. Due to an inadvertent database error, the FY 2027 funding in P-1 Line #61 of $35.0 million, was intended for this line (P-1 Line P-15). This funding is intended to start AFDW Operational Flight Trainer procurement in FY 2027. LI H060WH - Combat Rescue Helicopter Air Force UNCLASSIFIED Page 3 of 13 P-1 Line #15 Volume 1 - 97 === page 134 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: H060WH / Combat Rescue Helicopter Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 1 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Combat Rescue Helicopter MDAP/MAIS Code: Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) FY 2025 FY 2026 85 4 2 4,527.368 355.185 207.500 Less PY Advance Procurement ($ in Millions) - Net Procurement (P-1) ($ in Millions) - 4,527.368 Plus CY Advance Procurement ($ in Millions) - - 69.395 - 69.395 207.500 - 4,527.368 FY 2027 OOC - - 355.185 - Total Obligation Authority ($ in Millions) FY 2027 Base - - - 69.395 - 69.395 - 355.185 207.500 FY 2027 Total - - - 69.395 - 69.395 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) 283.456 1.859 2.329 9.997 - 9.997 Gross/Weapon System Unit Cost ($ in Millions) 53.263 88.796 103.750 - - - Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Flyaway - HH-60W Cost Recurring Cost (†) 32.839 85 2,791.283 40.000 160.000 41.000 82.000 - - 0.000 - - - - - Other Flyaway Costs - - 405.276 - - 35.500 - - 16.200 - - - - - - - - - Subtotal: Recurring Cost - - 3,196.559 - - 195.500 - - 98.200 - - 0.000 - - - - - 0.000 Subtotal: Flyaway - HH-60W Cost - - 3,196.559 - - 195.500 - - 98.200 - - 0.000 - - - - - 0.000 Support Equipment - - 55.465 - - - - - - - - - - - - - - - Training - - 270.097 - - 38.467 - - 34.412 - - 56.450 - - - - - 56.450 Site Activation - - 120.919 - - 32.485 - - 12.623 - - - - - - - - - Initial Spares - - 418.220 - - - - - - - - - - - - - - - Initial Spares for OCO aircraft - - 30.127 - - - - - - - - - - - - - - - Program Support Costs (PSC) Contractor Services - - 70.606 - - 12.000 - - 5.000 - - 5.000 - - - - - 5.000 Program Support Costs (PSC) Other Government Costs - - 20.914 - - 3.000 - - - - - 0.500 - - - - - 0.500 Other Government Costs - - 256.558 - - 9.000 - - 10.912 - - 2.145 - - - - - 2.145 Depot Standup - - 6.210 - - 42.236 - - 40.413 - - 4.500 - - - - - 4.500 Modernization/Upgrades - - 0.748 - - - - - - - - - - - - - - - Obsolescence - - 80.945 - - 22.497 - - 5.940 - - 0.800 - - - - - 0.800 Airframe / CFE 4 2 0.000 Support - HH-60W Cost LI H060WH - Combat Rescue Helicopter Air Force UNCLASSIFIED Page 4 of 13 P-1 Line #15 Volume 1 - 98 === page 135 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: H060WH / Combat Rescue Helicopter Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 1 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: Combat Rescue Helicopter MDAP/MAIS Code: Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Subtotal: Support - HH-60W Cost Gross/Weapon System Cost Unit Cost ($ M) FY 2025 Total Cost Qty (Each) ($ M) Unit Cost ($ M) - - 1,330.809 - 53.263 85 4,527.368 88.796 FY 2026 Total Cost Qty (Each) ($ M) - 159.685 4 355.185 Unit Cost ($ M) 103.750 FY 2027 Base Total Cost Qty (Each) ($ M) 2 Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) 109.300 - - 69.395 - - - - - 69.395 207.500 - - 69.395 - - - - - 69.395 Remarks: FY 2027 costs may include sight activation, Interim Supply Support (ISS), ISS Repairs, Field Service Representatives and Technical Service Representatives through FY27. Other Government Costs includes defensive systems and product support. Program Support Costs for Contractor Services include the program's A&AS contract. Depot funding will be used for organic standup of Programmed Depot Maintenance (PDM) and Commodity activations. PDM Depot Source of Repair (DSOR) was approved Dec 2022. These costs are in alignment with prohibition on previous FY 2024 funding being used to terminate operations or prepare to terminate options of a production line for Air Force HH-60W Combat Rescue Helicopters. (†) indicates the presence of a P-5a LI H060WH - Combat Rescue Helicopter Air Force UNCLASSIFIED Page 5 of 13 P-1 Line #15 Volume 1 - 99 === page 136 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 1 Cost Elements (†) O O C P-1 Line Item Number / Title: H060WH / Combat Rescue Helicopter FY Contractor and Location Method/Type or Funding Vehicle Item Number / Title [DODIC]: Combat Rescue Helicopter Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Jun 2021 10 41.245 Y Mar 2012 Qty (Each) RFP Issue Date Airframe / CFE (†) 2019 Sikorsky Aircraft / Stratford, CT SS / FPIF AFLCMC/WI - ISR & SOF Sep 2019 (1) Airframe / CFE (†) 2020 Sikorsky Aircraft / Stratford, CT SS / FPIF AFLCMC/WI - ISR & SOF Feb 2020 Jul 2022 12 41.432 Y Mar 2012 Airframe / CFE (†) 2021 Sikorsky Aircraft / Stratford, CT SS / FPIF AFLCMC/WI - ISR & SOF Jul 2021 Oct 2023 19 37.348 Y Mar 2012 Airframe / CFE (†) 2022 Sikorsky Aircraft / Stratford, CT SS / FPIF AFLCMC/WI - ISR & SOF Feb 2022 Aug 2024 14 36.679 Y Mar 2012 Airframe / CFE (†) 2023 Sikorsky Aircraft / Stratford, CT SS / FPIF AFLCMC/WI - ISR & SOF Apr 2023 Aug 2025 20 31.024 Y Mar 2012 Airframe / CFE (†) 2024 Sikorsky Aircraft / Stratford, CT SS / FFP AFLCMC/WI - ISR & SOF Sep 2024 Jun 2026 10 37.500 Y Mar 2012 Airframe / CFE (†) 2025 Sikorsky Aircraft / Stratford, CT SS / FFP AFLCMC/WI - ISR & SOF Jun 2027 Aug 2029 4 40.000 Y Mar 2012 Airframe / CFE (†) 2026 Sikorsky Aircraft / Stratford, CT SS / FFP AFLCMC/WI - ISR & SOF Jun 2027 Dec 2029 2 41.000 Y Mar 2012 indicates the presence of a P-21 Footnotes: (1) All lots are contract options covered under the same contract (RFP 9 Mar 12, Award 26 Jun 14). Each lot is exercised individually. LI H060WH - Combat Rescue Helicopter Air Force UNCLASSIFIED Page 6 of 13 P-1 Line #15 Volume 1 - 100 === page 137 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: H060WH / Combat Rescue Helicopter Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Combat Rescue Helicopter Fiscal Year 2019 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2018 1 OCT Calendar Year 2019 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2020 M A Y J U N J U L Calendar Year 2020 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Airframe / CFE 1 2019 AF (2) 10 0 10 1 2020 AF (3) 12 0 12 1 2021 AF (4) 19 0 19 19 1 2022 AF (5) 14 0 14 14 1 2023 AF 20 0 20 20 1 2024 AF 10 0 10 10 1 2025 AF 4 0 4 4 1 2026 AF 2 0 2 A - - - - - - - - - - - - - 10 A - - - - - - - - 12 2 O C T LI H060WH - Combat Rescue Helicopter Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 7 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #15 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 101 === page 138 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: H060WH / Combat Rescue Helicopter Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Combat Rescue Helicopter Fiscal Year 2021 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2020 1 OCT Calendar Year 2021 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2022 M A Y J U N J U L Calendar Year 2022 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Airframe / CFE 1 2019 AF (2) 10 0 10 - - - - - - - - 10 1 2020 AF (3) 12 0 12 - - - - - - - - - 1 2021 AF (4) 19 0 19 1 2022 AF (5) 14 0 14 1 2023 AF 20 0 20 20 1 2024 AF 10 0 10 10 1 2025 AF 4 0 4 4 1 2026 AF 2 0 2 0 - - - - - - - - - - - - 12 A - - - - - - - - - - - - - - - 19 0 A - - - - - - - - 14 2 O C T LI H060WH - Combat Rescue Helicopter Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 8 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #15 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 102 === page 139 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: H060WH / Combat Rescue Helicopter Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Combat Rescue Helicopter Fiscal Year 2023 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2022 1 OCT Calendar Year 2023 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2024 M A Y J U N J U L Calendar Year 2024 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Airframe / CFE 1 2019 AF (2) 10 10 0 1 2020 AF (3) 12 12 0 1 2021 AF (4) 19 0 19 - - - - - - - - - - - - 19 1 2022 AF (5) 14 0 14 - - - - - - - - - - - - - - - - - - - - - - 1 2023 AF 20 0 20 A - - - - - - - - - - - - - - - - 1 2024 AF 10 0 10 1 2025 AF 4 0 4 1 2026 AF 2 0 2 0 0 0 2 - 12 - 20 A - 10 - 4 2 O C T LI H060WH - Combat Rescue Helicopter Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 9 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #15 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 103 === page 140 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: H060WH / Combat Rescue Helicopter Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Combat Rescue Helicopter Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Airframe / CFE 1 2019 AF (2) 10 10 0 0 1 2020 AF (3) 12 12 0 0 1 2021 AF (4) 19 19 0 1 2022 AF (5) 14 2 12 1 2023 AF 20 0 20 - - - - - - - - - - 1 2024 AF 10 0 10 - - - - - - - - - - 1 2025 AF 4 0 4 1 2026 AF 2 0 2 0 1 1 3 - 1 - 2 1 1 2 0 1 3 - 2 - 2 - 1 - 4 - 1 - 2 - 2 - 2 - 0 - 1 1 1 1 6 4 2 O C T LI H060WH - Combat Rescue Helicopter Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 10 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #15 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 104 === page 141 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: H060WH / Combat Rescue Helicopter Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Combat Rescue Helicopter Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P Airframe / CFE 1 2019 AF (2) 10 10 0 0 1 2020 AF (3) 12 12 0 0 1 2021 AF (4) 19 19 0 0 1 2022 AF (5) 14 14 0 0 1 2023 AF 20 20 0 1 2024 AF 10 4 6 1 2025 AF 4 0 4 A - - - - - - - - - - - - - - - - 4 1 2026 AF 2 0 2 A - - - - - - - - - - - - - - - - 2 0 1 O C T LI H060WH - Combat Rescue Helicopter Air Force 1 N O V 1 D E C 1 J A N 1 F E B 1 M A R 0 A P R M A Y J U N J U L A U G UNCLASSIFIED Page 11 of 13 S E P O C T N O V D E C J A N F E B P-1 Line #15 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 105 === page 142 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: H060WH / Combat Rescue Helicopter Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 1 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: Combat Rescue Helicopter Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E Airframe / CFE 1 2019 AF (2) 10 10 0 0 1 2020 AF (3) 12 12 0 0 1 2021 AF (4) 19 19 0 0 1 2022 AF (5) 14 14 0 0 1 2023 AF 20 20 0 0 1 2024 AF 10 10 0 1 2025 AF 4 0 4 - - - - - - - - - - 1 2026 AF 2 0 2 - - - - - - - - - - 0 O C T LI H060WH - Combat Rescue Helicopter Air Force N O V D E C J A N F E B M A R A P R M A Y J U N J U L 1 1 A U G UNCLASSIFIED Page 12 of 13 1 S E P 1 O C T 0 N O V 1 D E C 1 J A N 0 F E B P-1 Line #15 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 106 === page 143 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: H060WH / Combat Rescue Helicopter Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 1 Item Number / Title [DODIC]: Combat Rescue Helicopter Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Sikorsky Aircraft - Stratford, CT MSR For 2027 1-8-5 For 2027 MAX For 2027 10 10 20 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 21 30 Total After Oct 1 ALT Prior to Oct 1 51 ALT After Oct 1 0 Manufacturing PLT 0 Total After Oct 1 0 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). Footnotes: (2) (3) (4) (5) Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. Prior Year contracts with undelivered assets have all deliveries occurring before Oct 2024 loaded in the month of first delivery. LI H060WH - Combat Rescue Helicopter Air Force UNCLASSIFIED Page 13 of 13 P-1 Line #15 Volume 1 - 107 0 === page 144 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 108 === page 145 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 04: Other Aircraft / BSA 4: Mission Support Aircraft ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: C03700 / C-37A Program Elements for Code B Items: N/A Other Related Program Elements: 0401314F Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 Procurement Quantity (Units in Each) - - - Gross/Weapon System Cost ($ in Millions) - 0.000 0.000 Less PY Advance Procurement ($ in Millions) - - - Net Procurement (P-1) ($ in Millions) - 0.000 0.000 Plus CY Advance Procurement ($ in Millions) - - - Total Obligation Authority ($ in Millions) - 0.000 0.000 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 To FY 2031 Complete FY 2030 Total 1 - 1 3 4 4 5 - 17 208.000 - 208.000 340.000 548.000 548.000 548.000 - 2,192.000 208.000 208.000 - 208.000 208.000 340.000 340.000 548.000 548.000 548.000 548.000 548.000 548.000 - 2,192.000 - 2,192.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - Flyaway Unit Cost ($ in Millions) - - - 203.617 - - 203.617 - Gross/Weapon System Unit Cost ($ in Millions) - - - 208.000 - 208.000 - - - - - - - - - - 113.333 137.000 137.000 109.600 - 128.941 Description: The C-37C aircraft will recapitalize the C-37A/B fleet with a common mission design series (MDS) in support of the Executive Airlift small aircraft mission. The recapitalization will consist of a minimum of 17 aircraft. Sixteen aircraft to recapitalize the existing C-37A/B fleet and one additional aircraft will address training deficiencies. The Common Small EA Replacement Aircraft program is based on modifying a commercial derivative aircraft with very important person (VIP) interiors, a distinguished visitor (DV) compartment, integrated mission communication, and self-defense systems. To meet emerging national security threats and address capacity challenges, AMC requires a fleet of aircraft capable of carrying up to five crew and twenty personnel on non-stop trips up to 7,500 miles anywhere in the world. C-37 funding will also support Program Support Costs (PSC) activities, Advisory & Assistance Services (A&AS), Other Government Costs (OGC). Future years will include interim supply support for additional aircraft and support equipment. Funding for this exhibit contained in PE 0401314F. LI C03700 - C-37A Air Force UNCLASSIFIED Page 1 of 3 P-1 Line #16 Volume 1 - 109 === page 146 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: C03700 / C-37A Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 04: Other Aircraft / BSA 4: Mission Support Aircraft ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0401314F Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 C-37A P-40 Total Gross/Weapon System Cost Subexhibits ID CD A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 0.000 - / 0.000 1 / 208.000 - / - 1 / 208.000 - / - - / 0.000 - / 0.000 1 / 208.000 - / - 1 / 208.000 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: This program is a new start. FY27 funding will purchase one commercial aircraft, initial non-recurring engineering, and installation required to modify the chosen commercial aircraft to meet the aforementioned capacity, mission communication, and self-defense systems requirements. Funding will also support Program Support Costs (PSC) activities. Based on preliminary requirements development and the draft acquisition strategy, this FY 2027 funding of $208.0 million was inadvertently programmed in P-1 line #16. Currently known information indicates this funding should be RDT&E within PE 0401314F; no R-1 for this PE is in the FY 2027 PB request. This funding will procure one C-37 green aircraft, fund integration of mission communications systems, and development of self-defense systems. LI C03700 - C-37A Air Force UNCLASSIFIED Page 2 of 3 P-1 Line #16 Volume 1 - 110 === page 147 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: C03700 / C-37A Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 4 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: C-37A MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base Procurement Quantity (Units in Each) - - - Gross/Weapon System Cost ($ in Millions) - 0.000 0.000 Less PY Advance Procurement ($ in Millions) - - - Net Procurement (P-1) ($ in Millions) - 0.000 0.000 Plus CY Advance Procurement ($ in Millions) - - - Total Obligation Authority ($ in Millions) - 0.000 0.000 FY 2027 OOC FY 2027 Total 1 - 1 208.000 - 208.000 - - 208.000 - - - 208.000 - 208.000 - - 208.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - 208.000 - - 208.000 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Flyaway - C-37C Acquistion Cost Recurring Cost - - - - - - - - - 203.617 - - - Subtotal: Recurring Cost C-37C Aircraft - - - - - - - - - 203.617 - - 1 203.617 - - - 203.617 - - 1 203.617 203.617 Subtotal: Flyaway - C-37C Acquistion Cost - - - - - - - - - - - 203.617 - - - - - 203.617 PSC - Other Government Costs - - - - - - - - - 1.977 1 1.977 - - - 1.977 1 1.977 PSC - Contractor Services - - - - - - - - - 2.406 1 2.406 - - - 2.406 1 2.406 Subtotal: Support - C-37C Acquisition Cost - - - - - - - - - - 4.383 - - - - Gross/Weapon System Cost - - - - - 0.000 - - 0.000 208.000 - - - Support - C-37C Acquisition Cost LI C03700 - C-37A Air Force UNCLASSIFIED Page 3 of 3 208.000 1 P-1 Line #16 208.000 - 4.383 1 208.000 Volume 1 - 111 === page 148 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 112 === page 149 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 04: Other Aircraft / BSA 4: Mission Support Aircraft ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: C0400D / C-40 Fleet Expansion Program Elements for Code B Items: 0401314F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 Procurement Quantity (Units in Each) - - Gross/Weapon System Cost ($ in Millions) - 10.000 Less PY Advance Procurement ($ in Millions) - - Net Procurement (P-1) ($ in Millions) - 10.000 Plus CY Advance Procurement ($ in Millions) - - Total Obligation Authority ($ in Millions) - 10.000 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 1 0.000 - 0.000 0.000 0.000 0.000 0.000 - 260.000 1 250.000 250.000 250.000 To FY 2031 Complete - - - - - - - - 0.000 - 0.000 0.000 0.000 0.000 0.000 - - - - - - - - - 0.000 - 0.000 0.000 0.000 0.000 0.000 - Total 260.000 260.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - 194.000 - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - 250.000 - - - - - - - - 260.000 Description: This effort will procure one C-40C aircraft to increase the fleet size from seven C-40Cs to eight C-40Cs. Funding for this effort was included in the FY26 appropriations bill as a program increase for one additional C-40C. The C-40C is a commercial derivative Boeing 737-700 twin engine, turbo fan aircraft used to airlift DoW officials and United States government personnel worldwide. Funding will be used to purchase a Boeing 737-700 and integrate the standard military-specific modifications and senior leader communications systems already present on the C-40C fleet. The funding will also support product support cost activities, program support costs; including advisory and assistance services, and other government costs. FY2025 was rescinded $10.000 million and is not reflected in this budget documentation. Funding for this exhibit contained in PE 0401314F Justification: No FY 2027 funding requested. LI C0400D - C-40 Fleet Expansion Air Force UNCLASSIFIED Page 1 of 1 P-1 Line #17 Volume 1 - 113 === page 150 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 114 === page 151 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 04: Other Aircraft / BSA 4: Mission Support Aircraft ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: CAPAC0 / Civil Air Patrol A/C Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 15.000 17.800 3.219 - 3.219 3.285 3.346 3.407 3.474 - 49.531 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 15.000 17.800 3.219 - 3.219 3.285 3.346 3.407 3.474 - 49.531 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 15.000 17.800 3.219 - 3.219 3.285 3.346 3.407 3.474 - 49.531 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The Civil Air Patrol (CAP) is a Congressionally chartered non-profit corporation that serves as the Auxiliary of the Air Force. CAP uses federally provided resources to provide assistance requested by the DoW, federal, state or local government authorities and non-governmental organizations (NGOs) to perform emergency or non-emergency public purpose missions and activities. Pursuant to US Code (Title 10 & 36) the purpose of CAP Corporation is to encourage and aid citizens of the US in contributing their efforts, services, and resources in developing aviation and in maintaining air supremacy; and to encourage and develop, by example, the voluntary contribution of private citizens to the public welfare. CAP provides aviation education and training, as well as encourages and fosters civil aviation in local communities. CAP also provides an organization to assist in meeting local emergencies and assists the Dept. of the Air Force in non-combat program/missions. This program has no initial spares cost. The weapon system cost, flyaway unit cost, and weapon system unit cost do not apply. Funding for this exhibit contained in PE 0901223F. Justification: FY27 funding covers the procurement of fixed-wing single engine aircraft. CAP maintains a minimum fleet of 541 aircraft per SecAF report to SASC. These aircraft are equipped with satellite digital imaging systems, automatic direction finder, emergency locator transmitter, FM radio, camera port window, ground power unit, appropriate training material, and/or additional associated mission equipment for use on Civil Air Patrol aircraft (e.g., full-motion video sensors, communication equipment, or other imaging systems). The combination of aircraft make, model, or type (typically, but not limited to Cessna-172, Cessna-182, and Cessna-206, and glider aircraft) procured during execution are a continuing requirement, based on critical equipment needed to support evolving mission requirements, market availability, and budget changes due to mark-ups, or cost fluctuations. LI CAPAC0 - Civil Air Patrol A/C Air Force UNCLASSIFIED Page 1 of 2 P-1 Line #18 Volume 1 - 115 === page 152 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 04: Other Aircraft / BSA 4: Mission Support Aircraft ID Code (A=Service Ready, B=Not Service Ready): A P-1 Line Item Number / Title: CAPAC0 / Civil Air Patrol A/C Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A CAP's average aircraft fleet is 21+ years. The average maintenance cost is $16,400 per aircraft, estimating $8,900,000 annually. Aircraft go through routine maintenance schedules, and no depot builds. The current baseline only procures 4x aircraft per year. The requirement is 15x aircraft per year to maintain the aircraft fleet and receive cost efficiency (-10% bulk buy rate). The useful life of CAP aircraft is 36 years. AF central procurement processes are not applicable. CAP's procurement processes/standards are described in 2 CFR 200, Uniform Administrative Requirements, Cost Principles, and Audit Requirements for Federal Awards; and Department of War Grant & Agreement Regulations. LI CAPAC0 - Civil Air Patrol A/C Air Force UNCLASSIFIED Page 2 of 2 P-1 Line #18 Volume 1 - 116 === page 153 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 10TRGT / Target Drones Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 04: Other Aircraft / BSA 5: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - 14 20 10 - 10 11 11 11 11 - 88 Gross/Weapon System Cost ($ in Millions) - 37.581 34.224 31.912 - 31.912 33.219 33.799 34.529 35.202 - 240.466 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 37.581 34.224 31.912 - 31.912 33.219 33.799 34.529 35.202 - Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 37.581 34.224 31.912 - 31.912 33.219 33.799 34.529 35.202 - 240.466 2.013 240.466 - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.659 0.668 0.686 - 0.686 - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - 2.684 1.711 3.191 - 3.191 3.020 3.073 3.139 3.200 - 2.733 Description: Full-scale Aerial Targets (FSAT) and Subscale Aerial Targets (SSAT) assure warfighters' weapon systems will perform effectively against real-world enemy fighters and cruise missiles. Aerial targets provide adherence to Public Law Title 10, Section 4172 "Live Fire/Lethality" developmental/operational test requirements. Target drones are used to validate operational missile/weapon system effectiveness and fighter Operational Flight Program (OFP) updates. Targets are essential for development testing/operational testing for all air-to-air (e.g., AIM-260, AIM-120, AIM-9X, etc.) and surface-to-air missiles (e.g. PAC 3, FIM 92 Stinger), and for the F-35, F-22A, F-18, F-16, F-15, among other aircraft. The objective is to provide threat realistic targets for missile testing to enable the development of offensive counter-air systems (air-toair and surface-to-air) capable of defeating changing enemy airborne threats. This program provides funding for the procurement and/or sustainment of Air Force Subscale Aerial Targets (BQM-167A - AFSAT), Full-scale Aerial Targets (FSAT), Target Control System (TCS), scoring systems, to include applicable target/TCS subsystems and modernization of mission/support equipment through tech refresh. The TCS program ensures software interoperability among service ranges, the encryption of range/aircraft data links, and associated communication devices. Funds support procurement of hardware and software to support the fielding of modernized Target Control System to support the gaps identified by ACC to enable realistic emulation of 5th and 6th generation enemy threats. Funding also provides for capabilities to meet current and future threats. Funding may be utilized for analysis and presentation of evolving threat scenarios and target area environments related to emerging threats. Funds may be used to requalify production lines, or qualify new ones, as needed. Aerial targets and associated systems are required for congressionally mandated testing and Air Force developmental and operational testing. Air Force is the designated executive agent for full-scale aerial targets. The Navy is the lead service for subscale aerial targets. This requirement supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Funding may be used to address production Diminishing Manufacturing Sources and Material Shortages (DMSMS)/Obsolescence issues through studies, bridge buys, life of type buys, supplier/parts replacement and qualification activities to preserve future production capabilities and capacities. Funding for this exhibit contained in PE 0305116F. LI 10TRGT - Target Drones Air Force UNCLASSIFIED Page 1 of 9 P-1 Line #20 Volume 1 - 117 === page 154 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: 10TRGT / Target Drones Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 04: Other Aircraft / BSA 5: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 AFSAT P-40 Total Gross/Weapon System Cost Subexhibits ID CD P-5a, P-21 A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - 14 / 37.581 20 / 34.224 10 / 31.912 - / - 10 / 31.912 - / - 14 / 37.581 20 / 34.224 10 / 31.912 - / - 10 / 31.912 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: AFSAT: FY27 funding to be utilized to procure approximately 10 USAF production assets, support equipment, sustaining production, diminishing manufacturing, engineering support, and obsolescence. Note: The FY26 WSC total quantity reflects 20. The correct FY26 total quantity is 11. Actual FY2026 Unit cost is $2.961 million. Note: Procurement quantities can change based on negotiated options/pricing bands and available funding, in accordance with Title 10, U.S. Code Section 2308 BUY-TO-BUDGET ACQUISITION. LI 10TRGT - Target Drones Air Force UNCLASSIFIED Page 2 of 9 P-1 Line #20 Volume 1 - 118 === page 155 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: 10TRGT / Target Drones Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: AFSAT MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) - 14 20 10 - 10 Gross/Weapon System Cost ($ in Millions) - 37.581 34.224 31.912 - 31.912 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 37.581 34.224 31.912 - 31.912 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 37.581 34.224 31.912 - 31.912 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - 0.659 0.668 0.686 - 0.686 Gross/Weapon System Unit Cost ($ in Millions) - 2.684 1.711 3.191 - 3.191 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Flyaway - AFSAT Cost Recurring Cost BQM-167 Production - - - 2.333 14 32.665 1.629 20 32.579 2.781 10 27.808 - - - 2.781 10 27.808 Subtotal: Recurring Cost - - - - - 32.665 - - 32.579 - - 27.808 - - - - - 27.808 Subtotal: Flyaway - AFSAT Cost - - - - - 32.665 - - 32.579 - - 27.808 - - - - - 27.808 Production Support - - - - - 0.000 - - 0.680 - - 0.900 - - - - - 0.900 Government Support - - - - - 1.969 - - 0.832 - - 0.448 - - - - - 0.448 Subtotal: Recurring Cost - - - - - 1.969 - - 1.512 - - 1.348 - - - - - 1.348 Subtotal: Logistics - AFSAT Cost - - - - - 1.969 - - 1.512 - - 1.348 - - - - - 1.348 Program Support Costs (PSC) Contractor Services - - - - - 2.471 - - 0.046 - - 2.100 - - - - - 2.100 PSC Other Government Costs - - - - - 0.476 - - 0.087 - - 0.656 - - - - - 0.656 Subtotal: Support - AFSAT Cost - - - - - 2.947 - - 0.133 - - 2.756 - - - - - 2.756 Gross/Weapon System Cost - - - 2.684 14 37.581 1.711 20 34.224 3.191 10 31.912 - - - 3.191 10 31.912 (†) Article Logistics - AFSAT Cost Recurring Cost Support - AFSAT Cost LI 10TRGT - Target Drones Air Force UNCLASSIFIED Page 3 of 9 P-1 Line #20 Volume 1 - 119 === page 156 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 5 P-1 Line Item Number / Title: 10TRGT / Target Drones ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: AFSAT MDAP/MAIS Code: Remarks: "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). (†) indicates the presence of a P-5a LI 10TRGT - Target Drones Air Force UNCLASSIFIED Page 4 of 9 P-1 Line #20 Volume 1 - 120 === page 157 === UNCLASSIFIED Date: April 2026 Exhibit P-5a, Procurement History and Planning: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 5 O O C Cost Elements (†) BQM-167 Production Article (†) BQM-167 Production Article (†) BQM-167 Production Article (†) P-1 Line Item Number / Title: 10TRGT / Target Drones Method/Type or Funding Vehicle Item Number / Title [DODIC]: AFSAT Location of PCO Award Date Date of First Delivery Specs Date Unit Cost Avail Revision Now? Available ($ M) Qty RFP Issue Date FY Contractor and Location 2025 Kratos, Unmanned Aerial Systems (UAS) / Sacramento, CA SS / FFP Eglin AFB Feb 2025 Apr 2027 14 2.333 Y Mar 2020 2026 Kratos, Unmanned Aerial Systems (UAS) / Sacramento, CA SS / FFP Eglin AFB Aug 2026 Apr 2028 20 1.629 Y Feb 2025 2027 Kratos, Unmanned Aerial Systems (UAS) / Sacramento, CA SS / FFP Eglin AFB Feb 2027 Apr 2029 10 2.781 Y Feb 2025 (Each) indicates the presence of a P-21 LI 10TRGT - Target Drones Air Force UNCLASSIFIED Page 5 of 9 P-1 Line #20 Volume 1 - 121 === page 158 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 10TRGT / Target Drones Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: AFSAT Fiscal Year 2025 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2024 1 OCT Calendar Year 2025 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2026 M A Y J U N J U L Calendar Year 2026 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P BQM-167 Production Article 1 2025 AF 14 0 14 1 2026 AF 20 0 20 1 2027 AF 10 0 10 A - - - - - - - - - - - - - - - - - - - 14 A - - 20 10 O C T LI 10TRGT - Target Drones Air Force - N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G UNCLASSIFIED Page 6 of 9 S E P O C T N O V D E C J A N F E B P-1 Line #20 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 122 === page 159 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 10TRGT / Target Drones Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: AFSAT Fiscal Year 2027 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2026 1 OCT Calendar Year 2027 O C T N O V D E C J A N F E B M A R A P R B A L A N C E Fiscal Year 2028 M A Y J U N J U L Calendar Year 2028 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P BQM-167 Production Article 1 2025 AF 14 0 14 - - - - - - 1 2026 AF 20 0 20 - - - - - - 1 2027 AF 10 0 10 A O C T LI 10TRGT - Target Drones Air Force N O V D E C J A N F E B 4 - M A R A P R - - - - M A Y 4 - J U N J U L - - - - A U G UNCLASSIFIED Page 7 of 9 3 - S E P O C T - - - - N O V 3 D E C 0 - - J A N - F E B P-1 Line #20 5 M A R - A P R - M A Y 5 J U N - J U L A U G - 10 - 10 S E P Volume 1 - 123 === page 160 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 10TRGT / Target Drones Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 5 Cost Elements (Units in Each) O O C M F R # FY SERVICE PROC QTY Item Number / Title [DODIC]: AFSAT Fiscal Year 2029 ACCEPT PRIOR BAL TO 1 DUE OCT AS OF 2028 1 OCT Fiscal Year 2030 Calendar Year 2029 O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L Calendar Year 2030 A U G S E P O C T N O V D E C J A N F E B M A R A P R M A Y J U N J U L A U G S E P B A L A N C E BQM-167 Production Article 1 2025 AF 14 14 0 1 2026 AF 20 10 10 1 2027 AF 10 0 10 0 5 O C T LI 10TRGT - Target Drones Air Force N O V - - - D E C 5 0 J A N F E B M A R 3 A P R M A Y J U N 3 J U L A U G UNCLASSIFIED Page 8 of 9 S E P 2 O C T N O V D E C 2 J A N 0 F E B P-1 Line #20 M A R A P R M A Y J U N J U L A U G S E P Volume 1 - 124 === page 161 === UNCLASSIFIED Date: April 2026 Exhibit P-21, Production Schedule: PB 2027 Air Force P-1 Line Item Number / Title: 10TRGT / Target Drones Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 5 Item Number / Title [DODIC]: AFSAT Production Rates (Each / Year) MFR Ref # Procurement Leadtime (Months) Initial Manufacturer Name - Location 1 Kratos, Unmanned Aerial Systems (UAS) Sacramento, CA MSR For 2027 1-8-5 For 2027 MAX For 2027 10 10 30 ALT Prior to Oct 1 ALT After Oct 1 0 Reorder Manufacturing PLT 0 0 Total After Oct 1 ALT Prior to Oct 1 0 10 ALT After Oct 1 Manufacturing PLT 5 Total After Oct 1 26 31 "A" in the Delivery Schedule indicates the Contract Award Date. Note: Due to space limitations, quantities in the Exhibit P-21 delivery calendar are truncated and rounded based on the maximum quantity in the calendar as follows. If the maximum quantity is less than or equal to than 9,999, all quantities are shown as each. If the maximum quantity is between 10,000 and 999,999 all quantities are shown in thousands. If the maximum quantity is between 1,000,000 and 999,999,999 all quantities are shown in millions (rounded to the nearest thousand).If the maximum quantity is equal or greater than 1,000,000,000 all quantities are shown in billions (rounded to the nearest million). LI 10TRGT - Target Drones Air Force UNCLASSIFIED Page 9 of 9 P-1 Line #20 Volume 1 - 125 === page 162 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 126 === page 163 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: CALL00 / Compass Call Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 04: Other Aircraft / BSA 5: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0207253F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 Procurement Quantity (Units in Each) - - Gross/Weapon System Cost ($ in Millions) - 0.000 Less PY Advance Procurement ($ in Millions) - - Net Procurement (P-1) ($ in Millions) - 0.000 Plus CY Advance Procurement ($ in Millions) - - Total Obligation Authority ($ in Millions) - 0.000 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 To FY 2031 Complete FY 2030 Total 2 3 - 3 2 2 2 1 - 12 400.000 660.000 - 660.000 440.000 440.000 620.000 334.000 - 2,894.000 400.000 400.000 660.000 660.000 - 660.000 660.000 440.000 440.000 440.000 440.000 620.000 620.000 334.000 334.000 - 2,894.000 - 2,894.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - 200.000 220.000 - 220.000 220.000 220.000 310.000 334.000 - 241.167 Description: Compass Call is the Air Force's wide-area, standoff, Airborne Electromagnetic Attack (AEA) Command and Control Warfare/Information Operations (C2W/IO) weapon system. The employment of this weapon system interrupts the adversary's use of the electromagnetic battlespace and is a key active component in the information battlespace and prosecution of current ground and airborne threats. Compass Call's sophisticated electromagnetic attack system is capable of surgical denial and/or disruption of adversary Radio Frequency (RF) communications, radar and sensor systems. Procurement funds are required for aircraft purchase, modification kit production (hardware, firmware, and software), installation, integration engineering, certification and test on an EA-37B re-host platform in accordance with the spiral baseline upgrade schedule. In FY2017, the Compass Call re-host program was initiated prompting transition of mission capabilities from the legacy EC-130H airframe to an EA-37B airframe. The re-hosted Compass Call platform is based on a commercial derivative G550 aircraft holding Federal Aviation Administration (FAA) Supplemental Type Certificates (STCs) for airworthiness. The platform will undergo modifications to host Compass Call's Prime Mission Equipment (PME) and antenna arrays and will receive additional STCs and Military Type Certificates (MTCs). The EA-37B aircraft will re-use PME from the EC-130H aircraft that will be upgraded to the latest Baseline configuration. Due to the age of the EC-130H fleet, re-hosting of the PME is crucial to ensuring the longevity of this critical capability. In an effort to put capability into the warfighter's hands as soon as possible, the EA-37B program pursues concurrent developmental and production activities. Transitioning to the re-host effort, the program of record has procured twelve (12) commercial derivative G550 aircraft to date. The first five (5) EA-37B aircraft, procured in FY2017-FY2020, will be delivered in the Baseline 3 (BL3) configuration. The remaining EA-37B aircraft, procured in FY2021, FY2023, and FY2026 will be delivered in the Baseline 4 (BL4) configuration. The strategy for modifying aircraft with future spiral baseline upgrades will optimize delivery of warfighter capability required to meet Combatant Command needs. The current Compass Call EA-37B program of record includes the following: twelve (12) EA-37B aircraft, two (2) Compass Call Mission Crew Simulators (CCMCS), and one (1) EA-37B Weapon System Trainer (WST). Due to the rapidly changing threat environment and operational demand leveraging Compass Call capabilities, the acquisition program manager may redirect funding as necessary to meet current stated and emerging/evolving Combatant Commander requirements. The purpose of this effort is to procure 3 EA-37B BL4 aircraft. The re-hosted Compass Call platform is based on a commercially-available modified G550 aircraft that already holds Federal Aviation Administration (FAA) Supplemental Type Certificates (STCs) for airworthiness. The platform will undergo modifications to host Compass Call's PME and antenna arrays and receive additional STCs and Military Type Certificates (MTCs). The EA-37B aircraft utilize PME upgraded to the latest Baseline. The EA-37B program is highly concurrent with developmental and procurement activities occurring in parallel. LI CALL00 - Compass Call Air Force UNCLASSIFIED Page 1 of 4 P-1 Line #21 Volume 1 - 127 === page 164 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 04: Other Aircraft / BSA 5: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: CALL00 / Compass Call Program Elements for Code B Items: 0207253F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Modification efforts for the re-hosted aircraft are performed under the Aircraft Procurement, Air Force appropriation, Budget Activity (BA) 05, Budget Sub Activity 5, under P-1 Line Item Number: CALL00/ COMPASS CALL Mods. Procurement of the air vehicles for re-host were performed under this line item Aircraft Procurement, Air Force appropriation, BA 04, Budget Sub Activity 05 under P-1 Line Item Number: CALL00/COMPASS CALL. Funding for this exhibit contained in PE 0207253F. LI CALL00 - Compass Call Air Force UNCLASSIFIED Page 2 of 4 P-1 Line #21 Volume 1 - 128 === page 165 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: CALL00 / Compass Call Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 04: Other Aircraft / BSA 5: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0207253F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 Compass Call P-40 Total Gross/Weapon System Cost Subexhibits ID CD B MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 0.000 2 / 400.000 3 / 660.000 - / - 3 / 660.000 - / - - / 0.000 2 / 400.000 3 / 660.000 - / - 3 / 660.000 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Procurement of the 3 x EA-37Bs raises the Air Force Program of Record to 15. FY27 funding will procure 3 used G550 aircrafts, the Gulfstream COMPASS CALL Cross-Deck modification, and most current Compass Call Operating System updates for Baseline 4. Procurement of the air vehicles for re-host were performed under this line item Aircraft Procurement, Air Force appropriation, BA 04, Budget Sub Activity 05 under P-1 Line Item Number: CALL00/COMPASS CALL. Modification efforts for the re-hosted aircraft are performed under the Aircraft Procurement, Air Force appropriation, Budget Activity (BA) 05, Budget Sub Activity 5, under P-1 Line Item Number: CALL00/ COMPASS CALL Mods. COST / SCHEDULE: 660M (FY27 3010BP10) is required to procure 3 EA-37Bs. Procurement of 3 x EA-37B scheduled to begin Q3FY27, with deliveries in FY32-33. Funding for this exhibit contained in PE 0207253F. LI CALL00 - Compass Call Air Force UNCLASSIFIED Page 3 of 4 P-1 Line #21 Volume 1 - 129 === page 166 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: CALL00 / Compass Call Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : B Item Number / Title [DODIC]: Compass Call MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 Procurement Quantity (Units in Each) - - Gross/Weapon System Cost ($ in Millions) - 0.000 Less PY Advance Procurement ($ in Millions) - - Net Procurement (P-1) ($ in Millions) - 0.000 Plus CY Advance Procurement ($ in Millions) - - Total Obligation Authority ($ in Millions) - 0.000 FY 2027 Base FY 2027 OOC FY 2027 Total 2 3 - 3 400.000 660.000 - 660.000 - - 400.000 - 660.000 - - 400.000 - - 660.000 - 660.000 - - 660.000 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - Gross/Weapon System Unit Cost ($ in Millions) - - - - 200.000 - 220.000 - - 220.000 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Hardware - Compass Call Cost Non Recurring Cost CAEW Modification - - - - - 0.000 Subtotal: Non Recurring Cost - - - - - 0.000 - - 312.000 - - - - - - 0.000 - - 312.000 - Aircraft Purchase - - - - - 0.000 44.000 88.000 49.000 Subtotal: Non Recurring Cost - - - - - 0.000 - - 88.000 - - Subtotal: Vehicles Compass Call Cost - - - - - 0.000 - - 88.000 - - Gross/Weapon System Cost - - - - - 0.000 Subtotal: Hardware Compass Call Cost 156.000 2 312.000 171.000 3 513.000 - - - 171.000 3 513.000 - 513.000 - - - - - 513.000 - 513.000 - - - - - 513.000 147.000 - - - 49.000 147.000 - - - - - 147.000 147.000 - - - - - 147.000 660.000 - - - Vehicles - Compass Call Cost Non Recurring Cost LI CALL00 - Compass Call Air Force 200.000 2 2 400.000 UNCLASSIFIED Page 4 of 4 220.000 3 3 P-1 Line #21 220.000 3 3 147.000 660.000 Volume 1 - 130 === page 167 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: E00700 / E-7 Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 04: Other Aircraft / BSA 5: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready): B Program Elements for Code B Items: 0604007F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - 16.931 46.267 47.169 - 310.367 Total Procurement Quantity (Units in Each) - - Gross/Weapon System Cost ($ in Millions) - 0.000 200.000 0.000 - 0.000 0.000 - Less PY Advance Procurement ($ in Millions) - 0.000 200.000 0.000 - 0.000 0.000 0.000 0.000 0.000 - 200.000 Net Procurement (P-1) ($ in Millions) - 0.000 0.000 0.000 - 0.000 0.000 16.931 46.267 47.169 - 110.367 Plus CY Advance Procurement ($ in Millions) - 200.000 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 - 200.000 Total Obligation Authority ($ in Millions) - 200.000 0.000 0.000 - 0.000 0.000 16.931 46.267 47.169 - 310.367 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The E-7 program is intended to replace the unsustainable E-3 Airborne Warning and Control System (AWACS). The E-3 AWACS, first fielded in the 1970s, is at the end of its service life, and costly to maintain. The E-7 will serve as the USAF's principal airborne platform for airborne command and control and airborne moving target indicator, providing a reliable, persistent critical node in the long range kill chain for the Joint Force Air Component Commander (JFACC). The E-7 is intended to provide increased capabilities to the USAF and the Joint Services to include the ability to detect and track highly maneuverable, small radar cross-section airborne targets (modern and emerging threats), the ability to real-time process and create a precise air picture, and the ability to battle manage (e.g. command and control) under a wide range of operational conditions. The E-7A is a highly modified Airborne Battle Management and Command and Control aircraft integrating a Boeing 737-700 Next Generation (737NG) airframe with a reinforced Section 46, a Northrop Grumman Multi-Role Electronically Scanned Array (MESA) Radar mounted on the aircraft's Section 46, and two 180-kVA generators added to commercial CFM-56 engines mounted beneath each wing. The E-7 will provide a reliable, operationally available, maintainable, and sustainable capability. Funding for this exhibit contained in PE 0604007F. This requirement supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues, Life-of-type part buys, management, and non-recurring redesign engineering. Justification: The FY26CR 119-4 Sec 129 transferred and merged with amounts available for the E-7 program under FY26 RDT&E only for the purpose of rapid prototyping activities to maintain program schedule and transition to production for the E-7 Wedgetail. PB26 proposed cancelling the E-7 program. PB27 does not include funding for E-7 procurement. LI E00700 - E-7 Air Force UNCLASSIFIED Page 1 of 2 P-1 Line #22 Volume 1 - 131 === page 168 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 04: Other Aircraft / BSA 5: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready): B P-1 Line Item Number / Title: E00700 / E-7 Program Elements for Code B Items: 0604007F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Funding for this exhibit contained in PE 0604007F LI E00700 - E-7 Air Force UNCLASSIFIED Page 2 of 2 P-1 Line #22 Volume 1 - 132 === page 169 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Advance Procurement Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 04: Other Aircraft / BSA 5: Other Aircraft P-1 Line Item Number / Title: E00700 / E-7 Program Elements for Code B Items: 0604007F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Gross/Weapon System Cost ($ in Millions) - 200.000 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 - 200.000 Net Procurement (P-1) ($ in Millions) - 200.000 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 - 200.000 Total Obligation Authority ($ in Millions) - 200.000 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 - 200.000 Description: The E-7 program is intended to replace the unsustainable E-3 Airborne Warning and Control System (AWACS). The E-3 AWACS, first fielded in the 1970s, is at the end of its service life, and costly to maintain. The E-7 will serve as the USAF's principal airborne platform for airborne command and control and airborne moving target indicator, providing a reliable, persistent critical node in the long range kill chain for the Joint Force Air Component Commander (JFACC). The E-7 is intended to provide increased capabilities to the USAF and the Joint Services to include the ability to detect and track highly maneuverable, small radar cross-section airborne targets (modern and emerging threats), the ability to real-time process and create a precise air picture, and the ability to battle manage (e.g. command and control) under a wide range of operational conditions. The E-7A is a highly modified Airborne Battle Management and Command and Control aircraft integrating a Boeing 737-700 Next Generation (737NG) airframe with a reinforced Section 46, a Northrop Grumman Multi-Role Electronically Scanned Array (MESA) Radar mounted on the aircraft's Section 46, and two 180-kVA generators added to commercial CFM-56 engines mounted beneath each wing. The E-7 would have provided a reliable, operationally available, maintainable, and sustainable capability. Funding for this exhibit contained in PE 0604007F. This requirement supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues, Life-of-type part buys, management, and non-recurring redesign engineering. Justification: The FY26 CR 119-4 Sec 129 transferred and merged with amounts available for the E-7 program under FY2026 RDT&E only for the purpose of rapid prototyping activities to maintain program schedule and transition to production for the E-7 Wedgetail. PB26 proposed cancelling the E-7 program. PB27 does not include funding for E-7 procurement. Funding for this exhibit contained in PE 0604007F. LI E00700 - E-7 Air Force UNCLASSIFIED Page 1 of 1 P-1 Line #23 Volume 1 - 133 === page 170 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 134 === page 171 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Q020BR / RQ-20B Puma Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 04: Other Aircraft / BSA 5: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 To FY 2031 Complete FY 2030 Procurement Quantity (Units in Each) - 6 6 6 - 6 6 6 6 Gross/Weapon System Cost ($ in Millions) - 11.283 11.437 15.513 - 15.513 11.999 12.221 12.451 Less PY Advance Procurement ($ in Millions) - - - - - - - - Net Procurement (P-1) ($ in Millions) - 11.283 11.437 15.513 - 15.513 11.999 12.221 Plus CY Advance Procurement ($ in Millions) - - - - - - - - Total Obligation Authority ($ in Millions) - 11.283 11.437 15.513 - 15.513 11.999 12.221 Total - - 36 12.694 - 87.598 - - - - 12.451 12.694 - 87.598 - - - - 12.451 12.694 - 87.598 - (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - 1.880 1.906 2.586 - 2.586 - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - 1.881 1.906 2.586 - 2.586 2.000 2.037 2.075 - - 2.433 Description: The RQ-20B is a small un-manned Aircraft System (UAS). It gives situational awareness by providing persistent, intelligence, surveillance, reconnaissance and targeting data (ISRT) to convoy and ground troops. The RQ-20B has a 9.2 foot wing span, 4.6 foot nose to tail length, a weight 14.6 kg, and is fully waterproof for all environment operations. It is capable of landing in water or on land. It has precision navigation with secondary Global Positioning System (GPS). The RQ-20B is equipped with both an electro-optical (EO) and an infrared (IR) camera. It also has an illuminator-Geo-location, laser marker. Funding for this exhibit contained in PE 0207588F. LI Q020BR - RQ-20B Puma Air Force UNCLASSIFIED Page 1 of 3 P-1 Line #24 Volume 1 - 135 === page 172 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Q020BR / RQ-20B Puma Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 04: Other Aircraft / BSA 5: Other Aircraft ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-5 RQ-20B Puma P-40 Total Gross/Weapon System Cost Subexhibits ID CD A MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - 6 / 11.283 6 / 11.437 6 / 15.513 - / - 6 / 15.513 - / - 6 / 11.283 6 / 11.437 6 / 15.513 - / - 6 / 15.513 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: PE0207588F Air Base Ground Defense [ABGD]. FY27 funding will enhance air base ground defense capabilities through the procurement of six (6) small un-manned Aircraft Systems for ISRT missions supporting convoy and ground troops. LI Q020BR - RQ-20B Puma Air Force UNCLASSIFIED Page 2 of 3 P-1 Line #24 Volume 1 - 136 === page 173 === UNCLASSIFIED Date: April 2026 Exhibit P-5, Cost Analysis: PB 2027 Air Force P-1 Line Item Number / Title: Q020BR / RQ-20B Puma Appropriation / Budget Activity / Budget Sub Activity: 3010F / 04 / 5 ID Code (A=Service Ready, B=Not Service Ready) : A Item Number / Title [DODIC]: RQ-20B Puma MDAP/MAIS Code: Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Procurement Quantity (Units in Each) - 6 6 6 - 6 Gross/Weapon System Cost ($ in Millions) - 11.283 11.437 15.513 - 15.513 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 11.283 11.437 15.513 - 15.513 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 11.283 11.437 15.513 - 15.513 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - 1.881 1.906 2.586 - 2.586 Note: Subtotals or Totals in this Exhibit P-5 may not be exact or sum exactly due to rounding. Prior Years Cost Elements Unit Cost ($ M) FY 2025 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Total Total Cost Qty (Each) Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Flyaway - RQ-20B Puma Cost Recurring Cost - - - 0.868 13 11.283 1.906 11.437 2.586 15.513 - - - 2.586 Subtotal: Recurring Cost RQ-20B Puma - - - - - 11.283 - - 11.437 - - 15.513 - - - - - 15.513 Subtotal: Flyaway - RQ-20B Puma Cost - - - - - 11.283 - - 11.437 - - 15.513 - - - - - 15.513 Gross/Weapon System Cost - - - 1.881 11.283 1.906 11.437 2.586 15.513 - - - 2.586 LI Q020BR - RQ-20B Puma Air Force 6 6 6 UNCLASSIFIED Page 3 of 3 6 6 P-1 Line #24 6 6 15.513 15.513 Volume 1 - 137 === page 174 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 138 === page 175 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 06: Aircraft Spares and Repair Parts / BSA 10: Aircraft Spares and Repair Parts P-1 Line Item Number / Title: 000999 / Initial Spares/Repair Parts Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 0.000 0.000 0.000 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 982.491 1,193.535 982.491 1,193.535 982.491 1,193.535 1,441.052 1,441.052 1,441.052 - 1,441.052 - 1,441.052 - 1,441.052 2,344.419 2,344.419 2,344.419 2,421.611 2,421.611 2,421.611 2,221.321 2,221.321 2,221.321 To FY 2031 Complete 1,945.193 1,945.193 1,945.193 Total 0.000 12,549.622 0.000 12,549.622 0.000 12,549.622 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Initial Spares/Repair Parts are required to fill the initial spares pipeline or repair parts inventory for all new aircraft systems, including modifications, support equipment, and other production categories. Initial spares/repair parts include peculiar repairable and consumable components, assemblies, and sub-assemblies that must be available for issue at all levels of supply in time to support newly fielded end items. The FY 2027 request for Initial Spares includes 1,441,052 thousand of discretionary and 1,132,293 thousand of mandatory (reconciliation) for a total of 2,573,345 thousand. The FY 2027 funds are different from the FY 2026 mandatory funds the provided initial spares for F-16 squadrons, F-35 squadrons, Collaborative Combat Aircraft and Electromagnetic Warfare Aircraft. The FY 2027 mandatory provides initial spares for F-35 squadrons. The FY 2026 spend plan amount for Aircraft Procurement Initial Spares includes 1,193,535 thousand of discretionary and 1,030,740 thousand of mandatory (reconciliation) for a total of 2,224,275 thousand. Initial spares are funded in the two program categories: 1) Working Capital Fund (WCF) Spares category includes but are not limited to Readiness Spares Packages, New Acquisition Spares, Modification Spares, Support Equipment, Other Production, and Consumables. When the spares are delivered this central procurement account will reimburse the WCF. Since FY 1994, some programs have used obligation authority in the WCF to procure initial spares. 2) Exempt Spares program category includes but not limited to Whole Spare Engines, Whole Spare Quick Engine Change Kits, Contractor Logistics Support, Simulators/Trainers, New Acquisition Spares, Modification Spares, Support Equipment, Classified Equipment, and Munitions. Exempt Spares are not purchased through the WCF. The budget authority is a direct cite on the contract. The following Major Defense Acquisition Programs (MDAP) have funding in the Initial Spares/Repair Parts line: B-2 Squadrons, 431 Combat Rescue Helicopter (CRH) / HH-60W, 479 CV-22, 212 Airborne Warning and Control System (AWACS) UPGRADE, 277 F-15 Eagle Passive/Active Warning and Survivability System (EPAWSS), 485 LI 000999 - Initial Spares/Repair Parts Air Force UNCLASSIFIED Page 1 of 7 P-1 Line #68 Volume 1 - 139 === page 176 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 06: Aircraft Spares and Repair Parts / BSA 10: Aircraft Spares and Repair Parts ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 000999 / Initial Spares/Repair Parts Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A F-35, 198 KC-46A Tanker Squadron, 387 MQ-9 UAS Reaper, 424 Advanced Pilot Training (APT) T-7A, 436 MH-139A, 562 VC-25B, 425 Funding for this exhibit is contained in PEs 0101113F, 0101127F, 0102110F, 0205219F, 0207133F, 0207134F, 0207138F, 0207142F, 0207146F, 0207171F, 0207229F, 0207238F, 0207249F, 0207253F, 0207417F, 0208015F, 0302015F, 0305116F, 0305206F, 0305207F, 0401115F, 0401119F, 0401130F, 0401218F, 0401221F, 0401318F, 0401319F, 0804701F and 0804741F. LI 000999 - Initial Spares/Repair Parts Air Force UNCLASSIFIED Page 2 of 7 P-1 Line #68 Volume 1 - 140 === page 177 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 06: Aircraft Spares and Repair Parts / BSA 10: Aircraft Spares and Repair Parts P-1 Line Item Number / Title: 000999 / Initial Spares/Repair Parts Program Elements for Code B Items: N/A ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-18 Initial Spares/Repair Parts P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) 431 479 212 277 485 265 198 387 424 436 562 - / - - / 982.491 - / 1,193.535 - / 1,441.052 / 0.000 - / 982.491 - / 1,193.535 - / 1,441.052 - / 0.000 - / 1,441.052 / - - / 1,441.052 Title represents the P-18 Title for Spares. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: This program, OTHACF Automated Test Systems, is a new start. This program, B01B00 B-1B Squadrons, is a new start. This program, H060WM HH60W Modifications, is a new start. This program, OSAEA0 VC-25B, is a new start. Aerial Targets: FY 2027 funding request is to procure spare parts for the Air Force Subscale Aerial Target (BQM-167A) to include initial replacement components, equipment and parts. Precision Attack Systems Procurement: FY 2027 funding request for procurement of initial spares to support and maintain Advanced Targeting Pods modified with enhanced combat identification, longer range target location, improved imagery processing and target identification. Efforts will reduce collateral damage, and increase fratricide prevention for F-15E, F-16, A-10, B-1B, and B-52. Spares will include major sub-components such as mid-wave and long wave infrared cameras, mission processors and controllers, and redesigned data links for encryption, as well as eye-safe lasers for use in urban environments. B-1B Squadrons - This is an FY27 New Start - initial readiness spares are required to support the fielding multiple new B-1 capabilities in the FYDP. FY 2027 funding request will buy initial spares for B-1 Hybrid Satellite Communications (SATCOM). B-2 Squadrons: FY 2027 funding will buy initial spares for B-2 communication programs, including Advanced Communications System (ACS) 4.0, B-2 Battlespace Collaborative Combat Communications, Digital High Frequency, and Hybrid Satellite Communications; plus Radar Modernization Program (RMP), B-2 displays, Military GPS User Equipment and Modular Rotary Launcher Assembly. B-52: FY 2027 funding request procures the last year of initial spares to support operations for the B-52 Radar Modernization Program (RMP) which supports nuclear and conventional operations by replacing the current APQ-166 radar on the B-52H aircraft with the AN/APQ-188 radar. The use of new technology will increase both the overall reliability of the radar system and the capabilities for new missions. RMP will allow the operational command (AF Global Strike Command) to fully utilize the capabilities of the B-52H aircraft to employ an array of weapons and perform mission-essential navigation and weather avoidance functions. C-130 Airlift Squadrons: No FY 2027 funding requested. C-17: FY 2027 funding request addresses deficiencies in C-17 Readiness Spares Package (RSP) inventory to enable new Agile Combat Employment (ACE) mission requirements. Provides deployable spares to support C-17 maintenance and repair during initial combat or contingency operations without resupply for 30 days. Additionally, this request procures initial spares for on-going modification programs to include but not limited to Beyond Line of Sight (BLOS), Replacement Heads-Up Display (RHUD), Filter Fire Mitigation (FFM), Aircraft Connectivity, training systems, and other production efforts. LI 000999 - Initial Spares/Repair Parts Air Force UNCLASSIFIED Page 3 of 7 P-1 Line #68 Volume 1 - 141 === page 178 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 06: Aircraft Spares and Repair Parts / BSA 10: Aircraft Spares and Repair Parts ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 000999 / Initial Spares/Repair Parts Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A C-5: FY 2027 funding request for initial spares will be used to procure C-5 aircraft parts through the Defense Logistics Agency (DLA) and the Air Force Sustainment Center's Supply Chain Management Group (DWCF). Funding is requested to ensure C-5 viability and improve aircraft availability in support of the Office of Secretary of War (OSW) Cost Assessment and Program Evaluation (CAPE) readiness study. Combat Developments: FY 2027 funding request to procure initial spares for E-9 Systems Modifications. Compass Call (EC-37B): FY 2027 funding request provides initial aircraft and mission systems spares for the EC-37B Compass Call Re-host Program. HH-60W (CRH): FY 2027 funding request is to procure HH-60W initial spares and initial repair parts to include, but not limited to components impacted by Diminishing Manufacturing Sources, spare parts for simulators and training devices, depot lay-in of consumables, aircraft common ground support equipment and readiness spares. CV-22: FY 2027 funding request for CV-22 initial spares for air vehicle, propulsion, survivability, and avionics programs, in addition to modernized communications and navigation equipment. E-11A: No FY 2027 funding requested. E-3 Airborne Warning and Control System (AWACS): No FY 2027 funding requested. E-4B National Airborne Operations Center (NAOC): FY 2027 funding request supports initial spares for numerous program efforts to include but not limited to Survivable Super High Frequency (SSHF) for Increment 2 common workstation, modem technology/WPM200 and Karma, Advanced Extremely High Frequency (AEHF) developed systems including Airborne Computing System (ACS), Enhanced Command Consoles (ECC), Automatic Patch and Test System (APTS), Live Data Recording Element (DRE), 10GigaByte Ethernet, and APIP developed A Kit, Touchscreen phones, processors, and displays for the Touchscreen Executive Phone Airborne system, Crisis Management System, Service Bulletins, and Low Cost Modifications. F-15 Eagle Passive/Active Warning and Survivability System (EPAWSS): No FY 2027 funding requested. F-15EX: No FY 2027 funding requested. F-15E: FY 2027 funding request to procure initial spares for F-15 modification programs including, but not limited to, Multifunctional Information Distribution Systems Joint Tactical Radio System (MIDS-JTRS), Mobile User Objective System/Second Generation Anti-Jam UHF Radio for NATO (MUOS/SATURN), and Data Transfer Module II (DTM II). F-16 Squadrons: FY 2027 fund request procures initial spares to support the fielding of multiple program efforts, including, but not limited to, Comm Suite Radio Upgrade, Modular Mission Computer (MMC) Programmable Display Generator (PDG), Secure Mission Data System (SMDS) and Active Electronically Scanned Array (AESA). For additional detail, BP11 Line Number 29 Doc can be referenced. F-22 Squadrons: FY 2027 funding request provides for the procurement of initial spares to include repairable and consumables items necessary at all levels of supply in time to support newly fielded end items. Efforts include but are not limited to the following: Link 16, Sensor Enhancement, Controlled Reception Pattern Antenna (CRPA)/Anti-Jam Global Positioning System (GPS) Antenna, Infrared Defensive System (IRDS), Mode 5 Identification Friend or Foe (IFF), Low Drag Tanks and Pylons (LDTP), Crypto, and Readiness Spares Packages (RSP). Link 16 hardware is required to enable Link 16 transmit, critical for combat operations. Sensor Enhancement hardware is required to implement advanced technology developments to maintain the platform's air superiority role. CRPA/Anti-jam GPS Antenna hardware enables Position, Navigation, and Timing (PNT) capabilities in GPS-degraded environments. IRDS hardware modernizes the Missile Launch Detector (MLD) that is focused on detection of long-range Air to Air Missile (AAM) and Surface to Air Missile (SAM) threats. Crypto hardware is required to support National Security Administration mandates. Mode 5 IFF enables IFF Challenge and Reply capabilities on all Block 30/35 F-22 aircraft. LDTP provides increased range capability while maintaining own-ship survivability. Additional initial spares may be required to support newly fielded end items which are not tied to a specific thrust but rather are a result of a small project, reliability, maintainability or sustainability retrofit. LI 000999 - Initial Spares/Repair Parts Air Force UNCLASSIFIED Page 4 of 7 P-1 Line #68 Volume 1 - 142 === page 179 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 06: Aircraft Spares and Repair Parts / BSA 10: Aircraft Spares and Repair Parts ID Code (A=Service Ready, B=Not Service Ready): P-1 Line Item Number / Title: 000999 / Initial Spares/Repair Parts Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A F-35 Squadrons: FY 2027 funding request supports the necessary production lead time for procurement of initial spares for Air Vehicle, Propulsion and Site Activation and Hardware for new production aircraft in Lot 20 and Depot Lay in spares required for F135 engine overhaul maintenance. Funding supports the Air Force's (AF) unique Deployed Spares Packages (DSP) to ensure AF requirements align with Operational Plans for Combatant Commanders. The AF share of the JSF Global Spares Pool (GSP) costs ensure proper inventory levels to support daily training and operational USAF Fleet sustainment activities. The GSP is a foundational tenet of the F-35 joint program, whereby the USAF, Navy, Marine Corps, seven international partners and twelve Foreign Military Sales (FMS) customers share the cost of spares, eliminating the need for each individual Participant to procure their own full depth and range of spares. Funding supports readiness initiatives to increase Mission Capable (MC) rates across the Enterprise and ensures procurement of spares at required levels to meet sustainment milestones for all participants. HH60W MODS: Due to an inadvertent database error, $7.0M of FY 2027 funding in P-1 Line #61, was intended for this line (P-1 Line P-68). This funding is intended to start AFDW Operational Flight Trainer spares procurement in FY 2027. FY 2027 funding request is to procure HH-60W initial spares and initial repair parts for including, but not limited to, components impacted by Diminishing Manufacturing Sources, spare parts for simulators and training devices, and spare components for modification efforts to support the HH-60W fleet and the Air Force District of Washington transfer and modification. KC-135S: FY 2027 funding request procures initial spares required to support Real Time Information in the Cockpit (RTIC) and Mobility Air Forces (MAF) Connectivity Programs for critical communications and situational awareness capabilities. KC-46: FY 2027 funding request is for initial spares parts pipeline and repair spare parts to include but not limited to spare engines to support newly fielded KC-46A aircraft and Air Mobility Command's bed-down plan, as required by title 10 U.S.C. Chapter 9A, Sec 240-D. FY 2027 funds will be used to competitively procure initial spares using multiple-award IDIQ contracts. MQ-9 UAV: FY 2027 funding request to procure minimal level of spares for Proliferated Low Earth Orbit (PLEO) and MQ-9 Multi-Domain Operations (M2DO) kits as part of the modification schedule for the fleet. RC-135 (Manned Reconnaissance Systems): FY 2027 funding request to procure initial spares in support of modifications of three different RC-135 aircraft mission design series utilizing seven separate engineering baselines. The initial spares consist of numerous non-stock listed, commercial-off-the-shelf (COTS) LRU's, SRU's and piece part electronic components necessary for initial fielding and operations at seven world-wide operating locations. Advanced Pilot Training (APT)/T-7A: FY 2027 funding request for initial spares to include but not limited to airframe, engine, readiness, and training systems to support the T-7A aircraft and devices. MH-139A: FY 2027 funding request for initial spares to include but not limited to airframe, engine, readiness, and training systems to support the MH-139A aircraft. VC-25B: FY 2027 funding request for fully mission capable spares to include but not limited to airframe, engine, readiness, and training systems to support the VC-25B aircraft and devices. Automated Test Systems: FY2027 funding will be used to replenish Electronic Warfare spares kit package inventories to meet Combatant Command Requirements. LI 000999 - Initial Spares/Repair Parts Air Force UNCLASSIFIED Page 5 of 7 P-1 Line #68 Volume 1 - 143 === page 180 === UNCLASSIFIED Date: April 2026 Exhibit P-18, Initial and Replenishment Spare and Repair Parts Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F / 06 / 10 End Item Line Item Number / Name [MDAP/MAIS] P-1 Line Item Number / Title: 000999 / Initial Spares/Repair Parts Prior Years FY 2025 ($ M) Title: Initial Spares/Repair Parts FY 2026 ($ M) FY 2027 Base ($ M) ($ M) FY 2027 OOC ($ M) FY 2027 Total ($ M) Initial BA 06 - Aircraft Spares and Repair Parts 10TRGT / Aerial Targets - 0.659 0.668 0.686 0.000 0.686 OTHACF / Precision Attack Systems Procurement - 3.759 3.811 3.919 0.000 3.919 OTHACF / Automated Test Systems - - - 1.100 0.000 1.100 B01B00 / B-1B Squadrons - - - 2.150 0.000 2.150 B00200 / B-2 Squadrons [431] - - 4.385 11.576 0.000 11.576 B05200 / B-52 Squadrons - 19.501 19.789 33.846 0.000 33.846 C13000 / C-130 Airlift Squadron - 3.879 3.208 0.000 0.000 0.000 C01700 / C-17 Aircraft (IF) - 10.405 2.549 323.276 0.000 323.276 C00500 / C-5 AIRLIFT SQUADRONS (IF) - 9.519 9.486 13.489 0.000 13.489 OTHACF / Combat Developments - 0.173 0.173 0.178 0.000 0.178 CALL00 / Compass Call - 13.949 - 28.332 0.000 28.332 H060WH / Combat Rescue Helicopter (CRH) / HH-60W [479] - 1.859 2.329 7.859 0.000 7.859 V022A0 / CV-22 [212] - 3.738 1.975 7.688 0.000 7.688 E011A0 / E-11A - 8.842 0.018 0.000 0.000 0.000 E00300 / E-3 Airborne Warning and Control System (AWACS) UPGRADE [277] - 0.351 - 0.000 0.000 0.000 E00400 / E-4B National Airborne Operations Center (NAOC) - 0.373 0.378 0.389 0.000 0.389 F15EWS / F-15 Eagle Passive/Active Warning and Survivability System (EPAWSS) [485] - 21.945 11.750 0.000 0.000 0.000 F015EX / F-15 EX - 0.000 9.040 0.000 0.000 0.000 F01500E / F-15E Squadrons - 2.861 19.327 42.299 0.000 42.299 F01600 / F-16 Squadrons - 77.373 14.564 76.451 0.000 76.451 F02200 / F-22A Squadrons [265] - 42.047 84.263 201.154 0.000 201.154 ATA000 / F-35 Squadrons [198] - 440.846 531.759 269.528 0.000 269.528 H060WM / HH60W Modifications - - - 2.118 0.000 2.118 C13500 / KC-135S - 3.219 4.839 7.958 0.000 7.958 KC046A / KC-46A Tanker Squadrons [387] - 206.754 343.500 266.748 0.000 266.748 PRDTB1 / MQ-9 UAV [424] - - 20.728 5.029 0.000 5.029 DARP01 / RC-135 (Manned Reconnaissance Systems) - 56.408 57.108 58.731 0.000 58.731 APT000 / Advanced Pilot Training (APT) T-7A [436] - 19.638 43.000 41.279 0.000 41.279 LI 000999 - Initial Spares/Repair Parts Air Force UNCLASSIFIED Page 6 of 7 P-1 Line #68 Volume 1 - 144 === page 181 === UNCLASSIFIED Date: April 2026 Exhibit P-18, Initial and Replenishment Spare and Repair Parts Justification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F / 06 / 10 End Item Line Item Number / Name [MDAP/MAIS] P-1 Line Item Number / Title: 000999 / Initial Spares/Repair Parts Prior Years FY 2025 ($ M) Title: Initial Spares/Repair Parts FY 2026 ($ M) FY 2027 Base ($ M) ($ M) FY 2027 OOC ($ M) FY 2027 Total ($ M) H0106O / MH-139A (UH-1N Replacement) [562] - 34.393 4.888 1.069 0.000 1.069 OSAEA0 / VC-25B - - - 34.200 0.000 34.200 Subtotal: Initial - 982.491 1,193.535 1,441.052 0.000 1,441.052 Total Cost (Initial + Replenishment) - 982.491 1,193.535 1,441.052 0.000 1,441.052 LI 000999 - Initial Spares/Repair Parts Air Force UNCLASSIFIED Page 7 of 7 P-1 Line #68 Volume 1 - 145 === page 182 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 146 === page 183 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities 000071 / Aircraft Replacement Support Equip / BSA 1: Common Support Equipment Program Elements for Code B Items: 0202834F ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 90.872 90.872 90.872 162.813 162.813 162.813 156.776 156.776 156.776 252.808 - - 252.808 - - 252.808 - 252.808 252.808 252.808 446.231 446.231 446.231 463.580 463.580 463.580 544.086 544.086 544.086 To FY 2031 Complete 443.965 443.965 443.965 Total - 2,561.131 - 2,561.131 - 2,561.131 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: In direct support of the Secretary of War's direction to increase readiness across the Department of War, efforts within this Program Element Code (PEC) will be prioritized in alignment with the National Defense Authorization Act (NDAA), U.S. Air Force Force Design, Agile Combat Employment (ACE), and the Defense Planning Guidance (DPG). These efforts will support work and collaboration efforts across the Combat Readiness Directorate in PE's 0708051F, 0701212F, 0702833F, 0604706F, 0605827F, 0202834F, 0502834F, 0502844F, 0208031F, 0401135F and 0207521F) -- to increase readiness across the Air Force Enterprise This program provides funding for the procurement of replacement organizational and intermediate level support equipment for out-of-production aircraft. These items, common (used on more than one weapon system) and peculiar (unique to one weapon system), directly support aircraft maintenance, servicing, and sortie generation requirements. These replacement requirements ensure continuation of serviceable, supportable equipment over the life of a weapon system and directly contribute to aircraft availability and mission readiness. Items requiring replacement typically range in age from 10 to 35 years old. As a result, this equipment suffers frequent failures, is uneconomical to repair, and requires spare parts that are no longer available. Many items have become technologically obsolete or must be replaced due to environmental operating constraints. Items of equipment budgeted within this program include (but are not limited to): avionics test stations, miscellaneous aerospace ground equipment, aircraft handling equipment, aircraft maintenance stands, flight line compressors, air conditioners and heaters, aerial stores lift trucks (jammers) and weapon loading adapters, ammunition loaders and munitions assembly conveyors, cryogenic equipment, small and large munitions trailers, flight line generators and secondary power systems, electronic test sets, propulsion support equipment, calibration, optical and ancillary testers, automatic test systems and multi-function /multi-capability equipment where it is suitable for the mission. These items support multiple Air Force weapon systems. Failure to procure these items will negatively affect mission capable rates, increase maintenance costs, and impair USAF Aircraft generation timelines. PROGRAMS SUPPORTED: Flight Line Air Conditioners /Heating, Ventilating and Air Conditioning (HVAC)(SEV) The Flight Line HVAC program provides the capability to operate aircraft systems, both nuclear and conventional, that require environmental control during ground operations. The program consists of 150+ different National Stock Numbers which consists of air conditioners, heaters, liquid coolant carts, refrigerant reclamation systems, and multi-function/multi-capable type carts. Included in the programs capabilities are the high /low volume, high /low pressure deployable air conditioners in support of all aircraft in the USAF inventory. Its purpose is to provide conditioned air for supporting pre-flight activities and ground maintenance efforts for electronic laden aircraft supporting radar, avionic and telemetry systems. Operational assessments determined that legacy air conditioners were not performing to their specified operating temperatures. These air conditioners have exceeded their 20-year life expectancy. The age of this equipment, High ops tempo, high temperatures, and other environmental conditions in the Middle East have caused legacy air conditioners to fail, affecting operational readiness and jeopardizing critical mission. Due to obsolescence, continued modification of legacy equipment is becoming non feasible and /or cost LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 1 of 36 P-1 Line #71 Volume 1 - 147 === page 184 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities 000071 / Aircraft Replacement Support Equip / BSA 1: Common Support Equipment ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: 0202834F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A prohibitive. Lack of dependable air conditioning equipment continues to cause operational impacts such as rescheduling maintenance activities to nighttime operations or delaying sorties in order to avoid overheating of critical electronic warfare /avionics systems and personnel. Consequently, the warfighter has established a critical need for large and small flight line air conditioner replacement programs. The primary goals of this program are to replace the legacy units. The new large air conditioners will replace three legacy systems (approx. 400 units). The new small air conditioners will replace five legacy systems (approx. 2,400 units). This program will partner with the Flightline Generator program to acquire the Multi-Capable Power and Air ACE Unit to support PACAF. Aerial Stores Lift Trucks (SEV) The Aerial Stores Lift Trucks program acquires air transportable, nuclear certified hydraulically operated lift equipment (and associated accessories) used to load conventional and nuclear weapons, fuel tanks, Electronic Counter Measure pods, and pylons. This program consists of 122 different National Stock Numbers. The lift trucks in inventory are capable of lifting various weights. Updated lift trucks allow the USAF to retain this capability while also improving mobility footprint by reducing the level of failures and repairs and procuring more ideal sizes to meet combat needs for conventional and nuclear units. Lift trucks are used in support of the A-10, B-1, B-2, B-52, C-130, F-15, F-16, F-22, F-35 and KC-46 aircraft. Users of the lift trucks include USAF, ANG, AFRC, and FMS. The goal of this program is to re-capitalize the aging munitions loading equipment for continual mission support. Additionally, depot repair of legacy lift trucks has been uneconomical, exceeding new procurement costs of equipment. The program is pursuing modernized loaders to develop a family of nuclear certified jammers for all weight classes. Munitions Materiel Handling (MHU) 196 /204 Service Life Extension Program (SLEP)(SEV) MHU-196 /204 trailers have been in service since 1982 and have been identified for a Limited Service Life Extension Program (SLEP). These trailers are self-powered, heavy duty, U-type frame munitions trailers with 40,000 lbs lift capacity used to transport, lift rotary launchers and bomb racks with conventional and nuclear munitions for supporting B-1, B-2, and B-52 aircraft missions. Through requirements documentation (AF Form 1067, Modification Proposals, AFMC Lead Command Control No. A4M200007 and A4M200008), AFGSC identified the requirement to preserve the heavyweight loading capability in support of the B-1 and B-2 until approximately 2035 and the B-52 until 2050 or beyond. This program intends to extend the reliability and supportability of the MHU-196 /204 trailers and provide a comprehensive assessment of anticipated end-of-life, ensuring AFGSC & USSTRATCOM bomber generation requirements are fulfilled. At present time, no other heavy lift devices have been identified to meet mission and nuclear safety requirements. Items Less Than 5M (SEV, ATS, AFSC) The Items Less Than 5 Million line procures replacement organizational and intermediate (common and peculiar) support equipment for out-of-production aircraft. All items procured under this requirement have been moved to the family of systems in which the belong for FY20. ATS - Base Maintenance and Support Equipment (ATS) ATS - Base Maintenance and Support Equipment procurement dollars will be used in support of the purchase /upgrades of Armament Test Sets, purchase of Common Cargo ATS, hardware, TPS and other support to ensure cyber secure Automatic Test Systems and costs associated with Common items (used on more than one weapon system) and peculiar items (unique to one weapon system) automated test equipment for the Automatic Test Systems Division. These replacement items ensure continuation of serviceable equipment over the life of a weapon system. Items for procurement include, but are not limited to, test adapter kits, transponder test sets, Portable Automatic Test Sets, Radar Signal Simulators (RSS), logistics under attack cyber efforts, digital test stations, automated wire test sets, propulsion automatic test equipment, automatic test equipment calibration, smart weapons test sets, optical and ancillary testers, Commercial Off the Shelf (COTS) Automatic Test Equipment (ATE). Funds will also be utilized for procurement of replacement support equipment for out-of-production aircraft. Includes common (used on more than one weapon system) and peculiar (unique to one weapon system), which directly support aircraft maintenance and servicing requirements. The ATS program office re-structured its portfolio into seven capabilities/groups to facilitate enterprise management of ATS; operational flexibility and agility required... to launch decisive operations against targets anywhere in the world, including directly from the U.S. Homeland. ATS supports multiple weapon systems; drive to common solutions ensuring interoperability. ATS continues to accelerate digital transformation; focused on delivering ATS relevant in High End fight. The seven capability groups are: ATS Innovation/Digital Transformation - This program is the only path to fielding the test solutions required for the Air Force's next-generation platforms (NGAD, B-21, Sentinel) and the core strategic goal of achieving 'operational flexibility and agility.' It is not an upgrade; it is a prerequisite for the future force. The Game-Changing Solution: It delivers this capability by executing the AF Digital Strategy—using ModelBased Systems Engineering (MBSE), Digital Twins, and MOSA; to slash development timelines from years to months. This ensures our test solutions evolve at the speed of software, keeping pace with agile adversaries. The Strategy is Proven: This approach is not theoretical; it is proven by efforts like the Common Aircraft Tester - Fighter (CAT-F) program, which consolidates multiple legacy testers into a single, flexible platform, dramatically reducing the logistics footprint and lifecycle costs. LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 2 of 36 P-1 Line #71 Volume 1 - 148 === page 185 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities 000071 / Aircraft Replacement Support Equip / BSA 1: Common Support Equipment ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: 0202834F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Armament & Stores ATS - The Critical Mission: Ensuring Foundational Readiness & Lethality: This program delivers the foundational test capability that ensures the "readiness, lethality, range, and survivability of the Joint Force. We field common systems like the Common Organizational Level Tester (COLT) for conventional readiness and, more critically, sustain the highly specialized, nuclear-certified testers that guarantee a "strong, secure, and effective nuclear arsenal for platforms like the B-52, B-2, and F-22. The Armament ATS program provides test capability to ensure the aircrafts weapon release system is working properly. The Program consists of the B-2/F-22 Common Organizational Level Tester, B-52/ AGM-86 Cruise Missile Automatic Test System & B-2 Electronic System Test Station (ESTS-C), F-15 Armament Testers (T-197, T-198, T-199), F-15 Aircraft Pod Interface Test Set (APITS), F-16 Stores System Tester (SST) & Armament Circuits Pre-load Test Set (ACPTS), B-52 Multi-use System Tester Armament Next Generation (MUSTANG). The COLT ensures the weapons release systems are working properly (B-2 Rotary Launch Assembly, Smart Bomb Rack Assembly, Massive Ordinance Penetrator rack & the F-22 pylons, bomb racks, aircraft stores management system). The CM-ATS verifies the functions of the AGM-86 Cruise Missile navigation systems, the SUU-72 pylon, and for the B-2 RLA, SBRA, and MOP shop replaceable units. The F-15 Armament Testers certifies the aircrafts stores management systems, missile launchers, bomb racks and pylons. The F-15 T-199 verifies the aircraft is safe to load weapons. The APITS tests the ASQ-236 reconnaissance POD and the Data Link System. The F-16 SST certifies the aircrafts stores management systems, missile launchers, bomb racks and pylons. The F-16 ACPTS verifies the aircraft is safe to load weapons. The B-52 MUSTANG certifies the aircrafts stores management systems, bomb racks and pylons. Avionics ATS - The Unacceptable Reality: A Crisis in the Foundation of Military Strength: This program -confronts a readiness crisis that directly undermines our ability to "Supercharge the U.S. Defense Industrial Base. 72% of our Avionics ATS inventory is operating beyond its 32-year average service life. This is an active, ongoing failure of the DIB's foundational layer, driven by unsustainable Diminishing Manufacturing Sources (DMSMS) that makes our core test infrastructure unsupportable and our military power brittle. B-1B ADTS: A level tester that is designed as a replacement for the Digital and Analog Video test stations. It is used to test and diagnose LRUs of the B-1 defensive systems that are used in the depot and backshop facilities. It is currently in the operations and support lifecycle phase. B-1B EPCAT: A level tester that provides maintenance capabilities used to test and diagnose potential issues and faults of the B-1Bs Shop Replacement Units (SRU), or LRUs. It is currently in the operations and support lifecycle phase. B-1B IATE: A level tester that tests LRUs and provides diagnostic capabilities for the Defense Avionics Systems. It is currently in the operations and support lifecycle phase. BRAT: A common radio frequency and connector tester that provides basic testing capabilities for analog, digital, and radiofrequency electronics. It supports multiple platforms such as the A-10, F-15 and C-5. It is currently in the operation and support lifecycle phase. F-15 AFCSTS: A system that performs maintenance and testing for F-15 flight control systems, while isolating defective aircraft LRUs. It is currently in the operation and support lifecycle phase. F-15 AIS: Maintenance equipment that provides diagnostic capabilities for F-15 radar systems. It is currently in the operation and support lifecycle phase. F-15 ESTS: A level tester designed to test F-15 avionics LRUs for faults, while providing additional diagnostic capabilities. It is currently in the operation and support lifecycle phase. F-16 MBFI: A diagnostic tool that is designed to troubleshoot multiplex 1553 communication, isolate faults within matrix assemblies, and remedy broken wires and/or pins. It is currently in the sustainment lifecycle phase. VDATS: An Air Force family of avionics core testers that is designed for depot testing capabilities and is an organically developed effort. It is currently in the sustainment lifecycle phase. Electronic Warfare ATS - The Unavoidable Reality: The Threat Has Evolved: The electromagnetic spectrum is a dynamic, contested battlespace. Adversaries are fielding adaptive, "cognitive" EW systems that our legacy testers cannot simulate. This creates a critical and unknown survivability gap for every pilot entering contested airspace. The Core Mission: Validating Survival: Modern EW suites are defined by their software Mission Data Files (MDFs). This program provides the only capability to validate these MDFs against modern, agile threats. Without this validation, a pilot cannot trust that their aircraft's defensive systems will function, leaving them vulnerable. The program consists of the Joint Services Electronic Combat Systems Tester (JSECST), the Electronic Warfare Chaff/Flare (ALM-288), the Countermeasures Test Set (USM-646A) and the B-1B Enhanced Automated Special Test Equipment (B-1B EASTE). JSECST (USM-670A) provides end-to-end EW systems functional testing capability. Automatically/Manually determines the Go/No-Go status of an Electronic Combat (EC) system installed in or on operation aircraft with minimal technician interaction. Electronic Warfare (EW) Chaff/Flare checks operation of EW Chaff and Flare dispensers. Countermeasures Test Set (CTS) USM-464A is a peculiar B-52 tester program that provides testing of aircraft Electronic Combat (EC) systems to provide Go/No-Go and end-to-end performance verification testing of the EC system. B-1B EASTE is an operational level tester that provides end-to-end testing on B-1B AN/ALQ-161 Defensive Avionics System. Software Loader/Verifier & BIT ATS - The Critical 'Last Step' to Lethality: This portfolio is the only secure gateway for loading the software, mission data, and flight programs that define a weapon system's modern capabilities. It is the essential link that enables the software-defined weapon and is a non-negotiable requirement for mission success across the Joint Force. LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 3 of 36 P-1 Line #71 Volume 1 - 149 === page 186 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities 000071 / Aircraft Replacement Support Equip / BSA 1: Common Support Equipment ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: 0202834F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A An Absolute Prerequisite for the NDS: Enabling Decisive Operations: The ability to securely reprogram weapon systems at the point of need is fundamental to achieving the "operational flexibility and agility mandated by the NDS. Without this capability, our forces cannot adapt at speed, leaving them slow, predictable, and critically vulnerable in a contested environment. This isn't about one concept: it's about our ability to win. The Program consists of the Common Aircraft Portable Reprogramming Equipment (CAPRE), F-16 Viper peculiar loader/multi-bus fault indicator (MBFI), common munitions BIT reprogramming equipment (CMBRE) test systems, and service life extension project for the CMBRE system. CAPRE reprograms aircraft computer software, updates threat data in electronic warfare pods, performs aircraft diagnostic troubleshooting, and supports automated technical orders. CAPRE consists of a mobile maintenance terminal, cables, interface modules, software, and Aircraft Adapter Groups (AAGs). Critical to CAPRE are the AAGs. AAGs connect CAPRE laptops, test equipment, and Line Replaceable Units (LRU) on support weapon systems. The F-16 Viper/MBFI provides data exchange and diagnostic capabilities to all blocks of F-16 aircraft. The Viper consists of a ruggedized laptop, interface adapter, and cables. The CMBRE is a munitions tester that provides BIT status; uploads/downloads and verifies software, including Operational Flight Programs (OFP), mission planning data, and/or Global Positioning System (GPS) crypto keys. The CMBRE consists of a ruggedized laptop Digital Computer Assembly (DCA); a Test Adapter Unit (TAU); a switch box and individualized cables for connection to weapons. A SLEP is in work for the 20-year-old CMBRE to address severe obsolescence and DMSMS issues, Radar and IFF ATS - The Non-Negotiable Mandate: Preventing "Blue-on-Blue" Engagements: A DoW-wide mandate to transition to encrypted Mode 5/S makes modernization an absolute imperative. This is the foundation for preventing fratricide and ensuring combat identification in a contested environment. The Gap: Our legacy testers cannot certify these secure formats, creating a critical and unacceptable risk to the force. The Strategic Imperative: Enabling the NDS: This capability is a non-negotiable prerequisite for "operational flexibility and agility. The Risk: In a dispersed operation, the inability to certify Combat ID at the point of need with a modern, portable tester creates a potentially fatal mission risk. Our forces must have this organic capability to survive and win. The program consists of the Identification Friend or Foe testers, Radar Test Set (IFF-RTS) (TS-4530/UPM), the Radar Signal Simulator (AN/PLM-4), the Radio Frequency Transmission Line Test Set (RFTLTS), the B-52 Radar Test Set (RTS) AN/UPM-440), and the Electrical Electronic Equipment Test Set (EEETS). B-1B ARTS replaces the legacy ATS used to test ALQ-161 Defensive Avionics System (DAS) on the B-1B. TS-4530/UPM provides test capability of the IFF systems for all United States Air Force aircraft prior to flight. PLM-4 Radar Signal Simulator (RSS) provides flight line confidence check of Electronic Combat Systems. RFTLTS provides automatic testing and fault isolation of coaxial and waveguide transmission systems and components. B-52 RTS provides maintenance testing for the B-52 Strategic Radar and Offensive Avionics Systems. EEETS is used to diagnose and isolate faults/failures on APQ-170/APQ-180 Radars, Mission Computers, AIC-38/40 Communication Systems and AC-130U Displays Specialized ATS - Fills Critical Gaps: Delivers unique test solutions for mission-essential systems (e.g., Helmet Mounted Cueing) that are not supported by common platforms. Without these, entire weapon systems are grounded, creating unacceptable gaps in our force structure. Incorporate OSW Special Interest Item Electronic Intermittent Fault Detection (EIFD) as an ATS Program of Record to combat 10B DOW annual intermittent fault incidents and lead AF solution. The Foundation of Trust: Fields the calibration systems (e.g., Portable Automatic Test Equipment Calibrator (PATEC)) that serve as the "source of truth" for the entire test enterprise. The accuracy of every other tester, from depot to flight line, depends on the integrity of this foundation. The Program includes but not limited to, Portable Automatic Test Calibration Equipment (PATEC) , Automatic Wire Test Set (AWTS), F-15 Suitcase tester, Test Measurement Diagnostic Equipment (TMDE), Helmet Cuing System ATE (HCS-ATE), B-1B O-Level ATS, B-1B Oil Cooling Cart, Common Cargo, Depot Hydraulics/ Pneudraulic, and Mature Proven A/C ATS. PATEC is a portable calibration test system capable of calibrating over 40 different automatic test stations used on multiple weapon systems. AWTS Ensures critical testing for organizational, back shop and depot level resolution of wiring/ component anomalies to support aircraft missions. Common cargo consists of 300+ pieces of equipment managed at the End Item level, used on aircraft, to validate suspected failed components by performing troubleshooting and go/no-go functions. The HCS-ATE provides ability to check proper operation of helmet mounted devices. PMA Other Government Costs applies to travel in relation to multiple platforms to include, but are not limited to F-16, B-52, B-1, B-2, F-15, A-10, cyber support, and other government costs in support of Automatic Test Systems programs and the Automatic Test System program office. Programs include, but are not limited to, ATS Standardization, Portable Automatic Test Sets (PATS), Identification Friend or Foe-Radar Test Set (IFF-RTS), Electrical Electronics Equipment Test Station (EEETS),Common Organizational Level Tester (COLT), Armament Test Sets (ATS), Automated Wiring Test Set (AWTS), Electronic Warfare (EW) Chaff /Flare, Radar Signal Simulator (RSS)(AN /PLM-4), Radio Frequency Transmission Line Test Set (RFTLTS), Benchtop Reprogrammable Test System (BRAT), Helmet Cueing System Automatic Test Equipment (HCS-ATE)Commercial Off the Shelf (COTS) Automatic Test Equipment (ATE). Hydraulic Servicing Equipment (SEV) LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 4 of 36 P-1 Line #71 Volume 1 - 150 === page 187 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities 000071 / Aircraft Replacement Support Equip / BSA 1: Common Support Equipment ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: 0202834F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A The Hydraulic Servicing Equipment program will re-capitalize over 44 legacy variants of hydraulic test stands in USAF inventory. This program consists of 280 different National Stock Numbers. The primary effort is procurement of the universal hydraulic test stand (UHTS) which comes in electric and diesel, 2-system and 3-system configurations, depending on aircraft and maintenance requirements. The UHTS provides pressure to aircraft hydraulic systems without running the engines. It also adds on-board hydraulic fluid purification capability to eliminate the need for standalone purifiers. To reduce the cost of ownership, simplify life cycle sustainment and improve global operations, the UHTS variants share an 80-90% parts commonality and were designed for ease of maintenance. The UHTS cleans hydraulic fluid to a higher purity than received from the manufacturer, drastically reducing the wear and tear and early age-out of aircraft component parts, increasing aircraft availability and mission readiness. Nondestructive Inspection (NDI) & Oil Analysis Program (OAP)(SEV) The NDI /OAP program provides a twofold capability. NDI equipment is used to find cracks, corrosion and other signs of impending failure in an aging fleet of aircraft and support equipment. Oil analysis equipment detects impending aircraft bearing, gearbox and engine failures. This program supports mandated inspection procedures of all variants of aircraft and aircraft engines in the USAF inventory. These capabilities represent 218 different National Stock Numbers. Many items within NDI & OAP program use electronics which are increasingly unsustainable. The goal of this program is to capture advances in technology preparing Air Force for new missions /equipment while also increasing effectiveness and accuracy of inspections. Additionally, for NDI, conversion to digital X-Ray equipment eliminates need for costly film and processing supplies which utilize hazardous materials. Aircraft Engine Test Equipment (AETE)(SEV) The AETE program provides the capability for the warfighter to download, test, repair, troubleshoot and analyze engine data on all variants of aircraft found in the United States Air Force inventory. This program consists of, but is not limited to; engine test stands, engine test fixtures and adapters, noise suppressors (equipment that is designed to house and reduce the noise of engines while being tested), engine test sets & engine download devices (various pieces of equipment that support the analysis of engines and potential issues needing maintenance attention). These capabilities represent approximately over 450 different National Stock Number items. The goal of this program is to support the replacement of antiquated legacy equipment or fill the large gaps in the authorized vs "on-hand equipment. A majority of flight line testers are beyond their serviceable life and must be replaced. Aircraft Engine Handling Equipment (AEHE)(SEV) The AEHE program will procure various equipment that provide the capability to remove /install, store and transport aircraft engines. This equipment supports all variants of aircraft found in the USAF inventory. The program currently consists of 256 different National Stock Numbers items. These items include, but are not limited to, aircraft engine trailers, ground handling adapters, ground handling cradles and engine holding fixtures. The goal of this program is to replace the aging equipment that has exceeded its service life, many by 20-30 years. Due to the age of the equipment, the AF is challenged due to parts obsolescence. This is causing trailers in the field to be cannibalized to garner replacement parts to support the aircraft mission. This is quickly becoming an unsustainable activity to maintain fleet readiness. Aircraft Maintenance Test (AMT)(SEV) The AMT program acquires equipment that provides the capability for flight line personnel to test, analyze, troubleshoot and repair aircraft sub-systems. This capability is critical for aircraft maintainers to maintain readiness of the USAF aircraft fleet. Equipment under this program includes avionics, electrical and mechanical testers as well as boresights and optical equipment. Items in this portfolio are used on all USAF aircraft across all Major Commands at both home station and deployed locations. Legacy systems are aging and facing obsolescence issues and rising repair costs. Flight Line Maintenance Stands (SEV) The Flight Line Maintenance Stands program is responsible for procurement of stands utilized by aircraft technicians to work safely at various heights while performing maintenance and inspections on multiple aircraft weapon systems. This program consists of 173 different National Stock Numbers. The goal of the program is to modernize the 40+ year old legacy stand designs, which are no longer supported by the Original Equipment Manufacturers. Currently, the legacy stands do not meet OSHAs and Air Force Safety Office recently imposed standards. Procurement of the new safety compliant stands will provide critical fall protection for flight line and hanger maintenance operations which reduces maintenance costs and increases safety for our airmen. Flight Line Generators (SEV) The Flight Line Generator program supports the procurement of modernized equipment providing ground power capability to support the launch and maintenance of all aircraft platforms within the USAF inventory. The program currently consists of 34 different National Stock Numbers. The primary goal of this program is to re-capitalize the aging generator fleet. The large generator sets provide necessary electrical power to support the USAFs Low Density /High Demand fleet; E-3, E-4B, E-8, EC-130, and RC-135 aircraft. The small generator sets provide the necessary power to support the rest of the USAF aircraft fleet. As a whole, 70% of the legacy generators on the flight line have exceeded the 20-year service life by an average of eight years. These systems are rapidly becoming unsupportable due to growing LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 5 of 36 P-1 Line #71 Volume 1 - 151 === page 188 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities 000071 / Aircraft Replacement Support Equip / BSA 1: Common Support Equipment ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: 0202834F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A costs, age and parts obsolescence, increasing the risk to mission readiness across the various aircraft platforms. Additionally, depot repair of legacy generators have become uneconomical as these costs are now up to triple the procurement cost of a newer, more universally compatible power unit. The goal of this program is to replace antiquated and exhausted generator sets and reduce the number of models in the field to decrease overall USAF footprint, and also has other benefits as newer generators up to 70% less fuel than current turbine generators in use. This will be accomplished with replacement power units and multi-function/multi-capable type units which will both reduce USAF mobility footprint, and enable a more agile combat employment of the forces. This program is partnering with the Flightline Heating, Ventilating, Air Conditioning program to acquire the Mutli-Capable Power and Air ACE Unit to support PACAF. Flight Line Compressors (SEV) The Flight Line Compressor program provides dry, compressed air for power tools, aircraft engine start and servicing. The program consists of 275 different National Stock Numbers. Without the availability of mobile compressors, maintenance times increase due to required manual operation of hand tools. The high pressure compressors also are the only units capable of providing the required air to operate the F-16 missile rail system and 20mm ammunition loading systems. This program replaces numerous legacy systems reducing operational costs and improving maintenance capability. Newer systems provide higher performance /efficiency with increased air volume needed for advanced aircraft (F-22, F-35, and KC-46). A new workload recently added to this portfolio is pneumatic lifting bags. These bags are crash damaged or disabled aircraft recovery (CDDAR) devices used to lift damaged or crippled aircraft where it is impractical or impossible to use standard aircraft jacks. There are currently 26 bases with less than 50% asset availability that may not be able to effectively clear their active runway in the event of a crashed aircraft. Secondary Power(SEV) The Secondary Power program provides multiple pieces of electrical equipment including, but not limited to, load banks, frequency converters, power supplies, distribution boxes, and lighting equipment which support aircraft both on the flight line and back shop operations. It provides external ground power and illumination for every USAF aircraft. The program consists of 134 different National Stock Numbers used in direct support of testing /repair of aircraft avionics and communication equipment. Without this capability, field repair of aircraft line repairable units is impossible, increasing the supply chain and repair costs. Two of the larger projects within the program are the 100kW load bank and four-wheel light cart. The load bank is a portable, trailer-mounted, four-wheel chassis designed to test /troubleshoot loads on small flight line generators at multiple voltages. The four-wheel light cart is a self-contained, mobile power generating light source used for essential lighting on the flight line. Cryogenic Systems(SEV) The Cryogenic Systems program provides the capability for aircraft maintenance personnel to service critical aircraft life support systems using oxygen and nitrogen servicing equipment. This program consist of 79 different National Stock Numbers. The newest acquisition in this program, the High Purity Self Generating Nitrogen Servicing Cart, meets fifth generation requirements and reduces the logistics footprint of legacy systems and is in high demand by the warfighter. The goal of this program is to replace legacy systems that have exceeded the 20-year service life and units exhausted from high ops tempo, experiencing increased maintenance downtime and sustainment costs. Miscellaneous Aerospace Ground Equipment (AGE)(SEV) The Miscellaneous AGE program consists of aircraft handling equipment along with multiple pieces of flight line support equipment and aircraft maintenance equipment. The program contains over 3,000 different National Stock Numbers supporting all USAF aircraft. The Miscellaneous AGE portfolio includes, but is not limited to aircraft jacks, aircraft towbars, aircraft slings, hoists, various aircraft fixtures, aircraft ladders, ground handling equipment, and bearings. Two of the primary projects within this program are the Hydraulic Pumping Unit (HPU) and the Multi-Aircraft Canopy Crane. HPU is a four-wheel mounted, diesel and electric driven unit capable of operating multiple jacks simultaneously on the KC-135, C-130, C-17, C-5, E-3, E-8 and B-52 aircraft. This new dual powered unit replaces legacy models experiencing obsolescence and reaching its life expectancy. The Multi-Aircraft Canopy Crane has a lifting capability of 1,500 lbs and is utilized by F-15, F16, F-22, F-35, U2, HH60, T-38 and B-52 aircraft. It is used to remove /install various aircraft components such as canopy ejection seats, ammunition drums and vertical stabilizers. The legacy crane is also much larger, requiring a bigger logistics footprint for deployments and is also experiencing maintenance and parts availability issues. C-5 Common Support Equipment required for the C-5 Pylon Wing Interface (PWI) repair. Equipment needed due to the requirements of removing the engines, pylons, and zero-loading the wing structures. The support equipment will include items such as aircraft Jacks, Jack Pads, Adaptors, Dollies and Slings. This equipment provides the capability to conduct repairs concurrently on up to 3x aircraft. It increases storage of Engines, Pylons, Cowlings to 4 Shipsets and provides the capability to zero-load the wing structures. Program Element 0401119F. LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 6 of 36 P-1 Line #71 Volume 1 - 152 === page 189 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities 000071 / Aircraft Replacement Support Equip / BSA 1: Common Support Equipment Program Elements for Code B Items: 0202834F ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A The ATS described in this document were evaluated /approved by the Automatic Test Systems (ATS) Division Chief and are in line with the USAF ATS objective. The ATS program office is focused on reducing weapon system-unique ATS through replacement with a Common Versatile ATS tester that can perform similar testing across multiple weapon system platforms. The ATS Division ensures collaborative requirements planning for new ATS to reduce proliferation of new weapon system-unique ATS. FY26-27 funds will be utilized for the ATS portfolio, which consists of approximately 8,000 individually configured pieces of test equipment. The ATS program office is responsible for the modernization, procurement, sustainment, and recapitalization of this equipment. Included in this portfolio are 8 nuclear certified testers. They are Bomber Armament Tester (BAT), B-52 Multi-Use Systems Tester Armament Next Generation (MUSTANG),Cruise Missile Automatic Test Systems (CM-ATS),B-2 Common Organizational Level Tester (COLT), F-16 Stores System Tester (SST), F-15 Armament Testers (T-198 & T-199), F-16 Armament Circuits Preload Test Set (ACPTS). Requirement for cyber security: Increased emphasis and new direction regarding cyber security of off-network information systems (platform information technology, PIT) is driving the requirement to perform certification and accreditation (C&A) of new and legacy Automatic Test Systems (ATS) in order to obtain an authority-to-operate (ATO) for the system. The requirement to perform C&A on PIT involves an analysis of system architecture and a subsequent risk-based assessment of vulnerabilities. A mitigation plan for identified vulnerabilities is developed resulting in a Plan of Action and Milestones (POAM) Funds will be used to procure and re-capitalize the ATS Product Group which consists of: Armament and Stores ATS Avionics Electronic Warfare ATS Software Loader /Verifier and Built-in-Test ATS Radar and Identification Friend or Foe ATS Specialized ATS ATS Innovation Digital Transformation to include proven commercial and /or Government off-the-shelf ATS to replace legacy and obsolete systems to ensure persistent logistics and enable agile combat employment. This is an engineering intensive activity. This requirement (or modification) supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. In accordance with Section 1815 of the FY 2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency responses, and providing military support to civil authorities. Funding for this exhibit contained in PE 0202834F, 0502834F, 0502844F, 0701212F, and 0401119F. Secondary Distribution AF Quantity Total Obligation Authority AFNG Quantity Total Obligation Authority AFR Quantity LI 000071 - Aircraft Replacement Support Equip Air Force FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 452 1,073 1,576 0 1,576 - - - - 123.233 116.705 211.567 0.000 211.567 20.642 10.221 - - 134 126 126 0 126 - - - - 25.321 25.589 26.386 0.000 26.386 - - - - 77 64 64 0 64 - - - - UNCLASSIFIED Page 7 of 36 P-1 Line #71 Volume 1 - 153 === page 190 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities 000071 / Aircraft Replacement Support Equip / BSA 1: Common Support Equipment Program Elements for Code B Items: 0202834F ID Code (A=Service Ready, B=Not Service Ready): Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Secondary Distribution Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 000071 - Aircraft Replacement Support Equip Air Force FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 14.259 14.482 14.855 0.000 14.855 - - - - 663 1,263 1,766 0 1,766 - - - - 162.813 156.776 252.808 0.000 252.808 20.642 10.221 - - UNCLASSIFIED Page 8 of 36 P-1 Line #71 Volume 1 - 154 === page 191 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities 000071 / Aircraft Replacement Support Equip / BSA 1: Common Support Equipment ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: 0202834F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Aerial Stores Lift Trucks - / - P-40a Aircraft Maintenance Secondary Power - / - P-40a Aircraft Maintenance Testers P-3a 1 / MHU-196/204 SLEP (Service Life Extension) P-40a Ammunition Loading Equipment P-40a - - - / 0.150 - / - - / 0.150 / 10.007 - / - - / 10.007 / - - / 14.869 - / 6.709 - / 17.201 - / - - / 18.052 - / 2.990 - / 3.074 ATS - Base Maint and Spt Eq - / - - / 30.344 - / 15.519 - P-40a ATS TMDE-Electronic - / - - / 4.166 - P-40a BP12 ITEMS LESS THAN 5 MILLION DOLLARS - / - - / 0.000 P-40a C-5 Common Support Equipment - / - - / 3.173 - / 3.231 P-40a Flight Line Generators - / - - / 66.111 - / 72.197 P-40a FLIGHTLINE COMPRESSORS - / - - / 0.865 P-40a Flightline Heating, Ventilating, Air Conditioning - / - - / 21.264 - P-40a Hydraulic Servicing Equipment - / - - / 3.140 - P-40a MISC AEROSPACE GROUND EQUIP (AGE) - / - - / - P-40a Nondestructive Inspection (NDI) Joint Oil Analysis Program (JOAP) - / - - / - P-40 Total Gross/Weapon System Cost Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code / 90.872 - / 162.813 - - / 14.651 - / - / / 8.835 - - - - / 90.872 B / - / / 1.047 - - - - / - - / 14.869 / 0.000 - / 17.201 - / - - / 3.074 / 23.678 - / - - / 23.678 - / 4.222 - / 4.318 - / - - / 4.318 / - - / 30.409 - / - - / 30.409 - / - - / - - / - - / / 74.859 / - - / - / 31.419 - / 36.370 - / - - / 36.370 / 4.285 - / 12.055 - / - - / 12.055 / - - / 18.210 - / - - / 18.210 / 7.369 - / 7.608 - / - - / 252.808 - / - / 156.776 - / / 74.859 - - / - / 7.608 - / 252.808 FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Aerial Stores Lift Trucks - / - - / - - / - - / - - / - - / - P-40a Aircraft Maintenance Secondary Power - / - - / - - / - - / - - / - - / - P-40a Aircraft Maintenance Testers - / - - / - - / - - / - - / - - P-3a 1 / MHU-196/204 SLEP (Service Life Extension) / 0.000 - / - - / - P-40a Ammunition Loading Equipment - / - - / - - / - - / - - / - - / - P-40a ATS - Base Maint and Spt Eq - / - - / - - / - - / - - / - - / - P-40a ATS TMDE-Electronic - / - - / - - / - - / - - / - - / - P-40a BP12 ITEMS LESS THAN 5 MILLION DOLLARS - / - - / - - / - - / - - / - - / - P-40a C-5 Common Support Equipment - / - - / - - / - - / - - / - - / - P-40a Flight Line Generators - / - - / - - / - - / - - / - - / - P-40a FLIGHTLINE COMPRESSORS - / - - / - - / - - / - - / - - / - P-40a Flightline Heating, Ventilating, Air Conditioning - / - - / - - / - - / - - / - - / - P-40a Hydraulic Servicing Equipment - / - - / - - / - - / - - / - - / - P-40a MISC AEROSPACE GROUND EQUIP (AGE) - / - - / - - / - - / - - / - - / - LI 000071 - Aircraft Replacement Support Equip Air Force B - / 20.642 - / 10.221 UNCLASSIFIED Page 9 of 36 - P-1 Line #71 - / / 160.296 Volume 1 - 155 === page 192 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities 000071 / Aircraft Replacement Support Equip / BSA 1: Common Support Equipment ID Code (A=Service Ready, B=Not Service Ready): Program Elements for Code B Items: 0202834F Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* P-40a Nondestructive Inspection (NDI) Joint Oil Analysis Program (JOAP) P-40 Total Gross/Weapon System Cost Subexhibits ID CD MDAP/ MAIS Code FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) - / - - / 446.231 - / / 463.580 - / / 544.086 - / - - / - / 443.965 - / - - / - / 2,561.131 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: In direct support of SecWar's direction to increase readiness across the DoW, efforts within this PEC will be prioritized based on the National Defense Authorization Act NDAA), USAF Force Design, Agile Combat Employment (ACE), and the Defense Planning Guide (DPG). These efforts will support work and collaboration efforts across the Combat Readiness Directorate in PE's 0708051F, 0701212F, 0702833F, 0604706F, 0605827F, 0202834F, 0502834F, 0502844F, 0208031F, 0401135F and 0207521F) -- to increase readiness across the Air Force Enterprise. The Aircraft Replacement Support Equipment program requires funding to procure replacement organizational and intermediate level support equipment for in and out-of-production aircraft. Common support equipment (used on more than one weapon system) directly supports aircraft maintenance, servicing, and sortie generation requirements. Replacing support equipment ensures continuation of serviceable, supportable equipment over the life of a weapon system and directly contributes to aircraft availability and mission readiness. Items requiring replacement typically range in age from 10 to 35 years old. As a result, this equipment suffers frequent failures, becomes uneconomical to repair, and requires spare parts that are no longer available. Many items have become technologically obsolete or must be replaced due to environmental operating constraints. Items of equipment budgeted within this program include (but are not limited to): avionics test stations, miscellaneous aerospace ground equipment, aircraft handling equipment, aircraft maintenance stands, flight line compressors, air conditioners and heaters, aerial stores lift trucks (jammers) and weapon loading adapters, ammunition loaders and munitions assembly conveyors, cryogenic equipment, small and large munitions trailers, flight line generators and secondary power systems, electronic test sets, propulsion support equipment, calibration, optical and ancillary testers, automatic test systems and multi-function /multi-capability equipment where it is suitable for the mission. These items support all Aircraft and numerous Air Force weapon systems. Failure to procure these items will negatively affect mission capable rates, increase maintenance costs, and impair USAF Aircraft generation timelines. Efforts with funding starting in FY 2028 through FY 2031 are summarized on the P-40. Not all details of this funding are included in this P-40 exhibit set. A summary of the excepted details is as follows: (a) (b) (c) (d) (e) LI 000071 - Aircraft Replacement Support Equip Air Force FY 2028 Cost Delta: 425.589 million FY 2029 Cost Delta: 453.359 million FY 2030 Cost Delta: 544.086 million FY 2031 Cost Delta: 443.965 million FY Total Cost Delta: 2,400.835 million UNCLASSIFIED Page 10 of 36 P-1 Line #71 Volume 1 - 156 === page 193 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000071 / Aircraft Replacement Support Equip Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: Aerial Stores Lift Trucks FY 2027 Base Total Cost Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Regional Base Cluster Pre-positioning (RBCP) Pacific Deterrence Initiative (PDI) A - - - - - - - - - - 0.000 AFNG - AFR - - AF - AFNG - AFR - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - - - - - 0.150 1 0.150 - - 1 0.150 - - - - - 0.150 - - - - - - 0.000 - 0.000 - 0.000 - 0.000 - - 0.000 - - 0.000 - 0.000 - 0.000 - 0.000 - - 0.000 - 0.000 - - 0.000 - - 0.000 - - 0.000 - - - - 0.000 - - - 0.000 - 0.000 - 0.000 - 0.000 - - - 0.150 1 0.150 - - 1 0.150 - - - - - 0.150 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Secondary Distribution AF Subtotal: Regional Base Cluster Prepositioning (RBCP) Hardware - Hardware End Item Cost MJ-1C A Secondary Distribution MHU-83 A - - - - - - Secondary Distribution Subtotal: Hardware - Hardware End Item Cost Support - Support End Item Cost PMA Other Government Charges A Secondary Distribution AF PMA: Other Contractor Services A - - - - - - Secondary Distribution AF Subtotal: Support - Support End Item Cost - - - - - 0.000 - - 0.000 - - - - - - - - - Total - - - - - - - - - - - 0.150 - - - - - 0.150 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: FY24 includes Ebbing Congressional Add FY24 includes Regional Base Cluster Pre-Positioning (RBCP) requirements to support Pacific Deterrence Initiative (PDI). Aircraft Replacement Support Equipment is centrally managed as a common platform and PMA costs are shared. This capability procures a multitude of related items with different unit costs. LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 11 of 36 P-1 Line #71 Volume 1 - 157 === page 194 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 1 P-1 Line Item Number / Title: 000071 / Aircraft Replacement Support Equip Aggregated Items Title: Aerial Stores Lift Trucks Exact quantities may vary based on real world requirements and priorities as established by the Major Commands. Deviations will be updated in the next budget cycle. LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 12 of 36 P-1 Line #71 Volume 1 - 158 === page 195 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000071 / Aircraft Replacement Support Equip Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: Aircraft Maintenance Secondary Power FY 2027 Base Total Cost Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Regional Base CLuster Pre-Positioning (RBCP) Pacific Deterrence Initiative (PDI) A - - - - - - - - - - - - - - - - - - - - 0.000 - - - 0.000 - - - 0.021 - - - - - - - - - - - - - - - - 50 1.047 0.022 50 1.047 0.061 15 0.920 15 0.920 - - 0.920 - - - - - - 400 8.835 0.023 400 8.835 - - - - - - - - - - - - - - 395 9.087 - 395 9.087 0.061 15 0.920 15 0.920 - - 0.920 - - - - - - - - - - - 0.023 395 9.087 - - 395 9.087 Secondary Distribution AF Subtotal: Regional Base CLuster Pre-Positioning (RBCP) Support - Support End Item Cost PMA Other GovernmentCosts A Subtotal: Support - Support End Item Cost Hardware - Hardware End Item Cost Secondary Power Unit A Secondary Distribution AF Subtotal: Hardware - Hardware End Item Cost - - - - - 1.047 - - 8.835 - - 9.087 - - - - - 9.087 Total - - - - - 1.047 - - 8.835 - - 10.007 - - - - - 10.007 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: This capability procures a multitude of related items with different unit costs. Exact quantities may vary based on real world requirements and priorities as established by the Major Commands. Deviations will be updated in the next budget cycle. KC-135 Congressional Add includes Secondary Power Equipment and Tools & IPE LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 13 of 36 P-1 Line #71 Volume 1 - 159 === page 196 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000071 / Aircraft Replacement Support Equip Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: Aircraft Maintenance Testers FY 2027 Base Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) Hardware - Hardware End Item Cost Pacific Initiative A Testers: Avionics, Radar, Radio A - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - 0.093 160 14.869 - - 0.093 160 14.869 AF - - - - - - 160 14.869 - - 160 14.869 AFR - - - 0.000 - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - - - - - - - - - - 14.869 - - - - - 14.869 - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - Subtotal: Support - Support End Item Cost - - 0.000 - - - - - - - - - - - - - - - Total - - - - - - - - - - - 14.869 - - - - - 14.869 Secondary Distribution AFR Optical Devices A - - - - Secondary Distribution Misc Electronic Devices A Subtotal: Hardware - Hardware End Item Cost Support - Support End Item Cost PMA: Other Contractor Services A PMA: Other Government Charges A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: Aircraft Replacement Support Equipment is centrally managed as a common platform and PMA costs are shared. This capability procures a multitude of related items with different unit costs. Exact quantities may vary based on real world requirements and priorities as established by the Major Commands. Deviations will be updated in the next budget cycle. FY24 funding increased to purchase additional aircraft maintenance testers for the Pacific theater. LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 14 of 36 P-1 Line #71 Volume 1 - 160 === page 197 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 1 P-1 Line Item Number / Title: 000071 / Aircraft Replacement Support Equip ID Code (A=Service Ready, B=Not Service Ready) : B Resource Summary Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) Modification Number / Title: 1 / MHU-196/204 SLEP MDAP/MAIS Code: Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete - - - - - - - - - - - 90.872 14.651 6.709 17.201 0.000 17.201 20.642 10.221 0.000 - - - - - - - - - - - - - 90.872 14.651 6.709 17.201 0.000 17.201 20.642 10.221 0.000 - - - - - - - - - - - - - 90.872 14.651 6.709 17.201 0.000 17.201 20.642 10.221 0.000 - - Total 160.296 160.296 160.296 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The legacy munitions handling units (MHU) program consists of the MHU-196/M and MHU-204/M. These MHUs are unsustainable due to parts obsolescence and are experiencing uncommand responses due to antiquated electronic and hydraulic systems as identified in the requirements documents (AF FORM 1067, modification proposals, AFGSC 18-090 and AFGSC 18-090). These MHUs will be replaced by the modified MHU-196B/M and MHU-204B/M units. This program will extend the service life by assessing the structural integrity and repairing the legacy control and power system. OO-ALC, is/may be expanding their facility production and investing in additional space, support equipment and manpower as part of modification facility activation. This modification also alleviates part obsolescence and addresses diminishing manufacturing sources. Total non-recurring cost are for the depot activation: facilities, support equipment, and other support as required. The munitions lift trailers have met and exceeded the original service life of 20 years, and this effort is to provide an additional 20 years of service. To support modification effort, PMA funding may be used for A&AS support, tech data validation/verification and program travel requirements. Group A kits are not required; all components parts are/will be stock listed, either by the Program Management Office, Defense Logistics Agency (DLA) and/or the Air Force Sustainment Center (AFSC). Assets are used in support of nuclear and conventional operations. Air Force Global Strike Command (AFGSC) requested a production time line of 8 years. In order to meet this, additional funding is required for depot activation. PMA Justification: The program team will use PMA to allow the USAF program office to assist in planning support needed to produce and install the modification, oversee the modification, evaluate engineering change proposals and help resolve technical issues. PMA will also support program mgt reviews (PMRs) to discuss production schedules, as well as current programmatic /technical issues and impacts to the program. Impact if PMA not funded: Increases programmatic risk to the USAF program office by not being able to provide program support to resolve cost, schedule or technical issues in a timely manner that could result in delays. Degradation of the modification program will directly affect operational safety, suitability and effectiveness of transporting and handling conventional and nuclear munitions. This affects the support of strategic, long range bombing throughout the world. Group B Non-recurring includes the Depot activation Costs for FY14-23. A larger facility (Bldg. 850) is required to accommodate the production required to satisfy AFGSC time line requirement of an 8 year program. It also includes the contract issues by the depot production process and technical documentation requirements. Group B kits represent MHU inducted by the depot for SLEP. Group A kits are not required; all components parts are/will be stock listed, either by the Program Management Office, Defense Logistics Agency (DLA) and/or the Air Force Sustainment Center (AFSC). Total Non-recurring cost are for the depot activation: facilities, support equipment, and other support as required. Impact if not funded: The program would cease to exist. Alternate sources for production would need to be acquired which will delay any SLEP production for at least 12-18 months. LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 15 of 36 P-1 Line #71 Volume 1 - 161 === page 198 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 1 P-1 Line Item Number / Title: 000071 / Aircraft Replacement Support Equip ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: 1 / MHU-196/204 SLEP MDAP/MAIS Code: Other Government Cost includes: Testing required for Nuclear Certification and unknown miscellaneous support/expenses associated with the Nuclear Certification. Impact if Other Government Cost not funded: Since the MLT/MHU(Munitions Lift Trailer/Munitions Handling Unit) is required to be nuclear certified, the lack of funding would gravely degraded the capability of the MHU mission because MHU production could not be fielded without nuclear certification. Milestone/Development Status Studies have been accomplished providing necessary technical data to extend the service life of the fleet to meet mission needs. These studies addressed obsolescence and component level repair and sustainment issues. The depot has disassembled/reassembled two legacy trailer, allowing them to create the production control documents and processes required to produce the final SLEP trailers. Secondary Distribution AF Quantity Total Obligation Authority Total: Secondary Distribution Quantity Total Obligation Authority LI 000071 - Aircraft Replacement Support Equip Air Force FY 2025 FY 2027 Base FY 2026 FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 - - - - - - - - - 14.651 6.709 17.201 - 17.201 20.642 10.221 - - - - - - - - - - - 14.651 6.709 17.201 0.000 17.201 20.642 10.221 0.000 - UNCLASSIFIED Page 16 of 36 P-1 Line #71 Volume 1 - 162 === page 199 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 000071 / Aircraft Replacement Support Equip Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 1 ID Code (A=Service Ready, B=Not Service Ready) : B MDAP/MAIS Code: Models of Systems Affected: MHU-196, 204 Modification Type: Service Life Extension Prior Years Financial Plan Modification Number / Title: 1 / MHU-196/204 SLEP FY 2025 FY 2026 FY 2027 Base FY 2027 OOC Related RDT&E PEs: FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Qty (Each) / Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Total Cost ($ M) Procurement Modification Item 1 of 1: Hardware MLT Mod Kit B Kits Recurring Hardware MLT Mod Kit:EQUIPMENT Group B (Active) Subtotal: Recurring Subtotal: Hardware MLT Mod Kit Subtotal: Procurement, All Modification Items 145 / 49.059 43 / 17.201 - / - 43 / 17.201 21 / 20.642 - / 10.221 - / - - / - - / - 513 / 118.483 - / 49.059 130 / 14.651 - / 14.651 174 / 6.709 - / 6.709 - / 17.201 - / - - / 17.201 - / 20.642 - / 10.221 - / - - / - - / - - / 118.483 - / 49.059 - / 14.651 - / 6.709 - / 17.201 - / - - / 17.201 - / 20.642 - / 10.221 - / - - / - - / - - / 118.483 - / 49.059 - / 14.651 - / 6.709 - / 17.201 - / - - / 17.201 - / 20.642 - / 10.221 - / - - / - - / - - / 118.483 Support (All Modification Items) GROUP A: TOTAL NONRECURRING GROUP B: TOTAL NONRECURRING - / 7.573 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - / 28.435 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 7.573 / 28.435 SUPPORT-EQUIP - / 2.724 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 2.724 PMA - Other Gov't Costs - / 1.171 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 1.171 OTHER GOVT - / 1.910 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / 41.813 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - Subtotal: Support - / 1.910 / 41.813 Installation Modification Item 1 of 1: Hardware MLT Mod Kit 145 / 0.000 130 / 0.000 174 / 0.000 43 / 0.000 - / - 43 / 0.000 21 / 0.000 - / - - / - - / - - / - 513 / 0.000 Subtotal: Installation 145 / 0.000 130 / 0.000 174 / 0.000 43 / 0.000 - / - 43 / 0.000 21 / - - / - - / - - / - - / - 513 / 0.000 90.872 14.651 6.709 17.201 0.000 17.201 - 160.296 Total Total Cost (Procurement + Support + Installation) LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 17 of 36 20.642 10.221 P-1 Line #71 0.000 - Volume 1 - 163 === page 200 === UNCLASSIFIED Date: April 2026 Exhibit P-3a, Individual Modification: PB 2027 Air Force P-1 Line Item Number / Title: 000071 / Aircraft Replacement Support Equip Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 1 ID Code (A=Service Ready, B=Not Service Ready) : B Modification Number / Title: 1 / MHU-196/204 SLEP MDAP/MAIS Code: Modification Item 1 of 1: Hardware MLT Mod Kit Manufacturer Information Manufacturer Name: Depot/ALC Manufacturer Location: Hill AFB, Utah Administrative Leadtime (in Months): 2 Production Leadtime (in Months): 4 Dates FY 2025 FY 2026 FY 2027 FY 2028 Contract Dates Apr 2025 Apr 2026 Apr 2027 Apr 2028 Delivery Dates Aug 2025 Aug 2026 Aug 2027 Aug 2028 FY 2029 FY 2030 FY 2031 Installation Information Method of Implementation: Depot Installation Cost Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 FY 2031 To Complete Total Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) Qty (Each) / Total Cost ($ M) - - / - - / - - / - - / - - / - - / - - / - - / - - / - 145 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - - / - 130 / 0.000 - / - - / - - / - - / - - / - - / - - / - - / - 174 / 0.000 43 / 0.000 - / - 43 / 0.000 - / - - / - - / - - / - - / - 43 / 0.000 21 / 0.000 - / - - / - - / - - / - 21 / 0.000 Prior Years 145 / 0.000 / - FY 2025 - / - FY 2026 - / - - / - FY 2027 - / - - / - - / - FY 2028 - / - - / - - / - - / - - / - - / - FY 2029 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2030 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - FY 2031 - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - To Complete - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - - / - 43 / 0.000 - / - 21 / 0.000 - / - - / - - / - - / - Total 130 / 0.000 145 / 0.000 174 / 0.000 130 / 0.000 174 / 0.000 43 / 0.000 513 / 0.000 Installation Schedule FY 2025 FY 2026 FY 2027 FY 2028 FY 2029 FY 2030 FY 2031 PYS Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 TC Tot In 145 32 33 32 33 43 44 43 44 11 11 11 10 11 10 0 0 - - - - - - - - - - - - 0 513 Out 145 32 33 32 33 43 44 43 44 11 11 11 10 11 10 0 0 - - - - - - - - - - - - 0 513 LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 18 of 36 P-1 Line #71 Volume 1 - 164 === page 201 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000071 / Aircraft Replacement Support Equip Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Ammunition Loading Equipment Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Support - Support End Item Cost PMA, Data rights A - - - 0.020 1 0.020 1 0.020 0.020 - - - - - - - 0.020 - - - - 0.596 15 8.944 0.594 - - - - 1 0.020 1 0.020 - - - - - - - 5 3.074 5 3.074 - - - - - - - - - - - - - 0.615 - - - - - - - - - - Secondary Distribution AF Subtotal: Support - Support End Item Cost - 0.020 - 5 2.970 0.615 5 2.970 Hardware - Ammo Loaders Ammo Loaders A 5 3.074 5 3.074 Secondary Distribution AF European Defense Initiative (EDI) A - 15 8.944 0.606 15 9.088 - - - - - - - - - - Secondary Distribution - - 15 9.088 - - - - - - - - Subtotal: Hardware - Ammo Loaders AF - - - - - 18.032 - - 2.970 - - 3.074 - - - - - 3.074 Total - - - - - 18.052 - - 2.990 - - 3.074 - - - - - 3.074 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: Aircraft Replacement Support Equipment is centrally managed as a common platform and PMA costs are shared. At least 8 different major NSN/components are tracked for procurement and each command (Active, Guard, Reserve) require different number of the different major NSN/components. Thus, the unit cost is a weighted average of the various units for the FY. LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 19 of 36 P-1 Line #71 Volume 1 - 165 === page 202 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000071 / Aircraft Replacement Support Equip Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: ATS - Base Maint and Spt Eq ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Automatic Test Systems (ATS) Base Maintenance and Support Equipment Avionics A - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.501 1 0.501 1 0.501 1 0.501 1 0.501 1 2.206 1 2.206 1 0.250 1 0.250 1 13.965 1 13.965 1 1.251 1 1.251 1 0.250 1 0.250 1 0.060 0.050 1 0.050 1 0.050 1 0.085 1 0.085 1 3.402 1 3.402 1 0.250 1 0.250 1 1.110 1 1.110 1 0.555 1 0.555 1 0.250 1 0.250 1 0.068 1 0.068 1 9.749 1 9.749 0.078 1 0.078 1 0.078 1 0.080 1 0.080 1 3.476 1 3.476 1 0.250 1 0.250 1 1.180 1 1.180 1 0.551 1 0.551 1 0.250 1 0.250 1 0.069 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.078 1 0.078 1 0.078 1 0.080 1 0.080 1 3.476 1 3.476 1 0.250 1 0.250 1 1.180 1 1.180 1 0.551 1 0.551 1 0.250 1 0.250 1 0.069 Secondary Distribution AF Software Loader/ Verifier and Built-inTest ATS A - 0.501 0.085 0.080 - 0.080 Secondary Distribution AF Radar and Identification Friend or Foe ATS A - 2.206 3.402 3.476 - 3.476 Secondary Distribution AF Cyber Security/ Support A - 0.250 0.250 0.250 - 0.250 Secondary Distribution AF Armament and Stores ATS A - 13.965 1.110 1.180 - 1.180 Secondary Distribution AF Electronic Warfare ATS A - 1.251 0.555 0.551 - 0.551 Secondary Distribution AF PMA OTHER GOVERNMENT COSTS A - 0.250 0.250 0.250 - 0.250 Secondary Distribution AF Specialized ATS A - 0.060 0.068 0.069 - 0.069 Secondary Distribution AF ATS Innovation/Digital Transformation A - 11.360 1 0.060 1 11.360 1 11.360 9.749 17.744 1 0.069 1 17.744 1 17.744 - 17.744 1 0.069 1 17.744 1 17.744 Secondary Distribution AF Subtotal: Automatic Test Systems (ATS) Base Maintenance and Support Equipment - LI 000071 - Aircraft Replacement Support Equip Air Force - - 30.344 - - 15.519 UNCLASSIFIED Page 20 of 36 - - 23.678 P-1 Line #71 - - - 23.678 Volume 1 - 166 === page 203 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000071 / Aircraft Replacement Support Equip Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] Total ID CD MAIS Code Unit Cost ($ M) - Qty (Each) FY 2025 Total Cost Unit Cost ($ M) - ($ M) - - Qty (Each) - FY 2026 Total Cost ($ M) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. 30.344 Unit Cost ($ M) - Qty (Each) Aggregated Items Title: ATS - Base Maint and Spt Eq FY 2027 Base Total Cost ($ M) - 15.519 Unit Cost ($ M) - Qty (Each) - FY 2027 OOC Total Cost ($ M) Unit Cost ($ M) 23.678 - Qty (Each) - FY 2027 Total Total Cost Unit Cost ($ M) ($ M) - - Qty (Each) Total Cost ($ M) - 23.678 Remarks: The Automatic Test System (ATS) program office, develops, modernizes, upgrades and sustains ATS and Automated Test Equipment (ATE) for Joint Force & Major Commands. ATS is required to generate ALL nuclear & conventional sorties across ALL Air Force core competencies to meet Combatant Command mission requirements - modernizing ATS guarantees the readiness and lethality of the Joint Force. Modernization of 8K+ testers across ALL Major Commands & Joint Force will help accelerate the fielding of cyber-resilient, nuclear-certified ATS to develop, field, and sustain the next generation of platforms; Next Generation Air Dominance (NGAD), 5th-gen aircraft, F-15EX, "Sentinel Ground Based Strategic Deterrent (GBSD), B-21, KC-46. FY26-27 procurement dollars provides funding for procurement of replacement support equipment for out-of-production aircraft. Includes common (used on more than one weapon system) and peculiar (unique to one weapon system), which directly support aircraft maintenance and servicing requirements. Funding will also be utilized for the ATS Program Office in support of the purchase/upgrades of Armament Test Sets, purchase of Common Cargo ATS, hardware, TPS and other support to ensure cyber secure Automatic Test Systems and costs associated with Common items (used on more than one weapon system) and peculiar items (unique to one weapon system) automated test equipment for the Automatic Test Systems Division. The ATS Product Group which consists of: Armament and Stores ATS, Electronic Warfare ATS, Software Loader/Verifier and Built-in-Test ATS, Radar and Identification Friend or Foe ATS, Specialized ATS to accelerate replacing and fielding cyber-resilient, nuclear-certified ATS supporting USAF Armament, Bomber, Fighter/Advance Aircraft, Mobility, Training, ISR & SOF, Presidential & Executive Airlift ATS. These replacement items ensure continuation of serviceable equipment over the life of a weapon system. Items for procurement include, but are not limited to, test adapter kits, transponder test sets, Portable Automatic Test Sets, Radar Signal Simulators (RSS), logistics under attack cyber efforts, digital test stations, automated wire test sets, propulsion automatic test equipment, automatic test equipment calibration, smart weapons test sets, optical and ancillary testers, Commercial Off the Shelf (COTS) Automatic Test Equipment (ATE). PMA Other Government Costs applies to travel in relation to multiple platforms to include, but are not limited to F-16, B-52, B-1, B-2, F-15, A-10, cyber support, and other government costs in support of Automatic Test Systems programs and the Automatic Test System program office. Programs include, but are not limited to, ATS Standardization, Portable Automatic Test Sets (PATS), Identification Friend or Foe-Radar Test Set (IFF-RTS), Electrical Electronics Equipment Test Station (EEETS),Common Organizational Level Tester (COLT), Armament Test Sets (ATS), Automated Wiring Test Set (AWTS), Electronic Warfare (EW) Chaff/Flare, Radar Signal Simulator (RSS)(AN/PLM-4), Radio Frequency Transmission Line Test Set (RFTLTS), Benchtop Reprogrammable Test System (BRAT), Helmet Cueing System Automatic Test Equipment (HCS-ATE)Commercial Off the Shelf (COTS) Automatic Test Equipment (ATE). FY24 THRU FY26 Funding moved here from P-40a ATS -Test Measurements Diagnostic Equipment (TMDE-Electronic)for Active Duty PEC 0701212F only also known as (Commercial Off The Shelf ATE-COTS ATE), Bomber Armament Tester, B-52 Multi-User Systems Tester Armament Next Generation (MUSTANG), Common Aircraft Portable Reprogramming Equipment (CAPRE) Joint Service Electronic Combat Systems Tester (JSECST) and Aircraft Smart Weapons Test Set (ASWTS). FY25 -FY26 funding moved from the P-5 budget exhibit of the B-1B Advanced REW Test Station (ARTS). Funds are required to modernize, upgrade, and sustain Automated Test Systems (ATS) for Joint Force & Major Commands. ATS is required to generate ALL nuclear & conventional sorties across ALL Air Force core competencies to meet Combatant Command mission requirements. Failure in the ATS portfolio will ground aircraft (and/or weapons) due to an inability to troubleshoot, repair, and sustain critical components required for flight. Without ATS and its family of testers, there are no ready and reliable aircraft to execute the ACE scheme of maneuver or to defend the homeland. Automatic Test Systems (ATS) Program Office re-structured portfolio to facilitate enterprise management of ATS; poised to support Resilient Basing, Persistent Logistics, and Agile Combat Employment. The will allow the program office to support multiple weapon systems; drive to common solutions ensuring interoperability and accelerate digital transformation; focused on delivering ATS relevant in High End fight. The division achieved IOC for its new structure and changes to how it conducts business effective 24 Jan 22. Furthermore, the AF Program Executive Officer for Agile Combat Support approved the realignment of the ATS portfolio structure via an Acquisition Decision Memorandum (ADM) on 3 Feb 22. The 7 Product Management Groups are: ATS Innovation/Digital Transformation Armament & Stores ATS Avionics ATS Electronic Warfare ATS Software Loader/Verifier & Built In Test ATS Radar and Identification Friend or Foe ATS (Radar and IFF ATS) Specialized ATS ATS - Base Maintenance and Support Equipment (ATS) ATS - Base Maintenance and Support Equipment procurement dollars will be used in support of the purchase /upgrades of Armament Test Sets, purchase of Common Cargo ATS, hardware, TPS and other support to ensure cyber secure Automatic Test Systems and costs associated with Common items (used on more than one weapon system) and peculiar items (unique to one weapon system) automated test equipment for the Automatic Test Systems Division. These LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 21 of 36 P-1 Line #71 Volume 1 - 167 === page 204 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 1 P-1 Line Item Number / Title: 000071 / Aircraft Replacement Support Equip Aggregated Items Title: ATS - Base Maint and Spt Eq replacement items ensure continuation of serviceable equipment over the life of a weapon system. Items for procurement include, but are not limited to, test adapter kits, transponder test sets, Portable Automatic Test Sets, Radar Signal Simulators (RSS), logistics under attack cyber efforts, digital test stations, automated wire test sets, propulsion automatic test equipment, automatic test equipment calibration, smart weapons test sets, optical and ancillary testers, Commercial Off the Shelf (COTS) Automatic Test Equipment (ATE). Funds will also be utilized for procurement of replacement support equipment for out-of-production aircraft. Includes common (used on more than one weapon system) and peculiar (unique to one weapon system), which directly support aircraft maintenance and servicing requirements. The ATS program office re-structured its portfolio into seven capabilities/groups to facilitate enterprise management of ATS; operational flexibility and agility required... to launch decisive operations against targets anywhere in the world, including directly from the U.S. Homeland. ATS supports multiple weapon systems; drive to common solutions ensuring interoperability. ATS continues to accelerate digital transformation; focused on delivering ATS relevant in High End fight. The seven capability groups are: ATS Innovation/Digital Transformation - This program is the only path to fielding the test solutions required for the Air Force's next-generation platforms (NGAD, B-21, Sentinel) and the core strategic goal of achieving operational flexibility and agility. ATS delivers this capability by executing the AF Digital Strategy—using Model-Based Systems Engineering (MBSE), Digital Twins, and MOSA; to significantly reduce development timelines from years to months. This ensures test solutions evolve at the speed of software, keeping pace with agile adversaries. Efforts like the Common Aircraft Tester - Fighter (CAT-F) program, which consolidates multiple legacy testers into a single, flexible platform, significantly reduces the logistics footprint and lifecycle costs. Armament & Stores ATS - This program delivers the foundational test capability that ensures the readiness, lethality, range, and survivability of the Joint Force. Fields common systems like the Common Organizational Level Tester (COLT) for conventional readiness and, more critically, sustains the highly specialized, nuclear-certified testers that guarantee a secure and effective nuclear arsenal for platforms like the B-52, B-2, and F-22. The Armament ATS program provides test capability to ensure the aircrafts weapon release system is working properly. The Program consists of the B-2/F-22 Common Organizational Level Tester, B-52/AGM-86 Cruise Missile Automatic Test System & B-2 Electronic System Test Station (ESTS-C), F-15 Armament Testers (T-197, T-198, T-199), F-15 Aircraft Pod Interface Test Set (APITS), F-16 Stores System Tester (SST) & Armament Circuits Pre-load Test Set (ACPTS), B-52 Multi-use System Tester Armament Next Generation (MUSTANG). The COLT ensures the weapons release systems are working properly (B-2 Rotary Launch Assembly, Smart Bomb Rack Assembly, Massive Ordinance Penetrator rack & the F-22 pylons, bomb racks, aircraft stores management system). The CM-ATS verifies the functions of the AGM-86 Cruise Missile navigation systems, the SUU-72 pylon, and for the B-2 RLA, SBRA, and MOP shop replaceable units. The F-15 Armament Testers certifies the aircrafts stores management systems, missile launchers, bomb racks and pylons. The F-15 T-199 verifies the aircraft is safe to load weapons. The APITS tests the ASQ-236 reconnaissance POD and the Data Link System. The F-16 SST certifies the aircrafts stores management systems, missile launchers, bomb racks and pylons. The F-16 ACPTS verifies the aircraft is safe to load weapons. The B-52 MUSTANG certifies the aircrafts stores management systems, bomb racks and pylons. Avionics ATS - This program confronts a significant readiness risk detrimental to the Department's ability to supercharge the U.S. Defense Industrial Base. 72% of the Avionics ATS inventory is operating beyond its 32-year average service life. This is an active, ongoing failure of the DIB's foundational layer, driven by unsustainable Diminishing Manufacturing Sources (DMSMS) that makes core test infrastructure unsupportable. B-1B ADTS: A level tester that is designed as a replacement for the Digital and Analog Video test stations. It is used to test and diagnose LRUs of the B-1 defensive systems that are used in the depot and backshop facilities. It is currently in the operations and support lifecycle phase. B-1B EPCAT: A level tester that provides maintenance capabilities used to test and diagnose potential issues and faults of the B-1Bs Shop Replacement Units (SRU), or LRUs. It is currently in the operations and support lifecycle phase. B-1B IATE: A level tester that tests LRUs and provides diagnostic capabilities for the Defense Avionics Systems. It is currently in the operations and support lifecycle phase. BRAT: A common radio frequency and connector tester that provides basic testing capabilities for analog, digital, and radio-frequency electronics. It supports multiple platforms such as the A-10, F-15 and C-5. It is currently in the operation and support lifecycle phase. F-15 AFCSTS: A system that performs maintenance and testing for F-15 flight control systems, while isolating defective aircraft LRUs. It is currently in the operation and support lifecycle phase. F-15 AIS: Maintenance equipment that provides diagnostic capabilities for F-15 radar systems. It is currently in the operation and support lifecycle phase. F-15 ESTS: A level tester designed to test F-15 avionics LRUs for faults, while providing additional diagnostic capabilities. It is currently in the operation and support lifecycle phase. F-16 MBFI: A diagnostic tool that is designed to troubleshoot multiplex 1553 communication, isolate faults within matrix assemblies, and remedy broken wires and/or pins. It is currently in the sustainment lifecycle phase. VDATS: An Air Force family of avionics core testers that is designed for depot testing capabilities and is an organically developed effort. It is currently in the sustainment lifecycle phase. Electronic Warfare ATS - The electromagnetic spectrum is a dynamic, contested battlespace. Adversaries are fielding adaptive, cognitive EW systems that our legacy testers cannot simulate. This creates a critical and unknown survivability gap for every pilot entering contested airspace. Modern EW suites are defined by their software Mission Data Files (MDFs). This program provides the only capability to validate these MDFs against modern, agile threats. Without this validation, a pilot cannot trust that their aircraft's defensive systems will function, leaving them vulnerable. The program consists of the Joint Services Electronic Combat Systems Tester (JSECST), the Electronic Warfare Chaff/Flare (ALM-288), the Countermeasures Test Set (USM-646A) and the B-1B Enhanced Automated Special Test Equipment (B-1B EASTE). JSECST (USM-670A) provides end-to-end EW systems functional testing capability. Automatically/Manually determines the Go/No-Go status of an Electronic Combat (EC) system installed in or on operation aircraft with minimal technician interaction. Electronic Warfare (EW) Chaff/Flare checks operation of EW Chaff and Flare dispensers. Countermeasures Test Set (CTS) USM-464A is a peculiar B-52 tester program that provides testing of aircraft Electronic Combat (EC) systems to provide Go/No-Go and end-to-end performance verification testing of the EC system. B-1B EASTE is an operational level tester that provides end-to-end testing on B-1B AN/ALQ-161 Defensive Avionics System. Software Loader/Verifier & BIT ATS - This portfolio is the secure gateway for loading the software, mission data, and flight programs that define a weapon system's modern capabilities. It is the essential link that enables the software-defined weapon and is a non-negotiable requirement for mission success across the Joint Force. The ability to securely reprogram weapon systems at the point of need is fundamental to achieving operational flexibility and agility. Without this capability, Air Forces cannot adapt at speed, leaving them slow, predictable, and critically vulnerable in a contested environment. The program consists of the Common Aircraft Portable Reprogramming Equipment (CAPRE), F-16 Viper peculiar loader/multi-bus fault indicator (MBFI), common munitions BIT reprogramming equipment (CMBRE) test systems, and service life extension project for the CMBRE system. CAPRE reprograms aircraft computer software, updates threat data in electronic warfare pods, performs aircraft diagnostic troubleshooting, and supports automated technical orders. CAPRE consists of a mobile maintenance terminal, cables, interface modules, software, and Aircraft Adapter Groups (AAGs). Critical to CAPRE are the AAGs. AAGs connect CAPRE laptops, test equipment, and Line Replaceable Units (LRU) on support weapon systems. The F-16 Viper/MBFI provides data exchange and diagnostic capabilities to all blocks of F-16 aircraft. The Viper consists of a ruggedized laptop, interface adapter, and cables. The CMBRE is a munitions tester that provides BIT status; uploads/downloads and verifies software, including Operational Flight Programs (OFP), mission planning data, and/or Global Positioning System (GPS) crypto keys. The CMBRE consists of a ruggedized laptop Digital Computer Assembly (DCA); a Test Adapter Unit (TAU); a switch box and individualized cables for connection to weapons. A SLEP is in work for the 20-year-old CMBRE to address severe obsolescence and DMSMS issues, LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 22 of 36 P-1 Line #71 Volume 1 - 168 === page 205 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 1 P-1 Line Item Number / Title: 000071 / Aircraft Replacement Support Equip Aggregated Items Title: ATS - Base Maint and Spt Eq Radar and IFF ATS - A DoW-wide mandate to transition to encrypted Mode 5/S makes modernization an absolute imperative. This is the foundation for preventing fratricide and ensuring combat identification in a contested environment. The Gap: Our legacy testers cannot certify these secure formats, creating a critical and unacceptable risk to the force. In a dispersed operation, the inability to certify Combat ID at the point of need with a modern, portable tester creates a potentially fatal mission risk. Our forces must have this organic capability to survive and win. The program consists of the Identification Friend or Foe testers, Radar Test Set (IFF-RTS) (TS-4530/UPM), the Radar Signal Simulator (AN/ PLM-4), the Radio Frequency Transmission Line Test Set (RFTLTS), the B-52 Radar Test Set (RTS) AN/UPM-440), and the Electrical Electronic Equipment Test Set (EEETS). B-1B ARTS replaces the legacy ATS used to test ALQ-161 Defensive Avionics System (DAS) on the B-1B. TS-4530/UPM provides test capability of the IFF systems for all United States Air Force aircraft prior to flight. PLM-4 Radar Signal Simulator (RSS) provides flight line confidence check of Electronic Combat Systems. RFTLTS provides automatic testing and fault isolation of coaxial and waveguide transmission systems and components. B-52 RTS provides maintenance testing for the B-52 Strategic Radar and Offensive Avionics Systems. EEETS is used to diagnose and isolate faults/failures on APQ-170/APQ-180 Radars, Mission Computers, AIC-38/40 Communication Systems and AC-130U Displays Specialized ATS - Delivers unique test solutions for mission-essential systems (e.g., Helmet Mounted Cueing) that are not supported by common platforms. Without these, entire weapon systems are grounded, creating unacceptable gaps in force structure. Incorporates OSW Special Interest Item Electronic Intermittent Fault Detection (EIFD) as an ATS Program of Record to combat 10B DoW annual intermittent fault incidents and lead AF solution. Fields the calibration systems (e.g., Portable Automatic Test Equipment Calibrator (PATEC)) that serve as the "source of truth" for the entire test enterprise. The accuracy of every other tester, from depot to flight line, depends on the integrity of this foundation. The Program includes but not limited to, Portable Automatic Test Calibration Equipment (PATEC) , Automatic Wire Test Set (AWTS), F-15 Suitcase tester, Test Measurement Diagnostic Equipment (TMDE), Helmet Cuing System ATE (HCSATE), B-1B O-Level ATS, B-1B Oil Cooling Cart, Common Cargo, Depot Hydraulics/ Pneudraulic, and Mature Proven A/C ATS. PATEC is a portable calibration test system capable of calibrating over 40 different automatic test stations used on multiple weapon systems. AWTS Ensures critical testing for organizational, back shop and depot level resolution of wiring/component anomalies to support aircraft missions. Common cargo consists of 300+ pieces of equipment managed at the End Item level, used on aircraft, to validate suspected failed components by performing troubleshooting and go/no-go functions. The HCS-ATE provides ability to check proper operation of helmet mounted devices. PMA Other Government Costs applies to travel in relation to multiple platforms to include, but are not limited to F-16, B-52, B-1, B-2, F-15, A-10, cyber support, and other government costs in support of Automatic Test Systems programs and the Automatic Test System program office. Programs include, but are not limited to, ATS Standardization, Portable Automatic Test Sets (PATS), Identification Friend or Foe-Radar Test Set (IFF-RTS), Electrical Electronics Equipment Test Station (EEETS),Common Organizational Level Tester (COLT), Armament Test Sets (ATS), Automated Wiring Test Set (AWTS), Electronic Warfare (EW) Chaff /Flare, Radar Signal Simulator (RSS)(AN /PLM-4), Radio Frequency Transmission Line Test Set (RFTLTS), Benchtop Reprogrammable Test System (BRAT), Helmet Cueing System Automatic Test Equipment (HCS-ATE)Commercial Off the Shelf (COTS) Automatic Test Equipment (ATE). In direct support of SecWar's direction to increase readiness across the DoW, efforts within this PEC will be prioritized based on the National Defense Authorization Act (NDAA), USAF Force Design, Agile Combat Employment (ACE), and the Defense Planning Guide (DPG) These efforts will support work and collaboration efforts across the Combat Readiness Directorate in PE's 0708051F, 0701212F, 0702833F, 0604706F, 0605827F, 0202834F, 0502834F, 0502844F, 0208031F, 0401135F and 0207521F) -- to increase readiness across the Air Force Enterprise LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 23 of 36 P-1 Line #71 Volume 1 - 169 === page 206 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000071 / Aircraft Replacement Support Equip Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2026 Total Cost ($ M) Unit Cost ($ M) Qty (Each) Aggregated Items Title: ATS TMDE-Electronic FY 2027 Base Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) TMDE-COTS ATE TMDE A - - - AF - AFNG - - - 4.166 - - - - - - 4.222 - - 0.000 - 0.000 - 2.499 - 2.532 - 4.318 - - - - - 4.318 - - - - - 2.590 - - - 2.590 Secondary Distribution - - - 1.667 - 1.690 - 1.728 - - - 1.728 Subtotal: TMDE-COTS ATE AFR - - - - - 4.166 - - 4.222 - - 4.318 - - - - - 4.318 Total - - - - - 4.166 - - 4.222 - - 4.318 - - - - - 4.318 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: This budget exhibit is for funding for the TMDE - COTS ATE program for Air National Guard (0502844F) and Air Force Reserve Command(0502824F). This exhibit is managed by the Automatic Test Systems Division. FY25 thru FY27 funding for Active TMDE - COTS ATE (0701212F) has been moved to the ATS - Base Maintenance and Support Equipment budget exhibit which is in the Specialized ATS IPT within the Automatic Test Systems Division. Commercial Off The Shelf Automatic Test Equipment (COTS ATE) TMDE supports 5 programs : TMDE Analyzer, TMDE Calibrators, TMDE Generic, TMDE Meters, and TMDE Test Sets and is in the Specialized Automatic Test Systems capability bucket. The Specialized ATS fills critical gaps by delivering unique test solutions for mission-essential systems (e.g., Helmet Mounted Cueing) that are not supported by common platforms. Without these, entire weapon systems are grounded. Items that are made up of generic Commercial Off the Shelf Automatic Test Equipment (COTS-ATE). These items range from man portable/bench-top equipment which provide measurement capabilities to instruments that check measures against an accurate standard to determine any deviation. Items include length gauges, depth gauges, bore gauges, calipers, chemical composition devices, and other devices Various devices designed to measure time, distance, speed, or intensity or indicate and record or regulate the amount or volume, as of the flow of a gas, resistance, power, mechanical properties, conductivity, material composition, optical investigation or an electric current such as flow meters, microscopes, current meters, voltage meters, ohm meters, bridges, non-destructive testing and others. TMDE analyzers are devices that investigate the physical or electrical factors of an item under test. The major types of analyzers are bus, logic, network, spectrum and vector signal. Program provides for replacement buys, organic including inter-service and contract repair for all Department of War military branches, Foreign Military Sales (FMS) and other agencies. Instruments designed for a specific type of measurement to validate the performance of radios, RADAR, navigation, avionics, telephone, data, circuit cards and other items that have multiple parameters that must be verified to ensure optimum performance and mission accomplishment which may be computer controlled or may be manually operated. FY26-27 funds will be utilized to procure common automatic test/support equipment items, Program Management Administration (PMA), and other government associated costs in support of installation and unit mission requirements for Air Force personnel. In direct support of SecWar's direction to increase readiness across the DoW, efforts within this PEC will be prioritized based on the National Defense Authorization Act (NDAA), USAF Force Design, Agile Combat Employment (ACE), and the Defense Planning Guide (DPG) These efforts will support work and collaboration efforts across the Combat Readiness Directorate in PE's (0708051F, 0701212F, 0702833F, 0604706F, 0605827F, 0202834F, 0502834F, 0502844F, 20208031F, 0401135F and 0207521F) -to increase readiness across the Air Force Enterprise LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 24 of 36 P-1 Line #71 Volume 1 - 170 === page 207 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000071 / Aircraft Replacement Support Equip Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: BP12 ITEMS LESS THAN 5 MILLION DOLLARS FY 2027 Base Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) SUPPORT EQUIPMENT AND VEHICLES (SEV) SE&V Base Maint & Spt Equipment A - - - - - - - - - - - 0.000 - - - - - 0.000 - 0.000 - - - - - - - 0.000 - - - 0.000 - - - 0.000 - - - - - - - - - - - - - - - - - - - - - - - - 0.000 - - - 0.000 - - - 0.000 - - - - - 30.229 - 30.229 - 0.180 - 0.180 - - - - - - - - - - - - - - - - - - - - - 0.000 - - - 0.000 - - - 0.000 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.000 - - 30.229 - 30.229 - 0.180 - 0.180 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - Secondary Distribution AF SE&V Base Main & Spt Equipment (PI) A - - - - - - Secondary Distribution AF FAST CHARACTERIZATION TOOL (FACT) 4920015711970RN (SEV) A FAST CHARACTERIZATION TOOL (FACT) 4920015654320RN (SEV) A FLIGHT LINE GENERATORS (SEV) A B-1 MAINTENANCE STANDS 1730015544187RN (SEV) A B-4 MAINTENANCE STANDS 1730015554366RN (SEV) A A/M24T-16 LOAD BANK (SEV) A MISCELLANEOUS AGE A PMA CONTRACTOR SERVICES A PMA OTHER GOVERNMENT COSTS (SEV) A ADVANCED CONTROL TESTER (ACT) (SEV) A RQ-4 Polyalphaolefin (PAO) cooling cart A Secondary Distribution LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 25 of 36 P-1 Line #71 Volume 1 - 171 === page 208 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000071 / Aircraft Replacement Support Equip Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) AF Subtotal: SUPPORT EQUIPMENT AND VEHICLES (SEV) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) - - - - - - - - Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($ M) - 0.000 - - 0.000 0.000 - - - 0.000 - - - 0.000 - - - Qty (Each) Aggregated Items Title: BP12 ITEMS LESS THAN 5 MILLION DOLLARS FY 2027 Base Total Cost Unit Cost ($ M) ($ M) - 0.000 - - 0.000 - - - - - - - - - 0.000 - - - 0.000 - - - 0.000 - - - Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ M) - - - - 30.409 - - - - - - - - - - - - - - - - - - 0.000 - - - 0.000 - - - 0.000 - - 0.000 Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Qty (Each) Total Cost ($ M) - - - - 30.409 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - AIR FORCE SUSTAINMENT CENTER (OC-ALC) FSC 1660 AIRCRAFT AIR CONDITIONING, HEAT AND PRESSURIZING EQUIPMENT (OC) A FSC 1730 AIRCRAFT GROUND SERVICING EQUIPMENT (OC) A FSC 3940 BLOCK, TACKLE, RIGGING, SLING (OC) A FSC 3990 MISCELLANEOUS MATERIALS HANDLING EQUIPMENT (OC) A FSC 4920 AIRCRAFT MAINT SHOP SPECIALIZED EQP (OC) A FSC 4935 GUIDED MISSILE MAINTENANCE, REP, AND CHECKOUT SPECIALIZED EQUIPMENT (OC) A FSC 5120 HAND TOOLS, NONEDGED, NONPOWERED (OC) A FSC 5130 HAND TOOLS, POWER DRIVE (OC) A FSC 5180 SPECIALIZED EQUIPMENTS, KITS, OUTFITS/HAND TOOLS (OC) A FSC 6625 ELECTRICAL AND ELECTRONIC PROPERTIES A LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 26 of 36 P-1 Line #71 Volume 1 - 172 === page 209 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000071 / Aircraft Replacement Support Equip Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD FSC 6635 PHYSICAL PROPERTIES TESTING AND INSPECTION EQUIPMENT (OC) A MEASURING, TEST INSTRUMENTS (OC) MAIS Code Subtotal: AIR FORCE SUSTAINMENT CENTER (OC-ALC) Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: BP12 ITEMS LESS THAN 5 MILLION DOLLARS FY 2027 Base Total Cost Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - - - - 0.000 - - 0.000 - - - - - - - - - - - OTHER F-16 SQUADRON A C-130 MSN Ready Ops A Rivot Joint Mods A Secondary Distribution - - - 0.000 - 0.000 - - - - Subtotal: OTHER AF - - - - - 0.000 - - 0.000 - - - - - - - - - Total - - - - - 0.000 - - - - - 30.409 - - - - - 30.409 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: FEDERAL STOCK CLASS (FSC) Support Equipment and Vehicles (SE&V) 'Fast Characterization Tool (FACT) 4920015711970RN' falls within the AIRCRAFT MAINTENANCE TESTERS Program 'B-1 Maintenance Stands 1730015544187RN' and 'B-4 Maintenance Stands 1730015554366RN' both fall within the AIRCRAFT MAINTENANCE STANDS Program. 'A/M24T-16 Load Bank' falls within the SECONDARY POWER Program. 'Advanced Control Tester (ACT)(SEV)' falls within the AIRCRAFT ENGINE TEST EQUIPMENT Program. 'Miscellaneous AGE' falls within the MISC AEROSPACE GROUND EQUIP (AGE) Program PMA OTHER GOVERNMENT COSTS: This line supports the operation of the program office in its management and oversight role via travel, procurement of supplies, studies and Advisory and Administrative Services (A&AS). Capabilities procure a multitude of related items with different unit costs. Exact quantities may vary based on real world requirements and priorities as established by the Major Commands. Deviations will be updated in the next budget cycle. LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 27 of 36 P-1 Line #71 Volume 1 - 173 === page 210 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000071 / Aircraft Replacement Support Equip Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2026 Total Cost ($ M) Unit Cost ($ M) Qty (Each) Aggregated Items Title: C-5 Common Support Equipment FY 2027 Base Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) Common Support Equipment C-5 Pylon Wing Interface (PWI) Support Equipment A - - - - - - - 3.173 - 3.173 - - 3.231 - 3.231 - - - - - - - - - - - - - - - Secondary Distribution AF Subtotal: Common Support Equipment - - - - - 3.173 - - 3.231 - - - - - - - - - Total - - - - - 3.173 - - 3.231 - - - - - - - - - Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: The BP12 funds are required to procure extra common support equipment for the C-5M Pylon Wing Interface (PWI) repair program. The C-5M PWI program is a permanent structural repair required for the C-5 Fleet. Due to the nature of the repair all engines and pylons must be removed, which requires extra support equipment for removal, storage, and installation of engines, pylons, thrust reversers, and cowl-ings. The equipment will provide storage capability of up to five (5) aircraft concurrently. LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 28 of 36 P-1 Line #71 Volume 1 - 174 === page 211 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000071 / Aircraft Replacement Support Equip Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Flight Line Generators Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Regional Base Cluster Pre-positioning (RBCP) Pacific Deterrence Initiative (PDI) A - - - - - - - - - - - - - - - - - - - - 0.000 - - - 0.000 - - - 0.145 AF - AFNG - AFR - - - - - - - - - - - - - - 455 66.111 0.159 - 300 - 100 - - 55 0.216 20 4.330 20 4.330 - - 4.330 - - - - - - 455 72.197 0.146 43.407 325 14.635 84 8.069 - - - - - - - - - - - - - - 482 70.529 - 52.625 352 12.612 84 46 6.960 0.217 20 4.330 20 4.330 - - 4.330 - - - - - - - - - - - 0.146 482 70.529 50.403 - - 352 50.403 12.970 - - 84 12.970 46 7.156 - - 46 7.156 Secondary Distribution AF Subtotal: Regional Base Cluster Prepositioning (RBCP) Support - Support End Item Cost PMA Other Government Costs A Subtotal: Support - Support End Item Cost Hardware - Hardware End Item Cost Large & Small Flightline Generator A Secondary Distribution Subtotal: Hardware - Hardware End Item Cost - - - - - 66.111 - - 72.197 - - 70.529 - - - - - 70.529 Total - - - - - 66.111 - - 72.197 - - 74.859 - - - - - 74.859 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: Aircraft Replacement Support Equipment is centrally managed as a common platform and PMA costs are shared. This capability procures a multitude of related items with different unit costs. Exact quantities may vary based on real world requirements and priorities as established by the Major Commands. Deviations will be updated in the next budget cycle. LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 29 of 36 P-1 Line #71 Volume 1 - 175 === page 212 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000071 / Aircraft Replacement Support Equip Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: FLIGHTLINE COMPRESSORS FY 2027 Base Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) Regional Base CLuster Pre-Positioning (RBCP) Pacific Deterrence Initiative (PDI) A Subtotal: Regional Base CLuster Pre-Positioning (RBCP) - - 0.000 - - - - - - - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - - - - 0.108 8 0.865 - - - - - - - - - - - - 8 0.865 End Item End Item A Secondary Distribution - - - - - - - - - - Subtotal: End Item AF - - - - - 0.865 - - - - - - - - - - - - Total - - - - - 0.865 - - - - - - - - - - - - Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: This capability procures a multitude of related items with different unit costs. No FY27 funding request for this program. LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 30 of 36 P-1 Line #71 Volume 1 - 176 === page 213 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000071 / Aircraft Replacement Support Equip Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Flightline Heating, Ventilating, Air Conditioning Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Regional Base Cluster Pre-positioning (RBCP) Pacific Deterrence Initiative (PDI) A - - - - - - - - - - - AF - AFNG - AFR - - - - - - - - 0.231 92 21.254 - 36 - 34 - - - - - - - - - - - - - 0.010 - - - - - - - - - - - - - - 0.260 121 31.409 8.544 62 8.187 41 22 4.523 - 0.000 - 0.000 - 21.254 - 1 0.010 0.010 1 0.010 0.210 20 4.190 20 4.190 - - 4.190 0.266 121 32.180 15.140 62 10.437 41 18 5.832 - 0.000 - 0.000 - 31.409 1 0.010 1 0.010 - - - - - - - - - - - 15.391 - 10.818 - 18 5.971 - - - - - - 32.180 - - - - - - - - - 0.210 20 4.190 20 4.190 - - 4.190 0.266 121 32.180 - 62 15.391 - 41 10.818 - - 18 5.971 - - - - - - - - - - - - - 32.180 - - - - - - - - - - - - - - - - - - Secondary Distribution AF Subtotal: Regional Base Cluster Prepositioning (RBCP) Hardware - Hardware End Item Cost Large & Small Flightline HVAC A Secondary Distribution Large & Small Flightline HVAC (EDI/ ECAOS) A - - - - - - Secondary Distribution AF Subtotal: Hardware - Hardware End Item Cost Support - Support End Item Cost PMA: Other Government Charges A Secondary Distribution AF PMA: Other Contractor Services A - - - 0.000 - 0.000 - - 0.000 - 0.000 - - - Secondary Distribution AF Subtotal: Support - Support End Item Cost - - - - - 0.010 - - 0.010 - - - - - - - - - Total - - - - - 21.264 - - 31.419 - - 36.370 - - - - - 36.370 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: Aircraft Replacement Support Equipment is centrally managed as a common platform and PMA costs are shared. This capability procures a multitude of related items with different unit costs. Exact quantities may vary based on real world requirements and priorities as established by the Major Commands. LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 31 of 36 P-1 Line #71 Volume 1 - 177 === page 214 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 1 LI 000071 - Aircraft Replacement Support Equip Air Force P-1 Line Item Number / Title: 000071 / Aircraft Replacement Support Equip UNCLASSIFIED Page 32 of 36 Aggregated Items Title: Flightline Heating, Ventilating, Air Conditioning P-1 Line #71 Volume 1 - 178 === page 215 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000071 / Aircraft Replacement Support Equip Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Hydraulic Servicing Equipment Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Regional Base CLuster Pre-Positioning (RBCP) Pacific Deterrence Initiative (PDI) A - - - - - - - - - - - - - - - - - - - - - - - 0.000 - - - AF - AFNG - AFR - - - - - - - - - - - - - - - - - - 0.000 - 0.000 - - - - - 0.000 - - - - - - - - 0.000 - - - - - - - - - - 0.120 1 0.120 - - 1 0.120 - - - - - 0.120 - - 0.010 - - 0.010 - 0.010 - 0.010 - - 0.010 - - 0.010 - - - - - - - - - - - - - - - - 0.171 25 4.275 0.477 25 11.925 0.000 25 4.275 25 0.000 - - - - 0.000 - - - - - - - - 0.185 17 3.140 - - - 17 3.140 - - 3.140 - - - 0.120 1 0.120 - - 1 0.120 - - - - - 0.120 - - - - - 0.010 - - - 0.010 - - - - - 0.010 - - - - - - - - - - - - - - - - - - - 0.477 25 11.925 11.925 - - 25 11.925 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Secondary Distribution AF Subtotal: Regional Base CLuster Pre-Positioning (RBCP) Support - Support End Item Cost PMA Other Government Costs A Secondary Distribution AF Subtotal: Support - Support End Item Cost Hardware - Hardware End Item Cost UNIVERSAL TRIPLE HYDRAULIC TEST STAND (3 SYS) (DIESEL) A Secondary Distribution AF UNIVERSAL TRIPLE HYDRAULIC TEST STAND (3 SYS) (ELECTRIC A UNIVERSAL HYDRAULIC TEST STAND (2 SYS) (DIESEL) A Secondary Distribution UNIVERSAL HYDRAULIC TEST STAND (2 SYS) (ELECTRIC) A European Defense Initiative (EDI) A Secondary Distribution AF Subtotal: Hardware - Hardware End Item Cost - LI 000071 - Aircraft Replacement Support Equip Air Force - - - - 4.275 UNCLASSIFIED Page 33 of 36 - - - - 11.925 P-1 Line #71 - - - - - 11.925 Volume 1 - 179 === page 216 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000071 / Aircraft Replacement Support Equip Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] Total ID CD MAIS Code Unit Cost ($ M) - Qty (Each) - FY 2025 Total Cost Unit Cost ($ M) ($ M) - - Qty (Each) - FY 2026 Total Cost ($ M) Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. 3.140 Unit Cost ($ M) - Qty (Each) Aggregated Items Title: Hydraulic Servicing Equipment FY 2027 Base Total Cost ($ M) - 4.285 Unit Cost ($ M) - Qty (Each) - FY 2027 OOC Total Cost ($ M) Unit Cost ($ M) 12.055 - Qty (Each) - FY 2027 Total Total Cost Unit Cost ($ M) ($ M) - - Qty (Each) - Total Cost ($ M) 12.055 Remarks: Aircraft Replacement Support Equipment is centrally managed as a common platform and PMA costs are shared. This capability procures a multitude of related items with different unit costs. Exact quantities may vary based on real world requirements and priorities as established by the Major Commands. LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 34 of 36 P-1 Line #71 Volume 1 - 180 === page 217 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000071 / Aircraft Replacement Support Equip Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: MISC AEROSPACE GROUND EQUIP (AGE) FY 2027 Base Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) Regional Base CLuster Pre-Positioning (RBCP) Pacific Deferrence Initiative (PDI) A - - - - - - - - - - - - - - - - - - - - - - - - 0.070 260 18.210 260 18.210 - - 18.210 - - - - - - - - - - - 0.070 260 18.210 260 18.210 - - 18.210 - - - - Secondary Distribution AF Subtotal: Regional Base CLuster Pre-Positioning (RBCP) Hardware - Hardware End Item Cost - - 0.000 - - - - - - - - Subtotal: Hardware - Hardware End Item Cost Hardware A - - 0.000 - - - - - - - - - - - - - - - Total - - - - - - - - - - - 18.210 - - - - - 18.210 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 35 of 36 P-1 Line #71 Volume 1 - 181 === page 218 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000071 / Aircraft Replacement Support Equip Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 1 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Aggregated Items Title: Nondestructive Inspection (NDI) Joint Oil Analysis Program (JOAP) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Regional Base Cluster Pre-positioning (RBCP) Pacific Deterrence Initiative (PDI) A - - - - - - - - - - - AF - AFNG - - - - - - - - - - - - - - - - - - - 0.030 1 0.030 - - 1 0.030 - - - - - 0.030 0.030 246 7.369 0.030 251 7.578 - 245 7.361 250 - 1 0.008 1 - - - 0.030 1 0.030 - - 1 0.030 - - - - - 0.030 - - - 0.030 251 7.578 7.570 - - 250 7.570 0.008 - - 1 0.008 Secondary Distribution AF Subtotal: Regional Base Cluster Prepositioning (RBCP) Hardware Spectrometer Replacement A Secondary Distribution X-Ray Equipment A - - 0.000 - - - - - - - - - - - - - - Misc NDI Equipment A - - 0.000 - - - - - - - - - - - - - - - - - - - - - - - 7.369 - - 7.578 - - - - - 7.578 - - 0.000 - - - - - - - - - - - - - - - Subtotal: Hardware - Support PMA: Other Contractor Services A PMA: Other Government Charges A - - 0.000 - - - - - - - - - - - - - - Subtotal: Support - - 0.000 - - - - - - - - - - - - - - - Total - - - - - - - - 7.369 - - 7.608 - - - - - 7.608 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: This capability procures a multitude of related items with different unit costs. Exact quantities may vary based on real world requirements and priorities as established by the Major Commands. Deviations will be updated in the next budget cycle. PMA OTHER GOVERNMENT COSTS: This line supports the operation of the program office in its management and oversight role via travel, procurement of supplies, studies and Advisory and Administrative Services (A&AS). PMA OTHER CONTRACTOR SERVICES: This funding includes provisions for government contract oversight, technical expertise, and program office support associated with the Nondestructive Inspection & Joint Oil Analysis Program. LI 000071 - Aircraft Replacement Support Equip Air Force UNCLASSIFIED Page 36 of 36 P-1 Line #71 Volume 1 - 182 === page 219 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities B00200 / B-2A / BSA 2: Post Production Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0101127F Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 1.885 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 - 1.885 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 1.885 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 - 1.885 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 1.885 0.000 0.000 - 0.000 0.000 0.000 0.000 0.000 - 1.885 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: This Interim Contractor Support (ICS) in P-1 line provides maintenance and repair capability for depot-level repairs for the Common VLF/LV Receiver (CVR) Increment 1, to meet Air Force Global Strike Command (AFGSC) operational requirements for the B-2 weapon system. The ICS program is an on-condition and limited overhaul repair capability repairing Line Replaceable Units (LRUs) and Shop Replaceable Units (SRUs) associated with CVR Increment 1. ICS also provides travel support and interim repair to new or modified components stemming from the B-2 CVR Increment 1 program until a permanent source of repair has been achieved either organically or through Contractor Depot Maintenance (CDM). ICS will continue to provide interim maintenance and repair capability to B-2 CVR Increment 1 LRUs/SRUs until either an organic repair capability or contractor repair capability is established. Justification: No FY27 funding requested. LI B00200 - B-2A Air Force UNCLASSIFIED Page 1 of 1 P-1 Line #72 Volume 1 - 183 === page 220 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 184 === page 221 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities B002B0 / B-2B / BSA 2: Post Production Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - 63.508 60.526 76.824 - Procurement Quantity (Units in Each) - - - - - - Gross/Weapon System Cost ($ in Millions) - 15.709 18.969 95.457 - 95.457 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 15.709 18.969 95.457 - 95.457 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 15.709 18.969 95.457 - 95.457 112.164 112.164 112.164 To FY 2031 Complete - - - - 63.508 60.526 76.824 - - - - - 63.508 60.526 76.824 - Total 443.157 443.157 443.157 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Interim Contractor Support (ICS) provides maintenance, and repair capability for depot-level repairs to meet Air Force Global Strike Command (AFGSC) operational requirements for the B-2 weapon system. The ICS program is an on-condition and limited overhaul repair capability repairing Line Replaceable Units (LRUs) and Shop Replaceable Units (SRUs) associated with airframe structures, hydro-mechanical components, and avionics components until permanent depot repair capability is established. ICS also provides travel support and interim repair to alternate mission equipment and new or modified components stemming from B-2 aircraft modification programs until a permanent source of repair has been achieved either organically or through Contractor Depot Maintenance (CDM). Weapon System Support Center (WSSC) provides procurement, replacement, upgrade, test, integration, and shipment of B-2 peculiar support equipment (PSE) and Special Test Equipment (STE) capabilities, associated sub-components, and software development equipment and architecture required for B-2 software development and sustainment activities in support of AFGSC operational support facilities, Aircraft Program Depot Maintenance, and Test Ranges. The B-2 WSSC is a one-of-a-kind facility that develops, maintains, sustains, integrates, tests and certifies the B-2 Spirit Software. The B-2 WSSC combines Flight Controls, Radar, Weapons, Navigation, Traffic Control, Communications, Displays, Flight Management, External interfaces, and Defensive Management functionality in a test environment to conduct component, subsystem, and end to end software test before deployment to the test aircraft and/or the operational fleet. B-2 Display Modernization (BDM) will purchase ICS. Multi-Functional Display Unit - Replacement (MDU-Rs) Depot Source of Repair approved May 2022. BDM ICS contract award projected Q3FY26, fielding release occurred in 1QFY26. Additionally, B-2 Adaptable Communications Suite (ACS) 4.0 and B-2 Battlespace Collaborative Combat Communications (B2C3) effort, which includes the Multi-Mission Domain, an Open Missions Systems avionics architecture, and the Airborne Integrated Terminal Group (AITG) Replacement will purchase ICS until final maintenance support is determined. Other Post Production Support (PPS) provides funds to procure, replace, upgrade, test, integrate and ship other PSE and STE capabilities, associated support systems and subcomponents, and software development systems and architecture used in B-2 associated laboratories, sustainment depot maintenance activities, test ranges, and AFGSC operational support facilities. This Line Item covers ICS for legacy components, BDM, ACS 4.0, B2C3 and to support the WSSC. ICS will continue to provide interim maintenance and repair capability to legacy B-2 LRUs/SRUs as well as new aircraft modification components and alternate mission equipment until either an organic repair capability or contractor repair capability is established. LI B002B0 - B-2B Air Force UNCLASSIFIED Page 1 of 4 P-1 Line #73 Volume 1 - 185 === page 222 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities B002B0 / B-2B / BSA 2: Post Production Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Post Production Support funds are used to acquire, replace, upgrade, integrate, and test obsolete B-2 Peculiar Support Equipment and Special Test Equipment capabilities, associated subcomponents, and software development systems and architecture required to support software development and sustainment activities, and other B-2 testing at the Weapon System Support Center, as well as Program Depot Maintenance, Test Range, and Air Force Global Strike Command support facilities. LI B002B0 - B-2B Air Force UNCLASSIFIED Page 2 of 4 P-1 Line #73 Volume 1 - 186 === page 223 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities B002B0 / B-2B / BSA 2: Post Production Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a B-2B - / - - / 15.709 - / 18.969 - / 95.457 - / - - / 95.457 P-40 Total Gross/Weapon System Cost - / - - / 15.709 - / 18.969 - / 95.457 - / - - / 95.457 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Fiscal Year 2027 funding for the Weapon System Support Center (WSSC) provides procurement, replacement, upgrade, test, integration, and shipment of B-2 peculiar support equipment (PSE) and Special Test Equipment (STE) capabilities, associated sub-components, and software development equipment and architecture required for B-2 software development and sustainment activities in support of Air Force Global Strike Command operational support facilities, Aircraft Program Depot Maintenance, and Test Ranges. The B-2 WSSC is a one-of-a-kind facility that develops, maintains, sustains, integrates, tests and certifies the B-2 Spirit Software. The B-2 WSSC combines Flight Controls, Radar, Weapons, Navigation, Traffic Control, Communications, Displays, Flight Management, External interfaces, and Defensive Management functionality in a test environment to conduct component, subsystem, and end to end software test before deployment to the test aircraft and/or the operational fleet. B-2 Display Modernization (BDM) will purchase Interim Contractor Support (ICS). Multi-Functional Display Unit - Replacement (MDU-Rs) Depot Source of Repair was approved May 2022. The BDM ICS contract award is projected Q3FY26. BDM fielding release occurred in 1QFY26. Additionally, B-2 Adaptable Communications Suite 4.0 and B-2 Battlespace Collaborative Combat Communications (B2C3) effort, which includes the Multi-Mission Domain, an Open Mission Systems avionics architecture, and the Airborne Integrated Terminal Group (AITG) Replacement will purchase ICS until final maintenance support is determined. Other Post-Production Support provides funds to procure, replace, upgrade, test, integrate and ship other PSE and STE capabilities, associated support systems and subcomponents, and software development systems and architecture used in B-2 associated laboratories, sustainment depot maintenance activities, test ranges, and Air Force Global Strike Command operational support facilities. FY27 funding increase is needed to address and replace aging PSE and STE in the WSSC. LI B002B0 - B-2B Air Force UNCLASSIFIED Page 3 of 4 P-1 Line #73 Volume 1 - 187 === page 224 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: B002B0 / B-2B Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: B-2B FY 2026 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) Uncategorized PMA A BDM; Program Code AP5000 A ACS; Program Code AP5000 A B2C3: Program Code AP5000 A Legacy ICS; Program Code ap5000 A WSSC; Program Code bem000 A - - - - - 4.219 - - 1.547 - - 1.750 - - - - - 1.750 - - - - - 0.000 - - 3.200 - - 3.500 - - - - - 3.500 - - - - - - - - - - - 2.300 - - - - - 2.300 - - - - - - - - - - - 0.536 - - - - - 0.536 - - - - - 1.145 - - 1.136 - - - - - - - - - - - - - - 10.345 - - 13.086 - - 87.371 - - - - - 87.371 Subtotal: Uncategorized - - - - - 15.709 - - 18.969 - - 95.457 - - - - - 95.457 Total - - - - - 15.709 - - 18.969 - - 95.457 - - - - - 95.457 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: This Line Item covers Interim Contractor Support (ICS) for legacy components, BDM, ACS 4.0, B2C3 and the WSSC. ICS for new B-2 modifications is covered in Line Item 36 under B00200 B-2A. LI B002B0 - B-2B Air Force UNCLASSIFIED Page 4 of 4 P-1 Line #73 Volume 1 - 188 === page 225 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities B05200 / B-52 / BSA 2: Post Production Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0101113F Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - Procurement Quantity (Units in Each) - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 0.000 0.111 0.114 - 0.114 0.116 50.159 Less PY Advance Procurement ($ in Millions) - - - - - - - - Net Procurement (P-1) ($ in Millions) - 0.000 0.111 0.114 - 0.114 0.116 50.159 Plus CY Advance Procurement ($ in Millions) - - - - - - - - Total Obligation Authority ($ in Millions) - 0.000 0.111 0.114 - 0.114 0.116 50.159 118.403 118.403 118.403 To FY 2031 Complete - - 92.073 - - - 92.073 - - - 92.073 - Total 260.976 260.976 260.976 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The B-52 Mission Employment Trainer (MET) program is for the production of the B-52 Family of Systems (FoS) Trainers (aircrew, operations and maintenance). The FoS Trainers includes, but is not limited to, new training devices and Systems Integration Labs (SIL) that will augment and eventually replace the existing B-52 legacy training systems and SIL that are antiquated, not concurrent with the B-52 aircraft, and cost-prohibitive for modernization or sustainment. The current B-52 trainers do not completely satisfy the training tasks specified in various course syllabi. In conjunction with the AFGSC A3/6 signed Future Training Concept, this new FoS approach will train Air Force personnel utilizing low, medium, and high-fidelity training devices. These training devices will leverage a common software architecture, include modularity and open mission systems, be rapidly reprogrammable and network capable, enable accelerated future upgrades, and support affordable sustainment. This FoS concept fulfills the future training needs of the formal training unit (FTU), combat units, and weapons school students spanning the continuum of learning. These new devices/trainers are of paramount importance because of their critical role to future B-52 combat capabilities that must advance through 2050. The B-52H Combat Network Communication Technology (CONECT) acquisition project supports nuclear and conventional operations by upgrading the B-52H fleet with data and voice communications capabilities along with improved threat and situational awareness to support participation in network centric operations. This CONECT modification included procurement of 74 aircraft kits + 2 EMD kits that have all been installed. Ground station mission planning hardware, support equipment, initial spares, and Interim Contractor Support (ICS) will be procured. Additional initial support/readiness efforts will develop and upgrade B-52H training devices with CONECT functionality. The CONECT training device upgrades provide full CONECT functionality to support aircrew training. The Aircrew Training Devices (ATDs) include three B-52H Weapon System Trainers (WST) and two Offensive Station Mission Trainers (OSMT), and the upgrades will also be installed in the Systems Integration Lab (SIL). The Other Government Cost line includes, but is not limited to, Diminishing Manufacturing Sources (DMS) and Material Shortages (DMSMS) costs to maintain the production configuration through the identification, review and monitoring of items with high obsolescence risk potential, classification of identified items according to criticality, identification of alternatives and implementation of resolutions. Resolutions may include non-recurring engineering (NRE) and/or replacement costs for DMSMS components, bridge buys of DMSMS components until NRE can be completed or Life of Type buys, whichever is most appropriate. Included in the Support Equipment line is the planning for establishment of an organic Depot capability, stand-up of the depot, procurement of depot equipment and procurement of the CONECT ground station. Funds may be used to address emerging DMSMS issues, including Life of Type Buys. DMSMS efforts to include removal of end-of-life software/hardware within simulators systems and move to a modular, common open system architecture that is sustainable and cyber-resilient. Implement requirements and standards defined under the Simulator Common Architecture Requirements and Standards (SCARS) initiative. Funds may be used to resolve emerging safety of flight issues, accommodate technology insertion and fulfill Federal Aviation Agency (FAA) or other mandates necessary to ensure continued aircrew safety and mission effectiveness. Post Production Support funds will be managed at the platform level, not at the individual MOD level, and covers all requirements for the B-52 Bomber. LI B05200 - B-52 Air Force UNCLASSIFIED Page 1 of 2 P-1 Line #74 Volume 1 - 189 === page 226 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities B05200 / B-52 / BSA 2: Post Production Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0101113F Line Item MDAP/MAIS Code: N/A This program has associated Research Development Test and Evaluation (RDT&E) funding in PE 0101113F. Justification: This program, Category Uncategorized Item Family of systems Trainers MET, is a new start. Funds will be used for B-52 Mission Employment Trainer (MET) program. For the production of the B-52 Family of Systems (FoS) Trainers (aircrew, operations and maintenance). LI B05200 - B-52 Air Force UNCLASSIFIED Page 2 of 2 P-1 Line #74 Volume 1 - 190 === page 227 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities C01700 / C-17A / BSA 2: Post Production Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0401130F Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 0.000 2.672 3.027 - 3.027 0.483 0.924 2.123 2.164 - 11.393 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 0.000 2.672 3.027 - 3.027 0.483 0.924 2.123 2.164 - 11.393 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 0.000 2.672 3.027 - 3.027 0.483 0.924 2.123 2.164 - 11.393 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: This effort supports Post Production support efforts for the C-17. These funds are required to effectively perform aircraft maintenance at Organizational and Intermediate (O&I) levels of aircraft maintenance at Main Operating Bases (MOBs), Avionics Regional Maintenance Centers (RMCs), Engine RMCs, Enroute locations, Backshop activities, plus requirements in support of the Analytical Condition Inspections. The areas of focus include, but are not limited to: - The Engine Depot Stock & Preservation Kit buy provides investment-funded engine depot replenishment spares to support depot operations. - Purchase of Peculiar and Common Support Equipment for the C-17 (PSE and CSE). CSE is comprised of support equipment used by the C-17 and other programs, while PSE is unique to the C-17. Both are required to effectively perform aircraft maintenance at Organizational and Intermediate (O&I) levels of aircraft maintenance at Main Operating Bases (MOBs), Avionics Regional Maintenance Centers (RMCs), Engine RMCs, Enroute locations, Backshop activities, plus requirements in support of the Analytical Condition Inspections - Materiel Improvement Program (MIP) projects. MIP projects correct Deficiency Report (DR) issues that were discovered during the aircraft production phase. There have been over 275 projects incorporated into production aircraft. Approximately 3 projects remain to be retrofitted to post production aircraft to bring them up to production aircraft configuration. The remaining projects are TCTO -1695 (7 installations), TCTO -2031 (107 installations) and TCTO-2133 (87 installations), equating to a 201 total USAF installations. The projects are worked in conjunction with aircraft heavy maintenance (depot) cycle every 6 years. This modification supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. Funding for this exhibit is contained in PE 0401130F. Justification: In FY 2027, this funding will be primarily used on Material Improvement Program (MIP) installation labor to ensure the previous DRs are corrected during aircraft heavy maintenance. The remaining funding will be used toward engine depot stock and PSE procurement. LI C01700 - C-17A Air Force UNCLASSIFIED Page 1 of 1 P-1 Line #75 Volume 1 - 191 === page 228 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 192 === page 229 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities C0V220 / CV-22 Post Production Support / BSA 2: Post Production Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0401318F Line Item MDAP/MAIS Code: 212 Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 9.604 0.000 5.088 - 5.088 5.019 5.012 5.147 5.247 - 35.117 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 9.604 0.000 5.088 - 5.088 5.019 5.012 5.147 5.247 - 35.117 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 9.604 0.000 5.088 - 5.088 5.019 5.012 5.147 5.247 - 35.117 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The CV-22 is the US Air Force Special Operations Forces (SOF) variant of the joint multi-mission V-22 tilt-rotor aircraft. The aircraft provides long-range infiltration, exfiltration, personnel recovery, and re-supply of SOF in politically sensitive and hostile/denied areas. The Navy is the lead service for the joint V-22 program and has overall responsibility for managing all V-22 variants, including the Air Force CV-22 variant. CV-22 Post Production support funding enables the seamless transition from the production phase of the program to the operations and support (O&S) phase. Post Production support funding is required to procure support equipment and integrated logistics support (ILS) requirements affiliated with sustainment of CV-22 modifications to improve operational effectiveness, readiness, and aircraft availability of the worldwide CV-22 fleet. Funding for this exhibit contained in PE 0401318F. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. LI C0V220 - CV-22 Post Production Support Air Force UNCLASSIFIED Page 1 of 3 P-1 Line #76 Volume 1 - 193 === page 230 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities C0V220 / CV-22 Post Production Support / BSA 2: Post Production Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0401318F Line Item MDAP/MAIS Code: 212 Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a CV-22 Post Production Support - / - - / 9.604 - / 0.000 - / 5.088 - / - - / 5.088 P-40 Total Gross/Weapon System Cost - / - - / 9.604 - / 0.000 - / 5.088 - / - - / 5.088 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY27 funding procures Peculiar Support Equipment, Simulator Support and Production Integrated Logistics Support. Additionally, this funding will support emerging safety of flight and DMS issues, accommodate technology insertion, respond to field support equipment issues, production tooling storage management and fulfil federal aviation administration or other mandates to ensure continuous aircrew safety maintenance capability and mission effectiveness LI C0V220 - CV-22 Post Production Support Air Force UNCLASSIFIED Page 2 of 3 P-1 Line #76 Volume 1 - 194 === page 231 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: C0V220 / CV-22 Post Production Support Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: CV-22 Post Production Support FY 2027 Base Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) Operations and Support Peculiar Support Equipment A Simulator Support A Production Integrated Logistics Support A - - - - - 5.364 - - 0.000 - - 4.000 - - - - - 4.000 - - - - - - - - - - - - 0.000 - - 0.500 - - - - - 0.500 - 4.240 - - 0.000 - - 0.588 - - - - - 0.588 Subtotal: Operations and Support - - - Total - - - - - 9.604 - - 0.000 - - 5.088 - - - - - 5.088 - - 9.604 - - 0.000 - - 5.088 - - - - - 5.088 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. LI C0V220 - CV-22 Post Production Support Air Force UNCLASSIFIED Page 3 of 3 P-1 Line #76 Volume 1 - 195 === page 232 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 196 === page 233 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities F01500 / F-15 / BSA 2: Post Production Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 0.000 5.112 0.000 - 0.000 0.000 0.000 0.000 0.000 - 5.112 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 0.000 5.112 0.000 - 0.000 0.000 0.000 0.000 0.000 - 5.112 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 0.000 5.112 0.000 - 0.000 0.000 0.000 0.000 0.000 - 5.112 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The F-15C and F-15D Eagle are highly maneuverable all-weather air superiority fighters. The F-15E Strike Eagle retains the basic air-to-air capability of the F-15C and F-15D, but adds a weapon systems officer (WSO), rear cockpit, conformal fuel tanks, and advanced systems for all-weather, day/night, all-altitude, deep penetration, air-to-surface attack. F-15E Integrated Aircrew Trainers (IATs), funded in PE 0207134F, supported the procurement of additional IATs in order to better implement formal syllabus training and meet HAF intent by preparing for 20% increase in FTU production (in accordance with ACC/A3T memo, dated 29 Jun 2016). Training plans included moving all Computer Based Training (CBTs) from desktop PCs to the IATs for increased fidelity and reduced Subject Matter Expert (SME) hours when teaching basic avionics use in IATs and Mission Training Center (MTC) events. Through FY 2023, the program continued post-production support of the F-15C, F-15D, and F-15E support equipment and tooling, to include Electronic Systems Test Set (ESTS) and post production support for the F-15 tooling storage at Granite City, IL. This equipment is used for the manufacture, test, support, or repair of the F-15 aircraft and/or its associated system components. The retention of Special Tooling/ Special Test Equipment (ST/STE) is based on past usage history, current spare/repair parts contracts, and projections for future requirements. In accordance with Section 1815 of the FY2008 National Defense Authorization Act (P.L. 110-181), this item is necessary for use by the active and reserve components of the Armed Forces for homeland defense missions, domestic emergency response, and providing military support to civil authorities. No Research Development Test and Evaluation funding is associated with this effort. Funds may be used to address Diminishing manufacturing Sources (DMS) efforts to include removal of end-of-life software/hardware within simulators systems and move to a modular, common open system architecture that is sustainable and cyber-resilient. Tooling is loaned/leased to support manufacturing of spares, as well as to support the execution of modification programs, life extension activities, and sustainment efforts. Justification: FY2027 has no funding requested LI F01500 - F-15 Air Force UNCLASSIFIED Page 1 of 2 P-1 Line #78 Volume 1 - 197 === page 234 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities F01500 / F-15 / BSA 2: Post Production Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A FY2026 funds supports F-15 Conformal Fuel Tank (CFT) fixtures and tech data required to overhaul (repair and upgrade) existing CFTs, in accordance with Depot Source of Repair documentation. Funding also supports annual tool storage costs. F-15 tooling including approximately 65,000 active assets valued at $1.9B. LI F01500 - F-15 Air Force UNCLASSIFIED Page 2 of 2 P-1 Line #78 Volume 1 - 198 === page 235 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities F015EX / F-15EX / BSA 2: Post Production Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - 70.560 25.600 25.600 - Procurement Quantity (Units in Each) - - - - - - Gross/Weapon System Cost ($ in Millions) - 0.000 0.000 16.930 - 16.930 Less PY Advance Procurement ($ in Millions) - - - - - - Net Procurement (P-1) ($ in Millions) - 0.000 0.000 16.930 - 16.930 Plus CY Advance Procurement ($ in Millions) - - - - - - Total Obligation Authority ($ in Millions) - 0.000 0.000 16.930 - 16.930 124.200 124.200 124.200 To FY 2031 Complete - - - - 70.560 25.600 25.600 - - - - - 70.560 25.600 25.600 - Total 262.890 262.890 262.890 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The F-15EX is a new multirole-capable fighter jet based on the 2-seat F-15QA (Qatar) configuration upgraded with advanced capabilities, including the Eagle Passive Active Warning Survivability System (EPAWSS) and the USAF F-15 Continuous Delivery & Integration (CD&I) Operational Flight Program (OFP) software. The F-15EX provides significant operational flexibility, enabling it to perform a wide range of mission sets with one or two aircrew. The F-15EX will be used predominantly in defensive and offensive counter-air missions at both Air National Guard (ANG) and Air Combat Command (ACC) operational squadrons. The F-15EX will perform the Homeland Defense mission and provide Combatant Commanders (CCDR) with strike packages capable of operating in Highly Contested Environments (HCE). These funds allow the contractor to provide program management, engineering, and support services for the F-15EX platform. This includes providing all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform services including System Engineering Program Management (SEPM) support. Additionally, the contractor will provide supply chain management for F-15EX unique parts which are not currently managed within the USAF supply system. This management includes procurement, delivery, receipt, storage, inventory control, and item management. Funding will be used to address Diminishing Manufacturing Sources (DMS) issues. Funding also allows the delivery of support equipment in an assembled, calibrated, and ready for use configuration. Support equipment is used for loading/unloading & transporting of aerial stores including munitions, conformal fuel tanks, pylons, and special weapons. Support equipment is also used for cooling, power, testing and support of on-board systems both in the field and at Robins AFB. The support equipment is required to maintain fully mission capable aircraft and supports aircraft availability. Funding allows integration of common systems and the needed support equipment to repair, operate and test. LI F015EX - F-15EX Air Force UNCLASSIFIED Page 1 of 3 P-1 Line #79 Volume 1 - 199 === page 236 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities F015EX / F-15EX / BSA 2: Post Production Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a F-15EX - / - - / 0.000 - / 0.000 - / 16.930 - / - - / 16.930 P-40 Total Gross/Weapon System Cost - / - - / 0.000 - / 0.000 - / 16.930 - / - - / 16.930 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Funding for this exhibit contained in PE 0207146F. LI F015EX - F-15EX Air Force UNCLASSIFIED Page 2 of 3 P-1 Line #79 Volume 1 - 200 === page 237 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: F015EX / F-15EX Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: F-15EX FY 2026 Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) Support - F-15EX Cost - - - - - 0.000 - - 0.000 - - 16.930 - - - - - 16.930 Subtotal: Support - F-15EX Cost New Item A - - - - - 0.000 - - 0.000 - - 16.930 - - - - - 16.930 Total - - - - - 0.000 - - 0.000 - - 16.930 - - - - - 16.930 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. LI F015EX - F-15EX Air Force UNCLASSIFIED Page 3 of 3 P-1 Line #79 Volume 1 - 201 === page 238 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 202 === page 239 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities F0160P / F-16 Post Production Support / BSA 2: Post Production Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Procurement Quantity (Units in Each) - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 62.368 18.402 57.781 - 57.781 36.275 57.403 31.623 40.390 - Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 62.368 18.402 57.781 - 57.781 36.275 57.403 31.623 40.390 - Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 62.368 18.402 57.781 - 57.781 36.275 57.403 31.623 40.390 - Total 304.242 304.242 304.242 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The F-16 is a multi-role fighter that comprises roughly 40% of the USAF fighter fleet with over 810 aircraft supporting a variety of air-to-air and air-to-surface missions, such as offensive and defensive counterair, close air support, forward air control, air interdiction (day/night and all-weather), and Suppression of Enemy Air Defenses (SEAD)/Destruction of Enemy Air Defenses (DEAD). F-16 posture and readiness combined with low operating costs delivers affordable capacity for the USAF and partner nations. Its capabilities continue to evolve, capitalizing upon advancements made in computers, avionics systems, engines, and structural technologies. These advancements meet emerging warfighter requirements to combat current and evolving enemy threats. This request will provide funding for F-16 support equipment, facilities support, interim contractor support and production tooling storage management. The FY 2026 spend plan amount for Aircraft procurement includes 18,402 thousand of discretionary and 5,200 thousand of mandatory (reconciliation) for a total of 23,602 thousand. In FY25, a Congressional Add provided a $50M increase to procure F-16 Simulators for ANG. Funding for this exhibit is contained in PE 0207133F LI F0160P - F-16 Post Production Support Air Force UNCLASSIFIED Page 1 of 3 P-1 Line #80 Volume 1 - 203 === page 240 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities F0160P / F-16 Post Production Support / BSA 2: Post Production Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a F-16 Post Production Support - / - - / 62.368 - / 18.402 - / 57.781 - / - - / 57.781 P-40 Total Gross/Weapon System Cost - / - - / 62.368 - / 18.402 - / 57.781 - / - - / 57.781 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: This program, Category Post Production Support Item 600 Gallon Fuel Tanks, is a new start. Effort includes additional funding FY27-29 to purchase up to 250 shipsets. FY27 funding requested supports procurement for post production support including, but not limited to, continuation of prime contractor post production support, procurement of deferred peculiar ground support equipment, peculiar training equipment, peculiar support equipment, mission support, interim contract support for F-16 Modification programs: Active Electronically Scanned Array (AESA), Modular Mission Computer/Programmable Display Generator (MMC/PDG), Comm Suite Upgrade, AGCAS, Secure Mission Data Systems (SMDS), 600 Gallon Fuel Tanks, Simulators, AIFF Mode 5, Auto-GCAS, Helmet-Mounted Integrated Targeting (HMIT). Prior year funding for F-16 Post Production Support was also identified in F01600. The program has moved all requirements to this budget exhibit. The Production Tooling Storage Management contract is essential to the F-16 Program as it requires specialized engineering services to ensure continued fleet support capability during, and beyond production lines. The USG stores tooling identified as required to be re-utilized to manufacture spares, support aircraft modifications, or other purposes. It would require millions of dollars to re-manufacture these tools and the delivery lead-time of the required tool/part would take several years to reproduce. The requirement is to maintain the Electronic Tool Inventory Management System (eTIMS) in cooperation with the Lexes Inc. and Lockheed Martin Aeronautics Inc, as well as the actual tear-down, shipping, and storage of unique aircraft manufacturing equipment. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. LI F0160P - F-16 Post Production Support Air Force UNCLASSIFIED Page 2 of 3 P-1 Line #80 Volume 1 - 204 === page 241 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: F0160P / F-16 Post Production Support Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2026 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: F-16 Post Production Support FY 2027 Base Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) Post Production Support 600 Gallon Fuel Tanks A AESA Mode 5 - - - - - - - - - - - 39.595 - - - - - A - - - - - 10.968 - A - - - - - - - - - - - 0.152 - SMDS A - - - - - - AGCAS A - - - - - - - - 4.865 - - 0.282 SLEP A - - - - - - - - Helmet Mounted Integrated Targeting A - - - - MMC/PDG A - - - - - - - - 1.000 - Comm Suite Upgrade A - - - - - 0.400 Simulators A - - - - - Subtotal: Post Production Support - - - - Total - - - - - - - - - 7.191 - - - - - 7.191 - - 5.268 - - - - - 5.268 - - 0.386 - - - - - 0.386 5.004 - - - - - - - - - - 0.555 - - 0.568 - - - - - 0.568 - 3.720 - - 1.259 - - - - - 1.259 - - 3.824 - - 3.514 - - - - - 3.514 50.000 - - - - - - - - - - - - - 62.368 - - 18.402 - - 57.781 - - - - - 57.781 - - - - - 62.368 - - 18.402 - - 57.781 - - - - - 57.781 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. LI F0160P - F-16 Post Production Support Air Force UNCLASSIFIED Page 3 of 3 P-1 Line #80 39.595 Volume 1 - 205 === page 242 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 206 === page 243 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities HCMC00 / HC/MC-130 Post Prod / BSA 2: Post Production Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0207224F, 0207230F Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Procurement Quantity (Units in Each) - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 18.604 17.986 20.415 - 20.415 19.469 19.588 20.185 20.583 - Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 18.604 17.986 20.415 - 20.415 19.469 19.588 20.185 20.583 - Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 18.604 17.986 20.415 - 20.415 19.469 19.588 20.185 20.583 - Total 136.830 136.830 136.830 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The Post Production Support Program for AC/HC/MC-130Js supports all out-of-production aircraft, allows for corrections of production deficiencies, and includes all other items/activities needed to support the AC/HC/MC-130Js once the production line is complete. Activities include but are not limited to: stand up, replacement, and/or increased requirement of Primary Mission Equipment (PME); Diminishing Manufacturing Sources/Material Shortages (DMS/MS) and obsolescence solutions to include, if optimal, lifetime buys or bridge buys limited to the program of record quantity; Program Support Costs (PSC); Government Services; fielding of/upgrades to simulators/training devices; Interim Contractor Support (ICS) with transition to Contractor Logistics Support (CLS); purchase of Government Furnished Equipment (GFE); Publications/Technical Data; Crypto Updates; data, kits, deployment packages, Engineering Services and Reachback Support to the OEM, technical refreshes, related program costs needed to field and sustain the capability, and other Government costs. This program also addresses post-delivery and field support needs such as, training, interim supply support, deferred support equipment (initial peculiar), support equipment, and replacement of organizational and intermediate level peculiar support equipment. It also includes procurement of additional quantities of support equipment in support of force structure changes that increase the number of bases requiring support equipment during the post production period of the weapon system (e.g., conversion of active to guard/reserve forces) and procurement of investment type replenishment spares and repair parts which are exempt from the AF Working Capital Fund, Supply Division. LI HCMC00 - HC/MC-130 Post Prod Air Force UNCLASSIFIED Page 1 of 3 P-1 Line #81 Volume 1 - 207 === page 244 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities HCMC00 / HC/MC-130 Post Prod / BSA 2: Post Production Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0207224F, 0207230F Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a HC/MC-130 Post Prod - / - - / 18.604 - / 17.986 - / 20.415 - / - - / 20.415 P-40 Total Gross/Weapon System Cost - / - - / 18.604 - / 17.986 - / 20.415 - / - - / 20.415 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Efforts in FY 2027 include Program Support Costs and Post Delivery Support. LI HCMC00 - HC/MC-130 Post Prod Air Force UNCLASSIFIED Page 2 of 3 P-1 Line #81 Volume 1 - 208 === page 245 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: HCMC00 / HC/MC-130 Post Prod Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: HC/MC-130 Post Prod FY 2026 Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) Training Equipment A - - - - - - - - 0.000 - - - - - - - - - Subtotal: Training Equipment Training Equipment - - - - - - - - 0.000 - - - - - - - - - - - - - - 2.381 - - 2.500 - - 2.620 - - - - - 2.620 - - - - - 2.381 - - 2.500 - - 2.620 - - - - - 2.620 Post Delivery Support Post Delivery Support A Subtotal: Post Delivery Support Program Support Cost - - - - - 16.223 - - 15.486 - - 17.795 - - - - - 17.795 Subtotal: Program Support Cost Program Support Cost A - - - - - 16.223 - - 15.486 - - 17.795 - - - - - 17.795 Total - - - - - 18.604 - - 17.986 - - 20.415 - - - - - 20.415 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. LI HCMC00 - HC/MC-130 Post Prod Air Force UNCLASSIFIED Page 3 of 3 P-1 Line #81 Volume 1 - 209 === page 246 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 210 === page 247 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities JSE000 / Joint Simulation Environment Post Production Support / BSA 2: Post Production Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 0.000 28.524 0.000 - 0.000 0.000 0.000 0.000 0.000 - 28.524 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 0.000 28.524 0.000 - 0.000 0.000 0.000 0.000 0.000 - 28.524 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 0.000 28.524 0.000 - 0.000 0.000 0.000 0.000 0.000 - 28.524 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Funding is for the procurement of various Platform-in-a-Box (PIAB) and platform specific battlestation training equipment to include, but not limited to, hardware, software, licenses, peripheral equipment and sub-systems, visual display system, initial spares, install, and integration of those systems into the Joint Simulation Environment (JSE) battlespace. PIABs are the High-fidelity Operational Flight Program (OFP)-based, JSE-compliant/native simulators, featuring OEM-produced OFP-equivalent mission system & sensor software models capable of faithfully representing airborne platform performance. PIABs and battlestations will be used at various Joint Integrated Test & Training Center (JITTC) locations including but not limited to; Nellis AFB and Joint Base Elmendorf-Richardson, leveraging the JSE. PIABs and battlestations will support training operations, large force exercises, and local small force events. The intent is to replicate and expand the current digital test & training range capabilities allowing multiple dissimilar PIABs and battlestations to operate in a common environment without concern for airspace constraints, threat density, and outside surveillance, while protecting friendly capability Tactics, Techniques, and Procedures (TTPs) and future capabilities. Funding also procures the cockpits and interfaces to host Virtual Airborne Threat Solution - a virtual (operator-in-the-loop) threat representation capability enabling opposition force (OPFOR) to represent a broad selection of adversary aircraft based upon the particular test or training scenario. This capability incorporates Intel Center-developed, authoritative threat models with a USG-developed aircraft simulation architecture which enables aircraft capabilities and performance characteristics to be mapped to a single platform-agnostic cockpit and set of pilot-vehicle interfaces (PVI). JSE leverages 5th+ Generation Operational Test and Evaluation capability to improve TTPs in an operationally relevant environment. JITTCs support large force exercises and the United States Air Force Warfare Center, Weapons Instructor Course syllabus through Weapon School Integration. The high-fidelity simulator training to be provided by JSE improves the throughput capacity of Formal Training Unit and joint warfighter tactical readiness. Funding may also be used to address Diminishing Manufacturing Sources issues, obsolescence resolution and similar emerging requirements, as well as overarching programmatic support. This requirement (or modification) supports performance of a full financial audit as required by title 10 U.S.C. Chapter 9A, Sec 240-D. Funding for this exhibit is contained in PE 0207606F. Justification: Fiscal year 2027 Joint Simulation Environment (JSE) funds support the procurement of various Platform-in-a-box (PIAB) and platform specific battlestation entities to include, but not limited to, F-35, F-22, F-16, Virtual Air Threat System (VATS), and general hardware to support use of the PIABs and battlestations at the Joint Integrated Test & Training Centers. Funds also support the procurement of supporting battlestation hardware including but not limited to, control and reporting center, battle control center, and tactical operations center. JSE supports virtual training capability in support of joint warfighter readiness requirements across test, tactical, operational, and strategic levels. Funding in this PE invests in programs to meet Office of the Secretary of War and Chief of Staff of the Air Force initiatives to improve operational training against peer/near-peer threats for combat-coded operational units, as well as supporting High-End Advanced Tactics, Training, and Testing capability. LI JSE000 - Joint Simulation Environment Post Produc... Air Force UNCLASSIFIED Page 1 of 2 P-1 Line #82 Volume 1 - 211 === page 248 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities JSE000 / Joint Simulation Environment Post Production Support / BSA 2: Post Production Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Beginning in FY 2027, Joint Simulation Environment, Project JSE000, BA07, Aircraft support equipment and facilities, Post Production Support, Program 0207606F efforts were realigned to Joint Simulation Environment, Project JSE000 - BA01, Combat Aircraft, Joint Simulation Environment, Project 0207606F, in order to properly execute the funding for the program based on the Program's execution status within the Software Acquisition Pathway. LI JSE000 - Joint Simulation Environment Post Produc... Air Force UNCLASSIFIED Page 2 of 2 P-1 Line #82 Volume 1 - 212 === page 249 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities PRDTB5 / MQ-9 Post Prod / BSA 2: Post Production Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Total Procurement Quantity (Units in Each) - - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 0.000 0.000 15.365 - 15.365 0.000 0.000 0.000 0.000 - 15.365 Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 0.000 0.000 15.365 - 15.365 0.000 0.000 0.000 0.000 - 15.365 Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 0.000 0.000 15.365 - 15.365 0.000 0.000 0.000 0.000 - 15.365 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: MQ-9 Reaper post production support includes all components of the MQ-9 weapon system. The basic MQ-9 Reaper system consists of the aircraft, sensors, a Ground Control Station (GCS), communications equipment, weapon kits, support equipment, simulator and training devices, technical data/training, and personnel required to operate, maintain, and sustain the system. The system is designed to be modular and open-ended. Mission-specific equipment is employed in a plug-and-play mission kit concept allowing specific aircraft and Ground Control Station (GCS) configurations to be tailored to fit mission needs. MQ-9 post-production funding continues to be used to address, but not limited to, emerging and short notice DMS and DMSMS issues that affect safety of flight associated with legacy ground and air segment equipment, accommodate technology insertion, and fulfill FAA or other mandates necessary to ensure continued aircrew safety and mission effectiveness. Funds may also be used for Interim Contract Support, production tooling storage management, and production line shutdown activities. Funding for this exhibit contained in PE 0205219F. LI PRDTB5 - MQ-9 Post Prod Air Force UNCLASSIFIED Page 1 of 3 P-1 Line #83 Volume 1 - 213 === page 250 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities PRDTB5 / MQ-9 Post Prod / BSA 2: Post Production Support ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a MQ-9 Post Prod - / - - / 0.000 - / 0.000 - / 15.365 - / - - / 15.365 P-40 Total Gross/Weapon System Cost - / - - / 0.000 - / 0.000 - / 15.365 - / - - / 15.365 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: This program, Category Uncategorized Item MQ-9, is a new start. MQ-9 post-production funding continues to be used to address, but not limited to, emerging and short notice DMS and DMSMS issues that affect safety of flight associated with legacy ground and air segment equipment, specifically Expeditionary Line of Sight aircraft control. Funds may also be used to accommodate technology insertion, Interim Contract Support, production tooling storage management, and fulfill FAA or other mandates necessary to ensure continued aircrew safety and mission effectiveness. LI PRDTB5 - MQ-9 Post Prod Air Force UNCLASSIFIED Page 2 of 3 P-1 Line #83 Volume 1 - 214 === page 251 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: PRDTB5 / MQ-9 Post Prod Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 2 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: MQ-9 Post Prod FY 2026 Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Uncategorized - - - - - 0.000 - - 0.000 15.365 15.365 - - - 15.365 Subtotal: Uncategorized MQ-9 A - - - - - 0.000 - - 0.000 - - 15.365 - - - - - 15.365 Total - - - - - 0.000 - - 0.000 - - 15.365 - - - - - 15.365 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. 1 1 15.365 Remarks: MQ-9 Reaper post production support includes all components of the MQ-9 weapon system. The basic MQ-9 Reaper system consists of the aircraft, sensors, a Ground Control Station (GCS), communications equipment, weapon kits, support equipment, simulator and training devices, technical data/training, and personnel required to operate, maintain, and sustain the system. The system is designed to be modular and open-ended. Mission-specific equipment is employed in a plug-and-play mission kit concept allowing specific aircraft and Ground Control Station (GCS) configurations to be tailored to fit mission needs. MQ-9 post-production funds will be used to address, but not limited to, emerging and short notice DMS and MSMS issues that affect safety of flight associated with legacy ground and air segment equipment, accommodate technology insertion, and fulfill FAA or other mandates necessary to ensure continued aircrew safety and mission effectiveness. Funds may also be used for Interim Contract Support, production tooling storage management, and production line shutdown activities. Funding for this exhibit contained in PE 0205219F. LI PRDTB5 - MQ-9 Post Prod Air Force UNCLASSIFIED Page 3 of 3 P-1 Line #83 Volume 1 - 215 === page 252 === UNCLASSIFIED THIS PAGE INTENTIONALLY LEFT BLANK UNCLASSIFIED Volume 1 - 216 === page 253 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities 000073 / Industrial Responsiveness / BSA 3: Industrial Preparedness ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Procurement Quantity (Units in Each) - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 20.004 19.998 20.590 - 20.590 21.101 21.488 21.907 22.334 - Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 20.004 19.998 20.590 - 20.590 21.101 21.488 21.907 22.334 - Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 20.004 19.998 20.590 - 20.590 21.101 21.488 21.907 22.334 - Total 147.422 147.422 147.422 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The Air Force Industrial Preparedness program element combines the resources of several appropriations (Aircraft Procurement, Missile Procurement, and Operation and Maintenance) which includes capital type rehabilitation (MPC 3000), industrial base concerns (MPC 6000), pollution prevention (MPC 6044), and environmental compliance (MPC 7000) to create a comprehensive program that aids in ensuring the defense industry can supply reliable, safe, affordable systems to operational commanders. 1. The Air Force (AF) Industrial Preparedness program element Aircraft Procurement appropriation and Operation and Maintenance appropriation ensures the defense industry can supply reliable, secure, safe, affordable systems to operational commanders through management and upkeep of Air Force Plant 4, Fort Worth, TX; Air Force Plant 6, Marietta, GA; and Air Force Plant 42, Palmdale, CA. Funds are used to 1) manage and sustain industrial plant assets to meet the nation's missile production needs; 2) comply with environmental laws and regulations; 3) prevent pollution through qualifying alternatives to hazardous materials used in production of aircraft weapons systems 2. Four basic activities are funded in this appropriation: Industrial Facilities (3000), Environmental Compliance (7000), Pollution Prevention (6044), and Industrial Base Assessments (6000). Industrial Facility Capital Type Rehabilitation cost element (MPC 3000) provides for repair and expansion, major capital rehabilitation, construction, demolition, equipment, real property directives (appraisals, easements, physical condition reports, assessments, etc.) and energy conservation to ensure USAF-owned, contractor-operated (GOCO) industrial facilities remain operationally safe, secure, suitable and effective to meet the nation's weapon system industry needs. These plants are the backbone of defense weapon system assembly and maintenance for the B-2, B-21, U-2, C-130J, RQ-4 Global Hawk, F-35 Joint Strike Fighter and classified programs and it is the intent of Congress (10 USC 2535) to provide an essential nucleus of government owned industrial plants. Environmental Compliance cost element (MPC 7000) provides for the efforts needed to maintain compliance with environmental laws and regulations governing GOCO industrial facilities. Environmentally compliant industrial facilities enable production to continue and grow to meet our nation's weapon system needs and avoid risk of shutdown due to non-compliance, clean-up costs, and civil fines and penalties. Pollution Prevention (P2) cost element (MPC 6044) at GOCO industrial facilities qualifies alternatives to hazardous materials for implementation on aircraft weapons systems to i) improve safety to workers and the environment; ii) improve aircraft production processes and performance; and iii) return on investments to save funds over the aircraft system lifecycle. Activities support the Pollution Prevention Act and federal goals and policies. Industrial Base Assessment cost element (MPC 6000) provides for the identification, analysis and assessment of industrial base concerns dealing with aircraft research and development, production, and sustainment. These assessments provide timely and accurate industrial base information to support AF decisions on 1) aircraft weapon system acquisition risks; 2) budget allocation investments; 3) weapon system sustainment and logistics support; and 4) defense industry mergers, acquisitions, and divestitures. Supports Joint and Service industrial base planning on shared commodities, technologies, and facilities. LI 000073 - Industrial Responsiveness Air Force UNCLASSIFIED Page 1 of 4 P-1 Line #84 Volume 1 - 217 === page 254 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities 000073 / Industrial Responsiveness / BSA 3: Industrial Preparedness ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Funding for this exhibit is contained in PE 0708011F. LI 000073 - Industrial Responsiveness Air Force UNCLASSIFIED Page 2 of 4 P-1 Line #84 Volume 1 - 218 === page 255 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities 000073 / Industrial Responsiveness / BSA 3: Industrial Preparedness ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: N/A Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Industrial Responsiveness - / - - / 20.004 - / 19.998 - / 20.590 - / - - / 20.590 P-40 Total Gross/Weapon System Cost - / - - / 20.004 - / 19.998 - / 20.590 - / - - / 20.590 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY27 Requirements are for MPC 3000 Capital Type Rehabilitation, MPC 6000 Industrial Base Assessment, MPC 7000 Environmental Compliance and MPC 6044 Pollution Prevention. LI 000073 - Industrial Responsiveness Air Force UNCLASSIFIED Page 3 of 4 P-1 Line #84 Volume 1 - 219 === page 256 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000073 / Industrial Responsiveness Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 3 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: Industrial Responsiveness FY 2026 Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) Uncategorized Pollution Prevention (6044) DDA000 A Capital Type Rehabilitation (MPC 3000) ALY000 A Industrial Base Assessment (MPC 6000) ALZ000 A Environmental Compliance (MPC 7000) ALY000 A - - - - - 2.678 - - 2.394 - - 2.817 - - - - - 2.817 - - - - - 8.090 - - 8.217 - - 16.575 - - - - - 16.575 - - - - - 1.146 - - 1.170 - - 1.198 - - - - - 1.198 - - - - - 8.090 - - 8.217 - - 0.000 - - - - - 0.000 Subtotal: Uncategorized - - - - - 20.004 - - 19.998 - - 20.590 - - - - - 20.590 Total - - - - - 20.004 - - 19.998 - - 20.590 - - - - - 20.590 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. LI 000073 - Industrial Responsiveness Air Force UNCLASSIFIED Page 4 of 4 P-1 Line #84 Volume 1 - 220 === page 257 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities 000074 / War Consumables / BSA 4: War Consumables ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0207040F, 0305116F Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 To FY 2031 Complete Procurement Quantity (Units in Each) - - - - - - - - - - - Gross/Weapon System Cost ($ in Millions) - 25.908 26.323 85.387 - 85.387 65.181 66.798 67.805 68.847 - Less PY Advance Procurement ($ in Millions) - - - - - - - - - - - Net Procurement (P-1) ($ in Millions) - 25.908 26.323 85.387 - 85.387 65.181 66.798 67.805 68.847 - Plus CY Advance Procurement ($ in Millions) - - - - - - - - - - - Total Obligation Authority ($ in Millions) - 25.908 26.323 85.387 - 85.387 65.181 66.798 67.805 68.847 - Total 406.249 406.249 406.249 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: Advanced Expendable Countermeasures (AECM) includes ALE-70 and ALQ-260. These are multi-platform electronic warfare countermeasures that provide aircraft self-protection against air-to-air and surfaceto-air radar guided threats. Funds procure all system components: decoys, canisters, and explosive cartridges to deploy the decoys. Funding increase from FY26 to FY27 to meet inventory objective of all AECMs. RATO: The Rocket-Assisted Take-Off (RATO) motor is a solid propellant rocket used to provide launching thrust to the Air Force Subscale Aerial Target (AFSAT) drone (BQM-167). Support items include reefing line cutters, igniters, and initiators. The RATO and the associated support items are single use items. Procurement quantities can change based on negotiated options/pricing bands and available funding, in accordance with Title 10, U.S Code Section 2308 BUY-TO-BUDGET ACQUISITION. Additional units can be procured based on production efficiencies or cost reductions. Procurements for the execution year may vary due to changes in inventory objectives. Combatant commanders' requirements for Operational Plans influence these objectives, which are updated throughout the year. Funds may be used to address production Diminishing Manufacturing Sources (DMS)/Material Shortages/Obsolescence issues through studies, bridge buys, life of type buys, supplier/parts replacement, to include electronic components used commercially and in short supply, qualification and lab activities to preserve future production capabilities and capacities. Funding for this exhibit contained in Program Elements PE 0207442F, 0305116F, and 0207040F. LI 000074 - War Consumables Air Force UNCLASSIFIED Page 1 of 4 P-1 Line #85 Volume 1 - 221 === page 258 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities 000074 / War Consumables / BSA 4: War Consumables ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0207040F, 0305116F Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a Aerial Targets - / - - / 5.225 - / 5.295 - / 5.446 - / - - / 5.446 P-40a Multi-Platform Electronic Warfare Equipment - / - - / 20.683 - / 21.028 - / 79.941 - / - - / 79.941 P-40 Total Gross/Weapon System Cost - / - - / 25.908 - / 26.323 - / 85.387 - / - - / 85.387 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: Advanced Expendable Countermeasures (ALE-70 and ALQ-260): FY 2027 funds procure quantities to meet new Combatant Command requirements and inventory objectives; funds support all system components: decoys, canisters, and explosive cartridges to deploy the decoys. RATO: FY 2027 funding required to procure RATO booster (HB32), initiator (HB31, VN17). LI 000074 - War Consumables Air Force UNCLASSIFIED Page 2 of 4 P-1 Line #85 Volume 1 - 222 === page 259 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000074 / War Consumables Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 4 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) FY 2026 Total Cost Qty (Each) Aggregated Items Title: Aerial Targets Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) Uncategorized RATO booster (ATK DODIC HA39) A RATO booster (HB32) RATO initiator (HB31) MK44 "Impulse Cart" (M514) A H1.4 Cutter A Initiator (ATK DODIC VN17) A MK17 (M934) PMA - - 0.000 - - - - - - - - - - - - - - - A - - - 0.040 118 4.731 0.042 121 5.071 0.041 126 5.203 - - - 0.041 126 5.203 A - - - 0.001 266 0.266 0.002 121 0.224 0.002 126 0.243 - - - 0.002 126 0.243 - - - 0.002 39 0.078 - - - - - - - - - - - - - - - - - 0.000 - - 0.000 - - - - - - - - - - - 0.000 - - - - - - - - - - - - - - - A - - - 0.003 50 0.150 - - - - - - - - - - - - A - - - - - 0.000 - - 0.000 - - - - - - - - - Subtotal: Uncategorized - - - - - 5.225 - - 5.295 - - 5.446 - - - - - 5.446 Total - - - - - 5.225 - - 5.295 - - 5.446 - - - - - 5.446 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: RATO procurement costs account for First Article Testing of new assets, transportation costs, inert motors for training, and travel costs LI 000074 - War Consumables Air Force UNCLASSIFIED Page 3 of 4 P-1 Line #85 Volume 1 - 223 === page 260 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000074 / War Consumables Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 4 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: Multi-Platform Electronic Warfare Equipment FY 2026 Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) Hardware Expendable Decoys A - - - 0.063 164 10.340 0.070 150 10.508 0.073 150 11.015 - - - 0.073 150 11.015 ALE-70 Towed Decoy A - - - 0.063 164 10.343 0.070 150 10.520 0.073 944 68.926 - - - 0.073 944 68.926 Subtotal: Hardware - - - - - 20.683 - - 21.028 - - 79.941 - - - - - 79.941 Total - - - - - 20.683 - - 21.028 - - 79.941 - - - - - 79.941 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: Advanced Expendable Counter Measures (AECM) includes the ALE-70 Towed Decoy and Expendable Decoys (ALQ-260 and other advanced expendable countermeasures) designed to fit into the F-35 Joint Strike Fighter (JSF) aircraft. Quantities are buy-to-budget for both ALE-70 and ALQ-260. Funding for both weapons systems is dispersed on an annual basis. LI 000074 - War Consumables Air Force UNCLASSIFIED Page 4 of 4 P-1 Line #85 Volume 1 - 224 === page 261 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities 000075 / Other Production Charges / BSA 5: Other Production Charges ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0207439F Line Item MDAP/MAIS Code: N/A Resource Summary Prior Years Procurement Quantity (Units in Each) Gross/Weapon System Cost ($ in Millions) Less PY Advance Procurement ($ in Millions) Net Procurement (P-1) ($ in Millions) Plus CY Advance Procurement ($ in Millions) Total Obligation Authority ($ in Millions) 0.000 0.000 0.000 FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total FY 2028 FY 2029 FY 2030 - - - - - - - - 1,559.926 1,559.926 1,559.926 1,462.290 1,462.290 1,462.290 2,528.401 - - 2,528.401 - 2,528.401 - - 2,528.401 - 2,528.401 - 2,528.401 2,482.120 2,482.120 2,482.120 2,533.431 2,533.431 2,533.431 2,472.641 2,472.641 2,472.641 To FY 2031 Complete 2,468.405 2,468.405 2,468.405 Total - 15,507.214 - 15,507.214 - 15,507.214 (The following Resource Summary rows are for informational purposes only. The corresponding budget requests are documented elsewhere.) Initial Spares ($ in Millions) - - - - - - - - - - - - Flyaway Unit Cost ($ in Millions) - - - - - - - - - - - - Gross/Weapon System Unit Cost ($ in Millions) - - - - - - - - - - - - Description: The Other Production Charges program provides for items which are not directly related to other procurement line items in this appropriation, cannot be reasonably allocated and charged to other procurement line items in this appropriation, can be managed as separate end items, may contain certain classified programs, and may be alternate mission equipment, not considered a modification, for out of production systems. The major efforts supported include funding for Electronic Attack pods and associated test equipment, B-2 Squadrons, F-15E Squadrons, Electronic Warfare (EW) Reprogramming Enterprise and the EW/Cyber Combat Assessment via COMBAT SHIELD for multiple combat airframes, F-15 Eagle Passive/Active Warning and Survivability System (EPAWSS), F-16 Squadrons, Combat Training Range Equipment, AN/ ARC-260 High Frequency Radio Depot activation efforts, Positioning, Navigation, and Timing (PNT) Key Data Loading Installation Facility (KLIF) efforts, T-7A (Advanced Pilot Training) Depot Activation, Aerial Targets, Maintenance Support Vehicles or Equipment and the required U.S. contribution for projects defined by the NATO Airborne Early Warning and Control (AEW&C) Board of Directors and approved by the U.S. government. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. The FY 2026 spend plan amount for Aircraft procurement includes 1,462,290 thousand of discretionary and 279,180 thousand of mandatory (reconciliation) for a total of 1,741,470 thousand. The program has associated Research Development Test and Evaluation funding in Program Elements (PEs) 0207591F, 0305116F, 0101127F, 0207429F, 0207439F, 0207171F, 0207134F, 0207133F, 0303133F, 0604201F, 1001012F and 0804701F. LI 000075 - Other Production Charges Air Force UNCLASSIFIED Page 1 of 18 P-1 Line #86 Volume 1 - 225 === page 262 === UNCLASSIFIED Date: April 2026 Exhibit P-40, Budget Line Item Justification: PB 2027 Air Force P-1 Line Item Number / Title: Appropriation / Budget Activity / Budget Sub Activity: 3010F: Aircraft Procurement, Air Force / BA 07: Aircraft Supt Equipment & Facilities 000075 / Other Production Charges / BSA 5: Other Production Charges ID Code (A=Service Ready, B=Not Service Ready): A Program Elements for Code B Items: N/A Other Related Program Elements: 0207439F Line Item MDAP/MAIS Code: N/A Exhibits Schedule Exhibit Type Title* Subexhibits ID CD MDAP/ MAIS Code Prior Years FY 2025 FY 2026 FY 2027 Base FY 2027 OOC FY 2027 Total Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) Quantity / Total Cost (Each) / ($ M) P-40a High Frequency Radio Systems - / - - / 0.000 - / 12.058 - / 12.929 - / - - / 12.929 P-40a B-2 Squadrons - / - - / 19.358 - / 19.625 - / 39.137 - / - - / 39.137 P-40a C-5 Airlift Squadrons (IF) - / - - / 0.000 - / 0.103 - / 0.174 - / - - P-40a Advanced Program Evaluation - / - / 2,098.803 - / - P-40a Combat Training Range Equipment - / - - / 38.843 - / 31.508 - / 28.295 - / - - P-40a Electromagnetic Warfare Int Reprog (EWIR) - / - - / 4.175 - / 4.233 - / 4.354 - / - - / 4.354 P-40a F-15 EPAWSS - / - - / 2.040 - / 41.770 - / 27.088 - / - - / 27.088 P-40a F-15E Squadrons - / - - / 12.876 - / 12.903 - / 101.264 - / - - / 101.264 P-40a F-15EX - / - - / 40.084 - / 0.000 - / 51.213 - / - - / 51.213 P-40a F-16 Squadrons - / - - / 0.000 - / 19.000 - / 19.416 - / - - / 19.416 P-40a F-22A Squadrons - / - - / 31.025 - / 0.000 - / 0.000 - / - - / 0.000 P-40a PNT Resiliency, Mods, and Improvements - / - - / 0.000 - / 0.000 - / 0.828 - / - - / 0.828 P-40a Service Support to NATO AEW&C Program - / - - / 60.045 - / 54.099 - / 47.815 - / - - / 47.815 P-40a Aerial Targets / - - / 18.377 - / 18.623 - / 19.145 - / - - / 19.145 P-40a T-7A (Advanced Pilot Training) Program - / 0.000 - / 13.279 - / 51.510 - / 77.940 - / - - P-40 Total Gross/Weapon System Cost - / 0.000 / 2,528.401 - / - - - - / 1,319.824 / 1,559.926 - - / 1,196.858 / 1,462.290 - - - - / 0.174 / 2,098.803 / 28.295 / 77.940 / 2,528.401 *Title represents 1) the Number / Title for Items; 2) the Number / Title [DODIC] for Ammunition; and/or 3) the Number / Title (Modification Type) for Modifications. Title represents the P-40a Title when only the P-40a Summary/Total is shown. Note: Totals in this Exhibit P-40 set may not be exact or sum exactly due to rounding. Justification: FY 2027 funding supports major efforts to include High Frequency Radio Systems, B-2 Squadrons, Advanced Program Evaluation, Combat Training Range Equipment, Electromagnetic Warfare Int Reprograming (EWIR) Enterprise, F-15 EPAWSS, F-15E Squadrons, F-15EX, F-16 AIFF Mode 5, Positioning, Navigation, and Timing (PNT) Key Data Loading Installation Facility (KLIF) efforts, Service Support to NATO AEW&C Program, Aerial Targets and T-7A (Advanced Pilot Training). Details are provided in the P-40a exhibits. Funding for this exhibit is contained in PEs 0305116F, 0101127F, 0401119F, 0207429F, 0207439F, 0207171F, 0207134F, 0207146F, 0207133F, 0207138F, 0303133F, 0604201F, 1001012F and 0804701F. LI 000075 - Other Production Charges Air Force UNCLASSIFIED Page 2 of 18 P-1 Line #86 Volume 1 - 226 === page 263 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000075 / Other Production Charges Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 5 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: High Frequency Radio Systems FY 2026 Total Cost Unit Cost ($ M) ($ M) FY 2027 Base Total Cost Qty (Each) Unit Cost ($ M) ($ M) FY 2027 OOC Total Cost Qty (Each) ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Total Cost Qty (Each) ($ M) Support Interim Contractor Support - Repairs and Services A Program Support Costs A - - - - - 0.000 - - 2.942 - - 3.620 - - - - - 3.620 - - - - - 0.000 - - 1.325 - - 2.317 - - - - - 2.317 - - - - - 0.000 - - 4.267 - - 5.937 - - - - - 5.937 - - - - - - - - - - - 1.542 - - - - - 1.542 - - - - - - - - - - - 0.953 - - - - - 0.953 - - - - - - - - - - - 0.434 - - - - - 0.434 - - - - - - - - - - - 1.127 - - - - - 1.127 - - - - - - - - - - - 4.056 - - - - - 4.056 - - - - - 0.000 3.895 7.791 2.936 2.936 - - - 2.936 Subtotal: Test Equipment - - - - - 0.000 - - 7.791 - - 2.936 - - - - - 2.936 Total - - - - - 0.000 - - 12.058 - - 12.929 - - - - - 12.929 Subtotal: Support Training and Tooling Repair Line Layout A Tooling/Software Licensing A Contractor Training Costs A Technical Data A Subtotal: Training and Tooling Test Equipment Hardware and Software Test Station Procurement A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. 2 1 1 2.936 Remarks: FY 2027 funding request supports organic depot activation efforts at Robins AFB for the High Frequency Radio Systems (HFRS) program for the AN/ARC-260 high Frequency (HF) airborne radio. The AN/ARC-260 program is in the final stages of development of the airborne radio for 15 different aircraft platforms and began depot activation efforts in FY 2026. FY 2027 depot activation efforts for the HFRS program include procurement of 1 hardware/software test station, 70% completion of the creation of technical data, procurement of tooling and software licenses, interim contractor support (ICS) for AN/ARC-260 repairs, modifications to the existing repair line and program support costs. Funding for this exhibit contained in PE 0303133F. LI 000075 - Other Production Charges Air Force UNCLASSIFIED Page 3 of 18 P-1 Line #86 Volume 1 - 227 === page 264 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000075 / Other Production Charges Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 5 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: B-2 Squadrons FY 2026 Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) Uncategorized B-2 PSC A - - - - - 1.778 - - 1.601 - - 1.957 - - - - - 1.957 B-2 STE A - - - - - 17.580 - - 18.024 - - 37.180 - - - - - 37.180 Subtotal: Uncategorized - - - - - 19.358 - - 19.625 - - 39.137 - - - - - 39.137 Total - - - - - 19.358 - - 19.625 - - 39.137 - - - - - 39.137 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: FY 2027 funding request for Depot activation to execute the transition schedule for B-2 Interim Contract Support (ICS) and maintain the depot repair capability as directed by HQ AFMC via the Source of Repair Assignment (SORA) process. Funding supports the Special Test Equipment (STE) program and addresses obsolescence issues which directly impact the B-2 combat capability. Funding for STE provides assessment of all ICS/CDM STE used in support of B-2 LRU/SRU repairs and recommendations for Modernization (upgrade, refurbishment, replacement, and/or redesign) prioritization necessary to ensure repair capability. Funding ensures improved STE availability and reliability while minimizing delayed delivery of LRUs/SRUs to the B-2 fleet. Program Support Costs (PSC): Efforts associated with services provided in support of program office management and administration processes to include but not limited to program oversight, resource justification, budget and programming, milestone and schedule tracking. Funding for this exhibit is contained in PE 0101127F. LI 000075 - Other Production Charges Air Force UNCLASSIFIED Page 4 of 18 P-1 Line #86 Volume 1 - 228 === page 265 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000075 / Other Production Charges Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 5 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: C-5 Airlift Squadrons (IF) FY 2026 Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) C-5 Airlift Squadrons (IF) - - - - - 0.000 - - 0.103 - - 0.174 - - - - - 0.174 Subtotal: C-5 Airlift Squadrons (IF) C-5 A - - - - - 0.000 - - 0.103 - - 0.174 - - - - - 0.174 Total - - - - - 0.000 - - 0.103 - - 0.174 - - - - - 0.174 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: FY 2027 C-5 funding to support organic Depot Activation efforts. LI 000075 - Other Production Charges Air Force UNCLASSIFIED Page 5 of 18 P-1 Line #86 Volume 1 - 229 === page 266 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000075 / Other Production Charges Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 5 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: Advanced Program Evaluation FY 2026 Total Cost ($ M) Unit Cost ($ M) FY 2027 Base Total Cost Qty (Each) ($ M) Unit Cost ($ M) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) Uncategorized - - - - - 1,319.824 - - 1,196.858 - - 2,098.803 - - - - - 2,098.803 Subtotal: Uncategorized Classified Programs A - - - - - 1,319.824 - - 1,196.858 - - 2,098.803 - - - - - 2,098.803 Total - - - - - 1,319.824 - - 1,196.858 - - 2,098.803 - - - - - 2,098.803 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: This program is reported in accordance with Title 10, United States Code, Section 119(a)(1) in the Special Access Program Annual Report to Congress. LI 000075 - Other Production Charges Air Force UNCLASSIFIED Page 6 of 18 P-1 Line #86 Volume 1 - 230 === page 267 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000075 / Other Production Charges Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 5 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: Combat Training Range Equipment FY 2026 Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Base Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 OOC Total Cost Unit Cost ($ M) ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) P6 Combat Training System P6CTS Participant Subsystem & PSES A P6CTS Spares - - - - - 13.942 - - 30.697 - - 27.852 - - - - - A - - - - Subtotal: P6 Combat Training System - - - - - 0.000 - - 13.942 - - - - - 30.697 - - - - - - 0.706 - - 0.495 - - - - - 0.797 - - - - - - - 1.503 - - - - - - 0.862 - - - - - - - - - - - - Subtotal: P5 Combat Training System - - Total - - 27.852 - - - - - - - - - 27.852 - - - - - 27.852 - - - - - - - - - - - - - - - - - - - - 0.495 - - - - - - - - - - - - - - 0.120 - - - - - 0.120 1.279 - - - - - - - - - - - - - 2.141 - - - - - 0.120 - - - - - 0.120 - - 21.257 - - 0.316 - - 0.323 - - - - - 0.323 - - - 21.257 - - 0.316 - - 0.323 - - - - - 0.323 - - - 38.843 - - 31.508 - - 28.295 - - - - - 28.295 P6 Program Support Cost P6 Program Support Cost Other Government Costs A P6 Program Support Cost Contractor Services A Subtotal: P6 Program Support Cost P5 Program Support Cost P5 Program Support Cost Other Government Costs A P5 Program Support Cost Contractor Services A Subtotal: P5 Program Support Cost P5 Combat Training System P5 Combat Training System Equipment Spares A Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: FY 2027 funding request supports existing critical training capability gaps and will enable comprehensive, realistic air combat training. Key upgrades include a trusted operating system, Multiple Independent Levels Security (MILS) architecture, Type 1 encryption of over-air data, and increased processing capability. P6 Combat Training System (CTS) investment will support a robust Air-to-Air and Air-to-Ground combat training environment and provide a growth path to Blended Training capability. FY 2027 funding request includes but is not limited to the procurement of P6CTS Pods, site surveys, installations, training, Interim Contractor Support (ICS) to include Field Representative support and program office contractor support to manage procurement activities. Funding request includes but not limited to the purchase of P6CTS Participant Subsystems (PS) and associated spares and support equipment. Spares consist of replacement parts, components and/or major subassemblies that make up the PS. Production/Spares procurement will continue to various bases in the out years. Funds will support CTS Program Support Costs to include direct, unique program costs (other than payroll costs for government personnel) required for the operation of a program office in its management and oversight role. CTS provides instrumentation required to train aircrews in air-to-air, air-to-ground, and ground-to-air combat under simulated combat conditions in any available airspace worldwide. The P5 CTS is comprised of the P5 pod, communication links, and a ground station to support range safety, training execution, and aircrew debriefings. The system has an estimated lifecycle through 2034. CTS Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. CTS funds may be used but are not limited to addressing product obsolescence issues through studies, bridge buys, life of type buys, supplier parts replacement and qualification activities to preserve future production capabilities and capacities. LI 000075 - Other Production Charges Air Force UNCLASSIFIED Page 7 of 18 P-1 Line #86 Volume 1 - 231 === page 268 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 5 Funding for this exhibit is contained in PE 0207429F. LI 000075 - Other Production Charges Air Force P-1 Line Item Number / Title: 000075 / Other Production Charges UNCLASSIFIED Page 8 of 18 Aggregated Items Title: Combat Training Range Equipment P-1 Line #86 Volume 1 - 232 === page 269 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000075 / Other Production Charges Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 5 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: Electromagnetic Warfare Int Reprog (EWIR) FY 2026 Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) EWIR Electromagnetic Warfare Integrated Reprogramming (EWIR) A - - - - - 4.175 - - 4.233 - - 4.354 - - - - - 4.354 Subtotal: EWIR - - - - - 4.175 - - 4.233 - - 4.354 - - - - - 4.354 Total - - - - - 4.175 - - 4.233 - - 4.354 - - - - - 4.354 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: The Electronic Warfare Avionics Integration Support Facility (EWAISF) has the Operational, Safety, Suitability, and Effectiveness (OSS&E) responsibility for USAF and Foreign Military Sales (FMS) Avionics and EW Systems. It is also the sustainment reprogramming center (RC) for the EWIR process charged with the following: Test/Check EW System Operational Flight Programs (OFPs), supporting MAJCOM mission data RC with reprogramming tools, and total EW system testing to ensure mission capability by replicating the Electromagnetic Spectrum (EMS) environment for Hardware-in-the-loop (HITL) laboratory testing. This testing validates previous open-air test & evaluation of modified EW systems via internal test, evaluation, assessment, and characterization capability representing current and emerging adversary systems to include network centric capabilities. Funding for this exhibit is contained in PE 0207439F Electromagnetic Warfare Integrated Reprogramming (EWIR) LI 000075 - Other Production Charges Air Force UNCLASSIFIED Page 9 of 18 P-1 Line #86 Volume 1 - 233 === page 270 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000075 / Other Production Charges Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 5 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: F-15 EPAWSS FY 2026 Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) F-15 EPAWSS - - - - - 2.040 - - 41.770 - - 27.088 - - - - - 27.088 Subtotal: F-15 EPAWSS F-15 EPAWSS A - - - - - 2.040 - - 41.770 - - 27.088 - - - - - 27.088 Total - - - - - 2.040 - - 41.770 - - 27.088 - - - - - 27.088 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: FY 2027 funding supports establishment of organic repair depot capability to include repair/install tooling, material lay-in, repair test assets, software training, technical requirement documents (TRDs) and test program sets (TPSs) per Title 10 USC Section 2464, Core Logistics Capabilities and Title 10 USC Section 2466. Title 10 USC, Sections 2464 and 2466 mandate standup of an organic USG depot maintenance/repair capability No Later Than (NLT) Initial Operating Capability (IOC) + 4 years. Funding for this exhibit is contained in PE 0207171F. LI 000075 - Other Production Charges Air Force UNCLASSIFIED Page 10 of 18 P-1 Line #86 Volume 1 - 234 === page 271 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000075 / Other Production Charges Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 5 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: F-15E Squadrons FY 2026 Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) Uncategorized - - - - - 12.876 - - 12.903 - - 101.264 - - - - - 101.264 Subtotal: Uncategorized APG-82(V)1 A - - - - - 12.876 - - 12.903 - - 101.264 - - - - - 101.264 Total - - - - - 12.876 - - 12.903 - - 101.264 - - - - - 101.264 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: FY 2027 funding supports other production charges for F-15E squadrons to include but not limited to F-15E Radar Modernization Program (RMP) (designated the APG-82(V)1) which replaces 217 legacy F-15E radars with an active electronically scanned array radar using existing technology from other DOD platforms. Funding also provides for parts obsolescence issues to improve reliability and performance which includes both air-to-air and air-to-ground modes. Funding for this exhibit is contained in PE 0207134F. LI 000075 - Other Production Charges Air Force UNCLASSIFIED Page 11 of 18 P-1 Line #86 Volume 1 - 235 === page 272 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000075 / Other Production Charges Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 5 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: F-15EX FY 2026 Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) Depot Activation F-15EX Depot Activation A - - - - - 40.084 - - 0.000 - - 51.213 - - - - - 51.213 Subtotal: Depot Activation - - - - - 40.084 - - 0.000 - - 51.213 - - - - - 51.213 Total - - - - - 40.084 - - 0.000 - - 51.213 - - - - - 51.213 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: FY 2027 funding provides for other production charges to include organic, depot-level repair capabilities for F-15EX aircraft components to ensure continued operational flexibility, enabling it to perform a wide range of mission sets with one or two aircrew. Funding for this exhibit is contained in PE 0207146F. Other Production Charges are for items which are not directly related to other procurement line items in this appropriation, cannot be reasonably allocated and charged to other procurement line items in this appropriation, can be managed as separate end items, may contain certain classified programs, and may be alternate mission equipment, not considered a modification, for out of production systems. The FY2025 funding supported continuing activation of organic, depot-level repair capabilities for aircraft components that are installed and support the F-15EX ("depot-level repairables). The FY2027 funding will support continuing activation of organic, depot-level repair capabilities for aircraft components that are installed and support the F-15EX ("depot-level repairables). The FY 2026 spend plan amount for F-15EX 3010 BP19 includes 0 thousand of discretionary and 18,181 thousand of mandatory (reconciliation) for a total of 18,181 thousand. Funding for Depot Activation was based on the status of the following Depot Source of Repair (DSOR) approvals for the organic depots: Environmental Control (Complete, 24 Sep 21), Hydraulic Components (Complete, 24 Sep 21), Avionic Components (Complete, 14 Jul 22), Engine/Powerplant (Complete, 17 Nov 22), and Airframe (Completed, 3 Mar 23). LI 000075 - Other Production Charges Air Force UNCLASSIFIED Page 12 of 18 P-1 Line #86 Volume 1 - 236 === page 273 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000075 / Other Production Charges Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 5 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: F-16 Squadrons FY 2026 Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) Uncategorized - - - - - 0.000 - - 19.000 - - 19.416 - - - - - 19.416 Subtotal: Uncategorized F-16 AIFF Mode 5 A - - - - - 0.000 - - 19.000 - - 19.416 - - - - - 19.416 Total - - - - - 0.000 - - 19.000 - - 19.416 - - - - - 19.416 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: The APX-127(V)1 Advanced Identify Friend/Foe (AIFF) system provides interrogator and transponder functions for designated F-16 aircraft. AIFF interrogation is used in support of Beyond Visual Range weapons delivery by providing the pilot with situational awareness. When an F-16 pilot interrogates aircraft, the AIFF system looks forward for friendly targets, reports these targets to the F-16 mission computer, and subsequently displays the identified target on a multi-function display. The AIFF transponder function ensures air traffic control and other interrogators can reliably ascertain identity and altitude information from the F-16. Transponder modes and codes can be entered manually via upfront controls, or they can change automatically with time or aircraft position. A backup control panel enables backup operation of Mode 5 transponder replies as well as emergency operation, standby operation, and ON/OFF control. Per Joint Depot Source of Repair (DSOR) Decision #22021F, Warner Robins Air Logistics Center (WR-ALC) is the designated Center of Industrial and Technical Excellence and is assigned as the Technology Repair Center for the F-16 AIFF APX-127(V). The 402d Electronics Maintenance Group (EMXG) maintains core capabilities and processes in depot-level test, maintenance, repair, modification, manufacturing, certification, declassification, and engineering support to weapon systems and associated support equipment. The APX-127(V)1 will replace the APX-125, and existing manpower, resources, and supply chain requirements will be leveraged during depot activation. The 402 EMXG provides secure/ environmentally controlled space, clean room space, screen/shielded room operations, and electrical and environmental testing. Capacity exists to accommodate this workload. The original equipment manufacturer has a corporate contract and working relationship with WR-ALC and sent a team to WR-ALC to train personnel on system repair procedures. Depot Stand Up began in FY2026. Depot activation costs include gap analysis studies, engineering services, technical data, Interface Test Adapters (ITA), Power Amplifier/Input Output (PA/IO), and IFF test racks. Funding for this exhibit contain in PE 0207133F. LI 000075 - Other Production Charges Air Force UNCLASSIFIED Page 13 of 18 P-1 Line #86 Volume 1 - 237 === page 274 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000075 / Other Production Charges Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 5 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: F-22A Squadrons FY 2026 Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) Uncategorized - - - - - 31.025 - - 0.000 - - 0.000 - - - - - 0.000 Subtotal: Uncategorized F-22 A Squadrons A - - - - - 31.025 - - 0.000 - - 0.000 - - - - - 0.000 Total - - - - - 31.025 - - 0.000 - - 0.000 - - - - - 0.000 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: No FY 2027 funding requested. LI 000075 - Other Production Charges Air Force UNCLASSIFIED Page 14 of 18 P-1 Line #86 Volume 1 - 238 === page 275 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000075 / Other Production Charges Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 5 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: PNT Resiliency, Mods, and Improvements FY 2026 Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) KEY DATA LOADING INSTALLATION FACILITY KEY DATA LOADING INSTALLATION FACILITY A - - - - - 0.000 - - 0.000 - - 0.828 - - - - - 0.828 Subtotal: KEY DATA LOADING INSTALLATION FACILITY - - - - - 0.000 - - 0.000 - - 0.828 - - - - - 0.828 Total - - - - - 0.000 - - 0.000 - - 0.828 - - - - - 0.828 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: This program transferred from the USSF beginning in FY 2027 as directed in the "M-Code Aviation Receiver Enterprise Acquisition Decision Memorandum", dated 25 Nov 2024 and signed by Mr. William A. LaPlante, Under Secretary of Defense for Acquisition and Sustainment (USD(A&S)). KEY DATA LOADING INSTALLATION FACILITY (KLIF)/GPS SECURITY DEVICE: The KLIF facilitates the programming of black key (cryptographic) algorithms into the Selective Availability Anti-Spoofing Module (SAASM) to provide accurate positioning solutions for GPS users using secure equipment. Similar work for the Military GPS User Equipment (MGUE) is in the planning phase. FY2027 funding provides for the programming of black key (cryptographic) Algorithms and Initialization Parameters into the SAASM, providing an accurate positioning solution for GPS users using security equipment. Funding will procure support for SAASM Key Data Processors (KDP) based User Equipment programming, ensuring uninterrupted support to SAASM developers. SAASM developers are required to integrate the government-provided KDP as part of the SAASM security architecture of GPS User Equipment. Funding for this exhibit is contained in 0604201F. Through the end of FY2026, Key Data Loading Installation Facility efforts will be executed in 3022 BA 01 Space Procurement / BSA 10 Space Programs / GPSSPC Global Positioning (Space) / PE 1203164SF NAVSTAR Global Positioning System (User Equipment) LI 000075 - Other Production Charges Air Force UNCLASSIFIED Page 15 of 18 P-1 Line #86 Volume 1 - 239 === page 276 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000075 / Other Production Charges Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 5 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: Service Support to NATO AEW&C Program FY 2026 Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) Uncategorized NATO AWACSModernization Projects A - - - - - 60.045 - - 54.099 - - 47.815 - - - - - 47.815 Subtotal: Uncategorized - - - - - 60.045 - - 54.099 - - 47.815 - - - - - 47.815 Total - - - - - 60.045 - - 54.099 - - 47.815 - - - - - 47.815 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: FY 2027 funding request to support NATO E-3 aircraft which provides air and maritime surveillance and air control for allied forces in the NATO area of operations. The required U.S. funding for projects is defined by the NATO Airborne Early Warning and Control (NAEWC) Board of Directors and approved by the U.S. government. Funding supports projects that include but are not limited to the Follow-on Upgrade Program (FUP I), Final Lifetime Extension Program (FLEP) modernization projects, and planning/analysis for NATO's next replacement program. The FUP I satisfies international airspace mandates for upgraded Communications Navigation Surveillance/Air Traffic Management (CNS/ATM) as well as transponder upgrades for Mode 5 and Enhanced Mode S and includes planning activities for a FUP II effort. The FLEP efforts include but are not limited to projects that will enable the aircraft to maintain airspace access, ensure continued interoperability with the USAF AWACS/E-7/Advanced Battle Management System (ABMS), meet emerging military requirements, and sustain the NATO fleet for the future needs of NATO to at least 2035. Funding for this exhibit is contained in PE 1001012F. LI 000075 - Other Production Charges Air Force UNCLASSIFIED Page 16 of 18 P-1 Line #86 Volume 1 - 240 === page 277 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000075 / Other Production Charges Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 5 Prior Years MDAP/ Item Number / Title [DODIC] ID CD MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost Unit Cost ($ M) ($ M) Qty (Each) Aggregated Items Title: Aerial Targets FY 2026 Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) Uncategorized - - - - - 18.377 - - 18.623 - - 19.145 - - - - - 19.145 Subtotal: Uncategorized Aerial Targets A - - - - - 18.377 - - 18.623 - - 19.145 - - - - - 19.145 Total - - - - - 18.377 - - 18.623 - - 19.145 - - - - - 19.145 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: FY 2027 funding procures ALQ-167 and/or DLQ-9 electronic attack pods for target drones including support equipment. Payloads emulate threat aircraft electronic countermeasures and jamming capabilities in support of lethality testing and associated hardware procurement due to kill authorizations. Funding may be used to address Diminishing Manufacturing Sources (DMS) issues. Funding for this exhibit is contained in PE 0305116F. LI 000075 - Other Production Charges Air Force UNCLASSIFIED Page 17 of 18 P-1 Line #86 Volume 1 - 241 === page 278 === UNCLASSIFIED Date: April 2026 Exhibit P-40a, Budget Item Justification For Aggregated Items: PB 2027 Air Force P-1 Line Item Number / Title: 000075 / Other Production Charges Appropriation / Budget Activity / Budget Sub Activity: 3010F / 07 / 5 Prior Years MDAP/ Item Number / Title [DODIC] ID CD Advanced Pilot Trainer Depot Activation A MAIS Code Unit Cost ($ M) Qty (Each) FY 2025 Total Cost ($ M) Unit Cost ($ M) Qty (Each) Aggregated Items Title: T-7A (Advanced Pilot Training) Program FY 2026 Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Base Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 OOC Total Cost ($ M) Unit Cost ($ M) Qty (Each) FY 2027 Total Total Cost Unit Cost ($ M) ($ M) Qty (Each) Total Cost ($ M) APT - - 0.000 - - 13.279 - - 51.510 - - 77.940 - - - - - 77.940 Subtotal: APT - - 0.000 - - 13.279 - - 51.510 - - 77.940 - - - - - 77.940 Total - - 0.000 - - 13.279 - - 51.510 - - 77.940 - - - - - 77.940 Note: Subtotals or Totals in this Exhibit P-40a may not be exact or sum exactly, due to rounding. Remarks: FY 2027 funding provides for depot activations supporting the T-7A's core determination and T-7A's Depot Source of Repair (DSOR) determination at the three Air Logistics Complexes (ALCs). This funding enables initial activation of depot repair capabilities (i.e., tools and equipment, facility modification, and training) for T-7A aircraft, as well as engine components, sub-assemblies, structures, and software. Funding for this exhibit is contained in PE 0804701F. LI 000075 - Other Production Charges Air Force UNCLASSIFIED Page 18 of 18 P-1 Line #86 Volume 1 - 242